Science.gov

Sample records for gramont schedule lv5fu2

  1. Randomized phase III trial in elderly patients comparing LV5FU2 with or without irinotecan for first-line treatment of metastatic colorectal cancer (FFCD 2001-02).

    PubMed

    Aparicio, T; Lavau-Denes, S; Phelip, J M; Maillard, E; Jouve, J L; Gargot, D; Gasmi, M; Locher, C; Adhoute, X; Michel, P; Khemissa, F; Lecomte, T; Provençal, J; Breysacher, G; Legoux, J L; Lepère, C; Charneau, J; Cretin, J; Chone, L; Azzedine, A; Bouché, O; Sobhani, I; Bedenne, L; Mitry, E

    2016-01-01

    Metastatic colorectal cancer (mCRC) frequently occurs in elderly patients. However, data from a geriatric tailored randomized trial about tolerance to and the efficacy of doublet chemotherapy (CT) with irinotecan in the elderly are lacking. The benefit of first-line CT intensification remains an issue in elderly patients. Elderly patients (75+) with previously untreated mCRC were randomly assigned in a 2 × 2 factorial design (four arms) to receive 5-FU (5-fluorouracil)-based CT, either alone (FU: LV5FU2 or simplified LV5FU2) or in combination with irinotecan [IRI: LV5FU2-irinotecan or simplified LV5FU2-irinotecan (FOLFIRI)]. The CLASSIC arm was defined as LV5FU2 or LV5FU2-irinotecan and the SIMPLIFIED arm as simplified LV5FU2 or FOLFIRI. The primary end point was progression-free survival (PFS). Secondary end points were overall survival (OS), safety and objective response rate (ORR). From June 2003 to May 2010, 71 patients were randomly assigned to LV5FU2, 71 to simplified LV5FU2, 70 to LV5FU2-irinotecan and 70 to FOLFIRI. The median age was 80 years (range 75-92 years). No significant difference was observed for the median PFS: FU 5.2 months versus IRI 7.3 months, hazard ratio (HR) = 0.84 (0.66-1.07), P = 0.15 and CLASSIC 6.5 months versus SIMPLIFIED 6.0 months, HR = 0.85 (0.67-1.09), P = 0.19. The ORR was superior in IRI (P = 0.0003): FU 21.1% versus IRI 41.7% and in CLASSIC (P = 0.04): CLASSIC 37.1% versus SIMPLIFIED 25.6%. Median OS was 14.2 months in FU versus 13.3 months in IRI, HR = 0.96 (0.75-1.24) and 15.2 months in CLASSIC versus 11.4 months in SIMPLIFIED, HR = 0.71 (0.55-0.92). More patients presented grade 3-4 toxicities in IRI (52.2% versus 76.3%). In this elderly population, adding irinotecan to an infusional 5-FU-based CT did not significantly increase either PFS or OS. Classic LV5FU2 was associated with an improved OS compared with simplified LV5FU2. NCT00303771. © The Author 2015. Published by Oxford University Press on behalf of the European

  2. A randomized phase II study of weekly nab-paclitaxel plus gemcitabine or simplified LV5FU2 as first-line therapy in patients with metastatic pancreatic cancer: the AFUGEM GERCOR trial.

    PubMed

    Bachet, Jean-Baptiste; Chibaudel, Benoist; Bonnetain, Franck; Validire, Pierre; Hammel, Pascal; André, Thierry; Louvet, Christophe

    2015-10-06

    Metastatic pancreatic adenocarcinoma (PAC) prognosis remains dismal and gemcitabine monotherapy has been the standard treatment over the last decade. Currently, two first-line regimens are used in this setting: FOLFIRINOX and nab-paclitaxel plus gemcitabine. Increasing translational data on the predictive value of hENT1 for determining gemcitabine efficacy suggest that a non-gemcitabine-based regimen is favored in about 60 % of patients with PAC due to high resistance of PAC to this cytotoxic drug. This study aims to evaluate the efficacy of weekly nab-paclitaxel combined with gemcitabine or a simplified (s) LV5FU2 regimen in patients with previously untreated metastatic PAC. AFUGEM is a two-stage, open-label, randomized, multicenter, phase II trial. Patients with PAC who meet the inclusion criteria and provide written informed consent will be randomized in a 1:2 ratio to either nab-paclitaxel (125 mg/m(2)) plus gemcitabine (1000 mg/m(2)) given on days 1, 8, and 15 every 28 days or nab-paclitaxel (125 mg/m(2)) plus sLV5FU2 (leucovorin 400 mg/m(2) followed by bolus 400 mg/m(2) 5-fluorouracil and by 5-fluorouracil 2400 mg/m(2) as an 46-h intravenous infusion) given on days 1 and 15 every 28 days. A total of 114 patients will be randomized to one of the treatment arms. The primary endpoint is progression-free survival at 4 months. Secondary outcomes are rate and duration of response, disease control, overall survival, safety, and quality of life. Potential biomarkers of gemcitabine (hENT1, dCK) and 5-fluorouracil (TS) efficacy will be assessed. The AFUGEM trial is designed to provide valuable information regarding efficacy and tolerability of nab-paclitaxel plus gemcitabine and nab-paclitaxel plus sLV5FU2 regimens. Identification of potential predictive biomarkers of gemcitabine and 5-fluorouracil is likely to drive therapeutic decisions in patients with metastatic PAC. AFUGEM is registered at Clinicaltrials.gov: NCT01964534 , October 15, 2013.

  3. Modified de Gramont with oxaliplatin in the first-line treatment of advanced colorectal cancer.

    PubMed

    Braun, M S; Adab, F; Bradley, C; McAdam, K; Thomas, G; Wadd, N J; Rea, D; Philips, R; Twelves, C; Bozzino, J; MacMillan, C; Saunders, M P; Counsell, R; Anderson, H; McDonald, A; Stewart, J; Robinson, A; Davies, S; Richards, F J; Seymour, M T

    2003-10-06

    We previously reported high activity for oxaliplatin and a modified de Gramont regimen (OxMdG) in a single centre study of patients with metastatic colorectal cancer. We now report results with a further 56 patients treated at 14 centres. Low rates of grade 3 and 4 toxicity were seen, with no toxic deaths. Objective response rates were CR/PR=53%; NC=34.7%; PD=12.2%. Median time to progression was 8.3 months and overall survival was 14.5 months. This regimen is more convenient than those based around the conventional de Gramont regimen but is highly active and well tolerated; it forms part of a current UK MRC phase 3 trial.

  4. Randomized phase III trial comparing biweekly infusional fluorouracil/leucovorin alone or with irinotecan in the adjuvant treatment of stage III colon cancer: PETACC-3.

    PubMed

    Van Cutsem, Eric; Labianca, Roberto; Bodoky, György; Barone, Carlo; Aranda, Enrique; Nordlinger, Bernard; Topham, Claire; Tabernero, Josep; André, Thierry; Sobrero, Alberto F; Mini, Enrico; Greil, Richard; Di Costanzo, Francesco; Collette, Laurence; Cisar, Laura; Zhang, Xiaoxi; Khayat, David; Bokemeyer, Carsten; Roth, Arnaud D; Cunningham, David

    2009-07-01

    PURPOSE The primary objective of this randomized, multicenter, phase III trial was to investigate whether the addition of irinotecan to the de Gramont infusional fluorouracil (FU)/leucovorin (LV) adjuvant regimen (LV5FU2) would improve disease-free survival (DFS) in patients with stage III colon cancer. PATIENTS AND METHODS After curatively intentioned surgery, patients with stage II and III colon cancer were randomly allocated surgery to receive LV5FU2 (LV 200 mg/m(2) as a 2-hour infusion, followed by FU; as a 400 mg/m(2) bolus and then a 600 mg/m(2) continuous infusion over 22 hours, days 1 and 2, every 2 weeks for 12 cycles: de Gramont regimen) with or without irinotecan (180 mg/m(2) as a 30- to 90-minute infusion, day 1, every 2 weeks). In total, 260 (7.9%) of 3,278 patients received an alternative high-dose infusional FU/LV regimen (Arbeitsgemeinschaft Internische Onkologie regimen) with or without irinotecan. Results The principal efficacy analysis was based on 2,094 treated patients with stage III disease, randomly allocated in the LV5FU2 strata. After a median follow-up of 66.3 months, the 5-year DFS rate was 56.7% with irinotecan/LV5FU2 and 54.3% with LV5FU2 alone (primary end point: log-rank P = .106). Combining irinotecan with LV5FU2 did not significantly improve overall survival in this patient group compared with LV5FU2 alone (5-year rate 73.6% v 71.3%, respectively; log-rank P = .094). The addition of irinotecan to LV5FU2 was associated with an increased incidence of grade 3 to 4 GI events and neutropenia. CONCLUSION Irinotecan added to LV5FU2 as adjuvant therapy did not confer a statistically significant improvement in DFS or overall survival in patients with stage III colon cancer compared with LV5FU2 alone.

  5. Bifractionated CPT-11 with LV5FU2 infusion (FOLFIRI-3) in combination with bevacizumab: clinical outcomes in first-line metastatic colorectal cancers according to plasma angiopoietin-2 levels

    PubMed Central

    2013-01-01

    Background Optimization of chemotherapy effectiveness in metastatic colorectal cancers (mCRC) is a major endpoint to enhance the possibility of curative intent surgery. FOLFIRI3 has shown promising results as second-line chemotherapy for mCRC patients previously exposed to oxaliplatin. The clinical efficacy of FOLFIRI3 was never determined in association with bevacizumab in non-previously treated mCRC patients. Methods We conducted a phase II clinical trial to characterize the response rate and toxicity profile of FOLFIRI3-bevacizumab as initial treatment for mCRC. Sixty-one patients enrolled in 3 investigation centers were treated with FOLFIRI3-bevacizumab (median of 10 cycles) followed by a maintenance therapy combining bevacizumab and capecitabine. Levels of plasma angiopoietin-2 (Ang-2) were measured by enzyme-linked immunosorbent assay at baseline. Results Overall response rate (ORR) was 66.7% (8% of complete and 58% of partial responses). The disease control rate was 91.7%. After a median time of follow-up of 46.7 months, 56 patients (92%) had progressed or died. The median progression free survival (PFS) was 12.7 months (95% confidence interval (CI) 9.7-15.8 months). The median overall survival (OS) was 24.5 months (95% CI: 10.6-38.3 months). Twenty-one patients underwent curative intent-surgery including 4 patients with disease initially classified as unresectable. Most common grade III-IV toxicities were diarrhea (15%), neutropenia (13%), asthenia (10%), and infections (4%). Hypertension-related medications needed to be increased in 3 patients. In multivariate analysis, surgery of metastases and Ang-2 levels were the only independent prognostic factors for PFS and OS. Indeed, baseline level of Ang-2 above 5 ng/mL was confirmed as an independent prognostic factor for progression free survival (HR = 0.357; 95% CI: 0.168-0.76, p = 0.005) and overall survival (HR = 0.226; 95% CI: 0.098-0.53, p = 0.0002). Conclusions As front-line therapy, FOLFIRI-3-bevacizumab is associated with an acceptable toxicity and induced promising objective response rates. However, unfavorable clinical outcomes were observed in patients with high levels of angiopoietin-2. PMID:24373251

  6. Flexible Scheduling.

    ERIC Educational Resources Information Center

    Davis, Harold S.; Bechard, Joseph E.

    A flexible schedule allows teachers to change group size, group composition, and class length according to the purpose of the lesson. This pamphlet presents various "master" schedules for flexible scheduling: (1) Simple block schedules, (2) back-to-back schedules, (3) interdisciplinary schedules, (4) school-wide block schedules, (5) open-lab…

  7. Scheduling Supercomputers.

    DTIC Science & Technology

    1983-02-01

    no task is scheduled with overlap. Let numpi be the total number of preemptions and idle slots of size at most to that are introduced. We see that if...no usable block remains on Qm-*, then numpi < m-k. Otherwise, numpi ! m-k-1. If j>n when this procedure terminates, then all tasks have been scheduled

  8. Composite Scheduling

    ERIC Educational Resources Information Center

    Childers, Gary L.; Ireland, Rebecca Weeks

    2005-01-01

    In education, there is no one best way to do anything. There are compelling reasons why some courses should be taught in longer segments of time, which the block schedule provides. There are also compelling reasons why some classes should be taught in shorter segments. At Watauga High School in Boone, North Carolina, an alternative schedule that…

  9. Scheduling game

    SciTech Connect

    Kleck, W

    1982-04-01

    Structuring a schedule - whether by Critical Path Method (CPM) or Precedence Charting System (PCS) - involves estimating the duration of one or more activities and arranging them in the most logical sequence. Given the start date, the completion date is relatively simple to determine. What is then so complicated about the process. It is complicated by the people involved - the people who make the schedules and the people who attempt to follow them. Schedules are an essential part of project management and construction contract administration. Much of the material available pertains to the mechanics of schedules, the types of logic networks, the ways that data can be generated and presented. This paper sheds light on other facets of the subject - the statistical and philosophical fundamentals involved in scheduling.

  10. Mission scheduling

    NASA Technical Reports Server (NTRS)

    Gaspin, Christine

    1989-01-01

    How a neural network can work, compared to a hybrid system based on an operations research and artificial intelligence approach, is investigated through a mission scheduling problem. The characteristic features of each system are discussed.

  11. Scheduling algorithms

    NASA Astrophysics Data System (ADS)

    Wolfe, William J.; Wood, David; Sorensen, Stephen E.

    1996-12-01

    This paper discusses automated scheduling as it applies to complex domains such as factories, transportation, and communications systems. The window-constrained-packing problem is introduced as an ideal model of the scheduling trade offs. Specific algorithms are compared in terms of simplicity, speed, and accuracy. In particular, dispatch, look-ahead, and genetic algorithms are statistically compared on randomly generated job sets. The conclusion is that dispatch methods are fast and fairly accurate; while modern algorithms, such as genetic and simulate annealing, have excessive run times, and are too complex to be practical.

  12. ASTER Scheduling Prioritization Function

    NASA Technical Reports Server (NTRS)

    Cohen, Ron

    1996-01-01

    ASTER schedules are generated by an automated scheduling system. This scheduler will generate psuedo-optimal schedules based on a priority scheme. This priority scheme is controlled by the Science Team.

  13. DSIF station schedules

    NASA Technical Reports Server (NTRS)

    Flarity, L. D.; Hanson, R. J.; Thom, E. H.

    1971-01-01

    System manages Deep Space Instrumentation Facilities /DSIF/ equipment construction and modification planning. Versatile program applies to such tasks as employee time and task schedules, pay schedules, operations schedules, and plant and equipment procurement, construction, modification or service.

  14. The Hybrid Schedule: Scheduling to the Curriculum.

    ERIC Educational Resources Information Center

    Boarman, Gerald L.; Kirkpatrick, Barbara S.

    1995-01-01

    A series of experiments with single and double mod scheduling at a large suburban Maryland high school has led to a highly flexible schedule that meets teachers' and students' needs. This schedule allows courses to be offered in the most suitable format, creates more time for students and teachers, streamlines hallway traffic, and fosters a team…

  15. Iterative refinement scheduling

    NASA Technical Reports Server (NTRS)

    Biefeld, Eric

    1992-01-01

    We present a heuristics-based approach to deep space mission scheduling which is modeled on the approach used by expert human schedulers in producing schedules for planetary encounters. New chronological evaluation techniques are used to focus the search by using information gained during the scheduling process to locate, classify, and resolve regions of conflict. Our approach is based on the assumption that during the construction of a schedule there exist several disjunct temporal regions where the demand for one resource type or a single temporal constraint dominates (bottleneck regions). If the scheduler can identify these regions and classify them based on their dominant constraint, then the scheduler can select the scheduling heuristic.

  16. Scheduler's assistant: a tool for intelligent scheduling

    NASA Astrophysics Data System (ADS)

    Griffin, Neal L.

    1991-03-01

    The objective of this project was to use expert system technology to aid in the scheduling activities performed at the White Sands Missile Range (WSMR). The WSMR range scheduling problem presents a complex interactive environment. A human factors approach was undertaken, in that, the goal was to implement a system which mimics current WSMR scheduling procedures. The results of this project have produced a prototypic scheduling tool, called Scheduler's Assistant (SA), to aid WSMR range schedulers to generate a daily schedule. The system provides resource conflict detection and resolution advice through a series of cooperating expert systems. Immediate advantages of the system are increased safety, insurance of proper schedule execution and improved speed for turnaround time of sudden schedule changes. Additional benefits of SA include: expandability as future operations grow, allows for rapid redeployment for changing resources, promotes efficient management of WSMR resources, provides a formal representation of knowledge such that years of range personnel experience is preserved and enables the flexibility of a scheduling aid as opposed to a rigid methodology. Prior development efforts by Perceptics have produced a sophisticated expert system development tool, called Knowledge Shaper, which was used to implement all of the expert systems. The development of SA included a library of routines (the SA toolbox) to permit the manipulation of internal data tables and define a data transfer protocol to and from the SA environment. The combination of Knowledge Shaper and the SA toolbox provide a powerful set of design tools for the development of future scheduling applications.

  17. Protocols for distributive scheduling

    NASA Technical Reports Server (NTRS)

    Richards, Stephen F.; Fox, Barry

    1993-01-01

    The increasing complexity of space operations and the inclusion of interorganizational and international groups in the planning and control of space missions lead to requirements for greater communication, coordination, and cooperation among mission schedulers. These schedulers must jointly allocate scarce shared resources among the various operational and mission oriented activities while adhering to all constraints. This scheduling environment is complicated by such factors as the presence of varying perspectives and conflicting objectives among the schedulers, the need for different schedulers to work in parallel, and limited communication among schedulers. Smooth interaction among schedulers requires the use of protocols that govern such issues as resource sharing, authority to update the schedule, and communication of updates. This paper addresses the development and characteristics of such protocols and their use in a distributed scheduling environment that incorporates computer-aided scheduling tools. An example problem is drawn from the domain of space shuttle mission planning.

  18. Aspects of job scheduling

    NASA Technical Reports Server (NTRS)

    Phillips, K.

    1976-01-01

    A mathematical model for job scheduling in a specified context is presented. The model uses both linear programming and combinatorial methods. While designed with a view toward optimization of scheduling of facility and plant operations at the Deep Space Communications Complex, the context is sufficiently general to be widely applicable. The general scheduling problem including options for scheduling objectives is discussed and fundamental parameters identified. Mathematical algorithms for partitioning problems germane to scheduling are presented.

  19. Aspects of job scheduling

    NASA Technical Reports Server (NTRS)

    Phillips, K.

    1976-01-01

    A mathematical model for job scheduling in a specified context is presented. The model uses both linear programming and combinatorial methods. While designed with a view toward optimization of scheduling of facility and plant operations at the Deep Space Communications Complex, the context is sufficiently general to be widely applicable. The general scheduling problem including options for scheduling objectives is discussed and fundamental parameters identified. Mathematical algorithms for partitioning problems germane to scheduling are presented.

  20. Dedicated heterogeneous node scheduling including backfill scheduling

    DOEpatents

    Wood, Robert R.; Eckert, Philip D.; Hommes, Gregg

    2006-07-25

    A method and system for job backfill scheduling dedicated heterogeneous nodes in a multi-node computing environment. Heterogeneous nodes are grouped into homogeneous node sub-pools. For each sub-pool, a free node schedule (FNS) is created so that the number of to chart the free nodes over time. For each prioritized job, using the FNS of sub-pools having nodes useable by a particular job, to determine the earliest time range (ETR) capable of running the job. Once determined for a particular job, scheduling the job to run in that ETR. If the ETR determined for a lower priority job (LPJ) has a start time earlier than a higher priority job (HPJ), then the LPJ is scheduled in that ETR if it would not disturb the anticipated start times of any HPJ previously scheduled for a future time. Thus, efficient utilization and throughput of such computing environments may be increased by utilizing resources otherwise remaining idle.

  1. Interference Cognizant Network Scheduling

    NASA Technical Reports Server (NTRS)

    Varadarajan, Srivatsan (Inventor); Hall, Brendan (Inventor); Smithgall, William Todd (Inventor); Bonk, Ted (Inventor); DeLay, Benjamin F. (Inventor)

    2017-01-01

    Systems and methods for interference cognizant network scheduling are provided. In certain embodiments, a method of scheduling communications in a network comprises identifying a bin of a global timeline for scheduling an unscheduled virtual link, wherein a bin is a segment of the timeline; identifying a pre-scheduled virtual link in the bin; and determining if the pre-scheduled and unscheduled virtual links share a port. In certain embodiments, if the unscheduled and pre-scheduled virtual links don't share a port, scheduling transmission of the unscheduled virtual link to overlap with the scheduled transmission of the pre-scheduled virtual link; and if the unscheduled and pre-scheduled virtual links share a port: determining a start time delay for the unscheduled virtual link based on the port; and scheduling transmission of the unscheduled virtual link in the bin based on the start time delay to overlap part of the scheduled transmission of the pre-scheduled virtual link.

  2. Distributed scheduling with COMPASS

    NASA Technical Reports Server (NTRS)

    Rufat-Latre, Jorge; Culbert, Chris

    1991-01-01

    COMPASS (COMPuter Aided Scheduling System) is a sophisticated, interactive scheduling tool used within NASA. Like most existing tools, however, COMPASS is a single-user application. There is a large class of scheduling problems which may be better solved by allowing several people at various locations to build separate schedules with shared resources. DISCORS (DIStributed COmputer Resource Scheduling) is a set of services which support a distributed version of COMPASS. This architecture naturally accommodates the integration of user-defined resource models without modifying COMPASS. DISCORS services include the ability to establish and manage communications, to code messages in efficient formats, to provide fault detection and recovery, and to configure schedulers across a network. In its present form, DISCORS effectively supports distributed COMPASS, but fails to run fast and to guarantee efficient schedules. Further enhancements may allow several users to simultaneously and interactively work together to create complex schedules while COMPASS detects and coordinates the resolution of conflicting requests.

  3. Class Schedules Need Class.

    ERIC Educational Resources Information Center

    Monfette, Ronald J.

    1986-01-01

    Argues that college publications, including class schedules, must be accurate, timely, and easy to read and follow. Describes Schoolcraft College's unified format approach to publications marketing. Offers suggestions on the design, format, and distribution of class schedules. (DMM)

  4. Immunization Schedules for Adults

    MedlinePlus

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedules for Adults in Easy-to-read Formats ... previous immunizations. View or Print a Schedule Recommended Immunizations for Adults (19 Years and Older) by Age ...

  5. Instant Childhood Immunization Schedule

    MedlinePlus

    ... Recommendations Why Immunize? Vaccines: The Basics Instant Childhood Immunization Schedule Recommend on Facebook Tweet Share Compartir Get ... date. See Disclaimer for additional details. Based on Immunization Schedule for Children 0 through 6 Years of ...

  6. School Construction Scheduling.

    ERIC Educational Resources Information Center

    Delaney, J. B.

    1983-01-01

    Explains that favorable market and working conditions influence the scheduling of school construction projects. Facility planners, architects, and contractors are advised to develop a realistic time schedule for the entire project. (MLF)

  7. Schedule Risk Assessment

    NASA Technical Reports Server (NTRS)

    Smith, Greg

    2003-01-01

    Schedule Risk Assessment needs to determine the probability of finishing on or before a given point in time. Task in a schedule should reflect the "most likely" duration for each task. IN reality, each task is different and has a varying degree of probability of finishing within or after the duration specified. Schedule risk assessment attempt to quantify these probabilities by assigning values to each task. Bridges the gap between CPM scheduling and the project's need to know the likelihood of "when".

  8. Reinforcement learning in scheduling

    NASA Technical Reports Server (NTRS)

    Dietterich, Tom G.; Ok, Dokyeong; Zhang, Wei; Tadepalli, Prasad

    1994-01-01

    The goal of this research is to apply reinforcement learning methods to real-world problems like scheduling. In this preliminary paper, we show that learning to solve scheduling problems such as the Space Shuttle Payload Processing and the Automatic Guided Vehicle (AGV) scheduling can be usefully studied in the reinforcement learning framework. We discuss some of the special challenges posed by the scheduling domain to these methods and propose some possible solutions we plan to implement.

  9. Web Publishing Schedule

    EPA Pesticide Factsheets

    Section 207(f)(2) of the E-Gov Act requires federal agencies to develop an inventory and establish a schedule of information to be published on their Web sites, make those schedules available for public comment. To post the schedules on the web site.

  10. DSN Scheduling Engine

    NASA Technical Reports Server (NTRS)

    Clement, Bradley; Johnston, Mark; Wax, Allan; Chouinard, Caroline

    2008-01-01

    The DSN (Deep Space Network) Scheduling Engine targets all space missions that use DSN services. It allows clients to issue scheduling, conflict identification, conflict resolution, and status requests in XML over a Java Message Service interface. The scheduling requests may include new requirements that represent a set of tracks to be scheduled under some constraints. This program uses a heuristic local search to schedule a variety of schedule requirements, and is being infused into the Service Scheduling Assembly, a mixed-initiative scheduling application. The engine resolves conflicting schedules of resource allocation according to a range of existing and possible requirement specifications, including optional antennas; start of track and track duration ranges; periodic tracks; locks on track start, duration, and allocated antenna; MSPA (multiple spacecraft per aperture); arraying/VLBI (very long baseline interferometry)/delta DOR (differential one-way ranging); continuous tracks; segmented tracks; gap-to-track ratio; and override or block-out of requirements. The scheduling models now include conflict identification for SOA(start of activity), BOT (beginning of track), RFI (radio frequency interference), and equipment constraints. This software will search through all possible allocations while providing a best-effort solution at any time. The engine reschedules to accommodate individual emergency tracks in 0.2 second, and emergency antenna downtime in 0.2 second. The software handles doubling of one mission's track requests over one week (to 42 total) in 2.7 seconds. Further tests will be performed in the context of actual schedules.

  11. NASA scheduling technologies

    NASA Technical Reports Server (NTRS)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  12. Schedule-Organizer Computer Program

    NASA Technical Reports Server (NTRS)

    Collazo, Fernando F.

    1990-01-01

    Schedule Organizer provides simple method for generating distribution lists. Contains readers' names for each task schedule defined by input files. Schedule Organizer (SO), Schedule Tracker (ST) (COSMIC program MSC-21526), and Schedule Report Generator (SRG) (COSMIC program MSC-21527) computer programs manipulating data-base files in ways advantageous in scheduling. Written in PL/1 and DEC Command Language (DCL).

  13. Integrated resource scheduling in a distributed scheduling environment

    NASA Technical Reports Server (NTRS)

    Zoch, David; Hall, Gardiner

    1988-01-01

    The Space Station era presents a highly-complex multi-mission planning and scheduling environment exercised over a highly distributed system. In order to automate the scheduling process, customers require a mechanism for communicating their scheduling requirements to NASA. A request language that a remotely-located customer can use to specify his scheduling requirements to a NASA scheduler, thus automating the customer-scheduler interface, is described. This notation, Flexible Envelope-Request Notation (FERN), allows the user to completely specify his scheduling requirements such as resource usage, temporal constraints, and scheduling preferences and options. The FERN also contains mechanisms for representing schedule and resource availability information, which are used in the inter-scheduler inconsistency resolution process. Additionally, a scheduler is described that can accept these requests, process them, generate schedules, and return schedule and resource availability information to the requester. The Request-Oriented Scheduling Engine (ROSE) was designed to function either as an independent scheduler or as a scheduling element in a network of schedulers. When used in a network of schedulers, each ROSE communicates schedule and resource usage information to other schedulers via the FERN notation, enabling inconsistencies to be resolved between schedulers. Individual ROSE schedules are created by viewing the problem as a constraint satisfaction problem with a heuristically guided search strategy.

  14. Integrated resource scheduling in a distributed scheduling environment

    NASA Technical Reports Server (NTRS)

    Zoch, David; Hall, Gardiner

    1988-01-01

    The Space Station era presents a highly-complex multi-mission planning and scheduling environment exercised over a highly distributed system. In order to automate the scheduling process, customers require a mechanism for communicating their scheduling requirements to NASA. A request language that a remotely-located customer can use to specify his scheduling requirements to a NASA scheduler, thus automating the customer-scheduler interface, is described. This notation, Flexible Envelope-Request Notation (FERN), allows the user to completely specify his scheduling requirements such as resource usage, temporal constraints, and scheduling preferences and options. The FERN also contains mechanisms for representing schedule and resource availability information, which are used in the inter-scheduler inconsistency resolution process. Additionally, a scheduler is described that can accept these requests, process them, generate schedules, and return schedule and resource availability information to the requester. The Request-Oriented Scheduling Engine (ROSE) was designed to function either as an independent scheduler or as a scheduling element in a network of schedulers. When used in a network of schedulers, each ROSE communicates schedule and resource usage information to other schedulers via the FERN notation, enabling inconsistencies to be resolved between schedulers. Individual ROSE schedules are created by viewing the problem as a constraint satisfaction problem with a heuristically guided search strategy.

  15. Automated telescope scheduling

    NASA Astrophysics Data System (ADS)

    Johnston, Mark D.

    1988-08-01

    With the ever increasing level of automation of astronomical telescopes the benefits and feasibility of automated planning and scheduling are becoming more apparent. Improved efficiency and increased overall telescope utilization are the most obvious goals. Automated scheduling at some level has been done for several satellite observatories, but the requirements on these systems were much less stringent than on modern ground or satellite observatories. The scheduling problem is particularly acute for Hubble Space Telescope: virtually all observations must be planned in excruciating detail weeks to months in advance. Space Telescope Science Institute has recently made significant progress on the scheduling problem by exploiting state-of-the-art artificial intelligence software technology. What is especially interesting is that this effort has already yielded software that is well suited to scheduling groundbased telescopes, including the problem of optimizing the coordinated scheduling of more than one telescope.

  16. Automated telescope scheduling

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.

    1988-01-01

    With the ever increasing level of automation of astronomical telescopes the benefits and feasibility of automated planning and scheduling are becoming more apparent. Improved efficiency and increased overall telescope utilization are the most obvious goals. Automated scheduling at some level has been done for several satellite observatories, but the requirements on these systems were much less stringent than on modern ground or satellite observatories. The scheduling problem is particularly acute for Hubble Space Telescope: virtually all observations must be planned in excruciating detail weeks to months in advance. Space Telescope Science Institute has recently made significant progress on the scheduling problem by exploiting state-of-the-art artificial intelligence software technology. What is especially interesting is that this effort has already yielded software that is well suited to scheduling groundbased telescopes, including the problem of optimizing the coordinated scheduling of more than one telescope.

  17. Optimal outpatient appointment scheduling.

    PubMed

    Kaandorp, Guido C; Koole, Ger

    2007-09-01

    In this paper optimal outpatient appointment scheduling is studied. A local search procedure is derived that converges to the optimal schedule with a weighted average of expected waiting times of patients, idle time of the doctor and tardiness (lateness) as objective. No-shows are allowed to happen. For certain combinations of parameters the well-known Bailey-Welch rule is found to be the optimal appointment schedule.

  18. Operational VGOS Scheduling

    NASA Astrophysics Data System (ADS)

    Searle, Anthony; Petrachenko, Bill

    2016-12-01

    The VLBI Global Observing System (VGOS) has been designed to take advantage of advances in data recording speeds and storage capacity, allowing for smaller and faster antennas, wider bandwidths, and shorter observation durations. Here, schedules for a ``realistic" VGOS network, frequency sequences, and expanded source lists are presented using a new source-based scheduling algorithm. The VGOS aim for continuous observations presents new operational challenges. As the source-based strategy is independent of the observing network, there are operational advantages which allow for more flexible scheduling of continuous VLBI observations. Using VieVS, simulations of several schedules are presented and compared with previous VGOS studies.

  19. Scheduling: Seven Period Day

    ERIC Educational Resources Information Center

    Williamson, Ronald

    2010-01-01

    Driven by stable or declining financial resources many school districts are considering the costs and benefits of a seven-period day. While there is limited evidence that any particular scheduling model has a greater impact on student learning than any other, it is clear that the school schedule is a tool that can significantly impact teacher…

  20. Alternative Work Schedules: Definitions

    ERIC Educational Resources Information Center

    Journal of the College and University Personnel Association, 1977

    1977-01-01

    The term "alternative work schedules" encompasses any variation of the requirement that all permanent employees in an organization or one shift of employees adhere to the same five-day, seven-to-eight-hour schedule. This article defines staggered hours, flexible working hours (flexitour and gliding time), compressed work week, the task system, and…

  1. Accelerated immunotherapy schedules.

    PubMed

    Calabria, Christopher W

    2013-08-01

    Rush and cluster immunotherapy schedules are accelerated immunotherapy build-up schedules. A cluster immunotherapy schedule involves the patient receiving several allergen injections (generally 2-4) sequentially in a single day of treatment on nonconsecutive days. The maintenance dose is generally reached in 4-8 weeks. In rush immunotherapy protocols, higher doses are administered at 15- to 60-min intervals over a 1- to 3-day period until the maintenance dose is achieved. This review will serve as an update for accelerated immunotherapy schedules. The review will include recent investigations demonstrating the safety of cluster schedules in atopic dermatitis, pediatric patients, and inhalant allergen mixtures and an accelerated protocol utilizing an infusion pump for allergen delivery. There has also been further elucidation on the immunological changes which occur during accelerated immunotherapy. Finally, new studies analyzing systemic reaction risk factors are discussed.

  2. DSN Resource Scheduling

    NASA Technical Reports Server (NTRS)

    Wang, Yeou-Fang; Baldwin, John

    2007-01-01

    TIGRAS is client-side software, which provides tracking-station equipment planning, allocation, and scheduling services to the DSMS (Deep Space Mission System). TIGRAS provides functions for schedulers to coordinate the DSN (Deep Space Network) antenna usage time and to resolve the resource usage conflicts among tracking passes, antenna calibrations, maintenance, and system testing activities. TIGRAS provides a fully integrated multi-pane graphical user interface for all scheduling operations. This is a great improvement over the legacy VAX VMS command line user interface. TIGRAS has the capability to handle all DSN resource scheduling aspects from long-range to real time. TIGRAS assists NASA mission operations for DSN tracking of station equipment resource request processes from long-range load forecasts (ten years or longer), to midrange, short-range, and real-time (less than one week) emergency tracking plan changes. TIGRAS can be operated by NASA mission operations worldwide to make schedule requests for the DSN station equipment.

  3. NASA Schedule Management Handbook

    NASA Technical Reports Server (NTRS)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  4. Computerizing the Reference Desk Schedule.

    ERIC Educational Resources Information Center

    deHaas, Pat

    1983-01-01

    Discussion of the scheduling procedures of librarians' hours at the reference desk at the Rutherford Humanities and Social Sciences Library, University of Alberta, highlights services provided, the preference table system, and manual scheduling versus computer scheduling. (EJS)

  5. Registration Review Schedules

    EPA Pesticide Factsheets

    This schedule indicates plans for completion of risk assessments, proposed interim decisions and interim decisions for pesticides in the Registration Review program, EPA reviews all registered pesticides at least every 15 years as required by FIFRA.

  6. Childhood Vaccine Schedule

    MedlinePlus

    ... Navigation Bar Home Current Issue Past Issues Childhood Vaccine Schedule Past Issues / Spring 2008 Table of Contents ... please turn Javascript on. When to Vaccinate What Vaccine Why Birth (or any age if not previously ...

  7. Distributed network scheduling

    NASA Technical Reports Server (NTRS)

    Clement, Bradley J.; Schaffer, Steven R.

    2004-01-01

    Distributed Network Scheduling is the scheduling of future communications of a network by nodes in the network. This report details software for doing this onboard spacecraft in a remote network. While prior work on distributed scheduling has been applied to remote spacecraft networks, the software reported here focuses on modeling communication activities in greater detail and including quality of service constraints. Our main results are based on a Mars network of spacecraft and include identifying a maximum opportunity of improving traverse exploration rate a factor of three; a simulation showing reduction in one-way delivery times from a rover to Earth from as much as 5 to 1.5 hours; simulated response to unexpected events averaging under an hour onboard; and ground schedule generation ranging from seconds to 50 minutes for 15 to 100 communication goals.

  8. Initial Hardware Development Schedule

    NASA Technical Reports Server (NTRS)

    Culpepper, William X.

    1991-01-01

    The hardware development schedule for the Common Lunar Lander's (CLLs) tracking system is presented. Among the topics covered are the following: historical perspective, solution options, industry contacts, and the rationale for selection.

  9. Pushing schedule derivation method

    SciTech Connect

    Henriquez, B.

    1996-12-31

    The development of a Pushing Schedule Derivation Method has allowed the company to sustain the maximum production rate at CSH`s Coke Oven Battery, in spite of having single set oven machinery with a high failure index as well as a heat top tendency. The stated method provides for scheduled downtime of up to two hours for machinery maintenance purposes, periods of empty ovens for decarbonization and production loss recovery capability, while observing lower limits and uniformity of coking time.

  10. Affirmative Action: The Scheduled Castes and the Scheduled Tribes.

    ERIC Educational Resources Information Center

    Sivaramayya, B.

    This paper considers Indian affirmative action policies that provide reservations (quotas) in favor of two disadvantaged groups, the scheduled castes and the scheduled tribes. First, definitions and background are presented. The scheduled castes ("untouchables") are said to suffer from social segregation, and the scheduled tribes from…

  11. The Stanford School Scheduling System.

    ERIC Educational Resources Information Center

    Stanford Univ., CA. Dept. of Industrial Engineering.

    This booklet gives a general overview of the computerized Stanford School Scheduling System (SSSS) which is designed to make scheduling less difficult for individualized programs in secondary education. Topics covered include new flexible scheduling and variable course structure designs in secondary education, the school scheduling problem,…

  12. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1991-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocations for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its applications to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  13. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1991-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  14. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  15. Automated Scheduling Via Artificial Intelligence

    NASA Technical Reports Server (NTRS)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  16. Automated Scheduling Via Artificial Intelligence

    NASA Technical Reports Server (NTRS)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  17. Schedule-Tracker Computer Program

    NASA Technical Reports Server (NTRS)

    Collazo, Fernando F.

    1990-01-01

    Schedule Tracker provides effective method for tracking tasks "past due" and/or "near term". Generates reports for each responsible staff member having one or more assigned tasks falling within two listed categories. Schedule Organizer (SO) (COSMIC program MSC-21525), Schedule Tracker (ST), and Schedule Report Generator (SRG) (COSMIC program MSC-21527) computer programs manipulating data-base files in ways advantageous in scheduling. Written in PL/1 and DEC Command Language (DCL).

  18. Are accidents scheduled. [safety management problems

    NASA Technical Reports Server (NTRS)

    Childs, C.

    1976-01-01

    Two major sets of safety problems associated with project scheduling are examined. The first set involves problems resulting from the improper scheduling of the safety tasks. The second involves problems which result from inadequate attention to scheduling of those project tasks which lead to tests and operations and includes condensed schedules, modified schedules, schedule workarounds, eliminated portions of the schedules and strung out schedules.

  19. Scheduling with genetic algorithms

    NASA Technical Reports Server (NTRS)

    Fennel, Theron R.; Underbrink, A. J., Jr.; Williams, George P. W., Jr.

    1994-01-01

    In many domains, scheduling a sequence of jobs is an important function contributing to the overall efficiency of the operation. At Boeing, we develop schedules for many different domains, including assembly of military and commercial aircraft, weapons systems, and space vehicles. Boeing is under contract to develop scheduling systems for the Space Station Payload Planning System (PPS) and Payload Operations and Integration Center (POIC). These applications require that we respect certain sequencing restrictions among the jobs to be scheduled while at the same time assigning resources to the jobs. We call this general problem scheduling and resource allocation. Genetic algorithms (GA's) offer a search method that uses a population of solutions and benefits from intrinsic parallelism to search the problem space rapidly, producing near-optimal solutions. Good intermediate solutions are probabalistically recombined to produce better offspring (based upon some application specific measure of solution fitness, e.g., minimum flowtime, or schedule completeness). Also, at any point in the search, any intermediate solution can be accepted as a final solution; allowing the search to proceed longer usually produces a better solution while terminating the search at virtually any time may yield an acceptable solution. Many processes are constrained by restrictions of sequence among the individual jobs. For a specific job, other jobs must be completed beforehand. While there are obviously many other constraints on processes, it is these on which we focussed for this research: how to allocate crews to jobs while satisfying job precedence requirements and personnel, and tooling and fixture (or, more generally, resource) requirements.

  20. Intelligent retail logistics scheduling

    SciTech Connect

    Rowe, J.; Jewers, K.; Codd, A.; Alcock, A.

    1996-12-31

    The Supply Chain Integrated Ordering Network (SCION) Depot Bookings system automates the planning and scheduling of perishable and non-perishable commodities and the vehicles that carry them into J. Sainsbury depots. This is a strategic initiative, enabling the business to make the key move from weekly to daily ordering. The system is mission critical, managing the inwards flow of commodities from suppliers into J. Sainsbury`s depots. The system leverages Al techniques to provide a business solution that meets challenging functional and performance needs. The SCION Depot Bookings system is operational providing schedules for 22 depots across the UK.

  1. CMS multicore scheduling strategy

    SciTech Connect

    Perez-Calero Yzquierdo, Antonio; Hernandez, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  2. Schedule-Induced Stereotypy.

    ERIC Educational Resources Information Center

    Emerson, Eric; Howard, Denise

    1992-01-01

    The phenomena of the induction and entrainment of adjunctive behaviors was investigated in 8 people (ages 5-51) with severe or profound mental retardation who exhibited stereotypic behaviors. Seven of the eight demonstrated evidence of schedule-induced stereotypic behavior, whereas five also showed evidence of the entrainment of these behaviors by…

  3. Optimizing Observation Scheduling Objectives

    NASA Technical Reports Server (NTRS)

    Bresina, John L.; Morris, Robert A.; Edgington, William R.

    1997-01-01

    In this paper, we present an approach that enables the automatic generation of high quality schedules, with respect to a given objective function. The approach involves the combination of two techniques: GenH, which automatically generates a search heuristic specialized to the given problem instance, and HBSS, which employs the generated heuristic as a bias within a stochastic sampling method.

  4. "Creative" Work Schedules.

    ERIC Educational Resources Information Center

    Blai, Boris

    Many creative or flexible work scheduling options are becoming available to the many working parents, students, handicapped persons, elderly individuals, and others who are either unable or unwilling to work a customary 40-hour work week. These options may be broadly categorized as either restructured or reduced work time options. The three main…

  5. Parent Interview Schedule.

    ERIC Educational Resources Information Center

    Purdue Univ., Lafayette, IN. Educational Research Center.

    This 116-item interview schedule designed for parents who failed to respond to the Questionnaire for Parents, is individually administered to the mother of the child of elementary school age. It consists of scales measuring 14 parent variables plus a section devoted to demographic variables: (1) parent's achievement aspirations for the child, (2)…

  6. "Creative" Work Schedules.

    ERIC Educational Resources Information Center

    Blai, Boris

    Many creative or flexible work scheduling options are becoming available to the many working parents, students, handicapped persons, elderly individuals, and others who are either unable or unwilling to work a customary 40-hour work week. These options may be broadly categorized as either restructured or reduced work time options. The three main…

  7. Scheduling Advisory. Research Brief

    ERIC Educational Resources Information Center

    Muir, Mike

    2005-01-01

    More and more high schools are implementing Advisory programs for a variety of reasons: personalization, academics & study skills, life success skills, self-knowledge, addressing the concern about students feeling "lost" in the high school setting, first line of contact for the parents, and portfolios. But finding a way to schedule advisory can…

  8. Scheduling THE Computer.

    ERIC Educational Resources Information Center

    McKay, Martin D.

    1998-01-01

    Focuses on how to schedule the use of a single computer so that all students are represented and given equal access. Suggests that a computer management team be selected from within the class; discusses the teacher's role and student role definition and responsibility assignments. (AEF)

  9. Prescribing Schedule 8 drugs.

    PubMed

    Bird, Sara

    2006-01-01

    Case histories are based on actual medical negligence cases, however certain facts have been omitted or changed by the author to ensure the anonymity of the parties involved. This article examines a general practitioner's legal obligations when prescribing Schedule 8 drugs (drugs of addiction), with particular emphasis on dealing with patients who are drug dependent.

  10. Round Robin Schedules.

    ERIC Educational Resources Information Center

    Iannone, Michael A.

    1983-01-01

    Presented is a computer program written in BASIC that covers round-robin schedules for team matches in competitions. The program was originally created to help teams in a tennis league play one match against every other team. Part of the creation of the program involved use of modulo arithmetic. (MP)

  11. Completable scheduling: An integrated approach to planning and scheduling

    NASA Technical Reports Server (NTRS)

    Gervasio, Melinda T.; Dejong, Gerald F.

    1992-01-01

    The planning problem has traditionally been treated separately from the scheduling problem. However, as more realistic domains are tackled, it becomes evident that the problem of deciding on an ordered set of tasks to achieve a set of goals cannot be treated independently of the problem of actually allocating resources to the tasks. Doing so would result in losing the robustness and flexibility needed to deal with imperfectly modeled domains. Completable scheduling is an approach which integrates the two problems by allowing an a priori planning module to defer particular planning decisions, and consequently the associated scheduling decisions, until execution time. This allows a completable scheduling system to maximize plan flexibility by allowing runtime information to be taken into consideration when making planning and scheduling decision. Furthermore, through the criteria of achievability placed on deferred decision, a completable scheduling system is able to retain much of the goal-directedness and guarantees of achievement afforded by a priori planning. The completable scheduling approach is further enhanced by the use of contingent explanation-based learning, which enables a completable scheduling system to learn general completable plans from example and improve its performance through experience. Initial experimental results show that completable scheduling outperforms classical scheduling as well as pure reactive scheduling in a simple scheduling domain.

  12. Block Schedule and Traditional Schedule Achievement: A Comparison

    ERIC Educational Resources Information Center

    Arnold, Douglas E.

    2002-01-01

    Block scheduling constitutes one of the major types of restructuring considered by school administrators seeking to improve student performance. The relationship between two school schedules--the seven-period A/B block and the seven-period traditional schedule--and achievement of students in grade 11 was examined. Comparisons showed no significant…

  13. Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

    NASA Technical Reports Server (NTRS)

    Zoch, David R.

    1991-01-01

    Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

  14. Explanation of Registration Review Schedule

    EPA Pesticide Factsheets

    Updated information on EPA's schedule for opening dockets to begin pesticide registration reviews during the next several years. The schedule is subdivided into conventional pesticides, antimicrobials, biochemicals, and microbials.

  15. Registration Review Docket Opening Schedule

    EPA Pesticide Factsheets

    Dockets are opened on a fiscal year schedule for reevaluation of all pesticides. They are subdivided into conventional pesticides, antimicrobials, biochemicals, and microbials. The schedules for 2014 to 2017 are attached.

  16. Methodologies for building robust schedules

    NASA Technical Reports Server (NTRS)

    Dean, John H.

    1992-01-01

    COMPASS is the name of a Computer Aided Scheduling System designed and built for NASA. COMPASS can be used to develop schedule of activities based upon the temporal relationships of the activities and their resource requirements. COMPASS uses this information, and guided by the user, develops precise start and stop times for the activities. In actual practice however, it is impossible to know with complete certainty what the actual durations of the scheduled activities will really be. The best that one can hope for is knowledge of the probability distribution for the durations. This paper investigates methodologies for using a scheduling tool like COMPASS that is based upon definite values for the resource requirements, while building schedules that remain valid in the face of the schedule execution perturbations. Representations for the schedules developed by these methodologies are presented, along with a discussion of the algorithm that could be used by a computer onboard a spacecraft to efficiently monitor and execute these schedules.

  17. Revisiting conjugate schedules.

    PubMed

    MacAleese, Kenneth R; Ghezzi, Patrick M; Rapp, John T

    2015-07-01

    The effects of conjugate reinforcement on the responding of 13 college students were examined in three experiments. Conjugate reinforcement was provided via key presses that changed the clarity of pictures displayed on a computer monitor in a manner proportional to the rate of responding. Experiment 1, which included seven parameters of clarity change per response, revealed that responding decreased as the percentage clarity per response increased for all five participants. These results indicate that each participant's responding was sensitive to intensity change, which is a parameter of conjugate reinforcement schedules. Experiment 2 showed that responding increased during conjugate reinforcement phases and decreased during extinction phases for all four participants. Experiment 3 also showed that responding increased during conjugate reinforcement and further showed that responding decreased during a conjugate negative punishment condition for another four participants. Directions for future research with conjugate schedules are briefly discussed.

  18. Observation Scheduling System

    NASA Technical Reports Server (NTRS)

    Chien, Steve A.; Tran, Daniel Q.; Rabideau, Gregg R.; Schaffer, Steven R.

    2011-01-01

    Software has been designed to schedule remote sensing with the Earth Observing One spacecraft. The software attempts to satisfy as many observation requests as possible considering each against spacecraft operation constraints such as data volume, thermal, pointing maneuvers, and others. More complex constraints such as temperature are approximated to enable efficient reasoning while keeping the spacecraft within safe limits. Other constraints are checked using an external software library. For example, an attitude control library is used to determine the feasibility of maneuvering between pairs of observations. This innovation can deal with a wide range of spacecraft constraints and solve large scale scheduling problems like hundreds of observations and thousands of combinations of observation sequences.

  19. SARDA Surface Schedulers

    NASA Technical Reports Server (NTRS)

    Malik, Waqar

    2016-01-01

    Provide an overview of algorithms used in SARDA (Spot and Runway Departure Advisor) HITL (Human-in-the-Loop) simulation for Dallas Fort-Worth International Airport and Charlotte Douglas International airport. Outline a multi-objective dynamic programming (DP) based algorithm that finds the exact solution to the single runway scheduling (SRS) problem, and discuss heuristics to restrict the search space for the DP based algorithm and provide improvements.

  20. State-based scheduling: An architecture for telescope observation scheduling

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Smith, Stephen F.

    1989-01-01

    The applicability of constraint-based scheduling, a methodology previously developed and validated in the domain of factory scheduling, is extended to problem domains that require attendance to a wider range of state-dependent constraints. The problem of constructing and maintaining a short-term observation schedule for the Hubble Space Telescope (HST), which typifies this type of domain is the focus of interest. The nature of the constraints encountered in the HST domain is examined, system requirements are discussed with respect to utilization of a constraint-based scheduling methodology in such domains, and a general framework for state-based scheduling is presented.

  1. Computational Simulation for Decision of Scheduling Period in Reactive Scheduling

    NASA Astrophysics Data System (ADS)

    Sakaguchi, Tatsuhiko; Kamimura, Toshihide; Shirase, Keiichi

    Unexpected disruptions often occur in the manufacturing systems. The manufacturing systems cannot execute the manufacturing operations in accordance with the predetermined production schedule due to such disruptions. Therefore, a systematic scheduling method is required to cope with such disruptions. In this research, distribution of processing time is described with the normal distribution. The reactive scheduling method for distribution of processing time is proposed in order to modify the predetermined production schedule. And the suitable re-scheduling period is considered through the computational experiments.

  2. FlexMod Scheduling Redux

    ERIC Educational Resources Information Center

    Murray, Shannon

    2008-01-01

    Flexible modular scheduling (flex mod)--a schedule philosophy and system that has been in place at Wausau West High School in Wausau, Wisconsin, for the last 35 years and aligns nicely with current research on student learning--is getting more and more attention from high school administrators across the country. Flexible modular scheduling was…

  3. FlexMod Scheduling Redux

    ERIC Educational Resources Information Center

    Murray, Shannon

    2008-01-01

    Flexible modular scheduling (flex mod)--a schedule philosophy and system that has been in place at Wausau West High School in Wausau, Wisconsin, for the last 35 years and aligns nicely with current research on student learning--is getting more and more attention from high school administrators across the country. Flexible modular scheduling was…

  4. Conflict-Aware Scheduling Algorithm

    NASA Technical Reports Server (NTRS)

    Wang, Yeou-Fang; Borden, Chester

    2006-01-01

    conflict-aware scheduling algorithm is being developed to help automate the allocation of NASA s Deep Space Network (DSN) antennas and equipment that are used to communicate with interplanetary scientific spacecraft. The current approach for scheduling DSN ground resources seeks to provide an equitable distribution of tracking services among the multiple scientific missions and is very labor intensive. Due to the large (and increasing) number of mission requests for DSN services, combined with technical and geometric constraints, the DSN is highly oversubscribed. To help automate the process, and reduce the DSN and spaceflight project labor effort required for initiating, maintaining, and negotiating schedules, a new scheduling algorithm is being developed. The scheduling algorithm generates a "conflict-aware" schedule, where all requests are scheduled based on a dynamic priority scheme. The conflict-aware scheduling algorithm allocates all requests for DSN tracking services while identifying and maintaining the conflicts to facilitate collaboration and negotiation between spaceflight missions. These contrast with traditional "conflict-free" scheduling algorithms that assign tracks that are not in conflict and mark the remainder as unscheduled. In the case where full schedule automation is desired (based on mission/event priorities, fairness, allocation rules, geometric constraints, and ground system capabilities/ constraints), a conflict-free schedule can easily be created from the conflict-aware schedule by removing lower priority items that are in conflict.

  5. Surprise Benefits of Arena Scheduling

    ERIC Educational Resources Information Center

    Surloff, Andrew

    2008-01-01

    One of the most challenging tasks a principal must accomplish every year is the construction of the master schedule. Free from the magnetic scheduling boards and wall charts of yesteryear, principals now have technological tools--such as programs that offer schools solutions for their scheduling needs--that can save time and enable them to work…

  6. Rural Inservice Using Alternate Scheduling.

    ERIC Educational Resources Information Center

    Kimmet, James L.

    Three small rural school districts in Montana and Wyoming used alternate school day scheduling to make time for staff and curriculum development inservice programs. The schedule of one short and four long days delivered the instructional time of 175 6-hour days each year. Benefits of alternate scheduling included time for regular inservice…

  7. Flexible Scheduling: Making the Transition

    ERIC Educational Resources Information Center

    Creighton, Peggy Milam

    2008-01-01

    Citing literature that supports the benefits of flexible scheduling on student achievement, the author exhorts readers to campaign for flexible scheduling in their library media centers. She suggests tips drawn from the work of Graziano (2002), McGregor (2006) and Stripling (1997) for making a smooth transition from fixed to flexible scheduling:…

  8. Surprise Benefits of Arena Scheduling

    ERIC Educational Resources Information Center

    Surloff, Andrew

    2008-01-01

    One of the most challenging tasks a principal must accomplish every year is the construction of the master schedule. Free from the magnetic scheduling boards and wall charts of yesteryear, principals now have technological tools--such as programs that offer schools solutions for their scheduling needs--that can save time and enable them to work…

  9. Automation Improves Schedule Quality and Increases Scheduling Efficiency for Residents

    PubMed Central

    Perelstein, Elizabeth; Rose, Ariella; Hong, Young-Chae; Cohn, Amy; Long, Micah T.

    2016-01-01

    Background Medical resident scheduling is difficult due to multiple rules, competing educational goals, and ever-evolving graduate medical education requirements. Despite this, schedules are typically created manually, consuming hours of work, producing schedules of varying quality, and yielding negative consequences for resident morale and learning. Objective To determine whether computerized decision support can improve the construction of residency schedules, saving time and improving schedule quality. Methods The Optimized Residency Scheduling Assistant was designed by a team from the University of Michigan Department of Industrial and Operations Engineering. It was implemented in the C.S. Mott Children's Hospital Pediatric Emergency Department in the 2012–2013 academic year. The 4 metrics of schedule quality that were compared between the 2010–2011 and 2012–2013 academic years were the incidence of challenging shift transitions, the incidence of shifts following continuity clinics, the total shift inequity, and the night shift inequity. Results All scheduling rules were successfully incorporated. Average schedule creation time fell from 22 to 28 hours to 4 to 6 hours per month, and 3 of 4 metrics of schedule quality significantly improved. For the implementation year, the incidence of challenging shift transitions decreased from 83 to 14 (P < .01); the incidence of postclinic shifts decreased from 72 to 32 (P < .01); and the SD of night shifts dropped by 55.6% (P < .01). Conclusions This automated shift scheduling system improves the current manual scheduling process, reducing time spent and improving schedule quality. Embracing such automated tools can benefit residency programs with shift-based scheduling needs. PMID:26913102

  10. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... Items), Schedule L (Balance Sheets per Books), Schedule M-1 (Reconciliation of Income (Loss) per Books.... (Schedule K-1), Balance Sheets per Books (Schedule L), Reconciliation of Income (Loss) per Books With Income...

  11. SO - SCHEDULE ORGANIZER COMPUTER PROGRAM

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer SO, Schedule Tracker, ST (COSMIC Program MSC-21526), and Report Generator, SRG (COSMIC Program MSC-21527), are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Tracker provides an effective method for tracking tasks that are 'past due' and/or 'near term'. ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are scheduled for recent completion (near term). Schedule Report Generator provides a simple method for generating periodic schedule reports. SO contains the following primary menu that is displayed at the beginning of the program. The menu provides options: to write input files to an output distribution file, to change a schedule title field and/or distribution list field, to browse through the schedule and input names file for requested schedule numbers, to create an input names file and a schedule titles file, and to delete input schedule titles and associated names. SO provides a choice of two input files. One file holds twenty-five groups of up to twenty-five names for each group. The other file holds twenty-five records, each of which may hold a task schedule title. SO creates three output files. One holds the formatted list of schedule titles for printout. Another file holds the formatted distribution list for printout; there is one for each input names file schedule group. The third output file holds the last schedule title deleted by

  12. SO - SCHEDULE ORGANIZER COMPUTER PROGRAM

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer SO, Schedule Tracker, ST (COSMIC Program MSC-21526), and Report Generator, SRG (COSMIC Program MSC-21527), are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Tracker provides an effective method for tracking tasks that are 'past due' and/or 'near term'. ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are scheduled for recent completion (near term). Schedule Report Generator provides a simple method for generating periodic schedule reports. SO contains the following primary menu that is displayed at the beginning of the program. The menu provides options: to write input files to an output distribution file, to change a schedule title field and/or distribution list field, to browse through the schedule and input names file for requested schedule numbers, to create an input names file and a schedule titles file, and to delete input schedule titles and associated names. SO provides a choice of two input files. One file holds twenty-five groups of up to twenty-five names for each group. The other file holds twenty-five records, each of which may hold a task schedule title. SO creates three output files. One holds the formatted list of schedule titles for printout. Another file holds the formatted distribution list for printout; there is one for each input names file schedule group. The third output file holds the last schedule title deleted by

  13. Parallel job-scheduling algorithms

    SciTech Connect

    Rodger, S.H.

    1989-01-01

    In this thesis, we consider solving job scheduling problems on the CREW PRAM model. We show how to adapt Cole's pipeline merge technique to yield several efficient parallel algorithms for a number of job scheduling problems and one optimal parallel algorithm for the following job scheduling problem: Given a set of n jobs defined by release times, deadlines and processing times, find a schedule that minimizes the maximum lateness of the jobs and allows preemption when the jobs are scheduled to run on one machine. In addition, we present the first NC algorithm for the following job scheduling problem: Given a set of n jobs defined by release times, deadlines and unit processing times, determine if there is a schedule of jobs on one machine, and calculate the schedule if it exists. We identify the notion of a canonical schedule, which is the type of schedule our algorithm computes if there is a schedule. Our algorithm runs in O((log n){sup 2}) time and uses O(n{sup 2}k{sup 2}) processors, where k is the minimum number of distinct offsets of release times or deadlines.

  14. Automated Platform Management System Scheduling

    NASA Technical Reports Server (NTRS)

    Hull, Larry G.

    1990-01-01

    The Platform Management System was established to coordinate the operation of platform systems and instruments. The management functions are split between ground and space components. Since platforms are to be out of contact with the ground more than the manned base, the on-board functions are required to be more autonomous than those of the manned base. Under this concept, automated replanning and rescheduling, including on-board real-time schedule maintenance and schedule repair, are required to effectively and efficiently meet Space Station Freedom mission goals. In a FY88 study, we developed several promising alternatives for automated platform planning and scheduling. We recommended both a specific alternative and a phased approach to automated platform resource scheduling. Our recommended alternative was based upon use of exactly the same scheduling engine in both ground and space components of the platform management system. Our phased approach recommendation was based upon evolutionary development of the platform. In the past year, we developed platform scheduler requirements and implemented a rapid prototype of a baseline platform scheduler. Presently we are rehosting this platform scheduler rapid prototype and integrating the scheduler prototype into two Goddard Space Flight Center testbeds, as the ground scheduler in the Scheduling Concepts, Architectures, and Networks Testbed and as the on-board scheduler in the Platform Management System Testbed. Using these testbeds, we will investigate rescheduling issues, evaluate operational performance and enhance the platform scheduler prototype to demonstrate our evolutionary approach to automated platform scheduling. The work described in this paper was performed prior to Space Station Freedom rephasing, transfer of platform responsibility to Code E, and other recently discussed changes. We neither speculate on these changes nor attempt to predict the impact of the final decisions. As a consequence some of our

  15. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    SciTech Connect

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  16. DTS: Building custom, intelligent schedulers

    NASA Technical Reports Server (NTRS)

    Hansson, Othar; Mayer, Andrew

    1994-01-01

    DTS is a decision-theoretic scheduler, built on top of a flexible toolkit -- this paper focuses on how the toolkit might be reused in future NASA mission schedulers. The toolkit includes a user-customizable scheduling interface, and a 'Just-For-You' optimization engine. The customizable interface is built on two metaphors: objects and dynamic graphs. Objects help to structure problem specifications and related data, while dynamic graphs simplify the specification of graphical schedule editors (such as Gantt charts). The interface can be used with any 'back-end' scheduler, through dynamically-loaded code, interprocess communication, or a shared database. The 'Just-For-You' optimization engine includes user-specific utility functions, automatically compiled heuristic evaluations, and a postprocessing facility for enforcing scheduling policies. The optimization engine is based on BPS, the Bayesian Problem-Solver (1,2), which introduced a similar approach to solving single-agent and adversarial graph search problems.

  17. ST - SCHEDULE TRACKER COMPUTER PROGRAM

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer, SO (COSMIC Program MSC-21525), Schedule Tracker, ST, and Schedule Report Generator, SRG (COSMIC Program MSC-21527), are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Tracker provides an effective method for tracking tasks that are 'past due' and/or 'near term'. ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are scheduled for recent completion (near term). Schedule Report Generator provides a simple method for generating periodic schedule reports. ST and SRG use the same data base file as input. The common data base file has a maximum number of 400 entries. The time span of all three programs is nineteen months. Both of these maximum numbers can be modified by the user. ST requires the VMS Operating System on DEC VAX and was written in PL/1 and DEC Command Language (DCL). The program requires a memory of 233KB. ST can be purchased separately or in a package (COSMIC Program COS-10021) containing SO, ST, and SRG. ST was developed in 1985.

  18. Effective Scheduling Using Sacred Time.

    PubMed

    Baum, Neil

    2016-01-01

    Doctors need to become more efficient in order to become more productive. One of the best ways to enhance efficiency is effective scheduling. Every practice has several urgencies or emergencies every day that have to be worked into the schedule, and these few additional patients can wreak havoc with the schedule. This article will discuss.how to use "sacred time" in order to enhance efficiency in the practice.

  19. ST - SCHEDULE TRACKER COMPUTER PROGRAM

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer, SO (COSMIC Program MSC-21525), Schedule Tracker, ST, and Schedule Report Generator, SRG (COSMIC Program MSC-21527), are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Tracker provides an effective method for tracking tasks that are 'past due' and/or 'near term'. ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are scheduled for recent completion (near term). Schedule Report Generator provides a simple method for generating periodic schedule reports. ST and SRG use the same data base file as input. The common data base file has a maximum number of 400 entries. The time span of all three programs is nineteen months. Both of these maximum numbers can be modified by the user. ST requires the VMS Operating System on DEC VAX and was written in PL/1 and DEC Command Language (DCL). The program requires a memory of 233KB. ST can be purchased separately or in a package (COSMIC Program COS-10021) containing SO, ST, and SRG. ST was developed in 1985.

  20. COMPASS: An Ada based scheduler

    NASA Technical Reports Server (NTRS)

    Mcmahon, Mary Beth; Culbert, Chris

    1992-01-01

    COMPASS is a generic scheduling system developed by McDonnell Douglas and funded by the Software Technology Branch of NASA Johnson Space Center. The motivation behind COMPASS is to illustrate scheduling technology and provide a basis from which custom scheduling systems can be built. COMPASS was written in Ada to promote readability and to conform to DOD standards. COMPASS has some unique characteristics that distinguishes it from commercial products. This paper discusses these characteristics and uses them to illustrate some differences between scheduling tools.

  1. 1993 Wholesale Power and Transmission Rate Schedules.

    SciTech Connect

    US Bonneville Power Administration

    1993-10-01

    Bonneville Power Administration 1993 Wholesale Power Rate Schedules and General Rate Schedule Provisions and 1993 Transmission Rate Schedules and General Transmission Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1993. These rate schedules and provisions were approved by the Federal Energy Commission, United States Department of Energy, in September, 1993. These rate schedules and provisions supersede the Administration`s Wholesale Power Rate Schedules and General Rate Schedule Provisions and Transmission Rate Schedules and General Transmission Rate Schedule Provisions effective October 1, 1991.

  2. Dynamics in scheduled networks

    NASA Astrophysics Data System (ADS)

    Zanin, Massimiliano; Lacasa, Lucas; Cea, Miguel

    2009-06-01

    When studying real or virtual systems through complex networks theories, usually time restrictions are neglected, and a static structure is defined to characterize which node is connected to which other. However, this approach is oversimplified, as real networks are indeed dynamically modified by external mechanisms. In order to bridge the gap, in this work we present a scheduled network formalism, which takes into account such dynamical modifications by including generic time restrictions in the structure of an extended adjacency matrix. We present some of its properties and apply this formalism to the specific case of the air transportation network in order to analyze its efficiency. Real data are used at this point. We finally discuss on the applicability of this formalism to other complex systems.

  3. Optimum connection management scheduling

    NASA Astrophysics Data System (ADS)

    Kadar, Ivan

    2000-08-01

    Connection Management plays a key role in both distributed 'local' network-centric and 'globally' connected info- centric systems. The role of Connection Management is to provide seamless demand-based sharing of the information products. For optimum distributed information fusion performance, these systems must minimize communications delays and maximize message throughput, and at the same time take into account relative-sensors-targets geometrical constraints and data pedigree. In order to achieve overall distributed 'network' effectiveness, these systems must be adaptive, and be able to distribute data s needed in real- time. A system concept will be described which provides optimum capacity-based information scheduling. A specific example, based on a satellite channel, is used to illustrate simulated performance results and their effects on fusion systems performance.

  4. Visually Exploring Transportation Schedules.

    PubMed

    Palomo, Cesar; Guo, Zhan; Silva, Cláudio T; Freire, Juliana

    2016-01-01

    Public transportation schedules are designed by agencies to optimize service quality under multiple constraints. However, real service usually deviates from the plan. Therefore, transportation analysts need to identify, compare and explain both eventual and systemic performance issues that must be addressed so that better timetables can be created. The purely statistical tools commonly used by analysts pose many difficulties due to the large number of attributes at trip- and station-level for planned and real service. Also challenging is the need for models at multiple scales to search for patterns at different times and stations, since analysts do not know exactly where or when relevant patterns might emerge and need to compute statistical summaries for multiple attributes at different granularities. To aid in this analysis, we worked in close collaboration with a transportation expert to design TR-EX, a visual exploration tool developed to identify, inspect and compare spatio-temporal patterns for planned and real transportation service. TR-EX combines two new visual encodings inspired by Marey's Train Schedule: Trips Explorer for trip-level analysis of frequency, deviation and speed; and Stops Explorer for station-level study of delay, wait time, reliability and performance deficiencies such as bunching. To tackle overplotting and to provide a robust representation for a large numbers of trips and stops at multiple scales, the system supports variable kernel bandwidths to achieve the level of detail required by users for different tasks. We justify our design decisions based on specific analysis needs of transportation analysts. We provide anecdotal evidence of the efficacy of TR-EX through a series of case studies that explore NYC subway service, which illustrate how TR-EX can be used to confirm hypotheses and derive new insights through visual exploration.

  5. Schedules of Controlled Substances: Temporary Placement of 4-Fluoroisobutyryl Fentanyl into Schedule I. Temporary scheduling order.

    PubMed

    2017-05-03

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioid, N-(4-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)isobutyramide (4-fluoroisobutyryl fentanyl or para-fluoroisobutyryl fentanyl), and its isomers, esters, ethers, salts and salts of isomers, esters, and ethers, into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of 4-fluoroisobutyryl fentanyl into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, 4-fluoroisobutyryl fentanyl.

  6. Job scheduling on a hypercube

    SciTech Connect

    Zhu, Yahui.

    1990-01-01

    The author studies the scheduling of independent jobs on hypercube multiprocessors. He assumes that the hypercube system supports space-sharing for multiprogramming, i.e., a hypercube is partitioned into subcubes and each job is assigned to a dedicated subcube and many jobs can be running simultaneously without interfering with each other. Then the problem of how to schedule a set of jobs so that they can be finished as early as possible becomes important. He investigates two kinds of scheduling algorithms for the problem. The first one is nonpreemptive scheduling, i.e., no job is allowed to be interrupted during its execution. In this case, the problem is NP-Complete. He proposes an approximation algorithm called LDF, which generates a schedule with a finish time less than twice that of an optimal schedule. Compared with the earlier proposed algorithm, his algorithm is simpler and has almost the same performance. More importantly, his LDF algorithm can achieve this performance without knowing the job processing times, which may be hard to obtain in practice. Also he proves a lower bound result which implies that it is unlikely to find simple heuristic algorithms that can perform much better than the existing algorithms including LDF. The second kind is preemptive scheduling, i.e., a job can be preempted during its execution and rescheduled later. He develops a feasibility algorithm that runs in O (n log n) time and generates a schedule with at most min{l brace}n-2, 2{sup m}-1{r brace} preemptions. It can generate a feasible schedule for the given job set if there exists one. This improvement is important because many scheduling algorithms depend on a feasibility algorithm as a building block. Furthermore, based on an advanced search technique, he presents an algorithm that can find the optimal schedule in O(n{sup 2} log {sup 2}n) time.

  7. Constraint-Based Scheduling System

    NASA Technical Reports Server (NTRS)

    Zweben, Monte; Eskey, Megan; Stock, Todd; Taylor, Will; Kanefsky, Bob; Drascher, Ellen; Deale, Michael; Daun, Brian; Davis, Gene

    1995-01-01

    Report describes continuing development of software for constraint-based scheduling system implemented eventually on massively parallel computer. Based on machine learning as means of improving scheduling. Designed to learn when to change search strategy by analyzing search progress and learning general conditions under which resource bottleneck occurs.

  8. Block Schedule: Breaking the Barriers.

    ERIC Educational Resources Information Center

    West, Mike

    As of 1996, Chaparral High School in Las Vegas, Nevada, was in the fourth year of a radical restructuring effort. The school changed from a 6-period day, composed of 51-minute periods, to an alternating day schedule, composed of 3 102-minute periods per day. This report describes how the school developed and implemented the new schedule. Faculty…

  9. Modeling the Cray memory scheduler

    SciTech Connect

    Wickham, K.L.; Litteer, G.L.

    1992-04-01

    This report documents the results of a project to evaluate low cost modeling and simulation tools when applied to modeling the Cray memory scheduler. The specific tool used is described and the basics of the memory scheduler are covered. Results of simulations using the model are discussed and a favorable recommendation is made to make more use of this inexpensive technology.

  10. Modeling the Cray memory scheduler

    SciTech Connect

    Wickham, K.L.; Litteer, G.L.

    1992-04-01

    This report documents the results of a project to evaluate low cost modeling and simulation tools when applied to modeling the Cray memory scheduler. The specific tool used is described and the basics of the memory scheduler are covered. Results of simulations using the model are discussed and a favorable recommendation is made to make more use of this inexpensive technology.

  11. Scheduling Guide for Program Managers

    DTIC Science & Technology

    2001-10-01

    and val- leys are evened out without scheduling more work than nine people can do. In this ex- ample, this rearrangement can be accom- plished quickly...full advantage of event- driven scheduling. Additional information on the development of IMSs can be found in various sections of the Defense

  12. Interactive computer aided shift scheduling.

    PubMed

    Gaertner, J

    2001-12-01

    This paper starts with a discussion of computer aided shift scheduling. After a brief review of earlier approaches, two conceptualizations of this field are introduced: First, shift scheduling as a field that ranges from extremely stable rosters at one pole to rather market-like approaches on the other pole. Unfortunately, already small alterations of a scheduling problem (e.g., the number of groups, the number of shifts) may call for rather different approaches and tools. Second, their environment shapes scheduling problems and scheduling has to be done within idiosyncratic organizational settings. This calls for the amalgamation of scheduling with other tasks (e.g., accounting) and for reflections whether better solutions might become possible by changes in the problem definition (e.g., other service levels, organizational changes). Therefore shift scheduling should be understood as a highly connected problem. Building upon these two conceptualizations, a few examples of software that ease scheduling in some areas of this field are given and future research questions are outlined.

  13. Nontraditional work schedules for pharmacists.

    PubMed

    Mahaney, Lynnae; Sanborn, Michael; Alexander, Emily

    2008-11-15

    Nontraditional work schedules for pharmacists at three institutions are described. The demand for pharmacists and health care in general continues to increase, yet significant material changes are occurring in the pharmacy work force. These changing demographics, coupled with historical vacancy rates and turnover trends for pharmacy staff, require an increased emphasis on workplace changes that can improve staff recruitment and retention. At William S. Middleton Memorial Veterans Affairs Hospital in Madison, Wisconsin, creative pharmacist work schedules and roles are now mainstays to the recruitment and retention of staff. The major challenge that such scheduling presents is the 8 hours needed to prepare a six-week schedule. Baylor Medical Center at Grapevine in Dallas, Texas, has a total of 45 pharmacy employees, and slightly less than half of the 24.5 full-time-equivalent staff work full-time, with most preferring to work one, two, or three days per week. As long as the coverage needs of the facility are met, Envision Telepharmacy in Alpine, Texas, allows almost any scheduling arrangement preferred by individual pharmacists or the pharmacist group covering the facility. Staffing involves a great variety of shift lengths and intervals, with shifts ranging from 2 to 10 hours. Pharmacy leaders must be increasingly aware of opportunities to provide staff with unique scheduling and operational enhancements that can provide for a better work-life balance. Compressed workweeks, job-sharing, and team scheduling were the most common types of alternative work schedules implemented at three different institutions.

  14. The Effectiveness of Block Scheduling.

    ERIC Educational Resources Information Center

    Creamean, Sharon Lightle; Horvath, Robert Jeffery

    This report describes a program for the exploration of block scheduling. The targeted population consists of high school students in a growing, middle-class community, located in a suburban setting of a large mid-western city. The historical background of block scheduling is documented through data gathered using attendance reports, student…

  15. Scheduling Software for Complex Scenarios

    NASA Technical Reports Server (NTRS)

    2006-01-01

    Preparing a vehicle and its payload for a single launch is a complex process that involves thousands of operations. Because the equipment and facilities required to carry out these operations are extremely expensive and limited in number, optimal assignment and efficient use are critically important. Overlapping missions that compete for the same resources, ground rules, safety requirements, and the unique needs of processing vehicles and payloads destined for space impose numerous constraints that, when combined, require advanced scheduling. Traditional scheduling systems use simple algorithms and criteria when selecting activities and assigning resources and times to each activity. Schedules generated by these simple decision rules are, however, frequently far from optimal. To resolve mission-critical scheduling issues and predict possible problem areas, NASA historically relied upon expert human schedulers who used their judgment and experience to determine where things should happen, whether they will happen on time, and whether the requested resources are truly necessary.

  16. Astronaut Office Scheduling System Software

    NASA Technical Reports Server (NTRS)

    Brown, Estevancio

    2010-01-01

    AOSS is a highly efficient scheduling application that uses various tools to schedule astronauts weekly appointment information. This program represents an integration of many technologies into a single application to facilitate schedule sharing and management. It is a Windows-based application developed in Visual Basic. Because the NASA standard office automation load environment is Microsoft-based, Visual Basic provides AO SS developers with the ability to interact with Windows collaboration components by accessing objects models from applications like Outlook and Excel. This also gives developers the ability to create newly customizable components that perform specialized tasks pertaining to scheduling reporting inside the application. With this capability, AOSS can perform various asynchronous tasks, such as gathering/ sending/ managing astronauts schedule information directly to their Outlook calendars at any time.

  17. Gang scheduling a parallel machine

    SciTech Connect

    Gorda, B.C.; Brooks, E.D. III.

    1991-03-01

    Program development on parallel machines can be a nightmare of scheduling headaches. We have developed a portable time sharing mechanism to handle the problem of scheduling gangs of processors. User program and their gangs of processors are put to sleep and awakened by the gang scheduler to provide a time sharing environment. Time quantums are adjusted according to priority queues and a system of fair share accounting. The initial platform for this software is the 128 processor BBN TC2000 in use in the Massively Parallel Computing Initiative at the Lawrence Livermore National Laboratory. 2 refs., 1 fig.

  18. Gang scheduling a parallel machine

    SciTech Connect

    Gorda, B.C.; Brooks, E.D. III.

    1991-12-01

    Program development on parallel machines can be a nightmare of scheduling headaches. We have developed a portable time sharing mechanism to handle the problem of scheduling gangs of processes. User programs and their gangs of processes are put to sleep and awakened by the gang scheduler to provide a time sharing environment. Time quantum are adjusted according to priority queues and a system of fair share accounting. The initial platform for this software is the 128 processor BBN TC2000 in use in the Massively Parallel Computing Initiative at the Lawrence Livermore National Laboratory.

  19. Accelerated immunotherapy schedules and premedication.

    PubMed

    Calabria, Christopher W; Cox, Linda

    2011-05-01

    Subcutaneous immunotherapy is divided into a buildup and a maintenance phase. Accelerated immunotherapy has the advantage of a reduced number of office visits. Rush and cluster immunotherapy schedules are the most common accelerated schedules used in the United States. A cluster immunotherapy schedule involves the patient receiving several allergen injections sequentially in a single day of treatment on nonconsecutive days. The maintenance dose is reached in 4 to 8 weeks. In rush immunotherapy protocols, higher doses are administered at intervals of 15 to 60 minutes in a period of 1 to 3 days until the maintenance dose is achieved. Copyright © 2011 Elsevier Inc. All rights reserved.

  20. Immunization Schedules for Infants and Children

    MedlinePlus

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedules for Infants and Children United States, 2017 ... any questions. View or Print a Schedule Recommended Immunizations for Children (Birth through 6 years) Schedule for ...

  1. Schedule-Report-Generator Computer Program

    NASA Technical Reports Server (NTRS)

    Collazo, Fernando F.

    1990-01-01

    Schedule Report Generator provides simple method for generating periodic schedule reports. Enables engineering manager to monitor tasks assigned to staff members on weekly basis. Sorts three types of reports by use of one or more data fields as sorting keys. Schedule Organizer (SO) (COSMIC program MSC-21525), Schedule Tracker (ST) (COSMIC program MSC-21526), and Schedule Report Generator (SRG) computer programs manipulating data-base files in ways advantageous in scheduling. Written in PL/1 and DEC Command Language (DCL).

  2. The GBT Dynamic Scheduling System

    NASA Astrophysics Data System (ADS)

    McCarty, M. T.; Balser, D. S.; Braatz, J.; Clark, M. H.; Condon, J.; Creager, R. E.; Maddalena, R. J.; Marganian, P.; O'Neil, K.; Sessoms, E.; Shelton, A. L.

    2012-09-01

    The Robert C. Byrd Green Bank Telescope (GBT) Dynamic Scheduling System (DSS), in use since September, 2009, was designed to maximize observing efficiency while preserving telescope flexibility and data quality without creating undue adversity for the observers. Using observing criteria; observer availability and qualifications for remote observing; three-dimensional weather forecasts; and telescope state, the DSS software optimally schedules observers 24 to 48 hours in advance for a telescope that has a wide-range of capabilities and a geographical location with variable weather patterns. The DSS project was closed October 28, 2011 and will now enter a continuing maintenance and enhancement phase. Recent improvements include a new resource calendar for incorporating telescope maintenance activities, a sensitivity calculator that leverages the scheduling algorithms to facilitate consistent tools for proposal preparation, improved support for monitoring observations, scheduling of high frequency continuum and spectral line observations for both sparse and fully sampled array receivers, and additional session parameters for observations having special requirements.

  3. Scheduling Spitzer: The SIRPASS Story

    NASA Technical Reports Server (NTRS)

    Mittman, David S.; Hawkins, Robert

    2013-01-01

    NASA's Spitzer Space Telescope was launched on August 25, 2003 from Florida's Cape Canaveral Air Force Base. Drifting in a unique Earth-trailing orbit around the Sun, Spitzer sees an optically invisible universe dominated by dust and stars. Since 1997, the Spitzer Integrated Resource Planning and Scheduling System (SIRPASS) has helped produce spacecraft activity plans for the Spitzer Space Telescope. SIRPASS is used by members of the Observatory Planning and Scheduling Team to plan, schedule and sequence the Telescope from data made available to them from the science and engineering community. Because of the volume of data that needs to be scheduled, SIRPASS offers a variety of automated assistants to aid in this task. This paper will describe the functional elements of the SIRPASS software system -- emphasizing the role that automation plays in the system -- and will highlight lessons learned for the software developer from a decade of Spitzer Space Telescope operations experience.

  4. Future aircraft networks and schedules

    NASA Astrophysics Data System (ADS)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  5. Planning and scheduling for success

    NASA Technical Reports Server (NTRS)

    Manzanera, Ignacio

    1994-01-01

    Planning and scheduling programs are excellent management tools when properly introduced to the project management team and regularly maintained. Communications, creativity, flexibility and accuracy are substantially improved by following a simple set of rules. A planning and scheduling program will work for you if you believe in it, make others in your project team realize its benefits, and make it an extension of your project cost control philosophy.

  6. Construction schedules slack time minimizing

    NASA Astrophysics Data System (ADS)

    Krzemiński, Michał

    2017-07-01

    The article presents two copyright models for minimizing downtime working brigades. Models have been developed for construction schedules performed using the method of work uniform. Application of flow shop models is possible and useful for the implementation of large objects, which can be divided into plots. The article also presents a condition describing gives which model should be used, as well as a brief example of optimization schedule. The optimization results confirm the legitimacy of the work on the newly-developed models.

  7. Computerized scheduling of longwall moves

    SciTech Connect

    Patrick, C.

    1996-12-31

    The disassembly, transport, and reassembly of approximately 3,000 tons of equipment in as short a time as possible is very complex. The encumbered space and geological dynamics of the underground environment further complicate the planning, scheduling, and control of the longwall equipment move or face-to-face transfer. In the US, longwall move time greatly varies from a minimum of three days to more than twenty days. While some of this variation can be attributed to differing geologic conditions, mining systems, and move techniques, the organization and management of the longwall move process is a primary factor in move duration. The application of computer-based project scheduling to maintain and control the multitude of interacting resources and activities is demonstrated. This paper details an ongoing investigation of the application of computer scheduling to US longwall moves. An overview of the scheduling and analysis of longwall moves over the last five years is provided. This includes project task definition and level of detail, establishment of task relationships and sequences, task time estimation, and resource allocation and leveling. The paper further discusses, relative to longwall moves, computer application factors, modeling considerations, and assessments of software for computerized scheduling. The accompanying presentation will provide a demonstration of current project scheduling software as applied to actual longwall move processes.

  8. 46 CFR 525.2 - Terminal schedules.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 9 2012-10-01 2012-10-01 false Terminal schedules. 525.2 Section 525.2 Shipping FEDERAL MARITIME COMMISSION REGULATIONS AFFECTING OCEAN SHIPPING IN FOREIGN COMMERCE MARINE TERMINAL OPERATOR SCHEDULES § 525.2 Terminal schedules. (a) Marine terminal operator schedules. A marine terminal operator, at...

  9. Evaluation of 4 X 4 Block Schedule.

    ERIC Educational Resources Information Center

    Mutter, Davida W.; And Others

    1997-01-01

    Describes 4 X 4 block scheduling and its advantages and disadvantages. Examines block scheduling's effects on a Virginia high school's students, teachers, and administration, based on school data and survey results. Most participants preferred block scheduling over the six-period schedule. Grades, attendance, and discipline improved; students…

  10. Batch Scheduling a Fresh Approach

    NASA Technical Reports Server (NTRS)

    Cardo, Nicholas P.; Woodrow, Thomas (Technical Monitor)

    1994-01-01

    The Network Queueing System (NQS) was designed to schedule jobs based on limits within queues. As systems obtain more memory, the number of queues increased to take advantage of the added memory resource. The problem now becomes too many queues. Having a large number of queues provides users with the capability to gain an unfair advantage over other users by tailoring their job to fit in an empty queue. Additionally, the large number of queues becomes confusing to the user community. The High Speed Processors group at the Numerical Aerodynamics Simulation (NAS) Facility at NASA Ames Research Center developed a new approach to batch job scheduling. This new method reduces the number of queues required by eliminating the need for queues based on resource limits. The scheduler examines each request for necessary resources before initiating the job. Also additional user limits at the complex level were added to provide a fairness to all users. Additional tools which include user job reordering are under development to work with the new scheduler. This paper discusses the objectives, design and implementation results of this new scheduler

  11. Environmental surveillance master sampling schedule

    SciTech Connect

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  12. Batch Scheduling a Fresh Approach

    NASA Technical Reports Server (NTRS)

    Cardo, Nicholas P.; Woodrow, Thomas (Technical Monitor)

    1994-01-01

    The Network Queueing System (NQS) was designed to schedule jobs based on limits within queues. As systems obtain more memory, the number of queues increased to take advantage of the added memory resource. The problem now becomes too many queues. Having a large number of queues provides users with the capability to gain an unfair advantage over other users by tailoring their job to fit in an empty queue. Additionally, the large number of queues becomes confusing to the user community. The High Speed Processors group at the Numerical Aerodynamics Simulation (NAS) Facility at NASA Ames Research Center developed a new approach to batch job scheduling. This new method reduces the number of queues required by eliminating the need for queues based on resource limits. The scheduler examines each request for necessary resources before initiating the job. Also additional user limits at the complex level were added to provide a fairness to all users. Additional tools which include user job reordering are under development to work with the new scheduler. This paper discusses the objectives, design and implementation results of this new scheduler

  13. The sleeping giant: Reinforcement schedules

    PubMed Central

    Zeiler, Michael D.

    1984-01-01

    Schedule research has been the core of operant conditioning, but it is no longer an active area, at least with respect to its traditional focus of describing and explaining moment-to-moment behavior. Yet schedules are central in psychology: Not only do they establish lawful behavior, but they also play a major role in determining the effects of other variables. The reason for the decline appears to be primarily theoretical, in that the work seems not to have led to meaningful integration. The search for controlling variables brought into play by schedule specification has proven unsuccessful, and a catalog of all possible schedule effects is of limited interest. The paper reviews the reasons for the contemporary state of affairs. One prediction about future developments is that instead of revealing component variables and their modes of interaction, schedule effects will be treated as basic empirical laws. Theory will take the form of abstract statements that integrate these separate laws by reference to higher-order principles rather than by reduction to supposedly simpler component variables. PMID:16812403

  14. Scheduling: A guide for program managers

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The following topics are discussed concerning scheduling: (1) milestone scheduling; (2) network scheduling; (3) program evaluation and review technique; (4) critical path method; (5) developing a network; (6) converting an ugly duckling to a swan; (7) network scheduling problem; (8) (9) network scheduling when resources are limited; (10) multi-program considerations; (11) influence on program performance; (12) line-of-balance technique; (13) time management; (14) recapitulization; and (15) analysis.

  15. Artificial intelligence approaches to astronomical observation scheduling

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.; Miller, Glenn

    1988-01-01

    Automated scheduling will play an increasing role in future ground- and space-based observatory operations. Due to the complexity of the problem, artificial intelligence technology currently offers the greatest potential for the development of scheduling tools with sufficient power and flexibility to handle realistic scheduling situations. Summarized here are the main features of the observatory scheduling problem, how artificial intelligence (AI) techniques can be applied, and recent progress in AI scheduling for Hubble Space Telescope.

  16. Robust stochastic mine production scheduling

    NASA Astrophysics Data System (ADS)

    Kumral, Mustafa

    2010-06-01

    The production scheduling of open pit mines aims to determine the extraction sequence of blocks such that the net present value (NPV) of a mining project is maximized under capacity and access constraints. This sequencing has significant effect on the profitability of the mining venture. However, given that the values of coefficients in the optimization procedure are obtained in a medium of sparse data and unknown future events, implementations based on deterministic models may lead to destructive consequences to the company. In this article, a robust stochastic optimization (RSO) approach is used to deal with mine production scheduling in a manner such that the solution is insensitive to changes in input data. The approach seeks a trade off between optimality and feasibility. The model is demonstrated on a case study. The findings showed that the approach can be used in mine production scheduling problems efficiently.

  17. Fuzzy scheduled RTDA controller design.

    PubMed

    Srinivasan, K; Anbarasan, K

    2013-03-01

    In this paper, the design and development of fuzzy scheduled robustness, tracking, disturbance rejection and overall aggressiveness (RTDA) controller design for non-linear processes are discussed. pH process is highly non-linear and the design of good controller for this process is always a challenging one due to large gain variation. Fuzzy scheduled RTDA controller design based on normalized integral square error (N_ISE) performance criteria for pH neutralization process is developed. The applicability of the proposed controller is tested for other different non-linear processes like type I diabetic process and conical tank process. The servo and regulatory performance of fuzzy scheduled RTDA controller design is compared with well-tuned internal model control (IMC) and dynamic matrix control (DMC)-based control schemes. Copyright © 2012 ISA. Published by Elsevier Ltd. All rights reserved.

  18. Environmental surveillance master sampling schedule

    SciTech Connect

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington.

  19. Optimal randomized scheduling by replacement

    SciTech Connect

    Saias, I.

    1996-05-01

    In the replacement scheduling problem, a system is composed of n processors drawn from a pool of p. The processors can become faulty while in operation and faulty processors never recover. A report is issued whenever a fault occurs. This report states only the existence of a fault but does not indicate its location. Based on this report, the scheduler can reconfigure the system and choose another set of n processors. The system operates satisfactorily as long as, upon report of a fault, the scheduler chooses n non-faulty processors. We provide a randomized protocol maximizing the expected number of faults the system can sustain before the occurrence of a crash. The optimality of the protocol is established by considering a closely related dual optimization problem. The game-theoretic technical difficulties that we solve in this paper are very general and encountered whenever proving the optimality of a randomized algorithm in parallel and distributed computation.

  20. Scheduling Linearly Indexed Assignment Codes

    NASA Astrophysics Data System (ADS)

    Kailath, Thomas; Roychowdhury, Vwani P.

    1989-05-01

    It has been recently shown that linearly indexed Assignment Codes can be efficiently used for coding several problems especially in signal processing and matrix algebra. In fact, mathematical expressions for many algorithms are directly in the form of linearly indexed codes, and examples include the formulas for matrix multiplication, any m-dimensional convolution/correlation, matrix transposition, and solving matrix Lyapunov's equation. Systematic procedures for converting linearly indexed Assignment Codes to localized algorithms that are closely related to Regular Iterative Algorithms (RIAs) have also been developed. These localized algorithms can be often efficiently scheduled by modeling them as RIAs; however, it is not always efficient to do so. In this paper we shall analyze and develop systematic procedures for determining efficient schedules directly for the linearly indexed ACs and the localized algorithms. We shall also illustrate our procedures by determining schedules for examples such as matrix transposition and Gauss-Jordan elimination algorithm.

  1. Feature-based telescope scheduler

    NASA Astrophysics Data System (ADS)

    Naghib, Elahesadat; Vanderbei, Robert J.; Stubbs, Christopher

    2016-07-01

    Feature-based Scheduler offers a sequencing strategy for ground-based telescopes. This scheduler is designed in the framework of Markovian Decision Process (MDP), and consists of a sub-linear online controller, and an offline supervisory control-optimizer. Online control law is computed at the moment of decision for the next visit, and the supervisory optimizer trains the controller by simulation data. Choice of the Differential Evolution (DE) optimizer, and introducing a reduced state space of the telescope system, offer an efficient and parallelizable optimization algorithm. In this study, we applied the proposed scheduler to the problem of Large Synoptic Survey Telescope (LSST). Preliminary results for a simplified model of LSST is promising in terms of both optimality, and computational cost.

  2. Computerized Schedule Effectiveness Technique /SET/ determines present and future schedule position

    NASA Technical Reports Server (NTRS)

    Ballard, D.; Birdsong, J.; Calva, R.

    1967-01-01

    Computerized scheduling system calculates an index of overall schedule-effectiveness. The schedule-effectiveness index is a measurement of actual overall performance against the existing schedule, and a series of schedule-effectiveness values indicates the trend of actual performance. This computer program is written in Fortran 4.

  3. A Generic Expert Scheduling System Architecture and Toolkit: GUESS (Generically Used Expert Scheduling System)

    NASA Technical Reports Server (NTRS)

    Liebowitz, Jay; Krishnamurthy, Vijaya; Rodens, Ira; Houston, Chapman; Liebowitz, Alisa; Baek, Seung; Radko, Joe; Zeide, Janet

    1996-01-01

    Scheduling has become an increasingly important element in today's society and workplace. Within the NASA environment, scheduling is one of the most frequently performed and challenging functions. Towards meeting NASA's scheduling needs, a research version of a generic expert scheduling system architecture and toolkit has been developed. This final report describes the development and testing of GUESS (Generically Used Expert Scheduling System).

  4. Micro-Opportunistic Scheduling: The Micro-Boss Factory Scheduler

    DTIC Science & Technology

    1994-01-01

    A major challenge for research in production management is to develop new finite-capacity scheduling techniques and tools that (1) can account more...precisely for actual production management constraints and objectives, (2) are better suited for handling production contingencies, and (3) allow the

  5. Scheduling Tasks In Parallel Processing

    NASA Technical Reports Server (NTRS)

    Price, Camille C.; Salama, Moktar A.

    1989-01-01

    Algorithms sought to minimize time and cost of computation. Report describes research on scheduling of computations tasks in system of multiple identical data processors operating in parallel. Computational intractability requires use of suboptimal heuristic algorithms. First algorithm called "list heuristic", variation of classical list scheduling. Second algorithm called "cluster heuristic" applied to tightly coupled tasks and consists of four phases. Third algorithm called "exchange heuristic", iterative-improvement algorithm beginning with initial feasible assignment of tasks to processors and periods of time. Fourth algorithm is iterative one for optimal assignment of tasks and based on concept called "simulated annealing" because of mathematical resemblance to aspects of physical annealing processes.

  6. Hubble Systems Optimize Hospital Schedules

    NASA Technical Reports Server (NTRS)

    2009-01-01

    Don Rosenthal, a former Ames Research Center computer scientist who helped design the Hubble Space Telescope's scheduling software, co-founded Allocade Inc. of Menlo Park, California, in 2004. Allocade's OnCue software helps hospitals reclaim unused capacity and optimize constantly changing schedules for imaging procedures. After starting to use the software, one medical center soon reported noticeable improvements in efficiency, including a 12 percent increase in procedure volume, 35 percent reduction in staff overtime, and significant reductions in backlog and technician phone time. Allocade now offers versions for outpatient and inpatient magnetic resonance imaging (MRI), ultrasound, interventional radiology, nuclear medicine, Positron Emission Tomography (PET), radiography, radiography-fluoroscopy, and mammography.

  7. A planning and scheduling lexicon

    NASA Technical Reports Server (NTRS)

    Cruz, Jennifer W.; Eggemeyer, William C.

    1989-01-01

    A lexicon related to mission planning and scheduling for spacecraft is presented. Planning and scheduling work is known as sequencing. Sequencing is a multistage process of merging requests from both the science and engineering arenas to accomplish the objectives defined in the requests. The multistage process begins with the creation of science and engineering goals, continues through their integration into the sequence, and eventually concludes with command execution onboard the spacecraft. The objective of this publication is to introduce some formalism into the field of spacecraft sequencing-system technology. This formalism will make it possible for researchers and potential customers to communicate about system requirements and capabilities in a common language.

  8. Environmental surveillance master sampling schedule

    SciTech Connect

    Bisping, L.E.

    1996-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the US Department of Energy (DOE). This document contains the planned 1996 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project.

  9. Middle School Organization and Scheduling.

    ERIC Educational Resources Information Center

    McGinley, Nancy J.

    The major purpose of this report is to present information about the organization of middle schools in the school district of Philadelphia. The report includes: (1) summary information on rostering/scheduling practices; and (2) comparisons of promotion/retention rates, average daily attendance, and suspension rates in middle schools with different…

  10. Flexible Scheduling: Implementing an Innovation

    ERIC Educational Resources Information Center

    McGregor, Joy

    2006-01-01

    Teachers, school library media specialists (SLMSs), and principals in six elementary schools were interviewed to explore the ways in which schools have successfully implemented flexible scheduling in their libraries. Overall findings and conclusions of the study are linked with Rogers' diffusion of innovation theory and compared with Shannon's…

  11. Flexible Schedules and Shift Work.

    ERIC Educational Resources Information Center

    Beers, Thomas M.

    2000-01-01

    Flexible work hours have gained prominence, as more than 25 million workers (27.6% of all full-time workers) can now vary their schedules. However, there has been little change since the mid-1980s in the proportion who work a shift other than a regular daytime shift. (JOW)

  12. A scheduling model for astronomy

    NASA Astrophysics Data System (ADS)

    Solar, M.; Michelon, P.; Avarias, J.; Garces, M.

    2016-04-01

    Astronomical scheduling problem has several external conditions that change dynamically at any time during observations, like weather condition (humidity, temperature, wind speed, opacity, etc.), and target visibility conditions (target over the horizon, Sun/Moon blocking the target). Therefore, a dynamic re-scheduling is needed. An astronomical project will be scheduled as one or more Scheduling Blocks (SBs) as an atomic unit of astronomical observations. We propose a mixed integer linear programming (MILP) solution to select the best SBs, favors SBs with high scientific values, and thus maximizing the quantity of completed observation projects. The data content of Atacama Large Millimeter/Submillimeter Array (ALMA) projects of cycle 0 and cycle 1 were analyzed, and a synthetic set of tests of the real instances was created. Two configurations, one of 5000 SBs in a 3 months season and another 10,000 SBs a 6 months season were created. These instances were evaluated with excellent results. Through the testing it is showed that the MILP proposal has optimal solutions.

  13. 1996 Wholesale Power and Transmission Rate Schedules.

    SciTech Connect

    United States. Bonneville Power Administration.

    1996-10-01

    Bonneville Power Administration`s (BPA) 1996 Wholesale Power Rate Schedules, 1996 Ancillary Products and Services Rate Schedule, 1996 Transmission Rate Schedules, and General Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1996. These rate schedules and provisions were approved by the Federal Energy Regulatory Commission (FERC), United States Department of Energy, in September 1996 (Docket Nos EF96-2011-000 and EF96f-2021-000). These rate schedules and General Rate Schedule Provisions were approved on a final basis by the FERC July 30, 1997, in Dept. of Energy--Bonneville Power Administration, Docket Nos. EF96-2011-000 and EF96-2021-000. Except as noted elsewhere, these 1996 rate schedules and provisions supersede BPA`s Wholesale Power Rate Schedules and General Rate Schedule Provisions, and Transmission Rate Schedules and General Transmission Rate Schedule Provisions, effective October 1, 1995. These rate schedules and general rate schedule provisions include all errata.

  14. User requirements for a patient scheduling system

    NASA Technical Reports Server (NTRS)

    Zimmerman, W.

    1979-01-01

    A rehabilitation institute's needs and wants from a scheduling system were established by (1) studying the existing scheduling system and the variables that affect patient scheduling, (2) conducting a human-factors study to establish the human interfaces that affect patients' meeting prescribed therapy schedules, and (3) developing and administering a questionnaire to the staff which pertains to the various interface problems in order to identify staff requirements to minimize scheduling problems and other factors that may limit the effectiveness of any new scheduling system.

  15. Adaptive Parallel Job Scheduling with Flexible CoScheduling

    SciTech Connect

    Frachtenberg, Eitan; Feitelson, Dror; Petrini, Fabrizio; Fernandez, Juan

    2005-11-01

    Abstract—Many scientific and high-performance computing applications consist of multiple processes running on different processors that communicate frequently. Because of their synchronization needs, these applications can suffer severe performance penalties if their processes are not all coscheduled to run together. Two common approaches to coscheduling jobs are batch scheduling, wherein nodes are dedicated for the duration of the run, and gang scheduling, wherein time slicing is coordinated across processors. Both work well when jobs are load-balanced and make use of the entire parallel machine. However, these conditions are rarely met and most realistic workloads consequently suffer from both internal and external fragmentation, in which resources and processors are left idle because jobs cannot be packed with perfect efficiency. This situation leads to reduced utilization and suboptimal performance. Flexible CoScheduling (FCS) addresses this problem by monitoring each job’s computation granularity and communication pattern and scheduling jobs based on their synchronization and load-balancing requirements. In particular, jobs that do not require stringent synchronization are identified, and are not coscheduled; instead, these processes are used to reduce fragmentation. FCS has been fully implemented on top of the STORM resource manager on a 256-processor Alpha cluster and compared to batch, gang, and implicit coscheduling algorithms. This paper describes in detail the implementation of FCS and its performance evaluation with a variety of workloads, including large-scale benchmarks, scientific applications, and dynamic workloads. The experimental results show that FCS saturates at higher loads than other algorithms (up to 54 percent higher in some cases), and displays lower response times and slowdown than the other algorithms in nearly all scenarios.

  16. 77 FR 64848 - Proposed Collection; Comment Request for Form 1120S, Schedule D, Schedule K-1, and Schedule M-3

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... Internal Revenue Service Proposed Collection; Comment Request for Form 1120S, Schedule D, Schedule K-1, and Schedule M-3 AGENCY: Internal Revenue Service (IRS), Treasury. ACTION: Notice and request for comments... assured of consideration. ADDRESSES: Direct all written comments to Yvette Lawrence, Internal...

  17. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    PubMed

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable.

  18. 29 CFR 1952.101 - Developmental schedule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Oregon § 1952.101 Developmental schedule. The Oregon plan is developmental. The schedule of developmental steps as described in the plan...

  19. 29 CFR 1952.101 - Developmental schedule.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Oregon § 1952.101 Developmental schedule. The Oregon plan is developmental. The schedule of developmental steps as described in the plan...

  20. 29 CFR 1952.101 - Developmental schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Oregon § 1952.101 Developmental schedule. The Oregon plan is developmental. The schedule of developmental steps as described in the plan...

  1. 29 CFR 1952.101 - Developmental schedule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Oregon § 1952.101 Developmental schedule. The Oregon plan is developmental. The schedule of developmental steps as described in the plan...

  2. 48 CFR 245.606 - Inventory schedules.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Inventory schedules. 245.606 Section 245.606 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM... Contractor Inventory 245.606 Inventory schedules....

  3. A Decision Support System for Academic Scheduling.

    ERIC Educational Resources Information Center

    Burleson, Donald K.; Leivano, Rodrigo J.

    1986-01-01

    Describes the use of a decision support system to operate on a database for academic scheduling. Discusses the scheduling environment, database subsystem, dialog subsystem, modeling subsystem, and output formats. (JM)

  4. A DSN optimal spacecraft scheduling model

    NASA Technical Reports Server (NTRS)

    Webb, W. A.

    1982-01-01

    A computer model is described which uses mixed-integer linear programming to provide optimal DSN spacecraft schedules given a mission set and specified scheduling requirements. A solution technique is proposed which uses Bender's Method and a heuristic starting algorithm.

  5. 29 CFR 1952.123 - Developmental schedule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Washington § 1952.123 Developmental schedule. The Washington State plan is developmental. The following is the developmental schedule as...

  6. 29 CFR 1952.221 - Developmental schedule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Tennessee § 1952.221 Developmental schedule. The Tennessee state plan is developmental. The following is the developmental schedule as...

  7. Integrating protocol schedules with patients' personal calendars.

    PubMed

    Civan, Andrea; Gennari, John H; Pratt, Wanda

    2006-01-01

    We propose a new approach for integrating protocol care schedules into patients' personal calendars. This approach could provide patients with greater control over their current and future scheduling demands as they seek and receive protocol-based care.

  8. Scheduling from the perspective of the application

    SciTech Connect

    Berman, F.; Wolski, R.

    1996-12-31

    Metacomputing is the aggregation of distributed and high-performance resources on coordinated networks. With careful scheduling, resource-intensive applications can be implemented efficiently on metacomputing systems at the sizes of interest to developers and users. In this paper we focus on the problem of scheduling applications on metacomputing systems. We introduce the concept of application-centric scheduling in which everything about the system is evaluated in terms of its impact on the application. Application-centric scheduling is used by virtually all metacomputer programmers to achieve performance on metacomputing systems. We describe two successful metacomputing applications to illustrate this approach, and describe AppLeS scheduling agents which generalize the application-centric scheduling approach. Finally, we show preliminary results which compare AppLeS-derived schedules with conventional strip and blocked schedules for a two-dimensional Jacobi code.

  9. LDRD Report: Scheduling Irregular Algorithms

    SciTech Connect

    Boman, Erik G.

    2014-10-01

    This LDRD project was a campus exec fellowship to fund (in part) Donald Nguyen’s PhD research at UT-Austin. His work has focused on parallel programming models, and scheduling irregular algorithms on shared-memory systems using the Galois framework. Galois provides a simple but powerful way for users and applications to automatically obtain good parallel performance using certain supported data containers. The naïve user can write serial code, while advanced users can optimize performance by advanced features, such as specifying the scheduling policy. Galois was used to parallelize two sparse matrix reordering schemes: RCM and Sloan. Such reordering is important in high-performance computing to obtain better data locality and thus reduce run times.

  10. Models of ratio schedule performance.

    PubMed

    Bizo, L A; Killeen, P R

    1997-07-01

    Predictions of P. R. Killeen's (1994) mathematical principles of reinforcement were tested for responding on ratio reinforcement schedules. The type of response key, the number of sessions per condition, and first vs. second half of a session had negligible effects on responding. Longer reinforcer durations and larger grain types engendered more responding, affecting primarily the parameter alpha (specific activation). Key pecking was faster than treadle pressing, affecting primarily the parameter delta (response time). Longer intertrial intervals led to higher overall response rates and shorter postreinforcement pauses and higher running rates, and ruled out some competing explanations. The treadle data required a distinction between the energetic requirements and rate-limiting properties of extended responses. The theory was extended to predict pause durations and run rates on ratio schedules.

  11. Real-time scheduling using minimum search

    NASA Technical Reports Server (NTRS)

    Tadepalli, Prasad; Joshi, Varad

    1992-01-01

    In this paper we consider a simple model of real-time scheduling. We present a real-time scheduling system called RTS which is based on Korf's Minimin algorithm. Experimental results show that the schedule quality initially improves with the amount of look-ahead search and tapers off quickly. So it sppears that reasonably good schedules can be produced with a relatively shallow search.

  12. Intelsat satellite scheduled for launch

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The launch schedule for Intelsat 5-B, the prime Intelsat satellite to provide communications services between the Americas, Europe, the Middle East, and Africa, is presented. The planned placement of the satellite into an elliptical transfer orbit, and circularization of the orbit at geosynchronous altitude over the equator are described. Characteristics of the Atlas Centaur launch vehicle, AC-56, are given. The launch operation is summarized and the launch sequence presented. The Intelsat team and contractors are listed.

  13. Environmental surveillance master sampling schedule

    SciTech Connect

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  14. Scheduled Peripheral Component Interconnect Arbiter

    NASA Technical Reports Server (NTRS)

    Nixon, Scott Alan (Inventor)

    2015-01-01

    Systems and methods are described for arbitrating access of a communication bus. In one embodiment, a method includes performing steps on one or more processors. The steps include: receiving an access request from a device of the communication bus; evaluating a bus schedule to determine an importance of the device based on the access request; and selectively granting access of the communication bus to the device based on the importance of the device.

  15. Environmental surveillance master sampling schedule

    SciTech Connect

    Bisping, L.E.

    1993-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). Samples are routinely collected and analyzed to determine the quality of air, surface water, ground water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Drinking Water Project, and Ground-Water Surveillance Project.

  16. Littoral Combat Ship Crew Scheduling

    DTIC Science & Technology

    2015-03-01

    Yet, even for a shorter-than-desired time horizon, it takes many hours of computation. Rolling horizon is a heuristic approach that produces a full...long- term schedule in under an hour but requires manual modifications to misaligned crews. Fix-and-relax is a more-elaborate heuristic with potential...18  4.  Explanation of Formulation ..............................................................21  B.  HEURISTIC SIMPLIFICATION

  17. 19 CFR 122.63 - Scheduled airlines.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 19 Customs Duties 1 2010-04-01 2010-04-01 false Scheduled airlines. 122.63 Section 122.63 Customs... AIR COMMERCE REGULATIONS Clearance of Aircraft and Permission To Depart § 122.63 Scheduled airlines... scheduled airlines covered by this subpart. (a) Clearance at other than airport of final departure. Aircraft...

  18. 7 CFR 283.29 - Scheduling conference.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Scheduling conference. 283.29 Section 283.29... Procedure for Appeals of QC Claims of Less Than $50,000 § 283.29 Scheduling conference. (a) Time and place. The ALJ shall direct the parties or their counsel to attend a scheduling conference following...

  19. 40 CFR 52.1677 - Compliance schedules.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... sections 223.1(a), 225.3(c), and 230.2(d) of Subchapter A, Chapter III, Title 6 of New York State's... schedule for any source to which the application of the compliance schedule in paragraphs (d)(2), (3), (5... been submitted for every source for which they are required. (d) Federal compliance schedules. (1) The...

  20. 21 CFR 1308.49 - Emergency scheduling.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 9 2011-04-01 2011-04-01 false Emergency scheduling. 1308.49 Section 1308.49 Food... Hearings § 1308.49 Emergency scheduling. Pursuant to 21 U.S.C. 811(h) and without regard to the... the end of one year from the effective date of the order scheduling the substance, except that during...

  1. 7 CFR 283.29 - Scheduling conference.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Scheduling conference. 283.29 Section 283.29... Procedure for Appeals of QC Claims of Less Than $50,000 § 283.29 Scheduling conference. (a) Time and place. The ALJ shall direct the parties or their counsel to attend a scheduling conference following the...

  2. 48 CFR 2908.404 - Using schedules.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SOURCES OF SUPPLIES AND SERVICES Federal Supply Schedules 2908.404 Using schedules. Small business... followed may be modified by the Office of Small Business Program as appropriate in order to comply with GSA Federal Supply Schedule procedures (e.g., first tier contracts may be required to report their commercial...

  3. Centralized scheduling an unanticipated revenue cycle opportunity.

    PubMed

    O'Neill, Daniel P; Kenniff, Peter B

    2007-09-01

    Centralized outpatient scheduling can provide acute care hospitals with accessibility and service levels equal to freestanding facilities, enabling hospitals to recapture lost market share. Two implementation strategies are critical to the success of centralized scheduling: Correctly developing the schedule. Managing the incoming call volume.

  4. 77 FR 41258 - FOIA Fee Schedule Update

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-13

    ... SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to the Board's...

  5. 76 FR 43819 - FOIA Fee Schedule Update

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ... SAFETY BOARD 10 CFR Part 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to the Board's...

  6. 75 FR 39629 - FOIA Fee Schedule Update

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-12

    ... 1703 FOIA Fee Schedule Update AGENCY: Defense Nuclear Facilities Safety Board. ACTION: Establishment of FOIA Fee Schedule. SUMMARY: The Defense Nuclear Facilities Safety Board is publishing its Freedom of Information Act (FOIA) Fee Schedule Update pursuant to 10 CFR 1703.107(b)(6) of the Board's regulations....

  7. 7 CFR 58.440 - Make schedule.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 3 2013-01-01 2013-01-01 false Make schedule. 58.440 Section 58.440 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards... Procedures § 58.440 Make schedule. A uniform schedule should be established and followed as closely as...

  8. 7 CFR 58.440 - Make schedule.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 3 2014-01-01 2014-01-01 false Make schedule. 58.440 Section 58.440 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards... Procedures § 58.440 Make schedule. A uniform schedule should be established and followed as closely as...

  9. 7 CFR 58.440 - Make schedule.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Make schedule. 58.440 Section 58.440 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards... Procedures § 58.440 Make schedule. A uniform schedule should be established and followed as closely as...

  10. 7 CFR 58.440 - Make schedule.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 3 2012-01-01 2012-01-01 false Make schedule. 58.440 Section 58.440 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards... Procedures § 58.440 Make schedule. A uniform schedule should be established and followed as closely as...

  11. 7 CFR 58.440 - Make schedule.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 3 2011-01-01 2011-01-01 false Make schedule. 58.440 Section 58.440 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards... Procedures § 58.440 Make schedule. A uniform schedule should be established and followed as closely as...

  12. 15 CFR 400.44 - Zone schedule.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Executive Secretary (in both paper and electronic copies) a zone schedule which sets forth the elements required in this section. No element of a zone schedule (including any amendment to the zone schedule) may... table of contents; (3) Internal rules/regulations and policies for the zone; (4) All rates or...

  13. 40 CFR 52.524 - Compliance schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Compliance schedules. 52.524 Section 52...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Florida § 52.524 Compliance schedules. (a) The requirements of § 51.262(a) of this chapter are not met since compliance schedules with adequate increments...

  14. 40 CFR 52.927 - Compliance schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Compliance schedules. 52.927 Section 52...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Kentucky § 52.927 Compliance schedules. (a) The requirements of § 51.262(a) of this chapter are not met since compliance schedules with adequate increments...

  15. 40 CFR 52.134 - Compliance schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Compliance schedules. 52.134 Section 52...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Arizona § 52.134 Compliance schedules. (a) Federal compliance schedule. (1) Except as provided in paragraph (a)(2) of this section, the owner or operator of...

  16. Response Strength in Extreme Multiple Schedules

    ERIC Educational Resources Information Center

    McLean, Anthony P.; Grace, Randolph C.; Nevin, John A.

    2012-01-01

    Four pigeons were trained in a series of two-component multiple schedules. Reinforcers were scheduled with random-interval schedules. The ratio of arranged reinforcer rates in the two components was varied over 4 log units, a much wider range than previously studied. When performance appeared stable, prefeeding tests were conducted to assess…

  17. Response Strength in Extreme Multiple Schedules

    ERIC Educational Resources Information Center

    McLean, Anthony P.; Grace, Randolph C.; Nevin, John A.

    2012-01-01

    Four pigeons were trained in a series of two-component multiple schedules. Reinforcers were scheduled with random-interval schedules. The ratio of arranged reinforcer rates in the two components was varied over 4 log units, a much wider range than previously studied. When performance appeared stable, prefeeding tests were conducted to assess…

  18. 49 CFR Schedule C to Subpart B of... - Schedule C to Subpart B of Part 1139

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Schedule C to Subpart B of Part 1139 C Schedule C... REVENUE PROCEEDINGS Intercity Bus Industry Pt. 1139, Subpt. B, Sch. C Schedule C to Subpart B of Part 1139 Attachment 1 Schedule C Part I—Condensed Income Statement () Greyhound Lines, Inc.()Trailways combined() All...

  19. 49 CFR Schedule C to Subpart B of... - Schedule C to Subpart B of Part 1139

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 8 2014-10-01 2014-10-01 false Schedule C to Subpart B of Part 1139 C Schedule C... REVENUE PROCEEDINGS Intercity Bus Industry Pt. 1139, Subpt. B, Sch. C Schedule C to Subpart B of Part 1139 Attachment 1 Schedule C Part I—Condensed Income Statement () Greyhound Lines, Inc.()Trailways combined()...

  20. Scheduler Design Criteria: Requirements and Considerations

    NASA Technical Reports Server (NTRS)

    Lee, Hanbong

    2016-01-01

    This presentation covers fundamental requirements and considerations for developing schedulers in airport operations. We first introduce performance and functional requirements for airport surface schedulers. Among various optimization problems in airport operations, we focus on airport surface scheduling problem, including runway and taxiway operations. We then describe a basic methodology for airport surface scheduling such as node-link network model and scheduling algorithms previously developed. Next, we explain how to design a mathematical formulation in more details, which consists of objectives, decision variables, and constraints. Lastly, we review other considerations, including optimization tools, computational performance, and performance metrics for evaluation.

  1. A planning language for activity scheduling

    NASA Technical Reports Server (NTRS)

    Zoch, David R.; Lavallee, David; Weinstein, Stuart; Tong, G. Michael

    1991-01-01

    Mission planning and scheduling of spacecraft operations are becoming more complex at NASA. Described here are a mission planning process; a robust, flexible planning language for spacecraft and payload operations; and a software scheduling system that generates schedules based on planning language inputs. The mission planning process often involves many people and organizations. Consequently, a planning language is needed to facilitate communication, to provide a standard interface, and to represent flexible requirements. The software scheduling system interprets the planning language and uses the resource, time duration, constraint, and alternative plan flexibilities to resolve scheduling conflicts.

  2. Testing Task Schedulers on Linux System

    NASA Astrophysics Data System (ADS)

    Jelenković, Leonardo; Groš, Stjepan; Jakobović, Domagoj

    Testing task schedulers on Linux operating system proves to be a challenging task. There are two main problems. The first one is to identify which properties of the scheduler to test. The second problem is how to perform it, e.g., which API to use that is sufficiently precise and in the same time supported on most platforms. This paper discusses the problems in realizing test framework for testing task schedulers and presents one potential solution. Observed behavior of the scheduler is the one used for “normal” task scheduling (SCHED_OTHER), unlike one used for real-time tasks (SCHED_FIFO, SCHED_RR).

  3. Schedule-induced defecation by rats during ratio and interval schedules of food reinforcement.

    PubMed Central

    Wylie, A M; Layng, M P; Meyer, K A

    1993-01-01

    Lever pressing in rats was maintained by continuous and intermittent schedules of food while defecation was monitored. In Experiment 1, reinforcement densities were matched across variable-ratio and variable-interval schedules for three pairs of rats. Defecation occurred in all 3 rats on the variable-ratio schedule and in all 3 rats on the yoked variable-interval schedule. In Experiment 2, fixed-ratio and fixed-interval schedules with similar reinforcement densities maintained lever pressing. Defecation occurred in 3 of 4 rats on the fixed-ratio schedule and in 4 of 4 rats on the fixed-interval schedule. Almost no defecation occurred during continuous reinforcement in either experiment. These results demonstrate that defecation may occur during both ratio and interval schedules and that the inter-reinforcement interval is more important than the behavioral requirements of the schedule in generating schedule-induced defecation. PMID:8283152

  4. A System for Automatically Generating Scheduling Heuristics

    NASA Technical Reports Server (NTRS)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  5. Mission and science activity scheduling language

    NASA Technical Reports Server (NTRS)

    Hull, Larry G.

    1993-01-01

    To support the distributed and complex operational scheduling required for future National Aeronautics and Space Administration (NASA) missions, a formal, textual language, the Scheduling Applications Interface Language (SAIL), has been developed. Increased geographic dispersion of investigators is leading to distributed mission and science activity planning, scheduling, and operations. SAIL is an innovation which supports the effective and efficient communication of scheduling information among physically dispersed applications in distributed scheduling environments. SAIL offers a clear, concise, unambiguous expression of scheduling information in a readable, hardware independent format. The language concept, syntax, and semantics incorporate language features found useful during five years of research and prototyping with scheduling languages in physically distributed environments. SAIL allows concise specification of mission and science activity plans in a format which promotes repetition and reuse.

  6. Reactive Scheduling in Multipurpose Batch Plants

    NASA Astrophysics Data System (ADS)

    Narayani, A.; Shaik, Munawar A.

    2010-10-01

    Scheduling is an important operation in process industries for improving resource utilization resulting in direct economic benefits. It has a two-fold objective of fulfilling customer orders within the specified time as well as maximizing the plant profit. Unexpected disturbances such as machine breakdown, arrival of rush orders and cancellation of orders affect the schedule of the plant. Reactive scheduling is generation of a new schedule which has minimum deviation from the original schedule in spite of the occurrence of unexpected events in the plant operation. Recently, Shaik & Floudas (2009) proposed a novel unified model for short-term scheduling of multipurpose batch plants using unit-specific event-based continuous time representation. In this paper, we extend the model of Shaik & Floudas (2009) to handle reactive scheduling.

  7. A System for Automatically Generating Scheduling Heuristics

    NASA Technical Reports Server (NTRS)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  8. Scheduling of an aircraft fleet

    NASA Technical Reports Server (NTRS)

    Paltrinieri, Massimo; Momigliano, Alberto; Torquati, Franco

    1992-01-01

    Scheduling is the task of assigning resources to operations. When the resources are mobile vehicles, they describe routes through the served stations. To emphasize such aspect, this problem is usually referred to as the routing problem. In particular, if vehicles are aircraft and stations are airports, the problem is known as aircraft routing. This paper describes the solution to such a problem developed in OMAR (Operative Management of Aircraft Routing), a system implemented by Bull HN for Alitalia. In our approach, aircraft routing is viewed as a Constraint Satisfaction Problem. The solving strategy combines network consistency and tree search techniques.

  9. Scheduling Coast Guard District Cutters

    DTIC Science & Technology

    1992-09-01

    2G, B-2NY, B-2SAR, C); t - week the cutter assumes the patrol status. COSTO - cost of scheduling cutter i to patrol k; ( 1 if ship i is available for...29262a tII 1 ’• l1 1i ,1111’Iii 1 l l H I ,,,,,,,•~II ,, I.,,,.,,_ I 111 ............ ll Unclassified SECURITY CLASSIFICATION OF THIS PAGE REPORT...Postgraduate School (If applicable) Naval Postgraduate School 1 55 6c. ADDRESS (City, State, and ZIP Code) 7b. ADDRESS (City, State, and ZIP Code) Monterey

  10. Clustered schedules in allergen-specific immunotherapy.

    PubMed

    Parmiani, S; Fernández Távora, L; Moreno, C; Guardia, P; Rico, P

    2002-01-01

    Injective immunotherapy is traditionally performed with a build-up phase lasting 3 to 4 months. The costs, decreasing compliance from both patients and clinicians and inconveniences due to this schedule may be overcome using different schedules. A revision of the published papers with clustered schedules has been made. Attention has been focussed on tolerance and its relationships with relevant parameters such as kind of extract (aqueous or depot), allergens and their pharmaceutical presentation, schedule followed, use or not of a premedication, clinical manifestations of patients before treatment. For a better revision, papers dealing with clustered schedules have been divided into two groups. The first group includes 20 papers not designed to study the clustered schedule but using it to study other parameters affected by specific immunotherapy. The second group includes 9 papers specifically or mainly designed to study the clustered schedule. A huge difference in the rate of side effects could be assessed among different papers, even in studies run with similar allergens from the same producer and with a similar schedule. Summarizing the results of the revision, the following conditions seem to lead to the optimal tolerance of the clustered schedule: use of a premedication; use of a depot preparation; use of no more than 4 administrations per cluster; administration of 1-2 clusters per week and of 4 to 6 clusters in total. These results seem promising but further efforts are required to better define the optimal clustered schedule.

  11. Environmental surveillance master sampling schedule

    SciTech Connect

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.

  12. Steps Toward Optimal Competitive Scheduling

    NASA Technical Reports Server (NTRS)

    Frank, Jeremy; Crawford, James; Khatib, Lina; Brafman, Ronen

    2006-01-01

    This paper is concerned with the problem of allocating a unit capacity resource to multiple users within a pre-defined time period. The resource is indivisible, so that at most one user can use it at each time instance. However, different users may use it at different times. The users have independent, se@sh preferences for when and for how long they are allocated this resource. Thus, they value different resource access durations differently, and they value different time slots differently. We seek an optimal allocation schedule for this resource. This problem arises in many institutional settings where, e.g., different departments, agencies, or personal, compete for a single resource. We are particularly motivated by the problem of scheduling NASA's Deep Space Satellite Network (DSN) among different users within NASA. Access to DSN is needed for transmitting data from various space missions to Earth. Each mission has different needs for DSN time, depending on satellite and planetary orbits. Typically, the DSN is over-subscribed, in that not all missions will be allocated as much time as they want. This leads to various inefficiencies - missions spend much time and resource lobbying for their time, often exaggerating their needs. NASA, on the other hand, would like to make optimal use of this resource, ensuring that the good for NASA is maximized. This raises the thorny problem of how to measure the utility to NASA of each allocation. In the typical case, it is difficult for the central agency, NASA in our case, to assess the value of each interval to each user - this is really only known to the users who understand their needs. Thus, our problem is more precisely formulated as follows: find an allocation schedule for the resource that maximizes the sum of users preferences, when the preference values are private information of the users. We bypass this problem by making the assumptions that one can assign money to customers. This assumption is reasonable; a

  13. Schedule optimization study implementation plan

    SciTech Connect

    Not Available

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed.

  14. Schedules of controlled substances: rescheduling of hydrocodone combination products from schedule III to schedule II. Final rule.

    PubMed

    2014-08-22

    With the issuance of this final rule, the Administrator of the Drug Enforcement Administration reschedules hydrocodone combination products from schedule III to schedule II of the Controlled Substances Act. This scheduling action is pursuant to the Controlled Substances Act which requires that such actions be made on the record after opportunity for a hearing through formal rulemaking. This action imposes the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule II controlled substances on persons who handle (manufacture, distribute, dispense, import, export, engage in research, conduct instructional activities with, conduct chemical analysis with, or possess) or propose to handle hydrocodone combination products.

  15. Job Scheduling Under the Portable Batch System

    NASA Technical Reports Server (NTRS)

    Henderson, Robert L.; Woodrow, Thomas S. (Technical Monitor)

    1995-01-01

    The typical batch queuing system schedules jobs for execution by a set of queue controls. The controls determine from which queues jobs may be selected. Within the queue, jobs are ordered first-in, first-run. This limits the set of scheduling policies available to a site. The Portable Batch System removes this limitation by providing an external scheduling module. This separate program has full knowledge of the available queued jobs, running jobs, and system resource usage. Sites are able to implement any policy expressible in one of several procedural language. Policies may range from "bet fit" to "fair share" to purely political. Scheduling decisions can be made over the full set of jobs regardless of queue or order. The scheduling policy can be changed to fit a wide variety of computing environments and scheduling goals. This is demonstrated by the use of PBS on an IBM SP-2 system at NASA Ames.

  16. Job Scheduling Under the Portable Batch System

    NASA Technical Reports Server (NTRS)

    Henderson, Robert L.; Woodrow, Thomas S. (Technical Monitor)

    1995-01-01

    The typical batch queuing system schedules jobs for execution by a set of queue controls. The controls determine from which queues jobs may be selected. Within the queue, jobs are ordered first-in, first-run. This limits the set of scheduling policies available to a site. The Portable Batch System removes this limitation by providing an external scheduling module. This separate program has full knowledge of the available queued jobs, running jobs, and system resource usage. Sites are able to implement any policy expressible in one of several procedural language. Policies may range from "bet fit" to "fair share" to purely political. Scheduling decisions can be made over the full set of jobs regardless of queue or order. The scheduling policy can be changed to fit a wide variety of computing environments and scheduling goals. This is demonstrated by the use of PBS on an IBM SP-2 system at NASA Ames.

  17. Minimally disruptive schedule repair for MCM missions

    NASA Astrophysics Data System (ADS)

    Molineaux, Matthew; Auslander, Bryan; Moore, Philip G.; Gupta, Kalyan M.

    2015-05-01

    Mine countermeasures (MCM) missions entail planning and operations in very dynamic and uncertain operating environments, which pose considerable risk to personnel and equipment. Frequent schedule repairs are needed that consider the latest operating conditions to keep mission on target. Presently no decision support tools are available for the challenging task of MCM mission rescheduling. To address this capability gap, we have developed the CARPE system to assist operation planners. CARPE constantly monitors the operational environment for changes and recommends alternative repaired schedules in response. It includes a novel schedule repair algorithm called Case-Based Local Schedule Repair (CLOSR) that automatically repairs broken schedules while satisfying the requirement of minimal operational disruption. It uses a case-based approach to represent repair strategies and apply them to new situations. Evaluation of CLOSR on simulated MCM operations demonstrates the effectiveness of case-based strategy. Schedule repairs are generated rapidly, ensure the elimination of all mines, and achieve required levels of clearance.

  18. A hybrid job-shop scheduling system

    NASA Technical Reports Server (NTRS)

    Hellingrath, Bernd; Robbach, Peter; Bayat-Sarmadi, Fahid; Marx, Andreas

    1992-01-01

    The intention of the scheduling system developed at the Fraunhofer-Institute for Material Flow and Logistics is the support of a scheduler working in a job-shop. Due to the existing requirements for a job-shop scheduling system the usage of flexible knowledge representation and processing techniques is necessary. Within this system the attempt was made to combine the advantages of symbolic AI-techniques with those of neural networks.

  19. Intelligent perturbation algorithms to space scheduling optimization

    NASA Technical Reports Server (NTRS)

    Kurtzman, Clifford R.

    1991-01-01

    The limited availability and high cost of crew time and scarce resources make optimization of space operations critical. Advances in computer technology coupled with new iterative search techniques permit the near optimization of complex scheduling problems that were previously considered computationally intractable. Described here is a class of search techniques called Intelligent Perturbation Algorithms. Several scheduling systems which use these algorithms to optimize the scheduling of space crew, payload, and resource operations are also discussed.

  20. Spent nuclear fuel project integrated schedule plan

    SciTech Connect

    Squires, K.G.

    1995-03-06

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel.

  1. Computer-assisted warehouse personnel scheduling

    NASA Astrophysics Data System (ADS)

    Parker, Sandra C.; Malstrom, Eric J.; Usmani, Tariq

    1992-02-01

    A decision support system is developed for personnel scheduling in a multiple warehouse environment. The system incorporates current manpower level, historical data of workers used, empirical load distributions, and performance standards to generate manpower requirements for a specified planning horizon. The software has been developed to be easily adaptable to varying situational details, therefore is widely applicable in different warehouse settings. The system offers personnel managers a valuable tool for evaluating alternative schedules and making intelligent decisions regarding personnel scheduling in warehouses.

  2. Scheduling and SVTs: Rx for Efficiency

    DTIC Science & Technology

    2013-12-01

    to follow in scheduling. In July 2012, the Office of Performance Assessments and An X-47B Unmanned Combat Air System ( UCAS ) demonstrator flies...47B Unmanned Combat Air System ( UCAS ) demonstrator completes an arrested landing on the flight deck of the aircraft carrier USS George H.W. Bush...depends in part on the quality of its schedule. A well-formulated schedule can help Unmanned Combat Air System ( UCAS ) demonstrator launches from the

  3. Scheduling Options Utilized in Departments of Nursing.

    DTIC Science & Technology

    1983-09-01

    or system. Adequate data are not presented concerning design, base- line versus post evaluation , and long term follow-up even though some schedules...summarization and critique of various reported methodologies. Examples of non-traditional scheduling optio~s were described, evaluated for usefulness...services. However, with the present perceived nursing shortage and the dissatisfaction of nurses with con- ventional scheduling methods, a need to evaluate

  4. State Dependent Priority Rules for Scheduling.

    DTIC Science & Technology

    1984-07-01

    jobs have several alternative routings through the shop [30, 54], and the setup costs depend on the sequence of the jobs [7]. The allocation of...scheduling models . A hierarchical planning framework, similar to the concept in closed job shops [32, 34], would allow aggregate planning decisions as...mode, to generate and test schedules for longer time periods, such as weekly or monthly shop schedules and quarterly production

  5. Creating activity schedules using Microsoft Powerpoint.

    PubMed Central

    Rehfeldt, Ruth Anne; Kinney, Elisabeth M; Root, Shannon; Stromer, Robert

    2004-01-01

    We describe how PowerPoint presentation software can be used to create computer activity schedules to teach individuals with special needs. Presented are the steps involved in creating activity schedules with close-ended and open-ended activities, and for preparing schedules that include photos, sounds, text, and videos that can be used to occasion an individual's engagement in a variety of learning activities. PMID:15154226

  6. Creating activity schedules using Microsoft Powerpoint.

    PubMed

    Rehfeldt, Ruth Anne; Kinney, Elisabeth M; Root, Shannon; Stromer, Robert

    2004-01-01

    We describe how PowerPoint presentation software can be used to create computer activity schedules to teach individuals with special needs. Presented are the steps involved in creating activity schedules with close-ended and open-ended activities, and for preparing schedules that include photos, sounds, text, and videos that can be used to occasion an individual's engagement in a variety of learning activities.

  7. 29 CFR 1952.211 - Developmental schedule.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... schedule. (a) Occupational health study accepted and implementation begun July, 1973; (b) Compliance Manual... occupational health program, July, 1975; (m) Fully implemented public employees program, December, 1975; ...

  8. Tool for Merging Proposals Into DSN Schedules

    NASA Technical Reports Server (NTRS)

    Khanampornpan, Teerapat; Kwok, John; Call, Jared

    2008-01-01

    A Practical Extraction and Reporting Language (Perl) script called merge7da has been developed to facilitate determination, by a project scheduler in NASA's Deep Space Network, of whether a proposal for use of the DSN could create a conflict with the current DSN schedule. Prior to the development of merge7da, there was no way to quickly identify potential schedule conflicts: it was necessary to submit a proposal and wait a day or two for a response from a DSN scheduling facility. By using merge7da to detect and eliminate potential schedule conflicts before submitting a proposal, a project scheduler saves time and gains assurance that the proposal will probably be accepted. merge7da accepts two input files, one of which contains the current DSN schedule and is in a DSN-standard format called '7da'. The other input file contains the proposal and is in another DSN-standard format called 'C1/C2'. merge7da processes the two input files to produce a merged 7da-format output file that represents the DSN schedule as it would be if the proposal were to be adopted. This 7da output file can be loaded into various DSN scheduling software tools now in use.

  9. Empowering nurses through an innovative scheduling model.

    PubMed

    Maxson-Cooper, Pamela A

    2011-03-01

    In 1980, Froedtert Hospital opened its doors using an innovative registered nurse scheduling model. The hospital has grown to 500 beds, with over 1,600 registered nurses, and continues to use the 7/70 staffing pattern as a core scheduling model. Registered nurses work a straight seven, 10-hour days, and then have 1 week off, or 26 weeks off a year. For professional registered nurses in acute care, the schedule is predictable and consistent for years. This scheduling pattern has resulted in excellent registered nurse satisfaction, increased retention, and consistency in care delivery teams since 1980.

  10. 40 CFR 52.730 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... supporting information he considers necessary for proper certification. (ii) Any compliance schedule adopted..., 1973. lake county Morton Manufacturing Co Libertyville 205(f) Aug. 27, 1973. la salle county...

  11. Ada task scheduling: A focused Ada investigation

    NASA Technical Reports Server (NTRS)

    Legrand, Sue

    1988-01-01

    The types of control that are important for real time task scheduling are discussed. Some closely related real time issues are mentioned and major committee and research activities in this area are delineated. Although there are some problems with Ada and its real time task scheduling, Ada presents fewer than any known alternative. Ada was designed for the domain of real time embedded systems, but Ada compilers may not contain a level of task scheduling support that is adequate for all real time applications. The question addressed is which implementations of Ada's task scheduling are adequate for effective real time systems for NASA applications.

  12. A customizable, scalable scheduling and reporting system.

    PubMed

    Wood, Jody L; Whitman, Beverly J; Mackley, Lisa A; Armstrong, Robert; Shotto, Robert T

    2014-06-01

    Scheduling is essential for running a facility smoothly and for summarizing activities in use reports. The Penn State Hershey Clinical Simulation Center has developed a scheduling interface that uses off-the-shelf components, with customizations that adapt to each institution's data collection and reporting needs. The system is designed using programs within the Microsoft Office 2010 suite. Outlook provides the scheduling component, while the reporting is performed using Access or Excel. An account with a calendar is created for the main schedule, with separate resource accounts created for each room within the center. The Outlook appointment form's 2 default tabs are used, in addition to a customized third tab. The data are then copied from the calendar into either a database table or a spreadsheet, where the reports are generated.Incorporating this system into an institution-wide structure allows integration of personnel lists and potentially enables all users to check the schedule from their desktop. Outlook also has a Web-based application for viewing the basic schedule from outside the institution, although customized data cannot be accessed. The scheduling and reporting functions have been used for a year at the Penn State Hershey Clinical Simulation Center. The schedule has increased workflow efficiency, improved the quality of recorded information, and provided more accurate reporting. The Penn State Hershey Clinical Simulation Center's scheduling and reporting system can be adapted easily to most simulation centers and can expand and change to meet future growth with little or no expense to the center.

  13. Payload crew training scheduler (PACTS) user's manual

    NASA Technical Reports Server (NTRS)

    Shipman, D. L.

    1980-01-01

    The operation of the payload specialist training scheduler (PACTS) is discussed in this user's manual which is used to schedule payload specialists for mission training on the Spacelab experiments. The PACTS program is a fully automated interactive, computerized scheduling program equipped with tutorial displays. The tutorial displays are sufficiently detailed for use by a program analyst having no computer experience. The PACTS program is designed to operate on the UNIVAC 1108 computer system, and has the capability to load output into a PDP 11/45 Interactive Graphics Display System for printing schedules. The program has the capacity to handle up to three overlapping Spacelab missions.

  14. AVLIS production plant project schedule and milestones

    SciTech Connect

    Not Available

    1984-11-15

    An AVLIS Production Plant Deployment Schedule for the engineering, procurement, and construction for both the Initial Increment of Production and the fully Activated Plant, has been developed by the project team consisting of Lawrence Livermore National Laboratory, Martin Marietta Energy Systems, Inc. with architect-engineer support from Bechtel National, Inc., Stone and Webster Engineering Corporation, and Westinghouse Corporation. The initial deployment phase consists of six separators modules and the three laser power amplifier modules consistent with the FY84 reference design with a name plate capacity of 5 million separative work units/yr followed by a full plant activation to approximately 13 million separative work units/yr. The AVLIS Production Plant project team's strategy for deployment schedule analysis focused on three schedule options: engineering limited schedule; authorization limited schedule; and funding limited project schedule. The three deployment schedule options developed by AVLIS project team have been classified in ranges such as an optimistic, rapid/moderate, or moderate/pessimistic based on the probability of meeting the individual schedule option's major milestones or program objectives of enriching uranium by the AVLIS process in an effective cost and schedule manner. 47 figures, 7 tables.

  15. CASSIUS: The Cassini Uplink Scheduler

    NASA Technical Reports Server (NTRS)

    Bellinger, Earl

    2012-01-01

    The Cassini Uplink Scheduler (CASSIUS) is cross-platform software used to generate a radiation sequence plan for commands being sent to the Cassini spacecraft. Because signals must travel through varying amounts of Earth's atmosphere, several different modes of constant telemetry rates have been devised. These modes guarantee that the spacecraft and the Deep Space Network agree with respect to the data transmission rate. However, the memory readout of a command will be lost if it occurs on a telemetry mode boundary. Given a list of spacecraft message files as well as the available telemetry modes, CASSIUS can find an uplink sequence that ensures safe transmission of each file. In addition, it can predict when the two on-board solid state recorders will swap. CASSIUS prevents data corruption by making sure that commands are not planned for memory readout during telemetry rate changes or a solid state recorder swap.

  16. Environmental surveillance master sampling schedule

    SciTech Connect

    Bisping, L E

    1992-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. Samples for radiological analyses include Air-Particulate Filter, gases and vapor; Water/Columbia River, Onsite Pond, Spring, Irrigation, and Drinking; Foodstuffs/Animal Products including Whole Milk, Poultry and Eggs, and Beef; Foodstuffs/Produce including Leafy Vegetables, Vegetables, and Fruit; Foodstuffs/Farm Products including Wine, Wheat and Alfalfa; Wildlife; Soil; Vegetation; and Sediment. Direct Radiation Measurements include Terrestrial Locations, Columbia River Shoreline Locations, and Onsite Roadway, Railway and Aerial, Radiation Surveys.

  17. Toward Realistic Acquisition Schedule Estimates

    DTIC Science & Technology

    2016-04-30

    qÜáêíÉÉåíÜ=^ååì~ä= ^Åèìáëáíáçå=oÉëÉ~êÅÜ= póãéçëáìã= tÉÇåÉëÇ~ó=pÉëëáçåë= sçäìãÉ=f= = Toward Realistic Acquisition Schedule Estimates Raymond Franck, Professor...the Acquisition Research Program of the Graduate School of Business & Public Policy at the Naval Postgraduate School. To request defense acquisition ...research, to become a research sponsor, or to print additional copies of reports, please contact any of the staff listed on the Acquisition

  18. 19 CFR 162.45a - Summary forfeiture of Schedule I and Schedule II controlled substances.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY (CONTINUED) INSPECTION, SEARCH, AND SEIZURE....S.C. 965. Accordingly, in the case of a seizure of Schedule I or Schedule II controlled substances...

  19. 19 CFR 162.45a - Summary forfeiture of Schedule I and Schedule II controlled substances.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY (CONTINUED) INSPECTION, SEARCH, AND SEIZURE....S.C. 965. Accordingly, in the case of a seizure of Schedule I or Schedule II controlled substances...

  20. 19 CFR 162.45a - Summary forfeiture of Schedule I and Schedule II controlled substances.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY (CONTINUED) INSPECTION, SEARCH, AND SEIZURE....S.C. 965. Accordingly, in the case of a seizure of Schedule I or Schedule II controlled substances...

  1. 19 CFR 162.45a - Summary forfeiture of Schedule I and Schedule II controlled substances.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY (CONTINUED) INSPECTION, SEARCH, AND SEIZURE....S.C. 965. Accordingly, in the case of a seizure of Schedule I or Schedule II controlled substances...

  2. SO/ST/SRG - SCHEDULING PROGRAMS

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer, SO (COSMIC Program MSC-21525), Schedule Tracker, ST (COSMIC Program MSC-21526), and Report Generator, SRG (COSMIC Program MSC-21527), are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Organizer contains a primary menu that is displayed at the beginning of the program. The menu provides options as follows: to write input files to an output distribution file, to change a schedule title field and/or distribution list field, to browse through the schedule and input names file for requested schedule numbers, to create an input names file and a schedule titles file, and to delete input schedule titles and associated names. SO provides a choice of two input files. One file holds 25 groups of up to 25 names for each group. The other file holds 25 records. Each 60-character-long record holds a task schedule title or it is a blank entry. SO creates three output files. One holds the formatted list of schedule titles for printout. Another file holds the formatted distribution list for printout. There is one for each input names file schedule group. The third output file holds the schedule title of the last schedule title file deleted by the user. Schedule Tracker provides an effective method for tracking tasks that are "past due" and/or "near term". ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are scheduled for recent completion (near term

  3. SO/ST/SRG - SCHEDULING PROGRAMS

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer, SO (COSMIC Program MSC-21525), Schedule Tracker, ST (COSMIC Program MSC-21526), and Report Generator, SRG (COSMIC Program MSC-21527), are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Organizer contains a primary menu that is displayed at the beginning of the program. The menu provides options as follows: to write input files to an output distribution file, to change a schedule title field and/or distribution list field, to browse through the schedule and input names file for requested schedule numbers, to create an input names file and a schedule titles file, and to delete input schedule titles and associated names. SO provides a choice of two input files. One file holds 25 groups of up to 25 names for each group. The other file holds 25 records. Each 60-character-long record holds a task schedule title or it is a blank entry. SO creates three output files. One holds the formatted list of schedule titles for printout. Another file holds the formatted distribution list for printout. There is one for each input names file schedule group. The third output file holds the schedule title of the last schedule title file deleted by the user. Schedule Tracker provides an effective method for tracking tasks that are "past due" and/or "near term". ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are scheduled for recent completion (near term

  4. Robust Aircraft Squadron Scheduling in the Face of Absenteeism

    DTIC Science & Technology

    2008-03-01

    manually preparing robust schedules, resistant to changes on paper without any computer help. They try to manually preserve the balance between...But flight schedulers are still assigned to prepare a feasible flight schedule on paper . Schedulers desire to prepare a weekly robust schedule by...the mean of a scheduling model. The desire is for a robust schedule from paper to a computer, thus preparing a robust model will help the

  5. 49 CFR Schedule D to Subpart B of... - Schedule D to Subpart B of Part 1139

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 8 2010-10-01 2010-10-01 false Schedule D to Subpart B of Part 1139 D Schedule D... REVENUE PROCEEDINGS Intercity Bus Industry Pt. 1139, Subpt. B, Sch. D Schedule D to Subpart B of Part 1139... year 19__ (c) Calendar year 19__ (d) Base year actual (e) Part I.—Selected financial data...

  6. 49 CFR Schedule D to Subpart B of... - Schedule D to Subpart B of Part 1139

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 8 2013-10-01 2013-10-01 false Schedule D to Subpart B of Part 1139 D Schedule D... REVENUE PROCEEDINGS Intercity Bus Industry Pt. 1139, Subpt. B, Sch. D Schedule D to Subpart B of Part 1139... year 19__ (c) Calendar year 19__ (d) Base year actual (e) Part I.—Selected financial data...

  7. 49 CFR Schedule D to Subpart B of... - Schedule D to Subpart B of Part 1139

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 8 2014-10-01 2014-10-01 false Schedule D to Subpart B of Part 1139 D Schedule D... REVENUE PROCEEDINGS Intercity Bus Industry Pt. 1139, Subpt. B, Sch. D Schedule D to Subpart B of Part 1139... year 19__ (c) Calendar year 19__ (d) Base year actual (e) Part I.—Selected financial data...

  8. 49 CFR Schedule D to Subpart B of... - Schedule D to Subpart B of Part 1139

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 8 2011-10-01 2011-10-01 false Schedule D to Subpart B of Part 1139 D Schedule D... REVENUE PROCEEDINGS Intercity Bus Industry Pt. 1139, Subpt. B, Sch. D Schedule D to Subpart B of Part 1139... year 19__ (c) Calendar year 19__ (d) Base year actual (e) Part I.—Selected financial data...

  9. 49 CFR Schedule D to Subpart B of... - Schedule D to Subpart B of Part 1139

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 8 2012-10-01 2012-10-01 false Schedule D to Subpart B of Part 1139 D Schedule D... REVENUE PROCEEDINGS Intercity Bus Industry Pt. 1139, Subpt. B, Sch. D Schedule D to Subpart B of Part 1139... year 19__ (c) Calendar year 19__ (d) Base year actual (e) Part I.—Selected financial data...

  10. Actual and Preferred Work Schedules and Scheduling Control as Determinants of Job-Related Attitudes.

    ERIC Educational Resources Information Center

    Krausz, Moshe; Sagie, Abraham; Bidermann, Yehuda

    2000-01-01

    A study of 153 Israeli nurses (84 full time) tested the part-time/full-time dichotomy and a continuous scale of actual work schedules, finding neither significantly related to job satisfaction and commitment. Preferred work schedule and scheduling control were significant determinants of work attitudes. (SK)

  11. Construct Validity of the OASIS Interest Schedule.

    ERIC Educational Resources Information Center

    Parker, Randall M.; Green, Donald

    1987-01-01

    Scores of 135 community college students on the Occupational Aptitude Survey and Interest Schedule (OASIS) were compared with different academic majors. A series of 18 one-way analyses of variance provided evidence for the construct validity of the OASIS Interest Schedule. (Author/GDC)

  12. 29 CFR 1952.361 - Developmental schedule.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS New Mexico § 1952.361 Developmental schedule. The New Mexico State Plan is developmental. The following is the developmental schedule as... Mexico Occupational Health and Safety Review Commission by January 31, 1976. (d) Enforcement program...

  13. 7 CFR 283.29 - Scheduling conference.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Scheduling conference. 283.29 Section 283.29 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF... personal attendance by the ALJ and the parties or counsel at a scheduling conference is unwarranted or...

  14. 7 CFR 283.29 - Scheduling conference.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Scheduling conference. 283.29 Section 283.29 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF... personal attendance by the ALJ and the parties or counsel at a scheduling conference is unwarranted or...

  15. 7 CFR 283.29 - Scheduling conference.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Scheduling conference. 283.29 Section 283.29 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF... personal attendance by the ALJ and the parties or counsel at a scheduling conference is unwarranted or...

  16. Four-Day Week Schedule. Research Brief

    ERIC Educational Resources Information Center

    Marx, Gary E.

    2007-01-01

    What does research say about the four-day week as an alternative school schedule? More than 100 districts in at least 12 states currently use a four-day week alternative schedule. Most are located in rural areas, serve less than 1000 students, and made the move to a shorter school week with longer instructional days for financial reasons. Although…

  17. 45 CFR 96.137 - Payment schedule.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 1 2013-10-01 2013-10-01 false Payment schedule. 96.137 Section 96.137 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION BLOCK GRANTS Substance Abuse Prevention and Treatment Block Grant § 96.137 Payment schedule. (a) The Block Grant money that may be...

  18. 45 CFR 96.137 - Payment schedule.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Payment schedule. 96.137 Section 96.137 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION BLOCK GRANTS Substance Abuse Prevention and Treatment Block Grant § 96.137 Payment schedule. (a) The Block Grant money that may be...

  19. 45 CFR 96.137 - Payment schedule.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 1 2014-10-01 2014-10-01 false Payment schedule. 96.137 Section 96.137 Public Welfare Department of Health and Human Services GENERAL ADMINISTRATION BLOCK GRANTS Substance Abuse Prevention and Treatment Block Grant § 96.137 Payment schedule. (a) The Block Grant money that may be...

  20. 45 CFR 96.137 - Payment schedule.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 1 2012-10-01 2012-10-01 false Payment schedule. 96.137 Section 96.137 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION BLOCK GRANTS Substance Abuse Prevention and Treatment Block Grant § 96.137 Payment schedule. (a) The Block Grant money that may be...

  1. 45 CFR 96.137 - Payment schedule.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 1 2011-10-01 2011-10-01 false Payment schedule. 96.137 Section 96.137 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL ADMINISTRATION BLOCK GRANTS Substance Abuse Prevention and Treatment Block Grant § 96.137 Payment schedule. (a) The Block Grant money that may be...

  2. Observing the Use of Tactile Schedules

    ERIC Educational Resources Information Center

    Aasen, Gro; Naerland, Terje

    2014-01-01

    This article explores the use of tactile schedules in a heterogeneous sample of children with congenital blindness and varying degrees of additional disabilities. Basic conditions for the use of tactile schedules are proposed and discussed. Child behaviour indicative of some particular functions that can be attained with the use of tactile…

  3. 40 CFR 52.134 - Compliance schedules.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Compliance schedules. 52.134 Section 52.134 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Arizona § 52.134 Compliance schedules. (a) Federal...

  4. 40 CFR 52.134 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Compliance schedules. 52.134 Section 52.134 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Arizona § 52.134 Compliance schedules. (a) Federal...

  5. 40 CFR 52.134 - Compliance schedules.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Compliance schedules. 52.134 Section 52.134 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Arizona § 52.134 Compliance schedules. (a) Federal...

  6. 29 CFR 1952.351 - Developmental schedule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Arizona § 1952.351 Developmental schedule. The Arizona State plan is developmental. The following is the developmental schedule as provided by...) The formulation and approval of inter-agency agreements with the Arizona Atomic Energy Commission, the...

  7. 29 CFR 1952.351 - Developmental schedule.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Arizona § 1952.351 Developmental schedule. The Arizona State plan is developmental. The following is the developmental schedule as provided by...) The formulation and approval of inter-agency agreements with the Arizona Atomic Energy Commission, the...

  8. 29 CFR 1952.351 - Developmental schedule.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Arizona § 1952.351 Developmental schedule. The Arizona State plan is developmental. The following is the developmental schedule as provided by...) The formulation and approval of inter-agency agreements with the Arizona Atomic Energy Commission, the...

  9. 40 CFR 52.134 - Compliance schedules.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Compliance schedules. 52.134 Section 52.134 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Arizona § 52.134 Compliance schedules. (a) Federal...

  10. 29 CFR 1952.351 - Developmental schedule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Arizona § 1952.351 Developmental schedule. The Arizona State plan is developmental. The following is the developmental schedule as provided by...) The formulation and approval of inter-agency agreements with the Arizona Atomic Energy Commission, the...

  11. Evolutionary Scheduler for the Deep Space Network

    NASA Technical Reports Server (NTRS)

    Guillaume, Alexandre; Lee, Seungwon; Wang, Yeou-Fang; Zheng, Hua; Chau, Savio; Tung, Yu-Wen; Terrile, Richard J.; Hovden, Robert

    2010-01-01

    A computer program assists human schedulers in satisfying, to the maximum extent possible, competing demands from multiple spacecraft missions for utilization of the transmitting/receiving Earth stations of NASA s Deep Space Network. The program embodies a concept of optimal scheduling to attain multiple objectives in the presence of multiple constraints.

  12. 40 CFR 58.12 - Operating schedules.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.12 Operating schedules. State and local... part. Area-specific PAMS operating schedules must be included as part of the PAMS network description... for their area and that are within plus or minus 10 percent of the NAAQS; and all required sites...

  13. 40 CFR 58.12 - Operating schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.12 Operating schedules. State and local... part. Area-specific PAMS operating schedules must be included as part of the PAMS network description... regulatory data needs. Required SLAMS stations whose measurements determine the design value for their...

  14. 40 CFR 58.12 - Operating schedules.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) AMBIENT AIR QUALITY SURVEILLANCE Monitoring Network § 58.12 Operating schedules. State and local... part. Area-specific PAMS operating schedules must be included as part of the PAMS network description... regulatory data needs. Required SLAMS stations whose measurements determine the design value for their...

  15. 6 CFR 27.210 - Submissions schedule.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Submissions schedule. 27.210 Section 27.210 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.210 Submissions schedule. (a) Initial Submission....

  16. 6 CFR 27.210 - Submissions schedule.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 6 Domestic Security 1 2014-01-01 2014-01-01 false Submissions schedule. 27.210 Section 27.210 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.210 Submissions schedule. (a) Initial Submission....

  17. Improved MLWDF scheduler for LTE downlink transmission

    NASA Astrophysics Data System (ADS)

    Obinna Nnamani, Christantus; Anioke, Chidera Linda; Ikechukwu Ani, Cosmas

    2016-11-01

    In long-term evolution (LTE) downlink transmission, modified least weighted delay first (MLWDF) scheduler is a quality of service (QoS) aware scheduling scheme for real-time (RT) services. Nevertheless, MLWDF performs below optimal among the trade-off between strict delay and loss restraints of RT and non-RT traffic flows, respectively. This is further worsened with the implementation of hybrid automatic retransmission request (HARQ). As these restraints grow unabated with increasing number of user demands, the performance of MLWDF further reduces. In order to ameliorate this situation, there is a need to directly incorporate the variations in user demands and HARQ implementation as parameters to the MLWDF scheduler. In this work, an improvement to the MLWDF scheduler is proposed. The improvement entails adding two novel parameters that characterise user demand and HARQ implementation. The scheduler was tested using varying three classes of service in QoS class identifiers (QCIs) table standardised by Third Generation Partnership Project for LTE network to characterise different services. It was also tested on the basis of packet prioritisation. The proposed scheduler was simulated with LTE-SIM simulator and compared with the MLWDF and proportional fairness schedulers. In terms of delay, throughput and packet loss ratio; the proposed scheduler increased overall system performance.

  18. 40 CFR 52.524 - Compliance schedule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Compliance schedule. 52.524 Section 52.524 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Florida § 52.524 Compliance schedule. (a) The information...

  19. 40 CFR 716.60 - Reporting schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 30 2010-07-01 2010-07-01 false Reporting schedule. 716.60 Section 716.60 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT HEALTH AND SAFETY DATA REPORTING General Provisions § 716.60 Reporting schedule. (a) General requirements...

  20. 47 CFR 73.850 - Operating schedule.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Operating schedule. 73.850 Section 73.850 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Low Power FM Broadcast Stations (LPFM) § 73.850 Operating schedule. (a) All LPFM stations will...

  1. 47 CFR 73.850 - Operating schedule.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Operating schedule. 73.850 Section 73.850 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Low Power FM Broadcast Stations (LPFM) § 73.850 Operating schedule. (a) All LPFM stations will...

  2. Program For Editing Graphical Displays Of Schedules

    NASA Technical Reports Server (NTRS)

    Mulnix, Cassie L.; Miller, Kevin

    1995-01-01

    XOPPS is window-based software tool from graphics providing easy and fast "what you see is what you get" (WYSIWYG) on-screen editing capabilities. Provides area, analogous to canvas, displaying full image of schedule being edited. Canvas contains header area (for test) and schedule area (for plotting graphical representations of milestone objects in flexible time line). Written in C language.

  3. Incremental Scheduling Engines: Cost Savings through Automation

    NASA Technical Reports Server (NTRS)

    Jaap, John; Phillips, Shaun

    2005-01-01

    As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and ob.jectives are met and resources are not over-booked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper, presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks and those of their companion robots.

  4. 40 CFR 52.240 - Compliance schedules.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Compliance schedules. 52.240 Section 52.240 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.240 Compliance schedules. (a)...

  5. 44 CFR 72.3 - Fee schedule.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Fee schedule. 72.3 Section 72.3 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND... PROCESSING MAP CHANGES § 72.3 Fee schedule. (a) For requests for CLOMRs, LOMRs, and PMRs based on...

  6. Scheduling for deficit irrigation, Crop Yield Predictor

    USDA-ARS?s Scientific Manuscript database

    Irrigators in many countries with dwindling water supplies face the prospect that they will not be able to fully irrigate their crops. In these cases, they still need to schedule their water applications to make the best economic use of available water. Major scheduling questions for deficit irrigat...

  7. 29 CFR 1952.161 - Developmental schedule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Iowa § 1952.161 Developmental schedule. The Iowa State plan is developmental. The following is the developmental schedule as amended and provided by the plan: (a) Enabling legislation becomes effective (Chapter 88 of Iowa Code)—July 1972....

  8. 29 CFR 1952.161 - Developmental schedule.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Iowa § 1952.161 Developmental schedule. The Iowa State plan is developmental. The following is the developmental schedule as amended and provided by the plan: (a) Enabling legislation becomes effective (Chapter 88 of Iowa Code)—July 1972....

  9. 29 CFR 1952.161 - Developmental schedule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Iowa § 1952.161 Developmental schedule. The Iowa State plan is developmental. The following is the developmental schedule as amended and provided by the plan: (a) Enabling legislation becomes effective (Chapter 88 of Iowa Code)—July 1972....

  10. 29 CFR 1952.161 - Developmental schedule.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Iowa § 1952.161 Developmental schedule. The Iowa State plan is developmental. The following is the developmental schedule as amended and provided by the plan: (a) Enabling legislation becomes effective (Chapter 88 of Iowa Code)—July 1972....

  11. 29 CFR 1952.161 - Developmental schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Iowa § 1952.161 Developmental schedule. The Iowa State plan is developmental. The following is the developmental schedule as amended and provided by the plan: (a) Enabling legislation becomes effective (Chapter 88 of Iowa Code)—July 1972....

  12. 5 CFR 838.132 - Payment schedules.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... (CONTINUED) COURT ORDERS AFFECTING RETIREMENT BENEFITS Court Orders Generally Procedures Applicable to All Court Orders § 838.132 Payment schedules. (a) Under CSRS and FERS, employee annuities and survivor... accrues. (b) In honoring and complying with a court order, OPM will not disrupt the payment schedule...

  13. 5 CFR 838.132 - Payment schedules.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... (CONTINUED) COURT ORDERS AFFECTING RETIREMENT BENEFITS Court Orders Generally Procedures Applicable to All Court Orders § 838.132 Payment schedules. (a) Under CSRS and FERS, employee annuities and survivor... accrues. (b) In honoring and complying with a court order, OPM will not disrupt the payment schedule...

  14. 5 CFR 838.132 - Payment schedules.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... (CONTINUED) COURT ORDERS AFFECTING RETIREMENT BENEFITS Court Orders Generally Procedures Applicable to All Court Orders § 838.132 Payment schedules. (a) Under CSRS and FERS, employee annuities and survivor... accrues. (b) In honoring and complying with a court order, OPM will not disrupt the payment schedule...

  15. 5 CFR 838.132 - Payment schedules.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... (CONTINUED) COURT ORDERS AFFECTING RETIREMENT BENEFITS Court Orders Generally Procedures Applicable to All Court Orders § 838.132 Payment schedules. (a) Under CSRS and FERS, employee annuities and survivor... accrues. (b) In honoring and complying with a court order, OPM will not disrupt the payment schedule...

  16. 5 CFR 838.132 - Payment schedules.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... (CONTINUED) COURT ORDERS AFFECTING RETIREMENT BENEFITS Court Orders Generally Procedures Applicable to All Court Orders § 838.132 Payment schedules. (a) Under CSRS and FERS, employee annuities and survivor... accrues. (b) In honoring and complying with a court order, OPM will not disrupt the payment schedule...

  17. 40 CFR 52.626 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Compliance schedules. 52.626 Section 52.626 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.626 Compliance schedules. (a) (b) The...

  18. 29 CFR 1952.311 - Developmental schedule.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 9 2012-07-01 2012-07-01 false Developmental schedule. 1952.311 Section 1952.311 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Hawaii § 1952.311 Developmental schedule...

  19. 40 CFR 52.626 - Compliance schedules.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Compliance schedules. 52.626 Section 52.626 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.626 Compliance schedules. (a) (b) The...

  20. 29 CFR 1952.311 - Developmental schedule.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 9 2013-07-01 2013-07-01 false Developmental schedule. 1952.311 Section 1952.311 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Hawaii § 1952.311 Developmental schedule...

  1. 40 CFR 52.626 - Compliance schedules.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Compliance schedules. 52.626 Section 52.626 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.626 Compliance schedules. (a) (b) The...

  2. 29 CFR 1952.311 - Developmental schedule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 9 2014-07-01 2014-07-01 false Developmental schedule. 1952.311 Section 1952.311 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Hawaii § 1952.311 Developmental schedule...

  3. 40 CFR 52.626 - Compliance schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Compliance schedules. 52.626 Section 52.626 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.626 Compliance schedules. (a) (b) The...

  4. 40 CFR 52.626 - Compliance schedules.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Compliance schedules. 52.626 Section 52.626 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.626 Compliance schedules. (a) (b) The...

  5. 49 CFR 665.21 - Scheduling.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... TRANSPORTATION BUS TESTING Operations § 665.21 Scheduling. (a) To schedule a bus for testing, a manufacturer shall contact the operator of FTA's bus testing program. Contact information and procedures are available on the operator's bus testing Web site, http://www.altoonabustest.com. (b) Upon contacting...

  6. 49 CFR 665.21 - Scheduling.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... TRANSPORTATION BUS TESTING Operations § 665.21 Scheduling. (a) To schedule a bus for testing, a manufacturer shall contact the operator of FTA's bus testing program. Contact information and procedures are available on the operator's bus testing Web site, http://www.altoonabustest.com. (b) Upon contacting...

  7. 49 CFR 665.21 - Scheduling.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... TRANSPORTATION BUS TESTING Operations § 665.21 Scheduling. (a) To schedule a bus for testing, a manufacturer shall contact the operator of FTA's bus testing program. Contact information and procedures are available on the operator's bus testing Web site, http://www.altoonabustest.com. (b) Upon contacting...

  8. 49 CFR 665.21 - Scheduling.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... TRANSPORTATION BUS TESTING Operations § 665.21 Scheduling. (a) To schedule a bus for testing, a manufacturer shall contact the operator of FTA's bus testing program. Contact information and procedures are available on the operator's bus testing Web site, http://www.altoonabustest.com. (b) Upon contacting...

  9. 49 CFR 665.21 - Scheduling.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... TRANSPORTATION BUS TESTING Operations § 665.21 Scheduling. (a) To schedule a bus for testing, a manufacturer shall contact the operator of FTA's bus testing program. Contact information and procedures are available on the operator's bus testing Web site, http://www.altoonabustest.com. (b) Upon contacting...

  10. 40 CFR 716.60 - Reporting schedule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 31 2011-07-01 2011-07-01 false Reporting schedule. 716.60 Section 716.60 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) TOXIC SUBSTANCES CONTROL ACT HEALTH AND SAFETY DATA REPORTING General Provisions § 716.60 Reporting schedule. (a) General...

  11. 44 CFR 72.3 - Fee schedule.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Fee schedule. 72.3 Section 72.3 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND... PROCESSING MAP CHANGES § 72.3 Fee schedule. (a) For requests for CLOMRs, LOMRs, and PMRs based on structural...

  12. 44 CFR 72.3 - Fee schedule.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Fee schedule. 72.3 Section 72.3 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND... PROCESSING MAP CHANGES § 72.3 Fee schedule. (a) For requests for CLOMRs, LOMRs, and PMRs based on structural...

  13. 44 CFR 72.3 - Fee schedule.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Fee schedule. 72.3 Section 72.3 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND... PROCESSING MAP CHANGES § 72.3 Fee schedule. (a) For requests for CLOMRs, LOMRs, and PMRs based on structural...

  14. 40 CFR 52.1175 - Compliance schedules.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... have not been submitted for every source for which they are required. (d) Federal compliance schedules. (1) Except as provided in paragraph (d)(3) of this section, the owner or operator of any stationary... schedule, whether or not the increment has been met. (3)(i) Paragraphs (d) (1) and (2) of this section...

  15. 15 CFR 700.14 - Preferential scheduling.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 2 2011-01-01 2011-01-01 false Preferential scheduling. 700.14 Section 700.14 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued... DEFENSE PRIORITIES AND ALLOCATIONS SYSTEM Industrial Priorities § 700.14 Preferential scheduling. (a) A...

  16. 15 CFR 700.14 - Preferential scheduling.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 2 2010-01-01 2010-01-01 false Preferential scheduling. 700.14 Section 700.14 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued... DEFENSE PRIORITIES AND ALLOCATIONS SYSTEM Industrial Priorities § 700.14 Preferential scheduling. (a) A...

  17. 46 CFR 308.503 - Rate schedules.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Cargo Insurance I-Introduction § 308.503 Rate schedules. Rate schedules published by the Maritime... Maritime Administrator at any time without notice. If no rate is published for a voyage on which war...

  18. Observing the Use of Tactile Schedules

    ERIC Educational Resources Information Center

    Aasen, Gro; Naerland, Terje

    2014-01-01

    This article explores the use of tactile schedules in a heterogeneous sample of children with congenital blindness and varying degrees of additional disabilities. Basic conditions for the use of tactile schedules are proposed and discussed. Child behaviour indicative of some particular functions that can be attained with the use of tactile…

  19. 10 CFR 51.15 - Time schedules.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Time schedules. 51.15 Section 51.15 Energy NUCLEAR... REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2) § 51.15 Time... proposed action or a petitioner for rulemaking shall, establish a time schedule for all or any constituent...

  20. 10 CFR 51.15 - Time schedules.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Time schedules. 51.15 Section 51.15 Energy NUCLEAR... REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2) § 51.15 Time... proposed action or a petitioner for rulemaking shall, establish a time schedule for all or any constituent...

  1. 33 CFR 242.6 - Fee schedule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... MANAGEMENT SERVICES PROGRAM ESTABLISHMENT OF FEES FOR COST RECOVERY § 242.6 Fee schedule. (a) General. The... Services requiring more than ten minutes and up to one work day to provide. The Fee Schedule has been... total costs for services provided to Federal agencies and private persons. (b) Level of effort....

  2. 10 CFR 51.15 - Time schedules.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Time schedules. 51.15 Section 51.15 Energy NUCLEAR... REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2) § 51.15 Time... proposed action or a petitioner for rulemaking shall, establish a time schedule for all or any constituent...

  3. 10 CFR 51.15 - Time schedules.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Time schedules. 51.15 Section 51.15 Energy NUCLEAR... REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2) § 51.15 Time... proposed action or a petitioner for rulemaking shall, establish a time schedule for all or any constituent...

  4. 10 CFR 51.15 - Time schedules.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Time schedules. 51.15 Section 51.15 Energy NUCLEAR... REGULATORY FUNCTIONS National Environmental Policy Act-Regulations Implementing Section 102(2) § 51.15 Time... proposed action or a petitioner for rulemaking shall, establish a time schedule for all or any constituent...

  5. 46 CFR 525.2 - Terminal schedules.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MARITIME COMMISSION REGULATIONS AFFECTING OCEAN SHIPPING IN FOREIGN COMMERCE MARINE TERMINAL OPERATOR... their own negligence, or that impose upon others the obligation to indemnify or hold-harmless the terminals from liability for their own negligence. (2) Enforcement of terminal schedules. Any schedule...

  6. 46 CFR 525.2 - Terminal schedules.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... MARITIME COMMISSION REGULATIONS AFFECTING OCEAN SHIPPING IN FOREIGN COMMERCE MARINE TERMINAL OPERATOR... their own negligence, or that impose upon others the obligation to indemnify or hold-harmless the terminals from liability for their own negligence. (2) Enforcement of terminal schedules. Any schedule...

  7. 46 CFR 525.2 - Terminal schedules.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... MARITIME COMMISSION REGULATIONS AFFECTING OCEAN SHIPPING IN FOREIGN COMMERCE MARINE TERMINAL OPERATOR... their own negligence, or that impose upon others the obligation to indemnify or hold-harmless the terminals from liability for their own negligence. (2) Enforcement of terminal schedules. Any schedule...

  8. 46 CFR 525.2 - Terminal schedules.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MARITIME COMMISSION REGULATIONS AFFECTING OCEAN SHIPPING IN FOREIGN COMMERCE MARINE TERMINAL OPERATOR... their own negligence, or that impose upon others the obligation to indemnify or hold-harmless the terminals from liability for their own negligence. (2) Enforcement of terminal schedules. Any schedule...

  9. 37 CFR 2.85 - Classification schedules.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2012-07-01 2012-07-01 false Classification schedules. 2..., DEPARTMENT OF COMMERCE RULES OF PRACTICE IN TRADEMARK CASES Classification § 2.85 Classification schedules. (a) International classification system. Section 6.1 of this chapter sets forth the international...

  10. 37 CFR 2.85 - Classification schedules.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2013-07-01 2013-07-01 false Classification schedules. 2..., DEPARTMENT OF COMMERCE RULES OF PRACTICE IN TRADEMARK CASES Classification § 2.85 Classification schedules. (a) International classification system. Section 6.1 of this chapter sets forth the international...

  11. 37 CFR 2.85 - Classification schedules.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2014-07-01 2014-07-01 false Classification schedules. 2..., DEPARTMENT OF COMMERCE RULES OF PRACTICE IN TRADEMARK CASES Classification § 2.85 Classification schedules. (a) International classification system. Section 6.1 of this chapter sets forth the international...

  12. Soil water monitoring equipment for irrigation scheduling

    USDA-ARS?s Scientific Manuscript database

    Equipment for monitoring soil water content and sometimes bulk electrical conductivity can be used for scheduling irrigations if the accuracy of the equipment is sufficient to avoid damanging plants and wasting water and fertilizer. Irrigation scheduling is the process of deciding when to irrigate a...

  13. 37 CFR 2.85 - Classification schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 37 Patents, Trademarks, and Copyrights 1 2010-07-01 2010-07-01 false Classification schedules. 2..., DEPARTMENT OF COMMERCE RULES OF PRACTICE IN TRADEMARK CASES Classification § 2.85 Classification schedules. (a) International classification system. Section 6.1 of this chapter sets forth the international...

  14. Patient Scheduling with a Personal Touch

    PubMed Central

    Durst, Stephen

    1989-01-01

    What once required extensive manual effort and coordination has been reduced to a single access point for patient data collection and scheduling. Over half of the one million patients seen yearly by a large multi-specialty physicians' group are handled with an automated scheduling system with patient sensitivity as the main priority.

  15. 11 CFR 9006.3 - Alphabetized schedules.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 11 Federal Elections 1 2010-01-01 2010-01-01 false Alphabetized schedules. 9006.3 Section 9006.3 Federal Elections FEDERAL ELECTION COMMISSION PRESIDENTIAL ELECTION CAMPAIGN FUND: GENERAL ELECTION FINANCING REPORTS AND RECORDKEEPING § 9006.3 Alphabetized schedules. If the authorized committee(s) of...

  16. Management Matters. Changing to Flexible Scheduling

    ERIC Educational Resources Information Center

    Pappas, Marjorie L.

    2005-01-01

    Elementary school library media specialists state that one of the most frustrating issues they face is the fixed schedules in their library media centers. Beyond the cost effectiveness issue, the fixed schedule severely limits using the resources of the library media center for inquiry learning and collaborative teaching experiences between the…

  17. 40 CFR 63.1291 - Compliance schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... for Hazardous Air Pollutants for Flexible Polyurethane Foam Production § 63.1291 Compliance schedule... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Compliance schedule. 63.1291 Section 63.1291 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED...

  18. Program For Editing Graphical Displays Of Schedules

    NASA Technical Reports Server (NTRS)

    Mulnix, Cassie L.; Miller, Kevin

    1995-01-01

    XOPPS is window-based software tool from graphics providing easy and fast "what you see is what you get" (WYSIWYG) on-screen editing capabilities. Provides area, analogous to canvas, displaying full image of schedule being edited. Canvas contains header area (for test) and schedule area (for plotting graphical representations of milestone objects in flexible time line). Written in C language.

  19. Creating a Complex Schedule with "REFLEX."

    ERIC Educational Resources Information Center

    Kren, George M.; Christakes, George

    1991-01-01

    Discusses "REFLEX," a software package for scheduling. Explores the program's applications in preparing a departmental class schedule. Explains that "REFLEX" includes a filter function and some attributes of a spreadsheet but lacks the ability to interact with other databases. Concludes that the program can make scheduling…

  20. 40 CFR 52.1524 - Compliance schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Compliance schedules. 52.1524 Section 52.1524 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Hampshire § 52.1524 Compliance schedules...

  1. 7 CFR 1.18 - Fee schedule.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Fee schedule. 1.18 Section 1.18 Agriculture Office of the Secretary of Agriculture ADMINISTRATIVE REGULATIONS Official Records § 1.18 Fee schedule. Pursuant to § 2.28 of this title, the Chief Financial Officer is delegated authority to promulgate...

  2. 7 CFR 1.18 - Fee schedule.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 1 2013-01-01 2013-01-01 false Fee schedule. 1.18 Section 1.18 Agriculture Office of the Secretary of Agriculture ADMINISTRATIVE REGULATIONS Official Records § 1.18 Fee schedule. Pursuant to § 2.28 of this title, the Chief Financial Officer is delegated authority to promulgate...

  3. 33 CFR 242.6 - Fee schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... based on a Corps-wide average of estimated current costs for providing that level of service. (f) Review... most current cost data available. If necessary, the Fee Schedule will be revised after public notice... MANAGEMENT SERVICES PROGRAM ESTABLISHMENT OF FEES FOR COST RECOVERY § 242.6 Fee schedule. (a) General....

  4. State Teacher Salary Schedules. Policy Analysis

    ERIC Educational Resources Information Center

    Griffith, Michael

    2016-01-01

    In the United States most teacher compensation issues are decided at the school district level. However, a group of states have chosen to play a role in teacher pay decisions by instituting statewide teacher salary schedules. Education Commission of the States has found that 17 states currently make use of teacher salary schedules. This education…

  5. 14 CFR 415.121 - Launch schedule.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Launch schedule. 415.121 Section 415.121... TRANSPORTATION LICENSING LAUNCH LICENSE Safety Review and Approval for Launch of an Expendable Launch Vehicle From a Non-Federal Launch Site § 415.121 Launch schedule. An applicant's safety review document...

  6. 14 CFR 415.121 - Launch schedule.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Launch schedule. 415.121 Section 415.121... TRANSPORTATION LICENSING LAUNCH LICENSE Safety Review and Approval for Launch of an Expendable Launch Vehicle From a Non-Federal Launch Site § 415.121 Launch schedule. An applicant's safety review document...

  7. Religion as Schedule-Induced Behavior

    ERIC Educational Resources Information Center

    Strand, Paul S.

    2009-01-01

    In this article, I argue that a class of religious behaviors exists that is induced, for prepared organisms, by specific stimuli that are experienced according to a response-independent schedule. Like other schedule-induced behaviors, the members of this class serve as minimal units out of which functional behavior may arise. In this way, there…

  8. A Comprehensive University Scheduling System. CUSS.

    ERIC Educational Resources Information Center

    Abell, Victor A.; And Others

    These 2 papers describe the development of a computerized class scheduling system aimed at achieving uniform and efficient utilization of staff and physical facilities and a schedule that permits the maximum number of students to fulfill their curricular requirements. In "An Introduction to CUSS," Victor Abell describes the development…

  9. "Contingency" or "Career" Schedules for Women.

    ERIC Educational Resources Information Center

    Bernard, Jessie

    1978-01-01

    The notion of contingency scheduling for women is presented in this discussion of how women schedule their futures--marriage, child-bearing, professional training, and career development--and how colleges and universities can be more responsive to their needs. (Author/AF)

  10. 42 CFR 412.610 - Assessment schedule.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 2 2011-10-01 2011-10-01 false Assessment schedule. 412.610 Section 412.610 Public... Hospitals and Rehabilitation Units § 412.610 Assessment schedule. (a) General. For each Medicare Part A fee... must complete a patient assessment instrument as specified in § 412.606 that covers a time period that...

  11. 42 CFR 412.610 - Assessment schedule.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Assessment schedule. 412.610 Section 412.610 Public... Hospitals and Rehabilitation Units § 412.610 Assessment schedule. (a) General. For each Medicare Part A fee... must complete a patient assessment instrument as specified in § 412.606 that covers a time period that...

  12. 40 CFR 52.1482 - Compliance schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Compliance schedules. 52.1482 Section 52.1482 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Nevada § 52.1482 Compliance schedules....

  13. 40 CFR 52.1482 - Compliance schedules.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 4 2014-07-01 2014-07-01 false Compliance schedules. 52.1482 Section 52.1482 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Nevada § 52.1482 Compliance schedules....

  14. 40 CFR 52.1482 - Compliance schedules.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 4 2013-07-01 2013-07-01 false Compliance schedules. 52.1482 Section 52.1482 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Nevada § 52.1482 Compliance schedules....

  15. 40 CFR 52.1482 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Compliance schedules. 52.1482 Section 52.1482 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Nevada § 52.1482 Compliance schedules....

  16. Routine Operational Environmental Monitoring schedule, CY 1994

    SciTech Connect

    Schmidt, J.W.

    1993-12-01

    This document provides Health Physics (HP) a schedule in accordance with the Environmental Compliance Manual, WHC-CM-7-5, of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) Program during calendar year (CY) 1994. The survey frequencies for particular sites are determined by the technical judgment of EES and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive waste sites are scheduled to be surveyed annually at a minimum. Any newly discovered waste sites not documented by this schedule will be included in the revised schedule for CY 1995. This schedule does not discuss the manpower needs nor does it list the monitoring equipment to be used in completing specific routines.

  17. Integrated online job-shop scheduling system

    NASA Astrophysics Data System (ADS)

    Zhao, Xing; Chen, Kuan H.; Luh, Peter B.; Chiueh, T. D.; Chang, ShihChang; Thakur, Lakshman S.

    1999-11-01

    The rapid development of information technology and e- commerce requires fast response form scheduling systems. Based on the Lagrangian relaxation approach for job shop scheduling, this paper present an integrated system that will generate schedules quickly. The Lagrangian relaxation approach is an iterative optimization process, where dynamic programming is solved in each iteration. Since dynamic programming is computational expensive especially for large problems, this paper develops the simplified dynamic programming, which will cut the computation time of each iteration by one order. Furthermore, a digital circuit to be embedded in PC is designed to implement the iterative optimization algorithm, leading to another order of speed improvement. The resulting integrated scheduling system consists of the hardware for optimization and the related software. It is estimated that two orders of magnitude gain in speed can be obtained, which will make on-line scheduling for practical job shops possible.

  18. NASA Instrument Cost/Schedule Model

    NASA Technical Reports Server (NTRS)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  19. Human choice under schedules of negative reinforcement.

    PubMed

    Alessandri, Jérôme; Cançado, Carlos R X

    2015-12-01

    The generalized matching equation provides a good description of response allocation in concurrent schedules of positive reinforcement in nonhumans as well as in humans. The present experiment was conducted to further investigate the allocation of responding under concurrent schedules of negative reinforcement (i.e., timeouts from pressing a force cell) in humans. Each of three participants was exposed to different reinforcement ratios (9:1, 1:1 and 1:9) in the terminal links of a concurrent-chains schedule of negative reinforcement. The allocation of responding under this schedule was well described by the generalized matching equation, for each participant. These results replicate previous findings obtained with nonhumans and humans under concurrent schedules of positive reinforcement. In addition, they extend the results reported by Alessandri and Rivière (2013) showing that human behavior maintained by timeouts from an effortful response is sensitive to changes in relative reinforcement ratios as well as relative delays of reinforcement.

  20. NASA Instrument Cost/Schedule Model

    NASA Technical Reports Server (NTRS)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  1. Characteristics and costs of surgical scheduling errors.

    PubMed

    Wu, Rebecca L; Aufses, Arthur H

    2012-10-01

    Errors that increase the risk of wrong-side/-site procedures not only occur the day of surgery but also are often introduced much earlier during the scheduling process. The frequency of these booking errors and their effects are unclear. All surgical scheduling errors reported in the institution's medical event reporting system from January 1, 2011, to July 31, 2011, were analyzed. Focus groups with operating room nurses were held to discuss delays caused by scheduling errors. Of 17,606 surgeries, there were 151 (.86%) booking errors. The most common errors were wrong side (55, 36%), incomplete (38, 25%), and wrong approach (25, 17%). Focus group participants said incomplete and wrong-approach bookings resulted in the longest delays, averaging 20 minutes and costing at least $320. Although infrequent, scheduling errors disrupt operating room team dynamics, causing delays and bearing substantial costs. Further research is necessary to develop tools for more accurate scheduling. Copyright © 2012 Elsevier Inc. All rights reserved.

  2. Observation scheduling scheme for the Subaru telescope

    NASA Astrophysics Data System (ADS)

    Sasaki, Toshiyuki; Kosugi, George; Kawai, Jun A.; Kusumoto, Toyoaki; Koura, Norikazu; Hawkins, Robert; Kramer, Laurence; Krueger, Anthony P.; Miller, Glenn E.

    2000-06-01

    Optimization of observation sequences is a function necessary to get high efficiency and reliability of observations. We are now implementing scheduling software into the observation software system for Subaru telescope. The scheduling engine, SPIKE, developed at STScI is used with some modification for the Subaru telescope. An observation target list prepared by observers is converted to SPIKE Lisp codes. SPIKE output is inversely converted to Subaru commands to be executed with the observation software system. Real-time scheduling is planned to re-schedule observations by judging the weather and satisfaction conditions with the help of observation history. The scheduling software can be also used as support tools for observers to indicate an object good for the next observation.

  3. Scheduling mammograms for asymptomatic women

    SciTech Connect

    Gohagan, J.K.; Darby, W.P.; Spitznagel, E.L.; Tome, A.E.

    1988-03-01

    A decision theoretic model was used to investigate the relative importance of risk level, radiation hazard, mammographic accuracy, and cost in mammographic screening decision. The model uses woman-specific medical and family history facts and clinic-specific information regarding mammographic accuracy and practice to profile both woman and clinic, and to formulate periodic screening recommendations. Model parameters were varied extensively to investigate the sensitivity of screening schedules to input values. Multivariate risk was estimated within the program using published data from the Breast Cancer Detection Demonstration Project 5-year follow-up study. Radiation hazard estimates were developed from published radiation physics and radioepidemiologic risk data. Benchmark values for mammographic sensitivity and specificity under screening conditions were calculated from Breast Cancer Detection Demonstration Project data. Procedural costs used in the analysis were varied around values reflecting conditions at the Washington University Medical Center. Mortality advantages of early versus late breast cancer detection were accounted for using Health Insurance Plan of New York case survival rates. Results are compared with published screening policies to provide insight into implicit assumptions behind those policies. This analysis emphasizes the importance of accounting for variations in clinical accuracy under screening circumstances, in costs, in radiation exposure, and in woman-specific risk when recommending mammographic screening.

  4. 5 CFR 610.121 - Establishment of work schedules.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 5 Administrative Personnel 1 2013-01-01 2013-01-01 false Establishment of work schedules. 610.121... DUTY Weekly and Daily Scheduling of Work Work Schedules § 610.121 Establishment of work schedules. (a... schedule the work of his or her employees to accomplish the mission of the agency. The head of an agency...

  5. Clinch River Breeder Reactor Plant Project: construction schedule

    SciTech Connect

    Purcell, W.J.; Martin, E.M.; Shivley, J.M.

    1982-01-01

    The construction schedule for the Clinch River Breeder Reactor Plant and its evolution are described. The initial schedule basis, changes necessitated by the evaluation of the overall plant design, and constructability improvements that have been effected to assure adherence to the schedule are presented. The schedule structure and hierarchy are discussed, as are tools used to define, develop, and evaluate the schedule.

  6. The comparison of predictive scheduling algorithms for different sizes of job shop scheduling problems

    NASA Astrophysics Data System (ADS)

    Paprocka, I.; Kempa, W. M.; Grabowik, C.; Kalinowski, K.; Krenczyk, D.

    2016-08-01

    In the paper a survey of predictive and reactive scheduling methods is done in order to evaluate how the ability of prediction of reliability characteristics influences over robustness criteria. The most important reliability characteristics are: Mean Time to Failure, Mean Time of Repair. Survey analysis is done for a job shop scheduling problem. The paper answers the question: what method generates robust schedules in the case of a bottleneck failure occurrence before, at the beginning of planned maintenance actions or after planned maintenance actions? Efficiency of predictive schedules is evaluated using criteria: makespan, total tardiness, flow time, idle time. Efficiency of reactive schedules is evaluated using: solution robustness criterion and quality robustness criterion. This paper is the continuation of the research conducted in the paper [1], where the survey of predictive and reactive scheduling methods is done only for small size scheduling problems.

  7. Scheduling parallel programs in distributed systems

    SciTech Connect

    Rommel, C.G.

    1988-01-01

    Scheduling parallel programs under the processor-sharing discipline for uniprocessors, multiprocessors, and distributed systems was studied. Two classes of parallel programs are considered: those without any IPC (called Fork-Join jobs) and those with asynchronous and uniform IPC (called clusters). The study is divided into two parts: (1) develops analytical solutions for Fork-Join Jobs on uniprocessors and multiprocessors; and (2) develops and evaluates via simulation Fork-Join jobs and clusters on distributed systems. The types of site scheduling studied are TS-PS where tasks of a job are scheduled independently at processor-sharing servers, JS-PS in which tasks of a job are scheduled as a single entity at processor-sharing servers, and FCFS where tasks of a job are scheduled independently by order of arrival. For Poisson job arrivals and exponentially distributed task service times, analytical solutions and computationally efficient bounds were found for Fork-Join TS-PS and JS-PS job response times. An algorithm was developed to schedule parallel programs in distributed systems. Over a wide range of parameters the algorithms was found to be superior to both no-load balancing, NLB, and shortest-queue first scheduling, SQF.

  8. NRC comprehensive records disposition schedule. Revision 3

    SciTech Connect

    1998-02-01

    Title 44 US Code, ``Public Printing and Documents,`` regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ``Management and Use of Information and Records,`` and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ``Records Management,`` require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA`s General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ``NRC`s Comprehensive Records Disposition Schedule,`` and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA`s General Records Schedule (dated August 1995).

  9. Schedule-Aware Workflow Management Systems

    NASA Astrophysics Data System (ADS)

    Mans, Ronny S.; Russell, Nick C.; van der Aalst, Wil M. P.; Moleman, Arnold J.; Bakker, Piet J. M.

    Contemporary workflow management systems offer work-items to users through specific work-lists. Users select the work-items they will perform without having a specific schedule in mind. However, in many environments work needs to be scheduled and performed at particular times. For example, in hospitals many work-items are linked to appointments, e.g., a doctor cannot perform surgery without reserving an operating theater and making sure that the patient is present. One of the problems when applying workflow technology in such domains is the lack of calendar-based scheduling support. In this paper, we present an approach that supports the seamless integration of unscheduled (flow) and scheduled (schedule) tasks. Using CPN Tools we have developed a specification and simulation model for schedule-aware workflow management systems. Based on this a system has been realized that uses YAWL, Microsoft Exchange Server 2007, Outlook, and a dedicated scheduling service. The approach is illustrated using a real-life case study at the AMC hospital in the Netherlands. In addition, we elaborate on the experiences obtained when developing and implementing a system of this scale using formal techniques.

  10. Observation scheduling tools for Subaru Telescope

    NASA Astrophysics Data System (ADS)

    Sasaki, Toshiyuki; Kosugi, George; Hawkins, Robert; Kawai, Jun A.; Kusumoto, Toyoaki

    2004-09-01

    Optimization of observation sequences is a function necessary to get high efficiency and reliability of observations. We have implemented scheduling software in the Subaru Telescope observatory software system. The scheduling engine, Spike, developed at STScI is used with some modification for Subaru Telescope. Since the last report at SPIE (Munich, 2000), new functions to Spike are implemented on 1) optimized arrangement of an observation dataset, which consists of a target object and related calibrations, and 2) flexible scheduling of standard stars selected out of a standard star list, which is fed to Spike as a part of observation datasets. Observation datasets with some necessary information, prepared by an observer, are input to the scheduling tools to be converted to Spike Lisp input forms. A schedule created by Spike is inversely converted to Subaru observation commands to be executed with the observation control system. These applications are operable with Web-based display. We present an overall structure of the scheduling tools with some samples of Subaru observation commands of target datasets and a resultant schedule.

  11. Observing of chain-schedule stimuli.

    PubMed

    Slezak, Jonathan M; Anderson, Karen G

    2014-06-01

    A classical-conditioning account of the processes maintaining behavior under chained schedules entails a backward transmission of conditioned-reinforcement effects. Assessing this process in traditional chain schedules is limited because the response maintained by stimulus onset accompanied by each link in a chain schedule may also be maintained by the primary reinforcer. In the present experiment, an observing response was used to measure the conditioned-reinforcing effects of stimuli associated with a three-link chain variable-time (VT) food schedule, and resistance-to-change tests (extinction and prefeeding) were implemented to examine if a backward transmission of reinforcement effects occur. Four pigeons served as subjects. Observing was maintained by the production of stimuli correlated with links of a three-link chain VT schedule with the middle-link stimulus maintaining the highest rate of observing, followed by the initial-link stimulus and the terminal-link stimulus maintaining the lowest observing rate. Results from resistance-to-change tests of extinction and prefeeding were not supportive of a backward transmission of reinforcement effects and in general, the pattern of resistance-to-change was forward. Based on past and current research, it appears that a backward pattern of relative rate decreases in responses maintained by stimuli correlated with a chain schedule due to disruption (i.e., extinction and prefeeding) is not a ubiquitous process that is evident within different chain-schedule arrangements.

  12. Mission Operations Planning and Scheduling System (MOPSS)

    NASA Technical Reports Server (NTRS)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  13. Mixed-Integer Formulations for Constellation Scheduling

    NASA Astrophysics Data System (ADS)

    Valicka, C.; Hart, W.; Rintoul, M.

    Remote sensing systems have expanded the set of capabilities available for and critical to national security. Cooperating, high-fidelity sensing systems and growing mission applications have exponentially increased the set of potential schedules. A definitive lack of advanced tools places an increased burden on operators, as planning and scheduling remain largely manual tasks. This is particularly true in time-critical planning activities where operators aim to accomplish a large number of missions through optimal utilization of single or multiple sensor systems. Automated scheduling through identification and comparison of alternative schedules remains a challenging problem applicable across all remote sensing systems. Previous approaches focused on a subset of sensor missions and do not consider ad-hoc tasking. We have begun development of a robust framework that leverages the Pyomo optimization modeling language for the design of a tool to assist sensor operators planning under the constraints of multiple concurrent missions and uncertainty. Our scheduling models have been formulated to address the stochastic nature of ad-hoc tasks inserted under a variety of scenarios. Operator experience is being leveraged to select appropriate model objectives. Successful development of the framework will include iterative development of high-fidelity mission models that consider and expose various schedule performance metrics. Creating this tool will aid time-critical scheduling by increasing planning efficiency, clarifying the value of alternative modalities uniquely provided by multi-sensor systems, and by presenting both sets of organized information to operators. Such a tool will help operators more quickly and fully utilize sensing systems, a high interest objective within the current remote sensing operations community. Preliminary results for mixed-integer programming formulations of a sensor scheduling problem will be presented. Assumptions regarding sensor geometry

  14. Optimal radiotherapy dose schedules under parametric uncertainty

    NASA Astrophysics Data System (ADS)

    Badri, Hamidreza; Watanabe, Yoichi; Leder, Kevin

    2016-01-01

    We consider the effects of parameter uncertainty on the optimal radiation schedule in the context of the linear-quadratic model. Our interest arises from the observation that if inter-patient variability in normal and tumor tissue radiosensitivity or sparing factor of the organs-at-risk (OAR) are not accounted for during radiation scheduling, the performance of the therapy may be strongly degraded or the OAR may receive a substantially larger dose than the allowable threshold. This paper proposes a stochastic radiation scheduling concept to incorporate inter-patient variability into the scheduling optimization problem. Our method is based on a probabilistic approach, where the model parameters are given by a set of random variables. Our probabilistic formulation ensures that our constraints are satisfied with a given probability, and that our objective function achieves a desired level with a stated probability. We used a variable transformation to reduce the resulting optimization problem to two dimensions. We showed that the optimal solution lies on the boundary of the feasible region and we implemented a branch and bound algorithm to find the global optimal solution. We demonstrated how the configuration of optimal schedules in the presence of uncertainty compares to optimal schedules in the absence of uncertainty (conventional schedule). We observed that in order to protect against the possibility of the model parameters falling into a region where the conventional schedule is no longer feasible, it is required to avoid extremal solutions, i.e. a single large dose or very large total dose delivered over a long period. Finally, we performed numerical experiments in the setting of head and neck tumors including several normal tissues to reveal the effect of parameter uncertainty on optimal schedules and to evaluate the sensitivity of the solutions to the choice of key model parameters.

  15. Gang scheduling a parallel machine. Revision 1

    SciTech Connect

    Gorda, B.C.; Brooks, E.D. III

    1991-12-01

    Program development on parallel machines can be a nightmare of scheduling headaches. We have developed a portable time sharing mechanism to handle the problem of scheduling gangs of processes. User programs and their gangs of processes are put to sleep and awakened by the gang scheduler to provide a time sharing environment. Time quantum are adjusted according to priority queues and a system of fair share accounting. The initial platform for this software is the 128 processor BBN TC2000 in use in the Massively Parallel Computing Initiative at the Lawrence Livermore National Laboratory.

  16. A unified model for scheduling elective admissions.

    PubMed Central

    Barber, R W

    1977-01-01

    A model is presented that deals with two problems not previously solved: it handles the random arrival of requests for admission and permits continuous updating of scheduling decisions in a dynamic process, and it provides global long-term optimization of patient census rather than a series of suboptimal short-term solutions. The model can be used either for continuous dynamic scheduling or for periodic static scheduling. It is usable with many different system objectives and levels of computer resources, although an on-line computer is needed for its most effective use in the dynamic mode. PMID:591351

  17. SRG - SCHEDULE REPORT GENERATOR COMPUTER PROGRAM

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer, SO (COSMIC Program MSC-21525), Schedule Tracker, ST (COSMIC Program MSC-21526), and Schedule Report Generator, SRG, are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Tracker provides an effective method for tracking tasks that are 'past due' and/or 'near term'. ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are schedule for recent completion (near term). Schedule Reports Generator provides a simple method for generating periodic schedule reports. SRG enables an engineering manager to monitor tasks assigned to staff members on a weekly basis. SRG sorts three types of reports using one or more data fields as sort keys. One type is sorted using the calendar year as the primary key and the end date as the secondary key. Another type is sorted by flight number. A third type of report, Waterfall plots, is also generated by SRG using the end date as the sorting key. SRG requires as input a single file or two concatenated files with up to 400 single line entries. The user constructs the input file by using the LSE editor VAX utility prior to the execution of the program. The user is able to modify the current functional description text lines just displayed. ST and SRG use the same data base file as input. The common data base file has a maximum number of 400 entries. The time span of all three programs is nineteen months. Both of these maximum

  18. SRG - SCHEDULE REPORT GENERATOR COMPUTER PROGRAM

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer, SO (COSMIC Program MSC-21525), Schedule Tracker, ST (COSMIC Program MSC-21526), and Schedule Report Generator, SRG, are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Tracker provides an effective method for tracking tasks that are 'past due' and/or 'near term'. ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are schedule for recent completion (near term). Schedule Reports Generator provides a simple method for generating periodic schedule reports. SRG enables an engineering manager to monitor tasks assigned to staff members on a weekly basis. SRG sorts three types of reports using one or more data fields as sort keys. One type is sorted using the calendar year as the primary key and the end date as the secondary key. Another type is sorted by flight number. A third type of report, Waterfall plots, is also generated by SRG using the end date as the sorting key. SRG requires as input a single file or two concatenated files with up to 400 single line entries. The user constructs the input file by using the LSE editor VAX utility prior to the execution of the program. The user is able to modify the current functional description text lines just displayed. ST and SRG use the same data base file as input. The common data base file has a maximum number of 400 entries. The time span of all three programs is nineteen months. Both of these maximum

  19. A Framework for Scheduling Professional Sports Leagues

    NASA Astrophysics Data System (ADS)

    Nurmi, Kimmo; Goossens, Dries; Bartsch, Thomas; Bonomo, Flavia; Briskorn, Dirk; Duran, Guillermo; Kyngäs, Jari; Marenco, Javier; Ribeiro, Celso C.; Spieksma, Frits; Urrutia, Sebastián; Wolf-Yadlin, Rodrigo

    2010-10-01

    This paper introduces a framework for a highly constrained sports scheduling problem which is modeled from the requirements of various professional sports leagues. We define a sports scheduling problem, introduce the necessary terminology and detail the constraints of the problem. A set of artificial and real-world instances derived from the actual problems solved for the professional sports league owners are proposed. We publish the best solutions we have found, and invite the sports scheduling community to find solutions to the unsolved instances. We believe that the instances will help researchers to test the value of their solution methods. The instances are available online.

  20. A Flexible Nurse Scheduling Support System

    PubMed Central

    Ozkarahan, Irem

    1987-01-01

    Scheduling nursing personnel in hospitals is very complex because of the variety of conflicting interests and objectives. Also, demand varies 24-hour a day 7-day a week, is skill specific and hard to forecast. In the face of this complexity, the present nurse scheduling models have met with little success. In this paper, we propose a more flexible decision support system that will satisfy the interests of both hospitals and nurses through alternative models that attempt to accommodate flexible work patterns as it integrates time of the day (TOD) and day of the week (DOW) scheduling problems.

  1. Operator scheduling at the Advanced Light Source

    SciTech Connect

    Miller, B.

    1998-06-01

    Scheduling Operations staff at the Advanced Light Source (ALS) has evolved from 5 shifts/week for commissioning operations in 1992 to the present 24 hour/day, 21 shift coverage as the ALS went to full operation for users. A number of schedules were developed and implemented in an effort to accommodate changing ALS shift coverage requirements. The present work schedule and the lessons learned, address a number of issues that are useful to any facility that is operating 24 hours/day, 7 days/week.

  2. Bridging the Gap Between Planning and Scheduling

    NASA Technical Reports Server (NTRS)

    Smith, David E.; Frank, Jeremy; Jonsson, Ari K.; Norvig, Peter (Technical Monitor)

    2000-01-01

    Planning research in Artificial Intelligence (AI) has often focused on problems where there are cascading levels of action choice and complex interactions between actions. In contrast. Scheduling research has focused on much larger problems where there is little action choice, but the resulting ordering problem is hard. In this paper, we give an overview of M planning and scheduling techniques, focusing on their similarities, differences, and limitations. We also argue that many difficult practical problems lie somewhere between planning and scheduling, and that neither area has the right set of tools for solving these vexing problems.

  3. Compiling Planning into Scheduling: A Sketch

    NASA Technical Reports Server (NTRS)

    Bedrax-Weiss, Tania; Crawford, James M.; Smith, David E.

    2004-01-01

    Although there are many approaches for compiling a planning problem into a static CSP or a scheduling problem, current approaches essentially preserve the structure of the planning problem in the encoding. In this pape: we present a fundamentally different encoding that more accurately resembles a scheduling problem. We sketch the approach and argue, based on an example, that it is possible to automate the generation of such an encoding for problems with certain properties and thus produce a compiler of planning into scheduling problems. Furthermore we argue that many NASA problems exhibit these properties and that such a compiler would provide benefits to both theory and practice.

  4. Space communications scheduler: A rule-based approach to adaptive deadline scheduling

    NASA Technical Reports Server (NTRS)

    Straguzzi, Nicholas

    1990-01-01

    Job scheduling is a deceptively complex subfield of computer science. The highly combinatorial nature of the problem, which is NP-complete in nearly all cases, requires a scheduling program to intelligently transverse an immense search tree to create the best possible schedule in a minimal amount of time. In addition, the program must continually make adjustments to the initial schedule when faced with last-minute user requests, cancellations, unexpected device failures, quests, cancellations, unexpected device failures, etc. A good scheduler must be quick, flexible, and efficient, even at the expense of generating slightly less-than-optimal schedules. The Space Communication Scheduler (SCS) is an intelligent rule-based scheduling system. SCS is an adaptive deadline scheduler which allocates modular communications resources to meet an ordered set of user-specified job requests on board the NASA Space Station. SCS uses pattern matching techniques to detect potential conflicts through algorithmic and heuristic means. As a result, the system generates and maintains high density schedules without relying heavily on backtracking or blind search techniques. SCS is suitable for many common real-world applications.

  5. 29 CFR 1952.173 - Developmental schedule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... radiation machines and other non-Atomic Energy Act sources of radiation. The standards and enforcement... Inspection Scheduling System will be fully implemented and in operation March 31, 1975....

  6. Monitoring Building Systems for Schedule Compliance

    SciTech Connect

    Jensen, Andrew M.; Belew, Shan T.

    2013-02-19

    As Pacific Northwest National Laboratory (PNNL) initiated a Core Business Hours program, it became a challenge to ensure that the hundreds of systems campus wide were operating within their programmed schedules. Therefore, a collaborative exchange between PNNL operations and PNNL researchers developing the Decision Support for Operations and Maintenance (DSOM) software package was initiated to create a tool to solve this problem. This new DSOM tool verifies systems are operating within scheduled operation times by polling Building Automation and Control Network (BACnet) identifiers of systems’ on/off or command statuses. The tool records the time spent in operation state (ON) and totalizes each system over a rolling 7-day period, highlighting systems that are running over the scheduled hours. This snapshot view allows building management to look quickly at the entire campus to ensure that systems are not operating beyond their scheduled hours.

  7. Knowledge-based scheduling of arrival aircraft

    NASA Technical Reports Server (NTRS)

    Krzeczowski, K.; Davis, T.; Erzberger, H.; Lev-Ram, I.; Bergh, C.

    1995-01-01

    A knowledge-based method for scheduling arrival aircraft in the terminal area has been implemented and tested in real-time simulation. The scheduling system automatically sequences, assigns landing times, and assigns runways to arrival aircraft by utilizing continuous updates of aircraft radar data and controller inputs. The scheduling algorithms is driven by a knowledge base which was obtained in over two thousand hours of controller-in-the-loop real-time simulation. The knowledge base contains a series of hierarchical 'rules' and decision logic that examines both performance criteria, such as delay reduction, as well as workload reduction criteria, such as conflict avoidance. The objective of the algorithms is to devise an efficient plan to land the aircraft in a manner acceptable to the air traffic controllers. This paper will describe the scheduling algorithms, give examples of their use, and present data regarding their potential benefits to the air traffic system.

  8. Hanford Site Environmental Surveillance Master Sampling Schedule

    SciTech Connect

    Bisping, Lynn E.

    2000-01-27

    This document contains the CY2000 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed.

  9. The School Schedule--Servant or Mistress?

    ERIC Educational Resources Information Center

    Holmes, Mark

    1984-01-01

    Pointing out that time is a dimension of school wealth, the author explores its use in school schedules. Administrators need to be aware of the relationship between time allocation and learning consequences. (MD)

  10. Job Scheduling in a Heterogeneous Grid Environment

    NASA Technical Reports Server (NTRS)

    Shan, Hong-Zhang; Smith, Warren; Oliker, Leonid; Biswas, Rupak

    2004-01-01

    Computational grids have the potential for solving large-scale scientific problems using heterogeneous and geographically distributed resources. However, a number of major technical hurdles must be overcome before this potential can be realized. One problem that is critical to effective utilization of computational grids is the efficient scheduling of jobs. This work addresses this problem by describing and evaluating a grid scheduling architecture and three job migration algorithms. The architecture is scalable and does not assume control of local site resources. The job migration policies use the availability and performance of computer systems, the network bandwidth available between systems, and the volume of input and output data associated with each job. An extensive performance comparison is presented using real workloads from leading computational centers. The results, based on several key metrics, demonstrate that the performance of our distributed migration algorithms is significantly greater than that of a local scheduling framework and comparable to a non-scalable global scheduling approach.

  11. 40 CFR 52.778 - Compliance schedules.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... requirements of subpart N of this chapter. All regulations cited are air pollution control regulations of the State, unless otherwise noted. Source Location Regulation involved Date schedule adopted lake county...

  12. 40 CFR 52.778 - Compliance schedules.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... requirements of subpart N of this chapter. All regulations cited are air pollution control regulations of the State, unless otherwise noted. Source Location Regulation involved Date schedule adopted lake county...

  13. 40 CFR 52.778 - Compliance schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements of subpart N of this chapter. All regulations cited are air pollution control regulations of the State, unless otherwise noted. Source Location Regulation involved Date schedule adopted lake county...

  14. 40 CFR 52.778 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... requirements of subpart N of this chapter. All regulations cited are air pollution control regulations of the State, unless otherwise noted. Source Location Regulation involved Date schedule adopted lake county...

  15. 40 CFR 52.778 - Compliance schedules.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... requirements of subpart N of this chapter. All regulations cited are air pollution control regulations of the State, unless otherwise noted. Source Location Regulation involved Date schedule adopted lake county...

  16. 29 CFR 1952.211 - Developmental schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... schedule. (a) Occupational health study accepted and implementation begun July, 1973; (b) Compliance Manual... occupational health program, July, 1975; (m) Fully implemented public employees program, December, 1975; ...

  17. 40 CFR 141.702 - Sampling schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 141.702 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Enhanced Treatment for Cryptosporidium Source Water Monitoring Requirements § 141.702 Sampling schedules. (a) Systems required to conduct source water...

  18. 40 CFR 141.702 - Sampling schedules.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 141.702 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Enhanced Treatment for Cryptosporidium Source Water Monitoring Requirements § 141.702 Sampling schedules. (a) Systems required to conduct source water monitoring...

  19. 40 CFR 141.702 - Sampling schedules.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 141.702 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Enhanced Treatment for Cryptosporidium Source Water Monitoring Requirements § 141.702 Sampling schedules. (a) Systems required to conduct source water monitoring...

  20. 40 CFR 141.702 - Sampling schedules.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 141.702 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Enhanced Treatment for Cryptosporidium Source Water Monitoring Requirements § 141.702 Sampling schedules. (a) Systems required to conduct source water monitoring...

  1. 40 CFR 141.702 - Sampling schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 141.702 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Enhanced Treatment for Cryptosporidium Source Water Monitoring Requirements § 141.702 Sampling schedules. (a) Systems required to conduct source water monitoring...

  2. 29 CFR 1952.273 - Developmental schedule.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Vermont § 1952.273 Developmental schedule. (a) Introduction and enactment of amendments to the Vermont Occupational Safety and Health Act in the...

  3. 29 CFR 1952.273 - Developmental schedule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Vermont § 1952.273 Developmental schedule. (a) Introduction and enactment of amendments to the Vermont Occupational Safety and Health Act in the...

  4. 29 CFR 1952.273 - Developmental schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Vermont § 1952.273 Developmental schedule. (a) Introduction and enactment of amendments to the Vermont Occupational Safety and Health Act in the...

  5. 29 CFR 1952.273 - Developmental schedule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Vermont § 1952.273 Developmental schedule. (a) Introduction and enactment of amendments to the Vermont Occupational Safety and Health Act in the...

  6. 29 CFR 1952.273 - Developmental schedule.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Vermont § 1952.273 Developmental schedule. (a) Introduction and enactment of amendments to the Vermont Occupational Safety and Health Act in the...

  7. Effect of Uncertainty on Deterministic Runway Scheduling

    NASA Technical Reports Server (NTRS)

    Gupta, Gautam; Malik, Waqar; Jung, Yoon C.

    2012-01-01

    Active runway scheduling involves scheduling departures for takeoffs and arrivals for runway crossing subject to numerous constraints. This paper evaluates the effect of uncertainty on a deterministic runway scheduler. The evaluation is done against a first-come- first-serve scheme. In particular, the sequence from a deterministic scheduler is frozen and the times adjusted to satisfy all separation criteria; this approach is tested against FCFS. The comparison is done for both system performance (throughput and system delay) and predictability, and varying levels of congestion are considered. The modeling of uncertainty is done in two ways: as equal uncertainty in availability at the runway as for all aircraft, and as increasing uncertainty for later aircraft. Results indicate that the deterministic approach consistently performs better than first-come-first-serve in both system performance and predictability.

  8. 29 CFR 1952.291 - Developmental schedule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Nevada § 1952.291 Developmental schedule... the program—July 1, 1975. (d) Proposed amendments to the Nevada Occupational Safety and Health Act to...

  9. Firefighter Shift Schedules Affect Sleep Quality.

    PubMed

    Billings, Joel; Focht, Will

    2016-03-01

    The aim of this study was to investigate the prevalence and severity of firefighter sleep quality across department shift schedules. Sleep quality was assessed using a Pittsburgh Sleep Quality Index in a sample of 109 male career firefighters from six fire departments in three Southwestern US states. The three shift schedules studied were 24on/48off, 48on/96off, and Kelly. Seventy-three percent of firefighters report poor sleep quality. The 24on/48off shift schedule is associated with the best sleep quality and Kelly is associated with the worst sleep quality. Firefighters working second jobs report significantly poorer sleep quality than those who do not. Shift schedules that disrupt normal circadian rhythms more result in poorer sleep quality, which can lead to less effective emergency response and increased risk to firefighter health and safety.

  10. Alternative Work Schedules Increase Employee Satisfaction.

    ERIC Educational Resources Information Center

    Turney, John R.; Cohen, Stanley L.

    1983-01-01

    Facets of alternative work schedules (AWS) are discussed: importance of employee control, possible negative consequences, AWS handbook, time monitoring systems, and treatment of exceptions. AWS' effect on productivity and motivation is examined. (SK)

  11. The Composition of the Master Schedule

    NASA Technical Reports Server (NTRS)

    Thomas, Cynthia C.; Behrend, Dirk; MacMillan, Daniel S.

    2010-01-01

    Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.

  12. Scheduling job shop - A case study

    NASA Astrophysics Data System (ADS)

    Abas, M.; Abbas, A.; Khan, W. A.

    2016-08-01

    The scheduling in job shop is important for efficient utilization of machines in the manufacturing industry. There are number of algorithms available for scheduling of jobs which depend on machines tools, indirect consumables and jobs which are to be processed. In this paper a case study is presented for scheduling of jobs when parts are treated on available machines. Through time and motion study setup time and operation time are measured as total processing time for variety of products having different manufacturing processes. Based on due dates different level of priority are assigned to the jobs and the jobs are scheduled on the basis of priority. In view of the measured processing time, the times for processing of some new jobs are estimated and for efficient utilization of the machines available an algorithm is proposed and validated.

  13. Job scheduling in a heterogenous grid environment

    SciTech Connect

    Oliker, Leonid; Biswas, Rupak; Shan, Hongzhang; Smith, Warren

    2004-02-11

    Computational grids have the potential for solving large-scale scientific problems using heterogeneous and geographically distributed resources. However, a number of major technical hurdles must be overcome before this potential can be realized. One problem that is critical to effective utilization of computational grids is the efficient scheduling of jobs. This work addresses this problem by describing and evaluating a grid scheduling architecture and three job migration algorithms. The architecture is scalable and does not assume control of local site resources. The job migration policies use the availability and performance of computer systems, the network bandwidth available between systems, and the volume of input and output data associated with each job. An extensive performance comparison is presented using real workloads from leading computational centers. The results, based on several key metrics, demonstrate that the performance of our distributed migration algorithms is significantly greater than that of a local scheduling framework and comparable to a non-scalable global scheduling approach.

  14. Intelligent perturbation algorithms for space scheduling optimization

    NASA Technical Reports Server (NTRS)

    Kurtzman, Clifford R.

    1990-01-01

    The optimization of space operations is examined in the light of optimization heuristics for computer algorithms and iterative search techniques. Specific attention is given to the search concepts known collectively as intelligent perturbation algorithms (IPAs) and their application to crew/resource allocation problems. IPAs iteratively examine successive schedules which become progressively more efficient, and the characteristics of good perturbation operators are listed. IPAs can be applied to aerospace systems to efficiently utilize crews, payloads, and resources in the context of systems such as Space-Station scheduling. A program is presented called the MFIVE Space Station Scheduling Worksheet which generates task assignments and resource usage structures. The IPAs can be used to develop flexible manifesting and scheduling for the Industrial Space Facility.

  15. Learning to improve iterative repair scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte; Davis, Eugene

    1992-01-01

    This paper presents a general learning method for dynamically selecting between repair heuristics in an iterative repair scheduling system. The system employs a version of explanation-based learning called Plausible Explanation-Based Learning (PEBL) that uses multiple examples to confirm conjectured explanations. The basic approach is to conjecture contradictions between a heuristic and statistics that measure the quality of the heuristic. When these contradictions are confirmed, a different heuristic is selected. To motivate the utility of this approach we present an empirical evaluation of the performance of a scheduling system with respect to two different repair strategies. We show that the scheduler that learns to choose between the heuristics outperforms the same scheduler with any one of two heuristics alone.

  16. Alternative dosage schedules with HPV VLP vaccines

    PubMed Central

    Stanley, Margaret A.; Sudenga, Staci L.; Giuliano, Anna R.

    2014-01-01

    Summary Human papillomavirus (HPV) vaccines can prevent multiple cancers in women and men. Difficulties in the cost and completion of the three-dose vaccine series have led to considerations of alternative dose schedules. In clinical trials, three doses given within a 12-month period versus the standard six-month period yielded comparable results, and immunogenicity appears comparable with two doses in adolescent females compared to the three-dose series in adult females. While the data are generally supportive of moving to a two-dose vaccine schedule among young female adolescents, the adoption of a two-dose vaccine schedule still poses a potential risk to the strength and longevity of the immune response. Public health authorities implementing a two-dose vaccine schedule should devise risk management strategies to minimize the potential impact on cancer prevention. PMID:25001893

  17. 76 FR 57683 - Regulatory Review Schedule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... scheduled for November 14-15, 2011 at the Spa Resort Casino, Palms Springs, California to November 14, 2011... Consultation-- Spa Resort Casino, Palm 5 California. Springs, CA. New date and location: Consultation...

  18. 29 CFR 1952.291 - Developmental schedule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Nevada § 1952.291 Developmental schedule... the program—July 1, 1975. (d) Proposed amendments to the Nevada Occupational Safety and Health Act...

  19. Analysis of gain scheduled control for nonlinear plants

    NASA Technical Reports Server (NTRS)

    Shamma, Jeff S.; Athans, Michael

    1990-01-01

    Gain scheduling has proven to be a successful design methodology in many engineering applications. In the absence of a sound theoretical analysis, these designs come with no guarantees of the robustness, performance, or even nominal stability of the overall gain-scheduled design. An analysis is presented for two types of nonlinear gain-scheduled control systems: (1) scheduling on a reference trajectory and (2) scheduling on the plant output. Conditions which guarantee stability, robustness, and performance properties of the global gain schedule designs are given. These conditions confirm and formalize popular notions regarding gain-scheduled designs, such as that the scheduling variable should vary slowly and capture the plant's nonlinearities.

  20. Request Generation 2 mission planning and scheduling

    NASA Technical Reports Server (NTRS)

    Greenhut, Darlene D.

    1991-01-01

    Request Generation II (ReGe II) is a PC-based prototype knowledge based system intented to assist USAF personnel in planning and scheduling satellite operations for their Mission Control Complexes (MCC). It aids MCC personnel in producing weekly Program Action Plans (PAPs) for each of the satellite vehicles an MCC is responsible for monitoring and maintaining. The PAPs are input to the Resource Control Complex (RCC) which schedules all satellite support requests for usage of the network.

  1. Advanced Reactors Transition Program Resource Loaded Schedule

    SciTech Connect

    BOWEN, W.W.

    1999-11-08

    The Advanced Reactors Transition (ART) Resource Loaded Schedule (RLS) provides a cost and schedule baseline for managing the project elements within the ART Program. The Fast Flux Test Facility (FFTF) activities are delineated through the end of FY 2000, assuming continued standby. The Nuclear Energy (NE) Legacies and Plutonium Recycle Test Reactor (PRTR) activities are delineated through the end of the deactivation process. This document reflects the 1 Oct 1999 baseline.

  2. Optimal factory scheduling using stochastic dominance A

    SciTech Connect

    Wurman, P.R.

    1996-12-31

    Generating optimal production schedules for manufacturing facilities an area of great theoretical and practical importance. During the last decade, an effort has been made to reconcile the techniques developed by the AI and OR communities. The work described here aims to continue in this vein by showing how a class of well-defined stochastic scheduling problems can be mapped into a general search procedure. This approach improves upon other methods by handling the general case of multidimensional stochastic costs.

  3. Advanced Reactors Transition Program Resource Loaded Schedule

    SciTech Connect

    GANTT, D.A.

    2000-01-12

    The Advanced Reactors Transition (ART) Resource Loaded Schedule (RLS) provides a cost and schedule baseline for managing the project elements within the ART Program. The Fast Flux Test Facility (FETF) activities are delineated through the end of FY 2000, assuming continued standby. The Nuclear Energy (NE) Legacies and Plutonium Recycle Test Reactor (PRTR) activities are delineated through the end of the deactivation process. This revision reflects the 19 Oct 1999 baseline.

  4. Nonlinear neural network for deterministic scheduling

    SciTech Connect

    Gulati, S.; Iyengar, S.S.; Toomarian, N.; Protopopescu, V.; Barhen, J.

    1988-01-01

    This paper addresses the NP-complete, deterministic scheduling problem for a single server system. Given a set of n tasks along with the precedence-constraints among them, their timing requirements, setup costs and their completion deadlines, a neuromorphic model is used to construct a non-preemptive optimal processing schedule such that the total completion time, total tarediness and the number of tardy jobs is minimized. This model exhibits faster convergence than techniques based on gradient projection methods.

  5. Scheduling the future NASA Space Network: Experiences with a flexible scheduling prototype

    NASA Technical Reports Server (NTRS)

    Happell, Nadine; Moe, Karen L.; Minnix, Jay

    1993-01-01

    NASA's Space Network (SN) provides telecommunications and tracking services to low earth orbiting spacecraft. One proposal for improving resource allocation and automating conflict resolution for the SN is the concept of flexible scheduling. In this concept, each Payload Operations Control Center (POCC) will possess a Space Network User POCC Interface (SNUPI) to support the development and management of flexible requests. Flexible requests express the flexibility, constraints, and repetitious nature of the user's communications requirements. Flexible scheduling is expected to improve SN resource utilization and user satisfaction, as well as reduce the effort to produce and maintain a schedule. A prototype testbed has been developed to better understand flexible scheduling as it applies to the SN. This testbed consists of a SNUPI workstation, an SN scheduler, and a flexible request language that conveys information between the two systems. All three are being evaluated by operations personnel. Benchmark testing is being conducted on the scheduler to quantify the productivity improvements achieved with flexible requests.

  6. Critical Machine Based Scheduling -A Review

    NASA Astrophysics Data System (ADS)

    Vivek, P.; Saravanan, R.; Chandrasekaran, M.; Pugazhenthi, R.

    2017-03-01

    This article aims to identify the natural occurrence of the critical machines in scheduling. The exciting scheduling in the real time manufacturing environment is focused on considering equal weight-age of all the machines, but very few researchers were considered the real time constraint(s) like processor/ machine/ workstation availability, etc.,. This article explores the gap between the theory and practices by identifying the critical machine in scheduling and helps the researcher to find the suitable problem in their case study environment. Through the literature survey, it is evident that, in scheduling the occurrence of the critical machine is in nature. The critical machine is found in various names and gives a various range of weight-age based on the particular manufacturing environment and it plays a vital role in scheduling which includes one or more circumstances of occurrence in the production environment. Very few researchers were reported that in manufacturing environment, the critical machine occurrence is in nature, but most of the researchers were focused to optimize the manufacturing environment by only reducing the cycle time. In real-time manufacturing environment, the scheduling of critical machine(s) was keenly monitored and some weight-age was considered.

  7. Force dynamics in fixed-ratio schedules.

    PubMed

    Pinkston, Jonathan W; McBee, Lindsey N

    2014-03-01

    Fixed-ratio schedules are widely used in behavioral research. Although fixed-ratio schedules often conjure up relationships to work and effort, little is known about effort-related measures in these schedules. Early research had shown that force and effort of operant behavior vary systematically during the execution of ratio schedules, and the goal of the present study was to revisit early research on force dynamics in fixed-ratio schedules. Four rats earned sucrose by pressing an isometric force transducer. Presses produced sucrose after ten or twenty responses. In general, the force of responses increased then decreased systematically across the ratio. The possibility that decreases in force during ratio execution was due to a trade-off with the differential reinforcement of short inter-response times (IRT) was investigated in an additional condition where sucrose was made available according to a tandem fixed-ratio 19 inter-response (IRT)> t schedule. The tandem IRT requirement did not eliminate decreasing trends in force across the ratio; unexpectedly, the tandem requirement did eliminate increases in force early in the ratio, which may reflect sequence-level organization operating in the control of force dynamics.

  8. Stochastic Modeling of Airlines' Scheduled Services Revenue

    NASA Technical Reports Server (NTRS)

    Hamed, M. M.

    1999-01-01

    Airlines' revenue generated from scheduled services account for the major share in the total revenue. As such, predicting airlines' total scheduled services revenue is of great importance both to the governments (in case of national airlines) and private airlines. This importance stems from the need to formulate future airline strategic management policies, determine government subsidy levels, and formulate governmental air transportation policies. The prediction of the airlines' total scheduled services revenue is dealt with in this paper. Four key components of airline's scheduled services are considered. These include revenues generated from passenger, cargo, mail, and excess baggage. By addressing the revenue generated from each schedule service separately, air transportation planners and designers arc able to enhance their ability to formulate specific strategies for each component. Estimation results clearly indicate that the four stochastic processes (scheduled services components) are represented by different Box-Jenkins ARIMA models. The results demonstrate the appropriateness of the developed models and their ability to provide air transportation planners with future information vital to the planning and design processes.

  9. Stochastic Modeling of Airlines' Scheduled Services Revenue

    NASA Technical Reports Server (NTRS)

    Hamed, M. M.

    1999-01-01

    Airlines' revenue generated from scheduled services account for the major share in the total revenue. As such, predicting airlines' total scheduled services revenue is of great importance both to the governments (in case of national airlines) and private airlines. This importance stems from the need to formulate future airline strategic management policies, determine government subsidy levels, and formulate governmental air transportation policies. The prediction of the airlines' total scheduled services revenue is dealt with in this paper. Four key components of airline's scheduled services are considered. These include revenues generated from passenger, cargo, mail, and excess baggage. By addressing the revenue generated from each schedule service separately, air transportation planners and designers are able to enhance their ability to formulate specific strategies for each component. Estimation results clearly indicate that the four stochastic processes (scheduled services components) are represented by different Box-Jenkins ARIMA models. The results demonstrate the appropriateness of the developed models and their ability to provide air transportation planners with future information vital to the planning and design processes.

  10. Optimal Schedules in Multitask Motor Learning.

    PubMed

    Lee, Jeong Yoon; Oh, Youngmin; Kim, Sung Shin; Scheidt, Robert A; Schweighofer, Nicolas

    2016-04-01

    Although scheduling multiple tasks in motor learning to maximize long-term retention of performance is of great practical importance in sports training and motor rehabilitation after brain injury, it is unclear how to do so. We propose here a novel theoretical approach that uses optimal control theory and computational models of motor adaptation to determine schedules that maximize long-term retention predictively. Using Pontryagin's maximum principle, we derived a control law that determines the trial-by-trial task choice that maximizes overall delayed retention for all tasks, as predicted by the state-space model. Simulations of a single session of adaptation with two tasks show that when task interference is high, there exists a threshold in relative task difficulty below which the alternating schedule is optimal. Only for large differences in task difficulties do optimal schedules assign more trials to the harder task. However, over the parameter range tested, alternating schedules yield long-term retention performance that is only slightly inferior to performance given by the true optimal schedules. Our results thus predict that in a large number of learning situations wherein tasks interfere, intermixing tasks with an equal number of trials is an effective strategy in enhancing long-term retention.

  11. Stochastic Modeling of Airlines' Scheduled Services Revenue

    NASA Technical Reports Server (NTRS)

    Hamed, M. M.

    1999-01-01

    Airlines' revenue generated from scheduled services account for the major share in the total revenue. As such, predicting airlines' total scheduled services revenue is of great importance both to the governments (in case of national airlines) and private airlines. This importance stems from the need to formulate future airline strategic management policies, determine government subsidy levels, and formulate governmental air transportation policies. The prediction of the airlines' total scheduled services revenue is dealt with in this paper. Four key components of airline's scheduled services are considered. These include revenues generated from passenger, cargo, mail, and excess baggage. By addressing the revenue generated from each schedule service separately, air transportation planners and designers arc able to enhance their ability to formulate specific strategies for each component. Estimation results clearly indicate that the four stochastic processes (scheduled services components) are represented by different Box-Jenkins ARIMA models. The results demonstrate the appropriateness of the developed models and their ability to provide air transportation planners with future information vital to the planning and design processes.

  12. Prescribed Travel Schedules for Fatigue Management

    NASA Technical Reports Server (NTRS)

    Whitmire, Alexandra; Johnston, Smith; Lockley, Steven

    2011-01-01

    The NASA Fatigue Management Team is developing recommendations for managing fatigue during travel and for shift work operations, as Clinical Practice Guidelines for the Management of Circadian Desynchrony in ISS Operations. The Guidelines provide the International Space Station (ISS ) flight surgeons and other operational clinicians with evidence-based recommendations for mitigating fatigue and other factors related to sleep loss and circadian desynchronization. As much international travel is involved both before and after flight, the guidelines provide recommendations for: pre-flight training, in-flight operations, and post-flight rehabilitation. The objective of is to standardize the process by which care is provided to crewmembers, ground controllers, and other support personnel such as trainers, when overseas travel or schedule shifting is required. Proper scheduling of countermeasures - light, darkness, melatonin, diet, exercise, and medications - is the cornerstone for facilitating circadian adaptation, improving sleep, enhancing alertness, and optimizing performance. The Guidelines provide, among other things, prescribed travel schedules that outline the specific implementation of these mitigation strategies. Each travel schedule offers evidence based protocols for properly using the NASA identified countermeasures for fatigue. This presentation will describe the travel implementation schedules and how these can be used to alleviate the effects of jet lag and/or schedule shifts.

  13. Interactive Dynamic Mission Scheduling for ASCA

    NASA Astrophysics Data System (ADS)

    Antunes, A.; Nagase, F.; Isobe, T.

    The Japanese X-ray astronomy satellite ASCA (Advanced Satellite for Cosmology and Astrophysics) mission requires scheduling for each 6-month observation phase, further broken down into weekly schedules at a few minutes resolution. Two tools, SPIKE and NEEDLE, written in Lisp and C, use artificial intelligence (AI) techniques combined with a graphic user interface for fast creation and alteration of mission schedules. These programs consider viewing and satellite attitude constraints as well as observer-requested criteria and present an optimized set of solutions for review by the planner. Six-month schedules at 1 day resolution are created for an oversubscribed set of targets by the SPIKE software, originally written for HST and presently being adapted for EUVE, XTE and AXAF. The NEEDLE code creates weekly schedules at 1 min resolution using in-house orbital routines and creates output for processing by the command generation software. Schedule creation on both the long- and short-term scale is rapid, less than 1 day for long-term, and one hour for short-term.

  14. Scheduling periodic jobs using imprecise results

    NASA Technical Reports Server (NTRS)

    Chung, Jen-Yao; Liu, Jane W. S.; Lin, Kwei-Jay

    1987-01-01

    One approach to avoid timing faults in hard, real-time systems is to make available intermediate, imprecise results produced by real-time processes. When a result of the desired quality cannot be produced in time, an imprecise result of acceptable quality produced before the deadline can be used. The problem of scheduling periodic jobs to meet deadlines on a system that provides the necessary programming language primitives and run-time support for processes to return imprecise results is discussed. Since the scheduler may choose to terminate a task before it is completed, causing it to produce an acceptable but imprecise result, the amount of processor time assigned to any task in a valid schedule can be less than the amount of time required to complete the task. A meaningful formulation of the scheduling problem must take into account the overall quality of the results. Depending on the different types of undesirable effects caused by errors, jobs are classified as type N or type C. For type N jobs, the effects of errors in results produced in different periods are not cumulative. A reasonable performance measure is the average error over all jobs. Three heuristic algorithms that lead to feasible schedules with small average errors are described. For type C jobs, the undesirable effects of errors produced in different periods are cumulative. Schedulability criteria of type C jobs are discussed.

  15. Enabling a New Planning and Scheduling Paradigm

    NASA Technical Reports Server (NTRS)

    Jaap, John; Davis, Elizabeth

    2004-01-01

    The Flight Projects Directorate at NASA's Marshall Space Flight Center is developing a new planning and scheduling environment and a new scheduling algorithm to enable a paradigm shift in planning and scheduling concepts. Over the past 33 years Marshall has developed and evolved a paradigm for generating payload timelines for Skylab, Spacelab, various other Shuttle payloads, and the International Space Station. The current paradigm starts by collecting the requirements, called "tasks models," from the scientists and technologists for the tasks that they want to be done. Because of shortcomings in the current modeling schema, some requirements are entered as notes. Next a cadre with knowledge of vehicle and hardware modifies these models to encompass and be compatible with the hardware model; again, notes are added when the modeling schema does not provide a better way to represent the requirements. Finally, another cadre further modifies the models to be compatible with the scheduling engine. This last cadre also submits the models to the scheduling engine or builds the timeline manually to accommodate requirements that are expressed in notes. A future paradigm would provide a scheduling engine that accepts separate science models and hardware models. The modeling schema would have the capability to represent all the requirements without resorting to notes. Furthermore, the scheduling engine would not require that the models be modified to account for the capabilities (limitations) of the scheduling engine. The enabling technology under development at Marshall has three major components. (1) A new modeling schema allows expressing all the requirements of the tasks without resorting to notes or awkward contrivances. The chosen modeling schema is both maximally expressive and easy to use. It utilizes graphics methods to show hierarchies of task constraints and networks of temporal relationships. (2) A new scheduling algorithm automatically schedules the models

  16. Enabling a New Planning and Scheduling Paradigm

    NASA Technical Reports Server (NTRS)

    Jaap, John; Davis, Elizabeth

    2004-01-01

    The Flight Projects Directorate at NASA's Marshall Space Flight Center is developing a new planning and scheduling environment and a new scheduling algorithm to enable a paradigm shift in planning and scheduling concepts. Over the past 33 years Marshall has developed and evolved a paradigm for generating payload timelines for Skylab, Spacelab, various other Shuttle payloads, and the International Space Station. The current paradigm starts by collecting the requirements, called "tasks models," from the scientists and technologists for the tasks that they want to be done. Because of shortcomings in the current modeling schema, some requirements are entered as notes. Next a cadre with knowledge of vehicle and hardware modifies these models to encompass and be compatible with the hardware model; again, notes are added when the modeling schema does not provide a better way to represent the requirements. Finally, another cadre further modifies the models to be compatible with the scheduling engine. This last cadre also submits the models to the scheduling engine or builds the timeline manually to accommodate requirements that are expressed in notes. A future paradigm would provide a scheduling engine that accepts separate science models and hardware models. The modeling schema would have the capability to represent all the requirements without resorting to notes. Furthermore, the scheduling engine would not require that the models be modified to account for the capabilities (limitations) of the scheduling engine. The enabling technology under development at Marshall has three major components. (1) A new modeling schema allows expressing all the requirements of the tasks without resorting to notes or awkward contrivances. The chosen modeling schema is both maximally expressive and easy to use. It utilizes graphics methods to show hierarchies of task constraints and networks of temporal relationships. (2) A new scheduling algorithm automatically schedules the models

  17. An algorithm for a single machine scheduling problem with sequence dependent setup times and scheduling windows

    NASA Technical Reports Server (NTRS)

    Moore, J. E.

    1975-01-01

    An enumeration algorithm is presented for solving a scheduling problem similar to the single machine job shop problem with sequence dependent setup times. The scheduling problem differs from the job shop problem in two ways. First, its objective is to select an optimum subset of the available tasks to be performed during a fixed period of time. Secondly, each task scheduled is constrained to occur within its particular scheduling window. The algorithm is currently being used to develop typical observational timelines for a telescope that will be operated in earth orbit. Computational times associated with timeline development are presented.

  18. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    NASA Technical Reports Server (NTRS)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  19. Chained and tandem fixed-interval schedules of punishment1

    PubMed Central

    Silverman, Philip J.

    1971-01-01

    Pigeons' key pecks were both punished with electric shock on four-component chained and tandem fixed-interval schedules and reinforced on a variable-interval schedule of food presentation. Pecking was suppressed less in the early components of the chained schedule than in the early components of the tandem schedule. Related multiple and mixed schedules of punishment were also presented; these schedules were identical to the chained and tandem schedules, respectively, except that components changed independently of responding. Similar effects were obtained, in that responding was suppressed in all components of the mixed schedule and only in the fourth component of the multiple schedule of punishment. The performances maintained on the chained and tandem schedules of punishment were generally symmetrical to those found in analogous chained and tandem schedules of food reinforcement. PMID:16811527

  20. Routine environmental monitoring schedule, calendar year 1998

    SciTech Connect

    McKinney, S.M.

    1997-11-24

    This document provides the Environmental Restorations Contractor (ERC) and the Project Hanford Management Contractor (PHMC) a schedule in accordance with the HNF-PRO-454, Inactive Waste Sites` HNF-PRO-455, Solid Waste 3 Management4 and BHI-EE-02, Environmental Requirements, of monitoring and sampling, routines for the near-facility environmental monitoring program during calendar year (CY) 1998. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Environmental Monitoring and Investigations. The survey frequencies for particular sites are determined by the technical judgment of Environmental Monitoring and investigations and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1999. The outside perimeter road surveys of 200 East and West Area and the rail survey from the 300 Area to Columbia Center will be performed in the year 2000 per agreement with Department of Energy, Richland Field Office. This schedule does not discuss staffing needs, nor does it list the monitoring equipment to be used in completing specific routines. Personnel performing routines to meet this schedule shall communicate any need for 1332 assistance in completing these routines to Radiological Control management and Environmental Monitoring and Investigations. After each routine survey is completed, a copy of the survey record, maps, and data sheets will be forwarded to Environmental Monitoring and Investigations. These routine surveys will not be considered complete until this

  1. System/360 Computer Assisted Network Scheduling (CANS) System

    NASA Technical Reports Server (NTRS)

    Brewer, A. C.

    1972-01-01

    Computer assisted scheduling techniques that produce conflict-free and efficient schedules have been developed and implemented to meet needs of the Manned Space Flight Network. CANS system provides effective management of resources in complex scheduling environment. System is automated resource scheduling, controlling, planning, information storage and retrieval tool.

  2. 14 CFR 399.81 - Unrealistic or deceptive scheduling.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false Unrealistic or deceptive scheduling. 399.81... Unrealistic or deceptive scheduling. (a) The unrealistic scheduling of flights by any air carrier providing scheduled passenger air transportation is an unfair or deceptive practice and an unfair method...

  3. 14 CFR 399.81 - Unrealistic or deceptive scheduling.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false Unrealistic or deceptive scheduling. 399.81... Unrealistic or deceptive scheduling. (a) The unrealistic scheduling of flights by any air carrier providing scheduled passenger air transportation is an unfair or deceptive practice and an unfair method...

  4. 14 CFR 399.81 - Unrealistic or deceptive scheduling.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false Unrealistic or deceptive scheduling. 399.81... Unrealistic or deceptive scheduling. (a) The unrealistic scheduling of flights by any air carrier providing scheduled passenger air transportation is an unfair or deceptive practice and an unfair method...

  5. 14 CFR 399.81 - Unrealistic or deceptive scheduling.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Unrealistic or deceptive scheduling. 399.81... Unrealistic or deceptive scheduling. (a) The unrealistic scheduling of flights by any air carrier providing scheduled passenger air transportation is an unfair or deceptive practice and an unfair method...

  6. 14 CFR 399.81 - Unrealistic or deceptive scheduling.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Unrealistic or deceptive scheduling. 399.81... Unrealistic or deceptive scheduling. (a) It is the policy of the Board to consider unrealistic scheduling of flights by any air carrier providing scheduled passenger air transportation to be an unfair or...

  7. A Procedure for Thinning the Schedule of Time-Out

    ERIC Educational Resources Information Center

    Donaldson, Jeanne M.; Vollmer, Timothy R.

    2012-01-01

    Few studies have evaluated ways to thin punishment schedules. The purpose of this study was to examine the effects of using variable ratio (VR) schedules to thin the time-out schedule gradually. Warnings were used in some conditions to assist potentially with schedule thinning, but this analysis was limited. Participants were 3 young students who…

  8. 15 CFR 30.61 - Statistical classification schedules.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 1 2012-01-01 2012-01-01 false Statistical classification schedules... § 30.61 Statistical classification schedules. The following statistical classification schedules are....census.gov/trade. (a) Schedule B—Statistical Classification for Domestic and Foreign Commodities...

  9. 15 CFR 30.61 - Statistical classification schedules.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 1 2011-01-01 2011-01-01 false Statistical classification schedules... § 30.61 Statistical classification schedules. The following statistical classification schedules are....census.gov/trade. (a) Schedule B—Statistical Classification for Domestic and Foreign Commodities...

  10. 15 CFR 30.61 - Statistical classification schedules.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 1 2013-01-01 2013-01-01 false Statistical classification schedules... § 30.61 Statistical classification schedules. The following statistical classification schedules are....census.gov/trade. (a) Schedule B—Statistical Classification for Domestic and Foreign Commodities...

  11. 15 CFR 30.61 - Statistical classification schedules.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 15 Commerce and Foreign Trade 1 2014-01-01 2014-01-01 false Statistical classification schedules... § 30.61 Statistical classification schedules. The following statistical classification schedules are....census.gov/trade. (a) Schedule B—Statistical Classification for Domestic and Foreign Commodities...

  12. 12 CFR 1780.33 - Scheduling and prehearing conferences.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 7 2011-01-01 2011-01-01 false Scheduling and prehearing conferences. 1780.33... Proceedings § 1780.33 Scheduling and prehearing conferences. (a) Scheduling conference. Within 30 days of... time and place prior to the hearing or to confer by telephone for the purpose of scheduling the course...

  13. 5 CFR 610.121 - Establishment of work schedules.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Establishment of work schedules. 610.121 Section 610.121 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS HOURS OF DUTY Weekly and Daily Scheduling of Work Work Schedules § 610.121 Establishment of work schedules. (a...

  14. Block Scheduling: Center for School Success Promising Practices Series

    ERIC Educational Resources Information Center

    Imbimbo, Josephine; Gilkes, Alwyn

    2009-01-01

    This publication focuses on block scheduling. Alternative scheduling models--usually called "block scheduling" because they involve blocks of time for student learning--restructure the school day. Schools may adopt block scheduling to create more productive and personal relationships among teachers and students, to design challenging…

  15. 12 CFR 747.31 - Scheduling and prehearing conferences.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 6 2010-01-01 2010-01-01 false Scheduling and prehearing conferences. 747.31... of Practice and Procedure § 747.31 Scheduling and prehearing conferences. (a) Scheduling conference... purpose of scheduling the recourse and conduct of the proceeding. This meeting or telephone conference is...

  16. 12 CFR 1780.33 - Scheduling and prehearing conferences.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Scheduling and prehearing conferences. 1780.33... Proceedings § 1780.33 Scheduling and prehearing conferences. (a) Scheduling conference. Within 30 days of... time and place prior to the hearing or to confer by telephone for the purpose of scheduling the course...

  17. 12 CFR 908.53 - Scheduling and prehearing conferences.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 7 2010-01-01 2010-01-01 false Scheduling and prehearing conferences. 908.53....53 Scheduling and prehearing conferences. (a) Scheduling conference. Within thirty (30) days of... specified time and place prior to the hearing or to confer by telephone for the purpose of scheduling the...

  18. 12 CFR 509.31 - Scheduling and prehearing conferences.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Scheduling and prehearing conferences. 509.31... Scheduling and prehearing conferences. (a) Scheduling conference. Within 30 days of service of the notice or... prior to the hearing or to confer by telephone for the purpose of scheduling the course and conduct of...

  19. 12 CFR 747.31 - Scheduling and prehearing conferences.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 6 2011-01-01 2011-01-01 false Scheduling and prehearing conferences. 747.31... of Practice and Procedure § 747.31 Scheduling and prehearing conferences. (a) Scheduling conference... purpose of scheduling the recourse and conduct of the proceeding. This meeting or telephone conference is...

  20. 12 CFR 908.53 - Scheduling and prehearing conferences.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 7 2011-01-01 2011-01-01 false Scheduling and prehearing conferences. 908.53....53 Scheduling and prehearing conferences. (a) Scheduling conference. Within thirty (30) days of... specified time and place prior to the hearing or to confer by telephone for the purpose of scheduling the...

  1. 12 CFR 509.31 - Scheduling and prehearing conferences.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 5 2011-01-01 2011-01-01 false Scheduling and prehearing conferences. 509.31... Scheduling and prehearing conferences. (a) Scheduling conference. Within 30 days of service of the notice or... prior to the hearing or to confer by telephone for the purpose of scheduling the course and conduct of...

  2. 5 CFR 610.121 - Establishment of work schedules.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 1 2011-01-01 2011-01-01 false Establishment of work schedules. 610.121 Section 610.121 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS HOURS OF DUTY Weekly and Daily Scheduling of Work Work Schedules § 610.121 Establishment of work schedules. (a...

  3. 39 CFR 3020.11 - Initial Mail Classification Schedule.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 39 Postal Service 1 2013-07-01 2013-07-01 false Initial Mail Classification Schedule. 3020.11 Section 3020.11 Postal Service POSTAL REGULATORY COMMISSION PERSONNEL PRODUCT LISTS Mail Classification Schedule § 3020.11 Initial Mail Classification Schedule. The initial Mail Classification Schedule...

  4. 39 CFR 3020.11 - Initial Mail Classification Schedule.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 39 Postal Service 1 2012-07-01 2012-07-01 false Initial Mail Classification Schedule. 3020.11 Section 3020.11 Postal Service POSTAL REGULATORY COMMISSION PERSONNEL PRODUCT LISTS Mail Classification Schedule § 3020.11 Initial Mail Classification Schedule. The initial Mail Classification Schedule...

  5. 39 CFR 3020.11 - Initial Mail Classification Schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 39 Postal Service 1 2010-07-01 2010-07-01 false Initial Mail Classification Schedule. 3020.11 Section 3020.11 Postal Service POSTAL REGULATORY COMMISSION PERSONNEL PRODUCT LISTS Mail Classification Schedule § 3020.11 Initial Mail Classification Schedule. The initial Mail Classification Schedule...

  6. 39 CFR 3020.11 - Initial Mail Classification Schedule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 39 Postal Service 1 2011-07-01 2011-07-01 false Initial Mail Classification Schedule. 3020.11 Section 3020.11 Postal Service POSTAL REGULATORY COMMISSION PERSONNEL PRODUCT LISTS Mail Classification Schedule § 3020.11 Initial Mail Classification Schedule. The initial Mail Classification Schedule...

  7. 39 CFR 3020.11 - Initial Mail Classification Schedule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 39 Postal Service 1 2014-07-01 2014-07-01 false Initial Mail Classification Schedule. 3020.11 Section 3020.11 Postal Service POSTAL REGULATORY COMMISSION PERSONNEL PRODUCT LISTS Mail Classification Schedule § 3020.11 Initial Mail Classification Schedule. The initial Mail Classification Schedule...

  8. An Examination of the Balanced School Day Schedule

    ERIC Educational Resources Information Center

    Woehrle, Trisha; Fox, Susan; Hoskin, Brenda

    2005-01-01

    Principals are always looking for effective ways to enhance the learning environment. The Balanced School Day (BSD) schedule, an alternative to the traditional schedule, reframes the school day by eliminating recess and lunch breaks and providing two scheduled nutrition breaks. Advantages and disadvantages to the schedule have been anecdotally…

  9. High School Physical Education Teacher Perceptions of Block Scheduling

    ERIC Educational Resources Information Center

    Rikard, G. Linda; Banville, Dominique

    2005-01-01

    In recent years, the blocked class schedule has replaced the shorter traditional schedule in high schools throughout the United States. In order to study this change, these researchers examined physical education teacher perceptions of their experience teaching on a block schedule compared to the traditional schedule. The views of fifteen physical…

  10. Evaluation of scheduling techniques for payload activity planning

    NASA Technical Reports Server (NTRS)

    Bullington, Stanley F.

    1991-01-01

    Two tasks related to payload activity planning and scheduling were performed. The first task involved making a comparison of space mission activity scheduling problems with production scheduling problems. The second task consisted of a statistical analysis of the output of runs of the Experiment Scheduling Program (ESP). Details of the work which was performed on these two tasks are presented.

  11. 40 CFR Appendix I to Part 86 - Urban Dynamometer Schedules

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 19 2010-07-01 2010-07-01 false Urban Dynamometer Schedules I Appendix... Appendix I to Part 86—Urban Dynamometer Schedules (a) EPA Urban Dynamometer Driving Schedule for Light-Duty Vehicles and Light-Duty Trucks. EPA Urban Dynamometer Driving Schedule Time (sec.) Speed (m.p.h.) Time (sec...

  12. Dry kiln schedules for commercial woods : temperate and tropical

    Treesearch

    R. Sidney Boone; Charles J. Kozlik; Paul J. Bois; Eugene M. Wengert

    1988-01-01

    This report contains suggested dry kiln schedules for over 500 commercial woods, both temperate and tropical. Kiln schedules are completely assembled and written out for easy use. Schedules for several thicknesses and specialty products (e.g. squares, handle stock, gunstock blanks) are given for many species. The majority of the schedules are from the world literature...

  13. Automated Scheduling of Science Activities for Titan Encounters by Cassini

    NASA Technical Reports Server (NTRS)

    Ray, Trina L.; Knight, Russel L.; Mohr, Dave

    2014-01-01

    In an effort to demonstrate the efficacy of automated planning and scheduling techniques for large missions, we have adapted ASPEN (Activity Scheduling and Planning Environment) [1] and CLASP (Compressed Large-scale Activity Scheduling and Planning) [2] to the domain of scheduling high-level science goals into conflict-free operations plans for Titan encounters by the Cassini spacecraft.

  14. Single-Sample Discrimination of Different Schedules' Reinforced Interresponse Times

    ERIC Educational Resources Information Center

    Tanno, Takayuki; Silberberg, Alan; Sakagami, Takayuki

    2009-01-01

    Food-deprived rats in Experiment 1 responded to one of two tandem schedules that were, with equal probability, associated with a sample lever. The tandem schedules' initial links were different random-interval schedules. Their values were adjusted to approximate equality in time to completing each tandem schedule's response requirements. The…

  15. Planning and Scheduling for Environmental Sensor Networks

    NASA Astrophysics Data System (ADS)

    Frank, J. D.

    2005-12-01

    Environmental Sensor Networks are a new way of monitoring the environment. They comprise autonomous sensor nodes in the environment that record real-time data, which is retrieved, analyzed, integrated with other data sets (e.g. satellite images, GIS, process models) and ultimately lead to scientific discoveries. Sensor networks must operate within time and resource constraints. Sensors have limited onboard memory, energy, computational power, communications windows and communications bandwidth. The value of data will depend on when, where and how it was collected, how detailed the data is, how long it takes to integrate the data, and how important the data was to the original scientific question. Planning and scheduling of sensor networks is necessary for effective, safe operations in the face of these constraints. For example, power bus limitations may preclude sensors from simultaneously collecting data and communicating without damaging the sensor; planners and schedulers can ensure these operations are ordered so that they do not happen simultaneously. Planning and scheduling can also ensure best use of the sensor network to maximize the value of collected science data. For example, if data is best recorded using a particular camera angle but it is costly in time and energy to achieve this, planners and schedulers can search for times when time and energy are available to achieve the optimal camera angle. Planning and scheduling can handle uncertainty in the problem specification; planners can be re-run when new information is made available, or can generate plans that include contingencies. For example, if bad weather may prevent the collection of data, a contingent plan can check lighting conditions and turn off data collection to save resources if lighting is not ideal. Both mobile and immobile sensors can benefit from planning and scheduling. For example, data collection on otherwise passive sensors can be halted to preserve limited power and memory

  16. Scheduling Future Water Supply Investments Under Uncertainty

    NASA Astrophysics Data System (ADS)

    Huskova, I.; Matrosov, E. S.; Harou, J. J.; Kasprzyk, J. R.; Reed, P. M.

    2014-12-01

    Uncertain hydrological impacts of climate change, population growth and institutional changes pose a major challenge to planning of water supply systems. Planners seek optimal portfolios of supply and demand management schemes but also when to activate assets whilst considering many system goals and plausible futures. Incorporation of scheduling into the planning under uncertainty problem strongly increases its complexity. We investigate some approaches to scheduling with many-objective heuristic search. We apply a multi-scenario many-objective scheduling approach to the Thames River basin water supply system planning problem in the UK. Decisions include which new supply and demand schemes to implement, at what capacity and when. The impact of different system uncertainties on scheme implementation schedules are explored, i.e. how the choice of future scenarios affects the search process and its outcomes. The activation of schemes is influenced by the occurrence of extreme hydrological events in the ensemble of plausible scenarios and other factors. The approach and results are compared with a previous study where only the portfolio problem is addressed (without scheduling).

  17. Empirical results on scheduling and dynamic backtracking

    NASA Technical Reports Server (NTRS)

    Boddy, Mark S.; Goldman, Robert P.

    1994-01-01

    At the Honeywell Technology Center (HTC), we have been working on a scheduling problem related to commercial avionics. This application is large, complex, and hard to solve. To be a little more concrete: 'large' means almost 20,000 activities, 'complex' means several activity types, periodic behavior, and assorted types of temporal constraints, and 'hard to solve' means that we have been unable to eliminate backtracking through the use of search heuristics. At this point, we can generate solutions, where solutions exist, or report failure and sometimes why the system failed. To the best of our knowledge, this is among the largest and most complex scheduling problems to have been solved as a constraint satisfaction problem, at least that has appeared in the published literature. This abstract is a preliminary report on what we have done and how. In the next section, we present our approach to treating scheduling as a constraint satisfaction problem. The following sections present the application in more detail and describe how we solve scheduling problems in the application domain. The implemented system makes use of Ginsberg's Dynamic Backtracking algorithm, with some minor extensions to improve its utility for scheduling. We describe those extensions and the performance of the resulting system. The paper concludes with some general remarks, open questions and plans for future work.

  18. Hybrid Scheduling Model for Independent Grid Tasks

    PubMed Central

    Shanthini, J.; Kalaikumaran, T.; Karthik, S.

    2015-01-01

    Grid computing facilitates the resource sharing through the administrative domains which are geographically distributed. Scheduling in a distributed heterogeneous environment is intrinsically very hard because of the heterogeneous nature of resource collection. Makespan and tardiness are two different measures of scheduling, and many of the previous researches concentrated much on reduction of makespan, which measures the machine utilization. In this paper, we propose a hybrid scheduling algorithm for scheduling independent grid tasks with the objective of reducing total weighted tardiness of grid tasks. Tardiness is to measure the due date performance, which has a direct impact on cost for executing the jobs. In this paper we propose BG_ATC algorithm which is a combination of best gap (BG) search and Apparent Tardiness Cost (ATC) indexing algorithm. Furthermore, we implemented these two algorithms in two different phases of the scheduling process. In addition to that, the comparison was made on results with various benchmark algorithms and the experimental results show that our algorithm outperforms the benchmark algorithms. PMID:26543897

  19. Teaching Chemistry in the Block Schedule

    NASA Astrophysics Data System (ADS)

    Craven, Sally

    2001-04-01

    Block scheduling, which refers to an arrangement of class time into fewer, longer periods that make up a school day, has been adopted by many high schools across America. Taking fewer classes per day reduces the instructional time lost to transitions. Students like having an extra day to complete homework assignments, and teachers gain an 85-minute planning period every day. With the extended periods of class time available, teachers can build toward higher-order thinking skills and explore connections between disciplines. Collaborative learning and other forms of group learning are ideal for block scheduling. For instance, when studying kinetic theory and phase changes, students are divided into groups and each group becomes an expert on a state of matter. The extended class period allows students within the group to cover the necessary material during two class meetings. With the block schedule it is possible to accomplish prelab questioning, the activity, and postlab analysis in the same day. Successful implementation was made possible through ongoing professional development, creation of an in-house block scheduling expert, and orientation for students and parents on time management and block scheduling.

  20. [Decision rules to schedule patient appointments].

    PubMed

    Sepúlveda R, Juan Pedro; Berroeta M, Cristián

    2012-07-01

    Outpatient scheduling has a significant impact on the perceived quality of service by the users and the efficient use of resources in the health system. There are mathematical methods that assist in solving this problem, but are seldom applied. To propose decision rules that are based on the own conditions of each institution and indicate which appointment system is the most suitable for the decision makers. Through computer simulation, the effect of a wide range of decision and environmental factors over the appointment systems performance was assessed, in order to determine how these factors affect them. Considering performance indicators associated to the patient's satisfaction and resources utilization, scheduling shorter length patients (e.g. check-up patients) in the beginning of the working day resulted to be in the efficient solutions frontier, as well as scheduling patients in one person blocks (shifting to multiple patient blocks only if resources utilization indicators are prioritized). Performance indicators are more sensitive to the sequence used to schedule different length patients, rather than the number of patients scheduled per block. Moreover, decision rules based on the institution priorities are proposed, which are quite robust to environmental factors.

  1. Generalized multiprocessor scheduling for directed acylic graphs

    SciTech Connect

    Prasanna, G.N.S.; Musicus, B.R.

    1994-12-31

    This paper considerably extends the multiprocessor scheduling techniques in the authors` previous work, and applies it to matrix arithmetic compilation. In that paper, they presented several new results in the theory of homogeneous multiprocessor scheduling. A directed acyclic graph (DAG) of tasks is to be scheduled. Tasks are assumed to be parallelizable -- as more processors are applied to a task, the time taken to compute it decreases, yielding some speedup. Because of communication, synchronization, and task scheduling overhead, this speedup increases less than linearly with the number of processors applied. The optimal scheduling problem is to determine the number of processors assigned to each task, and task sequencing, to minimize the finishing time. Using optimal control theory, in the special case where the speedup function of each task is p{sup {alpha}}, where p is the amount of processing power applied to the task, a closed form solution for task graphs formed from parallel and series connections was derived. This paper extends these results for arbitrary DAGS. The optimality conditions impose nonlinear constraints on the flow of processing power from predecessors to successors, and on the finishing times of siblings. This paper presents a fast algorithm for determining and solving these nonlinear equations. The algorithm utilizes the structure of the finishing time equations to efficiently run a conjugate gradient minimization, leading to the optimal solution. The algorithm has been tested on a variety of DAGS. The results presented show that it is superior to alternative heuristic approaches.

  2. Hybrid Scheduling Model for Independent Grid Tasks.

    PubMed

    Shanthini, J; Kalaikumaran, T; Karthik, S

    2015-01-01

    Grid computing facilitates the resource sharing through the administrative domains which are geographically distributed. Scheduling in a distributed heterogeneous environment is intrinsically very hard because of the heterogeneous nature of resource collection. Makespan and tardiness are two different measures of scheduling, and many of the previous researches concentrated much on reduction of makespan, which measures the machine utilization. In this paper, we propose a hybrid scheduling algorithm for scheduling independent grid tasks with the objective of reducing total weighted tardiness of grid tasks. Tardiness is to measure the due date performance, which has a direct impact on cost for executing the jobs. In this paper we propose BG_ATC algorithm which is a combination of best gap (BG) search and Apparent Tardiness Cost (ATC) indexing algorithm. Furthermore, we implemented these two algorithms in two different phases of the scheduling process. In addition to that, the comparison was made on results with various benchmark algorithms and the experimental results show that our algorithm outperforms the benchmark algorithms.

  3. Alternative work schedules for female pharmacists.

    PubMed

    Mason, N A; Perry, W R; Ryan, M L

    1991-01-01

    The impact of the increased proportion of women in pharmacy is discussed, and two leadership positions for which part-time work schedules were implemented are described. Issues associated with the increased representation of women include pharmacist shortages, loss of future leaders, decreased staff productivity related to inadequate day-care services, and a reduced earning potential of pharmacists. Many of these problems can be addressed by altering benefit packages and work schedules to enable employees to raise children while continuing to work. Specific strategies include legislation, day-care programs, flex time and flex scheduling, telecommuting, and the creation of alternative work schedules or permanent part-time positions. At the University of Michigan, a part-time position that combines faculty and clinical responsibilities has been in place since 1988. At The Washington Hospital Center, one of the three assistant director of pharmacy positions is part-time. The women in both positions have met or exceeded job performance requirements while raising a family. Issues raised by the increasing number of female pharmacists must be addressed by the profession. Part-time work schedules are one strategy for enabling female pharmacists to meet both their family and career responsibilities.

  4. Quay crane scheduling with dual cycling

    NASA Astrophysics Data System (ADS)

    Wang, Dandan; Li, Xiaoping

    2015-10-01

    In this article, the dual cycling quay crane scheduling problem (D-QCSP) with hatches is addressed to minimize the operation cycles of quay cranes. The problem is decomposed into two sub-problems: the intra-group stage (sequencing stacks within each hatch) and the inter-group stage (scheduling all hatches). A new stack sequencing method is constructed for stacks of each hatch, which is modelled as a two-machine non-permutation flow shop scheduling problem. By removing inner gaps using left-shifting, the adapted hatch scheduling sub-problem is modelled as a two-machine grouped flow shop scheduling problem, which contains more precise processing times. A composite heuristic is proposed for the D-QCSP. Based on the derived lower bound, the heuristic is compared with the best existing heuristics on a large number of instances. Experimental results illustrate that the proposal outperforms the existing methods on all instances and dual cycling needs many fewer quay crane operating cycles than single cycling.

  5. Integrated network design and scheduling problems :

    SciTech Connect

    Nurre, Sarah G.; Carlson, Jeffrey J.

    2014-01-01

    We consider the class of integrated network design and scheduling problems. These problems focus on selecting and scheduling operations that will change the characteristics of a network, while being speci cally concerned with the performance of the network over time. Motivating applications of INDS problems include infrastructure restoration after extreme events and building humanitarian distribution supply chains. While similar models have been proposed, no one has performed an extensive review of INDS problems from their complexity, network and scheduling characteristics, information, and solution methods. We examine INDS problems under a parallel identical machine scheduling environment where the performance of the network is evaluated by solving classic network optimization problems. We classify that all considered INDS problems as NP-Hard and propose a novel heuristic dispatching rule algorithm that selects and schedules sets of arcs based on their interactions in the network. We present computational analysis based on realistic data sets representing the infrastructures of coastal New Hanover County, North Carolina, lower Manhattan, New York, and a realistic arti cial community CLARC County. These tests demonstrate the importance of a dispatching rule to arrive at near-optimal solutions during real-time decision making activities. We extend INDS problems to incorporate release dates which represent the earliest an operation can be performed and exible release dates through the introduction of specialized machine(s) that can perform work to move the release date earlier in time. An online optimization setting is explored where the release date of a component is not known.

  6. Conjoint schedules of timeout deletion in pigeons.

    PubMed Central

    Hackenberg, T D

    1992-01-01

    This experiment attempted to bring behavior under joint control of two distinct contingencies, one that provided food and a second that extended the periods during which that food was available. Pigeons' responses on each of two keys were reinforced according to a single random-interval schedule of food presentation except during signaled timeout periods during which the schedule was temporarily disabled. By means of a conjoint schedule, responses on the initially less preferred key not only produced food but also canceled impending timeouts. When behavior came to predominate on this conjoint alternative, the consequences of responding on the two keys were reversed. Responding in 3 of 4 pigeons proved sensitive to the conjoint scheduled consequences, as evidenced by systematic shifts in response rates favoring the conjoint key. In 2 of these 3 pigeons, sensitivity to the conjoint contingency was evident under time-in:timeout ratios of 2:1 (time-in = 120 s, timeout = 60 s) and 1:5 (time-in = 30 s, timeout = 150 s), whereas for the other pigeon preference for the conjoint key was observed only under the latter sequence of conditions. There was only weak evidence of control by the conjoint scheduled consequences in the 4th subject, despite extended training and forced exposure to the conjoint alternative. The overall pattern of results is consistent with studies of timeout avoidance but also shares features in common with positively reinforced behavior. PMID:1402605

  7. SDRAM bus schedule of HDTV video decoder

    NASA Astrophysics Data System (ADS)

    Wang, Hui; He, Yan L.; Yu, Lu

    2001-12-01

    In this paper, a time division multiplexed task scheduling (TDM) is designed for HDTV video decoder is proposed. There are three tasks: to fetch decoded data from SDRAM for displaying (DIS), read the reference data from SDRAM for motion compensating (REF) and write the motion compensated data back to SDRAM (WB) on the bus. The proposed schedule is based on the novel 4 banks interlaced SDRAM storage structure which results in less overhead on read/write time. Two SDRAM of 64M bits (4Bank×512K×32bit) are used. Compared with two banks, the four banks storage strategy read/write data with 45% less time. Therefore the process data rates for those three tasks are reduced. TDM is developed by round robin scheduling and fixed slot allocating. There are both MB slot and task slot. As a result the conflicts on bus are avoided, and the buffer size is reduced 48% compared with the priority bus scheduling. Moreover, there is a compacted bus schedule for the worst case of stuffing owning to the reduced executing time on tasks. The size of buffer is reduced and the control logic is simplified.

  8. Buffer Size Setting Method for DBR Scheduling

    NASA Astrophysics Data System (ADS)

    Park, Soonyoung; Woo, Kiyun; Fujimura, Shigeru

    There are many kinds of delay in real-world production systems caused by many reasons including unexpected accidents. A delay of order may inflict great damages for not only itself but also the other affected orders. To prevent these types of loss from frequent delay, DBR (Drum-Buffer-Rope) scheduling method of TOC (Theory of Constraints) manages production schedule observing the state of time buffers. The current buffer size setting method for DBR scheduling is very simple and depends on user's experience. Although it makes possible to keep the due time for production orders, it leads to the redundant production lead time and stock. For DBR scheduling, it is not clear how the buffer size should be set. Therefore, this paper proposes a buffer size setting method for DBR scheduling providing a numerical model for the buffer size. In addition, a simulation gives the result of comparison between the current method and the proposed method, and the effect of the proposed method is shown.

  9. A Practical Variation of a Multiple-Schedule Procedure: Brief Schedule-Correlated Stimuli

    ERIC Educational Resources Information Center

    Tiger, Jeffrey H.; Hanley, Gregory P.; Larsen, Kylie M.

    2008-01-01

    Multiple schedules using continuous discriminative stimuli have been used to minimize children's disruptive requesting for teacher attention (e.g., colored floral leis; Tiger & Hanley, 2004; Tiger, Hanley, & Heal, 2006). The present study evaluated the effectiveness of, and children's preferences for, two multiple-schedule arrangements in which…

  10. Investigations into Generalization of Constraint-Based Scheduling Theories with Applications to Space Telescope Observation Scheduling

    NASA Technical Reports Server (NTRS)

    Muscettola, Nicola; Smith, Steven S.

    1996-01-01

    This final report summarizes research performed under NASA contract NCC 2-531 toward generalization of constraint-based scheduling theories and techniques for application to space telescope observation scheduling problems. Our work into theories and techniques for solution of this class of problems has led to the development of the Heuristic Scheduling Testbed System (HSTS), a software system for integrated planning and scheduling. Within HSTS, planning and scheduling are treated as two complementary aspects of the more general process of constructing a feasible set of behaviors of a target system. We have validated the HSTS approach by applying it to the generation of observation schedules for the Hubble Space Telescope. This report summarizes the HSTS framework and its application to the Hubble Space Telescope domain. First, the HSTS software architecture is described, indicating (1) how the structure and dynamics of a system is modeled in HSTS, (2) how schedules are represented at multiple levels of abstraction, and (3) the problem solving machinery that is provided. Next, the specific scheduler developed within this software architecture for detailed management of Hubble Space Telescope operations is presented. Finally, experimental performance results are given that confirm the utility and practicality of the approach.

  11. A Practical Variation of a Multiple-Schedule Procedure: Brief Schedule-Correlated Stimuli

    ERIC Educational Resources Information Center

    Tiger, Jeffrey H.; Hanley, Gregory P.; Larsen, Kylie M.

    2008-01-01

    Multiple schedules using continuous discriminative stimuli have been used to minimize children's disruptive requesting for teacher attention (e.g., colored floral leis; Tiger & Hanley, 2004; Tiger, Hanley, & Heal, 2006). The present study evaluated the effectiveness of, and children's preferences for, two multiple-schedule arrangements in which…

  12. Considerations for Using an Incremental Scheduler for Human Exploration Task Scheduling

    NASA Technical Reports Server (NTRS)

    Jaap, John; Phillips, Shaun

    2005-01-01

    As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and objectives are met and resources are not overbooked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks.

  13. The Probability of Small Schedule Values and Preference for Random-Interval Schedules

    ERIC Educational Resources Information Center

    Soreth, Michelle Ennis; Hineline, Philip N.

    2009-01-01

    Preference for working on variable schedules and temporal discrimination were simultaneously examined in two experiments using a discrete-trial, concurrent-chains arrangement with fixed interval (FI) and random interval (RI) terminal links. The random schedule was generated by first sampling a probability distribution after the programmed delay to…

  14. Recent reinforcement-schedule research and applied behavior analysis

    PubMed Central

    Lattal, Kennon A.; Neef, Nancy A.

    1996-01-01

    Reinforcement schedules are considered in relation to applied behavior analysis by examining several recent laboratory experiments with humans and other animals. The experiments are drawn from three areas of contemporary schedule research: behavioral history effects on schedule performance, the role of instructions in schedule performance of humans, and dynamic schedules of reinforcement. All of the experiments are discussed in relation to the role of behavioral history in current schedule performance. The paper concludes by extracting from the experiments some more general issues concerning reinforcement schedules in applied research and practice. PMID:16795888

  15. Dummy-Based Critical Chain Scheduling in Project Management

    NASA Astrophysics Data System (ADS)

    Suwa, Haruhiko; Morita, Daisuke; Sandoh, Hiroaki

    This paper proposes a new critical chain scheduling method in project management. The authors have already proposed a theoretical model, which provides an optimal total size of dummies to be inserted in the initial project schedule. Dummies, which are occasionally referred to as buffer, are useful to absorb schedule delays caused by a variety of uncertainties. Given the total size of dummies, this study explores for some useful rules under which we should allocate the dummies in the initial project schedule to generate buffered schedule. Some computational experiments derives several important properties of buffered schedules with a view to demonstrating the effectiveness of those rules particularly in critical chain scheduling.

  16. A heuristic approach to incremental and reactive scheduling

    NASA Technical Reports Server (NTRS)

    Odubiyi, Jide B.; Zoch, David R.

    1989-01-01

    An heuristic approach to incremental and reactive scheduling is described. Incremental scheduling is the process of modifying an existing schedule if the initial schedule does not meet its stated initial goals. Reactive scheduling occurs in near real-time in response to changes in available resources or the occurrence of targets of opportunity. Only minor changes are made during both incremental and reactive scheduling because a goal of re-scheduling procedures is to minimally impact the schedule. The described heuristic search techniques, which are employed by the Request Oriented Scheduling Engine (ROSE), a prototype generic scheduler, efficiently approximate the cost of reaching a goal from a given state and effective mechanisms for controlling search.

  17. Noncontingent reinforcement: a further examination of schedule effects during treatment.

    PubMed

    Wallace, Michele D; Iwata, Brian A; Hanley, Gregory P; Thompson, Rachel H; Roscoe, Eileen M

    2012-01-01

    We conducted 2 studies to determine whether dense and thin NCR schedules exert different influences over behavior and whether these influences change as dense schedules are thinned. In Study 1, we observed that thin as well as dense NCR schedules effectively decreased problem behavior exhibited by 3 individuals. In Study 2, we compared the effects of 2 NCR schedules in multielement designs, one with and the other without an extinction (EXT) component, while both schedules were thinned. Problem behavior remained low as the NCR schedule with EXT was thinned, but either (a) did not decrease initially or (b) subsequently increased as the NCR schedule without EXT was thinned. These results suggest that dense schedules of NCR decrease behavior by altering its motivating operation but that extinction occurs as the NCR schedule is thinned. The benefits and limitations of using dense or thin NCR schedules are discussed.

  18. Schedules of Controlled Substances: Temporary Placement of U-47700 Into Schedule I. Final order.

    PubMed

    2016-11-14

    The Administrator of the Drug Enforcement Administration is issuing this final order to temporarily schedule the synthetic opioid, 3,4-dichloro-N-[2-(dimethylamino)cyclohexyl]-N-methylbenzamide (also known as U-47700), and its isomers, esters, ethers, salts and salts of isomers, esters and ethers, into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of U-47700 into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, U-47700.

  19. Schedules of Controlled Substances: Temporary Placement of Furanyl Fentanyl Into Schedule I. Final order.

    PubMed

    2016-11-29

    The Administrator of the Drug Enforcement Administration is issuing this final order to temporarily schedule the synthetic opioid, N-(1-phenethylpiperidin-4-yl)-N-phenylfuran-2-carboxamide (furanyl fentanyl), and its isomers, esters, ethers, salts and salts of isomers, esters and ethers, into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of furanyl fentanyl into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, furanyl fentanyl.

  20. A scheduling framework applied to digital publishing workflows

    NASA Astrophysics Data System (ADS)

    Lozano, Wilson; Rivera, Wilson

    2006-02-01

    This paper presents the advances in developing a dynamic scheduling technique suitable for automating digital publishing workflows. Traditionally scheduling in digital publishing has been limited to timing criteria. The proposed scheduling strategy takes into account contingency and priority fluctuations. The new scheduling algorithm, referred to as QB-MUF, gives high priority to jobs with low probability of failing according to artifact recognition and workflow modeling critera. The experimental results show the suitability and efficiency of the scheduling strategy.