Sample records for ground delay programs

  1. Interaction Between Strategic and Local Traffic Flow Controls

    NASA Technical Reports Server (NTRS)

    Grabbe, Son; Sridhar, Banavar; Mukherjee, Avijit; Morando, Alexander

    2010-01-01

    The loosely coordinated sets of traffic flow management initiatives that are operationally implemented at the national- and local-levels have the potential to under, over, and inconsistently control flights. This study is designed to explore these interactions through fast-time simulations with an emphasis on identifying inequitable situations in which flights receive multiple uncoordinated delays. Two operationally derived scenarios were considered in which flights arriving into the Dallas/Fort Worth International Airport were first controlled at the national-level, either with a Ground Delay Program or a playbook reroute. These flights were subsequently controlled at the local level. The Traffic Management Advisor assigned them arrival scheduling delays. For the Ground Delay Program scenarios, between 51% and 53% of all arrivals experience both pre-departure delays from the Ground Delay Program and arrival scheduling delays from the Traffic Management Advisor. Of the subset of flights that received multiple delays, between 5.7% and 6.4% of the internal departures were first assigned a pre-departure delay by the Ground Delay Program, followed by a second pre-departure delay as a result of the arrival scheduling. For the playbook reroute scenario, Dallas/Fort Worth International Airport arrivals were first assigned pre-departure reroutes based on the MW_2_DALLAS playbook plan, and were subsequently assigned arrival scheduling delays by the Traffic Management Advisor. Since the airport was operating well below capacity when the playbook reroute was in effect, only 7% of the arrivals were observed to receive both rerouting and arrival scheduling delays. Findings from these initial experiments confirm field observations that Ground Delay Programs operated in conjunction with arrival scheduling can result in inequitable situations in which flights receive multiple uncoordinated delays.

  2. Decision Modeling Framework to Minimize Arrival Delays from Ground Delay Programs

    NASA Astrophysics Data System (ADS)

    Mohleji, Nandita

    Convective weather and other constraints create uncertainty in air transportation, leading to costly delays. A Ground Delay Program (GDP) is a strategy to mitigate these effects. Systematic decision support can increase GDP efficacy, reduce delays, and minimize direct operating costs. In this study, a decision analysis (DA) model is constructed by combining a decision tree and Bayesian belief network. Through a study of three New York region airports, the DA model demonstrates that larger GDP scopes that include more flights in the program, along with longer lead times that provide stakeholders greater notice of a pending program, trigger the fewest average arrival delays. These findings are demonstrated to result in a savings of up to $1,850 per flight. Furthermore, when convective weather is predicted, forecast weather confidences remain the same level or greater at least 70% of the time, supporting more strategic decision making. The DA model thus enables quantification of uncertainties and insights on causal relationships, providing support for future GDP decisions.

  3. Typical teleoperator time delay profiles, phase 2. [remotely controlled manipulator arms

    NASA Technical Reports Server (NTRS)

    Wetherington, R. D.; Walsh, J. R.

    1974-01-01

    The results of the second phase of a study on time delays in communications systems applicable to the teleoperator program are presented. Estimates of the maximum time delays that will be encountered and presents time delay profiles are given for (1) ground control to teleoperator in low earth orbit, (2) ground control to teleoperator in geosynchronous orbit, and (3) low earth orbit control to teleoperator in low earth orbit.

  4. Predictive Models of Duration of Ground Delay Programs in New York Area Airports

    NASA Technical Reports Server (NTRS)

    Kulkarni, Deepak

    2011-01-01

    Initially planned GDP duration often turns out to be an underestimate or an overestimate of the actual GDP duration. This, in turn, results in avoidable airborne or ground delays in the system. Therefore, better models of actual duration have the potential of reducing delays in the system. The overall objective of this study is to develop such models based on logs of GDPs. In a previous report, we described descriptive models of Ground Delay Programs. These models were defined in terms of initial planned duration and in terms of categorical variables. These descriptive models are good at characterizing the historical errors in planned GDP durations. This paper focuses on developing predictive models of GDP duration. Traffic Management Initiatives (TMI) are logged by Air Traffic Control facilities with The National Traffic Management Log (NTML) which is a single system for automated recoding, coordination, and distribution of relevant information about TMIs throughout the National Airspace System. (Brickman, 2004 Yuditsky, 2007) We use 2008-2009 GDP data from the NTML database for the study reported in this paper. NTML information about a GDP includes the initial specification, possibly one or more revisions, and the cancellation. In the next section, we describe general characteristics of Ground Delay Programs. In the third section, we develop models of actual duration. In the fourth section, we compare predictive performance of these models. The final section is a conclusion.

  5. Data Mining for Understanding and Impriving Decision-Making Affecting Ground Delay Programs

    NASA Technical Reports Server (NTRS)

    Kulkarni, Deepak; Wang, Yao Xun; Sridhar, Banavar

    2013-01-01

    The continuous growth in the demand for air transportation results in an imbalance between airspace capacity and traffic demand. The airspace capacity of a region depends on the ability of the system to maintain safe separation between aircraft in the region. In addition to growing demand, the airspace capacity is severely limited by convective weather. During such conditions, traffic managers at the FAA's Air Traffic Control System Command Center (ATCSCC) and dispatchers at various Airlines' Operations Center (AOC) collaborate to mitigate the demand-capacity imbalance caused by weather. The end result is the implementation of a set of Traffic Flow Management (TFM) initiatives such as ground delay programs, reroute advisories, flow metering, and ground stops. Data Mining is the automated process of analyzing large sets of data and then extracting patterns in the data. Data mining tools are capable of predicting behaviors and future trends, allowing an organization to benefit from past experience in making knowledge-driven decisions. The work reported in this paper is focused on ground delay programs. Data mining algorithms have the potential to develop associations between weather patterns and the corresponding ground delay program responses. If successful, they can be used to improve and standardize TFM decision resulting in better predictability of traffic flows on days with reliable weather forecasts. The approach here seeks to develop a set of data mining and machine learning models and apply them to historical archives of weather observations and forecasts and TFM initiatives to determine the extent to which the theory can predict and explain the observed traffic flow behaviors.

  6. Modeling Weather Impact on Ground Delay Programs

    NASA Technical Reports Server (NTRS)

    Wang, Yao; Kulkarni, Deepak

    2011-01-01

    Scheduled arriving aircraft demand may exceed airport arrival capacity when there is abnormal weather at an airport. In such situations, Federal Aviation Administration (FAA) institutes ground-delay programs (GDP) to delay flights before they depart from their originating airports. Efficient GDP planning depends on the accuracy of prediction of airport capacity and demand in the presence of uncertainties in weather forecast. This paper presents a study of the impact of dynamic airport surface weather on GDPs. Using the National Traffic Management Log, effect of weather conditions on the characteristics of GDP events at selected busy airports is investigated. Two machine learning methods are used to generate models that map the airport operational conditions and weather information to issued GDP parameters and results of validation tests are described.

  7. Reduction of Weather-Related Terminal Area Delays in the Free-Flight Era

    NASA Technical Reports Server (NTRS)

    Johnson, Sally C.; Chin, David K.; Rovinsky, Robert B.; Kostiuk, Peter F.; Lee, David A.; Hemm, Robert V.; Wingrove, Earl R., III

    1996-01-01

    While much of the emphasis of the free-flight movement has been concentrated on reducing en-route delays, airport capacity is a major bottleneck in the current airspace system, particularly during bad weather. According to the Air Transport Association (ATA) Air Carrier Delay Reports, ground delays (gate-hold, taxi-in, and taxi-out) comprise 75 percent of total delays. It is likely that the projected steady growth in traffic will only exacerbate these losses. Preliminary analyses show that implementation of the terminal area technologies and procedures under development in NASA s Terminal Area Productivity program can potentially save the airlines at least $350M annually in weather-related delays by the year 2005 at Boston Logan and Detroit airports alone. This paper briefly describes the Terminal Area Productivity program, outlines the costhenefit analyses that are being conducted in support of the program, and presents some preliminary analysis results.

  8. Data Mining for Understanding and Improving Decision-making Affecting Ground Delay Programs

    NASA Technical Reports Server (NTRS)

    Kulkarni, Deepak; Wang, Yao; Sridhar, Banavar

    2013-01-01

    The continuous growth in the demand for air transportation results in an imbalance between airspace capacity and traffic demand. The airspace capacity of a region depends on the ability of the system to maintain safe separation between aircraft in the region. In addition to growing demand, the airspace capacity is severely limited by convective weather. During such conditions, traffic managers at the FAA's Air Traffic Control System Command Center (ATCSCC) and dispatchers at various Airlines' Operations Center (AOC) collaborate to mitigate the demand-capacity imbalance caused by weather. The end result is the implementation of a set of Traffic Flow Management (TFM) initiatives such as ground delay programs, reroute advisories, flow metering, and ground stops. Data Mining is the automated process of analyzing large sets of data and then extracting patterns in the data. Data mining tools are capable of predicting behaviors and future trends, allowing an organization to benefit from past experience in making knowledge-driven decisions.

  9. Relationship between Weather, Traffic and Delay Based on Empirical Methods

    NASA Technical Reports Server (NTRS)

    Sridhar, Banavar; Swei, Sean S. M.

    2006-01-01

    The steady rise in demand for air transportation over the years has put much emphasis on the need for sophisticated air traffic flow management (TFM) within the National Airspace System (NAS). The NAS refers to hardware, software and people, including runways, radars, networks, FAA, airlines, etc., involved in air traffic management (ATM) in the US. One of the metrics that has been used to assess the performance of NAS is the actual delays provided through FAA's Air Traffic Operations Network (OPSNET). The OPSNET delay data includes those reportable delays, i.e. delays of 15 minutes or more experienced by Instrument Flight Rule (IFR) flights, submitted by the FAA facilities. These OPSNET delays are caused by the application of TFM initiatives in response to, for instance, weather conditions, increased traffic volume, equipment outages, airline operations, and runway conditions. TFM initiatives such as, ground stops, ground delay programs, rerouting, airborne holding, and miles-in-trail restrictions, are actions which are needed to control the air traffic demand to mitigate the demand-capacity imbalance due to the reduction in capacity. Consequently, TFM initiatives result in NAS delays. Of all the causes, weather has been identified as the most important causal factor for NAS delays. Therefore, in order to accurately assess the NAS performance, it has become necessary to create a baseline for NAS performance and establish a model which characterizes the relation between weather and NAS delays.

  10. Space Link Extension Protocol Emulation for High-Throughput, High-Latency Network Connections

    NASA Technical Reports Server (NTRS)

    Tchorowski, Nicole; Murawski, Robert

    2014-01-01

    New space missions require higher data rates and new protocols to meet these requirements. These high data rate space communication links push the limitations of not only the space communication links, but of the ground communication networks and protocols which forward user data to remote ground stations (GS) for transmission. The Consultative Committee for Space Data Systems, (CCSDS) Space Link Extension (SLE) standard protocol is one protocol that has been proposed for use by the NASA Space Network (SN) Ground Segment Sustainment (SGSS) program. New protocol implementations must be carefully tested to ensure that they provide the required functionality, especially because of the remote nature of spacecraft. The SLE protocol standard has been tested in the NASA Glenn Research Center's SCENIC Emulation Lab in order to observe its operation under realistic network delay conditions. More specifically, the delay between then NASA Integrated Services Network (NISN) and spacecraft has been emulated. The round trip time (RTT) delay for the continental NISN network has been shown to be up to 120ms; as such the SLE protocol was tested with network delays ranging from 0ms to 200ms. Both a base network condition and an SLE connection were tested with these RTT delays, and the reaction of both network tests to the delay conditions were recorded. Throughput for both of these links was set at 1.2Gbps. The results will show that, in the presence of realistic network delay, the SLE link throughput is significantly reduced while the base network throughput however remained at the 1.2Gbps specification. The decrease in SLE throughput has been attributed to the implementation's use of blocking calls. The decrease in throughput is not acceptable for high data rate links, as the link requires constant data a flow in order for spacecraft and ground radios to stay synchronized, unless significant data is queued a the ground station. In cases where queuing the data is not an option, such as during real time transmissions, the SLE implementation cannot support high data rate communication.

  11. Analysis of Space Shuttle Ground Support System Fault Detection, Isolation, and Recovery Processes and Resources

    NASA Technical Reports Server (NTRS)

    Gross, Anthony R.; Gerald-Yamasaki, Michael; Trent, Robert P.

    2009-01-01

    As part of the FDIR (Fault Detection, Isolation, and Recovery) Project for the Constellation Program, a task was designed within the context of the Constellation Program FDIR project called the Legacy Benchmarking Task to document as accurately as possible the FDIR processes and resources that were used by the Space Shuttle ground support equipment (GSE) during the Shuttle flight program. These results served as a comparison with results obtained from the new FDIR capability. The task team assessed Shuttle and EELV (Evolved Expendable Launch Vehicle) historical data for GSE-related launch delays to identify expected benefits and impact. This analysis included a study of complex fault isolation situations that required a lengthy troubleshooting process. Specifically, four elements of that system were considered: LH2 (liquid hydrogen), LO2 (liquid oxygen), hydraulic test, and ground special power.

  12. How Funding and Policy Affect Access to and Modernization of Major Air Force Ground Test Infrastructure Assets

    DTIC Science & Technology

    2017-04-06

    center’s wind tunnels, gas turbine sea level and altitude test cells, space chambers, altitude rocket cells, ballistic ranges, arc heaters and other...number of programs, and the difficulty getting new programs approved, the services are reluctant to delay or cancel programs. Performance problems in...manpower as an indirect cost would alleviate problems with maintaining expertise. The indirect costs provide for security, base infrastructure

  13. Traffic Flow Management: Data Mining Update

    NASA Technical Reports Server (NTRS)

    Grabbe, Shon R.

    2012-01-01

    This presentation provides an update on recent data mining efforts that have been designed to (1) identify like/similar days in the national airspace system, (2) cluster/aggregate national-level rerouting data and (3) apply machine learning techniques to predict when Ground Delay Programs are required at a weather-impacted airport

  14. Advanced optical delay line demonstrator

    NASA Astrophysics Data System (ADS)

    van den Dool, Teun; Kamphues, Fred; Fouss, B.; Henrioulle, K.; Hogenhuis, Harm

    2004-09-01

    TNO TPD, in cooperation with Micromega-Dynamics and Dutch Space, has designed an advanced Optical Delay Line (ODL) for use in future ground based and space interferometry missions. The work is performed under NIVR contract in preparation for GENIE and DARWIN. Using the ESO PRIMA DDL requirements as a baseline, the delay line can be used for PRIMA and GENIE without any modifications. The delay line design is modular and flexible, which makes scaling for other applications a relatively easy task. The ODL has a single linear motor actuator for Optical Path Difference (OPD) control, driving a two-mirror cat"s eye with SiC mirrors and CFRP structure. Magnetic bearings provide frictionless and wear free operation with zerohysteresis. The delay line is currently being assembled and will be subjected to a comprehensive test program in the second half of 2004.

  15. MINEMOTION3D: A new set of Programs for Predicting Ground Motion From Explosions in Complex 3D Media

    NASA Astrophysics Data System (ADS)

    Tibuleac, I. M.; Bonner, J. L.; Orrey, J. L.; Yang, X.

    2004-12-01

    Predicting ground motion from complicated mining explosions is important for mines developing new blasting programs in regions where vibrations must be kept below certain levels. Additionally, predicting ground motion from mining explosions in complex 3D media is important for moment estimation for nuclear test treaty monitoring. Both problems have been addressed under the development of a new series of numerical prediction programs called MINEMOTION3D including 1) Generalized Fourier Methods to generate Green's functions in 3D media for a moment tensor source implementation and 2) MineSeis3D, a program that simulates seismograms for delay-fired mining explosions with a linear relationship between signals from small size individual shots. To test the programs, local recordings (5 - 23 km) of three production shots at a mine in northern Minnesota were compared to synthetic waveforms in 3D media. A non-zero value of the moment tensor component M12 was considered, to introduce a horizontal spall component into the waveform synthesis when the Green's functions were generated for each model. Methods using seismic noise crosscorrelation for improved inter-element subsurface structure estimation were also evaluated. Comparison of the observed and synthetic waveforms shows promising results. The shape and arrival times of the normalized synthetic and observed waveforms are similar for most of the stations. The synthetic and observed waveform amplitude fit is best for the vertical components in the mean 3D model and worst for the transversal components. The observed effect of spall on the waveform spectra was weak in the case of fragmentation delay fired commercial explosions. Commercial applications of the code could provide data needed for designing explosions which do not exceed ground vibration requirements posed by the U.S. Department of the Interior, Office of Surface Mining.

  16. Security Assistance: Evaluations Needed to Determine Effectiveness of U.S. Aid to Lebanon’s Security Forces

    DTIC Science & Technology

    2013-03-01

    5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES...meet conditions on the ground, according to U.S. officials. For example , the Department of State (State) delayed committing Foreign Military...agencies measure program performance. For example , GAO found in 2011 that the IMET program evaluation efforts had few of the elements commonly

  17. Measurement of Electron Density and Ion Collision Frequency with Dual Assisted Grounded Electrode DBD in Atmospheric Pressure Helium Plasma Jet

    NASA Astrophysics Data System (ADS)

    Zhou, Qiujiao; Qi, Bing; Huang, Jianjun; Pan, Lizhu; Liu, Ying

    2016-04-01

    The properties of a helium atmospheric-pressure plasma jet (APPJ) are diagnosed with a dual assisted grounded electrode dielectric barrier discharge device. In the glow discharge, we captured the current waveforms at the positions of the three grounded rings. From the current waveforms, the time delay between the adjacent positions of the rings is employed to calculate the plasma bullet velocity of the helium APPJ. Moreover, the electron density is deduced from a model combining with the time delay and current intensity, which is about 1011 cm-3. In addition, The ion-neutral particles collision frequency in the radial direction is calculated from the current phase difference between two rings, which is on the order of 107 Hz. The results are helpful for understanding the basic properties of APPJs. supported by National Natural Science Foundation of China (No. 11105093), the Technological Project of Shenzhen, China (No. JC201005280485A), and the Planned S&T Program of Shenzhen, China (No. JC201105170703A)

  18. Supervising Remote Humanoids Across Intermediate Time Delay

    NASA Technical Reports Server (NTRS)

    Hambuchen, Kimberly; Bluethmann, William; Goza, Michael; Ambrose, Robert; Rabe, Kenneth; Allan, Mark

    2006-01-01

    The President's Vision for Space Exploration, laid out in 2004, relies heavily upon robotic exploration of the lunar surface in early phases of the program. Prior to the arrival of astronauts on the lunar surface, these robots will be required to be controlled across space and time, posing a considerable challenge for traditional telepresence techniques. Because time delays will be measured in seconds, not minutes as is the case for Mars Exploration, uploading the plan for a day seems excessive. An approach for controlling humanoids under intermediate time delay is presented. This approach uses software running within a ground control cockpit to predict an immersed robot supervisor's motions which the remote humanoid autonomously executes. Initial results are presented.

  19. A Method for Scheduling Air Traffic with Uncertain En Route Capacity Constraints

    NASA Technical Reports Server (NTRS)

    Arneson, Heather; Bloem, Michael

    2009-01-01

    A method for scheduling ground delay and airborne holding for flights scheduled to fly through airspace with uncertain capacity constraints is presented. The method iteratively solves linear programs for departure rates and airborne holding as new probabilistic information about future airspace constraints becomes available. The objective function is the expected value of the weighted sum of ground and airborne delay. In order to limit operationally costly changes to departure rates, they are updated only when such an update would lead to a significant cost reduction. Simulation results show a 13% cost reduction over a rough approximation of current practices. Comparison between the proposed as needed replanning method and a similar method that uses fixed frequency replanning shows a typical cost reduction of 1% to 2%, and even up to a 20% cost reduction in some cases.

  20. Analysis and Prediction of Weather Impacted Ground Stop Operations

    NASA Technical Reports Server (NTRS)

    Wang, Yao Xun

    2014-01-01

    When the air traffic demand is expected to exceed the available airport's capacity for a short period of time, Ground Stop (GS) operations are implemented by Federal Aviation Administration (FAA) Traffic Flow Management (TFM). The GS requires departing aircraft meeting specific criteria to remain on the ground to achieve reduced demands at the constrained destination airport until the end of the GS. This paper provides a high-level overview of the statistical distributions as well as causal factors for the GSs at the major airports in the United States. The GS's character, the weather impact on GSs, GS variations with delays, and the interaction between GSs and Ground Delay Programs (GDPs) at Newark Liberty International Airport (EWR) are investigated. The machine learning methods are used to generate classification models that map the historical airport weather forecast, schedule traffic, and other airport conditions to implemented GS/GDP operations and the models are evaluated using the cross-validations. This modeling approach produced promising results as it yielded an 85% overall classification accuracy to distinguish the implemented GS days from the normal days without GS and GDP operations and a 71% accuracy to differentiate the GS and GDP implemented days from the GDP only days.

  1. Towards Supervising Remote Dexterous Robots Across Time Delay

    NASA Technical Reports Server (NTRS)

    Hambuchen, Kimberly; Bluethmann, William; Goza, Michael; Ambrose, Robert; Wheeler, Kevin; Rabe, Ken

    2006-01-01

    The President s Vision for Space Exploration, laid out in 2004, relies heavily upon robotic exploration of the lunar surface in early phases of the program. Prior to the arrival of astronauts on the lunar surface, these robots will be required to be controlled across space and time, posing a considerable challenge for traditional telepresence techniques. Because time delays will be measured in seconds, not minutes as is the case for Mars Exploration, uploading the plan for a day seems excessive. An approach for controlling dexterous robots under intermediate time delay is presented, in which software running within a ground control cockpit predicts the intention of an immersed robot supervisor, then the remote robot autonomously executes the supervisor s intended tasks. Initial results are presented.

  2. Large File Transfers from Space Using Multiple Ground Terminals and Delay-Tolerant Networking

    NASA Technical Reports Server (NTRS)

    Ivancic, William D.; Paulsen, Phillip; Stewart, Dave; Eddy, Wesley; McKim, James; Taylor, John; Lynch, Scott; Heberle, Jay; Northam, James; Jackson, Chris; hide

    2010-01-01

    We use Delay-Tolerant Networking (DTN) to break control loops between space-ground communication links and ground-ground communication links to increase overall file delivery efficiency, as well as to enable large files to be proactively fragmented and received across multiple ground stations. DTN proactive fragmentation and reactive fragmentation were demonstrated from the UK-DMC satellite using two independent ground stations. The files were reassembled at a bundle agent, located at Glenn Research Center in Cleveland Ohio. The first space-based demonstration of this occurred on September 30 and October 1, 2009. This paper details those experiments. Communication, delay-tolerant networking, DTN, satellite, Internet, protocols, bundle, IP, TCP.

  3. The First Development of Human Factors Engineering Requirements for Application to Ground Task Design for a NASA Flight Program

    NASA Technical Reports Server (NTRS)

    Dischinger, H. Charles, Jr.; Stambolian, Damon B.; Miller, Darcy H.

    2008-01-01

    The National Aeronautics and Space Administration has long applied standards-derived human engineering requirements to the development of hardware and software for use by astronauts while in flight. The most important source of these requirements has been NASA-STD-3000. While there have been several ground systems human engineering requirements documents, none has been applicable to the flight system as handled at NASA's launch facility at Kennedy Space Center. At the time of the development of previous human launch systems, there were other considerations that were deemed more important than developing worksites for ground crews; e.g., hardware development schedule and vehicle performance. However, experience with these systems has shown that failure to design for ground tasks has resulted in launch schedule delays, ground operations that are more costly than they might be, and threats to flight safety. As the Agency begins the development of new systems to return humans to the moon, the new Constellation Program is addressing this issue with a new set of human engineering requirements. Among these requirements is a subset that will apply to the design of the flight components and that is intended to assure ground crew success in vehicle assembly and maintenance tasks. These requirements address worksite design for usability and for ground crew safety.

  4. WTAQ: A Computer Program for Calculating Drawdowns and Estimating Hydraulic Properties for Confined and Water-Table Aquifers

    USGS Publications Warehouse

    Barlow, Paul M.; Moench, Allen F.

    1999-01-01

    The computer program WTAQ calculates hydraulic-head drawdowns in a confined or water-table aquifer that result from pumping at a well of finite or infinitesimal diameter. The program is based on an analytical model of axial-symmetric ground-water flow in a homogeneous and anisotropic aquifer. The program allows for well-bore storage and well-bore skin at the pumped well and for delayed drawdown response at an observation well; by including these factors, it is possible to accurately evaluate the specific storage of a water-table aquifer from early-time drawdown data in observation wells and piezometers. For water-table aquifers, the program allows for either delayed or instantaneous drainage from the unsaturated zone. WTAQ calculates dimensionless or dimensional theoretical drawdowns that can be used with measured drawdowns at observation points to estimate the hydraulic properties of confined and water-table aquifers. Three sample problems illustrate use of WTAQ for estimating horizontal and vertical hydraulic conductivity, specific storage, and specific yield of a water-table aquifer by type-curve methods and by an automatic parameter-estimation method.

  5. Figure/ground segregation from temporal delay is best at high spatial frequencies.

    PubMed

    Kojima, H

    1998-12-01

    Two experiments investigated the role of spatial frequency in performance of a figure/ground segregation task based on temporal cues. Figure orientation was much easier to judge when figure and ground portions of the target were defined exclusively by random texture composed entirely of high spatial frequencies. When target components were defined by low spatial frequencies only, the task was nearly impossible except with long temporal delay between figure and ground. These results are inconsistent with the hypothesis that M-cell activity is primarily responsible for figure/ground segregation from temporal delay. Instead, these results point to a distinction between temporal integration and temporal differentiation. Additionally, the present results can be related to recent work on the binding of spatial features over time.

  6. A Saturn launched X-ray astronomy experiment. Volume 1: S-027

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The S-027 X-Ray Astronomy Experiment originally proposed in early 1966, was developed to detect X-rays in the 2 keV to 10 keV range. Both a prototype unit and flight unit were constructed with the prototype unit also serving as the engineering model, the qualification test unit, and after refurbishment, as the back-up flight unit. Two Ground Support Equipment consoles were built to verify the experiment operation. A photograph of one experiment package with its Ground Support Equipment is shown. The S-027 experiment was scheduled for launch in 1968/69 and although both units were completed and tested to the extent that either would be ready for the scheduled launch, delays in the space program resulted in a launch date slip of several years. When the 1968/69 launch delay became official, provisions were made for storage of the two experiment packages at SCI Electronics in Huntsville, Alabama until a new launch date could be established.

  7. Rocket engine exhaust plume diagnostics and health monitoring/management during ground testing

    NASA Technical Reports Server (NTRS)

    Chenevert, D. J.; Meeks, G. R.; Woods, E. G.; Huseonica, H. F.

    1992-01-01

    The current status of a rocket exhaust plume diagnostics program sponsored by NASA is reviewed. The near-term objective of the program is to enhance test operation efficiency and to provide for safe cutoff of rocket engines prior to incipient failure, thereby avoiding the destruction of the engine and the test complex and preventing delays in the national space program. NASA programs that will benefit from the nonintrusive remote sensed rocket plume diagnostics and related vehicle health management and nonintrusive measurement program are Space Shuttle Main Engine, National Launch System, National Aero-Space Plane, Space Exploration Initiative, Advanced Solid Rocket Motor, and Space Station Freedom. The role of emission spectrometry and other types of remote sensing in rocket plume diagnostics is discussed.

  8. Characterization of Days Based On Analysis of National Airspace System Performance Metrics

    NASA Technical Reports Server (NTRS)

    Chatterji, Gano B.; Musaffar, Bassam; Meyn, Larry A.; Quon, Leighton K.

    2006-01-01

    Days of operations in the National Airspace System can be described in term of traffic demand, runway conditions, equipment outages, and surface and enroute weather conditions. These causes manifest themselves in terms of departure delays, arrival delays, enroute delays and traffic flow management delays, Traffic flow management initiatives such as, ground stops, ground delay programs, miles-in-trail restrictions, rerouting and airborne holding are imposed to balance the air traffic demand with respect to the available capacity, In order to maintain operational efficiency of the National Airspace System, the Federal Aviation Administration (FAA) maintains delay sad other statistics in the Air Traffic Operations Network (OPSNET) and the Aviation System Performance Metrics (ASPM) databases. OPSNET data includes reportable delays of fifteen minutes ox more experienced by Instrument Flight Rule (IFR) flights. Numbers of aircraft affected by departure delays, enroute delays, arrival delays and traffic flow delays are recorded in the OPSNET data. ASPM data consist of number of actual departures, number of canceled departures, percentage of on time departures, percentage of on time gate arrivals, taxi-out delays. taxi-in delays, gate delays, arrival delays and block delays. Surface conditions at the major U.S. airports are classified in terms of Instrument Meteorological Condition (IMC) and Visual Meteorological Condition (VMC) as a function of the time of the day in the ASPM data. The main objective of this paper is to use OPSNET and ASPM data to classify the days in the datasets into few distinct groups, where each group is separated from the other groups in terms of a distance metric. The motivations for classifying the days are two-fold, 1) to enable selection of days of traffic with particular operational characteristics for concept evaluation using system-wide simulation systems such as the National Aeronautics and Space Administration's Airspace Concepts Evaluation Tool (ACES) and 2) to enable evaluation of a given day with respect to the characteristics of the classified groups. The first part of the paper is devoted to the analysis of major trends seen in the OPSNET and ASPM data. The second part of the paper is devoted to describing features or measures derived from the OPSNET and ASPM data that are suitable for characterizing days, and the classification algorithm used for grouping the days. Finally, the method for evaluating the characteristics of a given day with respect to the properties of the groups is described.

  9. Purely temporal figure-ground segregation.

    PubMed

    Kandil, F I; Fahle, M

    2001-05-01

    Visual figure-ground segregation is achieved by exploiting differences in features such as luminance, colour, motion or presentation time between a figure and its surround. Here we determine the shortest delay times required for figure-ground segregation based on purely temporal features. Previous studies usually employed stimulus onset asynchronies between figure- and ground-containing possible artefacts based on apparent motion cues or on luminance differences. Our stimuli systematically avoid these artefacts by constantly showing 20 x 20 'colons' that flip by 90 degrees around their midpoints at constant time intervals. Colons constituting the background flip in-phase whereas those constituting the target flip with a phase delay. We tested the impact of frequency modulation and phase reduction on target detection. Younger subjects performed well above chance even at temporal delays as short as 13 ms, whilst older subjects required up to three times longer delays in some conditions. Figure-ground segregation can rely on purely temporal delays down to around 10 ms even in the absence of luminance and motion artefacts, indicating a temporal precision of cortical information processing almost an order of magnitude lower than the one required for some models of feature binding in the visual cortex [e.g. Singer, W. (1999), Curr. Opin. Neurobiol., 9, 189-194]. Hence, in our experiment, observers are unable to use temporal stimulus features with the precision required for these models.

  10. Informed Grounded Theory

    ERIC Educational Resources Information Center

    Thornberg, Robert

    2012-01-01

    There is a widespread idea that in grounded theory (GT) research, the researcher has to delay the literature review until the end of the analysis to avoid contamination--a dictum that might turn educational researchers away from GT. Nevertheless, in this article the author (a) problematizes the dictum of delaying a literature review in classic…

  11. Basic research for the geodynamics program

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The mathematical models of space very long base interferometry (VLBI) observables suitable for least squares covariance analysis were derived and estimatability problems inherent in the space VLBI system were explored, including a detailed rank defect analysis and sensitivity analysis. An important aim is to carry out a comparative analysis of the mathematical models of the ground-based VLBI and space VLBI observables in order to describe the background in detail. Computer programs were developed in order to check the relations, assess errors, and analyze sensitivity. In order to investigate the estimatability of different geodetic and geodynamic parameters from the space VLBI observables, the mathematical models for time delay and time delay rate observables of space VLBI were analytically derived along with the partial derivatives with respect to the parameters. Rank defect analysis was carried out both by analytical and numerical testing of linear dependencies between the columns of the normal matrix thus formed. Definite conclusions were formed about the rank defects in the system.

  12. Analyzing Double Delays at Newark Liberty International Airport

    NASA Technical Reports Server (NTRS)

    Evans, Antony D.; Lee, Paul

    2016-01-01

    When weather or congestion impacts the National Airspace System, multiple different Traffic Management Initiatives can be implemented, sometimes with unintended consequences. One particular inefficiency that is commonly identified is in the interaction between Ground Delay Programs (GDPs) and time based metering of internal departures, or TMA scheduling. Internal departures under TMA scheduling can take large GDP delays, followed by large TMA scheduling delays, because they cannot be easily fitted into the overhead stream. In this paper we examine the causes of these double delays through an analysis of arrival operations at Newark Liberty International Airport (EWR) from June to August 2010. Depending on how the double delay is defined between 0.3 percent and 0.8 percent of arrivals at EWR experienced double delays in this period. However, this represents between 21 percent and 62 percent of all internal departures in GDP and TMA scheduling. A deep dive into the data reveals that two causes of high internal departure scheduling delays are upstream flights making up time between their estimated departure clearance times (EDCTs) and entry into time based metering, which undermines the sequencing and spacing underlying the flight EDCTs, and high demand on TMA, when TMA airborne metering delays are high. Data mining methods (currently) including logistic regression, support vector machines and K-nearest neighbors are used to predict the occurrence of double delays and high internal departure scheduling delays with accuracies up to 0.68. So far, key indicators of double delay and high internal departure scheduling delay are TMA virtual runway queue size, and the degree to which estimated runway demand based on TMA estimated times of arrival has changed relative to the estimated runway demand based on EDCTs. However, more analysis is needed to confirm this.

  13. Analysis and correction of ground reflection effects in measured narrowband sound spectra using cepstral techniques

    NASA Technical Reports Server (NTRS)

    Miles, J. H.; Stevens, G. H.; Leininger, G. G.

    1975-01-01

    Ground reflections generate undesirable effects on acoustic measurements such as those conducted outdoors for jet noise research, aircraft certification, and motor vehicle regulation. Cepstral techniques developed in speech processing are adapted to identify echo delay time and to correct for ground reflection effects. A sample result is presented using an actual narrowband sound pressure level spectrum. The technique can readily be adapted to existing fast Fourier transform type spectrum measurement instrumentation to provide field measurements/of echo time delays.

  14. Lightning-Related Indicators for National Climate Assessment (NCA) Studies

    NASA Technical Reports Server (NTRS)

    Koshak, W.

    2017-01-01

    Changes in climate can affect the characteristics of lightning (e.g., number of flashes that occur in a region, return stroke current and multiplicity, polarity of charge deposited to ground, and the lightning cloud-top optical energy emission). The NASA/MSFC Lightning Analysis Tool (LAT) monitors these and other quantities in support of the National Climate Assessment (NCA) program. Changes in lightning characteristics lead to changes in lightning-caused impacts to humans (e.g., fatalities, injuries, crop/property damage, wildfires, airport delays, changes in air quality).

  15. Development of a PC-based ground support system for a small satellite instrument

    NASA Astrophysics Data System (ADS)

    Deschambault, Robert L.; Gregory, Philip R.; Spenler, Stephen; Whalen, Brian A.

    1993-11-01

    The importance of effective ground support for the remote control and data retrieval of a satellite instrument cannot be understated. Problems with ground support may include the need to base personnel at a ground tracking station for extended periods, and the delay between the instrument observation and the processing of the data by the science team. Flexible solutions to such problems in the case of small satellite systems are provided by using low-cost, powerful personal computers and off-the-shelf software for data acquisition and processing, and by using Internet as a communication pathway to enable scientists to view and manipulate satellite data in real time at any ground location. The personal computer based ground support system is illustrated for the case of the cold plasma analyzer flown on the Freja satellite. Commercial software was used as building blocks for writing the ground support equipment software. Several levels of hardware support, including unit tests and development, functional tests, and integration were provided by portable and desktop personal computers. Satellite stations in Saskatchewan and Sweden were linked to the science team via phone lines and Internet, which provided remote control through a central point. These successful strategies will be used on future small satellite space programs.

  16. Improving the Accuracy of a Heliocentric Potential (HCP) Prediction Model for the Aviation Radiation Dose

    NASA Astrophysics Data System (ADS)

    Hwang, Junga; Yoon, Kyoung-Won; Jo, Gyeongbok; Noh, Sung-Jun

    2016-12-01

    The space radiation dose over air routes including polar routes should be carefully considered, especially when space weather shows sudden disturbances such as coronal mass ejections (CMEs), flares, and accompanying solar energetic particle events. We recently established a heliocentric potential (HCP) prediction model for real-time operation of the CARI-6 and CARI-6M programs. Specifically, the HCP value is used as a critical input value in the CARI-6/6M programs, which estimate the aviation route dose based on the effective dose rate. The CARI-6/6M approach is the most widely used technique, and the programs can be obtained from the U.S. Federal Aviation Administration (FAA). However, HCP values are given at a one month delay on the FAA official webpage, which makes it difficult to obtain real-time information on the aviation route dose. In order to overcome this critical limitation regarding the time delay for space weather customers, we developed a HCP prediction model based on sunspot number variations (Hwang et al. 2015). In this paper, we focus on improvements to our HCP prediction model and update it with neutron monitoring data. We found that the most accurate method to derive the HCP value involves (1) real-time daily sunspot assessments, (2) predictions of the daily HCP by our prediction algorithm, and (3) calculations of the resultant daily effective dose rate. Additionally, we also derived the HCP prediction algorithm in this paper by using ground neutron counts. With the compensation stemming from the use of ground neutron count data, the newly developed HCP prediction model was improved.

  17. Hopelessness as a basis for tuberculosis diagnostic delay in the Arkhangelsk region: a grounded theory study

    PubMed Central

    2013-01-01

    Background Data about delayed tuberculosis diagnosis in Northern Russia are scarce yet such knowledge could enhance the care of tuberculosis. The Arkhangelsk region is situated in the north of Russia, where the population is more than one million residents. The aim of the study was to understand factors influencing diagnostic delay among patients with tuberculosis in the Arkhangelsk region and to develop a theoretical model in order to explain diagnostic delay from the patients’ perspectives. Methods Twenty-three patients who had experienced diagnostic delay of tuberculosis were interviewed in Arkhangelsk. Using a qualitative approach, we conducted focus-group discussions for data gathering using Grounded Theory with the Paradigm Model to analyse the phenomenon of diagnostic delay. Results The study resulted in a theoretical model of the pathway of delay of tuberculosis diagnosis in the Arkhangelsk region in answer to the question: “Why and how do patients in the Arkhangelsk region delay tuberculosis diagnosis?” The model included categories of causal conditions, context and intervening conditions, action/interaction strategies, and consequences. The causal condition and main concern of the patients was that they were overpowered by hopelessness. Patients blamed policy, the administrative system, and doctors for their unfortunate life circumstances. This was accompanied by avoidance of health care, denial of their own health situations, and self-treatment. Only a deadly threat was a sufficient motivator for some patients to seek medical help. “Being overpowered by hopelessness” was identified as the core category that affected their self-esteem and influenced their entire lives, including family, work and social relations, and appeared even stronger in association with alcohol use. This category reflected the passive position of many patients in this situation, including their feelings of inability to change anything in their lives, to obtain employment, or to qualify for disability benefits. Conclusion The main contributing factor to unsuccessful health-seeking behaviour for patients with tuberculosis was identified as “being overpowered by hopelessness.” This should be taken into consideration when creating any preventive programs and diagnostic algorithms aimed at increasing knowledge about TB, improving the health system, decreasing alcohol consumption and reducing the poverty of the people in Arkhangelsk. PMID:23915339

  18. Maize (Zea mays) seeds can detect above-ground weeds; thiamethoxam alters the view.

    PubMed

    Afifi, Maha; Lee, Elizabeth; Lukens, Lewis; Swanton, Clarence

    2015-09-01

    Far red light is known to penetrate soil and delay seed germination. Thiamethoxam as a seed treatment has been observed to enhance seed germination. No previous work has explored the effect of thiamethoxam on the physiological response of buried maize seed when germinating in the presence of above-ground weeds. We hypothesised that the changes in red:far red reflected from above-ground weeds would be detected by maize seed phytochrome and delay seed germination by decreasing the level of GA and increasing ABA. We further hypothesised that thiamethoxam would overcome this delay in germination. Thiamethoxam enhanced seed germination in the presence of above-ground weeds by increasing GA signalling and downregulating DELLA protein and ABA signalling genes. An increase in amylase activity and a degradation of starch were also observed. Far red reflected from the above-ground weeds was capable of penetrating below the soil surface and was detected by maize seed phytochrome. Thiamethoxam altered the effect of far red on seed germination by stimulating GA and inhibiting ABA synthesis. This is the first study to suggest that the mode of action of thiamethoxam involves both GA synthesis and ABA inhibition. © 2014 Society of Chemical Industry.

  19. Integrated Demand Management: Minimizing Unanticipated Excessive Departure Delay while Ensuring Fairness from a Traffic Management Initiative

    NASA Technical Reports Server (NTRS)

    Yoo, Hyo-Sang; Brasil, Connie; Buckley, Nathan; Mohlenbrink, Christoph; Speridakos, Constantine; Parke, Bonny; Hodell, Gita; Lee, Paul U.; Smith, Nancy M.

    2017-01-01

    This paper introduces NASA's Integrated Demand Management (IDM) concept and presents the results from an early proof-of-concept evaluation and an exploratory experiment. An initial development of the concept was focused on integrating two systems - i.e. the FAA's newly deployed Traffic Flow Management System (TFMS) tool called the Collaborative Trajectory Options Program (CTOP) and the Time-Based Flow Management (TBFM) system with Extended Metering (XM) capabilities to manage projected heavy traffic demand into a capacity-constrained airport. A human-in-the-loop (HITL) simulation experiment was conducted to demonstrate the feasibility of the initial development of the concept by adapting it to an arrival traffic problem at Newark Liberty International Airport (EWR) during clear weather conditions. In this study, the CTOP was utilized to strategically plan the arrival traffic demand by controlling take-off times of both short- and long-haul flights (long-hauls specify aircraft outside TBFM regions and short-hauls specify aircraft within TBFM regions) in a way that results in equitable delays among the groups. Such strategic planning allows less airborne delay to occur within TBFM by feeding manageable long-haul traffic demand while reserving sufficient slots in the overhead streams for the short-haul departures. The manageable traffic demand indicates the TBFM scheduler assigns no more airborne delay than its assigned airspace is capable of absorbing. TBFM then uses its time-based metering capabilities to deliver the desirable throughput by tactically rescheduling the TBFM entered long-haul flights and short-haul departures. Additional research was also performed to explore use of Required Time of Arrival (RTA) capabilities as a potential control mechanism for the airborne flights to improve arrival traffic delivery accuracy of scheduled long-haul traffic demand. The study results show that both short- and long-haul flights received similar ground delays. In addition, there was a noticeable reduction in the total amount of excessive unanticipated last-minute ground delays, i.e. delays that are frequently imposed on the short-haul flight in current day operations due to saturation in the overhead stream, commonly referred to as 'double penalty'. Furthermore, the concept achieved the target throughput while minimizing the expected cost associated with overall delays in arrival traffic. Assessment of the RTA capabilities showed that there was indeed improvement of the scheduled entry times into TBFM regions by using RTA capabilities. However, with respect to reduction in delays incurred within TBFM, there was no observable benefit of improving the precision of long-haul flights entry times.

  20. Satellite Contamination and Materials Outgassing Knowledgebase - An Interactive Database Reference

    NASA Technical Reports Server (NTRS)

    Green, D. B.; Burns, Dewitt (Technical Monitor)

    2001-01-01

    The goal of this program is to collect at one site much of the knowledge accumulated about the outgassing properties of aerospace materials based on ground testing, the effects of this outgassing observed on spacecraft in flight, and the broader contamination environment measured by instruments on-orbit. We believe that this Web site will help move contamination a step forward, away from anecdotal folklore toward engineering discipline. Our hope is that once operational, this site will form a nucleus for information exchange, that users will not only take information from our knowledge base, but also provide new information from ground testing and space missions, expanding and increasing the value of this site to all. We urge Government and industry users to endorse this approach that will reduce redundant testing, reduce unnecessary delays, permit uniform comparisons, and permit informed decisions.

  1. A collection of articles on S/X-band experiment zero delay ranging tests, volume 1

    NASA Technical Reports Server (NTRS)

    Otoshi, T. Y. (Editor)

    1975-01-01

    Articles are presented which are concerned with the development of special test equipment and a dual-frequency zero delay device (ZDD) that were required for range tests and the measurement of ground station delays for the Mariner-Venus-Mercury 1973 S/X-band experiment. Test data obtained at DSS 14 after installation of the ZDD on the 64-m antenna are given. It is shown that large variations of range were observed as a function of antenna elevation angle and were sensitive to antenna location. A ranging calibration configuration that was subsequently developed and a technique for determining the appropriate Z-correction are described. Zero delay test data at DSS 14 during the Mariner 10 Venus-Mercury-Encounter periods (1974 days 12-150) are presented. The theoretical analysis and experimental verifications are included of the effects of multipath and effects of discontinuities on range delay measurements. A movable subreflector technique and the multipath theory were used to isolate principal multipath errors on the 64-m antenna and to enable a more accurate determination of the actual ground station range delay.

  2. 75 FR 41920 - Agency Information Collection; Activity Under OMB Review; Airline Service Quality Performance...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-19

    ... and analyze air traffic delays. Wheels-up and wheels-down times are used in conjunction with departure and arrival times to show the extent of ground delays. Actual elapsed flight time, wheels-down minus wheels- up time, is compared to scheduled elapsed flight time to identify airborne delays. The reporting...

  3. Parts Quality Management: Direct Part Marking via Data Matrix Symbols for Mission Assurance

    NASA Technical Reports Server (NTRS)

    Moss, Chantrice

    2013-01-01

    A United States Government Accountability Office (GAO) review of twelve NASA programs found widespread parts quality problems contributing to significant cost overruns, schedule delays, and reduced system reliability. Direct part-marking with Data Matrix symbols could significantly improve the quality of inventory control and parts lifecycle management. This paper examines the feasibility of using 15 marking technologies for use in future NASA programs. A structural analysis is based on marked material type, operational environment (e.g., ground, suborbital, orbital), durability of marks, ease of operation, reliability, and affordability. A cost-benefits analysis considers marking technology (data plates, label printing, direct part marking) and marking types (two-dimensional machine-readable, human-readable). Previous NASA parts marking efforts and historical cost data are accounted for, including in-house vs. outsourced marking. Some marking methods are still under development. While this paper focuses on NASA programs, results may be applicable to a variety of industrial environments.

  4. To catch a child's imagination 2: Educational update on CAN-DO

    NASA Technical Reports Server (NTRS)

    Nicholson, James H.

    1987-01-01

    At the G.A.S. Symposium last year, the Charleston County Public School CAN DO Project outlined an ambitious educational program revolving around the photography of Comet Halley from the Shuttle using a GAS canister. The target flight was STS 61-E scheduled for a March, 1986, launch. Such strict time constraints and highly specific mission requirements made the CAN DO program even more risky than normal. In spite of this, almost all of the planned educational goals were achieved, even after the postponement of all Shuttle activities in January of 1986. This follow-up paper summarizes the effects of events on the program as proposed and the attempts to carry out as many of the activities as possible. It is hoped that this paper will suggest constructive ways in which to cope with the delays and mishaps that are the invariable lot of pioneers who break new ground and attempt the new and untried.

  5. Neutron induced radio-isotopes and background for Ge double beta decay experiments

    NASA Astrophysics Data System (ADS)

    Chu, Pinghan; Majorana Collaboration

    2015-10-01

    Environmental neutrons, mostly produced by muons in the cosmic rays, might contribute backgrounds to the search for neutrinoless double beta decays. These neutrons can interact with materials and generate radio-isotopes, which can decay and produce radioactive backgrounds. Some of these neutron-induced isotopes have a signature of a time-delayed coincidence, allowing us to study these infrequent events. For example, such isotopes can decay by beta decay to metastable states and then decay by gamma decay to the ground state. Considering the time-delayed coincidence of these two processes, we can determine candidates for these neutron-induced isotopes in the data and estimate the flux of neutrons in the deep underground environment. In this report, we will list possible neutron-induced isotopes and the methodology to detect them, especially those that can affect the search for neutrinoless double beta decays in 76Ge. This material is based upon work supported by the U.S. Department of Energy, Office of Science, Office of Nuclear Physics, the Particle Astrophysics Program of the National Science Foundation, and the Sanford Underground Research Facility. We acknowledge the support of the U.S. Department of Energy through the LANL/LDRD Program.

  6. Measurements of copper ground-state and metastable level population densities in a copper-chloride laser

    NASA Technical Reports Server (NTRS)

    Nerheim, N. M.

    1977-01-01

    The population densities of both the ground and the 2D(5/2) metastable states of copper atoms in a double-pulsed copper-chloride laser are correlated with laser energy as a function of time after the dissociation current pulse. Time-resolved density variations of the ground and excited copper atoms were derived from measurements of optical absorption at 324.7 and 510.6 nm, respectively, over a wide range of operating conditions in laser tubes with diameters of 4 to 40 mm. The minimum delay between the two current pulses at which lasing was observed is shown to be a function of the initial density and subsequent decay of the metastable state. Similarly, the maximum delay is shown to be a function of the initial density and decay of the ground state.

  7. System architecture for asynchronous multi-processor robotic control system

    NASA Technical Reports Server (NTRS)

    Steele, Robert D.; Long, Mark; Backes, Paul

    1993-01-01

    The architecture for the Modular Telerobot Task Execution System (MOTES) as implemented in the Supervisory Telerobotics (STELER) Laboratory is described. MOTES is the software component of the remote site of a local-remote telerobotic system which is being developed for NASA for space applications, in particular Space Station Freedom applications. The system is being developed to provide control and supervised autonomous control to support both space based operation and ground-remote control with time delay. The local-remote architecture places task planning responsibilities at the local site and task execution responsibilities at the remote site. This separation allows the remote site to be designed to optimize task execution capability within a limited computational environment such as is expected in flight systems. The local site task planning system could be placed on the ground where few computational limitations are expected. MOTES is written in the Ada programming language for a multiprocessor environment.

  8. Examination of Communication Delays on Team Performance: Utilizing the International Space Station (ISS) as a Test Bed for Analog Research

    NASA Technical Reports Server (NTRS)

    Keeton, K. E.; Slack, K, J.; Schmidt, L. L.; Ploutz-Snyder, R.; Baskin, P.; Leveton, L. B.

    2011-01-01

    Operational conjectures about space exploration missions of the future indicate that space crews will need to be more autonomous from mission control and operate independently. This is in part due to the expectation that communication quality between the ground and exploration crews will be more limited and delayed. Because of potential adverse effects on communication quality, both researchers and operational training and engineering experts have suggested that communication delays and the impact these delays have on the quality of communications to the crew will create performance decrements if crews are not given adequate training and tools to support more autonomous operations. This presentation will provide an overview of a research study led by the Behavioral Health and Performance Element (BHP) of the NASA Human Research Program that examines the impact of implementing a communication delay on ISS on individual and team factors and outcomes, including performance and related perceptions of autonomy. The methodological design, data collection efforts, and initial results of this study to date will be discussed . The results will focus on completed missions, DRATS and NEEMO15. Lessons learned from implementing this study within analog environments will also be discussed. One lesson learned is that the complexities of garnishing a successful data collection campaign from these high fidelity analogs requires perseverance and a strong relationship with operational experts. Results of this study will provide a preliminary understanding of the impact of communication delays on individual and team performance as well as an insight into how teams perform and interact in a space-like environment . This will help prepare for implementation of communication delay tests on the ISS, targeted for Increment 35/36.

  9. Ice sheet margins and ice shelves

    NASA Technical Reports Server (NTRS)

    Thomas, R. H.

    1984-01-01

    The effect of climate warming on the size of ice sheet margins in polar regions is considered. Particular attention is given to the possibility of a rapid response to warming on the order of tens to hundreds of years. It is found that the early response of the polar regions to climate warming would be an increase in the area of summer melt on the ice sheets and ice shelves. For sufficiently large warming (5-10C) the delayed effects would include the breakup of the ice shelves by an increase in ice drainage rates, particularly from the ice sheets. On the basis of published data for periodic changes in the thickness and melting rates of the marine ice sheets and fjord glaciers in Greenland and Antarctica, it is shown that the rate of retreat (or advance) of an ice sheet is primarily determined by: bedrock topography; the basal conditions of the grounded ice sheet; and the ice shelf condition downstream of the grounding line. A program of satellite and ground measurements to monitor the state of ice sheet equilibrium is recommended.

  10. Autonomous Mission Operations Roadmap

    NASA Technical Reports Server (NTRS)

    Frank, Jeremy David

    2014-01-01

    As light time delays increase, the number of such situations in which crew autonomy is the best way to conduct the mission is expected to increase. However, there are significant open questions regarding which functions to allocate to ground and crew as the time delays increase. In situations where the ideal solution is to allocate responsibility to the crew and the vehicle, a second question arises: should the activity be the responsibility of the crew or an automated vehicle function? More specifically, we must answer the following questions: What aspects of mission operation responsibilities (Plan, Train, Fly) should be allocated to ground based or vehicle based planning, monitoring, and control in the presence of significant light-time delay between the vehicle and the Earth?How should the allocated ground based planning, monitoring, and control be distributed across the flight control team and ground system automation? How should the allocated vehicle based planning, monitoring, and control be distributed between the flight crew and onboard system automation?When during the mission should responsibility shift from flight control team to crew or from crew to vehicle, and what should the process of shifting responsibility be as the mission progresses? NASA is developing a roadmap of capabilities for Autonomous Mission Operations for human spaceflight. This presentation will describe the current state of development of this roadmap, with specific attention to in-space inspection tasks that crews might perform with minimum assistance from the ground.

  11. Ground controlled robotic assembly operations for Space Station Freedom

    NASA Technical Reports Server (NTRS)

    Parrish, Joseph C.

    1991-01-01

    A number of dextrous robotic systems and associated positioning and transportation devices are available on Space Station Freedom (SSF) to perform assembly tasks that would otherwise need to be performed by extravehicular activity (EVA) crewmembers. The currently planned operating mode for these robotic systems during the assembly phase is teleoperation by intravehicular activity (IVA) crewmembers. While this operating mode is less hazardous and expensive than manned EVA operations, and has insignificant control loop time delays, the amount of IVA time available to support telerobotic operations is much less than the anticipated requirements. Some alternative is needed to allow the robotic systems to perform useful tasks without exhausting the available IVA resources; ground control is one such alternative. The issues associated with ground control of SSF robotic systems to alleviate onboard crew time availability constraints are investigated. Key technical issues include the effect of communication time delays, the need for safe, reliable execution of remote operations, and required modifications to the SSF ground and flight system architecture. Time delay compensation techniques such as predictive displays and world model-based force reflection are addressed and collision detection and avoidance strategies to ensure the safety of the on-orbit crew, Orbiter, and SSF are described. Although more time consuming and difficult than IVA controlled teleoperations or manned EVA, ground controlled telerobotic operations offer significant benefits during the SSF assembly phase, and should be considered in assembly planning activities.

  12. Avoidant conversations about death by clinicians cause delays in reporting of neutropenic sepsis: Grounded theory study.

    PubMed

    Oakley, Catherine; Taylor, Cath; Ream, Emma; Metcalfe, Alison

    2017-10-01

    Evidence suggests that patients delay reporting symptoms of neutropenic sepsis (NS) despite the risk to their life. This study aimed to elicit factors that contribute to delayed patient reporting of NS symptoms. A constructivist grounded theory study used observations of chemotherapy consultations (13 h) and 31 in-depth interviews to explore beliefs, experiences, and behaviors related to NS. Participants included women with breast cancer, their carers (partners, family, or friends), and clinicians. An explanation for patient delays was developed through theoretical sampling of participants to explore emerging areas of interest and through constant comparison of data and their coding. This entailed iterative and concurrent data collection and analysis. Data were collected until saturation. All patients who developed NS-type symptoms delayed presenting to hospital (2.5 h-8 days), sometimes repeatedly. Moderators of delay included metastatic disease, bereavement, fatalism, religious beliefs, and quality of relationships with clinicians. There was an interplay of behaviors between clinicians, patients, and carers where they subconsciously conspired to underplay the seriousness and possibility of NS occurring. Findings have implications for health risk communication and development of holistic service models. Copyright © 2016 John Wiley & Sons, Ltd.

  13. PRECISION TIME-DELAY CIRCUIT

    DOEpatents

    Creveling, R.

    1959-03-17

    A tine-delay circuit which produces a delay time in d. The circuit a capacitor, an te back resistance, connected serially with the anode of the diode going to ground. At the start of the time delay a negative stepfunction is applied to the series circuit and initiates a half-cycle transient oscillatory voltage terminated by a transient oscillatory voltage of substantially higher frequency. The output of the delay circuit is taken at the junction of the inductor and diode where a sudden voltage rise appears after the initiation of the higher frequency transient oscillations.

  14. Joint NASA/USAF Airborne Field Mill Program - Operation and safety considerations during flights of a Lear 28 airplane in adverse weather

    NASA Technical Reports Server (NTRS)

    Fisher, Bruce D.; Phillips, Michael R.; Maier, Launa M.

    1992-01-01

    A NASA Langley Research Center Learjet 28 research airplane was flown in various adverse weather conditions in the vicinity of the NASA Kennedy Space Center from 1990-1992 to measure airborne electric fields during the Joint NASA/USAF Airborne Field Mill Program. The objective of this program was to characterize the electrical activity in various weather phenomena common to the NASA-Kennedy area in order to refine Launch Commit Criteria for natural and triggered lightning. The purpose of the program was to safely relax the existing launch commit criteria, thereby increasing launch availability and reducing the chance for weather holds and delays. This paper discusses the operational conduct of the flight test, including environmental/safety considerations, aircraft instrumentation and modification, test limitations, flight procedures, and the procedures and responsibilities of the personnel in the ground station. Airborne field mill data were collected for all the Launch Commit Criteria during two summer and two winter deployments. These data are now being analyzed.

  15. From Entry to Practice to Advanced Nurse Practitioner - The Progression of Competencies and How They Assist in Delivery of eHealth Programs for Healthy Ageing.

    PubMed

    Rodger, Daragh; Hussey, Pamela

    2017-01-01

    Most of the health issues encountered in persons of older age are the result of one or more chronic diseases. The evidence base reports that chronic diseases can be prevented or delayed by engaging in healthy behaviors. Education provides a cost effective intervention on both economic grounds in addition to delivery of optimal patient outcomes. Information and Communication Technology (ICT) increasingly is viewed as a critical utility in eHealth delivery, providing scope for expanding online education facilities for older persons. Developing nursing competencies in the delivery of eHealth solutions to deliver user education programs therefore makes sense. This chapter discusses nursing competencies on the development of targeted eHealth programs for healthy ageing. The role of Advanced Nurse Practitioner in Ireland and its associated competency set identifies how a strong action learning model can be designed to deliver eHealth educational programs for effective delivery of healthy ageing in place.

  16. Neuroeconomics and the study of addiction.

    PubMed

    Monterosso, John; Piray, Payam; Luo, Shan

    2012-07-15

    We review the key findings in the application of neuroeconomics to the study of addiction. Although there are not "bright line" boundaries between neuroeconomics and other areas of behavioral science, neuroeconomics coheres around the topic of the neural representations of "Value" (synonymous with the "decision utility" of behavioral economics). Neuroeconomics parameterizes distinct features of Valuation, going beyond the general construct of "reward sensitivity" widely used in addiction research. We argue that its modeling refinements might facilitate the identification of neural substrates that contribute to addiction. We highlight two areas of neuroeconomics that have been particularly productive. The first is research on neural correlates of delay discounting (reduced Valuation of rewards as a function of their delay). The second is work that models how Value is learned as a function of "prediction-error" signaling. Although both areas are part of the neuroeconomic program, delay discounting research grows directly out of behavioral economics, whereas prediction-error work is grounded in models of learning. We also consider efforts to apply neuroeconomics to the study of self-control and discuss challenges for this area. We argue that neuroeconomic work has the potential to generate breakthrough research in addiction science. Copyright © 2012 Society of Biological Psychiatry. Published by Elsevier Inc. All rights reserved.

  17. Phase and group delay of S-band megawatt Cassegrain diplexer and S-band megawatt transmit filter

    NASA Technical Reports Server (NTRS)

    Lay, R.

    1977-01-01

    The phase characteristics and group delay of the S-band Megawatt Cassegrain Diplexer (MCD) and S-band Megawatt Transmit Filter (MTF) are reported. These phase measurements on the MCD and MTF were done in response to the need to obtain the total DSS hardware ground delay required for very long baseline interferometry and ranging radio metric measurements.

  18. Pump-dump-probe and pump-repump-probe ultrafast spectroscopy resolves cross section of an early ground state intermediate and stimulated emission in the photoreactions of the Pr ground state of the cyanobacterial phytochrome Cph1.

    PubMed

    Fitzpatrick, Ann E; Lincoln, Craig N; van Wilderen, Luuk J G W; van Thor, Jasper J

    2012-01-26

    The primary photoreactions of the red absorbing ground state (Pr) of the cyanobacterial phytochrome Cph1 from Synechocystis PCC 6803 involve C15═C16 Z-E photoisomerization of its phycocyanobilin chromophore. The first observable product intermediate in pump-probe measurements of the photocycle, "Lumi-R", is formed with picosecond kinetics and involves excited state decay reactions that have 3 and 14 ps time constants. Here, we have studied the photochemical formation of the Lumi-R intermediate using multipulse picosecond visible spectroscopy. Pump-dump-probe (PDP) and pump-repump-probe (PRP) experiments were carried out by employing two femtosecond visible pulses with 1, 14, and 160 ps delays, together with a broadband dispersive visible probe. The time delays between the two excitation pulses have been selected to allow interaction with the dominant (3 and 14 ps) kinetic phases of Lumi-R formation. The frequency dependence of the PDP and PRP amplitudes was investigated at 620, 640, 660, and 680 nm, covering excited state absorption (λ(max) = 620 nm), ground state absorption (λ(max) = 660 nm), and stimulated emission (λ(max) = 680 nm) cross sections. Experimental double difference transient absorbance signals (ΔΔOD), from the PDP and PRP measurements, required corrections to remove contributions from ground state repumping. The sensitivity of the resulting ΔΔOD signals was systematically investigated for possible connectivity schemes and photochemical parameters. When applying a homogeneous (sequentially decaying) connectivity scheme in both the 3 and 14 ps kinetic phases, evidence for repumping of an intermediate that has an electronic ground state configuration (GSI) is taken from the dump-induced S1 formation with 620, 640, and 660 nm wavelengths and 1 and 14 ps repump delays. Evidence for repumping a GSI is also seen, for the same excitation wavelengths, when imposing a target connectivity scheme proposed in the literature for the 1 ps repump delay. In contrast, using a 680 nm dump pulse, ground state formation is observed for all models examined. The ΔΔOD signals were dominated by stimulated emission, at both 1 and 14 ps delays for the longer wavelength excitation. The GSI, which is revealed by the PRP measurements and not resolved from pump-probe measurements, is found to be directly formed from the excited state of Pr, and its formation is considered using heterogeneous, homogeneous, and target models to globally fit the data.

  19. Impact of Pilot Delay and Non-Responsiveness on the Safety Performance of Airborne Separation

    NASA Technical Reports Server (NTRS)

    Consiglio, Maria; Hoadley, Sherwood; Wing, David; Baxley, Brian; Allen, Bonnie Danette

    2008-01-01

    Assessing the safety effects of prediction errors and uncertainty on automationsupported functions in the Next Generation Air Transportation System concept of operations is of foremost importance, particularly safety critical functions such as separation that involve human decision-making. Both ground-based and airborne, the automation of separation functions must be designed to account for, and mitigate the impact of, information uncertainty and varying human response. This paper describes an experiment that addresses the potential impact of operator delay when interacting with separation support systems. In this study, we evaluated an airborne separation capability operated by a simulated pilot. The experimental runs are part of the Safety Performance of Airborne Separation (SPAS) experiment suite that examines the safety implications of prediction errors and system uncertainties on airborne separation assistance systems. Pilot actions required by the airborne separation automation to resolve traffic conflicts were delayed within a wide range, varying from five to 240 seconds while a percentage of randomly selected pilots were programmed to completely miss the conflict alerts and therefore take no action. Results indicate that the strategicAirborne Separation Assistance System (ASAS) functions exercised in the experiment can sustain pilot response delays of up to 90 seconds and more, depending on the traffic density. However, when pilots or operators fail to respond to conflict alerts the safety effects are substantial, particularly at higher traffic densities.

  20. Ground Tilt Time Delays between Kilauea Volcano's Summit and East Rift Zone Caused by Magma Reservoir Buffering

    NASA Astrophysics Data System (ADS)

    Haney, M. M.; Patrick, M. R.; Anderson, K. R.

    2016-12-01

    A cyclic pattern of ground deformation, called a deflation-inflation (DI) cycle, is commonly observed at Kilauea Volcano, Hawai`i. These cycles are an important part of Kilauea's eruptive activity because they directly influence the level of the summit lava lake as well as the effusion rate (and resulting lava flow hazard) at the East Rift Zone eruption site at Pu`u `O`o. DI events normally span several days, and are measured both at the summit and at Pu`u `O`o cone (20 km distance). Signals appear first at the summit and are then observed at Pu`u `O`o after an apparent delay of between 0.5 and 10 hours, which has been previously interpreted as reflecting magma transport time. We propose an alternate explanation, in which the apparent delay is an artifact of buffering by the small magma reservoir thought to exist at Pu`u `O`o. Simple Poiseuille flow modeling demonstrates that this apparent delay can be reproduced by the changing balance of inflow (from the summit) and outflow (to surface lava flows) at the Pu`u `O`o magma reservoir. The apparent delay is sensitive to the geometry of the conduit leaving Pu`u `O`o, feeding surface lava flows. We demonstrate how the reservoir buffering is quantitatively equivalent to a causal low-pass filter, which explains both the apparent delay as well as the smoothed, skewed nature of the signal at Pu`u `O`o relative to the summit. By comparing summit and Pu`u `O`o ground tilt signals over an extended time period, it may be possible to constrain the changing geometry of the shallow magmatic system through time.

  1. Supervisory autonomous local-remote control system design: Near-term and far-term applications

    NASA Technical Reports Server (NTRS)

    Zimmerman, Wayne; Backes, Paul

    1993-01-01

    The JPL Supervisory Telerobotics Laboratory (STELER) has developed a unique local-remote robot control architecture which enables management of intermittent bus latencies and communication delays such as those expected for ground-remote operation of Space Station robotic systems via the TDRSS communication platform. At the local site, the operator updates the work site world model using stereo video feedback and a model overlay/fitting algorithm which outputs the location and orientation of the object in free space. That information is relayed to the robot User Macro Interface (UMI) to enable programming of the robot control macros. The operator can then employ either manual teleoperation, shared control, or supervised autonomous control to manipulate the object under any degree of time-delay. The remote site performs the closed loop force/torque control, task monitoring, and reflex action. This paper describes the STELER local-remote robot control system, and further describes the near-term planned Space Station applications, along with potential far-term applications such as telescience, autonomous docking, and Lunar/Mars rovers.

  2. AGN Space Telescope and Optical Reverberation Mapping Project II. Ultraviolet and Optical Continuum Analysis

    NASA Astrophysics Data System (ADS)

    Fausnaugh, Michael; Agn Storm Team

    2015-01-01

    The AGN STORM collaboration recently completed an extensive reverberation mapping campaign, targeting NGC 5548 with observations spanning the hard X-rays to mid-infrared. This campaign represents a massive collaborative effort, with far UV continuum spectrophotometry obtained through an intensive HST COS program, and near-UV/optical broad band photometry obtained from Swift and over 25 ground-based telescopes (in BVR and griz). The campaign spanned the entire 2014 observing season with virtually daily cadence, which allows us to compare with unprecedented accuracy the detailed structure of the observed UV and optical continuum emission signals in this archetypal AGN. We find statistically significant time delays between lightcurves from different wavebands, and this result has implications for the temperature, ionization, and geometric configuration of the AGN's sub-parsec scale environment. We will present the UV/optical continuum lightcurves from this campaign, as well as an analysis of the wavelength-dependent structure of the time delays.

  3. Software Correlator for Radioastron Mission

    NASA Astrophysics Data System (ADS)

    Likhachev, Sergey F.; Kostenko, Vladimir I.; Girin, Igor A.; Andrianov, Andrey S.; Rudnitskiy, Alexey G.; Zharov, Vladimir E.

    In this paper, we discuss the characteristics and operation of Astro Space Center (ASC) software FX correlator that is an important component of space-ground interferometer for Radioastron project. This project performs joint observations of compact radio sources using 10m space radio telescope (SRT) together with ground radio telescopes at 92, 18, 6 and 1.3 cm wavelengths. In this paper, we describe the main features of space-ground VLBI data processing of Radioastron project using ASC correlator. Quality of implemented fringe search procedure provides positive results without significant losses in correlated amplitude. ASC Correlator has a computational power close to real time operation. The correlator has a number of processing modes: “Continuum”, “Spectral Line”, “Pulsars”, “Giant Pulses”,“Coherent”. Special attention is paid to peculiarities of Radioastron space-ground VLBI data processing. The algorithms of time delay and delay rate calculation are also discussed, which is a matter of principle for data correlation of space-ground interferometers. During five years of Radioastron SRT successful operation, ASC correlator showed high potential of satisfying steady growing needs of current and future ground and space VLBI science. Results of ASC software correlator operation are demonstrated.

  4. Russian Hydrogen-Checking Instrument on Curiosity Fires 2 Millionth Pulse

    NASA Image and Video Library

    2014-01-29

    Dynamic Albedo of Neutrons DAN, measures the flow of neutrons with different energy levels returning from the ground, and their delay times, as an indication of the amount and depth of hydrogen in the ground beneath the NASA rover, Curiosity.

  5. An Investigation of the Effects of the Time Lag due to Long Transmission Distances Upon Remote Control. Phase 1; Tracking Experiments

    NASA Technical Reports Server (NTRS)

    Adams, James L.

    1961-01-01

    A series of pursuit tracking tasks were performed incorporating a transport lag in the control loop. The target was a mixture of four sine waves, the fastest having a frequency of 16 cycles per minute at full speed. An attempt was made to design the experiments so that they would provide data applicable to remote control of a ground vehicle over long transmission distances. Three programs were run. In each the time lag was placed between the control and the display. In the first program a velocity control was used and the operator was told that his knob controlled a vehicle, the problem represented a road 9 and he was to drive his vehicle along the road 9 using the delayed vehicle position as feedback for whatever means he desired. The objective was not to match the display traces. In the second program a velocity control was used, and the operator was told that the problem trace represented a road and the delayed trace represented a vehicle and he was to keep them together. The objective was to match display traces. The third program was identical with the first, except that an acceleration control was used rather than a velocity control. Target speeds used were full speed, 1/2 speed, 1/4 speed, 1/8 speed, and 1/16 speed. Time lags were 1/4 second, l/2 second, 1 second, 1-1/2 second, 2 second, 3 second, and 6 seconds. The experimental results are presented in the last section of this report.

  6. 45 CFR 2105.3 - Action on initial requests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... sound grounds. (b) Determination will be dispatched within ten days, excluding Saturdays, Sundays, and... initial determination on requests may be delayed up to a total of ten additional days, excluding Saturdays, Sundays, and legal public holidays and notice of such delay shall be dispatched within the first ten days...

  7. Time-Delay Interferometry for Space-based Gravitational Wave Searches

    NASA Technical Reports Server (NTRS)

    Armstrong, J.; Estabrook, F.; Tinto, M.

    1999-01-01

    Ground-based, equal-arm-length laser interferometers are being built to measure high-frequency astrophysical graviatational waves. Because of the arm-length equality, laser light experiences the same delay in each arm and thus phase or frequency noise from the laser itself precisely cancels at the photodetector.

  8. The Building Blocks for JWST I and T (Integrations and Test) to Operations - From Simulator to Flight Units

    NASA Technical Reports Server (NTRS)

    Fatig, Curtis; Ochs, William; Johns, Alan; Seaton, Bonita; Adams, Cynthia; Wasiak, Francis; Jones, Ronald; Jackson, Wallace

    2012-01-01

    The James Webb Space Telescope (JWST) Project has an extended integration and test (I&T) phase due to long procurement and development times of various components as well as recent launch delays. The JWST Ground Segment and Operations group has developed a roadmap of the various ground and flight elements and their use in the various JWST I&T test programs. The JWST Project s building block approach to the eventual operational systems, while not new, is complex and challenging; a large-scale mission like JWST involves international partners, many vendors across the United States, and competing needs for the same systems. One of the challenges is resource balancing so simulators and flight products for various elements congeal into integrated systems used for I&T and flight operations activities. This building block approach to an incremental buildup provides for early problem identification with simulators and exercises the flight operations systems, products, and interfaces during the JWST I&T test programs. The JWST Project has completed some early I&T with the simulators, engineering models and some components of the operational ground system. The JWST Project is testing the various flight units as they are delivered and will continue to do so for the entire flight and operational system. The JWST Project has already and will continue to reap the value of the building block approach on the road to launch and flight operations.

  9. Parts quality management: Direct part marking of data matrix symbol for mission assurance

    NASA Astrophysics Data System (ADS)

    Moss, Chantrice; Chakrabarti, Suman; Scott, David W.

    A United States Government Accountability Office (GAO) review of twelve NASA programs found widespread parts quality problems contributing to significant cost overruns, schedule delays, and reduced system reliability. Direct part marking with Data Matrix symbols could significantly improve the quality of inventory control and parts lifecycle management. This paper examines the feasibility of using direct part marking technologies for use in future NASA programs. A structural analysis is based on marked material type, operational environment (e.g., ground, suborbital, Low Earth Orbit), durability of marks, ease of operation, reliability, and affordability. A cost-benefits analysis considers marking technology (label printing, data plates, and direct part marking) and marking types (two-dimensional machine-readable, human-readable). Previous NASA parts marking efforts and historical cost data are accounted for, including in-house vs. outsourced marking. Some marking methods are still under development. While this paper focuses on NASA programs, results may be applicable to a variety of industrial environments.

  10. Ad Hoc modeling, expert problem solving, and R&T program evaluation

    NASA Technical Reports Server (NTRS)

    Silverman, B. G.; Liebowitz, J.; Moustakis, V. S.

    1983-01-01

    A simplified cost and time (SCAT) analysis program utilizing personal-computer technology is presented and demonstrated in the case of the NASA-Goddard end-to-end data system. The difficulties encountered in implementing complex program-selection and evaluation models in the research and technology field are outlined. The prototype SCAT system described here is designed to allow user-friendly ad hoc modeling in real time and at low cost. A worksheet constructed on the computer screen displays the critical parameters and shows how each is affected when one is altered experimentally. In the NASA case, satellite data-output and control requirements, ground-facility data-handling capabilities, and project priorities are intricately interrelated. Scenario studies of the effects of spacecraft phaseout or new spacecraft on throughput and delay parameters are shown. The use of a network of personal computers for higher-level coordination of decision-making processes is suggested, as a complement or alternative to complex large-scale modeling.

  11. Parts Quality Management: Direct Part Marking of Data Matrix Symbol for Mission Assurance

    NASA Technical Reports Server (NTRS)

    Moss, Chantrice; Chakrabarti, Suman; Scott, David W.

    2013-01-01

    A United States Government Accountability Office (GAO) review of twelve NASA programs found widespread parts quality problems contributing to significant cost overruns, schedule delays, and reduced system reliability. Direct part marking with Data Matrix symbols could significantly improve the quality of inventory control and parts lifecycle management. This paper examines the feasibility of using direct part marking technologies for use in future NASA programs. A structural analysis is based on marked material type, operational environment (e.g., ground, suborbital, Low Earth Orbit), durability of marks, ease of operation, reliability, and affordability. A cost-benefits analysis considers marking technology (label printing, data plates, and direct part marking) and marking types (two-dimensional machine-readable, human-readable). Previous NASA parts marking efforts and historical cost data are accounted for, including inhouse vs. outsourced marking. Some marking methods are still under development. While this paper focuses on NASA programs, results may be applicable to a variety of industrial environments.

  12. Records of wells, ground-water levels, and ground-water withdrawals in the lower Goose Creek Basin, Cassia County, Idaho

    USGS Publications Warehouse

    Mower, R.W.

    1954-01-01

    Investigations by the United States Geological Survey of Ground Water in the Southern border area of the Snake Rive Plain, south of the Snake River, a re concerned at the present time with delineation of the principal ground-water districts, the extent and location of existing ground-water developments, the possibilities for additional development, and the effects of ground-water development on the regimen of streams and reservoirs whose waters are appropriate for beneficial use. The lower part of the Goose Creek Basin is one of the important ground-water districts of the southern plains area and there are substantial but spotty developments of ground water for irrigation in the basin. Several thousand irrigable acres that are now dry could be put under irrigation if a dependable supply of ground water could be developed. The relations of the ground-water reservoirs to the regime of the Snake River and Goose Cree, and to the large body of ground water in the Snake River Plain north of the Snake, are poorly known. A large amount of geologic and hydrologic study remains to be done before those relations can be accurately determined. Investigations will be continued in the future but file work and preparation of a comprehensive report inevitably will be delayed. Therefore the available records are presented herein in order to make them accessible to farmers, well drillers, government agencies, and the general public. Interpretation of the records is not attempted in this report and is deferred pending the accumulation of additional and quantitative information. The data summarized herein include records of the locations and physical characteristics of wells, the depth to water in wells, fluctuations of water levels in observation wells, and estimated rates and volumes of seasonal ans yearly ground-water pumpage for irrigation, municipal, and other uses. This information is complete for work done as of December 31, 1952. The investigations upon which this report is based were undertaken in cooperation with the U.S. Bureau of Reclamation, Region I, at the request of the Planning Division, Central Snake River District. The report was complied in the first instance for the use of the Bureau of Reclamation but is now released to the public. The observation-well program in the area has been maintained in cooperation with the Idaho State Department of Reclamation as part of the regular cooperative program of the Geological Survey.

  13. Cenozoic tectonic subsidence in the Southern Continental Margin, South China Sea

    NASA Astrophysics Data System (ADS)

    Fang, Penggao; Ding, Weiwei; Fang, Yinxia; Zhao, Zhongxian; Feng, Zhibing

    2017-06-01

    We analyzed two recently acquired multichannel seismic profiles across the Dangerous Grounds and the Reed Bank area in the South China Sea. Reconstruction of the tectonic subsidence shows that the southern continental margin can be divided into three stages with variable subsidence rate. A delay of tectonic subsidence existed in both areas after a break-up, which was likely related to the major mantle convection during seafloor spreading, that was triggered by the secondary mantle convection below the continental margin, in addition to the variation in lithospheric thickness. Meanwhile, the stage with delayed subsidence rate differed along strikes. In the Reed Bank area, this stage is between 32-23.8 Ma, while in the Dangerous Grounds, it was much later (between 19-15.5 Ma). We believe the propagated rifting in the South China Sea dominated the changes of this delayed subsidence rate stage.

  14. Sensitivity of EAS measurements to the energy spectrum of muons

    NASA Astrophysics Data System (ADS)

    Espadanal, J.; Cazon, L.; Conceição, R.

    2017-01-01

    We have studied how the energy spectrum of muons at production affects some of the most common measurements related to muons in extensive air shower studies, namely, the number of muons at the ground, the slope of the lateral distribution of muons, the apparent muon production depth, and the arrival time delay of muons at ground. We found that by changing the energy spectrum by an amount consistent with the difference between current models (namely EPOS-LHC and QGSJET-II.04), the muon surface density at ground increases 5% at 20° zenith angle and 17% at 60° zenith angle. This effect introduces a zenith angle dependence on the reconstructed number of muons which might be experimentally observed. The maximum of the muon production depth distribution at 40° increases ∼ 10 g/cm2 and ∼ 0 g/cm2 at 60°, which, from pure geometrical considerations, increases the arrival time delay of muons. There is an extra contribution to the delay due to the subluminal velocities of muons of the order of ∼ 3 ns at all zenith angles. Finally, changes introduced in the logarithmic slope of the lateral density function are less than 2%.

  15. Local flow management/profile descent algorithm. Fuel-efficient, time-controlled profiles for the NASA TSRV airplane

    NASA Technical Reports Server (NTRS)

    Groce, J. L.; Izumi, K. H.; Markham, C. H.; Schwab, R. W.; Thompson, J. L.

    1986-01-01

    The Local Flow Management/Profile Descent (LFM/PD) algorithm designed for the NASA Transport System Research Vehicle program is described. The algorithm provides fuel-efficient altitude and airspeed profiles consistent with ATC restrictions in a time-based metering environment over a fixed ground track. The model design constraints include accommodation of both published profile descent procedures and unpublished profile descents, incorporation of fuel efficiency as a flight profile criterion, operation within the performance capabilities of the Boeing 737-100 airplane with JT8D-7 engines, and conformity to standard air traffic navigation and control procedures. Holding and path stretching capabilities are included for long delay situations.

  16. 30 CFR 77.2 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Definitions. For the purpose of this part 77, the term: (a) Active workings means any place in a coal mine where miners are normally required to work or travel; (b) American Table of Distances means the current... detonators, and delay electric blasting caps. (p) Electrical grounding means to connect with the ground to...

  17. AGN Space Telescope and Optical Reverberation Mapping Project. IV. Velocity-Delay Mapping of Broad Emission Lines in NGC 5548

    NASA Astrophysics Data System (ADS)

    Horne, Keith D.; Agn Storm Team

    2015-01-01

    Two-dimensional velocity-delay maps of AGN broad emission line regions can be recovered by modelling observations of reverberating emission-line profiles on the assumption that the line profile variations are driven by changes in ionising radiation from a compact source near the black hole. The observable light travel time delay resolves spatial structure on iso-delay paraboloids, while the doppler shift resolves kinematic structure along the observer's line-of-sight. Velocity-delay maps will be presented and briefly discussed for the Lyman alpha, CIV and Hbeta line profiles based on the HST and ground-based spectrophotometric monitoring of NGC 5548 during the 2014 AGN STORM campaign.

  18. Planning and Estimation of Operations Support Requirements

    NASA Technical Reports Server (NTRS)

    Newhouse, Marilyn E.; Barley, Bryan; Bacskay, Allen; Clardy, Dennon

    2010-01-01

    Life Cycle Cost (LCC) estimates during the proposal and early design phases, as well as project replans during the development phase, are heavily focused on hardware development schedules and costs. Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead to de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Any LCC growth can directly impact the programs' ability to fund new missions, and even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations. The National Aeronautics and Space Administration (NASA) D&NF Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that 4 out of the 5 missions studied had significant overruns at or after launch due to underestimation of the complexity and supporting requirements for operations activities; the fifth mission had not launched at the time of the mission. The drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This paper updates the D&NF LCC study, looking at the operations (phase E) cost drivers in more detail and extending the study to include 2 additional missions and identifies areas for increased emphasis by project management in order to improve the fidelity of operations estimates.

  19. Estimability of geodetic parameters from space VLBI observables

    NASA Technical Reports Server (NTRS)

    Adam, Jozsef

    1990-01-01

    The feasibility of space very long base interferometry (VLBI) observables for geodesy and geodynamics is investigated. A brief review of space VLBI systems from the point of view of potential geodetic application is given. A selected notational convention is used to jointly treat the VLBI observables of different types of baselines within a combined ground/space VLBI network. The basic equations of the space VLBI observables appropriate for convariance analysis are derived and included. The corresponding equations for the ground-to-ground baseline VLBI observables are also given for a comparison. The simplified expression of the mathematical models for both space VLBI observables (time delay and delay rate) include the ground station coordinates, the satellite orbital elements, the earth rotation parameters, the radio source coordinates, and clock parameters. The observation equations with these parameters were examined in order to determine which of them are separable or nonseparable. Singularity problems arising from coordinate system definition and critical configuration are studied. Linear dependencies between partials are analytically derived. The mathematical models for ground-space baseline VLBI observables were tested with simulation data in the frame of some numerical experiments. Singularity due to datum defect is confirmed.

  20. Ground-Based GPS Sensing of Azimuthal Variations in Precipitable Water Vapor

    NASA Technical Reports Server (NTRS)

    Kroger, P. M.; Bar-Sever, Y. E.

    1997-01-01

    Current models for troposphere delay employed by GPS software packages map the total zenith delay to the line-of-sight delay of the individual satellite-receiver link under the assumption of azimuthal homogeneity. This could be a poor approximation for many sites, in particular, those located at an ocean front or next to a mountain range. We have modified the GIPSY-OASIS II software package to include a simple non-symmetric mapping function (MacMillan, 1995) which introduces two new parameters.

  1. Actual Operation Simulation of RESSOX Ground Experiments

    DTIC Science & Technology

    2010-11-01

    Note 1289,” (Hewlett-Packard), 60 pp. [5] F. Tappero, A. Dempster, T . Iwata, M. Imae, T . Ikegami , Y. Fukuyama, K. Hagimoto, and A. Iwasaki, 2006...Delay Ionospheric Delay Ku-band Delay Estimation Frequency- Independent part Frequency- Dependent part Elapsed Time with Current Time Set as 0 (s) T ...im e t o b e A d ju s te d 0-6-105 Extrapolated with First- Order Least-Squares Filter Time Adjustment Command 42 nd Annual Precise Time and Time

  2. Extending Wheeler’s delayed-choice experiment to space

    PubMed Central

    Vedovato, Francesco; Agnesi, Costantino; Schiavon, Matteo; Dequal, Daniele; Calderaro, Luca; Tomasin, Marco; Marangon, Davide G.; Stanco, Andrea; Luceri, Vincenza; Bianco, Giuseppe; Vallone, Giuseppe; Villoresi, Paolo

    2017-01-01

    Gedankenexperiments have consistently played a major role in the development of quantum theory. A paradigmatic example is Wheeler’s delayed-choice experiment, a wave-particle duality test that cannot be fully understood using only classical concepts. We implement Wheeler’s idea along a satellite-ground interferometer that extends for thousands of kilometers in space. We exploit temporal and polarization degrees of freedom of photons reflected by a fast-moving satellite equipped with retroreflecting mirrors. We observe the complementary wave- or particle-like behaviors at the ground station by choosing the measurement apparatus while the photons are propagating from the satellite to the ground. Our results confirm quantum mechanical predictions, demonstrating the need of the dual wave-particle interpretation at this unprecedented scale. Our work paves the way for novel applications of quantum mechanics in space links involving multiple photon degrees of freedom. PMID:29075668

  3. Strength of figure-ground activity in monkey primary visual cortex predicts saccadic reaction time in a delayed detection task.

    PubMed

    Supèr, Hans; Lamme, Victor A F

    2007-06-01

    When and where are decisions made? In the visual system a saccade, which is a fast shift of gaze toward a target in the visual scene, is the behavioral outcome of a decision. Current neurophysiological data and reaction time models show that saccadic reaction times are determined by a build-up of activity in motor-related structures, such as the frontal eye fields. These structures depend on the sensory evidence of the stimulus. Here we use a delayed figure-ground detection task to show that late modulated activity in the visual cortex (V1) predicts saccadic reaction time. This predictive activity is part of the process of figure-ground segregation and is specific for the saccade target location. These observations indicate that sensory signals are directly involved in the decision of when and where to look.

  4. Bridging the Technology Readiness "Valley of Death" Utilizing Nanosats

    NASA Technical Reports Server (NTRS)

    Bauer, Robert A.; Millar, Pamela S.; Norton, Charles D.

    2015-01-01

    Incorporating new technology is a hallmark of space missions. Missions demand ever-improving tools and techniques to allow them to meet the mission science requirements. In Earth Science, these technologies are normally expressed in new instrument capabilities that can enable new measurement concepts, extended capabilities of existing measurement techniques, or totally new detection capabilities, and also, information systems technologies that can enhance data analysis or enable new data analyses to advance modeling and prediction capabilities. Incorporating new technologies has never been easy. There is a large development step beyond demonstration in a laboratory or on an airborne platform to the eventual space environment that is sometimes referred to as the "technology valley of death." Studies have shown that non-validated technology is a primary cause of NASA and DoD mission delays and cost overruns. With the demise of the New Millennium Program within NASA, opportunities for demonstrating technologies in space have been rare. Many technologies are suitable for a flight project after only ground testing. However, some require validation in a relevant or a space flight environment, which cannot be fully tested on the ground or in airborne systems. NASA's Earth Science Technology Program has initiated a nimble program to provide a fairly rapid turn-around of space validated technologies, and thereby reducing future mission risk in incorporating new technologies. The program, called In-Space Validation of Earth Science Technology (InVEST), now has five tasks in development. Each are 3U CubeSats and they are targeted for launch opportunities in the 2016 time period. Prior to formalizing an InVEST program, the technology program office was asked to demonstrate how the program would work and what sort of technologies could benefit from space validation. Three projects were developed and launched, and have demonstrated the technologies that they set out to validate. This paper will provide a brief status of the pre-InVEST CubeSats, and discuss the development and status of the InVEST program. Figure

  5. Development of X-33/X-34 Aerothermodynamic Data Bases: Lessons Learned and Future Enhancements

    NASA Technical Reports Server (NTRS)

    Miller, C. G.

    2000-01-01

    A synoptic of programmatic and technical lessons learned in the development of aerothermodynamic data bases for the X-33 and X-34 programs is presented in general terms and from the perspective of the NASA Langley Research Center Aerothermodynamics Branch. The format used is that of the "aerothermodynamic chain," the links of which are personnel, facilities, models/test articles, instrumentation, test techniques, and computational fluid dynamics (CFD). Because the aerodynamic data bases upon which the X-33 and X-34 vehicles will fly are almost exclusively from wind tunnel testing, as opposed to CFD, the primary focus of the lessons learned is on ground-based testing. The period corresponding to the development of X-33 and X-34 aerothermodynamic data bases was challenging, since a number of other such programs (e.g., X-38, X-43) competed for resources at a time of downsizing of personnel, facilities, etc., outsourcing, and role changes as NASA Centers served as subcontractors to industry. The impact of this changing environment is embedded in the lessons learned. From a technical perspective, the relatively long times to design and fabricate metallic force and moment models, delays in delivery of models, and a lack of quality assurance to determine the fidelity of model outer mold lines (OML) prior to wind tunnel testing had a major negative impact on the programs. On the positive side, the application of phosphor thermography to obtain global, quantitative heating distributions on rapidly fabricated ceramic models revolutionized the aerothermodynamic optimization of vehicle OMLs, control surfaces, etc. Vehicle designers were provided with aeroheating information prior to, or in conjunction with, aerodynamic information early in the program, thereby allowing trades to be made with both sets of input; in the past only aerodynamic data were available as input. Programmatically, failure to include transonic aerodynamic wind tunnel tests early in the assessment phase led to delays in the optimization phase, as OMLs required modification to provide adequate transonic aerodynamic performance without sacrificing subsonic and hypersonic performance. Funding schedules for industry, based on technical milestones, also presented challenges to aerothermodynamics seeking optimum flying characteristics across the subsonic to hypersonic speed regimes and minimum aeroheating. This paper is concluded with a brief discussion of enhancements in ground-based testing/CFD capabilities necessary to partially/fully satisfy future requirements.

  6. Separation Assurance and Scheduling Coordination in the Arrival Environment

    NASA Technical Reports Server (NTRS)

    Aweiss, Arwa S.; Cone, Andrew C.; Holladay, Joshua J.; Munoz, Epifanio; Lewis, Timothy A.

    2016-01-01

    Separation assurance (SA) automation has been proposed as either a ground-based or airborne paradigm. The arrival environment is complex because aircraft are being sequenced and spaced to the arrival fix. This paper examines the effect of the allocation of the SA and scheduling functions on the performance of the system. Two coordination configurations between an SA and an arrival management system are tested using both ground and airborne implementations. All configurations have a conflict detection and resolution (CD&R) system and either an integrated or separated scheduler. Performance metrics are presented for the ground and airborne systems based on arrival traffic headed to Dallas/ Fort Worth International airport. The total delay, time-spacing conformance, and schedule conformance are used to measure efficiency. The goal of the analysis is to use the metrics to identify performance differences between the configurations that are based on different function allocations. A surveillance range limitation of 100 nmi and a time delay for sharing updated trajectory intent of 30 seconds were implemented for the airborne system. Overall, these results indicate that the surveillance range and the sharing of trajectories and aircraft schedules are important factors in determining the efficiency of an airborne arrival management system. These parameters are not relevant to the ground-based system as modeled for this study because it has instantaneous access to all aircraft trajectories and intent. Creating a schedule external to the CD&R and the scheduling conformance system was seen to reduce total delays for the airborne system, and had a minor effect on the ground-based system. The effect of an external scheduler on other metrics was mixed.

  7. Studies of cosmic plasma using radioastron VLBI observations of giant pulses of the pulsar B0531+21

    NASA Astrophysics Data System (ADS)

    Rudnitskii, A. G.; Karuppusamy, R.; Popov, M. V.; Soglasnov, V. A.

    2016-02-01

    The structure of the interstellar plasma in the direction of the pulsar in the Crab Nebula is studied using several sets of space-VLBI observations obtained with networks of ground telescopes and the RadioAstron space antenna at 18 and 92 cm. Six observing sessions spanning two years are analyzed. Giant pulses are used to probe the cosmic plasma, making it possible to measure the scattering parameters without averaging. More than 4000 giant pulses were detected. The interferometer responses (visibility functions) on ground and ground-space baselines are analyzed. On the ground baselines, the visibility function as a function of delay is dominated by a narrow feature at zero delay with a width of δ τ ~ 1/B, where B is the receiver bandwidth. This is typical for compact continuum sources. On the ground-space baselines, the visibility function contains a set of features superposed on each other and distributed within a certain interval of delays, which we identify with the scattering time for the interfering rays τ. The amplitude of the visibility function on ground baselines falls with increasing baseline; the scattering disk is partially resolved at 18 cmand fully resolved at 92 cm. Estimates of the scattering angle ? give 0.5-1.3mas at 18 cm and 14.0 mas at 92 cm. The measured values of ? and τ are compared to estimate the distance from the source to the effective scattering screen, which is found at various epochs to be located at distances from 0.33 to 0.96 of the distance from the observer to the pulsar, about 2 kpc. The screen is close to the Crab Nebula at epochs of strong scattering, confirming that scattering on inhomogeneities in the plasma in the vicinity of the nebula itself dominates at these epochs.

  8. Why wait? The social determinants underlying tuberculosis diagnostic delay

    PubMed Central

    Saunders, Matthew James; Zegarra, Roberto; Evans, Carlton; Alegria-Flores, Kei; Guio, Heinner

    2017-01-01

    Background Early detection and diagnosis of tuberculosis remain major global priorities for tuberculosis control. Few studies have used a qualitative approach to investigate the social determinants contributing to diagnostic delay and none have compared data collected from individual, community, and health-system levels. We aimed to characterize the social determinants that contribute to diagnostic delay among persons diagnosed with tuberculosis living in resource-constrained settings. Methods/Principle findings Data were collected in public health facilities with high tuberculosis incidence in 19 districts of Lima, Peru. Semi-structured interviews with persons diagnosed with tuberculosis (n = 105) and their family members (n = 63) explored health-seeking behaviours, community perceptions of tuberculosis and socio-demographic circumstances. Focus groups (n = 6) were conducted with health personnel (n = 35) working in the National Tuberculosis Program. All interview data were transcribed and analysed using a grounded theory approach. The median delay between symptom onset and the public health facility visit that led to the first positive diagnostic sample was 57 days (interquartile range 28–126). The great majority of persons diagnosed with tuberculosis distrusted the public health system and sought care at public health facilities only after exhausting other options. It was universally agreed that persons diagnosed with tuberculosis faced discrimination by public and health personnel. Self-medication with medicines bought at local pharmacies was reported as the most common initial health-seeking behaviour due to the speed and low-cost of treatment in pharmacies. Most persons diagnosed with tuberculosis initially perceived their illness as a simple virus. Conclusions Diagnostic delay was common and prolonged. When individuals reached a threshold of symptom severity, they addressed their health with the least time-consuming, most economically feasible, and well-known healthcare option available to them. In high-burden settings, more human and material resources are required to promote tuberculosis case-finding initiatives, reduce tuberculosis associated stigma and address the social determinants underlying diagnostic delay. PMID:28945782

  9. Why wait? The social determinants underlying tuberculosis diagnostic delay.

    PubMed

    Bonadonna, Lily Victoria; Saunders, Matthew James; Zegarra, Roberto; Evans, Carlton; Alegria-Flores, Kei; Guio, Heinner

    2017-01-01

    Early detection and diagnosis of tuberculosis remain major global priorities for tuberculosis control. Few studies have used a qualitative approach to investigate the social determinants contributing to diagnostic delay and none have compared data collected from individual, community, and health-system levels. We aimed to characterize the social determinants that contribute to diagnostic delay among persons diagnosed with tuberculosis living in resource-constrained settings. Data were collected in public health facilities with high tuberculosis incidence in 19 districts of Lima, Peru. Semi-structured interviews with persons diagnosed with tuberculosis (n = 105) and their family members (n = 63) explored health-seeking behaviours, community perceptions of tuberculosis and socio-demographic circumstances. Focus groups (n = 6) were conducted with health personnel (n = 35) working in the National Tuberculosis Program. All interview data were transcribed and analysed using a grounded theory approach. The median delay between symptom onset and the public health facility visit that led to the first positive diagnostic sample was 57 days (interquartile range 28-126). The great majority of persons diagnosed with tuberculosis distrusted the public health system and sought care at public health facilities only after exhausting other options. It was universally agreed that persons diagnosed with tuberculosis faced discrimination by public and health personnel. Self-medication with medicines bought at local pharmacies was reported as the most common initial health-seeking behaviour due to the speed and low-cost of treatment in pharmacies. Most persons diagnosed with tuberculosis initially perceived their illness as a simple virus. Diagnostic delay was common and prolonged. When individuals reached a threshold of symptom severity, they addressed their health with the least time-consuming, most economically feasible, and well-known healthcare option available to them. In high-burden settings, more human and material resources are required to promote tuberculosis case-finding initiatives, reduce tuberculosis associated stigma and address the social determinants underlying diagnostic delay.

  10. Robust Real-Time Wide-Area Differential GPS Navigation

    NASA Technical Reports Server (NTRS)

    Yunck, Thomas P. (Inventor); Bertiger, William I. (Inventor); Lichten, Stephen M. (Inventor); Mannucci, Anthony J. (Inventor); Muellerschoen, Ronald J. (Inventor); Wu, Sien-Chong (Inventor)

    1998-01-01

    The present invention provides a method and a device for providing superior differential GPS positioning data. The system includes a group of GPS receiving ground stations covering a wide area of the Earth's surface. Unlike other differential GPS systems wherein the known position of each ground station is used to geometrically compute an ephemeris for each GPS satellite. the present system utilizes real-time computation of satellite orbits based on GPS data received from fixed ground stations through a Kalman-type filter/smoother whose output adjusts a real-time orbital model. ne orbital model produces and outputs orbital corrections allowing satellite ephemerides to be known with considerable greater accuracy than from die GPS system broadcasts. The modeled orbits are propagated ahead in time and differenced with actual pseudorange data to compute clock offsets at rapid intervals to compensate for SA clock dither. The orbital and dock calculations are based on dual frequency GPS data which allow computation of estimated signal delay at each ionospheric point. These delay data are used in real-time to construct and update an ionospheric shell map of total electron content which is output as part of the orbital correction data. thereby allowing single frequency users to estimate ionospheric delay with an accuracy approaching that of dual frequency users.

  11. An Analysis of Delay and Travel Times at Sao Paulo International Airport (AISP/GRU): Planning Based on Simulation Model

    NASA Technical Reports Server (NTRS)

    Santana, Erico Soriano Martins; Mueller, Carlos

    2003-01-01

    The occurrence of flight delays in Brazil, mostly verified at the ground (airfield), is responsible for serious disruptions at the airport level but also for the unchaining of problems in all the airport system, affecting also the airspace. The present study develops an analysis of delay and travel times at Sao Paulo International Airport/ Guarulhos (AISP/GRU) airfield based on simulation model. Different airport physical and operational scenarios had been analyzed by means of simulation. SIMMOD Plus 4.0, the computational tool developed to represent aircraft operation in the airspace and airside of airports, was used to perform these analysis. The study was mainly focused on aircraft operations on ground, at the airport runway, taxi-lanes and aprons. The visualization of the operations with increasing demand facilitated the analyses. The results generated in this work certify the viability of the methodology, they also indicated the solutions capable to solve the delay problem by travel time analysis, thus diminishing the costs for users mainly airport authority. It also indicated alternatives for airport operations, assisting the decision-making process and in the appropriate timing of the proposed changes in the existing infrastructure.

  12. Application of InSAR and GIS techniques to ground subsidence assessment in the Nobi Plain, Central Japan.

    PubMed

    Zheng, Minxue; Fukuyama, Kaoru; Sanga-Ngoie, Kazadi

    2013-12-31

    Spatial variation and temporal changes in ground subsidence over the Nobi Plain, Central Japan, are assessed using GIS techniques and ground level measurements data taken over this area since the 1970s. Notwithstanding the general slowing trend observed in ground subsidence over the plains, we have detected ground rise at some locations, more likely due to the ground expansion because of recovering groundwater levels and the tilting of the Nobi land mass. The problem of non-availability of upper-air meteorological information, especially the 3-dimensional water vapor distribution, during the JERS-1 observational period (1992-1998) was solved by applying the AWC (analog weather charts) method onto the high-precision GPV-MSM (Grid Point Value of Meso-Scale Model) water-vapor data to find the latter's matching meteorological data. From the selected JERS-1 interferometry pair and the matching GPV-MSM meteorological data, the atmospheric path delay generated by water vapor inhomogeneity was then quantitatively evaluated. A highly uniform spatial distribution of the atmospheric delay, with a maximum deviation of approximately 38 mm in its horizontal distribution was found over the Plain. This confirms the effectiveness of using GPV-MSM data for SAR differential interferometric analysis, and sheds thus some new light on the possibility of improving InSAR analysis results for land subsidence applications.

  13. Application of InSAR and GIS Techniques to Ground Subsidence Assessment in the Nobi Plain, Central Japan

    PubMed Central

    Zheng, Minxue; Fukuyama, Kaoru; Sanga-Ngoie, Kazadi

    2014-01-01

    Spatial variation and temporal changes in ground subsidence over the Nobi Plain, Central Japan, are assessed using GIS techniques and ground level measurements data taken over this area since the 1970s. Notwithstanding the general slowing trend observed in ground subsidence over the plains, we have detected ground rise at some locations, more likely due to the ground expansion because of recovering groundwater levels and the tilting of the Nobi land mass. The problem of non-availability of upper-air meteorological information, especially the 3-dimensional water vapor distribution, during the JERS-1 observational period (1992–1998) was solved by applying the AWC (analog weather charts) method onto the high-precision GPV-MSM (Grid Point Value of Meso-Scale Model) water-vapor data to find the latter's matching meteorological data. From the selected JERS-1 interferometry pair and the matching GPV-MSM meteorological data, the atmospheric path delay generated by water vapor inhomogeneity was then quantitatively evaluated. A highly uniform spatial distribution of the atmospheric delay, with a maximum deviation of approximately 38 mm in its horizontal distribution was found over the Plain. This confirms the effectiveness of using GPV-MSM data for SAR differential interferometric analysis, and sheds thus some new light on the possibility of improving InSAR analysis results for land subsidence applications. PMID:24385028

  14. Chapter 17: Residential Behavior Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurnik, Charles W.; Stewart, James; Todd, Annika

    Residential behavior-based (BB) programs use strategies grounded in the behavioral and social sciences to influence household energy use. These may include providing households with real-time or delayed feedback about their energy use; supplying energy efficiency education and tips; rewarding households for reducing their energy use; comparing households to their peers; and establishing games, tournaments, and competitions. BB programs often target multiple energy end uses and encourage energy savings, demand savings, or both. Savings from BB programs are usually a small percentage of energy use, typically less than 5 percent. Utilities will continue to implement residential BB programs as large-scale, randomizedmore » control trials (RCTs); however, some are now experimenting with alternative program designs that are smaller scale; involve new communication channels such as the web, social media, and text messaging; or that employ novel strategies for encouraging behavior change (for example, Facebook competitions). These programs will create new evaluation challenges and may require different evaluation methods than those currently employed to verify any savings they generate. Quasi-experimental methods, however, require stronger assumptions to yield valid savings estimates and may not measure savings with the same degree of validity and accuracy as randomized experiments.« less

  15. Optimal design of mixed-media packet-switching networks - Routing and capacity assignment

    NASA Technical Reports Server (NTRS)

    Huynh, D.; Kuo, F. F.; Kobayashi, H.

    1977-01-01

    This paper considers a mixed-media packet-switched computer communication network which consists of a low-delay terrestrial store-and-forward subnet combined with a low-cost high-bandwidth satellite subnet. We show how to route traffic via ground and/or satellite links by means of static, deterministic procedures and assign capacities to channels subject to a given linear cost such that the network average delay is minimized. Two operational schemes for this network model are investigated: one is a scheme in which the satellite channel is used as a slotted ALOHA channel; the other is a new multiaccess scheme we propose in which whenever a channel collision occurs, retransmission of the involved packets will route through ground links to their destinations. The performance of both schemes is evaluated and compared in terms of cost and average packet delay tradeoffs for some examples. The results offer guidelines for the design and optimal utilization of mixed-media networks.

  16. 76 FR 76890 - Nutrition Labeling of Single-Ingredient Products and Ground or Chopped Meat and Poultry Products...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-09

    .... FSIS-2005-0018] Nutrition Labeling of Single-Ingredient Products and Ground or Chopped Meat and Poultry... (FSIS) is delaying the effective date of the final regulations that require nutrition labeling of the... December 29, 2010, FSIS published the final rule, ``Nutrition Labeling of Single-Ingredient Products and...

  17. Interaction of Airspace Partitions and Traffic Flow Management Delay with Weather

    NASA Technical Reports Server (NTRS)

    Lee, Hak-Tae; Chatterji, Gano B.; Palopo, Kee

    2011-01-01

    The interaction of partitioning the airspace and delaying flights in the presence of convective weather is explored to study how re-partitioning the airspace can help reduce congestion and delay. Three approaches with varying complexities are employed to compute the ground delays.In the first approach, an airspace partition of 335 high-altitude sectors that is based on clear weather day traffic is used. Routes are then created to avoid regions of convective weather. With traffic flow management, this approach establishes the baseline with per-flight delay of 8.4 minutes. In the second approach, traffic flow management is used to select routes and assign departure delays such that only the airport capacity constraints are met. This results in 6.7 minutes of average departure delay. The airspace is then partitioned with a specific capacity. It is shown that airspace-capacity-induced delay can be reduced to zero ata cost of 20percent more sectors for the examined scenario.

  18. Tunable Optical True-Time Delay Devices Would Exploit EIT

    NASA Technical Reports Server (NTRS)

    Kulikov, Igor; DiDomenico, Leo; Lee, Hwang

    2004-01-01

    Tunable optical true-time delay devices that would exploit electromagnetically induced transparency (EIT) have been proposed. Relative to prior true-time delay devices (for example, devices based on ferroelectric and ferromagnetic materials) and electronically controlled phase shifters, the proposed devices would offer much greater bandwidths. In a typical envisioned application, an optical pulse would be modulated with an ultra-wideband radio-frequency (RF) signal that would convey the information that one seeks to communicate, and it would be required to couple differently delayed replicas of the RF signal to the radiating elements of a phased-array antenna. One or more of the proposed devices would be used to impose the delays and/or generate the delayed replicas of the RF-modulated optical pulse. The beam radiated or received by the antenna would be steered by use of a microprocessor-based control system that would adjust operational parameters of the devices to tune the delays to the required values. EIT is a nonlinear quantum optical interference effect that enables the propagation of light through an initially opaque medium. A suitable medium must have, among other properties, three quantum states (see Figure 1): an excited state (state 3), an upper ground state (state 2), and a lower ground state (state 1). These three states must form a closed system that exhibits no decays to other states in the presence of either or both of two laser beams: (1) a probe beam having the wavelength corresponding to the photon energy equal to the energy difference between states 3 and 1; and (2) a coupling beam having the wavelength corresponding to the photon energy equal to the energy difference between states 3 and 2. The probe beam is the one that is pulsed and modulated with an RF signal.

  19. Supporting Multiple Programs and Projects at NASA's Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Stewart, Camiren L.

    2014-01-01

    With the conclusion of the shuttle program in 2011, the National Aeronautics and Space Administration (NASA) had found itself at a crossroads for finding transportation of United States astronauts and experiments to space. The agency would eventually hand off the taxiing of American astronauts to the International Space Station (ISS) that orbits in Low Earth Orbit (LEO) about 210 miles above the earth under the requirements of the Commercial Crew Program (CCP). By privatizing the round trip journey from Earth to the ISS, the space agency has been given the additional time to focus funding and resources to projects that operate beyond LEO; however, adding even more stress to the agency, the premature cancellation of the program that would succeed the Shuttle Program - The Constellation Program (CxP) -it would inevitably delay the goal to travel beyond LEO for a number of years. Enter the Space Launch System (SLS) and the Orion Multipurpose Crew Vehicle (MPCV). Currently, the SLS is under development at NASA's Marshall Spaceflight Center in Huntsville, Alabama, while the Orion Capsule, built by government contractor Lockheed Martin Corporation, has been assembled and is currently under testing at the Kennedy Space Center (KSC) in Florida. In its current vision, SLS will take Orion and its crew to an asteroid that had been captured in an earlier mission in lunar orbit. Additionally, this vehicle and its configuration is NASA's transportation to Mars. Engineers at the Kennedy Space Center are currently working to test the ground systems that will facilitate the launch of Orion and the SLS within its Ground Services Development and Operations (GSDO) Program. Firing Room 1 in the Launch Control Center (LCC) has been refurbished and outfitted to support the SLS Program. In addition, the Spaceport Command and Control System (SCCS) is the underlying control system for monitoring and launching manned launch vehicles. As NASA finds itself at a junction, so does all of its associated centers across the US. KSC has found itself at the blunt end of change as the entire center has transitioned from an operations mindset to a development mentality. The author of this paper has had the fortunate privilege and opportunity to be part of a transforming NASA during the fall months of 2014. The following is a high level account of projects that he had the chance to work on including the Spaceport Command and Control System, the Advanced Ground System and Maintenance Program Project, Customer Avionics Development & Analysis (CAIDA) Lab and Swamp Works.

  20. Observation of β-delayed two-proton emission in the decay of 22Si

    DOE PAGES

    Xu, X. X.; Lin, C. J.; Sun, L. J.; ...

    2017-01-19

    The decay of the lightest nucleus with Tz=-3, 22Si, was studied by a silicon array. A charged-particle group at 5600 (70) keV in the decay-energy spectrum was identified experimentally as β-delayed two-proton emission from the isobaric analog state (IAS) of 22Al. Experimental results of the IAS fed by a superallowed Fermi transition were compared with our large-scale shell-model calculations. The ground-state mass of 22Si was obtained indirectly in the experiment for the first time. Two-proton separation energy for 22Si is deduced to be -108 (125) keV, which indicates that it is a very marginal candidate for two-proton ground-state emission.

  1. Observation of β-delayed two-proton emission in the decay of 22Si

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Xu, X. X.; Lin, C. J.; Sun, L. J.

    The decay of the lightest nucleus with Tz=-3, 22Si, was studied by a silicon array. A charged-particle group at 5600 (70) keV in the decay-energy spectrum was identified experimentally as β-delayed two-proton emission from the isobaric analog state (IAS) of 22Al. Experimental results of the IAS fed by a superallowed Fermi transition were compared with our large-scale shell-model calculations. The ground-state mass of 22Si was obtained indirectly in the experiment for the first time. Two-proton separation energy for 22Si is deduced to be -108 (125) keV, which indicates that it is a very marginal candidate for two-proton ground-state emission.

  2. Force-reflection and shared compliant control in operating telemanipulators with time delay

    NASA Technical Reports Server (NTRS)

    Kim, Won S.; Hannaford, Blake; Bejczy, Antal K.

    1992-01-01

    The performance of an advanced telemanipulation system in the presence of a wide range of time delays between a master control station and a slave robot is quantified. The contemplated applications include multiple satellite links to LEO, geosynchronous operation, spacecraft local area networks, and general-purpose computer-based short-distance designs. The results of high-precision peg-in-hole tasks performed by six test operators indicate that task performance decreased linearly with introduced time delays for both kinesthetic force feedback (KFF) and shared compliant control (SCC). The rate of this decrease was substantially improved with SCC compared to KFF. Task performance at delays above 1 s was not possible using KFF. SCC enabled task performance for such delays, which are realistic values for ground-controlled remote manipulation of telerobots in space.

  3. Aviation System Capacity Program Terminal Area Productivity Project: Ground and Airborne Technologies

    NASA Technical Reports Server (NTRS)

    Giulianetti, Demo J.

    2001-01-01

    Ground and airborne technologies were developed in the Terminal Area Productivity (TAP) project for increasing throughput at major airports by safely maintaining good-weather operating capacity during bad weather. Methods were demonstrated for accurately predicting vortices to prevent wake-turbulence encounters and to reduce in-trail separation requirements for aircraft approaching the same runway for landing. Technology was demonstrated that safely enabled independent simultaneous approaches in poor weather conditions to parallel runways spaced less than 3,400 ft apart. Guidance, control, and situation-awareness systems were developed to reduce congestion in airport surface operations resulting from the increased throughput, particularly during night and instrument meteorological conditions (IMC). These systems decreased runway occupancy time by safely and smoothly decelerating the aircraft, increasing taxi speed, and safely steering the aircraft off the runway. Simulations were performed in which optimal trajectories were determined by air traffic control (ATC) and communicated to flight crews by means of Center TRACON Automation System/Flight Management System (CTASFMS) automation to reduce flight delays, increase throughput, and ensure flight safety.

  4. Sinkholes

    USGS Publications Warehouse

    Kaufmann, James E.

    2007-01-01

    Sinkholes are a common feature in Missouri where limestone and dolomite outcrop. Though often considered a benign nuisance, sudden, catastrophic collapses can destroy property, delay construction projects, and contaminate ground water resources.

  5. Enhanced Software for Scheduling Space-Shuttle Processing

    NASA Technical Reports Server (NTRS)

    Barretta, Joseph A.; Johnson, Earl P.; Bierman, Rocky R.; Blanco, Juan; Boaz, Kathleen; Stotz, Lisa A.; Clark, Michael; Lebovitz, George; Lotti, Kenneth J.; Moody, James M.; hide

    2004-01-01

    The Ground Processing Scheduling System (GPSS) computer program is used to develop streamlined schedules for the inspection, repair, and refurbishment of space shuttles at Kennedy Space Center. A scheduling computer program is needed because space-shuttle processing is complex and it is frequently necessary to modify schedules to accommodate unanticipated events, unavailability of specialized personnel, unexpected delays, and the need to repair newly discovered defects. GPSS implements constraint-based scheduling algorithms and provides an interactive scheduling software environment. In response to inputs, GPSS can respond with schedules that are optimized in the sense that they contain minimal violations of constraints while supporting the most effective and efficient utilization of space-shuttle ground processing resources. The present version of GPSS is a product of re-engineering of a prototype version. While the prototype version proved to be valuable and versatile as a scheduling software tool during the first five years, it was characterized by design and algorithmic deficiencies that affected schedule revisions, query capability, task movement, report capability, and overall interface complexity. In addition, the lack of documentation gave rise to difficulties in maintenance and limited both enhanceability and portability. The goal of the GPSS re-engineering project was to upgrade the prototype into a flexible system that supports multiple- flow, multiple-site scheduling and that retains the strengths of the prototype while incorporating improvements in maintainability, enhanceability, and portability.

  6. Telerobot local-remote control architecture for space flight program applications

    NASA Technical Reports Server (NTRS)

    Zimmerman, Wayne; Backes, Paul; Steele, Robert; Long, Mark; Bon, Bruce; Beahan, John

    1993-01-01

    The JPL Supervisory Telerobotics (STELER) Laboratory has developed and demonstrated a unique local-remote robot control architecture which enables management of intermittent communication bus latencies and delays such as those expected for ground-remote operation of Space Station robotic systems via the Tracking and Data Relay Satellite System (TDRSS) communication platform. The current work at JPL in this area has focused on enhancing the technologies and transferring the control architecture to hardware and software environments which are more compatible with projected ground and space operational environments. At the local site, the operator updates the remote worksite model using stereo video and a model overlay/fitting algorithm which outputs the location and orientation of the object in free space. That information is relayed to the robot User Macro Interface (UMI) to enable programming of the robot control macros. This capability runs on a single Silicon Graphics Inc. machine. The operator can employ either manual teleoperation, shared control, or supervised autonomous control to manipulate the intended object. The remote site controller, called the Modular Telerobot Task Execution System (MOTES), runs in a multi-processor VME environment and performs the task sequencing, task execution, trajectory generation, closed loop force/torque control, task parameter monitoring, and reflex action. This paper describes the new STELER architecture implementation, and also documents the results of the recent autonomous docking task execution using the local site and MOTES.

  7. Framework for a ground-water quality monitoring and assessment program for California

    USGS Publications Warehouse

    Belitz, Kenneth; Dubrovsky, Neil M.; Burow, Karen; Jurgens, Bryant C.; John, Tyler

    2003-01-01

    The State of California uses more ground water than any other State in the Nation. With a population of over 30 million people, an agricultural economy based on intensive irrigation, large urban industrial areas, and naturally elevated concentrations of some trace elements, there is a wide range of contaminant sources that have the potential to contaminate ground water and limit its beneficial uses. In response to the many-and different-potential sources of ground-water contamination, the State of California has evolved an extensive set of rules and programs to protect ground-water quality, and agencies to implement the rules and programs. These programs have in common a focus on compliance with regulations governing chemical use and (or) ground-water quality. Although appropriate for, and successful at, their specific missions, these programs do not at present provide a comprehensive view of ground-water quality in the State of California. In October 2001, The California Assembly passed a bill, AB 599, establishing the Ground-Water- Quality Monitoring Act of 2001.' The goal of AB 599 is to improve Statewide comprehensive ground-water monitoring and increase availability of information about ground-water quality to the public. AB 599 requires the State Water Resources Control Board (SWRCB), in collaboration with an interagency task force (ITF) and a public advisory committee (PAC), to develop a plan for a comprehensive ground-water monitoring program. AB 599 specifies that the comprehensive program should be capable of assessing each ground-water basin in the State through direct and other statistically reliable sampling approaches, and that the program should integrate existing monitoring programs and design new program elements, as necessary. AB 599 also stresses the importance of prioritizing ground-water basins that provide drinking water. The United States Geological Survey (USGS), in cooperation with the SWRCB, and in coordination with the ITF and PAC, has developed a framework for a comprehensive ground-water-quality monitoring and assessment program for California. The proposed framework relies extensively on previous work conducted by the USGS through its National Water-Quality Assessment (NAWQA) program. In particular, the NAWQA program defines three types of ground-water assessment: (1) status, the assessment of the current quality of the ground-water resource; (2) trends, the detection of changes in water quality, and (3) understanding, assessing the human and natural factors that affect ground-water quality. A Statewide, comprehensive ground-water quality-monitoring and assessment program is most efficiently accomplished by applying uniform and consistent study-design and data-collection protocols to the entire State. At the same time, a comprehensive program should be relevant at a variety of scales, and therefore needs to retain flexibility to address regional and local issues. Consequently, many of the program components include a predominant element that will be consistently applied in all basins, and a secondary element that may be applied in specific basins where local conditions warrant attention.

  8. Detection of Transionospheric SuperDARN HF Waves by the Radio Receiver Instrument on the enhanced Polar Outflow Probe Satellite

    NASA Astrophysics Data System (ADS)

    Gillies, R. G.; Yau, A. W.; James, H. G.; Hussey, G. C.; McWilliams, K. A.

    2014-12-01

    The enhanced Polar Outflow Probe (ePOP) Canadian small-satellite was launched in September 2013. Included in this suite of eight scientific instruments is the Radio Receiver Instrument (RRI). The RRI has been used to measure VLF and HF radio waves from various ground and spontaneous ionospheric sources. The first dedicated ground transmission that was detected by RRI was from the Saskatoon Super Dual Auroral Radar Network (SuperDARN) radar on Nov. 7, 2013 at 14 MHz. Several other passes over the Saskatoon SuperDARN radar have been recorded since then. Ground transmissions have also been observed from other radars, such as the SPEAR, HAARP, and SURA ionospheric heaters. However, the focus of this study will be on the results obtained from the SuperDARN passes. An analysis of the signal recorded by the RRI provides estimates of signal power, Doppler shift, polarization, absolute time delay, differential mode delay, and angle of arrival. By comparing these parameters to similar parameters derived from ray tracing simulations, ionospheric electron density structures may be detected and measured. Further analysis of the results from the other ground transmitters and future SuperDARN passes will be used to refine these results.

  9. The role of a low Earth orbiter in intercontinental time synchronization via GPS satellites

    NASA Technical Reports Server (NTRS)

    Wu, S. C.; Ondrasik, V. J.

    1985-01-01

    Time synchronization between two sites using differential GPS has been investigated by a number of researchers. When the two sites are widely separated, the common view period of any GPS satellite becomes shorter; low elevation observations are inevitable. This increase the corrupting effects of the atmospheric delay and, at the same time, narrows the window for such time synchronization. This difficulty can be alleviated by synchronization. This difficulty can be alleviated by using a transit site located midway between the two main sites. The main sites can now look at different GPS satellites which are also in view at the transit site. However, a ground transit site may not always be conveniently available, especially across the Pacific Ocean; also, the inclusion of a ground transit site introduce additional errors due to its location error and local atmospheric delay. An alternative is to use a low Earth orbiter (LEO) as the transit site. A LEO is superior to a ground transit site in three ways: (1) It covers a large part of the Earth in a short period of time and, hence, a single LEO provides worldwide transit services; (2) it is above the troposphere and thus its inclusion does not introduce additional tropospheric delay error; and (3) it provides strong dynamics needed to improve GPS satellite positions which are of importance to ultraprecise time synchronization.

  10. Assessment of Ionospheric Gradient Impacts on Ground-Based Augmentation System (GBAS) Data in Guangdong Province, China

    PubMed Central

    Wang, Zhipeng; Wang, Shujing; Zhu, Yanbo; Xin, Pumin

    2017-01-01

    Ionospheric delay is one of the largest and most variable sources of error for Ground-Based Augmentation System (GBAS) users because inospheric activity is unpredictable. Under normal conditions, GBAS eliminates ionospheric delays, but during extreme ionospheric storms, GBAS users and GBAS ground facilities may experience different ionospheric delays, leading to considerable differential errors and threatening the safety of users. Therefore, ionospheric monitoring and assessment are important parts of GBAS integrity monitoring. To study the effects of the ionosphere on the GBAS of Guangdong Province, China, GPS data collected from 65 reference stations were processed using the improved “Simple Truth” algorithm. In addition, the ionospheric characteristics of Guangdong Province were calculated and an ionospheric threat model was established. Finally, we evaluated the influence of the standard deviation and maximum ionospheric gradient on GBAS. The results show that, under normal ionospheric conditions, the vertical protection level of GBAS was increased by 0.8 m for the largest over bound σvig (sigma of vertical ionospheric gradient), and in the case of the maximum ionospheric gradient conditions, the differential correction error may reach 5 m. From an airworthiness perspective, when the satellite is at a low elevation, this interference does not cause airworthiness risks, but when the satellite is at a high elevation, this interference can cause airworthiness risks. PMID:29019953

  11. Assessment of Ionospheric Gradient Impacts on Ground-Based Augmentation System (GBAS) Data in Guangdong Province, China.

    PubMed

    Wang, Zhipeng; Wang, Shujing; Zhu, Yanbo; Xin, Pumin

    2017-10-11

    Ionospheric delay is one of the largest and most variable sources of error for Ground-Based Augmentation System (GBAS) users because inospheric activity is unpredictable. Under normal conditions, GBAS eliminates ionospheric delays, but during extreme ionospheric storms, GBAS users and GBAS ground facilities may experience different ionospheric delays, leading to considerable differential errors and threatening the safety of users. Therefore, ionospheric monitoring and assessment are important parts of GBAS integrity monitoring. To study the effects of the ionosphere on the GBAS of Guangdong Province, China, GPS data collected from 65 reference stations were processed using the improved "Simple Truth" algorithm. In addition, the ionospheric characteristics of Guangdong Province were calculated and an ionospheric threat model was established. Finally, we evaluated the influence of the standard deviation and maximum ionospheric gradient on GBAS. The results show that, under normal ionospheric conditions, the vertical protection level of GBAS was increased by 0.8 m for the largest over bound σ v i g (sigma of vertical ionospheric gradient), and in the case of the maximum ionospheric gradient conditions, the differential correction error may reach 5 m. From an airworthiness perspective, when the satellite is at a low elevation, this interference does not cause airworthiness risks, but when the satellite is at a high elevation, this interference can cause airworthiness risks.

  12. A Simulation Based Investigation of High Latency Space Systems Operations

    NASA Technical Reports Server (NTRS)

    Li, Zu Qun; Moore, Michael; Bielski, Paul; Crues, Edwin Z.

    2017-01-01

    This study was the first in a series of planned tests to use physics-based subsystem simulations to investigate the interactions between a spacecraft's crew and a ground-based mission control center for vehicle subsystem operations across long communication delays. The simulation models the life support system of a deep space habitat. It contains models of an environmental control and life support system, an electrical power system, an active thermal control systems, and crew metabolic functions. The simulation has three interfaces: 1) a real-time crew interface that can be use to monitor and control the subsystems; 2) a mission control center interface with data transport delays up to 15 minute each way; and 3) a real-time simulation test conductor interface used to insert subsystem malfunctions and observe the interactions between the crew, ground, and simulated vehicle. The study was conducted at the 21st NASA Extreme Environment Mission Operations (NEEMO) mission. The NEEMO crew and ground support team performed a number of relevant deep space mission scenarios that included both nominal activities and activities with system malfunctions. While this initial test sequence was focused on test infrastructure and procedures development, the data collected in the study already indicate that long communication delays have notable impacts on the operation of deep space systems. For future human missions beyond cis-lunar, NASA will need to design systems and support tools to meet these challenges. These will be used to train the crew to handle critical malfunctions on their own, to predict malfunctions and assist with vehicle operations. Subsequent more detailed and involved studies will be conducted to continue advancing NASA's understanding of space systems operations across long communications delays.

  13. A Simulation Based Investigation of High Latency Space Systems Operations

    NASA Technical Reports Server (NTRS)

    Li, Zu Qun; Crues, Edwin Z.; Bielski, Paul; Moore, Michael

    2017-01-01

    This study was the first in a series of planned tests to use physics-based subsystem simulations to investigate the interactions between a spacecraft's crew and a ground-based mission control center for vehicle subsystem operations across long communication delays. The simulation models the life support system of a deep space habitat. It contains models of an environmental control and life support system, an electrical power system, an active thermal control system, and crew metabolic functions. The simulation has three interfaces: 1) a real-time crew interface that can be use to monitor and control the subsystems; 2) a mission control center interface with data transport delays up to 15 minute each way; and 3) a real-time simulation test conductor interface used to insert subsystem malfunctions and observe the interactions between the crew, ground, and simulated vehicle. The study was conducted at the 21st NASA Extreme Environment Mission Operations (NEEMO) mission. The NEEMO crew and ground support team performed a number of relevant deep space mission scenarios that included both nominal activities and activities with system malfunctions. While this initial test sequence was focused on test infrastructure and procedures development, the data collected in the study already indicate that long communication delays have notable impacts on the operation of deep space systems. For future human missions beyond cis-lunar, NASA will need to design systems and support tools to meet these challenges. These will be used to train the crew to handle critical malfunctions on their own, to predict malfunctions, and to assist with vehicle operations. Subsequent more detailed and involved studies will be conducted to continue advancing NASA's understanding of space systems operations across long communications delays.

  14. The slant path atmospheric refraction calibrator - An instrument to measure the microwave propagation delays induced by atmospheric water vapor

    NASA Technical Reports Server (NTRS)

    Walter, Steven J.; Bender, Peter L.

    1992-01-01

    The water vapor-induced propagation delay experienced by a radio signal traversing the atmosphere is characterized by the Slant Path Atmospheric Refraction Calibrator (SPARC), which measures the difference in the travel times between an optical and a microwave signal propagating along the same atmospheric path with an accuracy of 15 picosec or better. Attention is given to the theoretical and experimental issues involved in measuring the delay induced by water vapor; SPARC measurements conducted along a 13.35-km ground-based path are presented, illustrating the instrument's stability, precision, and accuracy.

  15. Delayed visual maturation in infants: a disorder of figure-ground separation?

    PubMed

    Harris, C M; Kriss, A; Shawkat, F; Taylor, D; Russell-Eggitt, I

    1996-01-01

    Delayed visual maturation (DVM) is characterised by visual unresponsiveness in early infancy, which subsequently improves spontaneously to normal levels. We studied the optokinetic response and recorded pattern reversal VEPs in six infants with DVM (aged 2-4 months) when they were at the stage of complete visual unresponsiveness. Although no saccades or visual tracking with the eyes or head could be elicited to visual objects, a normal full-field rapid buildup OKN response occurred when viewing biocularly or during monocular stimulation in the temporo-nasal direction of the viewing eye. Almost no monocular OKN could be elicited in the naso-temporal direction, which was significantly poorer than normal age-matched infants. No OKN quick phases were missed, and there were no other signs of "ocular motor apraxia." VEPs were normal in amplitude and latency for age. It appears, therefore, that infants with DVM are delayed in orienting to local regions of the visual field, but can respond to full-field motion. The presence of normal OKN quick-phases and slow-phases suggests normal brain stem function, and the presence of normal pattern VEPs suggests a normal retino-geniculo-striate pathway. These oculomotor and electrophysiological findings suggest delayed development of extra-striate cortical structures, possibly involving either an abnormality in figure-ground segregation or in attentional pathways.

  16. Shared control on lunar spacecraft teleoperation rendezvous operations with large time delay

    NASA Astrophysics Data System (ADS)

    Ya-kun, Zhang; Hai-yang, Li; Rui-xue, Huang; Jiang-hui, Liu

    2017-08-01

    Teleoperation could be used in space on-orbit serving missions, such as object deorbits, spacecraft approaches, and automatic rendezvous and docking back-up systems. Teleoperation rendezvous and docking in lunar orbit may encounter bottlenecks for the inherent time delay in the communication link and the limited measurement accuracy of sensors. Moreover, human intervention is unsuitable in view of the partial communication coverage problem. To solve these problems, a shared control strategy for teleoperation rendezvous and docking is detailed. The control authority in lunar orbital maneuvers that involves two spacecraft as rendezvous and docking in the final phase was discussed in this paper. The predictive display model based on the relative dynamic equations is established to overcome the influence of the large time delay in communication link. We discuss and attempt to prove via consistent, ground-based simulations the relative merits of fully autonomous control mode (i.e., onboard computer-based), fully manual control (i.e., human-driven at the ground station) and shared control mode. The simulation experiments were conducted on the nine-degrees-of-freedom teleoperation rendezvous and docking simulation platform. Simulation results indicated that the shared control methods can overcome the influence of time delay effects. In addition, the docking success probability of shared control method was enhanced compared with automatic and manual modes.

  17. Use of the VLBI delay observable for orbit determination of Earth-orbiting VLBI satellites

    NASA Technical Reports Server (NTRS)

    Ulvestad, J. S.

    1992-01-01

    Very long-baseline interferometry (VLBI) observations using a radio telescope in Earth orbit were performed first in the 1980s. Two spacecraft dedicated to VLBI are scheduled for launch in 1995; the primary scientific goals of these missions will be astrophysical in nature. This article addresses the use of space VLBI delay data for the additional purpose of improving the orbit determination of the Earth-orbiting spacecraft. In an idealized case of quasi-simultaneous observations of three radio sources in orthogonal directions, analytical expressions are found for the instantaneous spacecraft position and its error. The typical position error is at least as large as the distance corresponding to the delay measurement accuracy but can be much greater for some geometries. A number of practical considerations, such as system noise and imperfect calibrations, set bounds on the orbit-determination accuracy realistically achievable using space VLBI delay data. These effects limit the spacecraft position accuracy to at least 35 cm (and probably 3 m or more) for the first generation of dedicated space VLBI experiments. Even a 35-cm orbital accuracy would fail to provide global VLBI astrometry as accurate as ground-only VLBI. Recommended charges in future space VLBI missions are unlikely to make space VLBI competitive with ground-only VLBI in global astrometric measurements.

  18. Conjugate Ground-Spacecraft Observations of VLF Chorus Elements

    NASA Astrophysics Data System (ADS)

    Demekhov, A. G.; Manninen, J.; Santolík, O.; Titova, E. E.

    2017-12-01

    We present results of simultaneous observations of VLF chorus elements at the ground-based station Kannuslehto in Northern Finland and on board Van Allen Probe A. Visual inspection and correlation analysis of the data reveal one-to-one correspondence of several (at least 12) chorus elements following each other in a sequence. Poynting flux calculated from electromagnetic fields measured by the Electric and Magnetic Field Instrument Suite and Integrated Science instrument on board Van Allen Probe A shows that the waves propagate at small angles to the geomagnetic field and oppositely to its direction, that is, from northern to southern geographic hemisphere. The spacecraft was located at L≃4.1 at a geomagnetic latitude of -12.4∘ close to the plasmapause and inside a localized density inhomogeneity with about 30% density increase and a transverse size of about 600 km. The time delay between the waves detected on the ground and on the spacecraft is about 1.3 s, with ground-based detection leading spacecraft detection. The measured time delay is consistent with the wave travel time of quasi-parallel whistler-mode waves for a realistic profile of the plasma density distribution along the field line. The results suggest that chorus discrete elements can preserve their spectral shape during a hop from the generation region to the ground followed by reflection from the ionosphere and return to the near-equatorial region.

  19. Optimizing an ELF/VLF Phased Array at HAARP

    NASA Astrophysics Data System (ADS)

    Fujimaru, S.; Moore, R. C.

    2013-12-01

    The goal of this study is to maximize the amplitude of 1-5 kHz ELF/VLF waves generated by ionospheric HF heating and measured at a ground-based ELF/VLF receiver. The optimization makes use of experimental observations performed during ELF/VLF wave generation experiments at the High-frequency Active Auroral Research Program (HAARP) Observatory in Gakona, Alaska. During these experiments, the amplitude, phase, and propagation delay of the ELF/VLF waves were carefully measured. The HF beam was aimed at 15 degrees zenith angle in 8 different azimuthal directions, equally spaced in a circle, while broadcasting a 3.25 MHz (X-mode) signal that was amplitude modulated (square wave) with a linear frequency-time chirp between 1 and 5 kHz. The experimental observations are used to provide reference amplitudes, phases, and propagation delays for ELF/VLF waves generated at these specific locations. The presented optimization accounts for the trade-off between duty cycle, heated area, and the distributed nature of the source region in order to construct a "most efficient" phased array. The amplitudes and phases generated by modulated heating at each location are combined in post-processing to find an optimal combination of duty cycle, heating location, and heating order.

  20. [Creation and Evaluation of Educational Programs for Additional Delayed Scan of FDG-PET/CT].

    PubMed

    Wada, Ryota; Kamiya, Takashi; Fujino, Kouichi; Ueda, Junpei; Isohashi, Kayako; Tatsumi, Mitsuaki; Hatazawa, Jun

    Generally, FDG-PET/CT image is acquired at the 60th minute after tracer administration. Depending on the clinical case, additional delayed scans may be useful. However, it is difficult to judge whether additional delayed scan is useful or not. The purposes of this study were creation and evaluation of educational programs to help radiological technologists to decide the usefulness of additional delayed scan of FDG-PET/CT. Educational programs consisted of the instructional materials and the judgment test of clinical cases. The instructional materials provided the valuable findings for differentiation between uptake in the wall of the colon and colon content, distinction between uptake in the lymph node and urinary tract, and evaluation of malignancy. The judgment test of clinical cases consisted of 10 cases selected by a nuclear medicine physician (for 5 of that cases additional delayed scan was decided to be useful). Five experienced technologists and five inexperienced technologists scored the volubility of additional delayed scan pre- and post-training using the instructional materials (the full marks of score is 5). After the educational programs using the instructional materials, the score was improved with the significant difference in both experienced (pre: 3.6±1.4, post: 4.0±1.2) and inexperienced (pre: 2.8±1.5, post: 3.7±1.5) groups (p<0.05). According to the educational programs, technologist might be able to decide whether the additional delayed scan is useful or not. The successful results of this study may improve the interpretation or reduce the total exposure dose of the PET/CT scan.

  1. MSW (Magnetostatic Wave) Variable Time-Delay Techniques.

    DTIC Science & Technology

    1983-09-01

    will be releasable to the general public, including foreign nations. RADC-TR-83-139 has been reviewed and is approved for publication. APPROVED: 4...film carries by itself an infinite set of modes ( exchange effects being ignored). In the absence of ground planes, the secular equation for a single... exchange (3 2 ) * spin waves, which produces regularly spaced narrow-band absorbtions or "notches" in the delay line transmission response. This effect is

  2. Autonomous Mission Manager for Rendezvous, Inspection and Mating

    NASA Technical Reports Server (NTRS)

    Zimpfer, Douglas J.

    2003-01-01

    To meet cost and safety objectives, space missions that involve proximity operations between two vehicles require a high level of autonomy to successfully complete their missions. The need for autonomy is primarily driven by the need to conduct complex operations outside of communication windows, and the communication time delays inherent in space missions. Autonomy also supports the goals of both NASA and the DOD to make space operations more routine, and lower operational costs by reducing the requirement for ground personnel. NASA and the DoD have several programs underway that require a much higher level of autonomy for space vehicles. NASA's Space Launch Initiative (SLI) program has ambitious goals of reducing costs by a factor or 10 and improving safety by a factor of 100. DARPA has recently begun its Orbital Express to demonstrate key technologies to make satellite servicing routine. The Air Force's XSS-ll program is developing a protoflight demonstration of an autonomous satellite inspector. A common element in space operations for many NASA and DOD missions is the ability to rendezvous, inspect anclJor dock with another spacecraft. For DARPA, this is required to service or refuel military satellites. For the Air Force, this is required to inspect un-cooperative resident space objects. For NASA, this is needed to meet the primary SLI design reference mission of International Space Station re-supply. A common aspect for each of these programs is an Autonomous Mission Manager that provides highly autonomous planning, execution and monitoring of the rendezvous, inspection and docking operations. This paper provides an overview of the Autonomous Mission Manager (AMM) design being incorporated into many of these technology programs. This AMM provides a highly scalable level of autonomous operations, ranging from automatic execution of ground-derived plans to highly autonomous onboard planning to meet ground developed mission goals. The AMM provides the capability to automatically execute the plans and monitor the system performance. In the event of system dispersions or failures the AMM can modify plans or abort to assure overall system safety. This paper describes the design and functionality of Draper's AMM framework, presents concept of operations associated with the use of the AMM, and outlines the relevant features of the flight demonstrations.

  3. Delays affecting ITS projects : summary of findings

    DOT National Transportation Integrated Search

    2003-11-01

    This report documents the findings of a program review conducted from October 2002 to September 2003 that investigated what delays continue to affect ITS projects. The program review also identified what actions staffs at state DOTs are taking to add...

  4. Molecular alignment effect on the photoassociation process via a pump-dump scheme.

    PubMed

    Wang, Bin-Bin; Han, Yong-Chang; Cong, Shu-Lin

    2015-09-07

    The photoassociation processes via the pump-dump scheme for the heternuclear (Na + H → NaH) and the homonuclear (Na + Na → Na2) molecular systems are studied, respectively, using the time-dependent quantum wavepacket method. For both systems, the initial atom pair in the continuum of the ground electronic state (X(1)Σ(+)) is associated into the molecule in the bound states of the excited state (A(1)Σ(+)) by the pump pulse. Then driven by a time-delayed dumping pulse, the prepared excited-state molecule can be transferred to the bound states of the ground electronic state. It is found that the pump process can induce a superposition of the rovibrational levels |v, j〉 on the excited state, which can lead to the field-free alignment of the excited-state molecule. The molecular alignment can affect the dumping process by varying the effective coupling intensity between the two electronic states or by varying the population transfer pathways. As a result, the final population transferred to the bound states of the ground electronic state varies periodically with the delay time of the dumping pulse.

  5. Molecular alignment effect on the photoassociation process via a pump-dump scheme

    NASA Astrophysics Data System (ADS)

    Wang, Bin-Bin; Han, Yong-Chang; Cong, Shu-Lin

    2015-09-01

    The photoassociation processes via the pump-dump scheme for the heternuclear (Na + H → NaH) and the homonuclear (Na + Na → Na2) molecular systems are studied, respectively, using the time-dependent quantum wavepacket method. For both systems, the initial atom pair in the continuum of the ground electronic state (X1Σ+) is associated into the molecule in the bound states of the excited state (A1Σ+) by the pump pulse. Then driven by a time-delayed dumping pulse, the prepared excited-state molecule can be transferred to the bound states of the ground electronic state. It is found that the pump process can induce a superposition of the rovibrational levels |v, j> on the excited state, which can lead to the field-free alignment of the excited-state molecule. The molecular alignment can affect the dumping process by varying the effective coupling intensity between the two electronic states or by varying the population transfer pathways. As a result, the final population transferred to the bound states of the ground electronic state varies periodically with the delay time of the dumping pulse.

  6. CNES-NASA Disruption-Tolerant Networking (DTN) Interoperability

    NASA Technical Reports Server (NTRS)

    Mortensen, Dale; Eddy, Wesley M.; Reinhart, Richard C.; Lassere, Francois

    2014-01-01

    Future missions requiring robust internetworking services may use Delay-Disruption-Tolerant Networking (DTN) technology. CNES, NASA, and other international space agencies are committed to using CCSDS standards in their space and ground mission communications systems. The experiment described in this presentation will evaluate operations concepts, system performance, and advance technology readiness for the use of DTN protocols in conjunction with CCSDS ground systems, CCSDS data links, and CCSDS file transfer applications

  7. A Mobile Early Stimulation Program to Support Children with Developmental Delays in Brazil.

    PubMed

    Dias, Raquel da Luz; Silva, Kátia Cristina Correa Guimarães; Lima, Marcela Raquel de Oliveira; Alves, João Guilherme Bezerra; Abidi, Syed Sibte Raza

    2018-01-01

    Developmental delay is a deviation development from the normative milestones during the childhood and it may be caused by neurological disorders. Early stimulation is a standardized and simple technique to treat developmental delays in children (aged 0-3 years), allowing them to reach the best development possible and to mitigate neuropsychomotor sequelae. However, the outcomes of the treatment depending on the involvement of the family, to continue the activities at home on a daily basis. To empower and educate parents of children with neurodevelopmental delays to administer standardized early stimulation programs at home, we developed a mobile early stimulation program that provides timely and evidence-based clinical decision support to health professionals and a personalized guidance to parents about how to administer early stimulation to their child at home.

  8. High Alpha Technology Program (HATP) ground test to flight comparisons

    NASA Technical Reports Server (NTRS)

    Hall, R. M.; Banks, D. W.; Fisher, David F.; Ghaffari, F.; Murri, D. G.; Ross, J. C.; Lanser, Wendy R.

    1994-01-01

    This status paper reviews the experimental ground test program of the High Alpha Technology Program (HATP). The reasons for conducting this ground test program had their origins during the 1970's when several difficulties were experienced during the development programs of both the F-18 and F-16. A careful assessment of ground test to flight correlations appeared to be important for reestablishing a high degree of confidence in our ground test methodology. The current paper will then focus on one aspect of the HATP program that is intended to improve the correlation between ground test and flight, high-alpha gritting. The importance of this work arises from the sensitivity of configurations with smooth-sided forebodies to Reynolds number. After giving examples of the effects of Reynolds number, the paper will highlight efforts at forebody gritting. Finally, the paper will conclude by summarizing the charter of the HATP Experimental Aerodynamics Working Group and future experimental testing plans.

  9. A Simulation Base Investigation of High Latency Space Systems Operations

    NASA Technical Reports Server (NTRS)

    Li, Zu Qun; Crues, Edwin Z.; Bielski, Paul; Moore, Michael

    2017-01-01

    NASA's human space program has developed considerable experience with near Earth space operations. Although NASA has experience with deep space robotic missions, NASA has little substantive experience with human deep space operations. Even in the Apollo program, the missions lasted only a few weeks and the communication latencies were on the order of seconds. Human missions beyond the relatively close confines of the Earth-Moon system will involve missions with durations measured in months and communications latencies measured in minutes. To minimize crew risk and to maximize mission success, NASA needs to develop a better understanding of the implications of these types of mission durations and communication latencies on vehicle design, mission design and flight controller interaction with the crew. To begin to address these needs, NASA performed a study using a physics-based subsystem simulation to investigate the interactions between spacecraft crew and a ground-based mission control center for vehicle subsystem operations across long communication delays. The simulation, built with a subsystem modeling tool developed at NASA's Johnson Space Center, models the life support system of a Mars transit vehicle. The simulation contains models of the cabin atmosphere and pressure control system, electrical power system, drinking and waste water systems, internal and external thermal control systems, and crew metabolic functions. The simulation has three interfaces: 1) a real-time crew interface that can be use to monitor and control the vehicle subsystems; 2) a mission control center interface with data transport delays up to 15 minutes each way; 3) a real-time simulation test conductor interface that can be use to insert subsystem malfunctions and observe the interactions between the crew, ground, and simulated vehicle. The study was conducted at the 21st NASA Extreme Environment Mission Operations (NEEMO) mission between July 18th and Aug 3rd of year 2016. The NEEMO mission provides ideal conditions for this study with crew in the loop, an active control center, and real-time flow of high latency communications and data. NEEMO crew and ground support will work through procedures including activation of the transit vehicle power system, opening the hatch between the transit vehicle and a Mars ascent vehicle, transferring simulated crewmembers between vehicles, overcoming subsystem malfunctions, sending simulated crewmember on extra-vehicular activities, and other housekeeping activities. This study is enhancing the understanding of high latency operations and the advantages and disadvantages of different communication methods. It is also providing results that will help improve the design of simulation interfaces and inform the design of Mars transit vehicles.

  10. Prototype high speed optical delay line for stellar interferometry

    NASA Astrophysics Data System (ADS)

    Colavita, M. M.; Hines, B. E.; Shao, M.; Klose, G. J.; Gibson, B. V.

    1991-12-01

    The long baselines of the next-generation ground-based optical stellar interferometers require optical delay lines which can maintain nm-level path-length accuracy while moving at high speeds. NASA-JPL is currently designing delay lines to meet these requirements. The design is an enhanced version of the Mark III delay line, with the following key features: hardened, large diameter wheels, rather than recirculating ball bearings, to reduce mechanical noise; a friction-drive cart which bears the cable-dragging forces, and drives the optics cart through a force connection only; a balanced PZT assembly to enable high-bandwidth path-length control; and a precision aligned flexural suspension for the optics assembly to minimize bearing noise feedthrough. The delay line is fully programmable in position and velocity, and the system is controlled with four cascaded software feedback loops. Preliminary performance is a jitter in any 5 ms window of less than 10 nm rms for delay rates of up to 28 mm/s; total jitter is less than 10 nm rms for delay rates up to 20 mm/s.

  11. Culturally Grounded Prevention for Minority Youth Populations: A Systematic Review of the Literature

    PubMed Central

    Lauricella, Michela; Valdez, Jessica K.; Okamoto, Scott K.; Helm, Susana; Zaremba, Colleen

    2016-01-01

    Contemporary prevention science has focused on the application of cultural adaptations of evidence-based prevention programs for minority youth populations. Far less is known about culturally grounded methods that are intended to organically develop prevention programs within specific populations and communities. This article systematically reviews recent literature on culturally grounded interventions used to prevent health disparities in ethnic minority youth populations. In this review, we assessed 31 peer-reviewed articles published in 2003 or later that fit inclusionary criteria pertaining to the development and evaluation of culturally grounded prevention programs. The evaluated studies indicated different approaches toward cultural grounding, as well as specific populations, geographic regions, and health issues that have been targeted. Specifically, the findings indicated that most of the studies focused on the development and evaluation of culturally grounded HIV/STI and substance abuse prevention programs for Mexican American, African American, and American Indian/Alaska Native youth residing in the South or Southwestern U.S. These studies largely relied on community-based participatory or qualitative research methods to develop programs from the “ground up.” This review has implications for the development of future culturally grounded and culturally adapted prevention programs targeting underserved minority youth populations and geographic regions. Specifically, it identifies populations and regions where culturally grounded prevention efforts are underdeveloped or non-existent, providing some scientific direction for the future development of these types of programs. PMID:26733384

  12. Culturally Grounded Prevention for Minority Youth Populations: A Systematic Review of the Literature.

    PubMed

    Lauricella, Michela; Valdez, Jessica K; Okamoto, Scott K; Helm, Susana; Zaremba, Colleen

    2016-02-01

    Contemporary prevention science has focused on the application of cultural adaptations of evidence-based prevention programs for minority youth populations. Far less is known about culturally grounded methods that are intended to organically develop prevention programs within specific populations and communities. This article systematically reviews recent literature on culturally grounded interventions used to prevent health disparities in ethnic minority youth populations. In this review, we assessed 31 peer-reviewed articles published in 2003 or later that fit inclusionary criteria pertaining to the development and evaluation of culturally grounded prevention programs. The evaluated studies indicated different approaches toward cultural grounding, as well as specific populations, geographic regions, and health issues that have been targeted. Specifically, the findings indicated that most of the studies focused on the development and evaluation of culturally grounded HIV/STI and substance abuse prevention programs for Mexican-American, African American, and American Indian/Alaska Native youth residing in the South or Southwestern US. These studies largely relied on community-based participatory or qualitative research methods to develop programs from the "ground up." This review has implications for the development of future culturally grounded and culturally adapted prevention programs targeting underserved minority youth populations and geographic regions. Specifically, it identifies populations and regions where culturally grounded prevention efforts are underdeveloped or non-existent, providing some scientific direction for the future development of these types of programs.

  13. A TDR-Based Soil Moisture Monitoring System with Simultaneous Measurement of Soil Temperature and Electrical Conductivity

    PubMed Central

    Skierucha, Wojciech; Wilczek, Andrzej; Szypłowska, Agnieszka; Sławiński, Cezary; Lamorski, Krzysztof

    2012-01-01

    Elements of design and a field application of a TDR-based soil moisture and electrical conductivity monitoring system are described with detailed presentation of the time delay units with a resolution of 10 ps. Other issues discussed include the temperature correction of the applied time delay units, battery supply characteristics and the measurement results from one of the installed ground measurement stations in the Polesie National Park in Poland. PMID:23202009

  14. Estimating Integrated Water Vapor (IWV) regional map distribution using METEOSAT satellite data and GPS Zenith Wet Delay (ZWD)

    NASA Astrophysics Data System (ADS)

    Reuveni, Y.; Leontiev, A.

    2016-12-01

    Using GPS satellites signals, we can study atmospheric processes and coupling mechanisms, which can help us understand the physical conditions in the upper atmosphere that might lead or act as proxies for severe weather events such as extreme storms and flooding. GPS signals received by geodetic stations on the ground are multi-purpose and can also provide estimates of tropospheric zenith delays, which can be converted into mm-accuracy Precipitable Water Vapor (PWV) using collocated pressure and temperature measurements on the ground. Here, we present the use of Israel's geodetic GPS receivers network for extracting tropospheric zenith path delays combined with near Real Time (RT) METEOSAT-10 Water Vapor (WV) and surface temperature pixel intensity values (7.3 and 12.1 channels, respectively) in order to obtain absolute IWV (kg/m2) or PWV (mm) map distribution. The results show good agreement between the absolute values obtained from our triangulation strategy based solely on GPS Zenith Total Delays (ZTD) and METEOSAT-10 surface temperature data compared with available radiosonde Precipitable IWV/PWV absolute values. The presented strategy can provide unprecedented temporal and special IWV/PWV distribution, which is needed as part of the accurate and comprehensive initial conditions pro­vided by upper-air observation systems at temporal and spatial resolutions consistent with the models assimilating them.

  15. Enabling Autonomous Space Mission Operations with Artificial Intelligence

    NASA Technical Reports Server (NTRS)

    Frank, Jeremy

    2017-01-01

    For over 50 years, NASA's crewed missions have been confined to the Earth-Moon system, where speed-of-light communications delays between crew and ground are practically nonexistent. This ground-centered mode of operations, with a large, ground-based support team, is not sustainable for NASAs future human exploration missions to Mars. Future astronauts will need smarter tools employing Artificial Intelligence (AI) techniques make decisions without inefficient communication back and forth with ground-based mission control. In this talk we will describe several demonstrations of astronaut decision support tools using AI techniques as a foundation. These demonstrations show that astronauts tasks ranging from living and working to piloting can benefit from AI technology development.

  16. A Digest and Comparative Analysis of Major Federal Programs Affecting Infants and Toddlers with Handicaps and Their Families.

    ERIC Educational Resources Information Center

    O'Reilly, Fran E.; And Others

    This study analyzes major federal programs designed to provide services to children, from birth through age 2, who have developmental delays or a high probability of developmental delays, and their families. Programs were selected based on their provision of education or health-related services to infants and toddlers with handicaps and their…

  17. A Microdata Model of Delayed Entry Program (DEP) Behavior. Technical Report 666.

    ERIC Educational Resources Information Center

    Phillips, Chester E.; Schmitz, Edward J.

    High personnel loss rates among recruits who have signed up for the Army's Delayed Entry Program (DEP) are becoming an increasing problem for DEP program managers. Therefore, a research project was conducted to examine DEP loss as a function of sociodemography and policy variables at the microdata level. Two DEP loss models were created. The first…

  18. Considerations for use of the RORA program to estimate ground-water recharge from streamflow records

    USGS Publications Warehouse

    Rutledge, A.T.

    2000-01-01

    The RORA program can be used to estimate ground-water recharge in a basin from analysis of a streamflow record. The program can be appropriate for use if the ground-water flow system is characterized by diffuse areal recharge to the water table and discharge to a stream. The use of the program requires an estimate of a recession index, which is the time required for ground-water discharge to recede by one log cycle after recession becomes linear or near-linear on the semilog hydrograph. Although considerable uncertainty is inherent in the recession index, the results of the RORA program may not be sensitive to this variable. Testing shows that the program can yield consistent estimates under conditions that include leakage to or from deeper aquifers and ground-water evapotranspiration. These tests indicate that RORA estimates the net recharge, which is recharge to the water table minus leakage to a deeper aquifer, or recharge minus ground-water evapotranspiration. Before the program begins making calculations it designates days that fit a requirement of antecedent recession, and these days are used in calculations. The program user might increase the antecedent-recession requirement above its default value to reduce the influence of errors that are caused by direct-surface runoff, but other errors can result from the reduction in the number of peaks detected. To obtain an understanding of flow systems, results from the RORA program might be used in conjunction with other methods such as analysis of ground-water levels, estimates of ground-water discharge from other forms of hydrograph separation, and low-flow variables. Relations among variables may be complex for a variety of reasons; for example, there may not be a unique relation between ground-water level and ground-water discharge, ground-water recharge and discharge are not synchronous, and low-flow variables can be related to other factors such as the recession index.

  19. Inclusive intervention to enhance the fundamental movement skills of children without hearing: a preliminary study.

    PubMed

    Gursel, Ferda

    2014-02-01

    The purpose of this study was to assess an intervention program on the fundamental movement skill of students with and without hearing impairment, using the Test of Gross Motor Development-2 (TGMD-2) standardized Turkish norm. Preschool children with and without hearing impairment participated in this study. At the beginning of the study, most of the children with hearing impairment demonstrated developmental delay on the Locomotor subscale (6/7), as did about one-third (4/11) of the children without hearing impairment. For the Object control subscale, 4/7 of children with hearing impairment and none without hearing impairment showed developmental delay prior to the intervention program. After the intervention program, 3/7 children with hearing impairment had developmental delay on the Locomotor subscale. On the Object control subscale, 2/7 children with hearing impairment and none without hearing impairment showed developmental delay. The six-week intervention program improved TGMD-2 scores of children with hearing impairment, yet did not yield statistically significant improvement of fundamental movement skills.

  20. Two vicious circles contributing to a diagnostic delay for tuberculosis patients in Arkhangelsk

    PubMed Central

    Kuznetsov, Vladimir N.; Grjibovski, Andrej M.; Mariandyshev, Andrej O.; Johansson, Eva; Bjune, Gunnar A.

    2014-01-01

    Setting Delay in tuberculosis (TB) diagnosis increases the infectious pool in the community and the risk of development of resistance of mycobacteria, which results in an increased number of deaths. Objective To describe patients’ and doctors’ perceptions of diagnostic delay in TB patients in the Arkhangelsk region and to develop a substantive model to better understand the mechanisms of how these delays are linked to each other. Design A grounded theory approach was used to study the phenomenon of diagnostic delay. Patients with TB diagnostic delay and doctors–phthisiatricians were interviewed. Results A model named ‘sickness trajectory in health-seeking behaviour among tuberculosis patients’ was developed and included two core categories describing two vicious circles of diagnostic delay in patients with TB: ‘limited awareness of the importance to contact the health system’ and ‘limited resources of the health system’ and the categories: ‘factors influencing health-seeking behaviour’ and ‘factors influencing the health system effectiveness’. Men were more likely to report patient delay, while women were more likely to report health system delay. Conclusions To involve people in early medical examinations, it is necessary to increase alertness on TB among patients and to improve health systems in the districts. PMID:25163673

  1. U.S. announces one-year delay for visa waiver program change

    NASA Astrophysics Data System (ADS)

    The U.S. State Department has announced that it is delaying by one year a new rule affecting citizens from visa waiver program countries. The new rule, which was scheduled to go into effect on 1 October 2003, requires visitors from these countries to obtain non-immigrant visas to enter the United States if they do not have machine-readable passports. The announced delay means that this rule will now go into effect 26 October 2004 instead.The delay does not apply to five visa waiver countries—Andorra, Brunei, Liechtenstein, Luxembourg, and Slovenia—because most of the citizens of these nations already carry passports that are machine-readable.

  2. Mapping the Antarctic grounding line with CryoSat-2 radar altimetry

    NASA Astrophysics Data System (ADS)

    Bamber, J. L.; Dawson, G. J.

    2017-12-01

    The grounding line, where grounded ice begins to float, is the boundary at which the ocean has the greatest influence on the ice-sheet. Its position and dynamics are critical in assessing the stability of the ice-sheet, for mass budget calculations and as an input into numerical models. The most reliable approaches to map the grounding line remotely are to measure the limit of tidal flexure of the ice shelf using differential synthetic aperture radar interferometry (DInSAR) or ICESat repeat-track measurements. However, these methods are yet to provide satisfactory spatial and temporal coverage of the whole of the Antarctic grounding zone. It has not been possible to use conventional radar altimetry to map the limit of tidal flexure of the ice shelf because it performs poorly near breaks in slope, commonly associated with the grounding zone. The synthetic aperture radar interferometric (SARin) mode of CryoSat-2, performs better over steeper margins of the ice sheet and allows us to achieve this. The SARin mode combines "delay Doppler" processing with a cross-track interferometer, and enables us to use elevations based on the first return (point of closest approach or POCA) and "swath processed" elevations derived from the time-delayed waveform beyond the first return, to significantly improve coverage. Here, we present a new method to map the limit of tidal motion from a combination of POCA and swath data. We test this new method on the Siple Coast region of the Ross Ice Shelf, and the mapped grounding line is in good agreement with previous observations from DinSAR and ICESat measurements. There is, however, an approximately constant seaward offset between these methods and ours, which we believe is due to the poorer precision of CryoSat-2. This new method has improved the coverage of the grounding zone across the Siple Coast, and can be applied to the rest of Antarctica.

  3. A Clustered Randomized Controlled Trial of the Positive Prevention PLUS Adolescent Pregnancy Prevention Program.

    PubMed

    LaChausse, Robert G

    2016-09-01

    To determine the impact of Positive Prevention PLUS, a school-based adolescent pregnancy prevention program on delaying sexual intercourse, birth control use, and pregnancy. I randomly assigned a diverse sample of ninth grade students in 21 suburban public high schools in California into treatment (n = 2483) and control (n = 1784) groups that participated in a clustered randomized controlled trial. Between October 2013 and May 2014, participants completed baseline and 6-month follow-up surveys regarding sexual behavior and pregnancy. Participants in the treatment group were offered Positive Prevention PLUS, an 11-lesson adolescent pregnancy prevention program. The program had statistically significant impacts on delaying sexual intercourse and increasing the use of birth control. However, I detected no program effect on pregnancy rates at 6-month follow-up. The Positive Prevention PLUS program demonstrated positive impacts on adolescent sexual behavior. This suggests that programs that focus on having students practice risk reduction skills may delay sexual activity and increase birth control use.

  4. Early Calibration Results of CYGNSS Mission

    NASA Astrophysics Data System (ADS)

    Balasubramaniam, R.; Ruf, C. S.; McKague, D. S.; Clarizia, M. P.; Gleason, S.

    2017-12-01

    The first of its kind, GNSS-R complete orbital mission, CYGNSS was successfully launched on Dec 15 2016. The goal of this mission is to accurately forecast the intensification of tropical cyclones by modelling its inner core. The 8 micro observatories of CYGNSS carry a passive instrument called Delay Doppler Mapping Instrument (DDMI). The DDMIs form a 2D representation called the Delay-Doppler Map (DDM) of the forward scattered power signal. Each DDMI outputs 4 DDMs per second which are compressed and sent to the ground resulting in a total of 32 sea-surface measurements produced by the CYGNSS constellation per second. These are subsequently used in the Level-2 wind retrieval algorithm to extract wind speed information. In this paper, we perform calibration and validation of CYGNSS measurements for accurate extraction of wind speed information. The calibration stage involves identification and correction for dependence of the CYGNSS observables namely Normalised Bistatic Radar Cross Section and Leading Edge Slope of the Integrated Delay Waveform over instrument parameters, geometry etc. The validation stage involves training of the Geophysical Model Function over a multitude of ground truth sources during the Atlantic hurricane season and also refined validation of high wind speed data products.

  5. High capacity low delay packet broadcasting multiaccess schemes for satellite repeater systems

    NASA Astrophysics Data System (ADS)

    Bose, S. K.

    1980-12-01

    Demand assigned packet radio schemes using satellite repeaters can achieve high capacities but often exhibit relatively large delays under low traffic conditions when compared to random access. Several schemes which improve delay performance at low traffic but which have high capacity are presented and analyzed. These schemes allow random acess attempts by users, who are waiting for channel assignments. The performance of these are considered in the context of a multiple point communication system carrying fixed length messages between geographically distributed (ground) user terminals which are linked via a satellite repeater. Channel assignments are done following a BCC queueing discipline by a (ground) central controller on the basis of requests correctly received over a collision type access channel. In TBACR Scheme A, some of the forward message channels are set aside for random access transmissions; the rest are used in a demand assigned mode. Schemes B and C operate all their forward message channels in a demand assignment mode but, by means of appropriate algorithms for trailer channel selection, allow random access attempts on unassigned channels. The latter scheme also introduces framing and slotting of the time axis to implement a more efficient algorithm for trailer channel selection than the former.

  6. Spectroscopy of the UO+2 cation and the delayed ionization of UO2.

    PubMed

    Merritt, Jeremy M; Han, Jiande; Heaven, Michael C

    2008-02-28

    Vibronically resolved spectra for the UO+2 cation have been recorded using the pulsed field ionization zero electron kinetic energy (PFI-ZEKE) technique. For the ground state, long progressions in both the bending and symmetric stretch vibrations were observed. Bend and stretch progressions of the first electronically excited state were also observed, and the origin was found at an energy of 2678 cm(-1) above the ground state zero-point level. This observation is consistent with a recent theoretical prediction [Infante et al., J. Chem. Phys. 127, 124308 (2007)]. The ionization energy for UO2, derived from the PFI-ZEKE spectrum, namely, 6.127(1) eV, is in excellent agreement with the value obtained from an earlier photoionization efficiency measurement. Delayed ionization of UO2 in the gas phase has been reported previously [Han et al., J. Chem. Phys. 120, 5155 (2004)]. Here, we extend the characterization of the delayed ionization process by performing a quantitative study of the ionization rate as a function of the energy above the ionization threshold. The ionization rate was found to be 5 x 10(6) s(-1) at threshold, and increased linearly with increasing energy in the range investigated (0-1200 cm(-1)).

  7. Scanning Raman lidar for tropospheric water vapor profiling and GPS path delay correction

    NASA Astrophysics Data System (ADS)

    Tarniewicz, Jerome; Bock, Olivier; Pelon, Jacques R.; Thom, Christian

    2002-01-01

    The design of a ground based and transportable combined Raman elastic-backscatter lidar for the remote sensing of lower tropospheric water vapor and nitrogen concentration is described. This lidar is intended to be used for an external calibration of the wet path delay of GPS signals. A description of the method used to derive water vapor and nitrogen profiles in the lower troposphere is given. The instrument has been tested during the ESCOMPTE campaign in June 2001 and first measurements are presented.

  8. A Suite of Discriminants for Ground-Truth Mining Events in the Western U.S. and Its Implications for Discrimination Capability in Russia

    DTIC Science & Technology

    2008-09-01

    of up to 1000 individual boreholes is filled with 5000 to 10,000 lbs of material and delay fired over several seconds. The explosive array is...delay-fired mining events using seismic arrays : Application to the PDAR array in Wyoming, USA, Bull. Seism. Soc. Am. 97: pp .989–1001. Arrowsmith...regional seismic stations in monitoring areas of interest, particularly in countries where mining efforts are significant to the economy. As with other

  9. A ground-water-quality monitoring program for Nevada

    USGS Publications Warehouse

    Nowlin, Jon O.

    1986-01-01

    A program was designed for the systematic monitoring of ground-water quality in Nevada. Basic hydrologic and water-quality principles are discussed in the formulation of a rational approach to developing a statewide monitoring program. A review of ground-water monitoring efforts in Nevada through 1977 indicates that few requirements for an effective statewide program are being met. A suggested program has been developed that consists of five major elements: (1) A Background-Quality Network to assess the existing water quality in Nevada aquifers, (2) a Contamination Source Inventory of known or potential threats to ground-water quality, (3) Surveillance Networks to monitor ground-water quality in selected hydrographic areas, (4) Intensive Surveys of individual instances of known or potential ground-water contamination, and (5) Ground-Water Data File to manage data generated by the other monitoring elements. Two indices have been developed to help assign rational priorities for monitoring ground water in the 255 hydrographic areas of Nevada: (1) A Hydrographic-Area Priority Index for surveillance monitoring, and (2) A Development-Potential Index for background monitoring of areas with little or no current development. Requirements for efficient management of data from ground-water monitoring are discussed and the three major systems containing Nevada ground-water data are reviewed. More than 11,000 chemical analyses of ground water have been acquired from existing systems and incorporated into a prototype data base.

  10. Is research ethics regulation really killing people?

    PubMed

    Hunter, David

    2015-04-06

    It has been argued that research ethics regulation is leading to loss of life by delaying life-saving research. For example, Whitney and Schneider argue that the delays to the ISIS-2 trial cost 6538 lives. This suggests that there are grounds for rejecting research ethics regulation. However, the methods adopted by critics are flawed because: they conflate regulatory delays with those due to genuine normative requirements that would be present even if the regulatory framework was not; and looking at the impact of regulation on a per-project basis is the wrong metric, because it neglects all the unsuccessful research and because delaying specific projects does not reduce the overall research done by researchers. Research ethics regulation does not lead to substantial losses of life, but we have strong obligations to make it as efficient as possible.

  11. Mobile Communication Via Satellite

    NASA Technical Reports Server (NTRS)

    Yan, Tsun-Yee; Naderi, Firouz M.

    1988-01-01

    System mixes real-time and delayed-transmission channels. Combination of L-band and SHF links connect fixed and mobile equipment on ground to satellite relay. Software and hardware architecture conforms structure of open-system-interconnection model suggested by International Standards Organization.

  12. Test Report Emission Test Program EPA Information Collection Request for Delayed Coking Units 736 Coker Unit

    EPA Pesticide Factsheets

    ARI Environmental, Inc. (ARI) was retained by Houston Refining LP (HRO) to conduct an emission test program at their refinery located in Houston, Texas. The testing was conducted on on the 736 Delayed Coking Unit (DCU) in response to EPA's ICR.

  13. An application of high authority/low authority control and positivity

    NASA Technical Reports Server (NTRS)

    Seltzer, S. M.; Irwin, D.; Tollison, D.; Waites, H. B.

    1988-01-01

    Control Dynamics Company (CDy), in conjunction with NASA Marshall Space Flight Center (MSFC), has supported the U.S. Air Force Wright Aeronautical Laboratory (AFWAL) in conducting an investigation of the implementation of several DOD controls techniques. These techniques are to provide vibration suppression and precise attitude control for flexible space structures. AFWAL issued a contract to Control Dynamics to perform this work under the Active Control Technique Evaluation for Spacecraft (ACES) Program. The High Authority Control/Low Authority Control (HAC/LAC) and Positivity controls techniques, which were cultivated under the DARPA Active Control of Space Structures (ACOSS) Program, were applied to a structural model of the NASA/MSFC Ground Test Facility ACES configuration. The control systems design were accomplished and linear post-analyses of the closed-loop systems are provided. The control system designs take into account effects of sampling and delay in the control computer. Nonlinear simulation runs were used to verify the control system designs and implementations in the facility control computers. Finally, test results are given to verify operations of the control systems in the test facility.

  14. Comparison of Some Blast Vibration Predictors for Blasting in Underground Drifts and Some Observations

    NASA Astrophysics Data System (ADS)

    Bhagwat, Vaibhab Pramod; Dey, Kaushik

    2016-04-01

    Drilling and blasting are the most economical excavation techniques in underground drifts driven through hard rock formation. Burn cut is the most popular drill pattern, used in this case, to achieve longer advance per blast round. The ground vibration generated due to the propagation of blast waves on the detonation of explosive during blasting is the principal cause for structural and rock damage. Thus, ground vibration is a point of concern for the blasting engineers. The ground vibration from a blast is measured using a seismograph placed at the blast monitoring station. The measured vibrations, in terms of peak particle velocity, are related to the maximum charge detonated at one instant and the distance of seismograph from the blast point. The ground vibrations from a number of blast rounds of varying charge/delay and distances are monitored. A number of scaling factors of these dependencies (viz. Distance and maximum charge/delay) have been proposed by different researchers, namely, square root, cube root, CMRI, Langefors and Kihlstrom, Ghosh-Daemon, Indian standard etc. Scaling factors of desired type are computed for all the measured blast rounds. Regression analysis is carried out between the scaling factors and peak particle velocities to establish the coefficients of the vibration predictor equation. Then, the developed predictor equation is used for designing the blast henceforth. Director General of Mine Safety, India, specified that ground vibrations from eight to ten blast rounds of varying charge/delay and distances should be monitored to develop a predictor equation; however, there is no guideline about the type of scaling factor to be used. Further to this, from the statistical point of view, a regression analysis on a small sample population cannot be accepted without the testing of hypothesis. To show the importance of the above, in this paper, seven scaling factors are considered for blast data set of a hard-rock underground drift using burn-cut blast design. The possible step by step approach to establish a vibration predictor equation is also proposed.

  15. The influence of changing seasonality and snow cover on arctic ground squirrel phenology.

    NASA Astrophysics Data System (ADS)

    Barnes, B.; Sheriff, M.; Kenagy, J.; Buck, L.; Team Squirrel

    2011-12-01

    A warming climate in the Arctic may have asymmetrical effects on seasonality, depending on the timing and extent of snow cover. Warm autumns that delay the onset of persistent snow cover will lengthen growing seasons of some plants and, combined with continuing access to fallen seeds, berries, and leaves, extend feeding opportunities for ground foragers. Warming in spring should advance when the ground becomes snow free and the onset of plant productivity, leading overall to a longer growing season. However, if winter and spring precipitation increase, as is predicted in climate models, the amount and seasonal extent of snow pack will increase, which will delay melt and lead to delayed springs. Either of these scenarios may develop regionally, depending on local weather, snow, and wind. Since 1996, we have been investigating the timing of annual events in natural populations of arctic ground squirrels, Urocitellus parryii, living at two nearby sites (Toolik and Atigun, 68o38'N) in arctic Alaska that greatly differ in timing and duration of snow cover. Since arctic ground squirrels are highly dependent on snow free ground for foraging, we predicted that these environmental differences will have had major impacts on life histories and timing of annual events on the local populations. Precision in dates of the beginning and end of hibernation, use of heterothermy, and birth of young were determined by temperature-sensitive data loggers implanted into juvenile and adult animals of both sexes. Weather stations, snow cameras, and transects for plant phenology are in place at both locations, although record lengths differ. While across the past 15 years annual timing of hibernation and breeding has not shown significant trends at either site, the two populations have differed consistently in hibernation timing and length of active season, and they show a 13 day difference in average timing of reproduction. These results reveal a substantial flexibility of timing of the annual cycle in ground squirrel populations in response to local conditions. Current trends of change in weather show an increase in active season temperatures at Atigun but snowier springs at Toolik. We predict that if these trends continue, further separation in annual timing will develop between the two populations with negative impacts on survival and population density at Toolik and positive impacts at Atigun. In addition, to test for the pace of additional flexibility and gender specific differences in annual timing, we have begun a food addition experiment at Atigun that extends foraging opportunities in autumn.

  16. Marine stratus initiative at San Francisco International Airport

    DOT National Transportation Integrated Search

    1996-06-25

    San Francisco International Airport is one of the busiest airports in the United States and one of the highest delay airports in terms of total aircraft delay hours and number of imposed air traffic delay programs. May through September, weather fore...

  17. Protective effects of middle school comprehensive sex education with family involvement.

    PubMed

    Grossman, Jennifer M; Tracy, Allison J; Charmaraman, Linda; Ceder, Ineke; Erkut, Sumru

    2014-11-01

    School-based comprehensive sex education programs can reduce early adolescents' risky sexual behavior. The purpose of this study was to assess the effectiveness of a 3-year comprehensive sex education program in delaying vaginal sex for middle school students and whether the family component of the intervention contributes to its effectiveness. This longitudinal evaluation followed a cohort of 6th graders (N = 2453) through the end of 8th grade. The design used random assignment of 24 schools into treatment and comparison conditions. The analysis included multiple-group logistic regression to assess differences in delay of sex between intervention and comparison groups. In schools where the program was taught, 16% fewer boys and 15% fewer girls had had sex by the end of 8th grade compared to boys and girls at comparison schools. Completing family activities during the first year of the program predicted delayed sexual debut for boys. Theory-based, developmentally appropriate, comprehensive sex education programs that include parent involvement can be effective in delaying vaginal sex for middle school students. Parent involvement is particularly important for boys, as family activities may encourage parents to talk with their sons earlier and more frequently. © 2014, American School Health Association.

  18. Postural adjustment errors reveal deficits in inhibition during lateral step initiation in older adults

    PubMed Central

    Fuhrman, Susan I.; Redfern, Mark S.; Jennings, J. Richard; Perera, Subashan; Nebes, Robert D.; Furman, Joseph M.

    2013-01-01

    Postural dual-task studies have demonstrated effects of various executive function components on gait and postural control in older adults. The purpose of the study was to explore the role of inhibition during lateral step initiation. Forty older adults participated (range 70–94 yr). Subjects stepped to the left or right in response to congruous and incongruous visual cues that consisted of left and right arrows appearing on left or right sides of a monitor. The timing of postural adjustments was identified by inflection points in the vertical ground reaction forces (VGRF) measured separately under each foot. Step responses could be classified into preferred and nonpreferred step behavior based on the number of postural adjustments that were made. Delays in onset of the first postural adjustment (PA1) and liftoff (LO) of the step leg during preferred steps progressively increased among the simple, choice, congruous, and incongruous tasks, indicating interference in processing the relevant visuospatial cue. Incongruous cues induced subjects to make more postural adjustments than they typically would (i.e., nonpreferred steps), representing errors in selection of the appropriate motor program. During these nonpreferred steps, the onset of the PA1 was earlier than during the preferred steps, indicating a failure to inhibit an inappropriate initial postural adjustment. The functional consequence of the additional postural adjustments was a delay in the LO compared with steps in which they did not make an error. These results suggest that deficits in inhibitory function may detrimentally affect step decision processing, by delaying voluntary step responses. PMID:23114211

  19. Pulsar B0329+54: scattering disk resolved by RadioAstron interferometer at 324 MHz

    NASA Astrophysics Data System (ADS)

    Popov, M.

    Propagation of pulsar radio emission through the interstellar plasma is accompanied with scattering by inhomogeneities of the plasma. The scattering produces a range of effects: angular broadening, pulse broadening, intensity modulation (scintillations), and distortion of radio spectra (diffraction pattern). In this presentation, we will primarily deal with scattering effects affecting interferometric measurements. Pulsars are point like radio sources at angular resolution provided by space VLBI even at largest baseline projections. Therefore, any structure, observed by the space-ground interferometer, is due to scattering effects. The objective of our study was to measure parameters of a scattering disk for the PSR B0329+54 at a frequency of 324 MHz with the space-ground interferometer RadioAstron. Observations were conducted on November 26-29 2012 in four sessions, one hour duration each, with progressively increasing baseline projections of 70, 90,175, and 235 thousand kilometers correspondingly. Only one ground radio telescope observed the pulsar together with the space radio telescope (SRT); it was 100-m telescope in Green Bank (GBT). Notable visibility amplitudes were detected at all baseline projections at a maximum level of 0.05 with the SNR of about 20. It was found that visibility function in delay consists of many isolated unresolved spikes. The overall spread of such spikes in delay corresponds to the scattering disk of about 4 mas at a half wide. Fine structure of the visibility amplitude in delay domain corresponds to a model of amplitude modulated noise (AMN). Fringe rate behavior with time indicates on dominant influence of refraction on traveling ionospheric disturbances (TID).

  20. Behavioral and psychosocial effects of two middle school sexual health education programs at tenth-grade follow-up.

    PubMed

    Markham, Christine M; Peskin, Melissa F; Shegog, Ross; Baumler, Elizabeth R; Addy, Robert C; Thiel, Melanie; Escobar-Chaves, Soledad Liliana; Robin, Leah; Tortolero, Susan R

    2014-02-01

    An earlier randomized controlled trial found that two middle school sexual education programs-a risk avoidance (RA) program and a risk reduction (RR) program-delayed initiation of sexual intercourse (oral, vaginal, or anal sex) and reduced other sexual risk behaviors in ninth grade. We examined whether these effects extended into 10th grade. Fifteen middle schools were randomly assigned to RA, RR, or control conditions. Follow-up surveys were conducted with participating students in 10th grade (n = 1,187; 29.2% attrition). Participants were 60% female, 50% Hispanic, and 39% black; seventh grade mean age was 12.6 years. In 10th grade, compared with the control condition, both programs significantly delayed anal sex initiation in the total sample (RA: adjusted odds ratio [AOR], .64, 95% confidence interval [CI], .42-.99; RR: AOR, .65, 95% CI, .50-.84) and among Hispanics (RA: AOR, .53, 95% CI, .31-.91; RR: AOR, .82, 95% CI, .74-.93). Risk avoidance students were less likely to report unprotected vaginal sex, either by using a condom or by abstaining from sex (AOR: .61, 95% CI, .45-.85); RR students were less likely to report recent unprotected anal sex (AOR: .34, 95% CI, .20-.56). Both programs sustained positive impact on some psychosocial outcomes. Although both programs delayed anal sex initiation into 10th grade, effects on the delayed initiation of oral and vaginal sex were not sustained. Additional high school sexual education may help to further delay sexual initiation and reduce other sexual risk behaviors in later high school years. Copyright © 2014 Society for Adolescent Health and Medicine. All rights reserved.

  1. Understanding HIV care delays in the US South and the role of the social-level in HIV care engagement/retention: a qualitative study

    PubMed Central

    2014-01-01

    Introduction In a significant geographical shift in the distribution of HIV infection, the US South - comprising 17 states - now has the greatest number of adults and adolescents with HIV (PLHIV) in the nation. More than 60% of PLHIV are not in HIV care in Alabama and Mississippi, contrasted with a national figure of 25%. Poorer HIV outcomes raise concerns about HIV-related inequities for southern PLHIV, which warrant further study. This qualitative study sought to understand experiences of low-income PLHIV on the AIDS Drug Assistance Program in engagement and retention in continuous HIV care in two sites in Alabama. Methods The study was designed using grounded theory. Semi-structured interviews with 25 PLHIV explored experiences with care linkage, reported factors and behaviors affecting engagement/retention in continuous HIV care, including socio-economic factors. To triangulate sources, 25 additional interviews were conducted with health and social service providers from the same clinics and AIDS Service Organizations where clients obtained services. Across the narratives, we used the HIV care continuum to map where care delays and drop out occurred. Using open coding, constant comparison and iterative data collection and analysis, we constructed a conceptual model illustrating how participants described their path to HIV care engagement and retention. Results Most respondents reported delayed HIV care, describing concentric factors: psychological distress, fear, lack of information, substance use, incarceration, lack of food, transport and housing. Stark health system drop out occurred immediately after receipt of HIV test results, with ART initiation generally occurring when individuals became ill. Findings highlight these enablers to care: Alabama's 'social infrastructure'; 'twinning' medical with social services, 'social enablers' who actively link PLHIV to care; and 'enabling spaces' that break down PLHIV isolation, facilitating HIV care linkage/retention. Conclusions Ryan White-funded programs, together with housing, food and psychological support were pre-conditions for participants' entry and retention in HIV care. The path to achieving continuous HIV care for individuals at risk of lack of entry or delayed HIV care requires robust social-level responses, like in Alabama, that address physical and mental health of clients and directly engage the particular social and economic contexts and vulnerabilities of southern PLHIV. PMID:24708752

  2. Molecular alignment effect on the photoassociation process via a pump-dump scheme

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Bin-Bin; Han, Yong-Chang, E-mail: ychan@dlut.edu.cn; Cong, Shu-Lin

    The photoassociation processes via the pump-dump scheme for the heternuclear (Na + H → NaH) and the homonuclear (Na + Na → Na{sub 2}) molecular systems are studied, respectively, using the time-dependent quantum wavepacket method. For both systems, the initial atom pair in the continuum of the ground electronic state (X{sup 1}Σ{sup +}) is associated into the molecule in the bound states of the excited state (A{sup 1}Σ{sup +}) by the pump pulse. Then driven by a time-delayed dumping pulse, the prepared excited-state molecule can be transferred to the bound states of the ground electronic state. It is found thatmore » the pump process can induce a superposition of the rovibrational levels |v, j〉 on the excited state, which can lead to the field-free alignment of the excited-state molecule. The molecular alignment can affect the dumping process by varying the effective coupling intensity between the two electronic states or by varying the population transfer pathways. As a result, the final population transferred to the bound states of the ground electronic state varies periodically with the delay time of the dumping pulse.« less

  3. The 2010 slow slip event and secular motion at Kilauea, Hawai`i inferred from TerraSAR-X InSAR data

    USGS Publications Warehouse

    Chen, Jingyi; Zebker, Howard A.; Segall, Paul; Miklius, Asta

    2014-01-01

    We present here an Small BAseline Subset (SBAS) algorithm to extract both transient and secular ground deformations on the order of millimeters in the presence of tropospheric noise on the order of centimeters, when the transient is of short duration and known time, and the background deformation is smooth in time. We applied this algorithm to study the 2010 slow slip event as well as the secular motion of Kīlauea's south flank using 49 TerraSAR-X images. We also estimate the tropospheric delay variation relative to a given reference pixel using an InSAR SBAS approach. We compare the InSAR SBAS solution for both ground deformation and tropospheric delays with existing GPS measurements and confirm that the ground deformation signal andtropospheric noise in InSAR data are successfully separated. We observe that the coastal region on the south side of the Hilina Pali moves at a higher background rate than the region north side of the Pali. We also conclude that the 2010 SSE displacement is mainly horizontal and the maximum magnitude of the 2010 SSE vertical component is less than 5 mm.

  4. Computer programs for describing the recession of ground-water discharge and for estimating mean ground-water recharge and discharge from streamflow records-update

    USGS Publications Warehouse

    Rutledge, A.T.

    1998-01-01

    The computer programs included in this report can be used to develop a mathematical expression for recession of ground-water discharge and estimate mean ground-water recharge and discharge. The programs are intended for analysis of the daily streamflow record of a basin where one can reasonably assume that all, or nearly all, ground water discharges to the stream except for that which is lost to riparian evapotranspiration, and where regulation and diversion of flow can be considered to be negligible. The program RECESS determines the master reces-sion curve of streamflow recession during times when all flow can be considered to be ground-water discharge and when the profile of the ground-water-head distribution is nearly stable. The method uses a repetitive interactive procedure for selecting several periods of continuous recession, and it allows for nonlinearity in the relation between time and the logarithm of flow. The program RORA uses the recession-curve displacement method to estimate the recharge for each peak in the streamflow record. The method is based on the change in the total potential ground-water discharge that is caused by an event. Program RORA is applied to a long period of record to obtain an estimate of the mean rate of ground-water recharge. The program PART uses streamflow partitioning to estimate a daily record of base flow under the streamflow record. The method designates base flow to be equal to streamflow on days that fit a requirement of antecedent recession, linearly interpolates base flow for other days, and is applied to a long period of record to obtain an estimate of the mean rate of ground-water discharge. The results of programs RORA and PART correlate well with each other and compare reasonably with results of the corresponding manual method.

  5. SMSIM--Fortran programs for simulating ground motions from earthquakes: Version 2.0.--a revision of OFR 96-80-A

    USGS Publications Warehouse

    Boore, David M.

    2000-01-01

    A simple and powerful method for simulating ground motions is based on the assumption that the amplitude of ground motion at a site can be specified in a deterministic way, with a random phase spectrum modified such that the motion is distributed over a duration related to the earthquake magnitude and to distance from the source. This method of simulating ground motions often goes by the name "the stochastic method." It is particularly useful for simulating the higher-frequency ground motions of most interest to engineers, and it is widely used to predict ground motions for regions of the world in which recordings of motion from damaging earthquakes are not available. This simple method has been successful in matching a variety of ground-motion measures for earthquakes with seismic moments spanning more than 12 orders of magnitude. One of the essential characteristics of the method is that it distills what is known about the various factors affecting ground motions (source, path, and site) into simple functional forms that can be used to predict ground motions. SMSIM is a set of programs for simulating ground motions based on the stochastic method. This Open-File Report is a revision of an earlier report (Boore, 1996) describing a set of programs for simulating ground motions from earthquakes. The programs are based on modifications I have made to the stochastic method first introduced by Hanks and McGuire (1981). The report contains source codes, written in Fortran, and executables that can be used on a PC. Programs are included both for time-domain and for random vibration simulations. In addition, programs are included to produce Fourier amplitude spectra for the models used in the simulations and to convert shear velocity vs. depth into frequency-dependent amplification. The revision to the previous report is needed because the input and output files have changed significantly, and a number of new programs have been included in the set.

  6. Behavior Problems in Toddlers with and without Developmental Delays: Comparison of Treatment Outcomes

    ERIC Educational Resources Information Center

    Holtz, Casey A.; Carrasco, Jennifer M.; Mattek, Ryan J.; Fox, Robert A.

    2009-01-01

    The purpose of this study is to examine the effectiveness of an in-home parent management program for toddlers with behavior problems and developmental delays by comparing outcomes for a group of toddlers with developmental delays (n = 27) and a group of toddlers without developmental delays (n = 27). The majority of children lived in single…

  7. Parallel runway requirement analysis study. Volume 1: The analysis

    NASA Technical Reports Server (NTRS)

    Ebrahimi, Yaghoob S.

    1993-01-01

    The correlation of increased flight delays with the level of aviation activity is well recognized. A main contributor to these flight delays has been the capacity of airports. Though new airport and runway construction would significantly increase airport capacity, few programs of this type are currently underway, let alone planned, because of the high cost associated with such endeavors. Therefore, it is necessary to achieve the most efficient and cost effective use of existing fixed airport resources through better planning and control of traffic flows. In fact, during the past few years the FAA has initiated such an airport capacity program designed to provide additional capacity at existing airports. Some of the improvements that that program has generated thus far have been based on new Air Traffic Control procedures, terminal automation, additional Instrument Landing Systems, improved controller display aids, and improved utilization of multiple runways/Instrument Meteorological Conditions (IMC) approach procedures. A useful element to understanding potential operational capacity enhancements at high demand airports has been the development and use of an analysis tool called The PLAND_BLUNDER (PLB) Simulation Model. The objective for building this simulation was to develop a parametric model that could be used for analysis in determining the minimum safety level of parallel runway operations for various parameters representing the airplane, navigation, surveillance, and ATC system performance. This simulation is useful as: a quick and economical evaluation of existing environments that are experiencing IMC delays, an efficient way to study and validate proposed procedure modifications, an aid in evaluating requirements for new airports or new runways in old airports, a simple, parametric investigation of a wide range of issues and approaches, an ability to tradeoff air and ground technology and procedures contributions, and a way of considering probable blunder mechanisms and range of blunder scenarios. This study describes the steps of building the simulation and considers the input parameters, assumptions and limitations, and available outputs. Validation results and sensitivity analysis are addressed as well as outlining some IMC and Visual Meteorological Conditions (VMC) approaches to parallel runways. Also, present and future applicable technologies (e.g., Digital Autoland Systems, Traffic Collision and Avoidance System II, Enhanced Situational Awareness System, Global Positioning Systems for Landing, etc.) are assessed and recommendations made.

  8. Dynamic-RAM Data Storage Unit

    NASA Technical Reports Server (NTRS)

    Sturman, J. C.

    1985-01-01

    Dynamic random-access-memory (RAM) data delay and storage unit developed to insure data received from satellite is stored and not lost when satellite is not within range of ground station. Stores 256K of serial data, with independent read and write capability.

  9. Impulsive effects of phase-locked pulse pairs on nuclear motion in the electronic ground state

    NASA Astrophysics Data System (ADS)

    Cina, J. A.; Smith, T. J.

    1993-06-01

    The nonlinear effects of ultrashort phase-locked electronically resonant pulse pairs on the ground state nuclear motion are investigated theoretically. The pulse-pair propagator, momentum impulse, and displacement are determined in the weak field limit for pulse pairs separated by a time delay short on a nuclear time scale. Possible application to large amplitude vibrational excitation of the 104 cm-1 mode of α-perylene is considered and comparisons are made to other Raman excitation methods.

  10. Optimization of MLS receivers for multipath environments

    NASA Technical Reports Server (NTRS)

    Mcalpine, G. A.; Irwin, S. H.; NELSON; Roleyni, G.

    1977-01-01

    Optimal design studies of MLS angle-receivers and a theoretical design-study of MLS DME-receivers are reported. The angle-receiver results include an integration of the scan data processor and tracking filter components of the optimal receiver into a unified structure. An extensive simulation study comparing the performance of the optimal and threshold receivers in a wide variety of representative dynamical interference environments was made. The optimal receiver was generally superior. A simulation of the performance of the threshold and delay-and-compare receivers in various signal environments was performed. An analysis of combined errors due to lateral reflections from vertical structures with small differential path delays, specular ground reflections with neglible differential path delays, and thermal noise in the receivers is provided.

  11. Quick Fix for Managing Risks

    NASA Technical Reports Server (NTRS)

    2002-01-01

    Under a Phase II SBIR contract, Kennedy and Lumina Decision Systems, Inc., jointly developed the Schedule and Cost Risk Analysis Modeling (SCRAM) system, based on a version of Lumina's flagship software product, Analytica(R). Acclaimed as "the best single decision-analysis program yet produced" by MacWorld magazine, Analytica is a "visual" tool used in decision-making environments worldwide to build, revise, and present business models, minus the time-consuming difficulty commonly associated with spreadsheets. With Analytica as their platform, Kennedy and Lumina created the SCRAM system in response to NASA's need to identify the importance of major delays in Shuttle ground processing, a critical function in project management and process improvement. As part of the SCRAM development project, Lumina designed a version of Analytica called the Analytica Design Engine (ADE) that can be easily incorporated into larger software systems. ADE was commercialized and utilized in many other developments, including web-based decision support.

  12. The Positive Impact of Early Intervention for Children with Developmental Delays, Gestational Cocaine Exposure, and Co-Occurring Risk Factors

    ERIC Educational Resources Information Center

    Ullery, Mary Anne; Katz, Lynne

    2017-01-01

    This article examined transition rates of young children (n = 102) from an early intervention program at the Linda Ray Intervention Program (LRIP) who had documented developmental delays and co-occurring prenatal drug exposure often coupled with verified child maltreatment. Findings indicated that there was significant group improvement from…

  13. 78 FR 19098 - Wage Methodology for the Temporary Non-Agricultural Employment H-2B Program; Delay of Effective Date

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-29

    ... by dividing the Bureau of Labor Statistics Occupational Employment Statistics Survey (OES survey... DEPARTMENT OF LABOR Employment and Training Administration 20 CFR Part 655 RIN 1205-AB61 Wage Methodology for the Temporary Non-Agricultural Employment H- 2B Program; Delay of Effective Date AGENCY...

  14. Small Steps: An Early Intervention Program for Children with Developmental Delays.

    ERIC Educational Resources Information Center

    Pieterse, Moira; And Others

    This boxed set includes eight booklets of home activities for early intervention for young children with developmental delays. The first book provides an introduction to the program and its implementation, lists 23 resources, describes a videotape which supplements the booklets, and includes a glossary. Book 2 covers how to select goals for the…

  15. The SAS-3 delayed command system

    NASA Technical Reports Server (NTRS)

    Hoffman, E. J.

    1975-01-01

    To meet the requirements arising from the increased complexity of the power, attitude control and telemetry systems, a full redundant high-performance control section with delayed command capability was designed for the Small Astronomy Satellite-3 (SAS-3). The relay command system of SAS-3 is characterized by 56 bystate relay commands, with capability for handling up to 64 commands in future versions. The 'short' data command service of SAS-1 and SAS-2 consisting of shifting 24-bit words to two users was expanded to five users and augmented with a 'long load' data command service (up to 4080 bits) used to program the telemetry system and the delayed command subsystem. The inclusion of a delayed command service ensures a program of up to 30 relay or short data commands to be loaded for execution at designated times. The design and system operation of the SAS-3 command section are analyzed, with special attention given to the delayed command subsystem.

  16. Effect of a comprehensive health education program on pre-hospital delay intentions in high-risk stroke population and caregivers.

    PubMed

    Yang, Li; Zhao, Qiuli; Zhu, Xuemei; Shen, Xiaoying; Zhu, Yulan; Yang, Liu; Gao, Wei; Li, Minghui

    2017-08-01

    Many factors influence pre-hospital delays in the event of stroke. This study aimed to develop and evaluate a comprehensive educational program for decreasing pre-hospital delays in high-risk stroke population. We enrolled 220 high-risk stroke population and caregivers from six urban communities in Harbin from May 2013 to May 2015, and randomly divided them into intervention and control groups. We implemented a comprehensive educational program (intervention group), comprising public lectures, instructional brochures, case videos, simulations, and role-playing from May 2013 to May 2015. We delivered conventional oral education in the control group. We compared stroke pre-hospital delay behavioral intention (SPDBI), pre-hospital stroke symptom coping test (PSSCT), and stroke pre-symptoms alert test (SPSAT) results between the groups before and 6, 12, and 18 months after health intervention. There were significant differences between before and after intervention (P < 0.01). SPDBI, PSSCT, and SPSAT scores were significantly different between the groups (P < 0.01). The interaction between time and intervention method was significant (P < 0.01). According to multivariate repeated measures analysis of variance, SPDBI, PSSCT, and SPSAT scores were significantly different at each time after intervention (P < 0.05). The comprehensive educational program was significantly effective in decreasing SPDBI, improving knowledge, enhancing stroke pre-symptoms alert, and reducing the possibility of pre-hospital delays.

  17. Tuberculosis related stigma and its effect on the delay for sputum examination under the Revised National Tuberculosis Control Program in India.

    PubMed

    Chakrabartty, Arupkumar; Basu, Pampa; Ali, Kazi Monjur; Sarkar, Aditi Kishore; Ghosh, Debidas

    2018-04-01

    One major barrier to achieve goal of tuberculosis (TB) control program globally, is the stigma attached to the disease. Perceived stigma can delay sputum test in time. Delay will lead to spread of infection in the community. There is no scientific information available in India exactly looking into the association between delay in sputum examination and stigma. We conducted a study in rural West Bengal among persons with cough for 2 weeks or more to assess their level of stigma, its influence on delay for sputum test and identify factors those shape the level of stigma. A community based cross sectional survey was conducted from February to June 2015 in West Bengal, India. We interviewed 135 persons of 15-60 years. Data were collected using a pretested structured questionnaire. Chi-square and logistic regression analysis were done using SPSS 23.0 statistical software. Among the 'lower stigma' group (score 4-24), 'delay' (14-25 days) is found among 46.2% respondents and 'much delay' (26-120 days) among 53.8%. Among the 'higher stigma' (score 25-36) group, 'delay' is found among 20.5% respondents and 'much delay' among 79.5%. Persons with lower stigma are 0.17 times likely to delay than persons with higher stigma [adjusted odds ratio (AOR): 0.17 (0.044-0.668), p=0.011)]. Important influencers of stigma are caste [AOR: 5.90 (1.66-20.90), p=0.006], number of family members [AOR: 3.46 (1.08-11.06), p=0.009] and residence in urban or rural [AOR: 3.97 (1.03-15.27), p=0.045]. Revised National Tuberculosis Control Program in India should de-stigmatize the community giving priorities to lower castes, big families and rural areas. Copyright © 2017 Tuberculosis Association of India. Published by Elsevier B.V. All rights reserved.

  18. Monitoring regional groundwater extraction: the problem.

    PubMed

    Bredehoeft, J D

    2011-01-01

    As hydraulic disturbances (signals) are propagated through a groundwater system two things happen: (1) the higher frequencies in the disturbance are filtered out by the physics of the system and (2) the disturbance takes time to propagate through the system. The filtering and time delays depend on the aquifer diffusivity. This means, for example, if one is observing a water table aquifer at some distance from where annual recharge is occurring, only the long-term average effect of the recharge will be transmitted to the observation point--the system filters out annual variations. These facts have profound impacts on what is feasible to monitor. For example, if one is concerned about the impact of pumping on a spring in a water table aquifer, where the pumping is more than 20 miles or so from the spring, there will be a long delay before the pumping impacts the spring and there will be an equally long delay before a long-term reduction in the pumping regime will restore the spring. The filtering by lower diffusivity groundwater systems makes it impossible to discriminate between the impacts of several major pumpers in the system and/or long-term climate changes. © 2011, The Author(s). Ground Water © 2011, National Ground Water Association.

  19. Shuttle Rocket Motor Program: NASA should delay awarding some construction contracts. Report to the Chair, Subcommittee on Government Activities and Transportation, Committee on Government Operations, House of Representatives

    NASA Technical Reports Server (NTRS)

    1992-01-01

    Even though the executive branch has proposed terminating the Advanced Solid Rocket Motor (ASRM) program, NASA is proceeding with all construction activity planned for FY 1992 to avoid schedule slippage if the program is reinstated by Congress. However, NASA could delay some construction activities for at least a few months without affecting the current launch data schedule. For example, NASA could delay Yellow Creek's motor storage and dock projects, Stennis' dock project, and Kennedy's rotation processing and surge facility and dock projects. Starting all construction activities as originally planned could result in unnecessarily incurring additional costs and termination liability if the funding for FY 1993 is not provided. If Congress decides to continue the program, construction could still be completed in time to avoid schedule slippage.

  20. Factors associated with delayed measles vaccination among children in Shenzhen, China: A case-control study

    PubMed Central

    Lin, Weiyan; Xiong, Yongzhen; Tang, Hao; Chen, Baoli; Ni, Jindong

    2015-01-01

    A delay in the first dose of measles-containing vaccine (MCV1) may contribute to outbreaks of measles, resulting in a high age-specific incidence in infants <1 y of age. To determine the factors associated with delayed MCV1 vaccinations, we used data from the China Information Management System for Immunization Programming. Additionally, the parents/guardians of 430 children whose MCV1 vaccinations were delayed, as well as the parents/guardians of 424 children who received timely vaccinations, were surveyed by telephone. Children were less likely to receive timely MCV1 vaccinations if they belonged to an immigrant group, were male, had poor health status, had a father whose occupation e.g., a manager, had a history of delays in other Expanded Programs on Immunization (EPI) vaccinations, had parents who did not believe vaccinations were important for their children, and experienced shorter travel times to and longer waiting times in EPI clinics. The children of mothers whose occupational status (technician) were more likely to receive timely MCV1 vaccinations. The timeliness of MCV1 vaccinations should be considered as an additional indicator of the quality of vaccination programs. PMID:25668667

  1. Factors associated with delayed measles vaccination among children in Shenzhen, China: a case-control study.

    PubMed

    Lin, Weiyan; Xiong, Yongzhen; Tang, Hao; Chen, Baoli; Ni, Jindong

    2014-01-01

    A delay in the first dose of measles-containing vaccine (MCV1) may contribute to outbreaks of measles, resulting in a high age-specific incidence in infants<1 y of age. To determine the factors associated with delayed MCV1 vaccinations, we used data from the China Information Management System for Immunization Programming. Additionally, the parents/guardians of 430 children whose MCV1 vaccinations were delayed, as well as the parents/guardians of 424 children who received timely vaccinations, were surveyed by telephone. Children were less likely to receive timely MCV1 vaccinations if they belonged to an immigrant group, were male, had poor health status, had a father whose occupation e.g., a manager, had a history of delays in other Expanded Programs on Immunization (EPI) vaccinations, had parents who did not believe vaccinations were important for their children, and experienced shorter travel times to and longer waiting times in EPI clinics. The children of mothers whose occupational status (technician) were more likely to receive timely MCV1 vaccinations. The timeliness of MCV1 vaccinations should be considered as an additional indicator of the quality of vaccination programs.

  2. Sleep Problems and Early Developmental Delay: Implications for Early Intervention Programs

    ERIC Educational Resources Information Center

    Bonuck, Karen; Grant, Roy

    2012-01-01

    Sleep disorders negatively impact behavior, cognition, and growth--the same areas targeted by early intervention. Conversely, developmental delays and disabilities may themselves precipitate sleep disorders. Young children with developmental delays experience sleep disorders at a higher rate than do typically developing children; the most common…

  3. The effect of ICD programming on inappropriate and appropriate ICD Therapies in ischemic and nonischemic cardiomyopathy: the MADIT-RIT trial.

    PubMed

    Sedláček, Kamil; Ruwald, Anne-Christine; Kutyifa, Valentina; McNitt, Scott; Thomsen, Poul Erik Bloch; Klein, Helmut; Stockburger, Martin; Wichterle, Dan; Merkely, Bela; DE LA Concha, Joaquin Fernandez; Swissa, Moshe; Zareba, Wojciech; Moss, Arthur J; Kautzner, Josef; Ruwald, Martin H

    2015-04-01

    The MADIT-RIT trial demonstrated reduction of inappropriate and appropriate ICD therapies and mortality by high-rate cut-off and 60-second-delayed VT therapy ICD programming in patients with a primary prophylactic ICD indication. The aim of this analysis was to study effects of MADIT-RIT ICD programming in patients with ischemic and nonischemic cardiomyopathy. First and total occurrences of both inappropriate and appropriate ICD therapies were analyzed by multivariate Cox models in 791 (53%) patients with ischemic and 707 (47%) patients with nonischemic cardiomyopathy. Patients with ischemic and nonischemic cardiomyopathy had similar incidence of first inappropriate (9% and 11%, P = 0.21) and first appropriate ICD therapy (11.6% and 14.1%, P = 0.15). Patients with ischemic cardiomyopathy had higher mortality rate (6.1% vs. 3.3%, P = 0.01). MADIT-RIT high-rate cut-off (arm B) and delayed VT therapy ICD programming (arm C) compared with conventional (arm A) ICD programming were associated with a significant risk reduction of first inappropriate and appropriate ICD therapy in patients with ischemic and nonischemic cardiomyopathy (HR range 0.11-0.34, P < 0.001 for all comparisons). Occurrence of total inappropriate and appropriate ICD therapies was significantly reduced by high-rate cut-off ICD programming and delayed VT therapy ICD programming in both ischemic and nonischemic cardiomyopathy patients. High-rate cut-off and delayed VT therapy ICD programming are associated with significant reduction in first and total inappropriate and appropriate ICD therapy in patients with ischemic and nonischemic cardiomyopathy. © 2014 Wiley Periodicals, Inc.

  4. User guide for the PULSE program

    USGS Publications Warehouse

    Rutledge, A.T.

    2002-01-01

    This manual describes the use of the PULSE computer program for analysis of streamflow records. The specific instructions included here and the computer files that accompany this manual require streamflow data in a format that can be obtained from U.S. Geological Survey (USGS) sites on the World Wide Web. The program is compiled to run on a personal computer that uses a Microsoft Windows-based operating system. This manual provides instructions for use of Microsoft Excel for plotting hydrographs, though users may choose to use other software for plotting. The program calculates a hydrograph of ground-water discharge to a stream on the basis of user-specified recharge to the water table. Two different formulations allow recharge to be treated as instantaneous quantities or as gradual rates. The process of ground-water evapotranspiration can be approximated as a negative gradual recharge. The PULSE program is intended for analyzing a ground-water-flow system that is characterized by diffuse areal recharge to the water table and ground-water discharge to a stream. Program use can be appropriate if all or most ground water in the basin discharges to the stream and if a streamflow-gaging station at the downstream end of the basin measures all or most outflow. Ground-water pumpage and the regulation and diversion of streamflow should be negligible. More information about the application of the method is included in Rutledge, 1997, pages 2-3. The program can be used in conjunction with ground-water-level data. If a well is open to the surficial aquifer, observed water-level rises in the well can be used to evaluate the timing of recharge. Such evaluation is most effective if there are numerous water-level observation wells in the basin. Water levels in observation wells can also be used to evaluate the rate of ground-water discharge estimated by the PULSE program. The results of such an evaluation may be problematic, however, because the relation between ground-water level and ground-water discharge may not be unique. Departures from the linear model of recession occur because of areal variation in transmissivity and because of the longitudinal component of ground-water flow (parallel to the stream). If the PULSE program is used to estimate ground-water recharge, the recession index should not be obtained from periods of extreme low flow, and the calibration process should include plotting flow on the linear scale in addition to plotting flow on the log scale.

  5. Aviation system capacity : annual report

    DOT National Transportation Integrated Search

    1993-10-01

    The Aviation System Capacity Plan is published annually and, in addition to providing airport delay statistics, serves to identify programs that have potential for increasing capacity and reducing delay.

  6. Operative delay for orthopedic patients on clopidogrel (plavix): a complete lack of consensus.

    PubMed

    Lavelle, William F; Demers Lavelle, Elizabeth A; Uhl, Richard

    2008-04-01

    : Because of its irreversible nature, Plavix (clopidogrel) has become a double edged sword in the care of some of our sickest patients, particularly when surgical intervention is required. Platelets exposed to a single dose of clopidogrel are affected for the remainder of their lifespan and recover normal platelet function at a rate consistent with platelet turnover, which is within 5 days to 7 days (1-3) with the generation of new platelets not influenced by the drug; however, delay of surgical fixation for orthopedic patients, particularly patients with hip fractures may lead to increased morbidity and mortality. : A Web-based survey was created and administered to the program directors of academic orthopedic surgery programs. : Seventy-three percent of orthopedic residency programs responded that waiting 3 days or less for urgent but nonemergent operative interventions on patients on clopidogrel is acceptable with 23% feeling that no delay at all is necessary. For emergent surgery, the vast majority of programs 66 (89%) reported no delay to the operating room for patients on clopidogrel. : The majority of orthopedic surgery residency programs who responded to the survey wait less than 3 days for urgent surgery and do not delay surgery for emergency cases for patients on clopidogrel. At this point we feel that an early intervention that occurs within approximately 2 days, with the acceptance of the possibility of increased blood loss is in the patient's best interest. Based on the reviewed physiology, a perioperative platelet transfusion may be of some benefit as the transfused platelets would be effective in forming a viable plug.

  7. Graphical programming: A systems approach for telerobotic servicing of space assets

    NASA Technical Reports Server (NTRS)

    Pinkerton, James T.; Mcdonald, Michael J.; Palmquist, Robert D.; Patten, Richard

    1994-01-01

    Satellite servicing is in many ways analogous to subsea robotic servicing in the late 1970's. A cost effective, reliable, telerobotic capability had to be demonstrated before the oil companies invested money in deep water robot serviceable production facilities. In the same sense, aeronautic engineers will not design satellites for telerobotic servicing until such a quantifiable capability has been demonstrated. New space servicing systems will be markedly different than existing space robot systems. Past space manipulator systems, including the Space Shuttle's robot arm, have used master/slave technologies with poor fidelity, slow operating speeds and most importantly, in-orbit human operators. In contrast, new systems will be capable of precision operations, conducted at higher rates of speed, and be commanded via ground-control communication links. Challenge presented by this environment include achieving a mandated level of robustness and dependability, radiation hardening, minimum weight and power consumption, and a system which accommodates the inherent communication delay between the ground station and the satellite. There is also a need for a user interface which is easy to use, ensures collision free motions, and is capable of adjusting to an unknown workcell (for repair operations the condition of the satellite may not be known in advance). This paper describes the novel technologies required to deliver such a capability.

  8. The cloud-ionosphere discharge: a newly observed thunderstorm phenomenon.

    PubMed

    Winckler, J R

    1997-09-30

    This paper deals with a luminous electric discharge that forms in the mesospheric region between thundercloud tops and the ionosphere at 90-km altitude. These cloud-ionosphere discharges (CIs), following visual reports dating back to the 19th century, were finally imaged by a low-light TV camera as part of the "SKYFLASH" program at the University of Minnesota in 1989. Many observations were made by various groups in the period 1993-1996. The characteristics of CIs are that they have a wide range of sizes from a few kilometers up to 50 km horizontally; they extend from 40 km to nearly 90 km vertically, with an intense region near 60-70 km and streamers extending down toward cloud tops; the CIs are partly or entirely composed of vertical luminous filaments of kilometer size. The predominate color is red. The TV images show that the CIs usually have a duration less than one TV field (16.7 ms), but higher-speed photometric measurements show that they last about 3 ms, and are delayed 3 ms after an initiating cloud-ground lightning stroke; 95% of these initiating strokes are found to be "positive"-i.e., carry positive charges from clouds to ground. The preference for positive initiating strokes is not understood. Theories of the formation of CIs are briefly reviewed.

  9. Promoting weight control at the worksite: a pilot program of self-motivation using payroll-based incentives.

    PubMed

    Jeffery, R W; Forster, J L; Snell, M K

    1985-03-01

    Thirty-six individuals participated in a worksite weight-loss program in which the central component was a self-motivation program of biweekly payroll deductions refunded contingent on meeting self-selected weight-loss goals. Half were assigned to early treatment and the remainder to a delayed treatment control group. Nine additional individuals also enrolled at the time of delayed treatment and were included in descriptive analyses of factors associated with weight loss. Results showed low program attrition over 6 months (6%) and mean weight losses (12.3 lb) that are competitive with those obtained in clinical settings. Although not different at baseline, participants in the delayed treatment group lost more than twice as much weight as those in the early treatment condition. This difference was interpreted as either a strong seasonal effect or a critical mass effect related to the proportion of employees at the worksite participating in the program. We conclude that self-motivation programs for health behavior change using the payroll system as an organization framework offer a promising new methodology for promoting healthful behaviors in work settings.

  10. The Algorithm Theoretical Basis Document for the Atmospheric Delay Correction to GLAS Laser Altimeter Ranges. Volume 8

    NASA Technical Reports Server (NTRS)

    Herring, Thomas A.; Quinn, Katherine J.

    2012-01-01

    NASA s Ice, Cloud, and Land Elevation Satellite (ICESat) mission will be launched late 2001. It s primary instrument is the Geoscience Laser Altimeter System (GLAS) instrument. The main purpose of this instrument is to measure elevation changes of the Greenland and Antarctic icesheets. To accurately measure the ranges it is necessary to correct for the atmospheric delay of the laser pulses. The atmospheric delay depends on the integral of the refractive index along the path that the laser pulse travels through the atmosphere. The refractive index of air at optical wavelengths is a function of density and molecular composition. For ray paths near zenith and closed form equations for the refractivity, the atmospheric delay can be shown to be directly related to surface pressure and total column precipitable water vapor. For ray paths off zenith a mapping function relates the delay to the zenith delay. The closed form equations for refractivity recommended by the International Union of Geodesy and Geophysics (IUGG) are optimized for ground based geodesy techniques and in the next section we will consider whether these equations are suitable for satellite laser altimetry.

  11. Space Link Extension (SLE) Emulation for High-Throughput Network Communication

    NASA Technical Reports Server (NTRS)

    Murawski, Robert W.; Tchorowski, Nicole; Golden, Bert

    2014-01-01

    As the data rate requirements for space communications increases, significant stress is placed not only on the wireless satellite communication links, but also on the ground networks which forward data from end-users to remote ground stations. These wide area network (WAN) connections add delay and jitter to the end-to-end satellite communication link, effects which can have significant impacts on the wireless communication link. It is imperative that any ground communication protocol can react to these effects such that the ground network does not become a bottleneck in the communication path to the satellite. In this paper, we present our SCENIC Emulation Lab testbed which was developed to test the CCSDS SLE protocol implementations proposed for use on future NASA communication networks. Our results show that in the presence of realistic levels of network delay, high-throughput SLE communication links can experience significant data rate throttling. Based on our observations, we present some insight into why this data throttling happens, and trace the probable issue back to non-optimal blocking communication which is sup-ported by the CCSDS SLE API recommended practices. These issues were presented as well to the SLE implementation developers which, based on our reports, developed a new release for SLE which we show fixes the SLE blocking issue and greatly improves the protocol throughput. In this paper, we also discuss future developments for our end-to-end emulation lab and how these improvements can be used to develop and test future space communication technologies.

  12. Mechanisms of time-based figure-ground segregation.

    PubMed

    Kandil, Farid I; Fahle, Manfred

    2003-11-01

    Figure-ground segregation can rely on purely temporal information, that is, on short temporal delays between positional changes of elements in figure and ground (Kandil, F.I. & Fahle, M. (2001) Eur. J. Neurosci., 13, 2004-2008). Here, we investigate the underlying mechanisms by measuring temporal segregation thresholds for various kinds of motion cues. Segregation can rely on monocular first-order motion (based on luminance modulation) and second-order motion cues (contrast modulation) with a high temporal resolution of approximately 20 ms. The mechanism can also use isoluminant motion with a reduced temporal resolution of 60 ms. Figure-ground segregation can be achieved even at presentation frequencies too high for human subjects to inspect successive frames individually. In contrast, when stimuli are presented dichoptically, i.e. separately to both eyes, subjects are unable to perceive any segregation, irrespective of temporal frequency. We propose that segregation in these displays is detected by a mechanism consisting of at least two stages. On the first level, standard motion or flicker detectors signal local positional changes (flips). On the second level, a segregation mechanism combines the local activities of the low-level detectors with high temporal precision. Our findings suggest that the segregation mechanism can rely on monocular detectors but not on binocular mechanisms. Moreover, the results oppose the idea that segregation in these displays is achieved by motion detectors of a higher order (motion-from-motion), but favour mechanisms sensitive to short temporal delays even without activation of higher-order motion detectors.

  13. Geoengineering Marine Ice Sheets

    NASA Astrophysics Data System (ADS)

    Wolovick, M.

    2017-12-01

    Mass loss from Greenland and Antarctica is highly sensitive to the presence of warm ocean water that drives melting at the grounding line. Rapid melting near the grounding line causes ice shelf thinning, loss of buttressing, flow acceleration, grounding line retreat, and ultimately mass loss and sea-level rise. If the grounding line enters a section of overdeepened bed the ice sheet may even enter a runaway collapse via the marine ice sheet instability. The warm water that triggers this process resides offshore at depth and accesses the grounding line through deep troughs in the continental shelf. In Greenland, warm water transport is further constricted through narrow fjords. Here, I propose blocking warm water transport through these choke points with an artificial sill. Using a simple width- and depth-averaged model of ice stream flow coupled to a buoyant-plume model of ocean melting, I find that grounding line retreat and sea level rise can be delayed or reversed for hundreds of years if warm water is prevented from accessing the grounding line at depth. Blocking of warm water from the sub-ice cavity causes ice shelf thickening, increased buttressing, and grounding line readvance. The increase in buttressing is greatly magnified if the thickened ice shelf regrounds on a bathymetric high or on the artificial sill itself. In some experiments for Thwaites Glacier the grounding line is able to recover from a severely retreated state over 100 km behind its present-day position. Such a dramatic recovery demonstrates that it is possible, at least in principle, to stop and reverse an ongoing marine ice sheet collapse. If the ice shelf regrounds on the artificial sill itself, erosion of the sill beneath the grounded ice could reduce the effectiveness of the intervention. However, experiments including sill erosion suggest that even a very weak sill (1 kPa) could delay a collapse for centuries. The scale of the artificial sills in Greenlandic fjords is comparable to existing large public works, while in Antarctica they are one to two orders of magnitude larger. However, this is still small in comparison to the global disruption that would be caused by a collapse of West Antarctica. Marine-terminating ice streams are high-leverage points in the climate system, where global impacts can be achieved through local intervention.

  14. Parents' Experiences Navigating Intervention Systems for Young Children with Mild Language Delays

    ERIC Educational Resources Information Center

    Marshall, Jennifer; Adelman, Andrea; Kesten, Stacey M.; Natale, Ruby A.; Elbaum, Batya

    2017-01-01

    The purpose of this study was to explore the experiences of parents of children with mild language delays who were referred to an Individuals With Disabilities Education Act (IDEA) birth-to-3 or preschool program, were determined not eligible for services, and were referred on to a community-based program for short-term speech-language therapy.…

  15. The Effects of Social Skills Groups for Young Children with Social Delays

    ERIC Educational Resources Information Center

    Koyama, Takanori

    2011-01-01

    This study was conducted as a program evaluation of an existing social skills program. A review of literature identified a limited number of empirical studies on group-based social skills training for young children with social delays. The purpose of this study was to examine the effects of social skills groups as well as the effects of homework…

  16. Study of Enlistment Test Scores and Other Attrition Factors from the Navy’s Delayed Entry Program

    DTIC Science & Technology

    2009-03-01

    fiscal years 1999 through 2008 and were provided by the Defense Manpower Data Center (DMDC). Men and women were analyzed separately because of...years 1999 through 2008 and were provided by the Defense Manpower Data Center (DMDC). Men and women were analyzed separately because of historic...ANALYSIS OF DELAYED ENTRY PROGRAM ATTRITION BY WOMEN

  17. 340B Drug Pricing Program Ceiling Price and Manufacturer Civil Monetary Penalties Regulation. Final rule; further delay of effective date.

    PubMed

    2017-05-19

    The Health Resources and Services Administration (HRSA) administers section 340B of the Public Health Service Act (PHSA), referred to as the "340B Drug Pricing Program" or the "340B Program." HRSA published a final rule on January 5, 2017, that set forth the calculation of the ceiling price and application of civil monetary penalties. The final rule applied to all drug manufacturers that are required to make their drugs available to covered entities under the 340B Program. In accordance with a January 20, 2017, memorandum from the Assistant to the President and Chief of Staff, entitled "Regulatory Freeze Pending Review," HRSA issued an interim final rule that delayed the effective date of the final rule published in the Federal Register (82 FR 1210, (January 5, 2017)) to May 22, 2017. HHS invited commenters to provide their views on whether a longer delay of the effective date to October 1, 2017, would be more appropriate. After consideration of the comments received on the interim final rule, HHS is delaying the effective date of the January 5, 2017 final rule, to October 1, 2017.

  18. 40 CFR 144.87 - How does the identification of ground water protection areas and other sensitive ground water...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 23 2014-07-01 2014-07-01 false How does the identification of ground water protection areas and other sensitive ground water areas affect me? 144.87 Section 144.87 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM Requirements for...

  19. 40 CFR 144.87 - How does the identification of ground water protection areas and other sensitive ground water...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 24 2013-07-01 2013-07-01 false How does the identification of ground water protection areas and other sensitive ground water areas affect me? 144.87 Section 144.87 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM Requirements for...

  20. 40 CFR 144.87 - How does the identification of ground water protection areas and other sensitive ground water...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false How does the identification of ground water protection areas and other sensitive ground water areas affect me? 144.87 Section 144.87 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM Requirements for...

  1. 40 CFR 144.87 - How does the identification of ground water protection areas and other sensitive ground water...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 23 2011-07-01 2011-07-01 false How does the identification of ground water protection areas and other sensitive ground water areas affect me? 144.87 Section 144.87 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM Requirements for...

  2. 40 CFR 144.87 - How does the identification of ground water protection areas and other sensitive ground water...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 24 2012-07-01 2012-07-01 false How does the identification of ground water protection areas and other sensitive ground water areas affect me? 144.87 Section 144.87 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM Requirements for...

  3. Experimental study on performance of outdoor ground materials in aspect of surface temperature by constant field experiment in subtropical climate city

    NASA Astrophysics Data System (ADS)

    Xi, T. Y.; Ding, J. H.; Lv, X. W.; Lei, Y. S.

    2018-06-01

    In order to create a comfortable building thermal environment, it is important to study the outdoor ground materials performance. In this article, we carried out a constant field experiment in Guangzhou, China, studying on the variations of the surface temperature of three common outdoor building materials: concrete, pavement and grass. We put the equipment on six experiment points respectively to measure the ground surface temperature constantly. The result shows that because of the specific heat capacity, both concrete and pavement have an obvious time delay during their temperature decrease when the grass ground has almost no time delay. And when in the same conditions (exposed to sunlight all day), the material with a low specific heat capacity has a more sensitive variation in temperature. The lower the specific capacity is, the steeper the variation trend of the surface temperature will be. So compared with concrete, the pavement brick ground with a low specific heat capacity has a higher surface temperature in daytime and a lower temperature in the late night time. When in different conditions (different time exposed to sunlight), the temperature value is proportional to the time exposed to the sunlight between the same materials. The concrete exposed to sunlight all day has the highest temperature when the shaded one has the lowest. This experiment reveals that both specific heat capacity and the exposed time to sunlight has a strong influence on the surface temperature of outdoor materials. In subtropical region, the materials with a higher specific heat capacity and a less time exposed to sunlight may be more beneficial to the building thermal environment.

  4. Comparison of the KSC-ER Cloud-to-Ground Lightning Surveillance System (CGLSS) and the U.S. National Lightning Detection Network (NLDN)

    NASA Technical Reports Server (NTRS)

    Ward, Jennifer G.; Cummins, Kenneth L.; Krider, E. Philip

    2008-01-01

    The NASA Kennedy Space Center (KSC) and Air Force Eastern Range (ER) are located in a region of Florida that experiences the highest area density of lightning strikes to ground in the United States, with values approaching 16 fl/km 2/yr when accumulated in 10x10 km (100 sq km) grids (see Figure 1). Consequently, the KSC-ER use data derived from two cloud-to-ground (CG) lightning detection networks to detect hazardous weather, the "Cloud-to-Ground Lightning Surveillance System" (CGLSS) that is owned and operated by the Air Force and the U.S. National Lightning Detection Network (NLDN) that is owned and operated by Vaisala, Inc. These systems are used to provide lightning warnings for ground operations and to insure mission safety during space launches at the KSC-ER. In order to protect the rocket and shuttle fleets, NASA and the Air Force follow a set of lightning safety guidelines that are called the Lightning Launch Commit Criteria (LLCC). These rules are designed to insure that vehicles are not exposed to the hazards of natural or triggered lightning that would in any way jeopardize a mission or cause harm to the shuttle astronauts. Also, if any CG lightning strikes too close to a vehicle on a launch pad, it can cause time-consuming mission delays due to the extensive retests that are often required for vehicles and/or payloads when this occurs. If any CG lightning strike is missed or mis-located by even a small amount, the result could have significant safety implications, require expensive retests, or create unnecessary delays or scrubs in launches. Therefore, it is important to understand the performance of each lightning detection system in considerable detail.

  5. Controlling state explosion during automatic verification of delay-insensitive and delay-constrained VLSI systems using the POM verifier

    NASA Technical Reports Server (NTRS)

    Probst, D.; Jensen, L.

    1991-01-01

    Delay-insensitive VLSI systems have a certain appeal on the ground due to difficulties with clocks; they are even more attractive in space. We answer the question, is it possible to control state explosion arising from various sources during automatic verification (model checking) of delay-insensitive systems? State explosion due to concurrency is handled by introducing a partial-order representation for systems, and defining system correctness as a simple relation between two partial orders on the same set of system events (a graph problem). State explosion due to nondeterminism (chiefly arbitration) is handled when the system to be verified has a clean, finite recurrence structure. Backwards branching is a further optimization. The heart of this approach is the ability, during model checking, to discover a compact finite presentation of the verified system without prior composition of system components. The fully-implemented POM verification system has polynomial space and time performance on traditional asynchronous-circuit benchmarks that are exponential in space and time for other verification systems. We also sketch the generalization of this approach to handle delay-constrained VLSI systems.

  6. Effect of the Children's Health Activity Motor Program on Motor Skills and Self-Regulation in Head Start Preschoolers: An Efficacy Trial.

    PubMed

    Robinson, Leah E; Palmer, Kara K; Bub, Kristen L

    2016-01-01

    Self-regulatory skills are broadly defined as the ability to manage emotions, focus attention, and inhibit some behaviors while activating others in accordance with social expectations and are an established indicator of academic success. Growing evidence links motor skills and physical activity to self-regulation. This study examined the efficacy of a motor skills intervention (i.e., the Children's Health Activity Motor Program, CHAMP) that is theoretically grounded in Achievement Goal Theory on motor skill performance and self-regulation in Head Start preschoolers. A sample of 113 Head Start preschoolers (Mage = 51.91 ± 6.5 months; 49.5% males) were randomly assigned to a treatment (n = 68) or control (n = 45) program. CHAMP participants engaged in 15, 40-min sessions of a mastery climate intervention that focused on the development of motor skills over 5 weeks while control participants engaged in their normal outdoor recess period. The Delay of Gratification Snack Task was used to measure self-regulation and the Test of Gross Motor Development-2nd Edition was used to assess motor skills. All measures were assessed prior to and following the intervention. Linear mixed models were fit for both self-regulation and motor skills. Results revealed a significant time × treatment interaction (p < 0.001). In regard to motor skills, post hoc comparisons found that all children improved their motor skills (p < 0.05), but the CHAMP group improved significantly more than the control group (p < 0.001). Children in CHAMP maintained their self-regulation scores across time, while children in the control group scored significantly lower than the CHAMP group at the posttest (p < 0.05). CHAMP is a mastery climate movement program that enhance skills associated with healthy development in children (i.e., motor skills and self-regulation). This efficacy trial provided evidence that CHAMP helped maintain delay of gratification in preschool age children and significantly improved motor skills while participating in outdoor recess was not effective. CHAMP could help contribute to children's learning-related skills and physical development and subsequently to their academic success.

  7. EFFECT OF SIMAZINE ON MALE REPRODUCTIVE DEVELOPMENT IN THE RAT

    EPA Science Inventory

    The chlorotriazine herbicides, such as atrazine, are used extensively in the United States each year. Chlorotriazine metabolites, as well as the parent compounds, have been detected in surface and ground water in areas of major usage. Previously, we found that atrazine delayed ...

  8. Differentiation of Dictyostelium discoideum vegetative cells into spores during earth orbit in space

    NASA Astrophysics Data System (ADS)

    Takahashi, A.; Ohnishi, K.; Takahashi, S.; Masukawa, M.; Sekikawa, K.; Amano, T.; Nakano, T.; Nagaoka, S.; Ohnishi, T.

    2001-01-01

    We reported previously that emerged amoebae of Dictyosterium ( D.) discoideum grew, aggregated and differentiated to fruiting bodies with normal morphology in space. Here, we investigated the effects of space radiation and/or microgravity on the number, viability, kinetics of germination, growth rate and mutation frequency of spores formed in space in a radiation-sensitive strain, γs13, and the parental strain, NC4. In γs13, there were hardly spores in the fruiting bodies formed in space. In NC4, we found a decrease in the number of spores, a delay in germination of the spores and delayed start of cell growth of the spores formed in space when compared to the ground control. However, the mutation frequency of the NC4 spores formed in space was similar to that of the ground control. We conclude that the depression of spore formation might be induced by microgravity and/or space radiation through the depression of some stage(s) of DNA repair during cell differentiation in the slime mold.

  9. An intelligent position-specific training system for mission operations

    NASA Technical Reports Server (NTRS)

    Schneider, M. P.

    1992-01-01

    Marshall Space Flight Center's (MSFC's) payload ground controller training program provides very good generic training; however, ground controller position-specific training can be improved by including position-specific training systems in the training program. This report explains why MSFC needs to improve payload ground controller position-specific training. The report describes a generic syllabus for position-specific training systems, a range of system designs for position-specific training systems, and a generic development process for developing position-specific training systems. The report also describes a position-specific training system prototype that was developed for the crew interface coordinator payload operations control center ground controller position. The report concludes that MSFC can improve the payload ground controller training program by incorporating position-specific training systems for each ground controller position; however, MSFC should not develop position-specific training systems unless payload ground controller position experts will be available to participate in the development process.

  10. Duke University's Quality Appearance Program

    ERIC Educational Resources Information Center

    Jackson, Joe

    2008-01-01

    The Grounds Services Unit at Duke University has implemented a new program that involves a process of self evaluation, which embraces the concept of perpetual and continuous improvement. The Quality Appearance Program (QAP) embellishes and expands upon the Quality Assurance Program concept, but with a twist to grounds management improvement…

  11. Reducing process delays for real-time earthquake parameter estimation - An application of KD tree to large databases for Earthquake Early Warning

    NASA Astrophysics Data System (ADS)

    Yin, Lucy; Andrews, Jennifer; Heaton, Thomas

    2018-05-01

    Earthquake parameter estimations using nearest neighbor searching among a large database of observations can lead to reliable prediction results. However, in the real-time application of Earthquake Early Warning (EEW) systems, the accurate prediction using a large database is penalized by a significant delay in the processing time. We propose to use a multidimensional binary search tree (KD tree) data structure to organize large seismic databases to reduce the processing time in nearest neighbor search for predictions. We evaluated the performance of KD tree on the Gutenberg Algorithm, a database-searching algorithm for EEW. We constructed an offline test to predict peak ground motions using a database with feature sets of waveform filter-bank characteristics, and compare the results with the observed seismic parameters. We concluded that large database provides more accurate predictions of the ground motion information, such as peak ground acceleration, velocity, and displacement (PGA, PGV, PGD), than source parameters, such as hypocenter distance. Application of the KD tree search to organize the database reduced the average searching process by 85% time cost of the exhaustive method, allowing the method to be feasible for real-time implementation. The algorithm is straightforward and the results will reduce the overall time of warning delivery for EEW.

  12. Detection of ground motions using high-rate GPS time-series

    NASA Astrophysics Data System (ADS)

    Psimoulis, Panos A.; Houlié, Nicolas; Habboub, Mohammed; Michel, Clotaire; Rothacher, Markus

    2018-05-01

    Monitoring surface deformation in real-time help at planning and protecting infrastructures and populations, manage sensitive production (i.e. SEVESO-type) and mitigate long-term consequences of modifications implemented. We present RT-SHAKE, an algorithm developed to detect ground motions associated with landslides, sub-surface collapses, subsidences, earthquakes or rock falls. RT-SHAKE detects first transient changes in individual GPS time series before investigating for spatial correlation(s) of observations made at neighbouring GPS sites and eventually issue a motion warning. In order to assess our algorithm on fast (seconds to minute), large (from 1 cm to meters) and spatially consistent surface motions, we use the 1 Hz GEONET GNSS network data of the Tohoku-Oki MW9.0 2011 as a test scenario. We show the delay of detection of seismic wave arrival by GPS records is of ˜10 seconds with respect to an identical analysis based on strong-motion data and this time delay depends on the level of the time-variable noise. Nevertheless, based on the analysis of the GPS network noise level and ground motion stochastic model, we show that RT-SHAKE can narrow the range of earthquake magnitude, by setting a lower threshold of detected earthquakes to MW6.5-7, if associated with a real-time automatic earthquake location system.

  13. The advanced orbiting systems testbed program: Results to date

    NASA Technical Reports Server (NTRS)

    Newsome, Penny A.; Otranto, John F.

    1993-01-01

    The Consultative Committee for Space Data Systems Recommendations for Packet Telemetry and Advanced Orbiting Systems (AOS) propose standard solutions to data handling problems common to many types of space missions. The Recommendations address only space/ground and space/space data handling systems. Goddard Space Flight Center's AOS Testbed (AOST) Program was initiated to better understand the Recommendations and their impact on real-world systems, and to examine the extended domain of ground/ground data handling systems. Central to the AOST Program are the development of an end-to-end Testbed and its use in a comprehensive testing program. Other Program activities include flight-qualifiable component development, supporting studies, and knowledge dissemination. The results and products of the Program will reduce the uncertainties associated with the development of operational space and ground systems that implement the Recommendations. The results presented in this paper include architectural issues, a draft proposed standardized test suite and flight-qualifiable components.

  14. Assessing "First Mile" Supply Chain Factors Affecting Timeliness of School-Based Deworming Interventions: Supply and Logistics Performance Indicators.

    PubMed

    Koporc, Kimberly M; Strunz, Eric; Holloway, Cassandra; Addiss, David G; Lin, William

    2015-12-01

    Between 2007 and 2012, Children Without Worms (CWW) oversaw the Johnson & Johnson (J&J) donation of Vermox (mebendazole) for treatment of school-age children to control soil-transmitted helminthiasis (STH). To identify factors associated with on-time, delayed, or missed mass drug administration (MDA) interventions, and explore possible indicators for supply chain performance for drug donation programs, we reviewed program data for the 14 STH-endemic countries CWW supported during 2007-2012. Data from drug applications, shipping records, and annual treatment reports were tracked using Microsoft Excel. Qualitative data from interviews with key personnel were used to provide additional context on the causes of delayed or missed MDAs. Four possible contributory factors to delayed or missed MDAs were considered: production, shipping, customs clearance, and miscellaneous in-country issues. Coverage rates were calculated by dividing the number of treatments administered by the number of children targeted during the MDA. Of the approved requests for 78 MDAs, 54 MDAs (69%) were successfully implemented during or before the scheduled month. Ten MDAs (13%) were classified as delayed; seven of these were delayed by one month or less. An additional 14 MDAs (18%) were classified as missed. For the 64 on-time or delayed MDAs, the mean coverage was approximately 88%. To continue to assess the supply chain processes and identify areas for improvement, we identified four indicators or metrics for supply chain performance that can be applied across all neglected tropical disease (NTD) drug donation programs: (1) donor having available inventory to satisfy the country request for donation; (2) donor shipping the approved number of doses; (3) shipment arriving at the Central Medical Stores one month in advance of the scheduled MDA date; and (4) country programs implementing the MDA as scheduled.

  15. GWERD CAFO Research Program – CAFO Impacts on Ground Water Quality

    EPA Science Inventory

    An overview of several projects will be presented on a research program currently underway at ORD’s Ground Water and Ecosystems Restoration Division (GWERD) to evaluate CAFO impacts on ground water quality. The overall research objectives are to characterize the potential for gro...

  16. Assessing the Effects of the "McGraw Hill Phonemic Awareness" Program with Preschool Children with Developmental Delays: A Case Study

    ERIC Educational Resources Information Center

    Isakson, Lisa; Marchand-Martella, Nancy; Martella, Ronald C.

    2011-01-01

    This study assessed the effects of "McGraw Hill Phonemic Awareness" on the phonemic awareness skills of 5 preschool children with developmental delays. The children received 60 of the 110 lessons included in this program over 5 months. They were pre- and posttested using the kindergarten level Initial Sound Fluency and Phoneme…

  17. Flying-qualities criteria for wings-level-turn maneuvering during an air-to-ground weapon delivery task

    NASA Technical Reports Server (NTRS)

    Sammonds, R. I.; Bunnell, J. W.

    1981-01-01

    A moving base simulator experiment demonstrated that a wings-level-turn control mode improved flying qualities for air to ground weapon delivery compared with those of a conventionally controlled aircraft. Evaluations of criteria for dynamic response for this system have shown that pilot ratings correlate well on the basis of equivalent time constant of the initial response. Ranges of this time constant, as well as digital system transport delays and lateral acceleration control authorities that encompassed level 1 through 3 handling qualities, were determined.

  18. Criteria for Side-Force Control in Air-to-Ground Target Acquisition and Tracking

    NASA Technical Reports Server (NTRS)

    Sammonds, Robert I.; McNeill, Walter E.; Bunnell, John W.

    1982-01-01

    A moving-base simulator experiment conducted at Ames Research Center demonstrated that a wings-level-turn control mode improved flying qualities for air-to-ground weapons delivery compared with those of a conventional aircraft. Evaluations of criteria for dynamic response for this system have shown that pilot ratings correlate well with equivalent time constant of the initial response and with system bandwidth. Ranges of this time constant, as well as digital-system transport delays and lateral-acceleration control authorities that encompassed level 1 through level 3 handling qualities, were determined.

  19. F-14 modeling study

    NASA Technical Reports Server (NTRS)

    Levison, William H.

    1988-01-01

    This study explored application of a closed loop pilot/simulator model to the analysis of some simulator fidelity issues. The model was applied to two data bases: (1) a NASA ground based simulation of an air-to-air tracking task in which nonvisual cueing devices were explored, and (2) a ground based and inflight study performed by the Calspan Corporation to explore the effects of simulator delay on attitude tracking performance. The model predicted the major performance trends obtained in both studies. A combined analytical and experimental procedure for exploring simulator fidelity issues is outlined.

  20. Preparations for Global Precipitation Measurement(GPM)Ground Validation

    NASA Technical Reports Server (NTRS)

    Bidwell, S. W.; Bibyk, I. K.; Duming, J. F.; Everett, D. F.; Smith, E. A.; Wolff, D. B.

    2004-01-01

    The Global Precipitation Measurement (GPM) program is an international partnership led by the National Aeronautics and Space Administration (NASA) and the Japan Aerospace Exploration Agency (JAXA). GPM will improve climate, weather, and hydro-meterorological forecasts through more frequent and more accurate measurement of precipitation across the globe. This paper describes the concept and the preparations for Ground Validation within the GPM program. Ground Validation (GV) plays a critical role in the program by investigating and quantitatively assessing the errors within the satellite retrievals. These quantitative estimates of retrieval errors will assist the scientific community by bounding the errors within their research products. The two fundamental requirements of the GPM Ground Validation program are: (1) error characterization of the precipitation retrievals and (2) continual improvement of the satellite retrieval algorithms. These two driving requirements determine the measurements, instrumentation, and location for ground observations. This paper describes GV plans for estimating the systematic and random components of retrieval error and for characterizing the spatial and temporal structure of the error. This paper describes the GPM program for algorithm improvement in which error models are developed and experimentally explored to uncover the physical causes of errors within the retrievals. GPM will ensure that information gained through Ground Validation is applied to future improvements in the spaceborne retrieval algorithms. This paper discusses the potential locations for validation measurement and research, the anticipated contributions of GPM's international partners, and the interaction of Ground Validation with other GPM program elements.

  1. The ISS as a platform for a fully simulated mars voyage

    NASA Astrophysics Data System (ADS)

    Narici, Livio; Reitz, Guenther

    2016-07-01

    The ISS can mimic the impact of microgravity, radiation, living and psychological conditions that astronauts will face during a deep space cruise, for example to Mars. This suggests the ISS as the most valuable "analogue" for deep space exploration. NASA has indeed suggested a 'full-up deep space simulation on last available ISS Mission: 6/7 crew for one year duration; full simulation of time delays & autonomous operations'. This idea should be pushed further. It is indeed conceivable to use the ISS as the final "analogue", performing a real 'dry-run' of a deep space mission (such as a mission to Mars), as close as reasonably possible to what will be the real voyage. This Mars ISS dry run (ISS4Mars) would last 500-800 days, mimicking most of the challenges which will be undertaken such as length, isolation, food provision, decision making, time delays, health monitoring diagnostic and therapeutic actions and more: not a collection of "single experiments", but a complete exploration simulation were all the pieces will come together for the first in space simulated Mars voyage. Most of these challenges are the same that those that will be encountered during a Moon voyage, with the most evident exceptions being the duration and the communication delay. At the time of the Mars ISS dry run all the science and technological challenges will have to be mostly solved by dedicated works. These solutions will be synergistically deployed in the dry run which will simulate all the different aspects of the voyage, the trip to Mars, the permanence on the planet and the return to Earth. During the dry run i) There will be no arrivals/departure of spacecrafts; 2) Proper communications delay with ground will be simulated; 3) Decision processes will migrate from Ground to ISS; 4) Permanence on Mars will be simulated. Mars ISS dry run will use just a portion of the ISS which will be totally isolated from the rest of the ISS, leaving to the other ISS portions the task to provide the needed operational support for the ISS survival as well as the support for emergency situations. Beside helping in focusing the attention of the many space and space related programs to the quest for Mars, ISS4Mars will maintain a high level of attention of the funding institutions and provide an important focus for the general public. This talk will present the many scientific issues still open to be addressed (see for example the disciplinary reports of the THESEUS project#), some example of the challenging tests that could be performed, some of the operational challenges, as well as list some of the issues not likely/possible to be simulated. # http://www.theseus-eu.org

  2. Ionospheric TEC Weather Map Over South America

    NASA Astrophysics Data System (ADS)

    Takahashi, H.; Wrasse, C. M.; Denardini, C. M.; Pádua, M. B.; de Paula, E. R.; Costa, S. M. A.; Otsuka, Y.; Shiokawa, K.; Monico, J. F. Galera; Ivo, A.; Sant'Anna, N.

    2016-11-01

    Ionospheric weather maps using the total electron content (TEC) monitored by ground-based Global Navigation Satellite Systems (GNSS) receivers over South American continent, TECMAP, have been operationally produced by Instituto Nacional de Pesquisas Espaciais's Space Weather Study and Monitoring Program (Estudo e Monitoramento Brasileiro de Clima Especial) since 2013. In order to cover the whole continent, four GNSS receiver networks, (Rede Brasileiro de Monitoramento Contínuo) RBMC/Brazilian Institute for Geography and Statistics, Low-latitude Ionospheric Sensor Network, International GNSS Service, and Red Argentina de Monitoreo Satelital Continuo, in total 140 sites, have been used. TECMAPs with a time resolution of 10 min are produced in 12 h time delay. Spatial resolution of the map is rather low, varying between 50 and 500 km depending on the density of the observation points. Large day-to-day variabilities of the equatorial ionization anomaly have been observed. Spatial gradient of TEC from the anomaly trough (total electron content unit, 1 TECU = 1016 el m-2 (TECU) <10) to the crest region (TECU > 80) causes a large ionospheric range delay in the GNSS positioning system. Ionospheric plasma bubbles, their seeding and development, could be monitored. This plasma density (spatial and temporal) variability causes not only the GNSS-based positioning error but also radio wave scintillations. Monitoring of these phenomena by TEC mapping becomes an important issue for space weather concern for high-technology positioning system and telecommunication.

  3. It's about time: Earlier rewards increase intrinsic motivation.

    PubMed

    Woolley, Kaitlin; Fishbach, Ayelet

    2018-06-01

    Can immediate (vs. delayed) rewards increase intrinsic motivation? Prior research compared the presence versus absence of rewards. By contrast, this research compared immediate versus delayed rewards, predicting that more immediate rewards increase intrinsic motivation by creating a perceptual fusion between the activity and its goal (i.e., the reward). In support of the hypothesis, framing a reward from watching a news program as more immediate (vs. delayed) increased intrinsic motivation to watch the program (Study 1), and receiving more immediate bonus (vs. delayed, Study 2; and vs. delayed and no bonus, Study 3) increased intrinsic motivation in an experimental task. The effect of reward timing was mediated by the strength of the association between an activity and a reward, and was specific to intrinsic (vs. extrinsic) motivation-immediacy influenced the positive experience of an activity, but not perceived outcome importance (Study 4). In addition, the effect of the timing of rewards was independent of the effect of the magnitude of the rewards (Study 5). (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  4. Preparation of X-ray astronomy satellite experiment Development of computer programs for the Salyut-HEXE X-ray experiment ground station

    NASA Astrophysics Data System (ADS)

    Petrik, J.

    The engineering model of the Salyut-HEXE experiment is described. The detector system, electronics box, and ground station are addressed. The microprocessor system is considered, discussing the cards and presenting block diagrams of their functions. The telemetry is examined, including the various modes and the direct and indirect transmission modes. The ground station programs are discussed, including the tasks, program development, input and output programs, status, power supply, count rates, telemetry dump, hard copy, and checksum.

  5. Department of Defense Joint Chemical and Biological Defense Program 2009 Annual Report to Congress

    DTIC Science & Technology

    2009-03-27

    completion at the ECBC on the Edgewood Area of Aberdeen Proving Ground (APG), MD. The SRF is a collaborative effort, funded by the DoD, DHS, and...Accelerated Manufacture of Pharmaceuticals APB Acquisition Program Baseline APG Aberdeen Proving Ground ARC Annual Report to Congress ASC Active...Critical Reagents Program CUGV Chemical, Biological, Radiological, and Nuclear Unmanned Ground Vehicle CW Chemical Weapons CWA Chemical Warfare Agent CWC

  6. Using GPS RO L1 data for calibration of the atmospheric path delay model for data reduction of the satellite altimetery observations.

    NASA Astrophysics Data System (ADS)

    Petrov, L.

    2017-12-01

    Processing satellite altimetry data requires the computation of path delayin the neutral atmosphere that is used for correcting ranges. The path delayis computed using numerical weather models and the accuracy of its computationdepends on the accuracy of numerical weather models. Accuracy of numerical modelsof numerical weather models over Antarctica and Greenland where there is a very sparse network of ground stations, is not well known. I used the dataset of GPS RO L1 data, computed predicted path delay for ROobservations using the numerical whether model GEOS-FPIT, formed the differences with observed path delay and used these differences for computationof the corrections to the a priori refractivity profile. These profiles wereused for computing corrections to the a priori zenith path delay. The systematic patter of these corrections are used for de-biasing of the the satellite altimetry results and for characterization of the systematic errorscaused by mismodeling atmosphere.

  7. Auroral Substorms during Prolonged Northward IMF

    NASA Astrophysics Data System (ADS)

    Du, Aimin

    Multiple observations by satellites and ground-based magnetometers identify the occurrence of substorm events during prolonged northward interplanetary magnetic field (IMF). The func-tion, as an expression of the solar wind energy flow, and the energy dissipation in the ionosphere (UI) are calculated during substorm periods. The delay time of the UI to the function and UI for seven substorm events with AL values of -231 -1500 nT under northward IMF condition are 45 95 min with a mean value of 70.86 min. For comparison, 23 substorm events with the AL index of -316 -1685 nT under southward IMF condition are detected to have the delay time of 21 66 min with a mean value of 42.04 min. The longer delay time for substorms during northward IMF can be presumably attributed to the contribution of IMF By component to merging between IMF and the Earth's magnetic field. A tendency of the decrease of the delay time with increasing absolute values of IMF By is noted. Acknowledgement: This work is supported by NSFC(40774086).

  8. 48 CFR 22.1014 - Delay over 60 days in bid opening or commencement of work.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Delay over 60 days in bid... ACQUISITION REGULATION SOCIOECONOMIC PROGRAMS APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS Service Contract Act of 1965, as Amended 22.1014 Delay over 60 days in bid opening or commencement of work. If a...

  9. Ionospheric Slant Total Electron Content Analysis Using Global Positioning System Based Estimation

    NASA Technical Reports Server (NTRS)

    Komjathy, Attila (Inventor); Mannucci, Anthony J. (Inventor); Sparks, Lawrence C. (Inventor)

    2017-01-01

    A method, system, apparatus, and computer program product provide the ability to analyze ionospheric slant total electron content (TEC) using global navigation satellite systems (GNSS)-based estimation. Slant TEC is estimated for a given set of raypath geometries by fitting historical GNSS data to a specified delay model. The accuracy of the specified delay model is estimated by computing delay estimate residuals and plotting a behavior of the delay estimate residuals. An ionospheric threat model is computed based on the specified delay model. Ionospheric grid delays (IGDs) and grid ionospheric vertical errors (GIVEs) are computed based on the ionospheric threat model.

  10. MSFC Skylab ground-based astronomy program

    NASA Technical Reports Server (NTRS)

    Duncan, B. J.

    1974-01-01

    The Skylab Ground-Based Astronomy Program (SGAP) was conducted to enhance the data base of solar physics obtained during the Apollo Telescope Mount (ATM) mission flown in conjunction with the Skylab orbital station. Leading solar physicists from various observatories obtained data from the ground at the same time that orbital data were being acquired by ATM. The acquisition of corollary solar data from the ground simultaneously with the ATM orbital observations helped to provide a broader basis for understanding solar physics by increasing spectral coverage and by the use of additional sophisticated instruments of various types. This report briefly describes the individual tasks and the associated instrumentation selected for this ground-based program and contains as appendices, the final reports from the Principal Investigators.

  11. Increasing the graduation rates of minority medical students.

    PubMed

    Payne, J L; Nowacki, C M; Girotti, J A; Townsel, J; Plagge, J C; Beckham, T W

    1986-05-01

    The University of Illinois College of Medicine has operated a program since 1969 to recruit minority students into the college and to increase the graduation rates of these students once they enroll. Known as the Medical Opportunities Program (MOP) until 1978, the program was expanded in 1978 and renamed the Urban Health Program (UHP). The authors of the present paper discuss the results of these programs, particularly the effect of granting minority students delays in completing graduation requirements. The MOP (1969 through 1978) increased graduation rates for minority students from 55 percent for those who graduated on time to 81 percent for both on-time and delayed graduates. Under the first seven years of the UHP (1979 through 1985), more minority students have been offered places, and more have enrolled than in the 10 years of the MOP. The retention rate under the UHP, if it holds, will be higher than that under the MOP. For the combined MOP-UHP period, the retention rate for minority students was 88 percent; 69.8 percent of the graduates were on time, and 30.2 were delayed.

  12. Benefit Estimates of Terminal Area Productivity Program Technologies

    NASA Technical Reports Server (NTRS)

    Hemm, Robert; Shapiro, Gerald; Lee, David; Gribko, Joana; Glaser, Bonnie

    1999-01-01

    This report documents benefit analyses for the NASA Terminal Area Technology (TAP) technology programs. Benefits are based on reductions in arrival delays at ten major airports over the 10 years from 2006 through 2015. Detailed analytic airport capacity and delay models were constructed to produce the estimates. The goal of TAP is enable good weather operations tempos in all weather conditions. The TAP program includes technologies to measure and predict runway occupancy times, reduce runway occupancy times in bad weather, accurately predict wake vortex hazards, and couple controller automation with aircraft flight management systems. The report presents and discusses the estimate results and describes the models. Three appendixes document the model algorithms and discuss the input parameters selected for the TAP technologies. The fourth appendix is the user's guide for the models. The results indicate that the combined benefits for all TAP technologies at all 10 airports range from $550 to $650 million per year (in constant 1997 dollars). Additional benefits will accrue from reductions in departure delays. Departure delay benefits are calculated by the current models.

  13. Timing and delay in children vaccination; evaluation of expanded program of immunization in outskirt of Iranian cities.

    PubMed

    Rejali, Mehri; Mohammadbeigi, Abolfazl; Mokhtari, Mohsen; Zahraei, Seyed Mohsen; Eshrati, Babak

    2015-01-01

    Most studies evaluated the vaccine coverage, but the time of vaccination is important as coverage. This study was conducted to evaluate the Expanded Program of Immunization (EPI) in outskirt of Iranian cities regarding to incidence of delay vaccination among children less than 4 years. This cross sectional descriptive study was conducted among children 24-47 months old, living in the suburbs of five metropolises of Iran. Totally, 3610 eligible children selected with proportioned cluster sampling method and data of vaccination card extracted after interview with child parents. Delayed incidence rate reported and predictive factors assessed by Chi square test and Multivariate logistic regression. Overall, 56.6% to 93.2% vaccines were administered out of time. Delayed vaccination incidence with more than one-week delay varies from 5.5% to 74.9% for polio at birth and MMR2 at 18 month, respectively. Mother's educational level and birth order were the most important predictors of delayed vaccination. Incidence of delayed vaccination was enlarged by increasing birth order and decreased in lower educated mothers. Incidence rate of delayed vaccination is more than expectation. Regarding to high coverage vaccines in Iran, heath officers and health policy makers should attempt for on-time vaccination beside of high immunization coverage especially in slum areas with more concentrated immigrants due to low literature and crowded families.

  14. Moral Waivers and Suitability for High Security Military Jobs

    DTIC Science & Technology

    1988-12-01

    Score 9 High School Diploma 10 Service Entry Variables 11 Months in the Delayed Entry Program (DEP) 11 DoD Primary Occupation Code ( DPOC ) 14...services 6 4. DoD Primary Occupational ( DPOC ) Areas 14 5. Cumulative percentage of personnel who received Bis during first six months of...Entry Variables - Months in the Delayed Entry Program (DEP) - DoD Primary Occupation Code ( DPOC ) Clearance Criteria - Issue case - Clearance status

  15. Agent Technology, Complex Adaptive Systems, and Autonomic Systems: Their Relationships

    NASA Technical Reports Server (NTRS)

    Truszkowski, Walt; Rash, James; Rouff, Chistopher; Hincheny, Mike

    2004-01-01

    To reduce the cost of future spaceflight missions and to perform new science, NASA has been investigating autonomous ground and space flight systems. These goals of cost reduction have been further complicated by nanosatellites for future science data-gathering which will have large communications delays and at times be out of contact with ground control for extended periods of time. This paper describes two prototype agent-based systems, the Lights-out Ground Operations System (LOGOS) and the Agent Concept Testbed (ACT), and their autonomic properties that were developed at NASA Goddard Space Flight Center (GSFC) to demonstrate autonomous operations of future space flight missions. The paper discusses the architecture of the two agent-based systems, operational scenarios of both, and the two systems autonomic properties.

  16. Disfluent Responses to Job Interview Questions and What They Entail

    ERIC Educational Resources Information Center

    Brosy, Julie; Bangerter, Adrian; Mayor, Eric

    2016-01-01

    Conversation is governed by expectations of timely responding. Violations of these expectations are grounds for inference by other participants. These inferences may be at odds with identities respondents try to project. In job interviews, candidates' responses are used to make hiring decisions. Candidates trade off between (1) delaying response…

  17. Autonomous Mission Operations

    NASA Technical Reports Server (NTRS)

    Frank, Jeremy; Spirkovska, Lilijana; McCann, Rob; Wang, Lui; Pohlkamp, Kara; Morin, Lee

    2012-01-01

    NASA's Advanced Exploration Systems Autonomous Mission Operations (AMO) project conducted an empirical investigation of the impact of time-delay on todays mission operations, and of the effect of processes and mission support tools designed to mitigate time-delay related impacts. Mission operation scenarios were designed for NASA's Deep Space Habitat (DSH), an analog spacecraft habitat, covering a range of activities including nominal objectives, DSH system failures, and crew medical emergencies. The scenarios were simulated at time-delay values representative of Lunar (1.2-5 sec), Near Earth Object (NEO) (50 sec) and Mars (300 sec) missions. Each combination of operational scenario and time-delay was tested in a Baseline configuration, designed to reflect present-day operations of the International Space Station, and a Mitigation configuration in which a variety of software tools, information displays, and crew-ground communications protocols were employed to assist both crews and Flight Control Team (FCT) members with the long-delay conditions. Preliminary findings indicate: 1) Workload of both crew members and FCT members generally increased along with increasing time delay. 2) Advanced procedure execution viewers, caution and warning tools, and communications protocols such as text messaging decreased the workload of both flight controllers and crew, and decreased the difficulty of coordinating activities. 3) Whereas crew workload ratings increased between 50 sec and 300 sec of time-delay in the Baseline configuration, workload ratings decreased (or remained flat) in the Mitigation configuration.

  18. STATE WATER RESOURCES RESEARCH INSTITUTE PROGRAM: GROUND WATER RESEARCH.

    USGS Publications Warehouse

    Burton, James S.; ,

    1985-01-01

    This paper updates a review of the accomplishments of the State Water Resources Research Program in ground water contamination research. The aim is to assess the progress made towards understanding the mechanisms of ground water contamination and based on this understanding, to suggest procedures for the prevention and control of ground water contamination. The following research areas are covered: (1) mechanisms of organic contaminant transport in the subsurface environment; (2) bacterial and viral contamination of ground water from landfills and septic tank systems; (3) fate and persistence of pesticides in the subsurface; (4) leachability and transport of ground water pollutants from coal production and utilization; and (5) pollution of ground water from mineral mining activities.

  19. COSMOGRAIL XVII: Time Delays for the Quadruply Imaged Quasar PG 1115+080

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bonvin, V.; et al.

    We present time-delay estimates for the quadruply imaged quasar PG 1115+080. Our resuls are based on almost daily observations for seven months at the ESO MPIA 2.2m telescope at La Silla Observatory, reaching a signal-to-noise ratio of about 1000 per quasar image. In addition, we re-analyse existing light curves from the literature that we complete with an additional three seasons of monitoring with the Mercator telescope at La Palma Observatory. When exploring the possible source of bias we consider the so-called microlensing time delay, a potential source of systematic error so far never directly accounted for in previous time-delay publications.more » In fifteen years of data on PG 1115+080, we find no strong evidence of microlensing time delay. Therefore not accounting for this effect, our time-delay estimates on the individual data sets are in good agreement with each other and with the literature. Combining the data sets, we obtain the most precise time-delay estimates to date on PG 1115+080, with Dt(AB) = 8.3+1.5-1.6 days (18.7% precision), Dt(AC) = 9.9+1.1-1.1 days (11.1%) and Dt(BC) = 18.8+1.6-1.6 days (8.5%). Turning these time delays into cosmological constraints is done in a companion paper that makes use of ground-based Adaptive Optics (AO) with the Keck telescope.« less

  20. A numerical simulation of the dispersal of aerial sprays

    NASA Technical Reports Server (NTRS)

    Bragg, M. B.

    1981-01-01

    A computer program was developed to predict the trajectory, ground deposition, and drift of liquid sprays injected into the wake of an agricultural aircraft in ground effect. The program uses a horseshoe vortex wake model and includes the effects of liquid droplet evaporation, crosswind, the propeller slipstream, ground effect, and tunnel walls on small scale models. This user's guide includes several case examples demonstrating user options. A complete listing of the FORTRAN program is provided.

  1. Impact of Advance Rate on Entrapment Risk of a Double-Shielded TBM in Squeezing Ground

    NASA Astrophysics Data System (ADS)

    Hasanpour, Rohola; Rostami, Jamal; Barla, Giovanni

    2015-05-01

    Shielded tunnel boring machines (TBMs) can get stuck in squeezing ground due to excessive tunnel convergence under high in situ stress. This typically coincides with extended machine stoppages, when the ground has sufficient time to undergo substantial displacements. Excessive convergence of the ground beyond the designated overboring means ground pressure against the shield and high shield frictional resistance that, in some cases, cannot be overcome by the TBM thrust system. This leads to machine entrapment in the ground, which causes significant delays and requires labor-intensive and risky operations of manual excavation to release the machine. To evaluate the impact of the time factor on the possibility of machine entrapment, a comprehensive 3D finite difference simulation of a double-shielded TBM in squeezing ground was performed. The modeling allowed for observation of the impact of the tunnel advance rate on the possibility of machine entrapment in squeezing ground. For this purpose, the model included rock mass properties related to creep in severe squeezing conditions. This paper offers an overview of the modeling results for a given set of rock mass and TBM parameters, as well as lining characteristics, including the magnitude of displacement and contact forces on shields and ground pressure on segmental lining versus time for different advance rates.

  2. The Advanced Orbiting Systems Testbed Program: Results to date

    NASA Technical Reports Server (NTRS)

    Otranto, John F.; Newsome, Penny A.

    1994-01-01

    The Consultative Committee for Space Data Systems (CCSDS) Recommendations for Packet Telemetry (PT) and Advanced Orbiting Systems (AOS) propose standard solutions to data handling problems common to many types of space missions. The Recommendations address only space/ground and space/space data handling systems. Goddard Space Flight Center's (GSFC's) AOS Testbed (AOST) Program was initiated to better understand the Recommendations and their impact on real-world systems, and to examine the extended domain of ground/ground data handling systems. The results and products of the Program will reduce the uncertainties associated with the development of operational space and ground systems that implement the Recommendations.

  3. Visual Basic programs for spreadsheet analysis.

    PubMed

    Hunt, Bruce

    2005-01-01

    A collection of Visual Basic programs, entitled Function.xls, has been written for ground water spreadsheet calculations. This collection includes programs for calculating mathematical functions and for evaluating analytical solutions in ground water hydraulics and contaminant transport. Several spreadsheet examples are given to illustrate their use.

  4. User Delay Cost Model and Facilities Maintenance Cost Model for a Terminal Control Area : Volume 2. User's Manual and Program Documentation for the User Delay Cost Model

    DOT National Transportation Integrated Search

    1978-05-01

    The User Delay Cost Model (UDCM) is a Monte Carlo simulation of certain classes of movement of air traffic in the Boston Terminal Control Area (TCA). It incorporates a weather module, an aircraft generation module, a facilities module, and an air con...

  5. Academic Delay of Gratification and Self-Efficacy Enhance Academic Achievement among Minority College Students.

    ERIC Educational Resources Information Center

    Bembenutty, Hefer

    The direct and indirect effects of academic delay of gratification and self-efficacy on academic performance of minority college students (n=45) were evaluated. The students were enrolled in an introductory writing course as part of a summer immersion program at a Midwestern university. The results of this study support the notion that delay of…

  6. Airport Surface Delays and Causes: A Preliminary Analysis

    NASA Technical Reports Server (NTRS)

    Chin, David K.; Goldberg, Jay; Tang, Tammy

    1997-01-01

    This report summarizes FAA Program Analysis and Operations Research Service (ASD-400)/Lockheed Martin activities and findings related to airport surface delays and causes, in support of NASA Langley Research Center's Terminal Area Productivity (TAP) Program. The activities described in this report were initiated in June 1995. A preliminary report was published on September 30, 1995. The final report incorporates data collection forms filled out by traffic managers, other FAA staff, and an airline for the New York City area, some updates, data previously requested from various sources to support this analysis, and further quantification and documentation than in the preliminary report. This final report is based on data available as of April 12, 1996. This report incorporates data obtained from review and analysis of data bases and literature, discussions/interviews with engineers, air-traffic staff, other FAA technical personnel, and airline staff, site visits, and a survey on surface delays and causes. It includes analysis of delay statistics; preliminary findings and conclusions on surface movement, surface delay sources and causes, runway occupancy time (ROT), and airport characteristics impacting surface operations and delays; and site-specific data on the New York City area airports, which are the focus airports for this report.

  7. MODFLOW Ground-Water Model - User Guide to the Subsidence and Aquifer-System Compaction Package (SUB-WT) for Water-Table Aquifers

    USGS Publications Warehouse

    Leake, S.A.; Galloway, D.L.

    2007-01-01

    A new computer program was developed to simulate vertical compaction in models of regional ground-water flow. The program simulates ground-water storage changes and compaction in discontinuous interbeds or in extensive confining units, accounting for stress-dependent changes in storage properties. The new program is a package for MODFLOW, the U.S. Geological Survey modular finite-difference ground-water flow model. Several features of the program make it useful for application in shallow, unconfined flow systems. Geostatic stress can be treated as a function of water-table elevation, and compaction is a function of computed changes in effective stress at the bottom of a model layer. Thickness of compressible sediments in an unconfined model layer can vary in proportion to saturated thickness.

  8. Academic delay of gratification, self-efficacy, and time management among academically unprepared college students.

    PubMed

    Bembenutty, Héfer

    2009-04-01

    This study examined the associations between academic delay of gratification, self-efficacy beliefs, and time management among academically unprepared college students participating in a summer-immersion program. This study also examined whether the relation of self-efficacy with time management is mediated by academic delay of gratification. Analysis indicated that self-efficacy was directly associated with time management, as delay of gratification served to mediate this effect partially. Self-efficacy emerged as the strongest positive predictor of academic achievement.

  9. U.S. Geological Survey Ground-Water Resources Program, 2001

    USGS Publications Warehouse

    Grannemann, Norman G.

    2001-01-01

    Ground water is among the Nation's most important natural resources. It provides drinking water to urban and rural communities, supports irrigation and industry, sustains the flow of streams and rivers, and maintains riparian and wetland ecosystems. In many areas of the Nation, the future sustainability of ground-water resources is at risk from over use and contamination. Because ground-water systems typically respond slowly to human actions and climate variability, a long-term perspective is needed to manage this valuable resource. The U.S. Geological Survey Ground-Water Resources Program provides regional evaluations, fundamental data, and predictive tools to help assure the sustainability of our Nation's ground-water resources.

  10. Use of RORA for Complex Ground-Water Flow Conditions

    USGS Publications Warehouse

    Rutledge, A.T.

    2004-01-01

    The RORA computer program for estimating recharge is based on a condition in which ground water flows perpendicular to the nearest stream that receives ground-water discharge. The method, therefore, does not explicitly account for the ground-water-flow component that is parallel to the stream. Hypothetical finite-difference simulations are used to demonstrate effects of complex flow conditions that consist of two components: one that is perpendicular to the stream and one that is parallel to the stream. Results of the simulations indicate that the RORA program can be used if certain constraints are applied in the estimation of the recession index, an input variable to the program. These constraints apply to a mathematical formulation based on aquifer properties, recession of ground-water levels, and recession of streamflow.

  11. Intra-EVA Space-to-Ground Interactions when Conducting Scientific Fieldwork Under Simulated Mars Mission Constraints

    NASA Technical Reports Server (NTRS)

    Beaton, Kara H.; Chappell, Steven P.; Abercromby, Andrew F. J.; Lim, Darlene S. S.

    2018-01-01

    The Biologic Analog Science Associated with Lava Terrains (BASALT) project is a four-year program dedicated to iteratively designing, implementing, and evaluating concepts of operations (ConOps) and supporting capabilities to enable and enhance scientific exploration for future human Mars missions. The BASALT project has incorporated three field deployments during which real (non-simulated) biological and geochemical field science have been conducted at two high-fidelity Mars analog locations under simulated Mars mission conditions, including communication delays and data transmission limitations. BASALT's primary Science objective has been to extract basaltic samples for the purpose of investigating how microbial communities and habitability correlate with the physical and geochemical characteristics of chemically altered basalt environments. Field sites include the active East Rift Zone on the Big Island of Hawai'i, reminiscent of early Mars when basaltic volcanism and interaction with water were widespread, and the dormant eastern Snake River Plain in Idaho, similar to present-day Mars where basaltic volcanism is rare and most evidence for volcano-driven hydrothermal activity is relict. BASALT's primary Science Operations objective has been to investigate exploration ConOps and capabilities that facilitate scientific return during human-robotic exploration under Mars mission constraints. Each field deployment has consisted of ten extravehicular activities (EVAs) on the volcanic flows in which crews of two extravehicular and two intravehicular crewmembers conducted the field science while communicating across time delay and under bandwidth constraints with an Earth-based Mission Support Center (MSC) comprised of expert scientists and operators. Communication latencies of 5 and 15 min one-way light time and low (0.512 Mb/s uplink, 1.54 Mb/s downlink) and high (5.0 Mb/s uplink, 10.0 Mb/s downlink) bandwidth conditions were evaluated. EVA crewmembers communicated with the MSC via voice and text messaging. They also provided scientific instrument data, still imagery, video streams from chest-mounted cameras, GPS location tracking information. The MSC monitored and reviewed incoming data from the field across delay and provided recommendations for pre-sampling and sampling tasks based on their collective expertise. The scientists used dynamic priority ranking lists, referred to as dynamic leaderboards, to track and rank candidate samples relative to one another and against the science objectives for the current EVA and the overall mission. Updates to the dynamic leaderboards throughout the EVA were relayed regularly to the IV crewmembers. The use of these leaderboards enabled the crew to track the dynamic nature of the MSC recommendations and helped minimize crew idle time (defined as time spent waiting for input from Earth during which no other productive tasks are being performed). EVA timelines were strategically designed to enable continuous (delayed) feedback from an Earth-based Science Team while simultaneously minimizing crew idle time. Such timelines are operationally advantageous, reducing transport costs by eliminating the need for crews to return to the same locations on multiple EVAs while still providing opportunities for recommendations from science experts on Earth, and scientifically advantageous by minimizing the potential for cross-contamination across sites. This paper will highlight the space-to-ground interaction results from the three BASALT field deployments, including planned versus actual EVA timeline data, ground assimilation times (defined as the amount of time available to the MSC to provide input to the crew), and idle time. Furthermore, we describe how these results vary under the different communication latency and bandwidth conditions. Together, these data will provide a basis for guiding and prioritizing capability development for future human exploration missions.

  12. Interaction of Airspace Partitions and Traffic Flow Management Delay

    NASA Technical Reports Server (NTRS)

    Palopo, Kee; Chatterji, Gano B.; Lee, Hak-Tae

    2010-01-01

    To ensure that air traffic demand does not exceed airport and airspace capacities, traffic management restrictions, such as delaying aircraft on the ground, assigning them different routes and metering them in the airspace, are implemented. To reduce the delays resulting from these restrictions, revising the partitioning of airspace has been proposed to distribute capacity to yield a more efficient airspace configuration. The capacity of an airspace partition, commonly referred to as a sector, is limited by the number of flights that an air traffic controller can safely manage within the sector. Where viable, re-partitioning of the airspace distributes the flights over more efficient sectors and reduces individual sector demand. This increases the overall airspace efficiency, but requires additional resources in some sectors in terms of controllers and equipment, which is undesirable. This study examines the tradeoff of the number of sectors designed for a specified amount of traffic in a clear-weather day and the delays needed for accommodating the traffic demand. Results show that most of the delays are caused by airport arrival and departure capacity constraints. Some delays caused by airspace capacity constraints can be eliminated by re-partitioning the airspace. Analyses show that about 360 high-altitude sectors, which are approximately today s operational number of sectors of 373, are adequate for delays to be driven solely by airport capacity constraints for the current daily air traffic demand. For a marginal increase of 15 seconds of average delay, the number of sectors can be reduced to 283. In addition, simulations of traffic growths of 15% and 20% with forecasted airport capacities in the years 2018 and 2025 show that delays will continue to be governed by airport capacities. In clear-weather days, for small increases in traffic demand, increasing sector capacities will have almost no effect on delays.

  13. Grounding after moderate eccentric contractions reduces muscle damage

    PubMed Central

    Brown, Richard; Chevalier, Gaétan; Hill, Michael

    2015-01-01

    Grounding a human to the earth has resulted in changes in the physiology of the body. A pilot study on grounding and eccentric contractions demonstrated shortened duration of pain, reduced creatine kinase (CK), and differences in blood parameters. This follow-up study was conducted to investigate the effects of grounding after moderate eccentric contractions on pain, CK, and complete blood counts. Thirty-two healthy young men were randomly divided into grounded (n=16) and sham-grounded (n=16) groups. On days 1 through 4, visual analog scale for pain evaluations and blood draws were accomplished. On day 1, the participants performed eccentric contractions of 200 half-knee bends. They were then grounded or sham-grounded to the earth for 4 hours on days 1 and 2. Both groups experienced pain on all posttest days. On day 2, the sham-grounded group experienced significant CK increase (P<0.01) while the CK of the grounded group did not increase significantly; the between-group difference was significant (P=0.04). There was also an increase in the neutrophils of the grounded group on day 3 (P=0.05) compared to the sham-grounded group. There was a significant increase in platelets in the grounded group on days 2 through 4. Grounding produced changes in CK and complete blood counts that were not shared by the sham-grounded group. Grounding significantly reduced the loss of CK from the injured muscles indicating reduced muscle damage. These results warrant further study on the effects of earthing on delayed onset muscle damage. PMID:26443876

  14. Report to the NASA Administrator by the Aerospace Safety Advisory Panel on the Space Shuttle Program. Part 1: Observations and Conclusions

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Each system was chosen on the basis of its importance with respect to crew safety and mission success. An overview of the systems management is presented. The space shuttle main engine, orbiter thermal protection system, avionics, external tanks and solid rocket boosters were examined. The ground test and ground support equipment programs were studied. Program management was found to have an adequate understanding of the significant ground and flight risks involved.

  15. Peer Educators in Critical Campus Discourse

    ERIC Educational Resources Information Center

    Voorhees, Rhondie; Petkas, Steven N.

    2011-01-01

    The Common Ground Multicultural Dialogue program in the Department of Resident Life at the University of Maryland is an innovative peer education program designed to teach skills for engagement through exploration of contemporary multicultural societal dilemmas. The Common Ground Dialogue Program was launched in 2000 to provide undergraduate…

  16. As-built design specification for segment map (Sgmap) program

    NASA Technical Reports Server (NTRS)

    Tompkins, M. A. (Principal Investigator)

    1981-01-01

    The segment map program (SGMAP), which is part of the CLASFYT package, is described in detail. This program is designed to output symbolic maps or numerical dumps from LANDSAT cluster/classification files or aircraft ground truth/processed ground truth files which are in 'universal' format.

  17. Smart-Grid Backbone Network Real-Time Delay Reduction via Integer Programming.

    PubMed

    Pagadrai, Sasikanth; Yilmaz, Muhittin; Valluri, Pratyush

    2016-08-01

    This research investigates an optimal delay-based virtual topology design using integer linear programming (ILP), which is applied to the current backbone networks such as smart-grid real-time communication systems. A network traffic matrix is applied and the corresponding virtual topology problem is solved using the ILP formulations that include a network delay-dependent objective function and lightpath routing, wavelength assignment, wavelength continuity, flow routing, and traffic loss constraints. The proposed optimization approach provides an efficient deterministic integration of intelligent sensing and decision making, and network learning features for superior smart grid operations by adaptively responding the time-varying network traffic data as well as operational constraints to maintain optimal virtual topologies. A representative optical backbone network has been utilized to demonstrate the proposed optimization framework whose simulation results indicate that superior smart-grid network performance can be achieved using commercial networks and integer programming.

  18. Determinants of choice, and vulnerability and recovery in addiction.

    PubMed

    Lamb, R J; Maguire, David R; Ginsburg, Brett C; Pinkston, Jonathan W; France, Charles P

    2016-06-01

    Addiction may be viewed as choice governed by competing contingencies. One factor impacting choice, particularly as it relates to addiction, is sensitivity to delayed rewards. Discounting of delayed rewards influences addiction vulnerability because of competition between relatively immediate gains of drug use, e.g. intoxication, versus relatively remote gains of abstinence, e.g. family stability. Factors modifying delay sensitivity can be modeled in the laboratory. For instance, increased delay sensitivity can be similarly observed in adolescent humans and non-human animals. Similarly, genetic factors influence delay sensitivity in humans and animals. Recovery from addiction may also be viewed as choice behavior. Thus, reinforcing alternative behavior facilitates recovery because reinforcing alternative behavior decreases the frequency of using drugs. How reinforcing alternative behavior influences recovery can also be modeled in the laboratory. For instance, relapse risk decreases as abstinence duration increases, and this decreasing risk can be modeled in animals using choice procedures. In summary, addiction in many respects can be conceptualized as a problem of choice. Animal models of choice disorders stand to increase our understanding of the core processes that establish and maintain addiction and serve as a proving ground for development of novel treatments. Copyright © 2016 Elsevier B.V. All rights reserved.

  19. Determinants of choice, and vulnerability and recovery in addiction

    PubMed Central

    Lamb, R.J.; Maguire, David R.; Ginsburg, Brett C.; Pinkston, Jonathan W.; France, Charles P.

    2016-01-01

    Addiction may be viewed as choice governed by competing contingencies. One factor impacting choice, particularly as it relates to addiction, is sensitivity to delayed rewards. Discounting of delayed rewards influences addiction vulnerability because of competition between relatively immediate gains of drug use, e.g. intoxication, versus relatively remote gains of abstinence, e.g. family stability. Factors modifying delay sensitivity can be modeled in the laboratory. For instance, increased delay sensitivity can be similarly observed in adolescent humans and non-human animals. Similarly, genetic factors influence delay sensitivity in humans and animals. Recovery from addiction may also be viewed as choice behavior. Thus, reinforcing alternative behavior facilitates recovery because reinforcing alternative behavior decreases the frequency of using drugs. How reinforcing alternative behavior influences recovery can also be modeled in the laboratory. For instance, relapse risk decreases as abstinence duration increases, and this decreasing risk can be modeled in animals using choice procedures. In summary, addiction in many respects can be conceptualized as a problem of choice. Animal models of choice disorders stand to increase our understanding of the core processes that establish and maintain addiction and serve as a proving ground for development of novel treatments. PMID:27083500

  20. Human Flight to Lunar and Beyond - Re-Learning Operations Paradigms

    NASA Technical Reports Server (NTRS)

    Kenny, Edward (Ted); Statman, Joseph

    2016-01-01

    For the first time since the Apollo era, NASA is planning on sending astronauts on flights beyond LEO. The Human Space Flight (HSF) program started with a successful initial flight in Earth orbit, in December 2014. The program will continue with two Exploration Missions (EM): EM-1 will be unmanned and EM-2, carrying astronauts, will follow. NASA established a multi-center team to address the communications, and related tacking/navigation needs. This paper will focus on the lessons learned by the team designing the architecture and operations for the missions. Many of these Beyond Earth Orbit lessons had to be re-learned, as the HSF program has operated for many years in Earth orbit. Unlike the Apollo missions that were largely tracked by a dedicated ground network, the HSF planned missions will be tracked (at distances beyond GEO) by the DSN, a network that mostly serves robotic missions. There have been surprising challenges to the DSN as unique modern human spaceflight needs stretch the experience base beyond that of tracking robotic missions in deep space. Close interaction between the DSN and the HSF community to understand the unique needs (e.g. 2-way voice) resulted in a Concept of Operations (ConOps) that leverages both the deep space robotic and the Human LEO experiences. Several examples will be used to highlight the unique challenges the team faced in establishing the communications and tracking capabilities for HSF missions beyond Earth Orbit, including: Navigation. At LEO, HSF missions can rely on GPS devices for orbit determination. For Lunar-and-beyond HSF missions, techniques such as precision 2-way and 3-way Doppler and ranging, Delta-Difference-of-range, and eventually possibly on-board navigation will be used. At the same time, HSF presents a challenge to navigators, beyond those presented by robotic missions - navigating a dynamic/"noisy" spacecraft. Impact of latency - the delay associated with Round-Trip-Light-Time (RTLT). Imagine trying to have a 2-way discussion (audio or video) with an astronaut, with a 2-3 sec or more delay inserted (for lunar distances) or 20 minutes delay (for Mars distances). Balanced communications link. For robotic missions, there has been a heavy emphasis on higher downlink data rates, e.g. bringing back science data. Higher uplink data rates were of secondary importance, as uplink was used only to send commands (and occasionally small files) to the spacecraft. The ratio of downlink-to-uplink data rates was often 10:1 or more. For HSF, a continuous forward link is established and rates for uplink and downlink are more similar.

  1. Smoking-related outcomes and associations with tobacco-free policy in addiction treatment, 2015-2016.

    PubMed

    Guydish, Joseph; Yip, Deborah; Le, Thao; Gubner, Noah R; Delucchi, Kevin; Roman, Paul

    2017-10-01

    This study assessed changes in smoking-related outcomes in two cross-sectional samples of clients enrolled in addiction treatment and whether tobacco-free grounds policies were associated with smoking-related outcomes. Clients in 25 programs were surveyed in 2015 (N=1176) and 2016 (N=1055). The samples were compared on smoking prevalence, cigarettes per day (CPD), thinking of quitting, past year quit attempts, staff and clients smoking together, attitudes towards quitting, and tobacco-related services. Second, programs with (n=6) and without (n=17) tobacco-free grounds at both time points were compared on smoking-related outcomes. Last, we examined changes in these measures for two programs that adopted tobacco-free grounds between 2015 and 2016. There was one difference across years, such that the mean score for the tobacco Program Service scale increased from 2.37 to 2.48 (p=0.043, effect size=0.02). In programs with tobacco-free grounds policies, compared to those without, both CPD and the rate of staff and clients smoking together were significantly lower. In the two programs where tobacco-free grounds were implemented during study years, client smoking prevalence decreased (92.5% v. 67.6%, p=0.005), the rate of staff and clients smoking together decreased (35.6% v. 4.2%, p=0.031), mean CPD decreased (10.62v. 8.24, p<0.001) and mean tobacco services received by clients increased (2.08v. 3.05, p<0.001). Addiction treatment programs, and agencies responsible for licensing, regulating and funding these programs, should implement tobacco-free grounds policies. Copyright © 2017 Elsevier B.V. All rights reserved.

  2. Modeling the global positioning system signal propagation through the ionosphere

    NASA Technical Reports Server (NTRS)

    Bassiri, S.; Hajj, G. A.

    1992-01-01

    Based on realistic modeling of the electron density of the ionosphere and using a dipole moment approximation for the Earth's magnetic field, one is able to estimate the effect of the ionosphere on the Global Positioning System (GPS) signal for a ground user. The lowest order effect, which is on the order of 0.1-100 m of group delay, is subtracted out by forming a linear combination of the dual frequencies of the GPS signal. One is left with second- and third-order effects that are estimated typically to be approximately 0-2 cm and approximately 0-2 mm at zenith, respectively, depending on the geographical location, the time of day, the time of year, the solar cycle, and the relative geometry of the magnetic field and the line of sight. Given the total electron content along a line of sight, the authors derive an approximation to the second-order term which is accurate to approximately 90 percent within the magnetic dipole moment model; this approximation can be used to reduce the second-order term to the millimeter level, thus potentially improving precise positioning in space and on the ground. The induced group delay, or phase advance, due to second- and third-order effects is examined for two ground receivers located at equatorial and mid-latitude regions tracking several GPS satellites.

  3. ELF/VLF wave propagation at subauroral latitudes: Conjugate observation between the ground and Van Allen Probes A

    NASA Astrophysics Data System (ADS)

    Martinez-Calderon, Claudia; Shiokawa, Kazuo; Miyoshi, Yoshizumi; Keika, Kunihiro; Ozaki, Mitsunori; Schofield, Ian; Connors, Martin; Kletzing, Craig; Hanzelka, Miroslav; Santolik, Ondrej; Kurth, William S.

    2016-06-01

    We report simultaneous observation of ELF/VLF emissions, showing similar spectral and frequency features, between a VLF receiver at Athabasca (ATH), Canada, (L = 4.3) and Van Allen Probes A (Radiation Belt Storm Probes (RBSP) A). Using a statistical database from 1 November 2012 to 31 October 2013, we compared a total of 347 emissions observed on the ground with observations made by RBSP in the magnetosphere. On 25 February 2013, from 12:46 to 13:39 UT in the dawn sector (04-06 magnetic local time (MLT)), we observed a quasiperiodic (QP) emission centered at 4 kHz, and an accompanying short pulse lasting less than a second at 4.8 kHz in the dawn sector (04-06 MLT). RBSP A wave data showed both emissions as right-hand polarized with their Poynting vector earthward to the Northern Hemisphere. Using cross-correlation analysis, we did, for the first time, time delay analysis of a conjugate ELF/VLF event between ground and space, finding +2 to +4 s (ATH first) for the QP and -3 s (RBSP A first) for the pulse. Using backward tracing from ATH to the geomagnetic equator and forward tracing from the equator to RBSP A, based on plasmaspheric density observed by the spacecraft, we validate a possible propagation path for the QP emission which is consistent with the observed time delay.

  4. 18 CFR 430.13 - Protected area permits for new withdrawals.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... approved by the Commission. (3) A program to monitor and control ground water infiltration to the receiving sewer system. The program must quantify ground water infiltration to the system and document reductions in infiltration. The program should include such measures as leakage surveys of sewer mains, metering...

  5. 18 CFR 430.13 - Protected area permits for new withdrawals.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... approved by the Commission. (3) A program to monitor and control ground water infiltration to the receiving sewer system. The program must quantify ground water infiltration to the system and document reductions in infiltration. The program should include such measures as leakage surveys of sewer mains, metering...

  6. 18 CFR 430.13 - Protected area permits for new withdrawals.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... approved by the Commission. (3) A program to monitor and control ground water infiltration to the receiving sewer system. The program must quantify ground water infiltration to the system and document reductions in infiltration. The program should include such measures as leakage surveys of sewer mains, metering...

  7. 18 CFR 430.13 - Protected area permits for new withdrawals.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... approved by the Commission. (3) A program to monitor and control ground water infiltration to the receiving sewer system. The program must quantify ground water infiltration to the system and document reductions in infiltration. The program should include such measures as leakage surveys of sewer mains, metering...

  8. 40 CFR 258.58 - Implementation of the corrective action program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective...) Establish and implement a corrective action ground-water monitoring program that: (i) At a minimum, meet the requirements of an assessment monitoring program under § 258.55; (ii) Indicate the effectiveness of the...

  9. 40 CFR 257.28 - Implementation of the corrective action program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-Municipal Non-Hazardous Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.28... corrective action ground-water monitoring program that: (i) At a minimum, meets the requirements of an assessment monitoring program under § 257.25; (ii) Indicates the effectiveness of the corrective action...

  10. 40 CFR 257.28 - Implementation of the corrective action program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-Municipal Non-Hazardous Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.28... corrective action ground-water monitoring program that: (i) At a minimum, meets the requirements of an assessment monitoring program under § 257.25; (ii) Indicates the effectiveness of the corrective action...

  11. 40 CFR 258.58 - Implementation of the corrective action program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258... implement a corrective action ground-water monitoring program that: (i) At a minimum, meet the requirements of an assessment monitoring program under § 258.55; (ii) Indicate the effectiveness of the corrective...

  12. 40 CFR 258.58 - Implementation of the corrective action program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective...) Establish and implement a corrective action ground-water monitoring program that: (i) At a minimum, meet the requirements of an assessment monitoring program under § 258.55; (ii) Indicate the effectiveness of the...

  13. 40 CFR 258.58 - Implementation of the corrective action program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective...) Establish and implement a corrective action ground-water monitoring program that: (i) At a minimum, meet the requirements of an assessment monitoring program under § 258.55; (ii) Indicate the effectiveness of the...

  14. 40 CFR 257.28 - Implementation of the corrective action program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-Municipal Non-Hazardous Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.28... corrective action ground-water monitoring program that: (i) At a minimum, meets the requirements of an assessment monitoring program under § 257.25; (ii) Indicates the effectiveness of the corrective action...

  15. 40 CFR 257.28 - Implementation of the corrective action program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-Hazardous Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.28 Implementation of the... ground-water monitoring program that: (i) At a minimum, meets the requirements of an assessment monitoring program under § 257.25; (ii) Indicates the effectiveness of the corrective action remedy; and (iii...

  16. Flying-qualities criteria for wings-level-turn maneuvering during an air-to-ground weapon delivery task

    NASA Technical Reports Server (NTRS)

    Sammonds, R. I.; Bunnell, J. W., Jr.

    1980-01-01

    A moving-base simulator experiment conducted at Ames Research Center demonstrated that a wings-level-turn control mode improved flying qualities for air-to-ground weapons delivery compared with those of a conventional aircraft. Evaluations of criteria for dynamic response for this system have shown that pilot ratings correlate well on the basis of equivalent time constant of the initial response. Ranges of this time constant, as well as digital-system transport delays and lateral-acceleration control authorities that encompassed Level I through Level III handling qualities, were determined.

  17. Test Results for the 2.5-kVA Ground Fault Detector.

    DTIC Science & Technology

    1986-01-01

    powered through Q1 is delayed in turning off by capacitor C4 for approximately 12 msec. When the relay does drop out, the triac Q7 (a bidirectional...SECONDS) CALBIRATIONS, ETC.) / / -. L a 2 33 ( j4 -40 7 S’f9 I! Note time of con pletlon o test series . .I1 " , -3 TEST DATA FORM Bc (CONTINUATION...test series . 2 *51/7 ,6. L7.. i K-t TEST CATA FORM D OCEAN OPERABILITY TESTS FOR ELEETRIC FIELD DETECTOR AND GROUND FAULT DETECTORS This data form is to

  18. Managing the Mars Science Laboratory Thermal Vacuum Test for Safety and Success

    NASA Technical Reports Server (NTRS)

    Evans, Jordan P.

    2010-01-01

    The Mars Science Laboratory is a NASA/JPL mission to send the next generation of rover to Mars. Originally slated for launch in 2009, development problems led to a delay in the project until the next launch opportunity in 2011. Amidst the delay process, the Launch/Cruise Solar Thermal Vacuum Test was undertaken as risk reduction for the project. With varying maturity and capabilities of the flight and ground systems, undertaking the test in a safe manner presented many challenges. This paper describes the technical and management challenges and the actions undertaken that led to the ultimate safe and successful execution of the test.

  19. Tolerable hearing-aid delays: IV. effects on subjective disturbance during speech production by hearing-impaired subjects.

    PubMed

    Stone, Michael A; Moore, Brian C J

    2005-04-01

    We assessed the effects of time delay in a hearing aid on subjective disturbance and reading rates while the user of the aid was speaking, using hearing-impaired subjects and real-time processing. The time delay was constant across frequency. A digital signal processor was programmed as a four-channel, fast-acting, wide-dynamic-range compression hearing aid. One of four delays could be selected on the aid to produce a total delay of 13, 21, 30, or 40 msec between microphone and receiver. Twenty-five subjects, mostly with near-symmetric hearing impairment of cochlear origin, were fitted bilaterally with behind-the-ear aids connected to the processor. The aids were programmed with insertion gains prescribed by the CAMEQ loudness equalization procedure for each subject and ear. Subjects were asked to read aloud from scripts: speech production rates were measured and subjective ratings of the disturbance of the delay were obtained. Subjects required some training to recognize the effects of the delay to rate it consistently. Subjective disturbance increased progressively with increasing delay and was a nonmonotonic function of low-frequency hearing loss. Subjects with mild or severe low-frequency hearing loss were generally less disturbed by the delay than those with moderate loss. Disturbance ratings tended to decrease over successive tests. Word production rates were not significantly affected by delay over the range of delays tested. The results follow a pattern similar to those presented in , obtained using a simulation of hearing loss and normally hearing subjects, except for the nonmonotonic variation of disturbance with low-frequency hearing loss. We hypothesize that disturbance is maximal when the levels in the ear canal of the low-frequency components are similar for the unaided and aided sounds. A rating of 3, which is probably just acceptable, was obtained for delays ranging from 14 to 30 msec, depending on the hearing loss. Some acclimatization to the subjective disturbance occurred over a time scale of about 1 hour.

  20. Soft Computing Approach to Evaluate and Predict Blast-Induced Ground Vibration

    NASA Astrophysics Data System (ADS)

    Khandelwal, Manoj

    2010-05-01

    Drilling and blasting is still one of the major economical operations to excavate a rock mass. The consumption of explosive has been increased many folds in recent years. These explosives are mainly used for the exploitation of minerals in mining industry or the removal of undesirable rockmass for community development. The amount of chemical energy converted into mechanical energy to fragment and displace the rockmass is minimal. Only 20 to 30% of this explosive energy is utilized for the actual fragmentation and displacement of rockmass and rest of the energy is wasted in undesirable ill effects, like, ground vibration, air over pressure, fly rock, back break, noise, etc. Ground vibration induced due to blasting is very crucial and critical as compared to other ill effects due to involvement of public residing in the close vicinity of mining sites, regulating and ground vibration standards setting agencies together with mine owners and environmentalists and ecologists. Also, with the emphasis shifting towards eco-friendly, sustainable and geo-environmental activities, the field of ground vibration have now become an important and imperative parameter for safe and smooth running of any mining and civil project. The ground vibration is a wave motion, spreading outward from the blast like ripples spreading outwards due to impact of a stone dropped into a pond of water. As the vibration passes through the surface structures, it induces vibrations in those structures also. Sometimes, due to high ground vibration level, dwellings may get damaged and there is always confrontation between mine management and the people residing in the surroundings of the mine area. There is number of vibration predictors available suggested by different researchers. All the predictors estimate the PPV based on mainly two parameters (maximum charge used per delay and distance between blast face to monitoring point). However, few predictors considered attenuation/damping factor too. For the same excavation site, different predictors give different values of safe PPV vis-à-vis safe charge per delay. There is no uniformity in the predicted result by different predictors. All vibration predictor equations have their site specific constants. Therefore, they cannot be used in a generalized way with confidence and zero level of risk. To overcome on this aspect new soft computing tools like artificial neural network (ANN) has attracted because of its ability to learn from the pattern acquainted before. ANN has the ability to learn from patterns acquainted before. It is a highly interconnected network of a large number of processing elements called neurons in an architecture inspired by the brain. ANN can be massively parallel and hence said to exhibit parallel distributed processing. Once, the network has been trained, with sufficient number of sample data sets, it can make reliable and trustworthy predictions on the basis of its previous learning, about the output related to new input data set of similar pattern. This paper deals the application of ANN for the prediction of ground vibration by taking into consideration of maximum charge per delay and distance between blast face to monitoring point. To investigate the appropriateness of this approach, the predictions by ANN have been also compared with other vibration predictor equations.

  1. Dissolvable fluidic time delays for programming multi-step assays in instrument-free paper diagnostics.

    PubMed

    Lutz, Barry; Liang, Tinny; Fu, Elain; Ramachandran, Sujatha; Kauffman, Peter; Yager, Paul

    2013-07-21

    Lateral flow tests (LFTs) are an ingenious format for rapid and easy-to-use diagnostics, but they are fundamentally limited to assay chemistries that can be reduced to a single chemical step. In contrast, most laboratory diagnostic assays rely on multiple timed steps carried out by a human or a machine. Here, we use dissolvable sugar applied to paper to create programmable flow delays and present a paper network topology that uses these time delays to program automated multi-step fluidic protocols. Solutions of sucrose at different concentrations (10-70% of saturation) were added to paper strips and dried to create fluidic time delays spanning minutes to nearly an hour. A simple folding card format employing sugar delays was shown to automate a four-step fluidic process initiated by a single user activation step (folding the card); this device was used to perform a signal-amplified sandwich immunoassay for a diagnostic biomarker for malaria. The cards are capable of automating multi-step assay protocols normally used in laboratories, but in a rapid, low-cost, and easy-to-use format.

  2. Dissolvable fluidic time delays for programming multi-step assays in instrument-free paper diagnostics

    PubMed Central

    Lutz, Barry; Liang, Tinny; Fu, Elain; Ramachandran, Sujatha; Kauffman, Peter; Yager, Paul

    2013-01-01

    Lateral flow tests (LFTs) are an ingenious format for rapid and easy-to-use diagnostics, but they are fundamentally limited to assay chemistries that can be reduced to a single chemical step. In contrast, most laboratory diagnostic assays rely on multiple timed steps carried out by a human or a machine. Here, we use dissolvable sugar applied to paper to create programmable flow delays and present a paper network topology that uses these time delays to program automated multi-step fluidic protocols. Solutions of sucrose at different concentrations (10-70% of saturation) were added to paper strips and dried to create fluidic time delays spanning minutes to nearly an hour. A simple folding card format employing sugar delays was shown to automate a four-step fluidic process initiated by a single user activation step (folding the card); this device was used to perform a signal-amplified sandwich immunoassay for a diagnostic biomarker for malaria. The cards are capable of automating multi-step assay protocols normally used in laboratories, but in a rapid, low-cost, and easy-to-use format. PMID:23685876

  3. Ground-water recharge in humid areas of the United States: A summary of Ground-Water Resources Program studies, 2003-2006

    USGS Publications Warehouse

    Delin, Geoffrey N.; Risser, Dennis W.

    2007-01-01

    Increased demands on water resources by a growing population and recent droughts have raised awareness about the adequacy of ground-water resources in humid areas of the United States. The spatial and temporal variability of ground-water recharge are key factors that need to be quantified to determine the sustainability of ground-water resources. Ground-water recharge is defined herein as the entry into the saturated zone of water made available at the water-table surface, together with the associated flow away from the water table within the saturated zone (Freeze and Cherry, 1979). In response to the need for better estimates of ground-water recharge, the Ground-Water Resources Program (GWRP) of the U.S. Geological Survey (USGS) began an initiative in 2003 to estimate ground-water recharge rates in the relatively humid areas of the United States.

  4. Investigation of impingement region and wall jets formed by the interaction of high aspect ratio lift jets and a ground plane

    NASA Technical Reports Server (NTRS)

    Kotansky, D. R.; Glaze, L. W.

    1978-01-01

    Flow characteristics of impinging jets emanating from rectangular exit area converging nozzles of exit area aspect ratio four, six, and eight were investigated. Azimuthal distributions of wall jet radial momentum flux in the ground plane were strongly directional and sensitive to rectangular nozzle exit area aspect ratio, jet impingement angle, and height above ground, H/D. Effects of jet exit velocity profile nonuniformities were also investigated. Data from the single nozzle rectangular jet impringement investigations were incorporated into an existing VTOL aircraft ground flow field computer program. It is suggested that this program together with the Douglas Neumann program modified for V/STOL applications may be used for the analysis and prediction of flow fields and resulting forces and moments on multijet V/STOL aircraft hovering in ground effect.

  5. Developing and Evaluating Computer-Based Teamwork Skills Training for Long-Duration Spaceflight Crews

    ERIC Educational Resources Information Center

    Hixson, Katharine

    2013-01-01

    Due to the long-duration and long distance nature of future exploration missions, coupled with significant communication delays from ground-based personnel, NASA astronauts will be living and working within confined, isolated environments for significant periods of time. This extreme environment poses concerns for the flight crews' ability to…

  6. STD Installation and Maintenance Procedures. Satellite Technology DEmonstration, Technical Report No. 0421.

    ERIC Educational Resources Information Center

    Lane, Billy D.

    The ground terminals for the Satellite Technology Demonstration were more expensive to install than was anticipated because crews forced to make numerous visits to each site. Delays were caused by delinquent deliveries and by malfunctions in some of the subsystems. Insufficient time was allowed for trouble shooting, and consequently, additional…

  7. Smarter Software For Enhanced Vehicle Health Monitoring and Inter-Planetary Exploration

    NASA Technical Reports Server (NTRS)

    Larson, William E.; Goodrich, Charles H.; Steinrock, Todd (Technical Monitor)

    2001-01-01

    The existing philosophy for space mission control was born in the early days of the space program when technology did not exist to put significant control responsibility onboard the spacecraft. NASA relied on a team of ground control experts to troubleshoot systems when problems occurred. As computing capability improved, more responsibility was handed over to the systems software. However, there is still a large contingent of both launch and flight controllers supporting each mission. New technology can update this philosophy to increase mission assurance and reduce the cost of inter-planetary exploration. The advent of model-based diagnosis and intelligent planning software enables spacecraft to handle most routine problems automatically and allocate resources in a flexible way to realize mission objectives. The manifests for recent missions include multiple subsystems and complex experiments. Spacecraft must operate at longer distances from earth where communications delays make earthbound command and control impractical. NASA's Ames Research Center (ARC) has demonstrated the utility of onboard diagnosis and planning with the Remote Agent experiment in 1999. KSC has pioneered model-based diagnosis and demonstrated its utility for ground support operations. KSC and ARC are cooperating in research to improve the state of the art of this technology. This paper highlights model-based reasoning applications for Moon and Mars missions including in-situ resource utilization and enhanced vehicle health monitoring.

  8. The cloud–ionosphere discharge: A newly observed thunderstorm phenomenon

    PubMed Central

    Winckler, John R.

    1997-01-01

    This paper deals with a luminous electric discharge that forms in the mesospheric region between thundercloud tops and the ionosphere at 90-km altitude. These cloud–ionosphere discharges (CIs), following visual reports dating back to the 19th century, were finally imaged by a low-light TV camera as part of the “SKYFLASH” program at the University of Minnesota in 1989. Many observations were made by various groups in the period 1993–1996. The characteristics of CIs are that they have a wide range of sizes from a few kilometers up to 50 km horizontally; they extend from 40 km to nearly 90 km vertically, with an intense region near 60–70 km and streamers extending down toward cloud tops; the CIs are partly or entirely composed of vertical luminous filaments of kilometer size. The predominate color is red. The TV images show that the CIs usually have a duration less than one TV field (16.7 ms), but higher-speed photometric measurements show that they last about 3 ms, and are delayed 3 ms after an initiating cloud–ground lightning stroke; 95% of these initiating strokes are found to be “positive”—i.e., carry positive charges from clouds to ground. The preference for positive initiating strokes is not understood. Theories of the formation of CIs are briefly reviewed. PMID:11038577

  9. [Determinants of tuberculosis diagnosis delay in limited resources countries].

    PubMed

    Ndeikoundam Ngangro, N; Chauvin, P; Halley des Fontaines, V

    2012-02-01

    Delayed diagnoses of pulmonary tuberculosis contribute to the spread of the epidemic. This study aims to identify risk factors associated with patient delay (from symptoms onset to the first visit), health system delay (from the first visit to the tuberculosis treatment initiation) and total delay (sum of the patient and the health system delay) in low income and high tuberculosis burden countries. A systematic literature review has been performed using the keywords: "tuberculosis"; "delay", care seeking"; "health care seeking behavior"; "diagnosis" and "treatment". Only quantitative studies showing delays for pulmonary tuberculosis adult cases were included in this review. Low income, gender, rural life, unemployment, ageing and misunderstanding the microbial cause of tuberculosis are associated with delayed diagnoses. Systemic factors including low health care coverage, patient expenditures and entry into the health system by consulting a traditional healer or a non-skilled professional delay the beginning of tuberculosis treatment. Delays can be used as indicators to evaluate tuberculosis control programs. Active case finding in the households of contagious patients can help to diminish diagnostic delays in low-income countries with high endemicity. Copyright © 2011 Elsevier Masson SAS. All rights reserved.

  10. Assessing “First Mile” Supply Chain Factors Affecting Timeliness of School-Based Deworming Interventions: Supply and Logistics Performance Indicators

    PubMed Central

    Koporc, Kimberly M.; Strunz, Eric; Holloway, Cassandra; Addiss, David G.; Lin, William

    2015-01-01

    Background Between 2007 and 2012, Children Without Worms (CWW) oversaw the Johnson & Johnson (J&J) donation of Vermox (mebendazole) for treatment of school-age children to control soil-transmitted helminthiasis (STH). To identify factors associated with on-time, delayed, or missed mass drug administration (MDA) interventions, and explore possible indicators for supply chain performance for drug donation programs, we reviewed program data for the 14 STH-endemic countries CWW supported during 2007–2012. Methodology Data from drug applications, shipping records, and annual treatment reports were tracked using Microsoft Excel. Qualitative data from interviews with key personnel were used to provide additional context on the causes of delayed or missed MDAs. Four possible contributory factors to delayed or missed MDAs were considered: production, shipping, customs clearance, and miscellaneous in-country issues. Coverage rates were calculated by dividing the number of treatments administered by the number of children targeted during the MDA. Principal Findings Of the approved requests for 78 MDAs, 54 MDAs (69%) were successfully implemented during or before the scheduled month. Ten MDAs (13%) were classified as delayed; seven of these were delayed by one month or less. An additional 14 MDAs (18%) were classified as missed. For the 64 on-time or delayed MDAs, the mean coverage was approximately 88%. Conclusions and Significance To continue to assess the supply chain processes and identify areas for improvement, we identified four indicators or metrics for supply chain performance that can be applied across all neglected tropical disease (NTD) drug donation programs: (1) donor having available inventory to satisfy the country request for donation; (2) donor shipping the approved number of doses; (3) shipment arriving at the Central Medical Stores one month in advance of the scheduled MDA date; and (4) country programs implementing the MDA as scheduled. PMID:26657842

  11. Global Temperature and Salinity Pilot Project

    NASA Technical Reports Server (NTRS)

    Searle, Ben

    1992-01-01

    Data exchange and data management programs have been evolving over many years. Within the international community there are two main programs to support the exchange, management and processing of real time and delayed mode data. The Intergovernmental Oceanographic Commission (IOC) operate the International Oceanographic Data and Information Exchange (IODE) program which coordinates the exchange of delayed mode data between national oceanographic data centers, World Data Centers and the user community. The Integrated Global Ocean Services System is a joint IOC/World Meteorological Organization (WMO) program for the exchange and management of real-time data. These two programs are complemented by mechanisms that have been established within scientific programs to exchange and manage project data sets. In particular TOGA and WOCE have identified a data management requirement and established the appropriate infrastructure to achieve this. Where GTSPP fits into this existing framework is discussed.

  12. Filming nuclear dynamics of iodine using x-ray diffraction at the LCLS

    NASA Astrophysics Data System (ADS)

    Ware, Matthew; Natan, Adi; Glownia, James; Cryan, James; Bucksbaum, Phil

    2017-04-01

    We will provide an overview of our analysis of the nuclear dynamics of iodine. At the LCLS, we pumped a gas cell of iodine with a weak 520nm, 50 fs pulse, and the nuclear dynamics are then probed with 9 keV, 40 fs x-rays with variable time delay. This allows us to simultaneously image nuclear wavepackets on the dissociating A state, on the bound B state, and even Raman wavepackets in the ground electronic state. We will explain at length how we isolate each of these signals using a Legendre decomposition of our x-ray data and the selection rules for each of the transitions. Likewise, we will discuss how we convert the x-ray diffraction patterns into real-space movies of the nuclear dynamics. Research supported by the U.S. Department of Energy, Office of Basic Energy Sciences, Atomic, Molecular, and Optical Science Program. Use of LCLS supported under DOE Contract No. DE-AC02-76F00515.

  13. Development of a Low-cost, FPGA-based, Delay Line Particle Detector for Satellite and Sounding Rocket Applications

    NASA Astrophysics Data System (ADS)

    Harrington, M.; Kujawski, J. T.; Adrian, M. L.; Weatherwax, A. T.

    2013-12-01

    Electrons are, by definition, a fundamental, chemical and electromagnetic constituent of any plasma. This is especially true within the partially ionized plasmas of Earth's ionosphere where electrons are a critical component of a vast array of plasma processes. Siena College is working on a novel method of processing information from electron spectrometer anodes using delay line techniques and inexpensive COTS electronics to track the movement of high-energy particles. Electron spectrometers use a variety of techniques to determine where an amplified electron cloud falls onto a collecting surface. One traditional method divides the collecting surface into sectors and uses a single detector for each sector. However, as the angular and spatial resolution increases, so does the number of detectors, increasing power consumption, cost, size, and weight of the system. An alternative approach is to connect each sector with a delay line built within the PCB material which is shielded from cross talk by a flooded ground plane. Only one pair of detectors (e.g., one at each end of the chain) are needed with the delay line technique which is different from traditional delay line detectors which use either Application Specific Integrated Circuits (ASICs) or very fast clocks. In this paper, we report on the implementation and testing of a delay line detector using a low-cost Xilinx FPGA and a thirty-two sector delay system. This Delay Line Detector has potential satellite and rocket flight applications due to its low cost, small size and power efficiency

  14. Site correction of stochastic simulation in southwestern Taiwan

    NASA Astrophysics Data System (ADS)

    Lun Huang, Cong; Wen, Kuo Liang; Huang, Jyun Yan

    2014-05-01

    Peak ground acceleration (PGA) of a disastrous earthquake, is concerned both in civil engineering and seismology study. Presently, the ground motion prediction equation is widely used for PGA estimation study by engineers. However, the local site effect is another important factor participates in strong motion prediction. For example, in 1985 the Mexico City, 400km far from the epicenter, suffered massive damage due to the seismic wave amplification from the local alluvial layers. (Anderson et al., 1986) In past studies, the use of stochastic method had been done and showed well performance on the simulation of ground-motion at rock site (Beresnev and Atkinson, 1998a ; Roumelioti and Beresnev, 2003). In this study, the site correction was conducted by the empirical transfer function compared with the rock site response from stochastic point-source (Boore, 2005) and finite-fault (Boore, 2009) methods. The error between the simulated and observed Fourier spectrum and PGA are calculated. Further we compared the estimated PGA to the result calculated from ground motion prediction equation. The earthquake data used in this study is recorded by Taiwan Strong Motion Instrumentation Program (TSMIP) from 1991 to 2012; the study area is located at south-western Taiwan. The empirical transfer function was generated by calculating the spectrum ratio between alluvial site and rock site (Borcheret, 1970). Due to the lack of reference rock site station in this area, the rock site ground motion was generated through stochastic point-source model instead. Several target events were then chosen for stochastic point-source simulating to the halfspace. Then, the empirical transfer function for each station was multiplied to the simulated halfspace response. Finally, we focused on two target events: the 1999 Chi-Chi earthquake (Mw=7.6) and the 2010 Jiashian earthquake (Mw=6.4). Considering the large event may contain with complex rupture mechanism, the asperity and delay time for each sub-fault is to be concerned. Both the stochastic point-source and the finite-fault model were used to check the result of our correction.

  15. DISCRIMINATION ACQUISITION IN CHILDREN WITH DEVELOPMENTAL DISABILITIES UNDER IMMEDIATE AND DELAYED REINFORCEMENT

    PubMed Central

    Sy, Jolene R.; Vollmer, Timothy R.

    2012-01-01

    We evaluated the discrimination acquisition of individuals with developmental disabilities under immediate and delayed reinforcement. In Experiment 1, discrimination between two alternatives was examined when reinforcement was immediate or delayed by 20 s, 30 s, or 40 s. In Experiment 2, discrimination between 2 alternatives was compared across an immediate reinforcement condition and a delayed reinforcement condition in which subjects could respond during the delay. In Experiment 3, discrimination among 4 alternatives was compared across immediate and delayed reinforcement. In Experiment 4, discrimination between 2 alternatives was examined when reinforcement was immediate and 0-s or 30-s intertrial intervals (ITI) were programmed. For most subjects, discrimination acquisition occurred under immediate reinforcement. However, for some subjects, introducing delays slowed or prevented discrimination acquisition under some conditions. Results from Experiment 4 suggest that longer ITIs cannot account for the lack of discrimination under delayed reinforcement. PMID:23322925

  16. Energy conservation in ad hoc multimedia networks using traffic-shaping mechanisms

    NASA Astrophysics Data System (ADS)

    Chandra, Surendar

    2003-12-01

    In this work, we explore network traffic shaping mechanisms that deliver packets at pre-determined intervals; allowing the network interface to transition to a lower power consuming sleep state. We focus our efforts on commodity devices, IEEE 802.11b ad hoc mode and popular streaming formats. We argue that factors such as the lack of scheduling clock phase synchronization among the participants and scheduling delays introduced by back ground tasks affect the potential energy savings. Increasing the periodic transmission delays to transmit data infrequently can offset some of these effects at the expense of flooding the wireless channel for longer periods of time; potentially increasing the time to acquire the channel for non-multimedia traffic. Buffering mechanisms built into media browsers can mitigate the effects of these added delays from being mis-interpreted as network congestion. We show that practical implementations of such traffic shaping mechanisms can offer significant energy savings.

  17. How Youth Get Engaged: Grounded-Theory Research on Motivational Development in Organized Youth Programs

    ERIC Educational Resources Information Center

    Dawes, Nickki Pearce; Larson, Reed

    2011-01-01

    For youth to benefit from many of the developmental opportunities provided by organized programs, they need to not only attend but become psychologically engaged in program activities. This research was aimed at formulating empirically based grounded theory on the processes through which this engagement develops. Longitudinal interviews were…

  18. The 1980-90 shuttle star catalog for onboard and ground programs

    NASA Technical Reports Server (NTRS)

    Richardson, S.; Killen, R.

    1978-01-01

    The 1980-90 shuttle star catalog for onboard and ground programs is presented. The data used in this catalog are explained according to derivation, input, format for the catalog, and preparation. The tables include the computer program listing, input star position, and the computed star positions for the years 1980-90.

  19. Assessing effects of the e-Chasqui laboratory information system on accuracy and timeliness of bacteriology results in the Peruvian tuberculosis program.

    PubMed

    Blaya, Joaquin A; Shin, Sonya S; Yagui, Martin J A; Yale, Gloria; Suarez, Carmen; Asencios, Luis; Fraser, Hamish

    2007-10-11

    We created a web-based laboratory information system, e-Chasqui to connect public laboratories to health centers to improve communication and analysis. After one year, we performed a pre and post assessment of communication delays and found that e-Chasqui maintained the average delay but eliminated delays of over 60 days. Adding digital verification maintained the average delay, but should increase accuracy. We are currently performing a randomized evaluation of the impacts of e-Chasqui.

  20. Analyzing evacuation versus shelter-in-place strategies after a terrorist nuclear detonation.

    PubMed

    Wein, Lawrence M; Choi, Youngsoo; Denuit, Sylvie

    2010-09-01

    We superimpose a radiation fallout model onto a traffic flow model to assess the evacuation versus shelter-in-place decisions after the daytime ground-level detonation of a 10-kt improvised nuclear device in Washington, DC. In our model, ≈ 80k people are killed by the prompt effects of blast, burn, and radiation. Of the ≈ 360k survivors without access to a vehicle, 42.6k would die if they immediately self-evacuated on foot. Sheltering above ground would save several thousand of these lives and sheltering in a basement (or near the middle of a large building) would save of them. Among survivors of the prompt effects with access to a vehicle, the number of deaths depends on the fraction of people who shelter in a basement rather than self-evacuate in their vehicle: 23.1k people die if 90% shelter in a basement and 54.6k die if 10% shelter. Sheltering above ground saves approximately half as many lives as sheltering in a basement. The details related to delayed (i.e., organized) evacuation, search and rescue, decontamination, and situational awareness (via, e.g., telecommunications) have very little impact on the number of casualties. Although antibiotics and transfusion support have the potential to save ≈ 10k lives (and the number of lives saved from medical care increases with the fraction of people who shelter in basements), the logistical challenge appears to be well beyond current response capabilities. Taken together, our results suggest that the government should initiate an aggressive outreach program to educate citizens and the private sector about the importance of sheltering in place in a basement for at least 12 hours after a terrorist nuclear detonation. © 2010 Society for Risk Analysis.

  1. Bibliography of Regional Aquifer-System Analysis Program of the US Geological Survey, 1978-96

    USGS Publications Warehouse

    Sun, Ren Jen; Weeks, John B.; Grubb, Hayes F.

    1997-01-01

    The Regional Aquifer-System Analysis (RASA) Program of the U.S. Geological Survey was initiated in 1978 and was completed in 1995. The purpose of this program was to define the regional geohydrology and establish a framework of background information on geology, hydrology, and geochemistry of the Nation's important aquifer systems. This information is critically needed to develop an understanding of the Nation's major ground-water flow systems and to support better management of ground-water resources. Twenty-five of the Nation's major aquifer systems were studied under this program. Starting in 1988, the program devoted part of its resources to compilation of a National Ground Water Atlas that presets a comprehensive summary of the Nation's major ground-water resources. The atlas, which is designed in a graphical format supported by descriptive text, serves as a basic reference for the location, geography, geology, and hydrologic characteristics of the major aquifers in the Nation. This bibliography lists 1,105 reports that result from various studies of the program. The list of reports for each study follows a brief description of that study.

  2. Virtual Ultrasound Guidance for Inexperienced Operators

    NASA Technical Reports Server (NTRS)

    Caine, Timothy; Martin, David

    2012-01-01

    Medical ultrasound or echocardiographic studies are highly operator-dependent and generally require lengthy training and internship to perfect. To obtain quality echocardiographic images in remote environments, such as on-orbit, remote guidance of studies has been employed. This technique involves minimal training for the user, coupled with remote guidance from an expert. When real-time communication or expert guidance is not available, a more autonomous system of guiding an inexperienced operator through an ultrasound study is needed. One example would be missions beyond low Earth orbit in which the time delay inherent with communication will make remote guidance impractical. The Virtual Ultrasound Guidance system is a combination of hardware and software. The hardware portion includes, but is not limited to, video glasses that allow hands-free, full-screen viewing. The glasses also allow the operator a substantial field of view below the glasses to view and operate the ultrasound system. The software is a comprehensive video program designed to guide an inexperienced operator through a detailed ultrasound or echocardiographic study without extensive training or guidance from the ground. The program contains a detailed description using video and audio to demonstrate equipment controls, ergonomics of scanning, study protocol, and scanning guidance, including recovery from sub-optimal images. The components used in the initial validation of the system include an Apple iPod Classic third-generation as the video source, and Myvue video glasses. Initially, the program prompts the operator to power-up the ultrasound and position the patient. The operator would put on the video glasses and attach them to the video source. After turning on both devices and the ultrasound system, the audio-video guidance would then instruct on patient positioning and scanning techniques. A detailed scanning protocol follows with descriptions and reference video of each view along with advice on technique. The program also instructs the operator regarding the types of images to store and how to overcome pitfalls in scanning. Images can be forwarded to the ground or other site when convenient. Following study completion, the video glasses, video source, and ultrasound system are powered down and stored. Virtually any equipment that can play back video can be used to play back the program. This includes a DVD player, personal computer, and some MP3 players.

  3. Internal Medicine Program Directors' Perceptions of the "All In" Match Rule: A Cross-Sectional Survey.

    PubMed

    Alweis, Richard; Khan, Muhammad Sohail; Kuehl, Sapna; Wasser, Thomas; Donato, Anthony

    2017-04-01

    Since 2013, the National Resident Matching Program (NRMP) has asked all programs to declare themselves to be "all in" or "all out" for the NRMP. Before this rule was enacted, program directors who were surveyed expressed concerns about what they anticipated with the change, including resources for increased applications and potential delays with residency start times. This study investigated the positive and negative effects of the rule change on recruiting seen from the perspective of internal medicine (IM) program directors. In this mixed model cross-sectional survey, Accreditation Council for Graduate Medical Education-accredited IM program directors were surveyed regarding their impressions of the impact of the policy change. Data were aggregated using constant comparative analysis. A total of 127 of 396 (32%) IM program directors responded, and 122 of 127 (96%) identified their program as "all in." A total of 110 respondents expressed impressions of the rule change, with 48% (53 of 111) reporting positive responses, 28% (31 of 111) neutral responses, and 24% (27 of 111) negative responses. Programs with higher percentages of visa-holding residents had lower positive responses (37% [22 of 60] versus 61% [31 of 51]). Resident quality was felt to be unchanged or improved by most program directors (93%, 103 of 111), yet 24% (27 of 112) reported increases in delayed start times for visa-holding residents. Qualitative analysis identified increased fairness, at the expense of an increase in program resources as a result of the change. A slight majority of residency programs reported a neutral or negative impression of the rule change. Since the rule change, program directors noted increased application volume and delayed residency starts for visa-holding residents.

  4. Bridge-scour analysis using the water surface profile (WSPRO) model

    USGS Publications Warehouse

    Mueller, David S.; ,

    1993-01-01

    A program was developed to extract hydraulic information required for bridge-scour computations, from the Water-Surface Profile computation model (WSPRO). The program is written in compiled BASIC and is menu driven. Using only ground points, the program can compute average ground elevation, cross-sectional area below a specified datum, or create a Drawing Exchange Format (DXF) fie of cross section. Using both ground points ad hydraulic information form the equal-conveyance tubes computed by WSPRO, the program can compute hydraulic parameters at a user-specified station or in a user-specified subsection of the cross section. The program can identify the maximum velocity in a cross section and the velocity and depth at a user-specified station. The program also can identify the maximum velocity in the cross section and the average velocity, average depth, average ground elevation, width perpendicular to the flow, cross-sectional area of flow, and discharge in a subsection of the cross section. This program does not include any help or suggestions as to what data should be extracted; therefore, the used must understand the scour equations and associated variables to the able to extract the proper information from the WSPRO output.

  5. Delayed Triplet-State Formation through Hybrid Charge Transfer Exciton at Copper Phthalocyanine/GaAs Heterojunction.

    PubMed

    Lim, Heeseon; Kwon, Hyuksang; Kim, Sang Kyu; Kim, Jeong Won

    2017-10-05

    Light absorption in organic molecules on an inorganic substrate and subsequent electron transfer to the substrate create so-called hybrid charge transfer exciton (HCTE). The relaxation process of the HCTE states largely determines charge separation efficiency or optoelectronic device performance. Here, the study on energy and time-dispersive behavior of photoelectrons at the hybrid interface of copper phthalocyanine (CuPc)/p-GaAs(001) upon light excitation of GaAs reveals a clear pathway for HCTE relaxation and delayed triplet-state formation. According to the ground-state energy level alignment at the interface, CuPc/p-GaAs(001) shows initially fast hole injection from GaAs to CuPc. Thus, the electrons in GaAs and holes in CuPc form an unusual HCTE state manifold. Subsequent electron transfer from GaAs to CuPc generates the formation of the triplet state in CuPc with a few picoseconds delay. Such two-step charge transfer causes delayed triplet-state formation without singlet excitation and subsequent intersystem crossing within the CuPc molecules.

  6. Note: Large active area solid state photon counter with 20 ps timing resolution and 60 fs detection delay stability

    NASA Astrophysics Data System (ADS)

    Prochazka, Ivan; Kodet, Jan; Eckl, Johann; Blazej, Josef

    2017-10-01

    We are reporting on the design, construction, and performance of a photon counting detector system, which is based on single photon avalanche diode detector technology. This photon counting device has been optimized for very high timing resolution and stability of its detection delay. The foreseen application of this detector is laser ranging of space objects, laser time transfer ground to space and fundamental metrology. The single photon avalanche diode structure, manufactured on silicon using K14 technology, is used as a sensor. The active area of the sensor is circular with 200 μm diameter. Its photon detection probability exceeds 40% in the wavelength range spanning from 500 to 800 nm. The sensor is operated in active quenching and gating mode. A new control circuit was optimized to maintain high timing resolution and detection delay stability. In connection to this circuit, timing resolution of the detector is reaching 20 ps FWHM. In addition, the temperature change of the detection delay is as low as 70 fs/K. As a result, the detection delay stability of the device is exceptional: expressed in the form of time deviation, detection delay stability of better than 60 fs has been achieved. Considering the large active area aperture of the detector, this is, to our knowledge, the best timing performance reported for a solid state photon counting detector so far.

  7. Non-goal-directed recall of specific events in apes after long delays.

    PubMed

    Lewis, Amy; Call, Josep; Berntsen, Dorthe

    2017-07-12

    We examined if apes spontaneously remember one-time, distinctive events across long delays when probed by discriminant cues. Apes witnessed an experimenter hide a cache of food, which they could then retrieve. They retrieved one of two food types; one more distinctive than the other. Two, 10 or 50 weeks later, the apes returned to the same enclosure and found a piece of the previously hidden food on the ground. An experimenter who had not hidden the food was also present. Apes immediately searched the location where the food was previously hidden (no food was here), showing recall of the event. One week later, apes returned to the same enclosure, with the same food on the ground, but now the experimenter that had hidden the food was present. Again, apes immediately searched the hiding location. Apes that had not witnessed the hiding event did not search. There was no significant effect of food type, and retention declined from exposure to the two-week delay, then levelled, consistent with the forgetting curve in humans (Ebbinghaus, H. 1964 Memory: a contribution to experimental psychology (transl. H.A. Ruger & C.E. Bussenvis). New York, NY: Dover. (Original work published 1885.)). This is the first study to show apes can recall a one-time, non-goal-directed event longer than two weeks ago and that apes' recall declines in accordance with a standard retention function. © 2017 The Author(s).

  8. Prediction of forces and moments for flight vehicle control effectors. Part 2: An analysis of delta wing aerodynamic control effectiveness in ground effect

    NASA Technical Reports Server (NTRS)

    Maughmer, Mark D.; Ozoroski, L.; Ozoroski, T.; Straussfogel, D.

    1990-01-01

    Many types of hypersonic aircraft configurations are currently being studied for feasibility of future development. Since the control of the hypersonic configurations throughout the speed range has a major impact on acceptable designs, it must be considered in the conceptual design stage. Here, an investigation of the aerodynamic control effectiveness of highly swept delta planforms operating in ground effect is presented. A vortex-lattice computer program incorporating a free wake is developed as a tool to calculate aerodynamic stability and control derivatives. Data generated using this program are compared to experimental data and to data from other vortex-lattice programs. Results show that an elevon deflection produces greater increments in C sub L and C sub M in ground effect than the same deflection produces out of ground effect and that the free wake is indeed necessary for good predictions near the ground.

  9. Robust optimization for nonlinear time-delay dynamical system of dha regulon with cost sensitivity constraint in batch culture

    NASA Astrophysics Data System (ADS)

    Yuan, Jinlong; Zhang, Xu; Liu, Chongyang; Chang, Liang; Xie, Jun; Feng, Enmin; Yin, Hongchao; Xiu, Zhilong

    2016-09-01

    Time-delay dynamical systems, which depend on both the current state of the system and the state at delayed times, have been an active area of research in many real-world applications. In this paper, we consider a nonlinear time-delay dynamical system of dha-regulonwith unknown time-delays in batch culture of glycerol bioconversion to 1,3-propanediol induced by Klebsiella pneumonia. Some important properties and strong positive invariance are discussed. Because of the difficulty in accurately measuring the concentrations of intracellular substances and the absence of equilibrium points for the time-delay system, a quantitative biological robustness for the concentrations of intracellular substances is defined by penalizing a weighted sum of the expectation and variance of the relative deviation between system outputs before and after the time-delays are perturbed. Our goal is to determine optimal values of the time-delays. To this end, we formulate an optimization problem in which the time delays are decision variables and the cost function is to minimize the biological robustness. This optimization problem is subject to the time-delay system, parameter constraints, continuous state inequality constraints for ensuring that the concentrations of extracellular and intracellular substances lie within specified limits, a quality constraint to reflect operational requirements and a cost sensitivity constraint for ensuring that an acceptable level of the system performance is achieved. It is approximated as a sequence of nonlinear programming sub-problems through the application of constraint transcription and local smoothing approximation techniques. Due to the highly complex nature of this optimization problem, the computational cost is high. Thus, a parallel algorithm is proposed to solve these nonlinear programming sub-problems based on the filled function method. Finally, it is observed that the obtained optimal estimates for the time-delays are highly satisfactory via numerical simulations.

  10. 40 CFR 61.350 - Standards: Delay of repair.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Standards: Delay of repair. 61.350 Section 61.350 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standard for Benzene...

  11. 40 CFR 61.350 - Standards: Delay of repair.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 9 2012-07-01 2012-07-01 false Standards: Delay of repair. 61.350 Section 61.350 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS National Emission Standard for Benzene...

  12. Corrections of stratified tropospheric delays in SAR interferometry: Validation with global atmospheric models

    NASA Astrophysics Data System (ADS)

    Doin, Marie-Pierre; Lasserre, Cécile; Peltzer, Gilles; Cavalié, Olivier; Doubre, Cécile

    2010-05-01

    The main limiting factor on the accuracy of Interferometric SAR measurements (InSAR) comes from phase propagation delays through the troposphere. The delay can be divided into a stratified component, which correlates with the topography and often dominates the tropospheric signal, and a turbulent component. We use Global Atmospheric Models (GAM) to estimate the stratified phase delay and delay-elevation ratio at epochs of SAR acquisitions, and compare them to observed phase delay derived from SAR interferograms. Three test areas are selected with different geographic and climatic environments and with large SAR archive available. The Lake Mead, Nevada, USA is covered by 79 ERS1/2 and ENVISAT acquisitions, the Haiyuan Fault area, Gansu, China, by 24 ERS1/2 acquisitions, and the Afar region, Republic of Djibouti, by 91 Radarsat acquisitions. The hydrostatic and wet stratified delays are computed from GAM as a function of atmospheric pressure P, temperature T, and water vapor partial pressure e vertical profiles. The hydrostatic delay, which depends on ratio P/T, varies significantly at low elevation and cannot be neglected. The wet component of the delay depends mostly on the near surface specific humidity. GAM predicted delay-elevation ratios are in good agreement with the ratios derived from InSAR data away from deforming zones. Both estimations of the delay-elevation ratio can thus be used to perform a first order correction of the observed interferometric phase to retrieve a ground motion signal of low amplitude. We also demonstrate that aliasing of daily and seasonal variations in the stratified delay due to uneven sampling of SAR data significantly bias InSAR data stacks or time series produced after temporal smoothing. In all three test cases, the InSAR data stacks or smoothed time series present a residual stratified delay of the order of the expected deformation signal. In all cases, correcting interferograms from the stratified delay removes all these biases. We quantify the standard error associated with the correction of the stratified atmospheric delay. It varies from one site to another depending on the prevailing atmospheric conditions, but remains bounded by the standard deviation of the daily fluctuations of the stratified delay around the seasonal average. Finally we suggest that the phase delay correction can potentially be improved by introducing a non-linear dependence to the elevation derived from GAM.

  13. Corrections of stratified tropospheric delays in SAR interferometry: Validation with global atmospheric models

    NASA Astrophysics Data System (ADS)

    Doin, M.-P.; Lasserre, C.; Peltzer, G.; Cavalié, O.; Doubre, C.

    2009-09-01

    The main limiting factor on the accuracy of Interferometric SAR measurements (InSAR) comes from phase propagation delays through the troposphere. The delay can be divided into a stratified component, which correlates with the topography and often dominates the tropospheric signal, and a turbulent component. We use Global Atmospheric Models (GAM) to estimate the stratified phase delay and delay-elevation ratio at epochs of SAR acquisitions, and compare them to observed phase delay derived from SAR interferograms. Three test areas are selected with different geographic and climatic environments and with large SAR archive available. The Lake Mead, Nevada, USA is covered by 79 ERS1/2 and ENVISAT acquisitions, the Haiyuan Fault area, Gansu, China, by 24 ERS1/2 acquisitions, and the Afar region, Republic of Djibouti, by 91 Radarsat acquisitions. The hydrostatic and wet stratified delays are computed from GAM as a function of atmospheric pressure P, temperature T, and water vapor partial pressure e vertical profiles. The hydrostatic delay, which depends on ratio P/ T, varies significantly at low elevation and cannot be neglected. The wet component of the delay depends mostly on the near surface specific humidity. GAM predicted delay-elevation ratios are in good agreement with the ratios derived from InSAR data away from deforming zones. Both estimations of the delay-elevation ratio can thus be used to perform a first order correction of the observed interferometric phase to retrieve a ground motion signal of low amplitude. We also demonstrate that aliasing of daily and seasonal variations in the stratified delay due to uneven sampling of SAR data significantly bias InSAR data stacks or time series produced after temporal smoothing. In all three test cases, the InSAR data stacks or smoothed time series present a residual stratified delay of the order of the expected deformation signal. In all cases, correcting interferograms from the stratified delay removes all these biases. We quantify the standard error associated with the correction of the stratified atmospheric delay. It varies from one site to another depending on the prevailing atmospheric conditions, but remains bounded by the standard deviation of the daily fluctuations of the stratified delay around the seasonal average. Finally we suggest that the phase delay correction can potentially be improved by introducing a non-linear dependence to the elevation derived from GAM.

  14. The Efficacy of Parent Counseling and Support Groups on the Stress Levels, Self-Esteem and Degree of Coping of Parents of Developmentally Delayed or Handicapped Children Who Are Involved in an Infant Intervention Program.

    ERIC Educational Resources Information Center

    La Fountain, Rebecca; Geoffroy, Kevin

    This study was conducted to investigate the effect that a parent support group and a counseling group had on the stress levels, self-esteem, and degree of coping of parents (N=48) of developmentally delayed or handicapped infants enrolled in an infant intervention program. It was hypothesized that, compared to parents in the control group, parents…

  15. Evaluation of the impact of ionospheric disturbances on air navigation augmentation system using multi-point GPS receivers

    NASA Astrophysics Data System (ADS)

    Omatsu, N.; Otsuka, Y.; Shiokawa, K.; Saito, S.

    2013-12-01

    In recent years, GPS has been utilized for navigation system for airplanes. Propagation delays in the ionosphere due to total electron content (TEC) between GPS satellite and receiver cause large positioning errors. In precision measurement using GPS, the ionospheric delay correction is generally conducted using both GPS L1 and L2 frequencies. However, L2 frequency is not internationally accepted as air navigation band, so it is not available for positioning directly in air navigation. In air navigation, not only positioning accuracy but safety is important, so augmentation systems are required to ensure the safety. Augmentation systems such as the satellite-based augmentation system (SBAS) or the ground-based augmentation system (GBAS) are being developed and some of them are already in operation. GBAS is available in a relatively narrow area around airports. In general, it corrects for the combined effects of multiple sources of positioning errors simultaneously, including satellite clock and orbital information errors, ionospheric delay errors, and tropospheric delay errors, using the differential corrections broadcast by GBAS ground station. However, if the spatial ionospheric delay gradient exists in the area, correction errors remain even after correction by GBAS. It must be a threat to GBAS. In this study, we use the GPS data provided by the Geographical Survey Institute in Japan. From the GPS data, TEC is obtained every 30 seconds. We select 4 observation points from 24.4 to 35.6 degrees north latitude in Japan, and analyze TEC data of these points from 2001 to 2011. Then we reveal dependences of Rate of TEC change Index (ROTI) on latitude, season, and solar activity statistically. ROTI is the root-mean-square deviation of time subtraction of TEC within 5 minutes. In the result, it is the midnight of the spring and the summer of the solar maximum in the point of 26.4 degrees north latitude that the value of ROTI becomes the largest. We think it is caused by plasma bubbles, and the maximum value of ROTI is about 6 TECU/min. Since it is thought that ROTI is an index representing the spatial ionospheric delay gradient, we can evaluate the effect of spatial ionospheric delay gradient to GBAS. In addition, we will discuss azimuth angle dependence of ROTI. We have found that ROTI tends to be high when the GPS satellites are seen westward. Initial analysis results in Indonesia show a similar feature. This feature could arise from the westward tilt of the plasma bubbles with altitude. More detailed results will be reported in this presentation.

  16. Transmission of magmatic pressure changes at Kilauea volcano

    NASA Astrophysics Data System (ADS)

    Montagna, C. P.; Gonnermann, H. M.

    2012-12-01

    Volcanic eruptions are often accompanied by spatiotemporal migration of ground deformation, a consequence of pressure changes within magma reservoirs and pathways. We have modeled the propagation of such pressure variations, caused by eruptive magma withdrawal during the early eruptive episodes of the ongoing Pu`u `O`o-Kupaianaha eruption of Kilauea volcano. Tilt measurements show that the onset of eruptive episodes at Pu`u `O`o was typically accompanied by abrupt deflation and followed by a sudden onset of gradual re-inflation, once the eruptive episode ended. Tilt of Kilauea's summit underwent similar patterns of deflation and inflation, albeit with a time delay of several hours during most episodes. The observed delay times can be reproduced by a numerical model of pressure variations within an elastic-walled dike that connects Kilauea's summit to its east rift zone. As pressure changes travel through the dike, the interplay between elastic response of the dike wall and viscous resistance of the fluid determines the delay time. An example of the ability of the model to reproduce observed tilt data is presented in Figure 1, which shows measured tilt at Pu`u `O`o during episode 18, together with measured and modeled tilt at Kilauea's summit. Magma withdrawal beneath Pu`u `O`o causes a decrease in pressure and deflation. This pressure change is estimated from observed ground deformation, and it constitutes the time-dependent model boundary condition at Pu`u `O`o, which propagates to Kilauea's summit. The resultant increase in magma flux causes deflation of Kilauea's Halema`uma`u magma reservoir and the change and time delay of tilt are reproduced by the model. The time delay depends on elasticity of the wall rock, dike dimensions, magma viscosity, as well as magnitude and duration of the pressure variations themselves. In addition, these parameters also affect the attenuation of the amplitude of the pressure variation, as it travels between Puu Oo and summit. Pressure changes propagate noticeably faster (slower) in a slightly wider (narrower) dike, as a consequence of smaller (larger) viscous dissipation. Time delays and amplitude of deflation-inflation events at Kilauea have the potential to provide information on effective transport properties of magmatic pathways and changes thereof over time.bserved and modeled change in normalized tilt at Pu`u `O`o and summit for episode 18 of the Pu`u `O`o eruption

  17. Calibration of the KA Band Tracking of the Bepi-Colombo Spacecraft (more Experiment)

    NASA Astrophysics Data System (ADS)

    Barriot, J.; Serafini, J.; Sichoix, L.

    2013-12-01

    The radiosciences Bepi-Colombo MORE experiment will use X/X, X/Ka and Ka/Ka band radio links to make accurate measurements of the spacecraft range and range rate. Tropospheric zenith wet delays range from 1.5 cm to 10 cm, with high variability (less than 1000 s) and will impair these accurate measurements. Conditions vary from summer (worse) to winter (better), from day (worse) to night (better). These wet delays cannot be estimated from ground weather measurements and alternative calibration methods should be used in order to cope with the MORE requirements (no more than 3 mm at 1000 s). Due to the Mercury orbit, MORE measurements will be performed by daylight and more frequently in summer than in winter (from Northern hemisphere). Two systems have been considered to calibrate this wet delay: Water Vapor Radiometers (WVRs) and GPS receivers. The Jet Propulsion Laboratory has developed a new class of WVRs reaching a 5 percent accuracy for the wet delay calibration (0.75 mm to 5 mm), but these WVRs are expensive to build and operate. GPS receivers are also routinely used for the calibration of data from NASA Deep Space probes, but several studies have shown that GPS receivers can give good calibration (through wet delay mapping functions) for long time variations, but are not accurate enough for short time variations (100 to 1000 s), and that WVRs must be used to efficiently calibrate the wet troposphere delays over such time spans. We think that such a calibration could be done by assimilating data from all the GNSS constellations (GPS, GLONASS, Galileo, Beidou and IRNSS) that will be available at the time of the Bepi-Colombo arrival at Mercury (2021), provided that the underlying physics of the turbulent atmosphere and evapotranspiration processes are properly taken into account at such time scales. This implies to do a tomographic image of the troposphere overlying each Deep Space tracking station at time scales of less than 1000 s. For this purpose, we have developed a full representation of the wet refractivity of the atmosphere over the ground station along a basis of 3D Zernike functions with time-variable coefficients. We detail the algorithm that is used to constraint the inverse imaging of the wet troposphere at the target time scales, and give examples of such imaging from GPS data only.

  18. Real-time observation of intramolecular proton transfer in the electronic ground state of chloromalonaldehyde: an ab initio study of time-resolved photoelectron spectra.

    PubMed

    do N Varella, Márcio T; Arasaki, Yasuki; Ushiyama, Hiroshi; Takatsuka, Kazuo; Wang, Kwanghsi; McKoy, Vincent

    2007-02-07

    The authors report on studies of time-resolved photoelectron spectra of intramolecular proton transfer in the ground state of chloromalonaldehyde, employing ab initio photoionization matrix elements and effective potential surfaces of reduced dimensionality, wherein the couplings of proton motion to the other molecular vibrational modes are embedded by averaging over classical trajectories. In the simulations, population is transferred from the vibrational ground state to vibrationally hot wave packets by pumping to an excited electronic state and dumping with a time-delayed pulse. These pump-dump-probe simulations demonstrate that the time-resolved photoelectron spectra track proton transfer in the electronic ground state well and, furthermore, that the geometry dependence of the matrix elements enhances the tracking compared with signals obtained with the Condon approximation. Photoelectron kinetic energy distributions arising from wave packets localized in different basins are also distinguishable and could be understood, as expected, on the basis of the strength of the optical couplings in different regions of the ground state potential surface and the Franck-Condon overlaps of the ground state wave packets with the vibrational eigenstates of the ion potential surface.

  19. Distributed intelligence for ground/space systems

    NASA Technical Reports Server (NTRS)

    Aarup, Mads; Munch, Klaus Heje; Fuchs, Joachim; Hartmann, Ralf; Baud, Tim

    1994-01-01

    DI is short for Distributed Intelligence for Ground/Space Systems and the DI Study is one in a series of ESA projects concerned with the development of new concepts and architectures for future autonomous spacecraft systems. The kick-off of DI was in January 1994 and the planned duration is three years. The background of DI is the desire to design future ground/space systems with a higher degree of autonomy than seen in today's missions. The aim of introducing autonomy in spacecraft systems is to: (1) lift the role of the spacecraft operators from routine work and basic troubleshooting to supervision; (2) ease access to and increase availability of spacecraft resources; (3) carry out basic mission planning for users; (4) enable missions which have not yet been feasible due to eg. propagation delays, insufficient ground station coverage etc.; and (5) possibly reduce mission cost. The study serves to identify the feasibility of using state-of-the-art technologies in the area of planning, scheduling, fault detection using model-based diagnosis and knowledge processing to obtain a higher level of autonomy in ground/space systems.

  20. The effectiveness of parent participation in occupational therapy for children with developmental delay

    PubMed Central

    Lin, Chien-Lin; Lin, Chin-Kai; Yu, Jia-Jhen

    2018-01-01

    Introduction This study aims to explore the impact of Parent Participation Program on the development of developmental delay children. Methods Pretest-posttest equivalent-group experimental design study was used in this paper. A total of 30 pairs of developmental delay children aged 0–72 months and their parents participated into this study. They were divided into two groups, namely control group and experimental group, according to parents’ wishes. The objects of study in control group received 16 courses of direct rehabilitation therapy; those in experimental group received 8 courses of direct rehabilitation therapy and 8 courses of instruction and tracking of Parent Participation Program. The duration of the intervention was 8 weeks. All cases should be evaluated before and after the intervention, to analyze the difference before and after intervention and among groups. The statistical methods in this paper included descriptive analysis, Chi-square test, independent sample t-test, pair-sample t-test. Results and conclusion The intervention of Parent Participation Occupational Program has positive impact on the development of developmental delay children in various fields. Among all the intervention results, the progress of the experimental group is 1.895 times more than that of the control group. With parent involvement, Parent Participation Occupational Therapy can promote the cognitive ability, language ability, action ability (gross and fine movement), social competence and self-care ability of children with developmental delay. Finally, the researcher presents suggestions and directions for future research in accordance with the results. PMID:29503546

  1. Application of GPS Measurements for Ionospheric and Tropospheric Modelling

    NASA Astrophysics Data System (ADS)

    Rajendra Prasad, P.; Abdu, M. A.; Furlan, Benedito. M. P.; Koiti Kuga, Hélio

    military navigation. The DOD's primary purposes were to use the system in precision weapon delivery and providing a capability that would help reverse the proliferation of navigation systems in military. Subsequently, it was very quickly realized that civil use and scientific utility would far outstrip military use. A variety of scientific applications are uniquely suited to precise positioning capabilities. The relatively high precision, low cost, mobility and convenience of GPS receivers make positioning attractive. The other applications being precise time measurement, surveying and geodesy purposes apart from orbit and attitude determination along with many user services. The system operates by transmitting radio waves from satellites to receivers on the ground, aircraft, or other satellites. These signals are used to calculate location very accurately. Standard Positioning Services (SPS) which restricts access to Coarse/Access (C/A) code and carrier signals on the L1 frequency only. The accuracy thus provided by SPS fall short of most of the accuracy requirements of users. The upper atmosphere is ionized by the ultra violet radiation from the sun. The significant errors in positioning can result when the signals are refracted and slowed by ionospheric conditions, the parameter of the ionosphere that produces most effects on GPS signals is the total number of electrons in the ionospheric propagation path. This integrated number of electrons, called Total Electron Content (TEC) varies, not only from day to night, time of the year and solar flux cycle, but also with geomagnetic latitude and longitude. Being plasma the ionosphere affects the radio waves propagating through it. Effects of scintillation on GPS satellite navigation systems operating at L1 (1.5754 GHz), L2 (1.2276 GHz) frequencies have not been estimated accurately. It is generally recognized that GPS navigation systems are vulnerable in the polar and especially in the equatorial region during the solar maximum period. In the equatorial region the irregularity structures are highly elongated in the north-south direction and are discrete in the east-west direction with dimensions of several hundred km. With such spatial distribution of irregularities needs to determine how often the GPS receivers fails to provide navigation aid with the available constellation. The effects of scintillation on the performance of GPS navigation systems in the equatorial region can be analyzed through commissioning few ground receivers. Incidentally there are few GPS receivers near these latitudes. Despite the recent advances in the ionosphere and tropospheric delay modeling for geodetic applications of GPS, the models currently used are not very precise. The conventional and operational ionosphere models viz. Klobuchar, Bent, and IRI models have certain limitations in providing very precise accuracies at all latitudes. The troposphere delay modeling also suffers in accuracy. The advances made in both computing power and knowledge of the atmosphere leads to make an effort to upgrade some of these models for improving delay corrections in GPS navigation. The ionospheric group delay corrections for orbit determination can be minimized using duel frequency. However in single frequency measurements the group delay correction is an involved task. In this paper an investigation is carried out to estimate the model coefficients of ionosphere along with precise orbit determination modeling using GPS measurements. The locations of the ground-based receivers near equator are known very exactly. Measurements from these ground stations to a precisely known satellite carrying duel receiver is used for orbit determination. The ionosphere model parameters can be refined corresponding to spatially distributed GPS receivers spread over Brazil. The tropospheric delay effects are not significant for the satellites by choosing appropriate elevation angle. However it needs to be analyzed for user like aircraft for an effective use. In this paper brief description of GPS data utilization, Navigational message, orbit computation and precise orbit determination and Ionosphere and troposphere models are summarized. The methodology towards refining ionosphere model coefficients is presented. Some of the plots and results related to orbit determination are presented. The study demonstrated the feasibility of estimating ionosphere group delay at specific latitudes and could be improved through refining some of the model coefficients using GPS measurements. It is possible to accurately determine the tropospheric delay, which may be used for an aircraft in flight without access to real time meteorological information.

  2. House Wrens adjust laying dates and clutch size in relation to annual flooding

    Treesearch

    Deborah M. Finch

    1991-01-01

    I examined timing of reproduction and productivity in box-nesting House Wrens (Troglodytes aedon) inhabiting three riverbank woodlands subjected to different levels of flooding. In years when the North Platte River flooded its banks submerging ground foraging substrates, dates of nest initiation and egg laying in two wren populations were delayed and nonsynchronized....

  3. 34 CFR 101.32 - Signature of documents.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 1 2013-07-01 2013-07-01 false Signature of documents. 101.32 Section 101.32 Education..., information, and belief there is good ground to support it, and that it is not interposed for delay. If a... as sham and false and the proceeding may proceed as though the document had not been filed. Similar...

  4. 34 CFR 101.32 - Signature of documents.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 1 2014-07-01 2014-07-01 false Signature of documents. 101.32 Section 101.32 Education..., information, and belief there is good ground to support it, and that it is not interposed for delay. If a... as sham and false and the proceeding may proceed as though the document had not been filed. Similar...

  5. 34 CFR 101.32 - Signature of documents.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Signature of documents. 101.32 Section 101.32 Education..., information, and belief there is good ground to support it, and that it is not interposed for delay. If a... as sham and false and the proceeding may proceed as though the document had not been filed. Similar...

  6. 34 CFR 101.32 - Signature of documents.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 1 2012-07-01 2012-07-01 false Signature of documents. 101.32 Section 101.32 Education..., information, and belief there is good ground to support it, and that it is not interposed for delay. If a... as sham and false and the proceeding may proceed as though the document had not been filed. Similar...

  7. 34 CFR 101.32 - Signature of documents.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 1 2011-07-01 2011-07-01 false Signature of documents. 101.32 Section 101.32 Education..., information, and belief there is good ground to support it, and that it is not interposed for delay. If a... as sham and false and the proceeding may proceed as though the document had not been filed. Similar...

  8. CloudSat Safety Operations at Vandenberg AFB

    NASA Technical Reports Server (NTRS)

    Greenberg, Steve

    2006-01-01

    CloudSat safety operations at Vendenberg AFB is given. The topics include: 1) CloudSat Project Overview; 2) Vandenberg Ground Operations; 3) Delta II Launch Vehicle; 4) The A-Train; 5) System Safety Management; 6) CALIPSO Hazards Assessment; 7) CALIPSO Supplemental Safeguards; 8) Joint System Safety Operations; 9) Extended Stand-down; 10) Launch Delay Safety Concerns; and 11) Lessons Learned.

  9. Dynamic analysis of space robot remote control system

    NASA Astrophysics Data System (ADS)

    Kulakov, Felix; Alferov, Gennady; Sokolov, Boris; Gorovenko, Polina; Sharlay, Artem

    2018-05-01

    The article presents analysis on construction of two-stage remote control for space robots. This control ensures efficiency of the robot control system at large delays in transmission of control signals from the ground control center to the local control system of the space robot. The conditions for control stability of and high transparency are found.

  10. 9 CFR 416.2 - Establishment grounds and facilities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... ACT SANITATION § 416.2 Establishment grounds and facilities. (a) Grounds and pest control. The grounds... place a pest management program to prevent the harborage and breeding of pests on the grounds and within establishment facilities. Pest control substances used must be safe and effective under the conditions of use...

  11. 9 CFR 416.2 - Establishment grounds and facilities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... ACT SANITATION § 416.2 Establishment grounds and facilities. (a) Grounds and pest control. The grounds... place a pest management program to prevent the harborage and breeding of pests on the grounds and within establishment facilities. Pest control substances used must be safe and effective under the conditions of use...

  12. 9 CFR 416.2 - Establishment grounds and facilities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... ACT SANITATION § 416.2 Establishment grounds and facilities. (a) Grounds and pest control. The grounds... place a pest management program to prevent the harborage and breeding of pests on the grounds and within establishment facilities. Pest control substances used must be safe and effective under the conditions of use...

  13. 40 CFR 141.401 - Sanitary surveys for ground water systems.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 23 2011-07-01 2011-07-01 false Sanitary surveys for ground water...) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Ground Water Rule § 141.401 Sanitary surveys for ground water systems. (a) Ground water systems must provide the State, at the State's...

  14. Effect of the Children’s Health Activity Motor Program on Motor Skills and Self-Regulation in Head Start Preschoolers: An Efficacy Trial

    PubMed Central

    Robinson, Leah E.; Palmer, Kara K.; Bub, Kristen L.

    2016-01-01

    Self-regulatory skills are broadly defined as the ability to manage emotions, focus attention, and inhibit some behaviors while activating others in accordance with social expectations and are an established indicator of academic success. Growing evidence links motor skills and physical activity to self-regulation. This study examined the efficacy of a motor skills intervention (i.e., the Children’s Health Activity Motor Program, CHAMP) that is theoretically grounded in Achievement Goal Theory on motor skill performance and self-regulation in Head Start preschoolers. A sample of 113 Head Start preschoolers (Mage = 51.91 ± 6.5 months; 49.5% males) were randomly assigned to a treatment (n = 68) or control (n = 45) program. CHAMP participants engaged in 15, 40-min sessions of a mastery climate intervention that focused on the development of motor skills over 5 weeks while control participants engaged in their normal outdoor recess period. The Delay of Gratification Snack Task was used to measure self-regulation and the Test of Gross Motor Development-2nd Edition was used to assess motor skills. All measures were assessed prior to and following the intervention. Linear mixed models were fit for both self-regulation and motor skills. Results revealed a significant time × treatment interaction (p < 0.001). In regard to motor skills, post hoc comparisons found that all children improved their motor skills (p < 0.05), but the CHAMP group improved significantly more than the control group (p < 0.001). Children in CHAMP maintained their self-regulation scores across time, while children in the control group scored significantly lower than the CHAMP group at the posttest (p < 0.05). CHAMP is a mastery climate movement program that enhance skills associated with healthy development in children (i.e., motor skills and self-regulation). This efficacy trial provided evidence that CHAMP helped maintain delay of gratification in preschool age children and significantly improved motor skills while participating in outdoor recess was not effective. CHAMP could help contribute to children’s learning-related skills and physical development and subsequently to their academic success. PMID:27660751

  15. Effects of time delay and pitch control sensitivity in the flared landing

    NASA Technical Reports Server (NTRS)

    Berthe, C. J.; Chalk, C. R.; Wingarten, N. C.; Grantham, W.

    1986-01-01

    Between December 1985 and January 1986, a flared landing program was conducted, using the USAF Total In-Flight simulator airplane, to examine time delay effects in a formal manner. Results show that as pitch sensitivity is increased, tolerance to time delay decreases. With the proper selection of pitch sensitivity, Level I performance was maintained with time delays ranging from 150 milliseconds to greater than 300 milliseconds. With higher sensitivity, configurations with Level I performance at 150 milliseconds degraded to level 2 at 200 milliseconds. When metrics of time delay and pitch sensitivity effects are applied to enhance previously developed predictive criteria, the result is an improved prediction technique which accounts for significant closed loop items.

  16. Education on the Brain: A Partnership Between a Pediatric Primary Care Center and Neurology Residency.

    PubMed

    Zwemer, Eric; Bernson-Leung, Miya; Rea, Corinna; Patel, Archana A; Guerriero, Rejean; Urion, David K; Toomey, Sara L

    2018-01-01

    The national shortage of pediatric neurologists is worsening, yet referral rates by pediatricians are high. Suboptimal training of pediatric residents in care of patients with neurologic disease may be a contributing factor. We formed a partnership between the Boston Children's Primary Care at Longwood clinic and Child Neurology Residency Training Program. The educational intervention included lectures, observed neurologic examinations, in-person and virtual triage, and an electronic medical record-based consult system. Residents in other primary care clinics served as the comparison group. Intervention-group residents reported significantly improved confidence in diagnosis of chronic/recurrent headache, attention deficit hyperactivity disorder (ADHD), and developmental delay; initial management of ADHD and developmental delay; and secondary management of ADHD, developmental delay, and concussion/traumatic brain injury. Comparison-group residents reported significantly improved confidence only in diagnosis of developmental delay. Our multipronged intervention is a promising approach to improving pediatric resident training in pediatric neurology and may be generalizable to subspecialty collaborations for other residency programs.

  17. Annual summary of ground-water conditions in Arizona, spring 1982 to spring 1983

    USGS Publications Warehouse

    ,

    1984-01-01

    The withdrawal of ground water was slightly less than 4.2 million acre-feet in Arizona in 1982, which is about 1.2 million acre-feet less than the amount withdrawn in 1981. Most of the decrease in 1982 was in the amount of ground water used for irrigation in the Basin and Range lowlands province. Through 1982, slightly more than 193 million acre-feet of ground water had been withdrawn from the ground-water reservoirs in Arizona. The report contains three small-scale maps that show ground-water pumpage by areas, the status of the ground-water inventory and observation-well program, and the ground-water quality sampling program. The main map, which is at a scale of 1:500,000, shows potential well production, depth to water in selected wells in spring 1983, and change in water level in selected wells from 1978 to 1983. A brief text summarizes the current ground-water conditions in the State. (USGS)

  18. Understanding the Importance and Practice of Credible Leadership at Program Executive Office Ground Combat Systems (PEO GCS) and Program Executive Office Combat Support and Combat Service Support (PEO CS and CSS)

    DTIC Science & Technology

    2017-03-30

    and Program Executive Office Combat Support and Combat Service Support (PEO CS&CSS) Chad P. Stocker March 30, 2017 Submitted to...to Defense Acquisition University in partial fulfillment of the requirement of the Senior Service College Fellowship CREDIBLE LEADERSHIP AT PEO...of Credible Leadership at Program Executive Office Ground Combat Systems (PEO GCS) and Program Executive Office Combat Support and Combat Service

  19. Aircraft and ground vehicle friction correlation test results obtained under winter runway conditions during joint FAA/NASA Runway Friction Program

    NASA Technical Reports Server (NTRS)

    Yager, Thomas J.; Vogler, William A.; Baldasare, Paul

    1988-01-01

    Aircraft and ground vehicle friction data collected during the Joint FAA/NASA Runway Friction Program under winter runway conditions are discussed and test results are summarized. The relationship between the different ground vehicle friction measurements obtained on compacted snow- and ice-covered conditions is defined together with the correlation to aircraft tire friction performance under similar runway conditions.

  20. The changes of lumbar muscle flexion-relaxation phenomenon due to antero-posteriorly slanted ground surfaces.

    PubMed

    Hu, Boyi; Ning, Xiaopeng; Dai, Fei; Almuhaidib, Ibrahim

    2016-09-01

    Uneven ground surface is a common occupational injury risk factor in industries such as agriculture, fishing, transportation and construction. Studies have shown that antero-posteriorly slanted ground surfaces could reduce spinal stability and increase the risk of falling. In this study, the influence of antero-posteriorly slanted ground surfaces on lumbar flexion-relaxation responses was investigated. Fourteen healthy participants performed sagittally symmetric and asymmetric trunk bending motions on one flat and two antero-posteriorly slanted surfaces (-15° (uphill facing) and 15° (downhill facing)), while lumbar muscle electromyography and trunk kinematics were recorded. Results showed that standing on a downhill facing slanted surface delays the onset of lumbar muscle flexion-relaxation phenomenon (FRP), while standing on an uphill facing ground causes lumbar muscle FRP to occur earlier. In addition, compared to symmetric bending, when performing asymmetric bending, FRP occurred earlier on the contralateral side of lumbar muscles and significantly smaller maximum lumbar flexion and trunk inclination angles were observed. Practitioner Summary: Uneven ground surface is a common risk factor among a number of industries. In this study, we investigated the influence of antero-posteriorly slanted ground surface on trunk biomechanics during trunk bending. Results showed the slanted surface alters the lumbar tissue load-sharing mechanism in both sagittally symmetric and asymmetric bending.

  1. Acoustic Transducers as Passive Cooperative Targets for Wireless Sensing of the Sub-Surface World: Challenges of Probing with Ground Penetrating RADAR

    PubMed Central

    Martin, Gilles; Goavec-Mérou, Gwenhael; Rabus, David; Alzuaga, Sébastien; Arapan, Lilia; Sagnard, Marianne; Carry, Émile

    2018-01-01

    Passive wireless transducers are used as sensors, probed by a RADAR system. A simple way to separate the returning signal from the clutter is to delay the response, so that the clutter decays before the echoes are received. This can be achieved by introducing a fixed delay in the sensor design. Acoustic wave transducers are ideally suited as cooperative targets for passive, wireless sensing. The incoming electromagnetic pulse is converted into an acoustic wave, propagated on the sensor substrate surface, and reflected as an electromagnetic echo. According to a known law, the acoustic wave propagation velocity depends on the physical quantity under investigation, which is then measured as an echo delay. Both conversions between electromagnetic and acoustic waves are based on the piezoelectric property of the substrate of which the sensor is made. Investigating underground sensing, we address the problems of using GPR (Ground-Penetrating RADAR) for probing cooperative targets. The GPR is a good candidate for this application because it provides an electromagnetic source and receiver, as well as echo recording tools. Instead of designing dedicated electronics, we choose a commercially available, reliable and rugged instrument. The measurement range depends on parameters like antenna radiation pattern, radio spectrum matching between GPR and the target, antenna-sensor impedance matching and the transfer function of the target. We demonstrate measurements at depths ranging from centimeters to circa 1 m in a sandbox. In our application, clutter rejection requires delays between the emitted pulse and echoes to be longer than in the regular use of the GPR for geophysical measurements. This delay, and the accuracy needed for sensing, challenge the GPR internal time base. In the GPR units we used, the drift turns out to be incompatible with the targeted application. The available documentation of other models and brands suggests that this is a rather general limitation. We solved the problem by replacing the analog ramp generator defining the time base with a fully digital solution, whose time accuracy and stability relies on a quartz oscillator. The resulting stability is acceptable for sub-surface cooperative sensor measurement. PMID:29337914

  2. Acoustic Transducers as Passive Cooperative Targets for Wireless Sensing of the Sub-Surface World: Challenges of Probing with Ground Penetrating RADAR.

    PubMed

    Friedt, Jean-Michel; Martin, Gilles; Goavec-Mérou, Gwenhael; Rabus, David; Alzuaga, Sébastien; Arapan, Lilia; Sagnard, Marianne; Carry, Émile

    2018-01-16

    Passive wireless transducers are used as sensors, probed by a RADAR system. A simple way to separate the returning signal from the clutter is to delay the response, so that the clutter decays before the echoes are received. This can be achieved by introducing a fixed delay in the sensor design. Acoustic wave transducers are ideally suited as cooperative targets for passive, wireless sensing. The incoming electromagnetic pulse is converted into an acoustic wave, propagated on the sensor substrate surface, and reflected as an electromagnetic echo. According to a known law, the acoustic wave propagation velocity depends on the physical quantity under investigation, which is then measured as an echo delay. Both conversions between electromagnetic and acoustic waves are based on the piezoelectric property of the substrate of which the sensor is made. Investigating underground sensing, we address the problems of using GPR (Ground-Penetrating RADAR) for probing cooperative targets. The GPR is a good candidate for this application because it provides an electromagnetic source and receiver, as well as echo recording tools. Instead of designing dedicated electronics, we choose a commercially available, reliable and rugged instrument. The measurement range depends on parameters like antenna radiation pattern, radio spectrum matching between GPR and the target, antenna-sensor impedance matching and the transfer function of the target. We demonstrate measurements at depths ranging from centimeters to circa 1 m in a sandbox. In our application, clutter rejection requires delays between the emitted pulse and echoes to be longer than in the regular use of the GPR for geophysical measurements. This delay, and the accuracy needed for sensing, challenge the GPR internal time base. In the GPR units we used, the drift turns out to be incompatible with the targeted application. The available documentation of other models and brands suggests that this is a rather general limitation. We solved the problem by replacing the analog ramp generator defining the time base with a fully digital solution, whose time accuracy and stability relies on a quartz oscillator. The resulting stability is acceptable for sub-surface cooperative sensor measurement.

  3. Stochastic summation of empirical Green's functions

    USGS Publications Warehouse

    Wennerberg, Leif

    1990-01-01

    Two simple strategies are presented that use random delay times for repeatedly summing the record of a relatively small earthquake to simulate the effects of a larger earthquake. The simulations do not assume any fault plane geometry or rupture dynamics, but realy only on the ω−2 spectral model of an earthquake source and elementary notions of source complexity. The strategies simulate ground motions for all frequencies within the bandwidth of the record of the event used as a summand. The first strategy, which introduces the basic ideas, is a single-stage procedure that consists of simply adding many small events with random time delays. The probability distribution for delays has the property that its amplitude spectrum is determined by the ratio of ω−2 spectra, and its phase spectrum is identically zero. A simple expression is given for the computation of this zero-phase scaling distribution. The moment rate function resulting from the single-stage simulation is quite simple and hence is probably not realistic for high-frequency (>1 Hz) ground motion of events larger than ML∼ 4.5 to 5. The second strategy is a two-stage summation that simulates source complexity with a few random subevent delays determined using the zero-phase scaling distribution, and then clusters energy around these delays to get an ω−2 spectrum for the sum. Thus, the two-stage strategy allows simulations of complex events of any size for which the ω−2 spectral model applies. Interestingly, a single-stage simulation with too few ω−2records to get a good fit to an ω−2 large-event target spectrum yields a record whose spectral asymptotes are consistent with the ω−2 model, but that includes a region in its spectrum between the corner frequencies of the larger and smaller events reasonably approximated by a power law trend. This spectral feature has also been discussed as reflecting the process of partial stress release (Brune, 1970), an asperity failure (Boatwright, 1984), or the breakdown of ω−2 scaling due to rupture significantly longer than the width of the seismogenic zone (Joyner, 1984).

  4. Are superhydrophobic surfaces best for icephobicity?

    PubMed

    Jung, Stefan; Dorrestijn, Marko; Raps, Dominik; Das, Arindam; Megaridis, Constantine M; Poulikakos, Dimos

    2011-03-15

    Ice formation can have catastrophic consequences for human activity on the ground and in the air. Here we investigate water freezing delays on untreated and coated surfaces ranging from hydrophilic to superhydrophobic and use these delays to evaluate icephobicity. Supercooled water microdroplets are inkjet-deposited and coalesce until spontaneous freezing of the accumulated mass occurs. Surfaces with nanometer-scale roughness and higher wettability display unexpectedly long freezing delays, at least 1 order of magnitude longer than typical superhydrophobic surfaces with larger hierarchical roughness and low wettability. Directly related to the main focus on heterogeneous nucleation and freezing delay of supercooled water droplets, the observed ensuing crystallization process consisted of two distinct phases: one very rapid recalescent partial solidification phase and a subsequent slower phase. Observations of the droplet collision process employed for the continuous liquid mass accumulation up to the point of ice formation reveal a previously unseen atmospheric-pressure, subfreezing-temperature regime for liquid-on-liquid bounce. On the basis of the entropy reduction of water near a solid surface, we formulate a modification to the classical heterogeneous nucleation theory, which predicts the observed freezing delay trends. Our results bring to question recent emphasis on super water-repellent surface formulations for ice formation retardation and suggest that anti-icing design must optimize the competing influences of both wettability and roughness.

  5. X-ray Reverberation Mapping of Ci Cam

    NASA Astrophysics Data System (ADS)

    Bartlett, Elizabeth; Garcia, M.

    2009-01-01

    We have analyzed the X-ray lightcurve of the star CI Cam, the optical counterpart of the X-ray transient XTE J0421+56 using data from XMM-Newton. Our motivation is based on evidence from ground based optical interferometry from the Keck and IOTA observatories which suggests that the dust surrounding CI CAM has a taurus morphology rather than a spherical distribution as previously hypothesized. By using a technique known as reverberation mapping we have constrained the time delay between the continuum of CI Cam and the Fe-K fluorescence line, corresponding to the reflection of the continuum off the dusty taurus. The time delay yields information on the size of the taurus.

  6. Contingent plan structures for spacecraft

    NASA Technical Reports Server (NTRS)

    Drummond, M.; Currie, K.; Tate, A.

    1987-01-01

    Most current AI planners build partially ordered plan structures which delay decisions on action ordering. Such structures cannot easily represent contingent actions. A representation which can is presented. The representation has some other useful features: it provides a good account of the causal structure of a plan, can be used to describe disjunctive actions, and it offers a planner the opportunity of even less commitment than the classical partial order on actions. The use of this representation is demonstrated in an on-board spacecraft activity sequencing problem. Contingent plan execution in a spacecraft context highlights the requirements for a fully disjunctive representation, since communication delays often prohibit extensive ground-based accounting for remotely sensed information and replanning on execution failure.

  7. Annual report to the NASA Administrator by the Aerospace Safety Advisory Panel on the space shuttle program. Part 2: Summary of information developed in the panel's fact-finding activities

    NASA Technical Reports Server (NTRS)

    1976-01-01

    Safety management areas of concern include the space shuttle main engine, shuttle avionics, orbiter thermal protection system, the external tank program, and the solid rocket booster program. The ground test program and ground support equipment system were reviewed. Systems integration and technical 'conscience' were of major priorities for the investigating teams.

  8. Decrypting geophysical signals at Stromboli Volcano (Italy): Integration of seismic and Ground-Based InSAR displacement data

    PubMed Central

    Di Traglia, F; Cauchie, L; Casagli, N; Saccorotti, G

    2014-01-01

    We present the integration of seismic and Ground-Based Interferometric Synthetic Aperture Radar system (GBInSAR) displacement data at Stromboli Volcano. Ground deformation in the area of summit vents is positively correlated with both seismic tremor amplitude and cumulative amplitudes of very long period (VLP) signals associated with Strombolian explosions. Changes in VLP amplitudes precede by a few days the variations in ground deformation and seismic tremor. We propose a model where the arrival of fresh, gas-rich magma from depth enhances gas slug formation, promoting convection and gas transfer throughout the conduit system. At the shallowest portion of the conduit, an increase in volatile content causes a density decrease, expansion of the magmatic column and augmented degassing activity, which respectively induce inflation of the conduit, and increased tremor amplitudes. The temporal delay between increase of VLP and tremor amplitudes/conduit inflation can be interpreted in terms of the different timescales characterizing bulk gas transfer versus slug formation and ascent. PMID:25821278

  9. Decrypting geophysical signals at Stromboli Volcano (Italy): Integration of seismic and Ground-Based InSAR displacement data.

    PubMed

    Di Traglia, F; Cauchie, L; Casagli, N; Saccorotti, G

    2014-04-28

    We present the integration of seismic and Ground-Based Interferometric Synthetic Aperture Radar system (GBInSAR) displacement data at Stromboli Volcano. Ground deformation in the area of summit vents is positively correlated with both seismic tremor amplitude and cumulative amplitudes of very long period (VLP) signals associated with Strombolian explosions. Changes in VLP amplitudes precede by a few days the variations in ground deformation and seismic tremor. We propose a model where the arrival of fresh, gas-rich magma from depth enhances gas slug formation, promoting convection and gas transfer throughout the conduit system. At the shallowest portion of the conduit, an increase in volatile content causes a density decrease, expansion of the magmatic column and augmented degassing activity, which respectively induce inflation of the conduit, and increased tremor amplitudes. The temporal delay between increase of VLP and tremor amplitudes/conduit inflation can be interpreted in terms of the different timescales characterizing bulk gas transfer versus slug formation and ascent.

  10. Obtaining Reliable Predictions of Terrestrial Energy Coupling From Real-Time Solar Wind Measurement

    NASA Technical Reports Server (NTRS)

    Weimer, Daniel R.

    2001-01-01

    The first draft of a manuscript titled "Variable time delays in the propagation of the interplanetary magnetic field" has been completed, for submission to the Journal of Geophysical Research. In the preparation of this manuscript all data and analysis programs had been updated to the highest temporal resolution possible, at 16 seconds or better. The program which computes the "measured" IMF propagation time delays from these data has also undergone another improvement. In another significant development, a technique has been developed in order to predict IMF phase plane orientations, and the resulting time delays, using only measurements from a single satellite at L1. The "minimum variance" method is used for this computation. Further work will be done on optimizing the choice of several parameters for the minimum variance calculation.

  11. Flapping current sheet with superposed waves seen in space and on the ground

    NASA Astrophysics Data System (ADS)

    Wang, G. Q.; Volwerk, M.; Nakamura, R.; Boakes, P.; Zhang, T. L.; Yoshikawa, A.; Baishev, D. G.

    2014-12-01

    A wavy current sheet event observed on 15 October 2004 between 1235 and 1300 UT has been studied by using Cluster and ground-based magnetometer data. Waves propagating from the tail center to the duskside flank with a period ~30 s and wavelength ~1 RE are superimposed on a flapping current sheet, accompanied with a bursty bulk flow. Three Pi2 pulsations, with onset at ~1236, ~1251, and ~1255 UT, respectively, are observed at the Tixie station located near the foot points of Cluster. The mechanism creating the Pi2 (period ~40 s) onset at ~1236 UT is unclear. The second Pi2 (period ~90 s, onset at ~1251 UT) is associated with a strong field-aligned current, which has a strong transverse component of the magnetic field, observed by Cluster with a time delay ~60 s. We suggest that it is caused by bouncing Alfvén waves between the northern and southern ionosphere which transport the field-aligned current. For the third Pi2 (period ~60 s) there is almost no damping at the first three periods. They occur in conjunction with periodic field-aligned currents one-on-one with 72 s delay. We suggest that it is generated by these periodic field-aligned currents. We conclude that the strong field-aligned currents generated in the plasma sheet during flapping with superimposed higher-frequency waves can drive Pi2 pulsations on the ground, and periodic field-aligned currents can even control the period of the Pi2s.

  12. Effectiveness of Motor Skill Intervention Varies Based on Implementation Strategy

    ERIC Educational Resources Information Center

    Brian, Ali; Taunton, Sally

    2018-01-01

    Background: Young children from disadvantaged settings often present delays in fundamental motor skills (FMS). Young children can improve their FMS delays through developmentally appropriate motor skill intervention programming. However, it is unclear which pedagogical strategy is most effective for novice and expert instructors. Purpose: The…

  13. Seasons of achievement : the accomplishments of the road weather management program

    DOT National Transportation Integrated Search

    2010-06-25

    Weather is the second largest cause of non recurring congestion, accounting for 25 percent of all non recurring delays. Drivers endure close to one billion lost hours due to delays caused by snow, rain, ice, wind, and fog on an annual basis. Weather ...

  14. Ground-water quality assessment of the central Oklahoma Aquifer, Oklahoma; project description

    USGS Publications Warehouse

    Christenson, S.C.; Parkhurst, D.L.

    1987-01-01

    In April 1986, the U.S. Geological Survey began a pilot program to assess the quality of the Nation's surface-water and ground-water resources. The program, known as the National Water-Quality Assessment (NAWQA) program, is designed to acquire and interpret information about a variety of water-quality issues. The Central Oklahoma aquifer project is one of three ground-water pilot projects that have been started. The NAWQA program also incudes four surface-water pilot projects. The Central Oklahoma aquifer project, as part of the pilot NAWQA program, will develop and test methods for performing assessments of ground-water quality. The objectives of the Central Oklahoma aquifer assessment are: (1) To investigate regional ground-water quality throughout the aquifer in the manner consistent with the other pilot ground-water projects, emphasizing the occurrence and distribution of potentially toxic substances in ground water, including trace elements, organic compounds, and radioactive constituents; (2) to describe relations between ground-water quality, land use, hydrogeology, and other pertinent factors; and (3) to provide a general description of the location, nature, and possible causes of selected prevalent water-quality problems within the study unit; and (4) to describe the potential for water-quality degradation of ground-water zones within the study unit. The Central Oklahoma aquifer, which includes in descending order the Garber Sandstone and Wellington Formation, the Chase Group, the Council Grove Group, the Admire Group, and overlying alluvium and terrace deposits, underlies about 3,000 square miles of central Oklahoma and is used extensively for municipal, industrial, commercial, and domestic water supplies. The aquifer was selected for study by the NAWQA program because it is a major source for water supplies in central Oklahoma and because it has several known or suspected water-quality problems. Known problems include concentrations of arsenic, chromium, selenium, and gross-alpha activity that exceed drinking-water standards. Suspected problems include possible contamination of the aquifer by oil-field brines and drilling fluids, pesticides, industrial chemicals, septic-tank effluent, fertilizers, and leakage from sewage systems and underground tanks used for storage of hydrocarbons. There are four major components of the Central Oklahoma aquifer project. The first component is the collection and analysis of existing information, including chemical, hydrologic, and land-use data. The second component is the geohydrologic and geochemical investigations of the aquifer flow system. The third component is the sampling for a wide variety of inorganic, organic, and radioactive constituents as part a regional survey that will produce a consistent set of data among all ground-water pilot projects. These data can be used to: (1) Define regional ground-water quality within the Central Oklahoma aquifer, and (2) compare water quality in the Central Oklahoma aquifer to the water quality in the other ground-water study units of the NAWQA program. The fourth component is topical studies that will address, in more detail, some of the major water-quality issues pertaining to the aquifer.

  15. Ground-Water Availability in the United States

    USGS Publications Warehouse

    Reilly, Thomas E.; Dennehy, Kevin F.; Alley, William M.; Cunningham, William L.

    2008-01-01

    Ground water is among the Nation's most important natural resources. It provides half our drinking water and is essential to the vitality of agriculture and industry, as well as to the health of rivers, wetlands, and estuaries throughout the country. Large-scale development of ground-water resources with accompanying declines in ground-water levels and other effects of pumping has led to concerns about the future availability of ground water to meet domestic, agricultural, industrial, and environmental needs. The challenges in determining ground-water availability are many. This report examines what is known about the Nation's ground-water availability and outlines a program of study by the U.S. Geological Survey Ground-Water Resources Program to improve our understanding of ground-water availability in major aquifers across the Nation. The approach is designed to provide useful regional information for State and local agencies who manage ground-water resources, while providing the building blocks for a national assessment. The report is written for a wide audience interested or involved in the management, protection, and sustainable use of the Nation's water resources.

  16. Electrical Grounding Architecture for Unmanned Spacecraft

    NASA Technical Reports Server (NTRS)

    1998-01-01

    This handbook is approved for use by NASA Headquarters and all NASA Centers and is intended to provide a common framework for consistent practices across NASA programs. This handbook was developed to describe electrical grounding design architecture options for unmanned spacecraft. This handbook is written for spacecraft system engineers, power engineers, and electromagnetic compatibility (EMC) engineers. Spacecraft grounding architecture is a system-level decision which must be established at the earliest point in spacecraft design. All other grounding design must be coordinated with and be consistent with the system-level architecture. This handbook assumes that there is no one single 'correct' design for spacecraft grounding architecture. There have been many successful satellite and spacecraft programs from NASA, using a variety of grounding architectures with different levels of complexity. However, some design principles learned over the years apply to all types of spacecraft development. This handbook summarizes those principles to help guide spacecraft grounding architecture design for NASA and others.

  17. Use of computer programs STLK1 and STWT1 for analysis of stream-aquifer hydraulic interaction

    USGS Publications Warehouse

    Desimone, Leslie A.; Barlow, Paul M.

    1999-01-01

    Quantifying the hydraulic interaction of aquifers and streams is important in the analysis of stream base fow, flood-wave effects, and contaminant transport between surface- and ground-water systems. This report describes the use of two computer programs, STLK1 and STWT1, to analyze the hydraulic interaction of streams with confined, leaky, and water-table aquifers during periods of stream-stage fuctuations and uniform, areal recharge. The computer programs are based on analytical solutions to the ground-water-flow equation in stream-aquifer settings and calculate ground-water levels, seepage rates across the stream-aquifer boundary, and bank storage that result from arbitrarily varying stream stage or recharge. Analysis of idealized, hypothetical stream-aquifer systems is used to show how aquifer type, aquifer boundaries, and aquifer and streambank hydraulic properties affect aquifer response to stresses. Published data from alluvial and stratifed-drift aquifers in Kentucky, Massachusetts, and Iowa are used to demonstrate application of the programs to field settings. Analytical models of these three stream-aquifer systems are developed on the basis of available hydrogeologic information. Stream-stage fluctuations and recharge are applied to the systems as hydraulic stresses. The models are calibrated by matching ground-water levels calculated with computer program STLK1 or STWT1 to measured ground-water levels. The analytical models are used to estimate hydraulic properties of the aquifer, aquitard, and streambank; to evaluate hydrologic conditions in the aquifer; and to estimate seepage rates and bank-storage volumes resulting from flood waves and recharge. Analysis of field examples demonstrates the accuracy and limitations of the analytical solutions and programs when applied to actual ground-water systems and the potential uses of the analytical methods as alternatives to numerical modeling for quantifying stream-aquifer interactions.

  18. Analytical solutions for one-, two-, and three-dimensional solute transport in ground-water systems with uniform flow

    USGS Publications Warehouse

    Wexler, Eliezer J.

    1992-01-01

    Analytical solutions to the advective-dispersive solute-transport equation are useful in predicting the fate of solutes in ground water. Analytical solutions compiled from available literature or derived by the author are presented for a variety of boundary condition types and solute-source configurations in one-, two-, and three-dimensional systems having uniform ground-water flow. A set of user-oriented computer programs was created to evaluate these solutions and to display the results in tabular and computer-graphics format. These programs incorporate many features that enhance their accuracy, ease of use, and versatility. Documentation for the programs describes their operation and required input data, and presents the results of sample problems. Derivations of selected solutions, source codes for the computer programs, and samples of program input and output also are included.

  19. Software for Simulating Air Traffic

    NASA Technical Reports Server (NTRS)

    Sridhar, Banavar; Bilimoria, Karl; Grabbe, Shon; Chatterji, Gano; Sheth, Kapil; Mulfinger, Daniel

    2006-01-01

    Future Air Traffic Management Concepts Evaluation Tool (FACET) is a system of software for performing computational simulations for evaluating advanced concepts of advanced air-traffic management. FACET includes a program that generates a graphical user interface plus programs and databases that implement computational models of weather, airspace, airports, navigation aids, aircraft performance, and aircraft trajectories. Examples of concepts studied by use of FACET include aircraft self-separation for free flight; prediction of air-traffic-controller workload; decision support for direct routing; integration of spacecraft-launch operations into the U.S. national airspace system; and traffic- flow-management using rerouting, metering, and ground delays. Aircraft can be modeled as flying along either flight-plan routes or great-circle routes as they climb, cruise, and descend according to their individual performance models. The FACET software is modular and is written in the Java and C programming languages. The architecture of FACET strikes a balance between flexibility and fidelity; as a consequence, FACET can be used to model systemwide airspace operations over the contiguous U.S., involving as many as 10,000 aircraft, all on a single desktop or laptop computer running any of a variety of operating systems. Two notable applications of FACET include: (1) reroute conformance monitoring algorithms that have been implemented in one of the Federal Aviation Administration s nationally deployed, real-time, operational systems; and (2) the licensing and integration of FACET with the commercially available Flight Explorer, which is an Internet- based, real-time flight-tracking system.

  20. MILITARY PAY: Processes for Retaining Injured Army National Guard and Reserve Soldiers on Active Duty Have Been Improved, but Some Challenges Remain

    DTIC Science & Technology

    2007-05-01

    Active Duty Have Been Improved, but Some Challenges Remain The Army’s MRP program has largely resolved the widespread delays in order processing that...interviewed confirmed that they did not experience gaps in pay and associated benefits because of order processing delays. However, some of the...and injured reserve component soldiers we interviewed, these improvements have virtually eliminated the widespread delays in order processing that

  1. Characterization and predictors of first and subsequent inappropriate ICD therapy by heart rate ranges: Result of the MADIT-RIT efficacy analysis.

    PubMed

    Kutyifa, Valentina; Daubert, James P; Olshansky, Brian; Huang, David T; Zhang, Claire; Ruwald, Anne-Christine H; McNitt, Scott; Zareba, Wojciech; Moss, Arthur J; Schuger, Claudio

    2015-09-01

    Data on inappropriate implantable cardioverter-defibrillator (ICD) therapy and effects of programming by heart rate are lacking. We aimed to characterize inappropriate ICD therapy and assess the effects of novel programming by heart rate. Incidence and causes of inappropriate therapy by heart rate range (below or above 200 bpm) were assessed. Predictors of inappropriate therapy and effects of programming by heart rate were evaluated with multivariate Cox regression models. Crossovers were excluded. Inappropriate therapy occurred in 9.2% of the total patient population, with 19% of patients randomized to study arm A, 3.6% in arm B, and 4.7% in arm C. Inappropriate therapies <200 bpm were attributable to supraventricular tachycardia (SVT)/sinus tachycardia (78%) or atrial fibrillation/flutter (20%). Inappropriate therapy ≥200 bpm occurred because of SVT (47%), atrial fibrillation/flutter (41%), or electromagnetic interference (13%). Conventional ICD programming was associated with more inappropriate therapy <200 bpm than high-rate or delayed therapy, as were younger age, history of atrial arrhythmia, advanced New York Heart Association functional class, ICD versus cardiac resynchronization therapy with defibrillator, and absence of diabetes. High-rate and long-delay therapy significantly reduced the risk of inappropriate therapy in the <200 bpm range. Long delay was associated with further reduction of fast (≥200 bpm) inappropriate therapy (P = .032) and a reduction in subsequent inappropriate episodes (P = .006). In MADIT-RIT, inappropriate ICD therapy is most frequent at rates below 200 bpm and can be predicted, and effectively prevented, with high-rate cutoff programming. Long-delay therapy effectively reduces fast inappropriate therapy ≥200 bpm and subsequent events. [ http://clinicaltrials.gov/ct2/show/NCT00947310]. Copyright © 2015 Heart Rhythm Society. Published by Elsevier Inc. All rights reserved.

  2. A finite-element model for simulation of two-dimensional steady-state ground-water flow in confined aquifers

    USGS Publications Warehouse

    Kuniansky, E.L.

    1990-01-01

    A computer program based on the Galerkin finite-element method was developed to simulate two-dimensional steady-state ground-water flow in either isotropic or anisotropic confined aquifers. The program may also be used for unconfined aquifers of constant saturated thickness. Constant head, constant flux, and head-dependent flux boundary conditions can be specified in order to approximate a variety of natural conditions, such as a river or lake boundary, and pumping well. The computer program was developed for the preliminary simulation of ground-water flow in the Edwards-Trinity Regional aquifer system as part of the Regional Aquifer-Systems Analysis Program. Results of the program compare well to analytical solutions and simulations .from published finite-difference models. A concise discussion of the Galerkin method is presented along with a description of the program. Provided in the Supplemental Data section are a listing of the computer program, definitions of selected program variables, and several examples of data input and output used in verifying the accuracy of the program.

  3. 77 FR 13971 - Regulated Navigation Area; MBTA Saugus River Railroad Drawbridge Rehabilitation Project, Saugus...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-08

    .... Wright, Program Manager, Docket Operations, telephone 202-366-9826. SUPPLEMENTARY INFORMATION: Public... MBTA has instituted single track operation, a reduction of speed, and prohibited braking on the bridge... the bridge. The delay of necessary repair operations would result in increased costs, delay the date...

  4. An Evaluation of Nutrition Education Program for Low-Income Youth

    ERIC Educational Resources Information Center

    Kemirembe, Olive M. K.; Radhakrishna, Rama B.; Gurgevich, Elise; Yoder, Edgar P.; Ingram, Patreese D.

    2011-01-01

    A quasi-experimental design consisting of pretest, posttest, and delayed posttest comparison control group was used. Nutrition knowledge and behaviors were measured at pretest (time 1) posttest (time 2) and delayed posttest (time 3). General Linear Model (GLM) repeated measure ANCOVA results showed that youth who received nutrition education…

  5. In Infants' Hands: Identification of Preverbal Infants at Risk for Primary Language Delay

    ERIC Educational Resources Information Center

    Lüke, Carina; Grimminger, Angela; Rohlfing, Katharina J.; Liszkowski, Ulf; Ritterfeld, Ute

    2017-01-01

    Early identification of primary language delay is crucial to implement effective prevention programs. Available screening instruments are based on parents' reports and have only insufficient predictive validity. This study employed observational measures of preverbal infants' gestural communication to test its predictive validity for identifying…

  6. Teaching Ecologically-Based Communication Skills to Persons Who Are Developmentally Delayed.

    ERIC Educational Resources Information Center

    Sousie, Susan P.

    The paper offers a framework for the design, implementation, and evaluation of appropriate, effective communication instructional programs for persons who are severely developmentally delayed. The use of an ecological approach that incorporates the instruction of communication skills with that of activities of daily living (ADL) is emphasized.…

  7. Airborne Trajectory Management (ABTM): A Blueprint for Greater Autonomy in Air Traffic Management

    NASA Technical Reports Server (NTRS)

    Cotton, William B.; Wing, David

    2017-01-01

    The aviation users of the National Airspace System (NAS) - the airlines, General Aviation (GA), the military and, most recently, operators of Unmanned Aircraft Systems (UAS) - are constrained in their operations by the design of the current paradigm for air traffic control (ATC). Some of these constraints include ATC preferred routes, departure fix restrictions and airspace ground delay programs. As a result, most flights cannot operate on their most efficient business trajectories and a great many flights are delayed even getting into the air, which imposes a significant challenge to maintaining efficient flight and network operations. Rather than accepting ever more sophisticated scheduling solutions to accommodate the existing constraints in the airspace, a series of increasingly capable airborne technologies, integrated with planned improvements in the ground system through the Federal Aviation Administration (FAA) Next Generation Air Traffic Management System (NextGen) programs, could produce much greater operational flexibility for flight path optimization by the aviation system users. These capabilities, described in research coming out of NASA's Aeronautics Research Mission Directorate, can maintain or improve operational safety while taking advantage of air and ground NextGen technologies in novel ways. The underlying premise is that the nation's physical airspace is still abundant and underused, and that the delays and inefficient flight operations resulting from artificial structure in airspace use and procedural constraints on those operations may not be necessary for safe and efficient flight. This article is not an indictment of today's NAS or the people who run it. Indeed, it is an exceptional achievement that Air Traffic Management (ATM) - the complex human/machine conglomeration of communications, navigation and surveillance equipment and the rules and procedures for controlling traffic in the airspace - has both the capacity and enables the degree of efficiency in air travel that it does. But it is also true that sixty years of the "radar religion" (i.e., reliance on radar-based command and control) has produced several generations of ATM system operators and researchers who believe that introducing automation within the existing functional structure of ATM is the only way to "modernize" the system. Even NextGen, which began as a proposal for "transformational" change in the way ATC is performed, has morphed over the last decade and a half to become just the inclusion of Global Positioning System (GPS) for navigation, Automatic Dependent Surveillance Broadcast (ADS-B) for surveillance, and Data Communications (Data Comm) for communications, while still operating in rigidly structured airspace with human controllers being responsible for separation and traffic flow management (TFM) within defined sectors of airspace, using the same horizontal separation standards that have been in use since raw primary radar was introduced in the 1950s. No system as massive as the current NAS ATM can be replaced with a better system while simultaneously meeting the transportation and other aviation needs of the nation. A new generation of more flexible operations must emerge and yet coexist in harmony with the current operation (i.e., share the same airspace without segregation), thereby enabling a long-term transformation to take place in the way increasing numbers of flights are handled. Market forces will be the ultimate driver of this transformation, and investment realities mandate that real benefits must accrue to the first operators to adopt these new capabilities. In fact, the kinds of missions envisioned in the emerging world of UAS operations, unachievable under conventional ATM, demand that this transformation take place. Airborne Trajectory Management (ABTM) is proposed as a series of transformational steps leading to vastly increased flexibility in flight operations and capacity in the airspace to accommodate many varied airspace uses while improving safety. As will be described, ABTM enables the gradual emergence of a new paradigm for user-based trajectory management in ATM that brings tangible benefits to equipped operators at every step while leveraging the air and ground investments of NextGen. There are five steps in this ABTM transformation.1 NASA has extensively studied the first and last of these steps, and a roadmap of increasing capabilities and benefits is proposed for bridging between these operational concepts.

  8. 40 CFR 257.24 - Detection monitoring program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Disposal Units Ground-Water Monitoring and Corrective Action § 257.24 Detection monitoring program. (a... unit; (ii) The mobility, stability, and persistence of waste constituents or their reaction products in... constituents, and reaction products in the ground water; and (iv) The concentration or values and coefficients...

  9. Progress report on the Worldwide Earthquake Risk Management (WWERM) Program

    USGS Publications Warehouse

    Algermissen, S.T.; Hays, Walter W.; Krumpe, Paul R.

    1992-01-01

    Considerable progress has been made in the Worldwide Earthquake Risk Management (WWERM) Program since its initiation in late 1989 as a cooperative program of the Agency for International Development (AID), Office of U.S. Foreign Disaster Assistance (OFDA), and the U.S. Geological Survey. Probabilistic peak acceleration and peak Modified Mercalli intensity (MMI) maps have been prepared for Chile and for Sulawesi province in Indonesia. Earthquake risk (loss) studies for dwellings in Gorontalo, North Sulawesi, have been completed and risk studies for dwellings in selected areas of central Chile are underway. A special study of the effect of site response on earthquake ground motion estimation in central Chile has also been completed and indicates that site response may modify the ground shaking by as much as plus or minus two units of MMI. A program for the development of national probabilistic ground motion maps for the Philippines is now underway and pilot studies of earthquake ground motion and risk are being planned for Morocco.

  10. Microwave fiber optics delay line

    NASA Astrophysics Data System (ADS)

    Slayman, C.; Yen, H. W.

    1980-01-01

    A microwave delay line is one of the devices used in EW systems for preserving the frequency and phase contents of RF signals. For such applications, delay lines are required to have large dynamic range, wide bandwidth, low insertion loss, and a linear response. The basic components of a fiber-optics delay line are: an optical source, a wideband optical modulator, a spool of single-mode fiber with appropriate length to provide a given microwave signal delay, and a high-speed photodetector with an RF amplifier. This contract program is to study the feasibility of such a fiber-optic delay line in the frequency range of 4.0 to 6.5 GHz. The modulation scheme studied is the direct modulation of injection lasers. The most important issue identified is the frequency response of the injection laser and the photodetector.

  11. The DARWIN breadboard cryogenic optical delay line

    NASA Astrophysics Data System (ADS)

    van den Dool, T. C.; Gielesen, W.; Kamphues, F.; Loix, N.; Kooijman, P. P.; de Vries, C.; van Weers, H.; Fleury, K.; Stockman, Y.; Velsink, G.; Benoit, J.; Poupinet, A.; Sève, F.

    2017-11-01

    TNO, in cooperation with Micromega-Dynamics, SRON, Dutch Space and CSL, has designed a compact breadboard cryogenic delay line (figure 1) for use in future space interferometry missions. The work is performed under ESA contract 17.747/03 in preparation for the DARWIN mission. The breadboard (BB) delay line is representative of a flight mechanism. The delay line has a single stage voice coil actuator for Optical Path Difference (OPD) control, driving a twomirror cat's eye. Magnetic bearings provide frictionless and wear free operation with zero-hysteresis. The design of the BB delay line has been completed. The development test program, including operation at 100 K has been completed. The verification test programme is currently being carried out and will include functional testing at 40 K.

  12. Facility Systems, Ground Support Systems, and Ground Support Equipment General Design Requirements

    NASA Technical Reports Server (NTRS)

    Thaxton, Eric A.; Mathews, Roger E.

    2014-01-01

    This standard establishes requirements and guidance for design and fabrication of ground systems (GS) that includes: ground support equipment (GSE), ground support systems (GSS), and facility ground support systems (F GSS) to provide uniform methods and processes for design and development of robust, safe, reliable, maintainable, supportable, and cost-effective GS in support of space flight and institutional programs and projects.

  13. Grounding Teacher Education in Practice around the World: An Examination of Teacher Education Coursework in Teacher Education Programs in Finland, Norway, and the United States

    ERIC Educational Resources Information Center

    Jenset, Inga Staal; Klette, Kirsti; Hammerness, Karen

    2018-01-01

    Worldwide, teacher educators and policy makers have called for teacher preparation that is more deeply linked to practice. Yet we know little about how such linkages are achieved within different international programs. We examine the degree to which programs provide opportunities to learn that are grounded in practice, during university…

  14. The Examination of the Effects of Functional Training Program Applied on Instable Ground on Anaerobic Capacities of Elite Martial Arts Athletes

    ERIC Educational Resources Information Center

    Caglayan, Atakan; Ozbar, Nurper

    2017-01-01

    The aim of this study is to measure both dynamic balance of elite martial arts athletes doing functional strength exercises on instable ground and the effects of circuit training program on their anaerobic capacities, and compare them with those following classical training program. Students studying in Faculty of Sport Sciences at Duzce…

  15. 33 CFR 162.235 - Puget Sound Area, Wash.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... sound this signal at least 500 feet south from the end of the jetties in Oak bay. If no other boat... within the canal grounds unless they are well over on the tide flats to the west of the dredged channel... the canal with a towline more than 200 feet in length. (7) Delaying traffic. No person shall cause or...

  16. Processing Satellite Data for Slant Total Electron Content Measurements

    NASA Technical Reports Server (NTRS)

    Stephens, Philip John (Inventor); Komjathy, Attila (Inventor); Wilson, Brian D. (Inventor); Mannucci, Anthony J. (Inventor)

    2016-01-01

    A method, system, and apparatus provide the ability to estimate ionospheric observables using space-borne observations. Space-borne global positioning system (GPS) data of ionospheric delay are obtained from a satellite. The space-borne GPS data are combined with ground-based GPS observations. The combination is utilized in a model to estimate a global three-dimensional (3D) electron density field.

  17. Performance Analysis of AeroRP with Ground Station Advertisements

    DTIC Science & Technology

    2012-03-12

    results showed that AeroRP outperforms the traditional MANET routing protocols in terms of throughput and packet delivery ra - tio (PDR) [5, 6]. AeroRP...and waiting for the source to re- send the packet increases the end-to-end delay. The AeroNP corruption indicator and HEC -CRC (header error check...Dev ID | NP HEC CRC-16 | +-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+-+ \\ \\ / AeroTP Payload

  18. Aircraft Maintenance Experience Design Handbook

    DTIC Science & Technology

    1978-09-11

    RlOM A JOB P iiLPAhATIL)N MINOR MAINTFNANCF DELAYS • ACCESS SF Fit L ING OUr FORMS FAL ISLAI11N ’ FAULT COIRNNCTION M4N[. FANCE 6 AOJUSIMUNT CALIBRATION...Washington , D).(. Auglsit. 19t4. "A*SC Dh 1-9, Maintainability (for Ground Electronics Syste.ms)", A1LS L _sigil handbook. Series -- 0. Gene •ai

  19. Use of a ground-water flow model with particle tracking to evaluate ground-water vulnerability, Clark County, Washington

    USGS Publications Warehouse

    Snyder, D.T.; Wilkinson, J.M.; Orzol, L.L.

    1996-01-01

    A ground-water flow model was used in conjunction with particle tracking to evaluate ground-water vulnerability in Clark County, Washington. Using the particle-tracking program, particles were placed in every cell of the flow model (about 60,000 particles) and tracked backwards in time and space upgradient along flow paths to their recharge points. A new computer program was developed that interfaces the results from a particle-tracking program with a geographic information system (GIS). The GIS was used to display and analyze the particle-tracking results. Ground-water vulnerability was evaluated by selecting parts of the ground-water flow system and combining the results with ancillary information stored in the GIS to determine recharge areas, characteristics of recharge areas, downgradient impact of land use at recharge areas, and age of ground water. Maps of the recharge areas for each hydrogeologic unit illustrate the presence of local, intermediate, or regional ground-water flow systems and emphasize the three-dimensional nature of the ground-water flow system in Clark County. Maps of the recharge points for each hydrogeologic unit were overlaid with maps depicting aquifer sensitivity as determined by DRASTIC (a measure of the pollution potential of ground water, based on the intrinsic characteristics of the near-surface unsaturated and saturated zones) and recharge from on-site waste-disposal systems. A large number of recharge areas were identified, particularly in southern Clark County, that have a high aquifer sensitivity, coincide with areas of recharge from on-site waste-disposal systems, or both. Using the GIS, the characteristics of the recharge areas were related to the downgradient parts of the ground-water system that will eventually receive flow that has recharged through these areas. The aquifer sensitivity, as indicated by DRASTIC, of the recharge areas for downgradient parts of the flow system was mapped for each hydrogeologic unit. A number of public-supply wells in Clark County may be receiving a component of water that recharged in areas that are more conducive to contaminant entry. The aquifer sensitivity maps illustrate a critical deficiency in the DRASTIC methodology: the failure to account for the dynamics of the ground-water flow system. DRASTIC indices calculated for a particular location thus do not necessarily reflect the conditions of the ground-water resources at the recharge areas to that particular location. Each hydrogeologic unit was also mapped to highlight those areas that will eventually receive flow from recharge areas with on-site waste-disposal systems. Most public-supply wells in southern Clark County may eventually receive a component of water that was recharged from on-site waste-disposal systems.Traveltimes from particle tracking were used to estimate the minimum and maximum age of ground water within each model-grid cell. Chlorofluorocarbon (CFC)-age dating of ground water from 51 wells was used to calibrate effective porosity values used for the particle- tracking program by comparison of ground-water ages determined through the use of the CFC-age dating with those calculated by the particle- tracking program. There was a 76 percent agreement in predicting the presence of modern water in the 51 wells as determined using CFCs and calculated by the particle-tracking program. Maps showing the age of ground water were prepared for all the hydrogeologic units. Areas with the youngest ground-water ages are expected to be at greatest risk for contamination from anthropogenic sources. Comparison of these maps with maps of public- supply wells in Clark County indicates that most of these wells may withdraw ground water that is, in part, less than 100 years old, and in many instances less than 10 years old. Results of the analysis showed that a single particle-tracking analysis simulating advective transport can be used to evaluate ground-water vulnerability for any part of a ground-wate

  20. Malaria infection and feather growth rate predict reproductive success in house martins.

    PubMed

    Marzal, Alfonso; Reviriego, Maribel; Hermosell, Ignacio G; Balbontín, Javier; Bensch, Staffan; Relinque, Carmen; Rodríguez, Laura; Garcia-Longoria, Luz; de Lope, Florentino

    2013-04-01

    Carry-over effects take place when events occurring in one season influence individual performance in a subsequent season. Blood parasites (e.g. Plasmodium and Haemoproteus) have strong negative effects on the body condition of their hosts and could slow the rate of feather growth on the wintering grounds. In turn, these winter moult costs could reduce reproductive success in the following breeding season. In house martins Delichon urbica captured and studied at a breeding site in Europe, we used ptilochronology to measure growth rate of tail feathers moulted on the winter range in Africa, and assessed infection status of blood parasites transmitted on the wintering grounds. We found a negative association between haemosporidian parasite infection status and inferred growth rate of tail feathers. A low feather growth rate and blood parasite infections were related to a delay in laying date in their European breeding quarters. In addition, clutch size and the number of fledglings were negatively related to a delayed laying date and blood parasite infection. These results stress the importance of blood parasites and feather growth rate as potentially mechanisms driving carry-over effects to explain fitness differences in wild populations of migratory birds.

  1. A computer program for calculating relative-transmissivity input arrays to aid model calibration

    USGS Publications Warehouse

    Weiss, Emanuel

    1982-01-01

    A program is documented that calculates a transmissivity distribution for input to a digital ground-water flow model. Factors that are taken into account in the calculation are: aquifer thickness, ground-water viscosity and its dependence on temperature and dissolved solids, and permeability and its dependence on overburden pressure. Other factors affecting ground-water flow are indicated. With small changes in the program code, leakance also could be calculated. The purpose of these calculations is to provide a physical basis for efficient calibration, and to extend rational transmissivity trends into areas where model calibration is insensitive to transmissivity values.

  2. GROUND WATER SAMPLING ISSUES

    EPA Science Inventory

    Obtaining representative ground water samples is important for site assessment and
    remedial performance monitoring objectives. Issues which must be considered prior to initiating a ground-water monitoring program include defining monitoring goals and objectives, sampling point...

  3. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Adrian Municipal Well Field site is in Adrian, Nobles County, Minnesota, a city which relies solely on ground water for its municipal water supply. In 1983 the State detected VOC contamination in two of the six wells at the site, and by 1985 the city had replaced the VOC-contaminated wells with two new wells. Subsequent ground water sampling indicated that petroleum releases from underground storage tanks (UST) are sources for soil and ground water contamination. Although ground water contaminant concentrations exceed Federal and State drinking water and surface water standards, no further action will be taken by the Superfundmore » program because the program does not have the authority to address clean up of petroleum releases. EPA will, however, formally transfer the site to its UST program in October 1989 for further action. There are no costs associated with this remedial action.« less

  4. 75 FR 68702 - Regulation SHO

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-09

    ... extended compliance period will give industry participants additional time for programming and testing for... time for programming and testing for compliance with the Rule's requirements. We have been informed that there have been some delays in the programming process, due in part to certain information, which...

  5. Computer Programs for Library Operations; Results of a Survey Conducted Between Fall 1971 and Spring 1972.

    ERIC Educational Resources Information Center

    Liberman, Eva; And Others

    Many library operations involving large data banks lend themselves readily to computer operation. In setting up library computer programs, in changing or expanding programs, cost in programming and time delays could be substantially reduced if the programmers had access to library computer programs being used by other libraries, providing similar…

  6. Tug fleet and ground operations schedules and controls. Volume 2: part 1

    NASA Technical Reports Server (NTRS)

    1975-01-01

    This Tug Fleet and Ground Operations Schedules and Controls Study addresses both ground operational data and technical requirements that span the Tug planning phase and operations phase. A similar study covering mission operations (by others) provides the complimentary flight operations details. The two studies provide the planning data requirements, resource allocation, and control milestones for supporting the requirements of the STS program. This Tug Fleet and Ground Operations Schedules and Controls Study incorporates the basic ground operations requirements and concepts provided by previous studies with the interrelationships of the planning, IUS transition, and Tug fleet operations phases. The interrelationships of these phases were studied as a system to optimize overall program benefits and minimize operational risk factors.

  7. Hypobaric Hypoxia Exacerbates the Neuroinflammatory Response to Traumatic Brain Injury

    PubMed Central

    Goodman, Michael D.; Makley, Amy T.; Huber, Nathan L.; Clarke, Callisia N.; Friend, Lou Ann W.; Schuster, Rebecca M.; Bailey, Stephanie R.; Barnes, Stephen L.; Dorlac, Warren C.; Johannigman, Jay A.; Lentsch, Alex B.; Pritts, Timothy A.

    2015-01-01

    Objective To determine the inflammatory effects of time-dependent exposure to the hypobaric environment of simulated aeromedical evacuation following traumatic brain injury (TBI). Methods Mice were subjected to a blunt TBI or sham injury. Righting reflex response (RRR) time was assessed as an indicator of neurologic recovery. Three or 24 h (Early and Delayed groups, respectively) after TBI, mice were exposed to hypobaric flight conditions (Fly) or ground-level control (No Fly) for 5 h. Arterial blood gas samples were obtained from all groups during simulated flight. Serum and cortical brain samples were analyzed for inflammatory cytokines after flight. Neuron specific enolase (NSE) was measured as a serum biomarker of TBI severity. Results TBI resulted in prolonged RRR time compared with sham injury. After TBI alone, serum levels of interleukin-6 (IL-6) and keratinocyte-derived chemokine (KC) were increased by 6 h post-injury. Simulated flight significantly reduced arterial oxygen saturation levels in the Fly group. Post-injury altitude exposure increased cerebral levels of IL-6 and macrophage inflammatory protein-1α (MIP-1α), as well as serum NSE in the Early but not Delayed Flight group compared to ground-level controls. Conclusions The hypobaric environment of aero-medical evacuation results in significant hypoxia. Early, but not delayed, exposure to a hypobaric environment following TBI increases the neuroinflammatory response to injury and the severity of secondary brain injury. Optimization of the post-injury time to fly using serum cytokine and biomarker levels may reduce the potential secondary cerebral injury induced by aeromedical evacuation. PMID:20850781

  8. Improving the performance of interferometric imaging through the use of disturbance feedforward.

    PubMed

    Böhm, Michael; Glück, Martin; Keck, Alexander; Pott, Jörg-Uwe; Sawodny, Oliver

    2017-05-01

    In this paper, we present a disturbance compensation technique to improve the performance of interferometric imaging for extremely large ground-based telescopes, e.g., the Large Binocular Telescope (LBT), which serves as the application example in this contribution. The most significant disturbance sources at ground-based telescopes are wind-induced mechanical vibrations in the range of 8-60 Hz. Traditionally, their optical effect is eliminated by feedback systems, such as the adaptive optics control loop combined with a fringe tracking system within the interferometric instrument. In this paper, accelerometers are used to measure the vibrations. These measurements are used to estimate the motion of the mirrors, i.e., tip, tilt and piston, with a dynamic estimator. Additional delay compensation methods are presented to cancel sensor network delays and actuator input delays, improving the estimation result even more, particularly at higher frequencies. Because various instruments benefit from the implementation of telescope vibration mitigation, the estimator is implemented as a separate, independent software on the telescope, publishing the estimated values via multicast on the telescope's ethernet. Every client capable of using and correcting the estimated disturbances can subscribe and use these values in a feedforward for its compensation device, e.g., the deformable mirror, the piston mirror of LINC-NIRVANA, or the fast path length corrector of the Large Binocular Telescope Interferometer. This easy-to-use approach eventually leveraged the presented technology for interferometric use at the LBT and now significantly improves the sky coverage, performance, and operational robustness of interferometric imaging on a regular basis.

  9. A modification of the finite-difference model for simulation of two dimensional ground-water flow to include surface-ground water relationships

    USGS Publications Warehouse

    Ozbilgin, M.M.; Dickerman, D.C.

    1984-01-01

    The two-dimensional finite-difference model for simulation of groundwater flow was modified to enable simulation of surface-water/groundwater interactions during periods of low streamflow. Changes were made to the program code in order to calculate surface-water heads for, and flow either to or from, contiguous surface-water bodies; and to allow for more convenient data input. Methods of data input and output were modified and entries (RSORT and HDRIVER) were added to the COEF and CHECKI subroutines to calculate surface-water heads. A new subroutine CALC was added to the program which initiates surface-water calculations. If CALC is not specified as a simulation option, the program runs the original version. The subroutines which solve the ground-water flow equations were not changed. Recharge, evapotranspiration, surface-water inflow, number of wells, pumping rate, and pumping duration can be varied for any time period. The Manning formula was used to relate stream depth and discharge in surface-water streams. Interactions between surface water and ground water are represented by the leakage term in the ground-water flow and surface-water mass balance equations. Documentation includes a flow chart, data deck instructions, input data, output summary, and program listing. Numerical results from the modified program are in good agreement with published analytical results. (USGS)

  10. Ground-Based Research within NASA's Materials Science Program

    NASA Technical Reports Server (NTRS)

    Gillies, Donald C.; Curreri, Peter (Technical Monitor)

    2002-01-01

    Ground-based research in Materials Science for NASA's Microgravity program serves several purposes, and includes approximately four Principal Investigators for every one in the flight program. While exact classification is difficult. the ground program falls roughly into the following categories: (1) Intellectual Underpinning of the Flight Program - Theoretical Studies; (2) Intellectual Underpinning of the Flight Program - Bringing to Maturity New Research; (3) Intellectual Underpinning of the Flight Program - Enabling Characterization; (4) Intellectual Underpinning of the Flight Program - Thermophysical Property Determination; (5) Radiation Shielding; (6) Preliminary In Situ Resource Utilization; (7) Biomaterials; (8) Nanostructured Materials; (9) Materials Science for Advanced Space Propulsion. It must be noted that while the first four categories are aimed at using long duration low gravity conditions, the other categories pertain more to more recent NASA initiatives in materials science. These new initiatives address NASA's future materials science needs in the realms of crew health and safety, and exploration, and have been included in the most recent NASA Research Announcements (NRA). A description of each of these nine categories will be given together with examples of the kinds of research being undertaken.

  11. On the Pontryagin maximum principle for systems with delays. Economic applications

    NASA Astrophysics Data System (ADS)

    Kim, A. V.; Kormyshev, V. M.; Kwon, O. B.; Mukhametshin, E. R.

    2017-11-01

    The Pontryagin maximum principle [6] is the key stone of finite-dimensional optimal control theory [1, 2, 5]. So beginning with opening the maximum principle it was important to extend the maximum principle on various classes of dynamical systems. In t he paper we consider some aspects of application of i-smooth analysis [3, 4] in the theory of the Pontryagin maximum principle [6] for systems with delays, obtained results can be applied by elaborating optimal program controls in economic models with delays.

  12. Quarry blasts assessment and their environmental impacts on the nearby oil pipelines, southeast of Helwan City, Egypt

    NASA Astrophysics Data System (ADS)

    Mohamed, Adel M. E.; Mohamed, Abuo El-Ela A.

    2013-06-01

    Ground vibrations induced by blasting in the cement quarries are one of the fundamental problems in the quarrying industry and may cause severe damage to the nearby utilities and pipelines. Therefore, a vibration control study plays an important role in the minimization of environmental effects of blasting in quarries. The current paper presents the influence of the quarry blasts at the National Cement Company (NCC) on the two oil pipelines of SUMED Company southeast of Helwan City, by measuring the ground vibrations in terms of Peak Particle Velocity (PPV). The seismic refraction for compressional waves deduced from the shallow seismic survey and the shear wave velocity obtained from the Multi channel Analysis of Surface Waves (MASW) technique are used to evaluate the closest site of the two pipelines to the quarry blasts. The results demonstrate that, the closest site of the two pipelines is of class B, according to the National Earthquake Hazard Reduction Program (NEHRP) classification and the safe distance to avoid any environmental effects is 650 m, following the deduced Peak Particle Velocity (PPV) and scaled distance (SD) relationship (PPV = 700.08 × SD-1.225) in mm/s and the Air over Pressure (air blast) formula (air blast = 170.23 × SD-0.071) in dB. In the light of prediction analysis, the maximum allowable charge weight per delay was found to be 591 kg with damage criterion of 12.5 mm/s at the closest site of the SUMED pipelines.

  13. Autonomous Satellite Operations Via Secure Virtual Mission Operations Center

    NASA Technical Reports Server (NTRS)

    Miller, Eric; Paulsen, Phillip E.; Pasciuto, Michael

    2011-01-01

    The science community is interested in improving their ability to respond to rapidly evolving, transient phenomena via autonomous rapid reconfiguration, which derives from the ability to assemble separate but collaborating sensors and data forecasting systems to meet a broad range of research and application needs. Current satellite systems typically require human intervention to respond to triggers from dissimilar sensor systems. Additionally, satellite ground services often need to be coordinated days or weeks in advance. Finally, the boundaries between the various sensor systems that make up such a Sensor Web are defined by such things as link delay and connectivity, data and error rate asymmetry, data reliability, quality of service provisions, and trust, complicating autonomous operations. Over the past ten years, researchers from the NASA Glenn Research Center (GRC), General Dynamics, Surrey Satellite Technology Limited (SSTL), Cisco, Universal Space Networks (USN), the U.S. Geological Survey (USGS), the Naval Research Laboratory, the DoD Operationally Responsive Space (ORS) Office, and others have worked collaboratively to develop a virtual mission operations capability. Called VMOC (Virtual Mission Operations Center), this new capability allows cross-system queuing of dissimilar mission unique systems through the use of a common security scheme and published application programming interfaces (APIs). Collaborative VMOC demonstrations over the last several years have supported the standardization of spacecraft to ground interfaces needed to reduce costs, maximize space effects to the user, and allow the generation of new tactics, techniques and procedures that lead to responsive space employment.

  14. Delayed clarification: information, clarification and ethical decisions in critical care in Norway.

    PubMed

    Bunch, E H

    2000-12-01

    Following the analysis of about 150 hours of field observation on a critical care unit in Norway a theory was generated to explain the actual ethical decision-making process. This was grounded in the empirical reality of physicians, nurses and family. The core theme in this study was a delayed clarification in assessing the prognosis of accident victims with neurosurgical traumas. The physicians, nurses and family had to wait for the clinical picture to clarify, during which time there was an exchange and emergence of information. Exchanging information, a subprocess to delayed clarification, involved a continuous flow of collecting and dispersing information about the clinical status of the patient. The nurses engaged in two useful strategies: grading information to family when the patient prognosis was poor, and providing grieving strategies for themselves, colleagues and family members. The core variable, delayed clarification has three dimensions: clinical, psychological and ethical. The nurses participated in the decision-making process to discontinue treatment as passive participants, they did not engage in collegial deliberations with the physicians. Ethical dilemmas were end of life questions, resource allocations, and questions of justice and organ transplants.

  15. Effects of cockpit lateral stick characteristics on handling qualities and pilot dynamics

    NASA Technical Reports Server (NTRS)

    Mitchell, David G.; Aponso, Bimal L.; Klyde, David H.

    1992-01-01

    This report presents the results of analysis of cockpit lateral control feel-system studies. Variations in feel-system natural frequency, damping, and command sensing reference (force and position) were investigated, in combination with variations in the aircraft response characteristics. The primary data for the report were obtained from a flight investigation conducted with a variable-stability airplane, with additional information taken from other flight experiments and ground-based simulations for both airplanes and helicopters . The study consisted of analysis of handling qualities ratings and extraction of open-loop, pilot-vehicle describing functions from sum-of-sines tracking data, including, for a limited subset of these data, the development of pilot models. The study confirms the findings of other investigators that the effects on pilot opinion of cockpit feel-system dynamics are not equivalent to a comparable level of added time delay, and until a more comprehensive set of criteria are developed, it is recommended that feel-system dynamics be considered a delay-inducing element in the aircraft response. The best correlation with time-delay requirements was found when the feel-system dynamics were included in the delay measurements, regardless of the command reference. This is a radical departure from past approaches.

  16. Atomic clouds as spectrally selective and tunable delay lines for single photons from quantum dots

    NASA Astrophysics Data System (ADS)

    Wildmann, Johannes S.; Trotta, Rinaldo; Martín-Sánchez, Javier; Zallo, Eugenio; O'Steen, Mark; Schmidt, Oliver G.; Rastelli, Armando

    2015-12-01

    We demonstrate a compact, spectrally selective, and tunable delay line for single photons emitted by quantum dots. This is achieved by fine-tuning the wavelength of the optical transitions of such "artificial atoms" into a spectral window in which a cloud of natural atoms behaves as a slow-light medium. By employing the ground-state fine-structure-split exciton confined in an InGaAs/GaAs quantum dot as a source of single photons at different frequencies and the hyperfine-structure-split D1 transition of Cs-vapors as a tunable delay medium, we achieve a differential delay of up 2.4 ns on a 7.5-cm-long path for photons that are only 60 μ eV (14.5 GHz) apart. To quantitatively explain the experimental data, we develop a theoretical model that accounts for both the inhomogeneous broadening of the quantum-dot emission lines and the Doppler broadening of the atomic lines. The concept we proposed here may be used to implement time-reordering operations aimed at erasing the "which-path" information that deteriorates entangled-photon emission from excitons with finite fine-structure splitting.

  17. Analytical solutions for one-, two-, and three-dimensional solute transport in ground-water systems with uniform flow

    USGS Publications Warehouse

    Wexler, Eliezer J.

    1989-01-01

    Analytical solutions to the advective-dispersive solute-transport equation are useful in predicting the fate of solutes in ground water. Analytical solutions compiled from available literature or derived by the author are presented in this report for a variety of boundary condition types and solute-source configurations in one-, two-, and three-dimensional systems with uniform ground-water flow. A set of user-oriented computer programs was created to evaluate these solutions and to display the results in tabular and computer-graphics format. These programs incorporate many features that enhance their accuracy, ease of use, and versatility. Documentation for the programs describes their operation and required input data, and presents the results of sample problems. Derivations of select solutions, source codes for the computer programs, and samples of program input and output also are included.

  18. Accuracy and Reliability Assessment of CT and MR Perfusion Analysis Software Using a Digital Phantom

    PubMed Central

    Christensen, Soren; Sasaki, Makoto; Østergaard, Leif; Shirato, Hiroki; Ogasawara, Kuniaki; Wintermark, Max; Warach, Steven

    2013-01-01

    Purpose: To design a digital phantom data set for computed tomography (CT) perfusion and perfusion-weighted imaging on the basis of the widely accepted tracer kinetic theory in which the true values of cerebral blood flow (CBF), cerebral blood volume (CBV), mean transit time (MTT), and tracer arrival delay are known and to evaluate the accuracy and reliability of postprocessing programs using this digital phantom. Materials and Methods: A phantom data set was created by generating concentration-time curves reflecting true values for CBF (2.5–87.5 mL/100 g per minute), CBV (1.0–5.0 mL/100 g), MTT (3.4–24 seconds), and tracer delays (0–3.0 seconds). These curves were embedded in human brain images. The data were analyzed by using 13 algorithms each for CT and magnetic resonance (MR), including five commercial vendors and five academic programs. Accuracy was assessed by using the Pearson correlation coefficient (r) for true values. Delay-, MTT-, or CBV-dependent errors and correlations between time to maximum of residue function (Tmax) were also evaluated. Results: In CT, CBV was generally well reproduced (r > 0.9 in 12 algorithms), but not CBF and MTT (r > 0.9 in seven and four algorithms, respectively). In MR, good correlation (r > 0.9) was observed in one-half of commercial programs, while all academic algorithms showed good correlations for all parameters. Most algorithms had delay-dependent errors, especially for commercial software, as well as CBV dependency for CBF or MTT calculation and MTT dependency for CBV calculation. Correlation was good in Tmax except for one algorithm. Conclusion: The digital phantom readily evaluated the accuracy and characteristics of the CT and MR perfusion analysis software. All commercial programs had delay-induced errors and/or insufficient correlations with true values, while academic programs for MR showed good correlations with true values. © RSNA, 2012 Supplemental material: http://radiology.rsna.org/lookup/suppl/doi:10.1148/radiol.12112618/-/DC1 PMID:23220899

  19. Tank-automotive robotics

    NASA Astrophysics Data System (ADS)

    Lane, Gerald R.

    1999-07-01

    To provide an overview of Tank-Automotive Robotics. The briefing will contain program overviews & inter-relationships and technology challenges of TARDEC managed unmanned and robotic ground vehicle programs. Specific emphasis will focus on technology developments/approaches to achieve semi- autonomous operation and inherent chassis mobility features. Programs to be discussed include: DemoIII Experimental Unmanned Vehicle (XUV), Tactical Mobile Robotics (TMR), Intelligent Mobility, Commanders Driver Testbed, Collision Avoidance, International Ground Robotics Competition (ICGRC). Specifically, the paper will discuss unique exterior/outdoor challenges facing the IGRC competing teams and the synergy created between the IGRC and ongoing DoD semi-autonomous Unmanned Ground Vehicle and DoT Intelligent Transportation System programs. Sensor and chassis approaches to meet the IGRC challenges and obstacles will be shown and discussed. Shortfalls in performance to meet the IGRC challenges will be identified.

  20. ADVANCES IN GROUND WATER SAMPLING PROCEDURES

    EPA Science Inventory

    Obtaining representative ground water samples is important for site assessment and remedial performance monitoring objectives. Issues which must be considered prior to initiating a ground-water monitoring program include defining monitoring goals and objectives, sampling point...

  1. Grounds Maintenance Evaluation.

    ERIC Educational Resources Information Center

    Chesapeake Public Schools, VA. Office of Program Evaluation.

    The Grounds Shop of the Chesapeake Public School Division (Virginia) Department of School Plants was evaluated in 1995-96. The goals of the grounds maintenance program are to provide safe and attractive grounds for students, parents, and staff of the school district. The evaluation examined the extent to which these goals are being met by using…

  2. The influence of ground conductivity on the structure of RF radiation from return strokes

    NASA Technical Reports Server (NTRS)

    Levine, D. M.; Gesell, L.

    1984-01-01

    The combination of the finite conductivity of the Earth plus the propagation of the return stroke current up the channel which results in an apparent time delay between the fast field changes and RF radiation for distant observers is shown. The time delay predicted from model return strokes is on the order of 20 micro and the received signal has the characteristics of the data observed in Virginia and Florida. A piecewise linear model for the return stroke channel and a transmission line model for current propagation on each segment was used. Radiation from each segment is calculated over a flat Earth with finite conductivity using asymptotics approximations for the Sommerfeld integrals. The radiation at the observer is processed by a model AM radio receiver. The output voltage was calculated for several frequencies between HF-UHF assuming a system bandwidth (300 kHz) characteristic of the system used to collect data in Florida and Virginia. Comparison with the theoretical fast field changes indicates a time delay of 20 microns.

  3. Hybrid Smith predictor and phase lead based divergence compensation for hardware-in-the-loop contact simulation with measurement delay

    NASA Astrophysics Data System (ADS)

    Qi, Chenkun; Gao, Feng; Zhao, Xianchao; Wang, Qian; Ren, Anye

    2018-06-01

    On the ground the hardware-in-the-loop (HIL) simulation is a good approach to test the contact dynamics of spacecraft docking process in space. Unfortunately, due to the time delay in the system the HIL contact simulation becomes divergent. However, the traditional first-order phase lead compensation approach still result in a small divergence for the pure time delay. The serial Smith predictor and phase lead compensation approach proposed by the authors recently will lead to an over-compensation and an obvious convergence. In this study, a hybrid Smith predictor and phase lead compensation approach is proposed. The hybrid Smith predictor and phase lead compensation can achieve a higher simulation fidelity with a little convergence. The phase angle of the compensator is analyzed and the stability condition of the HIL simulation system is given. The effectiveness of the proposed compensation approach is tested by simulations on an undamped elastic contact process.

  4. COMPILATION OF SATURATED AND UNSATURATED ZONE MODELING SOFTWARE

    EPA Science Inventory

    The full report provides readers an overview of available ground-water modeling programs and related software. It is an update of EPA/600/R-93/118 and EPA/600/R-94/028, two previous reports from the same program at the International Ground Water Modeling Center (IGWMC) in Colora...

  5. High rate data acquisition from Spacelab/Shuttle

    NASA Technical Reports Server (NTRS)

    Coffey, R.

    1978-01-01

    The need for high data rates from a variety of experiments on Spacelab/Shuttle produced the requirement for the Spacelab High Rate Multiplexer/Demultiplexer system. This system acquires serial digital data at asynchronous bit rates from up to sixteen experiments, two data buses, three voice links, two tape recorders, and a universal time channel. Experiment data rates may vary from 200 bps to 16 Mbps while recorded data rates range from 250 Kbps to 32 Mbps. The High Rate Multiplexer (HRM) accepts these data inputs and forms a serial PCM output at flexible rates up to 48 Mbps. This PCM output is transmitted to ground by a Ku-Band RF link via the Tracking and Data Relay Satellite System (TDRSS) or recorded on board for delayed transmission. A complementary ground based High Rate Demultiplexer (HRDM) accepts and demultiplexes the composite PCM data at ground processing locations.

  6. Impact of Time Lapse on ASCP Board of Certification Medical Laboratory Scientist (MLS) and Medical Laboratory Technician (MLT) Examination Scores.

    PubMed

    Brown, Karen A; Fenn, JoAnn P; Freeman, Vicki S; Fisher, Patrick B; Genzen, Jonathan R; Goodyear, Nancy; Houston, Mary Lunz; O'Brien, Mary Elizabeth; Tanabe, Patricia A

    2015-01-01

    Research in several professional fields has demonstrated that delays (time lapse) in taking certification examinations may result in poorer performance by examinees. Thirteen states and/or territories require licensure for laboratory personnel. A core component of licensure is passing a certification exam. Also, many facilities in states that do not require licensure require certification for employment or preferentially hire certified individuals. To analyze examinee performance on the American Society for Clinical Pathology (ASCP) Board of Certification (BOC) Medical Laboratory Scientist (MLS) and Medical Laboratory Technician (MLT) certification examinations to determine whether delays in taking the examination from the time of program completion are associated with poorer performance. We obtained examination data from April 2013 through December 2014 to look for changes in mean (SD) exam scaled scores and overall pass/fail rates. First-time examinees (MLS: n = 6037; MLT, n = 3920) were divided into 3-month categories based on the interval of time between date of program completion and taking the certification exam. We observed significant decreases in mean (SD) scaled scores and pass rates after the first quarter in MLS and MLT examinations for applicants who delayed taking their examination until the second, third, and fourth quarter after completing their training programs. Those who take the ASCP BOC MLS and MLT examinations are encouraged to do so shortly after completion of their educational training programs. Delays in taking an exam are generally not beneficial to the examinee and result in poorer performance on the exam. Copyright© by the American Society for Clinical Pathology (ASCP).

  7. GEO3D - Three-Dimensional Computer Model of a Ground Source Heat Pump System

    DOE Data Explorer

    James Menart

    2013-06-07

    This file is the setup file for the computer program GEO3D. GEO3D is a computer program written by Jim Menart to simulate vertical wells in conjunction with a heat pump for ground source heat pump (GSHP) systems. This is a very detailed three-dimensional computer model. This program produces detailed heat transfer and temperature field information for a vertical GSHP system.

  8. Computer Program for Thin Wire Antenna over a Perfectly Conducting Ground Plane. [using Galerkins method and sinusoidal bases

    NASA Technical Reports Server (NTRS)

    Richmond, J. H.

    1974-01-01

    A computer program is presented for a thin-wire antenna over a perfect ground plane. The analysis is performed in the frequency domain, and the exterior medium is free space. The antenna may have finite conductivity and lumped loads. The output data includes the current distribution, impedance, radiation efficiency, and gain. The program uses sinusoidal bases and Galerkin's method.

  9. Modeling multiple time series annotations as noisy distortions of the ground truth: An Expectation-Maximization approach.

    PubMed

    Gupta, Rahul; Audhkhasi, Kartik; Jacokes, Zach; Rozga, Agata; Narayanan, Shrikanth

    2018-01-01

    Studies of time-continuous human behavioral phenomena often rely on ratings from multiple annotators. Since the ground truth of the target construct is often latent, the standard practice is to use ad-hoc metrics (such as averaging annotator ratings). Despite being easy to compute, such metrics may not provide accurate representations of the underlying construct. In this paper, we present a novel method for modeling multiple time series annotations over a continuous variable that computes the ground truth by modeling annotator specific distortions. We condition the ground truth on a set of features extracted from the data and further assume that the annotators provide their ratings as modification of the ground truth, with each annotator having specific distortion tendencies. We train the model using an Expectation-Maximization based algorithm and evaluate it on a study involving natural interaction between a child and a psychologist, to predict confidence ratings of the children's smiles. We compare and analyze the model against two baselines where: (i) the ground truth in considered to be framewise mean of ratings from various annotators and, (ii) each annotator is assumed to bear a distinct time delay in annotation and their annotations are aligned before computing the framewise mean.

  10. Bibliography of Regional Aquifer-System Analysis Program of the US Geological Survey, 1978-91

    USGS Publications Warehouse

    Sun, Ren Jen; Weeks, John B.

    1991-01-01

    The Regional Aquifer-System Analysis (RASA) Program of the U.S. Geological Survey was initiated in 1978. The purpose of this program is to define the regional geohydrology and establish a framework of background information on geology, hydrology, and geochemistry of the Nation's important aquifer systems. This information is critically needed to develop an understanding of the Nation's major ground-water flow systems and to support better management of ground-water resources.As of May 1991, 28 of the Nation's major aquifer systems have been identified for study under this program. Of these, 17 regional aquifer-system studies have been completed, and 8 studies are ongoing. Starting in 1988, the program devoted part of its resources to compilation of a Nationwide ground-water atlas that presents a comprehensive summary of the Nation's major ground-water resources. The atlas, which is designed in a graphical format supported by descriptive text, will serve as a basic reference for the location, geography, geology, and hydrologic characteristics of the major aquifers in the Nation.This bibliography lists the published 876 reports resulting from various studies of the program, from 1978 through May 1991. The list of reports for each study is placed after a brief description of that study.

  11. Are we able to reduce the mortality and morbidity of oral cancer; Some considerations

    PubMed Central

    2013-01-01

    Oral cancer makes up 1%-2% of all cancers that may arise in the body. The majority of oral cancers consists of squamous cell carcinomas. Oral cancer carries a considerable mortality rate, being mainly dependent on the stage of the disease at admission. Worldwide some 50% of the patients with oral cancer present with advanced disease. There are several ways of trying to diagnose oral cancer in a lower tumor stage, being 1) mass screening or screening in selected patients, 2) reduction of patients’ delay, and 3) reduction of doctors’ delay. Oral cancer population-based screening (“mass screening”) programs do not meet the guidelines for a successful outcome. There may be some benefit when focusing on high-risk groups, such as heavy smokers and heavy drinkers. Reported reasons for patients’ delay range from fear of a diagnosis of cancer, limited accessibility of primary health care, to unawareness of the possibility of malignant oral diseases. Apparently, information campaigns in news programs and TV have little effect on patients’ delay. Mouth self-examination may have some value in reducing patients’ delay. Doctors’ delay includes dentists’ delay and diagnostic delay caused by other medical and dental health care professionals. Doctors’ delay may vary from almost zero days up to more than six months. Usually, morbidity of cancer treatment is measured by quality of life (QoL) questionnaires. In the past decades this topic has drawn a lot of attention worldwide. It is a challenge to decrease the morbidity that is associated with the various treatment modalities that are used in oral cancer without substantially compromising the survival rate. Smoking cessation contributes to reducing the risk of oral cancers, with a 50% reduction in risk within five years. Indeed, risk factor reduction seems to be the most effective tool in an attempt to decrease the morbidity and mortality of oral cancer. Key words:Oral cancer, early diagnosis, quality of life. PMID:23229266

  12. PV Systems Reliability Final Technical Report: Ground Fault Detection

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lavrova, Olga; Flicker, Jack David; Johnson, Jay

    We have examined ground faults in PhotoVoltaic (PV) arrays and the efficacy of fuse, current detection (RCD), current sense monitoring/relays (CSM), isolation/insulation (Riso) monitoring, and Ground Fault Detection and Isolation (GFID) using simulations based on a Simulation Program with Integrated Circuit Emphasis SPICE ground fault circuit model, experimental ground faults installed on real arrays, and theoretical equations.

  13. Teleseismic P-wave Delay Time Tomography of the southern Superior Province and Midcontinent Rift System (MRS) Region

    NASA Astrophysics Data System (ADS)

    Bollmann, T. A.; van der Lee, S.; Frederiksen, A. W.; Wolin, E.; Aleqabi, G. I.; Revenaugh, J.; Wiens, D. A.; Darbyshire, F. A.

    2014-12-01

    The Superior Province Rifting Earthscope Experiment (SPREE) and the northern midwest footprint of USArray's Transportable Array recorded continuous ground motion for a period of 2.5 years. From around 400 M>5.5 teleseismic earthquakes recorded at 337 stations, we measured body wave delay times for 255 of these earthquakes. The P wave delays are accumulated over more than 45 thousand wave paths with turning points in the lower mantle. We combine these delay times with a similar number delay times used in previous tomographic studies of the study region. The latter delay times stem from fewer stations, including Polaris and CNSN stations, and nearly a thousand earthquakes. We combine these two sets of delay times to image the three-dimensional distribution of seismic velocity variations beneath the southern Superior Province and surrounding provinces. This combined data coverage is illustrated in the accompanying figure for a total number of 447 stations . The coverage and the combined delays form the best configuration yet to image the three-dimensional distribution of seismic P and S-wave velocity variations beneath the southern Superior and surrounding provinces. Closely spaced stations (~12 km) along and across the MRS provide higher resolving power for lithospheric structure beneath the rift system. Conforming to expectations that the entire region is underlain by thick, cool lithosphere, a mean delay of -.55 +/- .54 s. This is very similar to the mean delays -.6s +/- .37s measured for this region before 2012. Event corrections range from -.2 +/-.54 s and correlate with tectonics for 80% of the earthquakes. An inversion of these nearly one hundred thousand P and around thirty thousand S-wave delay times for high-resolution P and S-wave velocity structure, respectively, does not show structures that are obviously related to the crustal signature of the MRS. None of structures imaged, align with or have a similar shape to the high Mid-continent Gravity Anomaly (MGA). However, a low-velocity structure is imaged in the lithosphere just east of the MGA.

  14. 75 FR 77869 - Notice of a Regional Waiver of Section 1605 (Buy American Requirement) of the American Recovery...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-14

    ... Office of Administration and Resources Management has concurred on this decision to make an exception to... ARRA Program Management Analyst, Grants and Strategic Planning Unit, Office of Water & Watersheds (OWW... unreasonable delay in its completion. Such delay would also directly conflict with a fundamental economic...

  15. An Analysis of Student Programmatic Delays in Postsecondary Flight Training Programs: A National Study.

    ERIC Educational Resources Information Center

    Bryan, Jon L.; Thuemmel, William L.

    A study analyzed student delays in flight certification at 106 University Aviation Association (UAA) member postsecondary institutions. After a pilot survey of 5 institutions, questionnaires were mailed to the 101 remaining UAA administrators; 80 responses were returned. Correlations of items in the survey were analyzed and significant…

  16. The Delay Hypothesis: The Manifestation of Media Effects over Time

    ERIC Educational Resources Information Center

    Jensen, Jakob D.; Bernat, Jennifer K.; Wilson, Kari M.; Goonewardene, Julie

    2011-01-01

    A between-participants experiment (N = 147) tested for the presence of a delayed effect following exposure to an episode of a legal drama that contained false information. Participants were more likely to endorse false beliefs if they were queried two weeks after watching the program rather than immediately following exposure. The relationship…

  17. Predicting Declassification of Preschool Disabled Students through a Combination of Variables

    ERIC Educational Resources Information Center

    DeFina, Cynthia E.

    2017-01-01

    Early learning programs impact students, especially those with developmental delays. These formative years play a vital role in the overall development of the students' skills. School districts want to reach these special education students during these crucial years to help close the developmental delay gap. This quantitative study examines the…

  18. A Classroom Collaborative Strategy Designed To Improve Oral Motor Skill Deficits in Developmentally Delayed Pre-Kindergarten Students.

    ERIC Educational Resources Information Center

    Hoffman, Lorri J.

    This practicum report describes the design and implementation of an oral motor program to increase the verbal communication skills of seven pre-kindergarten children with developmental delays, including hypotonia in oral motor development with moderate to severe articulation difficulties. Collaborative planning by the pre-kindergarten special…

  19. Movement Exploration as a Technique for Teaching Pre-Swimming Skills to Students with Developmental Delays.

    ERIC Educational Resources Information Center

    Buis, Joyce M.; Schane, Catherine S.

    1980-01-01

    Background, rationale, and techniques for using movement exploration to teach preswimming skills to developmentally delayed persons are given. Objectives (beyond the primary one of safety) of such a program include body awareness, spatial awareness, movement, and perceptual motor functions. Guidelins for activity selection and adaptation are…

  20. The American mobile satellite system

    NASA Technical Reports Server (NTRS)

    Garner, William B.

    1990-01-01

    During 1989, the American Mobile Satellite Corporation (AMSC) was authorized to construct, launch, and operate satellites to provide mobile satellite services (MSS) to the U.S. and Puerto Rico. The AMSC has undertaken three major development programs to bring a full range of MSS services to the U.S. The first program is the space segment program that will result in the construction and launch of the satellites as well as the construction and installation of the supporting ground telemetry and command system. The second segment will result in the specification, design, development, construction, and installation of the Network Control System necessary for managing communications access to the satellites, and the specification and development of ground equipment for standard circuit switched and packet switched communications services. The third program is the Phase 1 program to provide low speed data services within the U.S. prior to availability of the AMSC satellites and ground segment. Described here are the present status and plans for these three programs as well as an update on related business arrangements and regulatory matters.

  1. The effects of grounding (earthing) on inflammation, the immune response, wound healing, and prevention and treatment of chronic inflammatory and autoimmune diseases

    PubMed Central

    Oschman, James L; Chevalier, Gaétan; Brown, Richard

    2015-01-01

    Multi-disciplinary research has revealed that electrically conductive contact of the human body with the surface of the Earth (grounding or earthing) produces intriguing effects on physiology and health. Such effects relate to inflammation, immune responses, wound healing, and prevention and treatment of chronic inflammatory and autoimmune diseases. The purpose of this report is two-fold: to 1) inform researchers about what appears to be a new perspective to the study of inflammation, and 2) alert researchers that the length of time and degree (resistance to ground) of grounding of experimental animals is an important but usually overlooked factor that can influence outcomes of studies of inflammation, wound healing, and tumorigenesis. Specifically, grounding an organism produces measurable differences in the concentrations of white blood cells, cytokines, and other molecules involved in the inflammatory response. We present several hypotheses to explain observed effects, based on current research results and our understanding of the electronic aspects of cell and tissue physiology, cell biology, biophysics, and biochemistry. An experimental injury to muscles, known as delayed onset muscle soreness, has been used to monitor the immune response under grounded versus ungrounded conditions. Grounding reduces pain and alters the numbers of circulating neutrophils and lymphocytes, and also affects various circulating chemical factors related to inflammation. PMID:25848315

  2. Shuttle's 160 hour ground turnaround - A design driver

    NASA Technical Reports Server (NTRS)

    Widick, F.

    1977-01-01

    Turnaround analysis added a new dimension to the Space Program with the advent of the Space Shuttle. The requirement to turn the flight hardware around in 160 working hours from landing to launch was a significant design driver and a useful tool in forcing the integration of flight and ground systems design to permit an efficient ground operation. Although there was concern that time constraints might increase program costs, the result of the analysis was to minimize facility requirements and simplify operations with resultant cost savings.

  3. MODFLOW-2005 : the U.S. Geological Survey modular ground-water model--the ground-water flow process

    USGS Publications Warehouse

    Harbaugh, Arlen W.

    2005-01-01

    This report presents MODFLOW-2005, which is a new version of the finite-difference ground-water model commonly called MODFLOW. Ground-water flow is simulated using a block-centered finite-difference approach. Layers can be simulated as confined or unconfined. Flow associated with external stresses, such as wells, areal recharge, evapotranspiration, drains, and rivers, also can be simulated. The report includes detailed explanations of physical and mathematical concepts on which the model is based, an explanation of how those concepts are incorporated in the modular structure of the computer program, instructions for using the model, and details of the computer code. The modular structure consists of a MAIN Program and a series of highly independent subroutines. The subroutines are grouped into 'packages.' Each package deals with a specific feature of the hydrologic system that is to be simulated, such as flow from rivers or flow into drains, or with a specific method of solving the set of simultaneous equations resulting from the finite-difference method. Several solution methods are incorporated, including the Preconditioned Conjugate-Gradient method. The division of the program into packages permits the user to examine specific hydrologic features of the model independently. This also facilitates development of additional capabilities because new packages can be added to the program without modifying the existing packages. The input and output systems of the computer program also are designed to permit maximum flexibility. The program is designed to allow other capabilities, such as transport and optimization, to be incorporated, but this report is limited to describing the ground-water flow capability. The program is written in Fortran 90 and will run without modification on most computers that have a Fortran 90 compiler.

  4. Delay/Disruption Tolerant Networking for the International Space Station (ISS)

    NASA Technical Reports Server (NTRS)

    Schlesinger, Adam; Willman, Brett M.; Pitts, Lee; Davidson, Suzanne R.; Pohlchuck, William A.

    2017-01-01

    Disruption Tolerant Networking (DTN) is an emerging data networking technology designed to abstract the hardware communication layer from the spacecraft/payload computing resources. DTN is specifically designed to operate in environments where link delays and disruptions are common (e.g., space-based networks). The National Aeronautics and Space Administration (NASA) has demonstrated DTN on several missions, such as the Deep Impact Networking (DINET) experiment, the Earth Observing Mission 1 (EO-1) and the Lunar Laser Communication Demonstration (LLCD). To further the maturation of DTN, NASA is implementing DTN protocols on the International Space Station (ISS). This paper explains the architecture of the ISS DTN network, the operational support for the system, the results from integrated ground testing, and the future work for DTN expansion.

  5. E-GVAP, the EIG EUMETNET GNSS Water Vapour Programme

    NASA Astrophysics Data System (ADS)

    Jones, J.; de Haan, S.; Vedel, H.

    2011-12-01

    The main purpose of E-GVAP is to deliver near real-time (NRT) ground based GNSS delay data for usage in operational meteorology. This involves the collection and processing of raw GNSS data to estimate zenith total delay (ZTD) and subsequent collection and distribution of ZTD data to European national meteorological services. Validation and quality control, production of 2D animated water vapour maps, development of best practices for GNSS data processing and data usage in Numerical Weather Prediction (NWP) models, are other important aspects. Furthermore there is a current push for more real-time observations which would have positive impacts in high both resolution NWP and for nowcasting applications. We present an overview of the current status of E-GVAP.

  6. Delay/Disruption Tolerant Networks (DTN): Testing and Demonstration for Lunar Surface Applications

    NASA Technical Reports Server (NTRS)

    2009-01-01

    This slide presentation reviews the testing of the Delay/Disruption Tolerant Network (DTN) designed for use with Lunar Surface applications. This is being done through the DTN experimental Network (DEN), that permit access and testing by other NASA centers, DTN team members and protocol developers. The objective of this work is to demonstrate DTN for high return applications in lunar scenarios, provide DEN connectivity with analogs of Constellation elements, emulators, and other resources from DTN Team Members, serve as a wireless communications staging ground for remote analog excursions and enable testing of detailed communication scenarios and evaluation of network performance. Three scenarios for DTN on the Lunar surface are reviewed: Motion imagery, Voice and sensor telemetry, and Navigation telemetry.

  7. Generating Stereoscopic Television Images With One Camera

    NASA Technical Reports Server (NTRS)

    Coan, Paul P.

    1996-01-01

    Straightforward technique for generating stereoscopic television images involves use of single television camera translated laterally between left- and right-eye positions. Camera acquires one of images (left- or right-eye image), and video signal from image delayed while camera translated to position where it acquires other image. Length of delay chosen so both images displayed simultaneously or as nearly simultaneously as necessary to obtain stereoscopic effect. Technique amenable to zooming in on small areas within broad scenes. Potential applications include three-dimensional viewing of geological features and meteorological events from spacecraft and aircraft, inspection of workpieces moving along conveyor belts, and aiding ground and water search-and-rescue operations. Also used to generate and display imagery for public education and general information, and possible for medical purposes.

  8. Dayside ionospheric convection changes in response to long-period interplanetary magnetic field oscillations - Determination of the ionospheric phase velocity

    NASA Technical Reports Server (NTRS)

    Saunders, M. A.; Freeman, M. P.; Southwood, D. J.; Cowley, S. W.; Lockwood, M.; Samson, J. C.; Farrugia, C. J.; Hughes, T. J.

    1992-01-01

    Ground magnetic field perturbations recorded by the CANOPUS magnetometer network in the 7 to 13 MLT sector are used to examine how reconfigurations of the dayside polar ionospheric flow take place in response to north-south changes of the IMF. During the 6-h interval in question, IMF Bz oscillates between +/- 7 nT with about a 1-h period. Corresponding variations in the ground magnetic disturbance are observed which we infer are due to changes in ionospheric flow. Cross correlation of the data obtained from two ground stations at 73.5 deg magnetic latitude, but separated by about 2 hours in MLT, shows that changes in the flow are initiated in the prenoon sector (about 10 MLT) and then spread outward toward dawn and dusk with a phase speed of about 5 km/s over the longitude range about 8 to 12 MLT, slowing to about 2 km/s outside this range. Cross correlating the data from these ground stations with IMP 8 IMF Bz records produces a MLT variation in the ground response delay relative to the IMF which is compatible with these deduced phase speeds.

  9. Ground Taxi Navigation Problems and Training Solutions

    NASA Technical Reports Server (NTRS)

    Quinn, Cheryl; Walter, Kim E.; Rosekind, Mark (Technical Monitor)

    1997-01-01

    Adverse weather conditions can put considerable strain on the National Airspace System. Even small decreases in visibility on the airport surface can create delays, hinder safe movement and lead to errors. Studies of Aviation Safety Reporting System (ASRS) surface movement incidents support the need for technologies and procedures to improve ground operations in low-visibility conditions. This study examined 139 ASRS reports of low-visibility surface movement incidents at 10 major U.S. airports. Errors were characterized in terms of incident type, contributing factors and consequences. The incidents in the present sample were comprised of runway transgressions, taxiway excursions and ground conflicts. The primary contributing factors were Airport Layout and Markings, Communication and Distraction. In half the incidents the controller issued a new clearance or the flight crew took an evasive action and in the remaining half, no recovery attempt was made because the error was detected after the fact. By gaining a better understanding the factors that affect crew navigation in low visibility and the types of errors that are likely to occur, it will be possible to develop more robust technologies to aid pilots in the ground taxi task. Implications for crew training and procedure development for low-visibility ground taxi are also discussed.

  10. Satellite Delivery of Aviation Weather Data

    NASA Technical Reports Server (NTRS)

    Kerczewski, Robert J.; Haendel, Richard

    2001-01-01

    With aviation traffic continuing to increase worldwide, reducing the aviation accident rate and aviation schedule delays is of critical importance. In the United States, the National Aeronautics and Space Administration (NASA) has established the Aviation Safety Program and the Aviation System Capacity Program to develop and test new technologies to increase aviation safety and system capacity. Weather is a significant contributor to aviation accidents and schedule delays. The timely dissemination of weather information to decision makers in the aviation system, particularly to pilots, is essential in reducing system delays and weather related aviation accidents. The NASA Glenn Research Center is investigating improved methods of weather information dissemination through satellite broadcasting directly to aircraft. This paper describes an on-going cooperative research program with NASA, Rockwell Collins, WorldSpace, Jeppesen and American Airlines to evaluate the use of satellite digital audio radio service (SDARS) for low cost broadcast of aviation weather information, called Satellite Weather Information Service (SWIS). The description and results of the completed SWIS Phase 1 are presented, and the description of the on-going SWIS Phase 2 is given.

  11. Ordering Traces Logically to Identify Lateness in Message Passing Programs

    DOE PAGES

    Isaacs, Katherine E.; Gamblin, Todd; Bhatele, Abhinav; ...

    2015-03-30

    Event traces are valuable for understanding the behavior of parallel programs. However, automatically analyzing a large parallel trace is difficult, especially without a specific objective. We aid this endeavor by extracting a trace's logical structure, an ordering of trace events derived from happened-before relationships, while taking into account developer intent. Using this structure, we can calculate an operation's delay relative to its peers on other processes. The logical structure also serves as a platform for comparing and clustering processes as well as highlighting communication patterns in a trace visualization. We present an algorithm for determining this idealized logical structure frommore » traces of message passing programs, and we develop metrics to quantify delays and differences among processes. We implement our techniques in Ravel, a parallel trace visualization tool that displays both logical and physical timelines. Rather than showing the duration of each operation, we display where delays begin and end, and how they propagate. As a result, we apply our approach to the traces of several message passing applications, demonstrating the accuracy of our extracted structure and its utility in analyzing these codes.« less

  12. A World Wide Web-based antimicrobial stewardship program improves efficiency, communication, and user satisfaction and reduces cost in a tertiary care pediatric medical center.

    PubMed

    Agwu, Allison L; Lee, Carlton K K; Jain, Sanjay K; Murray, Kara L; Topolski, Jason; Miller, Robert E; Townsend, Timothy; Lehmann, Christoph U

    2008-09-15

    Antimicrobial stewardship programs aim to reduce inappropriate hospital antimicrobial use. At the Johns Hopkins Children's Medical and Surgical Center (Baltimore, MD), we implemented a World Wide Web-based antimicrobial restriction program to address problems with the existing restriction program. A user survey identified opportunities for improvement of an existing antimicrobial restriction program and resulted in subsequent design, implementation, and evaluation of a World Wide Web-based antimicrobial restriction program at a 175-bed, tertiary care pediatric teaching hospital. The program provided automated clinical decision support, facilitated approval, and enhanced real-time communication among prescribers, pharmacists, and pediatric infectious diseases fellows. Approval status, duration, and rationale; missing request notifications; and expiring approvals were stored in a database that is accessible via a secure Intranet site. Before and after implementation of the program, user satisfaction, reports of missed and/or delayed doses, antimicrobial dispensing times, and cost were evaluated. After implementation of the program, there was a $370,069 reduction in projected annual cost associated with restricted antimicrobial use and an 11.6% reduction in the number of dispensed doses. User satisfaction increased from 22% to 68% and from 13% to 69% among prescribers and pharmacists, respectively. There were 21% and 32% reductions in the number of prescriber reports of missed and delayed doses, respectively, and there was a 37% reduction in the number of pharmacist reports of delayed approvals; measured dispensing times were unchanged (P = .24). In addition, 40% fewer restricted antimicrobial-related phone calls were noted by the pharmacy. The World Wide Web-based antimicrobial approval program led to improved communication, more-efficient antimicrobial administration, increased user satisfaction, and significant cost savings. Integrated tools, such as this World Wide Web-based antimicrobial approval program, will effectively enhance antimicrobial stewardship programs.

  13. Genetic differential susceptibility in literacy-delayed children: a randomized controlled trial on emergent literacy in kindergarten.

    PubMed

    Plak, Rachel D; Kegel, Cornelia A T; Bus, Adriana G

    2015-02-01

    In this randomized controlled trial, 508 5-year-old kindergarten children participated, of whom 257 were delayed in literacy skills because they belonged to the lowest quartile of a national standard literacy test. We tested the hypothesis that some children are more susceptible to school-entry educational interventions than their peers due to their genetic makeup, and thus whether the dopamine receptor D4 gene moderated intervention effects. Children were randomly assigned to a control condition or one of two interventions involving computer programs tailored to the literacy needs of delayed pupils: Living Letters for alphabetic knowledge and Living Books for text comprehension. Effects of Living Books met the criteria of differential susceptibility. For carriers of the dopamine receptor D4 gene seven-repeat allele (about one-third of the delayed group), the Living Books program was an important addition to the common core curriculum in kindergarten (effect size d = 0.56), whereas the program did not affect the other children (d = -0.09). The same seven-repeat carriers benefited more from Living Letters than did the noncarriers, as reflected in effect sizes of 0.63 and 0.34, respectively, although such differences did not fulfill the statistical criteria for differential susceptibility. The implications of differential susceptibility for education and regarding the crucial question "what works for whom?" are discussed.

  14. Maternal Obesity: Risks for Developmental Delays in Early Childhood.

    PubMed

    Duffany, Kathleen O'Connor; McVeigh, Katharine H; Kershaw, Trace S; Lipkind, Heather S; Ickovics, Jeannette R

    2016-02-01

    To assess the risk for neurodevelopmental delays for children of mothers who were obese (≥200 pounds) prior to pregnancy, and to characterize delays associated with maternal obesity among children referred to and found eligible to receive Early Intervention Program services. We conducted a retrospective cohort study (N = 541,816) using a population-based New York City data warehouse with linked birth and Early Intervention data. Risks for children suspected of a delay and 'significantly delayed', with two moderate or one severe delay, were calculated. Among the group of children eligible by delay for Early Intervention, analyses assessed risk for being identified with a moderate-to-severe delay across each of five functional domains as well as risks for multiple delays. Children of mothers who were obese were more likely to be suspected of a delay (adjusted RR 1.19 [CI 1.15-1.22]) and borderline association for 'significantly delayed' (adjusted RR 1.01 [CI 1.00-1.02). Among children eligible by delay, children of mothers who were obese evidenced an increased risk for moderate-to-severe cognitive (adjusted RR 1.04 [CI 1.02-1.07]) and physical (adjusted RR 1.04 [CI 1.01-1.08]) delays and for global developmental delay (adjusted RR 1.05 [CI 1.01-1.08]). Maternal obesity is associated with increased risk of developmental delay in offspring. Among children with moderate or severe delays, maternal obesity is associated with increased risk of cognitive and physical delays as well as with increased risk for global developmental delay. While causation remains uncertain, this adds to the growing body of research reporting an association between maternal obesity and neurodevelopmental delays in offspring.

  15. NGA-West2 Research Project

    USGS Publications Warehouse

    Bozorgnia, Yousef; Abrahamson, Norman A.; Al Atik, Linda; Ancheta, Timothy D.; Atkinson, Gail M.; Baker, Jack W.; Baltay, Annemarie S.; Boore, David M.; Campbell, Kenneth W.; Chiou, Brian S.J.; Darragh, Robert B.; Day, Steve; Donahue, Jennifer; Graves, Robert W.; Gregor, Nick; Hanks, Thomas C.; Idriss, I. M.; Kamai, Ronnie; Kishida, Tadahiro; Kottke, Albert; Mahin, Stephen A.; Rezaeian, Sanaz; Rowshandel, Badie; Seyhan, Emel; Shahi, Shrey; Shantz, Tom; Silva, Walter; Spudich, Paul A.; Stewart, Jonathan P.; Watson-Lamprey, Jennie; Wooddell, Kathryn; Youngs, Robert

    2014-01-01

    The NGA-West2 project is a large multidisciplinary, multi-year research program on the Next Generation Attenuation (NGA) models for shallow crustal earthquakes in active tectonic regions. The research project has been coordinated by the Pacific Earthquake Engineering Research Center (PEER), with extensive technical interactions among many individuals and organizations. NGA-West2 addresses several key issues in ground-motion seismic hazard, including updating the NGA database for a magnitude range of 3.0–7.9; updating NGA ground-motion prediction equations (GMPEs) for the “average” horizontal component; scaling response spectra for damping values other than 5%; quantifying the effects of directivity and directionality for horizontal ground motion; resolving discrepancies between the NGA and the National Earthquake Hazards Reduction Program (NEHRP) site amplification factors; analysis of epistemic uncertainty for NGA GMPEs; and developing GMPEs for vertical ground motion. This paper presents an overview of the NGA-West2 research program and its subprojects.

  16. EOS mapping accuracy study

    NASA Technical Reports Server (NTRS)

    Forrest, R. B.; Eppes, T. A.; Ouellette, R. J.

    1973-01-01

    Studies were performed to evaluate various image positioning methods for possible use in the earth observatory satellite (EOS) program and other earth resource imaging satellite programs. The primary goal is the generation of geometrically corrected and registered images, positioned with respect to the earth's surface. The EOS sensors which were considered were the thematic mapper, the return beam vidicon camera, and the high resolution pointable imager. The image positioning methods evaluated consisted of various combinations of satellite data and ground control points. It was concluded that EOS attitude control system design must be considered as a part of the image positioning problem for EOS, along with image sensor design and ground image processing system design. Study results show that, with suitable efficiency for ground control point selection and matching activities during data processing, extensive reliance should be placed on use of ground control points for positioning the images obtained from EOS and similar programs.

  17. Revised ground-water monitoring compliance plan for the 300 area process trenches

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schalla, R.; Aaberg, R.L.; Bates, D.J.

    1988-09-01

    This document contains ground-water monitoring plans for process-water disposal trenches located on the Hanford Site. These trenches, designated the 300 Area Process Trenches, have been used since 1973 for disposal of water that contains small quantities of both chemicals and radionuclides. The ground-water monitoring plans contained herein represent revision and expansion of an effort initiated in June 1985. At that time, a facility-specific monitoring program was implemented at the 300 Area Process Trenches as part of a regulatory compliance effort for hazardous chemicals being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements formore » interim-status facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The applicable monitoring requirements are described in the Resource Conservation and Recovery Act (RCRA), 40 CFR 265.90 of the federal regulations, and in WAC 173-303-400 of Washington State's regulations (Washington State Department of Ecology 1986). The program implemented for the process trenches was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. The plans for the program, contained in a document prepared by the US Department of Energy (USDOE) in 1985, called for monthly sampling of 14 of the 37 existing monitoring wells at the 300 Area plus the installation and sampling of 2 new wells. 27 refs., 25 figs., 15 tabs.« less

  18. Adaptation for Planting and Irrigation Decisions to Changing Monsoon Regime in Northeast India: Risk-based Hydro-economic Optimization

    NASA Astrophysics Data System (ADS)

    Zhu, T.; Cai, X.

    2013-12-01

    Delay in onset of Indian summer monsoon becomes increasingly frequent. Delayed monsoon and occasional monsoon failures seriously affect agricultural production in the northeast as well as other parts of India. In the Vaishali district of the Bihar State, Monsoon rainfall is very skewed and erratic, often concentrating in shorter durations. Farmers in Vaishali reported that delayed Monsoon affected paddy planting and, consequently delayed cropping cycle, putting crops under the risks of 'terminal heat.' Canal system in the district does not function due to lack of maintenance; irrigation relies almost entirely on groundwater. Many small farmers choose not to irrigate when monsoon onset is delayed due to high diesel price, leading to reduced production or even crop failure. Some farmers adapt to delayed onset of Monsoon by planting short-duration rice, which gives the flexibility for planting the next season crops. Other sporadic autonomous adaptation activities were observed as well, with various levels of success. Adaptation recommendations and effective policy interventions are much needed. To explore robust options to adapt to the changing Monsoon regime, we build a stochastic programming model to optimize revenues of farmer groups categorized by landholding size, subject to stochastic Monsoon onset and rainfall amount. Imperfect probabilistic long-range forecast is used to inform the model onset and rainfall amount probabilities; the 'skill' of the forecasting is measured using probabilities of correctly predicting events in the past derived through hindcasting. Crop production functions are determined using self-calibrating Positive Mathematical Programming approach. The stochastic programming model aims to emulate decision-making behaviors of representative farmer agents through making choices in adaptation, including crop mix, planting dates, irrigation, and use of weather information. A set of technological and policy intervention scenarios are tested, including irrigation subsidies, drought and heat-tolerant crop varieties, and enhancing agricultural extension. A portfolio of prioritized adaption options are recommended for the study area.

  19. Optimal therapies of a virus replication model with pharmacological delays based on reverse transcriptase inhibitors and protease inhibitors

    NASA Astrophysics Data System (ADS)

    Pei, Yongzhen; Li, Changguo; Liang, Xiyin

    2017-11-01

    A short delay in the pharmacological effect on account of the time required for drug absorption, distribution, and penetration into target cells after application of any anti-viral drug, is defined by the pharmacological delay (Herz et al 1996 Proc. Natl Acad. Sci. USA 93 7247-51). In this paper, a virus replication model with Beddington-DeAngelis incidence rate and the pharmacological and intracellular delays is presented to describe the treatment to cure the virus infection. The optimal controls represent the efficiency of reverse transcriptase inhibitors and protease inhibitors in suppressing viral production and prohibiting new infections. Due to the fact that both the control and state variables contain delays, we derive a necessary conditions for our optimal problem. Based on these results, numerical simulations are implemented not only to show the optimal therapeutic schedules for different infection and release rates, but also to compare the effective of three treatment programs. Furthermore, comparison of therapeutic effects under different maximum tolerable dosages is shown. Our research indicates that (1) the proper and specific treatment program should be determined according to the infection rates of different virus particles; (2) the optimal combined drug treatment is the most efficient; (3) the appropriate proportion of medicament must be formulated during the therapy due to the non-monotonic relationship between maximum tolerable dosages and therapeutic effects; (4) the therapeutic effect is advantageous when the pharmacological delay is considered.

  20. COSMOGRAIL: the COSmological MOnitoring of GRAvItational Lenses: XVI. Time delays for the quadruply imaged quasar DES J0408–5354 with high-cadence photometric monitoring* [COSMOGRAIL XVI: Time delays for the quadruply imaged quasar DES J0408–5354 with high-cadence photometric monitoring

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Courbin, F.; Bonvin, V.; Buckley-Geer, E.

    Here, we present time-delay measurements for the new quadruple imaged quasar DES J0408–5354, the first quadruple imaged quasar found in the Dark Energy Survey (DES). Our result is made possible by implementing a new observational strategy using almost daily observations with the MPIA 2.2 m telescope at La Silla observatory and deep exposures reaching a signal-to-noise ratio of about 1000 per quasar image. This data qualityallows us to catch small photometric variations (a few mmag rms) of the quasar, acting on temporal scales much shorter than microlensing, and hence making the time delay measurement very robust against microlensing. In onlymore » seven months we very accurately measured one of the time delays in DES J0408–5354: Δt(AB) = –112.1 ± 2.1 days (1.8%) using only the MPIA 2.2 m data. In combination with data taken with the 1.2 m Euler Swiss telescope, we also measured two delays involving the D component of the system Δt(AD) = –155.5 ± 12.8 days (8.2%) and Δt(BD) = –42.4 ± 17.6 days (41%), where all the error bars include systematics. Turning these time delays into cosmological constraints will require deep Hubble Space Telescope (HST) imaging or ground-based adaptive optics (AO), and information on the velocity field of the lensing galaxy.« less

  1. COSMOGRAIL: the COSmological MOnitoring of GRAvItational Lenses: XVI. Time delays for the quadruply imaged quasar DES J0408–5354 with high-cadence photometric monitoring* [COSMOGRAIL XVI: Time delays for the quadruply imaged quasar DES J0408–5354 with high-cadence photometric monitoring

    DOE PAGES

    Courbin, F.; Bonvin, V.; Buckley-Geer, E.; ...

    2018-01-09

    Here, we present time-delay measurements for the new quadruple imaged quasar DES J0408–5354, the first quadruple imaged quasar found in the Dark Energy Survey (DES). Our result is made possible by implementing a new observational strategy using almost daily observations with the MPIA 2.2 m telescope at La Silla observatory and deep exposures reaching a signal-to-noise ratio of about 1000 per quasar image. This data qualityallows us to catch small photometric variations (a few mmag rms) of the quasar, acting on temporal scales much shorter than microlensing, and hence making the time delay measurement very robust against microlensing. In onlymore » seven months we very accurately measured one of the time delays in DES J0408–5354: Δt(AB) = –112.1 ± 2.1 days (1.8%) using only the MPIA 2.2 m data. In combination with data taken with the 1.2 m Euler Swiss telescope, we also measured two delays involving the D component of the system Δt(AD) = –155.5 ± 12.8 days (8.2%) and Δt(BD) = –42.4 ± 17.6 days (41%), where all the error bars include systematics. Turning these time delays into cosmological constraints will require deep Hubble Space Telescope (HST) imaging or ground-based adaptive optics (AO), and information on the velocity field of the lensing galaxy.« less

  2. Geodesy by radio interferometry: Water vapor radiometry for estimation of the wet delay

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elgered, G.; Davis, J.L.; Herring, T.A.

    1991-04-10

    An important source of error in very-long-baseline interferometry (VLBI) estimates of baseline length is unmodeled variations of the refractivity of the neutral atmosphere along the propagation path of the radio signals. The authors present and discuss the method of using data from a water vapor readiometer (WVR) to correct for the propagation delay caused by atmospheric water vapor, the major cause of these variations. Data from different WVRs are compared with estimated propagation delays obtained by Kalman filtering of the VLBI data themselves. The consequences of using either WVR data of Kalman filtering to correct for atmospheric propagation delay atmore » the Onsala VLBI site are investigated by studying the repeatability of estimated baseline lengths from Onsala to several other sites. The lengths of the baselines range from 919 to 7,941 km. The repeatability obtained for baseline length estimates shows that the methods of water vapor radiometry and Kalman filtering offer comparable accuracies when applied to VLBI observations obtained in the climate of the Swedish west coast. The use of WVR data yielded a 13% smaller weighted-root-mean-square (WRMS) scatter of the baseline length estimates compared to the use of a Kalman filter. It is also clear that the best minimum elevation angle for VLBI observations depends on the accuracy of the determinations of the total propagation delay to be used, since the error in this delay increases with increasing air mass. For use of WVR data along with accurate determinations of total surface pressure, the best minimum is about 20{degrees}; for use of a model for the wet delay based on the humidity and temperature at the ground, the best minimum is about 35{degrees}.« less

  3. Shuttle Ground Operations Efficiencies/Technologies (SGOE/T) study. Volume 1: Executive summary

    NASA Technical Reports Server (NTRS)

    Scholz, A. L.; Hart, M. T.; Lowry, D. J.

    1987-01-01

    Methods and technolgoy were defined to reduce the overall operations cost of a major space program. Space Shuttle processing at Kennedy Space Center (KSC) was designed as the working model that would be the source of the operational information. Methods of improving efficiency of ground operations were assessed and technology elements that could reduce cost identified. Emphasis is on: (1) specific technology items and (2) management approaches required to develop and support efficient ground operations. Prime study results are to be recommendations on how to achieve more efficient operations and identification of existing or new technology that would make vehicle processing in both the current program and future programs more efficient and, therefore, less costly.

  4. Circadian rhythms in Macaca mulatta monkeys during Bion 11 flight

    NASA Technical Reports Server (NTRS)

    Alpatov, A. M.; Hoban-Higgins, T. M.; Klimovitsky, V. Y.; Tumurova, E. G.; Fuller, C. A.

    2000-01-01

    Circadian rhythms of primate brain temperature, head and ankle skin temperature, motor activity, and heart rate were studied during spaceflight and on the ground. In space, the circadian rhythms of all the parameters were synchronized with diurnal Zeitgebers. However, in space the brain temperature rhythm showed a significantly more delayed phase angle, which may be ascribed to an increase of the endogenous circadian period.

  5. Proceedings of the Meeting of the Coordinating Group on Modern Control Theory (2nd) 10-11 December 1980, Aberdeen Proving Ground, Maryland. Part 1

    DTIC Science & Technology

    1981-04-01

    The results are summarizcd in the following lemma, Lemna 1: A canonical delayed-measurement observer for the system described by (30) aW-JT-) is...is probably due to the higher total accuracy of the systes with the extra support. However, in both cases, the contribution is minor . These results

  6. Immediate vs delayed repair bond strength of a nanohybrid resin composite.

    PubMed

    El-Askary, Farid S; El-Banna, Ahmed H; van Noort, Richard

    2012-06-01

    To evaluate both the immediate and water-stored repair tensile bond strength (TBS) of a nanohybrid resin composite using different bonding protocols. One hundred sixty half hourglass-shaped slabs were prepared. Eighty half-slabs were wet ground immediately after light curing using high-speed abrasive burs, while the other half-slabs were stored in water for one month (delayed) and then wet ground for repair. Each set of the 80 repaired slabs was split into two groups to be tested for TBS after 24 h or 1 month of water storage. For all repaired slabs, either immediate or delayed, four bonding procedures were used involving wet and dry bonding with a 3-step etch-and-rinse adhesive with or without silane pretreatment. TBS tests were performed at a crosshead speed of 0.5 mm/min. To determine the cohesive strength of the resin composite itself, which served as the reference, additional whole slabs were prepared and tested in tension after a 24-h (n = 10) and a 1-month storage period (n = 10). Failure modes were evaluated using a stereomicroscope at 40X magnification. Three-way ANOVA was run to test the effect of water storage, testing time, bonding protocols, and their interactions on the repair TBS, which was given as a percentage of the reference values. For the immediate repair groups, the repair TBS ranged from 40% to 61.9% after 24-h storage and from 26% to 53.1% after 1-month water storage compared to the TBS of the whole slabs. For the delayed repair group, the repaired TBS ranged from 47.2% to 63.6% for the 24-h repairs and from 32.2% to 44.2% for the test groups stored in water for 1 month. Three-way ANOVA revealed that water storage had no significant effect on the repair TBS (p = 0.619). Both testing time and bonding protocols had a significant effect on the repair TBS (p = 0.001). The interactions between the independent variables (water storage, testing time, and bonding protocols) had no significant effect (p = 0.067). The repair bond strength was consistently and highly significantly less than the cohesive strength of the composite. A delay of 1 month before carrying out the repair had no effect on the bond strength, irrespective of the bonding procedure used. Silane treatment did not improve the repair bond strength. In all instances, except for the immediate wet bonding plus silane procedure and delayed dry bonding, the bond strength of the repairs significantly dropped after 1 month of storage in water.

  7. Fan tomography of the tropospheric water vapor for the calibration of the Ka band tracking of the Bepi-Colombo spacecraft (MORE experiment).

    NASA Astrophysics Data System (ADS)

    Barriot, Jean-Pierre; Serafini, Jonathan; Sichoix, Lydie

    2012-07-01

    The radiosciences Bepi-Colombo MORE experiment will use X/X, X/Ka and Ka/Ka band radio links to make accurate measurements of the spacecraft range and range rate. Tropospheric zenith wet delays range from 1.5 cm to 10 cm, with high variability (less than 1000 s) and will impair these accurate measurements. Conditions vary from summer (worse) to winter (better), from day (worse) to night (better). These wet delays cannot be estimated from ground weather measurements and alternative calibration methods should be used in order to cope with the MORE requirements (no more than 3 mm at 1000 s). Due to the Mercury orbit, MORE measurements will be performed by daylight and more frequently in summer than in winter (from Northern hemisphere). Two systems have been considered to calibrate this wet delay: Water Vapour Radiometers (WVRs) and GPS receivers. The Jet Propulsion Laboratory has developed a new class of WVRs reaching a 5 percent accuracy for the wet delay calibration (0.75 mm to 5 mm), but these WVRs are expensive to build and operate. GPS receivers are also routinely used for the calibration of data from NASA Deep Space probes, but several studies have shown that GPS receivers can give good calibration (through wet delay mapping functions) for long time variations, but are not accurate enough for short time variations (100 to 1000 s), and that WVRs must be used to efficiently calibrate the wet troposphere delays over such time spans. We think that such a calibration could be done by assimilating data from all the GNSS constellations (GPS, GLONASS, Galileo, Beidou and IRNSS) that will be available at the time of the Bepi-Colombo arrival at Mercury (2021), provided that the underlying physics of the turbulent atmosphere and evapotranspiration processes are properly taken into account at such time scales. This implies to do a tomographic image of the troposphere overlying each Deep Space tracking station at time scales of less than 1000 s. For this purpose, we have developed a full representation of the wet refractivity of the atmosphere over the ground station along a basis of 3D Zernike functions with time-variable coefficients. We detail the algorithm and the covariance functions derived from radiosoundings that are used to constraint the inverse imaging of the wet troposphere at the target time scales, and give examples of such imaging from GPS data only.

  8. 40 CFR 141.405 - Reporting and recordkeeping for ground water systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 23 2014-07-01 2014-07-01 false Reporting and recordkeeping for ground water systems. 141.405 Section 141.405 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Ground Water Rule § 141.405 Reporting and recordkeeping for ground...

  9. 40 CFR 141.401 - Sanitary surveys for ground water systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 23 2014-07-01 2014-07-01 false Sanitary surveys for ground water systems. 141.401 Section 141.401 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Ground Water Rule § 141.401 Sanitary surveys for ground water systems. (a)...

  10. Inter-comparison of hydro-climatic regimes across northern catchments: Synchronicity, resistance and resilience

    USGS Publications Warehouse

    Carey, S.K.; Tetzlaff, D.; Seibert, J.; Soulsby, C.; Buttle, J.; Laudon, H.; McDonnell, J.; McGuire, K.; Caissie, D.; Shanley, J.; Kennedy, M.; Devito, K.; Pomeroy, J.W.

    2010-01-01

    The higher mid-latitudes of the Northern Hemisphere are particularly sensitive to climate change as small differences in temperature determine frozen ground status, precipitation phase, and the magnitude and timing of snow accumulation and melt. An international inter-catchment comparison program, North-Watch, seeks to improve our understanding of the sensitivity of northern catchments to climate change by examining their hydrological and biogeochemical responses. The catchments are located in Sweden (Krycklan), Scotland (Mharcaidh, Girnock and Strontian), the United States (Sleepers River, Hubbard Brook and HJ Andrews) and Canada (Catamaran, Dorset and Wolf Creek). This briefing presents the initial stage of the North-Watch program, which focuses on how these catchments collect, store and release water and identify 'types' of hydro-climatic catchment response. At most sites, a 10-year data of daily precipitation, discharge and temperature were compiled and evaporation and storage were calculated. Inter-annual and seasonal patterns of hydrological processes were assessed via normalized fluxes and standard flow metrics. At the annual-scale, relations between temperature, precipitation and discharge were compared, highlighting the role of seasonality, wetness and snow/frozen ground. The seasonal pattern and synchronicity of fluxes at the monthly scale provided insight into system memory and the role of storage. We identified types of catchments that rapidly translate precipitation into runoff and others that more readily store water for delayed release. Synchronicity and variance of rainfall-runoff patterns were characterized by the coefficient of variation (cv) of monthly fluxes and correlation coefficients. Principal component analysis (PCA) revealed clustering among like catchments in terms of functioning, largely controlled by two components that (i) reflect temperature and precipitation gradients and the correlation of monthly precipitation and discharge and (ii) the seasonality of precipitation and storage. By advancing the ecological concepts of resistance and resilience for catchment functioning, results provided a conceptual framework for understanding susceptibility to hydrological change across northern catchments. ?? 2010 John Wiley & Sons, Ltd.

  11. A new zonation algorithm with parameter estimation using hydraulic head and subsidence observations.

    PubMed

    Zhang, Meijing; Burbey, Thomas J; Nunes, Vitor Dos Santos; Borggaard, Jeff

    2014-01-01

    Parameter estimation codes such as UCODE_2005 are becoming well-known tools in groundwater modeling investigations. These programs estimate important parameter values such as transmissivity (T) and aquifer storage values (Sa ) from known observations of hydraulic head, flow, or other physical quantities. One drawback inherent in these codes is that the parameter zones must be specified by the user. However, such knowledge is often unknown even if a detailed hydrogeological description is available. To overcome this deficiency, we present a discrete adjoint algorithm for identifying suitable zonations from hydraulic head and subsidence measurements, which are highly sensitive to both elastic (Sske) and inelastic (Sskv) skeletal specific storage coefficients. With the advent of interferometric synthetic aperture radar (InSAR), distributed spatial and temporal subsidence measurements can be obtained. A synthetic conceptual model containing seven transmissivity zones, one aquifer storage zone and three interbed zones for elastic and inelastic storage coefficients were developed to simulate drawdown and subsidence in an aquifer interbedded with clay that exhibits delayed drainage. Simulated delayed land subsidence and groundwater head data are assumed to be the observed measurements, to which the discrete adjoint algorithm is called to create approximate spatial zonations of T, Sske , and Sskv . UCODE-2005 is then used to obtain the final optimal parameter values. Calibration results indicate that the estimated zonations calculated from the discrete adjoint algorithm closely approximate the true parameter zonations. This automation algorithm reduces the bias established by the initial distribution of zones and provides a robust parameter zonation distribution. © 2013, National Ground Water Association.

  12. Flapping current sheet with superposed waves seen in space and on the ground

    NASA Astrophysics Data System (ADS)

    Wang, Guoqiang; Volwerk, Martin; Nakamura, Rumi; Boakes, Peter; Zhang, Tielong; Ge, Yasong; Yoshikawa, Akimasa; Baishev, Dmitry

    2015-04-01

    A wavy current sheet event observed on 15th of October 2004 between 1235 and 1300 UT has been studied by using Cluster and ground-based magnetometer data. Waves propagating from the tail centre to the duskside flank with a period ~30 s and wavelength ~1 RE, are superimposed on a flapping current sheet, accompanied with a bursty bulk flow (BBF). Three Pi2 pulsations, with onset at ~1236, ~1251 and ~1255 UT, respectively, are observed at the Tixie (TIK) station located near the foot-points of Cluster. The mechanism creating the Pi2 (period ~40 s) onset at ~1236 UT is unclear. The second Pi2 (period ~90 s, onset at ~1251 UT) is associated with a strong field-aligned current, which has a strong transverse component of the magnetic field, observed by Cluster with a time delay ~60 s. We suggest that it is caused by bouncing Alfvén waves between the northern and southern ionosphere which transport the field-aligned current. For the third Pi2 (period ~60 s) there is almost no damping at the first three periods. They occur in conjunction with periodic field-aligned currents one-on-one with 72s delay. We suggest that it is generated by these periodic field-aligned currents. We conclude that the strong field-aligned currents generated in the plasma sheet during flapping with superimposed higher frequency waves can drive Pi2 pulsations on the ground, and periodic field-aligned currents can even control the period of the Pi2s.

  13. Installation Restoration Program Management Plan

    DTIC Science & Technology

    1999-03-01

    Proving Ground Dugway Proving Ground White Sands Missile Range Yuma Proving Ground Aviation Missile Command Redstone Arsenal Letterkenny Army Depot...approved for Public Release DUC QUALITY INSPECTED 3 REPLY TO ATTENTION OF DEPARTMENT OF THE ARMY U.S. ARMY ENVIRONMENTAL CENTER ABERDEEN PROVING GROUND ...environmental documents. The TIC is located at the USAEC at Aberdeen Proving Ground , MD. If an installation or MACOM/MSC is not aware of

  14. Evaluation of the U.S. Geological Survey Ground-Water Data-Collection Program in Hawaii, 1992

    USGS Publications Warehouse

    Anthony, Stephen S.

    1997-01-01

    In 1992, the U.S. Geological Survey ground-water data-collection program in the State of Hawaii consisted of 188 wells distributed among the islands of Oahu, Kauai, Maui, Molokai, and Hawaii. Water-level and water-quality (temperature, specific conductance, and chloride concentration) data were collected from observation wells, deep monitoring wells that penetrate the zone of transition between freshwater and saltwater, free-flowing wells, and pumped wells. The objective of the program was to collect sufficient spatial and temporal data to define seasonal and long-term changes in ground-water levels and chloride concentrations induced by natural and human-made stresses for different climatic and hydrogeologic settings. Wells needed to meet this objective can be divided into two types of networks: (1) a water-management network to determine the response of ground-water flow systems to human-induced stresses, such as pumpage, and (2) a baseline network to determine the response of ground-water flow systems to natural stresses for different climatic and hydrogeologic settings. Maps showing the distribution and magnitude of pumpage and the distribution of proposed pumped wells are presented to identify areas in need of water-management networks. Wells in the 1992 U.S. Geological Survey ground-water data-collection program were classified as either water-management or baseline network wells. In addition, locations where additional water-management network wells are needed for water-level and water-quality data were identified.

  15. How Robotics Programs Influence Young Women's Career Choices: A Grounded Theory Model

    ERIC Educational Resources Information Center

    Craig, Cecilia Dosh-Bluhm

    2014-01-01

    The fields of engineering, computer science, and physics have a paucity of women despite decades of intervention by universities and organizations. Women's graduation rates in these fields continue to stagnate, posing a critical problem for society. This qualitative grounded theory (GT) study sought to understand how robotics programs influenced…

  16. Identifying Barriers in Implementing Outcomes-Based Assessment Program Review: A Grounded Theory Analysis

    ERIC Educational Resources Information Center

    Bresciani, Marilee J.

    2011-01-01

    The purpose of this grounded theory study was to identify the typical barriers encountered by faculty and administrators when implementing outcomes-based assessment program review. An analysis of interviews with faculty and administrators at nine institutions revealed a theory that faculty and administrators' promotion, tenure (if applicable),…

  17. 13 CFR 120.1425 - Grounds for enforcement actions-Intermediaries participating in the Microloan Program and NTAPs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Grounds for enforcement actions-Intermediaries participating in the Microloan Program and NTAPs. 120.1425 Section 120.1425 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Risk-Based Lender Oversight Enforcement Actions § 120...

  18. Electronic Portfolios in Teacher Education: Forging a Middle Ground

    ERIC Educational Resources Information Center

    Strudler, Neal; Wetzel, Keith

    2012-01-01

    At a time when implementation of electronic portfolios (EPs) is expanding, the issues of clarifying their purposes continue to plague teacher education programs. Are student-centered uses of EPs compatible with program assessment and accreditation efforts? Is this an either/or situation, or can a productive middle ground be forged? This article…

  19. 43 CFR 17.11 - Effect on other regulations; forms and instructions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Race, Color, or National Origin § 17.11 Effect on other regulations; forms and instructions. (a) Effect... on the grounds of race, color, or national origin under any program to which this regulation applies... grounds of race, color, or national origin in any program or situation to which this part is inapplicable...

  20. 43 CFR 17.11 - Effect on other regulations; forms and instructions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Race, Color, or National Origin § 17.11 Effect on other regulations; forms and instructions. (a) Effect... on the grounds of race, color, or national origin under any program to which this regulation applies... grounds of race, color, or national origin in any program or situation to which this part is inapplicable...

  1. 43 CFR 17.11 - Effect on other regulations; forms and instructions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Race, Color, or National Origin § 17.11 Effect on other regulations; forms and instructions. (a) Effect... on the grounds of race, color, or national origin under any program to which this regulation applies... grounds of race, color, or national origin in any program or situation to which this part is inapplicable...

  2. 43 CFR 17.11 - Effect on other regulations; forms and instructions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Race, Color, or National Origin § 17.11 Effect on other regulations; forms and instructions. (a) Effect... on the grounds of race, color, or national origin under any program to which this regulation applies... grounds of race, color, or national origin in any program or situation to which this part is inapplicable...

  3. 43 CFR 17.11 - Effect on other regulations; forms and instructions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Race, Color, or National Origin § 17.11 Effect on other regulations; forms and instructions. (a) Effect... on the grounds of race, color, or national origin under any program to which this regulation applies... grounds of race, color, or national origin in any program or situation to which this part is inapplicable...

  4. Watch Me Move: A Program For Parents of Young Children With Gross-Motor Delays.

    PubMed

    Natrasony, Candice; Teitelbaum, Debra

    2016-11-01

    Watch Me Move (WMM) is a 6-week parent education program for caregivers of children with gross-motor delays. The aims are to improve parent-child interaction in a gross-motor context, increase parents' knowledge of behavioral cues and gross-motor development, and decrease perceived parental stress. Forty mothers of children, 6 months to 3 years of age, with a gross-motor delay participated in a randomized control trial comparing parents who received the WMM program plus standard of care physiotherapy (n = 24) with parents whose children received standard of care physiotherapy (n = 16). Mothers who received the WMM program had significantly higher change scores on two subscales of the Nursing Child Assessment Teaching Scale (NCATS; i.e., cognitive growth fostering, and responsiveness to caregiver) and on the Parent Knowledge Questionnaire assessing knowledge of behavioral cues and gross-motor development. There were no significant group differences on the other four NCATS subscales (i.e., sensitivity to cues, response to child's distress, social emotional growth fostering, and clarity of cues) or the Parenting Stress Index. The addition of WMM to traditional physiotherapy improved aspects of mothers' ability to interact with their children and their knowledge of behavioral cues and gross-motor development.

  5. Disruption Tolerant Networking Flight Validation Experiment on NASA's EPOXI Mission

    NASA Technical Reports Server (NTRS)

    Wyatt, Jay; Burleigh, Scott; Jones, Ross; Torgerson, Leigh; Wissler, Steve

    2009-01-01

    In October and November of 2008, the Jet Propulsion Laboratory installed and tested essential elements of Delay/Disruption Tolerant Networking (DTN) technology on the Deep Impact spacecraft. This experiment, called Deep Impact Network Experiment (DINET), was performed in close cooperation with the EPOXI project which has responsibility for the spacecraft. During DINET some 300 images were transmitted from the JPL nodes to the spacecraft. Then they were automatically forwarded from the spacecraft back to the JPL nodes, exercising DTN's bundle origination, transmission, acquisition, dynamic route computation, congestion control, prioritization, custody transfer, and automatic retransmission procedures, both on the spacecraft and on the ground, over a period of 27 days. All transmitted bundles were successfully received, without corruption. The DINET experiment demonstrated DTN readiness for operational use in space missions. This activity was part of a larger NASA space DTN development program to mature DTN to flight readiness for a wide variety of mission types by the end of 2011. This paper describes the DTN protocols, the flight demo implementation, validation metrics which were created for the experiment, and validation results.

  6. "Fly-by-Wireless": A Revolution in Aerospace Vehicle Architecture for Instrumentation and Control

    NASA Technical Reports Server (NTRS)

    Studor, George

    2007-01-01

    Aerospace vehicle programs have always counted on the cables and connectors to provide power, grounding, data and time synchronization throughout a vehicle's life-cycle. Even with numerous improvements, wiring and connector problems and sensors continue to be key failure points, causing many hours of troubleshooting and replacement. Costly flight delays have been precipitated by the need to troubleshoot cables/connections, and/or repair a sensor. Wiring continues to be too expensive to remove once it is installed, even with the weight penalties. Miles of test instrumentation and low flight sensor wires still plague the aerospace industry. New technology options for data connectivity, processing and micro/nano manufacturing are making it possible to retrofit existing vehicles, like the Space Shuttle. New vehicles can now develop architectures that provide for and take advantage of alternatives to wired connectivity. This project motivates the aerospace industry and technology providers to establish: (1) A new emphasis for system engineering approaches to reduce cables and connectors. (2) Provisions for modularity and accessibility in the vehicle architecture. (3) A set of technologies that support alternatives to wired connectivity.

  7. A System for Photon-Counting Spectrophotometry of Prompt Optical Emission from Gamma-Ray Bursts

    NASA Astrophysics Data System (ADS)

    Vestrand, W. T.; Albright, K.; Casperson, D.; Fenimore, E.; Ho, C.; Priedhorsky, W.; White, R.; Wren, J.

    2003-04-01

    With the launch of HETE-2 and the coming launch of the Swift satellite, there will be many new opportunities to study the physics of the prompt optical emission with robotic ground-based telescopes. Time-resolved spectrophotometry of the rapidly varying optical emission is likely to be a rich area for discovery. We describe a program to apply state-of-the-art photon-counting imaging technology to the study of prompt optical emission from gamma-ray bursts. The Remote Ultra-Low Light Imaging (RULLI) project at Los Alamos National Laboratory has developed an imaging sensor which employs stacked microchannel plates and a crossed delay line readout with 200 picosecond photon timing to measure the time of arrival and positions for individual optical photons. RULLI detectors, when coupled with a transmission grating having 300 grooves/mm, can make photon-counting spectroscopic observations with spectral resolution that is an order of magnitude greater and temporal resolution three orders of magnitude greater than the most capable photon-counting imaging detectors that have been used for optical astronomy.

  8. The Biggest Mover: Empowering Students with Intellectual and Developmental Delays and Physical Challenges

    ERIC Educational Resources Information Center

    Brown, Michelle J.

    2018-01-01

    The Biggest Mover Program, an educational program to improve daily exercise and healthy eating was developed to address the learning needs of students with intellectual and developmental disabilities and physical challenges. The program was part of a three-part program to improve the knowledge of students, staff, and teachers through the use of…

  9. SCL: An off-the-shelf system for spacecraft control

    NASA Astrophysics Data System (ADS)

    Buckley, Brian; Vangaasbeck, James

    1994-11-01

    In this age of shrinking military, civil, and commercial space budgets, an off-the-shelf solution is needed to provide a multimission approach to spacecraft control. A standard operational interface which can be applied to multiple spacecraft allows a common approach to ground and space operations. A trend for many space programs has been to reduce operational staff by applying autonomy to the spacecraft and to the ground stations. The Spacecraft Command Language (SCL) system developed by Interface and Control Systems, Inc. (ICS) provides an off-the-shelf solution for spacecraft operations. The SCL system is designed to provide a hyper-scripting interface which remains standard from program to program. The spacecraft and ground station hardware specifics are isolated to provide the maximum amount of portability from system to system. Uplink and downlink interfaces are also isolated to allow the system to perform independent of the communications protocols chosen. The SCL system can be used for both the ground stations and the spacecraft, or as a value added package for existing ground station environments. The SCL system provides an expanded stored commanding capability as well as a rule-based expert system on-board. The expert system allows reactive control on-board the spacecraft for functions such as electrical power systems (EPS), thermal control, etc. which have traditionally been performed on the ground. The SCL rule and scripting capability share a common syntax allowing control of scripts from rules and rules from scripts. Rather than telemeter over sampled data to the ground, the SCL system maintains a database on-board which is available for interrogation by the scripts and rules. The SCL knowledge base is constructed on the ground and uploaded to the spacecraft. The SCL system follows an open-systems approach allowing other tasks to communicate with SCL on the ground and in space. The SCL system was used on the Clementine program (launched January 25, 1994) and is required to have bidirectional communications with the guidance, navigation, and control (GNC) algorithms which were written as another task. Sequencing of the spacecraft maneuvers are handled by SCL, but the low-level thruster pulse commands are handled by the GNC software. Attitude information is reported back as telemetry, allowing the SCL expert system to inference on the changing data. The Clementine SCL flight software was largely reused from another Naval Center for Space Technology (NCST) satellite program.

  10. SCL: An off-the-shelf system for spacecraft control

    NASA Technical Reports Server (NTRS)

    Buckley, Brian; Vangaasbeck, James

    1994-01-01

    In this age of shrinking military, civil, and commercial space budgets, an off-the-shelf solution is needed to provide a multimission approach to spacecraft control. A standard operational interface which can be applied to multiple spacecraft allows a common approach to ground and space operations. A trend for many space programs has been to reduce operational staff by applying autonomy to the spacecraft and to the ground stations. The Spacecraft Command Language (SCL) system developed by Interface and Control Systems, Inc. (ICS) provides an off-the-shelf solution for spacecraft operations. The SCL system is designed to provide a hyper-scripting interface which remains standard from program to program. The spacecraft and ground station hardware specifics are isolated to provide the maximum amount of portability from system to system. Uplink and downlink interfaces are also isolated to allow the system to perform independent of the communications protocols chosen. The SCL system can be used for both the ground stations and the spacecraft, or as a value added package for existing ground station environments. The SCL system provides an expanded stored commanding capability as well as a rule-based expert system on-board. The expert system allows reactive control on-board the spacecraft for functions such as electrical power systems (EPS), thermal control, etc. which have traditionally been performed on the ground. The SCL rule and scripting capability share a common syntax allowing control of scripts from rules and rules from scripts. Rather than telemeter over sampled data to the ground, the SCL system maintains a database on-board which is available for interrogation by the scripts and rules. The SCL knowledge base is constructed on the ground and uploaded to the spacecraft. The SCL system follows an open-systems approach allowing other tasks to communicate with SCL on the ground and in space. The SCL system was used on the Clementine program (launched January 25, 1994) and is required to have bidirectional communications with the guidance, navigation, and control (GNC) algorithms which were written as another task. Sequencing of the spacecraft maneuvers are handled by SCL, but the low-level thruster pulse commands are handled by the GNC software. Attitude information is reported back as telemetry, allowing the SCL expert system to inference on the changing data. The Clementine SCL flight software was largely reused from another Naval Center for Space Technology (NCST) satellite program. This paper details the SCL architecture and how an off-the-shelf solution makes sense for multimission spacecraft programs. The Clementine mission will be used as a case study in the application of the SCL to a 'fast track' program. The benefits of such a system in a 'better, cheaper, faster' climate will be discussed.

  11. Vocal effort modulates the motor planning of short speech structures

    NASA Astrophysics Data System (ADS)

    Taitz, Alan; Shalom, Diego E.; Trevisan, Marcos A.

    2018-05-01

    Speech requires programming the sequence of vocal gestures that produce the sounds of words. Here we explored the timing of this program by asking our participants to pronounce, as quickly as possible, a sequence of consonant-consonant-vowel (CCV) structures appearing on screen. We measured the delay between visual presentation and voice onset. In the case of plosive consonants, produced by sharp and well defined movements of the vocal tract, we found that delays are positively correlated with the duration of the transition between consonants. We then used a battery of statistical tests and mathematical vocal models to show that delays reflect the motor planning of CCVs and transitions are proxy indicators of the vocal effort needed to produce them. These results support that the effort required to produce the sequence of movements of a vocal gesture modulates the onset of the motor plan.

  12. The Joint Winter Runway Friction Measurement Program: NASA Perspective

    NASA Technical Reports Server (NTRS)

    Yager, Thomas J.

    1996-01-01

    Some background information is given together with the scope and objectives of the 5-year, Joint National Aeronautics & Space Administration (NASA)/Transport Canada (TC)/Federal Aviation Administration (FAA) Winter Runway Friction Measurement Program. The range of the test equipment, the selected test sites and a tentative test program schedule are described. NASA considers the success of this program critical in terms of insuring adequate ground handling performance capability in adverse weather conditions for future aircraft being designed and developed as well as improving the safety of current aircraft ground operations.

  13. Annual Report to the NASA Administrator by the Aerospace Safety Advisory Panel on the Space Shuttle Program. Part 2: Summary of Information Developed in the Panel's Fact-Finding Activities

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The panel focused its attention on those areas that are considered most significant for flight success and safety. Elements required for the Approach and Landing Test Program, the Orbital Flight Test Program, and those management systems and their implementation which directly affect safety, reliability, and quality control, were investigated. Ground facilities and the training programs for the ground and flight crews were studied. Of special interest was the orbiter thermal protection subsystems.

  14. Thrust Chamber Modeling Using Navier-Stokes Equations: Code Documentation and Listings. Volume 2

    NASA Technical Reports Server (NTRS)

    Daley, P. L.; Owens, S. F.

    1988-01-01

    A copy of the PHOENICS input files and FORTRAN code developed for the modeling of thrust chambers is given. These copies are contained in the Appendices. The listings are contained in Appendices A through E. Appendix A describes the input statements relevant to thrust chamber modeling as well as the FORTRAN code developed for the Satellite program. Appendix B describes the FORTRAN code developed for the Ground program. Appendices C through E contain copies of the Q1 (input) file, the Satellite program, and the Ground program respectively.

  15. Estimates of ground-water recharge based on streamflow-hydrograph methods: Pennsylvania

    USGS Publications Warehouse

    Risser, Dennis W.; Conger, Randall W.; Ulrich, James E.; Asmussen, Michael P.

    2005-01-01

    This study, completed by the U.S. Geological Survey (USGS) in cooperation with the Pennsylvania Department of Conservation and Natural Resources, Bureau of Topographic and Geologic Survey (T&GS), provides estimates of ground-water recharge for watersheds throughout Pennsylvania computed by use of two automated streamflow-hydrograph-analysis methods--PART and RORA. The PART computer program uses a hydrograph-separation technique to divide the streamflow hydrograph into components of direct runoff and base flow. Base flow can be a useful approximation of recharge if losses and interbasin transfers of ground water are minimal. The RORA computer program uses a recession-curve displacement technique to estimate ground-water recharge from each storm period indicated on the streamflow hydrograph. Recharge estimates were made using streamflow records collected during 1885-2001 from 197 active and inactive streamflow-gaging stations in Pennsylvania where streamflow is relatively unaffected by regulation. Estimates of mean-annual recharge in Pennsylvania computed by the use of PART ranged from 5.8 to 26.6 inches; estimates from RORA ranged from 7.7 to 29.3 inches. Estimates from the RORA program were about 2 inches greater than those derived from the PART program. Mean-monthly recharge was computed from the RORA program and was reported as a percentage of mean-annual recharge. On the basis of this analysis, the major ground-water recharge period in Pennsylvania typically is November through May; the greatest monthly recharge typically occurs in March.

  16. Global Precipitation Measurement (GPM) Ground Validation: Plans and Preparations

    NASA Technical Reports Server (NTRS)

    Schwaller, M.; Bidwell, S.; Durning, F. J.; Smith, E.

    2004-01-01

    The Global Precipitation Measurement (GPM) program is an international partnership led by the National Aeronautics and Space Administration (NASA) and the Japan Aerospace Exploration Agency (JAXA). GPM will improve climate, weather, and hydro-meteorological forecasts through more frequent and more accurate measurement of precipitation across the globe. This paper describes the concept, the planning, and the preparations for Ground Validation within the GPM program. Ground Validation (GV) plays an important role in the program by investigating and quantitatively assessing the errors within the satellite retrievals. These quantitative estimates of retrieval errors will assist the scientific community by bounding the errors within their research products. The two fundamental requirements of the GPM Ground Validation program are: (1) error characterization of the precipitation retrievals and (2) continual improvement of the satellite retrieval algorithms. These two driving requirements determine the measurements, instrumentation, and location for ground observations. This paper outlines GV plans for estimating the systematic and random components of retrieval error and for characterizing the spatial p d temporal structure of the error and plans for algorithm improvement in which error models are developed and experimentally explored to uncover the physical causes of errors within the retrievals. This paper discusses NASA locations for GV measurements as well as anticipated locations from international GPM partners. NASA's primary locations for validation measurements are an oceanic site at Kwajalein Atoll in the Republic of the Marshall Islands and a continental site in north-central Oklahoma at the U.S. Department of Energy's Atmospheric Radiation Measurement Program site.

  17. 78 FR 45513 - Privacy Act of 1974; Computer Matching Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-29

    ...; Computer Matching Program AGENCY: Defense Manpower Data Center (DMDC), DoD. ACTION: Notice of a Computer... individual's privacy, and would result in additional delay in determining eligibility and, if applicable, the... Defense. NOTICE OF A COMPUTER MATCHING PROGRAM AMONG THE DEFENSE MANPOWER DATA CENTER, THE DEPARTMENT OF...

  18. Coherent control of the formation of cold heteronuclear molecules by photoassociation

    NASA Astrophysics Data System (ADS)

    de Lima, Emanuel F.

    2017-01-01

    We consider the formation of cold diatomic molecules in the electronic ground state by photoassociation of atoms of dissimilar species. A combination of two transition pathways from the free colliding pair of atoms to a bound vibrational level of the electronic molecular ground state is envisioned. The first pathway consists of a pump-dump scheme with two time-delayed laser pulses in the near-infrared frequency domain. The pump pulse drives the transition to a bound vibrational level of an excited electronic state, while the dump pulse transfers the population to a bound vibrational level of the electronic ground state. The second pathway takes advantage of the existing permanent dipole moment and employs a single pulse in the far-infrared domain to drive the transition from the unbound atoms directly to a bound vibrational level in the electronic ground state. We show that this scheme offers the possibility to coherently control the photoassociation yield by manipulating the relative phase and timing of the pulses. The photoassociation mechanism is illustrated for the formation of cold LiCs molecules.

  19. AMO EXPRESS: A Command and Control Experiment for Crew Autonomy

    NASA Technical Reports Server (NTRS)

    Stetson, Howard K.; Frank, Jeremy; Cornelius, Randy; Haddock, Angie; Wang, Lui; Garner, Larry

    2015-01-01

    NASA is investigating a range of future human spaceflight missions, including both Mars-distance and Near Earth Object (NEO) targets. Of significant importance for these missions is the balance between crew autonomy and vehicle automation. As distance from Earth results in increasing communication delays, future crews need both the capability and authority to independently make decisions. However, small crews cannot take on all functions performed by ground today, and so vehicles must be more automated to reduce the crew workload for such missions. NASA's Advanced Exploration Systems Program funded Autonomous Mission Operations (AMO) project conducted an autonomous command and control demonstration of intelligent procedures to automatically initialize a rack onboard the International Space Station (ISS) with power and thermal interfaces, and involving core and payload command and telemetry processing, without support from ground controllers. This autonomous operations capability is enabling in scenarios such as a crew medical emergency, and representative of other spacecraft autonomy challenges. The experiment was conducted using the Expedite the Processing of Experiments for Space Station (EXPRESS) rack 7, which was located in the Port 2 location within the U.S Laboratory onboard the International Space Station (ISS). Activation and deactivation of this facility is time consuming and operationally intensive, requiring coordination of three flight control positions, 47 nominal steps, 57 commands, 276 telemetry checks, and coordination of multiple ISS systems (both core and payload). The autonomous operations concept includes a reduction of the amount of data a crew operator is required to verify during activation or de-activation, as well as integration of procedure execution status and relevant data in a single integrated display. During execution, the auto-procedures provide a step-by-step messaging paradigm and a high level status upon termination. This messaging and high level status is the only data generated for operator display. To enhance situational awareness of the operator, the Web-based Procedure Display (WebPD) provides a novel approach to the issues of procedure display and execution tracking. For this demonstration, the procedure was initiated and monitored from the ground. As the Timeliner sequences executed, their high level execution status was transmitted to ground, for WebPD consumption.

  20. Ares I-X Ground Diagnostic Prototype

    NASA Technical Reports Server (NTRS)

    Schwabacher, Mark; Martin, Rodney; Waterman, Robert; Oostdyk, Rebecca; Ossenfort, John; Matthews, Bryan

    2010-01-01

    Automating prelaunch diagnostics for launch vehicles offers three potential benefits. First, it potentially improves safety by detecting faults that might otherwise have been missed so that they can be corrected before launch. Second, it potentially reduces launch delays by more quickly diagnosing the cause of anomalies that occur during prelaunch processing. Reducing launch delays will be critical to the success of NASA's planned future missions that require in-orbit rendezvous. Third, it potentially reduces costs by reducing both launch delays and the number of people needed to monitor the prelaunch process. NASA is currently developing the Ares I launch vehicle to bring the Orion capsule and its crew of four astronauts to low-earth orbit on their way to the moon. Ares I-X will be the first unmanned test flight of Ares I. It is scheduled to launch on October 27, 2009. The Ares I-X Ground Diagnostic Prototype is a prototype ground diagnostic system that will provide anomaly detection, fault detection, fault isolation, and diagnostics for the Ares I-X first-stage thrust vector control (TVC) and for the associated ground hydraulics while it is in the Vehicle Assembly Building (VAB) at John F. Kennedy Space Center (KSC) and on the launch pad. It will serve as a prototype for a future operational ground diagnostic system for Ares I. The prototype combines three existing diagnostic tools. The first tool, TEAMS (Testability Engineering and Maintenance System), is a model-based tool that is commercially produced by Qualtech Systems, Inc. It uses a qualitative model of failure propagation to perform fault isolation and diagnostics. We adapted an existing TEAMS model of the TVC to use for diagnostics and developed a TEAMS model of the ground hydraulics. The second tool, Spacecraft Health Inference Engine (SHINE), is a rule-based expert system developed at the NASA Jet Propulsion Laboratory. We developed SHINE rules for fault detection and mode identification. The prototype uses the outputs of SHINE as inputs to TEAMS. The third tool, the Inductive Monitoring System (IMS), is an anomaly detection tool developed at NASA Ames Research Center and is currently used to monitor the International Space Station Control Moment Gyroscopes. IMS automatically "learns" a model of historical nominal data in the form of a set of clusters and signals an alarm when new data fails to match this model. IMS offers the potential to detect faults that have not been modeled. The three tools have been integrated and deployed to Hangar AE at KSC where they interface with live data from the Ares I-X vehicle and from the ground hydraulics. The outputs of the tools are displayed on a console in Hangar AE, one of the locations from which the Ares I-X launch will be monitored. The full paper will describe how the prototype performed before the launch. It will include an analysis of the prototype's accuracy, including false-positive rates, false-negative rates, and receiver operating characteristics (ROC) curves. It will also include a description of the prototype's computational requirements, including CPU usage, main memory usage, and disk usage. If the prototype detects any faults during the prelaunch period then the paper will include a description of those faults. Similarly, if the prototype has any false alarms then the paper will describe them and will attempt to explain their causes.

  1. Increase of larger-sized islets in C57/black mice during the long-term space flight.

    NASA Astrophysics Data System (ADS)

    Proshchina, Alexandra; Krivova, Yulia

    Alteration of metabolism has been suggested as a major limiting factor to long-term space flight. Metabolic studies during simulated microgravity and true microgravity in flight have shown changes in blood glucose and in insulin and glucagon concentrations. It was suggested that endocrine pancreas undergoes subclinical diabetogenic changes such as alterations in insulin secretion, insulin sensitivity, glucose tolerance in microgravity conditions. In this study, we analyzed pancreata of the C57 black mice in order to estimate the effects of the long-term space flight. 5 mice, which were flown on the “Bion-M1” satellite for 30 days, were served for this study (flight group). Five animals were used as the vivarium ground control and five mice as the delayed synchronous ground control. The mice from synchronous control were put into container, similar to that one of the flight group for 30 days. Interestingly, the mean body weight of researched animals was higher in the flight group than in two control groups. Body weight in synchronous ground control group was higher than in vivarium control. From each mouse, the splenic part of the pancreas was removed and immediately fixed in 4% formaldehyde. Samples were embedded in paraffin, and 10 mcm serial sections were prepared. Double immunohistochemical staining with anti-insulin(Sigma,USA) and anti-glucagon (Thermo Fisher Scientific, USA) antibodies were performed. Signals were visualized using the MultiVision Polymer Detection System (Thermo Fisher Scientific, USA). Stained sections were photographed, using a 10 x objective and morphometrical parameters were examined. The size of each islet in ten non-overlapping observation fields in pancreatic sections of each mouse was measured using Image J software and analyzed. A software statistical package was used (Statistica 6.0, Statsoft Inc., Tusla, USA). A nonparametric tests (Kruskal -Wallis and Mann-Whitney tests) were used, because the islets number in the examined groups are of unequal size. The P-value was considered significant if less than 0.05. The islets in all three groups have a typical for murine pancreas architecture. The insulin-containing cells occupied the central position in pancreatic islets and the glucagon-containing cells were localized at the periphery. Histomorphometric analyses revealed significant increase of islets size in flight group compared with vivarium ground control. Moreover, the islets in group of the delayed synchronous ground control were significant larger then in group of vivarium control. No significant differences were found in islet size between flight and delayed synchronous ground control groups, but analyses indicated the increase of larger-sized islets in mice of flight group compared with synchronous control. Thus the mean islets size correlated with the body weight. The literature data indicates that similar changes are also observed in mice under conditions of an increased demand for insulin such as pregnancy, obesity, diabetes etc. According to the literature data, the researches of activity of pancreas have shown the increase of pancreatic hormones (insulin and C-peptide) in blood of astronauts in the early period after completion of space flights of various durations. In our study, the increase of islets size occurred not only in mice from flight group, but also in synchronous ground control. For this group, the live conditions imitated those of flight group without the factors of spaceflight such as microgravity. Therefore, we supposed that the hypokinesia play an important role in alteration of islets size. Thus, our data confirms the hypothesis of association microgravity and its experimental paradigms with manifestations similar to those of physical inactivity and diabetes.

  2. 31 CFR 205.17 - Are funds transfers delayed by automated payment systems restrictions based on the size and...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... automated payment systems restrictions based on the size and timing of the drawdown request subject to this... EFFICIENT FEDERAL-STATE FUNDS TRANSFERS Rules Applicable to Federal Assistance Programs Included in a Treasury-State Agreement § 205.17 Are funds transfers delayed by automated payment systems restrictions...

  3. Effects of Weighted Vests on the Engagement of Children with Developmental Delays and Autism

    ERIC Educational Resources Information Center

    Reichow, Brian; Barton, Erin E.; Sewell, Joanna Neely; Good, Leslie; Wolery, Mark

    2010-01-01

    The use of weighted vests for children with autism spectrum disorders and developmental disabilities is a common practice as part of sensory integration therapy programs. The purpose of the current investigation was to extend the research on the use of weighted vests for children with autism and developmental delays in a methodologically rigorous…

  4. Effects of Vocabulary Instruction Using Constant Time Delay on Expository Reading of Young Adults with Intellectual Disability

    ERIC Educational Resources Information Center

    Hua, Youjia; Woods-Groves, Suzanne; Kaldenberg, Erica R.; Scheidecker, Bethany J.

    2013-01-01

    We investigated the effectiveness of using constant time delay (CTD) with young adults with intellectual disability on their vocabulary acquisition and retention, as well as expository reading comprehension. Four learners, ages 19 to 21 years, from a postsecondary education program for individuals with disabilities participated in the study.…

  5. Performance of the high-resolution atmospheric model HRRR-AK for correcting geodetic observations from spaceborne radars

    PubMed Central

    Gong, W; Meyer, F J; Webley, P; Morton, D

    2013-01-01

    [1] Atmospheric phase delays are considered to be one of the main performance limitations for high-quality satellite radar techniques, especially when applied to ground deformation monitoring. Numerical weather prediction (NWP) models are widely seen as a promising tool for the mitigation of atmospheric delays as they can provide knowledge of the atmospheric conditions at the time of Synthetic Aperture Radar data acquisition. However, a thorough statistical analysis of the performance of using NWP production in radar signal correction is missing to date. This study provides a quantitative analysis of the accuracy in using operational NWP products for signal delay correction in satellite radar geodetic remote sensing. The study focuses on the temperate, subarctic, and Arctic climate regions due to a prevalence of relevant geophysical signals in these areas. In this study, the operational High Resolution Rapid Refresh over the Alaska region (HRRR-AK) model is used and evaluated. Five test sites were selected over Alaska (AK), USA, covering a wide range of climatic regimes that are commonly encountered in high-latitude regions. The performance of the HRRR-AK NWP model for correcting absolute atmospheric range delays of radar signals is assessed by comparing to radiosonde observations. The average estimation accuracy for the one-way zenith total atmospheric delay from 24 h simulations was calculated to be better than ∼14 mm. This suggests that the HRRR-AK operational products are a good data source for spaceborne geodetic radar observations atmospheric delay correction, if the geophysical signal to be observed is larger than 20 mm. PMID:25973360

  6. GROUND WATER ISSUE: DESIGN GUIDELINES FOR CONVENTIONAL PUMP-AND-TREAT SySTEMS

    EPA Science Inventory

    Containment and cleanup of contaminated ground water are among the primary objectives of the CERCLA (Comprehensive Environmental Response, Compensation, and Liability Act; also known as Superfund) and RCRA (Resource Conservation and Recovery Act) remediation programs. Ground-...

  7. The Kill Date as a Management Tool for Cover Cropping Success

    PubMed Central

    Alonso-Ayuso, María; Gabriel, José Luis; Quemada, Miguel

    2014-01-01

    Integrating cover crops (CC) in rotations provides multiple ecological services, but it must be ensured that management does not increase pre-emptive competition with the subsequent crop. This experiment was conducted to study the effect of kill date on: (i) CC growth and N content; (ii) the chemical composition of residues; (iii) soil inorganic N and potentially mineralizable N; and (iv) soil water content. Treatments were fallow and a CC mixture of barley (Hordeum vulgare L.) and vetch (Vicia sativa L.) sown in October and killed on two different dates in spring. Above-ground biomass and chemical composition of CC were determined at harvest, and ground cover was monitored based on digital image analysis. Soil mineral N was determined before sowing and after killing the CC, and potentially mineralizable N was measured by aerobic incubation at the end of the experiment. Soil water content was monitored daily to a depth of 1.1 m using capacitance sensors. Under the present conditions of high N availability, delaying kill date increased barley above-ground biomass and N uptake from deep soil layers; little differences were observed in vetch. Postponing kill date increased the C/N ratio and the fiber content of plant residues. Ground cover reached >80% by the first kill date (∼1250°C days). Kill date was a means to control soil inorganic N by balancing the N retained in the residue and soil, and showed promise for mitigating N losses. The early kill date decreased the risk of water and N pre-emptive competition by reducing soil depletion, preserving rain harvested between kill dates and allowing more time for N release in spring. The soil potentially mineralizable N was enhanced by the CC and kill date delay. Therefore kill date is a crucial management variable for maximizing the CC benefits in agricultural systems. PMID:25296333

  8. Oak bark allometry and fire survival strategies in the Chihuahuan desert Sky Islands, Texas, USA.

    PubMed

    Schwilk, Dylan W; Gaetani, Maria S; Poulos, Helen M

    2013-01-01

    Trees may survive fire through persistence of above or below ground structures. Investment in bark aids in above-ground survival while investment in carbohydrate storage aids in recovery through resprouting and is especially important following above-ground tissue loss. We investigated bark allocation and carbohydrate investment in eight common oak (Quercus) species of Sky Island mountain ranges in west Texas. We hypothesized that relative investment in bark and carbohydrates changes with tree age and with fire regime: We predicted delayed investment in bark (positive allometry) and early investment in carbohydrates (negative allometry) under lower frequency, high severity fire regimes found in wetter microclimates. Common oaks of the Texas Trans-Pecos region (Quercus emoryi, Q. gambelii, Q. gravesii, Q. grisea, Q. hypoleucoides, Q. muehlenbergii, and Q. pungens) were sampled in three mountain ranges with historically mixed fire regimes: the Chisos Mountains, the Davis Mountains and the Guadalupe Mountains. Bark thickness was measured on individuals representing the full span of sizes found. Carbohydrate concentration in taproots was measured after initial leaf flush. Bark thickness was compared to bole diameter and allometries were analyzed using major axis regression on log-transformed measurements. We found that bark allocation strategies varied among species that can co-occur but have different habitat preferences. Investment patterns in bark were related to soil moisture preference and drought tolerance and, by proxy, to expected fire regime. Dry site species had shallower allometries with allometric coefficients ranging from less than one (negative allometry) to near one (isometric investment). Wet site species, on the other hand, had larger allometric coefficients, indicating delayed investment to defense. Contrary to our expectation, root carbohydrate concentrations were similar across all species and sizes, suggesting that any differences in below ground storage are likely to be in total volume of storage tissue rather than in carbohydrate concentration.

  9. Oak Bark Allometry and Fire Survival Strategies in the Chihuahuan Desert Sky Islands, Texas, USA

    PubMed Central

    Schwilk, Dylan W.; Gaetani, Maria S.; Poulos, Helen M.

    2013-01-01

    Trees may survive fire through persistence of above or below ground structures. Investment in bark aids in above-ground survival while investment in carbohydrate storage aids in recovery through resprouting and is especially important following above-ground tissue loss. We investigated bark allocation and carbohydrate investment in eight common oak (Quercus) species of Sky Island mountain ranges in west Texas. We hypothesized that relative investment in bark and carbohydrates changes with tree age and with fire regime: We predicted delayed investment in bark (positive allometry) and early investment in carbohydrates (negative allometry) under lower frequency, high severity fire regimes found in wetter microclimates. Common oaks of the Texas Trans-Pecos region (Quercus emoryi, Q. gambelii, Q. gravesii, Q. grisea, Q. hypoleucoides, Q. muehlenbergii, and Q. pungens) were sampled in three mountain ranges with historically mixed fire regimes: the Chisos Mountains, the Davis Mountains and the Guadalupe Mountains. Bark thickness was measured on individuals representing the full span of sizes found. Carbohydrate concentration in taproots was measured after initial leaf flush. Bark thickness was compared to bole diameter and allometries were analyzed using major axis regression on log-transformed measurements. We found that bark allocation strategies varied among species that can co-occur but have different habitat preferences. Investment patterns in bark were related to soil moisture preference and drought tolerance and, by proxy, to expected fire regime. Dry site species had shallower allometries with allometric coefficients ranging from less than one (negative allometry) to near one (isometric investment). Wet site species, on the other hand, had larger allometric coefficients, indicating delayed investment to defense. Contrary to our expectation, root carbohydrate concentrations were similar across all species and sizes, suggesting that any differences in below ground storage are likely to be in total volume of storage tissue rather than in carbohydrate concentration. PMID:24244469

  10. NASA's Microgravity Science Program

    NASA Technical Reports Server (NTRS)

    Salzman, Jack A.

    1994-01-01

    Since the late 1980s, the NASA Microgravity Science Program has implemented a systematic effort to expand microgravity research. In 1992, 114 new investigators were selected to enter the program and more US microgravity experiments were conducted in space than in all the years combined since Skylab (1973-74). The use of NASA Research Announcements (NRA's) to solicit research proposals has proven to be highly successful in building a strong base of high-quality peer-reviewed science in both the ground-based and flight experiment elements of the program. The ground-based part of the program provides facilities for low gravity experiments including drop towers and aircraft for making parabolic flights. Program policy is that investigations should not proceed to the flight phase until all ground-based investigative capabilities have been exhausted. In the space experiments program, the greatest increase in flight opportunities has been achieved through dedicated or primary payload Shuttle missions. These missions will continue to be augmented by both mid-deck and GAS-Can accommodated experiments. A US-Russian cooperative flight program envisioned for 1995-97 will provide opportunities for more microgravity research as well as technology demonstration and systems validation efforts important for preparing for experiment operations on the Space Station.

  11. JPL/USC GAIM: Validating COSMIC and Ground-Based GPS Assimilation Results to Estimate Ionospheric Electron Densities

    NASA Astrophysics Data System (ADS)

    Komjathy, A.; Wilson, B.; Akopian, V.; Pi, X.; Mannucci, A.; Wang, C.

    2008-12-01

    We seem to be in the midst of a revolution in ionospheric remote sensing driven by the abundance of ground and space-based GPS receivers, new UV remote sensing satellites, and the advent of data assimilation techniques for space weather. In particular, the COSMIC 6-satellite constellation was launched in April 2006. COSMIC now provides unprecedented global coverage of GPS occultations measurements, each of which yields electron density information with unprecedented ~1 km vertical resolution. Calibrated measurements of ionospheric delay (total electron content or TEC) suitable for input into assimilation models is currently made available in near real-time (NRT) from the COSMIC with a latency of 30 to 120 minutes. The University of Southern California (USC) and the Jet Propulsion Laboratory (JPL) have jointly developed a real-time Global Assimilative Ionospheric Model (GAIM) to monitor space weather, study storm effects, and provide ionospheric calibration for DoD customers and NASA flight projects. JPL/USC GAIM is a physics- based 3D data assimilation model that uses both 4DVAR and Kalman filter techniques to solve for the ion and electron density state and key drivers such as equatorial electrodynamics, neutral winds, and production terms. Daily (delayed) GAIM runs can accept as input ground GPS TEC data from 1200+ sites, occultation links from CHAMP, SAC-C, and the COSMIC constellation, UV limb and nadir scans from the TIMED and DMSP satellites, and in situ data from a variety of satellites (DMSP and C/NOFS). Real-Time GAIM (RTGAIM) ingests multiple data sources in real time, updates the 3D electron density grid every 5 minutes, and solves for improved drivers every 1-2 hours. Since our forward physics model and the adjoint model were expressly designed for data assimilation and computational efficiency, all of this can be accomplished on a single dual- processor Unix workstation. Customers are currently evaluating the accuracy of JPL/USC GAIM 'nowcasts' for ray tracing applications and trans-ionospheric path delay calibration. In the presentation, we will discuss the expected impact of NRT COSMIC occultation and NRT ground-based measurements and present validation results for ingest of COSMIC data into GAIM using measurements from World Days. We will quality check our COSMIC-derived products by comparing Abel profiles and JPL- processed results. Furthermore, we will validate GAIM assimilation results using Incoherent Scatter Radar measurements from Arecibo, Jicamarca and Millstone Hill datasets. We will conclude by characterizing the improved electron density states using dual-frequency altimeter-derived Jason vertical TEC measurements.

  12. Effectiveness in Delaying the Initiation of Sexual Intercourse of Girls Aged 12-14: Two Components of the Girls Incorporated Preventing Adolescent Pregnancy Program.

    ERIC Educational Resources Information Center

    Postrado, Leticia T.; Nicholson, Heather Johnston

    1992-01-01

    Evaluates effectiveness of the Girls Incorporated Preventing Adolescent Pregnancy Program, concentrating on effectiveness of the Will Power/Won't Power social skills development program and the Growing Together parent-daughter communication program. Surveys of 412 girls aged 12 to 14 years indicate the effectiveness of these programs in delaying…

  13. Zero-Extra-Dose PET Delayed Imaging with Data-Driven Attenuation Correction Estimation.

    PubMed

    Pang, Lifang; Zhu, Wentao; Dong, Yun; Lv, Yang; Shi, Hongcheng

    2018-05-08

    Delayed positron emission tomography (PET) imaging may improve sensitivity and specificity in lesion detection. We proposed a PET data-driven method to estimate the attenuation map (AM) for the delayed scan without an additional x-ray computed tomography (CT). An emission-attenuation-scatter joint estimation framework was developed. Several practical issues for clinical datasets were addressed. Particularly, the unknown scatter correction was incorporated in the joint estimation algorithm. The scaling problem was solved using prior information from the early CT scan. Fourteen patient datasets were added to evaluate the method. These patients went through two separate PET/CT scans. The delayed CT-based AM served as ground truth for the delayed scan. Standard uptake values (SUVmean and SUVmax) of lesion and normal tissue regions of interests (ROIs) in the early and delayed phase and the respective %DSUV (percentage change of SUVmean at two different time points) were analyzed, all with estimated and the true AM. Three radiologists participated in lesion detection tasks with images reconstructed with both AMs and rated scores for detectability. The mean relative difference of SUVmean in lesion and normal liver tissue were 3.30 and 6.69 %. The average lesion-to-background contrast (detectability) with delayed PET images using CT AM was 60 % higher than that of the earlier PET image, and was 64 % higher when using the data-based AM. %DSUV for lesions and liver backgrounds with CT-based AM were - 0.058 ± 0.25 and - 0.33 ± 0.08 while with data-based AM were - 0.00 ± 0.26 and - 0.28 ± 0.08. Only slight significance difference was found between using CT-based AM and using the data-based AM reconstruction delay phase on %DSUV of lesion. The scores associated with the two AMs matched well consistently. Our method may be used in delayed PET imaging, which allows no secondary CT radiation in delayed phase. The quantitative analysis for lesion detection purpose could be ensured.

  14. Aplicaciones del sistema GPS en la búsqueda de sitios para Interferometría Astronómica Milimétrica

    NASA Astrophysics Data System (ADS)

    Meza, A.; Fernández, L.; Natali, P.; Moirano, J.; Brunini, C.

    The water vapor content of the atmosphere is the biggest restriction to the Millimeter and Sub-millimeter Astronomy. It also plays a crucial role in most of the atmospheric processes. Nowadays water vapor is one of the less characterized meteorological parameter. It is a highly variable atmospheric constituent and its presence is a limiting factor to the obtention of high angular resolutions in interferometric observations of astrophysical interest. Thus, the improved determination of the percentage of precipitable water vapor (PWV) is widely appreciated when performing a site testing for Millimeter Astronomy (MA). It is extensive the use of Water Vapor Radiometers (WVRs) for characterizing the PWV. Using its typical frequency the WVR monitors at 22 Ghz., but some of them had been specially designed for MA at 183 Ghz (M.C. Wiedner, Atmospheric Water Vapour and Astronomical Millimetre Interferometry, PhD Thesis, 1998). Another possibility for PWV determinations are the Radiosondes (RS). A RS is a nothing but a set of sensors and radio transmitters carried out by a balloon up to 30.000 mts. They register twice a day (at 0 UTC and 12 UTC) the values of temperature, humidity and atmospheric pressure as a function of the altitude. All the observations are immediately transmitted to a ground station. At the beginning of the '90s GPS started to be used as an approach to the remote sensing of atmospheric water vapor (Bevis et al, Geophys. Res., 97, 15787, 1992). The radio signal GPS is delayed by the atmosphere as it propagate from the satellites to the ground-receivers. The tropospheric delay is modeled as the add of two contributions: a ``dry" and a ``wet" delay. Each of them is calculated as the product of a zenith path delay by a mapping function depending on the elevation angle. An estimate of the zenith wet delay can be transformed into an estimate of the PWV (Bevis et al, 1992; Hogg et al., A&A, 95, 304, 1981). Any of the former techniques can determine the PWV with an accuracy better than 1 millimeter of PWV. In this work we use the GPS to estimate the PWV. The procedure followed here is having comparable precision and accuracy with respect to the classical techniques (Coster et al., GPS-96, 625, 1996).

  15. Use of DES Modeling for Determining Launch Availability for SLS

    NASA Technical Reports Server (NTRS)

    Watson, Mike; Staton, Eric; Cates, Grant; Finn, Ron; Altino, Karen; Burns, Lee

    2014-01-01

    The National Aeronautics and Space Administration (NASA) is developing new capabilities for human and scientific exploration beyond Earth's orbit. This effort includes the Space Shuttle derived Space Launch System (SLS), the Multi-Purpose Crew Vehicle (MPCV) "Orion", and the Ground Systems Development and Operations (GSDO). There are several requirements and Technical Performance Measures (TPMs) that have been levied by the Exploration Systems Development (ESD) upon the SLS, MPCV, and GSDO Programs including an integrated Launch Availability (LA) TPM. The LA TPM is used to drive into the SLS, Orion and GSDO designs a high confidence of successfully launching exploration missions that have narrow Earth departure windows. The LA TPM takes into consideration the reliability of the overall system (SLS, Orion and GSDO), natural environments, likelihood of a failure, and the time required to recover from an anomaly. A challenge with the LA TPM is the interrelationships between SLS, Orion, GSDO and the natural environments during launch countdown and launch delays that makes it impossible to develop an analytical solution for calculating the integrated launch probability. This paper provides an overview of how Discrete Event Simulation (DES) modeling was used to develop the LA TPM, how it was allocated down to the individual programs, and how the LA analysis is being used to inform and drive the SLS, Orion, and GSDO designs to ensure adequate launch availability for future human exploration.

  16. Use of DES Modeling for Determining Launch Availability for SLS

    NASA Technical Reports Server (NTRS)

    Staton, Eric; Cates, Grant; Finn, Ronald; Altino, Karen M.; Burns, K. Lee; Watson, Michael D.

    2014-01-01

    The National Aeronautics and Space Administration (NASA) is developing new capabilities for human and scientific exploration beyond Earth's orbit. This effort includes the Space Shuttle derived Space Launch System (SLS), the Orion Multi-Purpose Crew Vehicle (MPCV), and the Ground Systems Development and Operations (GSDO). There are several requirements and Technical Performance Measures (TPMs) that have been levied by the Exploration Systems Development (ESD) upon the SLS, Orion, and GSDO Programs including an integrated Launch Availability (LA) TPM. The LA TPM is used to drive into the SLS, Orion and GSDO designs a high confidence of successfully launching exploration missions that have narrow Earth departure windows. The LA TPM takes into consideration the reliability of the overall system (SLS, Orion and GSDO), natural environments, likelihood of a failure, and the time required to recover from an anomaly. A challenge with the LA TPM is the interrelationships between SLS, Orion, GSDO and the natural environments during launch countdown and launch delays that makes it impossible to develop an analytical solution for calculating the integrated launch probability. This paper provides an overview of how Discrete Event Simulation (DES) modeling was used to develop the LA TPM, how it was allocated down to the individual programs, and how the LA analysis is being used to inform and drive the SLS, Orion, and GSDO designs to ensure adequate launch availability for future human exploration.

  17. Primordial prevention of cardiovascular disease among African-Americans: a social epidemiological perspective.

    PubMed

    James, S A

    1999-12-01

    The primordial prevention of cardiovascular disease (CVD) among African-Americans represents a formidable challenge for public health. This paper discusses the nature of this challenge, highlighting the role that economic and cultural factors play in shaping the distributions of major CVD risk factors among African-Americans. The paper concludes with specific suggestions for research. Data from recent national health surveys on black/white differences in major CVD risk factors like hypertension, obesity, cholesterol, cigarette smoking, and physical inactivity were reviewed for the purpose of identifying promising avenues for primordial prevention research among African-Americans. Cigarette smoking has a delayed onset among African-Americans compared to whites. Black/white differences in "vigorous" leisure-time physical activity (e.g., social dancing and team sports) are not apparent until around age 40. These findings have relevance for primordial prevention work in black communities since they suggest the existence of broad-based, health-relevant cultural norms which could support primordial prevention programs, such as regular physical activity, across the life cycle. CVD primordial prevention programs among African-Americans must be grounded in an understanding of how cultural values as well as economic conditions shape CVD risk factor distributions in this population. Ultimate success will depend on the strength of the partnerships that public health researchers, primary care providers, and community residents are able to build.

  18. Orion EFT-1 Heat Shield move from LASF to VAB for Ground Test Article Integration

    NASA Image and Video Library

    2017-04-26

    The heat shield for Exploration Flight Test-1 is transferred from the Orion Program to the Ground Systems Development and Operations Program, Landing and Recovery Operations to be integrated with the Ground Test Article to be utilized for future Underway Recovery Testing. After transport from the Launch Abort System Facility (LASF) to the Vehicle Assembly Building (VAB), the heat shield is lifted off of the transport truck and placed onto foam pads (dunnage) for inspection in Highbay 2 of the VAB.

  19. A Discussion of Patient Safety Programs in the United States Air Force Ground Medical Expeditionary Environment and an Analysis of Potential Solutions for Increasing Their Effectiveness

    DTIC Science & Technology

    2017-05-01

    and 4N to work Patient Safety together, and it has worked out fine in our environment .” • “It is my opinion that there needs to be a permanent full...GROUND MEDICAL EXPEDITIONARY ENVIRONMENT AND AN ANALYSIS OF POTENTIAL SOLUTIONS FOR INCREASING THEIR EFFECTIVENESS By: James Lee...DISCUSSION OF PATIENT SAFETY PROGRAMS IN THE UNITED STATES AIR FORCE GROUND MEDICAL EXPEDITIONARY ENVIRONMENT AND AN ANALYSIS OF POTENTIAL SOLUTIONS FOR

  20. Southwest principal aquifers regional ground-water quality assessment

    USGS Publications Warehouse

    Anning, D.W.; Thiros, Susan A.; Bexfield, L.M.; McKinney, T.S.; Green, J.M.

    2009-01-01

    The National Water-Quality Assessment (NAWQA) Program of the U.S. Geological Survey is conducting a regional analysis of water quality in the principal aquifers in the southwestern United States. The Southwest Principal Aquifers (SWPA) study is building a better understanding of the susceptibility and vulnerability of basin-fill aquifers in the region to ground-water contamination by synthesizing the baseline knowledge of ground-water quality conditions in 15 basins previously studied by the NAWQA Program. The improved understanding of aquifer susceptibility and vulnerability to contamination is assisting in the development of tools that water managers can use to assess and protect the quality of ground-water resources. This fact sheet provides an overview of the basin-fill aquifers in the southwestern United States and description of the completed and planned regional analyses of ground-water quality being performed by the SWPA study.

Top