Sample records for graduate management project

  1. Graduate Student Project: Employer Operations Management Analysis

    ERIC Educational Resources Information Center

    Fish, Lynn A.

    2008-01-01

    Part-time graduate students at an Association to Advance Collegiate Schools of Business-accredited college complete a unique project by applying operations management concepts to their current employer. More than 92% of 368 graduates indicated that this experiential project was a positive learning experience, and results show a positive impact on…

  2. Graduate Student Project: Operations Management Product Plan

    ERIC Educational Resources Information Center

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  3. Global Project Management: Graduate Course

    DTIC Science & Technology

    2006-01-01

    business and if the project will have successful performance. In the final project presentation, the student should address what countries they may...the idiosyncrasies of different countries in an effort to plan a successful global project execution. Alternate schedule. This class may be used for...required? * Will religious factors influence the project? 24-Mar-06 ENCE ft 24 13 GP Characteristics * Multiple Time Zones * Exchange rates * Long

  4. Creating a Project-Based Learning Environment to Improve Project Management Skills of Graduate Students

    ERIC Educational Resources Information Center

    Arantes do Amaral, Joao Alberto; Gonçalves, Paulo; Hess, Aurélio

    2015-01-01

    This article describes the project-based learning environment created to support project management graduate courses. The paper will focus on the learning context and procedures followed for 13 years, in 47 project-based learning MBA courses, involving approximately 1,400 students and 34 community partners.

  5. Cast Study: National Naval Medical Center, A Graduate Management Project

    DTIC Science & Technology

    2002-06-10

    Medical Center Base Map NNMC and Key 54 CD Z Cl> < c.2 1 m OvOV SU3M u 0 0 ~~J~0 0 -~ U~~ ~ X<<w zC CA 5 .UC w 0 ZK 9 0 CY 9 L V)W go w r 0 ,- 05 U w w Og0...FUNDING NUMBERS CASE STUDY: NATIONAL NAVAL MEDICAL CENTER A GRADUATE MANAGEMENT PROJECT 6. AUTHOR(S) LIEUTENANT (JG) MELODY S. PEALE MEDICAL SERVICE CORPS...USNR 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. pPDV^-- -’" !nDf-AxTT7ATION NATIONAL NAVAL MEDICAL CENTER BETHESDA 8901 WISCONSIN AVE

  6. Graduate Financial Planning and Debt Management Brochure.

    ERIC Educational Resources Information Center

    Belmont, Jean

    Information on managing debt acquired by St. John's University graduate students is provided. The cost of education for a graduate student includes tuition, fees, books, home maintenance, personal expenses, and transportation. Student budgets for 1984-1985 and 1985-1986 (estimated) are provided by students' dependency status (dependent 9 months,…

  7. Sport Management Graduate Programs: Characteristics of Effectiveness.

    ERIC Educational Resources Information Center

    Li, Ming; And Others

    1994-01-01

    Reports a study that examined the characteristics that enable graduate sport management programs to achieve their objectives. Surveys of sport management educators found they agreed on 11 characteristics that indicated a sport management program's effectiveness. Respondents believed an effective program should produce sport managers, not…

  8. A Global Information Exchange (GIE) Project in a Graduate Course

    ERIC Educational Resources Information Center

    Thirunarayanan, M. O.; Coccaro-Pons, Jennifer

    2016-01-01

    Graduate students who were enrolled in an introductory educational technology course that met face-to-face completed a Global Information Exchange (GIE) project. The goal of the project was to promote global awareness among the graduate students who were also classroom teachers, and by extension their K-12 students. The graduate students, who also…

  9. Project-based learning as a contributing factor to graduates' work readiness

    NASA Astrophysics Data System (ADS)

    Jollands, Margaret; Jolly, Lesley; Molyneaux, Tom

    2012-05-01

    This paper explores what work readiness means for two cohorts of graduate engineers, one from a traditional curriculum, the second from a largely project-based curriculum. Professional bodies and employers have defined a set of attributes for engineering graduates so that graduates will be 'work ready'. Problem-based learning (PBL) is claimed to be a suitable approach to develop such skills. The graduates were interviewed some months after starting work, along with their managers. All the graduates recognised the benefits of taking PBL subjects as well as vacation work, with success in communication attributed more to PBL. Both cohorts had similar learning outcomes, high skill levels in project management, problem solving, communication skills, research and sustainability. A skills gap in ethics was identified for both cohorts of graduates and their managers. Further work is planned to link skill development with undergraduate learning experience.

  10. Demand Analysis for Proposed Medical Services at the Future Naval Health Clinic Charleston, South Carolina: A Graduate Management Project

    DTIC Science & Technology

    2006-04-26

    Enrollment Summary for Naval Hospital Charleston, Years 2004-2006 and 2007-2008 (Projected). From Tri-Service Business Planning Tool, Multi-Market...NHC in 2008 is 15,218 (Tri-Service Business Planning Tool, 2005) AD and ADFM enrollees. Early in the facility planning process, officials from Navy... Business Planning Tool was also used to gather baseline data pertaining to the beneficiary population, geographic distribution of beneficiaries, and

  11. Graduate Training: Evidence from FUSION Projects in Ireland

    ERIC Educational Resources Information Center

    Hegarty, Cecilia; Johnston, Janet

    2008-01-01

    Purpose: This paper aims to explore graduate training through SME-based project work. The views and behaviours of graduates are examined along with the perceptions of the SMEs and academic partner institutions charged with training graduates. Design/methodology/approach: The data are largely qualitative and derived from the experiences of…

  12. Arkansas Public High School Graduates, Projections to 1996-97.

    ERIC Educational Resources Information Center

    Spencer, Tom; Brenske, Deborah

    Projections to 1996-97 concerning Arkansas public high school graduates are examined. The state and county projections were prepared as a basic resource for institutions such as colleges and universities. Various considerations in projecting high school graduates are considered, including use of the Cohort Survival Technique, the importance of…

  13. 2012 Global Management Education Graduate Survey. Survey Report

    ERIC Educational Resources Information Center

    Leach, Laura

    2012-01-01

    Each year for the past 13 years, the Graduate Management Admission Council (GMAC) has conducted a survey of graduate management education students in their final year of business school. The Global Management Education Graduate Survey is distributed to students at participating schools. The survey allows students to express their opinions about…

  14. Global Management Education Graduate Survey, 2011. Survey Report

    ERIC Educational Resources Information Center

    Schoenfeld, Gregg

    2011-01-01

    Each year for the past 12 years, the Graduate Management Admission Council[R] (GMAC[R]) has conducted a survey of graduate management education students in their final year of business school. This Global Management Education Graduate Survey is distributed to students at participating business schools. The survey allows students to express their…

  15. Factors Affecting Academic Achievement in Graduate Management Education.

    ERIC Educational Resources Information Center

    Bieker, Richard F.

    1996-01-01

    Analysis of the academic achievement of 71 business administration graduates indicated that scores on the Graduate Management Admissions Test (GMAT) are more significant predictors of graduate performance than undergraduate performance is. The relationship between graduate performance and GMAT score differs for black students and white students.…

  16. Crossing the GEM Frontier: Graduate Admissions Professionals' Participation in Enrollment Management

    ERIC Educational Resources Information Center

    Campbell, C. Dean; Smith, Jahmaine

    2014-01-01

    Using qualitative inquiry and professional socialization as a framework to draw meaning from the work experiences of graduate admissions professionals, this project examines individual beliefs and organizational behaviors as they relate to enrollment management.

  17. Guide to Graduate Management Education, 81-82.

    ERIC Educational Resources Information Center

    Kurst, Charlotte, Ed.

    Information is presented on selecting and applying to graduate management programs, the Master of Business Administration (M.B.A.) degree, costs and financial aid, and concerns pertaining to minorities, women, and foreign students. Additionally, key facts about specific graduate schools of management, a description of the Graduate Management…

  18. Cooperative Learning in Graduate Student Projects: Comparing Synchronous versus Asynchronous Collaboration

    ERIC Educational Resources Information Center

    Strang, Kenneth

    2013-01-01

    Cooperative learning was applied in a graduate project management course to compare the effectiveness of asynchronous versus synchronous online team meetings. An experiment was constructed to allocate students to project teams while ensuring there was a balance of requisite skills, namely systems analysis and design along with HTML/Javascript…

  19. Competencies for Graduate Culinary Management Degree Programs: Stakeholders' Perspectives

    ERIC Educational Resources Information Center

    George, Annette A.

    2009-01-01

    Available literature on graduate hospitality education was highly focused on required competencies for hospitality management degree programs but not on culinary management. One possible explanation is that the culinary sector still lags behind in the formation of graduate culinary management programs in the United States. This causal comparative…

  20. Graduate level design - Courses and projects: An untapped resource

    NASA Technical Reports Server (NTRS)

    Dubrawsky, Ido; Neff, Jon M.; Pinon, Elfego, III; Fowler, Wallace T.

    1993-01-01

    The authors describe their experiences at a major space engineering university (the University of Texas at Austin) in the use of graduate level design courses and projects to produce information and tools that are of use to undergraduate design classes, graduate students, and industry. The information produced to date includes a spacecraft subsystems information document, a mission design tool (a FORTRAN subroutine library), a series of space mission characterizations, and a set of spacecraft characterizations.

  1. Evaluating the Predictive Validity of Graduate Management Admission Test Scores

    ERIC Educational Resources Information Center

    Sireci, Stephen G.; Talento-Miller, Eileen

    2006-01-01

    Admissions data and first-year grade point average (GPA) data from 11 graduate management schools were analyzed to evaluate the predictive validity of Graduate Management Admission Test[R] (GMAT[R]) scores and the extent to which predictive validity held across sex and race/ethnicity. The results indicated GMAT verbal and quantitative scores had…

  2. The Usefulness of Graduate Engineering Management Education for Military Officers.

    ERIC Educational Resources Information Center

    Tucker, Alan E. M.; And Others

    1984-01-01

    To prepare military and civilian engineers for middle and upper-level engineering management positions, the Air Force Institute of Technology offers a masters-level graduate engineering management program for the United States Air Force and other organizations. A study of this program's effectiveness, as perceived by graduates and their…

  3. Guidelines for Project Management

    NASA Technical Reports Server (NTRS)

    Ben-Arieh, David

    2001-01-01

    Project management is an important part of the professional activities at Kennedy Space Center (KSC). Project management is the means by which many of the operations at KSC take shape. Moreover, projects at KSC are implemented in a variety of ways in different organizations. The official guidelines for project management are provided by NASA headquarters and are quite general. The project reported herein deals with developing practical and detailed project management guidelines in support of the project managers. This report summarizes the current project management effort in the Process Management Division and presents a new modeling approach of project management developed by the author. The report also presents the Project Management Guidelines developed during the summer.

  4. Managing Projects for Change: Contextualised Project Management

    ERIC Educational Resources Information Center

    Tynan, Belinda; Adlington, Rachael; Stewart, Cherry; Vale, Deborah; Sims, Rod; Shanahan, Peter

    2010-01-01

    This paper will detail three projects which focussed on enhancing online learning at a large Australian distance education University within a School of Business, School of Health and School of Education. Each project had special funding and took quite distinctive project management approaches, which reflect the desire to embed innovation and…

  5. Employablity Skills among Graduates of Estate Management in Nigeria

    ERIC Educational Resources Information Center

    Egbenta, Idu Robert

    2015-01-01

    There is wide claim that employers have a high level of dissatisfaction associated with graduates from Nigeria higher institutions of learning. This paper examines whether graduates of estate management in Nigeria higher institutions have employability skills for productive employment. The study randomly sampled 59 principal partners or heads of…

  6. Projections of High School Graduates in the West.

    ERIC Educational Resources Information Center

    McConnell, William R.

    Individual state projections of the number of public high school graduates from 1979 through 1995 are presented for each of thirteen western states--Alaska, Arizona, California, Colorado, Hawaii, Idaho, Montana, Nevada, New Mexico, Oregon, Utah, Washington, and Wyoming. For each state, a four-page section presents detailed historical data,…

  7. A Symbiosis between Instructional Systems Design and Project Management

    ERIC Educational Resources Information Center

    Pan, Cheng-Chang

    2012-01-01

    This study is intended to explore a complementary relationship between instructional systems design (ISD) and project management in an attempt to build a plausible case for integrating project management as a distinct course in the core of the graduate instructional systems design programs. It is argued that ISD and project management should form…

  8. Project Risk Management

    NASA Technical Reports Server (NTRS)

    Jr., R. F. Miles

    1995-01-01

    Project risk management is primarily concerned with performance, reliability, cost, and schedule. Environmental risk management is primarily concerned with human health and ecological hazards and likelihoods. This paper discusses project risk management and compares it to environmental risk management, both with respect to goals and implementation. The approach of the Jet Propulsion Laboratory to risk management is presented as an example of a project risk management approach that is an extension to NASA NHB 7120.5: Management of Major System Programs and Projects.

  9. Harvard Observing Project (HOP): Undergraduate and graduate observing opportunities

    NASA Astrophysics Data System (ADS)

    Bieryla, Allyson; Newton, Elisabeth R.

    2014-06-01

    The Harvard Observing Project (HOP) engages undergraduate students in observational astronomy and gives graduate students extra teaching experience beyond their required teaching fellowships. This project offers students opportunities to see if they are interested in astronomy, introduces them to scientific research, and provides an opportunity for them to interact with graduate students in an informal setting. Observations are made using the 16” Clay Telescope atop the Science Center at Harvard University in Cambridge, MA. We have observed as part of the Pro-Am White dwarf Monitoring (PAWM) and Target Asteroids! projects, and most recently we have been monitoring SN2014J in the Messier 82 galaxy (see poster by M. McIntosh).

  10. Try-It-On: Experiential Learning of Holistic Stress Management in a Graduate Nursing Curriculum.

    PubMed

    Gregg, S Renee; Twibell, K Renee

    2016-09-01

    The aim of this article is to relate how nursing students in a graduate curriculum can learn, personally practice, and prepare to disseminate stress management strategies to patients. Advanced practice nurses often provide care for patients experiencing stress-related disorders while concurrently trying to manage their own high levels of stress. Through the innovative Try-It-On teaching-learning strategy, graduate students experimented with holistic stress management approaches, with the intention of sharing with patients what worked effectively. Student comments on course evaluations were positive regarding Try-It-On. In the pilot trial of a quantitative survey to expand the evaluation of the strategy, students who trialed holistic stress management techniques reported satisfaction, engagement, perceived relevance, and intention to trial techniques with patients in future clinical courses. Modeling role modeling theory and the Kirkpatrick evaluation model guided the project, which filled gaps in current knowledge about experiential learning in graduate nursing programs.

  11. Investment and Portfolio Management: The Development of a Graduate Level Business Course.

    ERIC Educational Resources Information Center

    Satterlee, Brian

    This paper describes the results of a project to develop a graduate-level business course in Investment and Portfolio Management for use in a Master of Business Administration degree program at Warner Southern College (Florida). The development of the course had three phases: (1) learning outcomes were derived from a literature review on…

  12. Spent Nuclear Fuel project, project management plan

    SciTech Connect

    Fuquay, B.J.

    1995-10-25

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  13. Profiles of Successful and Unsuccessful Graduate Engineering Management Students.

    DTIC Science & Technology

    1983-09-01

    Research Objective Three ......... GRE And GMAT . . . . . . . . . . . . . 97 Recommendations For Future Research . . . . 98 Summary...average of at least 2.5 on a 4.0 scale. 3. An acce ptable score on either the Graduate Manage- ment Admission Test ( GMAT ) or the Graduate Record...Examina- tion ( GMAT score of 500 or GRE score of 1000). 4. Mathematics through calculus with a grade of at least "C" (AFIT 1982-1984 Catalog, p. 10; Lee and

  14. Principles of project management

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The basic principles of project management as practiced by NASA management personnel are presented. These principles are given as ground rules and guidelines to be used in the performance of research, development, construction or operational assignments.

  15. Business and Practice Management Knowledge Deficiencies in Graduating Orthopedic Residents.

    PubMed

    Miller, D Joshua; Throckmorton, Thomas W; Azar, Frederick M; Beaty, James H; Canale, S Terry; Richardson, David R

    2015-10-01

    We conducted a study to determine the general level of knowledge that orthopedic residents have on business and practice management topics at graduation and to evaluate the level of knowledge that practicing orthopedic surgeons need in order to function effectively in a medical practice. Residency graduates from a single training program were asked to complete a survey that gathered demographic information and had surgeons rate their understanding of 9 general business and practice management skills and the importance of these skills in their current practice situation. The amount of necessary business knowledge they lacked at graduation was defined as a functional knowledge deficiency (FKD) and was calculated as the difference between the reported importance of a topic in current practice and the level of understanding of that topic at graduation (larger FKD indicates greater deficiency). Those in physician-managed practices reported significantly higher levels of understanding of economic analytical tools than those in nonphysician-managed practices. There were no other statistically significant differences among groups. Hospital-employed physicians had the lowest overall FKD (4.0), followed by those in academic practices (5.1) and private practices (5.9). Graduating orthopedic surgeons appear to be inadequately prepared to effectively manage business issues in their practices, as evidenced by the low overall knowledge levels and high FKDs.

  16. FLEXI Project Management Survey

    NASA Astrophysics Data System (ADS)

    Rohunen, Anna; Krzanik, Lech; Kuvaja, Pasi; Similä, Jouni; Rodriguez, Pilar; Hyysalo, Jarkko; Linna, Tommi

    FLEXI Project Management Survey (FLEXI PMS) has been established to gain detailed knowledge on how the software industry - in particular successful companies - manages agile software development. FLEXI PMS investigates the actual agile values, principles, practices and contexts. The survey is supported by a careful literature review and analysis of existing studies. Special attention is attached to large, multi-site, multi-company and distributed projects - the target area of FLEXI project. The survey is intended to provide solid data for further knowledge acquisition and project/company positioning with regard to feasible agile management practices.

  17. Managing Projects with KPRO

    NASA Technical Reports Server (NTRS)

    Braden, Barry M.

    2004-01-01

    How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.

  18. Scaffolding Project-Based Learning with the Project Management Body of Knowledge (PMBOK[R])

    ERIC Educational Resources Information Center

    van Rooij, Shahron Williams

    2009-01-01

    This paper reports the results of a study of the extent to which processes and procedures from the discipline of project management can scaffold online project-based learning in a graduate-level instructional technology course, by facilitating intra-team interaction, enhancing project outcomes and promoting a positive project team experience. With…

  19. Adapting Educational Materials in Data Management for Astronomy Graduate Students

    NASA Astrophysics Data System (ADS)

    Dietrich, D.

    2015-04-01

    The aim of this paper is to explore the process of creating a workshop in data management for astronomy graduate students. It will describe the motivation, process, and sources reviewed for such a workshop, concluding with an outline of the final workshop and lessons learned from the process. Many drivers have contributed to the growing interest in data management planning, including increased funder requirements for data management plans and an increased interest in libraries and information centers supporting data curation services.

  20. Mississippi graduate DOE EPSCor trainee project. First annual summary report

    SciTech Connect

    Wertz, D.L.

    1992-08-01

    The promotion of an aggressive energy research initiative was identified as a goal of the Mississippi Research Consortium (MRC) from its inception in 1986. The Department of Energy EPSCOR Program has provided opportunities to address the needs and enhance the interactive programs of energy-related research in the State of Mississippi. The Mississippi DOE EPSCOR Graduate Traineeships Project is a program of education and research which will (1) increase the number of trained professionals in the energy sciences and technology, particularly those from groups traditionally under-represented in the field, and (2) interface with existing networks of universities, industry, federal, and state institutions involved in energy-related activities.

  1. Mississippi graduate DOE EPSCor trainee project. [First Annual Summary Report

    SciTech Connect

    Wertz, D.L.

    1992-08-01

    The promotion of an aggressive energy research initiative was identified as a goal of the Mississippi Research Consortium (MRC) from its inception in 1986. The Department of Energy EPSCOR Program has provided opportunities to address the needs and enhance the interactive programs of energy-related research in the State of Mississippi. The Mississippi DOE EPSCOR Graduate Traineeships Project is a program of education and research which will (1) increase the number of trained professionals in the energy sciences and technology, particularly those from groups traditionally under-represented in the field, and (2) interface with existing networks of universities, industry, federal, and state institutions involved in energy-related activities.

  2. Project Management for International Development.

    ERIC Educational Resources Information Center

    Axelrod, Valija M.; Magisos, Joel H.

    A project developed a content model for international project management training. It also compiled a bibliography of project management references, identified specific project management training needs based upon a survey of international sponsors and contractor personnel, and documented the training needs of international project managers. Data…

  3. Project-Based Learning as a Contributing Factor to Graduates' Work Readiness

    ERIC Educational Resources Information Center

    Jollands, Margaret; Jolly, Lesley; Molyneaux, Tom

    2012-01-01

    This paper explores what work readiness means for two cohorts of graduate engineers, one from a traditional curriculum, the second from a largely project-based curriculum. Professional bodies and employers have defined a set of attributes for engineering graduates so that graduates will be "work ready". Problem-based learning (PBL) is…

  4. Ace Project as a Project Management Tool

    ERIC Educational Resources Information Center

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  5. Piecing Together the Puzzle of Graduate Employment: Factors that Shape the Graduate Work Expectations of Human Resource Management Students

    ERIC Educational Resources Information Center

    Parris, Melissa A.; Saville, Kerrie

    2011-01-01

    Providing graduates with a set of skills and attributes relevant to their future employment remains a key topic in both higher education policy and research. This paper reports findings from a pilot study of human resource management (HRM) students' perceptions of the graduate work experience. Specifically, it focuses on how these perceptions are…

  6. Project management tool

    NASA Technical Reports Server (NTRS)

    Maluf, David A. (Inventor); Gawdiak, Yuri O. (Inventor); Bell, David G. (Inventor); Gurram, Mohana M. (Inventor)

    2009-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as a monthly report, a task plan report, a budget report and a risk management report, are generated and made available for display or further analysis. An extensible database allows searching for information based upon context and upon content.

  7. Campus Energy Management Projects.

    ERIC Educational Resources Information Center

    Welzenbach, Lanora, Ed.

    This publication is a compilation of data concerning energy conservation measures at more than 60 colleges and universities in the United States and Canada. The data are presented for the information of all who are interested in the variety of ways in which institutions of higher education are managing energy. Project descriptions are divided into…

  8. Enhanced project management tool

    NASA Technical Reports Server (NTRS)

    Maluf, David A. (Inventor); Hsu, Chen-Jung (Inventor); Patel, Hemil N. (Inventor); Moh Hashim, Jairon C. (Inventor); Tran, Khai Peter B. (Inventor)

    2012-01-01

    A system for managing a project that includes multiple tasks and a plurality of workers. Input information includes characterizations based upon a human model, a team model and a product model. Periodic reports, such as one or more of a monthly report, a task plan report, a schedule report, a budget report and a risk management report, are generated and made available for display or further analysis or collection into a customized report template. An extensible database allows searching for information based upon context and upon content. Seven different types of project risks are addressed, including non-availability of required skill mix of workers. The system can be configured to exchange data and results with corresponding portions of similar project analyses, and to provide user-specific access to specified information.

  9. Project Management: Essential Skill of Nurse Informaticists.

    PubMed

    Sipes, Carolyn

    2016-01-01

    With the evolution of nursing informatics (NI), the list of skills has advanced from the original definition that included 21 competencies to 168 basic competencies identified in the TIGER-based Assessment of Nursing Informatics Competencies (TANIC) and 178 advanced skills in the Nursing Informatics Competency Assessment (NICA) L3/L4 developed by Chamberlain College of Nursing, Nursing Informatics Research Team (NIRT). Of these competencies, project management is one of the most important essentials identified since it impacts all areas of NI skills and provides an organizing framework for processes and projects including skills such as design, planning, implementation, follow-up and evaluation. Examples of job roles that specifically require project management skills as an essential part of the NI functions include management, administration, leadership, faculty, graduate level master's and doctorate practicum courses. But first, better understanding of the NI essential skills is vital before adequate education and training programs can be developed.

  10. Project Management Methodology in Human Resource Management

    ERIC Educational Resources Information Center

    Josler, Cheryl; Burger, James

    2005-01-01

    When charged with overseeing a project, how can one ensure that the project will be completed on time, within budget, and to the satisfaction of everyone involved? In this article, the authors examine project management methodology as a means of ensuring that projects are conducted in a disciplined, well-managed and consistent manner that serves…

  11. Program and Project Management Framework

    NASA Technical Reports Server (NTRS)

    Butler, Cassandra D.

    2002-01-01

    The primary objective of this project was to develop a framework and system architecture for integrating program and project management tools that may be applied consistently throughout Kennedy Space Center (KSC) to optimize planning, cost estimating, risk management, and project control. Project management methodology used in building interactive systems to accommodate the needs of the project managers is applied as a key component in assessing the usefulness and applicability of the framework and tools developed. Research for the project included investigation and analysis of industrial practices, KSC standards, policies, and techniques, Systems Management Office (SMO) personnel, and other documented experiences of project management experts. In addition, this project documents best practices derived from the literature as well as new or developing project management models, practices, and techniques.

  12. Nurturing Graduate Students: Integrative Scholarship through Textbook Projects.

    ERIC Educational Resources Information Center

    Zinn, Maxine Baca; Eitzen, D. Stanley

    2000-01-01

    Believes that graduate students can gain skills that will help them in the future by participating in the textbook writing process. Describes six activities for graduate students including preparing a text-reader for a course, writing a panel essay for a textbooks, and acting as a textbook intern. (CMK)

  13. Technical Publications as Graduate Class Projects: Advantages and Potential Disadvantages

    ERIC Educational Resources Information Center

    Copenheaver, Carolyn A.; Predmore, S. Andrew; Fuhrman, Nicholas E.

    2016-01-01

    Graduate students are rewarded with better job opportunities if they can demonstrate a productive publishing record. In this article we report on a writing program that generated technical publications in a discipline-based graduate class. Seventeen student authors were interviewed about the influence of the experience on their professional…

  14. Knocking at the College Door: Projections of High School Graduates. Washington

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Washington related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  15. Knocking at the College Door: Projections of High School Graduates. North Dakota

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for North Dakota related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  16. Knocking at the College Door: Projections of High School Graduates. New Hampshire

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for New Hampshire related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  17. Knocking at the College Door: Projections of High School Graduates. Wyoming

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Wyoming related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  18. Knocking at the College Door: Projections of High School Graduates. New Jersey

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for New Jersey related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  19. Knocking at the College Door: Projections of High School Graduates. Maine

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Maine related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  20. Knocking at the College Door: Projections of High School Graduates. South Dakota

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for South Dakota related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  1. Knocking at the College Door: Projections of High School Graduates. Oregon

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Oregon related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  2. Knocking at the College Door: Projections of High School Graduates. New York

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for New York related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  3. Knocking at the College Door: Projections of High School Graduates. Colorado

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Colorado related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  4. Knocking at the College Door: Projections of High School Graduates. Nevada

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Nevada related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  5. Knocking at the College Door: Projections of High School Graduates. Pennsylvania

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Pennsylvania related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  6. Knocking at the College Door: Projections of High School Graduates. Utah

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Utah related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  7. Knocking at the College Door: Projections of High School Graduates. California

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for California related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  8. Knocking at the College Door: Projections of High School Graduates. Montana

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Montana related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  9. Knocking at the College Door: Projections of High School Graduates. Idaho

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Idaho related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  10. Knocking at the College Door: Projections of High School Graduates. New Mexico

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for New Mexico related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  11. Knocking at the College Door: Projections of High School Graduates. Vermont

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Vermont related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  12. Knocking at the College Door: Projections of High School Graduates. Hawaii

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Hawaii related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  13. Knocking at the College Door: Projections of High School Graduates. Maryland

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Maryland related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  14. Knocking at the College Door: Projections of High School Graduates. Kentucky

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Kentucky related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  15. Knocking at the College Door: Projections of High School Graduates. Virginia

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Virginia related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  16. Knocking at the College Door: Projections of High School Graduates. South Carolina

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for South Carolina related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  17. Knocking at the College Door: Projections of High School Graduates. Arizona

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Arizona related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  18. Knocking at the College Door: Projections of High School Graduates. Ohio

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Ohio related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  19. Knocking at the College Door: Projections of High School Graduates. Texas

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Texas related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  20. Knocking at the College Door: Projections of High School Graduates. Delaware

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Delaware related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  1. Knocking at the College Door: Projections of High School Graduates. Wisconsin

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Wisconsin related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  2. Knocking at the College Door: Projections of High School Graduates. Indiana

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Indiana related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  3. Knocking at the College Door: Projections of High School Graduates. Georgia

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Georgia related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  4. Knocking at the College Door: Projections of High School Graduates. Alabama

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Alabama related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  5. Knocking at the College Door: Projections of High School Graduates. Oklahoma

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Oklahoma related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  6. Knocking at the College Door: Projections of High School Graduates. Minnesota

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Minnesota related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  7. Knocking at the College Door: Projections of High School Graduates. Michigan

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Michigan related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  8. Knocking at the College Door: Projections of High School Graduates. North Carolina

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for North Carolina related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  9. Knocking at the College Door: Projections of High School Graduates. West Virginia

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for West Virginia related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  10. Knocking at the College Door: Projections of High School Graduates. Alaska

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Alaska related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  11. Knocking at the College Door: Projections of High School Graduates. Florida

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Florida related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  12. Knocking at the College Door: Projections of High School Graduates. District of Columbia

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for District of Columbia related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient…

  13. Knocking at the College Door: Projections of High School Graduates. Mississippi

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Mississippi related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  14. Knocking at the College Door: Projections of High School Graduates. Iowa

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Iowa related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  15. Knocking at the College Door: Projections of High School Graduates. Tennessee

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Tennessee related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  16. Knocking at the College Door: Projections of High School Graduates. Louisiana

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Louisiana related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  17. Knocking at the College Door: Projections of High School Graduates. Illinois

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Illinois related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  18. Knocking at the College Door: Projections of High School Graduates. Arkansas

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Arkansas related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  19. Knocking at the College Door: Projections of High School Graduates. Massachusetts

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Massachusetts related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  20. Knocking at the College Door: Projections of High School Graduates. Connecticut

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Connecticut related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  1. Knocking at the College Door: Projections of High School Graduates. Missouri

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Missouri related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  2. Knocking at the College Door: Projections of High School Graduates. Nebraska

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Nebraska related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  3. Knocking at the College Door: Projections of High School Graduates. Kansas

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Kansas related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  4. Knocking at the College Door: Projections of High School Graduates. Rhode Island

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2013

    2013-01-01

    National and regional trends mask important variation among states in the supply of high school graduates. This profile provides brief indicators for Rhode Island related to: current levels of educational attainment, projections of high school graduates into the future, and two common barriers to student access and success--insufficient academic…

  5. Information Management Graduates' Accounts of Their Employability: A Case Study from the University of Sheffield

    ERIC Educational Resources Information Center

    Cox, Andrew M.; Al Daoud, Mohammad; Rudd, Stephanie

    2013-01-01

    Ensuring that graduates are employable is an important priority for universities. It is challenging for fields such as Information Management (IM), that are not fully understood by employers and where there is no very clearly defined entry level job market. This paper takes a graduate identity perspective to explore how IM graduates from the…

  6. Maximum Capital Project Management.

    ERIC Educational Resources Information Center

    Adams, Matt

    2002-01-01

    Describes the stages of capital project planning and development: (1) individual capital project submission; (2) capital project proposal assessment; (3) executive committee; and (4) capital project execution. (EV)

  7. BC Medication Management Project

    PubMed Central

    Henrich, Natalie; Tsao, Nicole; Gastonguay, Louise; Lynd, Larry

    2015-01-01

    Background: The BC Medication Management Project (BCMMP) was developed by the BC Ministry of Health and the BC Pharmacy Association. This pilot project ran from September 2010 to January 2012. Pharmacists reviewed patients’ medication histories, discussed best use of medications, provided education and monitored for adverse effects, developed a plan to deal with medication issues and created a best possible medication history. Methods: To evaluate the experience of participating in the BCMMP, challenges and strengths of the project and the alignment of these experiences with the overarching goals, focus groups and interviews were conducted with 6 stakeholder groups. Themes were compared within and across stakeholder type and descriptively analyzed. Results: A total of 88 people participated in the focus groups/interviews. Pharmacists stated that providing BCMMP services was professionally satisfying and concurred with patients that the service did benefit them. However, participating in the BCMMP was not seen as financially sustainable by pharmacy owners, and there were concerns about patient selection. Physicians expressed concerns about increased workload associated with the BCMMP, for which they were not compensated. The computer system and burden of documentation were identified as the greatest problems. Conclusions: The BCMMP pilot project was enthusiastically received by pharmacists and patients who felt that it benefited patients and moved the pharmacy profession in a positive direction. It was widely felt that the BCMMP could be successful and sustainable if the identified challenges are addressed. PMID:25983759

  8. Comparability of Scores on Word-Processed and Handwritten Essays on the Graduate Management Admissions Test.

    ERIC Educational Resources Information Center

    Bridgeman, Brent; Cooper, Peter

    Essays for the Graduate Management Admissions Test must be written with a word processor (except in some foreign countries). The test sponsors, the Graduate Management Admissions Council, believed that this is fair because some word processing skill is a prerequisite for advanced management education. Furthermore, it might also be unfair to…

  9. Contemporary Management and Operations Research Graduate Programs: A Review, Recommendations, and Integration.

    ERIC Educational Resources Information Center

    Petrick, Joseph A.; Polak, George G.; Scherer, Robert F.; Munoz, Carmen Gloria

    2001-01-01

    Criticisms of graduate management education have led to changes in the balance between business and academic standards, strategic leadership, curriculum, faculty performance incentives, graduate proficiencies, and relations with the business community. Operations management/management sciences have similarly changed in terms of curricular…

  10. A Multi-Institutional Project to Develop Discipline-Specific Data Literacy Instruction for Graduate Students

    NASA Astrophysics Data System (ADS)

    Wright, S. J.; Fosmire, M.; Jeffryes, J.; Stowell Bracke, M.; Westra, B.

    2012-12-01

    What data stewardship skills are needed by future scientists to fulfill their professional responsibilities and take advantage of opportunities in e-science? How can academic librarians contribute their expertise in information organization, dissemination and preservation to better serve modern science? With support from the Institute of Museum and Library Services (IMLS), four research libraries have formed a partnership to address these questions. The aims of the partnership are to identify the data stewardship skills, including data management and curation, needed by graduate students at the research discipline level, to identify trends that extend across the Science, Technology, Engineering, and Mathematics (STEM) disciplines, and to collaborate with faculty to develop and implement "data information literacy" (DIL) curricula to address those needs. Over the course of the first year, the authors have been working closely with faculty in hydrology, civil engineering, ecology/environmental science, and natural resources. At the outset, we performed structured interviews with faculty and graduate students using a modified version of the Data Curation Profiles Toolkit (http://datacurationprofiles.org) to gather detailed information about the practices, limitations, needs, and opportunities for improving data management and curation practices in each group. Project teams also conducted discipline-based literature reviews and environmental scans of the available resources pertaining to data management and curation issues to identify how (or if) these topics are currently addressed by the discipline. The results were used to develop and implement specific instructional interventions attuned to the needs of each research group. We will share the results of our interviews and information-gathering, summarizing similarities and differences in the data stewardship needs expressed by the graduate students and faculty from different STEM disciplines. We will also discuss

  11. Project Management in Higher Education

    ERIC Educational Resources Information Center

    Alpert, Shannon Atkinson

    2011-01-01

    This study identified factors that influenced the use of project management in higher education research projects. Using a qualitative grounded theory approach that included in-depth interviews with assistant professors, the researcher examined how these individuals were using project management processes and tools and factors that enabled,…

  12. The Graduate Attributes We've Overlooked: Enhancing Graduate Employability through Career Management Skills

    ERIC Educational Resources Information Center

    Bridgstock, Ruth

    2009-01-01

    Recent shifts in education and labour market policy have resulted in universities being placed under increasing pressure to produce employable graduates. However, contention exists regarding exactly what constitutes employability and which graduate attributes are required to foster employability in tertiary students. This paper argues that in the…

  13. Enrollment Management Trends Report, 2012: A Snapshot of the 2011 ACT-Tested High School Graduates

    ERIC Educational Resources Information Center

    ACT, Inc., 2012

    2012-01-01

    ACT created the "Enrollment Management Trends Report" to provide enrollment managers and other college administrators with information about students' patterns during the college choice process of the 2011 high school graduates who took the ACT[R] test. More than 1.6 million students--roughly half of the graduating class of 2011--took…

  14. Using a Design-Orientated Project to Attain Graduate Attributes

    ERIC Educational Resources Information Center

    Moalosi, Richie; Molokwane, Shorn; Mothibedi, Gabriel

    2012-01-01

    Nowadays universities are required not only to impart knowledge of specific disciplines but also generic graduate attributes such as communication, problem-solving, teamwork, creative thinking, research and inquiry skills. For students to attain these generic skills, educators are encouraged to use learner-centred approaches in teaching.…

  15. Defining Projects to Integrate Evolving Team Fundamentals and Project Management Skills

    ERIC Educational Resources Information Center

    Smith, Harold, III; Smarkusky, Debra; Corrigall, Elizabeth

    2008-01-01

    Industry has indicated the desire for academic programs to produce graduates that are well-versed in collaborative problem solving and general project management concepts in addition to technical skills. The primary focus of a curriculum is typically centered on the technical training with minimal attention given to coalescing team and project…

  16. Reflecting on "Project Katrina" and Developmentally Appropriate Practices: A Graduate Student's Perspective

    ERIC Educational Resources Information Center

    Schellhaas, Andree; Burts, Diane C.; Aghayan, Carol

    2007-01-01

    This article describes the independent study project of a student who was a graduate assistant in a child development laboratory preschool when Hurricanes Katrina and Rita struck the Gulf Coast area. Through her experiences with "Project Katrina" she deepens her understanding of developmentally appropriate practices as she learns firsthand about…

  17. Fostering Experiential Learning and Service through Client Projects in Graduate Business Courses Offered Online

    ERIC Educational Resources Information Center

    Hagan, Linda M.

    2012-01-01

    Undergraduate marketing and public relations capstone courses utilize client projects to allow students to apply their knowledge and encourage collaboration. Yet, at the graduate level, especially with courses offered in an online modality, experiential service learning in the form of client project assignments presents unique challenges. However,…

  18. Project-Based Learning in Colleges of Business: Is It Enough to Develop Educated Graduates?

    ERIC Educational Resources Information Center

    Smith, Penny Pence; Gibson, Lindsey A.

    2016-01-01

    This chapter focuses on project-based learning in colleges of business, a concept that offers the student a "hands-on" approach to knowledge by working on actual projects with business community organizations. However, it may take more than such partnerships to assure graduates become "educated people" as well as those…

  19. Application of Project Portfolio Management

    NASA Astrophysics Data System (ADS)

    Pankowska, Malgorzata

    The main goal of the chapter is the presentation of the application project portfolio management approach to support development of e-Municipality and public administration information systems. The models of how people publish and utilize information on the web have been transformed continually. Instead of simply viewing on static web pages, users publish their own content through blogs and photo- and video-sharing slides. Analysed in this chapter, ICT (Information Communication Technology) projects for municipalities cover the mixture of the static web pages, e-Government information systems, and Wikis. So, for the management of the ICT projects' mixtures the portfolio project management approach is proposed.

  20. NICA project management information system

    NASA Astrophysics Data System (ADS)

    Bashashin, M. V.; Kekelidze, D. V.; Kostromin, S. A.; Korenkov, V. V.; Kuniaev, S. V.; Morozov, V. V.; Potrebenikov, Yu. K.; Trubnikov, G. V.; Philippov, A. V.

    2016-09-01

    The science projects growth, changing of the efficiency criteria during the project implementation require not only increasing of the management specialization level but also pose the problem of selecting the effective planning methods, monitoring of deadlines and interaction of participants involved in research projects. This paper is devoted to choosing the project management information system for the new heavy-ion collider NICA (Nuclotron based Ion Collider fAcility). We formulate the requirements for the project management information system with taking into account the specifics of the Joint Institute for Nuclear Research (JINR, Dubna, Russia) as an international intergovernmental research organization, which is developed on the basis of a flexible and effective information system for the NICA project management.

  1. The Project Manager's Tool Kit

    NASA Technical Reports Server (NTRS)

    Cameron, W. Scott

    2003-01-01

    Project managers are rarely described as being funny. Moreover, a good sense of humor rarely seems to be one of the deciding factors in choosing someone to be a project manager, or something that pops up as a major discussion point at an annual performance review. Perhaps this is because people think you aren't serious about your work if you laugh. I disagree with this assessment, but that's not really my point. As I talk to people either pursuing a career in project management, or broadening their assignment to include project management, I encourage them to consider what tools they need to be successful. I suggest that they consider any strength they have to be part of their Project Management (PM) Tool Kit, and being funny could be one of the tools they need.

  2. 6 Project-Management Tips

    ERIC Educational Resources Information Center

    Demski, Jennifer

    2012-01-01

    When it comes to project management, the IT department is typically its own worst enemy. When project requests are pushed through the budgeting process by different departments, it's up to IT to make them all work. The staff is required to be "heroic" to get the project load done. People get to work over weekends and postpone their vacations. The…

  3. Waste Management Process Improvement Project

    SciTech Connect

    Atwood, J.; Borden, G.; Rangel, G. R.

    2002-02-25

    The Bechtel Hanford-led Environmental Restoration Contractor team's Waste Management Process Improvement Project is working diligently with the U.S. Department of Energy's (DOE) Richland Operations Office to improve the waste management process to meet DOE's need for an efficient, cost-effective program for the management of dangerous, low-level and mixed-low-level waste. Additionally the program must meet all applicable regulatory requirements. The need for improvement was highlighted when a change in the Groundwater/Vadose Zone Integration Project's waste management practices resulted in a larger amount of waste being generated than the waste management organization had been set up to handle.

  4. Project Hanford management contract quality improvement project management plan

    SciTech Connect

    ADAMS, D.E.

    1999-03-25

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process.

  5. United States Air Force Graduate Student Summer Support Program (1985). Management Report.

    DTIC Science & Technology

    1985-12-01

    Clasification) United States Air Force Graduate Student Su er Support rogram - Program Manag -ment Repoi 12. PERSONAL AUTHOR(S) Rodney C. Darrah, Susan K. Espy 13...Major Amos Otis, Program Manager (202) 767-4970 XOT I I 2DISTORIBUTIO,/A VALAREDITION OF JAN A C IS OBSOLETE CA D FORM 1473, 83 APR EDIIO OF1...8217. .- ,. *.. . . ,. €. * j*.,P ’. ... : ’ UNITED STATES AIR FORCE GRADUATE STUDENT SUMMER SUPPORT PROGRAM 1985 PROGRAM MANAGEMENT REPORT - UNIVERSAL

  6. Enrolment Management in Graduate Business Programs: Predicting Student Retention

    ERIC Educational Resources Information Center

    Eshghi, Abdoloreza; Haughton, Dominique; Li, Mingfei; Senne, Linda; Skaletsky, Maria; Woolford, Sam

    2011-01-01

    The increasing competition for graduate students among business schools has resulted in a greater emphasis on graduate business student retention. In an effort to address this issue, the current article uses survival analysis, decision trees and TreeNet® to identify factors that can be used to identify students who are at risk of dropping out of a…

  7. Test Takers' Attitudes and Beliefs about the Graduate Management Admission Test

    ERIC Educational Resources Information Center

    Stricker, Lawrence J.; Wilder, Gita Z.; Bridgeman, Brent

    2006-01-01

    The aim of this study was to assess test takers' attitudes and beliefs about an admissions test used extensively in graduate schools of business in the United States, the Graduate Management Admission Test (GMAT), and the relationships of these attitudes and beliefs to test performance. A set of attitude and belief items was administered by…

  8. 2013 Graduate Management Education in Canada. GMAC® Data-to-Go Series

    ERIC Educational Resources Information Center

    Graduate Management Admission Council, 2013

    2013-01-01

    This latest report in the GMAC® Data-to-Go Series provides an overview of trends in graduate management education in Canada and a brief look at jobs and employment trends for recent 2013 business school graduates in Canada. Key themes of internationalization, program portfolio, and student recruitment appear in data throughout. Data presented here…

  9. Quality of Education Outcomes: The Role of the Graduate Management Admission Test

    ERIC Educational Resources Information Center

    Wamala, Robert; Buyinza, Mukadasi

    2013-01-01

    Although the Graduate Management Admission Test (GMAT) is considered by leading business institutions worldwide as a predictor of success in graduate programs, an issue of contention is whether the introduction of the examination enhances the quality of education outcomes. This study sought to obtain an understanding of this issue, focusing on…

  10. Assessing Practical Intelligence in Business School Admissions: A Supplement to the Graduate Management Admissions Test

    ERIC Educational Resources Information Center

    Hedlund, Jennifer; Wilt, Jeanne M.; Nebel, Kristina L.; Ashford, Susan J.; Sternberg, Robert J.

    2006-01-01

    The Graduate Management Admission Test (GMAT) is the most widely used measure of managerial potential in MBA admissions. GMAT scores, although predictive of grades in business school, leave much of the variance in graduate school performance unexplained. The GMAT also produces disparities in test scores between groups, generating the potential for…

  11. Evaluation of Hotel, Restaurant, and Institutional Management Graduates: A Ten Year Review.

    ERIC Educational Resources Information Center

    Johnson, Dona, Comp.; And Others

    A study of graduates from the Hotel, Restaurant, and Institutional Management program at St. Louis Community College at Forest Park was conducted, primarily in order to elicit information from graduates regarding potentially effective recruitment methods for minority groups and women. The study also sought to obtain evaluation of course curriculum…

  12. Exploring Predictors of Graduate School and Career Success: A Case Study in Sport Management

    ERIC Educational Resources Information Center

    LeCrom, Carrie; Rufer, Lisa; Slavich, Mark; Dwyer, Brendan; Greenhalgh, Gregory

    2016-01-01

    The following case study attempted to assess what factors contribute to graduate school and early-career success among sport management graduate students. As faculty members charged with admitting the next generation of leaders in the sport industry, how should admissions decisions be made and what factors should be considered? The authors…

  13. A Behavior Management Seminar for Special or General Education Graduate Students

    ERIC Educational Resources Information Center

    Schindelheim, Franklin D.

    2010-01-01

    The purpose of this qualitative study was to identify the classroom management needs of graduate education students in one college, and develop a seminar that emerged from the research. Researchers have shown that professional development provided for graduate education students typically deals with curriculum and instructional methodologies…

  14. Virtually Stress Free: Keeping Online Graduate Management Students Healthy from Afar

    ERIC Educational Resources Information Center

    Martinak, M. Linda

    2012-01-01

    This article examines stress experienced by graduate management students in an online learning environment. I use qualitative methodology to examine data collected from 32 students in 2 sections of a graduate online course. Findings identify 6 categories of stressors experienced by the students as well as 6 categories of stress relief agents.…

  15. Evaluating the Skills Strategy through a Graduate Certificate in Management: An Experiential Learning Theory Approach

    ERIC Educational Resources Information Center

    Butler, Michael J. R.; Gheorghiu, Lidia

    2010-01-01

    Purpose: The purpose of this paper is to evaluate how a UK business school is addressing the Government's skills strategy through its Graduate Certificate in Management, and to identify good practice and development needs and to clarify how the Graduate Certificate is adapting to the needs of Generation X and Millennial students. The paper also…

  16. Managing a project's legacy: implications for organizations and project management

    NASA Technical Reports Server (NTRS)

    Cooper, Lynne P.; Hecht, Michael H.; Majchrzak, Ann

    2003-01-01

    Organizations that rely on projects to implement their products must find effective mechanisms for propagating lessons learned on one project throughout the organization. A broad view of what constitutes a project's 'legacy' is presented that includes not just the design products and leftover parts, but new processes, relationships, technology, skills, planning data, and performance metrics. Based on research evaluating knowledge reuse in innovative contexts, this paper presents an approach to project legacy management that focuses on collecting and using legacy knowledge to promote organizational learning and effective reuse, while addressing factors of post-project responsibility, information obsolescence, and the importance of ancillary contextual information. .

  17. Utilizing Applied Projects in Industrial/Organizational Psychology Graduate Training: A Checklist To Help Ensure Successful Experiences.

    ERIC Educational Resources Information Center

    Shoenfelt, Elizabeth L.

    The scientist-practitioner model indicates graduate education must focus on application in addition to theory. Although a number of approaches may be utilized to gain applied experience for students, this paper focuses on applied projects completed as a requirement of a graduate course. Finding host organizations for class projects presents unique…

  18. Profile of Graduate Management Admission Test[R] Candidates 2007-08 to 2011-12: Five-Year Summary

    ERIC Educational Resources Information Center

    Graduate Management Admission Council, 2012

    2012-01-01

    The 2011-2012 testing year held a number of significant milestones for the Graduate Management Admission Test exam. A total of 286,529 GMAT exams were administered, with 831,337 score reports sent to more than 5,200 graduate-level management programs around the world--all record numbers. This record volume reflects the increase in graduate-level…

  19. Building axiological competence of graduate students by means of project-based learning

    NASA Astrophysics Data System (ADS)

    Gilmanshina, S. I.; Gilmanshin, I. R.

    2015-06-01

    The article defines the essence of axiological competence, objectives and pedagogical conditions of its formation among the students of graduate program in Biotechnology. The authors provide requirements for energy-saving technologies project-based learning and specify the application of the latter with the view of competence building.

  20. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The...

  1. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The...

  2. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The...

  3. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The...

  4. River Protection Project (RPP) Project Management Plan

    SciTech Connect

    NAVARRO, J.E.

    2001-03-07

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation.

  5. Adopting eXtreme Programming on a Graduate Student Project

    SciTech Connect

    Popovsky, Barbara; Frincke, Deborah A.; Seifert, Christian

    2005-06-17

    At the 2004 IA Workshop, the University of Washington (UW) and Seattle University (SU) presented a student project for cataloging compromised system images, built under the auspices of the Pacific Northwest Honeynet (PNW-honeynet) which is a Honeynet Project Research Alliance member group. [1, 2] Of interest to the workshop audience was not only the functionality of the project itself, but also the method by which it was built—a variation of eXtreme Programming [3]—and how it was taught. This analysis is presented in response to those questions. The pedagogical approach presented in this paper is applicable to the development of any new curriculum or learning experience and is designed to deliver predictable and repeatable student outcomes regardless of the content delivered or background of the instructor.

  6. Waste Management Project Contingency Analysis

    SciTech Connect

    Edward L. Parsons, Jr.

    1999-08-31

    The purpose of this report is to provide the office of Waste Management (WM) with recommended contingency calculation procedures for typical WM projects. Typical projects were defined as conventional construction-type activities that use innovative elements when necessary to meet the project objectives. Projects involve treatment, storage, and disposal of low level, mixed low level, hazardous, transuranic, and high level waste. Cost contingencies are an essential part of Total Cost Management. A contingency is an amount added to a cost estimate to compensate for unexpected expenses resulting from incomplete design, unforeseen and unpredictable conditions, or uncertainties in the project scope (DOE 1994, AACE 1998). Contingency allowances are expressed as percentages of estimated cost and improve cost estimates by accounting for uncertainties. The contingency allowance is large at the beginning of a project because there are more uncertainties, but as a project develops, the allowance shrinks to adjust for costs already incurred. Ideally, the total estimated cost remains the same throughout a project. Project contingency reflects the degree of uncertainty caused by lack of project definition, and process contingency reflects the degree of uncertainty caused by use of new technology. Different cost estimation methods were reviewed and compared with respect to terminology, accuracy, and Cost Guide standards. The Association for the Advancement of Cost Engineering (AACE) methods for cost estimation were selected to represent best industry practice. AACE methodology for contingency analysis can be readily applied to WM Projects, accounts for uncertainties associated with different stages of a project, and considers both project and process contingencies and the stage of technical readiness. As recommended, AACE contingency allowances taper off linearly as a project nears completion.

  7. Testing for Bias against Female Test Takers of the Graduate Management Admissions Test and Potential Impact on Admissions to Graduate Programs in Business.

    ERIC Educational Resources Information Center

    Wright, Robert E.; Bachrach, Daniel G.

    2003-01-01

    Graduate Management Admission Test (GMAT) scores and grade point average in graduate core courses were compared for 190 male and 144 female business administration students. No significant differences in course performance were found, but males had been admitted with significantly higher GMAT scores, suggesting a bias against women. (Contains 27…

  8. How Project Managers Really Manage: An Indepth Look at Some Managers of Large, Complex NASA Projects

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.; Impaeilla, Cliff (Technical Monitor)

    2000-01-01

    This paper reports on a research study by the author that examined ten contemporary National Aeronautics and Space Administration (NASA) complex projects. In-depth interviews with the project managers of these projects provided qualitative data about the inner workings of the project and the methodologies used in establishing and managing the projects. The inclusion of a variety of space, aeronautics, and ground based projects from several different NASA research centers helped to reduce potential bias in the findings toward any one type of project, or technical discipline. The findings address the participants and their individual approaches. The discussion includes possible implications for project managers of other large, complex, projects.

  9. Managers, Movers and Missionaries: Who Leads the Graduate School?

    ERIC Educational Resources Information Center

    Lindt, Gillian

    1990-01-01

    The paper outlines the advantages of fixed term appointments for graduate school deans, discusses the character of decanal leadership, and explores the place of power and authority within leadership. Decanal leadership is described as the process by which deans induce faculty, students, university administrators, and alumni to further the…

  10. Project management at a university

    NASA Astrophysics Data System (ADS)

    Eaton, Joel A.

    2006-06-01

    Managing instrumentation projects, large or small, involves a number of common challenges-defining what is needed, desiging a system to provide it, producing it in an economical way, and putting it into service expeditiously. Doing these things in a university environoment provides unique challenges and opportunities not obtaining in the environment of large projects at NASA or national labs. I address this topic from the viewpoint of knowledge of two such projects, the development of OAO-2 at the University of Wisconsin and the relocation of Fairborn Observatory to the Patagonia Mountains in Arizona, as well as my own developemnt of the Tennessee State 2-m Automatic Spectroscopic Telescope. For the university environment, I argue for a more traditional management style that relies on more informal techniques than those used in large-scale projects conducted by big bureaucratic institutions. This style identifies what tasks are really necessary and eliminates as much wasteful overhead as possible. I discuss many of the formalities used in project management, such as formal reviews (PDR, CDR, etc.) and Gantt charts, and propose other ways of acheving the same results more effectively. The university environment acutely requires getting the right people to do the project, both in terms of their individual personalities, motivation, and technical skills but also in terms of their ability to get on with one another. Two critical challenges confronting those doing such projects in universities are 1) keeping the contractors on task (the major challenge to anyone doing project management) and 2) dealing with the purchasing systems in such institutions.

  11. Software Tools Streamline Project Management

    NASA Technical Reports Server (NTRS)

    2009-01-01

    Three innovative software inventions from Ames Research Center (NETMARK, Program Management Tool, and Query-Based Document Management) are finding their way into NASA missions as well as industry applications. The first, NETMARK, is a program that enables integrated searching of data stored in a variety of databases and documents, meaning that users no longer have to look in several places for related information. NETMARK allows users to search and query information across all of these sources in one step. This cross-cutting capability in information analysis has exponentially reduced the amount of time needed to mine data from days or weeks to mere seconds. NETMARK has been used widely throughout NASA, enabling this automatic integration of information across many documents and databases. NASA projects that use NETMARK include the internal reporting system and project performance dashboard, Erasmus, NASA s enterprise management tool, which enhances organizational collaboration and information sharing through document routing and review; the Integrated Financial Management Program; International Space Station Knowledge Management; Mishap and Anomaly Information Reporting System; and management of the Mars Exploration Rovers. Approximately $1 billion worth of NASA s projects are currently managed using Program Management Tool (PMT), which is based on NETMARK. PMT is a comprehensive, Web-enabled application tool used to assist program and project managers within NASA enterprises in monitoring, disseminating, and tracking the progress of program and project milestones and other relevant resources. The PMT consists of an integrated knowledge repository built upon advanced enterprise-wide database integration techniques and the latest Web-enabled technologies. The current system is in a pilot operational mode allowing users to automatically manage, track, define, update, and view customizable milestone objectives and goals. The third software invention, Query

  12. Learning Curve: How College Graduates Solve Information Problems Once They Join the Workplace. Project Information Literacy Research Report

    ERIC Educational Resources Information Center

    Head, Allison J.

    2012-01-01

    Qualitative findings about the information-seeking behavior of today's college graduates as they transition from the campus to the workplace. Included are findings from interviews with 23 US employers and focus groups with 33 recent graduates from four US colleges and universities, conducted as an exploratory study for Project Information…

  13. Charting a Path to Graduation. The Effect of Project GRAD on Elementary School Student Outcomes in Four Urban School Districts

    ERIC Educational Resources Information Center

    Snipes, Jason C.; Holton, Glee Ivory; Doolittle, Fred

    2006-01-01

    In the past decade, school districts around the country have sought to improve struggling urban high schools, where high dropout rates, poor student achievement, and low rates of graduation and college-going remain all too prevalent. In a field crowded with reform initiatives, Project Graduation Really Achieves Dreams (GRAD) stands out as…

  14. The Project Manager Who Saved His Country

    NASA Technical Reports Server (NTRS)

    Baniszewski, John

    2008-01-01

    George Meade defeated Robert E. Lee, one of the greatest military leaders of all time. How did he do it? By using the skills he had learned as a project manager and outperforming Lee in all aspects of project management. Most project managers are familiar with the Project Management Institute's "Guide to the Project Management Body of Knowledge" (PMBOK), which identifies the skills and knowledge crucial to successful project management. Project managers need to make sure that all the elements of a project work together. They must develop and execute plans and coordinate changes to those plans. A project manager must define the scope of the work, break it into manageable pieces, verify and control what work is being done, and make sure that the work being done is essential to the project. Every project manager knows the challenges of schedule and the value of schedule slack. Project managers must get the resources they need and use them effectively. Project managers get the people they need and use their talents to achieve mission success. Projects generate huge amounts of information. A key to project success is getting sufficient and accurate information to the people who need it when they need it. Project managers must identify and quantify the risks that jeopardize project success and make plans for dealing with them. Studying Meade and Lee's performances at Gettysburg can help modern project managers appreciate, develop, and use the skills they need to be good project managers. The circumstances may be different, but the basic principles are the same. This dramatic event in American history shows how the skills of project management can be used in almost any situation. Former project manager George Meade used those skills to change the tide of the Civil War.

  15. Managing projects for high performance

    SciTech Connect

    Shepard, H.; Gonzalez, J.

    1984-02-01

    Interviews and observations by the authors in a number of large successful projects in the energy, chemicals and aerospace industries led to the formulation of a set of management principles which are presented here. They concern leadership style, organization structure and culture, spirit, team work, foresight and continuity.

  16. Etched Impressions: Student Writing as Engaged Pedagogy in the Graduate Sport Management Classroom

    ERIC Educational Resources Information Center

    Veri, Maria J.; Barton, Kenny; Burgee, David; Davis, James A., Jr.; Eaton, Pamela; Frazier, Cathy; Gray, Stevie; Halsey, Christine; Thurman, Richard

    2006-01-01

    This article illustrates the pedagogical value of employing student narrative writing assignments in the graduate sport management classroom and advocates for cultural studies and critical pedagogy approaches to teaching sport management. The article considers students' autobiographical narratives within a theoretical framework of cultural…

  17. The Project-Oriented Matrix and Instructional Development Project Management.

    ERIC Educational Resources Information Center

    Clymer, E. William

    1984-01-01

    Describes organizational factors that influence most instructional development projects, relates them to the features of the project-oriented matrix, and lists and explains specific matrix management strategies that instructional developers can use to solve common management problems. (MBR)

  18. Risk Management of NASA Projects

    NASA Technical Reports Server (NTRS)

    Sarper, Hueseyin

    1997-01-01

    Various NASA Langley Research Center and other center projects were attempted for analysis to obtain historical data comparing pre-phase A study and the final outcome for each project. This attempt, however, was abandoned once it became clear that very little documentation was available. Next, extensive literature search was conducted on the role of risk and reliability concepts in project management. Probabilistic risk assessment (PRA) techniques are being used with increasing regularity both in and outside of NASA. The value and the usage of PRA techniques were reviewed for large projects. It was found that both civilian and military branches of the space industry have traditionally refrained from using PRA, which was developed and expanded by nuclear industry. Although much has changed with the end of the cold war and the Challenger disaster, it was found that ingrained anti-PRA culture is hard to stop. Examples of skepticism against the use of risk management and assessment techniques were found both in the literature and in conversations with some technical staff. Program and project managers need to be convinced that the applicability and use of risk management and risk assessment techniques is much broader than just in the traditional safety-related areas of application. The time has come to begin to uniformly apply these techniques. The whole idea of risk-based system can maximize the 'return on investment' that the public demands. Also, it would be very useful if all project documents of NASA Langley Research Center, pre-phase A through final report, are carefully stored in a central repository preferably in electronic format.

  19. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a condition of the guarantee, the lender is to obtain borrower certification that the project is in...

  20. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Project management. 206.438... Project management. (a) General. The State serving as grantee has primary responsibility for project... actual project costs are exceeding the approved estimates. Cost overruns which can be met...

  1. Computer Aided Management for Information Processing Projects.

    ERIC Educational Resources Information Center

    Akman, Ibrahim; Kocamustafaogullari, Kemal

    1995-01-01

    Outlines the nature of information processing projects and discusses some project management programming packages. Describes an in-house interface program developed to utilize a selected project management package (TIMELINE) by using Oracle Data Base Management System tools and Pascal programming language for the management of information system…

  2. Assessing graduate programs for healthcare information management/technology (HIM/T) executives.

    PubMed

    Moore, Rick A; Berner, Eta S

    2004-03-18

    This paper describes a methodology to assess health/medical informatics graduate-level education curricula. The authors used the Certified Professional in Healthcare Information Management Systems (CPHIMS) exam objectives published by the Healthcare Information and Management Systems Society (HIMSS) as the basis for their assessment. The authors compared the 69 CPHIMS exam objectives against four health/medical informatics program course objectives as stated in the selected program's online graduate catalog. Results showed that the two programs with management as a focus addressed the majority (67 and 59%) of the CPHIMS objectives within core and elective courses combined. Overall, the other two programs addressed closer to a third of the CPHIMS objectives (36 and 32%). This methodology could prove to be useful in assisting students interested in graduate-level training programs with a tool by which to measure the congruence of the curricula of different programs with the mission of the programs and with their own professional interests.

  3. Progressive compression versus graduated compression for the management of venous insufficiency.

    PubMed

    Shepherd, Jan

    2016-09-01

    Venous leg ulceration (VLU) is a chronic condition associated with chronic venous insufficiency (CVI), where the most frequent complication is recurrence of ulceration after healing. Traditionally, graduated compression therapy has been shown to increase healing rates and also to reduce recurrence of VLU. Graduated compression occurs because the circumference of the limb is narrower at the ankle, thereby producing a higher pressure than at the calf, which is wider, creating a lower pressure. This phenomenon is explained by the principle known as Laplace's Law. Recently, the view that compression therapy must provide a graduated pressure gradient has been challenged. However, few studies so far have focused on the potential benefits of progressive compression where the pressure profile is inverted. This article will examine the contemporary concept that progressive compression may be as effective as traditional graduated compression therapy for the management of CVI.

  4. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for...

  5. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for...

  6. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for...

  7. 44 CFR 206.438 - Project management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Project management. 206.438 Section 206.438 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF... Project management. (a) General. The State serving as grantee has primary responsibility for...

  8. A community of educators: professional development for graduate students within the Berkeley Compass Project

    NASA Astrophysics Data System (ADS)

    Schwab, Josiah; Roth, Nathaniel; Berkeley Compass Project

    2015-01-01

    The Berkeley Compass Project is a self-formed group of graduate and undergraduate students in the physical sciences at UC Berkeley. Our goals are to improve undergraduate physics education, provide opportunities for professional development, and increase retention of students from populations typically underrepresented in the physical sciences. Graduate students, together with upper-level undergraduates, design and run all Compass programs. We strive to create a community of educators that incorporates best practices from the science education literature. Along the way, we develop experience in curriculum development, fundraising, grant writing, interfacing with university administration, and other aspects of running an effective organization. Our experience in Compass leaves us better poised to be successful researchers, teachers, and mentors.

  9. Managing MDO Software Development Projects

    NASA Technical Reports Server (NTRS)

    Townsend, J. C.; Salas, A. O.

    2002-01-01

    Over the past decade, the NASA Langley Research Center developed a series of 'grand challenge' applications demonstrating the use of parallel and distributed computation and multidisciplinary design optimization. All but the last of these applications were focused on the high-speed civil transport vehicle; the final application focused on reusable launch vehicles. Teams of discipline experts developed these multidisciplinary applications by integrating legacy engineering analysis codes. As teams became larger and the application development became more complex with increasing levels of fidelity and numbers of disciplines, the need for applying software engineering practices became evident. This paper briefly introduces the application projects and then describes the approaches taken in project management and software engineering for each project; lessons learned are highlighted.

  10. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.

    1992-03-01

    This Project Management Plan (PMP) describes the approach that will be used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems that will be used to plan and control the HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease Control (CDC), and the Technical Steering Panel (TSP).

  11. On Services for Collaborative Project Management

    NASA Astrophysics Data System (ADS)

    Ollus, Martin; Jansson, Kim; Karvonen, Iris; Uoti, Mikko; Riikonen, Heli

    This paper presents an approach for collaborative project management. The focus is on the support of collaboration, communication and trust. Several project management tools exist for monitoring and control the performance of project tasks. However, support of important intangible assets is more difficult to find. In the paper a leadership approach is identified as a management means and the use of new IT technology, especially social media for support of leadership in project management is discussed.

  12. Update on Service Management project

    ScienceCinema

    None

    2016-07-12

    GS and IT Service Management project status meeting -------------------------------------------------------------------------- Distribution: Sigurd Lettow, Frederic Hemmer, Thomas Pettersson, David Foster, Matti Tiirakari, GS&IT; Service Providers When and where: Thursday 2nd September at 10:00-11:30 in IFiltration Plant (222-R-001) Dear All, We would like to inform you about progress made on different topics like the Service Catalogue, the new Service Management Tool and the Service Desk. We would also like to present the plan for when we hope to "go live" and what this will mean for all of you running and providing services today. We will need your active support and help in the coming months to make this happen. GS&IT; Service Management Teams Reinoud Martens, Mats Moller

  13. Update on Service Management project

    SciTech Connect

    2011-02-28

    GS and IT Service Management project status meeting -------------------------------------------------------------------------- Distribution: Sigurd Lettow, Frederic Hemmer, Thomas Pettersson, David Foster, Matti Tiirakari, GS&IT; Service Providers When and where: Thursday 2nd September at 10:00-11:30 in IFiltration Plant (222-R-001) Dear All, We would like to inform you about progress made on different topics like the Service Catalogue, the new Service Management Tool and the Service Desk. We would also like to present the plan for when we hope to "go live" and what this will mean for all of you running and providing services today. We will need your active support and help in the coming months to make this happen. GS&IT; Service Management Teams Reinoud Martens, Mats Moller

  14. Can MHA graduates tackle financial management? Lessons from American corporate industry.

    PubMed

    Hepner, J O; Ameiss, A P

    1984-01-01

    American industry, the major purchaser of medical services, is beginning to use its buying power to intervene in the healthcare system. Management committees hav been established to develop cost analysis and containment approaches to the utilization of medical services. With innovations by corporate industry, does the hospital CEO see an advocate or yet another adversary in addition to government regulation? Specifically, what preparation do master's degree graduates have, prior to their subsequent job experience, to make an informed contribution in financial decision making? Research was conducted to obtain data from health administration graduate programs in the United States and Canada to help find answers to these questions. This study addresses the strengths and weaknesses of the two major inputs to health financial management education--the proper mix and delivery of course presentations, and the student's motivation, maturity, and academic background. In some respects, both have been found wanting--not only from the findings of this investigation, but also by the AUPHA Task Force on Financial Management in the curriculum. About one-fourth of the entrants to master's degree programs have a business school background which includes courses in accounting, economics, and finance. However, the remaining 75% have other academic backgrounds, which suggests that teaching financially oriented courses to these graduate students is a major problem. The question of whether a health administration graduate with some finance training or a pure finance graduate is more desirable remains unanswered. This is especially true in meshing the immediate needs of the healthcare marketplace for financial management personnel and the long-range career goals of the graduate. This article presents the survey results and seven recommendations for action.

  15. Breakthrough Propulsion Physics Project: Project Management Methods

    NASA Technical Reports Server (NTRS)

    Millis, Marc G.

    2004-01-01

    To leap past the limitations of existing propulsion, the NASA Breakthrough Propulsion Physics (BPP) Project seeks further advancements in physics from which new propulsion methods can eventually be derived. Three visionary breakthroughs are sought: (1) propulsion that requires no propellant, (2) propulsion that circumvents existing speed limits, and (3) breakthrough methods of energy production to power such devices. Because these propulsion goals are presumably far from fruition, a special emphasis is to identify credible research that will make measurable progress toward these goals in the near-term. The management techniques to address this challenge are presented, with a special emphasis on the process used to review, prioritize, and select research tasks. This selection process includes these key features: (a) research tasks are constrained to only address the immediate unknowns, curious effects or critical issues, (b) reliability of assertions is more important than the implications of the assertions, which includes the practice where the reviewers judge credibility rather than feasibility, and (c) total scores are obtained by multiplying the criteria scores rather than by adding. Lessons learned and revisions planned are discussed.

  16. Finance and supply management project execution plan

    SciTech Connect

    BENNION, S.I.

    1999-02-10

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  17. Practical Project Management for Education and Training.

    ERIC Educational Resources Information Center

    Lockitt, Bill

    This booklet provides a succinct guide to effective management procedures, including whether and how to take on projects, estimation of costs prior to project bids, project management tools, case studies, and practical exercises for staff development activities. Chapter 1 investigates why institutions take on projects, issues involved, benefits…

  18. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor)

    1994-01-01

    This volume is the eighth in an ongoing series addressing current topics and lessons learned in NASA program and project management. Articles in this volume cover the following topics: (1) power sources for the Galileo and Ulysses Missions; (2) managing requirements; (3) program control of the Tropical Rainfall Measuring Mission; (4) project management method; (5) career development for project managers; and (6) resources for NASA managers.

  19. The Validity of the Graduate Management Admissions Test for Non-U.S. Students

    ERIC Educational Resources Information Center

    Koys, Daniel J.

    2005-01-01

    In this study, the author examined the validity of the Graduate Management Admissions Test (GMAT) for non-U.S. students (N = 75) through a predictive validation procedure in which applicants were given the predictor test but the test results were not used to admit students. The author's business school admitted students to three overseas MBA…

  20. Competency of Graduate Nurses as Perceived by Nurse Preceptors and Nurse Managers

    ERIC Educational Resources Information Center

    Wise, Vanessa

    2013-01-01

    As newly graduated associate degree nurses (ADN) and baccalaureate degree nurses (BSN) enter into the workforce, they must be equipped to care for a complex patient population; therefore, the purpose of this study was to address the practice expectations and clinical competency of new nurses as perceived by nurse preceptors and nurse managers.…

  1. Managing the Openness-Closedness Dialectic: How Graduate Teaching Assistants Handle the Tension

    ERIC Educational Resources Information Center

    Webb, Nathan G.

    2012-01-01

    Graduate teaching assistants (GTAs) are a pervasive part of undergraduate education. When interacting with undergraduate students, GTAs must balance a tension of being a friend and an authority figure with students. One of the ways that balance is managed is through GTA self-disclosure. Self-disclosure is defined as, "the act of revealing…

  2. Recommended Skill Requirements of Recent Management Information Systems Graduates for Employment: A Modified Delphi Study

    ERIC Educational Resources Information Center

    Strnad, Michael A., Sr.

    2013-01-01

    The purpose of this Modified Delphi study was to achieve a consensus and forecast a prediction from expert IT hiring managers on what skills are required of MIS graduates for employment. In doing so, guidance could be provided to academic leaders who design curricula for MIS students on the required skills for employment. This study was conducted…

  3. Recent Trends in Characteristics of Graduate Management Admission Test Takers. GMAC Occasional Papers.

    ERIC Educational Resources Information Center

    Hudis, Paula M.; Stolzenberg, Ross M.

    Statistical trends in the characteristics of registrants for the Graduate Management Admission Test (GMAT) are presented. Areas of focus are: registrations (registration volumes have increased dramatically over time); worldwide age distribution (the percentage of older test registrants has increased); world distribution (there has been a…

  4. A Pilot Test of a Graduate Course in Suicide Theory, Risk Assessment, and Management

    ERIC Educational Resources Information Center

    Cramer, Robert J.; Bryson, Claire N.; Stroud, Caroline H.; Ridge, Brittany E.

    2016-01-01

    The present discussion outlines the design and initial implementation of a semester-long graduate course in suicide theory, risk assessment, and management. While the structure of the course is adaptable in light of various considerations (e.g., targeted group of students and availability of resources), we review suicide risk assessment core…

  5. Women and Graduate Management Education (2012). GMAC[R] Data-to-Go Series

    ERIC Educational Resources Information Center

    Graduate Management Admission Council, 2012

    2012-01-01

    This paper provides statistics on women and graduate management education for 2012. This paper contains two parts: (1) Women in the Business School Talent Pipeline; and (2) Women in Business. "Women in the Business School Talent Pipeline" discusses: (1) GMAT[R] Examinees; (2) B-School Demand from Younger Women; (3) MBA, Masters &…

  6. Teaching Business Process Management with Simulation in Graduate Business Programs: An Integrative Approach

    ERIC Educational Resources Information Center

    Saraswat, Satya Prakash; Anderson, Dennis M.; Chircu, Alina M.

    2014-01-01

    This paper describes the development and evaluation of a graduate level Business Process Management (BPM) course with process modeling and simulation as its integral component, being offered at an accredited business university in the Northeastern U.S. Our approach is similar to that found in other Information Systems (IS) education papers, and…

  7. Effective Management and Operation of Graduate Programs in Colleges of Pharmacy

    ERIC Educational Resources Information Center

    Farnsworth, Norman R.

    1977-01-01

    Management strategy and policy adapted at the University of Illinois at the Medical Center are described in terms of: faculty teaching vs. research time; faculty effectiveness and productivity; committee meetings; morale; departmental funds for research; expectations from graduate students; student recruitment; and program implementation. (LBH)

  8. Prerequisite Coursework as a Predictor of Performance in a Graduate Management Course

    ERIC Educational Resources Information Center

    McMillan-Capehart, Amy; Adeyemi-Bello, Tope

    2008-01-01

    There have been many studies published concerning predictors of academic performance but few of these studies have examined the impact of prerequisites. As such, we investigated the impact of a prerequisite management course on graduate student performance in an Organizational Behavior (OB) course. In this longitudinal study, we explored…

  9. Female Project Managers' Workplace Problems: a Survey

    NASA Astrophysics Data System (ADS)

    Duong, Thuong Thi; Skitmore, Martin

    This article examines the extent to which challenges in the workplace may cause female project managers to be in a significantly small minority. A survey of members of the Australian Institute of Project Management in Queensland is described. This compares the experiences and observations of both men and women on various issues related to technical and gender aspects in project management workplaces. The results show that although female project managers experience many problems, male project managers also experience most of the same problems. Likewise, there are also few differences between more and less experience, the level of management, and types of industries. The differences that do occur involve discrimination against women in general, differences in project management styles, and support from other project managers.

  10. Graduated punishment is efficient in resource management if people are heterogeneous.

    PubMed

    Iwasa, Yoh; Lee, Joung-Hun

    2013-09-21

    In natural resource managements, people often overcome tragedy of commons by developing an institution that punishes selfish actions, thus enhancing pro-social behavior. Elinor Ostrom reported that many successful communities apply graduated punishment--the punishment level gradually increases with the amount of harm of the selfish action. This observation is apparently in conflict with a theoretical study of public good game supporting a severe and strict punishment. Here, we study the conditions in which graduated punishment enforces cooperation most efficiently. If people follow a quantal response equilibrium, the optimal punishment is a jump from no punishment to a high level of punishment then increases little with the societal harm, which is inconsistent with the graduated punishment concept. We find that the graduated punishment is the most efficient rule if there is a small probability that player's action is reported incorrectly and if players are heterogeneous in their sensitivity to utility (or payoff) difference. We derive a mathematical formula for the optimal punishment when people's sensitivity to utility difference follows an exponential distribution. When the magnitude of harm is large, the optimal punishment increases in proportion to the square root of the societal harm, thus confirming the efficiency of the graduated punishment.

  11. Project management practices in engineering university

    NASA Astrophysics Data System (ADS)

    Sirazitdinova, Y.; Dulzon, A.; Mueller, B.

    2015-10-01

    The article presents the analysis of usage of project management methodology in Tomsk Polytechnic University, in particular the experience with the course Project management which started 15 years ago. The article presents the discussion around advantages of project management methodology for engineering education and administration of the university in general and the problems impeding extensive implementation of this methodology in teaching, research and management in the university.

  12. Project Graduation: A Celebration for Life. Tips on Starting a Tradition of Graduation Celebrations without Alcohol, Drugs, and Accidents!

    ERIC Educational Resources Information Center

    Wright, David A.

    Based on a program which was developed in Maine, this guide provides specific suggestions for establishing a new "tradition" of substance-free celebration at graduation and prom parties for high school students. An introduction discusses the dangers of drinking at high school parties, the benefits of alcohol and drug-free parties, and…

  13. Learning from Follow Up Surveys of Graduates: The Austin Teacher Program and the Benchmark Project. A Discussion Paper.

    ERIC Educational Resources Information Center

    Baker, Thomas E.

    This paper describes Austin College's (Texas) participation in the Benchmark Project, a collaborative followup study of teacher education graduates and their principals, focusing on the second round of data collection. The Benchmark Project was a collaboration of 11 teacher preparation programs that gathered and analyzed data comparing graduates…

  14. Knocking at the College Door: Projections of High School Graduates by State and Race/Ethnicity, 1992-2022. Nevada

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2008

    2008-01-01

    The 7th edition of this publication provides updated projections of high school graduates for each year and each state (plus the District of Columbia) through 2022. The profile breaks down the projections by major racial and ethnic groups: (1) American Indian/Alaska Native; (2) Asian/Pacific Islander; (3) Black, non-Hispanic; (4) Hispanic; and (5)…

  15. Database Design for Preservation Project Management: The California Newspaper Project.

    ERIC Educational Resources Information Center

    Hayman, Lynne M.

    1997-01-01

    Describes a database designed to manage a serials preservation project in which issues from multiple repositories are gathered and collated for preservation microfilming. Management information, added to bibliographic and holdings records, supports the production of reports tracking preservation activity. (Author)

  16. The Environmental Management Project Manager`s Handbook for improved project definition

    SciTech Connect

    1995-02-01

    The United States Department of Energy (DOE) is committed to providing high quality products that satisfy customer needs and are the associated with this goal, DOE personnel must possess the knowledge, skills, and abilities to ensure successful job performance. In addition, there must be recognition that the greatest obstacle to proper project performance is inadequate project definition. Without strong project definition, DOE environmental management efforts are vulnerable to fragmented solutions, duplication of effort, and wastes resources. The primary means of ensuring environmental management projects meet cost and schedule milestones is through a structured and graded approach to project definition, which is the focus of this handbook.

  17. The Professional Careers of Graduates of a Management Faculty

    ERIC Educational Resources Information Center

    Efendiev, Azer Gamidovich; Balabanova, Evgeniia Sergeevna

    2010-01-01

    The high demand for educational services for training in specialties of economic management, a level that has become increasingly apparent in the past decade and a half, has taken shape as a result of the population's perceptions as to which specialties are the most in demand in Russia's labor market. And yet, as experts in the field of education…

  18. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to...

  19. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to...

  20. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to...

  1. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to...

  2. 43 CFR 418.29 - Project management.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Project management. 418.29 Section 418.29... INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.29 Project management. In addition to the provisions of § 418.28, if the District is found to...

  3. Basic Project Management Methodologies for Survey Researchers.

    ERIC Educational Resources Information Center

    Beach, Robert H.

    To be effective, project management requires a heavy dependence on the document, list, and computational capability of a computerized environment. Now that microcomputers are readily available, only the rediscovery of classic project management methodology is required for improved resource allocation in small research projects. This paper provides…

  4. An educational intervention to promote self-management and professional socialization in graduate nurse anesthesia students

    NASA Astrophysics Data System (ADS)

    Maloy, Debra A.

    Traditionally, nurse anesthesia educators have utilized prior academic achievement to predict student success. However, research has indicated that prior academic achievement offers an inadequate assessment of student success in graduate healthcare programs with extensive clinical residencies. The educational literature has identified many non-cognitive factors, such as self-efficacy and locus of control, that may provide a more holistic prediction model of student success. An experimental study with pretest-posttest design and stratified random assignment was conducted to evaluate the effectiveness of an educational intervention to promote self-management, professional socialization, and academic achievement among first semester graduate nurse anesthesia students. Participants (N = 66) were demographically similar to the national graduate nurse anesthesia student body, though Hispanics and younger students were a little over-represented in the sample (56% female, 75.8% White, 15.2% Hispanic, 6% Other, 59% ≤ 30-years-old, 67% ≤ 3 years of ICU). The results showed that most graduate anesthesia students had strong self-management and professional socialization characteristics on admission. The results did not support the effectiveness of this educational intervention. Thus, ceiling effect may have accounted in part for statistically non-significant results regarding self-efficacy (p = .190, o2 = .03), locus of control (p = .137, o2 = .04), professional socialization (p = .819, o2 = .001), and academic achievement (p = .689, o2 = .003). Future researchers may need to expand the scope of the intervention, use a more powerful and sensitive instrument, and utilize a larger sample.

  5. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1991-01-01

    This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

  6. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1990-01-01

    This volume is the third in an ongoing series on aerospace project management at NASA. Articles in this volume cover the attitude of the program manager, program control and performance measurement, risk management, cost plus award fee contracting, lessons learned from the development of the Far Infrared Absolute Spectrometer (FIRAS), small projects management, and age distribution of NASA scientists and engineers. A section on resources for NASA managers rounds out the publication.

  7. Status of Project Management Education in Pakistan

    ERIC Educational Resources Information Center

    Arain, Faisal Manzoor; Tipu, Syed Awais Ahmad

    2009-01-01

    Emerging contractual delivery systems, collaborative partnerships, new management initiatives, and global product markets require professionals and students to have a broader awareness of construction methods and project management issues. This paper presents the state of the project management education in Pakistan. The analysis is based on…

  8. Advancing Project Management in Learning Organizations

    ERIC Educational Resources Information Center

    Bourne, Lynda; Walker, Derek H. T.

    2004-01-01

    Effective project managers are required to have both "hard" technical skills to help control the iron triangle of time, cost and functional scope as well as relationship management skills to work effectively with people and get the best out of them. This paper argues that project managers also need a third skill: we refer to it as tapping into the…

  9. Employment Success and Satisfaction among Graduates of Tennessee Technological University's Master of Science Program in Fisheries Management

    ERIC Educational Resources Information Center

    Kranz, Peter L.; Steele, Richard A.; Lund, Nick L.; Cook, S. Bradford

    2004-01-01

    Graduates of the Tennessee Technological University graduate fisheries management program were surveyed and asked five open-ended questions related to their satisfaction with the program, particularly as it has impacted them in their later professional success. Respondents were also asked to suggest improvements in the program. They reported…

  10. A Study of the Factors and Conditions Associated with Graduate Enrollment Management Practitioners' Participation in Professional Development

    ERIC Educational Resources Information Center

    Balayan, Ariana

    2016-01-01

    This investigation was designed to determine the factors and conditions associated with graduate enrollment management practitioners' participation in professional development (PD) activities. The sample consisted of members of a professional association, the National Association of Graduate Admissions Professionals (NAGAP), focused solely on…

  11. Effectiveness of a Conflict Resolution Training Program in Changing Graduate Students Style of Managing Conflict with Their Faculty Advisors

    ERIC Educational Resources Information Center

    Brockman, Julie L.; Nunez, Antonio A.; Basu, Archana

    2010-01-01

    We investigated the conflict management preferences of graduate students with their faculty advisors and assessed the effects of participating in a conflict resolution workshop on those preferences. One hundred and twenty-one graduate students completed the pre-workshop surveys, and 69 participants completed the post-workshop surveys after seven…

  12. Project Management in Real Time: A Service-Learning Project

    ERIC Educational Resources Information Center

    Larson, Erik; Drexler, John A., Jr.

    2010-01-01

    This article describes a service-learning assignment for a project management course. It is designed to facilitate hands-on student learning of both the technical and the interpersonal aspects of project management, and it involves student engagement with real customers and real stakeholders in the creation of real events with real outcomes. As…

  13. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.; McMakin, A.H.; Finch, S.M.

    1992-09-01

    This Project Management Plan (PMP) describes the approach being used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems used to plan and control HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease control (CDC), and the Technical Steering Panel (TSP). Battelle`s contract with CDC only extends through May 1994 when the key technical work will be completed. There-fore, this plan is focused only on the period during which Battelle is a participant.

  14. Project Management Plan for the Hanford Environmental Dose Reconstruction Project

    SciTech Connect

    Shipler, D.B.; McMakin, A.H.; Finch, S.M.

    1992-09-01

    This Project Management Plan (PMP) describes the approach being used to manage the Hanford Environmental Dose Reconstruction (HEDR) Project. The plan describes the management structure and the technical and administrative control systems used to plan and control HEDR Project performance. The plan also describes the relationship among key project participants: Battelle, the Centers for Disease control (CDC), and the Technical Steering Panel (TSP). Battelle's contract with CDC only extends through May 1994 when the key technical work will be completed. There-fore, this plan is focused only on the period during which Battelle is a participant.

  15. Introducing Risk Management Techniques Within Project Based Software Engineering Courses

    NASA Astrophysics Data System (ADS)

    Port, Daniel; Boehm, Barry

    2002-03-01

    In 1996, USC switched its core two-semester software engineering course from a hypothetical-project, homework-and-exam course based on the Bloom taxonomy of educational objectives (knowledge, comprehension, application, analysis, synthesis, and evaluation). The revised course is a real-client team-project course based on the CRESST model of learning objectives (content understanding, problem solving, collaboration, communication, and self-regulation). We used the CRESST cognitive demands analysis to determine the necessary student skills required for software risk management and the other major project activities, and have been refining the approach over the last 5 years of experience, including revised versions for one-semester undergraduate and graduate project course at Columbia. This paper summarizes our experiences in evolving the risk management aspects of the project course. These have helped us mature more general techniques such as risk-driven specifications, domain-specific simplifier and complicator lists, and the schedule as an independent variable (SAIV) process model. The largely positive results in terms of review of pass / fail rates, client evaluations, product adoption rates, and hiring manager feedback are summarized as well.

  16. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1992-01-01

    This volume is the fifth in an ongoing series on aerospace project management at NASA. Articles in this volume cover: an overview of the project cycle; SE&I management for manned space flight programs; shared experiences from NASA Programs and Projects - 1975; cost control for Mariner Venus/Mercury 1973; and the Space Shuttle - a balancing of design and politics. A section on resources for NASA managers rounds out the publication.

  17. Amine Swingbed Payload Project Management

    NASA Technical Reports Server (NTRS)

    Hayley, Elizabeth; Curley, Su; Walsh, Mary

    2011-01-01

    The International Space Station (ISS) has been designed as a laboratory for demonstrating technologies in a microgravity environment, benefitting exploration programs by reducing the overall risk of implementing such technologies in new spacecraft. At the beginning of fiscal year 2010, the ISS program manager requested that the amine-based, pressure-swing carbon dioxide and humidity absorption technology (designed by Hamilton Sundstrand, baselined for the ORION Multi-Purpose Crew Vehicle, and tested at the Johnson Space Center in relevant environments, including with humans, since 2005) be developed into a payload for ISS Utilization. In addition to evaluating the amine technology in a flight environment before the first launch of the ORION vehicle, the ISS program wanted to determine the capability of the amine technology to remove carbon dioxide from the ISS cabin environment at the metabolic rate of the full 6-person crew. Because the amine technology vents the absorbed carbon dioxide and water vapor to space vacuum (open loop), additional hardware needed to be developed to minimize the amount of air and water resources lost overboard. Additionally, the payload system would be launched on two separate Space Shuttle flights, with the heart of the payload the swingbed unit itself launching a full year before the remainder of the payload. This paper discusses the project management and challenges of developing the amine swingbed payload in order to accomplish the technology objectives of both the open-loop ORION application as well as the closed-loop ISS application.

  18. Amine Swingbed Payload Project Management

    NASA Technical Reports Server (NTRS)

    Walsch, Mary; Curley, Su

    2013-01-01

    The International Space Station (ISS) has been designed as a laboratory for demonstrating technologies in a microgravity environment, benefitting exploration programs by reducing the overall risk of implementing such technologies in new spacecraft. At the beginning of fiscal year 2010, the ISS program manager requested that the amine-based, pressure-swing carbon dioxide and humidity absorption technology (designed by Hamilton Sundstrand, baselined for the Orion Multi-Purpose Crew Vehicle, and tested at the Johnson Space Center in relevant environments, including with humans, since 2005) be developed into a payload for ISS Utilization. In addition to evaluating the amine technology in a flight environment before the first launch of the Orion vehicle, the ISS program wanted to determine the capability of the amine technology to remove carbon dioxide from the ISS cabin environment at the metabolic rate of the full 6 ]person crew. Because the amine technology vents the absorbed carbon dioxide and water vapor to space vacuum (open loop), additional hardware needed to be developed to minimize the amount of air and water resources lost overboard. Additionally, the payload system would be launched on two separate Space Shuttle flights, with the heart of the payload-the swingbed unit itself-launching a full year before the remainder of the payload. This paper discusses the project management and challenges of developing the amine swingbed payload in order to accomplish the technology objectives of both the open -loop Orion application as well as the closed-loop ISS application.

  19. Toward an expert project management system

    NASA Technical Reports Server (NTRS)

    Silverman, Barry G.; Murray, Arthur; Diakite, Coty; Feggos, Kostas

    1987-01-01

    The purpose of the research effort is to prescribe a generic reusable shell that any project office can install and customize for the purposes of advising, guiding, and supporting project managers in that office. The prescribed shell is intended to provide both: a component that generates prescriptive guidance for project planning and monitoring activities, and an analogy (intuition) component that generates descriptive insights of previous experience of successful project managers. The latter component is especially significant in that it has the potential to: retrieve insights, not just data, and provide a vehicle for expert PMs to easily transcribe their current experiences in the course of each new project managed.

  20. Project Manager Performance and the Decision to Backsource the Project Management Office

    ERIC Educational Resources Information Center

    Lively, William R.

    2014-01-01

    This paper reviews a management decision of an Information Technology Outsource (ITO) provider to backshore the management oversight of its Project Management Office (PMO) after only one year of offshore operations. Governance is a term used in project management to refer to management oversight. The review is a quantitative analysis of existing…

  1. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1988-01-01

    This collection of papers and resources on aerospace management issues is inspired by a desire to benefit from the lessons learned from past projects and programs. Inherent in the NASA culture is a respect for divergent viewpoints and innovative ways of doing things. This publication presents a wide variety of views and opinions. Good management is enhanced when program and project managers examine the methods of veteran managers, considering the lessons they have learned and reflected on their own guiding principles.

  2. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    ERIC Educational Resources Information Center

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  3. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1989-01-01

    This new collection of papers on aerospace management issues contains a history of NASA program and project management, some lessons learned in the areas of management and budget from the Space Shuttle Program, an analysis of tools needed to keep large multilayer programs organized and on track, and an update of resources for NASA managers. A wide variety of opinions and techniques are presented.

  4. "Hit the ground running": perspectives of new nurses and nurse managers on role transition and integration of new graduates.

    PubMed

    Chernomas, Wanda M; Care, W Dean; McKenzie, Jo-Ann Lapointe; Guse, Lorna; Currie, Jan

    2010-01-01

    The workplace for new graduates must be a constructive learning environment to facilitate their development. Nurse managers need new graduates who can "hit the ground running." Conflict between the needs of new nurses and the realities of the workplace often creates role confusion and tension in new graduates and threatens employers' ability to retain them. As part of a larger study that examined the effectiveness of a new strategy on new nurse retention and workplace integration, we conducted focus groups with new nurses and nurse managers. This paper discusses the perspectives of new nurses on their role transition from graduates to practising professionals and the perspectives of nurse managers on the workplace integration of new nurses. The thematic findings integrate new nurses' perspectives on their needs during role transition with the perspectives of nurse managers in meeting those needs. The discussion includes strategies to facilitate successful transition and integration of new nurses into the workplace within the context of recruitment and retention.

  5. Building Excellence in Project Execution: Integrated Project Management

    DTIC Science & Technology

    2015-04-30

    ååì~ä=^Åèìáëáíáçå= oÉëÉ~êÅÜ=póãéçëáìã= tÉÇåÉëÇ~ó=pÉëëáçåë= sçäìãÉ=f= = Building Excellence in Project Execution: Integrated Project Management Jamie...00-00-2015 to 00-00-2015 4. TITLE AND SUBTITLE Building Excellence in Project Execution: Integrated Project Management 5a. CONTRACT NUMBER...challenge by adopting and refining the CMMI Model and building the tenets of integrated project management (IPM) into project planning and execution

  6. A Theory of Software Project Management and PROMOL: A Project Management Modeling Language

    DTIC Science & Technology

    2008-03-01

    drivers that lead to functional and dysfunctional project behavior. We identify a set of criteria for assessing current and future modeling tools...project management theory that helps us to understand the conditions and drivers that lead to functional and dysfunctional project behavior. We identify...Turner explained the domain, the nature of project management, its governance and the functions of project management [27,28,29]. One year later

  7. The Graduate Outcome Project: Using Data from the Integrated Data Infrastructure Project

    ERIC Educational Resources Information Center

    Rees, Malcolm

    2014-01-01

    This paper reports on progress to date with a project underway in New Zealand involving the extraction of data from multiple government agencies that is then combined into one comprehensive longitudinal integrated dataset and made available to trial participants in a way never previously thought possible. The dataset includes school leaver…

  8. Adapting Project Management Practices to Research-Based Projects

    NASA Technical Reports Server (NTRS)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  9. Department of Energy Project Management System

    SciTech Connect

    Not Available

    1981-01-08

    This manual provides guidance to all appropriate personnel for implementation of DOE Project Management Policy. It sets forth the principles and requirements that govern the development, approval, and execution of DOE's outlay programs as embodied within the Project Management System (PMS). Its primary goal is to assure application of sound management principles providing a disciplined, systematic, and coordinated approach resulting in efficient planning, organization, coordination, budgeting, management, review, and control of DOE projects. The provisions of this manual are mandatory for the Department's Major Systems Acquisitions (MSA's) and Major Projects and will be used for other projects to the extent practicable. Department's project-management task is over 250 projects, with a total estimated cost in excess of $24 billion at completion. This diverse array of project activities requires a broad spectrum of scientific, engineering, and management skills to assure that they meet planned technical and other objectives and are accomplished on schedule, within cost and scope, and that they serve the purposes intended. In recognition of these requirements and the Department's ever-increasing magnitude of responsibilities, an interim Project Management System was established and has been in use for over a year. This manual constitutes an update of the system based on the experience gained and lessons learned during this initial period.

  10. The Impact of Project Management Maturity upon IT/IS Project Management Outcomes

    ERIC Educational Resources Information Center

    Carcillo, Anthony Joseph, Jr.

    2013-01-01

    Although it is assumed that increasing the institutionalization (or maturity) of project management in an organization leads to greater project success, the literature has diverse views. The purpose of this mixed methods study was to examine the correlation between project management maturity and IT/IS project outcomes. The sample consisted of two…

  11. 78 FR 16460 - Capital Project Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... Federal Transit Administration 49 CFR Part 633 RIN 2132-AA92 Capital Project Management AGENCY: Federal... revise the agency's project management oversight regulations, in light of the recent, fundamental changes... Improvement and State of Good Repair programs, and the streamlining of the New Starts and Small Starts...

  12. Spent Nuclear Fuel Project Configuration Management Plan

    SciTech Connect

    Reilly, M.A.

    1995-06-09

    This document is a rewrite of the draft ``C`` that was agreed to ``in principle`` by SNF Project level 2 managers on EDT 609835, dated March 1995 (not released). The implementation process philosphy was changed in keeping with the ongoing reengineering of the WHC Controlled Manuals to achieve configuration management within the SNF Project.

  13. Graduate Education in Nursing: Issues and Future Directions. Proceedings of a Conference Sponsored by the Nursing Curriculum Project (Atlanta, Georgia, December 2-3, 1980).

    ERIC Educational Resources Information Center

    Smith, Mary Howard, Ed.

    Proceedings of a conference on graduate education in nursing, which sought to provide a forum for discussion of issues and to share the findings and experiences of the graduate demonstration projects undertaken under the aegis of the Southern Regional Education Board's Nursing Curriculum Project, are presented. Contents include: "Purposes of…

  14. Community-Level Environmental Projects as Learning Tools for Planners: A Case Study of Graduate Planning Students

    ERIC Educational Resources Information Center

    Portman, Michelle E.; Teff-Seker, Yael

    2017-01-01

    Despite the potential environmental impact of urban planning, there is little research on Environmental Education (EE) in the context of urban planning curricula. This study follows graduate planning students' learning experience during group projects assigned as part of a planning course at the Technion--Israel Institute of Technology. These…

  15. PROJECT SEARCH: A Five Year Follow-up Study of High School Graduates. Three District Composite Report.

    ERIC Educational Resources Information Center

    Donaldson, Evelyn T., Comp.

    The document deals with a five year followup study of three California high school districts starting with 1963 graduates. The project was intended to discover if the guidance and curriculum activities offered enable students to make a satisfactory transition from high school into areas of work, school and/or homemaking. The following information…

  16. [An EPDA Project To Prepare Graduate Teachers and Undergraduate Indian Teacher Aides To Educate American Indian Children. A Proposal.

    ERIC Educational Resources Information Center

    Northern Montana Coll., Havre.

    A project is proposed involving a 3-year coordinated program of 9-week summer institutes and school-year inservice training programs to prepare 15 graduate teachers and 15 undergraduate Indian teacher aides to perform highly specialized roles in the education of Indian children. Teachers and aides will be placed in teaching teams of at least three…

  17. Personal computers as a project management tool

    SciTech Connect

    Levers, W.H.

    1985-01-01

    This paper deals with project management experience related to application of business level personal computers to two design and construction projects. Projects include brine support facilities for two 50 MW geothermal power plants in the Imperial Valley of California adjacent to the Mexican border. The installed value of the facilities involved is approximately $40 million.

  18. Putting the Q into Quality Project Management

    ERIC Educational Resources Information Center

    Lockitt, Bill

    2007-01-01

    Project management covers a wide range of skills and is one of the best forms of staff development available for the development of skills by doing. This publication is for the use of staff involved in e-learning development projects. An introduction and overview includes discussion of e-learning projects in general and why they are undertaken;…

  19. From Idea to Action: Promoting Responsible Management Education through a Semester-Long Academic Integrity Learning Project

    ERIC Educational Resources Information Center

    Lavine, Marc H.; Roussin, Christopher J.

    2012-01-01

    The authors describe a semester-long action-learning project where undergraduate or graduate management students learn about ethics, responsibility, and organizational behavior by examining the policy of their college or university that addresses academic integrity. Working in teams, students adopt a stakeholder management approach as they make…

  20. Agile Project Management for e-Learning Developments

    ERIC Educational Resources Information Center

    Doherty, Iain

    2010-01-01

    We outline the project management tactics that we developed in praxis in order to manage elearning projects and show how our tactics were enhanced through implementing project management techniques from a formal project management methodology. Two key factors have contributed to our project management success. The first is maintaining a clear…

  1. Project management: break through or bust.

    PubMed

    Zimmer, B T

    1999-08-01

    Making a wrong choice can severely affect even the best-managed implementation (and project manager's careers). There is simply no margin for error, so getting it right the first time is not merely an option--it is a prerequisite for success. This article will first review why projects fail, then highlight the project management process used by McInnes Steel to specify, choose, and implement MRP II software that was "right" for them. Insights and experiences will also be shared to assist others in their project management activities. Project ultimate measurement is the successful integration of new technology into the culture of the organization. The first and most crucial step in any implementation is the specification and subsequent selection of the equipment or technology. It is important to make the right choice--one where the technology provides value-added services to the users to help them do their jobs better, now and into the future.

  2. Tucson Solar Village: Project management

    SciTech Connect

    Not Available

    1991-11-01

    The Tucson Solar Village is a Design/Build Project In Sustainable Community Development which responds to a broad spectrum of energy, environmental, and economic challenges. This project is designed for 820 acres of undeveloped State Trust Land within the Tucson city limits; residential population will be five to six thousand persons with internal employment provided for 1200. This is a 15 year project (for complete buildout and sales) with an estimated cost of $500 million. Details of the project are addressed with emphasis on the process and comments on its transferability.

  3. Valuing the human asset - the impact of university placements on academic performance and graduate employment amongst management students

    NASA Astrophysics Data System (ADS)

    Brooks, R.

    2012-05-01

    The employment market for graduates is competitive with employers requiring appropriate work experience in addition to academic qualifications. Sandwich courses, where up to a year is spent in industry, provide an opportunity for structured work experience to be gained alongside studying. Benefits of placements include improved academic performance and the development of transferable skills to increase employability. This paper evaluates the impact of placements on academic performance and graduate employment among management students. Analysing performance data and graduate destinations data, results indicate that management students completing a placement are more likely to perform better academically with improvements in their personal grades between year 2 and the final year. Additionally, a qualitative themed analysis of student experiences indicates placement students feel more confident in engaging with the graduate recruitment process, with a better understanding of their personal skills and an ability to articulate their experience in relation to the workplace.

  4. The setting of research production by nursing and management graduate programs in Brazil.

    PubMed

    Munari, Denize Bouttelet; Chaves, Lucieli Dias Pedreschi; Peduzzi, Marina; Laus, Ana Maria; Fugulin, Fernanda Maria Togeiro; Ribeiro, Luana Cássia Miranda; Scochi, Carmen Gracinda Silvan

    2011-12-01

    This documental, descriptive study was performed using a quantitative approach with the objective to characterize the production by nursing graduates in Brazil in the 2007-2009 triennium, with emphasis on nursing management. Data was collected from the CAPES database, which allows access to the abstracts of theses and dissertations. The material was analyzed and categorized according to areas/fields and the respective lines of research, as defined in Nursing. The overall production analysis was descriptive and analytical in the field of organization, namely management. The results showed that, compared to previous studies, production underwent some changes in the triennium, with an increase in the area of health care, maintenance in the organizational area, and decrease in the professional area. Regarding the management theme, most studies addressed health assessment, the conceptions/perceptions regarding planning/organizing work-services and permanent education.

  5. Engineering data management: Experience and projections

    NASA Technical Reports Server (NTRS)

    Jefferson, D. K.; Thomson, B.

    1978-01-01

    Experiences in developing a large engineering data management system are described. Problems which were encountered are presented and projected to future systems. Business applications involving similar types of data bases are described. A data base management system architecture proposed by the business community is described and its applicability to engineering data management is discussed. It is concluded that the most difficult problems faced in engineering and business data management can best be solved by cooperative efforts.

  6. Cognitive competence of graduates, oriented to work in the knowledge management system in the state corporation “Rosatom”

    NASA Astrophysics Data System (ADS)

    Kireev, V.; Silenko, A.; Guseva, A.

    2017-01-01

    This article describes an approach to the determination of the level of formation of competences of university graduates, oriented to work in the state corporation “Rosatom” in a knowledge management system. With the use of cluster analysis graduate classes were identified, focused on knowledge transfer, analysis and the search for new knowledge, creative transformation of knowledge. In addition, the class innovators were identified, which were fully formed the necessary cognitive competences.

  7. When Serious Project Management is a Critical Business Requirement

    NASA Technical Reports Server (NTRS)

    Jansma, P. A.; Gibby, L.; Chambers, C.; Joines, J.; Egger, R.

    2000-01-01

    When serious project management is a critical business requirement, project managers need to integrate cost, schedule and technical scope of work across the project, and apply earned value management (EVM).

  8. Project management techniques for highly integrated programs

    NASA Technical Reports Server (NTRS)

    Stewart, J. F.; Bauer, C. A.

    1983-01-01

    The management and control of a representative, highly integrated high-technology project, in the X-29A aircraft flight test project is addressed. The X-29A research aircraft required the development and integration of eight distinct technologies in one aircraft. The project management system developed for the X-29A flight test program focuses on the dynamic interactions and the the intercommunication among components of the system. The insights gained from the new conceptual framework permitted subordination of departments to more functional units of decisionmaking, information processing, and communication networks. These processes were used to develop a project management system for the X-29A around the information flows that minimized the effects inherent in sampled-data systems and exploited the closed-loop multivariable nature of highly integrated projects.

  9. Risk management integration into complex project organizations

    NASA Technical Reports Server (NTRS)

    Fisher, K.; Greanias, G.; Rose, J.; Dumas, R.

    2002-01-01

    This paper describes the approach used in designing and adapting the SIRTF prototype, discusses some of the lessons learned in developing the SIRTF prototype, and explains the adaptability of the risk management database to varying levels project complexity.

  10. Project management oversight; Controversy or remedy

    SciTech Connect

    Lovejoy, N.B.; Mortensen, M.W. )

    1989-01-01

    In today's complex and litigious society with construction projects becoming ever more sophisticated, owners can no longer accept as a given that hiring a design engineer, construction manager, general contractor or an engineer procure construct (EPC) contractor ensures that their project will be well managed to complete on time and within budget. Mega capital projects today routinely encounter cost overruns and schedule delays. These circumstances create management problems, finger pointing, and lead to contractor claims which are becoming a major source of concern. This paper discusses one such avenue open to today's owners, to utilize the services of a project management oversight (PMO) consultant. PMO is a relatively new concept within the construction industry and as such is the subject of ongoing discussion and debate regarding its value.

  11. Competency model for the project managers of technical projects

    NASA Astrophysics Data System (ADS)

    Duncan, William R.

    1992-05-01

    Traditional job description techniques were developed to support compensation decisions for hourly wage earners in a manufacturing environment. Their resultant focus on activities performed on the job works well in this environment where the ability to perform the activity adequately is objectively verifiable by testing and observation. Although many organizations have adapted these techniques for salaried employees and service environments, the focus on activities performed has never been satisfactory. For example, stating that a project manager `prepares regular project status reports' tells us little about what to look for in a potential project manager or how to determine if a practicing project manager is ready for additional responsibilities. The concept of a `competency model' has been developed within the last decade to address this shortcoming. Competency models focus on what skills are needed to perform the tasks defined by the job description. For example, a project manager must be able to communicate well both orally and in writing in order to `prepare regular project status reports.'

  12. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    NASA Astrophysics Data System (ADS)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  13. Cultural differences in Research project management

    NASA Astrophysics Data System (ADS)

    Barbier, Michele

    2016-04-01

    Scientific Projects today have increased in complexity, requiring multidisciplinarity, and requiring a mix of diverse individuals from different countries who must be integrated into an effective project. Effective team building is one of the prime responsibilities of the project manager. When the project is supported by a funding, the integration and the implication of the different partners are quite easy. Particularly when partners are developing high-performing teams. However, management of research project requires further skills when the budget is not very high and/or when partners are from non-European countries and are not using the same vocabulary. The various cultures, values, beliefs and social usages, particularly with Mediterranean countries cause a special style of communication for an individual or group of individuals. This communication style participates in the success of the project and encompasses a lot of diplomatic skills which will be highlighted.

  14. Translational Science Project Team Managers: Qualitative Insights and Implications from Current and Previous Postdoctoral Experiences.

    PubMed

    Wooten, Kevin C; Dann, Sara M; Finnerty, Celeste C; Kotarba, Joseph A

    2014-07-01

    The development of leadership and project management skills is increasingly important to the evolution of translational science and team-based endeavors. Team science is dependent upon individuals at various stages in their careers, inclusive of postdocs. Data from case histories, as well as from interviews with current and former postdocs, and those supervising postdocs, indicate six essential tasks required of project managers in multidisciplinary translational teams, along with eight skill-related themes critical to their success. To optimize the opportunities available and to ensure sequential development of team project management skills, a life cycle model for the development of translational team skills is proposed, ranging from graduate trainees, postdocs, assistant professors, and finally to mature scientists. Specific goals, challenges and project management roles and tasks are recommended for each stage for the life cycle.

  15. Translational Science Project Team Managers: Qualitative Insights and Implications from Current and Previous Postdoctoral Experiences

    PubMed Central

    Wooten, Kevin C.; Dann, Sara M.; Finnerty, Celeste C.; Kotarba, Joseph A.

    2015-01-01

    The development of leadership and project management skills is increasingly important to the evolution of translational science and team-based endeavors. Team science is dependent upon individuals at various stages in their careers, inclusive of postdocs. Data from case histories, as well as from interviews with current and former postdocs, and those supervising postdocs, indicate six essential tasks required of project managers in multidisciplinary translational teams, along with eight skill-related themes critical to their success. To optimize the opportunities available and to ensure sequential development of team project management skills, a life cycle model for the development of translational team skills is proposed, ranging from graduate trainees, postdocs, assistant professors, and finally to mature scientists. Specific goals, challenges and project management roles and tasks are recommended for each stage for the life cycle. PMID:25621288

  16. Waste management project technical baseline description

    SciTech Connect

    Sederburg, J.P.

    1997-08-13

    A systems engineering approach has been taken to describe the technical baseline under which the Waste Management Project is currently operating. The document contains a mission analysis, function analysis, requirement analysis, interface definitions, alternative analysis, system definition, documentation requirements, implementation definitions, and discussion of uncertainties facing the Project.

  17. Evaluation of the School Administration Manager Project

    ERIC Educational Resources Information Center

    Turnbull, Brenda J.; Haslam, M. Bruce; Arcaira, Erikson R.; Riley, Derek L.; Sinclair, Beth; Coleman, Stephen

    2009-01-01

    The School Administration Manager (SAM) project, supported by The Wallace Foundation as part of its education initiative, focuses on changing the conditions in schools that prevent principals from devoting more time to instructional leadership. In schools participating in the National SAM Project, principals have made a commitment to increase the…

  18. Experiential learning in control systems laboratories and engineering project management

    NASA Astrophysics Data System (ADS)

    Reck, Rebecca Marie

    2015, a panel of 40 control systems faculty members, from a variety of institutions, completed a multi-round Delphi survey in order to bring them toward consensus on the common aspects of their laboratories. The following winter, 45 additional faculty members and practitioners from the control systems community completed a follow-up survey to gather feedback on the results of the Delphi survey. During the Delphi study, the panelists identified 15 laboratory objectives, 26 concepts, and 15 components that were common in their laboratories. Then in both the Delphi survey and follow-up survey each participant rated the importance of each of these items. While the average ratings differed slightly between the two groups, the order of each set of items was compared with two different tests and the order was found to be similar. Some of the common and important learning objectives include connecting theory to what is implemented and observed in the laboratory, designing controllers, and modeling and simulating systems. The most common component in both groups was Math-Works software. Some of the common concepts include block diagrams, stability, and PID control. Defining common aspects of undergraduate control systems laboratories enables common development, detailed comparisons, and simplified adaptation of equipment and experiments between campuses and programs. Throughout an undergraduate program in engineering, there are multiple opportunities for hands-on laboratory experiences that are related to course content. However, a similarly immersive experience for project management graduate students is harder to incorporate for all students in a course at once. This study explores an experiential learning opportunity for graduate students in engineering management or project management programs. The project management students enroll in a project management course. Undergraduate students interested in working on a project with a real customer enroll in a different projects

  19. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor); Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1995-01-01

    This volume is the ninth in an ongoing series on aerospace project management at NASA. Articles in this volume cover evolution of NASA cost estimating; SAM 2; National Space Science Program: strategies to maximize science return; and human needs, motivation, and results of the NASA culture surveys. A section on resources for NASA managers rounds out the publication.

  20. Issues in NASA program and project management

    NASA Technical Reports Server (NTRS)

    Hoban, Francis T. (Editor)

    1993-01-01

    This volume is the sixth in an ongoing series on aerospace project management at NASA. Articles in this volume cover evolution of NASA cost estimating; SAM 2; National Space Science Program: strategies to maximize science return; and human needs, motivation, and results of the NASA culture surveys. A section on resources for NASA managers rounds out the publication.

  1. Post-Secondary Pathways of Non-Graduates from B.C. Grade 12. Research Results from the Student Transitions Project

    ERIC Educational Resources Information Center

    Beatty-Guenter, Patricia; Cowin, Bob

    2013-01-01

    The Student Transitions Project (STP) has focused its research since 2005 on the achievements of British Columbia (B.C.) grade 12 graduates who enrolled in post-secondary education. Some students who do not graduate from Grade 12 also enroll at post-secondary institutions in a variety of programs, but little has been reported on these…

  2. Building Excellence in Project Execution Integrated Project Management

    DTIC Science & Technology

    2015-05-01

    to a penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. 1. REPORT DATE MAY...characteristics of unification , consolidation, communication and integrative actions that are crucial to controlled project execution through completion... itative R isk Analysis Project Management Processes Ada,pted from the Founh Edition of jde to the P~ect 1M a.nageme nt 8 ody of Knowledge Pn:>ject

  3. A Comparative Study of the Perceived Usefulness of Civilian Institution Contracting-Related Graduate Programs by Graduates and the Perceived Usefulness of the AFIT CAM (Air Force Institute of Technology Contracting and Manufacturing) Program by Graduates

    DTIC Science & Technology

    1985-09-01

    need more emphasis: Project Management, Quality Assurance, Materiels Management , Case Studies in Procurement, Requests for Proposal, Overview of... Case Studies in Procurement, and Incentive Contracting. There are numerous areas which the graduates felt could be de-emphasized (See Table 3.16...weak in Project Management, Systems Procurement, Quality Assurance, Production Operations, Contract Law, Procurement Management, Materiels Management

  4. Program/project management resource lists

    NASA Technical Reports Server (NTRS)

    1993-01-01

    The Program/Project Management Collection at NASA Headquarters Library is part of a larger initiative by the Training and Development Division, Code FT, NASA Headquarters. The collection is being developed to support the Program/Project Management Initiative which includes the training of NASA managers. These PPM Resource Lists have proven to be a useful method of informing NASA employees nationwide about the subject coverage of the library collection. All resources included on the lists are available at or through NASA Headquarters Library. NASA employees at other Centers may request listed books through interlibrary loan, and listed articles by contacting me by phone, mail, or e-mail.

  5. "Project Management Controls with Systems."

    ERIC Educational Resources Information Center

    Dell' Isola, A. J.

    There have recently been a number of new concepts introduced into the building industry to reduce building costs. In this speech, the author illustrates how three of these new concepts -- construction management, building systems, and value engineering -- can be combined to effect significant reduction in both the initial and the ownership costs…

  6. Non-Profit/Higher Education Project Management Series: Project Management (PM) Foundations

    ERIC Educational Resources Information Center

    Burgher, Karl E.; Snyder, Michael B.

    2012-01-01

    This is the first in a series of forum articles on applying project management (PM) techniques and tools to the nonprofit sector with a focus on higher education. The authors will begin with a traditional look at project management because they believe that the integration of the tools and the processes associated with PM into many campus offices…

  7. The PI-Mode of Project Management

    NASA Technical Reports Server (NTRS)

    Isaac, Dan

    1997-01-01

    The PI-Mode is NASA's new approach to project management. It responds to the Agency's new policy to develop scientific missions that deliver the highest quality science for a fixed cost. It also attempts to provide more research opportunities by reducing project development times and increasing the number of launches per year. In order to accomplish this, the Principal Investigator is placed at the helm of the project with full responsibility over all aspects of the mission, including instrument and spacecraft development, as well as mission operations and data analysis. This paper intends to study the PI-Mode to determine the strengths and weaknesses of such a new project management technique. It also presents an analysis of its possible impact on the scientific community and its relations with industry, NASA, and other institutions.

  8. Cesium legacy safety project management work plan

    SciTech Connect

    Durham, J.S.

    1998-04-21

    This Management Work Plan (MWP) describes the process flow, quality assurance controls, and the Environment, Safety, and Health requirements of the Cesium Legacy Safety Project. This MWP provides an overview of the project goals and methods for repackaging the non-conforming Type W overpacks and packaging the CsCl powder and pellets. This MWP is not intended to apply to other activities associated with the CsCl Legacy Safety Program (i.e., clean out of South Cell).

  9. Modelling the Management of Systems Engineering Projects

    DTIC Science & Technology

    2013-02-01

    management. Particularly in early concept development phases of a project, it is important for those involved in Model-Based Systems Engineering ( MBSE ) to...the MBSE methods and technical activities they are conducting. In his paper at the 2004 INCOSE International Symposium19, Eric Honour concludes...the project from the point of view of the SEM provides the benefits inherent in the application of MBSE ; consistency, traceability, reuse and

  10. International Project Management Committee: Overview and Activities

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward

    2010-01-01

    This slide presentation discusses the purpose and composition of the International Project Management Committee (IMPC). The IMPC was established by members of 15 space agencies, companies and professional organizations. The goal of the committee is to establish a means to share experiences and best practices with space project/program management practitioners at the global level. The space agencies that are involved are: AEB, DLR, ESA, ISRO, JAXA, KARI, and NASA. The industrial and professional organizational members are Comau, COSPAR, PMI, and Thales Alenia Space.

  11. Project Management in NASA: The system and the men

    NASA Technical Reports Server (NTRS)

    Pontious, R. H.; Barnes, L. B.

    1973-01-01

    An analytical description of the NASA project management system is presented with emphasis on the human element. The NASA concept of project management, program managers, and the problems and strengths of the NASA system are discussed.

  12. SP-100, a project manager's view

    NASA Technical Reports Server (NTRS)

    Truscello, Vincent C.

    1983-01-01

    Born to meet the special needs of America's space effort, the SP-100 Program testifies to the cooperation among government agencies. The Department of Energy (DOE), the National Aeronautics and Space Administration (NASA), and the Defense Advanced Research Projects Agency (DARPA) are working together to produce a 100-kW power system for use in outer space. At this point in the effort, it is appropriate to review: The approach to meet program goals; the status of activities of the Project Office, managed by the Jet Propulsion Laboratory (JPL); and, because this is a meeting on materials, answers beings developed by the Project Office to vital questions on refractory alloy technology.

  13. The NCC project: A quality management perspective

    NASA Technical Reports Server (NTRS)

    Lee, Raymond H.

    1993-01-01

    The Network Control Center (NCC) Project introduced the concept of total quality management (TQM) in mid-1990. The CSC project team established a program which focused on continuous process improvement in software development methodology and consistent deliveries of high quality software products for the NCC. The vision of the TQM program was to produce error free software. Specific goals were established to allow continuing assessment of the progress toward meeting the overall quality objectives. The total quality environment, now a part of the NCC Project culture, has become the foundation for continuous process improvement and has resulted in the consistent delivery of quality software products over the last three years.

  14. The Validity of Graduate Management Admission Test Scores: A Summary of Studies Conducted from 1997 to 2004

    ERIC Educational Resources Information Center

    Talento-Miller, Eileen; Rudner, Lawrence M.

    2008-01-01

    The validity of Graduate Management Admission Test (GMAT) scores is examined by summarizing 273 studies conducted between 1997 and 2004. Each of the studies was conducted through the Validity Study Service of the test sponsor and contained identical variables and statistical methods. Validity coefficients from each of the studies were corrected…

  15. Estimating the Relationship between Use of Test-Preparation Methods and Scores on the Graduate Management Admission Test.

    ERIC Educational Resources Information Center

    Leary, Linda F.; Wightman, Lawrence E.

    This study sought to examine the relationship between five methods of test preparation and test performance as measured by Graduate Management Admission Test (GMAT) Verbal, Quantitative and Total scores. Data on method of test preparation were obtained through voluntary examinee response to five questions which appeared on the answer sheets. One…

  16. The 12th I. E. Melhus Graduate Student Symposium: host plant resistance and disease management, current status and future outlook

    Technology Transfer Automated Retrieval System (TEKTRAN)

    The 12th I. E. Melhus Graduate Student Symposium was held on 6 August 2012 during the Annual meeting of the American Phytopathological Society (APS) in Providence, RI. The theme for this symposium was “Host Plant Resistance and Disease Management: Current Status and Future Outlook”. The APS Host R...

  17. Increasing Graduate Management Education Candidate Diversity: Improving Attraction to Underrepresented Segments. GMAC® Research Report RR-16-03

    ERIC Educational Resources Information Center

    White, Sabrina; Rea, Jeff

    2016-01-01

    This white paper, "Increasing Graduate Management Education Candidate Diversity: Improving Attraction to Underrepresented Segments," presents findings from a research study that GMAC commissioned from globalsojourn, a market strategy and research firm, to gain insights into the dynamics of the perceptions and interest of U.S.…

  18. An Examination of the Effects of Flow on Learning in a Graduate-Level Introductory Operations Management Course

    ERIC Educational Resources Information Center

    Klein, Barbara D.; Rossin, Don; Guo, Yi Maggie; Ro, Young K.

    2010-01-01

    The authors investigated the effects of flow on learning outcomes in a graduate-level operations management course. Flow was assessed through an overall flow score, four dimensions of flow, and three characteristics of flow activities. Learning outcomes were measured objectively through multiple-choice quiz scores and subjectively using measures…

  19. A New Tool for Effective and Efficient Project Management

    SciTech Connect

    Willett, Jesse A

    2011-12-01

    Organizations routinely handle thousands of projects per year, and it is difficult to manage all these projects concurrently. Too often, projects do not get the attention they need when they need it. Management inattention can lead to late projects or projects with less than desirable content and/or deliverables. This paper discusses the application of Visual Project Management (VPM) as a method to track and manage projects. The VPM approach proved to be a powerful management tool without the overhead and restrictions of traditional management methods.

  20. Lessons Learned from Client Projects in an Undergraduate Project Management Course

    ERIC Educational Resources Information Center

    Pollard, Carol E.

    2012-01-01

    This work proposes that a subtle combination of three learning methods offering "just in time" project management knowledge, coupled with hands-on project management experience can be particularly effective in producing project management students with employable skills. Students were required to apply formal project management knowledge to gain…

  1. A Graduate Nursing Curriculum for the Evaluation and Management of Urinary Incontinence

    ERIC Educational Resources Information Center

    Rogalski, Nicole

    2005-01-01

    Geriatric nurse practitioners should be educated in the evaluation and treatment of common geriatric syndromes like urinary incontinence. However, many advanced-practice nursing programs do not place an educational emphasis on urinary incontinence management. The purpose of this project is to provide information that supports the need for…

  2. AVLIS Production Plant Project Management Plan

    SciTech Connect

    Not Available

    1984-11-15

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables.

  3. Building a Propulsion Experiment Project Management Environment

    NASA Technical Reports Server (NTRS)

    Keiser, Ken; Tanner, Steve; Hatcher, Danny; Graves, Sara

    2004-01-01

    What do you get when you cross rocket scientists with computer geeks? It is an interactive, distributed computing web of tools and services providing a more productive environment for propulsion research and development. The Rocket Engine Advancement Program 2 (REAP2) project involves researchers at several institutions collaborating on propulsion experiments and modeling. In an effort to facilitate these collaborations among researchers at different locations and with different specializations, researchers at the Information Technology and Systems Center,' University of Alabama in Huntsville, are creating a prototype web-based interactive information system in support of propulsion research. This system, to be based on experience gained in creating similar systems for NASA Earth science field experiment campaigns such as the Convection and Moisture Experiments (CAMEX), will assist in the planning and analysis of model and experiment results across REAP2 participants. The initial version of the Propulsion Experiment Project Management Environment (PExPM) consists of a controlled-access web portal facilitating the drafting and sharing of working documents and publications. Interactive tools for building and searching an annotated bibliography of publications related to REAP2 research topics have been created to help organize and maintain the results of literature searches. Also work is underway, with some initial prototypes in place, for interactive project management tools allowing project managers to schedule experiment activities, track status and report on results. This paper describes current successes, plans, and expected challenges for this project.

  4. MSFC Propulsion Systems Department Knowledge Management Project

    NASA Technical Reports Server (NTRS)

    Caraccioli, Paul A.

    2007-01-01

    This slide presentation reviews the Knowledge Management (KM) project of the Propulsion Systems Department at Marshall Space Flight Center. KM is needed to support knowledge capture, preservation and to support an information sharing culture. The presentation includes the strategic plan for the KM initiative, the system requirements, the technology description, the User Interface and custom features, and a search demonstration.

  5. Learning the ABCs (of Project Management)

    NASA Technical Reports Server (NTRS)

    Frandsen, Allan

    2003-01-01

    To lead a project effectively, one has to establish and maintain the flexibility to take appropriate actions when needed. Overconstrained situations should be avoided. To get on top of matters and stay there, a manager needs to anticipate what it will take to successfully complete the job. Physical and financial resources, personnel, and management structure are all important considerations. Carving out the necessary turf up front can make a world of difference to the project's outcome. After the "what," "where," and "when" of a project are nailed down, the next question is "how" to do the job. When I first interviewed for the job of Science Payload Manager on the Advanced Composition (ACE) Explorer mission, Dr. Edward Stone (ACE Principal Investigator) asked, "Al, give me an idea of your management style." It was a question I had not considered before. I thought about it for a few seconds and then answered, "Well, the first descriptive term that comes to mind is the word "tranquility". That seemed to startle him. So I added, "I guess what I mean is, that if the situation is tranquil and the project is running smoothly, then I've anticipated all the problems and taken necessary actions to head them off." He then asked: "Have you ever reached this state?" "No," I admitted, "but I strive for it." That seemed to satisfy him because I got the job.

  6. 76 FR 67400 - Capital Project Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... TRANSPORTATION Federal Transit Administration 49 CFR Part 633 RIN 2132-AA92 Capital Project Management AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Extension of comment period on proposed rule and notice... NPRM or the Federal Transit Administrator's Dear Colleague letter of September 30, 2011....

  7. 76 FR 56363 - Capital Project Management

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-13

    ... docket number (FTA-2009-0030) by any of the following methods: Federal eRulemaking Portal: Go to http... meant to address are described in detail, below. The plain text of 49 U.S.C. 5327(e) authorizes FTA to... oversight and to take more control of ] local project management processes, leading to increased...

  8. Project Management Approaches for Online Learning Design

    ERIC Educational Resources Information Center

    Eby, Gulsun; Yuzer, T. Volkan

    2013-01-01

    Developments in online learning and its design are areas that continue to grow in order to enhance students' learning environments and experiences. However, in the implementation of new technologies, the importance of properly and fairly overseeing these courses is often undervalued. "Project Management Approaches for Online Learning Design"…

  9. Experiences in managing the Prometheus Project

    NASA Technical Reports Server (NTRS)

    Lehman, David H.; Clark, Karla B.; Cook, Beverly A.; Gavit, Sarah A.; Kayali, Sammy A.; McKinney, John C.; Milkovich, David C.; Reh, Kim R.; Taylor, Randall L.; Casani, John R.

    2006-01-01

    Congress authorized NASA?s Prometheus Project in February 2003, with the first Prometheus mission slated to explore the icy moons of Jupiter. The Project had two major objectives: (1) to develop a nuclear reactor that would provide unprecedented levels of power and show that it could be processed safely and operated reliably in space for long-duration, deep-space exploration and (2) to explore the three icy moons of Jupiter - Callisto, Ganymede, and Europa - and return science data that would meet the scientific goals as set forth in the Decadal Survey Report of the National Academy of Sciences. Early in Project planning, it was determined that the development of the Prometheus nuclear powered Spaceship would be complex and require the intellectual knowledge residing at numerous organizations across the country. In addition, because of the complex nature of the Project and the multiple partners, approaches beyond those successfully used to manage a typical JPL project would be needed. This paper1 will describe the key experiences in managing Prometheus that should prove useful for future projects of similar scope and magnitude

  10. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  11. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  12. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  13. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  14. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The...

  15. The Impact of Graduate First Project on Students with Disabilities: Perceptions of Key Personnel

    ERIC Educational Resources Information Center

    Foley, Tamera Garrett

    2012-01-01

    The Graduate First initiative was implemented to address the dropout crisis among students with disabilities in the state of Georgia, who continue to demonstrate a rate of attrition twice that of their non-disabled peers (Georgia Department of Education [GA DOE], 2010). This mixed method case study explored the perceptions and experiences of a…

  16. Professional Development through Community Partnership: How a Class Project Led to Graduate Student Teaching Practices

    ERIC Educational Resources Information Center

    Laidemitt, Heidi; DeMola, Sarah; Martin, Jaymee; Kelley, Caroline

    2012-01-01

    This article is written from the perspective of 4 current MA TESOL graduate students at the Monterey Institute of International Studies (MIIS). These students have written about their experiences by incorporating their theoretical and pedagogical English language-teaching knowledge into the growth and maintenance of a community-based ESL program…

  17. Projections: From a Graduate TELL Class to the Practical World of L2 Teachers

    ERIC Educational Resources Information Center

    Ebsworth, Miriam Eisenstein; Kim, Alexis Jeong; Klein, Tristin J.

    2010-01-01

    Our action research study used a mixed design to explore the experiences of 90 pre- and in-service ESL, foreign language (FL), and bilingual teachers in studying and incorporating technology-enhanced language learning (TELL) in their classrooms. Through focus on a TELL graduate course, we considered participants' expectations, experiences, and…

  18. A Pilot Project in Augmentative Distance Learning... George Mason University Graduate Course in Biochemistry.

    ERIC Educational Resources Information Center

    Willett, James D.; Keefe, David D.

    This paper describes the use of distance learning capabilities to augment and amplify the learning opportunities for part-time graduate students at George Mason University. The students in the biochemistry course described meet periodically on campus for brief interactions with the instructor and peer classmates. Between these synchronous…

  19. High School Graduates' Perceptions of Senior Project and College and Work Readiness: A Mixed Methods Study

    ERIC Educational Resources Information Center

    Pennacchia, Donna

    2010-01-01

    State testing or end-of-course exams are recommended to determine if high school graduates are ready to enter college or the workforce because these assessments are aligned to content area expectations and standards that are measurable within each state as well as from state to state (Achieve, 2006). However, such assessments do not measure all…

  20. The Effectiveness of Software Project Management Practices: A Quantitative Measurement

    DTIC Science & Technology

    2011-03-01

    management than most 6 professional managers expect ( Fairley , 2009). There are, in fact, very few Software Project Management Maturity Models (SPMMM) in...work activities and tasks that utilizes resources to achieve specified objectives within a prescribed time frame ( Fairley , 2009). Software Project...coordinating and leading, and managing risk factors for a software project ( Fairley , 2009). 11 Best Practices: Best practices are reusable

  1. Correlational Study of Risk Management and Information Technology Project Success

    ERIC Educational Resources Information Center

    Gillespie, Seth J.

    2014-01-01

    Many IT projects fail despite the best efforts to keep these projects within budget, schedule, and scope. Few studies have looked at the effect of project risk management tools and techniques on project success. The primary focus of this study was to examine the extent to which utilization of project risk management processes influence project…

  2. Agent-Based Simulations for Project Management

    NASA Technical Reports Server (NTRS)

    White, J. Chris; Sholtes, Robert M.

    2011-01-01

    Currently, the most common approach used in project planning tools is the Critical Path Method (CPM). While this method was a great improvement over the basic Gantt chart technique being used at the time, it now suffers from three primary flaws: (1) task duration is an input, (2) productivity impacts are not considered , and (3) management corrective actions are not included. Today, computers have exceptional computational power to handle complex simulations of task e)(eculion and project management activities (e.g ., dynamically changing the number of resources assigned to a task when it is behind schedule). Through research under a Department of Defense contract, the author and the ViaSim team have developed a project simulation tool that enables more realistic cost and schedule estimates by using a resource-based model that literally turns the current duration-based CPM approach "on its head." The approach represents a fundamental paradigm shift in estimating projects, managing schedules, and reducing risk through innovative predictive techniques.

  3. NASA's Cryogenic Fluid Management Technology Project

    NASA Technical Reports Server (NTRS)

    Tramel, Terri L.; Motil, Susan M.

    2008-01-01

    The Cryogenic Fluid Management (CFM) Project's primary objective is to develop storage, transfer, and handling technologies for cryogens that will support the enabling of high performance cryogenic propulsion systems, lunar surface systems and economical ground operations. Such technologies can significantly reduce propellant launch mass and required on-orbit margins, reduce or even eliminate propellant tank fluid boil-off losses for long term missions, and simplify vehicle operations. This paper will present the status of the specific technologies that the CFM Project is developing. The two main areas of concentration are analysis models development and CFM hardware development. The project develops analysis tools and models based on thermodynamics, hydrodynamics, and existing flight/test data. These tools assist in the development of pressure/thermal control devices (such as the Thermodynamic Vent System (TVS), and Multi-layer insulation); with the ultimate goal being to develop a mature set of tools and models that can characterize the performance of the pressure/thermal control devices incorporated in the design of an entire CFM system with minimal cryogen loss. The project does hardware development and testing to verify our understanding of the physical principles involved, and to validate the performance of CFM components, subsystems and systems. This database provides information to anchor our analytical models. This paper describes some of the current activities of the NASA's Cryogenic Fluid Management Project.

  4. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    SciTech Connect

    Burritt, James G.; Berkey, Edgar

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  5. Knocking at the College Door: Projections of High School Graduates by State and Race/Ethnicity, 1992-2022. District of Columbia

    ERIC Educational Resources Information Center

    Western Interstate Commission for Higher Education, 2008

    2008-01-01

    The 7th edition of this publication provides updated projections of high school graduates for each year and each state (plus the District of Columbia) through 2022. The profile breaks down the projections by major racial and ethnic groups: (1) American Indian/Alaska Native; (2) Asian/Pacific Islander; (3) Black, non-Hispanic; (4) Hispanic; and (5)…

  6. A Semester-Long Project for Teaching Basic Techniques in Molecular Biology Such as Restriction Fragment Length Polymorphism Analysis to Undergraduate and Graduate Students

    ERIC Educational Resources Information Center

    DiBartolomeis, Susan M.

    2011-01-01

    Several reports on science education suggest that students at all levels learn better if they are immersed in a project that is long term, yielding results that require analysis and interpretation. I describe a 12-wk laboratory project suitable for upper-level undergraduates and first-year graduate students, in which the students molecularly…

  7. Successful healthcare programs and projects: organization portfolio management essentials.

    PubMed

    Pickens, Scott; Solak, Jamie

    2005-01-01

    Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes.

  8. Marketing and Student Recruitment Practices for Master's-Level Graduate Programs, 2012. Trends in Enrollment Management

    ERIC Educational Resources Information Center

    Noel-Levitz, Inc, 2012

    2012-01-01

    What's working in the area of marketing and recruiting for master's-level graduate programs? To find out, the National Association of Graduate Admissions Professionals (NAGAP) and Noel-Levitz conducted a national, Web-based poll to determine and report the most effective practices. Highlights from the findings: (1) Among the "top 10" most…

  9. The Impact of Work Placements on Skills Development and Career Outcomes for Business and Management Graduates

    ERIC Educational Resources Information Center

    Wilton, Nick

    2012-01-01

    It has become a received wisdom that the completion of a work placement as part of a sandwich undergraduate degree is of positive benefit both to graduates and employers, particularly in an era that stresses the economic contribution of higher education through developing graduate employability. This benefit is twofold: first, work placements…

  10. Does a Management Degree Do the Business for Women in the Graduate Labour Market?

    ERIC Educational Resources Information Center

    Wilton, Nick

    2007-01-01

    The increasing dominance of an economic ideology of higher education, that its principal role is to contribute to national competitiveness, has increased focus on the employability of graduates and their transition into the labour market. Drawing on a major study of the early career paths of 1995 graduates from 38 UK higher education institutions,…

  11. Strategic Mobility 21 Project Management Plan

    DTIC Science & Technology

    2006-09-29

    UNCLASSIFIED Strategic Mobility 21 Project Management Plan Contractor Report 0004 Prepared for: Office of Naval Research 875 North...98) REPORT DOCUMENTATION PAGE Prescribed by ANSI Std. Z39.18 Form Approved OMB No. 0704-0188 The public reporting burden for this collection of...Directorate for Information Operations and Reports (0704-0188), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302. Respondents should

  12. KBSA Project Management Assistant. Volume 1.

    DTIC Science & Technology

    1987-07-01

    Technical Report July 1967 KBSA PROJECT MANAGEMENT ASSISTANT Kestrel Institute Richard J0illi9, Wolfgang Polak, Peter Ladkin and Li-Mel Gilham APPROVED FOR...lieediuig im1provemuemit v" 1.:!, * (i~f suich alimel Mt sagi-;1 imuplie’. t~wll nr" forI thi’. P, \\ !oA to pil~vile ait 1"’ 1-’ I Iser Iit lrIfhIe

  13. Data Management and Sharing from the Perspective of Graduate Students: An Examination of the Culture and Practice at the Water Quality Field Station

    ERIC Educational Resources Information Center

    Carlson, Jake; Stowell-Bracke, Marianne

    2013-01-01

    Libraries are actively seeking to identify and respond to the data management and curation needs of researchers. One important perspective often overlooked in acquiring an understanding is that of graduate students. This case study used the Data Curation Profile Toolkit to interview six graduate students working for agronomy researchers at the…

  14. Is Bologna Working? Employer and Graduate Reflections of the Quality, Value and Relevance of Business and Management Education in Four European Union Countries

    ERIC Educational Resources Information Center

    Andrews, Jane; Higson, Helen

    2014-01-01

    This article focuses on the relevance of undergraduate business and management higher education from the perspectives of recent graduates and graduate employers in four European countries. Drawing upon the findings of an empirical qualitative study in which data was collated and analysed using grounded theory research techniques, the paper draws…

  15. Traditional Project Management and the Visual Workplace Environment to Improve Project Success

    ERIC Educational Resources Information Center

    Fichera, Christopher E.

    2016-01-01

    A majority of large IT projects fail to meet scheduled deadlines, are over budget and do not satisfy the end user. Many projects fail in spite of utilizing traditional project management techniques. Research of project management has not identified the use of a visual workspace as a feature affecting or influencing the success of a project during…

  16. The Utilization of Project Management in the Pharmaceutical Industry.

    ERIC Educational Resources Information Center

    Krusko, Diane; Cangemi, Robert R.

    1987-01-01

    A survey of 99 pharmaceutical companies concerning their organization and use of project management techniques for research and development found that the industry is using project management increasingly in a variety of ways for better business planning and operations. (MSE)

  17. Project ExPreSS: Social studies and science remediation program for the Georgia High School Graduation Test

    NASA Astrophysics Data System (ADS)

    Shearouse, Randy

    Over half of the states now require students to pass a high stakes exit exam before being allowed to graduate from high school. No Child Left Behind requires that standardized testing be included to determine whether or not a school makes Adequate Yearly Progress (AYP). The purpose of this study is to examine the results of the Georgia High School Graduation Test (GHSGT) of students who participated in the remedial program Project ExPreSS with those students who did not participate. Using a quantitative research design, the question that will be answered is whether Project ExPreSS makes a difference in passing the GHSGT in science and social studies among three groups: all Georgia students, African American students in one Georgia school system, and all students in one Georgia school system. A chi-square test was conducted and a determination was made that there is a statistically significant relationship between project participation and pass-fail status in all but one area. The majority of students in this study were 17--18 years of age and were taking the science or social studies section of the GHSGT for the second time. The findings of this study will be important not only for Georgia and the school system examined, but also for other states and systems that give High Stakes Exit Exams (HSEEs). The results indicate that highly focused remedial programs like Project ExPreSS make a difference for students who may not be successful on their first attempt at passing a HSEE.

  18. [Integrated management of childhood illness (IMCI) in the practice of nurses graduated from USP].

    PubMed

    Higuchi, Cinthia Hiroko; Fujimori, Elizabeth; Cursino, Emília Gallindo; Chiesa, Anna Maria; Veríssimo, Maria de la O Ramallo; de Mello, Débora Falleiros

    2011-06-01

    This is a description of the Integrated Management of Childhood Illness (IMCI) strategy in the professional practice of nurses graduated from the School of Nursing of University of São Paulo (EE-USP). This is a case study of qualitative approach. The data were collected through focus groups and analyzed using thematic content analysis. IMCI strategy was considered an important tool in child health care, but only the assessment module was apart of professional practice. Difficulties in the use of the IMCI were: the strategy was not implanted at health services, it was unknown by co-workers and institutional obstacles. In spite of the limited and non-systematic use of IMCI, it has allowed nurses to provide integrated and comprehensive attention to the child, which justifies its teaching on undergraduate courses. Maintenance of the educational video, expansion of the practice, integration of courses and optimization of content and workload were suggested for improving the teaching of IMCI at the undergraduate level.

  19. Which common clinical conditions should medical students be able to manage by graduation? A perspective from Australian interns.

    PubMed

    Rolfe, I E; Pearson, S-A; Sanson-Fisher, R W; Ringland, C; Bayley, S; Hart, A; Kelly, S

    2002-01-01

    The objectives of the study were to report the development of a core curriculum that details the clinical conditions medical students should be able to manage upon graduation; and to canvass the opinion of interns (first-year postgraduate doctors) regarding their perceptions of the level of skill required to manage each condition. Literature relating to core curriculum development and training of junior medical officers was reviewed and stakeholders in the education and training of medical students and junior doctors in the state of New South Wales, Australia (intern supervisors, academics, registrars, nurses and interns) were consulted. The final curriculum spanned 106 conditions, 77 'differentiated' and 29 'undifferentiated'. Four levels of skill at which conditions should potentially be managed were also identified: 'Theoretical knowledge only'; 'Recognize symptoms and signs without supervision'; Initiate preliminary investigations, management and/or treatment without supervision'; and 'Total investigation, management and/or treatment without supervision'. The list of conditions in the curriculum was converted to a survey format and a one-in-two random sample of interns (n = 193) practising in New South Wales who graduated from the state's three medical schools were surveyed regarding the level of skill required for managing each clinical condition at graduation. A total of 51.3% of interns responded to the survey. Interns felt they should be able to initiate preliminary investigation, management and/or treatment for most conditions in the curriculum, with more than half acknowledging this level of management for 53 of the differentiated and 28 of the undifferentiated conditions. It is concluded that developing core curricula in medical education can involve multiple stakeholders, including junior doctors as the consumers of educational experiences. The data gathered may be useful to medical schools revising their curricula.

  20. Financial arrangement selection for energy management projects

    NASA Astrophysics Data System (ADS)

    Woodroof, Eric Aubrey

    Scope and method of study. The purpose of this study was to develop a model (E-FUND) to help facility managers select financial arrangements for energy management projects (EMPs). The model was developed with the help of a panel of expert financiers. The panel also helped develop a list of key objectives critical to the decision process. The E-FUND model was tested by a population of facility managers in four case studies. Findings and conclusions. The results may indicate that having a high economic benefit (from an EMP) is not overwhelmingly important, when compared to other qualitative objectives. The results may also indicate that the true lease and performance contract may be the most applicable financial arrangements for EMPs.

  1. Effective Time Management in the Project Office. Executive Summary.

    DTIC Science & Technology

    1976-11-05

    manager. It can be concluded from the study that project managers have difficulty in managing their time and that although neglected, time management should...be taught to project managers so as to preclude spending an inordinate amount of time to accomplish their job. An understanding and use of the time ... management principles delineated in the study should allow the manager to make much more effective use of his available time. (Author)

  2. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are...

  3. 7 CFR 3560.102 - Housing project management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Housing project management. 3560.102 Section 3560.102... § 3560.102 Housing project management. (a) General. Borrowers hold final responsibility for housing project management and must ensure that operations comply with the terms of all loan or grant...

  4. 7 CFR 3560.102 - Housing project management.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Housing project management. 3560.102 Section 3560.102... § 3560.102 Housing project management. (a) General. Borrowers hold final responsibility for housing project management and must ensure that operations comply with the terms of all loan or grant...

  5. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are...

  6. 7 CFR 3560.102 - Housing project management.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Housing project management. 3560.102 Section 3560.102... § 3560.102 Housing project management. (a) General. Borrowers hold final responsibility for housing project management and must ensure that operations comply with the terms of all loan or grant...

  7. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are...

  8. 7 CFR 3560.102 - Housing project management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Housing project management. 3560.102 Section 3560.102... § 3560.102 Housing project management. (a) General. Borrowers hold final responsibility for housing project management and must ensure that operations comply with the terms of all loan or grant...

  9. 7 CFR 3560.102 - Housing project management.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Housing project management. 3560.102 Section 3560.102... § 3560.102 Housing project management. (a) General. Borrowers hold final responsibility for housing project management and must ensure that operations comply with the terms of all loan or grant...

  10. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are...

  11. 24 CFR 990.275 - Project-based management (PBM).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Project-based management (PBM). 990... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.275 Project-based... of rental housing at the project level. Under PBM, these property management services are...

  12. Preparing Future Leaders: Project Management Strategies for Service Learning

    ERIC Educational Resources Information Center

    Munger, Roger; Gutowski, Amanda

    2008-01-01

    This article makes a case for teaching project management strategies in service-learning courses. The authors describe three specific documents students can create to help them manage a service-learning project and then present strategies that can help students manage their project teams. Such skills, the authors argue, provide the tools students…

  13. Management of major system programs and projects. Handbook

    NASA Technical Reports Server (NTRS)

    1993-01-01

    This Handbook establishes the detailed policies and processes for implementing NMI 7120.4, 'Management of Major System Programs and Projects'. It constitutes a comprehensive source of the specific policies and processes governing management of major development programs/projects and is intended as a resource to the entire program/project management (PPM) community.

  14. Project management plan for the Objective Supply Capability Adaptive Redesign (OSCAR) project

    SciTech Connect

    Rasch, K.A.; Reid, R.W.

    1997-02-01

    This document establishes the project management plan for design and development of the Object Supply Capability Adaptive Redesign (OSCAR) Project. The purpose of the project management plan is to document the plans, goals, directions, commitments, approaches, and decisions that relate to guiding a project throughout its life cycle. Special attention is given to project goals, deliverables, sponsor and project standards, project resources, schedule, and cost estimates.

  15. Managing Complex Distance Education Projects in a Telework Environment

    ERIC Educational Resources Information Center

    Ally, Mohamed; Cleveland-Innes, Marti; Wiseman, Colin

    2010-01-01

    The advances of communication technologies have allowed professionals to work on distance education projects in a telework environment. Managers of these projects must have the skills to manage the projects from a distance. They must be able to select the appropriate team members to work on the project, orient team members, and monitor team…

  16. Managing Community Projects for Change. NIACE Lifelines in Adult Learning.

    ERIC Educational Resources Information Center

    Eldred, Jan

    This document presents practical advice to help managers of adult learning projects in communities across the United Kingdom manage their community projects for change. The following topics are discussed in sections 1-12: (1) the benefits of adult learning projects; (2) characteristics of adult learning projects and quality assurance mechanisms;…

  17. Utilizing Project Management Techniques in the Design of Instructional Materials.

    ERIC Educational Resources Information Center

    Murphy, Charles

    1994-01-01

    Discussion of instructional design in large organizations highlights a project management approach. Topics addressed include the role of the instructional designer; project team selection; role of the team members; role of the project manager; focusing on what employees need to know; types of project teams; and monitoring time and responsibility.…

  18. Discriminating between Failures and Graduates in a Computer-Managed Course using Measures of Cognitive Styles, Abilities, and Aptitudes

    DTIC Science & Technology

    1979-06-01

    NUMllf.ft J. 1 ’ i l ■ i -«t-r Subflrl*^ DISCRIMINATING BETWEEN FAILURES AND GRADUATES IN A COMPUTER-MANAGED COURSE USING MEASURES OF...measures could optimally differentiate the two groups. Classification functions obtained for derived discriminant functions were applied to measures of...cognitive characteristics obtained for the study participants to evaluate the effec- tiveness of the discriminations in predicting group membership

  19. The Dust Management Project: Final Report

    NASA Technical Reports Server (NTRS)

    Hyatt, Mark J.; Straka, Sharon

    2011-01-01

    A return to the Moon to extend human presence, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth s economic sphere, will require investment in developing new technologies and capabilities to achieve affordable and sustainable human exploration. From the operational experience gained and lessons learned during the Apollo missions, conducting longterm operations in the lunar environment will be a particular challenge, given the difficulties presented by the unique physical properties and other characteristics of lunar regolith, including dust. The Apollo missions and other lunar explorations have identified significant lunar dust-related problems that will challenge future mission success. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems and human explorers. The Dust Management Project (DMP) is tasked with the evaluation of lunar dust effects, assessment of the resulting risks, and development of mitigation and management strategies and technologies related to Exploration Systems architectures. To this end, the DMP supports the overall goal of the Exploration Technology Development Program (ETDP) of addressing the relevant high priority technology needs of multiple elements within the Constellation Program (CxP) and sister ETDP projects. Project scope, approach, accomplishments, summary of deliverables, and lessons learned are presented.

  20. Practical science communication strategies for graduate students.

    PubMed

    Kuehne, Lauren M; Twardochleb, Laura A; Fritschie, Keith J; Mims, Meryl C; Lawrence, David J; Gibson, Polly P; Stewart-Koster, Ben; Olden, Julian D

    2014-10-01

    Development of skills in science communication is a well-acknowledged gap in graduate training, but the constraints that accompany research (limited time, resources, and knowledge of opportunities) make it challenging to acquire these proficiencies. Furthermore, advisors and institutions may find it difficult to support graduate students adequately in these efforts. The result is fewer career and societal benefits because students have not learned to communicate research effectively beyond their scientific peers. To help overcome these hurdles, we developed a practical approach to incorporating broad science communication into any graduate-school time line. The approach consists of a portfolio approach that organizes outreach activities along a time line of planned graduate studies. To help design the portfolio, we mapped available science communication tools according to 5 core skills essential to most scientific careers: writing, public speaking, leadership, project management, and teaching. This helps graduate students consider the diversity of communication tools based on their desired skills, time constraints, barriers to entry, target audiences, and personal and societal communication goals. By designing a portfolio with an advisor's input, guidance, and approval, graduate students can gauge how much outreach is appropriate given their other commitments to teaching, research, and classes. The student benefits from the advisors' experience and mentorship, promotes the group's research, and establishes a track record of engagement. When graduate student participation in science communication is discussed, it is often recommended that institutions offer or require more training in communication, project management, and leadership. We suggest that graduate students can also adopt a do-it-yourself approach that includes determining students' own outreach objectives and time constraints and communicating these with their advisor. By doing so we hope students will

  1. Environmental Management Assessment of the Fernald Environmental Management Project (FEMP)

    SciTech Connect

    Not Available

    1993-04-01

    This report documents the results of the Environmental Management Assessment performed at the Fernald Environmental Management Project (FEMP) in Fernald, Ohio. During this assessment, the activities conducted by the assessment team included review of internal documents and reports from previous audits and assessments; interviews with US Department of Energy (DOE) and FEMP contractor personnel; and inspection and observation of selected facilities and operations. The onsite portion of the assessment was conducted from March 15 through April 1, 1993, by DOE`s Office of Environmental Audit (EH-24) located within the Office of the Assistant Secretary for Environment, Safety, and Health (EH-1). EH-24 carries out independent assessments of DOE facilities and activities as part of the EH-1 Environment, Safety, and Health (ES&H) Oversight Audit Program. The EH-24 program is designed to evaluate the status of DOE facilities and activities with respect to compliance with Federal, state, and local environmental laws and regulations; compliance with DOE Orders, Guidance and Directives; conformance with accepted industry practices and standards of performance; and the status and adequacy of management systems developed to address environmental requirements. The Environmental Management Assessment of FEMP focused on the adequacy of environmental management systems. Further, in response to requests by the Office of Environmental Restoration and Waste Management (EM) and Fernald Field Office (FN), Quality Assurance and Environmental Radiation activities at FEMP were evaluated from a programmatic standpoint. The results of the evaluation of these areas are contained in the Environmental Protection Programs section in this report.

  2. Data warehouse manages offshore project information

    SciTech Connect

    1998-05-04

    A data warehouse adopted from the POSC/Caesar data model will manage the life-cycle information for the offshore Norway Aasgard project. The Aasgard project comprises the Midgard, Smorbukk, and Smorbukk South fields, which lie in 780--985 ft of water. A semisubmersible production facility will handle gas exports, scheduled to begin in 2000. Statoil estimates that recoverable reserves in the fields are 7.5 tcf of gas and 780 million bbl of oil. Notia software components include: the Intergraph asset and information management (AIM) product; the P/C PDM and P/C RDL models; a data mapping, translation, and import toolkit; the application programming interface (API); and query and browser clients. Intergraph describes AIM, with its object management framework (OMF) from metaphase technology, as the engine upon which Notia is based. The P/C PDM defines the data terminology and structure. A dictionary of standard petrochemical data items, the P/C RDL, defines the various activities, materials, components, and relationships among these items. The API allows users to develop additional functionality, and the toolkit provides resources for translating and mapping data from existing sources into a neutral format so that administrators can prepopulate the data warehouse. A worldwide web browser client allows users to query the data warehouse and display results in a variety of configurable formats, including virtual data sheets.

  3. The integrated scheduling system: A case study in project management

    NASA Technical Reports Server (NTRS)

    Bishop, Peter C.; Learned, David B.; Yoes, Cissy A.

    1989-01-01

    A prototype project management system was developed for the Level III Project Office for the Space Station Freedom. The main goal was to establish a framework for the Space Station Project Office whereby Project and Office Managers can jointly establish and review scheduled milestones and activities. The objective was to assist office managers in communicating their objectives, milestones, schedules, and other project information more effectively and efficiently. Consideration of sophisticated project management systems was included, but each of the systems had limitations in meeting the stated objectives.

  4. Understanding the Manager of the Project Front-End

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.; Imprescia, Cliff (Technical Monitor)

    2000-01-01

    Historical data and new findings from interviews with managers of major National Aeronautics and Space Administration (NASA) projects confirm literature reports about the criticality of the front-end phase of project development, where systems engineering plays such a key role. Recent research into the management of ten contemporary NASA projects, combined with personal experience of the author in NASA, provide some insight into the relevance and importance of the project manager in this initial part of the project life cycle. The research findings provide evidence of similar approaches taken by the NASA project manager.

  5. Strategic Project Management at the NASA Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Lavelle, Jerome P.

    2000-01-01

    This paper describes Project Management at NASA's Kennedy Space Center (KSC) from a strategic perspective. It develops the historical context of the agency and center's strategic planning process and illustrates how now is the time for KSC to become a center which has excellence in project management. The author describes project management activities at the center and details observations on those efforts. Finally the author describes the Strategic Project Management Process Model as a conceptual model which could assist KSC in defining an appropriate project management process system at the center.

  6. Project Management Software for Distributed Industrial Companies

    NASA Astrophysics Data System (ADS)

    Dobrojević, M.; Medjo, B.; Rakin, M.; Sedmak, A.

    This paper gives an overview of the development of a new software solution for project management, intended mainly to use in industrial environment. The main concern of the proposed solution is application in everyday engineering practice in various, mainly distributed industrial companies. Having this in mind, special care has been devoted to development of appropriate tools for tracking, storing and analysis of the information about the project, and in-time delivering to the right team members or other responsible persons. The proposed solution is Internet-based and uses LAMP/WAMP (Linux or Windows - Apache - MySQL - PHP) platform, because of its stability, versatility, open source technology and simple maintenance. Modular structure of the software makes it easy for customization according to client specific needs, with a very short implementation period. Its main advantages are simple usage, quick implementation, easy system maintenance, short training and only basic computer skills needed for operators.

  7. Illinois drainage water management demonstration project

    USGS Publications Warehouse

    Pitts, D.J.; Cooke, R.; Terrio, P.J.; ,

    2004-01-01

    Due to naturally high water tables and flat topography, there are approximately 4 million ha (10 million ac) of farmland artificially drained with subsurface (tile) systems in Illinois. Subsurface drainage is practiced to insure trafficable field conditions for farm equipment and to reduce crop stress from excess water within the root zone. Although drainage is essential for economic crop production, there have been some significant environmental costs. Tile drainage systems tend to intercept nutrient (nitrate) rich soil-water and shunt it to surface water. Data from numerous monitoring studies have shown that a significant amount of the total nitrate load in Illinois is being delivered to surface water from tile drainage systems. In Illinois, these drainage systems are typically installed without control mechanisms and allow the soil to drain whenever the water table is above the elevation of the tile outlet. An assessment of water quality in the tile drained areas of Illinois showed that approximately 50 percent of the nitrate load was being delivered through the tile systems during the fallow period when there was no production need for drainage to occur. In 1998, a demonstration project to introduce drainage water management to producers in Illinois was initiated by NRCS4 An initial aspect of the project was to identify producers that were willing to manage their drainage system to create a raised water table during the fallow (November-March) period. Financial assistance from two federal programs was used to assist producers in retrofitting the existing drainage systems with control structures. Growers were also provided guidance on the management of the structures for both water quality and production benefits. Some of the retrofitted systems were monitored to determine the effect of the practice on water quality. This paper provides background on the water quality impacts of tile drainage in Illinois, the status of the demonstration project, preliminary

  8. Risk Management in ETS-8 Project

    NASA Astrophysics Data System (ADS)

    Homma, M.

    2002-01-01

    Engineering Test Satellite - 8 (ETS-8) is the Japanese largest geo-synchronous satellite of 3 tons in mass, of which mission is mobile communications and navigation experiment. It is now in the flight model manufacturing phase. This paper introduces the risk management taken in this project as a reference. The mission success criteria of ETS-8 are described at first. All the risk management activities are planned taking these criteria into consideration. ETS-8 consists of many new technologies such as the large deployable antenna (19m x 17m), 64-bit MPU, 100 V solar paddle and so on. We have to pay attention to control these risk through each phase of development. In system design of ETS - 8, almost components have redundancy and there is some back-up function to avoid fatal failure. What kind of back-up function should be taken is one of the hot issues in this project. The consideration process is described as an actual case. In addition to conventional risk management procedure, FMEA and identification of the critical items so on, we conducted the validation experiment in space by use of a scale model that was launched on Ariane 5. The decision to conduct this kind of experiment is taken after evaluation between risk and cost, because it takes a lot of resources of project. The effect of this experiment is also presented. Failure detection, isolation and reconfiguration in the flight software are more important as the satellite system becomes large and complicated. We did the independent verification and validation to the software. Some remarks are noted with respect to its effectiveness.

  9. Global Software Development Patterns for Project Management

    NASA Astrophysics Data System (ADS)

    Välimäki, Antti; Kääriäinen, Jukka; Koskimies, Kai

    Global software development with the agile or waterfall development process has been taken into use in many companies. GSD offers benefits but also new challenges without known, documented solutions. The goal of this research is to present current best practices for GSD in the form of process patterns for project management, evaluated by using a scenario-based assessment method. The best practices have been collected from a large company operating in process automation. It is expected that the resulting pattern language helps other companies to improve their GSD processes by incorporating the patterns in the processes.

  10. Examination of the relationship between project management critical success factors and project success of oil and gas drilling projects

    NASA Astrophysics Data System (ADS)

    Alagba, Tonye J.

    Oil and gas drilling projects are the primary means by which oil companies recover large volumes of commercially available hydrocarbons from deep reservoirs. These types of projects are complex in nature, involving management of multiple stakeholder interfaces, multidisciplinary personnel, complex contractor relationships, and turbulent environmental and market conditions, necessitating the application of proven project management best practices and critical success factors (CSFs) to achieve success. Although there is some practitioner oriented literature on project management CSFs for drilling projects, none of these is based on empirical evidence, from research. In addition, the literature has reported alarming rates of oil and gas drilling project failure, which is attributable not to technical factors, but to failure of project management. The aim of this quantitative correlational study therefore, was to discover an empirically verified list of project management CSFs, which consistent application leads to successful implementation of oil and gas drilling projects. The study collected survey data online, from a random sample of 127 oil and gas drilling personnel who were members of LinkedIn's online community "Drilling Supervisors, Managers, and Engineers". The results of the study indicated that 10 project management factors are individually related to project success of oil and gas drilling projects. These 10 CSFs are namely; Project mission, Top management support, Project schedule/plan, Client consultation, Personnel, Technical tasks, Client acceptance, Monitoring and feedback, Communication, and Troubleshooting. In addition, the study found that the relationships between the 10 CSFs and drilling project success is unaffected by participant and project demographics---role of project personnel, and project location. The significance of these findings are both practical, and theoretical. Practically, application of an empirically verified CSFs list to oil

  11. Education Project Management in the Information Age: The Case of the Kimberley Thusanang Project

    ERIC Educational Resources Information Center

    Harvey, Stephen

    2004-01-01

    This article reports on the experiences of the Kimberley Thusanang Project (KTP). It proposes that the project's use of a database system as a management tool represents a significant development in the design of effective education projects in South Africa. The article describes how this system assists project management in overcoming two key…

  12. Data Overload Impact on Project Management: How Knowledge Management Systems Can Improve Federal Agencies Effectiveness

    ERIC Educational Resources Information Center

    Rodriguez, Jacinto

    2013-01-01

    This mixed method exploratory case study was used to explore the effect data overload has on project management, how data overload affects project management effectiveness, how prepared program office staff is to manage multiple projects effectively, and how the program office's organizational structure and data management systems affect project…

  13. Project management in the Apollo program: An interdisciplinary study

    NASA Technical Reports Server (NTRS)

    Drucker, E. E.; Pooler, W. S.; Wilemon, D. L.; Wood, B. D.

    1972-01-01

    Findings concerning project management in the NASA Apollo program are presented. The Apollo program in the context of the total NASA organization is examined along with the nature of project management and the manner in which project managers functioned in the Apollo program. The utilization of the in-house technical competence in the support of the Apollo program, and the formal and informal relationships between Apollo managers and the contractors are discussed.

  14. Differences in Graduate School Attainment Patterns across Academic Programs and Demographic Groups. A Research Report of the Minority Graduate Education Project.

    ERIC Educational Resources Information Center

    Zwick, Rebecca

    To identify differences in doctoral student achievement across programs, demographic groups and gender, the graduate careers of nearly 5,000 doctoral students from 11 departments at each of 3 major universities were investigated. Three types of data analysis examined numbers of students entering each department and the proportions of various…

  15. Sex Composition of Criterion Groups in the Discrimination of College Graduating Major Groups. 79-6. Project No. 622.

    ERIC Educational Resources Information Center

    Lunneborg, Clifford E.; Lunneborg, Patricia W.

    To determine the most appropriate use of interest scales in predicting college major at graduation, data from the Vocational Interest Inventory were analyzed. Subjects were 2,175 college graduates who had taken the inventory as high school juniors, and had graduated in one of 22 majors. The effects upon accuracy of classification and conceptual…

  16. Project Management Meets Change Management - A Success Story. Focus Area: Tech Perspectives TI012SN

    NASA Technical Reports Server (NTRS)

    Hall, Wayne

    2011-01-01

    Utilizing the concepts and terminology from Project Management, the process of planning and executing a Change Management (CM) Infrastructure improvement project is described. The primary audience for this presentation includes both experienced and relatively new CM administrators and their managers. It also includes anyone with an interest in the application of project management knowledge to CM administration. There are several benefits: the complexity of the CM tool technology is more manageable, CM administrators get to use project management knowledge to complete a project (not "firefighting"), improve relations with your customers (that means developers and managers), and get the opportunity to do it again.

  17. Mississippi graduate trainee project for DOE EPSCoR. Summary report for year No. 2

    SciTech Connect

    Wertz, D.L.

    1993-10-01

    Three research clusters were selected for emphasis in the Mississippi DOE EPSCoR project: Fossil fuel pollutants, enhanced oil recovery, and power systems and conservation. Brief progress reports are given.

  18. How Configuration Management Helps Projects Innovate and Communicate

    NASA Technical Reports Server (NTRS)

    Cioletti, Louis A.; Guidry, Carla F.

    2009-01-01

    This slide presentation reviews the concept of Configuration Management (CM) and compares it to the standard view of Project management (PM). It presents two PM models: (1) Kepner-Tregoe,, and the Deming models, describes why projects fail, and presents methods of how CM helps projects innovate and communicate.

  19. Building an Experiential Learning Model for a Project Management Course

    ERIC Educational Resources Information Center

    Chen, Kuan C.; Chuang, Keh-Wen

    2009-01-01

    Teaching students to become project management professionals requires a real world experience. Incorporating live clients into student projects, instead of using case studies or mock companies, adds a dimension that exposes students to the realities of project management. This paper will describe a structured methodology used in a project…

  20. An Examination of Assistant Professors' Project Management Practices

    ERIC Educational Resources Information Center

    Alpert, Shannon Atkinson; Hartshorne, Richard

    2013-01-01

    Purpose: The purpose of this research was to identify factors that influence the use of project management in higher education research projects by investigating the project management practices of assistant professors. Design/methodology/approach: Using a grounded theory approach that included in-depth, semi-structured interviews with 22…

  1. Project Management in Instructional Design: ADDIE Is Not Enough

    ERIC Educational Resources Information Center

    Van Rooij, Shahron Williams

    2010-01-01

    In the digital age, instructional designers must possess both a sound instructional design knowledge base and solid project management skills that will enable them to complete courseware projects on time, on budget and in conformance with client expectations. Project management skills include the ability to apply repeatable processes, along with…

  2. Leveraging Text Content for Management of Construction Project Documents

    ERIC Educational Resources Information Center

    Alqady, Mohammed

    2012-01-01

    The construction industry is a knowledge intensive industry. Thousands of documents are generated by construction projects. Documents, as information carriers, must be managed effectively to ensure successful project management. The fact that a single project can produce thousands of documents and that a lot of the documents are generated in a…

  3. Steady Stream of High School Graduates Enter B.C. Public Post-Secondary Education for the First Time Each Year. Research Results from the Student Transitions Project

    ERIC Educational Resources Information Center

    Student Transitions Project, 2014

    2014-01-01

    The Student Transition project (STP) has collected eleven years of grade 12 and post-secondary enrollment data, since it's inception in 2003. This information is used to track student transitions from grade 12 graduation into post-secondary education, student mobility between post-secondary institutions and post-secondary credential completions.…

  4. Advanced Hybrid Particulate Collector Project Management Plan

    SciTech Connect

    Miller, S.J.

    1995-11-01

    As the consumption of energy increases, its impact on ambient air quality has become a significant concern. Recent studies indicate that fine particles from coal combustion cause health problems as well as atmospheric visibility impairment. These problems are further compounded by the concentration of hazardous trace elements such as mercury, cadmium, selenium, and arsenic in fine particles. Therefore, a current need exists to develop superior, but economical, methods to control emissions of fine particles. Since most of the toxic metals present in coal will be in particulate form, a high level of fine- particle collection appears to be the best method of overall air toxics control. However, over 50% of mercury and a portion of selenium emissions are in vapor form and cannot be collected in particulate control devices. Therefore, this project will focus on developing technology not only to provide ultrahigh collection efficiency of particulate air toxic emissions, but also to capture vapor- phase trace metals such as mercury and selenium. Currently, the primary state-of-the-art technologies for particulate control are fabric filters (baghouses) and electrostatic precipitators (ESPs). However, they both have limitations that prevent them from achieving ultrahigh collection of fine particulate matter and vapor-phase trace metals. The objective of this project is to develop a highly reliable advanced hybrid particulate collector (AHPC) that can provide > 99.99 % particulate collection efficiency for all particle sizes between 0.01 and 50 14m, is applicable for use with all U.S. coals, and is cost-0443competitive with existing technologies. Phase I of the project is organized into three tasks: Task I - Project Management, Reporting, and Subcontract Consulting Task 2 - Modeling, Design, and Construction of 200-acfm AHPC Model Task 3 - Experimental Testing and Subcontract Consulting

  5. Integrating configuration workflows with project management system

    NASA Astrophysics Data System (ADS)

    Nilsen, Dimitri; Weber, Pavel

    2014-06-01

    The complexity of the heterogeneous computing resources, services and recurring infrastructure changes at the GridKa WLCG Tier-1 computing center require a structured approach to configuration management and optimization of interplay between functional components of the whole system. A set of tools deployed at GridKa, including Puppet, Redmine, Foreman, SVN and Icinga, provides the administrative environment giving the possibility to define and develop configuration workflows, reduce the administrative effort and improve sustainable operation of the whole computing center. In this presentation we discuss the developed configuration scenarios implemented at GridKa, which we use for host installation, service deployment, change management procedures, service retirement etc. The integration of Puppet with a project management tool like Redmine provides us with the opportunity to track problem issues, organize tasks and automate these workflows. The interaction between Puppet and Redmine results in automatic updates of the issues related to the executed workflow performed by different system components. The extensive configuration workflows require collaboration and interaction between different departments like network, security, production etc. at GridKa. Redmine plugins developed at GridKa and integrated in its administrative environment provide an effective way of collaboration within the GridKa team. We present the structural overview of the software components, their connections, communication protocols and show a few working examples of the workflows and their automation.

  6. DBMS as a Tool for Project Management

    NASA Technical Reports Server (NTRS)

    Linder, H.

    1984-01-01

    Scientific objectives of crustal dynamics are listed as well as the contents of the centralized data information system for the crustal dynamics project. The system provides for project observation schedules, gives project configuration control information and project site information.

  7. A Statistical Project Control Tool for Engineering Managers

    NASA Technical Reports Server (NTRS)

    Bauch, Garland T.

    2001-01-01

    This slide presentation reviews the use of a Statistical Project Control Tool (SPCT) for managing engineering projects. A literature review pointed to a definition of project success, (i.e., A project is successful when the cost, schedule, technical performance, and quality satisfy the customer.) The literature review also pointed to project success factors, and traditional project control tools, and performance measures that are detailed in the report. The essential problem is that with resources becoming more limited, and an increasing number or projects, project failure is increasing, there is a limitation of existing methods and systematic methods are required. The objective of the work is to provide a new statistical project control tool for project managers. Graphs using the SPCT method plotting results of 3 successful projects and 3 failed projects are reviewed, with success and failure being defined by the owner.

  8. Issues in NASA Program and Project Management. Special Report: 1997 Conference. Project Management Now and in the New Millennium

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics Considered Include: NASA's Shared Experiences Program; Core Issues for the Future of the Agency; National Space Policy Strategic Management; ISO 9000 and NASA; New Acquisition Initiatives; Full Cost Initiative; PM Career Development; PM Project Database; NASA Fast Track Studies; Fast Track Projects; Earned Value Concept; Value-Added Metrics; Saturn Corporation Lessons Learned; Project Manager Credibility.

  9. The Expert Project Management System (EPMS)

    NASA Technical Reports Server (NTRS)

    Silverman, Barry G.; Diakite, Coty

    1986-01-01

    Successful project managers (PMs) have been shown to rely on 'intuition,' experience, and analogical reasoning heuristics. For new PMs to be trained and experienced PMs to avoid repeating others' mistakes, it is necessary to make the knowledge and heuristics of successful PMs more widely available. The preparers have evolved a model of PM thought processes over the last decade that is now ready to be implemented as a generic PM aid. This aid consists of a series of 'specialist' expert systems (CRITIC, LIBRARIAN, IDEA MAN, CRAFTSMAN, and WRITER) that communicate with each other via a 'blackboard' architecture. The various specialist expert systems are driven to support PM training and problem solving since any 'answers' they pass to the blackboard are subjected to conflict identification (AGENDA FORMULATOR) and GOAL SETTER inference engines.

  10. Project Management Framework to Organizational Transitions

    NASA Technical Reports Server (NTRS)

    Kotnour, Tim; Barton, Saul

    1996-01-01

    This paper describes a project management framework and associated models for organizational transitions. The framework contains an integrated set of steps an organization can take to lead an organizational transition such as downsizing and change in mission or role. The framework is designed to help an organization do the right work the right way with the right people at the right time. The underlying rationale for the steps in the framework is based on a set of findings which include: defining a transition as containing both near-term and long-term actions, designing actions which respond to drivers and achieve desired results, aligning the organization with the external environment, and aligning the internal components of the organization. The framework was developed based on best practices found in the literature, lessons learned from heads of organizations who have completed large-scale organizational changes, and concerns from employees at the Kennedy Space Center (KSC). The framework is described using KSC.

  11. Business Graduates and Management Jobs: An Employability Match Made in Heaven?

    ERIC Educational Resources Information Center

    Wilton, Nick

    2008-01-01

    The rapid growth in undergraduate business education over the last three decades has coincided with the growing dominance of an economic ideology of higher education (HE); that its role is principally one of contributing to national competitiveness through the development of graduate "employability". In particular, undergraduate business…

  12. Marketing Climate: New Considerations for Target Marketing in Graduate Student Enrollment Management

    ERIC Educational Resources Information Center

    Kranzow, Jeannine; Hyland, Nancy

    2011-01-01

    Lewison and Hawes (1997) discuss target marketing strategies of differentiated, concentrated or orchestrated marketing in their article "Student Marketing Strategies for Universities." While the authors agree with some of the suggested strategies and reasons behind them, their perspective as faculty teaching in a graduate education program offers…

  13. Gaining Confidence, Managing Conflict: Early Career Conceptions of Teacher Leadership during Graduate Coursework

    ERIC Educational Resources Information Center

    Carver, Cynthia L.; Meier, Jeanne M.

    2013-01-01

    Increasingly, graduate programs in education are promoting the development of teacher leadership. Yet the discussion on how to prepare teachers for leadership roles and responsibilities is only beginning. In this article, we draw on the written reflections of early career teachers enrolled in a curriculum and instruction master's program so that…

  14. Managing Communication and Professional Development in Online Graduate Programs with Electronic Portfolios

    ERIC Educational Resources Information Center

    Shepherd, Craig E.; Bolliger, Doris U.

    2014-01-01

    Four years ago, two online graduate programs at a mid-size university in the western United States implemented ePortfolios to foster communication and connectedness among students and faculty, develop community that extends beyond course boundaries, and promote professional goal formation and achievement among students. This article describes…

  15. Innovation in Health Policy Education: Project-Based Service Learning at a Distance for Graduate Midwifery Students.

    PubMed

    Van Hoover, Cheri

    2015-01-01

    Core competencies for midwifery practice include an understanding of systems of health care delivery and advocacy for legislation and policy initiatives that promote quality in health care. Today's rapidly changing health care environment, due in part to the implementation of the Patient Protection and Affordable Care Act, mandates that midwives possess greater literacy in health policy and comfort with political action than ever before. Frequently disinterested in politics and intimidated by the policymaking process, student midwives lack the foundational knowledge and practical skills needed to meet this professional obligation. The Midwifery Institute of Philadelphia University graduate program educates both student nurse-midwives and student midwives in health policy using an innovative, project-based service-learning approach featuring real-world collaborative experiences. This novel teaching style is ideally suited for instruction at a distance because of the diversity of experience brought to the virtual classroom by students in widely disparate geopolitical locations. As students accomplish measurable objectives within their individually developed projects and reflect with classmates about their experiences, they feel empowered to effect change and report lower perceived barriers to future political engagement.

  16. Even the best laid plans sometimes go askew: career self-management processes, career shocks, and the decision to pursue graduate education.

    PubMed

    Seibert, Scott E; Kraimer, Maria L; Holtom, Brooks C; Pierotti, Abigail J

    2013-01-01

    Drawing on career self-management frameworks as well as image theory and the unfolding model of turnover, we developed a model predicting early career employees' decisions to pursue graduate education. Using a sample of 337 alumni from 2 universities, we found that early career individuals with intrinsic career goals, who engaged in career planning, who were less satisfied with their career, or who experienced impactful positive career shocks were more likely to intend to go to graduate school. In contrast, individuals with extrinsic career goals who were highly satisfied with their careers were less likely to intend to go to graduate school. Graduate education intentions, career planning, and the impact of having one's mentor leave the organization positively related to actual applications to graduate school. However, having extrinsic career goals, an impactful sooner than expected raise or promotion (a positive career shock), and a negative organizational change (a negative career shock) negatively related to the likelihood of applying. The career shocks' direct relationship to applications to graduate school, regardless of one's intentions, suggests that "the best laid plans" can sometimes be altered by unplanned events. This study contributes to the literatures on career self-management and graduate education and extends the application of the shock construct from the unfolding model of turnover to other career-related decisions.

  17. The Student Team Project: A Long-Term Cooperative Strategy in Graduate Environmental Studies.

    ERIC Educational Resources Information Center

    Sherman, Lawrence W.; Woy-Hazleton, Sandra

    A year-long, cooperatively structured, student team strategy is described that is being used as a major component in an interdisciplinary Master of Environmental Science degree program. The general philosophy of the degree program and the rationale for including the Student Team Project (STP) are described. The most basic goal of the program is…

  18. ISS Update: SPHERES with Telerobotics Project Manager Terry Fong

    NASA Video Gallery

    NASA Public Affairs Officer Brandi Dean talks with Terry Fong, Telerobotics Project Manager, about how the Synchronized Position, Hold, Engage and Reorient Experimental Satellites, or SPHERES, are ...

  19. Fostering Systems Engineering Education Through Interdisciplinary Programs and Graduate Capstone Projects

    DTIC Science & Technology

    2011-06-01

    and continuous learning opportunities for DoD personnel. Information can be found at http://www.dau.mil/default.aspx . 3. Bloom B. S ., Taxonomy of...for Learning, Teaching and Assessing: a Revision of Bloom’s Taxonomy of Educational Objectives. Longman, New York, 1956. 5. Information regarding...PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) Air

  20. [Dream Team--a pre-graduate surgical talent development project].

    PubMed

    Jensen, Rune Dall; Christensen, Mette Krogh; Seyer-Hansen, Mikkel

    2014-08-04

    In 2009 surgeons from Aarhus University Hospital founded an extracurricular talent development project based on a skill-acquisition training programme for medical students at Aarhus University. The training program, named Dream Team, provides medical students with the opportunity to pursue a career in surgery. This paper presents and discusses the organizational and pedagogical framework of the concept Dream Team, as well as the results from two inquiries: a survey and an exploratory observational study. The inquiries were conducted in summer 2013.

  1. Relationship between time management in construction industry and project management performance

    NASA Astrophysics Data System (ADS)

    Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin

    2016-08-01

    Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.

  2. USAF/SCEEE Graduate Student Summer Research Program (1984). Program Management Report.

    DTIC Science & Technology

    1984-10-01

    adjunct effort to the SFRP. Its purpose is to provide funds for selected graduate students to do research at an appropriate Air Force laboratory or...under the Summer Faculty Research Program or an Air Force laboratory designated *- colleague. The students were U.S. citizens, working toward . an...faculty member; excellent laboratory experience. Good opportunity to become acquainted with Air Force research . Good concept. Good stipend

  3. Integrated Risk Management Within NASA Programs/Projects

    NASA Technical Reports Server (NTRS)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the

  4. Graduate Management Admission Test Outcomes and the Academic Achievement: A Study on Masters of Business Administration Students at Makerere University, Uganda

    ERIC Educational Resources Information Center

    Wamala, Robert; Kizito, Saint Omala; Kakumba, Umar

    2012-01-01

    This study investigates whether the outcomes of the Graduate Management Admission Test (GMAT) can predict the academic achievement of enrollees in masters programs. The study is based on administrative data of 516 Masters of Business Administration (MBA) enrollees at the College of Business and Management Science, Makerere University in the 2011…

  5. Report: EPA Managers Did Not Hold Supervisors and Project Officers Accountable for Grants Management

    EPA Pesticide Factsheets

    Report #2005-P-00027, September 27, 2005. Managers did not sufficiently hold supervisors and project officers accountable for grants management because there is no process to measure most grants management activity.

  6. Assessing the Relationship between Ethical Project Management and Information Technology Project Success

    ERIC Educational Resources Information Center

    Howell, Byron Winter

    2010-01-01

    The purpose of this quantitative study was to assess the relationship between ethical project management and information technology (IT) project success. The success of IT projects is important for organizational success, but the rate of IT projects is historically low, costing billions of dollars annually. Using four key ethical variables…

  7. 76 FR 69700 - Klamath National Forest; California; Pumice Vegetation Management Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-09

    ... Forest Service Klamath National Forest; California; Pumice Vegetation Management Project AGENCY: Forest... the environmental effects of implementing the Pumice Vegetation Management project. The project is... Haupt, Pumice Vegetation Management Project Team Leader, Goosenest Ranger District, 37805 Highway...

  8. Program/Project Management Resources: A collection of 50 bibliographies focusing on continual improvement, reinventing government, and successful project management

    NASA Technical Reports Server (NTRS)

    Michaels, Jeffrey

    1994-01-01

    These Program/Project Management Resource Lists were originally written for the NASA project management community. Their purpose was to promote the use of the NASA Headquarters Library Program/Project Management Collection funded by NASA Headquarters Code FT, Training & Development Division, by offering introductions to the management topics studied by today's managers. Lists were also written at the request of NASA Headquarters Code T, Office of Continual improvements, and at the request of NASA members of the National Performance Review. This is the second edition of the compilation of these bibliographies; the first edition was printed in March 1994.

  9. Engineering Design Education Program for Graduate School

    NASA Astrophysics Data System (ADS)

    Ohbuchi, Yoshifumi; Iida, Haruhiko

    The new educational methods of engineering design have attempted to improve mechanical engineering education for graduate students in a way of the collaboration in education of engineer and designer. The education program is based on the lecture and practical exercises concerning the product design, and has engineering themes and design process themes, i.e. project management, QFD, TRIZ, robust design (Taguchi method) , ergonomics, usability, marketing, conception etc. At final exercise, all students were able to design new product related to their own research theme by applying learned knowledge and techniques. By the method of engineering design education, we have confirmed that graduate students are able to experience technological and creative interest.

  10. Fast Flux Test Facility, Sodium Storage Facility project-specific project management plan

    SciTech Connect

    Shank, D.R.

    1994-12-29

    This Project-Specific Project Management Plan describes the project management methods and controls used by the WHC Projects Department to manage Project 03-F-031. The Sodium Storage Facility provides for storage of the 260,000 gallons of sodium presently in the FFTF Plant. The facility will accept the molten sodium transferred from the FFTF sodium systems, and store the sodium in a solid state under an inert cover gas until such time as a Sodium Reaction Facility is available for final disposal of the sodium.

  11. Instructional Design and Project Management: Complementary or Divergent?

    ERIC Educational Resources Information Center

    van Rooij, Shahron Williams

    2011-01-01

    This paper reports the results of a study to identify the extent to which organizations that develop educational/training products are committed to project management, as measured by their project management implementation maturity, as a methodology that is separate and distinct from the processes of instructional design. A Web survey was…

  12. IPMA Standard Competence Scope in Project Management Education

    ERIC Educational Resources Information Center

    Bartoška, Jan; Flégl, Martin; Jarkovská, Martina

    2012-01-01

    The authors of the paper endeavoured to find out key competences in IPMA standard for educational approaches in project management. These key competences may be used as a basis for project management university courses. An incidence matrix was set up, containing relations between IPMA competences described in IPMA competence baseline. Further,…

  13. Management Workshop for Alcohol Safety Action Project: Instructor's Guide.

    ERIC Educational Resources Information Center

    Human Resources Research Organization, Alexandria, VA.

    The instructor's guide is part of a series designed to help project directors in the management of Alcohol Safety Action Projects (ASAP) through management workshops. Workshops will discuss certain phases of the ASAP including National Highway Traffic Safety Administration (NHTSA) organizational and supportive efforts, countermeasures,…

  14. Recommendations for improvements to program and project management

    SciTech Connect

    Not Available

    1994-01-01

    Oak Ridge National Laboratory (ORNL) has operated with a balanced matrix organization for over sixteen years. Much of the work at the Laboratory is accomplished with good customer satisfaction through programs, projects, and matrix management. During the past several years concerns about program and project management at ORNL have been expressed by both the Department of Energy and ORNL staff. In May 1993 the ORNL Division/Program/Office Directors Caucus chartered a ``fox team`` to identity and to recommend improvements to matrix management that would lead to resolution of these concerns. Nine experienced ORNL staff members served on this Matrix Management Upgrade Solutions Team (MMUST). The MMUST adopted a four-phase approach in which they first gathered information and then developed and proposed recommended actions. In the fourth phase the team was available to support implementation of the recommendations. They began work in June 1993, gathering and evaluating information in biweekly meetings for six months. Recommendations developed in October and November 1993 were presented to ORNL management in December. The MMUST issued three principal recommendations based on their evaluation of the information gathered. They are: Renew and enhance the ORNL management commitment to matrix management, program managers, and project managers; Implement actions to ensure career path parity between the program/project manager family of positions and the technical line manager family of positions across all directorates and divisions; and Clarify and document program/project manager roles, responsibilities, and authorities.

  15. Requirements management: keeping your technology acquisition project under control.

    PubMed

    Carr, J J

    2000-03-01

    Whether you are acquiring clinical or business information systems, patient monitoring systems, or therapeutic and diagnostic systems, the odds are good that the project will be delivered late, will cost far more than predicted, and will not provide all the features promised. The principal reason for project failure is improper management of the requirements of the system. Requirements engineering and management is a skill from the systems engineering profession that can be learned by nearly any professional who is managing a technology acquisition project. The author discusses what requirements engineering and management is and how it is done.

  16. Proceedings of Management Workshop for Alcohol Safety Action Project Leaders.

    ERIC Educational Resources Information Center

    Human Resources Research Organization, Alexandria, VA.

    The workshop for Alcohol Safety Action Project administrators was held to help prepare project directors in the management of their projects and to identify their responsibilities and job tasks. It was also attended by National Highway Traffic Safety Administration (NHTSA) representatives to help in the orientation of the ASAP program. The full…

  17. Choosing and Developing the Right Leadership Styles for Projects

    NASA Technical Reports Server (NTRS)

    Mueller, Ralf

    2008-01-01

    Analyzing extensive questionnaires completed by 400 project management professionals, Professor Rodney Turner of the Lille Graduate School of Management and I have identified competencies that contribute significantly to project management success. Our research helps define the managerial and emotional competencies needed to make projects work. We also found that different kinds of projects call for different combinations of competencies.

  18. A success paradigm for project managers in the aerospace industry

    NASA Astrophysics Data System (ADS)

    Bauer, Barry Jon

    Within the aerospace industry, project managers traditionally have been selected based on their technical competency. While this may lead to brilliant technical solutions to customer requirements, a lack of management ability can result in failed programs that over-run on cost, are late to critical path schedules, fail to fully utilize the diversity of talent available within the program team, and otherwise disappoint key stakeholders. This research study identifies the key competencies that a project manager should possess in order to successfully lead and manage a project in the aerospace industry. The research attempts to show evidence that within the aerospace industry, it is perceived that management competency is more important to project management success than only technical competence.

  19. Researchers' experience with project management in health and medical research: Results from a post-project review

    PubMed Central

    2011-01-01

    Background Project management is widely used to deliver projects on time, within budget and of defined quality. However, there is little published information describing its use in managing health and medical research projects. We used project management in the Alcohol and Pregnancy Project (2006-2008) http://www.ichr.uwa.edu.au/alcoholandpregnancy and in this paper report researchers' opinions on project management and whether it made a difference to the project. Methods A national interdisciplinary group of 20 researchers, one of whom was the project manager, formed the Steering Committee for the project. We used project management to ensure project outputs and outcomes were achieved and all aspects of the project were planned, implemented, monitored and controlled. Sixteen of the researchers were asked to complete a self administered questionnaire for a post-project review. Results The project was delivered according to the project protocol within the allocated budget and time frame. Fifteen researchers (93.8%) completed a questionnaire. They reported that project management increased the effectiveness of the project, communication, teamwork, and application of the interdisciplinary group of researchers' expertise. They would recommend this type of project management for future projects. Conclusions Our post-project review showed that researchers comprehensively endorsed project management in the Alcohol and Pregnancy Project and agreed that project management had contributed substantially to the research. In future, we will project manage new projects and conduct post-project reviews. The results will be used to encourage continuous learning and continuous improvement of project management, and provide greater transparency and accountability of health and medical research. The use of project management can benefit both management and scientific outcomes of health and medical research projects. PMID:21635721

  20. Managing Challenges in a Multi Contractor Project

    NASA Technical Reports Server (NTRS)

    King, Ron

    2011-01-01

    The presentation provides a project description, describes the integrated product team, and review project challenges. The challenges include programmatic, technical, basic drop tests, heavy drop tests, C-17 envelope expansion, and Ares I-X.

  1. The seven habits of highly effective project managers

    NASA Astrophysics Data System (ADS)

    Warner, Mark; Summers, Richard

    2016-08-01

    Why do some astronomy projects succeed, while others fail? There are obviously many different factors that can and do influence the outcome of any given project, but one of the most prevalent characteristics among successful projects is the combined skills and qualifications of the project manager (PM) at their helms. But this begs an obvious question: what exactly makes a project manager "skilled and qualified?" Asked another way, are there common traits, philosophies, and/or techniques that the most successful PMs share, and if so, what are they? The short answer is yes, the majority successful engineering project managers have significant skills, habits, and character traits in common. The longer answer is there are at least seven of these key traits, or "habits" that many successful PMs share and, more importantly, implement within their respective projects. This paper presents these key factors, including thoughts on scope and quality management, cost and schedule control, project team structures, risk management strategies, stakeholder management, and general project execution.

  2. Astronomical large projects managed with MANATEE: management tool for effective engineering

    NASA Astrophysics Data System (ADS)

    García-Vargas, M. L.; Mujica-Alvarez, E.; Pérez-Calpena, A.

    2012-09-01

    This paper describes MANATEE, which is the Management project web tool developed by FRACTAL, specifically designed for managing large astronomical projects. MANATEE facilitates the management by providing an overall view of the project and the capabilities to control the three main projects parameters: scope, schedule and budget. MANATEE is one of the three tools of the FRACTAL System & Project Suite, which is composed also by GECO (System Engineering Tool) and DOCMA (Documentation Management Tool). These tools are especially suited for those Consortia and teams collaborating in a multi-discipline, complex project in a geographically distributed environment. Our Management view has been applied successfully in several projects and currently is being used for Managing MEGARA, the next instrument for the GTC 10m telescope.

  3. Measurement of Software Project Management Effectiveness

    DTIC Science & Technology

    2008-12-01

    the research hypothesis. In order to understand the measure of association between these two metrics, a parametric correlation analysis was conducted...Data Analysis of Risk Area Scores In order to understand the measure of association between project success ratings provided by the study...required including projects developed in other parts of the world. The studies included projects from both public and private

  4. Experiences and Lessons Learned in Project Risk Management

    DTIC Science & Technology

    1983-07-15

    proceeds. A major task in project risk management is to assure that the ex- pected value of the projected outcome area does not materially deviate...Description of the bidder’s risk management plan covering cost, scheduling, and technical risks, together with the details of procedures and system for...Implementing the risk management plan. 4. As part of the bid evaluation, the government should compare the bidder’s risk analysis results with the

  5. Application of expert systems in project management decision aiding

    NASA Technical Reports Server (NTRS)

    Harris, Regina; Shaffer, Steven; Stokes, James; Goldstein, David

    1987-01-01

    The feasibility of developing an expert systems-based project management decision aid to enhance the performance of NASA project managers was assessed. The research effort included extensive literature reviews in the areas of project management, project management decision aiding, expert systems technology, and human-computer interface engineering. Literature reviews were augmented by focused interviews with NASA managers. Time estimation for project scheduling was identified as the target activity for decision augmentation, and a design was developed for an Integrated NASA System for Intelligent Time Estimation (INSITE). The proposed INSITE design was judged feasible with a low level of risk. A partial proof-of-concept experiment was performed and was successful. Specific conclusions drawn from the research and analyses are included. The INSITE concept is potentially applicable in any management sphere, commercial or government, where time estimation is required for project scheduling. As project scheduling is a nearly universal management activity, the range of possibilities is considerable. The INSITE concept also holds potential for enhancing other management tasks, especially in areas such as cost estimation, where estimation-by-analogy is already a proven method.

  6. Project Management of Randomized Clinical Trials: A Narrative Review

    PubMed Central

    Goodarzynejad, Hamidreza; Babamahmoodi, Abdolreza

    2015-01-01

    Context: A well-structured protocol for a clinical trial may be able to answer clinical questions, but it cannot be deemed enough to ensure success in the face of incompetent management of time as well as human and economic resources. To address this problem, in this article, we present our literature review on evidence as to how a good knowledge of proper management among researchers can enhance the likelihood of the success of clinical trial projects. Evidence Acquisition: Using multiple search strategies, we conducted a literature review on published studies in the English language from 2002 to 2012 by searching the Cochrane Database of Systematic Reviews, MEDLINE, Google Scholar, and EMBASE. Results: Our review suggests that a successful trial requires a work plan or work scope as well as a timeline. The trial manager should subsequently manage the study in accordance with the plan and the timeline. Many research units have called for a clinical project manager with scientific background and regulatory skills to effect coordination among various aspects of a clinical trial. Conclusions: Project management may benefit both the managerial and scientific aspects of medical projects and reduce fund waste. However, little has been written to date on project management in the context of clinical research. The suggestions represent the views of the individual authors. To provide a high level of evidence in this regard, we recommend that a randomized controlled trial be performed to compare trial projects progressed with and without the use of project management. PMID:26430517

  7. Systems Engineering Management Plan. Volume 5 of the MRS Project Management Plan

    SciTech Connect

    Not Available

    1994-01-01

    The purpose of this Monitored Retrievable Storage (MRS) Project Systems Engineering Management Plan (SEMP) is to define and establish the MRS Project Systems Engineering process that implements the approved policy and requirements of the Office of Civilian Radioactive Waste Management (OCRWM) for the US Department of Energy (DOE). This plan is Volume 5 of the MRS Project Management Plan (PMP). This plan provides the framework for implementation of systems engineering on the MRS Project consistent with DOE Order 4700.1, the OCRWM Program Management System Manual (PMSM), and the OCRWM Systems Engineering Management Plan (SEMP).

  8. Managing Small Spacecraft Projects: Less is Not Easier

    NASA Technical Reports Server (NTRS)

    Barley, Bryan; Newhouse, Marilyn

    2012-01-01

    Managing small, low cost missions (class C or D) is not necessarily easier than managing a full flagship mission. Yet, small missions are typically considered easier to manage and used as a training ground for developing the next generation of project managers. While limited resources can be a problem for small missions, in reality most of the issues inherent in managing small projects are not the direct result of limited resources. Instead, problems encountered by managers of small spacecraft missions often derive from 1) the perception that managing small projects is easier if something is easier it needs less rigor and formality in execution, 2) the perception that limited resources necessitate or validate omitting standard management practices, 3) less stringent or unclear guidelines or policies for small projects, and 4) stakeholder expectations that are not consistent with the size and nature of the project. For example, the size of a project is sometimes used to justify not building a full, detailed integrated master schedule. However, while a small schedule slip may not be a problem for a large mission, it can indicate a serious problem for a small mission with a short development phase, highlighting the importance of the schedule for early identification of potential issues. Likewise, stakeholders may accept a higher risk posture early in the definition of a low-cost mission, but as launch approaches this acceptance may change. This presentation discusses these common misconceptions about managing small, low cost missions, the problems that can result, and possible solutions.

  9. Management of major offshore projects - an industry challenge

    SciTech Connect

    Vicklund, C.A.; Craft, W.S.

    1981-04-01

    Faced with the urgency to create new energy supplies and the increasing complexity and size of offshore projects, industry's objective and challenge must be the timely development and efficient use of manpower, equipment, and other resources required to bring new production onstream. This study reviews project execution planning and organization and project management policies and practices. Competitive bidding, preference for fixed-price contracts, ethical conduct, and fairness doctrine are cited. Suggested steps during project execution are presented. 3 refs.

  10. The Flight of the Phoenix: Interpersonal Aspects of Project Management

    ERIC Educational Resources Information Center

    Huffman, Brian J.; Kilian, Claire McCarty

    2012-01-01

    Although many classroom exercises use movies to focus on management and organizational behavior issues, none of those do so in the context of project management. This article presents such an exercise using "The Flight of the Phoenix", an incredibly rich story for any management class, which provides clear examples of organizational behavior…

  11. Iraq Reconstruction: Lessons in Program and Project Management

    DTIC Science & Technology

    2007-03-01

    IRAQ RECONSTRUCTION I 1 • Corps of Engineers Financial Management System (CEFMS) • Primavera P3 (Project Management)—commercial software for planning...updated and analyzed at least monthly. • Sector program managers would be responsible for performing EVM, using the Primavera software, and

  12. Non-Profit/Higher Education Project Management Series: The Project Plan

    ERIC Educational Resources Information Center

    Burgher, Karl E.; Snyder, Michael

    2012-01-01

    This is the second installment of the AACRAO management series focusing on project management in the academy. In this article, the authors focus on white papers (often called charters, briefs, or fact sheets) and their partner, the work plan. The work plan is a detailed document that defines each aspect of a project. It is often preceded by a…

  13. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  14. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  15. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall...

  16. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  17. Planning "and" Sprinting: Use of a Hybrid Project Management Methodology within a CIS Capstone Course

    ERIC Educational Resources Information Center

    Baird, Aaron; Riggins, Frederick J.

    2012-01-01

    An increasing number of information systems projects in industry are managed using hybrid project management methodologies, but this shift in project management methods is not fully represented in our CIS curriculums. CIS capstone courses often include an applied project that is managed with traditional project management methods (plan first,…

  18. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  19. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall...

  20. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan...

  1. Servant leadership behaviors of aerospace and defense project managers and their relation to project success

    NASA Astrophysics Data System (ADS)

    Dominik, Michael T.

    The success of a project is dependent in part on the skills, knowledge, and behavior of its leader, the project manager. Despite advances in project manager certifications and professional development, the aerospace and defense industry has continued to see highly visible and expensive project failures partially attributable to failures in leadership. Servant leadership is an emerging leadership theory whose practitioners embrace empowerment, authenticity, humility, accountability, forgiveness, courage, standing back, and stewardship, but has not yet been fully examined in the context of the project manager as leader. The objective of this study was to examine the relationship between servant leadership behaviors demonstrated by aerospace and defense project managers and the resulting success of their projects. Study participants were drawn from aerospace and defense oriented affinity groups from the LinkedInRTM social media web system. The participants rated their project managers using a 30-item servant leadership scale, and rated the success of their project using a 12-item project success scale. One hundred and fifteen valid responses were analyzed from 231 collected samples from persons who had worked for a project manager on an aerospace and defense project within the past year. The results of the study demonstrated statistically significant levels of positive correlation to project success for all eight servant leadership factors independently evaluated. Using multiple linear regression methods, the servant leadership factors of empowerment and authenticity were determined to be substantial and statistically significant predictors of project success. The study results established the potential application of servant leadership as a valid approach for improving outcomes of projects.

  2. SSME Advanced Health Management: Project Overview

    NASA Technical Reports Server (NTRS)

    Plowden, John

    2000-01-01

    This document is the viewgraphs from a presentation concerning the development of the Health Management system for the Space Shuttle Main Engine (SSME). It reviews the historical background of the SSME Advanced Health Management effort through the present final Health management configuration. The document includes reviews of three subsystems to the Advanced Health Management System: (1) the Real-Time Vibration Monitor System, (2) the Linear Engine Model, and (3) the Optical Plume Anomaly Detection system.

  3. Multiple Case Study of Event Management Curricula and Industry Professionals' Expectations of New Graduates

    ERIC Educational Resources Information Center

    Whitney, Premila A.

    2016-01-01

    The event management segment of the hospitality industry has experienced tremendous growth in recent years. As a result, demand for qualified event management professionals continues to increase. To help prepare qualified professionals for the event management industry, higher education institutions in the United States are now offering…

  4. Accelerated Management Development

    ERIC Educational Resources Information Center

    Munn, Kenn

    1974-01-01

    Western Electric's accelerated management development program for hand picked college graduate students consists of a high risk training project in which the management candidate accomplishes his task or is terminated. The success of such projects puts candidates in third level management in seven years or half the normal time. (DS)

  5. Managing Best Practice Research Scholarship Projects.

    ERIC Educational Resources Information Center

    Dawes, Nick

    2002-01-01

    Describes the Best Practice Research Scholarship (BPRS) project designed for teachers which supports development of formative assessment strategies. Uses mentors to provide guidance to teacher research groups. (YDS)

  6. The Role of the Project Management Office on Information Technology Project Success

    ERIC Educational Resources Information Center

    Stewart, Jacob S.

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. Assessing critical success factors is another…

  7. Spiral and Project-Based Learning with Peer Assessment in a Computer Science Project Management Course

    ERIC Educational Resources Information Center

    Jaime, Arturo; Blanco, José Miguel; Domínguez, César; Sánchez, Ana; Heras, Jónathan; Usandizaga, Imanol

    2016-01-01

    Different learning methods such as project-based learning, spiral learning and peer assessment have been implemented in science disciplines with different outcomes. This paper presents a proposal for a project management course in the context of a computer science degree. Our proposal combines three well-known methods: project-based learning,…

  8. Health Project Management. A Manual of Procedures for Formulating and Implementing Health Projects.

    ERIC Educational Resources Information Center

    Bainbridge, J.; Sapirie, S.

    The manual presents 16 main steps for health project management, from project formulation through termination. The manual defines a health project as a temporary intensive effort to set up and put into operation a new or revised service that will result in the reduction of specific health or health-related problems. (Typical examples include the…

  9. FME Senior Project Managers: A Juggling Act of Multiple Projects | Poster

    Cancer.gov

    By Peggy Pearl, Contributing Writer It was not until the 1950s that organizations in the United States began to apply project management tools and techniques to complex construction and engineering projects (http://en.m.wikipedia.org/wiki/Project_life_cycle).

  10. We Scrum Every Day: Using Scrum Project Management Framework for Group Projects

    ERIC Educational Resources Information Center

    Pope-Ruark, Rebecca

    2012-01-01

    Collaborative group projects have documented learning benefits, yet collaboration is challenging for students because the educational system values individual achievement. This article explores Scrum, an approach to framing, planning, and managing group projects used in Web-software development. Designed for multi-faceted projects, this approach…

  11. K-12 Project Management Education: NASA Hunch Projects

    ERIC Educational Resources Information Center

    Morgan, Joe; Zhan, Wei; Leonard, Matt

    2013-01-01

    To increase the interest in science, technology, engineering, and math (STEM) among high school students, the National Aeronautics and Space Administration (NASA) created the "High Schools United with NASA to Create Hardware" (HUNCH) program. To enhance the experience of the students, NASA sponsored two additional projects that require…

  12. What research project management in Earth sciences really means

    NASA Astrophysics Data System (ADS)

    Cristini, Luisa; Lampitt, Richard; Alexiou, Sofia

    2015-04-01

    Since much earlier than at the start of a research project, principal investigators and project coordinators have responsibilities that go far beyond their scientific interests. Management and communication skills are essential to build those working relationships that will result in a successful proposal as well as to disseminate project outputs to the funding agencies and the public sector. Starting from the cases of the FixO3 project and the previous EuroSITES, two EU-funded collaborative projects in observational oceanography, we show practical examples of typical management issues in research projects from the initial phase of outlining and submitting a proposal to the project implementation and reporting of the results.

  13. Graduation: 1976.

    ERIC Educational Resources Information Center

    George Washington Univ., Washington, DC. Inst. for Educational Leadership.

    The program is a series of interviews and montages on the topic of graduation at all levels: high school, college, graduate, and honorary degrees. Among those interviewed are: Caroline Bird, author of "The Case Against College"; Judith Harrison, Maureen Smith, and Frank Meta, graduates; Roy Forbes, Director of the National Assessment of…

  14. Climate Change Risk Management: CRE Adaptation Projects and the Risk Management Process

    EPA Pesticide Factsheets

    This document describes National Estuary Program partner projects that demonstrate how risk management can be successfully applied to address environmental challenges in our country’s coastal areas.

  15. 78 FR 8544 - Training Program for Regulatory Project Managers; Information Available to Industry

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-06

    ... HUMAN SERVICES Food and Drug Administration Training Program for Regulatory Project Managers... training and development programs to promote high performance in its regulatory project management staff... its training program to give regulatory project managers the opportunity to tour...

  16. Even the Best Laid Plans Sometimes Go Askew: Career Self-Management Processes, Career Shocks, and the Decision to Pursue Graduate Education

    ERIC Educational Resources Information Center

    Seibert, Scott E.; Kraimer, Maria L.; Holtom, Brooks C.; Pierotti, Abigail J.

    2013-01-01

    Drawing on career self-management frameworks as well as image theory and the unfolding model of turnover, we developed a model predicting early career employees' decisions to pursue graduate education. Using a sample of 337 alumni from 2 universities, we found that early career individuals with intrinsic career goals, who engaged in career…

  17. NASA Space Flight Program and Project Management Handbook

    NASA Technical Reports Server (NTRS)

    Blythe, Michael P.; Saunders, Mark P.; Pye, David B.; Voss, Linda D.; Moreland, Robert J.; Symons, Kathleen E.; Bromley, Linda K.

    2014-01-01

    This handbook is a companion to NPR 7120.5E, NASA Space Flight Program and Project Management Requirements and supports the implementation of the requirements by which NASA formulates and implements space flight programs and projects. Its focus is on what the program or project manager needs to know to accomplish the mission, but it also contains guidance that enhances the understanding of the high-level procedural requirements. (See Appendix C for NPR 7120.5E requirements with rationale.) As such, it starts with the same basic concepts but provides context, rationale, guidance, and a greater depth of detail for the fundamental principles of program and project management. This handbook also explores some of the nuances and implications of applying the procedural requirements, for example, how the Agency Baseline Commitment agreement evolves over time as a program or project moves through its life cycle.

  18. Students Speak With Gary Cox, EPIC Project Manager

    NASA Video Gallery

    From NASA’s International Space Station Mission Control Center Gary Cox EPIC Project Manager, participates in a Digital Learning Network (DLN) event with students at South Effingham Middle School...

  19. Project Management Plan for the INEL technology logic diagrams

    SciTech Connect

    Rudin, M.J.

    1992-10-01

    This Project Management Plan (PjMP) describes the elements of project planning and control that apply to activities outlined in Technical Task Plan (TTP) ID-121117, ``Technology Logic Diagrams For The INEL.`` The work on this project will be conducted by personnel in EG&G Idaho, Inc.`s Waste Technology Development Program. Technology logic diagrams represent a formal methodology to identify technology gaps or needs within Environmental Restoration/Waste Management Operations, which will focus on Office of Environmental Restoration and Waste Management (EM-50) research and development, demonstration, test, and evaluation efforts throughout the US Department of Energy complex. This PjMP describes the objectives, organization, roles and responsibilities, workscope and processes for implementing and managing the technology logic diagram for the Idaho National Engineering Laboratory project.

  20. Project Management Plan for the INEL technology logic diagrams

    SciTech Connect

    Rudin, M.J.

    1992-10-01

    This Project Management Plan (PjMP) describes the elements of project planning and control that apply to activities outlined in Technical Task Plan (TTP) ID-121117, Technology Logic Diagrams For The INEL.'' The work on this project will be conducted by personnel in EG G Idaho, Inc.'s Waste Technology Development Program. Technology logic diagrams represent a formal methodology to identify technology gaps or needs within Environmental Restoration/Waste Management Operations, which will focus on Office of Environmental Restoration and Waste Management (EM-50) research and development, demonstration, test, and evaluation efforts throughout the US Department of Energy complex. This PjMP describes the objectives, organization, roles and responsibilities, workscope and processes for implementing and managing the technology logic diagram for the Idaho National Engineering Laboratory project.

  1. Students Speak With Vacuum Chamber Project Manager Mary Cerimele

    NASA Video Gallery

    From the International Space Station Flight Control Room at NASA's Johnson Space Center, Vacuum Chamber A Project Manager Mary Cerimele participates in a Digital Learning Network (DLN) event with s...

  2. Criticality accident alarm system at the Fernald Environmental Management Project

    SciTech Connect

    Marble, R.C.; Brown, T.D.; Wooldridge, J.C.

    1994-12-31

    This paper describes the staus of the Fernald Environmental Management Project (FEMP) criticality alarm system. A new radiation detection alarm system was installed in 1990. The anunciation system, calibration and maintenance, and detector placement is described.

  3. Financial Success for Young Adults and Recent Graduates: Managing Money, Credit, and Your Future

    ERIC Educational Resources Information Center

    Arrowood, Janet C.

    2006-01-01

    There are numerous financial planning and money management handbooks, but few focus on the needs of young adults between 16 and 25 years of age. Colleges and some high schools are increasingly offering courses covering money management, but the materials are more "economics-focused" than "real-world" focused. Young people are huge consumers who…

  4. Employers' Perceptions of Information Technology Competency Requirements for Management Accounting Graduates

    ERIC Educational Resources Information Center

    Spraakman, Gary; O'Grady, Winifred; Askarany, Davood; Akroyd, Chris

    2015-01-01

    Management accountants work in a computerized workplace with information technology (IT) for producing financial ledgers and for reporting. Thus, the role of the management accountant has shifted from capturing and recording transactions to analyzing business issues. The research question is: what IT knowledge and skills do employers require of…

  5. Person-Centered Management in Project Administration.

    ERIC Educational Resources Information Center

    Caraway, James E.

    The theories of several contemporary management theorists are examined in order to demonstrate that their administrative stance is that of a person-intensive approach to management. After exploring leadership theory and the positions of Douglas McGregor, John J. Morse, Jay W. Lorsch, Rensis Likert, Bernard M. Bass, William Reddin, George H. Rice,…

  6. Improving Project Management with Simulation and Completion Distribution Functions

    NASA Technical Reports Server (NTRS)

    Cates, Grant R.

    2004-01-01

    Despite the critical importance of project completion timeliness, management practices in place today remain inadequate for addressing the persistent problem of project completion tardiness. A major culprit in late projects is uncertainty, which most, if not all, projects are inherently subject to. This uncertainty resides in the estimates for activity durations, the occurrence of unplanned and unforeseen events, and the availability of critical resources. In response to this problem, this research developed a comprehensive simulation based methodology for conducting quantitative project completion time risk analysis. It is called the Project Assessment by Simulation Technique (PAST). This new tool enables project stakeholders to visualize uncertainty or risk, i.e. the likelihood of their project completing late and the magnitude of the lateness, by providing them with a completion time distribution function of their projects. Discrete event simulation is used within PAST to determine the completion distribution function for the project of interest. The simulation is populated with both deterministic and stochastic elements. The deterministic inputs include planned project activities, precedence requirements, and resource requirements. The stochastic inputs include activity duration growth distributions, probabilities for events that can impact the project, and other dynamic constraints that may be placed upon project activities and milestones. These stochastic inputs are based upon past data from similar projects. The time for an entity to complete the simulation network, subject to both the deterministic and stochastic factors, represents the time to complete the project. Repeating the simulation hundreds or thousands of times allows one to create the project completion distribution function. The Project Assessment by Simulation Technique was demonstrated to be effective for the on-going NASA project to assemble the International Space Station. Approximately $500

  7. Academic Mobility Projects Management: Challenges for Ukrainian Professional Education

    ERIC Educational Resources Information Center

    Zabolotna, Oksana

    2015-01-01

    The article is devoted to the academic mobility projects management on the example of Pavlo Tychyna Uman State Pedagogical University in the Erasmus Mundus Projects, namely, EMINENCE and EMINENCE II. It has been pointed out that modern university is a constantly developing system possessing a hidden potential for innovations. Thus, the…

  8. An Analytical Method for Measuring Competence in Project Management

    ERIC Educational Resources Information Center

    González-Marcos, Ana; Alba-Elías, Fernando; Ordieres-Meré, Joaquín

    2016-01-01

    The goal of this paper is to present a competence assessment method in project management that is based on participants' performance and value creation. It seeks to close an existing gap in competence assessment in higher education. The proposed method relies on information and communication technology (ICT) tools and combines Project Management…

  9. The New Project Design and Management Workshop Training Manual.

    ERIC Educational Resources Information Center

    Peace Corps, Washington, DC. Information Collection and Exchange Div.

    This training manual presents guidelines for planning and conducting a project design and management (PDM) workshop to teach Peace Corps volunteers to involve local community members in the process of using participatory analysis tools and planning and implementing projects meeting local desires and needs. The first six sections contain the…

  10. Improving Project Management Using Formal Models and Architectures

    NASA Technical Reports Server (NTRS)

    Kahn, Theodore; Sturken, Ian

    2011-01-01

    This talk discusses the advantages formal modeling and architecture brings to project management. These emerging technologies have both great potential and challenges for improving information available for decision-making. The presentation covers standards, tools and cultural issues needing consideration, and includes lessons learned from projects the presenters have worked on.

  11. Academic Librarians and Project Management: An International Study

    ERIC Educational Resources Information Center

    Serrano, Silvia Cobo; Avilés, Rosario Arquero

    2016-01-01

    Because information and documentation units in libraries have responsibility for an ever-increasing number of projects, this paper aims at analyzing the discipline of project management in library and information science (LIS) from a professional perspective. To that end, the researchers employed quantitative and qualitative methodology based on a…

  12. Implementation of an Intelligent Tutorial System for Socioenvironmental Management Projects

    ERIC Educational Resources Information Center

    Vera, Gil; Daniel, Víctor; Awad, Gabriel

    2015-01-01

    The agents responsible of execution of physical infrastructure projects of the Government of Antioquia must know the theories and concepts related to the socio-environmental management of physical infrastructure projects. In the absence of tools and the little information on the subject, it is necessary to build a m-learning tool to facilitate to…

  13. School Building Projects: Managing Insurance and Contracts during Construction

    ERIC Educational Resources Information Center

    Shands, Richard

    2011-01-01

    Managing the risks inherent in a building project presents a challenge and opportunities not often encountered in the ordinary affairs of a school district. A building project brings the district, its staff, and students, as well as the community, in close contact with architects and engineers and a number of contractors for a period of time often…

  14. Management and Development of the Western Resources Project

    SciTech Connect

    Terry Brown

    2009-03-09

    The purpose of this project was to manage the Western Resources Project, which included a comprehensive, basin-wide set of experiments investigating the impacts of coal bed methane (CBM; a.k.a. coal bed natural gas, CBNG) production on surface and groundwater in the Powder River Basin in Wyoming. This project included a number of participants including Apache Corporation, Conoco Phillips, Marathon, the Ucross Foundation, Stanford University, the University of Wyoming, Montana Bureau of Mines and Geology, and Western Research Institute.

  15. Approaches for Measuring the Management Effectiveness of Software Projects

    DTIC Science & Technology

    2008-04-01

    project management, they expressed the need for a theory that helps us to understand the conditions, constraints, and drivers leading to functional and... functionality of the product. In addition, they may even view a cancelled project as success due to the lessons learned and the challenge in the project...metric model for such measurement to guide the future researches. The model is shown below: 1 _ ( ) n i i i SPMEM Measurement function w m

  16. Getting Organized: A Pragmatic Tool for Writing Graduate Papers.

    ERIC Educational Resources Information Center

    Shields, Patricia M.

    2000-01-01

    Describes a successful workshop for graduate teaching assistants which focused on the "notebook method" of writing scholarly papers. This method transforms writing a paper into managing a project. The method is linked to the pragmatic theory of inquiry developed by Charles Sander Peirce and John Dewey. (DB)

  17. Linking Theory with Practice: Undergraduate Project Management with School-Age Children.

    ERIC Educational Resources Information Center

    Falkenberg, Loren; Russell, Randy; Ricker, Lynne

    2000-01-01

    Management students taught basic business concepts to sixth graders and managed business projects with them. The management students applied knowledge of marketing, human resources, and operations management and developed reflective learning skills through project reports and coaching sessions. (SK)

  18. The pattern of performance management of community service learning empowerment in improving the entrepreneurship on the graduation candidate of Vocational Technology Education Institution

    NASA Astrophysics Data System (ADS)

    Hadromi

    2017-03-01

    The purpose of this research is to evaluate the pattern of performance management of Community Service Empowerment Learning-Universitas Negeri Semarang in improving the entrepreneurship of the graduate candidate of Vocational Technology Education Institution. This evaluation research uses Context Evaluation, Input evaluation, Process evaluation and Product evaluation method (CIPP) to evaluate the performance management of Community Service of Empowerment Learning-Universitas Negeri Semarang. The location of research was in Kandri Subdistrict-Indonesia. The subject of research is the Kandri Subdistrict community, especially the groups of the youth, students, subdistrict organizers, community organization, and culinery and handicraft industry, as well as the students who join the program of Community Service of Empowerment Learning-Universitas Negeri Semarang. The object of research is the pattern of perfomance management of Community Service Empowerment Learning-Universitas Negeri Semarang in improving the entrepreneurship of the graduation candidate of Vocational Technology Education Institution. The research result shows the pattern of Community Service Empowerment Learning-Universitas Negeri Semarang is able to improve the enterpreneurship of graduate candidate of Vocational Technology Education Institution. The pattern of Community Service Empowerment Community-Universitas Negeri Semarang which is Education for Sustainable Development (ESD)in the field of education, training, and assistance continuously can grasp and develop competency and balance mindset of students including triple bottom line which mutually connectedamong the sectors of social, economic, cultural, and environment so that it can increase the entrerpreneurship on the graduates candidate of Vocational Technology Education Institution

  19. Project Portfolio Management for Academic Libraries: A Gentle Introduction

    ERIC Educational Resources Information Center

    Vinopal, Jennifer

    2012-01-01

    In highly dynamic, service-oriented environments like academic libraries, much staff time is spent on initiatives to implement new products and services to meet users' evolving needs. Yet even in an environment where a sound project management process is applied, if we're not properly planning, managing, and controlling the organization's work in…

  20. Underground Test Area Subproject Project Management Plan, Revision 1

    SciTech Connect

    1998-06-03

    This Project Management Plan (PMP) describes the manner in which the US Department of Energy Nevada Operations Office (DOE/NV) will manage the Underground Test Area (UGTA) Subproject at the Nevada Test Site (NTS). It provides the basic guidance for implementation and the organizational structure for meeting the UGTA objectives.

  1. Science operations management. [with Infrared Astronomy Satellite project

    NASA Technical Reports Server (NTRS)

    Squibb, G. F.

    1984-01-01

    The operation teams engaged in the IR Astronomical Satellite (IRAS) project included scientists from the IRAS International Science Team. The detailed involvement of these scientists in the design, testing, validation, and operations phases of the IRAS mission contributed to the success of this project. The Project Management Group spent a substantial amount of time discussing science-related issues, because science team coleaders were members from the outset. A single scientific point-of-contact for the Management Group enhanced the depth and continuity of agreement reached in decision-making.

  2. The Partnership between Project Management and Organizational Change: Integrating Change Management with Change Leadership

    ERIC Educational Resources Information Center

    Griffith-Cooper, Barber; King, Karyl

    2007-01-01

    The nature of project management is change. Even though all knowledge areas in the Project Management Body of Knowledge (PMBOK) are rooted in controlling change, none of these areas specifically addresses the human elements of change. There is a significant distinction between directly controlling change relative to the nonhuman aspects of a…

  3. The Characteristics of Project Managers: An Exploration of Complex Projects in the National Aeronautics and Space Administration

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.

    2000-01-01

    Study of characteristics and relationships of project managers of complex projects in the National Aeronautics and Space Administration. Study is based on Research Design, Data Collection, Interviews, Case Studies, and Data Analysis across varying disciplines such as biological research, space research, advanced aeronautical test facilities, aeronautic flight demonstrations, and projects at different NASA centers to ensure that findings were not endemic to one type of project management, or to one Center's management philosophies. Each project is treated as a separate case with the primary data collected during semi-structured interviews with the project manager responsible for the overall project. Results of the various efforts show some definite similarities of characteristics and relationships among the project managers in the study. A model for how the project managers formulated and managed their projects is included.

  4. Waste management for Shippingport Station Decommissioning Project: Extended summary

    SciTech Connect

    Mullee, G.R.; Schulmeister, A.R.

    1987-01-01

    The Shippingport Station (SSDP) is demonstrating that the techniques and methodologies of waste management, which are currently employed by the nuclear industry, provide adequate management and control of waste activities for the decommissioning of a large scale nuclear plant. The SSDP has some unique aspects in that as part of the objective to promote technology transfer, multiple subcontractors are being utilized in the project. The interfaces resulting from multiple subcontractors require additional controls. Effective control has been accomplished by the use of a process control and inventory system, coupled with personnel training in waste management activities. This report summarizes the waste management plan and provides a status of waste management activities for SSDP.

  5. NOMINATION FOR THE PROJECT MANAGEMENT INSTITUTE (PMI) PROJECT OF THE YEAR AWARD INTEGRATED DISPOSAL FACILITY (IDF)

    SciTech Connect

    MCLELLAN, G.W.

    2007-02-07

    CH2M HILL Hanford Group, Inc. (CH2M HILL) is pleased to nominate the Integrated Disposal Facility (IDF) project for the Project Management Institute's consideration as 2007 Project of the Year, Built for the U.S, Department of Energy's (DOE) Office of River Protection (ORP) at the Hanford Site, the IDF is the site's first Resource Conservation and Recovery Act (RCRA)-compliant disposal facility. The IDF is important to DOE's waste management strategy for the site. Effective management of the IDF project contributed to the project's success. The project was carefully managed to meet three Tri-Party Agreement (TPA) milestones. The completed facility fully satisfied the needs and expectations of the client, regulators and stakeholders. Ultimately, the project, initially estimated to require 48 months and $33.9 million to build, was completed four months ahead of schedule and $11.1 million under budget. DOE directed construction of the IDF to provide additional capacity for disposing of low-level radioactive and mixed (i.e., radioactive and hazardous) solid waste. The facility needed to comply with federal and Washington State environmental laws and meet TPA milestones. The facility had to accommodate over one million cubic yards of the waste material, including immobilized low-activity waste packages from the Waste Treatment Plant (WTP), low-level and mixed low-level waste from WTP failed melters, and alternative immobilized low-activity waste forms, such as bulk-vitrified waste. CH2M HILL designed and constructed a disposal facility with a redundant system of containment barriers and a sophisticated leak-detection system. Built on a 168-area, the facility's construction met all regulatory requirements. The facility's containment system actually exceeds the state's environmental requirements for a hazardous waste landfill. Effective management of the IDF construction project required working through highly political and legal issues as well as challenges with

  6. Project Management of Army Aircraft Survivability Equipment

    DTIC Science & Technology

    1976-11-01

    JTCG/AS Report Number JTCG/ AS-74-D-002, ’Proposed MIL-STD- XXX , Aircraft Nonnuclear Sur- vivability/Vulnerability. Terms" . 3 I VULNEPJ4BILITY - The...the JTCC-/AS program has become the primary interface be- teen the Army and the other Services. *27 * I • • 27 SECTION IV SUM.,n arv Project

  7. Dryden Flight Research Center Critical Chain Project Management Implementation

    NASA Technical Reports Server (NTRS)

    Hines, Dennis O.

    2012-01-01

    In Fiscal Year 2011 Dryden Flight Research Center (DFRC) implemented a new project management system called Critical Chain Project Management (CCPM). Recent NASA audits have found that the Dryden workforce is strained under increasing project demand and that multi-tasking has been carried to a whole new level at Dryden. It is very common to have an individual work on 10 different projects during a single pay period. Employee surveys taken at Dryden have identified work/life balance as the number one issue concerning employees. Further feedback from the employees indicated that project planning is the area needing the most improvement. In addition, employees have been encouraged to become more innovative, improve job skills, and seek ways to improve overall job efficiency. In order to deal with these challenges, DFRC management decided to adopt the CCPM system that is specifically designed to operate in a resource constrained multi-project environment. This paper will discuss in detail the rationale behind the selection of CCPM and the goals that will be achieved through this implementation. The paper will show how DFRC is tailoring the CCPM system to the flight research environment as well as laying out the implementation strategy. Results of the ongoing implementation will be discussed as well as change management challenges and organizational cultural changes. Finally this paper will present some recommendations on how this system could be used by selected NASA projects or centers.

  8. Research project management 101: insiders' tips from Early Career Scientists

    NASA Astrophysics Data System (ADS)

    Cristini, Luisa; Pabortsava, Katsiaryna; Stichel, Torben

    2016-04-01

    From the very beginning of their career, it is important for Early Career Scientists (ECS) to develop project management skills to be able to organise their research efficiently. ECS are often in charge of specific tasks within their projects or for their teams. However, without specific training or tools, the successful completion of these assignments will depend entirely on the organisational skills of individual researchers. ECS are thus facing "sink-or-swim" situations, which can be either instructive or disastrous for their projects. Here we provide experience-based tips from fellow ECS that can help manage various project activities, including: 1. Communication with supervisors and peers 2. Lab management 3. Field trips (e.g., oceanographic campaigns) 4. Internships and collaborations with other institutions 5. Literature/background research 6. Conference convening These are potential "life buoys" for ECS, which will help them to carry out these tasks efficiently and successfully.

  9. JPL Project Information Management: A Continuum Back to the Future

    NASA Technical Reports Server (NTRS)

    Reiz, Julie M.

    2009-01-01

    This slide presentation reviews the practices and architecture that support information management at JPL. This practice has allowed concurrent use and reuse of information by primary and secondary users. The use of this practice is illustrated in the evolution of the Mars Rovers from the Mars Pathfinder to the development of the Mars Science Laboratory. The recognition of the importance of information management during all phases of a project life cycle has resulted in the design of an information system that includes metadata, has reduced the risk of information loss through the use of an in-process appraisal, shaping of project's appreciation for capturing and managing the information on one project for re-use by future projects as a natural outgrowth of the process. This process has also assisted in connection of geographically disbursed partners into a team through sharing information, common tools and collaboration.

  10. Improving Space Project Cost Estimating with Engineering Management Variables

    NASA Technical Reports Server (NTRS)

    Hamaker, Joseph W.; Roth, Axel (Technical Monitor)

    2001-01-01

    Current space project cost models attempt to predict space flight project cost via regression equations, which relate the cost of projects to technical performance metrics (e.g. weight, thrust, power, pointing accuracy, etc.). This paper examines the introduction of engineering management parameters to the set of explanatory variables. A number of specific engineering management variables are considered and exploratory regression analysis is performed to determine if there is statistical evidence for cost effects apart from technical aspects of the projects. It is concluded that there are other non-technical effects at work and that further research is warranted to determine if it can be shown that these cost effects are definitely related to engineering management.

  11. A Quantitative Examination of Critical Success Factors Comparing Agile and Waterfall Project Management Methodologies

    ERIC Educational Resources Information Center

    Pedersen, Mitra

    2013-01-01

    This study investigated the rate of success for IT projects using agile and standard project management methodologies. Any successful project requires use of project methodology. Specifically, large projects require formal project management methodologies or models, which establish a blueprint of processes and project planning activities. This…

  12. Post Implementation Analysis of San Antonio Multi-Service Market Consult and Appointment Management Office (CAMO)

    DTIC Science & Technology

    2007-12-09

    COVERED (From - To) 28/12/2007 lGraduate Management Project 01/10/2005 28/12/2007 4. TITLE AND SUBTITLE 5a. CONTRACT NUMBER Post Implementation Analysis...239.18 CAMO Analysis I Running Head: CAMO ANALYSIS Army-Baylor University Graduate Program in Health Care Administration 0 Graduate Management Project 00... Management Office in November 2004, to consolidate resources and optimize healthcare delivery. The purpose of this analysis was to develop a framework to

  13. Software Schedules Missions, Aids Project Management

    NASA Technical Reports Server (NTRS)

    2008-01-01

    NASA missions require advanced planning, scheduling, and management, and the Space Agency has worked extensively to develop the programs and software suites necessary to facilitate these complex missions. These enormously intricate undertakings have hundreds of active components that need constant management and monitoring. It is no surprise, then, that the software developed for these tasks is often applicable in other high-stress, complex environments, like in government or industrial settings. NASA work over the past few years has resulted in a handful of new scheduling, knowledge-management, and research tools developed under contract with one of NASA s partners. These tools have the unique responsibility of supporting NASA missions, but they are also finding uses outside of the Space Program.

  14. Managing Project Landscapes in Knowledge-Based Enterprises

    NASA Astrophysics Data System (ADS)

    Stantchev, Vladimir; Franke, Marc Roman

    Knowledge-based enterprises are typically conducting a large number of research and development projects simultaneously. This is a particularly challenging task in complex and diverse project landscapes. Project Portfolio Management (PPM) can be a viable framework for knowledge and innovation management in such landscapes. A standardized process with defined functions such as project data repository, project assessment, selection, reporting, and portfolio reevaluation can serve as a starting point. In this work we discuss the benefits a multidimensional evaluation framework can provide for knowledge-based enterprises. Furthermore, we describe a knowledge and learning strategy and process in the context of PPM and evaluate their practical applicability at different stages of the PPM process.

  15. Proposal and Evaluation of Management Method for College Mechatronics Education Applying the Project Management

    NASA Astrophysics Data System (ADS)

    Ando, Yoshinobu; Eguchi, Yuya; Mizukawa, Makoto

    In this research, we proposed and evaluated a management method of college mechatronics education. We applied the project management to college mechatronics education. We practiced our management method to the seminar “Microcomputer Seminar” for 3rd grade students who belong to Department of Electrical Engineering, Shibaura Institute of Technology. We succeeded in management of Microcomputer Seminar in 2006. We obtained the good evaluation for our management method by means of questionnaire.

  16. Use of safety management practices for improving project performance.

    PubMed

    Cheng, Eddie W L; Kelly, Stephen; Ryan, Neal

    2015-01-01

    Although site safety has long been a key research topic in the construction field, there is a lack of literature studying safety management practices (SMPs). The current research, therefore, aims to test the effect of SMPs on project performance. An empirical study was conducted in Hong Kong and the data collected were analysed with multiple regression analysis. Results suggest that 3 of the 15 SMPs, which were 'safety committee at project/site level', 'written safety policy', and 'safety training scheme' explained the variance in project performance significantly. Discussion about the impact of these three SMPs on construction was provided. Assuring safe construction should be an integral part of a construction project plan.

  17. Evaluation on Collaborative Satisfaction for Project Management Team in Integrated Project Delivery Mode

    NASA Astrophysics Data System (ADS)

    Zhang, L.; Li, Y.; Wu, Q.

    2013-05-01

    Integrated Project Delivery (IPD) is a newly-developed project delivery approach for construction projects, and the level of collaboration of project management team is crucial to the success of its implementation. Existing research has shown that collaborative satisfaction is one of the key indicators of team collaboration. By reviewing the literature on team collaborative satisfaction and taking into consideration the characteristics of IPD projects, this paper summarizes the factors that influence collaborative satisfaction of IPD project management team. Based on these factors, this research develops a fuzzy linguistic method to effectively evaluate the level of team collaborative satisfaction, in which the authors adopted the 2-tuple linguistic variables and 2-tuple linguistic hybrid average operators to enhance the objectivity and accuracy of the evaluation. The paper demonstrates the practicality and effectiveness of the method through carrying out a case study with the method.

  18. Interdisciplinarity in an Era of New Public Management: A Case Study of Graduate Business Schools

    ERIC Educational Resources Information Center

    Ryan, Suzanne; Neumann, Ruth

    2013-01-01

    In an era of rapid knowledge transmission and creation spurred on by advances in technology and globalisation, calls for interdisciplinarity to solve "wicked" problems are common. In the same era, universities are increasingly adopting new public management practices. The extent to which these practices affect knowledge production is an…

  19. Undocumented and Unafraid: Understanding the Disclosure Management Process for Undocumented College Students and Graduates

    ERIC Educational Resources Information Center

    Muñoz, Susana M.

    2016-01-01

    Previous qualitative studies on undocumented college students have primarily focused on their lived experiences; however, little research has been done to consider the disclosure process or identity management for undocumented students, particularly students who self-identify as "undocumented and unafraid." Using research on legal…

  20. Phillips Lab Project Manager’s Handbook

    DTIC Science & Technology

    1994-04-15

    7 PROJECT MANAGEMET PLHI 61-1 15 April 1994 Militarily Critical (805) 275-6190; DSN 525-6190FAX: (805) 275-5739; DSN 525-5739 Techn a1ogies List...Kirtland. Most classes are held during duty hours. (All after duty hour in our computer classroom . Those requiring college courses must be handled by...RF radiation must be eye exams, laser certifications by the reported immediately to the base BES and Bloenvironmental Engineering Services the safety

  1. Online Project Based Learning in Innovation Management.

    ERIC Educational Resources Information Center

    O'Sullivan, David

    2003-01-01

    An innovation management course has three strands with face-to-face and online components: (1) seminars with online course notes and slides; (2) assignments (group online case studies, tutorials, in-class presentations); and (3) assessment (online, oral, in-class, written). Students are able to benchmark their work online and teachers use the…

  2. Disruption of Information Technology Projects: The Reactive Decoupling of Project Management Methodologies

    ERIC Educational Resources Information Center

    Schmitz, Kurt W.

    2013-01-01

    Information Technology projects have migrated toward two dominant Project Management (PM) methodologies. Plan-driven practices provide organizational control through highly structured plans, schedules, and specifications that facilitate oversight by hierarchical bureaucracies. In contrast, agile practices emphasize empowered teams using flexible…

  3. The science of laboratory and project management in regulated bioanalysis.

    PubMed

    Unger, Steve; Lloyd, Thomas; Tan, Melvin; Hou, Jingguo; Wells, Edward

    2014-05-01

    Pharmaceutical drug development is a complex and lengthy process, requiring excellent project and laboratory management skills. Bioanalysis anchors drug safety and efficacy with systemic and site of action exposures. Development of scientific talent and a willingness to innovate or adopt new technology is essential. Taking unnecessary risks, however, should be avoided. Scientists must strategically assess all risks and find means to minimize or negate them. Laboratory Managers must keep abreast of ever-changing technology. Investments in instrumentation and laboratory design are critical catalysts to efficiency and safety. Matrix management requires regular communication between Project Managers and Laboratory Managers. When properly executed, it aligns the best resources at the right times for a successful outcome. Attention to detail is a critical aspect that separates excellent laboratories. Each assay is unique and requires attention in its development, validation and execution. Methods, training and facilities are the foundation of a bioanalytical laboratory.

  4. Data management for interdisciplinary field experiments: OTTER project support

    NASA Technical Reports Server (NTRS)

    Angelici, Gary; Popovici, Lidia; Skiles, J. W.

    1993-01-01

    The ability of investigators of an interdisciplinary science project to properly manage the data that are collected during the experiment is critical to the effective conduct of science. When the project becomes large, possibly including several scenes of large-format remotely sensed imagery shared by many investigators requiring several services, the data management effort can involve extensive staff and computerized data inventories. The OTTER (Oregon Transect Ecosystem Research) project was supported by the PLDS (Pilot Land Data System) with several data management services, such as data inventory, certification, and publication. After a brief description of these services, experiences in providing them are compared with earlier data management efforts and some conclusions regarding data management in support of interdisciplinary science are discussed. In addition to providing these services, a major goal of this data management capability was to adopt characteristics of a pro-active attitude, such as flexibility and responsiveness, believed to be crucial for the effective conduct of active, interdisciplinary science. These are also itemized and compared with previous data management support activities. Identifying and improving these services and characteristics can lead to the design and implementation of optimal data management support capabilities, which can result in higher quality science and data products from future interdisciplinary field experiments.

  5. Defense Acquisition Reform and Project Management

    DTIC Science & Technology

    2007-11-02

    ANSI / EIA 748 -98 Earned Value Management Systems – For now, DoD and industry EVMS criteria are equal – International discussions ongoing Canada, UK...Advantage Government Industry IBRs 32 EVMS Criteria Regulations Revised Advance Agreements IBRs ANSI - EIA 748 - Incorporate ANSI - EIA 748 in DoD...Rev. 8-98) Prescribed by ANSI Std Z39.18 DoD Acquisition Reform u The acquisition environment – Industrial base consolidation u Earned Value

  6. The three-dimensional matrix -- An evolution in project management

    SciTech Connect

    Glidewell, D.

    1996-09-01

    In the Functional Department Dimension, functional departments such as project management, design, and construction would be maintained to maximize consistency among project teams, evenly allocate training opportunities, and facilitate the crossfeeding of lessons learned and innovative ideas. Functional departments were also determined to be the surest way of complying uniformly with all project control systems required by the Department of Energy (Sandia`s primary external customer). The Technical Discipline dimension was maintained to enhance communication within the technical disciplines, such as electrical engineering, mechanical engineering, civil engineering, etc., and to evenly allocate technical training opportunities, reduce technical obsolescence, and enhance design standards. The third dimension, the Project Dimension, represents the next step in the project management evolution at Sandia, and together with Functional Department and Technical Discipline Dimensions constitutes the three-dimensional matrix. It is this Project Dimension that will be explored thoroughly in this paper, including a discussion of the specific roles and responsibilities of both management and the project team.

  7. Utilizing Strategic Project Management Processes and the NATO Code of Best Practice to Improve Management of Experimentation Events

    DTIC Science & Technology

    2009-06-01

    information have been suggested as being resources of projects ( PMBOK , 2002). Therefore, they are one of the key aspects of strategic project management...Assessment, Revision 2002.” DoD CCRP Press, Washington, DC PMBOK -Project Management Body of Knowledge, Project Management Institute Press, 2002 Tolk, A

  8. Information Management for a Large Multidisciplinary Project

    NASA Technical Reports Server (NTRS)

    Jones, Kennie H.; Randall, Donald P.; Cronin, Catherine K.

    1992-01-01

    In 1989, NASA's Langley Research Center (LaRC) initiated the High-Speed Airframe Integration Research (HiSAIR) Program to develop and demonstrate an integrated environment for high-speed aircraft design using advanced multidisciplinary analysis and optimization procedures. The major goals of this program were to evolve the interactions among disciplines and promote sharing of information, to provide a timely exchange of information among aeronautical disciplines, and to increase the awareness of the effects each discipline has upon other disciplines. LaRC historically has emphasized the advancement of analysis techniques. HiSAIR was founded to synthesize these advanced methods into a multidisciplinary design process emphasizing information feedback among disciplines and optimization. Crucial to the development of such an environment are the definition of the required data exchanges and the methodology for both recording the information and providing the exchanges in a timely manner. These requirements demand extensive use of data management techniques, graphic visualization, and interactive computing. HiSAIR represents the first attempt at LaRC to promote interdisciplinary information exchange on a large scale using advanced data management methodologies combined with state-of-the-art, scientific visualization techniques on graphics workstations in a distributed computing environment. The subject of this paper is the development of the data management system for HiSAIR.

  9. NASA Ames DEVELOP Interns: Helping the Western United States Manage Natural Resources One Project at a Time

    NASA Technical Reports Server (NTRS)

    Justice, Erin; Newcomer, Michelle

    2010-01-01

    The western half of the United States is made up of a number of diverse ecosystems ranging from arid desert to coastal wetlands and rugged forests. Every summer for the past 7 years students ranging from high school to graduate level gather at NASA Ames Research Center (ARC) as part of the DEVELOP Internship Program. Under the guidance of Jay Skiles [Ames Research Center (ARC) - Ames DEVELOP Manager] and Cindy Schmidt [ARC/San Jose State University Ames DEVELOP Coordinator] they work as a team on projects exploring topics including: invasive species, carbon flux, wetland restoration, air quality monitoring, storm visualizations, and forest fires. The study areas for these projects have been in Washington, Utah, Oregon, Nevada, Hawaii, Alaska and California. Interns combine data from NASA and partner satellites with models and in situ measurements to complete prototype projects demonstrating how NASA data and resources can help communities tackle their Earth Science related problems.

  10. Experience of the creative Space-Astrophysics Education in Israeli Science-Educational Center "Blossoms of Science" - creative activity from mini-projects in basic school to ASTROTOP-projects for graduates

    NASA Astrophysics Data System (ADS)

    Pustil'Nik, L.; Pundak, D.

    We present 12 year experience of educational project in Space Astrophysics Environment field realized on the base of National Science-Educational Center Blossoms of Science of the Jordan Valley College Our approach is based on the natural curiosity of children as driver of their self-development from the first minutes of their life and even in adult state This approach shift center of the weight in educational process from direct lectures sermons explanation from teacher to children on own attempts of children to investigate problem what is interesting for them by themselves individually or in group Our approach includes four levels of the projects nano-projects for children garden and basic school up to 10-12 years micro-projects for intermediate school 12-16 years mini-projects for high school 16-18 years and macro-projects for the best graduates high schools and students of colleges 17-22 years These levels and projects are interconnected one with another and sometimes participants started on the micro-projects level in intermediate school continue their activity up to macro-projects of the graduate s diploma level For each level we organize courses for preparation of the teachers and instructors interested in the using of our receipts and published books and brochures for them The content of our activity for different levels a Level of kinder gardens-basic schools -- special software with interactive movie - - nano-projects b Level of intermediate school Days of Science in tens schools of Israel--

  11. Impact of senior design project for the development of leadership and management skills in construction management

    NASA Astrophysics Data System (ADS)

    Chowdhury, Tamara

    2013-08-01

    Senior design courses are a core part of curricula across engineering and technology disciplines. Such courses offer Construction Management (CMG) students the opportunity to bring together, assimilate and apply the knowledge they have acquired over their entire undergraduate academic programme to an applied technical project. Senior or Capstone design course engages students in a real-world project, enhance leadership development, and prepare to manage and lead project teams. The CMG programme's multidisciplinary approach at Alabama A&M University, combines essential components of construction techniques with concepts of business management to develop technically qualified individuals for responsible management roles in the design, construction and operation of major construction projects. This paper analyses the performance of the students and improvement due to the interaction with the faculty advisors and industrial panel during the two semester Capstone project. The results of this Capstone sequence have shown a continuous improvement of student performance.

  12. Graduate education

    SciTech Connect

    Bugliarello, G.

    1995-12-31

    The author presents the crisis in graduate education with the universities producing more Ph.D.s than academic employers. Trends in the growth of graduate degrees for scientific, medical and engineering students and how the system is coping are examined. Several models are considered for dealing with the problems.

  13. Designing an Academic Project Management Program: A Collaboration between a University and a PMI Chapter

    ERIC Educational Resources Information Center

    Poston, Robin S.; Richardson, Sandra M.

    2011-01-01

    The demand for project management skills in industry is increasing resulting in a higher demand for project management educational programs. Universities are addressing industry demand by developing project management courses, degree offerings and certificate programs that focus on both technical and general project management skills. While…

  14. Appreciating the Complexity of Project Management Execution: Using Simulation in the Classroom

    ERIC Educational Resources Information Center

    Hartman, Nathan S.; Watts, Charles A.; Treleven, Mark D.

    2013-01-01

    As the popularity and importance of project management increase, so does the need for well-prepared project managers. This article discusses our experiences using a project management simulation in undergraduate and MBA classes to help students better grasp the complexity of project management. This approach gives students hands-on experience with…

  15. Sound waste management plan. Restoration project 95115. Exxon Valdez oil spill restoration project final report

    SciTech Connect

    1996-02-01

    The project was designed to address marine pollution that is generated from landbased sources within the Prince William Sound communities of Cordova, Valdez, Whittier Tatitlek, and Chenega Bay. The project recommends ways to improve the management of three different waste streams generated within the communities and which are a chronic source of marine pollution: used oil, household hazardous waste, and solid waste. The recommendations, some of which have already been implemented, include: creation of a comprehensive used oil management system in each community, construction of Environmental Operation Stations to improve the overall management of solid and oily wastes, and the development of a regional household hazardous waste program.

  16. Was Project Management Life Really Better in Apollo?

    NASA Technical Reports Server (NTRS)

    2010-01-01

    This slide presentation discusses the question of "Was Project Management Life Really Better in Apollo?" Was money really flowing freely all through Apollo? Are we wallowing in nostalgia and comparing current circumstances to a managerial time which did not exist? This talk discusses these and other questions as background for you as today s project managers. There are slides showing the timelines from before the speech that Kennedy gave promising to land a man on the moon, to the early 60's, when the manned space center prepared the preliminary lunar landing mission design, an NASA organization chart from 1970, various photos of the rockets, and the astronauts are presented. The next slides discuss the budgets from the 1960's to the early 1970's. Also the results of a survey of 62 managers, who were asked "What problems pose the greatest obstacles to successful project performance?"

  17. Project management of DAG: Eastern Anatolia Observatory

    NASA Astrophysics Data System (ADS)

    Keskin, Onur; Yesilyaprak, Cahit; Yerli, Sinan K.; Zago, Lorenzo; Guver, Tolga; Alis, Sinan

    2016-08-01

    The four meter DAG (Eastern Anatolia Observatory in Turkish) telescope is not only the largest telescope in Turkey but also the most promising telescope in the northern hemisphere with a large potential to offer scientific observations with its cutting edge technology. DAG is designed to be an AO telescope which will allow both infrared and visible observations with its two Nasmyth platforms dedicated to next generation focal plane instruments. In this paper, status updates from DAG telescope will be presented in terms of; (i) in house optical design of DAG, (ii) tender process of telescope, (iii) tender process of enclosure, and (iv) tender process of the observatory building. Also status updates from the focal plane instruments project and possible collaboration activities will be presented.

  18. 75 FR 55109 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    ... Defense Science and Technology Reinvention Laboratory Personnel Management Demonstration Project... Reinvention Laboratory Personnel Management Demonstration Project, Department of the Army, Army Research... Defense to conduct personnel demonstration projects at DoD laboratories designated as Science...

  19. 75 FR 55199 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-09

    ... Defense Science and Technology Reinvention Laboratory Personnel Management Demonstration Project... Reinvention Laboratory Personnel Management Demonstration Project, Department of the Army, Army Research... Secretary of Defense to conduct personnel demonstration projects at DoD laboratories designated as...

  20. Unmanned space project management: Surveyor and lunar orbiter

    NASA Technical Reports Server (NTRS)

    Kloman, E. H.

    1972-01-01

    An analysis of the management of two major NASA projects, Surveyor and Lunar Orbiter is presented. The analysis reflects the comments and criticisms of many NASA officials who were responsible for various phases of the projects as well as comments by knowledgeable persons outside NASA. Findings are submitted with respect to; (1) environment, (2) role of individuals, (3) teamwork, (4) roles and missions, (5) organization, and (6) cost performance.