Sample records for generator startup process

  1. The Phenomenon of Business Start-Ups.

    ERIC Educational Resources Information Center

    Melis, Africa

    1990-01-01

    A study of four European countries (France, United Kingdom, Italy, and Spain) was conducted to gather data on the business start-up process and its impact on the generation of jobs, small business start-up support programs, training and counseling programs, and characteristics of successful business starters. (The original aim of the study was to…

  2. Electrical start-up for diesel fuel processing in a fuel-cell-based auxiliary power unit

    NASA Astrophysics Data System (ADS)

    Samsun, Remzi Can; Krupp, Carsten; Tschauder, Andreas; Peters, Ralf; Stolten, Detlef

    2016-01-01

    As auxiliary power units in trucks and aircraft, fuel cell systems with a diesel and kerosene reforming capacity offer the dual benefit of reduced emissions and fuel consumption. In order to be commercially viable, these systems require a quick start-up time with low energy input. In pursuit of this end, this paper reports an electrical start-up strategy for diesel fuel processing. A transient computational fluid dynamics model is developed to optimize the start-up procedure of the fuel processor in the 28 kWth power class. The temperature trend observed in the experiments is reproducible to a high degree of accuracy using a dual-cell approach in ANSYS Fluent. Starting from a basic strategy, different options are considered for accelerating system start-up. The start-up time is reduced from 22 min in the basic case to 9.5 min, at an energy consumption of 0.4 kW h. Furthermore, an electrical wire is installed in the reformer to test the steam generation during start-up. The experimental results reveal that the generation of steam at 450 °C is possible within seconds after water addition to the reformer. As a result, the fuel processor can be started in autothermal reformer mode using the electrical concept developed in this work.

  3. Start-up control system and vessel for LMFBR

    DOEpatents

    Durrant, Oliver W.; Kakarala, Chandrasekhara R.; Mandel, Sheldon W.

    1987-01-01

    A reflux condensing start-up system includes a steam generator, a start-up vessel connected parallel to the steam generator, a main steam line connecting steam outlets of the steam generator and start-up vessel to a steam turbine, a condenser connected to an outlet of the turbine and a feedwater return line connected between the condenser and inlets of the steam generator and start-up vessel. The start-up vessel has one or more heaters at the bottom thereof for heating feedwater which is supplied over a start-up line to the start-up vessel. Steam is thus generated to pressurize the steam generator before the steam generator is supplied with a heat transfer medium, for example liquid sodium, in the case of a liquid metal fast breeder reactor. The start-up vessel includes upper and lower bulbs with a smaller diameter mid-section to act as water and steam reservoirs. The start-up vessel can thus be used not only in a start-up operation but as a mixing tank, a water storage tank and a level control at low loads for controlling feedwater flow.

  4. Start-up control system and vessel for LMFBR

    DOEpatents

    Durrant, Oliver W.; Kakarala, Chandrasekhara R.; Mandel, Sheldon W.

    1987-01-01

    A reflux condensing start-up system comprises a steam generator, a start-up vessel connected parallel to the steam generator, a main steam line connecting steam outlets of the steam generator and start-up vessel to a steam turbine, a condenser connected to an outlet of the turbine and a feedwater return line connected between the condenser and inlets of the steam generator and start-up vessel. The start-up vessel has one or more heaters at the bottom thereof for heating feedwater which is supplied over a start-up line to the start-up vessel. Steam is thus generated to pressurize the steam generator before the steam generator is supplied with a heat transfer medium, for example liquid sodium, in the case of a liquid metal fast breeder reactor. The start-up vessel includes upper and lower bulbs with a smaller diameter mid-section to act as water and steam reservoirs. The start-up vessel can thus be used not only in a start-up operation but as a mixing tank, a water storage tank and a level control at low loads for controlling feedwater flow.

  5. Characteristics of dioxin emissions at startup and shutdown of MSW incinerators.

    PubMed

    Tejima, Hajime; Nishigaki, Masahide; Fujita, Yasuyuki; Matsumoto, Akihiro; Takeda, Nobuo; Takaoka, Masaki

    2007-01-01

    Dioxin concentrations from municipal waste incinerators in Japan and elsewhere often show low concentrations that comply with legal limits (in this paper, the term "dioxin" designates WHO-TEQ: PCDD/Fs+dioxin-like PCB). However, such data is usually generated under normal steady state operational conditions, and there has been little investigation of releases occurring during startup and shutdown. It is important, therefore, to ascertain quantitatively emissions in an unsteady state (startup and shutdown) in order to correctly evaluate the relationship between emissions from a facility and the surrounding environment. The present study aimed to examine dioxin emissions of a continuously operated incinerator at startup and shutdown, and estimating the time period of greatest emission, and the processes causing dioxin generation. The startup process was divided into five stages and the shutdown into two; at each stage, dioxins in the flue gas were measured at the boiler outlet and the stack. From the concentration of dioxins and the flue gas volume at each stage, the amount of dioxins at startup and shutdown were calculated, and these were compared with that under steady state conditions. Dioxin concentration at the stack under steady state conditions was a very low level, while those at startup and shutdown were higher. In the case where dioxin concentration under a steady state is a low level like in this study, it is indicated that the total annual dioxin emission from a facility could be attributed to the startup periods.

  6. [From idea to standard care-a field report].

    PubMed

    Herberz, Chantal; Steidl, Ralph; Werner, Pascal; Hagen, Julia

    2018-03-01

    Digital health products and services have started to fundamentally change healthcare and prevention. Products intended for a medical use require CE-marking and potentially certification (ISO 13485) of the company. Startups play an important role in the development of new digital products and services. Two startups share their experience with these processes. Becoming a part of standard care and hence being reimbursed is a challenge for startups. For this reason, startups pursue alternative sources of income, too. The statutory health insurance's procedures for assessing new products and services are perceived as long. Startups are required to provide evidence of the benefit of their product at an early stage in the procedure. This requires time-consuming and costly studies. Startups would therefore appreciate support in generating this evidence, e. g. through adequate procedures for testing.

  7. Lessons learned: design, start-up, and operation of cryogenic systems

    NASA Astrophysics Data System (ADS)

    Bell, W. M.; Bagley, R. E.; Motew, S.; Young, P.-W.

    2014-11-01

    Cryogenic systems involving a pumped cryogenic fluid, such as liquid nitrogen (LN2), require careful design since the cryogen is close to its boiling point and cold. At 1 atmosphere, LN2 boils at 77.4 K (-320.4 F). These systems, typically, are designed to transport the cryogen, use it for process heat removal, or for generation of gas (GN2) for process use. As the design progresses, it is important to consider all aspects of the design including, cryogen storage, pressure control and safety relief systems, thermodynamic conditions, equipment and instrument selection, materials, insulation, cooldown, pump start-up, maximum design and minimum flow rates, two phase flow conditions, heat flow, process control to meet and maintain operating conditions, piping integrity, piping loads on served equipment, warm-up, venting, and shut-down. "Cutting corners" in the design process can result in stalled start-ups, field rework, schedule hits, or operational restrictions. Some of these "lessoned learned" are described in this paper.

  8. Innovation: Examining Workplace Learning in New Enterprises.

    ERIC Educational Resources Information Center

    Fenwick, Tara

    2003-01-01

    A study of women entrepreneurs explored learning in the process of business start-up, conditions that foster innovative learning (challenge/variety, compelling social purpose, recognition and pride), and forms of innovative learning (generating multiple ideas, scanning, optimizing, problem solving, self-confidence). Innovative processes involved…

  9. Solid oxide fuel cell power plant having a bootstrap start-up system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lines, Michael T

    The bootstrap start-up system (42) achieves an efficient start-up of the power plant (10) that minimizes formation of soot within a reformed hydrogen rich fuel. A burner (48) receives un-reformed fuel directly from the fuel supply (30) and combusts the fuel to heat cathode air which then heats an electrolyte (24) within the fuel cell (12). A dilute hydrogen forming gas (68) cycles through a sealed heat-cycling loop (66) to transfer heat and generated steam from an anode side (32) of the electrolyte (24) through fuel processing system (36) components (38, 40) and back to an anode flow field (26)more » until fuel processing system components (38, 40) achieve predetermined optimal temperatures and steam content. Then, the heat-cycling loop (66) is unsealed and the un-reformed fuel is admitted into the fuel processing system (36) and anode flow (26) field to commence ordinary operation of the power plant (10).« less

  10. 40 CFR Table 3 to Subpart Uuuuu of... - Work Practice Standards

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... startup You must operate all CMS during startup. Startup means either the first-ever firing of fuel in a... for any purpose. Startup ends when any of the steam from the boiler is used to generate electricity for sale over the grid or for any other purpose (including on site use). For startup of a unit, you...

  11. 40 CFR Table 3 to Subpart Uuuuu of... - Work Practice Standards

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... startup You must operate all CMS during startup. Startup means either the first-ever firing of fuel in a... for any purpose. Startup ends when any of the steam from the boiler is used to generate electricity for sale over the grid or for any other purpose (including on site use). For startup of a unit, you...

  12. 40 CFR Table 3 to Subpart Uuuuu of... - Work Practice Standards

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... startup You must operate all CMS during startup. Startup means either the first-ever firing of fuel in a... for any purpose. Startup ends when any of the steam from the boiler is used to generate electricity for sale over the grid or for any other purpose (including on site use). For startup of a unit, you...

  13. Physics of Tokamak Plasma Start-up

    NASA Astrophysics Data System (ADS)

    Mueller, Dennis

    2012-10-01

    This tutorial describes and reviews the state-of-art in tokamak plasma start-up and its importance to next step devices such as ITER, a Fusion Nuclear Science Facility and a Tokamak/ST demo. Tokamak plasma start-up includes breakdown of the initial gas, ramp-up of the plasma current to its final value and the control of plasma parameters during those phases. Tokamaks rely on an inductive component, typically a central solenoid, which has enabled attainment of high performance levels that has enabled the construction of the ITER device. Optimizing the inductive start-up phase continues to be an area of active research, especially in regards to achieving ITER scenarios. A new generation of superconducting tokamaks, EAST and KSTAR, experiments on DIII-D and operation with JET's ITER-like wall are contributing towards this effort. Inductive start-up relies on transformer action to generate a toroidal loop voltage and successful start-up is determined by gas breakdown, avalanche physics and plasma-wall interaction. The goal of achieving steady-sate tokamak operation has motivated interest in other methods for start-up that do not rely on the central solenoid. These include Coaxial Helicity Injection, outer poloidal field coil start-up, and point source helicity injection, which have achieved 200, 150 and 100 kA respectively of toroidal current on closed flux surfaces. Other methods including merging reconnection startup and Electron Bernstein Wave (EBW) plasma start-up are being studied on various devices. EBW start-up generates a directed electron channel due to wave particle interaction physics while the other methods mentioned rely on magnetic helicity injection and magnetic reconnection which are being modeled and understood using NIMROD code simulations.

  14. A 190 mV start-up and 59.2% efficiency CMOS gate boosting voltage doubler charge pump in 0.18 µm standard CMOS process for energy harvesting

    NASA Astrophysics Data System (ADS)

    Yoshida, Minori; Miyaji, Kousuke

    2018-04-01

    A start-up charge pump circuit for an extremely low input voltage (V IN) is proposed and demonstrated. The proposed circuit uses an inverter level shifter to generate a 2V IN voltage swing to the gate of both main NMOS and PMOS power transistors in a charge pump to reduce the channel resistance. The proposed circuit is fully implemented in a standard 0.18 µm CMOS process, and the measurement result shows that a minimum input voltage of 190 mV is achieved and output power increases by 181% compared with the conventional forward-body-bias scheme at a 300 mV input voltage. The proposed scheme achieves a maximum efficiency of 59.2% when the input voltage is 390 mV and the output current is 320 nA. The proposed circuit is suitable as a start-up circuit in ultralow power energy harvesting power management applications to boost-up from below threshold voltage.

  15. 40 CFR 63.2250 - What are the general requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., except during periods of process unit or control device startup, shutdown, and malfunction; prior to process unit initial startup; and during the routine control device maintenance exemption specified in... practice requirements are not operating, or during periods of startup, shutdown, and malfunction. Startup...

  16. 40 CFR 63.2250 - What are the general requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., except during periods of process unit or control device startup, shutdown, and malfunction; prior to process unit initial startup; and during the routine control device maintenance exemption specified in... practice requirements are not operating, or during periods of startup, shutdown, and malfunction. Startup...

  17. 40 CFR 63.2250 - What are the general requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., except during periods of process unit or control device startup, shutdown, and malfunction; prior to process unit initial startup; and during the routine control device maintenance exemption specified in... practice requirements are not operating, or during periods of startup, shutdown, and malfunction. Startup...

  18. Spatial Burnout in Water Reactors with Nonuniform Startup Distributions of Uranium and Boron

    NASA Technical Reports Server (NTRS)

    Fox, Thomas A.; Bogart, Donald

    1955-01-01

    Spatial burnout calculations have been made of two types of water moderated cylindrical reactor using boron as a burnable poison to increase reactor life. Specific reactors studied were a version of the Submarine Advanced Reactor (sAR) and a supercritical water reactor (SCW) . Burnout characteristics such as reactivity excursion, neutron-flux and heat-generation distributions, and uranium and boron distributions have been determined for core lives corresponding to a burnup of approximately 7 kilograms of fully enriched uranium. All reactivity calculations have been based on the actual nonuniform distribution of absorbers existing during intervals of core life. Spatial burnout of uranium and boron and spatial build-up of fission products and equilibrium xenon have been- considered. Calculations were performed on the NACA nuclear reactor simulator using two-group diff'usion theory. The following reactor burnout characteristics have been demonstrated: 1. A significantly lower excursion in reactivity during core life may be obtained by nonuniform rather than uniform startup distribution of uranium. Results for SCW with uranium distributed to provide constant radial heat generation and a core life corresponding to a uranium burnup of 7 kilograms indicated a maximum excursion in reactivity of 2.5 percent. This compared to a maximum excursion of 4.2 percent obtained for the same core life when w'anium was uniformly distributed at startup. Boron was incorporated uniformly in these cores at startup. 2. It is possible to approach constant radial heat generation during the life of a cylindrical core by means of startup nonuniform radial and axial distributions of uranium and boron. Results for SCW with nonuniform radial distribution of uranium to provide constant radial heat generation at startup and with boron for longevity indicate relatively small departures from the initially constant radial heat generation distribution during core life. Results for SAR with a sinusoidal distribution rather than uniform axial distributions of boron indicate significant improvements in axial heat generation distribution during the greater part of core life. 3. Uranium investments for cylindrical reactors with nonuniform radial uranium distributions which provide constant radial heat generation per unit core volume are somewhat higher than for reactors with uniform uranium concentration at startup. On the other hand, uranium investments for reactors with axial boron distributions which approach constant axial heat generation are somewhat smaller than for reactors with uniform boron distributions at startup.

  19. 40 CFR 63.2250 - What are the general requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... periods of process unit or control device startup, shutdown, and malfunction; prior to process unit initial startup; and during the routine control device maintenance exemption specified in § 63.2251. The... are not operating, or during periods of startup, shutdown, and malfunction. Startup and shutdown...

  20. 40 CFR 63.2250 - What are the general requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... periods of process unit or control device startup, shutdown, and malfunction; prior to process unit initial startup; and during the routine control device maintenance exemption specified in § 63.2251. The... are not operating, or during periods of startup, shutdown, and malfunction. Startup and shutdown...

  1. The roles of a process development group in biopharmaceutical process startup.

    PubMed

    Goochee, Charles F

    2002-01-01

    The transfer of processes for biotherapeutic products into finalmanufacturing facilities was frequently problematic during the 1980's and early 1990's, resulting in costly delays to licensure(Pisano 1997). While plant startups for this class of products can become chaotic affairs, this is not an inherent or intrinsic feature. Major classes of process startup problems have been identified andmechanisms have been developed to reduce their likelihood of occurrence. These classes of process startup problems and resolution mechanisms are the major topic of this article. With proper planning and sufficient staffing, the probably of a smooth process startup for a biopharmaceutical product can be very high - i.e., successful process performance will often beachieved within the first two full-scale process lots in the plant. The primary focus of this article is the role of the Process Development Group in helping to assure this high probability of success.

  2. Improvement of start-up and nitrogen removal of the anammox process in reactors inoculated with conventional activated sludge using biofilm carrier materials.

    PubMed

    Lu, Yi-Feng; Ma, Li-Juan; Ma, Lan; Shan, Bei; Chang, Jun-Jun

    2018-01-01

    The start-up of the anaerobic ammonium oxidation (anammox) process in three up-flow column reactors seeded with common mixed activated sludge and added with three materials, sponge (R1), sponge + volcanic rock (R2) and sponge + charcoal (R3), as carriers for biofilm formation were comparatively investigated in this study. The supplement of volcanic rock and charcoal could significantly shorten the start-up time of the anammox process, which primarily occurred in the activity-enhanced phase, with ammonium and nitrite removal efficiencies stabilized above 92.5% and 93.4% after an operation period of 145, 105 and 121 d for R1, R2 and R3, respectively. After the successful anammox start-up, R2 performed significantly better in TN removal (p < .05), achieving an average rate of 91.0% and 191.5 g N m -3  d -1 compared to R1 of 88.4% and 172.1 g N m -3  d -1 , and R3 of 89.9% and 180.1 g N m -3  d -1 in the steady running phase. The ratios of consumed [Formula: see text] and generated [Formula: see text]/consumed [Formula: see text] after anammox start-up were lower than the theoretical values, probably suggesting the simultaneous existences of anammox, denitrification as well as nitrification processes in the reactors. A reddish brown biofilm was wrapped on the carriers and morphological detection of biofilm displayed the presentations of thick and compact floc aggregates and some filamentous bacteria on the sponge, and spherical-, ovoid- and shortrod-shaped microorganisms on the volcanic rock and charcoal. Using porous material as carrier for biofilm development is an effective strategy for practical application of the anammox reactor.

  3. Start-up and Self-sustain Test of 500 W Ultra-Micro Gas Turbine Generator

    NASA Astrophysics Data System (ADS)

    Seo, Jeong Min; Park, Jun Young; Seog Choi, Bum

    2013-12-01

    This paper provides the performance test for start-up and self-sustaining of 500W ultra-micro gas turbine (UMGT) generator. Each component of UMGT, a centrifugal compressor, a radial turbine, an annular combustor and a shaft is already designed, manufactured and tested to meet design requirements in previous researches. However, they are not tested to work in an integrate system. Currently, integrated test unit with a compressor, a combustor and a turbine, is developed to find the proper condition of start-up and self-sustain. Ignition sequence depending on rotating speed is designed. Performance test for start-up and self-sustain is designed based on the ignition possible condition. An air impingement starter and a hot bulb inginer are applied. LPG is used as main fuel.

  4. Preliminary Experiment of Non-Inductive Plasma Current Startup in SUNIST Spherical Tokamak

    NASA Astrophysics Data System (ADS)

    He, Yexi; Zhang, Liang; Xie, Lifeng; Tang, Yi; Yang, Xuanzong; Feng, Chunhua; Fu, Hongjun

    2006-01-01

    The non-inductive plasma current startup is an important motivation in SUNIST spherical tokamak. In the recent experiment, the magnetron microwave system of 100 kW and 2.45 GHz has been used to the ECR plasma current startup. Besides the toroidal field, a vertical field was applied to generate preliminary toroidal plasma current without the action of the central solenoid. As the evidence of plasma current startup with the effect of vertical field drift, the direction of plasma current is changed when the direction of vertical field changes during the ECR plasma current startup discharge. We also observed a maximum plasma current by scanning vertical field in both directions. Additionally, we used electrode discharge to assist the ECR plasma current startup.

  5. Cover and startup gas supply system for solid oxide fuel cell generator

    DOEpatents

    Singh, P.; George, R.A.

    1999-07-27

    A cover and startup gas supply system for a solid oxide fuel cell power generator is disclosed. Hydrocarbon fuel, such as natural gas or diesel fuel, and oxygen-containing gas are supplied to a burner. Combustion gas exiting the burner is cooled prior to delivery to the solid oxide fuel cell. The system mixes the combusted hydrocarbon fuel constituents with hydrogen which is preferably stored in solid form to obtain a non-explosive gas mixture. The system may be used to provide both non-explosive cover gas and hydrogen-rich startup gas to the fuel cell. 4 figs.

  6. Cover and startup gas supply system for solid oxide fuel cell generator

    DOEpatents

    Singh, Prabhakar; George, Raymond A.

    1999-01-01

    A cover and startup gas supply system for a solid oxide fuel cell power generator is disclosed. Hydrocarbon fuel, such as natural gas or diesel fuel, and oxygen-containing gas are supplied to a burner. Combustion gas exiting the burner is cooled prior to delivery to the solid oxide fuel cell. The system mixes the combusted hydrocarbon fuel constituents with hydrogen which is preferably stored in solid form to obtain a non-explosive gas mixture. The system may be used to provide both non-explosive cover gas and hydrogen-rich startup gas to the fuel cell.

  7. Closed-form analytical solutions of high-temperature heat pipe startup and frozen startup limitation

    NASA Technical Reports Server (NTRS)

    Cao, Y.; Faghri, A.

    1992-01-01

    Previous numerical and experimental studies indicate that the high-temperature heat pipe startup process is characterized by a moving hot zone with relatively sharp fronts. Based on the above observation, a flat-front model for an approximate analytical solution is proposed. A closed-form solution related to the temperature distribution in the hot zone and the hot zone length as a function of time are obtained. The analytical results agree well with the corresponding experimental data, and provide a quick prediction method for the heat pipe startup performance. Finally, a heat pipe limitation related to the frozen startup process is identified, and an explicit criterion for the high-temperature heat pipe startup is derived. The frozen startup limit identified in this paper provides a fundamental guidance for high-temperature heat pipe design.

  8. Startup of Pumping Units in Process Water Supplies with Cooling Towers at Thermal and Nuclear Power Plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berlin, V. V., E-mail: vberlin@rinet.ru; Murav’ev, O. A., E-mail: muraviov1954@mail.ru; Golubev, A. V., E-mail: electronik@inbox.ru

    Aspects of the startup of pumping units in the cooling and process water supply systems for thermal and nuclear power plants with cooling towers, the startup stages, and the limits imposed on the extreme parameters during transients are discussed.

  9. Graduating into Start-up: Exploring the Transition

    ERIC Educational Resources Information Center

    Nabi, Ghulam; Holden, Rick; Walmsley, Andreas

    2009-01-01

    The main purpose of the exploratory research discussed in this paper was to generate insights into the complexity of the career-making processes involved in the transition from being a student to starting up a business. Using story-telling interviews, data were collected from fifteen graduates based in the Yorkshire region of the UK. Qualitative…

  10. 40 CFR 65.6 - Startup, shutdown, and malfunction plan and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Startup, shutdown, and malfunction... (CONTINUED) AIR PROGRAMS (CONTINUED) CONSOLIDATED FEDERAL AIR RULE General Provisions § 65.6 Startup... Group 2A or Group 2B process vents. (b) Startup, shutdown, and malfunction plan—(1) Description and...

  11. 40 CFR 65.6 - Startup, shutdown, and malfunction plan and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Startup, shutdown, and malfunction... (CONTINUED) AIR PROGRAMS (CONTINUED) CONSOLIDATED FEDERAL AIR RULE General Provisions § 65.6 Startup... Group 2A or Group 2B process vents. (b) Startup, shutdown, and malfunction plan—(1) Description and...

  12. 40 CFR 65.6 - Startup, shutdown, and malfunction plan and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Startup, shutdown, and malfunction... (CONTINUED) AIR PROGRAMS (CONTINUED) CONSOLIDATED FEDERAL AIR RULE General Provisions § 65.6 Startup... Group 2A or Group 2B process vents. (b) Startup, shutdown, and malfunction plan—(1) Description and...

  13. 40 CFR 65.6 - Startup, shutdown, and malfunction plan and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Startup, shutdown, and malfunction... (CONTINUED) AIR PROGRAMS (CONTINUED) CONSOLIDATED FEDERAL AIR RULE General Provisions § 65.6 Startup... Group 2A or Group 2B process vents. (b) Startup, shutdown, and malfunction plan—(1) Description and...

  14. 40 CFR 65.6 - Startup, shutdown, and malfunction plan and procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Startup, shutdown, and malfunction... (CONTINUED) AIR PROGRAMS (CONTINUED) CONSOLIDATED FEDERAL AIR RULE General Provisions § 65.6 Startup... Group 2A or Group 2B process vents. (b) Startup, shutdown, and malfunction plan—(1) Description and...

  15. Miniature Internal Combustion Engine-Generator for High Energy Density Portable Power

    DTIC Science & Technology

    2008-12-01

    Operation on JP-8 from cold startup to steady operation has been demonstrated at the 300 W scale. Miniature engine/generators can be acoustically silenced...design that uses a spring for energy storage . MICE is a high Q system, operating at the resonant frequency of the spring-mass system with very low...development • Demonstrated 94% efficiency of 300 W linear alternator • Demonstrated full operation of MICE generator from cold startup to net power output

  16. SuperJet International case study: a business network start-up in the aeronautics industry

    NASA Astrophysics Data System (ADS)

    Corallo, Angelo; de Maggio, Marco; Storelli, Davide

    This chapter presents the SuperJet International case study, a start-up in the aeronautics industry characterized by a process-oriented approach and a complex and as yet evolving network of partnerships and collaborations. The chapter aims to describe the key points of the start-up process, highlighting common factors and differences compared to the TEKNE Methodology of Change, with particular reference to the second and third phase, namely, the design and deployment of new techno-organizational systems. The SuperJet International startup is presented as a case study where strategic and organizational aspects have been jointly conceived from a network-driven perspective. The chapter compares some of the guidelines of the TEKNE Methodology of Change with experiences and actual practices deriving from interviews with key players in SJI's start-up process.

  17. Preheating of fluid in a supercritical Brayton cycle power generation system at cold startup

    DOEpatents

    Wright, Steven A.; Fuller, Robert L.

    2016-07-12

    Various technologies pertaining to causing fluid in a supercritical Brayton cycle power generation system to flow in a desired direction at cold startup of the system are described herein. A sensor is positioned at an inlet of a turbine, wherein the sensor is configured to output sensed temperatures of fluid at the inlet of the turbine. If the sensed temperature surpasses a predefined threshold, at least one operating parameter of the power generation system is altered.

  18. 30 CFR 250.1917 - What criteria for pre-startup review must be in my SEMS program?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 2 2011-07-01 2011-07-01 false What criteria for pre-startup review must be in... pre-startup review must be in my SEMS program? Your SEMS program must require that the commissioning process include a pre-startup safety and environmental review for new and significantly modified...

  19. Steam generator design for solar towers using solar salt as heat transfer fluid

    NASA Astrophysics Data System (ADS)

    González-Gómez, Pedro Ángel; Petrakopoulou, Fontina; Briongos, Javier Villa; Santana, Domingo

    2017-06-01

    Since the operation of a concentrating solar power plant depends on the intermittent character of solar energy, the steam generator is subject to daily start-ups, stops and load variations. Faster start-up and load changes increase the plant flexibility and the daily energy production. However, it involves high thermal stresses on thick-walled components. Continuous operational conditions may eventually lead to a material failure. For these reasons, it is important to evaluate the transient behavior of the proposed designs in order to assure the reliability. The aim of this work is to analyze different steam generator designs for solar power tower plants using molten salt as heat transfer fluid. A conceptual steam generator design is proposed and associated heat transfer areas and steam drum size are calculated. Then, dynamic models for the main parts of the steam generator are developed to represent its transient performance. A temperature change rate that ensures safe hot start-up conditions is studied for the molten salt. The thermal stress evolution on the steam drum is calculated as key component of the steam generator.

  20. Start-up of an anaerobic fluidized bed reactor treating synthetic carbohydrate rich wastewater.

    PubMed

    Yeshanew, Martha M; Frunzo, Luigi; Luongo, Vincenzo; Pirozzi, Francesco; Lens, Piet N L; Esposito, Giovanni

    2016-12-15

    The present work studied the start-up process of a mesophilic (37 ± 2 °C) anaerobic fluidized bed reactor (AFBR) operated at a hydraulic retention time (HRT) of 20 days using synthetic carbohydrate rich wastewater. Anox Kaldness-K1 carriers were used as biofilm carrier material. The reactor performance and biofilm formation were evaluated during the process. The start-up process at lower liquid recirculation flow rate enhanced the biofilm formation and reactor performance. The organic substrate composition had a major impact on early colonization of methanogenic archaea onto the surface of the Kaldness carriers during the start-up process. Specific organic substrates favouring the growth of methanogenic archaea, such as acetate, are preferred in order to facilitate the subsequent biofilm formation and AFBR start-up. The supply of 'bio-available' nutrients and trace elements, in particular iron, had an important role on optimal methanogenic activity and speeding-up of the biofilm development on the Kaldness carriers. This paper provides possible strategies to optimize the various operational parameters that influence the initial biofilm formation and development in an AFBR and similar high rate anaerobic reactors, hence can be used to reduce the long time required for process start-up. Copyright © 2016 Elsevier Ltd. All rights reserved.

  1. Avoid problems during distillation column startups

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sloley, A.W.

    1996-07-01

    The startup of a distillation column is the end product of the design process. Indeed, startup is the culmination of the theory and practice of designing the column to meet the process objectives. The author will direct most of this discussion towards column revamps due to their inherent complexity; however, the points apply equally to new columns, as well. The most important question that must be answered prior to a startup is how will the distillation system changes affect initial startup, process control of the system, and normal day-to-day operations? How will the operators run the system? Steady-state distillation-column simulationsmore » alone cannot provide an authoritative answer and, indeed, engineers` over-reliance on software too often has led them to ignore many practical aspects. Computer modeling, while an important engineering tool, is not reality. Distillation columns are real functioning pieces of equipment that require practical skills to successfully modify. They are not steady-state solutions that result from converged computer simulations. Early planning, coupled with thorough inspections and comprehensive reviews of instrumentation and procedures, can play a key role in assuring smooth startups.« less

  2. An analysis of the sliding pressure start-up of SCWR

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, F.; Yang, J.; Li, H.

    In this paper, the preliminary sliding pressure start-up system and scheme of supercritical water-cooled reactor in CGNPC (CGN-SCWR) were proposed. Thermal-hydraulic behavior in start-up procedures was analyzed in detail by employing advanced reactor subchannel analysis software ATHAS. The maximum cladding temperature (MCT for short) and core power of fuel assembly during the whole start-up process were investigated comparatively. The results show that the recommended start-up scheme meets the design requirements from the perspective of thermal-hydraulic. (authors)

  3. Impact of chemical plant start-up emissions on ambient ozone concentration

    NASA Astrophysics Data System (ADS)

    Ge, Sijie; Wang, Sujing; Xu, Qiang; Ho, Thomas

    2017-09-01

    Flare emissions, especially start-up flare emissions, during chemical plant operations generate large amounts of ozone precursors that may cause highly localized and transient ground-level ozone increment. Such an adverse ozone impact could be aggravated by the synergies of multiple plant start-ups in an industrial zone. In this paper, a systematic study on ozone increment superposition due to chemical plant start-up emissions has been performed. It employs dynamic flaring profiles of two olefin plants' start-ups to investigate the superposition of the regional 1-hr ozone increment. It also summaries the superposition trend by manipulating the starting time (00:00-10:00) of plant start-up operations and the plant distance (4-32 km). The study indicates that the ozone increment induced by simultaneous start-up emissions from multiple chemical plants generally does not follow the linear superposition of the ozone increment induced by individual plant start-ups. Meanwhile, the trend of such nonlinear superposition related to the temporal (starting time and operating hours of plant start-ups) and spatial (plant distance) factors is also disclosed. This paper couples dynamic simulations of chemical plant start-up operations with air-quality modeling and statistical methods to examine the regional ozone impact. It could be helpful for technical decision support for cost-effective air-quality and industrial flare emission controls.

  4. Testing and Optimizing a Stove-Powered Thermoelectric Generator with Fan Cooling.

    PubMed

    Zheng, Youqu; Hu, Jiangen; Li, Guoneng; Zhu, Lingyun; Guo, Wenwen

    2018-06-07

    In order to provide heat and electricity under emergency conditions in off-grid areas, a stove-powered thermoelectric generator (STEG) was designed and optimized. No battery was incorporated, ensuring it would work anytime, anywhere, as long as combustible materials were provided. The startup performance, power load feature and thermoelectric (TE) efficiency were investigated in detail. Furthermore, the heat-conducting plate thickness, cooling fan selection, heat sink dimension and TE module configuration were optimized. The heat flow method was employed to determine the TE efficiency, which was compared to the predicted data. Results showed that the STEG can supply clean-and-warm air (625 W) and electricity (8.25 W at 5 V) continuously at a temperature difference of 148 °C, and the corresponding TE efficiency was measured to be 2.31%. Optimization showed that the choice of heat-conducting plate thickness, heat sink dimensions and cooling fan were inter-dependent, and the TE module configuration affected both the startup process and the power output.

  5. Spectroscopic Measurement of Ion Flow During Merging Start-up of Field-Reversed Configuration

    NASA Astrophysics Data System (ADS)

    Oka, Hirotaka; Inomoto, Michiaki; Tanabe, Hiroshi; Annoura, Masanobu; Ono, Yasushi; Nemoto, Koshichi

    2012-10-01

    The counter-helicity merging method [1] of field-reversed configuration (FRC) formation involves generation of bidirectional toroidal flow, known as a ``sling-shot.'' In two fluids regime, reconnection process is strongly affected by the Hall effect [2]. In this study, we have investigated the behavior of toroidal bidirectional flow generated by the counter-helicity merging in two-fluids regime. We use 2D Ion Doppler Spectroscopy to mesure toroidal ion flow during merging start-up of FRC from Ar gas. We defined two cases: one case with a radially pushed-in X line (case I) and the other case with a radially pushed-out X line(case O). The flow during the plasma merging shows radial asymmetry, as expected from the magnetic measurement, but finally relaxes to a unidirectional flow in plasma current direction in both cases. We observed larger toroidal flow in the plasma current direction in case I after FRC is formed, though the FRC in case O has larger magnetic flux. These results suggest that more ions are lost during merging start-up in case I. This selective ion loss might account for stability and confinement of FRCs probably maintained by high energy ions.[4pt] [1] Y. Ono, et al., Nucl. Fusion 39, pp. 2001-2008 (1999).[0pt] [2] M. Inomoto, et al., Phys. Rev. Lett., 97, 135002, (2006)

  6. A novel transient wall heat transfer approach for the start-up of SI engines with gasoline direct injection

    NASA Astrophysics Data System (ADS)

    Lejsek, David; Kulzer, André; Hammer, Jürgen

    2010-11-01

    The introduction of CO2-reduction technologies like Start-Stop or the Hybrid-Powertrain and the worldwide stringent emission legislation require a detailed optimization of the engine start-up. The combustion concept development as well as the calibration of the engine control unit makes an explicit thermodynamic analysis of the combustion process during the start-up necessary. Initially, the well-known thermodynamic analysis of in-cylinder pressure at stationary condition was transmitted to the highly non-stationary engine start-up. For this running mode of the engine the current models for calculation of the transient wall heat fluxes were found to be misleading. With a fraction of nearly 45% of the burned fuel energy, the wall heat is very important for the calculation of energy balance and for the combustion process analysis. Based on the measurements of transient wall heat transfer densities during the start-up presented in a former work (Lejsek and Kulzer in Investigations on the transient wall heat transfer at start-up for SI engines with gasoline direct injection. SAE Paper), the paper describes the development of adaptations to the known correlations by Woschni (MTZ 31:491, 1970), Hohenberg (Experimentelle Erfassung der Wandwärme von Kolbenmotoren. TU Graz, Habil., 1980) and Bargende (Ein Gleichungsansatz zur Berechnung der instationären Wandwärmeverluste im Hochdruckteil von Ottomotoren. TH Darmstadt, PhD-Thesis, 1991) for the application during engine start-up. To demonstrate the high accuracy of the model, the results of the cyclic resolved thermodynamic analysis using the presented novel approaches were compared with the results of the measurements. It is shown, that the novel heat flux models for the engine start-up process gives a cyclic resolved thermodynamic analysis to optimize the engine start-up pretty efficient.

  7. A double-stage start-up structure to limit the inrush current used in current mode charge pump

    NASA Astrophysics Data System (ADS)

    Cong, Liu; Xinquan, Lai; Hanxiao, Du; Yuan, Chi

    2016-06-01

    A double-stage start-up structure to limit the inrush current used in current-mode charge pump with wide input range, fixed output and multimode operation is presented in this paper. As a widely utilized power source implement, a Li-battery is always used as the power supply for chips. Due to the internal resistance, a potential drop will be generated at the input terminal of the chip with an input current. A false shut down with a low supply voltage will happen if the input current is too large, leading to the degradation of the Li-battery's service life. To solve this problem, the inrush current is limited by introducing a new start-up state. All of the circuits have been implemented with the NUVOTON 0.6 μm CMOS process. The measurement results show that the inrush current can be limited below 1 A within all input supply ranges, and the power efficiency is higher than the conventional structure. Project supported by the National Natural Science Foundation of China (No. 61106026).

  8. Model for the techno-economic analysis of common work of wind power and CCGT power plant to offer constant level of power in the electricity market

    NASA Astrophysics Data System (ADS)

    Tomsic, Z.; Rajsl, I.; Filipovic, M.

    2017-11-01

    Wind power varies over time, mainly under the influence of meteorological fluctuations. The variations occur on all time scales. Understanding these variations and their predictability is of key importance for the integration and optimal utilization of wind in the power system. There are two major attributes of variable generation that notably impact the participation on power exchanges: Variability (the output of variable generation changes and resulting in fluctuations in the plant output on all time scales) and Uncertainty (the magnitude and timing of variable generation output is less predictable, wind power output has low levels of predictability). Because of these variability and uncertainty wind plants cannot participate to electricity market, especially to power exchanges. For this purpose, the paper presents techno-economic analysis of work of wind plants together with combined cycle gas turbine (CCGT) plant as support for offering continues power to electricity market. A model of wind farms and CCGT plant was developed in program PLEXOS based on real hourly input data and all characteristics of CCGT with especial analysis of techno-economic characteristics of different types of starts and stops of the plant. The Model analyzes the followings: costs of different start-stop characteristics (hot, warm, cold start-ups and shutdowns) and part load performance of CCGT. Besides the costs, the technical restrictions were considered such as start-up time depending on outage duration, minimum operation time, and minimum load or peaking capability. For calculation purposes, the following parameters are necessary to know in order to be able to economically evaluate changes in the start-up process: ramp up and down rate, time of start time reduction, fuel mass flow during start, electricity production during start, variable cost of start-up process, cost and charges for life time consumption for each start and start type, remuneration during start up time regarding expected or unexpected starts, the cost and revenues for balancing energy (important when participating in electricity market), and the cost or revenues for CO2-certificates. Main motivation for this analysis is to investigate possibilities to participate on power exchanges by offering continues guarantied power from wind plants by backing-up them with CCGT power plant.

  9. 40 CFR 68.52 - Operating procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Initial startup; (2) Normal operations; (3) Temporary operations; (4) Emergency shutdown and operations; (5) Normal shutdown; (6) Startup following a normal or emergency shutdown or a major change that... are updated, if necessary, whenever a major change occurs and prior to startup of the changed process. ...

  10. 40 CFR 68.52 - Operating procedures.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Initial startup; (2) Normal operations; (3) Temporary operations; (4) Emergency shutdown and operations; (5) Normal shutdown; (6) Startup following a normal or emergency shutdown or a major change that... are updated, if necessary, whenever a major change occurs and prior to startup of the changed process. ...

  11. 40 CFR 68.52 - Operating procedures.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Initial startup; (2) Normal operations; (3) Temporary operations; (4) Emergency shutdown and operations; (5) Normal shutdown; (6) Startup following a normal or emergency shutdown or a major change that... are updated, if necessary, whenever a major change occurs and prior to startup of the changed process. ...

  12. 40 CFR 68.52 - Operating procedures.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Initial startup; (2) Normal operations; (3) Temporary operations; (4) Emergency shutdown and operations; (5) Normal shutdown; (6) Startup following a normal or emergency shutdown or a major change that... are updated, if necessary, whenever a major change occurs and prior to startup of the changed process. ...

  13. Simulation of the early startup period of high-temperature heat pipes from the frozen state by a rarefied vapor self-diffusion model

    NASA Technical Reports Server (NTRS)

    Cao, Y.; Faghri, A.

    1993-01-01

    The heat pipe startup process is described physically and is divided into five periods for convenience of analysis. The literature survey revealed that none of the previous attempts to simulate the heat pipe startup process numerically were successful, since the rarefied vapor flow in the heat pipe was not considered. Therefore, a rarefied vapor self-diffusion model is proposed, and the early startup periods, in which the rarefied vapor flow is dominant within the heat pipe, are first simulated numerically. The numerical results show that large vapor density gradients existed along the heat pipe length, and the vapor flow reaches supersonic velocities when the density is extremely low. The numerical results are compared with the experimental data of the early startup period with good agreement.

  14. Bacterial community shift during the startup of a full-scale oxidation ditch treating sewage.

    PubMed

    Chen, Yajun; Ye, Lin; Zhao, Fuzheng; Xiao, Lin; Cheng, Shupei; Zhang, Xu-Xiang

    2016-10-06

    Oxidation ditch (OD) is one of the most widely used processes for treating municipal wastewater. However, the microbial communities in the OD systems have not been well characterized and little information about the shift of bacterial community during the startup process of the OD systems is available. In this study, we investigated the bacterial community changes during the startup period (over 100 days) of a full-scale OD. The results showed that the bacterial community dramatically changed during the startup period. Similar to the activated sludge samples in other studies, Proteobacteria (accounting for 26.3%~48.4%) was the most dominant bacterial phylum in the OD system but its relative abundance declined nearly 40% during the startup process. It was also found that Planctomycetes proliferated greatly (from 4.79% to 13.5%) and finally replaced Bacteroidetes as the second abundant phylum in the OD system. Specifically, some bacteria affiliated with Flavobacterium genus of exhibited remarkable decreasing trends, while bacterial species belonging to OD1 candidate division and Saprospiraceae family were found to increase during the startup process. Despite of the bacterial community shift, the organic matter, nitrogen and phosphorus in the effluent were always in low concentrations, suggesting the functional redundancy of the bacterial community. Moreover, by comparing with the bacterial community in other municipal wastewater treatment bioreactors, some potentially novel bacterial species were found to be present in the OD system. Collectively, this study improved our understandings of bacterial community structure and the microbial ecology during the startup of full-scale wastewater treatment bioreactor.

  15. 40 CFR 61.33 - Stack sampling.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... which has an initial startup date preceding February 27, 2014; or (2) Within 90 days of startup in the case of a new source which did not have an initial startup date preceding February 27, 2014. (b) The... relative frequency of operation of different types of processes, operating hours, operating capacities, or...

  16. Rapid start-up of one-stage deammonification MBBR without addition of external inoculum.

    PubMed

    Kanders, Linda; Ling, Daniel; Nehrenheim, Emma

    2016-12-01

    In recent years, the anammox process has emerged as a useful method for robust and efficient nitrogen removal in wastewater treatment plants (WWTPs). This paper evaluates a one-stage deammonification (nitritation and anammox) start-up using carrier material without using anammox inoculum. A continuous laboratory-scale process was followed by full-scale operation with reject water from the digesters at Bekkelaget WWTP in Oslo, Norway. A third laboratory reactor was run in operational mode to verify the suitability of reject water from thermophilic digestion for the deammonification process. The two start-ups presented were run with indigenous bacterial populations, intermittent aeration and dilution, to favour growth of the anammox bacterial branches. Evaluation was done by chemical and fluorescence in situ hybridization analyses. The results demonstrate that anammox culture can be set up in a one-stage process only using indigenous anammox bacteria and that a full-scale start-up process can be completed in less than 120 days.

  17. 40 CFR 63.7720 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... operation and maintenance requirements in this subpart at all times, except during periods of startup... process and emissions control equipment. (c) You must develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3). The startup, shutdown, and malfunction plan also must...

  18. 40 CFR 63.7720 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operation and maintenance requirements in this subpart at all times, except during periods of startup... process and emissions control equipment. (c) You must develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3). The startup, shutdown, and malfunction plan also must...

  19. 40 CFR 63.7720 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... operation and maintenance requirements in this subpart at all times, except during periods of startup... process and emissions control equipment. (c) You must develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3). The startup, shutdown, and malfunction plan also must...

  20. 40 CFR 63.7720 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... operation and maintenance requirements in this subpart at all times, except during periods of startup... process and emissions control equipment. (c) You must develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3). The startup, shutdown, and malfunction plan also must...

  1. 40 CFR 63.7720 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... operation and maintenance requirements in this subpart at all times, except during periods of startup... process and emissions control equipment. (c) You must develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3). The startup, shutdown, and malfunction plan also must...

  2. Waste to Energy Potential - A High Concentration Anaerobic Bioreactor

    DTIC Science & Technology

    2012-05-23

    process • bacteria consume approximately 50-70% of the solids placed in the bioreactor and, generate a biogas • What do you get? • Biogas that can be...Symposium & Exhibition Objectives of the Demo • Establish the inoculation/startup procedures • Optimize presorting requirements • Evaluate biogas ...quality • Establish biogas pre-conditioning requirements • Understand the cause of upset conditions • Determine – optimal mixture of feedstock

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vanvick, T.W.

    The Logan Generating Plant (formerly Keystone Cogeneration Project) is a 230 MW (gross) pulverized coal cogeneration facility located on the Delaware River in Logan Township, New Jersey, off Route 130. Owned and operated by U.S. Generating Company, the plant was built by Bechtel Corporation, which provided engineering, procurement, construction, and startup services. Power from the plant is furnished to Atlantic Electric, and approximately 50,000 pounds of process steam per hour is provided to Monsanto`s adjacent facility. U.S. Generating Company is committed to operating plants with close attention to the environment and has developed a specific Environmental Mission Statement. This papermore » addresses some of the key environmental features at the Logan Generating Plant.« less

  4. An integrated aerobic-anaerobic strategy for performance enhancement of Pseudomonas aeruginosa-inoculated microbial fuel cell.

    PubMed

    Yong, Xiao-Yu; Yan, Zhi-Ying; Shen, Hai-Bo; Zhou, Jun; Wu, Xia-Yuan; Zhang, Li-Juan; Zheng, Tao; Jiang, Min; Wei, Ping; Jia, Hong-Hua; Yong, Yang-Chun

    2017-10-01

    Microbial fuel cell (MFC) is a promising device for energy generation and organic waste treatment simultaneously by electrochemically active bacteria (EAB). In this study, an integrated aerobic-anaerobic strategy was developed to improve the performance of P. aeruginosa-inoculated MFC. With an aerobic start-up and following an anaerobic discharge process, the current density of MFC reached a maximum of 99.80µA/cm 2 , which was 91.6% higher than the MFC with conventional constant-anaerobic operation. Cyclic voltammetry and HPLC analysis showed that aerobic start-up significantly increased electron shuttle (pyocyanin) production (76% higher than the constant-anaerobic MFC). Additionally, enhanced anode biofilm formation was also observed in the integrated aerobic-anaerobic MFC. The increased pyocyanin production and biofilm formation promoted extracellular electron transfer from EAB to the anode and were the underlying mechanism for the MFC performance enhancement. This work demonstrated the integrated aerobic-anaerobic strategy would be a practical strategy to enhance the electricity generation of MFC. Copyright © 2017 Elsevier Ltd. All rights reserved.

  5. 40 CFR 63.9583 - When do I have to comply with this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... new affected source and its initial startup date is on or before October 30, 2003, you must comply... initial startup date is after October 30, 2003, you must comply with each emission limitation, work... initial startup. (d) If your taconite iron ore processing plant is an area source that becomes a major...

  6. 40 CFR 63.9583 - When do I have to comply with this subpart?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... new affected source and its initial startup date is on or before October 30, 2003, you must comply... initial startup date is after October 30, 2003, you must comply with each emission limitation, work... initial startup. (d) If your taconite iron ore processing plant is an area source that becomes a major...

  7. 40 CFR 63.9583 - When do I have to comply with this subpart?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... new affected source and its initial startup date is on or before October 30, 2003, you must comply... initial startup date is after October 30, 2003, you must comply with each emission limitation, work... initial startup. (d) If your taconite iron ore processing plant is an area source that becomes a major...

  8. 40 CFR 63.9583 - When do I have to comply with this subpart?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... new affected source and its initial startup date is on or before October 30, 2003, you must comply... initial startup date is after October 30, 2003, you must comply with each emission limitation, work... initial startup. (d) If your taconite iron ore processing plant is an area source that becomes a major...

  9. 40 CFR 63.9583 - When do I have to comply with this subpart?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... new affected source and its initial startup date is on or before October 30, 2003, you must comply... initial startup date is after October 30, 2003, you must comply with each emission limitation, work... initial startup. (d) If your taconite iron ore processing plant is an area source that becomes a major...

  10. Emission characteristics and vapour/particulate phase distributions of PCDD/F in a hazardous waste incinerator under transient conditions

    PubMed Central

    Wang, Chao; Cen, Kefa; Ni, Mingjiang; Li, Xiaodong

    2018-01-01

    Polychlorinated dibenzo-p-dioxin and polychlorinated dibenzofuran (PCDD/F) emission characteristics and vapour/particulate phase partitions under three continued operation conditions, i.e. shut-down, start-up and after start-up, were investigated by sampling stack gas. The results indicated that the PCDD/F emission levels were 0.40–18.03 ng I-TEQ Nm−3, much higher than the annual monitoring level (0.016 ng I-TEQ Nm−3). Additionally, the PCDD/F emission levels in start-up were higher than the other two conditions. Furthermore, the PCDD/F congener profiles differed markedly between shut-down and start-up, and the chlorination degree of PCDD/F increased in shut-down and decreased evidently in start-up. Moreover, PCDD/F vapour/particulate phase distributions varied significantly under three transient conditions. The PCDD/F vapour phase proportion decreased as the shut-down process continued, then increased as the start-up process proceeded, finally more than 98% of the PCDD/F congeners were distributed in the vapour phase after start-up. The correlations between log(Cv/Cs) versus log pL0 of each PCDD/F congener in stack gas were disorganized in shut-down, and trend to a linear distribution after start-up. Besides, polychlorinated biphenyl emissions show behaviour similar to that of PCDD/F, and the lower chlorinated congeners have a stronger relationship with 2,3,7,8-PCDD/Fs, such as M1CB and D2CB. PMID:29410821

  11. Start-up performance of parabolic trough concentrating solar power plants

    NASA Astrophysics Data System (ADS)

    Ferruzza, Davide; Topel, Monika; Basaran, Ibrahim; Laumert, Björn; Haglind, Fredrik

    2017-06-01

    Concentrating solar power plants, even though they can be integrated with thermal energy storage, are still subjected to cyclic start-up and shut-downs. As a consequence, in order to maximize their profitability and performance, the flexibility with respect to transient operations is essential. In this regard, two of the key components identified are the steam generation system and steam turbine. In general it is desirable to have fast ramp-up rates during the start-up of a power plant. However ramp-up rates are limited by, among other things, thermal stresses, which if high enough can compromise the life of the components. Moreover, from an operability perspective it might not be optimal to have designs for the highest heating rates, as there may be other components limiting the power plant start-up. Therefore, it is important to look at the interaction between the steam turbine and steam generator to determine the optimal ramp rates. This paper presents a methodology to account for thermal stresses limitations during the power plant start up, aiming at identifying which components limit the ramp rates. A detailed dynamic model of a parabolic trough power plant was developed and integrated with a control strategy to account for the start-up limitations of both the turbine and steam generator. The models have been introduced in an existing techno-economic tool developed by the authors (DYESOPT). The results indicated that for each application, an optimal heating rates range can be identified. For the specific case presented in the paper, an optimal range of 7-10 K/min of evaporator heating rate can result in a 1.7-2.1% increase in electricity production compared to a slower component (4 K/min).

  12. Textile drying using solarized can dryers to demonstrate the application of solar energy to industrial drying or dehydration processes, Phase II. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mitchell, P.D.; Beesing, M.E.; Bessler, G.L.

    This program has resulted in the installation of a solar energy collection system for providing process heat to a textile drying process. The solar collection subsystem uses 700 square meters (7500 square feet) of parabolic trough, single-axis tracking, concentrating collectors to heat water in a high temperature water (HTW) loop. The solar collectors nominally generate 193/sup 0/C (380/sup 0/F) water with the HTW loop at 1.9 x 10/sup 6/ Pa (275 psi). A steam generator is fueled with the HTW and produces 450 kg/hour (1000 pounds per hour) of process steam at the nominal design point conditions. The solar-generated processmore » steam is at 0.5 x 10/sup 6/ Pa (75 psi) and 160/sup 0/C (321/sup 0/F). It is predicted that the solar energy system will provide 1.2 x 10/sup 6/ MJ/year (1.1 x 10/sup 9/ Btu/year) to the process. This is 46 percent of the direct isolation available to the collector field during the operational hours (300 days/year of the Fairfax mill. The process being solarized is textile drying using can dryers. The can dryers are part of a slashing operation in a WestPoint Pepperell mill in Fairfax, Alabama. Over 50 percent of all woven goods are processed through slashers and dried on can dryers. The collectors were fabricated by Honeywell at a pilot production facility in Minneapolis, Minnesota, under a 3000-square-meter (32,000-square-foot) production run. The collectors and other system components were installed at the site by the Bahnson Service Company and their subcontractors, acting as the project general contractor. System checkout and start-up was conducted. Preliminary system performance was determined from data collected during start-up. System design, fabrication and installation, data analysis, operation and maintenance procedures, and specifications and drawings are presented.« less

  13. 40 CFR 68.77 - Pre-startup review.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.77 Pre-startup review. (a) The... stationary sources when the modification is significant enough to require a change in the process safety... substances to a process: (1) Construction and equipment is in accordance with design specifications; (2...

  14. Improving startup performance with carbon mesh anodes in separator electrode assembly microbial fuel cells.

    PubMed

    Zhang, Fang; Xia, Xue; Luo, Yong; Sun, Dan; Call, Douglas F; Logan, Bruce E

    2013-04-01

    In a separator electrode assembly microbial fuel cell, oxygen crossover from the cathode inhibits current generation by exoelectrogenic bacteria, resulting in poor reactor startup and performance. To determine the best approach for improving startup performance, the effect of acclimation to a low set potential (-0.2V, versus standard hydrogen electrode) was compared to startup at a higher potential (+0.2 V) or no set potential, and inoculation with wastewater or pre-acclimated cultures. Anodes acclimated to -0.2 V produced the highest power of 1330±60 mW m(-2) for these different anode conditions, but unacclimated wastewater inocula produced inconsistent results despite the use of this set potential. By inoculating reactors with transferred cell suspensions, however, startup time was reduced and high power was consistently produced. These results show that pre-acclimation at -0.2 V consistently improves power production compared to use of a more positive potential or the lack of a set potential. Copyright © 2013 Elsevier Ltd. All rights reserved.

  15. Issues to Consider before Licensing Technology to a Start-Up: Mitigating Risk with Early Planning for the Entire Business Cycle

    ERIC Educational Resources Information Center

    LaBarge, Jeffrey H.

    2005-01-01

    If done correctly, licensing technology to a start-up company provides a great opportunity for a university to commercialize its technology and generate good will. If done incorrectly, however, the venture may jeopardize the technology's value and adversely affect the university's reputation within the business and academic communities. Before…

  16. A Guide for Developing Standard Operating Job Procedures for the Digestion Process Wastewater Treatment Facility. SOJP No. 10.

    ERIC Educational Resources Information Center

    Schwing, Carl M.

    This guide describes standard operating job procedures for the digestion process of wastewater treatment facilities. This process is for reducing the volume of sludge to be treated in subsequent units and to reduce the volatile content of sludge. The guide gives step-by-step instructions for pre-startup, startup, continuous operating, shutdown,…

  17. Electrically heated DPF start-up strategy

    DOEpatents

    Gonze, Eugene V [Pinckney, MI; Ament, Frank [Troy, MI

    2012-04-10

    An exhaust system that processes exhaust generated by an engine has a diesel particulate filter (DPF) that is disposed downstream of the engine and that filters particulates in the exhaust. An electrical heater is disposed upstream of the DPF and selectively heats the exhaust to initiate combustion of the particulates. Heat generated by combustion of particulates in the heater induces combustion of particulates within the DPF. A control module selectively enables current flow to the electrical heater for an initial period of a DPF regeneration cycle, and limits exhaust flow while the electrical heater is heating to a predetermined soot combustion temperature.

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dawson, F.N. Jr.

    The Dynacracking process developed by Hydrocarbon Research, Inc., is a non-catalytic process capable of upgrading heavy oil whose sulfur, metal, and carbon contents may be high. It converts residual stocks to distillates with high naphtha yields, and to synthetic fuel gas of high quality (700-800 Btu/ft/sup 3/). It has esentially no air polution emissions and requires a relatively small amount of water and utilities. The process generates sufficient heat internally such that, except for start-up, no boilers, furnaces, or external heaters are required to operate the plant. Several aspects of the process are discussed: chemistry, hardware, feedstock, flexibility in themore » product mix, product quality, and economics.« less

  19. An efficient start-up circuitry for de-energized ultra-low power energy harvesting systems

    NASA Astrophysics Data System (ADS)

    Hörmann, Leander B.; Berger, Achim; Salzburger, Lukas; Priller, Peter; Springer, Andreas

    2015-05-01

    Cyber-physical systems often include small wireless devices to measure physical quantities or control a technical process. These devices need a self-sufficient power supply because no wired infrastructure is available. Their operational time can be enhanced by energy harvesting systems. However, the convertible power is often limited and discontinuous which requires the need of an energy storage unit. If this unit (and thus the whole system) is de-energized, the start-up process may take a significant amount of time because of an inefficient energy harvesting process. Therefore, this paper presents a system which enables a safe and fast start-up from the de-energized state.

  20. A single center analysis of factors influencing study start-up timeline in clinical trials.

    PubMed

    Krafcik, Brianna M; Doros, Gheorghe; Malikova, Marina A

    2017-11-01

    Efficient start-up phase in clinical trials is crucial to execution. The goal was to determine factors contributing to delays. The start-up milestones were assessed for 38 studies and analyzed. Total start-up time was shorter for following studies: device trials, no outsourcing, fewer ancillary services used and in interventional versus observational designs. The use of a centralized Institutional Review Board (IRB) versus a local IRB reduced time to approval. Studies that never enrolled took longer on average to finalize their budget/contract, and obtain IRB than ones that did enroll. Different features of clinical trials can affect timeline of start-up process. An understanding of the impact of each feature allows for optimization.

  1. Policy implications of startup utilization by enrollees in prepaid group plans.

    PubMed

    Baloff, N; Griffith, M J

    1984-04-01

    This article discusses several policy implications of the so-called startup effect, in which high initial health services utilization by new enrollees in prepaid group plans ( PGPs ) becomes reduced with the increasing duration of membership. Results of research in a developing PGP are analyzed as they relate to a mathematical model of startups for two measures of enrollee use. After estimating the total costs of startups in this setting, the motivating effects of such costs on PGPs are examined in relation to several policy issues--including the rate of PGP development in the United States, the use of financial incentives to enroll the elderly and medically disadvantaged, potential inequities of premium determination, the large impact of startups on disenrollment , and the federally mandated process of annual announcement of benefits and open enrollment. Ideas and mechanisms for future study on the startup effect and its policy implications are discussed.

  2. Policy implications of startup utilization by enrollees in prepaid group plans.

    PubMed Central

    Baloff, N; Griffith, M J

    1984-01-01

    This article discusses several policy implications of the so-called startup effect, in which high initial health services utilization by new enrollees in prepaid group plans ( PGPs ) becomes reduced with the increasing duration of membership. Results of research in a developing PGP are analyzed as they relate to a mathematical model of startups for two measures of enrollee use. After estimating the total costs of startups in this setting, the motivating effects of such costs on PGPs are examined in relation to several policy issues--including the rate of PGP development in the United States, the use of financial incentives to enroll the elderly and medically disadvantaged, potential inequities of premium determination, the large impact of startups on disenrollment , and the federally mandated process of annual announcement of benefits and open enrollment. Ideas and mechanisms for future study on the startup effect and its policy implications are discussed. PMID:6724954

  3. Advanced Research Deposition System (ARDS) for processing CdTe solar cells

    NASA Astrophysics Data System (ADS)

    Barricklow, Keegan Corey

    CdTe solar cells have been commercialized at the Gigawatt/year level. The development of volume manufacturing processes for next generation CdTe photovoltaics (PV) with higher efficiencies requires research systems with flexibility, scalability, repeatability and automation. The Advanced Research Deposition Systems (ARDS) developed by the Materials Engineering Laboratory (MEL) provides such a platform for the investigation of materials and manufacturing processes necessary to produce the next generation of CdTe PV. Limited by previous research systems, the ARDS was developed to provide process and hardware flexibility, accommodating advanced processing techniques, and capable of producing device quality films. The ARDS is a unique, in-line process tool with nine processing stations. The system was designed, built and assembled at the Materials Engineering Laboratory. Final assembly, startup, characterization and process development are the focus of this research. Many technical challenges encountered during the startup of the ARDS were addressed in this research. In this study, several hardware modifications needed for the reliable operation of the ARDS were designed, constructed and successfully incorporated into the ARDS. The effect of process condition on film properties for each process step was quantified. Process development to achieve 12% efficient baseline solar cell required investigation of discrete processing steps, troubleshooting process variation, and developing performance correlations. Subsequent to this research, many advances have been demonstrated with the ARDS. The ARDS consistently produces devices of 12% +/-.5% by the process of record (POR). The champion cell produced to date utilizing the ARDS has an efficiency of 16.2% on low cost commercial sodalime glass and utilizes advanced films. The ARDS has enabled investigation of advanced concepts for processing CdTe devices including, Plasma Cleaning, Plasma Enhanced Closed Space Sublimation (PECSS), Electron Reflector (ER) using Cd1-xMgxTe (CMT) structure and alternative device structures. The ARDS has been instrumental in the collaborative research with many institutions.

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wu, Ping; Deng, Yuqun; Science and Technology on High Power Microwave Laboratory, Northwest Institute of Nuclear Technology, Xi'an 710024

    In relativistic backward wave oscillators (RBWOs), although the slow wave structure (SWS) and electron beam determine the main characteristics of beam-wave interaction, many other factors can also significantly affect the microwave generation process. This paper investigates the influence of voltage rise time on beam-wave interaction in RBWOs. Preliminary analysis and PIC simulations demonstrate if the voltage rise time is moderately long, the microwave frequency will gradually increase during the startup process until the voltage reaches its amplitude, which can be explained by the dispersion relation. However, if the voltage rise time is long enough, the longitudinal resonance of the finitely-longmore » SWS will force the RBWO to work with unwanted longitudinal modes for a while and then gradually hop to the wanted longitudinal mode, and this will lead to an impure microwave frequency spectrum. Besides, a longer voltage rise time will delay the startup process and thus lead to a longer microwave saturation time. And if unwanted longitudinal modes are excited due to long voltage rise time, the microwave saturation time will be further lengthened. Therefore, the voltage rise time of accelerators adopted in high power microwave technology should not be too long in case unwanted longitudinal modes are excited.« less

  5. Entrepreneurial patent management in pharmaceutical startups.

    PubMed

    Holgersson, Marcus; Phan, Tai; Hedner, Thomas

    2016-07-01

    Startups fill an increasingly important role as innovators in the pharmaceutical industry, and patenting is typically central to their success. This article aims to explore patent management in pharmaceutical startups. The results show that startups need to deal with several challenges related to patenting and an 'entrepreneurial' approach to patent management is called for. Resource constraints, venture capital provision, exits and other conditions and events must be readily considered in the patent management process to build a successful pharmaceutical venture, something that could benefit the pharmaceutical industry as a whole. Copyright © 2016 Elsevier Ltd. All rights reserved.

  6. Solenoid-free plasma startup in NSTX using transient CHI

    NASA Astrophysics Data System (ADS)

    Raman, R.; Jarboe, T. R.; Mueller, D.; Nelson, B. A.; Bell, M. G.; Bell, R.; Gates, D.; Gerhardt, S.; Hosea, J.; Kaita, R.; Kugel, H.; LeBlanc, B.; Maingi, R.; Maqueda, R.; Menard, J.; Nagata, M.; Ono, M.; Paul, S.; Roquemore, L.; Sabbagh, S.; Soukhanovskii, V.; Taylor, G.

    2009-06-01

    Experiments in NSTX have now demonstrated the coupling of toroidal plasmas produced by the technique of coaxial helicity injection (CHI) to inductive sustainment and ramp-up of the toroidal plasma current. In these discharges, the central Ohmic transformer was used to apply an inductive loop voltage to discharges with a toroidal current of about 100 kA created by CHI. The coupled discharges have ramped up to >700 kA and transitioned into an H-mode demonstrating compatibility of this startup method with conventional operation. The electron temperature in the coupled discharges reached over 800 eV and the resulting plasma had low inductance, which is preferred for long-pulse high-performance discharges. These results from NSTX in combination with the previously obtained record 160 kA non-inductively generated startup currents in an ST or tokamak in NSTX demonstrate that CHI is a viable solenoid-free plasma startup method for future STs and tokamaks.

  7. Self-Employment for People with Disabilities in the United States: A Recommended Process for Vocational Rehabilitation Agencies.

    ERIC Educational Resources Information Center

    Arnold, Nancy; Seekins, Tom; Ipsen, Catherine; Colling, Kyle

    2003-01-01

    Recommends a research-based process for rehabilitation agencies assisting clients with self-employment. Steps include counselor-client dialog about self-employment, use of assessment tools and resources, education/training, development of a business plan, start-up funding from the agency and other sources, business start-up, and evaluation of…

  8. Mathematical modeling and analysis of heat pipe start-up from the frozen state

    NASA Technical Reports Server (NTRS)

    Jang, Jong Hoon; Faghri, Amir; Chang, Won Soon; Mahefkey, Edward T.

    1989-01-01

    The start-up process of a frozen heat pipe is described and a complete mathematical model for the start-up of the frozen heat pipe is developed based on the existing experimental data, which is simplified and solved numerically. The two-dimensional transient model for the wall and wick is coupled with the one-dimensional transient model for the vapor flow when vaporization and condensation occur at the interface. A parametric study is performed to examine the effect of the boundary specification at the surface of the outer wall on the successful start-up from the frozen state. For successful start-up, the boundary specification at the outer wall surface must melt the working substance in the condenser before dry-out takes place in the evaporator.

  9. Mathematical modeling and analysis of heat pipe start-up from the frozen state

    NASA Technical Reports Server (NTRS)

    Jang, J. H.; Faghri, A.; Chang, W. S.; Mahefkey, E. T.

    1990-01-01

    The start-up process of a frozen heat pipe is described and a complete mathematical model for the start-up of the frozen heat pipe is developed based on the existing experimental data, which is simplified and solved numerically. The two-dimensional transient model for the wall and wick is coupled with the one-dimensional transient model for the vapor flow when vaporization and condensation occur at the interface. A parametric study is performed to examine the effect of the boundary specification at the surface of the outer wall on the successful start-up from the frozen state. For successful start-up, the boundary specification at the outer wall surface must melt the working substance in the condenser before dry-out takes place in the evaporator.

  10. Long pulse EBW start-up experiments in MAST

    DOE PAGES

    Shevchenko, V. F.; Baranov, Y. F.; Bigelow, T.; ...

    2015-03-12

    Start-up technique reported here relies on a double mode conversion (MC) for electron Bernstein wave (EBW) excitation. It consists of MC of the ordinary (O) mode, entering the plasma from the low field side of the tokamak, into the extraordinary (X) mode at a mirror-polarizer located at the high field side. The X mode propagates back to the plasma, passes through electron cyclotron resonance (ECR) and experiences a subsequent X to EBW MC near the upper hybrid resonance (UHR). Finally the excited EBW mode is totally absorbed at the Doppler shifted ECR. The absorption of EBW remains high even inmore » cold rarefied plasmas. Furthermore, EBW can generate significant plasma current giving the prospect of a fully solenoid-free plasma start-up. First experiments using this scheme were carried out on MAST [1]. Plasma currents up to 33 kA have been achieved using 28 GHz 100kW 90ms RF pulses. Recently experimental results were extended to longer RF pulses showing further increase of plasma currents generated by RF power alone. A record current of 73kA has been achieved with 450ms RF pulse of similar power. The current drive enhancement was mainly achieved due to RF pulse extension and further optimisation of the start-up scenario.« less

  11. Long pulse EBW start-up experiments in MAST

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shevchenko, V. F.; Baranov, Y. F.; Bigelow, T.

    Start-up technique reported here relies on a double mode conversion (MC) for electron Bernstein wave (EBW) excitation. It consists of MC of the ordinary (O) mode, entering the plasma from the low field side of the tokamak, into the extraordinary (X) mode at a mirror-polarizer located at the high field side. The X mode propagates back to the plasma, passes through electron cyclotron resonance (ECR) and experiences a subsequent X to EBW MC near the upper hybrid resonance (UHR). Finally the excited EBW mode is totally absorbed at the Doppler shifted ECR. The absorption of EBW remains high even inmore » cold rarefied plasmas. Furthermore, EBW can generate significant plasma current giving the prospect of a fully solenoid-free plasma start-up. First experiments using this scheme were carried out on MAST [1]. Plasma currents up to 33 kA have been achieved using 28 GHz 100kW 90ms RF pulses. Recently experimental results were extended to longer RF pulses showing further increase of plasma currents generated by RF power alone. A record current of 73kA has been achieved with 450ms RF pulse of similar power. The current drive enhancement was mainly achieved due to RF pulse extension and further optimisation of the start-up scenario.« less

  12. Long Pulse EBW Start-up Experiments in MAST

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shevchenko, V. F.; Bigelow, Tim S; Caughman, J. B. O.

    Start-up technique reported here relies on a double mode conversion (MC) for electron Bernstein wave (EBW) excitation. It consists of MC of the ordinary (0) mode, entering the plasma from the low field side of the tokamak, into the extraordinary (X) mode at a mirror-polarizer located at the high field side. The X mode propagates back to the plasma, passes through electron cyclotron resonance (ECR) and experiences a subsequent X to EBW MC near the upper hybrid resonance (UHR). Finally the excited EBW mode is totally absorbed at the Doppler shifted ECR. The absorption of EBW remains high even inmore » cold rarefied plasmas. Furthermore, EBW can generate significant plasma current giving the prospect of a fully solenoid-free plasma start-up. First experiments using this scheme were carried out on MAST [1]. Plasma currents up to 33 kA have been achieved using 28 GHz 100kW 90ms RF pulses. Recently experimental results were extended to longer RF pulses showing further increase of plasma currents generated by RF power alone. A record current of 73kA has been achieved with 450ms RF pulse of similar power. The current drive enhancement was mainly achieved due to RF pulse extension and further optimisation of the start-up scenario.« less

  13. The Role of Startups

    ScienceCinema

    Babinec, Sue; Kirkpatrick, Doug

    2018-05-30

    Many ARPA-E-funded universities and research institutions have created start-up companies to further catalyze their next-generation technologies. Ambri and BlackPak are two examples of ARPA-E projects that were spun out by other institutions—Massachusetts Institute of Technology and SRI International, respectively—in an effort to get their technologies out of the lab and into the market quickly. This video features remarks from ARPA-E Senior Commercialization Advisor Sue Babinec and interviews with technologists at Ambri and BlackPak, who each tell the story of how their new companies spun out of the lab and have become agile startups capable of delivering real products to the marketplace.

  14. The Role of Startups

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Babinec, Sue; Kirkpatrick, Doug

    2015-02-11

    Many ARPA-E-funded universities and research institutions have created start-up companies to further catalyze their next-generation technologies. Ambri and BlackPak are two examples of ARPA-E projects that were spun out by other institutions—Massachusetts Institute of Technology and SRI International, respectively—in an effort to get their technologies out of the lab and into the market quickly. This video features remarks from ARPA-E Senior Commercialization Advisor Sue Babinec and interviews with technologists at Ambri and BlackPak, who each tell the story of how their new companies spun out of the lab and have become agile startups capable of delivering real products to themore » marketplace.« less

  15. When do drilling alliances add value? The alliance value model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brett, J.F.; Craig, V.B.; Wadsworth, D.B.

    1996-12-31

    A recent GRI report details three previously unstudied aspects of alliances: specific measurable factors that improve alliance success, how a successful alliance should be structured, and when an alliance makes economic sense. The most innovative tool to emerge from the report, the Alliance Value Model, addresses the third aspect. The theory behind the Alliance Value Model is that the long-term viability of any drilling relationship hinges on its ability to create real value and achieve stability. Based upon the report`s findings, the most effective way to form such an alliance is through a detailed description and integration of the technicalmore » processes involved. This new type of process-driven alliance is characterized by a value chain which links together a common set of technical processes, mutually defined bottomline goals, and shared benefits. Building a process-driven alliance requires time and people and therefore has an associated cost. The real value generated by an alliance must exceed this start-up cost. The Alliance Value Model computes the net present value (NPV) of the cash flows for four different operating arrangements: (1) Business As Usual (conventional competitive bidding process), (2) Process-Driven Alliance (linking technical processes to accelerate production and reduce expenses), (3) Incentivized Process-Driven Alliance (linked technical processes with performance incentives to promote stability), and (4) No Drill Case (primarily used to gauge the market value of services). These arrangements test different degrees of process integration between an operator and its suppliers. They can also help determine if the alliance can add enough value to exceed startup costs and if the relationship will be stable. Each partner can test the impact of the relational structure on its own profitability. When an alliance is warranted, all participants can benefit from real value generated in a stable relationship.« less

  16. Ebw Assisted Plasma Current Startup in Mast

    NASA Astrophysics Data System (ADS)

    Shevchenko, Vladimir; Saveliev, Alexander

    2009-04-01

    EBW current drive assisted plasma current start-up has been demonstrated for the first time in a tokamak. It was shown that plasma currents up to 17 kA can be generated non-inductively by 100 kW of RF power injected. With optimized vertical field ramps, plasma currents up to 33 kA have been achieved without the use of solenoid flux. With limited solenoid assist (0.2 V × 20 ms, less than 0.5% of total solenoid flux), plasma currents up to 55 kA have been generated and sustained further non-inductively. Experimentally obtained plasma currents are consistent with Fokker-Planck modelling.

  17. Effect of Start-Up Strategies and Electrode Materials on Carbon Dioxide Reduction on Biocathodes

    PubMed Central

    Singh, Abhijeet; Hermansson, Malte; Persson, Frank; Schnürer, Anna; Wilén, Britt-Marie; Modin, Oskar

    2017-01-01

    ABSTRACT The enrichment of CO2-reducing microbial biocathodes is challenging. Previous research has shown that a promising approach could be to first enrich bioanodes and then lower the potential so the electrodes are converted into biocathodes. However, the effect of such a transition on the microbial community on the electrode has not been studied. The goal of this study was thus to compare the start-up of biocathodes from preenriched anodes with direct start-up from bare electrodes and to investigate changes in microbial community composition. The effect of three electrode materials on the long-term performance of the biocathodes was also investigated. In this study, preenrichment of acetate-oxidizing bioanodes did not facilitate the start-up of biocathodes. It took about 170 days for the preenriched electrodes to generate substantial cathodic current, compared to 83 days for the bare electrodes. Graphite foil and carbon felt cathodes produced higher current at the beginning of the experiment than did graphite rods. However, all electrodes produced similar current densities at the end of the over 1-year-long study (2.5 A/m2). Methane was the only product detected during operation of the biocathodes. Acetate was the only product detected after inhibition of the methanogens. Microbial community analysis showed that Geobacter sp. dominated the bioanodes. On the biocathodes, the Geobacter sp. was succeeded by Methanobacterium spp., which made up more than 80% of the population. After inhibition of the methanogens, Acetobacterium sp. became dominant on the electrodes (40% relative abundance). The results suggested that bioelectrochemically generated H2 acted as an electron donor for CO2 reduction. IMPORTANCE In microbial electrochemical systems, living microorganisms function as catalysts for reactions on the anode and/or the cathode. There is a variety of potential applications, ranging from wastewater treatment and biogas generation to production of chemicals. Systems with biocathodes could be used to reduce CO2 to methane, acetate, or other high-value chemicals. The technique can be used to convert solar energy to chemicals. However, enriching biocathodes that are capable of CO2 reduction is more difficult and less studied than enriching bioanodes. The effect of different start-up strategies and electrode materials on the microbial communities that are enriched on biocathodes has not been studied. The purpose of this study was to investigate two different start-up strategies and three different electrode materials for start-up and long-term operation of biocathodes capable of reducing CO2 to valuable biochemicals. PMID:29222104

  18. Advanced radiator concepts feasibility demonstration

    NASA Astrophysics Data System (ADS)

    Rhee, Hyop S.; Begg, Lester; Wetch, Joseph R.; Juhasz, Albert J.

    1991-01-01

    An innovative pumped loop concept for 600 K space power system radiators is under development utilizing direct contact heat transfer, which facilitates repeated startup/shutdown of the power system without complex and time-consuming coolant thawing during power startup. The melting/freezing process of Li in a NaK flow was studied experimentally to demonstrate the Li/NaK radiator feasibility during startup (thawing) and shutdown (cold-trapping). Results of the vapor grown carbon fiber/composite thermal conductivity measurements are also presented.

  19. Advanced radiator concepts feasibility demonstration

    NASA Astrophysics Data System (ADS)

    Rhee, Hyop S.; Begg, Lester; Wetch, Joseph R.; Juhasz, Albert J.

    An innovative pumped loop concept for 600 K space power system radiators is under development utilizing direct contact heat transfer, which facilitates repeated startup/shutdown of the power system without complex and time-consuming coolant thawing during power startup. The melting/freezing process of Li in a NaK flow was studied experimentally to demonstrate the Li/NaK radiator feasibility during startup (thawing) and shutdown (cold-trapping). Results of the vapor grown carbon fiber/composite thermal conductivity measurements are also presented.

  20. 77 FR 72294 - Reconsideration of Certain New Source and Startup/Shutdown Issues: National Emission Standards...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-05

    ... Emission Standards for Hazardous Air Pollutants From Coal- and Oil-Fired Electric Utility Steam Generating...-Institutional, and Small Industrial-Commercial- Institutional Steam Generating Units Correction Proposed rule...

  1. Method for controlling start-up and steady state performance of a closed split flow recompression brayton cycle

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pasch, James Jay

    A method of resolving a balanced condition that generates control parameters for start-up and steady state operating points and various component and cycle performances for a closed split flow recompression cycle system. The method provides for improved control of a Brayton cycle thermal to electrical power conversion system. The method may also be used for system design, operational simulation and/or parameter prediction.

  2. Demonstration of plasma start-up by Coaxial Helicity Injection

    NASA Astrophysics Data System (ADS)

    Raman, Roger

    2003-10-01

    Experimental results on the first successful transfer of a Coaxial-Helicity-Injection- (CHI)-produced discharge to inductive operation are reported. CHI assisted plasma start-up is more robust than inductive-only operation and reduces volt-seconds consumption. After hand-off for inductive operation, the initial 100 kA of CHI-produced current drops to 44 kA, then ramps up to 180 kA, using only 30 mVs, more than 30induction alone. Coupling a CHI-produced discharge to induction from a pre-charged central solenoid has produced record plasma currents of 265kA in HIT-II. CHI discharges can also be generated while the central transformer is in the process of being pre-charged, during which period it induces a negative loop voltage on the CHI discharge. Such capability is believed to be important for a short pulse burning plasma experiment that could contain a solenoid. In the latest results, which improve upon the earlier work (Raman et. al., Phys. Rev. Lett., 90, (2003) 075005-1), no transient coil currents are necessary for the CHI produced closed flux generation. This is particularly important for a reactor in which the poloidal field coils would be located outside blanket structures. Three important results are reported. First, CHI is shown to produce closed flux plasma. Second, it is shown that electrode-based CHI plasmas can be sufficiently clean for fusion research purposes. Finally, it is shown that CHI discharges, in addition to generating useful startup current, improve the performance of inductive discharges. This work was motivated by earlier experiments on HIT-II and NSTX that showed coupling of the inductive drive to the external CHI power supply circuit, instead of to the main plasma discharge. These important results were obtained on the HIT-II spherical torus experiment (R/a of 0.3/0.2m, elongation of 1.5).

  3. 40 CFR 63.11496 - What are the standards and compliance requirements for process vents?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Startup, shutdown, malfunction (SSM). Section 63.998(b)(2)(iii),(b)(6)(i)(A), and (d)(3) do not apply for.... (i) Startup, shutdown, and malfunction (SSM). References to SSM provisions in subparts that are...

  4. 40 CFR 63.11496 - What are the standards and compliance requirements for process vents?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Startup, shutdown, malfunction (SSM). Section 63.998(b)(2)(iii),(b)(6)(i)(A), and (d)(3) do not apply for.... (i) Startup, shutdown, and malfunction (SSM). References to SSM provisions in subparts that are...

  5. 40 CFR 63.11496 - What are the standards and compliance requirements for process vents?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Startup, shutdown, malfunction (SSM). Section 63.998(b)(2)(iii),(b)(6)(i)(A), and (d)(3) do not apply for.... (i) Startup, shutdown, and malfunction (SSM). References to SSM provisions in subparts that are...

  6. Start up system for hydrogen generator used with an internal combustion engine

    NASA Technical Reports Server (NTRS)

    Houseman, J.; Cerini, D. J. (Inventor)

    1977-01-01

    A hydrogen generator provides hydrogen rich product gases which are mixed with the fuel being supplied to an internal combustion engine for the purpose of enabling a very lean mixture of that fuel to be used, whereby nitrous oxides emitted by the engine are minimized. The hydrogen generator contains a catalyst which must be heated to a pre-determined temperature before it can react properly. To simplify the process of heating up the catalyst at start-up time, either some of the energy produced by the engine such as engine exhaust gas, or electrical energy produced by the engine, or the engine exhaust gas may be used to heat up air which is then used to heat the catalyst.

  7. Estimation of the ionic charge of non-metallic species into an electrical discharge through a web application

    NASA Astrophysics Data System (ADS)

    Pérez Gutiérrez, B. R.; Vera-Rivera, F. H.; Niño, E. D. V.

    2016-08-01

    Estimate the ionic charge generated in electrical discharges will allow us to know more accurately the concentration of ions implanted on the surfaces of nonmetallic solids. For this reason, in this research a web application was developed to allow us to calculate the ionic charge generated in an electrical discharge from the experimental parameters established in an ion implantation process performed in the JUPITER (Joint Universal Plasma and Ion Technologies Experimental Reactor) reactor. The estimated value of the ionic charge will be determined from data acquired on an oscilloscope, during startup and shutdown of electrical discharge, which will then be analyzed and processed. The study will provide best developments with regard to the application of ion implantation in various industrial sectors.

  8. A Generalized Precharging Strategy for Soft Startup Process of the Modular Multilevel Converter-Based HVDC Systems

    DOE PAGES

    Zhang, Lei; Qin, Jiangchao; Wu, Xiajie; ...

    2017-01-01

    The modular multilevel converter (MMC) has become one of the most promising converter technologies for medium/high-power applications, specifically for highvoltage direct current (HVDC) transmission systems. One of the technical challenges associated with the operation and control of the MMC-based system is to precharge the submodule (SM) capacitors to their nominal voltage during the startup process. In this paper, considering various SM circuits, a generalized precharging strategy is proposed for the MMC-based systems, which can implement soft stratup from dc or ac side. Furthermore, the proposed precharging strategy can be applicabe for various SM circuits and MMC configurations. The proposed startupmore » strategy does not require extra measurements and/or auxiliary power supplies. The charging current is controlled by adjusting the changing rate of the number of blocked and bypassed SM capacitors. Based on the proposed startup strategy, the startup processes of MMC/MMC-HVDC systems based on various SM circuits are analyzed and a generalized startup procedure for various MMC-HVDC systems is proposed. In addition, the uncontrollable steady-state SM capacitor voltages of various MMC-based systems are analyzed and determined, potentially useful in SM design. Our performance of the proposed strategy for various MMC-HVDC systems is evaluated based on time-domain simulation studies in the PSCAD/EMTDC software environment and experimental results based on a scaled-down prototype.« less

  9. A Generalized Precharging Strategy for Soft Startup Process of the Modular Multilevel Converter-Based HVDC Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhang, Lei; Qin, Jiangchao; Wu, Xiajie

    The modular multilevel converter (MMC) has become one of the most promising converter technologies for medium/high-power applications, specifically for highvoltage direct current (HVDC) transmission systems. One of the technical challenges associated with the operation and control of the MMC-based system is to precharge the submodule (SM) capacitors to their nominal voltage during the startup process. In this paper, considering various SM circuits, a generalized precharging strategy is proposed for the MMC-based systems, which can implement soft stratup from dc or ac side. Furthermore, the proposed precharging strategy can be applicabe for various SM circuits and MMC configurations. The proposed startupmore » strategy does not require extra measurements and/or auxiliary power supplies. The charging current is controlled by adjusting the changing rate of the number of blocked and bypassed SM capacitors. Based on the proposed startup strategy, the startup processes of MMC/MMC-HVDC systems based on various SM circuits are analyzed and a generalized startup procedure for various MMC-HVDC systems is proposed. In addition, the uncontrollable steady-state SM capacitor voltages of various MMC-based systems are analyzed and determined, potentially useful in SM design. Our performance of the proposed strategy for various MMC-HVDC systems is evaluated based on time-domain simulation studies in the PSCAD/EMTDC software environment and experimental results based on a scaled-down prototype.« less

  10. From a Student of Startup Business to a Startup Employee or Entrepreneur: Study on Career Narratives of Students in Entrepreneurial Programs in a University

    ERIC Educational Resources Information Center

    Saukkonen, Juha

    2017-01-01

    The purpose of this research is to gain an understanding of the incidents, relationships and processes that support entrepreneurial students to become employees and entrepreneurs. Through a qualitative approach based on career history and projections written by the respondents, this study aims to shed light on the process of becoming an…

  11. Efficiency arcjet thruster with controlled arc startup and steady state attachment

    NASA Technical Reports Server (NTRS)

    Smith, William W. (Inventor); Knowles, Steven C. (Inventor)

    1989-01-01

    An improved efficiency arcjet thruster has a constrictor and electrically-conductive nozzle anode defining an arc chamber, and an electrically-conductive rod having a tip spaced upstream from the constrictor and defining a cathode spaced from the anode by a gap generally coextensive with the arc chamber. An electrical potential is applied to the anode and cathode to generate an electrical arc in the arc chamber from the cathode to anode. Catalytically decomposed hydrazine is supplied to the arc chamber with generation of the arc so as to produce thermal heating and expansion thereof through the nozzle. The constrictor can have a electrically insulative portion disposed between the cathode tip and the nozzle anode, and an electrically-conductive anode extension disposed along the insulative portion so as to define an auxiliary gap with the cathode tip substantially smaller than the gap defined between the cathode and nozzle anode for facilitating startup of arc generation. The constrictor can also include an electrically-conductive electrode with a variable electrical potential to vary the shape of the arc generated in the arc chamber. Also, the cathode is mounted for axial movement such that the gap between its tip and the nozzle anode can be varied to facilitate a generally nonerosive generation of the electrical arc at startup and reliable steady state operation. Further, the arc chamber can have a nonparallel subsonic-to-supersonic transition configuration, or alternatively solely a nonparallel supersonic configuration, for improved arc attachment.

  12. Effect of pre-acclimation of granular activated carbon on microbial electrolysis cell startup and performance.

    PubMed

    LaBarge, Nicole; Yilmazel, Yasemin Dilsad; Hong, Pei-Ying; Logan, Bruce E

    2017-02-01

    Microbial electrolysis cells (MECs) can generate methane by fixing carbon dioxide without using expensive catalysts, but the impact of acclimation procedures on subsequent performance has not been investigated. Granular activated carbon (GAC) was used to pre-enrich electrotrophic methanogenic communities, as GAC has been shown to stimulate direct transfer of electrons between different microbial species. MEC startup times using pre-acclimated GAC were improved compared to controls (without pre-acclimation or without GAC), and after three fed batch cycles methane generation rates were similar (P>0.4) for GAC acclimated to hydrogen (22±9.3nmolcm -3 d -1 ), methanol (25±9.7nmolcm -3 d -1 ), and a volatile fatty acid (VFA) mix (22±11nmolcm -3 d -1 ). However, MECs started with GAC but no pre-acclimation had lower methane generation rates (13±4.1nmolcm -3 d -1 ), and MECs without GAC had the lowest rates (0.7±0.8nmolcm -3 d -1 after cycle 2). Microbes previously found in methanogenic MECs, or previously shown to be capable of exocellular electron transfer, were enriched on the GAC. Pre-acclimation using GAC is therefore a simple approach to enrich electroactive communities, improve methane generation rates, and decrease startup times in MECs. Copyright © 2016 Elsevier B.V. All rights reserved.

  13. [In search of a travel guide-results from a survey of E‑health startup companies].

    PubMed

    Hagen, Julia; Lauer, Wolfgang

    2018-03-01

    As is the case in other sectors, innovative digital products have started to enter the health market, too. If digital products like apps are considered medical devices, startups are often confronted with regulatory procedures that they deem to be slow and with which they are not familiar. This applies to both the certification procedures and the requirements and procedures for reimbursement, where problems could occur. The aim of this article is to better understand the startups' experience in navigating through these procedures, the hurdles they encounter, and their need for support. Therefore, the digital association Bitkom e. V. and the Federal Institute for Drugs and Medical Devices (BfArM) conducted a web-based survey on five themes with a total of 23 questions. These questions focused inter alia on the composition of the team, product planning, familiarity with regulatory requirements, experience with institutions and different sources of information, the assessment of challenges in the process, and the resulting need for support.The analysis on the basis of 18 complete replies has shown that startups work on products with documentation and communications functions, but also integrate diagnostic and therapeutic features. The latter are characteristics of medical devices. Startups consider themselves to be relatively familiar with regulatory requirements regarding medical devices. The largest hurdles are associated with reimbursement: long and costly processes until the startups' products could be reimbursed.Both with regard to reimbursement and certification, startups see a need for low-threshold, cost-efficient advisory services and a simplification and acceleration of existing procedures with regard to medical devices.

  14. Design study of an advanced gas generator. [which can be ignited during start-up period of turbine engines

    NASA Technical Reports Server (NTRS)

    Kim, S.; Trinh, H. P.

    1993-01-01

    A gas generator which can be ignited reliably during the initial start-up period and offers fairly uniform gas temperature at the exit was studied numerically. Various sizes and shapes of the mixing enhancement devices and their positions were examined to evaluate the uniformity of the exit gas temperature and the change of internal pressure drop incurred by introducing the mixing enhancement devices. By introducing a turbulence ring and a splash plate with an appropriate size and position, it was possible to obtain fairly uniform gas temperature distributions and a maximum gas temperature that is within the design limit temperature of 1600 R at the generator exit. However, with the geometry studied, the pressure drop across the generator was great, approximately 1150 psi, to satisfy the assigned design limit temperature. If the design limit temperature is increased to 1650 R, the pressure drop across the generator could be lowered by as much as 350 psi.

  15. Impact of the start-up process on the microbial communities in biocathodes for electrosynthesis.

    PubMed

    Mateos, Raúl; Sotres, Ana; Alonso, Raúl M; Escapa, Adrián; Morán, Antonio

    2018-06-01

    This study seeks to understand how the bacterial communities that develop on biocathodes are influenced by inocula diversity and electrode potential during start-up. Two different inocula are used: one from a highly diverse environment (river mud) and the other from a low diverse milieu (anaerobic digestion). In addition, both inocula were subjected to two different polarising voltages: oxidative (+0.2 V vs. Ag/AgCl) and reductive (-0.8 V vs. Ag/AgCl). Bacterial communities were analysed by means of high throughput sequencing. Possible syntrophic interactions and competitions between archaea and eubacteria were described together with a discussion of their potential role in product formation and current production. The results confirmed that reductive potentials lead to an inconsistent start-up procedure regardless of the inoculum used. However, imposing oxidative potentials help to quickly develop an electroactive biofilm ready to withstand reductive potentials (i.e. biocathodic operation). The microbial structure that finally developed on them was highly dependent on the raw community present in the inoculum. Using a non-specialised inoculum resulted in a highly specialised biofilm, which was accompanied by an improved performance in terms of consumed current and product generation. Interestingly, a much more specialised inoculum promoted a rediversification in the biofilm, with a lower general cell performance. Copyright © 2018 Elsevier B.V. All rights reserved.

  16. Design, Fabrication and Testing of Two Different Laboratory Prototypes of CSI-based Induction Heating Units

    NASA Astrophysics Data System (ADS)

    Roy, M.; Sengupta, M.

    2012-09-01

    Induction heating is a non-contact heating process which became popular due to its energy efficiency. Current source inverter (CSI) based induction heating units are commonly used in the industry. Most of these CSIs are thyristor based, since thyristors of higher ratings are easily available. These being load commutated apparatus a start-up circuit is needed to initiate commutation. In this paper the design and fabrication of two laboratory prototypes have been presented. The first one, a SCR-based CSI fed controlled induction heating unit (IHU), has been tested with two different types of start-up procedures. Thereafter the fabrication and performance of another IGBT-based CSI is compared with the thyristor-based CSI for a 2 kW, 10 kHz application. These two types of CSIs are fully fabricated in laboratory along with the IHU. Performance analysis and simulation of two different CSIs has been done by using SequelGUI2. The triggering pulses for the inverter devices (for both CSI devices as well as auxilliary thyristor of start-up circuit) have been generated and closed-loop control has been done in FPGA platform built around an Altera make cyclone EPIC12Q240C processor which can be programmed using Quartus II software. Close agreement between simulated and experimental results highlight the accuracy of the experimental work.

  17. Evaluation of a hybrid anaerobic biofilm reactor treating winery effluents and using grape stalks as biofilm carrier.

    PubMed

    Wahab, Mohamed Ali; Habouzit, Frédéric; Bernet, Nicolas; Jedidi, Naceur; Escudié, Renaud

    2016-01-01

    Wine production processes generate large amount of both winery wastewater and solid wastes. Furthermore, working periods, volumes and pollution loads greatly vary over the year. Therefore, it is recommended to develop a low-cost treatment technology for the treatment of winery effluents taking into account the variation of the organic loading rate (OLR). Accordingly, we have investigated the sequential operation of an anaerobic biofilm reactor treating winery effluents and using grape stalks (GSs) as biofilm carrier with an OLR ranging from 0.65 to 27 gCOD/L/d. The result showed that, during the start-up with wastewater influent, the chemical oxygen demand (COD) removal rate ranged from 83% to 93% and was about 91% at the end of the start-up period that lasted for 40 days. After 3 months of inactivity period of the reactor (no influent feeding), we have succeeded in restarting-up the reactor in only 15 days with a COD removal of 82% and a low concentration of volatile fatty acids (1 g/L), which confirms the robustness of the reactor. As a consequence, GSs can be used as an efficient carrier support, allowing a fast reactor start-up, while the biofilm conserves its activity during a non-feeding period. The proposed hybrid reactor thus permits to treat both winery effluents and GSs.

  18. Electricity generation of single-chamber microbial fuel cells at low temperatures.

    PubMed

    Cheng, Shaoan; Xing, Defeng; Logan, Bruce E

    2011-01-15

    Practical applications of microbial fuel cells (MFCs) for wastewater treatment will require operation of these systems over a wide range of wastewater temperatures. MFCs at room or higher temperatures (20-35°C) are relatively well studied compared those at lower temperatures. MFC performance was examined here over a temperature range of 4-30°C in terms of startup time needed for reproducible power cycles, and performance. MFCs initially operated at 15°C or higher all attained a reproducible cycles of power generation, but the startup time to reach stable operation increased from 50 h at 30°C to 210 h at 15°C. At temperatures below 15°C, MFCs did not produce appreciable power even after one month of operation. If an MFC was first started up at temperature of 30°C, however, reproducible cycles of power generation could then be achieved at even the two lowest temperatures of 4°C and 10°C. Power production increased linearly with temperature at a rate of 33±4 mW °C(-1), from 425±2 mW m(-2) at 4°C to 1260±10 mW m(-2) at 30°C. Coulombic efficiency decreased by 45% over this same temperature range, or from CE=31% at 4°C to CE=17% at 30°C. These results demonstrate that MFCs can effectively be operated over a wide range of temperatures, but our findings have important implications for the startup of larger scale reactors where low wastewater temperatures could delay or prevent adequate startup of the system. Copyright © 2010 Elsevier B.V. All rights reserved.

  19. Cold startup and low temperature performance of the Brayton cycle electrical subsystem

    NASA Technical Reports Server (NTRS)

    Vrancik, J. E.; Bainbridge, R. C.

    1971-01-01

    Cold performance tests and startup tests were conducted on the Brayton-cycle inverter, motor-driven pump, dc supply, speed control with parasitic load resistor and the Brayton control system. These tests were performed with the components in a vacuum and mounted on coldplates. A temperature range of ?25 to -50 C was used for the tests. No failures occurred, and component performance gave no indication that there would be any problem with the safe operation of the Brayton power generating system.

  20. Start-up of thermophilic-dry anaerobic digestion of OFMSW using adapted modified SEBAC inoculum.

    PubMed

    Fdéz-Güelfo, L A; Alvarez-Gallego, C; Sales Márquez, D; Romero García, L I

    2010-12-01

    The work presented here concerns the start-up and stabilization stages of a Continuous Stirred Tank Reactor (CSTR) semicontinuously fed for the treatment of the Organic Fraction of Municipal Solid Waste (OFMSW) through anaerobic digestion at thermophilic temperature range (55 degrees C) and dry conditions (30% Total Solids). The procedure reported involves two novel aspects with respect to other start-up and stabilization protocols reported in the literature. The novel aspects concern the adaptation of the inoculum to both the operating conditions (thermophilic and dry) and to the type of waste by employing a modified SEBAC (Sequential Batch Anaerobic Composting) system and, secondly, the direct start-up of the process in a thermophilic temperature regime and feeding of the system from the first day of operation. In this way a significant reduction in the start-up time and stabilization is achieved i.e. 110 days in comparison to 250 days for the processes reported by other authors for the same type of waste and digester. The system presents suitable operational conditions to stabilize the reactor at SRT of 35 days, with a maximum biogas production of 1.944 LR/L.d with a CH(4) and CO(2) percentage of 25.27% and 68.15%, respectively. 2010 Elsevier Ltd. All rights reserved.

  1. 40 CFR 63.7555 - What records must I keep?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (v) related to startup, shutdown, and malfunction. (3) Records of performance tests, fuel analyses... the deviation occurred during a period of startup, shutdown, or malfunction or during another period... monthly fuel use by each boiler or process heater, including the type(s) of fuel and amount(s) used. (2...

  2. 40 CFR 63.7555 - What records must I keep?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (v) related to startup, shutdown, and malfunction. (3) Records of performance tests, fuel analyses... the deviation occurred during a period of startup, shutdown, or malfunction or during another period... monthly fuel use by each boiler or process heater, including the type(s) of fuel and amount(s) used. (2...

  3. 40 CFR 63.345 - Provisions for new and reconstructed sources.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... completion dates of the construction or reconstruction; (vi) The anticipated date of (initial) startup of the affected source; (vii) The type of process operation to be performed (hard or decorative chromium... startup had not occurred before January 25, 1995, the notification shall be submitted as soon as...

  4. 40 CFR 63.7555 - What records must I keep?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (v) related to startup, shutdown, and malfunction. (3) Records of performance tests, fuel analyses... the deviation occurred during a period of startup, shutdown, or malfunction or during another period... monthly fuel use by each boiler or process heater, including the type(s) of fuel and amount(s) used. (2...

  5. 40 CFR 63.345 - Provisions for new and reconstructed sources.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... completion dates of the construction or reconstruction; (vi) The anticipated date of (initial) startup of the affected source; (vii) The type of process operation to be performed (hard or decorative chromium... startup had not occurred before January 25, 1995, the notification shall be submitted as soon as...

  6. 40 CFR 63.345 - Provisions for new and reconstructed sources.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... completion dates of the construction or reconstruction; (vi) The anticipated date of (initial) startup of the affected source; (vii) The type of process operation to be performed (hard or decorative chromium... startup had not occurred before January 25, 1995, the notification shall be submitted as soon as...

  7. 40 CFR 63.102 - General standards.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... in § 63.101 of this subpart), malfunction, or non-operation of the chemical manufacturing process... subpart G of this part apply. However, if a start-up, shutdown, malfunction or period of non-operation of... part during the start-up, shutdown, malfunction or period of non-operation. For example, if there is an...

  8. Startup of a Partial Nitritation-Anammox MBBR and the Implementation of pH-Based Aeration Control.

    PubMed

    Klaus, Stephanie; Baumler, Rick; Rutherford, Bob; Thesing, Glenn; Zhao, Hong; Bott, Charles

    2017-06-01

      The single-stage deammonification moving bed biofilm reactor (MBBR) is a process for treating high strength nitrogen waste streams. In this process, partial nitritation and anaerobic ammonia oxidation (anammox) occur simultaneously within a biofilm attached to plastic carriers. An existing tank at the James River Treatment Plant (76 ML/d) in Newport News, Virginia was modified to install a sidestream deammonification MBBR process. This was the second sidestream deammonification process in North America and the first MBBR type installation. After 4 months the process achieved greater than 85% ammonia removal at the design loading rate of 2.4 g /m2·d (256 kg /d) signaling the end of startup. Based on observations during startup and process optimization phases, a novel pH-based control system was developed that maximizes ammonium removal and results in stable aeration and effluent alkalinity.

  9. Experience from start-ups of the first ANITA Mox plants.

    PubMed

    Christensson, M; Ekström, S; Andersson Chan, A; Le Vaillant, E; Lemaire, R

    2013-01-01

    ANITA™ Mox is a new one-stage deammonification Moving-Bed Biofilm Reactor (MBBR) developed for partial nitrification to nitrite and autotrophic N-removal from N-rich effluents. This deammonification process offers many advantages such as dramatically reduced oxygen requirements, no chemical oxygen demand requirement, lower sludge production, no pre-treatment or requirement of chemicals and thereby being an energy and cost efficient nitrogen removal process. An innovative seeding strategy, the 'BioFarm concept', has been developed in order to decrease the start-up time of new ANITA Mox installations. New ANITA Mox installations are started with typically 3-15% of the added carriers being from the 'BioFarm', with already established anammox biofilm, the rest being new carriers. The first ANITA Mox plant, started up in 2010 at Sjölunda wastewater treatment plant (WWTP) in Malmö, Sweden, proved this seeding concept, reaching an ammonium removal rate of 1.2 kgN/m³ d and approximately 90% ammonia removal within 4 months from start-up. This first ANITA Mox plant is also the BioFarm used for forthcoming installations. Typical features of this first installation were low energy consumption, 1.5 kW/NH4-N-removed, low N₂O emissions, <1% of the reduced nitrogen and a very stable and robust process towards variations in loads and process conditions. The second ANITA Mox plant, started up at Sundets WWTP in Växjö, Sweden, reached full capacity with more than 90% ammonia removal within 2 months from start-up. By applying a nitrogen loading strategy to the reactor that matches the capacity of the seeding carriers, more than 80% nitrogen removal could be obtained throughout the start-up period.

  10. Turbine and superheater bypass evaluation. Final report. [Faster startup in cycling operation and less erosion with steam bypass systems, including bypass design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rosard, D.D.; Steltz, W.G.

    1986-10-01

    Properly sized turbine and boiler bypass systems permit two-shift cycling operation of units, shorten start-up time, and reduce life expenditures of plant components. With bypasses installed, faster startups can reduce fuel costs by $100,000 per year for a typical 500-MW fossil-fired unit. This report discusses the technical characteristics of existing bypass systems and provides guidelines for sizing bypass systems to achieve economical and reliable two-shift operation. The collection and analysis of startup data from several generating units were used in conjunction with computer simulations to illustrate the effects of adding various arrangements and sizes of steam bypass systems. The report,more » which indicates that shutdown procedures have significant impact on subsequent startup and loading time, describes operating practices to optimize the effectiveness of bypass systems. To determine the effectiveness of large turbine bypass systems of less than 100% capacity in preventing boiler trips following load rejection, transient field data were compared to a load rejection simulation using the modular modeling system (MMS). The MMS was then used to predict system response to other levels of load rejection. 7 refs., 87 figs., 8 tabs.« less

  11. PCDD/F emissions during startup and shutdown of a hazardous waste incinerator.

    PubMed

    Li, Min; Wang, Chao; Cen, Kefa; Ni, Mingjiang; Li, Xiaodong

    2017-08-01

    Compared with municipal solid waste incineration, studies on the PCDD/F emissions of hazardous waste incineration (HWI) under transient conditions are rather few. This study investigates the PCDD/F emission level, congener profile and removal efficiency recorded during startup and shutdown by collecting flue gas samples at the bag filter inlet and outlet and at the stack. The PCDD/F concentration measured in the stack gas during startup and shutdown were 0.56-4.16 ng I-TEQ Nm -3 and 1.09-3.36 ng I-TEQ Nm -3 , respectively, far exceeding the present codes in China. The total amount of PCDD/F emissions, resulting from three shutdown-startup cycles of this HWI-unit is almost equal to that generated during one year under normal operating conditions. Upstream the filter, the PCDD/F in the flue gas is mainly in the particle phase; however, after being filtered PCDD/F prevails in the gas phase. The PCDD/F fraction in the gas phase even exceeds 98% after passing through the alkaline scrubber. Especially higher chlorinated PCDD/F accumulate on inner walls of filters and ducts during these startup periods and could be released again during normal operation, significantly increasing PCDD/F emissions. Copyright © 2017. Published by Elsevier Ltd.

  12. Methyl chloride via oxyhydrochlorination of methane: A building block for chemicals and fuels from natural gas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Benson, R.L.; Brown, S.S.D.; Ferguson, S.P.

    1995-12-31

    The objectives of this program are to (a) develop a process for converting natural gas to methyl chloride via an oxyhydrochlorination route using highly selective, stable catalysts in a fixed-bed, (b) design a reactor capable of removing the large amount of heat generated in the process so as to control the reaction, (c) develop a recovery system capable of removing the methyl chloride from the product stream and (d) determine the economics and commercial viability of the process. The general approach has been as follows: (a) design and build a laboratory scale reactor, (b) define and synthesize suitable OHC catalystsmore » for evaluation, (c) select first generation OHC catalyst for Process Development Unit (PDU) trials, (d) design, construct and startup PDU, (e) evaluate packed bed reactor design, (f) optimize process, in particular, product recovery operations, (g) determine economics of process, (h) complete preliminary engineering design for Phase II and (i) make scale-up decision and formulate business plan for Phase II. Conclusions regarding process development and catalyst development are presented.« less

  13. 42 CFR 137.302 - Are Federal funds available to cover start-up costs associated with initial Tribal assumption of...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... associated with initial Tribal assumption of environmental responsibilities? 137.302 Section 137.302 Public... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Nepa Process § 137.302 Are Federal funds available to cover start-up costs associated with initial Tribal assumption of environmental...

  14. 42 CFR 137.302 - Are Federal funds available to cover start-up costs associated with initial Tribal assumption of...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... associated with initial Tribal assumption of environmental responsibilities? 137.302 Section 137.302 Public... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Nepa Process § 137.302 Are Federal funds available to cover start-up costs associated with initial Tribal assumption of environmental...

  15. 40 CFR 63.11149 - What are the standards and compliance requirements for new sources?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... on furnaces, reactors, or other types of process vessels used for the production of anode copper from... within 180 days after startup and report the results in your notification of compliance status no later... startup, shutdown, and malfunction requirements. You must comply with the requirements specified in this...

  16. Start-up and operating costs for artisan cheese companies.

    PubMed

    Bouma, Andrea; Durham, Catherine A; Meunier-Goddik, Lisbeth

    2014-01-01

    Lack of valid economic data for artisan cheese making is a serious impediment to developing a realistic business plan and obtaining financing. The objective of this study was to determine approximate start-up and operating costs for an artisan cheese company. In addition, values are provided for the required size of processing and aging facilities associated with specific production volumes. Following in-depth interviews with existing artisan cheese makers, an economic model was developed to predict costs based on input variables such as production volume, production frequency, cheese types, milk types and cost, labor expenses, and financing. Estimated values for start-up cost for processing and aging facility ranged from $267,248 to $623,874 for annual production volumes of 3,402 kg (7,500 lb) and 27,216 kg (60,000 lb), respectively. First-year production costs ranged from $65,245 to $620,094 for the above-mentioned production volumes. It is likely that high start-up and operating costs remain a significant entry barrier for artisan cheese entrepreneurs. Copyright © 2014 American Dairy Science Association. Published by Elsevier Inc. All rights reserved.

  17. Apparatus and method for thermal power generation

    DOEpatents

    Cohen, Paul; Redding, Arnold H.

    1978-01-01

    An improved thermal power plant and method of power generation which minimizes thermal stress and chemical impurity buildup in the vaporizing component, particularly beneficial under loss of normal feed fluid and startup conditions. The invention is particularly applicable to a liquid metal fast breeder reactor plant.

  18. University of Utah, Energy Commercialization Center

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thompson, James

    During the Energy Commercialization Center’s (ECC) three years in operation, the only thing constant was change. The world of commercialization and cleantech evolved significantly during the time the ECC was formed and operating, including: the availability of cleantech funding lessoned, the growth of incubators and accelerators skyrocketed, the State of Utah created an office dedicated to energy development, the University of Utah was both praised and criticized for its success in commercialization, and the Federal government temporarily shut down. During the three-year grant there were three principle investigators on the grant, as well as three directors for the University’s Commercializationmore » Office. Change can be hard for an organization,but as we instruct the companies we support, “Fail fast and fail often, because it is the fastest path to success.” Although there were some unanticipated challenges along the way, the local ecosystem is stronger because of the ECC’s efforts. Perhaps the greatest lesson learned was the importance of aligned incentives between key stakeholders in the commercialization process and the need for resources at the company and individual entrepreneur levels. The universities have systems and incentives to commercialize technologies, but creating value and companies generally rest with the individuals and entrepreneurs. Unfortunately the ECC was unable to create a viable mechanism to transfer the commercialization process that successfully aligned incentives and achieve a more effective ecosystem within the Rocky Mountain West. However, the ECC was successful in adding value to the individual ecosystems, and connecting national resources to regional and local needs. Regarding the ECC’s effectiveness in developing a cleantech commercialization ecosystem, initial inroads and relationships were established with key stakeholders. However, incentives, perceived or real competition, differences in commercialization processes, and culture all played a role in inhibiting the development and distribution of a regional ecosystem and commercialization process. Had the University and the ECC been able to develop a software platform, some of these challenges may have been overcome, but without the final development and release of the Western Innovation Network, the ECC realistically could not scale and distribute a commercialization platform. Further, cleantech startups need to engage in a more intensive customer validation process, and establish strong community connections if they are to succeed in commercializing their products. The university system incentivizes research and access to research funding and risk capital is competitive, so by nature collaboration on commercialization was difficult. Each of the local ecosystems within the Rocky Mountain West was unique. Utah did not, and does not, have a system outside of the universities to support entrepreneurs and cleantech commercialization. Through the ECC’s efforts developing a regional ecosystem, it became clear that successful ecosystems had a community and associated mechanisms that supported local entrepreneurs and startups. Most importantly the ECC aided in the creation of Utah’s cleantech ecosystem, one that supports entrepreneurs and startup companies that need help and support in their efforts to commercialize clean technologies. The absence of support for clean tech from state government and local organizations was a significant impediment to cleantech commercialization. To overcome this challenge, the ECC has formed Sustainable Startups. Sustainable Startups is a new non-profit organization designed to build a culture and community in Utah that supports and understands the importance of cleantech and sustainable development. While the ECC generated mixed success in building a regional commercialization ecosystem for cleantech, the organization did provide tremendous benefit to startups and the broader public. Over 60 companies were given direct business development support by the ECC, many of whom then generated direct economic development impacts. In addition, the ECC served an important role as community convener, educator and relationship builder through hosting numerous public and private events including: Energize 2013; Millennial Train whistle stop; business plan competition supporter; Clean Tech Open Accelerator organizer; Sustainable Startups Series developer, and much more. While the ECC did not fully apply, develop, and transmit the University of Utah’s TCO commercialization model to cleantech, it nevertheless assisted numerous inventors, entrepreneurs and institutions in furthering the growth of clean energy and energy efficiency technologies. The TCO’s commercialization model was not applied to regional clean tech initiatives for several main reasons. First, flaws with the commercialization model were realized after the ECC’s formation. Second, leadership changes within the TCO and ECC hampered early organizational development and implementation initiatives. Third, misaligned incentives between the ECC, regional universities, institutions, and the State of Utah resulted in a lack of collaboration and knowledge transfer regarding commercialization. In principle, everyone was aligned and willing to collaborate, but reality was much different and challenging.« less

  19. Block copolymer self-assembly derived ultrafiltration membranes: From science to start-up

    NASA Astrophysics Data System (ADS)

    Wiesner, Ulrich

    In the last ten years a novel method to generate asymmetric ultrafiltration membranes has been established. It is based on the combination of block copolymer self-assembly with non-solvent induced phase separation (NIPS) and is now referred to as SNIPS. NIPS as an industry proven method for the formation of phase inversion membranes opening a pathway to scale up and commercialization of these membranes. The combination of NIPS with block copolymer self-assembly leads to asymmetric membranes with narrow pore size distributions in the top surface layer (so called isoporous membranes) as well as high pore densities, thereby potentially combining high resolution with high flux in membrane separation processes. Such membranes have potential applications in the biopharmaceutical industry where a large fraction of the costs are currently associated with time-consuming non-membrane based separation processes. This talk will describe a family of isoporous ultrafiltration membranes based on the self-assembly behavior of an ABC triblock terpolymer which has led to the formation of a start-up company out of Cornell University. After introduction of the SNIPS process in general, and its application to such ABC triblock terpolymers in particular, open scientific questions associated with the formation mechanisms of the top surface separation layer in such membranes is discussed, which is at the heart of enabling high performance separation behavior. Furthermore, challenges translating scientific work into industrial settings are highlighted.

  20. Graduate Career-Making and Business Start-Up: A Literature Review

    ERIC Educational Resources Information Center

    Nabi, Ghulam; Holden, Rick; Walmsley, Andreas

    2006-01-01

    Purpose: The purpose of this article is to provide a selective review of literature on the career-related decision-making processes in terms of the transition from student to business start-up, and the nature and influence of support and guidance. Design/methodology/approach: Primarily, a critical review of a range of recently published literature…

  1. Experimental demonstration of plasma startup by coaxial helicity injection

    NASA Astrophysics Data System (ADS)

    Raman, R.; Jarboe, T. R.; Nelson, B. A.; Hamp, W. T.; Izzo, V. A.; O'Neill, R. G.; Redd, A. J.; Sieck, P. E.; Smith, R. J.

    2004-05-01

    Experimental results on the transfer of a coaxial-helicity-injection (CHI) produced discharge to inductive operation are reported. CHI assisted plasma startup is more robust than inductive only operation and reduces volt-seconds consumption. After handoff to inductive operation, the initial 100 kA of CHI produced current drops to 50 kA, then ramps up to 180 kA, using only 30 mVs, about 40% higher than that produced by induction alone. Results show that initiation of CHI discharges at lower densities produce higher levels of coupling current. Coupling a CHI produced discharge to induction from a precharged central solenoid has produced record currents of 290 kA using only 52 mWb of central solenoid flux. CHI discharges can also be generated while the central transformer is in the process of being precharged, during which period it induces a negative loop voltage on the CHI discharge. These significant results were obtained on the Helicity Injected Torus-II (HIT-II) [T.R. Jarboe, Fusion Technol. 15, 7 (1989)] spherical torus experiment (major/minor radius of 0.3/0.2 m and elongation of 1.5).

  2. Lithium D-cell study

    NASA Technical Reports Server (NTRS)

    Size, P.; Takeuchi, Esther S.

    1993-01-01

    The purpose of this contract is to evaluate parametrically the effects of various factors including the electrolyte type, electrolyte concentration, depolarizer type, and cell configuration on lithium cell electrical performance and safety. This effort shall allow for the selection and optimization of cell design for future NASA applications while maintaining close ties with WGL's continuous improvements in manufacturing processes and lithium cell design. Taguchi experimental design techniques are employed in this task, and allow for a maximum amount of information to be obtained while requiring significantly less cells than if a full factorial design were employed. Acceptance testing for this task is modeled after the NASA Document EP5-83-025, Revision C, for cell weights, OCV's and load voltages. The performance attributes that are studied in this effort are fresh capacity and start-up characteristics evaluated at two rates and two temperatures, shelf-life characteristics including start-up and capacity retention, and iterative microcalorimetry measurements. Abuse testing includes forced over discharge at two rates with and without diode protection, temperature tolerance testing, and shorting tests at three rates with the measurement of heat generated during shorting conditions.

  3. Solenoid-free plasma start-up in spherical tokamaks

    NASA Astrophysics Data System (ADS)

    Raman, R.; Shevchenko, V. F.

    2014-10-01

    The central solenoid is an intrinsic part of all present-day tokamaks and most spherical tokamaks. The spherical torus (ST) confinement concept is projected to operate at high toroidal beta and at a high fraction of the non-inductive bootstrap current as required for an efficient reactor system. The use of a conventional solenoid in a ST-based fusion nuclear facility is generally believed to not be a possibility. Solenoid-free plasma start-up is therefore an area of extensive worldwide research activity. Solenoid-free plasma start-up is also relevant to steady-state tokamak operation, as the central transformer coil of a conventional aspect ratio tokamak reactor would be located in a high radiation environment but would be needed only during the initial discharge initiation and current ramp-up phases. Solenoid-free operation also provides greater flexibility in the selection of the aspect ratio and simplifies the reactor design. Plasma start-up methods based on induction from external poloidal field coils, helicity injection and radio frequency current drive have all made substantial progress towards meeting this important need for the ST. Some of these systems will now undergo the final stages of test in a new generation of large STs, which are scheduled to begin operations during the next two years. This paper reviews research to date on methods for inducing the initial start-up current in STs without reliance on the conventional central solenoid.

  4. Implementation of an adaptive controller for the startup and steady-state running of a biomethanation process operated in the CSTR mode.

    PubMed

    Renard, P; Van Breusegem, V; Nguyen, M T; Naveau, H; Nyns, E J

    1991-10-20

    An adaptive control algorithm has been implemented on a biomethanation process to maintain propionate concentration, a stable variable, at a given low value, by steering the dilution rate. It was thereby expected to ensure the stability of the process during the startup and during steady-state running with an acceptable performance. The methane pilot reactor was operated in the completely mixed, once-through mode and computer-controlled during 161 days. The results yielded the real-life validation of the adaptive control algorithm, and documented the stability and acceptable performance expected.

  5. Design of a data-driven predictive controller for start-up process of AMT vehicles.

    PubMed

    Lu, Xiaohui; Chen, Hong; Wang, Ping; Gao, Bingzhao

    2011-12-01

    In this paper, a data-driven predictive controller is designed for the start-up process of vehicles with automated manual transmissions (AMTs). It is obtained directly from the input-output data of a driveline simulation model constructed by the commercial software AMESim. In order to obtain offset-free control for the reference input, the predictor equation is gained with incremental inputs and outputs. Because of the physical characteristics, the input and output constraints are considered explicitly in the problem formulation. The contradictory requirements of less friction losses and less driveline shock are included in the objective function. The designed controller is tested under nominal conditions and changed conditions. The simulation results show that, during the start-up process, the AMT clutch with the proposed controller works very well, and the process meets the control objectives: fast clutch lockup time, small friction losses, and the preservation of driver comfort, i.e., smooth acceleration of the vehicle. At the same time, the closed-loop system has the ability to reject uncertainties, such as the vehicle mass and road grade.

  6. The Use of a 28 GHz Gyrotron for EBW Startup Experiments on MAST

    NASA Astrophysics Data System (ADS)

    Caughman, J. B.; Bigelow, T. S.; Diem, S. J.; Peng, Y. K. M.; Rasmussen, D. A.; Shevchenko, V.; Hawes, J.; Lloyd, B.

    2009-11-01

    The use of electron Bernstein waves for non-inductive plasma current startup in MAST has recently been demonstrated [1]. The injection of 100 kW at 28 GHz generated plasma currents of up to 33 kA without the use of solenoid flux, and limited solenoid assist resulted in up to 55 kA of plasma current. A higher power 28 GHz gyrotron, with power levels of up to 300 kW for 0.5 seconds, is currently being commissioned. It is being used to investigate the scaling of startup current with microwave power and power profile as a function of time. Power modulation experiments are also being explored. Gyrotron performance and experimental results will be presented. [4pt] [1] V. Shevchenko, et al., Proceedings of the 15^th Joint Workshop on ECE and ECRH, Yosimite, USA, p. 68 (2009)

  7. A numerical analysis of high-temperature heat pipe startup from the frozen state

    NASA Technical Reports Server (NTRS)

    Cao, Y.; Faghri, A.

    1993-01-01

    Continuum and rarefied vapor flows co-exist along the heat pipe length for most of the startup period. A two-region model is proposed in which the vapor flow in the continuum region is modeled by the compressible Navier-Stokes equations, and the vapor flow in the rarefied region is simulated by a self-diffusion model. The two vapor regions are linked with appropriate boundary conditions, and heat pipe wail, wick, and vapor flow are solved as a conjugate problem. The numerical solutions for the entire heat pipe startup process from the frozen state are compared with the corresponding experimental data with good agreement.

  8. Start-up and stabilization of an Anammox process from a non-acclimatized sludge in CSTR.

    PubMed

    Bagchi, Samik; Biswas, Rima; Nandy, Tapas

    2010-09-01

    Development of an Anammox (anaerobic ammonium oxidation) process using non-acclimatized sludge requires a long start-up period owing to the very slow growth rate of Anammox bacteria. This article addresses the issue of achieving a shorter start-up period for Anammox activity in a well-mixed continuously stirred tank reactor (CSTR) using non-acclimatized anaerobic sludge. Proper selection of enrichment conditions and low stirring speed of 30 +/- 5 rpm resulted in a shorter start-up period (82 days). Activity tests revealed the microbial community structure of Anammox micro-granules. Ammonia-oxidizing bacteria (AOB) were found on the surface and on the outer most layers of granules while nitrite-oxidizing bacteria (NOB) and Anammox bacteria were present inside. Fine-tuning of influent NO2(-)/NH4+ ratio allowed Anammox activity to be maintained when mixed microbial populations were present. The maximum nitrogen removal rate achieved in the system was 0.216 kg N/(m(3) day) with a maximum specific nitrogen removal rate of 0.434 g N/(g VSS day). During the study period, Anammox activity was not inhibited by pH changes and free ammonia toxicity.

  9. [Study on the start-up of anaerobic ammonium oxidation process in biological activated carbon reactor].

    PubMed

    Lai, Wei-Yi; Zhou, Wei-Li; He, Sheng-Bing

    2013-08-01

    In order to shorten the start-up time of anaerobic ammonium oxidation (ANAMMOX) reactor, biological activated cabon reactor was applied. Three lab scale UASB reactors were seeded with anaerobic sludge, fed with synthetic wastewater containing ammonia and nitrite, and supplemented with granular activated carbon on day 0, 33 and 56, respectively. The nitrogen removal performance of the first reactor, into which GAC was added on day 0, showed no significant improvement in 90 days. After being suspended for about one month, the secondary start-up of this reactor succeeded in another 33 days (totally 123 days). 49 d and 85 d were taken for the other two reactors started up by the addition of GAC on day 33 and 56, respectively. After the reactors were started up, the average removal rates of total nitrogen were 89.8%, 86.7% and 86.7%, respectively. The start-up process could be divided into four stages, namely, the bacterial autolysis phase, the lag phase, the improve phase and the stationary phase, and the best time for adding GAC carrier was right after the start of the lag phase.

  10. Startup of reactors for anoxic ammonium oxidation: experiences from the first full-scale anammox reactor in Rotterdam.

    PubMed

    van der Star, Wouter R L; Abma, Wiebe R; Blommers, Dennis; Mulder, Jan-Willem; Tokutomi, Takaaki; Strous, Marc; Picioreanu, Cristian; van Loosdrecht, Mark C M

    2007-10-01

    The first full-scale anammox reactor in the world was started in Rotterdam (NL). The reactor was scaled-up directly from laboratory-scale to full-scale and treats up to 750 kg-N/d. In the initial phase of the startup, anammox conversions could not be identified by traditional methods, but quantitative PCR proved to be a reliable indicator for growth of the anammox population, indicating an anammox doubling time of 10-12 days. The experience gained during this first startup in combination with the availability of seed sludge from this reactor, will lead to a faster startup of anammox reactors in the future. The anammox reactor type employed in Rotterdam was compared to other reactor types for the anammox process. Reactors with a high specific surface area like the granular sludge reactor employed in Rotterdam provide the highest volumetric loading rates. Mass transfer of nitrite into the biofilm is limiting the conversion of those reactor types that have a lower specific surface area. Now the first full-scale commercial anammox reactor is in operation, a consistent and descriptive nomenclature is suggested for reactors in which the anammox process is employed.

  11. Fast Startup of Semi-Pilot-Scale Anaerobic Digestion of Food Waste Acid Hydrolysate for Biogas Production.

    PubMed

    Huang, Chao; Zhao, Cheng; Guo, Hai-Jun; Wang, Can; Luo, Mu-Tan; Xiong, Lian; Li, Hai-Long; Chen, Xue-Fang; Chen, Xin-De

    2017-12-27

    In this study, a fast startup of semi-pilot-scale anaerobic digestion of food waste acid hydrolysate for biogas production was carried out for the first time. During the period of fast startup, more than 85% of chemical oxygen demand (COD) can be degraded, and even more than 90% of COD can be degraded during the later stage of anaerobic digestion. During this anaerobic digestion process, the biogas yield, the methane yield, and the CH 4 content in biogas were 0.542 ± 0.056 m 3 /kg COD consumption , 0.442 ± 0.053 m 3 /kg COD consumption , and 81.52 ± 3.05%, respectively, and these values were high and stable. Besides, the fermentation pH was very stable, in which no acidification was observed during the anaerobic digestion process (outlet pH was 7.26 ± 0.05 for the whole anaerobic digestion). Overall, the startup of this anaerobic digestion can be completed in a short period (the system can be stable 2 days after the substrate was pumped into the bioreactor), and anaerobic digestion of food waste acid hydrolysate is feasible and attractive for industrial treatment of food waste and biogas production.

  12. Startup of air-cooled condensers and dry cooling towers at low temperatures of the cooling air

    NASA Astrophysics Data System (ADS)

    Milman, O. O.; Ptakhin, A. V.; Kondratev, A. V.; Shifrin, B. A.; Yankov, G. G.

    2016-05-01

    The problems of startup and performance of air-cooled condensers (ACC) and dry cooling towers (DCT) at low cooling air temperatures are considered. Effects of the startup of the ACC at sub-zero temperatures are described. Different options of the ACC heating up are analyzed, and examples of existing technologies are presented (electric heating, heating up with hot air or steam, and internal and external heating). The use of additional heat exchanging sections, steam tracers, in the DCT design is described. The need for high power in cases of electric heating and heating up with hot air is noted. An experimental stand for research and testing of the ACC startup at low temperatures is described. The design of the three-pass ACC unit is given, and its advantages over classical single-pass design at low temperatures are listed. The formation of ice plugs inside the heat exchanging tubes during the start-up of ACC and DCT at low cooling air temperatures is analyzed. Experimental data on the effect of the steam flow rate, steam nozzle distance from the heat-exchange surface, and their orientation in space on the metal temperature were collected, and test results are analyzed. It is noted that the surface temperature at the end of the heat up is almost independent from its initial temperature. Recommendations for the safe start-up of ACCs and DCTs are given. The heating flow necessary to sufficiently heat up heat-exchange surfaces of ACCs and DCTs for the safe startup is estimated. The technology and the process of the heat up of the ACC with the heating steam external supply are described by the example of the startup of the full-scale section of the ACC at sub-zero temperatures of the cooling air, and the advantages of the proposed start-up technology are confirmed.

  13. Investigation of Natural Circulation Instability and Transients in Passively Safe Small Modular Reactors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ishii, Mamoru

    The NEUP funded project, NEUP-3496, aims to experimentally investigate two-phase natural circulation flow instability that could occur in Small Modular Reactors (SMRs), especially for natural circulation SMRs. The objective has been achieved by systematically performing tests to study the general natural circulation instability characteristics and the natural circulation behavior under start-up or design basis accident conditions. Experimental data sets highlighting the effect of void reactivity feedback as well as the effect of power ramp-up rate and system pressure have been used to develop a comprehensive stability map. The safety analysis code, RELAP5, has been used to evaluate experimental results andmore » models. Improvements to the constitutive relations for flashing have been made in order to develop a reliable analysis tool. This research has been focusing on two generic SMR designs, i.e. a small modular Simplified Boiling Water Reactor (SBWR) like design and a small integral Pressurized Water Reactor (PWR) like design. A BWR-type natural circulation test facility was firstly built based on the three-level scaling analysis of the Purdue Novel Modular Reactor (NMR) with an electric output of 50 MWe, namely NMR-50, which represents a BWR-type SMR with a significantly reduced reactor pressure vessel (RPV) height. The experimental facility was installed with various equipment to measure thermalhydraulic parameters such as pressure, temperature, mass flow rate and void fraction. Characterization tests were performed before the startup transient tests and quasi-steady tests to determine the loop flow resistance. The control system and data acquisition system were programmed with LabVIEW to realize the realtime control and data storage. The thermal-hydraulic and nuclear coupled startup transients were performed to investigate the flow instabilities at low pressure and low power conditions for NMR-50. Two different power ramps were chosen to study the effect of startup power density on the flow instability. The experimental startup transient results showed the existence of three different flow instability mechanisms, i.e., flashing instability, condensation induced flow instability, and density wave oscillations. In addition, the void-reactivity feedback did not have significant effects on the flow instability during the startup transients for NMR-50. ii Several initial startup procedures with different power ramp rates were experimentally investigated to eliminate the flow instabilities observed from the startup transients. Particularly, the very slow startup transient and pressurized startup transient tests were performed and compared. It was found that the very slow startup transients by applying very small power density can eliminate the flashing oscillations in the single-phase natural circulation and stabilize the flow oscillations in the phase of net vapor generation. The initially pressurized startup procedure was tested to eliminate the flashing instability during the startup transients as well. The pressurized startup procedure included the initial pressurization, heat-up, and venting process. The startup transient tests showed that the pressurized startup procedure could eliminate the flow instability during the transition from single-phase flow to two-phase flow at low pressure conditions. The experimental results indicated that both startup procedures were applicable to the initial startup of NMR. However, the pressurized startup procedures might be preferred due to short operating hours required. In order to have a deeper understanding of natural circulation flow instability, the quasi-steady tests were performed using the test facility installed with preheater and subcooler. The effect of system pressure, core inlet subcooling, core power density, inlet flow resistance coefficient, and void reactivity feedback were investigated in the quasi-steady state tests. The experimental stability boundaries were determined between unstable and stable flow conditions in the dimensionless stability plane of inlet subcooling number and Zuber number. To predict the stability boundary theoretically, linear stability analysis in the frequency domain was performed at four sections of the natural circulation test loop. The flashing phenomena in the chimney section was considered as an axially uniform heat source. And the dimensionless characteristic equation of the pressure drop perturbation was obtained by considering the void fraction effect and outlet flow resistance in the core section. The theoretical flashing boundary showed some discrepancies with previous experimental data from the quasi-steady state tests. In the future, thermal non-equilibrium was recommended to improve the accuracy of flashing instability boundary. As another part of the funded research, flow instabilities of a PWR-type SMR under low pressure and low power conditions were investigated experimentally as well. The NuScale reactor design was selected as the prototype for the PWR-type SMR. In order to experimentally study the natural circulation behavior of NuScale iii reactor during accidental scenarios, detailed scaling analyses are necessary to ensure that the scaled phenomena could be obtained in a laboratory test facility. The three-level scaling method is used as well to obtain the scaling ratios derived from various non-dimensional numbers. The design of the ideally scaled facility (ISF) was initially accomplished based on these scaling ratios. Then the engineering scaled facility (ESF) was designed and constructed based on the ISF by considering engineering limitations including laboratory space, pipe size, and pipe connections etc. PWR-type SMR experiments were performed in this well-scaled test facility to investigate the potential thermal hydraulic flow instability during the blowdown events, which might occur during the loss of coolant accident (LOCA) and loss of heat sink accident (LOHS) of the prototype PWR-type SMR. Two kinds of experiments, normal blowdown event and cold blowdown event, were experimentally investigated and compared with code predictions. The normal blowdown event was experimentally simulated since an initial condition where the pressure was lower than the designed pressure of the experiment facility, while the code prediction of blowdown started from the normal operation condition. Important thermal hydraulic parameters including reactor pressure vessel (RPV) pressure, containment pressure, local void fraction and temperature, pressure drop and natural circulation flow rate were measured and analyzed during the blowdown event. The pressure and water level transients are similar to the experimental results published by NuScale [51], which proves the capability of current loop in simulating the thermal hydraulic transient of real PWR-type SMR. During the 20000s blowdown experiment, water level in the core was always above the active fuel assemble during the experiment and proved the safety of natural circulation cooling and water recycling design of PWR-type SMR. Besides, pressure, temperature, and water level transient can be accurately predicted by RELAP5 code. However, the oscillations of natural circulation flow rate, water level and pressure drops were observed during the blowdown transients. This kind of flow oscillations are related to the water level and the location upper plenum, which is a path for coolant flow from chimney to steam generator and down comer. In order to investigate the transients start from the opening of ADS valve in both experimental and numerical way, the cold blow-down experiment is conducted. For the cold blowdown event, different from setting both reactor iv pressure vessel (RPV) and containment at high temperature and pressure, only RPV was heated close to the highest designed pressure and then open the ADS valve, same process was predicted using RELAP5 code. By doing cold blowdown experiment, the entire transients from the opening of ADS can be investigated by code and benchmarked with experimental data. Similar flow instability observed in the cold blowdown experiment. The comparison between code prediction and experiment data showed that the RELAP5 code can successfully predict the pressure void fraction and temperature transient during the cold blowdown event with limited error, but numerical instability exists in predicting natural circulation flow rate. Besides, the code is lack of capability in predicting the water level related flow instability observed in experiments.« less

  14. Rapid Generation of Superheated Steam Using a Water-containing Porous Material

    NASA Astrophysics Data System (ADS)

    Mori, Shoji; Okuyama, Kunito

    Heat treatment by superheated steam has been utilized in several industrial fields including sterilization, desiccation, and cooking. In particular, cooking by superheated steam is receiving increased attention because it has advantages of reducing the salt and fat contents in foods as well as suppressing the oxidation of vitamin C and fat. In this application, quick startup and cut-off responses are required. Most electrically energized steam generators require a relatively long time to generate superheated steam due to the large heat capacities of the water in container and of the heater. Zhao and Liao (2002) introduced a novel process for rapid vaporization of subcooled liquid, in which a low-thermal-conductivity porous wick containing water is heated by a downward-facing grooved heating block in contact with the upper surface of the wick structure. They showed that saturated steam is generated within approximately 30 seconds from room-temperature water at a heat flux 41.2 kW⁄m2. In order to quickly generate superheated steam of approximately 300°C, which is required for cooking, the heat capacity of the heater should be as small as possible and the imposed heat flux should be so high enough that the porous wick is able to dry out in the vicinity of the contact with the heater and that the resulting heater temperature becomes much higher than the saturation temperature. The present paper proposes a simple structured generator to quickly produce superheated steam. Only a fine wire heater is contacted spirally on the inside wall in a hollow porous material. The start-up, cut-off responses and the rate of energy conversion for input power are investigated experimentally. Superheated steam of 300°C is produced in approximately 19 seconds from room-temperature water for an input power of 300 W. The maximum rate of energy conversion in the steady state is approximately 0.9.

  15. Performance evaluation of startup for a yeast membrane bioreactor (MBRy) treating landfill leachate.

    PubMed

    Amaral, Míriam C S; Gomes, Rosimeire F; Brasil, Yara L; Oliveira, Sílvia M A; Moravia, Wagner G

    2017-12-06

    The startup process of a membrane bioreactor inoculated with yeast biomass (Saccharomyces cerevisiae) and used in the treatment of landfill leachate was evaluated. The yeast membrane bioreactor (MBRy) was inoculated with an exogenous inoculum, a granulated active dry commercial bakers' yeast. The MBRy was successfully started up with a progressive increase in the landfill leachate percentage in the MBRy feed and the use of Sabouraud Dextrose Broth. The membrane plays an important role in the startup phase because of its full biomass retention and removal of organic matter. MBRy is a suitable and promising process to treat recalcitrant landfill leachate. After the acclimation period, the COD and NH 3 removal efficiency reached values of 72 ± 3% and 39 ± 2% respectively. MBRy shows a low membrane-fouling potential. The membrane fouling was influenced by soluble microbial products, extracellular polymeric substances, sludge particle size, and colloidal dissolved organic carbon.

  16. Reconstruction of recycling flux from synthetic camera images, evaluated for the Wendelstein 7-X startup limiter

    NASA Astrophysics Data System (ADS)

    Frerichs, H.; Effenberg, F.; Feng, Y.; Schmitz, O.; Stephey, L.; Reiter, D.; Börner, P.; The W7-X Team

    2017-12-01

    The interpretation of spectroscopic measurements in the edge region of high-temperature plasmas can be guided by modeling with the EMC3-EIRENE code. A versatile synthetic diagnostic module, initially developed for the generation of synthetic camera images, has been extended for the evaluation of the inverse problem in which the observable photon flux is related back to the originating particle flux (recycling). An application of this synthetic diagnostic to the startup phase (inboard) limiter in Wendelstein 7-X (W7-X) is presented, and reconstruction of recycling from synthetic observation of \\renewcommand{\

  17. In-situ analysis of hydrazine decomposition products

    NASA Technical Reports Server (NTRS)

    Curran, Francis M.; Whalen, Margaret V.

    1987-01-01

    A gas analyzer utilizing a nondispersive infrared (NDIR) detection system was used to monitor the ammonia and water vapor content of the products of a previously unused hydrazine gas generator. This provided an in-situ measurement of the generator's efficiency difficult to obtain by other means. The analyzer was easily installed in both the calibration and hydrazine systems, required no maintenance other than periodic zero adjustments, and performed well for extended periods in the operating range tested. The catalyst bed operated smoothly and repeatably during the 28 hr of testing. No major transients were observed on startup or during steady state operation. The amount of ammonia in the output stream of the gas generator was found to be a strong function of temperature at catalyst bed temperatures below 450 C. At temperatures above this, the efficiency remained nearly constant. On startup the gas generator efficiency was found to decrease with time until a steady state value was attained. Elevated catalyst bed temperatures in the periods before steady state operation was found to be responsible for this phenomenon.

  18. Is it possible to design a portable power generator based on micro-solid oxide fuel cells? A finite volume analysis

    NASA Astrophysics Data System (ADS)

    Pla, D.; Sánchez-González, A.; Garbayo, I.; Salleras, M.; Morata, A.; Tarancón, A.

    2015-10-01

    The inherent limited capacity of current battery technology is not sufficient for covering the increasing power requirements of widely extended portable devices. Among other promising alternatives, recent advances in the field of micro-Solid Oxide Fuel Cells (μ-SOFCs) converted this disruptive technology into a serious candidate to power next generations of portable devices. However, the implementation of single cells in real devices, i.e. μ-SOFC stacks coupled to the required balance-of-plant elements like fuel reformers or post combustors, still remains unexplored. This work aims addressing this system-level research by proposing a new compact design of a vertically stacked device fuelled with ethanol. The feasibility and design optimization for achieving a thermally self-sustained regime and a rapid and low-power consuming start-up is studied by finite volume analysis. An optimal thermal insulation strategy is defined to maintain the steady-state operation temperature of the μ-SOFC at 973 K and an external temperature lower than 323 K. A hybrid start-up procedure, based on heaters embedded in the μ-SOFCs and heat released by chemical reactions in the post-combustion unit, is analyzed allowing start-up times below 1 min and energy consumption under 500 J. These results clearly demonstrate the feasibility of high temperature μ-SOFC power systems fuelled with hydrocarbons for portable applications, therefore, anticipating a new family of mobile and uninterrupted power generators.

  19. DISP: Optimizations towards Scalable MPI Startup

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fu, Huansong; Pophale, Swaroop S; Gorentla Venkata, Manjunath

    2016-01-01

    Despite the popularity of MPI for high performance computing, the startup of MPI programs faces a scalability challenge as both the execution time and memory consumption increase drastically at scale. We have examined this problem using the collective modules of Cheetah and Tuned in Open MPI as representative implementations. Previous improvements for collectives have focused on algorithmic advances and hardware off-load. In this paper, we examine the startup cost of the collective module within a communicator and explore various techniques to improve its efficiency and scalability. Accordingly, we have developed a new scalable startup scheme with three internal techniques, namelymore » Delayed Initialization, Module Sharing and Prediction-based Topology Setup (DISP). Our DISP scheme greatly benefits the collective initialization of the Cheetah module. At the same time, it helps boost the performance of non-collective initialization in the Tuned module. We evaluate the performance of our implementation on Titan supercomputer at ORNL with up to 4096 processes. The results show that our delayed initialization can speed up the startup of Tuned and Cheetah by an average of 32.0% and 29.2%, respectively, our module sharing can reduce the memory consumption of Tuned and Cheetah by up to 24.1% and 83.5%, respectively, and our prediction-based topology setup can speed up the startup of Cheetah by up to 80%.« less

  20. Micro-tubular flame-assisted fuel cells for micro-combined heat and power systems

    NASA Astrophysics Data System (ADS)

    Milcarek, Ryan J.; Wang, Kang; Falkenstein-Smith, Ryan L.; Ahn, Jeongmin

    2016-02-01

    Currently the role of fuel cells in future power generation is being examined, tested and discussed. However, implementing systems is more difficult because of sealing challenges, slow start-up and complex thermal management and fuel processing. A novel furnace system with a flame-assisted fuel cell is proposed that combines the thermal management and fuel processing systems by utilizing fuel-rich combustion. In addition, the flame-assisted fuel cell furnace is a micro-combined heat and power system, which can produce electricity for homes or businesses, providing resilience during power disruption while still providing heat. A micro-tubular solid oxide fuel cell achieves a significant performance of 430 mW cm-2 operating in a model fuel-rich exhaust stream.

  1. Two-dimensional simulation of a two-phase, regenerative pumped radiator loop utilizing direct contact heat transfer with phase change

    NASA Astrophysics Data System (ADS)

    Rhee, Hyop S.; Begg, Lester L.; Wetch, Joseph R.; Jang, Jong H.; Juhasz, Albert J.

    An innovative pumped loop concept for 600 K space power system radiators utilizing direct contact heat transfer, which facilitates repeated startup/shutdown of the power system without complex and time-consuming coolant thawing during power startup, is under development. The heat transfer process with melting/freezing of Li in an NaK flow was studied through two-dimensional time-dependent numerical simulations to characterize and predict the Li/NaK radiator performance during startup (thawing) and shutdown (cold-trapping). Effects of system parameters and the criteria for the plugging domain are presented together with temperature distribution patterns in solid Li and subsequent melting surface profile variations in time.

  2. Ammonia biofiltration and nitrous oxide generation during the start-up of gas-phase compost biofilters

    NASA Astrophysics Data System (ADS)

    Maia, Guilherme D. N.; Day V, George B.; Gates, Richard S.; Taraba, Joseph L.

    2012-01-01

    Gas-Phase Biofiltration technology is widely utilized for treating ammonia gas (NH 3) with one of its potential detrimental by-products being nitrous oxide (N 2O), a potent greenhouse gas (100-y radiative forcing 298 times greater than carbon dioxide). The present work was conducted to investigate the relation between NH 3 removal during biofiltration and N 2O generation as a product of incomplete denitrification during the start-up of gas-phase compost biofilters. Four laboratory scale tubular biofilters in up flow mode (20 s residence-time) were studied for 21 days: 3 replicates were subjected to 16 ppm v (0.78 g m -2 h -1) of NH 3 and a statistical control not subjected to NH 3. Ammonia concentration differences between biofilter inlet (Bottom = 16 ppm v) and outlet (Top) and N 2O concentration differences between biofilter outlet (Top) and biofilter inlet (background concentrations at the bottom) were used to determine the extent of the correlation between NH 3 removal and N 2O generation. Correlations with CH 4 and CO 2 were also reported. The high Spearman correlation coefficients for the three replicates ( ρ = -0.845, -0.820, and -0.841, with P ≤ 0.0001 for replications A, B and C, respectively) suggested that availability of nitrate/nitrite owing to NH 3 nitrification favored conditions for N 2O generation as a sub-product of denitrification. The statistical control received no NH 3 inputs and did not generate N 2O. Therefore, the results indicated that the process of NH 3 removal was a trigger for N 2O production. Carbon dioxide and N 2O were moderately correlated. Methane and N 2O were weakly correlated and only for replicate C. No significant correlation was found for the Statistical Control between N 2O and CH 4.

  3. Saccharomyces cerevisiae strains for second-generation ethanol production: from academic exploration to industrial implementation.

    PubMed

    Jansen, Mickel L A; Bracher, Jasmine M; Papapetridis, Ioannis; Verhoeven, Maarten D; de Bruijn, Hans; de Waal, Paul P; van Maris, Antonius J A; Klaassen, Paul; Pronk, Jack T

    2017-08-01

    The recent start-up of several full-scale 'second generation' ethanol plants marks a major milestone in the development of Saccharomyces cerevisiae strains for fermentation of lignocellulosic hydrolysates of agricultural residues and energy crops. After a discussion of the challenges that these novel industrial contexts impose on yeast strains, this minireview describes key metabolic engineering strategies that have been developed to address these challenges. Additionally, it outlines how proof-of-concept studies, often developed in academic settings, can be used for the development of robust strain platforms that meet the requirements for industrial application. Fermentation performance of current engineered industrial S. cerevisiae strains is no longer a bottleneck in efforts to achieve the projected outputs of the first large-scale second-generation ethanol plants. Academic and industrial yeast research will continue to strengthen the economic value position of second-generation ethanol production by further improving fermentation kinetics, product yield and cellular robustness under process conditions. © FEMS 2017.

  4. Use of the Marshall Space Flight Center solar simulator in collector performance evaluation

    NASA Technical Reports Server (NTRS)

    Humphries, W. R.

    1978-01-01

    Actual measured values from simulator checkout tests are detailed. Problems encountered during initial startup are discussed and solutions described. Techniques utilized to evaluate collector performance from simulator test data are given. Performance data generated in the simulator are compared to equivalent data generated during natural outdoor testing. Finally, a summary of collector performance parameters generated to date as a result of simulator testing are given.

  5. [Quick Start-up and Sustaining of Shortcut Nitrification in Continuous Flow Reactor].

    PubMed

    Wu, Peng; Zhang Shi-ying; Song, Yin-ling; Xu, Yue-zhong; Shen, Yao-liang

    2016-04-15

    How to achieve fast and stable startup of shortcut nitrification has a very important practical value for treatment of low C/N ratio wastewater. Thus, the quick start-up and sustaining of shortcut nitrification were investigated in continuous flow reactor targeting at the current situation of urban wastewater treatment plant using a continuous flow process. The results showed that quick start-up of shortcut nitrification could be successfully achieved in a continuous flow reactor after 60 days' operation with intermittent aeration and controlling of three stages of stop/aeration time (15 min/45 min, 45 min/45 min and 30 min/30 min). The nitrification rates could reach 90% or 95% respectively, while influent ammonia concentrations were 50 or 100 mg · L⁻¹ with stop/aeration time of 30 min/30 min. In addition, intermittent aeration could inhibit the activity of nitrite oxidizing bacteria (NOB), while short hydraulic retention time (HRT) may wash out NOB. And a combined use of both measures was beneficial to sustain shortcut nitrification.

  6. High-temperature catalyst for catalytic combustion and decomposition

    NASA Technical Reports Server (NTRS)

    Mays, Jeffrey A. (Inventor); Lohner, Kevin A. (Inventor); Sevener, Kathleen M. (Inventor); Jensen, Jeff J. (Inventor)

    2005-01-01

    A robust, high temperature mixed metal oxide catalyst for propellant composition, including high concentration hydrogen peroxide, and catalytic combustion, including methane air mixtures. The uses include target, space, and on-orbit propulsion systems and low-emission terrestrial power and gas generation. The catalyst system requires no special preheat apparatus or special sequencing to meet start-up requirements, enabling a fast overall response time. Start-up transients of less than 1 second have been demonstrated with catalyst bed and propellant temperatures as low as 50 degrees Fahrenheit. The catalyst system has consistently demonstrated high decomposition effeciency, extremely low decomposition roughness, and long operating life on multiple test particles.

  7. Investigation of natural circulation instability and transients in passively safe novel modular reactor

    NASA Astrophysics Data System (ADS)

    Shi, Shanbin

    The Purdue Novel Modular Reactor (NMR) is a new type small modular reactor (SMR) that belongs to the design of boiling water reactor (BWR). Specifically, the NMR is one third the height and area of a conventional BWR reactor pressure vessel (RPV) with an electric output of 50 MWe. The fuel cycle length of the NMR-50 is extended up to 10 years due to optimized neutronics design. The NMR-50 is designed with double passive engineering safety system. However, natural circulation BWRs (NCBWR) could experience certain operational difficulties due to flow instabilities that occur at low pressure and low power conditions. Static instabilities (i.e. flow excursion (Ledinegg) instability and flow pattern transition instability) and dynamic instabilities (i.e. density wave instability and flashing/condensation instability) pose a significant challenge in two-phase natural circulation systems. In order to experimentally study the natural circulation flow instability, a proper scaling methodology is needed to build a reduced-size test facility. The scaling analysis of the NMR uses a three-level scaling method, which was developed and applied for the design of the Purdue Multi-dimensional Integral Test Assembly (PUMA). Scaling criteria is derived from dimensionless field equations and constitutive equations. The scaling process is validated by the RELAP5 analysis for both steady state and startup transients. A new well-scaled natural circulation test facility is designed and constructed based on the scaling analysis of the NMR-50. The experimental facility is installed with different equipment to measure various thermal-hydraulic parameters such as pressure, temperature, mass flow rate and void fraction. Characterization tests are performed before the startup transient tests and quasi-steady tests to determine the loop flow resistance. The controlling system and data acquisition system are programmed with LabVIEW to realize the real-time control and data storage. The thermal-hydraulic and nuclear coupled startup transients are performed to investigate the flow instabilities at low pressure and low power conditions. Two different power ramps are chosen to study the effect of power density on the flow instability. The experimental startup transient tests show the existence of three different flow instability mechanisms during the low pressure startup transients, i.e., flashing instability, condensation induced instability, and density wave oscillations. Flashing instability in the chimney section of the test loop and density wave oscillation are the main flow instabilities observed when the system pressure is below 0.5 MPa. They show completely different type of oscillations, i.e., intermittent oscillation and sinusoidal oscillation, in void fraction profile during the startup transients. In order to perform nuclear-coupled startup transients with void reactivity feedback, the Point Kinetics model is utilized to calculate the transient power during the startup transients. In addition, the differences between the electric resistance heaters and typical fuel element are taken into account. The reactor power calculated shows some oscillations due to flashing instability during the transients. However, the void reactivity feedback does not have significant influence on the flow instability during the startup procedure for the NMR-50. Further investigation of very small power ramp on the startup transients is carried out for the thermal-hydraulic startup transients. It is found that very small power density can eliminate the flashing oscillation in the single phase natural circulation and stabilize the flow oscillations in the phase of net vapor generation. Furthermore, initially pressurized startup procedure is investigated to eliminate the main flow instabilities. The results show that the pressurized startup procedure can suppress the flashing instability at low pressure and low power conditions. In order to have a deep understanding of natural circulation flow instability, the quasi-steady tests are performed using the test facility installed with preheater and subcooler. The effects of system pressure, core inlet subcooling, core power density, inlet flow resistance coefficient, and void reactivity feedback are investigated in the quasi-steady state tests. The stability boundaries are determined between unstable and stable flow conditions in the dimensionless stability plane of inlet subcooling number and Zuber number. In order to predict the stability boundary theoretically, linear stability analysis in the frequency domain is performed at four sections of the loop. The flashing in the chimney is considered as an axially uniform heat source. The dimensionless characteristic equation of the pressure drop perturbation is obtained by considering the void fraction effect and outlet flow resistance in the chimney section. The flashing boundary shows some discrepancies with previous experimental data from the quasi-steady state tests. In the future, thermal non-equilibrium is recommended to improve the accuracy of flashing instability boundary.

  8. Study on Self-start up of Polymer Electrolyte Fuel Cell Stack at Subzero Temperature

    NASA Astrophysics Data System (ADS)

    Shirato, Hiroyasu; Hoshina, Hideo; Yamakoshi, Yukiyasu; Tomita, Kazuhiko; Oka, Yoshiaki

    This paper aims to boot up polymer electrolyte fuel cells at subzero temperature without energy from outside and compass the conditions. Visualization tests of water drainage and voltage-current density characteristics provided the selection of a serpentine type as a channel of a fuel cell separator for cold region. The successful start-up of the cell at subzero temperature requires suitable current densities corresponding to the ambient temperature since the lower the temperature is, the lower the cell voltage soon after the start-up is. Suitable amount of exhausted energy is also necessary for the successful self start-up. Humidification using potassium acetate 30 mass% solution provides increased impedance of the cell and inhibits the water freezing owing to its dispersal to the electrode compared to no humidification. A stack laminated 25 sheets of the serpentine type separators enables stabilized power generation at normal temperature. The stack is also bootable with no energy from outside at 263K.

  9. Hydrogen-rich gas generator

    NASA Technical Reports Server (NTRS)

    Houseman, J.; Cerini, D. J. (Inventor)

    1976-01-01

    A process and apparatus are described for producing hydrogen-rich product gases. A spray of liquid hydrocarbon is mixed with a stream of air in a startup procedure and the mixture is ignited for partial oxidation. The stream of air is then heated by the resulting combustion to reach a temperature such that a signal is produced. The signal triggers a two way valve which directs liquid hydrocarbon from a spraying mechanism to a vaporizing mechanism with which a vaporized hydrocarbon is formed. The vaporized hydrocarbon is subsequently mixed with the heated air in the combustion chamber where partial oxidation takes place and hydrogen-rich product gases are produced.

  10. Advanced air revitalization system testing

    NASA Technical Reports Server (NTRS)

    Heppner, D. B.; Hallick, T. M.; Schubert, F. H.

    1983-01-01

    A previously developed experimental air revitalization system was tested cyclically and parametrically. One-button startup without manual interventions; extension by 1350 hours of tests with the system; capability for varying process air carbon dioxide partial pressure and humidity and coolant source for simulation of realistic space vehicle interfaces; dynamic system performance response on the interaction of the electrochemical depolarized carbon dioxide concentrator, the Sabatier carbon dioxide reduction subsystem, and the static feed water electrolysis oxygen generation subsystem, the carbon dioxide concentrator module with unitized core technology for the liquid cooled cell; and a preliminary design for a regenerative air revitalization system for the space station are discussed.

  11. A Numerical Investigation of the Startup Transient in a Wave Rotor

    NASA Technical Reports Server (NTRS)

    Paxson, Daniel E.

    1996-01-01

    The startup process is investigated for a hypothetical four-port wave rotor, envisioned as a topping cycle for a small gas turbine engine. The investigation is conducted numerically using a multi-passage, one-dimensional CFD-based wave rotor simulation in combination with lumped volume models for the combustor, exhaust valve plenum, and rotor center cavity components. The simulation is described and several startup transients are presented which illustrate potential difficulties for the specific cycle design investigated. In particular it is observed that, prior to combustor light-off, or just after, the flow through the combustor loop is reversed from the design direction. The phenomenon is demonstrated and several possible modifications techniques are discussed which avoid or overcome the problem.

  12. Research for the Fluid Field of the Centrifugal Compressor Impeller in Accelerating Startup

    NASA Astrophysics Data System (ADS)

    Li, Xiaozhu; Chen, Gang; Zhu, Changyun; Qin, Guoliang

    2013-03-01

    In order to study the flow field in the impeller in the accelerating start-up process of centrifugal compressor, the 3-D and 1-D transient accelerated flow governing equations along streamline in the impeller of the centrifugal compressor are derived in detail, the assumption of pressure gradient distribution is presented, and the solving method for 1-D transient accelerating flow field is given based on the assumption. The solving method is achieved by programming and the computing result is obtained. It is obtained by comparison that the computing method is met with the test result. So the feasibility and effectiveness for solving accelerating start-up problem of centrifugal compressor by the solving method in this paper is proven.

  13. [Outsourcing in long-term care: a risk management approach].

    PubMed

    Guimarães, Cristina Machado; Carvalho, José Crespo de

    2012-05-01

    This article seeks to investigate outsourcing decisions in supply chain management of healthcare organizations, namely the motives and constraints behind the decision, the selection criteria for activities to be outsourced to third parties, the type of possible agreements, and the impact of this decision on the organization per se. A case study of the start-up phase of a Long-term Care unit with an innovative approach and high levels of customization was conducted to understand the outsourcing process in a start-up context (not in the standard context of organizational change) and a risk evaluation matrix was created for outsourcing activities in order to define and implement a performance monitoring process. This study seeks to understand how to evaluate and assess the risks of an outsourcing strategy and proposes a monitoring model using risk management tools. It was shown that the risk management approach can be a solution for monitoring outsourcing in the organizational start-up phase. Conclusions concerning dissatisfaction with the results of outsourcing strategies adopted are also presented.

  14. Optimization of startup and shutdown operation of simulated moving bed chromatographic processes.

    PubMed

    Li, Suzhou; Kawajiri, Yoshiaki; Raisch, Jörg; Seidel-Morgenstern, Andreas

    2011-06-24

    This paper presents new multistage optimal startup and shutdown strategies for simulated moving bed (SMB) chromatographic processes. The proposed concept allows to adjust transient operating conditions stage-wise, and provides capability to improve transient performance and to fulfill product quality specifications simultaneously. A specially tailored decomposition algorithm is developed to ensure computational tractability of the resulting dynamic optimization problems. By examining the transient operation of a literature separation example characterized by nonlinear competitive isotherm, the feasibility of the solution approach is demonstrated, and the performance of the conventional and multistage optimal transient regimes is evaluated systematically. The quantitative results clearly show that the optimal operating policies not only allow to significantly reduce both duration of the transient phase and desorbent consumption, but also enable on-spec production even during startup and shutdown periods. With the aid of the developed transient procedures, short-term separation campaigns with small batch sizes can be performed more flexibly and efficiently by SMB chromatography. Copyright © 2011 Elsevier B.V. All rights reserved.

  15. Design and start-up of Gary Works' pulverized coal injection facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    O'Donnell, E.M.; Cloran, L.M.; Oshnock, T.W.

    1993-07-01

    A pulverized coal injection system began operation at the Gary works' blast furnaces on Feb. 1, 1993. This system is capable of processing more than 3500 tons of coal/day to eventually supply the furnaces at a 400 lb/NTHM rate. The start-up was aggressive with coal levels exceeding 200 lb/NTHM within two to five weeks on the furnaces. Current rates are in the 250 to 290 lb/NTHM range.

  16. A summary of sodium-cooled fast reactor development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Aoto, Kazumi; Dufour, Philippe; Hongyi, Yang

    Much of the basic technology for the Sodium-cooled fast Reactor (SFR) has been established through long term development experience with former fast reactor programs, and is being confirmed by the Phénix end-of-life tests in France, the restart of Monju in Japan, the lifetime extension of BN-600 in Russia, and the startup of the China Experimental Fast Reactor in China. Planned startup in 2014 for new SFRs: BN-800 in Russia and PFBR in India, will further enhance the confirmation of the SFR basic technology. Nowadays, the SFR development has advanced to aiming at establishment of the Generation-IV system which is dedicatedmore » to sustainable energy generation and actinide management, and several advanced SFR concepts are under development such as PRISM, JSFR, ASTRID, PGSFR, BN-1200, and CFR-600. Generation-IV International Forum is an international collaboration framework where various R&D activities are progressing on design of system and component, safety and operation, advanced fuel, and actinide cycle for the Generation-IV SFR development, and will play a beneficial role of promoting them thorough providing an opportunity to share the past experience and the latest data of design and R&D among countries developing SFR.« less

  17. On the breakdown modes and parameter space of Ohmic Tokamak startup

    NASA Astrophysics Data System (ADS)

    Peng, Yanli; Jiang, Wei; Zhang, Ya; Hu, Xiwei; Zhuang, Ge; Innocenti, Maria; Lapenta, Giovanni

    2017-10-01

    Tokamak plasma has to be hot. The process of turning the initial dilute neutral hydrogen gas at room temperature into fully ionized plasma is called tokamak startup. Even with over 40 years of research, the parameter ranges for the successful startup still aren't determined by numerical simulations but by trial and errors. However, in recent years it has drawn much attention due to one of the challenges faced by ITER: the maximum electric field for startup can't exceed 0.3 V/m, which makes the parameter range for successful startup narrower. Besides, this physical mechanism is far from being understood either theoretically or numerically. In this work, we have simulated the plasma breakdown phase driven by pure Ohmic heating using a particle-in-cell/Monte Carlo code, with the aim of giving a predictive parameter range for most tokamaks, even for ITER. We have found three situations during the discharge, as a function of the initial parameters: no breakdown, breakdown and runaway. Moreover, breakdown delay and volt-second consumption under different initial conditions are evaluated. In addition, we have simulated breakdown on ITER and confirmed that when the electric field is 0.3 V/m, the optimal pre-filling pressure is 0.001 Pa, which is in good agreement with ITER's design.

  18. Loop Heat Pipe Startup Behaviors

    NASA Technical Reports Server (NTRS)

    Ku, Jentung

    2016-01-01

    A loop heat pipe must start successfully before it can commence its service. The startup transient represents one of the most complex phenomena in the loop heat pipe operation. This paper discusses various aspects of loop heat pipe startup behaviors. Topics include the four startup scenarios, the initial fluid distribution between the evaporator and reservoir that determines the startup scenario, factors that affect the fluid distribution between the evaporator and reservoir, difficulties encountered during the low power startup, and methods to enhance the startup success. Also addressed are the pressure spike and pressure surge during the startup transient, and repeated cycles of loop startup and shutdown under certain conditions.

  19. Bioelectrochemical desalination and electricity generation in microbial desalination cell with dewatered sludge as fuel.

    PubMed

    Meng, Fanyu; Jiang, Junqiu; Zhao, Qingliang; Wang, Kun; Zhang, Guodong; Fan, Qingxin; Wei, Liangliang; Ding, Jing; Zheng, Zhen

    2014-04-01

    Microbial desalination cells (MDCs) with common liquid anodic substrate exhibit a slow startup and destructive pH drop, and abiotic cathodes have high cost and low sustainability. A biocathode MDC with dewatered sludge as fuel was developed for synergistic desalination, electricity generation and sludge stabilization. Experimental results indicated that the startup period was reduced to 3d, anodic pH was maintained between 6.6 and 7.6, and high stability was shown under long-term operation (300d). When initial NaCl concentrations were 5 and 10g/L, the desalinization rates during stable operation were 46.37±1.14% and 40.74±0.89%, respectively. The maximum power output of 3.178W/m(3) with open circuit voltage (OCV) of 1.118V was produced on 130d. After 300d, 25.71±0.15% of organic matter was removed. These results demonstrated that dewatered sludge was an appropriate anodic substrate to enhance MDC stability for desalination and electricity generation. Copyright © 2014 Elsevier Ltd. All rights reserved.

  20. Rich-burn, flame-assisted fuel cell, quick-mix, lean-burn (RFQL) combustor and power generation

    NASA Astrophysics Data System (ADS)

    Milcarek, Ryan J.; Ahn, Jeongmin

    2018-03-01

    Micro-tubular flame-assisted fuel cells (mT-FFC) were recently proposed as a modified version of the direct flame fuel cell (DFFC) operating in a dual chamber configuration. In this work, a rich-burn, quick-mix, lean-burn (RQL) combustor is combined with a micro-tubular solid oxide fuel cell (mT-SOFC) stack to create a rich-burn, flame-assisted fuel cell, quick-mix, lean-burn (RFQL) combustor and power generation system. The system is tested for rapid startup and achieves peak power densities after only 35 min of testing. The mT-FFC power density and voltage are affected by changes in the fuel-lean and fuel-rich combustion equivalence ratio. Optimal mT-FFC performance favors high fuel-rich equivalence ratios and a fuel-lean combustion equivalence ratio around 0.80. The electrical efficiency increases by 150% by using an intermediate temperature cathode material and improving the insulation. The RFQL combustor and power generation system achieves rapid startup, a simplified balance of plant and may have applications for reduced NOx formation and combined heat and power.

  1. Establishment of thermophilic anaerobic terephthalic acid degradation system through one-step temperature increase startup strategy - Revealed by Illumina Miseq Sequencing.

    PubMed

    Ma, Kai-Li; Li, Xiang-Kun; Wang, Ke; Meng, Ling-Wei; Liu, Gai-Ge; Zhang, Jie

    2017-10-01

    Over recent years, thermophilic digestion was constantly focused owing to its various advantage over mesophilic digestion. Notably, the startup approach of thermophilic digester needs to be seriously considered as unsuitable startup ways may result in system inefficiency. In this study, one-step temperature increase startup strategy from 37 °C to 55 °C was applied to establish a thermophilic anaerobic system treating terephthalic acid (TA) contained wastewater, meanwhile, the archaeal and bacterial community compositions at steady periods of 37 °C and 55 °C during the experimental process was also compared using Illumina Miseq Sequencing. The process operation demonstrated that the thermophilic TA degradation system was successfully established at 55 °C with over 95% COD reduction. For archaea community, the elevation of operational temperature from 37 °C to 55 °C accordingly increase the enrichment of hydrogenotrophic methanogens but decrease the abundance of the acetotrophic ones. While for bacterial community, the taxonomic analysis suggested that Syntrophorhabdus (27.40%) was the dominant genus promoting the efficient TA degradation under mesophilic condition, whereas OPB95 (24.99%) and TA06 (14.01%) related populations were largely observed and probably take some crucial role in TA degradation under thermophilic condition. Copyright © 2017 Elsevier Ltd. All rights reserved.

  2. A 10-MWe solar-thermal central-receiver pilot plant: Solar facilities design integration. Plant operating/training manual (RADL-Item 2-36)

    NASA Astrophysics Data System (ADS)

    1982-07-01

    Plant and system level operating instructions are provided for the Barstow Solar Pilot Plant. Individual status instructions are given that identify plant conditions, process controller responsibilities, process conditions and control accuracies, operating envelopes, and operator cautions appropriate to the operating condition. Transition operating instructions identify the sequence of activities to be carried out to accomplish the indicated transition. Most transitions involve the startup or shutdown of an individual flowpath. Background information is provided on collector field operations, and the heliostat groupings and specific commands used in support receiver startup are defined.

  3. Meta-proteomic analysis of protein expression distinctive to electricity-generating biofilm communities in air-cathode microbial fuel cells.

    PubMed

    Chignell, Jeremy F; De Long, Susan K; Reardon, Kenneth F

    2018-01-01

    Bioelectrochemical systems (BESs) harness electrons from microbial respiration to generate power or chemical products from a variety of organic feedstocks, including lignocellulosic biomass, fermentation byproducts, and wastewater sludge. In some BESs, such as microbial fuel cells (MFCs), bacteria living in a biofilm use the anode as an electron acceptor for electrons harvested from organic materials such as lignocellulosic biomass or waste byproducts, generating energy that may be used by humans. Many BES applications use bacterial biofilm communities, but no studies have investigated protein expression by the anode biofilm community as a whole. To discover functional protein expression during current generation that may be useful for MFC optimization, a label-free meta-proteomics approach was used to compare protein expression in acetate-fed anode biofilms before and after the onset of robust electricity generation. Meta-proteomic comparisons were integrated with 16S rRNA gene-based community analysis at four developmental stages. The community composition shifted from dominance by aerobic Gammaproteobacteria (90.9 ± 3.3%) during initial biofilm formation to dominance by Deltaproteobacteria , particularly Geobacter (68.7 ± 3.6%) in mature, electricity-generating anodes. Community diversity in the intermediate stage, just after robust current generation began, was double that at the early stage and nearly double that of mature anode communities. Maximum current densities at the intermediate stage, however, were relatively similar (~ 83%) to those achieved by mature-stage biofilms. Meta-proteomic analysis, correlated with population changes, revealed significant enrichment of categories specific to membrane and transport functions among proteins from electricity-producing biofilms. Proteins detected only in electricity-producing biofilms were associated with gluconeogenesis, the glyoxylate cycle, and fatty acid β-oxidation, as well as with denitrification and competitive inhibition. The results demonstrate that it is possible for an MFC microbial community to generate robust current densities while exhibiting high taxonomic diversity. Moreover, these data provide evidence to suggest that startup growth of air-cathode MFCs under conditions that promote the establishment of aerobic-anaerobic syntrophy may decrease startup times. This study represents the first investigation into protein expression of a complex BES anode biofilm community as a whole. The findings contribute to understanding of the molecular mechanisms at work during BES startup and suggest options for improvement of BES generation of bioelectricity from renewable biomass.

  4. Numerical investigation of separated nozzle flows

    NASA Technical Reports Server (NTRS)

    Chen, C. L.; Chakravarthy, S. R.; Hung, C. M.

    1994-01-01

    A numerical study of axisymmetric overexpanded nozzle is presented. The flow structure of the startup and throttle-down processes are examined. During the impulsive startup process, observed flow features include the Mach disk, separation shock, Mach stem, vortex core, contact surface, slip stream, initial shock front, and shocklet. Also the movement of the Mach disk is not monotonical in the downstream direction. For a range of pressure ratios, hysteresis phenomenon occurs; different solutions were obtained depending on different processes. Three types of flow structures were observed. The location of separation point and the lower end turning point of hysteresis are closely predicted. A high peak of pressure is associated with the nozzle flow reattachment. The reversed vortical structure and affects engine performance.

  5. New Generation Strategic Submarine Study

    DTIC Science & Technology

    1977-01-01

    Ship Propulsion System . 111-22 III- A -6 Simplified Functional Diagram - Steam-Feed Flow System . 111-23 III- A -7...16 Aa Tabte XIZ- A -3 System (Element) Functional Analysis ResuZts--Engineering p Plant Subsystem SYSTEM (ELEMENT) FUNCTION Ll A . Ship Propulsion 1...FUNCTION A . Ship Propulsion (cont’d) 9. SSTG Throttle Valves * Provide frequency control of the ship’s service turbine generators, startup and

  6. Field tests of a participatory ergonomics toolkit for Total Worker Health

    PubMed Central

    Kernan, Laura; Plaku-Alakbarova, Bora; Robertson, Michelle; Warren, Nicholas; Henning, Robert

    2018-01-01

    Growing interest in Total Worker Health® (TWH) programs to advance worker safety, health and well-being motivated development of a toolkit to guide their implementation. Iterative design of a program toolkit occurred in which participatory ergonomics (PE) served as the primary basis to plan integrated TWH interventions in four diverse organizations. The toolkit provided start-up guides for committee formation and training, and a structured PE process for generating integrated TWH interventions. Process data from program facilitators and participants throughout program implementation were used for iterative toolkit design. Program success depended on organizational commitment to regular design team meetings with a trained facilitator, the availability of subject matter experts on ergonomics and health to support the design process, and retraining whenever committee turnover occurred. A two committee structure (employee Design Team, management Steering Committee) provided advantages over a single, multilevel committee structure, and enhanced the planning, communication, and team-work skills of participants. PMID:28166897

  7. Lean and Information Technology Toolkit

    EPA Pesticide Factsheets

    The Lean and Information Technology Toolkit is a how-to guide which provides resources to environmental agencies to help them use Lean Startup, Lean process improvement, and Agile tools to streamline and automate processes.

  8. Design and experimental investigation of a neon cryogenic loop heat pipe

    NASA Astrophysics Data System (ADS)

    He, Jiang; Guo, Yuandong; Zhang, Hongxing; Miao, Jianyin; Wang, Lu; Lin, Guiping

    2017-11-01

    Next generation space infrared sensor and detector have pressing requirement for cryogenic heat transport technology in the temperature range of 30-40 K. Cryogenic loop heat pipe (CLHP) has excellent thermal performance and particular characteristics such as high flexibility transport lines and no moving parts, thus it is regarded as an ideal thermal control solution. A neon CLHP referring to infrared point-to-point heat transfer element in future space application has been designed and experimented. And it could realize supercritical startup successfully. Experimental results show that the supercritical startup were realized successfully at cases of 1.5 W secondary evaporator power, but the startup was failed when 0.5 and 1 W heat load applied to secondary evaporator. The maximum heat transport capability of primary evaporator is between 4.5 and 5 W with proper auxiliary heat load. Before startup, even the heat sink temperature decreased to 35 K, the primary evaporator can still maintain at almost 290 K; and the primary evaporator temperature increased at once when the powers were cut off, which indicated the CLHP has a perfect function of thermal switch. The CLHP could adapt to sudden changes of the primary evaporator power, and reach a new steady-state quickly. Besides, some failure phenomena were observed during the test, which indicated that proper secondary evaporator power and heat sink temperature play important roles on the normal operation.

  9. Saccharomyces cerevisiae strains for second-generation ethanol production: from academic exploration to industrial implementation

    PubMed Central

    Jansen, Mickel L. A.; Bracher, Jasmine M.; Papapetridis, Ioannis; Verhoeven, Maarten D.; de Bruijn, Hans; de Waal, Paul P.; van Maris, Antonius J. A.; Klaassen, Paul

    2017-01-01

    Abstract The recent start-up of several full-scale ‘second generation’ ethanol plants marks a major milestone in the development of Saccharomyces cerevisiae strains for fermentation of lignocellulosic hydrolysates of agricultural residues and energy crops. After a discussion of the challenges that these novel industrial contexts impose on yeast strains, this minireview describes key metabolic engineering strategies that have been developed to address these challenges. Additionally, it outlines how proof-of-concept studies, often developed in academic settings, can be used for the development of robust strain platforms that meet the requirements for industrial application. Fermentation performance of current engineered industrial S. cerevisiae strains is no longer a bottleneck in efforts to achieve the projected outputs of the first large-scale second-generation ethanol plants. Academic and industrial yeast research will continue to strengthen the economic value position of second-generation ethanol production by further improving fermentation kinetics, product yield and cellular robustness under process conditions. PMID:28899031

  10. Loop Heat Pipe Startup Behaviors

    NASA Technical Reports Server (NTRS)

    Ku, Jentung

    2014-01-01

    A loop heat pipe must start successfully before it can commence its service. The start-up transient represents one of the most complex phenomena in the loop heat pipe operation. This paper discusses various aspects of loop heat pipe start-up behaviors. Topics include the four start-up scenarios, the initial fluid distribution between the evaporator and reservoir that determines the start-up scenario, factors that affect the fluid distribution between the evaporator and reservoir, difficulties encountered during the low power start-up, and methods to enhance the start-up success. Also addressed are the thermodynamic constraint between the evaporator and reservoir in the loop heat pipe operation, the superheat requirement for nucleate boiling, pressure spike and pressure surge during the start-up transient, and repeated cycles of loop start-up andshutdown under certain conditions.

  11. Dynamic biogas upgrading based on the Sabatier process: thermodynamic and dynamic process simulation.

    PubMed

    Jürgensen, Lars; Ehimen, Ehiaze Augustine; Born, Jens; Holm-Nielsen, Jens Bo

    2015-02-01

    This study aimed to investigate the feasibility of substitute natural gas (SNG) generation using biogas from anaerobic digestion and hydrogen from renewable energy systems. Using thermodynamic equilibrium analysis, kinetic reactor modeling and transient simulation, an integrated approach for the operation of a biogas-based Sabatier process was put forward, which was then verified using a lab scale heterogenous methanation reactor. The process simulation using a kinetic reactor model demonstrated the feasibility of the production of SNG at gas grid standards using a single reactor setup. The Wobbe index, CO2 content and calorific value were found to be controllable by the H2/CO2 ratio fed the methanation reactor. An optimal H2/CO2 ratio of 3.45-3.7 was seen to result in a product gas with high calorific value and Wobbe index. The dynamic reactor simulation verified that the process start-up was feasible within several minutes to facilitate surplus electricity use from renewable energy systems. Copyright © 2014 Elsevier Ltd. All rights reserved.

  12. Start-up and operation strategies on the liquefied food waste anaerobic digestion and a full-scale case application.

    PubMed

    Meng, Ying; Shen, Fei; Yuan, Hairong; Zou, Dexun; Liu, Yanping; Zhu, Baoning; Chufo, Akiber; Jaffar, Muhammad; Li, Xiujin

    2014-11-01

    Batch anaerobic digestion was employed to investigate the efficient start-up strategies for the liquefied food waste, and sequencing batch digestion was also performed to determine maximum influent organic loading rate (OLR) for efficient and stable operation. The results indicated that the start-up could be well improved using appropriate wastewater organic load and food-to-microorganism ratios (F/M). When digestion was initialized at low chemical oxygen demand (COD) concentration of 20.0 gCOD L(-1), the start-up would go well using lower F/M ratio of 0.5-0.7. The OLR 7.0 gCOD L(-1) day(-1) was recommended for operating the ASBR digestion, in which the COD conversion of 96.7 ± 0.53% and biomethane yield of 3.5 ± 0.2 L gCOD(-1) were achieved, respectively. The instability would occur when OLR was higher than 7.0 gCOD L(-1) day(-1), and this instability was not recoverable. Lipid was suggested to be removed before anaerobic digestion. The anaerobic digestion process in engineering project ran well, and good performance was achieved when the start-up and operational strategies from laboratory study were applied. For case application, stable digestion performance was achieved in a digester (850 m(3) volume) with biogas production of 1.0-3.8 m(3) m(-3) day(-1).

  13. Startup and oxygen concentration effects in a continuous granular mixed flow autotrophic nitrogen removal reactor.

    PubMed

    Varas, Rodrigo; Guzmán-Fierro, Víctor; Giustinianovich, Elisa; Behar, Jack; Fernández, Katherina; Roeckel, Marlene

    2015-08-01

    The startup and performance of the completely autotrophic nitrogen removal over nitrite (CANON) process was tested in a continuously fed granular bubble column reactor (BCR) with two different aeration strategies: controlling the oxygen volumetric flow and oxygen concentration. During the startup with the control of oxygen volumetric flow, the air volume was adjusted to 60mL/h and the CANON reactor had volumetric N loadings ranging from 7.35 to 100.90mgN/Ld with 36-71% total nitrogen removal and high instability. In the second stage, the reactor was operated at oxygen concentrations of 0.6, 0.4 and 0.2mg/L. The best condition was 0.2 mgO2/L with a total nitrogen removal of 75.36% with a CANON reactor activity of 0.1149gN/gVVSd and high stability. The feasibility and effectiveness of CANON processes with oxygen control was demonstrated, showing an alternative design tool for efficiently removing nitrogen species. Copyright © 2015 Elsevier Ltd. All rights reserved.

  14. Strategies for merging microbial fuel cell technologies in water desalination processes: Start-up protocol and desalination efficiency assessment

    NASA Astrophysics Data System (ADS)

    Borjas, Zulema; Esteve-Núñez, Abraham; Ortiz, Juan Manuel

    2017-07-01

    Microbial Desalination Cells constitute an innovative technology where microbial fuel cell and electrodialysis merge in the same device for obtaining fresh water from saline water with no energy-associated cost for the user. In this work, an anodic biofilm of the electroactive bacteria Geobacter sulfurreducens was able to efficiently convert the acetate present in synthetic waste water into electric current (j = 0.32 mA cm-2) able to desalinate water. .Moreover, we implemented an efficient start-up protocol where desalination up to 90% occurred in a desalination cycle (water production:0.308 L m-2 h-1, initial salinity: 9 mS cm-1, final salinity: <1 mS cm-1) using a filter press-based MDC prototype without any energy supply (excluding peristaltic pump energy). This start-up protocol is not only optimized for time but also simplifies operational procedures making it a more feasible strategy for future scaling-up of MDCs either as a single process or as a pre-treatment method combined with other well established desalination technologies such as reverse osmosis (RO) or reverse electrodialysis.

  15. JEN-1 Reactor Control System; SISTEMA DE CONTROL DEL REACTOR JEN-1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cantillo, M.F.; Nuno, C.M.; Andreu, J.L.M.

    1963-01-01

    ABS>The JEN-1 3Mw power swimming pool reactor electrical control circuits are described. Start-up, power generation in the core, and shutdown are controlled by the reactor control system. This control system guarantees in each moment the safety conditions during reactor operation. Each circuit was represented by a scheme, complemented with a description of its function, components, and operation theory. Components described include: scram circuit; fission counter control circuit; servo control circuit; control circuit of safety sheets; control circuits of primary, secondary, and clean-up pump motors and tower fan motor; primary valve motor circuit; center cubicle alarm circuit; and process alarm circuit.more » (auth)« less

  16. Thermal Vacuum Testing of a Helium Loop Heat Pipe for Large Area Cryocooling

    NASA Technical Reports Server (NTRS)

    Ku, Jentung; Robinson, Franklin

    2016-01-01

    A loop heat pipe must start successfully before it can commence its service. The startup transient represents one of the most complex phenomena in the loop heat pipe operation. This paper discusses various aspects of loop heat pipe startup behaviors. Topics include the four startup scenarios, the initial fluid distribution between the evaporator and reservoir that determines the startup scenario, factors that affect the fluid distribution between the evaporator and reservoir, difficulties encountered during the low power startup, and methods to enhance the startup success. Also addressed are the pressure spike and pressure surge during the startup transient, and repeated cycles of loop startup and shutdown under certain conditions.

  17. 40 CFR 63.1111 - Startup, shutdown, and malfunction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 11 2013-07-01 2013-07-01 false Startup, shutdown, and malfunction. 63... Control Technology Standards § 63.1111 Startup, shutdown, and malfunction. (a) Startup, shutdown, and... develop a written startup, shutdown, and malfunction plan that describes, in detail, procedures for...

  18. 40 CFR 63.1111 - Startup, shutdown, and malfunction.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 11 2014-07-01 2014-07-01 false Startup, shutdown, and malfunction. 63... Control Technology Standards § 63.1111 Startup, shutdown, and malfunction. (a) Startup, shutdown, and... develop a written startup, shutdown, and malfunction plan that describes, in detail, procedures for...

  19. 40 CFR 63.1111 - Startup, shutdown, and malfunction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 11 2012-07-01 2012-07-01 false Startup, shutdown, and malfunction. 63... Control Technology Standards § 63.1111 Startup, shutdown, and malfunction. (a) Startup, shutdown, and... develop a written startup, shutdown, and malfunction plan that describes, in detail, procedures for...

  20. 40 CFR 63.1111 - Startup, shutdown, and malfunction.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 10 2011-07-01 2011-07-01 false Startup, shutdown, and malfunction. 63... Control Technology Standards § 63.1111 Startup, shutdown, and malfunction. (a) Startup, shutdown, and... develop a written startup, shutdown, and malfunction plan that describes, in detail, procedures for...

  1. Startup of the Anammox Process in a Membrane Bioreactor (AnMBR) from Conventional Activated Sludge.

    PubMed

    Gutwiński, P; Cema, G; Ziembińska-Buczyńska, A; Surmacz-Górska, J; Osadnik, M

    2016-12-01

      In this study, a laboratory-scale anammox process in a membrane bioreactor (AnMBR) was used to startup the anaerobic ammonium oxidation (anammox) process from conventional activated sludge. Stable operation was achieved after 125 days. From that time, nitrogen load was gradually increased. After six months, the average nitrogen removal efficiency exceeded 80%. The highest obtained special anammox activity (SAA) achieved was 0.17 g (-N + -N) (g VSS × d)-1. Fluorescent in situ hybridization also proved the presence of the anammox bacteria, typically a genus of Brocadia anammoxidans and Kuenenia stuttgartiensis.

  2. Canadian biotechnology start-ups, 1991-1997: the role of incumbents' patents and strategic alliances in controlling competition.

    PubMed

    Calabrese, T; Baum, J A; Silverman, B S

    2000-12-01

    Fligstein (1996) contends that organizations act to exploit the institutional context in which they are embedded so as to stabilize the competition they face. Drawing on Fligstein's theoretical analysis, we conceptualize incumbent biotechnology firms' patent-ing and alliance-building activities as attempts to stabilize and control potential competition and analyze how these activities shape rates of founding in the Canadian biotechnology industry. We find that increases in the level and concentration of incumbents' patenting discourage founding, particularly in human application sectors of the industry where development and approval processes are more costly and time consuming. Incumbents' horizontal alliances depress start-ups; vertical alliances stimulate start-ups. Our findings highlight how technology appropriation and strategic alliances structure the competitive dynamics and evolution of high-technology, knowledge-intensive industries.

  3. Methods for increasing the rate of anammox attachment in a sidestream deammonification MBBR.

    PubMed

    Klaus, Stephanie; McLee, Patrick; Schuler, Andrew J; Bott, Charles

    2016-01-01

    Deammonification (partial nitritation-anammox) is a proven process for the treatment of high-nitrogen waste streams, but long startup time is a known drawback of this technology. In a deammonification moving bed biofilm reactor (MBBR), startup time could potentially be decreased by increasing the attachment rate of anammox bacteria (AMX) on virgin plastic media. Previous studies have shown that bacterial adhesion rates can be increased by surface modification or by the development of a preliminary biofilm. This is the first study on increasing AMX attachment rates in a deammonification MBBR using these methods. Experimental media consisted of three different wet-chemical surface treatments, and also media transferred from a full-scale mainstream fully nitrifying integrated fixed-film activated sludge (IFAS) reactor. Following startup of a full-scale deammonification reactor, the experimental media were placed in the full-scale reactor and removed for activity rate measurements and biomass testing after 1 and 2 months. The media transferred from the IFAS process exhibited a rapid increase in AMX activity rates (1.1 g/m(2)/day NH(4)(+) removal and 1.4 g/m(2)/day NO(2)(-) removal) as compared to the control (0.2 g/m(2)/day NH(4)(+) removal and 0.1 g/m(2)/day NO(2)(-) removal) after 1 month. Two out of three of the surface modifications resulted in significantly higher AMX activity than the control at 1 and 2 months. No nitrite oxidizing bacteria activity was detected in either the surface modified media or IFAS media batch tests. The results indicate that startup time of a deammonification MBBR could potentially be decreased through surface modification of the plastic media or through the transfer of media from a mature IFAS process.

  4. Investigation report: H Reactor mischarging incident

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vinther, A.P.

    1964-05-01

    All cold reactor start-up procedures require the vertical safety rods (VSR) to be withdrawn in pairs with specific waiting periods between each pair withdrawal. This rod withdrawal procedure will assure an early and safe detection of reactor criticality should reactor reactivity conditions be different than predicted so that proper corrective actions can be taken. During the paired VSR removal of H reactor on April 17, 1964, while preparing for reactor start-up, an extremely low level rising period was detected with six VSR's still in the reactor. The withdrawn VSR's were promptly re-inserted. During the next several days other process difficultiesmore » were encountered. H Processing personnel began investigating the possibility that a number of process tubes might have been mischarged; one shift's charging effort appeared to be suspect as longitudinal peaking appeared nearly twice as severe as normal in the distorted region. Following verification of a charging error in the suspect group of 171 tubes, that group of tubes was discharged and recharged with the proper charge make-up. On April 24, during VSR removal for start-up, low level criticality was detected with three VSR's still in the unit. The VSR's were re-inserted and Operational Physics analysis requested. Following installation of additional poisoning, the Operational Physics analysis uncovered a reactivity prediction error related to the prior operation with the skewed flux distribution. However, in this case, as on April 17, the procedural paired VSR withdrawal provided safe detection of the criticality condition in adequate time to take prompt corrective action. A successful reactor start-up was then achieved later on April 24, and reactor operation has been normal since that time. 4 figs.« less

  5. Simplified Novel Application (SNApp) framework: a guide to developing and implementing second-generation mobile applications for behavioral health research.

    PubMed

    Fillo, Jennifer; Staplefoote-Boynton, B Lynette; Martinez, Angel; Sontag-Padilla, Lisa; Shadel, William G; Martino, Steven C; Setodji, Claude M; Meeker, Daniella; Scharf, Deborah

    2016-12-01

    Advances in mobile technology and mobile applications (apps) have opened up an exciting new frontier for behavioral health researchers, with a "second generation" of apps allowing for the simultaneous collection of multiple streams of data in real time. With this comes a host of technical decisions and ethical considerations unique to this evolving approach to research. Drawing on our experience developing a second-generation app for the simultaneous collection of text message, voice, and self-report data, we provide a framework for researchers interested in developing and using second-generation mobile apps to study health behaviors. Our Simplified Novel Application (SNApp) framework breaks the app development process into four phases: (1) information and resource gathering, (2) software and hardware decisions, (3) software development and testing, and (4) study start-up and implementation. At each phase, we address common challenges and ethical issues and make suggestions for effective and efficient app development. Our goal is to help researchers effectively balance priorities related to the function of the app with the realities of app development, human subjects issues, and project resource constraints.

  6. A water-powered Energy Harvesting system with Bluetooth Low Energy interface

    NASA Astrophysics Data System (ADS)

    Kroener, M.; Allinger, K.; Berger, M.; Grether, E.; Wieland, F.; Heller, S.; Woias, P.

    2016-11-01

    This paper reports the design, and testing of a water turbine generator system for typical flow rates in domestic applications, with an integrated power management and a Bluetooth low energy (BLE) based RF data transmission interface. It is based on a commercially available low cost hydro generator. The generator is built into a housing with optimized reduced fluidic resistance to enable operation with flow rates as low as 6 l/min. The power management combines rectification, buffering, defined start-up, and circuit protection. An MSP430FR5949 microcontroller is used for data acquisition and processing. The data are transmitted via RF, using a Bluegiga BLE112 module in advertisement mode, to a PC where the measured flow rate is stored and displayed. The transmission rate of the wireless sensor node (WSN) is set to 1 Hz if enough power is available, which is the case for flow rates above 5.5 l/min. The electronics power demand is calculated to be 340 μW in average, while the generator is capable of delivering more than 200 mW for flow rates above 15 l/min.

  7. Efforts to control radiation build-up in Ringhals

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Egner, K.; Aronsson, P.O.; Erixon, O.

    1995-03-01

    It is well known that good control of the primary chemistry in a PWR is essential in order to minimize material problems and fuel damages. It has also been well established that the water chemistry has a great influence on accumulation of corrosion products on the fuel and the radiation build-up on primary system surfaces. Ringhals was one of the pioneers to increase operating pH in order to reduce radiation build-up and has now been operating for ten years with pH at 7.4 or (in later years) 7.2. Our experience is favourable and includes low radiation levels in the newmore » (1989) steam generators of Ringhals 2. Ringhals 4 has operated almost its whole life at pH 7.2 or higher and it remains one of the cleanest PWRs of its vintage. In addition to strict adherence to a stable operating chemistry, Ringhals is now working on a program with the aim to find optimum shut-down and start-up chemistry to reduce activity levels in the primary systems. A particular goal is to use the shut-down and start-up chemistry at the 1994 outage in Ringhals 3 in order to reduce doserates in preparation for the planned steam generator replacement in 1995. The paper summarizes the experience to date of the established operating chemistry, on-going tests with modified shut-down and start-up chemistry and other measures to limit or reduce the activity build-up.« less

  8. Hazardous substances releases associated with Hurricanes Katrina and Rita in industrial settings, Louisiana and Texas.

    PubMed

    Ruckart, Perri Zeitz; Orr, Maureen F; Lanier, Kenneth; Koehler, Allison

    2008-11-15

    The scientific literature concerning the public health response to the unprecedented hurricanes striking the Gulf Coast in August and September 2005 has focused mainly on assessing health-related needs and surveillance of injuries, infectious diseases, and other illnesses. However, the hurricanes also resulted in unintended hazardous substances releases in the affected states. Data from two states (Louisiana and Texas) participating in the Hazardous Substances Emergency Events Surveillance (HSEES) system were analyzed to describe the characteristics of hazardous substances releases in industrial settings associated with Hurricanes Katrina and Rita. HSEES is an active multi-state Web-based surveillance system maintained by the Agency for Toxic Substances and Disease Registry (ATSDR). In 2005, 166 hurricane-related hazardous substances events in industrial settings in Louisiana and Texas were reported. Most (72.3%) releases were due to emergency shut downs in preparation for the hurricanes and start-ups after the hurricanes. Emphasis is given to the contributing causal factors, hazardous substances released, and event scenarios. Recommendations are made to prevent or minimize acute releases of hazardous substances during future hurricanes, including installing backup power generation, securing equipment and piping to withstand high winds, establishing procedures to shutdown process operations safely, following established and up-to-date start-up procedures and checklists, and carefully performing pre-start-up safety reviews.

  9. Anammox-based technologies for nitrogen removal: Advances in process start-up and remaining issues.

    PubMed

    Ali, Muhammad; Okabe, Satoshi

    2015-12-01

    Nitrogen removal from wastewater via anaerobic ammonium oxidation (anammox)-based process has been recognized as efficient, cost-effective and low energy alternative to the conventional nitrification and denitrification processes. To date, more than one hundred full-scale anammox plants have been installed and operated for treatment of NH4(+)-rich wastewater streams around the world, and the number is increasing rapidly. Since the discovery of anammox process, extensive researches have been done to develop various anammox-based technologies. However, there are still some challenges in practical application of anammox-based treatment process at full-scale, e.g., longer start-up period, limited application to mainstream municipal wastewater and poor effluent water quality. This paper aimed to summarize recent status of application of anammox process and researches on technological development for solving these remaining problems. In addition, an integrated system of anammox-based process and microbial fuel cell is proposed for sustainable and energy-positive wastewater treatment. Copyright © 2015 Elsevier Ltd. All rights reserved.

  10. 40 CFR 62.15150 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 62.15150 Section 62.15150 Protection of... § 62.15150 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...

  11. 40 CFR 60.1220 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... during periods of startup, shutdown, and malfunction? 60.1220 Section 60.1220 Protection of Environment... Emission Limits § 60.1220 What happens to the emission limits during periods of startup, shutdown, and... waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or malfunction must...

  12. 40 CFR 60.1220 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... during periods of startup, shutdown, and malfunction? 60.1220 Section 60.1220 Protection of Environment... Emission Limits § 60.1220 What happens to the emission limits during periods of startup, shutdown, and... waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or malfunction must...

  13. 40 CFR 60.1220 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... during periods of startup, shutdown, and malfunction? 60.1220 Section 60.1220 Protection of Environment... Emission Limits § 60.1220 What happens to the emission limits during periods of startup, shutdown, and... waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or malfunction must...

  14. 40 CFR 62.15150 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 62.15150 Section 62.15150 Protection of... § 62.15150 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...

  15. 40 CFR 60.1220 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... during periods of startup, shutdown, and malfunction? 60.1220 Section 60.1220 Protection of Environment... Emission Limits § 60.1220 What happens to the emission limits during periods of startup, shutdown, and... waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or malfunction must...

  16. 40 CFR 60.1695 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 60.1695 Section 60.1695 Protection of... Requirements § 60.1695 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...

  17. 40 CFR 62.15150 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 62.15150 Section 62.15150 Protection of... § 62.15150 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...

  18. 40 CFR 62.15150 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 62.15150 Section 62.15150 Protection of... § 62.15150 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...

  19. 40 CFR 60.1695 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 60.1695 Section 60.1695 Protection of... Requirements § 60.1695 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...

  20. 40 CFR 60.1220 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... during periods of startup, shutdown, and malfunction? 60.1220 Section 60.1220 Protection of Environment... Emission Limits § 60.1220 What happens to the emission limits during periods of startup, shutdown, and... waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or malfunction must...

  1. 40 CFR 60.1695 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 60.1695 Section 60.1695 Protection of... Requirements § 60.1695 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...

  2. 40 CFR 60.1695 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 60.1695 Section 60.1695 Protection of... Requirements § 60.1695 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...

  3. 40 CFR 62.15150 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 62.15150 Section 62.15150 Protection of... § 62.15150 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...

  4. 40 CFR 60.1695 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 60.1695 Section 60.1695 Protection of... Requirements § 60.1695 What happens to the operating requirements during periods of startup, shutdown, and... municipal waste combustion unit startup, shutdown, or malfunction. (b) Each startup, shutdown, or...

  5. Evaluation of the synergistic effects of milk proteins in a rapid viscosity analyzer.

    PubMed

    Stephani, Rodrigo; Borges de Souza, Alisson; Leal de Oliveira, Marcone Augusto; Perrone, Ítalo Tuler; Fernandes de Carvalho, Antônio; Cappa de Oliveira, Luiz Fernando

    2015-12-01

    Protein systems (PS) are routinely used by companies from Brazil and around the globe to improve the texture, yield, and palatability of processed foods. Understanding the synergistic behavior among the different protein structures of these systems during thermal treatment under the influence of pH can help to better define optimum conditions for products and processes. The interpretation of the reactions and interactions that occur simultaneously among the protein constituents of these systems as dispersions during thermal processing is still a major challenge. Here, using a rapid viscosity analyzer, we observed the rheological changes in the startup viscosities of 5 PS obtained by combining varying proportions of milk protein concentrate and whey protein concentrate under different conditions of pH (5.0, 6.5, and 7.0) and heat processing (85°C/15min and 95°C/5min). The solutions were standardized to 25% of total solids and 17% of protein. Ten analytical parameters were used to characterize each of the startup-viscosity ramps for 35 experiments conducted in a 2×3 × 5 mixed planning matrix, using principal component analysis to interpret behavioral similarities. The study showed the clear influence of pH 5.5 in the elevation of the initial temperature of the PS startup viscosity by at least 5°C, as well as the effect of different milk protein concentrate:whey protein concentrate ratios above 15:85 at pH 7.0 on the viscographic profile curves. These results suggested that the primary agent driving the changes was the synergism among the reactions and interactions of casein with whey proteins during processing. This study reinforces the importance of the rapid viscosity analyzer as an analytical tool for the simulation of industrial processes involving PS, and the use of the startup viscosity ramp as a means of interpreting the interactions of system components with respect to changes related to the treatment temperature. Copyright © 2015 American Dairy Science Association. Published by Elsevier Inc. All rights reserved.

  6. Using low frequency and intensity ultrasound to enhance start-up and operation performance of Anammox process inoculated with the conventional sludge.

    PubMed

    Wang, Tao; Zhang, Diandian; Sun, Yating; Zhou, Shanshan; Li, Lin; Shao, Jingjing

    2018-04-01

    A lab-scale ultrasound enhancing Anammox reactor (R1) was established and irradiated once a week by ultrasound with the optimal parameter (frequency of 25 kHz, intensity of 0.2 W cm -2 and exposure time of 3 min) obtained by batch experiments. R1 and the controlled Anammox reactor (R2) without exposure to the ultrasound were operated in parallel. The start-up period of Anammox process (53 days) in R1 was shorter than that (61 days) in R2. The nitrogen loading-enhancing period (day 53-day 135) in R1 was also shorter than that (day 61-day 151) in R2. At the end of the nitrogen loading-enhancing period, NLR (0.76 kg N m -3  d -1 ) and NRR (0.68 kg N m -3  d -1 ) of R1 were both higher than NLR (0.66 kg N m -3  d -1 ) and NRR (0.56 kg N m -3  d -1 ) of R2. Moreover, The stability of Anammox process in R1 was better than that in R2. The results demonstrated that the periodical irradiation of ultrasound enhanced the start-up and operational performance of Anammox reactor. Microbial community analysis indicated that the ultrasound accelerated the microbial succession from some other bacteria to Anammox bacteria so that shorten the start-up period of Anammox process from the conventional activated sludge. It also indicated that the ultrasound strengthened the competitive advantage of Candidatus Kuenenia stuttgartiensis in Anammox bacteria of the mature sludge so as to enhance the nitrogen removal performance of the Anammox reactor under the operation condition of high nitrogen loading. Copyright © 2017 Elsevier B.V. All rights reserved.

  7. Startup and stability of a small spherical tokamak

    NASA Astrophysics Data System (ADS)

    Garstka, Gregory Douglas

    1997-09-01

    The spherical tokamak (ST) is an evolutionary extension of the conventional tokamak concept where the aspect ratio is less than 2. These devices may possess significant advantages over standard tokamaks-they are capable of achieving higher values of /beta, seem to be more resilient to disruptions, and are significantly smaller than conventional tokamaks. Two important questions for the next generation of spherical tokamaks concern startup and internal reconnection events (IREs). Understanding startup is crucial due to the limited amount of ohmic flux in an ST. The IREs are disruption- like events observed on STs that do not result in termination of the current channel. Experiments have been conducted on the Madison EDUcational Small Aspect-ratio (MEDUSA) tokamak to answer some of the questions about startup and IREs in STs. MEDUSA is a small ohmic tokamak with an insulating vacuum vessel. Major parameters are R=12 cm, a=8 cm, Ip=10-40 kA, BT=0.2-0.45 T, /Delta tpulse=1-2 ms, /langle ne/rangle/approx5×1019/ m-3, and Te0/approx100 eV. The experiments in this work were aided by an internal magnetic probe array that constrained the reconstruction of MHD equilibria. It was found that startup efficiency, measured by the Ejima coefficient CE, improved with increasing loop voltage and toroidal field. Double tearing modes were found to be an important mechanism for current penetration in MEDUSA; their presence early in the discharge can improve the magnetic flux consumption. The lowest achieved value of the Ejima coefficient was 0.61 (0.13 for 'OH only') for a discharge with 0.375 T toroidal field and 9.4 V startup loop voltage. The study of internal reconnection events revealed the presence of a heretofore undiscovered precursor, which in MEDUSA was manifested as coherent oscillations in the internal poloidal field at 65-75 kHz for 100 μs prior to the IRE. These events were found to result in decreased /ell i and /beta, inward movement of the magnetic axis, dramatically increased q0 and slightly decreased q98. The magnetic helicity was found to change between -15% and +28% over an IRE.

  8. Comparative study on power generation of dual-cathode microbial fuel cell according to polarization methods.

    PubMed

    Lee, Kang-yu; Ryu, Wyan-seuk; Cho, Sung-il; Lim, Kyeong-ho

    2015-11-01

    Microbial fuel cells (MFCs) exist in various forms depending on the type of pollutant to be removed and the expected performance. Dual-cathode MFCs, with their simple structure, are capable of removing both organic matter and nitrogen. Moreover, various methods are available for the collection of polarization data, which can be used to calculate the maximum power density, an important factor of MFCs. Many researchers prefer the method of varying the external resistance in a single-cycle due to the short measurement time and high accuracy. This study compared power densities of dual-cathode MFCs in a single-cycle with values calculated over multi-cycles to determine the optimal polarization method. External resistance was varied from high to low and vice versa in the single-cycle, to calculate power density. External resistance was organized in descending order with initial start-up at open circuit voltage (OCV), and then it was organized in descending order again after the initial start-up at 1000 Ω. As a result, power density was underestimated at the anoxic cathode when the external resistance was varied from low to high, and overestimated at the aerobic cathode and anoxic cathode when external resistance at OCV was reduced following initial start-up. In calculating the power densities of dual-cathode MFCs, this paper recommends the method of gradually reducing the external resistance after initial start-up with high external resistance. Copyright © 2015 Elsevier Ltd. All rights reserved.

  9. 77 FR 73968 - Reconsideration of Certain New Source and Startup/Shutdown Issues: National Emission Standards...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-12

    ... Units and Standards of Performance for Fossil-Fuel-Fired Electric Utility, Industrial-Commercial...- and Oil-fired Electric Utility Steam Generating Units and Standards of Performance for Fossil-Fuel... Units and Standards of Performance for Fossil-Fuel-Fired Electric Utility, Industrial-Commercial...

  10. 76 FR 28623 - Small Business Week, 2011

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-18

    ... make it a reality. Successful businesses start much the same way--as ideas realized by entrepreneurs... opportunities for small business owners and the next generation of entrepreneurs, who will help us out-innovate... our economy and our way of life. Startup America will give entrepreneurs the tools they need to build...

  11. Life Science Start-up Activities at the Universities of Applied Sciences (UAS).

    PubMed

    Huber, Gerda

    2014-12-01

    The universities of applied sciences (UAS) provide several values for the society and economy of a country. Besides education of high level professionals, transfer of knowledge from research to applications in industry or as new start-up companies is an important task. This is done in different ways in the various disciplines. In Life Sciences, a key industry branch in Switzerland, innovation is a competitive success factor and research findings from UAS/Life Sciences contribute to the valorization of new technologies to products, services and to business performance. In order to foster awareness for the innovation need of industry, UAS install processes and support for transfer of research and technology results to marketable applications. Furthermore they may facilitate contacts of researchers and students with entrepreneurs in order to animate start-up founding as a true alternative to being employed. Access to coaching and entrepreneurial training completes the essential basis.

  12. Shortcut nitrification/partial nitritation start-up for reject water treatment in a SBR

    NASA Astrophysics Data System (ADS)

    Muszyński-Huhajło, Mateusz; Miodoński, Stanisław

    2017-11-01

    For many wastewater treatment plants (WWTPs), side-stream treatment of reject water from digested sludge dewatering is a feasible opportunity to improve N-removal efficiency without costly plant expansion. Biological nitrogen removal over nitrite or combined partial nitritation (PN)-Anammox process has recently become a popular treatment method for such ammonium-rich streams. Shortcut nitrification and PN start-ups were successfully performed in a pilot-scale SBR treating real reject water. In all performed experiments, effective nitrate production inhibition occurred in less than 20 days due to operational conditions selection and without advanced control system. pH adjustment in the PN reactor allowed to achieve NO2-N /NH4-N ratio suitable for Anammox process (1.24±0.07).

  13. 40 CFR Table 1a to Subpart Zzzz of... - Emission Limitations for Existing, New, and Reconstructed Spark Ignition, 4SRB Stationary RICE...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... following emission limitation, except during periods of startup . . . During periods of startup you must... the engine's startup time at startup to a period needed for appropriate and safe loading of the engine, not to exceed 30 minutes, after which time the non-startup emission limitations apply.1 b. Limit the...

  14. 40 CFR Table 1a to Subpart Zzzz of... - Emission Limitations for Existing, New, and Reconstructed Spark Ignition, 4SRB Stationary RICE...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... following emission limitation, except during periods of startup . . . During periods of startup you must... the engine's startup time at startup to a period needed for appropriate and safe loading of the engine, not to exceed 30 minutes, after which time the non-startup emission limitations apply.1 b. Limit the...

  15. 40 CFR Table 1a to Subpart Zzzz of... - Emission Limitations for Existing, New, and Reconstructed Spark Ignition, 4SRB Stationary RICE...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... following emission limitation, except during periods of startup . . . During periods of startup you must... the engine's startup time at startup to a period needed for appropriate and safe loading of the engine, not to exceed 30 minutes, after which time the non-startup emission limitations apply.1 b. Limit the...

  16. Genetic Counselors in Startup Companies: Redefining the Genetic Counselor Role.

    PubMed

    Rabideau, Marina M; Wong, Kenny; Gordon, Erynn S; Ryan, Lauren

    2016-08-01

    Genetic counselors (GCs) have recently begun moving into non-clinic based roles in increasing numbers. A relatively new role for GCs is working for startup companies. Startups are newly established companies in the phase of developing and researching new scalable businesses. This article explores the experiences of four GCs working at different startup companies and aims to provide resources for GCs interested in learning more about these types of roles. The article describes startup culture, including a relatively flat organizational structure, quick product iterations, and flexibility, among other unique cultural characteristics. Financial considerations are described, including how to understand and evaluate a company's financial status, along with a brief explanation of alternate forms of compensation including stock options and equity. Specifically, the article details the uncertainties and rewards of working in a fast-paced startup environment that affords opportunities to try new roles and use the genetic counseling skill set in new ways. This article aims to aid GCs in determining whether a startup environment would be a good fit, learning how to evaluate a specific startup, and understanding how to market themselves for positions at startups.

  17. 40 CFR 63.2861 - What reports must I submit and when?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... vegetable oil production process. (3) Each listed oilseed type processed during the 12 calendar months... oilseed type processed during the 12 operating months period for which you determined the deviation. (4....10(e)(3)(iii). (c) Periodic startup, shutdown, and malfunction report. If you choose to operate your...

  18. 78 FR 38001 - Reconsideration of Certain Startup/Shutdown Issues: National Emission Standards for Hazardous Air...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-25

    ... Standards of Performance for Fossil-Fuel-Fired Electric Utility, Industrial- Commercial-Institutional, and... Utility Steam Generating Units and Standards of Performance for Fossil-Fuel-Fired Electric Utility.... Electronic files should avoid the use of special characters, any form of encryption, and be free of any...

  19. Control Valve Trajectories for SOFC Hybrid System Startup

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gorrell, Megan; Banta, Larry; Rosen, William

    2012-07-01

    Control and management of cathode airflow in a solid oxide fuel cell gas turbine hybrid power system was analyzed using the Hybrid Performance (HyPer) hardware simulation at the National Energy Technology (NETL), U.S. Department of Energy. This work delves into previously unexplored operating practices for HyPer, via simultaneous manipulation of bypass valves and the electric load on the generator. The work is preparatory to the development of a Multi-Input, Multi-Output (MIMO) controller for HyPer. A factorial design of experiments was conducted to acquire data for 81 different combinations of the manipulated variables, which consisted of three air flow control valvesmore » and the electric load on the turbine generator. From this data the response surface for the cathode airflow with respect to bypass valve positions was analyzed. Of particular interest is the control of airflow through the cathode during system startup and during large load swings. This paper presents an algorithm for controlling air mass flow through the cathode based on a modification of the steepest ascent method.« less

  20. 40 CFR 63.1111 - Startup, shutdown, and malfunction.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Startup, shutdown, and malfunction. 63.1111 Section 63.1111 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... Control Technology Standards § 63.1111 Startup, shutdown, and malfunction. (a) Startup, shutdown, and...

  1. Field tests of a participatory ergonomics toolkit for Total Worker Health.

    PubMed

    Nobrega, Suzanne; Kernan, Laura; Plaku-Alakbarova, Bora; Robertson, Michelle; Warren, Nicholas; Henning, Robert

    2017-04-01

    Growing interest in Total Worker Health ® (TWH) programs to advance worker safety, health and well-being motivated development of a toolkit to guide their implementation. Iterative design of a program toolkit occurred in which participatory ergonomics (PE) served as the primary basis to plan integrated TWH interventions in four diverse organizations. The toolkit provided start-up guides for committee formation and training, and a structured PE process for generating integrated TWH interventions. Process data from program facilitators and participants throughout program implementation were used for iterative toolkit design. Program success depended on organizational commitment to regular design team meetings with a trained facilitator, the availability of subject matter experts on ergonomics and health to support the design process, and retraining whenever committee turnover occurred. A two committee structure (employee Design Team, management Steering Committee) provided advantages over a single, multilevel committee structure, and enhanced the planning, communication, and teamwork skills of participants. Copyright © 2016 Elsevier Ltd. All rights reserved.

  2. Fuel processing device

    DOEpatents

    Ahluwalia, Rajesh K [Burr Ridge, IL; Ahmed, Shabbir [Naperville, IL; Lee, Sheldon H. D. [Willowbrook, IL

    2011-08-02

    An improved fuel processor for fuel cells is provided whereby the startup time of the processor is less than sixty seconds and can be as low as 30 seconds, if not less. A rapid startup time is achieved by either igniting or allowing a small mixture of air and fuel to react over and warm up the catalyst of an autothermal reformer (ATR). The ATR then produces combustible gases to be subsequently oxidized on and simultaneously warm up water-gas shift zone catalysts. After normal operating temperature has been achieved, the proportion of air included with the fuel is greatly diminished.

  3. SOURCELESS STARTUP. A MACHINE CODE FOR COMPUTING LOW-SOURCE REACTOR STARTUPS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MacMillan, D.B.

    1960-06-01

    >A revision to the sourceless start-up code is presented. The code solves a system of differential equations encountered in computing the probability distribution of activity at an observed power level during reactor start-up from a very low source level. (J.R.D.)

  4. On a difficulty in eigenfunction expansion solutions for the start-up of fluid flow

    NASA Astrophysics Data System (ADS)

    Christov, Ivan C.

    2015-11-01

    Most mathematics and engineering textbooks describe the process of ``subtracting off'' the steady state of a linear parabolic partial differential equation as a technique for obtaining a boundary-value problem with homogeneous boundary conditions that can be solved by separation of variables (i.e., eigenfunction expansions). While this method produces the correct solution for the start-up of the flow of, e.g., a Newtonian fluid between parallel plates, it can lead to erroneous solutions to the corresponding problem for a class of non-Newtonian fluids. We show that the reason for this is the non-rigorous enforcement of the start-up condition in the textbook approach, which leads to a violation of the principle of causality. Nevertheless, these boundary-value problems can be solved correctly using eigenfunction expansions, and we present the formulation that makes this possible (in essence, an application of Duhamel's principle). The solutions obtained by this new approach are shown to agree identically with those obtained by using the Laplace transform in time only, a technique that enforces the proper start-up condition implicitly (hence, the same error cannot be committed). Supported, in part, by NSF Grant DMS-1104047 and the U.S. DOE (Contract No. DE-AC52-06NA25396) through the LANL/LDRD Program.

  5. From unmet clinical need to entrepreneurship: taking your informatics solution to market.

    PubMed

    Bowles, Kathryn H; Heil, Eric

    2014-01-01

    This paper will describe the process for taking a decision support solution to market as a start-up business. The nurse inventor and Co-Founder of RightCare Solutions, Inc. will share the steps from answering a clinical question, to registering an invention, creating a business plan and company, obtaining venture funding, and launching a commercial product. We will share positives about the experience such as how to get start-up funds, gaining national exposure and access to an excellent team, disseminating your work broadly, further enhancing the product, and obtaining equity, and financial rewards. We will discuss cons such as losing control, dilution of ownership, and conflict of interest. This paper will encourage nurse informaticians to think differently and learn about the steps in the process from an experienced team.

  6. Modeling of unit operating considerations in generating-capacity reliability evaluation. Volume 1. Mathematical models, computing methods, and results. Final report. [GENESIS, OPCON and OPPLAN

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patton, A.D.; Ayoub, A.K.; Singh, C.

    1982-07-01

    Existing methods for generating capacity reliability evaluation do not explicitly recognize a number of operating considerations which may have important effects in system reliability performance. Thus, current methods may yield estimates of system reliability which differ appreciably from actual observed reliability. Further, current methods offer no means of accurately studying or evaluating alternatives which may differ in one or more operating considerations. Operating considerations which are considered to be important in generating capacity reliability evaluation include: unit duty cycles as influenced by load cycle shape, reliability performance of other units, unit commitment policy, and operating reserve policy; unit start-up failuresmore » distinct from unit running failures; unit start-up times; and unit outage postponability and the management of postponable outages. A detailed Monte Carlo simulation computer model called GENESIS and two analytical models called OPCON and OPPLAN have been developed which are capable of incorporating the effects of many operating considerations including those noted above. These computer models have been used to study a variety of actual and synthetic systems and are available from EPRI. The new models are shown to produce system reliability indices which differ appreciably from index values computed using traditional models which do not recognize operating considerations.« less

  7. Plasma current start-up experiments without the central solenoid in the TST-2 spherical tokamak

    NASA Astrophysics Data System (ADS)

    Takase, Y.; Ejiri, A.; Shiraiwa, S.; Adachi, Y.; Ishii, N.; Kasahara, H.; Nuga, H.; Ono, Y.; Oosako, T.; Sasaki, M.; Shimada, Y.; Sumitomo, N.; Taguchi, I.; Tojo, H.; Tsujimura, J.; Ushigome, M.; Yamada, T.; Hanada, K.; Hasegawa, M.; Idei, H.; Nakamura, K.; Sakamoto, M.; Sasaki, K.; Sato, K. N.; Zushi, H.; Nishino, N.; Mitarai, O.

    2006-08-01

    Several techniques for initiating the plasma current without the use of the central solenoid are being developed in TST-2. While TST-2 was temporarily located at Kyushu University, two types of start-up scenarios were demonstrated. (1) A plasma current of 4 kA was generated and sustained for 0.28 s by either electron cyclotron wave or electron Bernstein wave, without induction. (2) A plasma current of 10 kA was obtained transiently by induction using only outboard poloidal field coils. In the second scenario, it is important to supply sufficient power for ionization (100 kW of EC power was sufficient in this case), since the vertical field during start-up is not adequate to maintain plasma equilibrium. In addition, electron heating experiments using the X-B mode conversion scenario were performed, and a heating efficiency of 60% was observed at a 100 kW RF power level. TST-2 is now located at the Kashiwa Campus of the University of Tokyo. Significant upgrades were made in both magnetic coil power supplies and RF systems, and plasma experiments have restarted. RF power of up to 400 kW is available in the high-harmonic fast wave frequency range around 20 MHz. Four 200 MHz transmitters are now being prepared for plasma current start-up experiments using RF power in the lower-hybrid frequency range. Preparations are in progress for a new plasma merging experiment (UTST) aimed at the formation and sustainment of ultra-high β ST plasmas.

  8. Bootstrap finance: the art of start-ups.

    PubMed

    Bhide, A

    1992-01-01

    Entrepreneurship is more popular than ever: courses are full, policymakers emphasize new ventures, managers yearn to go off on their own. Would-be founders often misplace their energies, however. Believing in a "big money" model of entrepreneurship, they spend a lot of time trying to attract investors instead of using wits and hustle to get their ideas off the ground. A study of 100 of the 1989 Inc. "500" list of fastest growing U.S. start-ups attests to the value of bootstrapping. In fact, what it takes to start a business often conflicts with what venture capitalists require. Investors prefer solid plans, well-defined markets, and track records. Entrepreneurs are heavy on energy and enthusiasm but may be short on credentials. They thrive in rapidly changing environments where uncertain prospects may scare off established companies. Rolling with the punches is often more important than formal plans. Striving to adhere to investors' criteria can diminish the flexibility--the try-it, fix-it approach--an entrepreneur needs to make a new venture work. Seven principles are basic for successful start-ups: get operational fast; look for quick break-even, cash-generating projects; offer high-value products or services that can sustain direct personal selling; don't try to hire the crack team; keep growth in check; focus on cash; and cultivate banks early. Growth and change are the start-up's natural environment. But change is also the reward for success: just as ventures grow, their founders usually have to take a fresh look at everything again: roles, organization, even the very policies that got the business up and running.

  9. 40 CFR 63.762 - Startups, shutdowns, and malfunctions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 11 2012-07-01 2012-07-01 false Startups, shutdowns, and malfunctions... Facilities § 63.762 Startups, shutdowns, and malfunctions. (a) The provisions set forth in this subpart shall apply at all times except during startups or shutdowns, during malfunctions, and during periods of non...

  10. 40 CFR 61.09 - Notification of startup.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 8 2011-07-01 2011-07-01 false Notification of startup. 61.09 Section...) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS General Provisions § 61.09 Notification of startup. (a) The owner or operator of each stationary source which has an initial startup after the effective...

  11. 40 CFR 60.3025 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What happens during periods of startup... during periods of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Model Rule—Performance...

  12. 40 CFR 60.3025 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What happens during periods of startup... during periods of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Model Rule—Performance...

  13. 40 CFR 63.762 - Startups, shutdowns, and malfunctions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Startups, shutdowns, and malfunctions... Facilities § 63.762 Startups, shutdowns, and malfunctions. (a) The provisions set forth in this subpart shall apply at all times except during startups or shutdowns, during malfunctions, and during periods of non...

  14. 40 CFR 68.77 - Pre-startup review.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 15 2011-07-01 2011-07-01 false Pre-startup review. 68.77 Section 68...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.77 Pre-startup review. (a) The owner or operator shall perform a pre-startup safety review for new stationary sources and for modified...

  15. 40 CFR 61.09 - Notification of startup.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 9 2012-07-01 2012-07-01 false Notification of startup. 61.09 Section...) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS General Provisions § 61.09 Notification of startup. (a) The owner or operator of each stationary source which has an initial startup after the effective...

  16. 40 CFR 68.77 - Pre-startup review.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 16 2013-07-01 2013-07-01 false Pre-startup review. 68.77 Section 68...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.77 Pre-startup review. (a) The owner or operator shall perform a pre-startup safety review for new stationary sources and for modified...

  17. 40 CFR 68.77 - Pre-startup review.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 16 2012-07-01 2012-07-01 false Pre-startup review. 68.77 Section 68...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.77 Pre-startup review. (a) The owner or operator shall perform a pre-startup safety review for new stationary sources and for modified...

  18. 40 CFR 63.1272 - Startups, shutdowns, and malfunctions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 11 2011-07-01 2011-07-01 false Startups, shutdowns, and malfunctions... Facilities § 63.1272 Startups, shutdowns, and malfunctions. (a) The provisions set forth in this subpart shall apply at all times except during startups or shutdowns, during malfunctions, and during periods of...

  19. 40 CFR 60.2918 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What happens during periods of startup... of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Performance Testing ...

  20. 40 CFR 60.2918 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What happens during periods of startup... of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Performance Testing ...

  1. 40 CFR 61.09 - Notification of startup.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Notification of startup. 61.09 Section...) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS General Provisions § 61.09 Notification of startup. (a) The owner or operator of each stationary source which has an initial startup after the effective...

  2. 40 CFR 68.77 - Pre-startup review.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 16 2014-07-01 2014-07-01 false Pre-startup review. 68.77 Section 68...) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.77 Pre-startup review. (a) The owner or operator shall perform a pre-startup safety review for new stationary sources and for modified...

  3. 40 CFR 60.2918 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What happens during periods of startup... of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Performance Testing ...

  4. 40 CFR 61.09 - Notification of startup.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 9 2014-07-01 2014-07-01 false Notification of startup. 61.09 Section...) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS General Provisions § 61.09 Notification of startup. (a) The owner or operator of each stationary source which has an initial startup after the effective...

  5. 40 CFR 60.3025 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What happens during periods of startup... during periods of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Model Rule—Performance...

  6. 40 CFR 60.3025 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What happens during periods of startup... during periods of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Model Rule—Performance...

  7. 40 CFR 60.3025 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What happens during periods of startup... during periods of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups, shutdowns, or malfunctions. Model Rule—Performance...

  8. 40 CFR 63.1272 - Startups, shutdowns, and malfunctions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 12 2012-07-01 2011-07-01 true Startups, shutdowns, and malfunctions... Facilities § 63.1272 Startups, shutdowns, and malfunctions. (a) The provisions set forth in this subpart shall apply at all times except during startups or shutdowns, during malfunctions, and during periods of...

  9. 40 CFR 63.762 - Startups, shutdowns, and malfunctions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 10 2011-07-01 2011-07-01 false Startups, shutdowns, and malfunctions... Facilities § 63.762 Startups, shutdowns, and malfunctions. (a) The provisions set forth in this subpart shall apply at all times except during startups or shutdowns, during malfunctions, and during periods of non...

  10. 40 CFR 61.09 - Notification of startup.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 9 2013-07-01 2013-07-01 false Notification of startup. 61.09 Section...) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS General Provisions § 61.09 Notification of startup. (a) The owner or operator of each stationary source which has an initial startup after the effective...

  11. 40 CFR 63.1272 - Startups, shutdowns, and malfunctions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Startups, shutdowns, and malfunctions... Facilities § 63.1272 Startups, shutdowns, and malfunctions. (a) The provisions set forth in this subpart shall apply at all times except during startups or shutdowns, during malfunctions, and during periods of...

  12. CONTINUOUS FLOW MICROWAVE REACTORS FOR ORGANIC SYNTHESIS: HYDRODECHLORINATION, HETROCYCLIZATION, ISOMERIZATION

    EPA Science Inventory

    Microwave heating has been sought as a convenient way of enhancing chemical processes. The advantages of microwave heating, such as selective direct heating of materials of a catalytic site, minimized fouling on hot surfaces, process simplicity, rapid startup, as well as the pos...

  13. Apel - Applied Process Engineering Laboratory

    Science.gov Websites

    startup and testing Equipment can be quickly connected to building services and effluent systems. A professional, regulated environment for bringing forth new product processes and services. Testing shortens the support Pacific Northwest National Laboratory (PNNL) scientists, engineers, and other professional staff

  14. CONTINUOUS MICROWAVE REACTORS FOR ORGANIC SYNTHESIS: HYDRODECHLORINATION AND HYDROLYSIS

    EPA Science Inventory

    Microwave heating has been sought as a convenient way of enhancing chemical processes. The advantages of microwave heating, such as selective direct heating of materials of a catalytic site, minimized fouling on hot surfaces, process simplicity, rapid startup, as well as the poss...

  15. NRU is onstream successfully at Block 31

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Looney, S.K.; Price, B.C.; Wilson, C.A.

    1986-12-17

    A nitrogen rejection facility, designed and fabricated by Koch Process Systems Inc., has exceeded design capacity and product purity specifications on Block 31 field about 30 miles south of Odessa, Tex. The unit is currently processing approximately 65 MMscfd of oil-associated gas; producing 21 MMscfd nitrogen, 32 MMscfd fuel gas, and 320,000 gal/day ethane-plus product. The startup of this nitrogen rejection facility represents the first facility for handling a feed with such a wide variation in composition. The process worked according to design and has met or exceeded product criteria. The plant is currently processing 10% over design at 78more » MMscfd (70 MMscfd net raw feed) and producing 330,000 gal/day of NGL's, with an ethane recovery of 88%. As with most startups, the main problems were with the rotating equipment items, especially the expander/compressor units. The NRF is providing a reliable source of fuel and should increase plant production and field life.« less

  16. 40 CFR 63.2861 - What reports must I submit and when?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... address of the vegetable oil production process. (3) Each listed oilseed type processed during the 12... oilseed type processed during the 12 operating months period for which you determined the deviation. (4....10(e)(3)(iii). (c) Periodic startup, shutdown, and malfunction report. If you choose to operate your...

  17. 40 CFR 63.2861 - What reports must I submit and when?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... address of the vegetable oil production process. (3) Each listed oilseed type processed during the 12... oilseed type processed during the 12 operating months period for which you determined the deviation. (4....10(e)(3)(iii). (c) Periodic startup, shutdown, and malfunction report. If you choose to operate your...

  18. Static feed water electrolysis module

    NASA Technical Reports Server (NTRS)

    Powell, J. D.; Schubert, F. H.; Jensen, F. C.

    1974-01-01

    An advanced static feed water electrolysis module (SFWEM) and associated instrumentation for generating breathable O2 was developed. The system also generates a H2 byproduct for use in an air revitalization system for O2 recovery from metabolic CO2. Special attention was given to: (1) eliminating water feed compartment degassing, (2) eliminating need for zero gravity condenser/separators, (3) increasing current density capability, and (4) providing a self contained module so that operation is independent of laboratory instrumentation and complicated startup/shutdown procedures.

  19. 78 FR 73753 - Partnerships; Start-Up Expenditures; Organization and Syndication Fees

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-09

    ... deduct start-up expenditures in the taxable year in which the active trade or business begins. The amount... begins. All start-up expenditures that relate to the active trade or business are considered in...(b) to amortize start-up expenditures for the taxable year in which the active trade or business to...

  20. 40 CFR 60.1710 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... during periods of startup, shutdown, and malfunction? 60.1710 Section 60.1710 Protection of Environment... during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or malfunction...

  1. 40 CFR 60.2953 - What information must I submit prior to initial startup?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... initial startup? 60.2953 Section 60.2953 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... and Reporting § 60.2953 What information must I submit prior to initial startup? You must submit the information specified in paragraphs (a) through (e) of this section prior to initial startup. (a) The type(s...

  2. 40 CFR Table 1 to Subpart Aaaa of... - Applicability of NESHAP General Provisions to Subpart AAAA

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... constructed, and reconstructed sources 63.6(e) Operation and maintenance requirements, startup, shutdown and... taken during a startup, shutdown and malfunction plan are consistent with the procedures in the startup, shutdown and malfunction plan, this information shall be included in a semi-annual startup, shutdown and...

  3. 40 CFR 62.15165 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... during periods of startup, shutdown, and malfunction? 62.15165 Section 62.15165 Protection of Environment... emission limits during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...

  4. 40 CFR 60.2685 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What happens during periods of startup... happens during periods of startup, shutdown, and malfunction? (a) The emission limitations and operating limits apply at all times except during CISWI unit startups, shutdowns, or malfunctions. (b) Each...

  5. 40 CFR Table 1 to Subpart Aaaa of... - Applicability of NESHAP General Provisions to Subpart AAAA

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... constructed, and reconstructed sources 63.6(e) Operation and maintenance requirements, startup, shutdown and... taken during a startup, shutdown and malfunction plan are consistent with the procedures in the startup, shutdown and malfunction plan, this information shall be included in a semi-annual startup, shutdown and...

  6. 40 CFR 60.2685 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What happens during periods of startup... happens during periods of startup, shutdown, and malfunction? (a) The emission limitations and operating limits apply at all times except during CISWI unit startups, shutdowns, or malfunctions. (b) Each...

  7. 40 CFR 60.2953 - What information must I submit prior to initial startup?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... initial startup? 60.2953 Section 60.2953 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... initial startup? You must submit the information specified in paragraphs (a) through (e) of this section prior to initial startup. (a) The type(s) of waste to be burned. (b) The maximum design waste burning...

  8. 40 CFR 60.2195 - What information must I submit prior to initial startup?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... initial startup? 60.2195 Section 60.2195 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY..., 2001 Recordkeeping and Reporting § 60.2195 What information must I submit prior to initial startup? You... startup. (a) The type(s) of waste to be burned. (b) The maximum design waste burning capacity. (c) The...

  9. 40 CFR 60.1205 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 60.1205 Section 60.1205 Protection of... requirements during periods of startup, shutdown, and malfunction? (a) The operating requirements of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...

  10. 40 CFR 62.15165 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... during periods of startup, shutdown, and malfunction? 62.15165 Section 62.15165 Protection of Environment... emission limits during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...

  11. 40 CFR 60.1205 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 60.1205 Section 60.1205 Protection of... requirements during periods of startup, shutdown, and malfunction? (a) The operating requirements of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...

  12. 40 CFR 62.15165 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... during periods of startup, shutdown, and malfunction? 62.15165 Section 62.15165 Protection of Environment... emission limits during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...

  13. 40 CFR 60.2120 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What happens during periods of startup... 1, 2001 Emission Limitations and Operating Limits § 60.2120 What happens during periods of startup... during CISWI unit startups, shutdowns, or malfunctions. (b) Each malfunction must last no longer than 3...

  14. 40 CFR 60.2953 - What information must I submit prior to initial startup?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... initial startup? 60.2953 Section 60.2953 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... initial startup? You must submit the information specified in paragraphs (a) through (e) of this section prior to initial startup. (a) The type(s) of waste to be burned. (b) The maximum design waste burning...

  15. 40 CFR 60.2953 - What information must I submit prior to initial startup?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... initial startup? 60.2953 Section 60.2953 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... initial startup? You must submit the information specified in paragraphs (a) through (e) of this section prior to initial startup. (a) The type(s) of waste to be burned. (b) The maximum design waste burning...

  16. 40 CFR 60.2918 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 7 2013-07-01 2013-07-01 false What happens during periods of startup... Emission Limitations and Operating Limits § 60.2918 What happens during periods of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups...

  17. 40 CFR 60.2685 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What happens during periods of startup...-Emission Limitations and Operating Limits § 60.2685 What happens during periods of startup, shutdown, and... startups, shutdowns, or malfunctions. (b) Each malfunction must last no longer than 3 hours. Effective Date...

  18. 40 CFR 60.1205 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 60.1205 Section 60.1205 Protection of... requirements during periods of startup, shutdown, and malfunction? (a) The operating requirements of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...

  19. 40 CFR 60.2195 - What information must I submit prior to initial startup?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... initial startup? 60.2195 Section 60.2195 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... What information must I submit prior to initial startup? You must submit the information specified in paragraphs (a) through (e) of this section prior to initial startup. (a) The type(s) of waste to be burned...

  20. 40 CFR 60.2120 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 6 2011-07-01 2011-07-01 false What happens during periods of startup... 1, 2001 Emission Limitations and Operating Limits § 60.2120 What happens during periods of startup... during CISWI unit startups, shutdowns, or malfunctions. (b) Each malfunction must last no longer than 3...

  1. 40 CFR 60.1710 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... during periods of startup, shutdown, and malfunction? 60.1710 Section 60.1710 Protection of Environment... during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or malfunction...

  2. 40 CFR 60.2120 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 7 2012-07-01 2012-07-01 false What happens during periods of startup... 1, 2001 Emission Limitations and Operating Limits § 60.2120 What happens during periods of startup... during CISWI unit startups, shutdowns, or malfunctions. (b) Each malfunction must last no longer than 3...

  3. 40 CFR 62.15165 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... during periods of startup, shutdown, and malfunction? 62.15165 Section 62.15165 Protection of Environment... emission limits during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...

  4. 40 CFR 60.1205 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 60.1205 Section 60.1205 Protection of... requirements during periods of startup, shutdown, and malfunction? (a) The operating requirements of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...

  5. 40 CFR Table 1 to Subpart Aaaa of... - Applicability of NESHAP General Provisions to Subpart AAAA

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... constructed, and reconstructed sources 63.6(e) Operation and maintenance requirements, startup, shutdown and... taken during a startup, shutdown and malfunction plan are consistent with the procedures in the startup, shutdown and malfunction plan, this information shall be included in a semi-annual startup, shutdown and...

  6. 40 CFR 60.2953 - What information must I submit prior to initial startup?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... initial startup? 60.2953 Section 60.2953 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... and Reporting § 60.2953 What information must I submit prior to initial startup? You must submit the information specified in paragraphs (a) through (e) of this section prior to initial startup. (a) The type(s...

  7. 40 CFR 62.15165 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... during periods of startup, shutdown, and malfunction? 62.15165 Section 62.15165 Protection of Environment... emission limits during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...

  8. 40 CFR 60.1205 - What happens to the operating requirements during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... requirements during periods of startup, shutdown, and malfunction? 60.1205 Section 60.1205 Protection of... requirements during periods of startup, shutdown, and malfunction? (a) The operating requirements of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or...

  9. 40 CFR 60.2195 - What information must I submit prior to initial startup?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... initial startup? 60.2195 Section 60.2195 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY..., 2001 Recordkeeping and Reporting § 60.2195 What information must I submit prior to initial startup? You... startup. (a) The type(s) of waste to be burned. (b) The maximum design waste burning capacity. (c) The...

  10. 40 CFR 60.2918 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 7 2014-07-01 2014-07-01 false What happens during periods of startup... Emission Limitations and Operating Limits § 60.2918 What happens during periods of startup, shutdown, and malfunction? The emission limitations and operating limits apply at all times except during OSWI unit startups...

  11. 40 CFR 60.1710 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... during periods of startup, shutdown, and malfunction? 60.1710 Section 60.1710 Protection of Environment... during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or malfunction...

  12. 40 CFR 60.1710 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... during periods of startup, shutdown, and malfunction? 60.1710 Section 60.1710 Protection of Environment... during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or malfunction...

  13. 40 CFR 60.1710 - What happens to the emission limits during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... during periods of startup, shutdown, and malfunction? 60.1710 Section 60.1710 Protection of Environment... during periods of startup, shutdown, and malfunction? (a) The emission limits of this subpart apply at all times except during periods of municipal waste combustion unit startup, shutdown, or malfunction...

  14. 40 CFR 60.2195 - What information must I submit prior to initial startup?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... initial startup? 60.2195 Section 60.2195 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY..., 2001 Recordkeeping and Reporting § 60.2195 What information must I submit prior to initial startup? You... startup. (a) The type(s) of waste to be burned. (b) The maximum design waste burning capacity. (c) The...

  15. 40 CFR 60.2195 - What information must I submit prior to initial startup?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... initial startup? 60.2195 Section 60.2195 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... What information must I submit prior to initial startup? You must submit the information specified in paragraphs (a) through (e) of this section prior to initial startup. (a) The type(s) of waste to be burned...

  16. 40 CFR 63.1515 - Notifications.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... startup after the effective date of this subpart and for which an application for approval of construction... major affected source that has an initial startup after the effective date of this subpart and for which...); (iii) Anticipated date of startup; and (iv) Actual date of startup. (4) As required by § 63.9(b)(5...

  17. 40 CFR 63.1515 - Notifications.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... has been reconstructed such that it is an affected source, that has an initial startup after the... source that has an initial startup after the effective date of this subpart and for which an application... startup; and (iv) Actual date of startup. (4) As required by § 63.9(b)(5), after the effective date of...

  18. 40 CFR 63.1515 - Notifications.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... startup after the effective date of this subpart and for which an application for approval of construction... major affected source that has an initial startup after the effective date of this subpart and for which...); (iii) Anticipated date of startup; and (iv) Actual date of startup. (4) As required by § 63.9(b)(5...

  19. 40 CFR 63.1515 - Notifications.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... startup after the effective date of this subpart and for which an application for approval of construction... major affected source that has an initial startup after the effective date of this subpart and for which...); (iii) Anticipated date of startup; and (iv) Actual date of startup. (4) As required by § 63.9(b)(5...

  20. Biofilm development during the start-up period of anaerobic biofilm reactors: the biofilm Archaea community is highly dependent on the support material

    PubMed Central

    Habouzit, Frédéric; Hamelin, Jérôme; Santa-Catalina, Gaëlle; Steyer, Jean-P; Bernet, Nicolas

    2014-01-01

    To evaluate the impact of the nature of the support material on its colonization by a methanogenic consortium, four substrata made of different materials: polyvinyl chloride, 2 polyethylene and polypropylene were tested during the start-up of lab-scale fixed-film reactors. The reactor performances were evaluated and compared together with the analysis of the biofilms. Biofilm growth was quantified and the structure of bacterial and archaeal communities were characterized by molecular fingerprinting profiles (capillary electrophoresis-single strand conformation polymorphism). The composition of the inoculum was shown to have a major impact on the bacterial composition of the biofilm, whatever the nature of the support material or the organic loading rate applied to the reactors during the start-up period. In contrast, the biofilm archaeal populations were independent of the inoculum used but highly dependent on the support material. Supports favouring Archaea colonization, the limiting factor in the overall process, should be preferred. PMID:24612643

  1. 40 CFR 63.5910 - What reports must I submit and when?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Standards for Hazardous Air Pollutants: Reinforced Plastic Composites Production Notifications, Reports, and... period into those that are due to startup, shutdown, control equipment problems, process problems, other...

  2. 40 CFR 63.5910 - What reports must I submit and when?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Standards for Hazardous Air Pollutants: Reinforced Plastic Composites Production Notifications, Reports, and... period into those that are due to startup, shutdown, control equipment problems, process problems, other...

  3. Adaptation of Methanogenic Inocula to Anaerobic Digestion of Maize Silage

    PubMed Central

    Wojcieszak, Martyna; Pyzik, Adam; Poszytek, Krzysztof; Krawczyk, Pawel S.; Sobczak, Adam; Lipinski, Leszek; Roubinek, Otton; Palige, Jacek; Sklodowska, Aleksandra; Drewniak, Lukasz

    2017-01-01

    A well-balanced microbial consortium is crucial for efficient biogas production. In turn, one of a major factor that influence on the structure of anaerobic digestion (AD) consortium is a source of microorganisms which are used as an inoculum. This study evaluated the influence of inoculum sources (with various origin) on adaptation of a biogas community and the efficiency of the biomethanization of maize silage. As initial inocula for AD of maize silage the samples from: (i) an agricultural biogas plant (ABP) which utilizes maize silage as a main substrate, (ii) cattle slurry (CS), which contain elevated levels of lignocelluloses materials, and (iii) raw sewage sludge (RSS) with low content of plant origin materials were used. The adaptation of methanogenic consortia was monitored during a series of passages, and the functionality of the adapted consortia was verified through start-up operation of AD in two-stage reactors. During the first stages of the adaptation phase, methanogenic consortia occurred very slowly, and only after several passages did the microbial community adapts to allow production of biogas with high methane content. The ABP consortium revealed highest biogas production in the adaptation and in the start-up process. The biodiversity dynamics monitored during adaptation and start-up process showed that community profile changed in a similar direction in three studied consortia. Native communities were very distinct to each other, while at the end of the Phase II of the start-up process microbial diversity profile was similar in all consortia. All adopted bacterial communities were dominated by representatives of Porphyromonadaceae, Rikenellaceae, Ruminococcaceae, and Synergistaceae. A shift from low acetate-preferring acetoclastic Methanosaetaceae (ABP and RSS) and/or hydrogenotrophic Archaea, e.g., Methanomicrobiaceae (CS) prevailing in the inoculum samples to larger populations of high acetate-preferring acetoclastic Methanosarcinaceae was observed by the end of the experiment. As a result, three independent, functional communities that syntrophically produced methane from acetate (primarily) and H2/CO2, methanol and methylamines were adapted. This study provides new insights into the specific process by which different inocula sampled from typical methanogenic environments that are commonly used to initiate industrial installations gradually adapted to allow biogas production from maize silage. PMID:29033919

  4. Fast start-up reactor for partial oxidation of methane with electrically-heated metallic monolith catalyst

    NASA Astrophysics Data System (ADS)

    Jung, Heon; Yoon, Wang Lai; Lee, Hotae; Park, Jong Soo; Shin, Jang Sik; La, Howon; Lee, Jong Dae

    A palladium-washcoated metallic monolith catalyst is applied to the partial oxidation of methane to syngas. This catalyst is highly active at a gas hourly space velocity (GHSV) of 100,000 h -1. The compact partial oxidation (POX) reactor equipped with both 96 cc of the metallic monolith catalyst and an electrically-heated catalyst (EHC) has a start-up time of less than 1.5 min and a syngas generation capacity of 9.5 Nm 3 h -1. The POX reaction is sustained without the need for an external heater. With the stand-alone POX reactor, the methane conversion can be increased either by preheating the reactant mixture heat-exchanged with the product gas, or by supplying a larger amount of oxygen than is necessary for the reaction stoichiometry.

  5. Turbine lubricating oil: New filtration advances save time and money

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bushar, T.

    1996-11-01

    This article describes benefits of filtration advances which include fewer forced outages, faster startups and reduced bearing wear. The importance of clean lubricating oil for turbines has been recognized for a long time, and almost all generating plants use some type of filtration system. Many older technologies and systems cannot remove enough of the contaminants to meet the needs of today`s turbines and operating conditions. Newer filtration technologies, such as multiphase filtration systems incorporating pressure coalescence filters to remove water, can reduce contaminants to levels that will help prevent unscheduled or forced outages, allow faster startups after an ongoing outage,more » and reduce wear of bearings and other components. Such preventive measures are more important than ever because of today`s increased competition and emphasis on cost control.« less

  6. Guitar Conservatory

    ERIC Educational Resources Information Center

    Marchetta, Lena C.

    2013-01-01

    What is the best way to fund the start-up of a non-profit music conservatory? Having studied with a line of great masters of music for many years, I would like to pass down the knowledge I have incurred to future generations of musicians. Although I have had many memorable teachers who were private instructors to me in the field of music, I have…

  7. A business model for diagnostic startups-a business model for a new generation of diagnostics companies.

    PubMed

    Kurtzman, Gary

    2005-10-01

    Venture capital has tended to shy away from diagnostics companies, whose products are not predicated on the blockbuster model of pharmaceuticals. But several new diagnostics companies are developing products that hold immense potential to improve healthcare delivery. Here's why venture investors should take another look at the diagnostics area.

  8. Developing physician referrals for the new physician: techniques to market your physician's practice.

    PubMed

    Schwarz, Chad; Baum, Neil

    2011-01-01

    New physicians will need to be proactive to market and promote their practices. Generating referrals from colleagues is one of the best ways to attract new patients to a start-up practice. This article will provide techniques that will help new physicians enhance their relationships with their colleagues in the community.

  9. Designing Creative Spaces for Idea Generation and Start-Up Experiments: The Role of University Ecosystems

    ERIC Educational Resources Information Center

    Curley, Martin; Formica, Piero

    2013-01-01

    The role of universities is changing. In the last century the primary focus of universities was on education and research, with the key goals of creating and diffusing information and knowledge. A third and equally important role is now emerging, with its accompanying expectations and responsibilities -- that of value creation. "Value"…

  10. 26 CFR 1.195-1T - Election to amortize start-up expenditures (temporary).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... business, or $5,000 (reduced (but not below zero) by the amount by which the start-up expenditures exceed... beginning with the month in which the active trade or business begins. All start-up expenditures that relate to the active trade or business are considered in determining whether the start-up expenditures...

  11. 30 CFR 250.1917 - What criteria for pre-startup review must be in my SEMS program?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 2 2012-07-01 2012-07-01 false What criteria for pre-startup review must be in... SHELF Safety and Environmental Management Systems (SEMS) § 250.1917 What criteria for pre-startup review...-startup safety and environmental review for new and significantly modified facilities that are subject to...

  12. 30 CFR 250.1917 - What criteria for pre-startup review must be in my SEMS program?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 2 2014-07-01 2014-07-01 false What criteria for pre-startup review must be in... SHELF Safety and Environmental Management Systems (SEMS) § 250.1917 What criteria for pre-startup review...-startup safety and environmental review for new and significantly modified facilities that are subject to...

  13. 40 CFR 62.14645 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 9 2013-07-01 2013-07-01 false What happens during periods of startup... Limits § 62.14645 What happens during periods of startup, shutdown, and malfunction? (a) The emission limitations and operating limits apply at all times except during periods of CISWI unit startup, shutdown, or...

  14. 40 CFR 62.14645 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false What happens during periods of startup... Limits § 62.14645 What happens during periods of startup, shutdown, and malfunction? (a) The emission limitations and operating limits apply at all times except during periods of CISWI unit startup, shutdown, or...

  15. 40 CFR 62.14645 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 9 2012-07-01 2012-07-01 false What happens during periods of startup... Limits § 62.14645 What happens during periods of startup, shutdown, and malfunction? (a) The emission limitations and operating limits apply at all times except during periods of CISWI unit startup, shutdown, or...

  16. 40 CFR 62.14645 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 9 2014-07-01 2014-07-01 false What happens during periods of startup... Limits § 62.14645 What happens during periods of startup, shutdown, and malfunction? (a) The emission limitations and operating limits apply at all times except during periods of CISWI unit startup, shutdown, or...

  17. 40 CFR 60.5180 - Do the emission limits, emission standards, and operating limits apply during periods of startup...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... standards, and operating limits apply during periods of startup, shutdown, and malfunction? 60.5180 Section... startup, shutdown, and malfunction? The emission limits and standards apply at all times and during... concentration limit using CO CEMS, the correction to 7 percent oxygen does not apply during periods of startup...

  18. 40 CFR 60.5180 - Do the emission limits, emission standards, and operating limits apply during periods of startup...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... standards, and operating limits apply during periods of startup, shutdown, and malfunction? 60.5180 Section... startup, shutdown, and malfunction? The emission limits and standards apply at all times and during... concentration limit using CO CEMS, the correction to 7 percent oxygen does not apply during periods of startup...

  19. 40 CFR 62.14645 - What happens during periods of startup, shutdown, and malfunction?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 8 2011-07-01 2011-07-01 false What happens during periods of startup... Limits § 62.14645 What happens during periods of startup, shutdown, and malfunction? (a) The emission limitations and operating limits apply at all times except during periods of CISWI unit startup, shutdown, or...

  20. 40 CFR 60.5180 - Do the emission limits, emission standards, and operating limits apply during periods of startup...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... standards, and operating limits apply during periods of startup, shutdown, and malfunction? 60.5180 Section... startup, shutdown, and malfunction? The emission limits and standards apply at all times and during... concentration limit using CO CEMS, the correction to 7 percent oxygen does not apply during periods of startup...

  1. 40 CFR 60.5180 - Do the emission limits, emission standards, and operating limits apply during periods of startup...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... standards, and operating limits apply during periods of startup, shutdown, and malfunction? 60.5180 Section... startup, shutdown, and malfunction? The emission limits and standards apply at all times and during... concentration limit using CO CEMS, the correction to 7 percent oxygen does not apply during periods of startup...

  2. 30 CFR 250.1917 - What criteria for pre-startup review must be in my SEMS program?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 2 2013-07-01 2013-07-01 false What criteria for pre-startup review must be in... SHELF Safety and Environmental Management Systems (SEMS) § 250.1917 What criteria for pre-startup review...-startup safety and environmental review for new and significantly modified facilities that are subject to...

  3. 40 CFR Table 4 to Subpart Eeee of... - Summary of Reporting Requirements

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... Waste management plan; and § 60.2952. v. Anticipated date of initial startup. § 60.2952. 2. Startup notification a. Prior to initial startup i. Types of waste to be burned;ii. Maximum design waste burning... petition for site-specific operating limits; and § 60.2953. v. Anticipated date of initial startup. § 60...

  4. 40 CFR Table 4 to Subpart Cccc of... - Summary of Reporting Requirements a

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... requirements • Waste management plan • Anticipated date of initial startup § 60.2190 Startup notification Prior to initial startup • Type of waste to be burned• Maximum design waste burning capacity • Anticipated... occurred during a period of startup, shutdown, or malfunction § 60.2215 and 60.2220 Qualified operator...

  5. 40 CFR Table 4 to Subpart Eeee of... - Summary of Reporting Requirements

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .... Waste management plan; and § 60.2952. v. Anticipated date of initial startup. § 60.2952. 2. Startup notification a. Prior to initial startup i. Types of waste to be burned;ii. Maximum design waste burning... petition for site-specific operating limits; and § 60.2953. v. Anticipated date of initial startup. § 60...

  6. 40 CFR Table 5 to Subpart Llll of... - Summary of Reporting Requirements for New Sewage Sludge Incineration Units a

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... Documentation for siting requirements. 4. Anticipated date of initial startup. § 60.4915(a). Notification of initial startup Prior to initial startup 1. Maximum design dry sewage sludge burning capacity2.... 4. Anticipated date of initial startup. 5. Site-specific monitoring plan. 6. The site-specific...

  7. 40 CFR Table 4 to Subpart Eeee of... - Summary of Reporting Requirements

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... Waste management plan; and § 60.2952. v. Anticipated date of initial startup. § 60.2952. 2. Startup notification a. Prior to initial startup i. Types of waste to be burned;ii. Maximum design waste burning... petition for site-specific operating limits; and § 60.2953. v. Anticipated date of initial startup. § 60...

  8. 40 CFR Table 4 to Subpart Eeee of... - Summary of Reporting Requirements

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... Waste management plan; and § 60.2952. v. Anticipated date of initial startup. § 60.2952. 2. Startup notification a. Prior to initial startup i. Types of waste to be burned;ii. Maximum design waste burning... petition for site-specific operating limits; and § 60.2953. v. Anticipated date of initial startup. § 60...

  9. 40 CFR Table 5 to Subpart Llll of... - Summary of Reporting Requirements for New Sewage Sludge Incineration Units a

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... Documentation for siting requirements. 4. Anticipated date of initial startup. § 60.4915(a). Notification of initial startup Prior to initial startup 1. Maximum design dry sewage sludge burning capacity2.... 4. Anticipated date of initial startup. 5. Site-specific monitoring plan. 6. The site-specific...

  10. 40 CFR Table 4 to Subpart Cccc of... - Summary of Reporting Requirements a

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements • Waste management plan • Anticipated date of initial startup § 60.2190 Startup notification Prior to initial startup • Type of waste to be burned• Maximum design waste burning capacity • Anticipated... occurred during a period of startup, shutdown, or malfunction § 60.2215 and 60.2220 Qualified operator...

  11. 40 CFR Table 4 to Subpart Cccc of... - Summary of Reporting Requirements a

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... requirements • Waste management plan • Anticipated date of initial startup § 60.2190 Startup notification Prior to initial startup • Type of waste to be burned• Maximum design waste burning capacity • Anticipated... occurred during a period of startup, shutdown, or malfunction § 60.2215 and 60.2220 Qualified operator...

  12. 40 CFR Table 4 to Subpart Eeee of... - Summary of Reporting Requirements

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... Waste management plan; and § 60.2952. v. Anticipated date of initial startup. § 60.2952. 2. Startup notification a. Prior to initial startup i. Types of waste to be burned;ii. Maximum design waste burning... petition for site-specific operating limits; and § 60.2953. v. Anticipated date of initial startup. § 60...

  13. Simulation Control Graphical User Interface Logging Report

    NASA Technical Reports Server (NTRS)

    Hewling, Karl B., Jr.

    2012-01-01

    One of the many tasks of my project was to revise the code of the Simulation Control Graphical User Interface (SIM GUI) to enable logging functionality to a file. I was also tasked with developing a script that directed the startup and initialization flow of the various LCS software components. This makes sure that a software component will not spin up until all the appropriate dependencies have been configured properly. Also I was able to assist hardware modelers in verifying the configuration of models after they have been upgraded to a new software version. I developed some code that analyzes the MDL files to determine if any error were generated due to the upgrade process. Another one of the projects assigned to me was supporting the End-to-End Hardware/Software Daily Tag-up meeting.

  14. A B-TOF mass spectrometer for the analysis of ions with extreme high start-up energies.

    PubMed

    Lezius, M

    2002-03-01

    Weak magnetic deflection is combined with two acceleration stage time-of-flight mass spectrometry and subsequent position-sensitive ion detection. The experimental method, called B-TOF mass spectrometry, is described with respect to its theoretical background and some experimental results. It is demonstrated that the technique has distinct advantages over other approaches, with special respect to the identification and analysis of very highly energetic ions with an initially large energy broadening (up to 1 MeV) and with high charge states (up to 30+). Similar energetic targets are a common case in intense laser-matter interaction processes found during laser ablation, laser-cluster and laser-molecule interaction and fast particle and x-ray generation from laser-heated plasma. Copyright 2002 John Wiley & Sons, Ltd.

  15. Design and assembly of a catalyst bed gas generator for the catalytic decomposition of high concentration hydrogen peroxide propellants and the catalytic combustion of hydrocarbon/air mixtures

    NASA Technical Reports Server (NTRS)

    Lohner, Kevin A. (Inventor); Mays, Jeffrey A. (Inventor); Sevener, Kathleen M. (Inventor)

    2004-01-01

    A method for designing and assembling a high performance catalyst bed gas generator for use in decomposing propellants, particularly hydrogen peroxide propellants, for use in target, space, and on-orbit propulsion systems and low-emission terrestrial power and gas generation. The gas generator utilizes a sectioned catalyst bed system, and incorporates a robust, high temperature mixed metal oxide catalyst. The gas generator requires no special preheat apparatus or special sequencing to meet start-up requirements, enabling a fast overall response time. The high performance catalyst bed gas generator system has consistently demonstrated high decomposition efficiency, extremely low decomposition roughness, and long operating life on multiple test articles.

  16. G T-Mohr Start-up Reactivity Insertion Transient Analysis Using Simulink

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fard, Mehdi Reisi; Blue, Thomas E.; Miller, Don W.

    2006-07-01

    As a part of a Department of Energy-Nuclear Engineering Research Initiative (NERI) Project, we at OSU are investigating SiC semiconductor detectors as neutron power monitors for Generation IV power reactors. As a part of this project, we are investigating the power monitoring requirements for a specific type of Generation IV reactor, namely the GT-MHR. To evaluate the power monitoring requirements for the GT-MHR that are most demanding for a SiC diode power monitor, we have developed a Simulink model to study the transient behavior of the GT-MHR. In this paper, we describe the application of the Simulink code to themore » analysis of a series of Start-up Reactivity Insertion Transients (SURITs). The SURIT is considered to be a limiting protectable accident in terms of establishing the dynamic range of a SiC power monitor because of the low count rate of the detector during the start-up and absence of the reactivity feedback mechanism at the beginning of transient. The SURIT is studied with the ultimate goal of identifying combinations of 1) reactor power scram setpoints and 2) cram initiation times (the time in which a scram must be initiated once the setpoint is exceeded) for which the GT-MHR core is protected in the event of a continuous withdrawal of a control rod bank from the core from low powers. The SURIT is initiated by withdrawing a rod bank when the reactor is cold (300 K) and sub-critical at the BOEC (Beginning of Equilibrium Cycle) condition. Various initial power levels have been considered corresponding to various degrees of sub-criticality and various source strengths. An envelope of response is determined to establish which initial powers correspond to the worst case SURIT. (authors)« less

  17. STARTUP REACTIVITY ACCOUNTABILITY ATTRIBUTED TO ISOTOPIC TRANSMUTATIONS IN THE IRRADIATED BERYLLIUM REFLECTOR OF THE HIGH FLUX ISTOTOPE REACTOR

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chandler, David; Maldonado, G Ivan; Primm, Trent

    2010-01-01

    The objective of this study is to develop a methodology to predict the reactivity impact as a function of outage time between cycles of 3He, 6Li, and other poisons in the High Flux Isotope Reactor s (HFIR) beryllium reflector. The reactivity worth at startup of the HFIR has been incorrectly predicted in the past after the reactor has been shut-down for long periods of time. The incorrect prediction was postulated to be due to the erroneous calculation of 3He buildup in the beryllium reflector. It is necessary to develop a better estimate of the start-of-cycle symmetric critical control element positionsmore » since if the estimated and actual symmetrical critical control element positions differ by more than $1.55 in reactivity (approximately one-half inch in control element startup position), HFIR is to be shutdown and a technical evaluation is performed to resolve the discrepancy prior to restart. 3He is generated and depleted during operation, but during an outage, the depletion of 3He ceases because it is a stable isotope. 3He is born from the radioactive decay of tritium, and thus the concentration of 3He increases during shutdown. The computer program SCALE, specifically the TRITON and CSAS5 control modules including the KENO V.A, COUPLE, and ORIGEN functional modules were utilized in this study. An equation relating the down time (td) to the change in symmetric control element position was generated and validated against measurements for approximately 40 HFIR operating cycles. The newly-derived correlation was shown to improve accuracy of predictions for long periods of down time.« less

  18. Results from CrIS-ATMS Obtained Using the AIRS Science Team Retrieval Methodology

    NASA Technical Reports Server (NTRS)

    Susskind, Joel; Kouvaris, Louis C.; Iredell, Lena

    2013-01-01

    AIRS was launched on EOS Aqua in May 2002, together with AMSU-A and HSB (which subsequently failed early in the mission), to form a next generation polar orbiting infrared and microwave atmospheric sounding system. AIRS/AMSU had two primary objectives. The first objective was to provide real-time data products available for use by the operational Numerical Weather Prediction Centers in a data assimilation mode to improve the skill of their subsequent forecasts. The second objective was to provide accurate unbiased sounding products with good spatial coverage that are used to generate stable multi-year climate data sets to study the earth's interannual variability, climate processes, and possibly long-term trends. AIRS/AMSU data for all time periods are now being processed using the state of the art AIRS Science Team Version-6 retrieval methodology. The Suomi-NPP mission was launched in October 2011 as part of a sequence of Low Earth Orbiting satellite missions under the "Joint Polar Satellite System" (JPSS). NPP carries CrIS and ATMS, which are advanced infra-red and microwave atmospheric sounders that were designed as follow-ons to the AIRS and AMSU instruments. The main objective of this work is to assess whether CrIS/ATMS will be an adequate replacement for AIRS/AMSU from the perspective of the generation of accurate and consistent long term climate data records, or if improved instruments should be developed for future flight. It is critical for CrIS/ATMS to be processed using an algorithm similar to, or at least comparable to, AIRS Version-6 before such an assessment can be made. We have been conducting research to optimize products derived from CrIS/ATMS observations using a scientific approach analogous to the AIRS Version-6 retrieval algorithm. Our latest research uses Version-5.70 of the CrIS/ATMS retrieval algorithm, which is otherwise analogous to AIRS Version-6, but does not yet contain the benefit of use of a Neural-Net first guess start-up system which significantly improved results of AIRS Version-6. Version-5.70 CrIS/ATMS temperature profile and surface skin temperature retrievals are of very good quality, and are better than AIRS Version-5 retrievals, but are still significantly poorer than those of AIRS Version-6. CrIS/ATMS retrievals should improve when a Neural-Net start-up system is ready for use. We also examined CrIS/ATMS retrievals generated by NOAA using their NUCAPS retrieval algorithm, which is based on earlier versions of the AIRS Science Team retrieval algorithms. We show that the NUCAPS algorithm as currently configured is not well suited for climate monitoring purposes.

  19. Fast start-up of the CANON process with a SABF and the effects of pH and temperature on nitrogen removal and microbial activity.

    PubMed

    Yue, Xiu; Yu, Guangping; Liu, Zhuhan; Tang, Jiali; Liu, Jian

    2018-04-01

    The long start-up time of the completely autotrophic nitrogen removal over nitrite (CANON) process is one of the main disadvantages of this system. In this paper, the CANON process with a submerged aerated biological filter (SABF) was rapidly started up within 26 days. It gave an average ammonium nitrogen removal rate (ANR) and a total nitrogen removal rate (TNR) of 94.2% and 81.3%, respectively. The phyla Proteobacteria and Planctomycetes were confirmed as the ammonia oxidizing bacteria (AOB) and anaerobic ammonium oxidation bacteria (AnAOB). The genus Candidatus Brocadia was the major contributor of nitrogen removal. pH and temperature affect the performance of the CANON process. This experimental results showed that the optimum pH and temperature were 8.0 and 30 °C, respectively, which gave the highest average ANR and TNR values of 94.6% and 85.1%, respectively. This research could promote the nitrogen removal ability of CANON process in the future. Copyright © 2018 Elsevier Ltd. All rights reserved.

  20. 77 FR 34460 - Proposed Collection; Comment Request for Form 14411

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... problems may pertain to experiences with the Internal Revenue Service's processes procedures or make...) estimates of capital or start-up costs and costs of operation, maintenance, and purchase of services to...

  1. From Unmet Clinical Need to Entrepreneurship: Taking Your Informatics Solution to Market

    PubMed Central

    Bowles, Kathryn H.; Heil, Eric

    2015-01-01

    This paper will describe the process for taking a decision support solution to market as a start-up business. The nurse inventor and Co-Founder of RightCare Solutions, Inc. will share the steps from answering a clinical question, to registering an invention, creating a business plan and company, obtaining venture funding, and launching a commercial product. We will share positives about the experience such as how to get start-up funds, gaining national exposure and access to an excellent team, disseminating your work broadly, further enhancing the product, and obtaining equity, and financial rewards. We will discuss cons such as losing control, dilution of ownership, and conflict of interest. This paper will encourage nurse informaticians to think differently and learn about the steps in the process from an experienced team. PMID:24943561

  2. Theoretical analysis of oxygen diffusion at startup in an alkali metal heat pipe with gettered alloy walls

    NASA Technical Reports Server (NTRS)

    Tower, L. K.

    1973-01-01

    The diffusion of oxygen into, or out of, a gettered alloy exposed to oxygenated alkali liquid metal coolant, a situation arising in some high temperature heat transfer systems, was analyzed. The relation between the diffusion process and the thermochemistry of oxygen in the alloy and in the alkali metal was developed by making several simplifying assumptions. The treatment is therefore theoretical in nature. However, a practical example pertaining to the startup of a heat pipe with walls of T-111, a tantalum alloy, and lithium working fluid illustrates the use of the figures contained in the analysis.

  3. Vapor Flow Patterns During a Start-Up Transient in Heat Pipes

    NASA Technical Reports Server (NTRS)

    Issacci, F.; Ghoniem, N, M.; Catton, I.

    1996-01-01

    The vapor flow patterns in heat pipes are examined during the start-up transient phase. The vapor core is modelled as a channel flow using a two dimensional compressible flow model. A nonlinear filtering technique is used as a post process to eliminate the non-physical oscillations of the flow variables. For high-input heat flux, multiple shock reflections are observed in the evaporation region. The reflections cause a reverse flow in the evaporation and circulations in the adiabatic region. Furthermore, each shock reflection causes a significant increase in the local pressure and a large pressure drop along the heat pipe.

  4. Simulation of a Start-Up Manufacturing Facility for Nanopore Arrays

    ERIC Educational Resources Information Center

    Field, Dennis W.

    2009-01-01

    Simulation is a powerful tool in developing and troubleshooting manufacturing processes, particularly when considering process flows for manufacturing systems that do not yet exist. Simulation can bridge the gap in terms of setting up full-scale manufacturing for nanotechnology products if limited production experience is an issue. An effective…

  5. Facultative Lagoons. Student Manual. Biological Treatment Process Control.

    ERIC Educational Resources Information Center

    Andersen, Lorri

    The textual material for a unit on facultative lagoons is presented in this student manual. Topic areas discussed include: (1) loading; (2) microbial theory; (3) structure and design; (4) process control; (5) lagoon start-up; (6) data handling and analysis; (7) lagoon maintenance (considering visual observations, pond structure, safety, odor,…

  6. SOP 98-5 brings uniformity to reporting start-up costs.

    PubMed

    Luecke, R W; Meeting, D T

    1999-08-01

    The American Institute of Certified Public Accountants (AICPA) issued Statement of Position (SOP) No. 98-5, Reporting on the Costs of Start-Up Activities, in April 1998 to provide organizations with guidance on how to report start-up and organization costs. Because some companies were expensing start-up costs while other companies were capitalizing start-up costs with a variety of periods over which to amortize costs, it was difficult to compare companies' financial statements. SOP No. 98-5 will bring uniformity to the treatment of start-up and organization costs by dictating that these costs be expensed as incurred. AICPA's Accounting Standards Executive Committee adopted an intentionally broad definition of start-up costs to capture the vast majority of costs associated with starting up an organization. SOP No. 98-5 takes effect for financial statements for fiscal years beginning after December 15, 1998, but can be applied earlier for fiscal years for which financial statements have not been issued.

  7. Formation and removal of PCDD/Fs in a municipal waste incinerator during different operating periods.

    PubMed

    Wang, Hou Chuan; Hwang, Jyh Feng; Chi, Kai Hsien; Chang, Moo Been

    2007-04-01

    The PCDD/F concentrations and removal efficiencies achieved with air pollution control devices (APCDs) during different operating periods (start-up, normal operation, and shut-down) at an existing municipal waste incinerator (MWI) in Taiwan are evaluated via stack sampling and analysis. The MWI investigated is equipped with electrostatic precipitators (EP), wet scrubbers (WS), and selective catalytic reduction system (SCR) as APCDs. The sampling results indicate that the PCDD/F concentrations at the EP inlet during start-up period were 15 times higher than that measured during normal operation period. The PCDD/F concentration observed at shut-down period was close to that measured at normal operation period. The CO concentration was between 400 and 1000 ppm during start-up period, which was about 50 times higher compared with the normal operation. Hence, combustion condition significantly affected the PCDD/F formation concentration during the waste incineration process. In addition, the distributions of the PCDD/F congeners were similar at different operating periods. During the normal operation and shut-down periods, the EP decreases the PCDD/F concentration (based on TEQ) by 18.4-48.6%, while the removal efficiency of PCDD/Fs achieved with SCR system reaches 99.3-99.6%. Nevertheless, the PCDD/F removal efficiency achieved with SCR was only 42% during the 19-h start-up period due to the low SCR operating temperature (195 degrees C).

  8. Gazelles, unicorns, and dragons battle cancer through the Nanotechnology Startup Challenge.

    PubMed

    Truman, Rosemarie; Locke, Cody J

    On March 4th, 2016, Springer's C ancer Nanotechnology office promoted the launch of the Nanotechnology Startup Challenge in Cancer ( NSC 2 ). This innovation-development model is a partnership among our company, the Center for Advancing Innovation (CAI), MedImmune, the global biologics arm of AstraZeneca, and multiple institutes at the National Institutes of Health (NIH). NSC 2 "crowdsources" talent from around the world to launch startups with near-term, commercially viable cancer nanotechnology inventions, which were developed by the National Cancer Institute (NCI), the National Heart, Lung and Blood Institute (NHLBI), and the National Institute of Biomedical Imaging and Bioengineering (NIBIB). Crowdsourcing is a process in which one uses the internet to engage a large group of people in an activity, such as NSC 2 . For this initiative, CAI engaged universities, industry professionals, foundations, investors, relevant media outlets, seasoned entrepreneurs, and life sciences membership organizations to request that they participate in the challenge. From this outreach, fifty-six key thought leaders have enrolled in NSC 2 as judges, mentors, and/or advisors to challenge teams (http://www.nscsquared.org/judges.html). Along with crowdsourcing talent to bolt startups around NIH inventions, NSC 2 will also catalyze the launch of companies around "third-party" cancer nanotechnology inventions, which were conceived and developed outside of the NIH. Twenty-eight robust teams were accepted to the challenge on March 14th, 2016.

  9. 40 CFR Table 2a to Subpart Zzzz of... - Emission Limitations for New and Reconstructed 2SLB and Compression Ignition Stationary RICE >500...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... meet the following emission limitation, except during periods of startup . . . During periods of startup you must . . . 1. 2SLB stationary RICE a. Reduce CO emissions by 58 percent or more; orb. Limit... time spent at idle and minimize the engine's startup time at startup to a period needed for appropriate...

  10. 40 CFR Table 2a to Subpart Zzzz of... - Emission Limitations for New and Reconstructed 2SLB and Compression Ignition Stationary RICE >500...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... meet the following emission limitation, except during periods of startup . . . During periods of startup you must . . . 1. 2SLB stationary RICE a. Reduce CO emissions by 58 percent or more; orb. Limit... time spent at idle and minimize the engine's startup time at startup to a period needed for appropriate...

  11. 40 CFR Table 2a to Subpart Zzzz of... - Emission Limitations for New and Reconstructed 2SLB and Compression Ignition Stationary RICE >500...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... meet the following emission limitation, except during periods of startup . . . During periods of startup you must . . . 1. 2SLB stationary RICE a. Reduce CO emissions by 58 percent or more; orb. Limit... time spent at idle and minimize the engine's startup time at startup to a period needed for appropriate...

  12. 40 CFR 65.167 - Other reports.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... FEDERAL AIR RULE Closed Vent Systems, Control Devices, and Routing to a Fuel Gas System or a Process § 65... reporting and shall include a description of any changes made to the closed vent system. (b) Startup...

  13. A Business Model for Diagnostic Startups-A Business Model for a New Generation Of Diagnostics Companies

    PubMed Central

    Kurtzman, Gary

    2005-01-01

    Venture capital has tended to shy away from diagnostics companies, whose products are not predicated on the blockbuster model of pharmaceuticals. But several new diagnostics companies are developing products that hold immense potential to improve healthcare delivery. Here’s why venture investors should take another look at the diagnostics area. PMID:23424311

  14. Electron cyclotron plasma startup in the GDT experiment

    NASA Astrophysics Data System (ADS)

    Yakovlev, D. V.; Shalashov, A. G.; Gospodchikov, E. D.; Solomakhin, A. L.; Savkin, V. Ya.; Bagryansky, P. A.

    2017-01-01

    We report on a new plasma startup scenario in the gas dynamic trap (GDT) magnetic mirror device. The primary 5 MW neutral beam injection (NBI) plasma heating system fires into a sufficiently dense plasma target (‘seed plasma’), which is commonly supplied by an arc plasma generator. In the reported experiments, a different approach to seed plasma generation is explored. One of the channels of the electron cyclotron resonance (ECR) heating system is used to ionize the neutral gas and build up the density of plasma to a level suitable for NBI capture. After a short transition of approximately 1 ms the discharge becomes essentially similar to a standard one initiated by the plasma gun. This paper presents the discharge scenario and experimental data on the seed plasma evolution during ECRH, along with the dependencies on incident microwave power, magnetic configuration and pressure of a neutral gas. The characteristics of the consequent high-power NBI discharge are studied and differences from the conventional scenario are discussed. A theoretical model describing the ECR breakdown and the seed plasma accumulation in a large-scale mirror trap is developed on the basis of the GDT experiment.

  15. Biological capacitance studies of anodes in microbial fuel cells using electrochemical impedance spectroscopy.

    PubMed

    Lu, Zhihao; Girguis, Peter; Liang, Peng; Shi, Haifeng; Huang, Guangtuan; Cai, Lankun; Zhang, Lehua

    2015-07-01

    It is known that cell potential increases while anode resistance decreases during the start-up of microbial fuel cells (MFCs). Biological capacitance, defined as the apparent capacitance attributed to biological activity including biofilm production, plays a role in this phenomenon. In this research, electrochemical impedance spectroscopy was employed to study anode capacitance and resistance during the start-up period of MFCs so that the role of biological capacitance was revealed in electricity generation by MFCs. It was observed that the anode capacitance ranged from 3.29 to 120 mF which increased by 16.8% to 18-20 times over 10-12 days. Notably, lowering the temperature and arresting biological activity via fixation by 4% para formaldehyde resulted in the decrease of biological capacitance by 16.9 and 62.6%, indicating a negative correlation between anode capacitance and anode resistance of MFCs. Thus, biological capacitance of anode should play an important role in power generation by MFCs. We suggest that MFCs are not only biological reactors and/or electrochemical cells, but also biological capacitors, extending the vision on mechanism exploration of electron transfer, reactor structure design and electrode materials development of MFCs.

  16. Start-Up Entrepreneurs and University Students in a Co-Learning Mode: Learning Effects of a Collaborative Entrepreneurial Coaching Programme

    ERIC Educational Resources Information Center

    Saukkonen, Juha; Nukari, Jussi; Ballard, Sharon; Levie, Jonathan

    2016-01-01

    Start-up companies have been recognized as key drivers of wealth and job creation. Many students now in universities will therefore find their future employment in start-up companies, or will found them. Success in the start-up environment requires a specific set of skills. There is a growing supply of university education for new venture creation…

  17. A Guide for Developing Standard Operating Job Procedures for the Grit Removal Process Wastewater Treatment Facility. SOJP No. 2.

    ERIC Educational Resources Information Center

    Deal, Gerald A.; Montgomery, James A.

    This guide describes standard operating job procedures for the grit removal process of wastewater treatment plants. Step-by-step instructions are given for pre-start up inspection, start-up, continuous operation, and shut-down procedures. A description of the equipment used in the process is given. Some theoretical material is presented. (BB)

  18. A Guide for Developing Standard Operating Job Procedures for the Tertiary Multimedia Filtration Process Wastewater Treatment Facility. SOJP No. 7.

    ERIC Educational Resources Information Center

    Petrasek, Al, Jr.

    This guide describes the standard operating job procedures for the tertiary multimedia filtration process of wastewater treatment plants. The major objective of the filtration process is the removal of suspended solids from the reclaimed wastewater. The guide gives step-by-step instructions for pre-start up, start-up, continuous operation, and…

  19. Characteristics of adapted hydrogenotrophic community during biomethanation.

    PubMed

    Rachbauer, Lydia; Beyer, Reinhard; Bochmann, Günther; Fuchs, Werner

    2017-10-01

    The results presented in this study were carried out as concomitant experiments during the start-up and operation of a biomethanation unit to evaluate the effect of process parameters on carbon conversion, product formation (methane and acetate) and community composition. For that, two different samples were withdrawn from a trickle-bed reactor with immobilized enrichment culture of hydrogenotrophic methanogens adapted from sewage sludge. One sample was taken from the recirculation liquid during start-up phase while the other was withdrawn directly from the carrier material in the reactor. Elevated acid levels especially during start-up were shown to affect the overall carbon conversion. This effect was also seen during the acid tolerance testing reported here. Final acid concentrations of 1.6±0.3g/L resulted in a reduced conversion ratio of only 46%. Without acid addition complete conversion of CO 2 in the headspace was achieved. However, maximum methane production of 0.55±0.02mmol after 4days of incubation was monitored at moderate initial acetate concentration of 0.4g/L. In both analyzed inoculation materials Methanobacterium species were by far the most dominant Archaea with 21.8% in the recirculation liquid during start-up and 84.8% in the enrichment culture immobilized on the carrier material. The microbial composition of the two analyzed samples is in accordance with the results obtained for the carbon conversion and product formation. With approximately 50% of Bacteroidetes and Firmicutes present during reactor start-up the acetic acid production significantly contributed to the overall carbon conversion. In contrast, methane was produced almost exclusively in trials representing continuous operation where acetogenic bacteria accounted only up to 17.5%. In summary, the acid accumulation monitored during reactor start-up of a biomethanation unit is most likely to result from the microbial composition present. Nevertheless, complete adaptation to hydrogenotrophic conditions was proven to alter the consortium and yield methane as main product alongside high carbon conversion of up to 70.5±1.8%. Copyright © 2017 Elsevier B.V. All rights reserved.

  20. Successful hydraulic strategies to start up OLAND sequencing batch reactors at lab scale.

    PubMed

    Schaubroeck, Thomas; Bagchi, Samik; De Clippeleir, Haydée; Carballa, Marta; Verstraete, Willy; Vlaeminck, Siegfried E

    2012-05-01

    Oxygen-limited autotrophic nitrification/denitrification (OLAND) is a one-stage combination of partial nitritation and anammox, which can have a challenging process start-up. In this study, start-up strategies were tested for sequencing batch reactors (SBR), varying hydraulic parameters, i.e. volumetric exchange ratio (VER) and feeding regime, and salinity. Two sequential tests with two parallel SBR were performed, and stable removal rates > 0.4 g N l(-1) day(-1) with minimal nitrite and nitrate accumulation were considered a successful start-up. SBR A and B were operated at 50% VER with 3 g NaCl l(-1) in the influent, and the influent was fed over 8% and 82% of the cycle time respectively. SBR B started up in 24 days, but SBR A achieved no start-up in 39 days. SBR C and D were fed over 65% of the cycle time at 25% VER, and salt was added only to the influent of SBR D (5 g NaCl l(-1)). Start-up of both SBR C and D was successful in 9 and 32 days respectively. Reactor D developed a higher proportion of small aggregates (0.10-0.25 mm), with a high nitritation to anammox rate ratio, likely the cause of the observed nitrite accumulation. The latter was overcome by temporarily including an anoxic period at the end of the reaction phase. All systems achieved granulation and similar biomass-specific nitrogen removal rates (141-220 mg N g(-1) VSS day(-1)). FISH revealed a close juxtapositioning of aerobic and anoxic ammonium-oxidizing bacteria (AerAOB and AnAOB), also in small aggregates. DGGE showed that AerAOB communities had a lower evenness than Planctomycetes communities. A higher richness of the latter seemed to be correlated with better reactor performance. Overall, the fast start-up of SBR B, C and D suggests that stable hydraulic conditions are beneficial for OLAND while increased salinity at the tested levels is not needed for good reactor performance. © 2012 The Authors. Microbial Biotechnology © 2012 Society for Applied Microbiology and Blackwell Publishing Ltd.

  1. Method for operating a combustor in a fuel cell system

    DOEpatents

    Clingerman, Bruce J.; Mowery, Kenneth D.

    2002-01-01

    In one aspect, the invention provides a method of operating a combustor to heat a fuel processor to a desired temperature in a fuel cell system, wherein the fuel processor generates hydrogen (H.sub.2) from a hydrocarbon for reaction within a fuel cell to generate electricity. More particularly, the invention provides a method and select system design features which cooperate to provide a start up mode of operation and a smooth transition from start-up of the combustor and fuel processor to a running mode.

  2. Contributions from space technology to central power generation

    NASA Technical Reports Server (NTRS)

    Dicks, J. B., Jr.

    1972-01-01

    The central power crisis, and the present and relatively near-time contributions that aerospace technology is making to help solve this crisis are discussed. The principal emphasis is placed on the prospects of aerospace derived magnetohydrodynamic (MHD) large scale power generation. The strides that the Soviet Union is making in this field with the startup of the new U-25 plant near Moscow, having a total power capability of 75 MW, are reviewed. A much smaller program in the U.S. is outlined, and prospects of future benefits are discussed.

  3. 40 CFR 63.1360 - Applicability.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... vessel and does not have an intervening storage vessel. If two or more PAI process units have the same.... If two or more PAI process units have the same input to or output from the storage vessel in the tank... hours during the calendar year. (e) Applicability of this subpart except during periods of startup...

  4. 40 CFR 63.1360 - Applicability.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... vessel and does not have an intervening storage vessel. If two or more PAI process units have the same.... If two or more PAI process units have the same input to or output from the storage vessel in the tank... hours during the calendar year. (e) Applicability of this subpart except during periods of startup...

  5. 40 CFR 63.2450 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... values are available for at least two of the 15-minute periods during an hour when calibration, quality... during periods of startup, shutdown, and malfunction (SSM), and you must meet the requirements specified...., continuous process vents, batch process vents, storage tanks, transfer operations, and waste management units...

  6. 40 CFR 63.2450 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... values are available for at least two of the 15-minute periods during an hour when calibration, quality..., except during periods of startup, shutdown, and malfunction (SSM), and you must meet the requirements...., continuous process vents, batch process vents, storage tanks, transfer operations, and waste management units...

  7. 40 CFR 63.1360 - Applicability.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... vessel and does not have an intervening storage vessel. If two or more PAI process units have the same.... If two or more PAI process units have the same input to or output from the storage vessel in the tank... hours during the calendar year. (e) Applicability of this subpart except during periods of startup...

  8. 40 CFR 63.1360 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... vessel and does not have an intervening storage vessel. If two or more PAI process units have the same.... If two or more PAI process units have the same input to or output from the storage vessel in the tank... hours during the calendar year. (e) Applicability of this subpart except during periods of startup...

  9. 40 CFR 63.2840 - What emission requirements must I meet?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... entire calendar month in which the source operated under an initial startup period subject to § 63.2850(c... operating months, as determined in § 63.2853. Oilseed = Tons of each oilseed type “i” processed during the... Loss Factors for Determining Allowable HAP Loss Type of oilseed process A source that... Oilseed...

  10. 40 CFR 63.2840 - What emission requirements must I meet?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... entire calendar month in which the source operated under an initial startup period subject to § 63.2850(c... operating months, as determined in § 63.2853. Oilseed = Tons of each oilseed type “i” processed during the... Loss Factors for Determining Allowable HAP Loss Type of oilseed process A source that... Oilseed...

  11. 40 CFR 63.2840 - What emission requirements must I meet?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... entire calendar month in which the source operated under an initial startup period subject to § 63.2850(c... operating months, as determined in § 63.2853. Oilseed = Tons of each oilseed type “i” processed during the... Loss Factors for Determining Allowable HAP Loss Type of oilseed process A source that... Oilseed...

  12. Experiential Internships: Understanding the Process of Student Learning in Small Business Internships

    ERIC Educational Resources Information Center

    Varghese, Mary E.; Parker, Loran Carleton; Adedokun, Omolola; Shively, Monica; Burgess, Wilella; Childress, Amy; Bessenbacher, Ann

    2012-01-01

    This qualitative study examines the process of student learning in a small-business experiential internship programme that pairs highly qualified undergraduates with local small or start-up companies. The Cognitive Apprenticeship model developed by Collins et al (1991) was used to conceptualize students' reported experiences. The results revealed…

  13. Virtual School Startups: Founder Processes in American K-12 Public Virtual Schools

    ERIC Educational Resources Information Center

    Taylor, Brett D.; McNair, Delores E.

    2018-01-01

    Traditional school districts do not have a lot of experience with virtual schools and have lost students to state and charter virtual schools. To retain students and offer alternative learning opportunities, more public districts are starting their own virtual schools. This study was an examination of foundational processes at three California…

  14. Comparison of start-up strategies and process performance during semi-continuous anaerobic digestion of sugarcane filter cake co-digested with bagasse.

    PubMed

    Janke, Leandro; Leite, Athaydes F; Nikolausz, Marcell; Radetski, Claudemir M; Nelles, Michael; Stinner, Walter

    2016-02-01

    The anaerobic digestion of sugarcane filter cake and the option of co-digestion with bagasse were investigated in a semi-continuous feeding regime to assess the main parameters used for large-scale process designing. Moreover, fresh cattle manure was considered as alternative inoculum for the start-up of biogas reactors in cases where digestate from a biogas plant would not be available in remote rural areas. Experiments were carried out in 6 lab-scale semi-continuous stirred-tank reactors at mesophilic conditions (38±1°C) while the main anaerobic digestion process parameters monitored. Fresh cattle manure demonstrated to be appropriate for the start-up process. However, an acclimation period was required due to the high initial volatile fatty acids concentration (8.5gL(-1)). Regardless the mono-digestion of filter cake presented 50% higher biogas yield (480mLgVS(-1)) than co-digestion with bagasse (320mLgVS(-1)) during steady state conditions. A large-scale co-digestion system would produce 58% more biogas (1008m(3)h(-1)) than mono-digestion of filter cake (634m(3)h(-1)) due to its higher biomass availability for biogas conversion. Considering that the biogas production rate was the technical parameter that displayed the most relevant differences between the analyzed substrate options (0.99-1.45m(3)biogasm(3)d(-1)). The decision of which substrate option should be implemented in practice would be mainly driven by the available construction techniques, since economically efficient tanks could compensate the lower biogas production rate of co-digestion option. Copyright © 2015 Elsevier Ltd. All rights reserved.

  15. 12 CFR 975.1 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... includes furniture and equipment, leasehold improvements, and capitalized start-up costs. Data communication means transmitting and receiving of data to or from Banks, Federal Reserve offices, clearinghouse... for delivery of information; and telephone inquiry service. Data processing includes capture, storage...

  16. 12 CFR 975.1 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... includes furniture and equipment, leasehold improvements, and capitalized start-up costs. Data communication means transmitting and receiving of data to or from Banks, Federal Reserve offices, clearinghouse... for delivery of information; and telephone inquiry service. Data processing includes capture, storage...

  17. 12 CFR 975.1 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... includes furniture and equipment, leasehold improvements, and capitalized start-up costs. Data communication means transmitting and receiving of data to or from Banks, Federal Reserve offices, clearinghouse... for delivery of information; and telephone inquiry service. Data processing includes capture, storage...

  18. 12 CFR 975.1 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... includes furniture and equipment, leasehold improvements, and capitalized start-up costs. Data communication means transmitting and receiving of data to or from Banks, Federal Reserve offices, clearinghouse... for delivery of information; and telephone inquiry service. Data processing includes capture, storage...

  19. 40 CFR 63.403 - Compliance dates.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... compliance date shall be 18 months after September 8, 1994. (b) For new IPCT's that have an initial startup... initial startup on or after September 8, 1994, the compliance date shall be the date of the initial startup. ...

  20. 40 CFR 63.403 - Compliance dates.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... compliance date shall be 18 months after September 8, 1994. (b) For new IPCT's that have an initial startup... initial startup on or after September 8, 1994, the compliance date shall be the date of the initial startup. ...

  1. Startup analysis for a high temperature gas loaded heat pipe

    NASA Technical Reports Server (NTRS)

    Sockol, P. M.

    1973-01-01

    A model for the rapid startup of a high-temperature gas-loaded heat pipe is presented. A two-dimensional diffusion analysis is used to determine the rate of energy transport by the vapor between the hot and cold zones of the pipe. The vapor transport rate is then incorporated in a simple thermal model of the startup of a radiation-cooled heat pipe. Numerical results for an argon-lithium system show that radial diffusion to the cold wall can produce large vapor flow rates during a rapid startup. The results also show that startup is not initiated until the vapor pressure p sub v in the hot zone reaches a precise value proportional to the initial gas pressure p sub i. Through proper choice of p sub i, startup can be delayed until p sub v is large enough to support a heat-transfer rate sufficient to overcome a thermal load on the heat pipe.

  2. The physics of tokamak start-up

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mueller, D.

    Tokamak start-up on present-day devices usually relies on inductively induced voltage from a central solenoid. In some cases, inductive startup is assisted with auxiliary power from electron cyclotron radio frequency heating. International Thermonuclear Experimental Reactor, the National Spherical Torus Experiment Upgrade and JT60, now under construction, will make use of the understanding gained from present-day devices to ensure successful start-up. Design of a spherical tokamak (ST) with DT capability for nuclear component testing would require an alternative to a central solenoid because the small central column in an ST has insufficient space to provide shielding for the insulators in themore » solenoid. Alternative start-up techniques such as induction using outer poloidal field coils, electron Bernstein wave start-up, coaxial helicity injection, and point source helicity injection have been used with success, but require demonstration of scaling to higher plasma current.« less

  3. Methanol-Independent Protein Expression by AOX1 Promoter with trans-Acting Elements Engineering and Glucose-Glycerol-Shift Induction in Pichia pastoris

    PubMed Central

    Wang, Jinjia; Wang, Xiaolong; Shi, Lei; Qi, Fei; Zhang, Ping; Zhang, Yuanxing; Zhou, Xiangshan; Song, Zhiwei; Cai, Menghao

    2017-01-01

    The alcohol oxidase 1 promoter (PAOX1) of Pichia pastoris is commonly used for high level expression of recombinant proteins. While the safety risk of methanol and tough process control for methanol induction usually cause problems especially in large-scale fermentation. By testing the functions of trans-acting elements of PAOX1 and combinatorially engineering of them, we successfully constructed a methanol-free PAOX1 start-up strain, in which, three transcription repressors were identified and deleted and, one transcription activator were overexpressed. The strain expressed 77% GFP levels in glycerol compared to the wide-type in methanol. Then, insulin precursor (IP) was expressed, taking which as a model, we developed a novel glucose-glycerol-shift induced PAOX1 start-up for this methanol-free strain. A batch phase with glucose of 40 g/L followed by controlling residual glucose not lower than 20 g/L was compatible for supporting cell growth and suppressing PAOX1. Then, glycerol induction was started after glucose used up. Accordingly, an optimal bioprocess was further determined, generating a high IP production of 2.46 g/L in a 5-L bioreactor with dramatical decrease of oxygen consumption and heat evolution comparing with the wild-type in methanol. This mutant and bioprocess represent a safe and efficient alternative to the traditional glycerol-repressed/methanol-induced PAOX1 system. PMID:28150747

  4. A Strong Start-up Scene Flourishes in the Life Sciences Capital Basel.

    PubMed

    Burckhardt, Peter

    2014-12-01

    Basel is known for its successful global players in Pharma, Agro and Chemicals. The wealth of top-tier companies, universities and academic institutions in such a small region is unparalleled. It creates an optimum climate for world-class research and its translation into successful businesses. This is also reflected in a strong start-up scene. Over the past decades the multinational players have shown that they are able to adapt to the ever-increasing challenges in the market. Basel has seen blue-chip company mergers, accompanied by the transfer of business assets into spin-off companies. This process created a mind-set for change which has positively influenced the local start-up environment. Actelion is one of these former spin-offs that successfully made the transition to become a global player. BioVersys and PIQUR are two of the most promising very early stage Swiss biotech companies. Many other examples can be found in Northwestern Switzerland. The region also offers a solid background of supporting activities. Infrastructure, coaching and all other support are offered and complement national innovation initiatives.

  5. Enhanced anaerobic digestion performance via combined solids- and leachate-based hydrolysis reactor inoculation.

    PubMed

    Wilson, L Paige; Sharvelle, Sybil E; De Long, Susan K

    2016-11-01

    Suboptimal conditions in anaerobic digesters (e.g., presence of common inhibitors ammonia and salinity) limit waste hydrolysis and lead to unstable performance and process failures. Application of inhibitor-tolerant inocula improves hydrolysis, but approaches are needed to establish and maintain these desired waste-hydrolyzing bacteria in high-solids reactors. Herein, performance was compared for leach bed reactors (LBRs) seeded with unacclimated or acclimated inoculum (0-60% by mass) at start-up and over long-term operation. High quantities of inoculum (∼60%) increase waste hydrolysis and are beneficial at start-up or when inhibitors are increasing. After start-up (∼112days) with high inoculum quantities, leachate recirculation leads to accumulation of inhibitor-tolerant hydrolyzing bacteria in leachate. During long-term operation, low inoculum quantities (∼10%) effectively increase waste hydrolysis relative to without solids-derived inoculum. Molecular analyses indicated that combining digested solids with leachate-based inoculum doubles quantities of Bacteria contacting waste over a batch and supplies additional desirable phylotypes Bacteriodes and Clostridia. Copyright © 2016 Elsevier Ltd. All rights reserved.

  6. System for operating solid oxide fuel cell generator on diesel fuel

    NASA Technical Reports Server (NTRS)

    Singh, Prabhu (Inventor); George, Raymond A. (Inventor)

    1997-01-01

    A system is provided for operating a solid oxide fuel cell generator on diesel fuel. The system includes a hydrodesulfurizer which reduces the sulfur content of commercial and military grade diesel fuel to an acceptable level. Hydrogen which has been previously separated from the process stream is mixed with diesel fuel at low pressure. The diesel/hydrogen mixture is then pressurized and introduced into the hydrodesulfurizer. The hydrodesulfurizer comprises a metal oxide such as ZnO which reacts with hydrogen sulfide in the presence of a metal catalyst to form a metal sulfide and water. After desulfurization, the diesel fuel is reformed and delivered to a hydrogen separator which removes most of the hydrogen from the reformed fuel prior to introduction into a solid oxide fuel cell generator. The separated hydrogen is then selectively delivered to the diesel/hydrogen mixer or to a hydrogen storage unit. The hydrogen storage unit preferably comprises a metal hydride which stores hydrogen in solid form at low pressure. Hydrogen may be discharged from the metal hydride to the diesel/hydrogen mixture at low pressure upon demand, particularly during start-up and shut-down of the system.

  7. Surviving and Thriving Your First Year in Private Practice

    PubMed Central

    Schwab, Elizabeth Falk

    2016-01-01

    Taking the leap toward a career as a private practice owner is daunting. When in the initial stages of starting a private practice, I searched for current advice from an audiologist who had recently confronted the same challenges I was about to face. Because of the limited information available, I documented my process in hopes of providing an overview of my startup experience to help others. Included is a timeline of startup tasks and a sample budget to use as a reference. In this chapter, I share my experiences, both the positives and the negatives, and tips with the goal of helping you survive and thrive in your first year in private practice. PMID:28028322

  8. 40 CFR 63.403 - Compliance dates.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... initial startup before September 8, 1994, the compliance date shall be September 8, 1994. (c) For new IPCT's that have an initial startup on or after September 8, 1994, the compliance date shall be the date of the initial startup. ...

  9. 40 CFR 63.403 - Compliance dates.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... initial startup before September 8, 1994, the compliance date shall be September 8, 1994. (c) For new IPCT's that have an initial startup on or after September 8, 1994, the compliance date shall be the date of the initial startup. ...

  10. 40 CFR 63.403 - Compliance dates.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... initial startup before September 8, 1994, the compliance date shall be September 8, 1994. (c) For new IPCT's that have an initial startup on or after September 8, 1994, the compliance date shall be the date of the initial startup. ...

  11. Business Angels - A Subspecies of the homo oeconomicus ludens.

    PubMed

    Hüsler, Laurenz; Platzer, Erich M

    2014-12-01

    Business Angels invest in start-up companies in their early stage. This type of investor usually has a good knowledge of the start-up's industry sector, and in addition to the funds he invests, his management experience and his network can be useful for start-ups. Business Angel involvement has shown to improve the success rate and the profitability of start-ups. The article depicts the relationship between entrepreneurs and Business Angels in four case examples.

  12. Improving startup graphs of nonunitized turbines

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trukhnii, A.D.; Shreder, K.; Kochetov, A.A.

    1981-12-01

    The existing startup instructions for nonunitized steam turbines in a number of cases are not optimum from the standpoint of low-cycle fatigue. Lengthening the period of acceleration, holding at idle and loading not only lead to significant startup losses of fuel, but also reduce the low-cycle strength of the rotor. Eliminating these drawbacks within the scope of ordinary technology for startup and in the absence of other factors not associated with low-cycle fatigue will enable us to reduce by more than a factor of two the length of startups from the cold and noncold states and in so doing increasemore » low-cycle lifetime by a factor of 1.5-2. The use of steam with low parameters from a collector is effective at low initial rotor temperatures, in particular, during startups from the cold state. For this case it is possible to increase low-cycle lifetime by almost a factor of 3 by limiting the total startup time by one hour. The use of steam with varying temperatures essentially solved the problem of low-cycle lifetime of a rotor during startups from all heat states, especially from the noncold and hot states. Increasing the radius of curvature of the heat channel during modernization or major overhaul of a turbine will enable us to increase its low-cycle lifetime by a factor of 2-4.« less

  13. 40 CFR 63.9610 - What are my general requirements for complying with this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... section at all times, except during periods of startup, shutdown, and malfunction. The terms startup... develop a written startup, shutdown, and malfunction plan according to the provisions in § 63.6(e)(3). [68...

  14. Sonic limitations and startup problems of heat pipes

    NASA Technical Reports Server (NTRS)

    Deverall, J. E.; Kemme, J. E.; Florschuetz, L. W.

    1972-01-01

    Introduction of small amounts of inert, noncombustible gas aids startup in certain types of heat pipes. When the heat pipe is closely coupled to the heat sink, the startup system must be designed to bring the heat sink on-line slowly.

  15. 77 FR 11142 - Agency Information Collection Activities: Proposed Collection; Comment Request, State/Local...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ..., and to establish a coordinated process to implement the plan, taking advantage of a wide-range of... maintenance costs for technical services. There are no annual start-up or capital costs. The estimated annual...

  16. 76 FR 13200 - Agency Information Collection Activities: Proposed Collection; Comment Request, 1660-0062; State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-10

    ... losses from hazards, and to establish a coordinated process to implement the plan, taking advantage of a... maintenance, or capital and start-up costs associated with this collection of information. Comments Comments...

  17. 12 CFR 1271.1 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    .... Assets includes furniture and equipment, leasehold improvements, and capitalized start-up costs. Data communication means transmitting and receiving of data to or from Banks, Federal Reserve offices, clearinghouse... for delivery of information; and telephone inquiry service. Data processing includes capture, storage...

  18. Martins Creek S. E. S. 800-MW Units 3 and 4: design and operating experience with axial-flow FD and ID fans

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Curley, C.C.; Overas, A.J.

    1976-01-01

    The design and performance of the variable-pitch axial-flow forced-draft and induced-draft fans used in two 820MW generating units at the Martins Creek Power Plant are described. Information is included on fan design; silencers; mechanical and metallurgical testing; insulation; performance testing; start-up and shutdown procedures; and maintenance. (LCL)

  19. Next-Generation Entrepreneurs Ready to Advance Breast Cancer Research Innovations | Poster

    Cancer.gov

    By Michele Newton and Thomas Stackhouse, Contributing Writers, and Rosemarie Truman, Guest Writer Editor’s note: In May 2014, the Breast Cancer Start-Up Challenge was named one of six finalists in the HHS Innovates Award Competition. This award celebrates innovations developed by employees of the U.S. Department of Health and Human Services (HHS) to support the mission of HHS.

  20. Experience with the design and start up of two full-scale UASB plants in Brazil: enhancements and drawbacks.

    PubMed

    Chernicharo, C A L; Almeida, P G S; Lobato, L C S; Couto, T C; Borges, J M; Lacerda, Y S

    2009-01-01

    This paper discusses the main drawbacks and enhancements experienced with the design and start up of two full-scale UASB plants in Brazil. The topics addressed are related to blockage of inlet pipes, scum accumulation, seed sludge for the start-up, corrosion and gas leakage, odour generation and sludge management. The paper describes the main improvements achieved.

  1. Innovative Practices for Special Warfare

    DTIC Science & Technology

    2015-12-01

    stealing customers from traditional quick service fast food restaurants .243 Innovations in restaurant design, food preparation and distribution, are...and diverse organizations to reap the benefits of loyalty and connectivity that small teams enjoy.152 To create the linkages, JSOC strove to dissolve...those new to a field. Garage startups generate many disruptive innovations because “they are not tied to any specific customer base, product design

  2. Successful startup of a full-scale acrylonitrile wastewater biological treatment plant (ACN-WWTP) by eliminating the inhibitory effects of toxic compounds on nitrification.

    PubMed

    Han, Yuanyuan; Jin, Xibiao; Wang, Feng; Liu, Yongdi; Chen, Xiurong

    2014-01-01

    During the startup of a full-scale anoxic/aerobic (A/O) biological treatment plant for acrylonitrile wastewater, the removal efficiencies of NH(3)-N and total Kjeldahl nitrogen (TKN) were 1.29 and 0.83% on day 30, respectively. The nitrification process was almost totally inhibited, which was mainly caused by the inhibitory effects of toxic compounds. To eliminate the inhibition, cultivating the bacteria that degrade toxic compounds with patience was applied into the second startup of the biological treatment plant. After 75 days of startup, the inhibitory effects of the toxic compounds on nitrification were eliminated. The treatment plant has been operated stably for more than 3 years. During the last 100 days, the influent concentrations of chemical oxygen demand (COD), NH(3)-N, TKN and total cyanide (TCN) were 831-2,164, 188-516, 306-542 and 1.17-9.57 mg L(-1) respectively, and the effluent concentrations were 257 ± 30.9, 3.30 ± 1.10, 31.6 ± 4.49 and 0.40 ± 0.10 mg L(-1) (n = 100), respectively. Four strains of cyanide-degrading bacteria which were able to grow with cyanide as the sole carbon and nitrogen source were isolated from the full-scale biological treatment plant. They were short and rod-shaped under scanning electron microscopy (SEM) and were identified as Brevundimonas sp., Rhizobium sp., Dietzia natronolimnaea and Microbacterium sp., respectively.

  3. A Guide for Developing Standard Operating Job Procedures for the Pump Station Process Wastewater Treatment Facility. SOJP No. 3.

    ERIC Educational Resources Information Center

    Perley, Gordon F.

    This is a guide for standard operating job procedures for the pump station process of wastewater treatment plants. Step-by-step instructions are given for pre-start up inspection, start-up procedures, continuous routine operation procedures, and shut-down procedures. A general description of the equipment used in the process is given. Two…

  4. 76 FR 30925 - Information Collection; Submission for OMB Review, Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-27

    .../startup): None. Total Burden Cost (operating/maintenance): None. Instrument: Application and Budget.../startup): None. Total Burden Cost (operating/maintenance): None. AmeriCorps\\*\\VISTA Project Progress...,800 hours. Total Burden Cost (capital/startup): None. Total Burden Cost (operating/maintenance): None...

  5. 40 CFR 63.9565 - What definitions apply to this subpart?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... limitation (including any operating limit) in this subpart during startup, shutdown, or malfunction.... Examples include hexane, toluene, and trichloroethylene. Initial startup means the first time that equipment is put into operation. Initial startup does not include operation solely for testing equipment...

  6. 40 CFR 63.9565 - What definitions apply to this subpart?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... limitation (including any operating limit) in this subpart during startup, shutdown, or malfunction.... Examples include hexane, toluene, and trichloroethylene. Initial startup means the first time that equipment is put into operation. Initial startup does not include operation solely for testing equipment...

  7. 40 CFR 63.9565 - What definitions apply to this subpart?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... limitation (including any operating limit) in this subpart during startup, shutdown, or malfunction.... Examples include hexane, toluene, and trichloroethylene. Initial startup means the first time that equipment is put into operation. Initial startup does not include operation solely for testing equipment...

  8. 40 CFR 63.9565 - What definitions apply to this subpart?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... limitation (including any operating limit) in this subpart during startup, shutdown, or malfunction.... Examples include hexane, toluene, and trichloroethylene. Initial startup means the first time that equipment is put into operation. Initial startup does not include operation solely for testing equipment...

  9. 40 CFR 63.1354 - Reporting requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... operator during a startup, shutdown, or malfunction of an affected source (including actions taken to correct a malfunction) are consistent with the procedures specified in the source's startup, shutdown, and... report. Reports shall only be required if a startup, shutdown, or malfunction occurred during the...

  10. Non-solenoidal Startup via Local Helicity Injection on Pegasus: Progress and Plans

    NASA Astrophysics Data System (ADS)

    Reusch, J. A.; Barr, J. L.; Bodner, G. M.; Bongard, M. W.; Burke, M. G.; Fonck, R. J.; Hinson, E. T.; Lewicki, B. T.; Perry, J. M.; Schlossberg, D. J.

    2015-11-01

    Non-solenoidal plasma startup via local helicity injection (LHI) at the Pegasus toroidal experiment now provides routine operation at Ip ~ 0.17MA with Iinj ~ 5kA and Vinj ~ 1kV from four active arc injectors. Experiments in the past year have advanced the understanding of the governing physics of LHI and its supporting technology. Injector impedance scales as Vinj3/ 2 and is governed by two effects: a quasineutrality constraint on electron beam propagation, related to the tokamak edge density, and double-layer sheath expansion, related to narc. Injector design improvements permit operation at Vinj >= 1 kV without deleterious PMI or impurity generation. Discharges with varied shape, Ip(t), and helicity input test a predictive 0D power-balance model for LHI startup. Anomalous, reconnection-driven Ti >800 eV and strong MHD activity localized near the injectors are observed during LHI. Preliminary core Thomson scattering measurements indicate surprisingly high Te >300 eV, which if verified may indicate the dominance of high-energy electron fueling from the injector current streams. A new divertor injector system has been designed to substantially increase the available helicity input rate and support critical studies of confinement during LHI and reconnection activity at high Ip. A proposed upgrade to the Pegasus experiment will extend these studies to NSTX-U relevant parameters. Support: US DOE grants DE-FG02-96ER54375; and DE-SC0006928.

  11. Quick-start of full-scale anaerobic digestion (AD) using aeration

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lagerkvist, Anders, E-mail: al@ltu.se; Pelkonen, Markku; Wikström, Tommy

    Highlights: • A fast, and original, start up procedure for anaerobic digestors has been applied at full scale. • The development of a methanogenic culture has been documented using fluorescent in situ hybridization. • The technique can be widely applied. - Abstract: A conventional 1300 m{sup 3} continuously stirred anaerobic tank reactor at the city of Boden, north Sweden, which was receiving a feed of both sewage sludge and food waste, was put out of operation due to the build-up of a float phase. The reactor was emptied and cleaned. At start-up there was no methanogenic sludge available, so anmore » unconventional start-up procedure was applied: The reactor was rapidly (8 days with 1200 kg of total solids (TS) added daily) filled with thickened, and slightly acidic sewage sludge, showing only slight methane generation, which was subsequently heated to 55 °C. Then compressed air was blown into the digester and within a month a fully functional methanogenic culture was established. The transfer from acidogenic to methanogenic conditions happened in about one week. As a start-up technique this is fast and cost efficient, it only requires the access of a compressor, electricity and a source of air. In total, about 16 tonnes of oxygen were used. It is proposed that this method may also be used as an operational amendment technique, should a reactor tend to acidify.« less

  12. University Start-ups: A Better Business Model

    NASA Astrophysics Data System (ADS)

    Dehn, J.; Webley, P. W.

    2015-12-01

    Many universities look to start-up companies as a way to attract faculty, supporting research and students as traditional federal sources become harder to come by. University affiliated start-up companies can apply for a broader suite of grants, as well as market their services to a broad customer base. Often university administrators see this as a potential panacea, but national statistics show this is not the case. Rarely do universities profit significantly from their start-ups. With a success rates of around 20%, most start-ups end up costing the university money as well as faculty-time. For the faculty, assuming they want to continue in academia, a start-up is often unattractive because it commonly leads out of academia. Running a successful business as well as maintaining a strong teaching and research load is almost impossible to do at the same time. Most business models and business professionals work outside of academia, and the models taught in business schools do not merge well in a university environment. To mitigate this a new business model is proposed where university start-ups are aligned with the academic and research missions of the university. A university start-up must work within the university, directly support research and students, and the work done maintaining the business be recognized as part of the faculty member's university obligations. This requires a complex conflict of interest management plan and for the companies to be non-profit in order to not jeopardize the university's status. This approach may not work well for all universities, but would be ideal for many to conserve resources and ensure a harmonious relationship with their start-ups and faculty.

  13. Mitigation of steam generator tube rupture in a pressurized water reactor with passive safety systems

    DOEpatents

    McDermott, D.J.; Schrader, K.J.; Schulz, T.L.

    1994-05-03

    The effects of steam generator tube ruptures in a pressurized water reactor are mitigated by reducing the pressure in the primary loop by diverting reactor coolant through the heat exchanger of a passive heat removal system immersed in the in containment refueling water storage tank in response to a high feed water level in the steam generator. Reactor coolant inventory is maintained by also in response to high steam generator level introducing coolant into the primary loop from core make-up tanks at the pressure in the reactor coolant system pressurizer. The high steam generator level is also used to isolate the start-up feed water system and the chemical and volume control system to prevent flooding into the steam header. 2 figures.

  14. Mitigation of steam generator tube rupture in a pressurized water reactor with passive safety systems

    DOEpatents

    McDermott, Daniel J.; Schrader, Kenneth J.; Schulz, Terry L.

    1994-01-01

    The effects of steam generator tube ruptures in a pressurized water reactor are mitigated by reducing the pressure in the primary loop by diverting reactor coolant through the heat exchanger of a passive heat removal system immersed in the in containment refueling water storage tank in response to a high feed water level in the steam generator. Reactor coolant inventory is maintained by also in response to high steam generator level introducing coolant into the primary loop from core make-up tanks at the pressure in the reactor coolant system pressurizer. The high steam generator level is also used to isolate the start-up feed water system and the chemical and volume control system to prevent flooding into the steam header. 2 figures.

  15. 20 CFR 632.254 - Program startup.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program startup. 632.254 Section 632.254 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR INDIAN AND NATIVE AMERICAN EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.254 Program startup...

  16. 20 CFR 632.254 - Program startup.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Program startup. 632.254 Section 632.254 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR INDIAN AND NATIVE AMERICAN EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.254 Program startup...

  17. 20 CFR 632.254 - Program startup.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 3 2012-04-01 2012-04-01 false Program startup. 632.254 Section 632.254 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR INDIAN AND NATIVE AMERICAN EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.254 Program startup...

  18. 40 CFR 63.1354 - Reporting requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... owner or operator during a startup, shutdown, or malfunction of an affected source (including actions taken to correct a malfunction) are consistent with the procedures specified in the source's startup... information in a semiannual report. Reports shall only be required if a startup, shutdown, or malfunction...

  19. 40 CFR 52.1183 - Visibility protection.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... excess emissions that occurs during startups, shutdowns, and malfunctions of the unit, the nature and... that occurs during startups, shutdowns, and malfunctions of the unit, the nature and cause of any... startup, shutdown, and malfunction. (viii) All CEMS required by this section must meet the minimum data...

  20. Start-Up of an Anaerobic Dynamic Membrane Digester for Waste Activated Sludge Digestion: Temporal Variations in Microbial Communities

    PubMed Central

    Yu, Hongguang; Wang, Qiaoying; Wang, Zhiwei; Sahinkaya, Erkan; Li, Yongli; Ma, Jinxing; Wu, Zhichao

    2014-01-01

    An anaerobic dynamic membrane digester (ADMD) was developed to digest waste sludge, and pyrosequencing was used to analyze the variations of the bacterial and archaeal communities during the start-up. Results showed that bacterial community richness decreased and then increased over time, while bacterial diversity remained almost the same during the start-up. Proteobacteria and Bacteroidetes were the major phyla. At the class level, Betaproteobacteria was the most abundant at the end of start-up, followed by Sphingobacteria. In the archaeal community, richness and diversity peaked at the end of the start-up stage. Principle component and cluster analyses demonstrated that archaeal consortia experienced a distinct shift and became stable after day 38. Methanomicrobiales and Methanosarcinales were the two predominant orders. Further investigations indicated that Methanolinea and Methanosaeta were responsible for methane production in the ADMD system. Hydrogenotrophic pathways might prevail over acetoclastic means for methanogenesis during the start-up, supported by specific methanogenic activity tests. PMID:24695488

  1. Optimization of Passive Voltage Multipliers for Fast Start-up and Multi-voltage Power Supplies in Electromagnetic Energy Harvesting Systems

    NASA Astrophysics Data System (ADS)

    Yang, G.; Stark, B. H.; Burrow, S. G.; Hollis, S. J.

    2014-11-01

    This paper demonstrates the use of passive voltage multipliers for rapid start-up of sub-milliwatt electromagnetic energy harvesting systems. The work describes circuit optimization to make as short as possible the transition from completely depleted energy storage to the first powering-up of an actively controlled switched-mode converter. The dependency of the start-up time on component parameters and topologies is derived by simulation and experimentation. The resulting optimized multiplier design reduces the start-up time from several minutes to 1 second. An additional improvement uses the inherent cascade structure of the voltage multiplier to power sub-systems at different voltages. This multi-rail start-up is shown to reduce the circuit losses of the active converter by 72% with respect to the optimized single-rail system. The experimental results provide insight into the multiplier's transient behaviour, including circuit interactions, in a complete harvesting system, and offer important information to optimize voltage multipliers for rapid start-up.

  2. 40 CFR 63.5320 - How does my affected major source comply with the HAP emission standards?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... all times, including periods of startup, shutdown, and malfunction. (b) You must always operate and... record monthly the pounds of each type of finish applied for each leather product process operation and...

  3. 40 CFR 63.5320 - How does my affected major source comply with the HAP emission standards?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... all times, including periods of startup, shutdown, and malfunction. (b) You must always operate and... record monthly the pounds of each type of finish applied for each leather product process operation and...

  4. Technology advancement of the static feed water electrolysis process

    NASA Technical Reports Server (NTRS)

    Jensen, F. C.; Schubert, F. H.

    1977-01-01

    Some results are presented of a research and development program to continue the development of a method to generate oxygen for crew metabolic consumption during extended manned space flights. The concept being pursued is that of static feed water electrolysis. Specific major results of the work included: (1) completion of a 30-day electrode test using a Life Systems, Inc.-developed high performance catalyst. During startup the cell voltages were as low as 1.38 V at current densities of 108 mA/sq cm (100 ASF) and temperatures of 355 K (180 F). At the end of 30 days of testing the cell voltages were still only 1.42 V at 108 mA/sq cm, (2) determination that the Static Feed Water Electrolysis Module does not release an aerosol of the cell electrolyte into the product gas streams after a break-in period of 24 hours following a new electrolyte charge, and (3) completion of a detailed design analysis of an electrochemical Oxygen Generation Subsystem at a three-man level (4.19 kg/day (9.24 lb/day) of oxygen).

  5. Control Strategies for Drug Product Continuous Direct Compression-State of Control, Product Collection Strategies, and Startup/Shutdown Operations for the Production of Clinical Trial Materials and Commercial Products.

    PubMed

    Almaya, Ahmad; De Belder, Lawrence; Meyer, Robert; Nagapudi, Karthik; Lin, Hung-Ren Homer; Leavesley, Ian; Jayanth, Jayanthy; Bajwa, Gurjit; DiNunzio, James; Tantuccio, Anthony; Blackwood, Dan; Abebe, Admassu

    2017-04-01

    Continuous manufacturing (CM) has emerged in the pharmaceutical industry as a paradigm shift with significant advantages related to cost, efficiency, flexibility, and higher assurance of quality. The inherent differences from batch processes justify examining the CM control strategy more holistically. This article describes the current thinking for the control and implementation of CM, using the example of a direct compression process and taking into consideration the ICH Q10 definition of "state of control" and process validation requirements. Statistical process control using control charts, sources of variation, process capability, and process performance is explained as a useful concept that can help assess the impact of variation within a batch and indicates if a process is in state of control. The potential for time-variant nature of startup and shutdown with CM is discussed to assure product quality while minimizing waste as well as different options for detection and isolation of non-conforming materials due to process upsets. While different levels of control are possible with CM, an appropriate balance between process control and end product testing is needed depending on the level of process understanding at the different stages of development from the production of clinical supplies through commercialization. Copyright © 2017 American Pharmacists Association®. Published by Elsevier Inc. All rights reserved.

  6. 40 CFR 63.2862 - What records must I keep?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) initial startup period or the § 63.2850(e)(2) malfunction period. Complete both plans before the... such as normal operation, nonoperating, initial startup period, malfunction period, or exempt operation... inventory. (ii) The operating status of your source such as normal operation, nonoperating, initial startup...

  7. 40 CFR 63.2862 - What records must I keep?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) initial startup period or the § 63.2850(e)(2) malfunction period. Complete both plans before the... such as normal operation, nonoperating, initial startup period, malfunction period, or exempt operation... inventory. (ii) The operating status of your source such as normal operation, nonoperating, initial startup...

  8. 40 CFR 63.2862 - What records must I keep?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) initial startup period or the § 63.2850(e)(2) malfunction period. Complete both plans before the... such as normal operation, nonoperating, initial startup period, malfunction period, or exempt operation... inventory. (ii) The operating status of your source such as normal operation, nonoperating, initial startup...

  9. 40 CFR 63.1164 - Reporting requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... written extension of compliance. (c) Periodic startup, shutdown, and malfunction reports. Section 63.6(e... by the standard at all times, including during any period of startup, shutdown, or malfunction...)(3) of subpart A of this part, the owner or operator shall develop a written startup, shutdown, and...

  10. 40 CFR 63.1164 - Reporting requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... written extension of compliance. (c) Periodic startup, shutdown, and malfunction reports. Section 63.6(e... by the standard at all times, including during any period of startup, shutdown, or malfunction...)(3) of subpart A of this part, the owner or operator shall develop a written startup, shutdown, and...

  11. 40 CFR 63.1164 - Reporting requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... written extension of compliance. (c) Periodic startup, shutdown, and malfunction reports. Section 63.6(e... by the standard at all times, including during any period of startup, shutdown, or malfunction...)(3) of subpart A of this part, the owner or operator shall develop a written startup, shutdown, and...

  12. 40 CFR 63.2862 - What records must I keep?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) initial startup period or the § 63.2850(e)(2) malfunction period. Complete both plans before the... such as normal operation, nonoperating, initial startup period, malfunction period, or exempt operation... inventory. (ii) The operating status of your source such as normal operation, nonoperating, initial startup...

  13. 40 CFR 63.2862 - What records must I keep?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) initial startup period or the § 63.2850(e)(2) malfunction period. Complete both plans before the... such as normal operation, nonoperating, initial startup period, malfunction period, or exempt operation... inventory. (ii) The operating status of your source such as normal operation, nonoperating, initial startup...

  14. 40 CFR 270.235 - Options for incinerators, cement kilns, lightweight aggregate kilns, solid fuel boilers, liquid...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... to minimize emissions from startup, shutdown, and malfunction events. 270.235 Section 270.235... from startup, shutdown, and malfunction events. (a) Facilities with existing permits—(1) Revisions to... from startup, shutdown, and malfunction events under any of the following options when requesting...

  15. 40 CFR 270.235 - Options for incinerators, cement kilns, lightweight aggregate kilns, solid fuel boilers, liquid...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... to minimize emissions from startup, shutdown, and malfunction events. 270.235 Section 270.235... from startup, shutdown, and malfunction events. (a) Facilities with existing permits—(1) Revisions to... from startup, shutdown, and malfunction events under any of the following options when requesting...

  16. 40 CFR 270.235 - Options for incinerators, cement kilns, lightweight aggregate kilns, solid fuel boilers, liquid...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... to minimize emissions from startup, shutdown, and malfunction events. 270.235 Section 270.235... from startup, shutdown, and malfunction events. (a) Facilities with existing permits—(1) Revisions to... from startup, shutdown, and malfunction events under any of the following options when requesting...

  17. 40 CFR 270.235 - Options for incinerators, cement kilns, lightweight aggregate kilns, solid fuel boilers, liquid...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... to minimize emissions from startup, shutdown, and malfunction events. 270.235 Section 270.235... from startup, shutdown, and malfunction events. (a) Facilities with existing permits—(1) Revisions to... from startup, shutdown, and malfunction events under any of the following options when requesting...

  18. 40 CFR 52.271 - Malfunction, startup, and shutdown regulations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Malfunction, startup, and shutdown regulations. 52.271 Section 52.271 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.271 Malfunction, startup, and shutdown regulations. (a)...

  19. 40 CFR 52.271 - Malfunction, startup, and shutdown regulations.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Malfunction, startup, and shutdown regulations. 52.271 Section 52.271 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.271 Malfunction, startup, and shutdown regulations. (a)...

  20. 40 CFR 52.271 - Malfunction, startup, and shutdown regulations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Malfunction, startup, and shutdown regulations. 52.271 Section 52.271 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.271 Malfunction, startup, and shutdown regulations. (a)...

  1. 40 CFR 52.271 - Malfunction, startup, and shutdown regulations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Malfunction, startup, and shutdown regulations. 52.271 Section 52.271 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.271 Malfunction, startup, and shutdown regulations. (a)...

  2. 40 CFR 52.271 - Malfunction, startup, and shutdown regulations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Malfunction, startup, and shutdown regulations. 52.271 Section 52.271 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.271 Malfunction, startup, and shutdown regulations. (a)...

  3. 40 CFR 63.11506 - What are my compliance dates?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... startup date is on or before July 1, 2008, you must achieve compliance with the provisions of this subpart... startup date is after July 1, 2008, you must achieve compliance with the provisions of this subpart upon initial startup of your affected source. Standards and Compliance Requirements ...

  4. 40 CFR 63.11422 - What are my compliance dates?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... later than July 16, 2008. (b) If you startup a new affected source on or before July 16, 2007, you must... startup a new affected source after July 16, 2007, you must achieve compliance with the provisions in this subpart upon startup of your affected source. Standards and Compliance Requirements ...

  5. 40 CFR 63.2860 - What notifications must I submit and when?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .... (2) The notification of actual startup date must also include whether you have elected to operate under an initial startup period subject to § 63.2850(c)(2) and provide an estimate and justification for the anticipated duration of the initial startup period. (c) Significant modification notifications...

  6. 40 CFR 63.11506 - What are my compliance dates?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... startup date is on or before July 1, 2008, you must achieve compliance with the provisions of this subpart... startup date is after July 1, 2008, you must achieve compliance with the provisions of this subpart upon initial startup of your affected source. Standards and Compliance Requirements ...

  7. 40 CFR Table 15 to Subpart Xxxx of... - Requirements for Reports

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... had a startup, shutdown or malfunction during the reporting period and you took actions consistent with your startup, shutdown, and malfunction plan, the compliance report must include the information... requirements for annual reporting in § 63.6010(f). 2. Immediate startup, shutdown, and malfunction report if...

  8. 40 CFR 63.1351 - Compliance dates.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... that commenced construction before or on March 24, 1998, or (2) June 14, 1999 or startup for sources..., or (2) Startup for sources that commenced construction after December 20, 2006. (c) The compliance... September 9, 2013. (d) The compliance date for new sources is November 9, 2010 or startup, whichever is...

  9. 40 CFR 63.1351 - Compliance dates.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... that commenced construction before or on March 24, 1998, or (2) June 14, 1999 or startup for sources..., or (2) Startup for sources that commenced construction after December 20, 2006. (c) The compliance... September 9, 2013. (d) The compliance date for new sources is November 9, 2010 or startup, whichever is...

  10. 40 CFR 63.11506 - What are my compliance dates?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... startup date is on or before July 1, 2008, you must achieve compliance with the provisions of this subpart... startup date is after July 1, 2008, you must achieve compliance with the provisions of this subpart upon initial startup of your affected source. Standards and Compliance Requirements ...

  11. 78 FR 20855 - State Implementation Plans: Response to Petition for Rulemaking; Findings of Substantial...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-08

    ... SIP Calls To Amend Provisions Applying to Excess Emissions During Periods of Startup, Shutdown, and... SIP Calls to Amend Provisions Applying to Excess Emissions During Periods of Startup, Shutdown, and... Amend Provisions Applying to Excess Emissions During Periods of Startup, Shutdown, and Malfunction...

  12. 40 CFR 63.11422 - What are my compliance dates?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... later than July 16, 2008. (b) If you startup a new affected source on or before July 16, 2007, you must... startup a new affected source after July 16, 2007, you must achieve compliance with the provisions in this subpart upon startup of your affected source. Standards and Compliance Requirements ...

  13. 40 CFR 63.11506 - What are my compliance dates?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... startup date is on or before July 1, 2008, you must achieve compliance with the provisions of this subpart... startup date is after July 1, 2008, you must achieve compliance with the provisions of this subpart upon initial startup of your affected source. Standards and Compliance Requirements ...

  14. 40 CFR 63.2860 - What notifications must I submit and when?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... (2) The notification of actual startup date must also include whether you have elected to operate under an initial startup period subject to § 63.2850(c)(2) and provide an estimate and justification for the anticipated duration of the initial startup period. (c) Significant modification notifications...

  15. 40 CFR 63.1351 - Compliance dates.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... or startup for sources that commenced construction after March 24, 1998. (b) The compliance date for... before or on December 20, 2006, or (2) Startup for sources that commenced construction after December 20... compliance date for new sources is February 12, 2013, or startup, whichever is later. (e) The compliance date...

  16. 40 CFR 63.1351 - Compliance dates.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... or startup for sources that commenced construction after March 24, 1998. (b) The compliance date for... before or on December 20, 2006, or (2) Startup for sources that commenced construction after December 20... compliance date for new sources is February 12, 2013, or startup, whichever is later. (e) The compliance date...

  17. 40 CFR 63.11641 - What are my compliance dates?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... startup of your affected source is on or before February 17, 2011, you must comply with the provisions of... initial startup of your affected source is after February 17, 2011, you must comply with the provisions of this subpart upon startup of your affected source. Standards and Compliance Requirements ...

  18. 40 CFR 63.11422 - What are my compliance dates?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... later than July 16, 2008. (b) If you startup a new affected source on or before July 16, 2007, you must... startup a new affected source after July 16, 2007, you must achieve compliance with the provisions in this subpart upon startup of your affected source. Standards and Compliance Requirements ...

  19. 40 CFR 63.11641 - What are my compliance dates?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... startup of your affected source is on or before February 17, 2011, you must comply with the provisions of... initial startup of your affected source is after February 17, 2011, you must comply with the provisions of this subpart upon startup of your affected source. Standards and Compliance Requirements ...

  20. 40 CFR 63.11641 - What are my compliance dates?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... startup of your affected source is on or before February 17, 2011, you must comply with the provisions of... initial startup of your affected source is after February 17, 2011, you must comply with the provisions of this subpart upon startup of your affected source. Standards and Compliance Requirements ...

  1. 40 CFR 63.2860 - What notifications must I submit and when?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .... (2) The notification of actual startup date must also include whether you have elected to operate under an initial startup period subject to § 63.2850(c)(2) and provide an estimate and justification for the anticipated duration of the initial startup period. (c) Significant modification notifications...

  2. 40 CFR 63.11422 - What are my compliance dates?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... later than July 16, 2008. (b) If you startup a new affected source on or before July 16, 2007, you must... startup a new affected source after July 16, 2007, you must achieve compliance with the provisions in this subpart upon startup of your affected source. Standards and Compliance Requirements ...

  3. 40 CFR 63.11422 - What are my compliance dates?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... later than July 16, 2008. (b) If you startup a new affected source on or before July 16, 2007, you must... startup a new affected source after July 16, 2007, you must achieve compliance with the provisions in this subpart upon startup of your affected source. Standards and Compliance Requirements ...

  4. 40 CFR 63.11641 - What are my compliance dates?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... startup of your affected source is on or before February 17, 2011, you must comply with the provisions of... initial startup of your affected source is after February 17, 2011, you must comply with the provisions of this subpart upon startup of your affected source. Standards and Compliance Requirements ...

  5. 40 CFR 63.11506 - What are my compliance dates?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... startup date is on or before July 1, 2008, you must achieve compliance with the provisions of this subpart... startup date is after July 1, 2008, you must achieve compliance with the provisions of this subpart upon initial startup of your affected source. Standards and Compliance Requirements ...

  6. 40 CFR 65.48 - Reporting provisions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) CONSOLIDATED FEDERAL AIR RULE Storage Vessels § 65.48 Reporting provisions. (a) Notification of initial startup. If § 65.5(b) requires that a notification of initial startup be filed, then the content of the notification of initial startup shall at least include the information specified in § 65.5(b) and the...

  7. 40 CFR 63.366 - Reporting requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of (initial) startup of the source. (8) The type and quantity of hazardous air pollutants emitted by.... New or reconstructed sources subject to these emissions standards with an initial startup date before... application shall be submitted as soon as practicable before the initial startup date but no later than 60...

  8. 40 CFR 63.8635 - What reports must I submit and when?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of report and beginning and ending dates of the reporting period. (4) If you had a startup, shutdown... section. This includes periods of startup, shutdown, malfunction, and routine control device maintenance... (e)(1) through (13) of this section. This includes periods of startup, shutdown, malfunction, and...

  9. 40 CFR 65.48 - Reporting provisions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) CONSOLIDATED FEDERAL AIR RULE Storage Vessels § 65.48 Reporting provisions. (a) Notification of initial startup. If § 65.5(b) requires that a notification of initial startup be filed, then the content of the notification of initial startup shall at least include the information specified in § 65.5(b) and the...

  10. 26 CFR 1.860A-0 - Outline of REMIC provisions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... REMIC return. (1) In general. (2) REMIC whose startup day is before November 10, 1988. (i) In general. (ii) Startup day. (iii) Exception. (d) Designation of tax matters person. (e) Notice to holders of.... (4) Fixed terms on the startup day. (5) Contingencies prohibited. (b) Special rules for regular...

  11. 40 CFR 63.10 - Recordkeeping and reporting requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... relevant records for such source of— (i) The occurrence and duration of each startup or shutdown when the startup or shutdown causes the source to exceed any applicable emission limitation in the relevant... startup or shutdown when the source exceeded applicable emission limitations in a relevant standard and...

  12. 40 CFR 63.1367 - Recordkeeping requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) of subpart A of this part. (3) Startup, shutdown, and malfunction plan. The owner or operator of an affected source shall develop a written startup, shutdown, and malfunction plan as specified in § 63.6(e)(3... during periods of startup, shutdown, and malfunction and a program for corrective action for a...

  13. 40 CFR 63.10 - Recordkeeping and reporting requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... relevant records for such source of— (i) The occurrence and duration of each startup or shutdown when the startup or shutdown causes the source to exceed any applicable emission limitation in the relevant... startup or shutdown when the source exceeded applicable emission limitations in a relevant standard and...

  14. 26 CFR 1.860A-0 - Outline of REMIC provisions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... REMIC return. (1) In general. (2) REMIC whose startup day is before November 10, 1988. (i) In general. (ii) Startup day. (iii) Exception. (d) Designation of tax matters person. (e) Notice to holders of.... (4) Fixed terms on the startup day. (5) Contingencies prohibited. (b) Special rules for regular...

  15. 40 CFR 63.8635 - What reports must I submit and when?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of report and beginning and ending dates of the reporting period. (4) If you had a startup, shutdown... section. This includes periods of startup, shutdown, malfunction, and routine control device maintenance... (e)(1) through (13) of this section. This includes periods of startup, shutdown, malfunction, and...

  16. 40 CFR 63.1346 - Operating limits for kilns.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., is not exceeded, except during periods of startup and shutdown when the temperature limit may be... not exceeded, except during periods of startup/shutdown when the temperature limit may be exceeded by... periods of startup/shutdown when the temperature limit may be exceeded by no more than 10 percent. (b) The...

  17. 40 CFR 63.10 - Recordkeeping and reporting requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... relevant records for such source of— (i) The occurrence and duration of each startup or shutdown when the startup or shutdown causes the source to exceed any applicable emission limitation in the relevant... startup or shutdown when the source exceeded applicable emission limitations in a relevant standard and...

  18. 40 CFR 63.10 - Recordkeeping and reporting requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... relevant records for such source of— (i) The occurrence and duration of each startup or shutdown when the startup or shutdown causes the source to exceed any applicable emission limitation in the relevant... startup or shutdown when the source exceeded applicable emission limitations in a relevant standard and...

  19. 40 CFR 63.8635 - What reports must I submit and when?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of report and beginning and ending dates of the reporting period. (4) If you had a startup, shutdown... section. This includes periods of startup, shutdown, malfunction, and routine control device maintenance... (e)(1) through (13) of this section. This includes periods of startup, shutdown, malfunction, and...

  20. 40 CFR 63.1346 - Operating limits for kilns.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... not exceeded, except during periods of startup/shutdown when the temperature limit may be exceeded by..., except during periods of startup/shutdown when the temperature limit may be exceeded by no more than 10... performance test, with or without the raw mill operating, is not exceeded, except during periods of startup...

Top