36. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...
36. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, June 1928 (original print located at Arizona Department of Transportation, Phoenix AZ) COMPLETION OF SOUTH ARM. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ
32. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...
32. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, April 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). CONSTRUCTION OF SOUTH ARM. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ
41. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...
41. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, 12 September 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). INSERTION OF CENTER PIN. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ
37. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...
37. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, ca. July 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). CONSTRUCTION ON THIRD PANEL OF NORTH ARM. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ
31. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...
31. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, April 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). INITIAL CONSTRUCTION ON SOUTH ARM. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ
40. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...
40. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, ca. July 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). CONSTRUCTION OF NORTH ARM, FROM SOUTH ARM. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ
34. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...
34. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, ca. May 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). CONSTRUCTION ON EIGHT PANEL OF SOUTH ARM. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ
33. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...
33. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, ca. May 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). CONSTRUCTION OF SOUTH ARM, SHOWING ERECTION TRAVELER. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ
38. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...
38. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, ca. July 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). VIEW FROM CANYON OF THIRD PANEL OF NORTH ARM UNDER CONSTRUCTION. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ
35. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...
35. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, June 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). ELEVENTH (LAST) PANEL OF SOUTH ARM UNDER CONSTRUCTION, SHOWING ERECTION TRAVELER. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ
39. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway ...
39. Photocopy of photograph, R.A. Hoffman, Bridge Engineer, Arizona Highway Department, photographer, ca. July 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). ASSEMBLY OF TRAVELER ON NORTH ARM, SHOWING TEMPORARY TIEBACKS AND ANCHORAGE ARMS. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ
Field performance of timber bridges. 6, Hoffman Run stress-laminated deck bridge
M. A. Ritter; P. D. Hilbrich Lee; G. J. Porter
The Hoffman Run bridge, located just outside Dahoga, Pennsylvania, was constructed in October 1990. The bridge is a simple-span, single-lane, stress-laminated deck superstructure that is approximately 26 ft long and 16 ft wide. It is the second stress-laminated timber bridge to be constructed of hardwood lumber in Pennsylvania. The performance of the bridge was...
ERIC Educational Resources Information Center
Scott, Daniel G.; Evans, Jessica
2010-01-01
This paper emerges from the continued analysis of data collected in a series of international studies concerning Childhood Peak Experiences (CPEs) based on developments in understanding peak experiences in Maslow's hierarchy of needs initiated by Dr Edward Hoffman. Bridging from the series of studies, Canadian researchers explore collected…
Installation Restoration Program Records Search for McChord Air Force Base, Washington.
1982-08-01
responsible for smoke testing for possi- ble outlets. g ŕ 115 0 V -j q * REFERENCES * .4 g SI * I w I WI j EU REFERENCES Brandin , R. M., and S. Sgt. S. A...Ms. R. Brandin . Griffin, W. C., et al. 1962. Water Resources of the Tacoma Area Washington. Geological Survey Water Supply Paper 1499-B. Prepared in...MEMBERS vS U STEVEN R. HOFFMAN Education B.S., Civil Engineering, South Dakota School of Mines and Technology, 1971 Experience - -. Mr. Hoffman is a
View of hammer nameplate (Chambersburg Engineering Company, Chambersburg, Penna USA) ...
View of hammer nameplate (Chambersburg Engineering Company, Chambersburg, Penna USA) and view north of Tony Talotta (heavy forger), Paul Azcharka (hammer operator), and Morty Hoffman (hammer operator helper) forging eyebolts. - Naval Base Philadelphia-Philadelphia Naval Shipyard, Structure Shop, League Island, Philadelphia, Philadelphia County, PA
STS-61 crew utilizing Virtual Reality in training for HST repair mission
1993-06-11
Astronaut Jeffrey A. Hoffman, one of four crewmembers for STS-61 that will conduct scheduled spacewalks during the flight, wears a special helmet and gloves designed to assist in proper positioning near the telescope while on the end of the robot arm. Crewmembers are utilizing a new virtual reality training aid which assists in refining positioning patterns for Space Shuttle Endeavour's Remote Manipulator System (RMS) (36890); Astronaut Claude Nicollier looks at a computer display of the Shuttle's robot arm movements as Thomas D. Akers and Kathryn C. Thornton, mission specialists look on. Nicollier will be responsible for maneuvering the astronauts while they stand in a foot restraint on the end of the RMS arm (36891,36894); Hoffman wears a special helmet and gloves designed to assist in proper positioning near the telescope while on the end of the robot arm (35892); Nicollier looks at a computer display of the Shuttle's robot arm movements as Akers looks on (36893); While (l-r) Astronauts Kenneth Bowersox, Kathryn Thornton, Richard O. Covey and Thomas D. Akers watch, Nicollier moves the Robot arm to desired locations in the Shuttle's payload bay using the Virtual Reality program (36895); Bowersox takes his turn maneuvering the RMS while mission specialist Hoffman, wearing the Virtual Reality helmet, follows his own progress on the end of the robot arm. Crewmembers participating during the training session are (l-r) Astronauts Akers, Hoffman, Bowersox, Nicollier, Covey, and Thornton. In the background, David Homan, an engineer in the JSC Engineering Directorate's Automation and Robotics Division, looks on (36896).
1977-07-01
Edward R, Hahn/MS-X22 Attn: Donald R. McMorrow/MS-G30 Attn: Samuel R. Crawford/MS-531 Ford Aerospace & Comm Operations Ford & Jamboree Roads...80933 Attn: Jerry I. Lubell Attn: Walter E. Ware Attn: John R. Hoffman Attn: Donald H. Bryce Attn: Albert P. Bridges Litton Systems, Inc...International Corp, P.O. Box 3105 Anaheim, CA 92803 Attn: George C. Messenger FB61 Attn: Donald J, Stevens FA70 Attn: K. F. Hull Attn: N. J
Study of Radiation-Hardened Quartz Production Processes
1977-02-09
Pittsfield MA 01201 3939 Fabian Way Attn: Joseph J. Reidl Palo Alto, CA 94303 Attn: Edward R. Hahn/MS-X22 General Electric Company Attn: Donald R. McMorrow...Goodwin/Mail 0452 Attn: John R. Hoffman Attn: B. T. Graham/MS PO-454 Attn: Donald H. Bryce Attn: Albert P. Bridges McDonnell Douglas Corp. P 0 Box 516Litton...03060 Attn: Moe L. Aitel NCA 1 3236 Texas Instruments, Inc. P. 0. Box Science Applications, Inc. Dallas, TX 75222 P.O. Box 2351 Attn: Donald J
Fields, Chris
2015-12-01
Does perception hide the truth? Information theory, computer science, and quantum theory all suggest that the answer is "yes." They suggest, indeed, that useful perception is only feasible because the truth can be hidden.
2007-03-01
mathematical frame- 1-6 work of linear algebra and functional analysis [122, 33], while Kalman-Bucy filtering [96, 32] is an especially important...Engineering, Air Force Institute of Technology (AU), Wright- Patterson AFB, Ohio, March 2002. 85. Hoffman, Kenneth and Ray Kunze. Linear Algebra (Second Edition...Engineering, Air Force Institute of Technology (AU), Wright- Patterson AFB, Ohio, December 1989. 189. Strang, Gilbert. Linear Algebra and Its Applications
130. Photographic copy of drawing (undated, original drawing in Archives, ...
130. Photographic copy of drawing (undated, original drawing in Archives, Public Affairs Department, Sears Merchandise Group, Hoffman Estates, Illinois). Engineer unknown. Full size. Pneumatic tube cartridges used at the time of the Plant closing. 4' PNEUMATIC TUBE SYSTEM - 11' LEATHER CARRIER - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL
131. Photographic copy of drawing (undated, original drawing in Archives, ...
131. Photographic copy of drawing (undated, original drawing in Archives, Public Affairs Department, Sears Merchandise Group, Hoffman Estates, Illinois). Engineer unknown. Full size. Pneumatic tube cartridges used at the time of the Plant closing. 4' PNEUMATIC TUBE SYSTEM - 11' LEATHER CARRIER - Sears Roebuck & Company Mail Order Plant, Merchandise Building, 924 South Homan Avenue, Chicago, Cook County, IL
Reverse engineering the human: artificial intelligence and acting theory
NASA Astrophysics Data System (ADS)
Soto-Morettini, Donna
2017-01-01
In two separate papers, Artificial Intelligence (AI)/Robotics researcher Guy Hoffman takes as a starting point that actors have been in the business of reverse engineering human behaviour for centuries. In this paper, I follow the similar trajectories of AI and acting theory (AT), looking at three primary questions, in the hope of framing a response to Hoffman's papers: (1) How are the problems of training a human to simulate a fictional human both similar to and different from training a machine to simulate a human? (2) How are the larger questions of AI design and architecture similar to the larger questions that still remain within the area of AT? (3) Is there anything in the work of AI design that might advance the work of acting theorists and practitioners? The paper explores the use of "swarm intelligence" in recent models of both AT and AI, and considers the issues of embodied cognition, and the kinds of intelligence that enhances or inhibits imaginative immersion for the actor, and concludes with a consideration of the ontological questions raised by the trend towards intersubjective, dynamic systems of generative thought in both AT and AI.
STS-35 MS Hoffman's height is recorded by MS Lounge on OV-102's middeck
NASA Technical Reports Server (NTRS)
1990-01-01
STS-35 Mission Specialist (MS) Jeffrey A. Hoffman stretches out on the middeck floor while MS John M. Lounge records his height. The two crewmembers are in front of the forward lockers aboard Columbia, Orbiter Vehicle (OV) 102. Hoffman steadies himself using the stowed treadmill and the lockers. Above Hoffman's head is a plastic bag filled with Development Test Objective (DTO) 634, Trash Compaction and Retention System Demonstration, trash compactor charcoal filtered bag lids.
Patrick, Renee B; Gibbs, John C
2007-06-01
The authors addressed whether parental expression of disappointment should be included as a distinct factor in M. L. Hoffman's well-established typology of parenting styles (induction, love withdrawal, power assertion). Hoffman's 3-factor model, along with a more inclusive 4-factor model (induction, love withdrawal, power assertion, and expressions of disappointment), were respectively evaluated in exploratory factor analyses. The analysis utilized extant data comprised of responses by children (N = 73) and their mothers (N = 67) to an adaptation of M. L. Hoffman and H. D. Saltzstein's parental discipline measure. The findings supported Hoffman's original model. Disappointment may be reducible to love withdrawal or induction, although disappointment may be a more appropriate induction for adolescents.
Involuntary Dissent: The Minority Voice of Translingual Life Writers
ERIC Educational Resources Information Center
Besemeres, Mary
2015-01-01
With reference to Eva Hoffman's Lost in Translation (1989) and four other texts I examine how translingual writers represent experiences of bringing what Hoffman calls 'terms from elsewhere' into dominant cultural dialogues. Alongside Hoffman's memoir I consider BulgarianFrench philosopher Tzvetan Todorov's "Bilinguisme, dialogisme et…
STS-35 MS Hoffman watches water egress exercises at JSC's WETF Bldg 29 pool
NASA Technical Reports Server (NTRS)
1990-01-01
STS-35 Mission Specialist (MS) Jeffrey A. Hoffman, wearing launch and entry suit (LES), comments on launch emergency egress procedures from the poolside of JSC's Weightless Environment Training Facility (WETF) Bldg 29. Hoffman awaits his turn to participate in the training activities.
ERIC Educational Resources Information Center
Proefriedt, William
1991-01-01
Reviews the autobiography of Eva Hoffman, "Lost in Translation: A Life in a New Language" (Dutton, 1989). Hoffman, whose family left Poland in the 1950s, offers a consciously bicultural view of the immigrant experience, in contrast to many autobiographies of those who forsake the old world for the new. (DM)
How Is Gender Self-Confidence Related to Subjective Well-Being?
ERIC Educational Resources Information Center
Hoffman, Rose Marie
2006-01-01
This study of ethnically diverse participants explored the relationship of gender self-confidence to subjective well-being. The 2 components of gender self-confidence (gender self-definition and gender self-acceptance) were assessed using the Hoffman Gender Scale (R. M. Hoffman, 1996; R. M. Hoffman, L. D. Borders, & J. A. Hattie, 2000). The…
STS-35 MS Hoffman's height is recorded by MS Lounge on OV-102's middeck
1990-12-10
STS035-19-021 (December 1990) --- STS-35 Mission Specialist Jeffrey A. Hoffman stretches out on the middeck floor while MS John M. (Mike) Lounge records his height. The two crew members are in front of the forward lockers aboard Columbia, Orbiter Vehicle (OV) 102. Hoffman steadies himself using the stowed treadmill and the lockers. Above Hoffman's head is a plastic bag filled with Development Test Objective (DTO) 634, Trash Compaction and Retention System Demonstration, trash compactor charcoal filtered bag lids. This image was selected by the Public Affairs Office (PAO) for public release.
STS-35 MS Hoffman operates ASTRO-1 MPC on OV-102's aft flight deck
1990-12-10
STS035-12-015 (2-11 Dec 1990) --- Astronaut Jeffrey A. Hoffman, STS 35 mission specialist, uses a manual pointing controller (MPC) for the Astro-1 mission's Instrument Pointing System (IPS). By using the MPC, Hoffman and other crewmembers on Columbia's aft flight deck, were able to command the IPS, located in the cargo bay, to record astronomical data. Hoffman is serving the "Blue" shift which complemented the currently sleeping "Red" shift of crewmembers as the mission collected scientific data on a 24-hour basis. The scene was photographed with a 35mm camera.
STS-35 MS Hoffman is suspended above pool during JSC water egress exercises
NASA Technical Reports Server (NTRS)
1990-01-01
STS-35 Mission Specialist (MS) Jeffrey A. Hoffman is suspended above pool during launch emergency egress procedures conducted in JSC's Weightless Environmental Training Facility Bldg 29. Hoffman, wearing a launch and entry suit (LES) and launch and entry helmet (LEH), adjusts flotation device (life jacket) as he is raised above the pool.
ERIC Educational Resources Information Center
Patrick, Renee B.; Gibbs, John C.
2007-01-01
The authors addressed whether parental expression of disappointment should be included as a distinct factor in M. L. Hoffman's (2000) well-established typology of parenting styles (induction, love withdrawal, power assertion). Hoffman's 3-factor model, along with a more inclusive 4-factor model (induction, love withdrawal, power assertion, and…
An arterio-venous bridge for gradual weaning from adult veno-arterial extracorporeal life support.
Babar, Z U D; Sharma, A S; Ganushchak, Y M; Delnoij, T S R; Donker, D W; Maessen, J G; Weerwind, P W
2015-11-01
Weaning from extracorporeal life support (ELS) is particularly challenging when cardiac recovery is slow, largely incomplete and hard to predict. Therefore, we describe an individualized gradual weaning strategy using an arterio-venous (AV) bridge incorporated into the circuit to facilitate weaning. Thirty adult patients weaned from veno-arterial ELS using an AV bridge were retrospectively analyzed. Serial echocardiography and hemodynamic monitoring were used to assess cardiac recovery and load responsiveness. Upon early signs of myocardial recovery, an AV bridge with an Hoffman clamp was added to the circuit and weaning was initiated. Support flow was reduced stepwise by 10-15% every 2 to 8 hours while the circuit flow was maintained at 3.5-4.5 L/min. The AV bridge facilitated gradual weaning in all 30 patients (median age: 66 [53-71] years; 21 males) over a median period of 25 [8-32] hours, with a median support duration of 96 [31-181] hours. During weaning, the median left ventricular ejection fraction was 25% [15-32] and the median velocity time integral of the aortic valve was 16 cm [10-23]. Through the weaning period, the mean arterial blood pressure was maintained at 70 mmHg and the activated partial thromboplastin time was 60 ± 10 seconds without additional systemic heparinization. Neither macroscopic thrombus formation in the ELS circuit during and after weaning nor clinically relevant thromboembolism was observed. Incorporation of an AV bridge for weaning from veno-arterial ELS is safe and feasible to gradually wean patients with functional cardiac recovery without compromising the circuit integrity. © The Author(s) 2015.
Virtual Reality: An Emerging Tool to Treat Pain
2010-04-01
burn patients, physical therapy stretching of the newly healing skin helps to counteract the healing skin’s natural contraction as it scars...room, and substitute more calming music and sound effects. The patient interacts with the virtual world, throwing snowballs at objects in the virtual...care (Hoffman, Patterson et al, 2008) and physical therapy (Hoffman, Patterson, Carrougher, 2000; Hoffman, Patterson, Carrougher, Sharar, 2001; Sharar
Astronaut Jeffrey Hoffman on RMS during third of five HST EVAs
1993-12-07
STS061-105-026 (7 Dec. 1993) --- Astronaut Jeffrey A. Hoffman signals directions to European Space Agency (ESA) astronaut Claude Nicollier, as the latter controls the Remote Manipulator System (RMS) arm during the third of five Extravehicular Activities (EVA) on the Hubble Space Telescope (HST) servicing mission. Astronauts Hoffman and F. Story Musgrave earlier changed out the Wide Field\\Planetary Camera (WF\\PC).
STS-46 ESA MS Nicollier and PLC Hoffman pose on OV-104's aft flight deck
NASA Technical Reports Server (NTRS)
1992-01-01
STS-46 European Space Agency (ESA) Mission Specialist (MS) Claude Nicollier (left) and MS and Payload Commander (PLC) Jeffrey A. Hoffman pose in front of the onorbit station controls on the aft flight deck of Atlantis, Orbiter Vehicle (OV) 104. The overhead windows W7 and W8 appear above their heads and the aft flight deck viewing windows W9 and W10 behind them. Hoffman and Nicollier have been training together for a dozen years at JSC. Hoffman was an astronaut candidate in 1978 and Nicollier accompanied a group of trainees in 1980. Note the partially devoured chocolate Space Shuttle floating near the two.
STS-35 MS Hoffman drains LES after water egress exercises in JSC's WETF
NASA Technical Reports Server (NTRS)
1990-01-01
STS-35 Mission Specialist (MS) Jeffrey A. Hoffman drains his launch and entry suit (LES) by propping himself upside down against a chair. Training personnel (left) and Pilot Guy S. Gardner watch as Hoffman's head stand forces water from his suit. Crewmembers were participating in launch emergency egress procedures in JSC's Weightless Environment Training Facility (WETF) Bldg 29. Various WETF mockups are visible in the background.
STS-61 air-bearing floor training in bldg 9N with Astronaut Jeff Hoffman
1993-06-07
S93-35696 (7 June 1993) --- Making use of the air-bearing floor in Johnson Space Center's (JSC) Shuttle Mockup and Integration Laboratory, astronaut Jeffrey A. Hoffman practices working with the Hubble Space Telescope's (HST) Wide Field/Planetary Camera (WF/PC). Hoffman is one of four mission specialists who will participate in HST servicing on the scheduled December mission. Changing out the large camera is one of several chores to be performed by the four. Photo credit: NASA
Astronauts Chang-Diaz, Hoffman and Nicollier eating in their sleep racks
1996-03-13
STS075-302-016 (22 Feb.-9 March 1996) --- Soon after reaching Earth orbit, the blue shift team set up what they referred to as a "formal" meal on the space shuttle Columbia's middeck. Left to right are astronauts Franklin R. Chang-Diaz, STS-75 payload commander; Jeffrey A. Hoffman and Claude Nicollier, both mission specialists. Hoffman later told a gathering of Johnson Space Center employees that the meal was accompanied by classical music. Photo credit: NASA or National Aeronautics and Space Administration
49 CFR 237.51 - Railroad bridge engineers.
Code of Federal Regulations, 2013 CFR
2013-10-01
... engineering work to be performed: (1) Determine the forces and stresses in railroad bridges and bridge... 49 Transportation 4 2013-10-01 2013-10-01 false Railroad bridge engineers. 237.51 Section 237.51 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION...
49 CFR 237.51 - Railroad bridge engineers.
Code of Federal Regulations, 2012 CFR
2012-10-01
... engineering work to be performed: (1) Determine the forces and stresses in railroad bridges and bridge... 49 Transportation 4 2012-10-01 2012-10-01 false Railroad bridge engineers. 237.51 Section 237.51 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION...
49 CFR 237.51 - Railroad bridge engineers.
Code of Federal Regulations, 2014 CFR
2014-10-01
... engineering work to be performed: (1) Determine the forces and stresses in railroad bridges and bridge... 49 Transportation 4 2014-10-01 2014-10-01 false Railroad bridge engineers. 237.51 Section 237.51 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION...
49 CFR 237.51 - Railroad bridge engineers.
Code of Federal Regulations, 2010 CFR
2010-10-01
... engineering work to be performed: (1) Determine the forces and stresses in railroad bridges and bridge... 49 Transportation 4 2010-10-01 2010-10-01 false Railroad bridge engineers. 237.51 Section 237.51 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION...
49 CFR 237.51 - Railroad bridge engineers.
Code of Federal Regulations, 2011 CFR
2011-10-01
... engineering work to be performed: (1) Determine the forces and stresses in railroad bridges and bridge... 49 Transportation 4 2011-10-01 2011-10-01 false Railroad bridge engineers. 237.51 Section 237.51 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL RAILROAD ADMINISTRATION...
Robert L. Smith; Robert J. Bush; Daniel L. Schmoldt
1995-01-01
Bridge design engineers and local highway officials make bridge replacement decisions across the United States. The Analytical Hierarchy Process was used to characterize the bridge material selection decision of these individuals. State Department of Transportation engineers, private consulting engineers, and local highway officials were personally interviewed in...
... DD. Hydrocarbons. In: Nelson LS, Lewin NA, Howland MA, Hoffman RS, Goldfrank LR, Flomenbaum NE, eds. Goldfrank's ... Dermatologic principles. In: Nelson LS, Lewin NA, Howland MA, Hoffman RS, Goldfrank LR, Flomenbaum NE, eds. Goldfrank's ...
A Literature Review of Processes for Gravel Deposit Identification in the Lower Mississippi River
2010-07-01
deposits. ERDC/GSL SR-10-2 35 References Anstee, J. M., D . L. B. Jupp, and G. T. Byrne. 1997. The shallow benthic cover map and optical water ...Engineers. Biedenharn, D . S., L. C. Hubbard, and P . H. Hoffman. 2000. Historical analysis of dike systems on the lower Mississippi River...Systems Science and Policy. Seaside, CA: California State University, Monterey Bay. Lagasse, P . F., B. R. Winkley, and D . B. Simons. 1980. Impact of
Structural characterization of UHPC waffle bridge deck and connections.
DOT National Transportation Integrated Search
2014-07-01
The AASHTO strategic plan in 2005 for bridge engineering identified extending the service life of bridges and accelerating bridge : construction as two of the grand challenges in bridge engineering. These challenges have the objective of producing sa...
STS-35 MS Hoffman and MS Parker on the middeck of Columbia, OV-102
1990-12-10
STS035-49-029 (2-10 Dec 1990) --- Posing on the middeck of Columbia, Orbiter Vehicle (OV) 102, are Mission Specialist (MS) Jeffrey A. Hoffman (mustache) and MS Robert A. R. Parker. Determining who is right side up is complicated by the microgravity of space. Hoffman's head is at the middeck floor and his feet are at the ceiling. The two crewmembers are in front of OV-102's port side with the waste collection system (WCS) contingency unit, side hatch, and galley visible behind them.
DOT National Transportation Integrated Search
2013-09-01
The mission of Rutgers Universitys Center for Advanced Infrastructure and Transportation (CAIT) Bridge Resource Program (BRP) is to provide bridge engineering support to the New Jersey Department of Transportation (NJDOT)s Bridge Engineering an...
Detail of Bright Angel stone vault, containing condenser, Hoffman condensation ...
Detail of Bright Angel stone vault, containing condenser, Hoffman condensation pump, Jennings vacuum heating pump, and misc. pipes and valves. - Grand Canyon Village Utilities, Grand Canyon National Park, Grand Canyon Village, Coconino County, AZ
Astronauts Hoffman and Seddon demonstrate effect of weightlessness on slinky
1985-04-14
51D-06-015 (12-19 April 1985) --- Astronaut Jeffrey A. Hoffman and Rhea Seddon mission specialists, demonstrate the effect of weightlessness on a slinky toy in the mid-deck of the Space Shuttle Discovery.
A forecast of bridge engineering, 1980-2000.
DOT National Transportation Integrated Search
1979-01-01
A three-pronged study was undertaken to forecast the nature of bridge engineering and construction for the years 1980 to 2000. First, the history of bridge engineering was explored to extrapolate likely future developments. Second, a detailed questio...
DOT National Transportation Integrated Search
1993-03-01
The transition from the roadway to the deck of a rigidly supported bridge is of concern to engineers and the travelling public. It is a common occurrence to feel a discontinuity between the roadway and bridge structure. Bridge engineers have tried to...
Comment on Hoffman and Rovine (2007): SPSS MIXED can estimate models with heterogeneous variances.
Weaver, Bruce; Black, Ryan A
2015-06-01
Hoffman and Rovine (Behavior Research Methods, 39:101-117, 2007) have provided a very nice overview of how multilevel models can be useful to experimental psychologists. They included two illustrative examples and provided both SAS and SPSS commands for estimating the models they reported. However, upon examining the SPSS syntax for the models reported in their Table 3, we found no syntax for models 2B and 3B, both of which have heterogeneous error variances. Instead, there is syntax that estimates similar models with homogeneous error variances and a comment stating that SPSS does not allow heterogeneous errors. But that is not correct. We provide SPSS MIXED commands to estimate models 2B and 3B with heterogeneous error variances and obtain results nearly identical to those reported by Hoffman and Rovine in their Table 3. Therefore, contrary to the comment in Hoffman and Rovine's syntax file, SPSS MIXED can estimate models with heterogeneous error variances.
STS-46 MS PLC Hoffman floats in life raft during water egress training at JSC
NASA Technical Reports Server (NTRS)
1992-01-01
STS-46 Atlantis, Orbiter Vehicle (OV) 104, Mission Specialist (MS) and Payload Commander Jeffrey A. Hoffman floats in a one-person life raft during launch emergency egress (bailout) simulation conducted in JSC's Weightless Environment Training Facility (WETF) Bldg 29 pool. Hoffman, who has just tumbled out a side hatch mockup, waits for his life raft to fully inflate as a SCUBA-equipped diver looks on. The long cylindrical object in the foreground serves as a prop for the crew escape system (CES) pole. In the background MS Franklin R. Chang-Diaz floats in a fully inflated life raft.
Review on antibacterial characteristics of bridge engineering biomaterials.
Zhao, Qing-Qing; Chen, Meng-Yao; He, Rui-Lin; Zhang, Zhong-Feng; Ashraf, Muhammad Aqeel
2016-01-01
This review summarizes the research on timber construction materials used in bridge construction. It focuses on the application of antiseptic treatments and the use of timber engineering materials in decks and bridges. This review also provides an overview on the future research and prospects of engineered timber materials.
Using expert opinion to quantify accuracy and reliability of nondestructive evaluation on bridges.
DOT National Transportation Integrated Search
2015-08-01
Bridge inspection is an important phase in bridge management. In 2009, a joint American Society of Civil : Engineers Structural Engineering Institute and AASHTO Ad-Hoc group was created to identify the issues : in bridge safety and to study current b...
Photographic copy of drawing by Modjeski and Masters, Engineers of ...
Photographic copy of drawing by Modjeski and Masters, Engineers of the proposed Huey P. Long Bridge Widening. Original drawing located in the office of Modjeski and Masters, Consulting Engineers at 1055 St. Charles Avenue, New Orleans, LA. 70130. MAY 13, 2005 DRAWING OF THE PROPOSED HUEY P. LONG BRIDGE WIDENING, U.S. 90, MAIN BRIDGE SUBSTRUCTURE, SHOWING STRUCTURE PLAN AND ELEVATION -2 AND TYPICAL SECTION THROUGH BRIDGE. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA
Cross-Cultural Differences in Childrearing Goals.
ERIC Educational Resources Information Center
Hoffman, Lois Wladis
1988-01-01
Data from eight countries were analyzed to explore hypotheses about cross-cultural differences in childrearing patterns. Particular attention is given to LeVine's and Kohn's theories, and Hoffman and Hoffman's new theory that contends that children satisfy certain parental needs and that the satisfaction of specific needs affects parents'…
The Nature of the Terrorism Threat
ERIC Educational Resources Information Center
Goldstein, Evan R., Comp.
2008-01-01
This article describes how Bruce Hoffman and Marc Sageman, two prominent scholars of terrorism, square off over whether Al Qaeda remains the primary global terrorist threat. The dispute began in the pages of "Foreign Affairs," where Hoffman, a professor in the security-studies program at Georgetown University, wrote a withering review of…
"Hoffman v. Monsanto": Courts, Class Actions, and Perceptions of the Problem of GM Drift
ERIC Educational Resources Information Center
McLeod-Kilmurray, Heather
2007-01-01
"Hoffman v. Monsanto" raises questions about the civil litigation system. Are courts appropriate institutions, and are class actions the appropriate procedure, for resolving disputes about genetically modified organisms (GMOs)? After addressing the institutional question, this article focuses on procedure. Although class actions are…
Photographic copy of drawing by Modjeski and Masters, Engineers of ...
Photographic copy of drawing by Modjeski and Masters, Engineers of the proposed Huey P. Long Bridge Widening. Original drawing located in the office of Modjeski and Masters, Consulting Engineers at 1055 St. Charles Avenue, New Orleans, LA. 70130. MAY 13, 2005 DRAWING OF THE PROPOSED HUEY P. LONG BRIDGE WIDENING, U.S. 90, MAIN BRIDGE SUPERSTRUCTURE, SHOWING STRUCTURE PLAN AND ELEVATION -2 AND TYPICAL SECTION THROUGH BRIDGE AT PIER I AND II. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA
STS-61 air-bearing floor training in bldg 9N with Astronaut Jeff Hoffman
1993-06-07
Making use of the air-bearing floor in JSC's Shuttle mockup and integration laboratory, Astronaut Jeffrey A. Hoffman practices working with the Hubble Space Telescope's Wide Field/Planetary Camera (WF/PC). Changing out the large camera is one of several jobs to be performed by STS-61.
Astronauts Griggs and Hoffman try to fasten devices on end of RMS
NASA Technical Reports Server (NTRS)
1985-01-01
Astronauts S. David Griggs, left, and Jeffrey A. Hoffman join efforts to fasten one of two snag type devices on the end of the Canadian-built remote manipulator system (RMS) arm of the Shuttle Discovery. A partial view of the Earth's horizon can be seen behind the shuttle.
"Hiding in Plain Sight": An Interview with Cara Hoffman
ERIC Educational Resources Information Center
Hosey, Sara
2014-01-01
Cara Hoffman's work enacts George Orwell's imperative to "pay attention to the obvious" (an idea that several sympathetic characters repeat in her 2011 novel "So Much Pretty"), probing aspects of twenty-first century life in the United States that have become so accepted as to be unremarkable, such as epidemic levels of…
Photographic copy of drawing by Modjeski and Masters, Engineers of ...
Photographic copy of drawing by Modjeski and Masters, Engineers of the proposed Huey P. Long Bridge Widening. Original drawing located in the office of Modjeski and Masters, Consulting Engineers at 1055 St. Charles Avenue, New Orleans, LA. 70130. MAY 13, 2005 DRAWING OF THE PROPOSED HUEY P. LONG BRIDGE WIDENING, U.S. 90, MAIN BRIDGE SUBSTRUCTURE, SHOWING GENERAL PLAN AND ELEVATION. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA
6. DETAIL VIEW OF BRIDGE DATEPLATE WHICH READS '1930, WHITE ...
6. DETAIL VIEW OF BRIDGE DATEPLATE WHICH READS '1930, WHITE RIVER BRIDGE, ARKANSAS HIGHWAY COMMISSION, DWIGHT BLACKWOOD, CHAIRMAN, JUSTIN MATTHEWS, J. LAN WILLIAMS, J.S. PARKS, SAM J. WILSON, COMMISSIONERS, C.S. CHRISTIAN, STATE HIGHWAY ENGINEER, IRA HEDRICK, INC., CONSULTING ENGINEERS, PARHAM CONT. CO., CONTRACTOR' - Augusta Bridge, Spanning White River at Highway 64, Augusta, Woodruff County, AR
Overview of the National Timber Bridge Inspection Study
James P. Wacker; Brian K. Brashaw; Frank Jalinoos
2013-01-01
As many engineers begin to implement life cycle cost analyses within the preliminary bridge design phase, there is a significant need for more reliable data on the expected service life of highway bridges. Many claims are being made about the expected longevity of concrete and steel bridges, but few are based on actual performance data. Because engineers are least...
Astronauts Jeffrey A. Hoffman (left) and Maurizio Cheli, representing European Space Agency (ESA),
NASA Technical Reports Server (NTRS)
1996-01-01
STS-75 ONBOARD VIEW --- Astronauts Jeffrey A. Hoffman (left) and Maurizio Cheli, representing European Space Agency (ESA), set up an experiment at the glovebox on the Space Shuttle Columbias mid-deck. The two mission specialists joined three other astronauts and an international payload specialist for more than 16 days of research aboard Columbia.
Design and performance verification of UHPC piles for deep foundations.
DOT National Transportation Integrated Search
2008-11-01
The strategic plan for bridge engineering issued by AASHTO in 2005 identified extending the service life and optimizing structural : systems of bridges in the United States as two grand challenges in bridge engineering, with the objective of producin...
Photographic copy of drawing by Modjeski and Masters, Engineers of ...
Photographic copy of drawing by Modjeski and Masters, Engineers of the proposed Huey P. Long Bridge Widening. Original drawing located in the office of Modjeski and Masters, Consulting Engineers at 1055 St. Charles Avenue, New Orleans, LA. 70130. MAY 13, 2005 DRAWING OF THE PROPOSED HUEY P. LONG BRIDGE WIDENING, U.S. 90, MAIN BRIDGE SUBSTRUCTURE, SHOWING STRUCTURE PLAN AND ELEVATION -1. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA
23. Photocopy of 1979 engineering drawing. 'IN DEPTH BRIDGE INSPECTION, ...
23. Photocopy of 1979 engineering drawing. 'IN DEPTH BRIDGE INSPECTION, LEWISBURG, UNION COUNTY,' SHOWING FRAMING PLAN AND STRESS DIAGRAM. (Courtesy of the Pennsylvania Department of Transportation.) - St. Anthony Street Bridge, Spanning Buffalo Creek, Legislative Route 59024, Lewisburg, Union County, PA
23 CFR 650.809 - Movable span bridges.
Code of Federal Regulations, 2012 CFR
2012-04-01
... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... shall be selected wherever practicable. If there are social, economic, environmental or engineering reasons which favor the selection of a movable bridge, a cost benefit analysis to support the need for the...
23 CFR 650.809 - Movable span bridges.
Code of Federal Regulations, 2014 CFR
2014-04-01
... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... shall be selected wherever practicable. If there are social, economic, environmental or engineering reasons which favor the selection of a movable bridge, a cost benefit analysis to support the need for the...
23 CFR 650.809 - Movable span bridges.
Code of Federal Regulations, 2013 CFR
2013-04-01
... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... shall be selected wherever practicable. If there are social, economic, environmental or engineering reasons which favor the selection of a movable bridge, a cost benefit analysis to support the need for the...
Synthesis and evaluation of the service limit state of engineered fills for bridge support.
DOT National Transportation Integrated Search
2016-02-02
This report synthesizes the current service limit state (SLS) design and analyses of engineered fills for bridge support used as shallow foundations. The SLS for settlement and deformations of bridge supports are summarized. Extensive literature revi...
7. DETAIL VIEW OF BRIDGE DATEPLATE WHICH READS '1929, WHITE ...
7. DETAIL VIEW OF BRIDGE DATEPLATE WHICH READS '1929, WHITE RIVER BRIDGE, BUILT BY ARKANSAS HIGHWAY COMMISSION, DWIGHT BLACKWOOD, CHAIRMAN, JUSTIN MATTHEWS, J. LAN WILLIAMS, J.S. PARKS, SAM J. WILSON, COMMISSIONERS, C.S. CHRISTIAN, STATE HIGHWAY ENGINEER, IRA HEDRICK, INC., CONSULTING ENGINEERS, LIST & WEATHERLY, CONSTRUCTION CO.' - Newport Bridge, Spanning White River at State Highway 14, Newport, Jackson County, AR
Guardrails for use on historic bridges: volume 2--bridge deck overhang design.
DOT National Transportation Integrated Search
2016-11-01
Bridges that are designated historic present a special challenge to bridge engineers whenever rehabilitation work or improvements are : made to the bridges. Federal and state laws protect historically significant bridges, and railings on these bridge...
CF60 Concrete Composition Design and Application on Fudiankou Xijiang Super Large Bridge
NASA Astrophysics Data System (ADS)
Qiu, Yi Mei; Wen, Sen Yuan; Chen, Jun Xiang
2018-06-01
Guangxi Wuzhou City Ring Road Fudiankou Xijiang super large bridge CF60 concrete is a new multi-phase composite high-performance concrete, this paper for the Fudiankou Xijiang bridge structure and characteristics of the project, in accordance with the principle of local materials and technical specification requirements, combined with the site conditions of CF60 engineering high performance concrete component materials, proportion and the technical performance, quantify the main physical and mechanical performance index. Analysis main influencing factors of the technical indicators, reasonable adjustment of concrete mix design parameters, and the use of technical means of admixture and multi-function composite admixture of concrete, obtain the optimal proportion of good work, process, mechanical properties stability and durability of engineering properties, recommend and verification of concrete mix; to explore the CF60 high performance concrete Soil in the Fudiankou Xijiang bridge application technology, detection and tracking the quality of concrete construction, concrete structure during the construction of the key technology and control points is proposed, evaluation of CF60 high performance concrete in the actual engineering application effect and benefit to ensure engineering quality of bridge structure and service life, and super long span bridge engineering construction to provide basis and reference.
Photographic copy of drawing by Modjeski and Masters, Engineers of ...
Photographic copy of drawing by Modjeski and Masters, Engineers of the proposed Huey P. Long Bridge Widening. Original drawing located in the office of Modjeski and Masters, Consulting Engineers at 1055 St. Charles Avenue, New Orleans, LA. 70130. JUNE 30, 2004 DRAWING OF THE PROPOSED HUEY P. LONG BRIDGE WIDENING, U.S. 90, MAIN BRIDGE SUPERSTRUCTURE, SHOWING SEQUENCE OF CONSTRUCTION 16, STAGE 5 (PLACEMENT OF NEW DECK AND FLOOR SYSTEM) AND STAGE 6. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA
Photographic copy of drawing by Modjeski and Masters, Engineers of ...
Photographic copy of drawing by Modjeski and Masters, Engineers of the proposed Huey P. Long Bridge Widening. Original drawing located in the office of Modjeski and Masters, Consulting Engineers at 1055 St. Charles Avenue, New Orleans, LA. 70130. JUNE 30, 2004 DRAWING OF THE PROPOSED HUEY P. LONG BRIDGE WIDENING, U.S. 90, MAIN BRIDGE SUPERSTRUCTURE, SHOWING SEQUENCE OF CONSTRUCTION 14, STAGE 3 PHASE 1 AND STAGE 3 PHASE 2. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA
Photographic copy of drawing by Modjeski and Masters, Engineers of ...
Photographic copy of drawing by Modjeski and Masters, Engineers of the proposed Huey P. Long Bridge Widening. Original drawing located in the office of Modjeski and Masters, Consulting Engineers at 1055 St. Charles Avenue, New Orleans, LA. 70130. JUNE 30, 2004 DRAWING OF THE PROPOSED HUEY P. LONG BRIDGE WIDENING, U.S. 90, MAIN BRIDGE SUPERSTRUCTURE, SHOWING SEQUENCE OF CONSTRUCTION 13, STAGE 1 AND STAGE 2 PHASE 1 AND STAGE 2 PHASE 2. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA
Photographic copy of drawing by Modjeski and Masters, Engineers of ...
Photographic copy of drawing by Modjeski and Masters, Engineers of the proposed Huey P. Long Bridge Widening. Original drawing located in the office of Modjeski and Masters, Consulting Engineers at 1055 St. Charles Avenue, New Orleans, LA. 70130. MAY 13, 2005 DRAWING OF THE PROPOSED HUEY P. LONG BRIDGE WIDENING, U.S. 90, MAIN BRIDGE SUPERSTRUCTURE, SHOWING ELEVATION AND SECTIONS AT PIER I AND II AND GENERAL DETAILS 1. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA
Photographic copy of drawing by Modjeski and Masters, Engineers of ...
Photographic copy of drawing by Modjeski and Masters, Engineers of the proposed Huey P. Long Bridge Widening. Original drawing located in the office of Modjeski and Masters, Consulting Engineers at 1055 St. Charles Avenue, New Orleans, LA. 70130. JUNE 30, 2004 DRAWING OF THE PROPOSED HUEY P. LONG BRIDGE WIDENING, U.S. 90, MAIN BRIDGE SUPERSTRUCTURE, SHOWING SEQUENCE OF CONSTRUCTION 15, STAGE 4 AND STAGE 5 (DECK AND FLOOR SYSTEM REMOVAL). - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA
Guardrails for use on historic bridges : volume 1--replacement strategies.
DOT National Transportation Integrated Search
2016-11-01
Bridges that are designated historic present a special challenge to bridge engineers whenever rehabilitation work or improvements are : made to the bridges. Federal and state laws protect historically significant bridges, and railings on these bridge...
From Wisconsin to Wyoming and Back Again: The Journey to a Bachelor's Degree and Teacher Licensure
ERIC Educational Resources Information Center
Finkel-Hoffman, Susan
2016-01-01
Susan Finkel-Hoffman, Ed.D. is the interim director of outreach for the Department of Special and Early Childhood Education at the University of Wisconsin-Oshkosh, and a coordinator for the Northern Arapaho Teacher Education Program. In this memior Finkel-Hoffman, recalls the journey of a group of teacher education students which began almost 10…
Astronauts Jeffrey A. Hoffman (left) and Franklin R. Chang-Diaz hold up a sign to celebrate the fact
NASA Technical Reports Server (NTRS)
1996-01-01
Astronauts Jeffrey A. Hoffman (left) and Franklin R. Chang-Diaz hold up a sign to celebrate the fact that each has surpassed the 1,000-hour mark in space during the flight. The two mission specialists joined three other astronauts and an international payload specialist for 16 days of scientific research aboard the Space Shuttle Columbia.
Al Qaeda and the Global War on Terror
2010-01-01
publishers throughout the foreseeable future, as will titillating inside stories of headline-making personalities such as Clinton, Bush, Rumsfeld...the top of Islam’s bottle of fat -free milk.98 Since his early twenties, bin Laden has exemplified the pious warrior, first pitted against the...1 Bruce Hoffman, Inside Terrorism (New York: Columbia University Press, 2006), 2-3, 16. According to Bruce Hoffman, a
13. Photocopy of drawing (original in AMTRAK Engineering Department), Boston ...
13. Photocopy of drawing (original in AMTRAK Engineering Department), Boston Bridge Works, Inc., March 8, 1912 N. Y. N. H. & H. R. R. BRIDGE #214 SHORE LINE DIV. DETAILS OF SIDEWALK BKTS, SHOES, ROLLERS, ETC. - Ferry Street Railroad Bridge, Ferry Street over New Haven Railroad, New Haven, New Haven County, CT
1. Photocopy of engineering drawing (original in the Office of ...
1. Photocopy of engineering drawing (original in the Office of the Cuyahoga County Engineer)--1907 NORTH ROCKY RIVER BRIDGE--PROPOSED DESIGN--REINFORCED CONCRETE: AN ALTERNATIVE DESIGN FOR THE DETROIT AVENUE CROSSING - Rocky River Bridge, Spanning Beaver Dam River, Rocky River, Cuyahoga County, OH
Inspection of the advanced engineered lumber railroad ties at the New Meadows Bridge.
DOT National Transportation Integrated Search
2009-01-01
In 2003, Engineered Materials of Maine (EMM, Bangor, Maine) fabricated forty-eight : (48) 8-inch wide, 10-inch deep, 12-foot long Advanced Engineered Lumber (AEL) mixed : hardwood glue-laminated (glulam) railroad bridge ties. Over a two day period in...
Vice President Pence Tours Jet Propulsion Laboratory
2018-04-28
U.S. Vice President Mike Pence, his wife Karen, and their daughter Charlotte are shown how to send a command to the Curiosity rover on Mars by Mars Curiosity Mission ACE Walt Hoffman during a tour of NASA's Jet Propulsion Laboratory, Saturday, April 28, 2018 in Pasadena, California. Hoffman asked Charlotte Pence if she would do the honors of sending the command to the rover. Photo Credit: (NASA/Bill Ingalls)
Hybrid Threat Center of Gravity Analysis: Cutting the Gordian Knot
2016-04-04
U.S. Marine Corps General James Mattis summed this best when he stated that “we expect future enemies to look at the four approaches [Traditional...synthesis is what we call hybrid warfare.”15 15 James N. Mattis and Frank Hoffman, "Future...accoun tid=12686 (accessed August 16, 2015). Mattis , James N. and Frank Hoffman. "Future Warfare: The Rise of Hybrid wars." United States Naval
2013-05-29
CAPE CANAVERAL, Fla. – Ed Hoffman, from left, Jack Fox and Rob Mueller discuss techniques to enable and enhance innovation during the third session in a weeklong series called "Masters with Masters" at the agency's Kennedy Space Center in Florida. Hoffman, NASA's chief Knowledge officer, Fox, chief, Surface Systems Office, and Rob Mueller, senior technologist, Surface Systems Office, talked about the work of the Swamp Works facility at Kennedy. Photo credit: NASA/Jim Grossmann
2013-05-30
CAPE CANAVERAL, Fla. – Ed Hoffman, from left, Jack Fox and Rob Mueller discuss techniques to enable and enhance innovation during the third session in a weeklong series called "Masters with Masters" at the agency's Kennedy Space Center in Florida. Hoffman, NASA's chief Knowledge officer, Fox, chief, Surface Systems Office, and Rob Mueller, senior technologist, Surface Systems Office, talked about the work of the Swamp Works facility at Kennedy. Photo credit: NASA/Jim Grossmann
Fish collection data associated with the data analysis presented in Hoffman et al. 2016. Fisheries 41(1):26-37, DOI: 10.1080/03632415.2015.1114926This dataset is associated with the following publication:Hoffman , J., J. Schloesser, A. Trebitz , G. Peterson , M. Gutsch , H. Quinlan, and J. Kelly. Sampling design for early detection of aquatic invasive species in Great Lakes ports. FISHERIES. American Fisheries Society, Bethesda, MD, USA, 41(1): 26-37, (2016).
Newport Pell Bridge traffic and revenue study
DOT National Transportation Integrated Search
2010-01-12
Jacobs Engineering conducted a traffic and toll revenue study for the Claiborne Pell Newport Bridge : (Newport Pell Bridge or Pell Bridge) upon the request of the Rhode Island Turnpike and Bridge : Authority (RITBA). This study is being c...
ERIC Educational Resources Information Center
Johnson, Jennifer Michelle
2016-01-01
Purpose: This paper aims to highlight the potential of science, technology, engineering and mathematics (STEM) summer bridge programs to promote college persistence by fostering a positive science identity among participants that is culturally consistent with the values and experiences of African American students. Design/methodology/approach:…
23 CFR 650.809 - Movable span bridges.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Movable span bridges. 650.809 Section 650.809 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.809 Movable span bridges. A fixed bridge...
23 CFR 650.809 - Movable span bridges.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Movable span bridges. 650.809 Section 650.809 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.809 Movable span bridges. A fixed bridge...
Bridges with Trigonometry Equals Engineering Achievement
ERIC Educational Resources Information Center
Gathing, Ahmed L.
2011-01-01
Exemplary and fun technology education classes in high schools are always welcome. The author introduces bridge building to his ninth graders and other students who comprise the Introduction to Engineering and Technology course within the first two months of the fall semester. In Georgia, Introduction to Engineering and Technology is the first of…
20. San FranciscoOakland Bay Bridge contract recipients, April 28, 1933, ...
20. San Francisco-Oakland Bay Bridge contract recipients, April 28, 1933, photographer unknown. Standing, left to right: Edward J. Schneider, Columbia Steel Corporation; C.C. Horton, Healy-Tibbitts Construction Company; Henry J. Kaiser, Bridge Builders, Inc.; Albert Huber, Clinton Construction Company; Allan McDonald, Transbay Construction Company; C.C. Carleton, Chief, Division of Contracts and Rights of Way, California Department of Public Works. Seated, left to right: Henry J. Brunnier, Consulting Engineer, Member of Consulting Board, San Francisco-Oakland Bay Bridge; Charles E. Andrew, Bridge Engineer, San Francisco-Oakland Bay Bridge; Earl Lee Kelly, Director, California Department of Public Works; Harrison S. Robinson, President, Financial ... - Salt River Bridge, Spanning Salt River at Dillon Road, Ferndale, Humboldt County, CA
2002-05-28
28, 2002 Inventors: Hoffman; Ned (Sebastopol, CA); Pare, Jr.; David Ferrin (Berkeley, CA); Lee; Jonathan Alexander (Oakland, CA); Lapsley; Philip...Transaction Processor 5. FUNDING NUMBERS 6. AUTHOR(S) Hoffman, Ned; Pare Jr, David Ferrin; Lee, Jonathan Alexander; Lapsley, Philip Dean 7...408. 4845636 Jul., 1989 Walker 705/39. 4926480 May., 1990 Chaum 380/23. 4947028 Aug., 1990 Gorog 235/380. 4961142 Oct., 1990 Elliott et al. 364/408
6. Photocopied December 1977, from loose original engineering drawing, Jervis ...
6. Photocopied December 1977, from loose original engineering drawing, Jervis Library. IRON PLATES OVER BRIDGE. - Old Croton Aqueduct, Sing Sing Kill Bridge, Spanning Aqueduct Street & Broadway, Ossining, Westchester County, NY
23 CFR 650.805 - Bridges not requiring a USCG permit.
Code of Federal Regulations, 2013 CFR
2013-04-01
... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.805 Bridges not... Engineers if the susceptibility to improvement for navigation of the water of concern is unknown and shall...
23 CFR 650.805 - Bridges not requiring a USCG permit.
Code of Federal Regulations, 2011 CFR
2011-04-01
... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.805 Bridges not... Engineers if the susceptibility to improvement for navigation of the water of concern is unknown and shall...
23 CFR 650.805 - Bridges not requiring a USCG permit.
Code of Federal Regulations, 2014 CFR
2014-04-01
... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.805 Bridges not... Engineers if the susceptibility to improvement for navigation of the water of concern is unknown and shall...
23 CFR 650.805 - Bridges not requiring a USCG permit.
Code of Federal Regulations, 2010 CFR
2010-04-01
... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.805 Bridges not... Engineers if the susceptibility to improvement for navigation of the water of concern is unknown and shall...
23 CFR 650.805 - Bridges not requiring a USCG permit.
Code of Federal Regulations, 2012 CFR
2012-04-01
... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.805 Bridges not... Engineers if the susceptibility to improvement for navigation of the water of concern is unknown and shall...
A Hierarchical Model and Analysis of Factors Affecting the Adoption of Timber as a Bridge
Robert L. Smith; Robert J. Bush; Daniel L. Schmoldt
1995-01-01
The Analytical Hierarchy Process was used to characterize the bridge material selection decisions of highway engineers and local highway officials across the United States. State Department of Transportation engineers, private consulting engineers, and local highway officials were personally interviewed in Mississippi, Virginia, Washington, and Wisconsin to identify...
2013-05-29
CAPE CANAVERAL, Fla. – Ed Hoffman, from left, Bob Sieck and Bob Cabana discuss techniques to handle a transition era during the second session in a weeklong series called "Masters with Masters" at the agency's Kennedy Space Center in Florida. Hoffman, NASA's chief Knowledge officer, Sieck, a former space shuttle launch director, and Cabana, the director of Kennedy, focused on the transition from Apollo to the shuttle and the current transition under way following the shuttle fleet's retirement. Photo credit: NASA/Jim Grossmann
2013-05-29
CAPE CANAVERAL, Fla. – Ed Hoffman, from left, Bob Sieck and Bob Cabana discuss techniques to handle a transition era during the second session in a weeklong series called "Masters with Masters" at the agency's Kennedy Space Center in Florida. Hoffman, NASA's chief Knowledge officer, Sieck, a former space shuttle launch director, and Cabana, the director of Kennedy, focused on the transition from Apollo to the shuttle and the current transition under way following the shuttle fleet's retirement. Photo credit: NASA/Jim Grossmann
2013-05-29
CAPE CANAVERAL, Fla. – Ed Hoffman, from left, Bob Sieck and Bob Cabana discuss techniques to handle a transition era during the second session in a weeklong series called "Masters with Masters" at the agency's Kennedy Space Center in Florida. Hoffman, NASA's chief Knowledge officer, Sieck, a former space shuttle launch director, and Cabana, the director of Kennedy, focused on the transition from Apollo to the shuttle and the current transition under way following the shuttle fleet's retirement. Photo credit: NASA/Jim Grossmann
2013-05-29
CAPE CANAVERAL, Fla. – Ed Hoffman, from left, Bob Sieck and Bob Cabana discuss techniques to handle a transition era during the second session in a weeklong series called "Masters with Masters" at the agency's Kennedy Space Center in Florida. Hoffman, NASA's chief Knowledge officer, Sieck, a former space shuttle launch director, and Cabana, the director of Kennedy, focused on the transition from Apollo to the shuttle and the current transition under way following the shuttle fleet's retirement. Photo credit: NASA/Jim Grossmann
58. Photographic copy of original construction plan (St. Paul Engineer's ...
58. Photographic copy of original construction plan (St. Paul Engineer's Office, Wabasha St. Bridge, Plan of Masonry, February 1899); south abutment - Wabasha Street Bridge, Spanning Mississippi River at Wabasha Street, Saint Paul, Ramsey County, MN
A model study of bridge hydraulics
DOT National Transportation Integrated Search
2010-08-01
Most flood studies in the United States use the Army Corps of Engineers HEC-RAS (Hydrologic Engineering : Centers River Analysis System) computer program. This study was carried out to compare results of HEC-RAS : bridge modeling with laboratory e...
23 CFR 650.407 - Application for bridge replacement or rehabilitation.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Application for bridge replacement or rehabilitation... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.407 Application for bridge replacement or rehabilitation. (a) Agencies participate...
23 CFR 650.411 - Procedures for bridge replacement and rehabilitation projects.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Procedures for bridge replacement and rehabilitation... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.411 Procedures for bridge replacement and rehabilitation projects. (a) Consideration...
23 CFR 650.411 - Procedures for bridge replacement and rehabilitation projects.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Procedures for bridge replacement and rehabilitation... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.411 Procedures for bridge replacement and rehabilitation projects. (a) Consideration...
23 CFR 650.407 - Application for bridge replacement or rehabilitation.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Application for bridge replacement or rehabilitation... ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.407 Application for bridge replacement or rehabilitation. (a) Agencies participate...
Bridge deterioration models to support Indiana's bridge management system.
DOT National Transportation Integrated Search
2016-02-01
An effective bridge management system that is equipped with reliable deterioration models enables agency engineers to carry out : monitoring and long-term programming of bridge repair actions. At the project level, deterioration models help the agenc...
DOT National Transportation Integrated Search
1995-08-01
Bridge design engineers and local highway officials make bridge replacement decisions across the : United States. The Analytical Hierarchy Process was used to characterize the bridge material selection : decision of these individuals. State Departmen...
Engineering Design Processes in Seventh-Grade Classrooms: Bridging the Engineering Education Gap
ERIC Educational Resources Information Center
English, Lyn D.; Hudson, Peter B.; Dawes, Les
2012-01-01
This paper reports on some findings from the first year of a three-year longitudinal study, in which seventh- to ninth-graders were introduced to engineering education. Specifically, the paper addresses students' responses to an initial design activity involving bridge construction, which was implemented at the end of seventh grade. This paper…
Engineering Habits of Mind… for Better or Worse?
ERIC Educational Resources Information Center
Hodgson, Dan; Cloran, Peter; Johnson, Rory
2017-01-01
Engineering Habits of Mind (EHoMs) were first introduced to a target group of Year 9 (age 14) students who the authors felt were disengaged with science, technology, and computing. These students were invited to take part in an engineering challenge with a school in Qatar. This involved making a bridge and rolling a marble over the bridge. The…
Impacts of a Summer Bridge Program in Engineering on Student Retention and Graduation
ERIC Educational Resources Information Center
Cançado, Luciana; Reisel, John R.; Walker, Cindy M.
2018-01-01
A summer bridge program was developed in an engineering program to advance the preparation of incoming freshmen students, particularly with respect to their math course placement. The program was intended to raise the initial math course placement of students who otherwise would begin their engineering studies in courses below Calculus I. One…
Information Geography: A Bridge between Engineering and the Social Sciences
ERIC Educational Resources Information Center
Paradiso, Maria
2006-01-01
This paper presents the metaphor of engineering and the social sciences located on either side of a chasm and connected by the bridge of information geography. Information geography is not an integral part of engineering and is a new field within geography, a social science discipline. The specialty of information geography is one of the newest in…
Post-Earthquake Assessment of Nevada Bridges Using ShakeMap/ShakeCast
DOT National Transportation Integrated Search
2016-01-01
Post-earthquake capacity of Nevada highway bridges is examined through a combination of engineering study and scenario earthquake evaluation. The study was undertaken by the University of Nevada Reno Department of Civil and Environmental Engineering ...
5. Photocopied December 1977, from loose original engineering drawing, Jervis ...
5. Photocopied December 1977, from loose original engineering drawing, Jervis Library. SECTION OF AQUEDUCT SHOWING CAST-IRON LINING AS USED OVER BRIDGES. - Old Croton Aqueduct, Sing Sing Kill Bridge, Spanning Aqueduct Street & Broadway, Ossining, Westchester County, NY
Methods of modifying historic bridges for contemporary use.
DOT National Transportation Integrated Search
1980-01-01
Studied by a team of experts in the fields of history, bridge engineering, architecture, and computer analysis were 21 old truss bridges of historical importance located in Virginia. These old bridges are narrow and have low load-carrying capacities,...
STS-35 crewmembers watch a sphere of water float on OV-102's middeck
1990-12-10
STS035-15-035 (2-10 Dec 1990) --- STS-35 crewmembers perform a microgravity experiment using their drinking water while on the middeck of Columbia, Orbiter Vehicle (OV) 102. Mission Specialist (MS) Jeffrey A. Hoffman (left) has released some water from a drinking container which he holds in his hand. MS John M. Lounge (wearing glasses, center) and Payload Specialist Samuel T. Durrance along with Hoffman study the changing shape and movement of the sphere of water.
51-D astronauts Griggs and Hoffman with toys for use in Toys in Space Project
NASA Technical Reports Server (NTRS)
1985-01-01
Astronaut David Griggs, 51-D mission specialist, monitors the behavior of a pink plastic flipping toy, nicknamed 'Rat Stuff.' Behind the toy are mock-ups of the middeck lockers. The small toy is part of the 'Toys in Space' project for NASA's STS 51-E mission (26475); Astronaut Jeff A. Hoffman, 51-D mission specialist, goes through a one-G simulation of operation of a friction-powered toy car in NASA's one-G Shuttle trainer at JSC (26476).
STS-46 crewmembers participate in Fixed Base (FB) SMS training at JSC
NASA Technical Reports Server (NTRS)
1992-01-01
STS-46 Atlantis, Orbiter Vehicle (OV) 104, Pilot Andrew M. Allen hands Mission Specialist (MS) and Payload Commander (PLC) Jeffrey A. Hoffman checklists from middeck locker MF43E during training session in JSC's fixed base (FB) shuttle mission simulator (SMS) located in Mission Simulation and Training Facility Bldg 5. European Space Agency (ESA) MS Claude Nicollier outfitted with communications kit assembly headset (HDST) and equipment looks beyond Hoffman to the opposite side of the middeck.
NASA Astrophysics Data System (ADS)
Eid, A.
2017-11-01
In the framework of Darmois-Israel formalism, the dynamics of motion equations of spherically symmetric thin shell wormholes that are supported by a modified Chaplygin gas in Einstein-Hoffman-Born-Infeld theory are constructed. The stability analysis of a thin shell wormhole is also discussed using a linearized radial perturbation around static solutions at the wormhole throat. The existence of stable static solutions depends on the value of some parameters of dynamical shell.
Astronauts Hoffman and Musgrave replace Solar Array Drive Electronics
1993-12-09
STS061-102-010 (9 Dec 1993) --- Astronauts Jeffrey A. Hoffman (left) and F. Story Musgrave team to replace one of two Solar Array Drive Electronics (SADE) units on the Hubble Space Telescope (HST). Musgrave is standing on a foot restraint mounted on the end of the Space Shuttle Endeavour's Remote Manipulator System (RMS) arm. The black object, in upper left corner, is part of the window frame, through which this 70mm frame was exposed, inside Endeavour's cabin.
26. VIEW FROM EAST IN BRIDGE TENDER'S HOUSE, LEVERS FOR ...
26. VIEW FROM EAST IN BRIDGE TENDER'S HOUSE, LEVERS FOR GASOLINE ENGINE OPERATION FOR BRIDGE AND THEIR CONNECTIONS TO CONTROL RODS ON DOWNSTREAM SIDE OF SWING-SPAN; new bridge located in background - Tipers Bridge, Spanning Great Wicomico River at State Route 200, Kilmarnock, Lancaster County, VA
DOT National Transportation Integrated Search
1995-08-01
Bridge design engineers and local highway officials make bridge replacement decsions across the U.S. The Analytical Hierarchical Process was used to characterize the bridge material selection decisions of these individuals. State Departments of Trans...
DOT National Transportation Integrated Search
2013-09-01
The strength and durability of highway bridges are two of the key components in maintaining a : high level of freight transportation capacity on the nations highways. Superhydrophobic : engineered cementitious composite (SECC) is a new advanced con...
The effect of bridge deck design methodology on crack control.
DOT National Transportation Integrated Search
2010-01-30
At present, the Idaho Transportation Department (ITD) Bridge Design Manual allows engineers to use the AASHTO empirical method to : design concrete bridge decks. However, the ITD Bridge Section would like to compare their design practices to those em...
Bridge to Persistence: Interactions with Educators as Social Capital for Latina/o Engineering Majors
ERIC Educational Resources Information Center
Dika, Sandra L.; Martin, Julie P.
2018-01-01
This study employs the notion of bridging social capital to investigate the extent to which different forms and quantity of interactions with educators predict intentions to persist in engineering among a sample of Latina/o engineering majors from five public 4-year institutions in the United States. Different forms of capital were effective for…
Boston in the 1970s: is there a lesbian community? And if there is, who is in it?
Hoffman, Amy
2014-01-01
This excerpt from Amy Hoffman's memoir, An Army of Ex-Lovers: My Life at the Gay Community News (University of Massachusetts Press, 2007), describes some of the alternative community institutions serving lesbian feminists in Boston in the late 1970s. Hoffman, in her twenties at the time and fairly newly out, is an enthusiastic patron of these institutions. However, after a while, she begins to wonder about them. Boston in the 1970s was racially segregated and tense; a judicial order to desegregate the schools led to racist riots. The women's community was, sadly, no more diverse than the city's neighborhoods, and the alternative institutions, Hoffman realizes, are organized by and cater mostly to young, white, middle-class women like her. They fail to appeal to the needs and interests of poor women of color-although of course some do participate, and others become active in service organizations such as battered women's shelters.
Development of an engineered cementitious composite to enhance bridge approach slab durability.
DOT National Transportation Integrated Search
2013-06-01
The strength and durability of highway bridges are two of the key components in maintaining a : high level of freight transportation capacity on the nations highways. : The CFIRE project 04-09 demonstrated the feasibility of a new hybrid engineered...
18. Photocopy of a drawing (from the Corps of Engineers ...
18. Photocopy of a drawing (from the Corps of Engineers report, March 1979, plate 3) SECTION THROUGH BRIDGE 808 AND THE DAM - Wagamon Pond Dam & Bridge, Spanning Broadkill River at State Road No. 197 (Mulberry Street), Milton, Sussex County, DE
home about peer news events research products laboratories publications nisee b.i.p. members Engineering Services is Hiring Bridge Design and Bridge Construction Engineers 05/16/18 - PEER Research Research Project Highlight: "Dissipative Base Connections for Moment Frame Structures in Airports and
Full-Scale Testing of Thermoplastic Composite I-Beams for Bridges
2017-06-01
ER D C/ CE RL T R- 17 -1 8 ACSIM Technology Standards Group Full-Scale Testing of Thermoplastic Composite I-Beams for Bridges Co ns tr...default. ACSIM Technology Standards Group ERDC/CERL TR-17-18 June 2017 Full-Scale Testing of Thermoplastic Composite I-Beams for Bridges Ghassan... tests were con- ducted on commercially available, thermoplastic polymer composite I- beams at U.S. Army Corps of Engineers, Engineer Research and
23 CFR 661.47 - Can bridge maintenance be performed with IRRBP funds?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Can bridge maintenance be performed with IRRBP funds... ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.47 Can bridge maintenance be performed with IRRBP funds? No. Bridge maintenance repairs, e.g., guard rail repair, deck repairs, repair of...
23 CFR 661.47 - Can bridge maintenance be performed with IRRBP funds?
Code of Federal Regulations, 2010 CFR
2010-04-01
... ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.47 Can bridge maintenance be performed with IRRBP funds? No. Bridge maintenance repairs, e.g., guard rail repair, deck repairs, repair of... 23 Highways 1 2010-04-01 2010-04-01 false Can bridge maintenance be performed with IRRBP funds...
Effects of Irregular Bridge Columns and Feasibility of Seismic Regularity
NASA Astrophysics Data System (ADS)
Thomas, Abey E.
2018-05-01
Bridges with unequal column height is one of the main irregularities in bridge design particularly while negotiating steep valleys, making the bridges vulnerable to seismic action. The desirable behaviour of bridge columns towards seismic loading is that, they should perform in a regular fashion, i.e. the capacity of each column should be utilized evenly. But, this type of behaviour is often missing when the column heights are unequal along the length of the bridge, allowing short columns to bear the maximum lateral load. In the present study, the effects of unequal column height on the global seismic performance of bridges are studied using pushover analysis. Codes such as CalTrans (Engineering service center, earthquake engineering branch, 2013) and EC-8 (EN 1998-2: design of structures for earthquake resistance. Part 2: bridges, European Committee for Standardization, Brussels, 2005) suggests seismic regularity criterion for achieving regular seismic performance level at all the bridge columns. The feasibility of adopting these seismic regularity criterions along with those mentioned in literatures will be assessed for bridges designed as per the Indian Standards in the present study.
DOT National Transportation Integrated Search
2013-09-01
The mission of Rutgers Universitys Center for Advanced Infrastructure and Transportation (CAIT) Bridge Resource Program : (BRP) is to provide bridge engineering support to the New Jersey Department of Transportation (NJDOT)s Bridge : Engineerin...
Evaluation of design methods to determine scour depths for bridge structures.
DOT National Transportation Integrated Search
2013-03-01
Scour of bridge foundations is the most common cause of bridge failures. The overall goal of this project was to evaluate the applicability of the existing Hydraulic Engineering Circular (HEC-18) documents method to Louisiana bridges that are mostly ...
Use of railroad flat cars for low-volume road bridges.
DOT National Transportation Integrated Search
1999-08-01
In an attempt to solve the bridge problem faced by many county engineers, this : investigation focused on a low cost bridge alternative that consists of using railroad flatcars : (RRFC) as the bridge superstructure. The intent of this study was to de...
Power supply circuit for an ion engine sequentially operated power inverters
NASA Technical Reports Server (NTRS)
Cardwell, Jr., Gilbert I. (Inventor)
2000-01-01
A power supply circuit for an ion engine suitable for a spacecraft has a voltage bus having input line and a return line. The power supply circuit includes a pulse width modulation circuit. A plurality of bridge inverter circuits is coupled to the bus and the pulse width modulation circuit. The pulse width modulation circuit generates operating signals having a variable duty cycle. Each bridge inverter has a primary winding and a secondary winding. Each secondary winding is coupled to a rectifier bridge. Each secondary winding is coupled in series with another of the plurality of rectifier bridges.
17. Photocopy of a drawing (from the Corps of Engineers ...
17. Photocopy of a drawing (from the Corps of Engineers report, March 1979, plate 2) FRONT ELEVATION AND PLAN VIEW OF BRIDGE 808 IN 1979 - Wagamon Pond Dam & Bridge, Spanning Broadkill River at State Road No. 197 (Mulberry Street), Milton, Sussex County, DE
2. Photocopied December 1977, from loose original engineering drawing, Jervis ...
2. Photocopied December 1977, from loose original engineering drawing, Jervis Library. ELEVATIONS AND SECTIONS OF AQUEDUCT BRIDGE AT SING SING, SHOWING ALL THREE ARCHES, INCLUDING 88-FOOT ARCH. - Old Croton Aqueduct, Sing Sing Kill Bridge, Spanning Aqueduct Street & Broadway, Ossining, Westchester County, NY
DOT National Transportation Integrated Search
1970-07-01
The collapse of the Point Pleasant Bridge created many unique problems and posed many new questions to the bridge engineering profession. One question that was paramount was, "What caused the bridge to collapse?". Arrangements were made with the Corp...
"Bridge #6 Rock Creek: Castiron 48" pipe lines to ...
"Bridge #6 - Rock Creek: Cast-iron 48" pipe lines to Gravity - 1859." Construction photo of Pennsylvania Avenue Bridge, 1859. Photograph courtesy Washington Aqueduct Division, U.S. Army Corps of Engineers - Pennsylvania Avenue Bridge, Spanning Rock Creek & Potomac Parkway, Washington, District of Columbia, DC
Civil engineering reference guide
DOE Office of Scientific and Technical Information (OSTI.GOV)
Merritt, F.S.
1986-01-01
The civil engineering reference guide contains the following: Structural theory. Structural steel design. Concrete design and construction. Wood design and construction. Bridge engineering. Geotechnical engineering. Water engineering. Environmental engineering. Surveying.
2014-05-01
of Ships], Charles Griffin and Company, London, 246-261 (1908). [6] Volpich, H. & Bridge, I . C., “Paddle Wheels Pt 1: Preliminary Model Experiments...Transactions of the Institution of Engineers and Shipbuilders in Scotland, 327-380 (1955). [7] Volpich, H. & Bridge, I . C., “Paddle Wheels...Bridge, I . C., “Paddle Wheels Pt III: Ship/Model Correlation,” Transactions of the Institution of Engineers and Shipbuilders in Scotland, 512-550
DOT National Transportation Integrated Search
2007-02-01
This document is the conference program of the 5th National Seismic Conference on Bridges and Highways. The conference was held in San Francisco on September 18-20, 2006 and attracted over 300 engineers, academician, and students from around the worl...
STS-35 MS Hoffman is greeted by JSC manager Puddy and NASA administrator Lenoir
NASA Technical Reports Server (NTRS)
1990-01-01
NASA Associate Administrator for Space Flight Dr. William B. Lenoir (second left) shakes hands with Mission Specialist (MS) Jeffrey A. Hoffman soon after the seven crewmembers egressed Columbia, Orbiter Vehicle (OV) 102, at Edwards Air Force Base (EAFB), California. Also pictured are JSC Flight Crew Operations Directorate (FCOD) Director Donald R. Puddy (left) and Commander Vance D. Brand. OV-102 landed on EAFB concrete runway 22 at 9:54:09 pm (Pacific Standard Time) ending its nine-day STS-35 Astronomy Laboratory 1 (ASTRO-1) mission.
NASA Technical Reports Server (NTRS)
Tsukamoto, Katsuo
1988-01-01
Direct visualization of three dimensional transfer process of both heat and mass around a growing crystal and mono-molecular growth layers on the surface is possible in situ by means of high resolution Hoffman modulation contrast microscopy coupled with three wavelength two beam Mach-Zehnder interferometry. This in situ observation is very suitable for the verification of the growth mechanism of a crystal in a solution or a melt in microgravity.
Progression into Engineering. Building Bridges between Education, Training and Employment.
ERIC Educational Resources Information Center
Evans, Karen; And Others
This publication reports findings of a 12-month study of progression opportunities in engineering education and training, a study which explored ways of bridging the gap between skills and knowledge acquired through basic training and prevocational education and those required for progression to higher levels of occupational training and…
Code of Federal Regulations, 2010 CFR
2010-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.401 Purpose. The... Bridge Replacement and Rehabilitation Program in accordance with 23 U.S.C. 144. ...
2010 Panel on the Biomaterials Grand Challenges
Reichert, William “Monty”; Ratner, Buddy D.; Anderson, James; Coury, Art; Hoffman, Allan S.; Laurencin, Cato T.; Tirrell, David
2014-01-01
In 2009, the National Academy for Engineering issued the Grand Challenges for Engineering in the 21st Century comprised of 14 technical challenges that must be addressed to build a healthy, profitable, sustainable, and secure global community (http://www.engineeringchallenges.org). Although crucial, none of the NEA Grand Challenges adequately addressed the challenges that face the biomaterials community. In response to the NAE Grand Challenges, Monty Reichert of Duke University organized a panel entitled Grand Challenges in Biomaterials at the at the 2010 Society for Biomaterials Annual Meeting in Seattle. Six members of the National Academies—Buddy Ratner, James Anderson, Allan Hoffman, Art Coury, Cato Laurencin, and David Tirrell—were asked to propose a grand challenge to the audience that, if met, would significantly impact the future of biomaterials and medical devices. Successfully meeting these challenges will speed the 60-plus year transition from commodity, off-the-shelf biomaterials to bioengineered chemistries, and biomaterial devices that will significantly advance our ability to address patient needs and also to create new market opportunities. PMID:21171147
25. VIEW EAST IN BRIDGE TENDER'S HOUSE, (left) ORIGINAL LEVERS ...
25. VIEW EAST IN BRIDGE TENDER'S HOUSE, (left) ORIGINAL LEVERS FOR GASOLINE ENGINE OPERATION OF SWING-SPAN, (right) PANEL F ELECTRIC OPERATION OF GATES AND SWING-SPAN; new bridge located in background - Tipers Bridge, Spanning Great Wicomico River at State Route 200, Kilmarnock, Lancaster County, VA
46 CFR 113.35-17 - Vessels with navigating bridge control.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Vessels with navigating bridge control. 113.35-17 Section 113.35-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING... bridge control. Each vessel with navigating bridge throttle control must have a positive mechanical stop...
46 CFR 113.35-17 - Vessels with navigating bridge control.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Vessels with navigating bridge control. 113.35-17 Section 113.35-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING... bridge control. Each vessel with navigating bridge throttle control must have a positive mechanical stop...
46 CFR 113.35-17 - Vessels with navigating bridge control.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Vessels with navigating bridge control. 113.35-17 Section 113.35-17 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING... bridge control. Each vessel with navigating bridge throttle control must have a positive mechanical stop...
DOT National Transportation Integrated Search
2011-12-01
Current AASHTO provisions for the conventional load rating of flat slab bridges rely on the equivalent strip method : of analysis for determining live load effects, this is generally regarded as overly conservative by many professional : engineers. A...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Design. 237.131 Section 237.131 Transportation... TRANSPORTATION BRIDGE SAFETY STANDARDS Repair and Modification of Bridges § 237.131 Design. Each repair or... component of a bridge shall be designed by a railroad bridge engineer. The design shall specify the manner...
Compact valve actuation mechanism
NASA Technical Reports Server (NTRS)
Brogdon, James William (Inventor); Gill, David Keith (Inventor)
2000-01-01
A valve actuation device. The device may include a free floating valve bridge movably supported within a cavity in the engine housing. The bridge may be provided with a cavity and an orifice arrangement for pumping gases entrained with lubricating fluid toward the piston stems as the bridge reciprocates back and forth. The device may also include a rocker arm that has a U-shaped cross-sectional shape for receiving at least a portion of the valve bridge, valve stem valve spring and spring retainer therein. The rocker arm may be provided with lubrication passages for directing lubrication to the point wherein it is pivotally affixed to the engine housing.
18. Photocopy of drawing of bronze dedication plaque, circa 1903 ...
18. Photocopy of drawing of bronze dedication plaque, circa 1903 (original drawing in possession of City Engineer's Office Grand Rapids, Michigan) DEDICATION PLAQUE. - Bridge Street Bridge, Spanning Grand River, Michigan & Bridge Streets, Grand Rapids, MI
A study of accidents involving highway bridges.
DOT National Transportation Integrated Search
1971-01-01
Accident reports, field evaluations, state police and highway engineer questionnaire replies, and other data sources were used to conduct a general study of accidents involving highway bridges in Virginia. The bridges included in the study were divid...
Simple model of cable-stayed bridge deck subjected to static wind loading
NASA Astrophysics Data System (ADS)
Kang, Yi-Lung; Wang, Yang Cheng
1997-05-01
Cable-stayed bridges have been known since 18th century with aesthetics design. The structural system and the structural behavior are significantly different from those of continuous bridges. Compared to continuous bridge, cable- stayed bridges have more flexure bridge deck than those of continuous bridges.On the other hand, cable-stayed bridges have less stiffness to resist wind loading especially for lateral loads. The first considering of bridge engineering is safety. In 1940's, Tacoma Narrows Suspension Bridge destroyed by wind loading is a good example even though it is not a cable-stayed bridge. After the bridge was destroyed, a lot of research articles have been published regarding cable supported bridge subjected to wind loading. In recent days, high strength materials have been served. The bridge engineers use the advantages to expand the span length of cable-stayed bridges. Due to the span length increased and the use of high strength materials, cable- stayed bridges have more significant nonlinear behavior subjected to wind loading. In this paper, a slice bridge deck of cable-stayed bridge connected to internal support cables is considered. The deck has been considered to be subjected to lateral static wind loading. Since cables can not take compressive force, the deck has strongly nonlinear behavior even though the materials are linear elastic. Several primary load combinations have ben considered in this paper such as the bridge deck supposed to be moved horizontally without rotation or the bridge deck supposed to be moved horizontally with rotational deformation. The mathematical formulas and the numerical solutions are found and represented in graphical forms. The results can be provided to bridge designers and researchers for further study of this type of structure subjected to wind loading.
Dynamic characterization and damage detection in the I-40 bridge over the Rio Grande
DOE Office of Scientific and Technical Information (OSTI.GOV)
Farrar, C.R.; Baker, W.E.; Bell, T.M.
In the 1960`s and 1970`s over 2500 bridges were built in the U.S. with a design similar to those on Interstate 40 over the Rio Grande in Albuquerque, New Mexico. These bridges were built without structural redundancy and typically have only two plate girders carrying the entire dead and live loads. Failure of either girder is assumed to produce catastrophic failure of the bridge, hence these bridges are referred to as fracture-critical bridges. The Federal Highway Administration (FHWA) and the National Science Foundation (NSF) have provided funds to New Mexico State University (NMSU) through the New Mexico State Highway andmore » Transportation Department (NMSH&TD) and The Alliance For Transportation Research (ATR) for evaluation and testing of the existing fracture critical bridges over the Rio Grande. Because the 1-40 bridges over the Rio Grande were to be razed during the summer of 1993, the investigators were able to introduce simulated fatigue cracks, similar to those observed in the field, into the structure in order to test various damage identification methods and to observe the changes in load paths through the structure caused by the cracking. To support this research effort, NMSU contracted Los Alamos National Laboratory (LANL) to perform experimental modal analyses, and to develop experimentally verified numerical models of the bridge. Scientists from the LANL`s Condensed Matter and Thermal Physics Group (P-10) applied state-of-the-art sensors and data acquisition software to the modal tests. Engineers from the LANL`s Advanced Engineering Technology Group (MEE-13) conducted ambient and forced vibration tests to verify detailed and simplified finite element models of the bridge. Forced vibration testing was done in conjunction with engineers from Sandia National Laboratory (SNL) who provided and operated a hydraulic shaker.« less
Understanding Customer Product Choices: A Case Study Using the Analytical Hierarchy Process
Robert L. Smith; Robert J. Bush; Daniel L. Schmoldt
1996-01-01
The Analytical Hierarchy Process (AHP) was used to characterize the bridge material selection decisions of highway officials across the United States. Understanding product choices by utilizing the AHP allowed us to develop strategies for increasing the use of timber in bridge construction. State Department of Transportation engineers, private consulting engineers, and...
Ground Vehicle Power and Mobility Overview - Germany Visit
2011-11-10
the current and future force Survivability Robotics – Intelligent Systems Vehicle Electronics & Architecture Fuel, Water, Bridging ...Test Cell • Engine Generator Test Lab • Full Vehicle Environmental Test Cell • Hybrid Electric Reconfigurable Moveable Integration Testbed (HERMIT...Converter Conducted competitive runoff evaluations on Bridging Boat engine candidates Completed independent durability assessment of OEM
Bridging Water Resources Policy and Environmental Engineering in the Classroom at Cornell University
NASA Astrophysics Data System (ADS)
Walter, M. T.; Shaw, S. B.; Seifert, S.; Schwarz, T.
2006-12-01
Current university undergraduate students in environmental sciences and engineering are the next generation of environmental protection practitioners. Recognizing this, Cornell's Biological and Environmental Engineering department has developed a popular class, Watershed Engineering (BEE 473), specifically designed to bridge the too-common gap between water resources policy and state-of-art science and technology. Weekly homework assignments are to design real-life solutions to actual water resources problems, often with the objective of applying storm water policies to local situations. Where appropriate, usually in conjunction with recent amendments to the Federal Clean Water Act, this course introduces water resource protection tools and concepts developed in the Cornell Soil and Water Lab. Here we present several examples of how we build bridges between university classrooms and the complex world of water resources policy.
23 CFR 661.49 - Can IRRBP funds be spent on Interstate, State Highway, and Toll Road IRR bridges?
Code of Federal Regulations, 2011 CFR
2011-04-01
..., and Toll Road IRR bridges? 661.49 Section 661.49 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.49 Can IRRBP funds be spent on Interstate, State Highway, and Toll Road IRR bridges? Yes. Interstate...
1. General view of bridge looking north. This is the ...
1. General view of bridge looking north. This is the only suspension bridge in Cleveland. It was designed by Wilbur J. Watson and Associates, Consulting Engineers. Sections of the Wooden deck are missing, and the bridge is no longer used. - Sidaway Avenue Footbridge, Jackowo & Garden Valley neighborhood Vicinity, Cleveland, Cuyahoga County, OH
Impact of the Shodan Computer Search Engine on Internet-facing Industrial Control System Devices
2014-03-27
bridge implementation. The transparent bridge is designed using a Raspberry Pi configured with Linux IPtables and bridge-utils to bridge the on board...Ethernet card and a second USB Ethernet adapter. A Raspberry Pi is a credit-card-sized single-board computer running a version of Debian Linux. There
Simplified Analytical Model of a Covered Burr-Arch-Truss Timber Bridge
F. Fanous; D. Rammer; T. Wipf
2013-01-01
Due to the importance of historical timber covered bridges throughout history, their preservation is necessary. However, conducting an accurate structural evaluation of these types of bridges has always caused difficulties to bridge engineers. This paper summarizes an investigation that was sponsored by the Federal Highway Administration and the USDA Forest Products...
ERIC Educational Resources Information Center
Ashley, Michael; Cooper, Katelyn M.; Cala, Jacqueline M.; Brownell, Sara E.
2017-01-01
Summer bridge programs are designed to help transition students into the college learning environment. Increasingly, bridge programs are being developed in science, technology, engineering, and mathematics (STEM) disciplines because of the rigorous content and lower student persistence in college STEM compared with other disciplines. However, to…
23 CFR 661.49 - Can IRRBP funds be spent on Interstate, State Highway, and Toll Road IRR bridges?
Code of Federal Regulations, 2010 CFR
2010-04-01
..., and Toll Road IRR bridges? 661.49 Section 661.49 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.49 Can IRRBP funds be spent on Interstate, State Highway, and Toll Road IRR bridges? Yes. Interstate...
Translating Climate Projections for Bridge Engineering
NASA Astrophysics Data System (ADS)
Anderson, C.; Takle, E. S.; Krajewski, W.; Mantilla, R.; Quintero, F.
2015-12-01
A bridge vulnerability pilot study was conducted by Iowa Department of Transportation (IADOT) as one of nineteen pilots supported by the Federal Highway Administration Climate Change Resilience Pilots. Our pilot study team consisted of the IADOT senior bridge engineer who is the preliminary design section leader as well as climate and hydrological scientists. The pilot project culminated in a visual graphic designed by the bridge engineer (Figure 1), and an evaluation framework for bridge engineering design. The framework has four stages. The first two stages evaluate the spatial and temporal resolution needed in climate projection data in order to be suitable for input to a hydrology model. The framework separates streamflow simulation error into errors from the streamflow model and from the coarseness of input weather data series. In the final two stages, the framework evaluates credibility of climate projection streamflow simulations. Using an empirically downscaled data set, projection streamflow is generated. Error is computed in two time frames: the training period of the empirical downscaling methodology, and an out-of-sample period. If large errors in projection streamflow were observed during the training period, it would indicate low accuracy and, therefore, low credibility. If large errors in streamflow were observed during the out-of-sample period, it would mean the approach may not include some causes of change and, therefore, the climate projections would have limited credibility for setting expectations for changes. We address uncertainty with confidence intervals on quantiles of streamflow discharge. The results show the 95% confidence intervals have significant overlap. Nevertheless, the use of confidence intervals enabled engineering judgement. In our discussions, we noted the consistency in direction of change across basins, though the flood mechanism was different across basins, and the high bound of bridge lifetime period quantiles exceeded that of the historical period. This suggested the change was not isolated, and it systemically altered the risk profile. One suggestion to incorporate engineering judgement was to consider degrees of vulnerability using the median discharge of the historical period and the upper bound discharge for the bridge lifetime period.
39. Photocopy of bridge drawing, 1923 (original in possession of ...
39. Photocopy of bridge drawing, 1923 (original in possession of Wilkes-Barre City Engineer's Office) STRESS SHEET TRUSS SPANS - South Street Bridge, Spans Pennsylvania Avenue, Wilkes-Barre Boulevard, Pocono Northeast Railroad, Wilkes-Barre, Luzerne County, PA
Object Markers at Narrow Bridges on Low Volume Rural Roadways
DOT National Transportation Integrated Search
1998-09-01
Bridges are a necessary part of any roadway system. Their construction requires a more sophisticated engineering design analysis and a higher construction cost than that for the roadways connecting them. Until relatively recently, bridge width on low...
Astronauts Hoffman and Musgrave monitor Neutral Buoyancy Simulator training
1993-06-15
Astronauts Jeffrey A. Hoffman (far left) and F. Story Musgrave (second left) monitor a training session from consoles in the control room for the Neutral Buoyancy Simulator (NBS) at the Marshall Space Flight Center (MSFC). Seen underwater in the NBS on the big screen and the monitors at the consoles is astronaut Thomas D. Akers. The three mission specialists, along with astronaut Kathryn C. Thornton, are scheduled to be involved in a total of five sessions of extravehicular activity (EVA) to service the Hubble Space Telescope (HST) in orbit during the STS-61 mission, scheduled for December 1993.
Instrumentation, monitoring, and modeling of the I-35W bridge.
DOT National Transportation Integrated Search
2012-08-01
The new I-35W Bridge was instrumented incorporating "smart bridge technology" by Figg Engineering Group in : conjunction with Flatiron-Manson. The purpose of the instrumentation was to monitor the structure during service, : and to use this informati...
23 CFR 661.51 - Can IRRBP funds be used for the approach roadway to a bridge?
Code of Federal Regulations, 2011 CFR
2011-04-01
... bridge? 661.51 Section 661.51 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.51 Can IRRBP funds be used for the approach roadway to a bridge? (a) Yes, costs associated with approach roadway work, as defined in...
16. The Baltimore & Ohio R.R System, Division BaltimoreEast, Bridge ...
16. The Baltimore & Ohio R.R System, Division Baltimore-East, Bridge No 13-A, Branch Philadelphia. Baltimore: Office of Engineer of Bridges, 1945. Copy of drawing located at the Baltimore County Department of Public Works, Towson, Maryland. - Allender Road Bridge, Spanning CSX Transportation railroad tracks at Allender Road, White Marsh, Baltimore County, MD
23 CFR 661.51 - Can IRRBP funds be used for the approach roadway to a bridge?
Code of Federal Regulations, 2010 CFR
2010-04-01
... bridge? 661.51 Section 661.51 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.51 Can IRRBP funds be used for the approach roadway to a bridge? (a) Yes, costs associated with approach roadway work, as defined in...
Evaluation of abutment scour prediction equations with field data
Benedict, S.T.; Deshpande, N.; Aziz, N.M.
2007-01-01
The U.S. Geological Survey, in cooperation with FHWA, compared predicted abutment scour depths, computed with selected predictive equations, with field observations collected at 144 bridges in South Carolina and at eight bridges from the National Bridge Scour Database. Predictive equations published in the 4th edition of Evaluating Scour at Bridges (Hydraulic Engineering Circular 18) were used in this comparison, including the original Froehlich, the modified Froehlich, the Sturm, the Maryland, and the HIRE equations. The comparisons showed that most equations tended to provide conservative estimates of scour that at times were excessive (as large as 158 ft). Equations also produced underpredictions of scour, but with less frequency. Although the equations provide an important resource for evaluating abutment scour at bridges, the results of this investigation show the importance of using engineering judgment in conjunction with these equations.
5. HISTORIC PHOTOGRAPH OF FIRST CHRISTINE FALLS BRIDGE, BUILT BY ...
5. HISTORIC PHOTOGRAPH OF FIRST CHRISTINE FALLS BRIDGE, BUILT BY U.S. ARMY CORPS OF ENGINEERS CA. 1908. PHOTOGRAPHER TAKEN 1911. MOUNT RAINIER NATIONAL PARK ARCHIVES - Christine Falls Bridge, Spanning Van Trump Creek on Nisqually Road, Longmire, Pierce County, WA
Estimating the residual axial load capacity of flexure-dominated reinforced concrete bridge columns.
DOT National Transportation Integrated Search
2014-08-01
Extreme events such as earthquakes have the potential to damage hundreds, if not thousands, of bridges on a : transportation network. Following an earthquake, the damaged bridges are inspected by engineers sequentially to : decide whether or not to c...
Zwawi, Mohammed A; Moslehy, Faissal A; Rose, Christopher; Huayamave, Victor; Kassab, Alain J; Divo, Eduardo; Jones, Brendan J; Price, Charles T
2017-08-01
This study utilized a computational biomechanical model and applied the least energy path principle to investigate two pathways for closed reduction of high grade infantile hip dislocation. The principle of least energy when applied to moving the femoral head from an initial to a final position considers all possible paths that connect them and identifies the path of least resistance. Clinical reports of severe hip dysplasia have concluded that reduction of the femoral head into the acetabulum may occur by a direct pathway over the posterior rim of the acetabulum when using the Pavlik harness, or by an indirect pathway with reduction through the acetabular notch when using the modified Hoffman-Daimler method. This computational study also compared the energy requirements for both pathways. The anatomical and muscular aspects of the model were derived using a combination of MRI and OpenSim data. Results of this study indicate that the path of least energy closely approximates the indirect pathway of the modified Hoffman-Daimler method. The direct pathway over the posterior rim of the acetabulum required more energy for reduction. This biomechanical analysis confirms the clinical observations of the two pathways for closed reduction of severe hip dysplasia. The path of least energy closely approximated the modified Hoffman-Daimler method. Further study of the modified Hoffman-Daimler method for reduction of severe hip dysplasia may be warranted based on this computational biomechanical analysis. © 2016 The Authors. Journal of Orthopaedic Research Published by Wiley Periodicals, Inc. on behalf of Orthopaedic Research Society. J Orthop Res 35:1799-1805, 2017. © 2016 The Authors. Journal of Orthopaedic Research Published by Wiley Periodicals, Inc. on behalf of Orthopaedic Research Society.
19. Photographer unknown, circa 1950 'THE LOOP OVER' BRIDGE WAS ...
19. Photographer unknown, circa 1950 'THE LOOP OVER' BRIDGE WAS CONSTRUCTED ON NEWFOUND GAP ROAD TO REPLACE A SERIES OF DANGEROUS SWITCHBACKS. THIS ENGINEERING FEATURE QUICKLY BECAME A POPULAR TOURIST ATTRACTION. - Great Smoky Mountains National Park Roads & Bridges, Gatlinburg, Sevier County, TN
49 CFR 237.57 - Designations of individuals.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Designations of individuals. 237.57 Section 237.57... § 237.57 Designations of individuals. Each track owner shall designate those individuals qualified as railroad bridge engineers, railroad bridge inspectors and railroad bridge supervisors. Each individual...
DOT National Transportation Integrated Search
2009-11-01
Several hundred Florida bridges span waterways deep enough for barge traffic. To ensure a bridge is capable of withstanding the potential impact of a barge collision, engineers use design specifications recommended by the American Association of Stat...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false After a bridge project has been completed (either PE or... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.41 After a bridge project has been completed (either PE or construction) what happens with...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false How will a bridge project be programmed for funding once... TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.23 How will a bridge project be programmed for funding once eligibility has been determined? (a) All projects will be...
Monitoring the performance of timber bridges over the long term
James P. Wacker; Marc R. Joyal; Joseph F. Murphy; Xiping Wang
2007-01-01
Timber bridges are often viewed by engineers as less durable than steel or concrete structures. However, they remain a durable and economical option along secondary roads in many rural areas of the country. With well over 75,000 bridges listed by the Federal Highway Administrationâs National Bridge Inventory as having timber superstructures as of 2002, they represent...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false How will a bridge project be programmed for funding once... TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.23 How will a bridge project be programmed for funding once eligibility has been determined? (a) All projects will be...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false After a bridge project has been completed (either PE or... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.41 After a bridge project has been completed (either PE or construction) what happens with...
ERIC Educational Resources Information Center
Reisel, John R.; Jablonski, Marissa; Hosseini, Hossein; Munson, Ethan
2012-01-01
A summer bridge program for incoming engineering and computer science freshmen has been used at the University of Wisconsin-Milwaukee from 2007 to 2010. The primary purpose of this program has been to improve the mathematics course placement for incoming students who initially place into a course below Calculus I on the math placement examination.…
46 CFR 112.43-7 - Navigating bridge distribution panel.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Navigating bridge distribution panel. 112.43-7 Section 112.43-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Lighting Systems § 112.43-7 Navigating bridge distribution...
46 CFR 112.43-7 - Navigating bridge distribution panel.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Navigating bridge distribution panel. 112.43-7 Section 112.43-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Lighting Systems § 112.43-7 Navigating bridge distribution...
46 CFR 112.43-7 - Navigating bridge distribution panel.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Navigating bridge distribution panel. 112.43-7 Section 112.43-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING EMERGENCY LIGHTING AND POWER SYSTEMS Emergency Lighting Systems § 112.43-7 Navigating bridge distribution...
Virtual Bridge Design Challenge
ERIC Educational Resources Information Center
Mitts, Charles R.
2013-01-01
This design/problem-solving activity challenges students to design a replacement bridge for one that has been designated as either structurally deficient or functionally obsolete. The Aycock MS Technology/STEM Magnet Program Virtual Bridge Design Challenge is an authentic introduction to the engineering design process. It is a socially relevant…
STS-35 MS Hoffman and PS Durrance on OV-102's middeck for 'Space Classroom'
NASA Technical Reports Server (NTRS)
1990-01-01
STS-35 Mission Specialist (MS) Jeffrey A. Hoffman (mustache) and Payload Specialist (PS) Samuel T. Durrance conduct 'Space Classroom Assignment: The Stars' on the middeck of Columbia, Orbiter Vehicle (OV) 102. These crewmembers are giving students a lesson on the electromagnetic spectrum. Displayed behind them on the orbiter galley is a chart showing the range of light visible by each telescope that is operating in OV-102's payload bay (PLB) during the Astronomy Laboratory 1 (ASTRO-1) mission. Live television allowed the space experts to give real-time observations and commentaries to the Earth-based academic audiences.
Code of Federal Regulations, 2011 CFR
2011-04-01
... bridge if the Indian Tribe does not support the project? 661.59 Section 661.59 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.59 What should be done with a deficient BIA owned IRR bridge if the Indian Tribe does not...
27. RAILROAD, RR. BRIDGE MISSISSIPPI, CLAY CO. WAVERLY 1.5 mi. ...
27. RAILROAD, RR. BRIDGE MISSISSIPPI, CLAY CO. WAVERLY 1.5 mi. S of MS. 50 Stress Sheet of 1888 Bridge: Conroy & Sinks, Consulting Engineers, Chicago. July 21, 1910. DWG #978. Act. size around border: 18x11 in. Credit: Columbus and Greenville RR, Columbus, Ms. Sarcone Photography, Columbus, Ms. Sep 1978. - Bridges of the Upper Tombigbee River Valley, Columbus, Lowndes County, MS
Code of Federal Regulations, 2010 CFR
2010-04-01
... bridge if the Indian Tribe does not support the project? 661.59 Section 661.59 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.59 What should be done with a deficient BIA owned IRR bridge if the Indian Tribe does not...
DOT National Transportation Integrated Search
2010-01-01
Current AASHTO provisions for the conventional load rating of flat slab bridges rely on the equivalent strip method : of analysis for determining live load effects, this is generally regarded as overly conservative by many professional : engineers. A...
De Santis, Roberto; Gloria, Antonio; Russo, Teresa; D'Amora, Ugo; Varriale, Angelo; Veltri, Mario; Balleri, Piero; Mollica, Francesco; Riccitiello, Francesco; Ambrosio, Luigi
2014-12-18
This study aimed at investigating the effects of titanium implants and different configurations of full-arch prostheses on the biomechanics of edentulous mandibles. Reverse engineered, composite, anisotropic, edentulous mandibles made of a poly(methylmethacrylate) core and a glass fibre reinforced outer shell were rapid prototyped and instrumented with strain gauges. Brånemark implants RP platforms in conjunction with titanium Procera one-piece or two-piece bridges were used to simulate oral rehabilitations. A lateral load through the gonion regions was used to test the biomechanical effects of the rehabilitations. In addition, strains due to misfit of the one-piece titanium bridge were compared to those produced by one-piece cast gold bridges. Milled titanium bridges had a better fit than cast gold bridges. The stress distribution in mandibular bone rehabilitated with a one-piece bridge was more perturbed than that observed with a two-piece bridge. In particular the former induced a stress concentration and stress shielding in the molar and symphysis regions, while for the latter design these stresses were strongly reduced. In conclusion, prosthetic frameworks changed the biomechanics of the mandible as a result of both their design and manufacturing technology. Copyright © 2014 Elsevier Ltd. All rights reserved.
33 CFR Appendix B to Part 277 - Hypothetical Example of Cost Apportionment
Code of Federal Regulations, 2013 CFR
2013-07-01
...) $165,489 I b. Fixed charges (owner's share) 284,460 II A fixed charge such as engineering, design and... new bridge is designed for increased loading and width greater than that of the old bridge. Therefore, the estimated annual maintenance cost was based on a hypothetical bridge designed, but not constructed...
33 CFR Appendix B to Part 277 - Hypothetical Example of Cost Apportionment
Code of Federal Regulations, 2014 CFR
2014-07-01
...) $165,489 I b. Fixed charges (owner's share) 284,460 II A fixed charge such as engineering, design and... new bridge is designed for increased loading and width greater than that of the old bridge. Therefore, the estimated annual maintenance cost was based on a hypothetical bridge designed, but not constructed...
33 CFR Appendix B to Part 277 - Hypothetical Example of Cost Apportionment
Code of Federal Regulations, 2010 CFR
2010-07-01
...) $165,489 I b. Fixed charges (owner's share) 284,460 II A fixed charge such as engineering, design and... new bridge is designed for increased loading and width greater than that of the old bridge. Therefore, the estimated annual maintenance cost was based on a hypothetical bridge designed, but not constructed...
33 CFR Appendix B to Part 277 - Hypothetical Example of Cost Apportionment
Code of Federal Regulations, 2011 CFR
2011-07-01
...) $165,489 I b. Fixed charges (owner's share) 284,460 II A fixed charge such as engineering, design and... new bridge is designed for increased loading and width greater than that of the old bridge. Therefore, the estimated annual maintenance cost was based on a hypothetical bridge designed, but not constructed...
33 CFR Appendix B to Part 277 - Hypothetical Example of Cost Apportionment
Code of Federal Regulations, 2012 CFR
2012-07-01
...) $165,489 I b. Fixed charges (owner's share) 284,460 II A fixed charge such as engineering, design and... new bridge is designed for increased loading and width greater than that of the old bridge. Therefore, the estimated annual maintenance cost was based on a hypothetical bridge designed, but not constructed...
A distributed cloud-based cyberinfrastructure framework for integrated bridge monitoring
NASA Astrophysics Data System (ADS)
Jeong, Seongwoon; Hou, Rui; Lynch, Jerome P.; Sohn, Hoon; Law, Kincho H.
2017-04-01
This paper describes a cloud-based cyberinfrastructure framework for the management of the diverse data involved in bridge monitoring. Bridge monitoring involves various hardware systems, software tools and laborious activities that include, for examples, a structural health monitoring (SHM), sensor network, engineering analysis programs and visual inspection. Very often, these monitoring systems, tools and activities are not coordinated, and the collected information are not shared. A well-designed integrated data management framework can support the effective use of the data and, thereby, enhance bridge management and maintenance operations. The cloud-based cyberinfrastructure framework presented herein is designed to manage not only sensor measurement data acquired from the SHM system, but also other relevant information, such as bridge engineering model and traffic videos, in an integrated manner. For the scalability and flexibility, cloud computing services and distributed database systems are employed. The information stored can be accessed through standard web interfaces. For demonstration, the cyberinfrastructure system is implemented for the monitoring of the bridges located along the I-275 Corridor in the state of Michigan.
Strengthening steel bridge girders using CFRP.
DOT National Transportation Integrated Search
2010-06-01
While traditional retrofitting methods for steel bridge girders could be time consuming and uneconomical, an alternative repair method is suggested using Carbon Fiber Reinforced Polymers (CFRP) laminate strips, providing engineers with a competitive ...
24. Photocopy of photograph appearing in August, 1928 issue of ...
24. Photocopy of photograph appearing in August, 1928 issue of the Reading Railroad Magazine. Caption reads: 'Harrisburg Division--Engine & Crew On A New Bridge Along the Steelton Branch.' From its appearance, this bridge (now demolished) is obviously another example of the Reading-Halls Bridge design. Note the bents used to support the trusses at points between the bridge abutments, enabling the bridge to carry loads far heavier than any it was designed to bear in the mid-nineteenth century. - Reading-Halls Station Bridge, U.S. Route 220, spanning railroad near Halls Station, Muncy, Lycoming County, PA
Assuring bridge safety and serviceability in Europe
DOT National Transportation Integrated Search
2010-08-01
U.S. engineers need advanced tools and protocols to better assess and assure safety and serviceability of bridges. The Federal Highway Administration, American Association of State Highway and Transportation Officials, and National Cooperative Highwa...
NASA Technical Reports Server (NTRS)
Saini, Subhash; Hood, Robert T.; Chang, Johnny; Baron, John
2016-01-01
We present a performance evaluation conducted on a production supercomputer of the Intel Xeon Processor E5- 2680v3, a twelve-core implementation of the fourth-generation Haswell architecture, and compare it with Intel Xeon Processor E5-2680v2, an Ivy Bridge implementation of the third-generation Sandy Bridge architecture. Several new architectural features have been incorporated in Haswell including improvements in all levels of the memory hierarchy as well as improvements to vector instructions and power management. We critically evaluate these new features of Haswell and compare with Ivy Bridge using several low-level benchmarks including subset of HPCC, HPCG and four full-scale scientific and engineering applications. We also present a model to predict the performance of HPCG and Cart3D within 5%, and Overflow within 10% accuracy.
16. 'Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, ...
16. 'Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, California, A.J. Logan, County Surveyor, H.J. Brunnier, Consulting Engineer, March 7, 1919,' showing detail of floor beam at central pier, half section of cantilever slab at end of bridge, floor beam end panels, slab reinforcing, plan of slab reinforcing, diagram of slab bars, typical floor girder. - Salt River Bridge, Spanning Salt River at Dillon Road, Ferndale, Humboldt County, CA
Comparative durability of timber bridges in the USA
James P. Wacker; Brian K. Brashaw
2017-01-01
As engineers begin to utilize life-cycle-cost design approaches for timber bridges, there is a necessity for more reliable data about their durability and expected service life. This paper summarizes a comprehensive effort to assess the current condition of more than one hundred timber highway bridge superstructures throughout the United States. This national study was...
Overview of the national historic covered bridge preservation (NHCBP) program
James P. Wacker; Sheila Rimal Duwadi
2010-01-01
Covered wooden bridges proliferated in the United States in the mid-nineteenth century. Today an estimated 800 covered bridge structures remain, but they are nevertheless cherished links to the technological heritage of the United States. The through-truss designs vary from the Kingpost trusses built in the craft tradition to the engineered Burr arch and Paddleford...
17. "Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, ...
17. "Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, California, A.J. Logan, County Surveyor, H.J. Brunnier, Consulting Engineer, March 7, 1919," showing plan of bars in top flange, elevation of girder reinforcement, plan of bars in bottom flange - Salt River Bridge, Spanning Salt River at Dillon Road, Ferndale, Humboldt County, CA
15. 'Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, ...
15. 'Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, California, A.J. Logan, County Surveyor, H.J. Brunnier, Consulting Engineer, March 7, 1919,' showing general plan, plan of top chord, elevation of main girder, transverse section, plan section at deck level. - Salt River Bridge, Spanning Salt River at Dillon Road, Ferndale, Humboldt County, CA
18. "Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, ...
18. "Concrete Bridge Over Salt River, Port Kenyon, Humboldt County, California, A.J. Logan, County Surveyor, H.J. Brunnier, Consulting Engineer, March 7, 1919," showing elevation of center pier, elevation and plan of north and south abutments, sections of abutments, pier, and pier footings - Salt River Bridge, Spanning Salt River at Dillon Road, Ferndale, Humboldt County, CA
The Case for Summer Bridge: Building Social and Cultural Capital for Talented Black STEM Students
ERIC Educational Resources Information Center
Stolle-McAllister, Kathleen
2011-01-01
This study uses focus groups to examine the importance of a pre-college summer bridge program for highly talented black students in science, technology, engineering, and mathematics (STEM). Longitudinal data were collected from 134 participants who identified three aspects of Summer Bridge that were particularly helpful: academic, social, and…
Service life assessment of timber highway bridges in USA climate zones
James P. Wacker; Brian K. Brashaw; Thomas G. Williamson; P. David Jones; Matthew S. Smith; Travis K. Hosteng; David L. Strahl; Lola E. Coombe; V.J. Gopu
2014-01-01
As engineers begin to estimate life-cycle costs and sustainable design approaches for timber bridges, there is a need for more reliable data about their durability and expected service life. This paper summarizes a comprehensive effort to assess the current condition of more than one hundred timber highway bridge superstructures throughout the United States. This...
2000-04-14
Center Director Roy Bridges (left) dons protective apron, gloves and face shield before the "ribbon-breaking" to open the new Cryogenic Testbed Facility. Part of the normal ceremonial ribbon was replaced with plastic tubing and frozen in liquid nitrogen for the event. Bridges hit the tubing with a small hammer to break it. The Cryogenics Testbed was built to provide cryogenics engineering development and testing services to meet the needs of industry. It will also support commercial, government and academic customers for technology development initiatives on the field of cryogenics. The facility is jointly managed by NASA and Dynacs Engineering Co. , NASA/SC's Engineering Development contractor
2000-04-14
Center Director Roy Bridges (left), wearing protective apron, gloves and face shield, watches as liquid nitrogen is poured into a container to freeze the plastic tubing for a special "ribbon-breaking" to open the new Cryogenic Testbed Facility. Bridges hit the section of tubing with a small hammer to break it. The Cryogenics Testbed was built to provide cryogenics engineering development and testing services to meet the needs of industry. It will also support commercial, government and academic customers for technology development initiatives on the field of cryogenics. The facility is jointly managed by NASA and Dynacs Engineering Co. , NASA/SC's Engineering Development contractor
2000-04-14
Center Director Roy Bridges (center) is congratulated for the successful breaking of the ceremonial "ribbon" and the opening of the new Cryogenic Testbed Facility. Part of the normal ribbon was replaced with plastic tubing and frozen in liquid nitrogen for the event. Bridges hit the tubing with a small hammer to break it. The Cryogenics Testbed was built to provide cryogenics engineering development and testing services to meet the needs of industry. It will also support commercial, government and academic customers for technology development initiatives on the field of cryogenics. The facility is jointly managed by NASA and Dynacs Engineering Co. , NASA/SC's Engineering Development contractor
6. Photocopy of photograph (Original print in possession of the ...
6. Photocopy of photograph (Original print in possession of the Division of Mechanical and Civil Engineering, Smithsonian Institute) SIMILAR BRIDGE IN FRAMINGHAM MASSACHUSETTS - Elm Street Bridge, Spanning Ottauquechee River, Woodstock, Windsor County, VT
7. Photocopy of photograph (original in possession of the Division ...
7. Photocopy of photograph (original in possession of the Division of Mechanical and Civil Engineering, Smithsonian Institute) PARKER TRUSS BRIDGE IN MAINE - Elm Street Bridge, Spanning Ottauquechee River, Woodstock, Windsor County, VT
8. Photocopy of photograph (Original in possesssion of the Division ...
8. Photocopy of photograph (Original in possesssion of the Division of Mechanical and Cicil Engineering, Smithsonian Institute) PARKER TRUSS BRIDGE IN NORTHFIELD, VT - Elm Street Bridge, Spanning Ottauquechee River, Woodstock, Windsor County, VT
Selling Technical Sales to Engineering Learners
ERIC Educational Resources Information Center
Bumblauskas, Daniel P.; Carberry, Adam R.; Sly, David P.
2017-01-01
Sales engineering or technical sales programs bridge engineering and business to educate engineering students in sales specific to their discipline. Students develop business awareness through such programs, providing the sales workforce with technically knowledgeable salespeople. The following study analyzed cohorts of students enrolled in a…
48 CFR 31.105 - Construction and architect-engineer contracts.
Code of Federal Regulations, 2014 CFR
2014-10-01
...-engineer contracts. 31.105 Section 31.105 Federal Acquisition Regulations System FEDERAL ACQUISITION... Construction and architect-engineer contracts. (a) This category includes all contracts and contract..., bridges, roads, or other kinds of real property. It also includes architect-engineer contracts related to...
48 CFR 31.105 - Construction and architect-engineer contracts.
Code of Federal Regulations, 2011 CFR
2011-10-01
...-engineer contracts. 31.105 Section 31.105 Federal Acquisition Regulations System FEDERAL ACQUISITION... Construction and architect-engineer contracts. (a) This category includes all contracts and contract..., bridges, roads, or other kinds of real property. It also includes architect-engineer contracts related to...
48 CFR 31.105 - Construction and architect-engineer contracts.
Code of Federal Regulations, 2012 CFR
2012-10-01
...-engineer contracts. 31.105 Section 31.105 Federal Acquisition Regulations System FEDERAL ACQUISITION... Construction and architect-engineer contracts. (a) This category includes all contracts and contract..., bridges, roads, or other kinds of real property. It also includes architect-engineer contracts related to...
48 CFR 31.105 - Construction and architect-engineer contracts.
Code of Federal Regulations, 2013 CFR
2013-10-01
...-engineer contracts. 31.105 Section 31.105 Federal Acquisition Regulations System FEDERAL ACQUISITION... Construction and architect-engineer contracts. (a) This category includes all contracts and contract..., bridges, roads, or other kinds of real property. It also includes architect-engineer contracts related to...
MCEER, from Earthquake Engineering to Extreme Events | Home Page
Center Report Series Education Education Home Bridge Engineering Guest Speaker Series Connecte²d Teaching CSEE Graduate Student Poster Competition Earthquake Engineering Education in Haiti Earthquakes : FAQ's Engineering Seminar Series K-12 STEM Education National Engineers Week Research Experiences for
1981-03-01
to retain some of its aesthetic quality. Important bridges were also being constructed outside of France. The Westminister Bridge (1738-50) was built... Legislative Session. It was eventually to connect the waters of Mobile Bay with the Coosa River at Wetumpka, and eventually with the Tennessee. The project...Bridge Act of 1927 were important legislative aids. The state act resulted in the construction of fifteen major bridges, including the attractive
Rice L, Jung M. Neutrophilic leukocytosis, neutropenia, monocytosis, and monocytopenia. In: Hoffman R, Benz EJ Jr, Silberstein LE, Heslop HE, Weitz JI, Anastasi J, eds. Hematology: Basic Principles and ...
NASA Astrophysics Data System (ADS)
Flaga, Kazimierz; Furtak, Kazimierz
2015-03-01
Steel-concrete composite structures have been used in bridge engineering from decades. This is due to rational utilisation of the strength properties of the two materials. At the same time, the reinforced concrete (or prestressed) deck slab is more favourable than the orthotropic steel plate used in steel bridges (higher mass, better vibration damping, longer life). The most commonly found in practice are composite girder bridges, particularly in highway bridges of small and medium spans, but the spans may reach over 200 m. In larger spans steel truss girders are applied. Bridge composite structures are also employed in cable-stayed bridge decks of the main girder spans of the order of 600, 800 m. The aim of the article is to present the cionstruction process and strength analysis problems concerning of this type of structures. Much attention is paid to the design and calculation of the shear connectors characteristic for the discussed objects. The authors focused mainly on the issues of single composite structures. The effect of assembly states on the stresses and strains in composite members are highlighted. A separate part of problems is devoted to the influence of rheological factors, i.e. concrete shrinkage and creep, as well as thermal factors on the stresses and strains and redistribution of internal forces.
1982-01-01
illustrate MERADCOM’s missio and continued growth as an independent subordinate Command. MERADCOM- DIVERSIFCATION IN SCIECE AND ENGINEERING COUNETEREIEE...Magnetic Signature Duplicator!1 Pre- staged Ammo Loading System Portable Mine Neutralization SystemN;- . Heavy Assault Bridge Composite Bridge Components
Suspension Bridges: A Merger of Physics, Engineering, and Art
ERIC Educational Resources Information Center
Greenslade, Thomas B., Jr.
1974-01-01
Discusses the physical principles underlying the design of a small scale suspension bridge, including its types and strength calculations. Included are the working equation and two formulas for determining the load per unit length. (CC)
Research notes : faster load rating for steel truss bridges.
DOT National Transportation Integrated Search
2009-03-01
The Oregon Department of Transportation (ODOT) Bridge Engineering Section recently completed a project with Oregon State University to develop a viable, more cost-effective alternative to the manually collected field measurement procedure. The new me...
Axle equivalent transverse loading on segmental bridge decks.
DOT National Transportation Integrated Search
2014-04-01
For a prestressed concrete segmental box girder bridge, both design and load rating are determined by : longitudinal and transverse analyses. A transverse analysis is performed for the top slab, typically by : using Homberg charts (an engineers de...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false How will a bridge project be programmed for funding once eligibility has been determined? 661.23 Section 661.23 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.23 How will a...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false How will a bridge project be programmed for funding once eligibility has been determined? 661.23 Section 661.23 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.23 How will a...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false How will a bridge project be programmed for funding once eligibility has been determined? 661.23 Section 661.23 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.23 How will a...
Final Environmental Assessment, Horse Creek Bridge Replacement
2010-10-01
Final Environmental Assessment Horse Creek Bridge Replacement 78th Civil Engineer Group...Final Environmental Assessment Horse Creek Bridge Replacement 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d...Form 298 (Rev. 8-98) Prescribed by ANSI Std Z39-18 FINDING OF NO SIGNIFICANT IMPACT (FONSI)/ FINDING OF NO PRACTICABLE ALTERNATIVE (FONP A) HORSE
Positron scattering from carbon dioxide
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zecca, Antonio; Perazzolli, Chiara; Moser, Norberto
2006-07-15
We report total cross section measurements for positron scattering from carbon dioxide (CO{sub 2}). The energy range of the present measurements is 0.1-20.0 eV. The present study is undertaken to both try and resolve a discrepancy in the literature between the earlier low-energy works of Hoffman et al. [Phys. Rev. A 25, 1393 (1982)] and Kimura et al. [J. Chem. Phys. 107, 6616 (1997)], and to extend the available data to lower energies. We find generally good agreement with the data of Hoffman et al. over the common experimental energy range. A comparison of the present data with available calculationsmore » is also made, as is a comparison with corresponding electron total cross section data.« less
Study on Construction Technology of Municipal Road and Bridge Concrete
NASA Astrophysics Data System (ADS)
Tang, Fuyong
2018-03-01
With the continuous development of social economy and the accelerating process of urbanization, municipal road and bridge projects have also shown a trend of rapid development. Municipal road and bridge work can fully reflect the economic and cultural development level of cities and is also an important symbol of urban development. As a basic material of construction, concrete is widely used in engineering construction. This article will analyze the municipal road and bridge concrete construction technology, put forward corresponding measures.
2016-11-18
Space Shuttle mission STS-61 onboard view taken by a fish-eyed camera lens showing astronauts Story Musgrave and Jeffrey Hoffman's Extra Vehicular Activity (EVA) to repair the Hubble Space Telescope (HST).
Assessing the vulnerability of Delaware's coastal bridges to hurricane forces.
DOT National Transportation Integrated Search
2008-01-01
There exists a need for new guidelines to address the threat of hurricane : forces to coastal bridges. Researchers at the University of Florida, Ocean Engineering : Associates, Inc., Modjeski and Masters, Inc., Moffatt & Nichol, and the Federal : Hig...
11. DETAIL VIEW OF WELDED DATES 1896/1941 (S.E. CORNER) ...
11. DETAIL VIEW OF WELDED DATES - 1896/1941 (S.E. CORNER) 3 Photocopies of drawings labeled 'Bridge Rating Program by Boswell Engineering Company - Abbett Avenue Bridge, Spanning Whippany River at Abbett Avenue, Morristown, Morris County, NJ
Code of Federal Regulations, 2010 CFR
2010-04-01
... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.413 Funding. (a) Funds... the same period as funds apportioned for projects on the Federal-aid primary system. (b) The Federal...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Policy. 650.803 Section 650.803 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND... and vehicular protective and warning systems on bridges subject to ship collisions. ...
Total surface selective removal of concrete utilizing hydrodemolition.
DOT National Transportation Integrated Search
2014-07-01
As an engineer with the Missouri Department of Transportation, spending over 26 years in field : bridge maintenance and inspection, I have had the chance to participate in the evaluation of : many products and processes related to bridge repairs. Wit...
Theoretical mechanics: crowd synchrony on the Millennium Bridge.
Strogatz, Steven H; Abrams, Daniel M; McRobie, Allan; Eckhardt, Bruno; Ott, Edward
2005-11-03
Soon after the crowd streamed on to London's Millennium Bridge on the day it opened, the bridge started to sway from side to side: many pedestrians fell spontaneously into step with the bridge's vibrations, inadvertently amplifying them. Here we model this unexpected and now notorious phenomenon--which was not due to the bridge's innovative design as was first thought--by adapting ideas originally developed to describe the collective synchronization of biological oscillators such as neurons and fireflies. Our approach should help engineers to estimate the damping needed to stabilize other exceptionally crowded footbridges against synchronous lateral excitation by pedestrians.
15. Photocopy of drawing, truss elevations, Bridge No. 79B, Main ...
15. Photocopy of drawing, truss elevations, Bridge No. 79B, Main & Washington Sts., So. Norwalk, Ct., N. Y. Division, N.Y., N.H. and H.R.R., dated April 21, 1895. Original on file with Construction Management and Facilities Engineering Department, Metro North Commuter Railroad, 420 Lexington Avenue, New York, N.Y. - South Norwalk Railroad Bridge, South Main & Washington Streets, Norwalk, Fairfield County, CT
1. Front view of steam engine and mill, looking NE, ...
1. Front view of steam engine and mill, looking NE, showing (l to r) 6-column beam engine, flywheel, reduction gears and 3-roll cane mill. - Hacienda Azucarera La Esperanza, Steam Engine & Mill, 2.65 Mi. N of PR Rt. 2 Bridge over Manati River, Manati, Manati Municipio, PR
From Bridges and Rockets, Lessons for Software Systems
NASA Technical Reports Server (NTRS)
Holloway, C. Michael
2004-01-01
Although differences exist between building software systems and building physical structures such as bridges and rockets, enough similarities exist that software engineers can learn lessons from failures in traditional engineering disciplines. This paper draws lessons from two well-known failures the collapse of the Tacoma Narrows Bridge in 1940 and the destruction of the space shuttle Challenger in 1986 and applies these lessons to software system development. The following specific applications are made: (1) the verification and validation of a software system should not be based on a single method, or a single style of methods; (2) the tendency to embrace the latest fad should be overcome; and (3) the introduction of software control into safety-critical systems should be done cautiously.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lombardi, A., E-mail: a2lombar@ryerson.ca; D'Elia, F.; Ravindran, C.
2014-01-15
In recent years, aluminum alloy gasoline engine blocks have in large part successfully replaced nodular cast iron engine blocks, resulting in improved vehicle fuel efficiency. However, because of the inadequate wear resistance properties of hypoeutectic Al–Si alloys, gray iron cylinder liners are required. These liners cause the development of large tensile residual stress along the cylinder bores and necessitate the maximization of mechanical properties in this region to prevent premature engine failure. The aim of this study was to replicate the engine cylinder bridge microstructure and mechanical properties following TSR treatment (which removes the sand binder to enable easy castingmore » retrieval) using lab scale billet castings of the same alloy composition with varying cooling rates. Comparisons in microstructure between the engine block and the billet castings were carried out using optical and scanning electron microscopy, while mechanical properties were assessed using tensile testing. The results suggest that the microstructure at the top and middle of the engine block cylinder bridge was successfully replicated by the billet castings. However, the microstructure at the bottom of the cylinder was not completely replicated due to variations in secondary phase morphology and distribution. The successful replication of engine block microstructure will enable the future optimization of heat treatment parameters. - Highlights: • A method to replicate engine block microstructure was developed. • Billet castings will allow cost effective optimization of heat treatment process. • The replication of microstructure in the cylinder region was mostly successful. • Porosity was more clustered in the billet castings compared to the engine block. • Mechanical properties were lower in billet castings due to porosity and inclusions.« less
Rural roads and bridges : condition and status of roads
DOT National Transportation Integrated Search
1996-09-01
Report examines the conditions of roads and bridges maintained by local governments. It is based on 609 responses from towns and 1961 from counties to mailed survey questionnaires in country engineers and town/township governments in Fall 1994 and Sp...
Effect of design parameters on the dynamic response of bridges.
DOT National Transportation Integrated Search
2000-06-01
Engineers and researchers have long recognized the importance of vehicle-induced vibration with regard to the response and service life of bridges. In spite of the recognition of the importance and role of dynamic response in deterioration and fatigu...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Purpose. 650.301 Section 650.301 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... national standards for the proper safety inspection and evaluation of all highway bridges in accordance...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Purpose. 650.301 Section 650.301 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... national standards for the proper safety inspection and evaluation of all highway bridges in accordance...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Purpose. 650.301 Section 650.301 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... national standards for the proper safety inspection and evaluation of all highway bridges in accordance...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Purpose. 650.301 Section 650.301 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... national standards for the proper safety inspection and evaluation of all highway bridges in accordance...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Purpose. 650.301 Section 650.301 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... national standards for the proper safety inspection and evaluation of all highway bridges in accordance...
BATS IN AMERICAN BRIDGES: RESOURCE PUBLICATION NO. 4
DOT National Transportation Integrated Search
1999-01-01
Bridges and culverts were evaluated as bat roosting habitat in 25 states at elevations from sea level to 10,000 feet. Field surveys were conducted at 2,421 highway structures. Scientific literature was reviewed, and local biologists and engineers wer...
23 CFR 661.21 - When is a bridge eligible for rehabilitation?
Code of Federal Regulations, 2014 CFR
2014-04-01
... Section 661.21 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND... eligible for rehabilitation may be replaced if the life cycle cost analysis is conducted which shows the cost for bridge rehabilitation exceeds the replacement cost. ...
23 CFR 661.21 - When is a bridge eligible for rehabilitation?
Code of Federal Regulations, 2013 CFR
2013-04-01
... Section 661.21 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND... eligible for rehabilitation may be replaced if the life cycle cost analysis is conducted which shows the cost for bridge rehabilitation exceeds the replacement cost. ...
23 CFR 661.21 - When is a bridge eligible for rehabilitation?
Code of Federal Regulations, 2012 CFR
2012-04-01
... Section 661.21 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND... eligible for rehabilitation may be replaced if the life cycle cost analysis is conducted which shows the cost for bridge rehabilitation exceeds the replacement cost. ...
A survey of waterproofing membrane systems for bridge decks.
DOT National Transportation Integrated Search
1972-01-01
This survey was concerned with only a few of the many waterproof systems available for sealing concrete bridge decks, and made use of personal contacts with engineers of other highway agencies. The information gathered indicated that there were sever...
Bridge deck cracking and composite action analyses : final report, March 2010.
DOT National Transportation Integrated Search
2010-03-01
According to the American Society of Civil Engineers Report Card (ASCE, 2005), United States infrastructure received a grade point average of "D"(i.e., poor rating) in 2005. Moreover, the National Bridge Inventory (Federal Highway Administration, 200...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Funding. 650.413 Section 650.413 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.413 Funding. (a) Funds...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Funding. 650.413 Section 650.413 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.413 Funding. (a) Funds...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Funding. 650.413 Section 650.413 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.413 Funding. (a) Funds...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Funding. 650.413 Section 650.413 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Highway Bridge Replacement and Rehabilitation Program § 650.413 Funding. (a) Funds...
FHWA study tour for advanced composites in bridges in Europe and Japan
DOT National Transportation Integrated Search
1997-10-01
Under the Federal Highway Administration's (FHWA) International Technology Scanning Program, a team of 13 U.S. bridge engineers and advanced composite experts from Federal and State transportation agencies, academia, and industry conducted a 2-week s...
Developing Engineering and Science Process Skills Using Design Software in an Elementary Education
NASA Astrophysics Data System (ADS)
Fusco, Christopher
This paper examines the development of process skills through an engineering design approach to instruction in an elementary lesson that combines Science, Technology, Engineering, and Math (STEM). The study took place with 25 fifth graders in a public, suburban school district. Students worked in groups of five to design and construct model bridges based on research involving bridge building design software. The assessment was framed around individual student success as well as overall group processing skills. These skills were assessed through an engineering design packet rubric (student work), student surveys of learning gains, observation field notes, and pre- and post-assessment data. The results indicate that students can successfully utilize design software to inform constructions of model bridges, develop science process skills through problem based learning, and understand academic concepts through a design project. The final result of this study shows that design engineering is effective for developing cooperative learning skills. The study suggests that an engineering program offered as an elective or as part of the mandatory curriculum could be beneficial for developing students' critical thinking, inter- and intra-personal skills, along with an increased their understanding and awareness for scientific phenomena. In conclusion, combining a design approach to instruction with STEM can increase efficiency in these areas, generate meaningful learning, and influence student attitudes throughout their education.
Bridge condition assessment based on long-term strain monitoring
NASA Astrophysics Data System (ADS)
Sun, LiMin; Sun, Shouwang
2011-04-01
In consideration of the important role that bridges play as transportation infrastructures, their safety, durability and serviceability have always been deeply concerned. Structural Health Monitoring Systems (SHMS) have been installed to many long-span bridges to provide bridge engineers with the information needed in making rational decisions for maintenance. However, SHMS also confronted bridge engineers with the challenge of efficient use of monitoring data. Thus, methodologies which are robust to random disturbance and sensitive to damage become a subject on which many researches in structural condition assessment concentrate. In this study, an innovative probabilistic approach for condition assessment of bridge structures was proposed on the basis of long-term strain monitoring on steel girder of a cable-stayed bridge. First, the methodology of damage detection in the vicinity of monitoring point using strain-based indices was investigated. Then, the composition of strain response of bridge under operational loads was analyzed. Thirdly, the influence of temperature and wind on strains was eliminated and thus strain fluctuation under vehicle loads is obtained. Finally, damage evolution assessment was carried out based on the statistical characteristics of rain-flow cycles derived from the strain fluctuation under vehicle loads. The research conducted indicates that the methodology proposed is qualified for structural condition assessment so far as the following respects are concerned: (a) capability of revealing structural deterioration; (b) immunity to the influence of environmental variation; (c) adaptability to the random characteristic exhibited by long-term monitoring data. Further examination of the applicability of the proposed methodology in aging bridge may provide a more convincing validation.
Experimental and Analytical Seismic Studies of a Four-Span Bridge System with Innovative Materials
NASA Astrophysics Data System (ADS)
Cruz Noguez, Carlos Alonso
As part of a multi-university project utilizing the NSF Network for Earthquake Engineering Simulation (NEES), a quarter-scale model of a four-span bridge incorporating plastic hinges with different advanced materials was tested to failure on the three shake table system at the University of Nevada, Reno (UNR). The bridge was the second test model in a series of three 4-span bridges, with the first model being a conventional reinforced-concrete (RC) structure. The purpose of incorporating advanced materials was to improve the seismic performance of the bridge with respect to two damage indicators: (1) column damage and (2) permanent deformations. The goals of the study presented in this document were to (1) evaluate the seismic performance of a 4-span bridge system incorporating SMA/ECC and built-in rubber pad plastic hinges as well as post-tensioned piers, (2) quantify the relative merit of these advanced materials and details compared to each other and to conventional reinforced concrete plastic hinges, (3) determine the influence of abutment-superstructure interaction on the response, (4) examine the ability of available elaborate analytical modeling techniques to model the performance of advanced materials and details, and (5) conduct an extensive parametric study of different variations of the bridge model to study several important issues in bridge earthquake engineering. The bridge model included six columns, each pair of which utilized a different advanced detail at bottom plastic hinges: shape memory alloys (SMA), special engineered cementitious composites (ECC), elastomeric pads embedded into columns, and post-tensioning tendons. The design of the columns, location of the bents, and selection of the loading protocol were based on pre-test analyses conducted using computer program OpenSees. The bridge model was subjected to two-horizontal components of simulated earthquake records of the 1994 Northridge earthquake. Over 340 channels of data were collected. The test results showed the effectiveness of the advanced materials in reducing damage and permanent displacements. The damage was minimal in plastic hinges with SMA/ECC and those with built-in elastomeric pads. Conventional RC plastic hinges were severely damaged due to spalling of concrete and rupture of the longitudinal and transverse reinforcement. Extensive post-test analytical studies were conducted and it was determined that a computational model of the bridge that included bridge-abutment interaction using OpenSees was able to provide satisfactory estimations of key structural parameters such as superstructure displacements and base shears. The analytical model was also used to conduct parametric studies on single-column and bridge-system response under near-fault ground motions. The effects of vertical excitations and transverse shear-keys at the bridge abutments on the superstructure displacement and column drifts were also explored.
Effective Sealing and Monitoring of Small Movement Expansion Joints in Connecticut Bridges
DOT National Transportation Integrated Search
2017-03-01
One in nine bridges in the United States is rated as structurally deficient by the 2013 Infrastructure Report Card published by the American Society of Civil Engineers. One of the primary degradation factors that contribute to compromising the struct...
23 CFR 630.802 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Applicability. 630.802 Section 630.802 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS PRECONSTRUCTION PROCEDURES Bridges on Federal Dams § 630.802 Applicability. A proposed bridge over a dam, together with the...
23 CFR 630.802 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Applicability. 630.802 Section 630.802 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS PRECONSTRUCTION PROCEDURES Bridges on Federal Dams § 630.802 Applicability. A proposed bridge over a dam, together with the...
Autonomous measurements of bridge pier and abutment scour using motion-sensing radio transmitters.
DOT National Transportation Integrated Search
2010-01-01
Two portable Radio Frequency IDentification (RFID) systems (made by Texas Instruments and HiTAG) were developed and tested for bridge scour monitoring by the Department of Civil and Environmental Engineering at the University of Iowa. Both systems co...
Repairing/strengthening of bridges with post-tensioned FRP strands and performance evaluation.
DOT National Transportation Integrated Search
2008-06-01
The proposed project is to take advantage of some new developments in bridge engineering to apply fiber reinforced polymers (FRP) post-tensioning strands on a selected structure. The use of externally post-tensioned FRP strands to repair/strengthen b...
23 CFR 650.303 - Applicability.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Applicability. 650.303 Section 650.303 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... Inspection Standards (NBIS) in this subpart apply to all structures defined as highway bridges located on all...
23 CFR 650.303 - Applicability.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Applicability. 650.303 Section 650.303 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... Inspection Standards (NBIS) in this subpart apply to all structures defined as highway bridges located on all...
23 CFR 650.303 - Applicability.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Applicability. 650.303 Section 650.303 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... Inspection Standards (NBIS) in this subpart apply to all structures defined as highway bridges located on all...
23 CFR 650.303 - Applicability.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Applicability. 650.303 Section 650.303 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... Inspection Standards (NBIS) in this subpart apply to all structures defined as highway bridges located on all...
23 CFR 650.303 - Applicability.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Applicability. 650.303 Section 650.303 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION ENGINEERING AND TRAFFIC OPERATIONS BRIDGES... Inspection Standards (NBIS) in this subpart apply to all structures defined as highway bridges located on all...
Standards for single span prefabricated bridges : phase I - concept development.
DOT National Transportation Integrated Search
2014-07-01
In coordination with a Technical Advisory Committee (TAC) consisting of County : Engineers and Iowa DOT representatives, the Iowa DOT has proposed to develop a set : of standards for a single span prefabricated bridge system for use on the local road...
Astronauts Hoffman and Musgrave install the Magnetic Sensing System on HST
1993-12-07
STS061-77-102 (7 Dec 1993) --- Astronauts Jeffrey A. Hoffman (left) and F. Story Musgrave are partially silhouetted against the Indian Ocean as they work to install the Magnetic Sensing System (MSS) on the Hubble Space Telescope (HST). Musgrave is anchored to the end of the Space Shuttle Endeavour's Remote Manipulator System (RMS) arm. The HST is positioned along the southern end of Madagascar, 325 nautical miles away. Visible on the western coast are the sediment laden Onilahy and Fiherenana Rivers which empty into Saint Augustin Bay. North of Fiherenana River is the Mangoky River. The circular feature on the southern end of Madagascar and to the right of HST is the L'ivakoany Mountains. The eastern coast is relatively straight compared to the western coast.
Integrating modal-based NDE techniques and bridge management systems using quality management
NASA Astrophysics Data System (ADS)
Sikorsky, Charles S.
1997-05-01
The intent of bridge management systems is to help engineers and managers determine when and where to spend bridge funds such that commerce and the motoring public needs are satisfied. A major shortcoming which states are experiencing is the NBIS data available is insufficient to perform certain functions required by new bridge management systems, such as modeling bridge deterioration and predicting costs. This paper will investigate how modal based nondestructive damage evaluation techniques can be integrated into bridge management using quality management principles. First, quality from the manufacturing perspective will be summarized. Next, the implementation of quality management in design and construction will be reinterpreted for bridge management. Based on this, a theory of approach will be formulated to improve the productivity of a highway transportation system.
Ashley, Michael; Cooper, Katelyn M.; Cala, Jacqueline M.; Brownell, Sara E.
2017-01-01
Summer bridge programs are designed to help transition students into the college learning environment. Increasingly, bridge programs are being developed in science, technology, engineering, and mathematics (STEM) disciplines because of the rigorous content and lower student persistence in college STEM compared with other disciplines. However, to our knowledge, a comprehensive review of STEM summer bridge programs does not exist. To provide a resource for bridge program developers, we conducted a systematic review of the literature on STEM summer bridge programs. We identified 46 published reports on 30 unique STEM bridge programs that have been published over the past 25 years. In this review, we report the goals of each bridge program and whether the program was successful in meeting these goals. We identify 14 distinct bridge program goals that can be organized into three categories: academic success goals, psychosocial goals, and department-level goals. Building on the findings of published bridge reports, we present a set of recommendations for STEM bridge programs in hopes of developing better bridges into college. PMID:29146667
Arch-Axis Coefficient Optimization of Long-Span Deck-Type Concrete-Filled Steel Tubular Arch Bridge
NASA Astrophysics Data System (ADS)
Liu, Q. J.; Wan, S.; Liu, H. C.
2017-11-01
This paper is based on Nanpuxi super major bridge which is under construction and starts from Wencheng Zhejiang province to Taishun highway. A finite element model of the whole bridge is constructed using Midas Civil finite element software. The most adverse load combination in the specification is taken into consideration to determine the method of calculating the arch-axis coefficient of long-span deck-type concrete-filled steel tubular arch bridge. By doing this, this paper aims at providing references for similar engineering projects.
Joint Knowledge Generation Between Climate Science and Infrastructure Engineering
NASA Astrophysics Data System (ADS)
Stoner, A. M. K.; Hayhoe, K.; Jacobs, J. M.
2015-12-01
Over the past decade the engineering community has become increasingly aware of the need to incorporate climate projections into the planning and design of sensitive infrastructure. However, this is a task that is easier said than done. This presentation will discuss some of the successes and hurdles experiences through the past year, from a climate scientist's perspective, working with engineers in infrastructure research and applied engineering through the Infrastructure & Climate Network (ICNet). Engineers rely on strict building codes and ordinances, and can be the subject of lawsuits if those codes are not followed. Matters are further complicated by the uncertainty inherent to climate projections, which include short-term natural variability, as well as the influence of scientific uncertainty and even human behavior on the rate and magnitude of change. Climate scientists typically address uncertainty by creating projections based on multiple models following different future scenarios. This uncertainty is difficult to incorporate into engineering projects, however, due to the fact that they cannot build two different bridges, one allowing for a lower amount of change, and another for a higher. More often than not there is a considerable difference between the costs of building two such bridges, which means that available funds often are the deciding factor. Discussions of climate science are often well received with engineers who work in the research area of infrastructure; going a step further, however, and implementing it in applied engineering projects can be challenging. This presentation will discuss some of the challenges and opportunities inherent to collaborations between climate scientists and transportation engineers, drawing from a range of studies including truck weight restrictions on roads during the spring thaw, and bridge deck performance due to environmental forcings.
... Otolaryngology: Head & Neck Surgery . 6th ed. Philadelphia, PA: Elsevier Saunders; 2015:chap 106. Hoffman HT, Gailey MPO, ... Otolaryngology: Head & Neck Surgery . 6th ed. Philadelphia, PA: Elsevier Saunders; 2015:chap 107. Mark LJ, Hillel AT, ...
... GM. Disorders of iron homeostasis: iron deficiency and overload. In: Hoffman R, Benz EJ Jr, Silberstein LE, ... to achieve this important distinction for online health information and services. Learn more about A.D.A. ...
... GM. Disorders of iron homeostasis: iron deficiency and overload. In: Hoffman R, Benz EJ Jr, Silberstein LE, ... to achieve this important distinction for online health information and services. Learn more about A.D.A. ...
... GM. Disorders of iron homeostasis: iron deficiency and overload. In: Hoffman R, Benz EJ Jr, Silberstein LE, ... to achieve this important distinction for online health information and services. Learn more about A.D.A. ...
68. Photocopy of drawing (from print, Burlington Northern Engineering Office) ...
68. Photocopy of drawing (from print, Burlington Northern Engineering Office) STRESS DIAGRAM - Burlington Northern Railroad Bridge, Spanning Willamette River at River Mile 6.9, Portland, Multnomah County, OR
DOT National Transportation Integrated Search
2012-11-01
When a bridge engineer encounters a design or analysis problem concerning a bridge substructure, that structure will commonly have a mixture of member types, some slender, and some squat. Slender members are generally governed by flexure, and normal ...
Development of a TL-3 deep beam tubular backup bridge rail : executive summary report.
DOT National Transportation Integrated Search
2010-12-01
Ohio Department of Transportation (ODOT)s Office of Structural Engineering has a need to evaluate and, if necessary, improve an existing bridge rail design with a simple retrofitting procedure to meet current or proposed crash testing standards. T...
An expert system as applied to bridges : software development phase.
DOT National Transportation Integrated Search
1989-01-01
This report describes the results of the third of a four-part study dealing with the use of a computerized expert system to assist bridge engineers in their structures management program. In this phase of the study, software (called DOBES) was writte...
DOT National Transportation Integrated Search
2012-02-01
The permanent deformations in steel beam bridges caused by collision with high profile vehicles can be repaired by heat straightening, : which is a structurally efficient and costeffective repair process developed by many engineers over the years....
Guidelines for analyzing the capacity of d-regions with premature concrete deterioration of ASR/DEF.
DOT National Transportation Integrated Search
2015-03-01
When a bridge engineer encounters a design or analysis problem concerning a bridge substructure, : that structure will commonly have a mixture of member types, some slender, and some squat. : Slender members are generally governed by flexure, and nor...
Bawden, Gerald W.; Bond, Sandra; Podoski, J. H.; Kreylos, O.; Kellogg, L. H.
2012-01-01
We used ground-based Tripod LiDAR (T-LiDAR) to assess the stability of two engineered structures: a bridge spanning the San Andreas fault following the M6.0 Parkfield earthquake in Central California and a newly built coastal breakwater located at the Kaumālapa`u Harbor Lana'i, Hawaii. In the 10 weeks following the earthquake, we found that the surface under the bridge shifted 7.1 cm with an additional 2.6 cm of motion in the subsequent 13 weeks, which deflected the bridge's northern I-beam support 4.3 cm and 2.1 respectively; the bridge integrity remained intact. T-LiDAR imagery was collected after the completion of armored breakwater with 817 35-ton interlocking concrete armor units, Core-Locs®, in the summers of 2007, 2008 and 2010. We found a wide range of motion of individual Core-Locs, from a few centimeters to >110 cm along the ocean side of the breakwater, with lesser movement along the harbor side.
Hittle, Elizabeth
2011-01-01
In small watersheds, runoff entering local waterways from large storms can cause rapid and profound changes in the streambed that can contribute to flooding. Wymans Run, a small stream in Cochranton Borough, Crawford County, experienced a large rain event in June 2008 that caused sediment to be deposited at a bridge. A hydrodynamic model, Flow and Sediment Transport and Morphological Evolution of Channels (FaSTMECH), which is incorporated into the U.S. Geological Survey Multi-Dimensional Surface-Water Modeling System (MD_SWMS) was constructed to predict boundary shear stress and velocity in Wymans Run using data from the June 2008 event. Shear stress and velocity values can be used to indicate areas of a stream where sediment, transported downstream, can be deposited on the streambed. Because of the short duration of the June 2008 rain event, streamflow was not directly measured but was estimated using U.S. Army Corps of Engineers one-dimensional Hydrologic Engineering Centers River Analysis System (HEC-RAS). Scenarios to examine possible engineering solutions to decrease the amount of sediment at the bridge, including bridge expansion, channel expansion, and dredging upstream from the bridge, were simulated using the FaSTMECH model. Each scenario was evaluated for potential effects on water-surface elevation, boundary shear stress, and velocity.
64. Photocopy of drawing (from print, Burlington Northern Engineering Office, ...
64. Photocopy of drawing (from print, Burlington Northern Engineering Office, Seattle) STRESS SHEET - Burlington Northern Railroad Bridge, Spanning Willamette River at River Mile 6.9, Portland, Multnomah County, OR
Applications of ground penetrating radar (GPR) in bridge deck monitoring and assessment
NASA Astrophysics Data System (ADS)
Alani, Amir M.; Aboutalebi, Morteza; Kilic, Gokhan
2013-10-01
This paper presents the essence of two case studies by the authors on two major bridges in the UK. The first case study reports on the applications of GPR and associated work carried out on the Forth Road Bridge near Edinburgh, Scotland, with the main objective of identifying possible structural defects including damaged rebar and moisture ingress at specific locations of the bridge deck. The second case study focuses on a full assessment of the Pentagon Road Bridge, in Chatham, Kent, England with particular emphasis on the identification of possible defects including structural cracks within the deck structure and establishing the layout of the upper and lower rebar positions throughout the bridge. These studies present interesting results in terms of locations of rebar and an accurate estimate of concrete cover condition as well as reporting on a remarkable similarity in the processed data concerning areas affected by ingress of moisture within the deck structures of the two bridges under investigation. It is believed that this paper will be of particular interest to bridge engineers and structural engineering practitioners with enthusiasm for adopting non-destructive testing methods such as GPR in the health monitoring and assessment of bridge structures. The observed similarities in the processed data between the two reported case studies present an interesting concept within the general context of the interpretation of GPR data, with the potential for use in many other forthcoming cases. The paper also reports on the adopted method for the GPR survey with emphasis on difficulties and challenges encountered during the actual survey. The presented results benefit from advanced processing and presentation techniques.
Custodians of the Coast: History of the United States Army Engineers at Galveston
1977-01-01
along with western roads and other projects such as beacon lights, monuments, bridges , and aqueducts. Surveying for river and harbor improvements 11...involved in tunnel- ing, bridging , and spanning gullies. Lt. Amiel W. Whipple, exploring the thirty-fifth parallel, retraced the junior Abert’s route...preoccupation with transportation. In Texas, roads were poor; streams were not bridged and, in many cases, not navigable. Onerous freight expenses cut
NASA Astrophysics Data System (ADS)
Riveiro, B.; DeJong, M.; Conde, B.
2016-06-01
Despite the tremendous advantages of the laser scanning technology for the geometric characterization of built constructions, there are important limitations preventing more widespread implementation in the structural engineering domain. Even though the technology provides extensive and accurate information to perform structural assessment and health monitoring, many people are resistant to the technology due to the processing times involved. Thus, new methods that can automatically process LiDAR data and subsequently provide an automatic and organized interpretation are required. This paper presents a new method for fully automated point cloud segmentation of masonry arch bridges. The method efficiently creates segmented, spatially related and organized point clouds, which each contain the relevant geometric data for a particular component (pier, arch, spandrel wall, etc.) of the structure. The segmentation procedure comprises a heuristic approach for the separation of different vertical walls, and later image processing tools adapted to voxel structures allows the efficient segmentation of the main structural elements of the bridge. The proposed methodology provides the essential processed data required for structural assessment of masonry arch bridges based on geometric anomalies. The method is validated using a representative sample of masonry arch bridges in Spain.
37. Photographic copy of the original construction drawing, 1934, by ...
37. Photographic copy of the original construction drawing, 1934, by Sverdrup and Parcel, Consulting Engineers, from microfilm copy at Bridge Division, Missouri Highway and Transportation Department. Stress sheet, continuous span - Mark Twain Memorial Bridge, Spanning Mississippi River at US Route 36, Hannibal, Marion County, MO
DOT National Transportation Integrated Search
2017-02-01
This report provides guidance to public officials and engineers considering the replacement of a deficient or obsolete bridge with a low-water stream crossing (LWSC). An LWSC is a structure that is occasionally overtopped by floodwaters and is likely...
DOT National Transportation Integrated Search
2011-08-01
With aging and deterioration of bridges, evaluation of existing conditions of their structural elements becomes vital to : engineers and public officials when deciding how to repair or replace the structures. The ability to obtain necessary : informa...
DOT National Transportation Integrated Search
2013-08-01
This project demonstrated the capabilities for load testing bridges in Iowa, developed and presented a webinar to local and state engineers, and produced a spreadsheet and benefit evaluation matrix that others can use to preliminarily assess where br...
Pier scour equations used in the People's Republic of China : review and summary
DOT National Transportation Integrated Search
1993-09-01
Equations for estimating scour depth at bridge structures was developed from model and field data presented at the Symposium on Scour at Bridges in China, 1964. These equations have been used in highway and railway engineering in China for more than ...
Engaging Faculty for Innovative STEM Bridge Programs
ERIC Educational Resources Information Center
Goldfien, Andrea C.; Badway, Norena Norton
2014-01-01
Bridge programs, in which underprepared students gain the academic and technical skills necessary for college level courses and entry-level employment, are a promising initiative for expanding access to, and success in, community college education. For career pathways related to science, technology, engineering, or mathematics (STEM), bridge…
1. Photocopied December, 1977, from loose original engineering drawing, Jervis ...
1. Photocopied December, 1977, from loose original engineering drawing, Jervis Library. SECTIONS OF INDIAN BROOK CLUVERT - Old Croton Aqueduct, Indian Creek Culvert, Reservoir & Quaker Bridge Roads, Crotonville, Ossining, Westchester County, NY
4. Photocopied December 1977, from loose original engineering drawing, Jervis ...
4. Photocopied December 1977, from loose original engineering drawing, Jervis Library. CENTERING FOR 88-FOOT ARCH. - Old Croton Aqueduct, Sing Sing Kill Bridge, Spanning Aqueduct Street & Broadway, Ossining, Westchester County, NY
14. June 1974. VIEW OF THE ENGINE ROOM, LOOKING NORTH, ...
14. June 1974. VIEW OF THE ENGINE ROOM, LOOKING NORTH, SHOWING THE OTTO GASOLINE ENGINE, THE DRIVE PULLEY IS BARELY VISIBLE TO THE LEFT OF THE FLYWHEEL. - Gruber Wagon Works, Pennsylvania Route 183 & State Hill Road at Red Bridge Park, Bernville, Berks County, PA
6. Historic American Buildings Survey, Ned Goode, Photographer September, 1959 ...
6. Historic American Buildings Survey, Ned Goode, Photographer September, 1959 WINDOW WITH EARLY VENETIAN BLINDS FIRST FLOOR EAST ROOM. - Hamilton-Hoffman House, Coggs Creek Parkway, Philadelphia, Philadelphia County, PA
Learning from the Parallel Pathways of Makers to Broaden Pathways to Engineering
ERIC Educational Resources Information Center
Foster, Christina; Wigner, Aubrey; Lande, Micah; Jordan, Shawn S.
2018-01-01
Background: Makers are a growing community of STEM-minded people who bridge technical and non-technical backgrounds to imagine, build and fabricate engineering systems. Some have engineering training, some do not. This paper presents a study to explore the educational pathways of adult Makers and how they intersect with engineering. This research…
ERIC Educational Resources Information Center
Wang, Yanqing; Qi, Zhongying; Li, Ziru; Zhang, Lijie
2011-01-01
Engineering education has been well implemented in the majority of developed countries such as the USA, Germany, and the United Kingdom so that the gap between engineering science and engineering practice is greatly bridged. However, in China, the gap still exists, and some attempts by Chinese government, even though having made obvious progress,…
NASA Astrophysics Data System (ADS)
Gao, Liang; Zhang, Shan; Zhang, Junfa; Wu, Xiangnan
2017-06-01
Rockfall impact on bridge piers threats severely the mountain bridge structures of lifeline engineering. Intended for mountain bridge pier protection against rockfall impact, the paper conducted comprehensive reviews on the research status of impact effects, anti-collision structure, impact response to rockfall, and protective design at home and abroad, and proposed a new-type protective structure against rockfall impact. In addition, the paper carried out deep studies on such key scientific issues as impact effect calculation, protective materials against rockfall impact, damage mechanism of protective units, and parameter optimization on the system of protective structures against rockfall impact as well, aiming to strength disaster prevention of mountain bridge structures.
Easy Bruising: Common as You Age
... out to cause a bigger bruise. Topical and systemic corticosteroids — which can be used to treat various ... Jan. 4, 2017. Hoffman R, et al. Clinical approach to the patient with bleeding or bruising. In: ...
Genetics Home Reference: Alström syndrome
... Hoffman JD, Jacobson Z, Young TL, Marshall JD, Kaplan P. Familial variable expression of dilated cardiomyopathy in ... Updated Pages Reviewed : September 2014 Published : June 19, 2018 The resources on this site should not be ...
Anticipating Climate Change Impacts on Army Installations
2011-10-01
13 3.2 Recent technologically derived ecological characterizations ....................................... 14 3.2.1 USGS Gap Analysis Program... GAP ) ......................................................................................... 14 3.2.2 Hargrove/Hoffman potential multivariate... GAP national land cover map .................................................................................................. 14 5 A Hargrove
DOT National Transportation Integrated Search
2017-02-01
This report provides guidance to public officials and engineers considering the replacement of a deficient or obsolete bridge with a low-water stream crossing (LWSC). An LWSC is a structure that is occasionally overtopped by floodwaters and is likely...
View forward from secondary bridge; note stack for venting after ...
View forward from secondary bridge; note stack for venting after boilers, ventilators, davits, searchlights on port and starboard stanchions and ship's pulling boats; skylight at lower center provides light to engine room. (p30) - USS Olympia, Penn's Landing, 211 South Columbus Boulevard, Philadelphia, Philadelphia County, PA
PBF (PER620) south facade. Camera facing north. Note pedestrian bridge ...
PBF (PER-620) south facade. Camera facing north. Note pedestrian bridge crossing over conduit. Central high bay contains reactor room and canal. Date: March 2004. INEEL negative no. HD-41-2-1 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
59. Photographic copy of the original construction drawing, 1934, by ...
59. Photographic copy of the original construction drawing, 1934, by Sverdrup and Parcel, Consulting Engineers, from microfilm copy at Bridge Division, Missouri Highway and Transportation Department. Construction changes in pier 7 - Mark Twain Memorial Bridge, Spanning Mississippi River at US Route 36, Hannibal, Marion County, MO
41. Photographic copy of the original construction drawing, 192627, by ...
41. Photographic copy of the original construction drawing, 1926-27, by Harrington, Howard, and Ash, Consulting Engineers, from microfilm copy at Bridge Division, Missouri Highway and Transportation Department, Jefferson City, Missouri. STRESS SHEET - Cape Girardeau Bridge, Spanning Mississippi River at State Highway 146, Cape Girardeau, Cape Girardeau County, MO
45. Photographic copy of the original construction drawing, 1934, by ...
45. Photographic copy of the original construction drawing, 1934, by Sverdrup and Parcel, Consulting Engineers, from microfilm copy at Bridge Division, Missouri Highway and Transportation Department. Cross section--300-ft. span - Mark Twain Memorial Bridge, Spanning Mississippi River at US Route 36, Hannibal, Marion County, MO
44. Photographic copy of the original construction drawing, 1934, by ...
44. Photographic copy of the original construction drawing, 1934, by Sverdrup and Parcel, Consulting Engineers, from microfilm copy at Bridge Division, Missouri Highway and Transportation Department. Details of 300-ft. span - Mark Twain Memorial Bridge, Spanning Mississippi River at US Route 36, Hannibal, Marion County, MO
DOT National Transportation Integrated Search
2009-04-01
Scour, an engineering term for erosion, is : the result of the erosive action of flowing : water excavating and carrying away : material from the bed and banks of : streams and from around the piers and : abutments of bridges. For analysis : purposes...
The Efficacy of Surface Haptics and Force Feedback in Education
ERIC Educational Resources Information Center
Gorlewicz, Jenna Lynn
2013-01-01
This dissertation bridges the fields of haptics, engineering, and education to realize some of the potential benefits haptic devices may have in Science, Technology, Engineering, and Math (STEM) education. Specifically, this dissertation demonstrates the development, implementation, and assessment of two haptic devices in engineering and math…
Trial guidelines for the conservation of Virginia's historic bridges.
DOT National Transportation Integrated Search
1986-01-01
Interest in the preservation of historic engineering structures has increased dramatically over the past decade. Because civil engineering structures primarily serve functions in the public domain, their preservation focuses attention on what appear ...
9. Photocopy of photograph original print located in collection of ...
9. Photocopy of photograph original print located in collection of William H. Caruthers, Jr., Richmond, Virginia, and loaned by Susan A. Harter, Tempe, Arizona. Photographer assumed to be William H. Caruthers, Sr., assistant (construction) engineer for the Ash Avenue Bridge, 1912 VIEW OF ASH AVENUE BRIDGE UNDER CONSTRUCTION, LOOKING NORTH, SHOWING STEEL REINFORCEMENT IN DECK BEFORE PLACEMENT OF CONCRETE - Ash Avenue Bridge, Spanning Salt River at Foot of Ash Avenue, Tempe, Maricopa County, AZ
1953-06-01
TA7 ,vJ31 (\\0’ 2..- .:;~b £c CORPS OF ENGINEERS, U. S. ARMY PLANS FOR IMPROVEMENT OF NAVIGATION CONDITIONS AT GREENVILLE BRIDGE, MISSISSIPPI...REPORT TYPE 3. DATES COVERED 00-00-1953 to 00-00-1953 4. TITLE AND SUBTITLE Plans for Improvement of Navigation Conditions at Greenville...of plans to improve navigation conditions on the Mississippi River in the vicinity of the Greenville Bridge at Greenville, Mississ:l.ppi, was
2014-05-27
Girl Scout troop 2612 members from Tulsa, OK take photos of one another with Google Glass at the White House Science Fair Tuesday, May 27, 2014. Avery Dodson, 6; Natalie Hurley, 8; Miriam Schaffer, 8; Claire Winton, 8; and Lucy Claire Sharp, 8 participated in the Junior FIRST Lego League's Disaster Blaster Challenge, which invites elementary-school-aged students from across the country to explore how simple machines, engineering, and math can help solve problems posed by natural disasters. The girls invented the "Flood Proof Bridge" and built a model mechanizing the bridge using motors and developing a computer program to automatically retract the bridge when flood conditions are detected. The fourth White House Science Fair was held at the White House and included 100 students from more than 30 different states who competed in science, technology, engineering, and math (STEM) competitions. (Photo Credit: NASA/Aubrey Gemignani)
Implementation of civionics in a second generation steel-free bridge deck
NASA Astrophysics Data System (ADS)
Klowak, Chad; Rivera, Evangeline; Mufti, Aftab
2005-05-01
As the design and construction of civil structures continue to evolve, it is becoming imperative that these structures be monitored for their health. In order to meet this need, the discipline of Civionics has emerged. Civionics is a new term coined from Civil-Electronics, which is derived from the application of electronics to civil structures. It is similar to the term Avionics, which is used in the aerospace industry. If structural health monitoring is to become part of civil structural engineering, it should include Civionics. It involves the application of electronics to civil structures and aims to assist engineers in realizing the full benefits of structural health monitoring (SHM). In past SHM field applications, the main reason for the failure of a sensor was not the installation of the sensor itself but the egress of the sensor cables. Often, the cables were not handled and protected correctly. For SHM to be successful, specifications must be written on the entire process, beginning with system design and concluding with data collection, interpretation, and management. Civionics specifications include the technical requirements for a SHM system which encompasses fibre optic sensors, cables, conduits, junction boxes and the control room. A specification for data collection and storage is currently being developed as well. In the spring of 2004 research engineers at the University of Manitoba constructed a full-scale second generation steel free bridge deck. The bridge deck is the first of its kind to fully incorporate a complete civionics structural health monitoring system to monitor the deck's behaviour during destructive testing. Throughout the construction of the bridge deck, the entire installation of the civionics system was carried out by research engineers simulating an actual implementation of such a system in a large scale construction environment. One major concern that consulting engineers have raised is the impact that a civionics system that uses conduit, junction boxes, and other electrical ancillary protection, will have when embedded and installed externally on full-scale infrastructure. The full-scale destructive testing of a second generation steel-free bridge deck using a civionics system designed and implemented following guidelines in a civioncs specification manual at the University of Manitoba will provide engineers with the information necessary to address the constructability and structural integrity issues. Civioncs combined with structural health monitoring will provide engineers with feedback necessary to aid in optimizing design techniques and understanding our infrastructures performance, behaviour and state of condition.
Superhydrophobic engineered cementitious composites for highway applications : phase I.
DOT National Transportation Integrated Search
2013-05-01
The strength and durability of highway bridges are two of the key components in maintaining a high level of freight transportation capacity on the nations highways. This research focused on developing new hybrid superhydrophobic engineered cementi...
15. View looking N at foundation ruins of steam engine ...
15. View looking N at foundation ruins of steam engine and cane mill. - Hacienda Azucarera La Esperanza, Mill (Ruins), 2.65 miles North of PR Route 2 Bridge Over Manati River, Manati, Manati Municipio, PR
16. View looking E at foundation ruins of steam engine ...
16. View looking E at foundation ruins of steam engine and cane mill. - Hacienda Azucarera La Esperanza, Mill (Ruins), 2.65 miles North of PR Route 2 Bridge Over Manati River, Manati, Manati Municipio, PR
Criteria for preservation and adaptive use of historic highway structures.
DOT National Transportation Integrated Search
1978-01-01
Metal truss bridges are uniquely indigenous products of American engineering and construction technology, and in recent years their historic significance has been increasingly recognized along with that of other early engineering structures. Some tru...
18. Photocopy of an engineering drawing (original in the Collection ...
18. Photocopy of an engineering drawing (original in the Collection of the Washington State Department of Public Works)--August 1921--LOCATION-TOPOGRAPHY AND GENERAL ELEVATION - Pasco-Kennewick Bridge, Spanning Columbia River, Pasco, Franklin County, WA
Helping System Engineers Bridge the Peaks
NASA Technical Reports Server (NTRS)
Rungta, Neha; Tkachuk, Oksana; Person, Suzette; Biatek, Jason; Whalen, Michael W.; Castle, Joseph; Castle, JosephGundy-Burlet, Karen
2014-01-01
In our experience at NASA, system engineers generally follow the Twin Peaks approach when developing safety-critical systems. However, iterations between the peaks require considerable manual, and in some cases duplicate, effort. A significant part of the manual effort stems from the fact that requirements are written in English natural language rather than a formal notation. In this work, we propose an approach that enables system engineers to leverage formal requirements and automated test generation to streamline iterations, effectively "bridging the peaks". The key to the approach is a formal language notation that a) system engineers are comfortable with, b) is supported by a family of automated V&V tools, and c) is semantically rich enough to describe the requirements of interest. We believe the combination of formalizing requirements and providing tool support to automate the iterations will lead to a more efficient Twin Peaks implementation at NASA.
Chen, Zhiwei; Chen, Bo
2014-01-01
Many long-span bridges have been built throughout the world in recent years but they are often subject to multiple types of dynamic loads, especially those located in wind-prone regions and carrying both trains and road vehicles. To ensure the safety and functionality of these bridges, dynamic responses of long-span bridges are often required for bridge assessment. Given that there are several limitations for the assessment based on field measurement of dynamic responses, a promising approach is based on numerical simulation technologies. This paper provides a detailed review of key issues involved in dynamic response analysis of long-span multiload bridges based on numerical simulation technologies, including dynamic interactions between running trains and bridge, between running road vehicles and bridge, and between wind and bridge, and in the wind-vehicle-bridge coupled system. Then a comprehensive review is conducted for engineering applications of newly developed numerical simulation technologies to safety assessment of long-span bridges, such as assessment of fatigue damage and assessment under extreme events. Finally, the existing problems and promising research efforts for the numerical simulation technologies and their applications to assessment of long-span multiload bridges are explored.
Chen, Zhiwei; Chen, Bo
2014-01-01
Many long-span bridges have been built throughout the world in recent years but they are often subject to multiple types of dynamic loads, especially those located in wind-prone regions and carrying both trains and road vehicles. To ensure the safety and functionality of these bridges, dynamic responses of long-span bridges are often required for bridge assessment. Given that there are several limitations for the assessment based on field measurement of dynamic responses, a promising approach is based on numerical simulation technologies. This paper provides a detailed review of key issues involved in dynamic response analysis of long-span multiload bridges based on numerical simulation technologies, including dynamic interactions between running trains and bridge, between running road vehicles and bridge, and between wind and bridge, and in the wind-vehicle-bridge coupled system. Then a comprehensive review is conducted for engineering applications of newly developed numerical simulation technologies to safety assessment of long-span bridges, such as assessment of fatigue damage and assessment under extreme events. Finally, the existing problems and promising research efforts for the numerical simulation technologies and their applications to assessment of long-span multiload bridges are explored. PMID:25006597
Kalkan, E.; Kwong, N.
2012-01-01
The earthquake engineering profession is increasingly utilizing nonlinear response history analyses (RHA) to evaluate seismic performance of existing structures and proposed designs of new structures. One of the main ingredients of nonlinear RHA is a set of ground motion records representing the expected hazard environment for the structure. When recorded motions do not exist (as is the case in the central United States) or when high-intensity records are needed (as is the case in San Francisco and Los Angeles), ground motions from other tectonically similar regions need to be selected and scaled. The modal-pushover-based scaling (MPS) procedure was recently developed to determine scale factors for a small number of records such that the scaled records provide accurate and efficient estimates of “true” median structural responses. The adjective “accurate” refers to the discrepancy between the benchmark responses and those computed from the MPS procedure. The adjective “efficient” refers to the record-to-record variability of responses. In this paper, the accuracy and efficiency of the MPS procedure are evaluated by applying it to four types of existing Ordinary Standard bridges typical of reinforced concrete bridge construction in California. These bridges are the single-bent overpass, multi-span bridge, curved bridge, and skew bridge. As compared with benchmark analyses of unscaled records using a larger catalog of ground motions, it is demonstrated that the MPS procedure provided an accurate estimate of the engineering demand parameters (EDPs) accompanied by significantly reduced record-to-record variability of the EDPs. Thus, it is a useful tool for scaling ground motions as input to nonlinear RHAs of Ordinary Standard bridges.
Kalkan, Erol; Kwong, Neal S.
2010-01-01
The earthquake engineering profession is increasingly utilizing nonlinear response history analyses (RHA) to evaluate seismic performance of existing structures and proposed designs of new structures. One of the main ingredients of nonlinear RHA is a set of ground-motion records representing the expected hazard environment for the structure. When recorded motions do not exist (as is the case for the central United States), or when high-intensity records are needed (as is the case for San Francisco and Los Angeles), ground motions from other tectonically similar regions need to be selected and scaled. The modal-pushover-based scaling (MPS) procedure recently was developed to determine scale factors for a small number of records, such that the scaled records provide accurate and efficient estimates of 'true' median structural responses. The adjective 'accurate' refers to the discrepancy between the benchmark responses and those computed from the MPS procedure. The adjective 'efficient' refers to the record-to-record variability of responses. Herein, the accuracy and efficiency of the MPS procedure are evaluated by applying it to four types of existing 'ordinary standard' bridges typical of reinforced-concrete bridge construction in California. These bridges are the single-bent overpass, multi span bridge, curved-bridge, and skew-bridge. As compared to benchmark analyses of unscaled records using a larger catalog of ground motions, it is demonstrated that the MPS procedure provided an accurate estimate of the engineering demand parameters (EDPs) accompanied by significantly reduced record-to-record variability of the responses. Thus, the MPS procedure is a useful tool for scaling ground motions as input to nonlinear RHAs of 'ordinary standard' bridges.
20. Photographic copy of the original construction drawing, 193031, by ...
20. Photographic copy of the original construction drawing, 1930-31, by Sverdrup and Parcel, Consulting Engineers, from microfilm copy at Bridge Division, Missouri Highway and Transportation Department, Jefferson City, Missouri. Truss stress diagram, and plans of laterals and sway braces - Gasconade Bridge, Spanning Gasconade River at State Route 100, Gasconade, Gasconade County, MO
9. DETAIL VIEW OF BRIDGE CRANE ON WEST SIDE OF ...
9. DETAIL VIEW OF BRIDGE CRANE ON WEST SIDE OF BUILDING. CAMERA FACING NORTHEAST. CONTAMINATED AIR FILTERS LOADED IN TRANSPORT CASKS WERE TRANSFERRED TO VEHICLES AND SENT TO RADIOACTIVE WASTE MANAGEMENT COMPLEX FOR STORAGE. INEEL PROOF NUMBER HD-17-1. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID
15. Wayne Chandler, Photographer, August 1993 Photographic copy of Xerox ...
15. Wayne Chandler, Photographer, August 1993 Photographic copy of Xerox copy of original plans, dated 1932, by Wisconsin Highway Commission. Xerox copy in possession of Westbrook Associated Engineers, Spring Green, Wisconsin. GENERAL PLAN AND ELEVATION OF BRIDGE. - Chippewa River Bridge, Spanning Chippewa River at State Highway 35, Nelson, Buffalo County, WI
11. Photographic copy of lines drawing of original construction (24 ...
11. Photographic copy of lines drawing of original construction (24 January 1911, in possession of St. Louis County Bridge Engineer, Virginia, Minnesota). Profile of main and approach spans; plan and sectional view of concrete river pier - Brosseau Road Bridge, County Road 694 spanning Cloquet at River, Burnett, St. Louis County, MN
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-28
... construction time and traffic congestion; C. The development of engineering design criteria for innovative products, materials, and structural systems for use in highway bridges and structures; D. The reduction of... construction, repair, and rehabilitation of bridges and other highway structures. This program was funded by...
NREL Bridges Fuels and Engines R&D to Maximize Vehicle Efficiency and
innovation-from fuel chemistry, conversion, and combustion to the evaluation of advanced fuels in actual -cylinder engine for advanced compression ignition fuels research will be installed and commissioned in the vehicle performance and emissions research, two engine dynamometer test cells for advanced fuels research
Engineer: The Professional Bulletin of Army Engineers. Volume 41, May-August 2011
2011-08-01
agement Authority ( NDMA ), more than 20 million Paki- stanis have been affected by this catastrophic event—the country’s worst monsoon season in 80 years... NDMA for the Pakistan mil- itary engineers to install, and an official bridge turnover ceremony was held at the U.S. embassy in Islamabad on 1
10. Photocopy of photograph original print located in collection of ...
10. Photocopy of photograph original print located in collection of William H. Caruthers, Jr., Richmond, Virginia, and loaned by Susan A. Hatter, Tempe, Arizona. Photographer assumed to be William H. Caruthers, Sr., assistant (construction) engineer for the Ash Avenue Bridge, 1912 VIEW, LOOKING NORTH, SHOWING ASH AVENUE BRIDGE UNDER CONSTRUCTION. WORK IS PROGRESSING FROM THE SOUTH BANK TO THE NORTH BANK OF THE SALT RIVER - Ash Avenue Bridge, Spanning Salt River at Foot of Ash Avenue, Tempe, Maricopa County, AZ
Bridging the Engineering and Medicine Gap
NASA Technical Reports Server (NTRS)
Walton, M.; Antonsen, E.
2018-01-01
A primary challenge NASA faces is communication between the disparate entities of engineers and human system experts in life sciences. Clear communication is critical for exploration mission success from the perspective of both risk analysis and data handling. The engineering community uses probabilistic risk assessment (PRA) models to inform their own risk analysis and has extensive experience managing mission data, but does not always fully consider human systems integration (HSI). The medical community, as a part of HSI, has been working 1) to develop a suite of tools to express medical risk in quantitative terms that are relatable to the engineering approaches commonly in use, and 2) to manage and integrate HSI data with engineering data. This talk will review the development of the Integrated Medical Model as an early attempt to bridge the communication gap between the medical and engineering communities in the language of PRA. This will also address data communication between the two entities in the context of data management considerations of the Medical Data Architecture. Lessons learned from these processes will help identify important elements to consider in future communication and integration of these two groups.
A model study of bridge hydraulics : technical summary.
DOT National Transportation Integrated Search
2010-08-01
Most flood studies in the United States use the Army Corps of Engineers Hydrologic Engineering Centers River Analysis System (HEC-RAS) computer program. This report is the second edition. The first edition of the report considered the laboratory m...
Best Manufacturing Practices Survey Conducted at Litton Data Systems Division, Van Nuys, California
1988-10-01
Hardware and Software ................................ 10 DESIGN RELEASE Engineering Change Order Processing and Analysis...structured using bridges to isolate local traffic. Long term plans call for a wide-band network. ENGINEERING CHANGE ORDER PROCESSING AND ANALYSIS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gaonkar, Amita, E-mail: ami.gaonkar@gmail.com; Murudkar, Vrishali, E-mail: vru0077@gmail.com; Deshpande, V. D., E-mail: vindesh2@rediffmail.com
2016-05-06
Polyethylene terephthalate (PET) and Nucleated PET/ multi-walled carbon nanotubes (MWCNTs) nanocomposites with different MWCNTs loadings were prepared by melt compounding. The influence of the addition of MWCNTs and precipitated PET (p-PET) on the morphology and thermal properties of the nanocomposites was investigated. From Transmission Electronic Microscopy (TEM) and Wide angle X-Ray diffraction (WAXD) study, it can be clearly seen that nanocomposites with low MWCNTs contents (0.1 wt. %) get better MWCNTs dispersion than higher MWCNT loading. Comparing with PET, nucleated PET nanocomposite with 0.1% MWCNT loading shows higher value of Lauritzen-Hoffman parameters U* and Kg evaluated using the differential isoconversionalmore » method. Crystallization regime transition temperature range shifts to higher temperature (208°C - 215°C) for nanocomposites. The presence of p-PET in addition of MWCNT, which act as good nucleating agent, enhanced the crystallization of PET through heterogeneous nucleation.« less
NASA Astrophysics Data System (ADS)
Gaonkar, Amita; Murudkar, Vrishali; Deshpande, V. D.
2016-05-01
Polyethylene terephthalate (PET) and Nucleated PET/ multi-walled carbon nanotubes (MWCNTs) nanocomposites with different MWCNTs loadings were prepared by melt compounding. The influence of the addition of MWCNTs and precipitated PET (p-PET) on the morphology and thermal properties of the nanocomposites was investigated. From Transmission Electronic Microscopy (TEM) and Wide angle X-Ray diffraction (WAXD) study, it can be clearly seen that nanocomposites with low MWCNTs contents (0.1 wt. %) get better MWCNTs dispersion than higher MWCNT loading. Comparing with PET, nucleated PET nanocomposite with 0.1% MWCNT loading shows higher value of Lauritzen-Hoffman parameters U* and Kg evaluated using the differential isoconversional method. Crystallization regime transition temperature range shifts to higher temperature (208°C - 215°C) for nanocomposites. The presence of p-PET in addition of MWCNT, which act as good nucleating agent, enhanced the crystallization of PET through heterogeneous nucleation.
Large-scale galactic motions: test of the Dipole Repeller model with the RFGC galaxies data
NASA Astrophysics Data System (ADS)
Parnovsky, S.
2017-06-01
The paper "The Dipole Repeller" in Nature Astronomy by Hoffman et al. state that the local large-scale galactic flow is dominated by a single attractor - associated with the Shapley Concentration - and a single previously unidentified repeller. We check this hypothesis using the data for 1459 galaxies from RFGC catalogue with distances up to 100 h-1 Mpc. We compared the models with multipole velocity field for pure Hubble expansion and dipole, quadrupole and octopole motion with the models with two attractors in the regions indicated by Hoffman et al with the multipole velocity field background. The results do not support the hypothesis, but does not contradict it. In any case, the inclusion of the following multipole is more effective than the addition of two attractors. Estimations of excess mass of attractors vary greatly, even changing their sign depending on the highest multipole used in model.
A "Sweet 16" of Rules About Teamwork
NASA Technical Reports Server (NTRS)
Laufer, Alexander (Editor)
2002-01-01
The following "Sweet 16" rules included in this paper derive from a longer paper by APPL Director Dr. Edward Hoffman and myself entitled " 99 Rules for Managing Faster, Better, Cheaper Projects." Our sources consisted mainly of "war stories" told by master project managers in my book Simultaneous Management: Managing Projects in a Dynamic Environment (AMACOM, The American Management Association, 1996). The Simultaneous Management model was a result of 10 years of intensive research and testing conducted with the active participation of master project managers from leading private organizations such as AT&T, DuPont, Exxon, General Motors, IBM, Motorola and Procter & Gamble. In a more recent study, led by Dr. Hoffman, we learned that master project managers in leading public organizations employ most of these rules as well. Both studies, in private and public organizations, found that a dynamic environment calls for dynamic management, and that is especially clear in how successful project managers think about their teams.
Fuzzy Based Decision Support System for Condition Assessment and Rating of Bridges
NASA Astrophysics Data System (ADS)
Srinivas, Voggu; Sasmal, Saptarshi; Karusala, Ramanjaneyulu
2016-09-01
In this work, a knowledge based decision support system has been developed to efficiently handle the issues such as distress diagnosis, assessment of damages and condition rating of existing bridges towards developing an exclusive and robust Bridge Management System (BMS) for sustainable bridges. The Knowledge Based Expert System (KBES) diagnoses the distresses and finds the cause of distress in the bridge by processing the data which are heuristic and combined with site inspection results, laboratory test results etc. The coupling of symbolic and numeric type of data has been successfully implemented in the expert system to strengthen its decision making process. Finally, the condition rating of the bridge is carried out using the assessment results obtained from the KBES and the information received from the bridge inspector. A systematic procedure has been developed using fuzzy mathematics for condition rating of bridges by combining the fuzzy weighted average and resolution identity technique. The proposed methodologies and the decision support system will facilitate in developing a robust and exclusive BMS for a network of bridges across the country and allow the bridge engineers and decision makers to carry out maintenance of bridges in a rational and systematic way.
NREL Fuels and Engines R&D Revs Up Vehicle Efficiency, Performance
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
NREL bridges fuels and engines R&D to maximize vehicle efficiency and performance. The lab’s fuels and engines research covers the full spectrum of innovation—from fuel chemistry, conversion, and combustion to the evaluation of how fuels interact with engine and vehicle design. This innovative approach has the potential to positively impact our economy, national energy security, and air quality.
Superhydrophobic engineered cementitious composites for highway applications : phase II.
DOT National Transportation Integrated Search
2013-06-01
The strength and durability of highway bridges are two of the key components in maintaining a : high level of freight transportation capacity on the nations highways. : The CFIRE project 04-09 demonstrated the feasibility of a new hybrid engineered...
Development of Specifications for Engineered Cementitious Composites for Use in Bridge Deck Overlays
DOT National Transportation Integrated Search
2016-02-01
Engineered cementitious composite (ECC) material is a high strength, fiber-reinforced, ductile mortar mixture that can exhibit tensile strains of up to 5%. ECC has a dense matrix, giving the material exceptional durability characteristics. The durabi...
Design procedures for heat-straightening repair : an engineering guide.
DOT National Transportation Integrated Search
1992-12-01
This report summarizes over four years of research on heat-straightening repairs and provides a prototype engineering guide for the application of heat-straightening to bridge structures. It is based on the research results detailed in a companion re...
STS-35: Mission Highlights Resource Tape
NASA Technical Reports Server (NTRS)
1995-01-01
Live footage shows the crewmembers of STS-35, Commander Vance D. Brand, Pilot Guy S. Gardner, Mission Specialists Jeffrey A. Hoffman, John M. Lounge, and Robert A. Parker, and Payload Specialists Samuel T. Durrance, and Ronald A. Parise, participating in the traditional breakfast prior to launch. The crew is seen suiting up, and walking out to the Astro-Van for their 1 a.m. launch. Also shown are some beautiful panoramic shots of the shuttle on the launch pad, main engine start, ignition, liftoff, and various shots of the Launch Control Center (LCC). The crew is also shown during flight performing some routine functions such as operating the trash compactor, eating, and getting into and out of their sleeping quarters. The crew is seen taking part in a conversation with the Secretary of State, and the Foreign Minister of the Soviet Union. Footage also includes the landing of Columbia, its rollout on the runway, and its crew as they depart from the vehicle.
STS-46 post flight press conference
NASA Astrophysics Data System (ADS)
1992-08-01
At a post flight press conference, the flight crew of the STS-46 mission (Cmdr. Loren Shriver, Pilot Andrew Allen, Mission Specialists Claude Nicollier (European Space Agency (ESA)), Marsha Ivins (Flight Engineer), Jeff Hoffman (Payload Commander), Franklin Chang-Dias, and Payload Specialist Franco Malerba (Italian Space Agency (ISA))) discussed their roles in and presented video footage, slides and still photographs of the different aspects of their mission. The primary objectives of the mission were the deployment of ESA's European Retrievable Carrier (EURECA) satellite and the joint NASA/ISA deployment and testing of the Tethered Satellite System (TSS). Secondary objectives included the IMAX Camera, the Limited Duration Space Environment Candidate Materials Exposure (LDVE), and the Pituitary Growth Hormone Cell Function (PHCF) experiments. Video footage of the EURECA and TSS deployment procedures are shown. Earth views were extensive and included Javanese volcanoes, Amazon basin forest ground fires, southern Mexico, southern Bolivian volcanoes, south-west Sudan and the Sahara Desert, and Melville Island, Australia. Questions from reporters and journalists from Johnson Space Center and Kennedy Space Center were discussed.
STS-46 Post Flight Press Conference
NASA Technical Reports Server (NTRS)
1992-01-01
At a post flight press conference, the flight crew of the STS-46 mission (Cmdr. Loren Shriver, Pilot Andrew Allen, Mission Specialists Claude Nicollier (European Space Agency (ESA)), Marsha Ivins (Flight Engineer), Jeff Hoffman (Payload Commander), Franklin Chang-Dias, and Payload Specialist Franco Malerba (Italian Space Agency (ISA))) discussed their roles in and presented video footage, slides and still photographs of the different aspects of their mission. The primary objectives of the mission were the deployment of ESA's European Retrievable Carrier (EURECA) satellite and the joint NASA/ISA deployment and testing of the Tethered Satellite System (TSS). Secondary objectives included the IMAX Camera, the Limited Duration Space Environment Candidate Materials Exposure (LDVE), and the Pituitary Growth Hormone Cell Function (PHCF) experiments. Video footage of the EURECA and TSS deployment procedures are shown. Earth views were extensive and included Javanese volcanoes, Amazon basin forest ground fires, southern Mexico, southern Bolivian volcanoes, south-west Sudan and the Sahara Desert, and Melville Island, Australia. Questions from reporters and journalists from Johnson Space Center and Kennedy Space Center were discussed.
Engineer: The Professional Bulletin of Army Engineers. Volume 38, PB 5-08-3/4, July-December 2008
2008-12-01
50 The Battle of Shiloh By Captain John T. Shelton 54 Pioneering Nondoctrinal Bridging Operations: The “Roller Skate ” Repair By First...for Army Lessons Learned (CALL) to conduct an Engineer and Base Camp Collection and Analysis Team (CAAT). As a result of this trip, we collected a...provided an outbrief at the 20th Engineer Brigade Lessons Learned Conference in December. Many thanks to the 20th Engineer Brigade, 926th Engineer
Concept Development Modular Hybrid Pier (MHP)
2000-02-01
rated FRP composite bridge or bridge deck is commercially available from Creative Pultrusions, Kansas Structural Systems, Martin - Marietta , Hardcore...NAVAL FACILITIES ENGINEERING SERVICE CENTER Port Hueneme, California 93043-4370 Contract Report CR 00-001-SHR FINAL REPORT PHASE 1 - CONCEPT...20000301 043 Approved for public release; distribution is unlimited. DTIC QUALITY IMWSOfBD 4 ^^ Printed on recycled paper REPORT DOCUMENTATION PAGE
Plans for crash-tested bridge railings for longitudinal wood decks on low-volume roads
Michael A. Ritter; Ronald K. Faller; Steve Bunnell; Paula D. Hilbrich Lee; Barry T. Rosson
1998-01-01
The plans for crashworthy bridge railings for low-volume roads were developed through a cooperative research program involving the USDA Forest Service, Forest Products Laboratory (FPL); the Midwest Roadside Safety Facility, University of Nebraska-Lincoln (MwRSF); and the Forest Service, National Forest System, Engineering. Three railings were developed and successfully...
32. VERTICAL OSCILLATIONS, 3/4 VIEW, 7 NOVEMBER 1940, FROM 16MM ...
32. VERTICAL OSCILLATIONS, 3/4 VIEW, 7 NOVEMBER 1940, FROM 16MM FILM SHOT PROFESSOR F.B. FARQUHARSON, UNIVERSITY OF WASHINGTON. (LABORATORY STUDIES ON THE TACOMA NARROWS BRIDGE, AT UNIVERSITY OF WASHINGTON (SEATTLE: UNIVERSITY OF WASHINGTON, DEPARTMENT OF CIVIL ENGINEERING, 1941) - Tacoma Narrows Bridge, Spanning Narrows at State Route 16, Tacoma, Pierce County, WA
Building Bridges, Robots, and High Expectations
ERIC Educational Resources Information Center
Bennie, Fiona; Corbett, Charlotte; Palo, Angela
2015-01-01
This article describes an after-school program at the Horace Mann School for the Deaf (HMS), the oldest public day school for deaf students in the United States, where almost half of the student body imagined and created bridge and robotic machines. The Deaf Robotics Engineering and Math Team, or the DREAM Team club, included HMS students in…
Smart timber bridge on geosynthetic reinforced soil (GRS) abutments
Adam Senalik; James P. Wacker; Travis K. Hosteng; John Hermanson
2017-01-01
Recently, Buchanan County, Iowa, has cooperated with the U.S. Federal Highway Administration (FHWA), USDA Forest Service, Forest Products Laboratory (FPL), and Iowa State Universityâs Bridge Engineering Center (ISUâBEC) to initiate a project involving the construction and monitoring of a glued-laminated (glulam) timber superstructure on geosynthetic reinforced soil (...
ERIC Educational Resources Information Center
Tomasko, David L.; Ridgway, Judith S.; Waller, Rocquel J.; Olesik, Susan V.
2016-01-01
Retention of students to science, technology, engineering, and mathematics (STEM) major has been studied for four cohorts participating in a summer bridge program supported by the National Science Foundation. Students participated in a 6-week program prior to their first term of enrollment at a research-intensive land grant university. Comparisons…
Learning Based on the Project Entitled "Design and Construction of a Wooden Bridge"
ERIC Educational Resources Information Center
Barris, Cristina; Torres, Lluís; Simon, Enric
2016-01-01
This article presents the results of a case involving the application of project-based learning carried out with students in the Mechanical Engineering degree program at the University of Girona. The project, entitled "Design and construction of a wooden bridge", was conducted at the Polytechnic School in the third-year Structures…
"Bridging" Engineering & Art: An Outreach Approach for Middle and High School Students
ERIC Educational Resources Information Center
Asiabanpour, Bahram; DesChamps-Benke, Nicole; Wilson, Thomas; Loerwald, Matthew; Gourgey, Hannah
2010-01-01
This paper describes a novel outreach approach to high school and middle school students to familiarize them with engineering functions and methods. In this approach students participated in a seven-day summer research camp and learned many engineering skills and tools such as CAD solid modeling, finite element analysis, rapid prototyping,…
CREW TRAINING (TOYS) - STS-51E - JSC
1985-01-26
S85-26476 (1 February 1985) --- Astronaut Jeffrey A. Hoffman, 51-D mission specialist, goes through a one-G simulation of operation of a friction-powered toy car in NASA's one-G Shuttle trainer at the Johnson Space Center.
Information-theoretical noninvasive damage detection in bridge structures
NASA Astrophysics Data System (ADS)
Sudu Ambegedara, Amila; Sun, Jie; Janoyan, Kerop; Bollt, Erik
2016-11-01
Damage detection of mechanical structures such as bridges is an important research problem in civil engineering. Using spatially distributed sensor time series data collected from a recent experiment on a local bridge in Upper State New York, we study noninvasive damage detection using information-theoretical methods. Several findings are in order. First, the time series data, which represent accelerations measured at the sensors, more closely follow Laplace distribution than normal distribution, allowing us to develop parameter estimators for various information-theoretic measures such as entropy and mutual information. Second, as damage is introduced by the removal of bolts of the first diaphragm connection, the interaction between spatially nearby sensors as measured by mutual information becomes weaker, suggesting that the bridge is "loosened." Finally, using a proposed optimal mutual information interaction procedure to prune away indirect interactions, we found that the primary direction of interaction or influence aligns with the traffic direction on the bridge even after damaging the bridge.
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 28, 1942 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, general view upstream from Franklin Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, April 8, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, general view downstream at Stone Arch Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, March 27, 1942 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, view of stadium upstream from point bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 28, 1942 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, general view downstream from Hickory Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, June 10, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, view of construction downstream at First Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 19, 1943 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 6, general view upstream from Hickory Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, December 4, 1939 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, general view downstream from Fourth Avenue Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, April 3, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, general view downstream at Fourth Avenue Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, May 21, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, view downstream from Walnut Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, May 28, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, view upstream from Franklin Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, June 27, 1939 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 2, general view downstream from Coopersdale Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, May 28, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, view downstream from Hickory Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, March 27, 1942 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 4, general view upstream from Johns Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, April 3, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, general view upstream at Fourth Avenue Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, June 27, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, general view downstream from Point Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 18, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 2, general view from Coopersdale Bridge ramp - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, September 27, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, general view downstream toward ten acre railroad bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 19, 1943 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 6, general view downstream from Horner Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, May 28, 1941 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 6, view upstream from Hickory Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, July, 11, 1942 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, general view upstream from incline bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Value engineering and cost effectiveness of various fiber reinforced polymer (FRP) repair systems.
DOT National Transportation Integrated Search
2006-06-01
Seventeen 40 year old C-Channel type prestressed concrete bridge girders and one impact damaged AASHTO : Type II prestressed concrete girder were tested under static and fatigue loading to determine the cost-effectiveness : and value engineering aspe...
ERIC Educational Resources Information Center
Pai, Devdas M.; DeBlasio, Richard A.
1997-01-01
The example of Alcoa and North Carolina State University shows that partnerships in course design, development, and delivery can result in an engineering curriculum that bridges theory and practice and makes students aware of industry expectations. (SK)
11. Photocopy of an elevation drawing (dated January 1924, B.J. ...
11. Photocopy of an elevation drawing (dated January 1924, B.J. Garnett, Designing Engineer, H.S. Baker, County Engineer), housed at the Spokane County Public Works Department, Spokane - Latah Creek Bridge No. 4102, Prairie View Road, Waverly, Spokane County, WA
Dynamic and Fatigue Analysis of an 18th Century Steel Arch Bridge
NASA Astrophysics Data System (ADS)
Boumechra, Nadir; Hamdaoui, Karim
2008-07-01
Within the "Oran-Tlemcen" railway line realization project (159 km), several bridges were built by the Railroads Algerian West Company. 7 km from the east of Tlemcen city, this railway line must cross a very broken mountainous collar, that's why the French engineer "Gustave Eiffel" was solicited to construct a 68 m length bridge. In 1890, an arch steel truss bridge was realized. The bridge presents 300 m of apron curvature radius and, currently, is considered as one of the most important monuments of the Algerian historical heritage. Considering the age of the bridge and the evolution of the railway loads in time, it was essential to check the good behavior of the studied structure. For that, analyses to verify the physical and mechanical properties of the growth iron members are made. A finite element model of the bridge was built and numerical simulations were drawn. The structural vibration conducted analysis permit to understand the behavior of this particular structure, then to evaluate (in detail) the rate of the structure fatigue.
Photographic copy of undated 12 x 36 pen and ink ...
Photographic copy of undated 12 x 36 pen and ink drawing by Modjeski, Masters and Chase, Bridge Engineers. Illustrator Unknown. Loose in oversized box located at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. PEN AND INK DRAWING OF FINAL PROPOSAL OF BRIDGE OVER THE MISSISSIPPI RIVER, NEW ORLEANS, LA. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA
Seismic design guidelines for highway bridges
NASA Astrophysics Data System (ADS)
Mayes, R. L.; Sharpe, R. L.
1981-10-01
Guidelines for the seismic design of highway bridges are given. The guidelines are the recommendations of a team of nationally recognized experts which included consulting engineers, academicians, State highway, and Federal agency representatives from throughout the United States. The guidelines are comprehensive in nature and they embody several new concepts which are significant departures from existing design provisions. An extensive commentary documenting the basis for the guidelines and an example demonstrating their use are included. A draft of the guidelines was used to seismically redesign twenty-one bridges. A summary of the redesigns is included.
Chen, Genda; Witt, Emitt C.; Hoffman, David; Luna, Ronaldo; Sevi, Adam
2007-01-01
The Interstate 10 Twin Span Bridge over Lake Pontchartrain north of New Orleans, La., was rendered completely unusable by Hurricane Katrina. The cause of the collapse of the bridges generated great interest among hydrologists and structural engineers as well as among the general public. What made this case study even more important was the fact that two nearby bridges sustained the effects of the same storm surge and suffered only light damage. Lessons learned from this investigation are invaluable to maintaining the safety of many of the Nation's coastal and river-crossing bridges.
Mission control activity during STS-61 EVA-1
1993-12-05
Joseph Fanelli, at the Integrated Communications Officer console, monitors the televised activity of Astronauts Story Musgrave and Jeffrey A. Hoffman. The vetern astronauts were performing the first extravehicular activity (EVA-1) of the STS-61 Hubble Space Telescope (HST) servicing mission.
Hazardous Waste Cleanup: DSM Nutritional Products Incorporated in Belvidere, New Jersey
DSM Nutritional Products, Inc., formerly Hoffman-LaRoche (Roche) Belvidere is located on Maunkachunk Road in White Township, New Jersey. The site occupies approximately 500 acres in Warren County. The facility has been manufacturing vitamins since 1961.
Multi-Variant/Capability Next Generation Troop Seat (M-V/C NGTS)
2009-01-01
John Plaga , Work Unit Manager MARK M. HOFFMAN Deputy Chief Biomechanics Branch Biosciences and Protection Division Human...John A. Plaga a. REPORT U b. ABSTRACT U c. THIS PAGE U SAR 20 19b. TELEPHONE NUMBER (include area
Science Operation in Space: Lessons
NASA Technical Reports Server (NTRS)
1988-01-01
This program (conceived by a group of veteran Shuttle astronauts) shows prospective experimenters how they can better design their experiments for operation onboard Shuttle flights. Shuttle astronauts Dunbar, Seddon, Hoffman, Cleave, Ross, and ChangDiaz also show how crews live and work in space.
ERIC Educational Resources Information Center
Floyd, Debbie L., Ed.
1981-01-01
Contains John Hoffman's "Continuing Education for the Elderly," which describes Panola Junior College's (Texas) programs; Judith Seed's "Tutor Training for Business and Industry," on La Guardia Community College's (New York) Adult Learning Center; and "Secretaries as Professionals" by Jo Lynn Samuelson, describing Sierra College's (California)…
... Clinic Proceedings. 2015;90:1283. Connolly HM. Medical management of cyanotic congenital heart disease in adults. http://www.uptodate.com/home. Accessed Dec. 8, 2015. Hoffman R, et al. The polycythemias. In: Hematology: Basic Principles and Practice. 6th ed. Philadelphia, Pa.: Saunders Elsevier; ...
Damage assessment of bridge infrastructure subjected to flood-related hazards
NASA Astrophysics Data System (ADS)
Michalis, Panagiotis; Cahill, Paul; Bekić, Damir; Kerin, Igor; Pakrashi, Vikram; Lapthorne, John; Morais, João Gonçalo Martins Paulo; McKeogh, Eamon
2017-04-01
Transportation assets represent a critical component of society's infrastructure systems. Flood-related hazards are considered one of the main climate change impacts on highway and railway infrastructure, threatening the security and functionality of transportation systems. Of such hazards, flood-induced scour is a primarily cause of bridge collapses worldwide and one of the most complex and challenging water flow and erosion phenomena, leading to structural instability and ultimately catastrophic failures. Evaluation of scour risk under severe flood events is a particularly challenging issue considering that depth of foundations is very difficult to evaluate in water environment. The continual inspection, assessment and maintenance of bridges and other hydraulic structures under extreme flood events requires a multidisciplinary approach, including knowledge and expertise of hydraulics, hydrology, structural engineering, geotechnics and infrastructure management. The large number of bridges under a single management unit also highlights the need for efficient management, information sharing and self-informing systems to provide reliable, cost-effective flood and scour risk management. The "Intelligent Bridge Assessment Maintenance and Management System" (BRIDGE SMS) is an EU/FP7 funded project which aims to couple state-of-the art scientific expertise in multidisciplinary engineering sectors with industrial knowledge in infrastructure management. This involves the application of integrated low-cost structural health monitoring systems to provide real-time information towards the development of an intelligent decision support tool and a web-based platform to assess and efficiently manage bridge assets. This study documents the technological experience and presents results obtained from the application of sensing systems focusing on the damage assessment of water-hazards at bridges over watercourses in Ireland. The applied instrumentation is interfaced with an open-source platform that can offer a more economical remote monitoring solution. The results presented in this investigation provide an important guide for a multidisciplinary approach to bridge monitoring and can be used as a benchmark for the field application of cost-effective and robust sensing methods. This will deliver key information regarding the impact of water-related hazards at bridge structures through an integrated structural health monitoring and management system. Acknowledgement: The authors wish to acknowledge the financial support of the European Commission, through the Marie Curie action Industry-Academia Partnership and Pathways Network BRIDGE SMS (Intelligent Bridge Assessment Maintenance and Management System) - FP7-People-2013-IAPP- 612517.
NASA Astrophysics Data System (ADS)
Ambati, Jyothirmai
This dissertation presents studies of the synthetic processes and applications of siloxane-based materials. Kinetic investigations of bridged organoalkoxysilanes that are precursors to organic-inorganic hybrid polysilsesquioxanes are a primary focus. Quick gelation despite extensive cyclization is found during the polymerization of bridged silane precursors except for silanes with certain short bridges. This work is an attempt to characterize and understand some of the distinct features of bridged silanes using experimental characterization, kinetic modeling and simulation. In addition to this, the dissertation shows how the properties of siloxane-materials can be engineered for drug delivery and adsorption. The phase behavior of polymerizing mixtures is first investigated to identify the solutions that favor kinetic characterization. Microphase separation is found to cause gradual loss of NMR signal for certain initial compositions. Distortionless Enhancement by Polarization Transfer 29Si NMR is employed to identify the products of polymerization of some short-bridged silanes under no signal loss conditions. This technique requires knowing indirect 29Si-1H scalar coupling constants which sometimes cannot be measured due to second-order effects. However, the B3LYP density functional method with 6-31G basis set is found to predict accurate 29Si- 1H coupling constants of organoalkoxysilanes and siloxanes. The scalar coupling constants thus estimated are employed to resolve non-trivial coupled NMR spectra and quantitative kinetic modeling is performed using the DEPT Si NMR transients. In order to investigate the role of the organic bridging group, the structural evolution of bridged and non-bridged silanes are compared using Monte Carlo simulations. Kinetic and simulation models suggest that cyclization plays a key role right from the onset of polymerization for bridged silanes even more than in non-bridged silanes. The simulations indicate that the carbosiloxane rings formed from short-bridged precursors slow down but do not prevent gelation. The tuning of siloxane-based materials for adsorption technologies are also discussed here. In the first example, antioxidant enzyme loading is investigated as a means to reduce oxidative stress generated by silica nanoparticle drug carriers. Materials are engineered for promising enzyme loading and protection from proteolysis. Second, the potential of copper sulfate impregnation to enhance adsorption of ammonia by silica is explored by molecular simulation. KEYWORDS: Sol-gel Polymerization, Kinetic Investigation, Si NMR, Bridged Silanes, DFT Calculations.
Teixeira, Ana P; Carinhas, Nuno; Dias, João M L; Cruz, Pedro; Alves, Paula M; Carrondo, Manuel J T; Oliveira, Rui
2007-12-01
Systems biology is an integrative science that aims at the global characterization of biological systems. Huge amounts of data regarding gene expression, proteins activity and metabolite concentrations are collected by designing systematic genetic or environmental perturbations. Then the challenge is to integrate such data in a global model in order to provide a global picture of the cell. The analysis of these data is largely dominated by nonparametric modelling tools. In contrast, classical bioprocess engineering has been primarily founded on first principles models, but it has systematically overlooked the details of the embedded biological system. The full complexity of biological systems is currently assumed by systems biology and this knowledge can now be taken by engineers to decide how to optimally design and operate their processes. This paper discusses possible methodologies for the integration of systems biology and bioprocess engineering with emphasis on applications involving animal cell cultures. At the mathematical systems level, the discussion is focused on hybrid semi-parametric systems as a way to bridge systems biology and bioprocess engineering.
Assessing potential scour using the South Carolina bridge-scour envelope curves
Benedict, Stephen T.; Feaster, Toby D.; Caldwell, Andral W.
2016-09-30
SummaryBridge-scour equations presented in the Federal Highway Administration Hydraulic Engineering Circular No. 18 reflect the current state-of-the practice for predicting scour at bridges. Although these laboratory-derived equations provide an important resource for assessing scour potential, there is a measure of uncertainty when applying these equations to field conditions. The uncertainty and limitations have been acknowledged by laboratory researchers and confirmed in field investigations.Because of the uncertainty associated with bridge-scour equations, HEC-18 recommends that engineers evaluate the computed scour depths obtained from the equations and modify the resulting data if they appear unreasonable. Perhaps the best way to evaluate the reasonableness of predicted scour is to compare it to field measurements of historic scour. Historic field data show scour depths resulting from high flows and provide a reference for evaluating predicted scour. It is rare, however, that such data are available at or near a site of interest, making the evaluation of predicted scour as compared to field data difficult if not impossible. Realizing the value of historic scour measurements, the U.S. Geological Survey (USGS), in cooperation with the South Carolina Department of Transportation (SCDOT), conducted a series of three field investigations to collect historic scour data with the goal of understanding regional trends of scour at riverine bridges in South Carolina.Historic scour measurements, including measurements of clear-water abutment, contraction, and pier scour, as well as live-bed contraction and pier scour, were made at more than 200 bridges. These field investigations provided valuable insights into regional scour trends and yielded regional bridge-scour envelope curves that can be used as supplementary tools for assessing all components of scour at riverine bridges in South Carolina.The application and limitations of these envelope curves were documented in four reports. Because each report addresses different components of bridge scour, it was recognized that there was a need to develop an integrated procedure for applying the envelope curves to help assess scour potential at riverine bridges in South Carolina. The result of that effort is detailed in Benedict and others (2016) and summarized in this fact sheet.
NASA Astrophysics Data System (ADS)
Dare, Emily Anna
According to the American Physical Society, women accounted for only 20% of bachelor's degrees in the fields of physics and engineering in 2010. This low percentage is likely related to young girls' K-12 education experiences, particularly their experiences prior to high school, during which time young women's perceptions of Science, Technology, Engineering, and Math (STEM) and STEM careers are formed (Catsambis, 1995; Maltese & Tai, 2011; National Research Council, 2012; Sadler, Sonnert, Hazari, & Tai, 2012; Tai, Liu, Maltese, & Fan, 2006; Scantlebury, 2014; Sikora & Pokropek, 2012). There are no significant gender differences in academic achievement in middle school, yet young women have less positive attitudes towards careers in science than their male peers (Catsambis, 1995; Scantlebury, 2014). This suggests that the low female representation in certain STEM fields is a result of not their abilities, but their perceptions; for fields like physics where negative perceptions persist (Haussler & Hoffman, 2002; Labudde, Herzog, Neuenschander, Violi, & Gerber, 2000), it is clear that middle school is a critical time to intervene. This study examines the perceptions of 6th grade middle school students regarding physics and physics-related careers. A theoretical framework based on the literature of girl-friendly and integrated STEM strategies (Baker & Leary, 1995; Halpern et al., 2007; Haussler & Hoffman, 2000, 2002; Labudde et al., 2000; Moore et al., 2014b; Newbill & Cennamo, 2008; Rosser, 2000; Yanowitz, 2004) guided this work to understand how these instructional strategies may influence student's perceptions of physics for both girls and boys. The overarching goal of this work was to understand similarities and differences between girls' and boys' perceptions about physics and physics-related careers. This convergent parallel mixed-methods study uses a series of student surveys and focus group interviews to identify and understand these similarities and differences. Classroom observations also helped to identify what instructional strategies teachers used that influence student perceptions. Findings from this study indicate very few differences between the perceptions of physics and physics-related careers for 6th grade girls and boys. However, the differences that exist, though subtle, may indicate how K-12 science instruction could more positively influence girls' perceptions. For instance, while girls are just as interested in science class as their male counterparts, they are more motivated when a social context is included; this has implications for how they view physics-related careers. The findings of this study shed light on not only why fewer females pursue careers in physics, but also how K-12 science reform efforts might help to increase these numbers.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-05
.... Army Corps of Engineers Locks, Sault Sainte Marie, MI AGENCY: Coast Guard, DHS. ACTION: Temporary final... Fireworks, St Mary's River, U.S. Army Corps of Engineers Locks, Sault Sainte Marie, MI; in the Federal... celebration, fireworks will be launched from the northeast pier of the U.S. Army Corp of Engineers Soo Locks...
23 CFR 661.37 - What are the funding limitations on individual IRRBP projects?
Code of Federal Regulations, 2014 CFR
2014-04-01
... ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.37 What are the funding..., with a $150,000 maximum limit for PE. (b) An IRRBP eligible non-BIA owned IRR bridge is eligible for up to 80 percent IRRBP funding, with a $150,000 maximum limit for PE and $1,000,000 maximum limit for...
23 CFR 661.37 - What are the funding limitations on individual IRRBP projects?
Code of Federal Regulations, 2012 CFR
2012-04-01
... ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.37 What are the funding..., with a $150,000 maximum limit for PE. (b) An IRRBP eligible non-BIA owned IRR bridge is eligible for up to 80 percent IRRBP funding, with a $150,000 maximum limit for PE and $1,000,000 maximum limit for...
23 CFR 661.37 - What are the funding limitations on individual IRRBP projects?
Code of Federal Regulations, 2013 CFR
2013-04-01
... ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.37 What are the funding..., with a $150,000 maximum limit for PE. (b) An IRRBP eligible non-BIA owned IRR bridge is eligible for up to 80 percent IRRBP funding, with a $150,000 maximum limit for PE and $1,000,000 maximum limit for...
23 CFR 661.37 - What are the funding limitations on individual IRRBP projects?
Code of Federal Regulations, 2010 CFR
2010-04-01
... ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.37 What are the funding..., with a $150,000 maximum limit for PE. (b) An IRRBP eligible non-BIA owned IRR bridge is eligible for up to 80 percent IRRBP funding, with a $150,000 maximum limit for PE and $1,000,000 maximum limit for...
23 CFR 661.37 - What are the funding limitations on individual IRRBP projects?
Code of Federal Regulations, 2011 CFR
2011-04-01
... ENGINEERING AND TRAFFIC OPERATIONS INDIAN RESERVATION ROAD BRIDGE PROGRAM § 661.37 What are the funding..., with a $150,000 maximum limit for PE. (b) An IRRBP eligible non-BIA owned IRR bridge is eligible for up to 80 percent IRRBP funding, with a $150,000 maximum limit for PE and $1,000,000 maximum limit for...
PBF detail of metal pedestrian bridge over exposed control cables, ...
PBF detail of metal pedestrian bridge over exposed control cables, which run between Control (PER-619) and Reactor Buildings (PER-620). Camera facing northwest. Southwest corner of PER-620 at upper right of view. Date: May 2004. INEEL negative no. HD-41-6-3 - Idaho National Engineering Laboratory, SPERT-I & Power Burst Facility Area, Scoville, Butte County, ID
34. VERTICAL AND TORSIONAL MOTION VIEWED FROM EAST TOWER, 7 ...
34. VERTICAL AND TORSIONAL MOTION VIEWED FROM EAST TOWER, 7 NOVEMBER 1940, FROM 16MN FILM SHOT BY PROFESSOR F.B. FARQUHARSON, UNIVERSITY OF WASHINGTON. (LABORATORY STUDIES ON THE TACOMA NARROWS BRIDGE, AT UNIVERSITY OF WASHINGTON (SEATTLE: UNIVERSITY OF WASHINGTON, DEPARTMENT OF CIVIL ENGINEERING, 1941) - Tacoma Narrows Bridge, Spanning Narrows at State Route 16, Tacoma, Pierce County, WA
33. VERTICAL AND TORSIONAL OSCILLATIONS, 3/4 VIEW, 7 NOVEMBER 1940, ...
33. VERTICAL AND TORSIONAL OSCILLATIONS, 3/4 VIEW, 7 NOVEMBER 1940, FROM 16MN FILM SHOT BY PROFESSOR F.B. FARQUHARSON, UNIVERSITY OF WASHINGTON. (LABORATORY STUDIES ON THE TACOMA NARROWS BRIDGE, AT UNIVERSITY OF WASHINGTON (SEATTLE: UNIVERSITY OF WASHINGTON, DEPARTMENT OF CIVIL ENGINEERING, 1941) - Tacoma Narrows Bridge, Spanning Narrows at State Route 16, Tacoma, Pierce County, WA
16. PHOTOCOPY OF HISTORIC VIEW, HALFTONE PLATE DEPICTING CONSTRUCTION OF ...
16. PHOTOCOPY OF HISTORIC VIEW, HALF-TONE PLATE DEPICTING CONSTRUCTION OF BOSTON STREET BRIDGE, DATED DECEMBER 21, 1901, AND SHOWING CONCENTRIC RING OR ROWLOCK BOND CONSTRUCTION TECHNIQUE (HALF-TONE PLATE PUBLISHED IN BALTIMORE CITY ENGINEER'S ANNUAL REPORT FOR 1901, COURTESY ENOCH PRATT FREE LIBRARY) - Boston Street Bridge, Spanning Harris Creek Sewer at Boston Street, Baltimore, Independent City, MD
Full-scale monitoring of wind and suspension bridge response
NASA Astrophysics Data System (ADS)
Snæbjörnsson, J. T.; Jakobsen, J. B.; Cheynet, E.; Wang, J.
2017-12-01
Monitoring of real structures is important for many reasons. For structures susceptible to environmental actions, full-scale observations can provide valuable information about the environmental conditions at the site, as well as the characteristics of the excitation acting on the structure. The recorded data, if properly analyzed, can be used to validate and/or update experiments and models used in the design of new structures, such as the load description and modelling of the structural response. Various aspects of full-scale monitoring are discussed in the paper and the full-scale wind engineering laboratory at the Lysefjord suspension bridge introduced. The natural excitation of the bridge comes from wind and traffic. The surrounding terrain is complex and its effect on the wind flow can only be fully studied on site, in full-scale. The monitoring program and associated data analysis are described. These include various studies of the relevant turbulence characteristics, identification of dynamic properties and estimation of wind- and traffic-induced response parameters. The overall monitoring activity also included a novel application of the remote optical sensing in bridge engineering, which is found to have an important potential to complement traditional “single-point” wind observations by sonic anemometers.
Role to Be Played by Independent Geotechnical Supervision in the Foundation for Bridge Construction
NASA Astrophysics Data System (ADS)
Sobala, Dariusz; Rybak, Jarosław
2017-10-01
Some remarks concerning the necessity of employing an independent and over all ethical geotechnical survey were presented in the paper. Starting from the design phase, through the whole construction process, the importance of geotechnical engineer is stated in legal acts. Numerous testing technologies serve for the calibration of geotechnical technologies and allow for confirming the quality and capacity of piles. Special emphasis was payed to the involvement of scientifical and research institutions which can not only serve services but also can postprocess and methodize collected data. Such databases enable for new codes, methods and recommendations. Selection of deep foundations for bridge-type structures is most often dependent on complex geotechnical conditions, concentrated loads and constraints for pier displacements. Besides the last ones, prior to more common introduction of the design-construct system, could be a convenient justification for design engineer, who imposed deep foundation because he did not want or was not able to estimate the effect of pier settlement on civil engineering structure. The paper provides some notes about the need to engage a geotechnical supervising service of high competency and ethical quality during engineering and construction stages of foundations for bridge-type structures where legal requirements are of special consideration. Successive stages of projects are reviewed and research methods used for current calibration of geotechnical technologies and verification of geotechnical work quality are analysed. Special attention is given to potential involvement of independent R&D institutions which, apart from rendering specific services, also collect and systemize the research results thus enabling, in the long term, to revise engineering standards, instructions and guidelines.
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, May 23, 1940 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 3, view of channel excavation downstream at Fourth Avenue Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, November 19, 1943 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 6, view of WPA masonry wall and dike upstream from Central Avenue Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Photographic copy of historic photograph, by Corps of Engineers, U.S. ...
Photographic copy of historic photograph, by Corps of Engineers, U.S. Army, April 24, 1942 (original in possession of Corps of Engineers, U.S. Army, Pittsburgh District, Engineering Division files) Unit 5, view of channel excavation upstream at Franklin Street Bridge - Johnstown Local Flood Protection Project, Beginning on Conemaugh River approx 3.8 miles downstream from confluence of Little Conemaugh & Stony Creek Rivers at Johnstown, Johnstown, Cambria County, PA
Vice President Pence Tours Jet Propulsion Laboratory
2018-04-28
U.S. Vice President Mike Pence, his wife Karen, and their daughter Charlotte shake hands with Mars Curiosity Mission ACE Walt Hoffman, right, during a tour of NASA's Jet Propulsion Laboratory, Saturday, April 28, 2018 in Pasadena, California. Photo Credit: (NASA/Bill Ingalls)
24. OLD TIOGA ROAD VIEW, NOW MAY LAKE ROAD , ...
24. OLD TIOGA ROAD VIEW, NOW MAY LAKE ROAD , AT SNOW FLAT. MOUNT HOFFMAN AT CENTER REAR. LOOKING NW. GIS: N-37 49 34.6 / W-119 29 58.2 - Tioga Road, Between Crane Flat & Tioga Pass, Yosemite Village, Mariposa County, CA
Defining Tailored Training Approaches for Army Institutional Training
2013-03-01
teachers object to being assigned to the lower ranking groups, which may further depress academic growth. Finally, critics say that ability grouping...for research, theory, and applications. In D. S. Gorfein and R. R. Hoffman (Eds.), Memory and learning: The Ebbinghaus centennial conference
1. GENERAL OFFICE BUILDING FOR THE HOMESTEAD WORKS, DESIGNED BY ...
1. GENERAL OFFICE BUILDING FOR THE HOMESTEAD WORKS, DESIGNED BY HOFFMAN & CRUMPTON OF PITTSBURGH. THE BUILDING WAS DESIGNED TO SHOWCASE THE ARCHITECTURAL POSSIBILITIES OF STEEL. - U.S. Steel Homestead Works, Auxiliary Buildings & Shops, Along Monongahela River, Homestead, Allegheny County, PA
41. PHOTOGRAPHY OF BLUE PRINT (MINNEAPOLIS CITY ENGINEER) END AND ...
41. PHOTOGRAPHY OF BLUE PRINT (MINNEAPOLIS CITY ENGINEER) END AND CENTRE CASTING OF CAST STEEL, MASONRY CASTING OF CAST IRON CASTING, FOR MINNEAPOLIS STEEL ARCH (4 x 5 negative) - Steel Arch Bridge, Hennepin Avenue spanning west channel of Mississippi River, Minneapolis, Hennepin County, MN
Tsunamis: bridging science, engineering and society.
Kânoğlu, U; Titov, V; Bernard, E; Synolakis, C
2015-10-28
Tsunamis are high-impact, long-duration disasters that in most cases allow for only minutes of warning before impact. Since the 2004 Boxing Day tsunami, there have been significant advancements in warning methodology, pre-disaster preparedness and basic understanding of related phenomena. Yet, the trail of destruction of the 2011 Japan tsunami, broadcast live to a stunned world audience, underscored the difficulties of implementing advances in applied hazard mitigation. We describe state of the art methodologies, standards for warnings and summarize recent advances in basic understanding, and identify cross-disciplinary challenges. The stage is set to bridge science, engineering and society to help build up coastal resilience and reduce losses. © 2015 The Author(s).
Numerical Simulations Of High-Altitude Aerothermodynamics Of A Prospective Spacecraft Model
NASA Astrophysics Data System (ADS)
Vashchenkov, P. V.; Kaskovsky, A. V.; Krylov, A. N.; Ivanov, M. S.
2011-05-01
The paper describes the computations of aerothermodynamic characteristics of a promising spacecraft (Prospective Piloted Transport System) along its de- scent trajectory at altitudes from 120 to 60 km. The computations are performed by the DSMC method with the use of the SMILE software system and by the engineering technique (local bridging method) with the use of the RuSat software system. The influence of real gas effects (excitation of rotational and vibrational energy modes and chemical reactions) on aerothermodynamic characteristics of the vehicle is studied. A comparison of results obtained by the approximate engineering method and the DSMC method allow the accuracy of prediction of aerodynamic characteristics by the local bridging method to be estimated.
4. INTERIOR OF ENGINE ROOM, CONTAINING UNITEDTOD TWINTANDEM ENGINE, FOR ...
4. INTERIOR OF ENGINE ROOM, CONTAINING UNITED-TOD TWIN-TANDEM ENGINE, FOR 40" BLOOMING MILL; AS SEEN FROM THE UPPER LEVEL BRIDGE CRANE, THIS ENGINE WAS THE DIRECT DRIVE TO THE 40" BLOOMING MILL LOCATED IN THE ADJACENT ROOM TO THE LEFT. THE UNITED-TOD ENGINE, A TWIN TANDEM COMPOUND STEAM ENGINE, WAS RATED AT 20,000 MP. IN 1946 NEW HIGH PRESSURE CYLINDERS WERE INSTALLED AND THE ENGINE RAN ON 200 PSI STEAM, WITH A 44"X76"X60" STROKE, TO A BUILT-UP COUNTER-BALANCED CENTER CRANK. - Republic Iron & Steel Company, Youngstown Works, Blooming Mill & Blooming Mill Engines, North of Poland Avenue, Youngstown, Mahoning County, OH
ERIC Educational Resources Information Center
Tempelman, E.; Pilot, A.
2011-01-01
In 2007, the Faculty of Industrial Design Engineering of the Delft University of Technology introduced a new bachelor program. Based on theories of learning and instruction three design principles were used to develop an approach that aims to make it easier for students to bridge the gap between theoretical design engineering courses and practical…
Load Distribution Factors for Composite Multicell Box Girder Bridges
NASA Astrophysics Data System (ADS)
Tiwari, Sanjay; Bhargava, Pradeep
2017-12-01
Cellular steel section composite with a concrete deck is one of the most suitable superstructures in resisting torsional and warping effects induced by highway loading. This type of structure has inherently created new design problems for engineers in estimating its load distribution when subjected to moving vehicles. Indian Codes of Practice does not provide any specific guidelines for the design of straight composite concrete deck-steel multi-cell bridges. To meet the practical requirements arising during the design process, a simple design method is needed for straight composite multi-cell bridges in the form of load distribution factors for moment and shear. This work presents load distribution characteristics of straight composite multi-cell box girder bridges under IRC trains of loads.
Ashley, Michael; Cooper, Katelyn M; Cala, Jacqueline M; Brownell, Sara E
2017-01-01
Summer bridge programs are designed to help transition students into the college learning environment. Increasingly, bridge programs are being developed in science, technology, engineering, and mathematics (STEM) disciplines because of the rigorous content and lower student persistence in college STEM compared with other disciplines. However, to our knowledge, a comprehensive review of STEM summer bridge programs does not exist. To provide a resource for bridge program developers, we conducted a systematic review of the literature on STEM summer bridge programs. We identified 46 published reports on 30 unique STEM bridge programs that have been published over the past 25 years. In this review, we report the goals of each bridge program and whether the program was successful in meeting these goals. We identify 14 distinct bridge program goals that can be organized into three categories: academic success goals, psychosocial goals, and department-level goals. Building on the findings of published bridge reports, we present a set of recommendations for STEM bridge programs in hopes of developing better bridges into college. © 2017 M. Ashley, K. M. Cooper, et al. CBE—Life Sciences Education © 2017 The American Society for Cell Biology. This article is distributed by The American Society for Cell Biology under license from the author(s). It is available to the public under an Attribution–Noncommercial–Share Alike 3.0 Unported Creative Commons License (http://creativecommons.org/licenses/by-nc-sa/3.0).
Orphan Receptor TR3/nur77 and Apoptosis in Prostate Cancer Cells
2004-07-01
chromosomal translocation identified in (Zhang et al. 1992b, Kastner et al. 1995, Mangelsdorf & extra-skeletal myxoid chondrosarcoma (Labelle et al...chromosomal 281-319. translocation in human chondrosarcomas is a highly potent Hoffman AD, Engelstein D, Bogenrieder T, Papandreou CN, transcriptional
Progress in Mathematical Programming.
1987-03-04
Philip Gill, Neal Glassman, Donald Goldfarb, Clovis Gonzaga, Harvey Greenberg , Peter Gritzmann, James K. Ho, Alan Hoffman, T. C. Hu, Hiroshi Imai...polar polytope P’ if 0 E P. The image trajectories are geodesics of a projectively invariant geometry on P 0 , Hilbert geometry. This work relates
The Nature of Empathy: Discriminant Analyses.
ERIC Educational Resources Information Center
Jegerski, Jane A.; Upshaw, Harry S.
Hoffman's (1975) theory holds that altruism is based on cognitive development and mechanisms for empathic distress present from birth, with the individual going through stages of personal distress, empathic concern, and perspective taking. The Davis Interpersonal Reactivity Index (IRI), a measure of empathy, contains four subscales: personal…
ERIC Educational Resources Information Center
Lukac, Jenco; And Others
1981-01-01
Includes Lukac's overview of an online acquisition system, Robert Newhard on information and ordinary living, Theodore Bolton on interactive home television, a survey of the CTI computer backup system by Joseph Covino and Sheila Intner, and three articles about catalogs and cataloging by Kenneth Bierman, Herbert Hoffman, and Judith Hudson. (RAA)
STS-46 MS Hoffman and MS Chang-Diaz wear masks during pre-breathe on OV-104
NASA Technical Reports Server (NTRS)
1992-01-01
STS-46 Mission Specialist (MS) and Payload Commander (PLC) Jeffrey A. Hoffman and MS Franklin R. Chang-Diaz, wearing breathing apparatus masks, pose on the forward flight deck of Atlantis, Orbiter Vehicle (OV) 104, during pre-breathe session. With the possibility of an extravehicular activity (EVA) being added to the STS-46 agenda, the astronauts reported to this station and began the 'pre-breathe' process when problems developed during the extension of the Tethered Satellite System 1 (TSS-1). When the human body is exposed to a sudden decrease in atmospheric pressure (for instance, from the 10.2 ppsi in the crew cabin to the 4.5 ppsi of the extravehicular mobility unit (EMU)), nitrogen traces in the bloodstream will expand. This expansion can create tiny bubbles and potential for the 'bends'. In order to lessen the effect, an astronaut must 'pre-breathe' pure oxygen (the same pure oxygen he will breathe in the suit) to help 'purge' nitrogen from his bloodstream before exerting himself
STS-61 crew utilizing Virtual Reality in training for HST repair mission
NASA Technical Reports Server (NTRS)
1993-01-01
Astronaut Jeffrey A. Hoffman, one of four crewmembers for STS-61 that will conduct scheduled spacewalks during the flight, wears a special helmet and gloves designed to assist in proper positioning near the telescope while on the end of the robot arm. Crewmembers are utilizing a new virtual reality training aid which assists in refining positioning patterns for Space Shuttle Endeavour's Remote Manipulator System (RMS) (36890); Astronaut Claude Nicollier looks at a computer display of the Shuttle's robot arm movements as Thomas D. Akers and Kathryn C. Thornton, mission specialists look on. Nicollier will be responsible for maneuvering the astronauts while they stand in a foot restraint on the end of the RMS arm (36891,36894); Hoffman wears a special helmet and gloves designed to assist in proper positioning near the telescope while on the end of the robot arm (35892); Nicollier looks at a computer display of the Shuttle's robot arm movements as Akers looks on (36893); While (l-r) Astron
NASA Astrophysics Data System (ADS)
Liu, Kai; Liu, Yuan; Liu, Yu-Rong; En, Yun-Fei; Li, Bin
2017-07-01
Channel mobility in the p-type polycrystalline silicon thin film transistors (poly-Si TFTs) is extracted using Hoffman method, linear region transconductance method and multi-frequency C-V method. Due to the non-negligible errors when neglecting the dependence of gate-source voltage on the effective mobility, the extracted mobility results are overestimated using linear region transconductance method and Hoffman method, especially in the lower gate-source voltage region. By considering of the distribution of localized states in the band-gap, the frequency independent capacitance due to localized charges in the sub-gap states and due to channel free electron charges in the conduction band were extracted using multi-frequency C-V method. Therefore, channel mobility was extracted accurately based on the charge transport theory. In addition, the effect of electrical field dependent mobility degradation was also considered in the higher gate-source voltage region. In the end, the extracted mobility results in the poly-Si TFTs using these three methods are compared and analyzed.
Design of pedestrian truss bridge with Sengon-Rubber laminated veneer lumber
NASA Astrophysics Data System (ADS)
Herbudiman, B.; Pranata, Y. A.; Pangestu, L.
2017-12-01
Timber bridges are one of the bridge that has long been used, but nowadays, large dimension of sawn timber has limited supply and also it is not environmental-friendly. Laminated veneer lumber (LVL) is a engineered wood that becomes one of the promising alternative, because it is made from lower quality wood that processed to be used as a more quality one. The bridge planned to be a pedestrian truss bridge with length of 9 m, width of 3 m, height of 2.5 m, and using bolt and steel plate as its connection system. Mechanical properties of LVL obtained directly from laboratory test result. Bridge modeling and planning for wood construction refers to SNI 7973:2013, while the loading refers to SNI 1725:2016. Based on the modelling and calculation, the dimension of truss frame and girder beam which are 9 cm x 9 cm and 9 cm x 18 cm have adequate strengths and satisfy deflection requirement.
Dynamic and Fatigue Analysis of an 18{sup th} Century Steel Arch Bridge
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boumechra, Nadir; Hamdaoui, Karim
2008-07-08
Within the 'Oran-Tlemcen' railway line realization project (159 km), several bridges were built by the Railroads Algerian West Company. 7 km from the east of Tlemcen city, this railway line must cross a very broken mountainous collar, that's why the French engineer 'Gustave Eiffel' was solicited to construct a 68 m length bridge. In 1890, an arch steel truss bridge was realized. The bridge presents 300 m of apron curvature radius and, currently, is considered as one of the most important monuments of the Algerian historical heritage. Considering the age of the bridge and the evolution of the railway loadsmore » in time, it was essential to check the good behavior of the studied structure. For that, analyses to verify the physical and mechanical properties of the growth iron members are made. A finite element model of the bridge was built and numerical simulations were drawn. The structural vibration conducted analysis permit to understand the behavior of this particular structure, then to evaluate (in detail) the rate of the structure fatigue.« less
Research on Damage Identification of Bridge Based on Digital Image Measurement
NASA Astrophysics Data System (ADS)
Liang, Yingjing; Huan, Shi; Tao, Weijun
2017-12-01
In recent years, the number of the damage bridge due to excessive deformation gradually increased, which caused significant property damage and casualties. Hence health monitoring and the damage detection of the bridge structure based on the deflection measurement are particularly important. The current conventional deflection measurement methods, such as total station, connected pipe, GPS, etc., have many shortcomings as low efficiency, heavy workload, low degree of automation, operating frequency and working time constrained. GPS has a low accuracy in the vertical displacement measurement and cannot meet the dynamic measured requirements of the current bridge engineering. This paper presents a bridge health monitoring and damage detection technology based on digital image measurement method in which the measurement accuracy is sub-millimeter level and can achieve the 24-hour automatic non-destructive monitoring for the deflection. It can be concluded from this paper that it is feasible to use digital image measurement method for identification of the damage in the bridge structure, because it has been validated by the theoretical analysis, the laboratory model and the application of the real bridge.
BIM authoring for an image-based bridge maintenance system of existing cable-supported bridges
NASA Astrophysics Data System (ADS)
Dang, N. S.; Shim, C. S.
2018-04-01
Infrastructure nowadays is increasingly become the main backbone for the metropolitan development in general. Along with the rise of new facilities, the demand in term of maintenance for the existing bridges is indispensable. Recently, the terminology of “preventive maintenance” is not unfamiliar with the engineer, literally is the use of a bridge maintenance system (BMS) based on a BIM-oriented model. In this paper, the process of generating a BMS based on BIM model is introduced in detail. Data management for this BMS is separated into two modules: site inspection system and information management system. The noteworthy aspect of this model lays on the closed and automatic process of “capture image, generate the technical damage report, and upload/feedback to the BMS” in real-time. A pilot BMS system for a cable-supported bridge is presented which showed a good performance and potential to further development of preventive maintenance.
Gender Differences in NATO Anthropometry and the Implication for Protective Equipment
2008-09-01
National Research Council 2800 Q Street Wright-Patterson AFB OH 45433-7947 Kathleen M. Robinette Biomechanics Branch Biosciences and Protection...Air Force Research Laboratory Human Effectiveness Directorate Biosciences and Protection Division Biomechanics ...BARRY REEDER, Work Unit Manager MARK M. HOFFMAN, Deputy Chief Biomechanics
Learner Autonomy: New Insights. = Autonomie de l'apprenant: nouvelles pistes.
ERIC Educational Resources Information Center
Dam, Leni, Ed.
2001-01-01
This book presents papers, written in both English and French, from a symposium entitled "Promoting Learner Autonomy: New Insights." After "Introduction" (Leni Dam), the eight papers include the following: "Examining the Discourse of Learner Advisory Sessions" (David Crabbe, Alison Hoffman, and Sara Cotteral);…
Teaching Language Arts: Learning through Dialogue.
ERIC Educational Resources Information Center
Lindfors, Judith Wells, Ed.; Townsend, Jane S., Ed.
Offering an alternative to traditional language arts methods textbooks, this collection of 20 essays by master teachers is grouped into 4 main sections. Following an introduction, essays in the book are: (1) "Walter" (Vivian Gussin Paley); (2) "Children Become Writers: A Conversation with Two Teachers" (Cyndy Hoffman and Carol…
Tissue engineered constructs for peripheral nerve surgery
Johnson, P. J.; Wood, M. D.; Moore, A. M.; Mackinnon, S. E.
2013-01-01
Summary Background Tissue engineering has been defined as “an interdisciplinary field that applies the principles of engineering and life sciences toward the development of biological substitutes that restore, maintain, or improve tissue function or a whole organ”. Traumatic peripheral nerve injury resulting in significant tissue loss at the zone of injury necessitates the need for a bridge or scaffold for regenerating axons from the proximal stump to reach the distal stump. Methods A review of the literature was used to provide information on the components necessary for the development of a tissue engineered peripheral nerve substitute. Then, a comprehensive review of the literature is presented composed of the studies devoted to this goal. Results Extensive research has been directed toward the development of a tissue engineered peripheral nerve substitute to act as a bridge for regenerating axons from the proximal nerve stump seeking the distal nerve. Ideally this nerve substitute would consist of a scaffold component that mimics the extracellular matrix of the peripheral nerve and a cellular component that serves to stimulate and support regenerating peripheral nerve axons. Conclusions The field of tissue engineering should consider its challenge to not only meet the autograft “gold standard” but also to understand what drives and inhibits nerve regeneration in order to surpass the results of an autograft. PMID:24385980
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lottes, S.A.; Bojanowski, C.; Shen, J.
2012-04-09
The computational fluid dynamics (CFD) and computational structural mechanics (CSM) focus areas at Argonne's Transportation Research and Analysis Computing Center (TRACC) initiated a project to support and compliment the experimental programs at the Turner-Fairbank Highway Research Center (TFHRC) with high performance computing based analysis capabilities in August 2010. The project was established with a new interagency agreement between the Department of Energy and the Department of Transportation to provide collaborative research, development, and benchmarking of advanced three-dimensional computational mechanics analysis methods to the aerodynamics and hydraulics laboratories at TFHRC for a period of five years, beginning in October 2010. Themore » analysis methods employ well-benchmarked and supported commercial computational mechanics software. Computational mechanics encompasses the areas of Computational Fluid Dynamics (CFD), Computational Wind Engineering (CWE), Computational Structural Mechanics (CSM), and Computational Multiphysics Mechanics (CMM) applied in Fluid-Structure Interaction (FSI) problems. The major areas of focus of the project are wind and water effects on bridges - superstructure, deck, cables, and substructure (including soil), primarily during storms and flood events - and the risks that these loads pose to structural failure. For flood events at bridges, another major focus of the work is assessment of the risk to bridges caused by scour of stream and riverbed material away from the foundations of a bridge. Other areas of current research include modeling of flow through culverts to improve design allowing for fish passage, modeling of the salt spray transport into bridge girders to address suitability of using weathering steel in bridges, CFD analysis of the operation of the wind tunnel in the TFHRC wind engineering laboratory. This quarterly report documents technical progress on the project tasks for the period of October through December 2011.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lottes, S.A.; Bojanowski, C.; Shen, J.
2012-06-28
The computational fluid dynamics (CFD) and computational structural mechanics (CSM) focus areas at Argonne's Transportation Research and Analysis Computing Center (TRACC) initiated a project to support and compliment the experimental programs at the Turner-Fairbank Highway Research Center (TFHRC) with high performance computing based analysis capabilities in August 2010. The project was established with a new interagency agreement between the Department of Energy and the Department of Transportation to provide collaborative research, development, and benchmarking of advanced three-dimensional computational mechanics analysis methods to the aerodynamics and hydraulics laboratories at TFHRC for a period of five years, beginning in October 2010. Themore » analysis methods employ well benchmarked and supported commercial computational mechanics software. Computational mechanics encompasses the areas of Computational Fluid Dynamics (CFD), Computational Wind Engineering (CWE), Computational Structural Mechanics (CSM), and Computational Multiphysics Mechanics (CMM) applied in Fluid-Structure Interaction (FSI) problems. The major areas of focus of the project are wind and water effects on bridges - superstructure, deck, cables, and substructure (including soil), primarily during storms and flood events - and the risks that these loads pose to structural failure. For flood events at bridges, another major focus of the work is assessment of the risk to bridges caused by scour of stream and riverbed material away from the foundations of a bridge. Other areas of current research include modeling of flow through culverts to improve design allowing for fish passage, modeling of the salt spray transport into bridge girders to address suitability of using weathering steel in bridges, CFD analysis of the operation of the wind tunnel in the TFHRC wind engineering laboratory. This quarterly report documents technical progress on the project tasks for the period of January through March 2012.« less
Design and Implementation of a New System for Large Bridge Monitoring—GeoSHM
Xie, Yilin; Ince, Sean; Ye, Jun; Bhatia, Paul
2018-01-01
Structural Health Monitoring (SHM) is a relatively new branch of civil engineering that focuses on assessing the health status of infrastructure, such as long-span bridges. Using a broad range of in-situ monitoring instruments, the purpose of the SHM is to help engineers understand the behaviour of structures, ensuring their structural integrity and the safety of the public. Under the Integrated Applications Promotion (IAP) scheme of the European Space Agency (ESA), a feasibility study (FS) project that used the Global Navigation Satellite Systems (GNSS) and Earth Observation (EO) for Structural Health Monitoring of Long-span Bridges (GeoSHM) was initiated in 2013. The GeoSHM FS Project was led by University of Nottingham and the Forth Road Bridge (Scotland, UK), which is a 2.5 km long suspension bridge across the Firth of Forth connecting Edinburgh and the Northern part of Scotland, was selected as the test structure for the GeoSHM FS project. Initial results have shown the significant potential of the GNSS and EO technologies. With these successes, the FS project was further extended to the demonstration stage, which is called the GeoSHM Demo project where two other long-span bridges in China were included as test structures. Led by UbiPOS UK Ltd. (Nottingham, UK), a Nottingham Hi-tech company, this stage focuses on addressing limitations identified during the feasibility study and developing an innovative data strategy to process, store, and interpret monitoring data. This paper will present an overview of the motivation and challenges of the GeoSHM Demo Project, a description of the software and hardware architecture and a discussion of some primary results that were obtained in the last three years. PMID:29510534
System Engineering Analysis of Topside Cranes Installed on AD, AR, and AS Class Ships
1982-02-06
4 severity CASREPs. Water or moisture in oumzs or motors accounted for five CASREPs; moisture in a transformer caused a class C fire , which resulted...Components of Bridge Cranes, Monorail Hoist Systems, and Side Port Hoists Associated Equipment: Accumulators Ladders Speed reducers Brakes Load blocks...Switches Bridge Locking devices *Tow bars Bumpers * Monorails Tracks Collector assembly Motors (electrical *Trolley buses Controller and hydraulic) *Trolleys
Optimizing Observations of Sea Ice Thickness and Snow Depth in the Arctic
2015-09-30
Region Research and Engineering Laboratory (CRREL), Naval Research Laboratory (NRL) and National Aeronautics and Space Administration ( NASA ) in...and results from this focused effort with data collected during related national and international activities (e.g. other NASA IceBridge sea ice...surface elevation of the snow or ice/air interface, and radar altimetry measurements of the snow/ice interface, taken by NASA IceBridge and NRL
13. 'Transverse Bracing for 1 208'101/2' C. to C. ...
13. 'Transverse Bracing for 1 - 208'-10-1/2' C. to C. End Pins S. Tr. Thro. Skew Span, 6th Crossing of Sacramento River, So. Pac. Co., The Phoenix Bridge Co., C.O. 836D, Drawing No. 7, Scale - 1' = 1', Engineer - B.M. Krohn, May 11th `01, Slaughter' - Southern Pacific Railroad Shasta Route, Bridge No. 301.85, Milepost 301.85, Pollard Flat, Shasta County, CA
13. 'Portal and Transverse Bracing, 1 180'01/4' c. to ...
13. 'Portal and Transverse Bracing, 1 - 180'-0-1/4' c. to c. end pins S. Tr. Thro. Truss Span, 16th Crossing Sacramento River, Sacramento Division, So. Pac. Co., The Phoenix Bridge Co., C.O. #842, Draw #6, Engineer C. Scheidl, Draftsman Hermanns, Scale 1' = 1', Apr. 26, 1901.' - Southern Pacific Railroad Shasta Route, Bridge No. 324.99, Milepost 324.99, Shasta Springs, Siskiyou County, CA
Use of Laser Scanning Technology to Obtain As-Built Records of Historic Covered Bridges
Robert J. Ross; Brian K. Brashaw; Samuel J. Anderson
2012-01-01
Covered bridges are part of the fabric of American history. Although much effort is expended to preserve these structures, many are lost forever. The National Park Serviceâs Historic American Engineering Record (HAER) has efforts under way to document historic structures. Their Level I documentation is defined in the Secretary of the Interiorâs Standards and Guidelines...
Detail of plaque beneath column on the south parapet at ...
Detail of plaque beneath column on the south parapet at the west end of the bridge. The plaque reads 1914; Mayor E.J. Drussel; Councilmen E.S. Henry, E.F. Hogan, R.P. Lamdin, C.F. Ross, J.H. Shuppert; Leonard & Day, Engineers; C.H. Gildersleeve, Builder. - First Street Bridge, Spanning Napa River at First Street between Soscol Avenue & Juarez Street, Napa, Napa County, CA
Project-Based Learning to Enhance Teaching Embedded Systems
ERIC Educational Resources Information Center
Sababha, Belal H.; Alqudah, Yazan A.; Abualbasal, Abdelraheem; AlQaralleh, Esam A.
2016-01-01
Exposing engineering students during their education to real-world problems and giving them the chance to apply what they learn in the classroom is a vital element of engineering education. The Embedded Systems course at Princess Sumaya University for Technology (PSUT) is one of the main courses that bridge the gap between theoretical electrical…
A Modular Approach to Integrating Biofuels Education into ChE Curriculum Part I--Learning Materials
ERIC Educational Resources Information Center
He, Q. Peter; Wang, Jin; Zhang, Rong; Johnson, Donald; Knight, Andrew; Polala, Ravali
2016-01-01
In view of potential demand for skilled engineers and competent researchers in the biofuels field, we have identified a significant gap between advanced biofuels research and undergraduate biofuels education in chemical engineering. To help bridge this gap, we created educational materials that systematically integrate biofuels technologies into…
State Analysis: A Control Architecture View of Systems Engineering
NASA Technical Reports Server (NTRS)
Rasmussen, Robert D.
2005-01-01
A viewgraph presentation on the state analysis process is shown. The topics include: 1) Issues with growing complexity; 2) Limits of common practice; 3) Exploiting a control point of view; 4) A glimpse at the State Analysis process; 5) Synergy with model-based systems engineering; and 6) Bridging the systems to software gap.
Summer Study in Engineering for High School Women.
ERIC Educational Resources Information Center
Goldberg, Julie L.; Sedlacek, William E.
The transition between high school and college is a crucial point where many young women engaged in the applied sciences and engineering cease their participation. To help retain young women's interest and help bridge the gap between secondary school and higher education, The University of Maryland, College Park, held a six-week live-in academic…
Implementing Problem Based Learning through Engineers without Borders Student Projects
ERIC Educational Resources Information Center
Wittig, Ann
2013-01-01
Engineers Without Borders USA (EWB) is a nonprofit organization that partners student chapters with communities in fundamental need of potable water, clean air, sanitation, irrigation, energy, basic structures for schools and clinics, roads and bridges, etc. While EWB projects may vary in complexity, they are all realistic, ill-structured and…
USDA-ARS?s Scientific Manuscript database
Feral populations of cultivated crops have the potential to function as bridges and reservoirs that contribute to the unwanted movement of novel genetically engineered (GE) traits. Recognizing that feral alfalfa has the potential to lower genetic purity in alfalfa seed production fields when it is g...
Study on energy consumption evaluation of mountainous highway based on LCA
NASA Astrophysics Data System (ADS)
Fei, Lunlin; Zhang, Qi; Xie, Yongqing
2017-06-01
For the system to understand the road construction energy consumption process, this paper selects a typical mountainous highway in the south, using the theory and method of Life Cycle Assessment (LCA) to quantitatively study the energy consumption of the whole process of highway raw materials production, construction and operation. The results show that the energy consumption in the raw material production stage is the highest, followed by the highway operation and construction stage. The energy consumption per unit of tunnel engineering, bridge engineering, roadbed engineering and pavement engineering in the construction phase are 2279.00 tce, 1718.07 tce, 542.19 tce and 34.02 tce, and in operational phase, 85.44% of electricity consumption comes from tunnel ventilation and lighting. Therefore, in the bridge and tunnel construction process, we should promote energy-saving innovation of the construction technology and mechanical equipment, and further strengthen the research and development of tunnel ventilation, lighting energy-saving equipment and intelligent control technology, which will help significantly reduce the energy consumption and greenhouse gas emissions of the life cycle of highway.
Establishment of Kansei Database and Application to Design for Consensus Building
NASA Astrophysics Data System (ADS)
Yasuda, Keiichi; Shiraki, Wataru
Reflecting the recent social background where the importance of bridge landscape design is recognized and the new business style of citizen-involved infrastructure development has started, there has been a growing need of design where aesthetic feeling of actual users is reflected. In this research, a focus has been placed on the Kansei engineering technique where users' needs are reflected on product development. A questionnaire survey has been conducted for bridge engineers who are most intensively involved in design work and students as actual users. The result was analyzed by factor analysis and the Hayashi's quantification methods (category I). A tool required at consensus-building occasions has been created to change design elements and display accompanying evaluation difference while using the Kansei database.
The Study of Nationalism. A Bibliographic Essay on the Literature Published in the English Language,
1975-01-01
accommodating sovereignty and the regional integration of Europe. (9) Jeremy Haritos, Nationalism and European Inteeration A Study of - 56 - French... Bentham van den Bergh, "Contemporary Nationalism in the Western World" in Stanley Hoffman (pd.), Conditions of World Order (New York: Simon and
Integrated Non-kinetic Operations: The Frontier of Warfare in Search of Doctrine
2010-06-01
on Earth. John Guare, Six Degrees of Separation, stage play (New York, N.Y.: Dramatists Play Service, Inc., 1990) premiered Mitzi E. Newhouse...Stage play. New York, N.Y.: Dramatists Play Service, Inc., 1990. Premiered Mitzi E. Newhouse Theater, New York City, NY, 16 May 1990. Hoffman
Criticism and the Teaching of Literature.
ERIC Educational Resources Information Center
Miller, James E., Jr., Ed.
1965-01-01
Articles contained in this publication are (1) "Criticism in Teaching Literature" by Wayne Booth; (2) "Criticism and Literature: A Reply" (to Booth's article) by Frederick J. Hoffman; (3) "Criticism in Context" by Helen C. White; (4) "Formalist Criticism and Shakespeare" by Kester Svendsen; (5) "Grammar, History, and Criticism" by Kenneth S.…
The interface theory of perception: the future of the science of the mind?
Hickok, Gregory
2015-12-01
Perception is typically conceptualized as a neurocognitive system that evolved to reveal the truth about objects and events in the world. Hoffman et al.'s Interface Theory of Perception questions this assumption. If true, the implications for the science of the mind are profound.
Vice President Pence Tours Jet Propulsion Laboratory
2018-04-28
U.S. Vice President Mike Pence, 3rd from left, his wife Karen, and their daughter Charlotte meet with JPL Director Michael Watkins, and Mars Curiosity Mission ACE Walt Hoffman, right, during a tour of NASA's Jet Propulsion Laboratory, Saturday, April 28, 2018 in Pasadena, California. Photo Credit: (NASA/Bill Ingalls)
Forecasting Fuels Support Equipment Requisitions
2015-03-26
Blackstone , & Hoffmann, 1991). Problem Statement Which forecasting method is most appropriate to forecast fuels support equipment requisitions...over allocating financial resources. 14 Characteristics According to Fogarty, Blackstone , and Hoffman (1991), service, repair, replacement...Econometrica , 187-222. Fogarty, D., Blackstone , J., & Hoffmann, T. (1991). Production & Inventory Management (2d ed.). Cincinnati, OH: South-Western
ERIC Educational Resources Information Center
Zorn, Theodore E.
1991-01-01
Discusses how the movie "Death of a Salesman" (a 1986 movie starring Dustin Hoffman in the role of Willy Loman) is useful for teaching communication concepts. Examines how the movie provides a rich case study for illustrating the negotiation of identities. (KEH)