Sample records for high priority projects

  1. 25 CFR Appendix A to Subpart C - IRR High Priority Project Scoring Matrix

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false IRR High Priority Project Scoring Matrix A Appendix A to...—IRR High Priority Project Scoring Matrix Score 10 5 3 1 0 Accident and fatality rate for candidate...,000 or less 250,001-500,000 500,001-750,000 Over 750,000. Geographic isolation No external access to...

  2. 25 CFR Appendix A to Subpart C - IRR High Priority Project Scoring Matrix

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false IRR High Priority Project Scoring Matrix A Appendix A to...—IRR High Priority Project Scoring Matrix Score 10 5 3 1 0 Accident and fatality rate for candidate...,000 or less 250,001-500,000 500,001-750,000 Over 750,000. Geographic isolation No external access to...

  3. 25 CFR Appendix A to Subpart C - IRR High Priority Project Scoring Matrix

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false IRR High Priority Project Scoring Matrix A Appendix A to...—IRR High Priority Project Scoring Matrix Score 10 5 3 1 0 Accident and fatality rate for candidate...,000 or less 250,001-500,000 500,001-750,000 Over 750,000. Geographic isolation No external access to...

  4. 25 CFR Appendix A to Subpart C - IRR High Priority Project Scoring Matrix

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true IRR High Priority Project Scoring Matrix A Appendix A to...—IRR High Priority Project Scoring Matrix Score 10 5 3 1 0 Accident and fatality rate for candidate...,000 or less 250,001-500,000 500,001-750,000 Over 750,000. Geographic isolation No external access to...

  5. 25 CFR 170.205 - What is an IRR High Priority Project (IRRHPP)?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESERVATION ROADS PROGRAM Indian Reservation Roads Program Funding Irr High Priority Project (irrhpp) § 170... applications. (c) IRRHPP funds cannot be used for transportation planning, research, routine maintenance...

  6. 25 CFR Appendix A to Subpart C - IRR High Priority Project Scoring Matrix

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...—IRR High Priority Project Scoring Matrix Score 10 5 3 1 0 Accident and fatality rate for candidate route 1 Severe X Moderate Minimal No accidents. Years since last IRR construction project completed... elements Addresses 1 element. 1 National Highway Traffic Safety Board standards. 2 Total funds requested...

  7. Job Priorities on Peregrine | High-Performance Computing | NREL

    Science.gov Websites

    allocation when run with qos=high. Requesting a Node Reservation If you are doing work that requires real scheduler more efficiently plan resources for larger jobs. When projects reach their allocation limit, jobs associated with those projects will run at very low priority, which will ensure that these jobs run only when

  8. Priority Questions and Horizon Scanning for Conservation: A Comparative Study

    PubMed Central

    Kark, Salit; Sutherland, William J.; Shanas, Uri; Klass, Keren; Achisar, Hila; Dayan, Tamar; Gavrieli, Yael; Justo-Hanani, Ronit; Mandelik, Yael; Orion, Nir; Pargament, David; Portman, Michelle; Reisman-Berman, Orna; Safriel, Uriel N.; Schaffer, Gad; Steiner, Noa; Tauber, Israel; Levin, Noam

    2016-01-01

    Several projects aimed at identifying priority issues for conservation with high relevance to policy have recently been completed in several countries. Two major types of projects have been undertaken, aimed at identifying (i) policy-relevant questions most imperative to conservation and (ii) horizon scanning topics, defined as emerging issues that are expected to have substantial implications for biodiversity conservation and policy in the future. Here, we provide the first overview of the outcomes of biodiversity and conservation-oriented projects recently completed around the world using this framework. We also include the results of the first questions and horizon scanning project completed for a Mediterranean country. Overall, the outcomes of the different projects undertaken (at the global scale, in the UK, US, Canada, Switzerland and in Israel) were strongly correlated in terms of the proportion of questions and/or horizon scanning topics selected when comparing different topic areas. However, some major differences were found across regions. There was large variation among regions in the percentage of proactive (i.e. action and response oriented) versus descriptive (non-response oriented) priority questions and in the emphasis given to socio-political issues. Substantial differences were also found when comparing outcomes of priority questions versus horizon scanning projects undertaken for the same region. For example, issues related to climate change, human demography and marine ecosystems received higher priority as horizon scanning topics, while ecosystem services were more emphasized as current priority questions. We suggest that future initiatives aimed at identifying priority conservation questions and horizon scanning topics should allow simultaneous identification of both current and future priority issues, as presented here for the first time. We propose that further emphasis on social-political issues should be explicitly integrated into future related projects. PMID:26815653

  9. The Next Linear Collider Program-News

    Science.gov Websites

    The Next Linear Collider at SLAC Navbar The Next Linear Collider In The Press The Secretary of Linear Collider is a high-priority goal of this plan. http://www.sc.doe.gov/Sub/Facilities_for_future/20 -term projects in conceputal stages (the Linear Collider is the highest priority project in this

  10. Priority Treatment for High Occupancy Vehicles in the United States: A Review of Recent and Forthcoming Projects

    DOT National Transportation Integrated Search

    1978-08-01

    The purposes of the report are to: (1) describe recent High Occupancy Vehicle (HOV) preferential projects in the United States; (2) summarize the results of these projects and draw implications; and (3) outline projects which are to be implemented ov...

  11. 7 CFR 1778.7 - Project priority.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Project priority. 1778.7 Section 1778.7 Agriculture... (CONTINUED) EMERGENCY AND IMMINENT COMMUNITY WATER ASSISTANCE GRANTS § 1778.7 Project priority. Paragraph (d... to determine the proposed project's priority for available funds. (b) State Office review. All...

  12. 7 CFR 1778.7 - Project priority.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 12 2014-01-01 2013-01-01 true Project priority. 1778.7 Section 1778.7 Agriculture... (CONTINUED) EMERGENCY AND IMMINENT COMMUNITY WATER ASSISTANCE GRANTS § 1778.7 Project priority. Paragraph (d... to determine the proposed project's priority for available funds. (b) State Office review. All...

  13. 7 CFR 1778.7 - Project priority.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 12 2012-01-01 2012-01-01 false Project priority. 1778.7 Section 1778.7 Agriculture... (CONTINUED) EMERGENCY AND IMMINENT COMMUNITY WATER ASSISTANCE GRANTS § 1778.7 Project priority. Paragraph (d... to determine the proposed project's priority for available funds. (b) State Office review. All...

  14. 7 CFR 1777.13 - Project priority.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Project priority. 1777.13 Section 1777.13 Agriculture... (CONTINUED) SECTION 306C WWD LOANS AND GRANTS § 1777.13 Project priority. Paragraphs (a) through (d) of this... applicant eligibility and the proposed project's priority for available funds. Applicants determined...

  15. 7 CFR 1777.13 - Project priority.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 12 2012-01-01 2012-01-01 false Project priority. 1777.13 Section 1777.13 Agriculture... (CONTINUED) SECTION 306C WWD LOANS AND GRANTS § 1777.13 Project priority. Paragraphs (a) through (d) of this... applicant eligibility and the proposed project's priority for available funds. Applicants determined...

  16. Restoring High Priority Habitats for Birds: Aspen and Pine in the Interior West

    Treesearch

    Rex Sallabanks; Nils D. Christoffersen; Whitney W. Weatherford; Ralph Anderson

    2005-01-01

    This paper describes a long-term habitat restoration project in the Blue Mountains ecoregion, northeast Oregon, that we initiated in May 2000. We focused our restoration activities on two habitats previously identified as being high priority for birds: quaking aspen (Populus tremuloides) and ponderosa pine (Pinus ponderosa). In...

  17. 44 CFR 209.7 - Priorities for project selection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... appropriate means may identify buyout and elevation projects. (b) States will set priorities in their State... 44 Emergency Management and Assistance 1 2010-10-01 2010-10-01 false Priorities for project... ASSISTANCE § 209.7 Priorities for project selection. (a) It is the State's responsibility to identify and...

  18. 7 CFR 1777.13 - Project priority.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 12 2014-01-01 2013-01-01 true Project priority. 1777.13 Section 1777.13 Agriculture... (CONTINUED) SECTION 306C WWD LOANS AND GRANTS § 1777.13 Project priority. Paragraphs (a) through (d) of this... eligibility and the proposed project's priority for available funds. Applicants determined ineligible will be...

  19. Its Seat Is in the Heart.

    ERIC Educational Resources Information Center

    Mesplay, Gail

    2001-01-01

    Presents several practical ideas for making peace a priority within the classroom. Shares stories of a high school and an elementary school where peace projects have flourished. The elementary project involved planting a tree germinated from a Japanese tree that had survived the atomic bomb. The high school project involved apprenticing teenagers…

  20. Iowa High School Industrial Arts Curriculum Project. Report on Year One of Phase II.

    ERIC Educational Resources Information Center

    Des Moines Public Schools, IA.

    Phase II of the Iowa High School Industrial Arts project sought to revise industrial arts content to include the infusion of new technologies, structured mathematics and science content, and a less project-oriented approach to teaching. The project identified a philosophical basis and a content structure; set priorities for development and…

  1. 76 FR 38134 - Final Priorities; Disability and Rehabilitation Research Projects and Centers Program-Disability...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-29

    ...-identified research designs to generate reliable and valid findings. Changes: None. Final Priorities Priority... DEPARTMENT OF EDUCATION Final Priorities; Disability and Rehabilitation Research Projects and Centers Program--Disability Rehabilitation Research Projects, etc. AGENCY: Office of Special Education and...

  2. A Study on Project Priority Evaluation Method on Road Slope Disaster Prevention Management

    NASA Astrophysics Data System (ADS)

    Sekiguchi, Nobuyasu; Ohtsu, Hiroyasu; Izu, Ryuutarou

    To improve the safety and security of driving while coping with today's stagnant economy and frequent natural disasters, road slopes should be appropriately managed. To achieve the goals, road managers should establish project priority evaluation methods for each stage of road slope management by clarifying social losses that would result by drops in service levels. It is important that road managers evaluate a project priority properly to manage the road slope effectively. From this viewpoint, this study proposed "project priority evaluation methods" in road slope disaster prevention, which use available slope information at each stage of road slope management under limited funds. In addition, this study investigated the effect of managing it from the high slope of the priority by evaluating a risk of slope failure. In terms of the amount of available information, staged information provision is needed ranging from macroscopic studies, which involves evaluation of the entire route at each stage of decision making, to semi- and microscopic investigations for evaluating slopes, and microscopic investigations for evaluating individual slopes. With limited funds, additional detailed surveys are difficult to perform. It is effective to use the slope risk assessment system, which was constructed to complement detailed data, to extract sites to perform precise investigations.

  3. 40 CFR 35.2015 - State priority system and project priority list.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... achieve optimum water quality management consistent with the goals and requirements of the Act. All..., needs and priorities set forth in areawide water quality management plans, and any other factors... priority to projects in priority water quality areas. The priority system may also include the...

  4. 15 CFR 2301.4 - Types of projects and broadcast priorities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Broadcast Priorities are set forth in order of priority for funding. (1) Priority 1—Provision of Public... priorities. 2301.4 Section 2301.4 Commerce and Foreign Trade Regulations Relating to Telecommunications and... TELECOMMUNICATIONS FACILITIES PROGRAM Application Requirements § 2301.4 Types of projects and broadcast priorities...

  5. Advanced In-Space Propulsion: "Exploring the Solar System"

    NASA Technical Reports Server (NTRS)

    Johnson, Les

    2003-01-01

    This viewgraph presentation reviews a number of advanced propulsion technologies for interplanetary spacecraft. The objective of the In Space Propulsion Technology Projects Office is to develop in-space propulsion technologies that can enable and/or benefit near and mid-term NASA science missions by significantly reducing cost, mass, and/or travel times. The technologies profiled are divided into several categories: High Priority (aerocapture, next generation ion propulsion, solar sails); Medium Priority (advanced chemical propulsion, solar electric propulsion, Hall thrusters); Low Priority (solar thermal propulsion); and High Payoff/High Risk (1 g/sq m solar sails, momentum exchange tethers, and plasma sails).

  6. [National and regional prioritisation in Swedish health care: experiences from cardiology].

    PubMed

    Carlsson, Jörg

    2012-01-01

    Prioritisation of medical services in Sweden takes place on two different levels. On the national level, the Swedish priority guidelines ascribe priority values ranging from 1 (high priority) to 10 (low priority) to measures (in terms of condition-treatment pairs) of prevention, diagnosis, treatment and rehabilitation of cardiovascular diseases. In addition, this list contains interventions that should be avoided and those that should only be provided as part of clinical research projects. The government then commissions a multi-professional team under the supervision of the National Board of Health and Welfare "Socialstyelsen" with the development of corresponding guidelines. In addition to the scientific evidence, the priority lists incorporate ethical and economical aspects and are based on the so-called ethics platform consisting of human dignity, needs, solidarity and cost-effectiveness. At the other level of prioritisation there are regional projects aiming at the in- and exclusion of medical measures. The Swedish prioritisation process will be described using the example of priority lists in cardiology. (As supplied by publisher). Copyright © 2012. Published by Elsevier GmbH.

  7. 34 CFR 263.21 - What priority is given to certain projects and applicants?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 1 2013-07-01 2013-07-01 false What priority is given to certain projects and... projects and applicants? (a) The Secretary awards a total of 5 competitive preference priority points to an... notice published in the Federal Register. (1) School readiness projects that provide age appropriate...

  8. 34 CFR 263.21 - What priority is given to certain projects and applicants?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 1 2011-07-01 2011-07-01 false What priority is given to certain projects and... projects and applicants? (a) The Secretary awards a total of 5 competitive preference priority points to an... notice published in the Federal Register. (1) School readiness projects that provide age appropriate...

  9. 76 FR 17396 - Proposed Priorities: Disability and Rehabilitation Research Projects and Centers Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-29

    ...-science conference on its designated priority research area in the fourth year of the project period, and... Rehabilitation Research Projects and Centers Program AGENCY: Office of Special Education and Rehabilitative... and Rehabilitative Services proposes two priorities for the Disability and Rehabilitation Research...

  10. 76 FR 793 - Multistate Conservation Grant Program; Priority List for Conservation Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-06

    ...; 91400-9410-0000-7B] Multistate Conservation Grant Program; Priority List for Conservation Projects... 2011 priority list of wildlife and sport fish conservation projects from the Association of Fish and Wildlife Agencies (AFWA). As required by the Wildlife and Sport Fish Restoration Programs Improvement Act...

  11. Placing and preserving priorities: projects, productivity, progress and people

    PubMed Central

    Babiak, John

    1998-01-01

    High throughput screening (HTS) involves using automated equipment to test a large number of samples against a defined molecular target to identify a reasonable number of active molecules in a timely fashion. Major factors which can influence priorities for the limited resources of the HTS group are projects, productivity, progress and people. The challenge to the HTS group is to provide excellent and timely screening services, but still devote efforts to new technologies and personnel development. This article explains why these factors are so important. PMID:18924829

  12. 76 FR 1427 - Lock+ Hydro Friends Fund XLVIII; FFP Missouri 15, LLC Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13809-000; Project No. 13814-000] Lock+ Hydro Friends Fund XLVIII; FFP Missouri 15, LLC Notice Announcing Filing Priority for... order of priority is as follows: 1. Lock+ Hydro Friends Fund XLVIII........ Project No. 13809-000...

  13. 78 FR 25093 - Multistate Conservation Grant Program; Priority List and Approval for Conservation Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-29

    ... Fish Restoration Act (16 U.S.C. 777 et seq.) and established the Multistate Conservation Grant Program...-9410-0000] Multistate Conservation Grant Program; Priority List and Approval for Conservation Projects... year 2013 priority list of wildlife and sport fish conservation projects from the Association of Fish...

  14. Setting and meeting priorities in Indigenous health research in Australia and its application in the Cooperative Research Centre for Aboriginal health.

    PubMed

    Monk, Johanna M; Rowley, Kevin G; Anderson, Ian Ps

    2009-11-20

    Priority setting is about making decisions. Key issues faced during priority setting processes include identifying who makes these decisions, who sets the criteria, and who benefits. The paper reviews the literature and history around priority setting in research, particularly in Aboriginal health research. We explore these issues through a case study of the Cooperative Research Centre for Aboriginal Health (CRCAH)'s experience in setting and meeting priorities.Historically, researchers have made decisions about what research gets done. Pressures of growing competition for research funds and an increased public interest in research have led to demands that appropriate consultation with stakeholders is conducted and that research is of benefit to the wider society. Within Australian Aboriginal communities, these demands extend to Aboriginal control of research to ensure that Aboriginal priorities are met.In response to these demands, research priorities are usually agreed in consultation with stakeholders at an institutional level and researchers are asked to develop relevant proposals at a project level. The CRCAH's experience in funding rounds was that scientific merit was given more weight than stakeholders' priorities and did not necessarily result in research that met these priorities. After reviewing these processes in 2004, the CRCAH identified a new facilitated development approach. In this revised approach, the setting of institutional priorities is integrated with the development of projects in a way that ensures the research reflects stakeholder priorities.This process puts emphasis on identifying projects that reflect priorities prior to developing the quality of the research, rather than assessing the relevance to priorities and quality concurrently. Part of the CRCAH approach is the employment of Program Managers who ensure that stakeholder priorities are met in the development of research projects. This has enabled researchers and stakeholders to come together to collaboratively develop priority-driven research. Involvement by both groups in project development has been found to be essential in making decisions that will lead to robust and useful research.

  15. Networking Activities at the Library of Congress.

    ERIC Educational Resources Information Center

    Maruyama, Lenore S.; Avram, Henriette D.

    1979-01-01

    Examines the background studies and high-priority projects which will lay the groundwork for the library bibliographic component of a National Library and Information Service Network and reviews the progress and problems of the national network as evidenced by current cooperative projects. (CWM)

  16. 76 FR 4648 - Lock+ Hydro Friends Fund XLIX; FFP Missouri 14, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-26

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13808-000; Project No. 13813-000] Lock+ Hydro Friends Fund XLIX; FFP Missouri 14, LLC; Notice Announcing Filing Priority for... order of priority is as follows: 1. Lock+ Hydro Friends Fund XLIX: Project No. 13808-000. 2. FFP...

  17. International Organization for Migration: experience on the need for medical evacuation of refugees during the Kosovo crisis in 1999.

    PubMed

    Szilard, Istvan; Cserti, Arpad; Hoxha, Ruhija; Gorbacheva, Olga; O'Rourke, Thomas

    2002-04-01

    The International Organization for Migration (IOM) developed and implemented a three-month project entitled Priority Medical Screening of Kosovar Refugees in Macedonia, within the Humanitarian Evacuation Program (HEP) for Kosovar refugees from FR Yugoslavia, which was adopted in May 1999. The project was based on an agreement with the office of United Nations High Commission for Refugees (UNHCR) and comprised the entry of registration data of refugees with medical condition (Priority Medical Database), and classification (Priority Medical Screening) and medical evacuation of refugees (Priority Medical Evacuation) in Macedonia. To realize the Priority Medical Screening project plan, IOM developed and set up a Medical Database linked to IOM/UNHCR HEP database, recruited and trained a four-member data entry team, worked out and set up a referral system for medical cases from the refugee camps, and established and staffed medical contact office for refugees in Skopje and Tetovo. Furthermore, it organized and staffed a mobile medical screening team, developed and implemented the system and criteria for the classification of referred medical cases, continuously registered and classified the incoming medical reports, contacted regularly the national delegates and referred to them the medically prioritized cases asking for acceptance and evacuation, and co-operated and continuously exchanged the information with UNHCR Medical Co-ordination and HEP team. Within the timeframe of the project, 1,032 medical cases were successfully evacuated for medical treatment to 25 host countries throughout the world. IOM found that those refugees suffering from health problems, who at the time of the termination of the program were still in Macedonia and had not been assisted by the project, were not likely to have been priority one cases, whose health problems could be solved only in a third country. The majority of these vulnerable people needed social rather than medical care and assistance a challenge that international aid agencies needed to address in Macedonia and will need to address elsewhere.

  18. 77 FR 25715 - Mississippi 8 Hydro, LLC; FFP Project 98, LLC, ; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No., 13010-002; Project No., 14272-000] Mississippi 8 Hydro, LLC; FFP Project 98, LLC, ; Notice Announcing Filing Priority for.... Mississippi 8 Hydro, LLC--Project No. 13010-002. 2. FFP Project 98, LLC--Project No. 14272-000. Dated: April...

  19. 77 FR 12281 - Lock+ Hydro Friends Fund XLIII; FFP Project 53, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14181-000; Project No. 14195-000] Lock+ Hydro Friends Fund XLIII; FFP Project 53, LLC; Notice Announcing Filing Priority for... follows: 1. Lock+ Hydro Friends Fund XLIII, Project No. 14181-000. 2. FFP Project 53, LLC, Project No...

  20. 77 FR 12280 - Lock+ Hydro Friends Fund XLI; FFP Project 54, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14182-000; Project No. 14192-000] Lock+ Hydro Friends Fund XLI; FFP Project 54, LLC; Notice Announcing Filing Priority for... follows: 1. FFP Project 54, LLC, Project No. 14192-000. 2. Lock+ Hydro Friends Fund XLI, Project No. 14182...

  1. 77 FR 12280 - Lock+ Hydro Friends Fund XXXV; FFP Project 57, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14186-000; Project No. 14197-000] Lock+ Hydro Friends Fund XXXV; FFP Project 57, LLC;Notice Announcing Filing Priority for... follows: 1. Lock+ Hydro Friends Fund XXXV, Project No. 14186-000. 2. FFP Project 57, LLC, Project No...

  2. 77 FR 12279 - Lock+ Hydro Friends Fund XXXVIII; FFP Project 1, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14184-000; Project No. 14191-000] Lock+ Hydro Friends Fund XXXVIII; FFP Project 1, LLC; Notice Announcing Filing Priority for... follows: 1. Lock+ Hydro Friends Fund XXXVIII, Project No. 14184-000. 2. FFP Project 1, LLC, Project No...

  3. Subsonic Aircraft Safety Icing Study

    NASA Technical Reports Server (NTRS)

    Jones, Sharon Monica; Reveley, Mary S.; Evans, Joni K.; Barrientos, Francesca A.

    2008-01-01

    NASA's Integrated Resilient Aircraft Control (IRAC) Project is one of four projects within the agency s Aviation Safety Program (AvSafe) in the Aeronautics Research Mission Directorate (ARMD). The IRAC Project, which was redesigned in the first half of 2007, conducts research to advance the state of the art in aircraft control design tools and techniques. A "Key Decision Point" was established for fiscal year 2007 with the following expected outcomes: document the most currently available statistical/prognostic data associated with icing for subsonic transport, summarize reports by subject matter experts in icing research on current knowledge of icing effects on control parameters and establish future requirements for icing research for subsonic transports including the appropriate alignment. This study contains: (1) statistical analyses of accident and incident data conducted by NASA researchers for this "Key Decision Point", (2) an examination of icing in other recent statistically based studies, (3) a summary of aviation safety priority lists that have been developed by various subject-matter experts, including the significance of aircraft icing research in these lists and (4) suggested future requirements for NASA icing research. The review of several studies by subject-matter experts was summarized into four high-priority icing research areas. Based on the Integrated Resilient Aircraft Control (IRAC) Project goals and objectives, the IRAC project was encouraged to conduct work in all of the high-priority icing research areas that were identified, with the exception of the developing of methods to sense and document actual icing conditions.

  4. PISA and Global Educational Governance--A Critique of the Project, Its Uses and Implications

    ERIC Educational Resources Information Center

    Sjøberg, Svein

    2015-01-01

    The PISA project has steadily increased its influence on the educational discourse and educational policies in the now 70 participating countries. The educational debate has become global, and the race to improve PISA-rankings has become high priority in many countries. For governments the PISA-test is a high-stake test. Governments are blamed for…

  5. 78 FR 53452 - Notice Announcing Filing Priority for Preliminary Permit Applications

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice Announcing Filing Priority for Preliminary Permit Applications Lock+ Hydro Friends Fund XXX, LLC.. Project No. 13625-003 FFP Project 121, LLC.... FFP Project 121, LLC Project No. 14504-000 2. Lock+ Hydro Friends Fund XXX, LLC Project No. 13625-003...

  6. 7 CFR 1777.13 - Project priority.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., etc. (d) Selection priorities. The priorities described below will be used to rate preapplications and... may assign up to 15 points for items such as natural disaster, to improve compatibility/coordination between the Agency's and other agencies' selection systems, to assist those projects that are the most...

  7. Effective stakeholder participation in setting research priorities using a Global Evidence Mapping approach.

    PubMed

    Clavisi, Ornella; Bragge, Peter; Tavender, Emma; Turner, Tari; Gruen, Russell L

    2013-05-01

    We present a multistep process for identifying priority research areas in rehabilitation and long-term care of traumatic brain-injured (TBI) patients. In particular, we aimed to (1) identify which stakeholders should be involved; (2) identify what methods are appropriate; (3) examine different criteria for the generation of research priority areas; and (4) test the feasibility of linkage and exchange among researchers, decision makers, and other potential users of the research. Potential research questions were identified and developed using an initial scoping meeting and preliminary literature search, followed by a facilitated mapping workshop and an online survey. Identified research questions were then prioritized against specific criteria (clinical importance, novelty, and controversy). Existing evidence was then mapped to the high-priority questions using usual processes for search, screening, and selection. A broad range of stakeholders were then brought together at a forum to identify priority research themes for future research investment. Using clinical and research leaders, smaller targeted planning workshops prioritized specific research projects for each of the identified themes. Twenty-six specific questions about TBI rehabilitation were generated, 14 of which were high priority. No one method identified all high-priority questions. Methods that relied solely on the views of clinicians and researchers identified fewer high-priority questions compared with methods that used broader stakeholder engagement. Evidence maps of these high-priority questions yielded a number of evidence gaps. Priority questions and evidence maps were then used to inform a research forum, which identified 12 priority themes for future research. Our research demonstrates the value of a multistep and multimethod process involving many different types of stakeholders for prioritizing research to improve the rehabilitation outcomes of people who have suffered TBI. Enhancing stakeholder representation can be augmented using a combination of methods and a process of linkage and exchange. This process can inform decisions about prioritization of research areas. Copyright © 2013 Elsevier Inc. All rights reserved.

  8. 77 FR 14775 - Lock+ Hydro Friends Fund XLV, FFP Project 2, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14180-000, 14193-000] Lock+ Hydro Friends Fund XLV, FFP Project 2, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XLV Project No. 14180-000. 2. FFP Project 2, LLC Project No. 14193-000. Dated: March...

  9. 77 FR 12280 - Lock+ Hydro Friends Fund XL; FFP Project 56, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14189-000, 14198-000] Lock+ Hydro Friends Fund XL; FFP Project 56, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XL, Project No. 14189-000. 2. FFP Project 56, LLC, Project No. 14198-000. Dated...

  10. 77 FR 12280 - Lock+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14188-00o, 14200-000] Lock+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice Announcing Filing Priority for Preliminary Permit.... FFP Project 59, LLC, Project No. 14200-000. 2. Lock+ Hydro Friends Fund XXXVIII, Project No. 14188-000...

  11. 77 FR 12279 - Lock+ Hydro Friends Fund XLVII FFP Project 52, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14178-000, 14190-000] Lock+ Hydro Friends Fund XLVII FFP Project 52, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XLVII, Project No. 14178-000. 2. FFP Project 52, LLC, Project No. 14190-000. Dated...

  12. 77 FR 12281 - Lock+ Hydro Friends Fund XXXIV; FFP Project 58, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14187-000, 14199-000] Lock+ Hydro Friends Fund XXXIV; FFP Project 58, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XXXIV, Project No. 14187-000. 2. FFP Project 58, LLC, Project No. 14199-000. Dated...

  13. 77 FR 13318 - Lock+ Hydro Friends Fund IV, FFP Project 55, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14185-000, 14196-000] Lock+ Hydro Friends Fund IV, FFP Project 55, LLC; Notice Announcing Filing Priority for Preliminary Permit... Friends Fund IV: Project No. 14185-000. 2. FFP Project 55, LLC: Project No. 14196-000. Dated: February 29...

  14. 77 FR 12279 - Lock+ Hydro Friends Fund XLIV FFP Project 51, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14179-000, 14194-000] Lock+ Hydro Friends Fund XLIV FFP Project 51, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XLIV, Project No. 14179-000. 2. FFP Project 51, LLC, Project No. 14194-000. Dated...

  15. 77 FR 13318 - SV Hydro, LLC, Coffeeville, LLC, FFP Project 99, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14298-000, 14299-000, 14301-000] SV Hydro, LLC, Coffeeville, LLC, FFP Project 99, LLC; Notice Announcing Filing Priority for... follows: 1. FFP Project 99, LLC: Project No. 14301-000. 2. SV Hydro, LLC: Project No. 14298-000. 3...

  16. 78 FR 26758 - Applications for New Awards; School Leadership Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-08

    ... professional development programs. Invitational priority one encourages applicants to design projects that will... of Intent to Apply: June 7, 2013. Date of Pre-Application Meeting: May 22, 2013. Further information... competition to propose projects that will implement pre- and in-service programs that produce the most highly...

  17. 78 FR 691 - Maximum Loan Amount for Business and Industry Guaranteed Loans in Fiscal Year 2013

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-04

    ... provide financing assistance to as many projects as possible. In order for an existing B&I guaranteed loan...: (1) Qualify as a high priority project (a requirement of 7 CFR 4279.119(a)(1)(i)), scoring at least... more loans and target smaller loans/projects impacting more small businesses and will assist the Agency...

  18. 78 FR 27036 - Final Priority. National Institute on Disability and Rehabilitation Research-Traumatic Brain...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-09

    ... individuals with disabilities in conducting TBIMS research. Types of Priorities When inviting applications for... Rehabilitation Research--Traumatic Brain Injury Model Systems Centers Collaborative Research Project AGENCY... Services announces a priority for the Disability and Rehabilitation Research Projects and Centers Program...

  19. Final priorities; National Institute on Disability and Rehabilitation Research--Disability and Rehabilitation Research Projects and Centers Program--Rehabilitation Engineering Research Centers. Final priorities.

    PubMed

    2013-06-11

    The Assistant Secretary for Special Education and Rehabilitative Services announces priorities under the Disability and Rehabilitation Research Projects and Centers Program administered by the National Institute on Disability and Rehabilitation Research (NIDRR). Specifically, we announce priorities for a Rehabilitation Engineering Research Center (RERC) on Rehabilitation Strategies, Techniques, and Interventions (Priority 1), Information and Communication Technologies Access (Priority 2), Individual Mobility and Manipulation (Priority 3), and Physical Access and Transportation (Priority 4). The Assistant Secretary may use one or more of these priorities for competitions in fiscal year (FY) 2013 and later years. We take this action to focus research attention on areas of national need. We intend these priorities to improve community living and participation, health and function, and employment outcomes of individuals with disabilities.

  20. Avian Conservation Areas as a Proxy for Contaminated Soil Remediation

    PubMed Central

    Lin, Wei-Chih; Lin, Yu-Pin; Anthony, Johnathen; Ding, Tsun-Su

    2015-01-01

    Remediation prioritization frequently falls short of systematically evaluating the underlying ecological value of different sites. This study presents a novel approach to delineating sites that are both contaminated by any of eight heavy metals and have high habitat value to high-priority species. The conservation priority of each planning site herein was based on the projected distributions of eight protected bird species, simulated using 900 outputs of species distribution models (SDMs) and the subsequent application of a systematic conservation tool. The distributions of heavy metal concentrations were generated using a geostatistical joint-simulation approach. The uncertainties in the heavy metal distributions were quantified in terms of variability among 1000 realization sets. Finally, a novel remediation decision-making approach was presented for delineating contaminated sites in need of remediation based on the spatial uncertainties of multiple realizations and the priorities of conservation areas. The results thus obtained demonstrate that up to 42% of areas of high conservation priority are also contaminated by one or more of the heavy metal contaminants of interest. Moreover, as the proportion of the land for proposed remediated increased, the projected area of the pollution-free habitat also increased. Overall uncertainty, in terms of the false positive contamination rate, also increased. These results indicate that the proposed decision-making approach successfully accounted for the intrinsic trade-offs among a high number of pollution-free habitats, low false positive rates and robustness of expected decision outcomes. PMID:26193297

  1. 40 CFR 35.915 - State priority system and project priorty list.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.915 State priority system and project priorty list. Construction grants will be awarded... State priority system and list must be designed to achieve optimum water quality management consistent...

  2. 40 CFR 35.915 - State priority system and project priorty list.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.915 State priority system and project priorty list. Construction grants will be awarded... State priority system and list must be designed to achieve optimum water quality management consistent...

  3. 40 CFR 35.915 - State priority system and project priorty list.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.915 State priority system and project priorty list. Construction grants will be awarded... State priority system and list must be designed to achieve optimum water quality management consistent...

  4. 40 CFR 35.915 - State priority system and project priorty list.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.915 State priority system and project priorty list. Construction grants will be awarded... State priority system and list must be designed to achieve optimum water quality management consistent...

  5. Laser Imaging Detection and Ranging Performance in a High-Fidelity Lunar Terrain Field

    NASA Technical Reports Server (NTRS)

    Chuang, Jason

    2015-01-01

    The prime objective of this project is to evaluate Laser Imaging Detection and Ranging (LIDAR) systems and compare their performance for hazard avoidance when tested at the NASA Marshall Space Flight Center's (MSFC's) lunar high-fidelity terrain field (see fig. 1). Hazard avoidance is the ability to avoid boulders, holes, or slopes that would jeopardize a safe landing and the deployment of scientific payloads. This capability is critical for any sample return mission intending to land in challenging terrain. Since challenging terrain is frequently where the most scientifically attractive targets are, hazard avoidance will be among the highest priorities for future robotic exploration missions. The maturation of hazard avoidance sensing addressed in this project directly supports the MSFC Tier I priority of sample return.

  6. 40 CFR 35.915-1 - Reserves related to the project priority list.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-Clean Water Act § 35.915-1 Reserves related to the project priority list. In developing the fundable... § 35.908(b)(1)) for construction projects which use innovative or alternative waste water treatment...

  7. 40 CFR 35.915-1 - Reserves related to the project priority list.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-Clean Water Act § 35.915-1 Reserves related to the project priority list. In developing the fundable... § 35.908(b)(1)) for construction projects which use innovative or alternative waste water treatment...

  8. 40 CFR 35.915-1 - Reserves related to the project priority list.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-Clean Water Act § 35.915-1 Reserves related to the project priority list. In developing the fundable... § 35.908(b)(1)) for construction projects which use innovative or alternative waste water treatment...

  9. 34 CFR 263.21 - What priority is given to certain projects and applicants?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 1 2014-07-01 2014-07-01 false What priority is given to certain projects and... PROGRAMS Demonstration Grants for Indian Children Program § 263.21 What priority is given to certain... subject matters, including math and science, to enable Indian students to successfully transition to...

  10. American Indian Capacity Building in St. Paul, Minnesota.

    ERIC Educational Resources Information Center

    Eubanks, Don

    A 1996 research project in St. Paul, Minnesota, found high rates of poverty and unemployment in its American Indian population and a lack of connection between social service agencies and the Indian community. A follow-up project aimed to support the Indian community in identifying its own priorities for research and action. Eight focus groups…

  11. Pay As You Go: A Better Way of Funding School Construction.

    ERIC Educational Resources Information Center

    Carey, Kelley D.

    2000-01-01

    Pay-as-you-go funding (via local option sales taxes or earmarked property taxes) is superior to floating expensive bond issues to resolve school construction crises. Districts can plan projects more thoughtfully, focus on project priorities, avoid arbitrage problems and high insurance costs, and address socioeconomic considerations more equitably.…

  12. Top 10 research priorities relating to stroke nursing: a rigorous approach to establish a national nurse-led research agenda.

    PubMed

    Rowat, Anne; Pollock, Alex; St George, Bridget; Cowey, Eileen; Booth, Joanne; Lawrence, Maggie

    2016-11-01

    To determine the top 10 research priorities specific to stroke nursing. It is important that stroke nurses build their research capability and capacity. This project built on a previous James Lind Alliance prioritization project, which established the shared stroke research priorities of stroke survivors, carers and health professionals. Research priority setting project using James Lind Alliance methods; a survey for interim prioritization and a consensus meeting for final priority setting. Between September - November 2014, stroke nurses were invited to select their top 10 priorities from a previously established list of 226 unique unanswered questions. These data were used to generate a list of shared research priorities (interim priority setting stage). A purposefully selected group of stroke nurses attended a final consensus meeting (April 2015) to determine the top 10 research priorities. During the interim prioritization stage, 97 stroke nurses identified 28 shared priority treatment uncertainties. At the final consensus meeting, 27 stroke nurses reached agreement on the top 10 stroke nursing research priorities. Five of the top 10 questions relate to stroke-specific impairments and five relate to rehabilitation and long-term consequences of stroke. The research agenda for stroke nursing has now been clearly defined, facilitating nurses to undertake research, which is of importance to stroke survivors and carers and central to supporting optimal recovery and quality of life after stroke. © 2016 John Wiley & Sons Ltd.

  13. Clean Streams in Southern Sonoma County

    EPA Pesticide Factsheets

    This project broadens existing public/private partnerships to reduce pollutant loading at high-priority sites in the Sonoma Creek and Petaluma River watersheds by implementing activities called for in TMDLs for sediment, pesticides, and pathogens

  14. Priority programming for highway project selections.

    DOT National Transportation Integrated Search

    1981-01-01

    This report provides an introduction to the methodologies of priority programming as developed by state transportation departments in their highway and transportation project selection processes. It explains the interrelationships between needs studi...

  15. 76 FR 67720 - Lock+ Hydro Friends Fund XXXV; Riverbank Hydro No. 4, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14136-000; Project No. 14139-000] Lock+ Hydro Friends Fund XXXV; Riverbank Hydro No. 4, LLC; Notice Announcing Filing Priority... follows: 1. Lock+ Hydro Friends Fund XXXV--Project No. 14136-000 2. Riverbank Hydro No. 4, LLC--Project No...

  16. 40 CFR 47.125 - Eligible and priority projects and activities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... environmental pollution problems; (3) Projects to understand and assess a specific environmental issue or a... activities. 47.125 Section 47.125 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE NATIONAL ENVIRONMENTAL EDUCATION ACT GRANTS § 47.125 Eligible and priority projects and...

  17. 40 CFR 47.125 - Eligible and priority projects and activities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... environmental pollution problems; (3) Projects to understand and assess a specific environmental issue or a... activities. 47.125 Section 47.125 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE NATIONAL ENVIRONMENTAL EDUCATION ACT GRANTS § 47.125 Eligible and priority projects and...

  18. 40 CFR 47.125 - Eligible and priority projects and activities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... environmental pollution problems; (3) Projects to understand and assess a specific environmental issue or a... activities. 47.125 Section 47.125 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE NATIONAL ENVIRONMENTAL EDUCATION ACT GRANTS § 47.125 Eligible and priority projects and...

  19. 40 CFR 47.125 - Eligible and priority projects and activities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... environmental pollution problems; (3) Projects to understand and assess a specific environmental issue or a... activities. 47.125 Section 47.125 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE NATIONAL ENVIRONMENTAL EDUCATION ACT GRANTS § 47.125 Eligible and priority projects and...

  20. 40 CFR 47.125 - Eligible and priority projects and activities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... environmental pollution problems; (3) Projects to understand and assess a specific environmental issue or a... activities. 47.125 Section 47.125 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GRANTS AND OTHER FEDERAL ASSISTANCE NATIONAL ENVIRONMENTAL EDUCATION ACT GRANTS § 47.125 Eligible and priority projects and...

  1. 78 FR 35886 - Applications for New Awards; National Institute on Disability and Rehabilitation Research...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-14

    ... Disability and Rehabilitation Research (NIDRR)--Disability and Rehabilitation Research Projects and Centers... notice of final priorities for the Disability and Rehabilitation Research Projects and Centers Program... included in the notice of final priorities for the Disability and Rehabilitation Research Projects and...

  2. 7 CFR 1775.11 - Priority.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE... program. (a) Projects proposing to give priority for available services to rural communities having a... demonstrate sustainability of project without Federal financial support. ...

  3. 7 CFR 1775.11 - Priority.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE... program. (a) Projects proposing to give priority for available services to rural communities having a... demonstrate sustainability of project without Federal financial support. ...

  4. 7 CFR 1775.11 - Priority.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE... program. (a) Projects proposing to give priority for available services to rural communities having a... demonstrate sustainability of project without Federal financial support. ...

  5. 7 CFR 1775.11 - Priority.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE... program. (a) Projects proposing to give priority for available services to rural communities having a... demonstrate sustainability of project without Federal financial support. ...

  6. 75 FR 1651 - Multistate Conservation Grant Program; Priority List for Conservation Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-12

    ...-Johnson Sport Fish Restoration Act (16 U.S.C. 777 et seq.) and established the Multistate Conservation...; 91400-9410-0000-7B] Multistate Conservation Grant Program; Priority List for Conservation Projects... of wildlife and sport fish conservation projects from the Association of Fish and Wildlife Agencies...

  7. Impact of new medical technologies on health expenditures in Israel 2000-07.

    PubMed

    Rabinovich, Mordechai; Wood, Francis; Shemer, Joshua

    2007-01-01

    The aim of this study was to estimate the impact of new medical technologies on public healthcare expenditures in Israel over the period 2000-07. For each year, government estimates for the costs of new technologies recommended as high-priority for public funding were summarized. The ratio of projected costs of these technologies to total public healthcare expenditures was calculated and compared with actual governmental budget allocations for new technologies. Funding all new high-priority medical technologies would have increased healthcare expenditures by 2.1 percent per year. Government allocations for new technologies raised expenditures by 1.0 percent per year. New medical technologies significantly increase healthcare expenditures in Israel. Budgetary constraints have reduced their actual impact by 52 percent. This study indicates the need for an annual addition of 2 percent to public healthcare budget for funding new high-priority technologies.

  8. Traffic control device evaluation program : technical report.

    DOT National Transportation Integrated Search

    2015-03-01

    This project provides the Texas Department of Transportation with a mechanism to quickly and effectively conduct : high-priority, limited scope evaluations of traffic control devices. Work during the 20132014 fiscal year included : three main task...

  9. Maine Environmental Priorities Project: Summary of the Reports from the Technical Working Groups to the Steering Committee.

    ERIC Educational Resources Information Center

    National Association for Environmental Education, Miami, FL.

    The Maine Environmental Priorities Project (MEPP) is a comparative risk project designed to identify, compare, and rank the most serious environmental problems facing Maine. Once the problems are analyzed and ranked according to their threat or risk to Maine's ecological health, human health, and quality of life, the project will propose…

  10. Final priority; National Institute on Disability and Rehabilitation Research--Disability and Rehabilitation Projects and Centers Program--Rehabilitation Engineering Research Centers. Final priority.

    PubMed

    2013-06-19

    The Assistant Secretary for Special Education and Rehabilitative Services announces a priority for a Rehabilitation Engineering Research Center (RERC) on Technologies to Support Successful Aging with Disability under the Disability and Rehabilitation Research Projects and Centers Program administered by the National Institute on Disability and Rehabilitation Research (NIDRR). The Assistant Secretary may use this priority for a competition in fiscal year (FY) 2013 and later years. We take this action to focus research attention on areas of national need. We intend to use this priority to improve outcomes for individuals with disabilities.

  11. Final priority; National Institute on Disability and Rehabilitation Research--Disability and Rehabilitation Research Projects and Centers Program--Rehabilitation Engineering Research Centers. Final priority.

    PubMed

    2013-06-14

    The Assistant Secretary for Special Education and Rehabilitative Services announces a priority for a Rehabilitation Engineering Research Center (RERC) on Universal Interfaces and Information Technology Access under the Disability and Rehabilitation Research Projects and Centers Program administered by the National Institute on Disability and Rehabilitation Research (NIDRR). The Assistant Secretary may use this priority for a competition in fiscal year (FY) 2013 and later years. We take this action to focus research attention on areas of national need. We intend to use this priority to improve outcomes for individuals with disabilities.

  12. Prototype crawling robotics system for remote visual inspection of high-mast light poles.

    DOT National Transportation Integrated Search

    1997-01-01

    This report presents the results of a project to develop a crawling robotics system for the remote visual inspection of high-mast light poles in Virginia. The first priority of this study was to develop a simple robotics application that would reduce...

  13. Review of the Fiscal Year 2013 (FY13) Defense Environmental International Cooperation (DEIC) Program

    DTIC Science & Technology

    2014-03-01

    year. Of the remaining projects, the Advisory Group then identifies those projects that it feels merit support, but were not as high a priority... remaining 20 percent of the original budget. Thus, even if a project were listed for such funding, it would not necessarily be funded even if the full...DEIC program budget were available, since the total costs for such projects exceed the overall remaining DEIC budget (even before any cuts). This

  14. 34 CFR 1100.6 - What priorities may the Director establish?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... literacy. (b) Expanding the use of technology in literacy programs. One of the Institute's major projects... economy, and the well-being of children. Projects that enhance this effort will be given priority...

  15. 34 CFR 1100.6 - What priorities may the Director establish?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... literacy. (b) Expanding the use of technology in literacy programs. One of the Institute's major projects... economy, and the well-being of children. Projects that enhance this effort will be given priority...

  16. 34 CFR 1100.6 - What priorities may the Director establish?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... literacy. (b) Expanding the use of technology in literacy programs. One of the Institute's major projects... economy, and the well-being of children. Projects that enhance this effort will be given priority...

  17. 77 FR 24197 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-23

    ... Drawing Mississippi 8 Hydro, LLC Project No. 13010-002. FFP Project 98, LLC Project No. 14272-000. The..., or her designee, will conduct a random drawing to determine the filing priority of the applicants... section 4.37 of its regulations.\\2\\ The priority established by this drawing will be used to determine...

  18. 77 FR 9915 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-21

    ... Drawing Lock+ Hydro Friends Fund XLI Project No. 14182-000 FFP Project 54, LLC Project No. 14192-000 The... her designee, will conduct a random drawing to determine the filing priority of the applicants... section 4.37 of its regulations.\\2\\ The priority established by this drawing will be used to determine...

  19. Priority Determination for AVC Funded R&D Projects.

    ERIC Educational Resources Information Center

    Wilkinson, Gene L.

    As an extension of ideas suggested in an earlier paper which proposed a project control system for Indiana University's Audio-Visual Center (see EM 010 306), this paper examines the establishment of project legitimacy and priority within the system and reviews the need to stimulate specific research proposals as well as generating a matrix of…

  20. 40 CFR 35.915-1 - Reserves related to the project priority list.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... § 35.908(b)(1)) for construction projects which use innovative or alternative waste water treatment... AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.915-1 Reserves related to the project priority list. In developing the fundable...

  1. 40 CFR 35.915-1 - Reserves related to the project priority list.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... § 35.908(b)(1)) for construction projects which use innovative or alternative waste water treatment... AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.915-1 Reserves related to the project priority list. In developing the fundable...

  2. 7 CFR 3430.1004 - Project types and priorities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... ADMINISTRATIVE PROVISIONS Sun Grant Program § 3430.1004 Project types and priorities. (a) Project types. The Sun... on the basis of merit, quality, and relevance to advancing the purposes of the Sun Grant Program. (2... provided by NIFA for the Sun Grant Program that are not allocated to the Subcenter. For the Subcenter, the...

  3. 7 CFR 3430.1004 - Project types and priorities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ADMINISTRATIVE PROVISIONS Sun Grant Program § 3430.1004 Project types and priorities. (a) Project types. The Sun... on the basis of merit, quality, and relevance to advancing the purposes of the Sun Grant Program. (2... provided by NIFA for the Sun Grant Program that are not allocated to the Subcenter. For the Subcenter, the...

  4. 7 CFR 3430.1004 - Project types and priorities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... ADMINISTRATIVE PROVISIONS Sun Grant Program § 3430.1004 Project types and priorities. (a) Project types. The Sun... on the basis of merit, quality, and relevance to advancing the purposes of the Sun Grant Program. (2... provided by NIFA for the Sun Grant Program that are not allocated to the Subcenter. For the Subcenter, the...

  5. 7 CFR 3430.1004 - Project types and priorities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... ADMINISTRATIVE PROVISIONS Sun Grant Program § 3430.1004 Project types and priorities. (a) Project types. The Sun... on the basis of merit, quality, and relevance to advancing the purposes of the Sun Grant Program. (2... provided by NIFA for the Sun Grant Program that are not allocated to the Subcenter. For the Subcenter, the...

  6. Geologic Assessment of Coal in the Colorado Plateau: Arizona, Colorado, New Mexico, and Utah

    USGS Publications Warehouse

    Kirschbaum, Mark A.; Roberts, Lauara N.R.; Biewick, Laura

    2000-01-01

    This CD-ROM set contains a geologic assessment of coal deposits of the Colorado Plateau region and new resource estimates for selected assessment units within the Colorado Plateau. Original resource estimates (in-place resources before production) for the 12 priority assessment units of the Colorado Plateau exceed one half trillion short tons of coal in beds greater than 1 ft thick and under less than 6,000 ft of overburden. The coal is high quality and low sulfur, and a portion of these resources will provide future energy production for the Nation. Disc 1, in Portable Document Format, contains results of the assessment in summary and (or) technical reports for 12 priority coal assessment units in the Colorado Plateau and also contains an ArcView Data Publisher project, which is an interactive geographic information system of digital data collected during the assessment. Disc 2 contains stratigraphic data bases for seven of the priority coal assessment areas within the Colorado Plateau region and an ArcView project identical to the ArcView Data Publisher project on disc 1 except that it retains some of the functionality that is disabled in the ArcView Data Publisher program.

  7. PROCEDURE FOR DETERMINATION OF SEDIMENT PARTICLE SIZE (GRAIN SIZE)

    EPA Science Inventory

    Sediment quality and sediment remediation projects have become a high priority for USEPA. Sediment particle size determinations are used in environmental assessments for habitat characterization, chemical normalization, and partitioning potential of chemicals. The accepted met...

  8. Tracking and data systems support for the Helios project. Volume 3: DSN support of Project Helios May 1976 - June 1977

    NASA Technical Reports Server (NTRS)

    Goodwin, P. S.; Jensen, W. N.; Flanagan, F. M.

    1979-01-01

    Spacecraft extended mission coverage does not generally carry a high priority, but Helios was fortunate in that a combination of separated viewperiods and unique utilization of the STDN Goldstone antenna have provided a considerable amount of additional science data return, particularly at key times such a perihelion and/or solar occultation.

  9. Concept development and needs identification for intelligent network flow optimization (INFLO) : functional and performance requirements, and high-level data and communication needs.

    DOT National Transportation Integrated Search

    2012-11-01

    The purpose of this project is to develop for the Intelligent Network Flow Optimization (INFLO), which is one collection (or bundle) of high-priority transformative applications identified by the United States Department of Transportation (USDOT) Mob...

  10. Development of a Traumatic Brain Injury Assessment Score using Novel Biomarkers Discovered Through Autoimmune Profiling

    DTIC Science & Technology

    2014-08-15

    N12-P12 TSNRP Research Priorities that Study or Project Addresses Primary Priority Force Health Protection: Fit and ready force Deploy...Mentoring: Health policy Recruitment and retention Preparing tomorrow’s leaders Care of the caregiver Other: Secondary Priority Force... caregiver Other: 5 Principal Investigator (Buonora, John, E) USU Project Number: N12-P12 Progress Towards Achievement of Specific Aims of

  11. A Pedagogy of Civic Engagement for the Undergraduate Political Science Classroom

    ERIC Educational Resources Information Center

    DeLaet, Debra L.

    2016-01-01

    This article provides an overview of a classroom project, titled the Priorities Project, which is designed to promote responsible and informed civic engagement on the part of students in upper level political science courses at Drake University. It provides an overview of the Priorities Project, a brief summary highlighting the process and results…

  12. Implementation of the "Education" Priority National Project in Tiumen Oblast

    ERIC Educational Resources Information Center

    Tavokin, Evgenii Petrovich

    2009-01-01

    In the two years that the "Education" priority national project has been in the process of implementation, it has been found that in spite of its obviously abstract character in terms of strategy (a shortcoming that is characteristic of all four of the national projects), a flexible mechanism of state and civic administration is built…

  13. Fiscal Year 2018 National Environmental Information Exchange Network Grant Solicitation Notice

    EPA Pesticide Factsheets

    The Exchange Network Grant Program provides funding for projects that are in line with Exchange Network priorities. The primary outcome expected from EN assistance agreements is improved access to, and exchange of, high quality environmental data.

  14. 7 CFR 3430.704 - Project types and priorities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Biobased Products Development. Research, development, and demonstration activities to support— (i) The....704 Agriculture Regulations of the Department of Agriculture (Continued) NATIONAL INSTITUTE OF FOOD... ADMINISTRATIVE PROVISIONS Biomass Research and Development Initiative § 3430.704 Project types and priorities. (a...

  15. Physiotherapy Research Priorities in Switzerland: Views of the Various Stakeholders.

    PubMed

    Nast, Irina; Tal, Amir; Schmid, Stefan; Schoeb, Veronika; Rau, Barbara; Barbero, Marco; Kool, Jan

    2016-09-01

    Research priorities, defined by multiple stakeholders, can proximally facilitate the coordination of research projects and national and international cooperation and distally further improve the quality of physiotherapy practice. The aim of this study was therefore to establish physiotherapy research priorities in Switzerland considering multiple stakeholders' opinions. A mixed methods design was chosen. For a qualitative identification of physiotherapy research topics, 18 focus group discussions and 23 semi-structured interviews/written commentaries were conducted. For the quantitative analysis, 420 participants prioritized research topics using a two-round Delphi questionnaire survey. The following stakeholder groups were surveyed in the German-speaking, French-speaking and Italian-speaking regions of Switzerland: physiotherapy researchers, practitioners and educators, representatives of patient organizations, public health organizations, health insurers, physicians, nurses, occupational therapists and other health professionals, as well as physical educators. The top five overall physiotherapy research priorities identified were as follows: physiotherapy treatment, physiotherapy assessment and diagnosis, prevention, physiotherapist-patient interaction and physiotherapy professional education at the bachelor level. With regard to diagnostic groups, the highest priorities were placed on musculoskeletal disorders, neurology, orthopaedics, geriatrics and ergonomics/occupational health. Consensus was moderate to high, and only few differences between stakeholder groups were revealed. Research directly related to physiotherapy treatment is of highest priority. It should focus on diagnostic groups related to chronicity in anticipation of demographic changes. Multidisciplinary networks for research and practice, alongside sound coordination of research projects, should increase the impact of physiotherapy research. An accurate dissemination of research priorities, defined and supported by multiple stakeholder groups, might strengthen their impact on research and practice. Copyright © 2015 John Wiley & Sons, Ltd. Copyright © 2015 John Wiley & Sons, Ltd.

  16. 7 CFR 3430.204 - Project types and priorities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 15 2011-01-01 2011-01-01 false Project types and priorities. 3430.204 Section 3430.204 Agriculture Regulations of the Department of Agriculture (Continued) NATIONAL INSTITUTE OF FOOD AND AGRICULTURE COMPETITIVE AND NONCOMPETITIVE NON-FORMULA FEDERAL ASSISTANCE PROGRAMS-GENERAL AWARD...

  17. 7 CFR 3430.904 - Project types and priorities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Project types and priorities. 3430.904 Section 3430.904 Agriculture Regulations of the Department of Agriculture (Continued) COOPERATIVE STATE RESEARCH, EDUCATION, AND EXTENSION SERVICE, DEPARTMENT OF AGRICULTURE COMPETITIVE AND NONCOMPETITIVE NON-FORMULA...

  18. 78 FR 26509 - Final Priority; National Institute on Disability and Rehabilitation Research-Disability and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-07

    ... Institute on Disability and Rehabilitation Research--Disability and Rehabilitation Research Projects... Rehabilitative Services announces a priority under the Disability Rehabilitation Research Projects and Centers Program administered by the National Institute on Disability and Rehabilitation Research (NIDRR...

  19. 77 FR 13317 - Lock+ Hydro Friends Fund XII, BOST2, LLC, et al.; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... al.] Lock+ Hydro Friends Fund XII, BOST2, LLC, et al.; Notice Announcing Filing Priority for Preliminary Permit Applications Project No. Lock+ Hydro Friends Fund XII 14260-000 BOST2, LLC 14264-000.... 2. BOST2, LLC: Project No. 14264-000. 3. Lock+ Hydro Friends Fund XII: Project No. 14260-000. 4...

  20. Comparative Analysis of Results from Three Recent Non-Separated Concurrent-Flow High Occupancy Freeway Lane Projects : Boston, Santa Monica and Miami

    DOT National Transportation Integrated Search

    1978-06-01

    In order to move more people in fewer vehicles with limited capital investment, priorities for High Occupancy Vehicles (HOV) have been developed and implemented over the past several years. This study focuses on one of the options of HOV: non-separat...

  1. Governance factors in the identification of global conservation priorities for mammals

    PubMed Central

    Eklund, Johanna; Arponen, Anni; Visconti, Piero; Cabeza, Mar

    2011-01-01

    Global conservation priorities have often been identified based on the combination of species richness and threat information. With the development of the field of systematic conservation planning, more attention has been given to conservation costs. This leads to prioritizing developing countries, where costs are generally low and biodiversity is high. But many of these countries have poor governance, which may result in ineffective conservation or in larger costs than initially expected. We explore how the consideration of governance affects the selection of global conservation priorities for the world's mammals in a complementarity-based conservation prioritization. We use data on Control of Corruption (Worldwide Governance Indicators project) as an indicator of governance effectiveness, and gross domestic product per capita as an indicator of cost. We show that, while core areas with high levels of endemism are always selected as important regardless of governance and cost values, there are clear regional differences in selected sites when biodiversity, cost or governance are taken into account separately. Overall, the analysis supports the concentration of conservation efforts in most of the regions generally considered of high priority, but stresses the need for different conservation approaches in different continents owing to spatial patterns of governance and economic development. PMID:21844045

  2. Identifying appropriate protected areas for endangered fern species under climate change.

    PubMed

    Wang, Chun-Jing; Wan, Ji-Zhong; Zhang, Zhi-Xiang; Zhang, Gang-Min

    2016-01-01

    The management of protected areas (PAs) is widely used in the conservation of endangered plant species under climate change. However, studies that have identified appropriate PAs for endangered fern species are rare. To address this gap, we must develop a workflow to plan appropriate PAs for endangered fern species that will be further impacted by climate change. Here, we used endangered fern species in China as a case study, and we applied conservation planning software coupled with endangered fern species distribution data and distribution modeling to plan conservation areas with high priority protection needs under climate change. We identified appropriate PAs for endangered fern species under climate change based on the IUCN protected area categories (from Ia to VI) and planned additional PAs for endangered fern species. The high priority regions for protecting the endangered fern species were distributed throughout southern China. With decreasing temperature seasonality, the priority ranking of all endangered fern species is projected to increase in existing PAs. Accordingly, we need to establish conservation areas with low climate vulnerability in existing PAs and expand the conservation areas for endangered fern species in the high priority conservation regions.

  3. Governance factors in the identification of global conservation priorities for mammals.

    PubMed

    Eklund, Johanna; Arponen, Anni; Visconti, Piero; Cabeza, Mar

    2011-09-27

    Global conservation priorities have often been identified based on the combination of species richness and threat information. With the development of the field of systematic conservation planning, more attention has been given to conservation costs. This leads to prioritizing developing countries, where costs are generally low and biodiversity is high. But many of these countries have poor governance, which may result in ineffective conservation or in larger costs than initially expected. We explore how the consideration of governance affects the selection of global conservation priorities for the world's mammals in a complementarity-based conservation prioritization. We use data on Control of Corruption (Worldwide Governance Indicators project) as an indicator of governance effectiveness, and gross domestic product per capita as an indicator of cost. We show that, while core areas with high levels of endemism are always selected as important regardless of governance and cost values, there are clear regional differences in selected sites when biodiversity, cost or governance are taken into account separately. Overall, the analysis supports the concentration of conservation efforts in most of the regions generally considered of high priority, but stresses the need for different conservation approaches in different continents owing to spatial patterns of governance and economic development.

  4. Comprehensive evaluation on transit signal priority system impacts using field observed traffic data

    DOT National Transportation Integrated Search

    2007-06-15

    To improve the level of service for Community Transit (CT) buses, the South Snohomish Regional Transit Signal Priority (SS-RTSP) project has been launched. To understand the overall benefit of this project, the SS-RTSP system was tested and evaluated...

  5. 75 FR 21270 - Office of Special Education and Rehabilitative Services; Overview Information; National Institute...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ... Information; National Institute on Disability and Rehabilitation Research (NIDRR)--Disability and... notice of final priorities for the Disability and Rehabilitation Research Projects and Centers program... priority for the Disability and Rehabilitation Research Projects and Centers Program, published elsewhere...

  6. 78 FR 34897 - Final Priorities; National Institute on Disability and Rehabilitation Research-Disability and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ....133E-8.] Final Priorities; National Institute on Disability and Rehabilitation Research--Disability and Rehabilitation Research Projects and Centers Program--Rehabilitation Engineering Research Centers AGENCY: Office... under the Disability and Rehabilitation Research Projects and Centers Program administered by the...

  7. 77 FR 40601 - Final Priority: Disability and Rehabilitation Research Projects and Centers Program; Disability...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ... analyses of data, producing observational findings, and creating other sources of research-based... provide a rationale for the stage of research being proposed and the research methods associated with the... DEPARTMENT OF EDUCATION Final Priority: Disability and Rehabilitation Research Projects and...

  8. 78 FR 27198 - Applications for New Awards; National Institute on Disability and Rehabilitation Research...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-09

    ... Rehabilitation Research--Traumatic Brain Injury Model Systems Centers Collaborative Research Project AGENCY... Brain Injury Model Systems Centers Collaborative Research Projects; Notice inviting applications for new... competition. Priority 1, the DRRP Priority for the Traumatic Brain Injury Model Systems Centers Collaborative...

  9. Comprehensive evaluation on transit signal priority system impacts using field observed traffic data (Phase One)

    DOT National Transportation Integrated Search

    2006-08-01

    To improve the level of Community Transit (CT) services, the South Snohomish Regional Transit Signal Priority (SS-RTSP) project has been launched. To understand the overall benefit of this project, the SS-RTSP system (phase one) was tested and evalua...

  10. Defining conservation priorities for freshwater fishes according to taxonomic, functional, and phylogenetic diversity

    USGS Publications Warehouse

    Strecker, A.L.; Olden, J.D.; Whittier, Joanna B.; Paukert, C.P.

    2011-01-01

    To date, the predominant use of systematic conservation planning has been to evaluate and conserve areas of high terrestrial biodiversity. Although studies in freshwater ecosystems have received recent attention, research has rarely considered the potential tradeoffs between protecting different dimensions of biodiversity and the ecological processes that maintain diversity. We provide the first systematic prioritization for freshwaters (focusing on the highly threatened and globally distinct fish fauna of the Lower Colorado River Basin, USA) simultaneously considering scenarios of: taxonomic, functional, and phylogenetic diversity;contemporary threats to biodiversity (including interactions with nonnative species);and future climate change and human population growth. There was 75% congruence between areas of highest conservation priority for different aspects of biodiversity, suggesting that conservation efforts can concurrently achieve strong complementarity among all types of diversity. However, sizable fractions of the landscape were incongruent across conservation priorities for different diversity scenarios, underscoring the importance of considering multiple dimensions of biodiversity and highlighting catchments that contribute disproportionately to taxonomic, functional, and phylogenetic diversity in the region. Regions of projected human population growth were not concordant with conservation priorities;however, higher human population abundance will likely have indirect effects on native biodiversity by increasing demand for water. This will come in direct conflict with projected reductions in precipitation and warmer temperatures, which have substantial overlap with regions of high contemporary diversity. Native and endemic fishes in arid ecosystems are critically endangered by both current and future threats, but our results highlight the use of systematic conservation planning for the optimal allocation of limited resources that incorporates multiple and complementary conservation values describing taxonomic, functional, and phylogenetic diversity. ??2011 by the Ecological Society of America.

  11. Defining conservation priorities for freshwater fishes according to taxonomic, functional, and phylogenetic diversity

    USGS Publications Warehouse

    Strecker, Angela L.; Olden, Julian D.; Whittier, Joanna B.; Paukert, Craig P.

    2011-01-01

    To date, the predominant use of systematic conservation planning has been to evaluate and conserve areas of high terrestrial biodiversity. Although studies in freshwater ecosystems have received recent attention, research has rarely considered the potential trade-offs between protecting different dimensions of biodiversity and the ecological processes that maintain diversity. We provide the first systematic prioritization for freshwaters (focusing on the highly threatened and globally distinct fish fauna of the Lower Colorado River Basin, USA) simultaneously considering scenarios of: taxonomic, functional, and phylogenetic diversity; contemporary threats to biodiversity (including interactions with nonnative species); and future climate change and human population growth. There was 75% congruence between areas of highest conservation priority for different aspects of biodiversity, suggesting that conservation efforts can concurrently achieve strong complementarity among all types of diversity. However, sizable fractions of the landscape were incongruent across conservation priorities for different diversity scenarios, underscoring the importance of considering multiple dimensions of biodiversity and highlighting catchments that contribute disproportionately to taxonomic, functional, and phylogenetic diversity in the region. Regions of projected human population growth were not concordant with conservation priorities; however, higher human population abundance will likely have indirect effects on native biodiversity by increasing demand for water. This will come in direct conflict with projected reductions in precipitation and warmer temperatures, which have substantial overlap with regions of high contemporary diversity. Native and endemic fishes in arid ecosystems are critically endangered by both current and future threats, but our results highlight the use of systematic conservation planning for the optimal allocation of limited resources that incorporates multiple and complementary conservation values describing taxonomic, functional, and phylogenetic diversity.

  12. Is Combat Exposure Predictive of Higher Preoperative Stress in Military Members?

    DTIC Science & Technology

    2015-01-26

    Bopp, Eric, Joseph USU Project Number: N12-P16 4 TSNRP Research Priorities that Study or Project Addresses Primary Priority Force Health...of the caregiver Other: Principal Investigator: Bopp, Eric, Joseph USU Project Number: N12-P16 5 Background The preoperative...e.g., diabetes, thyroid disorders), and (c) autoimmune disorders (e.g., Sjogren’s syndrome ). Patients arriving to the Preoperative Teaching Unit

  13. Concept development and needs identification for intelligent network flow optimization (INFLO) : test readiness assessment.

    DOT National Transportation Integrated Search

    2012-11-01

    The purpose of this project is to develop for the Intelligent Network Flow Optimization (INFLO), which is one collection (or bundle) of high-priority transformative applications identified by the United States Department of Transportation (USDOT) Mob...

  14. Evaluation and implementation of an improved methodology for earthquake ground response analysis : uniform treatment source, path and site effects.

    DOT National Transportation Integrated Search

    2008-12-01

    Shortly after the 1994 Northridge Earthquake, Caltrans geotechnical engineers charged with developing site-specific : response spectra for high priority California bridges initiated a research project aimed at broadening their perspective : from simp...

  15. Future timber harvests on the Chippewa and Superior National Forests in Minnesota.

    Treesearch

    Blair Orr; Joseph Buongiorno; Timothy Young; David C. Lothner; Edwin Kallio

    1985-01-01

    Timber harvests on the Superior and Chippewa National Forests in Minnesota are projected to increase substantially by 2030. The increasing demand for aspen may affect the total harvests. Both forests need to give high priority to aspen management.

  16. Concept development and needs identification for intelligent network flow optimization (INFLO) : concept of operations.

    DOT National Transportation Integrated Search

    2012-06-01

    The purpose of this project is to develop for the Intelligent Network Flow Optimization (INFLO), which is one collection (or bundle) of high-priority transformative applications identified by the United States Department of Transportation (USDOT) Mob...

  17. 78 FR 26626 - Applications for New Awards; National Institute on Disability and Rehabilitation Research...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-07

    ... Rehabilitation Research--Disability and Rehabilitation Research Projects--Inclusive Cloud and Web Computing... Rehabilitation Research Projects (DRRPs)--Inclusive Cloud and Web Computing Notice inviting applications for new...#DRRP . Priorities: Priority 1--DRRP on Inclusive Cloud and Web Computing-- is from the notice of final...

  18. 77 FR 10739 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... Drawing Project No. FFP Project 91, LLC 14275-000 Riverbank Hydro No. 23, LLC 14279-000 Lock+ Hydro... conduct a random drawing to determine the filing priority of the applicants identified in this notice. The...\\ The priority established by this drawing will be used to determine which applicant, among those with...

  19. 76 FR 16408 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... Drawing Lock+ Hydro Friends Fund XLV..... Project No. 13741-000. FFP Missouri 9, LLC Project No. 13748-000... random drawing to determine the filing priority of the applicants identified in this notice. The...\\ The priority established by this drawing will be used to determine which applicant, among those with...

  20. 76 FR 16408 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... Drawing Lock+ Hydro Friends Fund XXXVII.. Project No. 13738-000. FFP Missouri 6, LLC Project No. 13761-000... random drawing to determine the filing priority of the applicants identified in this notice. The...\\ The priority established by this drawing will be used to determine which applicant, among those with...

  1. 76 FR 16408 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... Drawing Lock+ Hydro Friends Fund XLII.... Project No. 13739-000. FFP Missouri 10, LLC Project No. 13751... conduct a random drawing to determine the filing priority of the applicants identified in this notice. The...\\ The priority established by this drawing will be used to determine which applicant, among those with...

  2. 76 FR 33744 - Final Priority; National Institute on Disability and Rehabilitation Research (NIDRR)-Disability...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-09

    ... and Rehabilitation Research (NIDRR)--Disability Rehabilitation Research Project (DRRP)--Disability in... Rehabilitative Services announces a funding priority for the Disability and Rehabilitation Research Projects and...) 2011 and later years. We take this action to focus research attention on areas of national need. We...

  3. 78 FR 13600 - Proposed Priority-National Institute on Disability and Rehabilitation Research-Traumatic Brain...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-28

    ... designs. The research must focus on outcomes in one or more of the following domains identified in NIDRR's... Rehabilitation Research--Traumatic Brain Injury Model Systems Centers Collaborative Research Project [CFDA Number... Services proposes a priority under the Disability and Rehabilitation Research Projects and Centers Program...

  4. The ARRA investment in CER: a description of the midstream evaluation and how the funds were allocated and CER priorities addressed.

    PubMed

    Esposito, Dominick; Yong, Pierre L; Rich, Eugene; Geonnotti, Kristin; Kimmey, Laura D

    2014-11-01

    To describe the evaluation design of the American Recovery and Reinvestment Act of 2009 comparative effectiveness research (CER) investment, how funds were allocated and how CER priorities were addressed. Primary and secondary data included information from redacted project proposals, an investigator survey and federal project officers, investigators and expert panel discussions. More than 420 projects (US$1.1 billion) were awarded. Those generating new or synthesizing existing CER made up the plurality (194, or US$524 million). Data infrastructure projects were the second-largest area (28%, US$302 million). More than three-fourths addressed at least one priority population, condition category or intervention category. These investments expanded the nation's CER activities and its future capacity to conduct CER.

  5. Supporting Museums--Serving Communities: An Evaluation of the Museums for America Program. Executive Summary

    ERIC Educational Resources Information Center

    Institute of Museum and Library Services, 2011

    2011-01-01

    Museums for America (MFA) is the largest IMLS grant program for museums; it supports institutions by investing in high-priority, high-value activities that are clearly linked to the institution's strategic plan and enhance its value to its community. MFA grants situate projects within a framework of meeting three strategic goals: engaging…

  6. Chapter 9. Mechanical plant control

    Treesearch

    Richard Stevens; Steven B. Monsen

    2004-01-01

    When planning a restoration or rehabilitation project, proper equipment selection should be a high priority. Equipment should be selected that is adapted to the treatment site, and that when properly used, will fulfill and add to the objectives of the treatment. Equipment should be economical and ecologically sound.

  7. 'Communicate to vaccinate' (COMMVAC). building evidence for improving communication about childhood vaccinations in low- and middle-income countries: protocol for a programme of research.

    PubMed

    Lewin, Simon; Hill, Sophie; Abdullahi, Leyla H; de Castro Freire, Sara Bensaude; Bosch-Capblanch, Xavier; Glenton, Claire; Hussey, Gregory D; Jones, Catherine M; Kaufman, Jessica; Lin, Vivian; Mahomed, Hassan; Rhoda, Linda; Robinson, Priscilla; Waggie, Zainab; Willis, Natalie; Wiysonge, Charles S

    2011-12-02

    Effective provider-parent communication can improve childhood vaccination uptake and strengthen immunisation services in low- and middle-income countries (LMICs). Building capacity to improve communication strategies has been neglected. Rigorous research exists but is not readily found or applicable to LMICs, making it difficult for policy makers to use it to inform vaccination policies and practice.The aim of this project is to build research knowledge and capacity to use evidence-based strategies for improving communication about childhood vaccinations with parents and communities in LMICs. This project is a mixed methods study with six sub-studies. In sub-study one, we will develop a systematic map of provider-parent communication interventions for childhood vaccinations by screening and extracting data from relevant literature. This map will inform sub-study two, in which we will develop a taxonomy of interventions to improve provider-parent communication around childhood vaccination. In sub-study three, the taxonomy will be populated with trial citations to create an evidence map, which will also identify how evidence is linked to communication barriers regarding vaccination. In the project's fourth sub-study, we will present the interventions map, taxonomy, and evidence map to international stakeholders to identify high-priority topics for systematic reviews of interventions to improve parent-provider communication for childhood vaccination. We will produce systematic reviews of the effects of high-priority interventions in the fifth sub-study. In the sixth and final sub-study of the project, evidence from the systematic reviews will be translated into accessible formats and messages for dissemination to LMICs. This project combines evidence mapping, conceptual and taxonomy development, priority setting, systematic reviews, and knowledge transfer. It will build and share concepts, terms, evidence, and resources to aid the development of communication strategies for effective vaccination programmes in LMICs.

  8. Projections, plans, policies and politics in Prince George: reflections on five years of climate change adaptation in a northern Canadian community

    NASA Astrophysics Data System (ADS)

    Picketts, I. M.; Dery, S. J.; Curry, J.

    2013-12-01

    The City of Prince George, in central British Columbia, Canada, has partnered with academics and collaborators for over five years to address climate change adaptation at the local level. The first phase of research involved conducting a detailed overview of past climate trends and future projections for the region using the outputs of GCMs and downscaled RCMs. This information was communicated to senior local staff and community members, and feedback was applied to create a detailed adaptation strategy for the City, which identified priority impacts and outlined potential strategies to address them at the local level. The top priority impacts for Prince George are forest changes, increased flooding, and impacts to transportation infrastructure. During a second implementation phase of the project, eight local initiatives were completed focusing on: incorporating adaptation into a local sustainability plan and land use plan; exploring impacts related to forests, flooding and transportation infrastructure; and assessing trends and projections in freeze-thaw cycles and heavy rainfall events. This presentation will outline the adaptation initiatives undertaken in the City of Prince George during the second phase of research, and evaluate their effectiveness through reflections from interviews with local planners, engineers, managers, community champions and politicians. The initiatives deemed to be most successful - and most likely to be implemented - focus on topics that: are of high public concern; have clear cost implications; incorporate adaptation into policy; and/or incorporate adaptation into an ongoing project. Outcomes highlight challenges local researchers, practitioners and leaders face as they strive to implement proactive adaptation measures in policy and practice without strong support from policy and professional practices, and with a paucity of successful case study examples to build upon. Outcomes also reveal challenges as municipalities strive to do ';more with less' and work within the reality that adaptation is not generally a high public or political priority. Internal capacity and external support are vital for adaptation success at the local level.

  9. 75 FR 70670 - Final Vehicle Safety Rulemaking and Research Priority Plan 2010-2013

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-18

    ... management tool as well as a means to communicate to the public NHTSA's highest priorities to meet the Nation's motor vehicle safety challenges. Among them are programs and projects involving rollover crashes... in this plan. This plan lists the programs and projects the agency anticipates working on even though...

  10. 76 FR 16407 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... Drawing Lock+ Hydro Friends Fund XLVI.... Project No. 13734-000. FFP Missouri 17, LLC Project No. 13754... Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority... applications as provided in section 4.37 of its regulations.\\3\\ The priority established by this drawing will...

  11. 76 FR 16409 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... Drawing Lock+ Hydro Friends Fund XLVII... Project No. 13743-000. FFP Missouri 16, LLC Project No. 13753... Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority... applications as provided in section 4.37 of its regulations.\\3\\ The priority established by this drawing will...

  12. 76 FR 16409 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... Drawing Lock+ Hydro Friends Fund XXXIV... Project No. 13742-000. FFP Missouri 5, LLC Project No. 13757-000... Commission, or her designee, will conduct a random drawing to determine the filing priority of the applicants... section 4.37 of its regulations.\\3\\ The priority established by this drawing will be used to determine...

  13. 7 CFR 1778.7 - Project priority.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... shortage. Grants made in accordance with § 1778.11(b) of this part to assist an established water system remedy an acute shortage of quality water or correct a significant decline in the quantity or quality of... 7 Agriculture 12 2011-01-01 2011-01-01 false Project priority. 1778.7 Section 1778.7 Agriculture...

  14. The National Research Initiative Competitive Grants Program in animal reproduction: changes in priorities and scope relevant to United States animal agriculture.

    PubMed

    Mirando, M A

    2007-03-01

    The National Research Initiative (NRI) Competitive Grants Program is the USDA's major competitive grants program and is administered by the Cooperative State Research, Education, and Extension Service. The NRI was authorized by the US Congress in the 1990 Farm Bill at a funding level of $500 million; however, the maximal NRI appropriation was $181.17 million in fiscal year (FY) 2006. Across all programs, the NRI is mandated to use 40% of its funding to support mission-linked research. Since its inception in 1991, the NRI has funded competitive grants in the discipline of animal reproduction. Before 2004, the Animal Reproduction Program funded a broad range of projects encompassing almost every subdiscipline in reproductive biology of farm animals, including aquatic species important to the aquaculture industry and laboratory animals. During FY 2004, the NRI Animal Reproduction Program narrowed the focus of its funding priorities to 5 issue-based topics in an effort to make greater measurable improvements in a few high-impact areas over the next 10 years. Funding priorities were narrowed further in FY 2006 to 3 subdisciplines based, in part, on recommendations that emerged from a stakeholder workshop conducted by Cooperative State Research, Education, and Extension Service in August 2004. In FY 2003, Congress authorized expenditure of up to 20% of the funds appropriated to the NRI to support projects that integrate at least 2 of the 3 functions of research, education, and extension. In FY 2004, the Animal Reproduction Program included a funding priority for integrated projects focused primarily on infertility in dairy cattle. The program funded its first integrated project in FY 2005. During FY 2002, increased emphasis on justification for the use of model systems (e.g., laboratory animals and in vitro systems) was included in the NRI request for applications. In FY 2006, applications proposing to primarily utilize nonagricultural animal models were excluded from the program. Currently, all proposed studies must be thoroughly justified in terms of their relevance to US animal agriculture and to program priorities identified within the request for applications.

  15. Defining priorities for improving end-of-life care in Canada

    PubMed Central

    Heyland, Daren K.; Cook, Deborah J.; Rocker, Graeme M.; Dodek, Peter M.; Kutsogiannis, Demetrios J.; Skrobik, Yoanna; Jiang, Xuran; Day, Andrew G.; Cohen, S. Robin

    2010-01-01

    Background High-quality end-of-life care should be the right of every Canadian. The objective of this study was to identify aspects of end-of-life care that are high in priority as targets for improvement using feedback elicited from patients and their families. Methods We conducted a multicentre, cross-sectional survey involving patients with advanced, life-limiting illnesses and their family caregivers. We administered the Canadian Health Care Evaluation Project (CANHELP) questionnaire along with a global rating question to measure satisfaction with end-of-life care. We derived the relative importance of individual questions on the CANHELP questionnaire from their association with a global rating of satisfaction, as determined using Pearson correlation coefficients. To determine high-priority issues, we identified questions that had scores indicating high importance and low satisfaction. Results We approached 471 patients and 255 family members, of whom 363 patients and 193 family members participated, with response rates of 77% for patients and 76% for families. From the perspective of patients, high-priority areas needing improvement were related to feelings of peace, to assessment and treatment of emotional problems, to physician availability and to satisfaction that the physician took a personal interest in them, communicated clearly and consistently, and listened. From the perspective of family members, similar areas were identified as high in priority, along with the additional areas of timely information about the patient’s condition and discussions with the doctor about final location of care and use of end-of-life technology. Interpretation End-of-life care in Canada may be improved for patients and their families by providing better psychological and spiritual support, better planning of care and enhanced relationships with physicians, especially in aspects related to communication and decision-making. PMID:20921249

  16. Ethical Challenges in the Provision of Dialysis in Resource-Constrained Environments.

    PubMed

    Luyckx, Valerie A; Miljeteig, Ingrid; Ejigu, Addisu M; Moosa, M Rafique

    2017-05-01

    The number of patients requiring dialysis by 2030 is projected to double worldwide, with the largest increase expected in low- and middle-income countries (LMICs). Dialysis is seldom considered a high priority by health care funders, consequently, few LMICs develop policies regarding dialysis allocation. Dialysis facilities may exist, but access remains highly inequitable in LMICs. High out-of-pocket payments make dialysis unsustainable and plunge many families into poverty. Patients, families, and clinicians suffer significant emotional and moral distress from daily life-and-death decisions imposed by dialysis. The health system's obligation to provide financial risk protection is an important component of global and national strategies to achieve universal health coverage. An ethical imperative therefore exists to develop transparent dialysis priority-setting guidelines to facilitate public understanding and acceptance of the realistic limits within the health system, and facilitate fair allocation of scarce resources. In this article, we present ethical challenges faced by patients, families, clinicians, and policy makers where dialysis is not universally accessible and discuss the potential ethical consequences of various dialysis allocation strategies. Finally, we suggest an ethical framework for use in policy development for priority setting of dialysis care. The accountability for reasonableness framework is proposed as a procedurally fair decision-making, priority-setting process. Copyright © 2017 Elsevier Inc. All rights reserved.

  17. Agile data management for curation of genomes to watershed datasets

    NASA Astrophysics Data System (ADS)

    Varadharajan, C.; Agarwal, D.; Faybishenko, B.; Versteeg, R.

    2015-12-01

    A software platform is being developed for data management and assimilation [DMA] as part of the U.S. Department of Energy's Genomes to Watershed Sustainable Systems Science Focus Area 2.0. The DMA components and capabilities are driven by the project science priorities and the development is based on agile development techniques. The goal of the DMA software platform is to enable users to integrate and synthesize diverse and disparate field, laboratory, and simulation datasets, including geological, geochemical, geophysical, microbiological, hydrological, and meteorological data across a range of spatial and temporal scales. The DMA objectives are (a) developing an integrated interface to the datasets, (b) storing field monitoring data, laboratory analytical results of water and sediments samples collected into a database, (c) providing automated QA/QC analysis of data and (d) working with data providers to modify high-priority field and laboratory data collection and reporting procedures as needed. The first three objectives are driven by user needs, while the last objective is driven by data management needs. The project needs and priorities are reassessed regularly with the users. After each user session we identify development priorities to match the identified user priorities. For instance, data QA/QC and collection activities have focused on the data and products needed for on-going scientific analyses (e.g. water level and geochemistry). We have also developed, tested and released a broker and portal that integrates diverse datasets from two different databases used for curation of project data. The development of the user interface was based on a user-centered design process involving several user interviews and constant interaction with data providers. The initial version focuses on the most requested feature - i.e. finding the data needed for analyses through an intuitive interface. Once the data is found, the user can immediately plot and download data through the portal. The resulting product has an interface that is more intuitive and presents the highest priority datasets that are needed by the users. Our agile approach has enabled us to build a system that is keeping pace with the science needs while utilizing limited resources.

  18. Developing a Framework and Priorities to Promote Mobility among Older Adults

    ERIC Educational Resources Information Center

    Anderson, Lynda A.; Slonim, Amy; Yen, Irene H.; Jones, Dina L.; Allen, Peg; Hunter, Rebecca H.; Goins, R. Turner; Leith, Katherine H.; Rosenberg, Dori; Satariano, William A.; McPhillips-Tangum, Carol

    2014-01-01

    Mobility, broadly defined as movement in all of its forms from ambulation to transportation, is critical to supporting optimal aging. This article describes two projects to develop a framework and a set of priority actions designed to promote mobility among community-dwelling older adults. Project 1 involved a concept-mapping process to solicit…

  19. 76 FR 19063 - Applications for New Awards; Educational Opportunity Centers (EOC) Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-06

    ... application meets this priority. This priority is: Projects that are designed to address the needs of military... other community resources in order to carry out projects that are cost-effective and best meet the needs....23). 3. Special Conditions: Under 34 CFR 74.14 and 80.12, the Secretary may impose special conditions...

  20. 76 FR 37341 - Final Priority; Rehabilitation Research and Training Center-Interventions To Promote Community...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-27

    ... research, demonstration projects, training, and related activities, to develop methods, procedures, and... DEPARTMENT OF EDUCATION [CFDA Number: 84.133B-1] Final Priority; Rehabilitation Research and... priority for a Rehabilitation Research and Training Center (RRTC) on Interventions to Promote Community...

  1. Vision and Voyages: Lessons Learned from the Planetary Decadal Survey

    NASA Astrophysics Data System (ADS)

    Squyres, S. W.

    2015-12-01

    The most recent planetary decadal survey, entitled Vision and Voyages for Planetary Science in the Decade 2013-2022, provided a detailed set of priorities for solar system exploration. Those priorities drew on broad input from the U.S. and international planetary science community. Using white papers, town hall meetings, and open meetings of the decadal committees, community views were solicited and a consensus began to emerge. The final report summarized that consensus. Like many past decadal reports, the centerpiece of Vision and Voyages was a set of priorities for future space flight projects. Two things distinguished this report from some previous decadals. First, conservative and independent cost estimates were obtained for all of the projects that were considered. These independent cost estimates, rather than estimates generated by project advocates, were used to judge each project's expected science return per dollar. Second, rather than simply accepting NASA's ten-year projection of expected funding for planetary exploration, decision rules were provided to guide program adjustments if actual funding did not follow projections. To date, NASA has closely followed decadal recommendations. In particular, the two highest priority "flagship" missions, a Mars rover to collect samples for return to Earth and a mission to investigate a possible ocean on Europa, are both underway. The talk will describe the planetary decadal process in detail, and provide a more comprehensive assessment of NASA's response to it.

  2. Occupational health research priorities in Malaysia: a Delphi study.

    PubMed

    Sadhra, S; Beach, J R; Aw, T C; Sheikh-Ahmed, K

    2001-07-01

    As part of a consultancy project on occupational health, the Delphi method was used to identify research priorities in occupational health in Malaysia. Participation was sought from government ministries, industry, and professional organisations, and university departments with an interest in occupational and public health. Two rounds of questionnaires resulted in a final list of priorities, with noticeable differences between participants depending on whether they worked in industry or were from government organisations. The participation rate of 71% (55 of 78) was obtained for the first questionnaire and 76% (72 of 95) for the second questionnaire. The participants identified occupational health problems for specific groups and industries as the top research priority area (ranked as top priority by 25% of participants). Ministry of Health participants placed emphasis on healthcare workers (52% ranking it as top priority), whereas those from industry identified construction and plantation workers as groups, which should be accorded the highest priority. Evaluation of research and services was given a low priority. The priorities for occupational health determined with the Delphi approach showed differences between Malaysia, a developing country, and findings from similar European studies. This may be expected, as differences exist in stages of economic development, types of industries, occupational activities, and cultural attitudes to occupational health and safety. Chemical poisonings and workplace accidents were accorded a high priority. By contrast with findings from western countries, workplace psychosocial problems and musculoskeletal injuries were deemed less important. There also seemed to be greater emphasis on adopting interventions for identified problems based on experience in other countries rather than the need to evaluate local occupational health provisions.

  3. Performance-based workload assessment: Allocation strategy and added task sensitivity

    NASA Technical Reports Server (NTRS)

    Vidulich, Michael A.

    1990-01-01

    The preliminary results of a research program investigating the use of added tasks to evaluate mental workload are reviewed. The focus of the first studies was a reappraisal of the traditional secondary task logic that encouraged the use of low-priority instructions for the added task. It was believed that such low-priority tasks would encourage subjects to split their available resources among the two tasks. The primary task would be assigned all the resources it needed, and any remaining reserve capacity would be assigned to the secondary task. If the model were correct, this approach was expected to combine sensitivity to primary task difficulty with unintrusiveness to primary task performance. The first studies of the current project demonstrated that a high-priority added task, although intrusive, could be more sensitive than the traditional low-priority secondary task. These results suggested that a more appropriate model of the attentional effects associated with added task performance might be based on capacity switching, rather than the traditional optimal allocation model.

  4. Modernizing sports facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dustin, R.

    Modernization and renovation of sports facilities challenge the design team to balance a number of requirements: spectator and owner expectations, existing building and site conditions, architectural layouts, code and legislation issues, time constraints and budget issues. System alternatives are evaluated and selected based on the relative priorities of these requirements. These priorities are unique to each project. At Alexander Memorial Coliseum, project schedules, construction funds and facility usage became the priorities. The ACC basketball schedule and arrival of the Centennial Olympics dictated the construction schedule. Initiation and success of the project depended on the commitment of the design team tomore » meet coliseum funding levels established three years ago. Analysis of facility usage and system alternative capabilities drove the design team to select a system that met the project requirements and will maximize the benefits to the owner and spectators for many years to come.« less

  5. Noninvasive treatment efficacy monitoring and dose control for high-intensity focused ultrasound therapy using relative electrical impedance variation

    NASA Astrophysics Data System (ADS)

    Su, Huidan; Guo, Gepu; Ma, Qingyu; Tu, Juan; Zhang, Dong

    2017-05-01

    Not Available Project supported by the National Natural Science Foundation of China (Grant Nos. 11604156 and 11474166), the Science and Technology Cooperation Projects of China and Romania (Grant No. 42-23), the Natural Science Foundation of Jiangsu Province, China (Grant No. BK20161013), the Postdoctoral Science Foundation of China (Grant No. 2016M591874), and the Priority Academic Program Development of Jiangsu Higher Education Institutions, China.

  6. [Evaluation of possibility of using new financial instruments for supporting biomedical projects].

    PubMed

    Starodubov, V I; Kurakova, N G; Eremchenko, O A; Tsvetkova, L A; Zinov, V G

    2014-01-01

    Analysis of selection criteria on projects of Russian medical research centers for funding in Russian scientific fund and Federal program "Research and innovations" was done. It was noted that a high degree of uncertainty of such concepts as "priority direction", "applied" and "search" research and "industrial partner" in regards to research of biomedical theme. Analysis of classified "Medicine and health care" "Forecast of scientific-technological development of Russian Federation till 2030 year" were completed.

  7. 75 FR 73050 - Office of Elementary and Secondary Education Overview Information; College Assistance Migrant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... priority is an invitational priority for applications that promote science, technology, engineering, and... Priority 1--Science, Technology, Engineering and Mathematics (STEM) Education: Projects that are designed... prepared for postsecondary or graduate study and careers in STEM, with a specific focus on an increase in...

  8. 40 CFR 35.2024 - Combined sewer overflows.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... project priority list, it addresses impaired uses in priority water quality areas which are due to the... must demonstrate to the Administrator that the water quality goals of the Act will not be achieved... priority water quality areas in marine bays and estuaries due to the impacts of combined sewer overflows...

  9. 78 FR 2919 - Proposed Priority-National Institute on Disability and Rehabilitation Research-Disability and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-15

    ... Rehabilitation Research--Disability and Rehabilitation Research Project--Inclusive Cloud and Web Computing CFDA... inclusive Cloud and Web computing. The Assistant Secretary may use this priority for competitions in fiscal... Priority for Inclusive Cloud and Web Computing'' in the subject line of your electronic message. FOR...

  10. Occupational health research priorities in Malaysia: a Delphi study

    PubMed Central

    Sadhra, S; Beach, J; Aw, T; Sheikh-Ahmed, K

    2001-01-01

    OBJECTIVES—As part of a consultancy project on occupational health, the Delphi method was used to identify research priorities in occupational health in Malaysia.
METHODS—Participation was sought from government ministries, industry, and professional organisations, and university departments with an interest in occupational and public health. Two rounds of questionnaires resulted in a final list of priorities, with noticeable differences between participants depending on whether they worked in industry or were from government organisations.
RESULTS—The participation rate of 71% (55 of 78) was obtained for the first questionnaire and 76% (72 of 95) for the second questionnaire. The participants identified occupational health problems for specific groups and industries as the top research priority area (ranked as top priority by 25% of participants). Ministry of Health participants placed emphasis on healthcare workers (52% ranking it as top priority), whereas those from industry identified construction and plantation workers as groups, which should be accorded the highest priority. Evaluation of research and services was given a low priority.
CONCLUSIONS—The priorities for occupational health determined with the Delphi approach showed differences between Malaysia, a developing country, and findings from similar European studies. This may be expected, as differences exist in stages of economic development, types of industries, occupational activities, and cultural attitudes to occupational health and safety. Chemical poisonings and workplace accidents were accorded a high priority. By contrast with findings from western countries, workplace psychosocial problems and musculoskeletal injuries were deemed less important. There also seemed to be greater emphasis on adopting interventions for identified problems based on experience in other countries rather than the need to evaluate local occupational health provisions.


Keywords: occupational health; research priorities; Malaysia PMID:11404445

  11. Developing risk-based priorities for reducing air pollution in urban settings in Ukraine.

    PubMed

    Brody, Michael; Caldwell, Jane; Golub, Alexander

    2007-02-01

    Ukraine, when part of the former Soviet Union, was responsible for about 25% of its overall industrial production. This aging industrial infrastructure continues to emit enormous volumes of air and water pollution and wastes. The National Report on the State of Environment in Ukraine 1999 (Ukraine Ministry of Environmental Protection [MEP], 2000) shows significant air pollution. There are numerous emissions that have been associated with developmental effects, chronic long-term health effects, and cancer. Ukraine also has been identified as a major source of transboundary air pollution for the eastern Mediterranean region. Ukraine's Environment Ministry is not currently able to strategically target high-priority emissions and lacks the resources to address all these problems. For these reasons, the U.S. Environmental Protection Agency set up a partnership with Ukraine's Ministry of Environmental Protection to strengthen its capacity to set environmental priorities through the use of comparative environmental risk assessment and economic analysis--the Capacity Building Project. The project is also addressing improvements in the efficiency and effectiveness of the use of its National Environmental Protection Fund. The project consists of a series of workshops with Ukrainian MEP officials in comparative risk assessment of air pollutant emissions in several heavily industrialized oblasts; cost-benefit and cost-effectiveness analysis; and environmental finance. Pilot risk assessment analyses have been completed. At the end of the Capacity Building Project it is expected that the use of the National Environmental Protection fund and the regional level oblast environmental protection funds will begin to target and identify the highest health and environmental risk emissions.

  12. 40 CFR 35.2015 - State priority system and project priority list.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... I); (B) Treatment more stringent than secondary (category II); (C) Infiltration/inflow correction... cost-effective alternative; (C) New interceptors and appurtenances; and (D) Infiltration/inflow...

  13. 40 CFR 35.2015 - State priority system and project priority list.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... I); (B) Treatment more stringent than secondary (category II); (C) Infiltration/inflow correction... cost-effective alternative; (C) New interceptors and appurtenances; and (D) Infiltration/inflow...

  14. 40 CFR 35.2015 - State priority system and project priority list.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... I); (B) Treatment more stringent than secondary (category II); (C) Infiltration/inflow correction... cost-effective alternative; (C) New interceptors and appurtenances; and (D) Infiltration/inflow...

  15. 40 CFR 35.2015 - State priority system and project priority list.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... I); (B) Treatment more stringent than secondary (category II); (C) Infiltration/inflow correction... cost-effective alternative; (C) New interceptors and appurtenances; and (D) Infiltration/inflow...

  16. University of Nevada System Planning Report: 1987-1991. Future Directions for Nevada's Colleges and Universities.

    ERIC Educational Resources Information Center

    Nevada Univ. System, Reno.

    Goals and priorities of the University of Nevada System for 1987-1991 are presented, with attention to growth projections, campus academic and budget priorities, capital construction needs, economic development, strengthening higher education in the state, and data collection. In addition to the System's goals, academic priorities are described…

  17. 76 FR 39615 - Applications for New Awards; Promise Neighborhoods Program-Implementation Grant Competition

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-06

    ... Civil Rights Act of 1964 (prohibiting discrimination on the basis of race, color, or national origin... maximum of two of the competitive preference priorities. Therefore, an applicant must identify in the project narrative section of its application the priority or the two priorities it wishes the Department...

  18. 77 FR 23675 - Applications for New Awards; Promise Neighborhoods Program-Implementation Grant Competition

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-20

    ... discrimination on the basis of race, color, or national origin); Section 504 of the Rehabilitation Act of 1973... maximum of two of the competitive preference priorities. Therefore, an applicant must identify in the project narrative section of its application the priority or the two priorities it wishes the Department...

  19. Empowering districts to target priorities for improving child health service in Uganda using change management and rapid assessment methods.

    PubMed

    Odaga, John; Henriksson, Dorcus K; Nkolo, Charles; Tibeihaho, Hector; Musabe, Richard; Katusiime, Margaret; Sinabulya, Zaccheus; Mucunguzi, Stephen; Mbonye, Anthony K; Valadez, Joseph J

    2016-01-01

    Local health system managers in low- and middle-income countries have the responsibility to set health priorities and allocate resources accordingly. Although tools exist to aid this process, they are not widely applied for various reasons including non-availability, poor knowledge of the tools, and poor adaptability into the local context. In Uganda, delivery of basic services is devolved to the District Local Governments through the District Health Teams (DHTs). The Community and District Empowerment for Scale-up (CODES) project aims to provide a set of management tools that aid contextualised priority setting, fund allocation, and problem-solving in a systematic way to improve effective coverage and quality of child survival interventions. Although the various tools have previously been used at the national level, the project aims to combine them in an integral way for implementation at the district level. These tools include Lot Quality Assurance Sampling (LQAS) surveys to generate local evidence, Bottleneck analysis and Causal analysis as analytical tools, Continuous Quality Improvement, and Community Dialogues based on Citizen Report Cards and U reports. The tools enable identification of gaps, prioritisation of possible solutions, and allocation of resources accordingly. This paper presents some of the tools used by the project in five districts in Uganda during the proof-of-concept phase of the project. All five districts were trained and participated in LQAS surveys and readily adopted the tools for priority setting and resource allocation. All districts developed health operational work plans, which were based on the evidence and each of the districts implemented more than three of the priority activities which were included in their work plans. In the five districts, the CODES project demonstrated that DHTs can adopt and integrate these tools in the planning process by systematically identifying gaps and setting priority interventions for child survival.

  20. Empowering districts to target priorities for improving child health service in Uganda using change management and rapid assessment methods

    PubMed Central

    Odaga, John; Henriksson, Dorcus K.; Nkolo, Charles; Tibeihaho, Hector; Musabe, Richard; Katusiime, Margaret; Sinabulya, Zaccheus; Mucunguzi, Stephen; Mbonye, Anthony K.; Valadez, Joseph J.

    2016-01-01

    Background Local health system managers in low- and middle-income countries have the responsibility to set health priorities and allocate resources accordingly. Although tools exist to aid this process, they are not widely applied for various reasons including non-availability, poor knowledge of the tools, and poor adaptability into the local context. In Uganda, delivery of basic services is devolved to the District Local Governments through the District Health Teams (DHTs). The Community and District Empowerment for Scale-up (CODES) project aims to provide a set of management tools that aid contextualised priority setting, fund allocation, and problem-solving in a systematic way to improve effective coverage and quality of child survival interventions. Design Although the various tools have previously been used at the national level, the project aims to combine them in an integral way for implementation at the district level. These tools include Lot Quality Assurance Sampling (LQAS) surveys to generate local evidence, Bottleneck analysis and Causal analysis as analytical tools, Continuous Quality Improvement, and Community Dialogues based on Citizen Report Cards and U reports. The tools enable identification of gaps, prioritisation of possible solutions, and allocation of resources accordingly. This paper presents some of the tools used by the project in five districts in Uganda during the proof-of-concept phase of the project. Results All five districts were trained and participated in LQAS surveys and readily adopted the tools for priority setting and resource allocation. All districts developed health operational work plans, which were based on the evidence and each of the districts implemented more than three of the priority activities which were included in their work plans. Conclusions In the five districts, the CODES project demonstrated that DHTs can adopt and integrate these tools in the planning process by systematically identifying gaps and setting priority interventions for child survival. PMID:27225791

  1. Mechanistic models as a transferable framework for projecting effects of habitat change on production and delivery of ecosystem services

    EPA Science Inventory

    Drawing a link between habitat change and the production and delivery of ecosystem services is a priority in coastal estuarine ecosystems. Mechanistic modeling tools are highly functional for exploring this link because they allow for the synthesis of multiple ecological and beh...

  2. Identifying Research Priorities for School Improvement in the Developing World

    ERIC Educational Resources Information Center

    Read, Robyn; Fernandez-Hermosilla, Magdalena; Anderson, Stephen; Mundy, Karen

    2016-01-01

    This paper discusses a research agenda setting project conducted for an international non-governmental organization which aims to help create a regionally relevant, high-quality knowledge base on key education issues of policy and practice. Specifically, we illustrate how our team adapted the Child Health and Nutrition Research Initiative (CHRNI)…

  3. Teachers' Mindset and Responsibilities in Using Virtual Learning Environment (VLE) in Icelandic Schools

    ERIC Educational Resources Information Center

    Thorsteinsson, Gisli

    2013-01-01

    Running Information and Communication Technologies (ICT) classes using Virtual Learning Environments (VLEs) has become a high priority project for many educational institutions, as it offers opportunities for online education and support for conventional education. However, acquiring and deploying a VLE is a difficult task that concerns teachers'…

  4. School Science Inspired by Improving Weather Forecasts

    ERIC Educational Resources Information Center

    Reid, Heather; Renfrew, Ian A.; Vaughan, Geraint

    2014-01-01

    High winds and heavy rain are regular features of the British weather, and forecasting these events accurately is a major priority for the Met Office and other forecast providers. This is the challenge facing DIAMET, a project involving university groups from Manchester, Leeds, Reading, and East Anglia, together with the Met Office. DIAMET is part…

  5. An Ecologist Is Born: An Integrated Experiential Learning Activity

    ERIC Educational Resources Information Center

    Behrendt, Marc; Behrendt, Barbara

    2012-01-01

    Language arts and mathematics are high priority content areas in early grades. Science is often a secondary concern, even though students appear to have minimal knowledge or interest in their local ecology. This article describes a year-long project integrating science and technology with language arts. Students researched and wrote about local…

  6. Food, Nutrition and Development in Ecuador.

    ERIC Educational Resources Information Center

    Masse-Raimbault, Anne-Marie, Ed.

    1995-01-01

    This purpose of this journal is to document advances in the fields of health, education, food, diet, and development. Each issue contains an overview of a high-priority subject touching the everyday life of children, mothers, and families. This double issue describes the Andes project, a food, diet, nutrition, and development program conducted in…

  7. Vulnerability in Determining the Cost of Information System Project to Avoid Loses

    NASA Astrophysics Data System (ADS)

    Haryono, Kholid; Ikhsani, Zulfa Amalia

    2018-03-01

    Context: This study discusses the priority of cost required in software development projects. Objectives: To show the costing models, the variables involved, and how practitioners assess and decide the priorities of each variable. To strengthen the information, each variable also confirmed the risk if ignored. Method: The method is done by two approaches. First, systematic literature reviews to find the models and variables used to decide the cost of software development. Second, confirm and take judgments about the level of importance and risk of each variable to the software developer. Result: Obtained about 54 variables that appear on the 10 models discussed. The variables are categorized into 15 groups based on the similarity of meaning. Each group becomes a variable. Confirmation results with practitioners on the level of importance and risk. It shown there are two variables that are considered very important and high risk if ignored. That is duration and effort. Conclusion: The relationship of variable rates between the results of literature studies and confirmation of practitioners contributes to the use of software business actors in considering project cost variables.

  8. Geothermal energy: opportunities for California commerce. Phase I report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Longyear, A.B.

    1981-12-01

    The potential geothermal direct-use energy market and its application to projects in California are assessed. Project identification effort is to be focused on those that have the highest probability for near-term successful commercial operations. Near-term herein means 2 to 5 years for project implementation. Phase I has been focused on defining and assessing: (1) the geothermal direct-use resources that are suitable for near-term utilization; and (2) the generic applications (municipal heating districts, horticultural greenhouse firms, laundries, etc.) that are suitable for near-term projects. Five economic development regions in the state, containing recognized geothermal direct-use resources, have been defined. Thirty-eight directmore » use resources have been evaluated in these regions. After assessment against pre-selected criteria, twenty-seven have been rated with a priority of I, II or III, thereby qualifying them for further marketing effort. The five areas with a priority of I are summarized. These areas have no perceived impediments to near-term development. Twenty-nine generic categories of applications were assessed against previously selected criteria to determine their near term potential for direct use of geothermal fluids. Some twenty industry, commercial and institutional application categories were rated with a priority of I, II or III and warrant further marketing efforts. The seven categories with a priority of I are listed. These categories were found to have the least impediments to near-term application projects.« less

  9. Transit signal priority research tools

    DOT National Transportation Integrated Search

    2008-05-01

    This report presents the results of a research project that addresses Transit Signal Priority (TSP) deployment issues. The report reviews National Transportation Communications for ITS Protocol (NTCIP) 1211 Signal Control and Prioritization (SCP) sta...

  10. Learning Spaces as a Strategic Priority

    ERIC Educational Resources Information Center

    George, Gene; Erwin, Tom; Barnes, Briony

    2009-01-01

    In April 2007 Butler Community College made learning spaces one of its five strategic priorities. The college had just completed a major renovation of the work spaces for the IT division and had started a project to build a student union and create informal learning spaces at the Andover campus. With learning spaces becoming a strategic priority,…

  11. Optimized Enhanced Bioremediation Through 4D Geophysical Monitoring and Autonomous Data Collection, Processing and Analysis

    DTIC Science & Technology

    2014-09-01

    High Fructose Corn Syrup Diluted 1 to 10 percent by weight 50 to 500 mg/l Slow Release Whey (fresh/powered) Dissolved (powdered form) or injected...the assessment of remedial progress and functioning. This project also addressed several high priority needs from the Navy Environmental Quality...memory high -performance computing systems. For instance, as of March 2012 the code has been successfully executed on 2 cpu’s for an inversion problem

  12. [The Danish Debate on Priority Setting in Medicine--An Update].

    PubMed

    Pornak, S C; Raspe, H

    2015-09-01

    In the last years, the Danish debate about priority setting in medicine has gained new strength. This paper shows the main focuses of the current discussion based on a research of Danish primary literature. For the first time since the 1990s the Danish Council of Ethics has been involved with priority setting in medicine in a project running from 2011 to 2013. The Council emphasises the importance of legitimate processes and calls for visible values and criteria. A focus of the debate is how to deal with new expensive drugs. Politicians, physicians, health economists and the Council of Ethics have called for a national institution for priority setting in medicine. They have mainly looked to the Norwegian National Council for Priority Setting in Health Care and the British National Institute for Health and Care Excellence for inspiration. The Danish Government considered establishing a national institute for priority setting, but the plans were not put into practice. In the year 2012 a new national project was launched to create clinical guidelines. Danish doctors welcome the guidelines as a good basis for priority setting. Just like in earlier Danish priority setting debates, a coordinating institution is lacking to bundle the discussion and keep it going. The debate seems to have come to an end once again. The fact that it was seriously considered to establish an institute for priority setting is a new development. It can be expected that the discussion will be resumed in the near future, possibly the idea of an institute for priority setting will be readopted. The general conditions for priority setting in health care have improved. © Georg Thieme Verlag KG Stuttgart · New York.

  13. Using the Nine Common Themes of Good Practice checklist as a tool for evaluating the research priority setting process of a provincial research and program evaluation program.

    PubMed

    Mador, Rebecca L; Kornas, Kathy; Simard, Anne; Haroun, Vinita

    2016-03-23

    Given the context-specific nature of health research prioritization and the obligation to effectively allocate resources to initiatives that will achieve the greatest impact, evaluation of priority setting processes can refine and strengthen such exercises and their outcomes. However, guidance is needed on evaluation tools that can be applied to research priority setting. This paper describes the adaption and application of a conceptual framework to evaluate a research priority setting exercise operating within the public health sector in Ontario, Canada. The Nine Common Themes of Good Practice checklist, described by Viergever et al. (Health Res Policy Syst 8:36, 2010) was used as the conceptual framework to evaluate the research priority setting process developed for the Locally Driven Collaborative Projects (LDCP) program in Ontario, Canada. Multiple data sources were used to inform the evaluation, including a review of selected priority setting approaches, surveys with priority setting participants, document review, and consultation with the program advisory committee. The evaluation assisted in identifying improvements to six elements of the LDCP priority setting process. The modifications were aimed at improving inclusiveness, information gathering practices, planning for project implementation, and evaluation. In addition, the findings identified that the timing of priority setting activities and level of control over the process were key factors that influenced the ability to effectively implement changes. The findings demonstrate the novel adaptation and application of the 'Nine Common Themes of Good Practice checklist' as a tool for evaluating a research priority setting exercise. The tool can guide the development of evaluation questions and enables the assessment of key constructs related to the design and delivery of a research priority setting process.

  14. Development of a new model to engage patients and clinicians in setting research priorities.

    PubMed

    Pollock, Alex; St George, Bridget; Fenton, Mark; Crowe, Sally; Firkins, Lester

    2014-01-01

    Equitable involvement of patients and clinicians in setting research and funding priorities is ethically desirable and can improve the quality, relevance and implementation of research. Survey methods used in previous priority setting projects to gather treatment uncertainties may not be sufficient to facilitate responses from patients and their lay carers for some health care topics. We aimed to develop a new model to engage patients and clinicians in setting research priorities relating to life after stroke, and to explore the use of this model within a James Lind Alliance (JLA) priority setting project. We developed a model to facilitate involvement through targeted engagement and assisted involvement (FREE TEA model). We implemented both standard surveys and the FREE TEA model to gather research priorities (treatment uncertainties) from people affected by stroke living in Scotland. We explored and configured the number of treatment uncertainties elicited from different groups by the two approaches. We gathered 516 treatment uncertainties from stroke survivors, carers and health professionals. We achieved approximately equal numbers of contributions; 281 (54%) from stroke survivors/carers; 235 (46%) from health professionals. For stroke survivors and carers, 98 (35%) treatment uncertainties were elicited from the standard survey and 183 (65%) at FREE TEA face-to-face visits. This contrasted with the health professionals for whom 198 (84%) were elicited from the standard survey and only 37 (16%) from FREE TEA visits. The FREE TEA model has implications for future priority setting projects and user-involvement relating to populations of people with complex health needs. Our results imply that reliance on standard surveys may result in poor and unrepresentative involvement of patients, thereby favouring the views of health professionals.

  15. Education and Zambia's Democratic Development: Reconstituting "Something" from the Predatory Project of Neoliberal Globalization

    ERIC Educational Resources Information Center

    Abdi, Ali A.; Ellis, Lee

    2007-01-01

    Zambia, a central African country of about 10 million people, is currently exposed to the nonsubjective forces of globalization, including institutional weaknesses such as high unemployment rated and chronic levels of poverty that ipso facto problematize its governance and social development priorities. The first part of the article focuses on an…

  16. Watershed prioritization in the upper Han River basin for soil and water conservation in the South-to-North Water Transfer Project (middle route) of China.

    PubMed

    Wu, Haibing

    2018-01-01

    Watershed prioritization with the objective of identifying critical areas to undertake soil and water conservation measures was conducted in the upper Han River basin, the water source area of approximately 95,000 km 2 for the middle route of China's South-to-North Water Transfer Project. Based on the estimated soil erosion intensity in uplands and clustering analysis of measured nutrient concentrations in rivers, the basin was grouped into very-high-, high-, moderate-, and low-priority regions for water and soil conservation, respectively. The results indicated that soil erosion was primarily controlled by topography, and nutrients in rivers were associated with land use and land cover in uplands. Also, there was large spatial disparity between soil erosion intensity in the uplands and nutrient concentrations in the rivers across the basin. Analysis was then performed to prioritize the basin by the integration of the soil erosion intensity and water quality on a GIS platform in order to identify critical areas for water and soil conservation in the basin. The identified high-priority regions which occupy 5.74% of the drainage areas need immediate attention for soil and water conservation treatments, of which 5.28% is critical for soil erosion prevention and 0.46% for water conservation. Understandings of the basin environment and pollutant loading with spatial explicit are critical to the soil and water resource conservation for the interbasin water transfer project.

  17. Using Baltimore HIV behavioral surveillance data for local HIV prevention planning.

    PubMed

    German, Danielle; Linton, Sabriya; Cassidy-Stewart, Hope; Flynn, Colin

    2014-04-01

    In response to the National HIV/AIDS Strategy (NHAS) and as part of CDC's Enhanced Comprehensive HIV Prevention Plan (ECHPP) project, Maryland developed a comprehensive local HIV prevention plan for the Baltimore-Towson Metropolitan Statistical Area and identified a series of priority HIV prevention and service goals. The current project sought to: (1) determine how well National HIV Behavioral Surveillance (NHBS) indicators were aligned with NHAS/ECHPP-informed local HIV prevention goals (2) facilitate on-going NHBS data utilization to inform on-going local HIV prevention and service planning, and (3) build a foundation for future NHBS data utilization in local HIV decision-making. Project activities identified key HIV-related indicators in NHBS that are directly or indirectly related to local HIV priorities as informed by NHAS/ECHPP, which can be used for HIV prevention planning in the Baltimore area. Areas for enhancing NHBS and local data collection to further inform HIV prevention priorities are highlighted.

  18. Identifying priorities for improving rear seat occupant protection.

    DOT National Transportation Integrated Search

    2009-03-01

    This project helped to identify priorities for improving the safety of rear seat occupants through a literature review and NASS-CDS injury analysis. The literature review covers injury patterns of rear seat occupants, new safety technologies intended...

  19. NASA Human Health and Performance Center (NHHPC)

    NASA Technical Reports Server (NTRS)

    Davis, J. R.; Richard, E. E.

    2010-01-01

    The NASA Human Health and Performance Center (NHHPC) will provide a collaborative and virtual forum to integrate all disciplines of the human system to address spaceflight, aviation, and terrestrial human health and performance topics and issues. The NHHPC will serve a vital role as integrator, convening members to share information and capture a diverse knowledge base, while allowing the parties to collaborate to address the most important human health and performance topics of interest to members. The Center and its member organizations will address high-priority risk reduction strategies, including research and technology development, improved medical and environmental health diagnostics and therapeutics, and state-of-the art design approaches for human factors and habitability. Once full established in 2011, the NHHPC will focus on a number of collaborative projects focused on human health and performance, including workshops, education and outreach, information sharing and knowledge management, and research and technology development projects, to advance the study of the human system for spaceflight and other national and international priorities.

  20. ISO Key Project: Exploring the Full Range of Quasar/AGN Properties

    NASA Technical Reports Server (NTRS)

    Wilkes, Belinda J.

    1997-01-01

    The ISOPHOT team have developed new recommendations for observing faint sources with ISHPOHT which involve small rasters rather than chopping. This was finalized around Feb 1997 and following this we re-designed the observations for the remainder of our observing time. We had put our program on hold in September when it became clear that chopped observations had major problems. The revised program, which included re-observation at long wavelengths using rasters for a number of high-priority targets and re-specification of new observations of others, was released in April 1997. The latest prediction for the satellite lifetime has extended its life until April 1998. Our project has been allocated a 15% increase in our observing time as a result of this life extension. We are currently working on setting priorities in order to determine which targets to include in this additional time. This will help to offset some of the targets lost due to the significant decrease in detector sensitivity over pre-flight predictions.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    ?Ducts in conditioned space (DCS) represent a high priority measure for moving the next generation of new homes to the Zero Net Energy performance level. Various strategies exist for incorporating ducts within the conditioned thermal envelope. To support this activity, in 2013 the Pacific Gas & Electric Company initiated a project with Davis Energy Group (lead for the Building America team, Alliance for Residential Building Innovation) to solicit builder involvement in California to participate in field demonstrations of various DCS strategies. Builders were given incentives and design support in exchange for providing site access for construction observation, diagnostic testing, andmore » builder survey feedback. Information from the project was designed to feed into California's 2016 Title 24 process, but also to serve as an initial mechanism to engage builders in more high performance construction strategies. This Building America project complemented information collected in the California project with BEopt simulations of DCS performance in hot/dry climate regions.« less

  2. 76 FR 33734 - Applications for New Awards; Spinal Cord Injury Model Systems (SCIMS) Centers and SCIMS Multi...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-09

    ... Institute on Disability and Rehabilitation Research (NIDRR)-- Disability and Rehabilitation Research Projects and Centers Program-- Disability and Rehabilitation Research Projects (DRRPs) and Special Projects... Research Projects. General Disability and Rehabilitation Research Projects (DRRP) Requirements priority...

  3. Ranking the Project Management Success Factors for Construction Project in South India

    NASA Astrophysics Data System (ADS)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  4. Software engineering processes for Class D missions

    NASA Astrophysics Data System (ADS)

    Killough, Ronnie; Rose, Debi

    2013-09-01

    Software engineering processes are often seen as anathemas; thoughts of CMMI key process areas and NPR 7150.2A compliance matrices can motivate a software developer to consider other career fields. However, with adequate definition, common-sense application, and an appropriate level of built-in flexibility, software engineering processes provide a critical framework in which to conduct a successful software development project. One problem is that current models seem to be built around an underlying assumption of "bigness," and assume that all elements of the process are applicable to all software projects regardless of size and tolerance for risk. This is best illustrated in NASA's NPR 7150.2A in which, aside from some special provisions for manned missions, the software processes are to be applied based solely on the criticality of the software to the mission, completely agnostic of the mission class itself. That is, the processes applicable to a Class A mission (high priority, very low risk tolerance, very high national significance) are precisely the same as those applicable to a Class D mission (low priority, high risk tolerance, low national significance). This paper will propose changes to NPR 7150.2A, taking mission class into consideration, and discuss how some of these changes are being piloted for a current Class D mission—the Cyclone Global Navigation Satellite System (CYGNSS).

  5. Technology Solutions Case Study: High-Performance Ducts in Hot-Dry Climates

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    M. Hoeschele, A. German, E. Weitzel, R. Chitwood

    2015-08-01

    Ducts in conditioned space (DCS) represent a high priority measure for moving the next generation of new homes to the Zero Net Energy performance level. Various strategies exist for incorporating ducts within the conditioned thermal envelope. To support this activity, in 2013 the Pacific Gas & Electric Company initiated a project with Davis Energy Group (lead for the Building America team, Alliance for Residential Building Innovation) to solicit builder involvement in California to participate in field demonstrations of various DCS strategies. Builders were given incentives and design support in exchange for providing site access for construction observation, diagnostic testing, andmore » builder survey feedback. Information from the project was designed to feed into California's 2016 Title 24 process, but also to serve as an initial mechanism to engage builders in more high performance construction strategies. This Building America project complemented information collected in the California project with BEopt simulations of DCS performance in hot/dry climate regions.« less

  6. The method of selecting an integrated development territory for the high-rise unique constructions

    NASA Astrophysics Data System (ADS)

    Sheina, Svetlana; Shevtsova, Elina; Sukhinin, Alexander; Priss, Elena

    2018-03-01

    On the basis of data provided by the Department of architecture and urban planning of the city of Rostov-on-don, the problem of the choice of the territory for complex development that will be in priority for the construction of high-rise and unique buildings is solved. The objective of the study was the development of a methodology for selection of the area and the implementation of the proposed method on the example of evaluation of four-territories complex development. The developed method along with standard indicators of complex evaluation considers additional indicators that assess the territory from the position of high-rise unique building. The final result of the study is the rankings of the functional priority areas that takes into account the construction of both residential and public and business objects of unique high-rise construction. The use of the developed methodology will allow investors and customers to assess the investment attractiveness of the future unique construction project on the proposed site.

  7. Nurturing Creativity and Innovation through FabKids: A Case Study

    ERIC Educational Resources Information Center

    Beyers, Ronald Noel

    2010-01-01

    This paper will report on a case study that was conducted involving Grade 10 learners who were exposed to a high-tech rapid-prototyping environment of a Fabrication Laboratory as part of a FabKids experience. This project must be viewed in the context of a global shortage of key skills placing a higher priority on the initiation and development of…

  8. Resource allocation in road infrastructure using ANP priorities with ZOGP formulation-A case study

    NASA Astrophysics Data System (ADS)

    Alias, Suriana; Adna, Norfarziah; Soid, Siti Khuzaimah; Kardri, Mahani

    2013-09-01

    Road Infrastructure (RI) project evaluation and selection is concern with the allocation of scarce organizational resources. In this paper, it is suggest an improved RI project selection methodology which reflects interdependencies among evaluation criteria and candidate projects. Fuzzy Delphi Method (FDM) is use to evoking expert group opinion and also to determine a degree of interdependences relationship between the alternative projects. In order to provide a systematic approach to set priorities among multi-criteria and trade-off among objectives, Analytic Network Process (ANP) is suggested to be applied prior to Zero-One Goal Programming (ZOGP) formulation. Specifically, this paper demonstrated how to combined FDM and ANP with ZOGP through a real-world RI empirical example on an ongoing decision-making project in Johor, Malaysia.

  9. Notification: Cancellation of Assignment on Proposed Superfund Sites on the U.S. EPA's National Priorities List

    EPA Pesticide Factsheets

    Project #OPE-FY13-0018, July 30, 2013. The Office of Inspector General conducted preliminary research to evaluate proposed Superfund sites on the U.S. Environmental Protection Agency’s National Priorities List.

  10. Method ranks competing projects by priorities, risk. [A method to help prioritize oil and gas pipeline project goals

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moeckel, D.R.

    A practical, objective guide for ranking projects based on risk-based priorities has been developed by Sun Pipe Line Co. The deliberately simple system guides decisions on how to allocate scarce company resources because all managers employ the same criteria in weighing potential risks to the company versus benefits. Managers at all levels are continuously having to comply with an ever growing amount of legislative and regulatory requirements while at the same time trying to run their businesses effectively. The system primarily is designed for use as a compliance oversight and tracking process to document, categorize, and follow-up on work concerningmore » various issues or projects. That is, the system consists of an electronic database which is updated periodically, and is used by various levels of management to monitor progress of health, safety, environmental and compliance-related projects. Criteria used in determining a risk factor and assigning a priority also have been adapted and found useful for evaluating other types of projects. The process enables management to better define potential risks and/or loss of benefits that are being accepted when a project is rejected from an immediate work plan or budget. In times of financial austerity, it is extremely important that the right decisions are made at the right time.« less

  11. Final priority; National Institute on Disability and Rehabilitation Research--Rehabilitation Engineering Research Centers. Final priority.

    PubMed

    2014-06-05

    The Assistant Secretary for Special Education and Rehabilitative Services announces a priority for the Disability and Rehabilitation Research Projects and Centers Program administered by the National Institute on Disability and Rehabilitation Research (NIDRR). Specifically, we announce a priority for a Rehabilitation Engineering Research Center (RERC) on Technologies to Enhance Independence in Daily Living for Adults with Cognitive Impairments. The Assistant Secretary may use this priority for competitions in fiscal year (FY) 2014 and later years. We take this action to focus research attention on an area of national need. We intend the priority to contribute to improved outcomes related to independence in daily activities in the home, community, or workplace setting for adults with cognitive impairments.

  12. Final priority; National Institute on Disability and Rehabilitation Research--Rehabilitation Engineering Research Centers. Final priority.

    PubMed

    2014-07-09

    The Assistant Secretary for Special Education and Rehabilitative Services announces a priority under the Disability and Rehabilitation Research Projects and Centers Program administered by the National Institute on Disability and Rehabilitation Research (NIDRR). Specifically, we announce a priority for a Rehabilitation Engineering Research Center (RERC) on Improving the Accessibility, Usability, and Performance of Technology for Individuals who are Deaf or Hard of Hearing. The Assistant Secretary may use this priority for competitions in fiscal year (FY) 2014 and later years. We take this action to focus research attention on an area of national need. We intend the priority to contribute to improving the accessibility, usability, and performance of technology for individuals who are deaf or hard of hearing.

  13. [Swiss research agenda for gerontological nursing].

    PubMed

    Imhof, Lorenz; Naef, Rahel; Mahrer-Imhof, Romy

    2008-12-01

    In Switzerland life expectancy is currently 84 years in women and 79 years in men. By 2030 the number of people over 80 will increase by 83% to 625 000. The need of nursing care in this population is expected to double. In order to ensure high quality care, scientific knowledge generated by nursing research is, therefore, pivotal. Within the framework of a national project, a nursing research agenda has been formulated based on a literature review, expert panels, a national survey, and a consensus conference; seven priorities for clinical nursing research for the years 2007-2017 have been developed. In the field of gerontological nursing twenty-one research priorities have been identified. They include among others interventions to support independent living and autonomy at home or the impact of new technology on nursing care of the elderly. Support for caregivers and the health of caregivers of patients with dementia have to be addressed as well as interventions for specific challenges in the elderly such as fall prevention, delirium, malnutrition, and depression. Pivotal questions in nursing research are concerned with the continuity of nursing care that exceeds institutional and professional boundaries. Moreover, it is recommended that research projects address the impact of political decisions on nursing care and provide knowledge to improve quality in nursing homes and community health care. With this article the first research agenda for gerontological nursing is presented, that is based on the seven priorities of the Swiss Research Agenda for Nursing-SRAN and in turn can be used as a basis for strategic discussion, action plans, and research projects.

  14. Priority regions for research on dryland cereals and legumes

    PubMed Central

    Hyman, Glenn; Barona, Elizabeth; Biradar, Chandrashekhar; Guevara, Edward; Dixon, John; Beebe, Steve; Castano, Silvia Elena; Alabi, Tunrayo; Gumma, Murali Krishna; Sivasankar, Shoba; Rivera, Ovidio; Espinosa, Herlin; Cardona, Jorge

    2016-01-01

    Dryland cereals and legumes  are important crops in farming systems across the world.  Yet they are frequently neglected among the priorities for international agricultural research and development, often due to lack of information on their magnitude and extent. Given what we know about the global distribution of dryland cereals and legumes, what regions should be high priority for research and development to improve livelihoods and food security? This research evaluated the geographic dimensions of these crops and the farming systems where they are found worldwide. The study employed geographic information science and data to assess the key farming systems and regions for these crops. Dryland cereal and legume crops should be given high priority in 18 farming systems worldwide, where their cultivated area comprises more than 160 million ha. These regions include the dryer areas of South Asia, West and East Africa, the Middle East and North Africa, Central America and other parts of Asia. These regions are prone to drought and heat stress, have limiting soil constraints, make up half of the global population and account for 60 percent of the global poor and malnourished. The dryland cereal and legume crops and farming systems merit more research and development attention to improve productivity and address development problems. This project developed an open access dataset and information resource that provides the basis for future analysis of the geographic dimensions of dryland cereals and legumes. PMID:27303632

  15. Health policy and systems research agendas in developing countries.

    PubMed

    Gonzalez-Block, Miguel A

    2004-08-05

    BACKGROUND: Health policy and systems research (HPSR) is an international public good with potential to orient investments and performance at national level. Identifying research trends and priorities at international level is therefore important. This paper offers a conceptual framework and defines the HPSR portfolio as a set of research projects under implementation. The research portfolio is influenced by factors external to the research system as well as internal to it. These last include the capacity of research institutions, the momentum of research programs, funding opportunities and the influence of stakeholder priorities and public opinion. These dimensions can vary in their degree of coordination, leading to a complementary or a fragmented research portfolio. OBJECTIVE: The main objective is to identify the themes currently being pursued in the research portfolio and agendas within developing countries and to quantify their frequency in an effort to identify current research topics and their underlying influences. METHODS: HPSR topics being pursued by developing country producer institutions and their perceived priorities were identified through a survey between 2000 and 2002. The response to a call for letters of intent issued by the Alliance in 2000 for a broad range of topics was also analyzed. The institutions that were the universe of this study consisted of the 176 institutional partners of the Alliance for Health Policy and Systems Research producing research in low and middle income countries outside Europe. HPSR topics as well as the beneficiaries or issues and the health problems addressed were content analyzed. Topics were classified into 19 categories and their frequency analyzed across groups of countries with similar per capita income. Agendas were identified by analyzing the source of funding and of project initiation for projects under implementation. RESULTS: The highest ranking topic at the aggregate level is "Sector analysis", followed by "Disease burden" and "Management and organization". Categories at the bottom of this ranking are "Equity", "Policy process", "Economic policy and health" and "Information systems". "Disease burden" is more often funded than other topics for which there is more demand or perceived priority. Analysis suggests few although important differences across priorities, demand for funding and actual project funding. The donors' agenda coincides most with the ranking of research topics overall.Ranking across country income groups shows important differences. Topics that gain prominence in low income countries are "Disease burden" and "Accessibility". In lower middle income countries "Insurance" gains prominence. In upper middle income countries "Decentralization/local health systems", "Equity" and "Policy process" are more prominent. "Program evaluation" is the most consistently ranked topic across income regions, showing a neutral influence by donors, governments or researchers. CONCLUSIONS: The framework proposed offers a basis to identify and contrast research needs, projects and products at the international level and to identify the actor agendas and their influence. Research gaps are suggested when comparing topic ranking against the challenges to health system strengthening and scaling up of disease control programs. Differences across per capita income groups suggests the need for differentiated priority setting mechanisms guiding international support. Data suggests that stakeholders have different agendas, and that donors predominate in determining the research portfolio. High-level consensus building at the national and international levels is necessary to ensure that the diverse agendas play a complementary role in support of health system objectives.The Ministerial Summit for Health Research to be held in Mexico in November 2004 should be an opportunity to analyze further data and to commit funding for priorities identified through sharing and discussion of agendas.

  16. Systematically biological prioritizing remediation sites based on datasets of biological investigations and heavy metals in soil

    NASA Astrophysics Data System (ADS)

    Lin, Wei-Chih; Lin, Yu-Pin; Anthony, Johnathen

    2015-04-01

    Heavy metal pollution has adverse effects on not only the focal invertebrate species of this study, such as reduction in pupa weight and increased larval mortality, but also on the higher trophic level organisms which feed on them, either directly or indirectly, through the process of biomagnification. Despite this, few studies regarding remediation prioritization take species distribution or biological conservation priorities into consideration. This study develops a novel approach for delineating sites which are both contaminated by any of 5 readily bioaccumulated heavy metal soil contaminants and are of high ecological importance for the highly mobile, low trophic level focal species. The conservation priority of each site was based on the projected distributions of 6 moth species simulated via the presence-only maximum entropy species distribution model followed by the subsequent application of a systematic conservation tool. In order to increase the number of available samples, we also integrated crowd-sourced data with professionally-collected data via a novel optimization procedure based on a simulated annealing algorithm. This integration procedure was important since while crowd-sourced data can drastically increase the number of data samples available to ecologists, still the quality or reliability of crowd-sourced data can be called into question, adding yet another source of uncertainty in projecting species distributions. The optimization method screens crowd-sourced data in terms of the environmental variables which correspond to professionally-collected data. The sample distribution data was derived from two different sources, including the EnjoyMoths project in Taiwan (crowd-sourced data) and the Global Biodiversity Information Facility (GBIF) ?eld data (professional data). The distributions of heavy metal concentrations were generated via 1000 iterations of a geostatistical co-simulation approach. The uncertainties in distributions of the heavy metals were then quantified based on the overall consistency between realizations. Finally, Information-Gap Decision Theory (IGDT) was applied to rank the remediation priorities of contaminated sites in terms of both spatial consensus of multiple heavy metal realizations and the priority of specific conservation areas. Our results show that the crowd-sourced optimization algorithm developed in this study is effective at selecting suitable data from crowd-sourced data. By using this technique the available sample data increased to a total number of 96, 162, 72, 62, 69 and 62 or, that is, 2.6, 1.6, 2.5, 1.6, 1.2 and 1.8 times that originally available through the GBIF professionally-assembled database. Additionally, for all species considered the performance of models, in terms of test-AUC values, based on the combination of both data sources exceeded those models which were based on a single data source. Furthermore, the additional optimization-selected data lowered the overall variability, and therefore uncertainty, of model outputs. Based on the projected species distributions, our results revealed that around 30% of high species hotspot areas were also identified as contaminated. The decision-making tool, IGDT, successfully yielded remediation plans in terms of specific ecological value requirements, false positive tolerance rates of contaminated areas, and expected decision robustness. The proposed approach can be applied both to identify high conservation priority sites contaminated by heavy metals, based on the combination of screened crowd-sourced and professionally-collected data, and in making robust remediation decisions.

  17. Notification: Preliminary Research to Evaluate Proposed Superfund Sites on the U.S. EPA's National Priorities List

    EPA Pesticide Factsheets

    Project #OPE-FY13-0018, April 4, 2013. The Office of Inspector General plans to begin preliminary research to evaluate proposed Superfund sites on the U.S. Environmental Protection Agency’s National Priorities List.

  18. Transit signal priority project, phase II : field and simulation evaluation results.

    DOT National Transportation Integrated Search

    2006-01-01

    Transit Signal Priority (TSP) is recognized as an emerging technology that is capable of enhancing traditional transit services. Basic green-extension TSP was implemented on U.S. Route 1 in the Northern Virginia Area (or Washington, DC metropolitan a...

  19. 38 CFR 59.50 - Priority list.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... priority group does not include applications for the addition or replacement of building utility systems, such as heating and air conditioning systems or building features, such as roof replacements. Projects... Americans with Disabilities Act; building systems and utilities (e.g., electrical; heating, ventilation, and...

  20. 78 FR 34901 - Final Priority; National Institute on Disability and Rehabilitation Research-Advanced...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ... Institute on Disability and Rehabilitation Research--Advanced Rehabilitation Research Training Program... priority for the Advanced Rehabilitation Research Training (ARRT) program under the Disability and Rehabilitation Research Projects and Centers Program administered by the National Institute on Disability and...

  1. 78 FR 42868 - Final Priority; National Institute on Disability and Rehabilitation Research-Rehabilitation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-18

    ... Institute on Disability and Rehabilitation Research--Rehabilitation Research and Training Centers AGENCY... for the Disability and Rehabilitation Research Projects and Centers Program administered by the National Institute on Disability and Rehabilitation Research (NIDRR). Specifically, we announce a priority...

  2. Using evaluation theory in priority setting and resource allocation.

    PubMed

    Smith, Neale; Mitton, Craig; Cornelissen, Evelyn; Gibson, Jennifer; Peacock, Stuart

    2012-01-01

    Public sector interest in methods for priority setting and program or policy evaluation has grown considerably over the last several decades, given increased expectations for accountable and efficient use of resources and emphasis on evidence-based decision making as a component of good management practice. While there has been some occasional effort to conduct evaluation of priority setting projects, the literatures around priority setting and evaluation have largely evolved separately. In this paper, the aim is to bring them together. The contention is that evaluation theory is a means by which evaluators reflect upon what it is they are doing when they do evaluation work. Theories help to organize thinking, sort out relevant from irrelevant information, provide transparent grounds for particular implementation choices, and can help resolve problematic issues which may arise in the conduct of an evaluation project. A detailed review of three major branches of evaluation theory--methods, utilization, and valuing--identifies how such theories can guide the development of efforts to evaluate priority setting and resource allocation initiatives. Evaluation theories differ in terms of their guiding question, anticipated setting or context, evaluation foci, perspective from which benefits are calculated, and typical methods endorsed. Choosing a particular theoretical approach will structure the way in which any priority setting process is evaluated. The paper suggests that explicitly considering evaluation theory makes key aspects of the evaluation process more visible to all stakeholders, and can assist in the design of effective evaluation of priority setting processes; this should iteratively serve to improve the understanding of priority setting practices themselves.

  3. Identifying educational priorities for occupational therapy students to prepare for mental health practice in Australia and New Zealand: Opinions of practising occupational therapists.

    PubMed

    Scanlan, Justin Newton; Pépin, Geneviève; Haracz, Kirsti; Ennals, Priscilla; Webster, Jayne S; Meredith, Pamela J; Batten, Rachel; Bowman, Siann; Bonassi, Marianne; Bruce, Rosie

    2015-10-01

    The effective preparation of occupational therapy students for mental health practice is critical to facilitate positive consumer outcomes, underpin optimal practice and support new graduates' professional identity. This project was established to determine a set of 'educational priorities' for occupational therapy students to prepare them for current (and future) entry-level practice in mental health, from the perspective of mental health occupational therapists in Australia and New Zealand. The study included two phases. In Phase One, participants identified what they considered to be important educational priorities for occupational therapy students to prepare them for practice in mental health. For Phase Two, an 'expert panel' was assembled to review and rank these using a Policy Delphi approach. Eighty-five participants provided educational priorities in Phase One. These were grouped into a total of 149 educational themes. In Phase Two, the expert panel (consisting of 37 occupational therapists from diverse locations and practice settings) prioritised these themes across three Delphi rounds. A final priority list was generated dividing educational themes into three prioritised categories: 29 'Essential', 25 'Important' and 44 'Optional' priorities. Highest-ranked priorities were: clinical reasoning, client-centred practice, therapeutic use of self, functional implications of mental illness, therapeutic use of occupation and mental health fieldwork experience. The priority list developed as part of this project provides additional information to support the review of occupational therapy curricula across Australia and New Zealand to ensure that new graduates are optimally prepared for mental health practice. © 2015 Occupational Therapy Australia.

  4. Priority arbitration mechanism

    DOEpatents

    Garmire, Derrick L [Kingston, NY; Herring, Jay R [Poughkeepsie, NY; Stunkel, Craig B [Bethel, CT

    2007-03-06

    A method is provided for selecting a data source for transmission on one of several logical (virtual) lanes embodied in a single physical connection. Lanes are assigned to either a high priority class or to a low priority class. One of six conditions is employed to determine when re-arbitration of lane priorities is desired. When this occurs a next source for transmission is selected based on a the specification of the maximum number of high priority packets that can be sent after a lower priority transmission has been interrupted. Alternatively, a next source for transmission is selected based on a the specification of the maximum number of high priority packets that can be sent while a lower priority packet is waiting. If initialized correctly, the arbiter keeps all of the packets of a high priority packet contiguous, while allowing lower priority packets to be interrupted by the higher priority packets, but not to the point of starvation of the lower priority packets.

  5. Advanced spacecraft fire safety: Proposed projects and program plan

    NASA Technical Reports Server (NTRS)

    Youngblood, Wallace W.; Vedha-Nayagam, M.

    1989-01-01

    A detailed review identifies spacecraft fire safety issues and the efforts for their resolution, particularly for the threats posed by the increased on-orbit duration, size, and complexity of the Space Station Freedom. Suggestions provided by a survey of Wyle consultants and outside fire safety experts were combined into 30 research and engineering projects. The projects were then prioritized with respect to urgency to meet Freedom design goals, status of enabling technology, cost, and so on, to yield 14 highest priority projects, described in terms of background, work breakdown structure, and schedule. These highest priority projects can be grouped into the thematic areas of fire detection, fire extinguishment, risk assessment, toxicology and human effects, and ground based testing. Recommendations for overall program management stress the need for NASA Headquarters and field center coordination, with information exchange through spacecraft fire safety oversight committees.

  6. 7 CFR 1780.17 - Selection priorities and process.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...) Projects that primarily recycle solid waste products thereby limiting the need for solid waste disposal—5..., DEPARTMENT OF AGRICULTURE (CONTINUED) WATER AND WASTE LOANS AND GRANTS General Policies and Requirements... solid waste violations—15 points. (c) Median household income priorities. The median household income of...

  7. 7 CFR 1780.17 - Selection priorities and process.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...) Projects that primarily recycle solid waste products thereby limiting the need for solid waste disposal—5..., DEPARTMENT OF AGRICULTURE (CONTINUED) WATER AND WASTE LOANS AND GRANTS General Policies and Requirements... solid waste violations—15 points. (c) Median household income priorities. The median household income of...

  8. 7 CFR 1780.17 - Selection priorities and process.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...) Projects that primarily recycle solid waste products thereby limiting the need for solid waste disposal—5..., DEPARTMENT OF AGRICULTURE (CONTINUED) WATER AND WASTE LOANS AND GRANTS General Policies and Requirements... solid waste violations—15 points. (c) Median household income priorities. The median household income of...

  9. 34 CFR 376.30 - What priorities are considered for support by the Secretary under this part?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... demonstrate effective Statewide approaches to transitional rehabilitation service delivery for youths with... illness, mental retardation, and learning disability. (d) Transitional rehabilitation services for institutionalized persons. This priority supports projects that demonstrate effective ways to assist youths and...

  10. 34 CFR 376.30 - What priorities are considered for support by the Secretary under this part?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... demonstrate effective Statewide approaches to transitional rehabilitation service delivery for youths with... illness, mental retardation, and learning disability. (d) Transitional rehabilitation services for institutionalized persons. This priority supports projects that demonstrate effective ways to assist youths and...

  11. 34 CFR 376.30 - What priorities are considered for support by the Secretary under this part?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... demonstrate effective Statewide approaches to transitional rehabilitation service delivery for youths with... illness, mental retardation, and learning disability. (d) Transitional rehabilitation services for institutionalized persons. This priority supports projects that demonstrate effective ways to assist youths and...

  12. 34 CFR 376.30 - What priorities are considered for support by the Secretary under this part?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... demonstrate effective Statewide approaches to transitional rehabilitation service delivery for youths with... illness, mental retardation, and learning disability. (d) Transitional rehabilitation services for institutionalized persons. This priority supports projects that demonstrate effective ways to assist youths and...

  13. 78 FR 38840 - Final Priority-National Institute on Disability and Rehabilitation Research-Rehabilitation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-28

    ... Rehabilitation Research--Rehabilitation Research and Training Centers AGENCY: Office of Special Education and... Disability and Rehabilitation Research Projects and Centers Program administered by the National Institute on Disability and Rehabilitation Research (NIDRR). Specifically, we announce a priority for a Rehabilitation...

  14. Priority data on marine and estuarine resources within northeastern National Parks: Inventory and acquisition needs

    USGS Publications Warehouse

    Hart, Tracy E.; Neckles, Hilary A.; Kopp, Blaine S.

    2013-01-01

    The purpose of this project was to guide development of a strategy for the inventory and mapping of submerged natural resources associated within 10 coastal parks of the National Park Service (NPS) Northeast Region (NER; see Table 1). Priority data needs were identified by the NER Ocean Stewardship Task Force. The majority of the NER priority data needs involve the biotic, chemical, and geological characterization of the seabed. Taken collectively, this demands a consistent and unified approach to habitat classification. The Coastal and Marine Ecological Classification Standard (CMECS) is endorsed by the Federal Geographic Data Committee (FGDC-STD-018) for classifying ecological units in coastal and marine environments, and is recommended as a framework for acquiring and organizing NER data. We prepared an inventory of existing data on priority marine and estuarine natural resources within the ten NER coastal parks. This report describes the data and information sources relevant to each park and identifies gaps in available data. Overwhelmingly and uniformly across all parks, the most pressing needs are consistent, high-resolution bathymetry and seafloor characterization data. Approaches for acquiring these data using an integrated, multi-resolution sampling framework are recommended.

  15. Are we studying what matters? Health priorities and NIH-funded biomedical engineering research.

    PubMed

    Rubin, Jessica B; Paltiel, A David; Saltzman, W Mark

    2010-07-01

    With the founding of the National Institute of Biomedical Imaging and Bioengineering (NIBIB) in 1999, the National Institutes of Health (NIH) made explicit its dedication to expanding research in biomedical engineering. Ten years later, we sought to examine how closely federal funding for biomedical engineering aligns with U.S. health priorities. Using a publicly accessible database of research projects funded by the NIH in 2008, we identified 641 grants focused on biomedical engineering, 48% of which targeted specific diseases. Overall, we found that these disease-specific NIH-funded biomedical engineering research projects align with national health priorities, as quantified by three commonly utilized measures of disease burden: cause of death, disability-adjusted survival losses, and expenditures. However, we also found some illnesses (e.g., cancer and heart disease) for which the number of research projects funded deviated from our expectations, given their disease burden. Our findings suggest several possibilities for future studies that would serve to further inform the allocation of limited research dollars within the field of biomedical engineering.

  16. Accommodating life sciences on the Space Station

    NASA Technical Reports Server (NTRS)

    Arno, Roger D.

    1987-01-01

    The NASA Ames Research Center Biological Research Project (BRP) is responsible for identifying and accommodating high priority life science activities, utilizing nonhuman specimens, on the Space Station and is charged to bridge the gap between the science community and the Space Station Program. This paper discusses the approaches taken by the BRP in accomodating these research objectives to constraints imposed by the Space Station System, while maintaining a user-friendly environment. Consideration is given to the particular research disciplines which are given priority, the science objectives in each of these disciplines, the functions and activities required by these objectives, the research equipment, and the equipment suits. Life sciences programs planned by the Space Station participating partners (USA, Europe, Japan, and Canada) are compared.

  17. Graphene/Mo2C heterostructure directly grown by chemical vapor deposition

    NASA Astrophysics Data System (ADS)

    Deng, Rongxuan; Zhang, Haoran; Zhang, Yanhui; Chen, Zhiying; Sui, Yanping; Ge, Xiaoming; Liang, Yijian; Hu, Shike; Yu, Guanghui; Jiang, Da

    2017-06-01

    Not Available Project supported by the National Natural Science Foundation of China (Grant Nos. 1402342, 11574338, and 11274333), the Hundred Talents Program of Chinese Academy of Sciences, the International Collaboration and Innovation Program on High Mobility Materials Engineering, Chinese Academy of Sciences (Grant No. KGZD-EW-303), and the "Strategic Priority Research Program (B)" of the Chinese Academy of Sciences (Grant No. XDB04040300).

  18. Identifying research priorities for health care priority setting: a collaborative effort between managers and researchers

    PubMed Central

    Smith, Neale; Mitton, Craig; Peacock, Stuart; Cornelissen, Evelyn; MacLeod, Stuart

    2009-01-01

    Background To date there has been relatively little published about how research priorities are set, and even less about methods by which decision-makers can be engaged in defining a relevant and appropriate research agenda. We report on a recent effort in British Columbia to have researchers and decision-makers jointly establish an agenda for future research into questions of resource allocation. Methods The researchers enlisted decision-maker partners from each of British Columbia's six health authorities. Three forums were held, at which researchers and decision-makers from various levels in the health authorities considered possible research areas related to three key focus areas: (1) generation and use of decision criteria and measurement of 'benefit' against such criteria; (2) identification of so-called 'disinvestment' opportunities; and (3) evaluation of the effectiveness of priority setting procedures. Detailed notes were taken from each forum and synthesized into a set of qualitative themes. Results Forum participants suggested that future research into healthcare priority setting would benefit from studies that were longitudinal, comparative, and/or interdisciplinary. As well, participants identified two broad theme areas in which specific research projects were deemed desirable. First, future research might usefully consider how formal priority setting and resource allocation projects are situated within a larger organizational and political context. Second, additional research efforts should be devoted to better understanding and improving the actual implementation of priority setting frameworks, particularly with respect to issues of change management and the resolution of impediments to action on recommendations for resource allocation. Conclusion We were able to validate the importance of initial areas posed to the group and observed emergence of additional concerns and directions of critical importance to these decision-makers at this time. It is likely that the results are broadly applicable to other healthcare contexts. The implementation of this research agenda in British Columbia will depend upon the ability of the researchers and decision-makers to develop particular projects that fit within the constraints of existing funding opportunities. The process of engagement itself had benefits in terms of connecting decision-makers with their peers and sparking increased interest in the use and refinement of priority setting frameworks. PMID:19754969

  19. MINOTAUR (Maryland's innovative orbital technologically advanced University rocket)

    NASA Technical Reports Server (NTRS)

    Lewis, Mark J.; Akin, Dave; Lind, Charles; Rice, T. (Editor); Vincent, W. (Editor)

    1992-01-01

    Over the past decade, there has been an increasing interest in designing small commercial launch vehicles. Some of these designs include OSC's Pegasus, and AMROC's Aquila. Even though these vehicles are very different in their overall design characteristics, they all share a common thread of being expensive to design and manufacture. Each of these vehicles has an estimated production and operations cost of over $15000/kg of payload. In response to this high cost factor, the University of Maryland is developing a cost-effective alternative launch vehicle, Maryland's Innovative Orbital Technologically Advanced University Rocket (MINOTAUR). A preliminary cost analysis projects that MINOTAUR will cost under $10000/kg of payload. MINOTAUR will also serve as an enriching project devoted to an entirely student-designed-and-developed launch vehicle. This preliminary design of MINOTAUR was developed entirely by undergraduates in the University of Maryland's Space Vehicle Design class. At the start of the project, certain requirements and priorities were established as a basis from which to begin the design phase: (1) carry a 100 kg payload into a 200 km circular orbit; (2) provide maximum student involvement in the design, manufacturing, and launch phases of the project; and (3) use hybrid propulsion throughout. The following is the list of the project's design priorities (from highest to lowest): (1) safety, (2) cost, (3) minimum development time, (4) maximum use of the off-the-shelf components, (5) performance, and (6) minimum use of pyrotechnics.

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Littlefield, Adriane C.; Munir, Ammar M.; Alnajjar, Abdalla Abdelaziz

    This report describes the findings of the effort initiated by the Arab Science and Technology Foundation and the Cooperative Monitoring Center at Sandia National Laboratories to identify, contact, and engage members of the Iraqi science and technology (S&T) community. The initiative is divided into three phases. The first phase, the survey of the Iraqi scientific community, shed light on the most significant current needs in the fields of science and technology in Iraq. Findings from the first phase will lay the groundwork for the second phase that includes the organization of a workshop to bring international support for the initiative,more » and simultaneously decides on an implementation mechanism. Phase three involves the execution of outcomes of the report as established in the workshop. During Phase 1 the survey team conducted a series of trips to Iraq during which they had contact with nearly 200 scientists from all sections of the country, representing all major Iraqi S&T specialties. As a result of these contacts, the survey team obtained over 450 project ideas from Iraqi researchers. These projects were revised and analyzed to identify priorities and crucial needs. After refinement, the result is approximately 170 project ideas that have been categorized according to their suitability for (1) developing joint research projects with international partners, (2) engaging Iraqi scientists in solving local problems, and (3) developing new business opportunities. They have also been ranked as to high, medium, or low priority.« less

  1. Cochrane Acute Respiratory Infections Group's Stakeholder Engagement Project identified systematic review priority areas.

    PubMed

    Scott, Anna Mae; Clark, Justin; Dooley, Liz; Jones, Ann; Jones, Mark; Del Mar, Chris

    2018-05-22

    Cochrane Acute Respiratory Infections (ARI) Group conducts systematic reviews of the evidence for treatment and prevention of ARIs. We report the results of a prioritisation project, aiming to identify highest priority systematic review topics. The project consisted of 2 Phases. Phase 1 analysed the gap between existing RCTs and Cochrane Systematic Reviews (reported previously). Phase 2 (reported here) consisted of a two-round survey. In round 1, respondents prioritised 68 topics and suggested up to 10 additional topics; in Round 2, respondents prioritised top 25 topics from Round 1. Respondents included clinicians, researchers, systematic reviewers, allied health, patients, and carers, from 33 different countries. In Round 1, 154 respondents identified 20 priority topics, most commonly selecting topics in non-specific ARIs, influenza, and common cold. 50 respondents also collectively suggested 134 additional topics. In Round 2, 78 respondents prioritised top 25 topics, most commonly in the areas of non-specific ARIs, pneumonia and influenza. We generated a list of priority systematic review topics, to guide the Cochrane ARI Group's systematic review work for the next 24 months. Stakeholder involvement enhanced the transparency of the process, and will increase the usability and relevance of the Group's work to stakeholders. Copyright © 2018 Elsevier Inc. All rights reserved.

  2. 40 CFR 35.915 - State priority system and project priorty list.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... State priority system and list must be designed to achieve optimum water quality management consistent... water quality management (WQM) plans. The State shall hold a public hearing before submission of the... also sets forth the administrative, management, and public participation procedures required to develop...

  3. 78 FR 26513 - Final Priorities and Definitions-NIDRR DRRP-Community Living and Participation, Health and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-07

    ... and refined analyses of data, producing observational findings, and creating other sources of research... Services announces priorities and definitions for the Disability and Rehabilitation Research Projects and Centers Program administered by the National Institute on Disability and Rehabilitation Research (NIDRR...

  4. 75 FR 26952 - National Institute on Disability and Rehabilitation Research (NIDRR)-Disability and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-13

    ... Social Security Administration, the Centers for Medicare and Medicaid Services, and other agencies, as... Education. ACTION: Notice of proposed priority. SUMMARY: The Assistant Secretary for Special Education and Rehabilitative Services proposes a priority for the Disability and Rehabilitation Research Projects and Centers...

  5. 78 FR 20069 - Proposed Priority-National Institute on Disability and Rehabilitation Research (NIDRR...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-03

    ... contribute to this outcome by emphasizing the principles of universal design in its product research and... Rehabilitation Research (NIDRR)--Rehabilitation Engineering Research Centers (RERCs)--Technologies To Support... priority for the Disability and Rehabilitation Research Projects and Centers Program administered by NIDRR...

  6. SALTON SEA SCIENTIFIC DRILLING PROJECT: SCIENTIFIC PROGRAM.

    USGS Publications Warehouse

    Sass, J.H.; Elders, W.A.

    1986-01-01

    The Salton Sea Scientific Drilling Project, was spudded on 24 October 1985, and reached a total depth of 10,564 ft. (3. 2 km) on 17 March 1986. There followed a period of logging, a flow test, and downhole scientific measurements. The scientific goals were integrated smoothly with the engineering and economic objectives of the program and the ideal of 'science driving the drill' in continental scientific drilling projects was achieved in large measure. The principal scientific goals of the project were to study the physical and chemical processes involved in an active, magmatically driven hydrothermal system. To facilitate these studies, high priority was attached to four areas of sample and data collection, namely: (1) core and cuttings, (2) formation fluids, (3) geophysical logging, and (4) downhole physical measurements, particularly temperatures and pressures.

  7. Multimode resource-constrained multiple project scheduling problem under fuzzy random environment and its application to a large scale hydropower construction project.

    PubMed

    Xu, Jiuping; Feng, Cuiying

    2014-01-01

    This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method.

  8. Multimode Resource-Constrained Multiple Project Scheduling Problem under Fuzzy Random Environment and Its Application to a Large Scale Hydropower Construction Project

    PubMed Central

    Xu, Jiuping

    2014-01-01

    This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method. PMID:24550708

  9. 34 CFR 642.34 - Priorities for funding.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... associations of persons having special knowledge with respect to the training needs of Special Programs... preparing students for doctoral studies. (14) Project evaluation. (15) Budget management. (16) Personnel management. (17) Reporting student and project performance. (18) Coordinating project activities with other...

  10. 76 FR 15961 - Funding Priorities and Selection Criterion; Disability and Rehabilitation Research Projects and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-22

    ... least one, but no more than two, site-specific research projects to test innovative approaches to... Criterion; Disability and Rehabilitation Research Projects and Spinal Cord Injury Model Systems Centers and Multi-Site Collaborative Research Projects AGENCY: Office of Special Education and Rehabilitative...

  11. Model Special Education Manpower Information and Management System. Final Report.

    ERIC Educational Resources Information Center

    Gilles, Cynthia

    The Massachusetts Special Education Manpower Planning Project is described. Relying on cooperative planning, the project developed a system to provide information on manpower planning, a system to link other agencies with the project, and annual statements of state special education training priorities. The project also collaborated with six other…

  12. Maritime Security: Potential Terrorist Attacks and Protection Priorities

    DTIC Science & Technology

    2007-01-09

    Liquefied Natural Gas: Siting and Safety .” Feb. 15, 2005. 108 U.S. Coast Guard. U.S. Coast Guard Captain of the Port Long Island Sound Waterways...Order Code RL33787 Maritime Security: Potential Terrorist Attacks and Protection Priorities January 9, 2007 Paul W. Parfomak and John Frittelli...Terrorist Attacks and Protection Priorities 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK

  13. 7 CFR 3430.904 - Project types and priorities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... ADMINISTRATIVE PROVISIONS New Era Rural Technology Competitive Grants Program § 3430.904 Project types and... the critical needs identified through stakeholder input and deemed appropriate by NIFA. (a) In...

  14. 7 CFR 3430.904 - Project types and priorities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... ADMINISTRATIVE PROVISIONS New Era Rural Technology Competitive Grants Program § 3430.904 Project types and... the critical needs identified through stakeholder input and deemed appropriate by NIFA. (a) In...

  15. 7 CFR 3430.904 - Project types and priorities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... ADMINISTRATIVE PROVISIONS New Era Rural Technology Competitive Grants Program § 3430.904 Project types and... the critical needs identified through stakeholder input and deemed appropriate by NIFA. (a) In...

  16. 78 FR 72600 - Proposed Priorities, Requirements, and Definitions-Charter Schools Program (CSP) Grants for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-03

    ...--Charter Schools Program (CSP) Grants for National Leadership Activities AGENCY: Office of Innovation and..., requirements, and definitions for CSP Grants for National Leadership Activities and may use these priorities... Secretary is taking this action to ensure that projects funded with CSP Grants for National Leadership...

  17. Technology Priorities and Preferences of Developmental Mathematics Instructors

    ERIC Educational Resources Information Center

    Zientek, Linda; Skidmore, Susan T.; Saxon, D. Patrick; Edmonson, Stacey

    2015-01-01

    With the omnipresence of technology in society came the inevitable integration into education. This manuscript provides results of a statewide survey of developmental mathematics instructors' technology preferences and priorities across all levels of developmental mathematics courses. The study was part of a larger project designed to explore the…

  18. Pres. Clinton's Education Priorities: Early 1993 Indications.

    ERIC Educational Resources Information Center

    Parker, Franklin

    Educators anticipate bold new education reform initiatives from President Bill Clinton and his Education Secretary, Richard Riley. A priority project is college tuition loans, repayable through voluntary public service jobs. The President also supports increased funding for the Head Start Program and money for a national apprenticeship program for…

  19. 34 CFR 380.7 - What priorities may the Secretary establish?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What priorities may the Secretary establish? 380.7 Section 380.7 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION SPECIAL PROJECTS AND DEMONSTRATIONS...

  20. 38 CFR 59.50 - Priority list.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... systems or features is necessary to remedy a cited threat to the lives or safety of residents and program... utility systems or features; such applications will be prioritized in accordance with the criteria in...) All other projects (e.g., nurse call systems, patient lifts). (ii) Priority group 1—subpriority 2. An...

  1. 38 CFR 59.50 - Priority list.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... systems or features is necessary to remedy a cited threat to the lives or safety of residents and program... utility systems or features; such applications will be prioritized in accordance with the criteria in...) All other projects (e.g., nurse call systems, patient lifts). (ii) Priority group 1—subpriority 2. An...

  2. 40 CFR 35.2024 - Combined sewer overflows.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2024 Combined sewer... project priority list, it addresses impaired uses in priority water quality areas which are due to the... must demonstrate to the Administrator that the water quality goals of the Act will not be achieved...

  3. 40 CFR 35.2024 - Combined sewer overflows.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2024 Combined sewer... project priority list, it addresses impaired uses in priority water quality areas which are due to the... must demonstrate to the Administrator that the water quality goals of the Act will not be achieved...

  4. 40 CFR 35.2024 - Combined sewer overflows.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2024 Combined sewer... project priority list, it addresses impaired uses in priority water quality areas which are due to the... must demonstrate to the Administrator that the water quality goals of the Act will not be achieved...

  5. 34 CFR 472.20 - What priorities may the Secretary establish?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION NATIONAL WORKPLACE LITERACY PROGRAM How Does the... to projects training adult workers who have inadequate basic skills and who— (1) Are currently unable... 34 Education 3 2012-07-01 2012-07-01 false What priorities may the Secretary establish? 472.20...

  6. 34 CFR 472.20 - What priorities may the Secretary establish?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION NATIONAL WORKPLACE LITERACY PROGRAM How Does the... to projects training adult workers who have inadequate basic skills and who— (1) Are currently unable... 34 Education 3 2014-07-01 2014-07-01 false What priorities may the Secretary establish? 472.20...

  7. 34 CFR 472.20 - What priorities may the Secretary establish?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION NATIONAL WORKPLACE LITERACY PROGRAM How Does the... to projects training adult workers who have inadequate basic skills and who— (1) Are currently unable... 34 Education 3 2013-07-01 2013-07-01 false What priorities may the Secretary establish? 472.20...

  8. 34 CFR 472.20 - What priorities may the Secretary establish?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION NATIONAL WORKPLACE LITERACY PROGRAM How Does the... to projects training adult workers who have inadequate basic skills and who— (1) Are currently unable... 34 Education 3 2011-07-01 2011-07-01 false What priorities may the Secretary establish? 472.20...

  9. 13 CFR 313.8 - Competitive process.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... implementation grant shall be reviewed by EDA in accord with a competitive process as set forth in the applicable FFO, to ensure that EDA awards funds to the most merit-worthy projects. (b) Priority for grants to small- and medium-sized Communities. EDA shall give priority to an application submitted under this part...

  10. Agricultural aviation user requirement priorities

    NASA Technical Reports Server (NTRS)

    Kaplan, R. L.; Meeland, T.; Peterson, J. E.

    1977-01-01

    The results are given of a research project pertaining to the development of agricultural aviation user requirement priorities. The raw data utilized in the project was obtained from the National Agricultural Aviation Association. A specially configured poll, developed by the Actuarial Research Corporation was used to solicit responses from NAAA members and others. The primary product of the poll is the specification of seriousness as determined by the respondents for some selected agricultural aviation problem areas identified and defined during the course of an intensive analysis by the Actuarial Research Corporation.

  11. Top ten research priorities for spinal cord injury: the methodology and results of a British priority setting partnership.

    PubMed

    van Middendorp, J J; Allison, H C; Ahuja, S; Bracher, D; Dyson, C; Fairbank, J; Gall, A; Glover, A; Gray, L; Masri, W El; Uttridge, A; Cowan, K

    2016-05-01

    This is a mixed-method consensus development project. The objective of this study was to identify a top ten list of priorities for future research into spinal cord injury (SCI). The British Spinal Cord Injury Priority Setting Partnership was established in 2013 and completed in 2014. Stakeholders included consumer organisations, healthcare professional societies and caregivers. This partnership involved the following four key stages: (i) gathering of research questions, (ii) checking of existing research evidence, (iii) interim prioritisation and (iv) a final consensus meeting to reach agreement on the top ten research priorities. Adult individuals with spinal cord dysfunction because of trauma or non-traumatic causes, including transverse myelitis, and individuals with a cauda equina syndrome (henceforth grouped and referred to as SCI) were invited to participate in this priority setting partnership. We collected 784 questions from 403 survey respondents (290 individuals with SCI), which, after merging duplicate questions and checking systematic reviews for evidence, were reduced to 109 unique unanswered research questions. A total of 293 people (211 individuals with SCI) participated in the interim prioritisation process, leading to the identification of 25 priorities. At a final consensus meeting, a representative group of individuals with SCI, caregivers and health professionals agreed on their top ten research priorities. Following a comprehensive, rigorous and inclusive process, with participation from individuals with SCI, caregivers and health professionals, the SCI research agenda has been defined by people to whom it matters most and should inform the scope and future activities of funders and researchers for the years to come. The NIHR Oxford Biomedical Research Centre provided core funding for this project.

  12. A GIS Approach to Prioritizing Habitat for Restoration Using Neotropical Migrant Songbird Criteria

    NASA Astrophysics Data System (ADS)

    Holzmueller, Eric J.; Gaskins, Michael D.; Mangun, Jean C.

    2011-07-01

    Restoration efforts to increase wildlife habitat quality in agricultural landscapes have limited funding and are typically done on a first come, first serve basis. In order to increase the efficiency of these restoration efforts, a prioritized ranking system is needed to obtain the greatest increase in habitat quality possible for the fewest amount of hectares restored. This project examines the use of a GIS based multi-criteria approach to prioritize lands for reforestation along the Kaskaskia River in Illinois. Loss of forested area and corresponding increase in forest fragmentation has decreased songbird habitat quality across the Midwestern United States. We prioritized areas for reforestation based on nine landscape metrics: available agricultural land, forest cover gaps, edge density, proximity to river, 200 m corridor area, total forest core area, fringe core area, distance to primary core value, and primary core area. The multi-criteria analysis revealed that high priority areas for reforestation were most likely to be close to the riparian corridor and existing large blocks of forest. Analysis of simulated reforestation (0, 0.5, 1.0, 5.0 10.0, 25.0, and 50.0% of highest priority parcels reforested) revealed different responses for multiple landscape metrics used to quantify forest fragmentation following reforestation, but indicated that the study area would get the greatest rate of return on reforestation efforts by reforesting 10.0% of the highest priority areas. This project demonstrates how GIS and a multi-criteria analysis approach can be used to increase the efficiency of restoration projects. This approach should be considered by land managers when attempting to identify the location and quantity of area for restoration within a landscape.

  13. A GIS approach to prioritizing habitat for restoration using neotropical migrant songbird criteria.

    PubMed

    Holzmueller, Eric J; Gaskins, Michael D; Mangun, Jean C

    2011-07-01

    Restoration efforts to increase wildlife habitat quality in agricultural landscapes have limited funding and are typically done on a first come, first serve basis. In order to increase the efficiency of these restoration efforts, a prioritized ranking system is needed to obtain the greatest increase in habitat quality possible for the fewest amount of hectares restored. This project examines the use of a GIS based multi-criteria approach to prioritize lands for reforestation along the Kaskaskia River in Illinois. Loss of forested area and corresponding increase in forest fragmentation has decreased songbird habitat quality across the Midwestern United States. We prioritized areas for reforestation based on nine landscape metrics: available agricultural land, forest cover gaps, edge density, proximity to river, 200 m corridor area, total forest core area, fringe core area, distance to primary core value, and primary core area. The multi-criteria analysis revealed that high priority areas for reforestation were most likely to be close to the riparian corridor and existing large blocks of forest. Analysis of simulated reforestation (0, 0.5, 1.0, 5.0 10.0, 25.0, and 50.0% of highest priority parcels reforested) revealed different responses for multiple landscape metrics used to quantify forest fragmentation following reforestation, but indicated that the study area would get the greatest rate of return on reforestation efforts by reforesting 10.0% of the highest priority areas. This project demonstrates how GIS and a multi-criteria analysis approach can be used to increase the efficiency of restoration projects. This approach should be considered by land managers when attempting to identify the location and quantity of area for restoration within a landscape.

  14. Educational Projects, 1986-87.

    ERIC Educational Resources Information Center

    Alberta Dept. of Education, Edmonton. Planning Services Branch.

    This handbook: (1) describes the educational research program of the Planning Services Branch of Alberta (Canada) Education; (2) outlines projects underway for 1986-87; and (3) describes projects completed between April 1985 and July 1986. Section 1, "The Educational Research Program," describes priorities, guidelines, and procedures for…

  15. 7 CFR 3430.304 - Project Types and priorities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... sciences and other related educational matters. Projects may include faculty development, student... and activities that deliver science-based knowledge and informal educational programs to people... interwoven throughout the life of the project and act to complement and reinforce one another. The proposed...

  16. 7 CFR 3430.304 - Project Types and priorities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... sciences and other related educational matters. Projects may include faculty development, student... and activities that deliver science-based knowledge and informal educational programs to people... interwoven throughout the life of the project and act to complement and reinforce one another. The proposed...

  17. 7 CFR 3430.304 - Project Types and priorities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... sciences and other related educational matters. Projects may include faculty development, student... and activities that deliver science-based knowledge and informal educational programs to people... interwoven throughout the life of the project and act to complement and reinforce one another. The proposed...

  18. 7 CFR 3430.304 - Project Types and priorities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... sciences and other related educational matters. Projects may include faculty development, student... and activities that deliver science-based knowledge and informal educational programs to people... interwoven throughout the life of the project and act to complement and reinforce one another. The proposed...

  19. 78 FR 22783 - Final Priority; National Institute on Disability and Rehabilitation Research-Disability and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-17

    ... Institute on Disability and Rehabilitation Research--Disability and Rehabilitation Research Projects and Centers Program--Disability Rehabilitation Research Project AGENCY: Office of Special Education and... Research Project (DRRP) on Knowledge Translation for Technology Transfer under the Disability and...

  20. Trade-Offs, Biases, and Uncertainty in Project Planning and Execution: A Problem-Based Simulation Exercise

    ERIC Educational Resources Information Center

    Smith-Daniels, Dwight E.; Smith-Daniels, Vicki L.

    2008-01-01

    The ability to plan and execute projects is a fundamental skill required among managers and business school graduates. In the opening phase of a project, the project team makes decisions about the relative priority of project time, cost, and performance objectives, oftentimes without complete information about customer and stakeholder…

  1. 7 CFR 3430.904 - Project types and priorities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ADMINISTRATIVE PROVISIONS New Era Rural Technology Competitive Grants Program § 3430.904 Project types and... on the critical needs identified through stakeholder input and deemed appropriate by CSREES. (a) In...

  2. Federal Great Lakes fishery research objectives, priorities, and projects

    USGS Publications Warehouse

    Tait, Howard D.

    1973-01-01

    Fishery productivity of the Great Lakes has declined drastically since settlement of the area. Premium quality fishes of the Great Lakes such as whitefish, lake trout, and walleyes have been replaced by less desired species. This change is attributed to selective overfishing, pollution, and the extreme instability of fish populations. Sea lamprey predation is still a vexing problem but progress is being made in controlling this parasite. The federal fishery research program with headquarters in Ann Arbor, Michigan, has the objective of providing baseline information, needed in resource use decisions, about the fishes of the Great Lakes. Studies of the habitat requirements of fish are high priority. The program includes fish population assessments, studies of the effects of mercury and other contaminants on fish, thermal effects studies, and general investigation of the impact of engineering projects on Great Lakes fisheries. The work is closely coordinated with state and Canadian agencies through the Great Lakes Fishery Commission. Four small research vessels and four field stations are utilized with a staff of 90 and an annual budget of about $1.5 million.

  3. Defense Modeling and Simulation Initiative

    DTIC Science & Technology

    1992-05-01

    project solicitation and priority ranking process, and reviewing policy issues . The activities of the DMSO and MSWG are also supported by a series of... issues have been raised for discussion, including: *Proumulgation of standards for the interoperability of models and simulations " Modeling and...have been completed or will be completed in the near term. The policy issues should be defined at a high level in the near term, although their

  4. Archaeological Sites Inventory of the High Priority Portions of Training Areas 1, 2, 3, 4, 5, 6, 11, 13, and H of the Pinon Canyon Maneuver Site, Las Animas County, Colorado

    DTIC Science & Technology

    2007-03-18

    is abundant over the PCMS, but within our 2001 project area locations, only intermittent arroyos and seasonal springs in the Timpas, Luning , Van...a hilltop above an unnamed tributary of Luning Arroyo. Four chert artifacts were identified, including two utilized/retouched flakes, a simple flake

  5. CINRG: Infrastructure for Clinical Trials in Duchenne Dystrophy

    DTIC Science & Technology

    2013-09-01

    research centers sharing a common goal of improving the quality of life of neuromuscular disease patients by cooperative planning , implementation, analysis...discrepancies were noted surrounding the regulatory binder, consent process and data records. The site personnel have a scheduled plan with the CINRG CC...missing long term follow-up visits). The project manager also reviewed the study records to date while onsite. A high priority plan was developed with the

  6. Climate Change and the Distribution of Neotropical Red-Bellied Toads (Melanophryniscus, Anura, Amphibia): How to Prioritize Species and Populations?

    PubMed Central

    Zank, Caroline; Becker, Fernando Gertum; Abadie, Michelle; Baldo, Diego; Maneyro, Raúl; Borges-Martins, Márcio

    2014-01-01

    We used species distribution modeling to investigate the potential effects of climate change on 24 species of Neotropical anurans of the genus Melanophryniscus. These toads are small, have limited mobility, and a high percentage are endangered or present restricted geographical distributions. We looked at the changes in the size of suitable climatic regions and in the numbers of known occurrence sites within the distribution limits of all species. We used the MaxEnt algorithm to project current and future suitable climatic areas (a consensus of IPCC scenarios A2a and B2a for 2020 and 2080) for each species. 40% of the species may lose over 50% of their potential distribution area by 2080, whereas 28% of species may lose less than 10%. Four species had over 40% of the currently known occurrence sites outside the predicted 2080 areas. The effect of climate change (decrease in climatic suitable areas) did not differ according to the present distribution area, major habitat type or phylogenetic group of the studied species. We used the estimated decrease in specific suitable climatic range to set a conservation priority rank for Melanophryniscus species. Four species were set to high conservation priority: M. montevidensis, (100% of its original suitable range and all known occurrence points potentially lost by 2080), M. sp.2, M. cambaraensis, and M. tumifrons. Three species (M. spectabilis, M. stelzneri, and M. sp.3) were set between high to intermediate priority (more than 60% decrease in area predicted by 2080); nine species were ranked as intermediate priority, while eight species were ranked as low conservation priority. We suggest that monitoring and conservation actions should be focused primarily on those species and populations that are likely to lose the largest area of suitable climate and the largest number of known populations in the short-term. PMID:24755937

  7. 2015 Pediatric Research Priorities in Prehospital Care.

    PubMed

    Browne, Lorin R; Shah, Manish I; Studnek, Jonathan R; Farrell, Brittany M; Mattrisch, Linda M; Reynolds, Stacy; Ostermayer, Daniel G; Brousseau, David C; Lerner, E Brooke

    2016-01-01

    Pediatric prehospital research has been limited, but work in this area is starting to increase particularly with the growth of pediatric-specific research endeavors. Given the increased interest in pediatric prehospital research, there is a need to identify specific research priorities that incorporate the perspective of prehospital providers and other emergency medical services (EMS) stakeholders. To develop a list of specific research priorities that is relevant, specific, and important to the practice of pediatric prehospital care. Three independent committees of EMS providers and researchers were recruited. Each committee developed a list of research topics. These topics were collated and used to initiate a modified Delphi process for developing consensus on a list of research priorities. Participants were the committee members. Topics approved by 80% were retained as research priorities. Topics that were rejected by more than 50% were eliminated. The remaining topics were modified and included on subsequent surveys. Each survey allowed respondents to add additional topics. The surveys were continued until all topics were either successfully retained or rejected and no new topics were suggested. Fifty topics were identified by the three independent committees. These topics were included on the initial electronic survey. There were 5 subsequent surveys. At the completion of the final survey a total of 29 research priorities were identified. These research priorities covered the following study areas: airway management, asthma, cardiac arrest, pain, patient-family interaction, resource utilization, seizure, sepsis, spinal immobilization, toxicology, trauma, training and competency, and vascular access. The research priorities were very specific. For example, under airway the priorities were: "identify the optimal device for effectively managing the airway in the prehospital setting" and "identify the optimal airway management device for specific disease processes." This project developed a list of relevant, specific, and important research priorities for pediatric prehospital care. Some similarities exist between this project and prior research agendas but this list represents a current, more specific research agenda and reflects the opinions of working EMS providers, researchers, and leaders. emergency medical technician; research; emergency medical services; priorities.

  8. On-going collaborative priority-setting for research activity: a method of capacity building to reduce the research-practice translational gap.

    PubMed

    Cooke, Jo; Ariss, Steven; Smith, Christine; Read, Jennifer

    2015-05-07

    International policy suggests that collaborative priority setting (CPS) between researchers and end users of research should shape the research agenda, and can increase capacity to address the research-practice translational gap. There is limited research evidence to guide how this should be done to meet the needs of dynamic healthcare systems. One-off priority setting events and time-lag between decision and action prove problematic. This study illustrates the use of CPS in a UK research collaboration called Collaboration and Leadership in Applied Health Research and Care (CLAHRC). Data were collected from a north of England CLAHRC through semi-structured interviews with 28 interviewees and a workshop of key stakeholders (n = 21) including academics, NHS clinicians, and managers. Documentary analysis of internal reports and CLAHRC annual reports for the first two and half years was also undertaken. These data were thematically coded. Methods of CPS linked to the developmental phase of the CLAHRC. Early methods included pre-existing historical partnerships with on-going dialogue. Later, new platforms for on-going discussions were formed. Consensus techniques with staged project development were also used. All methods demonstrated actual or potential change in practice and services. Impact was enabled through the flexibility of research and implementation work streams; 'matched' funding arrangements to support alignment of priorities in partner organisations; the size of the collaboration offering a resource to meet project needs; and the length of the programme providing stability and long term relationships. Difficulties included tensions between being responsive to priorities and the possibility of 'drift' within project work, between academics and practice, and between service providers and commissioners in the health services. Providing protected 'matched' time proved difficult for some NHS managers, which put increasing work pressure on them. CPS is more time consuming than traditional approaches to project development. CPS can produce needs-led projects that are bedded in services using a variety of methods. Contributing factors for effective CPS include flexibility in use and type of available resources, flexible work plans, and responsive leadership. The CLAHRC model provides a translational infrastructure that enables CPS that can impact on healthcare systems.

  9. An Emergency Medicine Research Priority Setting Partnership to establish the top 10 research priorities in emergency medicine.

    PubMed

    Smith, Jason; Keating, Liza; Flowerdew, Lynsey; O'Brien, Rachel; McIntyre, Sam; Morley, Richard; Carley, Simon

    2017-07-01

    Defining research priorities in a specialty as broad as emergency medicine is a significant challenge. In order to fund and complete the most important research projects, it is imperative that we identify topics that are important to all clinicians, society and to our patients. We have undertaken a priority setting partnership to establish the most important questions facing emergency medicine. The top 10 questions reached through a consensus process are discussed. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2017. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  10. Short Duration Emergency Incidents Managed as Projects

    NASA Astrophysics Data System (ADS)

    Nixon, Thomas J.

    Emergency incidents have historically been managed by experience and some directional principles usually found in SOPs/SOGs or other pre-incident planning documents. The use of experience has the risk of bias influencing the decisions being made in truly life or death situations. Responders of disasters, long duration emergency incidents, are often equipped with a framework adapted to the project management lifecycle to assure the project priorities are adequately addressed. The disaster framework provides for savings from risk, loss, waste. This research is demonstrating the ability and reasoning to develop a framework to address short duration emergency incidents and expand the events that can be managed as a project. The research of the literature found that a framework can be applied to the project management lifecycle and the priorities of a short duration emergency incident can be managed as a project. The limitations of not having the ability to conduct empirical testing and the risks of not developing a formal implementation plan are discussed. Short duration emergency incidents are found to be capable of being managed as projects and will benefit from the effectiveness of project management methodologies.

  11. Structural characterization of Al0.55Ga0.45N epitaxial layer determined by high resolution x-ray diffraction and transmission electron microscopy

    NASA Astrophysics Data System (ADS)

    Xu, Qing-Jun; Liu, Bin; Zhang, Shi-Ying; Tao, Tao; Xie, Zi-Li; Xiu, Xiang-Qian; Chen, Dun-Jun; Chen, Peng; Han, Ping; Zhang, Rong; Zheng, You-Dou

    2017-04-01

    Not Available Project supported by the National Key Research and Development Project of China (Grant No. 2016YFB0400100), the Hi-tech Research Project of China (Grant Nos. 2014AA032605 and 2015AA033305), the National Natural Science Foundation of China (Grant Nos. 61274003, 61422401, 51461135002, and 61334009), the Natural Science Foundation of Jiangsu Province, China (Grant Nos. BY2013077, BK20141320, and BE2015111), the Project of Green Young and Golden Phenix of Yangzhou City, the Postdoctoral Sustentation Fund of Jiangsu Province, China (Grant No. 1501143B), the Project of Shandong Provinceial Higher Educational Science and Technology Program, China (Grant No. J13LN08), the Solid State Lighting and Energy-saving Electronics Collaborative Innovation Center, Priority Academic Program Development of Jiangsu Higher Education Institutions (PAPD), and Research Funds from NJU-Yangzhou Institute of Opto-electronics.

  12. Identification of priority rail projects for Texas : initial methodology/user manual and guidebook.

    DOT National Transportation Integrated Search

    2012-05-01

    This project developed a system of evaluative tools for the Texas Department of Transportation (TxDOT) to : prioritize its investments in rail-related projects on a statewide basis. This work is meant to ensure that the : limited available funding fo...

  13. Special Projects: An Historical Analysis.

    ERIC Educational Resources Information Center

    Thomas, M. Angele; Bunsen, Teresa D.

    The Special Projects Competition is a separate federal government priority authorized to support an increased quantity and improved quality of personnel available to educate infants, toddlers, children, and youth with disabilities. Special project grants provide a means for the conceptualization of new approaches to preparation programs, the…

  14. Great Lakes restoration success through science: U.S. Geological Survey accomplishments 2010 through 2013

    USGS Publications Warehouse

    ,

    2014-01-01

    Tracking progress and working with partners. As of August 2013, the GLRI had funded more than 1,500 projects and programs of the highest priority to meet immediate cleanup, restoration, and protection needs. These projects use scientific analyses as the basis for identifying the restoration needs and priorities for the GLRI. Results from the science, monitoring, and other on-the-ground actions by the U.S. Geological Survey (USGS) provide the scientific information needed to help guide the Great Lakes restoration efforts. This document highlights a selection of USGS projects for each of the five focus areas through 2013, demonstrating the importance of science for restoration success. Additional information for these and other USGS projects that are important for Great Lakes restoration is available at http://cida.usgs.gov/glri/glri-catalog/.

  15. 77 FR 41391 - Final Priority; Rehabilitation Research and Training Center on Vocational Rehabilitation and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-13

    ... Research and Training Center (RRTCs) on Vocational Rehabilitation (VR) and Developing Strategies to Meet... Projects and Centers Program administered by NIDRR. Specifically, this priority is for an RRTC on VR and... effective VR practices that take into account economic conditions, labor market trends, and employer needs...

  16. 77 FR 2287 - FFP Project 17, LLC and Northland Power Mississippi River LLC; Notice Announcing Preliminary...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-17

    ... Drawing The Commission has received two preliminary permit applications deemed filed on February 1, 2011... drawing to determine the filing priority of the applicants identified in this notice. The Commission will... priority established by this drawing will be used to determine which applicant, among those with identical...

  17. 76 FR 15972 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-22

    ... Drawing Project No. Lock+ Hydro Friends Fund XXXVIII 13744-000 FFP Missouri 12, LLC 13755-000 Allegheny 2... Secretary of the Commission, or her designee, will conduct a random drawing to determine the filing priority... applications as provided in section 4.37 of its regulations.\\2\\ The priority established by this drawing will...

  18. 77 FR 2289 - FFP Project 41, LLC, Northland Power Mississippi River LLC; Notice Announcing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-17

    ... Permit Drawing The Commission has received two preliminary permit applications deemed filed on February 1... drawing to determine the filing priority of the applicants identified in this notice. The Commission will... priority established by this drawing will be used to determine which applicant, among those with identical...

  19. 77 FR 2287 - FFP Project 32, LLC and Northland Power Mississippi River LLC; Notice Announcing Preliminary...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-17

    ... Drawing The Commission has received two preliminary permit applications deemed filed on February 1, 2011... drawing to determine the filing priority of the applicants identified in this notice. The Commission will... priority established by this drawing will be used to determine which applicant, among those with identical...

  20. 77 FR 2287 - FFP Project 40, LLC and Northland Power Mississippi River LLC; Notice Announcing Preliminary...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-17

    ... Drawing The Commission has received two preliminary permit applications deemed filed on February 1, 2011..., or her designee, will conduct a random drawing to determine the filing priority of the applicants... section 4.37 of its regulations.\\2\\ The priority established by [[Page 2288

  1. 77 FR 2289 - FFP Project 39, LLC and Northland Power Mississippi River LLC; Notice Announcing Preliminary...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-17

    ... Drawing The Commission has received two preliminary permit applications deemed filed on February 1, 2011... drawing to determine the filing priority of the applicants identified in this notice. The Commission will... priority established by this drawing will be used to determine which applicant, among those with identical...

  2. 77 FR 2288 - FFP Project 21, LLC and Northland Power Mississippi River LLC; Notice Announcing Preliminary...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-17

    ... Drawing The Commission has received two preliminary permit applications deemed filed on February 1, 2011... drawing to determine the filing priority of the applicants identified in this notice. The Commission will... priority established by this drawing will be used to determine which applicant, among those with identical...

  3. 77 FR 2290 - FFP Project 30, LLC and Northland Power Mississippi River LLC; Notice Announcing Preliminary...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-17

    ... Drawing The Commission has received two preliminary permit applications deemed filed on February 1, 2011... drawing to determine the filing priority of the applicants identified in this notice. The Commission will... priority established by this drawing will be used to determine which applicant, among those with identical...

  4. BEHAVIOR AND ASSIMILATION OF ORGANIC AND INORGANIC PRIORITY POLLUTANTS CODISPOSED WITH MUNICIPAL REFUSE. A Project Summary. (EPA/SR-93/137)

    EPA Science Inventory

    Research was undertaken to demonstrate and evaluate the capacity of landfill systems to assimilate and attenuate inorganic and organic priority pollutants loadings codisposed with municipal refuse and to determine the fate and effect of the codisposed pollutants as landfill stabi...

  5. Prioritized LT Codes

    NASA Technical Reports Server (NTRS)

    Woo, Simon S.; Cheng, Michael K.

    2011-01-01

    The original Luby Transform (LT) coding scheme is extended to account for data transmissions where some information symbols in a message block are more important than others. Prioritized LT codes provide unequal error protection (UEP) of data on an erasure channel by modifying the original LT encoder. The prioritized algorithm improves high-priority data protection without penalizing low-priority data recovery. Moreover, low-latency decoding is also obtained for high-priority data due to fast encoding. Prioritized LT codes only require a slight change in the original encoding algorithm, and no changes at all at the decoder. Hence, with a small complexity increase in the LT encoder, an improved UEP and low-decoding latency performance for high-priority data can be achieved. LT encoding partitions a data stream into fixed-sized message blocks each with a constant number of information symbols. To generate a code symbol from the information symbols in a message, the Robust-Soliton probability distribution is first applied in order to determine the number of information symbols to be used to compute the code symbol. Then, the specific information symbols are chosen uniform randomly from the message block. Finally, the selected information symbols are XORed to form the code symbol. The Prioritized LT code construction includes an additional restriction that code symbols formed by a relatively small number of XORed information symbols select some of these information symbols from the pool of high-priority data. Once high-priority data are fully covered, encoding continues with the conventional LT approach where code symbols are generated by selecting information symbols from the entire message block including all different priorities. Therefore, if code symbols derived from high-priority data experience an unusual high number of erasures, Prioritized LT codes can still reliably recover both high- and low-priority data. This hybrid approach decides not only "how to encode" but also "what to encode" to achieve UEP. Another advantage of the priority encoding process is that the majority of high-priority data can be decoded sooner since only a small number of code symbols are required to reconstruct high-priority data. This approach increases the likelihood that high-priority data is decoded first over low-priority data. The Prioritized LT code scheme achieves an improvement in high-priority data decoding performance as well as overall information recovery without penalizing the decoding of low-priority data, assuming high-priority data is no more than half of a message block. The cost is in the additional complexity required in the encoder. If extra computation resource is available at the transmitter, image, voice, and video transmission quality in terrestrial and space communications can benefit from accurate use of redundancy in protecting data with varying priorities.

  6. BASF confirms plans for world-scale cracker on the Gulf Coast

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wood, A.

    BASF Corp. has confirmed plans that it will build a world-scale cracker on the Gulf Coast. The company has completed preliminary work, and {open_quotes}the results of our project analysis have been extremely encouraging,{close_quotes} says chemicals president Carl A. Jennings. {open_quotes}We`ll proceed with high priority to have the cracker ready for startup in second-half 2000.{close_quotes} The company says it will select a location for the project by mid-1977. In addition to considering its sites at Geismar, LA; Freeport, TX; and Altamira, Mexico, BASF says that {open_quotes}cooperative arrangements{close_quotes} are being looked at. That could include locating the project at a different site,more » adjacent to a feedstock source, according to Jennings. He says the project could also include joint venture partners.« less

  7. Funding priorities in animal reproduction at the United States Department of Agriculture's Cooperative State Research, Education, and Extension Service.

    PubMed

    Mirando, Mark A; Hamernik, Debora L

    2006-03-01

    The National Research Initiative (NRI) Competitive Grants Program is the U.S. Department of Agriculture's major competitive grants program and is administered by the Cooperative State Research, Education, and Extension Service (CSREES). Since its inception in 1991, the NRI has funded competitive grants in the discipline of animal reproduction. Previously, this program provided funding for a broad range of projects encompassing almost every subdiscipline in reproductive biology of farm animals, including aquatic species important to the aquaculture industry. During fiscal year 2004, the NRI Animal Reproduction Program narrowed the focus of funding priorities to the topics of infertility, basic mechanisms regulating fertility, cryopreservation of gametes, reducing the postpartum interval to conception, and sterilization methods or development of monosex populations. In response to a directive to further narrow the focus of funding priorities for fiscal year 2005 and beyond, CSREES conducted a Stakeholder Workshop on Funding Priorities in Animal Reproduction at the 37th Annual Meeting of the Society for the Study of Reproduction in Vancouver, Canada. More than 75 stakeholder scientists from a cross section of federal, public, and private institutions from across the United States participated in the workshop and provided recommendations to CSREES for future NRI-funding priorities in Animal Reproduction. The recommendations provided by stakeholders included continuing efforts to focus funding priorities into fewer high-impact areas relevant to animal agriculture and aquaculture. Recommendations also included movement back toward subdisciplines of animal reproduction that cut across all applicable species. The three funding priorities that consistently emerged as recommendations from the workshop participants were 1) gonadal function and production of gametes, 2) pituitary-hypothalamic function, and 3) embryo and conceptus development, including interaction between the conceptus and uterus. These funding priorities were considered when preparing the fiscal year 2006 NRI Request for Applications.

  8. Lessons from comparative effectiveness research methods development projects funded under the Recovery Act.

    PubMed

    Zurovac, Jelena; Esposito, Dominick

    2014-11-01

    The American Recovery and Reinvestment Act of 2009 (ARRA) directed nearly US$29.2 million to comparative effectiveness research (CER) methods development. To help inform future CER methods investments, we describe the ARRA CER methods projects, identify barriers to this research and discuss the alignment of topics with published methods development priorities. We used several existing resources and held discussions with ARRA CER methods investigators. Although funded projects explored many identified priority topics, investigators noted that much work remains. For example, given the considerable investments in CER data infrastructure, the methods development field can benefit from additional efforts to educate researchers about the availability of new data sources and about how best to apply methods to match their research questions and data.

  9. Space Radiation Effects on Inflatable Habitat Materials Project

    NASA Technical Reports Server (NTRS)

    Waller, Jess M.; Nichols, Charles

    2015-01-01

    The Space Radiation Effects on Inflatable Habitat Materials project provides much needed risk reduction data to assess space radiation damage of existing and emerging materials used in manned low-earth orbit, lunar, interplanetary, and Martian surface missions. More specifically, long duration (up to 50 years) space radiation damage will be quantified for materials used in inflatable structures (1st priority), as well as for habitable composite structures and space suits materials (2nd priority). The data acquired will have relevance for nonmetallic materials (polymers and composites) used in NASA missions where long duration reliability is needed in continuous or intermittent radiation fluxes. This project also will help to determine the service lifetimes for habitable inflatable, composite, and space suit materials.

  10. 18 CFR 4.83 - Cancellation and loss of priority.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... DETERMINATION OF PROJECT COSTS Application for Preliminary Permit; Amendment and Cancellation of Preliminary... application for a license for the proposed project. (b) Failure of a permittee to file an acceptable... application for a license for the proposed project. [Order 413, 50 FR 11686, Mar. 25, 1985] ...

  11. 18 CFR 4.83 - Cancellation and loss of priority.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... DETERMINATION OF PROJECT COSTS Application for Preliminary Permit; Amendment and Cancellation of Preliminary... application for a license for the proposed project. (b) Failure of a permittee to file an acceptable... application for a license for the proposed project. [Order 413, 50 FR 11686, Mar. 25, 1985] ...

  12. 18 CFR 4.83 - Cancellation and loss of priority.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... DETERMINATION OF PROJECT COSTS Application for Preliminary Permit; Amendment and Cancellation of Preliminary... application for a license for the proposed project. (b) Failure of a permittee to file an acceptable... application for a license for the proposed project. [Order 413, 50 FR 11686, Mar. 25, 1985] ...

  13. 18 CFR 4.83 - Cancellation and loss of priority.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... DETERMINATION OF PROJECT COSTS Application for Preliminary Permit; Amendment and Cancellation of Preliminary... application for a license for the proposed project. (b) Failure of a permittee to file an acceptable... application for a license for the proposed project. [Order 413, 50 FR 11686, Mar. 25, 1985] ...

  14. 18 CFR 4.83 - Cancellation and loss of priority.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... DETERMINATION OF PROJECT COSTS Application for Preliminary Permit; Amendment and Cancellation of Preliminary... application for a license for the proposed project. (b) Failure of a permittee to file an acceptable... application for a license for the proposed project. [Order 413, 50 FR 11686, Mar. 25, 1985] ...

  15. 76 FR 15964 - Funding Priorities: Disability and Rehabilitation Research Projects and Centers Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-22

    ... past five years, the DBTACs have published numerous journal articles, held a series of research... and Rehabilitation Research Projects and Centers Program AGENCY: Office of Special Education and... Disability and Rehabilitation Research Projects and Centers Program administered by the National Institute on...

  16. SAN FRANCISCO BAY ESTUARY PROJECT 2002 IR POST-CCMP NEP REPORT

    EPA Science Inventory

    The San Francisco Bay Estuary Project Implementation Review (IR) summarizes the progress and challenges ahead for the Project through examination of it activities in relation to the CCMP. Contents of the IR include: CCMP Implementation which has the status of efforts on Priority ...

  17. Development of a Florida Coastal Mapping Program Through Local and Regional Coordination

    NASA Astrophysics Data System (ADS)

    Hapke, C. J.; Kramer, P. A.; Fetherston-Resch, E.; Baumstark, R.

    2017-12-01

    The State of Florida has the longest coastline in the contiguous United States (2,170 km). The coastal zone is heavily populated and contains 1,900 km of sandy beaches that support economically important recreation and tourism. Florida's waters also host important marine mineral resources, unique ecosystems, and the largest number of recreational boats and saltwater fishermen in the country. There is increasing need and demand for high resolution data of the coast and adjacent seafloor for resource and habitat mapping, understanding coastal vulnerability, evaluating performance of restoration projects, and many other coastal and marine spatial planning efforts. The Florida Coastal Mapping Program (FCMP), initiated in 2017 as a regional collaboration between four federal and three state agencies, has goals of establishing the priorities for high resolution seafloor mapping of Florida's coastal environment, and developing a strategy for leveraging funds to support mapping priorities set by stakeholders. We began by creating a comprehensive digital inventory of existing data (collected by government, the private sector, and academia) from 1 kilometer inland to the 200 meter isobath for a statewide geospatial database and gap analysis. Data types include coastal topography, bathymetry, and acoustic data such as sidescan sonar and subbottom profiles. Next, we will develop appropriate proposals and legislative budget requests in response to opportunities to collect priority data in high priority areas. Data collection will be undertaken by a combination of state and federal agencies. The FCMP effort will provide the critical baseline information that is required for characterizing changes to fragile ecosystems, assessing marine resources, and forecasting the impacts on coastal infrastructure and recreational beaches from future storms and sea-level rise.

  18. Review of mobile health technology for military mental health.

    PubMed

    Shore, Jay H; Aldag, Matt; McVeigh, Francis L; Hoover, Ronald L; Ciulla, Robert; Fisher, Ashley

    2014-08-01

    Mental health problems pose challenges for military veterans, returning service members, and military family members including spouses and children. Challenges to meeting mental health needs include improving access to care and improving quality of care. Mobile Health, or "mHealth," can help meet these needs in the garrison and civilian environments. mHealth brings unique capabilities to health care provision through the use of mobile device technologies. This report identifies high-priority mHealth technology development considerations in two categories. First, priority considerations specific to mental health care provision include safety, privacy, evidence-based practice, efficacy studies, and temperament. Second, priority considerations broadly applicable to mHealth include security, outcomes, ease of use, carrier compliance, hardware, provider perspectives, data volume, population, regulation, command policy, and reimbursement. Strategic planning for the advancement of these priority considerations should be coordinated with stated Department of Defense capability needs to maximize likelihood of adoption. This report also summarizes three leading, military programs focused on mHealth projects in mental health, The Telemedicine and Advanced Technology Research Center, The Military Operational Medicine Research Program, United States Army Medical Research and Materiel Command, and The National Center for Telehealth and Technology. Reprint & Copyright © 2014 Association of Military Surgeons of the U.S.

  19. Analysis of interactions among barriers in project risk management

    NASA Astrophysics Data System (ADS)

    Dandage, Rahul V.; Mantha, Shankar S.; Rane, Santosh B.; Bhoola, Vanita

    2018-03-01

    In the context of the scope, time, cost, and quality constraints, failure is not uncommon in project management. While small projects have 70% chances of success, large projects virtually have no chance of meeting the quadruple constraints. While there is no dearth of research on project risk management, the manifestation of barriers to project risk management is a less dwelt topic. The success of project management is oftentimes based on the understanding of barriers to effective risk management, application of appropriate risk management methodology, proactive leadership to avoid barriers, workers' attitude, adequate resources, organizational culture, and involvement of top management. This paper represents various risk categories and barriers to risk management in domestic and international projects through literature survey and feedback from project professionals. After analysing the various modelling methods used in project risk management literature, interpretive structural modelling (ISM) and MICMAC analysis have been used to analyse interactions among the barriers and prioritize them. The analysis indicates that lack of top management support, lack of formal training, and lack of addressing cultural differences are the high priority barriers, among many others.

  20. Regulatory aspects of radiation protection.

    PubMed

    Janssens, A; Sarro Vaquero, M

    2005-01-01

    The paper introduces the projects launched by the European Community to foster prospects in dosimetry, radiation protection and best use of equipment in the medical field. These projects are put in perspective with the European legal framework for radiation protection, in particular, the Basic Safety Standards Directive, the Medical Exposures Directive and the Directive on High-Activity Sealed Sources. A summary is given of the overall mission statements of the commission services in the field of radiation protection, including the field of research, and how they relate to other actions in the overall health policy of the EU. In conclusion, a number of priority areas for future work in the medical field are highlighted.

  1. SOUTHWEST REGIONAL GAP ANALYSIS PROJECT: THE SECOND GENERATION

    EPA Science Inventory

    The project goal of providing useful information to the regional, state, and community stakeholders to assist them in understanding the environment, setting priorities, and making important decisions relative to conservation and sustainable resource management.

  2. Site-specific surveillance project at the Koppers Company, Inc. , National Priorities List Site, Texarkana, Texas. Final report, March 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    A site-specific surveillance project was conducted at the Koppers Company, a National Priorities List site. The findings indicated that living in the Koppers area was associated with a higher prevalance of reported rashes than among residents of a similar neighborhood in Texarkana not located near this site. Koppers residents did not appear to have higher rates of either adverse pregnancy outcomes or cancer than comparison residents. They did have many more concerns about their soil, water, and chemical odors in their neighborhood than did residents of the comparison neighborhood.

  3. Investments on Pro-poor Development Projects on Goats: Ensuring Success for Improved Livelihoods*

    PubMed Central

    Devendra, C.

    2013-01-01

    The elements that determine the success of development projects on goats and the prerequisites for ensuring this are discussed in the context of the bewildering diversity of goat genetic resources, production systems, multifunctionality, and opportunities for responding to constraints for productivity enhancement. Key determinants for the success of pro-poor projects are the imperatives of realistic project design, resolution of priorities and positive impacts to increase investments and spur agricultural growth, and appropriate policy. Throughout the developing world, there exist 97% of the total world population of 921 million goats across all agro-ecological zones (AEZs), including 570 breeds and 64% share of the breeds. They occupy a very important biological and socio-economic niche in farming systems making significant multifunctional contributions especially to food, nutrition and financial security, stability of farm households, and survival of the poor in the rural areas. Definitions are given of successful and failed projects. The analyses highlighted in successful projects the value of strong participatory efforts with farmers and climate change. Climate change effects on goats are inevitable and are mediated through heat stress, type of AEZ, water availability, quantity and quality of the available feed resources and type of production system. Within the prevailing production systems, improved integrated tree crops - ruminant systems are underestimated and are an important pathway to enhance C sequestration. Key development strategies and opportunities for research and development (R and D) are enormous, and include inter alia defining a policy framework, resolution of priority constraints using systems perspectives and community-based participatory activities, application of yield-enhancing technologies, intensification, scaling up, and impacts. The priority for development concerns the rainfed areas with large concentrations of ruminants in which goats, with a capacity to cope with heat tolerance, can be the entry point for development. Networks and networking are very important for the diffusion of information and can add value to R and D. Well formulated projects with clear priority setting and participatory R and D ensure success and the realisation of food security, improved livelihoods and self-reliance in the future. PMID:25049700

  4. Investments on Pro-poor Development Projects on Goats: Ensuring Success for Improved Livelihoods.

    PubMed

    Devendra, C

    2013-01-01

    The elements that determine the success of development projects on goats and the prerequisites for ensuring this are discussed in the context of the bewildering diversity of goat genetic resources, production systems, multifunctionality, and opportunities for responding to constraints for productivity enhancement. Key determinants for the success of pro-poor projects are the imperatives of realistic project design, resolution of priorities and positive impacts to increase investments and spur agricultural growth, and appropriate policy. Throughout the developing world, there exist 97% of the total world population of 921 million goats across all agro-ecological zones (AEZs), including 570 breeds and 64% share of the breeds. They occupy a very important biological and socio-economic niche in farming systems making significant multifunctional contributions especially to food, nutrition and financial security, stability of farm households, and survival of the poor in the rural areas. Definitions are given of successful and failed projects. The analyses highlighted in successful projects the value of strong participatory efforts with farmers and climate change. Climate change effects on goats are inevitable and are mediated through heat stress, type of AEZ, water availability, quantity and quality of the available feed resources and type of production system. Within the prevailing production systems, improved integrated tree crops - ruminant systems are underestimated and are an important pathway to enhance C sequestration. Key development strategies and opportunities for research and development (R and D) are enormous, and include inter alia defining a policy framework, resolution of priority constraints using systems perspectives and community-based participatory activities, application of yield-enhancing technologies, intensification, scaling up, and impacts. The priority for development concerns the rainfed areas with large concentrations of ruminants in which goats, with a capacity to cope with heat tolerance, can be the entry point for development. Networks and networking are very important for the diffusion of information and can add value to R and D. Well formulated projects with clear priority setting and participatory R and D ensure success and the realisation of food security, improved livelihoods and self-reliance in the future.

  5. Scientific Value and Educational Goals: Balancing Priorities and Increasing Adult Engagement in a Citizen Science Project

    ERIC Educational Resources Information Center

    Sickler, Jessica; Cherry, Tammy Messick; Allee, Leslie; Smyth, Rebecca Rice; Losey, John

    2014-01-01

    The Lost Ladybug Project is a citizen science project that engages individuals and groups in research and learning about ladybug population dynamics. With a dual purpose of advancing scientists' research about ladybug populations and achieving learning outcomes with participants, the project's summative evaluation led to critical reflection on the…

  6. The Future of the High North: Cooperation or Cold War

    DTIC Science & Technology

    2017-04-06

    fledged international organization,” and the 2010 delimitation agreement with Norway.42 However, demonstrating the Arctic´s role in Russian “nation...honored this position, through submitting claims to the U.N. in 11 2001,95 the first nation to do so, and through the 2010 delimitation agreement ...priority but a security issue, Russia is “reconsider[ing] its policy of involving Western countries in Arctic projects.”201 The agreement between

  7. 77 FR 3761 - Free Flow Power Corporation, Northland Power Mississippi River LLC; Notice Announcing Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-25

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12817-002, Project No. 14083-000] Free Flow Power Corporation, Northland Power Mississippi River LLC; Notice Announcing Filing... priority is as follows: 1. Free Flow Power Corporation; Project No. 12817-002. 2. Northland Power...

  8. 77 FR 64790 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-23

    ... DiCosmo, Remedial Project Manager, at [email protected] or David Novak, Community Involvement...: Nefertiti DiCosmo, Remedial Project Manager, U.S. Environmental Protection Agency (SR-6J), 77 West Jackson... FURTHER INFORMATION CONTACT: Nefertiti DiCosmo, Remedial Project Manager, U.S. Environmental Protection...

  9. 78 FR 49939 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-16

    ... : Follow online instructions for submitting comments. Email: Nefertiti DiCosmo, Remedial Project Manager... . Fax: Gladys Beard at (312) 697-2077. Mail: Nefertiti DiCosmo, Remedial Project Manager, U.S... FURTHER INFORMATION CONTACT: Nefertiti DiCosmo, Remedial Project Manager, U.S. Environmental Protection...

  10. Employment Projections and Program Priorities. AIR 1999 Annual Forum Paper.

    ERIC Educational Resources Information Center

    Rosenthal, Dan; Collier, Kitty

    This study compared occupational projections for Alabama with graduation rates in corresponding academic programs to provide a context for state and institutional policy decisions on new program initiatives and to comply with recent program viability legislation. The study examined number of degrees conferred, employment projections, and…

  11. Idaho National Laboratory Annual Report FY 2013 LDRD Project Summaries

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dena Tomchak

    The FY 2013 LDRD Annual Report is a compendium of the diverse research performed to develop and ensure the INL’s technical capabilities support the current and future DOE missions and national research priorities. LDRD is essential to INL—it provides a means for the Laboratory to maintain scientific and technical vitality while funding highly innovative, high-risk science and technology research and development (R&D) projects. The program enhances technical capabilities at the Laboratory, providing scientific and engineering staff with opportunities to explore proof-of-principle ideas, advanced studies of innovative concepts, and preliminary technical analyses. Established by Congress in 1991, the LDRD Program provesmore » its benefit each year through new programs, intellectual property, patents, copyrights, national and international awards, and publications.« less

  12. 77 FR 2288 - FFP Project 7, LLC and Northland Power Mississippi River LLC; Notice Announcing Preliminary...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-17

    ... Drawing The Commission has received two preliminary permit applications deemed filed on February 1, 2011... conduct a random drawing to determine the filing priority of the applicants identified in this notice. The...\\ The priority established by this drawing will be used to determine which applicant, among those with...

  13. 77 FR 2289 - FFP Project 33, LLC and Northland Power Mississippi River LLC; Notice Announcing Preliminary...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-17

    ... Drawing The Commission has received two preliminary permit applications deemed filed on February 1, 2011... conduct a random drawing to determine the filing priority of the applicants identified in this notice. The...\\ The priority established by this drawing will be used to determine which applicant, among those with...

  14. 77 FR 20408 - [FWS-R9-MB-2011-N215; 91400-5110-0000-7B; 91400-9410-0000-7B

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-04

    ... Sport Fish Restoration Act (16 U.S.C. 777 et seq.) and established the Multistate Conservation Grant...; 91400-9410-0000-7B] Multistate Conservation Grant Program; Priority List and Approval for Conservation... the fiscal year 2012, priority list of wildlife and sport fish conservation projects from the...

  15. 76 FR 44309 - Applications for New Awards; Charter Schools Program Grants to Non-State Educational Agencies for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-25

    ... application meets Competitive Preference Priority 1, up to an additional two points to an application depending on how well the application meets Competitive Preference Priority 2, and up to an additional two...: Applicants approved for funding under this competition must attend an in-person, two-day meeting for project...

  16. Priority technique for general aviation airport investments in Tennessee

    DOT National Transportation Integrated Search

    1999-01-01

    One issue state departments of transportation must address is the allocation of funds among competing general aviation airport projects. For example, the Tennessee Aeronautics Division administers an annual program for funding projects at airports th...

  17. Evaluation of Speed Control Signs for Small Rural Towns

    DOT National Transportation Integrated Search

    2006-04-14

    This report presents the results of the national evaluation of the Sacramento-Watt Avenue Transit Signal Priority Project, a cooperative project between Sacramento County and the Sacramento Regional Transit District (RT) to deploy transit signal prio...

  18. 7 CFR 1942.305 - Eligibility and priority.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... a family of 4 for the State is: (1) Less than poverty line—25 points, (2) more than poverty line but... rate—0 points. (B) Proposed project(s) will primarily be located in areas where Median Household Income...

  19. Biofiltration of volatile pollutants: Engineering mechanisms for improved design, long-term operation, prediction and implementation. 1998 annual progress report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Davison, B.H.; Klasson, K.T.; Barton, J.W.

    1998-06-01

    'Biofiltration systems can be used for treatment of volatile organic compounds (VOCs); however, the systems are poorly understood and are currently operated as black boxes. Common operational problems associated with biofilters include fouling, deactivation, and overgrowth, all of which make them ineffective for continuous, long-term use. The objective of this investigation is to develop generic methods for long-term stable operation, in particular by using selective limitation of supplemental nutrients while maintaining high activity. As part of this effort, the author will provide deeper fundamental understanding of the important biological and transport mechanisms in biodestruction of sparingly soluble VOCs and extendmore » this approach and mathematical models to additional systems of high priority EM relevance--direct degradation and cometabolic degradation of priority pollutants such as BTEX and chlorinated organics. This report summarizes work after 2 years of a 3-year project. Major results are enumerated and discussed'« less

  20. Operational research within a Global Fund supported tuberculosis project in India: why, how and its contribution towards change in policy and practice.

    PubMed

    Sagili, Karuna D; Satyanarayana, Srinath; Chadha, Sarabjit S; Wilson, Nevin C; Kumar, Ajay M V; Moonan, Patrick K; Oeltmann, John E; Chadha, Vineet K; Nagaraja, Sharath Burugina; Ghosh, Smita; Q Lo, Terrence; Volkmann, Tyson; Willis, Matthew; Shringarpure, Kalpita; Reddy, Ravichandra Chinnappa; Kumar, Prahlad; Nair, Sreenivas A; Rao, Raghuram; Yassin, Mohammed; Mwangala, Perry; Zachariah, Rony; Tonsing, Jamhoih; Harries, Anthony D; Khaparde, Sunil

    2018-01-01

    The Global Fund encourages operational research (OR) in all its grants; however very few reports describe this aspect. In India, Project Axshya was supported by a Global Fund grant to improve the reach and visibility of the government Tuberculosis (TB) services among marginalised and vulnerable communities. OR was incorporated to build research capacity of professionals working with the national TB programme and to generate evidence to inform policies and practices. To describe how Project Axshya facilitated building OR capacity within the country, helped in addressing several TB control priority research questions, documented project activities and their outcomes, and influenced policy and practice. From September 2010 to September 2016, three key OR-related activities were implemented. First, practical output-oriented modular training courses were conducted (n = 3) to build research capacity of personnel involved in the TB programme, co-facilitated by The Union, in collaboration with the national TB programme, WHO country office and CDC, Atlanta. Second, two large-scale Knowledge, Attitude and Practice (KAP) surveys were conducted at baseline and mid-project to assess the changes pertaining to TB knowledge, attitudes and practices among the general population, TB patients and health care providers over the project period. Third, studies were conducted to describe the project's core activities and outcomes. In the training courses, 44 participant teams were supported to develop research protocols on topics of national priority, resulting in 28 peer-reviewed scientific publications. The KAP surveys and description of project activities resulted in 14 peer-reviewed publications. Of the published papers at least 12 have influenced change in policy or practice. OR within a Global Fund supported TB project has resulted in building OR capacity, facilitating research in areas of national priority and influencing policy and practice. We believe this experience will provide guidance for undertaking OR in Global Fund projects.

  1. California Groundwater Ambient Monitoring and Assessment (GAMA) Program Priority Basin Project--shallow aquifer assessment

    USGS Publications Warehouse

    ,

    2013-01-01

    The California State Water Resources Control Board’s (SWRCB) GAMA Program is a comprehensive assessment of statewide groundwater quality in California. From 2004 to 2012, the GAMA Program’s Priority Basin Project focused on assessing groundwater resources used for public drinking-water supplies. More than 2,000 public-supply wells were sampled by U.S. Geological Survey (USGS) for this effort. Starting in 2012, the GAMA Priority Basin Project began an assessment of water resources in shallow aquifers in California. These shallow aquifers provide water for domestic and small community-supply wells, which are often drilled to shallower depths in the groundwater system than public-supply wells. Shallow aquifers are of interest because shallow groundwater may respond more quickly and be more susceptible to contamination from human activities at the land surface, than the deeper aquifers. The SWRCB’s GAMA Program was developed in response to the Groundwater Quality Monitoring Act of 2001 (Water Code sections 10780-10782.3): a public mandate to assess and monitor the quality of groundwater resources used for drinking-water supplies, and to increase the availability of information about groundwater quality to the public. The U.S. Geological Survey is the technical lead of the Priority Basin Project. Stewardship of California’s groundwater resources is a responsibility shared between well owners, communities, and the State. Participants and collaborators in the GAMA Program include Regional Water Quality Control Boards, Department of Water Resources, Department of Public Health, local and regional groundwater management entities, county and local water agencies, community groups, and private citizens. Well-owner participation in the GAMA Program is entirely voluntary.

  2. Accountable priority setting for trust in health systems--the need for research into a new approach for strengthening sustainable health action in developing countries.

    PubMed

    Byskov, Jens; Bloch, Paul; Blystad, Astrid; Hurtig, Anna-Karin; Fylkesnes, Knut; Kamuzora, Peter; Kombe, Yeri; Kvåle, Gunnar; Marchal, Bruno; Martin, Douglas K; Michelo, Charles; Ndawi, Benedict; Ngulube, Thabale J; Nyamongo, Isaac; Olsen, Oystein E; Onyango-Ouma, Washington; Sandøy, Ingvild F; Shayo, Elizabeth H; Silwamba, Gavin; Songstad, Nils Gunnar; Tuba, Mary

    2009-10-24

    Despite multiple efforts to strengthen health systems in low and middle income countries, intended sustainable improvements in health outcomes have not been shown. To date most priority setting initiatives in health systems have mainly focused on technical approaches involving information derived from burden of disease statistics, cost effectiveness analysis, and published clinical trials. However, priority setting involves value-laden choices and these technical approaches do not equip decision-makers to address a broader range of relevant values - such as trust, equity, accountability and fairness - that are of concern to other partners and, not least, the populations concerned. A new focus for priority setting is needed.Accountability for Reasonableness (AFR) is an explicit ethical framework for legitimate and fair priority setting that provides guidance for decision-makers who must identify and consider the full range of relevant values. AFR consists of four conditions: i) relevance to the local setting, decided by agreed criteria; ii) publicizing priority-setting decisions and the reasons behind them; iii) the establishment of revisions/appeal mechanisms for challenging and revising decisions; iv) the provision of leadership to ensure that the first three conditions are met.REACT - "REsponse to ACcountable priority setting for Trust in health systems" is an EU-funded five-year intervention study started in 2006, which is testing the application and effects of the AFR approach in one district each in Kenya, Tanzania and Zambia. The objectives of REACT are to describe and evaluate district-level priority setting, to develop and implement improvement strategies guided by AFR and to measure their effect on quality, equity and trust indicators. Effects are monitored within selected disease and programme interventions and services and within human resources and health systems management. Qualitative and quantitative methods are being applied in an action research framework to examine the potential of AFR to support sustainable improvements to health systems performance.This paper reports on the project design and progress and argues that there is a high need for research into legitimate and fair priority setting to improve the knowledge base for achieving sustainable improvements in health outcomes.

  3. The prioritisation of invasive alien plant control projects using a multi-criteria decision model informed by stakeholder input and spatial data.

    PubMed

    Forsyth, G G; Le Maitre, D C; O'Farrell, P J; van Wilgen, B W

    2012-07-30

    Invasions by alien plants are a significant threat to the biodiversity and functioning of ecosystems and the services they provide. The South African Working for Water program was established to address this problem. It needs to formulate objective and transparent priorities for clearing in the face of multiple and sometimes conflicting demands. This study used the analytic hierarchy process (a multi-criteria decision support technique) to develop and rank criteria for prioritising alien plant control operations in the Western Cape, South Africa. Stakeholder workshops were held to identify a goal and criteria and to conduct pair-wise comparisons to weight the criteria with respect to invasive alien plant control. The combination of stakeholder input (to develop decision models) with data-driven model solutions enabled us to include many alternatives (water catchments), that would otherwise not have been feasible. The most important criteria included the capacity to maintain gains made through control operations, the potential to enhance water resources and conserve biodiversity, and threats from priority invasive alien plant species. We selected spatial datasets and used them to generate weights that could be used to objectively compare alternatives with respect to agreed criteria. The analysis showed that there are many high priority catchments which are not receiving any funding and low priority catchments which are receiving substantial allocations. Clearly, there is a need for realigning priorities, including directing sufficient funds to the highest priority catchments to provide effective control. This approach provided a tractable, consensus-based solution that can be used to direct clearing operations. Copyright © 2012 Elsevier Ltd. All rights reserved.

  4. Comparison and alignment of an academic medical center's strategic goals with ASHP initiatives.

    PubMed

    Engels, Melanie J; Chaffee, Bruce W; Clark, John S

    2015-12-01

    An academic medical center's strategic goals were compared and aligned with the 2015 ASHP Health-System Pharmacy Initiative and the Pharmacy Practice Model Initiative (PPMI). The department's pharmacy practice model steering committee identified potential solutions to narrow prioritized gaps using a modified nominal group technique and a multivoting dot technique. Five priority solutions were identified and assigned to work groups to develop business plans, which included admission medication history and reconciliation for high-risk patients and those with complex medication regimens, pharmacist provision of discharge counseling to high-risk patients and those with complex medication regimens, improved measurement and reporting of the impact of PPMI programs on patient outcomes, implementation of a departmentwide formalized peer review and evaluation process, and the greeting of every patient at some time during his or her visit by a pharmacy team member. Stakeholders evaluated the business plans based on feasibility, financial return on investment, and anticipated safety enhancements. The solution that received the highest priority ranking and was subsequently implemented was "improved measurement and reporting of the impact of PPMI programs on patient outcomes." A defined process was followed for identifying gaps among current practices at an academic medical center and the 2015 ASHP Health-System Pharmacy Initiative and the PPMI. A key priority to better document the impact of pharmacists on patient care was identified for our department by using a nominal group technique brainstorming process and a multivoting dot technique and creating standardized business plans for five potential priority projects. Copyright © 2015 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  5. Chronic condition self-management surveillance: what is and what should be measured?

    PubMed

    Ruiz, Sarah; Brady, Teresa J; Glasgow, Russell E; Birkel, Richard; Spafford, Michelle

    2014-06-19

    The rapid growth in chronic disease prevalence, in particular the prevalence of multiple chronic conditions, poses a significant and increasing burden on the health of Americans. Maximizing the use of proven self-management (SM) strategies is a core goal of the US Department of Health and Human Services. Yet, there is no systematic way to assess how much SM or self-management support (SMS) is occurring in the United States. The purpose of this project was to identify appropriate concepts or measures to incorporate into national SM and SMS surveillance. A multistep process was used to identify candidate concepts, assess existing measures, and select high-priority concepts for further development. A stakeholder survey, an environmental scan, subject matter expert feedback, and a stakeholder priority-setting exercise were all used to select the high-priority concepts for development. The stakeholder survey gathered feedback on 32 candidate concepts; 9 concepts were endorsed by more than 66% of respondents. The environmental scan indicated few existing measures that adequately reflected the candidate concepts, and those that were identified were generally specific to a defined condition and not gathered on a population basis. On the basis of the priority setting exercises and environmental scan, we selected 1 concept from each of 5 levels of behavioral influence for immediate development as an SM or SMS indicator. The absence of any available measures to assess SM or SMS across the population highlights the need to develop chronic condition SM surveillance that uses national surveys and other data sources to measure national progress in SM and SMS.

  6. Secretary's Discretionary Program: Planning Grant To Develop Teacher Incentive Projects. Final Report. Support for Innovative Teacher Projects.

    ERIC Educational Resources Information Center

    Gittman, Elizabeth; Gottlieb, Karen

    Support for Innovative Teacher Projects was a 12-month program implemented by the Board of Cooperative Education Services (BOCES) of Nassau County, New York, designed to encourage and assist teachers in developing innovative projects in priority areas and in applying for funding. In collaboration with a university school of education, the project…

  7. Use of Falling Weight Deflectometer Data for Assessing Pavement Structural Evaluation Values

    DOT National Transportation Integrated Search

    1999-09-01

    Structural evaluation can be very useful at the network level for project prioritization purposes. In the project priority ranking procedure of the Kansas Department of Transportation (KDOT), a pavement rating attribute, Pavement Structural Evaluatio...

  8. The Research to Action Project: Applied Workplace Solutions for Nurses.

    PubMed

    Silas, Linda

    2012-03-01

    The number of new nurses entering the profession has increased, but the need to retain nurses in the profession continues to be a critical priority. The consequences of the nursing shortage are reflected in continued high levels of overtime, absenteeism and turnover. The Canadian Federation of Nurses Unions (CFNU), in partnership with the Canadian Nurses Association, the Canadian Healthcare Association and the Dietitians of Canada, initiated the project Research to Action: Applied Workplace Solutions for Nurses (RTA). The RTA initiative comprised research-based pilot projects, implemented in 10 jurisdictions across the country, that aimed to improve workplaces and increase the retention and recruitment of nurses. Unions, employers, governments, universities and professional associations came together in an unprecedented show of collaboration. Lessons and knowledge were shared among the projects, which were evaluated for their viability in other jurisdictions and professions. The pilots led to increased leadership, engagement and professional development, and decreased overtime, absenteeism and turnover.

  9. 34 CFR 280.32 - How is priority given to applicants?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... part, by considering— (1) The costs of fully implementing the magnet schools project as proposed; (2) The resources available to the applicant to carry out the project if funds under the program were not provided; (3) The extent to which the costs of the project exceed the applicant's resources; and (4) The...

  10. 78 FR 37652 - Environmental Impact Statements; National Summary of Rescinded Notices of Intent

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-21

    .... No further Federal resources will be expended on these projects; the environmental review process has been terminated. Four projects are being reassessed and may be reconsidered in whole or in part, by the... projects that are no longer a priority or that lack financial resources should be [[Page 37653

  11. Florida Title VI Education for the Handicapped Project Evaluation Reports.

    ERIC Educational Resources Information Center

    Florida State Dept. of Education, Tallahassee. Div. of Elementary and Secondary Education.

    Reported were 11 project evaluations for fiscal year 1971 for 17 Florida county projects concerning educational program effectiveness for handicapped children, as authorized by P.L. 91-230, Education of the Handicapped Act, and funded by the federal government. Eight priority problem areas established were the needs for instructional resource and…

  12. Research Priorities in Sudden Unexpected Infant Death: An International Consensus.

    PubMed

    Hauck, Fern R; McEntire, Betty L; Raven, Leanne K; Bates, Francine L; Lyus, Lucy A; Willett, Alexis M; Blair, Peter S

    2017-07-27

    Despite the success of safe sleep campaigns and the progress in understanding risk factors, the rate of reduction in the cases of sudden infant death syndrome has now slowed and it remains a leading cause of postneonatal mortality in many developed countries. Strategic action is needed to tackle this problem and it is now vital to identify how the sudden infant death research community may best target its efforts. The Global Action and Prioritization of Sudden Infant Death Project was an international consensus process that aimed to define and direct future research by investigating the priorities of expert and lay members of the sudden unexpected infant death (SUID) community across countries. The aim was to identify which areas of research should be prioritized to reduce the number of SUID deaths globally. Scientific researchers, clinicians, counselors, educators, and SUID parents from 25 countries took part across 2 online surveys to identify potential research priorities. Workshops subsequently took place in the United Kingdom, United States, and Australia to reach consensus and 10 priority areas for research were established. Three main themes among the priorities emerged: (1) a better understanding of mechanisms underlying SUID, (2) ensuring best practice in data collection, management and sharing, and (3) a better understanding of target populations and more effective communication of risk. SUID is a global problem and this project provides the international SUID community with a list of shared research priorities to more effectively work toward explaining and reducing the number of sudden infant deaths. Copyright © 2017 by the American Academy of Pediatrics.

  13. The Cosmos on a Shoestring. Small Spacecraft for Space and Earth Science

    DTIC Science & Technology

    1998-01-01

    uniform microwave profile. The MAP (553 kg) mission will complete a survey of the cosmos with a sensitiv - ity two orders of magnitude greater than...economic, ecological, social , and technical risks to which the project is exposed. It requires an understand- ing of the elements that drive risk...give high priority to reducing risks below historical values. The effect of a mis- sion loss on public and media interest in space must also be

  14. Operational research within a Global Fund supported tuberculosis project in India: why, how and its contribution towards change in policy and practice

    PubMed Central

    Sagili, Karuna D; Satyanarayana, Srinath; Chadha, Sarabjit S; Wilson, Nevin C; Kumar, Ajay M V; Oeltmann, John E; Chadha, Vineet K; Nagaraja, Sharath Burugina; Ghosh, Smita; Q Lo, Terrence; Volkmann, Tyson; Willis, Matthew; Shringarpure, Kalpita; Reddy, Ravichandra Chinnappa; Kumar, Prahlad; Nair, Sreenivas A; Rao, Raghuram; Yassin, Mohammed; Mwangala, Perry; Zachariah, Rony; Tonsing, Jamhoih; Harries, Anthony D; Khaparde, Sunil

    2018-01-01

    ABSTRACT Background: The Global Fund encourages operational research (OR) in all its grants; however very few reports describe this aspect. In India, Project Axshya was supported by a Global Fund grant to improve the reach and visibility of the government Tuberculosis (TB) services among marginalised and vulnerable communities. OR was incorporated to build research capacity of professionals working with the national TB programme and to generate evidence to inform policies and practices. Objectives: To describe how Project Axshya facilitated building OR capacity within the country, helped in addressing several TB control priority research questions, documented project activities and their outcomes, and influenced policy and practice. Methods: From September 2010 to September 2016, three key OR-related activities were implemented. First, practical output-oriented modular training courses were conducted (n = 3) to build research capacity of personnel involved in the TB programme, co-facilitated by The Union, in collaboration with the national TB programme, WHO country office and CDC, Atlanta. Second, two large-scale Knowledge, Attitude and Practice (KAP) surveys were conducted at baseline and mid-project to assess the changes pertaining to TB knowledge, attitudes and practices among the general population, TB patients and health care providers over the project period. Third, studies were conducted to describe the project’s core activities and outcomes. Results: In the training courses, 44 participant teams were supported to develop research protocols on topics of national priority, resulting in 28 peer-reviewed scientific publications. The KAP surveys and description of project activities resulted in 14 peer-reviewed publications. Of the published papers at least 12 have influenced change in policy or practice. Conclusions: OR within a Global Fund supported TB project has resulted in building OR capacity, facilitating research in areas of national priority and influencing policy and practice. We believe this experience will provide guidance for undertaking OR in Global Fund projects. PMID:29553308

  15. 75 FR 13134 - Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-18

    ...)(6). Grant applications for the Medical Liability and Safety Innovation Projects (R21) applications... disclosure under the above- cited statutes. SEP Meeting on: Medical Liability and Safety Innovation Projects..., Committee Management Officer, Office of Extramural Research, Education and Priority Populations, AHRQ, 540...

  16. Advanced Research Projects Agency counterdrug program

    NASA Astrophysics Data System (ADS)

    Pennella, John J.

    1994-03-01

    The Department of Defense (DoD), in support of the National Drug Control Strategy, has designated that detecting and countering the production, trafficking and use of illegal drugs is a high priority national security mission. The Advanced Research Projects Agency (ARPA) Counterdrug Program is assisting DoD in this objective by developing technology and prototype systems to enhance the capabilities of the DoD and civilian law enforcement agencies, consistent with the DoD mission and the supply reduction goals of the National Drug Control Strategy. The objective of this paper is to summarize the current ARPA Counterdrug Program, with special emphasis on the current efforts and future plans for developing technology to meet the National needs for Non-Intrusive Inspection.

  17. National preceptor development program (PDP): Influential evidence and theory. The first of a 3-part series.

    PubMed

    Mulherin, Katrina; Walter, Sheila; Cox, Craig D

    2018-03-01

    Priority #3 of the Canadian Experiential Education Project for Pharmacy provided evidence-based guidance for the design and implementation of a national approach to preceptor development. In this first article (of three), findings from the project and recommendations to achieve a high-quality preceptor development program (PDP) are presented. A multi-method approach including detailed semi-structured interviews, classic literature review, and advisory committee feedback was employed. The research team performed an integrated analysis of all data to achieve the objectives of Priority #3. Fifteen formal interviews, 167 articles and two stakeholder meetings informed findings. Experiential Education programs exhibited commonality in content and usually delivered programs online using modules or live lectures. Not all programs required preceptor education despite it being mandated by academic accreditors. Academics' perceptions varied regarding pharmacists' baseline knowledge, skills and attitudes prior to engaging in the preceptor role. A national approach to a PDP was desired if jurisdictional content was accommodated. Copious interprofessional literature of generally fair quality did not identify superior preceptor development approaches although there were numerous descriptions of interventions. Only 29 articles measured educational outcomes. Outcomes included satisfaction rates, self-efficacy and perceived knowledge, skill retention, skill implementation and participation rates. Twelve recommendations were identified to guide successful development of a national PDP. In the absence of good evidence, adult educational theory provided a basis for an effective PDP. Findings from Priority #3 may be relevant not only to pharmacy in Canada but other health professions and counterparts in other western nations with similar approaches to professional education. Copyright © 2017 Elsevier Inc. All rights reserved.

  18. Coastal resource and sensitivity mapping of Vietnam

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Odin, L.M.

    1997-08-01

    This paper describes a project to establish a relationship between environmental sensitivity (primarily to oil pollution) and response planning and prevention priorities for Vietnamese coastal regions. An inventory of coastal environmental sensitivity and the creation of index mapping was performed. Satellite and geographical information system data were integrated and used for database creation. The database was used to create a coastal resource map, coastal sensitivity map, and a field inventory base map. The final coastal environment sensitivity classification showed that almost 40 percent of the 7448 km of mapped shoreline has a high to medium high sensitivity to oil pollution.

  19. 23 CFR 924.9 - Planning.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... evaluation process to analyze and assess results achieved by the HSIP and uses this information, where... program of projects, technologies, or strategies to reduce or eliminate highway safety hazards; (G) Adopts... elements to develop highway safety improvement projects. (5) A process for establishing priorities for...

  20. 23 CFR 924.9 - Planning.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... evaluation process to analyze and assess results achieved by the HSIP and uses this information, where... program of projects, technologies, or strategies to reduce or eliminate highway safety hazards; (G) Adopts... elements to develop highway safety improvement projects. (5) A process for establishing priorities for...

  1. 23 CFR 924.9 - Planning.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... evaluation process to analyze and assess results achieved by the HSIP and uses this information, where... program of projects, technologies, or strategies to reduce or eliminate highway safety hazards; (G) Adopts... elements to develop highway safety improvement projects. (5) A process for establishing priorities for...

  2. 77 FR 13317 - Notice Announcing Filing Priority for Preliminary Permit Applications: Lock+ Hydro Friends Fund...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... Applications: Lock+ Hydro Friends Fund VIII; FFP Project 92, LLC; Riverbank Hydro No. 24, LLC On February 28.... 14276-000. 2. Riverbank Hydro No. 24, LLC: Project No. 14280-000. 3. Lock+ Hydro Friends Fund VIII...

  3. 78 FR 22817 - Proposed Priority-National Institute on Disability and Rehabilitation Research-Disability and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-17

    ... Institute on Disability and Rehabilitation Research--Disability and Rehabilitation Research Projects and Centers Program--Rehabilitation Engineering Research Centers AGENCY: Office of Special Education and... Research Projects and Centers Program administered by the National Institute on Disability and...

  4. The Starlite Project - Prototyping Real-Time Software.

    DTIC Science & Technology

    1992-11-01

    by ONR under contract ledge of transactions and a temporal data model. A N00014-91-J-l 102, by DOE, and by NOSC. multiversion data object is one...environment. Section 4 presents experimentations of priority-based synchronization algorithms and multiversion data objects using the prototyping environment...priority-based .yn- chronization algorithms and between a multiversion database and its corresponding single- version database, through the sensitivity

  5. How to select the best tree planting locations to enhance air pollution removal in the MillionTreesNYC initiative

    Treesearch

    Arianna Morani; David J. Nowak; Satoshi Hirabayashi; Carlo Calfapietra

    2011-01-01

    Highest priority zones for tree planting within New York City were selected by using a planting priority index developed combining three main indicators: pollution concentration, population density and low canopy cover. This new tree population was projected through time to estimate potential air quality and carbon bene!ts. Those trees will likely remove more than 10...

  6. Disseminating research in rural Yup'ik communities: challenges and ethical considerations in moving from discovery to intervention development.

    PubMed

    Rivkin, Inna; Trimble, Joseph; Lopez, Ellen D S; Johnson, Samuel; Orr, Eliza; Allen, James

    2013-01-01

    The native people of Alaska have experienced historical trauma and rapid changes in culture and lifestyle patterns. As a consequence, these populations shoulder a disproportionately high burden of psychological stress. The Yup'ik Experiences of Stress and Coping project originated from rural Yup'ik communities' concerns about stress and its effects on health. It aimed to understand the stressful experiences that affect Yup'ik communities, to identify coping strategies used to deal with these stressors and to inform culturally responsive interventions. Here, we examine the process of moving from research (gaining understanding) to disseminating project findings to translation into intervention priorities. We highlight the importance of community participation and discuss challenges encountered, strategies to address these challenges and ethical considerations for responsible intervention research with indigenous communities that reflect their unique historical and current socio-cultural realities. Community-wide presentations and discussions of research findings on stress and coping were followed by smaller Community Planning Group meetings. During these meetings, community members contextualized project findings and discussed implications for interventions. This process placed priority on community expertise in interpreting findings and translating results and community priorities into grant applications focused on intervention development and evaluation. Challenges included translation between English and Yup'ik, funding limitations and uncertainties, and the long timelines involved in moving from formative research to intervention in the face of urgent and evolving community needs. The lack of congruence between institutional and community worldviews in the intervention research enterprise highlights the need for "principled cultural sensitivity". Cultural sensitivity requires sharing results that have practical value, communicating openly, planning for sustainability and incorporating indigenous knowledge and expertise through a community-guided process. Our research findings will inform continued work within our partnership as we co-develop culturally based strategies for multilevel community interventions to address stress.

  7. Protect and Restore Lolo Creek Watershed, 2003-2004 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McRoberts, Heidi

    2004-06-01

    The Nez Perce Tribe Department of Fisheries Resource Management, Watershed Division approaches watershed restoration with a ridge-top to ridge-top approach. Watershed restoration projects within the Lolo Creek watershed are coordinated with the Clearwater National Forest and Potlatch Corporation. The Nez Perce Tribe began watershed restoration projects within the Lolo Creek watershed of the Clearwater River in 1996. Fencing to exclude cattle for stream banks, stream bank stabilization, decommissioning roads, and upgrading culverts are the primary focuses of this project. Riparian enhancement through planning of riparian trees continues. Culvert inventory is on-going and will be completed in 2004 for the entiremore » Lolo Creek drainage. High priority culverts are being replaced and passage blocking log culverts are being removed. Tribal crews completed maintenance to the previously built fence.« less

  8. Faculty development projects for international health professions educators: Vehicles for institutional change?

    PubMed

    Burdick, William P; Friedman, Stacey R; Diserens, Deborah

    2012-01-01

    Projects are an important tool in faculty development, and project emphasis may offer insights into perceived education priorities. Impact of projects has been focused on individuals, not institutions or health. Education innovation projects of Fellows in an international faculty development program were examined to better understand perceived needs in health professions education and institutional impact of projects. Four hundred and thirty-five projects were analyzed to identify focus areas. Fellows were asked to identify changes in their schools and communities resulting from their projects. New education methods and curriculum change were common project focus areas. Regional differences were evident with a higher percentage of education methods projects by Fellows residing in India (52%), compared with South Africa (25%) and Brazil (24%). Fifty-six percent of projects were incorporated into the curriculum and/or incorporated as institutional policy. One-third to two-thirds of respondents noted improved teaching quality, collaboration, education research interest, assessment, student performance, and curriculum alignment with community health needs. National differences in project focus may offer insight into local conditions and needs. High rates of diffusion of projects and impact on faculty, students, and curriculum suggest that faculty development projects may be a strategy for institutional change in resource limited environments.

  9. Global land cover mapping and characterization: present situation and future research priorities

    USGS Publications Warehouse

    Giri, Chandra

    2005-01-01

    The availability and accessibility of global land cover data sets plays an important role in many global change studies. The importance of such science‐based information is also reflected in a number of international, regional, and national projects and programs. Recent developments in earth observing satellite technology, information technology, computer hardware and software, and infrastructure development have helped developed better quality land cover data sets. As a result, such data sets are increasingly becoming available, the user‐base is ever widening, application areas have been expanding, and the potential of many other applications are enormous. Yet, we are far from producing high quality global land cover data sets. This paper examines the progress in the development of digital global land cover data, their availability, and current applications. Problems and opportunities are also explained. The overview sets the stage for identifying future research priorities needed for operational land cover assessment and monitoring.

  10. 34 CFR 388.22 - What priorities does the Secretary consider in making an award?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... education methods, such as interactive audio, video, computer technologies, or existing telecommunications... training materials and practices. The proposed project demonstrates an effective plan to develop and... programs by other State vocational rehabilitation units. (2) Distance education. The proposed project...

  11. 34 CFR 388.22 - What priorities does the Secretary consider in making an award?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... education methods, such as interactive audio, video, computer technologies, or existing telecommunications... training materials and practices. The proposed project demonstrates an effective plan to develop and... programs by other State vocational rehabilitation units. (2) Distance education. The proposed project...

  12. Task Management for Firefighters: A Practical Approach to Task Management.

    ERIC Educational Resources Information Center

    Roberts, Stephen S.

    1979-01-01

    A project management system for organizing requests from multiple departments and controlling the workload of the development/maintenance computer staff is described. Practical solutions to deciding project priorities, determining time estimates, creating positive peer pressure among programing staff, and formalizing information requests are…

  13. 78 FR 29234 - Final Priority; National Institute on Disability and Rehabilitation Research-Disability and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-20

    ... Institute on Disability and Rehabilitation Research--Disability and Rehabilitation Research Projects and... Center (RRTC) on Disability Statistics and Demographics under the Disability and Rehabilitation Research Projects and Centers program administered by the National Institute on Disability and Rehabilitation...

  14. 34 CFR 388.22 - What priorities does the Secretary consider in making an award?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... education methods, such as interactive audio, video, computer technologies, or existing telecommunications... training materials and practices. The proposed project demonstrates an effective plan to develop and... programs by other State vocational rehabilitation units. (2) Distance education. The proposed project...

  15. 34 CFR 388.22 - What priorities does the Secretary consider in making an award?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... education methods, such as interactive audio, video, computer technologies, or existing telecommunications... training materials and practices. The proposed project demonstrates an effective plan to develop and... programs by other State vocational rehabilitation units. (2) Distance education. The proposed project...

  16. 34 CFR 388.22 - What priorities does the Secretary consider in making an award?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... education methods, such as interactive audio, video, computer technologies, or existing telecommunications... training materials and practices. The proposed project demonstrates an effective plan to develop and... programs by other State vocational rehabilitation units. (2) Distance education. The proposed project...

  17. 78 FR 22780 - Final Priority; National Institute on Disability and Rehabilitation Research-Disability and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-17

    ... Institute on Disability and Rehabilitation Research--Disability and Rehabilitation Research Projects and Centers Program--Rehabilitation Engineering Research Centers AGENCY: Office of Special Education and... Research Center (RERC) on Hearing Enhancement under the Disability and Rehabilitation Research Projects and...

  18. US Climate Variability and Predictability Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patterson, Mike

    The US CLIVAR Project Office administers the US CLIVAR Program with its mission to advance understanding and prediction of climate variability and change across timescales with an emphasis on the role of the ocean and its interaction with other elements of the Earth system. The Project Office promotes and facilitates scientific collaboration within the US and international climate and Earth science communities, addressing priority topics from subseasonal to centennial climate variability and change; the global energy imbalance; the ocean’s role in climate, water, and carbon cycles; climate and weather extremes; and polar climate changes. This project provides essential one-year supportmore » of the Project Office, enabling the participation of US scientists in the meetings of the US CLIVAR bodies that guide scientific planning and implementation, including the scientific steering committee that establishes program goals and evaluates progress of activities to address them, the science team of funded investigators studying the ocean overturning circulation in the Atlantic, and two working groups tackling the priority research topics of Arctic change influence on midlatitude climate and weather extremes and the decadal-scale widening of the tropical belt.« less

  19. US Climate Variability and Predictability (CLIVAR) Project- Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patterson, Mike

    The US CLIVAR Project Office administers the US CLIVAR Program with its mission to advance understanding and prediction of climate variability and change across timescales with an emphasis on the role of the ocean and its interaction with other elements of the Earth system. The Project Office promotes and facilitates scientific collaboration within the US and international climate and Earth science communities, addressing priority topics from subseasonal to centennial climate variability and change; the global energy imbalance; the ocean’s role in climate, water, and carbon cycles; climate and weather extremes; and polar climate changes. This project provides essential one-year supportmore » of the Project Office, enabling the participation of US scientists in the meetings of the US CLIVAR bodies that guide scientific planning and implementation, including the scientific steering committee that establishes program goals and evaluates progress of activities to address them, the science team of funded investigators studying the ocean overturning circulation in the Atlantic, and two working groups tackling the priority research topics of Arctic change influence on midlatitude climate and weather extremes and the decadal-scale widening of the tropical belt.« less

  20. Educational affairs plan: A five-year strategy

    NASA Technical Reports Server (NTRS)

    1987-01-01

    A five-year plan is presented to guide the use of NASA resources in administering a focused and consistent set of aeronautics and space science education programs. Major initiatives outlined in this plan fall into two categories: programmatic priorities and institutional priorities. Programmatic priorities for this plan include elementary education, teacher education, underrepresented minority participation, educational technology and the Aerospace Education Services Project (AESP). Institutional priorities highlighted in this plan include university programs, educational publications and their distribution, educational partnerships with public and private organizations, educational research and evaluation, and activities of the educational affairs administration. The plan's aim is to directly and indirectly help to ensure an adequate pool of talented scientists, engineers and technical personnel to keep NASA at the forefront of advancements for the 21st century.

  1. Talking About The Smokes: a large-scale, community-based participatory research project.

    PubMed

    Couzos, Sophia; Nicholson, Anna K; Hunt, Jennifer M; Davey, Maureen E; May, Josephine K; Bennet, Pele T; Westphal, Darren W; Thomas, David P

    2015-06-01

    To describe the Talking About The Smokes (TATS) project according to the World Health Organization guiding principles for conducting community-based participatory research (PR) involving indigenous peoples, to assist others planning large-scale PR projects. The TATS project was initiated in Australia in 2010 as part of the International Tobacco Control Policy Evaluation Project, and surveyed a representative sample of 2522 Aboriginal and Torres Strait Islander adults to assess the impact of tobacco control policies. The PR process of the TATS project, which aimed to build partnerships to create equitable conditions for knowledge production, was mapped and summarised onto a framework adapted from the WHO principles. Processes describing consultation and approval, partnerships and research agreements, communication, funding, ethics and consent, data and benefits of the research. The TATS project involved baseline and follow-up surveys conducted in 34 Aboriginal community-controlled health services and one Torres Strait community. Consistent with the WHO PR principles, the TATS project built on community priorities and strengths through strategic partnerships from project inception, and demonstrated the value of research agreements and trusting relationships to foster shared decision making, capacity building and a commitment to Indigenous data ownership. Community-based PR methodology, by definition, needs adaptation to local settings and priorities. The TATS project demonstrates that large-scale research can be participatory, with strong Indigenous community engagement and benefits.

  2. Geocapabilities and Curriculum Leadership: Balancing the Priorities of Aim-Based and Knowledge-Led Curriculum Thinking in Schools

    ERIC Educational Resources Information Center

    Uhlenwinkel, Anke; Béneker, Tine; Bladh, Gabriel; Tani, Sirpa; Lambert, David

    2017-01-01

    The small-scale research presented in this paper was conducted as part of the GeoCapabilities project. Though originating in the Anglophone world, the project attempts to address the purposes and values of geography education internationally. Using the idea of "powerful disciplinary knowledge" the project asks what geography has to offer…

  3. GREAT (Groundwater Resources & Educational Activities for Teaching). An Iowa Project for Earth/Life/General Science, 7th-9th Grades.

    ERIC Educational Resources Information Center

    George, Gail, Ed.

    These resource materials are a part of a larger plan for groundwater education, as detailed in the Iowa Groundwater Education Strategy. The six units are arranged in priority order. The first unit covers the basics of groundwater and hydrogeology in Iowa. The other five units cover Iowa's groundwater issues in priority order, as outlined in the…

  4. Microgravity

    NASA Image and Video Library

    1998-09-30

    The Electrostatic Levitator (ESL) Facility established at Marshall Space Flight Center (MSFC) supports NASA's Microgravity Materials Science Research Program. NASA materials science investigations include ground-based, flight definition and flight projects. Flight definition projects, with demanding science concept review schedules, receive highest priority for scheduling experiment time in the Electrostatic Levitator (ESL) Facility.

  5. Consumer & Home Economics In-Service/Curriculum Development.

    ERIC Educational Resources Information Center

    McGillicuddy (Shirley) & Associates, Sierra Madre, CA.

    Mt. San Antonio Community College District's Consumer/Home Economics In-Service/Curriculum Development Project was designed to provide activities to meet staff development and program improvement needs. The choice of activities was based on evaluation data from previous home economics projects, and priorities identified by the Consumer/Home…

  6. Employment Priorities for the '90s for People with Disabilities.

    ERIC Educational Resources Information Center

    President's Committee on Employment of People with Disabilities, Washington, DC.

    This report resulted from a project designed to involve people with disabilities in the development of employment policies and rehabilitation services. The report presents recommendations addressing employment preparation, placement, postemployment, and support systems. The project, titled "National Agenda for the Employment of People with…

  7. 76 FR 78732 - FY 2011 Discretionary Funding Opportunity; Section 5309 Bus and Bus Facilities Veterans...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-19

    ... VTCLI supports the Obama Administration's priority of supporting America's veterans and military... Living Initiative Competitive Grant Program Funds: Announcement of Project Selections. SUMMARY: The U.S. Department of Transportation's (DOT) Federal Transit Administration (FTA) announces the selection of projects...

  8. Assessing Educational Needs in a Medical Specialty Society.

    ERIC Educational Resources Information Center

    Grosswald, Sarina J.; Bennof, Marvin J.

    1987-01-01

    The American College of Obstetricians and Gynecologists developed a needs assessment that provided a systematic approach to obtaining and reviewing data, identifying potential educational projects, and assigning project priorities. This paper describes that process, which incorporated use of a subcommittee, larger group process, and the Delphi…

  9. [Priority pollutants ranking and screening of coke industry based on USEtox model].

    PubMed

    Hao, Tian; Du, Peng-Fei; Du, Bin; Zeng, Si-Yu

    2014-01-01

    Thesis aims at evaluating and setting priority to human toxicity and ecotoxicity of coking pollutants. A field research and sampling project are conducted in coke plant in Shanxi so as to complete the coke emission inventory. The USEtox model representing recommended practice in LCIA characterization is applied to the emission inventory to quantify the potential impacts on human toxicity and ecotoxicity of emerging pollutants. Priority pollutants, production procedures and effects of changing plant site on the toxicity are analyzed. As conclusions, benzo(a) pyrene, benzene, Zn and As are identified as the priority pollutants in human toxicity, while pyrene and anthracene in ecotoxicity. Coal charging is the dominant procedure for organic toxicity and priority pollutants include benzo (a) pyrene, benzene, naphthalene, etc. While coke drenching is the dominant procedure for metal toxicity and priority pollutants include Zn, As, Ti, Hg etc. Emission to rural environment can reduce the organic toxicity significantly compared to the emission to urban environment. However, the site changing has no effect on metal toxicity and might increase the risk of the metal pollution to rural water and soil.

  10. Identification of critical factors affecting flexibility in hospital construction projects.

    PubMed

    Olsson, Nils E O; Hansen, Geir K

    2010-01-01

    This paper analyzes the dynamics relating to flexibility in a hospital project context. Three research questions are addressed: (1) When is flexibility used in the life cycle of a project? (2) What are the stakeholders' perspectives on project flexibility? And (3) What is the nature of the interaction between flexibility in the process of a project and flexibility in terms of the characteristics of a building? Flexibility is discussed from both a project management point of view and from a hospital architecture perspective. Flexibility in project life cycle and from a stakeholder perspective is examined, and the interaction between flexibility in scope lock-in and building flexibility is investigated. The results are based on case studies of four Norwegian hospital projects. Information relating to the projects has been obtained from evaluation reports, other relevant documents, and interviews. Observations were codified and analyzed based on selected parameters that represent different aspects of flexibility. One of the cases illustrates how late changes can have a significant negative impact on the project itself, contributing to delays and cost overruns. Another case illustrates that late scope lock-in on a limited part of the project, in this case related to medical equipment, can be done in a controlled manner. Project owners and users appear to have given flexibility high priority. Project management teams are less likely to embrace changes and late scope lock-in. Architects and consultants are important for translating program requirements into physical design. A highly flexible building did not stop some stakeholders from pushing for significant changes and extensions during construction.

  11. Accumulating Data to Optimally Predict Obesity Treatment (ADOPT) Core Measures: Psychosocial Domain.

    PubMed

    Sutin, Angelina R; Boutelle, Kerri; Czajkowski, Susan M; Epel, Elissa S; Green, Paige A; Hunter, Christine M; Rice, Elise L; Williams, David M; Young-Hyman, Deborah; Rothman, Alexander J

    2018-04-01

    Within the Accumulating Data to Optimally Predict obesity Treatment (ADOPT) Core Measures Project, the psychosocial domain addresses how psychosocial processes underlie the influence of obesity treatment strategies on weight loss and weight maintenance. The subgroup for the psychosocial domain identified an initial list of high-priority constructs and measures that ranged from relatively stable characteristics about the person (cognitive function, personality) to dynamic characteristics that may change over time (motivation, affect). This paper describes (a) how the psychosocial domain fits into the broader model of weight loss and weight maintenance as conceptualized by ADOPT; (b) the guiding principles used to select constructs and measures for recommendation; (c) the high-priority constructs recommended for inclusion; (d) domain-specific issues for advancing the science; and (e) recommendations for future research. The inclusion of similar measures across trials will help to better identify how psychosocial factors mediate and moderate the weight loss and weight maintenance process, facilitate research into dynamic interactions with factors in the other ADOPT domains, and ultimately improve the design and delivery of effective interventions. © 2018 The Obesity Society.

  12. Hydrogel research in Germany: the priority programme, Intelligent Hydrogels

    NASA Astrophysics Data System (ADS)

    Wallmersperger, Thomas; Sadowski, Gabriele

    2009-03-01

    The priority programme "Intelligent Hydrogels" was established by the German Research Foundation (DFG) in 2006 in order to strengthen the hydrogel-related research in Germany. The programme is being coordinated by Gabriele Sadowski, Technische Universität Dortmund. The aim of this priority programme is to develop new methods for the synthesis and characterization of smart hydrogels and to develop new modelling strategies in order to a) prepare the hydrogels for special applications and/or b) to develop and extend their capabilities for any desired use. In this programme, 73 scientists (36 professors and 37 scientific assistants/PhD students) from all over Germany are involved, working in 23 projects.

  13. Productivity of Spring Chinook Salmon and Summer Steelhead in the John Day River Basin, 2008 Annual Technical Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, Wayne H.; Schricker, Jaym'e; Ruzychi, James R.

    The John Day River subbasin supports one of the last remaining intact wild populations of spring Chinook salmon and summer steelhead in the Columbia River Basin. These populations remain depressed relative to historic levels and limited information is available for steelhead life history. Numerous habitat protection and rehabilitation projects have been implemented in the basin to improve salmonid freshwater production and survival. However, these projects often lack effectiveness monitoring. While our monitoring efforts outlined here will not specifically measure the effectiveness of any particular project, they will provide much needed programmatic or watershed (status and trend) information to help evaluatemore » project-specific effectiveness monitoring efforts as well as meet some data needs as index stocks. Our continued monitoring efforts to estimate salmonid smolt abundance, age structure, SAR, smolts/redd, freshwater habitat use, and distribution of critical life states will enable managers to assess the long-term effectiveness of habitat projects and to differentiate freshwater and ocean survival. Because Columbia Basin managers have identified the John Day subbasin spring Chinook population as an index population for assessing the effects of alternative future management actions on salmon stocks in the Columbia Basin (Schaller et al. 1999) we continue our ongoing studies. This project is high priority based on the level of emphasis by the NWPPC Fish and Wildlife Program, Independent Scientific Advisory Board (ISAB), Independent Scientific Review Panel (ISRP), NOAA National Marine Fisheries Service (NMFS), and the Oregon Plan for Salmon and Watersheds (OWEB). Each of these groups have placed priority on monitoring and evaluation to provide the real-time data to guide restoration and adaptive management in the region. The objective is to estimate smolt-to-adult survival rates (SAR) and out-migrant abundance for spring Chinook Oncorhynchus tshawytscha and summer steelhead O. mykiss and life history characteristics of summer steelhead.« less

  14. Managing distributed software development in the Virtual Astronomical Observatory

    NASA Astrophysics Data System (ADS)

    Evans, Janet D.; Plante, Raymond L.; Boneventura, Nina; Busko, Ivo; Cresitello-Dittmar, Mark; D'Abrusco, Raffaele; Doe, Stephen; Ebert, Rick; Laurino, Omar; Pevunova, Olga; Refsdal, Brian; Thomas, Brian

    2012-09-01

    The U.S. Virtual Astronomical Observatory (VAO) is a product-driven organization that provides new scientific research capabilities to the astronomical community. Software development for the VAO follows a lightweight framework that guides development of science applications and infrastructure. Challenges to be overcome include distributed development teams, part-time efforts, and highly constrained schedules. We describe the process we followed to conquer these challenges while developing Iris, the VAO application for analysis of 1-D astronomical spectral energy distributions (SEDs). Iris was successfully built and released in less than a year with a team distributed across four institutions. The project followed existing International Virtual Observatory Alliance inter-operability standards for spectral data and contributed a SED library as a by-product of the project. We emphasize lessons learned that will be folded into future development efforts. In our experience, a well-defined process that provides guidelines to ensure the project is cohesive and stays on track is key to success. Internal product deliveries with a planned test and feedback loop are critical. Release candidates are measured against use cases established early in the process, and provide the opportunity to assess priorities and make course corrections during development. Also key is the participation of a stakeholder such as a lead scientist who manages the technical questions, advises on priorities, and is actively involved as a lead tester. Finally, frequent scheduled communications (for example a bi-weekly tele-conference) assure issues are resolved quickly and the team is working toward a common vision.

  15. 76 FR 17629 - Applications for New Awards; Transition to Teaching Grant Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-30

    ... teachers in high-need schools operated by high-need local educational agencies (LEAs), including charter schools that operate as high-need LEAs. Priorities: This notice contains two competitive preference... Preference Priorities: Competitive Preference Priority 1 is from section 2313(c) of the Elementary and...

  16. Reservoir Stimulation Optimization with Operational Monitoring for Creation of EGS

    DOE Data Explorer

    Fernandez, Carlos A.

    2013-09-25

    EGS field projects have not sustained production at rates greater than ½ of what is needed for economic viability. The primary limitation that makes commercial EGS infeasible is our current inability to cost-effectively create high-permeability reservoirs from impermeable, igneous rock within the 3,000-10,000 ft depth range. Our goal is to develop a novel fracturing fluid technology that maximizes reservoir permeability while reducing stimulation cost and environmental impact. Laboratory equipment development to advance laboratory characterization/monitoring is also a priority of this project to study and optimize the physicochemical properties of these fracturing fluids in a range of reservoir conditions. Barrier G is the primarily intended GTO barrier to be addressed as well as support addressing barriers D, E and I.

  17. Reservoir Stimulation Optimization with Operational Monitoring for Creation of EGS

    DOE Data Explorer

    Carlos A. Fernandez

    2014-09-15

    EGS field projects have not sustained production at rates greater than ½ of what is needed for economic viability. The primary limitation that makes commercial EGS infeasible is our current inability to cost-effectively create high-permeability reservoirs from impermeable, igneous rock within the 3,000-10,000 ft depth range. Our goal is to develop a novel fracturing fluid technology that maximizes reservoir permeability while reducing stimulation cost and environmental impact. Laboratory equipment development to advance laboratory characterization/monitoring is also a priority of this project to study and optimize the physicochemical properties of these fracturing fluids in a range of reservoir conditions. Barrier G is the primarily intended GTO barrier to be addressed as well as support addressing barriers D, E and I.

  18. HL-LHC and HE-LHC Upgrade Plans and Opportunities for US Participation

    NASA Astrophysics Data System (ADS)

    Apollinari, Giorgio

    2017-01-01

    The US HEP community has identified the exploitation of physics opportunities at the High Luminosity-LHC (HL-LHC) as the highest near-term priority. Thanks to multi-year R&D programs, US National Laboratories and Universities have taken the leadership in the development of technical solutions to increase the LHC luminosity, enabling the HL-LHC Project and uniquely positioning this country to make critical contributions to the LHC luminosity upgrade. This talk will describe the shaping of the US Program to contribute in the next decade to HL-LHC through newly developed technologies such as Nb3Sn focusing magnets or superconducting crab cavities. The experience gained through the execution of the HL-LHC Project in the US will constitute a pool of knowledge and capabilities allowing further developments in the future. Opportunities for US participations in proposed hadron colliders, such as a possible High Energy-LHC (HE-LHC), will be described as well.

  19. The Licancabur Project: Exploring the Limits of Life in the Highest Lake on Earth as an Analog to Martian Paleolakes

    NASA Technical Reports Server (NTRS)

    Cabrol, N. A.; Grin, E. A.; McKay, C. P.; Friedmann, I.; Diaz, G. Chong; Demergasso, C.; Kisse, K.; Grigorszky, I.; Friedmann, R. Ocampo; Hock, A.

    2003-01-01

    The Licancabur volcano (6017 m) hosts the highest and one of the least explored lakes in the world in its summit crater. It is located 22 deg.50 min. South / 67 deg.53 min. West at the boundary of Chile and Bolivia in the High-Andes. In a freezing environment, the lake located in volcano-tectonic environment combines low-oxygen, low atmospheric pressure due to altitude, and high-UV radiation (see table). However, its bottom water temperature remains above 0 C year-round. These conditions make Licancabur a unique analog to Martian paleolakes considered high-priority sites for the search for life on Mars.

  20. Southern California Priority Corridor Showcase Program evaluation : Corridor-wide Rideshare Data Exchange Project evaluation report

    DOT National Transportation Integrated Search

    2004-11-01

    As required by federal law, all Intelligent Transportation System (ITS) projects that : receive federal funding must undergo an evaluation to help assess the costs and benefits : of ITS. This document is one of 23 reports produced as part of the Sout...

  1. 77 FR 17044 - Applications for New Awards; Strengthening Institutions Program (SIP)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-23

    ... 27637), and apply to the priorities in this notice: Carefully matched comparison group design means a... make when designing a carefully matched comparison group study. Applicants might want to consider...) or not to participate in the project (control group). The effect of the project is the average...

  2. 78 FR 49993 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-16

    ....regulations.gov : Follow online instructions for submitting comments. Email: Nefertiti DiCosmo, Remedial... [email protected] . Fax: Gladys Beard at (312) 697-2077. Mail: Nefertiti DiCosmo, Remedial Project... FURTHER INFORMATION CONTACT: Nefertiti DiCosmo, Remedial Project Manager, U.S. Environmental Protection...

  3. 76 FR 59395 - Notice of Webcast Meeting of the Environmental Financial Advisory Board (EFAB)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-26

    ... creative approaches to funding environmental programs, projects, and activities. The purpose of the meeting... priorities and to discuss progress with work projects under EFAB's current Strategic Action Agenda; and... topics expected to be discussed include: financing clean air technology; financing tribal environmental...

  4. Conservation priorities when species interact: the Noah's Ark metaphor revisited.

    PubMed

    Courtois, Pierre; Figuieres, Charles; Mulier, Chloé

    2014-01-01

    This note incorporates ecological interactions into the Noah's Ark problem. In doing so, we arrive at a general model for ranking in situ conservation projects accounting for species interrelations and provide an operational cost-effectiveness method for the selection of best preserving diversity projects under a limited budget constraint.

  5. Federal Research and Demonstration Programs Benefiting the Disadvantaged and Handicapped.

    ERIC Educational Resources Information Center

    1968

    Purpose, authority, applicant requirements, project deadlines, federal funding matching stipulations, program focus, 1968 priorities, and sources for information and guidelines are given for 23 programs and projects administered by the Federal Government. Included are those of the Office of Education, Social and Rehabilitation Service, and Public…

  6. Portraits of Partnership: The Hopes and Dreams Project

    ERIC Educational Resources Information Center

    Giovacco-Johnson, Tricia

    2009-01-01

    This article describes an innovative practice in family involvement developed by one early care and education center engaged in professional development. The Hopes and Dreams Project documented family involvement in children's lives and education through the pairing of pictures and narratives about their lives, histories, priorities, goals, and…

  7. 75 FR 17745 - Tribal Management Grant Program; Announcement Type: New and Competing Continuation Discretionary...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-07

    ... Points) A. Describe the organizational structure of the Tribe/Tribal organization beyond health care... Tribal Organizations.'' Priority II participation is only applicable to the Health Management Structure... will be issued under this grant program. Project Periods: Varies based on project type from one to...

  8. 77 FR 32612 - Proposed Priorities; Gaining Early Awareness and Readiness for Undergraduate Programs; College...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... authorizes GEAR UP program grantees to design projects that promote participating students' secondary school... regarding implementation of the project and surveys of students and parents about their participation in... student survey by the evaluator and about the release of designated ``directory information'' from the...

  9. From the ground up: aligning state freight plans to enhance state collaboration and establish regional and national harmonization of freight priorities.

    DOT National Transportation Integrated Search

    2016-08-01

    This project reviews MAFC state freight plans and current planning efforts and provides a catalogue of state practices, data and analysis techniques, stakeholder involvement and other planning elements. The project also identifies where states share ...

  10. 15 CFR 2301.4 - Types of projects and broadcast priorities.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... the objectives set forth at 47 U.S.C. 393(b), the Agency has developed the following categories. Each... nonbroadcast projects offering educational or instructional services). (b) Broadcast applications. The... telecommunications signal is distant when the geographical area to which the source is brought is beyond the grade B...

  11. 15 CFR 2301.4 - Types of projects and broadcast priorities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the objectives set forth at 47 U.S.C. 393(b), the Agency has developed the following categories. Each... nonbroadcast projects offering educational or instructional services). (b) Broadcast applications. The... telecommunications signal is distant when the geographical area to which the source is brought is beyond the grade B...

  12. 15 CFR 2301.4 - Types of projects and broadcast priorities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... the objectives set forth at 47 U.S.C. 393(b), the Agency has developed the following categories. Each... nonbroadcast projects offering educational or instructional services). (b) Broadcast applications. The... telecommunications signal is distant when the geographical area to which the source is brought is beyond the grade B...

  13. 15 CFR 2301.4 - Types of projects and broadcast priorities.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... the objectives set forth at 47 U.S.C. 393(b), the Agency has developed the following categories. Each... nonbroadcast projects offering educational or instructional services). (b) Broadcast applications. The... telecommunications signal is distant when the geographical area to which the source is brought is beyond the grade B...

  14. Involving healthcare professionals and family carers in setting research priorities for end-of-life care.

    PubMed

    Diffin, Janet; Spence, Michael; Spencer, Rebecca; Mellor, Peter; Grande, Gunn

    2017-02-02

    It is important to ensure regional variances are considered when setting future end-of-life research priorities, given the differing demographics and service provision. This project sought to identify end-of-life research priorities within Greater Manchester (United Kingdom). Following an initial scoping exercise, six topics within the 10 national priorities outlined by The Palliative and end-of-life care Priority Setting Partnership were selected for exploration. A workshop involving 32 healthcare professionals and a consultation process with 26 family carers was conducted. Healthcare professionals and carers selected and discussed the topics important to them. The topics selected most frequently by both healthcare professionals and carers were 'Access to 24 hour care', 'Planning end-of-life care in advance' and 'Staff and carer education'. Healthcare professionals also developed research questions for their topics of choice which were refined to incorporate carers' views. These questions are an important starting point for future end-of-life research within Greater Manchester.

  15. Young Children: Priority One. A Project Kit for Kiwanis Clubs--Addressing the Needs of Children, Prenatal through Age Five.

    ERIC Educational Resources Information Center

    Rice, C.; And Others

    This Kiwanis Club project kit contains ideas and instructions for implementing programs that meet local needs in the areas of maternal and infant health, child care and development, parenting, and safety and pediatric trauma. The kit begins with an overview that explains how to assess need and how to plan, implement, and evaluate a project. Tip…

  16. Family forest owners in the redwood region: management priorities and opportunities in a carbon market

    Treesearch

    Erin Clover Kelly; Joanna Di Tommaso; Arielle Weisgrau

    2017-01-01

    California’s cap-and-trade carbon market has included forest offset projects, available to all private landowners across the United States. The redwood region has been at the forefront of the market, creating the earliest forest carbon projects. From carbon registries, we compiled a database of all forest carbon projects in the market, in order to determine...

  17. Protect and Restore Lolo Creek Watershed, 2004-2005 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McRoberts, Heidi

    2005-12-01

    The Nez Perce Tribe Department of Fisheries Resource Management, Watershed Division approaches watershed restoration with a ridge-top to ridge-top approach. Watershed restoration projects within the Lolo Creek watershed are coordinated with the Clearwater National Forest and Potlatch Corporation. The Nez Perce Tribe began watershed restoration projects within the Lolo Creek watershed of the Clearwater River in 1996. Fencing to exclude cattle for stream banks, stream bank stabilization, decommissioning roads, and upgrading culverts are the primary focuses of this project. Riparian enhancement through planting of riparian trees and streambank bioengineering was completed. Culvert inventory was completed in 2004 on US Forestmore » Service and Potlatch Corporation lands in the Lolo Creek drainage. Two high priority culverts were replaced, and are now accessible for fish species. Four miles of road was decommissioned. Tribal crews completed maintenance to the previously built fence.« less

  18. Multi-copy entanglement purification with practical spontaneous parametric down conversion sources

    NASA Astrophysics Data System (ADS)

    Zhang, Shuai-Shuai; Shu, Qi; Zhou, Lan; Sheng, Yu-Bo

    2017-06-01

    Entanglement purification is to distill the high quality entanglement from the low quality entanglement with local operations and classical communications. It is one of the key technologies in long-distance quantum communication. We discuss an entanglement purification protocol (EPP) with spontaneous parametric down conversion (SPDC) sources, in contrast to previous EPP with multi-copy mixed states, which requires ideal entanglement sources. We show that the SPDC source is not an obstacle for purification, but can benefit the fidelity of the purified mixed state. This EPP works for linear optics and is feasible in current experiment technology. Project supported by the National Natural Science Foundation of China (Grant Nos. 11474168 and 61401222), the Natural Science Foundation of Jiangsu Province, China (Grant No. BK20151502), the Qing Lan Project in Jiangsu Province, China, and a Project Funded by the Priority Academic Program Development of Jiangsu Higher Education Institutions, China.

  19. Gulf of Mexico Initiative: NASA Capacity Building in the Gulf Region

    NASA Astrophysics Data System (ADS)

    Armstrong, D.; Graham, W. D.; Searby, N. D.

    2012-12-01

    In the wake of hurricanes Katrina and Rita, NASA created the Gulf of Mexico Initiative (GOMI) to help the region recover and to build the capacity of local and regional organizations to utilize NASA Earth science assets to establish effective policies, encourage sustainable natural resource management and utilization, and to expeditiously respond to crises. GOMI worked closely with the Gulf of Mexico Alliance (GOMA), a regional collaboration of the five US Gulf states and 13 federal agencies, to select projects that addressed high priority issues of the region. Many capabilities developed by this initiative have been adopted by end-users and have been leveraged to respond to other natural and man made disasters such as the Deepwater Horizon oil spill (2010), record breaking floods along the Mississippi River (2011), unprecedented tornado supercells (2011), and extreme drought (2012). Examples of successful capacity building projects will be presented and the lessons learned from these projects will be discussed.

  20. GEWEX Continental-scale International Project (GCIP)

    NASA Technical Reports Server (NTRS)

    Try, Paul

    1993-01-01

    The Global Energy and Water Cycle Experiment (GEWEX) represents the World Climate Research Program activities on clouds, radiation, and land-surface processes. The goal of the program is to reproduce and predict, by means of suitable models, the variations of the global hydrological regime and its impact on atmospheric and oceanic dynamics. However, GEWEX is also concerned with variations in regional hydrological processes and water resources and their response to changes in the environment such as increasing greenhouse gases. In fact, GEWEX contains a major new international project called the GEWEX Continental-scale International Project (GCIP), which is designed to bridge the gap between the small scales represented by hydrological models and those scales that are practical for predicting the regional impacts of climate change. The development and use of coupled mesoscale-hydrological models for this purpose is a high priority in GCIP. The objectives of GCIP are presented.

  1. The EEOC charge priority policy and claimants with psychiatric disabilities.

    PubMed

    Ullman, M D; Johnsen, M C; Moss, K; Burris, S

    2001-05-01

    In June 1995 the U.S. Equal Employment Opportunity Commission (EEOC) instituted a new charge priority policy. Under the new policy, charges are classified as one of three priority levels during or immediately after intake. Only charges assigned a high priority receive a full investigation. This paper examines the effect of the charge priority policy on individuals with psychiatric disabilities who filed Americans With Disabilities Act (ADA) charges with the EEOC. Using data extracted from the EEOC's charge data system, the authors analyzed all 66,298 ADA claims prioritized and closed between June 1995 and March 1998. The z test for difference in proportions and the generalized estimating equations procedure were used. The primary outcome measure was the priority assignment received by ADA claimants. Charges that received a high priority assignment were more likely to result in benefits for claimants. Charges filed by claimants with psychiatric disabilities were significantly less likely to be assigned a high priority than charges filed by other claimants. Claimants with psychiatric disabilities were also significantly less likely to benefit from their claims. The strong relationship between being assigned high priority and receiving benefits as a result of filing a charge demonstrates the importance of accurate priority categorization. The finding that people with psychiatric disabilities are less likely than others to benefit from their claims is cause for concern, particularly given the fact that the accuracy of the charge prioritization system has not been validated.

  2. Progress report for project modeling Arctic barrier island-lagoon system response to projected Arctic warming

    USGS Publications Warehouse

    Erikson, Li H.; Gibbs, Ann E.; Richmond, Bruce M.; Storlazzi, Curt; B.M. Jones,

    2012-01-01

    Changes in Arctic coastal ecosystems in response to global warming may be some of the most severe on the planet. A better understanding and analysis of the rates at which these changes are expected to occur over the coming decades is crucial in order to delineate high-priority areas that are likely to be affected by climate changes. In this study we investigate the likelihood of changes to habitat-supporting barrier island – lagoon systems in response to projected changes in atmospheric and oceanographic forcing associated with Arctic warming. To better understand the relative importance of processes responsible for the current and future coastal landscape, key parameters related to increasing arctic temperatures are investigated and used to establish boundary conditions for models that simulate barrier island migration and inundation of deltaic deposits and low-lying tundra. The modeling effort investigates the dominance and relative importance of physical processes shaping the modern Arctic coastline as well as decadal responses due to projected conditions out to the year 2100.

  3. The Role of Space Medicine in Management of Risk in Spaceflight

    NASA Technical Reports Server (NTRS)

    Clark, Jonathan B.

    2001-01-01

    The purpose of Space Medicine is to ensure mission success by providing quality and comprehensive health care throughout all mission phases to optimize crew health and performance and to prevent negative long-term health consequences. Space flight presents additional hazards and associated risks to crew health, performance, and safety. With an extended human presence in space it is expected that illness and injury will occur on orbit, which may present a significant threat to crew health and performance and to mission success. Maintaining crew health, safety and performance and preventing illness and injury are high priorities necessary for mission success and agency goals. Space flight health care should meet the standards of practice of evidence based clinical medicine. The function of Space Medicine is expected to meet the agency goals as stated in the 1998 NASA Strategic Plan and the priorities established by the Critical Path Roadmap Project. The Critical Path Roadmap Project is an integrated NASA cross-disciplinary strategy to assess, understand, mitigate, and manage the risks associated with long-term exposure to the space flight environment. The evidence based approach to space medicine should be standardized, objective process yielding expected results and establishing clinical practice standards while balancing individual risk with mission (programmatic) risk. The ability to methodically apply available knowledge and expertise to individual and mission health issues will ensure appropriate priorities are assigned and resources are allocated. NASA Space Medicine risk management process is a combined clinical and engineering approach. Competition for weight, power, volume, cost, and crew time must be balanced in making decisions about the care of individual crew with competing agency resources.

  4. Volunteered Geographic Information: Interpretation, Visualisation and Social Computing (VGIscience)

    NASA Astrophysics Data System (ADS)

    Burghardt, Dirk; Nejdl, Wolfgang; Schiewe, Jochen; Sester, Monika

    2018-05-01

    In the past years Volunteered Geographic Information (VGI) has emerged as a novel form of user-generated content, which involves active generation of geo-data for example in citizen science projects or during crisis mapping as well as the passive collection of data via the user's location-enabled mobile devices. In addition there are more and more sensors available that detect our environment with ever greater detail and dynamics. These data can be used for a variety of applications, not only for the solution of societal tasks such as in environment, health or transport fields, but also for the development of commercial products and services. The interpretation, visualisation and usage of such multi-source data is challenging because of the large heterogeneity, the differences in quality, the high update frequencies, the varying spatial-temporal resolution, subjective characteristics and low semantic structuring. Therefore the German Research Foundation has launched a priority programme for the next 3-6 years which will support interdisciplinary research projects. This priority programme aims to provide a scientific basis for raising the potential of VGI- and sensor data. Research questions described more in detail in this short paper span from the extraction of spatial information, to the visual analysis and knowledge presentation, taking into account the social context while collecting and using VGI.

  5. Constructing a Global Learning Partnership in Physiotherapy: An Ireland-Uganda Initiative.

    PubMed

    O'Sullivan, Cliona; Kazibwe, Herman; Whitehouse, Zillah; Blake, Catherine

    2017-01-01

    There is a strong correlation between disability and poverty and it is acknowledged that until disability issues are addressed, the goal of poverty reduction in low-income countries is unlikely to be achieved. Despite the high prevalence of disability in developing countries, there remains a significant shortage of rehabilitation professionals as highlighted by the WHO report, Human resources for Health (2006). The purpose of this project was to develop a collaborative and sustainable partnership to strengthen educational and research capacity in global health, disability, and rehabilitation between two physiotherapy schools; University College Dublin, Ireland, and Mbarara University of Science and Technology, Uganda. This article aims to describe the approach used and initial project outcomes. This project involved a bilateral visit to both institutions by two members of staff of respective physiotherapy programs. These visits entailed stakeholder meetings, clinical site visits, and workshops to identify the priorities for the partnership and shape the collaboration going forward. Appreciative inquiry methodology was used during the workshops and the four-dimensional framework for curriculum development was used to guide analysis and underpin findings. The key priorities identified were (i) development of joint global health learning initiative, (ii) to explore the possibility of postgraduate learning and research opportunities for Ugandan colleagues, and (iii) to develop joint clinical placements. The rationale and context and a plan of action is described. The project is ambitious and in order to be sustainable, the importance of long-term interinstitutional commitment and further funding cannot be ignored. This work provides a framework for other universities and institutions wishing to undertake similar activities. Such partnerships provide rich learning opportunities for students and health professionals and facilitate a deeper understanding of global health issues, social and cultural health determinants, and development of enhanced professional skills.

  6. Toward more realistic projections of soil carbon dynamics by Earth system models

    USGS Publications Warehouse

    Luo, Y.; Ahlström, Anders; Allison, Steven D.; Batjes, Niels H.; Brovkin, V.; Carvalhais, Nuno; Chappell, Adrian; Ciais, Philippe; Davidson, Eric A.; Finzi, Adien; Georgiou, Katerina; Guenet, Bertrand; Hararuk, Oleksandra; Harden, Jennifer; He, Yujie; Hopkins, Francesca; Jiang, L.; Koven, Charles; Jackson, Robert B.; Jones, Chris D.; Lara, M.; Liang, J.; McGuire, A. David; Parton, William; Peng, Changhui; Randerson, J.; Salazar, Alejandro; Sierra, Carlos A.; Smith, Matthew J.; Tian, Hanqin; Todd-Brown, Katherine E. O; Torn, Margaret S.; van Groenigen, Kees Jan; Wang, Ying; West, Tristram O.; Wei, Yaxing; Wieder, William R.; Xia, Jianyang; Xu, Xia; Xu, Xiaofeng; Zhou, T.

    2016-01-01

    Soil carbon (C) is a critical component of Earth system models (ESMs), and its diverse representations are a major source of the large spread across models in the terrestrial C sink from the third to fifth assessment reports of the Intergovernmental Panel on Climate Change (IPCC). Improving soil C projections is of a high priority for Earth system modeling in the future IPCC and other assessments. To achieve this goal, we suggest that (1) model structures should reflect real-world processes, (2) parameters should be calibrated to match model outputs with observations, and (3) external forcing variables should accurately prescribe the environmental conditions that soils experience. First, most soil C cycle models simulate C input from litter production and C release through decomposition. The latter process has traditionally been represented by first-order decay functions, regulated primarily by temperature, moisture, litter quality, and soil texture. While this formulation well captures macroscopic soil organic C (SOC) dynamics, better understanding is needed of their underlying mechanisms as related to microbial processes, depth-dependent environmental controls, and other processes that strongly affect soil C dynamics. Second, incomplete use of observations in model parameterization is a major cause of bias in soil C projections from ESMs. Optimal parameter calibration with both pool- and flux-based data sets through data assimilation is among the highest priorities for near-term research to reduce biases among ESMs. Third, external variables are represented inconsistently among ESMs, leading to differences in modeled soil C dynamics. We recommend the implementation of traceability analyses to identify how external variables and model parameterizations influence SOC dynamics in different ESMs. Overall, projections of the terrestrial C sink can be substantially improved when reliable data sets are available to select the most representative model structure, constrain parameters, and prescribe forcing fields.

  7. ‘Imi Hale – The Native Hawaiian Cancer Awareness, Research, and Training Network: Second-Year Status Report

    PubMed Central

    Braun, Kathryn L.; Tsark, JoAnn; Ann Santos, Lorrie; Abrigo, Lehua

    2010-01-01

    Purpose The purpose of this paper is to describe ‘Imi Hale, a program developed and managed by Native Hawaiians to increase cancer awareness and research capacity among Native Hawaiians. This US subgroup of indigenous people of the Hawaiian islands has disproportionately high rates of cancer mortality and low rates of participation in health and research careers. Methods As a community-based research project, ‘Imi Hale spent its first year gathering data from Native Hawaiians about their cancer awareness and research priorities. These findings guide ‘Imi Hale’s community and scientific advisors, a community-based Institutional Review Board, Na Liko Noelo (budding researchers), and staff in developing and carrying out projects that address these priority areas. Emphasis is placed on transferring skills and resources to Native Hawaiians through training, technical assistance, and mentorship. A biennial survey assesses the extent to which community-based participatory research principles are being followed. Principal Findings By the end of the second year, statewide and island-specific awareness plans were produced, and 9 funded awareness projects are supporting the development and dissemination of Hawaiian health education materials. Research accomplishments include the enrollment of 42 Native Hawaiian Na Liko Noelo (budding researchers), 22 of which are involved in 14 funded research projects. The biennial evaluation survey found that 92% of our advisors felt that ‘Imi Hale was promoting scientifically rigorous research that was culturally appropriate and respectful of Native Hawaiian beliefs, and 96% felt that ‘Imi Hale was following its own principles of community-based participatory research. Conclusion ‘Imi Hale’s community-based approach to promoting cancer awareness will result in a sustainable infrastructure for reducing the cancer burden on Native Hawaiians. PMID:15352771

  8. Research priorities by professional background - A detailed analysis of the James Lind Alliance Priority Setting Partnership.

    PubMed

    Arulkumaran, Nishkantha; Reay, Hannah; Brett, Stephen J

    2016-05-01

    The Intensive Care Foundation, in partnership with the James Lind Alliance, has supported a national project to identify and prioritise unanswered questions about adult intensive care that are important to people who have been critically ill, their families, and the health professionals who care for them. We conducted a secondary analysis to explore differences in priorities determined by different respondent groups in order to identify different groups' perceptions of gaps in knowledge. There were two surveys conducted as part of the original project. Survey 1 comprised a single open question to identify important research topics; survey 2 aimed to prioritise these topics using a 10-point Likert scale. In survey 1, despite clear differences in suggestions amongst the respondent groups, themes of comfort/communication and post-ICU rehabilitation were the within the top 2 suggestions across all groups. Patients and relatives suggested research topics to which they could easily relate, whereas there was a greater breadth of suggestions from clinicians. In survey 2, the number of research priorities that received a mode score of 10 varied from 1 to 36. Patients scored 36 out of the 37 topics with a mode score of 10. All other groups scored topics with more discrimination, with the number of topics with a mode score of 10 ranging from 1 to 20. Differences in the proportions of the representative groups are therefore unlikely to have translated to an impartial conclusion. Clinicians, patients, and family members have jointly identified the research priorities for UK ICM practice.

  9. Enhancing participatory approach in water resources management: development of a survey to evaluate stakeholders needs and priorities related to software capabilities

    NASA Astrophysics Data System (ADS)

    Foglia, L.; Rossetto, R.; Borsi, I.; Josef, S.; Boukalova, Z.; Triana, F.; Ghetta, M.; Sabbatini, T.; Bonari, E.; Cannata, M.; De Filippis, G.

    2016-12-01

    The EU H2020 FREEWAT project (FREE and open source software tools for WATer resource management) aims at simplifying the application of EU-water related Directives, by developing an open source and public domain, GIS-integrated platform for planning and management of ground- and surface-water resources. The FREEWAT platform is conceived as a canvas, where several distributed and physically-based simulation codes are virtually integrated. The choice of such codes was supported by the result of a survey performed by means of questionnaires distributed to 14 case study FREEWAT project partners and several stakeholders. This was performed in the first phase of the project within the WP 6 (Enhanced science and participatory approach evidence-based decision making), Task 6.1 (Definition of a "needs/tools" evaluation grid). About 30% among all the invited entities and institutions from several EU and non-EU Countries expressed their interest in contributing to the survey. Most of them were research institutions, government and geoenvironmental companies and river basin authorities.The result of the questionnaire provided a spectrum of needs and priorities of partners/stakeholders, which were addressed during the development phase of the FREEWAT platform. The main needs identified were related to ground- and surface-water quality, sustainable water management, interaction between groundwater/surface-water bodies, and design and management of Managed Aquifer Recharge schemes. Needs and priorities were then connected to the specific EU Directives and Regulations to be addressed.One of the main goals of the questionnaires was to collect information and suggestions regarding the use of existing commercial/open-source software tools to address needs and priorities, and regarding the needs to address specific water-related processes/problems.

  10. 2008 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    C. T. Lindsey; K. A. Gano

    2008-09-30

    The purpose of this report is to document the status of revegetation projects and natural resources mitigation efforts that have been conducted for remediated waste sites and other activities associated with the Comprehensive Environmental Response, Compensation, and Liability Act cleanup of National Priorities List waste sites at Hanford. This report documents the results of revegetation and mitigation monitoring conducted in 2008 and includes 22 revegetation/restoration projects, one revegetation/mitigation project, and two bat habitat mitigation projects.

  11. High-priority and low-priority drug-drug interactions in different international electronic health record systems: A comparative study.

    PubMed

    Cornu, Pieter; Phansalkar, Shobha; Seger, Diane L; Cho, Insook; Pontefract, Sarah; Robertson, Alexandra; Bates, David W; Slight, Sarah P

    2018-03-01

    To investigate whether alert warnings for high-priority and low-priority drug-drug interactions (DDIs) were present in five international electronic health record (EHR) systems, to compare and contrast the severity level assigned to them, and to establish the proportion of alerts that were overridden. We conducted a comparative, retrospective, multinational study using a convenience sample of 5 EHRs from the U.S., U.K., Republic of Korea and Belgium. Of the 15 previously defined, high-priority, class-based DDIs, alert warnings were found to exist for 11 in both the Korean and UK systems, 9 in the Belgian system, and all 15 in the two US systems. The specific combinations that were included in these class-based DDIs varied considerably in number, type and level of severity amongst systems. Alerts were only active for 8.4% (52/619) and 52.4% (111/212) of the specific drug-drug combinations contained in the Belgian and UK systems, respectively. Hard stops (not possible to override) existed in the US and UK systems only. The override rates for high-priority alerts requiring provider action ranged from 56.7% to 83.3%. Of the 33 previously defined low-priority DDIs, active alerts existed only in the US systems, for three class-based DDIs. The majority were non-interruptive. Alert warnings existed for most of the high-priority DDIs in the different EHRs but overriding them was easy in most of the systems. In addition to validating the high- and low-priority DDIs, this study reported a lack of standardization in DDI levels across different international knowledge bases. Copyright © 2017. Published by Elsevier B.V.

  12. Utilization of design data on conventional system to building information modeling (BIM)

    NASA Astrophysics Data System (ADS)

    Akbar, Boyke M.; Z. R., Dewi Larasati

    2017-11-01

    Nowadays infrastructure development becomes one of the main priorities in the developed country such as Indonesia. The use of conventional design system is considered no longer effectively support the infrastructure projects, especially for the high complexity building design, due to its fragmented system issues. BIM comes as one of the solutions in managing projects in an integrated manner. Despite of the all known BIM benefits, there are some obstacles on the migration process to BIM. The two main of the obstacles are; the BIM implementation unpreparedness of some project parties and a concerns to leave behind the existing database and create a new one on the BIM system. This paper discusses the utilization probabilities of the existing CAD data from the conventional design system for BIM system. The existing conventional CAD data's and BIM design system output was studied to examine compatibility issues between two subject and followed by an utilization scheme-strategy probabilities. The goal of this study is to add project parties' eagerness in migrating to BIM by maximizing the existing data utilization and hopefully could also increase BIM based project workflow quality.

  13. Modeling Primary Atomization of Liquid Fuels using a Multiphase DNS/LES Approach

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arienti, Marco; Oefelein, Joe; Doisneau, Francois

    2016-08-01

    As part of a Laboratory Directed Research and Development project, we are developing a modeling-and-simulation capability to study fuel direct injection in automotive engines. Predicting mixing and combustion at realistic conditions remains a challenging objective of energy science. And it is a research priority in Sandia’s mission-critical area of energy security, being also relevant to many flows in defense and climate. High-performance computing applied to this non-linear multi-scale problem is key to engine calculations with increased scientific reliability.

  14. Education Policy Initiatives To Address The Nurse Shortage In The United States

    PubMed Central

    Aiken, Linda H.; Cheung, Robyn B.; Olds, Danielle M.

    2009-01-01

    Employment opportunities are expected to grow much faster for registered nurses (RNs) than for most other occupations. Yet a major shortage of nurses is projected by 2020. A nurse faculty shortage and financially strapped colleges and universities are limiting the ability of U.S. nursing schools to take advantage of historically high numbers of qualified applicants. Increased public subsidies are needed to provide greater access to nursing education, with a priority on baccalaureate and graduate nursing education, where job growth is expected to be the greatest. PMID:19525285

  15. The priority group index: a proposed new method incorporating high risk and population burden to identify target populations for public health interventions.

    PubMed

    Zhang, Bo; Cohen, Joanna E; OʼConnor, Shawn

    2014-01-01

    Selection of priority groups is important for health interventions. However, no quantitative method has been developed. To develop a quantitative method to support the process of selecting priority groups for public health interventions based on both high risk and population health burden. Secondary data analysis of the 2010 Canadian Community Health Survey. Canadian population. Survey respondents. We identified priority groups for 3 diseases: heart disease, stroke, and chronic lower respiratory diseases. Three measures--prevalence, population counts, and adjusted odds ratios (OR)--were calculated for subpopulations (sociodemographic characteristics and other risk factors). A Priority Group Index (PGI) was calculated by summing the rank scores of these 3 measures. Of the 30 priority groups identified by the PGI (10 for each of the 3 disease outcomes), 7 were identified on the basis of high prevalence only, 5 based on population count only, 3 based on high OR only, and the remainder based on combinations of these. The identified priority groups were all in line with the literature as risk factors for the 3 diseases, such as elderly people for heart disease and stroke and those with low income for chronic lower respiratory diseases. The PGI was thus able to balance both high risk and population burden approaches in selecting priority groups, and thus it would address health inequities as well as disease burden in the overall population. The PGI is a quantitative method to select priority groups for public health interventions; it has the potential to enhance the effective use of limited public resources.

  16. Special Education and the Process of Change: Victim or Master of Educational Reform?

    ERIC Educational Resources Information Center

    Kaufman, Martin J.; And Others

    1990-01-01

    The article explores the process of change in special education and reviews major research projects of a five-year (1985-90) federal research program of the Department of Education's Office of Special Education Programs. Forty-one projects addressed eight priority areas, including enhancing instructional program options and educating students with…

  17. 76 FR 4894 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-27

    ... Drawing January 20, 2011. Lock Hydro Friends Fund XLI Project No. 13736-000 Allegheny 7 Hydro, LLC Project... Secretary of the Commission, or her designee, will, by random drawing, determine the filing priority for the two applicants identified in this notice. The drawing is open to the public and will be held in room...

  18. 76 FR 4893 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-27

    ... Drawing January 20, 2011. Lock Hydro Friends Fund XLIII Project No. 13745-000 FFP Missouri 14, LLC Project... Secretary of the Commission, or her designee, will, by random drawing, determine the filing priority for the three applicants identified in this notice. The drawing is open to the public and will be held in room...

  19. THE US MERCURY EMISSION INVENTORY FOR THE ARCTIC COUNCIL ACTION PLAN

    EPA Science Inventory

    The Arctic Council, having agreed to act to reduce exposures to a number of priority pollutants in the Arctic region, has initiated a mercury project via the Arctic Council Action Plan (ACAP). The project is led by the Danish EPA with a Steering Group from all eight Arctic count...

  20. THE US MERCURY EMISSION INVENTORY FOR THE ARCTIC COUNCIL ACTION PLAN

    EPA Science Inventory

    The Arctic Council, having agreed to act to reduce exposures to a number of priority pollutants in the Arctic region, has initiated a mercury project via the Arctic Council Plan (ACAP). The project is being led by the Danish EPA with a Steering Group from all eight Arctic coun...

  1. Conservation Priorities when Species Interact: The Noah's Ark Metaphor Revisited

    PubMed Central

    Courtois, Pierre; Figuieres, Charles; Mulier, Chloé

    2014-01-01

    This note incorporates ecological interactions into the Noah's Ark problem. In doing so, we arrive at a general model for ranking in situ conservation projects accounting for species interrelations and provide an operational cost-effectiveness method for the selection of best preserving diversity projects under a limited budget constraint. PMID:25181514

  2. Reducing Nutrients and Nutrient Impacts Priority Issue Team - St. Louis Bay Project: Implementing Nutrients PIT Action Step 1.1

    NASA Technical Reports Server (NTRS)

    Mason, Ted

    2011-01-01

    The NASA Applied Science & Technology Project Office at Stennis Space Center(SSC) used satellites, in-situ measurements and computational modeling to study relationships between water quality in St. Louis Bay, Mississippi and the watershed characteristics of the Jourdan and Wolf rivers from 2000-2010.

  3. The Role of Educational Technology in Upgrading Teacher Education in Pakistan.

    ERIC Educational Resources Information Center

    Abbasi, M. Hashim; Millar, Alex C.

    This paper outlines a joint Asian Bank/Pakistan Ministry of Education project designed to upgrade the state of teacher education and to improve the quality, status, and professional self-esteem of Pakistan's teachers. The main strategies identified by the Project for priority attention include: structural changes through the creation of four new…

  4. Finance Project. Status Report and Preliminary Working Papers.

    ERIC Educational Resources Information Center

    California Community Colleges, Sacramento. Office of the Chancellor.

    This status report outlines the progress of the California Community College Finance Project. Working papers, models, and alternative proposals are reviewed in four areas: mission and function, finance, governance, and management. Priorities in mission and function are stated in terms of the characteristics and educational needs of the nearly 1.3…

  5. Resource Development Opportunities for the Association of Leadership Educators: Phase One

    ERIC Educational Resources Information Center

    Noble, Donnette J.; Matesi, Lyna; Breen, Jennifer Moss; Horstmeier, Robin Peiter; Anderson, Dennis M.; Allen, Stuart; Pedigo, Leslie

    2016-01-01

    This application brief shares Phase One of an action research project for the Association of Leadership Educators. This project demonstrates how a member-based association can successfully engage its members in terms of identifying needs, defining strategic priorities, and detecting resource development opportunities. This body of work has various…

  6. School Buildings in Greece: The Bioclimatic Challenge and a Photovoltaic Pilot Project

    ERIC Educational Resources Information Center

    Patargias, Panagiotis A.; Angela, Kalianou; Galanis, George; Vassilopoulou, Marina; Drosou, Maria; Protogeropoulos, Christos

    2007-01-01

    Greece's School Buildings Organisation (SBO) is developing bioclimatic pilot schemes which are yielding positive results. Bioclimatic action has been one of the principal priorities of Greek school infrastructure planning since 2004. Among the activities undertaken by SBO to use renewable energy sources in school buildings is a pilot project to…

  7. 77 FR 11101 - Applications for New Awards; Native Hawaiian Education Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... designed to address the needs of at-risk children and youth. Competitive Preference Priority 2--Native Hawaiian Underemployment. (Up to 2 points). Projects that are designed to address needs in fields or... Instruction. (Up to 2 points). Projects that are designed to address the use of the Hawaiian language in...

  8. 77 FR 34359 - Applications for New Awards: Disability and Rehabilitation Research Projects and Centers Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... Projects and Centers Program; Traumatic Brain Injury Model Systems Centers AGENCY: Office of Special... Brain Injury Model Systems Centers (TBIMS). Notice inviting applications for new awards for fiscal year... 28, 2006 (71 FR 25472). The Traumatic Brain Injury Model Systems Centers priority is from the notice...

  9. 7 CFR 4279.155 - Loan priorities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... natural disaster or experiencing fundamental structural changes in its economic base (5 points). (iv... the maximum allowable for a loan of its size (5 points). (5) High impact business investment priorities. The priority score for high impact business investment will be the total score for the following...

  10. Libraries 2000: Allocation Plan for FY1995 LSCA Funds, Library Service and Construction Act. An Annual Outline and Description of Projects in Idaho Eligible under LSCA Titles I, II, and III.

    ERIC Educational Resources Information Center

    Idaho State Library, Boise.

    The Idaho allocation plan for funds from the Library Service and Construction Act continues the emphasis on priorities listed in fiscal year 1994 and those that were described in the statewide plan for the years 1994 through 1998. These priorities are: (1) advocate for the creation of library districts with adequate tax support to serve the…

  11. Libraries 2000: Allocation Plan for FY1997 LSCA Funds, Library Services and Construction Act. An Annual Outline and Description of Projects in Idaho Eligible under LSCA Titles I, II, and III.

    ERIC Educational Resources Information Center

    Idaho State Library, Boise.

    The Idaho allocation plan for funds from the Library Service and Construction Act (LSCA) continues the emphasis on priorities described in the statewide plan for years 1994-1998. These priorities are: (1) advocate for the creation of library districts with adequate tax support to serve the state's entire population; (2) strengthen cooperation and…

  12. Rapid research and implementation priority setting for wound care uncertainties.

    PubMed

    Gray, Trish A; Dumville, Jo C; Christie, Janice; Cullum, Nicky A

    2017-01-01

    People with complex wounds are more likely to be elderly, living with multimorbidity and wound related symptoms. A variety of products are available for managing complex wounds and a range of healthcare professionals are involved in wound care, yet there is a lack of good evidence to guide practice and services. These factors create uncertainty for those who deliver and those who manage wound care. Formal priority setting for research and implementation topics is needed to more accurately target the gaps in treatment and services. We solicited practitioner and manager uncertainties in wound care and held a priority setting workshop to facilitate a collaborative approach to prioritising wound care-related uncertainties. We recruited healthcare professionals who regularly cared for patients with complex wounds, were wound care specialists or managed wound care services. Participants submitted up to five wound care uncertainties in consultation with their colleagues, via an on-line survey and attended a priority setting workshop. Submitted uncertainties were collated, sorted and categorised according professional group. On the day of the workshop, participants were divided into four groups depending on their profession. Uncertainties submitted by their professional group were viewed, discussed and amended, prior to the first of three individual voting rounds. Participants cast up to ten votes for the uncertainties they judged as being high priority. Continuing in the professional groups, the top 10 uncertainties from each group were displayed, and the process was repeated. Groups were then brought together for a plenary session in which the final priorities were individually scored on a scale of 0-10 by participants. Priorities were ranked and results presented. Nominal group technique was used for generating the final uncertainties, voting and discussions. Thirty-three participants attended the workshop comprising; 10 specialist nurses, 10 district nurses, seven podiatrists and six managers. Participants had been qualified for a mean of 20.7 years with a mean of 16.8 years of wound care experience. One hundred and thirty-nine uncertainties were submitted electronically and a further 20 were identified on the day of the workshop following lively, interactive group discussions. Twenty-five uncertainties from the total of 159 generated made it to the final prioritised list. These included six of the 20 new uncertainties. The uncertainties varied in focus, but could be broadly categorised into three themes: service delivery and organisation, patient centred care and treatment options. Specialist nurses were more likely to vote for service delivery and organisation topics, podiatrists for patient centred topics, district nurses for treatment options and operational leads for a broad range. This collaborative priority setting project is the first to engage front-line clinicians in prioritising research and implementation topics in wound care. We have shown that it is feasible to conduct topic prioritisation in a short time frame. This project has demonstrated that with careful planning and rigor, important questions that are raised in the course of clinicians' daily decision making can be translated into meaningful research and implementation initiatives that could make a difference to service delivery and patient care.

  13. Rapid research and implementation priority setting for wound care uncertainties

    PubMed Central

    Dumville, Jo C.; Christie, Janice; Cullum, Nicky A.

    2017-01-01

    Introduction People with complex wounds are more likely to be elderly, living with multimorbidity and wound related symptoms. A variety of products are available for managing complex wounds and a range of healthcare professionals are involved in wound care, yet there is a lack of good evidence to guide practice and services. These factors create uncertainty for those who deliver and those who manage wound care. Formal priority setting for research and implementation topics is needed to more accurately target the gaps in treatment and services. We solicited practitioner and manager uncertainties in wound care and held a priority setting workshop to facilitate a collaborative approach to prioritising wound care-related uncertainties. Methods We recruited healthcare professionals who regularly cared for patients with complex wounds, were wound care specialists or managed wound care services. Participants submitted up to five wound care uncertainties in consultation with their colleagues, via an on-line survey and attended a priority setting workshop. Submitted uncertainties were collated, sorted and categorised according professional group. On the day of the workshop, participants were divided into four groups depending on their profession. Uncertainties submitted by their professional group were viewed, discussed and amended, prior to the first of three individual voting rounds. Participants cast up to ten votes for the uncertainties they judged as being high priority. Continuing in the professional groups, the top 10 uncertainties from each group were displayed, and the process was repeated. Groups were then brought together for a plenary session in which the final priorities were individually scored on a scale of 0–10 by participants. Priorities were ranked and results presented. Nominal group technique was used for generating the final uncertainties, voting and discussions. Results Thirty-three participants attended the workshop comprising; 10 specialist nurses, 10 district nurses, seven podiatrists and six managers. Participants had been qualified for a mean of 20.7 years with a mean of 16.8 years of wound care experience. One hundred and thirty-nine uncertainties were submitted electronically and a further 20 were identified on the day of the workshop following lively, interactive group discussions. Twenty-five uncertainties from the total of 159 generated made it to the final prioritised list. These included six of the 20 new uncertainties. The uncertainties varied in focus, but could be broadly categorised into three themes: service delivery and organisation, patient centred care and treatment options. Specialist nurses were more likely to vote for service delivery and organisation topics, podiatrists for patient centred topics, district nurses for treatment options and operational leads for a broad range. Conclusions This collaborative priority setting project is the first to engage front-line clinicians in prioritising research and implementation topics in wound care. We have shown that it is feasible to conduct topic prioritisation in a short time frame. This project has demonstrated that with careful planning and rigor, important questions that are raised in the course of clinicians’ daily decision making can be translated into meaningful research and implementation initiatives that could make a difference to service delivery and patient care. PMID:29206884

  14. Master Environmental Plan for Fort Devens, Massachusetts

    DTIC Science & Technology

    1992-04-01

    sites located in proximity to each other were grouped together. The rationale for the order of priority assigned to the study areas in this section is...following priority categories: 1. High priority for action. All group 1 study areas have known contamination. Group IA includes sites that have ongoing...remedial investigations. Group 1B includes sites that have ongoing site inspections. 2. Moderate to high priority for action. Study areas in groups 3

  15. 2007 River Corridor Closure Contractor Revegetation and Mitigation Monitoring Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    K. A. Gano; C. T. Lindsey

    2007-09-27

    The purpose of this report is to document the status of revegetation projects and natural resources mitigation efforts that have been conducted for remediated waste sites and other activities associated with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) cleanup of National Priorities List waste sites at Hanford. This report documents the results of revegetation and mitigation monitoring conducted in 2007 and includes 11 revegetation/restoration projects, one revegetation/mitigation project, and 3 bat habitat mitigation projects.

  16. Conflict-Aware Scheduling Algorithm

    NASA Technical Reports Server (NTRS)

    Wang, Yeou-Fang; Borden, Chester

    2006-01-01

    conflict-aware scheduling algorithm is being developed to help automate the allocation of NASA s Deep Space Network (DSN) antennas and equipment that are used to communicate with interplanetary scientific spacecraft. The current approach for scheduling DSN ground resources seeks to provide an equitable distribution of tracking services among the multiple scientific missions and is very labor intensive. Due to the large (and increasing) number of mission requests for DSN services, combined with technical and geometric constraints, the DSN is highly oversubscribed. To help automate the process, and reduce the DSN and spaceflight project labor effort required for initiating, maintaining, and negotiating schedules, a new scheduling algorithm is being developed. The scheduling algorithm generates a "conflict-aware" schedule, where all requests are scheduled based on a dynamic priority scheme. The conflict-aware scheduling algorithm allocates all requests for DSN tracking services while identifying and maintaining the conflicts to facilitate collaboration and negotiation between spaceflight missions. These contrast with traditional "conflict-free" scheduling algorithms that assign tracks that are not in conflict and mark the remainder as unscheduled. In the case where full schedule automation is desired (based on mission/event priorities, fairness, allocation rules, geometric constraints, and ground system capabilities/ constraints), a conflict-free schedule can easily be created from the conflict-aware schedule by removing lower priority items that are in conflict.

  17. Coordinating across scales: Building a regional marsh bird monitoring program from national and state Initiatives

    USGS Publications Warehouse

    Shriver, G.W.; Sauer, J.R.

    2008-01-01

    Salt marsh breeding bird populations (rails, bitterns, sparrows, etc.) in eastern North America are high conservation priorities in need of site specific and regional monitoring designed to detect population changes over time. The present status and trends of these species are unknown but anecdotal evidence of declines in many of the species has raised conservation concerns. Most of these species are listed as conservation priorities on comprehensive wildlife plans throughout the eastern U.S. National Wildlife Refuges, National Park Service units, and other wildlife conservation areas provide important salt marsh habitat. To meet management needs for these areas, and to assist regional conservation planning, survey designs are being developed to estimate abundance and population trends for these breeding bird species. The primary purpose of this project is to develop a hierarchical sampling frame for salt marsh birds in Bird Conservation Region (BCR) 30 that will provide the ability to estimate species population abundances on 1) specific sites (i.e. National Parks and National Wildlife Refuges), 2) within states or regions, and 3) within BCR 30. The entire breeding range of Saltmarsh Sharp-tailed and Coastal Plain Swamp sparrows are within BCR 30, providing an opportunity to detect population trends within the entire breeding ranges of two priority species.

  18. 76 FR 69246 - Application for New Awards; High School Equivalency Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-08

    ... could include, for example, participation in training on intensive science teaching techniques presented...)). The third priority is an invitational priority for applications that promote science, technology... preference over other applications. These priorities are: Invitational Priority 1--Science, Technology...

  19. Global priorities for conservation across multiple dimensions of mammalian diversity

    PubMed Central

    Graham, Catherine H.; Costa, Gabriel C.; Hedges, S. Blair; Penone, Caterina; Radeloff, Volker C.; Rondinini, Carlo; Davidson, Ana D.

    2017-01-01

    Conservation priorities that are based on species distribution, endemism, and vulnerability may underrepresent biologically unique species as well as their functional roles and evolutionary histories. To ensure that priorities are biologically comprehensive, multiple dimensions of diversity must be considered. Further, understanding how the different dimensions relate to one another spatially is important for conservation prioritization, but the relationship remains poorly understood. Here, we use spatial conservation planning to (i) identify and compare priority regions for global mammal conservation across three key dimensions of biodiversity—taxonomic, phylogenetic, and traits—and (ii) determine the overlap of these regions with the locations of threatened species and existing protected areas. We show that priority areas for mammal conservation exhibit low overlap across the three dimensions, highlighting the need for an integrative approach for biodiversity conservation. Additionally, currently protected areas poorly represent the three dimensions of mammalian biodiversity. We identify areas of high conservation priority among and across the dimensions that should receive special attention for expanding the global protected area network. These high-priority areas, combined with areas of high priority for other taxonomic groups and with social, economic, and political considerations, provide a biological foundation for future conservation planning efforts. PMID:28674013

  20. Global priorities for conservation across multiple dimensions of mammalian diversity.

    PubMed

    Brum, Fernanda T; Graham, Catherine H; Costa, Gabriel C; Hedges, S Blair; Penone, Caterina; Radeloff, Volker C; Rondinini, Carlo; Loyola, Rafael; Davidson, Ana D

    2017-07-18

    Conservation priorities that are based on species distribution, endemism, and vulnerability may underrepresent biologically unique species as well as their functional roles and evolutionary histories. To ensure that priorities are biologically comprehensive, multiple dimensions of diversity must be considered. Further, understanding how the different dimensions relate to one another spatially is important for conservation prioritization, but the relationship remains poorly understood. Here, we use spatial conservation planning to ( i ) identify and compare priority regions for global mammal conservation across three key dimensions of biodiversity-taxonomic, phylogenetic, and traits-and ( ii ) determine the overlap of these regions with the locations of threatened species and existing protected areas. We show that priority areas for mammal conservation exhibit low overlap across the three dimensions, highlighting the need for an integrative approach for biodiversity conservation. Additionally, currently protected areas poorly represent the three dimensions of mammalian biodiversity. We identify areas of high conservation priority among and across the dimensions that should receive special attention for expanding the global protected area network. These high-priority areas, combined with areas of high priority for other taxonomic groups and with social, economic, and political considerations, provide a biological foundation for future conservation planning efforts.

  1. Exploring the feasibility of Conjoint Analysis as a tool for prioritizing innovations for implementation

    PubMed Central

    2013-01-01

    Background In an era of scarce and competing priorities for implementation, choosing what to implement is a key decision point for many behavioural change projects. The values and attitudes of the professionals and managers involved inevitably impact the priority attached to decision options. Reliably capturing such values is challenging. Methods This paper presents an approach for capturing and incorporating professional values into the prioritization of healthcare innovations being considered for adoption. Conjoint Analysis (CA) was used in a single UK Primary Care Trust to measure the priorities of healthcare professionals working with women with postnatal depression. Rating-based CA data was gathered using a questionnaire and then mapped onto 12 interventions being considered as a means of improving the management of postnatal depression. Results The ‘impact on patient care’ and the ‘quality of supporting evidence’ associated with the potential innovations were the most influential in shaping priorities. Professionals were least influenced by whether an innovation was an existing national or local priority, or whether current practice in the Trust was meeting minimum standards. Ranking the 12 innovations by the preferences of potential adopters revealed ‘guided self help’ was the top priority for implementation and ‘screening questions for post natal depression’ the least. When other factors were considered (such as the presence of routine data or planned implementation activity elsewhere in the Trust), the project team chose to combine the eight related treatments and implement these as a single innovation referred to as ‘psychological therapies’. Conclusions Using Conjoint Analysis to prioritise potential innovation implementation options is a feasible means of capturing the utility of stakeholders and thus increasing the chances of an innovation being adopted. There are some practical barriers to overcome such as increasing response rates to conjoint surveys before routine and unevaluated use of this technique should be considered. PMID:23714429

  2. National Grants: 2012-2017 RFPs & Documents

    EPA Pesticide Factsheets

    Request for Proposals, project narrative sample, application fleet description sample, priority county list, sample drayage, model years for eligible nonroad engines, marine engine eligibility, frequently asked questions, and webinar slides

  3. National Grants: 2012-2018 RFPs & Documents

    EPA Pesticide Factsheets

    Request for Proposals, project narrative sample, application fleet description sample, priority county list, sample drayage, model years for eligible nonroad engines, marine engine eligibility, frequently asked questions, and webinar slides

  4. Assessing Progress, Impact, and Next Steps in Rolling Out Voluntary Medical Male Circumcision for HIV Prevention in 14 Priority Countries in Eastern and Southern Africa through 2014

    PubMed Central

    Kripke, Katharine; Samuelson, Julia; Schnure, Melissa; Dalal, Shona; Farley, Timothy; Hankins, Catherine; Thomas, Anne G.; Reed, Jason; Stegman, Peter; Bock, Naomi

    2016-01-01

    Background In 2007, the World Health Organization and the Joint United Nations Programme on HIV/AIDS (UNAIDS) identified 14 priority countries across eastern and southern Africa for scaling up voluntary medical male circumcision (VMMC) services. Several years into this effort, we reflect on progress. Methods Using the Decision Makers’ Program Planning Tool (DMPPT) 2.1, we assessed age-specific impact, cost-effectiveness, and coverage attributable to circumcisions performed through 2014. We also compared impact of actual progress to that of achieving 80% coverage among men ages 15–49 in 12 VMMC priority countries and Nyanza Province, Kenya. We populated the models with age-disaggregated VMMC service statistics and with population, mortality, and HIV incidence and prevalence projections exported from country-specific Spectrum/Goals files. We assumed each country achieved UNAIDS’ 90-90-90 treatment targets. Results More than 9 million VMMCs were conducted through 2014: 43% of the estimated 20.9 million VMMCs required to reach 80% coverage by the end of 2015. The model assumed each country reaches the UNAIDS targets, and projected that VMMCs conducted through 2014 will avert 240,000 infections by the end of 2025, compared to 1.1 million if each country had reached 80% coverage by the end of 2015. The median estimated cost per HIV infection averted was $4,400. Nyanza Province in Kenya, the 11 priority regions in Tanzania, and Uganda have reached or are approaching MC coverage targets among males ages 15–24, while coverage in other age groups is lower. Across all countries modeled, more than half of the projected HIV infections averted were attributable to circumcising 10- to 19-year-olds. Conclusions The priority countries have made considerable progress in VMMC scale-up, and VMMC remains a cost-effective strategy for epidemic impact, even assuming near-universal HIV diagnosis, treatment coverage, and viral suppression. Examining circumcision coverage by five-year age groups will inform countries’ decisions about next steps. PMID:27441648

  5. The Value of Linking Mitigation and Adaptation: A Case Study of Bangladesh

    NASA Astrophysics Data System (ADS)

    Ayers, Jessica M.; Huq, Saleemul

    2009-05-01

    There are two principal strategies for managing climate change risks: mitigation and adaptation. Until recently, mitigation and adaptation have been considered separately in both climate change science and policy. Mitigation has been treated as an issue for developed countries, which hold the greatest responsibility for climate change, while adaptation is seen as a priority for the South, where mitigative capacity is low and vulnerability is high. This conceptual divide has hindered progress against the achievement of the fundamental sustainable development challenges of climate change. Recent attention to exploring the synergies between mitigation and adaptation suggests that an integrated approach could go some way to bridging the gap between the development and adaptation priorities of the South and the need to achieve global engagement in mitigation. These issues are explored through a case study analysis of climate change policy and practice in Bangladesh. Using the example of waste-to-compost projects, a mitigation-adaptation-development nexus is demonstrated, as projects contribute to mitigation through reducing methane emissions; adaptation through soil improvement in drought-prone areas; and sustainable development, because poverty is exacerbated when climate change reduces the flows of ecosystem services. Further, linking adaptation to mitigation makes mitigation action more relevant to policymakers in Bangladesh, increasing engagement in the international climate change agenda in preparation for a post-Kyoto global strategy. This case study strengthens the argument that while combining mitigation and adaptation is not a magic bullet for climate policy, synergies, particularly at the project level, can contribute to the sustainable development goals of climate change and are worth exploring.

  6. The value of linking mitigation and adaptation: a case study of Bangladesh.

    PubMed

    Ayers, Jessica M; Huq, Saleemul

    2009-05-01

    There are two principal strategies for managing climate change risks: mitigation and adaptation. Until recently, mitigation and adaptation have been considered separately in both climate change science and policy. Mitigation has been treated as an issue for developed countries, which hold the greatest responsibility for climate change, while adaptation is seen as a priority for the South, where mitigative capacity is low and vulnerability is high. This conceptual divide has hindered progress against the achievement of the fundamental sustainable development challenges of climate change. Recent attention to exploring the synergies between mitigation and adaptation suggests that an integrated approach could go some way to bridging the gap between the development and adaptation priorities of the South and the need to achieve global engagement in mitigation. These issues are explored through a case study analysis of climate change policy and practice in Bangladesh. Using the example of waste-to-compost projects, a mitigation-adaptation-development nexus is demonstrated, as projects contribute to mitigation through reducing methane emissions; adaptation through soil improvement in drought-prone areas; and sustainable development, because poverty is exacerbated when climate change reduces the flows of ecosystem services. Further, linking adaptation to mitigation makes mitigation action more relevant to policymakers in Bangladesh, increasing engagement in the international climate change agenda in preparation for a post-Kyoto global strategy. This case study strengthens the argument that while combining mitigation and adaptation is not a magic bullet for climate policy, synergies, particularly at the project level, can contribute to the sustainable development goals of climate change and are worth exploring.

  7. Where There is No EMS: Lay Providers in Emergency Medical Services Care - EMS as a Public Health Priority.

    PubMed

    Debenham, Sierra; Fuller, Matthew; Stewart, Matthew; Price, Raymond R

    2017-12-01

    By 2030, road traffic accidents are projected to be the fifth leading cause of death worldwide, with 90% of these deaths occurring in low- and middle-income countries (LMICs). While high-quality, prehospital trauma care is crucial to reduce the number of trauma-related deaths, effective Emergency Medical Systems (EMS) are limited or absent in many LMICs. Although lay providers have long been recognized as the front lines of informal trauma care in countries without formal EMS, few efforts have been made to capitalize on these networks. We suggest that lay providers can become a strong foundation for nascent EMS through a four-fold approach: strengthening and expanding existing lay provider training programs; incentivizing lay providers; strengthening locally available first aid supply chains; and using technology to link lay provider networks. Debenham S , Fuller M , Stewart M , Price RR . Where there is no EMS: lay providers in Emergency Medical Services care - EMS as a public health priority. Prehosp Disaster Med. 2017;32(6):593-595.

  8. Crop expansion and conservation priorities in tropical countries.

    PubMed

    Phalan, Ben; Bertzky, Monika; Butchart, Stuart H M; Donald, Paul F; Scharlemann, Jörn P W; Stattersfield, Alison J; Balmford, Andrew

    2013-01-01

    Expansion of cropland in tropical countries is one of the principal causes of biodiversity loss, and threatens to undermine progress towards meeting the Aichi Biodiversity Targets. To understand this threat better, we analysed data on crop distribution and expansion in 128 tropical countries, assessed changes in area of the main crops and mapped overlaps between conservation priorities and cultivation potential. Rice was the single crop grown over the largest area, especially in tropical forest biomes. Cropland in tropical countries expanded by c. 48,000 km(2) per year from 1999-2008. The countries which added the greatest area of new cropland were Nigeria, Indonesia, Ethiopia, Sudan and Brazil. Soybeans and maize are the crops which expanded most in absolute area. Other crops with large increases included rice, sorghum, oil palm, beans, sugar cane, cow peas, wheat and cassava. Areas of high cultivation potential-while bearing in mind that political and socio-economic conditions can be as influential as biophysical ones-may be vulnerable to conversion in the future. These include some priority areas for biodiversity conservation in tropical countries (e.g., Frontier Forests and High Biodiversity Wilderness Areas), which have previously been identified as having 'low vulnerability', in particular in central Africa and northern Australia. There are also many other smaller areas which are important for biodiversity and which have high cultivation potential (e.g., in the fringes of the Amazon basin, in the Paraguayan Chaco, and in the savanna woodlands of the Sahel and East Africa). We highlight the urgent need for more effective sustainability standards and policies addressing both production and consumption of tropical commodities, including robust land-use planning in agricultural frontiers, establishment of new protected areas or REDD+ projects in places agriculture has not yet reached, and reduction or elimination of incentives for land-demanding bioenergy feedstocks.

  9. Shared research priorities for pessary use in women with prolapse: results from a James Lind Alliance Priority Setting Partnership

    PubMed Central

    Hagen, Suzanne; McClurg, Doreen; Pollock, Alex

    2018-01-01

    Objectives To identify the shared priorities for future research of women affected by and clinicians involved with pessary use for the management of prolapse. Design A priority setting project using a consensus method. Setting A James Lind Alliance Pessary use for prolapse Priority Setting Partnership (JLA Pessary PSP) conducted from May 2016 to September 2017 in the UK. Participants The PSP was run by a Steering Group of three women with experience of pessary use, three experienced clinicians involved with management of prolapse, two researchers with relevant experience, a JLA adviser and a PSP leader. Two surveys were conducted in 2016 and 2017. The first gathered questions about pessaries, and the second asked respondents to prioritise a list of questions. A final workshop was held on 8 September 2017 involving 10 women and 13 clinician representatives with prolapse and pessary experience. Results A top 10 list of priorities for future research in pessary use for prolapse was agreed by consensus. Conclusions Women with experience of pessary use and clinicians involved with prolapse management have worked together to determine shared priorities for future research. Aligning the top 10 results with existing research findings will highlight the gaps in current evidence and signpost future research to areas of priority. Effective dissemination of the results will enable research funding bodies to focus on gathering the evidence to answer the questions that matter most to those who will be affected. PMID:29705767

  10. Toward a comprehensive strategy for effective practitioner-scientist partnerships and larger-scale community health and well-being.

    PubMed

    Spoth, Richard L; Greenberg, Mark T

    2005-06-01

    This article articulates joint priorities for the fields of prevention science and community psychology. These priorities are intended to address issues raised by the frequent observation of natural tensions between community practitioners and scientists. The first priority is to expand the knowledge base on practitioner-scientist partnerships, particularly on factors associated with positive outcomes within communities. To further articulate this priority, the paper first discusses the rapid growth in community-based partnerships and the emergent research on them. Next described is an illustrative research project on a partnership model that links state university extension and public school delivery systems. The article then turns to the second, related priority of future capacity-building for diffusion of effective partnership-based interventions to achieve larger-scale health and well-being across communities. It outlines two salient tasks: clarification of a conceptual framework and the formulation of a comprehensive capacity-building strategy for diffusion. The comprehensive strategy would require careful attention to the expansion of networks of effective partnerships, partnership-based research agendas, and requisite policy-making.

  11. Projected changes in daily fire spread across Canada over the next century

    NASA Astrophysics Data System (ADS)

    Wang, Xianli; Parisien, Marc-André; Taylor, Steve W.; Candau, Jean-Noël; Stralberg, Diana; Marshall, Ginny A.; Little, John M.; Flannigan, Mike D.

    2017-02-01

    In the face of climate change, predicting and understanding future fire regimes across Canada is a high priority for wildland fire research and management. Due in large part to the difficulties in obtaining future daily fire weather projections, one of the major challenges in predicting future fire activity is to estimate how much of the change in weather potential could translate into on-the-ground fire spread. As a result, past studies have used monthly, annual, or multi-decadal weather projections to predict future fires, thereby sacrificing information relevant to day-to-day fire spread. Using climate projections from the fifth phase of the Coupled Model Intercomparison Project (CMIP5), historical weather observations, MODIS fire detection data, and the national fire database of Canada, this study investigated potential changes in the number of active burning days of wildfires by relating ‘spread days’ to patterns of daily fire-conducive weather. Results suggest that climate change over the next century may have significant impacts on fire spread days in almost all parts of Canada’s forested landmass; the number of fire spread days could experience a 2-to-3-fold increase under a high CO2 forcing scenario in eastern Canada, and a greater than 50% increase in western Canada, where the fire potential is already high. The change in future fire spread is critical in understanding fire regime changes, but is also imminently relevant to fire management operations and in fire risk mitigation.

  12. L'enseignement collegial: des priorities pour un renouveau de la formation. Rapport sur l'etat et les besoins de l'enseignement collegial. (College Education: Priorities for Renewal. Report on the Status and the Needs of College Education).

    ERIC Educational Resources Information Center

    Conseil des Colleges, Quebec (Quebec).

    Projections are provided in this report on the characteristics of Quebec society in the year 2000, direction that must be given to Quebec's community colleges' mission, and how college education should be organized and managed. First, a summary report, corresponding to the full-length report, is presented. Part 1, Quebec Society: Foreseeable…

  13. MANAGING INTERNAL RADIATION CONTAMINATION FOLLOWING AN EMERGENCY: IDENTIFICATION OF GAPS AND PRIORITIES

    PubMed Central

    Li, Chunsheng; Ansari, Armin; Etherington, George; Jourdain, Jean-Rene; Kukhta, Boris; Kurihara, Osamu; Lopez, Maria Antonia; Ménétrier, Florence; dos Reis, Arlene Alves; Solomon, Stephen; Zhang, Jiangfeng; Carr, Zhanat

    2017-01-01

    Following a radiological or nuclear emergency, first responders and the public may become internally contaminated with radioactive materials, as demonstrated during the Goiânia, Chernobyl and Fukushima accidents. Timely monitoring of the affected populations for potential internal contamination, assessment of radiation dose and the provision of necessary medical treatment are required to minimize the health risks from the contamination. This paper summarizes the guidelines and tools that have been developed, and identifies the gaps and priorities for future projects. PMID:27521210

  14. Vocational Education Trends and Priorities: A Study of Vocational Education in Missouri. Reaching for Excellence in Missouri Schools. A Collection of Reports and Other Documents Provided by Consultants and Staff of State Agencies under the Direction of the UMC Research Team.

    ERIC Educational Resources Information Center

    Missouri Univ., Columbia. Coll. of Education.

    As part of a multiphased study of trends and priorities in vocational education in Missouri, four project consultants were hired to write reports on labor market needs in Missouri, vocational education delivery systems in the state, and fiscal resources available for Missouri vocational education programs. These individual reports were synthesized…

  15. 75 FR 12221 - Foreign Language Assistance Program-Local Educational Agencies with Institutions of Higher Education

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-15

    ... design. We give preference to applications describing programs that meet any one of these priorities... students, or expanding to additional schools. (b) Quality of the project design. (60 points) The Secretary considers the quality of the design of the proposed project. In determining the quality of the design of the...

  16. The Boulder magnetic observatory

    USGS Publications Warehouse

    Love, Jeffrey J.; Finn, Carol A.; Pedrie, Kolby L.; Blum, Cletus C.

    2015-08-14

    The Boulder magnetic observatory has, since 1963, been operated by the Geomagnetism Program of the U.S. Geological Survey in accordance with Bureau and national priorities. Data from the observatory are used for a wide variety of scientific purposes, both pure and applied. The observatory also supports developmental projects within the Geomagnetism Program and collaborative projects with allied geophysical agencies.

  17. P.C.A.P. Project Profiles. Queensland Priority Country Area Program--Evaluation Series.

    ERIC Educational Resources Information Center

    Fowler, C. F.; Peters, J. E.

    Thirty-two projects designed to improve educational opportunities of rural Queensland children were funded as part of the Disadvantaged Schools Program in 1979 and 1980. This program resulted from a 1977-79 Schools Commission report which suggested that students in country areas may be disadvantaged compared to urban dwellers, with respect to…

  18. P.C.A.P. Project Profiles and General Profilles. Queensland Priority Country Area Program-Evaluation Series.

    ERIC Educational Resources Information Center

    Saide, Tom, Ed.

    Thirty-eight projects designed to improve educational opportunities of rural Queensland children were initiated in 1977 and funded through the Disadvantaged Schools Program; the program was renamed the Country Area Program and made a permanent School Commission program in 1982. The program resulted from a 1977-79 Schools Commission report…

  19. 77 FR 13317 - Riverbank Hydro No. 2, LLC, Lock+ Hydro Friends Fund XXXVI, Qualified Hydro 21, LLC; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14130-000, 14137-000, 14134-000] Riverbank Hydro No. 2, LLC, Lock+ Hydro Friends Fund XXXVI, Qualified Hydro 21, LLC; Notice... drawing, the order of priority is as follows: 1. Lock+ Hydro Friends Fund XXXVI: Project No. 14137-000. 2...

  20. 77 FR 12280 - Riverbank Hydro No. 1, LLC, Lock+ Hydro Friends Fund XXXVII; Qualified Hydro 20, LLC; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14131-000, 14138-00, 14135-000] Riverbank Hydro No. 1, LLC, Lock+ Hydro Friends Fund XXXVII; Qualified Hydro 20, LLC; Notice..., the order of priority is as follows: 1. Lock+ Hydro Friends Fund XXXVII, Project No. 14138-000. 2...

  1. 78 FR 30917 - FFP Project 116, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ..., LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 1, 2013, FFP Project 116, LLC filed an application for a... permit, if issued, is to grant the permit holder priority to file a license application during the permit...

  2. 78 FR 35020 - FFP Project 56, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-11

    ..., LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On February 1, 2013, FFP Project 56, LLC filed an application for a... priority to file a license application during the permit term. A preliminary permit does not authorize the...

  3. 78 FR 30916 - FFP Project 117, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ..., LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 1, 2013, FFP Project 117, LLC filed an application for a..., is to grant the permit holder priority to file a license application during the permit term. A...

  4. 78 FR 26360 - FFP Project 112, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-06

    ..., LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 1, 2013, FFP Project 112, LLC filed an application for a... preliminary permit, if issued, is to grant the permit holder priority to file a license application during the...

  5. 78 FR 41399 - FFP Project 133, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-10

    ..., LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On May 20, 2013, FFP Project 133, LLC filed an application for a... priority to file a license application during the permit term. A preliminary permit does not authorize the...

  6. 78 FR 30917 - FFP Project 115, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ..., LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On January 1, 2013, FFP Project 115, LLC filed an application for a... permit, if issued, is to grant the permit holder priority to file a license application during the permit...

  7. Oregon Small Schools Program: A Title III Project. Independent Evaluation Report, 1972.

    ERIC Educational Resources Information Center

    Miller, Donald F.

    An Elementary and Secondary Education Act (ESEA) Title III project, the 1971-72 Oregon Small Schools Program (OSSP) objectives were (1) to increase member schools receptivity to new and better ideas in education; (2) to implement new programs and apply new techniques consistent with the Oregon Board of Education priority objectives and with the…

  8. 75 FR 73054 - Office of Elementary and Secondary Education; Overview Information; High School Equivalency...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ...' participation in training on intensive science teaching techniques presented by a professionally credentialed...)). The third priority is an invitational priority for applications that promote science, technology... priorities are: Invitational Priority 1--Science, Technology, Engineering and Mathematics (STEM) Education...

  9. A Fair Contention Access Scheme for Low-Priority Traffic in Wireless Body Area Networks

    PubMed Central

    Sajeel, Muhammad; Bashir, Faisal; Asfand-e-yar, Muhammad; Tauqir, Muhammad

    2017-01-01

    Recently, wireless body area networks (WBANs) have attracted significant consideration in ubiquitous healthcare. A number of medium access control (MAC) protocols, primarily derived from the superframe structure of the IEEE 802.15.4, have been proposed in literature. These MAC protocols aim to provide quality of service (QoS) by prioritizing different traffic types in WBANs. A contention access period (CAP)with high contention in priority-based MAC protocols can result in higher number of collisions and retransmissions. During CAP, traffic classes with higher priority are dominant over low-priority traffic; this has led to starvation of low-priority traffic, thus adversely affecting WBAN throughput, delay, and energy consumption. Hence, this paper proposes a traffic-adaptive priority-based superframe structure that is able to reduce contention in the CAP period, and provides a fair chance for low-priority traffic. Simulation results in ns-3 demonstrate that the proposed MAC protocol, called traffic- adaptive priority-based MAC (TAP-MAC), achieves low energy consumption, high throughput, and low latency compared to the IEEE 802.15.4 standard, and the most recent priority-based MAC protocol, called priority-based MAC protocol (PA-MAC). PMID:28832495

  10. Accumulating Data to Optimally Predict Obesity Treatment (ADOPT): Recommendations from the Biological Domain.

    PubMed

    Rosenbaum, Michael; Agurs-Collins, Tanya; Bray, Molly S; Hall, Kevin D; Hopkins, Mark; Laughlin, Maren; MacLean, Paul S; Maruvada, Padma; Savage, Cary R; Small, Dana M; Stoeckel, Luke

    2018-04-01

    The responses to behavioral, pharmacological, or surgical obesity treatments are highly individualized. The Accumulating Data to Optimally Predict obesity Treatment (ADOPT) project provides a framework for how obesity researchers, working collectively, can generate the evidence base needed to guide the development of tailored, and potentially more effective, strategies for obesity treatment. The objective of the ADOPT biological domain subgroup is to create a list of high-priority biological measures for weight-loss studies that will advance the understanding of individual variability in response to adult obesity treatments. This list includes measures of body composition, energy homeostasis (energy intake and output), brain structure and function, and biomarkers, as well as biobanking procedures, which could feasibly be included in most, if not all, studies of obesity treatment. The recommended high-priority measures are selected to balance needs for sensitivity, specificity, and/or comprehensiveness with feasibility to achieve a commonality of usage and increase the breadth and impact of obesity research. The accumulation of data on key biological factors, along with behavioral, psychosocial, and environmental factors, can generate a more precise description of the interplay and synergy among them and their impact on treatment responses, which can ultimately inform the design and delivery of effective, tailored obesity treatments. © 2018 The Obesity Society.

  11. 2013 RFP Ports Initiative Supporting Documents

    EPA Pesticide Factsheets

    Documents include: RFPs, Project Narrative, Application fleet description (AFD), Priority County List, Model years for eligible nonroad engines (nonroad remaining useful life), Sample Drayage, Marince Engine Eligibility, FAQs, and Webinar slides

  12. 2014 RFP Ports Initiative Supporting Documents

    EPA Pesticide Factsheets

    Documents include: RFPs, Project Narrative, Application fleet description (AFD), Priority County List, Model years for eligible nonroad engines (nonroad remaining useful life), Sample Drayage, Marince Engine Eligibility, FAQs, and Webinar slides

  13. Priority setting for health technology assessments: a systematic review of current practical approaches.

    PubMed

    Noorani, Hussein Z; Husereau, Donald R; Boudreau, Rhonda; Skidmore, Becky

    2007-01-01

    This study sought to identify and compare various practical and current approaches of health technology assessment (HTA) priority setting. A literature search was performed across PubMed, MEDLINE, EMBASE, BIOSIS, and Cochrane. Given an earlier review conducted by European agencies (EUR-ASSESS project), the search was limited to literature indexed from 1996 onward. We also searched Web sites of HTA agencies as well as HTAi and ISTAHC conference abstracts. Agency representatives were contacted for information about their priority-setting processes. Reports on practical approaches selected through these sources were identified independently by two reviewers. A total of twelve current priority-setting frameworks from eleven agencies were identified. Ten countries were represented: Canada, Denmark, England, Hungary, Israel, Scotland, Spain, Sweden, The Netherlands, and United States. Fifty-nine unique HTA priority-setting criteria were divided into eleven categories (alternatives; budget impact; clinical impact; controversial nature of proposed technology; disease burden; economic impact; ethical, legal, or psychosocial implications; evidence; interest; timeliness of review; variation in rates of use). Differences across HTA agencies were found regarding procedures for categorizing, scoring, and weighing of policy criteria. Variability exists in the methods for priority setting of health technology assessment across HTA agencies. Quantitative rating methods and consideration of cost benefit for priority setting were seldom used. These study results will assist HTA agencies that are re-visiting or developing their prioritization methods.

  14. Priority service needs and receipt across the lifespan for individuals with autism spectrum disorder

    PubMed Central

    Lai, Jonathan K. Y.

    2017-01-01

    Abstract Individuals with Autism Spectrum Disorder (ASD) have a range of health, community, and social support needs across the lifespan that create age‐specific challenges in navigating service sectors. In this study, we set out to identify the priority needs of individuals with ASD across the lifespan, and the factors that predict receiving priority services. Participants included 3,317 individuals with ASD from a Canada‐wide online caregiver survey, stratified into five age groups (preschool, elementary school age, adolescence, emerging adulthood, adulthood). Priority receipt was calculated as a ratio of current services that corresponded to individualized priority need. Age‐stratified Poisson regression analyses were used to identify the sociodemographic, clinical and systemic predictors of priority receipt. Results indicate that the distribution of priority need varied by age, except for social skills programming, which was a high across all groups. The number of high and moderate priority needs diversified with age. Overall, 30% of individuals had none of their priority needs met and priority receipt decreased with age. Systemic factors were most consistently related to priority receipt across the lifespan. Understanding patterns and correlates of priority needs and use that currently exist in different age groups can inform policies to improve service access. Autism Res 2017, 10: 1436–1447. © 2017 International Society for Autism Research, Wiley Periodicals, Inc. PMID:28383156

  15. Development of a Catalytic Wet Air Oxidation Method to Produce Feedstock Gases from Waste Polymers

    NASA Technical Reports Server (NTRS)

    Kulis, Michael J.; Guerrero-Medina, Karen J.; Hepp, Aloysius F.

    2012-01-01

    Given the high cost of space launch, the repurposing of biological and plastic wastes to reduce the need for logistical support during long distance and long duration space missions has long been recognized as a high priority. Described in this paper are the preliminary efforts to develop a wet air oxidation system in order to produce fuels from waste polymers. Preliminary results of partial oxidation in near supercritical water conditions are presented. Inherent corrosion and salt precipitation are discussed as system design issues for a thorough assessment of a second generation wet air oxidation system. This work is currently being supported by the In-Situ Resource Utilization Project.

  16. Selection of priority investment projects for the development of the Russian Arctic

    NASA Astrophysics Data System (ADS)

    Novoselov, A.; Potravny, I.; Novoselova, I.; Gassiy, V.

    2017-12-01

    In the Russian Arctic, there is currently an active process of preparation and implementation of investment projects aiming to extract natural resources, with the aim of sustainable socioeconomic development of the region. These projects are associated with the development of key zones in the Arctic and involve the exploration for and production of minerals (diamonds, gold, rare-earth metals, oil, and gas) and the development of energy and infrastructure (e.g., the Northern Sea Route). Such projects, which are often carried out in territories of traditional nature management belonging to the indigenous peoples of the North, must consider their environmental and social responsibility and the preservation of the ethnic identity and culture of indigenous peoples. The extraction of mineral deposits in the Arctic and the Far North places new demands on subsoil users, related to the preservation and development of the socio-cultural environment of the indigenous peoples of the North and to the ecological rehabilitation of the area. This article presents economic and mathematical models for selecting the optimal development project options based on the pairwise comparison of investment projects and the evaluation of indigenous peoples' preferences. We investigated the investment projects' impact on traditional territories in the Arctic, including the Republic of Sakha (Yakutia), in terms of socioeconomic and ethnological development, and environmental change. The suggested system of models can be used to assess the priority of projects supporting and developing the region in the mining corporation's area of responsibility. The proposed models are based on fuzzy set theory, which provides an effective assessment of the population's preferences for projects. Data are processed using the hierarchy analysis method and multivariate optimization calculations to determine the project sets at different funding levels. The creation of information-linked processing models is innovative. Indigenous people's expert assessments of the priority of projects are processed using the hierarchy analysis method to determine the coefficients of the optimization model that enables the calculation of the choice between the analyzed projects, given the allocated financial resources. This approach can be used to address issues of support for indigenous people in areas where mining and other economic development activities are taking place, especially in the Arctic region. The proposed decision-making mechanism, which includes public hearings, sociological surveys, ethnological expertise, and compensation payments to indigenous minorities of the North, facilitates the justification of optimal strategies for maintaining and developing the region, taking into account economic, ecological, social, and ethnological factors.

  17. Spin depolarization dynamics of WSe2 bilayer

    NASA Astrophysics Data System (ADS)

    Niu, Binghui; Ye, Jialiang; Li, Ting; Li, Ying; Zhang, Xinhui

    2018-05-01

    Not Available Project supported by the National Natural Science Foundation of China (Grant No. 11474276) and the Strategic Priority Research Program of the Chinese Academy of Sciences (Grant No. XDPB0603).

  18. 7 CFR 1775.11 - Priority.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... be given only for factors that are well documented in the application package and, in the opinion of... defined and supported by data. (f) Projects containing evaluation methods that are specific to the...

  19. 34 CFR 1100.6 - What priorities may the Director establish?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... public awareness and understanding about literacy. (b) Expanding the use of technology in literacy... concerns, including health, welfare, the economy, and the well-being of children. Projects that enhance...

  20. 34 CFR 1100.6 - What priorities may the Director establish?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... public awareness and understanding about literacy. (b) Expanding the use of technology in literacy... concerns, including health, welfare, the economy, and the well-being of children. Projects that enhance...

Top