Installation Restoration Program Records Search for Des Moines Air National Guard Installation, Iowa
1983-09-01
installation. Low-lying drainageways on the site are underlain by soils of the Gravity series and of the Wabash -Gravity-Nodaway complex. These soils...Shop The electric shop is located in Facility No. 100. Wastes generated from this area include nickel- -- ’ cadmium batteries (24/year) and sulfuric
78 FR 37760 - Electrical Equipment in Hazardous Locations
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-24
... floating facilities engaged in OCS activities, however, equipment could be installed in hazardous locations... composition and the extent of equipment replacement. The myriad types of MODUs and facilities operating on the.... USCG-2012-0850] RIN 1625-AC00 Electrical Equipment in Hazardous Locations AGENCY: Coast Guard, DHS...
75 FR 65151 - Marine Vapor Control Systems
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-21
...The Coast Guard proposes to increase maritime domain safety by revising existing safety regulations for facility and vessel vapor control systems (VCSs). The proposed changes would make VCS requirements more compatible with new Federal and State environmental requirements, reflect industry advancements in VCS technology, and codify the standards for the design and operation of a VCS at tank barge cleaning facilities. These changes would increase the safety of operations by regulating the design, installation, and use of VCSs, but would not require anyone to install or use VCSs.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-13
...The Coast Guard proposes to revise regulations related to the design, certification, inspection, and testing of cranes. These regulations apply to cranes installed on Mobile Offshore Drilling Units (MODUs), Offshore Supply Vessels (OSVs), and floating Outer Continental Shelf (OCS) facilities. This revision would update industry standards incorporated by reference with more recent versions, which are used by industry and incorporated in Bureau of Safety and Environmental Enforcement regulations. Additionally, the Coast Guard proposes to revise regulations regarding certification, inspection, and testing of cranes by allowing use of additional organizations to act in lieu of Coast Guard marine inspectors.
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
46 CFR 111.30-24 - Generation systems greater than 3000 kw.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Section 111.30-24 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-24 Generation systems greater than 3000 kw... Outer Continental Shelf facility, when the total installed electric power of the ship's service...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dennis, C.B.
This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Virginia Army National Guard (VaARNG) property in Sandston, Virginia. The Army Aviation Support Facility (AASF) is contiguous with the Richmond International Airport. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The PA is designed to characterize the site accurately and determine the need for further action by examining site activities, quantities of hazardous substances present, and potential pathwaysmore » by which contamination could affect public health and the environment. The AASF, originally constructed as an active Air Force interceptor base, provides maintenance support for VaARNG aircraft. Hazardous materials used and stored at the facility include JP-4 jet fuel, diesel fuel, gasoline, liquid propane gas, heating oil, and motor oil.« less
30 CFR 77.509 - Transformers; installation and guarding.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Transformers; installation and guarding. 77.509... COAL MINES Electrical Equipment-General § 77.509 Transformers; installation and guarding. (a) Transformers shall be of the totally enclosed type, or shall be placed at least 8 feet above the ground, or...
30 CFR 77.509 - Transformers; installation and guarding.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Transformers; installation and guarding. 77.509... COAL MINES Electrical Equipment-General § 77.509 Transformers; installation and guarding. (a) Transformers shall be of the totally enclosed type, or shall be placed at least 8 feet above the ground, or...
30 CFR 77.509 - Transformers; installation and guarding.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Transformers; installation and guarding. 77.509... COAL MINES Electrical Equipment-General § 77.509 Transformers; installation and guarding. (a) Transformers shall be of the totally enclosed type, or shall be placed at least 8 feet above the ground, or...
30 CFR 77.509 - Transformers; installation and guarding.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Transformers; installation and guarding. 77.509... COAL MINES Electrical Equipment-General § 77.509 Transformers; installation and guarding. (a) Transformers shall be of the totally enclosed type, or shall be placed at least 8 feet above the ground, or...
30 CFR 77.509 - Transformers; installation and guarding.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Transformers; installation and guarding. 77.509... COAL MINES Electrical Equipment-General § 77.509 Transformers; installation and guarding. (a) Transformers shall be of the totally enclosed type, or shall be placed at least 8 feet above the ground, or...
1983-09-01
underlain by soils of the Gravity series and " of the Wabash -Gravity-Nodaway complex. These soils, primarily silty clay loams, are formed in fine...Electric Shop The electric shop is located in Facility No. 100. Wastes generated from this area include nickel- S cadmium batteries (24/year) and sulfuric
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krokosz, M.; Sefano, J.
1993-08-01
This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Alaska Army National Guard property known as Camp Carroll Training Center, located on the Fort Richardson Army facility near Anchorage, Alaska. Preliminary assessments of federal facilities are being conducted to compile the information necessary for the completion of preremedial activities and to provide a basis for establishing, corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining site activities, types and quantities ofmore » hazardous substances used, the nature and amounts of wastes generated or stored at the facility, and potential pathways by which contamination could affect public health and the environment. The primary environmentally significant operations (ESOs) associated with the property are (1) the Alaska Air National Guard storage area behind Building S57112 (Organizational Maintenance Shop [OMS] 6); (2) the state of Alaska maintenance facility and the soil/tar-type spill north of the state of Alaska maintenance facility; (3) the waste storage area adjacent to OMS 6; (4) the contaminated area from leaking underground storage tanks (USTs) and the oil-water separator; and (5) soil staining in the parking area at the Camp Carroll Headquarters Building. Camp Carroll appears to be in excellent condition from an environmental standpoint, and current practices are satisfactory. Argonne recommends that the Alaska Department of Military Affairs consider remediation of soil contamination associated with all storage areas, as well as reviewing the practices of other residents of the facility. Argonne also recommends that the current methods of storing waste material behind Building S57112 (OMS 6) be reviewed for alternatives.« less
1980-11-01
facility common to all facilities as well as a separate municipal waste treatment plant . The crude refinery and petrochemicals plant produces high...offshore: refinery L M H I power plant I L L M I industrial complex I L L L I II Extensive use of sub-sea production systems I M H I up to 5,000 ft. I... petrochemicals factory or a refinery acting as the core around which an in- dustrial complex is built. The type of core industry selected would depend
1984-11-01
quantities of vegetative grco th thr¢cu:ho r ts area. Infiltration of runoff and drainage waLers wuuld o icu n . this area. 3.3.2 SurfEa:- Waer Quality...Wisconsin 608-266-7809 Kevin Kessler Groundwater Coordinator Wisconsin Department of Natural Resources Madison, Wisconsin 608-267-9350 Frank Schultz
Removal of Invasive Fire-Prone Grasses to Increase Training Lands in the Pacific
2008-09-01
Boone Kauffman. U.S. Forest Service. Pacific Northwest Research Center. Hilo . Hawaii . SWCA, Inc. 39 SWCA also acknowledges Amy Brown Curtis...Marine Corps Base Hawaii (MCBH), Marine Corps Training Area Bellows (MCTAB), Army installations Makua Valley, Schofield Barracks, Pohakuloa Training...Area, the Hawaii Army National Guard facility at Diamond Head Crater, and at the Naval Magazine on the Island of Guam. Invasive, fire-prone
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1994-03-01
Fort Myer is a permanent United States Army installation located in Arlington County, Virginia, on a site backing Arlington National Cemetery and overlooking the Potomac River and Washington, D.C. The installation consists of offices, family housing, Army Band facilities, supporting facilities, and barracks buildings including those known as the `Old Guard Barracks` which house soldiers that provide services at Arlington National Cemetery. This report consists of the Summer Steam Shut Down Study of an Energy Savings Opportunity Survey (ESOS) at Fort Myer. The purpose of this study is to improve energy efficiency at Fort Myer by analyzing the effects andmore » benefits of closing the central steam producing boiler facility, Building 447, during the non-heating months from mid-May to mid-October. Currently, the central steam plant operates through this period to provide steam for domestic hot water, steam driven laundry presses, air conditioning system reheat, food preparation and dishwashing demands of twenty-two buildings on the base.« less
1980-11-01
institution to impose charges on members of the Coast Guard’s constituency who benefit from Coast Guard sevices --i.e. establish user charges and value... Sex Ratio - Externalities * Labor Force - Relation to economic growth - Nature and number - Man’s welfare - Participation rate - Productivity rate...Pollution characterisitcs - Sex distribution Radioactive e By Country Thermal Toxic 9 Structure Contanimant - Stratification Long run/short run
1984-12-01
coupled with the enactment of environmental legislation at the Federal, state, and local levels of government , has required action to be taken to... governing the disposal of hazardous waste is the Resource Conservation and Recovery Act (RCRA), as amended. Under Section 6003 of the Act, Federal agencies...disposal sites and make information available to requesting agencies. To assure compliance with these hazardous waste regulations, DoD issued Defense
1990-01-01
There are three above ground storage tanks for the storage of JP-4 jet fuel with ancillary piping, pumps, loading and unloading facilities, and...time daily basis. Workers are present to transfer jet fuel from delivery tncks to the storage tanks and from the storage tanks to fueling trucks...Ground-water flow and contaminant migration at Site 4, the fuel storage area, is generally toward the drainage ditch located immediately north of the
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-11-01
This a continuation of the Installation Restoration Program, Site Investigation Report IRP Sites No. 1, No. 2 and No. 3 at the New York Air National Guard, Roslyn, New York. The soil boring logs are presented.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-11-01
This report is the continuation of the Installation Restoration Program Site Investigation report IRP Sites No. 1, No. 2, and No. 3 at the Air National Guard, Roslyn, New York. The chemical analyses results for soil and ground water samples is reported.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dennis, C.
This report presents the results of the preliminary assessment (PA) conducted by Argonne National Laboratory at the Texas Army National Guard (ARNG) property in Austin, Texas. Preliminary assessments of federal facilities are being conducted to compile the information necessary for completing, preremedial activities and to provide a basis for establishing corrective actions in response to releases of hazardous substances. The principal objective of the PA is to characterize the site accurately and determine the need for further action by examining, site activities, quantities of hazardous substances present, and potential pathways by which contamination could affect public health and the environment.more » This PA satisfies, for the Bee Caves Armory property, the requirements of the Department of Defense Installation Restoration Program. Of concern is the potential for hazardous waste to be present on the property as a result of the former Nike Missile Base operations or in the form of original construction materials. Environmentally sensitive operations associated with the property from that period include (1) underground fuel storage, (2) hazardous materials storage/use, (3) disposal of hazardous waste and (4) release of hazardous waste water.« less
46 CFR 127.330 - Guards in dangerous places.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Guards in dangerous places. 127.330 Section 127.330... ARRANGEMENTS Rails and Guards § 127.330 Guards in dangerous places. Suitable hand covers, guards, or rails must be installed on each exposed and dangerous place, such as gears of rotating machinery, and hot...
46 CFR 127.330 - Guards in dangerous places.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Guards in dangerous places. 127.330 Section 127.330... ARRANGEMENTS Rails and Guards § 127.330 Guards in dangerous places. Suitable hand covers, guards, or rails must be installed on each exposed and dangerous place, such as gears of rotating machinery, and hot...
46 CFR 127.330 - Guards in dangerous places.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Guards in dangerous places. 127.330 Section 127.330... ARRANGEMENTS Rails and Guards § 127.330 Guards in dangerous places. Suitable hand covers, guards, or rails must be installed on each exposed and dangerous place, such as gears of rotating machinery, and hot...
46 CFR 127.330 - Guards in dangerous places.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Guards in dangerous places. 127.330 Section 127.330... ARRANGEMENTS Rails and Guards § 127.330 Guards in dangerous places. Suitable hand covers, guards, or rails must be installed on each exposed and dangerous place, such as gears of rotating machinery, and hot...
46 CFR 127.330 - Guards in dangerous places.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Guards in dangerous places. 127.330 Section 127.330... ARRANGEMENTS Rails and Guards § 127.330 Guards in dangerous places. Suitable hand covers, guards, or rails must be installed on each exposed and dangerous place, such as gears of rotating machinery, and hot...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-11-01
This report is a continuation of the Installation Restoration Program site investigation report for IRP Sites No. 1, No. 2 and No. 3 at the Air National Guard, Rosyln, New York. The Sample Delivery Group (SDG) narratives and quality assurance/quality control analytical results of eighteen samples are reported.
46 CFR 72.40-20 - Guards in dangerous places.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 3 2013-10-01 2013-10-01 false Guards in dangerous places. 72.40-20 Section 72.40-20... ARRANGEMENT Rails and Guards § 72.40-20 Guards in dangerous places. (a) Suitable covers, guards, or rails shall be installed in way of all exposed and dangerous places such as gears, machinery, etc. (b...
46 CFR 92.25-15 - Guards in dangerous places.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Guards in dangerous places. 92.25-15 Section 92.25-15... CONSTRUCTION AND ARRANGEMENT Rails and Guards § 92.25-15 Guards in dangerous places. (a) Suitable hand covers, guards, or rails shall be installed in way of all exposed and dangerous places such as gears, machinery...
46 CFR 72.40-20 - Guards in dangerous places.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 3 2012-10-01 2012-10-01 false Guards in dangerous places. 72.40-20 Section 72.40-20... ARRANGEMENT Rails and Guards § 72.40-20 Guards in dangerous places. (a) Suitable covers, guards, or rails shall be installed in way of all exposed and dangerous places such as gears, machinery, etc. (b...
46 CFR 72.40-20 - Guards in dangerous places.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 3 2010-10-01 2010-10-01 false Guards in dangerous places. 72.40-20 Section 72.40-20... ARRANGEMENT Rails and Guards § 72.40-20 Guards in dangerous places. (a) Suitable covers, guards, or rails shall be installed in way of all exposed and dangerous places such as gears, machinery, etc. (b...
46 CFR 190.25-15 - Guards in dangerous places.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Guards in dangerous places. 190.25-15 Section 190.25-15... CONSTRUCTION AND ARRANGEMENT Rails and Guards § 190.25-15 Guards in dangerous places. (a) Suitable hand covers, guards, or rails shall be installed in way of all exposed and dangerous places such as gears, machinery...
46 CFR 72.40-20 - Guards in dangerous places.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 3 2011-10-01 2011-10-01 false Guards in dangerous places. 72.40-20 Section 72.40-20... ARRANGEMENT Rails and Guards § 72.40-20 Guards in dangerous places. (a) Suitable covers, guards, or rails shall be installed in way of all exposed and dangerous places such as gears, machinery, etc. (b...
46 CFR 92.25-15 - Guards in dangerous places.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Guards in dangerous places. 92.25-15 Section 92.25-15... CONSTRUCTION AND ARRANGEMENT Rails and Guards § 92.25-15 Guards in dangerous places. (a) Suitable hand covers, guards, or rails shall be installed in way of all exposed and dangerous places such as gears, machinery...
46 CFR 190.25-15 - Guards in dangerous places.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Guards in dangerous places. 190.25-15 Section 190.25-15... CONSTRUCTION AND ARRANGEMENT Rails and Guards § 190.25-15 Guards in dangerous places. (a) Suitable hand covers, guards, or rails shall be installed in way of all exposed and dangerous places such as gears, machinery...
46 CFR 72.40-20 - Guards in dangerous places.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 3 2014-10-01 2014-10-01 false Guards in dangerous places. 72.40-20 Section 72.40-20... ARRANGEMENT Rails and Guards § 72.40-20 Guards in dangerous places. (a) Suitable covers, guards, or rails shall be installed in way of all exposed and dangerous places such as gears, machinery, etc. (b...
46 CFR 92.25-15 - Guards in dangerous places.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Guards in dangerous places. 92.25-15 Section 92.25-15... CONSTRUCTION AND ARRANGEMENT Rails and Guards § 92.25-15 Guards in dangerous places. (a) Suitable hand covers, guards, or rails shall be installed in way of all exposed and dangerous places such as gears, machinery...
46 CFR 190.25-15 - Guards in dangerous places.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Guards in dangerous places. 190.25-15 Section 190.25-15... CONSTRUCTION AND ARRANGEMENT Rails and Guards § 190.25-15 Guards in dangerous places. (a) Suitable hand covers, guards, or rails shall be installed in way of all exposed and dangerous places such as gears, machinery...
46 CFR 92.25-15 - Guards in dangerous places.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Guards in dangerous places. 92.25-15 Section 92.25-15... CONSTRUCTION AND ARRANGEMENT Rails and Guards § 92.25-15 Guards in dangerous places. (a) Suitable hand covers, guards, or rails shall be installed in way of all exposed and dangerous places such as gears, machinery...
46 CFR 92.25-15 - Guards in dangerous places.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Guards in dangerous places. 92.25-15 Section 92.25-15... CONSTRUCTION AND ARRANGEMENT Rails and Guards § 92.25-15 Guards in dangerous places. (a) Suitable hand covers, guards, or rails shall be installed in way of all exposed and dangerous places such as gears, machinery...
46 CFR 190.25-15 - Guards in dangerous places.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Guards in dangerous places. 190.25-15 Section 190.25-15... CONSTRUCTION AND ARRANGEMENT Rails and Guards § 190.25-15 Guards in dangerous places. (a) Suitable hand covers, guards, or rails shall be installed in way of all exposed and dangerous places such as gears, machinery...
46 CFR 108.223 - Guards on exposed equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... have hand covers, guards, or rails installed on all belts, gears, shafts, pulleys, sprockets, spindles... 46 Shipping 4 2010-10-01 2010-10-01 false Guards on exposed equipment. 108.223 Section 108.223 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN...
99. Catalog HHistory 1, C.C.C., 23 Guard Rail Construction, Negative ...
99. Catalog H-History 1, C.C.C., 23 Guard Rail Construction, Negative No. P455e (Photographer and date unknown) GUARD RAIL INSTALLATION. - Skyline Drive, From Front Royal, VA to Rockfish Gap, VA , Luray, Page County, VA
1986-12-11
MMR main gate (see Figure 3.2-1). In those ponds Umbrella-grass (Guirena-pumila) and Hyssop Hedge- nettle (Stachys- hyssopifolia) were found. The other...has conducted research in Buildings 286 and 240. From 1963 to 1969, the lab tested insecticides for private companies. Residuals from the 4...Airport Turf Insecticidal Treatments for Japanese Beetle and European Chafer, Eastern Region. Stahl, Ralph G., Joachim G. Liehr, and Ernst M. Davis. 1984
1996-03-01
NATIONAL GUARD GENERAL BILLY MITCHELL FIELD AIR NATIONAL GUARD BASE MILWAUKEE, WISCONSIN MARCH 1996 ______ 19960509 134 HQ ANG/CEVR ANDREWS AFB...Report for IRP Site No. 4, Wisconsin Air National Guard, 128th Air Refueling Wing, General Billy Mitchell Field, Milwaukee, Wisconsin - Volume III...Wisconsin Air National Guard, 128th Air Refueling Wing, General Billy Mitchell Field, Milwaukee, Wisconsin, Volume III - Appendices D-I. This is the
46 CFR 183.200 - General design, installation, and maintenance requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...
46 CFR 129.200 - Design, installation, and maintenance.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Design, installation, and maintenance. 129.200 Section 129.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed,...
46 CFR 183.200 - General design, installation, and maintenance requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...
46 CFR 183.200 - General design, installation, and maintenance requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...
46 CFR 183.200 - General design, installation, and maintenance requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false General design, installation, and maintenance requirements. 183.200 Section 183.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.200 General design, installation, and maintenance...
46 CFR 129.200 - Design, installation, and maintenance.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Design, installation, and maintenance. 129.200 Section 129.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS General Requirements § 129.200 Design, installation, and maintenance. Electrical equipment on a vessel must be designed,...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The objectives of the closure assessment were to determine the extent of contaminated soil adjacent to the USTs requiring excavation, to provide documentation of soil and groundwater conditions following excavation, and to document closure activities in accordance with applicable VADEQ regulations. During closure activities, ASI provided technical support to the Base to ensure that the UST removal contractor (E K, Inc.) hereinafter referred to as the Contractor was in compliance with the technical requirements (as specified in the Plans and Specifications for Removal of Abandoned Underground Storage Tanks, Virginia Air National Guard, Richmond International Airport, Sandston, VA., dated July 1991more » and revised April 1992, and Addendum Numbers 1 through 7) of the contract. ASI was also responsible for collecting soil and/or groundwater closure samples from the excavations, and providing off-site fixed based laboratory analysis to verify clean conditions within the excavations.« less
2012-05-23
CAPE CANAVERAL, Fla. – The high-fidelity space shuttle model is aboard the barge that will transport it from NASA’s Kennedy Space Center in Florida to Johnson Space Center's visitor center in Houston. The model was built in Apopka, Fla., by Guard-Lee and installed at Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility to display space shuttle Atlantis in 2013. For more information about Johnson’s visitor center, called Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Charisse Nahser
2012-05-23
CAPE CANAVERAL, Fla. – The high-fidelity space shuttle model is aboard the barge that will transport it from NASA’s Kennedy Space Center in Florida to Johnson Space Center's visitor center in Houston. The model was built in Apopka, Fla., by Guard-Lee and installed at Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility to display space shuttle Atlantis in 2013. For more information about Johnson’s visitor center, called Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Charisse Nahser
2012-05-23
CAPE CANAVERAL, Fla. – The high-fidelity space shuttle model is aboard the barge that will transport it from NASA’s Kennedy Space Center in Florida to Johnson Space Center's visitor center in Houston. The model was built in Apopka, Fla., by Guard-Lee and installed at Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility to display space shuttle Atlantis in 2013. For more information about Johnson’s visitor center, called Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Charisse Nahser
2012-05-23
CAPE CANAVERAL, Fla. – The high-fidelity space shuttle model is aboard the barge that will transport it from NASA’s Kennedy Space Center in Florida to Johnson Space Center's visitor center in Houston. The model was built in Apopka, Fla., by Guard-Lee and installed at Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility to display space shuttle Atlantis in 2013. For more information about Johnson’s visitor center, called Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Charisse Nahser
2012-05-23
CAPE CANAVERAL, Fla. – The high-fidelity space shuttle model is aboard the barge that will transport it from NASA’s Kennedy Space Center in Florida to Johnson Space Center's visitor center in Houston. The model was built in Apopka, Fla., by Guard-Lee and installed at Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility to display space shuttle Atlantis in 2013. For more information about Johnson’s visitor center, called Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Charisse Nahser
2012-05-23
CAPE CANAVERAL, Fla. – The high-fidelity space shuttle model is aboard the barge that will transport it from NASA’s Kennedy Space Center in Florida to Johnson Space Center's visitor center in Houston. The model was built in Apopka, Fla., by Guard-Lee and installed at Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility to display space shuttle Atlantis in 2013. For more information about Johnson’s visitor center, called Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Charisse Nahser
49 CFR 393.86 - Rear impact guards and rear end protection.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 571.223) in effect at the time the vehicle was manufactured. When the rear impact guard is installed... (49 CFR 571.224) in effect at the time the vehicle was manufactured. The requirements of paragraph (a... extremity of the vehicle. (3) Guard height. The vertical distance between the bottom edge of the horizontal...
49 CFR 393.86 - Rear impact guards and rear end protection.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 571.223) in effect at the time the vehicle was manufactured. When the rear impact guard is installed... (49 CFR 571.224) in effect at the time the vehicle was manufactured. The requirements of paragraph (a... extremity of the vehicle. (3) Guard height. The vertical distance between the bottom edge of the horizontal...
49 CFR 393.86 - Rear impact guards and rear end protection.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 571.223) in effect at the time the vehicle was manufactured. When the rear impact guard is installed... (49 CFR 571.224) in effect at the time the vehicle was manufactured. The requirements of paragraph (a... extremity of the vehicle. (3) Guard height. The vertical distance between the bottom edge of the horizontal...
49 CFR 393.86 - Rear impact guards and rear end protection.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 571.223) in effect at the time the vehicle was manufactured. When the rear impact guard is installed... (49 CFR 571.224) in effect at the time the vehicle was manufactured. The requirements of paragraph (a... extremity of the vehicle. (3) Guard height. The vertical distance between the bottom edge of the horizontal...
46 CFR 58.10-10 - Diesel engine installations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 2 2013-10-01 2013-10-01 false Diesel engine installations. 58.10-10 Section 58.10-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY... installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
46 CFR 111.33-5 - Installation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Installation. 111.33-5 Section 111.33-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Power Semiconductor Rectifier Systems § 111.33-5 Installation. Each semiconductor rectifier system...
Improved Coast Guard Communications Using Commercial Satellites and WWW Technology
DOT National Transportation Integrated Search
1997-06-18
Information collection and distribution are essential components of most Coast Guard missions. However, information needs have typically outpaced the ability of the installed communications systems to meet those needs. This mismatch leads to reduced ...
Nuclear component horizontal seismic restraint
Snyder, Glenn J.
1988-01-01
A nuclear component horizontal seismic restraint. Small gaps limit horizontal displacement of components during a seismic occurrence and therefore reduce dynamic loadings on the free lower end. The reactor vessel and reactor guard vessel use thicker section roll-forged rings welded between the vessel straight shell sections and the bottom hemispherical head sections. The inside of the reactor guard vessel ring forging contains local vertical dovetail slots and upper ledge pockets to mount and retain field fitted and installed blocks. As an option, the horizontal displacement of the reactor vessel core support cone can be limited by including shop fitted/installed local blocks in opposing alignment with the reactor vessel forged ring. Beams embedded in the wall of the reactor building protrude into apertures in the thermal insulation shell adjacent the reactor guard vessel ring and have motion limit blocks attached thereto to provide to a predetermined clearance between the blocks and reactor guard vessel ring.
77 FR 63849 - Facility Security Officer Training Requirements; Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-17
... DEPARTMENT OF HOMELAND SECURITY Coast Guard [Docket No. USCG-2012-0908] Facility Security Officer Training Requirements; Correction AGENCY: Coast Guard, DHS. ACTION: Notice of public meeting; request for... comments on the development of a Facility Security Officer training program. The notice contains an...
Photocopy of plan (in collection of U.S. Coast Guard Civil ...
Photocopy of plan (in collection of U.S. Coast Guard Civil Engineering Unit Providence, Warwick, RI), U.S. Coast Guard Civil Engineering, third district, Sandy Hook L/B Station, Sandy Hook N.J., buoy hoist installation and bldg alterations, January 3, 1952 Details of 4 ton hoist and building, wharf B - U.S. Coast Guard Sandy Hook Station, Western Docking Structure, West of intersection of Canfield Road & Hartshorne Drive, Highlands, Monmouth County, NJ
46 CFR 77.03-1 - Installation and details.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS VESSEL CONTROL AND MISCELLANEOUS SYSTEMS AND EQUIPMENT Marine Engineering Systems § 77.03-1 Installation and details. (a) The installation of all systems of a marine engineering nature, together with the details of design, construction...
28. VIEW OF WHITE SAGE PRIOR TO BEING PAINTED COAST ...
28. VIEW OF WHITE SAGE PRIOR TO BEING PAINTED COAST GUARD COLORS OF BLACK AND WHITE. NOTE ALSO THE PHOTOGRAPH WAS TAKEN PRIOR TO THE INSTALLATION OF A-FRAME MAST AND BOOM AND TO THE CONSTRUCTION OF TURTLE DECK. - U.S. Coast Guard Cutter WHITE SAGE, U.S. Coast Guard 1st District Base, 1 Thames Street, Bristol, Bristol County, RI
The "Suicide Guard Rail": a minimal structural intervention in hospitals reduces suicide jumps.
Mohl, Andreas; Stulz, Niklaus; Martin, Andrea; Eigenmann, Franz; Hepp, Urs; Hüsler, Jürg; Beer, Jürg H
2012-08-04
Jumping from heights is a readily available and lethal method of suicide. This study examined the effectiveness of a minimal structural intervention in preventing suicide jumps at a Swiss general teaching hospital. Following a series of suicide jumps out of the hospital's windows, a metal guard rail was installed at each window of the high-rise building. In the 114 months prior to the installation of the metal guard rail, 10 suicides by jumping out of the hospital's windows occurred among 119,269 inpatients. This figure was significantly reduced to 2 fatal incidents among 104,435 inpatients treated during the 78 months immediately following the installation of the rails at the hospital's windows (χ2 = 4.34, df = 1, p = .037). Even a minimal structural intervention might prevent suicide jumps in a general hospital. Further work is needed to examine the effectiveness of minimal structural interventions in preventing suicide jumps.
The “Suicide Guard Rail”: a minimal structural intervention in hospitals reduces suicide jumps
2012-01-01
Background Jumping from heights is a readily available and lethal method of suicide. This study examined the effectiveness of a minimal structural intervention in preventing suicide jumps at a Swiss general teaching hospital. Following a series of suicide jumps out of the hospital’s windows, a metal guard rail was installed at each window of the high-rise building. Results In the 114 months prior to the installation of the metal guard rail, 10 suicides by jumping out of the hospital’s windows occurred among 119,269 inpatients. This figure was significantly reduced to 2 fatal incidents among 104,435 inpatients treated during the 78 months immediately following the installation of the rails at the hospital’s windows (χ2 = 4.34, df = 1, p = .037). Conclusions Even a minimal structural intervention might prevent suicide jumps in a general hospital. Further work is needed to examine the effectiveness of minimal structural interventions in preventing suicide jumps. PMID:22862804
46 CFR 111.30-1 - Location and installation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...
46 CFR 111.30-1 - Location and installation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...
46 CFR 111.30-1 - Location and installation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...
46 CFR 111.30-1 - Location and installation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...
46 CFR 111.30-1 - Location and installation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Location and installation. 111.30-1 Section 111.30-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-1 Location and installation. Each switchboard must meet the...
46 CFR 58.16-18 - Installation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 2 2010-10-01 2010-10-01 false Installation. 58.16-18 Section 58.16-18 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS Liquefied Petroleum Gases for Cooking and Heating § 58.16-18 Installation. (a) Cylinders...
46 CFR 76.35-15 - Operation and installation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Manual Alarm System, Details § 76.35-15 Operation and installation. (a) The system shall be so arranged and installed that the presence of a fire may be reported from any of the protected spaces and be...
46 CFR 76.35-15 - Operation and installation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Manual Alarm System, Details § 76.35-15 Operation and installation. (a) The system shall be so arranged and installed that the presence of a fire may be reported from any of the protected spaces and be...
46 CFR 76.35-15 - Operation and installation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Manual Alarm System, Details § 76.35-15 Operation and installation. (a) The system shall be so arranged and installed that the presence of a fire may be reported from any of the protected spaces and be...
46 CFR 76.35-15 - Operation and installation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Manual Alarm System, Details § 76.35-15 Operation and installation. (a) The system shall be so arranged and installed that the presence of a fire may be reported from any of the protected spaces and be...
46 CFR 120.200 - General design, installation, and maintenance requirements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false General design, installation, and maintenance requirements. 120.200 Section 120.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150 PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS ELECTRICAL INSTALLATION General...
46 CFR 120.200 - General design, installation, and maintenance requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false General design, installation, and maintenance requirements. 120.200 Section 120.200 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150 PASSENGERS OR WITH OVERNIGHT ACCOMMODATIONS FOR MORE THAN 49 PASSENGERS ELECTRICAL INSTALLATION General...
46 CFR 95.01-2 - Incorporation by reference.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) NFPA 13-1996, Standard for the Installation of Sprinkler Systems, incorporation by reference approved... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CARGO AND MISCELLANEOUS VESSELS FIRE... and Engineering Systems, U.S. Coast Guard Stop 7509, 2703 Martin Luther King Jr. Avenue SE...
46 CFR 95.01-2 - Incorporation by reference.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) NFPA 13-1996, Standard for the Installation of Sprinkler Systems, incorporation by reference approved... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CARGO AND MISCELLANEOUS VESSELS FIRE... and Engineering Systems, U.S. Coast Guard Stop 7509, 2703 Martin Luther King Jr. Avenue SE...
1986-12-11
MG/L Chmia Oxyge 00340 ARSENIC 01000 002BORON 0102 Total Ov-gale 00640 BARIUM 131005 01007 BORON. 01020 CARDON as C 0 * Diseelvud 0 1 CADMIUM 01025...Goldenrod) U - Utricularia sp. (Bladderwort) B - Scirpus sp. (Bulrush) h6 - Myriophyllum tenellui (Leafless Mil- H2 - Elodea sp. (Waterweed) foil) n1... Dioxide I - -- -- Arsenic C 10 (10 10 410 ug/L Barium 14200 j( 200 (200 (200 ug/L Cadmium !4 10 ( 10 1 10 4 10 ug/L Chromium ( 50 4 50 4 50 50 ugSL
2012-05-24
CAPE CANAVERAL, Fla. – As the sun rises over the turn basin at NASA’s Kennedy Space Center in Florida, the barge transporting the high-fidelity space shuttle model begins the journey from Kennedy to Johnson Space Center's visitor center in Houston. The model was built in Apopka, Fla., by Guard-Lee and installed at Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility to display space shuttle Atlantis in 2013. For more information about Johnson’s visitor center, called Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Charisse Nahser
2012-05-22
CAPE CANAVERAL, Fla. – Workers secure the high-fidelity space shuttle model to the structure that will cradle the model on its journey from NASA’s Kennedy Space Center in Florida to Johnson Space Center's visitor center in Houston atop a barge. The model was built in Apopka, Fla., by Guard-Lee and installed at Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility next year to display space shuttle Atlantis in 2013. For more information about Johnson’s visitor center, called Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Amanda Diller
2012-05-24
CAPE CANAVERAL, Fla. – Seen from Jetty Park in Florida, the barge transporting the high-fidelity space shuttle model travels through Port Canaveral during the first leg of their journey from NASA’s Kennedy Space Center to Johnson Space Center's visitor center in Houston. The model was built in Apopka, Fla., by Guard-Lee and installed at Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility to display space shuttle Atlantis in 2013. For more information about Johnson’s visitor center, called Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Jim Grossmann
2012-05-21
CAPE CANAVERAL, Fla. – A barge arrives at NASA Kennedy Space Center’s Launch Complex 39 turn basin in Florida. The high-fidelity space shuttle model is being transported from Kennedy to Space Center Houston, NASA Johnson Space Center's visitor center. The model will be transported via barge to Texas. The model was built in Apopka, Fla., by Guard-Lee and installed at the Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility to display space shuttle Atlantis in 2013. For more information about Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Frankie Martin
2012-05-24
CAPE CANAVERAL, Fla. – The barge transporting the high-fidelity space shuttle model travels through the shallow waters of Port Canaveral, Fla., during the first leg of their journey from NASA’s Kennedy Space Center in Florida to Johnson Space Center's visitor center in Houston. The model was built in Apopka, Fla., by Guard-Lee and installed at Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility to display space shuttle Atlantis in 2013. For more information about Johnson’s visitor center, called Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Jim Grossmann
2012-05-24
CAPE CANAVERAL, Fla. – The barge transporting the high-fidelity space shuttle model begins the journey from NASA’s Kennedy Space Center in Florida to Johnson Space Center's visitor center in Houston. Seen in the background is Kennedy’s Vehicle Assembly Building. The model was built in Apopka, Fla., by Guard-Lee and installed at Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility to display space shuttle Atlantis in 2013. For more information about Johnson’s visitor center, called Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Jim Grossmann
2012-05-22
CAPE CANAVERAL, Fla. – Workers secure the high-fidelity space shuttle model to the structure that will cradle the model on its journey from NASA’s Kennedy Space Center in Florida to Johnson Space Center's visitor center in Houston atop a barge. The model was built in Apopka, Fla., by Guard-Lee and installed at Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility next year to display space shuttle Atlantis in 2013. For more information about Johnson’s visitor center, called Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Amanda Diller
2012-05-22
CAPE CANAVERAL, Fla. – Workers secure the high-fidelity space shuttle model to the structure that will cradle the model on its journey from NASA’s Kennedy Space Center in Florida to Johnson Space Center's visitor center in Houston atop a barge. The model was built in Apopka, Fla., by Guard-Lee and installed at Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility next year to display space shuttle Atlantis in 2013. For more information about Johnson’s visitor center, called Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Amanda Diller
2012-05-24
CAPE CANAVERAL, Fla. – Seen from Jetty Park in Florida, the barge transporting the high-fidelity space shuttle model travels through Port Canaveral during the first leg of their journey from NASA’s Kennedy Space Center to Johnson Space Center's visitor center in Houston. The model was built in Apopka, Fla., by Guard-Lee and installed at Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility to display space shuttle Atlantis in 2013. For more information about Johnson’s visitor center, called Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Jim Grossmann
2012-05-24
CAPE CANAVERAL, Fla. – As the sun rises over the turn basin at NASA’s Kennedy Space Center in Florida, the barge transporting the high-fidelity space shuttle model begins the journey from Kennedy to Johnson Space Center's visitor center in Houston. The model was built in Apopka, Fla., by Guard-Lee and installed at Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility to display space shuttle Atlantis in 2013. For more information about Johnson’s visitor center, called Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Charisse Nahser
2012-05-24
CAPE CANAVERAL, Fla. – The barge transporting the high-fidelity space shuttle model begins the journey from NASA’s Kennedy Space Center in Florida to Johnson Space Center's visitor center in Houston. Seen in the background is Kennedy’s Launch Pad 39A. The model was built in Apopka, Fla., by Guard-Lee and installed at Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility to display space shuttle Atlantis in 2013. For more information about Johnson’s visitor center, called Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Jim Grossmann
2012-05-24
CAPE CANAVERAL, Fla. – The barge transporting the high-fidelity space shuttle model travels through the shallow waters of Port Canaveral, Fla., during the first leg of their journey from NASA’s Kennedy Space Center in Florida to Johnson Space Center's visitor center in Houston. The model was built in Apopka, Fla., by Guard-Lee and installed at Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility to display space shuttle Atlantis in 2013. For more information about Johnson’s visitor center, called Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Jim Grossmann
2012-05-22
CAPE CANAVERAL, Fla. – Workers secure the high-fidelity space shuttle model to the structure that will cradle the model on its journey from NASA’s Kennedy Space Center in Florida to Johnson Space Center's visitor center in Houston atop a barge. The model was built in Apopka, Fla., by Guard-Lee and installed at Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility next year to display space shuttle Atlantis in 2013. For more information about Johnson’s visitor center, called Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Amanda Diller
2012-05-24
CAPE CANAVERAL, Fla. – The barge transporting the high-fidelity space shuttle model travels through the shallow waters of the locks at Port Canaveral, Fla., during the first leg of their journey from NASA’s Kennedy Space Center in Florida to Johnson Space Center's visitor center in Houston. The model was built in Apopka, Fla., by Guard-Lee and installed at Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility to display space shuttle Atlantis in 2013. For more information about Johnson’s visitor center, called Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Jim Grossmann
2012-05-22
CAPE CANAVERAL, Fla. – Workers secure the high-fidelity space shuttle model to the structure that will cradle the model on its journey from NASA’s Kennedy Space Center in Florida to Johnson Space Center's visitor center in Houston atop a barge. The model was built in Apopka, Fla., by Guard-Lee and installed at Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility next year to display space shuttle Atlantis in 2013. For more information about Johnson’s visitor center, called Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Amanda Diller
2012-05-24
CAPE CANAVERAL, Fla. – As the sun rises over the turn basin at NASA’s Kennedy Space Center in Florida, the high-fidelity space shuttle model is aboard the barge that will transport it from Kennedy to Johnson Space Center's visitor center in Houston. The model was built in Apopka, Fla., by Guard-Lee and installed at Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility to display space shuttle Atlantis in 2013. For more information about Johnson’s visitor center, called Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Charisse Nahser
2012-05-21
CAPE CANAVERAL, Fla. – A barge arrives at NASA Kennedy Space Center’s Launch Complex 39 turn basin in Florida. The high-fidelity space shuttle model is being transported from Kennedy to Space Center Houston, NASA Johnson Space Center's visitor center. The model will be transported via barge to Texas. The model was built in Apopka, Fla., by Guard-Lee and installed at the Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility to display space shuttle Atlantis in 2013. For more information about Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Frankie Martin
2012-05-24
CAPE CANAVERAL, Fla. – As the sun rises over the turn basin at NASA’s Kennedy Space Center in Florida, the barge transporting the high-fidelity space shuttle model begins the journey from Kennedy to Johnson Space Center's visitor center in Houston. The model was built in Apopka, Fla., by Guard-Lee and installed at Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility to display space shuttle Atlantis in 2013. For more information about Johnson’s visitor center, called Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Charisse Nahser
2012-05-22
CAPE CANAVERAL, Fla. – The barge that will transport the high-fidelity space shuttle model from NASA’s Kennedy Space Center in Florida to Johnson Space Center's visitor center in Houston is seen in Kennedy’s turn basin near the Vehicle Assembly Building. The model was built in Apopka, Fla., by Guard-Lee and installed at Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility next year to display space shuttle Atlantis in 2013. For more information about Johnson’s visitor center, called Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Amanda Diller
2012-05-22
CAPE CANAVERAL, Fla. – Workers secure the high-fidelity space shuttle model to the structure that will cradle the model on its journey from NASA’s Kennedy Space Center in Florida to Johnson Space Center's visitor center in Houston atop a barge. The model was built in Apopka, Fla., by Guard-Lee and installed at Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility next year to display space shuttle Atlantis in 2013. For more information about Johnson’s visitor center, called Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Amanda Diller
2012-05-22
CAPE CANAVERAL, Fla. – Workers secure the high-fidelity space shuttle model to the structure that will cradle the model on its journey from NASA’s Kennedy Space Center in Florida to Johnson Space Center's visitor center in Houston atop a barge. The model was built in Apopka, Fla., by Guard-Lee and installed at Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility next year to display space shuttle Atlantis in 2013. For more information about Johnson’s visitor center, called Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Amanda Diller
2012-05-24
CAPE CANAVERAL, Fla. – As the sun rises over the turn basin at NASA’s Kennedy Space Center in Florida, the high-fidelity space shuttle model is aboard the barge that will transport it from Kennedy to Johnson Space Center's visitor center in Houston. The model was built in Apopka, Fla., by Guard-Lee and installed at Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility to display space shuttle Atlantis in 2013. For more information about Johnson’s visitor center, called Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Charisse Nahser
46 CFR 76.01-2 - Incorporation by reference.
Code of Federal Regulations, 2014 CFR
2014-10-01
...) NFPA 13-1996, Standard for the Installation of Sprinkler Systems (“NFPA 13”), incorporation by... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION... and Engineering Systems, U.S. Coast Guard Stop 7509, 2703 Martin Luther King Jr. Avenue SE...
46 CFR 76.01-2 - Incorporation by reference.
Code of Federal Regulations, 2013 CFR
2013-10-01
...) NFPA 13-1996, Standard for the Installation of Sprinkler Systems (“NFPA 13”), incorporation by... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION... and Engineering Systems, U.S. Coast Guard Stop 7509, 2703 Martin Luther King Jr. Avenue SE...
1986-03-21
Firm hazardous waste contamination investigations in Utah and Colorado . o Conducted ground and surface water sampling for Durango S UMTRAP (Uranium...BASE COLORADO DAMES & MOORE 1550 NORTHWEST HIGHWAY PARK RIDGE, ILLINOIS 60068 MARCH 21, 1986 FINAL REPORT APPROVED FOR PUBLIC RELEASE; DISTRIBUTION...FOR BUCKIEY AIR NATIONAL GUARD BASE COLORADO HEADQUARTERS AIR NATIONAL GUARD COMMAND SURGEON’S OFFICE (ANGSC/SGB) BIOENVIRONMENTAL ENGINEERING
46 CFR 76.33-90 - Installations contracted for prior to November 19, 1952.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 3 2011-10-01 2011-10-01 false Installations contracted for prior to November 19, 1952. 76.33-90 Section 76.33-90 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Smoke Detecting System, Details § 76.33-90 Installations contracted for...
46 CFR 76.33-90 - Installations contracted for prior to November 19, 1952.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 3 2013-10-01 2013-10-01 false Installations contracted for prior to November 19, 1952. 76.33-90 Section 76.33-90 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Smoke Detecting System, Details § 76.33-90 Installations contracted for...
46 CFR 76.33-90 - Installations contracted for prior to November 19, 1952.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 3 2012-10-01 2012-10-01 false Installations contracted for prior to November 19, 1952. 76.33-90 Section 76.33-90 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Smoke Detecting System, Details § 76.33-90 Installations contracted for...
46 CFR 76.33-90 - Installations contracted for prior to November 19, 1952.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 3 2014-10-01 2014-10-01 false Installations contracted for prior to November 19, 1952. 76.33-90 Section 76.33-90 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Smoke Detecting System, Details § 76.33-90 Installations contracted for...
46 CFR 76.35-90 - Installations contracted for prior to November 19, 1952.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 3 2013-10-01 2013-10-01 false Installations contracted for prior to November 19, 1952. 76.35-90 Section 76.35-90 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Manual Alarm System, Details § 76.35-90 Installations contracted for...
46 CFR 76.35-90 - Installations contracted for prior to November 19, 1952.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 3 2012-10-01 2012-10-01 false Installations contracted for prior to November 19, 1952. 76.35-90 Section 76.35-90 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Manual Alarm System, Details § 76.35-90 Installations contracted for...
46 CFR 76.35-90 - Installations contracted for prior to November 19, 1952.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 3 2014-10-01 2014-10-01 false Installations contracted for prior to November 19, 1952. 76.35-90 Section 76.35-90 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Manual Alarm System, Details § 76.35-90 Installations contracted for...
46 CFR 76.35-90 - Installations contracted for prior to November 19, 1952.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 3 2011-10-01 2011-10-01 false Installations contracted for prior to November 19, 1952. 76.35-90 Section 76.35-90 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Manual Alarm System, Details § 76.35-90 Installations contracted for...
46 CFR 170.270 - Door design, operation, installation, and testing.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Door design, operation, installation, and testing. 170.270 Section 170.270 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SUBDIVISION AND STABILITY STABILITY REQUIREMENTS FOR ALL INSPECTED VESSELS Watertight Bulkhead Doors § 170.270 Door design, operation, installation, and testing. (a...
46 CFR 170.270 - Door design, operation, installation, and testing.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Door design, operation, installation, and testing. 170.270 Section 170.270 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SUBDIVISION AND STABILITY STABILITY REQUIREMENTS FOR ALL INSPECTED VESSELS Watertight Bulkhead Doors § 170.270 Door design, operation, installation, and testing. (a...
46 CFR 170.270 - Door design, operation, installation, and testing.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Door design, operation, installation, and testing. 170.270 Section 170.270 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SUBDIVISION AND STABILITY STABILITY REQUIREMENTS FOR ALL INSPECTED VESSELS Watertight Bulkhead Doors § 170.270 Door design, operation, installation, and testing. (a...
46 CFR 76.01-5 - Equipment installed but not required.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 3 2010-10-01 2010-10-01 false Equipment installed but not required. 76.01-5 Section 76.01-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Application § 76.01-5 Equipment installed but not required. (a) Where fire detecting or...
46 CFR 36.05-1 - Installation of cargo tanks-TB/ALL.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 1 2014-10-01 2014-10-01 false Installation of cargo tanks-TB/ALL. 36.05-1 Section 36.05-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS ELEVATED TEMPERATURE CARGOES... elevated temperatures for the purpose of maintaining the material in the molten form shall be installed...
46 CFR 36.05-1 - Installation of cargo tanks-TB/ALL.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Installation of cargo tanks-TB/ALL. 36.05-1 Section 36.05-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS ELEVATED TEMPERATURE CARGOES... elevated temperatures for the purpose of maintaining the material in the molten form shall be installed...
46 CFR 36.05-1 - Installation of cargo tanks-TB/ALL.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Installation of cargo tanks-TB/ALL. 36.05-1 Section 36.05-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS ELEVATED TEMPERATURE CARGOES... elevated temperatures for the purpose of maintaining the material in the molten form shall be installed...
46 CFR 32.20-1 - Equipment installations on vessels during World War II-TB/ALL.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Equipment installations on vessels during World War II-TB/ALL. 32.20-1 Section 32.20-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS SPECIAL EQUIPMENT, MACHINERY, AND HULL REQUIREMENTS Equipment Installations § 32.20-1 Equipment installations on vessels during World War II—TB/ALL....
46 CFR 193.01-3 - Incorporation by reference.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., Standard for the Installation of Sprinkler Systems, incorporation by reference approved for § 193.30-1. (2... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS FIRE... Design and Engineering Systems, U.S. Coast Guard Stop 7509, 2703 Martin Luther King Jr. Avenue SE...
46 CFR 193.01-3 - Incorporation by reference.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., Standard for the Installation of Sprinkler Systems, incorporation by reference approved for § 193.30-1. (2... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS FIRE... Design and Engineering Systems, U.S. Coast Guard Stop 7509, 2703 Martin Luther King Jr. Avenue SE...
32 CFR 231.6 - Procedures-overseas banks.
Code of Federal Regulations, 2011 CFR
2011-07-01
... statement will include the costs of such equipment and the manner in which it will be acquired. (H) In... custodial and janitorial services to include garbage disposal and outdoor maintenance (such as grass cutting... feasible, Internet access. (H) Military guards, civilian guards (for use within the installation), military...
32 CFR 231.6 - Procedures-overseas banks.
Code of Federal Regulations, 2010 CFR
2010-07-01
... statement will include the costs of such equipment and the manner in which it will be acquired. (H) In... custodial and janitorial services to include garbage disposal and outdoor maintenance (such as grass cutting... feasible, Internet access. (H) Military guards, civilian guards (for use within the installation), military...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Storm rails. 116.920 Section 116.920 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150... and Guards § 116.920 Storm rails. Suitable storm rails or hand grabs must be installed where necessary...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Storm rails. 127.320 Section 127.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS CONSTRUCTION AND ARRANGEMENTS Rails and Guards § 127.320 Storm rails. Suitable storm rails must be installed in each passageway and at...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Storm rails. 127.320 Section 127.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS CONSTRUCTION AND ARRANGEMENTS Rails and Guards § 127.320 Storm rails. Suitable storm rails must be installed in each passageway and at...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Storm rails. 116.920 Section 116.920 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150... and Guards § 116.920 Storm rails. Suitable storm rails or hand grabs must be installed where necessary...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Storm rails. 127.320 Section 127.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS CONSTRUCTION AND ARRANGEMENTS Rails and Guards § 127.320 Storm rails. Suitable storm rails must be installed in each passageway and at...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Storm rails. 127.320 Section 127.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS CONSTRUCTION AND ARRANGEMENTS Rails and Guards § 127.320 Storm rails. Suitable storm rails must be installed in each passageway and at...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Storm rails. 116.920 Section 116.920 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150... and Guards § 116.920 Storm rails. Suitable storm rails or hand grabs must be installed where necessary...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Storm rails. 127.320 Section 127.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS CONSTRUCTION AND ARRANGEMENTS Rails and Guards § 127.320 Storm rails. Suitable storm rails must be installed in each passageway and at...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Storm rails. 116.920 Section 116.920 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150... and Guards § 116.920 Storm rails. Suitable storm rails or hand grabs must be installed where necessary...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Storm rails. 116.920 Section 116.920 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS CARRYING MORE THAN 150... and Guards § 116.920 Storm rails. Suitable storm rails or hand grabs must be installed where necessary...
Low-background Gamma Spectroscopy at Sanford Underground Laboratory
NASA Astrophysics Data System (ADS)
Chiller, Christopher; Alanson, Angela; Mei, Dongming
2014-03-01
Rare-event physics experiments require the use of material with unprecedented radio-purity. Low background counting assay capabilities and detectors are critical for determining the sensitivity of the planned ultra-low background experiments. A low-background counting, LBC, facility has been built at the 4850-Level Davis Campus of the Sanford Underground Research Facility to perform screening of material and detector parts. Like many rare event physics experiments, our LBC uses lead shielding to mitigate background radiation. Corrosion of lead brick shielding in subterranean installations creates radon plate-out potential as well as human risks of ingestible or respirable lead compounds. Our LBC facilities employ an exposed lead shield requiring clean smooth surfaces. A cleaning process of low-activity silica sand blasting and borated paraffin hot coating preservation was employed to guard against corrosion due to chemical and biological exposures. The resulting lead shield maintains low background contribution integrity while fully encapsulating the lead surface. We report the performance of the current LBC and a plan to develop a large germanium well detector for PMT screening. Support provided by Sd governors research center-CUBED, NSF PHY-0758120 and Sanford Lab.
46 CFR 32.20-1 - Equipment installations on vessels during World War II-TB/ALL.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 1 2012-10-01 2012-10-01 false Equipment installations on vessels during World War II-TB/ALL. 32.20-1 Section 32.20-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS... installations on vessels during World War II—TB/ALL. Boilers, pressure vessels, machinery, piping, electrical...
46 CFR 32.20-1 - Equipment installations on vessels during World War II-TB/ALL.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 1 2013-10-01 2013-10-01 false Equipment installations on vessels during World War II-TB/ALL. 32.20-1 Section 32.20-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS... installations on vessels during World War II—TB/ALL. Boilers, pressure vessels, machinery, piping, electrical...
46 CFR 32.20-1 - Equipment installations on vessels during World War II-TB/ALL.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 1 2014-10-01 2014-10-01 false Equipment installations on vessels during World War II-TB/ALL. 32.20-1 Section 32.20-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS... installations on vessels during World War II—TB/ALL. Boilers, pressure vessels, machinery, piping, electrical...
46 CFR 32.20-1 - Equipment installations on vessels during World War II-TB/ALL.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Equipment installations on vessels during World War II-TB/ALL. 32.20-1 Section 32.20-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS... installations on vessels during World War II—TB/ALL. Boilers, pressure vessels, machinery, piping, electrical...
46 CFR 193.05-10 - Fixed fire extinguishing systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
....05-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH... combustion engine installations; (2) Gas turbine installations; (3) Enclosed spaces containing gasoline engines; (4) Chemical storerooms; (5) Any space containing auxiliaries with an aggregate power of 1,000...
46 CFR 193.05-10 - Fixed fire extinguishing systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
....05-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH... combustion engine installations; (2) Gas turbine installations; (3) Enclosed spaces containing gasoline engines; (4) Chemical storerooms; (5) Any space containing auxiliaries with an aggregate power of 1,000...
46 CFR 193.05-10 - Fixed fire extinguishing systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
....05-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH... combustion engine installations; (2) Gas turbine installations; (3) Enclosed spaces containing gasoline engines; (4) Chemical storerooms; (5) Any space containing auxiliaries with an aggregate power of 1,000...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sullivan, W.N.
This report summarizes measured performance of residential geothermal heat pumps (GHP`s) that were installed in family housing units at Ft. Hood, Texas and at Selfridge Air National Guard base in Michigan. These units were built as part of a joint Department of Defense/Department of Energy program to evaluate the energy savings potential of GHP`s installed at military facilities. At the Ft. Hood site, the GHP performance was compared to conventional forced air electric air conditioning and natural gas heating. At Selfridge, the homes under test were originally equipped with electric baseboard heat and no air conditioning. Installation of the GHPmore » systems at both sites was straightforward but more problems and costs were incurred at Selfridge because of the need to install ductwork in the homes. The GHP`s at both sites produced impressive energy savings. These savings approached 40% for most of the homes tested. The low cost of energy on these bases relative to the incremental cost of the GHP conversions precludes rapid payback of the GHP`s from energy savings alone. Estimates based on simple payback (no inflation and no interest on capital) indicated payback times from 15 to 20 years at both sites. These payback times may be reduced by considering the additional savings possible due to reduced maintenance costs. Results are summarized in terms of 15 minute, hourly, monthly, and annual performance parameters. The results indicate that all the systems were working properly but several design shortcomings were identified. Recommendations are made for improvements in future installations at both sites.« less
2012-05-21
CAPE CANAVERAL, Fla. – The high-fidelity space shuttle model awaits to be loaded onto a barge at Kennedy Space Center’s Launch Complex 39 turn basin in Florida. The model is being transported from Kennedy to Space Center Houston, NASA Johnson Space Center's visitor center. The model will be transported via barge to Texas. The model was built in Apopka, Fla., by Guard-Lee and installed at the Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility to display space shuttle Atlantis in 2013. For more information about Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Frankie Martin
2012-05-24
CAPE CANAVERAL, Fla. – The barge transporting the high-fidelity space shuttle model begins the journey from NASA’s Kennedy Space Center in Florida to Johnson Space Center's visitor center in Houston. Seen in the background are Cape Canaveral Air Force Station’s Space Launch Complex-41, left, and the Atlas V Spaceflight Operations Center, right. The model was built in Apopka, Fla., by Guard-Lee and installed at Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility to display space shuttle Atlantis in 2013. For more information about Johnson’s visitor center, called Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Jim Grossmann
2012-05-21
CAPE CANAVERAL, Fla. – The high-fidelity space shuttle model awaits to be loaded onto a barge at Kennedy Space Center’s Launch Complex 39 turn basin in Florida. The model is being transported from Kennedy to Space Center Houston, NASA Johnson Space Center's visitor center. The model will be transported via barge to Texas. The model was built in Apopka, Fla., by Guard-Lee and installed at the Kennedy Space Center Visitor Complex in 1993.The model has been parked at the turn basin the past five months to allow the Kennedy Space Center Visitor Complex to begin building a new facility to display space shuttle Atlantis in 2013. For more information about Space Center Houston, visit http://www.spacecenter.org. Photo credit: NASA/Frankie Martin
Evaluation of the guard rail energy absorbing terminal (G-R-E-A-T) impact attenuator : final report.
DOT National Transportation Integrated Search
1982-09-01
This short report evaluates as many aspects of the Guard Rail Energy Absorbing Terminal (G-R-E-A-T), a vehicle attenuator, as possible. The system was first installed on a particular bridge in September 1979 and was evaluated for three years. No impa...
46 CFR 34.20-90 - Installations contracted for prior to January 1, 1970-T/ALL.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Installations contracted for prior to January 1, 1970-T/ALL. 34.20-90 Section 34.20-90 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS FIREFIGHTING EQUIPMENT Deck Foam System, Details § 34.20-90 Installations contracted for prior to January 1...
46 CFR 34.20-90 - Installations contracted for prior to January 1, 1970-T/ALL.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Installations contracted for prior to January 1, 1970-T/ALL. 34.20-90 Section 34.20-90 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS FIREFIGHTING EQUIPMENT Deck Foam System, Details § 34.20-90 Installations contracted for prior to January 1...
Operating Facilities (OPFAC) of the U.S. Coast Guard. COMDTINST M5440.2N (June 1997)
DOT National Transportation Integrated Search
1997-06-01
This Manual contains the official listing of authorized manned facilities of the Coast Guard as of 1 June 1997. In addition, it indicates the programs with which units are tasked and promulgates the authorized allowance of boats and aircraft for each...
78 FR 20686 - Federal Property Suitable as Facilities To Assist the Homeless
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-05
...-8145; Coast Guard: Commandant, United States Coast Guard, Attn: Jennifer Stomber, 2100 Second St. SW... Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... surplus Federal property reviewed by HUD for suitability for use to assist the homeless. FOR FURTHER...
77 FR 42753 - Federal Property Suitable as Facilities To Assist the Homeless
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-20
... landholding agencies at the following addresses: Coast Guard: Commandant, United States Coast Guard, Attn... Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... surplus Federal property reviewed by HUD for suitability for use to assist the homeless. FOR FURTHER...
78 FR 7442 - Federal Property Suitable as Facilities To Assist the Homeless
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-01
... following addresses: Coast Guard: Commandant, United States Coast Guard, Attn: Jennifer Stomber, 2100 Second... Facilities To Assist the Homeless AGENCY: Office of the Assistant Secretary for Community Planning and... surplus Federal property reviewed by HUD for suitability for use to assist the homeless. FOR FURTHER...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-11-01
This report presents the results of the Site Investigation (SI) conducted at IRP Sites No. 1, No. 2, and No. 3 at the 106th Civil Engineering Flight (CEF) located at Roslyn Air National Guard Station (ANGS), Roslyn, Long Island, New York. A Preliminary Assessment (PA) (AD-A238 847) of the 106th CEF resulted in the identification of two potentially contaminated waste holding areas and a waste sludge application site. These sites were identified as IRP Site No. 1 (Access Road to Aerospace Ground Equipment `AGE` Shop), IRP Site No. 2 (Old Waste Holding Area No. 1), and IRP Site No. 3more » (Old Waste Holding Area No. 2) and recommended for further investigation under the Installation Restoration Program (IRP).« less
33 CFR 183.560 - Hose clamps: Installation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Hose clamps: Installation. 183.560 Section 183.560 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) BOATING SAFETY BOATS AND ASSOCIATED EQUIPMENT Fuel Systems Manufacturer Requirements § 183.560...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-03-01
The Massachusetts Military Reservation (MMR) on Cape Cod, Massachusetts, lies within the boundaries of the towns of Falmouth, Mashpee, Sandwich, and Bourne. The Area of Contamination (AOC) known as Chemical Spill 3 United States Coast Guard (CS-3 (USCG)) is located on Lee Road, in the south central portion of the MMR. The Air Force Center for Environmental Excellence (AFCEE) Installation Restoration Program Office at Otis Air National Guard (ANG) Base, Massachusetts.
33 CFR 125.33 - Holders of Coast Guard Port Security Cards.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Holders of Coast Guard Port... Card are such as to warrant the belief that his presence on waterfront facilities and port and harbor... as to warrant the belief that his presence on waterfront facilities, and port and harbor areas...
33 CFR 125.33 - Holders of Coast Guard Port Security Cards.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Holders of Coast Guard Port... Card are such as to warrant the belief that his presence on waterfront facilities and port and harbor... as to warrant the belief that his presence on waterfront facilities, and port and harbor areas...
33 CFR 125.33 - Holders of Coast Guard Port Security Cards.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Holders of Coast Guard Port... Card are such as to warrant the belief that his presence on waterfront facilities and port and harbor... as to warrant the belief that his presence on waterfront facilities, and port and harbor areas...
33 CFR 125.33 - Holders of Coast Guard Port Security Cards.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Holders of Coast Guard Port... Card are such as to warrant the belief that his presence on waterfront facilities and port and harbor... as to warrant the belief that his presence on waterfront facilities, and port and harbor areas...
33 CFR 125.33 - Holders of Coast Guard Port Security Cards.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Holders of Coast Guard Port... Card are such as to warrant the belief that his presence on waterfront facilities and port and harbor... as to warrant the belief that his presence on waterfront facilities, and port and harbor areas...
75 FR 54025 - Revision of LNG and LHG Waterfront Facility General Requirements
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-03
...-372-1410 or by e-mail at [email protected] . If you have questions on viewing or submitting... Revision of LNG and LHG Waterfront Facility General Requirements AGENCY: Coast Guard, DHS. ACTION: Rule; information collection approval. SUMMARY: In a final rule published May 26, 2010, the Coast Guard amended...
46 CFR 195.05-1 - Installation and details.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Installation and details. 195.05-1 Section 195.05-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS VESSEL... Systems. Fire Detecting and Alarm Systems. Sound Powered Telephone and Voice Tube Systems. Engine Order...
46 CFR 195.05-1 - Installation and details.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Installation and details. 195.05-1 Section 195.05-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS VESSEL... Systems. Fire Detecting and Alarm Systems. Sound Powered Telephone and Voice Tube Systems. Engine Order...
46 CFR 195.05-1 - Installation and details.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Installation and details. 195.05-1 Section 195.05-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS VESSEL... Systems. Fire Detecting and Alarm Systems. Sound Powered Telephone and Voice Tube Systems. Engine Order...
46 CFR 195.05-1 - Installation and details.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Installation and details. 195.05-1 Section 195.05-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS VESSEL... Systems. Fire Detecting and Alarm Systems. Sound Powered Telephone and Voice Tube Systems. Engine Order...
46 CFR 52.01-130 - Installation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 2 2013-10-01 2013-10-01 false Installation. 52.01-130 Section 52.01-130 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING POWER BOILERS General Requirements... the gas passages from the operating boilers. (2) Each main power boiler and auxiliary boiler shall be...
46 CFR 52.01-130 - Installation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 2 2014-10-01 2014-10-01 false Installation. 52.01-130 Section 52.01-130 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING POWER BOILERS General Requirements... the gas passages from the operating boilers. (2) Each main power boiler and auxiliary boiler shall be...
46 CFR 52.01-130 - Installation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 2 2011-10-01 2011-10-01 false Installation. 52.01-130 Section 52.01-130 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING POWER BOILERS General Requirements... the gas passages from the operating boilers. (2) Each main power boiler and auxiliary boiler shall be...
46 CFR 52.01-130 - Installation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 2 2012-10-01 2012-10-01 false Installation. 52.01-130 Section 52.01-130 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING POWER BOILERS General Requirements... the gas passages from the operating boilers. (2) Each main power boiler and auxiliary boiler shall be...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false General. 112.55-1 Section 112.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-1 General. Each storage battery installation must meet Subpart 111...
33 CFR 159.57 - Installation, operation, and maintenance instructions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... capable of navigation by interstate vessel traffic subject to this regulation, marine sanitation devices... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Installation, operation, and maintenance instructions. 159.57 Section 159.57 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF...
46 CFR 38.15-15 - Electrical installations-TB/ALL.
Code of Federal Regulations, 2014 CFR
2014-10-01
... this chapter for tank vessels, except as otherwise specified in this part. (b) Spaces containing cargo... devices, except Coast Guard approved intrinsically safe devices, shall be installed in these spaces. Electric motors shall be segregated from these spaces by a gastight bulkhead. Electric lighting of the...
46 CFR 38.15-15 - Electrical installations-TB/ALL.
Code of Federal Regulations, 2012 CFR
2012-10-01
... this chapter for tank vessels, except as otherwise specified in this part. (b) Spaces containing cargo... devices, except Coast Guard approved intrinsically safe devices, shall be installed in these spaces. Electric motors shall be segregated from these spaces by a gastight bulkhead. Electric lighting of the...
46 CFR 38.15-15 - Electrical installations-TB/ALL.
Code of Federal Regulations, 2010 CFR
2010-10-01
... this chapter for tank vessels, except as otherwise specified in this part. (b) Spaces containing cargo... devices, except Coast Guard approved intrinsically safe devices, shall be installed in these spaces. Electric motors shall be segregated from these spaces by a gastight bulkhead. Electric lighting of the...
46 CFR 38.15-15 - Electrical installations-TB/ALL.
Code of Federal Regulations, 2011 CFR
2011-10-01
... this chapter for tank vessels, except as otherwise specified in this part. (b) Spaces containing cargo... devices, except Coast Guard approved intrinsically safe devices, shall be installed in these spaces. Electric motors shall be segregated from these spaces by a gastight bulkhead. Electric lighting of the...
46 CFR 38.15-15 - Electrical installations-TB/ALL.
Code of Federal Regulations, 2013 CFR
2013-10-01
... this chapter for tank vessels, except as otherwise specified in this part. (b) Spaces containing cargo... devices, except Coast Guard approved intrinsically safe devices, shall be installed in these spaces. Electric motors shall be segregated from these spaces by a gastight bulkhead. Electric lighting of the...
46 CFR 56.50-96 - Keel cooler installations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING PIPING SYSTEMS AND APPURTENANCES Design Requirements Pertaining to Specific Systems § 56.50-96 Keel cooler installations. (a) Keel... forming part of the tube and satisfies all of the following: (i) The cooler structure is fabricated from...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false General. 112.55-1 Section 112.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-1 General. Each storage battery installation must meet Subpart 111...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false General. 112.55-1 Section 112.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-1 General. Each storage battery installation must meet Subpart 111...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false General. 112.55-1 Section 112.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-1 General. Each storage battery installation must meet Subpart 111...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false General. 112.55-1 Section 112.55-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-1 General. Each storage battery installation must meet Subpart 111...
Military Construction: Process and Outcomes
2016-12-14
the Army’s Assistant Chief of Staff for Installation Management (ACSIM), the service’s senior officer responsible for setting installations-related...with the governor as its commander in chief and the Adjutant General (TAG) as its senior military officer .11 Each National Guard is a joint organization...encompasses several steps: determination of need by the local installation commander and engineering office , vetting and prioritization of
1991-02-01
Department of Agriculture (USDA): Soil Conservation Service, February 1968). Houston County is characterized by a warm and humid climate that borders...Figur I..,1 PhUTogrpER Map. of theAre 111-2 3. EXPLANATION - Residuum -~ l Citronelle Formation Catahouia Sandstone Paynes Hammock 0 Oligocene
A continuous hanging iron wall was installed in June, 1996, at the U.S. Coast Guard (USCG) Support Center near Elizabeth City, NC, United States, to treat overlapping plumes of chromate and chlorinated solvent compounds. The wall was emplaced using a continuous trenching machine...
The Multistage Compressor Facility
NASA Technical Reports Server (NTRS)
Flegel, Ashlie
2004-01-01
Research and developments of new aerospace technologies is one of Glenn Research Center's specialties. One facility that deals with the research of aerospace technologies is the High-speed Multistage Compressor Facility. This facility will be testing the performance and efficiency of an Ultra Efficient Engine Technology (UEET) two-stage compressor. There is a lot of preparation involved with testing something of this caliber. Before the test article can be installed into the test rig, the facility must be fully operational and ready to run. Meaning all the necessary instrumentation must be calibrated and installed in the facility. The test rig should also be in safe operating condition, and the proper safety permits obtained. In preparation for the test, the Multistage Compressor Facility went through a few changes. For instance the facility will now be utilizing slip rings, the gearbox went through some maintenance, new lubrications systems replaced the old ones, and special instrumentation needs to be fine tuned to achieve the maximum amount of accurate data. Slips rings help gather information off of a rotating device - in this case from a shaft - onto stationary contacts. The contacts (or brushes) need to be cooled to reduce the amount of frictional heat produced between the slip ring and brushes. The coolant being run through the slip ring is AK-225, a material hazardous to the ozone. To abide by the safety regulations the coolant must be run through a closed chiller system. A new chiller system was purchased but the reservoir that holds the coolant was ventilated which doesn t make the system truly closed and sealed. My task was to design and have a new reservoir built for the chiller system that complies with the safety guidelines. The gearbox had some safety issues also. Located in the back of the gearbox an inching drive was set up. When the inching drive is in use the gears and chain are bare and someone can easily get caught up in it. So to prevent anyone from getting hurt in the gears I designed a chain guard. Additional information is included in the original extended abstract.
46 CFR 34.20-1 - Application-T/ALL.
Code of Federal Regulations, 2010 CFR
2010-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS FIREFIGHTING EQUIPMENT Deck Foam System, Details § 34.20-1 Application—T/ALL. (a) Where a deck foam system is installed, the provisions of this... foam systems by this subpart must have systems that are designed and installed in accordance with...
46 CFR 34.20-1 - Application-T/ALL.
Code of Federal Regulations, 2011 CFR
2011-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS FIREFIGHTING EQUIPMENT Deck Foam System, Details § 34.20-1 Application—T/ALL. (a) Where a deck foam system is installed, the provisions of this... foam systems by this subpart must have systems that are designed and installed in accordance with...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Radio. 169.715 Section 169.715 Shipping COAST GUARD..., Miscellaneous Systems, and Equipment § 169.715 Radio. (a) Radiotelegraph and radiotelephone installations are... Regulations, part 83. (b) A valid certificate issued by the FCC is evidence that the radio installation is in...
33 CFR 117.24 - Radiotelephone installation identification.
Code of Federal Regulations, 2014 CFR
2014-07-01
... the Service Signs established by the Federal Highway Administration (FHWA) in U.S. Road Symbol Signs... identification. (a) The Coast Guard authorizes, and the District Commander may require the installation of a sign... operates a VHF radiotelephone in accordance with § 117.23. (b) The sign shall give notice of the...
33 CFR 117.24 - Radiotelephone installation identification.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the Service Signs established by the Federal Highway Administration (FHWA) in U.S. Road Symbol Signs... identification. (a) The Coast Guard authorizes, and the District Commander may require the installation of a sign... operates a VHF radiotelephone in accordance with § 117.23. (b) The sign shall give notice of the...
33 CFR 117.24 - Radiotelephone installation identification.
Code of Federal Regulations, 2013 CFR
2013-07-01
... the Service Signs established by the Federal Highway Administration (FHWA) in U.S. Road Symbol Signs... identification. (a) The Coast Guard authorizes, and the District Commander may require the installation of a sign... operates a VHF radiotelephone in accordance with § 117.23. (b) The sign shall give notice of the...
33 CFR 117.24 - Radiotelephone installation identification.
Code of Federal Regulations, 2012 CFR
2012-07-01
... the Service Signs established by the Federal Highway Administration (FHWA) in U.S. Road Symbol Signs... identification. (a) The Coast Guard authorizes, and the District Commander may require the installation of a sign... operates a VHF radiotelephone in accordance with § 117.23. (b) The sign shall give notice of the...
33 CFR 117.24 - Radiotelephone installation identification.
Code of Federal Regulations, 2011 CFR
2011-07-01
... the Service Signs established by the Federal Highway Administration (FHWA) in U.S. Road Symbol Signs... identification. (a) The Coast Guard authorizes, and the District Commander may require the installation of a sign... operates a VHF radiotelephone in accordance with § 117.23. (b) The sign shall give notice of the...
2001-08-22
KENNEDY SPACE CENTER, Fla. -- On KSC’s Shuttle Landing Facility runway 15 following mission STS-105, orbiter Discovery undergoes safing operations such as being checked for toxic or hazardous gases, and having purge air introduced to cool the vehicle and humidified air conditioning to the payload bay and other cavities to remove any residual explosive or toxic fumes that may be present. The operations include preparing the orbiter for ground tow operations, installing switch guards and removing data packages from any onboard experiments. Main gear touchdown was at 2:22:58 p.m. EDT; wheel stop, at 2:24:06 p.m. EDT. The 11-day, 21-hour, 12-minute mission accomplished the goals set for the 11th flight to the International Space Station: swapout of the resident Station crew; delivery of equipment, supplies and scientific experiments; and installation of the Early Ammonia Servicer and heater cables for the S0 truss on the Station. Discovery traveled 4.3 million miles on its 30th flight into space, the 106th mission of the Space Shuttle program. Out of five missions in 2001, the landing was the first to occur in daylight at KSC
2001-08-22
KENNEDY SPACE CENTER, Fla. -- On KSC’s Shuttle Landing Facility runway 15 following mission STS-105, orbiter Discovery undergoes safing operations such as being checked for toxic or hazardous gases, and having purge air introduced to cool the vehicle and humidified air conditioning to the payload bay and other cavities to remove any residual explosive or toxic fumes that may be present. The operations include preparing the orbiter for ground tow operations, installing switch guards and removing data packages from any onboard experiments. Main gear touchdown was at 2:22:58 p.m. EDT; wheel stop, at 2:24:06 p.m. EDT. The 11-day, 21-hour, 12-minute mission accomplished the goals set for the 11th flight to the International Space Station: swapout of the resident Station crew; delivery of equipment, supplies and scientific experiments; and installation of the Early Ammonia Servicer and heater cables for the S0 truss on the Station. Discovery traveled 4.3 million miles on its 30th flight into space, the 106th mission of the Space Shuttle program. Out of five missions in 2001, the landing was the first to occur in daylight at KSC
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
The objectives of the SNAP 7A program were to design, manufacture, test, and deliver a five-watt electric generation system for a U. S. Coast Guard 8 x 26E light buoy. The 10-watt Sr/sup 90/ thermoelectric generator, the d-c-to-d-c converter, batteries and the method of installation in the light buoy are describcd. The SNAP 7A generator was fueled with four capsules containing a total of 40,800 curies of Sr/sup 90/ titanate. After fueling and testing, the SNAP 7A electric generating system was installed in the Coast Guard light buoy at Baltimore, Maryland, on December 15, 1961. Operation of the buoy lampmore » is continuous. (auth)« less
29 CFR 1917.112 - Guarding of edges.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 7 2010-07-01 2010-07-01 false Guarding of edges. 1917.112 Section 1917.112 Labor... (CONTINUED) MARINE TERMINALS Terminal Facilities § 1917.112 Guarding of edges. (a) Vehicle protection. (1... provided at the waterside edges of aprons and bulkheads, except where vehicles are prohibited. Curbs or...
46 CFR 111.05-3 - Design, construction, and installation; general.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Design, construction, and installation; general. 111.05-3 Section 111.05-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-3 Design, construction, and...
46 CFR 111.05-3 - Design, construction, and installation; general.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Design, construction, and installation; general. 111.05-3 Section 111.05-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Equipment Ground, Ground Detection, and Grounded Systems § 111.05-3 Design, construction, and...
46 CFR 162.161-5 - Instruction manual for design, installation, operation, and maintenance.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 6 2014-10-01 2014-10-01 false Instruction manual for design, installation, operation, and maintenance. 162.161-5 Section 162.161-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Fixed Clean Agent Fire Extinguishing Systems §...
46 CFR 32.35-5 - Installation of internal combustion engines-TB/ALL.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 1 2013-10-01 2013-10-01 false Installation of internal combustion engines-TB/ALL. 32.35-5 Section 32.35-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS SPECIAL... combustion engines—TB/ALL. Each internal combustion engine located on the weather deck shall be provided with...
46 CFR 32.35-5 - Installation of internal combustion engines-TB/ALL.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 1 2012-10-01 2012-10-01 false Installation of internal combustion engines-TB/ALL. 32.35-5 Section 32.35-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS SPECIAL... combustion engines—TB/ALL. Each internal combustion engine located on the weather deck shall be provided with...
46 CFR 32.35-5 - Installation of internal combustion engines-TB/ALL.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 1 2014-10-01 2014-10-01 false Installation of internal combustion engines-TB/ALL. 32.35-5 Section 32.35-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS SPECIAL... combustion engines—TB/ALL. Each internal combustion engine located on the weather deck shall be provided with...
46 CFR 32.35-5 - Installation of internal combustion engines-TB/ALL.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Installation of internal combustion engines-TB/ALL. 32.35-5 Section 32.35-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS SPECIAL... combustion engines—TB/ALL. Each internal combustion engine located on the weather deck shall be provided with...
46 CFR 32.35-5 - Installation of internal combustion engines-TB/ALL.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Installation of internal combustion engines-TB/ALL. 32.35-5 Section 32.35-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS SPECIAL... combustion engines—TB/ALL. Each internal combustion engine located on the weather deck shall be provided with...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meyer, R.T.; Coe, B.A.; Dick, J.D.
1981-01-01
Four state-owned building complexes ahve been evaluated within the city of Durango: The State Fish Hatchery, Fort Lewis College, new State Highway Department Building near the Bodo Industrial Park, and the National Guard Building. Three of the state facilities in Durango are evaluated for geothermal systems on thea ssumption of taking geothermal water from a trunk-line originating at the area northof Durango: State Fish Hatchery, Fort Lewis College and new State Highway Department Building. The National Guard Building is evaluated on the basis of a water-to-air heat pump, with warm water derived from a hypothetical shallow aquifer immediately below themore » building site. Two geothermal options were separately evaluated for Fort Lewis College: a central heat exchanger system for delivery of 145/sup 0/F heating water to the campus buildings and a central heat pump system for boosting the heating water to 200/sup 0/F prior to delivery to the buildings; both systems require the installation of a distribution piping network for the entire campus area. Retrofit engineering for the State Fish Hatchery provides for the installation of a small scale central distribution piping system to the several buildings, a central heat excanger coupled to the geothermal trunk line, and the use of various fan coil and unit heaters for space heating. An option is provided for discharge-mixing the geothermal water into the fish ponds and runs in order to raise the hatchery water temperature a couple degrees for increasing fish production and yield. The heating system for the new State Highway Department Building is redesigned to replace the natural-gas-fired forced-air furnaces with a heat exchanger, hot water fan coils and unit heaters.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-29
..., loss or injury due to the installation of flood control structures/barriers. Vessels and tows transiting this zone transiting the specified water are required to proceed at slowest safe speed to minimize... Coast Guard and the contractually imposed timeline for the installation of flood control structures...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Tests. 189.35-5 Section 189.35-5 Shipping COAST GUARD... Weight Handling Gear § 189.35-5 Tests. (a) An installation load test and safety assessment shall be..., of the time and place of the installation tests when occurring in a port of the United States to...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Tests. 189.35-5 Section 189.35-5 Shipping COAST GUARD... Weight Handling Gear § 189.35-5 Tests. (a) An installation load test and safety assessment shall be..., of the time and place of the installation tests when occurring in a port of the United States to...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Tests. 189.35-5 Section 189.35-5 Shipping COAST GUARD... Weight Handling Gear § 189.35-5 Tests. (a) An installation load test and safety assessment shall be..., of the time and place of the installation tests when occurring in a port of the United States to...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Tests. 189.35-5 Section 189.35-5 Shipping COAST GUARD... Weight Handling Gear § 189.35-5 Tests. (a) An installation load test and safety assessment shall be..., of the time and place of the installation tests when occurring in a port of the United States to...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Tests. 189.35-5 Section 189.35-5 Shipping COAST GUARD... Weight Handling Gear § 189.35-5 Tests. (a) An installation load test and safety assessment shall be..., of the time and place of the installation tests when occurring in a port of the United States to...
46 CFR 31.35-1 - Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL. 31.35-1 Section 31.35-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK... and power equipment, batteries, etc.—TB/ALL. All tank vessels are subject to the regulations contained...
76 FR 35378 - Installation and Use of Engine Cut-Off Switches on Recreational Vehicles
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-17
... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Parts 175 and 183 [Docket No. USCG-2009-0206] RIN 1825-AB34 Installation and Use of Engine Cut-Off Switches on Recreational Vehicles Correction Proposed Rule document 2011-14140 was inadvertently published in the Rules section of the issue of June 8...
46 CFR 31.35-1 - Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL. 31.35-1 Section 31.35-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK... and power equipment, batteries, etc.—TB/ALL. All tank vessels are subject to the regulations contained...
46 CFR 31.35-1 - Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 1 2012-10-01 2012-10-01 false Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL. 31.35-1 Section 31.35-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK... and power equipment, batteries, etc.—TB/ALL. All tank vessels are subject to the regulations contained...
46 CFR 31.35-1 - Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 1 2014-10-01 2014-10-01 false Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL. 31.35-1 Section 31.35-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK... and power equipment, batteries, etc.—TB/ALL. All tank vessels are subject to the regulations contained...
46 CFR 31.35-1 - Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 1 2013-10-01 2013-10-01 false Electrical installations, lighting and power equipment, batteries, etc.-TB/ALL. 31.35-1 Section 31.35-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK... and power equipment, batteries, etc.—TB/ALL. All tank vessels are subject to the regulations contained...
No Further Remedial Action Planned Decision Document for Site 3.
1998-04-01
INSTALLATION RESTORATION PROGRAM No FURTHER REMEDIAL ACTION PLANNED DECISION DOCUMENT FOR SITE 3 FINAL MICHIGAN AIR NATIONAL GUARD ALPENA ...COMBAT READINESS TRAINING CENTER ALPENA , MICHIGAN April 1998 Air National Guard Andrews AFB, Maryland &nc QUALITY IMSmm«^ 19980519 204 XA REPORT...Document for Site 3 at Alpena CRTC, Alpena , MI. 6. AUTHOR(S) N/A 5. FUNDING NUMBERS 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Montgomery
1996-05-01
This Decision Document (DD) supports the no further action alternative for Site 15 - Oiled Roads at the Alpena Combat Readiness Training Center (CRTC...in Alpena , Michigan. The purpose of the DD is to summarize the existing data for the site and describe the Air National Guard’s rational for selecting the no further action alternative.
Personnel Policies for an Operational Army National Guard
2008-06-13
ARNG for their time and thoughtfulness in identifying critical policies from which I was able to develop the survey and the basis for my thesis...Green, MAJ Shaffer, and MAJ Beckler for providing keen editing. To my children Ashten, Taven, and Gabren, thank you for playing quietly because Dad is...Guard Bureau RC Army’s Reserve Components RSP Recruit Sustainment Program SIDPERS Standard Installation/Division Personnel System TDA Table of
33 CFR 20.1103 - Availability of decisions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... document inspection facility at the office of any Coast Guard District, Activity, or Sector Office; (ii) The public reading room at Coast Guard Headquarters; and (iii) The public reading room of the Coast...
Agha, Mickey; Lovich, Jeffrey E.; Ennen, Joshua R.; Wilcox, Ethan
2013-01-01
We observed behavior consistent with nest-guarding in Agassiz's desert tortoise (Gopherus agassizii) at two nests in a large wind-energy-generation facility near Palm Springs, California, locally known as the Mesa Wind Farm. As researchers approached the nests, female desert tortoises moved to the entrance of their burrows and positioned themselves sideways, directly over their nests. One female stretched her limbs outward and wedged herself into the burrow (her plastron directly above the nest). Guarding of nests is rarely observed in Agassiz's desert tortoise but can occur as a result of attempted predation on eggs by Gila monsters (Heloderma suspectum) or in direct response to the perceived threat posed by researchers. This is the first report of nest-guarding for G. agassizii in the Sonoran Desert ecosystem of California.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-24
... Office of Management and Budget; OMB Control Number: 1625-0106 AGENCY: Coast Guard, DHS. ACTION: Sixty....S. Coast Guard intends to submit an Information Collection Request (ICR) to the Office of Management... Coast Guard docket number [USCG-2011-0087] to the Docket Management Facility (DMF) at the U.S...
Code of Federal Regulations, 2010 CFR
2010-07-01
... SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Facility Design, Fabrication, and Installation Certified Verification Agent... Facility Design Report and the Fabrication and Installation Report. (b) For a fixed or floating facility...
Photocopy of plan (in collection of U.S. Coast Guard Civil ...
Photocopy of plan (in collection of U.S. Coast Guard Civil Engineering Unit Providence, Warwick, RI) U.S. Coast Guard, shore maintenance detachment, New York, mooring facilities for 110 WPB's Station Sandy Hook, Middletown Township, New Jersey, civil demolition of wharf & pier E December 22, 1988 detail of framing and decking wharf B - U.S. Coast Guard Sandy Hook Station, Western Docking Structure, West of intersection of Canfield Road & Hartshorne Drive, Highlands, Monmouth County, NJ
FEDERAL FACILITIES IN EPA REGION 6
Locations of federal facilities in EPA Region 6. Facilities from the Corps of Engineers, Veterans Administration, Army, Navy, Air National Guard, etc. are included. This is not a complete set of facilities. The facilities included are only those with value added locations used in...
33 CFR 154.1216 - Facility classification.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Facility classification. 154.1216... Vegetable Oils Facilities § 154.1216 Facility classification. (a) The Coast Guard classifies facilities that... classification of a facility that handles, stores, or transports animal fats or vegetable oils. The COTP may...
33 CFR 154.1216 - Facility classification.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Facility classification. 154.1216... Vegetable Oils Facilities § 154.1216 Facility classification. (a) The Coast Guard classifies facilities that... classification of a facility that handles, stores, or transports animal fats or vegetable oils. The COTP may...
33 CFR 154.1216 - Facility classification.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Facility classification. 154.1216... Vegetable Oils Facilities § 154.1216 Facility classification. (a) The Coast Guard classifies facilities that... classification of a facility that handles, stores, or transports animal fats or vegetable oils. The COTP may...
33 CFR 154.1216 - Facility classification.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Vegetable Oils Facilities § 154.1216 Facility classification. (a) The Coast Guard classifies facilities that handle, store, or transport animal fats or vegetable oils as “substantial harm” facilities because they... classification of a facility that handles, stores, or transports animal fats or vegetable oils. The COTP may...
33 CFR 154.1216 - Facility classification.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Vegetable Oils Facilities § 154.1216 Facility classification. (a) The Coast Guard classifies facilities that handle, store, or transport animal fats or vegetable oils as “substantial harm” facilities because they... classification of a facility that handles, stores, or transports animal fats or vegetable oils. The COTP may...
A 46 m long, 7.3 m deep, and 0.6 m wide permeable subsurface reactive wall was installed at the U.S. Coast Guard (USCG) Support Center, near Elizabeth City, North Carolina, in June 1996. The reactive wall was designed to remediate hexavalent chromium [Cr(VI)] contaminated ground ...
Stewart Air National Guard Base, NY, C-5M Painting Refurbishment Assessment
2012-12-06
is asthma due to sensitization. After sensitization, any exposure , even to levels below the occupational exposure limit, can produce an asthmatic...Consultative Services Division provide a comprehensive exposure and risk assessment of the corrosion control process conducted on the C-5M in Building...101 at Stewart Air National Guard Base, NY. This facility was previously a fuels systems maintenance facility. At the time of this assessment, the
1991-02-01
Pliocene I Neogene 5 Miocene o 0 24 Oligocene Paleogene Eocene 58 6 Paleocene 5I56 Cretaceous u 144- 0 Jurassic 0N 208- Z TriassicI 245- (L Permian 286...and its unnamed tributary I are classified as warm water fisheries. G. Groundwater Use of Uppermost Aquifer. I Site Nos. 1-3, Factor Rating 2. The
1993-11-01
GUARD BASE BATTLE CREEK, MICHIGANI REGIONAL LOCATION MAP ýIG A NI -1 10t TAI MICHIAN I i~amoNL GUAR 1- 94Frie Lake ma 61 , 1cI Lose onI diI 0I...textile fabrics. Xylenes are also used in the manufacture of quartz crystal oscillators, hydrogen peroxide, perfumes , insect repellants, epoxy resins
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-01-01
Decision Document for IRP Site No. 3 - Storage Area at the USMC Sublease Area, California Air National Guard, 144th Fighter Wing, Fresno Air Terminal, Fresno, California. This report documents the data, conclusion, and recommendation to support a No Further Remedial Action Planned decision at Site 3 under the IRP.
11. REINFORCED CONCRETE SLAB ROOF, GUARD RAIL AT CENTER, VIEW ...
11. REINFORCED CONCRETE SLAB ROOF, GUARD RAIL AT CENTER, VIEW TOWARDS NORTHWEST. - Glenn L. Martin Company, Titan Missile Test Facilities, Captive Test Stand D-1, Waterton Canyon Road & Colorado Highway 121, Lakewood, Jefferson County, CO
Arctic Shield 2015 Field Campaign Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stafford, Robert A; Ivey, Mark
During the week of July 13, 2015, the U.S. Coast Guard’s (USCG) Research and Development Center partnered with Conoco Phillips through a Cooperative Research and Development Agreement to conduct a Search and Rescue (SAR) exercise off of Oliktok Point, Alaska. The Coast Guard was interested in exploring how unmanned aircraft systems (UAS) can be used to enhance capabilities for its SAR mission and gain a better understanding of how it could work jointly with private industry for response operations in remote regions. Participants in the exercise included Coast Guard Pacific Area Command, Coast Guard Cutter Healy, Coast Guard District Seventeen,more » Coast Guard Air Station Kodiak, and Conoco Phillips. Joining Conoco Phillips were their partners Insitu (a Boeing company), Era Helicopter, and Era Helicopter’s partner Priority One. Other government agencies supporting the exercise were the U.S. Department of Energy’s (DOE) Atmospheric Radiation Measurement (ARM) Climate Research Facility, the National Oceanic and Atmospheric Administration, the Federal Aviation Administration, and the North Slope Borough of the state of Alaska. The exercise scenario involved a simulated small aircraft crash offshore where the survivors took refuge in a 6-man life raft. The aircraft’s last known position and asset availability required the Coast Guard to coordinate the response with Conoco Phillips. This included the use of an Insitu-operated ScanEagle UAS, flown from DOE-ARM’s Sandia National Laboratory-operated facility at Oliktok Point, and manned aircraft provided by both the Coast Guard’s Forward Operating Location in Deadhorse and Era Helicopter. Lessons learned from this exercise will help the Coast Guard understand how to best collaborate with private industry on the North Slope during response operations and develop requirements for UAS performing Coast Guard missions in the Arctic environment. For the ARM facility, the exercise demonstrated some of the opportunities and constraints of using UAS in the Arctic for research purposes.« less
Range Environmental Assessment Overland Air Operations, Eglin Air Force Base, Florida
2014-11-12
Level AICUZ Air Installation Compatible Use Zones ALANG Alabama Air National Guard ALARNG Alabama Army National Guard ASC Aeronautical Systems Center...7th Special Forces Group (Airborne) (7 SFG): x 2 − Alabama Air National Guard ( ALANG ): x 2 − Other Units: x 2 − 53rd Wing (53 WG): x 1.5...N&P 3 6 CH47 CH-47D 2 4 C23 HS748 1 2 U28A JPATS 2 4 CASA212 HS748 1 2 ALANG UH60 UH60A 4 8 Total for R-2915A 7575 14293 R-2915B AFSOC A10 A
Code of Federal Regulations, 2014 CFR
2014-07-01
... Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MARITIME SECURITY MARITIME SECURITY: FACILITIES Facility Security Assessment (FSA) § 105.300 General. (a) The Facility Security... the Facility Security Officer (FSO) reviews and accepts their work. (d) Those involved in a FSA must...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MARITIME SECURITY MARITIME SECURITY: FACILITIES Facility Security Assessment (FSA) § 105.300 General. (a) The Facility Security... the Facility Security Officer (FSO) reviews and accepts their work. (d) Those involved in a FSA must...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MARITIME SECURITY MARITIME SECURITY: FACILITIES Facility Security Assessment (FSA) § 105.300 General. (a) The Facility Security... the Facility Security Officer (FSO) reviews and accepts their work. (d) Those involved in a FSA must...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MARITIME SECURITY MARITIME SECURITY: FACILITIES Facility Security Assessment (FSA) § 105.300 General. (a) The Facility Security... the Facility Security Officer (FSO) reviews and accepts their work. (d) Those involved in a FSA must...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MARITIME SECURITY MARITIME SECURITY: FACILITIES Facility Security Assessment (FSA) § 105.300 General. (a) The Facility Security... the Facility Security Officer (FSO) reviews and accepts their work. (d) Those involved in a FSA must...
Code of Federal Regulations, 2010 CFR
2010-07-01
... MINERALS MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Facility Design, Fabrication, and Installation Reports... (§ 285.651): (1) A Facility Design Report; and (2) A Fabrication and Installation Report. (b) You may...
2015-09-17
impact influenced by its internal and external supply chain activities. This starts with understanding how we currently apply advanced analytic techniques... minimalistic model provides for sufficient degrees of freedom to guard against overfitting. Second, to guard against the possibility of an over-trained model in... starting with 1*. 201* All Military compensation EEICs starting with 201*. Facility Sustainment 52* & 56* All facility maintenance, repair and minor
46 CFR 2.75-40 - Suspension of approval.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Approvals of Safety Equipment, Materials and Installations, and Qualifications for Construction Personnel... approval (if any), and may direct the holder to cease claiming the defective items are Coast Guard approved...
46 CFR 2.75-40 - Suspension of approval.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Approvals of Safety Equipment, Materials and Installations, and Qualifications for Construction Personnel... approval (if any), and may direct the holder to cease claiming the defective items are Coast Guard approved...
46 CFR 2.75-40 - Suspension of approval.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Approvals of Safety Equipment, Materials and Installations, and Qualifications for Construction Personnel... approval (if any), and may direct the holder to cease claiming the defective items are Coast Guard approved...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Specifications for the Design... Appendix E to Part 157—Specifications for the Design, Installation and Operation of a Part Flow System for... Coast Guard for clarity. 1Purpose The purpose of these Specifications is to provide specific design...
33 CFR 149.655 - What are the requirements for helicopter fueling facilities?
Code of Federal Regulations, 2014 CFR
2014-07-01
... helicopter fueling facilities? 149.655 Section 149.655 Navigation and Navigable Waters COAST GUARD... EQUIPMENT Design and Equipment Helicopter Fueling Facilities § 149.655 What are the requirements for helicopter fueling facilities? Helicopter fueling facilities must comply with 46 CFR 108.489 or an equivalent...
33 CFR 149.655 - What are the requirements for helicopter fueling facilities?
Code of Federal Regulations, 2013 CFR
2013-07-01
... helicopter fueling facilities? 149.655 Section 149.655 Navigation and Navigable Waters COAST GUARD... EQUIPMENT Design and Equipment Helicopter Fueling Facilities § 149.655 What are the requirements for helicopter fueling facilities? Helicopter fueling facilities must comply with 46 CFR 108.489 or an equivalent...
33 CFR 149.655 - What are the requirements for helicopter fueling facilities?
Code of Federal Regulations, 2010 CFR
2010-07-01
... helicopter fueling facilities? 149.655 Section 149.655 Navigation and Navigable Waters COAST GUARD... EQUIPMENT Design and Equipment Helicopter Fueling Facilities § 149.655 What are the requirements for helicopter fueling facilities? Helicopter fueling facilities must comply with 46 CFR 108.489 or an equivalent...
33 CFR 149.655 - What are the requirements for helicopter fueling facilities?
Code of Federal Regulations, 2012 CFR
2012-07-01
... helicopter fueling facilities? 149.655 Section 149.655 Navigation and Navigable Waters COAST GUARD... EQUIPMENT Design and Equipment Helicopter Fueling Facilities § 149.655 What are the requirements for helicopter fueling facilities? Helicopter fueling facilities must comply with 46 CFR 108.489 or an equivalent...
33 CFR 149.655 - What are the requirements for helicopter fueling facilities?
Code of Federal Regulations, 2011 CFR
2011-07-01
... helicopter fueling facilities? 149.655 Section 149.655 Navigation and Navigable Waters COAST GUARD... EQUIPMENT Design and Equipment Helicopter Fueling Facilities § 149.655 What are the requirements for helicopter fueling facilities? Helicopter fueling facilities must comply with 46 CFR 108.489 or an equivalent...
33 CFR 154.120 - Facility examinations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Facility examinations. 154.120...) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK General § 154.120 Facility examinations. (a) The facility operator shall allow the Coast Guard, at any time, to make any examination and shall...
1992-01-01
except TPH, which was detected at 0.06 mg/l in Monitor Well 01-MW-02. Some metals (arsenic, cadmium , chromium, lead, silver, and zinc ) were detected at...extraction. Trace quantities of some priority pollutant metals were detected in the surface water samples. Arsenic, cadmium , and zinc were detected at...storage tank. TPH was detected in all five groundwater samples. Arsenic, beryllium, cadmium , chromium, copper, lead, nickel, silver, and zinc were also
1998-04-01
INSTALLATION RESTORATION PROGRAM No FURTHER REMEDIAL ACTION PLANNED DECISION DOCUMENT FOR SITE 8 FINAL MICHIGAN AIR NATIONAL GUARD ALPENA ...COMBAT READINESS TRAINING CENTER ALPENA , MICHIGAN April 1998 Air National Guard Andrews AFB, Maryland fr r=.~r i^:r^f>^’ m% Approved for public...Document 4. TITLE AND SUBTITLE No Further Action Decision Document for Site 8 at Alpena CRTC, Alpena , MI. 6. AUTHOR(S) N/A 7. PERFORMING
1. VIEW, LOOKING NORTH, OF THE SOUTH ELEVATION OF BUILDING ...
1. VIEW, LOOKING NORTH, OF THE SOUTH ELEVATION OF BUILDING 901. BUILDING 901 IS ONE OF FOUR GUARD TOWERS INSTALLED AS PART OF THE PERIMETER SECURITY ZONE TO PROVIDE PROTECTIVE FORCE PERSONNEL WITH A CLEAR HIGH VIEW OF THE SURROUNDING AREAS. THE PERIMETER SECURITY ZONE CONSISTS OF A DOUBLE PERIMETER FENCE WITH CLOSED CIRCUIT TELEVISIONS, ALARMS, AND AN UNINTERRUPTED POWER SUPPLY. - Rocky Flats Plant, Guard Tower, Southeast corner of protected area, Golden, Jefferson County, CO
1989-02-01
contaminated by past disposal practices. Sampling and analysis was not included in the PA. B. MAJOR FINDINGS The Air National Guard has utilized...with 23 Base personnel and the field surveys identified 3 potentially contaminated sites resulting from past disposal, storage, and/or spills and leaks...characteristic petroleum odor. With visible evidence of released contaminants , there is potential for contaminant migration by shallow groundwater. Site No. 3
DOT National Transportation Integrated Search
1981-11-01
Coast Guard Vessel Traffic Service (VTS) facilities rely heavily on radio communications to acquire the location of vessels and disseminate this information to other interested shipping. As the communication requirements change, the Coast Guard must ...
33 CFR 127.601 - Fire equipment: General.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) WATERFRONT FACILITIES WATERFRONT FACILITIES HANDLING LIQUEFIED NATURAL GAS AND LIQUEFIED HAZARDOUS GAS Waterfront Facilities Handling Liquefied Natural Gas Firefighting § 127.601 Fire equipment: General. (a) Fire... Laboratories, Inc., the Factory Mutual Research Corp., or the Coast Guard. ...
33 CFR 127.601 - Fire equipment: General.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) WATERFRONT FACILITIES WATERFRONT FACILITIES HANDLING LIQUEFIED NATURAL GAS AND LIQUEFIED HAZARDOUS GAS Waterfront Facilities Handling Liquefied Natural Gas Firefighting § 127.601 Fire equipment: General. (a) Fire... Laboratories, Inc., the Factory Mutual Research Corp., or the Coast Guard. ...
33 CFR 159.201 - Recognition of facilities.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Recognition of facilities. 159.201 Section 159.201 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) POLLUTION MARINE SANITATION DEVICES Recognition of Facilities § 159.201 Recognition of facilities...
2016-10-01
1 AWARD NUMBER: W81XWH-15-1-0506 TITLE: Mental Health Disorders, Suicide Risk, and Treatment seeking among Formerly Deployed National Guard... Suicide Risk, and Treatment seeking among Formerly Deployed National Guard and Reserve Service Member seen in Non-VA Facilities 5b. GRANT NUMBER W81XWH...and Reserve veterans. The prevalence of current PTSD was 7% (95% CI = 5.7-8.5). Preliminary analyses indicated that PTSD, depression , mental health
30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...
30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...
30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...
30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...
30 CFR 75.1712-6 - Underground sanitary facilities; installation and maintenance.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Underground sanitary facilities; installation... Miscellaneous § 75.1712-6 Underground sanitary facilities; installation and maintenance. (a) Except as provided in § 75.1712-7, each operator of an underground coal mine shall provide and maintain one sanitary...
Code of Federal Regulations, 2010 CFR
2010-07-01
... MANAGEMENT SERVICE, DEPARTMENT OF THE INTERIOR OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Facility Design, Fabrication, and Installation Certified... Facility Design Report and Fabrication and Installation Report. (1) If the CVA or project engineer finds...
National Guard Support to Drug Interdiction.
1994-10-28
Passenger Analysis Unit, Sterling, VA Enforcement Branch, Birmingham, AL Inspection Facility, Birmingham, AL JFK Airport Contraband Enforcement Team...Operations, New York, NY JFK Airport Mail Facility Operations, New York, NY Mail Facility, Sterling, VA Office of Enforcement, Jackson, MS Office
1991-10-01
during the RI; or to provide information for the determination that no further action is required if risks to human and environmental receptors are not...constitute an environmental risk . Exposure media and routes may differ between various organisms due to their physiological and behavioral differences...important species are relatively well documented. U Groundwater 3 Groundwater contaminants may constitute a risk to environmental receptors when
A Study of the Effects of Insulation Gaps on Building Heat Loss
1980-04-01
the Guarded Hot Box. Figure 4, taken from ASTM C-236, shows the essential details of the Guarded Hot Box Test Apparatus. Details of the Johns - Manville Research...The walls are 1-3/- inches thick and are of sandwich construction, with a core of 2 pcf polyvinyl-chloride foam ( Johns - Manville Vinylcel) with faces...Council of Canada (NRC) ane at the Johns - Manville Research Center, was installed and tested as a wall. The test history of that pane] is shown in Table 3
30 CFR 285.702 - What must I include in my Fabrication and Installation Report?
Code of Federal Regulations, 2010 CFR
2010-07-01
... INTERIOR OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Facility Design, Fabrication, and Installation Reports § 285.702 What must I include in my Fabrication and... fabricated and installed in accordance with the design criteria identified in the Facility Design Report...
33 CFR 19.15 - Permits for commercial vessels handling explosives at military installations.
Code of Federal Regulations, 2011 CFR
2011-07-01
... no quantitative restrictions, based on considerations of isolation and remoteness, shall be required... from the Coast Guard for such operations with respect to quantitative or other restrictions imposed by...
33 CFR 19.15 - Permits for commercial vessels handling explosives at military installations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... no quantitative restrictions, based on considerations of isolation and remoteness, shall be required... from the Coast Guard for such operations with respect to quantitative or other restrictions imposed by...
33 CFR 19.15 - Permits for commercial vessels handling explosives at military installations.
Code of Federal Regulations, 2013 CFR
2013-07-01
... no quantitative restrictions, based on considerations of isolation and remoteness, shall be required... from the Coast Guard for such operations with respect to quantitative or other restrictions imposed by...
33 CFR 19.15 - Permits for commercial vessels handling explosives at military installations.
Code of Federal Regulations, 2012 CFR
2012-07-01
... no quantitative restrictions, based on considerations of isolation and remoteness, shall be required... from the Coast Guard for such operations with respect to quantitative or other restrictions imposed by...
33 CFR 19.15 - Permits for commercial vessels handling explosives at military installations.
Code of Federal Regulations, 2014 CFR
2014-07-01
... no quantitative restrictions, based on considerations of isolation and remoteness, shall be required... from the Coast Guard for such operations with respect to quantitative or other restrictions imposed by...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kraybill, R.L.; Smart, G.R.; Bopp, F.
1985-09-04
A Problem Confirmation Study was performed at seven sites on Otis Air National Guard Base: the Current and Former Training Areas, the Base Landfill, the Nondestructive Inspection Laboratory, the Fuel Test Dump Site, the Railyard Fuel Pumping Station, and the Petrol Fuel Storage Area. The field investigation was conducted in two stages, in November 1983 through January 1984, and in October through December 1984. Resampling was performed at selected locations in April and July 1985. A total of 11 monitor wells were installed and sampled and test-pit investigations were conducted at six sites. In addition, the contents of a sumpmore » tank, and two header pipes for fuel-transmission lines were sampled. Analytes included TOC, TOX, cyanide, phenols, Safe Drinking Water metals, pesticides and herbicides, and in the second round, priority-pollutant volatile organic compounds and a GC fingerprint scan for fuel products. On the basis of the field-work findings, it is concluded that, to date, water-quality impacts on ground water from past activities have been minimal.« less
46 CFR 160.151-45 - Equipment required for servicing facilities.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 6 2011-10-01 2011-10-01 false Equipment required for servicing facilities. 160.151-45 Section 160.151-45 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT...) § 160.151-45 Equipment required for servicing facilities. Each servicing facility approved by the Coast...
46 CFR 4.03-5 - Medical facility.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 1 2012-10-01 2012-10-01 false Medical facility. 4.03-5 Section 4.03-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY PROCEDURES APPLICABLE TO THE PUBLIC MARINE CASUALTIES AND INVESTIGATIONS Definitions § 4.03-5 Medical facility. The term medical facility means an American hospital...
46 CFR 4.03-5 - Medical facility.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 1 2013-10-01 2013-10-01 false Medical facility. 4.03-5 Section 4.03-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY PROCEDURES APPLICABLE TO THE PUBLIC MARINE CASUALTIES AND INVESTIGATIONS Definitions § 4.03-5 Medical facility. The term medical facility means an American hospital...
46 CFR 4.03-5 - Medical facility.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 1 2014-10-01 2014-10-01 false Medical facility. 4.03-5 Section 4.03-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY PROCEDURES APPLICABLE TO THE PUBLIC MARINE CASUALTIES AND INVESTIGATIONS Definitions § 4.03-5 Medical facility. The term medical facility means an American hospital...
33 CFR 105.295 - Additional requirements-Certain Dangerous Cargo (CDC) facilities.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Dangerous Cargo (CDC) facilities. 105.295 Section 105.295 Navigation and Navigable Waters COAST GUARD... Requirements § 105.295 Additional requirements-Certain Dangerous Cargo (CDC) facilities. (a) At all MARSEC Levels, owners or operators of CDC facilities must ensure the implementation of the following security...
33 CFR 105.295 - Additional requirements-Certain Dangerous Cargo (CDC) facilities.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Dangerous Cargo (CDC) facilities. 105.295 Section 105.295 Navigation and Navigable Waters COAST GUARD... Requirements § 105.295 Additional requirements-Certain Dangerous Cargo (CDC) facilities. (a) At all MARSEC Levels, owners or operators of CDC facilities must ensure the implementation of the following security...
33 CFR 105.295 - Additional requirements-Certain Dangerous Cargo (CDC) facilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Dangerous Cargo (CDC) facilities. 105.295 Section 105.295 Navigation and Navigable Waters COAST GUARD... Requirements § 105.295 Additional requirements-Certain Dangerous Cargo (CDC) facilities. (a) At all MARSEC Levels, owners or operators of CDC facilities must ensure the implementation of the following security...
33 CFR 105.295 - Additional requirements-Certain Dangerous Cargo (CDC) facilities.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Dangerous Cargo (CDC) facilities. 105.295 Section 105.295 Navigation and Navigable Waters COAST GUARD... Requirements § 105.295 Additional requirements-Certain Dangerous Cargo (CDC) facilities. (a) At all MARSEC Levels, owners or operators of CDC facilities must ensure the implementation of the following security...
33 CFR 105.295 - Additional requirements-Certain Dangerous Cargo (CDC) facilities.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Dangerous Cargo (CDC) facilities. 105.295 Section 105.295 Navigation and Navigable Waters COAST GUARD... Requirements § 105.295 Additional requirements-Certain Dangerous Cargo (CDC) facilities. (a) At all MARSEC Levels, owners or operators of CDC facilities must ensure the implementation of the following security...
46 CFR 4.03-5 - Medical facility.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 1 2010-10-01 2010-10-01 false Medical facility. 4.03-5 Section 4.03-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY PROCEDURES APPLICABLE TO THE PUBLIC MARINE CASUALTIES AND INVESTIGATIONS Definitions § 4.03-5 Medical facility. The term medical facility means an American hospital...
46 CFR 4.03-5 - Medical facility.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 1 2011-10-01 2011-10-01 false Medical facility. 4.03-5 Section 4.03-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY PROCEDURES APPLICABLE TO THE PUBLIC MARINE CASUALTIES AND INVESTIGATIONS Definitions § 4.03-5 Medical facility. The term medical facility means an American hospital...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MARITIME SECURITY MARINE SECURITY: OUTER CONTINENTAL SHELF (OCS) FACILITIES Outer Continental Shelf (OCS) Facility Security Assessment (FSA) § 106.300 General. (a) The Facility Security Assessment (FSA) is a written document that is...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MARITIME SECURITY MARINE SECURITY: OUTER CONTINENTAL SHELF (OCS) FACILITIES Outer Continental Shelf (OCS) Facility Security Assessment (FSA) § 106.300 General. (a) The Facility Security Assessment (FSA) is a written document that is...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MARITIME SECURITY MARINE SECURITY: OUTER CONTINENTAL SHELF (OCS) FACILITIES Outer Continental Shelf (OCS) Facility Security Assessment (FSA) § 106.300 General. (a) The Facility Security Assessment (FSA) is a written document that is...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MARITIME SECURITY MARINE SECURITY: OUTER CONTINENTAL SHELF (OCS) FACILITIES Outer Continental Shelf (OCS) Facility Security Assessment (FSA) § 106.300 General. (a) The Facility Security Assessment (FSA) is a written document that is...
Code of Federal Regulations, 2011 CFR
2011-07-01
... ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF Facility Design, Fabrication, and..., survey, or check, the installation items required by this section. (a) The CVA or project engineer must... according to the Facility Design Report and the Fabrication and Installation Report. (b) For a fixed or...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1987-11-01
The Hazardous Materials Technical Center (HMTC) was retained in May 1986 to conduct the Installation-Restoration Program (IRP) Preliminary Assessment (PA) - Records Search for the 155th Tactical Reconnaissance Group (TRG), Nebraska Air National Guard, Lincoln Municipal Airport, Lincoln, Nebraska (hereinafter referred to as the Base). The Records Search included: an onsite visit including interviews with 19 Base personnel conducted by HMTC personnel on 21-23 May 1986; the acquisition and analysis of pertinent information and records on hazardous materials use and hazardous-waste generation and disposal at the Base; the acquisition and analysis of available geologic, hydrologic, meteorologic, and environmental data frommore » pertinent Federal, State, and local agencies; and the identification of sites on the Base that may be potentially contaminated with hazardous materials/hazardous wastes (HM/HW).« less
2015-03-01
C-27J to the Coast Guard. This report assesses (1) the status of the transfer and risks the Coast Guard faces in fielding the transferred aircraft...had transferred 2 of the 14 C-27J aircraft it is receiving from the Air Force to its aircraft maintenance facility, with plans to field 14 fully...Coast Guard continues to receive these aircraft in the near term, the capability and cost of the Coast Guard’s fixed-wing fleet runs the risk of being
14 CFR 171.271 - Installation requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
...) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave Landing System (ISMLS) § 171.271 Installation requirements. (a) The ISMLS facility must be permanent in nature, located... codes, FCC licensing requirements, and paragraphs (a) and (c) of § 171.261. (b) The ISMLS facility must...
14 CFR 171.271 - Installation requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
...) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave Landing System (ISMLS) § 171.271 Installation requirements. (a) The ISMLS facility must be permanent in nature, located... codes, FCC licensing requirements, and paragraphs (a) and (c) of § 171.261. (b) The ISMLS facility must...
14 CFR 171.271 - Installation requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
...) NAVIGATIONAL FACILITIES NON-FEDERAL NAVIGATION FACILITIES Interim Standard Microwave Landing System (ISMLS) § 171.271 Installation requirements. (a) The ISMLS facility must be permanent in nature, located... codes, FCC licensing requirements, and paragraphs (a) and (c) of § 171.261. (b) The ISMLS facility must...
2. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD ...
2. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD SUPPORT CENTER, FACILITIES ENGINEERING DIVISION, NEW YORK, KEY PLAN OF SECOND AND THIRD FLOORS, UNKNOWN DELINEATOR, APRIL 1939 - Governors Island, Half Moon Battery, New York Harbor near Comfort & Barry Roads, New York County, NY
3. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD ...
3. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD SUPPORT CENTER, FACILITIES ENGINEERING DIVISION, NEW YORK, INTERIOR PLAN OF CORBIN HALL, DRAWN BY H. BOSSERT, APRIL 25, 1939 - Governors Island, Half Moon Battery, New York Harbor near Comfort & Barry Roads, New York County, NY
8. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD ...
8. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD SUPPORT CENTER, FACILITIES ENGINEERING DIVISION, NEW YORK, VIEW OF SOUTH FRONT AND EAST SIDE, CORBIN HALL, UNKNOWN DELINEATOR, 1932 - Governors Island, Half Moon Battery, New York Harbor near Comfort & Barry Roads, New York County, NY
4. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD ...
4. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD SUPPORT CENTER, FACILITIES ENGINEERING DIVISION, NEW YORK, PLAN OF NORTH INTERIOR SIDE, DRAWN BY H. BOSSERT, APRIL 25, 1939 - Governors Island, Half Moon Battery, New York Harbor near Comfort & Barry Roads, New York County, NY
7. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD ...
7. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD SUPPORT CENTER, FACILITIES ENGINEERING DIVISION, NEW YORK, SOUTH INTERIOR VIEW, CORBIN HALL, DRAWN BY H.F. BOSSERT, APRIL 24, 1938 - Governors Island, Half Moon Battery, New York Harbor near Comfort & Barry Roads, New York County, NY
1. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD ...
1. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD SUPPORT CENTER, FACILITIES ENGINEERING DIVISION, NEW YORK, KEY PLAN OF FIRST FLOOR, DRAWN BY D. KORNIT, DECEMBER 1939 - Governors Island, Half Moon Battery, New York Harbor near Comfort & Barry Roads, New York County, NY
6. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD ...
6. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD SUPPORT CENTER, FACILITIES ENGINEERING DIVISION, NEW YORK, EXTERIOR DETAIL OF PALLADIAN (SOUTH) WINDOW, CORBIN HALL, UNKNOWN DELINEATOR, JULY 28, 1938 - Governors Island, Half Moon Battery, New York Harbor near Comfort & Barry Roads, New York County, NY
46 CFR 110.30-3 - Initial inspection.
Code of Federal Regulations, 2010 CFR
2010-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS... inspections during the construction of the vessel, includes a complete inspection of the electric installation and electric equipment or apparatus. The inspection is to determine that the arrangement, materials...
46 CFR 110.30-3 - Initial inspection.
Code of Federal Regulations, 2014 CFR
2014-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS... inspections during the construction of the vessel, includes a complete inspection of the electric installation and electric equipment or apparatus. The inspection is to determine that the arrangement, materials...
46 CFR 110.30-3 - Initial inspection.
Code of Federal Regulations, 2011 CFR
2011-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS... inspections during the construction of the vessel, includes a complete inspection of the electric installation and electric equipment or apparatus. The inspection is to determine that the arrangement, materials...
46 CFR 195.05-1 - Installation and details.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS VESSEL... of this type include the following: Ship's Service Generating Systems. Ship's Service Power... Lighting and Power Systems. Electric Lifeboat Winch Systems. Electric Steering Gear and Steering Control...
1987-06-01
Each of these sites involves POL releases, detection of which is amenable to geophysical/geochemi- cal methods . ES-8 I A I A I I I I ~ i I I ii I VN...Precipitation in Columbus, Ohio, averages 36.71 inches per year. By calcu- lating net precipitation according to the method outlined in the Federal Regis- ter...spill absorption devices. Fuel that was not recovered either evaporated, was absorbed into the ground, or entered the base drainage system from the west
1991-02-01
analysis of water, soil, and/or sediment samples, are required. Careful documentation and quality control procedures in accordance with CERCLA/SARA...I III-1 I I Northern Piedmont * AI Southern Piedmont a’.3 Cahaba Valley... ...... Coosa ValleyI Fall Line Hills Aluvial Plain Black Prairie3 Cu enu e...no surface outlet; (b) A drainage basin or river basin; (c) A low area in the Earth’s crust, of tectonic origin, in which sediments have accumulated
1991-02-01
and the Upper Cambrian age Gatesburg formation crop out (Figure 111.3). Specifically, the Station location is shown to be underlain by the Stonehenge ...the Larke formation is generally absent in this part of Centre County, and a hiatus exists between the Stonehenge formation and the underlying Gatesburg...formation. Therefore, the Stonehenge formation exists unconformably in contact with the Mines member of the Gatesburg formation. In addition, the
1985-10-01
bromochioromethane. 2-bromo- 1 - 8.2.3. check standard containing each parameter chloropropane . and 1.4-dichlorobutane is 8&.2 Beginning with Section...Modification 1 (IRP Stage 1 , Otis ANGB) Roy F Weston Attn: Pete Marks Weston Way West Chester PA 19380 1 . The Goverment is contemplating assignment of the...delivery order described in Atch 1 hereto under the subject contract, Pertinent details are included in Atch 1 and herein. Request Contractor
1989-10-01
Coord: Elev.PROTECTIVE CSG He~qht I Material /Type El e~. ________Diameter Elie.hI____ Depth BGS ___________Weep Hole (YIN) HSe.ht __ GUARD POSTS (YIN...Tremied I Y/14) SCR EE N Type Dimeter - --Slot Size Ck Type SUMP (YIN) Interval OGS Lcngth - 90tt0m Cop (YIN) BACKFILL PLUG Material ...for transport to the laboratory. The remaining liners will then be extruded and the material used for lithologic description and other analyses. The
Code of Federal Regulations, 2011 CFR
2011-07-01
... construct and install facilities under my approved COP? 285.632 Section 285.632 Mineral Resources BUREAU OF... Requirements Activities Under An Approved Cop § 285.632 What documents must I submit before I may construct and install facilities under my approved COP? (a) You must submit to MMS the documents listed in the following...
Code of Federal Regulations, 2014 CFR
2014-07-01
... construct and install facilities under my approved COP? 585.632 Section 585.632 Mineral Resources BUREAU OF... Approved Cop § 585.632 What documents must I submit before I may construct and install facilities under my approved COP? (a) You must submit to BOEM the documents listed in the following table: Document...
Code of Federal Regulations, 2013 CFR
2013-07-01
... construct and install facilities under my approved COP? 585.632 Section 585.632 Mineral Resources BUREAU OF... Approved Cop § 585.632 What documents must I submit before I may construct and install facilities under my approved COP? (a) You must submit to BOEM the documents listed in the following table: Document...
Code of Federal Regulations, 2011 CFR
2011-07-01
... installing facilities described in my approved SAP, COP, or GAP? 285.700 Section 285.700 Mineral Resources... described in my approved SAP, COP, or GAP? (a) You must submit the following reports to MMS before installing facilities described in your approved COP (§ 285.632(a)) and, when required by this part, your SAP...
Code of Federal Regulations, 2012 CFR
2012-07-01
... construct and install facilities under my approved COP? 585.632 Section 585.632 Mineral Resources BUREAU OF... Approved Cop § 585.632 What documents must I submit before I may construct and install facilities under my approved COP? (a) You must submit to BOEM the documents listed in the following table: Document...
46 CFR 160.151-47 - Requirements for owners or operators of servicing facilities.
Code of Federal Regulations, 2011 CFR
2011-10-01
... facilities. 160.151-47 Section 160.151-47 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Inflatable Liferafts (SOLAS) § 160.151-47 Requirements for owners or operators of servicing facilities. To maintain...
33 CFR 106.405 - Format and content of the Facility Security Plan (FSP).
Code of Federal Regulations, 2010 CFR
2010-07-01
...; (9) Security systems and equipment maintenance; (10) Security measures for access control; (11... Facility Security Plan (FSP). 106.405 Section 106.405 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MARITIME SECURITY MARINE SECURITY: OUTER CONTINENTAL SHELF (OCS) FACILITIES...
2009-09-01
should be in place for consulting with local medical facilities or Coast Guard assigned Public Health Service medical doctors. 1.6.4 International SAR...accordance with the Chapter 12 of the CG Aids to Navigation Manual - Administrative . Charts of NAVTEX service areas are available on the CG NAVCEN...and equipment. Some Coast Guard operating units have Emergency Medical Technicians (EMTs); a few units have a Health Services Technician attached
46 CFR 110.30-5 - Inspection for certification.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Testing and Inspection § 110.30-5 Inspection for certification. Electric installations and electric... mechanical and electrical condition and performance. Particular note must be made of circuits added or...
46 CFR 110.30-5 - Inspection for certification.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Testing and Inspection § 110.30-5 Inspection for certification. Electric installations and electric... mechanical and electrical condition and performance. Particular note must be made of circuits added or...
46 CFR 110.30-5 - Inspection for certification.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING GENERAL PROVISIONS Testing and Inspection § 110.30-5 Inspection for certification. Electric installations and electric... mechanical and electrical condition and performance. Particular note must be made of circuits added or...
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2013 CFR
2013-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
Research notes : cable guard rail preventing injuries on I-5.
DOT National Transportation Integrated Search
1997-11-01
The ODOT Research Unit is currently evaluating a cable median guardrail installed on Interstate 5 between Brooks and Donald. The intent of this median application is to reduce the incidence of serious injuries and fatalities by preventing crossover a...
Generic Protocol for the Verification of Ballast Water Treatment Technology
In anticipation of the need to address performance verification and subsequent approval of new and innovative ballast water treatment technologies for shipboard installation, the U.S Coast Guard and the Environmental Protection Agency‘s Environmental Technology Verification Progr...
46 CFR 95.01-2 - Incorporation by reference.
Code of Federal Regulations, 2011 CFR
2011-10-01
... for the Installation of Sprinkler Systems, incorporation by reference approved for § 95.30-1. (2... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CARGO AND MISCELLANEOUS VESSELS FIRE... Specification for International Shore Connections for Marine Fire Applications, incorporation by reference...
46 CFR 193.01-3 - Incorporation by reference.
Code of Federal Regulations, 2011 CFR
2011-10-01
... for the Installation of Sprinkler Systems, incorporation by reference approved for § 193.30-1. (2... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS FIRE... Specification for International Shore Connections for Marine Fire Applications, incorporation by reference...
46 CFR 193.01-3 - Incorporation by reference.
Code of Federal Regulations, 2012 CFR
2012-10-01
... for the Installation of Sprinkler Systems, incorporation by reference approved for § 193.30-1. (2... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS FIRE... Specification for International Shore Connections for Marine Fire Applications, incorporation by reference...
46 CFR 95.01-2 - Incorporation by reference.
Code of Federal Regulations, 2012 CFR
2012-10-01
... for the Installation of Sprinkler Systems, incorporation by reference approved for § 95.30-1. (2... Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) CARGO AND MISCELLANEOUS VESSELS FIRE... Specification for International Shore Connections for Marine Fire Applications, incorporation by reference...
46 CFR 111.20-10 - Autotransformers.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Autotransformers. 111.20-10 Section 111.20-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Transformer Construction, Installation, and Protection § 111.20-10 Autotransformers. An...
46 CFR 111.20-10 - Autotransformers.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Autotransformers. 111.20-10 Section 111.20-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Transformer Construction, Installation, and Protection § 111.20-10 Autotransformers. An...
46 CFR 111.20-10 - Autotransformers.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Autotransformers. 111.20-10 Section 111.20-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Transformer Construction, Installation, and Protection § 111.20-10 Autotransformers. An...
46 CFR 111.20-10 - Autotransformers.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Autotransformers. 111.20-10 Section 111.20-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Transformer Construction, Installation, and Protection § 111.20-10 Autotransformers. An...
46 CFR 111.20-10 - Autotransformers.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Autotransformers. 111.20-10 Section 111.20-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Transformer Construction, Installation, and Protection § 111.20-10 Autotransformers. An...
46 CFR 111.95-1 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Electric Power-Operated Boat Winches § 111.95-1 Applicability. (a) The electric installation of each electric power-operated boat winch must meet the requirements in this subpart, except that limit...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-07
... for all Mobile Offshore Drilling Units and Floating Outer Continental Shelf Facilities (as defined in... Commander. Vessels requiring Coast Guard inspection include Mobile Offshore Drilling Units (MODUs), Floating... engage directly in oil and gas exploration or production in the offshore waters of the Eighth Coast Guard...
78 FR 41689 - Safety Zone; Skagit River Bridge, Skagit River, Mount Vernon, WA
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-11
... Management Facility in Room W12-140 on the ground floor of the Department of Transportation West Building... email LTJG Nathaniel Clinger, Waterways Management Division, Coast Guard Sector Puget Sound; Coast Guard...; thence west back to the point of origin. Vessels wishing to enter the zone must request permission for...
76 FR 52338 - Information Collection Request to Office of Management and Budget
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-22
... Office of Management and Budget AGENCY: Coast Guard, DHS. ACTION: Sixty-day notice requesting comments... Information Collection Request (ICR) to the Office of Management and Budget (OMB), Office of Information and... Coast Guard docket number [USCG-2011-0750] to the Docket Management Facility (DMF) at the U.S...
5. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD ...
5. PHOTOCOPY OF DRAWINGS OF BUILDING #298, U.S. COAST GUARD SUPPORT CENTER, FACILITIES ENGINEERING DIVISION, NEW YORK, PLAN OF PALLADIAN (SOUTH) WINDOW DETAIL, CORBIN HALL, DRAWN BY J. COOK, JULY 28, 1938 - Governors Island, Half Moon Battery, New York Harbor near Comfort & Barry Roads, New York County, NY
30 CFR 75.1600-1 - Communication facilities; main portals; installation requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
..., and shall be installed either in a building or in a box-like structure designed to protect the facilities from damage by inclement weather. At least one of these communication facilities shall be at a...
30 CFR 75.1600-1 - Communication facilities; main portals; installation requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
..., and shall be installed either in a building or in a box-like structure designed to protect the facilities from damage by inclement weather. At least one of these communication facilities shall be at a...
30 CFR 75.1600-1 - Communication facilities; main portals; installation requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
..., and shall be installed either in a building or in a box-like structure designed to protect the facilities from damage by inclement weather. At least one of these communication facilities shall be at a...
30 CFR 75.1600-1 - Communication facilities; main portals; installation requirements.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., and shall be installed either in a building or in a box-like structure designed to protect the facilities from damage by inclement weather. At least one of these communication facilities shall be at a...
30 CFR 75.1600-1 - Communication facilities; main portals; installation requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., and shall be installed either in a building or in a box-like structure designed to protect the facilities from damage by inclement weather. At least one of these communication facilities shall be at a...
Factors influencing resident's decision to reside in gated and guarded community
NASA Astrophysics Data System (ADS)
Shamsudin, Zarina; Shamsudin, Shafiza; Zainal, Rozlin
2017-10-01
Gated communities are residential areas developed with restricted access with strictly controlled entrances and surrounded by a close perimeter of wall or fences. Developers, conscious of the need to fulfill the requirement of living in modern and sophisticated lifestyle and gated properties become the trend and mushroomed over the past decade. Nowadays, it is obvious that gated and guarded communities become almost a dominant feature of Malaysia housing development projects. The focus of this paper is to identify the factors contribute resident's decision to reside in gated and guarded community and to study social interaction among gated communities' residents. 150 questionnaires were distributed to the residents of selected gated and guarded community area in order to achieve the objectives and analyzed by using Statistical Package for Social Science (SPSS) and descriptive analysis. The result was tabulated and presented in charts and graphs for a clear and better understanding. The five main factors contribute to resident decision to reside in gated communities were identified and ranked; there are privacy, security, location, lifestyle and prestige. Besides, the residents are feeling neutral towards the facilities and services provided in their gated and guarded residential area. A comprehensive improvement towards the facilities and services is needed to reach higher satisfaction from the residents.
The Otis Weather Test Facility at Otis ANGB, Falmouth, MA : an aviation weather resource
DOT National Transportation Integrated Search
2004-10-06
The Otis Weather Test Facility (WTF) is located on the US Air National Guard Base, Cape Cod, MA. The Facility was originally established by the US Air Force Cambridge Research Laboratory [now Air Force Research Laboratory (AFRL)] in 1974 to develop a...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-01
... to Facility Vulnerability Assessments and the Integration of Security Systems AGENCY: Coast Guard...-sharing measures. Security System Integration Alternatives Require each MTSA-regulated facility owner or... other forms of security system integration. Information Requested 1. We request comments on the...
Code of Federal Regulations, 2014 CFR
2014-07-01
... installing facilities described in my approved SAP, COP, or GAP? 585.700 Section 585.700 Mineral Resources... approved SAP, COP, or GAP? (a) You must submit the following reports to BOEM before installing facilities described in your approved COP (§ 585.632(a)) and, when required by this part, your SAP (§ 585.614(b)) or...
Code of Federal Regulations, 2012 CFR
2012-07-01
... installing facilities described in my approved SAP, COP, or GAP? 585.700 Section 585.700 Mineral Resources... approved SAP, COP, or GAP? (a) You must submit the following reports to BOEM before installing facilities described in your approved COP (§ 585.632(a)) and, when required by this part, your SAP (§ 585.614(b)) or...
Code of Federal Regulations, 2013 CFR
2013-07-01
... installing facilities described in my approved SAP, COP, or GAP? 585.700 Section 585.700 Mineral Resources... approved SAP, COP, or GAP? (a) You must submit the following reports to BOEM before installing facilities described in your approved COP (§ 585.632(a)) and, when required by this part, your SAP (§ 585.614(b)) or...
Code of Federal Regulations, 2011 CFR
2011-07-01
....65 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE POLLUTION FINANCIAL RESPONSIBILITY AND COMPENSATION OIL SPILL LIABILITY: STANDARDS FOR CONDUCTING ALL...
Code of Federal Regulations, 2014 CFR
2014-07-01
....65 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE POLLUTION FINANCIAL RESPONSIBILITY AND COMPENSATION OIL SPILL LIABILITY: STANDARDS FOR CONDUCTING ALL...
Code of Federal Regulations, 2012 CFR
2012-07-01
....65 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE POLLUTION FINANCIAL RESPONSIBILITY AND COMPENSATION OIL SPILL LIABILITY: STANDARDS FOR CONDUCTING ALL...
Code of Federal Regulations, 2013 CFR
2013-07-01
....65 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE POLLUTION FINANCIAL RESPONSIBILITY AND COMPENSATION OIL SPILL LIABILITY: STANDARDS FOR CONDUCTING ALL...
USCG Oily Water Separator System Cartridge Usage Data Survey
1976-03-01
where a separate system is installed). 3. What spaces that have bilge water are not piped? Non- oily spaces. 4. Is existing ships piping used...NO. 4305.2/12 00 CO o ÄS! USC6 OILY WATER SEPARATOR SYSTEM CARTRIDGE USAGE DATA SURVEY ROBERT L. SKEWES U. S. CfAST GUARD (6-DET-l) OFFIU... Oily Water Separator Systems installed were surveyed. These cutters range in size from 65 foot river buoy tenders to 378 foot high endurance
Multicylinder Diesel Engine Tests with Unstabilized Water-in-Fuel Emulsions
DOT National Transportation Integrated Search
1981-06-01
Two diesel engines representative of the four-stroke cycle and two-stroke cycle main propulsion units installed in U.S. Coast Guard WPB class cutters were operated in a test environment in an attempt to demonstrate significant fuel savings associated...
46 CFR 169.609 - Exhaust systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and... Machinery” and the following additional requirements: (a) All exhaust installations with pressures in excess of 15 pounds per square inch gage or employing runs passing through living or working spaces must...
46 CFR 169.609 - Exhaust systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and... Machinery” and the following additional requirements: (a) All exhaust installations with pressures in excess of 15 pounds per square inch gage or employing runs passing through living or working spaces must...
46 CFR 193.05-10 - Fixed fire extinguishing systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
....05-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH... provided for internal combustion engine installations in accordance with the following: (1) Enclosed spaces containing gasoline engines shall have fixed carbon dioxide systems. (2) If a fire extinguishing system is...
46 CFR 193.05-10 - Fixed fire extinguishing systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
....05-10 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH... provided for internal combustion engine installations in accordance with the following: (1) Enclosed spaces containing gasoline engines shall have fixed carbon dioxide systems. (2) If a fire extinguishing system is...
46 CFR 129.360 - Semiconductor-rectifier systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Semiconductor-rectifier systems. 129.360 Section 129.360 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.360 Semiconductor-rectifier systems. (a) Each...
46 CFR 129.360 - Semiconductor-rectifier systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Semiconductor-rectifier systems. 129.360 Section 129.360 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.360 Semiconductor-rectifier systems. (a) Each...
46 CFR 129.370 - Equipment grounding.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Equipment grounding. 129.370 Section 129.370 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.370 Equipment grounding. (a) On a metallic vessel...
46 CFR 129.370 - Equipment grounding.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Equipment grounding. 129.370 Section 129.370 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.370 Equipment grounding. (a) On a metallic vessel...
46 CFR 129.360 - Semiconductor-rectifier systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Semiconductor-rectifier systems. 129.360 Section 129.360 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.360 Semiconductor-rectifier systems. (a) Each...
46 CFR 129.370 - Equipment grounding.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Equipment grounding. 129.370 Section 129.370 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.370 Equipment grounding. (a) On a metallic vessel...
46 CFR 183.230 - Temperature ratings.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Temperature ratings. 183.230 Section 183.230 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.230 Temperature ratings. Temperature ratings of electrical...
46 CFR 183.230 - Temperature ratings.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Temperature ratings. 183.230 Section 183.230 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.230 Temperature ratings. Temperature ratings of electrical...
46 CFR 183.230 - Temperature ratings.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Temperature ratings. 183.230 Section 183.230 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.230 Temperature ratings. Temperature ratings of electrical...
46 CFR 183.230 - Temperature ratings.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Temperature ratings. 183.230 Section 183.230 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.230 Temperature ratings. Temperature ratings of electrical...
46 CFR 183.230 - Temperature ratings.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Temperature ratings. 183.230 Section 183.230 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION General Requirements § 183.230 Temperature ratings. Temperature ratings of electrical...
30 CFR 250.1628 - Design, installation, and operation of production systems.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Systems (as incorporated by reference in § 250.198); (3) Electrical system information including a plan of... Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as... for Electrical Installations at Petroleum Facilities Classified as Class I, Zone 0, Zone 1, and Zone 2...
30 CFR 250.1628 - Design, installation, and operation of production systems.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Systems (as incorporated by reference in § 250.198); (3) Electrical system information including a plan of... Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as... for Electrical Installations at Petroleum Facilities Classified as Class I, Zone 0, Zone 1, and Zone 2...
30 CFR 250.1628 - Design, installation, and operation of production systems.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Systems (as incorporated by reference in § 250.198); (3) Electrical system information including a plan of... Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as... for Electrical Installations at Petroleum Facilities Classified as Class I, Zone 0, Zone 1, and Zone 2...
23 CFR 660.519 - Missile installations and facilities.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Missile installations and facilities. 660.519 Section... OPERATIONS SPECIAL PROGRAMS (DIRECT FEDERAL) Defense Access Roads § 660.519 Missile installations and...). (1) To implement 23 U.S.C. 210(h), DOD must make the determination that a contractor for a missile...
23 CFR 660.519 - Missile installations and facilities.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Missile installations and facilities. 660.519 Section... OPERATIONS SPECIAL PROGRAMS (DIRECT FEDERAL) Defense Access Roads § 660.519 Missile installations and...). (1) To implement 23 U.S.C. 210(h), DOD must make the determination that a contractor for a missile...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-12
... DEPARTMENT OF HOMELAND SECURITY Coast Guard [USCG-2011-1074] Information Collection Request to... Guard docket number [USCG-2011-1074] to the Docket Management Facility (DMF) at the U.S. Department of..., [USCG-2011-1074], and must be received by February 10, 2012. We will post all comments received, without...
76 FR 19380 - Notice of Entry Into Effect of MARPOL Annex V Wider Caribbean Region Special Area
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-07
... Effect of MARPOL Annex V Wider Caribbean Region Special Area AGENCY: Coast Guard, DHS. ACTION: Notice... for the Prevention of Pollution from Ships (MARPOL) Annex V, Regulation 5 and Coast Guard regulations. MARPOL Annex V and the U.S. regulations apply to vessel and reception facility activities in the WCR...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-16
... disagreement with the Coast Guard's recommendation would submit their own comments and information to the... comments on the actions of Federal employees who enforce, or otherwise determine compliance with, Federal... responsiveness to small business. If you wish to comment on actions by employees of the Coast Guard, call 1-888...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-02
... Review by Office of Management and Budget: OMB Control Number: 1625-0008 AGENCY: Coast Guard, DHS. ACTION..., Office of Management and Budget (OMB), Office of Information and Regulatory Affairs (OIRA), requesting... by Coast Guard docket number [USCG-2010-0978] to the Docket Management Facility (DMF) at the U.S...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-15
... Review by Office of Management and Budget: OMB Control Number: 1625-0073 AGENCY: Coast Guard, DHS. ACTION..., Office of Management and Budget (OMB), Office of Information and Regulatory Affairs (OIRA), requesting an... comments identified by Coast Guard docket number [USCG-2010-0981] to the Docket Management Facility (DMF...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-10
... Office of Management and Budget; OMB Control Number: 1625-0109 AGENCY: Coast Guard, DHS. ACTION: Sixty....S. Coast Guard intends to submit an Information Collection Request (ICR) to the Office of Management...-0158] to the Docket Management Facility (DMF) at the U.S. Department of Transportation (DOT). To avoid...
Latest update of tests and improvements to US Coast Guard viscous oil pumping system.
Drieu, Michael D; Nourse, Peter C; MacKay, Ronald; Cooper, David A; Hvidbak, Flemming
2003-01-01
Over the past nine years, the US Coast Guard has incorporated the prevention through people (PTP) philosophy as a "human factors" approach to learn how maritime operations can be regulated safer and be more efficient by evaluating training, management policies, operational procedures, and establishing partnerships with the maritime industry. One of the key elements of applying a PTP approach is identifying and incorporating lessons learned from major marine casualties and pollution incidents. Since 1997, the US Coast Guard National Strike Force has responded to three major oil spills involving foreign freight vessels grounding, which included the removal of highly viscous oil using various lightering equipment and systems. An informal workgroup consisting of the US Coast Guard, US Navy Supervisor of Salvage (NAVSUPSALV), and various representatives from oil pollution clean-up companies met at the following facilities: the Chevron Asphalt Facility in Edmonds, WA (September 1999), the Oil and Hazardous Materials Simulated Environmental Test Tank (OHMSETT) testing facility in Leonardo, New Jersey (November 1999 and March 2000), the Alaska Clean Seas (ACS) warehouse annex in Prudhoe Bay, AK (October 2000), and Cenac Towing Company facility in Houma, LA (May 2002). The group shared ideas and techniques, and tested different pumps and hose lengths with viscous oil. It was during the early tests that the first quantitative results showed just how efficient lubricated transport of heavy oil product could be, and broadened the knowledge of such methods to the entire industry. Although this technology had existed for many years in the oil production and handling industry, its use had never been investigated in a laboratory setting with regard to salvage response lightering systems.
30 CFR 585.701 - What must I include in my Facility Design Report?
Code of Federal Regulations, 2014 CFR
2014-07-01
... design or installation, e.g., oceanographic and soil reports including the results of the surveys... 30 Mineral Resources 2 2014-07-01 2014-07-01 false What must I include in my Facility Design... Facility Design, Fabrication, and Installation Reports § 585.701 What must I include in my Facility Design...
30 CFR 585.701 - What must I include in my Facility Design Report?
Code of Federal Regulations, 2013 CFR
2013-07-01
... design or installation, e.g., oceanographic and soil reports including the results of the surveys... 30 Mineral Resources 2 2013-07-01 2013-07-01 false What must I include in my Facility Design... Facility Design, Fabrication, and Installation Reports § 585.701 What must I include in my Facility Design...
30 CFR 585.701 - What must I include in my Facility Design Report?
Code of Federal Regulations, 2012 CFR
2012-07-01
... design or installation, e.g., oceanographic and soil reports including the results of the surveys... 30 Mineral Resources 2 2012-07-01 2012-07-01 false What must I include in my Facility Design... Facility Design, Fabrication, and Installation Reports § 585.701 What must I include in my Facility Design...
33 CFR 126.30 - What are the conditions for conducting welding and hotwork?
Code of Federal Regulations, 2010 CFR
2010-07-01
... conducting welding and hotwork? 126.30 Section 126.30 Navigation and Navigable Waters COAST GUARD, DEPARTMENT... FACILITIES § 126.30 What are the conditions for conducting welding and hotwork? (a) The facility operator must ensure that all welding or hotwork conducted at the facility meets the requirements of this...
DOT National Transportation Integrated Search
1997-11-06
Gretna and Governor Nicholls Light facilities are two manned shore side : facilities mounted in critical areas on the banks of the Mississippi River in : the port of New Orleans, Louisiana. Coast Guard plans call for the lights to : be remotely contr...
33 CFR 158.133 - Which ports and terminals must provide reception facilities?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Which ports and terminals must provide reception facilities? 158.133 Section 158.133 Navigation and Navigable Waters COAST GUARD..., AND GARBAGE General § 158.133 Which ports and terminals must provide reception facilities? (a) A port...
33 CFR 158.133 - Which ports and terminals must provide reception facilities?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Which ports and terminals must provide reception facilities? 158.133 Section 158.133 Navigation and Navigable Waters COAST GUARD..., AND GARBAGE General § 158.133 Which ports and terminals must provide reception facilities? (a) A port...
33 CFR 158.133 - Which ports and terminals must provide reception facilities?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Which ports and terminals must provide reception facilities? 158.133 Section 158.133 Navigation and Navigable Waters COAST GUARD..., AND GARBAGE General § 158.133 Which ports and terminals must provide reception facilities? (a) A port...
78 FR 35593 - Special Local Regulation; Christmas Boat Parade, San Juan Harbor; San Juan, PR
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-13
...: Docket Management Facility (M-30), U.S. Department of Transportation, West Building Ground Floor, Room... Coast Guard when it is received at the Docket Management Facility. We recommend that you include your... the line associated with this rulemaking. You may also visit the Docket Management Facility in Room...
33 CFR 105.415 - Amendment and audit.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Amendment and audit. 105.415 Section 105.415 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MARITIME SECURITY MARITIME SECURITY: FACILITIES Facility Security Plan (FSP) § 105.415 Amendment and audit. (a) Amendments. (1) Amendments to a Facility Securit...
33 CFR 126.30 - What are the conditions for conducting welding and hotwork?
Code of Federal Regulations, 2012 CFR
2012-07-01
... conducting welding and hotwork? 126.30 Section 126.30 Navigation and Navigable Waters COAST GUARD, DEPARTMENT... FACILITIES § 126.30 What are the conditions for conducting welding and hotwork? (a) The facility operator must ensure that all welding or hotwork conducted at the facility meets the requirements of this...
33 CFR 126.30 - What are the conditions for conducting welding and hotwork?
Code of Federal Regulations, 2014 CFR
2014-07-01
... conducting welding and hotwork? 126.30 Section 126.30 Navigation and Navigable Waters COAST GUARD, DEPARTMENT... FACILITIES § 126.30 What are the conditions for conducting welding and hotwork? (a) The facility operator must ensure that all welding or hotwork conducted at the facility meets the requirements of this...
33 CFR 126.30 - What are the conditions for conducting welding and hotwork?
Code of Federal Regulations, 2011 CFR
2011-07-01
... conducting welding and hotwork? 126.30 Section 126.30 Navigation and Navigable Waters COAST GUARD, DEPARTMENT... FACILITIES § 126.30 What are the conditions for conducting welding and hotwork? (a) The facility operator must ensure that all welding or hotwork conducted at the facility meets the requirements of this...
33 CFR 126.30 - What are the conditions for conducting welding and hotwork?
Code of Federal Regulations, 2013 CFR
2013-07-01
... conducting welding and hotwork? 126.30 Section 126.30 Navigation and Navigable Waters COAST GUARD, DEPARTMENT... FACILITIES § 126.30 What are the conditions for conducting welding and hotwork? (a) The facility operator must ensure that all welding or hotwork conducted at the facility meets the requirements of this...
33 CFR 159.71 - Electrical controls and conductors.
Code of Federal Regulations, 2010 CFR
2010-07-01
... conductors. 159.71 Section 159.71 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND... Electrical controls and conductors. Electrical controls and conductors must be installed in accordance with good marine practice. Wire must be copper and must be stranded. Electrical controls and conductors must...
33 CFR 159.71 - Electrical controls and conductors.
Code of Federal Regulations, 2011 CFR
2011-07-01
... conductors. 159.71 Section 159.71 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND... Electrical controls and conductors. Electrical controls and conductors must be installed in accordance with good marine practice. Wire must be copper and must be stranded. Electrical controls and conductors must...
46 CFR 169.678 - Main distribution panels and switchboards.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Section 169.678 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or...) Each switchboard must have front and, if accessible from the back, rear non-conducting hand rails...
46 CFR 169.678 - Main distribution panels and switchboards.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Section 169.678 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or...) Each switchboard must have front and, if accessible from the back, rear non-conducting hand rails...
46 CFR 169.678 - Main distribution panels and switchboards.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Section 169.678 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or...) Each switchboard must have front and, if accessible from the back, rear non-conducting hand rails...
46 CFR 183.370 - General grounding requirements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false General grounding requirements. 183.370 Section 183.370 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.370 General grounding...
46 CFR 129.323 - Multiple generators.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Multiple generators. 129.323 Section 129.323 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.323 Multiple generators. If an OSV uses two or more...
46 CFR 183.378 - Ungrounded systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Ungrounded systems. 183.378 Section 183.378 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.378 Ungrounded systems. Each ungrounded...
46 CFR 129.326 - Dual-voltage generators.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Dual-voltage generators. 129.326 Section 129.326 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.326 Dual-voltage generators. If a dual-voltage...
46 CFR 183.378 - Ungrounded systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Ungrounded systems. 183.378 Section 183.378 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.378 Ungrounded systems. Each ungrounded...
46 CFR 129.323 - Multiple generators.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Multiple generators. 129.323 Section 129.323 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.323 Multiple generators. If an OSV uses two or more...
46 CFR 183.360 - Semiconductor rectifier systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Semiconductor rectifier systems. 183.360 Section 183.360 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.360 Semiconductor rectifier...
46 CFR 129.323 - Multiple generators.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Multiple generators. 129.323 Section 129.323 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.323 Multiple generators. If an OSV uses two or more...
46 CFR 183.324 - Dual voltage generators.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Dual voltage generators. 183.324 Section 183.324 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.324 Dual voltage generators...
46 CFR 129.326 - Dual-voltage generators.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Dual-voltage generators. 129.326 Section 129.326 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.326 Dual-voltage generators. If a dual-voltage...
46 CFR 183.360 - Semiconductor rectifier systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Semiconductor rectifier systems. 183.360 Section 183.360 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.360 Semiconductor rectifier...
46 CFR 183.324 - Dual voltage generators.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Dual voltage generators. 183.324 Section 183.324 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.324 Dual voltage generators...
46 CFR 129.326 - Dual-voltage generators.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Dual-voltage generators. 129.326 Section 129.326 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.326 Dual-voltage generators. If a dual-voltage...
46 CFR 129.323 - Multiple generators.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Multiple generators. 129.323 Section 129.323 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.323 Multiple generators. If an OSV uses two or more...
46 CFR 129.323 - Multiple generators.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Multiple generators. 129.323 Section 129.323 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.323 Multiple generators. If an OSV uses two or more...
46 CFR 129.320 - Generators and motors.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Generators and motors. 129.320 Section 129.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.320 Generators and motors. (a) Each generator and...
46 CFR 129.320 - Generators and motors.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Generators and motors. 129.320 Section 129.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.320 Generators and motors. (a) Each generator and...
46 CFR 183.324 - Dual voltage generators.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Dual voltage generators. 183.324 Section 183.324 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.324 Dual voltage generators...
46 CFR 183.324 - Dual voltage generators.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Dual voltage generators. 183.324 Section 183.324 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.324 Dual voltage generators...
46 CFR 183.360 - Semiconductor rectifier systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Semiconductor rectifier systems. 183.360 Section 183.360 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.360 Semiconductor rectifier...
46 CFR 129.320 - Generators and motors.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Generators and motors. 129.320 Section 129.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.320 Generators and motors. (a) Each generator and...
46 CFR 183.370 - General grounding requirements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false General grounding requirements. 183.370 Section 183.370 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.370 General grounding...
46 CFR 129.326 - Dual-voltage generators.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Dual-voltage generators. 129.326 Section 129.326 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.326 Dual-voltage generators. If a dual-voltage...
46 CFR 129.560 - Engine-order telegraphs.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Engine-order telegraphs. 129.560 Section 129.560 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Miscellaneous Electrical Systems § 129.560 Engine-order telegraphs. No OSV need carry an engine...
46 CFR 182.130 - Alternative standards.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Alternative standards. 182.130 Section 182.130 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) MACHINERY INSTALLATION General Provisions § 182.130 Alternative standards. As an alternative to complying...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false General. 111.15-1 Section 111.15-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-1 General. Each battery...
46 CFR 129.510 - Lifeboat winches.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Lifeboat winches. 129.510 Section 129.510 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Miscellaneous Electrical Systems § 129.510 Lifeboat winches. Each lifeboat winch operated by electric power must...
46 CFR 129.510 - Lifeboat winches.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Lifeboat winches. 129.510 Section 129.510 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Miscellaneous Electrical Systems § 129.510 Lifeboat winches. Each lifeboat winch operated by electric power must...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false General. 169.601 Section 169.601 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical... and installation of machinery on sailing school vessels. (b) Machinery must be suitable in type and...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false General. 169.601 Section 169.601 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical... and installation of machinery on sailing school vessels. (b) Machinery must be suitable in type and...
46 CFR 183.520 - Lifeboat winches.
Code of Federal Regulations, 2010 CFR
2010-10-01
... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Miscellaneous Systems and Requirements § 183.520 Lifeboat winches. Each electric power operated lifeboat winch must meet, 111.95 in subchapter J and § 160.015 in subchapter Q of this...
46 CFR 129.560 - Engine-order telegraphs.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Engine-order telegraphs. 129.560 Section 129.560 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Miscellaneous Electrical Systems § 129.560 Engine-order telegraphs. No OSV need carry an engine...
46 CFR 129.560 - Engine-order telegraphs.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Engine-order telegraphs. 129.560 Section 129.560 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Miscellaneous Electrical Systems § 129.560 Engine-order telegraphs. No OSV need carry an engine...
46 CFR 129.560 - Engine-order telegraphs.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Engine-order telegraphs. 129.560 Section 129.560 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Miscellaneous Electrical Systems § 129.560 Engine-order telegraphs. No OSV need carry an engine...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false General. 111.15-1 Section 111.15-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-1 General. Each battery...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false General. 111.15-1 Section 111.15-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-1 General. Each battery...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false General. 111.15-1 Section 111.15-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-1 General. Each battery...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false General. 111.15-1 Section 111.15-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Storage Batteries and Battery Chargers: Construction and Installation § 111.15-1 General. Each battery...
1987-07-01
Raritan Formation and the Magothy Formation. The Raritan Formation, which rests on the bedrock, is subdivided into the Lloyd Sand Member and the clay...member, which is the uppermost part. The Raritan Formation is below sea level. The Magothy Formation outcrops at only a few locations on Long Island...the Magothy , and the Lloyd Sand member of the Raritan Formation. These aquifers are made up of sand and gravel and small amounts of silt and clay
1989-11-01
at a Superfund site in Puerto Rico to ascertain the alleged extent of mercury contamination. C.C. Johnson & Malhotra. P.C. (1985-1988): Environmental...industrial hygiene and training, as well as other environmental matters. 3 DETOX , Inc. (1986): Manager, Technical Services Responsible for the...computer and CAD operations, and company R&D efforts. DETOX , Inc. (1985-1986): Eastern Regional Manager As regional manager for the eastern United
1988-12-01
nuclear disintegration of certain elements and isotopes, with the emission of radiation, radiant energy capable of affecting living tissue. RADIUM - A...Corrosion Control. Waste oils, recovered fuels , spent cleaners, strippers, and solvents are * generated by these shops. ES-i mIs- Interviews with past...HAS-73) A defueling pit is located north of the old alert hangar (Building No. 241). Excess JP-4 fuel in the F-100 aircraft was dumped into the pit
Code of Federal Regulations, 2014 CFR
2014-01-01
... furnishing and installing signs concerning smoking restrictions in the building, and in and around building... PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.335 Who is responsible for furnishing and installing signs concerning smoking restrictions in the building, and in and around building...
Code of Federal Regulations, 2012 CFR
2012-01-01
... furnishing and installing signs concerning smoking restrictions in the building, and in and around building... PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.335 Who is responsible for furnishing and installing signs concerning smoking restrictions in the building, and in and around building...
Code of Federal Regulations, 2011 CFR
2011-01-01
... furnishing and installing signs concerning smoking restrictions in the building, and in and around building... PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.335 Who is responsible for furnishing and installing signs concerning smoking restrictions in the building, and in and around building...
Code of Federal Regulations, 2013 CFR
2013-07-01
... furnishing and installing signs concerning smoking restrictions in the building, and in and around building... PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.335 Who is responsible for furnishing and installing signs concerning smoking restrictions in the building, and in and around building...
Code of Federal Regulations, 2010 CFR
2010-07-01
... furnishing and installing signs concerning smoking restrictions in the building, and in and around building... PROPERTY 74-FACILITY MANAGEMENT Facility Management Smoking § 102-74.335 Who is responsible for furnishing and installing signs concerning smoking restrictions in the building, and in and around building...
78 FR 17781 - Transportation Worker Identification Credential (TWIC)-Reader Requirements
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-22
...In this Notice of Proposed Rulemaking (NPRM), the Coast Guard proposes to require owners and operators of certain vessels and facilities regulated by the Coast Guard to use electronic readers designed to work with the Transportation Worker Identification Credential (TWIC) as an access control measure. This NPRM also proposes additional requirements associated with electronic TWIC readers, including recordkeeping requirements for those owners and operators required to use an electronic TWIC reader, and security plan amendments to incorporate TWIC requirements. The TWIC program, including the proposed TWIC reader requirements in this rule, is an important component of the Coast Guard's multi-layered system of access control requirements and other measures designed to enhance maritime security. This rulemaking action, once final, would build upon existing Coast Guard regulations designed to ensure that only individuals who hold a TWIC are granted unescorted access to secure areas at those locations. The Coast Guard has already promulgated regulations pursuant to the Maritime Transportation Security Act of 2002 (MTSA) that require mariners and other individuals to obtain a TWIC and present it for inspection by security personnel prior to gaining access to such secure areas. By requiring certain vessels and facilities to perform TWIC inspections using electronic TWIC readers, this rulemaking would further enhance security at those locations. This rulemaking would also implement the Security and Accountability For Every Port Act of 2006 electronic TWIC reader requirements.
Experts advise hospitals to heed warning signs, leverage security to prepare against shootings.
2014-09-01
While hospital shootings are not commonplace, studies suggest they are happening with increasing frequency, and that EDs are particularly vulnerable to this type of violence. Researchers report that roughly a third of all hospital shootings occur in the emergency setting. Experts say such incidents are typically targeted events, not random acts. Consequently, effective security programs should emphasize preventive steps to defuse potentially volatile situations and prevent weapons from entering the facility. Hospital security departments should be equipped to provide training to employees throughout the facility so that employees know how to respond if an active shooter is identified. Researchers report that between 2000 and 2012 there were 154 shootings in American hospitals, and that the frequency of these events increased markedly in the later years of the study. Experts say hospital shootings may involve disgruntled patients, dementia patients, or psychiatric patients, but the most common perpetrators are prisoners who are brought into the hospital for treatment under guard. Security experts say effective safety plans should focus on identifying threatening language or other signs of agitation early on so that interventions can be employed. They also advise hospitals to install gun lockers at every entrance point so that lawful weapons can be stored before owners enter the facility. Liberalized gun laws in some regions are making security more difficult at public hospitals. Also, hospitals need to be careful with surveillance activities that could raise privacy concerns.
2005-09-01
Facilities Layout o Scope problem with client in terms of options for M&S facilities layouts with regards to infrastructure, personnel... Facilities Layout o Develop M&S Installation Facilities Layout Design(s) Requirements and Milestones: • Scope problem with client (systems on which...objectives of this study are to (a) identify the desired technology and facilities layouts which would enhance inter-installation simulation
46 CFR 108.177 - Electrical equipment in classified locations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Electrical equipment in classified locations. 108.177 Section 108.177 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE... equipment in classified locations. Electrical equipment and devices installed in spaces made non-hazardous...
46 CFR 182.540 - Ballast systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Ballast systems. 182.540 Section 182.540 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) MACHINERY INSTALLATION Bilge and Ballast Systems § 182.540 Ballast systems. (a) Ballast piping must not be...
46 CFR 182.540 - Ballast systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Ballast systems. 182.540 Section 182.540 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) MACHINERY INSTALLATION Bilge and Ballast Systems § 182.540 Ballast systems. (a) Ballast piping must not be...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 3 2010-10-01 2010-10-01 false Application. 76.17-1 Section 76.17-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Foam Extinguishing Systems, Details § 76.17-1 Application. (a) Where a foam extinguishing system is installed, the...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 3 2011-10-01 2011-10-01 false Application. 76.17-1 Section 76.17-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Foam Extinguishing Systems, Details § 76.17-1 Application. (a) Where a foam extinguishing system is installed, the...
1984-01-01
from the north, thereby occasionally encouraging unseasonably warm temperatures. Unseasonably cold temperatures most often occur when the Bermuda...marl. Hawthorn 160 - Sandy phophatic marl and soft limestone with interbedded brittle -shale. 25 OLIGOCENE (Ta) Flint River 50 - Reddish-yellow sand
46 CFR 34.15-50 - Lockout valves-T/ALL.
Code of Federal Regulations, 2012 CFR
2012-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS FIREFIGHTING EQUIPMENT Carbon Dioxide... carbon dioxide extinguishing system protecting a space over 6,000 cubic feet in volume and installed or... or spaces, making it impossible for carbon dioxide to discharge in the event of equipment failure...
46 CFR 34.15-50 - Lockout valves-T/ALL.
Code of Federal Regulations, 2014 CFR
2014-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS FIREFIGHTING EQUIPMENT Carbon Dioxide... carbon dioxide extinguishing system protecting a space over 6,000 cubic feet in volume and installed or... or spaces, making it impossible for carbon dioxide to discharge in the event of equipment failure...
46 CFR 34.15-50 - Lockout valves-T/ALL.
Code of Federal Regulations, 2013 CFR
2013-10-01
... COAST GUARD, DEPARTMENT OF HOMELAND SECURITY TANK VESSELS FIREFIGHTING EQUIPMENT Carbon Dioxide... carbon dioxide extinguishing system protecting a space over 6,000 cubic feet in volume and installed or... or spaces, making it impossible for carbon dioxide to discharge in the event of equipment failure...
46 CFR 183.320 - Generators and motors.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Generators and motors. 183.320 Section 183.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.320 Generators and motors. (a) Each...
46 CFR 183.320 - Generators and motors.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Generators and motors. 183.320 Section 183.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.320 Generators and motors. (a) Each...
46 CFR 183.320 - Generators and motors.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Generators and motors. 183.320 Section 183.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.320 Generators and motors. (a) Each...
46 CFR 183.372 - Equipment and conductor grounding.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Equipment and conductor grounding. 183.372 Section 183.372 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.372 Equipment and...
46 CFR 183.320 - Generators and motors.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Generators and motors. 183.320 Section 183.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.320 Generators and motors. (a) Each...
46 CFR 183.320 - Generators and motors.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Generators and motors. 183.320 Section 183.320 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) SMALL PASSENGER VESSELS (UNDER 100 GROSS TONS) ELECTRICAL INSTALLATION Power Sources and Distribution Systems § 183.320 Generators and motors. (a) Each...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 3 2014-10-01 2014-10-01 false Application. 76.33-1 Section 76.33-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Smoke Detecting System, Details § 76.33-1 Application. (a) Where a smoke detecting system is installed, the...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 3 2011-10-01 2011-10-01 false Application. 76.33-1 Section 76.33-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Smoke Detecting System, Details § 76.33-1 Application. (a) Where a smoke detecting system is installed, the...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 3 2010-10-01 2010-10-01 false Application. 76.33-1 Section 76.33-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Smoke Detecting System, Details § 76.33-1 Application. (a) Where a smoke detecting system is installed, the...
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 3 2013-10-01 2013-10-01 false Application. 76.33-1 Section 76.33-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) PASSENGER VESSELS FIRE PROTECTION EQUIPMENT Smoke Detecting System, Details § 76.33-1 Application. (a) Where a smoke detecting system is installed, the...