Sample records for generating units operated

  1. 77 FR 40647 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ... operation of the shared unit's diesel generator (emergency power) and to assure long term operation of the... actuation system limiting safety system settings, and emergency diesel generator surveillance start voltage... specification for the Vogtle Electric Generating Plant, Units 1 and 2, associated with the ``Steam Generator (SG...

  2. Testing to Characterize the Advanced Stirling Radioisotope Generator Engineering Unit

    NASA Technical Reports Server (NTRS)

    Lewandowski, Edward; Schreiber, Jeffrey

    2010-01-01

    The Advanced Stirling Radioisotope Generator (ASRG), a high efficiency generator, is being considered for space missions. Lockheed Martin designed and fabricated an engineering unit (EU), the ASRG EU, under contract to the Department of Energy. This unit is currently undergoing extended operation testing at the NASA Glenn Research Center to generate performance data and validate life and reliability predictions for the generator and the Stirling convertors. It has also undergone performance tests to characterize generator operation while varying control parameters and system inputs. This paper summarizes and explains test results in the context of designing operating strategies for the generator during a space mission and notes expected differences between the EU performance and future generators.

  3. 40 CFR 69.11 - New exemptions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... not be operated until a final PSD permit is issued for that unit; (ii) Each electric generating unit shall not be operated until that unit complies with all requirements of its PSD permit, including, if...

  4. 40 CFR 69.11 - New exemptions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... not be operated until a final PSD permit is issued for that unit; (ii) Each electric generating unit shall not be operated until that unit complies with all requirements of its PSD permit, including, if...

  5. 40 CFR 69.11 - New exemptions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... not be operated until a final PSD permit is issued for that unit; (ii) Each electric generating unit shall not be operated until that unit complies with all requirements of its PSD permit, including, if...

  6. 78 FR 50455 - Vogtle Electric Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Changes to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-19

    ... Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Changes to the Chemical Volume Control System AGENCY: Nuclear Regulatory Commission. ACTION: Exemption and combined license amendment; issuance... Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, Municipal...

  7. 76 FR 388 - Southern Nuclear Operating Company; Vogtle Electric Generating Plant, Unit Nos. 1 and 2; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-04

    ... Design,'' GDC 31, ``Fracture Prevention of Reactor Coolant Pressure Boundary,'' and GDC 32, ``Inspection... Operating Company; Vogtle Electric Generating Plant, Unit Nos. 1 and 2; Notice of Consideration of Issuance of Amendment to Facility Operating License, Proposed No Significant Hazards Consideration...

  8. Modeling of unit operating considerations in generating-capacity reliability evaluation. Volume 1. Mathematical models, computing methods, and results. Final report. [GENESIS, OPCON and OPPLAN

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patton, A.D.; Ayoub, A.K.; Singh, C.

    1982-07-01

    Existing methods for generating capacity reliability evaluation do not explicitly recognize a number of operating considerations which may have important effects in system reliability performance. Thus, current methods may yield estimates of system reliability which differ appreciably from actual observed reliability. Further, current methods offer no means of accurately studying or evaluating alternatives which may differ in one or more operating considerations. Operating considerations which are considered to be important in generating capacity reliability evaluation include: unit duty cycles as influenced by load cycle shape, reliability performance of other units, unit commitment policy, and operating reserve policy; unit start-up failuresmore » distinct from unit running failures; unit start-up times; and unit outage postponability and the management of postponable outages. A detailed Monte Carlo simulation computer model called GENESIS and two analytical models called OPCON and OPPLAN have been developed which are capable of incorporating the effects of many operating considerations including those noted above. These computer models have been used to study a variety of actual and synthetic systems and are available from EPRI. The new models are shown to produce system reliability indices which differ appreciably from index values computed using traditional models which do not recognize operating considerations.« less

  9. Study on safety operation for large hydroelectric generator unit

    NASA Astrophysics Data System (ADS)

    Yan, Z. G.; Cui, T.; Zhou, L. J.; Zhi, F. L.; Wang, Z. W.

    2012-11-01

    Hydroelectric generator unit is a complex mechanical system which is composed of hydraulic turbine and electric generator. Rotary system is supported by the bearing bracket and the reinforced concrete structures, and vibration problem can't be avoided in the process of operating. Many large-scale hydroelectric units have been damaged because of the vibration problem in recent years. As the increase of the hydraulic turbine unit capacity and water head, the safe operation of hydraulic turbine has become a focus research in many countries. The operating characteristics of the hydraulic turbine have obvious differences at different working conditions. Based on the combination of field measurement and theoretical calculation, this paper shows a deep research on the safe operation of a large-scale Francis turbine unit. Firstly, the measurements of vibration, swing, pressure fluctuation and noise were carried out at 4 different heads. And also the relationships between vibrations and pressure fluctuations at different heads and working conditions were analysed deeply. Then the scientific prediction of safe operation for the unit at high head were done based on the CFD numerical calculation. Finally, this paper shows the division of the operating zone for the hydroelectric unit. According to the experimental results (vibrations, swings, pressure fluctuations and noise) as well as the theoretical results, the operating zone of the unit has been divided into three sections: prohibited operating zone, transition operating zone and safe operating zone. After this research was applied in the hydropower station, the security and economic efficiency of unit increased greatly, and enormous economic benefits and social benefits have been obtained.

  10. 78 FR 48155 - Rock River Beach, Inc.; Notice of Application Accepted for Filing With the Commission; Intent To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-07

    ... wood-framed powerhouse housing a 3-kilowatt (kW) generating unit run by a water wheel and a 5-kW generating unit run by a 24-inch vertical-shaft propeller turbine for a total installed capacity of 8 kW; and... Edison generator that operates via the water wheel and is operated once a year. The applicant operates...

  11. Installation, Operation, and Operator's Maintenance of Diesel-Engine-Driven Generator Sets.

    ERIC Educational Resources Information Center

    Marine Corps Inst., Washington, DC.

    This student guide, one of a series of correspondence training courses designed to improve the job performance of members of the Marine Corps, contains three study units dealing with the skills needed by individuals responsible for the installation, operation, and maintenance of diesel engine-driven generator sets. The first two units cover…

  12. Inventory of Electric Utility Power Plants in the United States

    EIA Publications

    2002-01-01

    Final issue of this report. Provides detailed statistics on existing generating units operated by electric utilities as of December 31, 2000, and certain summary statistics about new generators planned for operation by electric utilities during the next 5 years.

  13. Inventory of Nonutility Electric Power Plants in the United States

    EIA Publications

    2003-01-01

    Final issue of this report. Provides annual aggregate statistics on generating units operated by nonutilities in the United States and the District of Columbia. Provides a 5-year outlook for generating unit additions and changes.

  14. 78 FR 52987 - Entergy Nuclear Operations, Inc., Indian Point Nuclear Generating Unit 3

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-27

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-286; NRC-2013-0063] Entergy Nuclear Operations, Inc., Indian Point Nuclear Generating Unit 3 AGENCY: Nuclear Regulatory Commission. ACTION: Environmental assessment and finding of no significant impact; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission...

  15. Effect of accuracy of wind power prediction on power system operator

    NASA Technical Reports Server (NTRS)

    Schlueter, R. A.; Sigari, G.; Costi, T.

    1985-01-01

    This research project proposed a modified unit commitment that schedules connection and disconnection of generating units in response to load. A modified generation control is also proposed that controls steam units under automatic generation control, fast responding diesels, gas turbines and hydro units under a feedforward control, and wind turbine array output under a closed loop array control. This modified generation control and unit commitment require prediction of trend wind power variation one hour ahead and the prediction of error in this trend wind power prediction one half hour ahead. An improved meter for predicting trend wind speed variation is developed. Methods for accurately simulating the wind array power from a limited number of wind speed prediction records was developed. Finally, two methods for predicting the error in the trend wind power prediction were developed. This research provides a foundation for testing and evaluating the modified unit commitment and generation control that was developed to maintain operating reliability at a greatly reduced overall production cost for utilities with wind generation capacity.

  16. 77 FR 40091 - Entergy Nuclear Operations, Inc.; Indian Point Nuclear Generating, Units 2 and 3

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-06

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-247 and 50-286; NRC-2008-0672] Entergy Nuclear Operations, Inc.; Indian Point Nuclear Generating, Units 2 and 3 AGENCY: Nuclear Regulatory Commission... renewal of nuclear plants; availability. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the...

  17. 78 FR 26662 - Entergy Nuclear Operations, Inc., Indian Point Nuclear Generating Unit No. 3 Extension of Public...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-07

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-286; NRC-2013-0063] Entergy Nuclear Operations, Inc., Indian Point Nuclear Generating Unit No. 3 Extension of Public Comment Period AGENCY: Nuclear Regulatory... FURTHER INFORMATION CONTACT: Douglas V. Pickett, Senior Project Manager, Office of Nuclear Reactor...

  18. Inventory of Power Plants in the United States, October 1992

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Inventory of Power Plants in the United States is prepared annually by the Survey Management Division, Office of Coal, Nuclear, Electric and Alternate Fuels, Energy Information Administration (EIA), US Department of Energy (DOE). The purpose of this publication is to provide year-end statistics about electric generating units operated by electric utilities in the United States (the 50 States and the District of Columbia). The publication also provides a 10-year outlook of future generating unit additions. Data summarized in this report are useful to a wide audience including Congress, Federal and State agencies, the electric utility industry, and the generalmore » public. Data presented in this report were assembled and published by the EIA to fulfill its data collection and dissemination responsibilities as specified in the Federal Energy Administration Act of 1974 (Public Law 93-275) as amended. The report is organized into the following chapters: Year in Review, Operable Electric Generating Units, and Projected Electric Generating Unit Additions. Statistics presented in these chapters reflect the status of electric generating units as of December 31, 1992.« less

  19. Testing of the Advanced Stirling Radioisotope Generator Engineering Unit at NASA Glenn Research Center

    NASA Technical Reports Server (NTRS)

    Lewandowski, Edward J.

    2013-01-01

    The Advanced Stirling Radioisotope Generator (ASRG) is a high-efficiency generator being developed for potential use on a Discovery 12 space mission. Lockheed Martin designed and fabricated the ASRG Engineering Unit (EU) under contract to the Department of Energy. This unit was delivered to NASA Glenn Research Center in 2008 and has been undergoing extended operation testing to generate long-term performance data for an integrated system. It has also been used for tests to characterize generator operation while varying control parameters and system inputs, both when controlled with an alternating current (AC) bus and with a digital controller. The ASRG EU currently has over 27,000 hours of operation. This paper summarizes all of the tests that have been conducted on the ASRG EU over the past 3 years and provides an overview of the test results and what was learned.

  20. 78 FR 39018 - Entergy Nuclear Operations, Inc.; Indian Point Nuclear Generating Unit Nos. 2 and 3

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-28

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-247 and 50-286; NRC-2008-0672] Entergy Nuclear Operations, Inc.; Indian Point Nuclear Generating Unit Nos. 2 and 3 AGENCY: Nuclear Regulatory Commission... Renewal of Nuclear Plants; issuance. SUMMARY: Notice is hereby given that the U.S. Nuclear Regulatory...

  1. Thermoelectric Power Generation Utilizing the Waste Heat from a Biomass Boiler

    NASA Astrophysics Data System (ADS)

    Brazdil, Marian; Pospisil, Jiri

    2013-07-01

    The objective of the presented work is to test the possibility of using thermoelectric power to convert flue gas waste heat from a small-scale domestic pellet boiler, and to assess the influence of a thermoelectric generator on its function. A prototype of the generator, able to be connected to an existing device, was designed, constructed, and tested. The performance of the generator as well as the impact of the generator on the operation of the boiler was investigated under various operating conditions. The boiler gained auxiliary power and could become a combined heat and power unit allowing self-sufficient operation. The created unit represents an independent source of electricity with effective use of fuel.

  2. Use of mock-up training to reduce personnel exposure at the North Anna Unit 1 Steam Generator Replacement Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Henry, H.G.; Reilly, B.P.

    1995-03-01

    The North Anna Power Station is located on the southern shore of Lake Anna in Louisa County, approximately forty miles northwest of Richmond, Virginia. The two 910 Mw nuclear units located on this site are owned by Virginia Electric and Power Company (Virginia Power) and Old Dominion Electric Cooperative and operated by Virginia Power. Fuel was loaded into Unit 1 in December 1977, and it began commercial operation in June 1978. Fuel was loaded into Unit 2 in April 1980 and began commercial operation in December 1980. Each nuclear unit includes a three-coolant-loop pressurized light water reactor nuclear steam supplymore » system that was furnished by Westinghouse Electric Corporation. Included within each system were three Westinghouse Model 51 steam generators with alloy 600, mill-annealed tubing material. Over the years of operation of Unit 1, various corrosion-related phenomena had occurred that affected the steam generators tubing and degraded their ability to fulfill their heat transfer function. Advanced inspection and repair techniques helped extend the useful life of the steam generators, but projections based on the results of the inspections indicated that the existing steam generators tubing and degraded their ability to fullfill their heat transfer function. Advanced inspection and repair techniques helped extend the useful life of the steam generators, but projections based on the results of the inspections indicated that the existing steam generators would not last their design life and must be repaired. To this end Virginia Power determined that a steam generator replacement (SGR) program was necessary to remove the old steam generator tube bundles and lower shell sections, including the channel heads (collectively called the lower assemblies), and replace them with new lower assemblies incorporating design features that will prevent the degradation problems that the old steam generators had experienced.« less

  3. 78 FR 38970 - California State Nonroad Engine Pollution Control Standards; Within-the-Scope Determination for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-28

    ... Control Measure for In-Use Diesel-Fueled Transport Refrigeration Units (TRU) and TRU Generator Sets and... Control Measure for In-Use Diesel-Fueled Transport Refrigeration Units (TRU) and TRU Generator Sets and...-Fueled Transport Refrigeration Units (TRU) and TRU Generator Sets and Facilities Where TRUs Operate Be...

  4. Experience with 850-MW fossil-fired units in peaking service

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dixon, B.G.

    1978-01-01

    Experience with the peaking operation of two 850-MW gross generation units at the Martins Creek Steam Electric Station in Pennsylvania is described. The design, operation, and performance of these oil-fueled units are discussed. (LCL)

  5. 40 CFR 63.1101 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... operation. A unit operation may have more than one batch emission episode per batch cycle. For example, a... shutdowns and during periods not associated with a shutdown. Examples of activities that can generate... management units such as an air flotation unit, clarifier, or biological treatment unit. Examples of an oil...

  6. 40 CFR 63.1101 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... operation. A unit operation may have more than one batch emission episode per batch cycle. For example, a... shutdowns and during periods not associated with a shutdown. Examples of activities that can generate... management units such as an air flotation unit, clarifier, or biological treatment unit. Examples of an oil...

  7. 40 CFR 63.1101 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... operation. A unit operation may have more than one batch emission episode per batch cycle. For example, a... shutdowns and during periods not associated with a shutdown. Examples of activities that can generate... management units such as an air flotation unit, clarifier, or biological treatment unit. Examples of an oil...

  8. 40 CFR 63.1101 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operation. A unit operation may have more than one batch emission episode per batch cycle. For example, a... shutdowns and during periods not associated with a shutdown. Examples of activities that can generate... management units such as an air flotation unit, clarifier, or biological treatment unit. Examples of an oil...

  9. 40 CFR 63.1101 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... operation. A unit operation may have more than one batch emission episode per batch cycle. For example, a... shutdowns and during periods not associated with a shutdown. Examples of activities that can generate... management units such as an air flotation unit, clarifier, or biological treatment unit. Examples of an oil...

  10. Wood River recovery project -- speed and cooperation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Franczak, D.F.; Santschi, M.F.; Sander, S.

    1998-12-31

    A unit trip is a situation avoided by power generators because it affects their bottom line. The ability to recover from the trip quickly, and restore MW generation is the desired goal. However, what do you do if you lose your unit to a disastrous fire? How do you recover from this situation? This will be the subject of this paper describing such an event which affected the Illinois Power Company`s (IPC) operation. IPC`s Wood River Power Station suffered a disastrous fire which knocked out the Station`s only two operable units--4 and 5. The fire was the result of amore » coal mill explosion and damaged beyond repair, the units control systems and operating capabilities. A total of 488 MW in generating capacity was lost at a time when the IPC system required all available generation now, and in the foreseeable future. This paper will describe the event, the immediate mobilization efforts, and the challenges of recovering both units in the most expedient time frame possible. The keys to the success of the recovery project will be described in detail.« less

  11. 78 FR 45989 - Vogtle Electric Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Change to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Change to the Primary Sampling System.... The amendment requests to modify the Primary Sampling System (PSS) design, including changes to Tier 1....13-1 ``Primary Sampling System,'' and Subsection 2.3.13, ``Primary Sampling System'' of the Updated...

  12. 78 FR 45987 - Vogtle Electric Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Change to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Change to the Primary Sampling System.... The amendment requests to modify the Primary Sampling System (PSS) design, including changes to Tier 1....13-1 ``Primary Sampling System,'' and Subsection 2.3.13, ``Primary Sampling System'' of the Updated...

  13. 78 FR 79709 - Duke Energy Florida, Inc., Crystal River Unit 3 Nuclear Generating Plant Post-Shutdown...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-31

    ...., Crystal River Unit 3 Nuclear Generating Plant Post-Shutdown Decommissioning Activities Report AGENCY...) Accession No. ML13340A009), for the Crystal River Unit 3 Nuclear Generating Plant (CR-3). The PSDAR provides.... until 9 p.m., EST, at the Crystal River Nuclear Plant Training Center/Emergency Operations Facility...

  14. Recent Stirling Conversion Technology Developments and Operational Measurements

    NASA Technical Reports Server (NTRS)

    Oriti, Salvatore; Schifer, Nicholas

    2009-01-01

    Under contract to the Department of Energy (DOE), Lockheed Martin Space Systems Company (LMSSC) has been developing the Advanced Stirling Radioisotope Generator (ASRG). The use of Stirling technology introduces a four-fold increase in conversion efficiency over Radioisotope Thermoelectric Generators (RTGs), and thus the ASRG in an attractive power system option for future science missions. In August of 2008, the ASRG engineering unit (EU) was delivered to NASA Glenn Research Center (GRC). The engineering unit design resembles that of a flight unit, with the exception of electrical heating in place of a radioisotope source. Prior to delivery, GRC personnel prepared a test station continuous, unattended operation of the engineering unit. This test station is capable of autonomously monitoring the unit's safe operation and recording. , .. , .... performance data. Generator parameters recorded include temperatures, electrical power output, and thelmal power input. Convertor specific parameters are also recorded such as alternator voltage, current, piston amplitude, and frequency. Since November 2008, the ASRG EU has accumulated over 4,000 hours of operation. Initial operation was conducted using the AC bus control method in lieu of the LMSSC active power factor connecting controller. Operation on the LMSSC controller began in February 2009. This paper discusses the entirety of ASRG EU operation thus far, as well as baseline performance data at GRC and LMSSC, and comparison of performance using each control method.

  15. Tdp studies and tests for C. A. Energia Electrica de Venezuela (enelven) at planta ramon laguna, units RL-17 and RL-10. Volume 3. Unit RL-10 turbine generator condition assessment report and units RL-10 and RL-11 boiler feed pump conditon assessment report. Export trade information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-03-28

    The study, conducted by Babcock and Wilcox, was funded by the U.S. Trade and Development agency on behalf of Enelven. In order to maximize generated power output and minimize operating costs at Planta Ramon Laguna, tests were done to evaluate the condition of equipment at the plant. In order to identify any damage and determine the operating output of each unit, assessments were done of the furnaces, boilers, generators and boiler feed pumps being used in the plant. The report presents the results of these tests. This is the last of three volumes and it is divided into the followingmore » sections: (1) Condition Assessment of Unit RL-10 Turbine-Generator; (2) Condition Assessment of Unit RL-10 and RL-11 Boiler Feed Pumps.« less

  16. Capacity Adequacy and Revenue Sufficiency in Electricity Markets With Wind Power

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Levin, Todd; Botterud, Audun

    2015-05-01

    We present a computationally efficient mixed-integer program (MIP) that determines optimal generator expansion decisions, as well as periodic unit commitment and dispatch. The model is applied to analyze the impact of increasing wind power capacity on the optimal generation mix and the profitability of thermal generators. In a case study, we find that increasing wind penetration reduces energy prices while the prices for operating reserves increase. Moreover, scarcity pricing for operating reserves through reserve shortfall penalties significantly impacts the prices and profitability of thermal generators. Without scarcity pricing, no thermal units are profitable, however scarcity pricing can ensure profitability formore » peaking units at high wind penetration levels. Capacity payments can also ensure profitability, but the payments required for baseload units to break even increase with the amount of wind power. The results indicate that baseload units are most likely to experience revenue sufficiency problems when wind penetration increases and new baseload units are only developed when natural gas prices are high and wind penetration is low.« less

  17. Achieving more reliable operation of turbine generators at nuclear power plants by improving the water chemistry of the generator stator cooling system

    NASA Astrophysics Data System (ADS)

    Tyapkov, V. F.; Chudakova, I. Yu.; Alekseenko, O. A.

    2011-08-01

    Ways of improving the water chemistry used in the turbine generator stator's cooling systems at Russian nuclear power plants are considered. Data obtained from operational chemical monitoring of indicators characterizing the quality of cooling water in the turbine generator stator cooling systems of operating power units at nuclear power plants are presented.

  18. 78 FR 47800 - License Renewal Application for Byron Station, Units 1 and 2; Exelon Generation Company, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-06

    ... Application for Byron Station, Units 1 and 2; Exelon Generation Company, LLC AGENCY: Nuclear Regulatory..., Units 1 and 2 (Byron). Byron Station is located in Byron, Illinois. The current operating license for Byron Station, Unit 1, expires on October 31, 2024, and Unit 2, expires on November 6, 2026. DATES: The...

  19. 76 FR 59175 - Sunshine Act Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-23

    ...) (Tentative) a. Southern Nuclear Operating Co. (Vogtle Electric Generating Plant, Units 3 and 4)--Appeal of LBP-10-21 (Tentative) b. Luminant Generation Company LLC (Comanche Peak Nuclear Power Plant, Units 3...) c. Progress Energy Florida, Inc. (Levy County Nuclear Power Plant, Units 1 and 2), Staff Petition...

  20. 78 FR 46379 - Exelon Generation Company, LLC, License Renewal Application for Braidwood Station, Units 1 and 2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-31

    ...On May 29, 2013, Exelon Generation Company, LLC (Exelon) submitted an application to the U.S. Nuclear Regulatory Commission (NRC) for renewal of Facility Operating Licenses (NPF-72 and NPF-77) for an additional 20 years of operation for Braidwood Station, Units 1 and 2. Braidwood Station is located in Will County, Illinois. The current operating licenses for Braidwood Station, Units 1 and 2, expire on October 17, 2026 and December 18, 2027, respectively. This notice advises the public that the NRC intends to gather information to prepare an EIS on the proposed license renewal.

  1. 77 FR 15142 - Sunshine Federal Register Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    .... Luminant Generation Company LLC (Comanche Peak Nuclear Power Plant, Units 3 and 4); Energy Northwest (Columbia Generating Station); Southern Nuclear Operating Co. (Vogtle Electric Generating Plant, Units 3 and... subscribers. If you no longer wish to receive it, or would like to be added to the distribution, please...

  2. Simulation of load-sharing in standalone distributed generation system

    NASA Astrophysics Data System (ADS)

    Ajewole, Titus O.; Craven, Robert P. M.; Kayode, Olakunle; Babalola, Olufisayo S.

    2018-05-01

    This paper presents a study on load-sharing among the component generating units of a multi-source electric microgrid that is operated as an autonomous ac supply-mode system. Emerging trend in power system development permits deployment of microgrids for standalone or stand-by applications, thereby requiring active- and reactive power sharing among the discrete generating units contained in hybrid-source microgrids. In this study, therefore, a laboratory-scale model of a microgrid energized with three renewable energy-based sources is employed as a simulation platform to investigate power sharing among the power-generating units. Each source is represented by a source emulator that captures the real operational characteristics of the mimicked generating unit and, with implementation of real-life weather data and load profiles on the model; the sharing of the load among the generating units is investigated. There is a proportionate generation of power by the three source emulators, with their frequencies perfectly synchronized at the point of common coupling as a result of balance flow of power among them. This hybrid topology of renewable energy-based microgrid could therefore be seamlessly adapted into national energy mix by the indigenous electric utility providers in Nigeria.

  3. A Review of Operational Water Consumption and Withdrawal Factors for Electricity Generating Technologies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Macknick, Jordan; Newmark, Robin; Heath, Garvin

    2011-03-01

    This report provides estimates of operational water withdrawal and water consumption factors for electricity generating technologies in the United States. Estimates of water factors were collected from published primary literature and were not modified except for unit conversions. The presented water factors may be useful in modeling and policy analyses where reliable power plant level data are not available.

  4. 75 FR 14639 - Entergy Nuclear Operations, Inc.; Indian Point Nuclear Generating Unit Nos. 1, 2, and 3...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-26

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-003, 50-247, and 50-286; NRC-2010-0137] Entergy Nuclear Operations, Inc.; Indian Point Nuclear Generating Unit Nos. 1, 2, and 3; Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an exemption, pursuant to Title 10 of...

  5. 75 FR 77920 - Entergy Nuclear Operations, Inc.; Indian Point Nuclear Generating Unit Nos. 2 and 3; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-14

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-247 and 50-286; NRC-2008-0672] Entergy Nuclear Operations, Inc.; Indian Point Nuclear Generating Unit Nos. 2 and 3; Notice of Availability of the Final Supplement 38 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants Notice is hereby given that the U.S. Nuclear...

  6. 77 FR 41814 - Entergy Operations, Inc.; Grand Gulf Nuclear Station, Unit 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-16

    ... Unit 1 result primarily from periodic testing of diesel generators and fire water pump diesel engines... rural. GGNS Unit 1 is a General Electric Mark 3 boiling-water reactor. Identification of the Proposed... following: replacing the reactor feed pump turbine rotors; replacing the main generator current transformers...

  7. 76 FR 59748 - Sunshine Act Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-27

    .... Southern Nuclear Operating Co. (Vogtle Electric Generating Plant, Units 3 and 4)--Appeal of LBP-10-21 (Tentative). b. Luminant Generation Company LLC (Comanche Peak Nuclear Power Plant, Units 3 and 4... Florida, Inc. (Levy County Nuclear Power Plant, Units 1 and 2), Staff Petition for Review of LBP-10-20...

  8. Multi-unit Operations in Non-Nuclear Systems: Lessons Learned for Small Modular Reactors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    OHara J. M.; Higgins, J.; DAgostino, A.

    2012-01-17

    The nuclear-power community has reached the stage of proposing advanced reactor designs to support power generation for decades to come. Small modular reactors (SMRs) are one approach to meet these energy needs. While the power output of individual reactor modules is relatively small, they can be grouped to produce reactor sites with different outputs. Also, they can be designed to generate hydrogen, or to process heat. Many characteristics of SMRs are quite different from those of current plants and may be operated quite differently. One difference is that multiple units may be operated by a single crew (or a singlemore » operator) from one control room. The U.S. Nuclear Regulatory Commission (NRC) is examining the human factors engineering (HFE) aspects of SMRs to support licensing reviews. While we reviewed information on SMR designs to obtain information, the designs are not completed and all of the design and operational information is not yet available. Nor is there information on multi-unit operations as envisioned for SMRs available in operating experience. Thus, to gain a better understanding of multi-unit operations we sought the lesson learned from non-nuclear systems that have experience in multi-unit operations, specifically refineries, unmanned aerial vehicles and tele-intensive care units. In this paper we report the lessons learned from these systems and the implications for SMRs.« less

  9. 18. VIEW OF TURBINEGENERATOR UNIT NO. 19, MANUFACTURED BY GENERAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. VIEW OF TURBINE-GENERATOR UNIT NO. 19, MANUFACTURED BY GENERAL ELECTRIC IN 1959 AND RATED AT 342 MEGAWATTS; IT REMAINS IN OPERATION. THIS VIEW IS INSIDE THE GENERATING STATION OF 1959. - Commonwealth Electric Company, Fisk Street Electrical Generating Station, 1111 West Cermak Avenue, Chicago, Cook County, IL

  10. Design of a Facility to Test the Advanced Stirling Radioisotope Generator Engineering Unit

    NASA Technical Reports Server (NTRS)

    Lewandowski, Edward J.; Schreiber, Jeffrey G.; Oriti, Salvatore M.; Meer, David W.; Brace, Michael H.; Dugala, Gina

    2009-01-01

    The Advanced Stirling Radioisotope Generator (ASRG) is being considered to power deep space missions. An engineering unit, the ASRG-EU, was designed and fabricated by Lockheed Martin under contract to the Department of Energy. This unit is currently on an extended operation test at NASA Glenn Research Center to generate performance data and validate the life and reliability predictions for the generator and the Stirling convertors. A special test facility was designed and built for testing the ASRG-EU. Details of the test facility design are discussed. The facility can operate the convertors under AC bus control or with the ASRG-EU controller. It can regulate input thermal power in either a fixed temperature or fixed power mode. An enclosure circulates cooled air around the ASRG-EU to remove heat rejected from the ASRG-EU by convection. A custom monitoring and data acquisition system supports the test. Various safety features, which allow 2417 unattended operation, are discussed.

  11. "Life without nuclear power": A nuclear plant retirement formulation model and guide based on economics. San Onofre Nuclear Generating Station case: Economic impacts and reliability considerations leading to plant retirement

    NASA Astrophysics Data System (ADS)

    Wasko, Frank

    Traditionally, electric utilities have been slow to change and very bureaucratic in nature. This culture, in and of itself, has now contributed to a high percentage of United States electric utilities operating uneconomical nuclear plants (Crooks, 2014). The economic picture behind owning and operating United States nuclear plants is less than favorable for many reasons including rising fuel, capital and operating costs (EUCG, 2012). This doctoral dissertation is specifically focused on life without nuclear power. The purpose of this dissertation is to create a model and guide that will provide electric utilities who currently operate or will operate uneconomical nuclear plants the opportunity to economically assess whether or not their nuclear plant should be retired. This economic assessment and stakeholder analysis will provide local government, academia and communities the opportunity to understand how Southern California Edison (SCE) embraced system upgrade import and "voltage support" opportunities to replace "base load" generation from San Onofre Nuclear Generating Station (SONGS) versus building new replacement generation facilities. This model and guide will help eliminate the need to build large replacement generation units as demonstrated in the SONGS case analysis. The application of The Nuclear Power Retirement Model and Guide will provide electric utilities with economic assessment parameters and an evaluation assessment progression needed to better evaluate when an uneconomical nuclear plant should be retired. It will provide electric utilities the opportunity to utilize sound policy, planning and development skill sets when making this difficult decision. There are currently 62 nuclear power plants (with 100 nuclear reactors) operating in the United States (EIA, 2014). From this group, 38 are at risk of early retirement based on the work of Cooper (2013). As demonstrated in my model, 35 of the 38 nuclear power plants qualify to move to the economic assessment review and then on to the stakeholder cost benefit analysis (if model qualifications are met) leading to a final plant retirement decision. This application via the model and guide, in turn, will lead electric utilities to explore system upgrade import opportunities and mitigation measures versus building new replacement generation facilities. United States nuclear reactors are licensed for 40 years with a 20 year extension available prior to the expiration date (EIA, 2013). Since late 2012, electric power companies have announced the early retirement of four uneconomical nuclear power plants while other studies have indicated that as many as 70 percent of United States nuclear power plants are potentially at risk for early retirement (Crooks, 2014 and Cooper, 2013). A high percentage of these aforementioned nuclear plants have operating licenses that will not expire until 2030 and beyond. Thus, for the most part, replacement power contingency planning has not been initiated for these plants or is still in preliminary stages. The recent nuclear plant retirements are the first since 1998 (EIA, 2013). Decisions to retire the plants involved concerns over maintenance and repair costs as well as declining profitability (EIA, 2013). In addition, the Energy Information Administration (2010-2012) released data that demonstrated that the worst 25 percent of United States nuclear plants are far more expensive to operate and generate electricity than new gas plants. It is equally important to understand and explain the economic and power replacement implications to both ratepayers and end-users. A SONGS case study analysis will review the economic, operational and political challenges that SCE faced leading to the retirement decision of SONGS. As preface to the case study, replacement steam generators (RSGs) were installed in Unit 2 in 2009 and in Unit 3 in 2010. In January 2012, while Unit 2 was down for routine maintenance, a small leak was discovered inside a steam generator in Unit 3. Because of the situation, both units remained shut down to evaluate the cause of the leakage and to make repairs. SCE submitted plans to the Nuclear Regulatory Commission (NRC) to re-start Unit 2 at reduced power. However, concerns over the length of the review process and the high costs associated with steam generator repairs led SCE to retire both reactors (SCE SONGS Fact Sheets, 2012-2013). Finally, collaborative resource power replacement planning is needed more than ever as nuclear facilities in the United States are now being retired for economic related reasons (Crooks, 2014). This collaborative power replacement process and implementation must encompass all relevant stakeholders including state grid operators, ratepayers, shareholders and the electric utility company.

  12. 75 FR 52045 - Arizona Public Service Company, Palo Verde Nuclear Generating Station, Unit 3; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-24

    ... Company, Palo Verde Nuclear Generating Station, Unit 3; Environmental Assessment and Finding of No.... NPF-74, issued to Arizona Public Service Company (APS, the licensee), for operation of Palo Verde... Statement for the Palo Verde Nuclear Generating Station, NUREG-0841, dated February 1982. Agencies and...

  13. Programmable Pulse Generator

    NASA Technical Reports Server (NTRS)

    Rhim, W. K.; Dart, J. A.

    1982-01-01

    New pulse generator programmed to produce pulses from several ports at different pulse lengths and intervals and virtually any combination and sequence. Unit contains a 256-word-by-16-bit memory loaded with instructions either manually or by computer. Once loaded, unit operates independently of computer.

  14. US Greenhouse Gas (GHG) Emissions and Avoided Emissions and Generation Tool Training (AVERT) (2015 EIC)

    EPA Pesticide Factsheets

    AVERT captures the actual historical behavior of electricity generating units' (EGUs’) operation on an hourly basis to predict how EGUs will operate with additional EE/RE delivered to the electricity grid.

  15. 78 FR 16302 - Crystal River Unit 3 Nuclear Generating Plant, Application for Amendment to Facility Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-14

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-302; NRC-2011-0301] Crystal River Unit 3 Nuclear... the Crystal River Unit 3 Nuclear Generating Plant (CR-3), located in Florida, Citrus County. The... notice (if that document is available in ADAMS) is provided the first time that a document is referenced...

  16. 75 FR 4426 - Florida Power and Light Company; Turkey Point Nuclear Generating Units 3 and 4; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-27

    ... Light Company; Turkey Point Nuclear Generating Units 3 and 4; Environmental Assessment and Finding of No... (the licensee), for operation of the Turkey Point Units 3 and 4, located in Miami, Florida. In...-ductility temperature) of the Linde 80 weld materials present in the beltline region of the Turkey Point...

  17. Failure detection in high-performance clusters and computers using chaotic map computations

    DOEpatents

    Rao, Nageswara S.

    2015-09-01

    A programmable media includes a processing unit capable of independent operation in a machine that is capable of executing 10.sup.18 floating point operations per second. The processing unit is in communication with a memory element and an interconnect that couples computing nodes. The programmable media includes a logical unit configured to execute arithmetic functions, comparative functions, and/or logical functions. The processing unit is configured to detect computing component failures, memory element failures and/or interconnect failures by executing programming threads that generate one or more chaotic map trajectories. The central processing unit or graphical processing unit is configured to detect a computing component failure, memory element failure and/or an interconnect failure through an automated comparison of signal trajectories generated by the chaotic maps.

  18. 77 FR 66641 - In the Matter of Entergy Nuclear Operations, Inc.; Entergy Nuclear Indian Point 2, LLC; Entergy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... Unit 1 structure. However, neither the diesel generator fire zone nor any OMAs related to the Unit 2 station blackout diesel generator were included in the licensee's request for exemptions. As a result, the... ``However, neither the diesel generator fire [DELETED (area)] zone * * *'' Response Fire zones are subsets...

  19. Network integration of distributed power generation

    NASA Astrophysics Data System (ADS)

    Dondi, Peter; Bayoumi, Deia; Haederli, Christoph; Julian, Danny; Suter, Marco

    The world-wide move to deregulation of the electricity and other energy markets, concerns about the environment, and advances in renewable and high efficiency technologies has led to major emphasis being placed on the use of small power generation units in a variety of forms. The paper reviews the position of distributed generation (DG, as these small units are called in comparison with central power plants) with respect to the installation and interconnection of such units with the classical grid infrastructure. In particular, the status of technical standards both in Europe and USA, possible ways to improve the interconnection situation, and also the need for decisions that provide a satisfactory position for the network operator (who remains responsible for the grid, its operation, maintenance and investment plans) are addressed.

  20. Inventory of power plants in the United States as of January 1, 1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    The Inventory of Power Plants in the United States provides annual statistics on generating units operated by electric utilities in the US (the 50 States and the District of Columbia). Statistics presented in this report reflect the status of generating units as of January 1, 1998. The publication also provides a 10-year outlook for generating unit additions and generating unit changes. This report is prepared annually by the Energy Information Administration (EIA). Data summarized in this report are useful to a wide audience. This is a report of electric utility data; in cases where summary data or nonconfidential data ofmore » nonutilities are presented, it is specifically noted as nonutility data. 19 figs., 36 tabs.« less

  1. 75 FR 6736 - FirstEnergy Nuclear Operating Company, FirstEnergy Nuclear Generation Corp., Ohio Edison Company...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-10

    ..., Beaver Valley Power Station, Unit Nos. 1 and 2; Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an exemption, pursuant to... Operating Company (licensee), for operation of the Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS-1...

  2. Installation of new Generation General Purpose Computer (GPC) compact unit

    NASA Technical Reports Server (NTRS)

    1991-01-01

    In the Kennedy Space Center's (KSC's) Orbiter Processing Facility (OPF) high bay 2, Spacecraft Electronics technician Ed Carter (right), wearing clean suit, prepares for (26864) and installs (26865) the new Generation General Purpose Computer (GPC) compact IBM unit in Atlantis', Orbiter Vehicle (OV) 104's, middeck avionics bay as Orbiter Systems Quality Control technician Doug Snider looks on. Both men work for NASA contractor Lockheed Space Operations Company. All three orbiters are being outfitted with the compact IBM unit, which replaces a two-unit earlier generation computer.

  3. CSG delivery and installation

    NASA Image and Video Library

    2010-10-27

    John C. Stennis Space Center employees complete installation of a chemical steam generator (CSG) unit at the site's E-2 Test Stand. On Oct. 24, 2010. The unit will undergo verification and validation testing on the E-2 stand before it is moved to the A-3 Test Stand under construction at Stennis. Each CSG unit includes three modules. Steam generated by the nine CSG units that will be installed on the A-3 stand will create a vacuum that allows Stennis operators to test next-generation rocket engines at simulated altitudes up to 100,000 feet.

  4. Incorporating operational flexibility into electric generation planning Impacts and methods for system design and policy analysis

    NASA Astrophysics Data System (ADS)

    Palmintier, Bryan S.

    This dissertation demonstrates how flexibility in hourly electricity operations can impact long-term planning and analysis for future power systems, particularly those with substantial variable renewables (e.g., wind) or strict carbon policies. Operational flexibility describes a power system's ability to respond to predictable and unexpected changes in generation or demand. Planning and policy models have traditionally not directly captured the technical operating constraints that determine operational flexibility. However, as demonstrated in this dissertation, this capability becomes increasingly important with the greater flexibility required by significant renewables (>= 20%) and the decreased flexibility inherent in some low-carbon generation technologies. Incorporating flexibility can significantly change optimal generation and energy mixes, lower system costs, improve policy impact estimates, and enable system designs capable of meeting strict regulatory targets. Methodologically, this work presents a new clustered formulation that tractably combines a range of normally distinct power system models, from hourly unit-commitment operations to long-term generation planning. This formulation groups similar generators into clusters to reduce problem size, while still retaining the individual unit constraints required to accurately capture operating reserves and other flexibility drivers. In comparisons against traditional unit commitment formulations, errors were generally less than 1% while run times decreased by several orders of magnitude (e.g., 5000x). Extensive numerical simulations, using a realistic Texas-based power system show that ignoring flexibility can underestimate carbon emissions by 50% or result in significant load and wind shedding to meet environmental regulations. Contributions of this dissertation include: 1. Demonstrating that operational flexibility can have an important impact on power system planning, and describing when and how these impacts occur; 2. Demonstrating that a failure to account for operational flexibility can result in undesirable outcomes for both utility planners and policy analysts; and 3. Extending the state of the art for electric power system models by introducing a tractable method for incorporating unit commitment based operational flexibility at full 876o hourly resolution directly into planning optimization. Together these results encourage and offer a new flexibility-aware approach for capacity planning and accompanying policy design that can enable cleaner, less expensive electric power systems for the future. (Copies available exclusively from MIT Libraries, libraries.mit.edu/docs - docs mit.edu)

  5. Light Water Reactor Sustainability Program Integrated Program Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCarthy, Kathryn A.; Busby, Jeremy; Hallbert, Bruce

    2014-04-01

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 70%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to experience a 31% growth from 2009 to 2035. At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license for a total of 60 years of operation. Figure E-1 shows projected nuclear energy contribution tomore » the domestic generating capacity. If current operating nuclear power plants do not operate beyond 60 years, the total fraction of generated electrical energy from nuclear power will begin to decline—even with the expected addition of new nuclear generating capacity. The oldest commercial plants in the United States reached their 40th anniversary in 2009. The U.S. Department of Energy Office of Nuclear Energy’s Research and Development Roadmap (Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: (1) develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; (2) develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; (3) develop sustainable nuclear fuel cycles; and (4) understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans.« less

  6. High flexible Hydropower Generation concepts for future grids

    NASA Astrophysics Data System (ADS)

    Hell, Johann

    2017-04-01

    The ongoing changes in electric power generation are resulting in new requirements for the classical generating units. In consequence a paradigm change in operation of power systems is necessary and a new approach in finding solutions is needed. The presented paper is dealing with the new requirements on current and future energy systems with the focus on hydro power generation. A power generation landscape for some European regions is shown and generation and operational flexibility is explained. Based on the requirements from the Transmission System Operator in UK, the transient performance of a Pumped Storage installation is discussed.

  7. Evaluating the impacts of real-time pricing on the usage of wind generation

    DOE PAGES

    Sioshansi, Ramteen; Short, Walter

    2009-02-13

    One of the impediments to large-scale use of wind generation within power systems is its nondispatchability and variable and uncertain real-time availability. Operating constraints on conventional generators such as minimum generation points, forbidden zones, and ramping limits as well as system constraints such as power flow limits and ancillary service requirements may force a system operator to curtail wind generation in order to ensure feasibility. Furthermore, the pattern of wind availability and electricity demand may not allow wind generation to be fully utilized in all hours. One solution to these issues, which could reduce these inflexibilities, is the use ofmore » real-time pricing (RTP) tariffs which can both smooth-out the diurnal load pattern in order to reduce the impact of binding unit operating and system constraints on wind utilization, and allow demand to increase in response to the availability of costless wind generation. As a result, we use and analyze a detailed unit commitment model of the Texas power system with different estimates of demand elasticities to demonstrate the potential increases in wind generation from implementing RTP.« less

  8. 76 FR 6836 - Entergy Operations, Inc.; Notice of Withdrawal of Application for Amendment to Facility Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-08

    .... NPF-38 for the Waterford Steam Electric Station, Unit 3, located in St. Charles Parish, Louisiana. In view of the originally planned steam generator (SG) replacement during the spring 2011 refueling outage... to TS 6.5.9, ``Steam Generator (SG) Program,'' and TS 6.9.1.5, ``Steam Generator Tube Inspection...

  9. 78 FR 75342 - Information Collection Request Submitted to OMB for Review and Approval; Comment Request; NSPS...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-11

    ...- Institutional Steam Generating Units (Renewal) AGENCY: Environmental Protection Agency (EPA). ACTION: Notice... for Small Industrial- Commercial-Institutional Steam Generating Units (40 CFR Part 60, Subpart Dc.... Respondents/affected entities: Owners or operators of small industrial-commercial-institutional steam...

  10. Ultracapacitors for fuel saving in small size hybrid vehicles

    NASA Astrophysics Data System (ADS)

    Solero, L.; Lidozzi, A.; Serrao, V.; Martellucci, L.; Rossi, E.

    The main purpose of the paper is to describe a small size hybrid vehicle having ultracapacitors as on-board storage unit. The vehicle on-board main power supply is achieved by a genset being formed of a 250 cm 3 internal combustion engine and a permanent magnet synchronous electric generator, whereas 4 16V-500F ultracapacitors modules are connected in series in order to supply as well as to store the power peaks during respectively acceleration and braking vehicle modes of operation. The traction power is provided by a permanent magnet synchronous electric motor, whereas a distributed power electronic interface is in charge of all the required electronic conversions as well of controlling the operating conditions for each power unit. The paper discusses the implemented control strategy and shows experimental results on the modes of operation of both generation unit and storage unit.

  11. The impacts of meeting a tight CO2 performance standard on the electric power sector

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hanson, Donald; Schmalzer, David; Nichols, Christopher

    This paper presents innovative modeling of complex interactions among gas-fired generators, coal-fired power plants, and renewables (wind and solar) when pushed hard to reduce CO2 emissions. A hypothetical CO2 technology performance standard, giving rise to a shadow price on CO2 emissions, was specified as part of the study design. In this work we see gas generation rapidly replacing coal generation. To understand the fate of coal based generation, it is important to examine trends at a granular level. An important feature of our model, the Electricity Supply and Investment Model (ESIM) is that it contains a unit inventory with unitmore » characteristics and a memory of how each unit is operated over time. Cycling damages that individual coal units incur are a function of cumulative wear and tear over time. The expected remaining life of a cycled coal unit will depend on the severity of the cycling and for how many years. Deteriorating operating characteristics of a cycled unit over time results in higher operating costs, slipping down the dispatch loading order, and hence an acceleration of cycling damage, that is, a viscous circle of decline. The rate of CFPP retirements will increase for lower gas prices, higher price on CO2 emissions, and greater penetration of variable and intermittent renewables. Published by Elsevier B.V.« less

  12. Global Thermal Power Plants Database: Unit-Based CO2, SO2, NOX and PM2.5 Emissions in 2010

    NASA Astrophysics Data System (ADS)

    Tong, D.; Qiang, Z.; Davis, S. J.

    2016-12-01

    There are more than 30,000 thermal power plants now operating worldwide, reflecting a tremendously diverse infrastructure that includes units burning oil, natural gas, coal and biomass and ranging in capacity from <1MW to >1GW. Although the electricity generated by this infrastructure is vital to economic activities across the world, it also produces more CO2 and air pollution emissions than any other industry sector. Here we present a new database of global thermal power-generating units and their emissions as of 2010, GPED (Global Power Emissions Database), including the detailed unit information of installed capacity, operation year, geographic location, fuel type and control measures for more than 70000 units. In this study, we have compiled, combined, and harmonized the available underlying data related to thermal power-generating units (e.g. eGRID of USA, CPED of China and published Indian power plants database), and then analyzed the generating capacity, capacity factor, fuel type, age, location, and installed pollution-control technology in order to determine those units with disproportionately high levels of emissions. In total, this work is of great importance for improving spatial distribution of global thermal power plants emissions and exploring their environmental impacts at global scale.

  13. Study on Operation Optimization of Pumping Station's 24 Hours Operation under Influences of Tides and Peak-Valley Electricity Prices

    NASA Astrophysics Data System (ADS)

    Yi, Gong; Jilin, Cheng; Lihua, Zhang; Rentian, Zhang

    2010-06-01

    According to different processes of tides and peak-valley electricity prices, this paper determines the optimal start up time in pumping station's 24 hours operation between the rating state and adjusting blade angle state respectively based on the optimization objective function and optimization model for single-unit pump's 24 hours operation taking JiangDu No.4 Pumping Station for example. In the meantime, this paper proposes the following regularities between optimal start up time of pumping station and the process of tides and peak-valley electricity prices each day within a month: (1) In the rating and adjusting blade angle state, the optimal start up time in pumping station's 24 hours operation which depends on the tide generation at the same day varies with the process of tides. There are mainly two kinds of optimal start up time which include the time at tide generation and 12 hours after it. (2) In the rating state, the optimal start up time on each day in a month exhibits a rule of symmetry from 29 to 28 of next month in the lunar calendar. The time of tide generation usually exists in the period of peak electricity price or the valley one. The higher electricity price corresponds to the higher minimum cost of water pumping at unit, which means that the minimum cost of water pumping at unit depends on the peak-valley electricity price at the time of tide generation on the same day. (3) In the adjusting blade angle state, the minimum cost of water pumping at unit in pumping station's 24 hour operation depends on the process of peak-valley electricity prices. And in the adjusting blade angle state, 4.85%˜5.37% of the minimum cost of water pumping at unit will be saved than that of in the rating state.

  14. Natural Convection Cooling of the Advanced Stirling Radioisotope Generator Engineering Unit

    NASA Technical Reports Server (NTRS)

    Lewandowski, Edward J.; Hill, Dennis

    2011-01-01

    After fueling and prior to launch, the Advanced Stirling Radioisotope Generator (ASRG) will be stored for a period of time then moved to the launch pad for integration with the space probe and mounting on the launch vehicle. During this time, which could be as long as 3 years, the ASRG will operate continuously with heat rejected from the housing and fins. Typically, the generator will be cooled by forced convection using fans. During some of the ground operations, maintaining forced convection may add significant complexity, so allowing natural convection may simplify operations. A test was conducted on the ASRG Engineering Unit (EU) to quantify temperatures and operating parameters with natural convection only and determine if the EU could be safely operated in such an environment. The results show that with natural convection cooling the ASRG EU Stirling convertor pressure vessel temperatures and other parameters had significant margins while the EU was operated for several days in this configuration. Additionally, an update is provided on ASRG EU testing at NASA Glenn Research Center, where the ASRG EU has operated for over 16,000 hr and underwent extensive testing.

  15. A Formula for the Units to Satisfy an Operation's Desired Rate of Return in CVP Analysis--A Conceptual Approach

    ERIC Educational Resources Information Center

    Anderson, Johann A.; Leese, Wallace R.

    2016-01-01

    A common formula presented in many managerial- and cost-accounting textbooks makes possible the determination of the quantity of units which must be produced and sold to generate a desired dollar-amount of operating income. This article addresses the question "What formula can be used to determine the quantity of units needed to yield a…

  16. Megawatt low-temperature DC plasma generator with divergent channels of gas-discharge tract

    NASA Astrophysics Data System (ADS)

    Gadzhiev, M. Kh.; Isakaev, E. Kh.; Tyuftyaev, A. S.; Yusupov, D. I.; Sargsyan, M. A.

    2017-04-01

    We have developed and studied a new effective megawatt double-unit generator of low-temperature argon plasma, which belongs to the class of dc plasmatrons and comprises the cathode and anode units with divergent gas-discharge channels. The generator has an efficiency of about 80-85% and ensures a long working life at operating currents up to 4000 A.

  17. Station blackout transient at the Browns Ferry Unit 1 Plant: a severe accident sequence analysis (SASA) program study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schultz, R.R.

    1982-01-01

    Operating plant transients are of great interest for many reasons, not the least of which is the potential for a mild transient to degenerate to a severe transient yielding core damage. Using the Browns Ferry (BF) Unit-1 plant as a basis of study, the station blackout sequence was investigated by the Severe Accident Sequence Analysis (SASA) Program in support of the Nuclear Regulatory Commission's Unresolved Safety Issue A-44: Station Blackout. A station blackout transient occurs when the plant's AC power from a comemrcial power grid is lost and cannot be restored by the diesel generators. Under normal operating conditions, fmore » a loss of offsite power (LOSP) occurs (i.e., a complete severance of the BF plants from the Tennessee Valley Authority (TVA) power grid), the eight diesel generators at the three BF units would quickly start and power the emergency AC buses. Of the eight diesel generators, only six are needed to safely shut down all three units. Examination of BF-specific data show that LOSP frequency is low at Unit 1. The station blackout frequency is even lower (5.7 x 10/sup -4/ events per year) and hinges on whether the diesel generators start. The frequency of diesel generator failure is dictated in large measure by the emergency equipment cooling water (EECW) system that cools the diesel generators.« less

  18. Design and process integration of organic Rankine cycle utilizing biomass for power generation

    NASA Astrophysics Data System (ADS)

    Ependi, S.; Nur, T. B.

    2018-02-01

    Indonesia has high potential biomass energy sources from palm oil mill industry activities. The growing interest on Organic Rankine Cycle (ORC) application to produce electricity by utilizing biomass energy sources are increasingly due to its successfully used for generating electricity from rejected waste heat to the environment in industrial processes. In this study, the potential of the palm oil empty fruit bunch, and wood chip have been used as fuel for biomass to generate electricity based ORC with combustion processes. The heat from combustion burner was transfer by thermal oil heater to evaporate ORC working fluid in the evaporator unit. The Syltherm-XLT thermal oil was used as the heat carrier from combustion burner, while R245fa was used as the working fluid for ORC unit. Appropriate designs integration from biomass combustion unit to ORC unit have been analyzed and proposed to generate expander shaft-work. Moreover, the effect of recuperator on the total system efficiency has also been investigated. It was observed that the fuel consumption was increased when the ORC unit equipped recuperator operated until certain pressure and decreased when operated at high pressure.

  19. 78 FR 78294 - Airworthiness Directives; Airbus Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... Control Unit--Constant Speed Motor/Generator (GCU-CSM/G) failed the operational test. Investigations... airplanes. This proposed AD was prompted by the failure of the generator control unit-constant speed motor... costing up to $17,314, for a cost of up to $17,399 per product. We have no way of determining the number...

  20. 77 FR 77073 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-31

    ... Activities; Submission to OMB for Review and Approval; Comment Request; NSPS for Fossil Fuel Fired Steam... www.regulations.gov . Title: NSPS for Fossil Fuel Fired Steam Generating Units(Renewal). ICR Numbers.... Respondents/Affected Entities: Owners or operators of fossil fuel fired steam generating units. Estimated...

  1. 77 FR 16278 - License Renewal Application for Indian Point Nuclear Generating Units 2 and 3; Entergy Nuclear...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-20

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-247 and 50-286; NRC-2008-0672] License Renewal Application for Indian Point Nuclear Generating Units 2 and 3; Entergy Nuclear Operations, Inc. AGENCY: Nuclear Regulatory Commission. ACTION: License renewal application; intent to prepare supplement to final...

  2. 43 CFR 3287.2 - When may BLM grant a suspension of unit obligations?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., the unit operator is prevented from complying with such obligations, in whole or in part, by: (1) Acts... operator's inability to obtain an electrical sales contract, or when poor economics affect the electrical generation market, limiting the opportunity to obtain a viable sales contract. BLM may grant a suspension of...

  3. 43 CFR 3287.2 - When may BLM grant a suspension of unit obligations?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., the unit operator is prevented from complying with such obligations, in whole or in part, by: (1) Acts... operator's inability to obtain an electrical sales contract, or when poor economics affect the electrical generation market, limiting the opportunity to obtain a viable sales contract. BLM may grant a suspension of...

  4. 43 CFR 3287.2 - When may BLM grant a suspension of unit obligations?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., the unit operator is prevented from complying with such obligations, in whole or in part, by: (1) Acts... operator's inability to obtain an electrical sales contract, or when poor economics affect the electrical generation market, limiting the opportunity to obtain a viable sales contract. BLM may grant a suspension of...

  5. Project Profile: Hydrogen Fuel Cell Mobile Lighting Tower (HFCML)

    NASA Technical Reports Server (NTRS)

    McLaughlin, Russell

    2013-01-01

    NASA is committed to finding innovative solutions that improve the operational performance of ground support equipment while providing environment and cost benefits, as well. Through the Hydrogen Fuel Cell Mobile Lighting Tower (HFCML) project, NASA gained operational exposure to a novel application of high efficiency technologies. Traditionally, outdoor lighting and auxiliary power at security gates, launch viewing sites, fallback areas, outage support, and special events is provided by diesel generators with metal halide lights. Diesel generators inherently contribute to C02, NOx, particulate emissions, and are very noisy. In 2010, engineers from NASA's Technology Evaluation for Environmental Risk Mitigation Principal Center (TEERM) introduced KSC operations to a novel technology for outdoor lighting needs. Developed by a team led by Sandia National Laboratory (SNL), the technology pairs a 5kW hydrogen fuel cell with robust high efficiency plasma lights in a towable trailer. Increased efficiency, in both the fuel cell power source and lighting load, yields longer run times between fueling operations while providing greater auxiliary power. Because of the unit's quiet operation and no exhaust fumes, it is capable of being used indoors and in emergency situations, and meets the needs of all other operational roles for metal halide/diesel generators. The only discharge is some water and warm air. Environmental benefits include elimination of diesel particulate emissions and estimated 73% greenhouse gas emissions savings when the hydrogen source is natural gas (per GREET model). As the technology matures the costs could become competitive for the fuel cell units which are approximately 5 times diesel units. Initial operational . concerns included the hydrogen storage tanks and valves, lightning safety/grounding, and required operating and refueling procedures. TEERM facilitated technical information exchange (design drawings, technical standards, and operations manuals) necessary for KSC hydrogen system experts to approve use of the HFCML unit, including initiating the environmental checklist (i.e. exterior lighting waiver due to sea turtles), and development of operations and maintenance instructions. TEERM worked with SNL to establish a bailment agreement for KSC to utilize a Beta unit as part of normal Center Operations for a period of twelve months.

  6. CSG delivery and installation

    NASA Image and Video Library

    2010-10-27

    The first of nine chemical steam generator (CSG) units that will be used on the A-3 Test Stand is prepared for installation Oct. 24, 2010, at John C. Stennis Space Center. The unit was installed at the E-2 Test Stand for verification and validation testing before it is moved to the A-3 stand. Steam generated by the nine CSG units that will be installed on the A-3 stand will create a vacuum that allows Stennis operators to test next-generation rocket engines at simulated altitudes up to 100,000 feet.

  7. CSG delivery and installation

    NASA Image and Video Library

    2010-10-22

    The first of nine chemical steam generator (CSG) units that will be used on the A-3 Test Stand arrived at John. C. Stennis Space Center on Oct. 22, 2010. The unit was installed at the E-2 Test Stand for verification and validation testing before it is moved to the A-3 stand. Steam generated by the nine CSG units that will be installed on the A-3 stand will create a vacuum that allows Stennis operators to test next-generation rocket engines at simulated altitudes up to 100,000 feet.

  8. Design of a Facility to Test the Advanced Stirling Radioisotope Generator Engineering Unit

    NASA Technical Reports Server (NTRS)

    Lewandowski, Edward J.; Schreiber, Jeffrey G.; Oriti, Salvatore M.; Meer, David W.; Brace, Michael H.; Dugala, Gina

    2010-01-01

    The Advanced Stirling Radioisotope Generator (ASRG), a high efficiency generator, is being considered for space missions. An engineering unit, the ASRG engineering unit (EU), was designed and fabricated by Lockheed Martin under contract to the Department of Energy. This unit is currently under extended operation test at the NASA Glenn Research Center (GRC) to generate performance data and validate the life and reliability predictions for the generator and the Stirling convertors. A special test facility was designed and built for the ASRG EU. This paper summarizes details of the test facility design, including the mechanical mounting, heat-rejection system, argon system, control systems, and maintenance. The effort proceeded from requirements definition through design, analysis, build, and test. Initial testing and facility performance results are discussed.

  9. Fixed-speed and Variable-speed Pumped Storage Dispatch Model in Power Systems with High Renewable Penetration

    NASA Astrophysics Data System (ADS)

    Yuan, Bo; Zong, Jin; Xu, Zhicheng

    2018-06-01

    According to different operating characteristics of pumped storage fixed speed unit and variable speed unit, a joint dispatching model of pumped storage unit and other types of units based on mixed integer linear optimization is constructed. The model takes into account the operating conditions, reservoir capacity, cycle type and other pumped storage unit constraints, but also consider the frequent start and stop and the stability of the operation of the unit caused by the loss. Using the Cplex solver to solve the model, the empirical example of the provincial power grid shows that the model can effectively arrange the pumping storage speed and the dispatching operation of the variable speed unit under the precondition of economic life of the unit, and give full play to the function of peak shaving and accommodating new energy. Because of its more flexible regulation characteristics of power generation and pumping conditions, the variable speed unit can better improve the operating conditions of other units in the system and promote the new energy dissipation.

  10. Smart house-based optimal operation of thermal unit commitment for a smart grid considering transmission constraints

    NASA Astrophysics Data System (ADS)

    Howlader, Harun Or Rashid; Matayoshi, Hidehito; Noorzad, Ahmad Samim; Muarapaz, Cirio Celestino; Senjyu, Tomonobu

    2018-05-01

    This paper presents a smart house-based power system for thermal unit commitment programme. The proposed power system consists of smart houses, renewable energy plants and conventional thermal units. The transmission constraints are considered for the proposed system. The generated power of the large capacity renewable energy plant leads to the violated transmission constraints in the thermal unit commitment programme, therefore, the transmission constraint should be considered. This paper focuses on the optimal operation of the thermal units incorporated with controllable loads such as Electrical Vehicle and Heat Pump water heater of the smart houses. The proposed method is compared with the power flow in thermal units operation without controllable loads and the optimal operation without the transmission constraints. Simulation results show the validation of the proposed method.

  11. Operational data and thermodynamic modeling of a Stirling-dish demonstration installation in desert conditions

    NASA Astrophysics Data System (ADS)

    Nilsson, Martin; Jamot, Jakob; Malm, Tommy

    2017-06-01

    To field test its Stirling-dish unit, Cleanergy AB of Sweden in Q1 2015 built a ten unit demo park in Dubai. The first STE (Solar Thermal Energy) generation of its Stirling genset, the C11S, had at its core an 11 kWel Stirling engine/generator combination. The genset was mated with a parabolic concentrator developed for the genset by a supplier. Local weather conditions in Dubai provide opportunities to test performance in an environment with high insolation and high ambient temperature. In addition, the conditions in Dubai are windy, salty, humid and dusty, historically challenging for solar technologies [1]. In Q1 2016 one of the C11S Stirling-dish units was replaced by the first prototype of Cleanergy's second generation Stirling genset, the Sunbox, and an in-house developed parabolic concentrator. Operational data from field testing during the spring of 2016 are presented and discussed and show the large performance improvement achieved with the Sunbox unit.

  12. Extended Operation of Stirling Convertors at NASA Glenn Research Center

    NASA Technical Reports Server (NTRS)

    Oriti, Salvatore, M.

    2012-01-01

    NASA Glenn Research Center (GRC) has been supporting development of free-piston Stirling conversion technology for spaceflight electrical power generation since 1999. GRC has also been supporting the development of the Advanced Stirling Radioisotope Generator (ASRG) since 2006. A key element of the ASRG project is providing life, reliability, and performance data for the Advanced Stirling Convertor (ASC). The Thermal Energy Conversion branch at GRC is conducting extended operation of several free-piston Stirling convertors. The goal of this effort is to generate long-term performance data (tens of thousands of hours) on multiple units to build a life and reliability database. Currently, GRC is operating 18 convertors. This hardware set includes Technology Demonstration Convertors (TDCs) from Infinia Corporation, of which one pair (TDCs #13 and #14) has accumulated over 60,000 hr (6.8 years) of operation. Also under test are various Sunpower, Inc. convertors that were fabricated during the ASC development activity, including ASC-0, ASC-E (including those in the ASRG engineering unit), and ASC-E2. The ASC-E2s also completed, or are in progress of completing workmanship vibration testing, performance mapping, and extended operation. Two ASC-E2 units will also be used for durability testing, during which components will be stressed to levels above nominal mission usage. Extended operation data analyses from these tests are covered in this paper.

  13. AUTOMOTIVE DIESEL MAINTENANCE 2. UNIT XVI, LEARNING ABOUT AC GENERATOR (ALTERNATOR) PRINCIPLES (PART I).

    ERIC Educational Resources Information Center

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 25-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATING PRINCIPLES OF ALTERNATING CURRENT GENERATORS USED ON DIESEL POWERED EQUIPMENT. TOPICS ARE REVIEWING ELECTRICAL FUNDAMENTALS, AND OPERATING PRINCIPLES OF ALTERNATORS. THE MODULE CONSISTS OF A SELF-INSTRUCTIONAL PROGRAMED TRAINING FILM "AC GENERATORS…

  14. High temperature tubular solid oxide fuel cell development

    NASA Astrophysics Data System (ADS)

    Ray, E. R.

    Important to the development commercialization of any new technology is a field test program. This is a mutually beneficial program for both the developer and the prospective user. The developer is able to acquire valuable field operating experience that is not available in a laboratory while the user has the opportunity to become familiar with the new technology and gains a working knowledge of it through hands-on experience. Westinghouse, recognizing these benefits, initiated a program in 1986 by supplying a 400 W SOFC generator to Tennessee Valley Authority. This generator operated for approximately 1,760 hours and was constructed of twenty-four 30 cm thick-wall PST cells. In 1987, three, 3 kW SOFC generators were installed and operated at the facilities of the Tokyo Gas Company and the Osaka Gas Company. At Osaka Gas, two generators were used. First a training generator, operated for 2900 hours before it was replaced on a preplanned schedule with the second generator. The second generator operated for 3,600 hours. Tokyo Gas generator was operated for 4,900 hours. These generators had a 98 percent availability and measured NO(x) levels of less than 1.3 ppm. The 3 kW SOFC generators were constructed of 144 36 cm thick-wall PST cells. The 3 kW generators, as was the TVA generator, were fueled with hydrogen and carbon monoxide. The next major milestone in the field unit program was reached in early 1992 with the delivery to the UTILITIES, a consortium of the Kansai Electric Power company, the Tokyo Gas Company, and the Osaka Gas Company, of a natural gas fueled all electric SOFC system. This system is rated at a nominal 25 kW dc with a peak capacity of 40 kW dc. The NO(x) was measured at less than 0.3 ppM (corrected to 15 percent oxygen). The system consists of 1152 cells (thin-wall PST) of 50 cm active length, manufactured at the PPMF. Cells are contained in two independently controlled and operated generators.

  15. Analysis of Cycling Costs in Western Wind and Solar Integration Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jordan, G.; Venkataraman, S.

    The Western Wind and Solar Integration Study (WWSIS) examined the impact of up to 30% penetration of variable renewable generation on the Western Electricity Coordinating Council system. Although start-up costs and higher operating costs because of part-load operation of thermal generators were included in the analysis, further investigation of additional costs associated with thermal unit cycling was deemed worthwhile. These additional cycling costs can be attributed to increases in capital as well as operations and maintenance costs because of wear and tear associated with increased unit cycling. This analysis examines the additional cycling costs of the thermal fleet by leveragingmore » the results of WWSIS Phase 1 study.« less

  16. Types and analysis of defects in welding junctions of the header to steam generator shells on power-generating units with VVER-1000

    NASA Astrophysics Data System (ADS)

    Ozhigov, L. S.; Voevodin, V. N.; Mitrofanov, A. S.; Vasilenko, R. L.

    2016-10-01

    Investigation objects were metal templates, which were cut during the repair of welding junction no. 111 (header to the steam generator shell) on a power-generating unit with VVER-1000 of the South-Ukraine NPP, and substances of mud depositions collected from walls of this junction. Investigations were carried out using metallography, optical microscopy, and scanning electron microscopy with energy dispersion microanalysis by an MMO-1600-AT metallurgical microscope and a JEOL JSM-7001F scanning electron microscope with the Shottky cathode. As a result of investigations in corrosion pits and mud depositions in the area of welding junction no. 111, iron and copper-enriched particles were revealed. It is shown that, when contacting with the steel header surface, these particles can form microgalvanic cells causing reactions of iron dissolution and the pit corrosion of metal. Nearby corrosion pits in metal are microcracks, which can be effect of the stress state of metal under corrosion pits along with revealed effects of twinning. The hypothesis is expressed that pitting corrosion of metal occurred during the first operation period of the power-generating unit in the ammonia water chemistry conditions (WCC). The formation of corrosion pits and nucleating cracks from them was stopped with the further operation under morpholine WCC. The absence of macrocracks in metal of templates verifies that, during operation, welding junction no. 111 operated under load conditions not exceeding the permissible ones by design requirements. The durability of the welding junction of the header to the steam generator shell significantly depends on the technological schedule of chemical cleaning and steam generator shut-down cooling.

  17. 78 FR 285 - Supplemental Final Environmental Impact Statement for Healy Power Generation Unit #2, Healy, AK

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-03

    ... Valley Electric Association (GVEA) since 1967. Healy Unit 2 is a 50 MW coal- fired steam generator owned by AIDEA, which underwent test operation for two years as part of DOE's Clean Coal Technology Program... RUS. The RUS Electric Program is authorized to make loans and loan guarantees that finance the...

  18. 75 FR 13606 - Arizona Public Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-22

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. STN 50-528, STN 50-529, and STN 50-530; NRC-2010-0114] Arizona Public Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3; Environmental...-74, issued to Arizona Public Service Company (APS, the licensee), for operation of the Palo Verde...

  19. Rotor instability due to a gear coupling connected to a bearingless sun wheel of a planetary gear

    NASA Technical Reports Server (NTRS)

    Buehlmann, E. T.; Luzi, A.

    1989-01-01

    A 21 MW electric power generating unit comprises a gas turbine, a planetary gear, and a generator connected together by gear couplings. For simplicity of the design and high performance the pinion of the gear has no bearing. It is centered by the planet wheels only. The original design showed a strong instability and a natural frequency increasing with the load between 2 and 6.5 MW. In this operating range the natural frequency was below the operating speed of the gas turbine, n sub PT = 7729 RPM. By shortening the pinion shaft and reduction of its moment of inertia the unstable natural frequency was shifted well above the operating speed. With that measure the unit now operates with stability in the entire load range.

  20. Auction-based distributed efficient economic operations of microgrid systems

    NASA Astrophysics Data System (ADS)

    Zou, Suli; Ma, Zhongjing; Liu, Xiangdong

    2014-12-01

    This paper studies the economic operations of the microgrid in a distributed way such that the operational schedule of each of the units, like generators, load units, storage units, etc., in a microgrid system, is implemented by autonomous agents. We apply and generalise the progressive second price (PSP) auction mechanism which was proposed by Lazar and Semret to efficiently allocate the divisible network resources. Considering the economic operation for the microgrid systems, the generators play as sellers to supply energy and the load units play as the buyers to consume energy, while a storage unit, like battery, super capacitor, etc., may transit between buyer and seller, such that it is a buyer when it charges and becomes a seller when it discharges. Furthermore in a connected mode, each individual unit competes against not only the other individual units in the microgrid but also the exogenous main grid possessing fixed electricity price and infinite trade capacity; that is to say, the auctioneer assigns the electricity among all individual units and the main grid with respect to the submitted bid strategies of all individual units in the microgrid in an economic way. Due to these distinct characteristics, the underlying auction games are distinct from those studied in the literature. We show that under mild conditions, the efficient economic operation strategy is a Nash equilibrium (NE) for the PSP auction games, and propose a distributed algorithm under which the system can converge to an NE. We also show that the performance of worst NE can be bounded with respect to the system parameters, say the energy trading price with the main grid, and based upon that, the implemented NE is unique and efficient under some conditions.

  1. 40 CFR 63.9991 - What emission limitations, work practice standards, and operating limits must I meet?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Pollutants: Coal- and Oil-Fired Electric Utility Steam Generating Units Emission Limitations and Work... this subpart only if your EGU: (1) Has a system using wet or dry flue gas desulfurization technology... operate the wet or dry flue gas desulfurization technology installed on the unit consistent with § 63...

  2. 40 CFR 63.9991 - What emission limitations, work practice standards, and operating limits must I meet?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Pollutants: Coal- and Oil-Fired Electric Utility Steam Generating Units Emission Limitations and Work... this subpart only if your EGU: (1) Has a system using wet or dry flue gas desulfurization technology... operate the wet or dry flue gas desulfurization technology installed on the unit consistent with § 63...

  3. 40 CFR 63.9991 - What emission limitations, work practice standards, and operating limits must I meet?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Pollutants: Coal- and Oil-Fired Electric Utility Steam Generating Units Emission Limitations and Work... this subpart only if your EGU: (1) Has a system using wet or dry flue gas desulfurization technology... operate the wet or dry flue gas desulfurization technology installed on the unit consistent with § 63...

  4. 6. Photographic copy of a photograph taken from pasteup negatives ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Photographic copy of a photograph taken from paste-up negatives for U.S. Army Corps of Engineers document GF-500-MCP, entitled "Grand Forks Site RLS Army Operating Drawings, Master Composite Photographs for SAFEGUARD TSE Systems and Equipment," Page 9, dated 1 September 1974 (original document and negatives in possession of U.S. Army Corps of Engineers, Huntsville, AL). Photographer unknown. View of remote launch operations building, power generation room #124, showing no-break units NB-1002 (A) and NB-1001 (B). This equipment consisted of a 150 horsepower, d.c. operational motor which drove, on each end of the extended shaft, a 70 kw generator and a 30 kw generator unit. It was designed to provide continuous power service for launch equipment. In particular, the photo is an excellent representation of the shock isolation scheme, as evidenced by the supporting air springs and equipment platform - Stanley R. Mickelsen Safeguard Complex, Remote Launch Operations Building, Near Service Road exit from Patrol Road, Nekoma, Cavalier County, ND

  5. Tdp studies and tests for C. A. Energia Electrica de Venezuela (enelven) at planta ramon laguna, units RL-17 and RL-10. Volume 2. Unit RL-10 boiler condition assessment report. Export trade information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-03-28

    The study, conducted by Babcock and Wilcox, was funded by the U.S. Trade and Development agency on behalf of Enelven. In order to maximize generated power output and minimize operating costs at Planta Ramon Laguna, tests were done to evaluate the condition of equipment at the plant. In order to identify any damage and determine the operating output of each unit, assessments were done of the furnaces, boilers, generators and boiler feed pumps being used in the plant. The report presents the results of these tests. This is the second of three volumes and it includes the following section: (1)more » Condition Assessment of Unit RL-10 Boiler.« less

  6. Fluidic Emergency Thruster for Aircraft

    NASA Technical Reports Server (NTRS)

    Honda, T. S.

    1972-01-01

    The design, development, fabrication and test evaluation of two prototype fluidic emergency thrusters (FET) for aircraft stabilization are discussed. The fluidic control units were designed to provide, between two diametrically opposed nozzles, a thrust differential proportional to an input voltage signal. The emergency roll control requirements of the X-14 VTOL research aircraft were defined as typical design goals. Two control units, one on each wing tip, are intended to provide a maximum thrust of 224 pounds per unit. The units are designed to operate with 2500 psig, 2000 F gas from a solid propellant gas generator. The emergency system including the gas generator was designed to add less than 11 pounds per wing tip. The operating time under emergency conditions was specified as five seconds. The fluidic emergency thruster is similar in concept to a JATO system but has the added feature of controllable thrust.

  7. 78 FR 14842 - Crystal River Nuclear Generating Plant, Unit 3; Application for Renewal of License to Facility...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-07

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-302; NRC-2009-0039] Crystal River Nuclear Generating... in ADAMS) is provided the first time that a document is referenced. NRC's PDR: You may examine and... operating license DPR-72, which authorizes Florida Power Corporaton (FPC) to operate the Crystal River...

  8. CSG delivery and installation

    NASA Image and Video Library

    2010-10-27

    The first of nine chemical steam generator (CSG) units that will be used on the A-3 Test Stand is hoisted into place at the E-2 Test Stand at John C. Stennis Space Center on Oct. 24, 2010. The unit was installed at the E-2 stand for verification and validation testing before it is moved to the A-3 stand. Steam generated by the nine CSG units that will be installed on the A-3 stand will create a vacuum that allows Stennis operators to test next-generation rocket engines at simulated altitudes up to 100,000 feet.

  9. Research and application of thermal power unit’s load dynamic adjustment based on extraction steam

    NASA Astrophysics Data System (ADS)

    Li, Jun; Li, Huicong; Li, Weiwei

    2018-02-01

    The rapid development of heat and power generation in large power plant has caused tremendous constraints on the load adjustment of power grids and power plants. By introducing the thermodynamic system of thermal power unit, the relationship between thermal power extraction steam and unit’s load has analyzed and calculated. The practical application results show that power capability of the unit affected by extraction and it is not conducive to adjust the grid frequency. By monitoring the load adjustment capacity of thermal power units, especially the combined heat and power generating units, the upper and lower limits of the unit load can be dynamically adjusted by the operator on the grid side. The grid regulation and control departments can effectively control the load adjustable intervals of the operating units and provide reliable for the cooperative action of the power grid and power plants, to ensure the safety and stability of the power grid.

  10. 40 CFR 52.145 - Visibility protection.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... paragraph is applicable to the fossil fuel-fired, steam-generating equipment designated as Units 1, 2, and 3... applicable. Unit-Week of Maintenance means a period of 7 days during which a fossil fuel-fired steam... means million British thermal unit(s). Operating hour means any hour that fossil fuel is fired in the...

  11. 75 FR 36700 - Exelon Generation Company, LLC; Three Mile Island Nuclear Station, Unit 1; Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    ...; Three Mile Island Nuclear Station, Unit 1; Environmental Assessment and Finding of No Significant Impact... Company, LLC (the licensee), for operation of Three Mile Island Nuclear Station, Unit 1 (TMI-1), located... Three Mile Island Nuclear Station, Units 1 and 2, NUREG-0552, dated December 1972, and Generic...

  12. 77 FR 12332 - Vogtle Electric Generating Plant, Units 3 and 4; Issuance of Combined Licenses and Limited Work...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... Generating Plant, Units 3 and 4; Issuance of Combined Licenses and Limited Work Authorizations and Record of...) and Limited Work Authorization (LWA) (Nos. LWA-001 and LWA-002) and Record of Decision Issuance. FOR... and NPF-92 and Limited Work Authorizations LWA-001 and LWA-002 to Southern Nuclear Operating Company...

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Siddiqui, Afzal; Marnay, Chris

    This paper examines a California-based microgrid s decision to invest in a distributed generation (DG) unit that operates on natural gas. While the long-term natural gas generation cost is stochastic, we initially assume that the microgrid may purchase electricity at a fixed retail rate from its utility. Using the real options approach, we find natural gas generating cost thresholds that trigger DG investment. Furthermore, the consideration of operational flexibility by the microgrid accelerates DG investment, while the option to disconnect entirely from the utility is not attractive. By allowing the electricity price to be stochastic, we next determine an investmentmore » threshold boundary and find that high electricity price volatility relative to that of natural gas generating cost delays investment while simultaneously increasing the value of the investment. We conclude by using this result to find the implicit option value of the DG unit.« less

  14. German-Korean cooperation for erection and test of industrialized solar technologies

    NASA Astrophysics Data System (ADS)

    Pfeiffer, H.

    1986-01-01

    A combined small solar-wind power station and a solar-thermal experimental plant were built. The plants are designed to demonstrate the effective exploitation of solar energy and wind energy and enhanced availability achievable through combination of these two energy sources. A 14 kW wind energy converter and a 2.5 kW solar-cell generator were operated in parallel. The biaxial tracking system used on the solar generator leads to increased and constant generation of electricity throughout the day. A consumer control system switches the energy generators and the consumers in autonomous mode according to changing supply and demand. The solar powered air conditioning unit operates with an absorption type refrigerating unit, high-output flat collectors and an automatic control system. All design values are achieved on start-up of the plant.

  15. Concentrating Solar Power Projects - Solar Electric Generating Station IX |

    Science.gov Websites

    Station IX (SEGS IX) Country: United States Location: Harper Dry Lake, California (Mojave Desert) Owner(s : Parabolic trough Status: Operational Country: United States City: Harper Dry Lake State: California County

  16. Energy consumption and energy-saving potential analysis of pollutant abatement systems in a 1000MW coal-fired power plant.

    PubMed

    Yang, Hang; Zhang, Yongxin; Zheng, Chenghang; Wu, Xuecheng; Chen, Linghong; Gao, Xiang; Fu, Joshua S

    2018-05-10

    The pollutant abatement systems are widely applied in the coal-fired power sector and the energy consumption was considered an important part of the auxiliary power. An energy consumption analysis and assessment model of pollutant abatement systems in a power unit was developed based on the dynamic parameters and technology. The energy consumption of pollutant abatement systems in a 1000 MW coal-fired power unit which meet the ultra-low emission limits and the factors of operating parameters including unit load and inlet concentration of pollutants on the operating power were analyzed. The results show that the total power consumption of the pollutant abatement systems accounted for 1.27% of the gross power generation during the monitoring period. The WFGD system consumed 67% of the rate while the SCR and ESP systems consumed 8.9% and 24.1%. The power consumption rate of pollutant abatement systems decreased with the increase of unit load and increased with the increase of the inlet concentration of pollutants. The operation adjustment was also an effective method to increase the energy efficiency. For example, the operation adjustment of slurry circulation pumps could promote the energy-saving operation of WFGD system. Implication Statement The application of pollutant abatement technologies increases the internal energy consumption of the power plant, which will lead to an increase of power generation costs. The real-time energy consumption of the different pollutant abatement systems in a typical power unit is analyzed based on the dynamic operating data. Further, the influence of different operating parameters on the operating power of the system and the possible energy-saving potential are analyzed.

  17. AUTOMOTIVE DIESEL MAINTENANCE 2. UNIT XIV, UNDERSTANDING DC GENERATOR PRINCIPLES.

    ERIC Educational Resources Information Center

    Human Engineering Inst., Cleveland, OH.

    THIS MODULE OF A 25-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATING PRINCIPLES OF DIRECT CURRENT GENERATORS USED ON DIESEL POWERED EQUIPMENT. TOPICS ARE (1) WHAT IS A GENERATOR AND ITS USE, (2) SHUNT GENERATOR PRINCIPLES, (3) POWER AND RATINGS OF A GENERATOR, (4) ARMATURE REACTION, (5) WHAT IS POLARITY, (6) TWO GENERATOR…

  18. Dual-Use Applications of Infrared Sensitive Materials: Appendices

    DTIC Science & Technology

    1993-06-01

    CLUs. The Command Launch Unit and missile round each use a second generation forward looking IR detector. The CLU uses a LWIR , MCT-based, 240xI scanning...read out digitally to other display units or video equipment through a port on the unit’s side. The IR detector in the CLU operates in the LWIR for two...greater than about a kilometer needs to operate generally in the LWIR to achieve the sensitivity necessary to image objects at those distances.’ Second

  19. Electrical generating unit inventory 1976-1986: Illinois, Indiana, Kentucky, Ohio, Pennsylvania and West Virginia

    NASA Astrophysics Data System (ADS)

    Jansen, S. D.

    1981-09-01

    The ORBES region consists of all of Kentucky, most of West Virginia, substantial parts of Illinois, Indiana, and Ohio, and southwestern Pennsylvania. The inventory lists installed electrical generating capacity in commercial service as of December 1, 1976, and scheduled capacity additions and removals between 1977 and 1986 in the six ORBES states (Illinois, Indiana, Kentucky, Ohio, Pennsylvania, and West Virginia). The following information is included for each electrical generating unit: unit ID code, company index, whether point or industrial ownership, plant name, whether inside or outside the ORBES region, FIPS county code, type of unit, size in megawatts, type of megawatt rating, status of unit, data of commercial operation, scheduled retirement date, primary fuel, alternate fuel, type of cooling, source of cooling water, and source of information.

  20. Polymerase matters: non-proofreading enzymes inflate fungal community richness estimates by up to 15 %

    Treesearch

    Alena K. Oliver; Shawn P. Brown; Mac A. Callaham; Ari Jumpponen

    2015-01-01

    Rare taxa overwhelm metabarcoding data generated using next-generation sequencing (NGS). Low frequency Operational Taxonomic Units (OTUs) may be artifacts generated by PCR-amplification errors resulting from polymerase mispairing. We analyzed two Internal Transcribed Spacer 2 (ITS2) MiSeq libraries generated with proofreading (ThermoScientific Phusion

  1. Inventories of woody residues and solid wood waste in the United States, 2002

    Treesearch

    David B. McKeever

    2004-01-01

    Large amounts of woody residues and wood waste are generated annually in the United States. In 2002, an estimated 240 million metric tons was generated during the extraction of timber from the Nation’s forests, from forestry cultural operations, in the conversion of forest land to nonforest uses, in the initial processing of roundwood timber into usable products, in...

  2. Refrigeration generation using expander-generator units

    NASA Astrophysics Data System (ADS)

    Klimenko, A. V.; Agababov, V. S.; Koryagin, A. V.; Baidakova, Yu. O.

    2016-05-01

    The problems of using the expander-generator unit (EGU) to generate refrigeration, along with electricity were considered. It is shown that, on the level of the temperatures of refrigeration flows using the EGU, one can provide the refrigeration supply of the different consumers: ventilation and air conditioning plants and industrial refrigerators and freezers. The analysis of influence of process parameters on the cooling power of the EGU, which depends on the parameters of the gas expansion process in the expander and temperatures of cooled environment, was carried out. The schematic diagram of refrigeration generation plant based on EGU is presented. The features and advantages of EGU to generate refrigeration compared with thermotransformer of steam compressive and absorption types were shown, namely: there is no need to use the energy generated by burning fuel to operate the EGU; beneficial use of the heat delivered to gas from the flow being cooled in equipment operating on gas; energy production along with refrigeration generation, which makes it possible to create, using EGU, the trigeneration plants without using the energy power equipment. It is shown that the level of the temperatures of refrigeration flows, which can be obtained by using the EGU on existing technological decompression stations of the transported gas, allows providing the refrigeration supply of various consumers. The information that the refrigeration capacity of an expander-generator unit not only depends on the parameters of the process of expansion of gas flowing in the expander (flow rate, temperatures and pressures at the inlet and outlet) but it is also determined by the temperature needed for a consumer and the initial temperature of the flow of the refrigeration-carrier being cooled. The conclusion was made that the expander-generator units can be used to create trigeneration plants both at major power plants and at small energy.

  3. Tube structural integrity evaluation of Palo Verde Unit 1 steam generators for axial upper-bundle cracking

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Woodman, B.W.; Begley, J.A.; Brown, S.D.

    1995-12-01

    The analysis of the issue of upper bundle axial ODSCC as it apples to steam generator tube structural integrity in Unit 1 at the Palo Verde Nuclear generating Station is presented in this study. Based on past inspection results for Units 2 and 3 at Palo Verde, the detection of secondary side stress corrosion cracks in the upper bundle region of Unit 1 may occur at some future date. The following discussion provides a description and analysis of the probability of axial ODSCC in Unit 1 leading to the exceedance of Regulatory Guide 1.121 structural limits. The probabilities of structuralmore » limit exceedance are estimated as function of run time using a conservative approach. The chosen approach models the historical development of cracks, crack growth, detection of cracks and subsequent removal from service and the initiation and growth of new cracks during a given cycle of operation. Past performance of all Palo Verde Units as well as the historical performance of other steam generators was considered in the development of cracking statistics for application to Unit 1. Data in the literature and Unit 2 pulled tube examination results were used to construct probability of detection curves for the detection of axial IGSCC/IGA using an MRPC (multi-frequency rotating panake coil) eddy current probe. Crack growth rates were estimated from Unit 2 eddy current inspection data combined with pulled tube examination results and data in the literature. A Monte-Carlo probabilistic model is developed to provide an overall assessment of the risk of Regulatory Guide exceedance during plant operation.« less

  4. Effects of Thermal Exposure on the Optical Properties of LORD Aeroglaze A276

    NASA Technical Reports Server (NTRS)

    Ellis, David L.; Jaworske, Donald A.

    2009-01-01

    A lunar outpost will require electrical energy. One potential source is fission surface power where heat from a reactor is converted into electricity utilizing an energy conversion system, and waste heat will need to be rejected from the system. The Second Generation Radiator Demonstration Unit is a technology demonstration unit leading towards operational radiators. To approximate the infrared emittance of the lunar outpost radiators, a low-cost coating compatible with the test conditions was sought. LORD Aeroglaze A276 has a similar emittance, but its performance in air and vacuum at the desired operating temperatures was unknown. This study determined that the emittance remained above 0.86 for all conditions tested and that LORD Aeroglaze A276 is a suitable surrogate coating for the Second Generation Radiator Demonstration Unit.

  5. Realized field tests

    NASA Astrophysics Data System (ADS)

    Cordes, V.

    1983-09-01

    Three solar generator projects in developing countries are discussed. A brackish water desalination unit was developed and built. A 2.4 kW solar generator supplies the desalination unit which produces 1.5 cum drinking water per day, and the pump installed for a hoisting depth of 20 m. The unit switches on if the solar energy is sufficiently high; a 160 Ahr battery guarantees constant operation. A photovoltaically supplied UHF transmitter was installed. A 3.6 kW solar generator and a battery make transmitter and air traffic warning illumination self-sufficient. A small diesel generator is installed for emergency cases. Experience shows that solar generator (4 kW) and battery have to be enlarged. An emergency solar energy generator was installed in a hospital. The solar generator has a maximum power of 150 W; together with a battery it can deliver the energy for a minimum 5 hr of emergency illumination.

  6. 77 FR 41454 - Entergy Nuclear Indian Point Unit 2, LLC, Entergy Nuclear Indian Point Unit 3, LLC, Entergy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-13

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-247 and 50-286; NRC-2012-0168] Entergy Nuclear Indian Point Unit 2, LLC, Entergy Nuclear Indian Point Unit 3, LLC, Entergy Nuclear Operations, Inc., Indian Point Nuclear Generating Units 2 and 3; Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear Regulatory Commission (NRC...

  7. Distributed photovoltaic system impact upon utility load/supply management practices

    NASA Astrophysics Data System (ADS)

    Vachtsevanos, G. J.; Meliopoulos, A. P.; Paraskevopoulos, B. K.

    A methodology is described for simulation of the economic and technical factors of photovoltaic (PV) installations interfacing with utility load/management operations. A probabalistic technique is used to model the expected demand, reliability of the generating units, costs and profits from each unit, expected unserviced energy, and the loss of load probability. The available power from PV arrays is treated stochastically with statistical weighting on the basis of site meteorological data. The goal is to include the PV power while minimizing operational costs, taking into account the level of penetration of the total PV output. Two sample simulations for a utility with a diverse generating mix demonstrate that overall costs would decrease in both cases with PVs on-line through the emphasis on cheaper-fueled generators and peak-load shaving when possible.

  8. Opportunities for Breakthroughs in Large-Scale Computational Simulation and Design

    NASA Technical Reports Server (NTRS)

    Alexandrov, Natalia; Alter, Stephen J.; Atkins, Harold L.; Bey, Kim S.; Bibb, Karen L.; Biedron, Robert T.; Carpenter, Mark H.; Cheatwood, F. McNeil; Drummond, Philip J.; Gnoffo, Peter A.

    2002-01-01

    Opportunities for breakthroughs in the large-scale computational simulation and design of aerospace vehicles are presented. Computational fluid dynamics tools to be used within multidisciplinary analysis and design methods are emphasized. The opportunities stem from speedups and robustness improvements in the underlying unit operations associated with simulation (geometry modeling, grid generation, physical modeling, analysis, etc.). Further, an improved programming environment can synergistically integrate these unit operations to leverage the gains. The speedups result from reducing the problem setup time through geometry modeling and grid generation operations, and reducing the solution time through the operation counts associated with solving the discretized equations to a sufficient accuracy. The opportunities are addressed only at a general level here, but an extensive list of references containing further details is included. The opportunities discussed are being addressed through the Fast Adaptive Aerospace Tools (FAAST) element of the Advanced Systems Concept to Test (ASCoT) and the third Generation Reusable Launch Vehicles (RLV) projects at NASA Langley Research Center. The overall goal is to enable greater inroads into the design process with large-scale simulations.

  9. AVERT, COBRA, GHG Inventory and GreenHouse Gas (GHG) Reporting Program (2017 EIC)

    EPA Pesticide Factsheets

    AVERT captures the actual historical behavior of electricity generating units' (EGUs’) operation on an hourly basis to predict how EGUs will operate with additional EE/RE delivered to the electricity grid.

  10. International Space Station United States Orbital Segment Oxygen Generation System On-Orbit Operational Experience

    NASA Technical Reports Server (NTRS)

    Erickson, Robert J.; Howe, John, Jr.; Kulp, Galen W.; VanKeuren, Steven P.

    2008-01-01

    The International Space Station (ISS) United States Orbital Segment (USOS) Oxygen Generation System (OGS) was originally intended to be installed in ISS Node 3. The OGS rack delivery was accelerated, and it was launched to ISS in July of 2006 and installed in the US Laboratory Module. Various modification kits were installed to provide its interfaces, and the OGS was first activated in July of 2007 for 15 hours, In October of 2007 it was again activated for 76 hours with varied production rates and day/night cycling. Operational time in each instance was limited by the quantity of feedwater in a Payload Water Reservoir (PWR) bag. Feedwater will be provided by PWR bag until the USOS Water Recovery System (WRS) is delivered to SS in fall of 2008. This paper will discuss operating experience and characteristics of the OGS, as well as operational issues and their resolution.

  11. INSTRUMENTATION AND TECHNIQUES. A SELF-CONTAINED, REGULATED, BURST-FIRING CONSTANT-CURRENT AC SHOCK GENERATOR

    EPA Science Inventory

    A line- and load-regulated constant-current ac shock generator has been designed for animal behavior experiments. The self-contained unit has four operating modes, amplitude adjustment, and a leakage current detection circuit. A unique feature of this generator is that the good l...

  12. 76 FR 30206 - Southern Nuclear Operating Company, Inc., Vogtle Electric Generating Plant, Unit 1 and 2; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-24

    ... High-High, Nominal Trip Setpoint (NTSP) and Allowable Value. The Steam Generator Water Level High-High... previously evaluated is not increased. The Steam Generator Water Level High-High function revised values..., Steam Generator Water Level High-High, Nominal Trip Setpoint (NTSP) and Allowable Value. Function 5c...

  13. Current Status of Continued Operation for Kori unit 1 beyond Design Life

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tai-hyun Kim; Pan-sool Kim; Yeon-sang Yu

    2006-07-01

    Since the commercial operation of Kori Nuclear Power Plant unit 1 in April 1978, Korea has achieved rapid growth in its nuclear industry, and now has 20 operating nuclear power plants. As the design life of Kori unit 1 comes to an end, Korea Hydro and Nuclear Power Co., Ltd.(KHNP) is preparing for the continued operation of the plant for the first time in Korea. The feasibility of continued operation beyond design life has been already proven in many countries. Developed countries, such as the USA, England, Japan and so on, are also proceeding with the continued operation of NPPsmore » whose design life or license is due to expire, as long as the adequate safety and aging management review meet the acceptance criteria. Continued operation is absolutely needed for countries lacking in natural resources, such as Korea, in view of the efficient utilization of energy resources and reduction of greenhouse gases (CO{sub 2}) emission. For the continued operation beyond design life (30 yrs) of Kori unit 1, KHNP has performed Lifetime Management (PLiM) study, Periodic Safety Review (PSR), Probabilistic Safety Assessment (PSA) and Environmental Qualification (EQ), etc. and replaced main equipment, such as Steam Generators, Low Pressure Turbine Rotor, RCP Internals, Main Transformer, Main Generator, and so on. In September 2005, The Regulation of Atomic Energy Act in Korea was revised and published referring to License Renewal Rule of the USA. According to the revised regulations, KHNP is performing Life Assessment for Main Systems, Structures and Components (SSCs) and Radiological Impacts on the Environment with PSR for continued operation. (authors)« less

  14. An Analysis of the Factors Generating the Variance Between the Budgeted and Actual Operating Results of the Naval Aviation Depot at North Island, California

    DTIC Science & Technology

    2008-06-01

    management structure employs free- market system principles and encourages business-like processes that are mission driven. Since no operating funds are...variable (Potvin, 2007). 2. Unit Cost Goal NWCFs use the unit cost goal ( UCG ) for planning purposes. The UCG is an estimate of what a unit of product...mission 6. Will not interfere with depot performance This section opens the depot to the private market . 53 Chapter 159 – Real Property

  15. Optimal PGU operation strategy in CHP systems

    NASA Astrophysics Data System (ADS)

    Yun, Kyungtae

    Traditional power plants only utilize about 30 percent of the primary energy that they consume, and the rest of the energy is usually wasted in the process of generating or transmitting electricity. On-site and near-site power generation has been considered by business, labor, and environmental groups to improve the efficiency and the reliability of power generation. Combined heat and power (CHP) systems are a promising alternative to traditional power plants because of the high efficiency and low CO2 emission achieved by recovering waste thermal energy produced during power generation. A CHP operational algorithm designed to optimize operational costs must be relatively simple to implement in practice such as to minimize the computational requirements from the hardware to be installed. This dissertation focuses on the following aspects pertaining the design of a practical CHP operational algorithm designed to minimize the operational costs: (a) real-time CHP operational strategy using a hierarchical optimization algorithm; (b) analytic solutions for cost-optimal power generation unit operation in CHP Systems; (c) modeling of reciprocating internal combustion engines for power generation and heat recovery; (d) an easy to implement, effective, and reliable hourly building load prediction algorithm.

  16. Integrating Renewable Generation into Grid Operations: Four International Experiences

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weimar, Mark R.; Mylrea, Michael E.; Levin, Todd

    International experiences with power sector restructuring and the resultant impacts on bulk power grid operations and planning may provide insight into policy questions for the evolving United States power grid as resource mixes are changing in response to fuel prices, an aging generation fleet and to meet climate goals. Australia, Germany, Japan and the UK were selected to represent a range in the level and attributes of electricity industry liberalization in order to draw comparisons across a variety of regions in the United States such as California, ERCOT, the Southwest Power Pool and the Southeast Reliability Region. The study drawsmore » conclusions through a literature review of the four case study countries with regards to the changing resource mix and the electricity industry sector structure and their impact on grid operations and planning. This paper derives lessons learned and synthesizes implications for the United States based on answers to the above questions and the challenges faced by the four selected countries. Each country was examined to determine the challenges to their bulk power sector based on their changing resource mix, market structure, policies driving the changing resource mix, and policies driving restructuring. Each countries’ approach to solving those changes was examined, as well as how each country’s market structure either exacerbated or mitigated the approaches to solving the challenges to their bulk power grid operations and planning. All countries’ policies encourage renewable energy generation. One significant finding included the low- to zero-marginal cost of intermittent renewables and its potential negative impact on long-term resource adequacy. No dominant solution has emerged although a capacity market was introduced in the UK and is being contemplated in Japan. Germany has proposed the Energy Market 2.0 to encourage flexible generation investment. The grid operator in Australia proposed several approaches to maintaining synchronous generation. Interconnections to other regions provides added opportunities for balancing that would not be available otherwise, and at this point, has allowed for integration of renewables.« less

  17. Energy storage apparatus

    NASA Technical Reports Server (NTRS)

    Studer, P. A.; Evans, H. E. (Inventor)

    1978-01-01

    A high efficiency, flywheel type energy storage device which comprises an electronically commutated d.c. motor/generator unit having a massive flywheel rotor magnetically suspended around a ring shaped stator is presented. During periods of low energy demand, the storage devices were operated as a motor, and the flywheel motor was brought up to operating speed. Energy was drawn from the device functioning as a generator as the flywheel rotor rotated during high energy demand periods.

  18. 40 CFR 52.125 - Control strategy and regulations: Sulfur oxides.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 7-1-4.2(C) (Fossil fuel-fired steam generators in the Northern Arizona Intrastate Region). (1) This paragraph is applicable to the fossil fuel-fired steam generating equipment designated as Units 1, 2, and 3...) No owner or operator of the fossil fuel-fired steam generating equipment to which this paragraph is...

  19. 40 CFR 52.125 - Control strategy and regulations: Sulfur oxides.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 7-1-4.2(C) (Fossil fuel-fired steam generators in the Northern Arizona Intrastate Region). (1) This paragraph is applicable to the fossil fuel-fired steam generating equipment designated as Units 1, 2, and 3...) No owner or operator of the fossil fuel-fired steam generating equipment to which this paragraph is...

  20. 40 CFR 52.125 - Control strategy and regulations: Sulfur oxides.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 7-1-4.2(C) (Fossil fuel-fired steam generators in the Northern Arizona Intrastate Region). (1) This paragraph is applicable to the fossil fuel-fired steam generating equipment designated as Units 1, 2, and 3...) No owner or operator of the fossil fuel-fired steam generating equipment to which this paragraph is...

  1. 40 CFR 52.125 - Control strategy and regulations: Sulfur oxides.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 7-1-4.2(C) (Fossil fuel-fired steam generators in the Northern Arizona Intrastate Region). (1) This paragraph is applicable to the fossil fuel-fired steam generating equipment designated as Units 1, 2, and 3...) No owner or operator of the fossil fuel-fired steam generating equipment to which this paragraph is...

  2. 40 CFR 52.125 - Control strategy and regulations: Sulfur oxides.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 7-1-4.2(C) (Fossil fuel-fired steam generators in the Northern Arizona Intrastate Region). (1) This paragraph is applicable to the fossil fuel-fired steam generating equipment designated as Units 1, 2, and 3...) No owner or operator of the fossil fuel-fired steam generating equipment to which this paragraph is...

  3. Optimization of steam generators of NPP with WWER in operation with variable load

    NASA Astrophysics Data System (ADS)

    Parchevskii, V. M.; Shchederkina, T. E.; Gur'yanova, V. V.

    2017-11-01

    The report addresses the issue of the optimal water level in the horizontal steam generators of NPP with WWER. On the one hand, the level needs to be kept at the lower limit of the allowable range, as gravity separation, steam will have the least humidity and the turbine will operate with higher efficiency. On the other hand, the higher the level, the greater the supply of water in the steam generator, and therefore the higher the security level of the unit, because when accidents involving loss of cooling of the reactor core, the water in the steam generators, can be used for cooling. To quantitatively compare the damage from higher level to the benefit of improving the safety was assessed of the cost of one cubic meter of water in the steam generators, the formulated objective function of optimal levels control. This was used two-dimensional separation characteristics of steam generators. It is demonstrated that the security significantly shifts the optimal values of the levels toward the higher values, and this bias is greater the lower the load unit.

  4. Complex of technologies and prototype systems for eco-friendly shutdown of the power-generating, process, capacitive, and transport equipment

    NASA Astrophysics Data System (ADS)

    Smorodin, A. I.; Red'kin, V. V.; Frolov, Y. D.; Korobkov, A. A.; Kemaev, O. V.; Kulik, M. V.; Shabalin, O. V.

    2015-07-01

    A set of technologies and prototype systems for eco-friendly shutdown of the power-generating, process, capacitive, and transport equipment is offered. The following technologies are regarded as core technologies for the complex: cryogenic technology nitrogen for displacement of hydrogen from the cooling circuit of turbine generators, cryo blasting of the power units by dioxide granules, preservation of the shutdown power units by dehydrated air, and dismantling and severing of equipment and structural materials of power units. Four prototype systems for eco-friendly shutdown of the power units may be built on the basis of selected technologies: Multimode nitrogen cryogenic system with four subsystems, cryo blasting system with CO2 granules for thermal-mechanical and electrical equipment of power units, and compressionless air-drainage systems for drying and storage of the shutdown power units and cryo-gas system for general severing of the steam-turbine power units. Results of the research and pilot and demonstration tests of the operational units of the considered technological systems allow applying the proposed technologies and systems in the prototype systems for shutdown of the power-generating, process, capacitive, and transport equipment.

  5. 76 FR 29277 - Exelon Generation Company, LLC; Peach Bottom Atomic Power Station Unit Nos. 2 and 3...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-20

    ... Company, LLC; Peach Bottom Atomic Power Station Unit Nos. 2 and 3; Environmental Assessment and Finding of..., LLC (Exelon, the licensee) for operation of the Peach Bottom Atomic Power Station, Units 2 and 3...) in the Peach Bottom Atomic Power Station (PBAPS) LLRW Storage Facility. Considering the nature of the...

  6. Control system for several rotating mirror camera synchronization operation

    NASA Astrophysics Data System (ADS)

    Liu, Ningwen; Wu, Yunfeng; Tan, Xianxiang; Lai, Guoji

    1997-05-01

    This paper introduces a single chip microcomputer control system for synchronization operation of several rotating mirror high-speed cameras. The system consists of four parts: the microcomputer control unit (including the synchronization part and precise measurement part and the time delay part), the shutter control unit, the motor driving unit and the high voltage pulse generator unit. The control system has been used to control the synchronization working process of the GSI cameras (driven by a motor) and FJZ-250 rotating mirror cameras (driven by a gas driven turbine). We have obtained the films of the same objective from different directions in different speed or in same speed.

  7. CONCENTRATED ANIMAL FEEDING OPERATIONS AS A SOURCE OF EDCS AND THEIR MANAGEMENT

    EPA Science Inventory

    In the United States, there is an estimated 376,000 animal feed operations, generating approximately 128 billion pounds of waste each year. A facility is an animal feed operation (AFO) if animals are stabled/confined, or fed/maintained, for 45 days or more within any 12-month per...

  8. 45. William E. Barrett, Photographer, August 1975. EARLY STEAM GENERATING ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. William E. Barrett, Photographer, August 1975. EARLY STEAM GENERATING UNIT USED TO PRODUCE ELECTRICITY FOR MANUFACTURING OPERATIONS AND FOR THE TOWN OF RAINELLE. STEAM ENGINE IS A HAMILTON CORLISS. - Meadow River Lumber Company, Highway 60, Rainelle, Greenbrier County, WV

  9. 75 FR 3943 - Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 1 and 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-25

    ... impacts, including the spring 2010 Unit 2 refueling outage and other factors. Environmental Impacts of the... Reading Room on the Internet at the NRC Web site: http://www.nrc.gov/reading-rm/adams.html . Persons who...

  10. Exploiting Identical Generators in Unit Commitment

    DOE PAGES

    Knueven, Ben; Ostrowski, Jim; Watson, Jean -Paul

    2017-12-14

    Here, we present sufficient conditions under which thermal generators can be aggregated in mixed-integer linear programming (MILP) formulations of the unit commitment (UC) problem, while maintaining feasibility and optimality for the original disaggregated problem. Aggregating thermal generators with identical characteristics (e.g., minimum/maximum power output, minimum up/down-time, and cost curves) into a single unit reduces redundancy in the search space induced by both exact symmetry (permutations of generator schedules) and certain classes of mutually non-dominated solutions. We study the impact of aggregation on two large-scale UC instances, one from the academic literature and another based on real-world operator data. Our computationalmore » tests demonstrate that when present, identical generators can negatively affect the performance of modern MILP solvers on UC formulations. Further, we show that our reformation of the UC MILP through aggregation is an effective method for mitigating this source of computational difficulty.« less

  11. Exploiting Identical Generators in Unit Commitment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Knueven, Ben; Ostrowski, Jim; Watson, Jean -Paul

    Here, we present sufficient conditions under which thermal generators can be aggregated in mixed-integer linear programming (MILP) formulations of the unit commitment (UC) problem, while maintaining feasibility and optimality for the original disaggregated problem. Aggregating thermal generators with identical characteristics (e.g., minimum/maximum power output, minimum up/down-time, and cost curves) into a single unit reduces redundancy in the search space induced by both exact symmetry (permutations of generator schedules) and certain classes of mutually non-dominated solutions. We study the impact of aggregation on two large-scale UC instances, one from the academic literature and another based on real-world operator data. Our computationalmore » tests demonstrate that when present, identical generators can negatively affect the performance of modern MILP solvers on UC formulations. Further, we show that our reformation of the UC MILP through aggregation is an effective method for mitigating this source of computational difficulty.« less

  12. The Kepler Science Operations Center Pipeline Framework Extensions

    NASA Technical Reports Server (NTRS)

    Klaus, Todd C.; Cote, Miles T.; McCauliff, Sean; Girouard, Forrest R.; Wohler, Bill; Allen, Christopher; Chandrasekaran, Hema; Bryson, Stephen T.; Middour, Christopher; Caldwell, Douglas A.; hide

    2010-01-01

    The Kepler Science Operations Center (SOC) is responsible for several aspects of the Kepler Mission, including managing targets, generating on-board data compression tables, monitoring photometer health and status, processing the science data, and exporting the pipeline products to the mission archive. We describe how the generic pipeline framework software developed for Kepler is extended to achieve these goals, including pipeline configurations for processing science data and other support roles, and custom unit of work generators that control how the Kepler data are partitioned and distributed across the computing cluster. We describe the interface between the Java software that manages the retrieval and storage of the data for a given unit of work and the MATLAB algorithms that process these data. The data for each unit of work are packaged into a single file that contains everything needed by the science algorithms, allowing these files to be used to debug and evolve the algorithms offline.

  13. Communicating for the Long War: Options for Squadron Commanders

    DTIC Science & Technology

    2009-04-01

    in military operations. In today’s global environment, the opinion of the US public and the world public is essential for the United States to...report emphasized the United States is engaged in a “generational and global struggle about ideas, not a war between the West and Islam.”8 The report...today’s environment of globalization , information and ideas can be transmitted across the world in a matter of seconds. PA operations can use this

  14. 76 FR 26771 - Florida Power & Light Company; Turkey Point, Units 3 and 4; Notice of Consideration of Issuance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-09

    ... Company; Turkey Point, Units 3 and 4; Notice of Consideration of Issuance of Amendment to Facility... issued to Florida Power & Light Co. (the licensee) for operation of the Turkey Point Nuclear Generating... licensed core power level for Turkey Point, Units 3 and 4, from 2300 megawatts thermal (MWt) to 2644 MWt...

  15. 800 Hours of Operational Experience from a 2 kW(sub e) Solar Dynamic System

    NASA Technical Reports Server (NTRS)

    Shaltens, Richard K.; Mason, Lee S.

    1999-01-01

    From December 1994 to September 1998, testing with a 2 kW(sub e) Solar Dynamic power system resulted in 33 individual tests, 886 hours of solar heating, and 783 hours of power generation. Power generation ranged from 400 watts to over 2 kW(sub e), and SD system efficiencies have been measured up to 17 per cent, during simulated low-Earth orbit operation. Further, the turbo-alternator-compressors successfully completed 100 start/stops on foil bearings. Operation was conducted in a large thermal/vacuum facility with a simulated Sun at the NASA Lewis Research Center. The Solar Dynamic system featured a closed Brayton conversion unit integrated with a solar heat receiver, which included thermal energy storage for continuous power output through a typical low-Earth orbit. Two power conversion units and three alternator configurations were used during testing. This paper will review the test program, provide operational and performance data, and review a number of technology issues.

  16. 40 CFR 63.7500 - What emission limitations, work practice standards, and operating limits must I meet?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... pounds per million Btu of steam output, in Tables 1 or 2 to this subpart are an alternative applicable only to boilers and process heaters that generate steam. The output-based emission limits, in units of..., monitoring results, review of operation and maintenance procedures, review of operation and maintenance...

  17. 40 CFR 63.7500 - What emission limitations, work practice standards, and operating limits must I meet?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... pounds per million Btu of steam output, in Tables 1 or 2 to this subpart are an alternative applicable only to boilers and process heaters that generate steam. The output-based emission limits, in units of..., monitoring results, review of operation and maintenance procedures, review of operation and maintenance...

  18. Emerging Definition of Next-Generation of Aeronautical Communications

    NASA Technical Reports Server (NTRS)

    Kerczewski, Robert J.

    2006-01-01

    Aviation continues to experience rapid growth. In regions such as the United States and Europe air traffic congestion is constraining operations, leading to major new efforts to develop methodologies and infrastructures to enable continued aviation growth through transformational air traffic management systems. Such a transformation requires better communications linking airborne and ground-based elements. Technologies for next-generation communications, the required capacities, frequency spectrum of operation, network interconnectivity, and global interoperability are now receiving increased attention. A number of major planning and development efforts have taken place or are in process now to define the transformed airspace of the future. These activities include government and industry led efforts in the United States and Europe, and by international organizations. This paper will review the features, approaches, and activities of several representative planning and development efforts, and identify the emerging global consensus on requirements of next generation aeronautical communications systems for air traffic control.

  19. Swarm based mean-variance mapping optimization (MVMOS) for solving economic dispatch

    NASA Astrophysics Data System (ADS)

    Khoa, T. H.; Vasant, P. M.; Singh, M. S. Balbir; Dieu, V. N.

    2014-10-01

    The economic dispatch (ED) is an essential optimization task in the power generation system. It is defined as the process of allocating the real power output of generation units to meet required load demand so as their total operating cost is minimized while satisfying all physical and operational constraints. This paper introduces a novel optimization which named as Swarm based Mean-variance mapping optimization (MVMOS). The technique is the extension of the original single particle mean-variance mapping optimization (MVMO). Its features make it potentially attractive algorithm for solving optimization problems. The proposed method is implemented for three test power systems, including 3, 13 and 20 thermal generation units with quadratic cost function and the obtained results are compared with many other methods available in the literature. Test results have indicated that the proposed method can efficiently implement for solving economic dispatch.

  20. Control and protection system for an installation for the combined production of electrical and thermal energy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Agazzone, U.; Ausiello, F.P.

    1981-06-23

    A power-generating installation comprises a plurality of modular power plants each comprised of an internal combustion engine connected to an electric machine. The electric machine is used to start the engine and thereafter operates as a generator supplying power to an electrical network common to all the modular plants. The installation has a control and protection system comprising a plurality of control modules each associated with a respective plant, and a central unit passing control signals to the modules to control starting and stopping of the individual power plants. Upon the detection of abnormal operation or failure of its associatedmore » power plant, each control module transmits an alarm signal back to the central unit which thereupon stops, or prevents the starting, of the corresponding power plant. Parameters monitored by each control module include generated current and inter-winding leakage current of the electric machine.« less

  1. 1 ATM subcooled liquid nitrogen cryogenic system with GM-refrigerator for a HTS power transformer

    NASA Astrophysics Data System (ADS)

    Yoshida, S.; Ohashi, K.; Umeno, T.; Suzuki, Y.; Kamioka, Y.; Kimura, H.; Tsutsumi, K.; Iwakuma, M.; Funaki, K.; Bhono, T.; Yagi, Y.

    2002-05-01

    A subcooled liquid nitrogen cryogenic system with GM-refrigerators was developed. The system was operated successfully in a commercial distribution power grid for three consecutive weeks without additional liquid nitrogen supply. The system consists of two main units. One is a HTS transformer unit and the HTS transformer is installed in a G-FRP cryostat. The other one is a pump unit. The pump unit has a liquid nitrogen pump and two GM-refrigerators of 290 W at 64 K for 50 Hz operation in a stainless steel dewar. The refrigerator cold heads are immersed in liquid nitrogen and produce directly subcooled liquid nitrogen in the pump unit. Those two units are connected by transfer-tubes and 1 atmosphere (0.1 MPa) subcooled liquid nitrogen is circulated through the system. In the field test, the refrigerators were operated at 60 Hz and it took 12 hours to cool the transformer down to 70 K and 26 hours to 66 K. The refrigerator cold heads were controlled not to be below 64 K during operation. In spite of a heat generation by the HTS transformer, the subcooled liquid nitrogen temperature in the HTS transformer unit was kept lower than 68 K.

  2. Optical programmable Boolean logic unit.

    PubMed

    Chattopadhyay, Tanay

    2011-11-10

    Logic units are the building blocks of many important computational operations likes arithmetic, multiplexer-demultiplexer, radix conversion, parity checker cum generator, etc. Multifunctional logic operation is very much essential in this respect. Here a programmable Boolean logic unit is proposed that can perform 16 Boolean logical operations from a single optical input according to the programming input without changing the circuit design. This circuit has two outputs. One output is complementary to the other. Hence no loss of data can occur. The circuit is basically designed by a 2×2 polarization independent optical cross bar switch. Performance of the proposed circuit has been achieved by doing numerical simulations. The binary logical states (0,1) are represented by the absence of light (null) and presence of light, respectively.

  3. A Rinsing Effluent Evaporator for Dismantling Operations - 13271

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rives, Rachel; Asou-Pothet, Marielle; Chambon, Frederic

    2013-07-01

    Between 1958 and 1997, the UP1 plant at Marcoule - located in the south of France - reprocessed and recycled nearly 20,000 MT of used fuel from special defense applications reactors, as well as fuel from the first generation of electricity generating reactors in France (natural uranium fuel, CO{sub 2}-cooled, graphite-moderated). Decommissioning and Dismantling of the UP1 plant and its associated units started in 1998. Since 2005, the UP1 facility has been operated by AREVA as the Marcoule Management and Operation contractor for French Atomic Energy Commission (CEA). An important part of this decommissioning program deals with the vitrification facilitymore » of Marcoule. This facility includes 20 tanks devoted to interim storage of highly active solutions, prior to vitrification. In 2006, a rinsing program was defined as part of the tank cleanup strategy. The main objective of the rinsing phases was to decrease activity in order to limit the volume of 'long-life active' waste produced during the decommissioning operations, so the tanks can be dismantled without the need of remote operations. To enable this rinsing program, and anticipating large volumes of generated effluent, the construction of an evaporation unit proved to be essential. The main objective of this unit was to concentrate the effluent produced during tank rinsing operations by a factor of approximately 10, prior to it being treated by vitrification. The evaporator design phase was launched in September 2006. The main challenge for the Project team was the installation of this new unit within a nuclear facility still in operation and in existing compartments not initially designed for this purpose. Cold operating tests were completed in 2008, and in May 2009, the final connections to the process were activated to start the hot test phase. During the first hot test operations performed on the first batches of clean-up effluent, the evaporator had a major operating problem. Extremely large quantities of foam were produced, affecting the evaporator operation, and creating the risk of a reduction in its capacity and throughput performance. A task force of AREVA process, operations, and safety experts from Marcoule and the La Hague reprocessing complex was assembled. New operating parameters were defined and tested to improve the process. Since then, the evaporator has performed very satisfactorily. The foam buildup phenomenon has been brought under complete control. All the different types of effluents produced during cleanup operations have been concentrated, and the results obtained in terms of quality and throughput, have ensured a consistent supply to the vitrification unit. The evaporator was operated until the end of April 2012, and enabled the production of 500 cubic meters of very high activity effluent, concentrating the fission products rinsed from the storage tanks. The evaporator will now be deactivated and decommissioned, with the first rinsing and cleanup operations scheduled to begin in 2014. (authors)« less

  4. ISO New England Dual Fuel Capabilities to Limit Natural Gas and Electricity Interdependencies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adder, Justin M.

    Since 2000, natural gas has seen tremendous growth as a fuel source for electricity generation in the United States (U.S.) with annual installations exceeding 20 GW in all but four years. It also accounts for an increasingly significant share of the nation’s electricity generation, growing from around 15 percent in the early part of the 2000s to between 26 and 29 percent in the last three years. (1) Increasing reliance on natural gas has led to concerns that an extreme weather event – which may cause curtailments in gas delivery – or a natural gas infrastructure failure could lead tomore » local or regional electric reliability issues. (2) These concerns stem from differences in delivery methods of natural gas to electric generating units (EGUs) contrasted with the fuel delivery and storage methods for traditional baseload power systems (i.e. coal and nuclear units).1 (3) Although it seems that there is an abundance of natural gas in a post-shale gas world, infrastructure limitations and differences in electric and natural gas markets persist that differentiate natural gas-fired generators from traditional baseload power generators. Such concerns can be partially mitigated by modifying natural gas EGUs for operation on secondary fuels and installing on-site fuel storage for the secondary fuel, thus ensuring continuity of operation in the case of a gas delivery problem.2 This report examines technical, regulatory, and market issues associated with operating power plants primarily fueled with natural gas, on a secondary fuel, such as fuel oil or liquefied natural gas (LNG). In addition, a regional case study was completed to identify the current and near-term potential for dual fuel operation in New England, along with a market impact analysis of potential cost savings during an extreme weather event. The New England Independent System Operator (ISO-NE) was selected as the study area based on a preponderance of natural gas-fired generators contributing to the regional generating capacity mix (nearly 50 percent natural gas), limited natural gas supply infrastructure, and the potential for natural gas delivery disruptions due to cold weather events, exacerbated by the lack of bulk natural gas storage in the region.« less

  5. International Space Station United States Oxygen Generator Development Testing

    NASA Technical Reports Server (NTRS)

    Erickson, Robert J.; Mason, Richard K.

    2000-01-01

    A life test of a liquid anode feed oxygen generator assembly (OGA) using SPE(R) (United Technologies Corporation, Hamilton Sundstrand Division) membrane technology was terminated in June of 1999. In the total 15,658 hours of operation at MSFC since delivery in 1995, the OGA has produced 2,103 kilograms (kg) (4,632 pounds mass (lbm)) of oxygen, and 263 kg (579 lbm) of hydrogen. Evaluation of cell stack characteristics and oxygen and hydrogen hydrophilic/hydrophobic membrane separators will be discussed.

  6. Hydrogen Generator

    NASA Technical Reports Server (NTRS)

    1978-01-01

    Another spinoff from spacecraft fuel cell technology is the portable hydrogen generator shown. Developed by General Electric Company, it is an aid to safer operation of systems that use hydrogen-for example, gas chromatographs, used in laboratory analysis of gases. or flame ionization detectors used as $ollution monitors. The generator eliminates the need for high-pressure hydrogen storage bottles, which can be a safety hazard, in laboratories, hospitals and industrial plants. The unit supplies high-purity hydrogen by means of an electrochemical process which separates the hydrogen and oxygen in distilled water. The oxygen is vented away and the hydrogen gas is stored within the unit for use as needed. GE's Aircraft Equipment Division is producing about 1,000 of the generators annually.

  7. 75 FR 5070 - TideWorks, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-01

    ... vertical shaft turbine generating unit with four 4-inch-wide, 5-foot-long blades; (3) a new 3.5-foot-wide... generation of about 22,000 kilowatt-hours. The project would operate in a run-of-river mode using the river...

  8. 75 FR 77866 - Agency Information Collection Activities; Submission to OMB for Review and Approval; Comment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-14

    ... Approval; Comment Request; NSPS for Electric Utility Steam Generating (Renewal) AGENCY: Environmental... the electronic docket, go to http://www.regulations.gov . Title: NSPS for Electric Utility Steam.../Affected Entities: Owners or operators of electric utility steam generating units. Estimated Number of...

  9. 75 FR 3497 - Entergy Nuclear Operations, Inc., Entergy Nuclear Indian Point 2, LLC, Entergy Nuclear Indian...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-21

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-247 and 50-286; NRC-2010-0006] Entergy Nuclear Operations, Inc., Entergy Nuclear Indian Point 2, LLC, Entergy Nuclear Indian Point 3, LLC,: Indian Point Nuclear Generating Unit Nos. 2 and 3; Notice of Consideration of Issuance of Amendment to Facility Operating License and Opportunity To Request a...

  10. Modelisation de l'historique d'operation de groupes turbine-alternateur

    NASA Astrophysics Data System (ADS)

    Szczota, Mickael

    Because of their ageing fleet, the utility managers are increasingly in needs of tools that can help them to plan efficiently maintenance operations. Hydro-Quebec started a project that aim to foresee the degradation of their hydroelectric runner, and use that information to classify the generating unit. That classification will help to know which generating unit is more at risk to undergo a major failure. Cracks linked to the fatigue phenomenon are a predominant degradation mode and the loading sequences applied to the runner is a parameter impacting the crack growth. So, the aim of this memoir is to create a generator able to generate synthetic loading sequences that are statistically equivalent to the observed history. Those simulated sequences will be used as input in a life assessment model. At first, we describe how the generating units are operated by Hydro-Quebec and analyse the available data, the analysis shows that the data are non-stationnary. Then, we review modelisation and validation methods. In the following chapter a particular attention is given to a precise description of the validation and comparison procedure. Then, we present the comparison of three kind of model : Discrete Time Markov Chains, Discrete Time Semi-Markov Chains and the Moving Block Bootstrap. For the first two models, we describe how to take account for the non-stationnarity. Finally, we show that the Markov Chain is not adapted for our case, and that the Semi-Markov chains are better when they include the non-stationnarity. The final choice between Semi-Markov Chains and the Moving Block Bootstrap depends of the user. But, with a long term vision we recommend the use of Semi-Markov chains for their flexibility. Keywords: Stochastic models, Models validation, Reliability, Semi-Markov Chains, Markov Chains, Bootstrap

  11. Modeling of unit operating considerations in generating-capacity reliability evaluation. Volume 2. Computer-program documentation. Final report. [GENESIS, OPCON and OPPLAN

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patton, A.D.; Ayoub, A.K.; Singh, C.

    1982-07-01

    This report describes the structure and operation of prototype computer programs developed for a Monte Carlo simulation model, GENESIS, and for two analytical models, OPCON and OPPLAN. It includes input data requirements and sample test cases.

  12. Ground Radio Operator Career Ladder AFSC 293X3.

    DTIC Science & Technology

    1981-07-01

    formal resident training, OJT, and ,her Air Force management decisions . The structure of jobs within the Ground ! odio Operatoi career ladder was...33 ADJUST ANTENNA TUNING UNITS 33 TYPE RECORDS, REPORTS, OR FORMS :33 OPERATE AUXILLARY GENERATORS 33 A8 ’iT’ TASKS PERFORMED BY SUPERVISORS AND

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Townsend, M.W.

    The Monsanto Chemical Company operates a plastics and resins plant located in Addyston, Ohio. The process equipment requires routine rinsing with technical grade acetone between batches. Due to the volumes of spent acetone generated and the associated RCRA hazardous waste regulations, the plant sought to recycle and reuse the acetone to reduce the purchase cost of virgin acetone and the cost of spent acetone disposal. One of the first options explored was package unit distillation units. The cost of these units was in the $20--$30,000 range in 1989 dollars. Even though the cost of a package unit was not deemedmore » unreasonable, there were additional costs and concerns that led to elimination of this option. The unit would have required additional manpower to operate and maintain, i.e., at least a fraction of an operator and mechanic. For plant safety reasons, it was desired to operate this package unit outside the production building, thus construction of an outbuilding would have added to the expense of the project. Additionally, there were concerns of package unit reliability. During this evaluation, tractor-trailer mounted distillation units were discovered. The portable units were equipped with either thin-film evaporator technology capable of processing 240 to 480 gallons per hour, or pot still (batch) distillation technology capable of rates from 120 to 240 gallons per hour. Both units were constructed of stainless steel.« less

  14. Low-grade geothermal energy conversion by organic Rankine cycle turbine generator

    NASA Astrophysics Data System (ADS)

    Zarling, J. P.; Aspnes, J. D.

    Results of a demonstration project which helped determine the feasibility of converting low-grade thermal energy in 49 C water into electrical energy via an organic Rankine cycle 2500 watt (electrical) turbine-generator are presented. The geothermal source which supplied the water is located in a rural Alaskan village. The reasons an organic Rankine cycle turbine-generator was investigated as a possible source of electric power in rural Alaska are: (1) high cost of operating diesel-electric units and their poor long-term reliability when high-quality maintenance is unavailable and (2) the extremely high level of long-term reliability reportedly attained by commercially available organic Rankine cycle turbines. Data is provided on the thermal and electrical operating characteristics of an experimental organic Rankine cycle turbine-generator operating at a uniquely low vaporizer temperature.

  15. Electrical generating unit inventory, 1976-1986: Illinois, Indiana, Kentucky, Ohio, Pennsylvania and West Virginia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jansen, S.D.

    1981-09-01

    The report was prepared as part of the Ohio River Basin Energy Study (ORBES), a multidisciplinary policy research program. The ORBES region consists of all of Kentucky, most of West Virginia, substantial parts of Illinois, Indiana, and Ohio, and southwestern Pennsylvania. The inventory lists installed electrical generating capacity in commercial service as of December 1, 1976, and scheduled capacity additions and removals between 1977 and 1986 in the six ORBES states (Illinois, Indiana, Kentucky, Ohio, Pennsylvania, and West Virginia). The following information is included for each electrical generating unit: unit ID code, company index, whether joint or industrial ownership, plantmore » name, whether inside or outside the ORBES region, FIPS county code, type of unit, size in megawatts, type of megawatt rating, status of unit, date of commercial operation (actual or scheduled), scheduled retirement date (if any), primary fuel, alternate fuel, type of cooling, source of cooling water, and source of information.« less

  16. Ground Software Maintenance Facility (GSMF) user's manual. Appendices NASA-CR-178806 NAS 1.26:178806 Rept-41849-G159-026-App HC A05/MF A01

    NASA Technical Reports Server (NTRS)

    Aquila, V.; Derrig, D.; Griffith, G.

    1986-01-01

    Procedures are presented that allow the user to assemble tasks, link, compile, backup the system, generate/establish/print display pages, cancel tasks in memory, and to TET an assembly task without having to enter the commands every time. A list of acronyms is provided. Software identification, payload checkout unit operating system services, data base generation, and MITRA operating procedures are also discussed.

  17. Propellant Analysis and Distillation Unit Design

    NASA Technical Reports Server (NTRS)

    Barragan, Michelle H.; Spangler, Cindy; Barrera, Louis K.

    2007-01-01

    The NASA White Sands Test Facility (WSTF) routinely operates hypergolic propulsion systems. Some of the onsite activities include performing long duration studies on the operational life of these systems. A few of them have been in use for over twenty years. During this span of time contamination has built up in the propellant and some of the distribution infrastructure. This study investigated the nature of this contamination, the pathology of its generation, and developed a process for removal of the contamination that was cost efficient with minimal waste generation.

  18. Optimal Operation of Energy Storage in Power Transmission and Distribution

    NASA Astrophysics Data System (ADS)

    Akhavan Hejazi, Seyed Hossein

    In this thesis, we investigate optimal operation of energy storage units in power transmission and distribution grids. At transmission level, we investigate the problem where an investor-owned independently-operated energy storage system seeks to offer energy and ancillary services in the day-ahead and real-time markets. We specifically consider the case where a significant portion of the power generated in the grid is from renewable energy resources and there exists significant uncertainty in system operation. In this regard, we formulate a stochastic programming framework to choose optimal energy and reserve bids for the storage units that takes into account the fluctuating nature of the market prices due to the randomness in the renewable power generation availability. At distribution level, we develop a comprehensive data set to model various stochastic factors on power distribution networks, with focus on networks that have high penetration of electric vehicle charging load and distributed renewable generation. Furthermore, we develop a data-driven stochastic model for energy storage operation at distribution level, where the distribution of nodal voltage and line power flow are modelled as stochastic functions of the energy storage unit's charge and discharge schedules. In particular, we develop new closed-form stochastic models for such key operational parameters in the system. Our approach is analytical and allows formulating tractable optimization problems. Yet, it does not involve any restricting assumption on the distribution of random parameters, hence, it results in accurate modeling of uncertainties. By considering the specific characteristics of random variables, such as their statistical dependencies and often irregularly-shaped probability distributions, we propose a non-parametric chance-constrained optimization approach to operate and plan energy storage units in power distribution girds. In the proposed stochastic optimization, we consider uncertainty from various elements, such as solar photovoltaic , electric vehicle chargers, and residential baseloads, in the form of discrete probability functions. In the last part of this thesis we address some other resources and concepts for enhancing the operation of power distribution and transmission systems. In particular, we proposed a new framework to determine the best sites, sizes, and optimal payment incentives under special contracts for committed-type DG projects to offset distribution network investment costs. In this framework, the aim is to allocate DGs such that the profit gained by the distribution company is maximized while each DG unit's individual profit is also taken into account to assure that private DG investment remains economical.

  19. Online Optimization Method for Operation of Generators in a Micro Grid

    NASA Astrophysics Data System (ADS)

    Hayashi, Yasuhiro; Miyamoto, Hideki; Matsuki, Junya; Iizuka, Toshio; Azuma, Hitoshi

    Recently a lot of studies and developments about distributed generator such as photovoltaic generation system, wind turbine generation system and fuel cell have been performed under the background of the global environment issues and deregulation of the electricity market, and the technique of these distributed generators have progressed. Especially, micro grid which consists of several distributed generators, loads and storage battery is expected as one of the new operation system of distributed generator. However, since precipitous load fluctuation occurs in micro grid for the reason of its smaller capacity compared with conventional power system, high-accuracy load forecasting and control scheme to balance of supply and demand are needed. Namely, it is necessary to improve the precision of operation in micro grid by observing load fluctuation and correcting start-stop schedule and output of generators online. But it is not easy to determine the operation schedule of each generator in short time, because the problem to determine start-up, shut-down and output of each generator in micro grid is a mixed integer programming problem. In this paper, the authors propose an online optimization method for the optimal operation schedule of generators in micro grid. The proposed method is based on enumeration method and particle swarm optimization (PSO). In the proposed method, after picking up all unit commitment patterns of each generators satisfied with minimum up time and minimum down time constraint by using enumeration method, optimal schedule and output of generators are determined under the other operational constraints by using PSO. Numerical simulation is carried out for a micro grid model with five generators and photovoltaic generation system in order to examine the validity of the proposed method.

  20. Method for encryption and transmission of digital keying data

    DOEpatents

    Mniszewski, Susan M.; Springer, Edward A.; Brenner, David P.

    1988-01-01

    A method for the encryption, transmission, and subsequent decryption of digital keying data. The method utilizes the Data Encryption Standard and is implemented by means of a pair of apparatus, each of which is selectable to operate as either a master unit or remote unit. Each unit contains a set of key encryption keys which are indexed by a common indexing system. The master unit operates upon command from the remote unit to generate a data encryption key and encrypt the data encryption key using a preselected key encryption key. The encrypted data encryption key and an index designator are then downloaded to the remote unit, where the data encryption key is decrypted for subsequent use in the encryption and transmission data. Downloading of the encrypted data encryption key enables frequent change of keys without requiring manual entry or storage of keys at the remote unit.

  1. 77 FR 46185 - United States v. United Technologies Corporation and Goodrich Corporation; Proposed Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-02

    ... for generating power for all the in-flight systems that run on electricity, including pumping breathable air into the fuselage, operating the lights, and running the navigation and communication... turning a propeller blade on a turboprop engine, a rotor shaft on a turboshaft engine, or a fan in front...

  2. 40 CFR 52.145 - Visibility protection.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... paragraph is applicable to the fossil fuel-fired, steam-generating equipment designated as Units 1, 2, and 3... applicable. Unit-Week of Maintenance means a period of 7 days during which a fossil fuel-fired steam... operator shall discharge or cause the discharge of sulfur oxides into the atmosphere in excess of 42 ng/J...

  3. 40 CFR 52.145 - Visibility protection.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... paragraph is applicable to the fossil fuel-fired, steam-generating equipment designated as Units 1, 2, and 3... applicable. Unit-Week of Maintenance means a period of 7 days during which a fossil fuel-fired steam... operator shall discharge or cause the discharge of sulfur oxides into the atmosphere in excess of 42 ng/J...

  4. Conducting water chemistry of the secondary coolant circuit of VVER-based nuclear power plant units constructed without using copper containing alloys

    NASA Astrophysics Data System (ADS)

    Tyapkov, V. F.

    2014-07-01

    The secondary coolant circuit water chemistry with metering amines began to be put in use in Russia in 2005, and all nuclear power plant units equipped with VVER-1000 reactors have been shifted to operate with this water chemistry for the past seven years. Owing to the use of water chemistry with metering amines, the amount of products from corrosion of structural materials entering into the volume of steam generators has been reduced, and the flow-accelerated corrosion rate of pipelines and equipment has been slowed down. The article presents data on conducting water chemistry in nuclear power plant units with VVER-1000 reactors for the secondary coolant system equipment made without using copper-containing alloys. Statistical data are presented on conducting ammonia-morpholine and ammonia-ethanolamine water chemistries in new-generation operating power units with VVER-1000 reactors with an increased level of pH. The values of cooling water leaks in turbine condensers the tube system of which is made of stainless steel or titanium alloy are given.

  5. Turbine sizing of a solar thermal power plant

    NASA Technical Reports Server (NTRS)

    Manvi, R.; Fujita, T.

    1979-01-01

    Since the insolation is intermittent, thermal energy storage is necessary to extend the time of power generation with solar heat past sunset. There are two approaches to specifying the size of turbine-generator units depending on the system operation. In the first approach, the turbine operates at its full capacity when operating on direct solar heat, and at reduced capacity when operating on collected heat out of energy storage. In the second approach, the turbine will always operate at a uniform level either on derated energy from the receiver or from energy storage. Both of these approaches have certain advantages and disadvantages. In this paper, a simple analysis is outlined and exercised to compare the performance and economics of these two approaches.

  6. Optimization of a stand-alone Solar PV-Wind-DG Hybrid System for Distributed Power Generation at Sagar Island

    NASA Astrophysics Data System (ADS)

    Roy, P. C.; Majumder, A.; Chakraborty, N.

    2010-10-01

    An estimation of a stand-alone solar PV and wind hybrid system for distributed power generation has been made based on the resources available at Sagar island, a remote area distant to grid operation. Optimization and sensitivity analysis has been made to evaluate the feasibility and size of the power generation unit. A comparison of the different modes of hybrid system has been studied. It has been estimated that Solar PV-Wind-DG hybrid system provides lesser per unit electricity cost. Capital investment is observed to be lesser when the system run with Wind-DG compared to Solar PV-DG.

  7. Operational procedure for computer program for design point characteristics of a compressed-air generator with through-flow combustor for V/STOL applications

    NASA Technical Reports Server (NTRS)

    Krebs, R. P.

    1971-01-01

    The computer program described in this report calculates the design-point characteristics of a compressed-air generator for use in V/STOL applications such as systems with a tip-turbine-driven lift fan. The program computes the dimensions and mass, as well as the thermodynamic performance of a model air generator configuration which involves a straight through-flow combustor. Physical and thermodynamic characteristics of the air generator components are also given. The program was written in FORTRAN IV language. Provision has been made so that the program will accept input values in either SI units or U.S. customary units. Each air generator design-point calculation requires about 1.5 seconds of 7094 computer time for execution.

  8. AUTOMOTIVE DIESEL MAINTENANCE 2. UNIT XVIII, ALTERNATOR AND REGULATOR SERVICING AND TESTING, AND AN INTRODUCTION TO TRANSISTOR REGULATORS.

    ERIC Educational Resources Information Center

    Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.

    THIS MODULE OF A 25-MODULE COURSE IS DESIGNED AS A REVIEW OF THE OPERATING PRINCIPLES AND SERVICING PROCEDURES FOR GENERATORS AND AS AN INTRODUCTION TO TRANSISTOR CONTROLLED VOLTAGE REGULATION FOR GENERATORS USED ON DIESEL POWERED EQUIPMENT. TOPICS ARE (1) REVIEW OF GENERATOR PRINCIPLES, AC AND DC, (2) SERVICING AND TESTING ALTERNATORS, AND (3)…

  9. Design study of wind turbines 50 kW to 3000 kW for electric utility applications. Volume 1: Summary report

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Wind turbine configurations that would lead to generation of electrical power in a cost effective manner were considered. All possible overall system configurationss, operating modes, and sybsystem concepts were evaluated for both technical feasibility and compatibility with utility networks, as well as for economic attractiveness. A design optimization computer code was developed to determine the cost sensitivity of the various design features, and thus establish the configuration and design conditions that would minimize the generated energy costs. The preliminary designs of both a 500 kW unit and a 1500 kW unit operating in a 12 mph and 18 mph median wind speed respectively, were developed. The rationale employed and the key findings are summarized.

  10. 2007 SB14 Source Reduction Plan/Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chang, L

    2007-07-24

    Aqueous solutions (mixed waste) generated from various LLNL operations, such as debris washing, sample preparation and analysis, and equipment maintenance and cleanout, were combined for storage in the B695 tank farm. Prior to combination the individual waste streams had different codes depending on the particular generating process and waste characteristics. The largest streams were CWC 132, 791, 134, 792. Several smaller waste streams were also included. This combined waste stream was treated at LLNL's waste treatment facility using a vacuum filtration and cool vapor evaporation process in preparation for discharge to sanitary sewer. Prior to discharge, the treated waste streammore » was sampled and the results were reviewed by LLNL's water monitoring specialists. The treated solution was discharged following confirmation that it met the discharge criteria. A major source, accounting for 50% for this waste stream, is metal machining, cutting and grinding operations in the engineering machine shops in B321/B131. An additional 7% was from similar operations in B131 and B132S. This waste stream primarily contains metal cuttings from machined parts, machining coolant and water, with small amounts of tramp oil from the machining and grinding equipment. Several waste reduction measures for the B321 machine shop have been taken, including the use of a small point-of-use filtering/tramp-oil coalescing/UV-sterilization coolant recycling unit, and improved management techniques (testing and replenishing) for coolants. The recycling unit had some operational problems during 2006. The machine shop is planning to have it repaired in the near future. A major source, accounting for 50% for this waste stream, is metal machining, cutting and grinding operations in the engineering machine shops in B321/B131. An additional 7% was from similar operations in B131 and B132S. This waste stream primarily contains metal cuttings from machined parts, machining coolant and water, with small amounts of tramp oil from the machining and grinding equipment. Several waste reduction measures for the B321 machine shop have been taken, including the use of a small point-of-use filtering/tramp-oil coalescing/UV-sterilization coolant recycling unit, and improved management techniques (testing and replenishing) for coolants. The recycling unit had some operational problems during 2006. The machine shop is planning to have it repaired in the near future. Quarterly waste generation data prepared by the Environmental Protection Department's P2 Team are regularly provided to engineering shops as well as other facilities so that generators can track the effectiveness of their waste minimization efforts.« less

  11. An Isotope-Powered Thermal Storage unit for space applications

    NASA Technical Reports Server (NTRS)

    Lisano, Michael E.; Rose, M. F.

    1991-01-01

    An Isotope-Powered Thermal Storage Unit (ITSU), that would store and utilize heat energy in a 'pulsed' fashion in space operations, is described. Properties of various radioisotopes are considered in conjunction with characteristics of thermal energy storage materials, to evaluate possible implementation of such a device. The utility of the unit is discussed in light of various space applications, including rocket propulsion, power generation, and spacecraft thermal management.

  12. 47 CFR 11.34 - Acceptability of the equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) Equipment Requirements § 11.34 Acceptability of the equipment. (a) An EAS Encoder used for generating the...) The functions of the EAS decoder, Attention Signal generator and receiver, and the EAS encoder... information on how to install, operate and program an EAS Encoder, EAS Decoder, or combined unit and a list of...

  13. 47 CFR 11.34 - Acceptability of the equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Equipment Requirements § 11.34 Acceptability of the equipment. (a) An EAS Encoder used for generating the...) The functions of the EAS decoder, Attention Signal generator and receiver, and the EAS encoder... information on how to install, operate and program an EAS Encoder, EAS Decoder, or combined unit and a list of...

  14. AUTOMOTIVE DIESEL MAINTENANCE 2. UNIT XVII, LEARNING ABOUT AC GENERATOR (ALTERNATOR) PRINCIPLES (PART II).

    ERIC Educational Resources Information Center

    Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.

    THIS MODULE OF A 25-MODULE COURSE IS DESIGNED TO DEVELOP AN UNDERSTANDING OF THE OPERATING PRINCIPLES AND THE SERVICING AND TESTING PROCEDURES FOR ALTERNATING CURRENT (AC) GENERATORS AND REGULATORS USED ON DIESEL POWERED EQUIPMENT. TOPICS ARE REVIEW OF ALTERNATOR PRINCIPLES, ALTERNATOR SERVICING AND TESTING, ALTERNATOR REGULATOR OPERATING…

  15. 76 FR 11521 - Prairie Island Nuclear Generating Plant, Unit 1, Northern States Power Company-Minnesota; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ..., Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001..., Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation. [FR Doc. 2011-4557 Filed 3-1... NUCLEAR REGULATORY COMMISSION [Docket No. 50-282; NRC-2011-0040] Prairie Island Nuclear Generating...

  16. Mobile dental operations: capital budgeting and long-term viability.

    PubMed

    Arevalo, Oscar; Chattopadhyay, Amit; Lester, Harold; Skelton, Judy

    2010-01-01

    The University of Kentucky College of Dentistry (UKCD) runs a large mobile dental operation. Economic conditions dictate that as the mobile units age it will be harder to find donors willing or able to provide the financial resources for asset replacement. In order to maintain current levels of access for the underserved, consideration of replacement is paramount. A financial analysis for a new mobile unit was conducted to determine self-sustainability, return on investment (ROI), and feasibility of generating a cash reserve for its replacement in 12 years. Information on clinical income, operational and replacement costs, and capital costs was collected. A capital budgeting analysis (CBA) was conducted using the Net Present Value (NPV) methodology in four different scenarios. Depreciation funding was calculated by transferring funds from cash inflows and reinvested to offset depreciation at fixed compound interest. A positive ROI was obtained for two scenarios. He depreciation fund did not generate a cash reserve sufficient to replace the mobile unit. Mobile dental programs can play a vital role in providing access to care to underserved populations and ensuring their mission requires long-term planning. Careful financial viability and CBA based on sound assumptions are excellent decision-making tools.

  17. Application of CFB technology for large power generating units and CO{sub 2} capture

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ryabov, G. A., E-mail: georgy.ryabov@gmail.com; Folomeev, O. M.; Sankin, D. A.

    2010-07-15

    Data on the development of the circulating fluidized bed (CFB) technology for combustion of fuels in large power generating units are examined. The problems with raising the steam parameters and unit power of boilers with a circulating fluidized bed are examined. With the boiler system at the 460 MW unit at Lagisza (Poland) as an example, the feasibility of raising the efficiency of units with CFB boilers through deep recovery of the heat of the effluent gases and reducing expenditure for in-house needs is demonstrated. Comparative estimates of the capital and operating costs of 225 and 330 MW units aremore » used to determine the conditions for optimum use of CFB boilers in the engineering renovation of thermal power plants in Russia. New areas for the application of CFB technology in CO{sub 2} capture are analyzed in connection with the problem of reducing greenhouse gas emissions.« less

  18. Pulsed thermionic converter study

    NASA Technical Reports Server (NTRS)

    1976-01-01

    A nuclear electric propulsion concept using a thermionic reactor inductively coupled to a magnetoplasmadynamic accelerator (MPD arc jet) is described, and the results of preliminary analyses are presented. In this system, the MPD thruster operates intermittently at higher voltages and power levels than the thermionic generating unit. A typical thrust pulse from the MPD arc jet is characterized by power levels of 1 to 4 MWe, a duration of 1 msec, and a duty cycle of approximately 20%. The thermionic generating unit operates continuously but with a lower power level of approximately 0.4 MWe. Energy storage between thrust pulses is provided by building up a large current in an inductor using the output of the thermionic converter array. Periodically, the charging current is interrupted, and the energy stored in the magnetic field of the inductor is utilized for a short duration thrust pulse. The results of the preliminary analysis show that a coupling effectiveness of approximately 85 to 90% is feasible for a nominal 400 KWe system with an inductive unit suitable for a flight vehicle.

  19. Design study of wind turbines 50 kW to 3000 kW for electric utility applications. Volume 2: Analysis and design

    NASA Technical Reports Server (NTRS)

    1976-01-01

    All possible overall system configurations, operating modes, and subsystem concepts for a wind turbine configuration for cost effective generation of electrical power were evaluated for both technical feasibility and compatibility with utility networks, as well as for economic attractiveness. A design optimization computer code was developed to determine the cost sensitivity of the various design features, and thus establish the configuration and design conditions that would minimize the generated energy costs. The preliminary designs of both a 500 kW unit and a 1500 kW unit operating in a 12 mph and 18 mph median wind speed respectively, were developed. The various design features and components evaluated are described, and the rationale employed to select the final design configuration is given. All pertinent technical performance data and component cost data is included. The costs of all major subassemblies are estimated and the resultant energy costs for both the 500 kW and 1500 kW units are calculated.

  20. 75 FR 67784 - STP Nuclear Operating Company South Texas Project Electric Generating Station, Units 3 and 4...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-03

    .... Mitigation measures, such as operational controls and practices, worker training, use of personal protective... equipment emissions, and fugitive dust caused by earth-moving activities. As stated in the ER for the COL... fugitive dust and vehicle and equipment emissions, including water suppression, covering truck loads and...

  1. 77 FR 70847 - Entergy Nuclear Indian Point 2, LLC; Entergy Nuclear Operations, Inc., Indian Point Nuclear...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-27

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-247; NRC-2012-0284] Entergy Nuclear Indian Point 2, LLC; Entergy Nuclear Operations, Inc., Indian Point Nuclear Generating Unit No. 2, Request for Action AGENCY: Nuclear Regulatory Commission. ACTION: Request for Action; receipt. SUMMARY: The U.S. Nuclear...

  2. 78 FR 77726 - Exelon Generation Company, LLC Three Mile Island Nuclear Station, Unit 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-24

    [email protected] . NRC's Agencywide Documents Access and Management System (ADAMS): You may access publicly... safety during any condition of normal operation, including anticipated operational occurrences and system... for exemption is based on the use of the 1997 and 2002, editions of American Society for Testing and...

  3. KSC-08pd1650

    NASA Image and Video Library

    2008-06-10

    CAPE CANAVERAL, Fla. – Auxiliary power unit 3, or APU3, is ready for installation in space shuttle Endeavour for the STS-126 mission. The auxiliary power unit is a hydrazine-fueled, turbine-driven power unit that generates mechanical shaft power to drive a hydraulic pump that produces pressure for the orbiter's hydraulic system. There are three separate APUs, three hydraulic pumps and three hydraulic systems, located in the aft fuselage of the orbiter. When the three auxiliary power units are started five minutes before lift-off, the hydraulic systems are used to position the three main engines for activation, control various propellant valves on the engines and position orbiter aerosurfaces. The auxiliary power units are not operated after the first orbital maneuvering system thrusting period because hydraulic power is no longer required. One power unit is operated briefly one day before deorbit to support checkout of the orbiter flight control system. One auxiliary power unit is restarted before the deorbit thrusting period. The two remaining units are started after the deorbit thrusting maneuver and operate continuously through entry, landing and landing rollout. On STS-126, Endeavour will deliver a multi-purpose logistics module to the International Space Station. Launch is targeted for Nov. 10. Photo credit: NASA/Kim Shiflett

  4. Bulk energy storage increases United States electricity system emissions.

    PubMed

    Hittinger, Eric S; Azevedo, Inês M L

    2015-03-03

    Bulk energy storage is generally considered an important contributor for the transition toward a more flexible and sustainable electricity system. Although economically valuable, storage is not fundamentally a "green" technology, leading to reductions in emissions. We model the economic and emissions effects of bulk energy storage providing an energy arbitrage service. We calculate the profits under two scenarios (perfect and imperfect information about future electricity prices), and estimate the effect of bulk storage on net emissions of CO2, SO2, and NOx for 20 eGRID subregions in the United States. We find that net system CO2 emissions resulting from storage operation are nontrivial when compared to the emissions from electricity generation, ranging from 104 to 407 kg/MWh of delivered energy depending on location, storage operation mode, and assumptions regarding carbon intensity. Net NOx emissions range from -0.16 (i.e., producing net savings) to 0.49 kg/MWh, and are generally small when compared to average generation-related emissions. Net SO2 emissions from storage operation range from -0.01 to 1.7 kg/MWh, depending on location and storage operation mode.

  5. MATS E-Reporting Final Action

    EPA Pesticide Factsheets

    This page describes the interim final rule that will allow owners or operators of electric generating units to submit to EPA electronic emissions and compliance reports for the Mercury and Air Toxics rule.

  6. Stochastic Multi-Timescale Power System Operations With Variable Wind Generation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wu, Hongyu; Krad, Ibrahim; Florita, Anthony

    This paper describes a novel set of stochastic unit commitment and economic dispatch models that consider stochastic loads and variable generation at multiple operational timescales. The stochastic model includes four distinct stages: stochastic day-ahead security-constrained unit commitment (SCUC), stochastic real-time SCUC, stochastic real-time security-constrained economic dispatch (SCED), and deterministic automatic generation control (AGC). These sub-models are integrated together such that they are continually updated with decisions passed from one to another. The progressive hedging algorithm (PHA) is applied to solve the stochastic models to maintain the computational tractability of the proposed models. Comparative case studies with deterministic approaches are conductedmore » in low wind and high wind penetration scenarios to highlight the advantages of the proposed methodology, one with perfect forecasts and the other with current state-of-the-art but imperfect deterministic forecasts. The effectiveness of the proposed method is evaluated with sensitivity tests using both economic and reliability metrics to provide a broader view of its impact.« less

  7. 40 CFR 63.10011 - How do I demonstrate initial compliance with the emissions limits and work practice standards?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Hazardous Air Pollutants: Coal- and Oil-Fired Electric Utility Steam Generating Units Testing and Initial... liquid oil-fired unit, and you use quarterly stack testing for HCl and HF plus site-specific parameter monitoring to demonstrate continuous performance, you must also establish a site-specific operating limit, in...

  8. 40 CFR 63.10011 - How do I demonstrate initial compliance with the emissions limits and work practice standards?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Hazardous Air Pollutants: Coal- and Oil-Fired Electric Utility Steam Generating Units Testing and Initial... liquid oil-fired unit, and you use quarterly stack testing for HCl and HF plus site-specific parameter monitoring to demonstrate continuous performance, you must also establish a site-specific operating limit, in...

  9. 40 CFR 60.4176 - Additional requirements to provide heat input data.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Additional requirements to provide heat... Compliance Times for Coal-Fired Electric Steam Generating Units Monitoring and Reporting § 60.4176 Additional requirements to provide heat input data. The owner or operator of a Hg Budget unit that monitors and reports Hg...

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 60%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to grow by about 24% from 2013 to 2040 . At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license, for a total of 60 years of operation (the oldest commercial plants in the Unitedmore » States reached their 40th anniversary in 2009). Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity for 40- and 60-year license periods. If current operating nuclear power plants do not operate beyond 60 years (and new nuclear plants are not built quickly enough to replace them), the total fraction of generated electrical energy from nuclear power will rapidly decline. That decline will be accelerated if plants are shut down before 60 years of operation. Decisions on extended operation ultimately rely on economic factors; however, economics can often be improved through technical advancements. The U.S. Department of Energy Office of Nuclear Energy's 2010 Research and Development Roadmap (2010 Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: 1. Develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; 2. Develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration's energy security and climate change goals; 3. Develop sustainable nuclear fuel cycles; and 4. Understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program's plans. For the LWRS Program, sustainability is defined as the ability to maintain safe and economic operation of the existing fleet of nuclear power plants for a longer-than-initially-licensed lifetime. It has two facets with respect to long-term operations: (1) manage the aging of plant systems, structures, and components so that nuclear power plant lifetimes can be extended and the plants can continue to operate safely, efficiently, and economically; and (2) provide science-based solutions to the industry to implement technology to exceed the performance of the current labor-intensive business model.« less

  11. Steam generator feedwater nozzle transition piece replacement experience at Salem Unit 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patten, D.B.; Perrin, J.S.; Roberts, A.T.

    Cracking of steam generator feedwater piping adjacent to the feedwater nozzles has been a recurring problem since 1979 at Salem Unit 1 owned and operated by Public Service Electric and Gas Company. In addition to the cracking problem, erosion-corrosion at the leading edge of the feedwater nozzle thermal sleeve was also observed in 1992. To provide a long-term solution for the pipe cracking and thermal sleeve erosion-corrosion problems, a unique transition piece forging was specially designed, fabricated, and installed for each of the four steam generators during the 1995 outage. This paper discusses the design, fabrication, and installation of themore » transition piece forgings at Salem Unit 1, and the experiences gained from this project. It is believed that these experiences may help other utilities when planning similar replacements in the future.« less

  12. An Operations Concept for the Next Generation VLA

    NASA Astrophysics Data System (ADS)

    Kepley, Amanda; McKinnon, Mark; Selina, Rob; Murphy, Eric Joseph; ngVLA project

    2018-01-01

    This poster presents an operations plan for the next generation VLA (ngVLA), which is a proposed 214 element interferometer operating from ~1-115GHz, located in the southwestern United States. The operations requirements for this instrument are driven by the large number of antennas spread out over a multi-state area and a cap on the operations budget of 3 times that of the current VLA. These constraints require that the maintenance is a continuous process and that individual antennas are self-sufficient, making flexible subarrays crucial. The ngVLA will produce science ready data products for its users, building on the pioneering work being currently done at ALMA and the JVLA. Finally, the ngVLA will adopt a user support model similar to those at other large facilities (ALMA, HST, JWST, etc).

  13. Dispersed solar thermal generation employing parabolic dish-electric transport with field modulated generator systems

    NASA Technical Reports Server (NTRS)

    Ramakumar, R.; Bahrami, K.

    1981-01-01

    This paper discusses the application of field modulated generator systems (FMGS) to dispersed solar-thermal-electric generation from a parabolic dish field with electric transport. Each solar generation unit is rated at 15 kWe and the power generated by an array of such units is electrically collected for insertion into an existing utility grid. Such an approach appears to be most suitable when the heat engine rotational speeds are high (greater than 6000 r/min) and, in particular, if they are operated in the variable speed mode and if utility-grade a.c. is required for direct insertion into the grid without an intermediate electric energy storage and reconversion system. Predictions of overall efficiencies based on conservative efficiency figures for the FMGS are in the range of 25 per cent and should be encouraging to those involved in the development of cost-effective dispersed solar thermal power systems.

  14. Role of Pumped Storage Hydro Resources in Electricity Markets and System Operation: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ela, E.; Kirby, B.; Botterud, A.

    2013-05-01

    The most common form of utility- sized energy storage system is the pumped storage hydro system. Originally, these types of storage systems were economically viable simply because they displace more expensive generating units. However, over time, as those expensive units became more efficient and costs declined, pumped hydro storage units no longer have the operational edge. As a result, in the current electricity market environment, pumped storage hydro plants are struggling. To offset this phenomenon, certain market modifications should be addressed. This paper will introduce some of the challenges faced by pumped storage hydro plants in today's markets and purposemore » some solutions to those problems.« less

  15. 75 FR 5357 - In the Matter of Entergy Nuclear Operations, Inc., et al.; Order Extending the Effectiveness of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-02

    ...). Pilgrim is a boiling water nuclear reactor that is owned by Entergy Nuclear and operated by ENO. The... Generating Unit No. 1 (IP1). IP1 is a pressurized water nuclear reactor that is owned by ENIP2 and maintained... nuclear reactors that are owned by ENIP2 and ENIP3, respectively, and operated by ENO. The facilities are...

  16. Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taddeucci, Joe

    2013-03-29

    The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Betweenmore » 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a double nozzle Pelton turbine with a 10-to-1 flow turndown and a maximum turbine/generator efficiency of 88%. This alone represents a 6% increase in overall efficiency. The old turbine operated at low efficiencies due to age and non-optimal sizing of the turbine for the water flow available to the unit. It was shut down whenever water flow dropped to less than 4-5 cfs, and at that flow, efficiency was 55 to 60%. The new turbine will operate in the range of 70 to 88% efficiency through a large portion of the existing flow range and would only have to be shut down at flow rates less than 3.7 cfs. Efficiency is expected to increase by 15-30%, depending on flow. In addition to the installation of new equipment, other goals for the project included: Increasing safety at Boulder Canyon Hydro Increasing protection of the Boulder Creek environment Modernizing and integrating control equipment into Boulder's municipal water supply system, and Preserving significant historical engineering information prior to power plant modernization. From January 1, 2010 through December 31, 2012, combined consultant and contractor personnel hours paid for by both the city and the federal government have totaled approximately 40,000. This equates roughly to seven people working full time on the project from January 2010 through December 2012. This project also involved considerable material expense (steel pipe, a variety of valves, electrical equipment, and the various components of the turbine and generator), which were not accounted for in terms of hours spent on the project. However, the material expense related to this project did help to create or preserve manufacturing/industrial jobs throughout the United States. As required by ARRA, the various components of the hydroelectric project were manufactured or substantially transformed in the U.S. BCH is eligible for nomination to the National Register of Historic Places due in part to its unique engineering features and innovative construction techniques. Special efforts were directed toward documenting the (largely original) interior of the plant and installing new equipment without modifying the power plant exterior in order to preserve the historical significance of the facility. In addition, a significant portion of the historical equipment within the power plant was preserved in place. The modernization project began with DOE grant award on January 1, 2010, and the project was completed on December 31, 2012. In addition to city engineering and hydroelectric staff, major project participants included AECOM (design/engineering) Canyon Industries (turbine/generator manufacture), Gracon Corporation (general construction contractor), Exponential Engineering Company (electrical engineering) and URS Corporation (historical documentation), as well as numerous other subcontractors and consultants.« less

  17. Energy management system turns data into market info

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Traynor, P.J.; Ackerman, W.J.

    1996-09-01

    The designers claim that Wisconsin Power & Light Co`s new energy management system is the first system of its type in the world in terms of the comprehensiveness and scope of its stored and retrievable data. Furthermore, the system`s link to the utility`s generating assets enables powerplant management to dispatch generation resources based on up-to-date unit characteristics. That means that the new system gives WP&L a competitive tool to optimize operations as well as fine-tune its EMS based on timely load and unit response information. Additionally, the EMS gives WP&L insight into the complex issues related to the unbundling ofmore » generation resources.« less

  18. 75 FR 13600 - Nine Mile Point Nuclear Station, LLC, Nine Mile Point Nuclear Station, Unit No. 2; Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-22

    ... shielding design and the ALARA program would continue in its current form. Offsite Doses at EPU Conditions..., such as fossil fuel or alternative fuel power generation, to provide electric generation capacity to offset future demand. Construction and operation of such a fossil-fueled or alternative-fueled plant may...

  19. Design Evolution and Verification of the A-3 Chemical Steam Generator

    NASA Technical Reports Server (NTRS)

    Kirchner, Casey K.

    2009-01-01

    Following is an overview of the Chemical Steam Generator system selected to provide vacuum conditions for a new altitude test facility, the A-3 Test Stand at Stennis Space Center (SSC) in Bay St. Louis, MS. A-3 will serve as NASA s primary facility for altitude testing of the J-2X rocket engine, to be used as the primary propulsion device for the upper stages of the Ares launch vehicles. The Chemical Steam Generators (CSGs) will produce vacuum conditions in the test cell through the production and subsequent supersonic ejection of steam into a diffuser downstream of the J-2X engine nozzle exit. The Chemical Steam Generators chosen have a rich heritage of operation at rocket engine altitude test facilities since the days of the Apollo program and are still in use at NASA White Sands Test Facility (WSTF) in New Mexico. The generators at WSTF have been modified to a degree, but are still very close to the heritage design. The intent for the A-3 implementation is to maintain this heritage design as much as possible, making minimal updates only where necessary to substitute for obsolete parts and to increase reliability. Reliability improvements are especially desired because the proposed system will require 27 generators, which is nine times the largest system installed in the 1960s. Improvements were suggested by the original design firm, Reaction Motors, by NASA SSC and NASA WSTF engineers, and by the A-3 test stand design contractor, Jacobs Technology, Inc. (JTI). This paper describes the range of improvements made to the design to date, starting with the heritage generator and the minor modifications made over time at WSTF, to the modernized configuration which will be used at A-3. The paper will discuss NASA s investment in modifications to SSC s E-2 test facility fire a full-scale Chemical Steam Generator in advance of the larger steam system installation at A-3. Risk mitigation testing will be performed in early 2009 at this test facility to verify that the CSGs operate as expected. The generator which will undergo this testing is of the most recent A-3 configuration, and will be instrumented far in excess of what is normally required for operation. The extra data will allow for easier troubleshooting and more complete knowledge of expected generator performance. In addition, the early testing will give SSC personnel experience in operating the CSG systems, which will expedite the process of installation and activation at A-3. Each Chemical Steam Generator is supported by a complement of valves, instruments, and flow control devices, with the entire assembly called a "module." The generators will be installed in groups of three, historically called "units". A module is so called because of its modular ability to be replaced or serviced without disturbing the other two modules installed on the same unit. A module is pictured in Figure 1, shown with its generator secured by white bands in its shipping (vs. installed) configuration. The heritage system at WSTF is composed of a single unit (three generator modules), pictured in Figure 2 as it was installed in 1965. In contrast, A-3 will have nine units operating in parallel to achieve vacuum conditions appropriate for testing the J-2X engine. Each of the combustors operates in two modes and achieves the so-called "full-steam" mode after all three of its stages ignite. Ignition of the first stage is achieved by exciting a spark plug; the second stage and main stage are lit by the flame front of the previous stage. The main stage burns approximately 97% of the total propellant flow and uses the heat energy to vaporize water into superheated steam. While the main stage remains unlit, the combustor is in so-called "idle" mode. In the WSTF system, this idle mode is not optimized for water usage, and does not need to be, as the water is pumped from a large reservoir. The water supply at A-3 will be contained in tanks with finite volume, so water optimization is preferred for the modnized configuration. Multiple solutions for this issue have been proposed, with the leading concept being a change to the operational definition of "idle mode," with the generator running in a lower heat flux condition.

  20. Proximity Operations and Docking Sensor Development

    NASA Technical Reports Server (NTRS)

    Howard, Richard T.; Bryan, Thomas C.; Brewster, Linda L.; Lee, James E.

    2009-01-01

    The Next Generation Advanced Video Guidance Sensor (NGAVGS) has been under development for the last three years as a long-range proximity operations and docking sensor for use in an Automated Rendezvous and Docking (AR&D) system. The first autonomous rendezvous and docking in the history of the U.S. Space Program was successfully accomplished by Orbital Express, using the Advanced Video Guidance Sensor (AVGS) as the primary docking sensor. That flight proved that the United States now has a mature and flight proven sensor technology for supporting Crew Exploration Vehicles (CEV) and Commercial Orbital Transport Systems (COTS) Automated Rendezvous and Docking (AR&D). NASA video sensors have worked well in the past: the AVGS used on the Demonstration of Autonomous Rendezvous Technology (DART) mission operated successfully in spot mode out to 2 km, and the first generation rendezvous and docking sensor, the Video Guidance Sensor (VGS), was developed and successfully flown on Space Shuttle flights in 1997 and 1998. 12 Parts obsolescence issues prevent the construction of more AVGS units, and the next generation sensor was updated to allow it to support the CEV and COTS programs. The flight proven AR&D sensor has been redesigned to update parts and add additional capabilities for CEV and COTS with the development of the Next Generation AVGS at the Marshall Space Flight Center. The obsolete imager and processor are being replaced with new radiation tolerant parts. In addition, new capabilities include greater sensor range, auto ranging capability, and real-time video output. This paper presents some sensor hardware trades, use of highly integrated laser components, and addresses the needs of future vehicles that may rendezvous and dock with the International Space Station (ISS) and other Constellation vehicles. It also discusses approaches for upgrading AVGS to address parts obsolescence, and concepts for minimizing the sensor footprint, weight, and power requirements. In addition, the testing of the brassboard and proto-type NGAVGS units will be discussed along with the use of the NGAVGS as a proximity operations and docking sensor.

  1. Some perspective decisions for the regeneration system equipment of the thermal and nuclear power plants decreasing the probability of water ingress into the turbine and rotor acceleration by return steam flow

    NASA Astrophysics Data System (ADS)

    Trifonov, N. N.; Svyatkin, F. A.; Sintsova, T. G.; Ukhanova, M. G.; Yesin, S. B.; Nikolayenkova, E. K.; Yurchenko, A. Yu.; Grigorieva, E. B.

    2016-03-01

    The regeneration system heaters are one of the sources of possible ingress of the water into the turbine. The water penetrates into the turbine either at the heaters overflow or with the return flow of steam generated when the water being in the heater boils up in the dynamic operation modes or at deenergization of the power-generating unit. The return flow of steam and water is dangerous to the turbine blades and can result in the rotor acceleration. The known protective devices used to prevent the overflow of the low-pressure and high-pressure heaters (LPH and HPH), of the horizontal and vertical heaters of heating-system water (HWH and VWH), as well as of the deaerators and low-pressure mixing heaters (LPMH) were considered. The main protective methods of the steam and water return flows supplied by the heaters in dynamic operation modes or at deenergization of the power-generating unit are described. Previous operating experience shows that the available protections do not fully prevent water ingress into the turbine and the rotor acceleration and, therefore, the development of measures to decrease the possibility of ingress of the water into the turbine is an actual problem. The measures allowing eliminating or reducing the water mass in the heaters are expounded; some of them were designed by the specialists of OAO Polzunov Scientific and Development Association on Research and Design of Power Equipment (NPO CKTI) and are efficiently introduced at heat power plants and nuclear power plants. The suggested technical solutions allow reducing the possibility of the water ingress into the turbine and rotor acceleration by return steam flow in the dynamic operation modes or in the case of power generating unit deenergization. Some of these solutions have been tested in experimental-industrial exploitation and can be used in industry.

  2. 77 FR 56877 - Biweekly Notice; Applications and Amendments to Facility Operating Licenses and Combined Licenses...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-14

    ... leak rate test following the replacement of the steam generators in Unit 2. The intent of post... to be publicly disclosed. The NRC posts all comment submissions at http://www.regulations.gov as well... evaluated? Response: No. There are no changes to design, no changes to operating procedures and the revised...

  3. Climate change impact on operation of dams and hydroelectricity generation in the Northeastern United States

    NASA Astrophysics Data System (ADS)

    Ehsani, N.; Vorosmarty, C. J.; Fekete, B. M.

    2016-12-01

    We are using a large-scale, high-resolution, fully integrated hydrological/reservoir/hydroelectricity model to investigate the impact of climate change on the operation of 11037 dams and generation of electricity from 375 hydroelectric power plants in the Northeastern United States. Moreover, we estimate the hydropower potential of the region by energizing the existing non-powered dams and then studying the impact of climate change on the hydropower potential. We show that climate change increases the impact of dams on the hydrology of the region. Warmer temperatures produce shorter frozen periods, earlier snowmelt and elevated evapotranspiration rates, which when combined with changes in precipitation, are projected to increase water availability in winter but reduce it during summer. As a result, the water that is stored by dams will be more than ever a necessary part of the routine water systems operations to compensate for these seasonal imbalances. The function of dams as emergency water storage for creating drought resiliency will mostly diminish in the future. Building more dams to cope with the local impacts of climate change on water resources and to offset the increased drought vulnerability may thus be inevitable. Annual hydroelectricity generation in the region is 41 Twh. Our estimate of the annual hydropower potential of non-powered dams adds up to 350 Twh. Climate change may reduce hydropower potential from non-powered dams by up to 13% and reduce current hydroelectricity generation by up to 8% annually. Hydroelectricity generation and hydropower potential may increase in winter months and decline in months of summer and fall. These changes call for recalibration of dam operations and may raise conflict of interests in multipurpose dams.

  4. DOE-NE Light Water Reactor Sustainability Program and EPRI Long-Term Operations Program. Joint Research and Development Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Williams, Don

    2014-04-01

    Nuclear power has contributed almost 20% of the total amount of electricity generated in the United States over the past two decades. High capacity factors and low operating costs make nuclear power plants (NPPs) some of the most economical power generators available. Further, nuclear power remains the single largest contributor (nearly 70%) of non-greenhouse gas-emitting electric power generation in the United States. Even when major refurbishments are performed to extend operating life, these plants continue to represent cost-effective, low-carbon assets to the nation’s electrical generation capability. By the end of 2014, about one-third of the existing domestic fleet will havemore » passed their 40th anniversary of power operations, and about one-half of the fleet will reach the same 40-year mark within this decade. Recognizing the challenges associated with pursuing extended service life of commercial nuclear power plants, the U.S. Department of Energy’s (DOE) Office of Nuclear Energy (NE) and the Electric Power Research Institute (EPRI) have established separate but complementary research and development programs (DOE-NE’s Light Water Reactor Sustainability [LWRS] Program and EPRI’s Long-Term Operations [LTO] Program) to address these challenges. To ensure that a proper linkage is maintained between the programs, DOE-NE and EPRI executed a memorandum of understanding in late 2010 to “establish guiding principles under which research activities (between LWRS and LTO) could be coordinated to the benefit of both parties.” This document represents the third annual revision to the initial version (March 2011) of the plan as called for in the memorandum of understanding.« less

  5. How run-of-river operation affects hydropower generation and value.

    PubMed

    Jager, Henriette I; Bevelhimer, Mark S

    2007-12-01

    Regulated rivers in the United States are required to support human water uses while preserving aquatic ecosystems. However, the effectiveness of hydropower license requirements nationwide has not been demonstrated. One requirement that has become more common is "run-of-river" (ROR) operation, which restores a natural flow regime. It is widely believed that ROR requirements (1) are mandated to protect aquatic biota, (2) decrease hydropower generation per unit flow, and (3) decrease energy revenue. We tested these three assumptions by reviewing hydropower projects with license-mandated changes from peaking to ROR operation. We found that ROR operation was often prescribed in states with strong water-quality certification requirements and migratory fish species. Although benefits to aquatic resources were frequently cited, changes were often motivated by other considerations. After controlling for climate, the overall change in annual generation efficiency across projects because of the change in operation was not significant. However, significant decreases were detected at one quarter of individual hydropower projects. As expected, we observed a decrease in flow during peak demand at 7 of 10 projects. At the remaining projects, diurnal fluctuations actually increased because of operation of upstream storage projects. The economic implications of these results, including both producer costs and ecologic benefits, are discussed. We conclude that regional-scale studies of hydropower regulation, such as this one, are long overdue. Public dissemination of flow data, license provisions, and monitoring data by way of on-line access would facilitate regional policy analysis while increasing regulatory transparency and providing feedback to decision makers.

  6. Use of a turboexpander in steam power units for heat energy recovery in heat supply systems

    NASA Astrophysics Data System (ADS)

    Sadykov, R. A.; Daminov, A. Z.; Solomin, I. N.; Futin, V. A.

    2016-05-01

    A method for raising the efficiency of a boiler plant by installing a unit operating by the organic Rankine cycle is presented. Such units allow one to generate electricity to cover the auxiliaries of a heat source at a heat-transfer fluid temperature of no more than 130°C. The results of commissioning tests of boilers revealed that their efficiency is maximized under a load that is close or corresponds to the nominal one. If this load is maintained constantly, excess heat energy is produced. This excess may be used to generate electric energy in a steam power unit with a turboexpander. A way to insert this unit into the flow diagram of a boiler plant is proposed. The results of analysis of turbine types (turboexpanders included) with various capacities are presented, and the optimum type for the proposed flow diagram is chosen. The methodology for the design of turboexpanders and compressors used in the oil and gas industry and their operational data were applied in the analysis of a turboexpander. The results of the thermogasdynamic analysis of a turboexpander and the engineered shape of an axial-radial impeller are presented. Halocarbon R245fa is chosen as the working medium based on its calorimetric properties.

  7. Improving Power System Modeling. A Tool to Link Capacity Expansion and Production Cost Models

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Diakov, Victor; Cole, Wesley; Sullivan, Patrick

    2015-11-01

    Capacity expansion models (CEM) provide a high-level long-term view at the prospects of the evolving power system. In simulating the possibilities of long-term capacity expansion, it is important to maintain the viability of power system operation in the short-term (daily, hourly and sub-hourly) scales. Production-cost models (PCM) simulate routine power system operation on these shorter time scales using detailed load, transmission and generation fleet data by minimizing production costs and following reliability requirements. When based on CEM 'predictions' about generating unit retirements and buildup, PCM provide more detailed simulation for the short-term system operation and, consequently, may confirm the validitymore » of capacity expansion predictions. Further, production cost model simulations of a system that is based on capacity expansion model solution are 'evolutionary' sound: the generator mix is the result of logical sequence of unit retirement and buildup resulting from policy and incentives. The above has motivated us to bridge CEM with PCM by building a capacity expansion - to - production cost model Linking Tool (CEPCoLT). The Linking Tool is built to onset capacity expansion model prescriptions onto production cost model inputs. NREL's ReEDS and Energy Examplar's PLEXOS are the capacity expansion and the production cost models, respectively. Via the Linking Tool, PLEXOS provides details of operation for the regionally-defined ReEDS scenarios.« less

  8. Status of steam generator tubing integrity at Jaslovske Bohunice NPP

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cepcek, S.

    1997-02-01

    Steam generator represents one of the most important component of nuclear power plants. Especially, loss of tubing integrity of steam generators can lead to the primary coolant leak to secondary circuit and in worse cases to the unit shut down or to the PTS events occurrence. Therefore, to ensure the steam generator tubing integrity and the current knowledge about tube degradation propagation and development is of the highest importance. In this paper the present status of steam generator tubing integrity in operated NPP in Slovak Republic is presented.

  9. Development of an automated potable water bactericide monitoring unit

    NASA Technical Reports Server (NTRS)

    Walsh, J. M.; Brawner, C. C.; Sauer, R. L.

    1975-01-01

    A monitor unit has been developed that permits the direct determination of the level of elemental iodine, used for microbiological control, in a spacecraft potable water supply system. Salient features of unit include low weight, volume and maintenance requirements, complete automatic operation, no inflight calibration, no expendables (except electrical current) and high accuracy and precision. This unit is capable of providing a signal to a controller that, in turn, automatically adjusts the addition rate of iodine to the potable water system so that a predetermined level of iodine can be maintained. In addition, the monitor provides a reading whereby the crewman can verify that the proper amount of iodine (within a range) is present in the water. A development history of the monitor is presented along with its design and theory of operation. Also presented are the results generated through testing of the unit in a simulated Shuttle potable water system.

  10. Alaskan refiner raced against winter to relocate vacuum unit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gdula, L.M.; Wentworth, J.A.

    In late November 1994, San Antonio-based Tesoro Petroleum Corp. and Litwin Engineers and Constructors Inc. completed the relocation and refurbishment of a $25 million vacuum unit at Tesoro`s 72,000 b/d Kenai refinery. The addition of the vacuum distillation unit is a critical component in Tesoro`s market-driven strategy to enhance operating profits by maximizing production of higher-margin products such as gasoline and jet fuel. With its new vacuum distillation unit, Tesoro has reduced production of lower-value residual fuel oil while recovering more lighter, high-value material. The paper discusses the economic and strategic merits of purchasing and relocating an existing vacuum unit,more » the project schedule, new equipment, dismantling and transport, installation, tie-ins and start-up, products, operating changes, corrosion concerns, off gas, steam generation, design changes, environmental issues, reporting requirements, and accomplishments.« less

  11. Renewable Electricity Futures for the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mai, Trieu; Hand, Maureen; Baldwin, Sam F.

    2014-04-14

    This paper highlights the key results from the Renewable Electricity (RE) Futures Study. It is a detailed consideration of renewable electricity in the United States. The paper focuses on technical issues related to the operability of the U. S. electricity grid and provides initial answers to important questions about the integration of high penetrations of renewable electricity technologies from a national perspective. The results indicate that the future U. S. electricity system that is largely powered by renewable sources is possible and the further work is warranted to investigate this clean generation pathway. The central conclusion of the analysis ismore » that renewable electricity generation from technologies that are commercially available today, in combination with a more flexible electric system, is more than adequate to supply 80% of the total U. S. electricity generation in 2050 while meeting electricity demand on an hourly basis in every region of the United States.« less

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nakafuji, Dora; Gouveia, Lauren

    This project supports development of the next generation, integrated energy management infrastructure (EMS) able to incorporate advance visualization of behind-the-meter distributed resource information and probabilistic renewable energy generation forecasts to inform real-time operational decisions. The project involves end-users and active feedback from an Utility Advisory Team (UAT) to help inform how information can be used to enhance operational functions (e.g. unit commitment, load forecasting, Automatic Generation Control (AGC) reserve monitoring, ramp alerts) within two major EMS platforms. Objectives include: Engaging utility operations personnel to develop user input on displays, set expectations, test and review; Developing ease of use and timelinessmore » metrics for measuring enhancements; Developing prototype integrated capabilities within two operational EMS environments; Demonstrating an integrated decision analysis platform with real-time wind and solar forecasting information and timely distributed resource information; Seamlessly integrating new 4-dimensional information into operations without increasing workload and complexities; Developing sufficient analytics to inform and confidently transform and adopt new operating practices and procedures; Disseminating project lessons learned through industry sponsored workshops and conferences;Building on collaborative utility-vendor partnership and industry capabilities« less

  13. Intense generation of respirable metal nanoparticles from a low-power soldering unit.

    PubMed

    Gómez, Virginia; Irusta, Silvia; Balas, Francisco; Santamaria, Jesus

    2013-07-15

    Evidence of intense nanoparticle generation from a low power (45W) flux soldering unit is presented. This is a familiar device often used in daily life, including home repairs and school electronic laboratories. We demonstrate that metal-containing nanoparticles may reach high concentrations (ca. 10(6) particles/cm(3)) within the breathing range of the operator, with initial size distributions centered at 35-60nm The morphological and chemical analysis of nanoparticle agglomerates collected on TEM grids and filters confirms their multiparticle structure and the presence of metals. Copyright © 2013 Elsevier B.V. All rights reserved.

  14. Operational procedure for computer program for design point characteristics of a gas generator or a turbojet lift engine for V/STOL applications

    NASA Technical Reports Server (NTRS)

    Krebs, R. P.

    1972-01-01

    The computer program described calculates the design-point characteristics of a gas generator or a turbojet lift engine for V/STOL applications. The program computes the dimensions and mass, as well as the thermodynamic performance of the model engine and its components. The program was written in FORTRAN 4 language. Provision has been made so that the program accepts input values in either SI Units or U.S. Customary Units. Each engine design-point calculation requires less than 0.5 second of 7094 computer time.

  15. Generating short-term probabilistic wind power scenarios via nonparametric forecast error density estimators: Generating short-term probabilistic wind power scenarios via nonparametric forecast error density estimators

    DOE PAGES

    Staid, Andrea; Watson, Jean -Paul; Wets, Roger J. -B.; ...

    2017-07-11

    Forecasts of available wind power are critical in key electric power systems operations planning problems, including economic dispatch and unit commitment. Such forecasts are necessarily uncertain, limiting the reliability and cost effectiveness of operations planning models based on a single deterministic or “point” forecast. A common approach to address this limitation involves the use of a number of probabilistic scenarios, each specifying a possible trajectory of wind power production, with associated probability. We present and analyze a novel method for generating probabilistic wind power scenarios, leveraging available historical information in the form of forecasted and corresponding observed wind power timemore » series. We estimate non-parametric forecast error densities, specifically using epi-spline basis functions, allowing us to capture the skewed and non-parametric nature of error densities observed in real-world data. We then describe a method to generate probabilistic scenarios from these basis functions that allows users to control for the degree to which extreme errors are captured.We compare the performance of our approach to the current state-of-the-art considering publicly available data associated with the Bonneville Power Administration, analyzing aggregate production of a number of wind farms over a large geographic region. Finally, we discuss the advantages of our approach in the context of specific power systems operations planning problems: stochastic unit commitment and economic dispatch. Here, our methodology is embodied in the joint Sandia – University of California Davis Prescient software package for assessing and analyzing stochastic operations strategies.« less

  16. Generating short-term probabilistic wind power scenarios via nonparametric forecast error density estimators: Generating short-term probabilistic wind power scenarios via nonparametric forecast error density estimators

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Staid, Andrea; Watson, Jean -Paul; Wets, Roger J. -B.

    Forecasts of available wind power are critical in key electric power systems operations planning problems, including economic dispatch and unit commitment. Such forecasts are necessarily uncertain, limiting the reliability and cost effectiveness of operations planning models based on a single deterministic or “point” forecast. A common approach to address this limitation involves the use of a number of probabilistic scenarios, each specifying a possible trajectory of wind power production, with associated probability. We present and analyze a novel method for generating probabilistic wind power scenarios, leveraging available historical information in the form of forecasted and corresponding observed wind power timemore » series. We estimate non-parametric forecast error densities, specifically using epi-spline basis functions, allowing us to capture the skewed and non-parametric nature of error densities observed in real-world data. We then describe a method to generate probabilistic scenarios from these basis functions that allows users to control for the degree to which extreme errors are captured.We compare the performance of our approach to the current state-of-the-art considering publicly available data associated with the Bonneville Power Administration, analyzing aggregate production of a number of wind farms over a large geographic region. Finally, we discuss the advantages of our approach in the context of specific power systems operations planning problems: stochastic unit commitment and economic dispatch. Here, our methodology is embodied in the joint Sandia – University of California Davis Prescient software package for assessing and analyzing stochastic operations strategies.« less

  17. KSC-08pd1652

    NASA Image and Video Library

    2008-06-10

    CAPE CANAVERAL, Fla. – In Orbiter Processing Facility bay No. 2, technicians begin installation of an auxiliary power unit 3, or APU3, in space shuttle Endeavour for the STS-126 mission. The auxiliary power unit is a hydrazine-fueled, turbine-driven power unit that generates mechanical shaft power to drive a hydraulic pump that produces pressure for the orbiter's hydraulic system. There are three separate APUs, three hydraulic pumps and three hydraulic systems, located in the aft fuselage of the orbiter. When the three auxiliary power units are started five minutes before lift-off, the hydraulic systems are used to position the three main engines for activation, control various propellant valves on the engines and position orbiter aerosurfaces. The auxiliary power units are not operated after the first orbital maneuvering system thrusting period because hydraulic power is no longer required. One power unit is operated briefly one day before deorbit to support checkout of the orbiter flight control system. One auxiliary power unit is restarted before the deorbit thrusting period. The two remaining units are started after the deorbit thrusting maneuver and operate continuously through entry, landing and landing rollout. On STS-126, Endeavour will deliver a multi-purpose logistics module to the International Space Station. Launch is targeted for Nov. 10. Photo credit: NASA/Kim Shiflett

  18. KSC-08pd1651

    NASA Image and Video Library

    2008-06-10

    CAPE CANAVERAL, Fla. – In Orbiter Processing Facility bay No. 2, technicians begin installation of an auxiliary power unit 3, or APU3, in space shuttle Endeavour for the STS-126 mission. The auxiliary power unit is a hydrazine-fueled, turbine-driven power unit that generates mechanical shaft power to drive a hydraulic pump that produces pressure for the orbiter's hydraulic system. There are three separate APUs, three hydraulic pumps and three hydraulic systems, located in the aft fuselage of the orbiter. When the three auxiliary power units are started five minutes before lift-off, the hydraulic systems are used to position the three main engines for activation, control various propellant valves on the engines and position orbiter aerosurfaces. The auxiliary power units are not operated after the first orbital maneuvering system thrusting period because hydraulic power is no longer required. One power unit is operated briefly one day before deorbit to support checkout of the orbiter flight control system. One auxiliary power unit is restarted before the deorbit thrusting period. The two remaining units are started after the deorbit thrusting maneuver and operate continuously through entry, landing and landing rollout. On STS-126, Endeavour will deliver a multi-purpose logistics module to the International Space Station. Launch is targeted for Nov. 10. Photo credit: NASA/Kim Shiflett

  19. KSC-08pd1654

    NASA Image and Video Library

    2008-06-10

    CAPE CANAVERAL, Fla. – In Orbiter Processing Facility bay No. 2, auxiliary power unit 3, or APU3, is in place on space shuttle Endeavour for the STS-126 mission. The auxiliary power unit is a hydrazine-fueled, turbine-driven power unit that generates mechanical shaft power to drive a hydraulic pump that produces pressure for the orbiter's hydraulic system. There are three separate APUs, three hydraulic pumps and three hydraulic systems, located in the aft fuselage of the orbiter. When the three auxiliary power units are started five minutes before lift-off, the hydraulic systems are used to position the three main engines for activation, control various propellant valves on the engines and position orbiter aerosurfaces. The auxiliary power units are not operated after the first orbital maneuvering system thrusting period because hydraulic power is no longer required. One power unit is operated briefly one day before deorbit to support checkout of the orbiter flight control system. One auxiliary power unit is restarted before the deorbit thrusting period. The two remaining units are started after the deorbit thrusting maneuver and operate continuously through entry, landing and landing rollout. On STS-126, Endeavour will deliver a multi-purpose logistics module to the International Space Station. Launch is targeted for Nov. 10. Photo credit: NASA/Kim Shiflett

  20. KSC-08pd1653

    NASA Image and Video Library

    2008-06-10

    CAPE CANAVERAL, Fla. – In Orbiter Processing Facility bay No. 2, technicians install auxiliary power unit 3, or APU3, in space shuttle Endeavour for the STS-126 mission. The auxiliary power unit is a hydrazine-fueled, turbine-driven power unit that generates mechanical shaft power to drive a hydraulic pump that produces pressure for the orbiter's hydraulic system. There are three separate APUs, three hydraulic pumps and three hydraulic systems, located in the aft fuselage of the orbiter. When the three auxiliary power units are started five minutes before lift-off, the hydraulic systems are used to position the three main engines for activation, control various propellant valves on the engines and position orbiter aerosurfaces. The auxiliary power units are not operated after the first orbital maneuvering system thrusting period because hydraulic power is no longer required. One power unit is operated briefly one day before deorbit to support checkout of the orbiter flight control system. One auxiliary power unit is restarted before the deorbit thrusting period. The two remaining units are started after the deorbit thrusting maneuver and operate continuously through entry, landing and landing rollout. On STS-126, Endeavour will deliver a multi-purpose logistics module to the International Space Station. Launch is targeted for Nov. 10. Photo credit: NASA/Kim Shiflett

  1. Modeling Load Dynamics to Support Resiliency-based Operations in Low-Inertia Microgrids

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tuffner, Francis K.; Schneider, Kevin P.; Hansen, Jacob

    Microgrids have repeatedly demonstrated the ability to provide uninterrupted service to critical end-use loads during normal outages, severe weather events, and natural disasters. While their ability to provide critical services is well documented, microgrids present a more dynamic operational environment than grid-connected distribution systems. The electrodynamics of a microgrid are commonly driven by the high inertia of rotating generators, which are common in many microgrids. In such high-inertia systems, the impact of end-use load electromechanical dynamics are often not examined. However, with the increased penetration of inverter-based generation with little or no inertia, it is necessary to consider the impactmore » that the dynamics of the end-use loads have on the operations of microgrids, particularly for a resiliency-based operation. These operations include, but are not limited to, switching operations, loss of generating units, and the starting of induction motors. This paper examines the importance of including multi-state electromechanical dynamic models of the end-use load when evaluating the operations of low inertia microgrids, and shows that by properly representing their behavior, it is possible to cost effectively size equipment while supporting resilient operations of critical end-use loads.« less

  2. Modeling Load Dynamics to Support Resiliency-based Operations in Low-Inertia Microgrids

    DOE PAGES

    Tuffner, Francis K.; Schneider, Kevin P.; Hansen, Jacob; ...

    2018-03-07

    Microgrids have repeatedly demonstrated the ability to provide uninterrupted service to critical end-use loads during normal outages, severe weather events, and natural disasters. While their ability to provide critical services is well documented, microgrids present a more dynamic operational environment than grid-connected distribution systems. The electrodynamics of a microgrid are commonly driven by the high inertia of rotating generators, which are common in many microgrids. In such high-inertia systems, the impact of end-use load electromechanical dynamics are often not examined. However, with the increased penetration of inverter-based generation with little or no inertia, it is necessary to consider the impactmore » that the dynamics of the end-use loads have on the operations of microgrids, particularly for a resiliency-based operation. These operations include, but are not limited to, switching operations, loss of generating units, and the starting of induction motors. This paper examines the importance of including multi-state electromechanical dynamic models of the end-use load when evaluating the operations of low inertia microgrids, and shows that by properly representing their behavior, it is possible to cost effectively size equipment while supporting resilient operations of critical end-use loads.« less

  3. Incorporating Wind Power Forecast Uncertainties Into Stochastic Unit Commitment Using Neural Network-Based Prediction Intervals.

    PubMed

    Quan, Hao; Srinivasan, Dipti; Khosravi, Abbas

    2015-09-01

    Penetration of renewable energy resources, such as wind and solar power, into power systems significantly increases the uncertainties on system operation, stability, and reliability in smart grids. In this paper, the nonparametric neural network-based prediction intervals (PIs) are implemented for forecast uncertainty quantification. Instead of a single level PI, wind power forecast uncertainties are represented in a list of PIs. These PIs are then decomposed into quantiles of wind power. A new scenario generation method is proposed to handle wind power forecast uncertainties. For each hour, an empirical cumulative distribution function (ECDF) is fitted to these quantile points. The Monte Carlo simulation method is used to generate scenarios from the ECDF. Then the wind power scenarios are incorporated into a stochastic security-constrained unit commitment (SCUC) model. The heuristic genetic algorithm is utilized to solve the stochastic SCUC problem. Five deterministic and four stochastic case studies incorporated with interval forecasts of wind power are implemented. The results of these cases are presented and discussed together. Generation costs, and the scheduled and real-time economic dispatch reserves of different unit commitment strategies are compared. The experimental results show that the stochastic model is more robust than deterministic ones and, thus, decreases the risk in system operations of smart grids.

  4. Advanced Stirling Radioisotope Generator Thermal Power Model in Thermal Desktop SINDA/FLUINT Analyzer

    NASA Technical Reports Server (NTRS)

    Wang, Xiao-Yen; Fabanich, William A.; Schmitz, Paul C.

    2012-01-01

    This paper presents a three-dimensional Advanced Stirling Radioisotope Generator (ASRG) thermal power model that was built using the Thermal Desktop SINDA/FLUINT thermal analyzer. The model was correlated with ASRG engineering unit (EU) test data and ASRG flight unit predictions from Lockheed Martin's Ideas TMG thermal model. ASRG performance under (1) ASC hot-end temperatures, (2) ambient temperatures, and (3) years of mission for the general purpose heat source fuel decay was predicted using this model for the flight unit. The results were compared with those reported by Lockheed Martin and showed good agreement. In addition, the model was used to study the performance of the ASRG flight unit for operations on the ground and on the surface of Titan, and the concept of using gold film to reduce thermal loss through insulation was investigated.

  5. Visualization of information with an established order

    DOEpatents

    Wong, Pak Chung [Richland, WA; Foote, Harlan P [Richmond, WA; Thomas, James J [Richland, WA; Wong, Kwong-Kwok [Sugar Land, TX

    2007-02-13

    Among the embodiments of the present invention is a system including one or more processors operable to access data representative of a biopolymer sequence of monomer units. The one or more processors are further operable to establish a pattern corresponding to at least one fractal curve and generate one or more output signals corresponding to a number of image elements each representative of one of the monomer units. Also included is a display device responsive to the one or more output signals to visualize the biopolymer sequence by displaying the image elements in accordance with the pattern.

  6. Secondary Waste Form Development and Optimization—Cast Stone

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sundaram, S. K.; Parker, Kent E.; Valenta, Michelle M.

    2011-07-14

    Washington River Protection Services is considering the design and construction of a Solidification Treatment Unit (STU) for the Effluent Treatment Facility (ETF) at Hanford. The ETF is a Resource Conservation and Recovery Act-permitted, multi-waste, treatment and storage unit and can accept dangerous, low-level, and mixed wastewaters for treatment. The STU needs to be operational by 2018 to receive secondary liquid wastes generated during operation of the Hanford Tank Waste Treatment and Immobilization Plant (WTP). The STU to ETF will provide the additional capacity needed for ETF to process the increased volume of secondary wastes expected to be produced by WTP.

  7. Wind Power Forecasting Error Frequency Analyses for Operational Power System Studies: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Florita, A.; Hodge, B. M.; Milligan, M.

    2012-08-01

    The examination of wind power forecasting errors is crucial for optimal unit commitment and economic dispatch of power systems with significant wind power penetrations. This scheduling process includes both renewable and nonrenewable generators, and the incorporation of wind power forecasts will become increasingly important as wind fleets constitute a larger portion of generation portfolios. This research considers the Western Wind and Solar Integration Study database of wind power forecasts and numerical actualizations. This database comprises more than 30,000 locations spread over the western United States, with a total wind power capacity of 960 GW. Error analyses for individual sites andmore » for specific balancing areas are performed using the database, quantifying the fit to theoretical distributions through goodness-of-fit metrics. Insights into wind-power forecasting error distributions are established for various levels of temporal and spatial resolution, contrasts made among the frequency distribution alternatives, and recommendations put forth for harnessing the results. Empirical data are used to produce more realistic site-level forecasts than previously employed, such that higher resolution operational studies are possible. This research feeds into a larger work of renewable integration through the links wind power forecasting has with various operational issues, such as stochastic unit commitment and flexible reserve level determination.« less

  8. Estimation of lifespan and economy parameters of steam-turbine power units in thermal power plants using varying regimes

    NASA Astrophysics Data System (ADS)

    Aminov, R. Z.; Shkret, A. F.; Garievskii, M. V.

    2016-08-01

    The use of potent power units in thermal and nuclear power plants in order to regulate the loads results in intense wear of power generating equipment and reduction in cost efficiency of their operation. We review the methodology of a quantitative assessment of the lifespan and wear of steam-turbine power units and estimate the effect of various operation regimes upon their efficiency. To assess the power units' equipment wear, we suggest using the concept of a turbine's equivalent lifespan. We give calculation formulae and an example of calculation of the lifespan of a steam-turbine power unit for supercritical parameters of steam for different options of its loading. The equivalent lifespan exceeds the turbine's assigned lifespan only provided daily shutdown of the power unit during the night off-peak time. We obtained the engineering and economical indices of the power unit operation for different loading regulation options in daily and weekly diagrams. We proved the change in the prime cost of electric power depending on the operation regimes and annual daily number of unloading (non-use) of the power unit's installed capacity. According to the calculation results, the prime cost of electric power for the assumed initial data varies from 11.3 cents/(kW h) in the basic regime of power unit operation (with an equivalent operation time of 166700 hours) to 15.5 cents/(kW h) in the regime with night and holiday shutdowns. The reduction of using the installed capacity of power unit at varying regimes from 3.5 to 11.9 hours per day can increase the prime cost of energy from 4.2 to 37.4%. Furthermore, repair and maintenance costs grow by 4.5% and by 3 times, respectively, in comparison with the basic regime. These results indicate the need to create special maneuverable equipment for working in the varying section of the electric load diagram.

  9. Thermal tests of the SGT5-4000F gas-turbine plant of the PGU-420T power-generating unit at Combined Heat And Power Plant 16 of Mosenergo

    NASA Astrophysics Data System (ADS)

    Teplov, B. D.; Radin, Yu. A.; Filin, A. A.; Rudenko, D. V.

    2016-08-01

    In December 2014, the PGU-420T power-generating unit was put into operation at the Combined Heat and Power Plant 16, an affiliated company of PAO Mosenergo. In 2014-2015, thermal tests of the SGT5- 4000F gas-turbine plant (GTP) integrated into the power-generating unit were carried out. In the article, the test conditions are described and the test results are presented and analyzed. During the tests, 92 operating modes within a wide range of electrical loads and ambient air temperatures and operating conditions of the GTP when fired with fuel oil were investigated. In the tests, an authorized automated measuring system was applied. The experimental data were processed according to ISO 2314:2009 "Gas turbines—Acceptance tests" standard. The available capacity and the GTP efficiency vary from 266 MW and 38.8% to 302 MW and 39.8%, respectively, within the ambient air temperature range from +24 to-12°C, while the turbine inlet temperature decreases from 1200 to 1250°C. The switch to firing fuel oil results in a reduction in the turbine inlet temperature and the capacity of the GTP. With the full load and a reduction in the ambient temperature from +24 to-12°C, the compressor efficiency decreases from 89.6 to 86.4%. The turbine efficiency is approximately 89-91%. Within the investigated range of power output, the emissions of nitrogen oxides do not exceed 35 ppm for the gas-fired plant and 65 ppm for the fuel-oil-fired plant. Within the range of the GTP power output from 50 to 100% of the rated output, the combustion chamber operates without underburning and with hardly any CO being formed. At low loads close to the no-load operation mode, the CO emissions drastically increase.

  10. 77 FR 36015 - Atomic Safety and Licensing Board; Entergy Nuclear Operations, Inc. (Indian Point Nuclear...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-247-LR and 50-286-LR; ASLBP No. 07-858-03-LR-BD01] Atomic Safety and Licensing Board; Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3); Notice of Hearing (Application for License Renewal) June 8, 2012. Before Administrative Judges: Lawrence G. McDade, Chairman, Dr....

  11. Know how to maximize maintenance spending

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carrino, A.J.; Jones, R.B.; Platt, W.E.

    Solomon has developed a methodology to determine a large optimum point where availability meets maintenance spending for Powder River Basin (PRB) coal-fired units. Using a database of sufficient size and composition across various operating ranges, Solomon generated an algorithm that predicts the relationship between maintenance spending and availability. Coupling this generalized algorithm with a unit-specific market-loss curve determines the optimum spending for a facility. The article presents the results of the analysis, how this methodology can be applied to develop optimum operating and financial targets for specific units and markets and a process to achieve those targets. It also describesmore » how this methodology can be used for other types of fossil-fired technologies and future enhancements to the analysis. 5 figs.« less

  12. 40 CFR 98.30 - Definition of the source category.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... generators and emergency equipment, as defined in § 98.6. (3) Irrigation pumps at agricultural operations. (4... a unit that combusts hazardous waste (as defined in 40 CFR 261.3), reporting of GHG emissions is not...

  13. 75 FR 9622 - Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 1 and 2; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-03

    ... requirements similar to those previously imposed by Commission orders issued after the terrorist attacks of... Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Cyber Security Plan...

  14. Tdp studies and tests for C. A. Energia Electrica de Venezuela (enelven) at planta ramon laguna, units RL-17 and RL-10. Volume 1. Executive summary, RL-17 test report, and gas conversion proposals. Export trade information

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-03-28

    The study, conducted by Babcock and Wilcox, was funded by the U.S. Trade and Development agency on behalf of Enelven. In order to maximize generated power output and minimize operating costs at Planta Ramon Laguna, tests were done to evaluate the condition of equipment at the plant. In order to identify any damage and determine the operating output of each unit, assessments were done of the furnaces, boilers, generators and boiler feed pumps being used in the plant. The report presents the results of these tests. This is the first of three volumes and it is divided into the followingmore » sections: (1) Executive Summary; (2) Hydrogen Damage Assessment; (3) RL-17 Gas Conversion Proposal; (4) RL-10 and RL-11 Gas Conversion Proposals.« less

  15. Flexible operation of batteries in power system scheduling with renewable energy

    DOE PAGES

    Li, Nan; Uckun, Canan; Constantinescu, Emil M.; ...

    2015-12-17

    The fast growing expansion of renewable energy increases the complexities in balancing generation and demand in the power system. The energy-shifting and fast-ramping capability of energy storage has led to increasing interests in batteries to facilitate the integration of renewable resources. In this paper, we present a two-step framework to evaluate the potential value of energy storage in power systems with renewable generation. First, we formulate a stochastic unit commitment approach with wind power forecast uncertainty and energy storage. Second, the solution from the stochastic unit commitment is used to derive a flexible schedule for energy storage in economic dispatchmore » where the look-ahead horizon is limited. Here, analysis is conducted on the IEEE 24-bus system to demonstrate the benefits of battery storage in systems with renewable resources and the effectiveness of the proposed battery operation strategy.« less

  16. The AP1000{sup R} China projects move forward to construction completion and equipment installation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harrop, G.

    2012-07-01

    The AP1000 design is the only Generation III+ technology to receive design certification from the U.S. Nuclear Regulatory Commission. This evolutionary design provides the highest safety and performance standards and has several distinct advantages over other designs, including improved operations and reduced construction schedule risks through the use of modern, modular, engineering principles that allow construction and fabrication tasks traditionally performed in sequence to be undertaken in parallel. Since the first granting of Design Certification in 2005 by the NRC, the AP1000 design has been modified to meet emergent NRC requirements such as those requiring the design to withstand themore » impact of an aircraft crash. Both domestic and foreign utilities have turned to the Westinghouse AP1000 plant design to meet their near - and long-term sustainable energy needs. The first ever deployment of this advanced U.S. nuclear power technology began in China in 2007 with the award of a contract to build four AP1000 units, constructed in pairs at the coastal sites of Sanmen (Zhejiang Province) and Haiyang (Shandong Province). Currently, all four units are at an advanced stage of construction. The commercial operation date for Sanmen Unit 1 is November 2013 followed by Haiyang Unit 1 being operational in May 2014. Construction and equipment manufacture is at an advanced stage. Sanmen Unit 1 equipment that has been delivered includes the reactor vessel, the reactor vessel closure head, the passive residual heat removal heat exchanger, the integrated head package, the polar crane, and the refueling machine. The steam generators are also completed. The RV was installed within the containment vessel building in September 2011. The installation of this major equipment will allow the setting of the containment vessel top head. Haiyang Unit 1 is also achieving significant progress. Significant benefits continue to be realized as a result of lessons learned and experience gained from the first-of-a-kind activities for Sanmen Unit 1 and AP1000 equipment design and manufacturing. For example, the nuclear island basemat at Haiyang Units 1 and 2 and Sanmen Unit 2 was laid in less time than that of Sanmen Unit 1, the ultra-large steam generator and RV forging lead times were reduced for the follow on units, and the fabrication of the auxiliary building module for Haiyang Unit 1 took less time than for the Sanmen first unit. These benefits are also being realized by the United States AP1000 project construction and fabrication modules, and equipment. Some difficulties arise from building this first-of-a-kind (advanced passive) type of plant; however, these difficulties are being overcome and the overall schedule remains achievable. (authors)« less

  17. 50. VIEW LOOKING SOUTHEAST AT A MOTORGENERATOR SET LOCATED UNDER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    50. VIEW LOOKING SOUTHEAST AT A MOTOR-GENERATOR SET LOCATED UNDER CONTROL ROOM. THREE 450 kva., 2500 VOLT, 60 CYCLE MOTOR-GENERATOR UNITS PROVIDED POWER FOR THE RAILROAD SIGNAL SYSTEM. 25 CYCLE POWER WAS PROVIDED TO THE MOTOR (LEFT BACKGROUND). THE MOTOR TURNED THE GENERATOR (CENTER FOREGROUND) WHICH PRODUCED 60 CYCLE POWER TO OPERATE LIGHTS AND SIGNALING DEVICES. - New York, New Haven & Hartford Railroad, Cos Cob Power Plant, Sound Shore Drive, Greenwich, Fairfield County, CT

  18. Martins Creek S. E. S. 800-MW Units 3 and 4: design and operating experience with axial-flow FD and ID fans

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Curley, C.C.; Overas, A.J.

    1976-01-01

    The design and performance of the variable-pitch axial-flow forced-draft and induced-draft fans used in two 820MW generating units at the Martins Creek Power Plant are described. Information is included on fan design; silencers; mechanical and metallurgical testing; insulation; performance testing; start-up and shutdown procedures; and maintenance. (LCL)

  19. The tongue display unit (TDU) for electrotactile spatiotemporal pattern presentation.

    PubMed

    Kaczmarek, K A

    2011-12-01

    The Tongue Display Unit (TDU) is a 144-channel programmable pulse generator that delivers dc-balanced voltage pulses suitable for electrotactile (electrocutaneous) stimulation of the anterior-dorsal tongue, through a matrix of surface electrodes. This article reviews the theory of operation and a design overview of the TDU, as well as selected applications. These include sensory substitution, tactile information display and neurorehabilitation via induced neuroplasticity.

  20. Woody residues and solid waste wood available for recovery in the United States, 2002

    Treesearch

    David B. McKeever; Robert H. Falk

    2004-01-01

    Large amounts of woody residues and solid wood waste are generated annually in the United States from the extraction of timber from forests, from forestry cultural operations, in the conversion of forest land to nonforest uses, in the initial processing of roundwood timber into usable products, in the construction and demolition of buildings and structures, and in the...

  1. Research of waste heat energy efficiency for absorption heat pump recycling thermal power plant circulating water

    NASA Astrophysics Data System (ADS)

    Zhang, Li; Zhang, Yu; Zhou, Liansheng; E, Zhijun; Wang, Kun; Wang, Ziyue; Li, Guohao; Qu, Bin

    2018-02-01

    The waste heat energy efficiency for absorption heat pump recycling thermal power plant circulating water has been analyzed. After the operation of heat pump, the influences on power generation and heat generation of unit were taken into account. In the light of the characteristics of heat pump in different operation stages, the energy efficiency of heat pump was evaluated comprehensively on both sides of benefits belonging to electricity and benefits belonging to heat, which adopted the method of contrast test. Thus, the reference of energy efficiency for same type projects was provided.

  2. Light Water Reactor Sustainability Program: Integrated Program Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    Nuclear power has safely, reliably, and economically contributed almost 20% of electrical generation in the United States over the past two decades. It remains the single largest contributor (more than 60%) of non-greenhouse-gas-emitting electric power generation in the United States. Domestic demand for electrical energy is expected to grow by about 24% from 2013 to 2040 . At the same time, most of the currently operating nuclear power plants will begin reaching the end of their initial 20-year extension to their original 40-year operating license, for a total of 60 years of operation (the oldest commercial plants in the Unitedmore » States reached their 40th anniversary in 2009). Figure E-1 shows projected nuclear energy contribution to the domestic generating capacity for 40- and 60-year license periods. If current operating nuclear power plants do not operate beyond 60 years (and new nuclear plants are not built quickly enough to replace them), the total fraction of generated electrical energy from nuclear power will rapidly decline. That decline will be accelerated if plants are shut down before 60 years of operation. Decisions on extended operation ultimately rely on economic factors; however, economics can often be improved through technical advancements. The U.S. Department of Energy Office of Nuclear Energy’s 2010 Research and Development Roadmap (2010 Nuclear Energy Roadmap) organizes its activities around four objectives that ensure nuclear energy remains a compelling and viable energy option for the United States. The four objectives are as follows: 1. Develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of the current reactors; 2. Develop improvements in the affordability of new reactors to enable nuclear energy to help meet the Administration’s energy security and climate change goals; 3. Develop sustainable nuclear fuel cycles; and 4. Understand and minimize the risks of nuclear proliferation and terrorism. The Light Water Reactor Sustainability (LWRS) Program is the primary programmatic activity that addresses Objective 1. This document summarizes the LWRS Program’s plans. For the LWRS Program, sustainability is defined as the ability to maintain safe and economic operation of the existing fleet of nuclear power plants for a longer-than-initially-licensed lifetime. It has two facets with respect to long-term operations: (1) manage the aging of plant systems, structures, and components so that nuclear power plant lifetimes can be extended and the plants can continue to operate safely, efficiently, and economically; and (2) provide science-based solutions to the industry to implement technology to exceed the performance of the current labor-intensive business model.« less

  3. 78 FR 45990 - Vogtle Electric Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Change to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ...The U.S. Nuclear Regulatory Commission (NRC) is granting both an exemption to allow a departure from the certification information of Tier 1 of the generic design control document (DCD) and is issuing License Amendment No. 8 to Combined Licenses (COL), NPF-91 and NPF-92. The COLs were issued to Southern Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, Municipal Electric Authority of Georgia, and the City of Dalton, Georgia (the licensee); for construction and operation of the Vogtle Electric Generating Plant (VEGP), Units 3 and 4, located in Burke County, Georgia. The amendment requests to revise the design of the bracing used to support the Turbine Building structure. This request requires changing Tier 1 information found in the Design Description portion of Updated Final Safety Analysis Report (UFSAR) Section 3.3, ``Buildings.'' The granting of the exemption allows the changes to Tier 1 information asked for in the amendment. Because the acceptability of the exemption was determined in part by the acceptability of the amendment, the exemption and amendment are being issued concurrently.

  4. Visualization of the Eastern Renewable Generation Integration Study: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gruchalla, Kenny; Novacheck, Joshua; Bloom, Aaron

    The Eastern Renewable Generation Integration Study (ERGIS), explores the operational impacts of the wide spread adoption of wind and solar photovoltaics (PV) resources in the U.S. Eastern Interconnection and Quebec Interconnection (collectively, EI). In order to understand some of the economic and reliability challenges of managing hundreds of gigawatts of wind and PV generation, we developed state of the art tools, data, and models for simulating power system operations using hourly unit commitment and 5-minute economic dispatch over an entire year. Using NREL's high-performance computing capabilities and new methodologies to model operations, we found that the EI, as simulated withmore » evolutionary change in 2026, could balance the variability and uncertainty of wind and PV at a 5-minute level under a variety of conditions. A large-scale display and a combination of multiple coordinated views and small multiples were used to visually analyze the four large highly multivariate scenarios with high spatial and temporal resolutions. state of the art tools, data, and models for simulating power system operations using hourly unit commitment and 5-minute economic dispatch over an entire year. Using NRELs high-performance computing capabilities and new methodologies to model operations, we found that the EI, as simulated with evolutionary change in 2026, could balance the variability and uncertainty of wind and PV at a 5-minute level under a variety of conditions. A large-scale display and a combination of multiple coordinated views and small multiples were used to visually analyze the four large highly multivariate scenarios with high spatial and temporal resolutions.« less

  5. Review of Variable Generation Integration Charges

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Porter, K.; Fink, S.; Buckley, M.

    2013-03-01

    The growth of wind and solar generation in the United States, and the expectation of continued growth of these technologies, dictates that the future power system will be operated in a somewhat different manner because of increased variability and uncertainty. A small number of balancing authorities have attempted to determine an 'integration cost' to account for these changes to their current operating practices. Some balancing authorities directly charge wind and solar generators for integration charges, whereas others add integration charges to projected costs of wind and solar in integrated resource plans or in competitive solicitations for generation. This report reviewsmore » the balancing authorities that have calculated variable generation integration charges and broadly compares and contrasts the methodologies they used to determine their specific integration charges. The report also profiles each balancing authority and how they derived wind and solar integration charges.« less

  6. Large wind turbines: A utility option for the generation of electricity

    NASA Technical Reports Server (NTRS)

    Robbins, W. H.; Thomas, R. L.; Baldwin, D. H.

    1980-01-01

    The economic and technical potential of wind energy in the United States is discussed. Particular attention is given to the status of wind turbine operational experience as well as the environmental posture of the technology.

  7. 77 FR 31402 - Southern Nuclear Operating Company, Inc.; Vogtle Electric Generating Plant, Units 1 and 2...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-25

    ..., with applicable safety factors applied. Application of the limited hot and cold leg tubesheet...-stamps the document and sends the submitter an email notice confirming receipt of the document. The E...

  8. Operational recovery of turbine No. 3 at Potomac Edison`s Dam No. 4 hydrogenerating facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pelczar, R.S.

    1995-12-31

    The Potomac Edison Dam No. 4 hydroelectric generating station is a historic, turn of the century facility located on the Potomac River near Shepherdstown, West Virginia. The station, originally constructed in 1909, employed twin horizontal Francis hydroturbine generating systems. The systems are unique in that the turbines and generators are offset 37 feet, interconnected by rope and sheaves. In May 1989 a third vertical open flume turbine generating system was added to make use of available site capacity. Both the turbine and speed increaser were the largest products developed by their respective manufacturers for a hydro turbine-generator application. This papermore » will review the subsequent operational experience which led to the original speed increaser failure on unit No. 3 and replacement of the drive system including special design considerations to the replacement speed increaser and its support structure. Specific design challenges included: (1) Designing and implementing a reliable configuration. (2) Reducing operational sound levels. (3) Minimizing harmful structure-borne vibrations which were affecting the internal rotating elements. (4) Incorporating a system brake for emergency and service purposes.« less

  9. Inconel 690 is alloy of choice for steam-generator tubing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Strauss, S.D.

    1996-02-01

    The product of two decades of research and plant application, Inconel 690 promises superior long-term resistance to tube cracking in comparison to alloy 600. Ongoing steam-generator management techniques applied at nuclear pressurized-water-reactor (PWR) plants focus on tube monitoring, inspection, and repair, and on water-chemistry control. Of greatest concern to owner/operators of steam generators (SGs) with recirculating (U-bend) rather than straight through tubes is corrosion of several forms, including pitting, thinning, and cracking. As problems persist and operating and maintenance (O and M) costs become prohibitive, managers must consider the remaining option: complete or partial SG replacement. Although replacement costs canmore » range upward of $100-million, this step restores full-power operation, simplifies inspection, shortens subsequent outages, increases unit availability, and reduces radiation exposure of maintenance personnel. Taken together, these can lead to economies over the long term.« less

  10. GOES-R Atlas V Centaur Lift and Mate

    NASA Image and Video Library

    2016-10-31

    Operations are underway to stack the United Launch Alliance Atlas V Centaur second stage onto the first stage in the Vertical Integration Facility at Space Launch Complex 41 at Cape Canaveral Air Force Station in Florida. The Geostationary Operational Environmental Satellite (GOES-R) will launch aboard the Atlas V rocket in November. GOES-R is the first satellite in a series of next-generation NOAA GOES Satellites.

  11. GOES-R Atlas V Centaur Lift and Mate

    NASA Image and Video Library

    2016-10-31

    United Launch Alliance team members assist as operation begin to lift the Atlas V Centaur second stage into the Vertical Integration Facility at Space Launch Complex 41 at Cape Canaveral Air Force Station in Florida. The Geostationary Operational Environmental Satellite (GOES-R) will launch aboard the Atlas V rocket in November. GOES-R is the first satellite in a series of next-generation NOAA GOES Satellites.

  12. Motor Controller System For Large Dynamic Range of Motor Operation

    NASA Technical Reports Server (NTRS)

    Howard, David E. (Inventor); Alhorn, Dean C. (Inventor); Smith, Dennis A. (Inventor); Dutton, Kenneth R. (Inventor); Paulson, Mitchell Scott (Inventor)

    2006-01-01

    A motor controller system uses a rotary sensor with a plurality of signal conditioning units, coupled to the rotary sensor. Each of these units, which is associated with a particular range of motor output shaft rotation rates, generate a feedback signal indicative of the position of the motor s output shaft. A controller (i) converts a selected motor output shaft rotation rate to a corresponding incremental amount of rotational movement for a selected fixed time period, (ii) selects, at periodic completions of the selected fixed time period, the feedback signal from one of the signal conditioning units for which the particular range of motor output shaft rotation rates associated therewith encompasses the selected motor output shaft rotation rate, and (iii) generates a motor drive signal based on a difference between the incremental amount of rotational movement and the feedback signal from the selected one of the signal conditioning Units.

  13. Test Rack Development for Extended Operation of Advanced Stirling Convertors at NASA Glenn Research Center

    NASA Technical Reports Server (NTRS)

    Dugala, Gina M.

    2010-01-01

    The U.S. Department of Energy, Lockheed Martin Space Systems Company, Sunpower Inc., and NASA Glenn Research Center (GRC) have been developing an Advanced Stirling Radioisotope Generator (ASRG) for use as a power system on space science missions. This generator will make use of free-piston Stirling convertors to achieve higher conversion efficiency than with currently available alternatives. One part of NASA GRC's support of ASRG development includes extended operation testing of Advanced Stirling Convertors (ASCs) developed by Sunpower Inc. and GRC. The ASC consists of a free-piston Stirling engine integrated with a linear alternator. NASA GRC has been building test facilities to support extended operation of the ASCs for several years. Operation of the convertors in the test facility provides convertor performance data over an extended period of time. One part of the test facility is the test rack, which provides a means for data collection, convertor control, and safe operation. Over the years, the test rack requirements have changed. The initial ASC test rack utilized an alternating-current (AC) bus for convertor control; the ASRG Engineering Unit (EU) test rack can operate with AC bus control or with an ASC Control Unit (ACU). A new test rack is being developed to support extended operation of the ASC-E2s with higher standards of documentation, component selection, and assembly practices. This paper discusses the differences among the ASC, ASRG EU, and ASC-E2 test racks.

  14. Design considerations for a LORAN-C timing receiver in a hostile signal to noise environment

    NASA Technical Reports Server (NTRS)

    Porter, J. W.; Bowell, J. R.; Price, G. E.

    1981-01-01

    The environment in which a LORAN-C Timing Receiver may function effectively depends to a large extent on the techniques utilized to insure that interfering signals within the pass band of the unit are neutralized. The baseline performance manually operated timing receivers is discussed and the basic design considerations and necessary parameters for an automatic unit utilizing today's technology are established. Actual performance data is presented comparing the results obtained from a present generation timing receiver against a new generation microprocessor controlled automatic acquisition receiver. The achievements possible in a wide range of signal to noise situations are demonstrated.

  15. Scenarios for Low Carbon and Low Water Electric Power Plant Operations: Implications for Upstream Water Use.

    PubMed

    Dodder, Rebecca S; Barnwell, Jessica T; Yelverton, William H

    2016-11-01

    Electric sector water use, in particular for thermoelectric operations, is a critical component of the water-energy nexus. On a life cycle basis per unit of electricity generated, operational (e.g., cooling system) water use is substantially higher than water demands for the fuel cycle (e.g., natural gas and coal) and power plant manufacturing (e.g., equipment and construction). However, could shifting toward low carbon and low water electric power operations create trade-offs across the electricity life cycle? We compare business-as-usual with scenarios of carbon reductions and water constraints using the MARKet ALlocation (MARKAL) energy system model. Our scenarios show that, for water withdrawals, the trade-offs are minimal: operational water use accounts for over 95% of life cycle withdrawals. For water consumption, however, this analysis identifies potential trade-offs under some scenarios. Nationally, water use for the fuel cycle and power plant manufacturing can reach up to 26% of the total life cycle consumption. In the western United States, nonoperational consumption can even exceed operational demands. In particular, water use for biomass feedstock irrigation and manufacturing/construction of solar power facilities could increase with high deployment. As the United States moves toward lower carbon electric power operations, consideration of shifting water demands can help avoid unintended consequences.

  16. The MSG Central Facility - A Mission Control System for Windows NT

    NASA Astrophysics Data System (ADS)

    Thompson, R.

    The MSG Central Facility, being developed by Science Systems for EUMETSAT1, represents the first of a new generation of satellite mission control systems, based on the Windows NT operating system. The system makes use of a range of new technologies to provide an integrated environment for the planning, scheduling, control and monitoring of the entire Meteosat Second Generation mission. It supports packetised TM/TC and uses Science System's Space UNiT product to provide automated operations support at both Schedule (Timeline) and Procedure levels. Flexible access to historical data is provided through an operations archive based on ORACLE Enterprise Server, hosted on a large RAID array and off-line tape jukebox. Event driven real-time data distribution is based on the CORBA standard. Operations preparation and configuration control tools form a fully integrated element of the system.

  17. 21 CFR 26.40 - Start of the operational period.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... MUTUAL RECOGNITION OF PHARMACEUTICAL GOOD MANUFACTURING PRACTICE REPORTS, MEDICAL DEVICE QUALITY SYSTEM AUDIT REPORTS, AND CERTAIN MEDICAL DEVICE PRODUCT EVALUATION REPORTS: UNITED STATES AND THE EUROPEAN... to quality system evaluation reports and product evaluation reports generated by CAB's listed in...

  18. Utility-Scale Solar 2014. An Empirical Analysis of Project Cost, Performance, and Pricing Trends in the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bolinger, Mark; Seel, Joachim

    2015-09-01

    Other than the nine Solar Energy Generation Systems (“SEGS”) parabolic trough projects built in the 1980s, virtually no large-scale or “utility-scale” solar projects – defined here to include any groundmounted photovoltaic (“PV”), concentrating photovoltaic (“CPV”), or concentrating solar thermal power (“CSP”) project larger than 5 MW AC – existed in the United States prior to 2007. By 2012 – just five years later – utility-scale had become the largest sector of the overall PV market in the United States, a distinction that was repeated in both 2013 and 2014 and that is expected to continue for at least the nextmore » few years. Over this same short period, CSP also experienced a bit of a renaissance in the United States, with a number of large new parabolic trough and power tower systems – some including thermal storage – achieving commercial operation. With this critical mass of new utility-scale projects now online and in some cases having operated for a number of years (generating not only electricity, but also empirical data that can be mined), the rapidly growing utility-scale sector is ripe for analysis. This report, the third edition in an ongoing annual series, meets this need through in-depth, annually updated, data-driven analysis of not just installed project costs or prices – i.e., the traditional realm of solar economics analyses – but also operating costs, capacity factors, and power purchase agreement (“PPA”) prices from a large sample of utility-scale solar projects in the United States. Given its current dominance in the market, utility-scale PV also dominates much of this report, though data from CPV and CSP projects are presented where appropriate.« less

  19. 20. VIEW OF THE INCINERATOR. DURING ROUTINE BUILDING OPERATIONS IN ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. VIEW OF THE INCINERATOR. DURING ROUTINE BUILDING OPERATIONS IN DECEMBER 1988, A HEAT PLUME WAS GENERATED THAT WAS REGISTERED ON FILM BY A PASSING AIRCRAFT. OFFICIALS WITH THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY (USEPA) BELIEVED THAT ILLEGAL OPERATIONS WERE BEING CONDUCTED. THE USEPA USED THIS OPPORTUNITY TO CONVINCE AUTHORITIES TO ISSUE A WARRANT TO ENTER THE ROCKY FLATS PLANT AND INVESTIGATE THE ALLEGATION. (4/98) - Rocky Flats Plant, Plutonium Recovery & Fabrication Facility, North-central section of plant, Golden, Jefferson County, CO

  20. Integrated Stirling Convertor and Hall Thruster Test Conducted

    NASA Technical Reports Server (NTRS)

    Mason, Lee S.

    2002-01-01

    An important aspect of implementing Stirling Radioisotope Generators on future NASA missions is the integration of the generator and controller with potential spacecraft loads. Some recent studies have indicated that the combination of Stirling Radioisotope Generators and electric propulsion devices offer significant trip time and payload fraction benefits for deep space missions. A test was devised to begin to understand the interactions between Stirling generators and electric thrusters. An electrically heated RG- 350 (350-W output) Stirling convertor, designed and built by Stirling Technology Company of Kennewick, Washington, under a NASA Small Business Innovation Research agreement, was coupled to a 300-W SPT-50 Hall-effect thruster built for NASA by the Moscow Aviation Institute (RIAME). The RG-350 and the SPT-50 shown, were installed in adjacent vacuum chamber ports at NASA Glenn Research Center's Electric Propulsion Laboratory, Vacuum Facility 8. The Stirling electrical controller interfaced directly with the Hall thruster power-processing unit, both of which were located outside of the vacuum chamber. The power-processing unit accepted the 48 Vdc output from the Stirling controller and distributed the power to all the loads of the SPT-50, including the magnets, keeper, heater, and discharge. On February 28, 2001, the Glenn test team successfully operated the Hall-effect thruster with the Stirling convertor. This is the world's first known test of a dynamic power source with electric propulsion. The RG-350 successfully managed the transition from the purely resistive load bank within the Stirling controller to the highly capacitive power-processing unit load. At the time of the demonstration, the Stirling convertor was operating at a hot temperature of 530 C and a cold temperature of -6 C. The linear alternator was producing approximately 250 W at 109 Vac, while the power-processing unit was drawing 175 W at 48 Vdc. The majority of power was delivered to the Hall thruster discharge circuit operating at 115 Vdc and 0.9 A. Testing planned for late 2001 will examine the possibility of directly driving the Hall thruster discharge circuit using rectified and filtered output from the Stirling alternator.

  1. Small gas-turbine units for the power industry: Ways for improving the efficiency and the scale of implementation

    NASA Astrophysics Data System (ADS)

    Kosoi, A. S.; Popel', O. S.; Beschastnykh, V. N.; Zeigarnik, Yu. A.; Sinkevich, M. V.

    2017-10-01

    Small power units (<1 MW) see increasing application due to enhanced growth of the distributed power generation and smart power supply systems. They are usually used for feeding facilities whose connection to centralized networks involves certain problems of engineering or economical nature. Small power generation is based on a wide range of processes and primary sources, including renewable and local ones, such as nonconventional hydrocarbon fuel comprising associated gas, biogas, coalmine methane, etc. Characteristics of small gas-turbine units (GTU) that are most widely available on the world market are reviewed. The most promising lines for the development of the new generation of small GTUs are examined. Special emphasis is placed on the three lines selected for improving the efficiency of small GTUs: increasing the fuel efficiency, cutting down the maintenance cost, and integration with local or renewable power sources. It is demonstrated that, as to the specific fuel consumption, small GTUs of the new generation can have an efficiency 20-25% higher than those of the previous generation, require no maintenance between overhauls, and can be capable of efficient integration into intelligent electrical networks with power facilities operating on renewable or local power sources.

  2. Newman Unit 1 advanced solar repowering advanced conceptual design. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1982-04-01

    The Newman Unit 1 solar repowering design is a water/steam central receiver concept supplying superheated steam. The work reported is to develop a refined baseline conceptual design that has potential for construction and operation by 1986, makes use of existing solar thermal technology, and provides the best economics for this application. Trade studies performed in the design effort are described, both for the conceptual design of the overall system and for the subsystem conceptual design. System-level functional requirements, design, operation, performance, cost, safety, environmental, institutional, and regulatory considerations are described. Subsystems described include the collector, receiver, fossil energy, electrical powermore » generating, and master control subsystems, site and site facilities. The conceptual design, cost, and performance of each subsystem is discussed at length. A detailed economic analysis of the repowered unit is made to realistically assess the economics of the first repowered unit using present cost data for a limited production level for solar hardware. Finally, a development plan is given, including the design, procurement, construction, checkout, startup, performance validation, and commercial operation. (LEW)« less

  3. Integrating Solar PV in Utility System Operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mills, A.; Botterud, A.; Wu, J.

    2013-10-31

    This study develops a systematic framework for estimating the increase in operating costs due to uncertainty and variability in renewable resources, uses the framework to quantify the integration costs associated with sub-hourly solar power variability and uncertainty, and shows how changes in system operations may affect these costs. Toward this end, we present a statistical method for estimating the required balancing reserves to maintain system reliability along with a model for commitment and dispatch of the portfolio of thermal and renewable resources at different stages of system operations. We estimate the costs of sub-hourly solar variability, short-term forecast errors, andmore » day-ahead (DA) forecast errors as the difference in production costs between a case with “realistic” PV (i.e., subhourly solar variability and uncertainty are fully included in the modeling) and a case with “well behaved” PV (i.e., PV is assumed to have no sub-hourly variability and can be perfectly forecasted). In addition, we highlight current practices that allow utilities to compensate for the issues encountered at the sub-hourly time frame with increased levels of PV penetration. In this analysis we use the analytical framework to simulate utility operations with increasing deployment of PV in a case study of Arizona Public Service Company (APS), a utility in the southwestern United States. In our analysis, we focus on three processes that are important in understanding the management of PV variability and uncertainty in power system operations. First, we represent the decisions made the day before the operating day through a DA commitment model that relies on imperfect DA forecasts of load and wind as well as PV generation. Second, we represent the decisions made by schedulers in the operating day through hour-ahead (HA) scheduling. Peaking units can be committed or decommitted in the HA schedules and online units can be redispatched using forecasts that are improved relative to DA forecasts, but still imperfect. Finally, we represent decisions within the operating hour by schedulers and transmission system operators as real-time (RT) balancing. We simulate the DA and HA scheduling processes with a detailed unit-commitment (UC) and economic dispatch (ED) optimization model. This model creates a least-cost dispatch and commitment plan for the conventional generating units using forecasts and reserve requirements as inputs. We consider only the generation units and load of the utility in this analysis; we do not consider opportunities to trade power with neighboring utilities. We also do not consider provision of reserves from renewables or from demand-side options. We estimate dynamic reserve requirements in order to meet reliability requirements in the RT operations, considering the uncertainty and variability in load, solar PV, and wind resources. Balancing reserve requirements are based on the 2.5th and 97.5th percentile of 1-min deviations from the HA schedule in a previous year. We then simulate RT deployment of balancing reserves using a separate minute-by-minute simulation of deviations from the HA schedules in the operating year. In the simulations we assume that balancing reserves can be fully deployed in 10 min. The minute-by-minute deviations account for HA forecasting errors and the actual variability of the load, wind, and solar generation. Using these minute-by-minute deviations and deployment of balancing reserves, we evaluate the impact of PV on system reliability through the calculation of the standard reliability metric called Control Performance Standard 2 (CPS2). Broadly speaking, the CPS2 score measures the percentage of 10-min periods in which a balancing area is able to balance supply and demand within a specific threshold. Compliance with the North American Electric Reliability Corporation (NERC) reliability standards requires that the CPS2 score must exceed 90% (i.e., the balancing area must maintain adequate balance for 90% of the 10-min periods). The combination of representing DA forecast errors in the DA commitments, using 1-min PV data to simulate RT balancing, and estimates of reliability performance through the CPS2 metric, all factors that are important to operating systems with increasing amounts of PV, makes this study unique in its scope.« less

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marnay, Chris; Siddiqui, Afzal; Marnay, Chris

    This paper examines a California-based microgrid?s decision to invest in a distributed generation (DG) unit fuelled by natural gas. While the long-term natural gas generation cost is stochastic, we initially assume that the microgrid may purchase electricity at a fixed retail rate from its utility. Using the real options approach, we find a natural gas generation cost threshold that triggers DG investment. Furthermore, the consideration of operational flexibility by the microgrid increases DG investment, while the option to disconnect from the utility is not attractive. By allowing the electricity price to be stochastic, we next determine an investment threshold boundarymore » and find that high electricity price volatility relative to that of natural gas generation cost delays investment while simultaneously increasing the value of the investment. We conclude by using this result to find the implicit option value of the DG unit when two sources of uncertainty exist.« less

  5. The Generation Rate of Respirable Dust from Cutting Fiber Cement Siding Using Different Tools

    PubMed Central

    Qi, Chaolong; Echt, Alan; Gressel, Michael G

    2017-01-01

    This article describes the evaluation of the generation rate of respirable dust (GAPS, defined as the mass of respirable dust generated per unit linear length cut) from cutting fiber cement siding using different tools in a laboratory testing system. We used an aerodynamic particle sizer spectrometer (APS) to continuously monitor the real-time size distributions of the dust throughout cutting tests when using a variety of tools, and calculated the generation rate of respirable dust for each testing condition using the size distribution data. The test result verifies that power shears provided an almost dust-free operation with a GAPS of 0.006 gram meter−1 (g m−1) at the testing condition. For the same power saws, the cuts using saw blades with more teeth generated more respirable dusts. Using the same blade for all four miter saws tested in this study, a positive linear correlation was found between the saws’ blade rotating speed and its dust generation rate. In addition, a circular saw running at the highest blade rotating speed of 9068 RPM generated the greatest amount of dust. All the miter saws generated less dust in the ‘chopping mode’ than in the ‘chopping and sliding’ mode. For the tested saws, GAPS consistently decreased with the increases of the saw cutting feed rate and the number of board in the stack. All the test results point out that fewer cutting interactions between the saw blade’s teeth and the siding board for a unit linear length of cut tend to result in a lower generation rate of respirable dust. These results may help guide optimal operation in practice and future tool development aimed at minimizing dust generation while producing a satisfactory cut. PMID:28395343

  6. The Generation Rate of Respirable Dust from Cutting Fiber Cement Siding Using Different Tools.

    PubMed

    Qi, Chaolong; Echt, Alan; Gressel, Michael G

    2017-03-01

    This article describes the evaluation of the generation rate of respirable dust (GAPS, defined as the mass of respirable dust generated per unit linear length cut) from cutting fiber cement siding using different tools in a laboratory testing system. We used an aerodynamic particle sizer spectrometer (APS) to continuously monitor the real-time size distributions of the dust throughout cutting tests when using a variety of tools, and calculated the generation rate of respirable dust for each testing condition using the size distribution data. The test result verifies that power shears provided an almost dust-free operation with a GAPS of 0.006 g m-1 at the testing condition. For the same power saws, the cuts using saw blades with more teeth generated more respirable dusts. Using the same blade for all four miter saws tested in this study, a positive linear correlation was found between the saws' blade rotating speed and its dust generation rate. In addition, a circular saw running at the highest blade rotating speed of 9068 rpm generated the greatest amount of dust. All the miter saws generated less dust in the 'chopping mode' than in the 'chopping and sliding' mode. For the tested saws, GAPS consistently decreased with the increases of the saw cutting feed rate and the number of board in the stack. All the test results point out that fewer cutting interactions between the saw blade's teeth and the siding board for a unit linear length of cut tend to result in a lower generation rate of respirable dust. These results may help guide optimal operation in practice and future tool development aimed at minimizing dust generation while producing a satisfactory cut. Published by Oxford University Press on behalf of The British Occupational Hygiene Society 2017.

  7. The impact of electric vehicles on the outlook of future energy system

    NASA Astrophysics Data System (ADS)

    Zhuk, A.; Buzoverov, E.

    2018-02-01

    Active promotion of electric vehicles (EVs) and technology of fast EV charging in the medium term may cause significant peak loads on the energy system, what necessitates making strategic decisions related to the development of generating capacities, distribution networks with EV charging infrastructure, and priorities in the development of battery electric vehicles and vehicles with electrochemical generators. The paper analyses one of the most significant aspects of joint development of electric transport system and energy system in the conditions of substantial growth of energy consumption by EVs. The assessments of per-unit-costs of operation and depreciation of EV power unit were made, taking into consideration the expenses of electric power supply. The calculations show that the choice of electricity buffering method for EV fast charging depends on the character of electricity infrastructure in the region where the electric transport is operating. In the conditions of high density of electricity network and a large number of EVs, the stationary storage facilities or the technology of distributed energy storage in EV batteries - vehicle-to-grid (V2G) technology may be used for buffering. In the conditions of low density and low capacity of electricity networks, the most economical solution could be usage of EVs with traction power units based on the combination of air-aluminum electrochemical generator and a buffer battery of small capacity.

  8. Portable light source unit for simulating fires having an adjustable aperture

    NASA Technical Reports Server (NTRS)

    Youngquist, Robert C. (Inventor); Moerk, John S. (Inventor); Strobel, James P. (Inventor)

    1997-01-01

    A portable, hand held light source unit is employed to check operation of fire detectors, such as hydrogen fire detectors. The unit emits radiation in a narrow band of wavelengths which are generated by the type of fire to be tested, but not by other light sources such as the sun or incandescent lamps. The unit can test fire detectors at different distances, and of different sensitivities. The intensity of the radiation emitted by the unit is adjustable for this purpose by means of a rotatable disk having a plurality of different sized apertures for selective placement between the light source and an output lens. The disk can also be rotated to a calibration position which causes a microprocessor circuit in the unit to initiate a calibration procedure. During this procedure, the lamp intensity is measured by a photodetector contained within the unit, and the microprocessor adjusts the lamp current to insure that its intensity remains within a preset range of values. A green and a red LED are mounted on the unit which indicate to an operator whether the calibration is successful, as well as the condition of the unit's battery power supply.

  9. Investigation of a catalytic gas generator for the Space Shuttle APU. [hydrazine Auxiliary Propulsion Unit

    NASA Technical Reports Server (NTRS)

    Emmons, D. L.; Huxtable, D. D.; Blevins, D. R.

    1974-01-01

    An investigation was conducted to establish the capability of a monopropellant hydrazine catalytic gas generator to meet the requirements specified for the Space Shuttle APU. Detailed analytical and experimental studies were conducted on potential problem areas including long-term nitriding effects on materials, design variables affecting catalyst life, vehicle vibration effects, and catalyst oxidation/contamination. A full-scale gas generator, designed to operate at a chamber pressure of 750 psia and a flow rate of 0.36 lbm/sec, was fabricated and subjected to three separate life test series. The objective of the first test series was to demonstrate the capability of the gas generator to successfully complete 20 simulated Space Shuttle missions in steady-state operation. The gas generator was then refurbished and subjected to a second series of tests to demonstrate the pulse-mode capability of the gas generator during 20 simulated missions. The third series of tests was conducted with a refurbished reactor to further demonstrate pulse-mode capability with a modified catalyst bed.

  10. MHD Generating system

    DOEpatents

    Petrick, Michael; Pierson, Edward S.; Schreiner, Felix

    1980-01-01

    According to the present invention, coal combustion gas is the primary working fluid and copper or a copper alloy is the electrodynamic fluid in the MHD generator, thereby eliminating the heat exchangers between the combustor and the liquid-metal MHD working fluids, allowing the use of a conventional coalfired steam bottoming plant, and making the plant simpler, more efficient and cheaper. In operation, the gas and liquid are combined in a mixer and the resulting two-phase mixture enters the MHD generator. The MHD generator acts as a turbine and electric generator in one unit wherein the gas expands, drives the liquid across the magnetic field and thus generates electrical power. The gas and liquid are separated, and the available energy in the gas is recovered before the gas is exhausted to the atmosphere. Where the combustion gas contains sulfur, oxygen is bubbled through a side loop to remove sulfur therefrom as a concentrated stream of sulfur dioxide. The combustor is operated substoichiometrically to control the oxide level in the copper.

  11. Smart nanogrid systems for disaster mitigation employing deployable renewable energy harvesting devices

    NASA Astrophysics Data System (ADS)

    Ghasemi-Nejhad, Mehrdad N.; Menendez, Michael; Minei, Brenden; Wong, Kyle; Gabrick, Caton; Thornton, Matsu; Ghorbani, Reza

    2016-04-01

    This paper explains the development of smart nanogrid systems for disaster mitigation employing deployable renewable energy harvesting, or Deployable Disaster Devices (D3), where wind turbines and solar panels are developed in modular forms, which can be tied together depending on the needed power. The D3 packages/units can be used: (1) as a standalone unit in case of a disaster where no source of power is available, (2) for a remote location such as a farm, camp site, or desert (3) for a community that converts energy usage from fossil fuels to Renewable Energy (RE) sources, or (4) in a community system as a source of renewable energy for grid-tie or off-grid operation. In Smart D3 system, the power is generated (1) for consumer energy needs, (2) charge storage devices (such as batteries, capacitors, etc.), (3) to deliver power to the network when the smart D3 nano-grid is tied to the network and when the power generation is larger than consumption and storage recharge needs, or (4) to draw power from the network when the smart D3 nano-grid is tied to the network and when the power generation is less than consumption and storage recharge needs. The power generated by the Smart D3 systems are routed through high efficiency inverters for proper DC to DC or DC to AC for final use or grid-tie operations. The power delivery from the D3 is 220v AC, 110v AC and 12v DC provide proper power for most electrical and electronic devices worldwide. The power supply is scalable, using a modular system that connects multiple units together. This are facilitated through devices such as external Input-Output or I/O ports. The size of the system can be scaled depending on how many accessory units are connected to the I/O ports on the primary unit. The primary unit is the brain of the system allowing for smart switching and load balancing of power input and smart regulation of power output. The Smart D3 systems are protected by ruggedized weather proof casings allowing for operation in a variety of extreme environments and can be parachuted into the needed locations. The Smart Nanogrid Systems will have sensors that will sense the environmental conditions for the wind turbines and solar panels for maximum energy harvesting as well as identifying the appliances in use. These signal will be sent to a control system to send signal to the energy harvester actuators to maximize the power generation as well as regulating the power, i.e., either send the power to the appliances and consumer devices or send the power to the batteries and capacitors for energy storage, if the power is being generated but there are no consumer appliances in use, making it a "smart nanogrid deployable renewable energy harvesting system."

  12. A New Generation of Electrical Power Supply for Telecom Satellites

    NASA Astrophysics Data System (ADS)

    Bouhours, Gilles; Asplanato, Remi; Rebuffel, Christophe; Pasquet, Jean-Marie; Bardin, Bertrand; Deplus, Nicolas; Lempereur, Vincent

    2014-08-01

    This paper presents the main features of the new power subsystem generation for the Thales Alenia Space (TAS) Spacebus platforms.All its components (Solar Array, Solar Array Drive Mechanism, Power Conditioning Unit and Lithium-Ion batteries) have been upgraded, taking advantage of the latest available technologies. The modularity has been improved to perfectly match the sizing of each unit to the satellite power level requirement. These two improvements lead to optimal mass and cost over the whole power range.In addition, the customer benefits from a fully automatic operation of the subsystem, including redundancy, making the ground station workload negligible, even during eclipse periods. Finally, the capability to support any type of payload has been further improved, in terms of overall power level and operating modes. Payload pulsed operation capability has been especially increased to support all anticipated mission requirements. In parallel to the PCU hardware, a detailed electrical model has also been developed and correlated to analyse the regulation performance in any nominal or degraded mode. An extensive set of tests provides a verification of performances and interfaces, hardware as well as software.This paper will first describe the main requirements considered in this development. Then, the architecture will be detailed, showing how the requirements have been fulfilled. The design of each unit will be shortly presented, and finally the correlation between the regulation analysis model and the EQM measurements will be illustrated.

  13. Modeling and Economic Analysis of Power Grid Operations in a Water Constrained System

    NASA Astrophysics Data System (ADS)

    Zhou, Z.; Xia, Y.; Veselka, T.; Yan, E.; Betrie, G.; Qiu, F.

    2016-12-01

    The power sector is the largest water user in the United States. Depending on the cooling technology employed at a facility, steam-electric power stations withdrawal and consume large amounts of water for each megawatt hour of electricity generated. The amounts are dependent on many factors, including ambient air and water temperatures, cooling technology, etc. Water demands from most economic sectors are typically highest during summertime. For most systems, this coincides with peak electricity demand and consequently a high demand for thermal power plant cooling water. Supplies however are sometimes limited due to seasonal precipitation fluctuations including sporadic droughts that lead to water scarcity. When this occurs there is an impact on both unit commitments and the real-time dispatch. In this work, we model the cooling efficiency of several different types of thermal power generation technologies as a function of power output level and daily temperature profiles. Unit specific relationships are then integrated in a power grid operational model that minimizes total grid production cost while reliably meeting hourly loads. Grid operation is subject to power plant physical constraints, transmission limitations, water availability and environmental constraints such as power plant water exit temperature limits. The model is applied to a standard IEEE-118 bus system under various water availability scenarios. Results show that water availability has a significant impact on power grid economics.

  14. Hybrid robust predictive optimization method of power system dispatch

    DOEpatents

    Chandra, Ramu Sharat [Niskayuna, NY; Liu, Yan [Ballston Lake, NY; Bose, Sumit [Niskayuna, NY; de Bedout, Juan Manuel [West Glenville, NY

    2011-08-02

    A method of power system dispatch control solves power system dispatch problems by integrating a larger variety of generation, load and storage assets, including without limitation, combined heat and power (CHP) units, renewable generation with forecasting, controllable loads, electric, thermal and water energy storage. The method employs a predictive algorithm to dynamically schedule different assets in order to achieve global optimization and maintain the system normal operation.

  15. On the Profitability of Variable Speed Pump-Storage-Power in Frequency Restoration Reserve

    NASA Astrophysics Data System (ADS)

    Filipe, Jorge; Bessa, Ricardo; Moreira, Carlos; Silva, Bernardo

    2017-04-01

    The increase penetration of renewable energy sources (RES) into the European power system has introduced a significant amount of variability and uncertainty in the generation profiles raising the needs for ancillary services as well as other tools like demand response, improved generation forecasting techniques and changes to the market design. While RES is able to replace energy produced by the traditional centralized generation, it cannot displace its capacity in terms of ancillary services provided. Therefore, centralized generation capacity must be retained to perform this function leading to over-capacity issues and underutilisation of the assets. Large-scale reversible hydro power plants represent the majority of the storage solution installed in the power system. This technology comes with high investments costs, hence the constant search for methods to increase and diversify the sources of revenue. Traditional fixed speed pump storage units typically operate in the day-ahead market to perform price arbitrage and, in some specific cases, provide downward replacement reserve (RR). Variable speed pump storage can not only participate in RR but also contribute to FRR, given their ability to control its operating point in pumping mode. This work does an extended analysis of a complete bidding strategy for Pumped Storage Power, enhancing the economic advantages of variable speed pump units in comparison with fixed ones.

  16. Assessment of microwave-based clinical waste decontamination unit.

    PubMed

    Hoffman, P N; Hanley, M J

    1994-12-01

    A clinical waste decontamination unit that used microwave-generated heat was assessed for operator safety and efficacy. Tests with loads artificially contaminated with aerosol-forming particles showed that no particles were detected outside the machine provided the seals and covers were correctly seated. Thermometric measurement of a self-generated steam decontamination cycle was used to determine the parameters needed to ensure heat disinfection of the waste reception hopper, prior to entry for maintenance or repair. Bacterial and thermometric test pieces were passed through the machine within a full load of clinical waste. These test pieces, designed to represent a worst case situation, were enclosed in aluminium foil to shield them from direct microwave energy. None of the 100 bacterial test pieces yielded growth on culture and all 100 thermal test pieces achieved temperatures in excess of 99 degrees C during their passage through the decontamination unit. It was concluded that this method may be used to render safe the bulk of of ward-generated clinical waste.

  17. OGS Maintenance

    NASA Image and Video Library

    2010-07-21

    ISS024-E-009246 (21 July 2010) --- NASA astronaut Tracy Caldwell Dyson, Expedition 24 flight engineer, is pictured during troubleshooting operations of the Oxygen Generator System (OGS) hardware and replacement of an H2 (hydrogen) Dome Orbit Replaceable Unit (ORU) in the Destiny laboratory of the International Space Station.

  18. 40 CFR 52.1923 - Best Available Retrofit Requirements (BART) for SO2 and Interstate pollutant transport provisions...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... combusted at any time at the steam generating unit. Daily average means the arithmetic average of the hourly... which may include, but is not limited to, monitoring results, review of operating and maintenance...

  19. Fuel consumption of ADS-B and non-ADS-B helicopter operation in the Gulf of Mexico

    DOT National Transportation Integrated Search

    2013-07-01

    Automatic Dependent Surveillance Broadcast (ADSB) is a key enabling technology for the Next Generation Air Transportation System (NextGen) in the United States. The NextGen system replaces the current ground based commandandcontrol syste...

  20. 78 FR 46617 - Vogtle Electric Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Change to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-01

    ...-92, issued to the licensee. The exemption is required by Paragraph A.4 of Section VIII, ``Processes... reduction in standardization caused by the exemption; and F. The exemption will not result in a significant...

  1. 77 FR 62539 - Sunshine Federal Register Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-15

    ... NUCLEAR REGULATORY COMMISSION Sunshine Federal Register Notice AGENCY HOLDING THE MEETINGS: Nuclear Regulatory Commission [NRC-2012- 0002]. DATE: Weeks of October 8, 15, 22, 29, November 5, 12, 19... Meeting) (Tentative) a. Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3...

  2. On Orbit ISS Oxygen Generation System Operation Status

    NASA Technical Reports Server (NTRS)

    Diderich, Greg S.; Polis, Pete; VanKeuren, Steven P.; Erickson, Robert; Mason, Richard

    2011-01-01

    The International Space Station (ISS) United States Orbital Segment (USOS) Oxygen Generation System (OGS) has accumulated almost a year of operation at varied oxygen production rates within the US Laboratory Module (LAB) since it was first activated in July 2007. It was operated intermittently through 2009 and 2010, due to filter clogging and acid accumulation in the recirculation loop. Since the installation of a deionizing bed in the recirculation loop in May of 2011 the OGA has been operated continuously. Filters in the recirculation loop have clogged and have been replaced. Hydrogen sensors have drifted apart, and a power failure may have condensed water on a hydrogen sensor. A pump delta pressure sensor failed, and a replacement new spare pump failed to start. Finally, the voltage across the cell stack increased out of tolerance due to cation contamination, and the cell stack was replaced. This paper will discuss the operating experience and characteristics of the OGS, as well as operational issues and their resolution.

  3. Apollo experience report guidance and control systems: Lunar module abort guidance system

    NASA Technical Reports Server (NTRS)

    Kurten, P. M.

    1975-01-01

    The history of a unique development program that produced an operational fixed guidance system of inertial quality is presented. Each phase of development, beginning with requirement definition and concluding with qualification and testing, is addressed, and developmental problems are emphasized. Software generation and mission operations are described, and specifications for the inertial reference unit are included, as are flight performance results. Significant program observations are noted.

  4. Layouts of trigeneration plants for centralized power supply

    NASA Astrophysics Data System (ADS)

    Klimenko, A. V.; Agababov, V. S.; Il'ina, I. P.; Rozhnatovskii, V. D.; Burmakina, A. V.

    2016-06-01

    One of the possible and, under certain conditions, sufficiently effective methods for reducing consumption of fuel and energy resources is the development of plants for combined generation of different kinds of energy. In the power industry of Russia, the facilities have become widespread in which the cogeneration technology, i.e., simultaneous generation of electric energy and heat, is implemented. Such facilities can use different plants, viz., gas- and steam-turbine plants and gas-reciprocating units. Cogeneration power supply can be further developed by simultaneously supplying the users not only with electricity and heat but also with cold. Such a technology is referred to as trigeneration. To produce electricity and heat, trigeneration plants can use the same facilities that are used in cogeneration, namely, gas-turbine plants, steam-turbine plants, and gas-reciprocating units. Cold can be produced in trigeneration plants using thermotransformers of various kinds, such as vaporcompression thermotransformers, air thermotransformers, and absorption thermotransformers, that operate as chilling machines. The thermotransformers can also be used in the trigeneration plants to generate heat. The main advantage of trigeneration plants based on gas-turbine plants or gas-reciprocating units over cogeneration plants is the increased thermodynamic power supply efficiency owing to utilization of the waste-gas heat not only in winter but also in summer. In the steam-turbine-based trigeneration plants equipped with absorption thermotransformers, the enhancement of the thermodynamic power supply efficiency is determined by the increase in the heat extraction load during the nonheating season. The article presents calculated results that demonstrate higher thermodynamic efficiency of a gas-turbine-based plant with an absorption thermotransformer that operates in the trigeneration mode compared with a cogeneration gas-turbine plant. The structural arrangements of trigeneration plants designed to supply electricity, heat, and cold to the users are shown and the principles of their operation are described. The article presents results of qualitative analysis of different engineering solutions applied to select one combination of power- and heat-generating equipment and thermotransformers or another.

  5. The Oak Ridge Competitive Electricity Dispatch (ORCED) Model Version 9

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hadley, Stanton W.; Baek, Young Sun

    The Oak Ridge Competitive Electricity Dispatch (ORCED) model dispatches power plants in a region to meet the electricity demands for any single given year up to 2030. It uses publicly available sources of data describing electric power units such as the National Energy Modeling System and hourly demands from utility submittals to the Federal Energy Regulatory Commission that are projected to a future year. The model simulates a single region of the country for a given year, matching generation to demands and predefined net exports from the region, assuming no transmission constraints within the region. ORCED can calculate a numbermore » of key financial and operating parameters for generating units and regional market outputs including average and marginal prices, air emissions, and generation adequacy. By running the model with and without changes such as generation plants, fuel prices, emission costs, plug-in hybrid electric vehicles, distributed generation, or demand response, the marginal impact of these changes can be found.« less

  6. Combustion systems and power plants incorporating parallel carbon dioxide capture and sweep-based membrane separation units to remove carbon dioxide from combustion gases

    DOEpatents

    Wijmans, Johannes G [Menlo Park, CA; Merkel, Timothy C [Menlo Park, CA; Baker, Richard W [Palo Alto, CA

    2011-10-11

    Disclosed herein are combustion systems and power plants that incorporate sweep-based membrane separation units to remove carbon dioxide from combustion gases. In its most basic embodiment, the invention is a combustion system that includes three discrete units: a combustion unit, a carbon dioxide capture unit, and a sweep-based membrane separation unit. In a preferred embodiment, the invention is a power plant including a combustion unit, a power generation system, a carbon dioxide capture unit, and a sweep-based membrane separation unit. In both of these embodiments, the carbon dioxide capture unit and the sweep-based membrane separation unit are configured to be operated in parallel, by which we mean that each unit is adapted to receive exhaust gases from the combustion unit without such gases first passing through the other unit.

  7. American Recovery & Reinvestment Act: Fuel Cell Hybrid Power Packs and Hydrogen Refueling for Lift Trucks

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Block, Gus

    2011-07-31

    HEB Grocery Company, Inc. (H-E-B) is a privately-held supermarket chain with 310 stores throughout Texas and northern Mexico. H-E-B converted 14 of its lift reach trucks to fuel cell power using Nuvera Fuel Cells’ PowerEdge™ units to verify the value proposition and environmental benefits associated with the technology. Issues associated with the increasing power requirements of the distribution center operation, along with high ambient temperature in the summer and other operating conditions (such as air quality and floor surface condition), surfaced opportunities for improving Nuvera’s PowerEdge fuel cell system design in high-throughput forklift environments. The project included on-site generation ofmore » hydrogen from a steam methane reformer, called PowerTap™ manufactured by Nuvera. The hydrogen was generated, compressed and stored in equipment located outside H-E-B’s facility, and provided to the forklifts by hydrogen dispensers located in high forklift traffic areas. The PowerEdge fuel cell units logged over 25,300 operating hours over the course of the two-year project period. The PowerTap hydrogen generator produced more than 11,100 kg of hydrogen over the same period. Hydrogen availability at the pump was 99.9%. H-E-B management has determined that fuel cell forklifts help alleviate several issues in its distribution centers, including truck operator downtime associated with battery changing, truck and battery maintenance costs, and reduction of grid electricity usage. Data collected from this initial installation demonstrated a 10% productivity improvement, which enabled H-E-B to make economic decisions on expanding the fleet of PowerEdge and PowerTap units in the fleet, which it plans to undertake upon successful demonstration of the new PowerEdge reach truck product. H-E-B has also expressed interst in other uses of hydrogen produced on site in the future, such as for APUs used in tractor trailers and refrigerated transport trucks in its fleet.« less

  8. Fresh-Frozen Plasma: Ordering Patterns and Utilization in the Operating Rooms of a Tertiary Referral Hospital.

    PubMed

    Meyer, Matthew J; Dzik, Walter H; Levine, Wilton C

    2017-02-01

    Blood product transfusion is the most commonly performed hospital procedure. Intraoperative blood product utilization varies between institutions and anesthesiologists. In the United States in 2011, nearly 4 million plasma units were transfused. A retrospective analysis of intraoperative plasma ordering patterns and utilization (thawing and transfusing) was performed at a tertiary, academic hospital between January 2015 and March 2016. Over 15 months, 46,002 operative procedures were performed. In 1540 of them, plasma was thawed or transfused: 8297 plasma units were thawed and 3306 of those units were transfused. These 3306 plasma units were transfused in 749 cases with a median of 2 plasma units (interquartile range, 2-4) transfused. The percentage of average monthly procedures with plasma thawed and none transfused was 51.3% (confidence interval, 49.0%-53.6%). The cardiac surgery service requested the greatest number of plasma units to be thawed (2143) but only transfused 712 (33.2%) of them. Of all plasma units not transfused, 45% were generated by procedures with 1 to 4 units of plasma thawed; 95.7% of these units were thawed as even integers (ie, 2, 4). For operative procedures, far more plasma was thawed than was transfused and this practice occurred across surgical specialties and anesthesiologists. Considering the plasma that was not transfused, 45% occurred in procedures with 4 or fewer units of plasma requested suggesting these low-volume requests were a primary source of potential waste. Further studies are needed to examine associations between plasma utilization and clinical outcomes.

  9. Method and apparatus to debug an integrated circuit chip via synchronous clock stop and scan

    DOEpatents

    Bellofatto, Ralph E [Ridgefield, CT; Ellavsky, Matthew R [Rochester, MN; Gara, Alan G [Mount Kisco, NY; Giampapa, Mark E [Irvington, NY; Gooding, Thomas M [Rochester, MN; Haring, Rudolf A [Cortlandt Manor, NY; Hehenberger, Lance G [Leander, TX; Ohmacht, Martin [Yorktown Heights, NY

    2012-03-20

    An apparatus and method for evaluating a state of an electronic or integrated circuit (IC), each IC including one or more processor elements for controlling operations of IC sub-units, and each the IC supporting multiple frequency clock domains. The method comprises: generating a synchronized set of enable signals in correspondence with one or more IC sub-units for starting operation of one or more IC sub-units according to a determined timing configuration; counting, in response to one signal of the synchronized set of enable signals, a number of main processor IC clock cycles; and, upon attaining a desired clock cycle number, generating a stop signal for each unique frequency clock domain to synchronously stop a functional clock for each respective frequency clock domain; and, upon synchronously stopping all on-chip functional clocks on all frequency clock domains in a deterministic fashion, scanning out data values at a desired IC chip state. The apparatus and methodology enables construction of a cycle-by-cycle view of any part of the state of a running IC chip, using a combination of on-chip circuitry and software.

  10. Economics of hydrogen production and liquefaction updated to 1980

    NASA Technical Reports Server (NTRS)

    Baker, C. R.

    1979-01-01

    Revised costs for generating and liquefying hydrogen in mid-1980 are presented. Plant investments were treated as straight-forward escalations resulting from inflation. Operating costs, however, were derived in terms of the unit cost of coal, fuel gas and electrical energy to permit the determination of the influence of these parameters on the cost of liquid hydrogen. Inflationary influence was recognized by requiring a 15% discounted rate of return on investment for Discounted Cash Flow financing analysis, up from 12% previously. Utility financing was revised to require an 11% interest rate on debt. The scope of operation of the hydrogen plant was revised from previous studies to include only the hydrogen generation and liquefaction facilities. On-site fuel gas and power generation, originally a part of the plant complex, was eliminated. Fuel gas and power are now treated as purchased utilities. Costs for on-site generation of fuel gas however, are included.

  11. A diesel fuel processor for fuel-cell-based auxiliary power unit applications

    NASA Astrophysics Data System (ADS)

    Samsun, Remzi Can; Krekel, Daniel; Pasel, Joachim; Prawitz, Matthias; Peters, Ralf; Stolten, Detlef

    2017-07-01

    Producing a hydrogen-rich gas from diesel fuel enables the efficient generation of electricity in a fuel-cell-based auxiliary power unit. In recent years, significant progress has been achieved in diesel reforming. One issue encountered is the stable operation of water-gas shift reactors with real reformates. A new fuel processor is developed using a commercial shift catalyst. The system is operated using optimized start-up and shut-down strategies. Experiments with diesel and kerosene fuels show slight performance drops in the shift reactor during continuous operation for 100 h. CO concentrations much lower than the target value are achieved during system operation in auxiliary power unit mode at partial loads of up to 60%. The regeneration leads to full recovery of the shift activity. Finally, a new operation strategy is developed whereby the gas hourly space velocity of the shift stages is re-designed. This strategy is validated using different diesel and kerosene fuels, showing a maximum CO concentration of 1.5% at the fuel processor outlet under extreme conditions, which can be tolerated by a high-temperature PEFC. The proposed operation strategy solves the issue of strong performance drop in the shift reactor and makes this technology available for reducing emissions in the transportation sector.

  12. Distributed and recoverable digital control system

    NASA Technical Reports Server (NTRS)

    Stange, Kent (Inventor); Hess, Richard (Inventor); Kelley, Gerald B (Inventor); Rogers, Randy (Inventor)

    2010-01-01

    A real-time multi-tasking digital control system with rapid recovery capability is disclosed. The control system includes a plurality of computing units comprising a plurality of redundant processing units, with each of the processing units configured to generate one or more redundant control commands. One or more internal monitors are employed for detecting data errors in the control commands. One or more recovery triggers are provided for initiating rapid recovery of a processing unit if data errors are detected. The control system also includes a plurality of actuator control units each in operative communication with the computing units. The actuator control units are configured to initiate a rapid recovery if data errors are detected in one or more of the processing units. A plurality of smart actuators communicates with the actuator control units, and a plurality of redundant sensors communicates with the computing units.

  13. Liquid lift for the Shuttle

    NASA Astrophysics Data System (ADS)

    Demeis, Richard

    1989-02-01

    After the operational failure of a Solid Rocket Booster (SRB) led to the Space Shuttle Challenger accident, NASA reexamined the use of liquid-fueled units in place of the SRBs in order to ascertain whether they could improve safety and payload. In view of favorable study results obtained, the posibility has arisen of employing a common liquid rocket booster for the Space Shuttle, its cargo version ('Shuttle-C'), and the next-generation Advanced Launch System. The system envisioned would involve two booster units, whose four engines/unit would be fed by integral LOX and kerosene tanks. Mission aborts with one-booster unit and two-unit failures would not be catastrophic, and would respectively allow LEO or an emergency landing in Africa.

  14. Testing the system detection unit for measuring solid minerals bulk density

    NASA Astrophysics Data System (ADS)

    Voytyuk, I. N.; Kopteva, A. V.

    2017-10-01

    The paper provides a brief description of the system for measuring flux per volume of solid minerals via example of mineral coal. The paper discloses the operational principle of the detection unit. The paper provides full description of testing methodology, as well as practical implementation of the detection unit testing. This paper describes the removal of two data arrays via the channel of scattered anddirect radiation for the detection units of two generations. This paper describes Matlab software to determine the statistical characteristics of the studied objects. The mean value of pulses per cycles, and pulse counting inaccuracy relatively the mean value were determined for the calculation of the stability account of the detection units.

  15. Automated Coal-Mine Shuttle Car

    NASA Technical Reports Server (NTRS)

    Collins, E. R., Jr.

    1984-01-01

    Cable-guided car increases efficiency in underground coal mines. Unmanned vehicle contains storage batteries in side panels for driving traction motors located in wheels. Batteries recharged during inactive periods or slid out as unit and replaced by fresh battery bank. Onboard generator charges batteries as car operates.

  16. LIME SPRAY DRYER FLUE GAS DESULFURIZATION COMPUTER MODEL USERS MANUAL

    EPA Science Inventory

    The report describes a lime spray dryer/baghouse (FORTRAN) computer model that simulates SO2 removal and permits study of related impacts on design and economics as functions of design parameters and operating conditions for coal-fired electric generating units. The model allows ...

  17. Experimental design, operation, and results of a 4 kW high temperature steam electrolysis experiment

    DOE PAGES

    Zhang, Xiaoyu; O'Brien, James E.; Tao, Greg; ...

    2015-08-06

    High temperature steam electrolysis (HTSE) is a promising technology for large-scale hydrogen production. However, research on HTSE performance above the kW level is limited. This paper presents the results of 4 kW HTSE long-term test completed in a multi-kW test facility recently developed at the Idaho National Laboratory (INL). The 4 kW HTSE unit included two solid oxide electrolysis stacks operating in parallel, each of which included 40 electrode-supported planar cells. A current density of 0.41 A/cm2 was used for the long-term operation, resulting in a hydrogen production rate about 25 slpm. A demonstration of 920 hours stable operation wasmore » achieved. The paper also includes detailed descriptions of the piping layout, steam generation and delivery system, test fixture, heat recuperation system, hot zone, instrumentation, and operating conditions. As a result, this successful demonstration of multi-kW scale HTSE unit will help to advance the technology toward near-term commercialization.« less

  18. Admiralty Inlet Pilot Tidal Project Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Collar, Craig

    This document represents the final report for the Admiralty Inlet Pilot Tidal Project, located in Puget Sound, Washington, United States. The Project purpose was to license, permit, and install a grid-connected deep-water tidal turbine array (two turbines) to be used as a platform to gather operational and environmental data on tidal energy generation. The data could then be used to better inform the viability of commercial tidal energy generation from technical, economic, social, and environmental standpoints. This data would serve as a critical step towards the responsible advancement of commercial scale tidal energy in the United States and around themore » world. In late 2014, Project activities were discontinued due to escalating costs, and the DOE award was terminated in early 2015. Permitting, licensing, and engineering design activities were completed under this award. Final design, deployment, operation, and monitoring were not completed. This report discusses the results and accomplishments achieved under the subject award.« less

  19. ALARA Council: Sharing our resources and experiences to reduce doses at Commonwealth Edison Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rescek, F.

    1995-03-01

    Commonwealth Edison Company is an investor-owned utility company supplying electricity to over three million customers (eight million people) in Chicago and northern Illinois, USA. The company operates 16 generating stations which have the capacity to produce 22,522 megawatts of electricity. Six of these generating stations, containing 12 nuclear units, supply 51% of this capacity. The 12 nuclear units are comprised of four General Electric boiling water (BWR-3) reactors, two General Electric BWR-5 reactors, and six Westinghouse four-loop pressurized water reactors (PWR). In August 1993, Commonwealth Edison created an ALARA Council with the responsibility to provide leadership and guidance that resultsmore » in an effective ALARA Culture within the Nuclear Operations Division. Unlike its predecessor, the Corporate ALARA Committee, the ALARA Council is designed to bring together senior managers from the six nuclear stations and corporate to create a collaborative effort to reduce occupational doses at Commonwealth Edison`s stations.« less

  20. Nuclear power plant 5,000 to 10,000 kilowatts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The purpose of this proposal is to present a suggested program for the development of an Aqueous Homogeneous Reactor Power Plant for the production of power in the 5000 to 10,000 kilowatt range under the terms of the Atomic Energy Commission's invitation of September 21, 1955. It envisions a research and development program prior to finalizing fabricating commitments of full scale components for the purpose of proving mechanical and hydraulic operating and chemical processing feasibility with the expectation that such preliminary effort will assure the contruction of the reactor at the lowest cost and successful operation at the earliest date.more » It proposes the construction of a reactor for an eventual net electrical output of ten megawatts but initially in conjunction with a five megawatt turbo-generating unit. This unit would be constructed at the site of the existing Hersey diesel generating plant of the Wolverine Electric Cooperative approximately ten miles north of Big Rapids, Michigan.« less

  1. Analysis of integrated photovoltaic-thermal systems using solar concentrators

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yusoff, M.B.

    1983-01-01

    An integrated photovoltaic-thermal system using solar concentrators utilizes the solar radiation spectrum in the production of electrical and thermal energy. The electrical conversion efficiency of this system decreases with increasing solar cell temperature. Since a high operating temperature is desirable to maximize the quality of thermal output of the planned integrated system, a proper choice of the operating temperature for the unit cell is of vital importance. The analysis predicts performance characteristics of the unit cell by considering the dependence of the heat generation, the heat absorption and the heat transmission on the material properties of the unit cell structure.more » An analytical model has been developed to describe the heat transport phenomena occurring in the unit cell structure. The range of applicability of the one-dimensional and the two-dimensional models, which have closed-form solutions, has been demonstrated. Parametric and design studies point out the requirements for necessary good electrical and thermal performance. A procedure utilizing functional forms of component characteristics in the form of partial coefficients of the dependent variable has been developed to design and operate the integrated system to have a desirable value of the thermal to electrical output ratio both at design and operating modes.« less

  2. System for operating solid oxide fuel cell generator on diesel fuel

    NASA Technical Reports Server (NTRS)

    Singh, Prabhu (Inventor); George, Raymond A. (Inventor)

    1997-01-01

    A system is provided for operating a solid oxide fuel cell generator on diesel fuel. The system includes a hydrodesulfurizer which reduces the sulfur content of commercial and military grade diesel fuel to an acceptable level. Hydrogen which has been previously separated from the process stream is mixed with diesel fuel at low pressure. The diesel/hydrogen mixture is then pressurized and introduced into the hydrodesulfurizer. The hydrodesulfurizer comprises a metal oxide such as ZnO which reacts with hydrogen sulfide in the presence of a metal catalyst to form a metal sulfide and water. After desulfurization, the diesel fuel is reformed and delivered to a hydrogen separator which removes most of the hydrogen from the reformed fuel prior to introduction into a solid oxide fuel cell generator. The separated hydrogen is then selectively delivered to the diesel/hydrogen mixer or to a hydrogen storage unit. The hydrogen storage unit preferably comprises a metal hydride which stores hydrogen in solid form at low pressure. Hydrogen may be discharged from the metal hydride to the diesel/hydrogen mixture at low pressure upon demand, particularly during start-up and shut-down of the system.

  3. A Real-Time Phase Vector Display for EEG Monitoring

    NASA Technical Reports Server (NTRS)

    Finger, Herbert J.; Anliker, James E.; Rimmer, Tamara

    1973-01-01

    A real-time, computer-based, phase vector display system has been developed which will output a vector whose phase is equal to the delay between a trigger and the peak of a function which is quasi-coherent with respect to the trigger. The system also contains a sliding averager which enables the operator to average successive trials before calculating the phase vector. Data collection, averaging and display generation are performed on a LINC-8 computer. Output displays appear on several X-Y CRT display units and on a kymograph camera/oscilloscope unit which is used to generate photographs of time-varying phase vectors or contourograms of time-varying averages of input functions.

  4. Exergy analysis of biomass organic Rankine cycle for power generation

    NASA Astrophysics Data System (ADS)

    Nur, T. B.; Sunoto

    2018-02-01

    The study examines proposed small biomass-fed Organic Rankine Cycle (ORC) power plant through exergy analysis. The system consists of combustion burner unit to utilize biomass as fuel, and organic Rankine cycle unit to produce power from the expander. The heat from combustion burner was transfered by thermal oil heater to evaporate ORC working fluid in the evaporator part. The effects of adding recuperator into exergy destruction were investigated. Furthermore, the results of the variations of system configurations with different operating parameters, such as the evaporating pressures, ambient temperatures, and expander pressures were analyzed. It was found that the largest exergy destruction occurs during processes are at combustion part, followed by evaporator, condenser, expander, and pump. The ORC system equipped with a recuperator unit exhibited good operational characteristics under wide range conditions compared to the one without recuperator.

  5. Safe disposal of radionuclides in low-level radioactive-waste repository sites; Low-level radioactive-waste disposal workshop, U.S. Geological Survey, July 11-16, 1987, Big Bear Lake, Calif., Proceedings

    USGS Publications Warehouse

    Bedinger, Marion S.; Stevens, Peter R.

    1990-01-01

    In the United States, low-level radioactive waste is disposed by shallow-land burial. Low-level radioactive waste generated by non-Federal facilities has been buried at six commercially operated sites; low-level radioactive waste generated by Federal facilities has been buried at eight major and several minor Federally operated sites (fig. 1). Generally, low-level radioactive waste is somewhat imprecisely defined as waste that does not fit the definition of high-level radioactive waste and does not exceed 100 nCi/g in the concentration of transuranic elements. Most low-level radioactive waste generated by non-Federal facilities is generated at nuclear powerplants; the remainder is generated primarily at research laboratories, hospitals, industrial facilities, and universities. On the basis of half lives and concentrations of radionuclides in low-level radioactive waste, the hazard associated with burial of such waste generally lasts for about 500 years. Studies made at several of the commercially and Federally operated low-level radioactive-waste repository sites indicate that some of these sites have not provided containment of waste nor the expected protection of the environment.

  6. Microbial communities associated with wet flue gas desulfurization systems

    PubMed Central

    Brown, Bryan P.; Brown, Shannon R.; Senko, John M.

    2012-01-01

    Flue gas desulfurization (FGD) systems are employed to remove SOx gasses that are produced by the combustion of coal for electric power generation, and consequently limit acid rain associated with these activities. Wet FGDs represent a physicochemically extreme environment due to the high operating temperatures and total dissolved solids (TDS) of fluids in the interior of the FGD units. Despite the potential importance of microbial activities in the performance and operation of FGD systems, the microbial communities associated with them have not been evaluated. Microbial communities associated with distinct process points of FGD systems at several coal-fired electricity generation facilities were evaluated using culture-dependent and -independent approaches. Due to the high solute concentrations and temperatures in the FGD absorber units, culturable halothermophilic/tolerant bacteria were more abundant in samples collected from within the absorber units than in samples collected from the makeup waters that are used to replenish fluids inside the absorber units. Evaluation of bacterial 16S rRNA genes recovered from scale deposits on the walls of absorber units revealed that the microbial communities associated with these deposits are primarily composed of thermophilic bacterial lineages. These findings suggest that unique microbial communities develop in FGD systems in response to physicochemical characteristics of the different process points within the systems. The activities of the thermophilic microbial communities that develop within scale deposits could play a role in the corrosion of steel structures in FGD systems. PMID:23226147

  7. Improving Energy Security for Air Force Installations

    DTIC Science & Technology

    2015-09-01

    Wind power is a mature technology, with wind turbines first being used for electricity in the late 19th century. The Air Force operates two wind ...company, and the military unit receives energy credits back on its bill. Two concepts are important when considering the turbine size for a wind ...generation and consumption must remain balanced for a grid, so wind turbines are rarely used as a sole energy source since power is only generated

  8. Life cycle assessment of coal-fired power plants and sensitivity analysis of CO2 emissions from power generation side

    NASA Astrophysics Data System (ADS)

    Yin, Libao; Liao, Yanfen; Zhou, Lianjie; Wang, Zhao; Ma, Xiaoqian

    2017-05-01

    The life cycle assessment and environmental impacts of a 1000MW coal-fired power plant were carried out in this paper. The results showed that the operation energy consumption and pollutant emission of the power plant are the highest in all sub-process, which accounts for 93.93% of the total energy consumption and 92.20% of the total emission. Compared to other pollutant emissions from the coal-fired power plant, CO2 reached up to 99.28%. Therefore, the control of CO2 emission from the coal-fired power plants was very important. Based on the BP neural network, the amount of CO2 emission from the generation side of coal-fired power plants was calculated via carbon balance method. The results showed that unit capacity, coal quality and unit operation load had great influence on the CO2 emission from coal-fired power plants in Guangdong Province. The use of high volatile and high heat value of coal also can reduce the CO2 emissions. What’s more, under higher operation load condition, the CO2 emissions of 1 kWh electric energy was less.

  9. The potential uses of operational earthquake forecasting

    USGS Publications Warehouse

    Field, Edward; Jordan, Thomas; Jones, Lucille M.; Michael, Andrew; Blanpied, Michael L.

    2016-01-01

    This article reports on a workshop held to explore the potential uses of operational earthquake forecasting (OEF). We discuss the current status of OEF in the United States and elsewhere, the types of products that could be generated, the various potential users and uses of OEF, and the need for carefully crafted communication protocols. Although operationalization challenges remain, there was clear consensus among the stakeholders at the workshop that OEF could be useful.

  10. Peace Operations in Africa: Lessons Learned Since 2000 (Africa Security Brief, Number 25, July 2013)

    DTIC Science & Technology

    2013-07-01

    many more, leaving them to run the gauntlet of vio- lence, disease, and malnutrition . Such violence has also traumatized a generation of children and...capabilities, field intelligence , and formed police units12 as well as special forces. To this list should be added the general need for more...peacekeepers with good intelligence . Operations perceived as illegitimate will struggle on both counts, as AMISOM, MINURCAT, and MONUSCO have all

  11. Final Environmental Statement. Continental United States Over-the- Horizon Backscatter Radar System

    DTIC Science & Technology

    1975-01-01

    plants will be provided only for the operational radar system. When operating they will emit diesel exhaust fumes into the atmosphere. g. Noise...Pollution. Noise will be generated when the standby power plants are used. h. Foliage and Soil. The clearing of trees and shrubs in the...building, a 12 megawatt standby power plant , a gate house, transmit antennas, connection to commercial power lines, a paved access road, a well water

  12. Translations on Eastern Europe, Scientific Affairs. Number 605

    DTIC Science & Technology

    1978-11-01

    Organization Rep:. No. 10. Project/Task/ Worle Unit No. 11. Contract/Grant No. 13. Type of Report & Period Covered 14. 15. Supplementary Notes 16...between the two in- stitutes. It began during the second half of the fifties when the first experimental nuclear reactor was put into operation in...progress on a fourth generation whose speeds could attain several hundred millions, and even several billions, of operations per second , and the larger

  13. Ferrite Research Aimed at Improving Induction Linac Driven FEL performance. Phase 2

    DTIC Science & Technology

    1992-10-01

    energy costs and decrease our dependence on foreign energy sources. SO 2 control has used flue gas desulfurization scrubbers after combustion, coal...minimizing operating costs. . Dry Mode of Operation Conventional flue - gas treatment processes are generally wet systems which generate waste water and wet ...energy source in the United States. So reducing the SO 2 and NOx emission from flue gas will allow use of abundant, high-sulphur coal resources, lower

  14. Other Than War: The American Military Experience and Operations in the Post-Cold War Decade

    DTIC Science & Technology

    2013-01-01

    drugs" did not seem to legitimize the en - terprise within the military services that viewed counter-drug operations as outside the normal scope of their... immigration generated considerable work for United States Southern Command was head- quartered first in Panama and by the end of the decade in...1994-1995 immigrant interdiction (Cubans) Sustain Liberty 1994-1997 defense/security During the decade, other Caribbean countries, particularly Cuba

  15. Military Implications of United Nations Peacekeeping Operations

    DTIC Science & Technology

    1993-06-01

    between the UN’s growing list of negotiated agreements and its ability to underwrite them with 30 WILLIAM H. LEWIS effective forces was revealed during the... rapidly changing situation. Words like "peace- making" and "peace-enforcement," used freely without any underlying doctrinal agreement as to what they...enforcement. The term "Second Generation" operations refers to a growing range of contingencies. sometimes incorrectly described as "peacekeeping" in

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Salnykov, A. A., E-mail: admin@rasnpp.org.ru

    A method for predicting operating technological failures in nuclear power plants which makes it possible to reduce the unloading of the generator unit during the onset and development of an anomalous engineering state of the equipment by detecting a change in state earlier and taking suitable measures. With the circulating water supply loop of a nuclear power plant as an example, scenarios and algorithms for predicting technological failures in the operation of equipment long before their actual occurrence are discussed.

  17. 78 FR 32278 - Vogtle Electric Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Change to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-29

    ... Paragraph A.4 of Section VIII, ``Processes for Changes and Departures,'' Appendix D to 10 CFR part 52 to... standardization caused by the exemption; and F. the exemption will not result in a significant decrease in the...

  18. 75 FR 54145 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-03

    ... to Construct a Concentrated Solar Thermal Power Plant Facility, Nye County, NV, Comment Period Ends..., GENERIC--License Renewal of Nuclear Plants for Kewaunee Power Station, Supplement 40 to NUREG-1437... EIS, NRC, GA, Vogtle Electric Generating Plant Units 3 and 4, Construction and Operation, Application...

  19. 77 FR 22361 - Entergy Nuclear Operations, Inc., (Indian Point Nuclear Generating Units 2 and 3); Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-13

    ... NRC E-Filing rule. See 10 CFR 2.302 et seq. Issued at Rockville, Maryland, this 9th day of April 2012. E. Roy Hawkens, Chief Administrative Judge, Atomic Safety and Licensing Board Panel. [FR Doc. 2012...

  20. Titanium recycling in the United States in 2004, chap. Y of Sibley, S.F., ed., Flow studies for recycling metal commodities in the United States

    USGS Publications Warehouse

    Goonan, Thomas G.

    2010-01-01

    As one of a series of reports that describe the recycling of metal commodities in the United States, this report discusses the titanium metal fraction of the titanium economy, which generates and uses titanium metal scrap in its operations. Data for 2004 were selected to demonstrate the titanium flows associated with these operations. This report includes a description of titanium metal supply and demand in the United States to illustrate the extent of titanium recycling and to identify recycling trends. In 2004, U.S. apparent consumption of titanium metal (contained in various titanium-bearing products) was 45,000 metric tons (t) of titanium, which was distributed as follows: 25,000 t of titanium recovered as new scrap, 9,000 t of titanium as titanium metal and titanium alloy products delivered to the U.S. titanium products reservoir, 7,000 t of titanium consumed by steelmaking and other industries, and 4,000 t of titanium contained in unwrought and wrought products exported. Titanium recycling is concentrated within the titanium metals sector of the total titanium market. The titanium market is otherwise dominated by pigment (titanium oxide) products, which generate dissipative losses instead of recyclable scrap. In 2004, scrap (predominantly new scrap) was the source of roughly 54 percent of the titanium metal content of U.S.-produced titanium metal products.

  1. First non-OEM steam-generator replacement in US a success

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hendsbee, P.M.; Lees, M.D.; Smith, J.C.

    1994-04-01

    In selecting replacements for major powerplant components, a fresh approach can be advantageous--even when complex nuclear components are involved. This was the experience at Unit 2 of Millstone nuclear station, which features an 870-MW pressurized-water reactor (PWR) with two nuclear recirculating steam generators. The unit began operation in 1975. In the early 1980s, pitting problems surfaced in the steam generator tubing; by the mid eighties, tube corrosion had reached an unacceptable level. Virtually all of the 17,000 tubes in the two units were deteriorating, with 2500 plugged and 5000 sleeved. Several new problems also were identified, including secondary-side circumferential crackingmore » of the Alloy 600 tubing near the tubesheet face, and deterioration of the carbon steel egg-crate tube supports. Despite improvements to primary and secondary steam-generator water chemistry, including almost complete copper removal from the condensate and feedwater loops, Northeast Utilities (NU) was unable to completely control degradation of the tube bundles. The utility decided in 1987 that full replacement was the most viable alternative. NU made a bold move, selecting a supplier other than the original equipment manufacturer (OEM).« less

  2. The analysis of parameters of the cryogenic oxygen unit cooperating with power plant to realize oxy-fuel combustion

    NASA Astrophysics Data System (ADS)

    Hnydiuk-Stefan, Anna; Składzień, Jan

    2015-03-01

    The paper examines from the thermodynamic point of view operation of coal fired power unit cooperating with the cryogenic oxygen unit, with a particular emphasis on the characteristic performance parameters of the oxygen unit. The relatively high purity technical oxygen produced in the oxygen unit is then used as the oxidant in the fluidized bed boiler of the modern coal fired power unit with electric power output of approximately 460 MW. The analyzed oxygen unit has a classical two-column structure with an expansion turbine (turboexpander), which allows the use of relatively low pressure initially compressed air. Multivariant calculations were performed, the main result being the loss of power and efficiency of the unit due to the need to ensure adequate driving power to the compressor system of the oxygen generating plant.

  3. Results of Steam-Water-Oxygen Treatment of the Inside of Heating Surfaces in Heat-Recovery Steam Generators of the PGU-800 Power Unit at the Perm' District Thermal Power Station

    NASA Astrophysics Data System (ADS)

    Ovechkina, O. V.; Zhuravlev, L. S.; Drozdov, A. A.; Solomeina, S. V.

    2018-05-01

    Prestarting, postinstallation steam-water-oxygen treatment (SWOT) of the natural circulation/steam reheat heat-recovery steam generators (HRSG) manufactured by OAO Krasny Kotelshchik was performed at the PGU-800 power unit of the Perm District Thermal Power Station (GRES). Prior to SWOT, steam-oxygen cleaning, passivation, and preservation of gas condensate heaters (GCH) of HRSGs were performed for 10 h using 1.3MPa/260°C/70 t/h external steam. After that, test specimens were cut out that demonstrated high strength of the passivating film. SWOT of the inside of the heating surfaces was carried out during no-load operation of the gas turbine unit with an exhaust temperature of 280-300°C at the HRSG inlet. The steam turbine was shutdown, and the generated steam was discharged into the atmosphere. Oxygen was metered into the discharge pipeline of the electricity-driven feed pumps and downcomers of the evaporators. The behavior of the concentration by weight of iron compounds and the results of investigation of cutout specimens by the drop or potentiometric method indicate that the steam-water-oxygen process makes it possible to remove corrosion products and reduce the time required to put a boiler into operation. Unlike other processes, SWOT does not require metal-intensive cleaning systems, temporary metering stations, and structures for collection of the waste solution.

  4. Advanced technology applications for second and third general coal gasification systems

    NASA Technical Reports Server (NTRS)

    Bradford, R.; Hyde, J. D.; Mead, C. W.

    1980-01-01

    The historical background of coal conversion is reviewed and the programmatic status (operational, construction, design, proposed) of coal gasification processes is tabulated for both commercial and demonstration projects as well as for large and small pilot plants. Both second and third generation processes typically operate at higher temperatures and pressures than first generation methods. Much of the equipment that has been tested has failed. The most difficult problems are in process control. The mechanics of three-phase flow are not fully understood. Companies participating in coal conversion projects are ordering duplicates of failure prone units. No real solutions to any of the significant problems in technology development have been developed in recent years.

  5. Water chemistry of the secondary circuit at a nuclear power station with a VVER power reactor

    NASA Astrophysics Data System (ADS)

    Tyapkov, V. F.; Erpyleva, S. F.

    2017-05-01

    Results of implementation of the secondary circuit organic amine water chemistry at Russian nuclear power plant (NPP) with VVER-1000 reactors are presented. The requirements for improving the reliability, safety, and efficiency of NPPs and for prolonging the service life of main equipment items necessitate the implementation of new technologies, such as new water chemistries. Data are analyzed on the chemical control of power unit coolant for quality after the changeover to operation with the feed of higher amines, such as morpholine and ethanolamine. Power units having equipment containing copper alloy components were converted from the all-volatile water chemistry to the ethanolamine or morpholine water chemistry with no increase in pH of the steam generator feedwater. This enables the iron content in the steam generator feedwater to be decreased from 6-12 to 2.0-2.5 μg/dm3. It is demonstrated that pH of high-temperature water is among the basic factors controlling erosion and corrosion wear of the piping and the ingress of corrosion products into NPP steam generators. For NPP power units having equipment whose construction material does not include copper alloys, the water chemistries with elevated pH of the secondary coolant are adopted. Stable dosing of correction chemicals at these power units maintains pH25 of 9.5 to 9.7 in the steam generator feedwater with a maximum iron content of 2 μg/dm3 in the steam generator feedwater.

  6. Evaluating the CO 2 emissions reduction potential and cost of power sector re-dispatch

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Steinberg, Daniel C.; Bielen, David A.; Townsend, Aaron

    Prior studies of the U.S. electricity sector have recognized the potential to reduce carbon dioxide (CO2) emissions by substituting generation from coal-fired units with generation from under-utilized and lower-emitting natural gas-fired units; in fact, this type of 're-dispatch' was invoked as one of the three building blocks used to set the emissions targets under the Environmental Protection Agency's Clean Power Plan. Despite the existence of surplus natural gas capacity in the U.S., power system operational constraints not often considered in power sector policy analyses, such as transmission congestion, generator ramping constraints, minimum generation constraints, planned and unplanned generator outages, andmore » ancillary service requirements, could limit the potential and increase the cost of coal-to-gas re-dispatch. Using a highly detailed power system unit commitment and dispatch model, we estimate the maximum potential for re-dispatch in the Eastern Interconnection, which accounts for the majority of coal capacity and generation in the U.S. Under our reference assumptions, we find that maximizing coal-to-gas re-dispatch yields emissions reductions of 230 million metric tons (Mt), or 13% of power sector emissions in the Eastern Interconnection, with a corresponding average abatement cost of $15-$44 per metric ton of CO2, depending on the assumed supply elasticity of natural gas.« less

  7. Advanced Stirling Radioisotope Generator Engineering Unit 2 Anomaly Investigation

    NASA Technical Reports Server (NTRS)

    Lewandowski, Edward J.; Dobbs, Michael W.; Oriti, Salvatore M.

    2018-01-01

    The Advanced Stirling Radioisotope Generator (ASRG) Engineering Unit 2 (EU2) is the highest fidelity electrically heated Stirling radioisotope generator built to date. NASA Glenn Research Center completed the assembly of the ASRG EU2 in September 2014 using hardware from the now cancelled ASRG flight development project. The ASRG EU2 integrated the first pair of Sunpower's Advanced Stirling Convertors (ASC-E3 #1 and #2) in an aluminum generator housing with Lockheed Martin's (LM's) Engineering Development Unit (EDU) 4 controller. After just 179 hr of EU2 generator operation, the first power fluctuation occurred on ASC-E3 #1. The first power fluctuation occurred 175 hr later on ASC-E3 #2. Over time, the power fluctuations became more frequent on both convertors and larger in magnitude. Eventually the EU2 was shut down in January 2015. An anomaly investigation was chartered to determine root cause of the power fluctuations and other anomalous observations. A team with members from Glenn, Sunpower, and LM conducted a thorough investigation of the EU2 anomalies. Findings from the EU2 disassembly identified proximate causes of the anomalous observations. Discussion of the team's assessment of the primary possible failure theories, root cause, and conclusions is provided. Recommendations are made for future Stirling generator development to address the findings from the anomaly investigation. Additional findings from the investigation are also discussed.

  8. Thermal vacuum life test facility for radioisotope thermoelectric generators

    NASA Astrophysics Data System (ADS)

    Deaton, R. L.; Goebel, C. J.; Amos, W. R.

    In the late 1970's, the Department of Energy (DOE) assigned Monsanto Research Corporation, Mound Facility, now operated by EG and G Mound Applied Technologies, the responsibility for assembling and testing General Purpose Heat Source (GPHS) radioisotope thermoelectric generators (RTGs). Assembled and tested were five RTGs, which included four flight units and one non-flight qualification unit. Figure 1 shows the RTG, which was designed by General Electric AstroSpace Division (GE/ASD) to produce 285 W of electrical power. A detailed description of the processes for RTG assembly and testing is presented by Amos and Goebel (1989). The RTG performance data are described by Bennett, et al., (1986). The flight units will provide electrical power for the National Aeronautics and Space Administration's (NASA) Galileo mission to Jupiter (two RTGs) and the joint NASA/European Space Agency (ESA) Ulysses mission to study the polar regions of the sun (one RTG). The remaining flight unit will serve as the spare for both missions, and a non-flight qualification unit was assembled and tested to ensure that performance criteria were adequately met.

  9. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 4, Appendixes B-D

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-02-01

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced bymore » Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.« less

  10. Salt Lake City Area Integrated Projects Electric Power Marketing. Draft environmental impact statement: Volume 2, Sections 1-16

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced bymore » Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.« less

  11. Test Hardware Design for Flightlike Operation of Advanced Stirling Convertors (ASC-E3)

    NASA Technical Reports Server (NTRS)

    Oriti, Salvatore M.

    2012-01-01

    NASA Glenn Research Center (GRC) has been supporting development of the Advanced Stirling Radioisotope Generator (ASRG) since 2006. A key element of the ASRG project is providing life, reliability, and performance testing of the Advanced Stirling Convertor (ASC). For this purpose, the Thermal Energy Conversion branch at GRC has been conducting extended operation of a multitude of free-piston Stirling convertors. The goal of this effort is to generate long-term performance data (tens of thousands of hours) simultaneously on multiple units to build a life and reliability database. The test hardware for operation of these convertors was designed to permit in-air investigative testing, such as performance mapping over a range of environmental conditions. With this, there was no requirement to accurately emulate the flight hardware. For the upcoming ASC-E3 units, the decision has been made to assemble the convertors into a flight-like configuration. This means the convertors will be arranged in the dual-opposed configuration in a housing that represents the fit, form, and thermal function of the ASRG. The goal of this effort is to enable system level tests that could not be performed with the traditional test hardware at GRC. This offers the opportunity to perform these system-level tests much earlier in the ASRG flight development, as they would normally not be performed until fabrication of the qualification unit. This paper discusses the requirements, process, and results of this flight-like hardware design activity.

  12. Test Hardware Design for Flight-Like Operation of Advanced Stirling Convertors

    NASA Technical Reports Server (NTRS)

    Oriti, Salvatore M.

    2012-01-01

    NASA Glenn Research Center (GRC) has been supporting development of the Advanced Stirling Radioisotope Generator (ASRG) since 2006. A key element of the ASRG project is providing life, reliability, and performance testing of the Advanced Stirling Convertor (ASC). For this purpose, the Thermal Energy Conversion branch at GRC has been conducting extended operation of a multitude of free-piston Stirling convertors. The goal of this effort is to generate long-term performance data (tens of thousands of hours) simultaneously on multiple units to build a life and reliability database. The test hardware for operation of these convertors was designed to permit in-air investigative testing, such as performance mapping over a range of environmental conditions. With this, there was no requirement to accurately emulate the flight hardware. For the upcoming ASC-E3 units, the decision has been made to assemble the convertors into a flight-like configuration. This means the convertors will be arranged in the dual-opposed configuration in a housing that represents the fit, form, and thermal function of the ASRG. The goal of this effort is to enable system level tests that could not be performed with the traditional test hardware at GRC. This offers the opportunity to perform these system-level tests much earlier in the ASRG flight development, as they would normally not be performed until fabrication of the qualification unit. This paper discusses the requirements, process, and results of this flight-like hardware design activity.

  13. KSC-97PC1094

    NASA Image and Video Library

    1997-07-19

    Jet Propulsion Laboratory (JPL) employees bolt a radioisotope thermoelectric generator (RTG) onto the Cassini spacecraft, at left, while other JPL workers, at right, operate the installation cart on a raised platform in the Payload Hazardous Servicing Facility (PHSF). Cassini will be outfitted with three RTGs. The power units are undergoing mechanical and electrical verification tests in the PHSF. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate at great distances from the Sun where solar power systems are not feasible. The Cassini mission is targeted for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed by JPL

  14. Operating health analysis of electric power systems

    NASA Astrophysics Data System (ADS)

    Fotuhi-Firuzabad, Mahmud

    The required level of operating reserve to be maintained by an electric power system can be determined using both deterministic and probabilistic techniques. Despite the obvious disadvantages of deterministic approaches there is still considerable reluctance to apply probabilistic techniques due to the difficulty of interpreting a single numerical risk index and the lack of sufficient information provided by a single index. A practical way to overcome difficulties is to embed deterministic considerations in the probabilistic indices in order to monitor the system well-being. The system well-being can be designated as healthy, marginal and at risk. The concept of system well-being is examined and extended in this thesis to cover the overall area of operating reserve assessment. Operating reserve evaluation involves the two distinctly different aspects of unit commitment and the dispatch of the committed units. Unit commitment health analysis involves the determination of which unit should be committed to satisfy the operating criteria. The concepts developed for unit commitment health, margin and risk are extended in this thesis to evaluate the response well-being of a generating system. A procedure is presented to determine the optimum dispatch of the committed units to satisfy the response criteria. The impact on the response wellbeing being of variations in the margin time, required regulating margin and load forecast uncertainty are illustrated. The effects on the response well-being of rapid start units, interruptible loads and postponable outages are also illustrated. System well-being is, in general, greatly improved by interconnection with other power systems. The well-being concepts are extended to evaluate the spinning reserve requirements in interconnected systems. The interconnected system unit commitment problem is decomposed into two subproblems in which unit scheduling is performed in each isolated system followed by interconnected system evaluation. A procedure is illustrated to determine the well-being indices of the overall interconnected system. Under normal operating conditions, the system may also be able to carry a limited amount of interruptible load on top of its firm load without violating the operating criterion. An energy based approach is presented to determine the optimum interruptible load carrying capability in both the isolated and interconnected systems. Composite system spinning reserve assessment and composite system well-being are also examined in this research work. The impacts on the composite well-being of operating reserve considerations such as stand-by units, interruptible loads and the physical locations of these resources are illustrated. It is expected that the well-being framework and the concepts developed in this research work will prove extremely useful in the new competitive utility environment.

  15. Electrical Power Generated from Tidal Currents and Delivered to USCG Station Eastport, ME

    DTIC Science & Technology

    2011-01-21

    35 Theory of Operation The ORPC Pre-Commercial Beta Turbine Generator Unit (“Beta TGU”) uses a hydrokinetic cross flow turbine based on Darrieus ...development in the wind turbine industry. The power coefficient (a measure of energy extraction effectiveness) is defined as follows: 31 2 turbine ...stream area of the device. Axial flow wind turbines have demonstrated power coefficients to an estimated 48% which approaches the theoretical “Betz

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Strickland, Christopher E.; Lawter, Amanda R.; Qafoku, Nikolla

    Isotopes of iodine were generated during plutonium production from nine production reactors at the U.S. Department of Energy Hanford Site. The long half-life 129I generated at the Hanford Site during reactor operations was 1) stored in single-shell and double-shell tanks, 2) discharged to liquid disposal sites (e.g., cribs and trenches), 3) released to the atmosphere during fuel reprocessing operations, or 4) captured by off-gas absorbent devices (silver reactors) at chemical separations plants (PUREX, B-Plant, T-Plant, and REDOX). Releases of 129I to the subsurface have resulted in several large, though dilute, plumes in the groundwater, including the plume in the 200-UP-1more » operable unit. There is also 129I remaining in the vadose zone beneath disposal or leak locations. Because 129I is an uncommon contaminant, relevant remediation experience and scientific literature are limited.« less

  17. 40 CFR 62.14104 - Requirements for municipal waste combustor operating practices.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...), proceed in accordance with ASME PTC 4.1-1964 (Reaffirmed 1991), Power Test Codes: Test Code for Steam Generating Units (with 1968 and 1969 Addenda). For design, construction, installation, calibration, and use... Mechanical Engineers, Service Center, 22 Law Drive, Post Office Box 2900, Fairfield, NJ 07007. You may...

  18. 40 CFR 62.14104 - Requirements for municipal waste combustor operating practices.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...), proceed in accordance with ASME PTC 4.1-1964 (Reaffirmed 1991), Power Test Codes: Test Code for Steam Generating Units (with 1968 and 1969 Addenda). For design, construction, installation, calibration, and use... Mechanical Engineers, Service Center, 22 Law Drive, Post Office Box 2900, Fairfield, NJ 07007. You may...

  19. 40 CFR 62.14104 - Requirements for municipal waste combustor operating practices.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...), proceed in accordance with ASME PTC 4.1-1964 (Reaffirmed 1991), Power Test Codes: Test Code for Steam Generating Units (with 1968 and 1969 Addenda). For design, construction, installation, calibration, and use... Mechanical Engineers, Service Center, 22 Law Drive, Post Office Box 2900, Fairfield, NJ 07007. You may...

  20. 40 CFR 62.14104 - Requirements for municipal waste combustor operating practices.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...), proceed in accordance with ASME PTC 4.1-1964 (Reaffirmed 1991), Power Test Codes: Test Code for Steam Generating Units (with 1968 and 1969 Addenda). For design, construction, installation, calibration, and use... Mechanical Engineers, Service Center, 22 Law Drive, Post Office Box 2900, Fairfield, NJ 07007. You may...

  1. 40 CFR 62.14104 - Requirements for municipal waste combustor operating practices.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...), proceed in accordance with ASME PTC 4.1-1964 (Reaffirmed 1991), Power Test Codes: Test Code for Steam Generating Units (with 1968 and 1969 Addenda). For design, construction, installation, calibration, and use... Mechanical Engineers, Service Center, 22 Law Drive, Post Office Box 2900, Fairfield, NJ 07007. You may...

  2. CTAB Recommendations on Learning Environments for Innovation.

    ERIC Educational Resources Information Center

    Branscomb, Anne W.; And Others

    The report examines cultural and social forces in the United States which discourage innovation and creativity. The history of American innovation is reviewed; innovation is defined as the process by which new knowledge is generated and applied in the material and intellectual operations of society. Effects on innovation of the changing economic…

  3. OVERVIEW OF THE HISTORY, PRESENT STATUS, AND FUTURE DIRECTION OF SOLIDIFICATION/STABILIZATION TECHNOLOGIES FOR HAZARDOUS WASTE TREATMENT

    EPA Science Inventory

    Solidification/stabilization (S/S) technology processes are currently being utilized in the United States to treat inorganic and organic hazardous waste and radioactive waste. These wastes are generated from operating industry or have resulted from the uncontrolled management of ...

  4. Prospective Mathematics Teachers' Sense Making of Polynomial Multiplication and Factorization Modeled with Algebra Tiles

    ERIC Educational Resources Information Center

    Caglayan, Günhan

    2013-01-01

    This study is about prospective secondary mathematics teachers' understanding and sense making of representational quantities generated by algebra tiles, the quantitative units (linear vs. areal) inherent in the nature of these quantities, and the quantitative addition and multiplication operations--referent preserving versus referent…

  5. Milliwatt dc/dc Inverter

    NASA Technical Reports Server (NTRS)

    Mclyman, C. W.

    1983-01-01

    Compact dc/dc inverter uses single integrated-circuit package containing six inverter gates that generate and amplify 100-kHz square-wave switching signal. Square-wave switching inverts 10-volt local power to isolated voltage at another desired level. Relatively high operating frequency reduces size of filter capacitors required, resulting in small package unit.

  6. Climate change impacts on thermoelectric-power generation in the United States

    NASA Astrophysics Data System (ADS)

    Liu, L.

    2015-12-01

    Thermoelectric-power generation accounts for more than 70% of the total electricity generation in the United States, which requires large amounts of water for cooling purposes. Water withdrawals for thermoelectric-power generation accounted for 45% of total water use in the United States in 2010. Across the country, water demand from power plants is increasing due to pressures from growing populations and other needs, and is straining existing water resources. Moreover, temperature exceedance in receiving waters has increasingly caused power plants shut downs across parts of the country. Thermoelectric power is vulnerable to climate change owing to the combined effects of lower summer river flows and higher receiving water temperatures. In addition, the efficiency of production is reduced as air temperature rises, which propagates to more unfulfilled power demand during peak seasons. Therefore, a holistic modeling framework of water-energy-climate for the contiguous U.S. is presented here to quantify thermal output from power plants and estimate water use and energy production fluctuations due to ambient climate as well as environmental regulations. The model is calibrated on a plant-by-plant basis for year 2010 and 2011 using the available power plant inventory from the Energy Information Administration (EIA). Simulations were carried out for years 2012 and 2013, and results show moderate improvements in capturing thermal output variabilities after calibration. Future power plant operations under scenarios featuring different climate and regulatory settings were investigated. Results demonstrate the interplay among water, energy and climate, and that future changes in climate and socioeconomics significantly affect power plant operations, which may provide insights to climate change mitigation considerations and energy decisions.

  7. Cycle analysis of planar SOFC power generation with serial connection of low and high temperature SOFCs

    NASA Astrophysics Data System (ADS)

    Araki, Takuto; Ohba, Takahiro; Takezawa, Shinya; Onda, Kazuo; Sakaki, Yoshinori

    Solid oxide fuel cells (SOFCs) can be composed of solid components for stable operation, and high power generation efficiency is obtained by using high temperature exhaust heat for fuel reforming and bottoming power generation by a gas turbine. Recently, low-temperature SOFCs, which run in the temperature range of around 600 °C or above and give high power generation efficiency, have been developed. On the other hand, a power generation system with multi-staged fuel cells has been proposed by the United States DOE to obtain high efficiency. In our present study, a power generation system consisting of two-staged SOFCs with serial connection of low and high temperature SOFCs was investigated. Overpotential data for the low-temperature SOFC used in this study are based on recently published data, while data for high-temperature SOFC are based on our previous study. The numerical results show that the power generation efficiency of the two-staged SOFCs is 50.3% and the total efficiency of power generation with gas turbine is 56.1% under standard operating conditions. These efficiencies are a little higher than those by high-temperature SOFC only.

  8. Technology Assessment of Avanced propulsion Systems for Some Classes of Combat Vehicles. Volume 3. Appendices G-M.

    DTIC Science & Technology

    1978-09-01

    generally recognized that the best possible configura- tion for engines operating at high speeds and at high-pressure levels is probably the single...engines is invariably accom- plished by the operation of computer simulation models that generate specific numerical data rather than the generalized re...lationships common to other forms of prime mover based on units of mass or volume. Thus, providing such generalized relation- ships for a Stirling

  9. Demonstration of a residential CHP system based on PEM fuel cells

    NASA Astrophysics Data System (ADS)

    Gigliucci, G.; Petruzzi, L.; Cerelli, E.; Garzisi, A.; La Mendola, A.

    Fuel cell-based CHP systems are very attractive for stationary energy generation, since they allow production of electricity and heat in a decentralised, quiet, efficient and environmentally friendly way. As a means of evaluating this new technology, Enel Produzione installed a beta-version fuel cell CHP system, supplied by H-Power, at its experimental area sited in Livorno (Italy), and submitted it to a series of tests. The system is a co-generative unit, converting natural gas into electricity and heat: the former is delivered to local loads using electric load following capability; the latter is delivered to the experimental area hydraulic refrigeration circuit. Experiments were aimed at assessing the suitability of this kind of system to supply Italian residential customers. Factors such as performances, flexibility and operational requirements were evaluated under all the possible operating conditions, both under grid connected and stand alone configurations. At the same time, a mathematical model of the FC/CHP unit was developed to allow for the prediction of system performances and operating parameters under off-design conditions. This model can be used as an effective tool to optimise system operation when a particular customer has to be supplied. Results show that the prototype behaved as expected by a first "proof of concept" system and outline improvements to be achieved in order to satisfy the energy needs of small residential applications.

  10. Interactive chemistry management system (ICMS); Field demonstration results at United Illuminating

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Noto, F.A.; Farrell, D.M.; Lombard, E.V.

    1988-01-01

    The authors report on a field demonstration of the interactive chemistry management system (ICMS) performed in the late summer of 1987 at the New Haven Harbor Station of United Illuminating Co. This demonstration was the first installation of the ICMS at an actual plant site. The ICMS is a computer-based system designed to monitor, diagnose, and provide optional automatic control of water and steam chemistry throughout the steam generator cycle. It is one of the diagnostic modules that comprises CE-TOPS (combustion engineering total on-line performance system), which continuously monitors operating conditions and suggests priority actions to increase operation efficiency, extendmore » the performance life of boiler components and reduce maintenance costs. By reducing the number of forced outages through early identification of potentially detrimental conditions, diagnosis of possible causes, and execution of corrective actions, improvements in unit availability and reliability will result.« less

  11. Polymer electrolyte fuel cell mini power unit for portable application

    NASA Astrophysics Data System (ADS)

    Urbani, F.; Squadrito, G.; Barbera, O.; Giacoppo, G.; Passalacqua, E.; Zerbinati, O.

    This paper describes the design, realisation and test of a power unit based on a polymer electrolyte fuel cell, operating at room temperature, for portable application. The device is composed of an home made air breathing fuel cell stack, a metal hydride tank for H 2 supply, a dc-dc converter for power output control and a fan for stack cooling. The stack is composed by 10 cells with an active surface of 25 cm 2 and produces a rated power of 15 W at 6 V and 2 A. The stack successfully runs with end-off fed hydrogen without appreciable performance degradation during the time. The final assembled system is able to generate 12 W at 9.5 V, and power a portable DVD player for 3 h in continuous. The power unit has collected about 100 h of operation without maintenance.

  12. Method and system for redundancy management of distributed and recoverable digital control system

    NASA Technical Reports Server (NTRS)

    Stange, Kent (Inventor); Hess, Richard (Inventor); Kelley, Gerald B (Inventor); Rogers, Randy (Inventor)

    2012-01-01

    A method and system for redundancy management is provided for a distributed and recoverable digital control system. The method uses unique redundancy management techniques to achieve recovery and restoration of redundant elements to full operation in an asynchronous environment. The system includes a first computing unit comprising a pair of redundant computational lanes for generating redundant control commands. One or more internal monitors detect data errors in the control commands, and provide a recovery trigger to the first computing unit. A second redundant computing unit provides the same features as the first computing unit. A first actuator control unit is configured to provide blending and monitoring of the control commands from the first and second computing units, and to provide a recovery trigger to each of the first and second computing units. A second actuator control unit provides the same features as the first actuator control unit.

  13. Finite element analysis of heat generation from different light-polymerization sources during cementation of all-ceramic crowns.

    PubMed

    Tunc, Elif Pak

    2007-06-01

    Exothermic composite resin chemical reactions and visible light generators can produce heat during a restorative polymerization process. These thermal changes in restored teeth may cause pain and irreversible pulpitis. The purpose of this study was to analyze the temperature distribution and heat flow patterns of a crowned mandibular second premolar tooth model using 3 different light-polymerization technologies and a finite element technique. A 2-dimensional finite element model was used to simulate a clinical condition. Heat flow and thermal stress distribution in a tooth during cementation of an all-ceramic crown using 4 commercially available light-polymerization units (LPUs), each with different wavelengths (Elipar TriLight, Elipar Freelight, Apollo 95 E, and ADT 1000 PAC), were investigated. The temperature values were measured at 3, 10, 12, and 40 seconds for each light-polymerizing unit (LPU) at 6 different finite element nodes. Two-dimensional temporal and spatial distribution of the thermal stress within the tooth, including the thermal coefficients and boundary conditions of the dental materials, were obtained and evaluated. The temperature at the nodal points did not exceed 42 degrees C, which is a threshold value for tissue vitality within the recommended operating periods at the dentin and pulp surface for all LPUs, except for Elipar TriLight. In the case of Elipar TriLlight, the temperatures at the dentin and pulp surfaces were 47 degrees C and 42 degrees C, respectively. When the light-polymerization units were used according to the manufacturers' operating procedures and without prolonged operating periods, with the exception of Elipar TriLight, the investigated LPUs did not produce significant heat. However, when the operating periods were prolonged, unacceptable temperature increases were observed, especially with the high-intensity LPUs.

  14. Major design issues of molten carbonate fuel cell power generation unit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chen, T.P.

    1996-04-01

    In addition to the stack, a fuel cell power generation unit requires fuel desulfurization and reforming, fuel and oxidant preheating, process heat removal, waste heat recovery, steam generation, oxidant supply, power conditioning, water supply and treatment, purge gas supply, instrument air supply, and system control. These support facilities add considerable cost and system complexity. Bechtel, as a system integrator of M-C Power`s molten carbonate fuel cell development team, has spent substantial effort to simplify and minimize these supporting facilities to meet cost and reliability goals for commercialization. Similiar to other fuels cells, MCFC faces design challenge of how to complymore » with codes and standards, achieve high efficiency and part load performance, and meanwhile minimize utility requirements, weight, plot area, and cost. However, MCFC has several unique design issues due to its high operating temperature, use of molten electrolyte, and the requirement of CO2 recycle.« less

  15. Next Generation Advanced Video Guidance Sensor Development and Test

    NASA Technical Reports Server (NTRS)

    Howard, Richard T.; Bryan, Thomas C.; Lee, Jimmy; Robertson, Bryan

    2009-01-01

    The Advanced Video Guidance Sensor (AVGS) was the primary docking sensor for the Orbital Express mission. The sensor performed extremely well during the mission, and the technology has been proven on orbit in other flights too. Parts obsolescence issues prevented the construction of more AVGS units, so the next generation of sensor was designed with current parts and updated to support future programs. The Next Generation Advanced Video Guidance Sensor (NGAVGS) has been tested as a breadboard, two different brassboard units, and a prototype. The testing revealed further improvements that could be made and demonstrated capability beyond that ever demonstrated by the sensor on orbit. This paper presents some of the sensor history, parts obsolescence issues, radiation concerns, and software improvements to the NGAVGS. In addition, some of the testing and test results are presented. The NGAVGS has shown that it will meet the general requirements for any space proximity operations or docking need.

  16. Mass and number size distributions of emitted particulates at five important operation units in a hazardous industrial waste incineration plant.

    PubMed

    Lin, Chi-Chi; Huang, Hsiao-Lin; Hsiao, Wen-Yuan

    2016-01-01

    Past studies indicated particulates generated by waste incineration contain various hazardous compounds. The aerosol characteristics are very important for particulate hazard control and workers' protection. This study explores the detailed characteristics of emitted particulates from each important operation unit in a rotary kiln-based hazardous industrial waste incineration plant. A dust size analyzer (Grimm 1.109) and a scanning mobility particle sizer (SMPS) were used to measure the aerosol mass concentration, mass size distribution, and number size distribution at five operation units (S1-S5) during periods of normal operation, furnace shutdown, and annual maintenance. The place with the highest measured PM10 concentration was located at the area of fly ash discharge from air pollution control equipment (S5) during the period of normal operation. Fine particles (PM2.5) constituted the majority of the emitted particles from the incineration plant. The mass size distributions (elucidated) made it clear that the size of aerosols caused by the increased particulate mass, resulting from work activities, were mostly greater than 1.5 μm. Whereas the number size distributions showed that the major diameters of particulates that caused the increase of particulate number concentrations, from work activities, were distributed in the sub micrometer range. The process of discharging fly ash from air pollution control equipment can significantly increase the emission of nanoparticles. The mass concentrations and size distributions of emitted particulates were different at each operation unit. This information is valuable for managers to take appropriate strategy to reduce the particulate emission and associated worker exposure.

  17. Magnetic field errors tolerances of Nuclotron booster

    NASA Astrophysics Data System (ADS)

    Butenko, Andrey; Kazinova, Olha; Kostromin, Sergey; Mikhaylov, Vladimir; Tuzikov, Alexey; Khodzhibagiyan, Hamlet

    2018-04-01

    Generation of magnetic field in units of booster synchrotron for the NICA project is one of the most important conditions for getting the required parameters and qualitative accelerator operation. Research of linear and nonlinear dynamics of ion beam 197Au31+ in the booster have carried out with MADX program. Analytical estimation of magnetic field errors tolerance and numerical computation of dynamic aperture of booster DFO-magnetic lattice are presented. Closed orbit distortion with random errors of magnetic fields and errors in layout of booster units was evaluated.

  18. Using bioprocess stoichiometry to build a plant-wide mass balance based steady-state WWTP model.

    PubMed

    Ekama, G A

    2009-05-01

    Steady-state models are useful for design of wastewater treatment plants (WWTPs) because they allow reactor sizes and interconnecting flows to be simply determined from explicit equations in terms of unit operation performance criteria. Once the overall WWTP scheme is established and the main system defining parameters of the individual unit operations estimated, dynamic models can be applied to the connected unit operations to refine their design and evaluate their performance under dynamic flow and load conditions. To model anaerobic digestion (AD) within plant-wide WWTP models, not only COD and nitrogen (N) but also carbon (C) fluxes entering the AD need to be defined. Current plant-wide models, like benchmark simulation model No 2 (BSM2), impose a C flux at the AD influent. In this paper, the COD and N mass balance steady-state models of activated sludge (AS) organics degradation, nitrification and denitrification (ND) and anaerobic (AD) and aerobic (AerD) digestion of wastewater sludge are extended and linked with bioprocess transformation stoichiometry to form C, H, O, N, chemical oxygen demand (COD) and charge mass balance based models so that also C (and H and O) can be tracked through the whole WWTP. By assigning a stoichiometric composition (x, y, z and a in C(x)H(y)O(z)N(a)) to each of the five main influent wastewater organic fractions and ammonia, these, and the products generated from them via the biological processes, are tracked through the WWTP. The model is applied to two theoretical case study WWTPs treating the same raw wastewater (WW) to the same final sludge residual biodegradable COD. It is demonstrated that much useful information can be generated with the relatively simple steady-state models to aid WWTP layout design and track the different products exiting the WWTP via the solid, liquid and gas streams, such as aerobic versus anaerobic digestion of waste activated sludge, N loads in recycle streams, methane production for energy recovery and green house gas (CO(2), CH(4)) generation. To reduce trial and error usage of WWTP simulation software, it is recommended that they are extended to include pre-processors based on mass balance steady-state models to assist with WWTP layout design, unit operation selection, reactor sizing, option evaluation and comparison and wastewater characterization before dynamic simulation.

  19. Three essays on the effect of wind generation on power system planning and operations

    NASA Astrophysics Data System (ADS)

    Davis, Clay Duane

    While the benefits of wind generation are well known, some drawbacks are still being understood as wind power is integrated into the power grid at increasing levels. The primary difference between wind generation and other forms of generation is the intermittent, and somewhat unpredictable, aspect of this resource. The somewhat uncontrollable aspect of wind generation makes it important to consider the relationship between this resource and load, and also how the operation of other non-wind generation resources may be affected. The three essays that comprise this dissertation focus on these and other important issues related to wind generation; leading to an improved understanding of how to better plan for and utilize this resource. The first essay addresses the cost of increased levels of installed wind capacity from both a capacity planning and economic dispatch perspective to arrive at the total system cost of installing a unit of wind capacity. This total includes not only the cost of the wind turbine and associated infrastructure, but also the cost impact an additional unit of wind capacity has on the optimal mix and operation of other generating units in the electricity supply portfolio. The results of the model showed that for all wind expansion scenarios, wind capacity is not cost-effective regardless of the level of the wind production tax credit and carbon prices that were considered. Larger levels of installed wind capacity result in reduced variable cost, but this reduction is not able to offset increases in capital cost, as a unit of installed wind capacity does not result in an equal reduction in other non-wind capacity needs. The second essay develops a methodology to better handle unexpected short term fluctuations in wind generation within the existing power system. The methodology developed in this essay leads to lower expected costs by anticipating and planning for fluctuations in wind generation by focusing on key constraints in the system. The modified methodology achieves expected costs for the UC-ED problem that are as low as the full stochastic model and markedly lower than the deterministic model. The final essay focuses on valuing energy storage located at a wind site through multiple revenue streams, where energy storage is valued from the perspective of a profit maximizing investor. Given the current state of battery storage technology, a battery capacity of zero is optimal in the setting considered in this essay. The results presented in this essay are dependent on a technological breakthrough that substantially reduces battery cost and conclude that allowing battery storage to simultaneously participate in multiple wholesale markets is optimal relative to participating in any one market alone. Also, co-locating battery storage and wind provides value by altering the optimal transmission line capacity to the battery and wind site. This dissertation considers problems of wind integration from an economic perspective and builds on existing work in this area. The economics of wind integration and utilization are important because wind generation levels are already significant and will likely become more so in the future. While this dissertation adds to the existing literature, additional work is needed in this area to ensure wind generation adds as much value to the overall system as possible.

  20. Prospects for the use of SMR and IGCC technologies for power generation in Poland

    NASA Astrophysics Data System (ADS)

    Wyrwa, Artur; Suwała, Wojciech

    2017-11-01

    This study is a preliminary assessment of prospects for new power generation technologies that are of particular interest in Poland. We analysed the economic competitiveness of small size integrated gasification combined cycle units (IGCC) and small modular reactors (SMR). For comparison we used one of the most widely applied and universal metric i.e. Levelized Cost of Electricity (LCOE). The LCOE results were complemented with the results of energy-economic model TIMES-PL in order to analyse the economic viability of these technologies under operation regime of the entire power system. The results show that with techno-economic assumptions presented in the paper SMRs are more competitive option as compared to small IGCC units.

  1. Evaluation of a Combined Cyclone and Gas Filtration System for Particulate Removal in the Gasification Process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rizzo, Jeffrey J.

    2010-04-30

    The Wabash gasification facility, owned and operated by sgSolutions LLC, is one of the largest single train solid fuel gasification facilities in the world capable of transforming 2,000 tons per day of petroleum coke or 2,600 tons per day of bituminous coal into synthetic gas for electrical power generation. The Wabash plant utilizes Phillips66 proprietary E-Gas (TM) Gasification Process to convert solid fuels such as petroleum coke or coal into synthetic gas that is fed to a combined cycle combustion turbine power generation facility. During plant startup in 1995, reliability issues were realized in the gas filtration portion of themore » gasification process. To address these issues, a slipstream test unit was constructed at the Wabash facility to test various filter designs, materials and process conditions for potential reliability improvement. The char filtration slipstream unit provided a way of testing new materials, maintenance procedures, and process changes without the risk of stopping commercial production in the facility. It also greatly reduced maintenance expenditures associated with full scale testing in the commercial plant. This char filtration slipstream unit was installed with assistance from the United States Department of Energy (built under DOE Contract No. DE-FC26-97FT34158) and began initial testing in November of 1997. It has proven to be extremely beneficial in the advancement of the E-Gas (TM) char removal technology by accurately predicting filter behavior and potential failure mechanisms that would occur in the commercial process. After completing four (4) years of testing various filter types and configurations on numerous gasification feed stocks, a decision was made to investigate the economic and reliability effects of using a particulate removal gas cyclone upstream of the current gas filtration unit. A paper study had indicated that there was a real potential to lower both installed capital and operating costs by implementing a char cyclonefiltration hybrid unit in the E-Gas (TM) gasification process. These reductions would help to keep the E-Gas (TM) technology competitive among other coal-fired power generation technologies. The Wabash combined cyclone and gas filtration slipstream test program was developed to provide design information, equipment specification and process control parameters of a hybrid cyclone and candle filter particulate removal system in the E-Gas (TM) gasification process that would provide the optimum performance and reliability for future commercial use. The test program objectives were as follows: 1. Evaluate the use of various cyclone materials of construction; 2. Establish the optimal cyclone efficiency that provides stable long term gas filter operation; 3. Determine the particle size distribution of the char separated by both the cyclone and candle filters. This will provide insight into cyclone efficiency and potential future plant design; 4. Determine the optimum filter media size requirements for the cyclone-filtration hybrid unit; 5. Determine the appropriate char transfer rates for both the cyclone and filtration portions of the hybrid unit; 6. Develop operating procedures for the cyclone-filtration hybrid unit; and, 7. Compare the installed capital cost of a scaled-up commercial cyclone-filtration hybrid unit to the current gas filtration design without a cyclone unit, such as currently exists at the Wabash facility.« less

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wolfmeyer, J.C.; Jowers, C.; Weinstein, R.E.

    As the power industry moves toward increased competition, low operating costs become increasingly important for continued profitability. This paper provides an overview of the plant concept evaluation of using an emerging coal-fired technology for repowering one of Duke Energy steam generating stations. The paper describes the results of a US Department of Energy (DOE) conceptual design evaluation of an early commercial repowering application of advanced circulating pressurized fluidized bed combustion combined cycle technology (APFBC). The paper provides a review of the DOE study and summarizes the preliminary results. It shows the prospects for APFBC repowering, and discusses how this mightmore » be an attractive option for a wide range of existing power plants, when added baseload coal-fired generation is needed. This paper presents an APFBC concept under development by DOE and equipment manufacturers. This all-coal technology has projected energy efficiency in the 42 to 46% HHV (43 to 48% LHV) range and environmental emissions superior to New Source Performance Standards (NSPS). A DOE-sponsored Clean Coal Technology (CCT) demonstration program will pioneer the first commercial APFBC demonstration in year 2001. That 170 MWe APFBC CCT demonstration will use all new equipment, and become the City of Lakeland's C.D. McIntosh, Jr. steam plant Unit 4. This paper's concept evaluation is for a larger implementation. A Westinghouse W501F combustion turbine modified for APFBC operation is considered for use to produce a 300+MWe class APFBC combined cycle. At this size, APFBC has a wide application for repowering many existing units in America, Here, APFBC would repower an existing generation station, the Duke Energy Company's Dan River steam station. Repowering concepts are presented for APFBC repowering of Unit 3. The existing coal-fired Unit 3 has an output of about 150 MWe. When repowered with APFBC, this unit is boosted to about 280 MWe output, with high-energy efficiency.« less

  3. Power grid operation risk management: V2G deployment for sustainable development

    NASA Astrophysics Data System (ADS)

    Haddadian, Ghazale J.

    The production, transmission, and delivery of cost--efficient energy to supply ever-increasing peak loads along with a quest for developing a low-carbon economy require significant evolutions in the power grid operations. Lower prices of vast natural gas resources in the United States, Fukushima nuclear disaster, higher and more intense energy consumptions in China and India, issues related to energy security, and recent Middle East conflicts, have urged decisions makers throughout the world to look into other means of generating electricity locally. As the world look to combat climate changes, a shift from carbon-based fuels to non-carbon based fuels is inevitable. However, the variability of distributed generation assets in the electricity grid has introduced major reliability challenges for power grid operators. While spearheading sustainable and reliable power grid operations, this dissertation develops a multi-stakeholder approach to power grid operation design; aiming to address economic, security, and environmental challenges of the constrained electricity generation. It investigates the role of Electric Vehicle (EV) fleets integration, as distributed and mobile storage assets to support high penetrations of renewable energy sources, in the power grid. The vehicle-to-grid (V2G) concept is considered to demonstrate the bidirectional role of EV fleets both as a provider and consumer of energy in securing a sustainable power grid operation. The proposed optimization modeling is the application of Mixed-Integer Linear Programing (MILP) to large-scale systems to solve the hourly security-constrained unit commitment (SCUC) -- an optimal scheduling concept in the economic operation of electric power systems. The Monte Carlo scenario-based approach is utilized to evaluate different scenarios concerning the uncertainties in the operation of power grid system. Further, in order to expedite the real-time solution of the proposed approach for large-scale power systems, it considers a two-stage model using the Benders Decomposition (BD). The numerical simulation demonstrate that the utilization of smart EV fleets in power grid systems would ensure a sustainable grid operation with lower carbon footprints, smoother integration of renewable sources, higher security, and lower power grid operation costs. The results, additionally, illustrate the effectiveness of the proposed MILP approach and its potentials as an optimization tool for sustainable operation of large scale electric power systems.

  4. Transient performance of fan engine with water ingestion

    NASA Technical Reports Server (NTRS)

    Murthy, S. N. B.; Mullican, A.

    1993-01-01

    In a continuing investigation on developing and applying codes for prediction of performance of a turbine jet engine and its components with water ingestion during flight operation, including power settings, and flight altitudes and speed changes, an attempt was made to establish the effects of water ingestion through simulation of a generic high bypass ratio engine with a generic control. In view of the large effects arising in the air compression system and the prediffuser-combustor unit during water ingestion, attention was focused on those effects and the resulting changes in engine performance. Under all conditions of operation, whether ingestion is steady or not, it became evident that water ingestion causes a fan-compressor unit to operate in a time-dependent fashion with periodic features, particularly with respect to the state of water in the span and the film in the casing clearance space, at the exit of the machine. On the other hand, the aerodynamic performance of the unit may be considered as quasi-steady once the distribution of water has attained an equilibrium state with respect to its distribution and motion. For purposes of engine simulation, the performance maps for the generic fan-compressor unit were generated based on the attainment of a quasi-steady state (meaning steady except for long-period variations in performance) during ingestion and operation over a wide enough range of rotational speeds.

  5. Process engineering design of pathological waste incinerator with an integrated combustion gases treatment unit.

    PubMed

    Shaaban, A F

    2007-06-25

    Management of medical wastes generated at different hospitals in Egypt is considered a highly serious problem. The sources and quantities of regulated medical wastes have been thoroughly surveyed and estimated (75t/day from governmental hospitals in Cairo). From the collected data it was concluded that the most appropriate incinerator capacity is 150kg/h. The objective of this work is to develop the process engineering design of an integrated unit, which is technically and economically capable for incinerating medical wastes and treatment of combustion gases. Such unit consists of (i) an incineration unit (INC-1) having an operating temperature of 1100 degrees C at 300% excess air, (ii) combustion-gases cooler (HE-1) generating 35m(3)/h hot water at 75 degrees C, (iii) dust filter (DF-1) capable of reducing particulates to 10-20mg/Nm(3), (iv) gas scrubbers (GS-1,2) for removing acidic gases, (v) a multi-tube fixed bed catalytic converter (CC-1) to maintain the level of dioxins and furans below 0.1ng/Nm(3), and (vi) an induced-draft suction fan system (SF-1) that can handle 6500Nm(3)/h at 250 degrees C. The residence time of combustion gases in the ignition, mixing and combustion chambers was found to be 2s, 0.25s and 0.75s, respectively. This will ensure both thorough homogenization of combustion gases and complete destruction of harmful constituents of the refuse. The adequate engineering design of individual process equipment results in competitive fixed and operating investments. The incineration unit has proved its high operating efficiency through the measurements of different pollutant-levels vented to the open atmosphere, which was found to be in conformity with the maximum allowable limits as specified in the law number 4/1994 issued by the Egyptian Environmental Affairs Agency (EEAA) and the European standards.

  6. Condensate polisher prefiltration study for Laguna Verde Station

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Garcia, A.; Oyen, L.C.; Nelson, R.A.

    1995-05-01

    This paper describes an analysis of the iron and copper in the condensate and the technical and economic assessment of the installation of condensate polisher prefilters in Comision Federal de Electricidad`s Laguna Verde Nuclear Generating Station (LVNGS) north of Veracruz, Mexico. LVNGS is a 654 MWe General Electric BWR plant; Unit 1 has been in commercial operation since July, 1990, and Unit 2 is scheduled to become operational in June, 1995. The primary purpose of this study was to (1) analyze the high iron and copper concentrations in the condensate and feedwater, (2) identify, assess, and evaluate techniques to reducemore » the iron and copper concentrations, and (3) perform a cost-benefit analysis of the installation of implementing the appropriate techniques.« less

  7. Very large scale monoclonal antibody purification: the case for conventional unit operations.

    PubMed

    Kelley, Brian

    2007-01-01

    Technology development initiatives targeted for monoclonal antibody purification may be motivated by manufacturing limitations and are often aimed at solving current and future process bottlenecks. A subject under debate in many biotechnology companies is whether conventional unit operations such as chromatography will eventually become limiting for the production of recombinant protein therapeutics. An evaluation of the potential limitations of process chromatography and filtration using today's commercially available resins and membranes was conducted for a conceptual process scaled to produce 10 tons of monoclonal antibody per year from a single manufacturing plant, a scale representing one of the world's largest single-plant capacities for cGMP protein production. The process employs a simple, efficient purification train using only two chromatographic and two ultrafiltration steps, modeled after a platform antibody purification train that has generated 10 kg batches in clinical production. Based on analyses of cost of goods and the production capacity of this very large scale purification process, it is unlikely that non-conventional downstream unit operations would be needed to replace conventional chromatographic and filtration separation steps, at least for recombinant antibodies.

  8. Intelligent Chemistry Management System (ICMS)--A new approach to steam generator chemistry control

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barto, R.J.; Farrell, D.M.; Noto, F.A.

    1986-04-01

    The Intelligent Chemistry Management System (ICMS) is a new tool which assists in steam generator chemistry control. Utilizing diagnostic capabilities, the ICMS will provide utility and industrial boiler operators, system chemists, and plant engineers with a tool for monitoring, diagnosing, and controlling steam generator system chemistry. By reducing the number of forced outages through early identification of potentially detrimental conditions, suggestion of possible causes, and execution of corrective actions, improvements in unit availability and reliability will result. The system monitors water and steam quality at a number of critical locations in the plant.

  9. Flowsheets and source terms for radioactive waste projections

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Forsberg, C.W.

    1985-03-01

    Flowsheets and source terms used to generate radioactive waste projections in the Integrated Data Base (IDB) Program are given. Volumes of each waste type generated per unit product throughput have been determined for the following facilities: uranium mining, UF/sub 6/ conversion, uranium enrichment, fuel fabrication, boiling-water reactors (BWRs), pressurized-water reactors (PWRs), and fuel reprocessing. Source terms for DOE/defense wastes have been developed. Expected wastes from typical decommissioning operations for each facility type have been determined. All wastes are also characterized by isotopic composition at time of generation and by general chemical composition. 70 references, 21 figures, 53 tables.

  10. Skylab extravehicular mobility unit thermal simulator

    NASA Technical Reports Server (NTRS)

    Hixon, C. W.; Phillips, M. A.

    1974-01-01

    The analytical methods, thermal model, and user's instructions for the Skylab Extravehicular Mobility Unit (SEMU) routine are presented. This digital computer program was developed for detailed thermal performance predictions of the SEMU on the NASA-JSC Univac 1108 computer system. It accounts for conductive, convective, and radiant heat transfer as well as fluid flow and special component characterization. The program provides thermal performance predictions for a 967 node thermal model in one thirty-sixth (1/36) of mission time when operated at a calculating interval of three minutes (mission time). The program has the operational flexibility to: (1) accept card or magnetic tape data input for the thermal model describing the SEMU structure, fluid systems, crewman and component performance, (2) accept card and/or magnetic tape input of internally generated heat and heat influx from the space environment, and (3) output tabular or plotted histories of temperature, flow rates, and other parameters describing system operating modes.

  11. High-speed clock recovery unit based on a phase aligner

    NASA Astrophysics Data System (ADS)

    Tejera, Efrain; Esper-Chain, Roberto; Tobajas, Felix; De Armas, Valentin; Sarmiento, Roberto

    2003-04-01

    Nowadays clock recovery units are key elements in high speed digital communication systems. For an efficient operation, this units should generate a low jitter clock based on the NRZ received data, and be tolerant to long absence of transitions. Architectures based on Hogge phase detectors have been widely used, nevertheless, they are very sensitive to jitter of the received data and they have a limited tolerance to the absence of transitions. This paper shows a novel high speed clock recovery unit based on a phase aligner. The system allows a very fast clock recovery with a low jitter, moreover, it is very resistant to absence of transitions. The design is based on eight phases obtained from a reference clock running at the nominal frequency of the received signal. This high speed reference clock is generated using a crystal and a clock multiplier unit. The phase alignment system chooses, as starting point, the two phases closest to the data phase. This allows a maximum error of 45 degrees between the clock and data signal phases. Furthermore, the system includes a feed-back loop that interpolates the chosen phases to reduce the phase error to zero. Due to the high stability and reduced tolerance of the local reference clock, the jitter obtained is highly reduced and the system becomes able to operate under long absence of transitions. This performances make this design suitable for systems such as high speed serial link technologies. This system has been designed for CMOS 0.25μm at 1.25GHz and has been verified through HSpice simulations.

  12. Generation-IV Nuclear Energy Systems

    NASA Astrophysics Data System (ADS)

    McFarlane, Harold

    2008-05-01

    Nuclear power technology has evolved through roughly three generations of system designs: a first generation of prototypes and first-of-a-kind units implemented during the period 1950 to 1970; a second generation of industrial power plants built from 1970 to the turn of the century, most of which are still in operation today; and a third generation of evolutionary advanced reactors which began being built by the turn of the 20^th century, usually called Generation III or III+, which incorporate technical lessons learned through more than 12,000 reactor-years of operation. The Generation IV International Forum (GIF) is a cooperative international endeavor to develop advanced nuclear energy systems in response to the social, environmental and economic requirements of the 21^st century. Six Generation IV systems under development by GIF promise to enhance the future contribution and benefits of nuclear energy. All Generation IV systems aim at performance improvement, new applications of nuclear energy, and/or more sustainable approaches to the management of nuclear materials. High-temperature systems offer the possibility of efficient process heat applications and eventually hydrogen production. Enhanced sustainability is achieved primarily through adoption of a closed fuel cycle with reprocessing and recycling of plutonium, uranium and minor actinides using fast reactors. This approach provides significant reduction in waste generation and uranium resource requirements.

  13. Investigation into the High Voltage Shutdown of the Oxygen Generator System in the International Space Station

    NASA Technical Reports Server (NTRS)

    Carpenter, Joyce E.; Gentry, Gregory J.; Diderich, Greg S.; Roy, Robert J.; Golden, John L.; VanKeuren, Steve; Steele, John W.; Rector, Tony J.; Varsik, Jerome D.; Montefusco, Daniel J.; hide

    2012-01-01

    The Oxygen Generation System (OGS) Hydrogen Dome Assembly Orbital Replacement Unit (ORU) serial number 00001 suffered a cell stack high-voltage shutdown on July 5, 2010. The Hydrogen Dome Assembly ORU was removed and replaced with the on-board spare ORU serial number 00002 to maintain OGS operation. The Hydrogen Dome Assembly ORU was returned from ISS on STS-133/ULF-5 in March 2011 with test, teardown and evaluation (TT&E) and failure analysis to follow.

  14. US Advanced Freight and Passenger MAGLEV System

    NASA Technical Reports Server (NTRS)

    Morena, John J.; Danby, Gordon; Powell, James

    1996-01-01

    Japan and Germany will operate first generation Maglev passenger systems commercially shortly after 2000 A.D. The United States Maglev systems will require sophisticated freight and passenger carrying capability. The U.S. freight market is larger than passenger transport. A proposed advanced freight and passenger Maglev Project in Brevard County Florida is described. Present Maglev systems cost 30 million dollars or more per mile. Described is an advanced third generation Maglev system with technology improvements that will result in a cost of 10 million dollars per mile.

  15. A Reserve-based Method for Mitigating the Impact of Renewable Energy

    NASA Astrophysics Data System (ADS)

    Krad, Ibrahim

    The fundamental operating paradigm of today's power systems is undergoing a significant shift. This is partially motivated by the increased desire for incorporating variable renewable energy resources into generation portfolios. While these generating technologies offer clean energy at zero marginal cost, i.e. no fuel costs, they also offer unique operating challenges for system operators. Perhaps the biggest operating challenge these resources introduce is accommodating their intermittent fuel source availability. For this reason, these generators increase the system-wide variability and uncertainty. As a result, system operators are revisiting traditional operating strategies to more efficiently incorporate these generation resources to maximize the benefit they provide while minimizing the challenges they introduce. One way system operators have accounted for system variability and uncertainty is through the use of operating reserves. Operating reserves can be simplified as excess capacity kept online during real time operations to help accommodate unforeseen fluctuations in demand. With new generation resources, a new class of operating reserves has emerged that is generally known as flexibility, or ramping, reserves. This new reserve class is meant to better position systems to mitigate severe ramping in the net load profile. The best way to define this new requirement is still under investigation. Typical requirement definitions focus on the additional uncertainty introduced by variable generation and there is room for improvement regarding explicit consideration for the variability they introduce. An exogenous reserve modification method is introduced in this report that can improve system reliability with minimal impacts on total system wide production costs. Another potential solution to this problem is to formulate the problem as a stochastic programming problem. The unit commitment and economic dispatch problems are typically formulated as deterministic problems due to fast solution times and the solutions being sufficient for operations. Improvements in technical computing hardware have reignited interest in stochastic modeling. The variability of wind and solar naturally lends itself to stochastic modeling. The use of explicit reserve requirements in stochastic models is an area of interest for power system researchers. This report introduces a new reserve modification implementation based on previous results to be used in a stochastic modeling framework. With technological improvements in distributed generation technologies, microgrids are currently being researched and implemented. Microgrids are small power systems that have the ability to serve their demand with their own generation resources and may have a connection to a larger power system. As battery technologies improve, they are becoming a more viable option in these distributed power systems and research is necessary to determine the most efficient way to utilize them. This report will investigate several unique operating strategies for batteries in small power systems and analyze their benefits. These new operating strategies will help reduce operating costs and improve system reliability.

  16. RCRA Part A Permit Application for Waste Management Activities at the Nevada Test Site, Part B Permit Application Hazardous Waste Storage Unit, Nevada Test Site, and Part B Permit Application - Explosives Ordnance Disposal Unit (EODU)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Programs

    2010-06-17

    The Area 5 Hazardous Waste Storage Unit (HWSU) was established to support testing, research, and remediation activities at the Nevada Test Site (NTS), a large-quantity generator of hazardous waste. The HWSU, located adjacent to the Area 5 Radioactive Waste Management Site (RWMS), is a prefabricated, rigid steel-framed, roofed shelter used to store hazardous nonradioactive waste generated on the NTS. No offsite generated wastes are managed at the HWSU. Waste managed at the HWSU includes the following categories: Flammables/Combustibles; Acid Corrosives; Alkali Corrosives; Oxidizers/Reactives; Toxics/Poisons; and Other Regulated Materials (ORMs). A list of the regulated waste codes accepted for storage atmore » the HWSU is provided in Section B.2. Hazardous wastes stored at the HWSU are stored in U.S. Department of Transportation (DOT) compliant containers, compatible with the stored waste. Waste transfer (between containers) is not allowed at the HWSU and containers remain closed at all times. Containers are stored on secondary containment pallets and the unit is inspected monthly. Table 1 provides the metric conversion factors used in this application. Table 2 provides a list of existing permits. Table 3 lists operational Resource Conservation and Recovery Act (RCRA) units at the NTS and their respective regulatory status.« less

  17. Overview of the Habitat Demonstration Unit Power System Integration and Operation at Desert RATS 2010

    NASA Technical Reports Server (NTRS)

    Colozza, Anthony J.; George, Pat; Gambrell, Ronnie; Chapman, Chris

    2013-01-01

    A habitat demonstration unit (HDU) was constructed at NASA Johnson Space Center (JSC) and designed by a multicenter NASA team led out of NASA Kennedy Space Center (KSC). The HDU was subsequently utilized at the 2010 Desert Research and Technology Studies (RATS) program held at the Black Point Lava Flow in Arizona. This report describes the power system design, installation and operation for the HDU. The requirements for the power system were to provide 120 VAC, 28 VDC, and 120 VDC power to the various loads within the HDU. It also needed to be capable of providing power control and real-time operational data on the load's power consumption. The power system had to be capable of operating off of a 3 phase 480 VAC generator as well as 2 solar photovoltaic (PV) power systems. The system operated well during the 2 week Desert RATS campaign and met all of the main goals of the system. The power system is being further developed to meet the future needs of the HDU and options for this further development are discussed.

  18. An Examination of the United States Navy’s Ability to Conduct Operational Fires

    DTIC Science & Technology

    1992-05-12

    34 18 Thus, the Allied command determined that this attempt was AFFORDABLE or that they had the ability "to manage or bear [the] cost without serious...enhance the situation, but the enormous cost of this project and the time required to generate this data still places a solution years in the future...approach the accuracy enjoyed by more sophisticated overhead imagery systems at a fraction of the cost . The Navy started RPV operations after losing

  19. Cassini's RTGs undergo mechanical and electrical verification tests in the PHSF

    NASA Technical Reports Server (NTRS)

    1997-01-01

    Jet Propulsion Laboratory (JPL) employees bolt a radioisotope thermoelectric generator (RTG) onto the Cassini spacecraft, at left, while other JPL workers, at right, operate the installation cart on a raised platform in the Payload Hazardous Servicing Facility (PHSF). Cassini will be outfitted with three RTGs. The power units are undergoing mechanical and electrical verification tests in the PHSF. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate at great distances from the Sun where solar power systems are not feasible. The Cassini mission is targeted for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed by JPL.

  20. A performance comparison of the IBM RS/6000 and the Astronautics ZS-1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, W.M.; Abraham, S.G.; Davidson, E.S.

    1991-01-01

    Concurrent uniprocessor architectures, of which vector and superscalar are two examples, are designed to capitalize on fine-grain parallelism. The authors have developed a performance evaluation method for comparing and improving these architectures, and in this article they present the methodology and a detailed case study of two machines. The runtime of many programs is dominated by time spent in loop constructs - for example, Fortran Do-loops. Loops generally comprise two logical processes: The access process generates addresses for memory operations while the execute process operates on floating-point data. Memory access patterns typically can be generated independently of the data inmore » the execute process. This independence allows the access process to slip ahead, thereby hiding memory latency. The IBM 360/91 was designed in 1967 to achieve slip dynamically, at runtime. One CPU unit executes integer operations while another handles floating-point operations. Other machines, including the VAX 9000 and the IBM RS/6000, use a similar approach.« less

  1. Engineering Resilience Into The Marine Expeditionary Units Resupply System Through Military Foraging

    DTIC Science & Technology

    2017-09-01

    19 Figure 7. Solar Portable Alternative Communications Energy System ( SPACES ) Source...sustained operations ashore SPACES solar portable alternative communications energy system STOM ship-to-objective maneuver STSM ship-to-shore movement... Communications Energy System Solar Portable Alternative Communications Energy System ( SPACES ) is a man-portable energy generation system for mounted

  2. 78 FR 5505 - Turkey Point, Units 3 and 4; Application and Amendment to Facility Operating License Involving...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-25

    ...: You may access information and comment submissions related to this document, which the NRC possesses... access information related to this document, which the NRC possesses and are publicly available, by any... generation and the potential for stainless steel stress corrosion cracking is reduced. Therefore, the...

  3. Visibility Variability at Seattle, WA and Portland, OR : Insights into the Impacts of Runway Visual Range (RVR) Measurements on Aviation Operations.

    DOT National Transportation Integrated Search

    2001-01-14

    The FAA's new generation Runway Visual Range (RVR) : system was first placed into service in 1994 at several : key airports in the United States. During the last three : years, the Volpe National Transportation Systems Center : has monitored RVR data...

  4. 76 FR 52357 - Exelon Generation Company, LLC; PSEG Nuclear, LLC; Peach Bottom Atomic Power Station, Unit 3...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-22

    ... Amendment to Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing and Order Imposing Procedures for Document Access to Sensitive Unclassified Non... on the NRC Web site and on the Federal rulemaking Web site, http://www.regulations.gov . Because your...

  5. 78 FR 20144 - Entergy Nuclear Operations, Inc., Indian Point Nuclear Generating Unit 3

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-03

    ... Research. The test results concluded that the Hemyc ERFBS does not provide the level of protection expected... information that that you do not want to be publicly disclosed in your comment submission. The NRC will post... to the credited post-fire safe-shutdown capability which remains materially unchanged from the...

  6. GOES-R Lift to Stand

    NASA Image and Video Library

    2016-08-23

    The GOES-R spacecraft is secured on its work stand inside the Astrotech payload processing facility in Titusville, Florida near NASA’s Kennedy Space Center. GOES-R will be the first satellite in a series of next-generation NOAA Geostationary Operational Environmental Satellites. The spacecraft is to launch aboard a United Launch Alliance Atlas V rocket in November.

  7. GOES-R Uncrating and Move to Vertical

    NASA Image and Video Library

    2016-08-23

    The GOES-R spacecraft stands vertically inside the Astrotech payload processing facility in Titusville, Florida near NASA’s Kennedy Space Center. GOES-R will be the first satellite in a series of next-generation NOAA Geostationary Operational Environmental Satellites. The spacecraft is to launch aboard a United Launch Alliance Atlas V rocket in November.

  8. Nuclear Taskforce Summation.

    ERIC Educational Resources Information Center

    1979

    At the end of 1978, there were approximately 230 nuclear-fueled electric generating plants around the world; 72 of these were in the United States. Each plant requires an operations-and-maintenance workforce of 92 people, and attrition occurs at a rate of 8% per year. Requirements for a nuclear taskforce and job training, in view of current…

  9. 40 CFR 98.30 - Definition of the source category.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... useful heat or energy for industrial, commercial, or institutional use, or reducing the volume of waste... generators and emergency equipment, as defined in § 98.6. (3) Irrigation pumps at agricultural operations. (4... unit that combusts hazardous waste (as defined in § 261.3 of this chapter), reporting of GHG emissions...

  10. 40 CFR 98.30 - Definition of the source category.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... useful heat or energy for industrial, commercial, or institutional use, or reducing the volume of waste... generators and emergency equipment, as defined in § 98.6. (3) Irrigation pumps at agricultural operations. (4... unit that combusts hazardous waste (as defined in § 261.3 of this chapter), reporting of GHG emissions...

  11. 76 FR 9379 - Exelon Generation Company, LLC; Lasalle County Station, Units 1 and 2; Environmental Assessment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-17

    ...-38, ``Storage of Low-Level Radioactive Wastes at Power Reactor Sites'' and to meet the radiation protection standards in 10 CFR Part 20, ``Standards for Protection Against Radiation,'' and 40 CFR Part 190, ``Environmental Radiation Protection Standards for Nuclear Power Operations.'' Environmental Impacts of the...

  12. Survival and weak chaos.

    PubMed

    Nee, Sean

    2018-05-01

    Survival analysis in biology and reliability theory in engineering concern the dynamical functioning of bio/electro/mechanical units. Here we incorporate effects of chaotic dynamics into the classical theory. Dynamical systems theory now distinguishes strong and weak chaos. Strong chaos generates Type II survivorship curves entirely as a result of the internal operation of the system, without any age-independent, external, random forces of mortality. Weak chaos exhibits (a) intermittency and (b) Type III survivorship, defined as a decreasing per capita mortality rate: engineering explicitly defines this pattern of decreasing hazard as 'infant mortality'. Weak chaos generates two phenomena from the normal functioning of the same system. First, infant mortality- sensu engineering-without any external explanatory factors, such as manufacturing defects, which is followed by increased average longevity of survivors. Second, sudden failure of units during their normal period of operation, before the onset of age-dependent mortality arising from senescence. The relevance of these phenomena encompasses, for example: no-fault-found failure of electronic devices; high rates of human early spontaneous miscarriage/abortion; runaway pacemakers; sudden cardiac death in young adults; bipolar disorder; and epilepsy.

  13. Survival and weak chaos

    PubMed Central

    2018-01-01

    Survival analysis in biology and reliability theory in engineering concern the dynamical functioning of bio/electro/mechanical units. Here we incorporate effects of chaotic dynamics into the classical theory. Dynamical systems theory now distinguishes strong and weak chaos. Strong chaos generates Type II survivorship curves entirely as a result of the internal operation of the system, without any age-independent, external, random forces of mortality. Weak chaos exhibits (a) intermittency and (b) Type III survivorship, defined as a decreasing per capita mortality rate: engineering explicitly defines this pattern of decreasing hazard as ‘infant mortality’. Weak chaos generates two phenomena from the normal functioning of the same system. First, infant mortality—sensu engineering—without any external explanatory factors, such as manufacturing defects, which is followed by increased average longevity of survivors. Second, sudden failure of units during their normal period of operation, before the onset of age-dependent mortality arising from senescence. The relevance of these phenomena encompasses, for example: no-fault-found failure of electronic devices; high rates of human early spontaneous miscarriage/abortion; runaway pacemakers; sudden cardiac death in young adults; bipolar disorder; and epilepsy. PMID:29892407

  14. Performance Measurement of Advanced Stirling Convertors (ASC-E3)

    NASA Technical Reports Server (NTRS)

    Oriti, Salvatore M.

    2013-01-01

    NASA Glenn Research Center (GRC) has been supporting development of the Advanced Stirling Radioisotope Generator (ASRG) since 2006. A key element of the ASRG project is providing life, reliability, and performance testing data of the Advanced Stirling Convertor (ASC). The latest version of the ASC (ASC-E3, to represent the third cycle of engineering model test hardware) is of a design identical to the forthcoming flight convertors. For this generation of hardware, a joint Sunpower and GRC effort was initiated to improve and standardize the test support hardware. After this effort was completed, the first pair of ASC-E3 units was produced by Sunpower and then delivered to GRC in December 2012. GRC has begun operation of these units. This process included performance verification, which examined the data from various tests to validate the convertor performance to the product specification. Other tests included detailed performance mapping that encompassed the wide range of operating conditions that will exist during a mission. These convertors were then transferred to Lockheed Martin for controller checkout testing. The results of this latest convertor performance verification activity are summarized here.

  15. Multi-period equilibrium/near-equilibrium in electricity markets based on locational marginal prices

    NASA Astrophysics Data System (ADS)

    Garcia Bertrand, Raquel

    In this dissertation we propose an equilibrium procedure that coordinates the point of view of every market agent resulting in an equilibrium that simultaneously maximizes the independent objective of every market agent and satisfies network constraints. Therefore, the activities of the generating companies, consumers and an independent system operator are modeled: (1) The generating companies seek to maximize profits by specifying hourly step functions of productions and minimum selling prices, and bounds on productions. (2) The goals of the consumers are to maximize their economic utilities by specifying hourly step functions of demands and maximum buying prices, and bounds on demands. (3) The independent system operator then clears the market taking into account consistency conditions as well as capacity and line losses so as to achieve maximum social welfare. Then, we approach this equilibrium problem using complementarity theory in order to have the capability of imposing constraints on dual variables, i.e., on prices, such as minimum profit conditions for the generating units or maximum cost conditions for the consumers. In this way, given the form of the individual optimization problems, the Karush-Kuhn-Tucker conditions for the generating companies, the consumers and the independent system operator are both necessary and sufficient. The simultaneous solution to all these conditions constitutes a mixed linear complementarity problem. We include minimum profit constraints imposed by the units in the market equilibrium model. These constraints are added as additional constraints to the equivalent quadratic programming problem of the mixed linear complementarity problem previously described. For the sake of clarity, the proposed equilibrium or near-equilibrium is first developed for the particular case considering only one time period. Afterwards, we consider an equilibrium or near-equilibrium applied to a multi-period framework. This model embodies binary decisions, i.e., on/off status for the units, and therefore optimality conditions cannot be directly applied. To avoid limitations provoked by binary variables, while retaining the advantages of using optimality conditions, we define the multi-period market equilibrium using Benders decomposition, which allows computing binary variables through the master problem and continuous variables through the subproblem. Finally, we illustrate these market equilibrium concepts through several case studies.

  16. solar thermal power systems advanced solar thermal technology project, advanced subsystems development

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The preliminary design for a prototype small (20 kWe) solar thermal electric generating unit was completed, consisting of several subsystems. The concentrator and the receiver collect solar energy and a thermal buffer storage with a transport system is used to provide a partially smoothed heat input to the Stirling engine. A fossil-fuel combustor is included in the receiver designs to permit operation with partial or no solar insolation (hybrid). The engine converts the heat input into mechanical action that powers a generator. To obtain electric power on a large scale, multiple solar modules will be required to operate in parallel. The small solar electric power plant used as a baseline design will provide electricity at remote sites and small communities.

  17. Operating results of a KU30 diesel cogeneration plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shioda, Kiyoshi; Kakinuma, Takashi; Nishido, Takashi

    1995-11-01

    Diesel cogeneration plants provide high generation ratios, the ability to operate on heavy fuel oil, small space requirements, short delivery terms and easy starting and stopping. The Mitsubishi type KU30 diesel engine is well-suited for meeting the demands of these applications. The KU30 engine (bore 300 x stroke 380 mm) covers an output range from 3500 to 5000 kW at 720 or 750 r/min. Performance results show that total power failures have completely disappeared, thanks to improvements in stable power supply and the reliability of the power source. They also show that the rate of private power generation has accountedmore » for more than 90% of total power consumption in the plant, and that the unit cost of electric power could be reduced by three yen (per kilowatt hour) compared with that of purchased power. This paper describes the design and operating results from a typical plant.« less

  18. Microshutter Array Development for the Multi-Object Spectrograph for the New Generation Space Telescope, and Its Ground-based Demonstrator

    NASA Technical Reports Server (NTRS)

    Woodgate, Bruce E.; Moseley, Harvey; Fettig, Rainer; Kutyrev, Alexander; Ge, Jian; Fisher, Richard R. (Technical Monitor)

    2001-01-01

    The 6.5-m NASA/ESA/Canada New Generation Space Telescope to be operated at the L2 Lagrangian point will require a multi-object spectrograph (MOS) operating from 1 to 5 microns. Up to 3000 targets will be selected for simultaneous spectroscopy using a programmable cryogenic (approx. 35K) aperture array, consisting of a mosaic of arrays of micromirrors or microshutters. We describe the current status of the GSFC microshutter array development. The 100 micron square shutters are opened magnetically and latched open or closed electrostatically. Selection will be by two crossed one-dimensional addressing circuits. We will demonstrate the use of a 512 x 512 unit array on a ground-based IR MOS which will cover 0.6 to 5 microns, and operate rapidly to include spectroscopy of gamma ray burst afterglows.

  19. Biophysically based mathematical modeling of interstitial cells of Cajal slow wave activity generated from a discrete unitary potential basis.

    PubMed

    Faville, R A; Pullan, A J; Sanders, K M; Koh, S D; Lloyd, C M; Smith, N P

    2009-06-17

    Spontaneously rhythmic pacemaker activity produced by interstitial cells of Cajal (ICC) is the result of the entrainment of unitary potential depolarizations generated at intracellular sites termed pacemaker units. In this study, we present a mathematical modeling framework that quantitatively represents the transmembrane ion flows and intracellular Ca2+ dynamics from a single ICC operating over the physiological membrane potential range. The mathematical model presented here extends our recently developed biophysically based pacemaker unit modeling framework by including mechanisms necessary for coordinating unitary potential events, such as a T-Type Ca2+ current, Vm-dependent K+ currents, and global Ca2+ diffusion. Model simulations produce spontaneously rhythmic slow wave depolarizations with an amplitude of 65 mV at a frequency of 17.4 cpm. Our model predicts that activity at the spatial scale of the pacemaker unit is fundamental for ICC slow wave generation, and Ca2+ influx from activation of the T-Type Ca2+ current is required for unitary potential entrainment. These results suggest that intracellular Ca2+ levels, particularly in the region local to the mitochondria and endoplasmic reticulum, significantly influence pacing frequency and synchronization of pacemaker unit discharge. Moreover, numerical investigations show that our ICC model is capable of qualitatively replicating a wide range of experimental observations.

  20. Drinking Water Microbiome as a Screening Tool for ...

    EPA Pesticide Factsheets

    Many water utilities in the US using chloramine as disinfectant treatment in their distribution systems have experienced nitrification episodes, which detrimentally impact the water quality. A chloraminated drinking water distribution system (DWDS) simulator was operated through four successive operational schemes, including two stable events (SS) and an episode of nitrification (SF), followed by a ‘chlorine burn’ (SR) by switching disinfectant from chloramine to free chlorine. The current research investigated the viability of biological signatures as potential indicators of operational failure and predictors of nitrification in DWDS. For this purpose, we examined the bulk water (BW) bacterial microbiome of a chloraminated DWDS simulator operated through successive operational schemes, including an episode of nitrification. BW data was chosen because sampling of BW in a DWDS by water utility operators is relatively simpler and easier than collecting biofilm samples from underground pipes. The methodology applied a supervised classification machine learning approach (naïve Bayes algorithm) for developing predictive models for nitrification. Classification models were trained with biological datasets (Operational Taxonomic Unit [OTU] and genus-level taxonomic groups) generated using next generation high-throughput technology, and divided into two groups (i.e. binary) of positives and negatives (Failure and Stable, respectively). We also invest

  1. Valve Health Monitoring System Utilizing Smart Instrumentation

    NASA Technical Reports Server (NTRS)

    Jensen, Scott L.; Drouant, George J.

    2006-01-01

    The valve monitoring system is a stand alone unit with network capabilities for integration into a higher level health management system. The system is designed for aiding in failure predictions of high-geared ball valves and linearly actuated valves. It performs data tracking and archiving for identifying degraded performance. The data collection types are cryogenic cycles, total cycles, inlet temperature, body temperature torsional strain, linear bonnet strain, preload position, total travel and total directional changes. Events are recorded and time stamped in accordance with the IRIG B True Time. The monitoring system is designed for use in a Class 1 Division II explosive environment. The basic configuration consists of several instrumentation sensor units and a base station. The sensor units are self contained microprocessor controlled and remotely mountable in three by three by two inches. Each unit is potted in a fire retardant substance without any cavities and limited to low operating power for maintaining safe operation in a hydrogen environment. The units are temperature monitored to safeguard against operation outside temperature limitations. Each contains 902-928 MHz band digital transmitters which meet Federal Communication Commission's requirements and are limited to a 35 foot transmission radius for preserving data security. The base-station controller correlates data from the sensor units and generates data event logs on a compact flash memory module for database uploading. The entries are also broadcast over an Ethernet network. Nitrogen purged National Electrical Manufactures Association (NEMA) Class 4 enclosures are used to house the base-station

  2. Valve health monitoring system utilizing smart instrumentation

    NASA Astrophysics Data System (ADS)

    Jensen, Scott L.; Drouant, George J.

    2006-05-01

    The valve monitoring system is a stand alone unit with network capabilities for integration into a higher level health management system. The system is designed for aiding in failure predictions of high-geared ball valves and linearly actuated valves. It performs data tracking and archiving for identifying degraded performance. The data collection types are: cryogenic cycles, total cycles, inlet temperature, outlet temperature, body temperature, torsional strain, linear bonnet strain, preload position, total travel, and total directional changes. Events are recorded and time stamped in accordance with the IRIG B True Time. The monitoring system is designed for use in a Class 1 Division II explosive environment. The basic configuration consists of several instrumentation sensor units and a base station. The sensor units are self contained microprocessor controlled and remotely mountable in three by three by two inches. Each unit is potted in a fire retardant substance without any cavities and limited to low operating power for maintaining safe operation in a hydrogen environment. The units are temperature monitored to safeguard against operation outside temperature limitations. Each contains 902-928 MHz band digital transmitters which meet Federal Communication Commissions requirements and are limited to a 35 foot transmission radius for preserving data security. The base-station controller correlates related data from the sensor units and generates data event logs on a compact flash memory module for database uploading. The entries are also broadcast over an Ethernet network. Nitrogen purged National Electrical Manufactures Association (NEMA) Class 4 Enclosures are used to house the base-station.

  3. An Exploratory Study of Thermoelectrostatic Power Generation for Space Flight Applications

    NASA Technical Reports Server (NTRS)

    Beam, Benjamin H.

    1960-01-01

    A study has been made of a process in which a solar heating cycle is combined with an electrostatic cycle for generating electrical power for space vehicle applications. The power unit, referred to as a thermoelectrostatic generator, is a thin film, solid dielectric capacitor alternately heated by solar radiation and cooled by radiant emission. The theory of operation to extract electrical power is presented. Results of an experiment to illustrate the principle are described. Estimates of the performance of this type of device in space in the vicinity of earth are included. Values of specific power of several kilowatts per kilogram of generator weight are calculated for such a device employing polyethylene terephthalate dielectric.

  4. Carbon monoxide poisoning from portable electric generators.

    PubMed

    Hampson, Neil B; Zmaeff, Jennette L

    2005-01-01

    While the overall death rate from unintentional carbon monoxide (CO) poisoning has decreased in the United States due to improved automobile emissions controls and a decline in CO poisonings from motor vehicles, exposures have not changed from some sources of CO. One of these is the operation of portable electrical generators in poorly ventilated spaces. This study sought to describe the population poisoned from CO produced by portable electric generators, and to determine the reasons that generators are operated in a hazardous fashion. Cases of CO poisoning referred for treatment with hyperbaric oxygen at Virginia Mason Medical Center in Seattle from November 1978 to March 2004 were reviewed. Those cases that resulted from portable generator use were selected for analysis. Sixty-three patients aged 2 to 85 years were treated for CO poisoning from portable electric generators. They included 34 males and 29 females who were poisoned in 37 separate incidents. Thirty-four lost consciousness with the exposure. Of the 63 total patients, 60 spoke English. Generators were typically used when normal electrical service was disrupted by a storm or in remote locations. In 29 of 37 incidents, the generator was operated in the home environment, most commonly in the garage. Lack of awareness of the dangers of CO poisoning or lack of knowledge of ventilation requirements were the most commonly identified reasons. CO poisoning from portable electric generators occurs in a characteristic population, in a few typical locations and for a limited number of reasons. This information may help target prevention efforts for this form of poisoning, such as warning labels or educational programs.

  5. Development of a Small Thermoelectric Generators Prototype for Energy Harvesting from Low Temperature Waste Heat at Industrial Plant.

    PubMed

    Chiarotti, Ugo; Moroli, Valerio; Menchetti, Fernando; Piancaldini, Roberto; Bianco, Loris; Viotto, Alberto; Baracchini, Giulia; Gaspardo, Daniele; Nazzi, Fabio; Curti, Maurizio; Gabriele, Massimiliano

    2017-03-01

    A 39-W thermoelectric generator prototype has been realized and then installed in industrial plant for on-line trials. The prototype was developed as an energy harvesting demonstrator using low temperature cooling water waste heat as energy source. The objective of the research program is to measure the actual performances of this kind of device working with industrial water below 90 °C, as hot source, and fresh water at a temperature of about 15 °C, as cold sink. The article shows the first results of the research program. It was verified, under the tested operative conditions, that the produced electric power exceeds the energy required to pump the water from the hot source and cold sink to the thermoelectric generator unit if they are located at a distance not exceeding 50 m and the electric energy conversion efficiency is 0.33%. It was calculated that increasing the distance of the hot source and cold sink to the thermoelectric generator unit to 100 m the produced electric energy equals the energy required for water pumping, while reducing the distance of the hot source and cold sink to zero meters the developed unit produces an electric energy conversion efficiency of 0.61%.

  6. Methods and strategies for future reactor safety goals

    NASA Astrophysics Data System (ADS)

    Arndt, Steven Andrew

    There have been significant discussions over the past few years by the United States Nuclear Regulatory Commission (NRC), the Advisory Committee on Reactor Safeguards (ACRS), and others as to the adequacy of the NRC safety goals for use with the next generation of nuclear power reactors to be built in the United States. The NRC, in its safety goals policy statement, has provided general qualitative safety goals and basic quantitative health objectives (QHOs) for nuclear reactors in the United States. Risk metrics such as core damage frequency (CDF) and large early release frequency (LERF) have been used as surrogates for the QHOs. In its review of the new plant licensing policy the ACRS has looked at the safety goals, as has the NRC. A number of issues have been raised including what the Commission had in mind when it drafted the safety goals and QHOs, how risk from multiple reactors at a site should be combined for evaluation, how the combination of a new and old reactor at the same site should be evaluated, what the criteria for evaluating new reactors should be, and whether new reactors should be required to be safer than current generation reactors. As part of the development and application of the NRC safety goal policy statement the Commissioners laid out the expectations for the safety of a nuclear power plant but did not address the risk associated with current multi-unit sites, potential modular reactor sites, and hybrid sites that could contain current generation reactors, new passive reactors, and/or modular reactors. The NRC safety goals and the QHOs refer to a "nuclear power plant," but do not discuss whether a "plant" refers to only a single unit or all of the units on a site. There has been much discussion on this issue recently due to the development of modular reactors. Additionally, the risk of multiple reactor accidents on the same site has been largely ignored in the probabilistic risk assessments (PRAs) done to date, and in most risk-informed analyses and discussions. This dissertation examines potential approaches to updating the safety goals that include the establishment of new quantitative safety goal associated with the comparative risk of generating electricity by viable competing technologies and modifications of the goals to account for multi-plant reactor sites, and issues associated with the use of safety goals in both initial licensing and operational decision making. This research develops a new quantitative health objective that uses a comparable benefit risk metric based on the life-cycle risk of the construction, operation and decommissioning of a comparable non-nuclear electric generation facility, as well as the risks associated with mining and transportation. This dissertation also evaluates the effects of using various methods for aggregating site risk as a safety metric, as opposed to using single plant safety goals. Additionally, a number of important assumptions inherent in the current safety goals, including the effect of other potential negative societal effects such as the generation of greenhouse gases (e.g., carbon dioxide) have on the risk of electric power production and their effects on the setting of safety goals, is explored. Finally, the role risk perception should play in establishing safety goals has been explored. To complete this evaluation, a new method to analytically compare alternative technologies of generating electricity was developed, including development of a new way to evaluate risk perception, and a new method was developed for evaluating the risk at multiple units on a single site. To test these modifications to the safety goals a number of possible reactor designs and configurations were evaluated using these new proposed safety goals to determine the goals' usefulness and utility. The results of the analysis showed that the modifications provide measures that more closely evaluate the potential risk to the public from the operation of nuclear power plants than the current safety goals, while still providing a straight-forward process for assessment of reactor design and operation.

  7. A Study on Performance and Safety Tests of Electrosurgical Equipment.

    PubMed

    Tavakoli Golpaygani, A; Movahedi, M M; Reza, M

    2016-09-01

    Modern medicine employs a wide variety of instruments with different physiological effects and measurements. Periodic verifications are routinely used in legal metrology for industrial measuring instruments. The correct operation of electrosurgical generators is essential to ensure patient's safety and management of the risks associated with the use of high and low frequency electrical currents on human body. The metrological reliability of 20 electrosurgical equipment in six hospitals (3 private and 3 public) was evaluated in one of the provinces of Iran according to international and national standards. The achieved results show that HF leakage current of ground-referenced generators are more than isolated generators and the power analysis of only eight units delivered acceptable output values and the precision in the output power measurements was low. Results indicate a need for new and severe regulations on periodic performance verifications and medical equipment quality control program especially in high risk instruments. It is also necessary to provide training courses for operating staff in the field of meterology in medicine to be acquianted with critical parameters to get accuracy results with operation room equipment.

  8. Extruder system for high-throughput/steady-state hydrogen ice supply and application for pellet fueling of reactor-scale fusion experiments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Combs, S.K.; Foust, C.R.; Qualls, A.L.

    Pellet injection systems for the next-generation fusion devices, such as the proposed International Thermonuclear Experimental Reactor (ITER), will require feed systems capable of providing a continuous supply of hydrogen ice at high throughputs. A straightforward concept in which multiple extruder units operate in tandem has been under development at the Oak Ridge National Laboratory. A prototype with three large-volume extruder units has been fabricated and tested in the laboratory. In experiments, it was found that each extruder could provide volumetric ice flow rates of up to {approximately}1.3 cm{sup 3}/s (for {approximately}10 s), which is sufficient for fueling fusion reactors atmore » the gigawatt power level. With the three extruders of the prototype operating in sequence, a steady rate of {approximately}0.33 cm{sup 3}/s was maintained for a duration of 1 h. Even steady-state rates approaching the full ITER design value ({approximately}1 cm{sup 3}/s) may be feasible with the prototype. However, additional extruder units (1{endash}3) would facilitate operations at the higher throughputs and reduce the duty cycle of each unit. The prototype can easily accommodate steady-state pellet fueling of present large tokamaks or other near-term plasma experiments.« less

  9. Commutative Algebras of Toeplitz Operators in Action

    NASA Astrophysics Data System (ADS)

    Vasilevski, Nikolai

    2011-09-01

    We will discuss a quite unexpected phenomenon in the theory of Toeplitz operators on the Bergman space: the existence of a reach family of commutative C*-algebras generated by Toeplitz operators with non-trivial symbols. As it tuns out the smoothness properties of symbols do not play any role in the commutativity, the symbols can be merely measurable. Everything is governed here by the geometry of the underlying manifold, the hyperbolic geometry of the unit disk. We mention as well that the complete characterization of these commutative C*-algebras of Toeplitz operators requires the Berezin quantization procedure. These commutative algebras come with a powerful research tool, the spectral type representation for the operators under study, which permit us to answer to many important questions in the area.

  10. 22. Blow Down Valve for Unit 1, view to the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. Blow Down Valve for Unit 1, view to the southwest. This valve allows the water in the draft chest to be lowered (i.e., 'blown down') so that the unit can be motored (i.e., run like an electric motor rather than an electric power generator). The valve is operated by pressure from the instrument air system (part of which is visible in photograph MT-105-A-17 above), but the unit draws on the station air system (see photograph MT-105-A-24 below) to lower the water in the draft chest. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT

  11. Characteristics of NOx emission from Chinese coal-fired power plants equipped with new technologies

    NASA Astrophysics Data System (ADS)

    Ma, Zizhen; Deng, Jianguo; Li, Zhen; Li, Qing; Zhao, Ping; Wang, Liguo; Sun, Yezhu; Zheng, Hongxian; Pan, Li; Zhao, Shun; Jiang, Jingkun; Wang, Shuxiao; Duan, Lei

    2016-04-01

    Coal combustion in coal-fired power plants is one of the important anthropogenic NOx sources, especially in China. Many policies and methods aiming at reducing pollutants, such as increasing installed capacity and installing air pollution control devices (APCDs), especially selective catalytic reduction (SCR) units, could alter NOx emission characteristics (NOx concentration, NO2/NOx ratio, and NOx emission factor). This study reported the NOx characteristics of eight new coal-fired power-generating units with different boiler patterns, installed capacities, operating loads, and coal types. The results showed that larger units produced less NOx, and anthracite combustion generated more NOx than bitumite and lignite combustion. During formation, the NOx emission factors varied from 1.81 to 6.14 g/kg, much lower than those of older units at similar scales. This implies that NOx emissions of current and future units could be overestimated if they are based on outdated emission factors. In addition, APCDs, especially SCR, greatly decreased NOx emissions, but increased NO2/NOx ratios. Regardless, the NO2/NOx ratios were lower than 5%, in accordance with the guidelines and supporting the current method for calculating NOx emissions from coal-fired power plants that ignore NO2.

  12. Turbine and superheater bypass evaluation. Final report. [Faster startup in cycling operation and less erosion with steam bypass systems, including bypass design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rosard, D.D.; Steltz, W.G.

    1986-10-01

    Properly sized turbine and boiler bypass systems permit two-shift cycling operation of units, shorten start-up time, and reduce life expenditures of plant components. With bypasses installed, faster startups can reduce fuel costs by $100,000 per year for a typical 500-MW fossil-fired unit. This report discusses the technical characteristics of existing bypass systems and provides guidelines for sizing bypass systems to achieve economical and reliable two-shift operation. The collection and analysis of startup data from several generating units were used in conjunction with computer simulations to illustrate the effects of adding various arrangements and sizes of steam bypass systems. The report,more » which indicates that shutdown procedures have significant impact on subsequent startup and loading time, describes operating practices to optimize the effectiveness of bypass systems. To determine the effectiveness of large turbine bypass systems of less than 100% capacity in preventing boiler trips following load rejection, transient field data were compared to a load rejection simulation using the modular modeling system (MMS). The MMS was then used to predict system response to other levels of load rejection. 7 refs., 87 figs., 8 tabs.« less

  13. Diesel fuel to dc power: Navy & Marine Corps Applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bloomfield, D.P.

    1996-12-31

    During the past year Analytic Power has tested fuel cell stacks and diesel fuel processors for US Navy and Marine Corps applications. The units are 10 kW demonstration power plants. The USN power plant was built to demonstrate the feasibility of diesel fueled PEM fuel cell power plants for 250 kW and 2.5 MW shipboard power systems. We designed and tested a ten cell, 1 kW USMC substack and fuel processor. The complete 10 kW prototype power plant, which has application to both power and hydrogen generation, is now under construction. The USN and USMC fuel cell stacks have beenmore » tested on both actual and simulated reformate. Analytic Power has accumulated operating experience with autothermal reforming based fuel processors operating on sulfur bearing diesel fuel, jet fuel, propane and natural gas. We have also completed the design and fabrication of an advanced regenerative ATR for the USMC. One of the significant problems with small fuel processors is heat loss which limits its ability to operate with the high steam to carbon ratios required for coke free high efficiency operation. The new USMC unit specifically addresses these heat transfer issues. The advances in the mill programs have been incorporated into Analytic Power`s commercial units which are now under test.« less

  14. Valuing natural gas power generation assets in the new competitive marketplace

    NASA Astrophysics Data System (ADS)

    Hsu, Michael Chun-Wei

    1999-10-01

    The profitability of natural gas fired power plants depends critically on the spread between electricity and natural gas prices. The price levels of these two energy commodities are the key uncertain variables in determining the operating margin and therefore the value of a power plant. The owner of a generation unit has the decision of dispatching the plant only when profit margins are positive. This operating flexibility is a real option with real value. In this dissertation I introduce the spark spread call options and illustrate how such paper contracts replicate the uncertain payoff space facing power asset owners and, therefore, how the financial options framework can be applied in estimating the value of natural gas generation plants. The intrinsic value of gas power plants is approximated as the sum of a series of spark spread call options with succeeding maturity dates. The Black-Scholes spread option pricing model, with volatility and correlation term structure adjustments, is utilized to price the spark spread options. Sensitivity analysis is also performed on the BS spread option formulation to compare different asset types. In addition I explore the potential of using compound and compound-exchange option concepts to evaluate, respectively, the benefits of delaying investment in new generation and in repowering existing antiquated units. The compound option designates an option on top of another option. In this case the series of spark spread call options is the 'underlying' option while the option to delay new investments is the 'overlying.' The compound-exchange option characterizes the opportunity to 'exchange' the old power plant, with its series of spark spread call options, for a set of new spark spread call options that comes with the new generation unit. The strike price of the compound-exchange option is the repowering capital investment and typically includes the purchase of new steam generators and combustion turbines, as well as other facility upgrades. The pricing results using the proposed repowering option approach is compared to the sale prices from recent power plant auctions. Sensitivity of the repowering option model is also examined and the critical parameters al parameters identified.

  15. Electric plant cost and power production expenses 1989. [Glossary included

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-03-29

    This publication presents electric utility statistics on power production expenses and construction costs of electric generating plants. Data presented here are intended to provide information to the electric utility industry, educational institutions, federal, state, and local governments, and the general public. This report primarily presents aggregate operation, maintenance, and fuel expense data about all power plants owned and operated by the major investor-owned electric utilities in the United States. The power production expenses for the major investor-owned electric utilities are summarized. Plant-specific data are presented for a selection of both investor-owned and publicly owned plants. Summary statistics for each plantmore » type (prime mover), as reported by the electric utilities, are presented in the separate chapters as follows: Hydroelectric Plants; Fossil-Fueled Steam-Electric Plants; Nuclear Steam-Electric Plants; and Gas Turbine and Small Scale Electric Plants. These chapters contain plant level data for 50 conventional hydroelectric plants and 22 pumped storage hydroelectric plants, 50 fossil-fueled steam-electric plants, 71 nuclear steam-electric plants, and 50 gas turbine electric plants. Among the operating characteristics of each plant are the capacity, capability, generation and demand on the plant. Physical characteristics comprise the number of units in the plant, the average number of employees, and other information relative to the plant's operation. The Glossary section will enable the reader to understand clearly the terms used in this report. 4 figs., 18 tabs.« less

  16. Field test report of the Department of Energy's 100-kW vertical axis wind turbine

    NASA Astrophysics Data System (ADS)

    Nellums, R. O.

    1985-02-01

    Three second generation Darrieus type vertical axis wind turbines of approximately 120 kW capacity per unit were installed in 1980-1981. Through March 1984, over 9000 hours of operation had been accumulated, including 6600 hours of operation on the unit installed in Bushland, Texas. The turbines were heavily instrumented and have yielded a large amount of test data. Test results of this program, including aerodynamic, structural, drive train, and economic data are presented. Among the most favorable results were an aerodynamic peak performance coefficient of 0.41; fundamental structural integrity requiring few repairs and no major component replacements as of March 1984; and an average prototype fabrication cost of approximately $970 per peak kilowatt of output. A review of potential design improvements is presented.

  17. Applications of Geostationary Satellite Data to Aviation

    NASA Astrophysics Data System (ADS)

    Ellrod, Gary P.; Pryor, Kenneth

    2018-03-01

    Weather is by far the most important factor in air traffic delays in the United States' National Airspace System (NAS) according to the Federal Aviation Administration (FAA). Geostationary satellites have been an effective tool for the monitoring of meteorological conditions that affect aviation operations since the launch of the first Synchronous Meteorological Satellite (SMS) in the United States in 1974. This paper will review the global use of geostationary satellites in support of aviation weather since their inception, with an emphasis on the latest generation of satellites, such as Geostationary Operational Environmental Satellite (GOES)-R (16) with its Advanced Baseline Imager (ABI) and Geostationary Lightning Mapper (GLM). Specific applications discussed in this paper include monitoring of convective storms and their associated hazards, fog and low stratus, turbulence, volcanic hazards, and aircraft icing.

  18. 78 FR 49551 - Vogtle Electric Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Change to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-14

    ... design and layout of the turbine building. As part of this request, the licensee needed to change the... information related to the design and layout of the Turbine Building detailed in the amendment request. These... Structures and Layout AGENCY: Nuclear Regulatory Commission. ACTION: Exemption and combined license amendment...

  19. 75 FR 12449 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Amendment to Electric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-16

    ... it modifies the sulfur dioxide (SO 2 ) mass emissions limit associated with Conectiv Edge Moor Unit 5... of future operations using the low sulfur (0.5%) residual fuel to generate electricity at the 446... SIP concerning an amendment, which modifies the SO 2 mass emissions limit associated with Conectiv...

  20. Cantor Groups

    ERIC Educational Resources Information Center

    Mathes, Ben; Dow, Chris; Livshits, Leo

    2011-01-01

    The Cantor subset of the unit interval [0, 1) is "large" in cardinality and also "large" algebraically, that is, the smallest subgroup of [0, 1) generated by the Cantor set (using addition mod 1 as the group operation) is the whole of [0, 1). In this paper, we show how to construct Cantor-like sets which are "large" in cardinality but "small"…

  1. GOES-R Uncrating and Move to Vertical

    NASA Image and Video Library

    2016-08-23

    Team members remove a protective plastic covering from the GOES-R spacecraft inside the Astrotech payload processing facility in Titusville, Florida near NASA’s Kennedy Space Center. GOES-R will be the first satellite in a series of next-generation NOAA Geostationary Operational Environmental Satellites. The spacecraft is to launch aboard a United Launch Alliance Atlas V rocket in November.

  2. GOES-R Uncrating and Move to Vertical

    NASA Image and Video Library

    2016-08-23

    The shipping container is lifted off the GOES-R spacecraft inside the Astrotech payload processing facility in Titusville, Florida near NASA’s Kennedy Space Center. GOES-R will be the first satellite in a series of next-generation NOAA Geostationary Operational Environmental Satellites. The spacecraft is to launch aboard a United Launch Alliance Atlas V rocket in November.

  3. GOES-R Lift to Stand

    NASA Image and Video Library

    2016-08-23

    An overhead crane moves the GOES-R spacecraft toward its work stand inside the Astrotech payload processing facility in Titusville, Florida near NASA’s Kennedy Space Center. GOES-R will be the first satellite in a series of next-generation NOAA Geostationary Operational Environmental Satellites. The spacecraft is to launch aboard a United Launch Alliance Atlas V rocket in November.

  4. GOES-R Uncrating and Move to Vertical

    NASA Image and Video Library

    2016-08-23

    The GOES-R spacecraft is revealed following its uncrating inside the Astrotech payload processing facility in Titusville, Florida near NASA’s Kennedy Space Center. GOES-R will be the first satellite in a series of next-generation NOAA Geostationary Operational Environmental Satellites. The spacecraft is to launch aboard a United Launch Alliance Atlas V rocket in November.

  5. GOES-R Encapsulation

    NASA Image and Video Library

    2016-10-21

    The two halves of the payload fairing are fully closed around the Geostationary Operational Environmental Satellite (GOES-R) inside the Astrotech payload processing facility in Titusville, Florida near NASA’s Kennedy Space Center. GOES-R will be the first satellite in a series of next-generation NOAA GOES Satellites. The spacecraft is to launch aboard a United Launch Alliance Atlas V rocket in November.

  6. 76 FR 24064 - Arizona Public Service Company, Palo Verde Nuclear Generating Station, Units 1, 2, and 3, Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-29

    ... Decision Notice is hereby given that the U.S. Nuclear Regulatory Commission (NRC, the Commission) has... notice also serves as the record of decision for Renewed Facility Operating License Nos. NPF-41, NPF-51... Decision--General.'' NUREG-1437, ``Generic Environmental Impact Statement for License Renewal of Nuclear...

  7. 14 CFR 135.91 - Oxygen for medical use by passengers.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Oxygen for medical use by passengers. 135... Operations § 135.91 Oxygen for medical use by passengers. (a) Except as provided in paragraphs (d) and (e) of..., generation or dispensing of medical oxygen unless the unit to be carried is constructed so that all valves...

  8. 14 CFR 135.91 - Oxygen for medical use by passengers.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Oxygen for medical use by passengers. 135... Operations § 135.91 Oxygen for medical use by passengers. (a) Except as provided in paragraphs (d) and (e) of..., generation or dispensing of medical oxygen unless the unit to be carried is constructed so that all valves...

  9. 14 CFR 135.91 - Oxygen for medical use by passengers.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Oxygen for medical use by passengers. 135... Operations § 135.91 Oxygen for medical use by passengers. (a) Except as provided in paragraphs (d) and (e) of..., generation or dispensing of medical oxygen unless the unit to be carried is constructed so that all valves...

  10. 14 CFR 135.91 - Oxygen for medical use by passengers.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Oxygen for medical use by passengers. 135... Operations § 135.91 Oxygen for medical use by passengers. (a) Except as provided in paragraphs (d) and (e) of..., generation or dispensing of medical oxygen unless the unit to be carried is constructed so that all valves...

  11. 14 CFR 135.91 - Oxygen for medical use by passengers.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Oxygen for medical use by passengers. 135... Operations § 135.91 Oxygen for medical use by passengers. (a) Except as provided in paragraphs (d) and (e) of..., generation or dispensing of medical oxygen unless the unit to be carried is constructed so that all valves...

  12. GOES-R Rollout from VIF to Pad 41

    NASA Image and Video Library

    2016-11-18

    A United Launch Alliance Atlas V rocket arrives at Space Launch Complex 41 at Cape Canaveral Air Force Station in Florida. The launch vehicle will send the Geostationary Operational Environmental Satellite (GOES-R) to a geostationary position over the U.S. GOES-R is the first satellite in a series of next-generation NOAA GOES satellites.

  13. 76 FR 21787 - Bureau of Political-Military Affairs: Directorate of Defense Trade Controls; Notifications to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-18

    ... for the manufacture of electrical generator products for various aircraft owned by the Japanese... for use in US-2 search and rescue aircraft owned and operated by the Japanese Ministry of Defense. The... the Japanese Ministry of Defense. The United States Government is prepared to license the export of...

  14. OPTIMAL OPERATION OF ELECTRIC ARC FURNACES (EAF) TO MINIMIZE THE GENERATION OF AIR POLLUTANTS AT THE SOURCE

    EPA Science Inventory

    The manufacture of steel by electric arc furnaces (EAF) is continuing to increase in usage in the United States with current production estimated to be over 63 million tons per year. The reduction of emissions from steel producers has been slow for two main reasons: the nee...

  15. 75 FR 16518 - Florida Power Corporation, et al.; Crystal River Unit 3 Nuclear Generating Plant; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-01

    ... generically extend the rule's compliance date for all operating nuclear power plants, but noted that the..., Nuclear Energy Institute). The licensee's request for an exemption is therefore consistent with the... of this exemption will not have a significant effect on the quality of the human environment (75 FR...

  16. 75 FR 15745 - Arizona Public Service Company, et al. Palo Verde Nuclear Generating Station, Units 1, 2, and 3...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-30

    ... rule's compliance date for all operating nuclear power plants, but noted that the Commission's... compliance date as documented in a letter from R.W. Borchardt, (NRC), to M.S. Fertel, (Nuclear Energy... Commission (NRC, or the Commission) now or hereafter in effect. The facility consists of three pressurized...

  17. 75 FR 16872 - Indian Point Nuclear Generating Unit Nos. 1, 2, and 3; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-02

    ... rule's compliance date for all operating nuclear power plants, but noted that the Commission's... compliance date (Reference: June 4, 2009, letter from R. W. Borchardt, NRC, to M. S. Fertel, Nuclear Energy... significant effect on the quality of the human environment (75 FR 14639; dated March 26, 2010). This exemption...

  18. 75 FR 70953 - Florida Power Corporation, et al.; Crystal River Unit 3 Nuclear Generating Plant; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-19

    ... rule's compliance date for all operating nuclear power plants, but noted that the Commission's... compliance date (Reference: June 4, 2009, letter from R. W. Borchardt, NRC, to M. S. Fertel, Nuclear Energy... Commission (NRC, the Commission) now or hereafter in effect. The facility consists of one pressurized-water...

  19. 75 FR 9103 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; NOX

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-01

    ... State Implementation Plan (SIP) that would terminate the provisions of the Nitrogen Oxides (NO X ) Budget Trading Program that apply to electric generating units. EPA is no longer operating the NO X Budget Trading Program as a compliance option under the NO X SIP Call. These sources are now subject to...

  20. 75 FR 9146 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; NOX

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-01

    ... Illinois State Implementation Plan (SIP) that would terminate the provisions of the Nitrogen Oxides (NO X ) Budget Trading Program that apply to electric generating units. EPA is no longer operating the NO X Budget Trading Program as a compliance option under the NO X SIP Call. These sources are now subject to...

  1. Understanding and Supporting Visual Communication within Costume Design Practice

    ERIC Educational Resources Information Center

    Bradley, Rachael Leigh

    2009-01-01

    Theatres provide artistic value to many people and generate revenue for communities, yet little research has been conducted to understand or support theatrical designers. Over 1,800 non-profit theatres and 3,522 theatre companies and dinner theatres operate in the United States. In 2008, 11 million people attended 1,587 Broadway shows for a total…

  2. Operations Studies of the Gyrotrons on DIII-D

    NASA Astrophysics Data System (ADS)

    Storment, Stephen; Lohr, John; Cengher, Mirela; Gorelov, Yuri; Ponce, Dan; Torrezan, Antonio

    2017-10-01

    The gyrotrons are high power vacuum tubes used in fusion research to provide high power density heating and current drive in precisely localized areas of the plasma. Despite the increasing experience with both the manufacture and operation of these devices, individual gyrotrons with similar design and manufacturing processes can exhibit important operational differences in terms of generated rf power, efficiency and lifetime. This report discusses differences in the performance of several gyrotrons in operation at DIII-D and presents the results of a series of measurements that could lead to improved the performance of single units based on a better understanding of the causes of these differences. The rf power generation efficiency can be different from gyrotron to gyrotron. In addition, the power loading of the collector can feature localized hot spots, where the collector can locally be close to the power deposition limits. Measurements of collector power loading provide maps of the power deposition and can provide understanding of the effect of modulation of the output rf beam on the total loading, leading to improved operational rules increasing the safety margins for the gyrotrons under different operational scenarios. Work supported by US DOE under DE-FC02-04ER54698.

  3. Near-term implications of a ban on new coal-fired power plants in the United States.

    PubMed

    Newcomer, Adam; Apt, Jay

    2009-06-01

    Large numbers of proposed new coal power generators in the United States have been canceled, and some states have prohibited new coal power generators. We examine the effects on the U.S. electric power system of banning the construction of coal-fired electricity generators, which has been proposed as a means to reduce U.S. CO2 emissions. The model simulates load growth, resource planning, and economic dispatch of the Midwest Independent Transmission System Operator (ISO), Inc., Electric Reliability Council of Texas (ERCOT), and PJM under a ban on new coal generation and uses an economic dispatch model to calculate the resulting changes in dispatch order, CO2 emissions, and fuel use under three near-term (until 2030) future electric power sector scenarios. A national ban on new coal-fired power plants does not lead to CO2 reductions of the scale required under proposed federal legislation such as Lieberman-Warner but would greatly increase the fraction of time when natural gas sets the price of electricity, even with aggressive wind and demand response policies.

  4. An artificial neural network model for periodic trajectory generation

    NASA Astrophysics Data System (ADS)

    Shankar, S.; Gander, R. E.; Wood, H. C.

    A neural network model based on biological systems was developed for potential robotic application. The model consists of three interconnected layers of artificial neurons or units: an input layer subdivided into state and plan units, an output layer, and a hidden layer between the two outer layers which serves to implement nonlinear mappings between the input and output activation vectors. Weighted connections are created between the three layers, and learning is effected by modifying these weights. Feedback connections between the output and the input state serve to make the network operate as a finite state machine. The activation vector of the plan units of the input layer emulates the supraspinal commands in biological central pattern generators in that different plan activation vectors correspond to different sequences or trajectories being recalled, even with different frequencies. Three trajectories were chosen for implementation, and learning was accomplished in 10,000 trials. The fault tolerant behavior, adaptiveness, and phase maintenance of the implemented network are discussed.

  5. Design of structure and simulation of the three-zone gasifier of dense layer of the inverted process

    NASA Astrophysics Data System (ADS)

    Zagrutdinov, R. Sh; Negutorov, V. N.; Maliykhin, D. G.; Nikishanin, M. S.; Senachin, P. K.

    2017-11-01

    Experts of LLC “New Energy Technologies” have developed gasifiers designs, with the implementation of the three-zone gasification method, which satisfy the following conditions: 1) the generated gas must be free from tar, soot and hydrocarbons, with a given ratio of CO/H2; 2) to use as the fuel source a wide range of low-grade low-value solid fuels, including biomass and various kinds of carbonaceous wastes; 3) have high reliability in operation, do not require qualified operating personnel, be relatively inexpensive to produce and use steam-air blowing instead of expensive steam-oxygen one; 4) the line of standard sizes should be sufficiently wide (with a single unit capacity of fuel from 1 to 50-70 MW). Two models of gas generators of the inverted gasification process with three combustion zones operating under pressure have been adopted for design: 1) gas generator with a remote combustion chamber type GOP-VKS (two-block version) and 2) a gas generator with a common combustion chamber of the GOP-OK type (single-block version), which is an almost ideal model for increasing the unit capacity. There have been worked out various schemes for the preparation of briquettes from practically the entire spectrum of low-grade fuel: high-ash and high-moisture coals, peat and biomass, including all types of waste - solid household waste, crop, livestock, poultry, etc. In the gas generators there are gasified the cylindrical briquettes with a diameter of 20-25 mm and a length of 25-35 mm. There have been developed a mathematical model and computer code for numerical simulation of synthesis gas generation processes in a gasifier of a dense layer of inverted process during a steam-air blast, including: continuity equations for the 8 gas phase components and for the solid phase; the equation of the heat balance for the entire heterogeneous system; the Darcy law equation (for porous media); equation of state for 8 components of the gas phase; equations for the rates of 3 gas-phase and 4 heterogeneous reactions; macro kinetics law of coke combustion; other equations and boundary conditions.

  6. Anode regeneration following carbon depositions in an industrial-sized anode supported solid oxide fuel cell operating on synthetic diesel reformate

    NASA Astrophysics Data System (ADS)

    Subotić, Vanja; Schluckner, Christoph; Mathe, Jörg; Rechberger, Jürgen; Schroettner, Hartmuth; Hochenauer, Christoph

    2015-11-01

    Carbon deposition is a primary concern during operation of solid oxide fuel cells (SOFCs) fueled with carbon-containing fuels. It leads to cell degradation and thus reduces SOFC sustained operation and durability. This paper reports on an experimental investigation of carbon formation on the nickel/yttria-stabilized zirconia (Ni/YSZ) anode of an anode-supported SOFC and its regeneration. The cell was fueled with a synthetically produced diesel reformate to investigate and simulate the cell behavior under real operating conditions. For this purpose the cell was operated under load to determine the critical operating time. Rapid carbon generation, such as at open circuit voltage (OCV), can be prevented when the cell is under load. Carbon depositions were detected using scanning electron microscopy (SEM) and further analyzed by Raman spectroscopy. Industrial-size cells suitable for commercial applications were studied. This study proves the reversibility of carbon formation and the reproducibility of the regeneration process. It shows that carbon formations can be recognized and effectively, fully and cell-protecting regenerated. It indicates the excellent possibility of using SOFCs in the automotive industry as an auxiliary power unit (APU) or combined power-heat unit, operated with diesel reformate, without danger from cell degradation caused by carbon-containing fuels.

  7. Evaluation of an Atmosphere Revitalization Subsystem for Deep Space Exploration Missions

    NASA Technical Reports Server (NTRS)

    Perry, Jay L.; Abney, Morgan B.; Conrad, Ruth E.; Frederick, Kenneth R.; Greenwood, Zachary W.; Kayatin, Matthew J.; Knox, James C.; Newton, Robert L.; Parrish, Keith J.; Takada, Kevin C.; hide

    2015-01-01

    An Atmosphere Revitalization Subsystem (ARS) suitable for deployment aboard deep space exploration mission vehicles has been developed and functionally demonstrated. This modified ARS process design architecture was derived from the International Space Station's (ISS) basic ARS. Primary functions considered in the architecture include trace contaminant control, carbon dioxide removal, carbon dioxide reduction, and oxygen generation. Candidate environmental monitoring instruments were also evaluated. The process architecture rearranges unit operations and employs equipment operational changes to reduce mass, simplify, and improve the functional performance for trace contaminant control, carbon dioxide removal, and oxygen generation. Results from integrated functional demonstration are summarized and compared to the performance observed during previous testing conducted on an ISS-like subsystem architecture and a similarly evolved process architecture. Considerations for further subsystem architecture and process technology development are discussed.

  8. Experimental Results From a 2kW Brayton Power Conversion Unit

    NASA Technical Reports Server (NTRS)

    Hervol, David; Mason, Lee; Birchenough, Arthur

    2003-01-01

    This paper presents experimental test results from operation of a 2 kWe Brayton power conversion unit. The Brayton converter was developed for a solar dynamic power system flight experiment planned for the Mir Space Station in 1997. The flight experiment was cancelled, but the converter was tested at Glenn Research Center as part of the Solar Dynamic Ground Test Demonstration system which included a solar concentrator, heat receiver, and space radiator. In preparation for the current testing, the heat receiver was removed and replaced with an electrical resistance heater, simulating the thermal input of a steady-state nuclear source. The converter was operated over a full range of thermal input power levels and rotor speeds to generate an overall performance map. The converter unit will serve as the centerpiece of a Nuclear Electric Propulsion Testbed at Glenn. Future potential uses for the Testbed include high voltage electrical controller development, integrated electric thruster testing and advanced radiator demonstration testing to help guide high power Brayton technology development for Nuclear Electric Propulsion (NEP).

  9. Managing waste from confined animal feeding operations in the United States: the need for sanitary reform.

    PubMed

    Graham, Jay P; Nachman, Keeve E

    2010-12-01

    Confined food-animal operations in the United States produce more than 40 times the amount of waste than human biosolids generated from US wastewater treatment plants. Unlike biosolids, which must meet regulatory standards for pathogen levels, vector attraction reduction and metal content, no treatment is required of waste from animal agriculture. This omission is of concern based on dramatic changes in livestock production over the past 50 years, which have resulted in large increases in animal waste and a high degree of geographic concentration of waste associated with the regional growth of industrial food-animal production. Regulatory measures have not kept pace with these changes. The purpose of this paper is to: 1) review trends that affect food-animal waste production in the United States, 2) assess risks associated with food-animal wastes, 3) contrast food-animal waste management practices to management practices for biosolids and 4) make recommendations based on existing and potential policy options to improve management of food-animal waste.

  10. Environmental Assessment: BRAC Construction and Operation of Armed Forces Reserve Center at Malmstrom Air Force Base, Great Falls, Montana

    DTIC Science & Technology

    2009-06-01

    Day-Night Levels in Urban Areas in the United States .................................4-31 4-5 Typical Construction Equipment and Composite Site...ramp 2 Reefer 4 1.5-ton Trailer 1 2.5-ton Trailer 1 5-ton Trailer 4 Mobile Kitchen Trailer 1 4-kilovolt (kV) Generator sets 3 10-kV generator...encountered in urban areas of the U.S. In general, 30 to 50 dB represents a quiet classification, 65 to 70 dB represents a moderately noisy

  11. Malleable architecture generator for FPGA computing

    NASA Astrophysics Data System (ADS)

    Gokhale, Maya; Kaba, James; Marks, Aaron; Kim, Jang

    1996-10-01

    The malleable architecture generator (MARGE) is a tool set that translates high-level parallel C to configuration bit streams for field-programmable logic based computing systems. MARGE creates an application-specific instruction set and generates the custom hardware components required to perform exactly those computations specified by the C program. In contrast to traditional fixed-instruction processors, MARGE's dynamic instruction set creation provides for efficient use of hardware resources. MARGE processes intermediate code in which each operation is annotated by the bit lengths of the operands. Each basic block (sequence of straight line code) is mapped into a single custom instruction which contains all the operations and logic inherent in the block. A synthesis phase maps the operations comprising the instructions into register transfer level structural components and control logic which have been optimized to exploit functional parallelism and function unit reuse. As a final stage, commercial technology-specific tools are used to generate configuration bit streams for the desired target hardware. Technology- specific pre-placed, pre-routed macro blocks are utilized to implement as much of the hardware as possible. MARGE currently supports the Xilinx-based Splash-2 reconfigurable accelerator and National Semiconductor's CLAy-based parallel accelerator, MAPA. The MARGE approach has been demonstrated on systolic applications such as DNA sequence comparison.

  12. Evaluation of Gas Chromatography/Mini-IMS to Detect VOCs

    NASA Technical Reports Server (NTRS)

    Limero, Thomas; Reese, Eric; Peters, Randy; James, John T.; Billica, Roger (Technical Monitor)

    1999-01-01

    The Toxicology Laboratory at Johnson Space Center (JSC) has pioneered the use of gas chromatography-ion mobility spectrometry (GC/IMS) for measuring target volatile organic compounds (VOCs) aboard spacecraft. Graseby Dynamics, under contract to NASA/Wyle, has built several volatile organic analyzers (VOA) based on GC/IMS. Foremost among these have been the volatile organic analyzer-risk mitigation unit and the two flight VOA units for International Space Station (ISS). The development and evaluation of these instruments has been chronicled through presentations at the International Conference on Ion Mobility Spectrometry over the past three years. As the flight VOA from Graseby is prepared for operation on ISS at JSC, it is time to begin evaluations of technologies for the next generation VOA, Although the desired instrument characteristics for the next generation unit are the same as the current unit, the requirements are much more stringent. As NASA looks toward future missions beyond Earth environs, a premium will be placed upon small, light, reliable, autonomous hardware. It is with these visions in mind that the JSC Toxicology Laboratory began a search for the next generation VOA. One technology that is a candidate for the next generation VOA is GC/IMS. The recent miniaturization of IMS technology permits it to compete with other, inherently small, technologies such as chip-sized sensor arrays. This paper will discuss the lessons learned from the VOA experience and how that has shaped the design of a potential second generation VOA based upon GC/IMS technology. Data will be presented from preliminary evaluations of GC technology and the mini-IMS when exposed to VOCs likely to be detected aboard spacecraft. Results from the evaluation of an integrated GC/mini-IMS system will be shown if available.

  13. Stratified charge rotary engine for general aviation

    NASA Technical Reports Server (NTRS)

    Mount, R. E.; Parente, A. M.; Hady, W. F.

    1986-01-01

    A development history, a current development status assessment, and a design feature and performance capabilities account are given for stratified-charge rotary engines applicable to aircraft propulsion. Such engines are capable of operating on Jet-A fuel with substantial cost savings, improved altitude capability, and lower fuel consumption by comparison with gas turbine powerplants. Attention is given to the current development program of a 400-hp engine scheduled for initial operations in early 1990. Stratified charge rotary engines are also applicable to ground power units, airborne APUs, shipboard generators, and vehicular engines.

  14. 3D display considerations for rugged airborne environments

    NASA Astrophysics Data System (ADS)

    Barnidge, Tracy J.; Tchon, Joseph L.

    2015-05-01

    The KC-46 is the next generation, multi-role, aerial refueling tanker aircraft being developed by Boeing for the United States Air Force. Rockwell Collins has developed the Remote Vision System (RVS) that supports aerial refueling operations under a variety of conditions. The system utilizes large-area, high-resolution 3D displays linked with remote sensors to enhance the operator's visual acuity for precise aerial refueling control. This paper reviews the design considerations, trade-offs, and other factors related to the selection and ruggedization of the 3D display technology for this military application.

  15. The Eastern Renewable Generation Integration Study: Insights on System Stress: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bloom, Aaron; Novacheck, Josh

    The Eastern Renewable Generation Integration Study (ERGIS) explores the operational impacts of the wide spread adoption of wind and solar photovoltaics (PV) resources in North America's Eastern and Quebec Interconnections. We explore the impact of large scale adoption of wind and solar generation on the unit commitment and economic dispatch of the largest coordinated power system in the world by simulating hourly and five-minute operations. Using NREL's high-performance computing capabilities and new methodologies to model operations, we found that the modeled system, as simulated with evolutionary change in 2026, could balance the variability and uncertainty of wind and solar PVmore » at a five-minute level under a variety of conditions. Our simulations achieve instantaneous penetrations that exceed 50% of load while meeting an annual penetration of 30% on an energy basis. The system meets balanced load and supply in all intervals, with modest curtailment, using technologies and practices that are widely available today. However, a variety of the conditions present in these simulations deviate substantially from historical practice. In this work, we analyze potentially stressful system conditions that occur in the simulations and identify opportunities for innovation, regulatory reform, and changes in operating practices that require further analysis to enable the transition to a system with more wind and solar PV.« less

  16. Bench Scale Process for Low Cost CO 2 Capture Using a Phase-Changing Absorbent: Final Scientific/Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Westendorf, Tiffany; Buddle, Stanlee; Caraher, Joel

    The objective of this project is to design and build a bench-scale process for a novel phase-changing aminosilicone-based CO 2-capture solvent. The project will establish scalability and technical and economic feasibility of using a phase-changing CO 2-capture absorbent for post-combustion capture of CO 2 from coal-fired power plants. The U.S. Department of Energy’s goal for Transformational Carbon Capture Technologies is the development of technologies available for demonstration by 2025 that can capture 90% of emitted CO 2 with at least 95% CO 2 purity for less than $40/tonne of CO 2 captured. In the first budget period of the project,more » the bench-scale phase-changing CO2 capture process was designed using data and operating experience generated under a previous project (ARPA-e project DE-AR0000084). Sizing and specification of all major unit operations was completed, including detailed process and instrumentation diagrams. The system was designed to operate over a wide range of operating conditions to allow for exploration of the effect of process variables on CO 2 capture performance. In the second budget period of the project, individual bench-scale unit operations were tested to determine the performance of each of each unit. Solids production was demonstrated in dry simulated flue gas across a wide range of absorber operating conditions, with single stage CO 2 conversion rates up to 75mol%. Desorber operation was demonstrated in batch mode, resulting in desorption performance consistent with the equilibrium isotherms for GAP-0/CO 2 reaction. Important risks associated with gas humidity impact on solids consistency and desorber temperature impact on thermal degradation were explored, and adjustments to the bench-scale process were made to address those effects. Corrosion experiments were conducted to support selection of suitable materials of construction for the major unit operations in the process. The bench scale unit operations were assembled into a continuous system to support steady state system testing. In the third budget period of the project, continuous system testing was conducted, including closed-loop operation of the absorber and desober systems. Slurries of GAP-0/GAP-0 carbamate/water mixtures produced in the absorber were pumped successfully to the desorber unit, and regenerated solvent was returned to the absorber. A techno-economic analysis, EH&S risk assessment, and solvent manufacturability study were completed.« less

  17. Eastern Renewable Generation Integration Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bloom, Aaron; Townsend, Aaron; Palchak, David

    2016-08-01

    The Eastern Interconnection (EI) is one of the largest power systems in the world, and its size and complexity have historically made it difficult to study in high levels of detail in a modeling environment. In order to understand how this system might be impacted by high penetrations (30% of total annual generation) of wind and solar photovoltaic (PV) during steady state operations, the National Renewable Energy Laboratory (NREL) and the U.S. Department of Energy (DOE) conducted the Eastern Renewable Generation Integration Study (ERGIS). This study investigates certain aspects of the reliability and economic efficiency problem faced by power systemmore » operators and planners. Specifically, the study models the ability to meet electricity demand at a 5-minute time interval by scheduling resources for known ramping events, while maintaining adequate reserves to meet random variation in supply and demand, and contingency events. To measure the ability to meet these requirements, a unit commitment and economic dispatch (UC&ED) model is employed to simulate power system operations. The economic costs of managing this system are presented using production costs, a traditional UC&ED metric that does not include any consideration of long-term fixed costs. ERGIS simulated one year of power system operations to understand regional and sub-hourly impacts of wind and PV by developing a comprehensive UC&ED model of the EI. In the analysis, it is shown that, under the study assumptions, generation from approximately 400 GW of combined wind and PV capacity can be balanced on the transmission system at a 5-minute level. In order to address the significant computational burdens associated with a model of this detail we apply novel computing techniques to dramatically reduce simulation solve time while simultaneously increasing the resolution and fidelity of the analysis. Our results also indicate that high penetrations of wind and PV (collectively variable generation (VG)), significantly impact the operation of traditional generating resources and cause these resources to be used less frequently and operate across a broader output range because wind and PV have lower operating costs and variable output levels.« less

  18. Effect of Operating and Sampling Conditions on the Exhaust Gas Composition of Small-Scale Power Generators

    PubMed Central

    Smits, Marianne; Vanpachtenbeke, Floris; Horemans, Benjamin; De Wael, Karolien; Hauchecorne, Birger; Van Langenhove, Herman; Demeestere, Kristof; Lenaerts, Silvia

    2012-01-01

    Small stationary diesel engines, like in generator sets, have limited emission control measures and are therefore responsible for 44% of the particulate matter (PM) emissions in the United States. The diesel exhaust composition depends on operating conditions of the combustion engine. Furthermore, the measurements are influenced by the used sampling method. This study examines the effect of engine loading and exhaust gas dilution on the composition of small-scale power generators. These generators are used in different operating conditions than road-transport vehicles, resulting in different emission characteristics. Experimental data were obtained for gaseous volatile organic compounds (VOC) and PM mass concentration, elemental composition and nitrate content. The exhaust composition depends on load condition because of its effect on fuel consumption, engine wear and combustion temperature. Higher load conditions result in lower PM concentration and sharper edged particles with larger aerodynamic diameters. A positive correlation with load condition was found for K, Ca, Sr, Mn, Cu, Zn and Pb adsorbed on PM, elements that originate from lubricating oil or engine corrosion. The nitrate concentration decreases at higher load conditions, due to enhanced nitrate dissociation to gaseous NO at higher engine temperatures. Dilution on the other hand decreases PM and nitrate concentration and increases gaseous VOC and adsorbed metal content. In conclusion, these data show that operating and sampling conditions have a major effect on the exhaust gas composition of small-scale diesel generators. Therefore, care must be taken when designing new experiments or comparing literature results. PMID:22442670

  19. PC-based control unit for a head-mounted operating microscope for augmented-reality visualization in surgical navigation

    NASA Astrophysics Data System (ADS)

    Figl, Michael; Birkfellner, Wolfgang; Watzinger, Franz; Wanschitz, Felix; Hummel, Johann; Hanel, Rudolf A.; Ewers, Rolf; Bergmann, Helmar

    2002-05-01

    Two main concepts of Head Mounted Displays (HMD) for augmented reality (AR) visualization exist, the optical and video-see through type. Several research groups have pursued both approaches for utilizing HMDs for computer aided surgery. While the hardware requirements for a video see through HMD to achieve acceptable time delay and frame rate seem to be enormous the clinical acceptance of such a device is doubtful from a practical point of view. Starting from previous work in displaying additional computer-generated graphics in operating microscopes, we have adapted a miniature head mounted operating microscope for AR by integrating two very small computer displays. To calibrate the projection parameters of this so called Varioscope AR we have used Tsai's Algorithm for camera calibration. Connection to a surgical navigation system was performed by defining an open interface to the control unit of the Varioscope AR. The control unit consists of a standard PC with a dual head graphics adapter to render and display the desired augmentation of the scene. We connected this control unit to a computer aided surgery (CAS) system by the TCP/IP interface. In this paper we present the control unit for the HMD and its software design. We tested two different optical tracking systems, the Flashpoint (Image Guided Technologies, Boulder, CO), which provided about 10 frames per second, and the Polaris (Northern Digital, Ontario, Canada) which provided at least 30 frames per second, both with a time delay of one frame.

  20. Electricity market design for generator revenue sufficiency with increased variable generation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Levin, Todd; Botterud, Audun

    Here, we present a computationally efficient mixed-integer program (MIP) that determines optimal generator expansion decisions, and hourly unit commitment and dispatch in a power system. The impact of increasing wind power capacity on the optimal generation mix and generator profitability is analyzed for a test case that approximates the electricity market in Texas (ERCOT). We analyze three market policies that may support resource adequacy: Operating Reserve Demand Curves (ORDC), Fixed Reserve Scarcity Prices (FRSP) and fixed capacity payments (CP). Optimal expansion plans are comparable between the ORDC and FRSP implementations, while capacity payments may result in additional new capacity. Themore » FRSP policy leads to frequent reserves scarcity events and corresponding price spikes, while the ORDC implementation results in more continuous energy prices. Average energy prices decrease with increasing wind penetration under all policies, as do revenues for baseload and wind generators. Intermediate and peak load plants benefit from higher reserve prices and are less exposed to reduced energy prices. All else equal, an ORDC approach may be preferred to FRSP as it results in similar expansion and revenues with less extreme energy prices. A fixed CP leads to additional new flexible NGCT units, but lower profits for other technologies.« less

  1. Electricity market design for generator revenue sufficiency with increased variable generation

    DOE PAGES

    Levin, Todd; Botterud, Audun

    2015-10-01

    Here, we present a computationally efficient mixed-integer program (MIP) that determines optimal generator expansion decisions, and hourly unit commitment and dispatch in a power system. The impact of increasing wind power capacity on the optimal generation mix and generator profitability is analyzed for a test case that approximates the electricity market in Texas (ERCOT). We analyze three market policies that may support resource adequacy: Operating Reserve Demand Curves (ORDC), Fixed Reserve Scarcity Prices (FRSP) and fixed capacity payments (CP). Optimal expansion plans are comparable between the ORDC and FRSP implementations, while capacity payments may result in additional new capacity. Themore » FRSP policy leads to frequent reserves scarcity events and corresponding price spikes, while the ORDC implementation results in more continuous energy prices. Average energy prices decrease with increasing wind penetration under all policies, as do revenues for baseload and wind generators. Intermediate and peak load plants benefit from higher reserve prices and are less exposed to reduced energy prices. All else equal, an ORDC approach may be preferred to FRSP as it results in similar expansion and revenues with less extreme energy prices. A fixed CP leads to additional new flexible NGCT units, but lower profits for other technologies.« less

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cheng, Jing-Jy; Flood, Paul E.; LePoire, David

    In this report, the results generated by RESRAD-RDD version 2.01 are compared with those produced by RESRAD-RDD version 1.7 for different scenarios with different sets of input parameters. RESRAD-RDD version 1.7 is spreadsheet-driven, performing calculations with Microsoft Excel spreadsheets. RESRAD-RDD version 2.01 revamped version 1.7 by using command-driven programs designed with Visual Basic.NET to direct calculations with data saved in Microsoft Access database, and re-facing the graphical user interface (GUI) to provide more flexibility and choices in guideline derivation. Because version 1.7 and version 2.01 perform the same calculations, the comparison of their results serves as verification of both versions.more » The verification covered calculation results for 11 radionuclides included in both versions: Am-241, Cf-252, Cm-244, Co-60, Cs-137, Ir-192, Po-210, Pu-238, Pu-239, Ra-226, and Sr-90. At first, all nuclidespecific data used in both versions were compared to ensure that they are identical. Then generic operational guidelines and measurement-based radiation doses or stay times associated with a specific operational guideline group were calculated with both versions using different sets of input parameters, and the results obtained with the same set of input parameters were compared. A total of 12 sets of input parameters were used for the verification, and the comparison was performed for each operational guideline group, from A to G, sequentially. The verification shows that RESRAD-RDD version 1.7 and RESRAD-RDD version 2.01 generate almost identical results; the slight differences could be attributed to differences in numerical precision with Microsoft Excel and Visual Basic.NET. RESRAD-RDD version 2.01 allows the selection of different units for use in reporting calculation results. The results of SI units were obtained and compared with the base results (in traditional units) used for comparison with version 1.7. The comparison shows that RESRAD-RDD version 2.01 correctly reports calculation results in the unit specified in the GUI.« less

  3. 3rd-generation MW/LWIR sensor engine for advanced tactical systems

    NASA Astrophysics Data System (ADS)

    King, Donald F.; Graham, Jason S.; Kennedy, Adam M.; Mullins, Richard N.; McQuitty, Jeffrey C.; Radford, William A.; Kostrzewa, Thomas J.; Patten, Elizabeth A.; McEwan, Thomas F.; Vodicka, James G.; Wootan, John J.

    2008-04-01

    Raytheon has developed a 3rd-Generation FLIR Sensor Engine (3GFSE) for advanced U.S. Army systems. The sensor engine is based around a compact, productized detector-dewar assembly incorporating a 640 x 480 staring dual-band (MW/LWIR) focal plane array (FPA) and a dual-aperture coldshield mechanism. The capability to switch the coldshield aperture and operate at either of two widely-varying f/#s will enable future multi-mode tactical systems to more fully exploit the many operational advantages offered by dual-band FPAs. RVS has previously demonstrated high-performance dual-band MW/LWIR FPAs in 640 x 480 and 1280 x 720 formats with 20 μm pitch. The 3GFSE includes compact electronics that operate the dual-band FPA and variable-aperture mechanism, and perform 14-bit analog-to-digital conversion of the FPA output video. Digital signal processing electronics perform "fixed" two-point non-uniformity correction (NUC) of the video from both bands and optional dynamic scene-based NUC; advanced enhancement processing of the output video is also supported. The dewar-electronics assembly measures approximately 4.75 x 2.25 x 1.75 inches. A compact, high-performance linear cooler and cooler electronics module provide the necessary FPA cooling over a military environmental temperature range. 3GFSE units are currently being assembled and integrated at RVS, with the first units planned for delivery to the US Army.

  4. Transient Pressure Measurements in the Vaneless Space of a Francis Turbine during Load Acceptances from Minimum Load

    NASA Astrophysics Data System (ADS)

    Goyal, R.; Gandhi, B. K.; Cervantes, M. J.

    2018-06-01

    Increased penetration of solar and the wind impels the designers of the hydroelectric power generation unit to provide more flexibility in operation for the stability of the grid. The power generating unit includes turbine which needs to sustain sudden change in its operating conditions. Thus, the hydraulic turbine experiences more transients per day which result in chronic problems such as fatigue to the runner, instrument malfunctioning, vibrations, wear and tear etc. This paper describes experiments performed on a high model (1.5:1) Francis turbine for load acceptances from the minimum load. The experiments presented in the paper are the part of Francis-99 workshop which aims to determine the performance of numerical models in simulations of model Francis turbine under steady and transient operating conditions. The aim of the paper is to present the transient pressure variation in the vaneless space of a Francis turbine where high-frequency pulsations are normally expected. For this, two pressure sensors, VL1 and VL2, are mounted at the vaneless space, one near the beginning of the spiral casing and the other before the end of the spiral casing. Both are used to capture the unsteady pressure field developed in the space between guide vanes and runner inlet. The time-resolved pressure signals are analyzed and presented during the transient to observe the pressure variation and dominant frequencies of pulsations.

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Management

    The proposed Mixed Waste Storage Unit (MWSU) will be located within the Area 5 Radioactive Waste Management Complex (RWMC). Existing facilities at the RWMC will be used to store low-level mixed waste (LLMW). Storage is required to accommodate offsite-generated LLMW shipped to the Nevada Test Site (NTS) for disposal in the new Mixed Waste Disposal Unit (MWDU) currently in the design/build stage. LLMW generated at the NTS (onsite) is currently stored on the Transuranic (TRU) Pad (TP) in Area 5 under a Mutual Consent Agreement (MCA) with the Nevada Division of Environmental Protection, Bureau of Federal Facilities (NDEP/BFF). When themore » proposed MWSU is permitted, the U.S. Department of Energy (DOE) will ask that NDEP revoke the MCA and onsite-generated LLMW will fall under the MWSU permit terms and conditions. The unit will also store polychlorinated biphenyl (PCB) waste and friable and non-friable asbestos waste that meets the acceptance criteria in the Waste Analysis Plan (Exhibit 2) for disposal in the MWDU. In addition to Resource Conservation and Recovery Act (RCRA) requirements, the proposed MWSU will also be subject to Department of Energy (DOE) orders and other applicable state and federal regulations. Table 1 provides the metric conversion factors used in this application. Table 2 provides a list of existing permits. Table 3 lists operational RCRA units at the NTS and their respective regulatory status.« less

  6. Biophysically Based Mathematical Modeling of Interstitial Cells of Cajal Slow Wave Activity Generated from a Discrete Unitary Potential Basis

    PubMed Central

    Faville, R.A.; Pullan, A.J.; Sanders, K.M.; Koh, S.D.; Lloyd, C.M.; Smith, N.P.

    2009-01-01

    Abstract Spontaneously rhythmic pacemaker activity produced by interstitial cells of Cajal (ICC) is the result of the entrainment of unitary potential depolarizations generated at intracellular sites termed pacemaker units. In this study, we present a mathematical modeling framework that quantitatively represents the transmembrane ion flows and intracellular Ca2+ dynamics from a single ICC operating over the physiological membrane potential range. The mathematical model presented here extends our recently developed biophysically based pacemaker unit modeling framework by including mechanisms necessary for coordinating unitary potential events, such as a T-Type Ca2+ current, Vm-dependent K+ currents, and global Ca2+ diffusion. Model simulations produce spontaneously rhythmic slow wave depolarizations with an amplitude of 65 mV at a frequency of 17.4 cpm. Our model predicts that activity at the spatial scale of the pacemaker unit is fundamental for ICC slow wave generation, and Ca2+ influx from activation of the T-Type Ca2+ current is required for unitary potential entrainment. These results suggest that intracellular Ca2+ levels, particularly in the region local to the mitochondria and endoplasmic reticulum, significantly influence pacing frequency and synchronization of pacemaker unit discharge. Moreover, numerical investigations show that our ICC model is capable of qualitatively replicating a wide range of experimental observations. PMID:19527643

  7. Analysis of the Effects of a Flexible Ramping Ancillary Service Product on Power System Operations: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krad, Ibrahim; Ibanez, Eduardo; Ela, Erik

    2015-10-19

    The recent increased interest in utilizing variable generation (VG) resources such as wind and solar in power systems has motivated investigations into new operating procedures. Although these resources provide desirable value to a system (e.g., no fuel costs or emissions), interconnecting them provides unique challenges. Their variable, non-controllable nature in particular requires significant attention, because it directly results in increased power system variability and uncertainty. One way to handle this is via new operating reserve schemes. Operating reserves provide upward and downward generation and ramping capacity to counteract uncertainty and variability prior to their realization. For instance, uncertainty and variabilitymore » in real-time dispatch can be accounted for in the hour-ahead unit commitment. New operating reserve methodologies that specifically account for the increased variability and uncertainty caused by VG are currently being investigated and developed by academia and industry. This paper examines one method inspired by the new operating reserve product being proposed by the California Independent System Operator. The method is based on examining the potential ramping requirements at any given time and enforcing those requirements via a reserve demand curve in the market-clearing optimization as an additional ancillary service product.« less

  8. Advanced Stirling Convertor Control Unit Testing at NASA Glenn Research Center in the Radioisotope Power Systems System Integration Laboratory

    NASA Technical Reports Server (NTRS)

    Dugala, Gina M.; Taylor, Linda M.; Kussmaul, Michael; Casciani, Michael; Brown, Gregory; Wiser, Joel

    2017-01-01

    Future NASA missions could include establishing Lunar or Martian base camps, exploring Jupiters moons and travelling beyond where generating power from sunlight may be limited. Radioisotope Power Systems (RPS) provide a dependable power source for missions where inadequate sunlight or operational requirements make other power systems impractical. Over the past decade, NASA Glenn Research Center (GRC) has been supporting the development of RPSs. The Advanced Stirling Radioisotope Generator (ASRG) utilized a pair of Advanced Stirling Convertors (ASC). While flight development of the ASRG has been cancelled, much of the technology and hardware continued development and testing to guide future activities. Specifically, a controller for the convertor(s) is an integral part of a Stirling-based RPS. For the ASRG design, the controller maintains stable operation of the convertors, regulates the alternating current produced by the linear alternator of the convertor, provides a specified direct current output voltage for the spacecraft, synchronizes the piston motion of the two convertors in order to minimize vibration as well as manage and maintain operation with a stable piston amplitude and hot end temperature. It not only provides power to the spacecraft but also must regulate convertor operation to avoid damage to internal components and maintain safe thermal conditions after fueling. Lockheed Martin Coherent Technologies has designed, developed and tested an Engineering Development Unit (EDU) Advanced Stirling Convertor Control Unit (ACU) to support this effort. GRC used the ACU EDU as part of its non-nuclear representation of a RPS which also consists of a pair of Dual Advanced Stirling Convertor Simulator (DASCS), and associated support equipment to perform a test in the Radioisotope Power Systems System Integration Laboratory (RSIL). The RSIL was designed and built to evaluate hardware utilizing RPS technology. The RSIL provides insight into the electrical interactions between as many as 3 radioisotope power generators, associated control strategies, and typical electric system loads. The first phase of testing included a DASCS which was developed by Johns Hopkins UniversityApplied Physics Laboratory and simulates the operation and electrical behavior of a pair of ASCs in real time via a combination of hardware and software. Testing included the following spacecraft electrical energy storage configurations: capacitive, battery, and supercapacitor. Testing of the DASCS and ACU in each energy storage configuration included simulation of a typical mission profile, and transient voltage and current data during load turn-on/turn-off. Testing for these devices also included the initiation of several system faults such as short circuits, electrical bus over-voltage, under-voltage and a dead bus recovery to restore normal power operations. The goal of this testing was to verify operation of the ACU(s) when connected to a spacecraft electrical bus.

  9. Three essays on U.S. electricity restructuring

    NASA Astrophysics Data System (ADS)

    Sergici, Sanem I.

    2008-04-01

    The traditional structure of the electricity sector in the U.S. has been that of large vertically integrated companies with sole responsibility for distributing power to end users within a franchise area. The restructuring of this sector that has occurred in the past 10-20 years has profoundly altered this picture. This dissertation examines three aspects of that restructuring process. First chapter of my dissertation investigates the impacts of divestitures of generation, an important part of the process of restructuring, on the efficiency of distribution systems. We find that while all divestitures as a group do not significantly affect distribution efficiency, those mandated by state public utility commissions have resulted in large and statistically significant adverse effects on distribution efficiency. Second chapter of my dissertation explores whether independent system operator (ISO) formation in New York has led to operating efficiencies at the unit and the system level. ISOs oversee the centralized management of the grid and the energy market and are expected to promote more efficient power generation. We test these efficiencies focusing on the generation units in New York ISO region from 1998 to 2004 and find that the NYISO formation has introduced limited efficiencies at the unit and the system level. Restructuring in the electricity industry has spawned a new wave of mergers, both raising questions and providing opportunities to examine these mergers. Third chapter of my dissertation investigates the drivers of electric utility mergers consummated between 1992 and 2004. My results provide support for disturbance theory of mergers, size hypothesis, and inefficient management hypothesis as drivers of electric utility mergers. I also find that the adjacency of the service territories is the most noteworthy determinant of the pairings between IOUs.

  10. Data feature: 1996 world nuclear electricity production

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-12-01

    Detailed data on electricity supplied by nuclear power reactors in 1996 are provided. Figures from the International Atomic Energy Agency indicate that a total of 32 countries worldwide were operating 441 nuclear power plants with an installed capacity of 350,411 GWe, and that 36 commercial nuclear power plant units in 14 different countries with an aggregate installed capacity of 27,928 GWe were under construction. Worldwide nuclear generated electricity increased by 3.6% from 1995 to 1996, providing 17.3% of the world`s electricity production. Data for individual countries and regional totals, including generation and consumption data by source, are provided for Westernmore » Europe, Eastern Europe, the Commonwealth of Independent States, the Far East, Canada, and the United States. Other information provided includes 1996 commercial startups, decommissioning, reactor load factors, imports and exports, and gross electricity production.« less

  11. Features of steam turbine cooling by the example of an SKR-100 turbine for supercritical steam parameters

    NASA Astrophysics Data System (ADS)

    Arkadyev, B. A.

    2015-10-01

    Basic principles of cooling of high-temperature steam turbines and constructive solutions used for development of the world's first cooled steam turbine SKR-100 (R-100-300) are described. Principal differences between the thermodynamic properties of cooling medium in the steam and gas turbines and the preference of making flow passes of cooled cylinders of steam turbines as reactive are shown. Some of its operation results and their conclusions are given. This turbine with a power of 100 MW, initial steam parameters approximately 30 MPa and 650°C, and back pressure 3 MPa was made by a Kharkov turbine plant in 1961 and ran successfully at a Kashira GRES (state district power plant) up to 1979, when it was taken out of use in a still fully operating condition. For comparison, some data on construction features and operation results of the super-high pressure cylinder of steam turbines of American Philo 6 (made by General Electric Co.) and Eddystone 1 (made by Westinghouse Co.) power generating units, which are close to the SKR-100 turbine by design initial steam parameters and the implementation time, are given. The high operational reliability and effectiveness of the cooling system that was used in the super-high pressure cylinder of the SKR-100 turbine of the power-generating unit, which were demonstrated in operation, confirms rightfulness and expediency of principles and constructive solutions laid at its development. As process steam temperatures are increased, the realization of the proposed approach to cooling of multistage turbines makes it possible to limit for large turbine parts the application of new, more expensive high-temperature materials, which are required for making steam boilers, and, in some cases, to do completely away with their utilization.

  12. Sensitivity of the Community Multiscale Air Quality (CMAQ) Model v4.7 Results for the Eastern United States to MM5 and WRF Meteorological Drivers

    EPA Science Inventory

    This paper presents a comparison of the operational performance of two Community Multiscale Air Quality (CMAQ) model v4.7 simulations that utilize input data from the 5th generation Mesoscale Model MM5 and the Weather Research and Forecasting (WRF) meteorological models.

  13. PREDICTING RELATIVE RISK OF INVASION BY SALTCEDAR AND MUD SNAILS IN RIVER NETWORKS UNDER DIFFERENT SCENARIOS OF CLIMATE CHANGE AND DAM OPERATIONS IN THE WESTERN UNITED STATES

    EPA Science Inventory

    This synthetic, multi-scale approach will generate a sequence of spatially explicit maps that will provide science guidance to support strategic decision-making regarding the spatially-distributed risk of, and possible adaptation to, the spread of invasive species at local to ...

  14. 76 FR 5216 - Florida Power Corporation, Crystal River Unit 3 Nuclear Generating Plant; Exemption

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-28

    ... for Crystal River from 24 to 26 months on a one-time only basis. The proposed exemption does not make... licensed operator requalification program period for Crystal River from 24 to 26 months on a one-time only....59, by allowing Crystal River a one-time extension in the allowed time for completing the current...

  15. GOES-R ITAR Photos for Media Day

    NASA Image and Video Library

    2016-09-26

    The Geostationary Operational Environmental Satellite (GOES-R) is undergoing final launch preparations prior to fueling inside the Astrotech payload processing facility in Titusville, Florida near NASA’s Kennedy Space Center. GOES-R will be the first satellite in a series of next-generation NOAA GOES Satellites. The spacecraft is to launch aboard a United Launch Alliance Atlas V rocket in November.

  16. GOES-R Uncrating and Move to Vertical

    NASA Image and Video Library

    2016-08-23

    The GOES-R spacecraft is inspected after being uncrated and raised to vertical inside the Astrotech payload processing facility in Titusville, Florida near NASA’s Kennedy Space Center. GOES-R will be the first satellite in a series of next-generation NOAA Geostationary Operational Environmental Satellites. The spacecraft is to launch aboard a United Launch Alliance Atlas V rocket in November.

  17. GOES-R Rotation to Vertical

    NASA Image and Video Library

    2016-09-15

    The Geostationary Operational Environmental Satellite (GOES-R) is lifted to the vertical position on an “up-ender” inside the Astrotech payload processing facility in Titusville, Florida near NASA’s Kennedy Space Center. GOES-R will be the first satellite in a series of next-generation NOAA GOES Satellites. The spacecraft is to launch aboard a United Launch Alliance Atlas V rocket in November.

  18. GOES-R Encapsulation

    NASA Image and Video Library

    2016-10-21

    Team members with United Launch Alliance (ULA) prepare the Geostationary Operational Environmental Satellite (GOES-R) for encapsulation in the payload fairing inside the Astrotech payload processing facility in Titusville, Florida near NASA’s Kennedy Space Center. GOES-R will be the first satellite in a series of next-generation NOAA GOES Satellites. The spacecraft is to launch aboard a ULA Atlas V rocket in November.

  19. GOES-R Uncrating and Move to Vertical

    NASA Image and Video Library

    2016-08-23

    Team members monitor progress as the GOES-R spacecraft is lifted from horizontal to vertical inside the Astrotech payload processing facility in Titusville, Florida near NASA’s Kennedy Space Center. GOES-R will be the first satellite in a series of next-generation NOAA Geostationary Operational Environmental Satellites. The spacecraft is to launch aboard a United Launch Alliance Atlas V rocket in November.

  20. GOES-R Uncrating and Move to Vertical

    NASA Image and Video Library

    2016-08-23

    Team members monitor progress as the GOES-R spacecraft is raised to vertical inside the Astrotech payload processing facility in Titusville, Florida near NASA’s Kennedy Space Center. GOES-R will be the first satellite in a series of next-generation NOAA Geostationary Operational Environmental Satellites. The spacecraft is to launch aboard a United Launch Alliance Atlas V rocket in November.

Top