Sample records for grout sampling plan

  1. Laboratory Testing of Silica Sol Grout in Coal Measure Mudstones.

    PubMed

    Pan, Dongjiang; Zhang, Nong; Xie, Zhengzheng; Feng, Xiaowei; Kong, Yong

    2016-11-22

    The effectiveness of silica sol grout on mudstones is reported in this paper. Using X-ray diffraction (XRD), the study investigates how the silica sol grout modifies mudstone mineralogy. Micropore sizes and mechanical properties of the mudstone before and after grouting with four different materials were determined with a surface area/porosity analyser and by uniaxial compression. Tests show that, after grouting, up to 50% of the mesopore volumes can be filled with grout, the dominant pore diameter decreases from 100 nm to 10 nm, and the sealing capacity is increased. Uniaxial compression tests of silica sol grouted samples shows that their elastic modulus is 21%-38% and their uniaxial compressive strength is 16%-54% of the non-grouted samples. Peak strain, however, is greater by 150%-270%. After grouting, the sample failure mode changes from brittle to ductile. This paper provides an experimental test of anti-seepage and strengthening properties of silica sol.

  2. TANKS 18 AND 19-F EQUIPMENT GROUT FILL MATERIAL EVALUATION AND RECOMMENDATIONS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stefanko, D.; Langton, C.

    The United States Department of Energy (US DOE) intends to remove Tanks 18-F and 19-F at the Savannah River Site (SRS) from service. The high-level waste (HLW) tanks have been isolated from the F-area Tank Farm (FTF) facilities and will be filled with cementitious grout for the purpose of: (1) physically stabilizing the empty volumes in the tanks, (2) limiting/eliminating vertical pathways from the surface to residual waste on the bottom of the tanks, (3) providing an intruder barrier, and (4) providing an alkaline, chemical reducing environment within the closure boundary to limit solubility of residual radionuclides. Bulk waste andmore » heel waste removal equipment will remain in Tanks 18-F and 19-F when the tanks are closed. This equipment includes: mixer pumps, transfer pumps, transfer jets, equipment support masts, sampling masts and dip tube assemblies. The current Tank 18-F and 19-F closure strategy is to grout the internal void spaces in this equipment to eliminate fast vertical pathways and slow water infiltration to the residual material on the tank floor. This report documents the results of laboratory testing performed to identify a grout formulation for filling the abandoned equipment in Tanks 18-F and 19-F. The objective of this work was to formulate a flowable grout for filling internal voids of equipment that will remain in Tanks 18-F and 19-F during the final closures. This work was requested by V. A. Chander, Tank Farm Closure Engineering, in HLW-TTR-2011-008. The scope for this task is provided in the Task Technical and Quality Assurance Plan (TTQAP), SRNL-RP-2011-00587. The specific objectives of this task were to: (1) Prepare and evaluate the SRR cooling coil grout identified in WSRC-STI-2008-00298 per the TTR for this work. The cooling coil grout is a mixture of BASF MasterFlow{reg_sign} 816 cable grout (67.67 wt. %), Grade 100 ground granulated blast furnace slag (7.52 wt. %) and water (24.81 wt. %); (2) Identify equipment grout placement and performance properties; (3) Design up to 2 additional grout systems for filling the Tank 18-F and Tank 19-F equipment; (4) Prepare samples of candidate grouts and measure fresh properties, thermal properties and cured properties; (5) Recommend a grout for the Tier 1A equipment fill mock up - ADMP 4 foot high mock up, 1 inch and 2 inch pipes; (6) Support procurement of materials for the Tier 1A equipment fill mock up test; (7) Prepare samples of the recommended grout for hydraulic property measurements which can be used for comparison to values used in the F- Tank Farm Performance Assessment (PA); and (8) Document equipment fill grout data and recommendations in a report.« less

  3. Design and Control of Chemical Grouting : Volume 4 - Executive Summary

    DOT National Transportation Integrated Search

    1983-04-01

    This report focuses on the engineering practice of chemical grouting, summarizing the findings of a study to improve design and control techniques for chemical grouting in soils. Improved methods for the planning, control and evaluation of chemical g...

  4. Laboratory Testing of Silica Sol Grout in Coal Measure Mudstones

    PubMed Central

    Pan, Dongjiang; Zhang, Nong; Xie, Zhengzheng; Feng, Xiaowei; Kong, Yong

    2016-01-01

    The effectiveness of silica sol grout on mudstones is reported in this paper. Using X-ray diffraction (XRD), the study investigates how the silica sol grout modifies mudstone mineralogy. Micropore sizes and mechanical properties of the mudstone before and after grouting with four different materials were determined with a surface area/porosity analyser and by uniaxial compression. Tests show that, after grouting, up to 50% of the mesopore volumes can be filled with grout, the dominant pore diameter decreases from 100 nm to 10 nm, and the sealing capacity is increased. Uniaxial compression tests of silica sol grouted samples shows that their elastic modulus is 21%–38% and their uniaxial compressive strength is 16%–54% of the non-grouted samples. Peak strain, however, is greater by 150%–270%. After grouting, the sample failure mode changes from brittle to ductile. This paper provides an experimental test of anti-seepage and strengthening properties of silica sol. PMID:28774061

  5. Experimental Characterization of Stress- and Strain-Dependent Stiffness in Grouted Rock Masses.

    PubMed

    Kim, Ji-Won; Chong, Song-Hun; Cho, Gye-Chun

    2018-03-29

    Grouting of fractured rock mass prior to excavation results in grout-filled discontinuities that govern the deformation characteristics of a site. The influence of joint characteristics on the properties of grouted rocks is important in assessing the effects of grouting on jointed rock mass. However, grouting remains a predominantly empirical practice and the effects of grouting on rock joint behavior and material properties have yet to be accurately assessed. Granular materials, including jointed rocks, typically display nonlinear strain-dependent responses that can be characterized by the shear modulus degradation curve. In this study, the effects of grouting on the strain-dependent shear stiffness of jointed rock mass were investigated at the small-strain (below 10 -5 ) and mid-strain (10 -5 to 10 -3 ) ranges using the quasi-static resonant column test and rock mass dynamic test devices. The effects of curing time, axial stress, initial joint roughness, and grouted joint thickness were examined. The results show that (1) grouting of rock joints leads to decreased stress sensitivity and increased small-strain shear stiffness for all tested samples; (2) the grouted rock samples display similar modulus degradation characteristics as the applied grout material; (3) the initial joint roughness determines the stress-dependent behaviors and general stiffness range of the jointed and grouted rocks, but the strain-dependent behaviors are dependent on the properties of the grout material; (4) increased grouted joint thickness results in larger contribution of the grout properties in the overall grouted rock mass.

  6. Experimental Characterization of Stress- and Strain-Dependent Stiffness in Grouted Rock Masses

    PubMed Central

    Cho, Gye-Chun

    2018-01-01

    Grouting of fractured rock mass prior to excavation results in grout-filled discontinuities that govern the deformation characteristics of a site. The influence of joint characteristics on the properties of grouted rocks is important in assessing the effects of grouting on jointed rock mass. However, grouting remains a predominantly empirical practice and the effects of grouting on rock joint behavior and material properties have yet to be accurately assessed. Granular materials, including jointed rocks, typically display nonlinear strain-dependent responses that can be characterized by the shear modulus degradation curve. In this study, the effects of grouting on the strain-dependent shear stiffness of jointed rock mass were investigated at the small-strain (below 10−5) and mid-strain (10−5 to 10−3) ranges using the quasi-static resonant column test and rock mass dynamic test devices. The effects of curing time, axial stress, initial joint roughness, and grouted joint thickness were examined. The results show that (1) grouting of rock joints leads to decreased stress sensitivity and increased small-strain shear stiffness for all tested samples; (2) the grouted rock samples display similar modulus degradation characteristics as the applied grout material; (3) the initial joint roughness determines the stress-dependent behaviors and general stiffness range of the jointed and grouted rocks, but the strain-dependent behaviors are dependent on the properties of the grout material; (4) increased grouted joint thickness results in larger contribution of the grout properties in the overall grouted rock mass. PMID:29596371

  7. Simulation of Grouting Process in Rock Masses Under a Dam Foundation Characterized by a 3D Fracture Network

    NASA Astrophysics Data System (ADS)

    Deng, Shaohui; Wang, Xiaoling; Yu, Jia; Zhang, Yichi; Liu, Zhen; Zhu, Yushan

    2018-06-01

    Grouting plays a crucial role in dam safety. Due to the concealment of grouting activities, complexity of fracture distribution in rock masses and rheological properties of cement grout, it is difficult to analyze the effects of grouting. In this paper, a computational fluid dynamics (CFD) simulation approach of dam foundation grouting based on a 3D fracture network model is proposed. In this approach, the 3D fracture network model, which is based on an improved bootstrap sampling method and established by VisualGeo software, can provide a reliable and accurate geometric model for CFD simulation of dam foundation grouting. Based on the model, a CFD simulation is performed, in which the Papanastasiou regularized model is used to express the grout rheological properties, and the volume of fluid technique is utilized to capture the grout fronts. Two sets of tests are performed to verify the effectiveness of the Papanastasiou regularized model. When applying the CFD simulation approach for dam foundation grouting, three technical issues can be solved: (1) collapsing potential of the fracture samples, (2) inconsistencies in the geometric model in actual fractures under complex geological conditions, and (3) inappropriate method of characterizing the rheological properties of cement grout. The applicability of the proposed approach is demonstrated by an illustrative case study—a hydropower station dam foundation in southwestern China.

  8. Rock Mass Grouting in the Løren Tunnel: Case Study with the Main Focus on the Groutability and Feasibility of Drill Parameter Interpretation

    NASA Astrophysics Data System (ADS)

    Høien, Are Håvard; Nilsen, Bjørn

    2014-05-01

    The Løren road tunnel is a part of a major project at Ring road 3 in Oslo, Norway. The rock part of the tunnel is 915 m long and has two tubes with three lanes and breakdown lanes. Strict water ingress restriction was specified and continuous rock mass grouting was, therefore, carried out for the entire tunnel, which was excavated in folded Cambro-Silurian shales intruded by numerous dykes. This paper describes the rock mass grouting that was carried out for the Løren tunnel. Particular emphasis is placed on discussing grout consumption and the challenges that were encountered when passing under a distinct rock depression. Measurement while drilling (MWD) technology was used for this project, and, in this paper, the relationships between the drill parameter interpretation (DPI) factors water and fracturing are examined in relation to grout volumes. A lowering of the groundwater table was experienced during excavation under the rock depression, but the groundwater was nearly re-established after completion of the main construction work. A planned 80-m watertight concrete lining was not required to be built due to the excellent results from grouting in the rock depression area. A relationship was found between leakages mapped in the tunnel and the DPI water factor, indicating that water is actually present where the DPI water factor shows water in the rock. It is concluded that, for the Løren tunnel, careful planning and high-quality execution of the rock mass grouting made the measured water ingress meet the restrictions. For future projects, the DPI water factor may be used to give a better understanding of the material in which the rock mass grouting is performed and may also be used to reduce the time spent and volumes used when grouting.

  9. An experimental study on dynamic response for MICP strengthening liquefiable sands

    NASA Astrophysics Data System (ADS)

    Han, Zhiguang; Cheng, Xiaohui; Ma, Qiang

    2016-12-01

    The technology of bio-grouting is a new technique for soft ground improvement. Many researchers have carried out a large number of experiments and study on this topic. However, few studies have been carried out on the dynamic response of solidified sand samples, such reducing liquefaction in sand. To study this characteristic of microbial-strengthened liquefiable sandy foundation, a microorganism formula and grouting scheme is applied. After grouting, the solidified samples are tested via dynamic triaxial testing to examine the cyclic performance of solidified sand samples. The results indicate that the solidified sand samples with various strengths can be obtained to meet different engineering requirements, the use of bacteria solution and nutritive salt is reduced, and solidified time is shortened to 1-2 days. Most importantly, in the study of the dynamic response, it is found that the MICP grouting scheme is effective in improving liquefiable sand characteristic, such as liquefaction resistance.

  10. ENVIRONMENTAL TECHNOLOGY VERIFICATION PROGRAM: PROTOCOL FOR THE VERIFICATION OF GROUTING MATERIALS FOR INFRASTRUCTURE REHABILITATION AT THE UNIVERSITY OF HOUSTON - CIGMAT

    EPA Science Inventory

    This protocol was developed under the Environmental Protection Agency's Environmental Technology Verification (ETV) Program, and is intended to be used as a guide in preparing laboratory test plans for the purpose of verifying the performance of grouting materials used for infra...

  11. Repair of the DSS-14 Pedestal Concrete

    NASA Technical Reports Server (NTRS)

    Mcclure, D.

    1985-01-01

    About three years after the Goldstone Deep Space Station antenna was dedicated, grout under the hydrostatic bearing runner was found to be interacting with the runner, causing rust to form between the runner and the sole plates upon which it rests. The rust formed unevenly and the runner could not be kept flat so in 1969 the grout was removed and replaced with a Portland cement and sand dry pack grout that was less likely to produce rust. In the years that followed, oil leaking from the runner assembly caused progressive deterioration of the drypack grout. In 1982 over one thousand hours of spacecraft tracking time were lost due to this deterioration. A plan was developed to rehabilitate the bearing. The plan called for raising the rotating structure free from the concrete pedestal and placing it on three pairs of external support columns. With the weight of the structure transferred to the columns, the pads and runner could be removed and the repair started. The very successful repair included the replacement of a significant portion of the antenna pedestal.

  12. Guidelines for Sampling, Assessing, and Restoring Defective Grout in Prestressed Concrete Bridge Post-Tensioning Ducts

    DOT National Transportation Integrated Search

    2013-05-01

    This document is a technical summary of the Federal Highway Administration report, "Guidelines for Sampling, Assessing, and Restoring Defective Grout in Prestressed Concrete Bridge Post-Tensioning Ducts" (FHWA-HRT-13-028). The objectives of this stud...

  13. Test plan for formulation and evaluation of grouted waste forms with shine process wastes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ebert, W. L.; Jerden, J. L.

    2015-09-01

    The objective of this experimental project is to demonstrate that waste streams generated during the production of Mo99 by the SHINE Medical Technologies (SHINE) process can be immobilized in cement-based grouted waste forms having physical, chemical, and radiological stabilities that meet regulatory requirements for handling, storage, transport, and disposal.

  14. Effects of Using Silica Fume and Polycarboxylate-Type Superplasticizer on Physical Properties of Cementitious Grout Mixtures for Semiflexible Pavement Surfacing

    PubMed Central

    Karim, Mohamed Rehan; Mahmud, Hilmi; Mashaan, Nuha S.; Katman, Herdayati; Husain, Nadiah Md

    2014-01-01

    Semi-flexible pavement surfacing is a composite pavement that utilizes the porous pavement structure of the flexible bituminous pavement, which is subsequently grouted with appropriate cementitious materials. This study aims to investigate the compressive strength, flexural strength, and workability performance of cementitious grout. The grout mixtures are designed to achieve high strength and maintain flow properties in order to allow the cement slurries to infiltrate easily through unfilled compacted skeletons. A paired-sample t-test was carried out to find out whether water/cement ratio, SP percentages, and use of silica fume influence the cementitious grout performance. The findings showed that the replacement of 5% silica fume with an adequate amount of superplasticizer and water/cement ratio was beneficial in improving the properties of the cementitious grout. PMID:24526911

  15. Effects of using silica fume and polycarboxylate-type superplasticizer on physical properties of cementitious grout mixtures for semiflexible pavement surfacing.

    PubMed

    Koting, Suhana; Karim, Mohamed Rehan; Mahmud, Hilmi; Mashaan, Nuha S; Ibrahim, Mohd Rasdan; Katman, Herdayati; Husain, Nadiah Md

    2014-01-01

    Semi-flexible pavement surfacing is a composite pavement that utilizes the porous pavement structure of the flexible bituminous pavement, which is subsequently grouted with appropriate cementitious materials. This study aims to investigate the compressive strength, flexural strength, and workability performance of cementitious grout. The grout mixtures are designed to achieve high strength and maintain flow properties in order to allow the cement slurries to infiltrate easily through unfilled compacted skeletons. A paired-sample t-test was carried out to find out whether water/cement ratio, SP percentages, and use of silica fume influence the cementitious grout performance. The findings showed that the replacement of 5% silica fume with an adequate amount of superplasticizer and water/cement ratio was beneficial in improving the properties of the cementitious grout.

  16. Modification of hydraulic conductivity in granular soils using waste materials.

    PubMed

    Akbulut, S; Saglamer, A

    2004-01-01

    This paper evaluates the use of waste products such as silica fume and fly ash in modification of the granular soils in order to remove some environmental problems and create new useful findings in the field of engineering. It is known that silica fume and fly ash, as well as clay material, are used in geotechnical engineering because of their pozzolanic reactivity and fineness to improve the soil properties needed with respect to engineering purposes. The main objective of this research project was to investigate the use of these materials in geotechnical engineering and to improve the hydraulic properties of soils by means of grouting. For this reason, firstly, suitable grouts in suspension forms were prepared by using silica fume, fly ash, clay and cement in different percentages. The properties of these cement-based grouts were then determined to obtain the desired optimum values for grouting. After that, these grouts were penetrated into the soil samples under pressure. The experimental work indicates that these waste materials and clay improved the physical properties and the fluidity of the cement-based grouts and they also decreased the hydraulic conductivity of the grouted soil samples by sealing the voids of the soil. The results of this study have important findings concerning the use of these materials in soil treatment and the improvement of hydraulic conductivity of the soils.

  17. Long-Term Mechanical Behavior of Nano Silica Sol Grouting

    PubMed Central

    Zhang, Nong; Zhang, Chenghao; Qian, Deyu; Han, Changliang; Yang, Sen

    2018-01-01

    The longevity of grouting has a significant effect on the safe and sustainable operation of many engineering projects. A 500-day experiment was carried out to study the long-term mechanical behavior of nano silica sol grouting. The nano silica sol was activated with different proportions of a NaCl catalyst and cured under fluctuating temperature and humidity conditions. The mechanical parameters of the grout samples were tested using an electrohydraulic uniaxial compression tester and an improved Vicat instrument. Scanning electron microscope, X-ray diffraction, and ultrasonic velocity tests were carried out to analyze the strength change micro-mechanism. Tests showed that as the catalyst dosage in the grout mix is decreased, the curves on the graphs showing changes in the weight and geometric parameters of the samples over time could be divided into three stages, a shrinkage stage, a stable stage, and a second shrinkage stage. The catalyst improved the stability of the samples and reduced moisture loss. Temperature rise was also a driving force for moisture loss. Uniaxial compressive stress-strain curves for all of the samples were elastoplastic. The curves for uniaxial compression strength and secant modulus plotted against time could be divided into three stages. Sample brittleness increased with time and the brittleness index increased with higher catalyst dosages in the latter part of the curing time. Plastic strength-time curves exhibit allometric scaling. Curing conditions mainly affect the compactness, and then affect the strength. PMID:29337897

  18. Quality Assurance Plan for Placement of Cold-Cap Grout, Demonstration Vault, Hanford Grout Vault Program

    DTIC Science & Technology

    1992-08-01

    recommend that representatives of the WES Concrete Technology Division be onsite during the placement and postplacement phases to offer technical...written before field placement. PREFACE The work described in this report is part of an ongoing research effort accomplished in the Concrete Technology ... Division (CTD), Structures Laboratory (SL), U.S. Army Engineer Waterways Experiment Station (WES), under Interagency Agreement from the Department of

  19. Saltstone SDU6 Modeling Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, Si Y.; Hyun, Sinjae

    2013-01-10

    A new disposal unit, designated as Saltstone Disposal Unit 6 (SDU6), is being designed for support of site accelerated closure goals and salt waste projections identified in the new Liquid Waste System Plan. The unit is a cylindrical disposal cell of 375 ft in diameter and 43 ft in height, and it has a minimum 30 million gallons of capacity. SRNL was requested to evaluate the impact of an increased grout placement height on the flow patterns radially spread on the floor and to determine whether grout quality is impacted by the height. The primary goals of the work aremore » to develop the baseline Computational Fluid Dynamics (CFD) model and to perform the evaluations for the flow patterns of grout material in SDU6 as a function of elevation of grout discharge port and grout rheology. Two transient grout models have been developed by taking a three-dimensional multiphase CFD approach to estimate the domain size of the grout materials radially spread on the facility floor and to perform the sensitivity analysis with respect to the baseline design and operating conditions such as elevation height of the discharge port and fresh grout properties. For the CFD modeling calculations, air-grout Volume of Fluid (VOF) method combined with Bingham plastic and time-dependent grout models were used for examining the impact of fluid spread performance for the initial baseline configurations and to evaluate the impact of grout pouring height on grout quality. The grout quality was estimated in terms of the air volume fraction for the grout layer formed on the SDU6 floor, resulting in the change of grout density. The study results should be considered as preliminary scoping analyses since benchmarking analysis is not included in this task scope. Transient analyses with the Bingham plastic model were performed with the FLUENTTM code on the high performance parallel computing platform in SRNL. The analysis coupled with a transient grout aging model was performed by using ANSYS-CFX code in the parallel computing platform in Mercer University. Recommended operational guidance was developed assuming that local shear rates and flow patterns related to radial spread along the SDU floor can be used as a measure of grout performance and spatial dispersion affected by the grout height and viscosity. The 5 ft height baseline results show that when the 150 gpm grout flow with a 5 Pa yield stress and a 60 cp viscosity is poured down through a 3 inch discharge port, the grout is spread radially up to about 64 ft distance from the pouring center after 2 hours' pouring time. The air volume fraction of the grout layer is about 29% at 5 minutes' transient time, and it is reduced by about 9% in 2 hours' pouring time, resulting in the grout density consisting of about 80% grout and 20% air volume fractions. The sensitivity results show that when the discharge port is located at a higher position, a larger amount of air is trapped inside the layer formed below the discharge port at the early transient time of less than 30 minutes because of the higher impinging momentum of the grout flow on the floor, resulting in the formation of less smooth layer. The results clearly indicate that the radial spread for the 43 ft discharge port is about 10% faster than that of the 5 ft discharge port for the early transient period of 5 minutes. However, for the pouring time longer than half an hour, the discharge port height does not affect the radial distance spread on the disposal floor. When grout quality is related to grout volume fraction, the grout volume fraction for the 43 ft discharge port has lower volume fraction than the 5 ft discharge port for the transient period of the first 5 minutes. However, for the pouring time longer than half an hour, the discharge port height does not affect the grout volume fraction for the layer accumulated on the disposal floor. A modified Bingham plastic model coupled with time-dependent viscosity behavior was developed for conducting the initial scoping calculations to assess the impact of fluid residence time on radial spreading and basic flow patterns. The results for the transient viscosity model show that when grout material becomes more viscous, the thickness of the grout layer accumulated on the floor becomes higher, but the radial distance spread on the horizontal floor becomes smaller. The early transient results for the grout density with about 32% air volume fractions are in reasonable agreement with those of the idealized Bingham plastic model. It is recommended that the current models developed here be benchmarked against the experimental results for critical applications of the modeling results.« less

  20. Guidelines for Sampling, Assessing, and Restoring Defective Grout in Prestressed Concrete Bridge Post-Tensioning Ducts

    DOT National Transportation Integrated Search

    2013-10-01

    A significant proportion of the United States bridge inventory is based on bonded post-tensioned (PT) concrete construction. An important aspect of maintaining corrosion protection of these PT systems is assuring that tendon ducts are properly groute...

  1. Guidelines for sampling, assessing, and restoring defective grout in prestressed concrete bridge post-tensioning ducts.

    DOT National Transportation Integrated Search

    2013-10-01

    "A significant proportion of the U.S. bridge inventory is based on bonded post-tensioned (PT) concrete construction. An : important aspect of maintaining corrosion protection of these PT systems is assuring that tendon ducts are properly grouted : wi...

  2. Determining the Release of Radionuclides from Tank 18F Waste Residual Solids: FY2016 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    King, William D.; Hobbs, David T.

    Pore water leaching studies were conducted on actual Savannah River Site (SRS) Tank 18F residual waste solids to support Liquid Waste tank closure efforts. A test methodology was developed during previous simulant testing to produce slurries of tank residual solids and grout-representative solids in grout pore water solutions (based on SRS groundwater compositions) with pH and E h values expected during the aging of the closed waste tank. The target conditions are provided below where the initial pore water has a reducing potential and a relatively high pH (Reducing Region II). The pore water is expected to become increasingly oxidizingmore » with time (Oxidizing Region II) and during the latter stages of aging (Oxidizing Region III) the pH is expected to decrease. For the reducing case, tests were conducted with both unwashed and washed Tank 18F residual solids. For the oxidizing cases (Oxidizing Regions II and III), all samples were washed with simulated grout pore water solutions prior to testing, since it is expected that these conditions will occur after considerable pore water solution has passed through the system. For the reducing case, separate tests were conducted with representative ground grout solids and with calcium carbonate reagent, which is the grout phase believed to be controlling the pH. Ferrous sulfide (FeS) solids were also added to the reducing samples to lower the slurry E h value. Calcium carbonate solids were used as the grout-representative solid phase for each of the oxidizing cases. Air purge-gas with and without CO 2 removed was transferred through the oxidizing test samples and nitrogen purge-gas was transferred through the reducing test samples during leach testing. The target pH values were achieved to within 0.5 pH units for all samples. Leaching studies were conducted over an E h range of approximately 0.7 V. However, the highest and lowest E h values achieved of ~+0.5 V and ~-0.2 V were significantly less positive and less negative, respectively, than the target values. Achievement of more positive and more negative E h values is believed to require the addition of non-representative oxidants and reductants, respectively.« less

  3. Leach test of cladding removal waste grout using Hanford groundwater

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Serne, R.J.; Martin, W.J.; Legore, V.L.

    1995-09-01

    This report describes laboratory experiments performed during 1986-1990 designed to produce empirical leach rate data for cladding removal waste (CRW) grout. At the completion of the laboratory work, funding was not available for report completion, and only now during final grout closeout activities is the report published. The leach rates serve as inputs to computer codes used in assessing the potential risk from the migration of waste species from disposed grout. This report discusses chemical analyses conducted on samples of CRW grout, and the results of geochemical computer code calculations that help identify mechanisms involved in the leaching process. Themore » semi-infinite solid diffusion model was selected as the most representative model for describing leaching of grouts. The use of this model with empirically derived leach constants yields conservative predictions of waste release rates, provided no significant changes occur in the grout leach processes over long time periods. The test methods included three types of leach tests--the American Nuclear Society (ANS) 16.1 intermittent solution exchange test, a static leach test, and a once-through flow column test. The synthetic CRW used in the tests was prepared in five batches using simulated liquid waste spiked with several radionuclides: iodine ({sup 125}I), carbon ({sup 14}C), technetium ({sup 99}Tc), cesium ({sup 137}Cs), strontium ({sup 85}Sr), americium ({sup 241}Am), and plutonium ({sup 238}Pu). The grout was formed by mixing the simulated liquid waste with dry blend containing Type I and Type II Portland cement, class F fly ash, Indian Red Pottery clay, and calcium hydroxide. The mixture was allowed to set and cure at room temperature in closed containers for at least 46 days before it was tested.« less

  4. The differences between soil grouting with cement slurry and cement-water glass slurry

    NASA Astrophysics Data System (ADS)

    Zhu, Mingting; Sui, Haitong; Yang, Honglu

    2018-01-01

    Cement slurry and cement-water glass slurry are the most widely applied for soil grouting reinforcement project. The viscosity change of cement slurry is negligible during grouting period and presumed to be time-independent while the viscosity of cement-water glass slurry increases with time quickly and is presumed to be time-dependent. Due to the significantly rheology differences between them, the grouting quality and the increasing characteristics of grouting parameters may be different, such as grouting pressure, grouting surrounding rock pressure, i.e., the change of surrounding rock pressure deduced by grouting pressure. Those are main factors for grouting design. In this paper, a large-scale 3D grouting simulation device was developed to simulate the surrounding curtain grouting for a tunnel. Two series of surrounding curtain grouting experiments under different geo-stress of 100 kPa, 150 kPa and 200 kPa were performed. The overload test on tunnel was performed to evaluate grouting effect of all surrounding curtain grouting experiments. In the present results, before 240 seconds, the grouting pressure increases slowly for both slurries; after 240 seconds the increase rate of grouting pressure for cement-water glass slurry increases quickly while that for cement slurry remains roughly constant. The increasing trend of grouting pressure for cement-water glass is similar to its viscosity. The setting time of cement-water glass slurry obtained from laboratory test is less than that in practical grouting where grout slurry solidifies in soil. The grouting effect of cement-water glass slurry is better than that of cement slurry and the grouting quality decreases with initial pressure.

  5. Tanks 18 And 19-F Structural Flowable Grout Fill Material Evaluation And Recommendations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Langton, C. A.; Stefanko, D. B.

    2013-04-23

    Cementitious grout will be used to close Tanks 18-F and 19-F. The functions of the grout are to: 1) physically stabilize the final landfill by filling the empty volume in the tanks with a non-compressible material; 2) provide a barrier for inadvertent intrusion into the tank; 3) reduce contaminant mobility by a) limiting the hydraulic conductivity of the closed tank and b) reducing contact between the residual waste and infiltrating water; and 4) providing an alkaline, chemically reducing environment in the closed tank to control speciation and solubility of selected radionuclides. The objective of this work was to identify amore » single (all-in-one) grout to stabilize and isolate the residual radionuclides in the tank, provide structural stability of the closed tank and serve as an inadvertent intruder barrier. This work was requested by V. A. Chander, High Level Waste (HLW) Tank Engineering, in HLW-TTR-2011-008. The complete task scope is provided in the Task Technical and QA Plan, SRNL-RP-2011-00587 Revision 0. The specific objectives of this task were to: 1) Identify new admixtures and dosages for formulating a zero bleed flowable tank fill material selected by HLW Tank Closure Project personnel based on earlier tank fill studies performed in 2007. The chemical admixtures used for adjusting the flow properties needed to be updated because the original admixture products are no longer available. Also, the sources of cement and fly ash have changed, and Portland cements currently available contain up to 5 wt. % limestone (calcium carbonate). 2) Prepare and evaluate the placement, compressive strength, and thermal properties of the selected formulation with new admixture dosages. 3) Identify opportunities for improving the mix selected by HLW Closure Project personnel and prepare and evaluate two potentially improved zero bleed flowable fill design concepts; one based on the reactor fill grout and the other based on a shrinkage compensating flowable fill mix design. 4) Prepare samples for hydraulic property measurements for comparison to the values in the F and H- Tank Farm Performance Assessments (PAs). 5) Identify a grout mix for the Tanks 18-F and 19-F Grout Procurement Specification [Forty, 2011 a, b, c]. Results for two flowable zero bleed structural fill concepts containing 3/8 inch gravel (70070 Series and LP#8 Series) and a sand only mix (SO Series) are provided in this report. Tank Farm Engineering and SRNL Project Management selected the 70070 mix as the base case for inclusion in Revision 0 of the Tanks 18-F and 19-F grout procurement specification [Forty 2011 a] and requested admixture recommendations and property confirmation for this formulation [Forty, 2011 b]. Lower cementitious paste mixes were formulated because the 70070 mix is over designed with respect to strength and generates more heat from hydration reactions than is desirable for mass pour application. Work was also initiated on a modification of the recommended mix which included shrinkage compensation to mitigate fast pathways caused by shrinkage cracking and poor physical bonding to the tank and ancillary equipment. Testing of this option was postponed to FY12. Mix, LP#8-16 is recommended for inclusion in the specification for furnishing and delivering tank closure grout for Tanks 18-F and 19-F [Forty, 2011 c]. A shrinkage compensating variation of this mix, LP#16C, has not been fully developed and characterized at this time.« less

  6. Demonstration of close-coupled barriers for subsurface containment of buried waste

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dwyer, B.P.

    1996-05-01

    A close-coupled barrier is produced by first installing a conventional cement grout curtain followed by a thin inner lining of a polymer grout. The resultant barrier is a cement polymer composite that has economic benefits derived from the cement and performance benefits from the durable and resistant polymer layer. Close-coupled barrier technology is applicable for final, interim, or emergency containment of subsurface waste forms. Consequently, when considering the diversity of technology application, the construction emplacement and material technology maturity, general site operational requirements, and regulatory compliance incentives, the close-coupled barrier system provides an alternative for any hazardous or mixed wastemore » remediation plan. This paper discusses the installation of a close-coupled barrier and the subsequent integrity verification. The demonstration was installed at a benign site at the Hanford Geotechnical Test Facility, 400 Area, Hanford, Washington. The composite barrier was emplaced beneath a 7,500 liter tank. The tank was chosen to simulate a typical DOE Complex waste form. The stresses induced on the waste form were evaluated during barrier construction. The barrier was constructed using conventional jet grouting techniques. Drilling was completed at a 45{degree} angle to the ground, forming a conical shaped barrier with the waste form inside the cone. Two overlapping rows of cylindrical cement columns were grouted in a honeycomb fashion to form the secondary backdrop barrier layer. The primary barrier, a high molecular weight polymer manufactured by 3M Company, was then installed providing a relatively thin inner liner for the secondary barrier. The primary barrier was emplaced by panel jet grouting with a dual wall drill stem, two phase jet grouting system.« less

  7. Corrective Action Plan for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order. CAU 563 consists of four Corrective Action Sites (CASs) located in Areas 3 and 12 of the Nevada Test Site. CAU 563 consists of the following CASs: CAS 03-04-02, Area 3 Subdock Septic Tank CAS 03-59-05, Area 3 Subdock Cesspool CAS 12-59-01, Drilling/Welding Shop Septic Tanks CAS 12-60-01, Drilling/Welding Shop Outfalls Site characterization activities were performed in 2007, and the results are presented in Appendix A of the CAU 563 Corrective Action Decision Document.more » The scope of work required to implement the recommended closure alternatives is summarized below. CAS 03-04-02, Area 3 Subdock Septic Tank, contains no contaminants of concern (COCs) above action levels. No further action is required for this site; however, as a best management practice (BMP), all aboveground features (e.g., riser pipes and bumper posts) will be removed, the septic tank will be removed, and all open pipe ends will be sealed with grout. CAS 03-59-05, Area 3 Subdock Cesspool, contains no COCs above action levels. No further action is required for this site; however, as a BMP, all aboveground features (e.g., riser pipes and bumper posts) will be removed, the cesspool will be abandoned by filling it with sand or native soil, and all open pipe ends will be sealed with grout. CAS 12-59-01, Drilling/Welding Shop Septic Tanks, will be clean closed by excavating approximately 4 cubic yards (yd3) of arsenic- and chromium-impacted soil. In addition, as a BMP, the liquid in the South Tank will be removed, the North Tank will be removed or filled with grout and left in place, the South Tank will be filled with grout and left in place, all open pipe ends will be sealed with grout or similar material, approximately 10 yd3 of chlordane-impacted soil will be excavated, and debris within the CAS boundary will be removed. CAS 12-60-01, Drilling/Welding Shop Outfalls, contains no COCs above action levels. No further action is required for this site; however, as a BMP, three drain pipe openings will be sealed with grout.« less

  8. TANKS 18 AND 19-F STRUCTURAL FLOWABLE GROUT FILL MATERIAL EVALUATION AND RECOMMENDATIONS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stefanko, D.; Langton, C.

    2011-11-01

    Cementitious grout will be used to close Tanks 18-F and 19-F. The functions of the grout are to: (1) physically stabilize the final landfill by filling the empty volume in the tanks with a non compressible material; (2) provide a barrier for inadvertent intrusion into the tank; (3) reduce contaminant mobility by (a) limiting the hydraulic conductivity of the closed tank and (b) reducing contact between the residual waste and infiltrating water; and (4) providing an alkaline, chemically reducing environment in the closed tank to control speciation and solubility of selected radionuclides. The objective of this work was to identifymore » a single (all-in-one) grout to stabilize and isolate the residual radionuclides in the tank, provide structural stability of the closed tank and serve as an inadvertent intruder barrier. This work was requested by V. A. Chander, High Level Waste (HLW) Tank Engineering, in HLW-TTR-2011-008. The complete task scope is provided in the Task Technical and QA Plan, SRNL-RP-2011-00587 Revision 0. The specific objectives of this task were to: (1) Identify new admixtures and dosages for formulating a zero bleed flowable tank fill material selected by HLW Tank Closure Project personnel based on earlier tank fill studies performed in 2007. The chemical admixtures used for adjusting the flow properties needed to be updated because the original admixture products are no longer available. Also, the sources of cement and fly ash have changed, and Portland cements currently available contain up to 5 wt. % limestone (calcium carbonate). (2) Prepare and evaluate the placement, compressive strength, and thermal properties of the selected formulation with new admixture dosages. (3) Identify opportunities for improving the mix selected by HLW Closure Project personnel and prepare and evaluate two potentially improved zero bleed flowable fill design concepts; one based on the reactor fill grout and the other based on a shrinkage compensating flowable fill mix design. (4) Prepare samples for hydraulic property measurements for comparison to the values in the F and H- Tank Farm Performance Assessments (PAs). (5) Identify a grout mix for the Tanks 18-F and 19-F Grout Procurement Specification [Forty, 2011 a, b, c]. Results for two flowable zero bleed structural fill concepts containing 3/8 inch gravel (70070 Series and LP-8 Series) and a sand only mix (SO Series) are provided in this report. Tank Farm Engineering and SRNL Project Management selected the 70070 mix as the base case for inclusion in Revision 0 of the Tanks 18-F and 19-F grout procurement specification [Forty 2011 a] and requested admixture recommendations and property confirmation for this formulation [Forty, 2011 b]. Lower cementitious paste mixes were formulated because the 70070 mix is over designed with respect to strength and generates more heat from hydration reactions than is desirable for mass pour application. Work was also initiated on a modification of the recommended mix which included shrinkage compensation to mitigate fast pathways caused by shrinkage cracking and poor physical bonding to the tank and ancillary equipment. Testing of this option was postponed to FY12.« less

  9. In-situ, time resolved monitoring of uranium in BFS:OPC grout. Part 2: Corrosion in water.

    PubMed

    Stitt, C A; Paraskevoulakos, C; Banos, A; Harker, N J; Hallam, K R; Pullin, H; Davenport, A; Street, S; Scott, T B

    2018-06-18

    To reflect potential conditions in a geological disposal facility, uranium was encapsulated in grout and submersed in de-ionised water for time periods between 2-47 weeks. Synchrotron X-ray Powder Diffraction and X-ray Tomography were used to identify the dominant corrosion products and measure their dimensions. Uranium dioxide was observed as the dominant corrosion product and time dependent thickness measurements were used to calculate oxidation rates. The effectiveness of physical and chemical grout properties to uranium corrosion and mobilisation is discussed and Inductively Coupled Plasma Mass Spectrometry was used to measure 238 U (aq) content in the residual water of several samples.

  10. TANK 18-F AND 19-F TANK FILL GROUT SCALE UP TEST SUMMARY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stefanko, D.; Langton, C.

    2012-01-03

    High-level waste (HLW) tanks 18-F and 19-F have been isolated from FTF facilities. To complete operational closure the tanks will be filled with grout for the purpose of: (1) physically stabilizing the tanks, (2) limiting/eliminating vertical pathways to residual waste, (3) entombing waste removal equipment, (4) discouraging future intrusion, and (5) providing an alkaline, chemical reducing environment within the closure boundary to control speciation and solubility of select radionuclides. This report documents the results of a four cubic yard bulk fill scale up test on the grout formulation recommended for filling Tanks 18-F and 19-F. Details of the scale upmore » test are provided in a Test Plan. The work was authorized under a Technical Task Request (TTR), HLE-TTR-2011-008, and was performed according to Task Technical and Quality Assurance Plan (TTQAP), SRNL-RP-2011-00587. The bulk fill scale up test described in this report was intended to demonstrate proportioning, mixing, and transportation, of material produced in a full scale ready mix concrete batch plant. In addition, the material produced for the scale up test was characterized with respect to fresh properties, thermal properties, and compressive strength as a function of curing time.« less

  11. Antenna grout replacement system

    NASA Technical Reports Server (NTRS)

    Mcclung, C. E. (Inventor)

    1983-01-01

    An epoxy grout suitable for use in mounting and positioning bearing runner plates used in hydrostatic bearing assemblies for rotatably mounting large radio telescope structures to stationary support pedestals is described. The epoxy grout may be used in original mountings or may be used as part of a replacement system for repairing cavities in existing grout resulting from grout deterioration. The epoxy grout has a relatively short work life and cure time even in the presence of hydraulic oil. The epoxy grout cures without shrinking or sagging to form a grout which is sufficiently strong and durable to provide a grout especially well suited for use under the high pressure loading and close tolerance requirements of large hydrostatic bearing assemblies.

  12. Use of Site Characterization and Analysis Penetrometer System at the Walnut Creek Watershed, Ames, Iowa

    DTIC Science & Technology

    1993-08-01

    grout is pumped through a central tube in the push rod cable and exits through the probe tip. Retraction grouting (as the rod is withdrawn through the...soil) with a microfine Portland cement grout is normally utilized for all projects; however, subfreezing weather mandated that post - retraction grouting...ELECTRODES (4) P2 RESISTIVITY C2 MODULE GROUTING TUBES (2) 24 IN(61 CM) Grout Injector -- 1.4 IN(3.57 CM) o.D. 0" RINGS GROUTING CONE SLEEVE FRICTION

  13. Research status and future trends on surface pre-grouting technology in reforming wall rock of vertical shafts in coal mines in China

    NASA Astrophysics Data System (ADS)

    Wang, Hua

    2018-02-01

    In the mine construction, the surface pre-grouting technology is an important method to prevent water blast in excavation process of vertical shaft when the shaft must pass through the thick, water-rich and high water-pressure bedrock aquifer. It has been nearly 60 years since the technology was used to reform wall rock of vertical shaft in coal mine in China for the first time, and the existing technology can basically meet the needs of constructing 1000m deep vertical shaft. Firstly, the article introduces that in view of Magg’s spherical seepage theory and Karol’s spherical seepage theory, Chinese scholars found that the diffusion of grout from borehole into the surrounding strata in horizontal direction is irregular through a lot of research and engineering practice of using the surface pre-grouting technology to reform wall rock of vertical shafts, and put forward the selecting principles of grout’s effective diffusion radius in one grouting engineering; Secondly, according to the shape of the grouting boreholes, surface pre-grouting technology of vertical shaft is divided into two stages: vertical borehole stage and S-type borehole stage. Thirdly, the development status of grouting materials and grouting equipment for the technology is introduced. Fourthly, grouting mode, stage height and pressure of the technology are introduced. Finally, it points out that with the increasing depth of coal mining in China, the technology of reforming wall rock of 1000~2000m deep vertical shafts will face many problems, such as grouting theory, grouting equipment, grouting finishing standard, testing and evaluation of grouting effect, and so on. And it put forward a preliminary approach to solving these problems. This paper points out future research directions of the surface pre-grouting technology in China.

  14. Thermally conductive cementitious grout for geothermal heat pump systems

    DOEpatents

    Allan, Marita

    2001-01-01

    A thermally conductive cement-sand grout for use with a geothermal heat pump system. The cement sand grout contains cement, silica sand, a superplasticizer, water and optionally bentonite. The present invention also includes a method of filling boreholes used for geothermal heat pump systems with the thermally conductive cement-sand grout. The cement-sand grout has improved thermal conductivity over neat cement and bentonite grouts, which allows shallower bore holes to be used to provide an equivalent heat transfer capacity. In addition, the cement-sand grouts of the present invention also provide improved bond strengths and decreased permeabilities. The cement-sand grouts can also contain blast furnace slag, fly ash, a thermoplastic air entraining agent, latex, a shrinkage reducing admixture, calcium oxide and combinations thereof.

  15. Nuclear waste viewed in a new light; a synchrotron study of uranium encapsulated in grout.

    PubMed

    Stitt, C A; Hart, M; Harker, N J; Hallam, K R; MacFarlane, J; Banos, A; Paraskevoulakos, C; Butcher, E; Padovani, C; Scott, T B

    2015-03-21

    How do you characterise the contents of a sealed nuclear waste package without breaking it open? This question is important when the contained corrosion products are potentially reactive with air and radioactive. Synchrotron X-rays have been used to perform micro-scale in-situ observation and characterisation of uranium encapsulated in grout; a simulation for a typical intermediate level waste storage packet. X-ray tomography and X-ray powder diffraction generated both qualitative and quantitative data from a grout-encapsulated uranium sample before, and after, deliberately constrained H2 corrosion. Tomographic reconstructions provided a means of assessing the extent, rates and character of the corrosion reactions by comparing the relative densities between the materials and the volume of reaction products. The oxidation of uranium in grout was found to follow the anoxic U+H2O oxidation regime, and the pore network within the grout was observed to influence the growth of uranium hydride sites across the metal surface. Powder diffraction analysis identified the corrosion products as UO2 and UH3, and permitted measurement of corrosion-induced strain. Together, X-ray tomography and diffraction provide means of accurately determining the types and extent of uranium corrosion occurring, thereby offering a future tool for isolating and studying the reactions occurring in real full-scale waste package systems. Copyright © 2014 Elsevier B.V. All rights reserved.

  16. Rheological Characteristics of Cement Grout and its Effect on Mechanical Properties of a Rock Fracture

    NASA Astrophysics Data System (ADS)

    Liu, Quansheng; Lei, Guangfeng; Peng, Xingxin; Lu, Chaobo; Wei, Lai

    2018-02-01

    Grouting reinforcement, which has an obvious strengthening effect on fractured rock mass, has been widely used in various fields in geotechnical engineering. The rheological properties of grout will greatly affect its diffusion radius in rock fractures, and the water-cement ratio is an important factor in determining the grouting flow patterns. The relationship between shear stress and shear rate which could reflect the grout rheological properties, the effects of water-cement ratio, and temperature on the rheological properties of grouting was studied in the laboratory. Besides, a new method for producing fractured rock specimens was proposed and solved the problem of producing natural fractured rock specimens. To investigate the influences of grouting on mechanical properties of a rock fracture, the fractured rock specimens made using the new method were reinforced by grouting on the independent designed grouting platform, and then normal and tangential mechanical tests were carried out on fractured rock specimens. The results showed that the mechanical properties of fractured rock mass are significantly improved by grouting, the peak shear strength and residual strength of rock fractures are greatly improved, and the resistance to deformation is enhanced after grouting. Normal forces affect the tangential behavior of the rock fracture, and the tangential stress strength increases with normal forces. The strength and stability of fractured rock mass are increased by grouting reinforcement.

  17. Coupled Viscous Fluid Flow and Joint Deformation Analysis for Grout Injection in a Rock Joint

    NASA Astrophysics Data System (ADS)

    Kim, Hyung-Mok; Lee, Jong-Won; Yazdani, Mahmoud; Tohidi, Elham; Nejati, Hamid Reza; Park, Eui-Seob

    2018-02-01

    Fluid flow modeling is a major area of interest within the field of rock mechanics. The main objective of this study is to gain insight into the performance of grout injection inside jointed rock masses by numerical modeling of grout flow through a single rock joint. Grout flow has been widely simulated using non-Newtonian Bingham fluid characterized by two main parameters of dynamic viscosity and shear yield strength both of which are time dependent. The increasing value of these properties with injection time will apparently affect the parameters representing the grouting performance including grout penetration length and volumetric injection rate. In addition, through hydromechanical coupling a mutual influence between the injection pressure from the one side and the joint opening/closing behavior and the aperture profile variation on the other side is anticipated. This is capable of producing a considerable impact on grout spread within the rock joints. In this study based on the Bingham fluid model, a series of numerical analysis has been conducted using UDEC to simulate the flow of viscous grout in a single rock joint with smooth parallel surfaces. In these analyses, the time-dependent evolution of the grout fluid properties and the hydromechanical coupling have been considered to investigate their impact on grouting performance. In order to verify the validity of these simulations, the results of analyses including the grout penetration length and the injection flow rate were compared with a well-known analytical solution which is available for the simple case of constant grout properties and non-coupled hydraulic analysis. The comparison demonstrated that the grout penetration length can be overestimated when the time-dependent hardening of grout material is not considered. Moreover, due to the HM coupling, it was shown that the joint opening induced by injection pressure may have a considerable increasing impression on the values of penetration length and injected grout volume.

  18. WASTE SOLIDIFICATION BUILDING BENCH SCALE HIGH ACTIVITY WASTE SIMULANT VARIABILITY STUDY FY2008

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hansen, E; Timothy Jones, T; Tommy Edwards, T

    2009-03-20

    The primary objective of this task was to perform a variability study of the high activity waste (HAW) acidic feed to determine the impact of feed variability on the quality of the final grout and on the mixability of the salt solution into the dry powders. The HAW acidic feeds were processed through the neutralization/pH process, targeting a final pH of 12. These fluids were then blended with the dry materials to make the final waste forms. A secondary objective was to determine if elemental substitution for cost prohibitive or toxic elements in the simulant affects the mixing response, thusmore » providing a more economical simulant for use in full scale tests. Though not an objective, the HAW simulant used in the full scale tests was also tested and compared to the results from this task. A statistically designed test matrix was developed based on the maximum molarity inputs used to make the acidic solutions. The maximum molarity inputs were: 7.39 HNO{sub 3}, 0.11618 gallium, 0.5423 silver, and 1.1032 'other' metals based on their NO{sub 3}{sup -} contribution. Substitution of the elements aluminum for gallium and copper for silver was also considered in this test matrix, resulting in a total of 40 tests. During the NaOH addition, the neutralization/pH adjustment process was controlled to a maximum temperature of 60 C. The neutralized/pH adjusted simulants were blended with Portland cement and zircon flour at a water to cement mass ratio of 0.30. The mass ratio of zircon flour to Portland cement was 1/12. The grout was made using a Hobart N-50 mixer running at low speed for two minutes to incorporate and properly wet the dry solids with liquid and at medium speed for five minutes for mixing. The resulting fresh grout was measured for three consecutive yield stress measurements. The cured grout was measured for set, bleed, and density. Given the conditions of preparing the grout in this task, all of the grouts were visually well mixed prior to preparing the grouts for measurements. All of the cured grouts were measured for bleed and set. All of the cured grouts satisfied the bleed and set requirements, where no bleed water was observed on any of the grout samples after one day and all had set within 3 days of curing. This data indicates, for a well mixed product, bleed and set requirement are satisfied for the range of acidic feeds tested in this task. The yield stress measurements provide both an indication on the mixability of the salt solution with dry materials and an indication of how quickly the grout is starting to form structure. The inability to properly mix these two streams into a well mixed grout product will lead to a non-homogeneous mixture that will impact product quality. Product quality issues could be unmixed regions of dry material and hot spots having high concentrations of americium 241. Mixes that were more difficult to incorporate typically resulted in grouts with higher yield stresses. The mixability from these tests will provide Waste Solidification Building (WSB) an indication of which grouts will be more challenging to mix. The first yield stress measurements were statistically compared to a list of variables, specifically the batched chemicals used to make the acidic solutions. The first yield stress was also compared to the physical properties of the acidic solutions, physical and pH properties of the neutralized/pH adjusted solutions, and chemical and physical properties of the grout.« less

  19. Monitoring of Grouting Compactness in a Post-Tensioning Tendon Duct Using Piezoceramic Transducers

    PubMed Central

    Jiang, Tianyong; Kong, Qingzhao; Wang, Wenxi; Huo, Linsheng; Song, Gangbing

    2016-01-01

    A post-tensioning tendon duct filled with grout can effectively prevent corrosion of the reinforcement, maintain bonding behavior between the reinforcement and concrete, and enhance the load bearing capacity of concrete structures. In practice, grouting of the post-tensioning tendon ducts always causes quality problems, which may reduce structural integrity and service life, and even cause accidents. However, monitoring of the grouting compactness is still a challenge due to the invisibility of the grout in the duct during the grouting process. This paper presents a stress wave-based active sensing approach using piezoceramic transducers to monitor the grouting compactness in real time. A segment of a commercial tendon duct was used as research object in this study. One lead zirconate titanate (PZT) piezoceramic transducer with marble protection, called a smart aggregate (SA), was bonded on the tendon and installed in the tendon duct. Two PZT patch sensors were mounted on the top outside surface of the duct, and one PZT patch sensor was bonded on the bottom outside surface of the tendon duct. In the active sensing approach, the SA was used as an actuator to generate a stress wave and the PZT sensors were utilized to detect the wave response. Cement or grout in the duct functions as a wave conduit, which can propagate the stress wave. If the cement or grout is not fully filled in the tendon duct, the top PZT sensors cannot receive much stress wave energy. The experimental procedures simulated four stages during the grout pouring process, which includes empty status, half grouting, 90% grouting, and full grouting of the duct. Experimental results show that the bottom PZT sensor can detect the signal when the grout level increases towards 50%, when a conduit between the SA and PZT sensor is formed. The top PZT sensors cannot receive any signal until the grout process is completely finished. The wavelet packet-based energy analysis was adopted in this research to compute the total signal energy received by PZT sensors. Experimental results show that the energy levels of the PZT sensors can reflect the degree of grouting compactness in the duct. The proposed method has the potential to be implemented to monitor the tendon duct grouting compactness of the reinforced concrete structures with post tensioning. PMID:27556470

  20. Comparing the shear strength of grouted fractures: conventional methods vs biomineralisation

    NASA Astrophysics Data System (ADS)

    El Mountassir, G.; Tobler, D. J.; Moir, H.; Lunn, R. J.; Phoenix, V. R.

    2011-12-01

    For many engineering applications, such as geological disposal of nuclear waste, underground railways etc., it is necessary to limit fluid flow through fractures. The particle size of conventional cementitious grouts limits the size of fractures into which they can penetrate. To address this issue increasingly microfine and ultrafine cement grouts are becoming commercially available. Despite this the radius of penetration remains dependent on the grout viscosity alongside injection pressure, pumping rate, grout setting time and grout cohesion. As such lower viscosity aqueous solutions may have a greater radius of penetration potentially requiring fewer injection points. In addition cementitious grouts typically undergo volumetric shrinkage during setting. In many applications this change in volume may not be of particular importance but in others where a very low hydraulic conductivity is a critical design criterion, as in nuclear waste repositories, this reduction in volume may be highly significant. This study investigates the use of microbially induced carbonate precipitation (MCP) as a technique for grouting fine aperture rock fractures. Artificial fractures were created in granite cores and were subjected to conventional cementitious grouting methods and MCP. Following treatment the hydraulic and mechanical properties of the grouted fractures were investigated. The mechanical properties of grouts after setting is not usually considered to be a significant issue, but in applications which consider much longer timescales (100,000 years) grouts which result in fractures with improved strength and lower hydraulic conductivity are likely to be preferred.

  1. Development of a polymetric grout for the hydrostatic bearing at DSS 14

    NASA Technical Reports Server (NTRS)

    Mcclung, C. E.; Schwendeman, J. L.; Ball, G. L., III; Jenkins, G. H.; Casperson, R. D.; Gale, G. P.; Riewe, A. A.

    1981-01-01

    Results of an investigation into the causes of the deterioration and premature failure of the grout under the hydrostatic bearing runner at DSS 14 are reported. Generic types of materials were screened and tested to find a grout material more resistive to the causes of grout failure. Emphasis was placed on the physical properties, strength, modulus of elasticity, and resistance to erosion and chemical attack by oil and unique requirements imposed by each material for mixing, placing, compacting, and cooling. The polymetric grout developed to replace the dry grout is described.

  2. Design and Control of Chemical Grouting : Volume 3 - Engineering Practice

    DOT National Transportation Integrated Search

    1983-04-01

    Recent improvements in the engineering practice of chemical grouting have provided increased confidence in this method of ground modification. Designers can significantly improve the success of chemical grouting by defining their grouting program obj...

  3. Method for constructing a lined underground cavity by underreaming, grouting, and boring through the grouting

    DOEpatents

    Johnson, W.H.

    1971-02-02

    A method is described for constructing a lined underground cavity. The process includes the steps of securing a casing in a borehole by grouting, underreaming the casing, filling the underreamed region with additional grouting, and then drilling through and underreaming the added grouting, thereby forming a room having a lining formed of the grouting. By using a structurally strong grouting that is impervious to water, the resulting room is waterproof and is suitable for on-site storage of an atomic device and its associated equipment prior to an underground atomic event. Such cavities also have other uses; for example, the cavities may be made very deep and used for storage of various fluids such as natural gas storage. (5 claims)

  4. EARTHSAWtm IN-SITU CONTAINMENT OF PITS AND TRENCHES

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ernest E. Carter, P.E.

    2002-09-20

    EarthSaw{trademark} is a proposed technology for construction of uniform high quality barriers under and around pits and trenches containing buried radioactive waste without excavating or disturbing the waste. The method works by digging a deep vertical trench around the perimeter of a site, filling that trench with high specific gravity grout sealant, and then cutting a horizontal bottom pathway at the base of the trench with a simple cable saw mechanism. The severed block of earth becomes buoyant in the grout and floats on a thick layer of grout, which then cures into an impermeable barrier. The ''Interim Report onmore » task 1 and 2'' which is incorporated into this report as appendix A, provided theoretical derivations, field validation of formulas, a detailed quantitative engineering description of the technique, engineering drawings of the hardware, and a computer model of how the process would perform in a wide variety of soil conditions common to DOE waste burial sites. The accomplishments of task 1 and 2 are also summarized herein Task 3 work product provides a comprehensive field test plan in Appendix B and a health and safety plan in Appendix C and proposal for a field-scale demonstration of the EarthSaw barrier technology. The final report on the subcontracted stress analysis is provided in Appendix D. A copy of the unified computer model is provided as individual non-functional images of each sheet of the spreadsheet and separately as a Microsoft Excel 2000 file.« less

  5. Dimensional Stability of Grout-like Materials Used in Field-Cast Connections

    DOT National Transportation Integrated Search

    2016-12-01

    The wide use of grouts and grout-like materials in the construction industry is seen in applications such as joint sealing, structural repair, and connections in prefabricated bridge elements (PBEs). Currently, different types of grouts are available...

  6. Evaluation of grout behind the lining of shield tunnels using ground-penetrating radar in the Shanghai Metro Line, China

    NASA Astrophysics Data System (ADS)

    Xie, Xiongyao; Liu, Yujian; Huang, Hongwei; Du, Jun; Zhang, Fengshou; Liu, Lanbo

    2007-09-01

    For shield tunnelling construction in soft soil areas, the coverage uniformity and quality of consolidation of the injected grout mortar behind the prefabricated tunnel segment is the main concern for tunnel safety and ground settlement. In this paper, ground-penetrating radar (GPR) was applied to evaluate the grout behind the tunnel lining segments in Shanghai, China. The dielectric permittivity of the grout material in Shanghai Metro tunnelling construction was measured in the laboratory. Combining physical modelling results with finite different time domain numerical modelling results, we suggest that the antenna with frequency 200 MHz is well suited to penetrate the reinforced steel bar network of the tunnel lining segment and testing grout patterns behind the segment. The electromagnetic velocity of the grout behind the segment of the tunnel is 0.1 m ns-1 by the analysis of field common-middle point data. A wave-translated method was put forward to process the GPR images. Furthermore, combining the information acquired by GPR with experience data, a GPR non-destructive test standard for the grout mortar evaluation in Shanghai Metro tunnel construction was brought forward. The grout behind the tunnel lining segment is classified into three types: uncompensated grout mortar with a thickness less than 10 cm, normal grout mortar with a thickness between 10 cm and 30 cm and overcompensated grout mortar, which is more than 30 cm thick. The classified method is easily put into practice.

  7. GROUT-CONCRETE INTERFACE BOND PERFORMANCE: EFFECT OF INTERFACE MOISTURE ON THE TENSILE BOND STRENGTH AND GROUT MICROSTRUCTURE.

    PubMed

    De la Varga, I; Muñoz, J F; Bentz, D P; Spragg, R P; Stutzman, P E; Graybeal, B A

    2018-05-01

    Bond between two cementitious materials is crucial in applications such as repairs, overlays, and connections of prefabricated bridge elements (PBEs), to name just a few. It is the latter that has special interest to the authors of this paper. After performing a dimensional stability study on grout-like materials commonly used as connections between PBEs, it was observed that the so-called 'non-shrink' cementitious grouts showed a considerable amount of early-age shrinkage. This might have negative effects on the integrity of the structure, due not only to the grout material's early degradation, but also to a possible loss of bond between the grout and the prefabricated concrete element. Many factors affect the bond strength between two cementitious materials (e.g., grout-concrete), the presence of moisture at the existing concrete substrate surface being one of them. In this regard, pre-moistening the concrete substrate surface prior to the application of the grout material is sometimes recommended for bond enhancement. This topic has been the focus of numerous research studies in the past; however, there is still controversy among practitioners on the real benefits that this practice might provide. This paper evaluates the tensile bond performance of two non-shrink cementitious grouts applied to the exposed aggregate surface of a concrete substrate, and how the supply of moisture at the grout-concrete interface affects the bond strength. "Pull-off" bond results show increased tensile bond strength when the concrete surface is pre-moistened. Reasons to explain the observed increased bond strength are given after a careful microstructural analysis of the grout-concrete interface. Interfaces where sufficient moisture is provided to the concrete substrate such that moisture movement from the grout is prevented show reduced porosity and increased hydration on the grout side of the interface, which is thought to directly contribute to the increased tensile bond strength.

  8. Methods and system for subsurface stabilization using jet grouting

    DOEpatents

    Loomis, Guy G.; Weidner, Jerry R.; Farnsworth, Richard K.; Gardner, Bradley M.; Jessmore, James J.

    1999-01-01

    Methods and systems are provided for stabilizing a subsurface area such as a buried waste pit for either long term storage, or interim storage and retrieval. A plurality of holes are drilled into the subsurface area with a high pressure drilling system provided with a drill stem having jet grouting nozzles. A grouting material is injected at high pressure through the jet grouting nozzles into a formed hole while the drill stem is withdrawn from the hole at a predetermined rate of rotation and translation. A grout-filled column is thereby formed with minimal grout returns, which when overlapped with other adjacent grout-filled columns encapsulates and binds the entire waste pit area to form a subsurface agglomeration or monolith of grout, soil, and waste. The formed monolith stabilizes the buried waste site against subsidence while simultaneously providing a barrier against contaminate migration. The stabilized monolith can be left permanently in place or can be retrieved if desired by using appropriate excavation equipment. The jet grouting technique can also be utilized in a pretreatment approach prior to in situ vitrification of a buried waste site. The waste encapsulation methods and systems are applicable to buried waste materials such as mixed waste, hazardous waste, or radioactive waste.

  9. Epoxy Grout With Silica Thickener

    NASA Technical Reports Server (NTRS)

    Mcclung, C. E.

    1984-01-01

    Grout cures quickly, even in presence of hydraulic oil. Grout is mixture of aggregate particles, finely-divided silica, epoxy resin, and triethylenetetramine curing agent, with mixture containing about 85 percent silica and aggregate particle sand 15 percent resin and curing agent. Silica is thickening agent and keeps grout from sagging.

  10. Experimental studies on the physico-mechanical properties of jet-grout columns in sandy and silty soils

    NASA Astrophysics Data System (ADS)

    Akin, Muge K.

    2016-04-01

    The term of ground improvement states to the modification of the engineering properties of soils. Jet-grouting is one of the grouting methods among various ground improvement techniques. During jet-grouting, different textures of columns can be obtained depending on the characteristics of surrounding subsoil as well as the adopted jet-grouting system for each site is variable. In addition to textural properties, strength and index parameters of jet-grout columns are highly affected by the adjacent soil. In this study, the physical and mechanical properties of jet-grout columns constructed at two different sites in silty and sandy soil conditions were determined by laboratory tests. A number of statistical relationships between physical and mechanical properties of soilcrete were established in this study in order to investigate the dependency of numerous variables. The relationship between qu and γd is more reliable for sandy soilcrete than that of silty columns considering the determination coefficients. Positive linear relationships between Vp and γd with significantly high determination coefficients were obtained for the jet-grout columns in silt and sand. The regression analyses indicate that the P-wave velocity is a very dominant parameter for the estimation of physical and mechanical properties of jet-grout columns and should be involved during the quality control of soilcrete material despite the intensive use of uniaxial compressive strength test. Besides, it is concluded that the dry unit weight of jet-grout column is a good indicator of the efficiency of employed operational parameters during jet-grouting.

  11. 75 FR 9590 - Environmental Management Site-Specific Advisory Board, Idaho National Laboratory

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-03

    ... current agenda): Progress to Cleanup. InSitu Grouting--Work Plan Follow-up Discussion. Experimental... meeting be announced in the Federal Register. DATES: Tuesday, March 16, 2010, 8 a.m.-5 p.m. Opportunities... in the areas of environmental restoration, waste management, and related activities. Tentative Topics...

  12. Tank Closure Progress at the Department of Energy's Idaho National Engineering Laboratory Tank Farm Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Quigley, K.D.; Butterworth, St.W.; Lockie, K.A.

    2008-07-01

    Significant progress has been made at the U.S. Department of Energy (DOE) Idaho National Laboratory (INL) to empty, clean and close radioactive liquid waste storage tanks at the Idaho Nuclear Technology and Engineering Center (INTEC) Tank Farm Facility (TFF). The TFF includes eleven 1,135.6-kL (300,000-gal) underground stainless steel storage tanks and four smaller, 113.5-kL (30,000-gal) stainless steel tanks, along with tank vaults, interconnecting piping, and ancillary equipment. The TFF tanks have historically been used to store a variety of radioactive liquid waste, including wastes associated with past spent nuclear fuel reprocessing. Although four of the large storage tanks remain inmore » use for waste storage, the other seven 1,135.6-kL (300,000-gal) tanks and the four 113.5-kL (30,000-gal) tanks have been emptied of waste, cleaned and filled with grout. A water spray cleaning system was developed and deployed to clean internal tank surfaces and remove remaining tank wastes. The cleaning system was effective in removing all but a very small volume of solid residual waste particles. Recent issuance of an Amended Record of Decision (ROD) in accordance with the National Environmental Policy Act, and a Waste Determination complying with Section 3116 of the Ronald W. Reagan National Defense Authorization Act (NDAA) for Fiscal Year 2005, has allowed commencement of grouting activities on the cleaned tanks. The first three 113.5-kL (30,000-gal) tanks were grouted in the Fall of 2006 and the fourth tank and the seven 1,135.6-kL (300,000-gal) tanks were filled with grout in 2007 to provide long-term stability. It is currently planned that associated tank valve boxes and interconnecting piping, will be stabilized with grout as early as 2008. (authors)« less

  13. Summary of Group Development and Testing for Single Shell Tank Closure at Hanford

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harbour, John, R.

    2005-04-28

    This report is a summary of the bench-scale and large scale experimental studies performed by Savannah River National Laboratory for CH2M HILL to develop grout design mixes for possible use in producing fill materials as a part of Tank Closure of the Single-Shell Tanks at Hanford. The grout development data provided in this report demonstrates that these design mixes will produce fill materials that are ready for use in Hanford single shell tank closure. The purpose of this report is to assess the ability of the proposed grout specifications to meet the current requirements for successful single shell tank closuremore » which will include the contracting of services for construction and operation of a grout batch plant. The research and field experience gained by SRNL in the closure of Tanks 17F and 20F at the Savannah River Site was leveraged into the grout development efforts for Hanford. It is concluded that the three Hanford grout design mixes provide fill materials that meet the current requirements for successful placement. This conclusion is based on the completion of recommended testing using Hanford area materials by the operators of the grout batch plant. This report summarizes the regulatory drivers and the requirements for grout mixes as tank fill material. It is these requirements for both fresh and cured grout properties that drove the development of the grout formulations for the stabilization, structural and capping layers.« less

  14. Brief overview of the various families of grouts and their aplications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nandts, A.

    1989-04-01

    It is difficult to maintain an up-to-date overview of all the grouts presently used on the international market. Better grouts are continuously developed and more formulators are making their appearance. Consequently, it is difficult to clearly define all of the products in the industry. This topic has been the subject of numerous papers and textbooks. Most authors, however, only focus on their fields of interest: applications in geotechnical, or rehabilitation, or seepage control in civil engineering, oil or mining industry. There has been a limited transfer of technology from one field to the other because of the enormous differences inmore » magnitude, site conditions and consequently the application techniques. The tools an engineer has are: his expertise in grouting and engineering background, equipment available or to be designed or modified to carry out a particular job, relevant data available from other sciences, and products with a variety of characteristics. This paper concentrates on product selection. The most suitable product for a particular project requires a good understanding of the general chemical and mechanical characteristics of the grout. The grouts have been classified into four categories for the purpose of this paper. There may be other methods of classification; however, this is only an attempt to help the industry with the selection of the most suitable grout for a given application. The four categories are: suspension grouts, chemical grouts, hot melts, and precipitation grouts. 1 fig.« less

  15. Environmental Assessment of Selected Cone Penetrometer Grouts and a Tracer

    DTIC Science & Technology

    1993-08-01

    Bentonite Clay ............ ...................... A2 Attapulgite Clay ................................... A22 Microfine Portland Cement...and the tracer are a. Bentonite clay. b. Attapulgite clay. c. Microfine portland cement. d. Joosten grout (calcium silicate grout). e. Urethane grout. f...Inc., on an attapulgite clay product (trade name: Zeogel). " Microfine portland cement. Information was obtained for two micro- fine portland cements

  16. Micaceous Soil Strength And Permeability Improvement Induced By Microbacteria From Vegetable Waste

    NASA Astrophysics Data System (ADS)

    Omar, R. C.; Roslan, R.; Baharuddin, I. N. Z.; Hanafiah, M. I. M.

    2016-11-01

    Green technology method using vegetable waste are introduced in this paper for improvement of phyllite residual soil from UNITEN, Campus. Residual soil from phyllite are known as micaceous soils and it give problem in managing the stability of the slope especially in wet and extensively dry seasons. Micaceous soil are collected using tube sampler technique and mixed with liquid contain microorganism from fermented vegetable waste name as vege-grout to form remolded sample. The remolded sample are classify as 15.0%, 17.5%, 20.00% and 22.5% based on different incremental percentages of vege-grout. The curing time for the sample are 7, 14, 21, 28, and 35 days before the tests were conducted. Observation of the effect of treatment shows 20.0% of liquid contain Bacillus pasteurii and Bacillus Subtilis with 21 days curing time is the optimum value in strengthening the soil and improve the permeability.

  17. 75 FR 346 - Environmental Management Site-Specific Advisory Board, Idaho National Laboratory

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ... current agenda): Progress to Cleanup. InSitu Grouting--Draft Remedial Design and Remedial Action Work Plan... this meeting be announced in the Federal Register. DATES: Wednesday, January 20, 2010, 8 a.m.-5 p.m... in the areas of environmental restoration, waste management, and related activities. Tentative Topics...

  18. Idaho Nuclear Technology and Engineering Center Low-Activity Waste Process Technology Program, FY-98 Status Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Herbst, A.K.; Rogers, A.Z.; McCray, J.A.

    The Low-Activity Waste Process Technology Program at the Idaho Nuclear Technology and Engineering Center (INTEC) anticipates that large volumes of low-level/low-activity wastes will need to be grouted prior to near-surface disposal. During fiscal year 1998, three grout formulations were studied for low-activity wastes derived from INTEC liquid sodium-bearing waste. Compressive strength and leach results are presented for phosphate bonding cement, acidic grout, and alkaline grout formulations. In an additional study, grout formulations are recommended for stabilization of the INTEC underground storage tank residual heels.

  19. In Situ Grouting of Liquid Waste Disposal Trenches and Experimental Reactor Fuel Disposal Wells at Oak Ridge National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Ch.; Cange, J.; Lambert, R.

    In the early to mid-1960's, liquid low-level wastes (LLLW) generated at Oak Ridge National Laboratory were disposed of in specially-constructed, gravel-filled trenches within the Melton Valley watershed at the lab. The initial selected remedy for Trenches 5 and 7 was in situ vitrification; however, an amendment to the record of decision changed the remedy to in situ grouting of the trenches. The work was accomplished by filling the void space within the crushed stone section of each trench with cementitious grout. The contaminated soil surrounding the trenches (1-m perimeter) was then grouted with acrylamide grout. At the HRE fuel wells,more » a 1-m ring of soil surrounding the fuel wells was grouted with acrylamide. The results of the hydraulic conductivity tests ranged from 4.74 x 10{sup -6} to 3.60 x 10{sup -7} cm/sec, values that were well below the 1 x 10{sup -5} cm/sec design criterion. In summary: The ISG Project was conducted to decrease hydraulic conductivity and thereby decrease water flow and contaminate migration from the area of the trenches. The initial remedy for Trenches 5 and 7 in the Melton Valley ROD was for in situ vitrification of the trench matrix. The remedy was changed to in situ grouting of the trenches and HRE fuel wells through an amendment to the ROD after moisture was found in the trenches. The grouting of the trenches was accomplished by filling the void space within the crushed stone section of each trench with cementitious grout. The contaminated soil surrounding the trenches (1-m perimeter) was then grouted with acrylamide grout to further reduce water infiltration. Soil backfill above each of the seven HRE fuel wells was removed to a depth of approximately 1 m by augering, and the soils were replaced with a cement plug to prevent water infiltration from migrating down the original borehole. Soil surrounding the fuel wells was then grouted with acrylamide to ensure water infiltration through the HRE fuel wells is prevented. A summary of the quantities used is shown. After completion of grouting, in-situ hydraulic conductivities of the grouted materials were measured to verify attainment of the design objective. The areas were then covered with multi-layer caps as part of the MV hydrologic isolation project. (authors)« less

  20. Impact Of Standing Water On Saltstone Placement II - Hydraulic Conductivity Data

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cozzi, A. D.; Pickenheim, B. R.

    2012-12-06

    The amount of water present during placement and subsequent curing of saltstone has the potential to impact several properties important for grout quality. An active drain water system can remove residual standing water and expose the surface of the placed saltstone to air. Oxidation of the saltstone may result in an increase in the leachability of redox sensitive elements. A dry surface can lead to cracking, causing an increase in hydraulic conductivity. An inactive drain water system can allow standing water that generates unnecessary hydrostatic head on the vault walls. Standing water that cannot be removed via the drain systemmore » will be available for potential incorporation into subsequent grout placements. The objective of this work is to study the impact of standing water on grout quality pertaining to disposal units. A series of saltstone mixes was prepared and cured at ambient temperature to evaluate the impact of standing water on saltstone placement. The samples were managed to control drying effects on leachability by either exposing or capping the samples. The water to premix ratio was varied to represent a range of processing conditions. Samples were analyzed for density, leachability, and hydraulic conductivity. Report SRNL-STI-2012-00546 was issued detailing the experimental procedure, results, and conclusions related to density and leachability. In the previous report, it was concluded that: density tends to increase toward the bottom of the samples. This effect is pronounced with excess bleed water; drying of the saltstone during curing leads to decreased Leachability Index (more leaching) for potassium, sodium, rhenium, nitrite, and nitrate; there is no noticeable effect on saltstone oxidation/leachability by changing the water to premix ratio (over the range studied), or by pouring into standing water (when tested up to 10 volume percent). The hydraulic conductivity data presented in this report show that samples cured exposed to the atmosphere had about three orders of magnitude higher hydraulic conductivity than any of the other samples. Considering these data, along with the results presented in the previous report, leads to the conclusion that small changes in water to premix ratio and the inclusion of up to 10 volume percent standing water should not be expected to have a detrimental effect on saltstone grout quality. The hydraulic conductivity results further demonstrate that curing in a moist environment is critical to maintaining saltstone quality.« less

  1. Development and application of new composite grouting material for sealing groundwater inflow and reinforcing wall rock in deep mine.

    PubMed

    Jinpeng, Zhang; Limin, Liu; Futao, Zhang; Junzhi, Cao

    2018-04-04

    With cement, bentonite, water glass, J85 accelerator, retarder and water as raw materials, a new composite grouting material used to seal groundwater inflow and reinforce wall rock in deep fractured rock mass was developed in this paper. Based on the reaction mechanism of raw material, the pumpable time, stone rate, initial setting time, plastic strength and unconfined compressive strength of multi-group proportion grouts were tested by orthogonal experiment. Then, the optimum proportion of composite grouting material was selected and applied to the grouting engineering for sealing groundwater inflow and reinforcing wall rock in mine shaft lining. The results show the mixing proportion of the maximum pumpable time, maximum stone rate and minimum initial setting time of grout are A K4 B K1 C K4 D K2 , A K3 B K1 C K1 D K4 and A K3 B K3 C K4 D K1 , respectively. The mixing proportion of the maximum plastic strength and unconfined compressive strength of grouts concretion bodies are A K1 B K1 C K1 D K3 and A K1 B K1 C K1 D K1 , respectively. Balanced the above 5 indicators overall and determined the optimum proportion of grouts: bentonite-cement ratio of 1.0, water-solid ratio of 3.5, accelerator content of 2.9% and retarder content of 1.45%. This new composite grouting material had good effect on the grouting engineering for sealing groundwater inflow and reinforcing wall rock in deep fractured rock mass.

  2. Engineering scale demonstration of a prospective Cast Stone process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cozzi, A.; Fowley, M.; Hansen, E.

    2014-09-30

    This report documents an engineering-scale demonstration with non-radioactive simulants that was performed at SRNL using the Scaled Continuous Processing Facility (SCPF) to fill an 8.5 ft container with simulated Cast Stone grout. The Cast Stone formulation was chosen from the previous screening tests. Legacy salt solution from previous Hanford salt waste testing was adjusted to correspond to the average composition generated from the Hanford Tank Waste Operation Simulator (HTWOS). The dry blend materials, ordinary portland cement (OPC), Class F fly ash, and ground granulated blast furnace slag (GGBFS or BFS), were obtained from Lafarge North America in Pasco, WA. Overmore » three days, the SCPF was used to fill a 1600 gallon container, staged outside the facility, with simulated Cast Stone grout. The container, staged outside the building approximately 60 ft from the SCPF, was instrumented with x-, y-, and z-axis thermocouples to monitor curing temperature. The container was also fitted with two formed core sampling vials. For the operation, the targeted grout production rate was 1.5 gpm. This required a salt solution flow rate of approximately 1 gpm and a premix feed rate of approximately 580 lb/h. During the final day of operation, the dry feed rate was increased to evaluate the ability of the system to handle increased throughput. Although non-steady state operational periods created free surface liquids, no bleed water was observed either before or after operations. The final surface slope at a fill height of 39.5 inches was 1-1.5 inches across the 8.5 foot diameter container, highest at the final fill point and lowest diametrically opposed to the fill point. During processing, grout was collected in cylindrical containers from both the mixer discharge and the discharge into the container. These samples were stored in a humid environment either in a closed box proximal to the container or inside the laboratory. Additional samples collected at these sampling points were analyzed for rheological properties and density. Both the rheological properties (plastic viscosity and yield strength) and density were consistent with previous and later SCPF runs.« less

  3. Effects of Coal Gangue on Cement Grouting Material Properties

    NASA Astrophysics Data System (ADS)

    Liu, J. Y.; Chen, H. X.

    2018-05-01

    The coal gangue is one of the most abundant industrial solid wastes and pollute source of air and water. The use of coal gangue in the production of cement grouting material comforms to the basic state policy of environment protection and the circular using of natural resources. Through coal gangue processing experiment, coal gangue cement grouting materials making test, properties detection of properties and theoretical analysis, the paper studied the effects of coal gangue on the properties of cement grouting materials. It is found that at the range of 600 to 700 °C, the fluidity and the compressive and flexural strengths of the cement grouting materials increase with the rising up of the calcination temperatures of coal gangue. The optimum calcination temperature is around 700 °C. The part substitution of cement by the calcined coal gangue in the cement grouting material will improve the mechanical properties of the cement grouting material, even thought it will decrease its fluidity. The best substitution amount of cement by coal gangue is about 30%. The fluidity and the long term strength of the ordinary silicate cement grouting material is obviously higher than that of the sulphoaluminate cement one as well as that of the silicate-sulphoaluminate complex cement one.

  4. Bio-grout based on microbially induced sand solidification by means of asparaginase activity

    PubMed Central

    Li, Mengmeng; Fu, Qing-Long; Zhang, Qiuzhuo; Achal, Varenyam; Kawasaki, Satoru

    2015-01-01

    Bio-grout, a new ground improvement method, has been recently developed to improve the mechanical properties, decrease the permeability of porous materials, reinforce or repair cementitious materials and modify the properties of soil or sand. Bio-grout production depends on microbially induced calcite precipitation (MICP), which is driven mainly by an enzyme, urease. However, urease-based MICP process produces excessive ammonia, in addition to secondary pollution generated by urea that is used as substrate in it. In the present study, we reported asparaginase-based MICP process for sand bio-grout development using Bacillus megaterium, and results were also compared with urease-based bio-grouts. The asparaginase activity led to significantly less ammonia production compared to urease without compromising with desired properties of a novel grout. The UCS of bio-grout was obtained at 980 kPa, while the permeability was decreased substantially. The mineralogical composition of precipitated substance was identified as calcite using XRD and the crystal morphology was observed under SEM. The mass percentage of calcite in bio-grout was calculated by thermogravimetric analysis and XCT verified calcite precipitation in it. The results confirmed that biocalcification by means of bacterial asparaginase is a potential solution for geotechnical problems. The asparaginase-based MICP process could be of wider acceptance in future. PMID:26525435

  5. Finite element Analysis of Semi-Grouting Sleeve Connection Member Based on ABAQUS

    NASA Astrophysics Data System (ADS)

    Bao, Longsheng; Fan, Qianyu; Wang, Ling

    2018-05-01

    This paper use investigates the force transfer mechanism and failure form of semi-grouting sleeve members under axial load, analyze the weak points of structural bearing capacity and verify the reliability of the connection of steel bars through finite element analysis software. The results show that adding the axial load to semi-grouting sleeve forms a 45°oblique compression zone, which help to transfer stress between reinforcement, grouting material and sleeve. Because the maximum stress of sleeve doesn’t reach its tensile resistance and the deformation of the sleeve is located at the junction of the grouting and the threaded section when the stress value of steel bars at each end of the semi-grouting sleeve reach its ultimate tensile strength, we conclude that the semi-grouting sleeve members can meet the construction quality requirements and be used to connect the steel bars at the joints of the assembled structures. It is necessary to avoid breaking down, since the deformation section will accumulate large plastic deformation during the processing of the sleeve.

  6. Design and Control of Chemical Grouting : Volume 1 - Construction Control

    DOT National Transportation Integrated Search

    1983-04-01

    This report presents the results of a laboratory and field research program investigating innovative method for design and control of chemical grouting in soils. Chemical grouting practice is reviewed and standard evaluation and measurement technique...

  7. Military Curriculum Materials for Vocational and Technical Education. Builders School, Ceramic Tile Setting 3-9.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. National Center for Research in Vocational Education.

    This course, for individualized or group instruction on ceramic tile setting, was developed from military sources for use in vocational education. The course provides students with skills in mortar preparation, surface preparation, tile layout planning, tile setting, tile cutting, and the grouting of tile joints. Both theory and shop assignments…

  8. Liquid Secondary Waste Grout Formulation and Waste Form Qualification

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Um, Wooyong; Williams, B. D.; Snyder, Michelle M. V.

    This report describes the results from liquid secondary waste (LSW) grout formulation and waste form qualification tests performed at Pacific Northwest National Laboratory (PNNL) for Washington River Protection Solutions (WRPS) to evaluate new formulations for preparing a grout waste form with high-sulfate secondary waste simulants and the release of key constituents from these grout monoliths. Specific objectives of the LSW grout formulation and waste form qualification tests described in this report focused on five activities: 1.preparing new formulations for the LSW grout waste form with high-sulfate LSW simulants and solid characterization of the cured LSW grout waste form; 2.conducting themore » U.S. Environmental Protection Agency (EPA) Method 1313 leach test (EPA 2012) on the grout prepared with the new formulations, which solidify sulfate-rich Hanford Tank Waste Treatment and Immobilization Plant (WTP) off-gas condensate secondary waste simulant, using deionized water (DIW); 3.conducting the EPA Method 1315 leach tests (EPA 2013) on the grout monoliths made with the new dry blend formulations and three LSW simulants (242-A evaporator condensate, Environmental Restoration Disposal Facility (ERDF) leachate, and WTP off-gas condensate) using two leachants, DIW and simulated Hanford Integrated Disposal Facility (IDF) Site vadose zone pore water (VZPW); 4.estimating the 99Tc desorption K d (distribution coefficient) values for 99Tc transport in oxidizing conditions to support the IDF performance assessment (PA); 5.estimating the solubility of 99Tc(IV)-bearing solid phases for 99Tc transport in reducing conditions to support the IDF PA.« less

  9. Dimensional Stability of Grout-Type Materials Used as Connections for Prefabricated Bridge Elements

    DOT National Transportation Integrated Search

    2016-05-01

    The research presented in this report focuses on addressing performance concerns related to dimensional stability (primarily early age shrinkage) of 11 commercially available grout-type materials. Some of these grouts, especially those classified as ...

  10. Corrosion performance of prestressing strands in contact with dissimilar grouts.

    DOT National Transportation Integrated Search

    2013-01-01

    To improve the corrosion protection provided to prestressing strands, anti-bleed grouts are used to fill voids in post-tensioning : ducts that result from bleeding and shrinkage of older Portland Cement grouts. Environmental differences caused by exp...

  11. Silica sol as grouting material: a physio-chemical analysis.

    PubMed

    Sögaard, Christian; Funehag, Johan; Abbas, Zareen

    2018-01-01

    At present there is a pressing need to find an environmentally friendly grouting material for the construction of tunnels. Silica nanoparticles hold great potential of replacing the organic molecule based grouting materials currently used for this purpose. Chemically, silica nanoparticles are similar to natural silicates which are essential components of rocks and soil. Moreover, suspensions of silica nanoparticles of different sizes and desired reactivity are commercially available. However, the use of silica nanoparticles as grouting material is at an early stage of its technological development. There are some critical parameters such as long term stability and functionality of grouted silica that need to be investigated in detail before silica nanoparticles can be considered as a reliable grouting material. In this review article we present the state of the art regarding the chemical properties of silica nanoparticles commercially available, as well as experience gained from the use of silica as grouting material. We give a detailed description of the mechanisms underlying the gelling of silica by different salt solutions such as NaCl and KCl and how factors such as particle size, pH, and temperature affect the gelling and gel strength development. Our focus in this review is on linking the chemical properties of silica nanoparticles to the mechanical properties to better understand their functionality and stability as grouting material. Along the way we point out areas which need further research.

  12. Finite Element Analysis of Grouting Compactness Monitoring in a Post-Tensioning Tendon Duct Using Piezoceramic Transducers

    PubMed Central

    Jiang, Tianyong; Song, Gangbing

    2017-01-01

    With the development of the post-tensioning technique, prestressed concrete structures have been widely used in civil engineering. To ensure the long-term effectiveness of the prestressed tendon, the grouting quality of the tendon duct is one of the important factors. However, it is still a challenge to monitor the grouting quality of post-tensioning tendon ducts, due to the invisibility of the grouting. The authors’ previous work proposed a real-time method that employed a stress wave-based active sensing approach with piezoceramic transducers to monitor the grouting compactness of a Post-Tensioning Tendon Duct (PTTD). To further understand the piezoceramic induced stress wave propagation in the PTTD with different grouting levels, this paper develops a two-dimensional finite element model for monitoring the grouting compactness of the tendon duct with a piezoceramic transducer. A smart aggregate (SA) developed to utilize one Lead Zirconate Titanate (PZT) transducer with marble protection is installed in the center location of the tendon duct as an actuator. Two PZT patches are bonded on the bottom and top surface of the tendon duct as the sensors. The analysis results show that the finite element analysis results are in good agreement with the experimental results, which demonstrates that the finite element analysis is feasible and reliable. For the top half of the specimen, not much stress wave could be detected before the full grouting level, except for negligible signals that may propagate through the walls of the tendon duct. When the tendon duct grouting is at 100%, the stress wave propagates to the top of the specimen, and the displacements are symmetric in both left-right and top-bottom directions before the stress waves reach the boundary. The proposed two-dimensional finite element model has the potential to be implemented to simulate the stress wave propagation principle for monitoring grouting compaction of the post-tensioning tendon duct. PMID:28961173

  13. Finite Element Analysis of Grouting Compactness Monitoring in a Post-Tensioning Tendon Duct Using Piezoceramic Transducers.

    PubMed

    Jiang, Tianyong; Zheng, Junbo; Huo, Linsheng; Song, Gangbing

    2017-09-29

    With the development of the post-tensioning technique, prestressed concrete structures have been widely used in civil engineering. To ensure the long-term effectiveness of the prestressed tendon, the grouting quality of the tendon duct is one of the important factors. However, it is still a challenge to monitor the grouting quality of post-tensioning tendon ducts, due to the invisibility of the grouting. The authors' previous work proposed a real-time method that employed a stress wave-based active sensing approach with piezoceramic transducers to monitor the grouting compactness of a Post-Tensioning Tendon Duct (PTTD). To further understand the piezoceramic induced stress wave propagation in the PTTD with different grouting levels, this paper develops a two-dimensional finite element model for monitoring the grouting compactness of the tendon duct with a piezoceramic transducer. A smart aggregate (SA) developed to utilize one Lead Zirconate Titanate (PZT) transducer with marble protection is installed in the center location of the tendon duct as an actuator. Two PZT patches are bonded on the bottom and top surface of the tendon duct as the sensors. The analysis results show that the finite element analysis results are in good agreement with the experimental results, which demonstrates that the finite element analysis is feasible and reliable. For the top half of the specimen, not much stress wave could be detected before the full grouting level, except for negligible signals that may propagate through the walls of the tendon duct. When the tendon duct grouting is at 100%, the stress wave propagates to the top of the specimen, and the displacements are symmetric in both left-right and top-bottom directions before the stress waves reach the boundary. The proposed two-dimensional finite element model has the potential to be implemented to simulate the stress wave propagation principle for monitoring grouting compaction of the post-tensioning tendon duct.

  14. Application of resistivity monitoring to evaluate cement grouting effect in earth filled dam

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kim, Jin-Mo; Yoon, Wang-Jung

    In this paper, we applied electrical resistivity monitoring method to evaluate the cement grouting effect. There are a lot of ways to evaluate cement grouting effect. In order to do this evaluation in a great safety, high efficiency, and lower cost, resistivity monitoring is found to be the most appropriate technique. In this paper we have selected a dam site from Korea to acquire resistivity monitoring data and compare the results of inversion to estimate the cement grouting effect.

  15. Grout Isolation and Stabilization of Structures and Materials within Nuclear Facilities at the U.S. Department of Energy, Hanford Site, Summary - 12309

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Phillips, S.J.; Phillips, M.; Etheridge, D.

    2012-07-01

    Per regulatory agreement and facility closure design, U.S. Department of Energy Hanford Site nuclear fuel cycle structures and materials require in situ isolation in perpetuity and/or interim physicochemical stabilization as a part of final disposal or interim waste removal, respectively. To this end, grout materials are being used to encase facilities structures or are being incorporated within structures containing hazardous and radioactive contaminants. Facilities where grout materials have been recently used for isolation and stabilization include: (1) spent fuel separations, (2) uranium trioxide calcining, (3) reactor fuel storage basin, (4) reactor fuel cooling basin transport rail tanker cars and casks,more » (5) cold vacuum drying and reactor fuel load-out, and (6) plutonium fuel metal finishing. Grout components primarily include: (1) portland cement, (2) fly ash, (3) aggregate, and (4) chemical admixtures. Mix designs for these typically include aggregate and non aggregate slurries and bulk powders. Placement equipment includes: (1) concrete piston line pump or boom pump truck for grout slurry, (2) progressive cavity and shearing vortex pump systems, and (3) extendable boom fork lift for bulk powder dry grout mix. Grout slurries placed within the interior of facilities were typically conveyed utilizing large diameter slick line and the equivalent diameter flexible high pressure concrete conveyance hose. Other facilities requirements dictated use of much smaller diameter flexible grout conveyance hose. Placement required direct operator location within facilities structures in most cases, whereas due to radiological dose concerns, placement has also been completed remotely with significant standoff distances. Grout performance during placement and subsequent to placement often required unique design. For example, grout placed in fuel basin structures to serve as interim stabilization materials required sufficient bearing i.e., unconfined compressive strength, to sustain heavy equipment yet, low breakout force to permit efficient removal by track hoe bucket or equivalent construction equipment. Further, flow of slurries through small orifice geometries of moderate head pressures was another typical design requirement. Phase separation of less than 1 percent was a typical design requirement for slurries. On the order of 30,000 cubic meters of cementitious grout have recently been placed in the above noted U.S. Department of Energy Hanford Site facilities or structures. Each has presented a unique challenge in mix design, equipment, grout injection or placement, and ultimate facility or structure performance. Unconfined compressive and shear strength, flow, density, mass attenuation coefficient, phase separation, air content, wash-out, parameters and others, unique to each facility or structure, dictate the grout mix design for each. Each mix design was tested under laboratory and scaled field conditions as a precursor to field deployment. Further, after injection or placement of each grout formulation, the material was field inspected either by standard laboratory testing protocols, direct physical evaluation, or both. (authors)« less

  16. Secondary Waste Simulant Development for Cast Stone Formulation Testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Russell, Renee L.; Westsik, Joseph H.; Rinehart, Donald E.

    Washington River Protection Solutions, LLC (WRPS) funded Pacific Northwest National Laboratory (PNNL) to conduct a waste form testing program to implement aspects of the Secondary Liquid Waste Treatment Cast Stone Technology Development Plan (Ashley 2012) and the Hanford Site Secondary Waste Roadmap (PNNL 2009) related to the development and qualification of Cast Stone as a potential waste form for the solidification of aqueous wastes from the Hanford Site after the aqueous wastes are treated at the Effluent Treatment Facility (ETF). The current baseline is that the resultant Cast Stone (or grout) solid waste forms would be disposed at the Integratedmore » Disposal Facility (IDF). Data and results of this testing program will be used in the upcoming performance assessment of the IDF and in the design and operation of a solidification treatment unit planned to be added to the ETF. The purpose of the work described in this report is to 1) develop simulants for the waste streams that are currently being fed and future WTP secondary waste streams also to be fed into the ETF and 2) prepare simulants to use for preparation of grout or Cast Stone solid waste forms for testing.« less

  17. Seismic Performance of Columns with Grouted Couplers in Idaho Accelerated Bridge Construction Applications

    DOT National Transportation Integrated Search

    2016-10-16

    n Accelerated Bridge Construction (ABC) methods, one way to connect prefabricated columns is by using grouted steel bar couplers. As of October 2016, in the U.S., only Utah DOT allows the use of grouted couplers in plastic hinge locations in seismic ...

  18. Environmental Technology Verification Report: Grouts for Wastewater Collection Systems, Separation Systems Consultants Inc., GST3 Grout

    EPA Science Inventory

    Municipalities are discovering rapid degradation of infrastructures in wastewater collection and treatment facilities due to infiltration of leaking water from the surrounding environments. Rehabilitation of these facilities by in situ methods, including the use of grouting, is u...

  19. Environmental Technology Verification Report: Grouts for Wastewater Collection Systems, Warren Environmental, Inc. 301-04 Epoxy Grout

    EPA Science Inventory

    Municipalities are discovering rapid degradation of infrastructures in wastewater collection and treatment facilities due to infiltration of leaking water from the surrounding environments. Rehabilitation of these facilities by in situ methods, including the use of grouting, is u...

  20. Development of laboratory test methods to replace the simulated high-temperature grout fluidity test.

    DOT National Transportation Integrated Search

    2014-06-01

    This report contains a summary of the research performed to develop a replacement for the high-temperature grout : fluidity (HTGF) test. The HTGF test was employed in the past by FDOT to qualify post-tensioning (PT) grouts for use in : post-tensioned...

  1. Research in Foundation Grouting with Cement

    DTIC Science & Technology

    1960-03-01

    grout is mixed. 2. For cracks of the order of 0.05 in., a grout in which the ratio[ of water to cement is 0.75 by volune gives the r’ost desirable 4... thickness of the order of t5 in. 4. 3hear tests on grout films fog-cured at 70 F for 28 days denon- stratel that increasing the pressure within the...alkaline water dripre.I through cracks in the concrete lidng of some of the penstock tunnels Jai daaged the paint an- metal -work. The uplift pressure

  2. Design of a Bottom Impermeable Barrier in Conjunction with A contaminated Site Containment Structure.

    DTIC Science & Technology

    1994-05-01

    utilizes drill bits and tubing to cut through the soil. Unlike the auger method, a slurry mixture is used to keep the drill bit clean and assist in...is applied. In the sleeve pipe method, or also called tube -a-manchette, the sleeve pipe is installed in the grout hole, and sealed in place with a...acts as a one-way valve. allowing grout out of the pipe, but not back into the sleeve. A grouting tube with double packer is used to inject the grout

  3. The physical model for research of behavior of grouting mixtures

    NASA Astrophysics Data System (ADS)

    Hajovsky, Radovan; Pies, Martin; Lossmann, Jaroslav

    2016-06-01

    The paper deals with description of physical model designed for verification of behavior of grouting mixtures when applied below underground water level. Described physical model has been set up to determine propagation of grouting mixture in a given environment. Extension of grouting in this environment is based on measurement of humidity and temperature with the use of combined sensors located within preinstalled special measurement probes around grouting needle. Humidity was measured by combined capacity sensor DTH-1010, temperature was gathered by a NTC thermistor. Humidity sensors measured time when grouting mixture reached sensor location point. NTC thermistors measured temperature changes in time starting from initial of injection. This helped to develop 3D map showing the distribution of grouting mixture through the environment. Accomplishment of this particular measurement was carried out by a designed primary measurement module capable of connecting 4 humidity and temperature sensors. This module also takes care of converting these physical signals into unified analogue signals consequently brought to the input terminals of analogue input of programmable automation controller (PAC) WinPAC-8441. This controller ensures the measurement itself, archiving and visualization of all data. Detail description of a complex measurement system and evaluation in form of 3D animations and graphs is supposed to be in a full paper.

  4. Grout compactness monitoring of concrete-filled fiber-reinforced polymer tube using electromechanical impedance

    NASA Astrophysics Data System (ADS)

    Shi, Yaokun; Luo, Mingzhang; Li, Weijie; Song, Gangbing

    2018-05-01

    The concrete-filled fiber-reinforced polymer tube (CFFT) is a type of structural element widely used in corrosive environments. Poor grout compactness results in incomplete contact or even no contact between the fiber-reinforced polymer (FRP) tube and the concrete grout, which reduces the load bearing capacity of a CFFT. The monitoring of grout compactness for CFFTs is important. The piezoceramic-based electromechanical impedance (EMI) method has emerged as an efficient and low-cost structural health monitoring technique. This paper presents a feasibility study using the EMI method to monitor grout compactness of CFFTs. In this research, CFFT specimens with different levels of compactness (empty, 1/5, 1/3, 1/2, 2/3, and full compactness) were prepared and subjected to EMI measurement by using four piezoceramic patches that were bonded circumferentially along the outer surface of the CFFT. To analyze the correlation between grout compactness and EMI signatures, a compactness index (CI) was proposed based on the root-mean-square deviation (RMSD). The experimental results show that the changes in admittance signatures are able to determine the grout compactness qualitatively. The proposed CI is able to effectively identify the compactness of the CFFT, and provides location information of the incomplete concrete infill.

  5. Thermal Response Testing Takes a Step Forward

    DOE PAGES

    Clemenzi, Rick; Ewbank, Garen; Siglin, Judy; ...

    2017-09-01

    Oak Ridge National Labs has independently confirmed the accuracy of a new breakthrough Advanced Thermal Response Test (TRT) method that it claims “uses less than half of the test time, allows for a fluctuating or interruptible heat flux, performs quality validation of a GHEX installation, and yields new insights into ground thermal conductivity that warrant further research.” The new Advanced TRT approach will reduce costs and, for the first time, also determine the actual thermal conductivity of grout as it is installed. As everyone in the ground source heat pump (GSHP) industry knows, assuring the quality of the grout jobmore » of a ground heat exchanger (GHEX) is an especially vexing problem. Unless one is standing at the borehole head the entire time grouting is underway, they basically have no idea how good or bad the grouting job is or even if the loop pipe itself is installed correctly. This problem has been further brought to light with formal third party grout reports confirming that grout had been poured from the surface and that many loops were shorter than the specified depth in several projects« less

  6. Thermal Response Testing Takes a Step Forward

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clemenzi, Rick; Ewbank, Garen; Siglin, Judy

    Oak Ridge National Labs has independently confirmed the accuracy of a new breakthrough Advanced Thermal Response Test (TRT) method that it claims “uses less than half of the test time, allows for a fluctuating or interruptible heat flux, performs quality validation of a GHEX installation, and yields new insights into ground thermal conductivity that warrant further research.” The new Advanced TRT approach will reduce costs and, for the first time, also determine the actual thermal conductivity of grout as it is installed. As everyone in the ground source heat pump (GSHP) industry knows, assuring the quality of the grout jobmore » of a ground heat exchanger (GHEX) is an especially vexing problem. Unless one is standing at the borehole head the entire time grouting is underway, they basically have no idea how good or bad the grouting job is or even if the loop pipe itself is installed correctly. This problem has been further brought to light with formal third party grout reports confirming that grout had been poured from the surface and that many loops were shorter than the specified depth in several projects« less

  7. Grout formulation for disposal of low-level and hazardous waste streams containing fluoride

    DOEpatents

    McDaniel, E.W.; Sams, T.L.; Tallent, O.K.

    1987-06-02

    A composition and related process for disposal of hazardous waste streams containing fluoride in cement-based materials is disclosed. the presence of fluoride in cement-based materials is disclosed. The presence of fluoride in waste materials acts as a set retarder and as a result, prevents cement-based grouts from setting. This problem is overcome by the present invention wherein calcium hydroxide is incorporated into the dry-solid portion of the grout mix. The calcium hydroxide renders the fluoride insoluble, allowing the grout to set up and immobilize all hazardous constituents of concern. 4 tabs.

  8. Improved method and composition for immobilization of waste in cement-based material

    DOEpatents

    Tallent, O.K.; Dodson, K.E.; McDaniel, E.W.

    1987-10-01

    A composition and method for fixation or immobilization of aqueous hazardous waste material in cement-based materials (grout) is disclosed. The amount of drainable water in the cured grout is reduced by the addition of an ionic aluminum compound to either the waste material or the mixture of waste material and dry-solid cement- based material. This reduction in drainable water in the cured grout obviates the need for large, expensive amounts of gelling clays in grout materials and also results in improved consistency and properties of these cement-based waste disposal materials.

  9. Numerical Analysis on Tensile Properties of Grout-filled Splice Sleeve Rebars under ISO 834 Standard Fire

    NASA Astrophysics Data System (ADS)

    Liu, Yong Jun; Li, Chao; Zhou, When Jun

    2018-06-01

    This paper presents some numerical simulation results of tensile properties of reinforcing bars spliced by grout-filled coupling sleeves under fire conditions to identify the effect of load ratio on fire resistance time of spliced reinforcing bars, which provide a useful base for predicting structural behaviors of pre-cast reinforced concrete buildings in fires. A spliced rebar system investigated in this paper consists of two equal-diameter steel reinforcing bars with 25mm diameter and a straight coupling sleeve with 50mm outer and 45mm inner diameters. As a result, the thickness of grout between steel bars and sleeves are 20mm. Firstly, the temperature distributions in steel bars connected by grout- filled coupling sleeves exposed to ISO 834 standard fire were calculated utilizing finite element analysis software ANSYS. Secondly, the stress changes in heated steel bars connected by grout-filled coupling sleeves under different constant tensile loads were calculated step by step until the rebar system failed due to fire. Thus, the fire resistant time of rebar spliced by grout-filled coupling sleeves under different axial tensile loads can be determined, further, the relationship between fire resistance time and axial tensile loads ratio can could be obtained. Finally, the fire resistant times versus axial tensile load ratios curve of grout-filled splice sleeve rebars exposed to ISO 834 standard fire is presented.

  10. Gas-Recovery System

    DOEpatents

    Heckman, R. A.

    1971-12-14

    Nuclear explosions have been proposed as a means for recovering gas from underground gas-bearing rock formations. In present practice, the nuclear device is positioned at the end of a long pipe which is subsequently filled with grout or concrete. After the device is exploded, the grout is drilled through to provide a flow path for the released gas to the ground surface. As settled grout is brittle, often the compressive shock of the explosion fractures the grout and deforms the pipe so that it may not be removed nor reused. In addition, the pipe is sometimes pinched off completely and the gas flow is totally obstructed. (2 claims)

  11. Gas-recovery system

    DOEpatents

    Heckman, R.A.

    1971-12-14

    Nuclear explosions have been proposed as a means for recovering gas from underground gas-bearing rock formations. In present practice, the nuclear device is positioned at the end of a long pipe which is subsequently filled with grout or concrete. After the device is exploded, the grout is drilled through to provide a flow path for the released gas to the ground surface. As settled grout is brittle, often the compressive shock of the explosion fractures the grout and deforms the pipe so that it may not be removed nor reused. In addition, the pipe is sometimes pinched off completely and the gas flow is totally obstructed. (2 claims)

  12. Ultrafine cementitious grout

    DOEpatents

    Ahrens, Ernst H.

    1999-01-01

    An ultrafine cementitious grout in three particle grades containing Portland cement, pumice as a pozzolanic material and superplasticizer in the amounts of about 30 wt. % to about 70 wt. % Portland cement; from about 30 wt. % to about 70 wt. % pumice containing at least 70% amorphous silicon dioxide; and from 1.2 wt. % to about 5.0 wt. % superplasticizer. The superplasticizer is dispersed in the mixing water prior to the addition of dry grout and the W/CM ratio is about 0.4 to 1/1. The grout has very high strength and very low permeability with good workability. The ultrafine particle sizes allow for sealing of microfractures below 10 .mu.m in width.

  13. Influence of Silica Fume Addition in the Long-Term Performance of Sustainable Cement Grouts for Micropiles Exposed to a Sulphate Aggressive Medium

    PubMed Central

    Esteban, María Dolores; Rodríguez, Raúl Rubén; Ibanco, Francisco José; Sánchez, Isidro

    2017-01-01

    At present, sustainability is of major importance in the cement industry, and the use of additions such as silica fume as clinker replacement contributes towards that goal. Special foundations, and particularly micropiles, are one of the most suitable areas for the use of sustainable cements. The aim of this research is to analyse the effects in the very long-term (for 600 days) produced by sulphate attack in the microstructure of grouts for micropiles in which OPC (ordinary Portland cement) has been replaced by 5% and 10% silica fume. This line of study is building on a previous work, where these effects were studied in slag and fly ash grouts. Grouts made using a commercial sulphate-resisting Portland cement were also studied. The non-destructive impedance spectroscopy technique, mercury intrusion porosimetry, and Wenner resistivity testing were used. Mass variation and the compressive strength have also been analysed. Apparently, impedance spectroscopy is the most suitable technique for studying sulphate attack development. According to the results obtained, grouts for micropiles with a content of silica fume up to 10% and exposed to an aggressive sulphate medium, have a similar or even better behaviour in the very long-term, compared to grouts prepared using sulphate-resisting Portland cement. PMID:28767078

  14. Influence of Silica Fume Addition in the Long-Term Performance of Sustainable Cement Grouts for Micropiles Exposed to a Sulphate Aggressive Medium.

    PubMed

    Ortega, José Marcos; Esteban, María Dolores; Rodríguez, Raúl Rubén; Pastor, José Luis; Ibanco, Francisco José; Sánchez, Isidro; Climent, Miguel Ángel

    2017-08-02

    At present, sustainability is of major importance in the cement industry, and the use of additions such as silica fume as clinker replacement contributes towards that goal. Special foundations, and particularly micropiles, are one of the most suitable areas for the use of sustainable cements. The aim of this research is to analyse the effects in the very long-term (for 600 days) produced by sulphate attack in the microstructure of grouts for micropiles in which OPC (ordinary Portland cement) has been replaced by 5% and 10% silica fume. This line of study is building on a previous work, where these effects were studied in slag and fly ash grouts. Grouts made using a commercial sulphate-resisting Portland cement were also studied. The non-destructive impedance spectroscopy technique, mercury intrusion porosimetry, and Wenner resistivity testing were used. Mass variation and the compressive strength have also been analysed. Apparently, impedance spectroscopy is the most suitable technique for studying sulphate attack development. According to the results obtained, grouts for micropiles with a content of silica fume up to 10% and exposed to an aggressive sulphate medium, have a similar or even better behaviour in the very long-term, compared to grouts prepared using sulphate-resisting Portland cement.

  15. Construction of Fluid - solid Coupling Model with Improved Richards - BP & Its Engineering Application

    NASA Astrophysics Data System (ADS)

    Xie, Chengyu; Jia, Nan; Shi, Dongping; Lu, Hao

    2017-10-01

    In order to study the slurry diffusion law during grouting, Richards unsaturated-saturated model was introduced, the definition of the grouting model is clear, the Richards model control equation was established, And the BP neural network was introduced, the improved fluid-solid coupling model was constructed, Through the use of saturated - unsaturated seepage flow model, As well as the overflow boundary iterative solution of the mixed boundary conditions, the free surface is calculated. Engineering practice for an example, with the aid of multi - field coupling analysis software, the diffusion law of slurry was simulated numerically. The results show that the slurry diffusion rule is affected by grouting material, initial pressure and other factors. When the slurry starts, it flows in the cracks along the upper side of the grouting hole, when the pressure gradient is reduced to the critical pressure, that is, to the lower side of the flow, when the slurry diffusion stability, and ultimately its shape like an 8. The slurry is spread evenly from the overall point of view, from the grouting mouth toward the surrounding evenly spread, it gradually reaches saturation by non-saturation, and it is not a purely saturated flow, when the slurry spread and reach a saturated state, the diffusion time is the engineering grouting time.

  16. Pullout Performances of Grouted Rockbolt Systems with Bond Defects

    NASA Astrophysics Data System (ADS)

    Xu, Chang; Li, Zihan; Wang, Shanyong; Wang, Shuren; Fu, Lei; Tang, Chunan

    2018-03-01

    This paper presents a numerical study on the pullout behaviour of fully grouted rockbolts with bond defects. The cohesive zone model (CZM) is adopted to model the bond-slip behaviour between the rockbolt and grout material. Tensile tests were also conducted to validate the numerical model. The results indicate that the defect length can obviously influence the load and stress distributions along the rockbolt as well as the load-displacement response of the grouted system. Moreover, a plateau in the stress distribution forms due to the bond defect. The linear limit and peak load of the load-displacement response decrease as the defect length increases. A bond defect located closer to the loaded end leads to a longer nonlinear stage in the load-displacement response. However, the peak loads measured from the specimens made with various defect locations are almost approximately the same. The peak load for a specimen with the defects equally spaced along the bolt is higher than that for a specimen with defects concentrated in a certain zone, even with the same total defect length. Therefore, the dispersed pattern of bond defects would be much safer than the concentrated pattern. For the specimen with dispersed defects, the peak load increases with an increase in the defect spacing, even if the total defect length is the same. The peak load for a grouted rockbolt system with defects increases with an increases in the bolt diameter. This work leads to a better understanding of the load transfer mechanism for grouted rockbolt systems with bond defects, and paves the way towards developing a general evaluation method for damaged rockbolt grouted systems.

  17. A portable high-power diode laser-based single-stage ceramic tile grout sealing system

    NASA Astrophysics Data System (ADS)

    Lawrence, J.; Schmidt, M. J. J.; Li, L.; Edwards, R. E.; Gale, A. W.

    2002-02-01

    By means of a 60 W high-power diode laser (HPDL) and a specially developed grout material the void between adjoining ceramic tiles has been successfully sealed. A single-stage process has been developed which uses a crushed ceramic tile mix to act as a tough, inexpensive bulk substrate and a glazed enamel surface to provide an impervious surface glaze. The single-stage ceramic tile grout sealing process yielded seals produced in normal atmospheric conditions that displayed no discernible cracks and porosities. The single-stage grout is simple to formulate and easy to apply. Tiles were successfully sealed with power densities as low as 200 kW/ mm2 and at rates of up to 600 mm/ min. Bonding of the enamel to the crushed ceramic tile mix was identified as being primarily due to van der Waals forces and, on a very small scale, some of the crushed ceramic tile mix material dissolving into the glaze. In terms of mechanical, physical and chemical characteristics, the single-stage ceramic tile grout was found to be far superior to the conventional epoxy tile grout and, in many instances, matched and occasionally surpassed that of the ceramic tiles themselves. What is more, the development of a hand-held HPDL beam delivery unit and the related procedures necessary to lead to the commercialisation of the single-stage ceramic tile grout sealing process are presented. Further, an appraisal of the potential hazards associated with the use of the HPDL in an industrial environment and the solutions implemented to ensure that the system complies with the relevant safety standards are given.

  18. ICPP tank farm closure study. Volume 2: Engineering design files

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-02-01

    Volume 2 contains the following topical sections: Tank farm heel flushing/pH adjustment; Grouting experiments for immobilization of tank farm heel; Savannah River high level waste tank 20 closure; Tank farm closure information; Clean closure of tank farm; Remediation issues; Remote demolition techniques; Decision concerning EIS for debris treatment facility; CERCLA/RCRA issues; Area of contamination determination; Containment building of debris treatment facility; Double containment issues; Characterization costs; Packaging and disposal options for the waste resulting from the total removal of the tank farm; Take-off calculations for the total removal of soils and structures at the tank farm; Vessel off-gas systems; Jet-groutedmore » polymer and subsurface walls; Exposure calculations for total removal of tank farm; Recommended instrumentation during retrieval operations; High level waste tank concrete encasement evaluation; Recommended heavy equipment and sizing equipment for total removal activities; Tank buoyancy constraints; Grout and concrete formulas for tank heel solidification; Tank heel pH requirements; Tank cooling water; Evaluation of conservatism of vehicle loading on vaults; Typical vault dimensions and approximately tank and vault void volumes; Radiological concerns for temporary vessel off-gas system; Flushing calculations for tank heels; Grout lift depth analysis; Decontamination solution for waste transfer piping; Grout lift determination for filling tank and vault voids; sprung structure vendor data; Grout flow properties through a 2--4 inch pipe; Tank farm load limitations; NRC low level waste grout; Project data sheet calculations; Dose rates for tank farm closure tasks; Exposure and shielding calculations for grout lines; TFF radionuclide release rates; Documentation of the clean closure of a system with listed waste discharge; and Documentation of the ORNL method of radionuclide concentrations in tanks.« less

  19. Impact of a grout curtain on groundwater regime in karst: the example of the Ðale reservoir (Croatia)

    NASA Astrophysics Data System (ADS)

    Bonacci, Ognjen; Roje-Bonacci, Tanja

    2010-05-01

    Construction of grout curtains in karst terrains is primarily connected with dams and reservoirs. Their role is to increase watertightness and prevent progressive erosion. In this presentation hourly continuous measurement of groundwater level in two deep piezometers near the Đale reservoir is analysed. The Đale reservoir in the Cetina River began operation in 1989. The total length of the grout curtain is 3.9 km. It spreads 120 m bellow the Đale dam. First analysed piezometer A is drilled in the interior part of the system, between the reservoir and the grout curtain, while the second one B is located in its external part. Distance between them is 200 m. In natural conditions, prior the grout curtain construction, groundwater level fluctuation in both of them was similar (practically the same). Construction of the grout curtain extremely changed groundwater behaviour in each of them. During the six month of continuous monitoring, differences between groundwater levels in them range between +19.86 m (groundwater in B is lower than in A) and -12.77 m (groundwater in A is lower than in B). During the 77% of analysed period the groundwater level in interior piezometer A is higher than the groundwater level in external piezometer B. In other 23% of analysed period the groundwater level in outside piezometer B is higher than in inside A. The construction of the grout curtain caused unnaturally high hydrostatic gradients, which can accelerate the dissolutional expansion of karst fractures. As a result, unbearable leakage of the reservoir Đale can occur over its lifetime. Careful analyses of groundwater level behaviour discover some other very important characteristics of karst underground morphology.

  20. Development of Freshwater Grout Subsequent to the Bell Canyon Tests (BCT).

    DTIC Science & Technology

    1986-04-01

    specimens of those grouts cured and studied in the SL, to three-years age. Selected data from earlier tests of related fresh-water grouts are...specimens were either coated with a strippable plastic momn;rane, or sealed in plastic cylinders with tightly fitting lids. Sealed in plastiC habs in...for expansion prisms, the strippable coating applied to SPDV specimens did not prevent water loss. Lower strength gain may be attributable to partial

  1. Microstructural Effects of Sulphate Attack in Sustainable Grouts for Micropiles.

    PubMed

    Ortega Álvarez, José Marcos; Esteban Pérez, María Dolores; Rodríguez Escribano, Raúl Rubén; Pastor Navarro, José Luís; Sánchez Martín, Isidro

    2016-11-08

    Nowadays, the use of micropiles has undergone a great development. In general, they are made with cement grout, reinforced with steel tubing. In Spain, these grouts are prepared using OPC, although the standards do not forbid the use of other cements, like sustainable ones. Micropiles are in contact with soils and groundwater, in which the presence of sulphates is common. Their deleterious effects firstly affect to the microstructure. Then, the aim of this research is to study the effects of sulphate attack in the microstructure of micropiles grouts, prepared with OPC, fly ash and slag commercial cements, compared to their behaviour when they are exposed to an optimum hardening condition. The microstructure evolution has been studied with the non-destructive impedance spectroscopy technique, which has never been used for detecting the effects of sulphate attack when slag and fly ash cements are used. Its results have been contrasted with mercury intrusion porosimetry and "Wenner" resistivity ones. The 28-day compressive strength of grouts has been also determined. The results of microstructure characterization techniques are in agreement, although impedance spectroscopy is the most sensitive for following the changes in the porous network of grouts. The results showed that micropiles made using fly ash and slag cements could have a good performance in contact with aggressive sodium sulphate media, even better than OPC ones.

  2. Microstructural Effects of Sulphate Attack in Sustainable Grouts for Micropiles

    PubMed Central

    Ortega Álvarez, José Marcos; Esteban Pérez, María Dolores; Rodríguez Escribano, Raúl Rubén; Pastor Navarro, José Luís; Sánchez Martín, Isidro

    2016-01-01

    Nowadays, the use of micropiles has undergone a great development. In general, they are made with cement grout, reinforced with steel tubing. In Spain, these grouts are prepared using OPC, although the standards do not forbid the use of other cements, like sustainable ones. Micropiles are in contact with soils and groundwater, in which the presence of sulphates is common. Their deleterious effects firstly affect to the microstructure. Then, the aim of this research is to study the effects of sulphate attack in the microstructure of micropiles grouts, prepared with OPC, fly ash and slag commercial cements, compared to their behaviour when they are exposed to an optimum hardening condition. The microstructure evolution has been studied with the non-destructive impedance spectroscopy technique, which has never been used for detecting the effects of sulphate attack when slag and fly ash cements are used. Its results have been contrasted with mercury intrusion porosimetry and “Wenner” resistivity ones. The 28-day compressive strength of grouts has been also determined. The results of microstructure characterization techniques are in agreement, although impedance spectroscopy is the most sensitive for following the changes in the porous network of grouts. The results showed that micropiles made using fly ash and slag cements could have a good performance in contact with aggressive sodium sulphate media, even better than OPC ones. PMID:28774026

  3. Injectable barriers for waste isolation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Persoff, P.; Finsterle, S.; Moridis, G.J.

    In this paper the authors report laboratory work and numerical simulation done in support of development and demonstration of injectable barriers formed from either of two fluids: colloidal silica or polysiloxane. Two principal problems addressed here are control of gel time and control of plume emplacement in the vadose zone. Gel time must be controlled so that the viscosity of the barrier fluid remains low long enough to inject the barrier, but increases soon enough to gel the barrier in place. During injection, the viscosity must be low enough to avoid high injection pressures which could uplift or fracture themore » formation. To test the grout gel time in the soil, the injection pressure was monitored as grouts were injected into sandpacks. When grout is injected into the vadose zone, it slumps under the influence of gravity, and redistributes due to capillary forces as it gels. The authors have developed a new module for the reservoir simulator TOUGH2 to model grout injection into the vadose zone, taking into account the increase of liquid viscosity as a function of gel concentration and time. They have also developed a model to calculate soil properties after complete solidification of the grout. The numerical model has been used to design and analyze laboratory experiments and field pilot tests. The authors present the results of computer simulations of grout injection, redistribution, and solidification.« less

  4. A new design concept of fully grouted rock bolts in underground construction

    NASA Astrophysics Data System (ADS)

    Phich Nguyen, Quang; Nguyen, Van Manh; Tuong Nguyen, Ke

    2018-04-01

    The main problem after excavating an underground excavation is to maintain the stability of the excavation for a certain period of time. Failure in meeting this demand is a threat to safety of men and equipment. Support and reinforcement are different instruments with different mechanisms. Among the common support systems in tunnelling and mining, rock bolts have been widely used to reinforce rock mass and also to reduce geological hazards. Furthermore rock bolts can be applied under varying different geological conditions with cost-effectiveness. Although different methods are developed for grouted rock bolts design until now, the interaction mechanism of the rock bolts and rock mass is still very complicated issue. The paper addresses an analytical model for the analysis and design of fully grouted rock bolts based on the reinforcement principle. According to this concept the jointed rock mass reinforced by grouted rock bolts is considered as composite material which includes rock mass, the grout material and the bolt shank. The mechanical properties of this composite material depend on the ratio of the components. The closed-form solution was developed based on the assumption that the rock mass arround a circular tunnel remained elastic after installing fully grouted rock bolts. The main parameters of the rock-bolt system (the diameter and length of bolt shank, the space between the bolts) are then easily estimated from the obtained solution.

  5. Silicate-catalyzed chemical grouting compositions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1972-09-28

    Chemical grouting compositions for stabilizing earth, sand, and other porous particulate formations or agglomerates of solids are described. The composition for producing a chemically grouting structure consists of an aqueous base solution of: (1) vegetative polyphenolic material consisting of condensed type tannins, and an aqueous catalyst solution of (2) a water-soluble alkali metal silicate. The polyphenolic material is present in an amount from 5% to 40% based on the weight of the base solution, and the water- soluble alkali metal silicate is present in an amount to provide from 1% to 15% SiOD2U in the silicate compound based on themore » weight of the polyphenolic material. These grouting compositions are completely safe to operating personnel and to surrounding environment, since the potassium or sodium silicate catalysts are nontoxic. (15 claims)« less

  6. Process for impregnating a concrete or cement body with a polymeric material

    DOEpatents

    Mattus, A.J.; Spence, R.D.

    1988-05-04

    A process for impregnating cementitious solids with polymeric materials by blending polymeric materials in a grout, allowing the grout to cure, and contacting the resulting solidified grout containing the polymeric materials with an organic mixture containing a monomer, a cross-linking agent and a catalyst. The mixture dissolves the polymerized particles and forms a channel for distributing the monomer throughout the network formed by the polymeric particles. The organic components are then cured to form a substantially water-impermeable mass.

  7. Analysis on pile testing results of post-grouting bored pile

    NASA Astrophysics Data System (ADS)

    Zheng, A. R.

    2017-04-01

    Based on static load test results, the bearing capacity of bored piles with pile-toe and pile-shaft post-grouting has been analyzed. The analysis reveals that: with post-grouting, the interface between pile and surrounding soil are strengthened and the relative sliding displacement in between is reduced; end resistance of pile is enhanced and can be mobilized at earlier stage with smaller sliding displacement. As a result, the performance of bored pile is improved with increased bearing capacity and reduced settlement.

  8. Yatesville Lake, Big Sandy River Basin, Blaine Creek, Kentucky. Foundation Report. Construction of Dam and Appurtenant Works, Phase 2. Volume 1

    DTIC Science & Technology

    1990-09-01

    and grouting were performed from the rock surface using expandable-air packers . Grouting was performed by injecting, into a hole, a neat grout ( cement ...Water & cement type I & II Mix: ........................... 6:1 to 0.75:1 Connection: .................... Air packer , close to surface...pressure tested then backfilled. The holes were hydraulic-pressure tested with a single air- expanding packer near the surface at 5 psi gauge pressure. If

  9. Process for impregnating a concrete or cement body with a polymeric material

    DOEpatents

    Mattus, Alfred J.; Spence, Roger D.

    1989-01-01

    A process for impregnating cementitious solids with polymeric materials by blending polymeric materials in a grout, allowing the grout to cure, and contacting the resulting solidified grout containing the polymeric materials with an organic mixture containing a monomer, a cross-linking agent and a catalyst. The mixture dissolves the polymerized particles and forms a channel for distributing the monomer throughout the network formed by the polymeric particles. The organic components are then cured to form a substantially water-impermeable mass.

  10. Rapid Assessment of Remedial Effectiveness and Rebound in Fractured Bedrock

    DTIC Science & Technology

    2017-10-01

    Permanent 5-inch diameter steel casing was then installed to a depth of 58.3 ft-bgs, and pressure-grouted in place using cement /bentonite grout. Once the...collected from 64 feet to 78 feet bgs. A 2-inch stainless steel well, screened from 64 to 74 feet bgs, was installed within the borehole. A filter pack was...installed from 63.5 ft to 74.5 ft bgs, and the remainder of the borehole was sealed with a bentonite seal and cement /bentonite grout. Therefore

  11. Site Investigations with the Site Characterization and Analysis Penetrator System at Fort Dix, New Jersey

    DTIC Science & Technology

    1993-07-01

    rod system or through a tremie tube ; both procedures were used interchangeably at Fort Dix to demon- strate the efficiency and effectiveness of each...allows delivery through either a l/4-in.-diam grout tube or a 3/8-in.-diam rout tube . The grout used at Fort Dix consisted of a mixture of water and... microfine , blended Portland cement (Lehigh Geocem’, Leeds, Alabama). The grout is a suspension of a uniformly produced cement clinker interground with

  12. Negative grouting consequences on karst environment

    NASA Astrophysics Data System (ADS)

    Bonacci, O.; Roje-Bonacci, T.; Gottstein, S.

    2009-04-01

    Grouting is a procedure by means of which grout is injected into different kinds of karst spaces (cracks, fissures, conduits and caves). It has a wide application in modern civil engineering, especially in karst terrains. It started nearly 200 years ago. In most cases the ingredients for the preparation of mortars and grouting suspensions are: cement, bentonite, clay and fillers, additives for stability and water. In practice the composition of grouting suspension is not standardized. A suspension injected under pressure will circulate in the karst spaces like a more or less viscous fluid until some of the larger suspended particles are blocked where the karst voids get narrower than the size of injected grains. The injection of materials into karst groundwater, i.e. the construction of grouting curtains, definitely could be the cause of unpredictable negative consequences on karst groundwater environments. The building of dams in karst areas always go along the construction of grouting curtains. During the construction of most dams in karst all over the world millions tons of injection mass have been injected in karst underground. It may impact water quantity in vadose zone and in karstic aquifer causing water table lowering and spring desiccation. In such cases the negative impact on local karst environment could be very dangerous. Physically as well as chemically this mass voraciously and quickly destroyed underground habitats and killed an enormous number of endangered and endemic species. Very often this is extremely expensive procedure and in many cases not very successful from the engineering point of view. From the ecological point of view it could causes catastrophic consequences. The greatest problem is that until now neither engineers nor ecologists took care of these great and massive negative influences on underground karst environments. In this paper few examples of different consequences of grouting on the hydrogeological as well as ecological regime on karst environment in the Dinaric karst are given. The goal of this paper is to warn scientific community that is time to start with interdisciplinary research of this problem.

  13. Bond of Field-Cast Grouts to Precast Concrete Elements

    DOT National Transportation Integrated Search

    2017-01-01

    The performance of connections between prefabricated concrete elements constructed using field-cast cementitious grouts and groutlike materials is becoming a focus area for accelerated bridge construction (ABC) projects. These connections are require...

  14. Grouting applications in civil engineering. Volume I and II. [800 references

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Einstein, H.H.; Barvenik, M.J.

    1975-01-01

    A comprehensive description of grouting applications in civil engineering is presented that can serve as a basis for the selection of grouting methods in the borehole sealing problem. The breadth and depth of the study was assured by conducting the main part of the review, the collection and evaluation of information, without specifically considering the borehole sealing problem (but naturally incorporating any aspect of civil engineering applications that could be of potential use). Grouting is very much an art and not a science. In most cases, it is a trial and error procedure where an inexpensive method is initially triedmore » and then a more expensive one is used until the desired results are obtained. Once a desired effect is obtained, it is difficult to credit any one procedure with the success because the results are due to the summation of all the methods used. In many cases, the method that proves successful reflects a small abnormality in the ground or structure rather than its overall characteristics. Hence, successful grouting relies heavily on good engineering judgement and experience, and not on a basic set of standard correlations or equations. 800 references. (JRD)« less

  15. BLENDED CALCIUM ALUMINATE-CALCIUM SULFATE CEMENT-BASED GROUT FOR P-REACTOR VESSEL IN-SITU DECOMMISSIONING

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Langton, C.; Stefanko, D.

    2011-03-10

    The objective of this report is to document laboratory testing of blended calcium aluminate - calcium hemihydrate grouts for P-Reactor vessel in-situ decommissioning. Blended calcium aluminate - calcium hemihydrate cement-based grout was identified as candidate material for filling (physically stabilizing) the 105-P Reactor vessel (RV) because it is less alkaline than portland cement-based grout which has a pH greater than 12.4. In addition, blended calcium aluminate - calcium hemihydrate cement compositions can be formulated such that the primary cementitious phase is a stable crystalline material. A less alkaline material (pH {<=} 10.5) was desired to address a potential materials compatibilitymore » issue caused by corrosion of aluminum metal in highly alkaline environments such as that encountered in portland cement grouts [Wiersma, 2009a and b, Wiersma, 2010, and Serrato and Langton, 2010]. Information concerning access points into the P-Reactor vessel and amount of aluminum metal in the vessel is provided elsewhere [Griffin, 2010, Stefanko, 2009 and Wiersma, 2009 and 2010, Bobbitt, 2010, respectively]. Radiolysis calculations are also provided in a separate document [Reyes-Jimenez, 2010].« less

  16. Experience in sealing water bearing strata during deep shaft sinking

    NASA Astrophysics Data System (ADS)

    Kipko, E. Ja.; Polozov, Ju. A.; Lagunov, V. A.; Lushnikova, O. Ju.

    1984-12-01

    The paper deals with major concepts of grouting through holes drilled from the surface. The results of grouting through a single borehole at the location of two 1090 m deep shafts in Donbass are presented.

  17. Method for isolating two aquifers in a single borehole

    DOEpatents

    Burklund, P.W.

    1984-01-20

    A method for isolating and individually instrumenting separate aquifers within a single borehole is disclosed. A borehole is first drilled from the ground surface, through an upper aquifer, and into a separating confining bed. A casing, having upper and lower sections separated by a coupling collar, is lowered into the borehole. The borehole is grouted in the vicinity of the lower section of the casing. A borehole is then drilled through the grout plug and into a lower aquifer. After the lower aquifer is instrumented, the borehole is grouted back into the lower portion of the casing. Then the upper section of the casing is unscrewed via the coupling collar and removed from the borehole. Finally, instrumentation is added to the upper aquifer and the borehole is appropriately grouted. The coupling collar is designed to have upper right-hand screw threads and lower left-hand screw thread, whereby the sections of the casing can be readily separated.

  18. Method for isolating two aquifers in a single borehole

    DOEpatents

    Burklund, Patrick W.

    1985-10-22

    A method for isolating and individually instrumenting separate aquifers within a single borehole. A borehole is first drilled from the ground surface, through an upper aquifer, and into a separating confining bed. A casing, having upper and lower sections separated by a coupling collar, is lowered into the borehole. The borehole is grouted in the vicinity of the lower section of the casing. A borehole is then drilled through the grout plug and into a lower aquifer. After the lower aquifer is instrumented, the borehole is grouted back into the lower portion of the casing. Then the upper section of the casing is unscrewed via the coupling collar and removed from the borehole. Finally, instrumentation is added to the upper aquifer and the borehole is appropriately grouted. The coupling collar is designed to have upper right-hand screw threads and lower left-hand screw thread, whereby the sections of the casing can be readily separated.

  19. Ultrafine cementitious grout

    DOEpatents

    Ahrens, E.H.

    1998-07-07

    An ultrafine cementitious grout is described having a particle size 90% of which are less than 6 {micro}m in diameter and an average size of about 2.5 {micro}m or less, and preferably 90% of which are less than 5 {micro}m in diameter and an average size of about 2 {micro}m or less containing Portland cement, pumice as a pozzolanic material and superplasticizer in the amounts of about 40 wt. % to about 50 wt. % Portland cement; from about 50 wt. % to about 60 wt. % pumice containing at least 60% amorphous silicon dioxide; and from 0.1 wt. % to about 1.5 wt. % superplasticizer. The grout is mixed with water in the W/CM ratio of about 0.4--0.6/1. The grout has very high strength and very low permeability with good workability. The ultrafine particle sizes allow for sealing of microfractures below 10 {micro}m in width. 4 figs.

  20. Ultrafine cementitious grout

    DOEpatents

    Ahrens, Ernst H.

    1998-01-01

    An ultrafine cementitious grout having a particle size 90% of which are less than 6 .mu.m in diameter and an average size of about 2.5 .mu.m or less, and preferably 90% of which are less than 5 .mu.m in diameter and an average size of about 2 .mu.m or less containing Portland cement, pumice as a pozzolanic material and superplasticizer in the amounts of about 40 wt. % to about 50 wt. % Portland cement; from about 50 wt. % to about 60 wt. % pumice containing at least 60% amorphous silicon dioxide; and from 0.1 wt. % to about 1.5 wt. % superplasticizer. The grout is mixed with water in the W/CM ratio of about 0.4-0.6/1. The grout has very high strength and very low permeability with good workability. The ultrafine particle sizes allow for sealing of microfractures below 10 .mu.m in width.

  1. Efficiency of jet grout columns and sand-recycled material mixtures for mitigating liquefaction damage

    NASA Astrophysics Data System (ADS)

    Kerem Ertek, M.; Demir, Gökhan; Köktan, Utku

    2017-04-01

    Liquefaction is an important seismic phenomena that has to be assessed and consequently makes it essential to take measures in order to reduce related hazards. There are several ways to assess liquefaction potential analytically and some constitutive models implemented in FEM softwares presenting cyclic behaviour of sand making it possible to observe shear strain or excess pore pressure ratio which are measures to hold a view about liquefaction occurrence. According to various studies in the literature, post-earthquake inspections show that the measures in terms of grouting, piled rafts and sand mixtures with different non-liquefiable materials reduce liquefaction related damage. This paper aims to provide a brief information about effectiveness of jet-grout columns and recycled material-sand mixtures against liquefaction by the help of numerical analyses performed with MIDAS GTS NX software with regard to generation of shear strains. Key words: liquefaction, numerical analyses, jet-grout, sand mixtures

  2. Residence time effects on technetium reduction in slag-based cementitious materials.

    PubMed

    Arai, Yuji; Powell, Brian A; Kaplan, D I

    2018-01-15

    A long-term disposal of technetium-99 ( 99 Tc) has been considered in a type of cementitious formulation, slag-based grout, at the U.S. Department of Energy, Savannah River Site, Aiken SC, U.S.A. Blast furnace slag, which contains S and Fe electron donors, has been used in a mixture with fly ash, and Portland cement to immobilize 99 Tc(VII)O 4 - (aq) in low level radioactive waste via reductive precipitation reaction. However the long-term stability of Tc(IV) species is not clearly understood as oxygen gradually diffuses into the solid structure. In this study, aging effects of Tc speciation were investigated as a function of depth (<2.5cm) in slag-based grout using X-ray absorption spectroscopy. All of Fe(II) in solids was oxidized to Fe(III) after 117d. However, elemental S, sulfide, and sulfoxide persists at the 0-8mm depths even after 485d, suggesting the presence of a reduced zone below the surface few millimeters. Pertechnetate was successfully reduced to Tc(IV) after 29d. Distorted hydrolyzed Tc(IV) octahedral molecules were partially sulfidized and or polymerized at all depths (0-8mm) and were stable in 485d aged sample. The results of this study suggest that variable S species contribute to stabilize the partially sulfidized Tc(IV) species in aged slag-based grout. Copyright © 2017 Elsevier B.V. All rights reserved.

  3. Thermophysical parameters from laboratory measurements and tests in borehole heat exchangers

    NASA Astrophysics Data System (ADS)

    Pacetti, Chiara; Giuli, Gabriele; Invernizzi, Chiara; Chiozzi, Paolo; Verdoya, Massimo

    2017-04-01

    Besides the type of thermal regime, the performance of borehole heat exchangers relies on the overall thermal resistance of the borehole. This parameter strongly depends on the underground thermal conductivity, which accounts for most of the heat that can be extracted. The geometric configuration and the increase of thermal conductivity of the grout filling back the bore can yield a non-negligible enhancement in thermal performances. In this paper, we present a study on a pilot geothermal plant consisting of two borehole heat exchangers, 95 m deep and 9 m apart. Laboratory and in situ tests were carried out with the aim of investigating underground thermal properties, mechanisms of heat transfer and thermal characteristics of the filling grouts. Samples of grouting materials were analysed in the lab for assessing the thermal conductivity. An attempt to improve the thermal conductivity was made by doping grouts with alumina. Results showed that alumina large concentrations can increase the thermal conductivity by 25-30%. The in situ experiments included thermal logs under conditions of thermal equilibrium and thermal response tests (TRTs). The analysis of the temperature-depth profiles, based on the mass and energy balance in permeable horizons with uniform thermo-hydraulic and steady-state conditions, revealed that the underground thermal regime is dominated by conduction. TRTs were performed by injecting a constant heat rate per unit length into the boreholes for 60-90 hours. After TRTs, the temperature drop off (TDO) was recorded at 20-m-depth intervals for one week in both holes. The TRT time series were interpreted according to the classical model of the infinite line source (ILS), to infer the underground thermal conductivity. The TDO records allowed the inference of the underground thermal properties variation with depth. The results of thermal conductivity inferred with the ILS method are consistent with the values obtained from the TDO analysis.

  4. An FHWA Special Study: Post-Tensioning Tendon Grout Chloride Thresholds

    DOT National Transportation Integrated Search

    2014-05-01

    "Elevated levels of chloride were recently discovered in a commercially available pre-bagged grout product made for : post-tensioned (PT) tendons. Chloride concentrations were reported to be as high as 5.27 percent by weight of cement. : These number...

  5. Corrosion of post-tensioned tendons with deficient grout : final report.

    DOT National Transportation Integrated Search

    2016-10-20

    Recent corrosion failures of post-tensioned (PT) tendons in the Ringling Causeway Bridge (and corrosion development of PT tendons elsewhere in Florida) utilizing pre-packaged low-bleed specified grout products have spurred the need to evaluate what m...

  6. Corrosion performance of prestressing strands in contact with dissimilar grouts : technical summary.

    DOT National Transportation Integrated Search

    2013-01-01

    Inspections of post-tensioned bridges : by the Kansas Department of Transportation : have revealed voids in strand ducts due to : bleeding and shrinkage of older Portland : Cement grouts. The Kansas Department : of Transportation is faced with a deci...

  7. Installation Restoration Program. Phase II. Confirmation/Quantification Stage 2 for Griffiss Air Force Base, New York.

    DTIC Science & Technology

    1985-02-20

    Surface Cemennt/entonte Grout Rat 20/1 6" Diameter Bore "Ole 8 Foit B.G.S. Bentorito 4" Diameter POes" Schedle 409 Fee S.O.S.PVC Riser Pipe with...Casing with Locking Cap GRiser Pipe StickupGround Surface 2.2Fe Cement/BSentonite Grout Ratio 20/1 8" Diameter Bore Hole cv Ile- 3 Feet B.G.S...Ground Surface 4’. Ground Surface .0~ Cemtert/Bentonlte Grout Rat 20/1 8" Diamneter Bore Hole__ 4" Diameter Pl O Schedule 404 PVC Riser Pipe FetBGS

  8. Research on Anchorage Performance of Grouting Anchor Connection of Precast Concrete Structure

    NASA Astrophysics Data System (ADS)

    Wang, Donghui; Liu, Xudong; Wang, Sheng; Cao, Xixi

    2018-03-01

    The bonding of grouted anchor bars is one of the vertical connection forms of steel bars in fabricated concrete structures. The performance of grouted connection is mainly affected by the anchorage length and lap length of steel bars. The mechanisms of bond and anchorage between steel bar and concrete are analyzed, and the factors that influence the anchorage performance of steel bar are systematically summarized. Results show that the bond and anchorage performance of steel and concrete have been studied widely, but there are still shortcomings, and the connection forms need to be further improved.

  9. National Dam Inspection Program. Broadford Run Dam. Little Youghiogheny River Site Number 6. (NDI I.D. Number MD-361) Ohio River Basin. Broadford Run. Garrett County, Maryland. Phase I Inspection Report,

    DTIC Science & Technology

    1979-07-01

    lines, offset by 4 ft. These grout lines were drilled and grouted by the split spacing method along the centerline of the dam. Three stage grouting was...estimated as 656,000 gallons per day (450 gpm), as computed by the Darcy Short Path Method . Permeable zones in the bedrock foundation were also encountered...upstream and downstream embankments was evaluated at Sta. 11+75 (maximum section) using the Swedish Circular Arc Method . The analyses considered a 48

  10. Clean option: An alternative strategy for Hanford Tank Waste Remediation. Volume 2, Detailed description of first example flowsheet

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Swanson, J.L.

    1993-09-01

    Disposal of high-level tank wastes at the Hanford Site is currently envisioned to divide the waste between two principal waste forms: glass for the high-level waste (HLW) and grout for the low-level waste (LLW). The draft flow diagram shown in Figure 1.1 was developed as part of the current planning process for the Tank Waste Remediation System (TWRS), which is evaluating options for tank cleanup. The TWRS has been established by the US Department of Energy (DOE) to safely manage the Hanford tank wastes. It includes tank safety and waste disposal issues, as well as the waste pretreatment and wastemore » minimization issues that are involved in the ``clean option`` discussed in this report. This report describes the results of a study led by Pacific Northwest Laboratory to determine if a more aggressive separations scheme could be devised which could mitigate concerns over the quantity of the HLW and the toxicity of the LLW produced by the reference system. This aggressive scheme, which would meet NRC Class A restrictions (10 CFR 61), would fit within the overall concept depicted in Figure 1.1; it would perform additional and/or modified operations in the areas identified as interim storage, pretreatment, and LLW concentration. Additional benefits of this scheme might result from using HLW and LLW disposal forms other than glass and grout, but such departures from the reference case are not included at this time. The evaluation of this aggressive separations scheme addressed institutional issues such as: radioactivity remaining in the Hanford Site LLW grout, volume of HLW glass that must be shipped offsite, and disposition of appropriate waste constituents to nonwaste forms.« less

  11. Simulation of prepackaged grout bleed under field conditions.

    DOT National Transportation Integrated Search

    2014-04-01

    This report contains a summary of the research performed in the area of reproducing and determining the cause of soft : grout, which has been found in several PT (Post-Tensioned) tubes around the state of Florida. A modified version of the : Euronorm...

  12. CEMENTITIOUS GROUT FOR CLOSING SRS HIGH LEVEL WASTE TANKS - #12315

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Langton, C.; Burns, H.; Stefanko, D.

    2012-01-10

    In 1997, the first two United States Department of Energy (US DOE) high level waste tanks (Tanks 17-F and 20-F: Type IV, single shell tanks) were taken out of service (permanently closed) at the Savannah River Site (SRS). In 2012, the DOE plans to remove from service two additional Savannah River Site (SRS) Type IV high-level waste tanks, Tanks 18-F and 19-F. These tanks were constructed in the late 1950's and received low-heat waste and do not contain cooling coils. Operational closure of Tanks 18-F and 19-F is intended to be consistent with the applicable requirements of the Resource Conservationmore » and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and will be performed in accordance with South Carolina Department of Health and Environmental Control (SCDHEC). The closure will physically stabilize two 4.92E+04 cubic meter (1.3 E+06 gallon) carbon steel tanks and isolate and stabilize any residual contaminants left in the tanks. The closure will also fill, physically stabilize and isolate ancillary equipment abandoned in the tanks. A Performance Assessment (PA) has been developed to assess the long-term fate and transport of residual contamination in the environment resulting from the operational closure of the F-Area Tank Farm (FTF) waste tanks. Next generation flowable, zero-bleed cementitious grouts were designed, tested, and specified for closing Tanks 18-F and 19-F and for filling the abandoned equipment. Fill requirements were developed for both the tank and equipment grouts. All grout formulations were required to be alkaline with a pH of 12.4 and chemically reduction potential (Eh) of -200 to -400 to stabilize selected potential contaminants of concern. This was achieved by including Portland cement and Grade 100 slag in the mixes, respectively. Ingredients and proportions of cementitious reagents were selected and adjusted, respectively, to support the mass placement strategy developed by closure operations. Subsequent down selection was based on compressive strength and saturated hydraulic conductivity results. Fresh slurry property results were used as the first level of screening. A high range water reducing admixture and a viscosity modifying admixture were used to adjust slurry properties to achieve flowable grouts. Adiabatic calorimeter results were used as the second level screening. The third level of screening was used to design mixes that were consistent with the fill material parameters used in the F-Tank Farm Performance Assessment which was developed to assess the long-term fate and transport of residual contamination in the environment resulting from the operational closures.« less

  13. Environmental Technology Verification Report: Grouts for Wastewater Collection Systems, Avanti International AV-118 Acrylic Chemical Grout

    EPA Science Inventory

    Municipalities are discovering rapid degradation of infrastructures in wastewater collection and treatment facilities due to the infiltration of water from the surrounding environments. Wastewater facilities are not only wet, but also experience hydrostatic pressure conditions un...

  14. Measurement of rock mass deformation with grouted coaxial antenna cables

    NASA Astrophysics Data System (ADS)

    Dowding, C. H.; Su, M. B.; O'Connor, K.

    1989-01-01

    Techniques presented herein show how reflected voltage pulses from coaxial antenna cable grouted in rock masses can be employed to quantify the type and magnitude of rock mass deformation. This measurement is similar to that obtained from a combined full profile extensometer (to measure local extension) and inclinometer (to measure local shearing). Rock mass movements deform the grouted cable, which locally changes cable capacitance and thereby the reflected wave form of the voltage pulse. Thus, by monitoring changes in these reflection signatures, it is possible to monitor rock mass deformation. This paper presents laboratory measurements necessary to quantitatively interpret the reflected voltage signatures. Cables were sheared and extended to correlate measured cable deformation with reflected voltage signals. Laboratory testing included development of grout mixtures with optimum properties for field installation and performance of a TDR (Time Domain Reflectometry) monitoring system. Finally, the interpretive techniques developed through laboratory measurements were applied to previously collected field data to extract hitherto unrealized information.

  15. Direct cementitious waste option study report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dafoe, R.E.; Losinski, S.J.

    A settlement agreement between the Department of Energy (DOE) and the State of Idaho mandates that all high-level radioactive waste (HLW) now stored at the Idaho Chemical Processing Plant (ICPP) will be treated so that it is ready to be moved out of Idaho for disposal by a target data of 2035. This study investigates the direct grouting of all ICPP calcine (including the HLW dry calcine and those resulting from calcining sodium-bearing liquid waste currently residing in the ICPP storage tanks) as the treatment method to comply with the settlement agreement. This method involves grouting the calcined waste andmore » casting the resulting hydroceramic grout into stainless steel canisters. These canisters will be stored at the Idaho National Engineering and Environmental Laboratory (INEEL) until they are sent to a national geologic repository. The operating period for grouting treatment will be from 2013 through 2032, and all the HLW will be treated and in interim storage by the end of 2032.« less

  16. In-situ, time resolved monitoring of uranium in BFS:OPC grout. Part 1: Corrosion in water vapour.

    PubMed

    Stitt, C A; Paraskevoulakos, C; Banos, A; Harker, N J; Hallam, K R; Davenport, A; Street, S; Scott, T B

    2017-08-11

    Uranium encapsulated in grout was exposed to water vapour for extended periods of time. Through synchrotron x-ray powder diffraction and tomography measurements, uranium dioxide was determined the dominant corrosion product over a 50-week time period. The oxide growth rate initiated rapidly, with rates comparable to the U + H 2 O reaction. Over time, the reaction rate decreased and eventually plateaued to a rate similar to the U + H 2 O + O 2 reaction. This behaviour was not attributed to oxygen ingress, but instead the decreasing permeability of the grout, limiting oxidising species access to the metal surface.

  17. Minimizing the impact on water quality of placing grout underwater to repair bridge scour damage.

    DOT National Transportation Integrated Search

    2003-01-01

    The Virginia Department of Transportation (VDOT) has routinely used what is commonly referred to as tremie concrete (concrete or grout placed underwater by way of pumping through a metal tremie pipe) to repair bridge substructure and scour damage. VD...

  18. Effects of hydrated lime on radionuclides stabilization of Hanford tank residual waste.

    PubMed

    Wang, Guohui; Um, Wooyong; Cantrell, Kirk J; Snyder, Michelle M V; Bowden, Mark E; Triplett, Mark B; Buck, Edgar C

    2017-10-01

    Chemical stabilization of tank residual waste is part of a Hanford Site tank closure strategy to reduce overall risk levels to human health and the environment. In this study, a set of column leaching experiments using tank C-104 residual waste were conducted to evaluate the leachability of uranium (U) and technetium (Tc) where grout and hydrated lime were applied as chemical stabilizing agents. The experiments were designed to simulate future scenarios where meteoric water infiltrates through the vadose zones into the interior of the tank filled with layers of grout or hydrated lime, and then contacts the residual waste. Effluent concentrations of U and Tc were monitored and compared among three different packing columns (waste only, waste + grout, and waste + grout + hydrated lime). Geochemical modeling of the effluent compositions was conducted to determine saturation indices of uranium solid phases that could control the solubility of uranium. The results indicate that addition of hydrated lime strongly stabilized the uranium through transforming uranium to a highly insoluble calcium uranate (CaUO 4 ) or similar phase, whereas no significant stabilization effect of grout or hydrated lime was observed on Tc leachability. The result implies that hydrated lime could be a great candidate for stabilizing Hanford tank residual wastes where uranium is one of the main concerns. Published by Elsevier Ltd.

  19. Time-Lapse Electrical Resistivity Investigations for Imaging the Grouting Injection in Shallow Subsurface Cavities

    PubMed Central

    Farooq, Muhammad; Kim, Jung Ho; Song, Young Soo; Amjad Sabir, Mohammad; Umar, Muhammad; Tariq, Mohammad; Muhammad, Said

    2014-01-01

    The highway of Yongweol-ri, Muan-gun, south-western part of the South Korean Peninsula, is underlain by the abandoned of subsurface cavities, which were discovered in 2005. These cavities lie at shallow depths with the range of 5∼15 meters below the ground surface. Numerous subsidence events have repeatedly occurred in the past few years, damaging infrastructure and highway. As a result of continuing subsidence issues, the Korean Institute of Geosciences and Mineral Resources (KIGAM) was requested by local administration to resolve the issue. The KIGAM used geophysical methods to delineate subsurface cavities and improve more refined understanding of the cavities network in the study area. Cement based grouting has been widely employed in the construction industry to reinforce subsurface ground. In this research work, time-lapse electrical resistivity surveys were accomplished to monitor the grouting injection in the subsurface cavities beneath the highway, which have provided a quasi-real-time monitoring for modifying the subsurface cavities related to ground reinforcement, which would be difficult with direct methods. The results obtained from time-lapse electrical resistivity technique have satisfactory imaged the grouting injection experiment in the subsurface cavities beneath the highway. Furthermore, the borehole camera confirmed the presence of grouting material in the subsurface cavities, and hence this procedure increases the mechanical resistance of subsurface cavities below the highway. PMID:24578621

  20. Penstock leakage at the Robert Moses Niagara Power Plant - Investigation, design, and construction

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dumont, M.F.; Baker, C.H.; Broderick, W.

    1995-12-31

    This paper describes an investigation of observed penstock leakage and related gallery flooding at the Robert Moses Niagara Power Plant, in Lewiston, New York; engineering design of alternative remediation measures; test grouting of a dewatered penstock in 1991; and the subsequent grouting of the remaining twelve penstocks. The Robert Moses Niagara Power Plant is the lower part of the Niagara Pumped Storage Project, which is owned and operated by the New York Power Authority. Water diverted some 4 miles (6.4 km) upstream of the plant is passed through 13 individual penstocks 28 ft (8.5 m) in diameter to a powermore » plant on the right bank of the Niagara River. The net head at the plant is 300 ft (91.4 m), and the hydraulic capacity is about 91,000 cfs (2,575 m{sup 3}/s). The total installed capacity is about 2,000 MW. Since completion of construction in 1962 there had been recurring problems with flooding of the floors at the upper intake galleries. This was particularly noticeable during periods of heavy rainfall when the existing storm drains were close to their design capacity. The paper presents details of the investigations, including penstock inspection, methods of flow measurement and analysis, design criteria for the grout selected, details of the drilling and grout placement, and the anticipated long-term performance of the grout in service.« less

  1. Time-lapse electrical resistivity investigations for imaging the grouting injection in shallow subsurface cavities.

    PubMed

    Farooq, Muhammad; Park, Samgyu; Kim, Jung Ho; Song, Young Soo; Amjad Sabir, Mohammad; Umar, Muhammad; Tariq, Mohammad; Muhammad, Said

    2014-01-01

    The highway of Yongweol-ri, Muan-gun, south-western part of the South Korean Peninsula, is underlain by the abandoned of subsurface cavities, which were discovered in 2005. These cavities lie at shallow depths with the range of 5∼15 meters below the ground surface. Numerous subsidence events have repeatedly occurred in the past few years, damaging infrastructure and highway. As a result of continuing subsidence issues, the Korean Institute of Geosciences and Mineral Resources (KIGAM) was requested by local administration to resolve the issue. The KIGAM used geophysical methods to delineate subsurface cavities and improve more refined understanding of the cavities network in the study area. Cement based grouting has been widely employed in the construction industry to reinforce subsurface ground. In this research work, time-lapse electrical resistivity surveys were accomplished to monitor the grouting injection in the subsurface cavities beneath the highway, which have provided a quasi-real-time monitoring for modifying the subsurface cavities related to ground reinforcement, which would be difficult with direct methods. The results obtained from time-lapse electrical resistivity technique have satisfactory imaged the grouting injection experiment in the subsurface cavities beneath the highway. Furthermore, the borehole camera confirmed the presence of grouting material in the subsurface cavities, and hence this procedure increases the mechanical resistance of subsurface cavities below the highway.

  2. 77 FR 69508 - Inservice Inspection of Prestressed Concrete Containment Structures With Grouted Tendons

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-19

    ... real-time, multiple-strategy approach (i.e., appropriate grout design and installation, installed... is available in ADAMS) is provided the first time that a document is referenced. Revision 2 of... ``Regulatory Guide'' series. This series was developed to describe and make available to the public information...

  3. Development of concrete mix proportions for minimizing/eliminating shrinkage cracks in slabs and high performance grouts : final report.

    DOT National Transportation Integrated Search

    2017-02-01

    The two focus areas of this research address longstanding problems of (1) cracking of concrete slabs due to creep and shrinkage and (2) high performance compositions for grouting and joining precast concrete structural elements. Cracking of bridge de...

  4. Field testing of jet-grouted piles and drilled shafts.

    DOT National Transportation Integrated Search

    2014-01-01

    A field study of deep foundations supporting high mast lighting and signage was undertaken in typical Florida : soils. Three drilled shafts (48 in x12 ft and two 48 in x18 ft) and two jet-grouted piles (28 in x18 ft) were : constructed in Keystone He...

  5. Pre-cementation of deep shaft

    NASA Astrophysics Data System (ADS)

    Heinz, W. F.

    1988-12-01

    Pre-cementation or pre-grouting of deep shafts in South Africa is an established technique to improve safety and reduce water ingress during shaft sinking. The recent completion of several pre-cementation projects for shafts deeper than 1000m has once again highlighted the effectiveness of pre-grouting of shafts utilizing deep slimline boreholes and incorporating wireline technique for drilling and conventional deep borehole grouting techniques for pre-cementation. Pre-cementation of deep shaft will: (i) Increase the safety of shaft sinking operation (ii) Minimize water and gas inflow during shaft sinking (iii) Minimize the time lost due to additional grouting operations during sinking of the shaft and hence minimize costly delays and standing time of shaft sinking crews and equipment. (iv) Provide detailed information of the geology of the proposed shaft site. Informations on anomalies, dykes, faults as well as reef (gold bearing conglomerates) intersections can be obtained from the evaluation of cores of the pre-cementation boreholes. (v) Provide improved rock strength for excavations in the immediate vicinity of the shaft area. The paper describes pre-cementation techniques recently applied successfully from surface and some conclusions drawn for further considerations.

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pickenheim, B.; Hansen, E.; Leishear, R.

    A 10-inch READCO mixer is used for mixing the premix (45 (wt%) fly ash, 45 wt% slag, and 10 wt% portland cement) with salt solution in the Saltstone Production Facility (SPF). The Saltstone grout free falls into the grout hopper which feeds the suction line leading to the Watson SPX 100 duplex hose pump. The Watson SPX 100 pumps the grout through approximately 1500 feet of piping prior to being discharged into the Saltstone Disposal Facility (SDF) vaults. The existing grout hopper has been identified by the Saltstone Enhanced Low Activity Waste Disposal (ELAWD) project for re-design. The current nominalmore » working volume of this hopper is 12 gallons and does not permit handling an inadvertent addition of excess dry feeds. Saltstone Engineering has proposed a new hopper tank that will have a nominal working volume of 300 gallons and is agitated with a mechanical agitator. The larger volume hopper is designed to handle variability in the output of the READCO mixer and process upsets without entering set back during processing. The objectives of this task involve scaling the proposed hopper design and testing the scaled hopper for the following processing issues: (1) The effect of agitation on radar measurement. Formation of a vortex may affect the ability to accurately measure the tank level. The agitator was run at varying speeds and with varying grout viscosities to determine what parameters cause vortex formation and whether measurement accuracy is affected. (2) A dry feeds over addition. Engineering Calculating X-ESR-Z-00017 1 showed that an additional 300 pounds of dry premix added to a 300 gallon working volume would lower the water to premix ratio (W/P) from the nominal 0.60 to 0.53 based on a Salt Waste Processing Facility (SWPF) salt simulant. A grout with a W/P of 0.53 represents the upper bound of grout rheology that could be processed at the facility. A scaled amount of dry feeds will be added into the hopper to verify that this is a recoverable situation. (3) The necessity of baffles in the hopper. The preference of the facility is not to have baffles in the hopper; however, if the initial testing indicates inadequate agitation or difficulties with the radar measurement, baffles will be tested.« less

  7. Installation and use of epoxy-grouted rock anchors for skyline logging in southeast Alaska.

    Treesearch

    W.L. Schroeder; D.N. Swanston

    1992-01-01

    Field tests of the load-carrying capacity of epoxy-grouted rock anchors in poor quality bedrock on Wrangel Island in southeast Alaska demonstrated the effectiveness of rock anchors as substitutes for stump anchors for logging system guylines. Ultimate capacity depends mainly on rock hardness or strength and length of the imbedded anchor.

  8. The relationship between compressive strength and flexural strength of pavement geopolymer grouting material

    NASA Astrophysics Data System (ADS)

    Zhang, L.; Han, X. X.; Ge, J.; Wang, C. H.

    2018-01-01

    To determine the relationship between compressive strength and flexural strength of pavement geopolymer grouting material, 20 groups of geopolymer grouting materials were prepared, the compressive strength and flexural strength were determined by mechanical properties test. On the basis of excluding the abnormal values through boxplot, the results show that, the compressive strength test results were normal, but there were two mild outliers in 7days flexural strength test. The compressive strength and flexural strength were linearly fitted by SPSS, six regression models were obtained by linear fitting of compressive strength and flexural strength. The linear relationship between compressive strength and flexural strength can be better expressed by the cubic curve model, and the correlation coefficient was 0.842.

  9. Waste Management Project fiscal year 1998 multi-year work plan, WBS 1.2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jacobsen, P.H.

    The Waste Management Project manages and integrates (non-TWRS) waste management activities at the site. Activities include management of Hanford wastes as well as waste transferred to Hanford from other DOE, Department of Defense, or other facilities. This work includes handling, treatment, storage, and disposal of radioactive, nonradioactive, hazardous, and mixed solid and liquid wastes. Major Waste Management Projects are the Solid Waste Project, Liquid Effluents Project, and Analytical Services. Existing facilities (e.g., grout vaults and canyons) shall be evaluated for reuse for these purposes to the maximum extent possible.

  10. A two-stage ceramic tile grout sealing process using a high power diode laser—Grout development and materials characteristics

    NASA Astrophysics Data System (ADS)

    Lawrence, J.; Li, L.; Spencer, J. T.

    1998-04-01

    Work has been conducted using a 60 Wcw high power diode laser (HPDL) in order to determine the feasibility and characteristics of sealing the void between adjoining ceramic tiles with a specially developed grout material having an impermeable enamel surface glaze. A two-stage process has been developed using a new grout material which consists of two distinct components: an amalgamated compound substrate and a glazed enamel surface; the amalgamated compound seal providing a tough, heat resistant bulk substrate, whilst the enamel provides an impervious surface. HPDL processing has resulted in crack free seals produced in normal atmospheric conditions. The basic process phenomena are investigated and the laser effects in terms of seal morphology, composition and microstructure are presented. Also, the resultant heat affects are analysed and described, as well as the effects of the shield gases, O 2 and Ar, during laser processing. Tiles were successfully sealed with power densities as low as 500 W/cm 2 and at rates up to 600 mm/min. Contact angle measurements revealed that due to the wettability characteristics of the amalgamated oxide compound grout (AOCG), laser surface treatment was necessary in order to alter the surface from a polycrystalline to a semi-amorphous structure, thus allowing the enamel to adhere. Bonding of the enamel to the AOCG and the ceramic tiles was identified as being principally due to van der Waals forces, and on a very small scale, some of the base AOCG material dissolving into the glaze.

  11. Use of fly-ash slurry in backfill grouting in coal mines.

    PubMed

    Jiang, Ning; Zhao, Jinhai; Sun, Xizhen; Bai, Liyang; Wang, Changxiang

    2017-11-01

    Cave backfill grouting implies grouting of the caving rock mass prior to it being compacted. The filling materials strengthen the caving rock and support the overlying strata to achieve the purpose of slowing down the surface subsidence. The broken roof will fail and collapse during mining operations performed without appropriate supporting measures being taken. It is difficult to perform continuous backfill mining on the working face of such roofs using the existing mining technology. In order to solve the above problems, fly ash and mine water are considered as filling materials, and flow characteristics of fly-ash slurry are investigated through laboratory experiments and theoretical analyses. Laws governing the diffusion of fly-ash slurry in the void of caving rock masses and in the void between a caving rock mass and a basic roof are obtained and verified. Based on the results obtained from the above analyses and actual conditions at the Zhaoguan coal mine, Shandong Province, China, a cave backfill grouting system of the hauling pipeline is developed and successfully tested at the 1703 working face in the Zhaoguan coal mine. The results demonstrate that a filling rate of 43.46% is achieved, and the surface subsidence coefficient of the grouting process is found to be 0.475. Compared to the total caving method, the proposed system is found to achieve a reduction rate of 40.63%. This effectively helps in lowering the value of the surface subsidence coefficient. Fly ash and mine water, considered as primary materials in this study, also play a significant role in improving the air quality and water environment.

  12. Colour vision and light sensitivity in tunnel workers previously exposed to acrylamide and N-methylolacrylamide containing grouting agents.

    PubMed

    Goffeng, Lars Ole; Kjuus, Helge; Heier, Mona Skard; Alvestrand, Monica; Ulvestad, Bente; Skaug, Vidar

    2008-01-01

    The aim of the study was to examine possible persisting visual system effects in tunnel workers previously exposed to acrylamide and N-methylolacrylamide during grouting work. Visual field light sensitivity threshold and colour vision has been examined among 44 tunnel workers 2-10 years after exposure to acrylamide and N-methylolacrylamide containing grouting agents. Forty-four tunnel workers not involved in grouting operations served as control group. Information on exposure and background variables was obtained for all participants from a questionnaire. Visual light sensitivity threshold was measured using Humphrey Visual Field Static Perimeter 740, program 30-2 Fastpack, with red stimuli on white background, and colour vision, using Lanthony D-15 Desaturated Color test. Based on D-15d test results, colour confusion index (CCI), and a severity index (C-index) was calculated. The exposed group had a significantly higher threshold for detecting single stimuli in all parts of the inner 30 degrees of the visual field compared to the control group. The foveal threshold group difference was 1.4 dB (p=0.002) (mean value, both eyes). On the Lanthony 15 Hue Desaturated test, the exposed subjects made more errors in sorting blue colours, and a statistically significant increase in C-index was observed. Surrogate measures for duration and intensity of exposure gave no further improvement of the model. The results indicate slightly reduced light sensitivity and reduced colour discrimination among the exposed subjects compared to the controls. The findings may be due to previous exposure to acrylamide containing grouts among the tunnel workers.

  13. SIMPLE TRANSIENT CALCULATIONS OF CELL FLAMMABLE GAS CONCENTRATIONS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NOEMAIL), J; David Allison; John Mccord, J

    2009-05-06

    The Saltstone Facility at Savannah River Site (SRS) mixes low-level radiological liquid waste with grout for permanent disposal as cement in vault cells. The grout mixture is poured into each cell in approximately 17 batches (8 to 10 hours duration). The grout mixture contains ten flammable gases of concern that are released from the mixture into the cell. Prior to operations, simple parametric transient calculations were performed to develop batch parameters (including schedule of batch pours) to support operational efficiency while ensuring that a flammable gas mixture does not develop in the cell vapor space. The analysis demonstrated that amore » nonflammable vapor space environment can be achieved, with workable operational constraints, without crediting the ventilation flow as a safety system control. Isopar L was identified as the primary flammable gas of concern. The transient calculations balanced inflows of the flammable gases into the vapor space with credited outflows of diurnal breathing through vent holes and displacement from new grout pours and gases generated. Other important features of the analyses included identifying conditions that inhibited a well-mixed vapor space, the expected frequency and duration of such conditions, and the estimated level of stratification that could develop.« less

  14. Tank Closure Progress at the Department of Energy's Idaho National Engineering Laboratory Tank Farm Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lockie, K.A.; Suttora, L.C.; Quigley, K.D.

    2007-07-01

    Significant progress has been made at the U.S. Department of Energy (DOE) Idaho National Laboratory (INL) to clean and close emptied radioactive liquid waste storage tanks at the Idaho Nuclear Technology and Engineering Center (INTEC) Tank Farm Facility (TFF). The TFF includes eleven 1,135.6-kL (300,000-gal) underground stainless steel storage tanks and four smaller, 113.5-kL (30,000-gal) stainless steel tanks, along with tank vaults, interconnecting piping, and ancillary equipment. The TFF tanks have historically been used to store a variety of radioactive liquid waste, including wastes associated with past spent nuclear fuel reprocessing. Although four of the large storage tanks remain inmore » use for waste storage, the other seven 1,135.6-kL (300,000-gal) tanks and the four 113.5-kL (30,000-gal) tanks have been emptied of waste and cleaned in preparation of final closure. A water spray cleaning system was developed and deployed to clean internal tank surfaces and remove remaining tank wastes. The cleaning system was effective in removing all but a very small volume of solid residual waste particles. Recent issuance of an Amended Record of Decision (ROD) in accordance with the National Environmental Policy Act, and a Waste Determination complying with Section 3116 of the Ronald W. Reagan National Defense Authorization Act (NDAA) for Fiscal Year 2005, has allowed commencement of grouting activities on the cleaned tanks. In November 2006, three of the 113.5-kL (30,000-gal) tanks were filled with grout to provide long-term stability. It is currently planned that all seven cleaned 1,135.6-kL (300,000-gal) tanks, as well as the four 113.5-kL (30,000-gal) tanks and all associated tank vaults and interconnecting piping, will be stabilized with grout as early as 2008. (authors)« less

  15. An Investigation on the Persistence of Uranium Hydride during Storage of Simulant Nuclear Waste Packages.

    PubMed

    Stitt, C A; Harker, N J; Hallam, K R; Paraskevoulakos, C; Banos, A; Rennie, S; Jowsey, J; Scott, T B

    2015-01-01

    Synchrotron X-rays have been used to study the oxidation of uranium and uranium hydride when encapsulated in grout and stored in de-ionised water for 10 months. Periodic synchrotron X-ray tomography and X-ray powder diffraction have allowed measurement and identification of the arising corrosion products and the rates of corrosion. The oxidation rates of the uranium metal and uranium hydride were slower than empirically derived rates previously reported for each reactant in an anoxic water system, but without encapsulation in grout. This was attributed to the grout acting as a physical barrier limiting the access of oxidising species to the uranium surface. Uranium hydride was observed to persist throughout the 10 month storage period and industrial consequences of this observed persistence are discussed.

  16. An Investigation on the Persistence of Uranium Hydride during Storage of Simulant Nuclear Waste Packages

    PubMed Central

    Harker, N. J.; Hallam, K. R.; Paraskevoulakos, C.; Banos, A.; Rennie, S.; Jowsey, J.

    2015-01-01

    Synchrotron X-rays have been used to study the oxidation of uranium and uranium hydride when encapsulated in grout and stored in de-ionised water for 10 months. Periodic synchrotron X-ray tomography and X-ray powder diffraction have allowed measurement and identification of the arising corrosion products and the rates of corrosion. The oxidation rates of the uranium metal and uranium hydride were slower than empirically derived rates previously reported for each reactant in an anoxic water system, but without encapsulation in grout. This was attributed to the grout acting as a physical barrier limiting the access of oxidising species to the uranium surface. Uranium hydride was observed to persist throughout the 10 month storage period and industrial consequences of this observed persistence are discussed. PMID:26176551

  17. Preparation of grout for stabilization of abandoned in-situ oil shale retorts

    DOEpatents

    Mallon, Richard G.

    1982-01-01

    A process for the preparation of grout from burned shale by treating the burned shale in steam at approximately 700.degree. C. to maximize the production of the materials alite and larnite. Oil shale removed to the surface during the preparation of an in-situ retort is first retorted on the surface and then the carbon is burned off, leaving burned shale. The burned shale is treated in steam at approximately 700.degree. C. for about 70 minutes. The treated shale is then ground and mixed with water to produce a grout which is pumped into an abandoned, processed in-situ retort, flowing into the void spaces and then bonding up to form a rigid, solidified mass which prevents surface subsidence and leaching of the spent shale by ground water.

  18. Pressurized grout remote backfilling at AML sites near Beulah and Zap, North Dakota

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weiner, E.J.; Dodd, W.E.

    1999-07-01

    The Abandoned Mine Lands (AML) Division of the North Dakota Public Service Commission (PSC) is charged with the reclamation of hazardous abandoned mine sites in North Dakota. Several underground lignite coalmines were operated near the cities of Beulah and Zap, North Dakota, from the early 1900's until about 1955. Coal seams in this area were relatively thick and the overburden generally shallow. As these mines have deteriorated with time, deep collapse features, or sinkholes, have surfaced in many areas. These features are very dangerous, especially when they occur at or near residential and commercial areas and public roads. In themore » past five years, sinkholes have surfaced beneath a commercial building (boat dealership, lounge, and gas station) and beneath a nearby occupied mobile home north of Beulah. sinkholes have also surfaced near KHOL Radio Station in Beulah and in the right of way of a public road south of Zap. The AML Division has conducted several emergency sinkhole-filling projects in these areas. In 1995--97, the AML Division conducted exploratory drilling which confirmed the presence of collapsing underground mines at these sites. The remediation of these sites around Beulah/Zap will take place over several years and involve three or more separate contracts due to budget considerations. In 1997, the AML Division began reclamation at these sties utilizing pressurized grout remote backfilling. In this technique, a cementitious grout is pumped through cased drill holes directly into the mine cavities to fill them and thereby stabilize the surface from collapse. The successful contractor for Phase One of the project was The Concrete Doctor, Inc. (TCDI). This paper will concentrate on Phase One of this work performed from June through September 1997. This project is especially interesting because grout was pumped through holes drilled inside the occupied commercial building. Grout was also pumped through angled holes that intercepted mined workings directly beneath the structure. Several specialized monitoring techniques were used to alert contractor if any movement in the structures occurred during grouting activities. Informational meetings were conducted by TCDI and PDC held with landowners, business owners, residents and road authorities before, during and after the project.« less

  19. Recycle of Zirconium from Used Nuclear Fuel Cladding: A Major Element of Waste Reduction

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Collins, Emory D; DelCul, Guillermo D; Terekhov, Dmitri

    2011-01-01

    Feasibility tests were initiated to determine if the zirconium in commercial used nuclear fuel (UNF) cladding can be recovered in sufficient purity to permit re-use, and if the recovery process can be operated economically. Initial tests are being performed with unirradiated, non-radioactive samples of various types of Zircaloy materials that are used in UNF cladding to develop the recovery process and determine the degree of purification that can be obtained. Early results indicate that quantitative recovery can be accomplished and product contamination with alloy constituents can be controlled sufficiently to meet purification requirements. Future tests with actual radioactive UNF claddingmore » are planned. The objective of current research is to determine the feasibility of recovery and recycle of zirconium from used fuel cladding wastes. Zircaloy cladding, which contains 98+% of hafnium-free zirconium, is the second largest mass, on average {approx}25 wt %, of the components in used U.S. light-water-reactor fuel assemblies. Therefore, recovery and recycle of the zirconium would enable a large reduction in geologic waste disposal for advanced fuel cycles. Current practice is to compact or grout the cladding waste and store it for subsequent disposal in a geologic repository. This paper describes results of initial tests being performed with unirradiated, non-radioactive samples of various types of Zircaloy materials that are used in UNF cladding to develop the recovery process and determine the degree of purification that can be obtained. Future tests with actual radioactive UNF cladding are planned.« less

  20. Injection of coal combustion byproducts into the Omega Mine for the reduction of acid mine drainage

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gray, T.A.; Moran, T.C.; Broschart, D.W.

    1998-12-31

    The Omega Mine Complex is located outside of Morgantown, West Virginia. The mine is in the Upper Freeport Coal, an acid-producing coal seam. The coal was mined in a manner that has resulted in acid mine drainage (AMD) discharges at multiple points. During the 1990`s, the West Virginia Division of Environmental Protection (WVDEP) assumed responsibility for operating a collection and treatment system for the AMD. Collection and treatment costs are approximately $300,000 per year. An innovative procedure of injecting grout into the mine workings to reduce AMD and the resulting treatment costs is proposed. The procedure involves injecting grout mixesmore » composed primarily of coal combustion byproducts (CCB`s) and water, with a small quantity of cement. The intention of the injection program is to fill the mine voids in the north lobe of the Omega Mine (an area where most of the acidity is believed to be generated) with the grout, thus reducing the contact of air and water with potentially acidic material. The grout mix design consists of an approximate 1:1 ratio of fly ash to byproducts from fluidized bed combustion. Approximately 100 gallons of water per cubic yard of grout is used to help achieve flowability. Observation of the mine workings via subsurface borings and downhole video camera operation confirmed that first-mined areas were generally open while second-mined areas were generally partially collapsed. Closer injection hole spacing was used in second-mined areas to account for collapsed workings. The construction documents have been prepared with the project being bid in late 1997. The engineer`s cost estimate was approximately $2,500,000, with the low bid of approximately $2,300,000 being submitted by Howard Concrete Pumping of Bridgeville, PA.« less

  1. The grout/glass performance assessment code system (GPACS) with verification and benchmarking

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Piepho, M.G.; Sutherland, W.H.; Rittmann, P.D.

    1994-12-01

    GPACS is a computer code system for calculating water flow (unsaturated or saturated), solute transport, and human doses due to the slow release of contaminants from a waste form (in particular grout or glass) through an engineered system and through a vadose zone to an aquifer, well and river. This dual-purpose document is intended to serve as a user`s guide and verification/benchmark document for the Grout/Glass Performance Assessment Code system (GPACS). GPACS can be used for low-level-waste (LLW) Glass Performance Assessment and many other applications including other low-level-waste performance assessments and risk assessments. Based on all the cses presented, GPACSmore » is adequate (verified) for calculating water flow and contaminant transport in unsaturated-zone sediments and for calculating human doses via the groundwater pathway.« less

  2. Method of Remotely Constructing a Room

    DOEpatents

    Michie, J. D.; De Hart, R. C.

    1971-10-05

    The testing of nuclear devices of high explosive yield has required that cavities of relatively large size be provided at considerable distances below the surface of the earth for the pre-detonation emplacement of the device. The construction of an essentially watertight chamber or room in the cavity is generally required for the actual emplacement of the device. A method is described of constructing such a room deep within the earth by personnel at the surface. A dual wall bladder of a watertight, pliable fabric material is lowered down a shaft into a selected position. The bladder is filled with a concrete grout while a heavy fluid having essentially the same density as the grout is maintained on both sides of the bladder, to facilitate complete deployment of the bladder by the grout to form a room of desired configuration. (10 claims)

  3. Method of remotely constructing a room

    DOEpatents

    Michie, J.D.; De Hart, R.C.

    1971-10-05

    The testing of nuclear devices of high explosive yield has required that cavities of relatively large size be provided at considerable distances below the surface of the earth for the pre-detonation emplacement of the device. The construction of an essentially watertight chamber or room in the cavity is generally required for the actual emplacement of the device. A method is described of constructing such a room deep within the earth by personnel at the surface. A dual wall bladder of a watertight, pliable fabric material is lowered down a shaft into a selected position. The bladder is filled with a concrete grout while a heavy fluid having essentially the same density as the grout is maintained on both sides of the bladder, to facilitate complete deployment of the bladder by the grout to form a room of desired configuration. (10 claims)

  4. Preparation of grout for stabilization of abandoned in-situ oil shale retorts. [Patent application

    DOEpatents

    Mallon, R.G.

    1979-12-07

    A process is described for the preparation of grout from burned shale by treating the burned shale in steam at approximately 700/sup 0/C to maximize the production of the materials alite and larnite. Oil shale removed to the surface during the preparation of an in-situ retort is first retorted on the surface and then the carbon is burned off, leaving burned shale. The burned shale is treated in steam at approximately 700/sup 0/C for about 70 minutes. The treated shale is then ground and mixed with water to produce a grout which is pumped into an abandoned, processed in-situ retort, flowing into the void spaces and then bonding up to form a rigid, solidified mass which prevents surface subsidence and leaching of the spent shale by ground water.

  5. Detecting grouting quality of tendon ducts using the impact-echo method

    NASA Astrophysics Data System (ADS)

    Qu, Guangzhen; Sun, Min; Zhou, Guangli

    2018-06-01

    The performance, durability and safety of prestressed concrete bridge were directly affected by the compaction of prestressed pipe. However, the pipe was hidden in the beam, and its grouting density was difficult to detect. The paper had modified three different status of gouting quality through making test model. After that, the impact-Echo method was adopted to detect the grouting quality of tendon ducts, the study was sunmmarized as follow. If the reflect time of slab bottom and nominal thickness of slab increased, the degree of density will increase; testing from half-hole of web, the reflect time and nominal thickness of slab was biggest. At the same time, the reflect time of compacted and uncompacted tendon ducts were mainly. At last, the method was verified by the engineering project, which provided reference value.

  6. Integrity assessment of grouted posttensioning cables and reinforced concrete of a nuclear containment building

    NASA Astrophysics Data System (ADS)

    Philipose, K.; Shenton, B.

    2011-04-01

    The Containment Buildings of CANDU Nuclear Generating Stations were designed to house nuclear reactors and process equipment and also to provide confinement of releases from a potential nuclear accident such as a Loss Of Coolant Accident (LOCA). To meet this design requirement, a post-tensioning system was designed to induce compressive stresses in the structure to counteract the internal design pressure. The CANDU reactor building at Gentilly-1 (G-1), Quebec, Canada (250 MWe) was built in the early 1970s and is currently in a decommissioned state. The structure at present is under surveillance and monitoring. In the year 2000, a field investigation was conducted as part of a condition assessment and corrosion was detected in some of the grouted post-tension cable strands. However, no further work was done at that time to determine the cause, nature, impact and extent of the corrosion. An investigation of the Gentilly-1 containment building is currently underway to assess the condition of grouted post-tensioning cables and reinforced concrete. At two selected locations, concrete and steel reinforcements were removed from the containment building wall to expose horizontal cables. Individual cable strands and reinforcement bars were instrumented and measurements were taken in-situ before removing them for forensic examination and destructive testing to determine the impact of ageing and corrosion. Concrete samples were also removed and tested in a laboratory. The purpose of the field investigation and laboratory testing, using this structure as a test bed, was also to collect material ageing data and to develop potential Nondestructive Examination (NDE) methods to monitor Containment Building Integrity. The paper describes the field work conducted and the test results obtained for concrete, reinforcement and post-tensioning cables.

  7. Properties of Tuffs, Grout and Other Materials.

    DTIC Science & Technology

    1982-01-01

    analysis , and tested in uniaxial strain. Table 2 presents the physical properties, ultrasonic data, and the per- manent volume compaction resulting from the... methods provide an accuracy of ±2% on pressure and stress measure- ments. Strain Measurements - Strains are measured using cantilever arms inside the...that are used in nuclear blast effects analysis , and specifically to assist in the analysis of the grout sphere explosive tests being conducted by the

  8. Using Frozen Barriers for Containment of Contaminants

    DTIC Science & Technology

    2017-09-21

    barriers are constructed of grout slurry and plastic or steel sheet pilings. Circumferential barriers can be used to completely enclose a source of...2.1.1 Slurry walls A soil-bentonite slurry trench cutoff wall (slurry wall) is excavated and backfilled with grout, cement , or soil-bentonite...installation requires a mixing area, and there is a substantial amount of excavation and the need to dispose of spoil. The advantages of cement -based

  9. Long-Term Behaviour of Fly Ash and Slag Cement Grouts for Micropiles Exposed to a Sulphate Aggressive Medium.

    PubMed

    Ortega, José Marcos; Esteban, María Dolores; Rodríguez, Raúl Rubén; Pastor, José Luis; Ibanco, Francisco José; Sánchez, Isidro; Climent, Miguel Ángel

    2017-05-30

    Nowadays, one of the most popular ways to get a more sustainable cement industry is using additions as cement replacement. However, there are many civil engineering applications in which the use of sustainable cements is not extended yet, such as special foundations, and particularly micropiles, even though the standards do not restrict the cement type to use. These elements are frequently exposed to the sulphates present in soils. The purpose of this research is to study the effects in the very long-term (until 600 days) of sulphate attack in the microstructure of micropiles grouts, prepared with ordinary Portland cement, fly ash and slag commercial cements, continuing a previous work, in which these effects were studied in the short-term. The microstructure changes have been analysed with the non-destructive impedance spectroscopy technique, mercury intrusion porosimetry and the "Wenner" resistivity test. The mass variation and the compressive strength have also been studied. The impedance spectroscopy has been the most sensitive technique for following the sulphate attack process. Considering the results obtained, micropiles grouts with slag and fly ash, exposed to an aggressive medium with high content of sulphates, have shown good behaviour in the very long-term (600 days) compared to grouts made with OPC.

  10. Long-Term Behaviour of Fly Ash and Slag Cement Grouts for Micropiles Exposed to a Sulphate Aggressive Medium

    PubMed Central

    Ortega, José Marcos; Esteban, María Dolores; Rodríguez, Raúl Rubén; Pastor, José Luis; Ibanco, Francisco José; Sánchez, Isidro; Climent, Miguel Ángel

    2017-01-01

    Nowadays, one of the most popular ways to get a more sustainable cement industry is using additions as cement replacement. However, there are many civil engineering applications in which the use of sustainable cements is not extended yet, such as special foundations, and particularly micropiles, even though the standards do not restrict the cement type to use. These elements are frequently exposed to the sulphates present in soils. The purpose of this research is to study the effects in the very long-term (until 600 days) of sulphate attack in the microstructure of micropiles grouts, prepared with ordinary Portland cement, fly ash and slag commercial cements, continuing a previous work, in which these effects were studied in the short-term. The microstructure changes have been analysed with the non-destructive impedance spectroscopy technique, mercury intrusion porosimetry and the “Wenner” resistivity test. The mass variation and the compressive strength have also been studied. The impedance spectroscopy has been the most sensitive technique for following the sulphate attack process. Considering the results obtained, micropiles grouts with slag and fly ash, exposed to an aggressive medium with high content of sulphates, have shown good behaviour in the very long-term (600 days) compared to grouts made with OPC. PMID:28772958

  11. PSU/WES Interlaboratory Comparative Methodology Study of an Experimental Cementitious Repository Seal Material. Report 2. Final Results.

    DTIC Science & Technology

    1982-03-01

    meter 25 11.0 Microstructure by SEM 11.1 Introduction In order to correlate observed physical and mechanical properties in cured grout samples, a...studied at the two laboratories has proper physical properties , phase composi- tions, and microstructures for the materials used and ages covered...Scanning Electron Microscope Resolution Test Specimen ( Al -W) D. B. Ballard Research Material 100 SEM Resolution Test Specimen (AI-W)., is an alloy of

  12. Rock Testing Handbook (Test Standards 1993)

    DTIC Science & Technology

    1993-01-01

    surface. ergy lost due to nonuniformity of mediums. progressive failure-formation and development of localized refusal-in grouting, when the rate of...the components of mixed grout, resulting in nonuniform across which it acts. (ISRM) proportions in the mass. shear plane-a plane along which failure of...responr, le techndcal commttee, which you may attend if you teel mt your comments have not received a lair heating you should make your views known to the

  13. Settlement mechanism of piled-raft foundation due to cyclic train loads and its countermeasure

    NASA Astrophysics Data System (ADS)

    Gu, Linlin; Ye, Guanlin; Wang, Zhen; Ling, Xianzhang; Zhang, Feng

    2017-07-01

    In this paper, numerical simulation with soil-water coupling finite element-finite difference (FE-FD) analysis is conducted to investigate the settlement and the excess pore water pressure (EPWP) of a piled-raft foundation due to cyclic high-speed (speed: 300km/h) train loading. To demonstrate the performance of this numerical simulation, the settlement and EPWP in the ground under the train loading within one month was calculated and confirmed by monitoring data, which shows that the change of the settlement and EPWP can be simulated well on the whole. In order to ensure the safety of train operation, countermeasure by the fracturing grouting is proposed. Two cases are analyzed, namely, grouting in No-4 softest layer and No-9 pile bearing layer respectively. It is found that fracturing grouting in the pile bearing layer (No-9 layer) has better effect on reducing the settlement.

  14. Method and apparatus for constructing an underground barrier wall structure

    DOEpatents

    Dwyer, Brian P.; Stewart, Willis E.; Dwyer, Stephen F.

    2002-01-01

    A method and apparatus for constructing a underground barrier wall structure using a jet grout injector subassembly comprising a pair of primary nozzles and a plurality of secondary nozzles, the secondary nozzles having a smaller diameter than the primary nozzles, for injecting grout in directions other than the primary direction, which creates a barrier wall panel having a substantially uniform wall thickess. This invention addresses the problem of the weak "bow-tie" shape that is formed during conventional jet injection when using only a pair of primary nozzles. The improvement is accomplished by using at least four secondary nozzles, of smaller diameter, located on both sides of the primary nozzles. These additional secondary nozzles spray grout or permeable reactive materials in other directions optimized to fill in the thin regions of the bow-tie shape. The result is a panel with increased strength and substantially uniform wall thickness.

  15. Grout Impregnation of Pre-Placed Recycled Concrete Pavement (RCP) for Rapid Repair of Deteriorated Portland Cement Concrete Airfield Pavement

    DTIC Science & Technology

    2007-04-01

    generation, to reduce the amount of cement required, and to provide additional tensile strength to the concrete. Although there was limited success with...generally less workable and requires more cement due to the increased water requirements. He further states that with the equipment currently...52- Table 9. Results of the Type III Grout Scoping Study Mixture Water Cement Ratio Sand Replicate Compressive Strength MPa (psi) Flow Cone

  16. Operation and Maintenance Manual, Melvern Lake, Marais des Cygnes River, Kansas. Appendix V. Embankment Criteria and Performance Report.

    DTIC Science & Technology

    1982-08-01

    of Dam Profile and Embankment Section 0-5-1343 Right Abutment 4 Embankment Sections Conduit and Transitions 0-5-1344 5 Embankment Sections Valley and...Cook Construction Company of Jackson, Mississippi. The drilling and grouting for the grout curtain was accomplished by subcontractor, Golden Drilling... Company of Golden, Colorado. The concrete structures for outlet works and stilling basin were done by subcontractor, Bushman Construction Company of

  17. Anchorage performance of a high-pressure pre-tightening resin anchor with a compressed grouting body

    PubMed Central

    Tian, Jiansheng; Hu, Li

    2017-01-01

    Supports for deep mine roadways located in soft surrounding rock face several problems: difficulty in applying pre-tightening force, low bearing capacity, and poor initial support. To solve these problems, this study proposes a high-pressure pre-tightening resin anchor with a compressed grouting body for use in soft and fractured rock surrounding a deep roadway. Using model experiments, we analyzed the anchorage performance of the proposed anchor and a conventional tensile-type anchor for three different values of the elastic modulus of the surrounding rock. The results showed that regardless of the surrounding rock type, the peak micro-strain (642–541) and displacement (6.09–6.5 mm) at the pull-out end of the proposed anchor were always smaller than the peak micro-strain (1433–1105) and displacement (8.77–9.2 mm) at the pull-out end of the conventional anchor. Furthermore, as the anchor’s pre-tightening force increased from 20 kN to 120 kN, the anchor’s strain remained concentrated over a length of 0.4 m from the bearing end. Compared with conventional tensile-type anchors, the proposed high-pressure pre-tightening resin anchor with a compressed grouting body has a higher ultimate bearing capacity, allows the grouting length to be decreased to 0.4 m, and provides initial support resistance. PMID:28196084

  18. Foundation Report, Dam & Spillway, Taylorsville Lake, Ohio River Basin, Salt River, Kentucky.

    DTIC Science & Technology

    1983-04-01

    methods. The spacing of the primary holes was set on 10- foot centers, followed by secondary holes on 5- foot centers and tertiary holes on 2.5- foot ...88’ and 5+00. This area was further divided into 100- foot sections and drilled and grouted in alternating sections. Sections 7, 9 and 5 were drilled...100- foot sections and grouted by alternate sections to preclude violating the 100- foot spacing requirement. Many of the first holes on the left abutment

  19. Effects of remedial grouting on the ground-water flow system at Red Rock Dam near Pella, Iowa

    USGS Publications Warehouse

    Linhart, S. Mike; Schaap, Bryan D.

    2001-01-01

    Hydrographs, statistical analysis of waterlevel data, and water-chemistry data suggest that underseepage on the northeast side of the dam has been reduced but not completely eliminated. Some areas appear to have been affected to a greater degree and for a longer period of time than other areas. Future monitoring of water levels, water chemistry, and stable isotopes can aid in the evaluation of the long-term effectiveness of remedial grouting.

  20. Heat of Hydration of Low Activity Cementitious Waste Forms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nasol, D.

    2015-07-23

    During the curing of secondary waste grout, the hydraulic materials in the dry mix react exothermally with the water in the secondary low-activity waste (LAW). The heat released, called the heat of hydration, can be measured using a TAM Air Isothermal Calorimeter. By holding temperature constant in the instrument, the heat of hydration during the curing process can be determined. This will provide information that can be used in the design of a waste solidification facility. At the Savannah River National Laboratory (SRNL), the heat of hydration and other physical properties are being collected on grout prepared using three simulantsmore » of liquid secondary waste generated at the Hanford Site. From this study it was found that both the simulant and dry mix each had an effect on the heat of hydration. It was also concluded that the higher the cement content in the dry materials mix, the greater the heat of hydration during the curing of grout.« less

  1. CsIX/TRU Grout Feasibility Study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    S. J. Losinski; C. M. Barnes; B. K. Grover

    A settlement agreement between the Department of Energy (DOE) and the State of Idaho mandates that liquid waste now stored at the Idaho Nuclear Technology Engineering Center (INTEC - formerly the Idaho Chemical Processing Plant, ICPP) will be calcined by the end of year 2012. This study investigates an alternative treatment of the liquid waste that removes undissolved solids (UDS) by filtration and removes cesium by ion exchange followed by cement-based grouting of the remaining liquid into 55-gal drums. Operations are assumed to be from January 2008 through December 2012. The grouted waste will be contact-handled and will be shippedmore » to the Waste Isolation Pilot Plant (WIPP) in New Mexico for disposal. The small volume of secondary wastes such as the filtered solids and cesium sorbent (resin) would remain in storage at the Idaho National Engineering and Environmental Laboratory for treatment and disposal under another project, with an option to dispose of the filtered solids as a r emote-handled waste at WIPP.« less

  2. Clay-cement suspensions - rheological and functional properties

    NASA Astrophysics Data System (ADS)

    Wojcik, L.; Izak, P.; Mastalska-Poplawska, J.; Gajek, M.

    2017-01-01

    The piping erosion in soil is highly unexpected in civil engineering. Elimination of such damages is difficult, expensive and time-consuming. One of the possibility is the grouting method. This method is still developed into direction of process automation as well as other useful properties of suspensions. Main way of modernization of the grouting method is connected it with rheology of injection and eventuality of fitting them to specific problems conditions. Very popular and useful became binders based on modified clays (clay-cement suspensions). Important principle of efficiency of the grouting method is using of time-dependent pseudothixotropic properties of the clay-cement suspensions. The pseudo-rheounstability aspect of the suspensions properties should be dedicated and fitted to dynamic changes of soil conditions destructions. Whole process of the modification of the suspension rheology is stimulated by the specific agents. This article contains a description of practical aspects of the rheological parameters managing of the clay-cement suspensions, dedicated to the building damages, hydrotechnic constructions etc.

  3. Physical barriers formed from gelling liquids: 1. numerical design of laboratory and field experiments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Finsterle, S.; Moridis, G.J.; Pruess, K.

    1994-01-01

    The emplacement of liquids under controlled viscosity conditions is investigated by means of numerical simulations. Design calculations are performed for a laboratory experiment on a decimeter scale, and a field experiment on a meter scale. The purpose of the laboratory experiment is to study the behavior of multiple gout plumes when injected in a porous medium. The calculations for the field trial aim at designing a grout injection test from a vertical well in order to create a grout plume of a significant extent in the subsurface.

  4. Repair, Evaluation, Maintenance, and Rehabilitation Research Program. State-of-the-Art Procedures for Sealing Coastal Structures with Grouts and Concretes

    DTIC Science & Technology

    1989-04-01

    the shape it had as it was ex- truded from the grout tube . Figure 3 shows the type of voids in which the ma- terial is expected to form a barrier...has promising characteristics for coastal engi- neering applications. Microfine Cement, a company which markets ultrafine ce- ment, claims the product...can penetrate fine sand, and is strong and durable with a 4- to 5-hr set time. Fifty percent of Microfine Cement’s particles are less than 4 microns

  5. Alternate paddle configuration for improved wear resistance in the saltstone mixer

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reigel, M.; Fowley, M.

    The Saltstone Production Facility has a 10-inch Readco-Kurimoto continuous mixer that mixes the premix dry feeds and low-level waste salt solution to make fresh (uncured) saltstone. Inspection of the mixer in January 2013 showed significant wear on the third, fourth and fifth paddle pairs after the conveying augers. A 2-inch Readco-Kurimoto continuous mixer was used to test alternate paddle configurations for use in the 10-inch mixer to decrease the wear rate on the paddles. Two wear tests were conducted to investigate a method of reducing wear on the mixer paddles. The first test (wear test 2a) had a paddle configurationmore » similar to the currently installed 10-inch mixer in the SPF. This test established baseline wear. The second test (wear test 2b) had a reconfigured paddle arrangement that replaced the flat paddles with helical paddles for paddle pairs 2 - 6 and aligned paddle pair 1 with the augers. The intent of the reconfiguration was to more effectively convey the partially wetted dry feeds through the transition region and into the liquid feed where paddle wear is reduced due to dry feeds and salt solution being mixed at the intended water to premix ratio. The design of the helical paddles provides conveyance through the transition region to the liquid feed inlet. The alignment with the auger is aimed to provide a smoother transition (minimizing the discontinuity between the auger and paddle pair 1) into the downstream paddles. A soft metal with low wear resistance (6000 series aluminum) was used for the wear testing paddles to determine wear patterns while minimizing run time and maximizing wear rate. For the two paddle configurations tested using the scaled 2-inch Readco-Kurimoto continuous mixer, with the first six paddles after the augers replaced by the wear paddles and the remaining paddles were stainless steel. Since the 10-inch SPF mixer is designed with the liquid inlet centered over paddle pairs 5 and 6, the scaled 2-inch mixer was configured the same way. The wear rate from wear test 2a was approximately double the wear rate from wear test 2b for paddle pairs 4 and 5. For both configurations, there was little or no wear on paddle pairs 1, 2, 3 and 6 based on mass change, indicating that the un-wetted and fully wetted premix materials cause less wear than the partially wetted premix. Additionally, inspection of the wear surface of the paddles showed more deformation on the flat paddles than the helical paddles which was consistent with the wear rates. Aligning of the auger discharge flight with paddle pair 1 resulted in a lower wear rate paddle pair 1 rather than having them misaligned with the feed augers. During the paddle wear tests, polishing wear was observed on the inside barrel of the mixer. The polishing wear is evident on the upper housing clamshell and the lower housing clamshell primarily at paddle pairs 4 and 5, which is the transition region of the mixer. Wear on the mixer barrel increases the space between the paddles and the barrel, resulting in increased grout build up on the barrel. Since the mixer barrel cannot be reconfigured or replaced in the SPF, the method for mitigating wear on the barrel is to move the more viscous grout through the transition region as quickly as possible. In addition, the location of the liquid inlet does not allow for sufficient cleaning of the mixer since residual grout remains on paddle pairs 1 - 4. As the paddles continue to wear and the self-cleaning capability of the paddles is lost, the lack of sufficient flushing would aid in grout build up between the barrel and the paddles which could eventually lead to decreased throughput capacity of the dry feeds. Changing the paddle configuration from flat to helical resulted in no change to the rheological properties of the grout mixture. Both tests produced a grout that is within the processing range of the SPF. Based on the results of this testing, it is recommended for the currently installed SPF mixer that paddle pairs 1 through 6 be helical rather than flat, with the paddle pair 1 aligned with the feed augers in order to minimize the wear occurring in the SPF mixer. Based on the results of this testing, it is recommended that the mixer be inspected and critical measurements be taken whenever the SPF processing schedule allows in order to establish a wear rate of the 10-inch mixer paddles.5 Based on these measurements, the lifetime of paddles in the transition region can be established in order to set up a maintenance schedule for the mixer. Since replacing the entire mixer is very expensive and time intensive, replacing the worn paddles after a specific time period would allow for planned shutdowns as well as process optimization such that the mixer throughput is not compromised. In addition, further testing should be performed to determine an alternate liquid inlet location to better flush the mixer of residual grout at the end of processing. Sufficiently cleaning the mixer will help eliminate another potential source of wear. Another potential method for reducing the wear rate in the mixer is to reduce the mixer speed without affecting the throughput capacity. Since wear rate is a function of impact velocity of the grout and mixing paddles, testing could be done using the 2-inch mixer determine the optimum mixer speed to reduce wear but not adversely impact facility operations (e.g. throughput capacity and grout properties).« less

  6. Grouted pile to sleeves connections: Design provisions for the new ISO Standard for offshore structures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harwood, R.G.; Billington, C.J.; Buitrago, J.

    1996-12-01

    A Technical Core Group (TCG) was set up in March 1994 to review the design practice provisions for grouted pile to sleeve connections, mechanical connections and repairs as part of the international harmonization process for the new ISO Standard, ISO 13819-2, Petroleum and Natural Gas Industries--Offshore Structures, Part 2: Fixed Steel Structures. This paper provides an overview of the development of the proposed new design provisions for grouted connections including, the gathering and screening of the data, the evolution of the design formulae, and the evaluation of the resistance factor. Detailed comparisons of the new formulae with current design practicemore » (API, HSE and DnV) are also included. In the development of the new provisions the TCG has been given access to the largest database ever assembled on this topic. This database includes all the major testing programs performed over the last 20 years, and recent UK and Norwegian research projects not previously reported. The limitations in the database are discussed and the areas where future research would be of benefit are highlighted.« less

  7. A multiscale approach to determine hydraulic conductivity in thick claystone aquitards using field, laboratory, and numerical modeling methods

    NASA Astrophysics Data System (ADS)

    Smith, L. A.; Barbour, S. L.; Hendry, M. J.; Novakowski, K.; van der Kamp, G.

    2016-07-01

    Characterizing the hydraulic conductivity (K) of aquitards is difficult due to technical and logistical difficulties associated with field-based methods as well as the cost and challenge of collecting representative and competent core samples for laboratory analysis. The objective of this study was to produce a multiscale comparison of vertical and horizontal hydraulic conductivity (Kv and Kh, respectively) of a regionally extensive Cretaceous clay-rich aquitard in southern Saskatchewan. Ten vibrating wire pressure transducers were lowered into place at depths between 25 and 325 m, then the annular was space was filled with a cement-bentonite grout. The in situ Kh was estimated at the location of each transducer by simulating the early-time pore pressure measurements following setting of the grout using a 2-D axisymmetric, finite element, numerical model. Core samples were collected during drilling for conventional laboratory testing for Kv to compare with the transducer-determined in situ Kh. Results highlight the importance of scale and consideration of the presence of possible secondary features (e.g., fractures) in the aquitard. The proximity of the transducers to an active potash mine (˜1 km) where depressurization of an underlying aquifer resulted in drawdown through the aquitard provided a unique opportunity to model the current hydraulic head profile using both the Kh and Kv estimates. Results indicate that the transducer-determined Kh estimates would allow for the development of the current hydraulic head distribution, and that simulating the pore pressure recovery can be used to estimate moderately low in situ Kh (<10-11 m s-1).

  8. Evaluation of DSS-14 pedestal-review of top surface repair procedures

    NASA Technical Reports Server (NTRS)

    Oesterle, R. G.; Musser, D. W.; Salse, E. A. B.

    1983-01-01

    Proposed repair procedures for the top surface of the pedestal supporting the hydrostatic bearing runner for the 64m Antenna are presented. These procedures included: (1) removal of existing grout and concrete to approximately 8 in. below original concrete surface using a presplitting technique with expansive cement followed by secondary breaking; (2) preparation of exposed concrete surface including an epoxy bonding agent; and (3) replacement of material removed with 8 in. of new concrete surface including an epoxy bonding agent; and (4) replacement of material removed with 8 in. of new concrete and 4 in. of new grout.

  9. Soil Improvement By Jet Grout Method And Geogrid Against Liquefaction: Example Of Samsun-Tekkeköy

    NASA Astrophysics Data System (ADS)

    Öztürk, Seda; Banu İkizler, S.; Şadoǧlu, Erol; Dadaşbilge, Ozan; Angın, Zekai

    2017-04-01

    Liquefaction that occurs due to cyclic and temporary loads on non-cohesive and water-logged sandy soil during earthquake causes considerable loss of lives and property in Turkey and the world. Turkey is a country of which a major part of territories is under earthquake risk due to its tectonic characteristics. Therefore, necessary precautions should be taken against possible disasters such as earthquakes that cannot be prevented in existing conditions. This study focuses on soil improvement applications for a site, located in the influence area of the North Anatolian Fault Zone that is one of the most active strike-slip fault systems of the world. The site was found to have liquefaction potential as a result of the analyses taking into account seismicity of the region and soil conditions. The investigation site is located in the industrial installations, Tekkeköy district of Samsun province and 8 new fuel tanks will be built in the area. Accordingly, as a result of the drilling works performed on the ground for site investigation, the filling layer between 0,9-1,2 m up the ground surface, the medium-tight and medium sand between 6-8 m after filling layer and then at the bottom, following this, medium tight-dense fine-medium sand layers have been encountered. In the Standard Penetration Tests made in this layer, values within N30=11-Refusal (>50) were obtained. It has been determined that the underground water level varies between 1.4-4 m according to the data obtained from the inspection well. In addition, the natural unit weight of the soil was determined as approximately 18 kN/m3 and the internal friction angle as (φ), 30o. The soil is composed of alluviums and layers of medium dense sand of the Holocene age originating from the sea. When all these conditions are evaluated, detailed risk analyses have been deemed necessary, since they indicate a risk of liquefaction. Liquefaction risk analyses were performed according to Seed and Idriss (1971) method for four scenarios of earthquakes with 6.0, 6.5, 7.0 and 7.2 magnitudes. As a result of the analyses made, it has been deemed necessary to improve the soil in order to prevent or reduce the liquefaction effects which may occur in a possible earthquake due to the presence of liquefaction potential in the research area. For this purpose, jet grouting method and geogrid fill system, which are used widely in Turkey, have been chosen as appropriate improvement methods. Geogrids are strong in tension so they are commonly used to reinforce subsoils below foundations. Additionally, jet grouting method provides high bearing capacity; it is solution to the settlement problems, it can be applied to almost any kind of soil and it has a short production period. Within this scope, optimal solution was obtained with 616 pieces of 8 m and 12 m jet grout columns with the diameter of 0.65 m and with geogrid mechanical fillings laid on jet grout columns. Thus, not only the risk of liquefaction was eliminated but also an improvement of more than 3 times of the bearing capacity of the foundation was acquired. In addition, the required quality control tests were carried out for the jet grout columns built in the research area and no adverse effects were observed. Key words: Liquefaction, soil improvement, jet grouting, geogrid

  10. PREPARATION OF U-PLANT FOR FINAL DEMOLITION AND DISPOSAL - 12109E

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    FARABEE OA; HERZOG B; CAMERON C

    2012-02-16

    The U-Plant is one of the five major nuclear materials processing facilities at Hanford and was chosen as a pilot project to develop the modalities for closure of the other four facilities at Hanford and the rest of the Department of Energy (DOE) complex. The remedy for this facility was determined by a Record of Decision (ROD) pursuant to the Comprehensive Environmental Response, Compensation and Liability Act of 1980 (CERCLA). That remedy was to 'Close in Place - Partially Demolished Structure'. The U-Plant facility is identified as the 221-U Building and is a large, concrete structure nominally 247m (810 ft)more » long, 20 M (66 ft) wide and 24 m (77 ft) high with approximately 9 m (30 ft) being below grade level. It is a robust facility with walls ranging from 0.9 m to 2.7 m (3 ft to 9 ft) thick. One large room extends the entire length of the building that provides access to 40 sub-grade processing cells containing tanks, piping and other components. The work breakdown was divided into three major deliverables: (1) Tank D-10 Removal: removal of Tank D-10, which contained TRU waste; (2) Equipment Disposition: placement of contaminated equipment in the sub-grade cells; and (3) Canyon Grouting: grouting canyon void spaces to the maximum extent practical. A large number of pieces of contaminated equipment (pumps, piping, centrifuges, tanks, etc) from other facilities that had been stored on the canyon operating floor were placed inside of the sub-grade cells as final disposition, grouted and the cell shield plug reinstalled. This action precluded a large volume of waste being transported to another burial site. Finally, {approx}19,000 m3 ({approx}25,000 yd3) of grout was placed inside of the cells (in and around the contaminated equipment), in the major galleries. the ventilation tunnel, the external ventilation duct, and the hot pipe trench to minimize the potential for void spaces and to reduce the mobility, solubility, and/or toxicity of the grouted waste. The interim condition of the facility is 'cold and dark'. Upon availability of funding the structure will have contamination fixative applied to all contaminated surfaces and may be explosively demolished, with the remaining structure buried under an engineered barrier.« less

  11. Microbially Induced Carbonate Precipitation: a Novel Grout for Permeability Control in Subsurface Engineering Works

    NASA Astrophysics Data System (ADS)

    Minto, J. M.; Hingerl, F.; Lunn, R. J.; Benson, S. M.

    2016-12-01

    ContextWe utilise the urea hydrolysing capability of soil bacteria Sporosarcina pasteurii to precipitate CaCO3 in a process termed Microbially Induced Carbonate Precipitation (MICP). MICP injection fluid properties are low particle size and low viscosity giving excellent grout penetrability. The CaCO3 grout has been shown to be effective at reducing permeability in porous and fractured media. MICP has consequently been proposed as an alternative to more traditional cement and chemical grouts, particularly in the fields of radioactive waste disposal and geological sequestration of CO2. This study investigates the role of fluid flow/CaCO3 feedback during precipitation and accelerated dissolution to better understand the longevity of an MICP grout under low pH environmental conditions such as found in a carbon sequestration reservoir. MethodsExperiments were conducted on a single Berea sandstone core in a high pressure core holder to characterise permeability, porosity and multiphase flow behaviour at sequestration reservoir temperature and pressure. Characterisation was carried out before MICP, after MICP, and after accelerated dissolution with hydrochloric acid. At each step the entire core was scanned in a medical x-ray CT scanner to spatially resolve (with a resolution of 0.5x0.5x1mm) the changes in porosity and saturation with CaCO3 precipitation and dissolution. Finally, the dried core was scanned with μ-CT at 30μm (full core) and 10μm (sub-volume) resolutions to investigate structural changes to the Berea at near pore scale. ResultsSix MICP treatment cycles over two days reduced core permeability from 886 mDarcy to 40 mDarcy with a greater reduction in porosity at the inlet. Dissolution with acid restored much of the porosity, but did not restore permeability to the same extent. Preferential flow paths formed during the dissolution step were visible in the first 4mm of the 100mm core, but did not extend further into the core. DiscussionThis study provides evidence that MICP can potentially produce a long lasting seal, even in challenging subsurface environments, provided that a thick enough layer of CaCO3 can be precipitated with a low initial permeability. Challenges remain for ensuring that such a barrier can be created in the subsurface and are the subject of further investigation.

  12. Improved Characterization of Groundwater Flow in Heterogeneous Aquifers Using Granular Polyacrylamide (PAM) Gel as Temporary Grout

    NASA Astrophysics Data System (ADS)

    Klepikova, Maria V.; Roques, Clement; Loew, Simon; Selker, John

    2018-02-01

    The range of options for investigation of hydraulic behavior of aquifers from boreholes has been limited to rigid, cumbersome packers, and inflatable sleeves. Here we show how a new temporary borehole sealing technique using soft grains of polyacrylamide (PAM) gel as a sealing material can be used to investigate natural groundwater flow dynamics and discuss other possible applications of the technology. If no compressive stress is applied, the gel packing, with a permeability similar to open gravel, suppresses free convection, allowing for local temperature measurements and chemical sampling through free-flowing gel packing. Active heating laboratory and field experiments combined with temperature measurements along fiber optic cables were conducted in water-filled boreholes and boreholes filled with soft grains of polyacrylamide gel. The gel packing is shown to minimize the effect of free convection within the well column and enable detection of thin zones of relatively high or low velocity in a highly transmissive alluvial aquifer, thus providing a significant improvement compared to temperature measurements in open boreholes. Laboratory experiments demonstrate that under modest compressive stress to the gel media the permeability transitions from highly permeable to nearly impermeable grouting. Under this configuration the gel packing could potentially allow for monitoring local response pressure from the formation with all other locations in the borehole hydraulically isolated.

  13. Decommissioning the Fuel Process Building, a Shift in Paradigm for Terminating Safeguards on Process Holdup

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ivan R. Thomas

    INMM Abstract 51st Annual Meeting Decommissioning the Fuel Process Building, a Shift in Paradigm for Terminating Safeguards on Process Holdup The Fuel Process Building at the Idaho Nuclear Technology and Engineering Center (INTEC) is being decommissioned after nearly four decades of recovering high enriched uranium from various government owned spent nuclear fuels. The separations process began with fuel dissolution in one of multiple head-ends, followed by three cycles of uranium solvent extraction, and ending with denitration of uranyl nitrate product. The entire process was very complex, and the associated equipment formed an extensive maze of vessels, pumps, piping, and instrumentationmore » within several layers of operating corridors and process cells. Despite formal flushing and cleanout procedures, an accurate accounting for the residual uranium held up in process equipment over extended years of operation, presented a daunting safeguards challenge. Upon cessation of domestic reprocessing, the holdup remained inaccessible and was exempt from measurement during ensuing physical inventories. In decommissioning the Fuel Process Building, the Idaho Cleanup Project, which operates the INTEC, deviated from the established requirements that all nuclear material holdup be measured and credited to the accountability books and that all nuclear materials, except attractiveness level E residual holdup, be transferred to another facility. Instead, the decommissioning involved grouting the process equipment in place, rather than measuring and removing the contained holdup for subsequent transfer. The grouting made the potentially attractiveness level C and D holdup even more inaccessible, thereby effectually converting the holdup to attractiveness level E and allowing for termination of safeguards controls. Prior to grouting the facility, the residual holdup was estimated by limited sampling and destructive analysis of solutions in process lines and by acceptable knowledge based upon the separations process, plant layout, and operating history. The use of engineering estimates, in lieu of approved measurement methods, was justified by the estimated small quantity of holdup remaining, the infeasibility of measuring the holdup in a highly radioactive background, and the perceived hazards to personnel. The alternate approach to quantifying and terminating safeguards on process holdup was approved by deviation.« less

  14. Lithologic, natural-gamma, grain-size, and well-construction data for Wright-Patterson Air Force Base, Ohio

    USGS Publications Warehouse

    Dumouchelle, D.H.; De Roche, Jeffrey T.

    1991-01-01

    Wright-Patterson Air Force Base, in southwestern Ohio, overlies a buried-valley aquifer. The U.S. Geological Survey installed 35 observation wells at 13 sites on the base from fall 1988 through spring 1990. Fourteen of the wells were completed in bedrock; the remaining wells were completed in unconsolidated sediments. Split-spoon and bedrock cores were collected from all of the bedrock wells. Shelby-tube samples were collected from four wells. The wells were drilled by either the cable-tool or rotary method. Data presented in this report include lithologic and natural-gamma logs, and, for selected sediment samples, grain-size distributions of permeability. Final well-construction details, such as the total depth of well, screened interval, and grouting details, also are presented.

  15. DSC and curing kinetics study of epoxy grouting diluted with furfural -acetone slurry

    NASA Astrophysics Data System (ADS)

    Yin, H.; Sun, D. W.; Li, B.; Liu, Y. T.; Ran, Q. P.; Liu, J. P.

    2016-07-01

    The use of furfural-acetone slurry as active diluents of Bisphenol-A epoxy resin (DGEBA) groutings has been studied by dynamic and non-isothermal DSC for the first time. Curing kinetics study was investigated by non-isothermal differential scanning calorimetries at different heating rates. Activation enery (Ea) was calculated based on Kissinger and Ozawa Methods, and the results showed that Ea increased from 58.87 to 71.13KJ/mol after the diluents were added. The furfural-acetone epoxy matrix could cure completely at the theoretical curing temperature of 365.8K and the curing time of 139mins, which were determined by the kinetic model parameters.

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carter, E.

    A new class of grout material based on molten wax offers a dramatic improvement in permeation grouting performance. This new material makes a perfect in situ containment of buried radioactive waste both feasible and cost effective. This paper describes various ways the material can be used to isolate buried waste in situ. Potential applications described in the paper include buried radioactive waste in deep trenches, deep shafts, Infiltration trenches, and large buried objects. Use of molten wax for retrieval of waste is also discussed. Wax can also be used for retrieval of air sensitive materials or drummed waste. This papermore » provides an analysis of the methods of application and the expected performance and cost of several potential projects. (authors)« less

  17. Contaminant Leach Testing of Hanford Tank 241-C-104 Residual Waste

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cantrell, Kirk J.; Snyder, Michelle M.V.; Wang, Guohui

    2015-07-01

    Leach testing of Tank C-104 residual waste was completed using batch and column experiments. Tank C-104 residual waste contains exceptionally high concentrations of uranium (i.e., as high as 115 mg/g or 11.5 wt.%). This study was conducted to provide data to develop contaminant release models for Tank C-104 residual waste and Tank C-104 residual waste that has been treated with lime to transform uranium in the waste to a highly insoluble calcium uranate (CaUO4) or similar phase. Three column leaching cases were investigated. In the first case, C-104 residual waste was leached with deionized water. In the second case, crushedmore » grout was added to the column so that deionized water contacted the grout prior to contacting the waste. In the third case, lime was mixed in with the grout. Results of the column experiments demonstrate that addition of lime dramatically reduces the leachability of uranium from Tank C-104 residual waste. Initial indications suggest that CaUO4 or a similar highly insoluble calcium rich uranium phase forms as a result of the lime addition. Additional work is needed to definitively identify the uranium phases that occur in the as received waste and the waste after the lime treatment.« less

  18. An alternative soil nailing system for slope stabilization: Akarpiles

    NASA Astrophysics Data System (ADS)

    Lim, Chun-Lan; Chan, Chee-Ming

    2017-11-01

    This research proposes an innovative solution for slope stabilization with less environmental footprint: AKARPILES. In Malaysia, landslide has become common civil and environmental problems that cause impacts to the economy, safety and environment. Therefore, effective slope stabilization method helps to improve the safety of public and protect the environment. This study focused on stabilizing surfacial slope failure. The idea of AKARPILES was generated from the tree roots system in slope stabilization. After the piles are installed in the slope and intercepting the slip plane, grout was pumped in and discharged through holes on the piles. The grout then filled the pores in the soil with random flow within the slip zone. SKW mixture was used to simulate the soil slope. There were two designs being proposed in this study and the prototypes were produced by a 3D printer. Trial mix of the grout was carried out to obtain the optimum mixing ratio of bentonite: cement: water. A series of tests were conducted on the single-pile-reinforced slope under vertical slope crest loading condition considering different slope gradients and nail designs. Parameters such as ultimate load, failure time and failure strain were recorded and compared. As comparison with the unreinforced slope, both designs of AKARPILES showed better but different performances in the model tests.

  19. Alternatives to lifting concrete masonry blocks onto rebar: biomechanical and perceptual evaluations.

    PubMed

    Hess, J A; Mizner, R L; Kincl, L; Anton, D

    2012-01-01

    This study examined the use of and barriers to H-block and high lift grouting, two alternatives to lifting concrete masonry blocks onto vertical rebar. Peak and cumulative shoulder motions were evaluated, as well as adoption barriers: H-block cost and stakeholder perceptions. Results indicated that using the alternatives significantly decreased peak shoulder flexion (p < 0.001). A case study indicated that building cost was higher with H-block, but the difference was less than 2% of the total cost. Contractors and specifiers reported important differences in perceptions, work norms, and material use and practices. For example, 48% of specifiers reported that use of high lift grouting was the contractor's choice, while 28% of contractors thought it must be specified. Use of H-block or high-lift grouting should be considered as methods to reduce awkward upper extremity postures. Cost and stakeholders' other perceptions present barriers that are important considerations when developing diffusion strategies for these alternatives. This study provides information from several perspectives about ergonomic controls for a high risk bricklaying task, which will benefit occupational safety experts, health professionals and ergonomists. It adds to the understanding of shoulder stresses, material cost and stakeholder perceptions that will contribute to developing effective diffusion strategies.

  20. Preliminary In-Situ Evaluation of an Innovative, Semi-Flexible Pavement Wearing Course Mixture Using Fast Falling Weight Deflectometer

    PubMed Central

    Pratelli, Chiara; Betti, Giacomo; Marradi, Alessandro

    2018-01-01

    In the last forty, years semi-flexible pavements have been successfully employed, especially in those areas subjected to heavy and slow-moving loads. They usually comprise a wearing course of Grouted Macadam, a composite pavement material that provides significant advantages in comparison to both concrete and asphalt pavements. On the other hand, the laying process of this material is a two-stage operation, and the realization complexity leads to long realization times and high initial costs. Therefore, the use of semi-flexible pavements has been limited to some fields of application and areas. Recently, an innovative material has been developed to be used as an alternative to Grouted Macadam for semi-flexible pavement wearing course realization. This material should provide similar or even superior characteristics compared to traditional Grouted Macadam. This will reduce semi-flexible pavement construction time and avoid the need for dividing the laying process. This paper presents an experimental program involving the use of FastFWD, as an APT device, to evaluate in-situ properties and performance of this material. The achieved results regarding the validation of this new material by means of FastFWD appear promising both in terms of the material’s properties and resistance to dynamic load repetitions. PMID:29659543

  1. Special Analysis: Disposal of ETF Activated Carbon Vessels in Slit Trenches at the E-Area Low-Level Waste Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Collard, L.B.

    2003-08-25

    This Special Analysis (SA) addresses two contaminants of concern, H-3 and I-129, in three Effluent Treatment Facility (ETF) Activated Carbon Vessels awaiting disposal as solid waste. The Unreviewed Disposal Question (UDQ) evaluation listed two options for disposal of this waste, disposal as Components-in-Grout (CIG) or disposal in Slit Trenches with sealed openings to restrict release of H-3 form the vessels. Consumption of the CIG inventory limit and consumption of CIG facility volume are shown for the ETF vessels to allow easy comparison with the consumption of Slit Trench inventory limit and consumption of the Slit Trench facility volume . Themore » inventory projections are based on doubling the inventory of the three ETF vessels in the E-Area to account for the unknown inventory of three ETF vessels in the ETF. When the grout ultimately is assumed to degrade hydraulically, the water movement is not impeded as much as the release is accelerated by the presence of the grout. Under these conditions for the CIG trenches relative to the Slit Trenches, the well concentrations are higher, the inventory limit is lower and for a given inventory the inventory limit consumption is higher.« less

  2. Preliminary In-Situ Evaluation of an Innovative, Semi-Flexible Pavement Wearing Course Mixture Using Fast Falling Weight Deflectometer.

    PubMed

    Pratelli, Chiara; Betti, Giacomo; Giuffrè, Tullio; Marradi, Alessandro

    2018-04-16

    In the last forty, years semi-flexible pavements have been successfully employed, especially in those areas subjected to heavy and slow-moving loads. They usually comprise a wearing course of Grouted Macadam, a composite pavement material that provides significant advantages in comparison to both concrete and asphalt pavements. On the other hand, the laying process of this material is a two-stage operation, and the realization complexity leads to long realization times and high initial costs. Therefore, the use of semi-flexible pavements has been limited to some fields of application and areas. Recently, an innovative material has been developed to be used as an alternative to Grouted Macadam for semi-flexible pavement wearing course realization. This material should provide similar or even superior characteristics compared to traditional Grouted Macadam. This will reduce semi-flexible pavement construction time and avoid the need for dividing the laying process. This paper presents an experimental program involving the use of FastFWD, as an APT device, to evaluate in-situ properties and performance of this material. The achieved results regarding the validation of this new material by means of FastFWD appear promising both in terms of the material's properties and resistance to dynamic load repetitions.

  3. GROUT HOPPER MODELING STUDY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, S.

    2011-08-30

    The Saltstone facility has a grout hopper tank to provide agitator stirring of the Saltstone feed materials. The tank has about 300 gallon capacity to provide a larger working volume for the grout slurry to be held in case of a process upset, and it is equipped with a mechanical agitator, which is intended to keep the grout in motion and agitated so that it won't start to set up. The dry feeds and the salt solution are already mixed in the mixer prior to being transferred to the hopper tank. The hopper modeling study through this work will focusmore » on fluid stirring and agitation, instead of traditional mixing in the literature, in order to keep the tank contents in motion during their residence time so that they will not be upset or solidified prior to transferring the grout to the Saltstone disposal facility. The primary objective of the work is to evaluate the flow performance for mechanical agitators to prevent vortex pull-through for an adequate stirring of the feed materials and to estimate an agitator speed which provides acceptable flow performance with a 45{sup o} pitched four-blade agitator. In addition, the power consumption required for the agitator operation was estimated. The modeling calculations were performed by taking two steps of the Computational Fluid Dynamics (CFD) modeling approach. As a first step, a simple single-stage agitator model with 45{sup o} pitched propeller blades was developed for the initial scoping analysis of the flow pattern behaviors for a range of different operating conditions. Based on the initial phase-1 results, the phase-2 model with a two-stage agitator was developed for the final performance evaluations. A series of sensitivity calculations for different designs of agitators and operating conditions have been performed to investigate the impact of key parameters on the grout hydraulic performance in a 300-gallon hopper tank. For the analysis, viscous shear was modeled by using the Bingham plastic approximation. Steady state analyses with a two-equation turbulence model were performed with the FLUENT{trademark} codes. All analyses were based on three-dimensional results. Recommended operational guidance was developed by using the basic concept that local shear rate profiles and flow patterns can be used as a measure of hydraulic performance and spatial stirring. Flow patterns were estimated by a Lagrangian integration technique along the flow paths from the material feed inlet. The modeling results show that when the two-stage agitator consisting of a 45{sup o} pitched propeller and radial flat-plate blades is run at 140 rpm speed with 28 in diameter, the agitator provides an adequate stirring of the feed materials for a wide range of yield stresses (1 to 21 Pa) and the vortex system is shed into the remote region of the tank boundary by the blade passage in an efficient way. The results of this modeling study were used to develop the design guidelines for the agitator stirring and dispersion of the Saltstone feed materials in a hopper tank.« less

  4. Technology Evaluation Report: Non-destructive ...

    EPA Pesticide Factsheets

    Technology Evaluation Report HSRP is working to develop tools and information that will help detect the intentional introduction of chemical or biological contaminants in buildings or water systems, the containment of these contaminants, the decontamination of buildings and/or water systems, and the management of wastes generated from decontamination and cleanup operations. Evaluation of the performance of CBI Polymers’ DeconGelTM 1108, Environmental Alternatives, Inc.’s (EAI’s) Rad-Release II (RRII), Environmental Alternatives, Inc.’s SuperGel, and Intek Technologies’ LH-21. The objective of evaluating these technologies was to test their ability to remove radioactive cesium (Cs)-137 from the mixed building material coupons of brick with mortar, tile with grout, granite with mortar, all mortar and all grout coupons.

  5. The Behaviour of Palm Oil Fibre Block Masonry Prism under Eccentric Compressive Loading

    NASA Astrophysics Data System (ADS)

    Mokhtar, Mardiha; Kolop, Roslan; Baizura Hamid, Nor; Kaamin, Masiri; Farhan Rosdi, Mohd; Ngadiman, Norhayati; Sahat, Suhaila

    2017-08-01

    Dry-stacked masonry offers great benefits in constructing masonry buildings. Several examples from previous research show that dry masonry is reasonable alternative to the traditional building system. By addition of fibre, the ductility and the propagation of cracking will be improved. This study investigates the dry stack oil palm fibre block prisms which were subjected to eccentricity compression loads. These concrete blocks were cast using a single mould with suitable fibre-cement composition namely 1:4 (cement: sand) and 0.40 water to the cement ratio based on cement weight. Prisms test using 400 (length) × 150 (width) × 510 (height) mm specimen was carried under eccentric load. There were forty eight (48) prisms built with different configurations based on their volume of fibre. In this study, one types of grout were used namely the fine grout of mix 1:3:2 (cement: sand: aggregate (5mm maximum). Based on the test performed, the failure mechanism and influencing parameters were discussed. From compressive strength test result, it shows that the strength of concrete block decreased with the increase of fibre used. Although the control sample has the higher strength compared to concrete with EFB, it can be seen from mode failure of masonry prism that fibre could extend the cracking time. These results show that the oil palm fibre blocks can improve the failure behaviour and suitable to be used as load bearing wall construction in Malaysia.

  6. See Also:Mechanics of Cohesive-frictional MaterialsCopyright © 2004 John Wiley & Sons, Ltd.Get Sample Copy

  7. Recommend to Your Librarian
  8. E-MailPrint
  1. Permanent Ground Anchors : Nicholson Design Criteria

    DOT National Transportation Integrated Search

    1982-09-01

    This study discusses the methods used by Nicholson Construction Company in the design of permanent ground anchors specifically as related to retaining walls. Basic soil parameters, design concepts, drilling and grouting methods for ground anchors are...

  2. Corrosion of post-tensioned tendons with deficient grout : [summary].

    DOT National Transportation Integrated Search

    2016-10-01

    Stressed steel cables greatly increase the strength and capability of concrete structural : components, providing tensile strength that concrete alone does not possess. The cables : called tendons run through sealed tubes in the concrete whic...

  3. Material Characterization of Field-Cast Connection Grouts : TechBrief

    DOT National Transportation Integrated Search

    2013-01-01

    There is a growing need for durable and resilient highway bridge construction/reconstruction systems that facilitate rapid completion of onsite activities, thus minimizing intrusion on the traveling public. Modular components can provide highquality,...

  4. Injected polyurethane slab jacking : interim report

    DOT National Transportation Integrated Search

    2000-09-01

    Conventional methods for raising in-place concrete slabs to align roadway sections or to counteract subsidence requires pressure-injecting grout under the slab. As other transportation organizations have had success with the URETEK Method, which util...

  5. Corrosion characteristics of post-tensioning strands in ungrouted ducts : summary.

    DOT National Transportation Integrated Search

    2011-01-01

    To prevent corrosion of post-tensioning strands, FDOT construction specifications currently require post-tensioning ducts to be grouted within seven calendar days of strand installation. This period challenges construction schedules on large projects...

  6. Injected polyurethane slab jacking : final report.

    DOT National Transportation Integrated Search

    2002-06-01

    Conventional methods for raising in-place concrete slabs to align roadway sections or to counteract subsidence requires pressure-injecting grout under the slab. As other transportation organizations have had success with the URETEK Method, which util...

  7. DATA QUALITY OBJECTIVE SUMMARY REPORT FOR THE 105 K EAST ION EXCHANGE COLUMN MONOLITH

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    JOCHEN, R.M.

    2007-08-02

    The 105-K East (KE) Basin Ion Exchange Column (IXC) cells, lead caves, and the surrounding vault are to be removed as necessary components in implementing ''Hanford Federal Facility Agreement and Consent Order'' (Ecology et al. 2003) milestone M-034-32 (Complete Removal of the K East Basin Structure). The IXCs consist of six units located in the KE Basin, three in operating positions in cells and three stored in a lead cave. Methods to remove the IXCs from the KE Basin were evaluated in KBC-28343, ''Disposal of K East Basin Ion Exchange Column Evaluation''. The method selected for removal was grouting themore » six IXCs into a single monolith for disposal at the Environmental Restoration Disposal Facility (ERDF). Grout will be added to the IXC cells, IXC lead caves containing spent IXCs, and in the spaces between the lead cave walls and metal skin, to immobilize the contaminants, provide self-shielding, minimize void space, and provide a structurally stable waste form. The waste to be offered for disposal is the encapsulated monolith defined by the exterior surfaces of the vault and the lower surface of the underlying slab. This document presents summary of the data quality objective (DQO) process establishing the decisions and data required to support decision-making activities for the disposition of the IXC monolith. The DQO process is completed in accordance with the seven-step planning process described in EPA QA/G-4, ''Guidance for the Data Quality Objectives Process'', which is used to clarify and study objectives; define the appropriate type, quantity, and quality of data; and support defensible decision-making. The DQO process involves the following steps: (1) state the problem; (2) identify the decision; (3) identify the inputs to the decision; (4) define the boundaries of the study; (5) develop a decision rule (DR); (6) specify tolerable limits on decision errors; and (7) optimize the design for obtaining data.« less

  8. SEMINAR PROCEEDINGS: RCRA CORRECTIVE ACTION STABILIZATION TECHNOLOGIES

    EPA Science Inventory

    The seminar publication provides an overview of many technologies that can be used in applying the stabilization concept to RCRA cleanup activities. Technologies discussed include covers, grouting, slurry walls, hydrofracture, horizontal well drilling, a vacuum extraction, and b...

  9. Application of Hydrophilic Silanol-Based Chemical Grout for Strengthening Damaged Reinforced Concrete Flexural Members

    PubMed Central

    Ju, Hyunjin; Lee, Deuck Hang; Cho, Hae-Chang; Kim, Kang Su; Yoon, Seyoon; Seo, Soo-Yeon

    2014-01-01

    In this study, hydrophilic chemical grout using silanol (HCGS) was adopted to overcome the performance limitations of epoxy materials used for strengthening existing buildings and civil engineering structures. The enhanced material performances of HCGS were introduced, and applied to the section enlargement method, which is one of the typical structural strengthening methods used in practice. To evaluate the excellent structural strengthening performance of the HCGS, structural tests were conducted on reinforced concrete beams, and analyses on the flexural behaviors of test specimens were performed by modified partial interaction theory (PIT). In particular, to improve the constructability of the section enlargement method, an advanced strengthening method was proposed, in which the precast panel was directly attached to the bottom of the damaged structural member by HCGS, and the degree of connection of the test specimens, strengthened by the section enlargement method, were quantitatively evaluated by PIT-based analysis. PMID:28788708

  10. Application of Hydrophilic Silanol-Based Chemical Grout for Strengthening Damaged Reinforced Concrete Flexural Members.

    PubMed

    Ju, Hyunjin; Lee, Deuck Hang; Cho, Hae-Chang; Kim, Kang Su; Yoon, Seyoon; Seo, Soo-Yeon

    2014-06-23

    In this study, hydrophilic chemical grout using silanol (HCGS) was adopted to overcome the performance limitations of epoxy materials used for strengthening existing buildings and civil engineering structures. The enhanced material performances of HCGS were introduced, and applied to the section enlargement method, which is one of the typical structural strengthening methods used in practice. To evaluate the excellent structural strengthening performance of the HCGS, structural tests were conducted on reinforced concrete beams, and analyses on the flexural behaviors of test specimens were performed by modified partial interaction theory (PIT). In particular, to improve the constructability of the section enlargement method, an advanced strengthening method was proposed, in which the precast panel was directly attached to the bottom of the damaged structural member by HCGS, and the degree of connection of the test specimens, strengthened by the section enlargement method, were quantitatively evaluated by PIT-based analysis.

  11. Results Of Insulation Resistance Between Solar Cell String Gaps Without RTV Adhesive Grout After Electrostatic Discharge Tests With Cover Glass Flashover

    NASA Astrophysics Data System (ADS)

    Hoang, Bao; Wong, Frankie; Redick, Tod; Masui, Hirokazu; Endo, Taishi; Toyoda, Kazuhiro; Cho, Mengu

    2011-10-01

    A series of electrostatic discharge (ESD) tests was performed on solar array test coupons consisting of Advanced Triple Junction InGaP2/InGaAs/Ge solar cells. The motivation for these tests was to evaluate the effects of ESD on solar array design without room temperature vulcanized (RTV) adhesive grout between the string-to-string parallel gaps. To investigate the threshold of permanently sustained secondary arcs, various combinations of gap width, load voltage and string current were tested in a vacuum chamber equipped with an electron beam gun. This ESD test program included the ESD test circuit with simulated panel coverglass flashover. Although ESD events did not result in permanent sustained arcs, the insulation resistance between strings was found to decrease as the number of secondary arcs accumulated in the gap.

  12. Simulation and analysis on ultrasonic testing for the cement grouting defects of the corrugated pipe

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Qingbang, Han; Ling, Chen; Changping, Zhu

    2014-02-18

    The defects exist in the cement grouting process of prestressed corrugated pipe may directly impair the bridge safety. In this paper, sound fields propagation in concrete structures with corrugated pipes and the influence of various different defects are simulated and analyzed using finite element method. The simulation results demonstrate a much complex propagation characteristic due to multiple reflection, refraction and scattering, where the scattering signals caused by metal are very strong, while the signals scattered by an air bubble are weaker. The influence of defect both in time and frequency domain are found through deconvolution treatment. In the time domain,more » the deconvolution signals correspond to larger defect display a larger head wave amplitude and shorter arrive time than those of smaller defects; in the frequency domain, larger defect also shows a stronger amplitude, lower center frequency and lower cutoff frequency.« less

  13. Effluent Management Facility Evaporator Bottom-Waste Streams Formulation and Waste Form Qualification Testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Saslow, Sarah A.; Um, Wooyong; Russell, Renee L.

    This report describes the results from grout formulation and cementitious waste form qualification testing performed by Pacific Northwest National Laboratory (PNNL) for Washington River Protection Solutions, LLC (WRPS). These results are part of a screening test that investigates three grout formulations proposed for wide-range treatment of different waste stream compositions expected for the Hanford Effluent Management Facility (EMF) evaporator bottom waste. This work supports the technical development need for alternative disposition paths for the EMF evaporator bottom wastes and future direct feed low-activity waste (DFLAW) operations at the Hanford Site. High-priority activities included simulant production, grout formulation, and cementitious wastemore » form qualification testing. The work contained within this report relates to waste form development and testing, and does not directly support the 2017 Integrated Disposal Facility (IDF) performance assessment (PA). However, this work contains valuable information for use in PA maintenance past FY 2017 and future waste form development efforts. The provided results and data should be used by (1) cementitious waste form scientists to further the understanding of cementitious leach behavior of contaminants of concern (COCs), (2) decision makers interested in off-site waste form disposal, and (3) the U.S. Department of Energy, their Hanford Site contractors and stakeholders as they assess the IDF PA program at the Hanford Site. The results reported help fill existing data gaps, support final selection of a cementitious waste form for the EMF evaporator bottom waste, and improve the technical defensibility of long-term waste form risk estimates.« less

  14. Development of High Performance Grouts for Bonded Post-tensioned Structures

    DOT National Transportation Integrated Search

    1999-10-01

    The use of post-tensioning in bridges can provide durability and structural benefits to the system while expediting the construction process. When post-tensioning is combined with precast elements, traffic interference can be greatly reduced through ...

  15. Long-term post-tensioned beam exposure test specimens : final evaluation.

    DOT National Transportation Integrated Search

    2003-08-01

    In the last few years, the effectiveness of cement grout in galvanized or polyethylene ducts, the most widely used corrosion protection system for : multistrand bonded post-tensioned concrete tendons, has been under debate, due to significant tendon ...

  16. Post-Tensioning Duct Air Pressure Testing Effects on Web Cracking

    DOT National Transportation Integrated Search

    2015-01-01

    Nevada Department of Transportation (NDOT) post-tensioned concrete bridges have experienced web cracking near the post-tensioning ducts during the construction process. The ducts were air pressure tested to ensure the duct can successfully be grouted...

  17. PERMEABLE REACTIVE BARRIER TECHNOLOGIES FOR CONTAMINANT REMEDIATION

    EPA Science Inventory

    Environmental scientists are generally familiar with the concept of barriers for restricting the movement of contaminant plumes in ground water. Such barriers are typically constructed of highly impermeable emplacements of materials such as grouts, slurries, or sheet pilings to ...

  18. Field testing of jet-grouted pile : [summary].

    DOT National Transportation Integrated Search

    2014-01-01

    In many areas of Florida, local geology dictates the use of deep foundations for transportation structures bridges, noise walls, signage, etc. When concrete piles are used, they are either prestressed at the casting yard, cast in situ through a h...

  19. Seismic retrofit of spliced sleeve connections for precast bridge piers.

    DOT National Transportation Integrated Search

    2017-03-01

    Grouted Splice Sleeve (GSS) connectors are being considered for connecting bridge columns, footings, and pier caps in Accelerated Bridge Construction (ABC). A repair technique for precast reinforced concrete bridge column-to-footing and column-to-pie...

  20. Simulation of prepackaged grout bleed under field conditions : [summary].

    DOT National Transportation Integrated Search

    2014-04-01

    Post-tensioning (PT) is a method of compensating : for concretes weakness under tension by adding : steel. Tubes (ducts) are cast into concrete : components; after the concrete sets, high-strength steel cables (tendons or strand) are run : through...

  1. PIMS:Remediation of Soil and Groundwater Contaminated With Metals

    DTIC Science & Technology

    2006-06-01

    24 4.4.1.1 Bioremediation/ Phytoremediation ...........................................24 4.4.1.2 Physical...ii 5.3.2 Grouting and Off-Site Disposal .................................................................31 5.3.3 Phytoremediation ...Above Background in Sieved Soil ...................................... 12 Table 3. Leachate Monitoring Results

  2. Non-Newtonian fluid flow in 2D fracture networks

    NASA Astrophysics Data System (ADS)

    Zou, L.; Håkansson, U.; Cvetkovic, V.

    2017-12-01

    Modeling of non-Newtonian fluid (e.g., drilling fluids and cement grouts) flow in fractured rocks is of interest in many geophysical and industrial practices, such as drilling operations, enhanced oil recovery and rock grouting. In fractured rock masses, the flow paths are dominated by fractures, which are often represented as discrete fracture networks (DFN). In the literature, many studies have been devoted to Newtonian fluid (e.g., groundwater) flow in fractured rock using the DFN concept, but few works are dedicated to non-Newtonian fluids.In this study, a generalized flow equation for common non-Newtonian fluids (such as Bingham, power-law and Herschel-Bulkley) in a single fracture is obtained from the analytical solutions for non-Newtonian fluid discharge between smooth parallel plates. Using Monte Carlo sampling based on site characterization data for the distribution of geometrical features (e.g., density, length, aperture and orientations) in crystalline fractured rock, a two dimensional (2D) DFN model is constructed for generic flow simulations. Due to complex properties of non-Newtonian fluids, the relationship between fluid discharge and the pressure gradient is nonlinear. A Galerkin finite element method solver is developed to iteratively solve the obtained nonlinear governing equations for the 2D DFN model. Using DFN realizations, simulation results for different geometrical distributions of the fracture network and different non-Newtonian fluid properties are presented to illustrate the spatial discharge distributions. The impact of geometrical structures and the fluid properties on the non-Newtonian fluid flow in 2D DFN is examined statistically. The results generally show that modeling non-Newtonian fluid flow in fractured rock as a DFN is feasible, and that the discharge distribution may be significantly affected by the geometrical structures as well as by the fluid constitutive properties.

  3. Corrosion resistance of grouted post-tensioning systems : [summary].

    DOT National Transportation Integrated Search

    2013-08-01

    The increased popularity of post-tensioned bridge construction in the United States has led to concerns about corrosion and its impact on the life cycle of these bridges. Although the vast majority of post-tensioned bridges in the United States have ...

  4. Improved connection details for adjacent prestressed bridge beams.

    DOT National Transportation Integrated Search

    2015-03-01

    Bridges with adjacent box beams and voided slabs are simply and rapidly constructed, and are well suited to : short to medium spans. The traditional connection between the adjacent members is a shear key lled with a : conventional non-shrink grout...

  5. Evaluating prestressing strands and post-tensioning cables in concrete structures using nondestructive methods.

    DOT National Transportation Integrated Search

    2015-11-01

    The objectives were to evaluate the ability of different NDE methods to detect and quantify : defects associated with corrosion of steel reinforcement and grout defects in post-tensioning : applications; and to evaluate the effectiveness of selected ...

  6. ECONOMICS OF GROUND FREEZING FOR MANAGEMENT OF UNCONTROLLED HAZARDOUS WASTE SITES

    EPA Science Inventory

    Ground freezing for hazardous waste containment is an alternative to the traditional and expensive slurry wall or grout curtain barrier technologies. The parameters quantified in this analysis of it include thermal properties, refrigeration line spacing, equipment mobilization an...

  7. Laboratory investigation of grouted coupler connection details for ABC bridge projects : [tech transfer summary].

    DOT National Transportation Integrated Search

    2015-08-01

    Advancements and increased use of accelerated bridge construction (ABC) : often result in the use of newly developed, or modified, technologies and/or : construction techniques that are sometimes untested in this new application. : For designers and ...

  8. 75 FR 62893 - Draft Regulatory Guide: Issuance, Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-13

    ... for using portland cement grout to protect prestressing steel from corrosion. The prestressing tendon system of a prestressed concrete containment structure is a principal strength element of the structure... of the structure depends on the functional reliability of the structure's principal strength elements...

  9. Rheology limits for grout materials used for precast bent cap pile pockets in hot weather.

    DOT National Transportation Integrated Search

    2017-02-28

    While prefabricated bridge elements and systems (PBES) have been used for many years in Florida, The Florida Department : of Transportation (FDOT) is currently developing local specifications for PBES to ad- dress the Federal Highway : Administration...

  10. Staying Afloat.

    ERIC Educational Resources Information Center

    Popke, Michael

    2000-01-01

    Examines the difficulties and solutions to wet environment repairs in pools and locker rooms. Issues include crack and leak repairs, repairs to grout and tile, on-deck accessories, and underwater lights. Several "tricks-of-the-trade" notes are included as is a brief discussion on emergency shutdowns. (GR)

  11. 84. Photographic copy of historic photo, February 17, 1930 (original ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    84. Photographic copy of historic photo, February 17, 1930 (original print filed in Record Group 115, National Archives, Washington, D.C.). OWYHEE DAM-HIGH PRESSURE GROUTING EQUIPMENT, AND 25-TON GASOLINE LOCOMOTIVE. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  12. Concrete Durability: A Multibillion-Dollar Opportunity

    DTIC Science & Technology

    1987-01-01

    Fum -Containing Products 79 MDF Materials 85 Fiber-Reinforced Materials 85 Modified - Sulfur Concretes 87 References 88 APPENDIX: BIOGRAPHICAL SKETCHES...construction. MODIFIED - SULFUR CONCRETES Molten sulfur-sand grouts have been used for many years in the constructLin of acid vats because of their

  13. Laboratory investigation of grouted coupler connection details for ABC bridge projects.

    DOT National Transportation Integrated Search

    2015-08-01

    With an ever increasing desire to utilize accelerated bridge construction (ABC) techniques, it is becoming critical that bridge : designers and contractors have confidence in typical details. The Keg Creek Bridge on US 6 in Iowa was a recent ABC exam...

  14. Identification of techniques to meet pH standard during in-stream construction.

    DOT National Transportation Integrated Search

    2014-03-01

    Many of Marylands tributaries traverse highway infrastructure via culverts that are managed : and maintained by SHA. These culverts are often made of galvanized steel and over time are : subjected to scour. Concrete grout is often used as a repair...

  15. Development of laboratory test methods to replace the simulated high-temperature grout fluidity test : [summary].

    DOT National Transportation Integrated Search

    2014-06-01

    Concretes remarkable role in construction depends on its marriage with reinforcing steel. Concrete is very strong in compression, but weak in tension, so reinforcing steel is added to increase tensile strength, yielding structural components capab...

  16. Effect of voids in grouted, post-tensioned concrete bridge construction : seminar slides.

    DOT National Transportation Integrated Search

    2009-02-26

    Post-tensioned (PT) bridges have several advantages over other bridge types: they can span longer distances, can be constructed relatively fast, and are economical. The tendons of PT bridges are critical components, essentially the backbone of the PT...

  17. Sensor Network Demonstration for In Situ Decommissioning - 13332

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lagos, L.; Varona, J.; Awwad, A.

    2013-07-01

    Florida International University's (FIU's) Applied Research Center is currently supporting the Department of Energy's (DOE) Environmental Management Office of D and D and Facility Engineering program. FIU is supporting DOE's initiative to improve safety, reduce technical risks, and limit uncertainty within D and D operations by identifying technologies suitable to meet specific facility D and D requirements, assessing the readiness of those technologies for field deployment, and conducting feasibility studies and large scale demonstrations of promising technologies. During FY11, FIU collaborated with Savannah River National Laboratory in the development of an experimental test site for the demonstration of multiple sensormore » systems for potential use in the in situ decommissioning process. In situ decommissioning is a process in which the above ground portion of a facility is dismantled and removed, and the underground portion is filled with a cementious material such as grout. In such a scenario, the question remains on how to effectively monitor the structural health of the grout (cracking, flexing, and sinking), as well as track possible migration of contaminants within and out of the grouted monolith. The right types of sensors can aid personnel in better understanding the conditions within the entombed structure. Without sensors embedded in and around the monolith, it will be very difficult to estimate structural integrity and contaminant transport. Yet, to fully utilize the appropriate sensors and the provided data, their performance and reliability must be evaluated outside a laboratory setting. To this end, a large scale experimental setup and demonstration was conducted at FIU. In order to evaluate a large suite of sensor systems, FIU personnel designed and purchased a pre-cast concrete open-top cube, which served as a mock-up of an in situ DOE decommissioned facility. The inside of the cube measures 10 ft x 10 ft x 8 ft. In order to ensure that the individual sensors would be immobilized during the grout pouring activities, a set of nine sensor racks were designed. The 270 sensors provided by Idaho National Laboratory (INL), Mississippi State University (MSU), University of Houston (UH), and University of South Carolina (USC) were secured to these racks based on predetermined locations. Once sensor racks were installed inside the test cube, connected and debugged, approximately 32 cubic yards of special grout material was used to entomb the sensors. MSU provided and demonstrated four types of fiber loop ring-down (FLR) sensors for detection of water, temperature, cracks, and movement of fluids. INL provided and demonstrated time differenced 3D electrical resistivity tomography (ERT), advanced tensiometers for moisture content, and thermocouples for temperature measurements. University of Houston provided smart aggregate (SA) sensors, which detect crack severity and water presence. An additional UH sensor system demonstrated was a Fiber Bragg Grating (FBG) fiber optic system measuring strain, presence of water, and temperature. USC provided a system which measured acoustic emissions during cracking, as well as temperature and pH sensors. All systems were connected to a Sensor Remote Access System (SRAS) data networking and collection system designed, developed and provided by FIU. The purpose of SRAS was to collect and allow download of the raw sensor data from all the sensor system, as well as allow upload of the processed data and any analysis reports and graphs. All this information was made available to the research teams via the Deactivation and Decommissioning Knowledge Management and Information Tool (D and D KM-IT). As a current research effort, FIU is performing an energy analysis, and transferring several sensor systems to a Photovoltaic (PV) System to continuously monitor energy consumption parameters and overall power demands. Also, One final component of this research is focusing on developing an integrated data network to capture, log and analyze sensor system data in near real time from a single interface. FIU personnel and DOE Fellows monitored the progress and condition of the sensors for a period of six months. During this time, the sensors recorded data pertaining to strain, compression, temperature, crack detection, moisture presence, fluid mobility, shock resistance, monolith movement, and electrical resistivity. In addition, FIU regularly observed the curing process of the grout and documented the cube condition via the nine racks of sensors. The sensors held up throughout the curing process, withstood the natural elements for six months, and monitored the integrity of the grout. The large scale experiment and demonstration conducted at FIU was the first of its kind to demonstrate the feasibility of state of the art sensors for in situ decommissioning applications. These efforts successfully measured the durability, performance, and precision of the sensors in question as well as monitored and recorded the curing process of the selected grout material under natural environmental conditions. The current energy analysis work is resulting in data on the constraints placed by some of the sensor systems on a power network that requires high reliability and low losses. In addition, a sensor system demonstration has determined that it is feasible to develop an integrated data network where data can be accessed in near real-time from all systems, thereby allowing for larger-scale integrated system testing to be performed. Information collected during the execution of this research project will aid decision makers in the identification of sensors to be used in nuclear facilities selected for in situ decommissioning. (authors)« less

  18. 76 FR 38213 - Notice of Issuance of Regulatory Guide

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-29

    ... quality standards for using Portland Cement grout to protect prestressing steel from corrosion. The prestressing tendon system of a prestressed concrete containment structure is a principal strength element of... strength elements. Thus, any significant deterioration of the prestressing elements caused by corrosion may...

  19. Corrosion characteristics of unprotected post-tensioning strands under stress : [summary].

    DOT National Transportation Integrated Search

    2014-05-01

    Post tensioned concrete is used in many Florida : transportation structures, many of which are : exposed to fresh or salt water. The steel strands : that supply the tension are encased in a plastic : duct which is later filled with grout, so the stra...

  20. ETV Program Report: Coatings for Wastewater Collection Systems - Epoxy Tec International, Inc., CPP RC3

    EPA Science Inventory

    The Epoxytec, Inc. CPP™ epoxy coating used for wastewater collection system rehabilitation was evaluated by EPA’s Environmental Technology Verification Program under laboratory conditions at the Center for Innovative Grouting Material and Technology (CIGMAT) Laboratory at the Uni...

  1. ETV Program Report: Coatings for Wastewater Collection Systems - Standard Cement Materials, Epoxy Coating 4553

    EPA Science Inventory

    The Standard Cement Materials, Inc. Standard Epoxy Coating 4553™ (SEC 4553) epoxy coating used for wastewater collection system rehabilitation was evaluated by EPA’s Environmental Technology Verification Program under laboratory conditions at the Center for Innovative Grouting Ma...

  2. Identification of techniques to meet pH standard during in-stream construction : research summary.

    DOT National Transportation Integrated Search

    2014-03-01

    Many of Marylands tributaries traverse highway infrastructure via culverts that are managed : and maintained by SHA. These culverts are often made of galvanized steel and over time are : subjected to scour. Concrete grout is often used as a repair...

  3. GROUTING TECHNIQUES IN BOTTOM SEALING OF HAZARDOUS WASTE SITES

    EPA Science Inventory

    Bottom sealing of hazardous waste sites involves the injection or insertion of an inert impermeable and continuous horizontal barrier in soil below the source of contamination. This type of containment strategy could be used in conjunction with other technology such as slurry wal...

  4. Cost Analysis of Remediation Systems for Depleted Uranium

    DTIC Science & Technology

    2014-04-01

    situ stabilization and phytoremediation . In-situ stabilization includes the use of amend- ments, capping, and grouting to immobilize the contaminant in...its current location. Adding amendments to the soil solidifies the DU into insoluble particles. Phytoremediation is the use of plants to help reduce

  5. Bonding agents for portland cement concrete and mortar.

    DOT National Transportation Integrated Search

    1983-01-01

    Structural repairs of bridge piers and abutements require patching concrete : used depends upon the depth of the patch to be made. In some instances, the : use of a liquid bonding agent has been specified in the mixes as well as in a : grout scrubbed...

  6. Shear Performance of Horizontal Joints in Short Precast Concrete Columns with Sleeve Grouted Connections under Cyclic Loading

    PubMed Central

    Liu, Bingyu; Chen, Jiang; Zhang, Yiping

    2016-01-01

    In this study, two short precast concrete columns and two cast-in-situ concrete columns were tested under cyclic loads. It was shown that the sleeve grouted connection was equivalent to the cast-in-situ connections for short columns when the axial compression ratio was 0.6. In order to determine the influence of the axial compression ratio and the shear-span ratio on the shear capacity of the horizontal joint, a FE model was established and verified. The analysis showed that the axial compression ratio is advantageous to the joint and the shear capacity of the horizontal joint increases with increase of the shear-span ratio. Based on the results, the methods used to estimate the shear capacity of horizontal joints in the Chinese Specification and the Japanese Guidelines are discussed and it was found that both overestimated the shear capacity of the horizontal joint. In addition, the Chinese Specification failed to consider the influence of the shear-span ratio. PMID:27861493

  7. Nondestructive spectroscopic characterization of building materials

    NASA Astrophysics Data System (ADS)

    Kassu, Aschalew; Walker, Lauren; Sanders, Rachel; Farley, Carlton; Mills, Jonathan; Sharma, Anup

    2017-04-01

    The purpose of this research project is to demonstrate the application of Raman spectroscopy technique for characterization and identification of the distinct Raman signatures of construction materials. The results reported include the spectroscopic characterization of building materials using compact Raman system with 785 nm wavelength laser. The construction materials studied include polyblend sanded grout, fire barrier sealant, acrylic latex caulk plus and white silicone. It is found that, both fire barrier sealant and acrylic latex caulk plus has a prominent Raman band at 1082 cm-1, and three minor Raman signatures located at 275, 706 and 1436 cm-1. On the other hand, sand grout has three major Raman bands at 1265, 1368 and 1455 cm-1, and four minor peaks at 1573, 1683, 1762, and 1868 cm-1. White silicone, which is a widely used sealant material in construction industry, has two major Raman bands at 482 and 703 cm-1, and minor Raman characteristic bands at 783 and 1409 cm-1.

  8. Soil mixing of stratified contaminated sands.

    PubMed

    Al-Tabba, A; Ayotamuno, M J; Martin, R J

    2000-02-01

    Validation of soil mixing for the treatment of contaminated ground is needed in a wide range of site conditions to widen the application of the technology and to understand the mechanisms involved. Since very limited work has been carried out in heterogeneous ground conditions, this paper investigates the effectiveness of soil mixing in stratified sands using laboratory-scale augers. This enabled a low cost investigation of factors such as grout type and form, auger design, installation procedure, mixing mode, curing period, thickness of soil layers and natural moisture content on the unconfined compressive strength, leachability and leachate pH of the soil-grout mixes. The results showed that the auger design plays a very important part in the mixing process in heterogeneous sands. The variability of the properties measured in the stratified soils and the measurable variations caused by the various factors considered, highlighted the importance of duplicating appropriate in situ conditions, the usefulness of laboratory-scale modelling of in situ conditions and the importance of modelling soil and contaminant heterogeneities at the treatability study stage.

  9. Evaluation of maintenance/rehabilitation alternatives for continuously reinforced concrete pavement

    NASA Astrophysics Data System (ADS)

    Barnett, T. L.; Darter, M. I.; Laybourne, N. R.

    1981-05-01

    The design, construction, performance, and costs of several maintenance and rehabilitation methods were evaluated. Patching, cement grout and asphalt undersealing, epoxying of cracks, and an asphalt overlay were considered. Nondestructive testing, deflections, reflection cracking, cost, and statistical analyses were used to evaluate the methods.

  10. An Eye on Prevention.

    ERIC Educational Resources Information Center

    Kennedy, Mike

    2000-01-01

    Discusses the types of washroom fixtures and locker room equipment that can help minimize and discourage student mischief. Topics include germ control by avoiding the use of tile grout and substituting epoxy paint, using phenolic toilet-stall partitions to reduce vandalism, and using expanded metal lockers to control locker odor. (GR)

  11. ETV Program Report: Coatings for Wastewater Collection Systems - Protective Liner Systems, Inc., Epoxy Mastic, PLS-614

    EPA Science Inventory

    The Protective Liner Systems International, Inc. Epoxy Mastic PLS-614 coating used for wastewater collection system rehabilitation was evaluated by EPA’s Environmental Technology Verification Program under laboratory conditions at the Center for Innovative Grouting Material and T...

  12. Dowel bar retrofit evaluation, district 12, Orange County, Interstate 405

    DOT National Transportation Integrated Search

    2002-09-01

    A dowel bar retrofit project on Interstate 405 near Irvine in Orange County began to exhibit sights of failure in the bond between the existing concrete and the backfill grout in the dowel bar slots. It was requested the Office of Rigid Pavement and ...

  13. Design and performance of self-consolidating concrete for connecting precast concrete deck panels and bridge I-girders.

    DOT National Transportation Integrated Search

    2014-08-01

    Existing full-depth precast concrete deck systems use either open channels or pockets to accommodate the shear connectors of supporting girders for achieving composite systems. The use of open channels or pockets requires cast-in-place concrete/grout...

  14. Effect of voids in grouted, post-tensioned concrete bridge construction : volume 2--inspection, repair, materials, and risks.

    DOT National Transportation Integrated Search

    2009-09-01

    Post-tensioned (PT) bridges are major structures that carry significant traffic. These bridges are designed and : constructed because they are economical for spanning long distances. In Texas, there are several signature PT : bridges. In the late 199...

  15. 97. Photographic copy of historic photo, October 17, 1930 (original ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    97. Photographic copy of historic photo, October 17, 1930 (original print filed in Record Group 115, National Archives, Washington, D.C.). OWYHEE DAM, SHOWING SCHEME OF PANEL POURING, AND ARRANGEMENT OF GROUT AND DRAIN PIPES. - Owyhee Dam, Across Owyhee River, Nyssa, Malheur County, OR

  16. Non-destructive testing of full-length bonded rock bolts based on HHT signal analysis

    NASA Astrophysics Data System (ADS)

    Shi, Z. M.; Liu, L.; Peng, M.; Liu, C. C.; Tao, F. J.; Liu, C. S.

    2018-04-01

    Full-length bonded rock bolts are commonly used in mining, tunneling and slope engineering because of their simple design and resistance to corrosion. However, the length of a rock bolt and grouting quality do not often meet the required design standards in practice because of the concealment and complexity of bolt construction. Non-destructive testing is preferred when testing a rock bolt's quality because of the convenience, low cost and wide detection range. In this paper, a signal analysis method for the non-destructive sound wave testing of full-length bonded rock bolts is presented, which is based on the Hilbert-Huang transform (HHT). First, we introduce the HHT analysis method to calculate the bolt length and identify defect locations based on sound wave reflection test signals, which includes decomposing the test signal via empirical mode decomposition (EMD), selecting the intrinsic mode functions (IMF) using the Pearson Correlation Index (PCI) and calculating the instantaneous phase and frequency via the Hilbert transform (HT). Second, six model tests are conducted using different grouting defects and bolt protruding lengths to verify the effectiveness of the HHT analysis method. Lastly, the influence of the bolt protruding length on the test signal, identification of multiple reflections from defects, bolt end and protruding end, and mode mixing from EMD are discussed. The HHT analysis method can identify the bolt length and grouting defect locations from signals that contain noise at multiple reflected interfaces. The reflection from the long protruding end creates an irregular test signal with many frequency peaks on the spectrum. The reflections from defects barely change the original signal because they are low energy, which cannot be adequately resolved using existing methods. The HHT analysis method can identify reflections from the long protruding end of the bolt and multiple reflections from grouting defects based on mutations in the instantaneous frequency, which makes weak reflections more noticeable. The mode mixing phenomenon is observed in several tests, but this does not markedly affect the identification results due to the simple medium in bolt tests. The mode mixing can be reduced by ensemble EMD (EEMD) or complete ensemble EMD with adaptive noise (CEEMDAN), which are powerful tools to used analyze the test signal in a complex medium and may play an important role in future studies. The HHT bolt signal analysis method is a self-adaptive and automatic process, which can be programed as analysis software and will make bolt tests more convenient in practice.

  17. Effect of voids in grouted post-tensioned concrete bridge construction : inspection and repair manual for external tendons in segmental, post-tensioned bridges.

    DOT National Transportation Integrated Search

    2009-11-01

    Segmental, post-tensioned (PT) bridges are major structures that carry significant traffic. These bridges are designed and constructed because they are economical for spanning long distances. In Texas, there are several signature PT bridges. In the l...

  18. Full-scale Experimental Evaluation of Partially Grouted, Minimally Reinforced Concrete Masonry Unit (CMU) Walls Against Blast Demands

    DTIC Science & Technology

    2010-11-30

    16 Figure 10. Top and Bottom Connections ...Masonry Beams ...............................66 Figure 61. Resistance-displacement Idealization for Reinforced Masonry Beams .......................66...patterns on exterior walls. Masonry can form structural elements (bearing walls, columns , or pilasters) and/or finished cladding systems. Masonry

  19. Rheology limits for grout materials used for precast bent cap pile pockets in hot weather : project summary.

    DOT National Transportation Integrated Search

    2017-03-01

    The use of prefabricated bridge elements and systems (PBES) saves time and money, both for transportation agencies and the traveling public. PBES is an emphasis area in the Federal Highway Administrations Every Day Counts program in which FHWA and...

  20. Effect of voids in grouted, post-tensioned concrete bridge construction : volume 1--electrochemical testing and reliability assessment.

    DOT National Transportation Integrated Search

    2009-09-01

    Post-tensioned (PT) bridges are major structures that carry significant traffic. PT bridges are economical for spanning long distances. : In Texas, there are several signature PT bridges. In the late 1990s and early 2000s, several state highway agenc...

  1. 87. ARAIII. GCRE reactor building (ARA608) Mechanical equipment room. Utility ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    87. ARA-III. GCRE reactor building (ARA-608) Mechanical equipment room. Utility air receiver, dryer, and compressor sit on their foundations prior to grouting. December 22, 1958. Ineel photo no. 58-6429. Photographer: Ken Mansfield. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  2. Evaluation of anodes for galvanic cathodic prevention of steel corrosion in prestressed concrete piles in marine environments in Virginia.

    DOT National Transportation Integrated Search

    1999-07-01

    Many of the major highway crossings over coastal waters in the Hampton area of Virginia are supported by prestressed concrete piles, some of which are showing signs of reinforcement corrosion. Grout jacketing alone is an inadequate protection against...

  3. Flood Grouting for Infiltration Reduction on Private Side Sewers (WERF Report INFR5R11)

    EPA Science Inventory

    The sewers in Seattle’s Broadview neighborhood, built in the 1950s, experience significant inflow and infiltration. Intense wet weather events have resulted in sewer overflows into private residences and the environment and previous work indicates that the majority of this excess...

  4. 75 FR 39008 - Environmental Management Site-Specific Advisory Board, Idaho National Laboratory

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-07

    ... Dry Storage. Waste Area Group--7 Update. In-Situ Grouting. Comment Resolution--Environmental... meeting be announced in the Federal Register. DATES: Wednesday, July 14, 2010 8 a.m.-5 p.m. Opportunities... management in the areas of environmental restoration, waste management, and related activities. Tentative...

  5. Treatment of Bottled Liquid Waste During Remediation of the Hanford 618-10 Burial Ground - 13001

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Faulk, Darrin E.; Pearson, Chris M.; Vedder, Barry L.

    2013-07-01

    A problematic waste form encountered during remediation of the Hanford Site 618-10 burial ground consists of bottled aqueous waste potentially contaminated with regulated metals. The liquid waste requires stabilization prior to landfill disposal. Prior remediation activities at other Hanford burial grounds resulted in a standard process for sampling and analyzing liquid waste using manual methods. Due to the highly dispersible characteristics of alpha contamination, and the potential for shock sensitive chemicals, a different method for bottle processing was needed for the 618-10 burial ground. Discussions with the United States Department of Energy (DOE) and United States Environmental Protection Agency (EPA)more » led to development of a modified approach. The modified approach involves treatment of liquid waste in bottles, up to one gallon per bottle, in a tray or box within the excavation of the remediation site. Bottles are placed in the box, covered with soil and fixative, crushed, and mixed with a Portland cement grout. The potential hazards of the liquid waste preclude sampling prior to treatment. Post treatment verification sampling is performed to demonstrate compliance with land disposal restrictions and disposal facility acceptance criteria. (authors)« less

  6. Development of the safety control framework for shield tunneling in close proximity to the operational subway tunnels: case studies in mainland China.

    PubMed

    Li, Xinggao; Yuan, Dajun

    2016-01-01

    China's largest cities like Beijing and Shanghai have seen a sharp increase in subway network development as a result of the rapid urbanization in the last decade. The cities are still expanding their subway networks now, and many shield tunnels are being or will be constructed in close proximity to the existing operational subway tunnels. The execution plans for the new nearby shield tunnel construction calls for the development of a safety control framework-a set of control standards and best practices to help organizations manage the risks involved. Typical case studies and relevant key technical parameters are presented with a view to presenting the resulting safety control framework. The framework, created through collaboration among the relevant parties, addresses and manages the risks in a systematic way based on actual conditions of each tunnel crossing construction. The framework consists of six parts: (1) inspecting the operational subway tunnels; (2) deciding allowed movements of the existing tunnels and tracks; (3) simulating effects of the shield tunneling on the existing tunnels; (4) doing preparation work; (5) monitoring design and information management; and (6) measures and activation mechanism of the countermeasures. The six components are explained and demonstrated in detail. In the end, discussions made involve construction and post-construction settlement of the operational tunnel, application of the remedial grouting to rectify excessive settlements of the operational tunnel, and use of the innovative tool of the optical fiber measurement for tunnel movement monitoring. It is concluded that the construction movement of the tunnel can be controlled within 15 mm when the shield machine is <7 m in excavation diameter. The post-construction settlement of the tunnel buried in the very soft ground is much greater than its construction settlement, and last several years until reaching a final stable state. Two cases are outlined to demonstrate the feasibility of using the remedial grouting to reduce the long-term settlement of the operational tunnels. The more and more segmental tunnels being constructed, there is an increasing need of the optical fiber measurement for tunnel movement monitoring in the near future.

  7. Estimation of groundwater flow from temperature monitoring in a borehole heat exchanger during a thermal response test

    NASA Astrophysics Data System (ADS)

    Yoshioka, Mayumi; Takakura, Shinichi; Uchida, Youhei

    2018-05-01

    To estimate the groundwater flow around a borehole heat exchanger (BHE), thermal properties of geological core samples were measured and a thermal response test (TRT) was performed in the Tsukuba upland, Japan. The thermal properties were measured at 57 points along a 50-m-long geological core, consisting predominantly of sand, silt, and clay, drilled near the BHE. In this TRT, the vertical temperature in the BHE was also monitored during and after the test. Results for the thermal properties of the core samples and from the monitoring indicated that groundwater flow enhanced thermal transfers, especially at shallow depths. The groundwater velocities around the BHE were estimated using a two-dimensional numerical model with monitoring data on temperature changes. According to the results, the estimated groundwater velocity was generally consistent with hydrogeological data from previous studies, except for the data collected at shallow depths consisting of a clay layer. The reasons for this discrepancy at shallow depths were predicted to be preferential flow and the occurrence of vertical flow through the BHE grout, induced by the hydrogeological conditions.

  8. 3. Photographic copy of photograph dated 1941; Gerald Young, Chicago, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. Photographic copy of photograph dated 1941; Gerald Young, Chicago, photographer; Original in Rath collection at Grout Museum, Waterloo, Iowa; Filed under: Rath Parking Company, Box 5; SKINNING CATTLE IN THE OLD BEEF HOUSE - Rath Packing Company, Cooler Building-1929 Beef House, Sycamore Street between Elm & Eighteenth Streets, Waterloo, Black Hawk County, IA

  9. 40 CFR 440.132 - General definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... grouting the tailings pond or wastewater holding facility. (e) “In-situ leach methods” means the processes... land on or in which grading has been completed to return the earth to desired contour and reclamation... evaporation data. (c) “Appropriate treatment of the recycle water” in subpart J, § 440.104 includes, but is...

  10. Reinforcing mechanism of anchors in slopes: a numerical comparison of results of LEM and FEM

    NASA Astrophysics Data System (ADS)

    Cai, Fei; Ugai, Keizo

    2003-06-01

    This paper reports the limitation of the conventional Bishop's simplified method to calculate the safety factor of slopes stabilized with anchors, and proposes a new approach to considering the reinforcing effect of anchors on the safety factor. The reinforcing effect of anchors can be explained using an additional shearing resistance on the slip surface. A three-dimensional shear strength reduction finite element method (SSRFEM), where soil-anchor interactions were simulated by three-dimensional zero-thickness elasto-plastic interface elements, was used to calculate the safety factor of slopes stabilized with anchors to verify the reinforcing mechanism of anchors. The results of SSRFEM were compared with those of the conventional and proposed approaches for Bishop's simplified method for various orientations, positions, and spacings of anchors, and shear strengths of soil-grouted body interfaces. For the safety factor, the proposed approach compared better with SSRFEM than the conventional approach. The additional shearing resistance can explain the influence of the orientation, position, and spacing of anchors, and the shear strength of soil-grouted body interfaces on the safety factor of slopes stabilized with anchors.

  11. Mine-induced sinkholes over the U.S. Strategic Petroleum Reserve (SPR) Storage Facility at Weeks Island, Louisiana: geological mitigation and environmental monitoring

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neal, J.T.

    1997-03-01

    A sinkhole formed over the former salt mine used for crude oil storage by the U.S. Strategic Petroleum Reserve at Weeks Island, Louisiana. This created a dilemma because in-mine grouting was not possible, and external grouting, although possible, was impractical. However, environmental protection during oil withdrawal and facility decommissioning was considered critical and alternative solutions were essential. Mitigation of, the sinkhole growth over the salt mine was accomplished by injecting saturated brine directly into the sinkhole throat, and by constructing a cylindrical freeze curtain around and into the dissolution orifice at the top of the salt dome. These measures vastlymore » reduced the threat of major surface collapse around the sinkhole during oil transfer and subsequent brine backfill. The greater bulk of the crude oil was removed from the mine during 1995-6. Final skimming operations will remove residual oil trapped in low spots, concurrent with initiating backfill of the mine with saturated brine. Environmental monitoring during 1995-9 will assure that environmental surety is achieved.« less

  12. Human enteric viruses in groundwater from a confined bedrock aquifer

    USGS Publications Warehouse

    Borchardt, M. A.; Bradbury, K.R.; Gotkowitz, M.B.; Cherry, J.A.; Parker, B.L.

    2007-01-01

    Confined aquifers are overlain by low-permeability aquitards that are commonly assumed to protect underlying aquifers from microbial contaminants. However, empirical data on microbial contamination beneath aquitards is limited. This study determined the occurrence of human pathogenic viruses in well water from a deep sandstone aquifer confined by a regionally extensive shale aquitard. Three public water-supply wells were each sampled 10 times over 15 months. Samples were analyzed by reverse transcription-polymerase chain reaction (RT-PCR) for several virus groups and by cell culture for infectious enteroviruses. Seven of 30 samples were positive by RT-PCR for enteroviruses; one of these was positive for infectious echovirus 18. The virus-positive samples were collected from two wells cased through the aquitard, indicating the viruses were present in the confined aquifer. Samples from the same wells showed atmospheric tritium, indicating water recharged within the past few decades. Hydrogeologic conditions support rapid porous media transport of viruses through the upper sandstone aquifer to the top of the aquitard 61 m below ground surface. Natural fractures in the shale aquitard are one possible virus transport pathway through the aquitard; however, windows, cross-connecting well bores, or imperfect grout seals along well casings also may be involved. Deep confined aquifers can be more vulnerable to contamination by human viruses than commonly believed. ?? 2007 American Chemical Society.

  13. Vibration Based Wind Turbine Tower Foundation Design Utilizing Soil-Foundation-Structure Interaction

    NASA Astrophysics Data System (ADS)

    Al Satari, P. E. Mohamed; Hussain, S. E. Saif

    2008-07-01

    Wind turbines have been used to generate electricity as an alternative energy source to conventional fossil fuels. This case study is for multiple wind towers located at different villages in Alaska where severe arctic weather conditions exist. The towers are supported by two different types of foundations; large mat or deep piles foundations. Initially, a Reinforced Concrete (RC) mat foundation was utilized to provide the system with vertical and lateral support. Where soil conditions required it, a pile foundation solution was devised utilizing a 30″ thick RC mat containing an embedded steel grillage of W18 beams supported by 20″-24″ grouted or un-grouted piles. The mixing and casting of concrete in-situ has become the major source of cost and difficulty of construction at these remote Alaska sites. An all-steel foundation was proposed for faster installation and lower cost, but was found to impact the natural frequencies of the structural system by significantly softening the foundation system. The tower-foundation support structure thus became near-resonant with the operational frequencies of the wind turbine leading to a likelihood of structural instability or even collapse. A detailed 3D Finite-Element model of the original tower-foundation-pile system with RC foundation was created using SAP2000. Soil springs were included in the model based on soil properties obtained from the geotechnical consultant. The natural frequency from the model was verified against the tower manufacturer analytical and the experimental values. Where piles were used, numerous iterations were carried out to eliminate the need for the RC and optimize the design. An optimized design was achieved with enough separation between the natural and operational frequencies to prevent damage to the structural system eliminating the need for any RC encasement to the steel foundation or grouting to the piles.

  14. Evaluation of Settler Tank Thermal Stability during Solidification and Disposition to ERDF

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stephenson, David E.; Delegard, Calvin H.; Schmidt, Andrew J.

    2015-03-30

    Ten 16-foot-long and 20-inch diameter horizontal tanks currently reside in a stacked 2×5 (high) array in the ~20,000-gallon water-filled Weasel Pit of the 105-KW Fuel Storage Basin on the US-DOE Hanford Site. These ten tanks are part of the Integrated Water Treatment System used to manage water quality in the KW Basin and are called “settler” tanks because of their application in removing particles from the KW Basin waters. Based on process knowledge, the settler tanks are estimated to contain about 124 kilograms of finely divided uranium metal, 22 kg of uranium dioxide, and another 55 kg of other radioactivemore » sludge. The Sludge Treatment Project (STP), managed by CH2MHill Plateau Remediation Company (CHPRC) is charged with managing the settler tanks and arranging for their ultimate disposal by burial in ERDF. The presence of finely divided uranium metal in the sludge is of concern because of the potential for thermal runaway reaction of the uranium metal with water and the formation of flammable hydrogen gas as a product of the uranium-water reaction. Thermal runaway can be instigated by external heating. The STP commissioned a formal Decision Support Board (DSB) to consider options and provide recommendations to manage and dispose of the settler tanks and their contents. Decision criteria included consideration of the project schedule and longer-term deactivation, decontamination, decommissioning, and demolition (D4) of the KW Basin. The DSB compared the alternatives and recommended in-situ grouting, size-reduction, and ERDF disposal as the best of six candidate options for settler tank treatment and disposal. It is important to note that most grouts contain a complement of Portland cement as the binding agent and that Portland cement curing reactions generate heat. Therefore, concern is raised that the grouting of the settler tank contents may produce heating sufficient to instigate thermal runaway reactions in the contained uranium metal sludge.« less

  15. Development of Airblast and Soil Strength Instrumentation.

    DTIC Science & Technology

    1980-02-01

    and nushing on a small reservior of mercury. The bar jauge , contained within the probe along its axis, wou! have its sensitive end §orm -no 6 2 of the...Figure 44. Gauge Placement for Single trength (rc 3hocked-Mer ium Experiment:;. :2nd "’, w. grout medium. The acceleration of the soil strength , jauge

  16. Planning and design considerations in karst terrain

    NASA Astrophysics Data System (ADS)

    Fischer, J. A.; Greene, R. W.; Ottoson, R. S.; Graham, T. C.

    1988-10-01

    This article discusses the various steps that the authors feel are necessary to the successful progression of an engineered project sited in karst terrain. The procedures require a multidisciplined approach with liaison and cooperation among the various parties to the project. Initially, the prospective owner must have sufficient understanding of the potential engineering problems to incorporate the engineering geologist into the early stages of any planned acquisition. The first step in an investigation should include a review of the available geologic information, aerial photo interpretation, consultation with the State Geological Survey, and a geologic reconnaissance of the prospective site and surrounding area. A go-no-go decision as to purchase can often been made at an early time. Although, in some instances, more study is needed for a particularly intriguing property. The second stage should consider the various planning alternatives that are feasible based upon the limited available information. At this stage planning/purchase decisions can be made as to purchasing options, value of the property, design constraints, and the possible economic penalties that could be associated with the potential site construction. Various planning and construction alternatives should be considered in this phase of the work. The third stage should include a site investigation program of moderate size, consisting of test pits and/or exploratory borings. The borings should be drilled using water as the drilling fluid, with an experienced crew and qualified technical inspection. The authors find the use of geophysical techniques can be extremely misleading unless used in conjunction with exploratory drilling. Successful evaluations using geophysical procedures occur only under ideal conditions. The geotechnical viability of the plan and preliminary design should be investigated in the fourth phase. Additionally, the physical parameters required for the design of structures founded atop cavities can be obtained at this time. Several support schemes which incorporate cavity roof thickness, rock strength, and cavity space are discussed. Possible construction procedures include excavation and dental concrete, grouting, piers or piles to sound rock, or moving to another area. The relative economies of these procedures are discussed in relation to the size and depth of the soil or rock cavity, possible future cavity formation, magnitude of loading and acceptable safety factors.

  17. The Physical Behavior of Stabilised Soft Clay by Electrokinetic Stabilisation Technology

    NASA Astrophysics Data System (ADS)

    Azhar, A. T. S.; Nordin, N. S.; Azmi, M. A. M.; Embong, Z.; Sunar, N.; Hazreek, Z. A. M.; Aziman, M.

    2018-04-01

    Electrokinetic Stabilisation (EKS) technology is the combination processes of electroosmosis and chemical grouting. This technique is most effective in silty and clayey soils where the hydraulic conductivity is very low. Stabilising agents will assist the EKS treatment by inducing it into soil under direct current. The movement of stabilising agents into soil is governed by the principle of electrokinetics. The aim of this study is to evaluate the physical behavior of soft soil using the EKS technology as an effective method to strengthen soft clay soils with calcium chloride (CaCl2) as the stabilising agent. Stainless steel plates were used as the electrodes, while 1.0 mol/l of CaCl2 was used as the electrolyte that fed at the anode compartment. Soft marine clay at Universiti Tun Hussein Onn Malaysia was used as the soil sample. The EKS treatment was developed at Research Centre for Soft Soil (RECESS), UTHM with a constant voltage gradient (50 V/m) in 21 days. The result shows that the shear strength of treated soil was increased across the soil sample. The treated soil near the cathode showed the highest value of shear strength (24.5 – 33 kPa) compared with the anode and in the middle of the soil sample.

  18. Grounding and Shielding Requirements for the Radiation and EMP Environments of an Underground Nuclear Test

    DTIC Science & Technology

    1978-03-17

    the trailers as Electro-magnetic Interference ( EMI ) tight as possible; such items included removal of all unnecessary wiring penetrations, conductive...20 12. CABLE TRAYS, GROUT-FILLED ............ .................. 21 13. THE MESA TRAILER PARK CONSIDERATIONS...enclosed cable shields. 12. The mesa trailer park received some attention regarding the GSP, although not as intense as the tunnel environment. Specifically

  19. Contaminant Flux Reduction Barriers for Managing Difficult to Treat Source Zones in Unconsolidated Media

    DTIC Science & Technology

    2017-06-20

    39  Table 7.4:  Description of Case Study Site... Research Flux Reduction Materials: Several novel silica gel/vegetable oil- formulations were developed and tested in lab-scale batch and column studies by...Demonstration Results The project demonstration had these results:  Two grout mixtures were selected based on gel tests and a treatability study by

  20. A Review of Rock Bolt Monitoring Using Smart Sensors.

    PubMed

    Song, Gangbing; Li, Weijie; Wang, Bo; Ho, Siu Chun Michael

    2017-04-05

    Rock bolts have been widely used as rock reinforcing members in underground coal mine roadways and tunnels. Failures of rock bolts occur as a result of overloading, corrosion, seismic burst and bad grouting, leading to catastrophic economic and personnel losses. Monitoring the health condition of the rock bolts plays an important role in ensuring the safe operation of underground mines. This work presents a brief introduction on the types of rock bolts followed by a comprehensive review of rock bolt monitoring using smart sensors. Smart sensors that are used to assess rock bolt integrity are reviewed to provide a firm perception of the application of smart sensors for enhanced performance and reliability of rock bolts. The most widely used smart sensors for rock bolt monitoring are the piezoelectric sensors and the fiber optic sensors. The methodologies and principles of these smart sensors are reviewed from the point of view of rock bolt integrity monitoring. The applications of smart sensors in monitoring the critical status of rock bolts, such as the axial force, corrosion occurrence, grout quality and resin delamination, are highlighted. In addition, several prototypes or commercially available smart rock bolt devices are also introduced.

  1. Masonry arches retrofitted with steel reinforced grout materials: In-situ experimental tests and advanced FE simulations

    NASA Astrophysics Data System (ADS)

    Bertolesi, Elisa; Carozzi, Francesca Giulia; Milani, Gabriele; Poggi, Carlo

    2017-11-01

    The paper presents the results of a series of in-situ tests carried out on two masonry arches, one unreinforced and the other reinforced with SRG (Steel Reinforced Grout). The arches are built adopting a peculiar construction technique using common Italian bricks with dimensions 250 × 120 × 55 mm3 and 10 mm thick mortar joints. One of the two arches has been reinforced with an SRG material constituted by an inox grid embedded into a layer of lime mortar, whereas the second one is maintained unreinforced for comparison purposes. The experimental set-up is designed to apply an eccentric vertical load placed at ¼ of the span in a series of loading and unloading cycles up to the failure. The numerical analyses have been performed using a sophisticated heterogeneous micro-modeling technique, where bricks, mortar joints and the strengthening have been modeled separately. Finally, the numerical outcomes have been comparatively assessed with respect to the experimental results and the crack patterns obtained at the end of the tests, showing a satisfactory agreement in terms of the global behavior of the arches and their collapse mechanisms.

  2. Finite element modeling of borehole heat exchanger systems. Part 1. Fundamentals

    NASA Astrophysics Data System (ADS)

    Diersch, H.-J. G.; Bauer, D.; Heidemann, W.; Rühaak, W.; Schätzl, P.

    2011-08-01

    Single borehole heat exchanger (BHE) and arrays of BHE are modeled by using the finite element method. The first part of the paper derives the fundamental equations for BHE systems and their finite element representations, where the thermal exchange between the borehole components is modeled via thermal transfer relations. For this purpose improved relationships for thermal resistances and capacities of BHE are introduced. Pipe-to-grout thermal transfer possesses multiple grout points for double U-shape and single U-shape BHE to attain a more accurate modeling. The numerical solution of the final 3D problems is performed via a widely non-sequential (essentially non-iterative) coupling strategy for the BHE and porous medium discretization. Four types of vertical BHE are supported: double U-shape (2U) pipe, single U-shape (1U) pipe, coaxial pipe with annular (CXA) and centred (CXC) inlet. Two computational strategies are used: (1) The analytical BHE method based on Eskilson and Claesson's (1988) solution, (2) numerical BHE method based on Al-Khoury et al.'s (2005) solution. The second part of the paper focusses on BHE meshing aspects, the validation of BHE solutions and practical applications for borehole thermal energy store systems.

  3. A Review of Rock Bolt Monitoring Using Smart Sensors

    PubMed Central

    Song, Gangbing; Li, Weijie; Wang, Bo; Ho, Siu Chun Michael

    2017-01-01

    Rock bolts have been widely used as rock reinforcing members in underground coal mine roadways and tunnels. Failures of rock bolts occur as a result of overloading, corrosion, seismic burst and bad grouting, leading to catastrophic economic and personnel losses. Monitoring the health condition of the rock bolts plays an important role in ensuring the safe operation of underground mines. This work presents a brief introduction on the types of rock bolts followed by a comprehensive review of rock bolt monitoring using smart sensors. Smart sensors that are used to assess rock bolt integrity are reviewed to provide a firm perception of the application of smart sensors for enhanced performance and reliability of rock bolts. The most widely used smart sensors for rock bolt monitoring are the piezoelectric sensors and the fiber optic sensors. The methodologies and principles of these smart sensors are reviewed from the point of view of rock bolt integrity monitoring. The applications of smart sensors in monitoring the critical status of rock bolts, such as the axial force, corrosion occurrence, grout quality and resin delamination, are highlighted. In addition, several prototypes or commercially available smart rock bolt devices are also introduced. PMID:28379167

  4. NRC Consultation and Monitoring at the Savannah River Site: Focusing Reviews of Two Different Disposal Actions - 12181

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ridge, A. Christianne; Barr, Cynthia S.; Pinkston, Karen E.

    Section 3116 of the Ronald W. Reagan National Defense Authorization Act for Fiscal Year 2005 (NDAA) requires the U.S. Department of Energy (DOE) to consult with the U.S. Nuclear Regulatory Commission (NRC) for certain non-high level waste determinations. The NDAA also requires NRC to monitor DOE's disposal actions related to those determinations. In Fiscal Year 2011, the NRC staff reviewed DOE performance assessments for tank closure at the F-Tank Farm (FTF) Facility and salt waste disposal at the Saltstone Disposal Facility (SDF) at the Savannah River Site (SRS) as part of consultation and monitoring, respectively. Differences in inventories, waste forms,more » and key barriers led to different areas of focus in the NRC reviews of these two activities at the SRS. Because of the key role of chemically reducing grouts in both applications, the evaluation of chemical barriers was significant to both reviews. However, radionuclide solubility in precipitated metal oxides is expected to play a significant role in FTF performance whereas release of several key radionuclides from the SDF is controlled by sorption or precipitation within the cementitious wasteform itself. Similarly, both reviews included an evaluation of physical barriers to flow, but differences in the physical configurations of the waste led to differences in the reviews. For example, NRC's review of the FTF focused on the modeled degradation of carbon steel tank liners while the staff's review of the SDF performance included a detailed evaluation of the physical degradation of the saltstone wasteform and infiltration-limiting closure cap. Because of the long time periods considered (i.e., tens of thousands of years), the NRC reviews of both facilities included detailed evaluation of the engineered chemical and physical barriers. The NRC staff reviews of residual waste disposal in the FTF and salt waste disposal in the SDF focused on physical barriers to flow and chemical barriers to radionuclide release from the waste. Because the waste inventory and concentration at both sites is sufficient to generate unacceptable doses to an off-site member of the public or inadvertent intruder in the absence of engineered barriers, the NRC staff review focused on the engineering features DOE plans to put in place to limit radionuclide release. At the FTF, DOE expects that peak doses are delayed beyond a 10,000 year performance period by a combination of (1) the flow-limiting effect of the steel tank liner and (2) chemical conditions created by the stabilizing grout overlying the waste that limit the solubility of key radionuclides for tens of thousands of years. At the SDF, DOE expects that flow will be significantly limited by water shedding along the closure cap lower drainage layer and that radionuclide release will be further limited by radionuclide precipitation or sorption within the high pH, chemically reducing conditions created within the saltstone waste form. Because the performance of both facilities depends on the performance of engineered barriers for thousands of years, the reviews included a detailed evaluation of the expected long-term behavior of these barriers. As previously discussed, NRC staff reviews of DOE waste determinations during consultation are designed to evaluate the three NDAA criteria, whereas the review of an updated PA during monitoring only addresses whether the NRC staff has reasonable assurance that the planned disposal action will meet the performance objectives of 10 CFR Part 61. The NRC staff review of the Waste Determination for the FTF did not include conclusions about whether the planned disposal of residual waste at the FTF would meet the NDAA criteria because of the substantial uncertainties in the degree of waste removal DOE would achieve and other technical uncertainties. The main product of the NRC staff review of the planned FTF disposal action is the recommendation that DOE should conduct waste release experiments to increase support for key modeling assumptions related to: (1) the evolution of pH and Eh in the grouted tank system over time; (2) identification of HRR association with solid phases comprising the residual wastes; and (3) expected solubility of HRRs under a range of environmental or service conditions that the residual wastes in the contaminated zone are expected to be exposed to over time. Implementation of this recommendation is deemed crucial for NRC staff to have reasonable assurance that the performance objectives in 10 CFR Part 61, Subpart C can be met. Given the risk-significance of Tank 18 to the overall PA and the short timeline for closure of this tank, the NRC staff recommended that DOE should initiate discussions with NRC staff regarding implementation of this recommendation for Tank 18 as soon as practical. The NRC staff also recommended that experiments to address this recommendation should be conducted prior to final closure of Tank 18. Results of the Tank 18 residual waste experiments, if conducted, will be evaluated by NRC staff to determine the need for additional data collection, experiments, and modeling for Tank 18, as well as other FTF tanks. Additional information regarding the NRC staff's recommendations in this area, including details on the suggested implementation of other recommendations will be provided in the NRC staff's plan for monitoring the FTF later in FY 2012, after DOE makes a final decision on the waste determination. The NRC staff's review of waste disposal at the SDF is ongoing. When complete, the SDF TER will indicate whether the NRC staff continues to have reasonable assurance that waste disposal at the SDF will meet the performance objectives of 10 CFR Part 61 (NDAA Criterion 3). The TER also will include risk insights that will form the basis of the NRC staff's revised monitoring plan for the SDF. The NRC staff will publish an updated monitoring plan for the SDF later in FY 2012. (authors)« less

  5. An Overview of the Geological and Geotechnical Aspects of the New Railway Line in the Lower Inn Valley

    NASA Astrophysics Data System (ADS)

    Eder, Stefan; Poscher, Gerhard; Sedlacek, Christoph

    The new railway line in the lower Inn-valley is part of the Brenner railway axis from Munich to Verona (feeder north). The first section between the villages of Kundl and Radfeld, west of Wörgl, and the village of Baumkirchen, east of Innsbruck, will become one of the biggest infrastructure projects ever built in Austria, with a length of approx. 43 km and an underground portion of approx. 80%. The article gives an overview of the various geologic formations - hard rock sections in the valley slopes, different water-saturated gravel and sand formations in the valley floor and geotechnically difficult conditions in sediments of Quaternary terraces. It also describes the methodology of the soil reconnaissance using groundwater models for hydrogeologic estimations, core drillings for evaluating geologic models and describes the experiences gained from the five approx. 7.5 km long reconnaissance tunnels for geotechnical and hydrogeological testing. The results of the soil reconnaissance were used to plan different construction methods, such as excavation in soft rock under a jet grouting roof and compressed-air, as well as mechanised shield with fluid support.

  6. 15. Photographic copy of photograph dated ca. 1929; Photographer unknown; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Photographic copy of photograph dated ca. 1929; Photographer unknown; Original in Rath collection at Grout Museum, Waterloo, Iowa; Filed under: Rath Packing Company, Box 4; THE RATH COMPLEX IN THE LATE 1920S; LOOKING WEST FROM 18TH STREET; LARGE BUILDING AT CENTER IS HOG KILL (BUILDING 40) - Rath Packing Company, Sycamore Street between Elm & Eighteenth Streets, Waterloo, Black Hawk County, IA

  7. Technical Guidance Manual: Contaminant Flux Reduction Barriers for Managing Difficult-to-Treat Source Zones in Unconsolidated Media

    DTIC Science & Technology

    2017-06-20

    was to evaluate if inexpensive flow reduction agents delivered via permeation grouting technology could help manage difficult-to-treat chlorinated...30  Table 4.  Description of Case Study Site ................................................................................... 30  Table 5...Intentionally Left Blank ES-1 EXECUTIVE SUMMARY Project Objective The overall objective of this project was to evaluate if inexpensive flow reduction

  8. The influence of different geotechnically relevant amendments on the reductive degradation of TCE by nZVI

    NASA Astrophysics Data System (ADS)

    Freitag, Peter; Schöftner, Philipp; Waldner, Georg; Reichenauer, Thomas G.; Nickel, Claudia; Spitz, Marcus; Dietzel, Martin

    2014-05-01

    Trichloroethylene (TCE) was widely used as a cleaning and degreasing agent. Companies needing these agents were often situated in or close to built up areas, so spillage led to contaminated sites which now can only be remediated using in situ techniques. The situation is compounded by the fact that TCE tends to seep through ground water bodies forming pools at the bottom of the aquifer. When reacting with TCE, nanoscale zero valent iron (nZVI) is known to reduce it into non-toxic substances. The difficulty is to bring it in contact with the pollutant. Attempts using passive insertion into the groundwater via wells yielded mixed results. Reasons for this are that ZVI tends to coagulate, to sediment and to adsorb on the matrix of the aquifer. Also, in inhomogeneous aquifers a passive application of nZVI can be difficult and might not bring the desired results, due to existence of preferential flow paths. A possible solution to this problem is the physical in situ mixing of ZVI into the contaminant source. This can, in principle, be done by adapting jet grouting - a method that uses a high pressure slurry jet, consisting of water and geotechnical additives ("binders"), to mix and compact zones ("columns") in soil. These columns are commonly used to solve foundation problems but can also be used to solve the problem of delivering nZVI to TCE source zones. This paper examines the influence binders have on the degradation reaction between TCE and nZVI. The necessity of these binders is explained by the fact that the subsoil structure is rearranged during the jetting process leading to subsidence on the surface. These subsidences could result in damage to neighbouring structures. A series of batch experiments was conducted in this study. Contaminated groundwater was brought into contact with samples of slurries commonly used in geotechnical applications. We tested the effects of concresole, bentonite, zeolithe, fly ash, slag sand and cement on the kinetics of TCE degradation by nZVI. The degradation of TCE was measured using GC Headspace samples. Furthermore, additional experiments were conducted to investigate the interaction between binders and TCE as well as binders and nZVI. The results of these experiments led to the conclusion that jet grouting could be well suited for the delivery of nZVI to TCE contaminated source zones. Currently, soil column experiments and large-scale experiments in test facilities are performed to confirm the batch testing results.

  9. Demonstration and Validation of a Lightweight Composite Bridge Deck Technology as an Alternative to Reinforced Concrete

    DTIC Science & Technology

    2016-08-01

    Abstract Cyclic loading and weathering of reinforced concrete bridge decks cause corrosion of reinforcement steel , which leads to cracking, potholes...inforcement steel , on a deteriorated concrete bridge at Redstone Arsenal, AL. A pultruded deck system made by Zellcomp, Inc., was selected for...16 Figure 13. Form for grout haunch fabricated by tack welding steel strips to the top of the girder

  10. Engineering Properties of Resin Modified Pavement (RMP) for Mechanistic Design

    DTIC Science & Technology

    2000-03-01

    conducted by personnel of the Airfields and Pavements Division (APD), Geotechnical Laboratory (GL), ERDC, Vicksburg, MS, during the period October 1995...mixture and resin modified portland cement grout are produced and placed separately . The RMP is typically a 50-mm-thick layer placed on top of a...military installations in the following years. The Federal Aviation Administration, also eager to develop an alternative paving material technology

  11. Roof instability characteristics and pre-grouting of the roof caving zone in residual coal mining

    NASA Astrophysics Data System (ADS)

    Zhao, Tong; Liu, Changyou

    2017-12-01

    Abandoned roadways and roof caving zones are commonly found in residual coal, and can destroy the integrity of the coal seam and roof. Resulting from mining-induced stress, continuous collapse and fracture instability in roof caving zones (RCZs) jeopardize the safety and efficiency of residual coal mining. Based on the engineering geology conditions of remining face 3101 in Shenghua Mine, the roof fracture and instability features of the RCZ were analyzed through physical simulation, theoretical analysis, and field measurements. In this case, influenced by the RCZ, the main roof across the RCZ fractured and rotated towards the goaf, greatly increasing the working resistance, and crushing the supports. The sudden instability of the coal pillars weakened its support of the main roof, thus resulting in long-key blocks across the RCZ and hinged roof structures, which significantly decreased the stability of the underlying immediate roof. This study establishes a mechanical model for the interactions between the surrounding rock and the supports in the RCZ, determines the reasonable working resistance, and examines the use of pre-grouting solidification restoration technology (PSRT) to solidify the RCZ and reinforce the coal pillars—thus increasing their bearing capacity. Field measurements revealed no roof flaking, inhomogeneous loading or support crushing, indicating that the PSRT effectively controlled the surrounding rock of the RCZ.

  12. Evaluating temporal changes in hydraulic conductivities near karst-terrain dams: Dokan Dam (Kurdistan-Iraq)

    NASA Astrophysics Data System (ADS)

    Dafny, Elad; Tawfeeq, Kochar Jamal; Ghabraie, Kazem

    2015-10-01

    Dam sites provide an outstanding opportunity to explore dynamic changes in the groundwater flow regime because of the high hydraulic gradient rapidly induced in their surroundings. This paper investigates the temporal changes of the hydraulic conductivities of the rocks and engineered structures via a thorough analysis of hydrological data collected at the Dokam Dam, Iraq, and a numerical model that simulates the Darcian component of the seepage. Analysis of the data indicates increased seepage with time and suggests that the hydraulic conductivity of the rocks increased as the conductivity of the grout curtain decreased. Conductivity changes on the order of 10-8 m/s, in a 20-yr period were quantified using the numerical analysis. It is postulated that the changes in hydraulic properties in the vicinity of Dokan Dam are due to suspension of fine materials, interbedded in small fissures in the rocks, and re-settlement of these materials along the curtain. Consequently, the importance of the grout curtain to minimize the downstream seepage, not only as a result of the conductivity contrast with the rocks, but also as a barrier to suspended clay sediments, is demonstrated. The numerical analysis also helped us to estimate the proportion of the disconnected karstic conduit flow to the overall flow.

  13. Space geodetic monitoring of engineered structures: The ongoing destabilization of the Mosul dam, Iraq.

    PubMed

    Milillo, Pietro; Bürgmann, Roland; Lundgren, Paul; Salzer, Jacqueline; Perissin, Daniele; Fielding, Eric; Biondi, Filippo; Milillo, Giovanni

    2016-12-06

    We present a detailed survey of the ongoing destabilization process of the Mosul dam. The dam is located on the Tigris river and is the biggest hydraulic structure in Iraq. From a geological point of view the dam foundation is poor due to a site geology formed by alternating strata of highly soluble materials including gypsum, anhydrite, marl and limestone. Here we present the first multi-sensor cumulative deformation map for the dam generated from space-based interferometric synthetic aperture radar measurements from the Italian constellation COSMO-SkyMed and the European sensor Sentinel-1a over the period 2014-2016 that we compare to an older dataset spanning 2004-2010 acquired with the European Envisat satellite. We found that deformation was rapid during 2004-2010, slowed in 2012-2014 and increased since August 2014 when grouting operations stopped due to the temporary capture of the dam by the self proclaimed Islamic State. We model the inferred deformation using a Markov chain Monte Carlo approach to solve for change in volume for simple tensile dislocations. Results from recent and historical geodetic datasets suggests that the volume dissolution rate remains constant when the equivalent volume of total concrete injected during re-grouting operations is included in the calculations.

  14. Space geodetic monitoring of engineered structures: The ongoing destabilization of the Mosul dam, Iraq

    PubMed Central

    Milillo, Pietro; Bürgmann, Roland; Lundgren, Paul; Salzer, Jacqueline; Perissin, Daniele; Fielding, Eric; Biondi, Filippo; Milillo, Giovanni

    2016-01-01

    We present a detailed survey of the ongoing destabilization process of the Mosul dam. The dam is located on the Tigris river and is the biggest hydraulic structure in Iraq. From a geological point of view the dam foundation is poor due to a site geology formed by alternating strata of highly soluble materials including gypsum, anhydrite, marl and limestone. Here we present the first multi-sensor cumulative deformation map for the dam generated from space-based interferometric synthetic aperture radar measurements from the Italian constellation COSMO-SkyMed and the European sensor Sentinel-1a over the period 2014–2016 that we compare to an older dataset spanning 2004–2010 acquired with the European Envisat satellite. We found that deformation was rapid during 2004–2010, slowed in 2012–2014 and increased since August 2014 when grouting operations stopped due to the temporary capture of the dam by the self proclaimed Islamic State. We model the inferred deformation using a Markov chain Monte Carlo approach to solve for change in volume for simple tensile dislocations. Results from recent and historical geodetic datasets suggests that the volume dissolution rate remains constant when the equivalent volume of total concrete injected during re-grouting operations is included in the calculations. PMID:27922128

  15. Space geodetic monitoring of engineered structures: The ongoing destabilization of the Mosul dam, Iraq

    NASA Astrophysics Data System (ADS)

    Milillo, Pietro; Bürgmann, Roland; Lundgren, Paul; Salzer, Jacqueline; Perissin, Daniele; Fielding, Eric; Biondi, Filippo; Milillo, Giovanni

    2016-12-01

    We present a detailed survey of the ongoing destabilization process of the Mosul dam. The dam is located on the Tigris river and is the biggest hydraulic structure in Iraq. From a geological point of view the dam foundation is poor due to a site geology formed by alternating strata of highly soluble materials including gypsum, anhydrite, marl and limestone. Here we present the first multi-sensor cumulative deformation map for the dam generated from space-based interferometric synthetic aperture radar measurements from the Italian constellation COSMO-SkyMed and the European sensor Sentinel-1a over the period 2014-2016 that we compare to an older dataset spanning 2004-2010 acquired with the European Envisat satellite. We found that deformation was rapid during 2004-2010, slowed in 2012-2014 and increased since August 2014 when grouting operations stopped due to the temporary capture of the dam by the self proclaimed Islamic State. We model the inferred deformation using a Markov chain Monte Carlo approach to solve for change in volume for simple tensile dislocations. Results from recent and historical geodetic datasets suggests that the volume dissolution rate remains constant when the equivalent volume of total concrete injected during re-grouting operations is included in the calculations.

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jain, V.; Shah, H.; Bannochie, C. J.

    Mercury (Hg) in the Savannah River Site Liquid Waste System (LWS) originated from decades of canyon processing where it was used as a catalyst for dissolving the aluminum cladding of reactor fuel. Approximately 60 metric tons of mercury is currently present throughout the LWS. Mercury has long been a consideration in the LWS, from both hazard and processing perspectives. In February 2015, a Mercury Program Team was established at the request of the Department of Energy to develop a comprehensive action plan for long-term management and removal of mercury. Evaluation was focused in two Phases. Phase I activities assessed themore » Liquid Waste inventory and chemical processing behavior using a system-by-system review methodology, and determined the speciation of the different mercury forms (Hg+, Hg++, elemental Hg, organomercury, and soluble versus insoluble mercury) within the LWS. Phase II activities are building on the Phase I activities, and results of the LWS flowsheet evaluations will be summarized in three reports: Mercury Behavior in the Salt Processing Flowsheet (i.e. this report); Mercury Behavior in the Defense Waste Processing Facility (DWPF) Flowsheet; and Mercury behavior in the Tank Farm Flowsheet (Evaporator Operations). The evaluation of the mercury behavior in the salt processing flowsheet indicates, inter alia, the following: (1) In the assembled Salt Batches 7, 8 and 9 in Tank 21, the total mercury is mostly soluble with methylmercury (MHg) contributing over 50% of the total mercury. Based on the analyses of samples from 2H Evaporator feed and drop tanks (Tanks 38/43), the source of MHg in Salt Batches 7, 8 and 9 can be attributed to the 2H evaporator concentrate used in assembling the salt batches. The 2H Evaporator is used to evaporate DWPF recycle water. (2) Comparison of data between Tank 21/49, Salt Solution Feed Tank (SSFT), Decontaminated Salt Solution Hold Tank (DSSHT), and Tank 50 samples suggests that the total mercury as well as speciated forms in the assembled salt batches in Tanks 21/49 pass through the Actinide Removal Process (ARP) / Modular Caustic Side Solvent Extraction Unit (MCU) process to Tank 50 with no significant change in the mercury chemistry. (3) In Tank 50, Decontaminated Salt Solution (DSS) from ARP/MCU is the major contributor to the total mercury including MHg. (4) Speciation analyses of TCLP leached solutions of the grout samples prepared from Tank 21, as well as Tank 50 samples, show the majority of the mercury released in the solution is MHg.« less

  17. Seals, Concrete Anchors, and Connections

    DTIC Science & Technology

    1989-02-01

    brick. Medium to heavy I.. loads cannot be safely fastened to soft masonry materials (stuc-. : - . co. grout. plaster or plasterboard ) since such...588C, Type 1. Class A. Style 1 Use in: All masonry material Use in: Block, wallboard , plaster , hollow tile Use with: Sheet metal, wood or lag screws... Wallboard . plaster , paneling Use in: Wallboard or solid masonry Use with: No (- oer fastener needed Use with: Sheet metal screw Made of: Ste( Made of

  18. Waste Receiving and Processing Facility Module 2A: Advanced Conceptual Design Report. Volume 3A

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Objective of this document is to provide descriptions of all WRAP 2A feed streams, including physical and chemical attributes, and describe the pathway that was used to select data for volume estimates. WRAP 2A is being designed for nonthermal treatment of contact-handled mixed low-level waste Category 1 and 3. It is based on immobilization and encapsulation treatment using grout or polymer.

  19. 2. Photographic copy of photograph dated 1941; Gerald Young, Chicago, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. Photographic copy of photograph dated 1941; Gerald Young, Chicago, photographer; Original in Rath collection at Grout Museum, Waterloo, Iowa; Filed under: Rath Parking Company, Box 5; REMOVING HIDES ON THE FLOOR IN OLD BEEF HOUSE; SHARPENED PRITCH STICKS SET INTO DEEP GROOVES ON THE FLOOR PLATES HELD CARCASSES IN POSITION FOR SKINNING - Rath Packing Company, Cooler Building-1929 Beef House, Sycamore Street between Elm & Eighteenth Streets, Waterloo, Black Hawk County, IA

  20. Well installation and documentation, and ground-water sampling protocols for the pilot National Water-Quality Assessment Program

    USGS Publications Warehouse

    Hardy, M.A.; Leahy, P.P.; Alley, W.M.

    1989-01-01

    Several pilot projects are being conducted as part of the National Water Quality Assessment (NAWQA) Program. The purpose of the pilot program is to test and refine concepts for a proposed full-scale program. Three of the pilot projects are specifically designed to assess groundwater. The purpose of this report is to describe the criteria that are being used in the NAWQA pilot projects for selecting and documenting wells, installing new wells, and sampling wells for different water quality constituents. Guidelines are presented for the selection of wells for sampling. Information needed to accurately document each well includes site characteristics related to the location of the well, land use near the well, and important well construction features. These guidelines ensure the consistency of the information collected and will provide comparable data for interpretive purposes. Guidelines for the installation of wells are presented and include procedures that need to be followed for preparations prior to drilling, the selection of the drilling technique and casing type, the grouting procedure, and the well-development technique. A major component of the protocols is related to water quality sampling. Tasks are identified that need to be completed prior to visiting the site for sampling. Guidelines are presented for purging the well prior t sampling, both in terms of the volume of water pumped and the chemical stability of field parameters. Guidelines are presented concerning sampler selection as related to both inorganic and organic constituents. Documentation needed to describe the measurements and observations related to sampling each well and treating and preserving the samples are also presented. Procedures are presented for the storage and shipping of water samples, equipment cleaning, and quality assurance. Quality assurance guidelines include the description of the general distribution of the various quality assurance samples (blanks, spikes, duplicates, and reference samples) that will be used in the pilot program. (Lantz-PTT)

  1. THE INTEGRATION OF A PROPOSED ZONE CLOSURE APPROACH FOR THE PLUTONIUM FINISHING PLANT (PFP) DECOMMISSIONING & THE PFP ZONE HANFORD SITE WASHINGTON

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    HOPKINS, A.M.

    2005-02-23

    The Plutonium Finishing Plant (PFP) and associated processing facilities are located in the 200 area of the Hanford Site in Eastern Washington. This area is part of what is now called the Central Plateau. In order to achieve closure of the contaminated facilities and waste sites at Hanford on the Central Plateau (CP), a geographic re-districting of the area into zones has been proposed in the recently published Plan for Central Plateau Closure. One of the 22 zones proposed in the Central Plateau encompasses the PFP and ancillary facilities. Approximately eighty six buildings are included in the PFP Zone. Thismore » paper addresses the approach for the closure of the PFP Zone within the Central Plateau. The PFP complex of buildings forms the bulk of the structures in the PFP Zone. For closure of the above-grade portion of structures within the PFP complex, the approach is to remove them to a state called ''slab-on-grade'' per the criteria contained in PFP End Point Criteria document and as documented in action memoranda. For below-grade portions of the structures (such as below-grade rooms, pipe trenches and underground ducts), the approach is to remove as much residual contamination as practicable and to fill the void spaces with clean fill material such as sand, grout, or controlled density fill. This approach will be modified as planning for the waste sites progresses to ensure that the actions of the PFP decommissioning projects do not negatively impact future planned actions under the CERCLA. Cribs, settling tanks, septic tanks and other miscellaneous below-grade void spaces will either be cleaned to the extent practicable and filled or will be covered with an environmental barrier as determined by further studies and CERCLA decision documents. Currently, between two and five environmental barriers are proposed to be placed over waste sites and remaining building slabs in the PFP Zone.« less

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Van Hoy, Blake W

    The Spallation Neutron Source (SNS) at the Oak Ridge National Laboratory (ORNL) provides variable energy neutrons for a variety of experiments. The neutrons proceed down beam lines to the experiment hall, which houses a variety of experiments and test articles. Each beam line has one or more neutron choppers which filter the neutron beam based on the neutron energy by using a rotating neutron absorbing material passing through the neutron beam. Excessive vibration of the Vision beam line, believed to be caused by the T0 chopper, prevented the Vision beam line from operating at full capacity. This problem had beenmore » addressed several times by rebalancing/reworking the T0 beam chopper but the problem stubbornly persisted. To determine the cause of the high vibration, dynamic testing was performed. Twenty-seven accelerometer and motor current channels of data were collected during drive up, drive down, coast down, and steady-state conditions; resonance testing and motor current signature analysis were also performed. The data was analyzed for traditional mechanical/machinery issues such as misalignment and imbalance using time series analysis, frequency domain analysis, and operating deflection shape analysis. The analysis showed that the chopper base plate was experiencing an amplified response to the excitation provided by the T0 beam chopper. The amplified response was diagnosed to be caused by higher than expected base plate flexibility, possibly due to improper grouting or loose floor anchors. Based on this diagnosis, a decision was made to dismantle the beam line chopper and remount the base plate. Neutron activation of the beam line components make modifications to the beam line especially expensive and time consuming due to the radiation handling requirements, so this decision had significant financial and schedule implications. It was found that the base plate was indeed loose because of improper grouting during its initial installation. The base plate was modified by splitting it into multiple sections, isolating the T0 chopper from the rest of the beam line, and each section was then reinstalled and re-grouted. After these modifications, the vibration levels were reduced by a factor of 30. The reduction in vibration level was sufficient to allow the Vision beam line to operate at full capacity for the first time since its completed construction date.« less

  3. Seismological Discrimination and Yield Determination Research

    DTIC Science & Technology

    1980-02-01

    observed short period vertical seismograms for a * Rainier Mesa explosion ....... . .68 iv * LIST OF ILLUSTRATIONS (continued) Figure Page 33. Comparison... mounted on sides 2 and 4. All signals were recorded on a FM instrumenta- tion tape machine with response from dc to 80 kHz. All the charges in each grout...detail. (Probes * were mounted on an external support and held at a nominal 0.2 mm from the Al disks.) 81 SYSTEMS. SCIENCE’ AND SOFT WARE 5.3 RESULTS

  4. 2005 Tri-Service Infrastructure Systems Conference and Exhibition. Volume 7, Tracks 7 and 8

    DTIC Science & Technology

    2005-08-04

    dense soils have the potential to wash-out and erode with fluid rotary methods and over excavation and hydraulic fracturing can result. Short...circuiting is possible outside of the temporary or outer casing or through weak soils to grade. Hydraulic fracturing may take place due to soil properties...prevented the potential for hydraulic fracturing of the sensitive dam prior to grouting. Sonic drilling was selected from a ran of proposed

  5. Corrosion of post-tensioning strands in ungrouted ducts - unstressed condition

    NASA Astrophysics Data System (ADS)

    Hutchison, Michael

    Recent failures and severe corrosion distress of post-tensioned (PT) bridges in Florida have revealed corrosion of the 7-wire strands in tendons. Post-tensioned duct assemblies are fitted with multiple 7-wire steel strands and ducts are subsequently filled with grout. During construction, the length of time from the moment in which the strands have been inserted into the ducts, until the ducts are grouted, is referred to as the `ungrouted' period. During this phase, the steel strands are vulnerable to corrosion and consequently the length of this period is restricted (typically to 7 days) by construction guidelines. This investigation focuses on determining the extent of corrosion that may take place during that period, but limited to strands that were in the unstressed condition. Visual inspections and tensile testing were used to identify trends in corrosion development. Corrosion induced cracking mechanisms were also investigated via wire bending and metallographic cross section evaluation. Corrosion damage on unstressed strands during ungrouted periods of durations in the order of those otherwise currently prescribed did not appear to seriously degrade mechanical performance as measured by standardized tests. However the presence of stress in the ungrouted period, as is normally the case, may activate other mechanisms (e.g., EAC) that require further investigation. As expected in the unstressed condition, no evidence of transverse cracking was observed.

  6. Stress relaxation of grouted entirely large diameter B-GFRP soil nail

    NASA Astrophysics Data System (ADS)

    Li, Guo-wei; Ni, Chun; Pei, Hua-fu; Ge, Wan-ming; Ng, Charles Wang Wai

    2013-08-01

    One of the potential solutions to steel-corrosion-related problems is the usage of fiber reinforced polymer (FRP) as a replacement of steel bars. In the past few decades, researchers have conducted a large number of experimental and theoretical studies on the behavior of small size glass fiber reinforce polymer (GFRP) bars (diameter smaller than 20 mm). However, the behavior of large size GFRP bar is still not well understood. Particularly, few studies were conducted on the stress relaxation of grouted entirely large diameter GFRP soil nail. This paper investigates the effect of stress levels on the relaxation behavior of GFRP soil nail under sustained deformation ranging from 30% to 60% of its ultimate strain. In order to study the behavior of stress relaxation, two B-GFRP soil nail element specimens were developed and instrumented with fiber Bragg grating (FBG) strain sensors which were used to measure strains along the B-GFRP bars. The test results reveal that the behavior of stress relaxation of B-GFRP soil nail element subjected to pre-stress is significantly related to the elapsed time and the initial stress of relaxation procedure. The newly proposed model for evaluating stress relaxation ratio can substantially reflect the influences of the nature of B-GFRP bar and the property of grip body. The strain on the nail body can be redistributed automatically. Modulus reduction is not the single reason for the stress degradation.

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The purpose of this analysis is to provide information necessary for the Department of Energy (DOE) to evaluate the practical utility of the Nitrate to Ammonia and Ceramic or Glass (NAC/NAG/NAX) process, which is under development in the Oak Ridge National Laboratory. The NAC/NACx/NAX process can convert aqueous radioactive nitrate-laden waste to a glass, ceramic, or grout solid waste form. The tasks include, but are not limited to, the following: Identify current commercial technologies to meet hazardous and radiological waste disposal requirements. The technologies may be thermal or non-thermal but must be all inclusive (i.e., must convert a radionuclide-containing nitratemore » waste with a pH around 12 to a stable form that can be disposed at permitted facilities); evaluate and compare DOE-sponsored vitrification, grouting, and minimum additive waste stabilization projects for life-cycle costs; compare the technologies above with respect to material costs, capital equipment costs, operating costs, and operating efficiencies. For the NAC/NAG/NAX process, assume aluminum reactant is government furnished and ammonia gas may be marketed; compare the identified technologies with respect to frequency of use within DOE for environmental management applications with appropriate rationale for use; Assess the potential size of the DOE market for the NAC/NAG/NAX process; assess and off-gas issues; and compare with international technologies, including life-cycle estimates.« less

  8. A Novel Strategy for landslide displacement and its direction monitoring

    NASA Astrophysics Data System (ADS)

    Zhu, Z.-W.; Yuan, Q.-Y.; Liu, D.-Y.; Liu, B.; Liu, J.-C.; Luo, H.

    2013-12-01

    Landslide monitoring is important in predicting the behavior of landslides, thereby ensuring environmental, life, and property safety. On the basis of our previous studies, we conducted the double shear test by using a third-generation optical fiber transducer that uses expandable polystyrene (EPS) as base material. However, the third-generation transducer has poor performance when cohesive force is present between the grout and capillary stainless steel pipe of the transducer. Thus, the fourth-generation optical fiber transducer was invented. Similar to the third-generation transducer, the fourth-generation transducer also used EPS as its base material. Single shear test was conducted on the fourth-generation transducer after being grouted with cement mortar (1:1 mix ratio). The micro-bend loss mechanism of the optical fiber was considered, and the optical time domain reflectometry instrument was used. The fact that the loss sequence of optical fibers subjected to loading is different at various locations is found. The relationship of the loading-point displacement VS. optical fiber sliding distance and optical loss were measured. Results show that the maximum initial measurement precision of the newly proposed device is 1mm, the corresponding sliding distance is 21 mm, and the dynamic range is 0-20 mm. The fourth-generation transducer can measure the movement direction of loadings, thus making this transducer applicable for landslide monitoring.

  9. New improvement of the combined optical fiber transducer for landslide monitoring

    NASA Astrophysics Data System (ADS)

    Zhu, Z.-W.; Yuan, Q.-Y.; Liu, D.-Y.; Liu, B.; Liu, J.-C.; Luo, H.

    2014-08-01

    Landslide monitoring is important in predicting the behavior of landslides, thereby ensuring environmental, life, and property safety. On the basis of our previous studies, we conducted the double shear test by using a third-generation optical fiber transducer that uses expandable polystyrene (EPS) as base material. However, the third-generation transducer has poor performance when cohesive force is present between the grout and capillary stainless steel pipe of the transducer. Thus, the fourth-generation optical fiber transducer was invented. Similar to the third-generation transducer, the fourth-generation transducer also used EPS as its base material. Single shear test was conducted on the fourth-generation transducer after being grouted with cement mortar (1 : 1 mix ratio). The micro-bend loss mechanism of the optical fiber was considered, and the optical time domain reflectometry instrument was used. The fact that the loss sequence of optical fibers subjected to loading is different at various locations is found. The relationship of the loading-point displacement vs. optical fiber sliding distance and optical loss were measured. Results show that the maximum initial measurement precision of the newly proposed device is 1 mm, the corresponding sliding distance is 21 mm, and the dynamic range is 0-20 mm. The fourth-generation transducer can measure the movement direction of loadings, thus making this transducer applicable for landslide monitoring.

  10. Analysis of Causes of Uplift Anomalies in the Čierny Váh Subsoil

    NASA Astrophysics Data System (ADS)

    Bednárová, Emília; Grambličková, Danka; Škvarka, Juraj; Majerčák, Vlastimil; Slávik, Ivan

    2017-12-01

    The pumped storage hydropower plant of Čierny Váh was created by means of damming up the valley of the Čierny Váh River. The dam is 18.5 m high above terrain and 375 m long in the dam’s crest. Total capacity of the reservoir is 5.1 million m3. Complicated geological conditions in the subsoil of dam’s body - fractured dolomite with local occurrence of tectonic breccia and clays, with the occurrence of intense disturbances - called for the construction of the grouting curtain in the dam’s subsoil. Its depth is about 20 in the area of the riverine plain, and about 60 m in the areas of abutments. During foregoing operations of the structure, more than 30 years, local anomalies in the uplift development in the right abutment’s subsoil of the lower reservoir dam were recorded. Their abnormally high values on the downstream side of grouting curtain have become the subject of extensive discussion and a stimulus for its remediation. To ensure reliable operation of the hydraulic structure a comprehensive analysis of the impact of the long-term operation of the reservoir on the dam safety was carried out. This included an examination of the causes of anomalous development of uplifts using FEM numerical modelling. The paper presents obtained results from this analysis.

  11. Development of an Ultra-Light Multipurpose Drill and Tooling for the Transportable Array in Alaska

    NASA Astrophysics Data System (ADS)

    Coyle, B. J.; Lundgren, M.; Busby, R. W.

    2014-12-01

    Over the next four years the EarthScope Transportable Array (TA) will install approximately 250 to 275 broadband seismic stations in Alaska and Western Canada. The station plans build on recent developments in posthole broadband seismometer design and call for sensors to be installed in boreholes 7 inches diameter, from 1 to 5 meters deep. These boreholes will be lined with PVC or steel casing, grouted in place. The proposed station locations are in a grid-like pattern with a nominal spacing of 85 km. Since most of these locations will only be accessible by helicopter, it was necessary to develop an ultra-light drilling system that could be transported to site in one sling load by a high performance light helicopter (i.e. AS350B2 or Bell 407) and still be able to drill the variety of ground conditions we expect to encounter. In the past year we have developed a working prototype, gasoline-hydraulic drill rig that can be configured to run auger, diamond core or DTH tools, and weighs <1,300 lbs, including tooling. We have successfully drilled over 30 boreholes with this drill, including 12 for TA installations in Alaska and 13 at the Piñon Flat Observatory for testing sensor performance and placement techniques. Our drilling solution comprises: - Hydraulic system using a variable flow pump with on-demand load sensing valves to reduce the engine size needed and to cut down on heat build-up; - Rotation head mounting system on the travelling block to enable quick change of drilling tools; - Low speed, high torque rotation head for the auger, and an anchoring system that enables us to apply up to 5,000 lbs downforce for augering in permafrost; - Custom DTH that can run on low air pressure and air flow, yet is still robust enough to drill a 7 inch hole 2.5 meters through solid rock; - One-trip casing advance drilling with the DTH, steel casing is loaded at the start of drilling and follows the drill bit down; - Grout-through bottom caps for sealing the borehole casing and cementing it in place. Our next step is to build a dedicated DTH drilling system that will be light enough to mobilize to sites in one helicopter sling, including an air compressor. This rig is currently on the drawing board and we expect to build it this winter for field testing in the spring.

  12. Deep Charging Evaluation of Satellite Power and Communication System Components

    NASA Technical Reports Server (NTRS)

    Schneider, T. A.; Vaughn, J. A.; Chu, B.; Wong, F.; Gardiner, G.; Wright, K. H.; Phillips, B.

    2016-01-01

    Deep charging, in contrast to surface charging, focuses on electron penetration deep into insulating materials applied over conductors. A classic example of this scenario is an insulated wire. Deep charging can pose a threat to material integrity, and to sensitive electronics, when it gives rise to an electrostatic discharge or arc. With the advent of Electric Orbit Raising, which requires spiraling through Earth's radiation belts, satellites are subjected to high energy electron environments which they normally would not encounter. Beyond Earth orbit, missions to Jupiter and Saturn face deep charging concerns due to the high energy radiation environments. While predictions can be made about charging in insulating materials, it is difficult to extend those predictions to complicated geometries, such as the case of an insulating coating around a small wire, or a non-uniform silicone grouting on a bus bar. Therefore, to conclusively determine the susceptibility of a system to arcs from deep charging, experimental investigations must be carried out. This paper will describe the evaluation carried out by NASA's Marshall Space Flight Center on subscale flight-like samples developed by Space Systems/Loral, LLC. Specifically, deep charging evaluations of solar array wire coupons, a photovoltaic cell coupon, and a coaxial microwave transmission cable, will be discussed. The results of each evaluation will be benchmarked against control sample tests, as well as typical power system levels, to show no significant deep charging threat existed for this set of samples under the conditions tested.

  13. MEASUREMENT OF WASTE LOADING IN SALTSTONE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harbour, J; Vickie Williams, V

    2008-07-18

    One of the goals of the Saltstone variability study is to identify the operational and compositional variables that control or influence the important processing and performance properties of Saltstone grout mixtures. One of those properties of importance is the Waste Loading (WL) of the decontaminated salt solution (DSS) in the Saltstone waste form. Waste loading is a measure of the amount of waste that can be incorporated within a waste form. The value of the Saltstone waste loading ultimately determines the number of vaults that will be required to disposition all of the DSS. In this report, the waste loadingmore » is defined as the volume in milliliters of DSS per liter of Saltstone waste form. The two most important parameters that determine waste loading for Saltstone are water to cementitious material (w/cm) ratio and the cured grout density. Data are provided that show the dependence of waste loading on the w/cm ratio for a fixed DSS composition using the current premix material (45% Blast Furnace Slag (BFS), 45% Fly Ash (FA) and 10% Ordinary Portland Cement (OPC)). The impact of cured grout density on waste loading was also demonstrated. Mixes (at 0.60 w/cm) made with a Modular Caustic side extraction Unit (MCU) simulant and either OPC or BFS have higher cured grout densities than mixes made with premix and increase the WL to 709 mL/L for the OPC mix and 689 mL/L for the BFS mix versus the value of 653 mL/L for MCU in premix at 0.60 w/cm ratio. Bleed liquid reduces the waste loading and lowers the effective w/cm ratio of Saltstone. A method is presented (and will be used in future tasks) for correcting the waste loading and the w/cm ratio of the as-batched mixes in those cases where bleed liquid is present. For example, the Deliquification, Dissolution and Adjustment (DDA) mix at an as-batched 0.60 w/cm ratio, when corrected for % bleed, gives a mix with a 0.55 w/cm ratio and a WL that has been reduced from 662 to 625 mL/L. An example is provided that demonstrated the quantitative impact of WL on the number of cells (each Saltstone vault contains two cells) required to disposition all of the {approx}100 million gallons of DSS available in the tanks. This calculation revealed that the number of cells required over the range of 0.48 to 0.62 w/cm ratio (equivalent to a WL range of 591 to 666 mL/L) varies from 65 to 57 cells (33 to 29 vaults). The intent of this oversimplified example was to show the range of variation in vaults expected due to w/cm ratio rather than to estimate the actual number of vaults required. There is a tradeoff between the waste loading and the processing and performance properties of Saltstone. The performance properties improve in general as the w/cm ratio decreases whereas the waste loading is reduced at lower w/cm ratios resulting in a larger number of Saltstone vaults. The final performance and processing requirements of Saltstone will determine the maximum waste loading achievable.« less

  14. Installation Restoration Program Phase 2. Confirmation/Quantification. Stage 1. Volume 1.

    DTIC Science & Technology

    1986-10-10

    FIGUR 1- EEA LNO EFIG I AiNLanfl GUARD BASESHOWING PHSE II INVTIGTOIE I 1- ........ Site No. - I MAA Site No.Northwest Landfill TS Site.No.4 West...Protective Steel PVC Cap Flush Mount in Casing Plastic Nelson Valve Box Land Surface PVC Cap . Cement Grout 0 L n aBentonite Pellet 4" Diameter Seal...12.0 feet BLS. Clays of high plasticity predominate in all three wells. No sand lenses were encountered and the topsoil at all three well locations is

  15. Evaluation of Sealing Materials and Techniques for Installing Quoin and Miter Block Backing Grout

    DTIC Science & Technology

    2015-11-01

    being used effectively in the field. The materials currently in use have low viscosities and are typically poured behind the quoin and miter blocks in...tively in the field. The materials now used have low viscosities . They are typ- ically poured behind the quoin and miter blocks in lifts. The perimeter of...colder temperatures. Low viscosity at warmer temperatures. Hilti HIT ICE Epoxy Acrylate It is primarily a cold weather product that had poor

  16. Implementation Document for Other Contamination Sources Interim Response Action shell Section 36 Trenches, RMA. Volume 1. General

    DTIC Science & Technology

    1990-12-01

    rights and obligations of theA Army as L.aaa Aqency-or Shall as Leand Party under any law or the Federai. Fact..ity (g) Unless otherwise provided in a...Exposure occurs principally during manufacture or during bulk handling activities. Since it is generally injected into the soil at depths of 15 to 30 cm...Slurry Mix Design: The design of the IMPERMIX grouting mix, which shall meet all requirements of the Impermix manufacturer . G. Quality Control Testing

  17. Investigation of Sand-Cement Grouts

    DTIC Science & Technology

    1960-09-01

    I -IEN NO Isis Table 1 InvestiiatLon of Sand-Cement Crouts Data on Lhe Physical Properties of the inely Divided Mineral Admixt)res Blaine Specific...Itoi, tuicrlt.nel, Caiftrnia; fl1; aish, Illinois; ;1iaricito, California; Lo’ss, Yisniasi~pi; bentornitoe, Wy~caing. Physical drnta for the raateriais...increase i’: tne a.cunt of .anj th-?t coul be puiped. As the diatomite had a specific ,i’face about 1C tines that of the loe33, it would appear that this

  18. Laboratory Studies of Containment in Underground Nuclear Tests.

    DTIC Science & Technology

    1980-01-31

    and filling the space between charge holder and tube with epoxy. The access tube is filled with epoxy. Vel t iug occurs when tile tube is drilled out...membrane is then stretched over the eud of the access tube and held in place by means of a Teflon ferrule and epoxy sa I . Tile membrane is filled with...electrically conductive silver -based paint. Two copper tabs are first embedded in the surface of the sphere during cast ing. After the grout is cured, the paint

  19. Neural network based inspection of voids and karst conduits in hydro-electric power station tunnels using GPR

    NASA Astrophysics Data System (ADS)

    Kilic, Gokhan; Eren, Levent

    2018-04-01

    This paper reports on the fundamental role played by Ground Penetrating Radar (GPR), alongside advanced processing and presentation methods, during the tunnel boring project at a Dam and Hydro-Electric Power Station. It identifies from collected GPR data such issues as incomplete grouting and the presence of karst conduits and voids and provides full details of the procedures adopted. In particular, the application of collected GPR data to the Neural Network (NN) method is discussed.

  20. Center for Coal-Derived Low Energy Materials for Sustainable Construction

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jewell, Robert; Robl, Tom; Rathbone, Robert

    2012-06-30

    The overarching goal of this project was to create a sustained center to support the continued development of new products and industries that manufacture construction materials from coal combustion by-products or CCB’s (e.g., cements, grouts, wallboard, masonry block, fillers, roofing materials, etc). Specific objectives includes the development of a research kiln and associated system and the formulation and production of high performance low-energy, low-CO2 emitting calcium sulfoaluminate (CAS) cement that utilize coal combustion byproducts as raw materials.

  1. Conceptual design statement of work for the immobilized low-activity waste interim storage facility project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carlson, T.A., Fluor Daniel Hanford

    1997-02-06

    The Immobilized Low-Activity Waste Interim Storage subproject will provide storage capacity for immobilized low-activity waste product sold to the U.S. Department of Energy by the privatization contractor. This statement of work describes the work scope (encompassing definition of new installations and retrofit modifications to four existing grout vaults), to be performed by the Architect-Engineer, in preparation of a conceptual design for the Immobilized Low-Activity Waste Interim Storage Facility.

  2. High Level Synthesis in ASP

    DTIC Science & Technology

    1986-08-19

    Thus in and g (X, Y) A and X share one element, and B and Y share another. Assigning a value to A (via its storage element) also assigns that value to X...functionality as well as generate it. i4 29 References [Ada] ’ADA as a Hardware Description Language: An Initial Report’ M.R. Bar- bacci, S. Grout, G ...1985; pp. 303-320. (Expert] ’An Expert-System Paradigm for Design’ Forrest D. Brewer, Daniel D. Gajski ; 23rd Design Automation Conference, 1986; pp

  3. 7 CFR 43.104 - Master table of single and double sampling plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 2 2012-01-01 2012-01-01 false Master table of single and double sampling plans. 43... STANDARD CONTAINER REGULATIONS STANDARDS FOR SAMPLING PLANS Sampling Plans § 43.104 Master table of single and double sampling plans. (a) In the master table, a sampling plan is selected by first determining...

  4. 7 CFR 43.104 - Master table of single and double sampling plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 2 2013-01-01 2013-01-01 false Master table of single and double sampling plans. 43... STANDARD CONTAINER REGULATIONS STANDARDS FOR SAMPLING PLANS Sampling Plans § 43.104 Master table of single and double sampling plans. (a) In the master table, a sampling plan is selected by first determining...

  5. 7 CFR 43.104 - Master table of single and double sampling plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 2 2014-01-01 2014-01-01 false Master table of single and double sampling plans. 43... STANDARD CONTAINER REGULATIONS STANDARDS FOR SAMPLING PLANS Sampling Plans § 43.104 Master table of single and double sampling plans. (a) In the master table, a sampling plan is selected by first determining...

  6. 7 CFR 43.104 - Master table of single and double sampling plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 2 2011-01-01 2011-01-01 false Master table of single and double sampling plans. 43... STANDARD CONTAINER REGULATIONS STANDARDS FOR SAMPLING PLANS Sampling Plans § 43.104 Master table of single and double sampling plans. (a) In the master table, a sampling plan is selected by first determining...

  7. EVALUATION OF THE DURABILITY OF THE STRUCTURAL CONCRETE OF REACTOR BUILDINGS AT SRS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Duncan, A.; Reigel, M.

    2011-02-28

    The Department of Energy (DOE) intends to close 100-150 facilities in the DOE complex using an in situ decommissioning (ISD) strategy that calls for grouting the below-grade interior volume of the structure and leaving the above-grade interior open or demolishing it and disposing of it in the slit trenches in E Area. These closures are expected to persist and remain stable for centuries, but there are neither facility-specific monitoring approaches nor studies on the rate of deterioration of the materials used in the original construction or on the ISD components added during closure (caps, sloped roofs, etc). This report willmore » focus on the evaluation of the actual aging/degradation of the materials of construction used in the ISD structures at Savannah River Site (SRS) above grade, specifically P & R reactor buildings. Concrete blocks (six 2 to 5 ton blocks) removed from the outer wall of the P Reactor Building were turned over to SRNL as the first source for concrete cores. Larger cores were received as a result of grouting activities in P and R reactor facilities. The cores were sectioned and evaluated using microscopy, x-ray diffraction (XRD), ion chromatography (IC) and thermal analysis. Scanning electron microscopy shows that the aggregate and cement phases present in the concrete are consistent with the mix design and no degradation mechanisms are evident at the aggregate-cement interfaces. Samples of the cores were digested and analyzed for chloride ingress as well as sulfate attack. The concentrations of chloride and sulfate ions did not exceed the limits of the mix design and there is no indication of any degradation due to these mechanisms. Thermal analysis on samples taken along the longitudinal axis of the cores show that there is a 1 inch carbonation layer (i.e., no portlandite) present in the interior wall of the reactor building and a negligible carbonation layer in the exterior wall. A mixed layer of carbonate and portlandite extends deeper into the interior (2-3 inches) and exterior (1-2 inches) walls. This is more extensive than measured in previous SRS structures. Once the completely carbonated layer reaches the rebar that is approximately 2-3 inches into the concrete wall, the steel is susceptible to corrosion. The growth rate of the carbonated layer was estimated from current observations and previous studies. Based on the estimated carbonation rate, the steel rebar should be protected from carbonation induced corrosion for at least another 100 years. If degradation of these structures is dominated by the carbonation mechanism, the length of time before water intrusion is expected into the process room of P-reactor is estimated to be between 425-675 years.« less

  8. Bacteriological quality of ground water used for household supply, Lower Susquehanna River basin, Pennsylvania and Maryland

    USGS Publications Warehouse

    Bickford, Tammy M.; Lindsey, Bruce D.; Beaver, M.R.

    1996-01-01

    This report describes the bacteriological results of a ground-water study conducted from 1993 to 1995 as part of the U.S. Geological Survey's National Water-Quality Assessment Program in the Lower Susquehanna River Basin study unit. Water samples collected from 146 household supply wells were analyzed for fecal-indicator organisms including total coliform, fecal coliform, Escherichia coli (E. coli), and fecal streptococcus concentrations. Supporting data used in the interpretations are selected water-quality constituents, well-construction information, and the environmental setting at the well site including land use, physiography, and bedrock type. Water from nearly 70 percent of the wells sampled had total coliform present and thus was not suitable for drinking without treatment. Fecal coliforms were found in water from approximately 25 percent of the sampled wells. E. coli testing was not conducted in 1993. Approximately 30 percent of the 88 sampled wells had waters with E. coli. Fecal streptococcus bacteria was present in water from about 65 percent of the wells sampled. Bacteriological contamination was more likely to occur in water from wells in agricultural areas than in water from wells in forested areas. Water from wells sampled in the Ridge and Valley Physiographic Province was more likely to have bacteria than water from wells in the Piedmont Physiographic Province. Differences in bacterial concentrations among bedrock types are only statistically significant for E. coli. Bacterial concentrations are weakly related to well-age but not to other well characteristics such as the total well depth or the casing length. Relations exist between bacterial concentrations and selected water-quality constituents. Most wells from which water was sampled did not have sanitary seals and very few were grouted. This may have contributed to the number of detections of bacteria. It is uncertain whether the bacteria detected are the result of widespread aquifer contamination or site-specific factors.

  9. Alternative sample sizes for verification dose experiments and dose audits

    NASA Astrophysics Data System (ADS)

    Taylor, W. A.; Hansen, J. M.

    1999-01-01

    ISO 11137 (1995), "Sterilization of Health Care Products—Requirements for Validation and Routine Control—Radiation Sterilization", provides sampling plans for performing initial verification dose experiments and quarterly dose audits. Alternative sampling plans are presented which provide equivalent protection. These sampling plans can significantly reduce the cost of testing. These alternative sampling plans have been included in a draft ISO Technical Report (type 2). This paper examines the rational behind the proposed alternative sampling plans. The protection provided by the current verification and audit sampling plans is first examined. Then methods for identifying equivalent plans are highlighted. Finally, methods for comparing the cost associated with the different plans are provided. This paper includes additional guidance for selecting between the original and alternative sampling plans not included in the technical report.

  10. Road Maintenance Experience Using Polyurethane (PU) Foam Injection System and Geocrete Soil Stabilization as Ground Rehabilitation

    NASA Astrophysics Data System (ADS)

    Fakhar, A. M. M.; Asmaniza, A.

    2016-07-01

    There are many types of ground rehabilation and improvement that can be consider and implement in engineering construction works for soil improvement in order to prevent road profile deformation in later stage. However, when comes to road maintenance especially on operated expressways, not all method can be apply directly as it must comply to opreation's working window and lane closure basis. Key factors that considering ideal proposal for ground rehabilitation are time, cost, quality and most importantly practicality. It should provide long lifespan structure in order to reduce continuous cycle of maintenance. Thus, this paper will present two approaches for ground rehabilitation, namely Polyurethane (PU) Foam Injection System and Geocrete Soil Stabilization. The first approach is an injection system which consists two-parts chemical grout of Isocynate and Polyol when mixed together within soil structure through injection will polymerized with volume expansion. The strong expansion of grouting causes significant compression and compacting of the surrounding soil and subsequently improve ground properties and uplift sunken structure. The later is a cold in-place recyclying whereby mixture process that combines in-situ soil materials, cement, white powder (alkaline) additive and water to produce hard yet flexible and durable ground layer that act as solid foundation with improved bearing capacity. The improvement of the mechanical behaviour of soil through these two systems is investigated by an extensive testing programme which includes in-situ and laboratory test in determining properties such as strength, stiffness, compressibility, bearing capacity, differential settlement and etc.

  11. Update on slip and wear in multi-layer azimuth track systems

    NASA Astrophysics Data System (ADS)

    Juneja, Gunjeet; Kan, Frank W.; Antebi, Joseph

    2006-06-01

    Many antennas, such as the 100-m Green Bank Telescope, use a wheel-on-track systems in which the track segments consist of wear plates mounted on base plates. The wear plates are typically 2 to 3 inches thick and are case hardened or through hardened. The base plates are usually 3 to 4 times thicker than the wear plates and are not hardened. The wear plates are typically connected to the base plates using bolts. The base plates are supported on grout and anchored to the underlying concrete foundation. For some antennas, slip has been observed between the wear plate and base plate, and between the base plate and the grout, with the migration in the wheel rolling direction. In addition, there has been wear at the wear plate/base plate interface. This paper is an update on the evaluation of GBT track retrofit. The paper describes the use of three-dimensional non-linear finite element analyses to understand and evaluate the behavior of (1) the existing GBT wheel-on-track system with mitered joints, and (2) the various proposed modifications. The modifications include welding of the base plate joints, staggering of the wear plate joints from the base plate joints, changing thickness of the wear plate, and increasing bolt diameter and length. Parameters included in the evaluation were contact pressure, relative slip, wear at the wear plate/base plate interface, and bolt shears and moments.

  12. One-dimensional Spatial Distributions of Gamma-ray Emitting Contaminants in Field Lysimeters Using a Collimated Gamma-ray Spectroscopy System.

    PubMed

    Erdmann, Bryan J; Powell, Brian A; Kaplan, Daniel I; DeVol, Timothy A

    2018-05-01

    One-dimensional scans of gamma-ray emitting contaminants were conducted on lysimeters from the RadFLEX facility at the Savannah River Nationals Laboratory (SRNL). The lysimeters each contained a contamination source that was buried in SRNL soil. A source consisted of Cs, Co, Ba, and Eu incorporated either into a solid waste form (Portland cement and reducing grout) or applied to a filter paper for direct soil exposure. The lysimeters were exposed to natural environmental conditions for 3 to 4 y. The initial contaminant activities range from 4.0 to 9.0 MBq for the solid wasteforms and 0.25 to 0.47 MBq for the soil-incorporated source. The measurements were performed using a collimated high-purity germanium gamma-ray spectrometer with a spatial resolution of 2.5 mm. These scans showed downward mobility of Co and Ba when the radionuclides were incorporated directly into the SRNL soil. When radionuclides were incorporated into the solid waste forms positioned in the SRNL soil, Cs exhibited both upward and downward dispersion while the other radionuclides showed no movement. This dispersion was more significant for the Portland cement than the reducing grout wasteform. Europium-152 was the only radionuclide of those studied that showed no movement within the spatial resolution of the scanner from the original placement within the lysimeter. Understanding radionuclide movement in the environment is important for developing strategies for waste management and disposal.

  13. Comparison of chain sampling plans with single and double sampling plans

    NASA Technical Reports Server (NTRS)

    Stephens, K. S.; Dodge, H. F.

    1976-01-01

    The efficiency of chain sampling is examined through matching of operating characteristics (OC) curves of chain sampling plans (ChSP) with single and double sampling plans. In particular, the operating characteristics of some ChSP-0, 3 and 1, 3 as well as ChSP-0, 4 and 1, 4 are presented, where the number pairs represent the first and the second cumulative acceptance numbers. The fact that the ChSP procedure uses cumulative results from two or more samples and that the parameters can be varied to produce a wide variety of operating characteristics raises the question whether it may be possible for such plans to provide a given protection with less inspection than with single or double sampling plans. The operating ratio values reported illustrate the possibilities of matching single and double sampling plans with ChSP. It is shown that chain sampling plans provide improved efficiency over single and double sampling plans having substantially the same operating characteristics.

  14. Cost estimation for slope stability improvement in Muara Enim

    NASA Astrophysics Data System (ADS)

    Juliantina, Ika; Sutejo, Yulindasari; Adhitya, Bimo Brata; Sari, Nurul Permata; Kurniawan, Reffanda

    2017-11-01

    Case study area of SP. Sugihwaras-Baturaja is typologically specified in the C-zone type because the area is included in the foot of the mountain with a slope of 0 % to 20 %. Generally, the factors that cause landslide in Muara Enim Regency due to the influence of soil/rock, water factor, geological factors, and human activities. Slope improvement on KM.273 + 642-KM.273 + 774 along 132 m using soil nailing with 19 mm diameter tendon iron and an angle of 20o and a 75 mm shotcrete thickness, a K-250 concrete grouting material. Cost modeling (y) soil nailing based on 4 variables are X1 = length, X2 = horizontal distance, X3 = safety factor (SF), and X4 = time. Nine variations were used as multiple linear regression equations and analyzed with SPSS.16.0 program. Based on the SPSS output, then attempt the classical assumption and feasibility test model which produced the model that is Cost = (1,512,062 + 194,354 length-1,649,135 distance + 187,831 SF + 54,864 time) million Rupiah. The budget plan includes preparatory work, drainage system, soil nailing, and shotcrete. An efficient cost estimate of 8 m length nail, 1.5 m installation distance, safety factor (SF) = 1.742 and a 30 day processing time resulted in a fee of Rp. 2,566,313,000.00 (Two billion five hundred sixty six million three hundred thirteen thousand rupiah).

  15. The negative effect of environmental geological conditions of some geo-archaeological sites of North Coast and Alexandria

    NASA Astrophysics Data System (ADS)

    Ibrahim, Hani; Kamh, Gamal

    2005-12-01

    Three geo-archaeological sites at the North Coast and Alexandria, namely, the Alexandria wall (El Shalalat Park site), Abu Soir temple, and Marina excavations, were investigated to determine the negative impact of a salty environmental condition. The monuments suffer from rock decay of different rates. The geo-archaeological sites were built mainly from oolitic limestone blocks (i.e., the Alexandria wall at the El Shalalat Park site and Abu Soir temple) or excavated on them (i.e., Marina excavations). Field inspection and a lab analysis were carried out to understand the weathering mechanism. Salt weathering criteria such as disintegration, pitting, scaling, exfoliation, and honeycomb are observed on the Alexandria wall and upper parts of the Abu Soir temple, while dangerous cracks are detected on the Marina excavation tombs. The petrographic study of the oolitic limestone samples shows that they consist mainly of oolities and drusy sparite as a cement (oolitic grainstone). Some oolities have quartz grains as nuclei. Hydrochemical analysis shows that the total dissolved salts of extracted solutions of the North Coast quarry samples range from 539 to 686 ppm and dramatically increase (i.e., ten times) for extracted solutions from monument samples, ranging from 5395 to 6880 ppm. The dominant cation is sodium while the dominant anion is chlorine. Acid insoluble residue analysis shows that the carbonate content ranges from 89.2% to 96.4% for fresh samples from quarries and from 9.2% to 94.8% for weathered monument samples. The weight loss of the quarry oolitic limestone samples range from 30.7% to 32.7% and its physical and mechanical properties become worse after being subjected to 15 cycles of a durability simulation soundness test (using a sodium sulphate solution). Our main recommendations are to use suitable grouting for binding the cracks, high durability reconstruction rocks, and suitable cleaning methods to remove salts from the monuments.

  16. The Use of Buoyancy to Lift Heavy Objects from the Sea.

    DTIC Science & Technology

    1981-06-01

    thoroughly piled and grouted to the ocean floor. These piles must be cut below -12- the mud line with explosive charges or diver air arc. Either way the pile...been considered. Re-use involves severing the jacket from the seabed, rotating the jacket to the horizontal and lifting it through the air / sea...stability on retraction through the air / sea interface. Accu -’i "l -- - F 1e. 4 i s - DD Forvu 1473 UNCIJAS 1Jak 3 O P’w$P~tkeDl 69CNIV C&W I

  17. Study on goaf gas control technology of gob-side entry driving

    NASA Astrophysics Data System (ADS)

    Ren, Qihan; Yuan, Benqing; Li, Qiansi

    2018-01-01

    The 1112 (1) track gate roadway of Gu Qiao coal mine of Huainan mining group adopt the method of gob-side entry driving, the gas emission is large during the driving of the roadway, the gas in the goaf seriously influences the safe driving of the roadway. Equalizing method, drilling drainage method, jet grouting method and other goaf gas controlling measures has been adopted. Finally, it effectively solves the safety threat of gas in goaf to roadway driving, it provides a good reference for the gas control of the gob-side entry.

  18. National Dam Safety Program. Moon Valley Dam (MO 11597), Missouri - Kansas City Basin, Boone County, Missouri. Phase I Inspection Report.

    DTIC Science & Technology

    1981-08-01

    Design 6 2.2 Construction 6 2.3 Operation 6 2.4 Geology 6 2.5 Evaluation 6 SECTION 3 - VISUAL INSPECTION 3.1 Findings 7 3.2 Evaluation 9 SECTION 4...Downstream of Dam 9 Erosion Behind East Wingwall 10 Erosion and Debris Behind West Wingwall 11 Diagonal Crack in East Wingwall 12 West Wingwall...2.0 H to approximately 1.0 V on 6.0 H. (6) Zoning - Unknown. (7) Impervious core - Unknown. (8) Cutoff - Unknown. ( 9 ) Grout curtain - Unknown. h

  19. 40 CFR 141.802 - Coliform sampling plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 23 2011-07-01 2011-07-01 false Coliform sampling plan. 141.802... sampling plan. (a) Each air carrier under this subpart must develop a coliform sampling plan covering each... required actions, including repeat and follow-up sampling, corrective action, and notification of...

  20. 40 CFR 141.802 - Coliform sampling plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Coliform sampling plan. 141.802... sampling plan. (a) Each air carrier under this subpart must develop a coliform sampling plan covering each... required actions, including repeat and follow-up sampling, corrective action, and notification of...

  1. Designing a multiple dependent state sampling plan based on the coefficient of variation.

    PubMed

    Yan, Aijun; Liu, Sanyang; Dong, Xiaojuan

    2016-01-01

    A multiple dependent state (MDS) sampling plan is developed based on the coefficient of variation of the quality characteristic which follows a normal distribution with unknown mean and variance. The optimal plan parameters of the proposed plan are solved by a nonlinear optimization model, which satisfies the given producer's risk and consumer's risk at the same time and minimizes the sample size required for inspection. The advantages of the proposed MDS sampling plan over the existing single sampling plan are discussed. Finally an example is given to illustrate the proposed plan.

  2. 7 CFR 42.104 - Sampling plans and defects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 2 2010-01-01 2010-01-01 false Sampling plans and defects. 42.104 Section 42.104... REGULATIONS STANDARDS FOR CONDITION OF FOOD CONTAINERS Procedures for Stationary Lot Sampling and Inspection § 42.104 Sampling plans and defects. (a) Sampling plans. Sections 42.109 through 42.111 show the number...

  3. 7 CFR 42.104 - Sampling plans and defects.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 2 2011-01-01 2011-01-01 false Sampling plans and defects. 42.104 Section 42.104... REGULATIONS STANDARDS FOR CONDITION OF FOOD CONTAINERS Procedures for Stationary Lot Sampling and Inspection § 42.104 Sampling plans and defects. (a) Sampling plans. Sections 42.109 through 42.111 show the number...

  4. 7 CFR 275.11 - Sampling.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Sampling. 275.11 Section 275.11 Agriculture... § 275.11 Sampling. (a) Sampling plan. Each State agency shall develop a quality control sampling plan which demonstrates the integrity of its sampling procedures. (1) Content. The sampling plan shall...

  5. 7 CFR 275.11 - Sampling.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Sampling. 275.11 Section 275.11 Agriculture... § 275.11 Sampling. (a) Sampling plan. Each State agency shall develop a quality control sampling plan which demonstrates the integrity of its sampling procedures. (1) Content. The sampling plan shall...

  6. Development of a Unified Rock Bolt Model in Discontinuous Deformation Analysis

    NASA Astrophysics Data System (ADS)

    He, L.; An, X. M.; Zhao, X. B.; Zhao, Z. Y.; Zhao, J.

    2018-03-01

    In this paper, a unified rock bolt model is proposed and incorporated into the two-dimensional discontinuous deformation analysis. In the model, the bolt shank is discretized into a finite number of (modified) Euler-Bernoulli beam elements with the degrees of freedom represented at the end nodes, while the face plate is treated as solid blocks. The rock mass and the bolt shank deform independently, but interact with each other through a few anchored points. The interactions between the rock mass and the face plate are handled via general contact algorithm. Different types of rock bolts (e.g., Expansion Shell, fully grouted rebar, Split Set, cone bolt, Roofex, Garford and D-bolt) can be realized by specifying the corresponding constitutive model for the tangential behavior of the anchored points. Four failure modes, namely tensile failure and shear failure of the bolt shank, debonding along the bolt/rock interface and loss of the face plate, are available in the analysis procedure. The performance of a typical conventional rock bolt (fully grouted rebar) and a typical energy-absorbing rock bolt (D-bolt) under the scenarios of suspending loosened blocks and rock dilation is investigated using the proposed model. The reliability of the proposed model is verified by comparing the simulation results with theoretical predictions and experimental observations. The proposed model could be used to reveal the mechanism of each type of rock bolt in realistic scenarios and to provide a numerical way for presenting the detailed profile about the behavior of bolts, in particular at intermediate loading stages.

  7. Updated Liquid Secondary Waste Grout Formulation and Preliminary Waste Form Qualification

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Saslow, Sarah A.; Um, Wooyong; Russell, Renee L.

    This report describes the results from liquid secondary waste grout (LSWG) formulation and cementitious waste form qualification tests performed by Pacific Northwest National Laboratory (PNNL) for Washington River Protection Solutions, LLC (WRPS). New formulations for preparing a cementitious waste form from a high-sulfate liquid secondary waste stream simulant, developed for Effluent Management Facility (EMF) process condensates merged with low activity waste (LAW) caustic scrubber, and the release of key constituents (e.g. 99Tc and 129I) from these monoliths were evaluated. This work supports a technology development program to address the technology needs for Hanford Site Effluent Treatment Facility (ETF) liquid secondarymore » waste (LSW) solidification and supports future Direct Feed Low-Activity Waste (DFLAW) operations. High-priority activities included simulant development, LSWG formulation, and waste form qualification. The work contained within this report relates to waste form development and testing and does not directly support the 2017 integrated disposal facility (IDF) performance assessment (PA). However, this work contains valuable information for use in PA maintenance past FY17, and for future waste form development efforts. The provided data should be used by (i) cementitious waste form scientists to further understanding of cementitious dissolution behavior, (ii) IDF PA modelers who use quantified constituent leachability, effective diffusivity, and partitioning coefficients to advance PA modeling efforts, and (iii) the U.S. Department of Energy (DOE) contractors and decision makers as they assess the IDF PA program. The results obtained help fill existing data gaps, support final selection of a LSWG waste form, and improve the technical defensibility of long-term waste form performance estimates.« less

  8. In situ determination of heat flow in unconsolidated sediments

    USGS Publications Warehouse

    Sass, J.H.; Kennelly, J.P.; Wendt, W.E.; Moses, T.H.; Ziagos, J.P.

    1979-01-01

    Subsurface thermal measurements are the most effective, least ambiguous tools for identifying and delineating possible geothernml resources. Measurements of thermal gradient in the upper few tens of meters generally are sufficient to outline the major anomalies, but it is always desirable to combine these gradients with reliable estimates of thermal conductivity to provide data on the energy flux and to constrain models for the heat sources responsible for the observed, near-surface thermal anomalies. The major problems associated with heat-flow measurements in the geothermal exploration mode are concerned with the economics of casing and/or grouting holes, the repeated site visits necessary to obtain equilibrium temperature values, the possible legal liability associated with the disturbance of underground aquifers, the surface hazards presented by pipes protruding from the ground, and the security problems associated with leaving cased holes open for periods of weeks to months. We have developed a technique which provides reliable 'real-time' determinations of temperature, thermal conductivity, and hence, of heat flow during the drilling operation in unconsolidated sediments. A combined temperature, gradient, and thermal conductivity experiment can be carried out, by driving a thin probe through the bit about 1.5 meters into the formation in the time that would otherwise be required for a coring trip. Two or three such experiments over the depth range of, say, 50 to 150 meters provide a high-quality heat-flow determination at costs comparable to those associated with a standard cased 'gradient hole' to comparable depths. The hole can be backfilled and abandoned upon cessation of drilling, thereby eliminating the need for casing, grouting, or repeated site visits.

  9. Preliminary investigation on the suitablity of using fiber reinforced concrete in the construction of a hazardous waste disposal vessel

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ramey, M.R.; Daie-e, G.

    1988-07-01

    There are certain hazardous wastes that must be contained in an extremely secure vessel for transportation and disposal. The vessel, among other things, must be able to withstand relatively large impacts without rupturing. Such containment vessels therefore must be able to absorb substantial amounts of energy during an impact and still perform their function. One of the impacts that the vessel must withstand is a 30-foot fall onto an unyielding surface. For some disposal scenarios it is proposed to encase the waste in a steel enclosure which is to be surrounded by a thick layer of concrete which, in turn,more » is encased by a relatively thin steel shell. Tests on concrete in compression and flexure, including static, dynamic and impact tests, have shown that low modulus concretes tend to behave in a less brittle manner than higher modulus concretes. Tests also show that fiber reinforced concretes have significantly greater ductility, crack propagation resistance and toughness than conventional concretes. Since it is known that concrete is a reasonably brittle material, it is necessary to do impact tests on sample containment structures consisting of thin-walled metal containers having closed ends which are filled with concrete, grout, or fiber reinforced concrete. This report presents the results of simple tests aimed at observing the behavior of sample containment structures subjected to impacts due to a fall from 30 feet. 8 figs., 4 tabs.« less

  10. Fixed-Precision Sequential Sampling Plans for Estimating Alfalfa Caterpillar, Colias lesbia, Egg Density in Alfalfa, Medicago sativa, Fields in Córdoba, Argentina

    PubMed Central

    Serra, Gerardo V.; Porta, Norma C. La; Avalos, Susana; Mazzuferi, Vilma

    2013-01-01

    The alfalfa caterpillar, Colias lesbia (Fabricius) (Lepidoptera: Pieridae), is a major pest of alfalfa, Medicago sativa L. (Fabales: Fabaceae), crops in Argentina. Its management is based mainly on chemical control of larvae whenever the larvae exceed the action threshold. To develop and validate fixed-precision sequential sampling plans, an intensive sampling programme for C. lesbia eggs was carried out in two alfalfa plots located in the Province of Córdoba, Argentina, from 1999 to 2002. Using Resampling for Validation of Sampling Plans software, 12 additional independent data sets were used to validate the sequential sampling plan with precision levels of 0.10 and 0.25 (SE/mean), respectively. For a range of mean densities of 0.10 to 8.35 eggs/sample, an average sample size of only 27 and 26 sample units was required to achieve a desired precision level of 0.25 for the sampling plans of Green and Kuno, respectively. As the precision level was increased to 0.10, average sample size increased to 161 and 157 sample units for the sampling plans of Green and Kuno, respectively. We recommend using Green's sequential sampling plan because it is less sensitive to changes in egg density. These sampling plans are a valuable tool for researchers to study population dynamics and to evaluate integrated pest management strategies. PMID:23909840

  11. Emperical Tests of Acceptance Sampling Plans

    NASA Technical Reports Server (NTRS)

    White, K. Preston, Jr.; Johnson, Kenneth L.

    2012-01-01

    Acceptance sampling is a quality control procedure applied as an alternative to 100% inspection. A random sample of items is drawn from a lot to determine the fraction of items which have a required quality characteristic. Both the number of items to be inspected and the criterion for determining conformance of the lot to the requirement are given by an appropriate sampling plan with specified risks of Type I and Type II sampling errors. In this paper, we present the results of empirical tests of the accuracy of selected sampling plans reported in the literature. These plans are for measureable quality characteristics which are known have either binomial, exponential, normal, gamma, Weibull, inverse Gaussian, or Poisson distributions. In the main, results support the accepted wisdom that variables acceptance plans are superior to attributes (binomial) acceptance plans, in the sense that these provide comparable protection against risks at reduced sampling cost. For the Gaussian and Weibull plans, however, there are ranges of the shape parameters for which the required sample sizes are in fact larger than the corresponding attributes plans, dramatically so for instances of large skew. Tests further confirm that the published inverse-Gaussian (IG) plan is flawed, as reported by White and Johnson (2011).

  12. National Dam Safety Program. Tivoli Lake Dam (Inventory Number N.Y. 52), Hudson River Basin, Rockland County, New York. Phase I Inspection Report,

    DTIC Science & Technology

    1980-09-30

    3/8" pea gravel., Apply I coat of Uniweld or Sika Dur Hi-Mod over old concrete to insure the proper bonding. V 2. Repeat process one for section over...Bay 1. 3. Chip out cracked concrete along Bays 7 and 8, apply one coat Colma Joint Primer and fill with Colma Joint Sealer (As manufactured by Sika ) 4...deck. Cracked concrete should be repaired with Sika Dur. Hi-Mod and application of low slump nonshrink grout’ made with antihydro cement

  13. Long-Term Ecological Monitoring Field Sampling Plan for 2007

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    T. Haney

    2007-07-31

    This field sampling plan describes the field investigations planned for the Long-Term Ecological Monitoring Project at the Idaho National Laboratory Site in 2007. This plan and the Quality Assurance Project Plan for Waste Area Groups 1, 2, 3, 4, 5, 6, 7, 10, and Removal Actions constitute the sampling and analysis plan supporting long-term ecological monitoring sampling in 2007. The data collected under this plan will become part of the long-term ecological monitoring data set that is being collected annually. The data will be used t determine the requirements for the subsequent long-term ecological monitoring. This plan guides the 2007more » investigations, including sampling, quality assurance, quality control, analytical procedures, and data management. As such, this plan will help to ensure that the resulting monitoring data will be scientifically valid, defensible, and of known and acceptable quality.« less

  14. Comparison of the efficiency between two sampling plans for aflatoxins analysis in maize

    PubMed Central

    Mallmann, Adriano Olnei; Marchioro, Alexandro; Oliveira, Maurício Schneider; Rauber, Ricardo Hummes; Dilkin, Paulo; Mallmann, Carlos Augusto

    2014-01-01

    Variance and performance of two sampling plans for aflatoxins quantification in maize were evaluated. Eight lots of maize were sampled using two plans: manual, using sampling spear for kernels; and automatic, using a continuous flow to collect milled maize. Total variance and sampling, preparation, and analysis variance were determined and compared between plans through multifactor analysis of variance. Four theoretical distribution models were used to compare aflatoxins quantification distributions in eight maize lots. The acceptance and rejection probabilities for a lot under certain aflatoxin concentration were determined using variance and the information on the selected distribution model to build the operational characteristic curves (OC). Sampling and total variance were lower at the automatic plan. The OC curve from the automatic plan reduced both consumer and producer risks in comparison to the manual plan. The automatic plan is more efficient than the manual one because it expresses more accurately the real aflatoxin contamination in maize. PMID:24948911

  15. Engineering study of 50 miscellaneous inactive underground radioactive waste tanks located at the Hanford Site, Washington

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Freeman-Pollard, J.R.

    1994-03-02

    This engineering study addresses 50 inactive underground radioactive waste tanks. The tanks were formerly used for the following functions associated with plutonium and uranium separations and waste management activities in the 200 East and 200 West Areas of the Hanford Site: settling solids prior to disposal of supernatant in cribs and a reverse well; neutralizing acidic process wastes prior to crib disposal; receipt and processing of single-shell tank (SST) waste for uranium recovery operations; catch tanks to collect water that intruded into diversion boxes and transfer pipeline encasements and any leakage that occurred during waste transfer operations; and waste handlingmore » and process experimentation. Most of these tanks have not been in use for many years. Several projects have, been planned and implemented since the 1970`s and through 1985 to remove waste and interim isolate or interim stabilize many of the tanks. Some tanks have been filled with grout within the past several years. Responsibility for final closure and/or remediation of these tanks is currently assigned to several programs including Tank Waste Remediation Systems (TWRS), Environmental Restoration and Remedial Action (ERRA), and Decommissioning and Resource Conservation and Recovery Act (RCRA) Closure (D&RCP). Some are under facility landlord responsibility for maintenance and surveillance (i.e. Plutonium Uranium Extraction [PUREX]). However, most of the tanks are not currently included in any active monitoring or surveillance program.« less

  16. 7 CFR 43.103 - Purpose and scope.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Regulations of the Department of Agriculture AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing... SAMPLING PLANS Sampling Plans § 43.103 Purpose and scope. (a) This subpart contains selected single and double sampling plans for inspection by attributes. They are to serve as a source of plans for developing...

  17. Groundwater maintenance at the vulcan materials quarry in Chattanooga, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, R.L.

    1985-01-01

    The Vulcan Materials Shallowford Road Quarry in Chattanooga, Tennessee is the largest active limestone quarry in the state. Currently it covers some 35 hectares with highwalls up to 100 m. Production is predominately from Middle Ordovician Limestone of the Stones River Group. The upper 60 m consists of medium-bedded gray limestone of the Pond Springs Formation, while the lower 40 m are in Lower Ordovician dolomites and limestones belonging to the Mascot Formation of the Knox Group. The present quarry began in 1951 and has been in continuous operation since that time. For several years the influx of groundwater intomore » the quarry was so great that over 11,355 liters per minute had to be removed by a series of pumps. A source of much of the groundwater was thought to be from Friar Branch which flowed near the present quarry site. At low water, several sinkholes were observed in the bottom of the stream. Several attempts were made (unsuccessfully) to fill these sinks. On July 17, 1984, a 184 m trench was dug along the north side of Friar Branch and fifty-one sections of 1.2 m diameter pipe were placed in the trench. Each 4 m section was made water tight and the water from Friar branch was then diverted into the pipe. Bulldozers scraped the dry bed of Friar Branch in an attempt to locate all major cavities and sinkholes. These were filled with grout and the bed of the creek was covered with about 7 to 8 cm of crushed rock and rolled. The entire stream was sealed with grout and then the stream was returned to its original course. The results was a marked reduction in groundwater seepage into the quarry.« less

  18. Discontinuum-Equivalent Continuum Analysis of the Stability of Tunnels in a Deep Coal Mine Using the Distinct Element Method

    NASA Astrophysics Data System (ADS)

    Shreedharan, Srisharan; Kulatilake, Pinnaduwa H. S. W.

    2016-05-01

    An imperative task for successful underground mining is to ensure the stability of underground structures. This is more so for deep excavations which may be under significantly high stresses. In this manuscript, we present stability studies on two tunnels, a horseshoe-shaped and an inverted arch-shaped tunnel, in a deep coal mine in China, performed using the 3DEC distinct element code. The rock mass mechanical property values for the tunnel shapes have been estimated through a back-analysis procedure using available field deformation data. The back-analysis has been carried out through a pseudo-time dependent support installation routine which incorporates the effect of time through a stress-relaxation mechanism. The back-analysis indicates that the rock mass cohesion, tensile strength, uniaxial compressive strength, and elastic modulus values are about 35-45 % of the corresponding intact rock property values. Additionally, the importance of incorporating stress relaxation before support installation has been illustrated through the increased support factor of safety and reduced grout failures. The calibrated models have been analyzed for different supported and unsupported cases to estimate the significance and adequacy of the current supports being used in the mine and to suggest a possible optimization. The effects of supports have been demonstrated using deformations and yield zones around the tunnels, and average factors of safety and grout failures of the supports. The use of longer supports and floor bolting has provided greater stability for the rock masses around the tunnels. Finally, a comparison between the two differently shaped tunnels establishes that the inverted arch tunnel may be more efficient in reducing roof sag and floor heave for the existing geo-mining conditions.

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marutzky, Sam; Farnham, Irene

    The purpose of the Nevada National Security Site (NNSS) Integrated Sampling Plan (referred to herein as the Plan) is to provide a comprehensive, integrated approach for collecting and analyzing groundwater samples to meet the needs and objectives of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) Activity. Implementation of this Plan will provide high-quality data required by the UGTA Activity for ensuring public protection in an efficient and cost-effective manner. The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP). The Plan’s scope comprises sample collectionmore » and analysis requirements relevant to assessing the extent of groundwater contamination from underground nuclear testing. This Plan identifies locations to be sampled by corrective action unit (CAU) and location type, sampling frequencies, sample collection methodologies, and the constituents to be analyzed. In addition, the Plan defines data collection criteria such as well-purging requirements, detection levels, and accuracy requirements; identifies reporting and data management requirements; and provides a process to ensure coordination between NNSS groundwater sampling programs for sampling of interest to UGTA. This Plan does not address compliance with requirements for wells that supply the NNSS public water system or wells involved in a permitted activity.« less

  20. Chain sampling plan (ChSP-1) for desired acceptable quality level (AQL) and limiting quality level (LQL)

    NASA Astrophysics Data System (ADS)

    Raju, C.; Vidya, R.

    2017-11-01

    Chain Sampling Plan is widely used whenever a small sample attributes plan is required to be used for situations involving destructive products coming out of continuous production process [1, 2]. This paper presents a procedure for the construction and selection of a ChSP-1 by attributes inspection based on membership functions [3]. A procedure using search technique is developed for obtaining the parameters of single sampling plan for a given set of AQL and LQL values. A sample of tables providing ChSP-1 plans for various combinations of AQL and LQL values are presented [4].

  1. Evaluating laser-driven Bremsstrahlung radiation sources for imaging and analysis of nuclear waste packages.

    PubMed

    Jones, Christopher P; Brenner, Ceri M; Stitt, Camilla A; Armstrong, Chris; Rusby, Dean R; Mirfayzi, Seyed R; Wilson, Lucy A; Alejo, Aarón; Ahmed, Hamad; Allott, Ric; Butler, Nicholas M H; Clarke, Robert J; Haddock, David; Hernandez-Gomez, Cristina; Higginson, Adam; Murphy, Christopher; Notley, Margaret; Paraskevoulakos, Charilaos; Jowsey, John; McKenna, Paul; Neely, David; Kar, Satya; Scott, Thomas B

    2016-11-15

    A small scale sample nuclear waste package, consisting of a 28mm diameter uranium penny encased in grout, was imaged by absorption contrast radiography using a single pulse exposure from an X-ray source driven by a high-power laser. The Vulcan laser was used to deliver a focused pulse of photons to a tantalum foil, in order to generate a bright burst of highly penetrating X-rays (with energy >500keV), with a source size of <0.5mm. BAS-TR and BAS-SR image plates were used for image capture, alongside a newly developed Thalium doped Caesium Iodide scintillator-based detector coupled to CCD chips. The uranium penny was clearly resolved to sub-mm accuracy over a 30cm(2) scan area from a single shot acquisition. In addition, neutron generation was demonstrated in situ with the X-ray beam, with a single shot, thus demonstrating the potential for multi-modal criticality testing of waste materials. This feasibility study successfully demonstrated non-destructive radiography of encapsulated, high density, nuclear material. With recent developments of high-power laser systems, to 10Hz operation, a laser-driven multi-modal beamline for waste monitoring applications is envisioned. Copyright © 2016. Published by Elsevier B.V.

  2. CRADA with Beckman Instruments and Pacific Northwest National Laboratory (PNL-013): Development and commercialization of the Unsaturated Flow Apparatus (UFA) using characterization of aridisols

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wright, J.; Conca, J.

    1996-10-01

    The objective of this Cooperative Research and Development Agreement (CRADA) was to develop and commercialize a technology conceived by scientists at Pacific Northwest National Laboratory (PNNL) and manufactured by Beckman Instruments, Inc. (Beckman), and to apply this technology to the characterization of and soils. The technology is the Unsaturated Flow Apparatus (UFA). The UFA provides a highly efficient method of direct, rapid measurement of hydraulic conductivity and other flow properties according to Darcy-Buckingham principles because the operator controls both the fluid driving force, using an ultracentrifuge, and the flow into the sample while it is spinning, with a rotating sealmore » assembly. The concept of using centrifugation to significantly decrease the time needed, from years or months to days, for study of subsurface transport, particularly under unsaturated conditions, was conceived by James Conca, Ph.D., and Judith Wright, Ph.D., in 1986. The prototype UFA was developed in 1988 because there was a need to rapidly and accurately determine transport parameters in soils, sediments, and rocks for the Grout Waste Disposal Program. Transport parameters are critical to modeling outcomes for site-specific solutions to environmental remediation and waste disposal problems.« less

  3. Spatial distribution and sequential sampling plans for Tuta absoluta (Lepidoptera: Gelechiidae) in greenhouse tomato crops.

    PubMed

    Cocco, Arturo; Serra, Giuseppe; Lentini, Andrea; Deliperi, Salvatore; Delrio, Gavino

    2015-09-01

    The within- and between-plant distribution of the tomato leafminer, Tuta absoluta (Meyrick), was investigated in order to define action thresholds based on leaf infestation and to propose enumerative and binomial sequential sampling plans for pest management applications in protected crops. The pest spatial distribution was aggregated between plants, and median leaves were the most suitable sample to evaluate the pest density. Action thresholds of 36 and 48%, 43 and 56% and 60 and 73% infested leaves, corresponding to economic thresholds of 1 and 3% damaged fruits, were defined for tomato cultivars with big, medium and small fruits respectively. Green's method was a more suitable enumerative sampling plan as it required a lower sampling effort. Binomial sampling plans needed lower average sample sizes than enumerative plans to make a treatment decision, with probabilities of error of <0.10. The enumerative sampling plan required 87 or 343 leaves to estimate the population density in extensive or intensive ecological studies respectively. Binomial plans would be more practical and efficient for control purposes, needing average sample sizes of 17, 20 and 14 leaves to take a pest management decision in order to avoid fruit damage higher than 1% in cultivars with big, medium and small fruits respectively. © 2014 Society of Chemical Industry.

  4. Liquid secondary waste: Waste form formulation and qualification

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cozzi, A. D.; Dixon, K. L.; Hill, K. A.

    The Hanford Site Effluent Treatment Facility (ETF) currently treats aqueous waste streams generated during site cleanup activities. When the Hanford Tank Waste Treatment and Immobilization Plant (WTP) begins operations, including Direct Feed Low Activity Waste (DFLAW) vitrification, a liquid secondary waste (LSW) stream from the WTP will need to be treated. The volume of effluent for treatment at the ETF will increase significantly. The powdered salt waste form produced by the ETF will be replaced by a stabilized solidified waste form for disposal in Hanford’s Integrated Disposal Facility (IDF). Washington River Protection Solutions is implementing a Secondary Liquid Waste Immobilizationmore » Technology Development Plan to address the technology needs for a waste form and solidification process to treat the increased volume of waste planned for disposal at the IDF. Waste form testing to support this plan is composed of work in the near term to provide data as input to a performance assessment (PA) for Hanford’s IDF. In 2015, three Hanford Liquid Secondary Waste simulants were developed based on existing and projected waste streams. Using these waste simulants, fourteen mixes of Hanford Liquid Secondary Waste were prepared and tested varying the waste simulant, the water-to-dry materials ratio, and the dry materials blend composition.1 In FY16, testing was performed using a simulant of the EMF process condensate blended with the caustic scrubber—from the Low Activity Waste (LAW) melter—, processed through the ETF. The initial EMF-16 simulant will be based on modeling efforts performed to determine the mass balance of the ETF for the DFLAW.2 The compressive strength of all of the mixes exceeded the target of 3.4 MPa (500 psi) to meet the requirements identified as potential IDF Waste Acceptance Criteria in Table 1 of the Secondary Liquid Waste Immobilization Technology Development Plan.3 The hydraulic properties of the waste forms tested (hydraulic conductivity and water characteristic curves) were comparable to the properties measured on the Savannah River Site (SRS) Saltstone waste form. Future testing should include efforts to first; 1) determine the rate and amount of ammonia released during each unit operation of the treatment process to determine if additional ammonia management is required, then; 2) reduce the ammonia content of the ETF concentrated brine prior to solidification, making the waste more amenable to grouting, or 3) manage the release of ammonia during production and ongoing release during storage of the waste form, or 4) develop a lower pH process/waste form thereby precluding ammonia release.« less

  5. Analysis of Monolith Cores from an Engineering Scale Demonstration of a Prospective Cast Stone Process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crawford, C. L.; Cozzi, A. D.; Hill, K. A.

    2016-06-01

    The primary disposition path of Low Activity Waste (LAW) at the DOE Hanford Site is vitrification. A cementitious waste form is one of the alternatives being considered for the supplemental immobilization of the LAW that will not be treated by the primary vitrification facility. Washington River Protection Solutions (WRPS) has been directed to generate and collect data on cementitious or pozzolanic waste forms such as Cast Stone. This report documents the coring and leach testing of monolithic samples cored from an engineering-scale demonstration (ES Demo) with non-radioactive simulants. The ES Demo was performed at SRNL in October of 2013 usingmore » the Scaled Continuous Processing Facility (SCPF) to fill an 8.5 ft. diameter x 3.25 ft. high container with simulated Cast Stone grout. The Cast Stone formulation was chosen from the previous screening tests. Legacy salt solution from previous Hanford salt waste testing was adjusted to correspond to the average LAW composition generated from the Hanford Tank Waste Operation Simulator (HTWOS). The dry blend materials, ordinary portland cement (OPC), Class F fly ash, and ground granulated blast furnace slag (GGBFS or BFS), were obtained from Lafarge North America in Pasco, WA. In 2014 core samples originally obtained approximately six months after filling the ES Demo were tested along with bench scale molded samples that were collected during the original pour. A latter set of core samples were obtained in late March of 2015, eighteen months after completion of the original ES Demo. Core samples were obtained using a 2” diameter x 11” long coring bit. The ES Demo was sampled in three different regions consisting of an outer ring, a middle ring and an inner core zone. Cores from these three lateral zones were further segregated into upper, middle and lower vertical segments. Monolithic core samples were tested using the Environmental Protection Agency (EPA) Method 1315, which is designed to provide mass transfer rates (release rates) of inorganic analytes contained in monolithic material under diffusion controlled release conditions as a function of leaching time. Compressive strength measurements and drying tests were also performed on the 2015 samples. Leachability indices reported are based on analyte concentrations determined from dissolution of the dried samples.« less

  6. System and method for removal of buried objects

    DOEpatents

    Alexander, Robert G [Richland, WA; Crass, Dennis [Kennewick, WA; Grams, William [Kennewick, WA; Phillips, Steven J [Sunnyside, WA; Riess, Mark [Kennewick, WA

    2008-06-03

    The present invention is a system and method for removal of buried objects. According to one embodiment of the invention, a crane with a vibrator casing driver is used to lift and suspend a large diameter steel casing over the buried object. Then the casing is driven into the ground by the vibratory driver until the casing surrounds the buried object. Then the open bottom of the casing is sealed shut by injecting grout into the ground within the casing near its bottom. When the seal has cured and hardened, the top of the casing is lifted to retrieve the casing, with the buried object inside, from the ground.

  7. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. SEPTEMBER 20, 1933 PHOTOGRAPH NO. 12 OF CONTRACT NO. 6 SHOWING EAST APPROACH – GROUT AROUND RUST JOINT. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  8. Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2012-10-24

    This plan incorporates U.S. Department of Energy (DOE) Office of Legacy Management (LM) standard operating procedures (SOPs) into environmental monitoring activities and will be implemented at all sites managed by LM. This document provides detailed procedures for the field sampling teams so that samples are collected in a consistent and technically defensible manner. Site-specific plans (e.g., long-term surveillance and maintenance plans, environmental monitoring plans) document background information and establish the basis for sampling and monitoring activities. Information will be included in site-specific tabbed sections to this plan, which identify sample locations, sample frequencies, types of samples, field measurements, and associatedmore » analytes for each site. Additionally, within each tabbed section, program directives will be included, when developed, to establish additional site-specific requirements to modify or clarify requirements in this plan as they apply to the corresponding site. A flowchart detailing project tasks required to accomplish routine sampling is displayed in Figure 1. LM environmental procedures are contained in the Environmental Procedures Catalog (LMS/PRO/S04325), which incorporates American Society for Testing and Materials (ASTM), DOE, and U.S. Environmental Protection Agency (EPA) guidance. Specific procedures used for groundwater and surface water monitoring are included in Appendix A. If other environmental media are monitored, SOPs used for air, soil/sediment, and biota monitoring can be found in the site-specific tabbed sections in Appendix D or in site-specific documents. The procedures in the Environmental Procedures Catalog are intended as general guidance and require additional detail from planning documents in order to be complete; the following sections fulfill that function and specify additional procedural requirements to form SOPs. Routine revision of this Sampling and Analysis Plan will be conducted annually at the beginning of each fiscal year when attachments in Appendix D, including program directives and sampling location/analytical tables, will be reviewed by project personnel and updated. The sampling location/analytical tables in Appendix D, however, may have interim updates according to project direction that are not reflected in this plan. Deviations from location/analytical tables in Appendix D prior to sampling will be documented in project correspondence (e.g., startup letters). If significant changes to other aspects of this plan are required before the annual update, then the plan will be revised as needed.« less

  9. 40 CFR 265.92 - Sampling and analysis.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Sampling and analysis. 265.92 Section... FACILITIES Ground-Water Monitoring § 265.92 Sampling and analysis. (a) The owner or operator must obtain and... follow a ground-water sampling and analysis plan. He must keep this plan at the facility. The plan must...

  10. 40 CFR 265.92 - Sampling and analysis.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Sampling and analysis. 265.92 Section... FACILITIES Ground-Water Monitoring § 265.92 Sampling and analysis. (a) The owner or operator must obtain and... follow a ground-water sampling and analysis plan. He must keep this plan at the facility. The plan must...

  11. ICP Corporate Customer Assessment - Sampling Plan

    DTIC Science & Technology

    1995-07-01

    CORPORATE CUSTOMER ASSESSMENT - SAMPLING PLAN JULY 1995 Lead Analyst: Lieutenant Commander William J. Wilkinson, USN Associate Analyst: Mr. Henry J...project developed a plan for conducting recurring surveys of Defense Logistics Agency customers , in support of the DLA Corporate Customer Assessment...Team. The primary product was a sampling plan, including stratification of customers by Military Service or Federal Agency and by commodity purchased

  12. Fixed precision sampling plans for white apple leafhopper (Homoptera: Cicadellidae) on apple.

    PubMed

    Beers, Elizabeth H; Jones, Vincent P

    2004-10-01

    Constant precision sampling plans for the white apple leafhopper, Typhlocyba pomaria McAtee, were developed so that it could be used as an indicator species for system stability as new integrated pest management programs without broad-spectrum pesticides are developed. Taylor's power law was used to model the relationship between the mean and the variance, and Green's constant precision sequential sample equation was used to develop sampling plans. Bootstrap simulations of the sampling plans showed greater precision (D = 0.25) than the desired precision (Do = 0.3), particularly at low mean population densities. We found that by adjusting the Do value in Green's equation to 0.4, we were able to reduce the average sample number by 25% and provided an average D = 0.31. The sampling plan described allows T. pomaria to be used as reasonable indicator species of agroecosystem stability in Washington apple orchards.

  13. Addendum to Sampling and Analysis Plan (SAP) for Assessment of LANL-Derived Residual Radionuclides in Soils within Tract A-16-d for Land Conveyance and Transfer for Sewage Treatment Facility Area

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Whicker, Jeffrey Jay; Gillis, Jessica Mcdonnel; Ruedig, Elizabeth

    This report summarizes the sampling design used, associated statistical assumptions, as well as general guidelines for conducting post-sampling data analysis. Sampling plan components presented here include how many sampling locations to choose and where within the sampling area to collect those samples. The type of medium to sample (i.e., soil, groundwater, etc.) and how to analyze the samples (in-situ, fixed laboratory, etc.) are addressed in other sections of the sampling plan.

  14. Spatial Distribution and Sampling Plans for Grapevine Plant Canopy-Inhabiting Scaphoideus titanus (Hemiptera: Cicadellidae) Nymphs.

    PubMed

    Rigamonti, Ivo E; Brambilla, Carla; Colleoni, Emanuele; Jermini, Mauro; Trivellone, Valeria; Baumgärtner, Johann

    2016-04-01

    The paper deals with the study of the spatial distribution and the design of sampling plans for estimating nymph densities of the grape leafhopper Scaphoideus titanus Ball in vine plant canopies. In a reference vineyard sampled for model parameterization, leaf samples were repeatedly taken according to a multistage, stratified, random sampling procedure, and data were subjected to an ANOVA. There were no significant differences in density neither among the strata within the vineyard nor between the two strata with basal and apical leaves. The significant differences between densities on trunk and productive shoots led to the adoption of two-stage (leaves and plants) and three-stage (leaves, shoots, and plants) sampling plans for trunk shoots- and productive shoots-inhabiting individuals, respectively. The mean crowding to mean relationship used to analyze the nymphs spatial distribution revealed aggregated distributions. In both the enumerative and the sequential enumerative sampling plans, the number of leaves of trunk shoots, and of leaves and shoots of productive shoots, was kept constant while the number of plants varied. In additional vineyards data were collected and used to test the applicability of the distribution model and the sampling plans. The tests confirmed the applicability 1) of the mean crowding to mean regression model on the plant and leaf stages for representing trunk shoot-inhabiting distributions, and on the plant, shoot, and leaf stages for productive shoot-inhabiting nymphs, 2) of the enumerative sampling plan, and 3) of the sequential enumerative sampling plan. In general, sequential enumerative sampling was more cost efficient than enumerative sampling.

  15. Designing a two-rank acceptance sampling plan for quality inspection of geospatial data products

    NASA Astrophysics Data System (ADS)

    Tong, Xiaohua; Wang, Zhenhua; Xie, Huan; Liang, Dan; Jiang, Zuoqin; Li, Jinchao; Li, Jun

    2011-10-01

    To address the disadvantages of classical sampling plans designed for traditional industrial products, we originally propose a two-rank acceptance sampling plan (TRASP) for the inspection of geospatial data outputs based on the acceptance quality level (AQL). The first rank sampling plan is to inspect the lot consisting of map sheets, and the second is to inspect the lot consisting of features in an individual map sheet. The TRASP design is formulated as an optimization problem with respect to sample size and acceptance number, which covers two lot size cases. The first case is for a small lot size with nonconformities being modeled by a hypergeometric distribution function, and the second is for a larger lot size with nonconformities being modeled by a Poisson distribution function. The proposed TRASP is illustrated through two empirical case studies. Our analysis demonstrates that: (1) the proposed TRASP provides a general approach for quality inspection of geospatial data outputs consisting of non-uniform items and (2) the proposed acceptance sampling plan based on TRASP performs better than other classical sampling plans. It overcomes the drawbacks of percent sampling, i.e., "strictness for large lot size, toleration for small lot size," and those of a national standard used specifically for industrial outputs, i.e., "lots with different sizes corresponding to the same sampling plan."

  16. Using known populations of pronghorn to evaluate sampling plans and estimators

    USGS Publications Warehouse

    Kraft, K.M.; Johnson, D.H.; Samuelson, J.M.; Allen, S.H.

    1995-01-01

    Although sampling plans and estimators of abundance have good theoretical properties, their performance in real situations is rarely assessed because true population sizes are unknown. We evaluated widely used sampling plans and estimators of population size on 3 known clustered distributions of pronghorn (Antilocapra americana). Our criteria were accuracy of the estimate, coverage of 95% confidence intervals, and cost. Sampling plans were combinations of sampling intensities (16, 33, and 50%), sample selection (simple random sampling without replacement, systematic sampling, and probability proportional to size sampling with replacement), and stratification. We paired sampling plans with suitable estimators (simple, ratio, and probability proportional to size). We used area of the sampling unit as the auxiliary variable for the ratio and probability proportional to size estimators. All estimators were nearly unbiased, but precision was generally low (overall mean coefficient of variation [CV] = 29). Coverage of 95% confidence intervals was only 89% because of the highly skewed distribution of the pronghorn counts and small sample sizes, especially with stratification. Stratification combined with accurate estimates of optimal stratum sample sizes increased precision, reducing the mean CV from 33 without stratification to 25 with stratification; costs increased 23%. Precise results (mean CV = 13) but poor confidence interval coverage (83%) were obtained with simple and ratio estimators when the allocation scheme included all sampling units in the stratum containing most pronghorn. Although areas of the sampling units varied, ratio estimators and probability proportional to size sampling did not increase precision, possibly because of the clumped distribution of pronghorn. Managers should be cautious in using sampling plans and estimators to estimate abundance of aggregated populations.

  17. Effect of Sampling Plans on the Risk of Escherichia coli O157 Illness.

    PubMed

    Kiermeier, Andreas; Sumner, John; Jenson, Ian

    2015-07-01

    Australia exports about 150,000 to 200,000 tons of manufacturing beef to the United States annually. Each lot is tested for Escherichia coli O157 using the N-60 sampling protocol, where 60 small pieces of surface meat from each lot of production are tested. A risk assessment of E. coli O157 illness from the consumption of hamburgers made from Australian manufacturing meat formed the basis to evaluate the effect of sample size and amount on the number of illnesses predicted. The sampling plans evaluated included no sampling (resulting in an estimated 55.2 illnesses per annum), the current N-60 plan (50.2 illnesses), N-90 (49.6 illnesses), N-120 (48.4 illnesses), and a more stringent N-60 sampling plan taking five 25-g samples from each of 12 cartons (47.4 illnesses per annum). While sampling may detect some highly contaminated lots, it does not guarantee that all such lots are removed from commerce. It is concluded that increasing the sample size or sample amount from the current N-60 plan would have a very small public health effect.

  18. Enumerative and binomial sequential sampling plans for the multicolored Asian lady beetle (Coleoptera: Coccinellidae) in wine grapes.

    PubMed

    Galvan, T L; Burkness, E C; Hutchison, W D

    2007-06-01

    To develop a practical integrated pest management (IPM) system for the multicolored Asian lady beetle, Harmonia axyridis (Pallas) (Coleoptera: Coccinellidae), in wine grapes, we assessed the spatial distribution of H. axyridis and developed eight sampling plans to estimate adult density or infestation level in grape clusters. We used 49 data sets collected from commercial vineyards in 2004 and 2005, in Minnesota and Wisconsin. Enumerative plans were developed using two precision levels (0.10 and 0.25); the six binomial plans reflected six unique action thresholds (3, 7, 12, 18, 22, and 31% of cluster samples infested with at least one H. axyridis). The spatial distribution of H. axyridis in wine grapes was aggregated, independent of cultivar and year, but it was more randomly distributed as mean density declined. The average sample number (ASN) for each sampling plan was determined using resampling software. For research purposes, an enumerative plan with a precision level of 0.10 (SE/X) resulted in a mean ASN of 546 clusters. For IPM applications, the enumerative plan with a precision level of 0.25 resulted in a mean ASN of 180 clusters. In contrast, the binomial plans resulted in much lower ASNs and provided high probabilities of arriving at correct "treat or no-treat" decisions, making these plans more efficient for IPM applications. For a tally threshold of one adult per cluster, the operating characteristic curves for the six action thresholds provided binomial sequential sampling plans with mean ASNs of only 19-26 clusters, and probabilities of making correct decisions between 83 and 96%. The benefits of the binomial sampling plans are discussed within the context of improving IPM programs for wine grapes.

  19. Ancient mortars from Cape Verde: mineralogical and physical characterization

    NASA Astrophysics Data System (ADS)

    Rocha, Fernando; Costa, Cristiana; Velosa, Ana; Quintela, Ana; Terroso, Denise; Marques, Vera

    2014-05-01

    Times and locations of different building constructions means different knowledge, habits, different construction methods and materials. The study and safeguarding of the architectural heritage takes nowadays a progressive importance as a vehicle for transmission of cultures and history of nations. The coatings are of great importance in the durability of a building due to the protective role of the masonry. The compatibility between the materials with which they are executed (masonry, mortar and grout settlement) promotes the proper functioning of the wall and a consequent increase in durability. Therefore, it becomes important to study and characterize the mortar coating of buildings to know its characteristics and to use compatible materials in the rehabilitation and maintenance of buildings. This study aims to characterize the chemical, physical, mechanical and mineralogical mortar samples collected in buildings in three islands of Cape Verde, for the conservation, rehabilitation and preservation of them. The collected samples belong to buildings constructed in the end of XIX century and in the beginning of XX century. In order to characterize the mortar samples some tests was made, such as X-Ray Diffraction, X- Ray Fluorescence, acid attack and mechanical strength. The samples were divided into three groups depending on origin; so we have a first group collected on the island of Santiago, the second on the island of Saint Vincent and the third on the island of Santo Antao. The samples are all carbonated, but Santiago samples have a lower carbonates content. In terms of insoluble residue (from the acid attack) it was concluded that the samples have similar value ranging from 9 to 26%. The compressive strength of the mortars have a range between 1.36 and 4.55 MPa, which is related to the presence of more binder in samples with higher resistance. The chemical and mineralogical analyzes showed that these consist of lime mortars (binder), natural pozzolan and basaltic sands, which would be expected because these buildings are in a volcanic complex. The addition of pozzolans mortars confers resistance. It will be important in the conservation and maintenance of these buildings to use mortars with the same constituents of those proposed on this study, for greater durability of the coating of these buildings. These basic properties provide a basis for the development of adequate interventions, preserving the characteristics of the buildings.

  20. Final report : sampling plan for pavement condition ratings of secondary roads.

    DOT National Transportation Integrated Search

    1984-01-01

    The purpose of this project was to develop a random sampling plan for use in selecting segments of the secondary highway system for evaluation under the Department's PMS. The plan developed is described here. It is a simple, workable, random sampling...

  1. FY2010 ANNUAL REVIEW E-AREA LOW-LEVEL WASTE FACILITY PERFORMANCE ASSESSMENT AND COMPOSITE ANALYSIS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Butcher, T.; Swingle, R.; Crapse, K.

    2011-01-01

    The E-Area Low-Level Waste Facility (ELLWF) consists of a number of disposal units described in the Performance Assessment (PA)(WSRC, 2008b) and Composite Analysis (CA)(WSRC, 1997; WSRC, 1999): Low-Activity Waste (LAW) Vault, Intermediate Level (IL) Vault, Trenches (Slit Trenches [STs], Engineered Trenches [ETs], and Component-in-Grout [CIG] Trenches), and Naval Reactor Component Disposal Areas (NRCDAs). This annual review evaluates the adequacy of the approved 2008 ELLWF PA along with the Special Analyses (SAs) approved since the PA was issued. The review also verifies that the Fiscal Year (FY) 2010 low-level waste (LLW) disposal operations were conducted within the bounds of the PA/SAmore » baseline, the Savannah River Site (SRS) CA, and the Department of Energy (DOE) Disposal Authorization Statement (DAS). Important factors considered in this review include waste receipts, results from monitoring and research and development (R&D) programs, and the adequacy of controls derived from the PA/SA baseline. Sections 1.0 and 2.0 of this review are a summary of the adequacy of the PA/SA and CA, respectively. An evaluation of the FY2010 waste receipts and the resultant impact on the ELLWF is summarized in Section 3.1. The results of the monitoring program, R&D program, and other relevant factors are found in Section 3.2, 3.3 and 3.4, respectively. Section 4.0 contains the CA annual determination similarly organized. SRS low-level waste management is regulated under DOE Order 435.1 (DOE, 1999a) and is authorized under a DAS as a federal permit. The original DAS was issued by the DOE-Headquarters (DOE-HQ) on September 28, 1999 (DOE, 1999b) for the operation of the ELLWF and the Saltstone Disposal Facility (SDF). The 1999 DAS remains in effect for the regulation of the SDF. Those portions of that DAS applicable to the ELLWF were superseded by revision 1 of the DAS on July 15, 2008 (DOE, 2008b). The 2008 PA and DAS were officially implemented by the facility on October 31, 2008 and are the authorization documents for this FY2010 Annual Review. Department of Energy Headquarters approval of the 2008 DAS was subject to numerous conditions specified in the document. Two of those conditions are to update the ELLWF closure plan and monitoring plan to align with the conceptual model analyzed in the PA. Both of these conditions were met with the issuance of the PA Monitoring Plan (Millings, 2009a) and the Closure Plan (Phifer et al, 2009a). The PA Monitoring Plan was approved by DOE on July 22, 2009 and the Closure Plan was approved by DOE on May 21, 2009. Both will be updated as needed to remain consistent with the PA. The DAS also specifies that the maintenance plan include activities to resolve each of the secondary issues identified in the DOEHQ review of the 2008 PA that were not completely addressed either with supplemental material provided to the review team or in final revisions to the PA. These outstanding issues were originally documented in the 2008 update of the PA/CA Maintenance Plan (WSRC, 2008a) and in subsequent PA/CA Maintenance Plans (most recently SRNS, 2010a) as required and are actively being worked.« less

  2. Nevada National Security Site Integrated Groundwater Sampling Plan, Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilborn, Bill R.; Boehlecke, Robert F.

    The purpose is to provide a comprehensive, integrated approach for collecting and analyzing groundwater samples to meet the needs and objectives of the DOE/EM Nevada Program’s UGTA Activity. Implementation of this Plan will provide high-quality data required by the UGTA Activity for ensuring public protection in an efficient and cost-effective manner. The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP) (NNSA/NFO, 2015); Federal Facility Agreement and Consent Order (FFACO) (1996, as amended); and DOE Order 458.1, Radiation Protection of the Public and the Environment (DOE, 2013). The Plan’s scope comprises sample collection and analysis requirementsmore » relevant to assessing both the extent of groundwater contamination from underground nuclear testing and impact of testing on water quality in downgradient communities. This Plan identifies locations to be sampled by CAU and location type, sampling frequencies, sample collection methodologies, and the constituents to be analyzed. In addition, the Plan defines data collection criteria such as well purging, detection levels, and accuracy requirements/recommendations; identifies reporting and data management requirements; and provides a process to ensure coordination between NNSS groundwater sampling programs for sampling analytes of interest to UGTA. Information used in the Plan development—including the rationale for selection of wells, sampling frequency, and the analytical suite—is discussed under separate cover (N-I, 2014) and is not reproduced herein. This Plan does not address compliance for those wells involved in a permitted activity. Sampling and analysis requirements associated with these wells are described in their respective permits and are discussed in NNSS environmental reports (see Section 5.2). In addition, sampling for UGTA CAUs that are in the Closure Report (CR) stage are not included in this Plan. Sampling requirements for these CAUs are described in the CR. Frenchman Flat is currently the only UGTA CAU in the CR stage. Sampling requirements for this CAU are described in Underground Test Area (UGTA) Closure Report for Corrective Action Unit 98: Frenchman Flat Nevada National Security Site, Nevada (NNSA/NFO, 2016).« less

  3. Surveillance plan for the early detection of H5N1 highly pathogenic avian influenza virus in migratory birds in the United States: surveillance year 2009

    USGS Publications Warehouse

    Brand, Christopher J.

    2009-01-01

    Executive Summary: This Surveillance Plan (Plan) describes plans for conducting surveillance of wild birds in the United States and its Territories and Freely-Associated States to provide for early detection of the introduction of the H5N1 Highly Pathogenic Avian Influenza (HPAI) subtype of the influenza A virus by migratory birds during the 2009 surveillance year, spanning the period of April 1, 2009 - March 31, 2010. The Plan represents a continuation of surveillance efforts begun in 2006 under the Interagency Strategic Plan for the Early Detection of H5N1 Highly Pathogenic Avian Influenza in Wild Migratory Birds (U.S. Department of Agriculture and U.S. Department of the Interior, 2006). The Plan sets forth sampling plans by: region, target species or species groups to be sampled, locations of sampling, sample sizes, and sampling approaches and methods. This Plan will be reviewed annually and modified as appropriate for subsequent surveillance years based on evaluation of information from previous years of surveillance, changing patterns and threats of H5N1 HPAI, and changes in funding availability for avian influenza surveillance. Specific sampling strategies will be developed accordingly within each of six regions, defined here as Alaska, Hawaiian/Pacific Islands, Lower Pacific Flyway (Washington, Oregon, California, Idaho, Nevada, Arizona), Central Flyway, Mississippi Flyway, and Atlantic Flyway.

  4. 7 CFR 43.106 - Choosing AQL's and sampling plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 2 2010-01-01 2010-01-01 false Choosing AQL's and sampling plans. 43.106 Section 43.106 Agriculture Regulations of the Department of Agriculture AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE COMMODITY STANDARDS AND STANDARD CONTAINER REGULATIONS STANDARDS FOR SAMPLING PLANS...

  5. PCB Analysis Plan for Tank Archive Samples

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NGUYEN, D.M.

    2001-03-22

    This analysis plan specifies laboratory analysis, quality assurance/quality control (QA/QC), and data reporting requirements for analyzing polychlorinated biphenyls (PCB) concentrations in archive samples. Tank waste archive samples that are planned for PCB analysis are identified in Nguyen 2001. The tanks and samples are summarized in Table 1-1. The analytical data will be used to establish a PCB baseline inventory in Hanford tanks.

  6. Coosa River Storage Annex, Talladega, Alabama Environmental Investigation, Final Management and Resources Utilization Plan

    DTIC Science & Technology

    1991-02-01

    to adequately assess the health and environmental risks associated with the closure and transfer of the Annex forI other use; and 3) identification of...1990); Draft Final Technical Plan, Draft Final Sampling Design Plan and Draft Final Health and Safety Plan, USATHAMA, June 1990. 2.1.2 Draft Final...Final Technical Plan, Sampling Design Plan and Health and Safety Plan) supplied by USATHAMA. The estimate may be revised, with USATHAMA approval, as

  7. Sampling Plans for the Thrips Frankliniella schultzei (Thysanoptera: Thripidae) in Three Lettuce Varieties.

    PubMed

    Silva, Alisson R; Rodrigues-Silva, Nilson; Pereira, Poliana S; Sarmento, Renato A; Costa, Thiago L; Galdino, Tarcísio V S; Picanço, Marcelo C

    2017-12-05

    The common blossom thrips, Frankliniella schultzei Trybom (Thysanoptera: Thripidae), is an important lettuce pest worldwide. Conventional sampling plans are the first step in implementing decision-making systems into integrated pest management programs. However, this tool is not available for F. schultzei infesting lettuce crops. Thus, the objective of this work was to develop a conventional sampling plan for F. schultzei in lettuce crops. Two sampling techniques (direct counting and leaf beating on a white plastic tray) were compared in crisphead, looseleaf, and Boston lettuce varieties before and during head formation. The frequency distributions of F. schultzei densities in lettuce crops were assessed, and the number of samples required to compose the sampling plan was determined. Leaf beating on a white plastic tray was the best sampling technique. F. schultzei densities obtained with this technique were fitted to the negative binomial distribution with a common aggregation parameter (common K = 0.3143). The developed sampling plan is composed of 91 samples per field and presents low errors in its estimates (up to 20%), fast execution time (up to 47 min), and low cost (up to US $1.67 per sampling area). This sampling plan can be used as a tool for integrated pest management in lettuce crops, assisting with reliable decision making in different lettuce varieties before and during head formation. © The Author(s) 2017. Published by Oxford University Press on behalf of Entomological Society of America. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  8. Well Abandonment at Various Sites, John F. Kennedy Space Center, Florida

    NASA Technical Reports Server (NTRS)

    Damphousse, Sarah Joan

    2016-01-01

    Between January 29 and March 9, 2016, a total of 23 monitoring wells were properly abandoned-in-place at five KSC sites (OPF-1&2, OPF-3, RDG, SRB, and HSB). The total abandonment encompassed 489.06 linear feet. The wells abandoned were constructed of PVC with diameters ranging from 1-inch to 2-inches. The shallowest well abandoned was measured to be 11.6 ft bls (OPF) and the deepest well abandoned was documented to be 51.45 feet bls (HSB). All aboveground completions were removed and each area was re-graded and/or grouted to surface to match existing surroundings. All materials (concrete pads, well casings, etc.) were disposed of accordingly.

  9. Installation Restoration Program (IRP), Phase II, Stage 1 - Problem Confirmation Study, Norton Air Force Base, San Bernardino, California. Volume 1. Technical Report.

    DTIC Science & Technology

    1985-07-01

    protein, and AFFF (Air Force Firefighting Foam). The frequency of training exercises has varied considerably over the years. During the early 1970’s...Surface ’ Cement/ Bentonite Grout Bentonite Seal Sand Pack 1. Ground Water Elevation r Mamaur July 4.5, 194 * . FIGURE 3-9 WELL CONSTRUCTION SUMMARY, ZONE...e zzzzzzzzz z I z z Z 0 -. N N E-3 3 0 3 3 w 3 w 0 o z ~ zzzzzzzz z z z z E- 0 0 E- 0z zzzzzzzz zz aua E- 0 4 10 zw 3 E- z 0 0 U)z V fC InZ OE- 3

  10. Offpost Operable Unit Remedial Investigation and Chemical Specific Applicable or Relevant and Appropriate Requirements, Version 3.1. Volume 2

    DTIC Science & Technology

    1988-12-01

    Protective Casing 5 Depth to Water AA It. cm. Materials Used Water Level Determined By 444 Plain PVC .S,/ 1 𔃾l,/e (64𔃻/9 " / V.’ ) >.ength Plain PVC...F 7I1. •lIi•,Z,,/. . DateooimelPersonnel Casing Painted oL e 0 /f tES OatIelTimne/Personnel Numbers Painted Tv’L/ .if h114 eaV Materials U~e 13 bq...8217 -L..L Borehole Completed as Monitoring Well? 1J0I Date/Time Griouting Completed ZI " ? "i6S" Depth of Tremmie Pipe 1 I Gallons of Grout __ Materials

  11. Research of cement mixtures with additions of industrial by-products

    NASA Astrophysics Data System (ADS)

    Papesch, R.; Klus, L.; Svoboda, J.; Zajac, R.

    2017-10-01

    The main goal of the article is the comparison of the possible use of secondary energy products. Used fly ashes, respectively steel dusts in cement mixes derive from production in Moravian-Silesian Region. The research focused on their influence on the chemical and physico-mechanical characteristics of the fresh and solid mixture. The aim was to find suitable formulations for grouting works, highway construction possibly rehabilitation of underground cavities created by mining activities. The introduction is mentioned the history of waste utilization up to current use as a product and the overall state of the problem. The conclusion is an evaluation of possible use in practice, including recommendations to carry out further tests.

  12. Guided waves in a monopile of an offshore wind turbine.

    PubMed

    Zernov, V; Fradkin, L; Mudge, P

    2011-01-01

    We study the guided waves in a structure which consists of two overlapping steel plates, with the overlapping section grouted. This geometry is often encountered in support structures of large industrial offshore constructions, such as wind turbine monopiles. It has been recognized for some time that the guided wave technology offers distinctive advantages for the ultrasonic inspections and health monitoring of structures of this extent. It is demonstrated that there exist advantageous operational regimes of ultrasonic transducers guaranteeing a good inspection range, even when the structures are totally submerged in water, which is a consideration when the wind turbines are deployed off shore. Copyright © 2010 Elsevier B.V. All rights reserved.

  13. Appendix E - Sample Production Facility Plan

    EPA Pesticide Factsheets

    This sample Spill Prevention, Control and Countermeasure (SPCC) Plan in Appendix E is intended to provide examples and illustrations of how a production facility could address a variety of scenarios in its SPCC Plan.

  14. Transportation Demand Management Planning At Multi-Tenant Buildings, An Example Of Tdm Planning During Project

    DOT National Transportation Integrated Search

    1988-09-01

    THIS GUIDE FOR DEVELOPERS, BUILDING OWNERS AND BUILDING MANAGERS IS ONE IN A SERIES OF SAMPLES OF TDM PLANS THAT ILLUSTRATE THE DESIGN AND PROPOSED APPLICATION OF TDM STRATEGIES. THIS SAMPLE PLAN WAS PREPARED FOR A FICTITIOUS BUILDING MANAGER NEAR DO...

  15. Development of sampling plans for cotton bolls injured by stink bugs (Hemiptera: Pentatomidae).

    PubMed

    Reay-Jones, F P F; Toews, M D; Greene, J K; Reeves, R B

    2010-04-01

    Cotton, Gossypium hirsutum L., bolls were sampled in commercial fields for stink bug (Hemiptera: Pentatomidae) injury during 2007 and 2008 in South Carolina and Georgia. Across both years of this study, boll-injury percentages averaged 14.8 +/- 0.3 (SEM). At average boll injury treatment levels of 10, 20, 30, and 50%, the percentage of samples with at least one injured boll was 82, 97, 100, and 100%, respectively. Percentage of field-sampling date combinations with average injury < 10, 20, 30, and 50% was 35, 80, 95, and 99%, respectively. At the average of 14.8% boll injury or 2.9 injured bolls per 20-boll sample, 112 samples at Dx = 0.1 (within 10% of the mean) were required for population estimation, compared with only 15 samples at Dx = 0.3. Using a sample size of 20 bolls, our study indicated that, at the 10% threshold and alpha = beta = 0.2 (with 80% confidence), control was not needed when <1.03 bolls were injured. The sampling plan required continued sampling for a range of 1.03-3.8 injured bolls per 20-boll sample. Only when injury was > 3.8 injured bolls per 20-boll sample was a control measure needed. Sequential sampling plans were also determined for thresholds of 20, 30, and 50% injured bolls. Sample sizes for sequential sampling plans were significantly reduced when compared with a fixed sampling plan (n=10) for all thresholds and error rates.

  16. Appendix F - Sample Contingency Plan

    EPA Pesticide Factsheets

    This sample Contingency Plan in Appendix F is intended to provide examples of contingency planning as a reference when a facility determines that the required secondary containment is impracticable, pursuant to 40 CFR §112.7(d).

  17. Appendix D - Sample Bulk Storage Facility Plan

    EPA Pesticide Factsheets

    This sample Spill Prevention, Control and Countermeasure (SPCC) Plan in Appendix D is intended to provide examples and illustrations of how a bulk storage facility could address a variety of scenarios in its SPCC Plan.

  18. 34 CFR Appendix A to Subpart N of... - Sample Default Prevention Plan

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 3 2011-07-01 2011-07-01 false Sample Default Prevention Plan A Appendix A to Subpart N of Part 668 Education Regulations of the Offices of the Department of Education (Continued) OFFICE... Default Rates Appendix A to Subpart N of Part 668—Sample Default Prevention Plan This appendix is provided...

  19. 40 CFR Appendix Xi to Part 86 - Sampling Plans for Selective Enforcement Auditing of Light-Duty Vehicles

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 19 2010-07-01 2010-07-01 false Sampling Plans for Selective Enforcement Auditing of Light-Duty Vehicles XI Appendix XI to Part 86 Protection of Environment ENVIRONMENTAL... Enforcement Auditing of Light-Duty Vehicles 40% AQL Table 1—Sampling Plan Code Letter Annual sales of...

  20. Microbiological sampling plan based on risk classification to verify supplier selection and production of served meals in food service operation.

    PubMed

    Lahou, Evy; Jacxsens, Liesbeth; Van Landeghem, Filip; Uyttendaele, Mieke

    2014-08-01

    Food service operations are confronted with a diverse range of raw materials and served meals. The implementation of a microbial sampling plan in the framework of verification of suppliers and their own production process (functionality of their prerequisite and HACCP program), demands selection of food products and sampling frequencies. However, these are often selected without a well described scientifically underpinned sampling plan. Therefore, an approach on how to set-up a focused sampling plan, enabled by a microbial risk categorization of food products, for both incoming raw materials and meals served to the consumers is presented. The sampling plan was implemented as a case study during a one-year period in an institutional food service operation to test the feasibility of the chosen approach. This resulted in 123 samples of raw materials and 87 samples of meal servings (focused on high risk categorized food products) which were analyzed for spoilage bacteria, hygiene indicators and food borne pathogens. Although sampling plans are intrinsically limited in assessing the quality and safety of sampled foods, it was shown to be useful to reveal major non-compliances and opportunities to improve the food safety management system in place. Points of attention deduced in the case study were control of Listeria monocytogenes in raw meat spread and raw fish as well as overall microbial quality of served sandwiches and salads. Copyright © 2014 Elsevier Ltd. All rights reserved.

  1. Data Validation Package August 2015 Groundwater Sampling at the Grand Junction, Colorado, Disposal Site October 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Frazier, William; Baur, Gary

    2015-11-03

    The 1998 Interim Long-Term Surveillance Plan for the Cheney Disposal Site Near Grand Junction, Colorado, requires annual monitoring to assess the performance of the disposal cell. Monitoring wells 0731, 0732 and 0733 were sampled as specified in the plan. Sampling and analyses were conducted in accordance with Sampling and Analysis Plan for the U.S. Department of Energy Office of Legacy Management Sites.

  2. Underground Test Area Calendar Year 2014 Annual Sampling Analysis Report Nevada National Security Site, Nevada, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farnham, Irene

    2016-12-01

    This report presents the analytical data for the 2014 fiscal year (FY) and calendar year (CY) (October 1, 2013, through December 31, 2014), and an evaluation of the data to ensure that the Sampling Plan’s objectives are met. In addition to samples collected and analyzed for the Sampling Plan, some NNSS wells are monitored by NNSA/NFO to demonstrate compliance with State-issued water discharge permits; with protection of groundwater from ongoing radiological waste disposal activities (compliance wells); and to demonstrate that the onsite drinking water supply is below SDWA maximum contaminant levels (MCLs) (public water system [PWS] wells). While not allmore » sampled locations are required by the Sampling Plan, these samples are relevant to its objectives and are therefore presented herein for completeness purposes. Special investigations that took place in 2014 that are relevant to the Sampling Plan are also presented. This is the first annual report released to support Sampling Plan implementation.« less

  3. SAMPLING OF CONTAMINATED SITES

    EPA Science Inventory

    A critical aspect of characterization of the amount and species of contamination of a hazardous waste site is the sampling plan developed for that site. f the sampling plan is not thoroughly conceptualized before sampling takes place, then certain critical aspects of the limits o...

  4. Identification of potential hazards associated with new residential construction.

    PubMed

    Methner, M M

    2000-02-01

    There were several advantages and limitations of this observational study. The most important advantage of this study was the opportunity to observe residential construction workers performing their jobs. By observing work practices, valuable information was gathered about specific trades and their potential exposure to various chemical and physical agents. This information will be useful in guiding subsequent exposure assessments. Probably the greatest limitation of this study was the lack of participation by homebuilders. Ideally, observations of construction processes would have been more objective if the study included the participation of more than one homebuilder. Aside from one worker who was observed to wear safety glasses, leather gloves, and a dust mask, virtually no personal protective equipment (PPE) was observed onsite. Often small contractors do not have the financial resources necessary to procure the appropriate PPE and issue these items to the workers. Based on hazard prevalence, professional judgement, and the degree of hazardous product use, potential exposures that warrant quantitative sampling efforts during Phase 2 of this study are: bulldozer/backhoe operators--noise, vibration, diesel exhaust; concrete workers--naphtha, mineral spirits, Portland cement; asphalt workers--petroleum hydrocarbons, asphalt, mineral spirits; plumbers--methylethyl ketone, acetone, tetrahydrofuran, cyclohexanone; drywall finishers--total and respirable dust, hexane, acetone; painters--ethylene glycol, VOCs; masons--dust (during the preparation of mortar); floor preparation technicians--total and respirable dust; and ceramic tile installers--toluene, naphtha, silica (from grout powder).

  5. Measuring and interpreting borehole strainmeter data to improve CO2 storage

    NASA Astrophysics Data System (ADS)

    Murdoch, L. C.; DeWolf, S.; Germanovich, L. N.; Moysey, S. M.; Hanna, A. C.; Hu, J.; Plunkett, G.; Blais, R.; Johnson, W.

    2017-12-01

    Injecting fluids into a well deforms the enveloping rocks in a complex pattern that increases in magnitude and expands outward with time, and measurements of this strain field may be useful for monitoring the injection process. A pair of instruments capable of measuring four components of strain and two components of tilt has been developed. One instrument is designed to be removeable, whereas the other one is grouted in place. The removeable strainmeter provides versatility and lower cost because it can be relocated, whereas the grout-in instrument provides better coupling to the formation, which should improve the strain signal. The new strainmeters have been deployed along with a Gladwin strainmeter at the Avant Field, an oil field north of Tulsa, Oklahoma. Oil and water are being pumped out, and water is being injected in multiple boreholes that intersect the Bartlesville formation at a depth of approximately 500 m at the Avant Field. The strainmeters have been deployed at a depth of 30 m near well 9A, an injection well near the edge of the field. Results from a brief, 4-hr-long injection test into well 9A show that the radial and circumferential strain increase (become tensile) with time during injection, reaching a maximum of several 10s of nanostrain. In another example, data from the Gladwin strainmeter showed the strain field changing with time when an injection well 1 km away was shut-in. This caused the strain along a radial direction to become tensile, while the circumferential strain became compressive. This trend reversed a week later when injection into the well resumed. The major axis of the principle strain aligned with the shut-in well. The observed strain signals are similar to results from poroelastic analyses, and preliminary inverse analyses sugest that strain signals can be used to estimate reservoir characteristics at the Avant Field.

  6. Bridge pier foundation evaluation using cross-hole seismic tomographic imaging

    NASA Astrophysics Data System (ADS)

    Butchibabu, B.; Sandeep, N.; Sivaram, Y. V.; Jha, P. C.; Khan, P. K.

    2017-09-01

    An ambitious project connecting Jammu and Srinagar through a railway link in tectonically active and geologically complex Himalayan Mountain terrain is under progress. Under this project, the world's highest (359 m) railway arch-bridge is under construction across the River Chenab in the northern territory of India. This mega engineering structure has a two-fold ribbed arch design, comprising of steel girders. During the excavation for one of the concrete pillars on the right abutment, wide open joints and weak/shear zones were noticed. The width of these joints varies from 30 to 50 cm, trending along N170° with a dip of 65°. The foundation area of this pillar is 13 m × 24 m and on the cut slopes of the right bank of Chenab River. These exposed joints and weak zones were treated with consolidation grouting to strengthen the foundation area. To delineate the extent of these joints and weak zones below the foundation level, seismic tomography was carried out in five boreholes drilled for this purpose to cover the 300 sq-m area. The results of cross-hole seismic tomography reveals the presence of three low velocity (≤ 2600 m/s) anomalous zones below the foundation area. This also ascertained the efficacy of grouting in consolidating the joints and weak zones. Later, rock-mass quality (Q) was determined based on the relationship between the P-wave velocity and the Q-value (Barton, 2002) to infer the support system for the slope stabilization below the foundation. 3-D visualization of the seismic velocity demarcates the extent of weak or untreated zones. This methodology facilitates to update the design parameters according to Q-values during the construction stage and estimate the required level of reinforcement and support system. Similar methodology can be applicable in other areas under same site conditions.

  7. Evaluation of final waste forms and recommendations for baseline alternatives to group and glass

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bleier, A.

    1997-09-01

    An assessment of final waste forms was made as part of the Federal Facilities Compliance Agreement/Development, Demonstration, Testing, and Evaluation (FFCA/DDT&E) Program because supplemental waste-form technologies are needed for the hazardous, radioactive, and mixed wastes of concern to the Department of Energy and the problematic wastes on the Oak Ridge Reservation. The principal objective was to identify a primary waste-form candidate as an alternative to grout (cement) and glass. The effort principally comprised a literature search, the goal of which was to establish a knowledge base regarding four areas: (1) the waste-form technologies based on grout and glass, (2) candidatemore » alternatives, (3) the wastes that need to be immobilized, and (4) the technical and regulatory constraints on the waste-from technologies. This report serves, in part, to meet this goal. Six families of materials emerged as relevant; inorganic, organic, vitrified, devitrified, ceramic, and metallic matrices. Multiple members of each family were assessed, emphasizing the materials-oriented factors and accounting for the fact that the two most prevalent types of wastes for the FFCA/DDT&E Program are aqueous liquids and inorganic sludges and solids. Presently, no individual matrix is sufficiently developed to permit its immediate implementation as a baseline alternative. Three thermoplastic materials, sulfur-polymer cement (inorganic), bitumen (organic), and polyethylene (organic), are the most technologically developed candidates. Each warrants further study, emphasizing the engineering and economic factors, but each also has limitations that regulate it to a status of short-term alternative. The crystallinity and flexible processing of sulfur provide sulfur-polymer cement with the highest potential for short-term success via encapsulation. Long-term immobilization demands chemical stabilization, which the thermoplastic matrices do not offer. Among the properties of the remaining candidates, those of glass-ceramics (devitrified matrices) represent the best compromise for meeting the probable stricter disposal requirements in the future.« less

  8. Stratification of American hearing aid users by age and audiometric characteristics: a method for representative sampling.

    PubMed

    Aronoff, Justin M; Yoon, Yang-soo; Soli, Sigfrid D

    2010-06-01

    Stratified sampling plans can increase the accuracy and facilitate the interpretation of a dataset characterizing a large population. However, such sampling plans have found minimal use in hearing aid (HA) research, in part because of a paucity of quantitative data on the characteristics of HA users. The goal of this study was to devise a quantitatively derived stratified sampling plan for HA research, so that such studies will be more representative and generalizable, and the results obtained using this method are more easily reinterpreted as the population changes. Pure-tone average (PTA) and age information were collected for 84,200 HAs acquired in 2006 and 2007. The distribution of PTA and age was quantified for each HA type and for a composite of all HA users. Based on their respective distributions, PTA and age were each divided into three groups, the combination of which defined the stratification plan. The most populous PTA and age group was also subdivided, allowing greater homogeneity within strata. Finally, the percentage of users in each stratum was calculated. This article provides a stratified sampling plan for HA research, based on a quantitative analysis of the distribution of PTA and age for HA users. Adopting such a sampling plan will make HA research results more representative and generalizable. In addition, data acquired using such plans can be reinterpreted as the HA population changes.

  9. Science: Curriculum Guide for Teaching Gifted Children Science in Grades One Through Three: A Sample Ecology Unit.

    ERIC Educational Resources Information Center

    California State Dept. of Education, Sacramento. Office of Curriculum Services.

    The natural science curriculum guide for gifted primary students includes a sample teaching-learning plan for an ecology unit and eight sample lesson plans. Chapter One provides an overview of the unit, a review of behavioral objectives, and a list of concepts and generalizations. The second chapter cites a teaching-learning plan dealing with such…

  10. 40 CFR Appendix X to Part 86 - Sampling Plans for Selective Enforcement Auditing of Heavy-Duty Engines and Light-Duty Trucks

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 19 2014-07-01 2014-07-01 false Sampling Plans for Selective Enforcement Auditing of Heavy-Duty Engines and Light-Duty Trucks X Appendix X to Part 86 Protection of... AND IN-USE HIGHWAY VEHICLES AND ENGINES Pt. 86, App. X Appendix X to Part 86—Sampling Plans for...

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tyrrell, Evan; Denny, Angelita

    Fifty-two groundwater samples and one surface water sample were collected at the Monument Valley, Arizona, Processing Site to monitor groundwater contaminants for evaluating the effectiveness of the proposed compliance strategy as specified in the 1999 Final Site Observational Work Plan for the UMTRA Project Site at Monument Valley, Arizona. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and-analysis-plan-us-department- energy-office-legacy-management-sites). Samples were collected for metals, anions, nitrate + nitrite as N, and ammonia as N analyses at all locations.

  12. Customized sampling plans : a guide to alternative sampling techniques for National Transit Database reporting

    DOT National Transportation Integrated Search

    2004-05-01

    For estimating the system total unlinked passenger trips and passenger miles of a fixed-route bus system for the National Transit Database (NTD), the FTA approved sampling plans may either over-sample or do not yield FTAs required confidence and p...

  13. IAEA Sampling Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Geist, William H.

    2017-09-15

    The objectives for this presentation are to describe the method that the IAEA uses to determine a sampling plan for nuclear material measurements; describe the terms detection probability and significant quantity; list the three nuclear materials measurement types; describe the sampling method applied to an item facility; and describe multiple method sampling.

  14. Statistical Methods in Assembly Quality Management of Multi-Element Products on Automatic Rotor Lines

    NASA Astrophysics Data System (ADS)

    Pries, V. V.; Proskuriakov, N. E.

    2018-04-01

    To control the assembly quality of multi-element mass-produced products on automatic rotor lines, control methods with operational feedback are required. However, due to possible failures in the operation of the devices and systems of automatic rotor line, there is always a real probability of getting defective (incomplete) products into the output process stream. Therefore, a continuous sampling control of the products completeness, based on the use of statistical methods, remains an important element in managing the quality of assembly of multi-element mass products on automatic rotor lines. The feature of continuous sampling control of the multi-element products completeness in the assembly process is its breaking sort, which excludes the possibility of returning component parts after sampling control to the process stream and leads to a decrease in the actual productivity of the assembly equipment. Therefore, the use of statistical procedures for continuous sampling control of the multi-element products completeness when assembled on automatic rotor lines requires the use of such sampling plans that ensure a minimum size of control samples. Comparison of the values of the limit of the average output defect level for the continuous sampling plan (CSP) and for the automated continuous sampling plan (ACSP) shows the possibility of providing lower limit values for the average output defects level using the ACSP-1. Also, the average sample size when using the ACSP-1 plan is less than when using the CSP-1 plan. Thus, the application of statistical methods in the assembly quality management of multi-element products on automatic rotor lines, involving the use of proposed plans and methods for continuous selective control, will allow to automating sampling control procedures and the required level of quality of assembled products while minimizing sample size.

  15. Data Validation Package, June 2016 Groundwater Sampling at the Hallam, Nebraska, Decommissioned Reactor Site, August 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Surovchak, Scott; Miller, Michele

    The 2008 Long-Term Surveillance Plan [LTSP] for the Decommissioned Hallam Nuclear Power Facility, Hallam, Nebraska (http://www.lm.doe.gov/Hallam/Documents.aspx) requires groundwater monitoring once every 2 years. Seventeen monitoring wells at the Hallam site were sampled during this event as specified in the plan. Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. Water levels were measured at all sampled wells and at two additional wells (6A and 6B) prior to the start of sampling. Additionally, water levels of each sampled well were measured at the beginning of sampling. See Attachment 2, Trip Report, for additional details. Sampling and analysismore » were conducted as specified in Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and-analysis-plan-us-department- energy-office-legacy-management-sites). Gross alpha and gross beta are the only parameters that were detected at statistically significant concentrations. Time/concentration graphs of the gross alpha and gross beta data are included in Attachment 3, Data Presentation. The gross alpha and gross beta activity concentrations observed are consistent with values previously observed and are attributed to naturally occurring radionuclides (e.g., uranium and uranium decay chain products) in the groundwater.« less

  16. UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Durango, Colorado, are described in this water sampling and analysis plan. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine monitoring stations at the site. The ground water data are used to characterize the site ground water compliance strategies and to monitor contaminants of potential concern identified in the baseline risk assessment (DOE, 1995a). Regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from themore » US EPA regulations in 40 CFR Part 192 (1994) and EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site.« less

  17. Parameters of Concrete Modified with Glass Meal and Chalcedonite Dust

    NASA Astrophysics Data System (ADS)

    Kotwa, Anna

    2017-10-01

    Additives used for production of concrete mixtures affect the rheological properties and parameters of hardened concrete, including compressive strength, water resistance, durability and shrinkage of hardened concrete. By their application, the use of cement and production costs may be reduced. The scheduled program of laboratory tests included preparation of six batches of concrete mixtures with addition of glass meal and / or chalcedonite dust. Mineral dust is a waste product obtained from crushed aggregate mining, with grain size below 0,063μm. The main ingredient of chalcedonite dust is silica. Glass meal used in the study is a material with very fine grain size, less than 65μm. This particle size is present in 60% - 90% of the sample. Additives were used to replace cement in concrete mixes in an amount of 15% and 25%. The amount of aggregate was left unchanged. The study used Portland cement CEM I 42.5R. Concrete mixes were prepared with a constant rate w / s = 0.4. The aim of the study was to identify the effect of the addition of chalcedonite dust and / or glass meal on the parameters of hardened concrete, i.e. compressive strength, water absorption and capillarity. Additives used in the laboratory tests significantly affect the compressive strength. The largest decrease in compressive strength of concrete samples was recorded for samples with 50% substitutes of cement additives. This decrease is 34.35%. The smallest decrease in compressive strength was noted in concrete with the addition of 15% of chalcedonite dust or 15% glass meal, it amounts to an average of 15%. The study of absorption shows that all concrete with the addition of chalcedonite dust and glass meal gained a percentage weight increase between 2.7 ÷ 3.1% for the test batches. This is a very good result, which is probably due to grout sealing. In capillary action for the test batches, the percentage weight gains of samples ranges from 4.6% to 5.1%. However, the reference concrete obtained the lowest water absorption as compared to other batches.

  18. Data Validation Package - July 2016 Groundwater Sampling at the Gunnison, Colorado, Disposal Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Linard, Joshua; Campbell, Sam

    Groundwater sampling at the Gunnison, Colorado, Disposal Site is conducted every 5 years to monitor disposal cell performance. During this event, samples were collected from eight monitoring wells as specified in the 1997 Long-Term Surveillance Plan for the Gunnison, Colorado, Disposal Site. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for US Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and­ analysis-plan-us-department-energy-office-legacy-management-sites). Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. A duplicate sample was collected from location 0723. Water levels were measured at all monitoring wells thatmore » were sampled and seven additional wells. The analytical data and associated qualifiers can be viewed in environmental database reports and are also available for viewing with dynamic mapping via the GEMS (Geospatial Environmental Mapping System) website at http://gems.lm.doe.gov/#. No issues were identified during the data validation process that require additional action or follow-up.« less

  19. Development of binomial sequential sampling plans for forecasting Listronotus maculicollis (Coleoptera: Curculionidae) larvae based on the relationship to adult counts and turfgrass damage.

    PubMed

    McGraw, Benjamin A; Koppenhöfer, Albrecht M

    2009-06-01

    Binomial sequential sampling plans were developed to forecast weevil Listronotus maculicollis Kirby (Coleoptera: Curculionidae), larval damage to golf course turfgrass and aid in the development of integrated pest management programs for the weevil. Populations of emerging overwintered adults were sampled over a 2-yr period to determine the relationship between adult counts, larval density, and turfgrass damage. Larval density and composition of preferred host plants (Poa annua L.) significantly affected the expression of turfgrass damage. Multiple regression indicates that damage may occur in moderately mixed P. annua stands with as few as 10 larvae per 0.09 m2. However, > 150 larvae were required before damage became apparent in pure Agrostis stolonifera L. plots. Adult counts during peaks in emergence as well as cumulative counts across the emergence period were significantly correlated to future densities of larvae. Eight binomial sequential sampling plans based on two tally thresholds for classifying infestation (T = 1 and two adults) and four adult density thresholds (0.5, 0.85, 1.15, and 1.35 per 3.34 m2) were developed to forecast the likelihood of turfgrass damage by using adult counts during peak emergence. Resampling for validation of sample plans software was used to validate sampling plans with field-collected data sets. All sampling plans were found to deliver accurate classifications (correct decisions were made between 84.4 and 96.8%) in a practical timeframe (average sampling cost < 22.7 min).

  20. [Sequential sampling plans to Orthezia praelonga Douglas (Hemiptera: Sternorrhyncha, Ortheziidae) in citrus].

    PubMed

    Costa, Marilia G; Barbosa, José C; Yamamoto, Pedro T

    2007-01-01

    The sequential sampling is characterized by using samples of variable sizes, and has the advantage of reducing sampling time and costs if compared to fixed-size sampling. To introduce an adequate management for orthezia, sequential sampling plans were developed for orchards under low and high infestation. Data were collected in Matão, SP, in commercial stands of the orange variety 'Pêra Rio', at five, nine and 15 years of age. Twenty samplings were performed in the whole area of each stand by observing the presence or absence of scales on plants, being plots comprised of ten plants. After observing that in all of the three stands the scale population was distributed according to the contagious model, fitting the Negative Binomial Distribution in most samplings, two sequential sampling plans were constructed according to the Sequential Likelihood Ratio Test (SLRT). To construct these plans an economic threshold of 2% was adopted and the type I and II error probabilities were fixed in alpha = beta = 0.10. Results showed that the maximum numbers of samples expected to determine control need were 172 and 76 samples for stands with low and high infestation, respectively.

  1. Development of an automated pre-sampling plan for construction projects : final report.

    DOT National Transportation Integrated Search

    1983-03-01

    The development of an automated pre-sampling plan was undertaken to free the district construction personnel from the cumbersome and time-consuming task of preparing such plans manually. A computer program was written and linked to a data file which ...

  2. Validation of fixed sample size plans for monitoring lepidopteran pests of Brassica oleracea crops in North Korea.

    PubMed

    Hamilton, A J; Waters, E K; Kim, H J; Pak, W S; Furlong, M J

    2009-06-01

    The combined action of two lepidoteran pests, Plutella xylostella L. (Plutellidae) and Pieris rapae L. (Pieridae),causes significant yield losses in cabbage (Brassica oleracea variety capitata) crops in the Democratic People's Republic of Korea. Integrated pest management (IPM) strategies for these cropping systems are in their infancy, and sampling plans have not yet been developed. We used statistical resampling to assess the performance of fixed sample size plans (ranging from 10 to 50 plants). First, the precision (D = SE/mean) of the plans in estimating the population mean was assessed. There was substantial variation in achieved D for all sample sizes, and sample sizes of at least 20 and 45 plants were required to achieve the acceptable precision level of D < or = 0.3 at least 50 and 75% of the time, respectively. Second, the performance of the plans in classifying the population density relative to an economic threshold (ET) was assessed. To account for the different damage potentials of the two species the ETs were defined in terms of standard insects (SIs), where 1 SI = 1 P. rapae = 5 P. xylostella larvae. The plans were implemented using different economic thresholds (ETs) for the three growth stages of the crop: precupping (1 SI/plant), cupping (0.5 SI/plant), and heading (4 SI/plant). Improvement in the classification certainty with increasing sample sizes could be seen through the increasing steepness of operating characteristic curves. Rather than prescribe a particular plan, we suggest that the results of these analyses be used to inform practitioners of the relative merits of the different sample sizes.

  3. Enumerative and binomial sampling plans for citrus mealybug (Homoptera: pseudococcidae) in citrus groves.

    PubMed

    Martínez-Ferrer, María Teresa; Ripollés, José Luís; Garcia-Marí, Ferran

    2006-06-01

    The spatial distribution of the citrus mealybug, Planococcus citri (Risso) (Homoptera: Pseudococcidae), was studied in citrus groves in northeastern Spain. Constant precision sampling plans were designed for all developmental stages of citrus mealybug under the fruit calyx, for late stages on fruit, and for females on trunks and main branches; more than 66, 286, and 101 data sets, respectively, were collected from nine commercial fields during 1992-1998. Dispersion parameters were determined using Taylor's power law, giving aggregated spatial patterns for citrus mealybug populations in three locations of the tree sampled. A significant relationship between the number of insects per organ and the percentage of occupied organs was established using either Wilson and Room's binomial model or Kono and Sugino's empirical formula. Constant precision (E = 0.25) sampling plans (i.e., enumerative plans) for estimating mean densities were developed using Green's equation and the two binomial models. For making management decisions, enumerative counts may be less labor-intensive than binomial sampling. Therefore, we recommend enumerative sampling plans for the use in an integrated pest management program in citrus. Required sample sizes for the range of population densities near current management thresholds, in the three plant locations calyx, fruit, and trunk were 50, 110-330, and 30, respectively. Binomial sampling, especially the empirical model, required a higher sample size to achieve equivalent levels of precision.

  4. A consolidated environmental monitoring plan for Aberdeen Proving Ground, Maryland

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ebinger, M.H.; Hansen, W.R.

    1997-04-01

    The US Army operates facilities in Edgewood and Aberdeen under several licenses from the Nuclear Regulatory Commission (NRC). Compliance with each license is time consuming and could potentially result in duplicated efforts to demonstrate compliance with existing environmental regulations. The goal of the ERM plan is to provide the sampling necessary to ensure that operations at Edgewood and Aberdeen are within applicable regulatory guidelines and to provide a means of ensuring that adverse effects to the environment are minimized. Existing sampling plans and environmental data generated from those plans are briefly reviewed as part of the development of the presentmore » ERM plan. The new ERM plan was designed to provide data that can be used for assessing risks to the environment and to humans using Aberdeen and Edgewood areas. Existing sampling is modified and new sampling is proposed based on the results of the long-term DU fate study. In that study, different environmental pathways were identified that would show transport of DU at Aberdeen. Those pathways would also be impacted by other radioactive constituents from Aberdeen and Edgewood areas. The ERM plan presented in this document includes sampling from Edgewood and Aberdeen facilities. The main radioactive constituents of concern at Edgewood are C, P, N, S, H, I, Co, Cs, Ca, Sr and U that are used in radiolabeling different compounds and tracers for different reactions and syntheses. Air and water sampling are the thrust of efforts at the Edgewood area.« less

  5. The Evaluation of Carpet Steam/Heat Cleaners as Biological Sampling Device

    DTIC Science & Technology

    2011-12-08

    Vacuum Cleaner Evaluation as sampling Device Test Plan DHS Page 16 of 16 Fumigants , and Issues Related to Laboratory-scale Studies. Appl. Environ...ECBC Wet/dry Vacuum Cleaner Evaluation as sampling Device Test Plan DHS Page 1 of 16 Test Plan for The Evaluation of Carpet Steam...b. ABSTRACT unclassified c. THIS PAGE unclassified Standard Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18 ECBC Wet/dry Vacuum Cleaner

  6. An Experimental Study of Diffusivity of Technetium-99 in Hanford Vadose Zone Sediments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mattigod, Shas V.; Bovaird, Chase C.; Wellman, Dawn M.

    2012-11-01

    One of the methods being considered at the Hanford site in Washington for safely disposing of low-level radioactive wastes (LLW) is to encase the waste in concrete and entomb the packages in the Hanford vadose zone sediments. The current plan for waste isolation consists of stacking low-level waste packages on a trench floor, surrounding the stacks with reinforced steel, and encasing these packages with concrete. Any failure of the concrete encasement may result in water intrusion and consequent mobilization of radionuclides from the waste packages. The mobilized radionuclides may escape from the encased concrete by mass flow and/or diffusion andmore » move into the surrounding subsurface sediments. It is therefore necessary to conduct an assessment of the performance of the concrete encasement structure and the surrounding soil’s ability to retard radionuclide migration. The retardation factors for radionuclides contained in the waste packages can be determined from measurements of diffusion coefficients for these contaminants through concrete and fill material. Because of their anionic nature in aqueous solutions, the radionuclides, 99Tc and 129I were identified as long-term dose contributors in LLW. The leachability and/or diffusion of these radionuclide species must be measured in order to assess the long-term performance of waste grouts when contacted with vadose-zone porewater or groundwater. To measure the diffusivity, a set of experiments were conducted using 99Tc-spiked concrete (with 0 and 4% metallic iron additions) in contact with unsaturated soil half-cells that reflected the typical moisture contents of Hanford vadose zone sediments. The 99Tc diffusion profiles in the soil half cells were measured after a time lapse of ~1.9 yr. Using the concentration profiles, the 99Tc diffusivity coefficients were calculated based on Fick’s Second Law.« less

  7. The Remediation of Abandoned Iron Ore Mine Subsidence in Rockaway Township, New Jersey

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gartenberg, Gary; Poff, Gregory

    2010-06-30

    This report represents the twenty-seventh and Final Technical Progress Report issued in connection with the subsidence remediation projects undertaken by Rockaway Township in Morris County, New Jersey. This report provides a summary of the major project work accomplished during this last reporting period ending June 30, 2010 and a summary of the work accomplished since the agreement inception in 1997. This report is issued as part of the project reporting provisions set forth in the Cooperator's Agreement between the United States Government - Department of Energy, and Rockaway Township. The purpose of the Cooperator's Agreement is for the Department ofmore » Energy to provide technical and financial assistance in a coordinated effort with Rockaway Township to develop and implement a multi-phased plan to remediate ground stability problems associated with abandoned mining activity. Primarily during the 1800's, extensive iron ore mining and prospecting was undertaken in Rockaway Township, part of the Dover District Mining region in Morris County. The abandoned mining activity has resulted in public safety hazards associated with ground collapse and surface subsidence features evolving in both developed and undeveloped areas within Rockaway Township. At the Green Pond Mine site at the Township's Jacobs Road Compost Storage Facility, surface monitoring continued after completion of construction in September 2003. Surface monitoring was conducted periodically at the Mt. Hope Road subsidence work area and adjacent areas after the January 2000 construction effort. In March 2007, a seventh collapse occurred over a portion of the White Meadow Mine in a public roadway at the intersection of Iowa and Erie Avenues in Rockaway Township. After test drilling, this portion of the mine was remediated by drilling and grouting the stopes.« less

  8. Igniting Creativity and Planning for Your Gifted Students.

    ERIC Educational Resources Information Center

    Russell, Don W., Ed.

    The collection of instructional plans is designed to offer samples of strategies and ideas to teachers involved with gifted students. Approximately 30 plans are presented for the following areas (sample subtopics in science (atomic fusion), social studies (mores and folkways), mathematics (spatial relations), health and physiology, philosophy, and…

  9. Data Validation Package June 2016 Groundwater and Surface Water Sampling at the Old and New Rifle, Colorado, Processing Sites September 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bush, Richard; Lemke, Peter

    Sampling Period: June 14–17 and July 7, 2016. Water samples were collected from 36 locations at New Rifle and Old Rifle, Colorado, Disposal/Processing Sites. Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. Duplicate samples were collected from New Rifle locations 0216 and 0855, and Old Rifle location 0655. One equipment blank was collected after decontamination of non-dedicated equipment used to collect one surface water sample. See Attachment 2, Trip Report for additional details. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Managementmore » Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and- analysis-plan-us-department-energy-office-legacy-management-sites). New Rifle Site Samples were collected at the New Rifle site from 16 monitoring wells and 7 surface locations in compliance with the December 2008 Groundwater Compliance Action Plan [GCAP] for the New Rifle, Colorado, Processing Site (LMS/RFN/S01920). Monitoring well 0216 could not be sampled in June because it was surrounded by standing water due to the high river stage from spring runoff, it was later sampled in July. Monitoring well 0635 and surface location 0322 could not be sampled because access through the elk fence along Interstate 70 has not been completed at this time. Old Rifle Site Samples were collected at the Old Rifle site from eight monitoring wells and five surface locations in compliance with the December 2001 Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site (GJ0-2000-177-TAR).« less

  10. Cost-effective binomial sequential sampling of western bean cutworm, Striacosta albicosta (Lepidoptera: Noctuidae), egg masses in corn.

    PubMed

    Paula-Moraes, S; Burkness, E C; Hunt, T E; Wright, R J; Hein, G L; Hutchison, W D

    2011-12-01

    Striacosta albicosta (Smith) (Lepidoptera: Noctuidae), is a native pest of dry beans (Phaseolus vulgaris L.) and corn (Zea mays L.). As a result of larval feeding damage on corn ears, S. albicosta has a narrow treatment window; thus, early detection of the pest in the field is essential, and egg mass sampling has become a popular monitoring tool. Three action thresholds for field and sweet corn currently are used by crop consultants, including 4% of plants infested with egg masses on sweet corn in the silking-tasseling stage, 8% of plants infested with egg masses on field corn with approximately 95% tasseled, and 20% of plants infested with egg masses on field corn during mid-milk-stage corn. The current monitoring recommendation is to sample 20 plants at each of five locations per field (100 plants total). In an effort to develop a more cost-effective sampling plan for S. albicosta egg masses, several alternative binomial sampling plans were developed using Wald's sequential probability ratio test, and validated using Resampling for Validation of Sampling Plans (RVSP) software. The benefit-cost ratio also was calculated and used to determine the final selection of sampling plans. Based on final sampling plans selected for each action threshold, the average sample number required to reach a treat or no-treat decision ranged from 38 to 41 plants per field. This represents a significant savings in sampling cost over the current recommendation of 100 plants.

  11. National Sample Assessment Protocols

    ERIC Educational Resources Information Center

    Ministerial Council on Education, Employment, Training and Youth Affairs (NJ1), 2012

    2012-01-01

    These protocols represent a working guide for planning and implementing national sample assessments in connection with the national Key Performance Measures (KPMs). The protocols are intended for agencies involved in planning or conducting national sample assessments and personnel responsible for administering associated tenders or contracts,…

  12. Decision Models for Determining the Optimal Life Test Sampling Plans

    NASA Astrophysics Data System (ADS)

    Nechval, Nicholas A.; Nechval, Konstantin N.; Purgailis, Maris; Berzins, Gundars; Strelchonok, Vladimir F.

    2010-11-01

    Life test sampling plan is a technique, which consists of sampling, inspection, and decision making in determining the acceptance or rejection of a batch of products by experiments for examining the continuous usage time of the products. In life testing studies, the lifetime is usually assumed to be distributed as either a one-parameter exponential distribution, or a two-parameter Weibull distribution with the assumption that the shape parameter is known. Such oversimplified assumptions can facilitate the follow-up analyses, but may overlook the fact that the lifetime distribution can significantly affect the estimation of the failure rate of a product. Moreover, sampling costs, inspection costs, warranty costs, and rejection costs are all essential, and ought to be considered in choosing an appropriate sampling plan. The choice of an appropriate life test sampling plan is a crucial decision problem because a good plan not only can help producers save testing time, and reduce testing cost; but it also can positively affect the image of the product, and thus attract more consumers to buy it. This paper develops the frequentist (non-Bayesian) decision models for determining the optimal life test sampling plans with an aim of cost minimization by identifying the appropriate number of product failures in a sample that should be used as a threshold in judging the rejection of a batch. The two-parameter exponential and Weibull distributions with two unknown parameters are assumed to be appropriate for modelling the lifetime of a product. A practical numerical application is employed to demonstrate the proposed approach.

  13. Validation of a sampling plan to generate food composition data.

    PubMed

    Sammán, N C; Gimenez, M A; Bassett, N; Lobo, M O; Marcoleri, M E

    2016-02-15

    A methodology to develop systematic plans for food sampling was proposed. Long life whole and skimmed milk, and sunflower oil were selected to validate the methodology in Argentina. Fatty acid profile in all foods, proximal composition, and calcium's content in milk were determined with AOAC methods. The number of samples (n) was calculated applying Cochran's formula with variation coefficients ⩽12% and an estimate error (r) maximum permissible ⩽5% for calcium content in milks and unsaturated fatty acids in oil. n were 9, 11 and 21 for long life whole and skimmed milk, and sunflower oil respectively. Sample units were randomly collected from production sites and sent to labs. Calculated r with experimental data was ⩽10%, indicating high accuracy in the determination of analyte content of greater variability and reliability of the proposed sampling plan. The methodology is an adequate and useful tool to develop sampling plans for food composition analysis. Copyright © 2015 Elsevier Ltd. All rights reserved.

  14. Clogging and Cementation Caused by Calcium or Iron Biogrouts

    NASA Astrophysics Data System (ADS)

    Ivanov, V.; Chu, J.; Naeimi, M.

    2012-12-01

    Chemical grouts are often used to reduce the hydraulic conductivity of soil for seepage control purposes. However, chemical grouts can be expensive and environmentally unfriendly. Therefore, two new biogrouts were tested for their bioclogging and biocementation properties. The first was calcium-based biogrout, which contained urease-producing bacteria, calcium chloride and urea for the crystallization of calcite due to enzymatic hydrolysis of urea. The second was iron-based biogrout, which consisted of urease-producing bacteria, ferric chelate, and urea for the precipitation of ferric hydroxide and carbonate due to enzymatic hydrolysis of urea. The permeability of sand (P, 10^-5 m/s), treated with calcium-based biogrout, linearly decreased as a function of the content of precipitated calcium (C, % w/w) according to the following equation: P = 5.1 - 4.0 C. Meanwhile, the permeability of sand treated with iron-based biogrout dropped to 2.7x10^-6 m/s at content of precipitated iron (F, % w/w) about 0.35 % w/w , by the equation: P = 5.1 - 14.6 F , and then slowly decreased to 1.4x10^-7 m/s at content of precipitated iron 1.8% w/w by the following equation: P = 0.36 - 0.23F. Both biogrouts have approximately same efficiency in the reduction of permeability of sand to low values. However, the mechanisms of bioclogging are probably different because the reduction of permeability by calcium-based biogrout was described by linear function of precipitated calcium but the reduction of permeability by iron-based biogrout showed two steps of the clogging. Different functions and mechanisms were related probably to the different type of precipitates. The images of biogrouted sand samples show that calcium-based biogrout produced white amorphous or crystallised calcium carbonate, while iron-based biogrout produced gel-like brown precipitate without visible crystals. The unconfined compressive strengths of the sand treated with different biogrouts (Y, kPa) increased by power function of the precipitated metal content (X, % ww-1) according to the following equations: Y = 14.7X^2 -0.72 X for calcium-based biogrout, and Y = 13.6X^2 + 37.0 X for iron-based biogrout. The strength of wet biocemented sand at the content of precipitated metals below 1.5 % w/w was very low and only at the content of precipitated metal above 3% w/w it was increased to 230 - 240 kPa. Therefore, major geotechnical applications of calcium-based and iron-based biogrouts at the contents of the precipitated metal below 1.5% could be bioclogging of the porous soil rather than its strengthening. This bioclogging could be applicable to the sealing the aquaculture or wastewater treatment ponds, construction of the algal biofuel production ponds, landfill sites, as well as for the plugging of the piping in dams, retaining walls, channels or reservoirs in sandy soil.

  15. 300 Area process trench sediment analysis report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zimmerman, M.G.; Kossik, C.D.

    1987-12-01

    This report describes the results of a sampling program for the sediments underlying the Process Trenches serving the 300 Area on the Hanford reservation. These Process Trenches were the subject of a Closure Plan submitted to the Washington State Department of Ecology and to the US Environmental Protection Agency in lieu of a Part B permit application on November 8, 1985. The closure plan described a proposed sampling plan for the underlying sediments and potential remedial actions to be determined by the sample analyses results. The results and proposed remedial action plan are presented and discussed in this report. 50more » refs., 6 figs., 8 tabs.« less

  16. Curating NASA's Astromaterials Collections: Past, Present, and Future

    NASA Technical Reports Server (NTRS)

    Zeigler, Ryan

    2015-01-01

    Planning for the curation of samples from future sample return missions must begin during the initial planning stages of a mission. Waiting until the samples have been returned to Earth, or even when you begin to physically build the spacecraft is too late. A lack of proper planning could lead to irreversible contamination of the samples, which in turn would compromise the scientific integrity of the mission. For example, even though the Apollo missions first returned samples in 1969, planning for the curation facility began in the early 1960s, and construction of the Lunar Receiving Laboratory was completed in 1967. In addition to designing the receiving facility and laboratory that the samples will be characterized and stored in, there are many aspects of contamination that must be addressed during the planning and building of the spacecraft: planetary protection (both outbound and inbound); cataloging, documenting, and preserving the materials used to build spacecraft (also known as coupons); near real-time monitoring of the environment in which the spacecraft is being built using witness plates for critical aspects of contamination (known as contamination control); and long term monitoring and preservation of the environment in which the spacecraft is being built for most aspects of potential contamination through the use of witness plates (known as contamination knowledge). The OSIRIS REx asteroid sample return mission, currently being built, is dealing with all of these aspects of contamination in order to ensure they return the best preserved sample possible. Coupons and witness plates from OSIRIS REx are currently being studied and stored (for future studies) at the Johnson Space Center. Similarly, planning for the clean room facility at Johnson Space Center to house the OSIRIS-REx samples is well advanced, and construction of the facility should begin in early 2017 (despite a nominal 2023 return date for OSIRIS-REx samples). Similar development is being done, in concert with JAXA, for the return of Hayabusa 2 samples (nominally in 2020). We are also actively developing advanced techniques like cold curation and organically clean curation in anticipation of future sample return missions such as comet nucleus sample return and Mars sample return.

  17. Remedial Investigation Work Plan for Upper East Fork Poplar Creek Operable Unit 3 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. Environmental Restoration Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-08-01

    Upper East Fork Popular Creek Operable Unit 3 (UEFPC OU 3) is a source term OU composed of seven sites, and is located in the western portion of the Y-12 Plant. For the most part, the UEFPC OU 3 sites served unrelated purposes and are geographically removed from one another. The seven sites include the following: Building 81-10, the S-2 Site, Salvage Yard oil storage tanks, the Salvage Yard oil/solvent drum storage area, Tank Site 2063-U, the Salvage Yard drum deheader, and the Salvage Yard scrap metal storage area. All of these sites are contaminated with at least one ormore » more hazardous and/or radioactive chemicals. All sites have had some previous investigation under the Y-12 Plant RCRA Program. The work plan contains summaries of geographical, historical, operational, geological, and hydrological information specific to each OU 3 site. The potential for release of contaminants to receptors through various media is addressed, and a sampling and analysis plan is presented to obtain objectives for the remedial investigation. Proposed sampling activities are contingent upon the screening level risk assessment, which includes shallow soil sampling, soil borings, monitoring well installation, groundwater sampling, and surface water sampling. Data from the site characterization activities will be used to meet the above objectives. A Field Sampling Investigation Plan, Health and Safety Plan, and Waste Management Plan are also included in this work plan.« less

  18. Planning Resource Guide.

    ERIC Educational Resources Information Center

    RP Group of California Community Colleges, Santa Ana.

    The Planning Resource Guide by the RP Group of California Community Colleges was created to provide practical planning assistance. It contains four sections, including: (1) a basic conceptual framework for planning; (2) common planning definitions for colleges; (3) planning steps and samples of planning structures; and (4) suggestions for linking…

  19. Data Validation Package - June 2016 Groundwater and Surface Water Sampling at the Green River, Utah, Disposal Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Linard, Joshua; Price, Jeffrey

    This event included annual sampling of groundwater and surface water locations at the Green River, Utah, Disposal Site. Sampling and analyses were conducted as specified in Sampling and Analysis Plan for US. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lrnldownloads/sampling-and- analysis-plan-us-department-energy-office-legacy-management-sites). Samples were collected from 15 monitoring wells and two surface locations at the disposal site as specified in the draft 2011 Ground Water Compliance Action Plan for the Green River, Utah, Disposal Site. Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. A duplicate sample was collected from location 0179. Onemore » equipment blank was collected during this sampling event. Water levels were measured at all monitoring wells that were sampled. See Attachment 2, Trip Reports for additional details. The analytical data and associated qualifiers can be viewed in environmental database reports and are also available for viewing with dynamic mapping via the GEMS (Geospatial Environmental Mapping System) website at http://gems.lm.doe.gov/#. No issues were identified during the data validation process that requires additional action or follow-up.« less

  20. 2018 Annual Terrestrial Sampling Plan for Sandia National Laboratories/New Mexico on Kirtland Air Force Base.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Griffith, Stacy R.

    The 2018 Annual Terrestrial Sampling Plan for Sandia National Laboratories/New Mexico on Kirtland Air Force Base has been prepared in accordance with the “Letter of Agreement Between Department of Energy, National Nuclear Security Administration, Sandia Field Office (DOE/NNSA/SFO) and 377th Air Base Wing (ABW), Kirtland Air Force Base (KAFB) for Terrestrial Sampling” (signed January 2017), Sandia National Laboratories, New Mexico (SNL/NM). The Letter of Agreement requires submittal of an annual terrestrial sampling plan.

  1. 2017 Annual Terrestrial Sampling Plan for Sandia National Laboratories/New Mexico on Kirtland Air Force Base

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Griffith, Stacy R.

    The 2017 Annual Terrestrial Sampling Plan for Sandia National Laboratories/New Mexico on Kirtland Air Force Base has been prepared in accordance with the “Letter of Agreement Between Department of Energy, National Nuclear Security Administration, Sandia Field Office (DOE/NNSA/SFO) and 377th Air Base Wing (ABW), Kirtland Air Force Base (KAFB) for Terrestrial Sampling” (signed January 2017), Sandia National Laboratories, New Mexico (SNL/NM). The Letter of Agreement requires submittal of an annual terrestrial sampling plan.

  2. ANALYSIS RESULTS FOR BUILDING 241 702-AZ A TRAIN

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DUNCAN JB; FRYE JM; COOKE CA

    2006-12-13

    This report presents the analyses results for three samples obtained under RPP-PLAN-28509, Sampling and Analysis Plan for Building 241 702-AZ A Train. The sampling and analysis was done in response to problem evaluation request number PER-2004-6139, 702-AZ Filter Rooms Need Radiological Cleanup Efforts.

  3. Black Family Planning: Attitudes of Leaders and a General Sample.

    ERIC Educational Resources Information Center

    Harris, William G.; And Others

    Attitudes of black leaders and a general black population sample toward birth control and family planning issues were "Pro Birth Control" and "Genocide Fears." The leaders questioned held positions in twenty national black organizations, while the general population samples were taken from Philadelphia, Pennsylvania, and Charlotte, North Carolina.…

  4. Master plans for pedestrian and bicycle transportation: community characteristics.

    PubMed

    Steinman, Lesley; Doescher, Mark; Levinger, David; Perry, Cynthia; Carter, Louise; Eyler, Amy; Aytur, Semra; Cradock, Angie L I; Evenson, Kelly R; Heinrich, Katie; Kerr, Jacqueline; Litt, Jill; Severcan, Yucel; Voorhees, Carolyn

    2010-03-01

    Recent research demonstrates the importance of targeting the built environment to support individual physical activity, particularly for people experiencing health disparities. Master plans to promote biking and/or pedestrians (BPMPs) are a potential method for environmental change. This descriptive study aims to provide a snapshot of plan attributes and better understand demographic, social and transportation characteristics of communities with BPMPs. We collected a census sample of BPMPs from 4 states. Population and commuting data were obtained from national statistics. 294 master plans were included, with most plans representing municipalities. 62% of plans targeted biking only, one-fifth targeted biking and walking, and 15% targeted walking only. The sampled locations have a similar demographic profile as the overall U.S. for median age and household income, people of color, high school education, and income inequality. The degree of racial diversity of sampled communities is slightly less than the U.S. average and the percentage of people who walk to work were slightly higher. Given that communities with master plans have a similar profile as the overall U.S., BPMPs could feasibly be spread to communities throughout the country. Further research is planned to describe BPMPs in detail toward informing future plan development.

  5. Containment Prospectus for the TRUMPET Experiments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pawloski, G A

    2004-02-05

    TRUMPET is a series of dynamic subcritical experiments planned for execution in the U1a.102D alcove of the U1a Complex at the Nevada Test Site (NTS). The location of LLNL drifts at the U1a Complex is shown in Figure 1. The data from the TRUMPET experiments will be used in the Stockpile Stewardship Program to assess the aging of nuclear weapons components and to better model the long-term performance of weapons in the enduring stockpile. The TRUMPET series of experiments will be conducted in an almost identical way as the OBOE series of experiments. Individual TRUMPET experiments will be housed inmore » an experiment vessel, as was done for OBOE. These vessels are the same as those utilized for OBOE. All TRUMPET experiments will occur in the zero room in the U1a.102D alcove, which is on the opposite side of the U1a.102 drift from U1a.102C, which housed the OBOE experiments. The centerlines of these two alcoves are separated by only 10 feet. As with OBOE experiments, expended TRUMPET experiment vessels will be moved to the back of the alcove and entombed in grout. After the TRUMPET series of experiments is completed, another experiment will be sited in the U1a.102D alcove and it will be the final experiment in the zero room, as was similarly done for the OBOE series of experiments followed by the execution of the PIANO experiment. Each experimental package for TRUMPET will be composed of high explosive (HE) and special nuclear material (SNM) in a subcritical assembly. Each experimental package will be placed in an experimental vessel within the TRUMPET zero room in the U1a.102D alcove. The containment plan for the TRUMPET experiments utilizes a two-nested containment vessel concept, similar to OBOE and other subcritical experiments in the U1a Complex. The first containment vessel is formed by the primary containment barrier that seals the U1a.102D drift. The second containment vessel is formed by the secondary containment barrier in the U1a.100 drift. While it is likely that the experiment vessel will contain the SNM from the experiment, the containment plan for the TRUMPET experiments only assumes that the experiment vessel provides shock mitigation and serves as a sink for the heat produced by the detonation of the HE. It is possible that one or more of the experiment vessels may seep SNM into the zero room from a failure of a seal on the vessel. This containment plan covers the entire series of TRUMPET experiments. At this time, we don't know exactly how many experiments will actually be conducted in the TRUMPET series. However, we know that the maximum planned number of experiments in the TRUMPET series is 20. This number may be modified on the basis of results obtained from each TRUMPET experiment. After the final experiment in the TRUMPET series is completed, a larger experiment will be conducted in the U1a.102D alcove. A separate containment plan will be developed and presented to the Containment Review Panel (CRP) for that larger experiment. As with OBOE, this containment plan is intended to cover all TRUMPET experiments. We will not develop a separate containment plan for each experiment. Before each experiment we will present a statement to the CRP that each TRUMPET experiment falls within the parameters presented in this document. If an experiment falls outside the parameters in this document, a containment plan for that experiment will be developed and presented to the CRP for a full containment review.« less

  6. Norfolk Lake Highway Bridges, Baxter County, Arkansas, White River and Tributaries, North Fork River, Arkansas Foundation Report.

    DTIC Science & Technology

    1983-06-01

    50 19 F20 mi mune d o f Cry-o Hadboto swi ve I I OL~~ Hzr Har Str 5 -45 H0 Back on !4rpn -USANDY DOLQ-1rrE - Vod ’og - 2 R r Ard - ard ---5 2 r...t OFOPALC70 * C",.. 0E- ** 36.78 1466.581 R~ktt I lrAtI- SAND Str 33 19 Is.. /2 mn CEIMnq GROUT - - 1 1M *-..dd Rou. 156:22 Stem Ke 465.4 /-yecg...FCAO O . . - L o ’ str Woeror e E.-IS 533.4’ I0 Rate cont L C , Dolomite - Grey - Hard 21 nd 17rpm 57. - Silic Kelly & DH Ass: 532.9’ 50 10.2 -S, -a’i

  7. X-ray computed tomography datasets for forensic analysis of vertebrate fossils.

    PubMed

    Rowe, Timothy B; Luo, Zhe-Xi; Ketcham, Richard A; Maisano, Jessica A; Colbert, Matthew W

    2016-06-07

    We describe X-ray computed tomography (CT) datasets from three specimens recovered from Early Cretaceous lakebeds of China that illustrate the forensic interpretation of CT imagery for paleontology. Fossil vertebrates from thinly bedded sediments often shatter upon discovery and are commonly repaired as amalgamated mosaics grouted to a solid backing slab of rock or plaster. Such methods are prone to inadvertent error and willful forgery, and once required potentially destructive methods to identify mistakes in reconstruction. CT is an efficient, nondestructive alternative that can disclose many clues about how a specimen was handled and repaired. These annotated datasets illustrate the power of CT in documenting specimen integrity and are intended as a reference in applying CT more broadly to evaluating the authenticity of comparable fossils.

  8. X-ray computed tomography datasets for forensic analysis of vertebrate fossils

    PubMed Central

    Rowe, Timothy B.; Luo, Zhe-Xi; Ketcham, Richard A.; Maisano, Jessica A.; Colbert, Matthew W.

    2016-01-01

    We describe X-ray computed tomography (CT) datasets from three specimens recovered from Early Cretaceous lakebeds of China that illustrate the forensic interpretation of CT imagery for paleontology. Fossil vertebrates from thinly bedded sediments often shatter upon discovery and are commonly repaired as amalgamated mosaics grouted to a solid backing slab of rock or plaster. Such methods are prone to inadvertent error and willful forgery, and once required potentially destructive methods to identify mistakes in reconstruction. CT is an efficient, nondestructive alternative that can disclose many clues about how a specimen was handled and repaired. These annotated datasets illustrate the power of CT in documenting specimen integrity and are intended as a reference in applying CT more broadly to evaluating the authenticity of comparable fossils. PMID:27272251

  9. In-situ measurement system

    DOEpatents

    Lord, David E.

    1983-01-01

    A multipurpose in situ underground measurement system comprising a plurality of long electrical resistance elements in the form of rigid reinforcing bars, each having an open loop "hairpin" configuration of shorter length than the other resistance elements. The resistance elements are arranged in pairs in a unitized structure, and grouted in place in the underground volume. The electrical resistance of each element and the difference in electrical resistance of the paired elements are obtained, which difference values may be used in analytical methods involving resistance as a function of temperature. A scanner sequentially connects the resistance-measuring apparatus to each individual pair of elements. A source of heating current is also selectively connectable for heating the elements to an initial predetermined temperature prior to electrical resistance measurements when used as an anemometer.

  10. Quantification of the Spatial Distribution of Radionuclides in Field Lysimeters with a Collimated High-Resolution Gamma-Ray Spectrometer

    NASA Astrophysics Data System (ADS)

    Erdmann, Bryan James

    The objective of this work is to quantify the one-dimensional spatial distribution of radionuclides in field lysimeters from the Radionuclide Field Lysimeter Experiment (RadFLEX) facility at the Savannah River Nationals Laboratory (SRNL). The lysimeters, containing 137Cs, 60Co, 133Ba and 152Eu incorporated either into solid wasteforms (Portland cement and reducing grout) or introduced into soil via a filter paper wasteform, were weathered for three to four years. The initial contaminant activities range from 4.0 to 9.0 MBq for the cementitious wasteforms and 0.25 to 0.47 MBq for the filter paper wasteform. An analytical method was developed to perform non-destructive measurements to quantify the spatial distributions measured in field lysimeters. This method provides an alternative to traditional destructive techniques to determine the spatial distribution of activity. This non-destructive method also allows for multiple scans to be performed periodically. Observing how these distributions change with time would improve modeling transport parameters. The detection system consists of a collimated high-purity germanium (HPGe) radiation detector coupled with a linear translational table. A lead collimator is used to achieve spatial resolution as high as 0.25 cm. The lysimeters are positioned relative to the detector using a linear translation stage that can move vertically via a computercontrolled stepping motor. A user control interface was developed with National Instruments LabVIEWRTM that synchronizes the data acquisition from the radiation detector with the lysimeter movement and positioning thus allowing the lysimeter scans to be automated. The detection efficiency of the system was investigated using two methods. Europium-152 is an ideal candidate for calibration source due to its multiple gamma-ray emissions across a wide range of energies. One method uses a 152Eu point source as the calibration standard while the other method uses the 152Eu within the lysimeter systems themselves as the calibration standard. These methods show that system geometry and source distribution are the key factors influencing the detection efficiency. This suggest that to reduce the impact from the source distribution and geometry variability within a volume, that lysimeters be rotated during measurements. These scans showed downward mobility of 60Co and 133Ba when the radionuclides were incorporated directly into the Savannah River Site (SRS) soil via the filter paper wasteform. When radionuclides were incorporated into the cementitious wasteforms positioned in the SRSS soil, 137Cs exhibited both upward and downward dispersion while the other radionuclides showed no movement. This dispersion was more significant for the Portland cement than the reducing grout wasteform. In the case of the filter paper wasteform, 137Cs mobility was greatly reduced. This suggests the presence of a cementitious wasteform enhances 137Cs mobility. The movement of 137Cs from the solid wasteform was modelled using a retarded diffusion model. Retardation factors for 137Cs are determined to range from approximately 700-2500 for Portland cement, 1500-4000 for reducing grout, and up to 2500-8000 the filter paper wasteform. Numerical simulations were run to investigate the hypothesis that ions released from the wasteforms compete for sorption sites in the SRS soil, enhancing the mobility of 137Cs. These simulations suggest ion-competition could be a factor, but more data is needed to explore this mechanism for Cs+ transport. Understanding radionuclide movement in the environment is important for informing strategies used for waste management and disposal.

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    In the Bear Creek Valley Watershed Remedial Investigation, the Boneyard/Burnyard was identified as the source of the largest releases of uranium into groundwater and surface water in Bear Creek Valley. The proposed action for remediation of this site is selective excavation and removal of source material and capping of the remainder of the site. The schedule for this action has been accelerated so that this is the first remedial action planned to be implemented in the Bear Creek Valley Record of Decision. Additional data needs to support design of the remedial action were identified at a data quality objectives meetingmore » held for this project. Sampling at the Boneyard/Burnyard will be conducted through the use of a phased approach. Initial or primary samples will be used to make in-the-field decisions about where to locate follow-up or secondary samples. On the basis of the results of surface water, soil, and groundwater analysis, up to six test pits will be dug. The test pits will be used to provide detailed descriptions of source materials and bulk samples. This document sets forth the requirements and procedures to protect the personnel involved in this project. This document also contains the health and safety plan, quality assurance project plan, waste management plan, data management plan, implementation plan, and best management practices plan for this project as appendices.« less

  12. Field Sampling Plan/Quality Assurance Project Plan Volume I of III

    EPA Pesticide Factsheets

    This document contains procedures related to the collection and analysis of soil, sediment, groundwater, surface water, air and biota samples at GE’s Pittsfield, Massachusetts facility and at other areas.

  13. Asteroid Redirect Mission: EVA and Sample Collection

    NASA Technical Reports Server (NTRS)

    Abell, Paul; Stich, Steve

    2015-01-01

    Asteroid Redirect Mission (ARM) Overview (1) Notional Development Schedule, (2) ARV Crewed Mission Accommodations; Asteroid Redirect Crewed Mission (ARCM) Mission Summary; ARCM Accomplishments; Sample collection/curation plan (1) CAPTEM Requirements; SBAG Engagement Plan

  14. Sample transportation management plans and templates.

    DOT National Transportation Integrated Search

    2010-08-01

    This Guide consisting of samples, templates, and tips is designed to help transportation agencies with the : development and implementation of their own Transportation Management Plans (TMPs). Understanding : the work zone impacts is critical to deve...

  15. Implementing reduced-risk integrated pest management in fresh-market cabbage: influence of sampling parameters, and validation of binomial sequential sampling plans for the cabbage looper (Lepidoptera Noctuidae).

    PubMed

    Burkness, Eric C; Hutchison, W D

    2009-10-01

    Populations of cabbage looper, Trichoplusiani (Lepidoptera: Noctuidae), were sampled in experimental plots and commercial fields of cabbage (Brasicca spp.) in Minnesota during 1998-1999 as part of a larger effort to implement an integrated pest management program. Using a resampling approach and the Wald's sequential probability ratio test, sampling plans with different sampling parameters were evaluated using independent presence/absence and enumerative data. Evaluations and comparisons of the different sampling plans were made based on the operating characteristic and average sample number functions generated for each plan and through the use of a decision probability matrix. Values for upper and lower decision boundaries, sequential error rates (alpha, beta), and tally threshold were modified to determine parameter influence on the operating characteristic and average sample number functions. The following parameters resulted in the most desirable operating characteristic and average sample number functions; action threshold of 0.1 proportion of plants infested, tally threshold of 1, alpha = beta = 0.1, upper boundary of 0.15, lower boundary of 0.05, and resampling with replacement. We found that sampling parameters can be modified and evaluated using resampling software to achieve desirable operating characteristic and average sample number functions. Moreover, management of T. ni by using binomial sequential sampling should provide a good balance between cost and reliability by minimizing sample size and maintaining a high level of correct decisions (>95%) to treat or not treat.

  16. HYPERSAMP - HYPERGEOMETRIC ATTRIBUTE SAMPLING SYSTEM BASED ON RISK AND FRACTION DEFECTIVE

    NASA Technical Reports Server (NTRS)

    De, Salvo L. J.

    1994-01-01

    HYPERSAMP is a demonstration of an attribute sampling system developed to determine the minimum sample size required for any preselected value for consumer's risk and fraction of nonconforming. This statistical method can be used in place of MIL-STD-105E sampling plans when a minimum sample size is desirable, such as when tests are destructive or expensive. HYPERSAMP utilizes the Hypergeometric Distribution and can be used for any fraction nonconforming. The program employs an iterative technique that circumvents the obstacle presented by the factorial of a non-whole number. HYPERSAMP provides the required Hypergeometric sample size for any equivalent real number of nonconformances in the lot or batch under evaluation. Many currently used sampling systems, such as the MIL-STD-105E, utilize the Binomial or the Poisson equations as an estimate of the Hypergeometric when performing inspection by attributes. However, this is primarily because of the difficulty in calculation of the factorials required by the Hypergeometric. Sampling plans based on the Binomial or Poisson equations will result in the maximum sample size possible with the Hypergeometric. The difference in the sample sizes between the Poisson or Binomial and the Hypergeometric can be significant. For example, a lot size of 400 devices with an error rate of 1.0% and a confidence of 99% would require a sample size of 400 (all units would need to be inspected) for the Binomial sampling plan and only 273 for a Hypergeometric sampling plan. The Hypergeometric results in a savings of 127 units, a significant reduction in the required sample size. HYPERSAMP is a demonstration program and is limited to sampling plans with zero defectives in the sample (acceptance number of zero). Since it is only a demonstration program, the sample size determination is limited to sample sizes of 1500 or less. The Hypergeometric Attribute Sampling System demonstration code is a spreadsheet program written for IBM PC compatible computers running DOS and Lotus 1-2-3 or Quattro Pro. This program is distributed on a 5.25 inch 360K MS-DOS format diskette, and the program price includes documentation. This statistical method was developed in 1992.

  17. 75 FR 43989 - Agency Information Collection Activities; Proposed Collection; Comment Request; Sample Collection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-27

    ... for Dogs Treated With SLENTROL AGENCY: Food and Drug Administration, HHS. ACTION: Notice. SUMMARY: The... on the sample collection plan for dogs treated with the drug SLENTROL. DATES: Submit either... technology. Sample Collection Plan for Dogs Treated With SLENTROL--21 CFR 514.80 (OMB Control Number 0910-NEW...

  18. Inspection error and its adverse effects - A model with implications for practitioners

    NASA Technical Reports Server (NTRS)

    Collins, R. D., Jr.; Case, K. E.; Bennett, G. K.

    1978-01-01

    Inspection error has clearly been shown to have adverse effects upon the results desired from a quality assurance sampling plan. These effects upon performance measures have been well documented from a statistical point of view. However, little work has been presented to convince the QC manager of the unfavorable cost consequences resulting from inspection error. This paper develops a very general, yet easily used, mathematical cost model. The basic format of the well-known Guthrie-Johns model is used. However, it is modified as required to assess the effects of attributes sampling errors of the first and second kind. The economic results, under different yet realistic conditions, will no doubt be of interest to QC practitioners who face similar problems daily. Sampling inspection plans are optimized to minimize economic losses due to inspection error. Unfortunately, any error at all results in some economic loss which cannot be compensated for by sampling plan design; however, improvements over plans which neglect the presence of inspection error are possible. Implications for human performance betterment programs are apparent, as are trade-offs between sampling plan modification and inspection and training improvements economics.

  19. Quality-assurance plan for the analysis of suspended sediment by the U.S. Geological Survey in Montana

    USGS Publications Warehouse

    Dodge, Kent A.; Lambing, John H.

    2006-01-01

    A quality-assurance plan has been developed for use by the sediment laboratory of the U.S. Geological Survey Montana Water Science Center in conducting activities related to the analysis of suspended sediment. The plan documents quality-assurance policies for sediment-laboratory certification, personnel responsibilities and training, documentation requirements, and laboratory safety. The plan also documents quality-assurance procedures related to laboratory equipment and supplies, sample management, sample analysis, analytical quality control, and data management.

  20. Planning Considerations Related to Collecting and Analyzing Samples of the Martian Soils

    NASA Technical Reports Server (NTRS)

    Liu, Yang; Mellon, Mike T.; Ming, Douglas W.; Morris, Richard V.; Noble, Sarah K.; Sullivan, Robert J.; Taylor, Lawrence A.; Beaty, David W.

    2014-01-01

    The Mars Sample Return (MSR) End-to-End International Science Analysis Group (E2E-iSAG [1]) established scientific objectives associ-ated with Mars returned-sample science that require the return and investigation of one or more soil samples. Soil is defined here as loose, unconsolidated materials with no implication for the presence or absence of or-ganic components. The proposed Mars 2020 (M-2020) rover is likely to collect and cache soil in addition to rock samples [2], which could be followed by future sample retrieval and return missions. Here we discuss key scientific consid-erations for sampling and caching soil samples on the proposed M-2020 rover, as well as the state in which samples would need to be preserved when received by analysts on Earth. We are seeking feedback on these draft plans as input to mission requirement formulation. A related planning exercise on rocks is reported in an accompanying abstract [3].

  1. IP Sample Plan #5 | NCI Technology Transfer Center | TTC

    Cancer.gov

    A sample Intellectual Property Management Plan in the form of a legal agreement between a University and its collaborators which addresses data sharing, sharing of research tools and resources and intellectual property management.

  2. Assumptions of acceptance sampling and the implications for lot contamination: Escherichia coli O157 in lots of Australian manufacturing beef.

    PubMed

    Kiermeier, Andreas; Mellor, Glen; Barlow, Robert; Jenson, Ian

    2011-04-01

    The aims of this work were to determine the distribution and concentration of Escherichia coli O157 in lots of beef destined for grinding (manufacturing beef) that failed to meet Australian requirements for export, to use these data to better understand the performance of sampling plans based on the binomial distribution, and to consider alternative approaches for evaluating sampling plans. For each of five lots from which E. coli O157 had been detected, 900 samples from the external carcass surface were tested. E. coli O157 was not detected in three lots, whereas in two lots E. coli O157 was detected in 2 and 74 samples. For lots in which E. coli O157 was not detected in the present study, the E. coli O157 level was estimated to be <12 cells per 27.2-kg carton. For the most contaminated carton, the total number of E. coli O157 cells was estimated to be 813. In the two lots in which E. coli O157 was detected, the pathogen was detected in 1 of 12 and 2 of 12 cartons. The use of acceptance sampling plans based on a binomial distribution can provide a falsely optimistic view of the value of sampling as a control measure when applied to assessment of E. coli O157 contamination in manufacturing beef. Alternative approaches to understanding sampling plans, which do not assume homogeneous contamination throughout the lot, appear more realistic. These results indicate that despite the application of stringent sampling plans, sampling and testing approaches are inefficient for controlling microbiological quality.

  3. Site characterization summary report for dry weather surface water sampling upper East Fork Poplar Creek characterization area Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This report describes activities associated with conducting dry weather surface water sampling of Upper East Fork Poplar Creek (UEFPC) at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee. This activity is a portion of the work to be performed at UEFPC Operable Unit (OU) 1 [now known as the UEFPC Characterization Area (CA)], as described in the RCRA Facility Investigation Plan for Group 4 at the Oak- Ridge Y-12 Plant, Oak Ridge, Tennessee and in the Response to Comments and Recommendations on RCRA Facility Investigation Plan for Group 4 at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee, Volume 1,more » Operable Unit 1. Because these documents contained sensitive information, they were labeled as unclassified controlled nuclear information and as such are not readily available for public review. To address this issue the U.S. Department of Energy (DOE) published an unclassified, nonsensitive version of the initial plan, text and appendixes, of this Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) Plan in early 1994. These documents describe a program for collecting four rounds of wet weather and dry weather surface water samples and one round of sediment samples from UEFPC. They provide the strategy for the overall sample collection program including dry weather sampling, wet weather sampling, and sediment sampling. Figure 1.1 is a schematic flowchart of the overall sampling strategy and other associated activities. A Quality Assurance Project Plan (QAPJP) was prepared to specifically address four rounds of dry weather surface water sampling and one round of sediment sampling. For a variety of reasons, sediment sampling has not been conducted and has been deferred to the UEFPC CA Remedial Investigation (RI), as has wet weather sampling.« less

  4. It's Time to Develop a New "Draft Test Protocol" for a Mars Sample Return Mission (or Two…).

    PubMed

    Rummel, John D; Kminek, Gerhard

    2018-04-01

    The last time NASA envisioned a sample return mission from Mars, the development of a protocol to support the analysis of the samples in a containment facility resulted in a "Draft Test Protocol" that outlined required preparations "for the safe receiving, handling, testing, distributing, and archiving of martian materials here on Earth" (Rummel et al., 2002 ). This document comprised a specific protocol to be used to conduct a biohazard test for a returned martian sample, following the recommendations of the Space Studies Board of the US National Academy of Sciences. Given the planned launch of a sample-collecting and sample-caching rover (Mars 2020) in 2 years' time, and with a sample return planned for the end of the next decade, it is time to revisit the Draft Test Protocol to develop a sample analysis and biohazard test plan to meet the needs of these future missions. Key Words: Biohazard detection-Mars sample analysis-Sample receiving facility-Protocol-New analytical techniques-Robotic sample handling. Astrobiology 18, 377-380.

  5. Determination of the influence of dispersion pattern of pesticide-resistant individuals on the reliability of resistance estimates using different sampling plans.

    PubMed

    Shah, R; Worner, S P; Chapman, R B

    2012-10-01

    Pesticide resistance monitoring includes resistance detection and subsequent documentation/ measurement. Resistance detection would require at least one (≥1) resistant individual(s) to be present in a sample to initiate management strategies. Resistance documentation, on the other hand, would attempt to get an estimate of the entire population (≥90%) of the resistant individuals. A computer simulation model was used to compare the efficiency of simple random and systematic sampling plans to detect resistant individuals and to document their frequencies when the resistant individuals were randomly or patchily distributed. A patchy dispersion pattern of resistant individuals influenced the sampling efficiency of systematic sampling plans while the efficiency of random sampling was independent of such patchiness. When resistant individuals were randomly distributed, sample sizes required to detect at least one resistant individual (resistance detection) with a probability of 0.95 were 300 (1%) and 50 (10% and 20%); whereas, when resistant individuals were patchily distributed, using systematic sampling, sample sizes required for such detection were 6000 (1%), 600 (10%) and 300 (20%). Sample sizes of 900 and 400 would be required to detect ≥90% of resistant individuals (resistance documentation) with a probability of 0.95 when resistant individuals were randomly dispersed and present at a frequency of 10% and 20%, respectively; whereas, when resistant individuals were patchily distributed, using systematic sampling, a sample size of 3000 and 1500, respectively, was necessary. Small sample sizes either underestimated or overestimated the resistance frequency. A simple random sampling plan is, therefore, recommended for insecticide resistance detection and subsequent documentation.

  6. Closure Report for Corrective Action Unit 166: Storage Yards and Contaminated Materials, Nevada Test Site, Nevada

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NSTec Environmental Restoration

    2009-08-01

    Corrective Action Unit (CAU) 166 is identified in the Federal Facility Agreement and Consent Order (FFACO) as 'Storage Yards and Contaminated Materials' and consists of the following seven Corrective Action Sites (CASs), located in Areas 2, 3, 5, and 18 of the Nevada Test Site: CAS 02-42-01, Condo Release Storage Yd - North; CAS 02-42-02, Condo Release Storage Yd - South; CAS 02-99-10, D-38 Storage Area; CAS 03-42-01, Conditional Release Storage Yard; CAS 05-19-02, Contaminated Soil and Drum; CAS 18-01-01, Aboveground Storage Tank; and CAS 18-99-03, Wax Piles/Oil Stain. Closure activities were conducted from March to July 2009 according tomore » the FF ACO (1996, as amended February 2008) and the Corrective Action Plan for CAU 166 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office, 2007b). The corrective action alternatives included No Further Action and Clean Closure. Closure activities are summarized. CAU 166, Storage Yards and Contaminated Materials, consists of seven CASs in Areas 2, 3, 5, and 18 of the NTS. The closure alternatives included No Further Action and Clean Closure. This CR provides a summary of completed closure activities, documentation of waste disposal, and confirmation that remediation goals were met. The following site closure activities were performed at CAU 166 as documented in this CR: (1) At CAS 02-99-10, D-38 Storage Area, approximately 40 gal of lead shot were removed and are currently pending treatment and disposal as MW, and approximately 50 small pieces of DU were removed and disposed as LLW. (2) At CAS 03-42-01, Conditional Release Storage Yard, approximately 7.5 yd{sup 3} of soil impacted with lead and Am-241 were removed and disposed as LLW. As a BMP, approximately 22 ft{sup 3} of asbestos tile were removed from a portable building and disposed as ALLW, approximately 55 gal of oil were drained from accumulators and are currently pending disposal as HW, the portable building was removed and disposed as LLW, and accumulators, gas cylinders, and associated debris were removed and are currently pending treatment and disposal as MW. (3) At CAS 05-19-02, Contaminated Soil and Drum, as a BMP, an empty drum was removed and disposed as sanitary waste. (4) At CAS 18-01-01, Aboveground Storage Tank, approximately 165 gal of lead-impacted liquid were removed and are currently pending disposal as HW, and approximately 10 gal of lead shot and 6 yd{sup 3} of wax embedded with lead shot were removed and are currently pending treatment and disposal as MW. As a BMP, approximately 0.5 yd{sup 3} of wax were removed and disposed as hydrocarbon waste, approximately 55 gal of liquid were removed and disposed as sanitary waste, and two metal containers were grouted in place. (5) At CAS 18-99-03, Wax Piles/Oil Stain, no further action was required; however, as a BMP, approximately l.5 yd{sup 3} of wax were removed and disposed as hydrocarbon waste, and one metal container was grouted in place.« less

  7. 7 CFR 43.105 - Operating characteristics (OC) curves.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 43.105 Agriculture Regulations of the Department of Agriculture AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE COMMODITY STANDARDS AND STANDARD CONTAINER REGULATIONS STANDARDS FOR SAMPLING PLANS Sampling Plans § 43.105 Operating characteristics (OC...

  8. Nitrate Waste Treatment Sampling and Analysis Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vigil-Holterman, Luciana R.; Martinez, Patrick Thomas; Garcia, Terrence Kerwin

    2017-07-05

    This plan is designed to outline the collection and analysis of nitrate salt-bearing waste samples required by the New Mexico Environment Department- Hazardous Waste Bureau in the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit (Permit).

  9. A Rapid Decision Sampling Plan for Implementing Area—Wide Management of the Red Palm Weevil, Rhynchophorus ferrugineus, in Coconut Plantations of India

    PubMed Central

    Faleiro, J. R.; Ashok Kumar, J.

    2008-01-01

    The red palm weevil Rhynchophorus ferrugineus Olivier (Curculionidae/Rhynchophoridae/Dryophthoridae) is a lethal pest of young coconut palms, Cocos nucifera L. (Arecales: Arecaceae), with a highly aggregated population distribution pattern. R. ferrugineus is managed in several coconut growing countries using area-wide pheromone based programmes that need a substantial commitment of funds over a period of time. Often, decisions to implement area-wide management of R. ferrugineus are based on pheromone trap captures in surveillance traps and or infestation reports. Implementing area-wide management of this pest on the basis of such data can be inaccurate, as it may either under or over estimate the pest intensity in the field. This study presents sampling plans for rapid and accurate classification of R. ferrugineus infestation in coconut plantations of India by inspecting palms to detect infestation in a sequence until a decision to either implement or not to initiate area-wide management of R. ferrugineus can be made. The sampling plans are based on a common aggregation index of 3.45, assumed action threshold values of either 1.0 (plan A) or 0.5 (plan B) per cent infested palms and a risk factor of making the wrong decision set at 0.05. Using plans A and B, if the cummulative number of infested palms in a young 1 hectare coconut plantation is zero out of 150 palms for both plans, then area-wide management is not required, while on the other hand, if the cummulative number of infested palms for the same area is 6 (plan A), or 5 (plan B), then area-wide management of R. ferrugineus is essential. The proposed sampling plans are efficient tools in decision making, particularly at very low and high levels of infestation and can also be used to assess the performance of R. ferrugineus IPM programmes that are in progress. These plans not only save time and money as only a small area needs to be sampled to arrive at a correct decision, but are also efficient in rating the infestation level accurately. PMID:20337561

  10. A rapid decision sampling plan for implementing area-wide management of the red palm weevil, Rhynchophorus ferrugineus, in coconut plantations of India.

    PubMed

    Faleiro, J R; Ashok Kumar, J

    2008-01-01

    The red palm weevil Rhynchophorus ferrugineus Olivier (Curculionidae/Rhynchophoridae/Dryophthoridae) is a lethal pest of young coconut palms, Cocos nucifera L. (Arecales: Arecaceae), with a highly aggregated population distribution pattern. R. ferrugineus is managed in several coconut growing countries using area-wide pheromone based programmes that need a substantial commitment of funds over a period of time. Often, decisions to implement area-wide management of R. ferrugineus are based on pheromone trap captures in surveillance traps and or infestation reports. Implementing area-wide management of this pest on the basis of such data can be inaccurate, as it may either under or over estimate the pest intensity in the field. This study presents sampling plans for rapid and accurate classification of R. ferrugineus infestation in coconut plantations of India by inspecting palms to detect infestation in a sequence until a decision to either implement or not to initiate area-wide management of R. ferrugineus can be made. The sampling plans are based on a common aggregation index of 3.45, assumed action threshold values of either 1.0 (plan A) or 0.5 (plan B) per cent infested palms and a risk factor of making the wrong decision set at 0.05. Using plans A and B, if the cumulative number of infested palms in a young 1 hectare coconut plantation is zero out of 150 palms for both plans, then area-wide management is not required, while on the other hand, if the cumulative number of infested palms for the same area is 6 (plan A), or 5 (plan B), then area-wide management of R. ferrugineus is essential. The proposed sampling plans are efficient tools in decision making, particularly at very low and high levels of infestation and can also be used to assess the performance of R. ferrugineus IPM programmes that are in progress. These plans not only save time and money as only a small area needs to be sampled to arrive at a correct decision, but are also efficient in rating the infestation level accurately.

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reigel, M. M.; Fowley, M. D.; Pickenheim, B. R.

    A soft metal with low wear resistance (6000 series aluminum), was used to minimize run time while maximizing wear rate. Two paddle configurations were tested, with the first four paddles after the augers replaced by the wear paddles. The first configuration was all flat paddles, with the first paddle not aligned with the augers and is consistent with present SPF mixer. The second configuration had helical paddles for the first three stages after the augers and a flat paddle at the fourth stage. The first helical paddle was aligned with the auger flight for the second configuration. The all flatmore » paddle configuration wear rate was approximately double the wear rate of the helical paddles for the first two sets of paddles after the augers. For both configurations, there was little or no wear on the third and fourth paddle sets based on mass change, indicating that the fully wetted premix materials are much less abrasive than the un-wetted or partially wetted premix. Additionally, inspection of the wear surface of the paddles at higher magnification showed the flat paddles were worn much more than the helical and is consistent with the wear rates. Aligning the auger discharge flight with the first set of helical paddles was effective in reducing the wear rate as compared to the flat paddle configuration. Changing the paddle configuration from flat to helical resulted in a slight increase in rheological properties. Although, both tests produced grout-like material that is within the processing rage of the SPF, it should be noted that cement is not included in the premix and water was used rather than salt solution, which does affect the rheology of the fresh grout. The higher rheological properties from the helical wear test are most likely due to the reduced number of shearing paddles in the mixer. In addition, there is variation in the rheological data for each wear test. This is most likely due to the way that the dry feeds enter the mixer from the dry feeder. The premix is discharged from the hopper in an unsteady fashion, where irregular sized clumps were observed leaving the discharge of the auger, though the auger speed is constant.« less

  12. In-situ stressing of rock: Observation of infrared emission prior to failure

    NASA Astrophysics Data System (ADS)

    Dahlgren, R.; Freund, F. T.; Momayez, M.; Bleier, T. E.; Dunson, C.; Joggerst, P.; Jones, K.; Wang, S.

    2009-12-01

    Blocks of igneous rocks such as anorthosite and granite subjected at one end to uniaxial stress have been shown to emit a small but distinct excess amount of infrared (IR) light (Freund, F. T., et al, JASTP, 71, 2009). This anomalous IR emission arises from the radiative de-excitation of electron vacancy defects, which, upon stress-activation, flow into the unstressed portion and recombine at the surface. This non-thermal IR emission occurs in the 8 μm to 14 μm wavelength region. Field experiments are performed by slowly stressing large boulders and monitoring the IR emission in situ with a Bruker EM27 Fourier Transform Infrared (FTIR) spectrometer. The boulders are prepared by drilling four blind holes into the rock, 50-100 cm deep, in an array roughly parallel to, and behind, the surface from where the IR emission is monitored. Any debris and water is blown out of the boreholes with compressed air, and the rock is given time to dry and relax from drilling-induced stresses. The holes are then filled with grout that expands upon curing, creating an increasing radial pressure of up to 5 × 103 t/m2. The experiments were carried out with two large granite boulders, one of about 30 t of hard (over 150 MPa) granite at the University of Arizona’s Henry "Hank" Grunstedt San Xavier Mining Laboratory, located in the copper mining district near Tucson, AZ and the other of about 7 t of weathered granite in the Sierra Nevada foothills near Oakhurst, CA. The Bruker EM27 FTIR spectrometer equipped with a 20 cm reflective telescope collects the IR emission from a safe distance at a rate of a full 4-16 µm spectrum every 30 sec. After recording baseline data, the grout was mixed with water and poured into the holes as IR emission was monitored continuously until the experiment was terminated after rock failure. The time of failure is noted whenever the first acoustic or visual cues are sensed from the boulder. The IR data shows that after a period of quiescence, pronounced non-thermal IR emission is observed within minutes of the rock failure.

  13. Determining the release of radionuclides from tank waste residual solids. FY2015 report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    King, William D.; Hobbs, David T.

    Methodology development for pore water leaching studies has been continued to support Savannah River Site High Level Waste tank closure efforts. For FY2015, the primary goal of this testing was the achievement of target pH and Eh values for pore water solutions representative of local groundwater in the presence of grout or grout-representative (CaCO 3 or FeS) solids as well as waste surrogate solids representative of residual solids expected to be present in a closed tank. For oxidizing conditions representative of a closed tank after aging, a focus was placed on using solid phases believed to be controlling pH andmore » E h at equilibrium conditions. For three pore water conditions (shown below), the target pH values were achieved to within 0.5 pH units. Tank 18 residual surrogate solids leaching studies were conducted over an E h range of approximately 630 mV. Significantly higher Eh values were achieved for the oxidizing conditions (ORII and ORIII) than were previously observed. For the ORII condition, the target Eh value was nearly achieved (within 50 mV). However, E h values observed for the ORIII condition were approximately 160 mV less positive than the target. E h values observed for the RRII condition were approximately 370 mV less negative than the target. Achievement of more positive and more negative E h values is believed to require the addition of non-representative oxidants and reductants, respectively. Plutonium and uranium concentrations measured during Tank 18 residual surrogate solids leaching studies under these conditions (shown below) followed the general trends predicted for plutonium and uranium oxide phases, assuming equilibrium with dissolved oxygen. The highest plutonium and uranium concentrations were observed for the ORIII condition and the lowest concentrations were observed for the RRII condition. Based on these results, it is recommended that these test methodologies be used to conduct leaching studies with actual Tank 18 residual solids material. Actual waste testing will include leaching evaluations of technetium and neptunium, as well as plutonium and uranium.« less

  14. Final report: survey and removal of radioactive surface contamination at environmental restoration sites, Sandia National Laboratories/New Mexico. Volume 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lambert, K.A.; Mitchell, M.M.; Jean, D.

    1997-09-01

    This report contains the Appendices A-L including Voluntary Corrective Measure Plans, Waste Management Plans, Task-Specific Health and Safety Plan, Analytical Laboratory Procedures, Soil Sample Results, In-Situ Gamma Spectroscopy Results, Radionuclide Activity Summary, TCLP Soil Sample Results, Waste Characterization Memoranda, Waste Drum Inventory Data, Radiological Risk Assessment, and Summary of Site-Specific Recommendations.

  15. Remote Sensing for Inland Water Quality Monitoring: A U.S. Army Corps of Engineers Perspective

    DTIC Science & Technology

    2011-10-01

    outlined in Water Quality Management Plans , including traditional field sampling (water, sediment, and biological) and measure- ment of physical...at one time, a more comprehen- sive historical record or trend analysis, a planning tool for prioritizing field surveying and sampling, and accurate...estimations of optically active constituents used to characterize water quality. Furthermore, when utilized in water quality management planning

  16. Environmental Assessment for the Closure of the High-Level Waste Tanks in F- & H-Areas at the Savannah River Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    1996-07-31

    This Environmental Assessment (EA) has been prepared by the Department of Energy (DOE) to assess the potential environmental impacts associated with the closure of 51 high-level radioactive waste tanks and tank farm ancillary equipment (including transfer lines, evaporators, filters, pumps, etc) at the Savannah River Site (SRS) located near Aiken, South Carolina. The waste tanks are located in the F- and H-Areas of SRS and vary in capacity from 2,839,059 liters (750,000 gallons) to 4,921,035 liters (1,300,000 gallons). These in-ground tanks are surrounded by soil to provide shielding. The F- and H-Area High-Level Waste Tanks are operated under the authoritymore » of Industrial Wastewater Permits No.17,424-IW; No.14520, and No.14338 issued by the South Carolina Department of Health and Environmental Control (SCDHEC). In accordance with the Permit requirements, DOE has prepared a Closure Plan (DOE, 1996) and submitted it to SCDHEC for approval. The Closure Plan identifies all applicable or relevant and appropriate regulations, statutes, and DOE Orders for closing systems operated under the Industrial Wastewater Permits. When approved by SCDHEC, the Closure Plan will present the regulatory process for closing all of the F- and H-Area High Level Waste Tanks. The Closure Plan establishes performance objectives or criteria to be met prior to closing any tank, group of tanks, or ancillary tank farm equipment. The proposed action is to remove the residual wastes from the tanks and to fill the tanks with a material to prevent future collapse and bind up residual waste, to lower human health risks, and to increase safety in and around the tanks. If required, an engineered cap consisting of clay, backfill (soil), and vegetation as the final layer to prevent erosion would be applied over the tanks. The selection of tank system closure method will be evaluated against the following Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) criteria described in 40 CFR 300.430(e)(9): ( 1) overall protection of human health and the environment; (2) compliance with applicable or relevant and appropriated requirement: (ARARs); (3) long-term effectiveness and permanence; (4) reduction of toxicity, mobility, or volume through treatment; (5) short-term effectiveness; (6) implementability; (7) cost; (8) state acceptable; and (9) community acceptance. Closure of each tank involves two separate operations after bulk waste removal has been accomplished: (1) cleaning of the tank (i.e., removing the residual contaminants), and (2) the actual closure or filling of the tank with an inert material, (e.g., grout). This process would continue until all the tanks and ancillary equipment and systems have been closed. This is expected to be about year 2028 for Type I, II, and IV tanks and associated systems. Subsequent to that, Type III tanks and systems will be closed.« less

  17. Cache-Aware Asymptotically-Optimal Sampling-Based Motion Planning

    PubMed Central

    Ichnowski, Jeffrey; Prins, Jan F.; Alterovitz, Ron

    2014-01-01

    We present CARRT* (Cache-Aware Rapidly Exploring Random Tree*), an asymptotically optimal sampling-based motion planner that significantly reduces motion planning computation time by effectively utilizing the cache memory hierarchy of modern central processing units (CPUs). CARRT* can account for the CPU’s cache size in a manner that keeps its working dataset in the cache. The motion planner progressively subdivides the robot’s configuration space into smaller regions as the number of configuration samples rises. By focusing configuration exploration in a region for periods of time, nearest neighbor searching is accelerated since the working dataset is small enough to fit in the cache. CARRT* also rewires the motion planning graph in a manner that complements the cache-aware subdivision strategy to more quickly refine the motion planning graph toward optimality. We demonstrate the performance benefit of our cache-aware motion planning approach for scenarios involving a point robot as well as the Rethink Robotics Baxter robot. PMID:25419474

  18. Cache-Aware Asymptotically-Optimal Sampling-Based Motion Planning.

    PubMed

    Ichnowski, Jeffrey; Prins, Jan F; Alterovitz, Ron

    2014-05-01

    We present CARRT* (Cache-Aware Rapidly Exploring Random Tree*), an asymptotically optimal sampling-based motion planner that significantly reduces motion planning computation time by effectively utilizing the cache memory hierarchy of modern central processing units (CPUs). CARRT* can account for the CPU's cache size in a manner that keeps its working dataset in the cache. The motion planner progressively subdivides the robot's configuration space into smaller regions as the number of configuration samples rises. By focusing configuration exploration in a region for periods of time, nearest neighbor searching is accelerated since the working dataset is small enough to fit in the cache. CARRT* also rewires the motion planning graph in a manner that complements the cache-aware subdivision strategy to more quickly refine the motion planning graph toward optimality. We demonstrate the performance benefit of our cache-aware motion planning approach for scenarios involving a point robot as well as the Rethink Robotics Baxter robot.

  19. Sample-Based Motion Planning in High-Dimensional and Differentially-Constrained Systems

    DTIC Science & Technology

    2010-02-01

    Reachable Set . . . 88 6-1 LittleDog Robot . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 94 6-2 Dog bounding up stairs ...planning algorithm implemented on LittleDog, a quadruped robot . The motion planning algorithm successfully planned bounding trajectories over extremely...a motion planning algorithm implemented on LittleDog, a quadruped robot . The motion planning algorithm successfully planned bounding trajectories

  20. Machine learning from computer simulations with applications in rail vehicle dynamics

    NASA Astrophysics Data System (ADS)

    Taheri, Mehdi; Ahmadian, Mehdi

    2016-05-01

    The application of stochastic modelling for learning the behaviour of a multibody dynamics (MBD) models is investigated. Post-processing data from a simulation run are used to train the stochastic model that estimates the relationship between model inputs (suspension relative displacement and velocity) and the output (sum of suspension forces). The stochastic model can be used to reduce the computational burden of the MBD model by replacing a computationally expensive subsystem in the model (suspension subsystem). With minor changes, the stochastic modelling technique is able to learn the behaviour of a physical system and integrate its behaviour within MBD models. The technique is highly advantageous for MBD models where real-time simulations are necessary, or with models that have a large number of repeated substructures, e.g. modelling a train with a large number of railcars. The fact that the training data are acquired prior to the development of the stochastic model discards the conventional sampling plan strategies like Latin Hypercube sampling plans where simulations are performed using the inputs dictated by the sampling plan. Since the sampling plan greatly influences the overall accuracy and efficiency of the stochastic predictions, a sampling plan suitable for the process is developed where the most space-filling subset of the acquired data with ? number of sample points that best describes the dynamic behaviour of the system under study is selected as the training data.

Top