Sample records for hamakua project final

  1. Sustainable biomass products development and evaluation, Hamakua project. Final draft report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1998-05-01

    The PICHTR Sustainable Biomass Energy Program was developed to evaluate the potential to cultivate crops for energy production as an alternative use of lands made available by the closing of large sugar plantations. In particular, the closing of the Hamakua Sugar Company on the island of Hawaii brought a great deal of attention to the future of agriculture in this region and in the state. Many options were proposed. Several promising alternatives had been proposed for cane lands. These included dedicated feedstock supply systems (DFSS) for electrical energy production, cultivation of sugarcane to produce ethanol and related by-products, and themore » production of feed and crops to support animal agriculture. Implementation of some of the options might require preservation of large tracts of land and maintenance of the sugar mills and sugar infrastructure. An analysis of the technical, financial, and other issues necessary to reach conclusions regarding the optimal use of these lands was required. At the request of the Office of State Planning and Senator Akaka`s office, the Pacific International Center for High Technology Research (PICHTR) established and coordinated a working group composed of state, county, federal, and private sector representatives to identify sustainable energy options for the use of idle sugar lands on the island of Hawaii. The Sustainable Biomass Energy Program`s Hamakua Project was established to complete a comprehensive evaluation of the most viable alternatives and assess the options to grow crops as a source of raw materials for the production of transportation fuel and/or electricity on the island of Hawaii. The motivation for evaluating biomass to energy conversion embraced the considerations that Hawaii`s energy security would be improved by diversifying the fuels used for transportation and reducing dependency on imported fossil fuels. The use of waste products as feedstocks could divert wastes from landfills.« less

  2. 40 CFR 409.60 - Applicability; description of the Hilo-Hamakua Coast of the Island of Hawaii raw cane sugar...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-Hamakua Coast of the Island of Hawaii raw cane sugar processing subcategory. 409.60 Section 409.60... PROCESSING POINT SOURCE CATEGORY Hilo-Hamakua Coast of the Island of Hawaii Raw Cane Sugar Processing Subcategory § 409.60 Applicability; description of the Hilo-Hamakua Coast of the Island of Hawaii raw cane...

  3. 40 CFR 409.60 - Applicability; description of the Hilo-Hamakua Coast of the Island of Hawaii raw cane sugar...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-Hamakua Coast of the Island of Hawaii raw cane sugar processing subcategory. 409.60 Section 409.60... PROCESSING POINT SOURCE CATEGORY Hilo-Hamakua Coast of the Island of Hawaii Raw Cane Sugar Processing Subcategory § 409.60 Applicability; description of the Hilo-Hamakua Coast of the Island of Hawaii raw cane...

  4. 40 CFR 409.60 - Applicability; description of the Hilo-Hamakua Coast of the Island of Hawaii raw cane sugar...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-Hamakua Coast of the Island of Hawaii raw cane sugar processing subcategory. 409.60 Section 409.60 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS SUGAR PROCESSING POINT SOURCE CATEGORY Hilo-Hamakua Coast of the Island of Hawaii Raw Cane Sugar Processing...

  5. 40 CFR 409.60 - Applicability; description of the Hilo-Hamakua Coast of the Island of Hawaii raw cane sugar...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-Hamakua Coast of the Island of Hawaii raw cane sugar processing subcategory. 409.60 Section 409.60 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS SUGAR PROCESSING POINT SOURCE CATEGORY Hilo-Hamakua Coast of the Island of Hawaii Raw Cane Sugar Processing...

  6. 40 CFR 409.60 - Applicability; description of the Hilo-Hamakua Coast of the Island of Hawaii raw cane sugar...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-Hamakua Coast of the Island of Hawaii raw cane sugar processing subcategory. 409.60 Section 409.60 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS SUGAR PROCESSING POINT SOURCE CATEGORY Hilo-Hamakua Coast of the Island of Hawaii Raw Cane Sugar Processing...

  7. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan to...

  8. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan to...

  9. The Amherst Project. Final Report.

    ERIC Educational Resources Information Center

    Hampshire Coll., Amherst, MA.

    This final report submitted by the Committee on the Study of History at Hampshire College describes the Amherst Project, a research and development project devoted to fostering the newer inquiry approaches in the study of United States history. The project's main focus has been on secondary schools, but has also encompassed junior high and adult…

  10. Project LIFE, 1963-1975. Final Report.

    ERIC Educational Resources Information Center

    Pfau, Glenn S.

    Presented is the final report on Project Life (Language Improvement to Facilitate Education), a 12-year (1963-75) project which developed filmstrips and supplementary materials for teaching language to deaf children. General overview and historical review sections include information on project goals and objectives, administration agencies and…

  11. The Trine Project Final Report.

    ERIC Educational Resources Information Center

    Gunderson, Jon R.; And Others

    The final report describes the Trine Project which addressed three needs in the education of handicapped children: the need for an alternate writing system, the need for communication, and the need for access to general purpose computers used in the schools. The project had three major objectives: (1) to design a low-cost portable writing and…

  12. Competency-Based Transfer Pilot Project--Final Report. Executive Summary [and] Competency-Based Transfer Pilot Project: Final Report on House Bill 1909

    ERIC Educational Resources Information Center

    Washington Higher Education Coordinating Board, 2006

    2006-01-01

    This publication contains the following: (1) Competency-Based Transfer Pilot Project--Final Report. Executive Summary (January 2006); and (2) Competency-Based Transfer Pilot Project: Final Report on House Bill 1909 (January 2005). In 2003, the legislature and governor enacted House Bill 1909 to create a pilot project on competency-based transfer…

  13. Final Project Report for Award ER65581

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stoy, Paul C.

    2017-07-13

    The attached final project report describes contributions of Montana State University (MSU) to the project "Bridging land-surface fluxes and aerosol concentrations to triggering convective rainfall" (PI: Fuentes).

  14. Mechanical Engineering Senior Design Project Final Presentations | College

    Science.gov Websites

    Mechanical Engineering Senior Design Project Final Presentations December 7, 2015 Mechanical Engineering On Wednesday, Dec. 9th, the mechanical engineering senior design project final presentations will be made in and Steven Keller Objective: Design a temperature controlled unit that would cool and maintain a

  15. 2+2+2 Dissemination Project Final Report.

    ERIC Educational Resources Information Center

    Sloane, Diana; And Others

    An overview is provided in this three-part final report of a project designed to disseminate information to assist California high schools, Regional Occupation Programs, and colleges in developing and strengthening 2+2+2 programs. Part I reviews the following project objectives: (1) hire a project coordinator and technical assistant; (2) develop a…

  16. Rural Textile Workers Literacy Enhancement Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Enterprise State Junior Coll., AL.

    This document consists of the final report and sample curricula from the Rural Textile Workers Literacy Enhancement Project. The final report details how the project was initiated in April 1993 to help employees of five textile and apparel manufacturing companies in southeastern Alabama improve their literacy and numeracy skills. A second…

  17. Multihandicapped Blind. Final Project Report.

    ERIC Educational Resources Information Center

    Jones, Lloyd

    The final report of the Garden Grove unified school district project for 1969 through 1972 (funded through Title III) involving six multiply handicapped, legally blind children, 7- to 10-years-old, who were previously excluded from special education (SE) classes is presented. Described as the main procedural objective is development of a…

  18. Interagency Planning and Support Project. Final Report.

    ERIC Educational Resources Information Center

    Salisbury, Christine

    This final report describes the activities and outcomes of a federally funded project designed to develop, implement, and evaluate a systemically oriented process model for improving the coordination of education and human services for young children with identified disabilities and their families at the local level. The project developed and used…

  19. Georgia Deaf-Blind Pilot Project: Project EPIC. Final Report. Optional Pilot Projects for Children with Deaf-Blindness.

    ERIC Educational Resources Information Center

    Georgia State Dept. of Education, Atlanta.

    This final report describes activities and accomplishments of Project EPIC (Effective Partner Interaction in the Community), a 3-year federally supported project in Georgia to facilitate the establishment and implementation of effective educational practices with students having deaf-blindness. The project was designed to expand students' present…

  20. Final Technical Report- Virginia Solar Pathways Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bond, Katharine; Cosby, Sarah

    This Report provides a technical review of the final results of a funding award to Virginia Electric and Power Company (Dominion Energy Virginia (DEV) or the Company) for a project under the U.S. Department of Energy’s Solar Energy Technologies Office. The three-year project was formally known as the Virginia Solar Pathways Project (VSPP or the Project). The purpose of the VSPP was to develop a collaborative utility-administered solar strategy (Solar Strategy) for DEV’s service territory in the Commonwealth that could serve as a replicable model for other states with similar policy environments.

  1. Minnesota Deaf-Blind Technical Assistance Project. Final Report.

    ERIC Educational Resources Information Center

    Kloos, Eric

    This final report describes activities and accomplishments of the 3-year federally supported Minnesota Deaf-Blind Technical Assistance Project. The project provided training and technical assistance, information sharing, and support services to families of children with deaf-blindness. Activities and accomplishments included: collaboration with…

  2. Advanced Air Transportation Technologies Project, Final Document Collection

    NASA Technical Reports Server (NTRS)

    Mogford, Richard H.; Wold, Sheryl (Editor)

    2008-01-01

    This CD ROM contains a compilation of the final documents of the Advanced Air Transportation Technologies (AAIT) project, which was an eight-year (1996 to 2004), $400M project managed by the Airspace Systems Program office, which was part of the Aeronautics Research Mission Directorate at NASA Headquarters. AAIT focused on developing advanced automation tools and air traffic management concepts that would help improve the efficiency of the National Airspace System, while maintaining or enhancing safety. The documents contained in the CD are final reports on AAIT tasks that serve to document the project's accomplishments over its eight-year term. Documents include information on: Advanced Air Transportation Technologies, Autonomous Operations Planner, Collaborative Arrival Planner, Distributed Air/Ground Traffic Management Concept Elements 5, 6, & 11, Direct-To, Direct-To Technology Transfer, Expedite Departure Path, En Route Data Exchange, Final Approach Spacing Tool - (Active and Passive), Multi-Center Traffic Management Advisor, Multi Center Traffic Management Advisor Technology Transfer, Surface Movement Advisor, Surface Management System, Surface Management System Technology Transfer and Traffic Flow Management Research & Development.

  3. Final-Year Projects as a Major Element in the IE Curriculum

    ERIC Educational Resources Information Center

    Vitner, G.; Rozenes, S.

    2009-01-01

    This paper presents a multi-perspective view of the final-year project of an industrial engineering and management (IEM) department. The final year project is a major element of a 4-year curriculum within any engineering discipline. Such a project gives the student an opportunity to use and implement methods, techniques and tools that he or she…

  4. Increasing Prediction the Original Final Year Project of Student Using Genetic Algorithm

    NASA Astrophysics Data System (ADS)

    Saragih, Rijois Iboy Erwin; Turnip, Mardi; Sitanggang, Delima; Aritonang, Mendarissan; Harianja, Eva

    2018-04-01

    Final year project is very important forgraduation study of a student. Unfortunately, many students are not seriouslydidtheir final projects. Many of studentsask for someone to do it for them. In this paper, an application of genetic algorithms to predict the original final year project of a studentis proposed. In the simulation, the data of the final project for the last 5 years is collected. The genetic algorithm has several operators namely population, selection, crossover, and mutation. The result suggest that genetic algorithm can do better prediction than other comparable model. Experimental results of predicting showed that 70% was more accurate than the previous researched.

  5. Hiilangaay Hydroelectric ProjectFinal Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Twitchell, Sara; Stimac, Michael; Lang, Lisa

    2016-06-01

    The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible tomore » move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy« less

  6. THe Case Method of Instruction (CMI) Project. Final Report.

    ERIC Educational Resources Information Center

    McWilliam, P. J.; And Others

    This final report describes the Case Method of Instruction (CMI) Project, a project to develop, field test, and disseminate training materials to facilitate the use of the Case Method of Instruction by inservice and preservice instructors in developmental disabilities. CMI project activities focused on developing a collection of case stories and…

  7. LYNX community advocacy & service engagement (CASE) project final report.

    DOT National Transportation Integrated Search

    2009-05-14

    This report is a final assessment of the Community Advocacy & Service Engagement (CASE) project, a LYNX-FTA research project designed : to study transit education and public engagement methods in Central Florida. In the Orlando area, as in other part...

  8. Implementation of Polyurea Applications for Wastewater System Corrosion-Mitigation Projects: Final Report on Project F15-AR04

    DTIC Science & Technology

    2017-07-24

    Corrosion-Mitigation Projects Final Report on Project F15-AR04 Co ns tr uc tio n En gi ne er in g R es ea rc h La bo ra to ry Clint A. Wilson...2017 Implementation of Polyurea Applications for Wastewater System Corrosion-Mitigation Projects Final Report on Project F15-AR04 Clint A...Secretary of Defense Washington, DC 20301-3090 Under Project F15-AR04, “Polyurea Coating for Rehabilitation of Concrete and Metal Infrastructure

  9. Admiralty Inlet Pilot Tidal Project Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Collar, Craig

    This document represents the final report for the Admiralty Inlet Pilot Tidal Project, located in Puget Sound, Washington, United States. The Project purpose was to license, permit, and install a grid-connected deep-water tidal turbine array (two turbines) to be used as a platform to gather operational and environmental data on tidal energy generation. The data could then be used to better inform the viability of commercial tidal energy generation from technical, economic, social, and environmental standpoints. This data would serve as a critical step towards the responsible advancement of commercial scale tidal energy in the United States and around themore » world. In late 2014, Project activities were discontinued due to escalating costs, and the DOE award was terminated in early 2015. Permitting, licensing, and engineering design activities were completed under this award. Final design, deployment, operation, and monitoring were not completed. This report discusses the results and accomplishments achieved under the subject award.« less

  10. Almost certain escape from black holes in final state projection models.

    PubMed

    Lloyd, Seth

    2006-02-17

    Recent models of the black-hole final state suggest that quantum information can escape from a black hole by a process akin to teleportation. These models rely on a controversial process called final-state projection. This Letter discusses the self-consistency of the final-state projection hypothesis and investigates escape from black holes for arbitrary final states and for generic interactions between matter and Hawking radiation. Quantum information escapes with fidelity approximately = (8/3pi)2: only half a bit of quantum information is lost on average, independent of the number of bits that escape from the hole.

  11. Arizona Deafblind Project, 1995-1999. Final Report.

    ERIC Educational Resources Information Center

    Arizona State School for the Deaf and Blind, Tucson.

    This final report describes accomplishments of the four-year federally funded Arizona Deafblind Project which attempted to: (1) identify all deafblind children in Arizona; (2) deliver technical assistance to families; (3) deliver technical assistance to service providers; and (4) enhance community oversight, coordination, and collaboration with…

  12. Final Design Report for the RH LLW Disposal Facility (RDF) Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Austad, Stephanie Lee

    2015-09-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  13. Final Design Report for the RH LLW Disposal Facility (RDF) Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Austad, S. L.

    2015-05-01

    The RH LLW Disposal Facility (RDF) Project was designed by AREVA Federal Services (AFS) and the design process was managed by Battelle Energy Alliance (BEA) for the Department of Energy (DOE). The final design report for the RH LLW Disposal Facility Project is a compilation of the documents and deliverables included in the facility final design.

  14. Nabisco Foods Division--"New Indy" Workplace Literacy Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Ivy Tech State Coll., Indianapolis, IN.

    This document contains a final report, evaluation, and curriculum materials from a project conducted at the RJR Nabisco plant in Indianapolis to upgrade the literacy and numeracy skills of the workers to facilitate technological changes to production lines. As the final report explains, although the goal of the project was to recruit and test 150…

  15. Special Education Evaluation Project for University Affiliated Facilities. Final Report.

    ERIC Educational Resources Information Center

    Burrello, Leonard C.; And Others

    The final report of the Special Education Evaluation Project for 16 University Affiliated Facilities (UAF) centers provides a chronological review of the project which focused on the training of persons to work with mentally retarded or other handicapped individuals. Outlined are project objectives including the development of descriptors useful…

  16. Evaluation of the Rural Math Excel Partnership Project Final Report

    ERIC Educational Resources Information Center

    Nagle, Katherine; Pratt-Williams, Jaunelle; Schmidt, Rebecca; Swantek, Cara; Lyulchenko, Marianna; McGhee, Raymond

    2016-01-01

    This is the final external evaluation report prepared by SRI International for the Rural Math Excel Partnership (RMEP) project, an investing in innovation (i3) development project funded by the U.S. Department of Education. Operated by Virginia Advanced Study Strategies, Inc. (VASS), the RMEP project included six rural school districts (LEAs) in…

  17. Science and Engineering Technician Curriculum Development Project. Final Report.

    ERIC Educational Resources Information Center

    Mowery, Donald R.; Wolf, Lawrence J.

    Project SET (Science and Engineering for Technicians) developed a series of study guides designed to teach generic science and engineering skills to students interested in becoming technicians. An entire 2-year curriculum is encompassed by these guides, geared for 2-year college students. Described in this final report are the project's rationale,…

  18. HUMAN DEVELOPMENT PROJECT, 1965-1966. FINAL REPORT.

    ERIC Educational Resources Information Center

    Richmond Public Schools, VA.

    THIS FINAL REPORT IS AN EVALUATION OF A COMPENSATORY EDUCATION PROJECT IN RICHMOND, VIRGINIA. DATA ARE DERIVED FROM TEACHERS' RESPONSES TO A QUESTIONNAIRE, FROM A REPORT ON THE ACADEMIC PERFORMANCE OF PUPILS IN THE 1965 SUMMER PROGRAM, AND FROM AN ANALYSIS OF STANDARDIZED ACHIEVEMENT TEST RESULTS IN EXPERIMENTAL AND CONTROL SCHOOLS. THE REPORT…

  19. Iowa Hill Pumped Storage Project Investigations - Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hanson, David

    2016-07-01

    This Final Technical Report is a summary of the activities and outcome of the Department of Energy (DOE) Assistance Agreement DE-EE0005414 with the Sacramento Municipal Utility District (SMUD). The Assistance Agreement was created in 2012 to support investigations into the Iowa Hill Pumped-storage Project (Project), a new development that would add an additional 400 MW of capacity to SMUD’s existing 688MW Upper American River Hydroelectric Project (UARP) in the Sierra Nevada mountains east of Sacramento, California.

  20. Project Developmental Continuity Evaluation: Final Report. Appendices to Volume I.

    ERIC Educational Resources Information Center

    Bond, James T.; And Others

    This document provides the appendices for volume 1 of the final evaluation report of Project Developmental Continuity (PDC), a Head Start demonstration project initiated in 1974 to develop program models which enhance children's social competence by fostering developmental continuity from preschool through the early elementary grades.…

  1. Project LEEDS: Leadership Education To Empower Disabled Students. Final Report.

    ERIC Educational Resources Information Center

    Aune, Betty; And Others

    This final report describes the activities of Project LEEDS (Leadership Education to Empower Disabled Students), a federally supported project designed to create student/staff teams from colleges and universities to encourage undergraduate/graduate students with disabilities to become leaders, through development of self-identity and identity with…

  2. Services for Children with Deaf-Blindness Pilot Project. Final Report.

    ERIC Educational Resources Information Center

    Stremel, Kathleen

    This final report describes a pilot project, "Quality Service Provision for Infants and Young Children with Deaf-Blindness: A Mechanism for State Intervention Teams," developed and implemented at the University of Southern Mississippi. The project developed a model of an intervention team that provides intensive training and technical…

  3. Selection and Validation of Model Early Childhood Projects: Final Report.

    ERIC Educational Resources Information Center

    Stock, John R.; And Others

    Presented is the final report of a research program to select and describe outstanding Handicapped Children's Early Education Program (HCEEP) projects. Projects were analyzed in terms of 14 components of an HCEEP program (such as screening, programing, and inservice training). A detailed discussion of model selection and validation is appendixed.)…

  4. The Choctaw Home-Centered Family Education Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    Quigley, Patrick A.; And Others

    The final report of the four-year (1972-1976) Choctaw Family Education Project identifies the major goal, "to demonstrate a workable early childhood model for rural reservation groups," and consists of an executive summary, a comprehensive report, and a personalized report. Objectives of the project, carried out in 6 Choctaw reservation…

  5. Using Insider Research in MEd Final Projects to Bridge the Theory/Practice Gap

    ERIC Educational Resources Information Center

    Arar, Khalid

    2018-01-01

    This paper aims to identify key issues involved in MEd final project supervision and to highlight the potential of supervision from an academic institution to change educational reality through the postgraduate student-teachers' work-based final project as insider researchers in Israeli schools. It draws on analysis of case-study data from two…

  6. 76 FR 38134 - Final Priorities; Disability and Rehabilitation Research Projects and Centers Program-Disability...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-29

    ...-identified research designs to generate reliable and valid findings. Changes: None. Final Priorities Priority... DEPARTMENT OF EDUCATION Final Priorities; Disability and Rehabilitation Research Projects and Centers Program--Disability Rehabilitation Research Projects, etc. AGENCY: Office of Special Education and...

  7. Georgia Deaf-Blind Project. Final Report, 1992-1995. State and Multi-State Projects for Children with Deaf-Blindness.

    ERIC Educational Resources Information Center

    Georgia State Dept. of Education, Atlanta.

    This final report describes activities and accomplishments of the Georgia Deaf-Blind Project, a 3-year federally supported project encompassing 159 counties and providing technical assistance to 237 infants, children, and youth with deaf-blindness along with their families and their service providers. Project accomplishments included: (1) more…

  8. Final-Year Education Projects for Undergraduate Chemistry Students

    ERIC Educational Resources Information Center

    Page, Elizabeth

    2011-01-01

    The Undergraduate Ambassadors Scheme provides an opportunity for students in their final year of the chemistry degree course at the University of Reading to choose an educational project as an alternative to practical research. The undergraduates work in schools where they can be regarded as role models and offer one way of inspiring pupils to…

  9. The Early Childhood Interactive Technology Literacy Curriculum Project: A Final Report.

    ERIC Educational Resources Information Center

    Hutinger, Patricia; Robinsosn, Linda; Schneider, Carol; Johanson, Joyce

    This final report describes the activities and outcomes of the Interactive Technology Literacy Curriculum (ITLC) project. This federally funded 5-year model demonstration project was designed to advance the availability, quality, use and effectiveness of computer technology in addressing the acquisition of emergent literacy among young children…

  10. The LiveWire Project final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brown, C.D.; Nelson, T.T.; Kelly, J.C.

    Utilities across the US have begun pilot testing a variety of hardware and software products to develop a two-way communications system between themselves and their customers. Their purpose is to reduce utility operating costs and to provide new and improved services for customers in light of pending changes in the electric industry being brought about by deregulation. A consortium including utilities, national labs, consultants, and contractors, with the support of the Department of Energy (DOE) and the Electric Power Research Institute (EPRI), initiated a project that utilized a hybrid fiber-coax (HFC) wide-area network integrated with a CEBus based local areamore » network within the customers home. The system combined energy consumption data taken within the home, and home automation features to provide a suite of energy management services for residential customers. The information was transferred via the Internet through the HFC network, and presented to the customer on their personal computer. This final project report discusses the design, prototype testing, and system deployment planning of the energy management system.« less

  11. Standards Improvement Project-Phase II. Final rule.

    PubMed

    2005-01-05

    The Occupational Safety and Health Administration (OSHA) through this final rule is continuing to remove and revise provisions of its standards that are outdated, duplicative, unnecessary, or inconsistent, or can be clarified or simplified by being written in plain language. The Agency completed Phase I of the Standards Improvement Project in June 1998. In this Phase II of the Standards Improvement Project, OSHA is again revising or removing a number of health provisions in its standards for general industry, shipyard employment, and construction. The Agency believes that the changes streamline and make more consistent the regulatory requirements in OSHA health and safety standards. In some cases, OSHA has made substantive revisions to requirements because they are outdated, duplicative, unnecessary, or inconsistent with more recently promulgated health standards. The Agency believes these revisions will reduce regulatory requirements for employers without reducing employee protection.

  12. El Paso County Geothermal Project at Fort Bliss. Final Project Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lear, Jon; Bennett, Carlon; Lear, Dan

    The El Paso County Geothermal Project at Fort Bliss was an effort to determine the scale and scope of geothermal resources previously identified on Fort Bliss’ McGregor Range in southern Otero County, New Mexico. The project was funded with a $5,000,000 grant to El Paso County from the U.S. Department of Energy (DOE) as part of the American Recovery and Reinvestment Act of 2009 and a $4,812,500 match provided by private sector partners. The project was administered through the DOE Golden Field Office to awardee El Paso County. The primary subcontractor to El Paso County and project Principal Investigator -more » Ruby Mountain Inc. (RMI) of Salt Lake City, Utah - assembled the project team consisting of Evergreen Clean Energy Management (ECEM) of Provo, Utah, and the Energy & Geoscience Institute at the University of Utah (EGI) in Salt Lake City, UT to complete the final phases of the project. The project formally began in May of 2010 and consisted of two preliminary phases of data collection and evaluation which culminated in the identification of a drilling site for a Resource Confirmation Well on McGregor Range. Well RMI 56-5 was drilled May and June 2013 to a depth of 3,030 ft. below ground level. A string of slotted 7 inch casing was set in 8.75 inch hole on bottom fill at 3,017 ft. to complete the well. The well was drilled using a technique called flooded reverse circulation, which is most common in mineral exploration. This technique produced an exceptionally large and complete cuttings record. An exciting development at the conclusion of drilling was the suspected discovery of a formation that has proven to be of exceptionally high permeability in three desalinization wells six miles to the south. Following drilling and preliminary testing and analysis, the project team has determined that the McGregor Range thermal anomaly is large and can probably support development in the tens of megawatts.« less

  13. Pacific Basin Deaf-Blind Project. State & Multi State Projects for Children with Deaf-Blindness. Final Report, 1992-1995.

    ERIC Educational Resources Information Center

    Kelly, Dotty; Guerrero, Vincent Leon

    This final report describes activities and accomplishments of the Pacific Basin Deaf-Blind Project, a 3-year federally funded project to provide technical assistance to public and private agencies, institutions, and organizations providing early intervention, educational, transitional, vocational, early identification, and related services to…

  14. Tom Green County Library Literacy Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Vavricka, D. Karen

    The final report of the Tom Green Country Library System (Texas) literacy project details progress toward achievement of 11 objectives. Objectives of the literacy outreach program were to: (1) increase Hispanic enrollment; (2) increase Black enrollment; (3) provide free child care for 4 students to attend 50 tutoring sessions; (4) provide…

  15. Skills Conversion Project: Chapter 2, Executive Summary. Final Report.

    ERIC Educational Resources Information Center

    National Society of Professional Engineers, Washington, DC.

    This final report describes the Skills Conversion Project conducted by The National Society of Professional Engineers under contract to the Department of Labor to study methods of utilizing the large pool of highly skilled unemployed technicians and professional personnel who were formerly employed in the aerospace and defense industries. If…

  16. Final report on the maintenance asset management project : phase II.

    DOT National Transportation Integrated Search

    2013-07-01

    Iowa Department of Transportation (IA DOT) is finalizing research to streamline field inventory/inspection of culverts by Maintenance and Construction staff while maximizing the use of tablet technologies. The project began in 2011 to develop some ne...

  17. On the design of learning outcomes for the undergraduate engineer's final year project

    NASA Astrophysics Data System (ADS)

    Thambyah, Ashvin

    2011-03-01

    The course for the final year project for engineering students, because of its strongly research-based, open-ended format, tends to not have well defined learning outcomes, which are also not aligned with any accepted pedagogical philosophy or learning technology. To address this problem, the revised Bloom's taxonomy table of Anderson and Krathwohl (2001) is utilised, as suggested previously by Lee and Lai (2007), to design new learning outcomes for the final year project course in engineering education. Based on the expectations of the engineering graduate, and integrating these graduate expectations into the six cognitive processes and four knowledge dimensions of the taxonomy table, 24 learning outcomes have been designed. It is proposed that these 24 learning outcomes be utilised as a suitable working template to inspire more critical evaluation of what is expected to be learnt by engineering students undertaking final year research or capstone projects.

  18. High/Scope Outreach Project. Final Report. October 1, 1983-September 30, 1984.

    ERIC Educational Resources Information Center

    High/Scope Educational Research Foundation, Ypsilanti, MI.

    The final report reviews accomplishments of an outreach project designed to provide technical assistance and training to early childhood programs for handicapped children. The project features the Cognitively Oriented Preschool Curriculum, a developmental approach based on Piagetian theory and explained to build on the child's accomplishments. A…

  19. Hawaii Demonstration Project to Avert Unintended Teenage Pregnancy: 1978-1982. Final Report. Executive Summary.

    ERIC Educational Resources Information Center

    Levitt-Merin, Marta; Sutter, Sharon Kingdon

    This final report provides a descriptive overview of three approaches which the Hawaii Demonstration Project initiated to reduce unintended teenage pregnancies. Project evaluation findings are summarized; both qualitative and quantitative data are presented for a comprehensive picture of the project and its input. Project limitations and successes…

  20. Illinois State Project: Services for Children with Deaf-Blindness Program. Final Performance Report.

    ERIC Educational Resources Information Center

    Dorsey, Christine

    This final report describes activities and accomplishments of the Illinois state project on services for children with deaf-blindness, a 3-year federally supported project to address the needs of children (ages birth to 21) who are deaf-blind. Project activities included inservice training and technical assistance, development of a comprehensive…

  1. Final Scientific Report - Wind Powering America State Outreach Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sinclair, Mark; Margolis, Anne

    2012-02-01

    The goal of the Wind Powering America State Outreach Project was to facilitate the adoption of effective state legislation, policy, finance programs, and siting best practices to accelerate public acceptance and development of wind energy. This was accomplished by Clean Energy States Alliance (CESA) through provision of informational tools including reports and webinars as well as the provision of technical assistance to state leaders on wind siting, policy, and finance best practices, identification of strategic federal-state partnership activities for both onshore and offshore wind, and participation in regional wind development collaboratives. The Final Scientific Report - Wind Powering America Statemore » Outreach Project provides a summary of the objectives, activities, and outcomes of this project as accomplished by CESA over the period 12/1/2009 - 11/30/2011.« less

  2. Development of Home Health Aide Curriculum Project. Final Report.

    ERIC Educational Resources Information Center

    Brown, Patricia

    This package contains materials intended for use in a new home health aide curriculum that is designed to be presented as a two-quarter program at Tacoma Community College in Tacoma, Washington. Included in the package are a final report outlining the objectives and outcomes of the project to develop a home health aide curriculum that would meet…

  3. Faculty College. Final Project Report, July 1, 1976 through June 30, 1978.

    ERIC Educational Resources Information Center

    Wisconsin Univ., Oshkosh.

    The final report of a faculty development project, sponsored by the Fund for the Improvement of Postsecondary Education, is presented. Project objectives were to: augment the existing Faculty College programming with special focus sessions, featuring national leaders who would treat issues in one of the developing areas of the institution; bring…

  4. The Elder Abuse Prevention Project, Phase Two, Three and Four. Final Report.

    ERIC Educational Resources Information Center

    Regina Univ. (Saskatchewan). Univ. Extension. Seniors Education Centre.

    This document presents the final report from an educational and community development program designed to raise awareness about the abuse and neglect of the elderly. The Elder Abuse Prevention Project is briefly described in terms of project goals, objectives, the model used, the target groups served, and the evaluation processes employed. It is…

  5. 40. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii, T.H. GENERAL VIEW OT THE PROJECT SHOWING CONSPICUOUS SCARS. THE BEFORE PHOTO OF A BEFORE AND AFTER SET. AFTER PHOTO IS HI-52-41. - Haleakala National Park Roads, Pukalani, Maui County, HI

  6. 77 FR 67662 - Notice of Availability of the Desert Harvest Solar Project Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-13

    ... decommission a solar photovoltaic electricity generating facility with a proposed output of 150 megawatts and a... CACA 49491] Notice of Availability of the Desert Harvest Solar Project Final Environmental Impact...) Plan Amendment and Final Environmental Impact Statement (EIS) for the Desert Harvest Solar Project and...

  7. Navy Career Education Diffusion Project: State of Oregon. Final Report.

    ERIC Educational Resources Information Center

    McDermott, Michael M.

    The final report describes a project to research, develop, and field test Navy occupational information for inclusion into the Oregon Career Information System (CIS), a computer-assisted career education program. Five sections include: (1) introductory information; (2) a discussion of the preparation of Navy occupational information and reviewing…

  8. SELF (Supports for Early Learning Foundations): A Non-Directed Model Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    Harrison, Holly

    This final report describes achievements and activities of Project SELF (Supports for Early Learning Foundations), a federally funded project in New Mexico which developed, evaluated, and replicated an innovative model that provides strategies for early interventionists and families to support early learning foundations. The project identified…

  9. Studies in Bilingual Evaluation, Work Unit I: Bilingual Prediction Project. Final Report.

    ERIC Educational Resources Information Center

    de Porcel, Antonio; And Others

    The final report of the Bilingual Prediction Project presents a review of the project from its inception in 1975 through completion in 1979. The main goal was to predict a student's academic ability in English. A prediction index was constructed in two stages. The first stage was a description of the target population and their school setting, as…

  10. Zachary-Fort Lauderdale pipeline construction and conversion project: final supplement to final environmental impact statement. Docket No. CP74-192

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This Final Supplement to the Final Environmental Impact Statement (Final Supplement) evaluates the economic, engineering, and environmental aspects of newly developed alternatives to an abandonment/conversion project proposed by Florida Gas Transmission Company (Florida Gas). It also updates the staff's previous FEIS and studies revisions to the original proposal. Wherever possible, the staff has adopted portions of its previous FEIS in lieu of reprinting portions of that analysis which require no change. 60 references, 8 figures, 35 tables.

  11. Palmdale Energy Project; Final Decision; Prevention of Significant Deterioration (PSD) Permit

    EPA Pesticide Factsheets

    EPA Region 9 is issuing a final decision to grant conditional approval, in accordance with the Clean Air Act, for the construction of a natural gas-fired combined cycle power plant known as the Palmdale Energy Project.

  12. Northeast Oregon Hatchery Project, Final Siting Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Watson, Montgomery

    1995-03-01

    This report presents the results of site analysis for the Bonneville Power Administration Northeast Oregon Hatchery Project. The purpose of this project is to provide engineering services for the siting and conceptual design of hatchery facilities for the Bonneville Power Administration. The hatchery project consists of artificial production facilities for salmon and steelhead to enhance production in three adjacent tributaries to the Columbia River in northeast Oregon: the Grande Ronde, Walla Walla, and Imnaha River drainage basins. Facilities identified in the master plan include adult capture and holding facilities; spawning incubation, and early rearing facilities; full-term rearing facilities; and directmore » release or acclimation facilities. The evaluation includes consideration of a main production facility for one or more of the basins or several smaller satellite production facilities to be located within major subbasins. The historic and current distribution of spring and fall chinook salmon and steelhead was summarized for the Columbia River tributaries. Current and future production and release objectives were reviewed. Among the three tributaries, forty seven sites were evaluated and compared to facility requirements for water and space. Site screening was conducted to identify the sites with the most potential for facility development. Alternative sites were selected for conceptual design of each facility type. A proposed program for adult holding facilities, final rearing/acclimation, and direct release facilities was developed.« less

  13. 76 FR 12096 - McCloud-Pit Project; Notice of Availability of the Final Environmental Impact Statement for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... Project; Notice of Availability of the Final Environmental Impact Statement for the Mccloud-Pit... Pit Rivers in Shasta County, California and has prepared a final environmental impact statement (EIS... and the alternatives for relicensing the McCloud-Pit Project. The final EIS documents the views of...

  14. Project Target: Criterion-Referenced Physical Fitness Standards for Adolescents with Disabilities. Final Report.

    ERIC Educational Resources Information Center

    Winnick, Joseph P.; Short, Francis X.

    This final report discusses the outcomes of a project designed to extend the nation's current emphasis on health-related, criterion-referenced fitness testing and programming to children and adolescents with disabilities. It summarizes project activities leading up to the Brockport Physical Fitness Test and related measures. Activities included:…

  15. The Indiana Deafblind Services Project: Services for Children with Deafblindness Program. Final Performance Report.

    ERIC Educational Resources Information Center

    Indiana State Univ., Terre Haute. Blumberg Center for Interdisciplinary Studies in Special Education.

    This final report describes activities and accomplishments of the Indiana Deaf-Blind Services Project, a 4-year federally funded project to enhance and further develop coordinated direct services to children and youth, birth through 2 and ages 18 through 21. The project also was designed to provide technical assistance to public and private…

  16. Griffith Energy Project Final Environmental Impact Statement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    1999-04-02

    Griffith Energy Limited Liability Corporation (Griffith) proposes to construct and operate the Griffith Energy Project (Project), a natural gas-fuel, combined cycle power plant, on private lands south of Kingman, Ariz. The Project would be a ''merchant plant'' which means that it is not owned by a utility and there is currently no long-term commitment or obligation by any utility to purchase the capacity and energy generated by the power plant. Griffith applied to interconnect its proposed power plant with the Western Area Power Administration's (Western) Pacific Northwest-Pacific Southwest Intertie and Parker-Davis transmission systems. Western, as a major transmission system owner,more » needs to provide access to its transmission system when it is requested by an eligible organization per existing policies, regulations and laws. The proposed interconnection would integrate the power generated by the Project into the regional transmission grid and would allow Griffith to supply its power to the competitive electric wholesale market. Based on the application, Western's proposed action is to enter into an interconnection and construction agreement with Griffith for the requested interconnections. The proposed action includes the power plant, water wells and transmission line, natural gas pipelines, new electrical transmission lines and a substation, upgrade of an existing transmission line, and access road to the power plant. Construction of segments of the transmission lines and a proposed natural gas pipeline also require a grant of right-of-way across Federal lands administered by the Bureau of Land Management. Public comments on the Draft EIS are addressed in the Final EIS, including addenda and modifications made as a result of the comments and/or new information.« less

  17. 76 FR 56973 - Office of National Marine Sanctuaries Final Policy and Permit Guidance for Submarine Cable Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... National Marine Sanctuaries Final Policy and Permit Guidance for Submarine Cable Projects AGENCY: Office of National Marine Sanctuaries (ONMS), National Oceanic and Atmospheric Administration (NOAA), Department of... Marine Sanctuaries (ONMS) has developed final policy and permitting guidance for submarine cable projects...

  18. Expressive Arts Project for Young Children with Disabilities. Final Report.

    ERIC Educational Resources Information Center

    Hutinger, Patricia L.

    This final report describes activities and accomplishments of the Expressive Arts Project for Young Children with Disabilities, which developed and evaluated a CD-ROM, ArtSpace. The program, developed on a Macintosh platform, allows the child to either view or make art. It offers real time video, music especially produced to accompany images,…

  19. Using a Multimedia Final Project in an IT Ethics Course

    ERIC Educational Resources Information Center

    Howard, Elizabeth V.; Woods, David M.

    2016-01-01

    In previous semesters of our IT Ethics course, students created traditional final projects where they presented some topic in IT Ethics that we did not cover during the course. Students were free to choose how they would present their information with most groups choosing a traditional presentation where some members of the group were clearly…

  20. Leading Curriculum Innovation in Primary Schools Project: A Final Report

    ERIC Educational Resources Information Center

    Brundrett, Mark; Duncan, Diane

    2015-01-01

    This article provides the final report on a research project that investigated the ways in which curriculum innovation can be led successfully in primary schools. Data gathering included 40 semi-structured interviews in 10 successful primary schools in England of varying sizes and types and in a range of geographical and social locations. Findings…

  1. 'Advancement of KHPS to DOE TRL 7/8' Project - Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Adonizio, Mary Ann; Corren, Dean; Smith, Ron

    Final Report describing activities performed under the 'Advancement of the KHPS to DOE TRL 7/8' project, including the development of critical component test protocols, testing and analysis of the Gen5 KHPS main shaft seal, and continuing compliance work on approved operational environmental monitoring plans in anticipation of KHPS turbine installation at Verdant Power's Roosevelt Island Tidal Energy (RITE) Project site in New York, NY.

  2. 76 FR 67178 - Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2149-152] Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement for the Wells... application for license for the Wells Hydroelectric Project (FERC No. 2149), located on the Columbia River in...

  3. Staff Helping Attain Relevant Education (Project SHARE): Final Evaluation Report, 1992-93. OREA Report.

    ERIC Educational Resources Information Center

    Ranadive, Jyoti

    Project SHARE (Staff Helping Attain Relevant Education), a project funded by Title VII of the Elementary and Secondary Education Act, was in its third and final year of operation in 1992-93, in eight primary schools in the Bronx, Brooklyn, and Manhattan (New York). The project served 141 limited English proficient students from low-income families…

  4. 77 FR 30514 - Native Hawaiian Career and Technical Education Program; Final Waiver and Extension of Project Period

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... DEPARTMENT OF EDUCATION Native Hawaiian Career and Technical Education Program; Final Waiver and.... ACTION: Notice. Overview Information Final Waiver and Extension of Project Period for the Native Hawaiian.... SUMMARY: For 36-month projects funded in fiscal year (FY) 2009 under the Native Hawaiian Career and...

  5. 75 FR 7029 - Notice of Availability of the Final Environmental Assessment for Solar Roof Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-16

    ... Assessment for Solar Roof Project AGENCY: United States Geological Survey. ACTION: Notice of availability... Final Environmental Assessment for the Solar Roof Project and by this notice is announcing its... Individuals wishing to receive copies of the Environmental Assessment for the Solar Roof Project should...

  6. 38. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. BRIDGE AT STATION 85+. - Haleakala National Park Roads, Pukalani, Maui County, HI

  7. Final Technical Report, Wind Generator Project (Ann Arbor)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Geisler, Nathan

    A Final Technical Report (57 pages) describing educational exhibits and devices focused on wind energy, and related outreach activities and programs. Project partnership includes the City of Ann Arbor, MI and the Ann Arbor Hands-on Museum, along with additional sub-recipients, and U.S. Department of Energy/Office of Energy Efficiency and Renewable Energy (EERE). Report relays key milestones and sub-tasks as well as numerous graphics and images of five (5) transportable wind energy demonstration devices and five (5) wind energy exhibits designed and constructed between 2014 and 2016 for transport and use by the Ann Arbor Hands-on Museum.

  8. 36. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. TYPICAL RUBBLE MASONRY HEADWALL AND BOX CULVERT. - Haleakala National Park Roads, Pukalani, Maui County, HI

  9. 76 FR 19744 - Final Tropic to Hatch 138 kV Transmission Line Project Environmental Impact Statement and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-08

    ... DEPARTMENT OF AGRICULTURE Forest Service Final Tropic to Hatch 138 kV Transmission Line Project..., has prepared a Final Environmental Impact Statement (FEIS) for the Tropic to Hatch 138 kV Transmission.... ADDRESSES: Copies of the Tropic to Hatch 138 kV Transmission Line Project FEIS/PMPA for the Grand Staircase...

  10. Supervisors' Perceptions of Research Competencies in the Final-Year Project

    ERIC Educational Resources Information Center

    Reguant, Mercedes; Martínez-Olmo, Francesc; Contreras-Higuera, Williams

    2018-01-01

    Background: This paper analyses the development of research competencies in higher education students, particularly with regard to the undergraduate Final-Year Project (FYP). The FYP is understood as an assignment that requires the integration of learning outcomes and demonstration of competencies for the successful completion of the degree.…

  11. CBSS Outreach Project: Computer-Based Study Strategies for Students with Learning Disabilities. Final Report.

    ERIC Educational Resources Information Center

    Anderson-Inman, Lynne; Ditson, Mary

    This final report describes activities and accomplishments of the four-year Computer-Based Study Strategies (CBSS) Outreach Project at the University of Oregon. This project disseminated information about using computer-based study strategies as an intervention for students with learning disabilities and provided teachers in participating outreach…

  12. 35. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. LOOKING BACK FROM STATION 335 AT RETURN CURVE. - Haleakala National Park Roads, Pukalani, Maui County, HI

  13. Vocational Evaluation and Work Adjustment Bulletin; Vol. 8, Special Edition: Vocational Evaluation Project Final Report Part 1.

    ERIC Educational Resources Information Center

    Vocational Evaluation and Work Adjustment Association, Washington, DC.

    The first of three parts of the Vocational Evaluation Project final report contains an editorial, two task force reports, and brief summaries of the seven task force reports which comprise the final report. The editorial summarizes the project's purpose, its activities for the three years of its existence, and its results, and describes the task…

  14. Project Continuity: A Handicapped Children's Early Education Project. Final Report, October 1, 1986 to September 30, 1989.

    ERIC Educational Resources Information Center

    Jackson, Barbara; Quinn, Judy

    The final report describes Project Continuity, a federally funded effort to provide continuity of care for handicapped infants with chronic illness or complex medical needs while in the acute care setting and to facilitate transition of the infant into the home environment. Goals were accomplished within the context of a family-centered…

  15. 78 FR 57264 - Final Waiver and Extension of the Project Period for the Technical Assistance Coordination Center

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-18

    ...: 84.326Z.] Final Waiver and Extension of the Project Period for the Technical Assistance Coordination... project period. SUMMARY: The Secretary waives the requirements in the Education Department General Administrative Regulations that generally prohibit project periods exceeding five years and extensions of project...

  16. Classrooms beyond School Walls for Grades K-12. Mamaroneck Career Education Project. Final Report.

    ERIC Educational Resources Information Center

    Mamaroneck Union Free School District 1, NY.

    This document contains two reports on the Classrooms beyond Walls Career Education Project conducted by the Mamaroneck Union Free School District and the Sound Consortium for grades K-12 in the 1975-76 school year. The final report summarizes the project's major objectives (increasing self-awareness and decision-making skills, training teachers in…

  17. 37. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. HAND-LAID ROCK BERM ON RETURN CURVE TO PREVENT SCOUR AND SEEPAGE THROUGH FILLS. - Haleakala National Park Roads, Pukalani, Maui County, HI

  18. Research and Development Project in Career Education. Final Report. Volume III.

    ERIC Educational Resources Information Center

    Washington State Coordinating Council for Occupational Education, Olympia.

    The final volume in the report on the Research and Development Project in Career Education is in two parts. The first, "Interest Inventories, Tests, Surveys, and Scales: A Compilation," is by James T. Jurgens. It is designed to acquaint teachers and counselors with 66 interest measurement instruments that are presently on the market. For most,…

  19. Project Future Workplace Literacy Project. Final Performance Report.

    ERIC Educational Resources Information Center

    Jefferson County Public Schools, Louisville, KY.

    Project Future was a 3-year project begun in 1994 as a partnership between the Jefferson County Public Schools and Futura Plastics and Engineering, Inc., Louisville, Kentucky. The project targeted the workplace basic skills of plastic injection molding production workers. The skills classes improved the general education of the workers with…

  20. 77 FR 66480 - Final Environmental Impact Statement, Narrows Project, Sanpete County, Utah

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-05

    ... availability. SUMMARY: We, the Bureau of Reclamation, announce the availability of the final environmental impact statement on the Narrows Project, a non- Federal dam and reservoir proposed by the Sanpete Water... Availability of Weekly Receipt of Environmental Impact Statements in the Federal Register. This notice, usually...

  1. 39. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii, T.H., by Merel S. Sager, Resident Landscape Architect, April 16, 1935. COVERING CONSPICOUS ROCK FILLS WITH SOIL. - Haleakala National Park Roads, Pukalani, Maui County, HI

  2. The CDCC's Project No. 7: "The Education and Cultural Development of Migrants." Final Report of the Project Group.

    ERIC Educational Resources Information Center

    Council for Cultural Cooperation, Strasbourg (France).

    The final report of a project group representing the 18 member countries of the Council of Europe Council for Cultural Co-operation investigates education and cultural development of migrants. The report discusses methodology and reasons for selecting an intercultural approach to migrant education in terms of interculturalism's basic elements:…

  3. Project Developmental Continuity Evaluation: Final Report. Volume II: The Process of Program Implementation in PDC.

    ERIC Educational Resources Information Center

    Wacker, Sally; And Others

    The second of two volumes, this document continues the final evaluation report of Project Developmental Continuity (PDC), a Head Start demonstration project initiated in 1974 to develop program models which enhance children's social competence by fostering developmental continuity from preschool through the early elementary grades. In particular,…

  4. Project to Incorporate Anthropological Concepts of Human Diversity in Secondary School Social Studies Curricula (Project Anthropology). Final Report, 2/1/80 to 1/31/82.

    ERIC Educational Resources Information Center

    Giannangelo, Duane M.; And Others

    Learning modules emphasizing the anthropological aspects of human and race relations to supplement social studies textbooks used in grades 7-12 were developed. The final report describes pre-project activities, module development, and project evaluation and accomplishments. Pre-project activities included media publicity, reviewing social studies…

  5. Project CREATE Final Report. Cooperative Resources To Enhance Access to Technology Education.

    ERIC Educational Resources Information Center

    Hampden County Employment and Training Consortium, Springfield, MA.

    These materials have been developed by Project CREATE (Cooperative Resources to Enhance Access to Jobs through Technical Education), a demonstration program designed to develop a network, specific activities, and resources that would provide education and support services to a wide audience. A 13-page final report describes the hands-on training…

  6. School Age Multihandicapped Project: Capital Area Rehabilitation Center. Final Report 1977-1980.

    ERIC Educational Resources Information Center

    Capital Area Rehabilitation Center, Austin, TX.

    The document contains the final report of a model project to provide a therapeutically based educational program for severely handicapped, orthopedically impaired children (6 to 21 years old) utilizing the skills of teachers, aides, therapists, and a nurse to provide individualized hands on services. Section I contains an overview of the…

  7. 78 FR 45268 - Notice of Availability of the San Diego Gas & Electric Ocotillo Sol Solar Project Final...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-26

    ... decommission the Ocotillo Sol Solar Project, a solar photovoltaic (PV) power plant facility, on approximately... Applicant's Proposed Project to construct, operate, maintain, and decommission a 100-acre solar PV facility...] Notice of Availability of the San Diego Gas & Electric Ocotillo Sol Solar Project Final Environmental...

  8. Building a Network of Services: 1963-1971. Final Report: Greater Cleveland Mental Retardation Development Project.

    ERIC Educational Resources Information Center

    Buckman, Rilma Oxley

    The final report documents the Greater Cleveland Mental Retardation Development Project, a 5-year demonstration project concerned with solving such problems as how a community can provide all the services and programs needed by the retarded and their families, ensure successful and appropriate employment, and staff and finance such programs.…

  9. The Collaborative Planning Outreach Project: Building Comprehensive Early Childhood Systems. Final Report.

    ERIC Educational Resources Information Center

    Smith, Barbara J.

    This final report describes the objectives, activities and outcomes of a federally funded initiative to train and assist early childhood interagency teams in a model of planning systems and services for all young children, including children with disabilities and other special needs. The project is based on the value of stakeholder ownership in…

  10. Through Shared Windows: Outreach Project for Infants, Toddlers, and Children with Developmental Disabilities. Final Report.

    ERIC Educational Resources Information Center

    Harrison, Holly

    This final report describes activities and accomplishments of the Through Shared Windows (TSW) Outreach Project, a 4-year project at the University of New Mexico designed to improve services to young children with disabilities and their families. Three major outcomes were accomplished. First, a Web site was developed that focuses on observational…

  11. 77 FR 23740 - Sears Point Wetland and Watershed Restoration Project, Sonoma County, CA; Final Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-20

    ...We, the U.S. Fish and Wildlife Service (Service) and the California Department of Fish and Game (CDFG), in cooperation with the Sonoma Land Trust (SLT), announce that a final environmental impact report and environmental impact statement (EIR/EIS) for the Sears Point Wetland and Watershed Restoration Project is now available. The final EIR/EIS, which we prepared and now announce in accordance with the National Environmental Policy Act of 1969 (NEPA), describes the restoration of approximately 2,300 acres (ac) of former farmland located in Sonoma County, California, near the San Pablo Bay. The final EIR/EIS responds to all comments we received on the draft document. The restoration project, which would be implemented by the SLT, would restore natural estuarine ecosystems on diked baylands, while providing public access and recreational and educational opportunities compatible with ecological and cultural resources protection. The U.S. Army Corps of Engineers, San Francisco District, and the National Marine Fisheries Service of the National Oceanic and Atmospheric Administration are cooperating agencies on the final EIR/EIS.

  12. Description of the supporting factors of final project in Mathematics and Natural Sciences Faculty of Syiah Kuala University with multiple correspondence analysis

    NASA Astrophysics Data System (ADS)

    Rusyana, Asep; Nurhasanah; Maulizasari

    2018-05-01

    Syiah Kuala University (Unsyiah) is hoped to have graduates who are qualified for working or creating a field of work. A final project course implementation process must be effective. This research uses data from the evaluation conducted by Mathematics and Natural Sciences Faculty (FMIPA) of Unsyiah. Some of the factors that support the completion of the final project are duration, guidance, the final project seminars, facility, public impact, and quality. This research aims to know the factors that have a relationship with the completion of the final project and identify similarities among variables. The factors that support the completion of the final project at every study program in FMIPA are (1) duration, (2) guidance and (3) facilities. These factors are examined for the correlations by chi-square test. After that, the variables are analyzed with multiple correspondence analysis. Based on the plot of correspondence, the activities of the guidance and facilities in Informatics Study Program are included in the fair category, while the guidance and facilities in the Chemistry are included in the best category. Besides that, students in Physics can finish the final project with the fastest completion duration, while students in Pharmacy finish for the longest time.

  13. Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Collar, Craig W

    2012-11-16

    others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.« less

  14. 76 FR 10938 - Notice of Final Federal Agency Actions on Sunrise Project, I-205 to Rock Creek Junction...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-28

    ... on Sunrise Project, I-205 to Rock Creek Junction: Clackamas County, OR AGENCY: Federal Highway.... 139(l)(1). The actions relate to a proposed highway project, Sunrise Project, I-205 to Rock Creek... Project, I-205 to Rock Creek Junction Final Environmental Impact Statement, Record of Decision and other...

  15. Final Report for NIREC Renewable Energy Research & Development Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Borland, Walt

    This report is a compilation of progress reports and presentations submitted by NIREC to the DOE’s Solar Energy Technologies Office for award number DE-FG36-08GO88161. This compilation has been uploaded to OSTI by DOE as a substitute for the required Final Technical Report, which was not submitted to DOE by NIREC or received by DOE. Project Objective: The primary goal of NIREC is to advance the transformation of the scientific innovation of the institutional partner’s research in renewable energy into a proof of the scientific concept eventually leading to viable businesses with cost effective solutions to accelerate the widespread adoption ofmore » renewable energy. NIREC will a) select research projects that are determined to have significant commercialization potential as a result of vetting by the Technology and commercialization Advisory Board, b) assign an experienced Entrepreneur-in-Residence (EIR) to each manage the scientific commercialization-preparedness process, and c) facilitate connectivity with venture capital and other private-sector capital sources to fund the rollout, scaling and growth of the resultant renewable energy business.« less

  16. Career Development Project. [Ogden, Utah City School District]. Final Report and Evaluation.

    ERIC Educational Resources Information Center

    Drechsel, Lionel

    Covering the time period of October 1972 to May 1974, the final report documents the efforts of a career education project in the Ogden City School District. In the elementary grades the program stressed the importance of work and workers and introduced some very basic careers. On the junior and senior high school levels, a career guidance and…

  17. 34. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    34. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii, H.L. Handley, Assistant Highway Engineer, March 30, 1935. NOTE HOW THE LOCATION FITS THE CONTOUR OF THE HILL. LOOKING FROM STATION 382+00 ON HALEAKALA HIGHWAY. - Haleakala National Park Roads, Pukalani, Maui County, HI

  18. Aerobic Excercise and Research Opportunities to Benefit Impaired Children. (Project AEROBIC). Final Report.

    ERIC Educational Resources Information Center

    Idaho Univ., Moscow.

    The final report summarizes accomplishments of Project AEROBIC (Aerobic Exercise and Research Opportunities to Benefit Impaired Children), which provided a physical education exercise program for severely, profoundly, and multiply handicapped children aged 10-21. Activities are outlined for the 3 year period and include modification of exercise…

  19. Project S.P.I.C.E.: Special Partnership in Career Education. Final Report.

    ERIC Educational Resources Information Center

    Emerson, Debby H.; And Others

    The final report discusses Project SPICE (Special Partnership in Career Education) which produced a career awareness curriculum consisting of an implementation guide, and six teaching modules intended for use with educable mentally handicapped students (ages 11-to-13 years). Noted are the following program objectives (based on the National…

  20. Development of a Secondary School Physics Program: Harvard Project Physics. Volume 2, More Appendices. Final Report.

    ERIC Educational Resources Information Center

    Holton, Gerald; And Others

    As appendices to the final report on Project Physics (SE 015 500), this volume includes parts of the original documents concerning the project development. Articles published in the "Physics Teacher" are included in reprint form. Evaluation and research papers along with related materials issued in other publications are grouped into…

  1. 40 CFR 409.67 - Effluent limitations guidelines representing the degree of effluent reduction attainable by the...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS SUGAR PROCESSING POINT SOURCE CATEGORY Hilo-Hamakua Coast of the Island of Hawaii Raw Cane Sugar Processing Subcategory § 409.67 Effluent limitations guidelines...

  2. 40 CFR 409.62 - Effluent limitations guidelines representing the degree of effluent reduction attainable by the...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS SUGAR PROCESSING POINT SOURCE CATEGORY Hilo-Hamakua Coast of the Island of Hawaii Raw Cane Sugar Processing Subcategory § 409.62 Effluent limitations...

  3. 40 CFR 409.62 - Effluent limitations guidelines representing the degree of effluent reduction attainable by the...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS SUGAR PROCESSING POINT SOURCE CATEGORY Hilo-Hamakua Coast of the Island of Hawaii Raw Cane Sugar Processing Subcategory § 409.62 Effluent limitations...

  4. 40 CFR 409.62 - Effluent limitations guidelines representing the degree of effluent reduction attainable by the...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS SUGAR PROCESSING POINT SOURCE CATEGORY Hilo-Hamakua Coast of the Island of Hawaii Raw Cane Sugar Processing Subcategory § 409.62 Effluent limitations...

  5. 40 CFR 409.67 - Effluent limitations guidelines representing the degree of effluent reduction attainable by the...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS SUGAR PROCESSING POINT SOURCE CATEGORY Hilo-Hamakua Coast of the Island of Hawaii Raw Cane Sugar Processing Subcategory § 409.67 Effluent limitations guidelines...

  6. 40 CFR 409.67 - Effluent limitations guidelines representing the degree of effluent reduction attainable by the...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS SUGAR PROCESSING POINT SOURCE CATEGORY Hilo-Hamakua Coast of the Island of Hawaii Raw Cane Sugar Processing Subcategory § 409.67 Effluent limitations guidelines...

  7. DE-NE0000735 - FINAL REPORT ON THORIUM FUEL CYCLE NEUP PROJECT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krahn, Steven; Ault, Timothy; Worrall, Andrew

    The report is broken into six chapters, including this executive summary chapter. Following an introduction, this report discusses each of the project’s three major components (Fuel Cycle Data Package (FCDP) Development, Thorium Fuel Cycle Literature Analysis and Database Development, and the Thorium Fuel Cycle Technical Track and Proceedings). A final chapter is devoted to summarization. Various outcomes, publications, etc. originating from this project can be found in the Appendices at the end of the document.

  8. A Process Evaluation of Project Developmental Continuity: Final Report of the PDC Feasibility Study, 1974-1977.

    ERIC Educational Resources Information Center

    Love, John M.; And Others

    This is the final report of the 3-year feasibility phase of a projected 7-year longitudinal evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Chapter I gives an overview of the PDC program…

  9. 77 FR 40601 - Final Priority: Disability and Rehabilitation Research Projects and Centers Program; Disability...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ... analyses of data, producing observational findings, and creating other sources of research-based... provide a rationale for the stage of research being proposed and the research methods associated with the... DEPARTMENT OF EDUCATION Final Priority: Disability and Rehabilitation Research Projects and...

  10. 77 FR 5566 - Notice of Availability of the Final EIS for the HB In-Situ Solution Mine Project, Eddy County...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-03

    ...] Notice of Availability of the Final EIS for the HB In-Situ Solution Mine Project, Eddy County, New Mexico... Statement (Final EIS) for the HB In-Situ Solution Mine Project, and by this notice is announcing its... the Federal Register. ADDRESSES: Copies of the HB In-Situ Solution Mining EIS are available for public...

  11. TX-100 manufacturing final project report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashwill, Thomas D.; Berry, Derek S.

    This report details the work completed under the TX-100 blade manufacturing portion of the Carbon-Hybrid Blade Developments: Standard and Twist-Coupled Prototype project. The TX-100 blade is a 9 meter prototype blade designed with bend-twist coupling to augment the mitigation of peak loads during normal turbine operation. This structural coupling was achieved by locating off axis carbon fiber in the outboard portion of the blade skins. The report will present the tooling selection, blade production, blade instrumentation, blade shipping and adapter plate design and fabrication. The baseline blade used for this project was the ERS-100 (Revision D) wind turbine blade. Themore » molds used for the production of the TX-100 were originally built for the production of the CX-100 blade. The same high pressure and low pressure skin molds were used to manufacture the TX-100 skins. In order to compensate for the difference in skin thickness between the CX-100 and the TX-100, however, a new TX-100 shear web plug and mold were required. Both the blade assembly fixture and the root stud insertion fixture used for the CX-100 blades could be utilized for the TX-100 blades. A production run of seven TX-100 prototype blades was undertaken at TPI Composites during the month of October, 2004. Of those seven blades, four were instrumented with strain gauges before final assembly. After production at the TPI Composites facility in Rhode Island, the blades were shipped to various test sites: two blades to the National Wind Technology Center at the National Renewable Energy Laboratory in Boulder, Colorado, two blades to Sandia National Laboratory in Albuquerque, New Mexico and three blades to the United States Department of Agriculture turbine field test facility in Bushland, Texas. An adapter plate was designed to allow the TX-100 blades to be installed on existing Micon 65/13M turbines at the USDA site. The conclusion of this program is the kick-off of the TX-100 blade testing at the

  12. The Physical Fitness of Adolescents with Cerebral Palsy. Project UNIQUE II. Final Report.

    ERIC Educational Resources Information Center

    Winnick, Joseph P.; Short, Francis X.

    The final report describes a 2-year project of the State University of New York, College at Brockport, to study the physical fitness of nonretarded and retarded adolescents with cerebral palsy. The UNIQUE Physical Fitness Test was administered to 203 cerebral palsied adolescents throughout the United States and from segregated and nonsegregated…

  13. Project TIME. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Schroyer, Connie J.; Payne, David L.

    Project TIME (Training Initiative for Manufacturing Employees) was an 18-month National Workplace Literacy Program conducted by Lord Fairfax Community College in conjunction with an automotive parts plant and Triplett Technical and Business Institute in Virginia. Project TIME had three primary objectives: to help employees obtain the basic…

  14. Comprehensive Evaluation Project. Final Report.

    ERIC Educational Resources Information Center

    1969

    This project sought to develop a set of tests for the assessment of the basic literacy and occupational cognizance of pupils in those public elementary and secondary schools, including vocational schools, receiving services through Federally supported educational programs and projects. The assessment is to produce generalizable average scores for…

  15. Final PSD Permit Extension Letter - Energy Answers Arecibo, LLC/Energy Answers Arecibo Puerto Rico Renewable Energy Project, PR

    EPA Pesticide Factsheets

    This page contains the Final PSD Permit Extension Letter for Energy Answers Arecibo Puerto Rico Renewable Energy Project, issued on April 10, 2017 and the EPA Public Announcement for Final PSD Permit Extension for Energy Answers Arecibo, PR.

  16. 40 CFR 409.61 - Specialized definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... AND STANDARDS SUGAR PROCESSING POINT SOURCE CATEGORY Hilo-Hamakua Coast of the Island of Hawaii Raw Cane Sugar Processing Subcategory § 409.61 Specialized definitions. For the purpose of this subpart: (a...

  17. Parent Attitudes Toward the Virginia Beach Year-Round School Pilot Project. Final Report.

    ERIC Educational Resources Information Center

    Schlechty, Phillip C.

    Part of the Virginia Beach year-round school program evaluation, this final report contains a detailed analysis of parental attitudes, beliefs, and perceptions. The data leads to the following conclusions: a majority (53.3 percent) of parents are dubious or negative toward the 45-15 pilot project; a slight majority of parents in the pilot schools…

  18. Career Awareness Program for Bilingual Haitian and Hispanic Students (Project CAP). Final Evaluation Report, 1993-94. OER Report.

    ERIC Educational Resources Information Center

    Roman, Elliott M.

    In 1993-94 the Career Awareness Program for Bilingual Haitian and Hispanic Students (Project CAP) was in its fifth and final year as an Elementary and Secondary Education Act Title VII project. Project CAP operated at two high schools in Brooklyn (New York), serving 136 Haitians at one and an undetermined number of Spanish-speaking and Haitian…

  19. 78 FR 57066 - Final Waivers and Extensions of Project Periods; American Indian Vocational Rehabilitation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-17

    ...) Number: 84.250C and 84.250D] Final Waivers and Extensions of Project Periods; American Indian Vocational... assistance in order to provide vocational rehabilitation services to American Indians with disabilities... program is funded through a set-aside of the funds appropriated for the Vocational Rehabilitation (VR...

  20. UCSD Performance in the Edge Plasma Simulation (EPSI) Project. Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tynan, George Robert

    This report contains a final report on the activities of UC San Diego PI G.R. Tynan and his collaborators as part of the EPSI Project, that was led by Dr. C.S. Chang, from PPPL. As a part of our work, we carried out several experiments on the ALCATOR C-­MOD tokamak device, aimed at unraveling the “trigger” or cause of the spontaneous transition from low-­mode confinement (L-­mode) to high confinement (H-­mode) that is universally observed in tokamak devices, and is planned for use in ITER.

  1. Vocational Evaluation and Work Adjustment Bulletin; Vol. 8, Special Edition: Vocational Evaluation Project Final Report Part 2.

    ERIC Educational Resources Information Center

    Vocational Evaluation and Work Adjustment Association, Washington, DC.

    Part 2 of the three-part Vocational Evaluation Project final report contains brief summaries of the seven task force report which comprise the final report and two such task force reports. The report of task force 5, Standards for Vocational Evaluation, describes the task force's effort to study the standards for accreditation presently used by…

  2. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final: Comments and Responses to Comments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This document is the Comments and Responses to Comments volume of the Final Environmental Impact Statement and Environmental Impact Report prepared for the proposed Telephone Flat Geothermal Development Project (Final EIS/EIR). This volume of the Final EIS/EIR provides copies of the written comments received on the Draft EIS/EIR and the leady agency responses to those comments in conformance with the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).

  3. Expanding the Circle: South Dakota Deaf-Blind Project. Final Report, 10-1-98 through 9-30-99.

    ERIC Educational Resources Information Center

    South Dakota State Dept. of Education and Cultural Affairs, Pierre.

    This final report describes activities and accomplishments of the South Dakota Deaf-Blind Project, a 4-year federally funded project designed to raise awareness of the need for early identification of children who are deaf-blind and reside on Native American reservation lands. To this end, the states of Montana, Minnesota, North Dakota, Nebraska,…

  4. Harmony in Career Learning and Scholastic System (Project HI-CLASS). Final Evaluation Report 1992-93. OREA Report.

    ERIC Educational Resources Information Center

    Duque, Diana L.

    Harmony in Career Learning and Scholastic System (Project HI-CLASS) was a Transitional Bilingual Education Title VII-funded program in its fifth and final year in 1992-93. The project offered instructional and support services to 641 students of limited English proficiency (LEP) at three sites, all of which had many immigrant students, in…

  5. Pathways to Practice. A Series of Final Reports on the SREB Nursing Curriculum Project.

    ERIC Educational Resources Information Center

    Haase, Patricia T.

    Five final reports on the Nursing Curriculum Project of the Southern Regional Education Board are presented. The reports include (1) RN (Registered Nursing) Education: The Basic Issues; (2) Types of RN Programs; (3) Planning and Operating an RN Program; (4) Acclimating the Novice Nurse: Whose Responsibility? and (5) Statewide Planning for Nursing.…

  6. Smart Gun Technology project. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weiss, D.R.

    The goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user form firing a law officer`s firearm by implementing user-recognizing-and-authorizing (or {open_quotes}smart{close_quotes}) surety technologies. This project was funded by the National Institute of Justice. This report lists the findings and results of the project`s three primary objectives. First, to find and document the requirements for a smart firearm technology that law enforcement officers will value. Second, to investigate, evaluate, and prioritize technologies that meet the requirements for a law enforcement officer`s smart firearm. Third, to demonstrate and document the most promising technology`s usefulness inmore » models of a smart firearm.« less

  7. Final Technical Report of Project DE-FG02-96ER14647

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lundeen, Stephen R.

    This is the final technical report of work completed under DOE support over the period Sept. 1, 1996 until May 31, 2015. The title of the project was "Ion/Excited Atom Collision Studies with a Rydberg Target and a CO2 Laser" from 9/1/96 to 10/31/06, and "Properties of Actinide Ions from Measurements of Rydberg Ion Fine Structure" from 11/1/06 until 5/31/15. The primary technical results were a detailed experimental study of resonant charge transfer between Rydberg atoms and highly-charged ions, and unique measurements of many properties of multiply-charged Thorium ions.

  8. Automated metadata--final project report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schissel, David

    This report summarizes the work of the Automated Metadata, Provenance Cataloging, and Navigable Interfaces: Ensuring the Usefulness of Extreme-Scale Data Project (MPO Project) funded by the United States Department of Energy (DOE), Offices of Advanced Scientific Computing Research and Fusion Energy Sciences. Initially funded for three years starting in 2012, it was extended for 6 months with additional funding. The project was a collaboration between scientists at General Atomics, Lawrence Berkley National Laboratory (LBNL), and Massachusetts Institute of Technology (MIT). The group leveraged existing computer science technology where possible, and extended or created new capabilities where required. The MPO projectmore » was able to successfully create a suite of software tools that can be used by a scientific community to automatically document their scientific workflows. These tools were integrated into workflows for fusion energy and climate research illustrating the general applicability of the project’s toolkit. Feedback was very positive on the project’s toolkit and the value of such automatic workflow documentation to the scientific endeavor.« less

  9. Interactive Peer Coaching/Mentoring Project for Preparing Teachers of Students with Severe Behavioral Disorders Final Report. Volume 1: Project Narrative and Briefing Papers [and] Volume 2: Appendices.

    ERIC Educational Resources Information Center

    North Dakota Center for Persons with Disabilities, Minot.

    This final report discusses the activities and outcomes of the Interactive Peer Coaching/Mentoring (IPCM) Project, a program designed to prepare teachers of students with severe behavioral disorders (SED) residing in a rural, remote area in North Dakota. The IPCM project was conducted from July 1997 through July 2000 and developed an…

  10. Final Status Survey for the Largest Decommissioning Project on Earth

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dubiel, R.W.; Miller, J.; Quayle, D.

    2006-07-01

    To assist the United States Department of Energy's (US DOE's) re-industrialization efforts at its gaseous diffusion site in Oak Ridge, Tennessee, known as the East Tennessee Technology Park (ETTP), the US DOE awarded a 6-year Decontamination and Decommissioning (D and D) contract to BNG America (formerly BNFL Inc.) in 1997. The ETTP 3-Building D and D Project included the removal and disposition of the materials and equipment from the K-33, K-31, and K-29 Gaseous Diffusion Plant buildings. The three buildings comprise more than 4.8 million square feet (446,000 square meters) of floor surface area and more than 350 million poundsmore » (148 million kilograms) of hazardous and radioactively contaminated material, making it the largest nuclear D and D project in progress anywhere in the world. The logistical hurdles involved in a project of this scope and magnitude required an extensive amount of Engineering and Health Physics professionals. In order to accomplish the Final Status Survey (FSS) for a project of this scope, the speed and efficiency of automated survey equipment was essential. Surveys of floors, structural steel and ceilings up to 60 feet (18 meters) were required. The FSS had to be expanded to include additional remediation and surveys due to characterization surveys and assumptions regarding the nature and extent of contamination provided by the US DOE. Survey design and technical bases had to consider highly variable constituents; including uranium from depleted to low enrichment, variable levels of Technetium-99 and transuranic nuclides, which were introduced into the cascade during the 1960's when recycled uranium (RU) from Savannah River was re-enriched at the facility. The RU was transported to unexpected locations from leaks in the cascade by complex building ventilation patterns. The primary survey tool used for the post remediation and FSS was the Surface Contamination Monitor (SCM) and the associated Survey Information Management System

  11. Final project report for NEET pulsed ion beam project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kucheyev, S. O.

    The major goal of this project was to develop and demonstrate a novel experimental approach to access the dynamic regime of radiation damage formation in nuclear materials. In particular, the project exploited a pulsed-ion-beam method in order to gain insight into defect interaction dynamics by measuring effective defect interaction time constants and defect diffusion lengths. This project had the following four major objectives: (i) the demonstration of the pulsed ion beam method for a prototypical nuclear ceramic material, SiC; (ii) the evaluation of the robustness of the pulsed beam method from studies of defect generation rate effects; (iii) the measurementmore » of the temperature dependence of defect dynamics and thermally activated defect-interaction processes by pulsed ion beam techniques; and (iv) the demonstration of alternative characterization techniques to study defect dynamics. As we describe below, all these objectives have been met.« less

  12. Hispanic Vocational Exploration Project. Final Report.

    ERIC Educational Resources Information Center

    Centro De La Comunidad, Inc., New London, CT.

    During its second year, the Hispanic Vocational Exploration Project recruited eighth and ninth grade Hispanic youth for a four-week cycle, after-school, career exploratory program at Southeastern Regional Vocational Technical School, Groton, Connecticut. A series of career education workshops was the other major project activity. Supportive…

  13. ADD Special Projects Grant. Final Report.

    ERIC Educational Resources Information Center

    Wortham, Jocelyn F.

    The purpose of this five-year project was to prepare administrators, general and special education teachers, and parents to meet the needs of children with attention deficit hyperactivity disorders (ADHD). The project developed five self-instructional ADHD inservice preparation manuals for national and state dissemination and implemented an ADHD…

  14. Special Education Teacher Computer Literacy Training. Project STEEL. A Special Project To Develop and Implement a Computer-Based Special Teacher Education and Evaluation Laboratory. Volume II. Final Report.

    ERIC Educational Resources Information Center

    Frick, Theodore W.; And Others

    The document is part of the final report on Project STEEL (Special Teacher Education and Evaluation Laboratory) intended to extend the utilization of technology in the training of preservice special education teachers. This volume focuses on the second of four project objectives, the development of a special education teacher computer literacy…

  15. Multilevel Evaluation Systems Project. Final Report.

    ERIC Educational Resources Information Center

    Herman, Joan L.

    Several studies were conducted in 1987 by the Multilevel Evaluation Systems Project, which focuses on developing a model for a multi-purpose, multi-user evaluation system to facilitate educational decision making and evaluation. The project model emphasizes on-going integrated assessment of individuals, classes, and programs using a variety of…

  16. PROJECT PATS: "Potentially Academically Talented Students." Final Technical Report, 10/1/80-6/30/82.

    ERIC Educational Resources Information Center

    Pfeffer, J. S.; And Others

    The final report describes a 2-year pilot project to identify and program for disadvantaged potentially gifted students in grades 5-8. Two goals of the program are stated: (1) to establish a working partnership among public and nonpublic schools and higher education; and (2) to integrate disadvantaged potentially gifted with nondisadvantaged…

  17. Key outcomes and addressing remaining challenges--perspectives from a final evaluation of the China GAVI project.

    PubMed

    Yang, Weizhong; Liang, Xiaofeng; Cui, Fuqiang; Li, Li; Hadler, Stephen C; Hutin, Yvan J; Kane, Mark; Wang, Yu

    2013-12-27

    During the China GAVI project, implemented between 2002 and 2010, more than 25 million children received hepatitis B vaccine with the support of project, and the vaccine proved to be safe and effective. With careful consideration for project savings, China and GAVI continually adjusted the budget, additionally allowing the project to spend operational funds to support demonstration projects to improve timely birth dose (TBD), conduct training of EPI staff, and to monitor the project impact. Results from the final evaluation indicated the achievement of key outcomes. As a result of government co-investment, human resources at county level engaged in hepatitis B vaccination increased from 29 per county on average in 2002 to 66 in 2009. All project counties funded by the GAVI project use auto-disable syringes for hepatitis B vaccination and other vaccines. Surveyed hepatitis B vaccine coverage increased from 71% in 2002 to 93% in 2009 among infants. The HBsAg prevalence declined from 9.67% in 1992 to 0.96% in 2006 among children under 5 years of age. However, several important issues remain: (1) China still accounts for the largest annual number of perinatal HBV infections (estimated 84,121) in the WHO WPR region; (2) China still lacks a clear national policy for safe injection of vaccines; (3) vaccination of high risk adults and protection of health care workers are still not implemented; (4) hepatitis B surveillance needs to be refined to more accurately monitor acute hepatitis B; and (5) a program for treatment of persons with chronic HBV infection is needed. Recommendations for future hepatitis B control include: using the lessons learned from the China GAVI project for future introductions of new vaccines; addressing unmet needs with a second generation hepatitis B program to reach every infant, including screening mothers, and providing HBIG for infants born to HBsAg positive mothers; expanding vaccination to high risk adults; addressing remaining unsafe

  18. Project Elderly. Interim and Final Reports.

    ERIC Educational Resources Information Center

    Miami-Dade Community Coll., FL.

    This report examines Project Elderly, a project developed to provide job possibilities for the older adult in the labor market in metropolitan Miami (FL). A survey questionnaire was developed to (1) assess the opportunities of the elderly for re-entry into volunteer and paid employment positions; (2) determine the extent of the senior population…

  19. FutureGen 2.0 Pipeline and Regional Carbon Capture Storage Project - Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burger, Chris; Wortman, David; Brown, Chris

    The U.S. Department of Energy’s (DOE) FutureGen 2.0 Program involves two projects: (1) the Oxy-Combustion Power Plant Project and (2) the CO2 Pipeline and Storage Project. This Final Technical Report is focused on the CO2 Pipeline and Storage Project. The FutureGen 2.0 CO2 Pipeline and Storage Project evolved from an initial siting and project definition effort in Phase I, into the Phase II activity consisting permitting, design development, the acquisition of land rights, facility design, and licensing and regulatory approvals. Phase II also progressed into construction packaging, construction procurement, and targeted early preparatory activities in the field. The CO2 Pipelinemore » and Storage Project accomplishments were significant, and in some cases unprecedented. The engineering, permitting, legal, stakeholder, and commercial learnings substantially advance the nation’s understanding of commercial-scale CO2 storage in deep saline aquifers. Voluminous and significant information was obtained from the drilling and the testing program of the subsurface, and sophisticated modeling was performed that held up to a wide range of scrutiny. All designs progressed to the point of securing construction contracts or comfort letters attesting to successful negotiation of all contract terms and willing execution at the appropriate time all major project elements – pipeline, surface facilities, and subsurface – as well as operations. While the physical installation of the planned facilities did not proceed in part due to insufficient time to complete the project prior to the expiration of federal funding, the project met significant objectives prior to DOE’s closeout decision. Had additional time been available, there were no known, insurmountable obstacles that would have precluded successful construction and operation of the project. Due to the suspension of the project, site restoration activities were developed and the work was accomplished. The site

  20. 77 FR 30512 - Native American Career and Technical Education Program; Final Waivers and Extension of Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-23

    ... DEPARTMENT OF EDUCATION Native American Career and Technical Education Program; Final Waivers and... American Career and Technical Education Program Catalog of Federal Domestic Assistance (CFDA) Number: 84.101A. SUMMARY: For 60-month projects funded in fiscal year (FY) 2007 under the Native American Career...

  1. John Jay High School Project "RESCATE." O.E.E. Evaluation Report, 1982-1983. [Final Report.

    ERIC Educational Resources Information Center

    Friedman, Grace Ibanez; Schulman, Robert

    Project RESCATE, in its third and final year of funding, provided instruction in English as a Second Language (ESL) and native language skills, as well as bilingual instruction in science, mathematics, and social studies, to 185 Spanish-speaking students of limited English proficiency (LEP) at John Jay High School in Brooklyn, New York. In…

  2. Metropolitan Child Care Project. Final Report.

    ERIC Educational Resources Information Center

    Vartuli, Sue; Stubbs, Shirley

    A project was conducted in the metropolitan Kansas City community to assess the current state of child care needs of working parents. One project goal was to provide employers with information to help them make decisions about how much responsibility to assume for child care and which employee policies to pursue. A second goal was to assess the…

  3. Project CAREER/CAN. Final Evaluation Report.

    ERIC Educational Resources Information Center

    National Educational Evaluation Services, Inc., Chestnut Hill, MA.

    A description and evaluation of (1) the development of the 4-column process which completes the behavioral objective data base, (2) the development of the computer retrieval capability, and (3) the pilot testing of the product in high school classrooms are included in this summative evaluation of Project CAREER/CAN. (Goals of Project CAREER/CAN,…

  4. Alternative Youth Employment Strategies Project: Final Report.

    ERIC Educational Resources Information Center

    Sadd, Susan; And Others

    The Alternative Youth Employment Strategies (AYES) Project began as one of the demonstration projects funded under the Youth Employment and Demonstration Project Act in 1980. The program, which features three training models, is targeted toward high-risk, disadvantaged youth, especially minority youths from urban areas who had prior involvement…

  5. The PIE Institute Project: Final Evaluation Report

    ERIC Educational Resources Information Center

    St. John, Mark; Carroll, Becky; Helms, Jen; Smith, Anita

    2008-01-01

    The Playful Invention and Exploration (PIE) Institute project was funded in 2005 by the National Science Foundation (NSF). For the past three years, Inverness Research has served as the external evaluator for the PIE project. The authors' evaluation efforts have included extensive observation and documentation of PIE project activities; ongoing…

  6. Year 2000 Computerized Farm Project. Final Report.

    ERIC Educational Resources Information Center

    McGrann, James M.; Lippke, Lawrence A.

    An ongoing project was funded to develop and demonstrate a computerized approach to operation and management of a commercial-sized farm. Other project objectives were to facilitate the demonstration of the computerized farm to the public and to develop individual software packages and make them available to the public. Project accomplishments…

  7. How the Contents of a Bachelor's Degree Final Project of Engineering Evolve towards Innovative Scientific Knowledge: Keys to Success

    ERIC Educational Resources Information Center

    Núñez, Cristina; Guinea, Ana; Callau, Sara; Bengoa, Christophe; Basco, Josep; Gavaldà, Jordi

    2017-01-01

    The Bachelor's Degree Final Project (BDFP) of our school aims to develop a real constructive project, enhance cooperative teamwork and increase productivity of students. We present a real case study, related with engineering and scientific innovation results obtained by BDFP, which has led to an innovative scientific study presented at the 7th…

  8. Final Project Report - Revised Version

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Prasad, Manika; Carolyn, Koh

    An over-arching goal of this research is to calibrate geophysical techniques for hydrate exploration, evaluation, and production monitoring. Extensive field data of hydrate-bearing sediments exist, but quantitative estimates of the amount and distribution of hydrates are difficult to determine. Thus, the primary project objectives were to relate seismic and acoustic velocities and attenuations to hydrate saturation and texture. The project aimed to collect seismic properties along with other measurements (e.g., complex resistivity, micro-focus x-ray computed tomography, etc.). The multiphysics dataset would enable researchers to understand not only the interaction between mineral surfaces and gas hydrates, but also how the hydratemore » formation method affects the hydrate-sediment system in terms of elastic properties.« less

  9. 41. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    41. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii, T.H. VIEW FROM APPROXIMATELY THE SAME SPOT SHOWING HOW COVERING THE ROCK FILLS WITH SOIL HAS ALMOST OBLITERATED THESE SCARS. TO IDENTIFY A POINT FOR COMPARISON NOTICE THE BRIDE GULCH JUST TO THE LEFT OF THE CENTER IN THE UPPER PICTURE AND COMPARE WITH THE SAME GULCH IN THE LOWER PICTURE. THE AFTER PHOTO OF A BEFORE AND AFTER SET. BEFORE PHOTO IS HI-52-40. - Haleakala National Park Roads, Pukalani, Maui County, HI

  10. The Final Year Project (FYP) in Social Sciences: Establishment of Its Associated Competences and Evaluation Standards

    ERIC Educational Resources Information Center

    Mateo, Joan; Escofet, Anna; Martinez, Francesc; Ventura, Javier; Vlachopoulos, Dimitrios

    2012-01-01

    This paper presents the fundamental characteristics of the Final Year Project (FYP), its associated competences and some evaluation standards that derived from a research conducted by the regional government of Catalonia (Spain) and the Catalan University Quality Assurance Agency. More analytically, the paper begins with the definition of the…

  11. Choosing Optional Infused Career Education for Students in High School Bilingual Programs (Project CHOICE). Final Evaluation Report 1992-93. OREA Report.

    ERIC Educational Resources Information Center

    Cantalupo, Denise

    Project CHOICE was an Elementary and Secondary Education Act Title VII-funded project in its fifth and final year of operation at Fort Hamilton High School in Brooklyn and Springfield Gardens High School in Queens (both in New York City). In 1992-93 the project served 364 students of limited English proficiency. Participants received instruction…

  12. Two Different Approaches to Teaching Final-Year Projects for Mechanical Engineers and Biotechnologists at Ngee Ann Polytechnic--Case Studies Approach.

    ERIC Educational Resources Information Center

    Walsh, Kath; Rebaczonok-Padulo, Michael

    1993-01-01

    Ngee Ann Polytechnic, a leading postsecondary technical institution in Singapore, offers English for academic and occupational purposes to prepare students for writing their final year projects. This article discusses the approaches used in Mechanical Engineering and Biotechnology projects. A sample exercise is appended. (Contains two references.)…

  13. Cooperative Program Improvement; An Experiment in ABE In-Service Training. Doolittle Family Education Center Experimental In-Service Training Project. Final Report.

    ERIC Educational Resources Information Center

    Griffith, William S.; And Others

    This document, consisting of seven chapters and 12 appendixes, is a full final report of the Doolittle Family Education Center Experimental In-Service Training Project. Chapter II consists of the history and plan of the project including an explanation of the framework of the model that was used to conceptualize the project. Chapter III is a…

  14. Anthropometric Training Project. Final Report.

    ERIC Educational Resources Information Center

    San Diego State Coll., CA.

    The Anthropometric Training Project was aimed at providing a training program for select students to develop research competency in an area relating body type, composition, anthropometric assessment, and physical performance measures. The program involves interdisciplinary cooperation in training through seminars, laboratory practice, and…

  15. Project Head Start Research and Evaluation Center, Syracuse University Research Institute. Final Report, November 1, 1967.

    ERIC Educational Resources Information Center

    Hall, Vernon; And Others

    This document describes the research activities of the Syracuse University Evaluation and Research Center for the year September 1, 1966 through August 31, 1967. This final report is organized on the basis of six research projects, which have been abstracted under the following titles and numbers: (1) Experiments in Grammatical Processing in…

  16. Workplace Literacy Project. Final Report.

    ERIC Educational Resources Information Center

    Lopilato, Louis

    The final report on a Mercy College (New York) program of mathematics and vocational English-as-a-Second-Language (ESL) instruction for limited-English-proficient workers in a manufacturing company is presented. The report consists of documentary materials, and is organized according to the five chronological terms in which the program operated,…

  17. Access for All: Collaboration for Comprehensive Child Care for Deaf and Hearing Preschoolers and Their Families. Project Access. Final Report.

    ERIC Educational Resources Information Center

    Solit, Gail A.

    This final report presents activities and accomplishments of a three-year outreach project to link programs and agencies serving deaf and hard of hearing children and their families with child care programs in their communities. Each year project staff provided training in establishing integrated early childhood programming and child care for at…

  18. CERTS Microgrid Laboratory Test Bed - PIER Final Project Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eto, Joseph H.; Eto, Joseph H.; Lasseter, Robert

    2008-07-25

    The objective of the CERTS Microgrid Laboratory Test Bed project was to enhance the ease of integrating small energy sources into a microgrid. The project accomplished this objective by developing and demonstrating three advanced techniques, collectively referred to as the CERTS Microgrid concept, that significantly reduce the level of custom field engineering needed to operate microgrids consisting of small generating sources. The techniques comprising the CERTS Microgrid concept are: 1) a method for effecting automatic and seamless transitions between grid-connected and islanded modes of operation; 2) an approach to electrical protection within the microgrid that does not depend on highmore » fault currents; and 3) a method for microgrid control that achieves voltage and frequency stability under islanded conditions without requiring high-speed communications. The techniques were demonstrated at a full-scale test bed built near Columbus, Ohio and operated by American Electric Power. The testing fully confirmed earlier research that had been conducted initially through analytical simulations, then through laboratory emulations, and finally through factory acceptance testing of individual microgrid components. The islanding and resychronization method met all Institute of Electrical and Electronics Engineers 1547 and power quality requirements. The electrical protections system was able to distinguish between normal and faulted operation. The controls were found to be robust and under all conditions, including difficult motor starts. The results from these test are expected to lead to additional testing of enhancements to the basic techniques at the test bed to improve the business case for microgrid technologies, as well to field demonstrations involving microgrids that involve one or mroe of the CERTS Microgrid concepts.« less

  19. William H. Taft High School, Project Adelante. O.E.E. Evaluation Report, 1982-1983. [Final Report].

    ERIC Educational Resources Information Center

    Keyes, Jose Luis; Schulman, Robert

    Project Adelante, in its third and final year of funding, provided instruction in English as a Second Language (ESL) and Spanish language skills, as well as bilingual instruction in mathematics, science, and social studies, to 230 (fall semester) and 235 (spring semester) limited English proficient Hispanic students at Willaim H. Taft High School,…

  20. Project F. A. S. T.: Facilitating Academic Study Techniques for Handicapped Children. Volume 2. Final Report.

    ERIC Educational Resources Information Center

    Martin, Clessen J.

    Volume 2, the appendix to the final report of Project FAST, consists of prose selections used to study the effects of text reduction techniques on the comprehension and recall of written materials among visually handicapped and hearing impaired subjects. Each selection is presented in various versions such as 10 percent subjective deleted, 20…

  1. Montana Faxnet Project. Final Report.

    ERIC Educational Resources Information Center

    Brander, Linda L.

    This report summarizes the activities and accomplishments of the Montana Faxnet Project, which was created to design and demonstrate a statewide document delivery network utilizing telefacsimile equipment that would create equitable access for all Montanans accessing and retrieving information, and reduce the waiting time for requested materials…

  2. Study of Procedures for Determining the Least Restrictive Environment (LRE) Placement of Handicapped Children: Final Project Report.

    ERIC Educational Resources Information Center

    Thouvenelle, Suzanne; And Others

    The final document in a series on least restrictive environment (LRE) placement for handicapped students summarizes the objectives and findings of the project. Research questions, methodology, and conclusions are reviewed from each of four research activities: state education agency analysis; local education agency analysis; legal analysis; and…

  3. 40 CFR 409.61 - Specialized definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 29 2011-07-01 2009-07-01 true Specialized definitions. 409.61 Section 409.61 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS SUGAR PROCESSING POINT SOURCE CATEGORY Hilo-Hamakua Coast of the Island of Hawaii Raw Cane Sugar...

  4. 40 CFR 409.61 - Specialized definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 28 2010-07-01 2010-07-01 true Specialized definitions. 409.61 Section 409.61 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS SUGAR PROCESSING POINT SOURCE CATEGORY Hilo-Hamakua Coast of the Island of Hawaii Raw Cane Sugar...

  5. New Jersey Technical Assistance Project (N.J. TAP): "Educational Resources and Support Services on Behalf of Children with Multiple Sensory Impairment." Final Report.

    ERIC Educational Resources Information Center

    New Jersey State Dept. of Education, Trenton.

    This final report describes activities and accomplishments of the New Jersey Technical Assistance Project, a project to improve educational resources and support services for students with multiple sensory impairment (deaf-blindness). Activities and accomplishments are presented in a tabular format for each project goal and objective. The project…

  6. Project Aprendizaje. Final Evaluation Report 1992-93.

    ERIC Educational Resources Information Center

    Clark, Andrew

    This report provides evaluative information regarding the effectiveness of Project Aprendizaje, a New York City program that served 269 Spanish-speaking students of limited English proficiency (LEP). The project promoted parent and community involvement by sponsoring cultural events, such as a large Latin American festival. Students developed…

  7. Well Elderly Integrated Training Project. Final Report.

    ERIC Educational Resources Information Center

    Summit-Portage Area Health Education Network, Akron, OH.

    The Well Elderly Integrated Training Project was conceptualized as a service-oriented endeavor with an evaluation component. The project required that a university medical school resource faculty develop an integrated training program and materials on health education (wellness) for trainers who were respected, healthy elderly high in the senior…

  8. Computer Conferencing Project. Final Report.

    ERIC Educational Resources Information Center

    McNeil, Donald R.; And Others

    This report of a 3-year project discusses the results of the testing of computer conferencing and e-mail (electronic mail) at Montgomery College (Maryland) over a period of four semesters. The product was designed to answer the following questions: (1) Could computer conferencing or e-mail increase access? (2) Would the quality of the instruction…

  9. Conflict Management in Schools: Sowing Seeds for a Safer Society. Final Report of the School Conflict Management Demonstration Project 1990-1993.

    ERIC Educational Resources Information Center

    Wheeler, Terrence; And Others

    In August 1990, the Ohio Commission on Dispute Resolution and Conflict Management initiated a three-year School Conflict Management Demonstration Project. This publication is the final report on the Project. Twenty schools, which reflected the state's diversity, were selected to help assess the impact of the conflict management programs. The…

  10. Community College Technical Mathematics Project. Final Report.

    ERIC Educational Resources Information Center

    Self, Samuel L.

    The purpose of the research project was to develop an applied or technical mathematics curriculum which would meet the needs of vocational-technical students at the community college level. The research project was divided into three distinct phases: Identifying the mathematical concepts requisite for job-entry competencies in each of the…

  11. New and Emerging Occupations Project. Final Report.

    ERIC Educational Resources Information Center

    Southeast Community Coll., Lincoln, NE.

    This document reports a project to define, identify, and describe new and emerging occupations in Nebraska and disseminate that information to vocational education program and curriculum planners. Chapter 1 describes the background, problem, and purpose of the project. Chapter 2 sets forth the objectives and discusses procedures for developing a…

  12. The Oregon Applied Academics Project: Final Report

    ERIC Educational Resources Information Center

    Pearson, Donna; Richardson, George B.; Sawyer, Jennifer M.

    2013-01-01

    This report contains the findings of the Oregon Applied Academics research and development project which spanned three academic years from 2010 through 2013. The overall purpose of the project was to develop and implement a technical math course that would meet graduation requirements and improve student performance. The State of Oregon has been…

  13. Project D. E. A. F. Final Report.

    ERIC Educational Resources Information Center

    Hairston, Ernest E.

    Project D.E.A.F., its introduction and background, purpose, clientele, methodology, and activities, are described. Project D.E.A.F. was established by an expansion grant from the Rehabilitation Service Administration of the Department of Health, Education and Welfare, in cooperation with the Ohio Bureau of Vocational Rehabilitation for the purpose…

  14. Motivation for Reading Improvement. Final Project Report.

    ERIC Educational Resources Information Center

    Kit Carson Union Elementary School District, Hanford, CA.

    This document reports on a project aimed at motivating students to develop attitudes that learning can be fun and that it can benefit them, and at discouraging students from working just to please the teacher. The project involved the use of a "News Laboratory," which included a United Press International wire service, various…

  15. Draft project management update to the Iowa DOT Project Development Manual : final report.

    DOT National Transportation Integrated Search

    2016-08-01

    This work supported drafting project management guidance for the Iowa Department of Transportation (DOT). The goal is to : incorporate a greater focus on project management in their project development process. : A technical advisory committee (TAC) ...

  16. Final Environmental Assessment for Stormwater Drainage Project on F. E. Warren Air Force Base, Wyoming

    DTIC Science & Technology

    2005-05-01

    Colorado Butterfly Habitat on F. E. Warren AFB Stormwater Drainage Project, Final Environmental Assessment April 2005 F. E. Warren AFB iii Figure...A.11 Colorado Butterfly Plant Populations Near Outfall 1 Figure A.12 Preble’s Habitat on F. E. Warren AFB Figure A.13 Preble’s Captures on F. E...to threatened species habitat in the vicinity of the outfalls to Crow Creek, the base will do the following: Colorado butterfly plant: 1

  17. Georgia Vocational Student Assessment Project. Final Report.

    ERIC Educational Resources Information Center

    Vocational Technical Education Consortium of States, Atlanta, GA.

    A project was conducted to develop vocational education tests for use in Georgia secondary schools, specifically for welding, machine shop, and sheet metal courses. The project team developed an outline of an assessment model that included the following components: (1) select a program for use in developing test items; (2) verify duties, tasks,…

  18. Mercer County Community College Workplace Skills Project. Grant Period March 1, 1991-August 31, 1992. Final Evaluation.

    ERIC Educational Resources Information Center

    Mercer County Community Coll., Trenton, NJ.

    This final report of an 18-month workplace literacy project (a partnership of Mercer County Community College, a large automobile components parts manufacturer, a hospital, a physics laboratory, and a chemical plant) contains the following: (1) and introduction; (2) a performance report on nine goals of the program; (3) a schedule of…

  19. 77 FR 64543 - Notice of Availability of the Final Environmental Impact Statement for the Mount Hope Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLNVB01000 L51100000.GN0000.LVEMF12CF010 241A; NVN-082096; NVN-084632; NVN-091272; 12-08807; MO 4500039779; TAS: 14X5017] Notice of Availability of the Final Environmental Impact Statement for the Mount Hope Project, Eureka County, NV Correction...

  20. Integrated Application of Active Controls (IAAC) technology to an advanced subsonic transport project: Final ACT configuration evaluation

    NASA Technical Reports Server (NTRS)

    1982-01-01

    The Final ACT Configuration Evaluation Task of the Integrated Application of Active Controls (IAAC) technology project within the energy efficient transport program is summarized. The Final ACT Configuration, through application of Active Controls Technology (ACT) in combination with increased wing span, exhibits significant performance improvements over the conventional baseline configuration. At the design range for these configurations, 3590 km, the block fuel used is 10% less for the Final ACT Configuration, with significant reductions in fuel usage at all operational ranges. Results of this improved fuel usage and additional system and airframe costs and the complexity required to achieve it were analyzed to determine its economic effects. For a 926 km mission, the incremental return on investment is nearly 25% at 1980 fuel prices. For longer range missions or increased fuel prices, the return is greater. The technical risks encountered in the Final ACT Configuration design and the research and development effort required to reduce these risks to levels acceptable for commercial airplane design are identified.

  1. Lower Merrimack Valley Workplace Education Project. Final Report.

    ERIC Educational Resources Information Center

    Norris, Cynthia Zylkuski; Breen, Patricia K.

    A description is provided of the Lower Merrimack Valley Workplace Education Project (WEP), an educational project that offers English-as-a-Second-Language (ESL) and job-specific education classes to hourly employees in the Semiconductor Division of Alpha Industries. The challenge of the project was to create a WEP that could accommodate the…

  2. DOE-EPSCOR SPONSORED PROJECT FINAL REPORT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zhu, Jianting

    Concern over the quality of environmental management and restoration has motivated the model development for predicting water and solute transport in the vadose zone. Soil hydraulic properties are required inputs to subsurface models of water flow and contaminant transport in the vadose zone. Computer models are now routinely used in research and management to predict the movement of water and solutes into and through the vadose zone of soils. Such models can be used successfully only if reliable estimates of the soil hydraulic parameters are available. The hydraulic parameters considered in this project consist of the saturated hydraulic conductivity andmore » four parameters of the water retention curves. To quantify hydraulic parameters for heterogeneous soils is both difficult and time consuming. The overall objective of this project was to better quantify soil hydraulic parameters which are critical in predicting water flows and contaminant transport in the vadose zone through a comprehensive and quantitative study to predict heterogeneous soil hydraulic properties and the associated uncertainties. Systematic and quantitative consideration of the parametric heterogeneity and uncertainty can properly address and further reduce predictive uncertainty for contamination characterization and environmental restoration at DOE-managed sites. We conducted a comprehensive study to assess soil hydraulic parameter heterogeneity and uncertainty. We have addressed a number of important issues related to the soil hydraulic property characterizations. The main focus centered on new methods to characterize anisotropy of unsaturated hydraulic property typical of layered soil formations, uncertainty updating method, and artificial neural network base pedo-transfer functions to predict hydraulic parameters from easily available data. The work also involved upscaling of hydraulic properties applicable to large scale flow and contaminant transport modeling in the vadose zone and

  3. Southeast geysers effluent pipeline project. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dellinger, M.

    1998-01-15

    The project concept originated in 1990 with the convergence of two problems: (1) a need for augmented injection to mitigate declining reservoir productivity at the Geysers; and (2) a need for a new method of wastewater disposal for Lake County communities near the The Geysers. A public/private partnership of Geysers operators and the Lake County Sanitation District (LACOSAN) was formed in 1991 to conduct a series of engineering, environmental, and financing studies of transporting treated wastewater effluent from the communities to the southeast portion of The Geysers via a 29-mile pipeline. By 1994, these evaluations concluded that the concept wasmore » feasible and the stakeholders proceeded to formally develop the project, including pipeline and associated facilities design; preparation of an environmental impact statement; negotiation of construction and operating agreements; and assembly of $45 million in construction funding from the stakeholders, and from state and federal agencies with related program goals. The project development process culminated in the system`s dedication on October 16, 1997. As of this writing, all project components have been constructed or installed, successfully tested in compliance with design specifications, and are operating satisfactorily.« less

  4. Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glasser, Alan H.

    Final technical report on DE-SC0016106. This is the final technical report for a portion of the multi-institutional CEMM project. This report is centered around 3 publications and a seminar presentation, which have been submitted to E-Link.

  5. Experience-Based Career Education. High School Level Demonstration Project. Final Report (October 1, 1976 to July 30, 1979).

    ERIC Educational Resources Information Center

    Greenville County School District, Greenville, SC.

    An Experience-Based Career Education (EBCE) exemplary project was conducted for three years in four high schools in Greenville County, South Carolina, and then evaluated for this final program report. Guidance and community components made up the program's major strengths. A third component (academic) proved nonessential. The guidance component…

  6. 42 CFR 137.333 - What procedures must the Secretary follow if the Secretary rejects a final construction project...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false What procedures must the Secretary follow if the... What procedures must the Secretary follow if the Secretary rejects a final construction project... controlling legal authority supporting the rejection; (b) Within 20 days, provide all documents relied on in...

  7. W.A. Parish Post Combustion CO 2 Capture and Sequestration Project Final Public Design Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Armpriester, Anthony

    The Petra Nova Project is a commercial scale post-combustion carbon dioxide capture project that is being developed by a joint venture between NRG Energy (NRG) and JX Nippon Oil and Gas Exploration (JX). The project is designed to separate and capture carbon dioxide from an existing coal-fired unit's flue gas slipstream at NRG's W.A. Parish Generation Station located southwest of Houston, Texas. The captured carbon dioxide will be transported by pipeline and injected into the West Ranch oil field to boost oil production. The project, which is partially funded by financial assistance from the U.S. Department of Energy will usemore » Mitsubishi Heavy Industries of America, Inc.'s Kansai Mitsubishi Carbon Dioxide Recovery (KM-CDR(R)) advanced amine-based carbon dioxide absorption technology to treat and capture at least 90% of the carbon dioxide from a 240 megawatt equivalent flue gas slipstream off of Unit 8 at W.A. Parish. The project will capture approximately 5,000 tons of carbon dioxide per day or 1.5 million tons per year that Unit 8 would otherwise emit, representing the largest commercial scale deployment of post-combustion carbon dioxide capture at a coal power plant to date. The joint venture issued full notice to proceed in July 2014 and when complete, the project is expected to be the world's largest post-combustion carbon dioxide capture facility on an existing coal plant. The detailed engineering is sufficiently complete to prepare and issue the Final Public Design Report.« less

  8. 76 FR 65746 - Notice of Availability of Joint Final Environmental Impact Statement/Final Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-24

    ... Boulevard. The project will consist of up to 128 wind turbines (1.5 to 3.0 MW each) with a generating... Statement/Final Environmental Impact Report for the Tule Wind Project, California, and Notice of Intent To... Final Environmental Impact Report (EIR) as a joint environmental analysis document for Tule Wind, LLC's...

  9. Assisting Newcomers through Employment and Support Services: An Evaluation of the New Americans Centers Demonstration Project in Arkansas and Iowa. Final Report

    ERIC Educational Resources Information Center

    Koralek, Robin; Johnson, Heidi; Ratcliffe, Caroline; Vericker, Tracy

    2010-01-01

    This report presents the final results for the evaluation of the New Americans Centers (NACs) demonstration project in Arkansas and Iowa. It focuses on program operations and plans for program sustainability, while highlighting services provided through the demonstration projects in Arkansas and Iowa. It also documents outcomes for New Iowan…

  10. DE-EE0006714 Final Report-Project Icebreaker™

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wagner, Lorry; Karpinski, David; Nagusky, Beth

    Project Icebreaker, a 20 Megawatt offshore wind project 8 miles north of Cleveland, OH in Lake Erie, has been under development by the Lake Erie Energy Development Corporation since 2009. Significant development efforts were completed prior to the award of DE-EE0006714 (December 2014). This report describes the status of the work performed under award DE-EE0006714. The work was organized into several categories or tasks. The report presents the status of that work in each of eleven (11) main tasks: 1) State and Federal Permits; 2) Mono Bucket Foundation Engineering; 3) Construction and Installation Engineering; 4) Cable Route Survey; 5) Electricalmore » System Design; 6) Power Off-take; 7) Project Costs and Risk Management; 8) Operations and Maintenance Planning; 9) Domestic Supply Chain Development; 10) Instrumentation Planning; and 11) Department of Energy Review.« less

  11. MITSI project : final local evaluation report

    DOT National Transportation Integrated Search

    2003-01-01

    The mission statement for the MITSI project was facilitating National Standards Compliance migration for NaviGAtor, conducting National Architecture mapping for MARTA and E911, and evaluating CORBA as a methodology for exchanging data. This involved ...

  12. Developing and Evaluating Interventions Aimed at Increasing Retention of Special Education Teachers (Teacher Support & Retention Project). Final Report.

    ERIC Educational Resources Information Center

    Cooley, Elizabeth

    This final report describes the activities and outcomes of a 3-year federally funded project that developed and evaluated interventions aimed at increasing retention of special education teachers. The interventions developed and evaluated consisted of: (1) a series of stress management workshops aimed at preventing or alleviating teacher burnout,…

  13. X-43A Final Flight Observations

    NASA Technical Reports Server (NTRS)

    Grindle, Laurie

    2011-01-01

    The presentation will provide an overview of the final flight of the NASA X-43A project. The project consisted of three flights, two planned for Mach 7 and one for Mach 10. The first flight, conducted on June 2, 2001, was unsuccessful and resulted in a nine-month mishap investigation. A two-year return to flight effort ensued and concluded when the second Mach 7 flight was successfully conducted on March 27, 2004. The third and final flight, which occurred on November 16, 2004, was the first Mach 10 flight demonstration of an airframe-integrated, scramjet-powered, hypersonic vehicle. As such, the final flight presented first time technical challenges in addition to final flight project closeout concerns. The goals and objectives for the third flight as well as those for the project will be presented. The configuration of the Hyper-X stack including the X-43A, Hyper-X launch vehicle, and Hyper-X research vehicle adapter wil also be presented. Mission differences, vehicle modifications and lessons learned from the first and second flights as they applied to the third flight will also be discussed. Although X-43A flight 3 was always planned to be the final flight of the X-43A project, the X-43 program had two other vehicles and corresponding flight phases in X-43C and X-43B. Those other projects never manifested under the X-43 banner and X-43A flight 3 also became the final flight of X-43 program.

  14. Enhanced digital mapping project : final report

    DOT National Transportation Integrated Search

    2004-11-19

    The Enhanced Digital Map Project (EDMap) was a three-year effort launched in April 2001 to develop a range of digital map database enhancements that enable or improve the performance of driver assistance systems currently under development or conside...

  15. Project Familia. Final Evaluation Report, 1993-94. OER Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Educational Research.

    Project Familia was an Elementary and Secondary Education Act Title VII project in its second year in 1993-94 in New York City. Project Familia served 77 children at 3 schools who were identified as limited English proficient, special education students in prekindergarten through fifth grade and their parents. The project provided after-school…

  16. Final Report for NMBSA Project, Monika Kaden, 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ward, William Carl

    The following pages define the objectives and results for Project 022, requested by Monika Kaden, a sculptor who maintains studios in Santa Fe. This effort was first approved in February 2016, and was completed during several different time segments spread over the year, depending on Monika’s availability. The project deliverables that are of primary use to the customer are digital data files that are to be delivered electronically. This report is a summary overview of how the project was conducted.

  17. WindFloat Pacific Project, Final Scientific and Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Banister, Kevin

    2017-01-17

    PPI’s WindFloat Pacific project (WFP) was an up to 30 MW floating offshore wind demonstration project proposed off the Coast of Oregon. The project was to be sited approximately 18 miles due west of Coos Bay, in over 1000 ft. of water, and is the first floating offshore wind array proposed in the United States, and the first offshore wind project of any kind proposed off the West Coast. PPI’s WindFloat, a semi-submersible foundation designed for high-capacity (6MW+) offshore wind turbines, is at the heart of the proposed project, and enables access to the world class wind resource at themore » project site and, equally, to other deep water, high wind resource areas around the country.« less

  18. Klickitat Cogeneration Project : Final Environmental Assessment.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Klickitat Energy Partners

    1994-09-01

    To meet BPA`s contractual obligation to supply electrical power to its customers, BPA proposes to acquire power generated by Klickitat Cogeneration Project. BPA has prepared an environmental assessment evaluating the proposed project. Based on the EA analysis, BPA`s proposed action is not a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 for the following reasons: (1)it will not have a significant impact land use, upland vegetation, wetlands, water quality, geology, soils, public health and safety, visual quality, historical and cultural resources, recreation and socioeconomics, and (2)more » impacts to fisheries, wildlife resources, air quality, and noise will be temporary, minor, or sufficiently offset by mitigation. Therefore, the preparation of an environmental impact statement is not required and BPA is issuing this FONSI (Finding of No Significant Impact).« less

  19. Final report of the decontamination and decommission of Building 31 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krabacher, J.E.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the domestic uranium procurement program funded by the U.S. Atomic Energy Commission. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial actionmore » contractor. Radiological contamination was identified in Building 31 and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This area was addressed in the summary final report of the remediation of the exterior areas of the GJPO facility. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  20. The Dust Management Project: Final Report

    NASA Technical Reports Server (NTRS)

    Hyatt, Mark J.; Straka, Sharon

    2011-01-01

    A return to the Moon to extend human presence, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth s economic sphere, will require investment in developing new technologies and capabilities to achieve affordable and sustainable human exploration. From the operational experience gained and lessons learned during the Apollo missions, conducting longterm operations in the lunar environment will be a particular challenge, given the difficulties presented by the unique physical properties and other characteristics of lunar regolith, including dust. The Apollo missions and other lunar explorations have identified significant lunar dust-related problems that will challenge future mission success. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems and human explorers. The Dust Management Project (DMP) is tasked with the evaluation of lunar dust effects, assessment of the resulting risks, and development of mitigation and management strategies and technologies related to Exploration Systems architectures. To this end, the DMP supports the overall goal of the Exploration Technology Development Program (ETDP) of addressing the relevant high priority technology needs of multiple elements within the Constellation Program (CxP) and sister ETDP projects. Project scope, approach, accomplishments, summary of deliverables, and lessons learned are presented.

  1. Professional Development Capacity Building in Pennsylvania's Regional Staff Development Program: The "WorkNet" Project. Final Report [and] WorkNet Workplace Literacy Trainer's Guide.

    ERIC Educational Resources Information Center

    Carman, Priscilla S.

    These two documents are products of a project to improve the capability of the Pennsylvania Regional Staff Development Centers to provide current, research-based workplace literacy training and technical assistance to adult basic and literacy education programs. The final report describes these project activities: development of training materials…

  2. Evaluation of recycled projects for performance : final report.

    DOT National Transportation Integrated Search

    1995-04-01

    Louisiana constructed two hot mix recycling projects in 1978 in order to determine the feasibility of this technology with respect to design and construction. In 1980-81 four recycled projects were constructed to examine the variations found in recyc...

  3. Bulk transmission system component outage data base. Research project 1283-1. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Albrecht, P.F.; Heising, C.R.; Patton, A.D.

    1981-04-01

    This project is responsive to the premise that the successful analysis of equipment reliability and system adequacy in bulk transmission system planning and system operations requires data on equipment failure rates, maintenance outage rates and repair times. The objective of the project is to develop a system of consistent definitions, formats and procedures which can be used in the collection of such data in a well designed outage data bank. The project consisted of four interrelated phases, beginning with a review of related work and problem definition and ending with a discussion of data base organization and management. The reviewmore » of related work quickly pointed out that two schools of thought exist on data collection. One group contends that data should be collected on bulk transmission system physical equipments, such as transformers, circuit breakers, etc., and the other group supports data collection on functional transmission lines, including the terminal equipment, which have been defined as transmission units in this report. A compromise between these two approaches was imperative for successful completion of the work. The second phase investigated the data needed for reliability evaluation. The applications of the data bank were enumerated leading to a list of basic data needed when recording an incident. Phase 3 concentrated on developing procedures for data collection using forms to collect data both on outages and on the equipment design. Finally, the aspects of data base organization and management were explored and general recommendations made appropriate to this specific application. The project did not succeed in completely defining the procedures, particularly for multiple outages, but the ground work has been laid for a pilot data collection effort to refine the procedures before wide scale implementation by the utility industry.« less

  4. Solar Energy Information and Education Project. Final Report.

    ERIC Educational Resources Information Center

    Hensley, Michael

    The New Mexico Solar Energy Institute (NMSEI) conducted a concentrated information and education program during 1985. This report summarizes NMSEI's Information and Education project activities. It provides detailed descriptions of project costs and concise recommendations for similar programs. Individual sections contain explanations of the scope…

  5. Technology Education Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    Appalachian Technology Education Consortium, Morgantown, WV.

    Year 1 of the Appalachian Technology Education Consortium Demonstration Project began with formation of an executive committee to serve as the managerial arm and establishment of a board of directors to determine policy direction. Other activities included planning for external evaluation, recruiting of demonstration and observer schools, and…

  6. Multiple Learning Strategies Project. Final Report.

    ERIC Educational Resources Information Center

    Danford, Jan

    This project researched and defined learning profiles for educable mentally impaired, visually impaired, low-reading, and regular vocational students based on the communication skills, attitudes toward self and others, knowledge level, and the cultural and social factors for each group. Through analysis of these profiles, and a consideration of…

  7. Industry Panel Curriculum Project. Final Report.

    ERIC Educational Resources Information Center

    Kenneke, Larry J.

    This project was conducted to develop and disseminate updated curriculum guides for nine selected cluster areas of vocational education programs in Oregon; only five were developed. The updates were based on recommendations made by industry review panels (IRPs). Specialists from the Oregon Department of Education and Oregon State University…

  8. Project Sell, Title VII: Final Evaluation 1970-1971.

    ERIC Educational Resources Information Center

    Condon, Elaine C.; And Others

    This evaluative report consists of two parts. The first is a narrative report which represents a summary by the evaluation team and recommendations regarding project activities; the second part provides a statistical analysis of project achievements. Details are provided on evaluation techniques, staff, management, instructional materials,…

  9. Legacy sample disposition project. Volume 2: Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gurley, R.N.; Shifty, K.L.

    1998-02-01

    This report describes the legacy sample disposition project at the Idaho Engineering and Environmental Laboratory (INEEL), which assessed Site-wide facilities/areas to locate legacy samples and owner organizations and then characterized and dispositioned these samples. This project resulted from an Idaho Department of Environmental Quality inspection of selected areas of the INEEL in January 1996, which identified some samples at the Test Reactor Area and Idaho Chemical Processing Plant that had not been characterized and dispositioned according to Resource Conservation and Recovery Act (RCRA) requirements. The objective of the project was to manage legacy samples in accordance with all applicable environmentalmore » and safety requirements. A systems engineering approach was used throughout the project, which included collecting the legacy sample information and developing a system for amending and retrieving the information. All legacy samples were dispositioned by the end of 1997. Closure of the legacy sample issue was achieved through these actions.« less

  10. US Department of Energy Grand Junction Projects Office Remedial Action Project, final report of the decontamination and decommissioning of Building 36 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 36more » was found to be radiologically contaminated and was demolished in 1996. The soil beneath the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  11. Integrated Application of Active Controls (IAAC) technology to an advanced subsonic transport project: Wing planform study and final configuration selection

    NASA Technical Reports Server (NTRS)

    1981-01-01

    The Wing Planform Study and Final Configuration Selection Task of the Integrated Application of Active Controls (IAAC) Technology Project within the Energy Efficient Transport Program is documented. Application of Active Controls Technology (ACT) in combination with increased wing span resulted in significant improvements over the Conventional Baseline Configuration (Baseline) and the Initial ACT Configuration previously established. The configurations use the same levels of technology, takeoff gross weight, and payload as the Baseline. The Final ACT Configuration (Model 768-107) incorporates pitch-augmented stability (which enabled an approximately 10% aft shift in cruise center of gravity and a 44% reduction in horizontal tail size), lateral/directional-augmented stability, an angle-of-attack limiter, and wing-load alleviation. Flutter-mode control was not beneficial for this configuration. This resulted in an 890 kg (1960 lb) reduction in airplane takeoff gross weight and a 9.8% improvement in cruise lift/drag. At the Baseline mission range (3589 km 1938 nmi), this amounts to 10% block-fuel reduction. Results of this task strongly indicate that the IAAC Project should proceed with the Final ACT evaluation, and begin the required control system development and test.

  12. American History Laboratory Project. Final Report.

    ERIC Educational Resources Information Center

    Taylor, William R.

    The results of an experimental project in American history which introduced to students the methods of historical investigation in specific historical areas through small group research rather than through the college survey course are described in this report. Discussed are (1) the course organization, consisting of two semester units in which…

  13. Maine Project against Bullying. Final Report.

    ERIC Educational Resources Information Center

    Saufler, Chuck; Gagne, Cyndi

    Noting that bullying among primary school-age children has become recognized as an antecedent to more violent behavior in later grades, the 3-year Maine Project Against Bullying examined currently available research on bullying and evaluated books, curricula, media materials, and programs to identify resources and strategies which can be applied…

  14. School-to-Work Project. Final Report.

    ERIC Educational Resources Information Center

    National Advisory Council on Vocational Education, Washington, DC.

    The document reviews the School-to-Work Project, which has been concerned with improving and developing the school component of the job placement process. Research, design, development, and dissemination phases and results are traced from 1972-1976 through the following stages: (1) Research, 1972-74, involving a literature search to identify…

  15. Project Developmental Continuity Evaluation: Final Report. Executive Summary.

    ERIC Educational Resources Information Center

    Bond, James T.; Rosario, Jose

    This executive summary presents the major results of the longitudinal evaluation of Project Developmental Continuity (PDC). A Head Start demonstration project initiated by the Administration for Children, Youth and Families (ACYF) in 1974, the PDC aimed to stimulate the development and implementation of comprehensive programs linking Head Start…

  16. Alpena Community College Workplace Partnership Project. Final Report.

    ERIC Educational Resources Information Center

    Alpena Community Coll., MI.

    This document consists of materials produced during the Workplace Partnership Project (WPP), a National Workplace Literacy Program-funded workplace literacy partnership between Alpena Community College (ACC) in Alpena, Michigan, and area businesses. Presented first is a personal reflection in which the project director shares some of the lessons…

  17. Multiple Intelligences: Curriculum and Assessment Project. Final Report

    ERIC Educational Resources Information Center

    Hyland, Aine, Ed.

    2011-01-01

    The "Multiple Intelligences, Curriculum and Assessment Project" at University College Cork was a collaborative project carried out between 1995 and 1999. The key research question focused on whether Howard Gardner's theory of Multiple Intelligences could be applied to, and enhance, aspects of curriculum and assessment at primary and…

  18. Metropolitan Planning Project, 1977-78. Final Performance Report.

    ERIC Educational Resources Information Center

    Arnoff, Steven M.

    This document provides a description of the Metropolitan Planning Project (MPP), its objectives, strategies, and an evaluation of its implementation in the Boston area. In order to encourage the voluntary elimination, reduction, and prevention of minority group isolation in elementary and secondary schools in Boston, the project focuses on two…

  19. Computer Lessons for Written Harmony. Final Project Report.

    ERIC Educational Resources Information Center

    Arenson, Michael A.

    This project was created to help music students in their development of part-writing and harmonization skills, requirements for college-level music study. It was developed and programmed by members of the Instructional Technology Center and Department of Music at the University of Delaware. The software developed during this project provides…

  20. Research Applications for Teaching (RAFT) Project. Final Report.

    ERIC Educational Resources Information Center

    Thomson, James R., Jr.; Handley, Herbert M.

    A report is given of the development and progress of the Research Applications for Teaching (RAFT) project, developed at Mississippi State University. Based upon research findings relative to effective teaching and effective schooling, five curriculum modules were prepared and implemented in instruction. In the second year of the project the…

  1. Missouri Soybean Association Biodiesel Demonstration Project: Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ludwig, Dale; Hamilton, Jill

    The Missouri Soybean Association (MSA) and the National Biodiesel Board (NBB) partnered together to implement the MSA Biodiesel Demonstration project under a United States Department of Energy (DOE) grant. The goal of this project was to provide decision makers and fleet managers with information that could lead to the increased use of domestically produced renewable fuels and could reduce the harmful impacts of school bus diesel exhaust on children. This project was initiated in September 2004 and completed in April 2011. The project carried out a broad range of activities organized under four areas: 1. Petroleum and related industry educationmore » program for fuel suppliers; 2. Fleet evaluation program using B20 with a Missouri school district; 3. Outreach and awareness campaign for school district fleet managers; and 4. Support of ongoing B20 Fleet Evaluation Team (FET) data collection efforts with existing school districts. Technical support to the biodiesel industry was also provided through NBB’s Troubleshooting Hotline. The hotline program was established in 2008 to troubleshoot fuel quality issues and help facilitate smooth implementation of the RFS and is described in greater detail under Milestone A.1 - Promote Instruction and Guidance on Best Practices. As a result of this project’s efforts, MSA and NBB were able to successfully reach out to and support a broad spectrum of biodiesel users in Missouri and New England. The MSA Biodiesel Demonstration was funded through a FY2004 Renewable Energy Resources Congressional earmark. The initial focus of this project was to test and evaluate biodiesel blends coupled with diesel oxidation catalysts as an emissions reduction technology for school bus fleets in the United States. The project was designed to verify emissions reductions using Environmental Protection Agency (EPA) protocols, then document – with school bus fleet experience – the viability of utilizing B20 blends. The fleet experience was

  2. Tech Prep II: Implementation Final Report.

    ERIC Educational Resources Information Center

    Brown, Jane A.

    This document contains the final progress report on a tech prep implementation project and the Work Force Challenge 2000 Report developed during the project. The final report lists these major accomplishments: approximately 1,500 educators in grades K-12 were provided information concerning future global issues in the work force and the effects in…

  3. Inactive Health Personnel Project: Final Report.

    ERIC Educational Resources Information Center

    Schiavone, Geraldine R. S.

    The Inactive Health Personnel Project, conducted by the New Jersey Department of Health in 1967, had as objectives to increase the supply of health manpower by locating health personnel and promoting their active employment; to develop the details of health personnel needs by category of personnel and geographic area; and to assist in the return…

  4. Biorefinery Demonstration Project Final Progress Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, David

    2015-10-20

    In this project we focused on various aspects of biorefinery technology development including algal-biorefinery technology, thermochemical conversion of biomass to bio-oils and biochar; we tested characteristics and applications of biochars and evaluated nutrient cycling with wastewater treatment by the coupling of algal culture systems and anaerobic digestion. Key results include a method for reducing water content of bio-oil through atomized alcohol addition. The effect included increasing the pH and reducing the viscosity and cloud point of the bio-oil. Low input biochar production systems were evaluated via literature reviews and direct experimental work. Additionally, emissions were evaluated and three biochar systemsmore » were compared via a life cycle analysis. Attached growth systems for both algal cultivation and algal harvesting were found to be superior to suspended growth cultures. Nutrient requirements for algal cultivation could be obtained by the recycling of anaerobic digester effluents, thus experimentally showing that these two systems could be directly coupled. Twenty-two journal articles and six intellectual property applications resulted from the cumulative work that this project contributed to programmatically.« less

  5. Wind energy education projects. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ziegler, P.; Conlon, T.R.; Arcadi, T.

    Two projects under DOE's Small-Scale Appropriate Energy Technology Grants Program have educated the public in a hands on way about wind energy systems. The first was awarded to Peter Ziegler of Berkeley, California, to design and build a walk-through exhibition structure powered by an adjoining wind-generator. This Wind Energy Pavilion was erected at Fort Funston in the Golden Gate National Recreation Area. It currently serves both as an enclosure for batteries and a variety of monitoring instruments, and as a graphic environment where the public can learn about wind energy. The second project, entitled Wind and Kid Power, involved anmore » educational program for a classroom of first through third grades in the Vallejo, Unified School District. The students studied weather, measured wind speeds and built small models of wind machines. They also built a weather station, and learned to use weather instruments. The grant funds enabled them to actually build and erect a Savonius wind machine at the Loma Vista Farm School.« less

  6. Final Evaluation Report for Minneapolis Health and Nutrition Project.

    ERIC Educational Resources Information Center

    Guardian Resource Development, Inc., St. Paul, Minn.

    The social, mental and physical health of children in target Minneapolis Schools has been carefully studied. The intent of this project was to design and implement a program which would improve health. This report discusses the progress of the project for the first year. The project's activities centered around planning, needs assessment and…

  7. Texas Labor Mobility, Experimental and Demonstration Project. Final Report.

    ERIC Educational Resources Information Center

    Texas Employment Commission, Austin.

    The Texas Labor Mobility Project's purpose was to demonstrate the effectiveness of using financial assistance to create stability in migrant workers and to reduce unemployment. The program was designed as a research project to gather information about all phases of the Mobility Project. This was handled through the Texas Employment Commission. In…

  8. The Workplace Literacy System Project (WLS). Final Performance Report.

    ERIC Educational Resources Information Center

    Poulton, Bruce R.

    The Workplace Literacy System Project (WLS) prepared interactive CD-ROM discs containing about 50 hours of instruction and drill in basic skills presented within the context of the textile/apparel manufacturing industry. The project was conducted at a Sara Lee knit products plant in North Carolina. During the project, literacy task analyses were…

  9. A School-Community Career Education Project. Final Report.

    ERIC Educational Resources Information Center

    Opelika City Schools, AL.

    The 3-year Opelika City (Alabama) School-Community Career Education Project sought to make career education central and not just an adjunct to the education program in Opelika schools. Development of the project was carried out through four phases: (1) Staff training and development, (2) curriculum development and revisions, (3) guidance, and (4)…

  10. Project Aprendizaje. 1990-91 Final Evaluation Profile. OREA Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Office of Research, Evaluation, and Assessment.

    An evaluation was done of New York City Public Schools' Project Aprendizaje, which served disadvantaged, immigrant, Spanish-speaking high school students at Seward Park High School in Manhattan. The Project enrolled 290 students in grades 9 through 12, 93.1 percent of whom were eligible for the Free Lunch Program. The Project provided students of…

  11. Topical Modules in Secondary Mathematics. Final Project Report.

    ERIC Educational Resources Information Center

    Fresno City Unified School District, CA.

    Summative evaluation of an ESEA Title III project designed to raise the mathematics achievement scores of low achievers in grades 10 and 11 is reported. In a summer writing project, teachers developed 21 arithmetic modules and 11 algebra modules for use by students on an individual basis. Students used the modules at their own pace and stayed with…

  12. Project Tune-Up: A New Look at Project Prepare. Final Report. 1994-1995.

    ERIC Educational Resources Information Center

    Central Intermediate Unit 10, Pleasant Gap, PA.

    This document includes a report on Project Tune-Up, which was conducted to update Project Prepare, a program to help Pennsylvania adult learners prepare for business school entrance examinations, the PSB [Pennsylvania State Board]-Aptitude for Practical Nursing examination, and college placement examinations. The report describes how the Project…

  13. Students' Perceptions of Communications Provided by Faculty and Peer Leaders, Course Motivation, and Final Project Innovativeness in Capstone Courses

    ERIC Educational Resources Information Center

    Evert, Amanda Faith

    2011-01-01

    Scope and Method of Study. The purpose of this study was to assess students' perceptions of communications provided by faculty and peer leaders in relationship to both students' perceptions of their course motivation as well as their perceptions of the innovativeness of their final project in single and multidisciplinary capstone courses. The…

  14. Integrated Application of Active Controls (IAAC) technology to an advanced subsonic transport project: Wing planform study and final configuration selection

    NASA Technical Reports Server (NTRS)

    1981-01-01

    This report summarizes the Wing Planform Study Task and Final Configuration Selection of the Integrated Application of Active Controls (IAAC) Technology Project within the Energy Efficient Transport Program. Application of Active Controls Technology (ACT) in combination with increased wing span resulted in significant improvements over the Conventional Baseline Configuration (Baseline) and the Initial ACT Configuration previously established. The configurations use the same levels of technology (except for ACT), takeoff gross weight, and payload as the Baseline. The Final ACT Configuration (Model 768-107) incorporates pitch-augmented stability (which enabled an approximately 10% aft shift in cruise center of gravity and a 45% reduction in horizontal tail sizes), lateral/directional-augmented stability, an angle-of-attack limiter, and wing-load alleviation. Flutter-mode control was not beneficial for this configuration. This resulted in an 890 kg (1960 lb) reduction in airplane takeoff gross weight and a 9.8% improvement in cruise lift/drag. At the Baseline mission range (3590 km) (1938 nmi), this amounts to 10% block fuel reduction. Good takeoff performance at high-altitude airports on a hot day was also achieved. Results of this task strongly indicate that the IAAC Project should proceed with the Final ACT evaluation and begin the required control system development and testing.

  15. Jobs and Self-Sufficiency: Goals of the Project, "Technical Support Services to the Developmentally Disabled, Region III." Final Report, October 1976 to September 1979.

    ERIC Educational Resources Information Center

    Mallik, Kalisankar; Shaver, Elaine M.

    The final report of a 3 year project to improve the quality of life of mentally retarded, cerebral palsied, and epileptic persons in Region III is presented. The first section details the efforts of the project staff in providing competitive employment opportunities or sheltered employment for 40 severely disabled persons. Equipment modification…

  16. Final Report - Navajo Electrification Demonstration Project - FY2004

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kenneth L. Craig, Interim General Manager

    2007-03-31

    The Navajo Electrification Demonstration Project (NEDP) is a multi-year projects which addresses the needs of unserved Navajo Nation residents without basic electricity services. The Navajo Nation is the United States' largest tribe, in terms of population and land. An estimated 18,000 Navajo Nation homes do not have basic grid-tied electricity--and this third year of funding, known as NEDP-3, provided 351 power line extensions to Navajo families.

  17. Quantitative Aspects about the Interactions of Professors in the Learning Management System during a Final Undergraduate Project Distance Discipline

    ERIC Educational Resources Information Center

    Cechinel, Cristian

    2014-01-01

    This work presents a quantitative study of the use of a Learning Management System (LMS) by the professors of a distance learning course, focused on the guidance given for the students' Final Undergraduate Project. Data taken from the logs of 34 professors in two distinct virtual rooms were collected. After pre-processing the data, a series of…

  18. US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krabacher, J.E.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52more » was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  19. Beach Point Test Site, Aberdeen Proving Ground, Edgewood Area, Maryland. Focused Feasibility Study, Final Project Work Plan

    DTIC Science & Technology

    1993-10-01

    Disposal Act (SWDA)/Resource Conservation and Recovery Act (RCRA). Jacobs Englnwfng Gmo Inc FINAL PROJECT WORK PLAN Washington Operatvo 8~ Fs 2-551I Date...shaded map of contaminated areas defined by chemical data, more than one map may be consructed f special and grapk cons *tft ame encountered. Results...that a Siophysical c ao p Pro rma down the axis or Beah PointS using geophysic teehnozoglosts that are •vi subsurface hyd&rosAdgraphic cmal beneath

  20. The Midlands Consortium Star Schools Project: Final Report, Final Evaluation Report, Final Evaluation Report Appendices.

    ERIC Educational Resources Information Center

    Midlands Consortium.

    The reports presented in this document describe the results of the first 2 years of the Midlands Consortium Star Schools Project (MCSSP) (October 1, 1988-December 31, 1990). The first report summarizes the major accomplishments of the MCSSP, including: (1) the installation of communications satellites at schools in Alabama, Kansas, Mississippi,…

  1. Quantification for complex assessment: uncertainty estimation in final year project thesis assessment

    NASA Astrophysics Data System (ADS)

    Kim, Ho Sung

    2013-12-01

    A quantitative method for estimating an expected uncertainty (reliability and validity) in assessment results arising from the relativity between four variables, viz examiner's expertise, examinee's expertise achieved, assessment task difficulty and examinee's performance, was developed for the complex assessment applicable to final year project thesis assessment including peer assessment. A guide map can be generated by the method for finding expected uncertainties prior to the assessment implementation with a given set of variables. It employs a scale for visualisation of expertise levels, derivation of which is based on quantified clarities of mental images for levels of the examiner's expertise and the examinee's expertise achieved. To identify the relevant expertise areas that depend on the complexity in assessment format, a graphical continuum model was developed. The continuum model consists of assessment task, assessment standards and criterion for the transition towards the complex assessment owing to the relativity between implicitness and explicitness and is capable of identifying areas of expertise required for scale development.

  2. Final report of the decontamination and decommissioning of Building 44 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial actionmore » contractor. Building 44 was radiologically contaminated and the building was demolished in 1994. The soil area within the footprint of the building was not contaminated; it complies with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  3. Thai-Alberta Co-Operative Assessment Project Concerning Thirty-Two Rural Secondary Schools in the Third National Economic and Social Plan, Thailand (1972-1976). Final Report.

    ERIC Educational Resources Information Center

    Chareonchai, Ruang; And Others

    This extensive assessment project report focuses on the Rural Secondary Schools (RSS) Project in Thailand. The background, design, rationale and objectives of the assessment are described, as are the eight phases of the study: reconnaissance; proposals; basic planning and pre-testing; data collection; analysis; academic review; final report; and…

  4. KEY COMPARISON: Final report of EUROMET Project 696: pH determination of a phthalate buffer

    NASA Astrophysics Data System (ADS)

    Spitzer, Petra; Charlet, Philippe; Eberhard, Ralf; Karpov, Oleg V.; Philippe, Rachel; Rivier, Cedric; Maximov, Igor; Sudmeier, Uwe

    2005-01-01

    The EUROMET project 696, a trilateral comparison between PTB, Germany, LNE, France and VNIIFTRI, Russia was performed in order to demonstrate and document the capability of the participants to measure the pH of a phthalate buffer by the primary measurement procedure for pH. Good agreement of the reported results was observed. The sample was very similar to the one used in the comparison CCQM-K17. PTB acts as pilot laboratory in CCQM-K17 and in EUROMET 696. This comparison allows one to link the results obtained by LNE to the CCQM-K17 key comparison through the degree of equivalence of PTB. On the other hand, the discrepancy between measured pH values at the VNIIFTRI and PTB for the same type of buffer solution decreased, as compared with a bilateral comparison in 1997. Main text. To reach the main text of this paper, click on Final Report. The final report has been peer-reviewed and approved for publication by the CCQM, according to the provisions of the Mutual Recognition Arrangement (MRA).

  5. Controlling firetree in Hawaii by injection of Tordon 22K

    Treesearch

    Gerald A. Walters; William S. Null

    1970-01-01

    Firetree (Myrica faya) has infested more than 40,000 acres of range and forest lands in Hawaii. If the land is to be planted to more desirable range and timber species, this plant pest must be controlled. In trials on the Hamakua Forest Reserve, island of Hawaii, firetrees were effectively controlled by squirting Tordon 22K into notches cut by...

  6. Advanced lead acid battery development project. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-02-01

    This project involved laboratory and road testing of the Horizon (registered) advanced lead acid batteries produced by Electrosource, Inc. A variety of electric vehicles in the fleet operated by the Sacramento Municipal Utility District and McClellan Air Force Base were used for road tests. The project was sponsored by the Defense Advanced Research Projects Agency under RA 93-23 entitled Electric Vehicle Technology and Infrastructure. The Horizon battery is a valve regulated, or sealed, lead acid battery produced in a variety of sizes and performance levels. During the project, several design and process improvements on the Horizon battery resulted in amore » production battery with a specific energy approaching 45 watt-hours per kilogram (Whr/kg) capable of delivering a peak current of 450 amps. The 12 volt, 95 amp-hour (Ahr) Horizon battery, model number 12N95, was placed into service in seven (7) test vehicles, including sedans, prototype lightweight electric vehicles, and passenger vans. Over 20,000 miles have been driven to date on vehicles powered by the Horizon battery. Road test results indicate that when the battery pack is used with a compatible charger and charge management system, noticeably improved acceleration characteristics are evident, and the vehicles provide a useful range almost 20% greater than with conventional lead-acid batteries.« less

  7. Final Report for Project FG02-05ER25685

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Xiaosong Ma

    2009-05-07

    In this report, the PI summarizes the results and achievements obtained in the sponsored project. Overall, the project has been very successful and produced both research results in massive data-intensive computing and data management for large scale supercomputers today, and in open-source software products. During the project period, 14 conference/journal publications, as well as two PhD students, have been produced due to exclusive or shared support from this award. In addition, the PI has recently been granted tenure from NC State University.

  8. Final Report for Project DE-FG02-05ER15718 Fluoropolymers, Electrolytes, Composites and Electrodes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Creager, Stephen

    This report is for a project that was initiated under the title “New Proton-Conducting Fluoropolymer Electrolytes for PEM Fuel Cells”, as part of the DOE program titled “Basic Research for the Hydrogen Fuel Cell Initiative”, Program Notice DE-FG01-04ER04-20. The project received 750,000 dollars in initial funding for a three-year term with a start date of August 15, 2005. Creager was PI and co-PIs were DesMarteau and Smith, all from Clemson. The project was renewed for a second three-year term with a start date of June 15 2008, again for 750,000 dollars, with the new title, “Fluoropolymers, Electrolytes, Composites and Electrodes”.more » Shortly after the renewal was put in place, co-PI Smith left Clemson to accept a position at the University of Texas at Dallas. After a period of no-cost extension the project was renewed on January 1 2013 for another three-year term, this time for a smaller amount ($525,000) and with Thrasher, a new senior hire at Clemson, as co-PI in place of Smith. DesMarteau had retired from Clemson by this time but was retained as a project advisor. After a final one-year no-cost extension for calendar year 2016, the project ended on December 31, 2016, giving it an active period of eleven and one-half years, from August 15 2005 to December 31 2016. The overall objective of this research project has been to create and understand the behavior of new fluoropolymer-based electrolytes and electrodes suitable for use in electrochemical energy storage and conversion devices. The objective was pursued via research on new fluorinated monomers, new polymers and polyelectrolytes (also known as ionomers), and new electrocatalyst supports that in some cases include chemically grafted electrolytes to promote rapid ion transport to electrocatalytically active sites (usually platinum nanoparticles) on the support. The research involved synthesis and characterization of new materials, and creation and use of new measurement techniques that

  9. The Employment Retention and Advancement Project: How Effective Are Different Approaches Aiming to Increase Employment Retention and Advancement? Final Impacts for Twelve Models. Executive Summary

    ERIC Educational Resources Information Center

    Hendra, Richard; Dillman, Keri-Nicole; Hamilton, Gayle; Lundquist, Erika; Martinson, Karin; Wavelet, Melissa

    2010-01-01

    This report summarizes the final impact results for the national Employment Retention and Advancement (ERA) project. This project tested, using a random assignment design, the effectiveness of numerous programs intended to promote steady work and career advancement. All the programs targeted current and former welfare recipients and other low-wage…

  10. 78 FR 26104 - Notice of Final Federal Agency Actions on OR 62: I-5 to Dutton Road (Medford) Project: Jackson...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... Administration (FHWA), Department of Transportation (DOT). ACTION: Notice of limitations on claims for judicial... public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before...

  11. 36 CFR 64.14 - Project inspections.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Project inspections. 64.14... Project inspections. All State and local projects will receive a final inspection by the Bureau. Final... as deemed necessary by the Bureau. Preapproval inspections will also be conducted prior to project...

  12. 36 CFR 64.14 - Project inspections.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Project inspections. 64.14... Project inspections. All State and local projects will receive a final inspection by the Bureau. Final... as deemed necessary by the Bureau. Preapproval inspections will also be conducted prior to project...

  13. 36 CFR 64.14 - Project inspections.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Project inspections. 64.14... Project inspections. All State and local projects will receive a final inspection by the Bureau. Final... as deemed necessary by the Bureau. Preapproval inspections will also be conducted prior to project...

  14. 36 CFR 64.14 - Project inspections.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Project inspections. 64.14... Project inspections. All State and local projects will receive a final inspection by the Bureau. Final... as deemed necessary by the Bureau. Preapproval inspections will also be conducted prior to project...

  15. Final programmatic environmental impact statement for the uranium mill tailings remedial action ground water project. Volume I

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1996-10-01

    This programmatic environmental impact statement (PElS) was prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project to comply with the National Environmental Policy Act (NEPA). This PElS provides an analysis of the potential impacts of the alternatives and ground water compliance strategies as well as potential cumulative impacts. On November 8, 1978, Congress enacted the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law, codified at 42 USC §7901 et seq. Congress found that uranium mill tailings " ... may pose a potential and significant radiation health hazard to the public, and that every reasonablemore » effort should be made to provide for stabilization, disposal, and control in a safe, and environmentally sound manner of such tailings in order to prevent or minimize other environmental hazards from such tailings." Congress authorized the Secretary of Energy to designate inactive uranium processing sites for remedial action by the U.S. Department of Energy (DOE). Congress also directed the U.S. Environmental Protection Agency (EPA) to set the standards to be followed by the DOE for this process of stabilization, disposal, and control. On January 5, 1983, EPA published standards (40 CFR Part 192) for the disposal and cleanup of residual radioactive materials. On September 3, 1985, the U.S. Court of Appeals for the Tenth Circuit set aside and remanded to EPA the ground water provisions of the standards. The EPA proposed new standards to replace remanded sections and changed other sections of 40 CFR Part 192. These proposed standards were published in the Federal Register on September 24, 1987 (52 FR 36000). Section 108 of the UMTRCA requires that DOE comply with EPA's proposed standards in the absence of final standards. The Ground Water Project was planned under the proposed standards. On January 11, 1995, EPA published the final rule, with which the DOE must now comply. The PElS and the Ground Water Project

  16. Manpower Projection Model Project, Ventura County.

    ERIC Educational Resources Information Center

    Van Zant, John L.; Lawson, William H.

    The final report on Phase 1 of the Manpower Projection Model (MPM) Project provides a guide for implementation of the model system by area Vocational Education Practitioners within any Standard Metropolitan Statistical Area (SMSA). A cooperative effort between Ventura County Superintendent of Schools Office and the Community College District, the…

  17. Northwestern Pennsylvania Cooperative Demonstration Project (High Technology). Final Report.

    ERIC Educational Resources Information Center

    Indiana Univ. of Pennsylvania. Center for Vocational Personnel Preparation.

    This document reports on a project designed to customize training for employees of manufacturing industries in six western Pennsylvania counties. Project goals were to facilitate collaborative vocational and technical training programs between educational institutions and private sector companies and to establish demonstration sites, manufacturing…

  18. Manpower Training Coordinators Project. Final Report. Experimental Project in Vocational Education.

    ERIC Educational Resources Information Center

    Smith, E. Jimmy

    On June 1, 1980, the South Carolina Department of Education, Office of Vocational Education, entered into a contractual agreement with the Governor's Office, CETA Division, for the purpose of operating a Manpower Training Coordinators Program in 10 school districts serving rural areas. The project was designed to establish and maintain effective…

  19. Illinois Clean Coal Institute 2005 annual report. Final technical report for the period September 1st, 2004, through August 31, 2005 on projects funded by the Illinois Department of Commerce and Economic Opportunity

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    2005-11-08

    This final technical report contains the abstracts and executive summaries of projects funded through the Illinois Clean Coal Institute solicitation entitled 'Request for proposals No. 04-1(ICCI/RFP04-1)'. Support of these projects is by the Office of Coal Development and Department of Commerce and Economic Opportunity. The projects fall into the following categories: advanced coal mining technologies; coal preparation and coal production business practice; management of coal combustion byproducts; commercialization and technology transfer. Final project extensions are also recorded.

  20. The UIC Therapeutic Partnership Project. Final Report.

    ERIC Educational Resources Information Center

    Lawlor, Mary C.; Cada, Elizabeth A.

    This interdisciplinary inservice training project at the University of Illinois at Chicago was designed to improve early childhood occupational and physical therapy services by developing, implementing, evaluating, and disseminating a comprehensive training model. The competency-based program was designed to address the developmental needs of…

  1. Preservation Planning Project Study Team. Final Report.

    ERIC Educational Resources Information Center

    Pittsburgh Univ., PA. Libraries.

    This final report is a product of a comprehensive 14-month Preservation Planning Program (PPP) self-study conducted by the University of Pittsburgh Libraries, working with the Association of Research Libraries' (ARL) Office of Management Studies. The PPP is designed to put self-help tools into the hands of library staff responsible for developing…

  2. Willow Creek Wildlife Mitigation Project. Final Environmental Assessment.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-04-01

    Today`s notice announces BPA`s proposal to fund land acquisition or acquisition of a conservation easement and a wildlife management plan to protect and enhance wildlife habitat at the Willow Creek Natural Area in Eugene, Oregon. This action would provide partial mitigation for wildlife and wildlife habitat lost by the development of Federal hydroelectric projects in the Willamette River Basin. The project is consistent with BPA`s obligations under provisions of the Pacific Northwest Electric Power Planning and Conservation Act of 1980 as outlined by the Northwest Power Planning Council`s 1994 Columbia River Basin Fish and Wildlife Program. BPA has prepared anmore » environmental assessment (DOE/EA-1023) evaluating the proposed project. Based on the analysis in the EA, BPA has determined that the proposed action is not a major Federal action significantly affecting the quality of the human environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement (EIS) is not required and BPA is issuing this FONSI.« less

  3. Unheard Voices: A Section 353 Special Project. Final Report.

    ERIC Educational Resources Information Center

    Strunk, Sandra J.

    "Unheard Voices" was a project designed to provide adult educators with specific guidelines and ideas for integrating a creative writing component into an existing program of adult basic education, General Educational Development, or English as a second language. The project also collected and published student poetry and fiction in…

  4. Final Technical Report for Year 5 Early Career Research Project "Viscosity and equation of state of hot and dense QCD matter"

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Molnar, Denes

    2016-05-25

    The Section below summarizes research activities and achievements during the fifth (last) year of the PI’s Early Career Research Project (ECRP). Unlike the first four years of the project, the last year was not funded under the American Recovery and Reinvestment Act (ARRA). The ECRP advanced two main areas: i) radiative 3 ↔ 2 radiative transport, via development of a new computer code MPC/Grid that solves the Boltzmann transport equation in full 6+1D (3X+3V+time); and ii) application of relativistic hydrodynamics, via development of a self-consistent framework to convert viscous fluids to particles. In Year 5 we finalized thermalization studies withmore » radiative gg ↔ ggg transport (Sec. 1.1.1) and used nonlinear covariant transport to assess the accuracy of fluid-to-particle conversion models (Sec. 1.1.2), calculated observables with self-consistent fluid-to-particle conversion from realistic viscous hydrodynamic evolution (Secs. 1.2.1 and 1.2.2), extended the covariant energy loss formulation to heavy quarks (Sec. 1.4.1) and studied energy loss in small systems (Sec. 1.4.2), and also investigated how much of the elliptic flow could have non-hydrodynamic origin (Sec 1.3). Years 1-4 of the ECRP were ARRA-funded and, therefore, they have their own report document ’Final Technical Report for Years 1-4 of the Early Career Research Project “Viscosity and equation of state of hot and dense QCD matter”’ (same award number DE-SC0004035). The PI’s group was also part of the DOE JET Topical Collaboration, a multi-institution project that overlapped in time significantly with the ECRP. Purdue achievements as part of the JET Top- ical Collaboration are in a separate report “Final Technical Report summarizing Purdue research activities as part of the DOE JET Topical Collaboration” (award DE-SC0004077).« less

  5. K-12 Urban Career Education Infusion Project. Final Evaluation

    ERIC Educational Resources Information Center

    Denton, William T.; Kleck, Wil

    The K-12 Urban Career Education Infusion Project of the Dallas (Texas) Independent School District focused on fourteen schools located in the East Oak Cliff Subdistrict, a predominantly (98%) black community. Conducted in two phases, the project attempted to demonstrate that through infusing career education into the existing curriculum, trained…

  6. Project Familia. Final Evaluation Report, 1992-93. OREA Report.

    ERIC Educational Resources Information Center

    Clarke, Candice

    Project Familia was an Elementary and Secondary Education Act Title VII funded project that, in the year covered by this evaluation, served 41 special education students of limited English proficiency (LEP) from 5 schools, with the participation of 54 parents and 33 siblings. Participating students received English language enrichment and…

  7. Language Integrated Technology Project Final Evaluation Report.

    ERIC Educational Resources Information Center

    Stiegemeier, Lois

    The goal of the Language Integrated Technology Grant Project (LIT) consortium was to help provide critical components of successful reading programs through a combination of proven computer/print programs and teacher training. Through leadership provided by the Educational Service District 113 (Olympia, Washington), the LIT consortium of schools…

  8. 15 CFR 2301.24 - Final Federal payment.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... reasonable costs incurred in completing the planning or construction project are less than the total project..., however, the actual costs incurred in completing the project are more than the estimated total project costs, in no case will the final Federal funds paid exceed the grant award. ...

  9. Final Report Navajo Transmission Project (NTP)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bennie Hoisington; Steven Begay

    2006-09-14

    The Diné Power Authority is developing the Navajo Transmission Project (NTP) to relieve the constraints on the transmission of electricity west of the Four Corners area and to improve the operation flexibility and reliability of the extra-high-voltage transmission system in the region. The NTP creates the wholesale transmission capacity for more economical power transfers, sales, and purchases in the region. It will facilitate the development of Navajo energy resources, improve economic conditions on the Navajo Nation as well as allow DPA to participate in the western electrical utility industry.

  10. The Impact of Head Start on Children, Families and Communities. Final Report of the Head Start Evaluation, Synthesis and Utilization Project.

    ERIC Educational Resources Information Center

    McKey, Ruth Hubbell; And Others

    Including all Head Start research (both published and unpublished) and using, when possible, the statistical technique of meta-analysis, this final report of the Head Start Evaluation, Synthesis, and Utilization Project presents findings on the impact of Head Start on children's cognitive and socioemotional development, on child health and health…

  11. Rural Math Excel Partnership (RMEP) Project Final Performance Report

    ERIC Educational Resources Information Center

    Harmon, Hobart; Tate, Veronica; Stevens, Jennifer; Wilborn, Sandy; Adams, Sue

    2018-01-01

    The goal of the Rural Math Excel Partnership (RMEP) project, a development project funded by the U.S. Department of Education Investing in Innovation (i3) grant program, was to develop a model of shared responsibility among families, teachers, and communities in rural areas as collective support for student success in and preparation for advanced…

  12. Look into the Future: Displaced Clerical Project. Final Report.

    ERIC Educational Resources Information Center

    Stover, Deborah A.

    "Look into the Future" is a program created by a Job Training Partnership Act project and 9to5, Working Women Education Fund, to address the training and retraining needs of office workers in light of the advances in computer and communications systems. This guide describes the model project and suggests steps other organizations can…

  13. Bilingual Adult Basic Education Project. Final Report.

    ERIC Educational Resources Information Center

    Graham, Janet Roth

    The Bilingual Adult Basic Education Project provided bilingual life skills instruction, counseling, and informational services to approximately 150 non-English-dominant adults across Pennsylvania by means of contracts to local education agencies. Students were pre- and post-tested in English and/or their native language to measure their growth in…

  14. The Final Phase of Drilling of the Hawaii Scientific Drilling Project

    NASA Astrophysics Data System (ADS)

    Stolper, E.; Depaolo, D.; Thomas, D.; Garcia, M.; Haskins, E.; Baker, M.

    2008-12-01

    The principal goal of the Hawaii Scientific Drilling Project (HSDP) was to core continuously deep into the flank of a Hawaiian volcano and to investigate the petrology, geochemisty, geochronology, magnetics, etc. of the recovered samples. Drilling in Hilo, on the island of Hawaii proceeded in three phases. A 1.06 km pilot hole was core-drilled in 1993; a second hole was core-drilled to 3,098 meters below sea level (mbsl) in 1999, then deepened in 2004-2007 to 3,509 mbsl. Although the final phase of drilling was at times technically challenging, core recovery was close to 100%. All rocks from the final phase of drilling were emplaced below sea level and are from the Mauna Kea volcano. On-site core logging identified 45 separate units (the 1999 phase of drilling yielded 345 units). Five lithologies were identified: pillows (~60%); pillow breccias (~10%); massive lavas (~12%); hyaloclastites (~17%); intrusives (~1%; these are mostly multiple thin (down to cm scale) fingers of magma with identical lithologies occurring over narrow depth intervals). The rocks are primarily tholeiitic, ranging from aphyric to highly olivine-phyric lavas (up to ~25% olivine phenocrysts), with considerable fresh glass and olivine; clays and zeolites are present throughout the core. Forty whole-rock samples were collected as a reference suite and sent to multiple investigators for study. Additionally, glass was collected at roughly 3 m intervals for electron microprobe analysis. Although continuous and consistent with the shallower rocks from the previous phase of coring, there are several noteworthy features of the deepest core: (1) Glasses from shallower portions of the core exhibited bimodal silica contents, a low SiO2 group (~48-50 wt.%) and a high SiO2 group (~50.5- 52 wt.%). Glasses from the last phase of drilling are essentially all in the high-silica group and are somewhat more evolved than the high-silica glasses from the shallower portion of the core (5.1-7.6 vs. 5.1-10.4 wt.% Mg

  15. Call to Publish in an Undergraduate Medical Course: Dissemination of the Final-Year Research Project.

    PubMed

    Barbosa, Joselina Maria Pinto; Magalhães, Sónia Isabel Costa; Ferreira, Maria Amélia Duarte

    2016-01-01

    Today's medical doctors must not only have the clinical skills to treat patients effectively but also keep current with new advances in medicine and critically analyze evidence to choose the best treatments and explain the risks and benefits of different options. In this article, we aim to share the approach taken at a Portuguese medical school to promote a close connection between research and learning. In a blended-learning approach, students studied research and scientific methods and undertook one of three faculty-supervised research and dissemination projects. To support immediate application of new research knowledge, students were offered optional short lectures and problem sets. All course information was featured on a website that also supported a discussion forum. We analyzed 1,350 theses leading to the medical degree, defended in six consecutive academic years (2007-2013). Our aim was to estimate the publication rates and factors associated with publication of the final-year undergraduate research projects. The present research curriculum was developed at the University of Porto Faculty of Medicine as part of the Bologna process curriculum implemented in the 2007-2008 academic year. From May to June 2014 we looked for corresponding articles published over the period of September 2007 to April 2014. We searched PubMed, Scielo, Scopus, and IndexRMP databases to locate publications resulting from student theses. Over 6 years, the diffusion of knowledge produced by medical students, who engaged in clinical practice concurrently with research projects, was fairly low (10.4%). Program modifications that increased student accountability and engagement allowed for an increased rate of publication from 1.0% to 23.9%. Factors associated with publication were research area, publication as a performance assessment criterion, and publication language. The results of this study suggest that it is helpful to provide research opportunities that allow aspiring future

  16. NGA/ACT Pilot Project: Increasing Course Rigor. Final Report

    ERIC Educational Resources Information Center

    ACT, Inc., 2008

    2008-01-01

    The Increasing Course Rigor Pilot Project, a joint initiative of the National Governors Association (NGA) Center for Best Practices and ACT, Inc., is one component of Phase Two of the NGA Center for Best Practices Honor States Grant Program. The project, which began in winter 2006 and concluded in summer 2007, was designed to improve the quality…

  17. The 'end of AIDS' project: Mobilising evidence, bureaucracy, and big data for a final biomedical triumph over AIDS.

    PubMed

    Leclerc-Madlala, Suzanne; Broomhall, Lorie; Fieno, John

    2017-12-04

    Efforts are currently underway by major orchestrators and funders of the global AIDS response to realise the vision of achieving an end to AIDS by 2030. Unlike previous efforts to provide policy guidance or to encourage 'best practice' approaches for combatting AIDS, the end of AIDS project involves the promotion of a clear set of targets, tools, and interventions for a final biomedical solution to the epidemic. In this paper, we examine the bureaucratic procedures of one major AIDS funder that helped to foster a common vision and mission amongst a global AIDS community with widely divergent views on how best to address the epidemic. We focus on the methods, movements, and materials that are central to the project of ending AIDS, including those related to biomedical forms of evidence and big data science. We argue that these approaches have limitations and social scientists need to pay close attention to the end of AIDS project, particularly in contexts where clinical interventions might transform clinical outcomes, but where the social, economic, and cultural determinants of HIV and AIDS remain largely intact and increasingly obscured.

  18. ESEA Title I Linking Project. Final Report.

    ERIC Educational Resources Information Center

    Holmes, Susan E.

    The Rasch model for test score equating was compared with three other equating procedures as methods for implementing the norm referenced method (RMC Model A) of evaluating ESEA Title I projects. The Rasch model and its theoretical limitations were described. The three other equating methods used were: linear observed score equating, linear true…

  19. [The final situation in the Turkey "Stent for Life" project].

    PubMed

    Ertaş, Gökhan; Kozan, Omer; Değertekin, Muzaffer; Kervan, Umit; Aksoy, Mehmet; Koç, Orhan; Göktekin, Omer

    2012-09-01

    The Stent for Life (SFL) project's main mission is to increase the use of primary percutaneous coronary intervention (PCI) in more than 70% of all acute ST segment elevation myocardial infarction (STEMI) patients. Previous to the SFL project, thrombolysis was the dominant reperfusion strategy since a low percentage of acute STEMI patients had access to primary PCI in our country. In this study, we present the main barriers of access to primary PCI in the centers that were involved with the SFL project. Patients with acute STEMI admitted to the centers that were involved in the SFL project between 2009 and 2011 were included in the analysis. Since the inception of the SFL project, the primary PCI rate has reached over 90% in SFL pilot cities. In the last 5 years, the number of ambulances and emergency stations has increased. Since the collaboration with 112 Emergency Service, a great majority of cases were reached via the emergency medical system. The mean door-to-balloon time for the pilot cities was 54.72±43.66 minutes. After three years of the SFL project, primary PCI has emerged as the preferred reperfusion strategy for patients with STEMI in pilot cities.

  20. Physically Handicapped in Science: Final Project Report.

    ERIC Educational Resources Information Center

    O'Brien, Maureen B.; And Others

    A two-year project was conducted by St. Mary's Junior College to improve the science literacy of visually-impaired students (VIS) through the adaptation of instructional methods and materials. A four-step process was used: (1) learning materials were reviewed to identify problem areas; (2) preliminary adaptations were made based on the review; (3)…

  1. "Project Outreach," Final Report, December 31, 1979.

    ERIC Educational Resources Information Center

    Latzer, Robert M.

    Fall 1979 activities for Project Outreach, a faculty development program at Jersey City State College, are described. Problems involved in carrying out these activities, a statement of expenditures and balances, and a set of recommendations are covered. Four areas of activity planned at the college were: a second series of study skills seminars, a…

  2. Final Report. Montpelier District Energy Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baker, Jessie; Motyka, Kurt; Aja, Joe

    2015-03-30

    The City of Montpelier, in collaboration with the State of Vermont, developed a central heat plant fueled with locally harvested wood-chips and a thermal energy distribution system. The project provides renewable energy to heat a complex of state buildings and a mix of commercial, private and municipal buildings in downtown Montpelier. The State of Vermont operates the central heat plant and the system to heat the connected state buildings. The City of Montpelier accepts energy from the central heat plant and operates a thermal utility to heat buildings in downtown Montpelier which elected to take heat from the system.

  3. Subsistence restoration project: Food safety testing. Exxon Valdez Oil Spill Restoration Project. Final report restoration project 94279

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miraglia, R.A.; Chartrand, A.W.

    1997-05-01

    The goal of this project was to restore the confidence of subsistence users in their abilities to determine the safety of their resources. Methods included community meetings, collection and testing of subsistence resources samples for hydrocarbon contamination, accompanying community representatives on tours of the laboratory where tests were conducted and informational newsletters. Over the two years of the project combined, 228 composite samples of edible tissues from shellfish were tested. The bile of forty rockfish, six sockeye salmon, twelve seals, twenty-three ducks were tested for the presence of hydrocarbon metabolites. Edible tissue (blubber) from seals was also tested. Generally, themore » tests showed such low levels of hydrocarbons and their metabolites, as to be within the test`s margin of error. The project was partly successful in disseminating the subsistence food safety advice of the Oil Spill Health Task Force and in improving the level of trust in the results of hydrocarbon tests on the resources.« less

  4. Mobilizing Adult Basic Education. Final Project Report.

    ERIC Educational Resources Information Center

    Fausto, Vincent J.

    An adult basic education (ABE) project was undertaken in 1977 in southern New Jersey to take instruction to students in rural areas. The region was one in which some 75% of the population had not completed high school. Centered in Millville with satellite centers in four rural townships whose secondary students are bussed to Millville, the project…

  5. US Climate Variability and Predictability (CLIVAR) Project- Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patterson, Mike

    The US CLIVAR Project Office administers the US CLIVAR Program with its mission to advance understanding and prediction of climate variability and change across timescales with an emphasis on the role of the ocean and its interaction with other elements of the Earth system. The Project Office promotes and facilitates scientific collaboration within the US and international climate and Earth science communities, addressing priority topics from subseasonal to centennial climate variability and change; the global energy imbalance; the ocean’s role in climate, water, and carbon cycles; climate and weather extremes; and polar climate changes. This project provides essential one-year supportmore » of the Project Office, enabling the participation of US scientists in the meetings of the US CLIVAR bodies that guide scientific planning and implementation, including the scientific steering committee that establishes program goals and evaluates progress of activities to address them, the science team of funded investigators studying the ocean overturning circulation in the Atlantic, and two working groups tackling the priority research topics of Arctic change influence on midlatitude climate and weather extremes and the decadal-scale widening of the tropical belt.« less

  6. LSCA Final Reports: Third Series.

    ERIC Educational Resources Information Center

    Clark, Collin, Ed.

    This document includes final summary reports from 16 recent federally funded Library Services and Construction Act (LSCA) projects in California. This volume covers generally the period 1984-85, and reports are presented in six subject areas: programs for children, information and referral projects, institutional services, literacy, local history,…

  7. Emergency Fish Restoration Project; Final Report 2002.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LeCaire, Richard

    Lake Roosevelt is a 151-mile impoundment created by the construction of Grand Coulee Dam during the early 1940's. The construction of the dam permanently and forever blocked the once abundant anadromous fish runs to the upper Columbia Basin. Since the construction of Grand Coulee Dam in 1943 and Chief Joseph Dam in 1956 this area is known as the blocked area. The blocked area is totally dependant upon resident fish species to provide a subsistence, recreational and sport fishery. The sport fishery of lake Roosevelt is varied but consists mostly of Rainbow trout (Oncorhynchus mykiss), Kokanee salmon (Oncorhynchus nerka), Walleyemore » (Stizostedion vitreum) Small mouth bass (Micropterus dolomieui) and white sturgeon (Acipenser transmontanus). Currently, Bonneville Power Administration funds and administers two trout/kokanee hatcheries on Lake Roosevelt. The Spokane Tribe of Indians operates one hatchery, the Washington Department of Fish and Wildlife the other. In addition to planting fish directly into Lake Roosevelt, these two hatcheries also supply fish to a net pen operation that also plants the lake. The net pen project is administered by Bonneville Power funded personnel but is dependant upon volunteer labor for daily feeding and monitoring operations. This project has demonstrated great success and is endorsed by the Colville Confederated Tribes, the Spokane Tribe of Indians, the Washington Department of Fish and Wildlife, local sportsmen associations, and the Lake Roosevelt Forum. The Lake Roosevelt/Grand Coulee Dam area is widely known and its diverse fishery is targeted by large numbers of anglers annually to catch rainbow trout, kokanee salmon, small mouth bass and walleye. These anglers contribute a great deal to the local economy by fuel, grocery, license, tackle and motel purchases. Because such a large portion of the local economy is dependant upon the Lake Roosevelt fishery and tourism, any unusual operation of the Lake Roosevelt system may have a

  8. Project Senior. Innovations in Educational Programming for the Elderly. A Pilot Project: Thermopolis, Wyoming. [Final Report].

    ERIC Educational Resources Information Center

    Owsley, Jean

    A pilot project, entitled Project Senior, was developed and implemented to provide innovative educational programing for older adults in the small rural setting of Thermopolis, Wyoming. Included among the major project activities were the following: a door-to-door survey of 759 persons over 55 years old to determine those courses most desired by…

  9. Final report of the decontamination and decommissioning of Building 1 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 1more » was found to be radiologically contaminated and was demolished in 1996. The soil beneath and adjacent to the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  10. LSCA Final Reports: Second Series.

    ERIC Educational Resources Information Center

    Clark, Collin, Ed.

    This document includes final summary reports from recent federally funded Library Services and Construction Act (LSCA) demonstration projects in California. While some projects reported at length and others provided the bare facts, reports are excerpted but published as received, without editing beyond a uniform first page. The Summary Report Form…

  11. Snow removal performance metrics : final report.

    DOT National Transportation Integrated Search

    2017-05-01

    This document is the final report for the Clear Roads project entitled Snow Removal Performance Metrics. The project team was led by researchers at Washington State University on behalf of Clear Roads, an ongoing pooled fund research effort focused o...

  12. Technical Assistance in Evaluating Career Education Projects. Final Report. Volume II: Final Career Education Evaluation Report.

    ERIC Educational Resources Information Center

    Stenner, A. Jackson; And Others

    This document contains the second of five volumes reporting the activities and results of a career education evaluation project conducted to accomplish the following two objectives: (1) to improve the quality of evaluations by career education projects funded by the United States Office of Career Education (OCE) through the provision of technical…

  13. Wizard of Work. V.A. Employment & Training Project. The Magic Continues. Final Report & Project Analysis.

    ERIC Educational Resources Information Center

    Gaither, Dick; Baker, John

    An Indianapolis (Indiana) project gave disadvantaged junior high and high school students summer jobs in various departments of a Veterans' Administration hospital. The project combined work with at least 1 hour per day of computerized instruction in basic mathematics and language, work maturity, and specific job competencies. Rules were strict,…

  14. 2009 ESMD Space Grant Faculty Project Final Report

    NASA Technical Reports Server (NTRS)

    Murphy, Gloria; Ghanashyam, Joshi; Guo, Jiang; Conrad, James; Bandyopadhyay, Alak; Cross, William

    2009-01-01

    The Constellation Program is the medium by which we will maintain a presence in low Earth orbit, return to the moon for further exploration and develop procedures for Mars exploration. The foundation for its presence and success is built by the many individuals that have given of their time, talent and even lives to help propel the mission and objectives of NASA. The Exploration Systems Mission Directorate (ESMD) Faculty Fellows Program is a direct contributor to the success of directorate and Constellation Program objectives. It is through programs such as the ESMD Space Grant program that students are inspired and challenged to achieve the technological heights that will propel us to meet the goals and objectives of ESMD and the Constellation Program. It is through ESMD Space Grant programs that future NASA scientists, engineers, and mathematicians begin to dream of taking America to newer heights of space exploration. The ESMD Space Grant program is to be commended for taking the initiative to develop and implement programs that help solidify the mission of NASA. With the concerted efforts of the Kennedy Space Center educational staff, the 2009 ESMD Space Grant Summer Faculty Fellows Program allowed faculty to become more involved with NASA personnel relating to exploration topics for the senior design projects. The 2009 Project was specifically directed towards NASA's Strategic Educational Outcome 1. In-situ placement of Faculty Fellows at the NASA field Centers was essential; this allowed personal interactions with NASA scientists and engineers. In particular, this was critical to better understanding the NASA problems and begin developing a senior design effort to solve the problems. The Faculty Fellows are pleased that the ESMD Space Grant program is taking interest in developing the Senior Design courses at the university level. These courses are needed to help develop the NASA engineers and scientists of the very near future. It has been a pleasure to be

  15. Demography and movements of the endangered Akepa and Hawaii Creeper

    Treesearch

    C. John Ralph; Steven G. Fancy

    1994-01-01

    We studied populations of the endangered Akepa (Loxops coccineus coccineus) and Hawaii Creeper (Oreomystis mana) at four sites on the island of Hawaii. Mean monthly density (± SE) of Akepa was 5.74 ± 0.87, 1.35 ± 0.41, 0.96 ± 0.13, and 0.76 ± 0.12 Akepa/ha at Kau Forest, Hamakua, Keauhou Ranch, and Kilauea Forest study areas,...

  16. THz transceiver characterization : LDRD project 139363 final report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nordquist, Christopher Daniel; Wanke, Michael Clement; Cich, Michael Joseph

    2009-09-01

    LDRD Project 139363 supported experiments to quantify the performance characteristics of monolithically integrated Schottky diode + quantum cascade laser (QCL) heterodyne mixers at terahertz (THz) frequencies. These integrated mixers are the first all-semiconductor THz devices to successfully incorporate a rectifying diode directly into the optical waveguide of a QCL, obviating the conventional optical coupling between a THz local oscillator and rectifier in a heterodyne mixer system. This integrated mixer was shown to function as a true heterodyne receiver of an externally received THz signal, a breakthrough which may lead to more widespread acceptance of this new THz technology paradigm. Inmore » addition, questions about QCL mode shifting in response to temperature, bias, and external feedback, and to what extent internal frequency locking can improve stability have been answered under this project.« less

  17. Agricultural Energy Curriculum Development Project. Research and Development Project in Career Education, Vocational. Final Project.

    ERIC Educational Resources Information Center

    Wacholz, Marlin

    A project was conducted to develop energy instructional units which would fit into each year of a three-year farm business management curriculum. Four curriculum units which focus on fertilizer management in crop production were developed. The first unit was designed to develop farmers' awareness of energy as a vital resource to their businesses…

  18. Practical Approaches to Curriculum Development. A Management Handbook. Project HIRE: A Curriculum Management System for Instructing the Handicapped. Final Report, Volume 2.

    ERIC Educational Resources Information Center

    Gardner, David C.; Beatty, Grace Joely

    Within the context of the major objectives of developing, field testing, and refining the curriculum materials described in volume 1 of this final report (CE 024 117), Volume 2 describes and critiques the management system used by Project HIRE in that development process. (See Note for availability of curriculum materials.) Chapter 1 introduces…

  19. Work Analysis Specialist Project. Final Report. Project Number 325-81-111-2.

    ERIC Educational Resources Information Center

    Gordon, Donald M.

    This project was conducted in New Castle (Henry County), Indiana to train and use the services of a work analysis specialist who would work with manufacturing companies to improve company profits through the provision of training programs based on a specific needs assessment. The determination of specific needs was accomplished through the…

  20. Lagoon Restoration Project: Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    This project is a multiyear effort focusing on energy flow in the Palace of Fine Arts lagoon just outside the Exploratorium in San Francisco. Phase 1 was a pilot study to determine the feasibility of improving biological energy flow through the small freshwater lagoon, using the expertise and resources of an environmental artist in collaboration with museum biologists and arts department staff. The primary outcome of Phase 1 is an experimental fountain exhibit inside the museum designed by public artist Laurie Lundquist with Exploratorium staff. This fountain, with signage, functions both as a model for natural aeration and filtration systemsmore » and as a focal point for museum visitors to learn about how biological processes cycle energy through aquatic systems. As part of the study of the lagoon`s health, volunteers continued biweekly bird consus from March through September, 1994. The goal was to find out whether the poor water quality of the lagoon is affecting the birds. Limited dredging was undertaken by the city Parks and Recreation Department. However, a more peermanent solution to the lagoon`s ecological problems would require an ambitious redesign of the lagoon.« less

  1. Final Scientifc Report - Hydrogen Education State Partnership Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leon, Warren

    2012-02-03

    Under the leadership of the Department of Energy Hydrogen and Fuel Cells program, Clean Energy States Alliance (CESA) educated and worked with state leaders to encourage wider deployment of fuel cell and hydrogen technologies. Through outreach to state policymakers, legislative leaders, clean energy funds, energy agencies, and public utility commissions, CESA worked to accomplish the following objectives of this project: 1. Provide information and technical assistance to state policy leaders and state renewable energy programs in the development of effective hydrogen fuel cell programs. 2. Identify and foster hydrogen program best practices. 3. Identify and promote strategic opportunities for statesmore » and the Department of Energy (DOE) to advance hydrogen technology deployment through partnerships, collaboration, and targeted activities. Over the three years of this project, CESA, with our partner National Conference of State Legislatures (NCSL), was able to provide credible information on fuel cell policies, finance, and technical assistance to hundreds of state officials and other stakeholders. CESA worked with its membership network to effectively educate state clean energy policymakers, program managers, and decision makers about fuel cell and hydrogen technologies and the efforts by states to advance those technologies. With the assistance of NCSL, CESA gained access to an effective forum for outreach and communication with state legislators from all 50 states on hydrogen issues and policies. This project worked to educate policymakers and stakeholders with the potential to develop and deploy stationary and portable fuel cell technologies.« less

  2. Planning a Gender Fair as a Semester-Long Final Project

    ERIC Educational Resources Information Center

    Enck, Suzanne Marie

    2015-01-01

    This semester-long activity for a "Gender Fair" project helps undergraduate students gain an appreciation of gender as a social, historical, and cultural construction that is constituted intersectionally (with race-class-sexuality, at minimum) and fundamentally through communication practices. Specifically, upon completing this project,…

  3. Project UPSTART. Final Report, October 1, 1982-September 30, 1983.

    ERIC Educational Resources Information Center

    Frain, Joan

    The report examines accomplishments of project UPSTART, an intervention approach for young severely multihandicapped infants and their families. The project's outreach provided assistance at six sites, three of which were new. Outreach accomplishments are evaluated according to six objectives, including stimulation of program development,…

  4. Artificial Retina Project: Final Report for CRADA ORNL 01-0625

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Greenbaum, E; Little, J

    The U.S. Department of Energy’s Artificial Retina Project is a collaborative, multi-institutional effort to develop an implantable microelectronic retinal prosthesis that restores useful vision to people blinded by retinal diseases. The ultimate goal of the project is to restore reading ability, facial recognition, and unaided mobility in people with retinitis pigmentosa and age-related macular degeneration. The project taps into the unique research technologies and resources developed at DOE national laboratories to surmount the many technical challenges involved with developing a safe, effective, and durable product. The research team includes six DOE national laboratories, four universities, and private industry.

  5. Horticulture Therapy Curriculum Development. Final Report.

    ERIC Educational Resources Information Center

    Taylor, Sally; And Others

    This final report includes two major components: a narrative describing a project at Edmonds Community College, Washington, to develop a horticultural therapy curriculum and descriptions of six courses developed or revised during the project. The narrative reports the development of a supplementary interdisciplinary certification program to train…

  6. Project EXCEL. Final Performance Report, March 1, 1991-October 31, 1992.

    ERIC Educational Resources Information Center

    Career Resources Development Center, Inc., San Francisco, CA.

    Project EXCEL is a workplace literacy project involving four small business enterprises in San Francisco. Over a 19-month period, the project focused on literacy and basic skills training for 271 limited-English-proficient (LEP) workers. All training was conducted at the work sites, and a variety of support services were provided, including…

  7. Final report of the decontamination and decommissioning of Building 6 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the domestic uranium procurement program funded by the U.S. Atomic Energy Commission. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial actionmore » contractor. Radiological contamination was identified in Building 6, and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  8. Final report of the decontamination and decommissioning of Building 39 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial action contractor. The soilmore » beneath Building 39 was radiologically contaminated and the building was demolished in 1992. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  9. Final report of the decontamination and decommissioning of Building 18 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. The soilmore » beneath Building 18 was found to be radiologically contaminated; the building was not contaminated. The soil was remediated in accordance with identified standards. Building 18 and the underlying soil can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  10. Alabama 622 Project Services to Deaf-Blind Children. Final Report.

    ERIC Educational Resources Information Center

    Graham, Terry; Bosarge, Zackie

    This report describes activities and accomplishments of a 3-year federally supported project to improve services to children (ages 0-21) with deaf-blindness in Alabama. The project utilized a service delivery model based on provision of state, regional, local, and individual technical assistance to service providers and families through three…

  11. Final evaluation Report, 1975-76. ESAA III Pilot Project Assist.

    ERIC Educational Resources Information Center

    Austin Independent School District, TX. Office of Research and Evaluation.

    This evaluation report is presented at the conclusion of the third year of Project Assist, a program funded under the Emergency School Assistant Act (ESAA). The main focus of the project was on improving student reading and mathematics skills primarily through contact with instructional teacher aides and special supplementary instructional…

  12. Project on Social Architecture in Education. Final Report. Part III: Case Studies. Chapter 9: Arts Co-op: An Experimental High School Program.

    ERIC Educational Resources Information Center

    Sullivan, Ellen Wahl

    This document contains chapter 9 of the final report of the Project on Social Architecture in Education. Chapter 9 is about a regional experimental high school program for the arts. Several features distinguished Arts Co-op from the other schools in the study. For one, it was a special purpose school, focused on the arts, and not offering a…

  13. Achievement Motivation Development Project. Final Report. Appendix IV, Part 2.

    ERIC Educational Resources Information Center

    McClelland, David C.; Alschuler, Alfred S.

    The Achievement Motivation Development Project is described. The Project has culminated in the development of course materials designed explicitly to promote aspects of psychological growth. As such, it is viewed as but one thrust in an emerging psychological education movement. Achievement motivation is defined as a way of planning, a set of…

  14. Career Education Demonstration Project for American Indian Children. Final Report.

    ERIC Educational Resources Information Center

    South Dakota Univ., Vermillion. School of Education.

    Marty Indian School (Marty, South Dakota) served as the pilot school for this career education demonstration project for American Indian children. The project focused on grades K-4 and emphasized helping the students develop an awareness of self, an awareness of others, and an awareness of careers. Two needs assessment instruments (appended to…

  15. Ice Load Project Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCoy, Timothy J.; Brown, Thomas; Byrne, Alex

    As interest and investment in offshore wind projects increase worldwide, some turbines will be installed in locations where ice of significant thickness forms on the water surface. This ice moves under the driving forces of wind, current, and thermal effects and may result in substantial forces on bottom-fixed support structures. The North and Baltic Seas in Europe have begun to see significant wind energy development and the Great Lakes of the United States and Canada may host wind energy development in the near future. Design of the support structures for these projects is best performed through the use of anmore » integrated tool that can calculate the cumulative effects of forces due to turbine operations, wind, waves, and floating ice. The dynamic nature of ice forces requires that these forces be included in the design simulations, rather than added as static forces to simulation results. The International Electrotechnical Commission (IEC) standard[2] for offshore wind turbine design and the International Organization for Standardization (ISO) standard[3] for offshore structures provide requirements and algorithms for the calculation of forces induced by surface ice; however, currently none of the major wind turbine dynamic simulation codes provides the ability to model ice loads. The scope of work of the project described in this report includes the development of a suite of subroutines, collectively named IceFloe, that meet the requirements of the IEC and ISO standards and couples with four of the major wind turbine dynamic simulation codes. The mechanisms by which ice forces impinge on offshore structures generally include the forces required for crushing of the ice against vertical-sided structures and the forces required to fracture the ice as it rides up on conical-sided structures. Within these two broad categories, the dynamic character of the forces with respect to time is also dependent on other factors such as the velocity and thickness of the

  16. Wyoming Deaf/Blind Grant. Final Report.

    ERIC Educational Resources Information Center

    Whitson, Joanne B.

    This final report describes activities and accomplishments of the Wyoming Deaf-Blind Grant, a 3-year federally supported project to identify children who have deaf-blindness and to provide technical assistance in the development of educational services for these children. Major accomplishments of the project included: identification of more…

  17. The Human Genome Project: Information access, management, and regulation. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McInerney, J.D.; Micikas, L.B.

    The Human Genome Project is a large, internationally coordinated effort in biological research directed at creating a detailed map of human DNA. This report describes the access of information, management, and regulation of the project. The project led to the development of an instructional module titled The Human Genome Project: Biology, Computers, and Privacy, designed for use in high school biology classes. The module consists of print materials and both Macintosh and Windows versions of related computer software-Appendix A contains a copy of the print materials and discs containing the two versions of the software.

  18. A Model System for the Design and Maintenance of Related Instruction Curriculum for Approved U.S. Department of Labor Apprenticeship Programs; Phase III. Final Report and Final Evaluation Report.

    ERIC Educational Resources Information Center

    Lane Community Coll., Eugene, OR.

    A final report and final evaluation report of Phase III are provided for a project to establish a national clearinghouse for apprenticeship-related instructional materials. The final report provides a summary and a narrative account of these project activities: identification of materials; identification of apprenticeship curriculum needs;…

  19. Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taddeucci, Joe

    2013-03-29

    The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Betweenmore » 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new

  20. Good Citizens through Literacy Network. A 353 Project Final Report.

    ERIC Educational Resources Information Center

    Leto, Lyn

    An adult basic education (ABE) class was developed to help parolees of the Schuylkill County Prison develop reading, writing, and communication skills and use those skills in a community service project aimed at helping at-risk youth. Parolees were recruited into the project through county parole officers, and their reading, writing, self-esteem,…

  1. Final Report on the Multicultural/Diversity Assessment Project.

    ERIC Educational Resources Information Center

    Ambrosio, Anthony L.

    The Emporia State University Multicultural/Diversity Project developed a set of assessment instruments and a model evaluation plan to assess multicultural/diversity (MCD) outcomes in teacher education and general education programs. Assessment instruments and techniques were constructed to evaluate the impact of coursework on student attitudes,…

  2. Project Data-Tech. Final Evaluation Report, 1993-1994. OER Report.

    ERIC Educational Resources Information Center

    Roman, Elliott M.

    Project Data-Tech was an Elementary and Secondary Education Act Title VII-funded project in its fifth and last year of operation at a high school in Brooklyn (New York). The program served a total of 131 Haitian- and Spanish-speaking students, most of whom were of limited English proficiency, 54 fewer than in the previous year. Participating…

  3. The Lanai Visitor Serving Workplace Literacy Project: Final Performance Report.

    ERIC Educational Resources Information Center

    Hawaii Human Development, Honolulu.

    This report describes the outcomes of a project designed to aid agricultural workers in their transition to hotel jobs. Displaced workers (predominantly Filipino) from a Dole plantation were forced to seek employment in new resorts on Lanai. The goals of the project were to: (1) qualify former Dole employees for jobs in the newly-developed resort…

  4. Lafayette Parish Cooperative Jail Project--LPCJP. Phase III Final Report.

    ERIC Educational Resources Information Center

    Lafayette Parish School Board, LA.

    A three-phase project was conducted to further the education of inmates in the Lafayette (Louisiana) Parish Correctional Center. Phase I of the project was designed to prepare inmates to be eligible to take the General Educational Development (GED) test, and/or to teach life-coping skills so that they would better function in society upon their…

  5. How do the Polytechnic Students Cope with the Difficulties in Composing Abstracts for Their Final Projects?

    NASA Astrophysics Data System (ADS)

    Niswatin, C.; Latief, M. A.; Suharyadi, S.

    2018-02-01

    This research aims to uncover the fact about engineering students in dealing with composing abstracts for their final projects. The research applies a descriptive qualitative quantitative design. The data were collected through questioners involving 104 engineering students, including the alumni at Politeknik Kota Malang, Indonesia. Furthermore, interviews were carried out to explain the details where necessary to support the primary data. It is found that the common problems faced by engineering students include 1) combining words into sentences, 2) identifying the most appropriate technical terms in engineering, and 3) applying grammar in context. To cope with those difficulties they demanded translation application machines, supported by peer-proofreaders. In addition, they considerably engaged personal tutoring with the lectures more than three times.

  6. Foreign Language/Area Studies Enhancement Project. Final Report.

    ERIC Educational Resources Information Center

    Felker, William; Fuller, Clark

    The Foreign Language/Area Studies Enhancement Program at Central State University (Ohio) is an experience-centered work and study program in Africa designed to give students training in language, culture, and technology. It parallels and supports the university's northern Senegal water management project designed to promote self-sufficiency among…

  7. Experimental projects in graduate theoretical physics courses

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rosner, J.L.

    1996-10-01

    Some beginning graduate courses in physics at the University of Chicago have been taught with final projects in addition to or in place of written final examinations. Although these courses and many of the projects are theoretical, experimental projects have been encouraged, with some success. A few examples are discussed. {copyright} {ital 1996 American Association of Physics Teachers.}

  8. 49 CFR 268.21 - Down-selection of one or more Maglev projects for further study and selection of one project for...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...

  9. 49 CFR 268.21 - Down-selection of one or more Maglev projects for further study and selection of one project for...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...

  10. 49 CFR 268.21 - Down-selection of one or more Maglev projects for further study and selection of one project for...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...

  11. 49 CFR 268.21 - Down-selection of one or more Maglev projects for further study and selection of one project for...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...

  12. 49 CFR 268.21 - Down-selection of one or more Maglev projects for further study and selection of one project for...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...

  13. Space Human Factors Engineering Gap Analysis Project Final Report

    NASA Technical Reports Server (NTRS)

    Hudy, Cynthia; Woolford, Barbara

    2006-01-01

    Humans perform critical functions throughout each phase of every space mission, beginning with the mission concept and continuing to post-mission analysis (Life Sciences Division, 1996). Space missions present humans with many challenges - the microgravity environment, relative isolation, and inherent dangers of the mission all present unique issues. As mission duration and distance from Earth increases, in-flight crew autonomy will increase along with increased complexity. As efforts for exploring the moon and Mars advance, there is a need for space human factors research and technology development to play a significant role in both on-orbit human-system interaction, as well as the development of mission requirements and needs before and after the mission. As part of the Space Human Factors Engineering (SHFE) Project within the Human Research Program (HRP), a six-month Gap Analysis Project (GAP) was funded to identify any human factors research gaps or knowledge needs. The overall aim of the project was to review the current state of human factors topic areas and requirements to determine what data, processes, or tools are needed to aid in the planning and development of future exploration missions, and also to prioritize proposals for future research and technology development.

  14. The Community Service Fellowship Planning Project: Final Report.

    ERIC Educational Resources Information Center

    McKee, Robert L.; Gaffney, Michael J.

    This report describes the findings and recommendations of the Community Service Fellowship (CSF) Planning Project conducted by the American Association of Community and Junior Colleges under a grant from ACTION, the federal agency charged with promoting volunteer service. The proposed CSF program is a means of providing young people with…

  15. College and Careers Project, 1993-96. Final Report.

    ERIC Educational Resources Information Center

    Fixman, Carol S.

    The College and Careers Project sought to increase college attendance of at-risk students in the Philadelphia public high schools and to help students link their college and career planning. Over a three-year period, 48 students from 4 high schools participated. Students took part in college preparatory and career awareness activities throughout…

  16. Project BELIEVE. Final Report. (A National Workplace Literacy Project with Bakery Europa and Straub Clinic & Hospital).

    ERIC Educational Resources Information Center

    Zane, Lawrence F. H.

    Bakery Europa and the Straub Clinic in Hawaii participated in Project BELIEVE, a 3-year (1995-98) workplace literacy project conducted in partnership with the University of Hawaii's College of Education. Instruction focused on the literacy, communication, interpersonal, and problem-solving skills needed to succeed in the baking and health care…

  17. Final Scientific/Technical Report for project “Geomechanical Monitoring for CO 2 Hub Storage: Production and Injection at Kevin Dome

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Daley, Thomas M.; Vasco, Don; Ajo-Franklin, Jonathan

    After learning that the TDS value in the target injection formation at the Kevin Dome site is too low to qualify for an EPA Class VI CO2 injection permit, the BSCSP project was re-scoped such that injection of CO2 is no longer planned. With no injection planned, the Geomechanics project was closed. In this final report, we describe the objective and approach of the project as proposed, and the limited results obtained before stopping work. The objective of the proposed research was the development & validation of an integrated monitoring approach for quantifying the interactions between large-scale geological carbon storagemore » (GCS) and subsurface geomechanical state, particularly perturbations relevant to reservoir integrity such as fault reactivation and induced fracturing. In the short period of work before knowing the fate of the Kevin Dome project, we (1) researched designs for both the proposed InSAR corner reflectors as well as the near-surface 3C seismic stations; (2) developed preliminary elastic geomechanical models; (3) developed a second generation deformation prediction for the BSCSP Kevin Dome injection site; and (4) completed a preliminary map of InSAR monuments and shallow MEQ wells in the vicinity of the BSCSP injection pad.« less

  18. Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sobecky, Patricia A; Taillefert, Martial

    This final technical report describes results and findings from a research project to examine the role of microbial phosphohydrolase enzymes in naturally occurring subsurface microorganisms for the purpose of promoting the immobilization of the radionuclide uranium through the production of insoluble uranium phosphate minerals. The research project investigated the microbial mechanisms and the physical and chemical processes promoting uranium biomineralization and sequestration in oxygenated subsurface soils. Uranium biomineralization under aerobic conditions can provide a secondary biobarrier strategy to immobilize radionuclides should the metal precipitates formed by microbial dissimilatory mechanisms remobilize due to a change in redox state.

  19. Driver Aid and Education Test Project. Final Report.

    ERIC Educational Resources Information Center

    Shadis, W.; Soucek, S. J.

    A driver education project tested the hypothesis that measurable improvements in fleet fuel economy can be achieved by driver awareness training in fuel-efficient driving techniques and by a manifold vacuum gauge, used individually or in combination with each other. From April 1976 through December 1977 data were collected in the Las Vegas,…

  20. Project ESL/Careers Curriculum. Final Report 1983-1984.

    ERIC Educational Resources Information Center

    Atlantic Community Coll., Mays Landing, NJ.

    This curriculum guide was developed at Atlantic Community College as part of a program to facilitate the training of persons with limited English-speaking ability for jobs, especially jobs in Atlantic City casinos. The project aimed to teach job skills and life coping skills along with English. The curriculum guide contains 10 units. Approximately…

  1. Vocational Curriculum Modification. Teaching Technical Language to Learning Handicapped Students. Project HIRE: A Curriculum Management System for Instructing the Handicapped. Final Report, Volume 1.

    ERIC Educational Resources Information Center

    Gardner, David C.; And Others

    Volume 1 of the final report on Project HIRE reports the design, development, field-testing, and refining of self-instructional packages to teach entry level technical vocabulary to learning handicapped students mainstreamed in vocational programs. Volume 2, a management handbook, reports the methods and findings concerning development of…

  2. Portland cement concrete pavement restoration : final summary report.

    DOT National Transportation Integrated Search

    1988-07-01

    This final summary report is comprised of an Initial Construction Report; a Final Report; and two Interim Reports. These reports document the construction of Louisiana's Portland Cement Concrete Pavement Restoration project and its performance during...

  3. Urban Options Solar Greenhouse Demonstration Project. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cipparone, L.

    1980-10-15

    The following are included: the design process, construction, thermal performance, horticulture, educational activities, and future plans. Included in appendices are: greenhouse blueprints, insulating curtain details, workshop schedules, sample data forms, summary of performance calculations on the Urban Options Solar Greenhouse, data on vegetable production, publications, news articles on th Solar Greenhouse Project, and the financial statement. (MHR)

  4. Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stinis, Panos

    2016-08-07

    This is the final report for the work conducted at the University of Minnesota (during the period 12/01/12-09/18/14) by PI Panos Stinis as part of the "Collaboratory on Mathematics for Mesoscopic Modeling of Materials" (CM4). CM4 is a multi-institution DOE-funded project whose aim is to conduct basic and applied research in the emerging field of mesoscopic modeling of materials.

  5. Selected Area Fishery Evaluation Project Economic Analysis Study Final Report, Final Draft Revision 4: November 10, 2006.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bonneville Power Administration; Washington Department of Fish and Wildlife; Oregon Department of Fish and Wildlife

    2006-11-01

    The purpose of this Study is to provide an economic review of current and proposed changes to the Select Area Fishery Evaluation Project (SAFE or Project). The Study results are the information requested in comments made on the Project by a joint review dated March 2005 by the Northwest Power and Conservation Council (NPCC) Independent Scientific Review Panel (ISRP) and Independent Economic Analysis Board (IEAB). North et al. (2006) addressed technical questions about operations and plans, and this report contains the response information for comments concerning Project economics. This report can be considered an economic feasibility review meeting guidelines formore » cost-effective analysis developed by the IEAB (2003). It also contains other economic measurement descriptions to illustrate the economic effects of SAFE. The SAFE is an expansion of a hatchery project (locally called the Clatsop Economic Development Council Fisheries Project or CEDC) started in 1977 that released an early run coho (COH) stock into the Youngs River. The Youngs River entrance to the Columbia River at River Mile 12 is called Youngs Bay, which is located near Astoria, Oregon. The purpose of the hatchery project was to provide increased fishing opportunities for the in-river commercial fishing gillnet fleet. Instead of just releasing fish at the hatchery, a small scale net pen acclimation project in Youngs Bay was tried in 1987. Hirose et al. (1998) found that 1991-1992 COH broodstock over-wintered at the net pens had double the smolt-to-adult return rate (SAR) of traditional hatchery release, less than one percent stray rates, and 99 percent fishery harvests. It was surmised that smolts from other Columbia River hatcheries could be hauled to the net pens for acclimation and release to take advantage of the SAR's and fishing rates. Proposals were tendered to Bonneville Power Administration (BPA) and other agencies to fund the expansion for using other hatcheries smolts and other off

  6. Columbia Basin Wildlife Mitigation Project : Rainwater Wildlife Area Final Management Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Childs, Allen

    This Draft Management Plan has been developed by the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to document how the Rainwater Wildlife Area (formerly known as the Rainwater Ranch) will be managed. The plan has been developed under a standardized planning process developed by the Bonneville Power Administration (BPA) for Columbia River Basin Wildlife Mitigation Projects (See Appendix A and Guiding Policies Section below). The plan outlines the framework for managing the project area, provides an assessment of existing conditions and key resource issues, and presents an array of habitat management and enhancement strategies. The plan culminates into amore » 5-Year Action Plan that will focus our management actions and prioritize funding during the Fiscal 2001-2005 planning period. This plan is a product of nearly two years of field studies and research, public scoping, and coordination with the Rainwater Advisory Committee. The committee consists of representatives from tribal government, state agencies, local government, public organizations, and members of the public. The plan is organized into several sections with Chapter 1 providing introductory information such as project location, purpose and need, project goals and objectives, common elements and assumptions, coordination efforts and public scoping, and historical information about the project area. Key issues are presented in Chapter 2 and Chapter 3 discusses existing resource conditions within the wildlife area. Chapter 4 provides a detailed presentation on management activities and Chapter 5 outlines a monitoring and evaluation plan for the project that will help assess whether the project is meeting the intended purpose and need and the goals and objectives. Chapter 6 displays the action plan and provides a prioritized list of actions with associated budget for the next five year period. Successive chapters contain appendices, references, definitions, and a glossary.« less

  7. A Study of Job Demands and Curriculum Development in Agricultural Training Related to the Muskegon County Wastewater Management System. Final Report. Volume I. An Overview of the Research Project.

    ERIC Educational Resources Information Center

    Fisher, Harold S.; And Others

    This volume is one of a four-volume final report of a research project developed to identify the jobs and training needs for the area of wastewater land treatment systems and related agricultural occupations. The overall purpose of the project is presented in terms of its six subobjectives: (1) To identify the agricultural occupations related to…

  8. Saudi Arabian seismic deep-refraction profiles; final project report

    USGS Publications Warehouse

    Healy, J.H.; Mooney, W.D.; Blank, H.R.; Gettings, M.E.; Kohler, W.M.; Lamson, R.J.; Leone, L.E.

    1983-01-01

    In February 1978 a seismic deep-refraction profile was recorded by the U.S. Geological Survey along a 1000-km line across the Arabian Shield in western Saudi Arabia. The line begins in Mesozoic cover rocks near Riyadh on the Arabian Platform, leads southwesterly across three major Precambrian tectonic provinces, traverses Cenozoic rocks of the coastal plain near Jizan (Tihamat-Asir), and terminates at the outer edge of the Farasan Bank in the southern Red Sea. More than 500 surveyed recording sites were occupied, including 19 in the Farasan Islands. Six shot points were used: five on land, with most charges placed below the water table in drill holes, and one at sea, with charges placed on the sea floor and detonated from a ship. Slightly more than 61 metric tons of explosives were used in 19 discrete firings. Seismic energy was recorded by 100 newly-developed portable seismic stations deployed in approximately 200 km-long arrays for each firing. Each station consisted of a standard 2-Hz vertical component geophone coupled to a self-contained analog recording instrument equipped with a magnetic-tape cassette. In this final report, we fully document the field and data-processing procedures and present the final seismogram data set as both a digital magnetic tape and as record sections for each shot point. Record sections include a normalized set of seismograms, reduced at 6 km/s, and a true-amplitude set, reduced at 8 km/s, which have been adjusted for amplifier gain, individual shot size, and distance from the shot point. Appendices give recorder station and shot information, digital data set descriptions, computer program listings, arrival times used in the interpretation, and a bibliography of reports published as a result of this project. We used two-dimensional ray-tracing techniques in the data analysis, and our interpretation is based primarily on horizontally layered models. The Arabian Shield is composed, to first-order, of two layers, each about 20 km

  9. Florida's wet weather demonstration project : final report, January 2009.

    DOT National Transportation Integrated Search

    2008-11-01

    The Florida Department of Transportation (FDOT) established a wet-weather pavement marking demonstration project with goals to gather performance data, evaluate various wet-weather marking systems, and develop a measurement protocol for measuring ret...

  10. Final waste forms project: Performance criteria for phase I treatability studies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gilliam, T.M.; Hutchins, D.A.; Chodak, P. III

    1994-06-01

    This document defines the product performance criteria to be used in Phase I of the Final Waste Forms Project. In Phase I, treatability studies will be performed to provide {open_quotes}proof-of-principle{close_quotes} data to establish the viability of stabilization/solidification (S/S) technologies. This information is required by March 1995. In Phase II, further treatability studies, some at the pilot scale, will be performed to provide sufficient data to allow treatment alternatives identified in Phase I to be more fully developed and evaluated, as well as to reduce performance uncertainties for those methods chosen to treat a specific waste. Three main factors influence themore » development and selection of an optimum waste form formulation and hence affect selection of performance criteria. These factors are regulatory, process-specific, and site-specific waste form standards or requirements. Clearly, the optimum waste form formulation will require consideration of performance criteria constraints from each of the three categories. Phase I will focus only on the regulatory criteria. These criteria may be considered the minimum criteria for an acceptable waste form. In other words, a S/S technology is considered viable only if it meet applicable regulatory criteria. The criteria to be utilized in the Phase I treatability studies were primarily taken from Environmental Protection Agency regulations addressed in 40 CFR 260 through 265 and 268; and Nuclear Regulatory Commission regulations addressed in 10 CFR 61. Thus the majority of the identified criteria are independent of waste form matrix composition (i.e., applicable to cement, glass, organic binders etc.).« less

  11. Final report : Dallas Integrated Corridor Management (ICM) Demonstration Project.

    DOT National Transportation Integrated Search

    2015-08-01

    The Dallas Area Rapid Transit (DART) is leading the US-75 Integrated Corridor Management (ICM) Demonstration Project for the Dallas region. Coordinated corridor operations and management is predicated on being able to share transportation information...

  12. The ATLAS project: The effects of a constructionist digital laboratory project on undergraduate laboratory performance.

    PubMed

    Shoepe, Todd C; Cavedon, Dana K; Derian, Joseph M; Levy, Celine S; Morales, Amy

    2015-01-01

    Anatomical education is a dynamic field where developments in the implementation of constructive, situated-learning show promise in improving student achievement. The purpose of this study was to examine the effectiveness of an individualized, technology heavy project in promoting student performance in a combined anatomy and physiology laboratory course. Mixed-methods research was used to compare two cohorts of anatomy laboratories separated by the adoption of a new laboratory atlas project, which were defined as preceding (PRE) and following the adoption of the Anatomical Teaching and Learning Assessment Study (ATLAS; POST). The ATLAS project required the creation of a student-generated, photographic atlas via acquisition of specimen images taken with tablet technology and digital microscope cameras throughout the semester. Images were transferred to laptops, digitally labeled and photo edited weekly, and compiled into a digital book using Internet publishing freeware for final project submission. An analysis of covariance confirmed that student final examination scores were improved (P < 0.05) following the implementation of the laboratory atlas project (PRE, n = 75; POST, n = 90; means ± SE; 74.9 ± 0.9 versus 78.1 ± 0.8, respectively) after controlling for cumulative student grade point average. Analysis of questionnaires collected (n = 68) from the post group suggested students identified with atlas objectives, appreciated the comprehensive value in final examination preparation, and the constructionism involved, but recommended alterations in assignment logistics and the format of the final version. Constructionist, comprehensive term-projects utilizing student-preferred technologies could be used to improve performance toward student learning outcomes. © 2014 American Association of Anatomists.

  13. Lane Transit District "Curb Your Car" project : final report.

    DOT National Transportation Integrated Search

    2001-03-01

    Lane Transit District has been active in utilizing transportation demand management techniques to encourage use of alternatives to the single occupant vehicle. In 1993, a Curb Your Car project indicated that participating employees use of al...

  14. Lane Transit District "Curb Your Car" Project : final report

    DOT National Transportation Integrated Search

    2001-03-01

    Lane Transit District has been active in utilizing transportation demand management techniques to encourage use of alternatives to the single occupant vehicle. In 1993, a Curb Your Car project indicated that participating employees' use of alternativ...

  15. Smart roadside initiative : final report.

    DOT National Transportation Integrated Search

    2015-09-01

    This is the Final Report for the Smart Roadside Initiative (SRI) prototype system deployment project. The SRI prototype was implemented at weigh stations in Grass Lake, Michigan and West Friendship, Maryland. The prototype was developed to integrate ...

  16. Coordinated Fault-Tolerance for High-Performance Computing Final Project Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Panda, Dhabaleswar Kumar; Beckman, Pete

    2011-07-28

    With the Coordinated Infrastructure for Fault Tolerance Systems (CIFTS, as the original project came to be called) project, our aim has been to understand and tackle the following broad research questions, the answers to which will help the HEC community analyze and shape the direction of research in the field of fault tolerance and resiliency on future high-end leadership systems. Will availability of global fault information, obtained by fault information exchange between the different HEC software on a system, allow individual system software to better detect, diagnose, and adaptively respond to faults? If fault-awareness is raised throughout the system throughmore » fault information exchange, is it possible to get all system software working together to provide a more comprehensive end-to-end fault management on the system? What are the missing fault-tolerance features that widely used HEC system software lacks today that would inhibit such software from taking advantage of systemwide global fault information? What are the practical limitations of a systemwide approach for end-to-end fault management based on fault awareness and coordination? What mechanisms, tools, and technologies are needed to bring about fault awareness and coordination of responses on a leadership-class system? What standards, outreach, and community interaction are needed for adoption of the concept of fault awareness and coordination for fault management on future systems? Keeping our overall objectives in mind, the CIFTS team has taken a parallel fourfold approach. Our central goal was to design and implement a light-weight, scalable infrastructure with a simple, standardized interface to allow communication of fault-related information through the system and facilitate coordinated responses. This work led to the development of the Fault Tolerance Backplane (FTB) publish-subscribe API specification, together with a reference implementation and several experimental implementations on

  17. A Project to Computerize Performance Objectives and Criterion-Referenced Measures in Occupational Education for Research and Determination of Applicability to Handicapped Learners. Final Report.

    ERIC Educational Resources Information Center

    Lee, Connie W.; Hinson, Tony M.

    This publication is the final report of a 21-month project designed to (1) expand and refine the computer capabilities of the Vocational-Technical Education Consortium of States (V-TECS) to ensure rapid data access for generating routine and special occupational data-based reports; (2) develop and implement a computer storage and retrieval system…

  18. Project T.E.A.M. (Technical Education Advancement Modules). Final Report.

    ERIC Educational Resources Information Center

    Greenville Technical Coll., SC.

    Project TEAM (Technical Education Advancement Modules), a cooperative demonstration program for high technology training, created an introductory technical training program and a consumer education package emphasizing the benefits of technical training. The curriculum and training focus of the project began with an assessment of employee needs in…

  19. Side Streets: A Local History Project for Colorado Teachers. Final Performance Report.

    ERIC Educational Resources Information Center

    Downey, Matthew T.; Metcalf, Fay D.

    This description of a project to help secondary school social studies classroom teachers incorporate local history into the curriculum focuses on objectives, project development and activities, and outcome data. The specific intent of this project was to help classroom teachers in Colorado overcome some of the obstacles to the use of local history…

  20. Compost-powered food drying project. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1983-01-01

    Results of a study performed to demonstrate the use of heat generated from compost piles to dry food are presented. Results indicate that compost pile heat, the main source of heat for the dryer, performed rather erratically in past trials, but its positive effects on the environment merit more study. The increase in nitrogen fertilizer value of finished compost over the original materials ranged between 25% and 90%. This replaces nitrogen usually made with fossil fuels, without generating any known toxic effects on the surrounding environment. Bacteria are very efficient workers that can be harnessed to do certain tasks. Heatingmore » and producing nitrogen would be using the same bacteria to do two jobs efficiently. When too much heat is extracted from a pile, the bacteria cannot function efficiently and the pile cools down. Therefore there is only a limited amount of heat available for outside uses. This amount of heat is felt to be proportionate to pile size, so a larger pile could meet the heating demands of the dryer used in the project. Operator expertise is very critical in composting for heat and is effectively gained only through experience. Since the cost effectiveness of the operation depends on using waste materials available at the site, the operator must find the correct combination of these materials and combine them correctly. The length of time involved in fully composting materials and the seasonal limitations of the method combine to bring expertise to the operator only after years of composting. A positive side effect of the project has been the realization of the usefulness of the pre-made insulated box (used refrigerator truck body) in temperature controlled situations. It has proved to be a very cost effective and portable dryer.« less

  1. Yakima Fisheries Project : Final Environmental Impact Statement.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Washington; Confederated Tribes and Bands of the Yakama Nation, Washington.

    1996-01-01

    BPA proposes to fund several fishery-related activities in the Yakima River Basin. These activities, known as the Yakima Fisheries Project (YFP), would be jointly managed by the State of Washington and the Yakima Indian Nation. The YFP is included in the Northwest Power Planning Council`s (Council`s) fish and wildlife program. The Council selected the Yakima River system for attention because fisheries resources are severely reduced from historical levels and because there is a significant potential for enhancement of these resources. BPA`s proposed action is to fund (1) information gathering on the implementation of supplementation techniques and on feasibility of reintroducingmore » coho salmon in an environment where native populations have become extinct; (2) research activities based on continuous assessment, feedback and improvement of research design and activities ({open_quotes}adaptive management{close_quotes}); and (3) die construction, operation, and maintenance of facilities for supplementing populations of upper Yakima spring chinook salmon. Examined in addition to No Action are two alternatives for action: (1) supplementation of depressed natural populations of upper Yakima spring chinook and (2) that same supplementation plus a study to determine the feasibility of reestablishing naturally spawning population and a significant fall fishery for coho in the Yakima Basin. Alternative 2 is the preferred action. A central hatchery would be built for either alternative, as well as three sites with six raceways each for acclimation and release of spring chinook smolts. Major issues examined in the Revised Draft EIS include potential impacts of the project on genetic and ecological resources of existing fish populations, on water quality and quantity, on threatened and endangered species listed under the Endangered Species Act, and on the recreational fishery.« less

  2. Effective Transition (Project E.T.) Final Evaluation Report, 1992-93. OER Report.

    ERIC Educational Resources Information Center

    Musante, Patricia

    This report presents an evaluation of the Effective Transition (ET) project, an Elementary and Secondary Education Act Title VII-funded project in its second year of operation at Lafayette High School and Pershing Intermediate School in Brooklyn, New York. The project served a total of 300 students of limited English proficiency who were native…

  3. Combined Final Report for Colony II Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kale, Laxmikant; Jones, Terry; Moreira, Jose

    2013-10-23

    (This report was originally submmited by the lead PI (Terry Jones, ORNL) on October 22, 2013 to the program manager, Lucy Nowell. It is being submitted from University of Illinois in accordance with instructions). HPC Colony II seeks to provide portable performance for leadership class machines. Our strategy is based on adaptive system software that aims to make the intelligent decisions necessary to allow domain scientists to safely focus on their task at hand and allow the system software stack to adapt their application to the underlying architecture. This report describes the research undertaken towards these objectives and the resultsmore » obtained over the performance period of the project.« less

  4. Gray's Ferry project: Phase II. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    A three-story rowhouse building was retrofitted to demonstrate solar heating and energy conservation in the Philadelphia, PA area. The retrofit included a solar greenhouse, a Trombe wall, and a solar hot water system. The Phase II Project funding was used for four specific endeavors: (1) tours; (2) brochures/literature; (3) a slide show presentation; and (4) signage showing the design of the active and passive solar systems. Three special workshops and more than fifteen tours of the building were given. A DOE funded study showed that a Trombe wall was the most cost-effective solar application for the 183,000 two-story brick rowmore » houses in the city. (BCS)« less

  5. "2+2" Articulated Health Occupations Project. Nursing Program. Second Year Final Report.

    ERIC Educational Resources Information Center

    Paris Independent School District, TX.

    A project was conducted to develop a 2 + 2 articulated training program in health careers to link the last 2 years of secondary and the first 2 years of postsecondary training. During the second year of the secondary project, the first year of training was implemented and the model program was further developed and refined. Project tasks included…

  6. Project C.O.P.S. Phase I, 1981-82. Final Report.

    ERIC Educational Resources Information Center

    Middlesex County Coll., Edison, NJ.

    A program entitled Project COPS (Career Oriented Peer Tutoring System) is a comprehensive peer tutoring and advisement approach that was undertaken to improve student retention at Middlesex County College in Edison, New Jersey. The principal goal of the project was to reach potentially unsuccessful entering freshmen students and to offer them…

  7. KSC History Project

    NASA Technical Reports Server (NTRS)

    Snaples, Lee

    2001-01-01

    The project is a joint endeavor between Dr. Henry Dethloff and myself and is producing a number of products related to KSC history. This report is a summary of those projects. First, there is an overview monograph covering KSC history. Second, there is a chapter outline for an eventual book-length history. Third, there is monograph on safety at KSC. Finally, there is a web page and database dedicated to the KSC oral history project.

  8. WSF Biodiesel Demonstration Project Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Washington State University; University of Idaho; The Glosten Associates, Inc.

    2009-04-30

    In 2004, WSF canceled a biodiesel fuel test because of “product quality issues” that caused the fuel purifiers to clog. The cancelation of this test and the poor results negatively impacted the use of biodiesel in marine application in the Pacific Northwest. In 2006, The U.S. Department of Energy awarded the Puget Sound Clean Air Agency a grant to manage a scientific study investigating appropriate fuel specifications for biodiesel, fuel handling procedures and to conduct a fuel test using biodiesel fuels in WSF operations. The Agency put together a project team comprised of experts in fields of biodiesel research andmore » analysis, biodiesel production, marine engineering and WSF personnel. The team reviewed biodiesel technical papers, reviewed the 2004 fuel test results, designed a fuel test plan and provided technical assistance during the test. The research reviewed the available information on the 2004 fuel test and conducted mock laboratory experiments, but was not able to determine why the fuel filters clogged. The team then conducted a literature review and designed a fuel test plan. The team implemented a controlled introduction of biodiesel fuels to the test vessels while monitoring the environmental conditions on the vessels and checking fuel quality throughout the fuel distribution system. The fuel test was conducted on the same three vessels that participated in the canceled 2004 test using the same ferry routes. Each vessel used biodiesel produced from a different feedstock (i.e. soy, canola and yellow grease). The vessels all ran on ultra low sulfur diesel blended with biodiesel. The percentage of biodiesel was incrementally raised form from 5 to 20 percent. Once the vessels reached the 20 percent level, they continued at this blend ratio for the remainder of the test. Fuel samples were taken from the fuel manufacturer, during fueling operations and at several points onboard each vessel. WSF Engineers monitored the performance of the fuel

  9. SELENIUM TREATMENT/REMOVAL ALTERNATIVES DEMONSTRATION PROJECT - MINE WASTE TECHNOLOGY PROGRAM ACTIVITY III, PROJECT 20

    EPA Science Inventory

    This document is the final report for EPA's Mine WAste Technology Program (MWTP) Activity III, Project 20--Selenium Treatment/Removal Alternatives Demonstration project. Selenium contamination originates from many sources including mining operations, mineral processing, abandoned...

  10. Promoting Effective Transition for Severely Handicapped Youth from School to Work through Training, Intervention, Support and Advocacy. Year 3 and Final Evaluation Report: Project COMPETE, October 1, 1984-September 30, 1987.

    ERIC Educational Resources Information Center

    Gittman, Elizabeth

    The final report describes the objectives and accomplishments of Project COMPETE, a 3-year project in New York State whose purpose was to develop secondary and transitional postsecondary programming for training youth with severe disabilities in skills necessary to achieve a successful transition from school to vocational opportunities in their…

  11. Project L'Ouverture, 1981-1982. O.E.E. Final Evaluation Report.

    ERIC Educational Resources Information Center

    Keane, Demetra Nicolau; And Others

    Originally proposed as a supplement to basic bilingual programs for Haitian students in three New York City high schools, Project L'Ouverture changed its focus to the development and reinforcement of basic skills. In response to a need for basic bilingual services not available in participating schools, the project provided tutorial services to…

  12. Buddy-Tutor Project. Hilo Intermediate School. Final Report, March-July, 1974.

    ERIC Educational Resources Information Center

    Hawaii Univ., Honolulu. Social Welfare Development and Research Center.

    An operational description of the 1973-74 Buddy-Tutor Project at Hilo Intermediate School in Hilo, Hawaii and an evaluative assessment of its outcome with statistical treatment of the data is provided in this report. This project is an exploratory behavioral intervention program for educationally deprived students and focuses its efforts on the…

  13. Fulbright-Hays Seminars Abroad Program 1992: Morocco and Tunisia. Final Projects.

    ERIC Educational Resources Information Center

    AMIDEAST, Washington, DC.

    The projects described in this document were submitted by U.S. teachers who spent time in Morocco and Tunisia as part of the 1992 Fulbright-Hays Seminars Abroad Program. The following are among the titles of the projects included: "Formal Education in Rural Morocco: Problems and Constraints" (Victoria Baker); "Continuity and Change…

  14. 76 FR 64085 - Post-2014 Resource Pool-Loveland Area Projects, Final Power Allocation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ... power allocation. SUMMARY: The Western Area Power Administration (Western), a Federal power marketing..., Final Power Allocation developed under the requirements of subpart C-Power Marketing Initiative of the Energy Planning and Management Program (Program) Final Rule, 10 CFR part 905. These final power...

  15. Integrated System Health Management (ISHM) Technology Demonstration Project Final Report

    NASA Technical Reports Server (NTRS)

    Mackey, Ryan; Iverson, David; Pisanich, Greg; Toberman, Mike; Hicks, Ken

    2006-01-01

    Integrated System Health Management (ISHM) is an essential capability that will be required to enable upcoming explorations mission systems such as the Crew Exploration Vehicle (CEV) and Crew Launch Vehicle (CLV), as well as NASA aeronautics missions. However, the lack of flight experience and available test platforms have held back the infusion by NASA Ames Research Center (ARC) and the Jet Propulsion Laboratory (JPL) of ISHM technologies into future space and aeronautical missions. To address this problem, a pioneer project was conceived to use a high-performance aircraft as a low-cost proxy to develop, mature, and verify the effectiveness of candidate ISHM technologies. Given the similarities between spacecraft and aircraft, an F/A-18 currently stationed at Dryden Flight Research Center (DFRC) was chosen as a suitable host platform for the test bed. This report describes how the test bed was conceived, how the technologies were integrated on to the aircraft, and how these technologies were matured during the project. It also describes the lessons learned during the project and a forward path for continued work.

  16. SmartPark Technology Demonstration Project, Phase II: Final Report

    DOT National Transportation Integrated Search

    2018-05-01

    The purpose of FMCSA's SmartPark project was to determine the feasibility of a technology for providing truck parking space availability information in real time to truckers on the road. SmartPark consisted of two phases. Phase I was a field operatio...

  17. Secretary's Discretionary Program: Planning Grant To Develop Teacher Incentive Projects. Final Report. Support for Innovative Teacher Projects.

    ERIC Educational Resources Information Center

    Gittman, Elizabeth; Gottlieb, Karen

    Support for Innovative Teacher Projects was a 12-month program implemented by the Board of Cooperative Education Services (BOCES) of Nassau County, New York, designed to encourage and assist teachers in developing innovative projects in priority areas and in applying for funding. In collaboration with a university school of education, the project…

  18. Messiah College Biodiesel Fuel Generation Project Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zummo, Michael M; Munson, J; Derr, A

    Many obvious and significant concerns arise when considering the concept of small-scale biodiesel production. Does the fuel produced meet the stringent requirements set by the commercial biodiesel industry? Is the process safe? How are small-scale producers collecting and transporting waste vegetable oil? How is waste from the biodiesel production process handled by small-scale producers? These concerns and many others were the focus of the research preformed in the Messiah College Biodiesel Fuel Generation project over the last three years. This project was a unique research program in which undergraduate engineering students at Messiah College set out to research the feasibilitymore » of small-biodiesel production for application on a campus of approximately 3000 students. This Department of Energy (DOE) funded research program developed out of almost a decade of small-scale biodiesel research and development work performed by students at Messiah College. Over the course of the last three years the research team focused on four key areas related to small-scale biodiesel production: Quality Testing and Assurance, Process and Processor Research, Process and Processor Development, and Community Education. The objectives for the Messiah College Biodiesel Fuel Generation Project included the following: 1. Preparing a laboratory facility for the development and optimization of processors and processes, ASTM quality assurance, and performance testing of biodiesel fuels. 2. Developing scalable processor and process designs suitable for ASTM certifiable small-scale biodiesel production, with the goals of cost reduction and increased quality. 3. Conduct research into biodiesel process improvement and cost optimization using various biodiesel feedstocks and production ingredients.« less

  19. Revenue and Expenditure Projections for the Albuquerque Public Schools. Final Report.

    ERIC Educational Resources Information Center

    Pleyte, Parrie S.; Kohl, Bruce R.

    This report is part of a 10-city national study of revenues and expenditures shared by a local government. The purpose of the study is to project operating revenues and expenditures of the Albuquerque public schools through 1975. The revenue projection includes all sources and uses various methods for estimating Federal, State, and local revenue.…

  20. Hospitality Occupational Skills Training Cooperative. Project HOST Final Report.

    ERIC Educational Resources Information Center

    Northwest Educational Cooperative, Des Plaines, IL.

    Project HOST (Hospitality Occupational Skills Training) provided vocational training and employment opportunities in the hotel industry to disadvantaged adult minority populations in Chicago. It demonstrated a model for successful cooperation between the business sector and a public vocational education agency and developed and piloted a…

  1. Instructional Systems Development Model for Interactive Videodisc. Final Report.

    ERIC Educational Resources Information Center

    Campbell, J. Olin; And Others

    This third and final report on a 3-year project, which developed authoring and production procedures for interactive videodisc based on the Interservice Procedures for Instructional Systems Development (IPISD), reviews the current state of the art, provides an overview of the project, and describes two videodiscs made for the project and the…

  2. 23 CFR 140.609 - Progress and final vouchers.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Progress and final vouchers. 140.609 Section 140.609 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for Bond Issue Projects § 140.609 Progress and final vouchers. (a) Progress vouchers may be...

  3. 23 CFR 140.609 - Progress and final vouchers.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Progress and final vouchers. 140.609 Section 140.609 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for Bond Issue Projects § 140.609 Progress and final vouchers. (a) Progress vouchers may be...

  4. 23 CFR 140.609 - Progress and final vouchers.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Progress and final vouchers. 140.609 Section 140.609 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for Bond Issue Projects § 140.609 Progress and final vouchers. (a) Progress vouchers may be...

  5. 23 CFR 140.609 - Progress and final vouchers.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Progress and final vouchers. 140.609 Section 140.609 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PAYMENT PROCEDURES REIMBURSEMENT Reimbursement for Bond Issue Projects § 140.609 Progress and final vouchers. (a) Progress vouchers may be...

  6. 75 FR 19670 - Marine Highway Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-15

    ... DEPARTMENT OF TRANSPORTATION Maritime Administration Marine Highway Projects ACTION: Solicitation of applications for Marine highway projects. SUMMARY: The Department of Transportation is soliciting applications for Marine Highway Projects as specified in the America's Marine Highway Program Final Rule, MARAD...

  7. Industrial Technology Modernization Program. Project 28. Automation of Receiving, Receiving Inspection and Stores

    DTIC Science & Technology

    1987-06-15

    001 GENERAL DYNAMICS 00 FORT WORTH DIVISION INDUSTRIAL TECHNOLOGY MODERNIZATION PROGRAM Phase 2 Final Project Repc t JUNG 0 ?7 PROJECT 28 AUTOMATION...DYNAMICS FORT WORTH DIVISION INDUSTRIAL TECHNOLOGY MODERNIZATION PROGRAM Phase 2 Final Project Report PROJECT 28 AUTOMATION OF RECEIVING, RECEIVING...13 6 PROJECT ASSUMPTIONS 20 7 PRELIMINARY/FINAL DESIGN AND FINDINGS 21 8 SYSTEM/EQUIPMENT/MACHINING SPECIFICATIONS 37 9 VENDOR/ INDUSTRY ANALYSIS

  8. Final Report of the Vocational Assessment Project, 1979-80.

    ERIC Educational Resources Information Center

    Rutgers, The State Univ., New Brunswick, NJ. School of Medicine.

    To improve vocational rehabilitation programs for schizophrenic persons, a project sought to design an effective assessment strategy. Inactive records of schizophrenic clients at New Jersey sheltered workshops were examined to determine validity and reliability of assessment instruments being used. General Aptitude Test Battery (GATB) profiles of…

  9. Adult Basic Education Outreach Project. Final Report (Executive Summary).

    ERIC Educational Resources Information Center

    Alberta Vocational Centre, Edmonton.

    An executive report summarizes the Alberta Vocational Centre's development of a portable individualized, competency-based learning system for use in an adult basic education program in a non-institutional community location. The report deals with the project's rationale, development (including management, curricular development, budget, and site…

  10. Projecting Labor Requirements for Transportation-Related Construction. Final Report.

    ERIC Educational Resources Information Center

    Washington Technical Inst., Washington, DC. Center for Urban Services.

    This report examines the urban transportation planning process and its labor market impact, including projections of opportunities for minority participation in construction, operation, and maintenance of a transportation system and forecasts of training needed in critical occupations. It was found that transportation-related construction may be…

  11. Advanced exterior sensor project : final report, September 2004.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ashby, M. Rodema

    2004-12-01

    This report (1) summarizes the overall design of the Advanced Exterior Sensor (AES) system to include detailed descriptions of system components, (2) describes the work accomplished throughout FY04 to evaluate the current health of the original prototype and to return it to operation, (3) describes the status of the AES and the AES project as of September 2004, and (4) details activities planned to complete modernization of the system to include development and testing of the second-generation AES prototype.

  12. Final Determination - signed August 31, 2008

    EPA Pesticide Factsheets

    Final Determination of the U.S. EPA’s Assistant Administrator for Water pursuant to Section 404(c) of the Clean Water Act concerning the proposed Yazoo Backwater area pumps project, Issaquena county, Mississippi.

  13. MED-SUV final strategic issues

    NASA Astrophysics Data System (ADS)

    Spampinato, Letizia; Puglisi, Giuseppe; Sangianantoni, Agata

    2016-04-01

    Aside the scientific, technical and financial aspects managed by the "Project Management" Work Package (WP1), the great challenge and more time consuming task of this WP has surely been the definition and application of some strategic guidelines crucial to trace the project right path to its final success and for the project outcome sustainability after month 36. In particular, given that one of the main objectives of MED-SUV is that to be compliant with the GEO initiative, particularly concerning the data sharing, great efforts have been made by WP1 at first to define the MED-SUV Data Policy Guidelines, and currently to make it suitable for the EU Supersites. At present, WP1 is also dealing with the exploitation of the achieved foreground among the project's participant and to define a Memorandum of Understanding to sustain the monitoring systems and e-infrastructure developed in the project framework. Whilst the Data Policy guidelines document was implemented in the first year of MED-SUV, WP1 is now focused on the last deliverable 'Strategic and Legal deliverables', which includes the remaining issues. To the aim, WP1 has strategically separated the Exploitation of Foreground document preparation from the Memorandum of Understanding definition. The Exploitation of Foreground process has regarded the identification of Foreground, the exploitable results, the purpose of such Foreground, the collection of information from either the scientific community of MED-SUV or industrial participants; to this aim WP1 circulated an ad hoc questionnaire to put together information on (the) every kind of MED-SUV outcome, on their owners, on the kind of ownership (single/joint), on the outcome exploitation, and on proposals for its sustainability. While the first information will allow us to prepare the final Exploitation Agreement among the project's participant, the information on the exploitation of the outcome and likely sustainability proposals will contribute to the

  14. Final report: Compiled MPI. Cost-Effective Exascale Application Development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gropp, William Douglas

    2015-12-21

    This is the final report on Compiled MPI: Cost-Effective Exascale Application Development, and summarizes the results under this project. The project investigated runtime enviroments that improve the performance of MPI (Message-Passing Interface) programs; work at Illinois in the last period of this project looked at optimizing data access optimizations expressed with MPI datatypes.

  15. Final Technical Report for Years 1-4 of the Early Career Research Project "Viscosity and equation of state of hot and dense QCD matter" - ARRA portion

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Molnar, Denes

    2014-04-14

    The Section below summarizes research activities and achievements during the first four years of the PI’s Early Career Research Project (ECRP). Two main areas have been advanced: i) radiative 3 ↔ 2 radiative transport, via development of a new computer code MPC/Grid that solves the Boltzmann transport equation in full 6+1D (3X+3V+time) on both single-CPU and parallel computers; ii) development of a self-consistent framework to convert viscous fluids to particles, and application of this framework to relativistic heavy-ion collisions, in particular, determination of the shear viscosity. Year 5 of the ECRP is under a separate award number, and therefore itmore » has its own report document ’Final Technical Report for Year 5 of the Early Career Research Project “Viscosity and equation of state of hot and dense QCDmatter”’ (award DE-SC0008028). The PI’s group was also part of the DOE JET Topical Collaboration, a multi-institution project that overlapped in time significantly with the ECRP. Purdue achievements as part of the JET Topical Collaboration are in a separate report “Final Technical Report summarizing Purdue research activities as part of the DOE JET Topical Collaboration” (award DE-SC0004077).« less

  16. Skills Conversion Project, Chapter 8, Pollution Control. Final Report.

    ERIC Educational Resources Information Center

    National Society of Professional Engineers, Washington, DC.

    The Skills Conversion Project conducted by the National Society of Professional Engineers sought to study the transition mechanisms required to transfer available technical manpower from aerospace and defense industries into other areas of employment in private industry and public service. Fourteen study teams assessed the likelihood of future…

  17. Evaluation of the Attendant Care Pilot Project. Final Report.

    ERIC Educational Resources Information Center

    Clark, Anne; Faragher, Jean

    An Attendant Care Pilot Project, administered by the Home Care Service of New South Wales, Australia, and providing attendant care for 24 permanently severely physically disabled adults for 2 years, was evaluated. The patients were medically stable and intellectually capable of managing their own affairs; all had impairments which required…

  18. Final Evaluation for the Neighborhood Educational Cultural Centerette.

    ERIC Educational Resources Information Center

    Frost, Patricia

    Contained in this report is the final evaluation for the Neighborhood Educational Cultural Centerette Project. Objectives of the research project were to: (1) investigate, experiment with, create, and evaluate methods of instruction curriculum, and materials; analyze pupil learning styles and teacher-teaching styles; and to provide staff growth…

  19. Michigan Physicians' Conference on Elder Abuse. Final Report.

    ERIC Educational Resources Information Center

    Sengstock, Mary C.; O'Brien, James G.

    The final report describes the Michigan Physicians' Conference on Elder Abuse project. The project conference had four major content areas, including: a general introduction to the problem of elder abuse; clinical symptoms of abuse; legal issues; and referral and case management techniques. Training techniques included lectures, group discussion,…

  20. Wildlife and Wildlife Habitat Mitigation Plan for Hungry Horse Hydroelectric Project, Final Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bissell, Gael

    1985-01-01

    This report describes the proposed mitigation plan for wildlife losses attributable to the construction of the Hungry Horse hydroelectric project. In this report, mitigation objectives and alternatives, the recommended mitigation projects, and the crediting system for each project are described by each target species. Mitigation objectives for each species (group) were established based on the loss estimates but tailored to the recommended projects. 13 refs., 3 figs., 19 tabs.

  1. Design-Build Highway Projects : A Review of Practices and Experiences, Final Report.

    DOT National Transportation Integrated Search

    2016-11-01

    Texas has employed different project delivery methods in recent years in an effort to add capacity, reduce congestion, and improve the effectiveness and efficiency of the states transportation system. These transportation improvement projects are ...

  2. Learning and Optimization of Cognitive Capabilities. Final Project Report.

    ERIC Educational Resources Information Center

    Lumsdaine, A.A.; And Others

    The work of a three-year series of experimental studies of human cognition is summarized in this report. Proglem solving and learning in man-machine interaction was investigated, as well as relevant variables and processes. The work included four separate projects: (1) computer-aided problem solving, (2) computer-aided instruction techniques, (3)…

  3. Skills Conversion Project: Chapter 7, Power Resources. Final Report.

    ERIC Educational Resources Information Center

    National Society of Professional Engineers, Washington, DC.

    The opportunity for employment of displaced aerospace and defense professionals within the electric power utility industry was investigated by the Seattle Skills Conversion Project Team of the National Society of Professional Engineers, as part of a study conducted for the U.S. Department of Labor. The study concluded that a possibility for…

  4. Collaborative Project on Serving Linguistically Diverse Seniors. Final Report.

    ERIC Educational Resources Information Center

    Burt, Miriam

    In 2002, the Center for Applied Linguistics (CAL) collaborated with the Senior Service Association (SSA) and the American Society on Aging (ASA) on a two-phase project to improve the effectiveness of ASA's sub-grantees in serving linguistically and culturally diverse populations. SSA provides subsidized employment for low-income seniors and funds…

  5. Final Technical Report for Collaborative Research: Regional climate-change projections through next-generation empirical and dynamical models, DE-FG02-07ER64429

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smyth, Padhraic

    2013-07-22

    This is the final report for a DOE-funded research project describing the outcome of research on non-homogeneous hidden Markov models (NHMMs) and coupled ocean-atmosphere (O-A) intermediate-complexity models (ICMs) to identify the potentially predictable modes of climate variability, and to investigate their impacts on the regional-scale. The main results consist of extensive development of the hidden Markov models for rainfall simulation and downscaling specifically within the non-stationary climate change context together with the development of parallelized software; application of NHMMs to downscaling of rainfall projections over India; identification and analysis of decadal climate signals in data and models; and, studies ofmore » climate variability in terms of the dynamics of atmospheric flow regimes.« less

  6. Identifying impediments and solutions to sidewalk project implementation in Pennsylvania : final report.

    DOT National Transportation Integrated Search

    2016-09-30

    The purpose of this research project was to evaluate the implementation issues of sidewalk projects that are funded through various federal programs administrated by the Pennsylvania Department of Transportation (PennDOT). This evaluation has identif...

  7. Final Technical Report of project: "Contactless Real-Time Monitoring of Paper Mechanical Behavior During Papermaking"

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Emmanuel Lafond; Paul Ridgway; Ted Jackson

    The early precursors of laser ultrasonics on paper were Prof. Y. Berthelot from the Georgia Institute of Technology/Mechanical Engineering department, and Prof. P. Brodeur from the Institute of Paper Science and Technology, both located in Atlanta, Georgia. The first Ph.D. thesis that shed quite some light on the topic, but also left some questions unanswered, was completed by Mont A. Johnson in 1996. Mont Johnson was Prof. Berthelot's student at Georgia Tech. In 1997 P. Brodeur proposed a project involving himself, Y. Berthelot, Dr. Ken Telschow and Mr. Vance Deason from INL, Honeywell-Measurex and Dr. Rick Russo from LBNL. Themore » first time the proposal was not accepted and P. Brodeur decided to re-propose it without the involvement from LBNL. Rick Russo proposed a separate project on the same topic on his side. Both proposals were finally accepted and work started in the fall of 1997 on the two projects. Early on, the biggest challenge was to find an optical detection method which could detect laser-induced displacements of the web surface that are of the order of .1 micron in the ultrasonic range. This was to be done while the web was having an out-of-plane amplitude of motion in the mm range due to web flutter; while moving at 10 m/s to 30 m/s in the plane of the web, on the paper machine. Both teams grappled with the same problems and tried similar methods in some cases, but came up with two similar but different solutions one year later. The IPST, GT, INL team found that an interferometer made by Lasson Technologies Inc. using the photo-induced electro-motive force in Gallium Arsenide was able to detect ultrasonic waves up to 12-15 m/s. It also developed in house an interferometer using the Two-Wave Mixing effect in photorefractive crystals that showed good promises for on-line applications, and experimented with a scanning mirror to reduce motion-induced texture noise from the web and improve signal to noise ratio. On its side, LBNL had the idea to

  8. Trade and Industry Articulation Project: Final Report, 1981-82.

    ERIC Educational Resources Information Center

    Stewart, Betsy; And Others

    A project was undertaken at Cerritos College (CC) to establish a statewide model for the development of articulated trade and industry curriculum materials and methods that would allow students to move from the secondary to the college level without loss of time or resources. Six subject areas were chosen: auto body, automotive, drafting,…

  9. Colorado Better Buildings Project. Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Strife, Susie; Yancey, Lea

    The Colorado Better Buildings project intended to bring new and existing energy efficiency model programs to market with regional collaboration and funding partnerships. The goals for Boulder County and its program partners were to advance energy efficiency investments, stimulate economic growth in Colorado and advance the state’s energy independence. Collectively, three counties set out to complete 9,025 energy efficiency upgrades in 2.5 years and they succeeded in doing so. Energy efficiency upgrades have been completed in more than 11,000 homes and businesses in these communities. Boulder County and its partners received a $25 million BetterBuildings grant from the U.S. Departmentmore » of Energy under the American Recovery and Reinvestment Act in the summer of 2010. This was also known as the Energy Efficiency and Conservation Block Grants program. With this funding, Boulder County, the City and County of Denver, and Garfield County set out to design programs for the residential and commercial sectors to overcome key barriers in the energy upgrade process. Since January 2011, these communities have paired homeowners and business owners with an Energy Advisor – an expert to help move from assessment to upgrade with minimal hassle. Pairing this step-by-step assistance with financing incentives has effectively addressed many key barriers, resulting in energy efficiency improvements and happy customers. An expert energy advisor guides the building owner through every step of the process, coordinating the energy assessment, interpreting results for a customized action plan, providing a list of contractors, and finding and applying for all available rebates and low-interest loans. In addition to the expert advising and financial incentives, the programs also included elements of social marketing, technical assistance, workforce development and contractor trainings, project monitoring and verification, and a cloud-based customer data system to coordinate among

  10. Large resource development projects as markets for passive solar technologies. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roze-Benson, R V

    1980-12-01

    A basic premise of this study is that large resource development projects provide a major market opportunity for passive solar manufactured buildings. The primary objectives of the work are to document selected resource development projects and identify their potential housing needs and development schedules, to contact resource industry representatives and assess some of the processes and motivations behind their involvement in housing decisions, and to provide passive solar manufactured buildings producers with results of these steps as early initial market intelligence. The intent is to identify not only the industries, location of their planned projects, and their likely worker housingmore » needs, but also the individuals involved in making housing-related decisions. The 56 identified projects are located within 18 states and cover 11 types of resources. The report documents individual projects, provides protections of total worker-related housing needs, and presents overviews of resource development company involvement in the new construction market. In addition, the report profiles three organizations that expressed a strong interest in implementing the use of low-cost passive solar manufactured buildings in resource-development-related activities.« less

  11. Urban rail transit projects : forecast versus actual ridership and costs. final report

    DOT National Transportation Integrated Search

    1989-10-01

    Substantial errors in forecasting ridership and costs for the ten rail transit projects reviewed in this report, put forth the possibility that more accurate forecasts would have led decision-makers to select projects other than those reviewed in thi...

  12. Long-term performance of a hot in-place recycling project final report.

    DOT National Transportation Integrated Search

    2016-08-01

    This report documents the construction and long-term performance of a hot in-place recycled (HIPR) : project on SR 542. HIPR project selection, mix design, construction and testing are described. It was shown that : the HIPR process successfully reha...

  13. An International Comparison of Final-Year Design Project Curricula

    ERIC Educational Resources Information Center

    Kentish, Sandra E.; Shallcross, David C.

    2006-01-01

    This paper reviews design teaching at a total of 15 chemical engineering departments across Australia, Singapore, and the United Kingdom. The emphasis is on the capstone Design Project, which can be viewed as a major transition subject for students as they move into the workplace. The study shows that this subject has evolved to act as an…

  14. Data Needs in Vocational Education. "The Development of a Minimal Information System to Satisfy the Needs of Selected User Groups." Final Report. Volume III. Project EDNEED Lexicon.

    ERIC Educational Resources Information Center

    Nerden, J. T.; And Others

    Designed for the exclusive purpose of accompanying the Project EDNEED (Empirical Determination of Nationally Essential Educational Data) classification document, this volume comprises the third of a five-volume final report. It provides uniform definitions for vocational education terms found in the EDNEED classification document, and aids in…

  15. Final Report: "Collaborative Project. Understanding the Chemical Processes That Affect Growth Rates of Freshly Nucleated Particles"

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Smith, James N.; McMurry, Peter H.

    This final technical report describes our research activities that have, as the ultimate goal, the development of a model that explains growth rates of freshly nucleated particles. The research activities, which combine field observations with laboratory experiments, explore the relationship between concentrations of gas-phase species that contribute to growth and the rates at which those species are taken up. We also describe measurements of the chemical composition of freshly nucleated particles in a variety of locales, as well as properties (especially hygroscopicity) that influence their effects on climate. Our measurements include a self-organized, DOE-ARM funded project at the Southern Greatmore » Plains site, the New Particle Formation Study (NPFS), which took place during spring 2013. NPFS data are available to the research community on the ARM data archive, providing a unique suite observations of trace gas and aerosols that are associated with the formation and growth of atmospheric aerosol particles.« less

  16. Use of robotics for nondestructive inspection of steel highway bridges and structures : final report.

    DOT National Transportation Integrated Search

    2005-01-01

    This report presents the results of a project to finalize and apply a crawling robotic system for the remote visual inspection of high-mast light poles. The first part of the project focused on finalizing the prototype crawler robot hardware and cont...

  17. Measuring the impact of complete streets projects : preliminary field testing : final report.

    DOT National Transportation Integrated Search

    2016-12-01

    This report describes a field study that sought to assess the impact of Complete Streets (CS) projects in Buffalo, NY. Multiple data collection tools were deployed to capture a diversity of impacts on 8 street corridors where CS projects have been im...

  18. FY16 Safeguards Technology Cart-Portable Mass Spectrometer Project Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thompson, Cyril V.; Whitten, William B.

    The Oak Ridge National Laboratory project for the Next Generation Safeguards Initiative Safeguards Technology Development Subprogram has been involved in the development of a cart portable mass spectrometer based on a Thermo ITQ ion trap mass spectrometer (referred to simply as the ITQ) for the field analysis of 235U/238U ratios in UF6. A recent discovery of the project was that combining CO2 with UF6 and introducing the mixture to the mass spectrometer (MS) appeared to increase the ionization efficiency and, thus, reduce the amount of UF6 needed for an analysis while also reducing the corrosive effects of the sample. However,more » initial experimentation indicated that mixing parameters should be closely controlled to ensure reproducible results. To this end, a sample manifold (SM) that would ensure the precise mixing of UF6 and CO2 was designed and constructed. A number of experiments were outlined and conducted to determine optimum MS and SM conditions which would provide the most stable isotope ratio analysis. The principal objective of the project was to provide a retrofit ITQ mass spectrometer operating with a SM capable of achieving a variation in precision of less than 1% over 1 hour of sampling. This goal was achieved by project end with a variation in precision of 0.5 to 0.8% over 1 hour of sampling.« less

  19. FINAL PROJECT REPORT - EVALUATION AND TESTING OF HTGR REACTOR BUILDING RESPONSE TO DEPRESSURIZATION ACCIDENTS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ALLIANCE LIMITED, NGNP INDUSTRY

    This report provides a description of the project, summarizes each phase of the project, and ends with project conclusions. In addition, the report contains a descriptive index of the technical reports generated during the course of the project.

  20. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This Final Environmental Impact Statement and Environmental Impact Report (Final EIS/EIR) has been prepared to meet the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The Proposed Action includes the construction, operation, and decommissioning of a 48 megawatt (gross) geothermal power plant with ancillary facilities (10-12 production well pads and 3-5 injection well pads, production and injection pipelines), access roads, and a 230-kilovolt (kV) transmission line in the Modoc National Forest in Siskiyou County, California. Alternative locations for the power plant site within a reasonable distance of the middle of the wellfield weremore » determined to be technically feasible. Three power plant site alternatives are evaluated in the Final EIS/EIR.« less

  1. Adapting Project Management Practices to Research-Based Projects

    NASA Technical Reports Server (NTRS)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  2. 7 CFR 22.308 - Project approval.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Project approval. 22.308 Section 22.308 Agriculture... Governments § 22.308 Project approval. State and multicounty jurisdictional planning is a State and local..., determination of eligibility and feasibility and final approval of individual projects involving Federal funds...

  3. 7 CFR 22.308 - Project approval.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 1 2012-01-01 2012-01-01 false Project approval. 22.308 Section 22.308 Agriculture... Governments § 22.308 Project approval. State and multicounty jurisdictional planning is a State and local..., determination of eligibility and feasibility and final approval of individual projects involving Federal funds...

  4. 7 CFR 22.308 - Project approval.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 1 2013-01-01 2013-01-01 false Project approval. 22.308 Section 22.308 Agriculture... Governments § 22.308 Project approval. State and multicounty jurisdictional planning is a State and local..., determination of eligibility and feasibility and final approval of individual projects involving Federal funds...

  5. 7 CFR 2500.047 - Project meetings.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Project meetings. 2500.047 Section 2500.047... Post-Award and Closeout § 2500.047 Project meetings. In addition to reviewing and monitoring the status of progress and final technical reports and financial reports, OAO Project Officers may use regular...

  6. 7 CFR 22.308 - Project approval.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 1 2011-01-01 2011-01-01 false Project approval. 22.308 Section 22.308 Agriculture... Governments § 22.308 Project approval. State and multicounty jurisdictional planning is a State and local..., determination of eligibility and feasibility and final approval of individual projects involving Federal funds...

  7. 7 CFR 2500.047 - Project meetings.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Project meetings. 2500.047 Section 2500.047... Post-Award and Closeout § 2500.047 Project meetings. In addition to reviewing and monitoring the status of progress and final technical reports and financial reports, OAO Project Officers may use regular...

  8. Ural-Tweed Bighorn Sheep Wildlife Mitigation Project, 1984-1990 Final Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Young, Lewis R.; Yde, Chris A.

    The results of habitat improvement project activities accomplished under contract No.84-38 for bighorn sheep mitigation along Koocanusa Reservoir from September 1, 1984, through June 30, 1990, are reported here. Habitat treatments were applied to ten areas and covered 1100 acres. Treatments used were prescribed fire, slashing combined with prescribed fire, and fertilization. Several variations in season or intensity were used within the slashing and prescribed fire treatments. This project was coordinated with and complemented concurrent Kootenai National Forest habitat improvement activities.

  9. Apollo-Soyuz test project: Composite of MSFC final science report

    NASA Technical Reports Server (NTRS)

    1977-01-01

    Experimental procedures of nine experiments conducted during the Apollo-Soyuz Test Project mission from July 15th to July 24th, 1975 are presented. Conclusions and recommendations based on these experiments are given.

  10. Miami regional advanced traveler information system project : final evaluation report

    DOT National Transportation Integrated Search

    2002-04-01

    In 1999 the U.S. Congress earmarked funds for selected projects that were assessed as supporting the improvements of transportation efficiency, promoting safety, increasing traffic flow, reducing emissions, improving traveler information, enhancing a...

  11. KSC History Project

    NASA Technical Reports Server (NTRS)

    Dethloff, Henry C.

    2001-01-01

    The KSC History Project focuses on archival research and oral history interviews on the history of Kennedy Space Center (KSC). Related projects include the preparation of a precis and chapter outline for a proposed book-length narrative history, a bibliography of key primary and secondary resources, a brief monograph overview of the history of KSC, and a monograph on the history of safety at the Center. Finally, there is work on the development of a web page and a personal history data base associated with the oral history project. The KSC History Project has been a joint endeavor between Henry C. Dethloff and Dr. Noble Lee Snaples, Jr.

  12. Arts in Education for Handicapped Children. Final Report.

    ERIC Educational Resources Information Center

    Appell, Louise S.; Goldberg, Jamie

    The document presents the final report of the Arts in Education Project, a research project of the National Committee, Arts for the Handicapped to develop and measure the effects of an arts infused curriculum on the academic performance of handicapped elementary school children. A model for infusing the arts into the established curriculum was…

  13. Early Owner Planning Leads to Project Success

    ERIC Educational Resources Information Center

    Gainsboro, Dan

    2006-01-01

    In the vast majority of building projects, decisions made in the first 10 percent of project activity directly determine 90 percent of the final cost and schedule. When a project is poorly planned, project costs can expand beyond estimates by as much as 50 percent. Since the owner's rate of spending increases as a building project proceeds,…

  14. Project Final Report: The Institute for Sustained Performance, Energy, and Resilience (SUPER)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hollingsworth, Jeffrey K.

    This project concentrated on various aspects of creating and applying tool infrastructure to make it easier to effectively use large-scale parallel computers. This project was collaborative with Argonne National Laboratory, Lawrence Berkeley National Laboratory, Lawrence Livermore National Laboratory, Oak Ridge National Laboratory, U.C. San Diego, University of Maryland, University of North Carolina, University of Oregon, University Southern California, University of Tennessee, and University of Utah. The research conducted during this project at the University of Maryland is summarized in this report. The complete details of the work are available in the publications listed at the end of the report. Manymore » of the concepts created during this project have been incorporated into tools and made available as freely downloadable software (www.dyninst.org/harmony). It also supported the studies of six graduate students, one undergraduate student, and two post-docs. The funding also provided summer support for the PI and part of the salary of a research staff member.« less

  15. Electric vehicle life cycle cost analysis : final research project report.

    DOT National Transportation Integrated Search

    2017-02-01

    This project compared total life cycle costs of battery electric vehicles (BEV), plug-in hybrid electric vehicles (PHEV), hybrid electric vehicles (HEV), and vehicles with internal combustion engines (ICE). The analysis considered capital and operati...

  16. Project Atlas Field Definitions | NOAA Gulf Spill Restoration

    Science.gov Websites

    Archive Home Project Atlas Field Definitions Project Atlas Field Definitions Field Definition Project Title The Project Title as listed in the Final Early Restoration Plan and Environmental Assessment (FERP /EA). General Information: Project Description Narrative description of the project. General

  17. Domain Specific Language Support for Exascale. Final Project Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baden, Scott

    The project developed a domain specific translator enable legacy MPI source code to tolerate communication delays, which are increasing over time due to technological factors. The translator performs source-to-source translation that incorporates semantic information into the translation process. The output of the translator is a C program runs as a data driven program, and uses an existing run time to overlap communication automatically

  18. Final Technical Report of the project "Controlling Quantum Information by Quantum Correlations"

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Girolami, Davide

    The report describes hypotheses, aims, methods and results of the project 20170675PRD2, “Controlling Quantum Information by Quantum Correlations”, which has been run from July 31, 2017 to January 7, 2018. The technical work has been performed by Director’s Fellow Davide Girolami of the T-4 Division, Physics of Condensed Matter and Complex Systems, under the supervision of Wojciech Zurek (T-4), Lukasz Cincio (T-4), and Marcus Daniels (CCS-7). The project ended as Davide Girolami has been converted to J. R. Oppenheimer Fellow to work on the project 20180702PRD1, “Optimal Control of Quantum Machines”, started on January 8, 2018.

  19. Project #8 (95-008), Traveler Information Services (TIS), Final Report

    DOT National Transportation Integrated Search

    1995-12-15

    THE L-95 CORRIDOR COALITION'S TRAVELER INFORMATION SERVICES (TIS) PROJECT IS INTENDED TO IMPLEMENT AN ADVANCED TRAVELER INFORMATION SYSTEM TAILORED TO THE UNIQUE NEEDS OF THE NORTHEAST CORRIDOR. THE SYSTEM WILL ACQUIRE AND DISSEMINATE INFORMATION ON ...

  20. Electric vehicle fleet implications and analysis : final research project report.

    DOT National Transportation Integrated Search

    2016-11-01

    The objective of this project was to evaluate the implementation and effectiveness of : electric vehicles (EVs) used in fleet operations. The study focuses on Battery-Electric : Vehicles (BEVs) and Plug-In Hybrid Electric Vehicles (PHEVs); collective...

  1. Placement Component, Lincoln Career Education Project. Final Report. March, 1973-June, 1976.

    ERIC Educational Resources Information Center

    Novak, Carl D.; And Others

    The goal of the placement component of the 3-year Lincoln Career Education Project, Nebraska, was to establish placement services for youth of participating project schools. "Placement" referred not only to helping exiting senior high youth find employment, but also to developing the knowledge, skills, and attitudes which lead to…

  2. Integrated and Applied Curricula Discussion Group and Data Base Project. Final Report.

    ERIC Educational Resources Information Center

    Wisconsin Univ. - Stout, Menomonie. Center for Vocational, Technical and Adult Education.

    A project was conducted to compile integrated and applied curriculum resources, develop databases on the World Wide Web, and encourage networking for high school and technical college educators through an Internet discussion group. Activities conducted during the project include the creation of a web page to guide users to resource banks…

  3. Teacher-Designed Reform in Inservice Education. Final Report.

    ERIC Educational Resources Information Center

    Edelfelt, Roy A.; And Others

    This is the final report of the project on Teacher-Designed Reform in Teacher Education. The focus of the project was primarily on inservice education to improve instruction. The rationale was that teachers should determine the content and design of inservice education at the school building level on the basis of the kind of staff they want and…

  4. Penetrating School Strata through Career Education. Final Report.

    ERIC Educational Resources Information Center

    Nolan, Richard D.

    This is a final report of a 3-year project to modify the curriculum in the Bristol, Connecticut, school system by infusing career education concepts and practices into all subjects at all grade levels. The report includes a description of the four components of the project: Grades K-8, grades 9-12, development of job placement services, and…

  5. 75 FR 74770 - Final Treasury Decision; Comment Request for Regulation Project [127391-07], (TD 9403 Final)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-01

    ... Reduction Act of 1995, Public Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting... Effect of Unrelated Business Taxable Income on Charitable Remainder Trusts. DATES: Written comments... Unrelated Business Taxable Income on Charitable Remainder Trusts. OMB Number: 1545-2101. Regulation Project...

  6. Services for Children with Deaf-Blindness in Louisiana. Final Performance Report.

    ERIC Educational Resources Information Center

    Teddlie, Charles

    This final report describes activities and accomplishments of the Services for Children with Deaf-Blindness project, a 1-year federally supported project in Louisiana to improve identification and curriculum for these children by providing technical assistance and training to parents, school systems, and agency personnel. Project activities…

  7. 40 CFR 35.2216 - Notice of building completion and final inspection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Notice of building completion and final... Notice of building completion and final inspection. The grantee shall notify the Regional Administrator when the building of the project is complete. Final inspection shall be made by the Regional...

  8. Evaluation of Supported Placements in Integrated Community Environments Project (SPICE). Final Report.

    ERIC Educational Resources Information Center

    Wilson, Leslie; And Others

    This evaluation project was designed to assess 37 persons (ages 21-72) who had moved from intermediate care facilities or skilled nursing facilities into innovative one-person or two-person community integrated living arrangements as a result of the Supported Placements in Integrated Community Environments project. The 37 persons had severe or…

  9. Woodburn port-of-entry automation project, 1986 - 1993 : final report.

    DOT National Transportation Integrated Search

    1994-07-01

    In 1986, the Oregon State Highway Division (OSHD), in conjunction with the Public Utility Commission (PUC), and with the cooperation of the Federal Highway Administration (FHWA), under took an experimental project at the Woodburn southbound Port-of-E...

  10. Wordburn hot in-plant asphalt pavement recycling project : final report.

    DOT National Transportation Integrated Search

    1992-05-01

    In 1977, the Oregon Department of Transportation constructed a demonstration project using approximately 47,000 tons of stockpiled asphalt concrete (AC) material to overlay a section of pavement in Oregon. The stockpiled AC material was hot in-plant ...

  11. CleanFleet final report. Volume 2, project design and implementation

    DOT National Transportation Integrated Search

    1995-12-01

    The South Coast Alternative Fuels Demonstration, called CleanFleet, was conducted in the Los Angeles area from April 1992 through September 1994. The project evaluated five alternative motor fuels in commercial fleet service over a two-year period. T...

  12. El Toro Library Solar Heating and Cooling Demonstration Project. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This report is divided into a number of essentially independent sections, each of which covers a specific topic. The sections, and the topics covered, are as follows. Section 1 provides a brief summary description of the solar energy heating and cooling system including the key final design parameters. Section 2 contains a copy of the final Acceptance Test Report. Section 3 consists of a reduced set of final updated as-built mechanical, electrical, control and instrumentations drawings of the solar energy heating and cooling system. Section 4 provides a summary of system maintenance requirements, in the form of a maintenance schedulemore » which lists necessary maintenance tasks to be performed at monthly, quarterly, semi-annual, and annual intervals. Section 5 contains a series of photographs of the final solar energy system installation, including the collector field and the mechanical equipment room. Section 6 provides a concise summary of system operation and performance for the period of December 1981 through June 1982, as measured, computed and reported by Vitro Laboratories Division of Automation Industries, Inc., for the DOE National Solar Data Network. Section 7 provides a summary of key as-built design parameters, compared with the corresponding original design concept parameters. Section 8 provides a description of a series of significant problems encountered during construction, start-up and check-out of the solar energy heating and cooling system, together with the method employed to solve the problem at the time and/or recommendations for avoiding the problem in the future design of similar systems. Appendices A through H contain the installation, operation and maintenance submittals of the various manufacturers on the major items of equipment in the system. Reference CAPE-2823.« less

  13. Final EDP Ti: sapphire amplifiers for ELI project

    NASA Astrophysics Data System (ADS)

    Chvykov, Vladimir; Kalashnikov, Mikhail; Osvay, Károly

    2015-05-01

    Recently several ultrahigh intensity Chirped Pulse Amplification (CPA) laser systems have reached petawatt output powers [1, 2] setting the next milestone at tens or even hundreds petawatts for the next three to ten years [3, 4]. These remarkable results were reached when laser amplifiers (opposite to Optical Parametric Amplification (OPA) [5]) were used as final ones and from them Ti:Sapphire crystals supposed to be the working horses as well in the future design of these laser systems. Nevertheless, the main limitation that arises on the path toward ultrahigh output power and intensity is the restriction on the pumping and extraction energy imposed by Transverse Amplified Spontaneous Emission (TASE) [6] and/or transverse parasitic generation (TPG) [7] within the large aperture of the disc-shape amplifier volume.

  14. Western Illinois University Curriculum Revitalization Project. Final Report 1990-91.

    ERIC Educational Resources Information Center

    Western Illinois Univ., Macomb.

    The primary purpose of the Curriculum Revitalization Project was to provide assistance to Illinois vocational educators, administrators, regional administrators, and regional delivery system directors in strengthening vocational programs. Ten major accomplishments were achieved: (1) seven regional instructional materials coordinators (IMCs) were…

  15. Developing long range traffic projection models for Illinois : final report.

    DOT National Transportation Integrated Search

    2004-06-01

    The project objective was to develop a PC-based tool to assist Illinois Department of Transportation (IDOT) traffic forecasters : to meet FHWA reporting requirements for 2,400 HPMS sections and 27,000 structures in the State of Illinois, and to produ...

  16. Final Report of the Computer Assisted Learning Test Project. Report No. 19.

    ERIC Educational Resources Information Center

    Van der Drift, K. D.; And Others

    A pilot project was conducted to gain information to advise the Board of Directors at the University of Leyden as to the feasibility of using a computerized system to aid in instructional programs in the social sciences, law, medicine, arts, mathematics, and natural sciences at a low cost. The pilot project is divided into four parts which are…

  17. Project Aprendizaje. Transitional Bilingual Education, 1991-92. Final Evaluation Profile. OREA Report.

    ERIC Educational Resources Information Center

    Clark, Andrew

    Project Aprendizaje was designed to ease the transition of Latino immigrant students to life and education in the United States. In 1991-92, the project admitted 153 male and 145 female students of limited English proficiency plus 1 student of unspecified gender in grades 9 through 12 at Seward Park High School in Manhattan (New York City). The…

  18. The Study of Project Exodus: A School Racial Integration Project in Boston, Massachusetts. Final Report.

    ERIC Educational Resources Information Center

    Teele, James E.

    This voluntary school integration project uses the open enrollment plan of the Boston School Department in transporting Negro children from predominantly Negro schools in the black district to more racially balanced schools in other parts of Boston. It has involved private financing, intra-city bussing, and the initiative and participation of…

  19. Devils Lake Flood Control Project. Section 205. Detailed Project Report.

    DTIC Science & Technology

    1983-10-01

    Sd.U.JS IWE 00 RlEP0OAT II PERIOD COVERED SE~CTION 205 DETAILED PROJECT REPORT FLOOD CONTROL Final. Oct 1979-July 1983 PROJECT AT DEVILS LAKE. NORTH...a few feet. The light loading proposed for the site and thick cover of impervious material make more detailed evaluation of the strength and water...can cause low-oapaoity channels to overflow, resulting in flood damages to crops . Because the subbasin has no outlet near the existing water surface

  20. 78 FR 60021 - Proposed Collection: Comment Request for Regulation Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... DEPARTMENT OF THE TREASURY Internal Revenue Service [REG-120616-03(TD 9346 Final Regulations and Removal of Temporary Regulations)] Proposed Collection: Comment Request for Regulation Project AGENCY.... Regulation Project Number: REG-120616-03 (T.D. 9346 Final Regulations and Removal of Temporary Regulations...

  1. Final report on the maintenance asset management project : phase I.

    DOT National Transportation Integrated Search

    2012-07-01

    This project resulted in the development of a proof of concept for a features inventory process to be used by field staff. The resulting concept is adaptable for different asset classes (e.g. culverts, guardrail) and able to leverage existing DOT res...

  2. Career Awareness Program. Project CAP. 1989-90. Final Evaluation Report. OREA Report.

    ERIC Educational Resources Information Center

    Zhang, Hong

    An evaluation of the fourth year of funding of the Career Awareness Program (Project CAP) by Title VII of the Elementary and Secondary Education Act is presented. Project CAP provided instruction and support services to Chinese-speaking students (n=285), grades 5 through 9, at 2 intermediate schools in New York City, I.S. 73 in Queens and I.S. 131…

  3. Project PEGS! Practices in Effective Guidance Strategies: Interactive CD-ROM Series for Educators To Practice Positive Behavior Management Skills, October 1, 1999-December 30, 2002. Final Performance Report.

    ERIC Educational Resources Information Center

    Quirk, Constance A.

    This final report describes the activities and outcomes of a federally funded project designed to produce and field-test two computer-based interactive CD-ROMs: "PEGS! for Preschool" and "PEGS! for Secondary School". These programs, in a game format, provide beginning general and special educators with independent practice in…

  4. Baltimore Zoo digester project. Final report. [Elephants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gibson, P.W.

    The results of a project to produce methane using the manure from zoo animals as a feedstock is presented. Two digesters are in operation, the first (built in 1974) utilizing wastes from the Hippo House and a second (built in 1980) utilizing wastes from the Elephant House. Demonstrations on the utilization of the gas were performed during zoo exhibits. The Elephant House Digester has a capacity of 4200 gallons and a floating gas dome which can retain at least 150 cu ft of gas. Solar energy has been incorporated into the design to maintain digester temperature at 95/sup 0/F. Themore » system produces 50 cu ft per day. After cleaning the gas, it is used to generate electricity to power an electric light, a roof fan, and an air conditioner. The gas is also used to operate a gas range and a gas lamp. During the opening day exhibit, 50 meals were cooked using the bio-gas from just 2 elephants. (DMC)« less

  5. State-local policy management project. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-08-01

    The report describes case studies to explore new approaches for increasing state and local coordination in planning and managing programs in areas with significant scientific and technical components such as energy and environment. Specifically, the case studies reveal efforts of various states in the areas of energy conservation, weatherization, emergency preparedness, and air quality. Successes and failures of Maryland's decentralized approach to energy conservation are documented; success of the thermal and lighting efficiency standards program in Texas is discussed; state aid for local energy conservation programs in Clinton County, Michigan, is reviewed; and the success of the weatherization program inmore » Oregon is examined. Pilot programs in weatherization in Pennsylvania are shown to have led a statewide effort. Two Minnesota projects in emergency preparedness are documented and factors for success are listed. In addition, long-range planning for fuel shortages in New York is examined and the benefits of regional planning in Fairfax County, Virgina, are noted. Efforts are examined to improve air quality in Ohio, California, and New Jersey.« less

  6. Final Environmental Impact Statement for the JEA Circulating Fluidized Bed Combustor Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    2000-06-30

    This EIS assesses environmental issues associated with constructing and demonstrating a project that would be cost-shared by DOE and JEA (formerly the Jacksonville Electric Authority) under the Clean Coal Technology Program. The project would demonstrate circulating fluidized bed (CFB) combustion technology at JEA's existing Northside Generating Station in Jacksonville, Florida, about 9 miles northeast of the downtown area of Jacksonville. The new CFB combustor would use coal and petroleum coke to generate nearly 300 MW of electricity by repowering the existing Unit 2 steam turbine, a 297.5-MW unit that has been out of service since 1983. The proposed project ismore » expected to demonstrate emission levels of sulfur dioxide (SO{sub 2}), oxides of nitrogen (NO{sub x}), and particulate matter that would be lower than Clean Air Act limits while at the same time producing power more efficiently and at less cost than conventional coal utilization technologies. At their own risk, JEA has begun initial construction activities without DOE funding. Construction would take approximately two years and, consistent with the original JEA schedule, would be completed in December 2001. Demonstration of the proposed project would be conducted during a 2-year period from March 2002 until March 2004. In addition, JEA plans to repower the currently operating Unit 1 steam turbine about 6 to 12 months after the Unit 2 repowering without cost-shared funding from DOE. Although the proposed project consists of only the Unit 2 repowering, this EIS analyzes the Unit 1 repowering as a related action. The EIS also considers three reasonably foreseeable scenarios that could result from the no-action alternative in which DOE would not provide cost-shared funding for the proposed project. The proposed action, in which DOE would provide cost-shared finding for the proposed project, is DOE's preferred alternative. The EIS evaluates the principal environmental issues, including air quality

  7. Genesis field operational test : final evaluation report

    DOT National Transportation Integrated Search

    1997-09-01

    This document is the Final Evaluation Report for the Genesis Advanced Traveler Information System (ATIS) Field Operational Test (FOT). Genesis was one of the early projects sponsored by the US Department of Transportation (USDOT) Intelligent Transpor...

  8. Project LEEWAY for Single Parents. PY95 Final Detailed Report.

    ERIC Educational Resources Information Center

    Lee Coll., Baytown, TX.

    Project LEEWAY was implemented in July 1992 at Lee College, in Texas, to recruit low-income, academically disadvantaged single parents, displaced homemakers, and single pregnant women into nontraditional technical programs and provide necessary support services to ensure success. This report describes the implementation, components, and results of…

  9. Project WELD. Women's Education: Learning and Doing. A Final Report.

    ERIC Educational Resources Information Center

    Formative Evaluation Research Associates, Ann Arbor, MI.

    A project was undertaken to provide information about three types of education options available to undergraduate women: internships, women's studies classes, and skills development classes or workshops. Eight schools participated in the study: Wellesley College, Mt. Holyoke College, Cedar Crest College, Wells College, Westbrook College, Mt.…

  10. Project UPSTART. Final Report, October 1, 1983-September 30, 1984.

    ERIC Educational Resources Information Center

    Frain, Joan

    Project UPSTART, during this fourth year of outreach, offered assistance in replicating its developed Sequenced Neuro-Sensorimotor Program (SNSP) for severely multihandicapped infants, pre-schoolers, young adults and their families. Future replication sites were identified. Programs received outreach assistance in the areas of staff training,…

  11. Informal science educators network project Association of Science-Technology Centers Incorporated. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-05-09

    Funding from the Department of Energy and the Annenberg/CPB Math and Science Project have helped the Association of Science-technology Centers Incorporated (ASTC) to establish and sustain an on-line community of informal science educators nationwide. The Project, called the Informal Science Educators Network Project (ISEN), is composed primarily of informal science educators and exhibit developers from science centers, museums, zoos, aquariums, botanical gardens, parks, and nature centers. Although museum-based professionals represent the majority of subscribers to ISEN, also involved are some classroom teachers and teacher educators from colleges and universities. Common to all ISEN participants is a commitment to school andmore » science education reform. Specifically, funding from the Department of Energy helped to boot strap the effort, providing Barrier Reduction Vouchers to 123 educators that enabled them participate in ISEN. Among the major accomplishments of the Project are these: (1) assistance to 123 informal science educators to attend Internet training sessions held in connection with the Project and/or purchase hardware and software that linked them to the Internet; (2) Internet training for 153 informal science educators; (3) development of a listserv which currently has over 180 subscribers--an all-time high; (4) opportunity to participate in four web chats involving informal science educators with noted researchers; (5) development of two sites on the World Wide Web linking informal science educators to Internet resources; (6) creation of an on-line collection of over 40 articles related to inquiry-based teaching and science education reform. In order to continue the momentum of the Project, ASTC has requested from the Annenberg/CPB Math and Science project a no/cost extension through December 1997.« less

  12. Technology Assessment Software Package: Final Report.

    ERIC Educational Resources Information Center

    Hutinger, Patricia L.

    This final report describes the Technology Assessment Software Package (TASP) Project, which produced developmentally appropriate technology assessment software for children from 18 months through 8 years of age who have moderate to severe disabilities that interfere with their interaction with people, objects, tasks, and events in their…

  13. 7 CFR 3560.102 - Housing project management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Housing project management. 3560.102 Section 3560.102... § 3560.102 Housing project management. (a) General. Borrowers hold final responsibility for housing project management and must ensure that operations comply with the terms of all loan or grant documents...

  14. Final Independent External Peer Review Report for the Intake Diversion Dam Modification Lower Yellowstone Project, Montana Draft Supplement to the 26 April 2010 Environmental Assessment and Appendices

    DTIC Science & Technology

    2013-02-08

    Fish and Wildlife Service WRDA Water Resources Development Act Intake Project IEPR Final IEPR Report February 8, 2013 x... Wildlife Service (USFWS), Natural Resources Conservation Service (NRCS), Montana Department of Environmental Quality, The Nature Conservancy...30% design features and channel entrance and exit pre-appraisal study to provide fish passage around Intake Dam, Montana. U.S. Fish and Wildlife

  15. Phase II: Final Report. Northern New Mexico Energy Education Project.

    ERIC Educational Resources Information Center

    New Mexico Highlands Univ., Las Vegas.

    Objectives of the Northern New Mexico Energy Education Project were to: (1) improve teachers' knowledge of energy-related subject matter and energy-related educational materials; (2) develop continuing communication and cooperation between elementary and junior high staffs and the university on energy-related matters; and (3) provide follow-up…

  16. 10 CFR 473.24 - Final action and certification by manager.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 3 2013-01-01 2013-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final action...

  17. 10 CFR 473.24 - Final action and certification by manager.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final action...

  18. 10 CFR 473.24 - Final action and certification by manager.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final action...

  19. 10 CFR 473.24 - Final action and certification by manager.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 3 2012-01-01 2012-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final action...

  20. 10 CFR 473.24 - Final action and certification by manager.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 3 2014-01-01 2014-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final action...