Sample records for handling maintenance operations

  1. DOE-EM-45 PACKAGING OPERATIONS AND MAINTENANCE COURSE

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Watkins, R.; England, J.

    2010-05-28

    Savannah River National Laboratory - Savannah River Packaging Technology (SRNL-SRPT) delivered the inaugural offering of the Packaging Operations and Maintenance Course for DOE-EM-45's Packaging Certification Program (PCP) at the University of South Carolina Aiken on September 1 and 2, 2009. Twenty-nine students registered, attended, and completed this training. The DOE-EM-45 Packaging Certification Program (PCP) sponsored the presentation of a new training course, Packaging Maintenance and Operations, on September 1-2, 2009 at the University of South Carolina Aiken (USC-Aiken) campus in Aiken, SC. The premier offering of the course was developed and presented by the Savannah River National Laboratory, and attendedmore » by twenty-nine students across the DOE, NNSA and private industry. This training informed package users of the requirements associated with handling shipping containers at a facility (user) level and provided a basic overview of the requirements typically outlined in Safety Analysis Report for Packaging (SARP) Chapters 1, 7, and 8. The course taught packaging personnel about the regulatory nature of SARPs to help reduce associated and often costly packaging errors. Some of the topics covered were package contents, loading, unloading, storage, torque requirements, maintaining records, how to handle abnormal conditions, lessons learned, leakage testing (including demonstration), and replacement parts. The target audience for this course was facility operations personnel, facility maintenance personnel, and field quality assurance personnel who are directly involved in the handling of shipping containers. The training also aimed at writers of SARP Chapters 1, 7, and 8, package designers, and anyone else involved in radioactive material packaging and transportation safety. Student feedback and critiques of the training were very positive. SRNL will offer the course again at USC Aiken in September 2010.« less

  2. Proposed space shuttle cargo handling criteria at the operational site (preliminary)

    NASA Technical Reports Server (NTRS)

    Beck, P. E.

    1972-01-01

    The criteria for cargo handling at the operational site of space shuttles are presented, based on assumed program requirements. The concepts for the following functions are described: maintenance and checkout facility, transfer to launch pad, and launch pad. The requirements for the ground equipment are given along with the general sequences for cargo loading.

  3. Prevalence of operator fatigue in winter maintenance operations.

    PubMed

    Camden, Matthew C; Medina-Flintsch, Alejandra; Hickman, Jeffrey S; Bryce, James; Flintsch, Gerardo; Hanowski, Richard J

    2018-02-02

    Similar to commercial motor vehicle drivers, winter maintenance operators are likely to be at an increased risk of becoming fatigued while driving due to long, inconsistent shifts, environmental stressors, and limited opportunities for sleep. Despite this risk, there is little research concerning the prevalence of winter maintenance operator fatigue during winter emergencies. The purpose of this research was to investigate the prevalence, sources, and countermeasures of fatigue in winter maintenance operations. Questionnaires from 1043 winter maintenance operators and 453 managers were received from 29 Clear Road member states. Results confirmed that fatigue was prevalent in winter maintenance operations. Over 70% of the operators and managers believed that fatigue has a moderate to significant impact on winter maintenance operations. Approximately 75% of winter maintenance operators reported to at least sometimes drive while fatigued, and 96% of managers believed their winter maintenance operators drove while fatigued at least some of the time. Furthermore, winter maintenance operators and managers identified fatigue countermeasures and sources of fatigue related to winter maintenance equipment. However, the countermeasures believed to be the most effective at reducing fatigue during winter emergencies (i.e., naps) were underutilized. For example, winter maintenance operators reported to never use naps to eliminate fatigue. These results indicated winter maintenance operations are impacted by operator fatigue. These results support the increased need for research and effective countermeasures targeting winter maintenance operator fatigue. Copyright © 2018 Elsevier Ltd. All rights reserved.

  4. TCMS operations and maintenance philosophy

    NASA Technical Reports Server (NTRS)

    Buehler, David P.; Griffin, Rock E.

    1992-01-01

    The purpose is to describe the basic philosophies of operating and maintaining the Test, Control, and Monitor System (TCMS) equipment. TCMS is a complex and sophisticated checkout system. Operations and maintenance processes developed to support it will be based upon current experience, but will be focused on the specific needs of TCMS in support of Space Station Freedom Program (SSFP) and related activities. An overview of the operations and maintenance goals and philosophies are presented. The assumptions, roles and responsibilities, concepts and interfaces for operation, on-line maintenance, off-line support, and Operations and Maintenance (O&M) personnel training on all TCMS equipment located at KSC are described.

  5. 14 CFR 91.407 - Operation after maintenance, preventive maintenance, rebuilding, or alteration.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... flies the aircraft, makes an operational check of the maintenance performed or alteration made, and logs... maintenance, preventive maintenance, rebuilding, or alteration. (a) No person may operate any aircraft that... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Operation after maintenance, preventive...

  6. 14 CFR 91.407 - Operation after maintenance, preventive maintenance, rebuilding, or alteration.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... flies the aircraft, makes an operational check of the maintenance performed or alteration made, and logs... maintenance, preventive maintenance, rebuilding, or alteration. (a) No person may operate any aircraft that... 14 Aeronautics and Space 2 2013-01-01 2013-01-01 false Operation after maintenance, preventive...

  7. 14 CFR 91.407 - Operation after maintenance, preventive maintenance, rebuilding, or alteration.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... flies the aircraft, makes an operational check of the maintenance performed or alteration made, and logs... maintenance, preventive maintenance, rebuilding, or alteration. (a) No person may operate any aircraft that... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Operation after maintenance, preventive...

  8. 14 CFR 91.407 - Operation after maintenance, preventive maintenance, rebuilding, or alteration.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... flies the aircraft, makes an operational check of the maintenance performed or alteration made, and logs... maintenance, preventive maintenance, rebuilding, or alteration. (a) No person may operate any aircraft that... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Operation after maintenance, preventive...

  9. 14 CFR 91.407 - Operation after maintenance, preventive maintenance, rebuilding, or alteration.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... flies the aircraft, makes an operational check of the maintenance performed or alteration made, and logs... maintenance, preventive maintenance, rebuilding, or alteration. (a) No person may operate any aircraft that... 14 Aeronautics and Space 2 2014-01-01 2014-01-01 false Operation after maintenance, preventive...

  10. Operational Interventions to Maintenance Error

    NASA Technical Reports Server (NTRS)

    Kanki, Barbara G.; Walter, Diane; Dulchinos, VIcki

    1997-01-01

    A significant proportion of aviation accidents and incidents are known to be tied to human error. However, research of flight operational errors has shown that so-called pilot error often involves a variety of human factors issues and not a simple lack of individual technical skills. In aircraft maintenance operations, there is similar concern that maintenance errors which may lead to incidents and accidents are related to a large variety of human factors issues. Although maintenance error data and research are limited, industry initiatives involving human factors training in maintenance have become increasingly accepted as one type of maintenance error intervention. Conscientious efforts have been made in re-inventing the team7 concept for maintenance operations and in tailoring programs to fit the needs of technical opeRAtions. Nevertheless, there remains a dual challenge: 1) to develop human factors interventions which are directly supported by reliable human error data, and 2) to integrate human factors concepts into the procedures and practices of everyday technical tasks. In this paper, we describe several varieties of human factors interventions and focus on two specific alternatives which target problems related to procedures and practices; namely, 1) structured on-the-job training and 2) procedure re-design. We hope to demonstrate that the key to leveraging the impact of these solutions comes from focused interventions; that is, interventions which are derived from a clear understanding of specific maintenance errors, their operational context and human factors components.

  11. Handling Qualities Implications for Crewed Spacecraft Operations

    NASA Technical Reports Server (NTRS)

    Bailey, Randall E.; Jackson, E. Bruce; Arthur, J. J.

    2012-01-01

    Abstract Handling qualities embody those qualities or characteristics of an aircraft that govern the ease and precision with which a pilot is able to perform the tasks required in support of an aircraft role. These same qualities are as critical, if not more so, in the operation of spacecraft. A research, development, test, and evaluation process was put into effect to identify, understand, and interpret the engineering and human factors principles which govern the pilot-vehicle dynamic system as they pertain to space exploration missions and tasks. Toward this objective, piloted simulations were conducted at the NASA Langley Research Center and Ames Research Center for earth-orbit proximity operations and docking and lunar landing. These works provide broad guidelines for the design of spacecraft to exhibit excellent handling characteristics. In particular, this work demonstrates how handling qualities include much more than just stability and control characteristics of a spacecraft or aircraft. Handling qualities are affected by all aspects of the pilot-vehicle dynamic system, including the motion, visual and aural cues of the vehicle response as the pilot performs the required operation or task. A holistic approach to spacecraft design, including the use of manual control, automatic control, and pilot intervention/supervision is described. The handling qualities implications of design decisions are demonstrated using these pilot-in-the-loop evaluations of docking operations and lunar landings.

  12. Depot Maintenance: Executed Workload and Maintenance Operations at DOD Depots

    DTIC Science & Technology

    2017-02-03

    Page 1 GAO-17-82R Depot Maintenance 441 G St. N.W. Washington, DC 20548 February 3, 2017 The Honorable John McCain Chairman The...Smith Ranking Member Committee on Armed Services House of Representatives Depot Maintenance : Executed Workload and Maintenance Operations at DOD...Depots The Department of Defense (DOD) uses its maintenance capabilities to maintain, overhaul, and repair its military weapon systems (such as

  13. 40 CFR 35.2206 - Operation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 35.2206 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL... operation and maintenance manual. (2) In projects where a component is placed in operation before completion... project until a final operation and maintenance manual for the operating component is furnished and...

  14. Operations and maintenance philosophy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DUNCAN, G.P.

    1999-10-28

    This Operations and Maintenance (O&M) Philosophy document is intended to establish a future O&M vision, with an increased focus on minimizing worker exposure, ensuring uninterrupted retrieval operations, and minimizing operation life-cycle cost. It is intended that this document would incorporate O&M lessons learned into on-going and future project upgrades.

  15. 49 CFR 236.1039 - Operations and Maintenance Manual.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Operations and Maintenance Manual. 236.1039... Train Control Systems § 236.1039 Operations and Maintenance Manual. (a) The railroad shall catalog and..., modification, inspection, and testing of the PTC system and have them in one Operations and Maintenance Manual...

  16. Void Fraction Instrument operation and maintenance manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Borgonovi, G.; Stokes, T.I.; Pearce, K.L.

    This Operations and Maintenance Manual (O&MM) addresses riser installation, equipment and personnel hazards, operating instructions, calibration, maintenance, removal, and other pertinent information necessary to safely operate and store the Void Fraction Instrument. Final decontamination and decommissioning of the Void Fraction Instrument are not covered in this document.

  17. Inertial Fusion Power Plant Concept of Operations and Maintenance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anklam, T.; Knutson, B.; Dunne, A. M.

    2015-01-15

    Parsons and LLNL scientists and engineers performed design and engineering work for power plant pre-conceptual designs based on the anticipated laser fusion demonstrations at the National Ignition Facility (NIF). Work included identifying concepts of operations and maintenance (O&M) and associated requirements relevant to fusion power plant systems analysis. A laser fusion power plant would incorporate a large process and power conversion facility with a laser system and fusion engine serving as the heat source, based in part on some of the systems and technologies advanced at NIF. Process operations would be similar in scope to those used in chemical, oilmore » refinery, and nuclear waste processing facilities, while power conversion operations would be similar to those used in commercial thermal power plants. While some aspects of the tritium fuel cycle can be based on existing technologies, many aspects of a laser fusion power plant presents several important and unique O&M requirements that demand new solutions. For example, onsite recovery of tritium; unique remote material handling systems for use in areas with high radiation, radioactive materials, or high temperatures; a five-year fusion engine target chamber replacement cycle with other annual and multi-year cycles anticipated for major maintenance of other systems, structures, and components (SSC); and unique SSC for fusion target waste recycling streams. This paper describes fusion power plant O&M concepts and requirements, how O&M requirements could be met in design, and how basic organizational and planning issues can be addressed for a safe, reliable, economic, and feasible fusion power plant.« less

  18. Inertial fusion power plant concept of operations and maintenance

    NASA Astrophysics Data System (ADS)

    Knutson, Brad; Dunne, Mike; Kasper, Jack; Sheehan, Timothy; Lang, Dwight; Anklam, Tom; Roberts, Valerie; Mau, Derek

    2015-02-01

    Parsons and LLNL scientists and engineers performed design and engineering work for power plant pre-conceptual designs based on the anticipated laser fusion demonstrations at the National Ignition Facility (NIF). Work included identifying concepts of operations and maintenance (O&M) and associated requirements relevant to fusion power plant systems analysis. A laser fusion power plant would incorporate a large process and power conversion facility with a laser system and fusion engine serving as the heat source, based in part on some of the systems and technologies advanced at NIF. Process operations would be similar in scope to those used in chemical, oil refinery, and nuclear waste processing facilities, while power conversion operations would be similar to those used in commercial thermal power plants. While some aspects of the tritium fuel cycle can be based on existing technologies, many aspects of a laser fusion power plant presents several important and unique O&M requirements that demand new solutions. For example, onsite recovery of tritium; unique remote material handling systems for use in areas with high radiation, radioactive materials, or high temperatures; a five-year fusion engine target chamber replacement cycle with other annual and multi-year cycles anticipated for major maintenance of other systems, structures, and components (SSC); and unique SSC for fusion target waste recycling streams. This paper describes fusion power plant O&M concepts and requirements, how O&M requirements could be met in design, and how basic organizational and planning issues can be addressed for a safe, reliable, economic, and feasible fusion power plant.

  19. 7 CFR 654.15 - Operation and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 6 2011-01-01 2011-01-01 false Operation and maintenance. 654.15 Section 654.15 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Federal Financially-Assisted Projects...

  20. 7 CFR 654.15 - Operation and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 6 2012-01-01 2012-01-01 false Operation and maintenance. 654.15 Section 654.15 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Federal Financially-Assisted Projects...

  1. 7 CFR 654.15 - Operation and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 6 2013-01-01 2013-01-01 false Operation and maintenance. 654.15 Section 654.15 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Federal Financially-Assisted Projects...

  2. Operation and maintenance cost-cutting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hollingshead, T.W.

    This presentation by Timothy W. Hollingshead, Technical Services Manager, Pacific Gas and Electric, is about cutting costs in the Operation and Maintenance phase of geothermal energy production. The necessity of cost control, keeping workers well-trained and avoiding OSHA fines, taking advantages of new technologies, and establishing predictive maintenance programs are some of the issues discussed in this article.

  3. Safety and maintenance engineering: A compilation

    NASA Technical Reports Server (NTRS)

    1974-01-01

    A compilation is presented for the dissemination of information on technological developments which have potential utility outside the aerospace and nuclear communities. Safety of personnel engaged in the handling of hazardous materials and equipment, protection of equipment from fire, high wind, or careless handling by personnel, and techniques for the maintenance of operating equipment are reported.

  4. [12th Annual] Maintenance & Operations Cost Study.

    ERIC Educational Resources Information Center

    Deriso, Jerald L.; Lane, C. Jerome

    1983-01-01

    Comparisons are shown between budgeted maintenance and operations costs for 1982-83 and the preceding two years' actual costs. Also provided is a summary of a 10-year comparison of net current expenditures per student, compared with maintenance and operations costs per student. Data are presented for 10 geographical regions. (MLF)

  5. 13th Annual Maintenance & Operations Cost Study.

    ERIC Educational Resources Information Center

    Deriso, Jerald L.

    1984-01-01

    Comparisons are drawn between budgeted maintenance and operations costs for 1983-84 and the preceding 2 years' actual costs. Also provided is a summary of a 10-year comparison of net current expenditures per student, compared with maintenance and operations costs per student. Data are presented for 10 geographical regions. (MLF)

  6. 49 CFR 193.2713 - Training: operations and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... maintenance activities; and (iii) To carry out aspects of the operating and maintenance procedures under... instructions on the facility operations, including controls, functions, and operating procedures; and (ii) To understand the LNG transfer procedures provided under § 193.2513. (b) A written plan of continuing...

  7. 49 CFR 193.2713 - Training: operations and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... maintenance activities; and (iii) To carry out aspects of the operating and maintenance procedures under... instructions on the facility operations, including controls, functions, and operating procedures; and (ii) To understand the LNG transfer procedures provided under § 193.2513. (b) A written plan of continuing...

  8. 49 CFR 193.2713 - Training: operations and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... maintenance activities; and (iii) To carry out aspects of the operating and maintenance procedures under... instructions on the facility operations, including controls, functions, and operating procedures; and (ii) To understand the LNG transfer procedures provided under § 193.2513. (b) A written plan of continuing...

  9. 49 CFR 193.2713 - Training: operations and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... maintenance activities; and (iii) To carry out aspects of the operating and maintenance procedures under... instructions on the facility operations, including controls, functions, and operating procedures; and (ii) To understand the LNG transfer procedures provided under § 193.2513. (b) A written plan of continuing...

  10. 49 CFR 193.2713 - Training: operations and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... maintenance activities; and (iii) To carry out aspects of the operating and maintenance procedures under... instructions on the facility operations, including controls, functions, and operating procedures; and (ii) To understand the LNG transfer procedures provided under § 193.2513. (b) A written plan of continuing...

  11. Orion Handling Qualities During ISS Proximity Operations and Docking

    NASA Technical Reports Server (NTRS)

    Stephens, John-Paul; Vos, Gordon A.; Bilimoria, Karl D.; Mueller, Eric R.; Brazzel, Jack; Spehar, Pete

    2011-01-01

    NASA's Orion spacecraft is designed to autonomously rendezvous and dock with many vehicles including the International Space Station. However, the crew is able to assume manual control of the vehicle s attitude and flight path. In these instances, Orion must meet handling qualities requirements established by NASA. Two handling qualities assessments were conducted at the Johnson Space Center to evaluate preliminary designs of the vehicle using a six degree of freedom, high-fidelity guidance, navigation, and control simulation. The first assessed Orion s handling qualities during the last 20 ft before docking, and included both steady and oscillatory motions of the docking target. The second focused on manual acquisition of the docking axis during the proximity operations phase and subsequent station-keeping. Cooper-Harper handling qualities ratings, workload ratings and comments were provided by 10 evaluation pilots for the docking study and 5 evaluation pilots for the proximity operations study. For the docking task, both cases received 90% Level 1 (satisfactory) handling qualities ratings, exceeding NASA s requirement. All ratings for the ProxOps task were Level 1. These evaluations indicate that Orion is on course to meet NASA's handling quality requirements for ProxOps and docking.

  12. 21 CFR 878.5070 - Air-handling apparatus for a surgical operating room.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Air-handling apparatus for a surgical operating room. 878.5070 Section 878.5070 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND....5070 Air-handling apparatus for a surgical operating room. (a) Identification. Air-handling apparatus...

  13. 21 CFR 878.5070 - Air-handling apparatus for a surgical operating room.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Air-handling apparatus for a surgical operating room. 878.5070 Section 878.5070 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND....5070 Air-handling apparatus for a surgical operating room. (a) Identification. Air-handling apparatus...

  14. 7 CFR 654.20 - Violations of operation and maintenance agreement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Violations of operation and maintenance agreement. 654... RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Federal Financially-Assisted Projects § 654.20 Violations of operation and maintenance agreement. (a) The...

  15. 7 CFR 1470.23 - Conservation activity operation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Conservation activity operation and maintenance. 1470... STEWARDSHIP PROGRAM Contracts and Payments § 1470.23 Conservation activity operation and maintenance. The participant will operate and maintain existing conservation activities on the agricultural operation to at...

  16. 7 CFR 654.12 - Financing operations and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Financing operations and maintenance. 654.12 Section 654.12 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES... Financially-Assisted Projects § 654.12 Financing operations and maintenance. Sources of funds needed to...

  17. Operations and Maintenance May Newsletter | Poster

    Cancer.gov

    Occurring without notice, unscheduled utility outages (mainly electrical) are abrupt and create a nuisance. During an unscheduled electrical power outage, the Operations and Maintenance (O&M) department will monitor stand-by generators for proper operation.

  18. Highway Maintenance Equipment Operator. Miscellaneous Equipment. Training Materials.

    ERIC Educational Resources Information Center

    Perky, Sandra Dutreau; And Others

    This curriculum guide provides instructional materials to assist in training equipment operators in the safe and effective use of highway maintenance equipment. It includes six units of instruction covering the small, specialized equipment used in maintenance operations. Each unit of instruction consists of eight basic components: performance…

  19. Highway Maintenance Equipment Operator. Specialized Equipment. Training Materials.

    ERIC Educational Resources Information Center

    Perky, Sandra Dutreau; And Others

    This curriculum guide provides instructional materials to assist in training equipment operators in the safe and effective use of highway maintenance equipment. It includes 18 units of instruction covering the large equipment used in maintenance operations. Each unit of instruction consists of eight basic components: performance objectives,…

  20. Distributed Generation Energy Technology Operations and Maintenance Costs |

    Science.gov Websites

    Costs Distributed Generation Energy Technology Operations and Maintenance Costs Transparent Cost Database Button The following charts indicate recent operations and maintenance (O&M) cost estimates available national-level cost data from a variety of sources. Costs in your specific location will vary. The

  1. 7 CFR 1470.23 - Conservation activity operation and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 10 2011-01-01 2011-01-01 false Conservation activity operation and maintenance. 1470... STEWARDSHIP PROGRAM Contracts and Payments § 1470.23 Conservation activity operation and maintenance. The participant will maintain and manage existing conservation activities on the agricultural operation to at...

  2. CARRIER PREPARATION BUILDING MATERIALS HANDLING SYSTEM DESCRIPTION DOCUMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    E.F. Loros

    2000-06-28

    The Carrier Preparation Building Materials Handling System receives rail and truck shipping casks from the Carrier/Cask Transport System, and inspects and prepares the shipping casks for return to the Carrier/Cask Transport System. Carrier preparation operations for carriers/casks received at the surface repository include performing a radiation survey of the carrier and cask, removing/retracting the personnel barrier, measuring the cask temperature, removing/retracting the impact limiters, removing the cask tie-downs (if any), and installing the cask trunnions (if any). The shipping operations for carriers/casks leaving the surface repository include removing the cask trunnions (if any), installing the cask tie-downs (if any), installingmore » the impact limiters, performing a radiation survey of the cask, and installing the personnel barrier. There are four parallel carrier/cask preparation lines installed in the Carrier Preparation Building with two preparation bays in each line, each of which can accommodate carrier/cask shipping and receiving. The lines are operated concurrently to handle the waste shipping throughputs and to allow system maintenance operations. One remotely operated overhead bridge crane and one remotely operated manipulator is provided for each pair of carrier/cask preparation lines servicing four preparation bays. Remotely operated support equipment includes a manipulator and tooling and fixtures for removing and installing personnel barriers, impact limiters, cask trunnions, and cask tie-downs. Remote handling equipment is designed to facilitate maintenance, dose reduction, and replacement of interchangeable components where appropriate. Semi-automatic, manual, and backup control methods support normal, abnormal, and recovery operations. Laydown areas and equipment are included as required for transportation system components (e.g., personnel barriers and impact limiters), fixtures, and tooling to support abnormal and recovery operations

  3. 36th Annual Maintenance & Operations Cost Study: Schools

    ERIC Educational Resources Information Center

    Agron, Joe

    2007-01-01

    Spending by school districts on maintenance and operations increased in 2006-2007, reversing years of historic low expenditures. According to "American School & University's" 36th annual Maintenance and Operations (M&O) Cost Study, the median school district spends 9.19% of total district expenditures (TDE) on M&O, up from 7.58% the year before.…

  4. 7 CFR 654.41 - Performance of operation and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 6 2012-01-01 2012-01-01 false Performance of operation and maintenance. 654.41 Section 654.41 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Emergency...

  5. 7 CFR 654.41 - Performance of operation and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 6 2011-01-01 2011-01-01 false Performance of operation and maintenance. 654.41 Section 654.41 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Emergency...

  6. 7 CFR 654.41 - Performance of operation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 6 2010-01-01 2010-01-01 false Performance of operation and maintenance. 654.41 Section 654.41 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Emergency...

  7. 7 CFR 654.41 - Performance of operation and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 6 2013-01-01 2013-01-01 false Performance of operation and maintenance. 654.41 Section 654.41 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Emergency...

  8. 7 CFR 654.41 - Performance of operation and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 6 2014-01-01 2014-01-01 false Performance of operation and maintenance. 654.41 Section 654.41 Agriculture Regulations of the Department of Agriculture (Continued) NATURAL RESOURCES CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Emergency...

  9. 21 CFR 1250.32 - Food-handling operations.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 8 2014-04-01 2014-04-01 false Food-handling operations. 1250.32 Section 1250.32 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) REGULATIONS UNDER CERTAIN OTHER ACTS ADMINISTERED BY THE FOOD AND DRUG ADMINISTRATION INTERSTATE CONVEYANCE...

  10. 21 CFR 1250.32 - Food-handling operations.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Food-handling operations. 1250.32 Section 1250.32 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) REGULATIONS UNDER CERTAIN OTHER ACTS ADMINISTERED BY THE FOOD AND DRUG ADMINISTRATION INTERSTATE CONVEYANCE...

  11. 21 CFR 1250.32 - Food-handling operations.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 8 2013-04-01 2013-04-01 false Food-handling operations. 1250.32 Section 1250.32 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) REGULATIONS UNDER CERTAIN OTHER ACTS ADMINISTERED BY THE FOOD AND DRUG ADMINISTRATION INTERSTATE CONVEYANCE...

  12. 21 CFR 1250.32 - Food-handling operations.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Food-handling operations. 1250.32 Section 1250.32 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) REGULATIONS UNDER CERTAIN OTHER ACTS ADMINISTERED BY THE FOOD AND DRUG ADMINISTRATION INTERSTATE CONVEYANCE...

  13. 21 CFR 1250.32 - Food-handling operations.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Food-handling operations. 1250.32 Section 1250.32 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) REGULATIONS UNDER CERTAIN OTHER ACTS ADMINISTERED BY THE FOOD AND DRUG ADMINISTRATION INTERSTATE CONVEYANCE...

  14. Maintenance and operations decision support tool : Clarus regional demonstrations.

    DOT National Transportation Integrated Search

    2011-01-01

    Weather affects almost all maintenance activity decisions. The Federal Highway Administration (FHWA) tested a new decision support system for maintenance in Iowa, Indiana, and Illinois called the Maintenance and Operations Decision Support System (MO...

  15. 40 CFR 280.31 - Operation and maintenance of corrosion protection.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false Operation and maintenance of corrosion... UNDERGROUND STORAGE TANKS (UST) General Operating Requirements § 280.31 Operation and maintenance of corrosion protection. All owners and operators of steel UST systems with corrosion protection must comply with the...

  16. 40 CFR 280.31 - Operation and maintenance of corrosion protection.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false Operation and maintenance of corrosion... UNDERGROUND STORAGE TANKS (UST) General Operating Requirements § 280.31 Operation and maintenance of corrosion protection. All owners and operators of steel UST systems with corrosion protection must comply with the...

  17. 40 CFR 280.31 - Operation and maintenance of corrosion protection.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Operation and maintenance of corrosion... UNDERGROUND STORAGE TANKS (UST) General Operating Requirements § 280.31 Operation and maintenance of corrosion protection. All owners and operators of steel UST systems with corrosion protection must comply with the...

  18. Technical information report: Plasma melter operation, reliability, and maintenance analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hendrickson, D.W.

    1995-03-14

    This document provides a technical report of operability, reliability, and maintenance of a plasma melter for low-level waste vitrification, in support of the Hanford Tank Waste Remediation System (TWRS) Low-Level Waste (LLW) Vitrification Program. A process description is provided that minimizes maintenance and downtime and includes material and energy balances, equipment sizes and arrangement, startup/operation/maintence/shutdown cycle descriptions, and basis for scale-up to a 200 metric ton/day production facility. Operational requirements are provided including utilities, feeds, labor, and maintenance. Equipment reliability estimates and maintenance requirements are provided which includes a list of failure modes, responses, and consequences.

  19. 24 CFR 1006.325 - Maintenance, management and efficient operation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... § 1006.325 Maintenance, management and efficient operation. (a) Written policies. The DHHL must develop... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Maintenance, management and efficient operation. 1006.325 Section 1006.325 Housing and Urban Development Regulations Relating to Housing...

  20. Operation and maintenance cost data for residential photovoltaic modules/panels

    NASA Technical Reports Server (NTRS)

    Oster, J. R., Jr.; Zaremski, D. R., Jr.; Albert, E. M.; Hawkins, S. L.

    1980-01-01

    Costs associated with the operation and maintenance of residential photovoltaic modules and arrays are studied. Six basic topics related to operation and maintenance to photovoltaic arrays are investigated: maintenance; cleaning; panel replacement; gasket repair/replacement; wiring repair/replacement; and termination repair/replacement. The effects of the mounting types (rack mount, stand off mount, direct mount and integral mount) and the installation/replacement type (sequential, partial interruption and independent) are identified and described. Methods of reducing maintenance costs are suggested.

  1. Stabilization Pond Operation and Maintenance Manual.

    ERIC Educational Resources Information Center

    Sexauer, Willard N.; Karn, Roger V.

    This manual provides the waste stabilization pond operator with the basics necessary for the treatment of wastewater in stabilization ponds. The material is organized as a comprehensive guide that follows the normal operation and maintenance procedures from the time the wastewater enters the left station until it leaves the pond. A comprehensive…

  2. 78 FR 41810 - Proposed Revisions to Light Load Handling System and Operations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-11

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0148] Proposed Revisions to Light Load Handling System and... soliciting public comment on Section 9.1.4, ``Light Load Handling System and Operations'' of NUREG-0800... Federal Regulations (10 CFR) with respect to the light load handling system and related refueling...

  3. 49 CFR 192.605 - Procedural manual for operations, maintenance, and emergencies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... operations and maintenance activities are conducted. (b) Maintenance and normal operations. The manual... personnel to determine the effectiveness, and adequacy of the procedures used in normal operation and... or flow rate outside normal operating limits; (iii) Loss of communications; (iv) Operation of any...

  4. 47 CFR 73.1520 - Operation for tests and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 4 2014-10-01 2014-10-01 false Operation for tests and maintenance. 73.1520 Section 73.1520 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Rules Applicable to All Broadcast Stations § 73.1520 Operation for tests and maintenance. (a) Broadcast stations may be...

  5. 47 CFR 73.1520 - Operation for tests and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false Operation for tests and maintenance. 73.1520 Section 73.1520 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Rules Applicable to All Broadcast Stations § 73.1520 Operation for tests and maintenance. (a) Broadcast stations may be...

  6. 38th Annual Maintenance & Operations Cost Study for Colleges

    ERIC Educational Resources Information Center

    Agron, Joe

    2009-01-01

    The nation's colleges are feeling the pinch of the economic downturn, and maintenance and operations (M&O) budgets especially are under pressure. This article presents data from the 38th annual Maintenance & Operations Cost Study for colleges that can help one in benchmarking expenditures at one's institution. Data provided only targets two-year…

  7. 38th Annual Maintenance & Operations Cost Study for Schools

    ERIC Educational Resources Information Center

    Agron, Joe

    2009-01-01

    Despite the worst economic environment in generations, spending by K-12 institutions on maintenance and operations (M&O) held its own--defying historical trends that have shown M&O spending among the most affected in times of budget tightening. This article presents data from the 38th annual Maintenance & Operations Cost Study for…

  8. Life Cycle Costs in Education: Operations & Maintenance Considered.

    ERIC Educational Resources Information Center

    Moussatche, Helena; Languell-Urquhart, Jennifer; Woodson, Carol

    2000-01-01

    Discusses life cycle cost analysis when deciding on flooring finishes and examines operations and maintenance cost effectiveness relative to hard, resilient, and soft flooring. A chart of evaluated flooring materials' characteristics, appropriate maintenance procedures, and recommended frequency is included. (GR)

  9. ICD Complex Operations and Maintenance Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gibson, P. L.

    2007-06-25

    This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

  10. 14 CFR 171.325 - Maintenance and operations requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Maintenance and operations requirements. 171.325 Section 171.325 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... service. (7) Detailed and specific maintenance procedures and servicing guides stating the frequency of...

  11. 14 CFR 171.325 - Maintenance and operations requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Maintenance and operations requirements. 171.325 Section 171.325 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... service. (7) Detailed and specific maintenance procedures and servicing guides stating the frequency of...

  12. 14 CFR 171.325 - Maintenance and operations requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Maintenance and operations requirements. 171.325 Section 171.325 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... service. (7) Detailed and specific maintenance procedures and servicing guides stating the frequency of...

  13. 14 CFR 171.325 - Maintenance and operations requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Maintenance and operations requirements. 171.325 Section 171.325 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... service. (7) Detailed and specific maintenance procedures and servicing guides stating the frequency of...

  14. 14 CFR 171.325 - Maintenance and operations requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Maintenance and operations requirements. 171.325 Section 171.325 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... service. (7) Detailed and specific maintenance procedures and servicing guides stating the frequency of...

  15. 14 CFR 171.161 - Maintenance and operations requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... meet at a minimum the Federal Communications Commission's licensing requirements and show that he has the special knowledge and skills needed to maintain the facility, including proficiency in maintenance... facility. (2) Maintenance and operations by authorized persons only. (3) Federal Communications Commission...

  16. 14 CFR 171.161 - Maintenance and operations requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... meet at a minimum the Federal Communications Commission's licensing requirements and show that he has the special knowledge and skills needed to maintain the facility, including proficiency in maintenance... facility. (2) Maintenance and operations by authorized persons only. (3) Federal Communications Commission...

  17. 14 CFR 171.161 - Maintenance and operations requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... meet at a minimum the Federal Communications Commission's licensing requirements and show that he has the special knowledge and skills needed to maintain the facility, including proficiency in maintenance... facility. (2) Maintenance and operations by authorized persons only. (3) Federal Communications Commission...

  18. 14 CFR 171.161 - Maintenance and operations requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... meet at a minimum the Federal Communications Commission's licensing requirements and show that he has the special knowledge and skills needed to maintain the facility, including proficiency in maintenance... facility. (2) Maintenance and operations by authorized persons only. (3) Federal Communications Commission...

  19. Operations and maintenance plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    DOT National Transportation Integrated Search

    2014-01-01

    This Operations and Maintenance (O&M) Plan describes how the Integrated Corridor Management System (ICMS) will be used in daily transportation operations and maintenance activities. The Plan addresses the activities needed to effectively operate the ...

  20. The Development and Deployment of a Maintenance Operations Safety Survey.

    PubMed

    Langer, Marie; Braithwaite, Graham R

    2016-11-01

    Based on the line operations safety audit (LOSA), two studies were conducted to develop and deploy an equivalent tool for aircraft maintenance: the maintenance operations safety survey (MOSS). Safety in aircraft maintenance is currently measured reactively, based on the number of audit findings, reportable events, incidents, or accidents. Proactive safety tools designed for monitoring routine operations, such as flight data monitoring and LOSA, have been developed predominantly for flight operations. In Study 1, development of MOSS, 12 test peer-to-peer observations were collected to investigate the practicalities of this approach. In Study 2, deployment of MOSS, seven expert observers collected 56 peer-to-peer observations of line maintenance checks at four stations. Narrative data were coded and analyzed according to the threat and error management (TEM) framework. In Study 1, a line check was identified as a suitable unit of observation. Communication and third-party data management were the key factors in gaining maintainer trust. Study 2 identified that on average, maintainers experienced 7.8 threats (operational complexities) and committed 2.5 errors per observation. The majority of threats and errors were inconsequential. Links between specific threats and errors leading to 36 undesired states were established. This research demonstrates that observations of routine maintenance operations are feasible. TEM-based results highlight successful management strategies that maintainers employ on a day-to-day basis. MOSS is a novel approach for safety data collection and analysis. It helps practitioners understand the nature of maintenance errors, promote an informed culture, and support safety management systems in the maintenance domain. © 2016, Human Factors and Ergonomics Society.

  1. The Development and Deployment of a Maintenance Operations Safety Survey

    PubMed Central

    Langer, Marie; Braithwaite, Graham R.

    2016-01-01

    Objective: Based on the line operations safety audit (LOSA), two studies were conducted to develop and deploy an equivalent tool for aircraft maintenance: the maintenance operations safety survey (MOSS). Background: Safety in aircraft maintenance is currently measured reactively, based on the number of audit findings, reportable events, incidents, or accidents. Proactive safety tools designed for monitoring routine operations, such as flight data monitoring and LOSA, have been developed predominantly for flight operations. Method: In Study 1, development of MOSS, 12 test peer-to-peer observations were collected to investigate the practicalities of this approach. In Study 2, deployment of MOSS, seven expert observers collected 56 peer-to-peer observations of line maintenance checks at four stations. Narrative data were coded and analyzed according to the threat and error management (TEM) framework. Results: In Study 1, a line check was identified as a suitable unit of observation. Communication and third-party data management were the key factors in gaining maintainer trust. Study 2 identified that on average, maintainers experienced 7.8 threats (operational complexities) and committed 2.5 errors per observation. The majority of threats and errors were inconsequential. Links between specific threats and errors leading to 36 undesired states were established. Conclusion: This research demonstrates that observations of routine maintenance operations are feasible. TEM-based results highlight successful management strategies that maintainers employ on a day-to-day basis. Application: MOSS is a novel approach for safety data collection and analysis. It helps practitioners understand the nature of maintenance errors, promote an informed culture, and support safety management systems in the maintenance domain. PMID:27411354

  2. Process Management and Exception Handling in Multiprocessor Operating Systems Using Object-Oriented Design Techniques. Revised Sep. 1988

    NASA Technical Reports Server (NTRS)

    Russo, Vincent; Johnston, Gary; Campbell, Roy

    1988-01-01

    The programming of the interrupt handling mechanisms, process switching primitives, scheduling mechanism, and synchronization primitives of an operating system for a multiprocessor require both efficient code in order to support the needs of high- performance or real-time applications and careful organization to facilitate maintenance. Although many advantages have been claimed for object-oriented class hierarchical languages and their corresponding design methodologies, the application of these techniques to the design of the primitives within an operating system has not been widely demonstrated. To investigate the role of class hierarchical design in systems programming, the authors have constructed the Choices multiprocessor operating system architecture the C++ programming language. During the implementation, it was found that many operating system design concerns can be represented advantageously using a class hierarchical approach, including: the separation of mechanism and policy; the organization of an operating system into layers, each of which represents an abstract machine; and the notions of process and exception management. In this paper, we discuss an implementation of the low-level primitives of this system and outline the strategy by which we developed our solution.

  3. Operation and maintenance, fire rescue air-pack. Volume 2: Communications

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The operation and maintenance procedures are described for the development model of the fire rescue air pack (FRAP) voice amplifier assembly, including the battery charger. Operational instructions include a general description of the assembly, specifications, and installation and operation. Maintenance instructions include theory of operation, preventive maintenance, repair, adjustment, and a parts list. The FRAP is intended to permit fire rescue personnel to enter a smoke-filled, toxic or oxygen depleted environment carrying their own source of breathing air. The voice amplifier assembly permits the wearer to communicate by voice with other persons in the vicinity. The battery charger assembly provides a means of keeping the amplifier batteries fully charged.

  4. LACIE data-handling techniques

    NASA Technical Reports Server (NTRS)

    Waits, G. H. (Principal Investigator)

    1979-01-01

    Techniques implemented to facilitate processing of LANDSAT multispectral data between 1975 and 1978 are described. The data that were handled during the large area crop inventory experiment and the storage mechanisms used for the various types of data are defined. The overall data flow, from the placing of the LANDSAT orders through the actual analysis of the data set, is discussed. An overview is provided of the status and tracking system that was developed and of the data base maintenance and operational task. The archiving of the LACIE data is explained.

  5. Fluid Power Systems Maintenance and Operation. Instructor's Guide.

    ERIC Educational Resources Information Center

    Paule, Bob A.

    Written to complement the Fluid Power/Basic Hydraulic and Basic Pneumatics guides, this curriculum guide contains materials for a seven-unit course in fluid power systems maintenance and operation. Units, which consist of one to eight lessons, cover these topics: preventive maintenance, repair machine malfunctions, overhaul/recondition hydraulic…

  6. Operations and Maintenance February Newsletter | Poster

    Cancer.gov

    Resource management in the form of “outsourcing” continues to be a valuable tool for the Operations and Maintenance (O&M) department. The O&M department uses this resource as an integral part of its approach to customer service.

  7. 32 CFR 553.13 - Standards of construction, maintenance, and operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 32 National Defense 3 2014-07-01 2014-07-01 false Standards of construction, maintenance, and operations. 553.13 Section 553.13 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY..., maintenance, and operations. The following standards of the Department of the Army will be observed in the...

  8. Spent fuel cask handling at an operating nuclear power plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pal, A.C.

    1988-01-01

    The importance of spent fuel handling at operating nuclear power plants cannot be overstated. Because of its highly radioactive nature, however, spent fuel must be handled in thick, lead-lined containers or casks. Thus, all casks for spent fuel handling are heavy loads by the US Nuclear Regulatory Commission's definition, and any load-drop must be evaluated for its potential to damage safety-related equipment. Nuclear Regulatory Guide NUREG-0612 prescribes the regulatory requirements of alternative heavy-load-handling methodologies such as (a) by providing cranes that meet the requirements of NUREG-0554, which shall be called the soft path, or (b) by providing protective devices atmore » all postulated load-drop areas to prevent any damage to safety-related equipment, which shall be called the hard path. The work reported in this paper relates to cask handling at New York Power Authority's James A. FitzPatrick (JAF) plant.« less

  9. Maintenance & construction operations user service : an addendum to the ITS program plan

    DOT National Transportation Integrated Search

    2001-01-26

    The Maintenance and Construction Operations User Service describes the need for integrating key activities. Generally, key Maintenance and Construction Operations (MCO) activities include monitoring, operating, maintaining, improving, and managing th...

  10. Risk mitigation strategies for operations and maintenance activities.

    DOT National Transportation Integrated Search

    2012-04-01

    The objective of this research was to investigate the application of integrated risk modeling to operations and maintenance activities, specifically moving operations, such as pavement testing, pavement marking, painting, snow removal, shoulder work,...

  11. 34 CFR 75.615 - Operation and maintenance by the grantee.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 1 2014-07-01 2014-07-01 false Operation and maintenance by the grantee. 75.615 Section 75.615 Education Office of the Secretary, Department of Education DIRECT GRANT PROGRAMS What Conditions Must Be Met by a Grantee? Construction § 75.615 Operation and maintenance by the grantee. A...

  12. Maintenance Performance System (Organizational). Operating Manual Maintenance Management Information System for Division 86

    DTIC Science & Technology

    1984-01-01

    performance, diagnosing performance problems, taking corrective actions, and providing training. This report provides instructions for operating the maintenance management information system of MPS-O.

  13. Value centric approaches to the design, operations and maintenance of wind turbines

    NASA Astrophysics Data System (ADS)

    Khadabadi, Madhur Aravind

    Wind turbine maintenance is emerging as an unexpectedly high component of turbine operating cost, and there is an increasing interest in managing this cost. This thesis presents an alternative view of maintenance as a value-driver, and develops an optimization algorithm to evaluate the value delivered by different maintenance techniques. I view maintenance as an operation that moves the turbine to an improved state in which it can generate more power and, thus, earn more revenue. To implement this approach, I model the stochastic deterioration of the turbine in two dimensions: the deterioration rate, and the extent of deterioration, and then use maintenance to improve the state of the turbine. The value of the turbine is the difference between the revenue from to the power generation and the costs incurred in operation and maintenance. With a focus on blade deterioration, I evaluate the value delivered by implementing two different maintenance schemes, predictive maintenance and scheduled maintenance. An example of predictive maintenance technique is the use of Condition Monitoring Systems to precisely detect deterioration. I model Condition Monitoring System (CMS) of different degrees of fidelity, where a higher fidelity CMS would allow the blade state to be determined with a higher precision. The same model is then applied for the scheduled maintenance technique. The improved state information obtained from these techniques is then used to derive an optimal maintenance strategy. The difference between the value of the turbine with and without the inspection type can be interpreted as the value of the inspection. The results indicate that a higher fidelity (and more expensive) inspection method does not necessarily yield the highest value, and, that there is an optimal level of fidelity that results in maximum value. The results also aim to inform the operator of the impact of regional parameters such as wind speed, variance and maintenance costs to the optimal

  14. 76 FR 63714 - Big Spring Rail System, Inc.;Operation Exemption;Transport Handling Specialists, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-13

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35553] Big Spring Rail System, Inc.;Operation Exemption;Transport Handling Specialists, Inc. Big Spring Rail System, Inc. (BSRS...., owned by the City of Big Spring, Tex. (City). BSRS will be operating the line for Transport Handling...

  15. 36th Annual Maintenance & Operations Cost Study: Colleges

    ERIC Educational Resources Information Center

    Agron, Joe

    2007-01-01

    Colleges are focusing increased effort--and money--to improve the physical condition of existing facilities and address a huge backlog of deferred maintenance. According to "American School & University's" 36th annual Maintenance and Operations (M&O) Cost Study, the median college spends 16.4% of total college budget on M&O, up from 11% the year…

  16. Understanding Skill in EVA Mass Handling. Volume 1; Theoretical and Operational Foundations

    NASA Technical Reports Server (NTRS)

    Riccio, Gary; McDonald, Vernon; Peters, Brian; Layne, Charles; Bloomberg, Jacob

    1997-01-01

    This report describes the theoretical and operational foundations for our analysis of skill in extravehicular mass handling. A review of our research on postural control, human-environment interactions, and exploratory behavior in skill acquisition is used to motivate our analysis. This scientific material is presented within the context of operationally valid issues concerning extravehicular mass handling. We describe the development of meaningful empirical measures that are relevant to a special class of nested control systems: manual interactions between an individual and the substantial environment. These measures are incorporated into a unique empirical protocol implemented on NASA's principal mass handling simulator, the precision air-bearing floor, in order to evaluate skill in extravehicular mass handling. We discuss the components of such skill with reference to the relationship between postural configuration and controllability of an orbital replacement unit, the relationship between orbital replacement unit control and postural stability, the relationship between antecedent and consequent movements of an orbital replacement unit, and the relationship between antecedent and consequent postural movements. Finally, we describe our expectations regarding the operational relevance of the empirical results as it pertains to extravehicular activity tools, training, monitoring, and planning.

  17. Maintenance Free Fluidic Transfer and Mixing Devices for Highly Radioactive Applications - Design, Development, Deployment and Operational Experience

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Phillips, C.; Richardson, J. E.; Fallows, P.

    2006-07-01

    Power Fluidics is the generic name for a range of maintenance-free fluid transfer and mixing devices, capable of handling a wide range of highly radioactive fluids, jointly developed by British Nuclear Group, its US-based subsidiary BNG America, and AEA Technology. Power Fluidic devices include Reverse Flow Diverters (RFDs), Vacuum Operated Slug Lifts (VOSLs), and Air Lifts, all of which have an excellent proven record for pumping radioactive liquids and sludges. Variants of the RFD, termed Pulse Jet Mixers (PJMs) are used to agitate and mix tank contents, where maintenance-free equipment is desirable, and where a high degree of homogenization ismore » necessary. The equipment is designed around the common principle of using compressed air to provide the motive force to transfer liquids and sludges. These devices have no moving parts in contact with the radioactive medium and therefore require no maintenance in radioactive areas of processing plants. Once commissioned, Power Fluidic equipment has been demonstrated to operate for the life of the facility. Over 800 fluidic devices continue to operate safely and reliably in British Nuclear Group's nuclear facilities at the Sellafield site in the United Kingdom, and some of these have done so for almost 40 years. More than 400 devices are being supplied by AEA Technology and BNG America for the Waste Treatment Plant (WTP) at the Hanford Site in southeastern Washington State, USA. This paper discusses: - Principles of operation of fluidic pumps and mixers. - Selection criteria and design of fluidic pumps and mixers. - Operational experience of fluidic pumps and mixers in the United Kingdom. - Applications of fluidic pumps and mixers at the U.S. Department of Energy nuclear sites. (authors)« less

  18. How the Station will operate. [operation, management, and maintenance in space

    NASA Technical Reports Server (NTRS)

    Cox, John T.

    1988-01-01

    Aspects of the upcoming operational phase of the Space Station (SS) are examined. What the crew members will do with their time in their specialized roles is addressed. SS maintenance and servicing and the interaction of the SS Control Center with Johnson Space Center is discussed. The planning of payload operations and strategic planning for the SS are examined.

  19. Ninth Annual Maintenance & Operations Cost Study.

    ERIC Educational Resources Information Center

    American School and University, 1980

    1980-01-01

    School districts during 1979-80 were faced with a dramatic reallocation of maintenance and operations funds from salaries (a 25 percent reduction from that budgeted) to cover energy costs, with the balance used in a discretionary manner to purchase equipment and supplies and contract salaries as the year evolved. (Author/MLF)

  20. Intelligent Operation and Maintenance of Micro-grid Technology and System Development

    NASA Astrophysics Data System (ADS)

    Fu, Ming; Song, Jinyan; Zhao, Jingtao; Du, Jian

    2018-01-01

    In order to achieve the micro-grid operation and management, Studying the micro-grid operation and maintenance knowledge base. Based on the advanced Petri net theory, the fault diagnosis model of micro-grid is established, and the intelligent diagnosis and analysis method of micro-grid fault is put forward. Based on the technology, the functional system and architecture of the intelligent operation and maintenance system of micro-grid are studied, and the microcomputer fault diagnosis function is introduced in detail. Finally, the system is deployed based on the micro-grid of a park, and the micro-grid fault diagnosis and analysis is carried out based on the micro-grid operation. The system operation and maintenance function interface is displayed, which verifies the correctness and reliability of the system.

  1. Nautical Education for Offshore Extractive Industries. Support Operations & Seamanship.

    ERIC Educational Resources Information Center

    Hoffmann, G. L.

    This training manual is intended for persons who will be employed on supply vessels or towboats which support ocean-based oil extraction operations. The text deals with the basic skills of marine towing procedures, boat handling, deck maintenance, cargo operations, and rope and wire handling. Additional sections treat the proper attitude of a…

  2. Grain Handling and Storage.

    ERIC Educational Resources Information Center

    Harris, Troy G.; Minor, John

    This text for a secondary- or postecondary-level course in grain handling and storage contains ten chapters. Chapter titles are (1) Introduction to Grain Handling and Storage, (2) Elevator Safety, (3) Grain Grading and Seed Identification, (4) Moisture Control, (5) Insect and Rodent Control, (6) Grain Inventory Control, (7) Elevator Maintenance,…

  3. Operation and maintenance results from ISFOC CPV plants

    NASA Astrophysics Data System (ADS)

    Gil, Eduardo; Martinez, María; de la Rubia, Oscar

    2017-09-01

    The analysis of field operation and maintenance data collected during a period of over eight years, from CPV installations consisting of three different CPV technologies (including second generation of one of these technologies), has allowed us to get valuable information about the long-term degradation of the CPV systems. Through the study of the maintenance control ratio previously defined and by applying the root cause analysis methodology, the components responsible for the most unplanned interventions for each technology were identified. Focusing maintenance efforts on these components, a reduction of the unplanned interventions and the total cost of maintenance has been achieved over the years. Therefore, the deployment of an effective maintenance plan, identifying critical components, is essential to minimize the risk for investors and maximize the CPV power plants lifetime and energy output, increasing the availability of CPV installations, boosting market confidence in CPV systems.

  4. Alternative Maintenance Organization Structures for Operational Wings

    DTIC Science & Technology

    1988-01-01

    MAINTENANCE ORGANIZATION STRUCTURES FOR OPERATIONAL WINGS MAJOR STANLEY L. JUSTICE 88-140 "’insights in to tomorrow" A I 1 8 9 12 29 0 61 DISCLAIMER The...STRUCTURES FOR OPERATIONAL WINGS 12 . PERSONAL AUTHOR(S) Justice, Stanley L., Major, USAF 13a. TYPE OF REPORT 13b. TIME COVERED 14. DATE OF REPORT (Year...Military Airlift Command (MAC) ...................... 12 Mainitenance Organizatior .......................... 12 Advantages/Disadvantages

  5. Coping with coal quality impacts on power plant operation and maintenance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hatt, R.

    1998-12-31

    The electric power industry is rapidly changing due to deregulation. The author was present one hot day in June of this year, when a southeastern utility company was selling electricity for $5,000.00 per megawatt with $85.00 cost. Typical power cost range from the mid teens at night to about $30.00 on a normal day. The free market place will challenge the power industry in many ways. Fuel is the major cost in electric power. In a regulated industry the cost of fuel was passed on to the customers. Fuels were chosen to minimize problems such as handling, combustion, ash depositsmore » and other operational and maintenance concerns. Tight specifications were used to eliminate or minimize coals that caused problems. These tight specifications raised the price of fuel by minimizing competition. As the power stations become individual profit centers, plant management must take a more proactive role in fuel selection. Understanding how coal quality impacts plant performance and cost, allows better fuel selection decisions. How well plants take advantage of their knowledge may determine whether they will be able to compete in a free market place. The coal industry itself can provide many insights on how to survive in this type of market. Coal mines today must remain competitive or be shut down. The consolidation of the coal industry indicates the trends that can occur in a competitive market. These trends have already started, and will continue in the utility industry. This paper will discuss several common situations concerning coal quality and potential solutions for the plant to consider. All these examples have mill maintenance and performance issues in common. This is indicative of how important pulverizers are to the successful operation of a power plant.« less

  6. 40 CFR 63.1187 - What do I need to know about operations, maintenance, and monitoring plans?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operations, maintenance, and monitoring plans? 63.1187 Section 63.1187 Protection of Environment... about operations, maintenance, and monitoring plans? (a) An operations, maintenance, and monitoring plan... title V permit. (b) The operations, maintenance, and monitoring plan must include the following: (1...

  7. 10-MWe solar-thermal central-receiver pilot plant. Operating and maintenance manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1979-08-01

    Information required to perform the initial program loading and operation of the Heliostat Array Controller (HAC) is provided. Operating activities are described as required for heliostat control. All computer console command steps, from power up to power down are described. Detailed steps are provided to wake up the system and direct heliostat beams to standby, on target, standby to stow and power down. Maintenance requirements (preventive and corrective), reparability (reparable - non-reparable decisions), spares identification, spares storage location, replacement levels, replacement location and repair location are established. Individual system breakdown block diagrams are provided for each system/assembly/subassembly. Maintenance and repairmore » description sheets are provided for each maintenance significant item. The manual provides support of the following equipment: (a) helostat assembly; (b) heliostat control assembly; and (c) maintenance and installation equipment. The safety requirements for the operating and maintenance functions are established. These procedures will assist in eliminating or controlling the accident potentials caused by human error, environment, or component malfunctions or interactions that could result in major injury or fatality to operating or visiting personnel, or damage to subsystem components or support equipment. These procedures are for normal and test operating conditions and emergency situations, and apply to all Martin Marietta Corporation, governmental, operating and visitor personnel. (LEW)« less

  8. Development the conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation

    NASA Astrophysics Data System (ADS)

    Milana; Khan, M. K.; Munive, J. E.

    2014-07-01

    The importance of maintenance has escalated significantly by the increasing of automation in manufacturing process. This condition switches traditional maintenance perspective of inevitable cost into the business competitive driver. Consequently, maintenance strategy and operation decision needs to be synchronized to business and manufacturing concerns. This paper shows the development of conceptual design of Knowledge Based System for Integrated Maintenance Strategy and Operation (KBIMSO). The framework of KBIMSO is elaborated to show the process of how the KBIMSO works to reach the maintenance decision. By considering the multi-criteria of maintenance decision making, the KB system embedded with GAP and AHP to support integrated maintenance strategy and operation which is novel in this area. The KBIMSO is useful to review the existing maintenance system and give reasonable recommendation of maintenance decisions in respect to business and manufacturing perspective.

  9. Identifying Human Factors Issues in Aircraft Maintenance Operations

    NASA Technical Reports Server (NTRS)

    Veinott, Elizabeth S.; Kanki, Barbara G.; Shafto, Michael G. (Technical Monitor)

    1995-01-01

    Maintenance operations incidents submitted to the Aviation Safety Reporting System (ASRS) between 1986-1992 were systematically analyzed in order to identify issues relevant to human factors and crew coordination. This exploratory analysis involved 95 ASRS reports which represented a wide range of maintenance incidents. The reports were coded and analyzed according to the type of error (e.g, wrong part, procedural error, non-procedural error), contributing factors (e.g., individual, within-team, cross-team, procedure, tools), result of the error (e.g., aircraft damage or not) as well as the operational impact (e.g., aircraft flown to destination, air return, delay at gate). The main findings indicate that procedural errors were most common (48.4%) and that individual and team actions contributed to the errors in more than 50% of the cases. As for operational results, most errors were either corrected after landing at the destination (51.6%) or required the flight crew to stop enroute (29.5%). Interactions among these variables are also discussed. This analysis is a first step toward developing a taxonomy of crew coordination problems in maintenance. By understanding what variables are important and how they are interrelated, we may develop intervention strategies that are better tailored to the human factor issues involved.

  10. Guide for preparing active solar heating systems operation and maintenance manuals

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-01-01

    This book presents a systematic and standardized approach to the preparation of operation and maintenance manuals for active solar heating systems. Provides an industry consensus of the best operating and maintenance procedures for large commercial-scale solar service water and space heating systems. A sample O M manual is included. 3-ring binder included.

  11. Water Distribution System Operation and Maintenance. A Field Study Training Program. Second Edition.

    ERIC Educational Resources Information Center

    Kerri, Kenneth D.; And Others

    Proper installation, inspection, operation, maintenance, repair and management of water distribution systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide water distribution system operators with the knowledge and skills required to operate and maintain…

  12. 49 CFR 193.2707 - Operations and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... (c) Corrosion control procedures under § 193.2605(b), including those for the design, installation, operation, and maintenance of cathodic protection systems, must be carried out by, or under the direction of, a person qualified by experience and training in corrosion control technology. ...

  13. 49 CFR 193.2707 - Operations and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... (c) Corrosion control procedures under § 193.2605(b), including those for the design, installation, operation, and maintenance of cathodic protection systems, must be carried out by, or under the direction of, a person qualified by experience and training in corrosion control technology. ...

  14. Electric Motors Maintenance Planning From Its Operating Variables

    NASA Astrophysics Data System (ADS)

    Rodrigues, Francisco; Fonseca, Inácio; Farinha, José Torres; Ferreira, Luís; Galar, Diego

    2017-09-01

    The maintenance planning corresponds to an approach that seeks to maximize the availability of equipment and, consequently, increase the levels of competitiveness of companies by increasing production times. This paper presents a maintenance planning based on operating variables (number of hours worked, duty cycles, number of revolutions) to maximizing the availability of operation of electrical motors. The reading of the operating variables and its sampling is done based on predetermined sampling cycles and subsequently is made the data analysis through time series algorithms aiming to launch work orders before reaching the variables limit values. This approach is supported by tools and technologies such as logical applications that enable a graphical user interface for access to relevant information about their Physical Asset HMI (Human Machine Interface), including the control and supervision by acquisition through SCADA (Supervisory Control And data acquisition) data, also including the communication protocols among different logical applications.

  15. Process technology and effects of spallation products: Circuit components, maintenance, and handling

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sigg, B.; Haines, S.J.; Dressler, R.

    1996-06-01

    Working Session D included an assessment of the status of the technology and components required to: (1) remove impurities from the liquid metal (mercury or Pb-Bi) target flow loop including the effects of spallation products, (2) provide the flow parameters necessary for target operations, and (3) maintain the target system. A series of brief presentations were made to focus the discussion on these issues. The subjects of these presentations, and presenters were: (1) Spallation products and solubilities - R. Dressler; (2) Spallation products for Pb-Bi - Y. Orlov; (3) Clean/up/impurity removal components - B. Sigg; (4) {open_quotes}Road-Map{close_quotes} and remote handlingmore » needs - T. McManamy; (5) Remote handling issues and development - M. Holding. The overall conclusion of this session was that, with the exception of (i) spallation product related processing issues, (ii) helium injection and clean-up, and (iii) specialized remote handling equipment, the technology for all other circuit components (excluding the target itself) exists. Operating systems at the Institute of Physics in Riga, Latvia (O. Lielausis) and at Ben-Gurion University in Beer Shiva, Israel (S. Lesin) have demonstrated that other liquid metal circuit components including pumps, heat exchangers, valves, seals, and piping are readily available and have been reliably used for many years. In the three areas listed above, the designs and analysis are not judged to be mature enough to determine whether and what types of technology development are required. Further design and analysis of the liquid metal target system is therefore needed to define flow circuit processing and remote handling equipment requirements and thereby identify any development needs.« less

  16. Small Water System Operations and Maintenance. A Field Study Training Program. Second Edition.

    ERIC Educational Resources Information Center

    Kerri, Kenneth D.; And Others

    Proper installation, inspection, operation, maintenance, repair and management of small water systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide small water system operators with the knowledge and skills required to operate and maintain these systems…

  17. WASTE HANDLING BUILDING VENTILATION SYSTEM DESCRIPTION DOCUMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    P.A. Kumar

    2000-06-21

    The Waste Handling Building Ventilation System provides heating, ventilation, and air conditioning (HVAC) for the contaminated, potentially contaminated, and uncontaminated areas of the Monitored Geologic Repository's (MGR) Waste Handling Building (WHB). In the uncontaminated areas, the non-confinement area ventilation system maintains the proper environmental conditions for equipment operation and personnel comfort. In the contaminated and potentially contaminated areas, in addition to maintaining the proper environmental conditions for equipment operation and personnel comfort, the contamination confinement area ventilation system directs potentially contaminated air away from personnel in the WHB and confines the contamination within high-efficiency particulate air (HEPA) filtration units. Themore » contamination confinement areas ventilation system creates airflow paths and pressure zones to minimize the potential for spreading contamination within the building. The contamination confinement ventilation system also protects the environment and the public by limiting airborne releases of radioactive or other hazardous contaminants from the WHB. The Waste Handling Building Ventilation System is designed to perform its safety functions under accident conditions and other Design Basis Events (DBEs) (such as earthquakes, tornadoes, fires, and loss of the primary electric power). Additional system design features (such as compartmentalization with independent subsystems) limit the potential for cross-contamination within the WHB. The system provides status of important system parameters and equipment operation, and provides audible and/or visual indication of off-normal conditions and equipment failures. The Waste Handling Building Ventilation System confines the radioactive and hazardous material within the building such that the release rates comply with regulatory limits. The system design, operations, and maintenance activities incorporate ALARA (as low as is

  18. Operations and Maintenance June Newsletter | Poster

    Cancer.gov

    The Operations and Maintenance (O&M) Department provides the “Help Desk” as a valuable resource to both our internal and external customers. Our talented and knowledgeable staff are available to assist with a wide variety of questions, concerns, or issues. Please read below for a better understanding of the services provided as well as some tips (including what information is

  19. Operations and Maintenance April Newsletter | Poster

    Cancer.gov

    Summertime is coming and with it warmer temperatures, so get out there and enjoy it. The Operations and Maintenance (O&M) department has talented individuals dedicated to maintaining your air conditioning equipment for maximum efficiency. Our staff are always ready to address issues even in the dog days of summer. Please be assured that we are working diligently to keep you

  20. Operations and Maintenance April Newsletter | Poster

    Cancer.gov

    Summertime is coming and with it warmer temperatures, so get out there and enjoy it. The Operations and Maintenance (O&M) department has talented individuals dedicated to maintaining your air conditioning equipment for maximum efficiency. Our staff are always ready to address issues even in the dog days of summer. Please be assured that we are working diligently to keep you comfortable.

  1. OPERATION AND MAINTENANCE MANUAL FOR ELECTROSTATIC PRECIPITATORS

    EPA Science Inventory

    The manual focuses on the operation and maintenance (O/M) of typical electrostatic precipitators (ESPs). It summarizes available information on theory and design in sufficient detail to provide a basic background O/M portions of the manual. Although O/M-related air pollution prob...

  2. Operation and maintenance manual for a preprototype Sabatier carbon dioxide reduction subsystem

    NASA Technical Reports Server (NTRS)

    Kleiner, G. N.

    1981-01-01

    The manual delineates the procedures, precautions and necessary sequences of steps required to prepare the package for test, provide troubleshooting information and perform required maintenance by the operating crew. The manual is divided into five sections: Installation, Checkout, Operation, Failure Detection/Isolation and Maintenance.

  3. 40 CFR 63.1347 - Operation and maintenance plan requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants From the Portland Cement Manufacturing Industry Emission Standards and Operating Limits § 63.1347 Operation and maintenance plan requirements. (a...

  4. 40 CFR 63.1347 - Operation and maintenance plan requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES National Emission Standards for Hazardous Air Pollutants From the Portland Cement Manufacturing Industry Emission Standards and Operating Limits § 63.1347 Operation and maintenance plan requirements. (a) You must...

  5. 40 CFR 63.1347 - Operation and maintenance plan requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES National Emission Standards for Hazardous Air Pollutants From the Portland Cement Manufacturing Industry Emission Standards and Operating Limits § 63.1347 Operation and maintenance plan requirements. (a) You must...

  6. 40 CFR 63.1347 - Operation and maintenance plan requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants From the Portland Cement Manufacturing Industry Emission Standards and Operating Limits § 63.1347 Operation and maintenance plan requirements. (a...

  7. 40 CFR 763.91 - Operations and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CONTROL ACT ASBESTOS Asbestos-Containing Materials in Schools § 763.91 Operations and maintenance. (a... protection. Local education agencies must comply with either the OSHA Asbestos Construction Standard at 29 CFR 1926.1101, or the Asbestos Worker Protection Rule at 40 CFR 763.120, whichever is applicable. (c...

  8. 40 CFR 763.91 - Operations and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CONTROL ACT ASBESTOS Asbestos-Containing Materials in Schools § 763.91 Operations and maintenance. (a... protection. Local education agencies must comply with either the OSHA Asbestos Construction Standard at 29 CFR 1926.1101, or the Asbestos Worker Protection Rule at 40 CFR 763.120, whichever is applicable. (c...

  9. 40 CFR 763.91 - Operations and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CONTROL ACT ASBESTOS Asbestos-Containing Materials in Schools § 763.91 Operations and maintenance. (a... protection. Local education agencies must comply with either the OSHA Asbestos Construction Standard at 29 CFR 1926.1101, or the Asbestos Worker Protection Rule at 40 CFR 763.120, whichever is applicable. (c...

  10. 40 CFR 763.91 - Operations and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CONTROL ACT ASBESTOS Asbestos-Containing Materials in Schools § 763.91 Operations and maintenance. (a... protection. Local education agencies must comply with either the OSHA Asbestos Construction Standard at 29 CFR 1926.1101, or the Asbestos Worker Protection Rule at 40 CFR 763.120, whichever is applicable. (c...

  11. 40 CFR 763.91 - Operations and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... CONTROL ACT ASBESTOS Asbestos-Containing Materials in Schools § 763.91 Operations and maintenance. (a... protection. Local education agencies must comply with either the OSHA Asbestos Construction Standard at 29 CFR 1926.1101, or the Asbestos Worker Protection Rule at 40 CFR 763.120, whichever is applicable. (c...

  12. EFAB Report: Green Infrastructure Operations and Maintenance Finance

    EPA Pesticide Factsheets

    In this report, EFAB defines green infrastructure, outlines the benefits of green infrastructure, introduces green infrastructure operations and maintenance costs, and identifies and evaluates diverse ways to fund/finance green infrastructure O&M costs.

  13. 43 CFR 426.23 - Recovery of operation and maintenance (O&M) costs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... operation and maintenance (O&M) costs. (a) General. All new, amended, and renewed contracts shall provide... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Recovery of operation and maintenance (O&M) costs. 426.23 Section 426.23 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF...

  14. The construction of power grid operation index system considering the risk of maintenance

    NASA Astrophysics Data System (ADS)

    Tang, Jihong; Wang, Canlin; Jiang, Xinfan; Ye, Jianhui; Pan, Feilai

    2018-02-01

    In recent years, large-scale blackout occurred at home and abroad caused widespread concern about the operation of the grid in the world, and the maintenance risk is an important indicator of grid safety. The barrier operation of the circuit breaker exists in the process of overhaul of the power grid. The operation of the different barrier is of great significance to the change of the power flow, thus affecting the safe operation of the system. Most of the grid operating status evaluation index system did not consider the risk of maintenance, to this end, this paper from the security, economy, quality and cleanliness of the four angles, build the power grid operation index system considering the risk of maintenance.

  15. Modeling and Simulation of HVAC Faulty Operations and Performance Degradation due to Maintenance Issues

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wang, Liping; Hong, Tianzhen

    Almost half of the total energy used in the U.S. buildings is consumed by heating, ventilation and air conditionings (HVAC) according to EIA statistics. Among various driving factors to energy performance of building, operations and maintenance play a significant role. Many researches have been done to look at design efficiencies and operational controls for improving energy performance of buildings, but very few study the impacts of HVAC systems maintenance. Different practices of HVAC system maintenance can result in substantial differences in building energy use. If a piece of HVAC equipment is not well maintained, its performance will degrade. If sensorsmore » used for control purpose are not calibrated, not only building energy usage could be dramatically increased, but also mechanical systems may not be able to satisfy indoor thermal comfort. Properly maintained HVAC systems can operate efficiently, improve occupant comfort, and prolong equipment service life. In the paper, maintenance practices for HVAC systems are presented based on literature reviews and discussions with HVAC engineers, building operators, facility managers, and commissioning agents. We categorize the maintenance practices into three levels depending on the maintenance effort and coverage: 1) proactive, performance-monitored maintenance; 2) preventive, scheduled maintenance; and 3) reactive, unplanned or no maintenance. A sampled list of maintenance issues, including cooling tower fouling, boiler/chiller fouling, refrigerant over or under charge, temperature sensor offset, outdoor air damper leakage, outdoor air screen blockage, outdoor air damper stuck at fully open position, and dirty filters are investigated in this study using field survey data and detailed simulation models. The energy impacts of both individual maintenance issue and combined scenarios for an office building with central VAV systems and central plant were evaluated by EnergyPlus simulations using three approaches: 1

  16. How to Handle a Satellite Change in an Operational TWSTFT Network?

    DTIC Science & Technology

    2010-11-01

    42 nd Annual Precise Time and Time Interval (PTTI) Meeting 285 HOW TO HANDLE A SATELLITE CHANGE IN AN OPERATIONAL TWSTFT NETWORK...way satellite time and frequency transfer ( TWSTFT ) is a powerful technique because of its real-time capabilities. In principle, the time difference...between remote clocks is almost instantaneously known after a measurement session. Long-term TWSTFT operations have required changes between

  17. 33 CFR 159.57 - Installation, operation, and maintenance instructions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Installation, operation, and....57 Installation, operation, and maintenance instructions. (a) The instructions supplied by the manufacturer must contain directions for each of the following: (1) Installation of the device in a manner that...

  18. Maintenance and operations cost model for DSN subsystems

    NASA Technical Reports Server (NTRS)

    Burt, R. W.; Lesh, J. R.

    1977-01-01

    A procedure is described which partitions the recurring costs of the Deep Space Network (DSN) over the individual DSN subsystems. The procedure results in a table showing the maintenance, operations, sustaining engineering and supportive costs for each subsystems.

  19. Installation, Operation, and Operator's Maintenance of Diesel-Engine-Driven Generator Sets.

    ERIC Educational Resources Information Center

    Marine Corps Inst., Washington, DC.

    This student guide, one of a series of correspondence training courses designed to improve the job performance of members of the Marine Corps, contains three study units dealing with the skills needed by individuals responsible for the installation, operation, and maintenance of diesel engine-driven generator sets. The first two units cover…

  20. 43 CFR 426.23 - Recovery of operation and maintenance (O&M) costs.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Recovery of operation and maintenance (O&M... operation and maintenance (O&M) costs. (a) General. All new, amended, and renewed contracts shall provide for payment of O&M costs as specified in this section. (b) Amount of O&M costs a district must pay if...

  1. RTEMS CENTRE- Support and Maintenance CENTRE to RTEMS Operating System

    NASA Astrophysics Data System (ADS)

    Silva, H.; Constantino, A.; Coutunho, M.; Freitas, D.; Faustino, S.; Mota, M.; Colaço, P.; Zulianello, M.

    2008-08-01

    RTEMS stands for Real-Time Operating System for Multiprocessor Systems. It is a full featured Real Time Operating System that supports a variety of open APIs and interface standards. It provides a high performance environment for embedded applications, including a fixed-priority preemptive/non-preemptive scheduler, a comprehensive set of multitasking operations and a large range of supported architectures. Support and maintenance CENTRE to RTEMS operating system (RTEMS CENTRE) is a joint initiative of ESA-Portugal Task force, aiming to build a strong technical competence in the space flight (on- board) software, to offer support, maintenance and improvements to RTEMS. This paper provides a high level description of the current and future activities of the RTEMS CENTRE. It presents a brief description of the RTEMS operating system, a description of the tools developed and distributed to the community [1] and the improvements to be made to the operating system, including facilitation for the qualification of RTEMS (4.8.0) [2] for the space missions.

  2. On-Orbit Maintenance Operations Strategy for the International Space Station - Concept and Implementation

    NASA Technical Reports Server (NTRS)

    Patterson, Linda P.

    2001-01-01

    The International Space Station (ISS) has an operational mission and profile that makes it a Logistics and Maintenance (L&M) support challenge different from previous programs. It is permanently manned, assembled on orbit, and multi-national. With this technical and operational challenge, a unique approach is needed to support the hardware and crew. The key is the integration of on-orbit and ground analysis, supply, maintenance, and crew training into a coherent functional process that supports ISS goals and objectives. To integrate all the necessary aspects of hardware and personnel to support on-orbit maintenance, a myriad of products and processes must be created and coordinated, such that the right resources are in the right place at the right time to ensure continued ISS functionality. This paper will familiarize the audience with ISS On-Orbit Maintenance (OOM) concepts and capabilities for different maintenance tasks and discuss some of the logic behind their selection. It will also identify the operational maintenance support responsibility split between the U.S. and the various International Partners (IPs).

  3. 14 CFR 171.211 - Maintenance and operations requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Communications Commission's licensing requirements and show that he has the special knowledge and skills needed... persons only. (3) Federal Communications Commission's requirements for operating and maintenance personnel... Federal Communications Commission, and must not allow any modification to be made without specific...

  4. 14 CFR 171.211 - Maintenance and operations requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Communications Commission's licensing requirements and show that he has the special knowledge and skills needed... persons only. (3) Federal Communications Commission's requirements for operating and maintenance personnel... Federal Communications Commission, and must not allow any modification to be made without specific...

  5. 14 CFR 171.211 - Maintenance and operations requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Communications Commission's licensing requirements and show that he has the special knowledge and skills needed... persons only. (3) Federal Communications Commission's requirements for operating and maintenance personnel... Federal Communications Commission, and must not allow any modification to be made without specific...

  6. 14 CFR 171.211 - Maintenance and operations requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Communications Commission's licensing requirements and show that he has the special knowledge and skills needed... persons only. (3) Federal Communications Commission's requirements for operating and maintenance personnel... Federal Communications Commission, and must not allow any modification to be made without specific...

  7. 49 CFR 229.315 - Operations and maintenance manual.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Operations and maintenance manual. 229.315 Section 229.315 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD LOCOMOTIVE SAFETY STANDARDS Locomotive Electronics § 229...

  8. 49 CFR 229.315 - Operations and maintenance manual.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Operations and maintenance manual. 229.315 Section 229.315 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD LOCOMOTIVE SAFETY STANDARDS Locomotive Electronics § 229...

  9. 49 CFR 229.315 - Operations and maintenance manual.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Operations and maintenance manual. 229.315 Section 229.315 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAILROAD LOCOMOTIVE SAFETY STANDARDS Locomotive Electronics § 229...

  10. 14 CFR 171.211 - Maintenance and operations requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Communications Commission's licensing requirements and show that he has the special knowledge and skills needed... persons only. (3) Federal Communications Commission's requirements for operating and maintenance personnel... Federal Communications Commission, and must not allow any modification to be made without specific...

  11. Operations & Maintenance Best Practices - A Guide to Achieving Operational Efficiency (Release 3)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sullivan, Greg; Pugh, Ray; Melendez, Aldo P.

    This guide highlights operations and maintenance programs targeting energy and water efficiency that are estimated to save 5% to 20% on energy bills without a significant capital investment. The purpose of this guide is to provide you, the Operations and Maintenance (O&M)/Energy manager and practitioner, with useful information about O&M management, technologies, energy and water efficiency, and cost-reduction approaches. To make this guide useful and to reflect your needs and concerns, the authors met with O&M and Energy managers via Federal Energy Management Program (FEMP) workshops. In addition, the authors conducted extensive literature searches and contacted numerous vendors and industrymore » experts. The information and case studies that appear in this guide resulted from these activities. It needs to be stated at the outset that this guide is designed to provide information on effective O&M as it applies to systems and equipment typically found at Federal facilities. This guide is not designed to provide the reader with step-by-step procedures for performing O&M on any specific piece of equipment. Rather, this guide first directs the user to the manufacturer's specifications and recommendations. In no way should the recommendations in this guide be used in place of manufacturer's recommendations. The recommendations in this guide are designed to supplement those of the manufacturer, or, as is all too often the case, provide guidance for systems and equipment for which all technical documentation has been lost. As a rule, this guide will first defer to the manufacturer's recommendations on equipment operation and maintenance.« less

  12. 7 CFR 654.30 - Responsibility for operation and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Conservation...

  13. 7 CFR 654.30 - Responsibility for operation and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Conservation...

  14. 7 CFR 654.30 - Responsibility for operation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Conservation...

  15. 7 CFR 654.30 - Responsibility for operation and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Conservation...

  16. 7 CFR 654.30 - Responsibility for operation and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... soil and water conservation measures installed with NRCS assistance provided through soil, water, and other conservation districts. ... CONSERVATION SERVICE, DEPARTMENT OF AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Conservation...

  17. 25 CFR 39.1203 - Future consideration of contract school operation and maintenance funding.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Future consideration of contract school operation and maintenance funding. The Assistant Secretary shall... 25 Indians 1 2012-04-01 2011-04-01 true Future consideration of contract school operation and maintenance funding. 39.1203 Section 39.1203 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR...

  18. 25 CFR 39.1203 - Future consideration of contract school operation and maintenance funding.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Future consideration of contract school operation and maintenance funding. The Assistant Secretary shall... 25 Indians 1 2010-04-01 2010-04-01 false Future consideration of contract school operation and maintenance funding. 39.1203 Section 39.1203 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR...

  19. 25 CFR 39.1203 - Future consideration of contract school operation and maintenance funding.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Future consideration of contract school operation and maintenance funding. The Assistant Secretary shall... 25 Indians 1 2011-04-01 2011-04-01 false Future consideration of contract school operation and maintenance funding. 39.1203 Section 39.1203 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR...

  20. 25 CFR 39.1203 - Future consideration of contract school operation and maintenance funding.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Future consideration of contract school operation and maintenance funding. The Assistant Secretary shall... 25 Indians 1 2014-04-01 2014-04-01 false Future consideration of contract school operation and maintenance funding. 39.1203 Section 39.1203 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR...

  1. 25 CFR 39.1203 - Future consideration of contract school operation and maintenance funding.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Future consideration of contract school operation and maintenance funding. The Assistant Secretary shall... 25 Indians 1 2013-04-01 2013-04-01 false Future consideration of contract school operation and maintenance funding. 39.1203 Section 39.1203 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR...

  2. 14 CFR 171.273 - Maintenance and operations requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... guides stating the frequency of servicing. (8) Air-ground communications, if provided, expressly written... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Maintenance and operations requirements. 171.273 Section 171.273 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF...

  3. 14 CFR 171.273 - Maintenance and operations requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... guides stating the frequency of servicing. (8) Air-ground communications, if provided, expressly written... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Maintenance and operations requirements. 171.273 Section 171.273 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF...

  4. 14 CFR 171.273 - Maintenance and operations requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... guides stating the frequency of servicing. (8) Air-ground communications, if provided, expressly written... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Maintenance and operations requirements. 171.273 Section 171.273 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF...

  5. 14 CFR 171.273 - Maintenance and operations requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... guides stating the frequency of servicing. (8) Air-ground communications, if provided, expressly written... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Maintenance and operations requirements. 171.273 Section 171.273 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF...

  6. 14 CFR 171.273 - Maintenance and operations requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... guides stating the frequency of servicing. (8) Air-ground communications, if provided, expressly written... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Maintenance and operations requirements. 171.273 Section 171.273 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF...

  7. 7 CFR 1465.22 - Conservation practice operation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) during the contract duration to ensure that operation and maintenance requirements are being carried out... established in accordance with § 1465.23, provided such payments do not exceed the payment limitation...

  8. 14 CFR 171.115 - Maintenance and operations requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Maintenance and operations requirements. 171.115 Section 171.115 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... meet at a minimum the Federal Communications Commission's licensing requirements and show that he has...

  9. 14 CFR 171.115 - Maintenance and operations requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Maintenance and operations requirements. 171.115 Section 171.115 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... meet at a minimum the Federal Communications Commission's licensing requirements and show that he has...

  10. 14 CFR 171.115 - Maintenance and operations requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Maintenance and operations requirements. 171.115 Section 171.115 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... meet at a minimum the Federal Communications Commission's licensing requirements and show that he has...

  11. 14 CFR 171.115 - Maintenance and operations requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Maintenance and operations requirements. 171.115 Section 171.115 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... meet at a minimum the Federal Communications Commission's licensing requirements and show that he has...

  12. 14 CFR 171.115 - Maintenance and operations requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Maintenance and operations requirements. 171.115 Section 171.115 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF... meet at a minimum the Federal Communications Commission's licensing requirements and show that he has...

  13. Trends in Spending by the Department of Defense for Operation and Maintenance

    DTIC Science & Technology

    2017-01-01

    CONGRESS OF THE UNITED STATES CONGRESSIONAL BUDGET OFFICE CBO Trends in Spending by the Department of Defense for Operation and Maintenance JANUARY 2017...Funding? g the Growth in O&M Funding cheme gorization Scheme in Explaining Trends in O&M Funding ed ration and Maintenance Between 1980 and 2015 Maintenance ...by Category of Spending ration and Maintenance Between 2000 and 2012, by Category From 2000 to 2012 in Categories That Are Difficult to Track CBO

  14. SUMO: operation and maintenance management web tool for astronomical observatories

    NASA Astrophysics Data System (ADS)

    Mujica-Alvarez, Emma; Pérez-Calpena, Ana; García-Vargas, María. Luisa

    2014-08-01

    SUMO is an Operation and Maintenance Management web tool, which allows managing the operation and maintenance activities and resources required for the exploitation of a complex facility. SUMO main capabilities are: information repository, assets and stock control, tasks scheduler, executed tasks archive, configuration and anomalies control and notification and users management. The information needed to operate and maintain the system must be initially stored at the tool database. SUMO shall automatically schedule the periodical tasks and facilitates the searching and programming of the non-periodical tasks. Tasks planning can be visualized in different formats and dynamically edited to be adjusted to the available resources, anomalies, dates and other constrains that can arise during daily operation. SUMO shall provide warnings to the users notifying potential conflicts related to the required personal availability or the spare stock for the scheduled tasks. To conclude, SUMO has been designed as a tool to help during the operation management of a scientific facility, and in particular an astronomical observatory. This is done by controlling all operating parameters: personal, assets, spare and supply stocks, tasks and time constrains.

  15. Environmental management system for transportation maintenance operations : [technical brief].

    DOT National Transportation Integrated Search

    2014-04-01

    This report provides the framework for the environmental management system to analyze : greenhouse gas emissions from transportation maintenance operations. The system enables user : to compare different scenarios and make informed decisions to minim...

  16. An Analysis of Potential Space Shuttle Cargo-Handling Modes of Operation

    NASA Technical Reports Server (NTRS)

    Whitacre, Walter E.

    1970-01-01

    This report attempts to indicate the current status of Space Shuttle cargo handling analysis. It is intended for use by the various organizations operating in support of the Space Shuttle effort who are investigating problems not necessarily affected by the frequent configuration and approach changes imposed on the primary task team and contractor personnel. The various studies have been analyzed and the results interwoven with the results of in-house efforts. The problems involved in orbital docking, payload extraction and transfer, cargo handling, and special-purpose missions are discussed and some tentative conclusions and recommendations are presented. This report has been reviewed and approved for release by the MSFC Shuttle Task Team. However, no statements made herein should be interpreted as position statements with respect to the Space Shuttle, the direction of future efforts, or intended methods of operation. This document reflects the view of the author, following analysis of the data available, and should not be construed as an official recommendation.

  17. Operations and Maintenance Introductory O&M Newsletter | Poster

    Cancer.gov

    The Operations and Maintenance (O&M) department has been serving and supporting the NCI scientific mission since 1972. Our dedicated staff works 24/7 behind the scenes to ensure that the NCI campus and laboratory environments are safe, functional, and reliable, as well as comfortable and aesthetically pleasing.

  18. Best Practices in Photovoltaic System Operations and Maintenance: 2nd Edition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Whaley, Cass

    This best practices guide encourages high-quality system deployment and operation that improves lifetime project performance and energy production while reducing, or at least optimizing, costs to deliver an operation and maintenance program.

  19. 30 CFR 75.1725 - Machinery and equipment; operation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... machinery until the power is off and the machinery is blocked against motion, except where machinery motion... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Machinery and equipment; operation and....1725 Machinery and equipment; operation and maintenance. (a) Mobile and stationary machinery and...

  20. 30 CFR 75.1725 - Machinery and equipment; operation and maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... machinery until the power is off and the machinery is blocked against motion, except where machinery motion... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Machinery and equipment; operation and....1725 Machinery and equipment; operation and maintenance. (a) Mobile and stationary machinery and...

  1. 30 CFR 75.1725 - Machinery and equipment; operation and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... machinery until the power is off and the machinery is blocked against motion, except where machinery motion... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Machinery and equipment; operation and....1725 Machinery and equipment; operation and maintenance. (a) Mobile and stationary machinery and...

  2. 30 CFR 75.1725 - Machinery and equipment; operation and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... machinery until the power is off and the machinery is blocked against motion, except where machinery motion... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Machinery and equipment; operation and....1725 Machinery and equipment; operation and maintenance. (a) Mobile and stationary machinery and...

  3. 30 CFR 75.1725 - Machinery and equipment; operation and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... machinery until the power is off and the machinery is blocked against motion, except where machinery motion... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Machinery and equipment; operation and....1725 Machinery and equipment; operation and maintenance. (a) Mobile and stationary machinery and...

  4. 40 CFR 63.9636 - How do I demonstrate continuous compliance with the operation and maintenance requirements that...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... compliance with the operation and maintenance requirements that apply to me? 63.9636 Section 63.9636....9636 How do I demonstrate continuous compliance with the operation and maintenance requirements that... demonstrate continuous compliance with the operation and maintenance requirements in § 63.9600(b) by...

  5. 49 CFR 214.355 - Training and qualification in on-track safety for operators of roadway maintenance machines.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... operators of roadway maintenance machines. 214.355 Section 214.355 Transportation Other Regulations Relating... operators of roadway maintenance machines. (a) The training and qualification of roadway workers who operate roadway maintenance machines shall include, as a minimum: (1) Procedures to prevent a person from being...

  6. 49 CFR 214.355 - Training and qualification in on-track safety for operators of roadway maintenance machines.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... operators of roadway maintenance machines. 214.355 Section 214.355 Transportation Other Regulations Relating... operators of roadway maintenance machines. (a) The training and qualification of roadway workers who operate roadway maintenance machines shall include, as a minimum: (1) Procedures to prevent a person from being...

  7. Ship Operations, Maintenance, Repair and Upgrade for the R/V KILO MOANA

    DTIC Science & Technology

    2017-07-20

    From - To) 07/20/2017 Final Technical Report 03/19/2014 to 03/31/2017 4. TITLE AND SUBTITLE Sa. CONTRACT NUMBER Ship Operations, Maintenance , Repair...NUMBER Office of Research Services 2440 Campus Road , Box 368 Honolulu, Hawai’i 96822-2234 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10...Office of Naval Research. 15. SUBJECT TERMS Research vessel, operation, maintenance , repair. 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF a

  8. High Level Waste Remote Handling Equipment in the Melter Cave Support Handling System at the Hanford Waste Treatment Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bardal, M.A.; Darwen, N.J.

    2008-07-01

    Cold war plutonium production led to extensive amounts of radioactive waste stored in tanks at the Department of Energy's (DOE) Hanford site. Bechtel National, Inc. is building the largest nuclear Waste Treatment Plant in the world located at the Department of Energy's Hanford site to immobilize the millions of gallons of radioactive waste. The site comprises five main facilities; Pretreatment, High Level Waste vitrification, Low Active Waste vitrification, an Analytical Lab and the Balance of Facilities. The pretreatment facilities will separate the high and low level waste. The high level waste will then proceed to the HLW facility for vitrification.more » Vitrification is a process of utilizing a melter to mix molten glass with radioactive waste to form a stable product for storage. The melter cave is designated as the High Level Waste Melter Cave Support Handling System (HSH). There are several key processes that occur in the HSH cell that are necessary for vitrification and include: feed preparation, mixing, pouring, cooling and all maintenance and repair of the process equipment. Due to the cell's high level radiation, remote handling equipment provided by PaR Systems, Inc. is required to install and remove all equipment in the HSH cell. The remote handling crane is composed of a bridge and trolley. The trolley supports a telescoping tube set that rigidly deploys a TR 4350 manipulator arm with seven degrees of freedom. A rotating, extending, and retracting slewing hoist is mounted to the bottom of the trolley and is centered about the telescoping tube set. Both the manipulator and slewer are unique to this cell. The slewer can reach into corners and the manipulator's cross pivoting wrist provides better operational dexterity and camera viewing angles at the end of the arm. Since the crane functions will be operated remotely, the entire cell and crane have been modeled with 3-D software. Model simulations have been used to confirm operational and maintenance

  9. Establishing powder-handling workflow practices and standard operating procedures: compounding pharmacy and safety.

    PubMed

    Prince, Bryan; Lundevall, Jeremy

    2014-01-01

    This is an ongoing discussion and analysis of powder-handling safety in the compounding pharmacy laboratory that started in the November/December 2013 issue of the International Journal of Pharmaceutical Compounding. In the previous technical article, we established that most chemical powders handled during compounding procedures have an established occupational exposure limits and that powders are micronized during manipulation. All micronized powders handled on an open bench create health hazards to the technicians and create a potential for cross-contamination to the lab environment. Proper identification of the chemical hazard and established standard operating procedures in direct correlation to Good Lab Practices when working inside a powder hood will positively improve the compounding pharmacy's work environment.

  10. Highway Maintenance Equipment Operator: Basic Core. Training Materials.

    ERIC Educational Resources Information Center

    Perky, Sandra Dutreau; And Others

    This basic core curriculum is part of a three-part series of instructional guides designed for use in teaching a course in highway maintenance equipment operation. Addressed in the individual units of the curriculum, after an orientation unit, are safety; basic math; basic hand tools; procedures for loading. lashing, and unloading equipment;…

  11. Centralized operations and maintenance planning at the Atacama Large Millimeter/submillimeter Array (ALMA)

    NASA Astrophysics Data System (ADS)

    Lopez, Bernhard; Whyborn, Nicholas D.; Guniat, Serge; Hernandez, Octavio; Gairing, Stefan

    2016-07-01

    The Atacama Large Millimeter/submillimeter Array (ALMA) is a joint project between astronomical organizations in Europe, North America, and East Asia, in collaboration with the Republic of Chile. ALMA consists of 54 twelve-meter antennas and 12 seven-meter antennas operating as an aperture synthesis array in the (sub)millimeter wavelength range. Since the inauguration of the observatory back in March 2013 there has been a continuous effort to establish solid operations processes for effective and efficient management of technical and administrative tasks on site. Here a key aspect had been the centralized maintenance and operations planning: input is collected from science stakeholders, the computerized maintenance management system (CMMS) and from the technical teams spread around the world, then this information is analyzed and consolidated based on the established maintenance strategy, the observatory long-term plan and the short-term priorities definitions. This paper presents the high-level process that has been developed for the planning and scheduling of planned- and unplanned maintenance tasks, and for site operations like the telescope array reconfiguration campaigns. We focus on the centralized planning approach by presenting its genesis, its current implementation for the observatory operations including related planning products, and we explore the necessary next steps in order to fully achieve a comprehensive centralized planning approach for ALMA in steady-state operations.

  12. Artificial Intelligent Platform as Decision Tool for Asset Management, Operations and Maintenance.

    PubMed

    2018-01-04

    An Artificial Intelligence (AI) system has been developed and implemented for water, wastewater and reuse plants to improve management of sensors, short and long term maintenance plans, asset and investment management plans. It is based on an integrated approach to capture data from different computer systems and files. It adds a layer of intelligence to the data. It serves as a repository of key current and future operations and maintenance conditions that a plant needs have knowledge of. With this information, it is able to simulate the configuration of processes and assets for those conditions to improve or optimize operations, maintenance and asset management, using the IViewOps (Intelligent View of Operations) model. Based on the optimization through model runs, it is able to create output files that can feed data to other systems and inform the staff regarding optimal solutions to the conditions experienced or anticipated in the future.

  13. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cover, Columbia, South Carolina

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.

  14. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cover, Columbia, South Carolina

    NASA Astrophysics Data System (ADS)

    1980-09-01

    Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.

  15. Operation and Maintenance of Water Pollution Control Facilities: A WPCF White Paper.

    ERIC Educational Resources Information Center

    Hill, William R.; And Others

    1979-01-01

    Presented are the recommendations of the Water Pollution Control Federation for operation and maintenance consideration during the planning design, construction, and operation of wastewater treatment facilities. (CS)

  16. Computer Maintenance Operations Center (CMOC), additional computer support equipment ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Computer Maintenance Operations Center (CMOC), additional computer support equipment - Beale Air Force Base, Perimeter Acquisition Vehicle Entry Phased-Array Warning System, Techinical Equipment Building, End of Spencer Paul Road, north of Warren Shingle Road (14th Street), Marysville, Yuba County, CA

  17. 40 CFR 265.31 - Maintenance and operation of facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., soil, or surface water which could threaten human health or the -environment. ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Maintenance and operation of facility. 265.31 Section 265.31 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID...

  18. 46 CFR 160.156-21 - Operation and maintenance instructions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 6 2012-10-01 2012-10-01 false Operation and maintenance instructions. 160.156-21 Section 160.156-21 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Rescue Boats and Fast Rescue...

  19. 46 CFR 160.156-21 - Operation and maintenance instructions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Operation and maintenance instructions. 160.156-21 Section 160.156-21 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Rescue Boats and Fast Rescue...

  20. 46 CFR 160.156-21 - Operation and maintenance instructions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 6 2013-10-01 2013-10-01 false Operation and maintenance instructions. 160.156-21 Section 160.156-21 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Rescue Boats and Fast Rescue...

  1. Elements of an Asbestos Operations and Maintenance (O&M) Program

    EPA Pesticide Factsheets

    Links to descriptions of Elements of an Operations and Maintenance (O&M) Program: Training, Occupant Notification, Monitoring ACM, Job-Site Controls for Work Involving ACM, Safe Work Practices, Recordkeeping, Worker Protection.

  2. 40 CFR 63.7800 - What are my operation and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... prepare and operate at all times according to a written operation and maintenance plan for each capture... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Integrated Iron and Steel...

  3. 40 CFR 63.7800 - What are my operation and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... prepare and operate at all times according to a written operation and maintenance plan for each capture... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Integrated Iron and Steel...

  4. 40 CFR 63.7800 - What are my operation and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... prepare and operate at all times according to a written operation and maintenance plan for each capture... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Integrated Iron and Steel...

  5. 40 CFR 63.7800 - What are my operation and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... prepare and operate at all times according to a written operation and maintenance plan for each capture... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Integrated Iron and Steel...

  6. 40 CFR 63.7800 - What are my operation and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... prepare and operate at all times according to a written operation and maintenance plan for each capture... PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Integrated Iron and Steel...

  7. Preliminary maintenance experience for DSS 13 unattended operations demonstration. [Deep Space Network

    NASA Technical Reports Server (NTRS)

    Remer, D. S.; Lorden, G.

    1979-01-01

    The maintenance data base collected for 15 weeks of recent unattended and automated operation of DSS 13 is summarized. During this period, DSS 13 was receiving spacecraft telemetry while being controlled remotely from JPL in Pasadena. Corrective and preventive maintenance manhours are reported by subsystem for DSS 13 including the equipment added for the automation demonstration. The corrective and preventive maintenance weekly manhours at DSS 13 averaged 22 and 40, respectively. The antenna hydraulic and electronic systems accounted for about half of the preventive and corrective maintenance manhours for a comparable attended DSN station, DSS 11.

  8. Wastewater Plant Operation and Maintenance--A Matter of Growing Concern

    ERIC Educational Resources Information Center

    Water and Wastes Engineering, 1978

    1978-01-01

    Responses of two experts to questions concerning wastewater plant operation and maintenance are presented. The responses discuss the scarcity of good personnel, training education available, and examples of existing improvement projects. (MA)

  9. Maintenance and operations plan for intelligent transportation systems in Kentucky.

    DOT National Transportation Integrated Search

    2004-06-01

    This report presents a Maintenance and Operations Plan for Intelligent Transportation Systems (ITS) in Kentucky. It was developed using substantial stakeholder input and provides recommendations and specific strategies for supporting and coordinating...

  10. 33 CFR 159.57 - Installation, operation, and maintenance instructions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... capable of navigation by interstate vessel traffic subject to this regulation, marine sanitation devices... 33 Navigation and Navigable Waters 2 2011-07-01 2011-07-01 false Installation, operation, and maintenance instructions. 159.57 Section 159.57 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF...

  11. Operations and Maintenance, Part of Indoor Air Quailty Design Tools for Schools

    EPA Pesticide Factsheets

    Effective operation and maintenance procedures are fundamentally important to protect the investment in, and performance of, all building systems. Student health and productivity can suffer when building systems fail to operate as designed.

  12. 40 CFR 63.7826 - How do I demonstrate initial compliance with the operation and maintenance requirements that...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... preventative maintenance schedule and, as applicable, detailed descriptions of the corrective action procedures... compliance with the operation and maintenance requirements that apply to me? 63.7826 Section 63.7826... Compliance Requirements § 63.7826 How do I demonstrate initial compliance with the operation and maintenance...

  13. 40 CFR 35.925-10 - Operation and maintenance program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Operation and maintenance program. 35.925-10 Section 35.925-10 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act...

  14. 40 CFR 35.925-10 - Operation and maintenance program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Operation and maintenance program. 35.925-10 Section 35.925-10 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act...

  15. Operations and Maintenance Manual, Atmospheric Contaminant Sensor, Revision B.

    ERIC Educational Resources Information Center

    National Aeronautics and Space Administration, Washington, DC.

    The sensor is a mass spectrometer system which continuously monitors the atmospheric constituents of hydrogen, water vapor, nitrogen, oxygen, and carbon dioxide, and monitors the Freons on a demand sampling basis. The manual provides a system description, operational procedures, and maintenance and troubleshooting instructions. Circuit diagrams…

  16. 14 CFR 119.47 - Maintaining a principal base of operations, main operations base, and main maintenance base...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Maintaining a principal base of operations, main operations base, and main maintenance base; change of address. 119.47 Section 119.47 Aeronautics... Under Part 121 or Part 135 of This Chapter § 119.47 Maintaining a principal base of operations, main...

  17. 14 CFR 119.47 - Maintaining a principal base of operations, main operations base, and main maintenance base...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Maintaining a principal base of operations, main operations base, and main maintenance base; change of address. 119.47 Section 119.47 Aeronautics... Under Part 121 or Part 135 of This Chapter § 119.47 Maintaining a principal base of operations, main...

  18. 14 CFR 119.47 - Maintaining a principal base of operations, main operations base, and main maintenance base...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Maintaining a principal base of operations, main operations base, and main maintenance base; change of address. 119.47 Section 119.47 Aeronautics... Under Part 121 or Part 135 of This Chapter § 119.47 Maintaining a principal base of operations, main...

  19. 14 CFR 119.47 - Maintaining a principal base of operations, main operations base, and main maintenance base...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Maintaining a principal base of operations, main operations base, and main maintenance base; change of address. 119.47 Section 119.47 Aeronautics... Under Part 121 or Part 135 of This Chapter § 119.47 Maintaining a principal base of operations, main...

  20. Hand-handle interface force and torque measurement system for pneumatic assembly tool operations: suggested enhancement to ISO 6544.

    PubMed

    Lin, Jia-Hua; McGorry, Raymond W; Chang, Chien-Chi

    2007-05-01

    A hand-handle interface force and torque measurement system is introduced to fill the void acknowledged in the international standard ISO 6544, which governs pneumatic, assembly tool reaction torque and force measurement. This system consists of an instrumented handle with a sensor capable of measuring grip force and reaction hand moment when threaded, fastener-driving tools are used by operators. The handle is rigidly affixed to the tool in parallel to the original tool handle allowing normal fastener-driving operations with minimal interference. Demonstration of this proposed system was made with tools of three different shapes: pistol grip, right angle, and in-line. During tool torque buildup, the proposed system measured operators exerting greater grip force on the soft joint than on the hard joint. The system also demonstrated that the soft joint demanded greater hand moment impulse than the hard joint. The results demonstrate that the measurement system can provide supplemental data useful in exposure assessment with power hand tools as proposed in ISO 6544.

  1. Embracing Safe Ground Test Facility Operations and Maintenance

    NASA Technical Reports Server (NTRS)

    Dunn, Steven C.; Green, Donald R.

    2010-01-01

    Conducting integrated operations and maintenance in wind tunnel ground test facilities requires a balance of meeting due dates, efficient operation, responsiveness to the test customer, data quality, effective maintenance (relating to readiness and reliability), and personnel and facility safety. Safety is non-negotiable, so the balance must be an "and" with other requirements and needs. Pressure to deliver services faster at increasing levels of quality in under-maintained facilities is typical. A challenge for management is to balance the "need for speed" with safety and quality. It s especially important to communicate this balance across the organization - workers, with a desire to perform, can be tempted to cut corners on defined processes to increase speed. Having a lean staff can extend the time required for pre-test preparations, so providing a safe work environment for facility personnel and providing good stewardship for expensive National capabilities can be put at risk by one well-intending person using at-risk behavior. This paper documents a specific, though typical, operational environment and cites management and worker safety initiatives and tools used to provide a safe work environment. Results are presented and clearly show that the work environment is a relatively safe one, though still not good enough to keep from preventing injury. So, the journey to a zero injury work environment - both in measured reality and in the minds of each employee - continues. The intent of this paper is to provide a benchmark for others with operational environments and stimulate additional sharing and discussion on having and keeping a safe work environment.

  2. 40 CFR 63.7745 - How do I demonstrate continuous compliance with the operation and maintenance requirements that...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... compliance with the operation and maintenance requirements that apply to me? 63.7745 Section 63.7745....7745 How do I demonstrate continuous compliance with the operation and maintenance requirements that... maintenance requirements of § 63.7710 by: (1) Making monthly inspections of capture systems and initiating...

  3. Small Engines Care, Operation, Maintenance and Repair. Volume II.

    ERIC Educational Resources Information Center

    Turner, J. Howard

    Developed by teacher educators and agricultural engineers, this teacher and student reference is for use in a course in small engine operation and maintenance. Content includes: (1) Principles of Good Workmanship, (2) Repairing Starters, (3) Maintaining and Repairing Ignition Systems, (4) Repairing Fuel Systems, (5) Repairing Governors, (6)…

  4. Guidance Manual: Asbestos Operations & Maintenance Work Practices. Second Edition.

    ERIC Educational Resources Information Center

    National Inst. of Building Sciences, Washington, DC.

    This technical manual provides detailed guidance to building owners, asbestos program managers, and operations and maintenance (O&M) workers for managing asbestos-containing materials (ACM) in buildings. The manual addresses four different types of ACM found in buildings and three different levels of precaution which may be warranted by…

  5. Operations and maintenance manual, atmospheric contaminant sensor, revision B

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The sensor is a mass spectrometer system which continuously monitors the atmospheric constituents of hydrogen, water vapor, nitrogen, oxygen, and carbon dioxide, and monitors the Freons on a demand sampling basis. The manual provides a system description, operational procedures, and maintenance and troubleshooting instructions. Circuit diagrams are included.

  6. 21 CFR 878.5070 - Air-handling apparatus for a surgical operating room.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 8 2014-04-01 2014-04-01 false Air-handling apparatus for a surgical operating room. 878.5070 Section 878.5070 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES GENERAL AND PLASTIC SURGERY DEVICES Therapeutic Devices § 878...

  7. 21 CFR 878.5070 - Air-handling apparatus for a surgical operating room.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Air-handling apparatus for a surgical operating room. 878.5070 Section 878.5070 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES GENERAL AND PLASTIC SURGERY DEVICES Therapeutic Devices § 878...

  8. 21 CFR 878.5070 - Air-handling apparatus for a surgical operating room.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 8 2013-04-01 2013-04-01 false Air-handling apparatus for a surgical operating room. 878.5070 Section 878.5070 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICAL DEVICES GENERAL AND PLASTIC SURGERY DEVICES Therapeutic Devices § 878...

  9. Operations & Maintenance Best Practices - A Guide to Achieving Operational Efficiency Release 3.0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This Operations and Maintenance (O&M) Best Practices Guide was developed under the direction of the U.S. Department of Energy’s Federal Energy Management Program (FEMP). The mission of FEMP is to facilitate the Federal Government’s implementation of sound, cost effective energy management and investment practices to enhance the nation’s energy security and environmental stewardship.

  10. Generalized Operations Simulation Environment for Aircraft Maintenance Training

    DTIC Science & Technology

    2004-04-01

    Operations Simulation Environment ( GOSE ) project is a collaborative effort between AETC and AFRL to develop common, cost-effective, generalized VR training...maintenance training domain since it provided an opportunity to build on the VEST architecture. Development of GOSE involves re-engineering VEST as a scalable...modular, immersive VR training system comprised of PC-based hardware and software. GOSE initiatives include: (a) formalize training needs across

  11. 7 CFR 1468.22 - Conservation practice operation and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... operation and maintenance is occurring. (b) For those persons who are signatories to existing CRP or EQIP contracts, or WRP cost-share agreements, practices will be transferred from EQIP and CRP contracts or WRP... rights and obligations under CRP, EQIP, or WRP will be incorporated into the new CFO contract. Practices...

  12. Outsourcing strategy and tendering methodology for the operation and maintenance of CERN’s cryogenic facilities

    NASA Astrophysics Data System (ADS)

    Serio, L.; Bremer, J.; Claudet, S.; Delikaris, D.; Ferlin, G.; Ferrand, F.; Pezzetti, M.; Pirotte, O.

    2017-12-01

    CERN operates and maintains the world largest cryogenic infrastructure ranging from ageing but well maintained installations feeding detectors, test facilities and general services, to the state-of-the-art cryogenic system serving the flagship LHC machine complex. A study was conducted and a methodology proposed to outsource to industry the operation and maintenance of the whole cryogenic infrastructure. The cryogenic installations coupled to non LHC-detectors, test facilities and general services infrastructure have been fully outsourced for operation and maintenance on the basis of performance obligations. The contractor is responsible for the operational performance of the installations based on a yearly operation schedule provided by CERN. The maintenance of the cryogenic system serving the LHC machine and its detectors has been outsourced on the basis of tasks oriented obligations, monitored by key performance indicators. CERN operation team, with the support of the contractor operation team, remains responsible for the operational strategy and performances. We report the analysis, strategy, definition of the requirements and technical specifications as well as the achieved technical and economic performances after one year of operation.

  13. The roles of vibration analysis and infrared thermography in monitoring air-handling equipment

    NASA Astrophysics Data System (ADS)

    Wurzbach, Richard N.

    2003-04-01

    Industrial and commercial building equipment maintenance has not historically been targeted for implementation of PdM programs. The focus instead has been on manufacturing, aerospace and energy industries where production interruption has significant cost implications. As cost-effectiveness becomes more pervasive in corporate culture, even office space and labor activities housed in large facilities are being scrutinized for cost-cutting measures. When the maintenance costs for these facilities are reviewed, PdM can be considered for improving the reliability of the building temperature regulation, and reduction of maintenance repair costs. An optimized program to direct maintenance resources toward a cost effective and pro-active management of the facility can result in reduced operating budgets, and greater occupant satisfaction. A large majority of the significant rotating machinery in a large building environment are belt-driven air handling units. These machines are often poorly designed or utilized within the facility. As a result, the maintenance staff typically find themselves scrambling to replace belts and bearings, going from one failure to another. Instead of the reactive-mode maintenance, some progressive and critical institutions are adopting predictive and proactive technologies of infrared thermography and vibration analysis. Together, these technologies can be used to identify design and installation problems, that when corrected, significantly reduce maintenance and increase reliability. For critical building use, such as laboratories, research facilities, and other high value non-industrial settings, the cost-benefits of more reliable machinery can contribute significantly to the operational success.

  14. 43 CFR 404.40 - What is the non-Federal share of operation, maintenance, and replacement costs?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Cost-Sharing § 404.40 What is the non-Federal share of operation, maintenance, and replacement costs? You are required to pay 100 percent of the operation, maintenance, and replacement costs of any rural... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false What is the non-Federal share of operation...

  15. Integrated scheduling of a container handling system with simultaneous loading and discharging operations

    NASA Astrophysics Data System (ADS)

    Li, Chen; Lu, Zhiqiang; Han, Xiaole; Zhang, Yuejun; Wang, Li

    2016-03-01

    The integrated scheduling of container handling systems aims to optimize the coordination and overall utilization of all handling equipment, so as to minimize the makespan of a given set of container tasks. A modified disjunctive graph is proposed and a mixed 0-1 programming model is formulated. A heuristic algorithm is presented, in which the original problem is divided into two subproblems. In the first subproblem, contiguous bay crane operations are applied to obtain a good quay crane schedule. In the second subproblem, proper internal truck and yard crane schedules are generated to match the given quay crane schedule. Furthermore, a genetic algorithm based on the heuristic algorithm is developed to search for better solutions. The computational results show that the proposed algorithm can efficiently find high-quality solutions. They also indicate the effectiveness of simultaneous loading and discharging operations compared with separate ones.

  16. 46 CFR 15.1107 - Maintenance of merchant mariners' records by owner or operator.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 1 2011-10-01 2011-10-01 false Maintenance of merchant mariners' records by owner or operator. 15.1107 Section 15.1107 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN MANNING REQUIREMENTS Vessels Subject to Requirements of STCW § 15.1107 Maintenance of...

  17. 46 CFR 15.1107 - Maintenance of merchant mariners' records by owner or operator.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 1 2012-10-01 2012-10-01 false Maintenance of merchant mariners' records by owner or operator. 15.1107 Section 15.1107 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN MANNING REQUIREMENTS Vessels Subject to Requirements of STCW § 15.1107 Maintenance of...

  18. 46 CFR 15.1107 - Maintenance of merchant mariners' records by owner or operator.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 1 2013-10-01 2013-10-01 false Maintenance of merchant mariners' records by owner or operator. 15.1107 Section 15.1107 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN MANNING REQUIREMENTS Vessels Subject to Requirements of STCW § 15.1107 Maintenance of...

  19. 25 CFR 39.1201 - Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... and maintenance fund for contract schools. 39.1201 Section 39.1201 Indians BUREAU OF INDIAN AFFAIRS... the Contract School Operation and Maintenance Fund. The Secretary shall cause the distribution of an... an appropriate account or subaccount for the Contract School Operation and Maintenance Fund. ...

  20. Autonomous spacecraft maintenance study group

    NASA Technical Reports Server (NTRS)

    Marshall, M. H.; Low, G. D.

    1981-01-01

    A plan to incorporate autonomous spacecraft maintenance (ASM) capabilities into Air Force spacecraft by 1989 is outlined. It includes the successful operation of the spacecraft without ground operator intervention for extended periods of time. Mechanisms, along with a fault tolerant data processing system (including a nonvolatile backup memory) and an autonomous navigation capability, are needed to replace the routine servicing that is presently performed by the ground system. The state of the art fault handling capabilities of various spacecraft and computers are described, and a set conceptual design requirements needed to achieve ASM is established. Implementations for near term technology development needed for an ASM proof of concept demonstration by 1985, and a research agenda addressing long range academic research for an advanced ASM system for 1990s are established.

  1. Computer Maintenance Operations Center (CMOC), showing duplexed cyber 170174 computers ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Computer Maintenance Operations Center (CMOC), showing duplexed cyber 170-174 computers - Beale Air Force Base, Perimeter Acquisition Vehicle Entry Phased-Array Warning System, Techinical Equipment Building, End of Spencer Paul Road, north of Warren Shingle Road (14th Street), Marysville, Yuba County, CA

  2. Risk assessment of maintenance operations: the analysis of performing task and accident mechanism.

    PubMed

    Carrillo-Castrillo, Jesús A; Rubio-Romero, Juan Carlos; Guadix, Jose; Onieva, Luis

    2015-01-01

    Maintenance operations cover a great number of occupations. Most small and medium-sized enterprises lack the appropriate information to conduct risk assessments of maintenance operations. The objective of this research is to provide a method based on the concepts of task and accident mechanisms for an initial risk assessment by taking into consideration the prevalence and severity of the maintenance accidents reported. Data were gathered from 11,190 reported accidents in maintenance operations in the manufacturing sector of Andalusia from 2003 to 2012. By using a semi-quantitative methodology, likelihood and severity were evaluated based on the actual distribution of accident mechanisms in each of the tasks. Accident mechanisms and tasks were identified by using those variables included in the European Statistics of Accidents at Work methodology. As main results, the estimated risk of the most frequent accident mechanisms identified for each of the analysed tasks is low and the only accident mechanisms with medium risk are accidents when lifting or pushing with physical stress on the musculoskeletal system in tasks involving carrying, and impacts against objects after slipping or stumbling for tasks involving movements. The prioritisation of public preventive actions for the accident mechanisms with a higher estimated risk is highly recommended.

  3. Understanding alterations in drug handling with aging: a focus on the pharmacokinetics of maintenance immunosuppressants in the elderly.

    PubMed

    Gabardi, Steven; Tullius, Stefan G; Krenzien, Felix

    2015-08-01

    This review presents current knowledge of the impact of age on the pharmacokinetics of maintenance immunosuppressants. Over the past decade, there has been a steady increase in older patients on organ transplant waiting lists. As a result, the average age of transplant recipients has significantly increased. The survival and quality-of-life benefits of transplantation in the elderly population have been demonstrated. Advancing age is associated with changes in immune responses, as well as changes in drug handling. Immunosenescence is a physiological part of aging and is linked to reduced rejection rates, but also higher rates of diabetes, infections and malignancies. Physiologic changes associated with age can have a significant impact on the pharmacokinetics of the maintenance immunosuppressive agents. Taken together, these age-related changes impact older transplant candidates and may have significant implications for managing immunosuppression in the elderly. Despite the lack of formal efficacy, safety and pharmacokinetic studies of individual immunosuppressants in the elderly transplant population, there are enough data available for practitioners to be able to adequately manage their older patients. A proficient understanding of the factors that impact the pharmacokinetics of the immunosuppressants in the elderly is essential to managing these patients successfully.

  4. Operation and Maintenance of Wastewater Collection Systems. Volume I. Third Edition. A Field Study Training Program.

    ERIC Educational Resources Information Center

    California State Univ., Sacramento. Dept. of Civil Engineering.

    Proper installations, inspections, operations, maintenance and repairs of wastewater collection, conveyance and treatment facilities have a significant impact on the operation and maintenance costs, and the effectiveness of these facilities. This manual is the first volume of a two-part program designed to provide wastewater collection system…

  5. TSTA Piping and Flame Arrestor Operating Experience Data

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cadwallader, Lee C.; Willms, R. Scott

    The Tritium Systems Test Assembly (TSTA) was a facility dedicated to tritium handling technology and experiment research at the Los Alamos National Laboratory. The facility operated from 1984 to 2001, running a prototype fusion fuel processing loop with ~100 grams of tritium as well as small experiments. There have been several operating experience reports written on this facility’s operation and maintenance experience. This paper describes analysis of two additional components from TSTA, small diameter gas piping that handled small amounts of tritium in a nitrogen carrier gas, and the flame arrestor used in this piping system. The operating experiences andmore » the component failure rates for these components are discussed in this paper. Comparison data from other applications are also presented.« less

  6. 75 FR 54024 - Drawbridge Operation Regulations; Shaw Cove, New London, CT, Maintenance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-03

    ... Operation Regulations; Shaw Cove, New London, CT, Maintenance AGENCY: Coast Guard, DHS. ACTION: Notice of... temporary deviation from the regulation governing the operation of the Amtrak Bridge across Shaw Cove, mile...-9826. SUPPLEMENTARY INFORMATION: The Amtrak Bridge, across Shaw Cove at mile 0.0, at New London...

  7. 75 FR 20776 - Drawbridge Operation Regulations; Shaw Cove, New London, CT, Maintenance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-21

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2010-0227] Drawbridge Operation Regulations; Shaw Cove, New London, CT, Maintenance AGENCY: Coast Guard, DHS. ACTION: Notice of... temporary deviation from the regulation governing the operation of the Amtrak Bridge across Shaw Cove, mile...

  8. Mapping Operation and Maintenance Strategy for U.S. Offshore Wind Farms

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dewan, Ashish; Stehly, Tyler

    This presentation provides an overview of a collaborative effort between ECN and the National Renewable Energy Laboratory that focused on an operation and maintenance study of six offshore wind power plants in the United States.

  9. Operation room tool handling and miscommunication scenarios: an object-process methodology conceptual model.

    PubMed

    Wachs, Juan P; Frenkel, Boaz; Dori, Dov

    2014-11-01

    Errors in the delivery of medical care are the principal cause of inpatient mortality and morbidity, accounting for around 98,000 deaths in the United States of America (USA) annually. Ineffective team communication, especially in the operation room (OR), is a major root of these errors. This miscommunication can be reduced by analyzing and constructing a conceptual model of communication and miscommunication in the OR. We introduce the principles underlying Object-Process Methodology (OPM)-based modeling of the intricate interactions between the surgeon and the surgical technician while handling surgical instruments in the OR. This model is a software- and hardware-independent description of the agents engaged in communication events, their physical activities, and their interactions. The model enables assessing whether the task-related objectives of the surgical procedure were achieved and completed successfully and what errors can occur during the communication. The facts used to construct the model were gathered from observations of various types of operations miscommunications in the operating room and its outcomes. The model takes advantage of the compact ontology of OPM, which is comprised of stateful objects - things that exist physically or informatically, and processes - things that transform objects by creating them, consuming them or changing their state. The modeled communication modalities are verbal and non-verbal, and errors are modeled as processes that deviate from the "sunny day" scenario. Using OPM refinement mechanism of in-zooming, key processes are drilled into and elaborated, along with the objects that are required as agents or instruments, or objects that these processes transform. The model was developed through an iterative process of observation, modeling, group discussions, and simplification. The model faithfully represents the processes related to tool handling that take place in an OR during an operation. The specification is at

  10. Sprag Handle Wrenches

    NASA Technical Reports Server (NTRS)

    Vranishm, John M.

    2010-01-01

    Sprag handle wrenches have been proposed for general applications in which conventional pawl-and-ratchet wrenches and sprag and cam "clickless" wrenches are now used. Sprag handle wrenches are so named because they would include components that would function both as parts of handles and as sprags (roller locking/unlocking components). In comparison with all of the aforementioned conventional wrenches, properly designed sprag handle wrenches could operate with much less backlash; in comparison with the conventional clickless wrenches, sprag handle wrenches could be stronger and less expensive (because the sprags would be larger and more easily controllable than are conventional sprags and cams).

  11. Computer-aided acquisition and logistics support (CALS): Concept of Operations for Depot Maintenance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bourgeois, N.C.; Greer, D.K.

    1993-04-01

    This CALS Concept of Operations for Depot Maintenance provides the foundation strategy and the near term tactical plan for CALS implementation in the depot maintenance environment. The user requirements enumerated and the overarching architecture outlined serve as the primary framework for implementation planning. The seamless integration of depot maintenance business processes and supporting information systems with the emerging global CALS environment will be critical to the efficient realization of depot user's information requirements, and as, such will be a fundamental theme in depot implementations.

  12. 25 CFR 171.500 - How does BIA determine the annual operation and maintenance assessment rate for the irrigation...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER IRRIGATION OPERATION AND...) Annual operation and maintenance assessment rates may be lowered through the exercise of our discretion... supplemental water is available, the calculation of your annual operation and maintenance assessment rate may...

  13. 25 CFR 171.500 - How does BIA determine the annual operation and maintenance assessment rate for the irrigation...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER IRRIGATION OPERATION AND...) Annual operation and maintenance assessment rates may be lowered through the exercise of our discretion... supplemental water is available, the calculation of your annual operation and maintenance assessment rate may...

  14. 25 CFR 171.500 - How does BIA determine the annual operation and maintenance assessment rate for the irrigation...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER IRRIGATION OPERATION AND...) Annual operation and maintenance assessment rates may be lowered through the exercise of our discretion... supplemental water is available, the calculation of your annual operation and maintenance assessment rate may...

  15. Cryogenics maintenance strategy

    NASA Astrophysics Data System (ADS)

    Cruzat, Fabiola

    2012-09-01

    ALMA is an interferometer composed of 66 independent systems, with specific maintenance requirements for each subsystem. To optimize the observation time and reduce downtime maintenance, requirements are very demanding. One subsystem with high maintenance efforts is cryogenics and vacuum. To organize the maintenance, the Cryogenic and Vacuum department is using and implementing different tools. These are monitoring and problem reporting systems and CMMS. This leads to different maintenance approaches: Preventive Maintenance, Corrective Maintenance and Condition Based Maintenance. In order to coordinate activities with other departments the preventive maintenance schedule is kept as flexible as systems allow. To cope with unavoidable failures, the team has to be prepared to work under any condition with the spares on time. Computerized maintenance management system (CMMS) will help to manage inventory control for reliable spare part handling, the correct record of work orders and traceability of maintenance activities. For an optimized approach the department is currently evaluating where preventive or condition based maintenance applies to comply with the individual system demand. Considering the change from maintenance contracts to in-house maintenance will help to minimize costs and increase availability of parts. Due to increased number of system and tasks the cryo team needs to grow. Training of all staff members is mandatory, in depth knowledge must be built up by doing complex maintenance activities in the Cryo group, use of advanced computerized metrology systems.

  16. Helicopter Handling Qualities

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Helicopters are used by the military and civilian communities for a variety of tasks and must be capable of operating in poor weather conditions and at night. Accompanying extended helicopter operations is a significant increase in pilot workload and a need for better handling qualities. An overview of the status and problems in the development and specification of helicopter handling-qualities criteria is presented. Topics for future research efforts by government and industry are highlighted.

  17. 41 CFR 102-85.175 - Are the standard level services for cleaning, mechanical operation, and maintenance identified in...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... services for cleaning, mechanical operation, and maintenance identified in an OA? 102-85.175 Section 102-85... of Service § 102-85.175 Are the standard level services for cleaning, mechanical operation, and..., mechanical operation, and maintenance shall be provided in accordance with the GSA standard level of services...

  18. Feasibility of Portable Traffic Signals to Replace Flaggers in Maintenance Operations

    DOT National Transportation Integrated Search

    2000-02-01

    The purpose of this project is to summarize the results of the research project that explored the use of portable traffic signal technology as a means for improving the efficiency of two-lane rural maintenance operations. The research findings are ba...

  19. Initial flight qualification and operational maintenance of X-29A flight software

    NASA Technical Reports Server (NTRS)

    Earls, Michael R.; Sitz, Joel R.

    1989-01-01

    A discussion is presented of some significant aspects of the initial flight qualification and operational maintenance of the flight control system softward for the X-29A technology demonstrator. Flight qualification and maintenance of complex, embedded flight control system software poses unique problems. The X-29A technology demonstrator aircraft has a digital flight control system which incorporates functions generally considered too complex for analog systems. Organizational responsibilities, software assurance issues, tools, and facilities are discussed.

  20. 40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 13 2013-07-01 2012-07-01 true What are my monitoring installation... Compliance Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according...

  1. 40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 12 2011-07-01 2009-07-01 true What are my monitoring installation... Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according to the...

  2. 40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 13 2014-07-01 2014-07-01 false What are my monitoring installation... Compliance Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You must install, operate, and maintain each continuous emission monitoring system according...

  3. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 13 2011-07-01 2011-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  4. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 14 2012-07-01 2011-07-01 true What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  5. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 14 2014-07-01 2014-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  6. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 13 2010-07-01 2010-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  7. 40 CFR 63.7945 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 14 2013-07-01 2013-07-01 false What are my monitoring installation, operation, and maintenance requirements? 63.7945 Section 63.7945 Protection of Environment ENVIRONMENTAL... Remediation Continuous Monitoring Systems § 63.7945 What are my monitoring installation, operation, and...

  8. 29 CFR 1918.96 - Maintenance and repair work in the vicinity of longshoring operations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... General Working Conditions. § 1918.96 Maintenance and repair work in the vicinity of longshoring... 29 Labor 7 2010-07-01 2010-07-01 false Maintenance and repair work in the vicinity of longshoring... operations shall not be carried on in the hold or on deck beneath work being conducted overhead whenever such...

  9. A Versatile Lifting Device for Lunar Surface Payload Handling, Inspection and Regolith Transport Operations

    NASA Technical Reports Server (NTRS)

    Doggett, William R.; Dorsey, John T.; Collins, Timothy J.; King, Bruce D.; Mikulas, Martin M., Jr.

    2008-01-01

    Devices for lifting and transporting payloads and material are critical for efficient Earth-based construction operations. Devices with similar functionality will be needed to support lunar-outpost construction, servicing, inspection, regolith excavation, grading and payload placement. Past studies have proposed that only a few carefully selected devices are required for a lunar outpost. One particular set of operations involves lifting and manipulating payloads in the 100 kg to 3,000 kg range, which are too large or massive to be handled by unassisted astronauts. This paper will review historical devices used for payload handling in space and on earth to derive a set of desirable features for a device that can be used on planetary surfaces. Next, an innovative concept for a lifting device is introduced, which includes many of the desirable features. The versatility of the device is discussed, including its application to lander unloading, servicing, inspection, regolith excavation and site preparation. Approximate rules, which can be used to size the device for specific payload mass and reach requirements, are provided. Finally, details of a test-bed implementation of the innovative concept, which will be used to validate the structural design and develop operational procedures, is provided.

  10. 40 CFR 85.1404 - Maintenance of records for urban bus operators; submittal of information; right of entry.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 19 2014-07-01 2014-07-01 false Maintenance of records for urban bus... SOURCES Urban Bus Rebuild Requirements § 85.1404 Maintenance of records for urban bus operators; submittal of information; right of entry. (a) The operator of any urban bus for which this subpart is...

  11. 40 CFR 85.1404 - Maintenance of records for urban bus operators; submittal of information; right of entry.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 19 2012-07-01 2012-07-01 false Maintenance of records for urban bus... SOURCES Urban Bus Rebuild Requirements § 85.1404 Maintenance of records for urban bus operators; submittal of information; right of entry. (a) The operator of any urban bus for which this subpart is...

  12. 40 CFR 85.1404 - Maintenance of records for urban bus operators; submittal of information; right of entry.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 19 2013-07-01 2013-07-01 false Maintenance of records for urban bus... SOURCES Urban Bus Rebuild Requirements § 85.1404 Maintenance of records for urban bus operators; submittal of information; right of entry. (a) The operator of any urban bus for which this subpart is...

  13. 40 CFR 85.1404 - Maintenance of records for urban bus operators; submittal of information; right of entry.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 18 2011-07-01 2011-07-01 false Maintenance of records for urban bus... SOURCES Urban Bus Rebuild Requirements § 85.1404 Maintenance of records for urban bus operators; submittal of information; right of entry. (a) The operator of any urban bus for which this subpart is...

  14. Installation, maintenance and operating manual for the Lucas-type fuel injection system of the 3 B rotary engine

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The installation procedure, maintenance, adjustment and operation of a Lucas type fuel injection system for 13B rotary racing engine is outlined. Components of the fuel injection system and installation procedure and notes are described. Maintenance, adjustment, and operation are discussed.

  15. 40 CFR 63.6125 - What are my monitor installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Stationary Combustion Turbines Testing and Initial Compliance Requirements § 63.6125 What are my monitor installation, operation, and maintenance requirements? (a) If you are operating a stationary combustion turbine... emission control device, you must monitor on a continuous basis your catalyst inlet temperature in order to...

  16. 75 FR 62469 - Drawbridge Operation Regulations; Charles River, Boston, MA, Maintenance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-12

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2010-0847] Drawbridge Operation Regulations; Charles River, Boston, MA, Maintenance AGENCY: Coast Guard, DHS. ACTION: Notice of temporary deviation from regulations. SUMMARY: The Commander, First Coast Guard District, has issued a...

  17. 29 CFR 1915.93 - Motor vehicle safety equipment, operation and maintenance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 7 2013-07-01 2013-07-01 false Motor vehicle safety equipment, operation and maintenance. 1915.93 Section 1915.93 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) OCCUPATIONAL SAFETY AND HEALTH STANDARDS FOR SHIPYARD EMPLOYMENT...

  18. 29 CFR 1915.93 - Motor vehicle safety equipment, operation and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 7 2014-07-01 2014-07-01 false Motor vehicle safety equipment, operation and maintenance. 1915.93 Section 1915.93 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) OCCUPATIONAL SAFETY AND HEALTH STANDARDS FOR SHIPYARD EMPLOYMENT...

  19. 29 CFR 1915.93 - Motor vehicle safety equipment, operation and maintenance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 7 2012-07-01 2012-07-01 false Motor vehicle safety equipment, operation and maintenance. 1915.93 Section 1915.93 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) OCCUPATIONAL SAFETY AND HEALTH STANDARDS FOR SHIPYARD EMPLOYMENT...

  20. Design, fabrication, delivery, operation and maintenance of a geothermal power conversion system

    NASA Technical Reports Server (NTRS)

    1980-01-01

    The design, fabrication, delivery, operation and maintenance of an Hydrothermal Power Company 1250 KVA geothermal power conversion system using a helical screw expander as the prime mover is described. Hydrostatic and acceptance testing are discussed.

  1. 49 CFR 192.605 - Procedural manual for operations, maintenance, and emergencies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... maintenance activities and for emergency response. For transmission lines, the manual must also include... and effective manner. (5) Starting up and shutting down any part of the pipeline in a manner designed... control room management procedures required by § 192.631. (c) Abnormal operation. For transmission lines...

  2. 40 CFR 63.1108 - Compliance with standards and operation and maintenance requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operation and maintenance requirements. 63.1108 Section 63.1108 Protection of Environment ENVIRONMENTAL... Source Categories: Generic Maximum Achievable Control Technology Standards § 63.1108 Compliance with..., air pollution control technologies, recovery technologies, work practices, pollution prevention...

  3. 40 CFR 63.1572 - What are my monitoring installation, operation, and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Requirements § 63.1572 What are my monitoring installation, operation, and maintenance requirements? (a) You... requirements in paragraphs (a)(1) through (4) of this section. (1) You must install, operate, and maintain each continuous emission monitoring system according to the requirements in Table 40 of this subpart. (2) If you...

  4. 25 CFR 171.500 - How does BIA determine the annual operation and maintenance assessment rate for the irrigation...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... maintenance assessment rate for the irrigation facility servicing my farm unit? 171.500 Section 171.500 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER IRRIGATION OPERATION AND... annual operation and maintenance assessment rate for the irrigation facility servicing my farm unit? (a...

  5. Economic Evaluation of Building Design, Construction, Operation and Maintenance. Seminar Workbook.

    ERIC Educational Resources Information Center

    Ruegg, Rosalie T.

    This workbook has been prepared for participants in the seminar, "Economic Evaluation of Building Design, Construction, Operation and Maintenance." It has two main functions: (1) to provide basic resource materials, references, and introductions to methods employed in the seminar; and (2) to provide instructional problems for solution by…

  6. 40 CFR 141.804 - Aircraft water system operations and maintenance plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 23 2014-07-01 2014-07-01 false Aircraft water system operations and maintenance plan. 141.804 Section 141.804 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Aircraft Drinking Water Rule § 141.804 Aircraft water system...

  7. 40 CFR 63.6625 - What are my monitoring, installation, collection, operation, and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., operate, and maintain a CEMS to monitor CO and either O2 or CO2 according to the requirements in... program must be part of the maintenance plan for the engine. (j) If you own or operate a stationary SI...

  8. Robotic assembly and maintenance of future space stations based on the ISS mission operations experience

    NASA Astrophysics Data System (ADS)

    Rembala, Richard; Ower, Cameron

    2009-10-01

    MDA has provided 25 years of real-time engineering support to Shuttle (Canadarm) and ISS (Canadarm2) robotic operations beginning with the second shuttle flight STS-2 in 1981. In this capacity, our engineering support teams have become familiar with the evolution of mission planning and flight support practices for robotic assembly and support operations at mission control. This paper presents observations on existing practices and ideas to achieve reduced operational overhead to present programs. It also identifies areas where robotic assembly and maintenance of future space stations and space-based facilities could be accomplished more effectively and efficiently. Specifically, our experience shows that past and current space Shuttle and ISS assembly and maintenance operations have used the approach of extensive preflight mission planning and training to prepare the flight crews for the entire mission. This has been driven by the overall communication latency between the earth and remote location of the space station/vehicle as well as the lack of consistent robotic and interface standards. While the early Shuttle and ISS architectures included robotics, their eventual benefits on the overall assembly and maintenance operations could have been greater through incorporating them as a major design driver from the beginning of the system design. Lessons learned from the ISS highlight the potential benefits of real-time health monitoring systems, consistent standards for robotic interfaces and procedures and automated script-driven ground control in future space station assembly and logistics architectures. In addition, advances in computer vision systems and remote operation, supervised autonomous command and control systems offer the potential to adjust the balance between assembly and maintenance tasks performed using extra vehicular activity (EVA), extra vehicular robotics (EVR) and EVR controlled from the ground, offloading the EVA astronaut and even the robotic

  9. THE EFFECTS OF MAINTENANCE ACTIONS ON THE PFDavg OF SPRING OPERATED PRESSURE RELIEF VALVES

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harris, S.; Gross, R.

    2014-04-01

    The safety integrity level (SIL) of equipment used in safety instrumented functions is determined by the average probability of failure on demand (PFDavg) computed at the time of periodic inspection and maintenance, i.e., the time of proof testing. The computation of PFDavg is generally based solely on predictions or estimates of the assumed constant failure rate of the equipment. However, PFDavg is also affected by maintenance actions (or lack thereof) taken by the end user. This paper shows how maintenance actions can affect the PFDavg of spring operated pressure relief valves (SOPRV) and how these maintenance actions may be accountedmore » for in the computation of the PFDavg metric. The method provides a means for quantifying the effects of changes in maintenance practices and shows how these changes impact plant safety.« less

  10. The Effects of Maintenance Actions on the PFDavg of Spring Operated Pressure Relief Valves

    DOE PAGES

    Harris, S.; Gross, R.; Goble, W; ...

    2015-12-01

    The safety integrity level (SIL) of equipment used in safety instrumented functions is determined by the average probability of failure on demand (PFDavg) computed at the time of periodic inspection and maintenance, i.e., the time of proof testing. The computation of PFDavg is generally based solely on predictions or estimates of the assumed constant failure rate of the equipment. However, PFDavg is also affected by maintenance actions (or lack thereof) taken by the end user. This paper shows how maintenance actions can affect the PFDavg of spring operated pressure relief valves (SOPRV) and how these maintenance actions may be accountedmore » for in the computation of the PFDavg metric. The method provides a means for quantifying the effects of changes in maintenance practices and shows how these changes impact plant safety.« less

  11. 40 CFR 63.7300 - What are my operation and maintenance requirements?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and... operation and maintenance of new or existing by-product coke oven batteries. Each plan must address, at a... emissions from a new or existing coke oven battery. Each plan must address at a minimum the elements in...

  12. 40 CFR 63.7300 - What are my operation and maintenance requirements?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and... operation and maintenance of new or existing by-product coke oven batteries. Each plan must address, at a... emissions from a new or existing coke oven battery. Each plan must address at a minimum the elements in...

  13. 40 CFR 63.7300 - What are my operation and maintenance requirements?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and... operation and maintenance of new or existing by-product coke oven batteries. Each plan must address, at a... emissions from a new or existing coke oven battery. Each plan must address at a minimum the elements in...

  14. 40 CFR 63.7300 - What are my operation and maintenance requirements?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and... operation and maintenance of new or existing by-product coke oven batteries. Each plan must address, at a... emissions from a new or existing coke oven battery. Each plan must address at a minimum the elements in...

  15. 40 CFR 63.7300 - What are my operation and maintenance requirements?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) National Emission Standards for Hazardous Air Pollutants for Coke Ovens: Pushing, Quenching, and... operation and maintenance of new or existing by-product coke oven batteries. Each plan must address, at a... emissions from a new or existing coke oven battery. Each plan must address at a minimum the elements in...

  16. Economic Evaluation of Building Design, Construction, Operation and Maintenance. Instructor's Manual.

    ERIC Educational Resources Information Center

    Ruegg, Rosalie T.; Marshall, Harold E.

    This instructor's manual describes each section of a 3-day technical seminar on how to measure the economic impact of alternative designs, systems, and operation and maintenance strategies in federal buildings. The manual was prepared to help instructors of the General Services Administration conduct technically sound and comprehensive seminars.…

  17. 18 CFR 367.5000 - Accounts 500-598, Electric operation and maintenance accounts.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Accounts 500-598... Accounts 500-598, Electric operation and maintenance accounts. Service companies must use accounts 500 through 598 in part 101 of this chapter. ...

  18. 18 CFR 367.5000 - Accounts 500-598, Electric operation and maintenance accounts.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Accounts 500-598... Accounts 500-598, Electric operation and maintenance accounts. Service companies must use accounts 500 through 598 in part 101 of this chapter. ...

  19. 18 CFR 367.5000 - Accounts 500-598, Electric operation and maintenance accounts.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Accounts 500-598... Accounts 500-598, Electric operation and maintenance accounts. Service companies must use accounts 500 through 598 in part 101 of this chapter. ...

  20. 18 CFR 367.5000 - Accounts 500-598, Electric operation and maintenance accounts.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Accounts 500-598... Accounts 500-598, Electric operation and maintenance accounts. Service companies must use accounts 500 through 598 in part 101 of this chapter. ...

  1. 18 CFR 367.5000 - Accounts 500-598, Electric operation and maintenance accounts.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Accounts 500-598... Accounts 500-598, Electric operation and maintenance accounts. Service companies must use accounts 500 through 598 in part 101 of this chapter. ...

  2. Maintenance and operations tasks accomplished at DSS 12 during the antenna panel replacement downtime

    NASA Technical Reports Server (NTRS)

    Butcher, L.; Jonas, T.; Wood, W.

    1982-01-01

    The heavy schedule of tracking activities at the Echo Deep Space Station (DSS 12) prevents some time-consuming maintenance tasks from being performed. Careful coordination prior to and during a mandatory task (antenna panel replacement) made it possible to do a large number of unrelated tasks that ordinarily would have to be deferred. The maintenance and operations tasks accomplished during the downtime are described.

  3. Logistics Operations Management Center: Maintenance Support Baseline (LOMC-MSB)

    NASA Technical Reports Server (NTRS)

    Kurrus, R.; Stump, F.

    1995-01-01

    The Logistics Operations Management Center Maintenance Support Baseline is defined. A historical record of systems, applied to and deleted from, designs in support of future management and/or technical analysis is provided. All Flight elements, Ground Support Equipment, Facility Systems and Equipment and Test Support Equipment for which LOMC has responsibilities at Kennedy Space Center and other locations are listed. International Space Station Alpha Program documentation is supplemented. The responsibility of the Space Station Launch Site Support Office is established.

  4. 29 CFR 784.140 - Fabrication and handling of supplies for use in named operations.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 29 Labor 3 2012-07-01 2012-07-01 false Fabrication and handling of supplies for use in named operations. 784.140 Section 784.140 Labor Regulations Relating to Labor (Continued) WAGE AND HOUR DIVISION, DEPARTMENT OF LABOR STATEMENTS OF GENERAL POLICY OR INTERPRETATION NOT DIRECTLY RELATED TO REGULATIONS PROVISIONS OF THE FAIR LABOR STANDARDS ACT...

  5. 29 CFR 784.140 - Fabrication and handling of supplies for use in named operations.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 29 Labor 3 2013-07-01 2013-07-01 false Fabrication and handling of supplies for use in named operations. 784.140 Section 784.140 Labor Regulations Relating to Labor (Continued) WAGE AND HOUR DIVISION, DEPARTMENT OF LABOR STATEMENTS OF GENERAL POLICY OR INTERPRETATION NOT DIRECTLY RELATED TO REGULATIONS PROVISIONS OF THE FAIR LABOR STANDARDS ACT...

  6. 29 CFR 784.140 - Fabrication and handling of supplies for use in named operations.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 29 Labor 3 2014-07-01 2014-07-01 false Fabrication and handling of supplies for use in named operations. 784.140 Section 784.140 Labor Regulations Relating to Labor (Continued) WAGE AND HOUR DIVISION, DEPARTMENT OF LABOR STATEMENTS OF GENERAL POLICY OR INTERPRETATION NOT DIRECTLY RELATED TO REGULATIONS PROVISIONS OF THE FAIR LABOR STANDARDS ACT...

  7. 25 CFR 39.1201 - Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools. 39.1201 Section 39.1201 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Contract School Operation and Maintenance Fund § 39.1201 Establishment of...

  8. 25 CFR 39.1201 - Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools. 39.1201 Section 39.1201 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Contract School Operation and Maintenance Fund § 39.1201 Establishment of...

  9. 25 CFR 39.1201 - Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools. 39.1201 Section 39.1201 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Contract School Operation and Maintenance Fund § 39.1201 Establishment of...

  10. 25 CFR 171.510 - How does BIA calculate my annual operation and maintenance assessment if supplemental water is...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true How does BIA calculate my annual operation and maintenance assessment if supplemental water is available on the irrigation facility servicing my farm unit? 171.510 Section 171.510 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER IRRIGATION OPERATION AND MAINTENANCE Financial...

  11. 25 CFR 171.510 - How does BIA calculate my annual operation and maintenance assessment if supplemental water is...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How does BIA calculate my annual operation and maintenance assessment if supplemental water is available on the irrigation facility servicing my farm unit? 171.510 Section 171.510 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER IRRIGATION OPERATION AND MAINTENANCE Financial...

  12. 25 CFR 171.510 - How does BIA calculate my annual operation and maintenance assessment if supplemental water is...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false How does BIA calculate my annual operation and maintenance assessment if supplemental water is available on the irrigation facility servicing my farm unit? 171.510 Section 171.510 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER IRRIGATION OPERATION AND MAINTENANCE Financial...

  13. [Handling modern imaging procedures in a high-tech operating room].

    PubMed

    Hüfner, T; Citak, M; Imrecke, J; Krettek, C; Stübig, T

    2012-03-01

    Operating rooms are the central unit in the hospital network in trauma centers. In this area, high costs but also high revenues are generated. Modern operating theater concepts as an integrated model have been offered by different companies since the early 2000s. Our hypothesis is that integrative concepts for operating rooms, in addition to improved operating room ergonomics, have the potential for measurable time and cost savings. In our clinic, an integrated operating room concept (I-Suite, Stryker, Duisburg) was implemented after analysis of the problems. In addition to the ceiling-mounted arrangement, the system includes an endoscopy unit, a navigation system, and a voice control system. In the first 6 months (9/2005 to 2/2006), 112 procedures were performed in the integrated operating room: 34 total knee arthroplasties, 12 endoscopic spine surgeries, and 66 inpatient arthroscopic procedures (28 shoulder and 38 knee reconstructions). The analysis showed a daily saving of 22-45 min, corresponding to 15-30% of the daily changeover times, calculated to account for potential savings in the internal cost allocation of 225-450 EUR. A commercial operating room concept was evaluated in a pilot phase in terms of hard data, including time and cost factors. Besides the described effects further savings might be achieved through the effective use of voice control and the benefit of the sterile handle on the navigation camera, since waiting times for an additional nurse are minimized. The time of the procedure of intraoperative imaging is also reduced due to the ceiling-mounted concept, as the C-arm can be moved freely in the operating theater without hindering cables. By these measures and ensuing improved efficiency, the initial high costs for the implementation of the system may be cushioned over time.

  14. Automatisms in EMIR instrument to improve operation, safety and maintenance

    NASA Astrophysics Data System (ADS)

    Fernández Izquierdo, Patricia; Núñez Cagigal, Miguel; Barreto Rodríguez, Roberto; Martínez Rey, Noelia; Santana Tschudi, Samuel; Barreto Cabrera, Maria; Patrón Recio, Jesús; Garzón López, Francisco

    2014-08-01

    EMIR is the NIR imager and multiobject spectrograph being built as a common user instrument for the 10-m class GTC. Big cryogenic instruments demand a reliable design and a specific hardware and software to increase its safety and productivity. EMIR vacuum, cooling and heating systems are monitored and partially controlled by a Programmable Logic Controller (PLC) in industrial format with a touch screen. The PLC aids the instrument operator in the maintenance tasks recovering autonomously vacuum if required or proposing preventive maintenance actions. The PLC and its associated hardware improve EMIR safety having immediate reactions against eventual failure modes in the instrument or in external supplies, including hardware failures during the heating procedure or failure in the PLC itself. EMIR PLC provides detailed information periodically about status and alarms of vacuum and cooling components or external supplies.

  15. 46 CFR 28.140 - Operational readiness, maintenance, and inspection of lifesaving equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 1 2011-10-01 2011-10-01 false Operational readiness, maintenance, and inspection of lifesaving equipment. 28.140 Section 28.140 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY UNINSPECTED... wearable personal flotation device (Type V commercial hybrid) Servicing 28.140 (2) Personal flotation...

  16. 46 CFR 28.140 - Operational readiness, maintenance, and inspection of lifesaving equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Operational readiness, maintenance, and inspection of lifesaving equipment. 28.140 Section 28.140 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY UNINSPECTED... wearable personal flotation device (Type V commercial hybrid) Servicing 28.140 (2) Personal flotation...

  17. 25 CFR 39.1201 - Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Establishment of an interim fiscal year 1980 operation and maintenance fund for contract schools. 39.1201 Section 39.1201 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR EDUCATION THE INDIAN SCHOOL EQUALIZATION PROGRAM Contract School Operation and Maintenance Fund § 39.1201 Establishment of a...

  18. Aspects of remote maintenance in an FRG reprocessing plant from the manufacturer's viewpoint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zeitzchel, G.; Tennie, M.; Saal, G.

    In April 1986 a consortium led by Kraftwerk Union AG was commissioned by the German society for nuclear fuel reprocessing (DWK) to build the first West German commercial reprocessing plant for spent fuel assemblies. The main result of the planning efforts regarding remote maintenance operations inside the main process building was the introduction of FEMO technology (FEMO is an acronym based on German for remote handling modular technique). According to this technology the two cells in which the actual reprocessing (which is based on the PUREX technique) takes place are provided with frames to accommodate the process components (tanks, pumps,more » agitators, etc.), each frame together with the components which it supports forming one module. The two cells are inaccessible and windowless. For handling operations each cell is equipped with an overhead crane and a crane-like manipulator carrier system (MTS) with power manipulator. Viewing of the operations from outside the cells is made possible by television (TV) cameras installed at the crane, the MTS, and the manipulator. This paper addresses some examples of problems that still need to be solved in connection with FEMO handling. In particular, the need for close cooperation between the equipment operator, the component designer, the process engineer, the planning engineer, and the licensing authorities will be demonstrated.« less

  19. Operations and maintenance manual, atmospheric contaminant sensor. Addendum 1: Carbon monoxide monitor model 204

    NASA Technical Reports Server (NTRS)

    1972-01-01

    An instrument for monitoring the carbon monoxide content of the ambient atmosphere is described. The subjects discussed are: (1) theory of operation, (2) system features, (3) controls and monitors, (4) operational procedures, and (5) maintenance and troubleshooting. Block drawings and circuit diagrams are included to clarify the text.

  20. Connected Vehicle Pilot Deployment Program Phase 2 : Comprehensive Maintenance and Operations Plan - New York City

    DOT National Transportation Integrated Search

    2018-05-31

    This Comprehensive Maintenance and Operations Plan (CMOP) describes the types and number of equipment to be operated and maintained for the proposed New York City (NYC) Connected Vehicle Pilot Deployment (CVPD) system. Its objective is to develop a p...

  1. 76 FR 11959 - Drawbridge Operation Regulations; Hackensack River, Jersey City, NJ, Maintenance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 117 [Docket No. USCG-2011-0066] Drawbridge Operation Regulations; Hackensack River, Jersey City, NJ, Maintenance AGENCY: Coast Guard, DHS. ACTION... 3.1, across the Hackensack River, at Jersey City, New Jersey. The deviation is necessary to perform...

  2. Big Bay Harbor Operation and Maintenance Activities, Marquette County, Michigan.

    DTIC Science & Technology

    1975-04-01

    and Custom House St. Paul, Minnesota 55101 April 1975 ENVIRON1ENTAL ASSESSMENT REPORT OPERATION AND MAINTENANCE BIG BAY HARBOR BIG BAY, MICHIGAN LAKE...these parameters is important because of the deleterious effects of the parent and breakdown products. The presence of heavy metals, taconite tailings...iron mines further south in the county. 2.522 Powell Township is governed by a town supervisor and town board, all of whom are elected. The town owns a

  3. Site Data Acquisition Subsystem (SDAS) Mod 1, installation, operation, and maintenance manual

    NASA Technical Reports Server (NTRS)

    1977-01-01

    The Site Data Acquisition Subsystem (SDAS) Mod 1 was designed to collect sensor measurement data from solar energy demonstration site. This report provides a brief description of the SDAS and defines the installation requirements and procedures, the operations description and the procedures for field maintenance of the subsystem.

  4. Industrial relations: workings of the maintenance strike.

    PubMed

    Davidson, N

    1978-11-10

    The frustrations leading to the maintenance dispute go back four years. Author highlights the NHS's inability to handle internal disagreements, and the problems of a bureaucratic and politically-directed profession.

  5. Space shuttle maintenance program planning document

    NASA Technical Reports Server (NTRS)

    Brown, D. V.

    1972-01-01

    A means for developing a space shuttle maintenance program which will be acceptable to the development centers, the operators (KSC and AF), and the manufacturer is presented. The general organization and decision processes for determining the essential scheduled maintenance requirements for the space shuttle orbiter are outlined. The development of initial scheduled maintenance programs is discussed. The remaining maintenance, that is non-scheduled or non-routine maintenance, is directed by the findings of the scheduled maintenance program and the normal operation of the shuttle. The remaining maintenance consists of maintenance actions to correct discrepancies noted during scheduled maintenance tasks, nonscheduled maintenance, normal operation, or condition monitoring.

  6. Management of stormwater facility maintenance residuals

    DOT National Transportation Integrated Search

    1998-06-01

    Current research on stormwater maintenance residuals has revealed that the source and nature of these materials is extremely variable, that regulation can be ambiguous, and handling can be costly and difficult. From a regulatory perspective, data ind...

  7. Applying the TOC Project Management to Operation and Maintenance Scheduling of a Research Vessel

    NASA Astrophysics Data System (ADS)

    Manti, M. Firdausi; Fujimoto, Hideo; Chen, Lian-Yi

    Marine research vessels and their systems are major assets in the marine resources development. Since the running costs for the ship are very high, it is necessary to reduce the total cost by an efficient scheduling for operation and maintenance. To reduce project period and make it efficient, we applied TOC project management method that is a project management approach developed by Dr. Eli Goldratt. It challenges traditional approaches to project management. It will become the most important improvement in the project management since the development of PERT and critical path methodologies. As a case study, we presented the marine geology research project for the purpose of operations in addition to repair on the repairing dock projects for maintenance of vessels.

  8. 40 CFR 63.2987 - What must my operation, maintenance, and monitoring (OMM) plan include?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., maintenance, and monitoring (OMM) plan include? (a) You must prescribe the monitoring that will be performed...) For the burn cycle that follows the inspection, document that the thermal oxidizer is operating...

  9. 14 CFR 91.1425 - CAMP: Maintenance, preventive maintenance, and alteration programs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... RULES Fractional Ownership Operations Program Management § 91.1425 CAMP: Maintenance, preventive maintenance, and alteration programs. Each program manager who maintains program aircraft under a CAMP must... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false CAMP: Maintenance, preventive maintenance...

  10. Operation, Maintenance and Management of Wastewater Treatment Facilities: A Bibliography of Technical Documents.

    ERIC Educational Resources Information Center

    Himes, Dottie

    This is an annotated bibliography of wastewater treatment manuals. Fourteen manuals are abstracted including: (1) A Planned Maintenance Management System for Municipal Wastewater Treatment Plants; (2) Anaerobic Sludge Digestion, Operations Manual; (3) Emergency Planning for Municipal Wastewater Treatment Facilities; (4) Estimating Laboratory Needs…

  11. Project Plan 7930 Cell G PaR Remote Handling System Replacement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kinney, Kathryn A

    2009-10-01

    For over 40 years the US Department of Energy (DOE) and its predecessors have made Californium-252 ({sup 252}Cf) available for a wide range of industries including medical, nuclear fuels, mining, military and national security. The Radiochemical Engineering Development Center (REDC) located within the Oak Ridge National Laboratory (ORNL) processes irradiated production targets from the High Flux Isotope Reactor (HFIR). Operations in Building 7930, Cell G provide over 70% of the world's demand for {sup 252}Cf. Building 7930 was constructed and equipped in the mid-1960s. Current operations for {sup 252}Cf processing in Building 7930, Cell G require use of through-the-wall manipulatorsmore » and the PaR Remote Handling System. Maintenance and repairs for the manipulators is readily accomplished by removal of the manipulator and relocation to a repair shop where hands-on work can be performed in glove boxes. Contamination inside cell G does not currently allow manned entry and no provisions were created for a maintenance area inside the cell. There has been no maintenance of the PaR system or upgrades, leaving operations vulnerable should the system have a catastrophic failure. The Cell G PaR system is currently being operated in a run to failure mode. As the manipulator is now 40+ years old there is significant risk in this method of operation. In 2006 an assessment was completed that resulted in recommendations for replacing the manipulator operator control and power centers which are used to control and power the PaR manipulator in Cell G. In mid-2008 the chain for the bridge drive failed and subsequent examinations indicated several damaged links (see Figure 1). To continue operations the PaR manipulator arm is being used to push and pull the bridge as a workaround. A retrieval tool was fabricated, tested and staged inside Cell G that will allow positioning of the bridge and manipulator arm for removal from the cell should the PaR system completely fail. A fully

  12. Cost of Information Handling in Hospitals

    PubMed Central

    Jydstrup, Ronald A.; Gross, Malvern J.

    1966-01-01

    Cost of information handling (noncomputerized) in hospitals was studied in detail from an industrial engineering point of view at Rochester General, Highland, and Geneva General hospitals. Activities were observed, personnel questioned, and time studies carried out. It was found that information handling comprises about one fourth of the hospitals' operating cost—a finding strongly recommending revision and streamlining of both forms and inefficient operations. In an Appendix to this study are presented 15 items that would improve information handling in one area of the hospital, nursing units, where this activity is greater than in any other in a hospital. PMID:5971636

  13. A leading edge heating array and a flat surface heating array - operation, maintenance and repair manual

    NASA Technical Reports Server (NTRS)

    1975-01-01

    A general description of the leading edge/flat surface heating array is presented along with its components, assembly instructions, installation instructions, operation procedures, maintenance instructions, repair procedures, schematics, spare parts lists, engineering drawings of the array, and functional acceptance test log sheets. The proper replacement of components, correct torque values, step-by-step maintenance instructions, and pretest checkouts are described.

  14. Software solutions manage the definition, operation, maintenance and configuration control of the National Ignition Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dobson, D; Churby, A; Krieger, E

    2011-07-25

    The National Ignition Facility (NIF) is the world's largest laser composed of millions of individual parts brought together to form one massive assembly. Maintaining control of the physical definition, status and configuration of this structure is a monumental undertaking yet critical to the validity of the shot experiment data and the safe operation of the facility. The NIF business application suite of software provides the means to effectively manage the definition, build, operation, maintenance and configuration control of all components of the National Ignition Facility. State of the art Computer Aided Design software applications are used to generate a virtualmore » model and assemblies. Engineering bills of material are controlled through the Enterprise Configuration Management System. This data structure is passed to the Enterprise Resource Planning system to create a manufacturing bill of material. Specific parts are serialized then tracked along their entire lifecycle providing visibility to the location and status of optical, target and diagnostic components that are key to assessing pre-shot machine readiness. Nearly forty thousand items requiring preventive, reactive and calibration maintenance are tracked through the System Maintenance & Reliability Tracking application to ensure proper operation. Radiological tracking applications ensure proper stewardship of radiological and hazardous materials and help provide a safe working environment for NIF personnel.« less

  15. EVALUATION OF THE IMPLEMENTATION OF OPERATIONS AND MAINTENANCE PROGRAMS IN NEW JERSEY SCHOOLS

    EPA Science Inventory

    The Asbestos Hazard Emergency Response Act (AHERA) required all schools to develop and implement an asbestos management plan (AMP). The key component of the AMP is the operations and maintenance (O&M) program. A study was conducted to evaluate the implementation of O&M programs a...

  16. Morgantown People Mover (MPM) Operating, Availability, and Maintenance History : October 1976 through June 1978

    DOT National Transportation Integrated Search

    1979-10-01

    The report covers the period of operation, dependability, and maintenance history of the Morgantown system (now known as the Morgantown People Mover - MPM) from October 1976 through June 1978. System performance in general improved greatly during thi...

  17. NHEXAS PHASE I ARIZONA STUDY--STANDARD OPERATING PROCEDURE FOR CALIBRATION, MAINTENANCE AND OPERATION OF ELECTRONIC BALANCES (BCO-L-23.0)

    EPA Science Inventory

    The purpose of this SOP is to describe the general procedures to be followed for the operation, calibration and maintenance of electronic balances. This procedure was followed to ensure consistent data retrieval during the Arizona NHEXAS project and the "Border" study. Keywords: ...

  18. 46 CFR 162.161-5 - Instruction manual for design, installation, operation, and maintenance.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 6 2014-10-01 2014-10-01 false Instruction manual for design, installation, operation, and maintenance. 162.161-5 Section 162.161-5 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Fixed Clean Agent Fire Extinguishing Systems §...

  19. RTEMS Centre - Support and Maintenance Centre to RTEMS Operating System

    NASA Astrophysics Data System (ADS)

    Silva, H.; Constantino, A.; Freitas, D.; Coutinho, M.; Faustino, S.; Mota, M.; Colaço, P.; Sousa, J.; Dias, L.; Damjanovic, B.; Zulianello, M.; Rufino, J.

    2009-05-01

    RTEMS CENTRE - Support and Maintenance Centre to RTEMS Operating System is a joint ESA/Portuguese Task Force initiative to develop a support and maintenance centre to the Real-Time Executive for Multiprocessor Systems (RTEMS). This paper gives a high level visibility of the progress, the results obtained and the future work in the RTEMS CENTRE [6] and in the RTEMS Improvement [7] projects. RTEMS CENTRE started officially in November 2006, with the RTEMS 4.6.99.2 version. A full analysis of RTEMS operating system was produced. The architecture was analysed in terms of conceptual, organizational and operational concepts. The original objectives [1] of the centre were primarily to create and maintain technical expertise and competences in this RTOS, to develop a website to provide the European Space Community an entry point for obtaining support (http://rtemscentre.edisoft.pt), to design, develop, maintain and integrate some RTEMS support tools (Timeline Tool, Configuration and Management Tools), to maintain flight libraries and Board Support Packages, to develop a strong relationship with the World RTEMS Community and finally to produce some considerations in ARINC-653, DO-178B and ECSS E-40 standards. RTEMS Improvement is the continuation of the RTEMS CENTRE. Currently the RTEMS, version 4.8.0, is being facilitated for a future qualification. In this work, the validation material is being produced following the Galileo Software Standards Development Assurance Level B [5]. RTEMS is being completely tested, errors analysed, dead and deactivated code removed and tests produced to achieve 100% statement and decision coverage of source code [2]. The SW to exploit the LEON Memory Management Unit (MMU) hardware will be also added. A brief description of the expected implementations will be given.

  20. Laboratory Activity on Sample Handling and Maintaining a Laboratory Notebook through Simple pH Measurements

    ERIC Educational Resources Information Center

    Erdmann, Mitzy A.; March, Joe L.

    2016-01-01

    Sample handling and laboratory notebook maintenance are necessary skills but can seem abstract if not presented to students in context. An introductory exercise focusing on proper sample handling, data collection and laboratory notebook keeping for the general chemistry laboratory was developed to emphasize the importance of keeping an accurate…

  1. Paranal maintenance and CMMS experience

    NASA Astrophysics Data System (ADS)

    Montano, Nelson

    2004-10-01

    During the last four years of operations, low technical downtime has been one of the relevant records of the Paranal Observatory. From the beginning of the Very Large Telescope (VLT) project, European Southern Observatory (ESO) has considered the implementation of a proper maintenance strategy a fundamental point in order to ensure low technical down time and preserve the Observatory's assets. The implementation of the maintenance strategy was based on the following aspects: - Strong maintenance sense during the design stage. Line Replacement Unit (LRU) concept, standardization and modularity of the Observatory equipment - Creation of a dedicated team for Maintenance - The implementation of a Computerized Maintenance Management System After four operational years, the result of these aspects has exceeded the expectations; the Observatory has been operating with high availability under a sustainable strategy. The strengths of the maintenance strategy have been based on modern maintenance concepts applied by regular production companies, where any minute of down time involves high cost. The operation of the actual Paranal Maintenance System is based mainly on proactive activities, such as regular inspections, preventive maintenance (PM) and predictive maintenance (PdM) plans. Nevertheless, it has been necessary to implement a strong plan for corrective maintenance (CM). The Spare Parts Strategy has also been an important point linked to the Maintenance Strategy and CMMS implementation. At present, almost 4,000 items related to the Observatory spare parts are loaded into the CMMS database. Currently, we are studying the implementation of a Reliability Centered Maintenance (RCM) project in one of our critical systems The following document presents the actual status of the Paranal Maintenance Strategy and which have been the motivations to implement the established strategy.

  2. FUEL HANDLING MECHANISM

    DOEpatents

    Koch, L.J.; Hutter, E.

    1960-02-01

    A remotely operable handling device specifically adapted for the handling of vertically disposed fuel rods in a nuclear reactor was developed. The device consists essentially of an elongated tubular member having a gripping device at the lower end of the pivoted jaw type adapted to grip an enlarged head on the upper end of the workpiece. The device includes a sensing element which engages the enlarged head and is displaced to remotely indicate when the workpiece is in the proper position to be engaged by the jaws.

  3. U.S.-MEXICO BORDER PROGRAM ARIZONA BORDER STUDY--STANDARD OPERATING PROCEDURE FOR STILL OPERATION AND MAINTENANCE (UA-L-3.1)

    EPA Science Inventory

    The purpose of this SOP is to detail the operation and maintenance of the deionized water still during the Arizona NHEXAS project and the Border study. Keywords: lab; equipment; water still.

    The U.S.-Mexico Border Program is sponsored by the Environmental Health Workgroup of t...

  4. Evaluation of the Implementation of Operations and Maintenance Programs in New Jersey Schools.

    ERIC Educational Resources Information Center

    Kominsky, John R.; Freyberg, Ronald W.; Gerber, Donald R.; Centifonti, Gary J.

    All schools are required to develop and implement an asbestos management plan (AMP). The key component of this plan is each school's operations and maintenance (O&M) program. This report outlines the importance of such programs. It describes an O&M program as an administrative framework that prescribes specific activities and work…

  5. Operational Plan for Underground Storage Tank 322 R2U2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Griffin, D.

    2017-06-07

    This Operational Plan provides the operator of the tank system with guidelines relating to the safe and compliant operation and maintenance of the tank system. The tank system schematic and list of emergency contacts shall be posted near the tank so they are visible to tank personnel. This Operational Plan shall be kept on file by the Facility Supervisor. It should be understood when managing this tank system that it is used to store hazardous waste temporarily for 90 calendar days or less. The rinsewater handled in the tank system is considered hazardous and may exhibit the characteristic of toxicity.

  6. HAND TRUCK FOR HANDLING EQUIPMENT

    DOEpatents

    King, D.W.

    1959-02-24

    A truck is described for the handling of large and relatively heavy pieces of equipment and particularly for the handling of ion source units for use in calutrons. The truck includes a chassis and a frame pivoted to the chassis so as to be operable to swing in the manner of a boom. The frame has spaced members so arranged that the device to be handled can be suspended between or passed between these spaced members and also rotated with respect to the frame when the device is secured to the spaced members.

  7. Networks consolidation program: Maintenance and Operations (M&O) staffing estimates

    NASA Technical Reports Server (NTRS)

    Goodwin, J. P.

    1981-01-01

    The Mark IV-A consolidate deep space and high elliptical Earth orbiter (HEEO) missions tracking and implements centralized control and monitoring at the deep space communications complexes (DSCC). One of the objectives of the network design is to reduce maintenance and operations (M&O) costs. To determine if the system design meets this objective an M&O staffing model for Goldstone was developed which was used to estimate the staffing levels required to support the Mark IV-A configuration. The study was performed for the Goldstone complex and the program office translated these estimates for the overseas complexes to derive the network estimates.

  8. 43 CFR 404.55 - Who is responsible for the operation, maintenance, and replacement costs?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Who is responsible for the operation, maintenance, and replacement costs? 404.55 Section 404.55 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM...

  9. Coping with Deferred Maintenance.

    ERIC Educational Resources Information Center

    Suber, L. Terry

    1982-01-01

    The deferred maintenance problem on college and university campuses is addressed. Deferred maintenance refers to larger or more expansive maintenance work that can be delayed and is not performed when needed or reported, usually because its cost is beyond the annual maintenance and operating budget of the physical plant department. Eventually…

  10. Analysis of failure and maintenance experiences of motor operated valves in a Finnish nuclear power plant

    NASA Astrophysics Data System (ADS)

    Simola, Kaisa; Laakso, Kari

    1992-01-01

    Eight years of operating experiences of 104 motor operated closing valves in different safety systems in nuclear power units were analyzed in a systematic way. The qualitative methods used were Failure Mode and Effect Analysis (FMEA) and Maintenance Effects and Criticality Analysis (MECA). These reliability engineering methods are commonly used in the design stage of equipment. The successful application of these methods for analysis and utilization of operating experiences was demonstrated.

  11. Lake Billy Shaw Operations and Maintenance, Final Annual Report 2000.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dodson, Guy; Pero, Vincent

    Lake Billy Shaw is a newly constructed earthen dam reservoir with a surface area of 430 acres. Construction on the dam and structures was complete in November of 1998. The fish screen structures were complete in December of 1998, with initial filling in May 1999. Upon initial filling, dam structures, monitoring wells, fish screen structures, and lake level were monitored daily, with recordings being taken three times/week. During June 1999 the water to the lake was turned off in order to complete additional construction work on the lake. This work included installation of culverts around the perimeter road, installation ofmore » boat launches, finish work on the spillway structure, pumphouse and well protection and planting 4 trees along the entrance to the boat launch area. The water was turned on again in late September 1999 with all structures having been checked, fish screens greased and maintained and well levels being monitored. In 2000 the Operations and Maintenance portion of the project began with monitoring of piezometers, water levels, biological monitoring, riparian plantings, protection of shorelines, and maintenance of structures and appurtances.« less

  12. 25 CFR 171.500 - How does BIA determine the annual operation and maintenance assessment rate for the irrigation...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... costs needed for the reliable operation of the irrigation facility infrastructure; (8) Maintenance of a... 25 Indians 1 2010-04-01 2010-04-01 false How does BIA determine the annual operation and... Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER IRRIGATION OPERATION AND...

  13. Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2005-2006 Annual Progress Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sellman, Jake; Dykstra, Tim

    The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program designed to enhance both subsistence fishing, educational opportunities for Tribal members of the Shoshone-Paiute Tribes, and recreational fishing facilities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program also intends to afford and maintain healthy aquatic conditions for fish growth and survival, to provide superior facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this projectmore » as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was the least productive as a result of high turbidity levels and constraining water quality parameters. Lake Billy Shaw trout were in poorer condition than in previous years potentially as a result of water quality or other factors. Mountain View Reservoir trout exhibit the best health of the three reservoirs and was the only reservoir to receive constant flows of water.« less

  14. Linac cryogenic distribution system maintenance and upgrades at JLab

    NASA Astrophysics Data System (ADS)

    Dixon, K.; Wright, M.; Ganni, V.

    2014-01-01

    The Central Helium Liquefier (CHL) distribution system to the CEBAF and FEL linacs at Jefferson Lab (JLab) experienced a planned warm up during the late summer and fall of 2012 for the first time after its commissioning in 1991. Various maintenance and modifications were performed to support high beam availability to the experimental users, meet 10 CFR 851 requirements for pressure systems, address operational issues, and prepare the cryogenic interfaces for the high-gradient cryomodules needed for the 12 GeV upgrade. Cryogenic maintenance and installation work had to be coordinated with other activities in the linacs and compete for manpower from other department installation activities. With less than a quarter of the gas storage capacity available to handle the boil-off from the more than 40 cryomodules, 35,000 Nm3 of helium was re-liquefied and shipped to a vendor via a liquid tanker trailer. Nearly 200 u-tubes had to be removed and stored while seals were replaced on related equipment such as vacuum pump outs, bayonet isolation and process valves.

  15. 47 CFR 87.69 - Maintenance tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Maintenance tests. 87.69 Section 87.69... Operating Requirements and Procedures Operating Requirements § 87.69 Maintenance tests. The licensee may make routine maintenance tests on equipment other than emergency locator transmitters if there is no...

  16. Operational and maintenance instruction manual for the Ingham County Geriatric Medical Care Facility solar water-heating system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Ingham County solar system consists of approximately 10,000 square feet of solar collectors connected in a closed configuration loop. The primary loop solution is a 1:12 mixture of water and propylene glycol which flows through the tube side of a heat exchanger connected to the primary storage tank. The heat energy which is supplied to the primary storage tank is subsequently used to preheat the temperature of the laundry water, kitchen water, and domestic potable water. Included in this report are: detailed drawings and flow chart; operational methodology; preventive maintenance instructions; general instructions and safety precautions; and a correctivemore » maintenance and tabulation of failure modes. Appendices include: manufacturers technical manual and component specifications; IBM data sensors and responsibilities; digital county monitor operations manual; and on site monitor operations manual. Reference CAPE-2834. (LS)« less

  17. Effects of the European Community directive on lifting and handling practice.

    PubMed

    Docker, S M

    1993-07-01

    The new legislation on lifting and handling requires the application of ergonomic principles to manual handling operations. A written assessment is required for all unavoidable manual handling operations which involve the risk of injury to employees. Employers are now expected to provide equipment to enable staff to avoid lifting heavy loads.

  18. Solar power satellite system definition study. Volume 3: Operations and systems synthesis, phase 2

    NASA Technical Reports Server (NTRS)

    1979-01-01

    The results of the operations analyses are reported. Some of these analyses examined operations aspects of space vehicle in-space maintenance. Many of the analyses explored in great depth operations concerned the LEO Base cargo handling operations. Personnel transportation operations and cargo packaging were also analyzed. These operations analyses were performed to define the operational requirements for all of the SPS system elements so that equipment and facilities could be synthesized, and to make estimates of the manpower requirements. An overall, integrated, end-to-end description of the SPS operations is presented. The detailed operations analyses, upon which this integrated description was based, are included.

  19. FEMA and RAM Analysis for the Multi Canister Overpack (MCO) Handling Machine

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    SWENSON, C.E.

    2000-06-01

    The Failure Modes and Effects Analysis and the Reliability, Availability, and Maintainability Analysis performed for the Multi-Canister Overpack Handling Machine (MHM) has shown that the current design provides for a safe system, but the reliability of the system (primarily due to the complexity of the interlocks and permissive controls) is relatively low. No specific failure modes were identified where significant consequences to the public occurred, or where significant impact to nearby workers should be expected. The overall reliability calculation for the MHM shows a 98.1 percent probability of operating for eight hours without failure, and an availability of the MHMmore » of 90 percent. The majority of the reliability issues are found in the interlocks and controls. The availability of appropriate spare parts and maintenance personnel, coupled with well written operating procedures, will play a more important role in successful mission completion for the MHM than other less complicated systems.« less

  20. 30 CFR 74.10 - Operating and maintenance instructions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... storage instructions and a maintenance and service life plan with each new CPDM device sold. These... of how the CPDM works; (ii) A schematic diagram of the CPDM; (iii) Procedures for wearing and use of... functioning of the CPDM. (2) The maintenance and service life plan must address: (i) Conditions that should...

  1. Operations and maintenance in the glass container industry

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barbieri, D.; Jacobson, D.

    1999-07-01

    Compressed air is a significant electrical end-use at most manufacturing facilities, and few industries utilize compressed air to the extent of the glass container industry. Unfortunately, compressed air is often a significant source of wasted energy because many customers view it as a low-maintenance system. In the case of the glass container industry, compressed air is a mission-critical system used for driving production machinery, blowing glass, cooling plungers and product, and packaging. Leakage totaling 10% of total compressed air capacity is not uncommon, and leakage rates upwards of 40% have been observed. Even though energy savings from repairing compressed airmore » leaks can be substantial, regular maintenance procedures are often not in place for compressed air systems. In order to achieve future savings in the compressed air end-use, O and M programs must make a special effort to educate customers on the significant energy impacts of regular compressed air system maintenance. This paper will focus on the glass industry, its reliability on compressed air, and the unique savings potential in the glass container industry. Through a technical review of the glass production process, this paper will identify compressed air as a highly significant electrical consumer in these facilities and present ideas on how to produce and deliver compressed air in a more efficient manner. It will also examine a glass container manufacturer with extremely high savings potential in compressed air systems, but little initiative to establish and perform compressed air maintenance due to an if it works, don't mess with it maintenance philosophy. Finally, this paper will address the economic benefit of compressed air maintenance in this and other manufacturing industries.« less

  2. Examining maintenance responsibilities.

    PubMed

    Lam, K C

    2001-06-01

    This paper has examined the important responsibilities of the two organisations involved in the provision of maintenance service for the vital building services in many of our highly serviced buildings. The issues raised could be put to beneficial use in both clients and maintenance providers. All in all, the clients should work closely with their maintenance providers. Engineering services in buildings will not perform satisfactorily and efficiently if both parties do not work together and understand the maintenance tasks based on a business partnering mode. Put forward is the view that the management of the activities involved in the operation and maintenance process is a "shared commitment/involvement" between the client and the maintenance provider. It is obvious that many factors can influence the continued effectiveness of a quality maintenance scheme set up by client and provider. Some of these factors are: Change in key personnel Updates in technology Amendments to engineering practice Implementation of legislative requirements Changes in operation by client or provider Change of use of building Passage of time These factors must be fully reviewed by both parties from time to time, and necessary actions taken. A cooperative team working relationship and improved communication should be fostered by the client and his provider for the best management of services maintenance. This arrangement will contribute to better building services systems with continuous improvement; improved value for clients and higher return for the maintenance provider.

  3. Feasibility study for a transportation operations system cask maintenance facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rennich, M.J.; Medley, L.G.; Attaway, C.R.

    The US Department of Energy (DOE), Office of Civilian Radioactive Waste Management (OCRWM) is responsible for the development of a waste management program for the disposition of spent nuclear fuel (SNF) and high-level waste (HLW). The program will include a transportation system for moving the nuclear waste from the sources to a geologic repository for permanent disposal. Specially designed casks will be used to safely transport the waste. The cask systems must be operated within limits imposed by DOE, the Nuclear Regulatory Commission (NRC), and the Department of Transportation (DOT). A dedicated facility for inspecting, testing, and maintaining the caskmore » systems was recommended by the General Accounting Office (in 1979) as the best means of assuring their operational effectiveness and safety, as well as regulatory compliance. In November of 1987, OCRWM requested a feasibility study be made of a Cask Maintenance Facility (CMF) that would perform the required functions. 46 refs., 16 figs., 13 tabs.« less

  4. Umatilla Hatchery Satellite Facilities Operation and Maintenance; 1996 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rowan, Gerald D.

    1997-06-01

    The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) and Oregon Department of Fish and Wildlife (ODFW) are cooperating in a joint effort to enhance steelhead and re-establish salmon runs in the Umatilla River Basin. As an integral part of this program, Bonifer Pond, Minthorn Springs, Imeques C-mem-ini-kem and Thornhollow satellite facilities are operated for acclimation and release of juvenile summer steelhead (Oncorhynchus mykiss), fall and spring chinook salmon (O. tshawytscha) and coho salmon (O. kisutch). Minthorn is also used for holding and spawning adult summer steelhead and Three Mile Dam is used for holding and spawning adult fall chinookmore » and coho salmon. Bonifer, Minthorn, Imeques and Thornhollow facilities are operated for acclimation and release of juvenile salmon and summer steelhead. The main goal of acclimation is to reduce stress from trucking prior to release and improve imprinting of juvenile salmonids in the Umatilla River Basin. Juveniles are transported to the acclimation facilities primarily from Umatilla and Bonneville Hatcheries. This report details activities associated with operation and maintenance of the Bonifer, Minthorn, Imeques, Thornhollow and Three Mile Dam facilities in 1996.« less

  5. User Charge Revenues for Wastewater Treatment Plants--Insufficient to Cover Operation and Maintenance.

    DTIC Science & Technology

    1981-12-02

    audits of construction grants, a review of user charge system adequacy, including a review of the adequacy of reserve accounts for replacing major...recommendation to incorporate, as part of existing operation and and maintenance inspections and closeout financial audits of construction grants, a...determination to be made in an audit is whether the facility was constructed in conformance with approved plans and specifications and whether it meets

  6. NHEXAS PHASE I ARIZONA STUDY--STANDARD OPERATING PROCEDURE FOR OPERATION AND MAINTENANCE OF COMPUTER EQUIPMENT FOR IIT NHEXAS (IIT-A-1.0)

    EPA Science Inventory

    The purpose of this SOP is to describe the procedures for using and maintaining the related microcomputer equipment at the Illinois Institute of Technology (IIT)/NHEXAS site. These methods were used in all data operations and maintenance routines during the NHEXAS project and th...

  7. Duck Valley Reservoirs Fish Stocking and Operation and Maintenance, 2006-2007 Annual Progress Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sellman, Jake; Dykstra, Tim

    The Duck Valley Reservoirs Fish Stocking and Operations and Maintenance (DV Fisheries) project is an ongoing resident fish program that serves to partially mitigate the loss of anadromous fish that resulted from downstream construction of the hydropower system. The project's goals are to enhance subsistence fishing and educational opportunities for Tribal members of the Shoshone-Paiute Tribes and provide resident fishing opportunities for non-Tribal members. In addition to stocking rainbow trout (Oncorhynchus mykiss) in Mountain View, Lake Billy Shaw, and Sheep Creek Reservoirs, the program is also designed to maintain healthy aquatic conditions for fish growth and survival, to provide superiormore » facilities with wilderness qualities to attract non-Tribal angler use, and to offer clear, consistent communication with the Tribal community about this project as well as outreach and education within the region and the local community. Tasks for this performance period are divided into operations and maintenance plus monitoring and evaluation. Operation and maintenance of the three reservoirs include fences, roads, dams and all reservoir structures, feeder canals, water troughs and stock ponds, educational signs, vehicles and equipment, and outhouses. Monitoring and evaluation activities included creel, gillnet, wildlife, and bird surveys, water quality and reservoir structures monitoring, native vegetation planting, photo point documentation, control of encroaching exotic vegetation, and community outreach and education. The three reservoirs are monitored in terms of water quality and fishery success. Sheep Creek Reservoir was very unproductive this year as a fishery. Fish morphometric and water quality data indicate that the turbidity is severely impacting trout survival. Lake Billy Shaw was very productive as a fishery and received good ratings from anglers. Mountain View was also productive and anglers reported a high number of quality sized fish. Water quality

  8. 40 CFR 65.161 - Continuous records and monitoring system data handling.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Routing to a Fuel Gas System or a Process § 65.161 Continuous records and monitoring system data handling...) Monitoring system breakdowns, repairs, preventive maintenance, calibration checks, and zero (low-level) and... section unless an alternative monitoring or recordkeeping system has been requested and approved under...

  9. 40 CFR 65.161 - Continuous records and monitoring system data handling.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Routing to a Fuel Gas System or a Process § 65.161 Continuous records and monitoring system data handling...) Monitoring system breakdowns, repairs, preventive maintenance, calibration checks, and zero (low-level) and... section unless an alternative monitoring or recordkeeping system has been requested and approved under...

  10. Artificial intelligence for turboprop engine maintenance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-01-01

    Long-term maintenance operations, causing the unit to out of action, may seem economical - but they result in reduced operating readiness. Offsetting that concern, careless, hurried maintenance reduces margins of safety and reliability. Any tool that improves maintenance without causing a sharp increase in cost is valuable. Artificial intelligence (AI) is one of the tools. Expert system and neural networks are two different areas of AI that show promise for turboprop engine maintenance.

  11. Using RFID Tagging in a Mining Industry Maintenance, Repair, and Operating (MRO) Supply Warehouse: A Case Study

    ERIC Educational Resources Information Center

    Smith, George D.

    2008-01-01

    The use of Radio Frequency Identification (RFID) technology has been shown to be successful by reducing operating costs in the retail and manufacturing industries, but has never been considered in the literature for a mining industry maintenance, repair, and operating (MRO) supply chain. This field study was conducted to determine whether or not…

  12. The use of emulator-based simulators for on-board software maintenance

    NASA Astrophysics Data System (ADS)

    Irvine, M. M.; Dartnell, A.

    2002-07-01

    Traditionally, onboard software maintenance activities within the space sector are performed using hardware-based facilities. These facilities are developed around the use of hardware emulation or breadboards containing target processors. Some sort of environment is provided around the hardware to support the maintenance actives. However, these environments are not easy to use to set-up the required test scenarios, particularly when the onboard software executes in a dynamic I/O environment, e.g. attitude control software, or data handling software. In addition, the hardware and/or environment may not support the test set-up required during investigations into software anomalies, e.g. raise spurious interrupt, fail memory, etc, and the overall "visibility" of the software executing may be limited. The Software Maintenance Simulator (SOMSIM) is a tool that can support the traditional maintenance facilities. The following list contains some of the main benefits that SOMSIM can provide: Low cost flexible extension to existing product - operational simulator containing software processor emulator; System-level high-fidelity test-bed in which software "executes"; Provides a high degree of control/configuration over the entire "system", including contingency conditions perhaps not possible with real hardware; High visibility and control over execution of emulated software. This paper describes the SOMSIM concept in more detail, and also describes the SOMSIM study being carried out for ESA/ESOC by VEGA IT GmbH.

  13. MHSS: a material handling system simulator

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pomernacki, L.; Hollstien, R.B.

    1976-04-07

    A Material Handling System Simulator (MHSS) program is described that provides specialized functional blocks for modeling and simulation of nuclear material handling systems. Models of nuclear fuel fabrication plants may be built using functional blocks that simulate material receiving, storage, transport, inventory, processing, and shipping operations as well as the control and reporting tasks of operators or on-line computers. Blocks are also provided that allow the user to observe and gather statistical information on the dynamic behavior of simulated plants over single or replicated runs. Although it is currently being developed for the nuclear materials handling application, MHSS can bemore » adapted to other industries in which material accountability is important. In this paper, emphasis is on the simulation methodology of the MHSS program with application to the nuclear material safeguards problem. (auth)« less

  14. Storage and handling of aviation fuels at airports

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-01-01

    This standard covers the basic principles for the design of fuel handling facilities and equipment at airports. It provides a reference for the planning and operation of aviation fuel handling facilities and associated equipment.

  15. An Exposure Prevention Plan for an Anhydrous Ammonia Handling System

    NASA Technical Reports Server (NTRS)

    Padolewski, Cathy L.; Bower, Amy; Ponikvar, Gary; Mellott, Ken

    1997-01-01

    In July of 1996, the Industrial Hygiene Team of the Environmental Management Office at NASA Lewis Research Center was contacted by the Space Station Program Office to conduct ammonia awareness training for a team of engineers and technicians. The team was tasked with assembling and operating an ammonia handling system for testing of a photovoltaic radiator at the NASA Plum Brook Station Space Power Facility. The ammonia handling system supports a radiator designed to radiate excess heat from a photovoltaic array module used to provide power to the International Space Station. The system would consist of a hazardous materials trailer equipped with an anhydrous ammonia tank, heater, accumulator, chiller, and flow bench. Meetings were held with representatives from the Space Station Program Office, the engineers and Plum Brook safety personnel. Guidance was also provided by representatives from Kennedy Space Center. Determinations were made concerning the locations and types of potential exposures and a plan was developed which included training, personal protective equipment, engineering controls and emergency response. Various organizations including the Plum Brook Safety Committee, the Lewis Environmental Management Office, the Test Readiness Review Board and the Program Office all had requirements that had to be met in order to satisfy themselves that all personnel involved in the operation of the system would be safe. What resulted was a comprehensive plan that provided more than adequate safety measures and succeeded in protecting all personnel from the hazards of the ammonia system. Testing of the photovoltaic radiator was successful and although ammonia leaks were detected and maintenance of the system was ongoing, no one was injured. It was felt that the training and controls in place allowed for a comfort level that did not interfere with the operations.

  16. Estimating cost per lane mile for routine highway operations and maintenance

    DOT National Transportation Integrated Search

    2011-01-01

    The disparity between maintenance budgets and maintenance requirements causes agencies to make difficult choices : about maintenance priorities. There is a growing need to effectively link maintenance costs and condition to provide clear : evidence o...

  17. Nicotine enhances operant responding for qualitatively distinct reinforcers under maintenance and extinction conditions.

    PubMed

    Barret, Scott T; Bevins, Rick A

    2013-12-01

    Nicotine enhancement of reward has been implicated as an important contributor to tobacco addiction. Despite the attention that reward enhancement has received, the behavioral mechanisms whereby nicotine enhances operant responding remain largely unknown. The present study sought to extend previous work by evaluating the effects of nicotine on responding for two qualitatively different rewards (visual stimulation (VS) and 4% sucrose solution) under fixed-ratio (FR) maintenance and extinction conditions. Sprague–Dawley rats were trained to press an active lever for VS (Experiment 1) or 4% sucrose solution (Experiment 2) and evaluated over 15 sessions on a FR5 schedule of reinforcement. Nicotine (0.4 mg base/kg, SC) or saline were administered 5 min before each session; the alternate solution was given in the home cage after the session. The effects of nicotine on extinction responding were then assessed over 5 sessions and rats were divided into 4 groups based on drug of injection received during FR-maintenance and extinction phases (maintenance–extinction): Nic–Nic, Nic–Sal, Sal–Sal, and Sal–Nic. Nicotine increased active lever response rates for both VS and 4% sucrose under FR5 maintenance conditions. Nicotine also increased response rates in the Nic–Nic group relative to all other groups under extinction conditions in both experiments, though this effect had greater longevity following VS maintenance conditions than sucrose. Enhancement of responding during extinction does not appear dependent upon locomotor activation by nicotine.

  18. Laboratory services series: a programmed maintenance system

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tuxbury, D.C.; Srite, B.E.

    1980-01-01

    The diverse facilities, operations and equipment at a major national research and development laboratory require a systematic, analytical approach to operating equipment maintenance. A computer-scheduled preventive maintenance program is described including program development, equipment identification, maintenance and inspection instructions, scheduling, personnel, and equipment history.

  19. 14 CFR 91.421 - Rebuilt engine maintenance records.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Rebuilt engine maintenance records. 91.421..., Preventive Maintenance, and Alterations § 91.421 Rebuilt engine maintenance records. (a) The owner or operator may use a new maintenance record, without previous operating history, for an aircraft engine...

  20. 14 CFR 91.421 - Rebuilt engine maintenance records.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 2 2012-01-01 2012-01-01 false Rebuilt engine maintenance records. 91.421..., Preventive Maintenance, and Alterations § 91.421 Rebuilt engine maintenance records. (a) The owner or operator may use a new maintenance record, without previous operating history, for an aircraft engine...

  1. WASTE HANDLING BUILDING ELECTRICAL SYSTEM DESCRIPTION DOCUMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    S.C. Khamamkar

    2000-06-23

    The Waste Handling Building Electrical System performs the function of receiving, distributing, transforming, monitoring, and controlling AC and DC power to all waste handling building electrical loads. The system distributes normal electrical power to support all loads that are within the Waste Handling Building (WHB). The system also generates and distributes emergency power to support designated emergency loads within the WHB within specified time limits. The system provides the capability to transfer between normal and emergency power. The system provides emergency power via independent and physically separated distribution feeds from the normal supply. The designated emergency electrical equipment will bemore » designed to operate during and after design basis events (DBEs). The system also provides lighting, grounding, and lightning protection for the Waste Handling Building. The system is located in the Waste Handling Building System. The system consists of a diesel generator, power distribution cables, transformers, switch gear, motor controllers, power panel boards, lighting panel boards, lighting equipment, lightning protection equipment, control cabling, and grounding system. Emergency power is generated with a diesel generator located in a QL-2 structure and connected to the QL-2 bus. The Waste Handling Building Electrical System distributes and controls primary power to acceptable industry standards, and with a dependability compatible with waste handling building reliability objectives for non-safety electrical loads. It also generates and distributes emergency power to the designated emergency loads. The Waste Handling Building Electrical System receives power from the Site Electrical Power System. The primary material handling power interfaces include the Carrier/Cask Handling System, Canister Transfer System, Assembly Transfer System, Waste Package Remediation System, and Disposal Container Handling Systems. The system interfaces with the MGR

  2. NHEXAS PHASE I ARIZONA STUDY--STANDARD OPERATING PROCEDURE FOR OPERATION AND MAINTENANCE OF THE LAN AND RELATED MICROCOMPUTER ENVIRONMENT (UA-D-1.1)

    EPA Science Inventory

    The purpose of this SOP is to describe procedures for using and maintaining the local area network (LAN) and related microcomputer equipment at the HRP Site of the Arizona Prevention Center. These methods were used for all data operations and maintenance routines during the Ariz...

  3. A Planned Preventive Maintenance Program. A Handbook for Chief Business Officers and Supervisors of Maintenance with Suggestions on Maintenance for Consideration by Presidents of Higher Institutions.

    ERIC Educational Resources Information Center

    Daniel, Clarence H.

    This handbook explains planned preventive maintenance program, which is an operational system of maintenance designed to increase the effectiveness of the maintenance staff and the use of maintenance funds through efficient scheduling of inspections and follow-through of work to be performed. Sections are included for the chief administrative…

  4. Community College Finance: A Cost Analysis of Community College Expenditures Related to Maintenance and Operations

    ERIC Educational Resources Information Center

    Collins, Michael T.

    2011-01-01

    The purpose of this study is to develop a costing model for maintenance and operations expenditures among 16 single-campus California community college districts and assess the impact of a variety of variables including size of student enrollment, physical plant age, acreage, gross square footage, and general obligation facility bonds on district…

  5. Structural health and prognostics management for the enhancement of offshore wind turbine operations and maintenance strategies

    DOE PAGES

    Griffith, D. Todd; Yoder, Nathanael C.; Resor, Brian; ...

    2013-09-19

    Offshore wind turbines are an attractive source for clean and renewable energy for reasons including their proximity to population centers and higher capacity factors. One obstacle to the more widespread installation of offshore wind turbines in the USA, however, is that recent projections of offshore operations and maintenance costs vary from two to five times the land-based costs. One way in which these costs could be reduced is through use of a structural health and prognostics management (SHPM) system as part of a condition-based maintenance paradigm with smart loads management. Our paper contributes to the development of such strategies bymore » developing an initial roadmap for SHPM, with application to the blades. One of the key elements of the approach is a multiscale simulation approach developed to identify how the underlying physics of the system are affected by the presence of damage and how these changes manifest themselves in the operational response of a full turbine. A case study of a trailing edge disbond is analysed to demonstrate the multiscale sensitivity of damage approach and to show the potential life extension and increased energy capture that can be achieved using simple changes in the overall turbine control and loads management strategy. Finally, the integration of health monitoring information, economic considerations such as repair costs versus state of health, and a smart loads management methodology provides an initial roadmap for reducing operations and maintenance costs for offshore wind farms while increasing turbine availability and overall profit.« less

  6. Test, Control and Monitor System maintenance plan

    NASA Technical Reports Server (NTRS)

    Buehler, David P.; Lougheed, M. J.

    1993-01-01

    The maintenance requirements for Test, Control, and Monitor System (TCMS) and the method for satisfying these requirements prior to First Need Date (FND) of the last TCMS set are described. The method for satisfying maintenance requirements following FND of the last TCMS set will be addressed by a revision to this plan. This maintenance plan serves as the basic planning document for maintenance of this equipment by the NASA Payloads Directorate (CM) and the Payload Ground Operations Contractor (PGOC) at KSC. The terms TCMS Operations and Maintenance (O&M), Payloads Logistics, TCMS Sustaining Engineering, Payload Communications, and Integrated Network Services refer to the appropriate NASA and PGOC organization. For the duration of their contract, the Core Electronic Contractor (CEC) will provide a Set Support Team (SST). One of the primary purposes of this team is to help NASA and PGOC operate and maintain TCMS. It is assumed that SST is an integral part of TCMS O&M. The purpose of this plan is to describe the maintenance concept for TCMS hardware and system software in order to facilitate activation, transition planning, and continuing operation. When software maintenance is mentioned in this plan, it refers to maintenance of TCMS system software.

  7. Preventive Maintenance. FMO: Fundamentals of Machine Operation. Third Edition.

    ERIC Educational Resources Information Center

    Hathaway, Louis

    This text is intended to provide students with basic information on conducting preventive maintenance on agricultural machinery. The following topics are covered in the individual chapters: the importance of preventive maintenance and recommended service intervals; engine intake and exhaust systems (air cleaners, turbochargers, intake and exhaust…

  8. New Best-Practices Guide for Photovoltaic System Operations and Maintenance

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fact sheet summarizing technical report TP-7A40-67553. As solar photovoltaic (PV) systems have continued their transition from niche applications into large, mature markets in the United States, their potential as financial investments has risen accordingly. Mainstream investors, however, need to feel confident about the risk and return of solar photovoltaic (PV) systems before committing funds. A major influence on risk and return for PV is operations and maintenance (O&M) - but O&M practices and costs vary widely across the United States, making these variables difficult for investors to predict. To address this barrier to continued PV investment, the PV O&M Workingmore » Group has developed a new best-practices guide for PV O&M.« less

  9. Afghan National Security Forces Facilities: Concerns with Funding, Oversight, and Sustainability for Operation and Maintenance

    DTIC Science & Technology

    2012-10-01

    facilities, such as water supply, waste water treatment , and power generation.  The Ministry of Defense’s procurement process is unable to provide the...the Joint Regional Afghanistan Security Forces Compound Water Treatment System...Ministry of Interior NTM-A North Atlantic Treaty Organization Training Mission-Afghanistan O&M operation and maintenance PCO Primary Contracting Officer

  10. Reduction of Maintenance Error Through Focused Interventions

    NASA Technical Reports Server (NTRS)

    Kanki, Barbara G.; Walter, Diane; Rosekind, Mark R. (Technical Monitor)

    1997-01-01

    It is well known that a significant proportion of aviation accidents and incidents are tied to human error. In flight operations, research of operational errors has shown that so-called "pilot error" often involves a variety of human factors issues and not a simple lack of individual technical skills. In aircraft maintenance operations, there is similar concern that maintenance errors which may lead to incidents and accidents are related to a large variety of human factors issues. Although maintenance error data and research are limited, industry initiatives involving human factors training in maintenance have become increasingly accepted as one type of maintenance error intervention. Conscientious efforts have been made in re-inventing the "team" concept for maintenance operations and in tailoring programs to fit the needs of technical operations. Nevertheless, there remains a dual challenge: to develop human factors interventions which are directly supported by reliable human error data, and to integrate human factors concepts into the procedures and practices of everyday technical tasks. In this paper, we describe several varieties of human factors interventions and focus on two specific alternatives which target problems related to procedures and practices; namely, 1) structured on-the-job training and 2) procedure re-design. We hope to demonstrate that the key to leveraging the impact of these solutions comes from focused interventions; that is, interventions which are derived from a clear understanding of specific maintenance errors, their operational context and human factors components.

  11. Final Environmental Impact Statement. Ontonagon Harbor Operation and Maintenance Activities. Ontonagon County, Michigan.

    DTIC Science & Technology

    1975-08-01

    Paul, Minnesota 55101 August 1975 ,.’U * - S • S S S S S • S U U FIN"L ENVIRONMENTAL IMPACT STATEMENT OPERATION AND MAINTENANCE ACTIVITIES ONTONAGON...HARBOR, MICHIGAN LAKE SUPERIOR Responsible Office: St. Paul District, Corps of Engineers, 1135 U.S. Post Office and Custom House, St. Paul, Minnesota ... mining is present at White Pine, 12 air miles southwest of Ontonagon Harbor. 6 2.130 Topography. - The area’s topography is directly related to the

  12. Development of ergonomics audits for bagging, haul truck and maintenance and repair operations in mining.

    PubMed

    Dempsey, Patrick G; Pollard, Jonisha; Porter, William L; Mayton, Alan; Heberger, John R; Gallagher, Sean; Reardon, Leanna; Drury, Colin G

    2017-12-01

    The development and testing of ergonomics and safety audits for small and bulk bag filling, haul truck and maintenance and repair operations in coal preparation and mineral processing plants found at surface mine sites is described. The content for the audits was derived from diverse sources of information on ergonomics and safety deficiencies including: analysis of injury, illness and fatality data and reports; task analysis; empirical laboratory studies of particular tasks; field studies and observations at mine sites; and maintenance records. These diverse sources of information were utilised to establish construct validity of the modular audits that were developed for use by mine safety personnel. User and interrater reliability testing was carried out prior to finalising the audits. The audits can be implemented using downloadable paper versions or with a free mobile NIOSH-developed Android application called ErgoMine. Practitioner Summary: The methodology used to develop ergonomics audits for three types of mining operations is described. Various sources of audit content are compared and contrasted to serve as a guide for developing ergonomics audits for other occupational contexts.

  13. 14 CFR 91.1433 - CAMP: Maintenance and preventive maintenance training program.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ..., DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT RULES Fractional Ownership Operations Program Management § 91.1433 CAMP: Maintenance and preventive... each person (including inspection personnel) who determines the adequacy of work done is fully informed...

  14. NHEXAS PHASE I ARIZONA STUDY--STANDARD OPERATING PROCEDURE FOR OPERATION, CALIBRATION AND MAINTENANCE OF FIXED AND ADJUSTABLE VOLUME PIPETTE GUNS (BCO-L-9.0)

    EPA Science Inventory

    The purpose of this SOP is to describe the general procedures for the operation, calibration, and maintenance of fixed- and adjustable-volume pipette guns. This procedure was followed to ensure consistent data retrieval during the Arizona NHEXAS project and the "Border" study. Ke...

  15. Quantifying uncertainty in real time performance measurement for highway winter maintenance operations - phase 2 : [tech transfer summary].

    DOT National Transportation Integrated Search

    2014-10-01

    Winter weather in Iowa is often unpredictable and can have a large : impact on traffic flow. The Iowa Department of Transportation (DOT) : attempts to lessen the impact of winter weather events on traffic speeds : with various maintenance operations....

  16. 25 CFR 171.510 - How does BIA calculate my annual operation and maintenance assessment if supplemental water is...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ...? 171.510 Section 171.510 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER IRRIGATION OPERATION AND MAINTENANCE Financial Matters: Assessments, Billing, and Collections § 171.510 How...

  17. Robotics for Nuclear Material Handling at LANL:Capabilities and Needs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harden, Troy A; Lloyd, Jane A; Turner, Cameron J

    Nuclear material processing operations present numerous challenges for effective automation. Confined spaces, hazardous materials and processes, particulate contamination, radiation sources, and corrosive chemical operations are but a few of the significant hazards. However, automated systems represent a significant safety advance when deployed in place of manual tasks performed by human workers. The replacement of manual operations with automated systems has been desirable for nearly 40 years, yet only recently are automated systems becoming increasingly common for nuclear materials handling applications. This paper reviews several automation systems which are deployed or about to be deployed at Los Alamos National Laboratory formore » nuclear material handling operations. Highlighted are the current social and technological challenges faced in deploying automated systems into hazardous material handling environments and the opportunities for future innovations.« less

  18. Improved Procedures for Formulation and Execution of Operations and Maintenance Budgets for Logistic Resources.

    DTIC Science & Technology

    1979-09-01

    1 The Overlapping DoD 3-Year Budget Cycle ( Fiscal Years 1978, 1979, and 1980) ......... . 17 2 The Army, Navy, and Air Force Operations and...Maintenance Appropriations by Budget Activity - Fiscal Year 1979 ......................... . 20 3 Military Service Committee Structures for Implementing Service...Comparison of POM, PDM, and APDM Fiscal Levels With President’s FY 80 Budget Submission to Congress . . 80 17 Reconciling the Army FY 80 O&M Budget from

  19. 7 CFR 58.443 - Whey handling.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., GENERAL SPECIFICATIONS FOR APPROVED PLANTS AND STANDARDS FOR GRADES OF DAIRY PRODUCTS 1 General Specifications for Dairy Plants Approved for USDA Inspection and Grading Service 1 Operations and Operating... objectionable odors. (b) Whey or whey products intended for human food shall at all times be handled in a...

  20. 47 CFR 80.96 - Maintenance tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Maintenance tests. 80.96 Section 80.96 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Operating Requirements and Procedures Operating Procedures-General § 80.96 Maintenance tests. Stations are authorized to...

  1. Applied Operations Research: Operator's Assistant

    NASA Technical Reports Server (NTRS)

    Cole, Stuart K.

    2015-01-01

    NASA operates high value critical equipment (HVCE) that requires trouble shooting, periodic maintenance and continued monitoring by Operations staff. The complexity HVCE and information required to maintain and trouble shoot HVCE to assure continued mission success as paper is voluminous. Training on new HVCE is commensurate with the need for equipment maintenance. LaRC Research Directorate has undertaken a proactive research to support Operations staff by initiation of the development and prototyping an electronic computer based portable maintenance aid (Operator's Assistant). This research established a goal with multiple objectives and a working prototype was developed. The research identified affordable solutions; constraints; demonstrated use of commercial off the shelf software; use of the US Coast Guard maintenance solution; NASA Procedure Representation Language; and the identification of computer system strategies; where these demonstrations and capabilities support the Operator, and maintenance. The results revealed validation against measures of effectiveness and overall proved a substantial training and capability sustainment tool. The research indicated that the OA could be deployed operationally at the LaRC Compressor Station with an expectation of satisfactorily results and to obtain additional lessons learned prior to deployment at other LaRC Research Directorate Facilities. The research revealed projected cost and time savings.

  2. Training for Winter Maintenance Supervisors and Operators.

    DOT National Transportation Integrated Search

    2017-02-02

    Researchers created 22 modules for use in teaching maintenance workers and their supervisors on a variety of topics relating to roadway snow and ice control. The project was funded through the Clear Roads program, and was initiated because every stat...

  3. 46 CFR 154.1850 - Entering cargo handling spaces.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 5 2013-10-01 2013-10-01 false Entering cargo handling spaces. 154.1850 Section 154... cargo handling spaces. (a) The master shall ensure that the ventilation system under § 154.1200 is in operation for 30 minutes before a person enters one of the following: (1) Spaces containing cargo pumps...

  4. 46 CFR 154.1850 - Entering cargo handling spaces.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 5 2012-10-01 2012-10-01 false Entering cargo handling spaces. 154.1850 Section 154... cargo handling spaces. (a) The master shall ensure that the ventilation system under § 154.1200 is in operation for 30 minutes before a person enters one of the following: (1) Spaces containing cargo pumps...

  5. 46 CFR 154.1850 - Entering cargo handling spaces.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Entering cargo handling spaces. 154.1850 Section 154... cargo handling spaces. (a) The master shall ensure that the ventilation system under § 154.1200 is in operation for 30 minutes before a person enters one of the following: (1) Spaces containing cargo pumps...

  6. 46 CFR 154.1850 - Entering cargo handling spaces.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 5 2011-10-01 2011-10-01 false Entering cargo handling spaces. 154.1850 Section 154... cargo handling spaces. (a) The master shall ensure that the ventilation system under § 154.1200 is in operation for 30 minutes before a person enters one of the following: (1) Spaces containing cargo pumps...

  7. 46 CFR 154.1850 - Entering cargo handling spaces.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 5 2014-10-01 2014-10-01 false Entering cargo handling spaces. 154.1850 Section 154... cargo handling spaces. (a) The master shall ensure that the ventilation system under § 154.1200 is in operation for 30 minutes before a person enters one of the following: (1) Spaces containing cargo pumps...

  8. Robust telerobotics - an integrated system for waste handling, characterization and sorting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Couture, S.A.; Hurd, R.L.; Wilhelmsen, K.C.

    The Mixed Waste Management Facility (MWMF) at the Lawrence Livermore National Laboratory was designed to serve as a national testbed to demonstrate integrated technologies for the treatment of low-level organic mixed waste at a pilot-plant scale. Pilot-scale demonstration serves to bridge the gap between mature, bench-scale proven technologies and full-scale treatment facilities by providing the infrastructure needed to evaluate technologies in an integrated, front-end to back-end facility. Consistent with the intent to focus on technologies that are ready for pilot scale deployment, the front-end handling and feed preparation of incoming waste material has been designed to demonstrate the application ofmore » emerging robotic and remotely operated handling systems. The selection of telerobotics for remote handling in MWMF was made based on a number of factors - personnel protection, waste generation, maturity, cost, flexibility and extendibility. Telerobotics, or shared control of a manipulator by an operator and a computer, provides the flexibility needed to vary the amount of automation or operator intervention according to task complexity. As part of the telerobotics design effort, the technical risk of deploying the technology was reduced through focused developments and demonstrations. The work involved integrating key tools (1) to make a robust telerobotic system that operates at speeds and reliability levels acceptable to waste handling operators and, (2) to demonstrate an efficient operator interface that minimizes the amount of special training and skills needed by the operator. This paper describes the design and operation of the prototype telerobotic waste handling and sorting system that was developed for MWMF.« less

  9. Aviation Maintenance Technology. General. G104 Technical Mechanics. Instructor Material.

    ERIC Educational Resources Information Center

    Oklahoma State Board of Vocational and Technical Education, Stillwater. Curriculum and Instructional Materials Center.

    These instructor materials for an aviation maintenance technology course contain five instructional modules. The modules cover the following topics: performing aircraft ground handling and servicing, using hand and power tools and precision measuring instruments, identifying and selecting aircraft hardware, fabricating and installing rigid and…

  10. Computerizing Maintenance Management Improves School Processes.

    ERIC Educational Resources Information Center

    Conroy, Pat

    2002-01-01

    Describes how a Computerized Maintenance Management System (CMMS), a centralized maintenance operations database that facilitates work order procedures and staff directives, can help individual school campuses and school districts to manage maintenance. Presents the benefits of CMMS and things to consider in CMMS selection. (EV)

  11. Remote-Handled Low-Level Waste Disposal Project Code of Record

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Austad, S. L.; Guillen, L. E.; McKnight, C. W.

    2015-04-01

    The Remote-Handled Low-Level Waste (LLW) Disposal Project addresses an anticipated shortfall in remote-handled LLW disposal capability following cessation of operations at the existing facility, which will continue until it is full or until it must be closed in preparation for final remediation of the Subsurface Disposal Area (approximately at the end of Fiscal Year 2017). Development of a new onsite disposal facility will provide necessary remote-handled LLW disposal capability and will ensure continuity of operations that generate remote-handled LLW. This report documents the Code of Record for design of a new LLW disposal capability. The report is owned by themore » Design Authority, who can authorize revisions and exceptions. This report will be retained for the lifetime of the facility.« less

  12. Multiple-Purpose Project, Osage River Basin, Osage River, Missouri. Harry S. Truman Dam & Reservoir Operation and Maintenance Manual. Appendix VII. Volume 1. Construction Foundation Report.

    DTIC Science & Technology

    1984-01-01

    RIVER MISSOURI Report from September 1966 HARRY S. TROMAN DAM & RESERVOIR November 1979 OPERATION AND MAINTENANCE MANUAL 6 PERFORMING DRG. REPORT N4040E...Two of this report ) VII- I- xxiv ............................. .... ... .... ... . .2. . . OPERATION AND MAINTENANCE MANUAL HARRY S. TRUMAN DAM AND...RESERVOIR OSAGE RIVER, MISSOURI APPENDIX VII CONSTRUCTION FOUNDATION REPORT CHAPTER 1 INTRODUCTION 1-01. Location and Description of Project: Harry S

  13. 45 CFR 310.20 - What are the conditions for funding the installation, operation, maintenance and enhancement of...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... installation, operation, maintenance and enhancement of Computerized Tribal IV-D Systems and Office Automation... HEALTH AND HUMAN SERVICES COMPUTERIZED TRIBAL IV-D SYSTEMS AND OFFICE AUTOMATION Funding for Computerized Tribal IV-D Systems and Office Automation § 310.20 What are the conditions for funding the installation...

  14. Administration of Maintenance and Operations in California School Districts: A Handbook for School Administrators and Governing Boards.

    ERIC Educational Resources Information Center

    California State Dept. of Education, Sacramento.

    This handbook provides information that administrators of maintenance and operations in California schools can use in systematically planning and scheduling school facility support services. The first unit, chapter 1, is designed to help members of school district governing boards establish board policies, regulations, and procedures. Topics…

  15. A Training Manual in Conducting a Workshop in the Design, Construction, Operation, Maintenance and Repair of Hydrams.

    ERIC Educational Resources Information Center

    Peace Corps, Washington, DC. Office of Programming and Training Coordination.

    This manual presents a comprehensive training design, suggested procedures, and materials for conducting a workshop in the design, construction, operation, maintenance, and repair of hydrams, and in the planning and implementation of hydram projects. Hydrams (hydraulic rams, hydraulic ram pumps, automatic hydraulic ram pumps, rams) are devices…

  16. 40 CFR 85.1404 - Maintenance of records for urban bus operators; submittal of information; right of entry.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 18 2010-07-01 2010-07-01 false Maintenance of records for urban bus operators; submittal of information; right of entry. 85.1404 Section 85.1404 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM MOBILE...

  17. [A preliminary evaluation of mental status and an investigation of occupational health knowledge demand in operating and maintenance personnel in wind power plants].

    PubMed

    Hu, S Q; Zhang, Q; Zhu, X H; Sun, K; Chen, S Z; Liu, A G; Luo, G L; Huang, W

    2016-10-20

    Objective: To investigate the mental status, level of occupational health knowledge, health behaviors, and occupational health knowledge demand in operating and maintenance personnel in wind power plants, and to provide a basis for formulating protective measures of occupational health for operating and maintenance personnel in wind power plants. Methods: A cluster sampling was performed in regionally representative wind power plants in the wind power industry from May 2014 to June 2015, and the Symptom Checklist-90 (SCL-90) and a self-made evaluation questionnaire were used to investigate the general status, mental health, and occupational health knowledge demand in 160 operating and maintenance workers. Results: Of all respondents, 26.9% had mental health issues. The awareness rate of infectious disease knowledge and preventive measures was 11.9%. Of all workers, 96.5% wanted to know the occupational hazard factors in the workplace, and 96.3% wanted to get the knowledge of the prevention of related diseases. Conclusion: Mental health issues in operating and maintenance personnel in wind power plants cannot be neglected and there is a high demand for occupational health services and related knowledge. Comprehensive intervention measures for health promotion in the workplace should be adopted to improve working environment, enhance individual mental health education, increase the level of occupational health management, and protect the health of workers.

  18. Shuttle Flight Operations Contract Generator Maintenance Facility Land Use Control Implementation Plan (LUCIP)

    NASA Technical Reports Server (NTRS)

    Applegate, Joseph L.

    2014-01-01

    This Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Kennedy Space Center (KSC) Shuttle Flight Operations Contract Generator Maintenance Facility (SFOC; SWMU 081; "the Site") of institutional controls that have been implemented at the Site1. Although there are no current unacceptable risks to human health or the environment associated with the SFOC, an institutional land use control (LUC) is necessary to prevent human health exposure to antimony-affected groundwater at the Site. Controls will include periodic inspection, condition certification, and agency notification.

  19. Operations and maintenance manual for the LDUA supervisory control and data acquisition system (LDUA System 4200) and control network (LDUA System 4400)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barnes, G.A.

    1998-03-11

    This document defines the requirements applicable to the operation, maintenance and storage of the Supervisory Control and Data Acquisition System (SCADAS) and Control Network in support of the Light Duty Utility Arm (LDUA) operations.

  20. 25 CFR 171.565 - How will I know if BIA plans to adjust my annual operation and maintenance assessment rate?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., DEPARTMENT OF THE INTERIOR LAND AND WATER IRRIGATION OPERATION AND MAINTENANCE Financial Matters: Assessments... Register. (b) You may contact the irrigation facility servicing your farm unit. ...

  1. 25 CFR 171.565 - How will I know if BIA plans to adjust my annual operation and maintenance assessment rate?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., DEPARTMENT OF THE INTERIOR LAND AND WATER IRRIGATION OPERATION AND MAINTENANCE Financial Matters: Assessments... Register. (b) You may contact the irrigation facility servicing your farm unit. ...

  2. Operation and Maintenance Manual, TECS 18.

    DTIC Science & Technology

    1978-11-01

    width modulated variable output voltage and frequency using a three-phase transistor bridge circuit . Reduced power line electromagnetic interference...Description 3-1 Section II. Circuit Fundamentals 3-1 Section III. System Description 3-2 CHAPTER 4. Protection and Maintenance 4-1 Section I. Internal...Number I-la TECS 18 Electronic Module Location-Evaporator Side 1-3 1-lb TECS 18 Electronic Module Location-Condenser Side 1-4 1-2 Remote Control Panel 1-5

  3. Reliability-centered maintenance for ground-based large optical telescopes and radio antenna arrays

    NASA Astrophysics Data System (ADS)

    Marchiori, G.; Formentin, F.; Rampini, F.

    2014-07-01

    In the last years, EIE GROUP has been more and more involved in large optical telescopes and radio antennas array projects. In this frame, the paper describes a fundamental aspect of the Logistic Support Analysis (LSA) process, that is the application of the Reliability-Centered Maintenance (RCM) methodology for the generation of maintenance plans for ground-based large optical telescopes and radio antennas arrays. This helps maintenance engineers to make sure that the telescopes continue to work properly, doing what their users require them to do in their present operating conditions. The main objective of the RCM process is to establish the complete maintenance regime, with the safe minimum required maintenance, carried out without any risk to personnel, telescope and subsystems. At the same time, a correct application of the RCM allows to increase the cost effectiveness, telescope uptime and items availability, and to provide greater understanding of the level of risk that the organization is managing. At the same time, engineers shall make a great effort since the initial phase of the project to obtain a telescope requiring easy maintenance activities and simple replacement of the major assemblies, taking special care on the accesses design and items location, implementation and design of special lifting equipment and handling devices for the heavy items. This maintenance engineering framework is based on seven points, which lead to the main steps of the RCM program. The initial steps of the RCM process consist of: system selection and data collection (MTBF, MTTR, etc.), definition of system boundaries and operating context, telescope description with the use of functional block diagrams, and the running of a FMECA to address the dominant causes of equipment failure and to lay down the Critical Items List. In the second part of the process the RCM logic is applied, which helps to determine the appropriate maintenance tasks for each identified failure mode. Once

  4. 14 CFR 147.38 - Maintenance of curriculum requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES AVIATION MAINTENANCE TECHNICIAN SCHOOLS Operating Rules § 147.38 Maintenance of curriculum requirements. (a) Each certificated aviation maintenance technician...

  5. 40 CFR 63.2164 - If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 12 2011-07-01 2009-07-01 true If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance requirements? 63.2164 Section 63.2164 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR...

  6. 14 CFR 145.217 - Contract maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Contract maintenance. 145.217 Section 145...) SCHOOLS AND OTHER CERTIFICATED AGENCIES REPAIR STATIONS Operating Rules § 145.217 Contract maintenance. (a) A certificated repair station may contract a maintenance function pertaining to an article to an...

  7. General aviation avionics equipment maintenance

    NASA Technical Reports Server (NTRS)

    Parker, C. D.; Tommerdahl, J. B.

    1978-01-01

    Maintenance of general aviation avionics equipment was investigated with emphasis on single engine and light twin engine general aviation aircraft. Factors considered include the regulatory agencies, avionics manufacturers, avionics repair stations, the statistical character of the general aviation community, and owners and operators. The maintenance, environment, and performance, repair costs, and reliability of avionics were defined. It is concluded that a significant economic stratification is reflected in the maintenance problems encountered, that careful attention to installations and use practices can have a very positive impact on maintenance problems, and that new technologies and a general growth in general aviation will impact maintenance.

  8. U.S.-MEXICO BORDER PROGRAM ARIZONA BORDER STUDY--STANDARD OPERATING PROCEDURE FOR OPERATION AND MAINTENANCE OF RELATED COMPUTER EQUIPMENT FOR IIT NHEXAS (IIT-A-1.0)

    EPA Science Inventory

    The purpose of this SOP is to describe the procedures for using and maintaining the related microcomputer equipment at the Illinois Institute of Technology (IIT)/NHEXAS site. These methods were used in all data operations and maintenance routines during the Arizona NHEXAS projec...

  9. Grand Traverse Bay, Houghton County, Michigan, Lake Superior, Operation and Maintenance Activities, Environmental Assessment Report.

    DTIC Science & Technology

    1975-05-01

    Paul District, Corps of Engineers St. Paul, Minnesota ENVIRONMENTAL ASSESSMENT REPORT OPERATION AND MAINTENANCE ACTIVITIES GRAND TRAVERSE BAY HARBOR...drift is from north to south. The shoreline north of the harbor is covered with copper mine tailings transported by littoral currents and wave action...from the Gay Mine tailings deposits located about 4 miles north of the harbor. 1.830 Dredge Material Disposal - The U.S. Environmental Protection

  10. Orion Entry Handling Qualities Assessments

    NASA Technical Reports Server (NTRS)

    Bihari, B.; Tiggers, M.; Strahan, A.; Gonzalez, R.; Sullivan, K.; Stephens, J. P.; Hart, J.; Law, H., III; Bilimoria, K.; Bailey, R.

    2011-01-01

    The Orion Command Module (CM) is a capsule designed to bring crew back from the International Space Station (ISS), the moon and beyond. The atmospheric entry portion of the flight is deigned to be flown in autopilot mode for nominal situations. However, there exists the possibility for the crew to take over manual control in off-nominal situations. In these instances, the spacecraft must meet specific handling qualities criteria. To address these criteria two separate assessments of the Orion CM s entry Handling Qualities (HQ) were conducted at NASA s Johnson Space Center (JSC) using the Cooper-Harper scale (Cooper & Harper, 1969). These assessments were conducted in the summers of 2008 and 2010 using the Advanced NASA Technology Architecture for Exploration Studies (ANTARES) six degree of freedom, high fidelity Guidance, Navigation, and Control (GN&C) simulation. This paper will address the specifics of the handling qualities criteria, the vehicle configuration, the scenarios flown, the simulation background and setup, crew interfaces and displays, piloting techniques, ratings and crew comments, pre- and post-fight briefings, lessons learned and changes made to improve the overall system performance. The data collection tools, methods, data reduction and output reports will also be discussed. The objective of the 2008 entry HQ assessment was to evaluate the handling qualities of the CM during a lunar skip return. A lunar skip entry case was selected because it was considered the most demanding of all bank control scenarios. Even though skip entry is not planned to be flown manually, it was hypothesized that if a pilot could fly the harder skip entry case, then they could also fly a simpler loads managed or ballistic (constant bank rate command) entry scenario. In addition, with the evaluation set-up of multiple tasks within the entry case, handling qualities ratings collected in the evaluation could be used to assess other scenarios such as the constant bank angle

  11. Ergonomics and comfort in lawn mower handle positioning: An evaluation of handle geometry.

    PubMed

    Lowndes, Bethany R; Heald, Elizabeth A; Hallbeck, M Susan

    2015-11-01

    Hand operation accompanied with any combination of large forces, awkward positions and repetition may lead to upper limb injury or illness and may be exacerbated by vibration. Commercial lawn mowers expose operators to these factors during actuation of hand controls and therefore may be a health concern. A nontraditional lawn mower control system may decrease upper limb illnesses and injuries through more neutral hand and body positioning. This study compared maximum grip strength in twelve different orientations (3 grip spans and 4 positions) and evaluated self-described comfortable handle positions. The results displayed force differences between nontraditional (X) and both vertical (V) and pistol (P) positions (p < 0.0001) and among the different grip spans (p < 0.0001). Based on these results, recommended designs should incorporate a tilt between 45 and 70°, handle rotations between 48 and 78°, and reduced force requirements or decreased grip spans to improve user health and comfort. Copyright © 2015 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  12. 49 CFR 37.203 - Lift maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.203 Lift maintenance. (a) The entity shall establish a system of regular and frequent maintenance checks of lifts sufficient to determine if they are operative... 49 Transportation 1 2010-10-01 2010-10-01 false Lift maintenance. 37.203 Section 37.203...

  13. 49 CFR 37.203 - Lift maintenance.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 1 2011-10-01 2011-10-01 false Lift maintenance. 37.203 Section 37.203... DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.203 Lift maintenance. (a) The entity shall establish a system of regular and frequent maintenance checks of lifts sufficient to determine if they are operative...

  14. Managing Asbestos in Place: A Building Owner's Guide to Operations and Maintenance Programs for Asbestos-Containing Materials.

    ERIC Educational Resources Information Center

    Environmental Protection Agency, Washington, DC.

    Instructions for building owners on the selection and application of appropriate asbestos control and abatement actions are presented in this guidebook. Chapter 1 offers background information on the asbestos problem. Chapter 2 describes the purpose and scope of an operations and maintenance (O&M) program. The third chapter discusses planning…

  15. Data collection system. Volume 1, Overview and operators manual; Volume 2, Maintenance manual; Appendices

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Caudell, R.B.; Bauder, M.E.; Boyer, W.B.

    1993-09-01

    Sandia National Laboratories (SNL) Instrumentation Development Department was tasked by the Defense Nuclear Agency (DNA) to record data on Tektronix RTD720 Digitizers on the HUNTERS TROPHY field test conducted at the Nevada Test Site (NTS) on September 18, 1992. This report contains a overview and description of the computer hardware and software that was used to acquire, reduce, and display the data. The document is divided into two volumes: an overview and operators manual (Volume 1) and a maintenance manual (Volume 2).

  16. Space shuttle data handling and communications considerations.

    NASA Technical Reports Server (NTRS)

    Stoker, C. J.; Minor, R. G.

    1971-01-01

    Operational and development flight instrumentation, data handling subsystems and communication requirements of the space shuttle orbiter are discussed. Emphasis is made on data gathering methods, crew display data, computer processing, recording, and telemetry by means of a digital data bus. Also considered are overall communication conceptual system aspects and design features allowing a proper specification of telemetry encoders and instrumentation recorders. An adaptive bit rate concept is proposed to handle the telemetry bit rates which vary with the amount of operational and experimental data to be transmitted. A split-phase encoding technique is proposed for telemetry to cope with the excessive bit jitter and low bit transition density which may affect television performance.

  17. Budgeting for Solar PV Plant Operations & Maintenance: Practices and Pricing.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Enbar, Nadav; Weng, Dean; Klise, Geoffrey Taylor

    2016-01-01

    With rising grid interconnections of solar photovoltaic (PV) systems, greater attention is being trained on lifecycle performance, reliability, and project economics. Expected to meet production thresholds over a 20-30 year timeframe, PV plants require a steady diet of operations and maintenance (O&M) oversight to meet contractual terms. However, industry best practices are only just beginning to emerge, and O&M budgets—given the arrangement of the solar project value chain—appear to vary widely. Based on insights from in-depth interviews and survey research, this paper presents an overview of the utility-scale PV O&M budgeting process along with guiding rationales, before detailing perspectives onmore » current plant upkeep activities and price points largely in the U.S. It concludes by pondering potential opportunities for improving upon existing O&M budgeting approaches in ways that can benefit the industry at-large.« less

  18. Budgeting for Solar PV Plant Operations & Maintenance: Practices and Pricing.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Enbar, Nadav; Weng, Dean; Klise, Geoffrey Taylor

    2015-12-01

    With rising grid interconnections of solar photovoltaic (PV) systems, greater attention is being trained on lifecycle performance, reliability, and project economics. Expected to meet production thresholds over a 20-30 year timeframe, PV plants require a steady diet of operations and maintenance (O&M) oversight to meet contractual terms. However, industry best practices are only just beginning to emerge, and O&M budgets—given the arrangement of the solar project value chain—appear to vary widely. Based on insights from in-depth interviews and survey research, this paper presents an overview of the utility-scale PV O&M budgeting process along with guiding rationales, before detailing perspectives onmore » current plant upkeep activities and price points largely in the U.S. It concludes by pondering potential opportunities for improving upon existing O&M budgeting approaches in ways that can benefi t the industry at-large.« less

  19. NHEXAS PHASE I ARIZONA STUDY--STANDARD OPERATING PROCEDURE FOR OPERATION, CALIBRATION AND MAINTENANCE OF THE PERKIN-ELMER 1100B ATOMIC ABSORPTION SPECTROMETER (BCO-L-5.1)

    EPA Science Inventory

    The purpose of this SOP is to outline the start-up, calibration, operation, and maintenance procedures for the Perkin-Elmer 5100 PC Atomic Absorption Spectrophotometer (PE 5100). These procedures are used for the determination of the target trace metal, as in soil, house dust, f...

  20. U.S.-MEXICO BORDER PROGRAM ARIZONA BORDER STUDY--STANDARD OPERATING PROCEDURE FOR OPERATION AND MAINTENANCE OF THE LAN AND RELATED MICROCOMPUTER ENVIRONMENT (UA-D-1.1)

    EPA Science Inventory

    The purpose of this SOP is to describe procedures for using and maintaining the local area network (LAN) and related microcomputer equipment at the Health Related Professions site at the University of Arizona. These methods were used for all data operations and maintenance routi...

  1. 14 CFR 171.11 - Maintenance and operations requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Communications Commission's licensing requirements and show that he has the special knowledge and skills needed... maintenance procedures and servicing guides stating the frequency of servicing. (8) Air-ground communications...

  2. 14 CFR 171.11 - Maintenance and operations requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Communications Commission's licensing requirements and show that he has the special knowledge and skills needed... maintenance procedures and servicing guides stating the frequency of servicing. (8) Air-ground communications...

  3. 14 CFR 171.11 - Maintenance and operations requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Communications Commission's licensing requirements and show that he has the special knowledge and skills needed... maintenance procedures and servicing guides stating the frequency of servicing. (8) Air-ground communications...

  4. Development of Handling Qualities Criteria for Rotorcraft with Externally Slung Loads

    NASA Technical Reports Server (NTRS)

    Hoh, Roger H.; Heffley, Robert K.; Mitchell, David G.

    2006-01-01

    Piloted simulations were performed on the NASA-Ames Vertical Motion Simulator (VMS) to explore handling qualities issues for large cargo helicopters, particularly focusing on external slung load operations. The purpose of this work was based upon the need to include handling qualities criteria for cargo helicopters in an upgrade to the U.S. Army's rotorcraft handling qualities specification, Aeronautical Design Standard-33 (ADS-33E-PRF). From the VMS results, handling qualities criteria were developed fro cargo helicopters carrying external slung loads in the degraded visual environment (DVE). If satisfied, these criteria provide assurance that the handling quality rating (HQR) will be 4 or better for operations in the DVE, and with a load mass ratio of 0.33 or less. For lighter loads, flying qualities were found to be less dependent on the load geometry and therefore the significance of the criteria is less. For heavier loads, meeting the criteria ensures the best possible handling qualities, albeit Level 2 for load mass ratios greater than 0.33.

  5. Thermal and mechanical properties of aluminized fabrics for use in ferrous metal handling operations.

    PubMed

    Wren, J E; Scott, W D; Bates, C E

    1977-11-01

    Protective garments are normally worn in molten handling operations to provide some protection against molten metal splashes. These garments are also intended to provide protection against radiant heat, and they should be as heat resistant and comfortable as possible. Asbestos-based fabrics have been employed for many years, but recently some concern has been expressed over possible asbestos exposure. This program was undertaken to explore the ability of several types of fabrics to resist heat transfer during molten metal impact. A molten metal splash test, along with standard methods for determining tensile strength, flame resistance, and abrasion-flexing resistance were used to evaluate several classes of protective fabrics. The results indicate that there are materials available that offer equal or better mechanical properties and thermal protection compared to aluminized asbestos.

  6. 14 CFR 121.374 - Continuous airworthiness maintenance program (CAMP) for two-engine ETOPS.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Continuous airworthiness maintenance...: CERTIFICATION AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Maintenance, Preventive Maintenance, and Alterations § 121.374 Continuous airworthiness maintenance program (CAMP) for two...

  7. 14 CFR 121.374 - Continuous airworthiness maintenance program (CAMP) for two-engine ETOPS.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Continuous airworthiness maintenance...: CERTIFICATION AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Maintenance, Preventive Maintenance, and Alterations § 121.374 Continuous airworthiness maintenance program (CAMP) for two...

  8. 14 CFR 121.374 - Continuous airworthiness maintenance program (CAMP) for two-engine ETOPS.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Continuous airworthiness maintenance...: CERTIFICATION AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Maintenance, Preventive Maintenance, and Alterations § 121.374 Continuous airworthiness maintenance program (CAMP) for two...

  9. 14 CFR 121.374 - Continuous airworthiness maintenance program (CAMP) for two-engine ETOPS.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Continuous airworthiness maintenance...: CERTIFICATION AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Maintenance, Preventive Maintenance, and Alterations § 121.374 Continuous airworthiness maintenance program (CAMP) for two...

  10. 14 CFR 121.374 - Continuous airworthiness maintenance program (CAMP) for two-engine ETOPS.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Continuous airworthiness maintenance...: CERTIFICATION AND OPERATIONS OPERATING REQUIREMENTS: DOMESTIC, FLAG, AND SUPPLEMENTAL OPERATIONS Maintenance, Preventive Maintenance, and Alterations § 121.374 Continuous airworthiness maintenance program (CAMP) for two...

  11. Ground Software Maintenance Facility (GSMF) user's manual

    NASA Technical Reports Server (NTRS)

    Aquila, V.; Derrig, D.; Griffith, G.

    1986-01-01

    Instructions for the Ground Software Maintenance Facility (GSMF) system user is provided to operate the GSMF in all modes. The GSMF provides the resources for the Automatic Test Equipment (ATE) computer program maintenance (GCOS and GOAL). Applicable reference documents are listed. An operational overview and descriptions of the modes in terms of operator interface, options, equipment, material utilization, and operational procedures are contained. Test restart procedures are described. The GSMF documentation tree is presented including the user manual.

  12. Exception handling for sensor fusion

    NASA Astrophysics Data System (ADS)

    Chavez, G. T.; Murphy, Robin R.

    1993-08-01

    This paper presents a control scheme for handling sensing failures (sensor malfunctions, significant degradations in performance due to changes in the environment, and errant expectations) in sensor fusion for autonomous mobile robots. The advantages of the exception handling mechanism are that it emphasizes a fast response to sensing failures, is able to use only a partial causal model of sensing failure, and leads to a graceful degradation of sensing if the sensing failure cannot be compensated for. The exception handling mechanism consists of two modules: error classification and error recovery. The error classification module in the exception handler attempts to classify the type and source(s) of the error using a modified generate-and-test procedure. If the source of the error is isolated, the error recovery module examines its cache of recovery schemes, which either repair or replace the current sensing configuration. If the failure is due to an error in expectation or cannot be identified, the planner is alerted. Experiments using actual sensor data collected by the CSM Mobile Robotics/Machine Perception Laboratory's Denning mobile robot demonstrate the operation of the exception handling mechanism.

  13. 40 CFR 63.2164 - If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 13 2014-07-01 2014-07-01 false If I monitor brew ethanol, what are my... § 63.2164 If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...) of this section. (1) Calibrate the GC at least daily, by analyzing standard solutions of ethanol in...

  14. 40 CFR 63.2164 - If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 13 2013-07-01 2012-07-01 true If I monitor brew ethanol, what are my... § 63.2164 If I monitor brew ethanol, what are my monitoring installation, operation, and maintenance...) of this section. (1) Calibrate the GC at least daily, by analyzing standard solutions of ethanol in...

  15. The NUITM-KEMRI P3 Laboratory in Kenya: Establishment, Features, Operation and Maintenance

    PubMed Central

    Inoue, Shingo; Wandera, Ernest; Miringu, Gabriel; Bundi, Martin; Narita, Chika; Ashur, Salame; Kwallah, Allan; Galata, Amina; Abubakar, Mwajuma; Suka, Sora; Mohamed, Shah; Karama, Mohamed; Horio, Masahiro; Shimada, Masaaki; Ichinose, Yoshio

    2013-01-01

    A biocontainment facility is a core component in any research setting due to the services it renders towards comprehensive biosafety observance. The NUITM-KEMRI P3 facility was set up in 2007 and has been actively in use since 2010 by researchers from this and other institutions. A number of hazardous agents have been handled in the laboratory among them MDR-TB and yellow fever viruses. The laboratory has the general physical and operational features of a P3 laboratory in addition to a number of unique features, among them the water-air filtration system, the eco-mode operation feature and automation of the pressure system that make the facility more efficient. It is equipped with biosafety and emergency response equipments alongside common laboratory equipments, maintained regularly using daily, monthly and yearly routines. Security and safety is strictly observed within the facility, enhanced by restricted entry, strict documentation and use of safety symbols. Training is also engrained within the operation of the laboratory and is undertaken and evaluated annually. Though the laboratory is in the process of obtaining accreditation, it is fully certified courtesy of the manufactures’ and constructed within specified standards. PMID:23533023

  16. Lessons learned from a pilot project of an automatic vehicle location system in an urban winter maintenance operations setting.

    DOT National Transportation Integrated Search

    2002-01-01

    This report documents the lessons learned during the evolution of the Virginia Department of Transportation's pilot project to use an automatic vehicle location (AVL) system during winter maintenance operations in an urban setting. AVL is a technolog...

  17. Cellular Manufacturing System with Dynamic Lot Size Material Handling

    NASA Astrophysics Data System (ADS)

    Khannan, M. S. A.; Maruf, A.; Wangsaputra, R.; Sutrisno, S.; Wibawa, T.

    2016-02-01

    Material Handling take as important role in Cellular Manufacturing System (CMS) design. In several study at CMS design material handling was assumed per pieces or with constant lot size. In real industrial practice, lot size may change during rolling period to cope with demand changes. This study develops CMS Model with Dynamic Lot Size Material Handling. Integer Linear Programming is used to solve the problem. Objective function of this model is minimizing total expected cost consisting machinery depreciation cost, operating costs, inter-cell material handling cost, intra-cell material handling cost, machine relocation costs, setup costs, and production planning cost. This model determines optimum cell formation and optimum lot size. Numerical examples are elaborated in the paper to ilustrate the characterictic of the model.

  18. Gender difference in safe and unsafe practice of pesticide handling in tobacco farmers of malaysia.

    PubMed

    Bin Nordin, R; Araki, S; Sato, H; Yokoyama, K; Bin Wan Muda, W A; Win Kyi, D

    2001-01-01

    To identify gender difference in safe and unsafe practice of pesticide handling in tobacco farmers of Malaysia, we conducted a 20-item questionnaire interview on storage of pesticide (4 questions), mixing of pesticide (3 questions), use of personal protective equipment and clothing while spraying pesticide (7 questions), activities during and after spraying of pesticide (5 questions), and maintenance of pesticide sprayer (1 question) in 496 tobacco farmers (395 males and 101 females) in Bachok District, Kelantan, Malaysia. Duration of employment was significantly longer in females than those in males (p<0.001). In addition, proportion with no formal education in females was significantly higher than those in males (p<0.05). The following eight common factors were extracted from the 20 questionnaires by principal components factor analysis after varimax rotation in all farmers: (1) use of personal protective equipment, (2) unsafe work habit, (3) reading and following instructions on pesticide label, (4) security, storage and disposal of pesticide container, (5) safe work habit, (6) proper handling of pesticide and maintenance of pesticide sprayer, (7) use of personal protective clothing, and (8) safe handling of pesticide. Results of analysis of covariance for the eight factor scores of all male and female farmers, controlling for educational level and duration of employment, showed that: (1) factor scores for use of personal protective equipment (p<0.001), use of personal protective clothing (p<0.001) and safe work habit (p<0.001) in females were significantly lower than those in males; (2) conversely, factor scores for reading and following instruction on pesticide label (p<0.001) and proper handling of pesticide and maintenance of pesticide sprayer (p<0.01) in males were significantly lower than those in females; and (3) there were no significant differences in other three factor scores (p>0.05). We therefore conclude that: (1) for female tobacco farmers, choice

  19. Gender Difference in Safe and Unsafe Practice of Pesticide Handling in Tobacco Farmers of Malaysia

    PubMed Central

    BIN NORDIN, Rusli; ARAKI, Shunichi; SATO, Hajime; YOKOYAMA, Kazuhito; BIN WAN MUDA, Wan Abdul Manan; WIN KYI, Daw

    2001-01-01

    To identify gender difference in safe and unsafe practice of pesticide handling in tobacco farmers of Malaysia, we conducted a 20-item questionnaire interview on storage of pesticide (4 questions), mixing of pesticide (3 questions), use of personal protective equipment and clothing while spraying pesticide (7 questions), activities during and after spraying of pesticide (5 questions), and maintenance of pesticide sprayer (1 question) in 496 tobacco farmers (395 males and 101 females) in Bachok District, Kelantan, Malaysia. Duration of employment was significantly longer in females than those in males (p<0.001). In addition, proportion with no formal education in females was significantly higher than those in males (p<0.05). The following eight common factors were extracted from the 20 questionnaires by principal components factor analysis after varimax rotation in all farmers: (1) use of personal protective equipment, (2) unsafe work habit, (3) reading and following instructions on pesticide label, (4) security, storage and disposal of pesticide container, (5) safe work habit, (6) proper handling of pesticide and maintenance of pesticide sprayer, (7) use of personal protective clothing, and (8) safe handling of pesticide. Results of analysis of covariance for the eight factor scores of all male and female farmers, controlling for educational level and duration of employment, showed that: (1) factor scores for use of personal protective equipment (p<0.001), use of personal protective clothing (p<0.001) and safe work habit (p<0.001) in females were significantly lower than those in males; (2) conversely, factor scores for reading and following instruction on pesticide label (p<0.001) and proper handling of pesticide and maintenance of pesticide sprayer (p<0.01) in males were significantly lower than those in females; and (3) there were no significant differences in other three factor scores (p>0.05). We therefore conclude that: (1) for female tobacco farmers, choice

  20. Body temperature responses to handling stress in wintering Black-capped Chickadees (Poecile atricapillus L.).

    PubMed

    Lewden, Agnès; Nord, Andreas; Petit, Magali; Vézina, François

    2017-10-01

    Body temperature variation in response to acute stress is typically characterized by peripheral vasoconstriction and a concomitant increase in core body temperature (stress-induced hyperthermia). It is poorly understood how this response differs between species and within individuals of the same species, and how it is affected by the environment. We therefore investigated stress-induced body temperature changes in a non-model species, the Black-capped Chickadee, in two environmental conditions: outdoors in low ambient temperature (mean: -6.6°C), and indoors, in milder ambient temperature close to thermoneutrality (mean: 18.7°C). Our results show that the change in body temperature in response to the same handling stressor differs in these conditions. In cold environments, we noted a significant decrease in core body temperature (-2.9°C), whereas the response in mild indoor conditions was weak and non-significant (-0.6°C). Heat loss in outdoor birds was exacerbated when birds were handled for longer time. This may highlight the role of behavioral thermoregulation and heat substitution from activity to body temperature maintenance in harsh condition. Importantly, our work also indicates that changes in the physical properties of the bird during handling (conductive cooling from cold hands, decreased insulation from compression of plumage and prevention of ptiloerection) may have large consequences for thermoregulation. This might explain why females, the smaller sex, lost more heat than males in the experiment. Because physiological and physical changes during handling may carry over to affect predation risk and maintenance of energy balance during short winter days, we advice caution when designing experimental protocols entailing prolonged handling of small birds in cold conditions. Copyright © 2017 Elsevier Inc. All rights reserved.

  1. [Hygienic handling in cardiac surgery].

    PubMed

    Shimasaki, T; Masaoka, T; Hirooka, S; Abe, H; Watanabe, T; Washio, M

    1993-04-01

    Some points regarding the hygienic handling in cardiac surgery are mentioned. The sternal infection or mediastinitis is still one of the most important complications after cardiac operation especially when ITA is used for CABG. After we paid much attention to these points, the postoperative sternal infection has decreased obviously.

  2. Maintenance manager's manual for small transit agencies. Special report 1985-1986

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fowler, W.

    1988-03-01

    This publication contains information to assist operators of transit agencies providing public transportation in rural and smaller urban areas to better manage their vehicle maintenance programs. The report includes discussions of maintenance management, maintenance programs preventive maintenance, recordkeeping, selection of type of maintenance operation, in-house maintenance, and maintenance practices. Also included are appendixes giving supplementary information about tire loads; lubrication oil; mechanic hand tools; shop tools; mechanic aptitude tests; technical training resources; maintenance management training resources; and lists of manufacturers of air-conditioning systems, wheelchair lifts and wheelchair ramps.

  3. 41 CFR 102-85.175 - Are the standard level services for cleaning, mechanical operation, and maintenance identified in...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 41 Public Contracts and Property Management 3 2011-01-01 2011-01-01 false Are the standard level services for cleaning, mechanical operation, and maintenance identified in an OA? 102-85.175 Section 102-85.175 Public Contracts and Property Management Federal Property Management Regulations System (Continued...

  4. 25 CFR 502.22 - Construction and maintenance of the gaming facility, and the operation of that gaming is...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... the operation of that gaming is conducted in a manner which adequately protects the environment and... protects the environment and the public health and safety. Construction and maintenance of the gaming... environment and the public health and safety means a tribe has identified and enforces laws, resolutions...

  5. Manual handling of highway kerbs--focus group findings.

    PubMed

    Bust, P D; Gibb, A G F; Haslam, R A

    2005-07-01

    The manual handling of concrete highway kerbs remains commonplace in the construction industry despite obvious risks to operatives. This study was undertaken to find out why kerb installation still includes manual handling, to identify the alternatives that exist and to consider how the organisation of the work affects exposure to risk. Focus groups were held with industry professionals to discuss kerb design, installation and the training of operatives, with site visits and interviews undertaken to place the focus group findings in context. The focus group discussions highlighted manufacturer's "myopia", a lack of installation knowledge of designers and shortfalls in training for installation work. It was concluded that risks to the health of construction workers remain as they are not considered in the design of the product, design of the work or ameliorated by adequate risk assessment. Recommendations from the research are that a pro-active approach to health needs to be adopted by the manufacturers of heavy construction products. Designers of work requiring the use of heavy products need to have more experience of site operations, and education and training in manual handling is desirable at all levels in construction organisations.

  6. U.S.-MEXICO BORDER PROGRAM ARIZONA BORDER STUDY--STANDARD OPERATING PROCEDURE FOR OPERATION, CALIBRATION AND MAINTENANCE OF FIXED AND ADJUSTABLE VOLUME PIPETTE GUNS (BCO-L-9.0)

    EPA Science Inventory

    The purpose of this SOP is to describe the general procedures for the operation, calibration, and maintenance of fixed- and adjustable-volume pipette guns. This procedure was followed to ensure consistent data retrieval during the Arizona NHEXAS project and the Border study. Keyw...

  7. NHEXAS PHASE I ARIZONA STUDY--STANDARD OPERATING PROCEDURE FOR OPERATION, CALIBRATION AND MAINTENANCE OF THE PERKIN-ELMER ZEEMAN/5000 SYSTEM ATOMIC ABSORPTION SPECTROMETER (BCO-L-6.0)

    EPA Science Inventory

    The purpose of this SOP is to outline the start-up, calibration, operation, and maintenance procedures for the Perkin-Elmer 5000 atomic absorption spectrophotometer (PE 5000 AA), and the Perkin Elmer 5000 Zeeman graphite furnace atomic absorption spectrophotometer (PE 5000Z GFAA)...

  8. Integration of infrared thermography into various maintenance methodologies

    NASA Astrophysics Data System (ADS)

    Morgan, William T.

    1993-04-01

    Maintenance methodologies are in developmental stages throughout the world as global competitiveness drives all industries to improve operational efficiencies. Rapid progress in technical advancements has added an additional strain on maintenance organizations to progressively change. Accompanying needs for advanced training and documentation is the demand for utilization of various analytical instruments and quantitative methods. Infrared thermography is one of the primary elements of engineered approaches to maintenance. Current maintenance methodologies can be divided into six categories; Routine ('Breakdown'), Preventive, Predictive, Proactive, Reliability-Based, and Total Productive (TPM) maintenance. Each of these methodologies have distinctive approaches to achieving improved operational efficiencies. Popular though is that infrared thermography is a Predictive maintenance tool. While this is true, it is also true that it can be effectively integrated into each of the maintenance methodologies for achieving desired results. The six maintenance strategies will be defined. Infrared applications integrated into each will be composed in tabular form.

  9. Space station orbit maintenance

    NASA Technical Reports Server (NTRS)

    Kaplan, D. I.; Jones, R. M.

    1983-01-01

    The orbit maintenance problem is examined for two low-earth-orbiting space station concepts - the large, manned Space Operations Center (SOC) and the smaller, unmanned Science and Applications Space Platform (SASP). Atmospheric drag forces are calculated, and circular orbit altitudes are selected to assure a 90 day decay period in the event of catastrophic propulsion system failure. Several thrusting strategies for orbit maintenance are discussed. Various chemical and electric propulsion systems for orbit maintenance are compared on the basis of propellant resupply requirements, power requirements, Shuttle launch costs, and technology readiness.

  10. Maintenance-free operation of WDM quantum key distribution system through a field fiber over 30 days

    NASA Astrophysics Data System (ADS)

    Yoshino, Ken-ichiro; Ochi, Takao; Fujiwara, Mikio; Sasaki, Masahide; Tajima, Akio

    2013-12-01

    Maintenance-free wavelength-division-multiplexing quantum key distribution for 30 days was achieved through a 22-km field fiber. Using polarization-independent interferometers and stabilization techniques, we attained a quantum bit error rate as low as 1.70% and a key rate as high as 229.8 kbps, making the record of total secure key of 595.6 Gbits accumulated over an uninterrupted operation period.

  11. NASA Space Program experience in hydrogen transportation and handling

    NASA Technical Reports Server (NTRS)

    Bain, A. L.

    1976-01-01

    This paper portrays the experience gained in the transportation and handling of hydrogen in support of the Apollo launch site at Kennedy Space Center (KSC), Fla., one of NASA's prime hydrogen users in the Space Program. The objective of the paper is basically to reveal the types of systems involved in handling hydrogen, safety practices, operational techniques, other general experience information, and primarily to convey the routinism by which this potential fuel of the future has already been handled in significant quantities for a number of years.

  12. Supply Warehouse#3, SWMU 088 Operations, Maintenance, and Monitoring Report Kennedy Space Center, Florida

    NASA Technical Reports Server (NTRS)

    Murphy, Alex

    2016-01-01

    This document presents the findings, observations, and results associated with Operations, Maintenance, and Monitoring (OM&M) activities of Corrective Measures Implementation (CMI) activities conducted at Supply Warehouse #3 (SW3) located at John F. Kennedy Space Center (KSC), Florida from October 8, 2015, to September 12, 2016, and performance monitoring results for semi-annual sampling events conducted in March and September 2016. The primary objective of SW3 CMI is to actively decrease concentrations of trichloroethene (TCE) and vinyl chloride (VC) to less than Florida Department of Environmental Protection (FDEP) Natural Attenuation Default Concentrations (NADCs), and the secondary objective is to reduce TCE, cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE), 1,1-dichloroethene (11DCE), and VC concentrations to less than FDEP Groundwater Cleanup Target Levels (GCTLs). The SW3 facility has been designated Solid Waste Management Unit (SWMU) 088 under KSC's Resource Conservation and Recovery Act (RCRA) Corrective Action Program. Based on the results to date, the SW3 air sparging (AS) system is operating at or below the performance criteria as presented in the 2008 SW3 Corrective Measures Implementation (CMI) Work Plan and 2009 and 2012 CMI Work Plan Addenda. Since the start of AS system operations on December 19, 2012, through the September 2016 groundwater sampling event, TCE concentrations have decreased to less than the GCTL in all wells within the Active Remediation Zone (ARZ), and VC results remain less than NADC but greater than GCTL. Based on these results, team consensus was reached at the October 2016 KSC Remediation Team (KSCRT) meeting to continue AS system operations and semi-annual performance monitoring of volatile organic compounds in March 2017 at ten monitoring wells at select locations, and in September 2017 at four monitoring wells at select locations to reduce VC concentrations to below GCTL. Additionally, surface water samples

  13. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of...

  14. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of Continuous...

  15. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of...

  16. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of...

  17. 40 CFR Table 40 to Subpart Uuu of... - Requirements for Installation, Operation, and Maintenance of Continuous Opacity Monitoring...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Systems 40 Table 40 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 40 Table 40 to Subpart UUU of Part 63—Requirements for Installation, Operation, and Maintenance of Continuous...

  18. Apollo/Saturn C00.00.19.3 operations and maintenance. Cathodic protection of communication cables

    NASA Technical Reports Server (NTRS)

    1972-01-01

    Operating and maintenance instructions for cathodic protection of communication cables at the Cape Kennedy Launch Complex are presented. The system is designed to prevent or arrest corrosion of communication cables buried in soil or submerged in water by impressing sufficient direct current from the rectifier through the anodes to the cable. This process neutralizes or counteracts current flowing from the cable into the soil or water, thus preventing or arresting corrosion of the cable sheath material.

  19. Reaffirming Some Basic Principles in Purchasing and Maintenance.

    ERIC Educational Resources Information Center

    Throop, Harold L., Jr.

    1985-01-01

    Reaffirms necessary elements for the successful operation of college purchasing and maintenance programs (e.g., purchasing calendar, bidding procedures, vendor selection, contracting services, budgeting for maintenance, and workforce analysis). Discusses ways some colleges are saving on operating costs (e.g., solar energy, energy management,…

  20. 49 CFR 193.2605 - Maintenance procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Maintenance § 193.2605 Maintenance procedures. (a) Each operator shall determine...

  1. 49 CFR 193.2605 - Maintenance procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Maintenance § 193.2605 Maintenance procedures. (a) Each operator shall determine...

  2. Effects of maintenance operations on track buckling potential

    DOT National Transportation Integrated Search

    2003-05-04

    This paper presents the results of buckling analyses based on data from recent tests determining the influence of track maintenance and consolidation on track lateral resistance. The buckling analyses were performed using the USDOT/Volpe "CWR-SAFE" m...

  3. 49 CFR 214.341 - Roadway maintenance machines.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Roadway maintenance machines. 214.341 Section 214... Roadway maintenance machines. (a) Each employer shall include in its on-track safety program specific provisions for the safety of roadway workers who operate or work near roadway maintenance machines. Those...

  4. 40 CFR 63.105 - Maintenance wastewater requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 10 2012-07-01 2012-07-01 false Maintenance wastewater requirements... Manufacturing Industry § 63.105 Maintenance wastewater requirements. (a) Each owner or operator of a source... for maintenance wastewaters containing those organic HAP's listed in table 9 of subpart G of this part...

  5. Maintenance problems associated with the operation of the F402 /Pegasus/ engine in the AV-8A /Harrier/ aircraft

    NASA Technical Reports Server (NTRS)

    Stanley, C. W.; Hood, W. E.

    1981-01-01

    The U.S. Marine Corp (USMC) has been operating the only V/STOL attack aircraft in the western world since 1971. Some of the maintenance problems experienced are related to the unique V/STOL design criteria of the Pegasus engine. However, the major part of the required maintenance effort is found to involve the more conventional engine problems. A description of the aircraft engine is provided and the problems resulting from V/STOL design demands are examined. Attention is given to the fuel system control, the engine air bleed, foreign object damage to the hp compressor, and the engine exhaust system.

  6. How to develop a Standard Operating Procedure for sorting unfixed cells

    PubMed Central

    Schmid, Ingrid

    2012-01-01

    Written Standard Operating Procedures (SOPs) are an important tool to assure that recurring tasks in a laboratory are performed in a consistent manner. When the procedure covered in the SOP involves a high-risk activity such as sorting unfixed cells using a jet-in-air sorter, safety elements are critical components of the document. The details on sort sample handling, sorter set-up, validation, operation, troubleshooting, and maintenance, personal protective equipment (PPE), and operator training, outlined in the SOP are to be based on careful risk assessment of the procedure. This review provides background information on the hazards associated with sorting of unfixed cells and the process used to arrive at the appropriate combination of facility design, instrument placement, safety equipment, and practices to be followed. PMID:22381383

  7. How to develop a standard operating procedure for sorting unfixed cells.

    PubMed

    Schmid, Ingrid

    2012-07-01

    Written standard operating procedures (SOPs) are an important tool to assure that recurring tasks in a laboratory are performed in a consistent manner. When the procedure covered in the SOP involves a high-risk activity such as sorting unfixed cells using a jet-in-air sorter, safety elements are critical components of the document. The details on sort sample handling, sorter set-up, validation, operation, troubleshooting, and maintenance, personal protective equipment (PPE), and operator training, outlined in the SOP are to be based on careful risk assessment of the procedure. This review provides background information on the hazards associated with sorting of unfixed cells and the process used to arrive at the appropriate combination of facility design, instrument placement, safety equipment, and practices to be followed. Copyright © 2012 Elsevier Inc. All rights reserved.

  8. 14 CFR 171.31 - Maintenance and operations requirements.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... the Federal Communications Commission's licensing requirements and show that he has the special knowledge and skills needed to maintain the facility including proficiency in maintenance procedures and the... of servicing. (8) Air-ground communications, if provided, expressly written or incorporating...

  9. 14 CFR 171.31 - Maintenance and operations requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... the Federal Communications Commission's licensing requirements and show that he has the special knowledge and skills needed to maintain the facility including proficiency in maintenance procedures and the... of servicing. (8) Air-ground communications, if provided, expressly written or incorporating...

  10. 14 CFR 171.31 - Maintenance and operations requirements.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... the Federal Communications Commission's licensing requirements and show that he has the special knowledge and skills needed to maintain the facility including proficiency in maintenance procedures and the... of servicing. (8) Air-ground communications, if provided, expressly written or incorporating...

  11. 14 CFR 171.31 - Maintenance and operations requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the Federal Communications Commission's licensing requirements and show that he has the special knowledge and skills needed to maintain the facility including proficiency in maintenance procedures and the... of servicing. (8) Air-ground communications, if provided, expressly written or incorporating...

  12. 14 CFR 171.51 - Maintenance and operations requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... meet at least the Federal Communications Commission's licensing requirements and show that he has the special knowledge and skills needed to maintain the facility including proficiency in maintenance... servicing. (8) Air-ground communications, if provided, expressly written or incorporating appropriate...

  13. 14 CFR 171.51 - Maintenance and operations requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... meet at least the Federal Communications Commission's licensing requirements and show that he has the special knowledge and skills needed to maintain the facility including proficiency in maintenance... servicing. (8) Air-ground communications, if provided, expressly written or incorporating appropriate...

  14. 14 CFR 171.31 - Maintenance and operations requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the Federal Communications Commission's licensing requirements and show that he has the special knowledge and skills needed to maintain the facility including proficiency in maintenance procedures and the... of servicing. (8) Air-ground communications, if provided, expressly written or incorporating...

  15. 47 CFR 80.96 - Maintenance tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Maintenance tests. 80.96 Section 80.96... tests. Stations are authorized to engage in test transmissions necessary for maintenance of the station. Test transmissions must conform to appropriate test operating procedures. ...

  16. Identification of the human factors contributing to maintenance failures in a petroleum operation.

    PubMed

    Antonovsky, Ari; Pollock, Clare; Straker, Leon

    2014-03-01

    This research aimed to identify the most frequently occurring human factors contributing to maintenance-related failures within a petroleum industry organization. Commonality between failures will assist in understanding reliability in maintenance processes, thereby preventing accidents in high-hazard domains. Methods exist for understanding the human factors contributing to accidents. Their application in a maintenance context mainly has been advanced in aviation and nuclear power. Maintenance in the petroleum industry provides a different context for investigating the role that human factors play in influencing outcomes. It is therefore worth investigating the contributing human factors to improve our understanding of both human factors in reliability and the factors specific to this domain. Detailed analyses were conducted of maintenance-related failures (N = 38) in a petroleum company using structured interviews with maintenance technicians. The interview structure was based on the Human Factor Investigation Tool (HFIT), which in turn was based on Rasmussen's model of human malfunction. A mean of 9.5 factors per incident was identified across the cases investigated.The three most frequent human factors contributing to the maintenance failures were found to be assumption (79% of cases), design and maintenance (71%), and communication (66%). HFIT proved to be a useful instrument for identifying the pattern of human factors that recurred most frequently in maintenance-related failures. The high frequency of failures attributed to assumptions and communication demonstrated the importance of problem-solving abilities and organizational communication in a domain where maintenance personnel have a high degree of autonomy and a wide geographical distribution.

  17. 49 CFR 230.66 - Design, construction, and maintenance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION STEAM LOCOMOTIVE INSPECTION AND MAINTENANCE STANDARDS Steam Locomotives and Tenders § 230.66 Design, construction, and maintenance. The steam locomotive owner and operator are responsible for the general design, construction and maintenance of the steam locomotives and...

  18. 14 CFR 91.1111 - Maintenance training.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Maintenance training. 91.1111 Section 91... Operations Program Management § 91.1111 Maintenance training. The program manager must ensure that all... annual recurrent training and are competent to perform those duties. ...

  19. 14 CFR 91.1111 - Maintenance training.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Maintenance training. 91.1111 Section 91... Operations Program Management § 91.1111 Maintenance training. The program manager must ensure that all... annual recurrent training and are competent to perform those duties. ...

  20. 40 CFR 63.748 - Standards: Handling and storage of waste.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...: Handling and storage of waste. Except as provided in § 63.741(e), the owner or operator of each facility subject to this subpart that produces a waste that contains HAP shall conduct the handling and transfer of... waste. 63.748 Section 63.748 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR...