CLOSEUP VIEW OF A GENERATOR UNIT WITH ITS ASSOCIATED INSTRUMENTATION ...
CLOSE-UP VIEW OF A GENERATOR UNIT WITH ITS ASSOCIATED INSTRUMENTATION AND CONTROL PANEL. - Wilson Dam & Hydroelectric Plant, Turbine & Generator Unit, Spanning Tennessee River at Wilson Dam Road (Route 133), Muscle Shoals, Colbert County, AL
Regulatory Approaches for Adding Capacity to Existing Hydropower Facilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Levine, Aaron L.; Curtis, Taylor L.; Kazerooni, Borna
In 2015, hydroelectric generation accounted for more than 6 percent of total net electricity generation in the United States and 46 percent of electricity generation from all renewables. The United States has considerable hydroelectric potential beyond what is already being developed. Nearly 7 GW of this potential is found by adding capacity to existing hydropower facilities. To optimize the value of hydroelectric generation, the U.S. Department of Energy's Hydropower Vision Study highlights the importance of adding capacity to existing facilities. This report provides strategic approaches and considerations for Federal Energy Regulatory Commission licensed and exempt hydropower facilities seeking to increasemore » generation capacity, which may include increases from efficiency upgrades. The regulatory approaches reviewed for this report include capacity and non-capacity amendments, adding capacity during relicensing, and adding capacity when converting a license to a 10-MW exemption.« less
Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jack Q. Richardson
2012-06-28
Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project costmore » match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.« less
Study on safety operation for large hydroelectric generator unit
NASA Astrophysics Data System (ADS)
Yan, Z. G.; Cui, T.; Zhou, L. J.; Zhi, F. L.; Wang, Z. W.
2012-11-01
Hydroelectric generator unit is a complex mechanical system which is composed of hydraulic turbine and electric generator. Rotary system is supported by the bearing bracket and the reinforced concrete structures, and vibration problem can't be avoided in the process of operating. Many large-scale hydroelectric units have been damaged because of the vibration problem in recent years. As the increase of the hydraulic turbine unit capacity and water head, the safe operation of hydraulic turbine has become a focus research in many countries. The operating characteristics of the hydraulic turbine have obvious differences at different working conditions. Based on the combination of field measurement and theoretical calculation, this paper shows a deep research on the safe operation of a large-scale Francis turbine unit. Firstly, the measurements of vibration, swing, pressure fluctuation and noise were carried out at 4 different heads. And also the relationships between vibrations and pressure fluctuations at different heads and working conditions were analysed deeply. Then the scientific prediction of safe operation for the unit at high head were done based on the CFD numerical calculation. Finally, this paper shows the division of the operating zone for the hydroelectric unit. According to the experimental results (vibrations, swings, pressure fluctuations and noise) as well as the theoretical results, the operating zone of the unit has been divided into three sections: prohibited operating zone, transition operating zone and safe operating zone. After this research was applied in the hydropower station, the security and economic efficiency of unit increased greatly, and enormous economic benefits and social benefits have been obtained.
4. INTERIOR OF POWERHOUSE GENERATOR ROOM SHOWING GENERATOR UNITS AT ...
4. INTERIOR OF POWERHOUSE GENERATOR ROOM SHOWING GENERATOR UNITS AT FOREGROUND RIGHT, GOVERNORS AND CONTROL VALVES AT LEFT, AND EXCITERS AT BACK LEFT. VIEW TO NORTH. - Rush Creek Hydroelectric System, Powerhouse Exciters, Rush Creek, June Lake, Mono County, CA
NASA Astrophysics Data System (ADS)
Ehsani, N.; Vorosmarty, C. J.; Fekete, B. M.
2016-12-01
We are using a large-scale, high-resolution, fully integrated hydrological/reservoir/hydroelectricity model to investigate the impact of climate change on the operation of 11037 dams and generation of electricity from 375 hydroelectric power plants in the Northeastern United States. Moreover, we estimate the hydropower potential of the region by energizing the existing non-powered dams and then studying the impact of climate change on the hydropower potential. We show that climate change increases the impact of dams on the hydrology of the region. Warmer temperatures produce shorter frozen periods, earlier snowmelt and elevated evapotranspiration rates, which when combined with changes in precipitation, are projected to increase water availability in winter but reduce it during summer. As a result, the water that is stored by dams will be more than ever a necessary part of the routine water systems operations to compensate for these seasonal imbalances. The function of dams as emergency water storage for creating drought resiliency will mostly diminish in the future. Building more dams to cope with the local impacts of climate change on water resources and to offset the increased drought vulnerability may thus be inevitable. Annual hydroelectricity generation in the region is 41 Twh. Our estimate of the annual hydropower potential of non-powered dams adds up to 350 Twh. Climate change may reduce hydropower potential from non-powered dams by up to 13% and reduce current hydroelectricity generation by up to 8% annually. Hydroelectricity generation and hydropower potential may increase in winter months and decline in months of summer and fall. These changes call for recalibration of dam operations and may raise conflict of interests in multipurpose dams.
5. POWERHOUSE, PELTONFRANCIS TURBINES (GENERATORS) UNITS NOS. 1 AND 2 ...
5. POWERHOUSE, PELTON-FRANCIS TURBINES (GENERATORS) UNITS NOS. 1 AND 2 WITH REGULATOR PANEL AT LEFT AND GATE VALVE IN CENTER FOREGROUND - Yosemite Hydroelectric Power Plant, Highways 120 & 140, Yosemite Village, Mariposa County, CA
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-18
... reservoir inlet/outlet and the reversible turbine/generator units in the powerhouse; (3) an underground powerhouse containing four reversible turbine/generator units rated for 250 megawatts (MW) each, for a total... four 250-MW reversible turbine/ generator units; (4) a 2-mile-long, 500-kilovolt (kV) transmission line...
16. LIGHTING PLAN OF GENERATOR ROOM, SHOWING CONFIGURATION OF TURBINEGENERATOR ...
16. LIGHTING PLAN OF GENERATOR ROOM, SHOWING CONFIGURATION OF TURBINE-GENERATOR UNITS. UNITS A THROUGH D ARE CURRENTLY DESIGNATED AS NOS. 1 THROUGH 4 (1907) - Nine Mile Hydroelectric Development, Powerhouse, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA
1981-07-01
expanding the powerhouse) or uprating existing units to higher generating capacity by rehabilitating, modifying or replacing turbines and/or...fluid energy loss in flow passage and energy loss in converting fluid energy (flow and head) to mechanical energy ( turbine output) to electrical...energy (generator output). The significant practical opportunity is improvement of the energy conversion efficiency of the hydraulic turbine since the
58. Photocopy of photograph, no date. VIEW OF GENERATOR UNIT ...
58. Photocopy of photograph, no date. VIEW OF GENERATOR UNIT 2. (Courtesy of the Potomac Edison Company Library (Hagerstown, MD), Historical Data Files, Properties-Buildings and Equipment listing) - Dam No. 5 Hydroelectric Plant, On Potomac River, Hedgesville, Berkeley County, WV
19. DETAIL OF TURBINEGENERATOR UNIT #5, INSTALLED IN 1905; UNLIKE ...
19. DETAIL OF TURBINE-GENERATOR UNIT #5, INSTALLED IN 1905; UNLIKE UNITS #1 THROUGH #4, UNIT #5 CONTAINS A FRANCIS TURBINE; THIS TURBINE WAS MANUFACTURED BY THE PLATT IRON WORKS OF DAYTON, OHIO; THE GENERATOR IS RATED AT 5,000 KW - Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA
57. Photocopy of photograph, c. 1946. DETAIL OF GENERATOR UNIT ...
57. Photocopy of photograph, c. 1946. DETAIL OF GENERATOR UNIT 2, GOVERNOR, AND SWITCHBOARD. (Courtesy of the Potomac Edison Company Library (Hagerstown, MD), Historical Data Files, Dam No. 5 listing) - Dam No. 5 Hydroelectric Plant, On Potomac River, Hedgesville, Berkeley County, WV
State Models to Incentivize and Streamline Small Hydropower Development
DOE Office of Scientific and Technical Information (OSTI.GOV)
Curtis, Taylor; Levine, Aaron; Johnson, Kurt
In 2016, the hydropower fleet in the United States produced more than 6 percent (approximately 265,829 gigawatt-hours [GWh]) of the total net electricity generation. The median-size hydroelectric facility in the United States is 1.6 MW and 75 percent of total facilities have a nameplate capacity of 10 MW or less. Moreover, the U.S. Department of Energy's Hydropower Vision study identified approximately 79 GW hydroelectric potential beyond what is already developed. Much of the potential identified is at low-impact new stream-reaches, existing conduits, and non-powered dams with a median project size of 10 MW or less. To optimize the potential andmore » value of small hydropower development, state governments are crafting policies that provide financial assistance and expedite state and federal review processes for small hydroelectric projects. This report analyzes state-led initiatives and programs that incentivize and streamline small hydroelectric development.« less
VIEW FROM THE GENERATOR FLOOR LOOKING DOWN AT THE SPIRAL ...
VIEW FROM THE GENERATOR FLOOR LOOKING DOWN AT THE SPIRAL DISTRIBUTOR AND DRAFT CONE. - Wilson Dam & Hydroelectric Plant, Turbine & Generator Unit, Spanning Tennessee River at Wilson Dam Road (Route 133), Muscle Shoals, Colbert County, AL
VIEW FROM DRAFT TUBE LOOKING UP TOWARDS THE GENERATOR FLOOR, ...
VIEW FROM DRAFT TUBE LOOKING UP TOWARDS THE GENERATOR FLOOR, DRAFT CONE IN FOREGROUND. - Wilson Dam & Hydroelectric Plant, Turbine & Generator Unit, Spanning Tennessee River at Wilson Dam Road (Route 133), Muscle Shoals, Colbert County, AL
8. Generator Barrel and Shaft of Unit 1, view to ...
8. Generator Barrel and Shaft of Unit 1, view to the northwest, with turbine shaft and thrust bearing visible in upper center of photograph. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT
26. Generator Voltage Regulator Cabinet Exterior for Unit 1, view ...
26. Generator Voltage Regulator Cabinet Exterior for Unit 1, view to the northwest. The exciter supplies the DC current to the generator rotor to create electricity. Each of the four original units has an exciter identical to this one, and all are scheduled for replacement. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT
Climate change impacts on high-elevation hydroelectricity in California
NASA Astrophysics Data System (ADS)
Madani, Kaveh; Guégan, Marion; Uvo, Cintia B.
2014-03-01
While only about 30% of California's usable water storage capacity lies at higher elevations, high-elevation (above 300 m) hydropower units generate, on average, 74% of California's in-state hydroelectricity. In general, high-elevation plants have small man-made reservoirs and rely mainly on snowpack. Their low built-in storage capacity is a concern with regard to climate warming. Snowmelt is expected to shift to earlier in the year, and the system may not be able to store sufficient water for release in high-demand periods. Previous studies have explored the climate warming effects on California's high-elevation hydropower by focusing on the supply side (exploring the effects of hydrological changes on generation and revenues) ignoring the warming effects on hydroelectricity demand and pricing. This study extends the previous work by simultaneous consideration of climate change effects on high-elevation hydropower supply and pricing in California. The California's Energy-Based Hydropower Optimization Model (EBHOM 2.0) is applied to evaluate the adaptability of California's high-elevation hydropower system to climate warming, considering the warming effects on hydroelectricity supply and pricing. The model's results relative to energy generation, energy spills, reservoir energy storage, and average shadow prices of energy generation and storage capacity expansion are examined and discussed. These results are compared with previous studies to emphasize the need to consider climate change effects on hydroelectricity demand and pricing when exploring the effects of climate change on hydropower operations.
28. Credit JTL. Overview of unit 5 (installed 1908) showing ...
28. Credit JTL. Overview of unit 5 (installed 1908) showing exciter, generator, deflector motor, needle valve control, impulse wheel housing, and gate valve controls. - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA
13. VIEW OF PELTON WHEELS AND GENERATORS IN CAVITY PLANT, ...
13. VIEW OF PELTON WHEELS AND GENERATORS IN CAVITY PLANT, AS SEEN FROM PELTON WHEEL-GENERATOR UNIT #1; GENERATOR #1, #2, #3, #4 WERE MANUFACTURED BY WESTINGHOUSE, EACH RATED AT 1,500 KW - Snoqualmie Falls Hydroelectric Project, .5 mile north of Snoqualmie, Snoqualmie, King County, WA
121. View of water filters, water from which is used ...
121. View of water filters, water from which is used to cool bearings of turbine-generator units in Generator Room above; looking north. This water filter is for turbine-generator unit no. 1, and is located in the subway. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA
112. Detail of butterfly valve for turbine unit no. 2. ...
112. Detail of butterfly valve for turbine unit no. 2. Beyond is a General Electric AC generator directly connected to turbine unit no. 2. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA
47. INTERIOR UNDER CONSTRUCTION, SHOWING EXCITERS AND BASES FOR GENERATOR ...
47. INTERIOR UNDER CONSTRUCTION, SHOWING EXCITERS AND BASES FOR GENERATOR UNITS. EEC print no. N-C-01-00033, no date. Photograph by Benjamin F. Pearson. - Santa Ana River Hydroelectric System, SAR-1 Powerhouse, Redlands, San Bernardino County, CA
NASA Astrophysics Data System (ADS)
Béguin, A.; Nicolet, C.; Hell, J.; Moreira, C.
2017-04-01
The paper explores the improvement in ancillary services that variable speed technologies can provide for the case of an existing pumped storage power plant of 2x210 MVA which conversion from fixed speed to variable speed is investigated with a focus on the power step performances of the units. First two motor-generator variable speed technologies are introduced, namely the Doubly Fed Induction Machine (DFIM) and the Full Scale Frequency Converter (FSFC). Then a detailed numerical simulation model of the investigated power plant used to simulate power steps response and comprising the waterways, the pump-turbine unit, the motor-generator, the grid connection and the control systems is presented. Hydroelectric system time domain simulations are performed in order to determine the shortest response time achievable, taking into account the constraints from the maximum penstock pressure and from the rotational speed limits. It is shown that the maximum instantaneous power step response up and down depends on the hydro-mechanical characteristics of the pump-turbine unit and of the motor-generator speed limits. As a results, for the investigated test case, the FSFC solution offer the best power step response performances.
Potential for Increasing the Output of Existing Hydroelectric Plants.
1981-06-01
existing units to higher generating capacity by rehabilitating, modifying or replacing turbines and/or generators; increasing the effective...loss in converting fluid energy (flow and head) to mechanical energy ( turbine output) to electrical energy (generator output). The significant practical...opportunity is improvement of the energy conversion efficiency of the hydraulic turbine since the energy conversion efficiency of electrical
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-14
... maximum hydraulic capacity of 331 cubic feet per second (cfs), to two generating units with a total installed capacity of 321 kW and a maximum hydraulic capacity of 333 cfs. The two units are: One existing unit rated at 225 kW with a maximum hydraulic capacity of 233 cfs and one proposed unit to be installed...
122. View in subway showing air filters for unit turbinegenerator ...
122. View in subway showing air filters for unit turbine-generator unit no. 3; looking north. To the left is opening through wall which brings fresh air into the filters; this opening is above the tailrace. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA
7. Unit 3 Service Water System Valves, view to the ...
7. Unit 3 Service Water System Valves, view to the east. These pipes and valves supply water from the draft chest for cooling the generator barrels. - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID
Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Taddeucci, Joe
2013-03-29
The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Betweenmore » 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a double nozzle Pelton turbine with a 10-to-1 flow turndown and a maximum turbine/generator efficiency of 88%. This alone represents a 6% increase in overall efficiency. The old turbine operated at low efficiencies due to age and non-optimal sizing of the turbine for the water flow available to the unit. It was shut down whenever water flow dropped to less than 4-5 cfs, and at that flow, efficiency was 55 to 60%. The new turbine will operate in the range of 70 to 88% efficiency through a large portion of the existing flow range and would only have to be shut down at flow rates less than 3.7 cfs. Efficiency is expected to increase by 15-30%, depending on flow. In addition to the installation of new equipment, other goals for the project included: Increasing safety at Boulder Canyon Hydro Increasing protection of the Boulder Creek environment Modernizing and integrating control equipment into Boulder's municipal water supply system, and Preserving significant historical engineering information prior to power plant modernization. From January 1, 2010 through December 31, 2012, combined consultant and contractor personnel hours paid for by both the city and the federal government have totaled approximately 40,000. This equates roughly to seven people working full time on the project from January 2010 through December 2012. This project also involved considerable material expense (steel pipe, a variety of valves, electrical equipment, and the various components of the turbine and generator), which were not accounted for in terms of hours spent on the project. However, the material expense related to this project did help to create or preserve manufacturing/industrial jobs throughout the United States. As required by ARRA, the various components of the hydroelectric project were manufactured or substantially transformed in the U.S. BCH is eligible for nomination to the National Register of Historic Places due in part to its unique engineering features and innovative construction techniques. Special efforts were directed toward documenting the (largely original) interior of the plant and installing new equipment without modifying the power plant exterior in order to preserve the historical significance of the facility. In addition, a significant portion of the historical equipment within the power plant was preserved in place. The modernization project began with DOE grant award on January 1, 2010, and the project was completed on December 31, 2012. In addition to city engineering and hydroelectric staff, major project participants included AECOM (design/engineering) Canyon Industries (turbine/generator manufacture), Gracon Corporation (general construction contractor), Exponential Engineering Company (electrical engineering) and URS Corporation (historical documentation), as well as numerous other subcontractors and consultants.« less
Grid-connected in-stream hydroelectric generation based on the doubly fed induction machine
NASA Astrophysics Data System (ADS)
Lenberg, Timothy J.
Within the United States, there is a growing demand for new environmentally friendly power generation. This has led to a surge in wind turbine development. Unfortunately, wind is not a stable prime mover, but water is. Why not apply the advances made for wind to in-stream hydroelectric generation? One important advancement is the creation of the Doubly Fed Induction Machine (DFIM). This thesis covers the application of a gearless DFIM topology for hydrokinetic generation. After providing background, this thesis presents many of the options available for the mechanical portion of the design. A mechanical turbine is then specified. Next, a method is presented for designing a DFIM including the actual design for this application. In Chapter 4, a simulation model of the system is presented, complete with a control system that maximizes power generation based on water speed. This section then goes on to present simulation results demonstrating proper operation.
Hydroelectric System Response to Part Load Vortex Rope Excitation
NASA Astrophysics Data System (ADS)
Alligné, S.; Nicolet, C.; Bégum, A.; Landry, C.; Gomes, J.; Avellan, F.
2016-11-01
The prediction of pressure and output power fluctuations amplitudes on Francis turbine prototype is a challenge for hydro-equipment industry since it is subjected to guarantees to ensure smooth and reliable operation of the hydro units. The European FP7 research project Hyperbole aims to setup a methodology to transpose the pressure fluctuations induced by the cavitation vortex rope on the reduced scale model to the prototype generating units. A Francis turbine unit of 444MW with a specific speed value of v = 0.29, is considered as case study. A SIMSEN model of the power station including electrical system, controllers, rotating train and hydraulic system with transposed draft tube excitation sources is setup. Based on this model, a frequency analysis of the hydroelectric system is performed to analyse potential interactions between hydraulic excitation sources and electrical components.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-19
... On August 3, 2011, Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility (Trust No. 1... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4784-082] Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro Partners Limited Partnership...
18. Credit Pelton Water Wheel Company. View from the older ...
18. Credit Pelton Water Wheel Company. View from the older portion of the powerhouse with the 750 kW 1901 generating units in the left foreground. An exciter unit and the switchboard are in the right foreground. (Pelton Water Wheel Company, Pelton Impulse & Reaction Turbine Installations, 1920, p. 33). - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA
2. VIEW EAST ALONG DIKE TOWARDS HYDROELECTRIC GENERATING FACILITY. FORMER ...
2. VIEW EAST ALONG DIKE TOWARDS HYDROELECTRIC GENERATING FACILITY. FORMER TRANSFORMER BUILDING AND SERVICE SHED SEEN TO LEFT BELOW DIKE - Middle Creek Hydroelectric Dam, On Middle Creek, West of U.S. Route 15, 3 miles South of Selinsgrove, Selinsgrove, Snyder County, PA
Burning--Gravitational, Chemical, and Nuclear.
ERIC Educational Resources Information Center
Jones, Goronwy Tudor
1991-01-01
Energy problems that incorporate power generation in hydroelectric, fossil-fuel burning, and nuclear power stations are presented. The burning process and the energy released are discussed. Practice problems and solutions, a summary of various energy units and conversion factors, and lists of thought-provoking energies and powers are included. (KR)
22. DETAIL TO NORTHWEST OF LUBRICATING OIL TANKS AND FILTERS ...
22. DETAIL TO NORTHWEST OF LUBRICATING OIL TANKS AND FILTERS FOR UNITS 1-4 (CENTER), AND UNIT 3 GOVERNOR (RIGHT CENTER FOREGROUND) AND GATE VALVE (RIGHT CENTER BACKGROUND) CONTROLS, OLD POWERHOUSE GENERATOR FLOOR - Trenton Falls Hydroelectric Station, Powerhouse & Substation, On west bank of West Canada Creek, along Trenton Falls Road, 1.25 miles north of New York Route 28, Trenton Falls, Oneida County, NY
DOE Office of Scientific and Technical Information (OSTI.GOV)
Will, Alan L.
1979-04-01
The redevelopment of the hydroelectric facility at Brighton Dam near Laurel, Maryland has been found to be both technically and financially feasible, the benefit to cost ratio being 1.53:1 compared with an equivalent coal-based generation source. Environmental impacts have been assessed as relatively slight, but some problems, due to poor water quality at the bottom of the reservoir are anticipated and solutions for these would have to be worked out. The benefit to cost ratio could thus be marginally decreased, but the relative costs of one alternative scheme compared to another would not be affected. There is no apparent impedimentmore » to proceeding with the work. The selected development would have a single hydroelectric generating unit of 500 kW rated capacity. The gross generation from the project would be 2,840,000 kWh in the year with average rainfall. It is estimated that the total project cost would be $734,000 (at third quarter 1978 price levels), with no allowance for funds during construction (AFDC). Based on 6.25% cost of money, the project would provide power at a levelized cost over the plant lifetime of approximately 23.3 mills per kWh with no AFDC or 24.6 mills/kWh with AFDC. At present, WSSC electrical power demands at Brighton Dam amount to 147,000 kWh per year which is met by Baltimore Gas and Electric Company (BG and E). This represents only 5% of the potential generation at the site and BG and E have agreed in principal to purchase the surplus power.« less
Lorenzon, Alexandre Simões; Ribeiro, Carlos Antonio Alvares Soares; Dos Santos, Alexandre Rosa; de Castro, Nero Lemos Martins; Marcatti, Gustavo Eduardo; Domingues, Getulio Fonseca; Teixeira, Thaisa Ribeiro; Silva, Elias; Soares, Vicente Paulo; Menezes, Sady Júnior Martins da Costa de; de Almeida Telles, Lucas Arthur; Mota, Pedro Henrique Santos
2018-07-01
Over the past few years, many sectors such as energy generation, industry, domestic supply, and agriculture have encountered serious environmental problems due to the lack of rainfall. Thus, the purpose of this paper is to review the current methodology of royalties distribution from Itaipu hydroelectric plant. In the proposed approach, two criteria were considered to establish the division of Itaipu royalties: (1) the relative percentage of the water flow in the generation of electricity and, (2) the relative percentage of the drop in the height of water. 62 hydroelectric plants were evaluated in this study. In 52 plants the water flow was the factor that most contributed to the generation of electricity. In 2013, 346 municipalities benefited the Itaipu royalties. With the proposed methodology, 1,327 municipalities will receive the resource, what would increase the revenue of each of these municipalities by, on average, US$ 87,436.91 per year. The methodology presented herein proposes a reduction in the environmental disparity that now exists in Brazil, through improvement to Government instruments and environmental policies. The distribution of royalties throughout the watershed can provide additional resources to support payment programs for environmental services at the state and municipality levels. Copyright © 2018 Elsevier Ltd. All rights reserved.
Artificial Bee Colony Optimization for Short-Term Hydrothermal Scheduling
NASA Astrophysics Data System (ADS)
Basu, M.
2014-12-01
Artificial bee colony optimization is applied to determine the optimal hourly schedule of power generation in a hydrothermal system. Artificial bee colony optimization is a swarm-based algorithm inspired by the food foraging behavior of honey bees. The algorithm is tested on a multi-reservoir cascaded hydroelectric system having prohibited operating zones and thermal units with valve point loading. The ramp-rate limits of thermal generators are taken into consideration. The transmission losses are also accounted for through the use of loss coefficients. The algorithm is tested on two hydrothermal multi-reservoir cascaded hydroelectric test systems. The results of the proposed approach are compared with those of differential evolution, evolutionary programming and particle swarm optimization. From numerical results, it is found that the proposed artificial bee colony optimization based approach is able to provide better solution.
Butterman, W.C.; McCartan, L.; Morse, D.E.; Sibley, S.F.
1999-01-01
The US coal industry had a good year in 1998, setting another production record of 1.015 Gt (1.12 billion st), an increase of 2.6% from 1997. The increase was led by coal use for electricity generation, responding primarily to a substantial decline in hydroelectric generation. Year-end coal stocks at electric utilities swelled in 1998 for the first time in four years due to unseasonably mild fall and winter weather.
3. INTERIOR OF POWERHOUSE BUILDING SHOWING EXCITER No. 2 (FOREGROUND), ...
3. INTERIOR OF POWERHOUSE BUILDING SHOWING EXCITER No. 2 (FOREGROUND), EXCITER No. 1, AND GENERATOR UNIT No. 2. BAYS FOR TRANSFORMERS No. 1 AND 2 ARE VISIBLE ALONG SIDE-WALL IN BACKGROUND. VIEW TO SOUTHWEST. - Kern County No. 1 Hydroelectric System, Powerhouse Exciters, Kern River Canyon, Bakersfield, Kern County, CA
Electric plant cost and power production expenses 1989. [Glossary included
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-03-29
This publication presents electric utility statistics on power production expenses and construction costs of electric generating plants. Data presented here are intended to provide information to the electric utility industry, educational institutions, federal, state, and local governments, and the general public. This report primarily presents aggregate operation, maintenance, and fuel expense data about all power plants owned and operated by the major investor-owned electric utilities in the United States. The power production expenses for the major investor-owned electric utilities are summarized. Plant-specific data are presented for a selection of both investor-owned and publicly owned plants. Summary statistics for each plantmore » type (prime mover), as reported by the electric utilities, are presented in the separate chapters as follows: Hydroelectric Plants; Fossil-Fueled Steam-Electric Plants; Nuclear Steam-Electric Plants; and Gas Turbine and Small Scale Electric Plants. These chapters contain plant level data for 50 conventional hydroelectric plants and 22 pumped storage hydroelectric plants, 50 fossil-fueled steam-electric plants, 71 nuclear steam-electric plants, and 50 gas turbine electric plants. Among the operating characteristics of each plant are the capacity, capability, generation and demand on the plant. Physical characteristics comprise the number of units in the plant, the average number of employees, and other information relative to the plant's operation. The Glossary section will enable the reader to understand clearly the terms used in this report. 4 figs., 18 tabs.« less
126. View in Generator Room of exciter unit no. 1; ...
126. View in Generator Room of exciter unit no. 1; looking northwest. This unit includes a Pelton wheel manufactured by Allis Chalmers, no. 261, type C-1, Breaking Horse Power 600, head 370 feet, and 360 rpm; a General Electric DC generator, no. 1357609, type MPC 8, 340-350 form LD, 1360 amp, 350 rpm, 250 volts (no load), 250 volts (full load); and a General Electric induction motor, no. 4228863, type KT-4424, 20-500-360 form A, 60 cycles, 45 amp, 6,600 volts, 500 horsepower, continuous 50-degree centigrade rise, 350 rpm with full-load. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA
45. 800 H.P. WATER WHEEL UNIT (LEFT HAND) DIRECT CONNECTED ...
45. 800 H.P. WATER WHEEL UNIT (LEFT HAND) DIRECT CONNECTED TO A 500 K.W. G.E. CO. GENERATOR, SPEED 176 R.P.M., HEAD OF WATER 305 FT EFF., FOR SANTA ANA RIVER NO. 2 PLANT. ABNER DOBLE CO., ENGINEERS, SAN FRANCISCO, AUG. 29, 1904. TRACED FROM DOBLE BLUE PRINT, SEPT. 9, 1911. SCE drawing no. 5698. - Santa Ana River Hydroelectric System, SAR-2 Powerhouse, Redlands, San Bernardino County, CA
American Recovery and Reinvestment Act: North Fork Skokomish Powerhouse at Cushman No. 2 Dam
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fischer, Steve; McCarty, Patrick
2013-09-30
The objective of this project was to add generating capacity on an in-stream flow release at Tacoma Power's Cushman hydroelectric project, Cushman No. 2 Dam, FERC Project P-460. The flow that is being used to generate additional electricity was being discharged from a valve at the base of the dam without recovery of the energy. A second objective to the project was to incorporate upstream fish passage by use of a fish collection structure attached to the draft tubes of the hydroelectric units. This will enable reintroduction of native anadromous fish above the dams which have blocked fish passage sincemore » the late 1920's. The project was funded in part by the American Recovery and Reinvestment Act through the Department of Energy, Office of Energy, Efficiency and Renewable Energy, Wind and Water Power Program.« less
A model for the data extrapolation of greenhouse gas emissions in the Brazilian hydroelectric system
NASA Astrophysics Data System (ADS)
Pinguelli Rosa, Luiz; Aurélio dos Santos, Marco; Gesteira, Claudio; Elias Xavier, Adilson
2016-06-01
Hydropower reservoirs are artificial water systems and comprise a small proportion of the Earth’s continental territory. However, they play an important role in the aquatic biogeochemistry and may affect the environment negatively. Since the 90s, as a result of research on organic matter decay in manmade flooded areas, some reports have associated greenhouse gas emissions with dam construction. Pioneering work carried out in the early period challenged the view that hydroelectric plants generate completely clean energy. Those estimates suggested that GHG emissions into the atmosphere from some hydroelectric dams may be significant when measured per unit of energy generated and should be compared to GHG emissions from fossil fuels used for power generation. The contribution to global warming of greenhouse gases emitted by hydropower reservoirs is currently the subject of various international discussions and debates. One of the most controversial issues is the extrapolation of data from different sites. In this study, the extrapolation from a site sample where measurements were made to the complete set of 251 reservoirs in Brazil, comprising a total flooded area of 32 485 square kilometers, was derived from the theory of self-organized criticality. We employed a power law for its statistical representation. The present article reviews the data generated at that time in order to demonstrate how, with the help of mathematical tools, we can extrapolate values from one reservoir to another without compromising the reliability of the results.
NASA Astrophysics Data System (ADS)
Bongio, Marco; Avanzi, Francesco; De Michele, Carlo
2016-12-01
The authors regret that the unit of measurement of yearly energetic production is mistyped in the paper. It is GWh instead of MWh in Fig.s 3, 8, 9, and 10, and throughout the text. Specifically in the text:
2. INTERIOR OF POWERHOUSE BUILDING SHOWING EXCITER No. 1 (FOREGROUND), ...
2. INTERIOR OF POWERHOUSE BUILDING SHOWING EXCITER No. 1 (FOREGROUND), EXCITER No 2, AND GENERATOR UNIT No. 3. BAYS FOR TRANSFORMERS No. 3 AND 4 ARE VISIBLE ALONG SIDE-WALL IN BACKGROUND. STAIRS LEAD TO OFFICE. VIEW TO SOUTHEAST. - Kern County No. 1 Hydroelectric System, Powerhouse Exciters, Kern River Canyon, Bakersfield, Kern County, CA
DETAIL INTERIOR VIEW OF ELECTRIC GENERATOR ON UPPER LEVEL ON ...
DETAIL INTERIOR VIEW OF ELECTRIC GENERATOR ON UPPER LEVEL ON HYDROELECTRIC POWER HOUSE - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL
Dispatch Control with PEV Charging and Renewables for Multiplayer Game Application
DOE Office of Scientific and Technical Information (OSTI.GOV)
Davis, Nathan; Johnson, Brian; McJunkin, Timothy
This paper presents a demand response model for a hypothetical microgrid that integrates renewable resources and plug-in electric vehicle (PEV) charging systems. It is assumed that the microgrid has black start capability and that external generation is available for purchase while grid connected to satisfy additional demand. The microgrid is developed such that in addition to renewable, non-dispatchable generation from solar, wind and run of the river hydroelectric resources, local dispatchable generation is available in the form of small hydroelectric and moderately sized gas and coal fired facilities. To accurately model demand, the load model is separated into independent residential,more » commercial, industrial, and PEV charging systems. These are dispatched and committed based on a mixed integer linear program developed to minimize the cost of generation and load shedding while satisfying constraints associated with line limits, conservation of energy, and ramp rates of the generation units. The model extends a research tool to longer time frames intended for policy setting and educational environments and provides a realistic and intuitive understanding of beneficial and challenging aspects of electrification of vehicles combined with integration of green electricity production.« less
NASA Astrophysics Data System (ADS)
Alligné, S.; Nicolet, C.; Béguin, A.; Landry, C.; Gomes, J.; Avellan, F.
2017-04-01
The prediction of pressure and output power fluctuations amplitudes on Francis turbine prototype is a challenge for hydro-equipment industry since it is subjected to guarantees to ensure smooth and reliable operation of the hydro units. The European FP7 research project Hyperbole aims to setup a methodology to transpose the pressure fluctuations induced by the cavitation vortex rope from the reduced scale model to the prototype generating units. A Francis turbine unit of 444MW with a specific speed value of ν = 0.29, is considered as case study. A SIMSEN model of the power station including electrical system, controllers, rotating train and hydraulic system with transposed draft tube excitation sources is setup. Based on this model, a frequency analysis of the hydroelectric system is performed for all technologies to analyse potential interactions between hydraulic excitation sources and electrical components. Three technologies have been compared: the classical fixed speed configuration with Synchronous Machine (SM) and the two variable speed technologies which are Doubly Fed Induction Machine (DFIM) and Full Size Frequency Converter (FSFC).
Real options valuation and optimization of energy assets
NASA Astrophysics Data System (ADS)
Thompson, Matthew
In this thesis we present algorithms for the valuation and optimal operation of natural gas storage facilities, hydro-electric power plants and thermal power generators in competitive markets. Real options theory is used to derive nonlinear partial-integro-differential equations (PIDEs) for the valuation and optimal operating strategies of all types of facilities. The equations are designed to incorporate a wide class of spot price models that can exhibit the same time-dependent, mean-reverting dynamics and price spikes as those observed in most energy markets. Particular attention is paid to the operational characteristics of real energy assets. For natural gas storage facilities these characteristics include: working gas capacities, variable deliverability and injection rates and cycling limitations. For thermal power plants relevant operational characteristics include variable start-up times and costs, control response time lags, minimum generating levels, nonlinear output functions, structural limitations on ramp rates, and minimum up/down time restrictions. For hydro-electric units, head effects and environmental constraints are addressed. We illustrate the models with numerical examples of a gas storage facility, a hydro-electric pump storage facility and a thermal power plant. This PIDE framework is the first in the literature to achieve second order accuracy in characterizing the operating states of hydro-electric and hydro-thermal power plants. The continuous state space representation derived in this thesis can therefore achieve far greater realism in terms of operating state specification than any other method in the literature to date. This thesis is also the first and only to allow for any continuous time jump diffusion processes in order to account for price spikes.
NASA Technical Reports Server (NTRS)
Carlson, C. R.
1981-01-01
The user documentation of the SYSGEN model and its links with other simulations is described. The SYSGEN is a production costing and reliability model of electric utility systems. Hydroelectric, storage, and time dependent generating units are modeled in addition to conventional generating plants. Input variables, modeling options, output variables, and reports formats are explained. SYSGEN also can be run interactively by using a program called FEPS (Front End Program for SYSGEN). A format for SYSGEN input variables which is designed for use with FEPS is presented.
Hydroelectric Generating Facilities General Permit (HYDROGP) for Massachusetts & New Hampshire
Documents, links & contacts for the Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of MA.
GOVERNOR FOR #3 GENERATOR INSIDE ELWHA POWERHOUSEWOODWARD WATERWHEEL GOVERNOR TYPE ...
GOVERNOR FOR #3 GENERATOR INSIDE ELWHA POWERHOUSE--WOODWARD WATERWHEEL GOVERNOR TYPE HR: 21,500 LBS OF THRUST, SIZE 11 BORE & STROKE. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA
Multi-time scale energy management of wind farms based on comprehensive evaluation technology
NASA Astrophysics Data System (ADS)
Xu, Y. P.; Huang, Y. H.; Liu, Z. J.; Wang, Y. F.; Li, Z. Y.; Guo, L.
2017-11-01
A novel energy management of wind farms is proposed in this paper. Firstly, a novel comprehensive evaluation system is proposed to quantify economic properties of each wind farm to make the energy management more economical and reasonable. Then, a combination of multi time-scale schedule method is proposed to develop a novel energy management. The day-ahead schedule optimizes unit commitment of thermal power generators. The intraday schedule is established to optimize power generation plan for all thermal power generating units, hydroelectric generating sets and wind power plants. At last, the power generation plan can be timely revised in the process of on-line schedule. The paper concludes with simulations conducted on a real provincial integrated energy system in northeast China. Simulation results have validated the proposed model and corresponding solving algorithms.
1. Pipe Floor Rear Corridor, view to the southeast. The ...
1. Pipe Floor Rear Corridor, view to the southeast. The wall of Unit 2 turbine pit is visible in the right foreground. The pipe and valve cluster in the right foreground is part of the blow down valve for Unit 2. This valve allows the water in the draft chest to be lowered (i.e., 'blown down') so that the unit can be motored (i.e., run like an electric motor rather than an electric power generator). - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID
Hiilangaay Hydroelectric Project – Final Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Twitchell, Sara; Stimac, Michael; Lang, Lisa
2016-06-01
The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible tomore » move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy« less
Hydropower in Southeast United States, -a Hydroclimatological Perspective
NASA Astrophysics Data System (ADS)
Engstrom, J.
2016-12-01
Hydropower is unique among renewable energy sources for the ability to store its fuel (water) in reservoirs. The relationship between discharge, macro-scale drivers, and production is complex since production depends not only on water availability, but also upon decisions made by the institution owning the facility that has to consider many competing interests including economics, drinking water supply, recreational uses, etc. This analysis shows that the hydropower plants in Southeast U.S. (AL, GA, NC, SC, and TN) exhibit considerable year to year variability in production. Although the hydroclimatology of the Southeast U.S. has been analyzed partially, no previous study has linked the region's hydroelectricity production to any reported causes of interannual hydroclimatological variability, as has been completed in other regions. Due to the current short-term hydroelectricity production forecasts, the water resource is not optimized from a hydropower perspective as electricity generating potential is not maximized. The results of this study highlight the amount of untapped hydroelectricity that could be produced if long term hydroclimate and large-scale climate drivers were considered in production forecasts.
VIEW OF #2 EXCITER WITH GOVERNOR ON GENERATOR FLOOR. THIS ...
VIEW OF #2 EXCITER WITH GOVERNOR ON GENERATOR FLOOR. THIS EXCITER IS DRIVEN BY A HORIZONTAL KAPLAN WHEEL LOCATED ON OPPOSITE SIDE OF WALL IN WHEELROOM. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-05
... feasibility of the George W. Andrews Hydroelectric Project located at the existing George W. Andrews Lock and.... Andrews Lock and Dam Hydroelectric Project by Brookfield Power (Project No. 13077-000, filed on November... have an average annual generation of 89 gigawatt-hours. The proposed George W. Andrews Hydroelectric...
Hydroelectric Generating Facilities General Permit ...
2017-08-28
The Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of Massachusetts was published in the Federal Register on December 7, 2009 (see 74 Fed. Reg. No. 233, pages 64074 - 64075).
NASA Astrophysics Data System (ADS)
Guo, W. C.; Yang, J. D.; Chen, J. P.; Peng, Z. Y.; Zhang, Y.; Chen, C. C.
2016-11-01
Load rejection test is one of the essential tests that carried out before the hydroelectric generating set is put into operation formally. The test aims at inspecting the rationality of the design of the water diversion and power generation system of hydropower station, reliability of the equipment of generating set and the dynamic characteristics of hydroturbine governing system. Proceeding from different accident conditions of hydroelectric generating set, this paper presents the transient processes of load rejection corresponding to different accident conditions, and elaborates the characteristics of different types of load rejection. Then the numerical simulation method of different types of load rejection is established. An engineering project is calculated to verify the validity of the method. Finally, based on the numerical simulation results, the relationship among the different types of load rejection and their functions on the design of hydropower station and the operation of load rejection test are pointed out. The results indicate that: The load rejection caused by the accident within the hydroelectric generating set is realized by emergency distributing valve, and it is the basis of the optimization for the closing law of guide vane and the calculation of regulation and guarantee. The load rejection caused by the accident outside the hydroelectric generating set is realized by the governor. It is the most efficient measure to inspect the dynamic characteristics of hydro-turbine governing system, and its closure rate of guide vane set in the governor depends on the optimization result in the former type load rejection.
ERIC Educational Resources Information Center
Peterson, James N.; Hess, Herbert L.
An undergraduate capstone engineering design project now provides hydroelectric power to a remote wilderness location. Students investigated the feasibility of designing, building, and installing a 4kW hydroelectric system to satisfy the need for electric power to support the research and teaching functions of Taylor Ranch, a university facility…
Strategic Response to Energy-Related Security Threats in the US Department of Defense
2014-10-15
generation in the United States are fossil fuels . These include coal, natural gas, and oil . In some cases solar, wind, geothermal, and hydroelectric...and findings. The research addressed engagement on climate change and energy security issues by DoD across various tiers and sectors of the...on climate change and energy security issues by DoD across various tiers and sectors of the organization. Specifically, a tripartite analysis
Recovery Act. Tapoco project. Cheoah upgrade
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tran, Paul
2013-10-02
Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.
Canton hydroelectric project: feasibility study. Final report, appendices
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-05-01
These appendices contain legal, environmental, regulatory, technical and economic information used in evaluating the feasibility of redeveloping the hydroelectric power generating facilities at the Upper and Lower Dams of the Farmington River at Collinsville, CT. (LCL)
22. Blow Down Valve for Unit 1, view to the ...
22. Blow Down Valve for Unit 1, view to the southwest. This valve allows the water in the draft chest to be lowered (i.e., 'blown down') so that the unit can be motored (i.e., run like an electric motor rather than an electric power generator). The valve is operated by pressure from the instrument air system (part of which is visible in photograph MT-105-A-17 above), but the unit draws on the station air system (see photograph MT-105-A-24 below) to lower the water in the draft chest. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT
Othman, Faridah; Taghieh, Mahmood
2016-01-01
Optimal operation of water resources in multiple and multipurpose reservoirs is very complicated. This is because of the number of dams, each dam’s location (Series and parallel), conflict in objectives and the stochastic nature of the inflow of water in the system. In this paper, performance optimization of the system of Karun and Dez reservoir dams have been studied and investigated with the purposes of hydroelectric energy generation and providing water demand in 6 dams. On the Karun River, 5 dams have been built in the series arrangements, and the Dez dam has been built parallel to those 5 dams. One of the main achievements in this research is the implementation of the structure of production of hydroelectric energy as a function of matrix in MATLAB software. The results show that the role of objective function structure for generating hydroelectric energy in weighting method algorithm is more important than water supply. Nonetheless by implementing ε- constraint method algorithm, we can both increase hydroelectric power generation and supply around 85% of agricultural and industrial demands. PMID:27248152
Analysis of synchronous and induction generators used at hydroelectric power plant
NASA Astrophysics Data System (ADS)
Diniş, C. M.; Popa, G. N.; lagăr, A.
2017-01-01
In this paper is presented an analysis of the operating electric generators (synchronous and induction) within a small capacity hydroelectric power plant. Such is treated the problem of monitoring and control hydropower plant using SCADA systems. Have been carried an experimental measurements in small hydropower plant for different levels of water in the lake and various settings of the operating parameters.
DETAIL OF WESTINGHOUSE AND B. MORGAN SMITH NAMEPLATES ON ELECTRIC ...
DETAIL OF WESTINGHOUSE AND B. MORGAN SMITH NAMEPLATES ON ELECTRIC GENERATOR IN UPPER LEVEL OF HYDROELECTRIC POWER HOUSE - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL
NASA Astrophysics Data System (ADS)
Che Munaaim, M. A.; Razali, N.; Ayob, A.; Hamidin, N.; Othuman Mydin, M. A.
2018-03-01
A micro hydroelectric generator is an energy conversion approach to generate electricity from potential (motion) energy to an electrical energy. In this research, it is desired to be implemented by using a micro hydroelectric generator which is desired to be embedded at the continuous flow of effluent discharge point of domestic sewerage treatment plant (STP). This research evaluates the potential of electricity generation from micro hydroelectric generator attached to 30,000 PE sewerage treatment plant. The power output obtained from calculation of electrical power conversion is used to identify the possibility of this system and its ability to provide electrical energy, which can minimize the cost of electric bill especially for the pumping system. The overview of this system on the practical application with the consideration of payback period is summarized. The ultimate aim of the whole application is to have a self-ecosystem electrical power generated for the internal use of STP by using its own flowing water in supporting the sustainable engineering towards renewable energy and energy efficient approach. The results shows that the output power obtained is lower than expected output power (12 kW) and fall beyond of the range of a micro hydro power (5kW - 100kW) since it is only generating 1.58 kW energy by calculation. It is also observed that the estimated payback period is longer which i.e 7 years to recoup the return of investment. A range of head from 4.5 m and above for the case where the flow shall at least have maintained at 0.05 m3/s in the selected plant in order to achieved a feasible power output. In conclusion, wastewater treatment process involves the flowing water (potential energy) especially at the effluent discharge point of STP is possibly harvested for electricity generation by embedding the micro hydroelectric generator. However, the selection of STP needs to have minimum 4.5 meter head with 0.05 m3/s of continuously flowing water to make it feasible to harvest.
4. Main Control Switchboard (south end rear), view to the ...
4. Main Control Switchboard (south end rear), view to the north, with item 2 (the load frequency control panel) visible in right foreground, through item 7 (generator Unit 4 control panel) obliquely visible on left side of the photograph. Part of item 1 (the synchronization monitor) is visible behind the phone on right side of photograph. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT
Indian energy sources in 1980's
NASA Astrophysics Data System (ADS)
Chaturvedi, A. C.
Indian energy sources for electrical power generation are surveyed with a view to the development of the available hydroelectric resources. The capital-intensive nature of hydroelectric projects and their long gestation periods have impeded the rapid exploitation of the hydroelectric resources in the country, which are expected to provide 37% of the 16,200 MW capacity anticipated by 2001. Alternative sources of power such as solar and wind energy, biogas conversion and the use of industrial waste heat to produce electricity are discussed with case studies presented.
33 CFR 209.141 - Coordination of hydroelectric power operations with power marketing agencies.
Code of Federal Regulations, 2013 CFR
2013-07-01
... CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE PROCEDURE § 209.141... establishes policies and procedures for coordinating the operation of the Corps of Engineers' hydroelectric... civil works field operating agencies (FOA) having generating facilities producing marketable electric...
33 CFR 209.141 - Coordination of hydroelectric power operations with power marketing agencies.
Code of Federal Regulations, 2011 CFR
2011-07-01
... CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE PROCEDURE § 209.141... establishes policies and procedures for coordinating the operation of the Corps of Engineers' hydroelectric... civil works field operating agencies (FOA) having generating facilities producing marketable electric...
33 CFR 209.141 - Coordination of hydroelectric power operations with power marketing agencies.
Code of Federal Regulations, 2012 CFR
2012-07-01
... CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE PROCEDURE § 209.141... establishes policies and procedures for coordinating the operation of the Corps of Engineers' hydroelectric... civil works field operating agencies (FOA) having generating facilities producing marketable electric...
33 CFR 209.141 - Coordination of hydroelectric power operations with power marketing agencies.
Code of Federal Regulations, 2014 CFR
2014-07-01
... CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE ADMINISTRATIVE PROCEDURE § 209.141... establishes policies and procedures for coordinating the operation of the Corps of Engineers' hydroelectric... civil works field operating agencies (FOA) having generating facilities producing marketable electric...
33 CFR 209.141 - Coordination of hydroelectric power operations with power marketing agencies.
Code of Federal Regulations, 2010 CFR
2010-07-01
... power operations with power marketing agencies. 209.141 Section 209.141 Navigation and Navigable Waters... Coordination of hydroelectric power operations with power marketing agencies. (a) Purpose. This regulation... generating facilities with the power marketing agencies. (b) Applicability. This regulation applies to all...
Improved evaluation of the blue water footprint from hydropower in the United States
NASA Astrophysics Data System (ADS)
Zhao, G.; Gao, H.
2017-12-01
As the world's largest source of renewable energy, hydropower contributes 16.6% of the electricity production in the world. Even though it produces no waste, hydropower exhausts a considerable amount of water mostly through evaporation from the extended surface areas of the manmade lakes. The water footprint of hydropower becomes even larger with rising temperatures. To assist with the precise management of both water resources and energy production in the Contiguous United States (CONUS), 82 major dams—all with a primary purpose of producing hydroelectric power—were evaluated in terms of their blue water footprints. These dams account for 21% of the entire hydropower generation in the CONUS. Reservoir evaporation is calculated using state-of-the-art reservoir surface area and evaporation rate information. Instead of using fixed surface areas for the reservoirs—a practice which is adopted by virtually all other studies (and generally leads to over-or-under estimations)—time-variant surface areas were generated from Landsat imageries archived on Google Earth Engine (GEE) platform. Additionally, evaporation rates were calculated using an equilibrium method that incorporates the heat storage effects of the reservoirs. Results show that water consumption from hydropower is large and non-negligible. Furthermore, the differences of the blue water footprints among the dams studied are also significant. The results of this study can benefit the evaluation of existing dams (e.g. recommendation for dam removal) and the planning of future hydroelectric dams.
NASA Astrophysics Data System (ADS)
Alligné, S.; Maruzewski, P.; Dinh, T.; Wang, B.; Fedorov, A.; Iosfin, J.; Avellan, F.
2010-08-01
The growing development of renewable energies combined with the process of privatization, lead to a change of economical energy market strategies. Instantaneous pricings of electricity as a function of demand or predictions, induces profitable peak productions which are mainly covered by hydroelectric power plants. Therefore, operators harness more hydroelectric facilities at full load operating conditions. However, the Francis Turbine features an axi-symmetric rope leaving the runner which may act under certain conditions as an internal energy source leading to instability. Undesired power and pressure fluctuations are induced which may limit the maximum available power output. BC Hydro experiences such constraints in a hydroelectric power plant consisting of four 435 MW Francis Turbine generating units, which is located in Canada's province of British Columbia. Under specific full load operating conditions, one unit experiences power and pressure fluctuations at 0.46 Hz. The aim of the paper is to present a methodology allowing prediction of this prototype's instability frequency from investigations on the reduced scale model. A new hydro acoustic vortex rope model has been developed in SIMSEN software, taking into account the energy dissipation due to the thermodynamic exchange between the gas and the surrounding liquid. A combination of measurements, CFD simulations and computation of eigenmodes of the reduced scale model installed on test rig, allows the accurate calibration of the vortex rope model parameters at the model scale. Then, transposition of parameters to the prototype according to similitude laws is applied and stability analysis of the power plant is performed. The eigenfrequency of 0.39 Hz related to the first eigenmode of the power plant is determined to be unstable. Predicted frequency of the full load power and pressure fluctuations at the unit unstable operating point is found to be in general agreement with the prototype measurements.
11. DETAIL VIEW OF GENERATOR NO. 1, GENERATOR ROOM, SHOWING ...
11. DETAIL VIEW OF GENERATOR NO. 1, GENERATOR ROOM, SHOWING GRAVITY LUBRICATING OIL BOX ABOVE GENERATOR - Nine Mile Hydroelectric Development, Powerhouse, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA
EXTERNAL OVERVIEW OF WHEELROOM (TURBINE ROOM) WITH PENSTOCK FOR #1 ...
EXTERNAL OVER-VIEW OF WHEELROOM (TURBINE ROOM) WITH PENSTOCK FOR #1 AND #2 GENERATORS AND #2 EXCITER, VIEWED WEST TO EAST. TURBINES ARE HORIZONTAL TWIN FRANCIS TURBINES, MANUFACTURED BY WELLMAN-SEAVER MORGAN CO. IN 1911. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-20
... opportunity to purchase and/or market the power that would be generated by such development under a lease of... develop hydroelectric power at Granby Dam Outlet, and power purchasing and/or marketing considerations... Office (GP-2200), P.O. Box 36900, Billings, MT 59107-6900. Information related to Western's purchasing...
Luby, Brittany
2015-01-01
This paper explores how Anishinabek women managed their households during the hydroelectric boom of the 1950s and provides new insight into flooding impact analyses. To date, historians have sought to understand how hydroelectric development compromised "subsistence" living. Research has addressed declining fish and game populations and the corresponding decline in male employment. But, what do these trends mean once the nets and traps have been emptied? By focusing on the family home, we discover that hydroelectric power generation on the Winnipeg River disrupted the environment's ability to provide resources necessary to maintain women's reproductive health (especially breast milk). Food shortages caused by hydroelectric development in the postwar era compromised Anishinabek women's ability to raise their children in accordance with cultural expectations. What emerges from this analysis is a new lens through which to theorize the voluntary enrolment of Anishinabek children in residential schools in northwestern Ontario.
83. OVERVIEW OF PARTIALLY COMPLETED POWERHOUSE WITH TWO UNITS IN ...
83. OVERVIEW OF PARTIALLY COMPLETED POWERHOUSE WITH TWO UNITS IN OPERATION, LOOKING UPSTREAM, Print No. 274, June 1904 - Electron Hydroelectric Project, Along Puyallup River, Electron, Pierce County, WA
NASA Astrophysics Data System (ADS)
Hogeboom, Rick J.; Knook, Luuk; Hoekstra, Arjen Y.
2018-03-01
For centuries, humans have resorted to building dams to gain control over freshwater available for human consumption. Although dams and their reservoirs have made many important contributions to human development, they receive negative attention as well, because of the large amounts of water they can consume through evaporation. We estimate the blue water footprint of the world's artificial reservoirs and attribute it to the purposes hydroelectricity generation, irrigation water supply, residential and industrial water supply, flood protection, fishing and recreation, based on their economic value. We estimate that economic benefits from 2235 reservoirs included in this study amount to 265 × 109 US a year, with residential and industrial water supply and hydroelectricity generation as major contributors. The water footprint associated with these benefits is the sum of the water footprint of dam construction (<1% contribution) and evaporation from the reservoir's surface area, and globally adds up to 66 × 109 m3 y-1. The largest share of this water footprint (57%) is located in non-water scarce basins and only 1% in year-round scarce basins. The primary purposes of a reservoir change with increasing water scarcity, from mainly hydroelectricity generation in non-scarce basins, to residential and industrial water supply, irrigation water supply and flood control in scarcer areas.
10. VIEW OF GENERATING ROOM, POWERHOUSE, SHOWING ORIGINAL GENERATORS NOS. ...
10. VIEW OF GENERATING ROOM, POWERHOUSE, SHOWING ORIGINAL GENERATORS NOS. 1 THROUGH 4, WITH NO. 4 GENERATOR IN FOREGROUND - Nine Mile Hydroelectric Development, Powerhouse, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA
Global analysis of a renewable micro hydro power generation plant
NASA Astrophysics Data System (ADS)
Rahman, Md. Shad; Nabil, Imtiaz Muhammed; Alam, M. Mahbubul
2017-12-01
Hydroelectric power or Hydropower means the power generated by the help of flowing water with force. It is one the best source of renewable energy in the world. Water evaporates from the earth's surface, forms clouds, precipitates back to earth, and flows toward the ocean. Hydropower is considered a renewable energy resource because it uses the earth's water cycle to generate electricity. As far as Global is concerned, only a small fraction of electricity is generated by hydro-power. The aim of our analysis is to demonstrate and observe the hydropower of the Globe in micro-scale by our experimental setup which is completely new in concept. This paper consists of all the Global and National Scenario of Hydropower. And how we can more emphasize the generation of Hydroelectric power worldwide.
12. DETAIL VIEW OF GENERATOR BAY, GENERATOR ROOM, SHOWING TURBINEGENERATOR ...
12. DETAIL VIEW OF GENERATOR BAY, GENERATOR ROOM, SHOWING TURBINE-GENERATOR DRIVE SHAFT IN FOREGROUND, ACCESS BULKHEAD TO TURBINE IN BACKGROUND - Nine Mile Hydroelectric Development, Powerhouse, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA
Status of downstream fish passage at hydroelectric projects in the northeast, USA
Odeh, Mufeed; Orvis, Curtis
1997-01-01
In the northeastern United States several guidance, protection, and conveyance methods have been employed to assist downstream migrating fish. Overlay racks, standard bar racks with close spacing, louvers, curtain walls, guide walls, netting, and other means have been used to guide and protect fish from entrainment. The design process of these facilities comprises consideration of various factors, including flow approach, attraction flow, guidance and protection devices, bypass location, conveyance mechanism, and plunge pool conditions. This paper presents the status of the design criteria for downstream fish passage facilities at hydroelectric sites in the northeast part of the United States. Examples of existing facilities are given.
111. Detail of butterfly valve for turbine unit no. 2. ...
111. Detail of butterfly valve for turbine unit no. 2. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA
ERIC Educational Resources Information Center
Department of the Interior, Denver, CO. Engineering and Research Center.
Subjects covered in this text are controlling the hydroelectric generator, generator excitation, basic principles of direct current generation, direction of current flow, basic alternating current generator, alternating and direct current voltage outputs, converting alternating current to direct current, review of the basic generator and…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1980-01-01
Updated information on water resources in the Potomac River Basin is presented for use by the FERC and its staff when considering hydroelectric licensing and other work. The report presents data on water resource developments, existing and potential, and on water use by existing and projected steam-electric generating facilities. Past and present planning studies are summarized.
Itaipu royalties: The role of the hydroelectric sector in water resource management.
Lorenzon, Alexandre Simões; Alvares Soares Ribeiro, Carlos Antonio; Rosa Dos Santos, Alexandre; Marcatti, Gustavo Eduardo; Domingues, Getulio Fonseca; Soares, Vicente Paulo; Martins de Castro, Nero Lemos; Teixeira, Thaisa Ribeiro; Martins da Costa de Menezes, Sady Júnior; Silva, Elias; de Oliveira Barros, Kelly; Amaral Dino Alves Dos Santos, Gleissy Mary; Ferreira da Silva, Samuel; Santos Mota, Pedro Henrique
2017-02-01
For countries dependent on hydroelectricity, water scarcity poses a real risk. Hydroelectric plants are among the most vulnerable enterprises to climate change. Investing in the conservation of the hydrographic basin is a solution found by the hydropower sector. Given the importance of the Itaipu plant to the energy matrix of Brazil and Paraguay, the aim of this study is to review the current distribution of royalties from Itaipu, using the hydrographic basin as a of criterion of analysis. Approximately 98.73% of the Itaipu basin is in Brazil. The flow contributes 99% of the total electricity generated there, while the drop height of the water contributes only 1%. Under the current policy, royalties are shared equally between Brazil and Paraguay. In the proposed approach, each country would receive a percentage for their participation in the drop height and water flow in the output of the turbines, which are intrinsic factors for electricity generation. Thus, Brazil would receive 98.35% of the royalties and Paraguay, 1.65%. The inclusion of the hydrographic basin as a criterion for the distribution of royalties will promote more efficient water resource management, since the payment will be distributed throughout the basin of the plant. The methodology can be applied to hydroelectric projects worldwide. Copyright © 2016 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Purvis, Edward E.; Teagan, Peter; Little, Arthur D.
1979-04-01
Annex 6, which investigates the possible hydroelectric resources of Egypt, reveals that presently the only existing sites are on the upper Nile at the High and Aswan Dams. There are 8 sites on the Nile where it is practical to add hydroelectric generation and, of these, only 4 are feasible for immediate construction. There are also pumped-storage sites on the Nile and the Red Sea. There is also the Qattara Depression in the Western Desert which can be utilized for conventional, as well as pumped-storage generation, by bringing water from the Mediterranean Sea to the depression by canal or tunnel.more » The options were considered for construction of hydro plants to met the electric load growth of Egypt when other forms of energy supply would be integrated into a comprehensive supply pattern. In Annex 7, the prospective use of nuclear energy to meet Egypt's resources (uranium and thorium) to implement a nuclear energy program, and potential effects of the expanded use of nuclear energy are discussed. Annex 8 discusses solar energy (technology descriptions and impacts, solar thermal power, photovoltaics). Also wind power generation, biomass utilization, desalination, solar air conditioning and refrigeration, and cost of power from diesel engines are discussed. Annex 9 covers geothermal potentials in Egypt, discussing resources with temperatures above 180/sup 0/C; from 150 to 180/sup 0/C; from 100 to 150/sup 0/C; and with temperatures below 100/sup 0/C. Annex 10 discusses the electric power systems in Egypt. The following subjects are covered: existing electric power systems; electrical power facilities under construction or planned for construction by 1985; past and projected growth of electrical energy; distribution; and electrical power system projected from 1985 to 2000. (MCW)« less
NASA Astrophysics Data System (ADS)
Min, Li; Zhang, Xiaolei; Zhang, Faxiang; Sun, Zhihui; Li, ShuJuan; Wang, Meng; Wang, Chang
2017-10-01
In order to satisfy hydroelectric generating set low-frequency vibration monitoring, the design of Passive low-frequency vibration monitoring system based on Optical fiber sensing in this paper. The hardware of the system adopts the passive optical fiber grating sensor and unbalanced-Michelson interferometer. The software system is used to programming by Labview software and finishing the control of system. The experiment show that this system has good performance on the standard vibration testing-platform and it meets system requirements. The frequency of the monitoring system can be as low as 0.2Hz and the resolution is 0.01Hz.
15. INTERIOR OVERVIEW TO SOUTHEAST. ACTIVE CONTROL PANEL AND GENERATORS ...
15. INTERIOR OVERVIEW TO SOUTHEAST. ACTIVE CONTROL PANEL AND GENERATORS AT LEFT, HISTORIC CONTROL PANEL AT RIGHT. - Santa Ana River Hydroelectric System, SAR-1 Powerhouse, Redlands, San Bernardino County, CA
Hydropower versus irrigation—an analysis of global patterns
NASA Astrophysics Data System (ADS)
Zeng, Ruijie; Cai, Ximing; Ringler, Claudia; Zhu, Tingju
2017-03-01
Numerous reservoirs around the world provide multiple flow regulation functions; key among these are hydroelectricity production and water releases for irrigation. These functions contribute to energy and food security at national, regional and global levels. While reservoir operations for hydroelectricity production might support irrigation, there are also well-known cases where hydroelectricity production reduces water availability for irrigated food production. This study assesses these relationships at the global level using machine-learning techniques and multi-source datasets. We find that 54% of global installed hydropower capacity (around 507 thousand Megawatt) competes with irrigation. Regions where such competition exists include the Central United States, northern Europe, India, Central Asia and Oceania. On the other hand, 8% of global installed hydropower capacity (around 79 thousand Megawatt) complements irrigation, particularly in the Yellow and Yangtze River Basins of China, the East and West Coasts of the United States and most river basins of Southeast Asia, Canada and Russia. No significant relationship is found for the rest of the world. We further analyze the impact of climate variables on the relationships between hydropower and irrigation. Reservoir flood control functions that operate under increased precipitation levels appear to constrain hydroelectricity production in various river basins of the United States, South China and most basins in Europe and Oceania. On the other hand, increased reservoir evaporative losses and higher irrigation requirements due to higher potential evaporation levels may lead to increased tradeoffs between irrigation and hydropower due to reduced water availability in regions with warmer climates, such as India, South China, and the Southern United States. With most reservoirs today being built for multiple purposes, it is important for policymakers to understand and plan for growing tradeoffs between key functions. This will be particularly important as climate mitigation calls for an increase in renewable energy while agro-hydrological impacts of climate change, population and economic growth and associated dietary change increase the need for irrigated food production in many regions round the world.
1. Photocopy of photograph, c. 1904. VIEW OF HONEYWOOD MILL ...
1. Photocopy of photograph, c. 1904. VIEW OF HONEYWOOD MILL SETTLEMENT AT DAM 5, ORIGINALLY ERECTED AS A FLOUR MILL IN THE 1830s, CONVERTED TO A PULP GRINDING MILL IN THE 1880; HYDROELECTRIC GENERATING EQUIPMENT INSTALLED BY MARTINSBURG POWER COMPANY IN 1904. (Courtesy of the Potomac Edison Company Library (Hagerstown, MD), Historical Data Files, Dam No. 5 listing) - Dam No. 5 Hydroelectric Plant, On Potomac River, Hedgesville, Berkeley County, WV
Regional water consumption for hydro and thermal electricity generation in the United States
Lee, Uisung; Han, Jeongwoo; Elgowainy, Amgad; ...
2017-05-18
Water is an essential resource for most electric power generation technologies. Thermal power plants typically require a large amount of cooling water whose evaporation is regarded to be consumed. Hydropower plants result in evaporative water loss from the large surface areas of the storing reservoirs. This paper estimated the regional water consumption factors (WCFs) for thermal and hydro electricity generation in the United States, because the WCFs of these power plants vary by region and water supply and demand balance are of concern in many regions. For hydropower, total WCFs were calculated using a reservoir’s surface area, state-level water evaporation,more » and background evapotranspiration. Then, for a multipurpose reservoir, a fraction of its WCF was allocated to hydropower generation based on the share of the economic valuation of hydroelectricity among benefits from all purposes of the reservoir. For thermal power plants, the variations in WCFs by type of cooling technology, prime mover technology, and by region were addressed. The results show that WCFs for electricity generation vary significantly by region. Finally, the generation-weighted average WCFs of thermoelectricity and hydropower are 1.25 (range of 0.18–2.0) and 16.8 (range of 0.67–1194) L/kWh, respectively, and the generation-weighted average WCF by the U.S. generation mix in 2015 is estimated at 2.18 L/kWh.« less
Regional water consumption for hydro and thermal electricity generation in the United States
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lee, Uisung; Han, Jeongwoo; Elgowainy, Amgad
Water is an essential resource for most electric power generation technologies. Thermal power plants typically require a large amount of cooling water whose evaporation is regarded to be consumed. Hydropower plants result in evaporative water loss from the large surface areas of the storing reservoirs. This paper estimated the regional water consumption factors (WCFs) for thermal and hydro electricity generation in the United States, because the WCFs of these power plants vary by region and water supply and demand balance are of concern in many regions. For hydropower, total WCFs were calculated using a reservoir’s surface area, state-level water evaporation,more » and background evapotranspiration. Then, for a multipurpose reservoir, a fraction of its WCF was allocated to hydropower generation based on the share of the economic valuation of hydroelectricity among benefits from all purposes of the reservoir. For thermal power plants, the variations in WCFs by type of cooling technology, prime mover technology, and by region were addressed. The results show that WCFs for electricity generation vary significantly by region. Finally, the generation-weighted average WCFs of thermoelectricity and hydropower are 1.25 (range of 0.18–2.0) and 16.8 (range of 0.67–1194) L/kWh, respectively, and the generation-weighted average WCF by the U.S. generation mix in 2015 is estimated at 2.18 L/kWh.« less
NASA Astrophysics Data System (ADS)
He, Yaoyao; Yang, Shanlin; Xu, Qifa
2013-07-01
In order to solve the model of short-term cascaded hydroelectric system scheduling, a novel chaotic particle swarm optimization (CPSO) algorithm using improved logistic map is introduced, which uses the water discharge as the decision variables combined with the death penalty function. According to the principle of maximum power generation, the proposed approach makes use of the ergodicity, symmetry and stochastic property of improved logistic chaotic map for enhancing the performance of particle swarm optimization (PSO) algorithm. The new hybrid method has been examined and tested on two test functions and a practical cascaded hydroelectric system. The experimental results show that the effectiveness and robustness of the proposed CPSO algorithm in comparison with other traditional algorithms.
15. Potential Transformer for Unit 2 and Operating Floor Front ...
15. Potential Transformer for Unit 2 and Operating Floor Front Corridor, view to the east-southeast. - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID
EXTERIOR VIEW SHOWING THE OILOSTATIC TERMINALS IN THE GENERATING PLANT ...
EXTERIOR VIEW SHOWING THE OILOSTATIC TERMINALS IN THE GENERATING PLANT SWITCH YARD. - Wilson Dam & Hydroelectric Plant, Oilostatic Transmission System, Spanning Tennessee River at Wilson Dam Road (Route 133), Muscle Shoals, Colbert County, AL
5. INTERIOR VIEW OF POWER HOUSE, LOOKING SOUTH, SHOWING 1500 ...
5. INTERIOR VIEW OF POWER HOUSE, LOOKING SOUTH, SHOWING 1500 HP TURBINE AND GENERATOR IN FOREGROUND, FRANCIS TURBINE AND GENERATOR AT REAR - Centerville Hydroelectric System, Powerhouse, Butte Creek, Centerville, Butte County, CA
2. Credit PEM. View of Martinsburg Power Company steam generating ...
2. Credit PEM. View of Martinsburg Power Company steam generating plant. From right to left: original 1889 generating building, transformer room, new generating room and, adjacent to draft stack is boiler room addition. Photo c. 1911. - Dam No. 4 Hydroelectric Plant, Potomac River, Martinsburg, Berkeley County, WV
19. OVERVIEW OF INTERIOR, LOOKING SOUTH. UNIT #2 IS AT ...
19. OVERVIEW OF INTERIOR, LOOKING SOUTH. UNIT #2 IS AT RIGHT FOREGROUND Historic photograph no. H-145, no date, held at Media Arts and Services Department, Pacific Gas & Electric Co., San Francisco, CA. - Centerville Hydroelectric System, Powerhouse, Butte Creek, Centerville, Butte County, CA
View of governor, water wheel, generator #1 and exciter (west ...
View of governor, water wheel, generator #1 and exciter (west end of Childs Powerhouse). Looking southeast - Childs-Irving Hydroelectric Project, Childs System, Childs Powerhouse, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ
Rule, Bridget M; Worth, Zeb J; Boyle, Carol A
2009-08-15
In order to make the best choice between renewable energy technologies, it is important to be able to compare these technologies on the basis of their sustainability, which may include a variety of social, environmental, and economic indicators. This study examined the comparative sustainability of four renewable electricity technologies in terms of their life cycle CO2 emissions and embodied energy, from construction to decommissioning and including maintenance (periodic component replacement plus machinery use), using life cycle analysis. The models developed were based on case studies of power plants in New Zealand, comprising geothermal, large-scale hydroelectric, tidal (a proposed scheme), and wind-farm electricity generation. The comparative results showed that tidal power generation was associated with 1.8 g of CO2/kWh, wind with 3.0 g of CO2/kWh, hydroelectric with 4.6 g of CO2/kWh, and geothermal with 5.6 g of CO2/kWh (not including fugitive emissions), and that tidal power generation was associated with 42.3 kJ/kWh, wind with 70.2 kJ/kWh, hydroelectric with 55.0 kJ/kWh, and geothermal with 94.6 kJ/kWh. Other environmental indicators, as well as social and economic indicators, should be applied to gain a complete picture of the technologies studied.
Reliability and economy -- Hydro electricity for Iran
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jahromi-Shirazi, M.J.; Zarbakhsh, M.H.
1998-12-31
Reliability is the probability that a device or system will perform its function adequately, for the period of time intended, under the operating conditions intended. Reliability and economy are two important factors in operating any system, especially in power generation. Due to the high rate in population growth in Iran, the experts have estimated that the demand for electricity will be about 63,000 MW in the next 25 years, the installed power is now about 26,000 MW. Therefore, the energy policy decision made in Iran is to go to power generation by hydroelectric plants because of reliability, availability of watermore » resources and the economics of hydroelectric power.« less
159. Credit PG&E. Using mules and horses to transport generator ...
159. Credit PG&E. Using mules and horses to transport generator base plate from Anderson, CA, to Northern California's Kilarc powerhouse, c. 1903. - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA
Estimated withdrawals and use of freshwater in Vermont, 1990
Horn, M.A.; Medalie, Laura
1996-01-01
Estimated freshwater withdrawals during 1990 in Vermont totaled about 632 million gallons per day. The largest withdrawals were for thermoelectric- power generation (82 percent), industrial use (7 percent), and public supply (6 percent). Most withdrawals, 587 million gallons per day, were made from surface-water sources as compared to 44.9 million gallons per day from ground-water sources. The largest withdrawals were in the Upper Connecticut-Mascomo River Basin (525 million gallons per day). About 17,700 million gallons per day were used instream for hydroelectric-poser generation, the largest of which were in the Upper Connecticut-Mascoma and Otter River Basins. Other information describing water-use patters is shown in tables, bar graphs, pie charts, maps, and accompanying text. The data are aggregated by river basin (hydrologic cataloging unit), and all amounts are reports in million gallons per day.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harto, C. B.; Yan, Y. E.; Demissie, Y. K.
2012-02-09
Electricity generation relies heavily on water resources and their availability. To examine the interdependence of energy and water in the electricity context, the impacts of a severe drought to assess the risk posed by drought to electricity generation within the western and Texas interconnections has been examined. The historical drought patterns in the western United States were analyzed, and the risk posed by drought to electricity generation within the region was evaluated. The results of this effort will be used to develop scenarios for medium- and long-term transmission modeling and planning efforts by the Western Electricity Coordination Council (WECC) andmore » the Electric Reliability Council of Texas (ERCOT). The study was performed in response to a request developed by the Western Governors Association in conjunction with the transmission modeling teams at the participating interconnections. It is part of a U.S. Department of Energy-sponsored, national laboratory-led research effort to develop tools related to the interdependency of energy and water as part of a larger interconnection-wide transmission planning project funded under the American Recovery and Reinvestment Act. This study accomplished three main objectives. It provided a thorough literature review of recent studies of drought and the potential implications for electricity generation. It analyzed historical drought patterns in the western United States and used the results to develop three design drought scenarios. Finally, it quantified the risk to electricity generation for each of eight basins for each of the three drought scenarios and considered the implications for transmission planning. Literature on drought impacts on electricity generation describes a number of examples where hydroelectric generation capacity has been limited because of drought but only a few examples of impact on thermoelectric generation. In all documented cases, shortfalls of generation were met by purchasing power from the market, albeit at higher prices. However, sufficient excess generation and transmission must be available for this strategy to work. Although power purchase was the most commonly discussed drought mitigation strategy, a total of 12 response strategies were identified in the literature, falling into four main categories: electricity supply, electricity demand response, alternative water supplies, and water demand response. Three hydrological drought scenarios were developed based on a literature review and historical data analysis. The literature review helped to identify key drought parameters and data on drought frequency and severity. Historical hydrological drought data were analyzed for the western United States to identify potential drought correlations and estimate drought parameters. The first scenario was a West-wide drought occurring in 1977; it represented a severe drought in five of the eight basins in the study area. A second drought scenario was artificially defined by selecting the conditions from the 10th-percentile drought year for each individual basin; this drought was defined in this way to allow more consistent analysis of risk to electricity generation in each basin. The final scenario was based upon the current low-flow hydro modeling scenario defined by WECC, which uses conditions from the year 2001. These scenarios were then used to quantify the risk to electricity generation in each basin. The risk calculations represent a first-order estimate of the maximum amount of electricity generation that might be lost from both hydroelectric and thermoelectric sources under a worst-case scenario. Even with the conservative methodology used, the majority of basins showed a limited amount of risk under most scenarios. The level of risk in these basins is likely to be amenable to mitigation by known strategies, combined with existing reserve generation and transmission capacity. However, the risks to the Pacific Northwest and Texas Basins require further study. The Pacific Northwest is vulnerable because of its heavy reliance on hydroelectric generation. Texas, conversely, is vulnerable because of its heavy dependence on thermoelectric generation, which relies on surface water for cooling, along with the fact that this basin seems to experience more severe drought events on average. Further modeling analysis will be performed in conjunction with the modeling teams at the participating interconnections (WECC and ERCOT) to explore the transmission implications of the drought scenarios in more detail. Given the first-order nature of this analysis, more detailed study of the potential impacts of drought on electricity generation is recommended. Future analyses should attempt to model the potential impacts of drought at the power-plant level, including potential mitigation strategies; include the effects of drought duration; understand the impacts of climate change; and consider economic impacts.« less
Yakama Nation Renewable Energy Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rigdon, Phillip
2016-05-10
It is the intention of the Yakama Nation to make improvements on the Wapato Irrigation Project (WIP) for the benefit of all stakeholders. Water management, water conservation and water allocation on the Wapato Irrigation Project is equally as important as hydropower. Irrigation will always be the primary purpose of this water system, but the irrigation system can also generate energy. The purpose of this project is the purchase and installation of inflow water turbines to generate an additional one megawatt of hydro-electrical power. The project will occur in two phases, Environmental Assessment and Project Implementation. The core objective for thismore » proposal is to meet the Yakama Nation’s goal in hydroelectric power development. This will include the installation of inflow water turbines on the Wapato Irrigation Project. The Yakama Nation will prepare an Environmental Assessment in preparation to purchase and install new water turbines for hydropower generation of 1 Megawatt. This is a valuable economic development strategy for Yakama Nation that will create new jobs, improve and increase rural electrification, and attract private investments. This water system has an untapped low head/low power potential without the need to construct a new dam. The objective of Phase 1 is to complete an environmental assessment and obtain approval to proceed with installation of the hydroelectric power system.« less
Comparative Study of Barotrauma Risk during Fish Passage through Kaplan Turbines
DOE Office of Scientific and Technical Information (OSTI.GOV)
Richmond, Marshall C.; Romero-Gomez, Pedro; Serkowski, John A.
Rapid pressure changes in hydroelectric turbine flows can cause barotrauma that can be hazardous to the passage of fish, in particular migratory juvenile salmonids. Although numerous laboratory tests have evaluated the effect of rapid decompression in fish species of relevance, numerical modeling studies offer the advantage of predicting, for new turbine designs, the potential risks of mortality and injury from rapid pressure change during turbine passage. However, rapid pressure change is only one of several hydraulic risks encountered by fish during turbine passage in addition to blade strike, shear, and turbulence. To better understand the role of rapid pressure changes,more » the present work focuses on the application of a computational fluid dynamics based method for evaluating the risk of pressure-related mortality to fish passing through an early 1960s era original hydroelectric Kaplan turbine at Wanapum Dam (Columbia River, Washington), and a modern advanced Kaplan turbine installed in 2005. The results show that the modeling approach acceptably reproduced the nadir pressure distributions compared to field data previously collected at the site using an autonomous sensor. Our findings show that the new advanced-design unit performs better, in terms of reduced barotrauma risk to fish from exposure to low pressures, than the original turbine unit. The outcomes allow for comparative analyses of turbine designs and operations prior to installation, an advantage that can potentially be integrated in the process of designing new turbine units to achieve superior environmental performance. Overall, the results show that modern turbine designs can achieve the multiple objectives of increasing power generation, lowering cavitation potential, and reducing barotrauma risks to passing fish.« less
9. VIEW OF FRANCIS TURBINE, GENERATOR DRIVE SHAFT. NOTE ORIGINAL ...
9. VIEW OF FRANCIS TURBINE, GENERATOR DRIVE SHAFT. NOTE ORIGINAL EXCITER AND GENERATOR RHEOSTATS ATOP CONTROL PANEL AT REAR. CONTROL PANEL IS ORIGINAL EXCEPT FOR HORIZONTAL TOP PANEL WITH CLOCK AT LEFT AND SYNCHROSCOPE AT RIGHT, LOOKING EAST - Centerville Hydroelectric System, Powerhouse, Butte Creek, Centerville, Butte County, CA
4. VIEW OF TURBINE PIT AT UNIT 3 SHOWING SERVOMOTOR ...
4. VIEW OF TURBINE PIT AT UNIT 3 SHOWING SERVO-MOTOR HEADS (BACKGROUND AT CENTER) WITH PISTON RODS BOLTED TO TURBINE GATE OPERATION RING (CENTER AT LEFT AND CENTER AT RIGHT). VIEW TO THE NORTH-NORTHWEST. - Black Eagle Hydroelectric Facility, Powerhouse, Great Falls, Cascade County, MT
6. View of turbine pit at unit 3 showing servomotor ...
6. View of turbine pit at unit 3 showing servo-motor head (left of center) with piston rods bolted to turbine gate operation ring (right foreground). View to southeast. - Holter Hydroelectric Facility, Dam & Power House, End of Holter Dam Road, Wolf Creek, Lewis and Clark County, MT
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-13
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2662-000] FirstLight Hydro...Light Hydro Generating Company, licensee for the Scotland Hydroelectric Project, filed an Application... license for Project No. 2662 [[Page 56638
Code of Federal Regulations, 2014 CFR
2014-01-01
... Hydroelectric Power Generation See footnote 1 221112 Fossil Fuel Electric Power Generation See footnote 1 221113... Materials and Basic Forms and Shapes Merchant Wholesalers 100 424690 Other Chemical and Allied Products...
Water-use information for California
Templin, W.E.
1986-01-01
This pamphlet reports on the availability of water use information to and for the state of California, through the development of the State Water-Use Data System (SWUDS). SWUDS is currently organized into 12 water use categories: Agricultural non-irrigation; Commercial; Domestic; Industrial; Irrigation; Mining; Power generation--fossil fuel, geothermal, hydroelectric , nuclear; Sewage treatment; and Water supply. The information needs of this system include type of water use (by category); name of water user; location of water use (latitude/longitude, county, and hydrologic unit--drainage basin); sources of water supply and return (fresh, saline, or reclaimed surface or groundwater); volume of water withdrawn, delivered, consumed, released, and returned; and period of water use (month, year). (Lantz-PTT)
37. SAR2, SHOWING OIL CIRCUIT BREAKERS (ABOVE) AND GENERATOR FIELD ...
37. SAR-2, SHOWING OIL CIRCUIT BREAKERS (ABOVE) AND GENERATOR FIELD COIL CONTROL RHEOSTATS (BELOW). SCE negative no. 10331, November 1, 1923. Photograph by G. Haven Bishop. - Santa Ana River Hydroelectric System, SAR-2 Powerhouse, Redlands, San Bernardino County, CA
Operational recovery of turbine No. 3 at Potomac Edison`s Dam No. 4 hydrogenerating facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pelczar, R.S.
1995-12-31
The Potomac Edison Dam No. 4 hydroelectric generating station is a historic, turn of the century facility located on the Potomac River near Shepherdstown, West Virginia. The station, originally constructed in 1909, employed twin horizontal Francis hydroturbine generating systems. The systems are unique in that the turbines and generators are offset 37 feet, interconnected by rope and sheaves. In May 1989 a third vertical open flume turbine generating system was added to make use of available site capacity. Both the turbine and speed increaser were the largest products developed by their respective manufacturers for a hydro turbine-generator application. This papermore » will review the subsequent operational experience which led to the original speed increaser failure on unit No. 3 and replacement of the drive system including special design considerations to the replacement speed increaser and its support structure. Specific design challenges included: (1) Designing and implementing a reliable configuration. (2) Reducing operational sound levels. (3) Minimizing harmful structure-borne vibrations which were affecting the internal rotating elements. (4) Incorporating a system brake for emergency and service purposes.« less
Divestiture summary report: Sale of Eklutna and Snettisham hydroelectric projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-04-01
This report accompanies the legislative proposal to authorize sale of the two Alaskan Federal hydroelectric projects and close out the Alaska Power Administration (APA). The 78,210 kill Snettisham Project serving Juneau would be sold to the Alaska Energy Authority, a State corporation which owns six other hydroelectric projects. The 30,000 kill Eklutna Project serving the Anchorage and Matanuska Valley areas would be sold to the three electric utilities which now purchase power from that project. Terms and conditions for the sales are set out in negotiated Purchase Agreements. Key aspects include: (1) Development of Transition Plans within six months aftermore » Congress authorizes the divestiture. (2) Transaction Date to be set in the Transition Plans. (3) Description of assets to be transferred. (4) Price and payment terms. (5) Environmental Management Plans. (6) Protection of interests in several important non-power'' uses of project land and water. Under a separate agreement, the Purchasers assume responsibility for developing and implementing post-sale programs for protection, mitigation, and enhancement of fish and wildlife resources impacted by hydroelectric development in the Eldutna and Snettisham basins. The estimated sale proceeds to the United States Treasury are between $73.5 and $80.3 million, assuming the transactions are completed between October 1, 1992 and October 1, 1993. Eklutna and Snettisham are modest-sized, single-purpose hydroelectric projects involving small river basins entirely within Alaska. Locally, they are important long-term suppliers of economically-priced hydroelectric power. The sale terms and structure assure that the projects will continue to serve their intended purposes. Modest rate increases are expected over the short term, but long-term power rates are expected to be similar to those that would prevail under continued Federal ownership.« less
Divestiture summary report: Sale of Eklutna and Snettisham hydroelectric projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-04-01
This report accompanies the legislative proposal to authorize sale of the two Alaskan Federal hydroelectric projects and close out the Alaska Power Administration (APA). The 78,210 kill Snettisham Project serving Juneau would be sold to the Alaska Energy Authority, a State corporation which owns six other hydroelectric projects. The 30,000 kill Eklutna Project serving the Anchorage and Matanuska Valley areas would be sold to the three electric utilities which now purchase power from that project. Terms and conditions for the sales are set out in negotiated Purchase Agreements. Key aspects include: (1) Development of Transition Plans within six months aftermore » Congress authorizes the divestiture. (2) Transaction Date to be set in the Transition Plans. (3) Description of assets to be transferred. (4) Price and payment terms. (5) Environmental Management Plans. (6) Protection of interests in several important ``non-power`` uses of project land and water. Under a separate agreement, the Purchasers assume responsibility for developing and implementing post-sale programs for protection, mitigation, and enhancement of fish and wildlife resources impacted by hydroelectric development in the Eldutna and Snettisham basins. The estimated sale proceeds to the United States Treasury are between $73.5 and $80.3 million, assuming the transactions are completed between October 1, 1992 and October 1, 1993. Eklutna and Snettisham are modest-sized, single-purpose hydroelectric projects involving small river basins entirely within Alaska. Locally, they are important long-term suppliers of economically-priced hydroelectric power. The sale terms and structure assure that the projects will continue to serve their intended purposes. Modest rate increases are expected over the short term, but long-term power rates are expected to be similar to those that would prevail under continued Federal ownership.« less
Estimated use of water in the United States, 1965
Murray, Charles Richard
1968-01-01
Estimates of water use in the United States for 1965 indicate that an average of about 310 bgd (billion gallons per day) were withdrawn for public-supply, rural domestic and livestock, irrigation, and industrial (including thermoelectric power)uses--that is, about 1,600 gallons per capita per day. This represents an increase of 15 percent over the withdrawal of 270 bgd reported for 1960. Fresh water withdrawals for thermoelectric power generation increased nearly 25 percent during the 5 years, and saline water withdrawals increased 33 percent. An additional 2,300 bgd was used for hydroelectric power generation (waterpower), which also represented a 15-percent increase in 5 years. The quantity of water consumed-that is, water made unavailable for further possible withdrawal because of evaporation, incorporation in manufactured products, and other causes - was estimated to average 78 bgd for 1965, an increase of about 28 percent since 1960.Estimates made of the quantities of water withdrawn from surface and ground-water sources indicate withdrawals of 61 bgd of ground water, of which nearly 0.5 bgd was saline, and 250 bgd of surface water, of which 44 bgd was saline. The estimated amount of saline water used by industry increased 36 percent from 1960 to 1965. In addition to surface and ground water sources, reclaimed sewage supplied two-thirds of a billion gallons per day, mainly to irrigation and industry.The average annual streamflow in the United States is approximately 1,200 bgd, about four times the amount withdrawn for all purposes (except hydroelectric power) in 1965, and more than 15 times the estimated quantity of water consumed. However, comparisons of supply and demand in many river basins show that repeated use of the water is made, and at times in some basins all the available supply is consumed.In addition to tabulations of water-use data by States and by the water-use regions previously used, water-use tables are also given for the regions recently defined by the Water Resources Council for its national assessment.
Estimated water use, by county, in North Carolina, 1995
Walters, D.A.
1997-01-01
Data on water use in North Carolina were compiled for 1995 as part of a cooperative agreement between the U.S. Geological Survey and the Division of Water Resources of the North Carolina Department of Environment and Natural Resources. Data were compiled from a number of Federal, State, and private sources for the offstream water-use categories of public supply, domestic, commercial, industrial, mining, livestock, irrigation, and thermoelectric-power generation. Data also were collected for instream use from hydroelectric facilities. Total withdrawals (fresh and saline) during 1995 were an estimated 9,286 million gallons per day for the offstream water-use categories. About 94 percent of the water withdrawn was from surface water. Thermoelectric-power generation accounted for 80 percent of all withdrawals. Instream water use for hydroelectric-power generation totaled about 56,400 million gallons per day. Each water-use category is summarized in this report by county and source of water supply.
1993-02-01
Fueled 7,634,0(X) 51 Geothermal 1,302,M(K) 9 Nuclear 2,160,(MX) 14 Total Thermal 11,096,(kM) 74 Hydroelectric 3,877,M(X) 26 Solar 0 0t Total Company...Nuclear 16,273,963 17 "Total Thermal 48,094,316 50 Hydroelectric 8,007,631 8 Solar 35 0 Total Company Generation 56,101,982 58 Helms Pumpback Energy...returnable beverage containers, prohibition of disposable diapers , and other measures to reduce the volume of the urban solid waste streams. Appeaidix 19-B
Culinary and pressure irrigation water system hydroelectric generation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Christiansen, Cory
Pleasant Grove City owns and operates a drinking water system that included pressure reducing stations (PRVs) in various locations and flow conditions. Several of these station are suitable for power generation. The City evaluated their system to identify opportunities for power generation that can be implemented based on the analysis of costs and prediction of power generation and associated revenue. The evaluation led to the selection of the Battle Creek site for development of a hydro-electric power generating system. The Battle Creek site includes a pipeline that carries spring water to storage tanks. The system utilizes a PRV to reducemore » pressure before the water is introduced into the tanks. The evaluation recommended that the PRV at this location be replaced with a turbine for the generation of electricity. The system will be connected to the utility power grid for use in the community. A pelton turbine was selected for the site, and a turbine building and piping system were constructed to complete a fully functional power generation system. It is anticipated that the system will generate approximately 440,000 kW-hr per year resulting in $40,000 of annual revenue.« less
Estimated withdrawals and use of freshwater in New Hampshire, 1990
Medalie, Laura; Horn, M.A.
1994-01-01
Estimated freshwater withdrawals during 1990 in New Hampshire totaled about 422 million gallons per day from ground-water and surface-water sources. The largest withdrawals were for thermoelectric-power generation (60 percent), public supply (23 percent), and industrial use (9 percent). Most withdrawals, 358 million gallons per day, were made from surface- water sources, as compared to 63.7 million gallons per day from ground-water sources. The largest with- drawals were in the Merrimack river basin (322 million gallons per day). An additional 46,000 million gallons per day was used instream for hydroelectric-power generation, primarily in the Upper Androscoggin and Upper Connecticut River subbasins. Other information describing water-use patterns is shown in tables, bar graphs, pie charts, maps, and accompanying text. The data are aggregated by river basin (hydrologic cataloging unit), and all values are reported in million gallons per day.
Reconstructed Sediment Mobilization Processes in a Large Reservoir Using Short Sediment Cores
NASA Astrophysics Data System (ADS)
Cockburn, J.; Feist, S.
2014-12-01
Williston Reservoir in northern British Columbia (56°10'31"N, 124°06'33") was formed when the W.A.C. Bennett Dam was created in the late 1960s, is the largest inland body of water in BC and facilitates hydroelectric power generation. Annually the reservoir level rises and lowers with the hydroelectric dam operation, and this combined with the inputs from several river systems (Upper Peace, Finlay, Parsnip, and several smaller creeks) renews suspended sediment sources. Several short-cores retrieved from shallow bays of the Finlay Basin reveal near-annual sedimentary units and distinct patterns related to both hydroclimate variability and the degree to which the reservoir lowered in a particular year. Thin section and sedimentology from short-cores collected in three bays are used to evaluate sediment mobilization processes. The primary sediment sources in each core location is linked to physical inputs from rivers draining into the bays, aeolian contributions, and reworked shoreline deposits as water levels fluctuate. Despite uniform water level lowering across the reservoir, sediment sequences differed at each site, reflecting the local stream inputs. However, distinct organic-rich units, facilitated correlation across the sites. Notable differences in particle size distributions from each core points to important aeolian derived sediment sources. Using these sedimentary records, we can evaluate the processes that contribute to sediment deposition in the basin. This work will contribute to decisions regarding reservoir water levels to reduce adverse impacts on health, economic activities and recreation in the communities along the shores of the reservoir.
7. View of turbine pit at an exciter unit showing ...
7. View of turbine pit at an exciter unit showing servo-motor heads (foreground and background at left) with piston rods bolted to the operating ring of the turbine gate (foreground and background at center). View to northeast. - Holter Hydroelectric Facility, Dam & Power House, End of Holter Dam Road, Wolf Creek, Lewis and Clark County, MT
View of water wheel, generator #3 and exciter (at east ...
View of water wheel, generator #3 and exciter (at east end of Childs Powerhouse) on a single shaft. In foreground the governor and shut-off valve are visible. Looking southwest - Childs-Irving Hydroelectric Project, Childs System, Childs Powerhouse, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ
Ten years of the Three Gorges Dam: a call for policy overhaul
NASA Astrophysics Data System (ADS)
Yang, Xiankun; Lu, X. X.
2013-12-01
The Three Gorges Dam (TGD), the world’s largest source of ‘clean’ hydroelectric power (Shen and Xie 2004), has entered its tenth year after the first turbine went into operation in June 2003. The dam, with a generating capacity 20 times that of the United States’ Hoover Dam, has been hailed as a crucial part of a solution to China’s energy crisis. Despite great benefits, however, major concerns have been voiced over the disastrous environmental and social consequences of this massive engineering project (Stone 2011). In this paper, we review the benefits and impacts learned from the controversial megadam over the past decade and discuss perspective quests on policy overhaul for future environmental protection.
16. Governor Accumulator Tanks for Units 3 and 4 and ...
16. Governor Accumulator Tanks for Units 3 and 4 and Grounding Transformer for Unit 4, view to the east. The back of the governor housing is visible in center of photograph, between the accumulator tanks. The grounding transformer for Unit 4 is located on left side of photograph, behind wire mesh safety cage. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT
75 FR 67993 - Hydropower Resource Assessment at Existing Reclamation Facilities-Draft Report
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-04
... largest producer of hydroelectric power in the United States, and is actively engaged in looking for... Web site: http://www.usbr.gov/power/ . FOR FURTHER INFORMATION CONTACT: Mr. Michael Pulskamp, 303-445...
Determining the Performances of Guide Bearings for Hydroturbines,
are used as guide supports of hydraulic units. Concrete results are presented for the design of the pilot bearing of a hydroturbine , which is installed at the main hydroelectric power station of the Vakhshskiy cascade. (Author)
80. VIEW OF PLACING WHEELS IN SHAFT OF NO. 2 ...
80. VIEW OF PLACING WHEELS IN SHAFT OF NO. 2 UNIT IN POSITION. OVERVIEW LOOKING EAST IN THE POWERHOUSE, Print No. 234, April 1904 - Electron Hydroelectric Project, Along Puyallup River, Electron, Pierce County, WA
River Devices to Recover Energy with Advanced Materials (River DREAM)
DOE Office of Scientific and Technical Information (OSTI.GOV)
McMahon, Daniel P.
2013-07-03
The purpose of this project is to develop a generator called a Galloping Hydroelectric Energy Extraction Device (GHEED). It uses a galloping prism to convert water flow into linear motion. This motion is converted into electricity via a dielectric elastomer generator (DEG). The galloping mechanism and the DEG are combined to create a system to effectively generate electricity. This project has three research objectives: 1. Oscillator development and design a. Characterize galloping behavior, evaluate control surface shape change on oscillator performance and demonstrate shape change with water flow change. 2. Dielectric Energy Generator (DEG) characterization and modeling a. Characterize andmore » model the performance of the DEG based on oscillator design 3. Galloping Hydroelectric Energy Extraction Device (GHEED) system modeling and integration a. Create numerical models for construction of a system performance model and define operating capabilities for this approach Accomplishing these three objectives will result in the creation of a model that can be used to fully define the operating parameters and performance capabilities of a generator based on the GHEED design. This information will be used in the next phase of product development, the creation of an integrated laboratory scale generator to confirm model predictions.« less
Hooked on Coal: Meeting Energy Demands in the Philippines
2011-10-27
has chosen to employ a variety of methods to generate power. In 2016 the country’s electrical generation mix included coal, natural gas, oil -based...12 percent, hydroelectric 9 percent, oil -based 6 percent, and biomass, solar, and wind-based generation methods each account for 1 percent of the...increased by 17 percent, and oil - based generation has decreased by 8 percent. During that same period, however, coal-based generation has increased
Wind-Driven Ecological Flow Regimes Downstream from Hydropower Dams
NASA Astrophysics Data System (ADS)
Kern, J.; Characklis, G. W.
2012-12-01
Conventional hydropower can be turned on and off quicker and less expensively than thermal generation (coal, nuclear, or natural gas). These advantages enable hydropower utilities to respond to rapid fluctuations in energy supply and demand. More recently, a growing renewable energy sector has underlined the need for flexible generation capacity that can complement intermittent renewable resources such as wind power. While wind power entails lower variable costs than other types of generation, incorporating it into electric power systems can be problematic. Due to variable and unpredictable wind speeds, wind power is difficult to schedule and must be used when available. As a result, integrating large amounts of wind power into the grid may result in atypical, swiftly changing demand patterns for other forms of generation, placing a premium on sources that can be rapidly ramped up and down. Moreover, uncertainty in wind power forecasts will stipulate increased levels of 'reserve' generation capacity that can respond quickly if real-time wind supply is less than expected. These changes could create new hourly price dynamics for energy and reserves, altering the short-term financial signals that hydroelectric dam operators use to schedule water releases. Traditionally, hourly stream flow patterns below hydropower dams have corresponded in a very predictable manner to electricity demand, whose primary factors are weather (hourly temperature) and economic activity (workday hours). Wind power integration has the potential to yield more variable, less predictable flows at hydro dams, flows that at times could resemble reciprocal wind patterns. An existing body of research explores the impacts of standard, demand-following hydroelectric dams on downstream ecological flows; but weighing the benefits of increased reliance on wind power against further impacts to ecological flows may be a novel challenge for the environmental community. As a preliminary step in meeting this challenge, the following study was designed to investigate the potential for wind power integration to alter riparian flow regimes below hydroelectric dams. A hydrological model of a three-dam cascade in the Roanoke River basin (Virginia, USA) is interfaced with a simulated electricity market (i.e. a unit commitment problem) representing the Dominion Zone of PJM Interconnection. Incorporating forecasts of electricity demand, hydro capacity and wind availability, a mixed-integer optimization program minimizes the system cost of meeting hourly demand and reserve requirements by means of a diverse generation portfolio (e.g. nuclear, fossil, hydro, and biomass). A secondary 'balancing' energy market is executed if real-time wind generation is less than the day-ahead forecast, calling upon reserved generation resources to meet the supply shortfall. Hydropower release schedules are determined across a range of wind development scenarios (varying wind's fraction of total installed generating capacity, as well as its geographical source region). Flow regimes for each wind development scenario are compared against both historical and simulated flows under current operations (negligible wind power), as well as simulated natural flows (dam removal), in terms of ecologically relevant flow metrics. Results quantify the ability of wind power development to alter within-week stream flows downstream from hydropower dams.
69. Credit TCL. Housing of Pelton exciter impulse wheel and ...
69. Credit TCL. Housing of Pelton exciter impulse wheel and attached General Electric 60 kW exciter generator. - Battle Creek Hydroelectric System, Battle Creek & Tributaries, Red Bluff, Tehama County, CA
Ultra-low-head hydroelectric technology: A review
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhou, Daqing; Deng, Zhiqun
In recent years, distributed renewable energy-generation technologies, such as wind and solar, have developed rapidly. Nevertheless, the utilization of ultra-low-head (ULH) water energy (i.e., situations where the hydraulic head is less than 3 m or the water flow is more than 0.5 m/s with zero head) has received little attention. We believe that, through technological innovations and cost reductions, ULH hydropower has the potential to become an attractive, renewable, and sustainable resource. This paper investigates potential sites for ULH energy resources, the selection of relevant turbines and generators, simplification of civil works, and project costs. This review introduces the currentmore » achievements on ULH hydroelectric technology to stimulate discussions and participation of stakeholders to develop related technologies for further expanding its utilization as an important form of renewable energy.« less
NASA Astrophysics Data System (ADS)
Delorme, Rolland
The generation of electrical energy in Quebec, estimated to 200 TWh, comes from hydroelectric generating stations for 96 % which are at the heart of provincial ecological and economic challenges. An important amount of research has been devoted to improving the hydrodynamic profile of hydraulic turbines to maximize their energy efficiency. However, few studies have focused on the draft tube in hydroelectric power plants, which is the duct where water flows out after crossing the turbine. Recent calculations performed by Alstom Power & Transport Canada Inc. revealed that the shape modulation of the draft tube could increase the hydroelectric generating station performance. The goal of this research was to assess the feasibility of this shape modification in existing draft tubes with inflatable composite membranes. The study consisted first of building an experimental setup to test the inflation of at membranes made up of a fiberglass-reinforced rubber composite. The inflated membranes were digitized with an optical equipment enabling 3D representations of their deflections. The second part of the study aimed at building finite element models reproducing the same experiments and enabling the design of more complicated membranes. The study confirmed the technical feasibility of designing and manufacturing such a membrane for the targeted application. However the large-scale roll-out will require to manufacture 3D membranes with the proper anchoring system. Keywords: reinforced rubber composite, reinforced elastomer composite, textile reinforcement, finite element modeling, mechanical behavior.
10. Turbine Pit of Unit 5, view to the north. ...
10. Turbine Pit of Unit 5, view to the north. Note the difference in configuration within this turbine pit as compared to one of the original pits illustrated in photograph number MT-105-A-11. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT
Estimated water use, by county, in North Carolina, 1990
Terziotti, Silvia; Schrader, Tony P.; Treece, M.W.
1994-01-01
Data on water use in North Carolina were compiled for 1990 as part of a cooperative agreement between the U.S. Geological Survey and the Division of Water Resources of the North Carolina Department of Environment, Health, and Natural Resources. Data were compiled from a number of Federal, State, and private sources for the offstream water-use categories of public supply, domestic, commercial, industrial, mining, livestock, irrigation, and thermoelectric-power generation. Data also were collected for instream use from hydroelectric facilities. Total estimated offstream water use in the State for 1990 was about 8,940 million gallons per day. About 95 percent of the water withdrawn was from surface-water sources. Thermoelectric-power generation accounted for about 81 percent of all withdrawals. Data for instream water use for hydroelectric-power generation also were compiled. This instream water use totaled about 66,900 million gallons per day. eAch water-use category is summarized in this report by county and source of water supply.
Modelisation de l'historique d'operation de groupes turbine-alternateur
NASA Astrophysics Data System (ADS)
Szczota, Mickael
Because of their ageing fleet, the utility managers are increasingly in needs of tools that can help them to plan efficiently maintenance operations. Hydro-Quebec started a project that aim to foresee the degradation of their hydroelectric runner, and use that information to classify the generating unit. That classification will help to know which generating unit is more at risk to undergo a major failure. Cracks linked to the fatigue phenomenon are a predominant degradation mode and the loading sequences applied to the runner is a parameter impacting the crack growth. So, the aim of this memoir is to create a generator able to generate synthetic loading sequences that are statistically equivalent to the observed history. Those simulated sequences will be used as input in a life assessment model. At first, we describe how the generating units are operated by Hydro-Quebec and analyse the available data, the analysis shows that the data are non-stationnary. Then, we review modelisation and validation methods. In the following chapter a particular attention is given to a precise description of the validation and comparison procedure. Then, we present the comparison of three kind of model : Discrete Time Markov Chains, Discrete Time Semi-Markov Chains and the Moving Block Bootstrap. For the first two models, we describe how to take account for the non-stationnarity. Finally, we show that the Markov Chain is not adapted for our case, and that the Semi-Markov chains are better when they include the non-stationnarity. The final choice between Semi-Markov Chains and the Moving Block Bootstrap depends of the user. But, with a long term vision we recommend the use of Semi-Markov chains for their flexibility. Keywords: Stochastic models, Models validation, Reliability, Semi-Markov Chains, Markov Chains, Bootstrap
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-07
..., Inc., Industrial Energy Consumer Group v. Bangor Hydro-Electric Company, Central Maine Power Company... Massachusetts Electric Company, Public Service Company of New Hampshire, NSTAR Electric & Gas Corporation, The United Illuminating Company, Unitil Energy [[Page 62397
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-14
... contain compact bulb turbines with individual unit capacities of 835 KW each and have a combined capacity... concrete powerhouse and intake in the northern two roller gate bays. The new proposed powerhouse would...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-29
.... d. Submitted by: Pacific Green Power, LLC. e. Name of Project: Two Girls Creek Hydroelectric Project. f. Location: On Two Girls Creek River, in Linn County, Washington. The project occupies United...
Comprehensive Renewable Energy Feasibility Study for Sealaska Corporation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robert Lynette; John Wade: Larry Coupe
2006-06-30
The purposes of this project were: (1) to conduct a comprehensive feasibility study to determine the potential sustainability of wind and/or small hydroelectric power plants on Southeast Alaska native village lands, and (2) to provide the villages with an understanding of the requirements, costs, and benefits of developing and operating wind or small hydroelectric power plants. The program was sponsored by the Tribal Energy program, Office of Energy Efficiency and Renewable Energy, US Department of Energy. The Contractor was Sealaska Corporation, the Regional Native Corporation for Southeast Alaska that includes 12 village/urban corporations. Most villages are isolated from any centralmore » electric transmission and use diesel-electric systems for power generation, making them prime candidates for deploying renewable energy sources. Wind Energy - A database was assembled for all of the candidate sites in SE Alaska, including location, demographics, electricity supply and demand, existing and planned transmission interties with central generation, topographical maps, macro wind data, and contact personnel. Field trips were conducted at the five candidate villages that were deemed most likely to have viable wind resources. Meetings were held with local village and utility leaders and the requirements, costs, and benefits of having local renewable energy facilities were discussed. Two sites were selected for anemometry based on their needs and the probability of having viable wind resources – Yakutat and Hoonah. Anemometry was installed at both sites and at least one year of wind resource data was collected from the sites. This data was compared to long-term data from the closest weather stations. Reports were prepared by meteorologist John Wade that contains the details of the measured wind resources and energy production projections. Preliminary financial analysis of hypothetical wind power stations were prepared to gauge the economic viability of installing such facilities at each site. The average wind resources measured at Yakutat at three sites were very marginal, with an annual average of 4.0 mps (9 mph) at 60 meters above ground level. At Hoonah, the average wind resources measured on the 1,417 ft elevation ridge above the village were very low, with a six-month average of 3.9 mps (8.7 mph) at 60 meters above ground level. The wind resources at both sites were not sufficient to justify installation of wind turbines. In summary, although there are several known windy spots in SE Alaska (e.g., Skagway), we were not able to identify any isolated Native American villages that utilize diesel-electric power generation that have commercially viable wind resources. Small Hydroelectric - The study focused on the communities associated with Sealaska Corporation that use diesel-electric for electricity and have a potential for hydroelectric power generation. Most of them have had at least an assessment of hydroelectric potential, and a few have had feasibility studies of potential hydroelectric projects. Although none of the sites examined are financially viable without substantial grant funding, Hoonah, Kake, and Yakutat appear to have the best potential for new hydro facilities.« less
3. Credit PEM. Interior of Martinsburg plant showing two MacIntousch ...
3. Credit PEM. Interior of Martinsburg plant showing two MacIntousch Seymore steam engines and one Taylor steam engine belt driving (from let to right) a sperry 30 light, 220 Volt generator, a Westinghouse 900 light, 2200 Volt generator, a Ball 80 light are generator, and two Edison, 900 light, 220 Volt generators. Note switchboard to left. Photo c. 1896. - Dam No. 4 Hydroelectric Plant, Potomac River, Martinsburg, Berkeley County, WV
11. Turbine Pit and Shaft of Unit 1, view to ...
11. Turbine Pit and Shaft of Unit 1, view to the south, with operating ring at base of shaft and servo motor arms in foreground and in left background recess. Turbine monitoring and auxiliary equipment is located in the rightbackground recess. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT
ERIC Educational Resources Information Center
Meyers, Paul A.; Witt, Frank C.
Presented is an analysis of alternatives available to the United States in dealing with energy problems. Options explained and evaluated include coal, solar, hydroelectric, nuclear, geothermal, wind, biomass, and energy conservation. The booklet is part of Project APEC (America's Possible Energy Choices), a nationally validated Title IVc project…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Huetter, J.J. Jr.
The overall feasibility of retrofit for hydroelectric power generation at the Patillas Reservoir, an existing impoundment located near the town of Patillas, Puerto Rico, was studied. The scope of work and project intent is limited to establishing valid acceptance or non-acceptance criteria for this specific site as an example of power generation potential at existing dams of relatively low head (less than or equal to 20 m) in the United States. Information is included on hydrologic conditions at the site, retrofit plant design, economic analysis, environmental, legal, social and institutional aspects, and availability of plant equipment. It is concluded thatmore » generation of hydropower at Patillas is entirely practical and uncomplicated from an engineering viewpoint, has no adverse environmental effects and is economically justifiable for the island of Puerto Rico. The final agency or contractor roles for development are reasonably well-established. There are no prohibitory laws or regulations concerning this development. In fact, according to Puerto Rico legislation, such hydropower developments appear to be mandated. The installed capacity of the site ranges from 665 kW to approximately 1500 kW depending on extent of development of the available options. (LCL)« less
View of east and south (rear) walls, water wheels and ...
View of east and south (rear) walls, water wheels and generators, interior of Childs Powerhouse. Looking southeast - Childs-Irving Hydroelectric Project, Childs System, Childs Powerhouse, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ
Percy Thomas wind generator designs
NASA Technical Reports Server (NTRS)
Lines, C. W.
1973-01-01
The technical and economic feasibilities of constructing a windpowered generator with a capacity of 2,000 to 4,000 kilowatt are considered. Possible benefits of an integrated wind generating electric energy source in an electric utility network are elaborated. Applications of a windpowered waterpump, including its use as a pumping source for hydroelectric pump storage operations, are also mentioned. It is concluded that the greatest potential of the wind generator is to generate heat directly and not conversion to electricity and then to heat.
NASA Astrophysics Data System (ADS)
Rogerio, J. P.; Dos Santos, M. A.; Matvienko, B.; dos Santos, E.; Rocha, C. H.; Sikar, E.; Junior, A. M.
2013-05-01
Widespread interest in human impacts on the Earth has prompted much questioning in fields of concern to the general public. One of these issues is the extent of the impacts on the environment caused by hydro-based power generation, once viewed as a clean energy source. From the early 1990s onwards, papers and studies have been challenging this assumption through claims that hydroelectric dams also emit greenhouse gases, generated by the decomposition of biomass flooded by filling these reservoirs. Like as other freshwater bodies, hydroelectric reservoirs produce gases underwater by biology decomposition of organic matter. Some of these biogenic gases are effective in terms of Global Warming. The decomposition is mainly due by anaerobically regime, emitting methane (CH4), nitrogen (N2) and carbon dioxide (CO2). This paper compare results obtained from gross greenhouse fluxes in Brazilian hydropower reservoirs with thermo power plants using different types of fuels and technology. Measurements were carried in the Manso, Serra da Mesa, Corumbá, Itumbiara, Estreito, Furnas and Peixoto reservoirs, located in Cerrado biome and in Funil reservoir located at Atlantic forest biome with well defined climatologically regimes. Fluxes of carbon dioxide and methane in each of the reservoirs selected, whether through bubbles and/or diffusive exchange between water and atmosphere, were assessed by sampling. The intensity of emissions has a great variability and some environmental factors could be responsible for these variations. Factors that influence the emissions could be the water and air temperature, depth, wind velocity, sunlight, physical and chemical parameters of water, the composition of underwater biomass and the operational regime of the reservoir. Based in this calculations is possible to conclude that the large amount of hydro-power studied is better than thermopower source in terms of atmospheric greenhouse emissions. The comparisons between the reservoirs studied shown a large variation in the data on greenhouse gas emissions, which would suggest that more care, should be taken in the choice of future projects by the Brazilian electrical sector. The emission of CH4 by hydroelectric reservoirs is always unfavorable, since even if the carbon has originated with natural sources, it is part of a gas with higher GWP in the final calculation. Emissions of CO2 can be attributed in part to the natural carbon cycle between the atmosphere and the water of the reservoir. Another part could be attributed to the decomposition of organic material, caused by the hydroelectric dam.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-22
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3730-005] Salmon Creek Hydroelectric Company, Salmon Creek Hydroelectric Company, LLC; Notice of Transfer of Exemption 1. By letter filed September 23, 2013, Salmon Creek Hydroelectric Company informed the Commission that they have...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-30
... maintained for Y HREA. the generation of electric power and uses for such generation only the hydroelectric... provision Description (Y/N) FPA 30(a)(3)(A), as amended by HREA.. The conduit the facility uses is a tunnel, canal, pipeline, Y aqueduct, flume, ditch, or similar manmade water conveyance that is operated for the...
Managing the Columbia Basin for Sustainable Economy, Society, Environment
The Columbia River Basin (CRB) is a vast region of the Pacific Northwest covering parts of the United States, Canada and Tribal lands. As the Columbia River winds its way from Canada into the US, the river passes through numerous multi-purpose reservoirs and hydroelectric genera...
NASA Astrophysics Data System (ADS)
Jidin, Razali; Othman, Bahari
2013-06-01
The lower Sg. Piah hydro-electric station is a river run-off hydro scheme with generators capable of generating 55MW of electricity. It is located 30km away from Sg. Siput, a small town in the state of Perak, Malaysia. The station has two turbines (Pelton) to harness energy from water that flow through a 7km tunnel from a small intake dam. The trait of a run-off river hydro station is small-reservoir that cannot store water for a long duration; therefore potential energy carried by the spillage will be wasted if the dam level is not appropriately regulated. To improve the station annual energy output, a new controller based on the computed river flow has been installed. The controller regulates the dam level with an algorithm based on the river flow derived indirectly from the intake-dam water level and other plant parameters. The controller has been able to maintain the dam at optimum water level and regulate the turbines to maximize the total generation output.
14. POWERHOUSE INTERIOR, EXCITER No. 2 SHOWING GENERAL ELECTRIC INDUCTION ...
14. POWERHOUSE INTERIOR, EXCITER No. 2 SHOWING GENERAL ELECTRIC INDUCTION MOTOR IN SERIES BETWEEN PELTON-DOBLE IMPULSE WHEEL AND GENERAL ELECTRIC GENERATOR. VIEW TO EAST. - Rush Creek Hydroelectric System, Powerhouse Exciters, Rush Creek, June Lake, Mono County, CA
View of Childs Powerhouse electrical panel and operator station. In ...
View of Childs Powerhouse electrical panel and operator station. In forground generator #2 and its exciter are visible. Looking north - Childs-Irving Hydroelectric Project, Childs System, Childs Powerhouse, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ
78 FR 47695 - Sam Rayburn Dam Power Rate
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-06
... replacements in the hydroelectric generating facilities and small increases to annual operations and... K. McDonald, Vice President for Corporate Operations/Chief Operating Officer, Southwestern Power... Code of Federal Regulations (18 CFR 300). Southwestern markets power from 24 multi-purpose reservoir...
NASA Astrophysics Data System (ADS)
Poirier, Marc; Gagnon, Martin; Tahan, Antoine; Coutu, André; Chamberland-lauzon, Joël
2017-01-01
In this paper, we present the application of cyclostationary modelling for the extrapolation of short stationary load strain samples measured in situ on hydraulic turbine blades. Long periods of measurements allow for a wide range of fluctuations representative of long-term reality to be considered. However, sampling over short periods limits the dynamic strain fluctuations available for analysis. The purpose of the technique presented here is therefore to generate a representative signal containing proper long term characteristics and expected spectrum starting with a much shorter signal period. The final objective is to obtain a strain history that can be used to estimate long-term fatigue behaviour of hydroelectric turbine runners.
Bello, Mufutau Opeyemi; Solarin, Sakiru Adebola; Yen, Yuen Yee
2018-08-01
The primary objective of this paper is to investigate the isolated impacts of hydroelectricity consumption on the environment in Malaysia as an emerging economy. We use four different measures of environmental degradation including ecological footprint, carbon footprint, water footprint and CO 2 emission as target variables, while controlling for GDP, GDP square and urbanization for the period 1971 to 2016. A recently introduced unit root test with breaks is utilized to examine the stationarity of the series and the bounds testing approach to cointegration is used to probe the long run relationships between the variables. VECM Granger causality technique is employed to examine the long-run causal dynamics between the variables. Sensitivity analysis is conducted by further including fossil fuels in the equations. The results show evidence of an inverted U-shaped relationship between environmental degradation and real GDP. Hydroelectricity is found to significantly reduce environmental degradation while urbanization is also not particularly harmful on the environment apart from its effect on air pollution. The VECM Granger causality results show evidence of unidirectional causality running from hydroelectricity and fossil fuels consumption to all measures of environmental degradation and real GDP per capita. There is evidence of feedback hypothesis between real GDP to all environmental degradation indices. The inclusion of fossil fuel did not change the behavior of hydroelectricity on the environment but fossil fuels significantly increase water footprint. Copyright © 2018 Elsevier Ltd. All rights reserved.
The Effect of Hydroelectric Power Plants (hpp) on Agro-Life at Rural Land Regulation in Turkey
NASA Astrophysics Data System (ADS)
Onursal Denli, G.; Denli, H. H.; Seker, D. Z.; Bitik, E.; Cetin, S.
2014-12-01
Turkey is one of the self-sufficient in foodstuffs and globally ranks as 7th significant agricultural exporter in the world. Main trading partners are the European Union, the United States and the Middle East. As known, agricultural production is dependent on factors including efficient and effective use of all inputs ranging from those natural resources as in land and water to well-trained human resources as labour at the production. The socio-economic aspects of this sector take several forms ranging from the incomes of the primary producers. Rural land regulation is a necessity for rural areas and is regarded as a useful instrument for improving farmer's incomes and life standards. The irrigation system, established during the rural regulation/land consolidation period of large-scale farming, is insufficiently adjusted to the new land tenure structures. The government is especially in the process of water management with hydroelectric power plants. This process produces energy that is required but effects negatively the rivers and agricultural, environmental, climatic conditions. Rivers are vessels of the nature. Free flowing rivers give life to all nature. Most of the studies indicate that Hydroelectric Power Plants (HPP) affects the surface and ground-water management, natural life, agricultural productivity, socio-economic situation at agricultural regions and agro-life related with immigration. This study emphasizes the effect of Hydroelectric Power Plants which are used in transformation of water as a renewable natural resource into electricity power from the perspective of environmental policies and rural regulation.
2. Photocopied from Photo 11456, Wheelon Station Special Folder, Engineering ...
2. Photocopied from Photo 11456, Wheelon Station Special Folder, Engineering Dept., Utah Power & Light Co., Salt Lake City, Utah. 'WHEELON HYDRO-ELECTRIC PLANT (7125 KW). INTERIOR OF MAIN BUILDING SHOWING FOUR 1000 KW UNITS. NOV 1914.' - Utah Sugar Company, Wheelon Hydoelectric Plant, Bear River, Fielding, Box Elder County, UT
Close up of backup exciter showing induction motor at left ...
Close up of backup exciter showing induction motor at left and direct current generator at right. View to west - Mystic Lake Hydroelectric Facility, Powerhouse, Along West Rosebud Creek, 1 3/4 miles northeast of Mystic Lake Dam, Fishtail, Stillwater County, MT
53. Photocopy of photograph, c. 1946. GENERAL INTERIOR VIEW OF ...
53. Photocopy of photograph, c. 1946. GENERAL INTERIOR VIEW OF GENERATOR ROOM. (Courtesy of the Potomac Edison Company Library (Hagerstown, MD), Historical Data Files, Dam No. 5 listing) - Dam No. 5 Hydroelectric Plant, On Potomac River, Hedgesville, Berkeley County, WV
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-16
...-wide by 20-foot-high reinforced concrete powerhouse, containing two 2.5-megawatt (MW) turbine/generator... feasibility of the proposed Lower Appleton Dam Hydroelectric Water Power Project No. 14389, to be located at...
PREFACE: The 27th IAHR Symposium on Hydraulic Machinery and Systems (IAHR 2014)
NASA Astrophysics Data System (ADS)
Désy, N.
2014-12-01
On behalf of the Organizing Committee and myself, it is my pleasure to welcome you to the 27th Symposium on Hydraulic Machinery and Systems. We are glad to welcome you in Montreal, Canada, in late September, just as the city welcomes the fall season and the trees start to show their nice colors. The Symposium will take place at the Hotel Omni Mont-Royal, located in the heart of the city. Participants will then have the opportunity to discover the many charms of Montreal, a rich blend between European and American cultures with diverse culinary offers and its legendary hospitality, nightlife and unique attractions. But other than the charm of Montreal, why are we holding it in Canada? · Canada is a world leader in hydropower production, with an installed capacity of over 70,000 megawatts (MW) and an annual average production of 350 terawatt-hours (TWh). · Thus, Canada is one of the world's largest producers of clean, renewable hydroelectric power. · Hydropower accounts for 97% of Canada's renewable electricity generation and nearly 13% of the world-wide production of hydropower, but with 0.5% of the world population. · Approximately 60% of the electricity generated in Canada in 2008 came from hydroelectric power plants. And there is the potential to more than double the hydroelectric capacity in Canada. Our Organizing Committee was formed in November 2011 and has undertaken a number of important steps to ensure that this event will be a success. We see this event as a very important one to help create personal networks and transfer knowledge to the younger generation of scientists. Bienvenue at our 2014 ''rendez-vous'' . Normand Désy Canadian Representative IAHR Executive Committee
Generating Excitement: Build Your Own Generator to Study the Transfer of Energy
ERIC Educational Resources Information Center
Fletcher, Kurt; Rommel-Esham, Katie; Farthing, Dori; Sheldon, Amy
2011-01-01
The transfer of energy from one form to another can be difficult to understand. The electrical energy that turns on a lamp may come from the burning of coal, water falling at a hydroelectric plant, nuclear reactions, or gusts of wind caused by the uneven heating of the Earth. The authors have developed and tested an exciting hands-on activity to…
2012-04-01
certain energy related military construction projects. The Navy used this authority for its geothermal plant at Naval Air Weapons Station China Lake...electric energy generated from solar, wind, biomass, landfill gas, ocean (including tidal, wave, current, and thermal), geothermal , municipal solid...thermal; geothermal , including electricity and heat pumps; municipal solid waste; new hydroelectric generation capacity achieved from increased
4. Unit 4 Turbine Pit Oil Jacking Pump and Wicket ...
4. Unit 4 Turbine Pit Oil Jacking Pump and Wicket Gate Linkages, view to the north. The jacking pump, located along the wall on the left side of photograph, is used for pumping oil to lift the thrust bearing prior to starting the unit. Note the wicket gate linkages attached to the operating ring and visible in the lower center of the photograph. - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID
Watering Down Barriers to Using Hydropower through Fisheries Research
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ham, Ken
Much of our work on clean energy is targeted at improving performance of hydropower, the largest source of renewable energy in the Pacific Northwest and the nation. PNNL experts in hydropower—from computer scientists to biologists and engineers—are helping to optimize the efficiency and environmental performance of hydroelectric plants. The Columbia River is the nation’s most important hydropower resource, producing 40 percent of the nation’s hydroelectric generation and up to 70 percent of the region’s power. At PNNL, Fisheries Biologist Ken Ham and others are working with stakeholders in the Pacific Northwest, the Army Corps of Engineers and DOE to ensuremore » that this resource continues to provide its many benefits while setting a new standard for environmental sustainability. As aging turbines are replaced in existing hydropower dams, computational modeling and state-of-the-art fisheries research combine to aid the design of a next-generation hydro turbine that meets or exceeds current biological performance standards and produces more power.« less
Code of Federal Regulations, 2010 CFR
2010-04-01
... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act. (a...
Code of Federal Regulations, 2014 CFR
2014-04-01
... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act. (a...
Code of Federal Regulations, 2013 CFR
2013-04-01
... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act. (a...
Code of Federal Regulations, 2012 CFR
2012-04-01
... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act. (a...
Code of Federal Regulations, 2011 CFR
2011-04-01
... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act. (a...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-12-31
This legislation grants a 5 year waiver on the payment of fees for the use of lands for the operating and maintaining of a hydroelectric development licensed by the Federal Energy Regulatory Commission, to any political subdivision of the state of Montana which takes the license, for FERC project 1473. Following the 5 year period the licensee would be required to pay the lesser of $20,000 or the annual charge for the use of the land imposed by any department or agency of the Federal Government.
78 FR 6319 - Eastern Hydroelectric Corporation; Notice Rejecting Request for Rehearing
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-30
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7019-068] Eastern... an order amending license Article 401 for Eastern Hydroelectric Corporation's (Eastern Hydroelectric....\\1\\ On January 11, 2013, Eastern Hydroelectric filed a request for rehearing of Commission staff's...
Estimated water withdrawals and use in Pennsylvania, 1995
Ludlow, Russell A.; Gast, William A.
2000-01-01
In practical terms, water use is divided into two basic types: instream use and offstream use. Instream use is water used in its natural channel, basin, or behind a dam and includes activities such as fishing, boating, and other recreational activities. Instream use also includes hydroelectric power generation. Off-stream use is water pumped or diverted from its natural channel, basin, or aquifer. Off-stream uses are divided into the following categories: public supply, domestic, commercial, industrial, thermoelectric power, mining, livestock, and irrigation. This fact sheet provides an overview of offstream and hydroelectric power water use in Pennsylvania. It describes water withdrawals by source, water withdrawals and deliveries by category, changes in water use over time, and water-management responsibilities in the State.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-02-01
The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced bymore » Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Salt Lake City Area Office of the Western Area Power Administration (Western) markets electricity produced at hydroelectric facilities operated by the Bureau of Reclamation. The facilities are known collectively as the Salt Lake City Area Integrated Projects (SLCA/IP) and include dams equipped for power generation on the Green, Gunnison, Rio Grande, and Colorado rivers and on Deer and Plateau creeks in the states of Wyoming, Utah, Colorado, Arizona, and New Mexico. Of these facilities, only the Glen Canyon Unit, the Flaming Gorge Unit, and the Aspinall Unit (which includes Blue Mesa, Morrow Point, and Crystal dams;) are influenced bymore » Western power scheduling and transmission decisions. The EIS alternatives, called commitment-level alternatives, reflect combinations of capacity and energy that would feasibly and reasonably fulfill Westerns firm power marketing responsibilities, needs, and statutory obligations. The viability of these alternatives relates directly to the combination of generation capability of the SLCA/IP with energy purchases and interchange. The economic and natural resource assessments in this environmental impact statement (EIS) include an analysis of commitment-level alternatives. Impacts of the no-action alternative are also assessed. Supply options, which include combinations of electrical power purchases and hydropower operational scenarios reflecting different operations of the dams, are also assessed. The EIS evaluates the impacts of these scenarios relative to socioeconomics, air resources, water resources, ecological resources, cultural resources, land use, recreation, and visual resources.« less
28. Photocopy of microfiched construction drawing by Pelton Water Wheel ...
28. Photocopy of microfiched construction drawing by Pelton Water Wheel Company, San Francisco, California, dated May 6, 1947. (Microfiched drawing located at the Denver Service Center, #104/601 54 - 2 of 18) LONGITUDINAL SECTION OF RECONSTRUCTED TURBINE UNIT NO. 2 - Yosemite Hydroelectric Power Plant, Highways 120 & 140, Yosemite Village, Mariposa County, CA
The report describes the results of pollution prevention opportunity assessments conducted at a representative U.S. Army Corps of Engineers civil works dam and hydroelectric power plant. ecommended methods for reducing pollution resulting primarily from the operation of these fac...
75 FR 81643 - Hydropower Resource Assessment at Existing Reclamation Facilities-Draft Report
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-28
[email protected] . The Draft Report is also accessible from the following Web site: http://www.usbr.gov/power... or about 48.4 billion pounds of coal. Reclamation is the second largest producer of hydroelectric power in the United States, and is actively engaged in looking for opportunities to encourage...
18 CFR 4.94 - Standard terms and conditions of exemption.
Code of Federal Regulations, 2013 CFR
2013-04-01
..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.94... exempt project must comply with any terms and conditions that the United States Fish and Wildlife Service... exemption from licensing for the same project within two years of the revocation. (d) Article 4. In order to...
18 CFR 4.94 - Standard terms and conditions of exemption.
Code of Federal Regulations, 2014 CFR
2014-04-01
..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.94... exempt project must comply with any terms and conditions that the United States Fish and Wildlife Service... exemption from licensing for the same project within two years of the revocation. (d) Article 4. In order to...
18 CFR 4.94 - Standard terms and conditions of exemption.
Code of Federal Regulations, 2012 CFR
2012-04-01
..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.94... exempt project must comply with any terms and conditions that the United States Fish and Wildlife Service... exemption from licensing for the same project within two years of the revocation. (d) Article 4. In order to...
33 CFR 207.440 - St. Marys Falls Canal and Locks, Mich.; use, administration, and navigation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... United States part and other lands, piers, buildings, water level regulation works, hydroelectric power plant, and other appurtenances acquired or constructed for the channel improvement and use of the...) Manning requirements. On all vessels of 400 gross tons or over navigating the canal under their own power...
33 CFR 207.440 - St. Marys Falls Canal and Locks, Mich.; use, administration, and navigation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... United States part and other lands, piers, buildings, water level regulation works, hydroelectric power plant, and other appurtenances acquired or constructed for the channel improvement and use of the...) Manning requirements. On all vessels of 400 gross tons or over navigating the canal under their own power...
ERIC Educational Resources Information Center
Johnston, Robert C.
2005-01-01
During a volunteer stint on a hydroelectric-power project in the mountains of Honduras in 1996, William DeJong began "the walk." As the president of DeJong Inc., one of the top school facility planners in the United States, he wanted to study the conditions of schools in the rugged Central American countryside far from his home in…
11. Station Accumulator Tanks, view to the northeast. The tanks ...
11. Station Accumulator Tanks, view to the northeast. The tanks are visible along the right side of photograph, opposite a wall of the Unit 1 turbine pit. - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-08
... Acquisition and Easements, Hydraulics and Hydrology, Water Rights, Project Features and Design, Power... Federal water resource projects, Reclamation will consider proposals for non-Federal development of... part of the Klamath Project, the United States constructed A, B, and C-Canals, which carry water south...
WTS-4 system verification unit for wind/hydroelectric integration study
NASA Technical Reports Server (NTRS)
Watts, A. W.
1982-01-01
The Bureau of Reclamation (Reclamation) initiated a study to investigate the concept of integrating 100 MW of wind energy from megawatt-size wind turbines with the Federal hydroelectric system. As a part of the study, one large wind turbine was purchased through the competitive bid process and is now being installed to serve as a system verification unit (SVU). Reclamation negotiated an agreement with NASA to provide technical management of the project for the design, fabrication, installation, testing, and initial operation. Hamilton Standard was awarded a contract to furnish and install its WTS-4 wind turbine rated at 4 MW at a site near Medicine Bow, Wyoming. The purposes for installing the SVU are to fully evaluate the wind/hydro integration concept, make technical evaluation of the hardware design, train personnel in the technology, evaluate operation and maintenance aspects, and evaluate associated environmental impacts. The SVU will be operational in June 1982. Data from the WTS-4 and from a second SVU, Boeing's MOD-2, will be used to prepare a final design for a 100-MW farm if Congress authorizes the project.
Comprehensive Renewable Energy Feasibility Study for the Makah Indian Tribe
DOE Office of Scientific and Technical Information (OSTI.GOV)
RobertLynette; John Wade; Larry Coupe
The purpose of this project was to determine the technical feasibility, economic viability, and potential impacts of installing and operating a wind power station and/or small hydroelectric generation plants on the Makah reservation. The long-term objective is to supply all or a portion of Tribe's electricity from local, renewable energy sources in order to reduce costs, provide local employment, and reduce power outages. An additional objective was for the Tribe to gain an understanding of the requirements, costs, and benefits of developing and operating such plants on the reservation. The Makah Indian Reservation, with a total land area of forty-sevenmore » square miles, is located on the northwestern tip of the Olympic Peninsula in Washington State. Four major watersheds drain the main Reservation areas and the average rainfall is over one hundred inches per year. The reservation's west side borders the Pacific Ocean, but mostly consists of rugged mountainous terrain between 500 and 1,900 feet in elevation. Approximately 1,200 tribal members live on the Reservation and there is an additional non-Indian residential population of about 300. Electric power is provided by the Clallam County PUD. The annual usage on the reservation is approximately 16,700 mWh. Project Work Wind Energy--Two anemometer suites of equipment were installed on the reservation and operated for a more than a year. An off-site reference station was identified and used to project long-term wind resource characteristics at the two stations. Transmission resources were identified and analyzed. A preliminary financial analysis of a hypothetical wind power station was prepared and used to gauge the economic viability of installation of a multi-megawatt wind power station. Small Hydroelectric--Two potential sites for micro/small-hydro were identified by analysis of previous water resource studies, topographical maps, and conversations with knowledgeable Makah personnel. Field trips were conducted to collect preliminary site data. A report was prepared by Alaska Power & Telephone (Larry Coupe) including preliminary layouts, capacities, potential environmental issues, and projected costs. Findings and Conclusions Wind Energy The average wind resources measured at both sites were marginal, with annual average wind speeds of 13.6-14.0 mph at a 65-meter hub height, and wind shears of 0.08-0.13. Using GE 1.5 MW wind turbines with a hub height of 65 meters, yields a net capacity factor of approximately 0.19. The cost-of-energy for a commercial project is estimated at approximately 9.6 cents per kWh using current costs for capital and equipment prices. Economic viability for a commercial wind power station would require a subsidy of 40-50% of the project capital cost, loans provided at approximately 2% rate of interest, or a combination of grants and loans at substantially below market rates. Recommendations: Because the cost-of-energy from wind power is decreasing, and because there may be small pockets of higher winds on the reservation, our recommendation is to: (1) Leave one of the two anemometer towers, preferably the 50-meter southern unit MCC, in place and continue to collect data from this site. This site would serve as an excellent reference anemometer for the Olympic Peninsula, and, (2) If funds permit, relocate the northern tower (MCB) to a promising small site closer to the transmission line with the hope of finding a more energetic site that is easier to develop. Small Hydroelectric There are a very limited number of sites on the reservation that have potential for economical hydroelectric development, even in conjunction with water supply development. Two sites emerged as the most promising and were evaluated: (1) One utilizing four creeks draining the north side of the Cape Flattery peninsula (Cape Creeks), and (2) One on the Waatch River to the south of Neah Bay. The Cape Creeks site would be a combination water supply and 512 kW power generation facility and would cost a approximately $11,100,000. Annual power generation would be approximately 1,300,000 kWh and the plant would have a cost-of-energy of approximately 65 cents per kWh, substantially above market rates. The Waatch site would also be a combination water supply and power generation facility. It would have a rated capacity of 935 kW and would cost approximately $16,400,000. Annual power generation would be approximately 3,260,000 kWh and the plant would have a cost-of-energy of approximately 38 cents per kWh, also substantially above market rates. Recommendation: Stand-alone hydroelectric development is not commercially viable. The Tribal Council should not pursue development of hydroelectric facilities on the Makah Reservation unless they are an adjunct to a water supply development, and the water supply systems absorbs almost all the capital cost of the project.« less
4. Credit PEM. Interior of Martinsburg Plant; on right showing ...
4. Credit PEM. Interior of Martinsburg Plant; on right showing Taylor 150 hp steam engine belt-connected to a Warren 150 KW, 2200 Volt a.c. generator. On left, a Fisher 400 hp steam engine belt-connected to a Warren 200 KW, 2200 Volt a.c. generator. In center, also belt-connected to Fisher 400 hp engine is a Bail 120 light, arc-light generator. Photo c. 1905. - Dam No. 4 Hydroelectric Plant, Potomac River, Martinsburg, Berkeley County, WV
Electric Power Monthly, August 1990. [Glossary included
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1990-11-29
The Electric Power Monthly (EPM) presents monthly summaries of electric utility statistics at the national, Census division, and State level. The purpose of this publication is to provide energy decisionmakers with accurate and timely information that may be used in forming various perspectives on electric issues that lie ahead. Data includes generation by energy source (coal, oil, gas, hydroelectric, and nuclear); generation by region; consumption of fossil fuels for power generation; sales of electric power, cost data; and unusual occurrences. A glossary is included.
Young, Loyd L.
1964-01-01
Estimates of potential waterpower and historical data on waterpower developments in various parts of the world are assembled in this report. Salient characteristics of the period studied, 1955-62, include increased use of the underground powerhouse, multiple -purpose developments, and use of storage (including pumped storage) to increase the value of waterpower for peaking purposes. High-voltage long-distance transmission has been improved, especially in the United States, Sweden, and the U.S.S.R., and generating facilities tend to be larger than ever before. Asia leads the continents in total potential waterpower; Europe is first in use of waterpower. In rate of increase of waterpower installations and in percent of hydroelectric to total installations Africa is first among the continents. The 1955-62 period saw a great increase in per capita consumption of electric energy. Norway leads all countries with annual consumption of about 9,000 kwhr per capita. Waterpower development was carried on in a majority of the countries of the world and in most of them at an accelerated rate.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-16
... Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake, MT AGENCY: Bureau of Indian... Impact Statement (FEIS) for Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake... drought management planning at the Kerr Hydroelectric Project no sooner than 30 days following the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-29
... Alabama] Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted... by issuance of a new license for the Bartletts Ferry Hydroelectric Project No. 485. The programmatic... Hydroelectric Project. On June 14, 2012, the Kialegee Tribal Town requested a revision to the restricted service...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-01
... Associates, Inc.; Salmon Creek Hydroelectric Company; Notice of Transfer of Exemption 1. By letter filed April 18, 2013, Henwood Associates, Inc. and Salmon Creek Hydroelectric Company informed the Commission that the exemption from licensing for the Salmon Creek Hydroelectric Project, FERC No. 3730, originally...
NASA Astrophysics Data System (ADS)
Uppal, Charu
Our perception of and relationship with our natural environment is shaped by the dominant cultural perspectives held toward the environment. This comparative study is based on the assumption that there is a marked difference between these cultural perspectives in India and the United States, and because journalists carry cultural notions to the newsroom, these differences are likely to surface in media coverage of environmental issues. Considering environmental activism opposing large hydroelectric projects as one example of environmental news, this study examines the emergence of cultural differences in the print media in India and the United States. Contextual analysis was used to analyze two Indian newspapers (The Times of India and The Hindu) and two U.S. newspapers (The New York Times and The Buffalo News) in the environmental cultural context of their respective countries. Environmental activism was measured by examining two aspects of the news coverage: mobilizing information and appeals. Provision of mobilizing information was considered an indication of newspapers' emphasis on citizen involvement. The study demonstrates that there indeed is a difference in the way environmental news, as it relates to the hydroelectric projects is covered in the United States and in India. Some of the key findings of the study are: (1) Indian newspapers provided much more detailed and frequent coverage of the struggle against hydroelectric projects than their U.S. counterparts, (2) Mobilizing information was provided often and at varied levels, which could potentially cater to audiences with diverse political orientations. The study revealed varying kinds of mobilizing information not discussed in earlier research on mobilizing information. Two previously unidentified types of MI were labeled invitational and empowering. Invitational mobilizing information seemed more useful for motivating the audience to get involved. Empowering MI was mainly useful for those who were already involved either in the same or similar issues.
Rous, Andrew M.; McLean, Adrienne R.; Barber, Jessica; Bravener, Gale; Castro-Santos, Theodore; Holbrook, Christopher M.; Imre, Istvan; Pratt, Thomas C.; McLaughlin, Robert L.
2017-01-01
Crucial to the management of invasive species is understanding space use and the environmental features affecting space use. Improved understanding of space use by invasive sea lamprey (Petromyzon marinus) could help researchers discern why trap success in large rivers is lower than needed for effective control. We tested whether manipulating discharge nightly could increase trap success at a hydroelectric generating station on the St. Marys River. We quantified numbers of acoustically tagged sea lampreys migrating up to, and their space use at, the hydroelectric generating station. In 2011 and 2012, 78% and 68%, respectively, of tagged sea lampreys reached the generating station. Sea lampreys were active along the face, but more likely to occur at the bottom and away from the traps near the surface, especially when discharge was high. Our findings suggest that a low probability of encountering traps was due to spatial (vertical) mismatch between space use by sea lamprey and trap locations and that increasing discharge did not alter space use in ways that increased trap encounter. Understanding space use by invasive species can help managers assess the efficacy of trapping and ways of improving trapping success.
9. Photocopied August 1971 from Photo 13730, Granite Folder #1, ...
9. Photocopied August 1971 from Photo 13730, Granite Folder #1, Engineering Department, Utah Power and Light Co., Salt Lake City, Utah. GRANITE STATION: WESTINGHOUSE 750 K.V.A., 2- PHASE GENERATORS AND SWITCHBOARD, MAY 24, 1915. - Utah Power Company, Granite Hydroelectric Plant, Holladay, Salt Lake County, UT
Hydrology of Bishop Creek, California: An Isotopic Analysis
Michael L. Space; John W. Hess; Stanley D. Smith
1989-01-01
Five power generation plants along an eleven kilometer stretch divert Bishop Creek water for hydro-electric power. Stream diversion may be adversely affecting the riparian vegetation. Stable isotopic analysis is employed to determine surface water/ground-water interactions along the creek. surface water originates primarily from three headwater lakes. Discharge into...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-13
...) solar power; (9) wind power; (10) biomass waste; (11) hydroelectric power; (12) ocean wave and current... Nuclear Plants AGENCY: Nuclear Regulatory Commission. ACTION: Final Supplement 47 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants; issuance. SUMMARY: Notice is hereby given...
Power-poor nation taps jungle river for energy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-12-13
The Paute River 1,690-MW hydroelectric power project near Cuenca will triple the power generating capacity of Ecuador. Progress on this practically inaccessible site is reported. The centerpiece will be the 560-ft-high Amaluza Dam. The underground powerhouse is slated to come on line in 1982.
Code of Federal Regulations, 2012 CFR
2012-04-01
... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... the Federal Power Act, at which non-Federal hydroelectric development is permissible; or (2) An...
VERTICAL DETAIL OBLIQUE VIEW OF NORTHEAST SIDE OF HYDROELECTRIC POWER ...
VERTICAL DETAIL OBLIQUE VIEW OF NORTHEAST SIDE OF HYDROELECTRIC POWER HOUSE WITH OLD BYPASS IN FOREGROUND, SHOWING GLASS BLOCKS PROVIDING LIGHT TO BASEMENT OF HYDROELECTRIC POWER HOUSE, VIEW TOWARDS WEST SOUTHWEST - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL
Code of Federal Regulations, 2013 CFR
2013-04-01
... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... the Federal Power Act, at which non-Federal hydroelectric development is permissible; or (2) An...
OBLIQUE VIEW OF SOUTHWEST AND SOUTHEAST SIDES OF HYDROELECTRIC POWER ...
OBLIQUE VIEW OF SOUTHWEST AND SOUTHEAST SIDES OF HYDROELECTRIC POWER HOUSE WITH DAM TO LEFT OF HYDROELECTRIC POWER HOUSE AND ENTRANCE TO OLD LOCK CHAMBER ON RIGHT, VIEW TOWARDS NORTH - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL
Code of Federal Regulations, 2014 CFR
2014-04-01
... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... the Federal Power Act, at which non-Federal hydroelectric development is permissible; or (2) An...
International energy annual 1997
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
The International Energy Annual presents an overview of key international energy trends for production, consumption, imports, and exports of primary energy commodities in over 220 countries, dependencies, and areas of special sovereignty. Also included are population and gross domestic product data, as well as prices for crude oil and petroleum products in selected countries. Renewable energy reported in the International Energy Annual includes hydroelectric power and geothermal, solar, and wind electric power. Also included are biomass electric power for Brazil and the US, and biomass, geothermal, and solar energy produced in the US and not used for electricity generation. Thismore » report is published to keep the public and other interested parties fully informed of primary energy supplies on a global basis. The data presented have been largely derived from published sources. The data have been converted to units of measurement and thermal values (Appendices E and F) familiar to the American public. 93 tabs.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Abernethy, C. Scott; Neitzel, Duane A.; Lusty, E. William
The Bonneville Power Administration (BPA), the United States Bureau of Reclamation (USSR), and the Washington State Department of Ecology (WDOE) are funding the construction and evaluation of fish passage facilities and fish protection facilities at irrigation and hydroelectric diversions in the Yakima River Basin, Washington State. The program provides offsite enhancement to compensate for fish and wildlife losses caused by hydroelectric development throughout the Columbia River Basin, and addresses natural propagation of salmon to help mitigate the impact of irrigation in the Yakima River Basin. This report evaluates the flow characteristics of the screening facilities. Studies consisted of velocity measurementsmore » taken in front of the rotary drum screens and within the fish bypass systems during peak flows. Measurements of approach velocity and sweep velocity were emphasized in these studies; however, vertical velocity was also measured. 5 refs., 18 figs., 15 tabs.« less
43 CFR 2320.1 - Lands considered withdrawn or classified for power purposes.
Code of Federal Regulations, 2012 CFR
2012-10-01
... hydroelectric power permits under the Act of February 15, 1901 (43 U.S.C. 959); and lands within transmission... for power purposes. 2320.1 Section 2320.1 Public Lands: Interior Regulations Relating to Public Lands... for power purposes. The following classes of lands of the United States are considered as withdrawn or...
43 CFR 2320.1 - Lands considered withdrawn or classified for power purposes.
Code of Federal Regulations, 2011 CFR
2011-10-01
... hydroelectric power permits under the Act of February 15, 1901 (43 U.S.C. 959); and lands within transmission... for power purposes. 2320.1 Section 2320.1 Public Lands: Interior Regulations Relating to Public Lands... for power purposes. The following classes of lands of the United States are considered as withdrawn or...
43 CFR 2320.1 - Lands considered withdrawn or classified for power purposes.
Code of Federal Regulations, 2013 CFR
2013-10-01
... hydroelectric power permits under the Act of February 15, 1901 (43 U.S.C. 959); and lands within transmission... for power purposes. 2320.1 Section 2320.1 Public Lands: Interior Regulations Relating to Public Lands... for power purposes. The following classes of lands of the United States are considered as withdrawn or...
43 CFR 2320.1 - Lands considered withdrawn or classified for power purposes.
Code of Federal Regulations, 2014 CFR
2014-10-01
... hydroelectric power permits under the Act of February 15, 1901 (43 U.S.C. 959); and lands within transmission... for power purposes. 2320.1 Section 2320.1 Public Lands: Interior Regulations Relating to Public Lands... for power purposes. The following classes of lands of the United States are considered as withdrawn or...
A comparison of a technical and a participatory application of social impact assessment.
Dennis R Becker; Charles C Harris; Erik A Nielsen; William J. McLaughlin
2004-01-01
Results of independent applications of a technical and a participatory approach to SIA are compared for an assessment of impacts of the proposed removal of hydroelectric dams to recover threatened and endangered salmon in the Pacific Northwest of the United States. The analysis focuses on empirical differences and similarities between the technical social analysis...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-12
... Filed: November 16, 2011. d. Submitted By: Free Flow Power Corporation on behalf of its subsidiary limited liability corporations (listed above and collectively referred to below as ``Free Flow Power''). e... would occupy United States lands administered by the U.S. Army Corps of Engineers. Project No. Projects...
Code of Federal Regulations, 2013 CFR
2013-04-01
... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... requirements for hydroelectric small power production facilities located at a new dam or diversion. (a) A hydroelectric small power production facility that impounds or diverts the water of a natural watercourse by...
Code of Federal Regulations, 2014 CFR
2014-04-01
... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... requirements for hydroelectric small power production facilities located at a new dam or diversion. (a) A hydroelectric small power production facility that impounds or diverts the water of a natural watercourse by...
Code of Federal Regulations, 2012 CFR
2012-04-01
... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... requirements for hydroelectric small power production facilities located at a new dam or diversion. (a) A hydroelectric small power production facility that impounds or diverts the water of a natural watercourse by...
NASA Astrophysics Data System (ADS)
Forrest, K.; Tarroja, B.; AghaKouchak, A.; Chiang, F.; Samuelsen, S.
2017-12-01
Spatial and temporal shifts in hydrological regimes predicted under climate change conditions have implications for the management of reservoirs and hydropower contributions to generation and ancillary services. California relies on large hydropower plants to provide flexible electricity generation, which will be increasingly important for supporting renewable resources. This study examines the impact of climate change on large hydropower generation in California. Four climate models for Representative Concentration Pathways (RCP) 4.5 and RCP 8.5 are utilized to evaluate the impact of the climate change conditions on (1) the magnitude and profile of hydropower generation and (2) the ability of hydropower to provide spinning reserve. Under both RCP scenarios, impacts are regionally dependent, with precipitation projected to increase in northern California and decrease in southern California for the ten-year period investigated (2046-2055). The overall result is a net increase in inflow into large hydropower units as a majority of the hydropower plants studied are located in the northern part of the state. Increased inflow is primarily driven by increased runoff during the winter and does not necessarily result in increased generation, as extreme events yield greater overall spillage, up to 45% of total inflow. Increased winter hydropower generation paired with increased reservoir constraints in summer result in an 11 to 18% decrease in spinning reserve potential across the year. Under high inflow conditions there is a decreased flexibility for choosing generation versus spinning reserve as water needs to be released, regardless. During summer, hydropower units providing spinning reserve experienced decreased inflow and lower reservoir levels compared to the historical baseline, resulting in decreased spinning reserve bidding potential. Decreased bidding, especially during summer periods at peak electricity demand, can result in greater demand for other dispatchable resources, such as natural gas turbines or emerging energy storage technologies, which has implications for electricity costs and overall grid emissions.
NASA Astrophysics Data System (ADS)
Goyal, R.; Gandhi, B. K.; Cervantes, M. J.
2018-06-01
Increased penetration of solar and the wind impels the designers of the hydroelectric power generation unit to provide more flexibility in operation for the stability of the grid. The power generating unit includes turbine which needs to sustain sudden change in its operating conditions. Thus, the hydraulic turbine experiences more transients per day which result in chronic problems such as fatigue to the runner, instrument malfunctioning, vibrations, wear and tear etc. This paper describes experiments performed on a high model (1.5:1) Francis turbine for load acceptances from the minimum load. The experiments presented in the paper are the part of Francis-99 workshop which aims to determine the performance of numerical models in simulations of model Francis turbine under steady and transient operating conditions. The aim of the paper is to present the transient pressure variation in the vaneless space of a Francis turbine where high-frequency pulsations are normally expected. For this, two pressure sensors, VL1 and VL2, are mounted at the vaneless space, one near the beginning of the spiral casing and the other before the end of the spiral casing. Both are used to capture the unsteady pressure field developed in the space between guide vanes and runner inlet. The time-resolved pressure signals are analyzed and presented during the transient to observe the pressure variation and dominant frequencies of pulsations.
Systematic Sustainability Assessment (SSA) Tool for Hydroelectric Project in Malaysia
NASA Astrophysics Data System (ADS)
Turan, Faiz Mohd; Johan, Kartina
2017-08-01
Sustainably developed and managed hydropower has enormous potential to contribute to global sustainability goals. It is known that hydroelectricity contributing small amounts to greenhouse gas emissions and other atmospheric pollutants. However, developing the remaining hydroelectric potential offers many challenges, and public pressure and expectations on the environmental and social performance of hydroelectric tend to increase over time. This paper aims to develop Systematic Sustainability Assessment (SSA) Tool that promotes and guides more sustainable hydroelectric projects in the context of Malaysia. The proposed SSA tool which not only provide a quality and quantitative report of sustainability performance but also act as Self-Assessment Report (SAR) to provide roadmap to achieve greater level of sustainability in project management for continuous improvement. It is expected to provide a common language that allow government, civil society, financial institutions and the hydroelectric sector to talk about and evaluate sustainability issues. The advantage of SSA tool is it can be used at any stage of hydroelectric development, from the earliest planning stages right through to operation.
Drought Impacts on Reservoir Storage and Hydro-electricity Production in Southeastern Brazil
NASA Astrophysics Data System (ADS)
Scanlon, B. R.; Melo, D. D.; Yin, L.; Wendland, E.
2015-12-01
Brazilian hydroelectric plants (HP) generate ~85% of the total electricity in the country (138 GW). More than half of the number largest reservoirs are located in the Southeast/Midwest region, where ~50% of the population (~100 million) lives. The 2014 drought raised several questions about the resilience of the water sources when several urban centers, including Brazilian's largest metropolis (São Paulo, 20 million people), had their water supply threatened. Such drought also affected reservoirs of hydroelectric plants. This study assesses how the storage and, thus the electricity generation, in 14 of the largest reservoirs were affected by drought events within the past 20 years. We computed the Standardized Precipitation Index (SPI) to identify rainfall anomalies throughout the analyzed period. To evaluate the impacts on surface water, we assessed the changes in total (surface+ subsurface) runoff and soil moisture from Global Land Data Assimilation System (GLDAS) and in Total Water Storage (TWS) from Gravity Recovery and Climate Experiment (GRACE) satellite data. We evaluated the anomalies and significance of the changes in reservoir storage (RS) and electricity generation. The results show that severe dry years (-1.5 < SPI <-2.0) reduce reservoir storage (RS) by up to ~60% of its total capacity. Both electricity generation and reservoir storage showed strong negative trends between 2011 and 2014. Our results also indicate that within the past 20 years, two major depletions in reservoir storage occurred: 2001 and 2014. However, due to lower soil moisture in 2013 compared to that in 2000, distinct impacts were observed on the reservoirs with much stronger impacts on reservoir storage in 2014 relative to those in 2001. No meaningful changes in runoff were shown by GLDAS during the 2014 drought. The observed depletion in the RS in 2014 was similar to that in the TWS, as shown by GRACE data. In 2014, the electricity production by the HP declined by ~20%. As a result, the electricity generated by such source decreased to ~70% of the total production, compared to 82% and 93% in 2013 and 2012, respectively. This analysis highlights the vulnerability of surface water resources and electricity generation to extreme droughts and underscores the need to develop coping mechanisms to enhance drought resilience in the future.
18 CFR 35.12 - Filing of initial rate schedules and tariffs.
Code of Federal Regulations, 2013 CFR
2013-04-01
... integration of hydroelectric generating resources whose output cannot be predicted quantitatively due to water... explanation of how the proposed rate or charge was derived. For example, is it a standard rate of the filing public utility; is it a special rate arrived at through negotiations and, if so, were unusual customer...
18 CFR 35.12 - Filing of initial rate schedules and tariffs.
Code of Federal Regulations, 2014 CFR
2014-04-01
... integration of hydroelectric generating resources whose output cannot be predicted quantitatively due to water... explanation of how the proposed rate or charge was derived. For example, is it a standard rate of the filing public utility; is it a special rate arrived at through negotiations and, if so, were unusual customer...
18 CFR 35.12 - Filing of initial rate schedules and tariffs.
Code of Federal Regulations, 2010 CFR
2010-04-01
... integration of hydroelectric generating resources whose output cannot be predicted quantitatively due to water... explanation of how the proposed rate or charge was derived. For example, is it a standard rate of the filing public utility; is it a special rate arrived at through negotiations and, if so, were unusual customer...
18 CFR 35.12 - Filing of initial rate schedules and tariffs.
Code of Federal Regulations, 2011 CFR
2011-04-01
... integration of hydroelectric generating resources whose output cannot be predicted quantitatively due to water... explanation of how the proposed rate or charge was derived. For example, is it a standard rate of the filing public utility; is it a special rate arrived at through negotiations and, if so, were unusual customer...
18 CFR 35.12 - Filing of initial rate schedules and tariffs.
Code of Federal Regulations, 2012 CFR
2012-04-01
... integration of hydroelectric generating resources whose output cannot be predicted quantitatively due to water... explanation of how the proposed rate or charge was derived. For example, is it a standard rate of the filing public utility; is it a special rate arrived at through negotiations and, if so, were unusual customer...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-01
... March 13, 2009 application, Pacific Gas and Electric Company (licensee) proposes to surrender the...) electric generators, turbines and other equipment would be removed; (5) both forebays would be graded and... coordinator, CarLisa Linton at (202) 502-8416 or [email protected] . Kimberly D. Bose, Secretary...
USDA-ARS?s Scientific Manuscript database
Degradation of agricultural watersheds often reduces their capacity to provide vital environmental services such as food production, clean potable water, water bodies for recreation and generation of hydro-electric power. Soil and water conservation practices on agricultural lands can enhance the ca...
Bureau of Reclamation Hydropower Lease of Power Privilege: Case Studies and Considerations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Curtis, Taylor L.; Levine, Aaron L.; McLaughlin, Kathleen
This report analyzes the U.S. Bureau of Reclamation's (Reclamation) lease of power privilege (LOPP) regulatory process for a nonfederal entity to use a Reclamation jurisdictional dam or conduit for power generation. Recent federal initiatives encouraging hydropower development at federally-owned facilities coupled with Reclamation's hydroelectric potential has led to an increased interest in powering Reclamation dams and conduits through the LOPP process. During the last five years, 23 of the 36 total LOPP projects (76 MW) have been initiated and are at some phase of the development process. Resource assessments analyzed in this report identify over 360 MW of hydroelectric potentialmore » at Reclamation-owned dams and conduits. This report provides considerations from Reclamation staff involved in the LOPP regulatory process and developers that have received an LOPP and are currently generating hydropower at a Reclamation dam or conduit. The authors also analyze LOPP regulatory processing timelines before and after the implementation of federal initiatives to streamline the LOPP process and provide case studies of hydropower projects that have obtained an LOPP.« less
NASA Astrophysics Data System (ADS)
Ando, T.; Kawasaki, A.; Koike, T.
2017-12-01
IPCC AR5 (2014) reported that rainfall in the middle latitudes of the Northern Hemisphere has been increasing since 1901, and it is claimed that warmer climate will increase the risk of floods. In contrast, world water demand is forecasted to exceed a sustainable supply by 40 percent by 2030. In order to avoid this expectable water shortage, securing new water resources has become an utmost challenge. However, flood risk prevention and the secure of water resources are contradictory. To solve this problem, we can use existing hydroelectric dams not only as energy resources but also for flood control. However, in case of Japan, hydroelectric dams take no responsibility for it, and benefits have not been discussed accrued by controlling flood by hydroelectric dams, namely by using preliminary water release from them. Therefore, our paper proposes methodology for assessing those benefits. This methodology has three stages as shown in Fig. 1. First, RRI model is used to model flood events, taking account of the probability of rainfall. Second, flood damage is calculated using assets in inundation areas multiplied by the inundation depths generated by that RRI model. Third, the losses stemming from preliminary water release are calculated, and adding them to flood damage, overall losses are calculated. We can evaluate the benefits by changing the volume of preliminary release. As a result, shown in Fig. 2, the use of hydroelectric dams to control flooding creates 20 billion Yen benefits, in the probability of three-day-ahead rainfall prediction of the assumed maximum rainfall in Oi River, in the Shizuoka Pref. of Japan. As the third priority in the Sendai Framework for Disaster Risk Reduction 2015-2030, `investing in disaster risk reduction for resilience - public and private investment in disaster risk prevention and reduction through structural and non-structural measures' was adopted. The accuracy of rainfall prediction is the key factor in maximizing the benefits. Therefore, if the accrued 20 billion Yen benefits by adopting this evaluation methodology are invested in improving rainfall prediction, the accuracy of the forecasts will increase and so will the benefits. This positive feedback loop will benefit society. The results of this study may stimulate further discussion on the role of hydroelectric dams in flood control.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bergey, M.
This paper presents an overview of the electric power system in Thailand. 99% of the country is electrified, but much of this is with diesel generators which leaves high costs but a high level of service. The paper discusses renewable energy projects which have been sited in the country, and examples of hybrid systems which have been retrofit into existing diesel generator systems. Photovoltaic and hydroelectric power projects are described. Dedicated systems have been installed for water pumping and battery charging applications.
CRANE WINCH MECHANISM, UPPER LEVEL OF HYDROELECTRIC POWER HOUSE ...
CRANE WINCH MECHANISM, UPPER LEVEL OF HYDROELECTRIC POWER HOUSE - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL
ELECTRICAL SWITCHBOARD IN UPPER LEVEL OF HYDROELECTRIC POWER HOUSE ...
ELECTRICAL SWITCHBOARD IN UPPER LEVEL OF HYDROELECTRIC POWER HOUSE - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL
Carbon Management in the Electric Power Industry
NASA Astrophysics Data System (ADS)
Stringer, John
2002-03-01
Approximately 53States in 2000 came from the combustion of coal in Rankine cycle plant; 16principally in Brayton cycle or combined cycle units. Electricity generation is responsible for 36amthropogenic CO2. This compares with 32transportation sector, but since the electric utility generators are large fixed sources it is likely that any legislation designed to reduce CO2 production will adress the utility generators first. Over the last 100 years there has been a continuous decrease in the carbon fraction of the fuels used for energy production world wide, and it is expected that this will continue, principally as a result of the increasing fraction of natural gas. It appears probable that the retirement of the existing nuclear fleet will be delayed by relicensing, and it seems more possible that new nuclear plant will be built than seemed likely even a couple of years ago. The impact of renewables should be increasing, but currently only about 2way currently, and without some considerable incentives, the rate of increase in this component over the next twenty years will probably be small. Currently, hydroelectric plants account for 7indication that this will increase appreciably. At the moment, a significant change would appear to require the capture of CO2 from the exhaust of the combustion plants, and particularly the large existing fleet of coal-fired Rankine units. Following the capture, the CO2 must then be sequestered in secure long-term locations. In addition, increases in the efficiency of power generation, and increases in the efficiency of end use leading to reductions in the energy intensity of the Gross Domestic Product, will be necessary. This paper will review the current state of art in these various approaches to the problem.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-06
.... e. Name of Project: Troy Hydroelectric Project. f. Location: On the Missisquoi River, in the Town of Troy, Orleans County, Vermont. The project would not occupy lands of the United States. g. Filed... application is not ready for environmental analysis at this time. n. The Troy Project would consist of: (1...
Uzbekistan Country Analysis Brief
2016-01-01
Total primary energy consumption in Uzbekistan was about 2.05 quadrillion British thermal units (Btu) in 2015, according to BP's 2016 Statistical Review. Natural gas accounted for the majority of consumption (88%), while consumption of petroleum products (5%), coal (2%), and hydroelectricity (5%) accounted for the remainder. Uzbekistan holds sizeable hydrocarbon reserves of natural gas, and its economy is highly dependent on the country’s energy resources.
Final Technical Report. Upgrades to Alabama Power Company Hydroelectric Developments
DOE Office of Scientific and Technical Information (OSTI.GOV)
Crew, James F.; Johnson, Herbie N.
2015-03-31
From 2010 to 2014, Alabama Power Company (“Alabama Power”) performed upgrades on four units at three of the hydropower developments it operates in east-central Alabama under licenses issued by the Federal Energy Regulatory Commission (“FERC”). These three hydropower developments are located on the Coosa River in Coosa, Chilton, and Elmore counties in east-central Alabama.
2015-01-01
Canada is a net exporter of most energy commodities and a significant producer of crude oil and other liquids from oil sands, natural gas, and hydroelectricity. Energy exports to the United States account for the vast majority of Canada's total energy exports. However, because of economic and other considerations, Canada is developing ways to diversify its trading partners, especially by expanding ties with emerging markets in Asia.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-17
...: August 17, 2012. d. Submitted By: Free Flow Power Corporation on behalf of its subsidiary limited... River in Beaver County, Pennsylvania. The project would occupy United States lands administered by the U..., Boston, MA 02114-2130; (978) 283-2822; or email at flow-power.com ">[email protected] flow-power.com . i...
VIEW OF SOUTHEAST SIDE OF HYDROELECTRIC POWER HOUSE, VIEW TOWARDS ...
VIEW OF SOUTHEAST SIDE OF HYDROELECTRIC POWER HOUSE, VIEW TOWARDS NORTHWEST - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL
PLANAR VIEW OF NORTHWEST SIDE OF HYDROELECTRIC POWER HOUSE, VIEW ...
PLANAR VIEW OF NORTHWEST SIDE OF HYDROELECTRIC POWER HOUSE, VIEW TOWARDS SOUTHEAST - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL
HANDMADE WOODEN RACK FOR TOOL STORE, LOWER LEVEL OF HYDROELECTRIC ...
HANDMADE WOODEN RACK FOR TOOL STORE, LOWER LEVEL OF HYDROELECTRIC POWER HOUSE - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL
HARNESS END OF ELECTRIC TURBINE IN LOWER LEVEL OF HYDROELECTRIC ...
HARNESS END OF ELECTRIC TURBINE IN LOWER LEVEL OF HYDROELECTRIC POWER HOUSE - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL
Study of hydraulic power recovery from New Mexico water distribution systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schoenmackers, R.
1984-02-01
The results of a survey of New Mexico water distribution systems suitable for hydroelectric power development are reported. The objectives of the survey were to determine the potential for hydraulic power recovery from existing and planned water systems, to identify potential sites, and to study and recommend promising sites for further development. The survey found eleven sites in New Mexico water distribution systems with a total hydroelectric power potential of 736 kilowatts. Seven of these sites, or 439 kilowatts, could be developed immediately, having everything necessary in place but the turbine generator. These sites are located in the Bonito pipelinemore » near Carrizozo (2 sites), Raton, Ruidoso, Santa Fe, Sugarite, and Taos. If all seven sites were developed, the annual energy production could reach 3,800,000 kilowatt hours.« less
5. Station Unwatering Pumps and Sump Pump for Units 1 ...
5. Station Unwatering Pumps and Sump Pump for Units 1 and 2, view to the west. The unwatering pumps are the two larger items toward the right side of the photograph (one in foreground and one in background. The smaller item toward the left of the photograph is the sump pump. These pumps are used for draining water from the draft chest for maintenance. - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID
Estimated use of water in the United States in 1995
Solley, Wayne B.; Pierce, Robert R.; Perlman, Howard A.
1998-01-01
The purpose of this report is to present consistent and current water-use estimates by state and water-resources region for the United States, Puerto Rico, the U.S. Virgin Islands, and the District of Columbia. Estimates of water withdrawn from surface- and ground-water sources, estimates of consumptive use, and estimates of instream use and wastewater releases during 1995 are presented in this report. This report discusses eight categories of offstream water use--public supply, domestic, commercial, irrigation, livestock, industrial, mining, and thermoelectric power--and one category of instream use: hydroelectric power.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-29
... Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for a Programmatic... Hydroelectric Project No. 2203. The programmatic agreement, when executed by the Commission, the Alabama SHPO...
OBLIQUE VIEW OF NORTHEAST AND SOUTHEAST SIDES OF HYDROELECTRIC POWER ...
OBLIQUE VIEW OF NORTHEAST AND SOUTHEAST SIDES OF HYDROELECTRIC POWER HOUSE, VIEW TOWARDS WEST - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL
Influence of El Niño Southern Oscillation on global hydropower production
NASA Astrophysics Data System (ADS)
Ng, Jia Yi; Turner, Sean W. D.; Galelli, Stefano
2017-03-01
El Niño Southern Oscillation (ENSO) strongly influences the global climate system, affecting hydrology in many of the world’s river basins. This raises the prospect of ENSO-driven variability in global and regional hydroelectric power generation. Here we study these effects by generating time series of power production for 1593 hydropower dams, which collectively represent more than half of the world’s existing installed hydropower capacity. The time series are generated by forcing a detailed dam model with monthly-resolution, 20th century inflows—the model includes plant specifications, storage dynamics and realistic operating schemes, and runs irrespectively of the dam construction year. More than one third of simulated dams exhibit statistically significant annual energy production anomalies in at least one of the two ENSO phases of El Niño and La Niña. For most dams, the variability of relative anomalies in power production tends to be less than that of the forcing inflows—a consequence of dam design specifications, namely maximum turbine release rate and reservoir storage, which allows inflows to accumulate for power generation in subsequent dry years. Production is affected most prominently in Northwest United States, South America, Central America, the Iberian Peninsula, Southeast Asia and Southeast Australia. When aggregated globally, positive and negative energy production anomalies effectively cancel each other out, resulting in a weak and statistically insignificant net global anomaly for both ENSO phases.
Potential for travertine formation: Fossil Creek, Arizona
John Malusa; Steven T. Overby; Roderic A. Parnell
2003-01-01
Chemical analyses of water emanating from Fossil Springs in Central Arizona were conducted to predict changes in travertine deposition related to changes in stream discharge caused by diversion for hydroelectric power generation. During spring of 1996, water was sampled at 15 locations during normal seepage flow in a 6.7 km reach below Fossil Springs and at full...
77 FR 51993 - Western Technical College; Notice of Availability of Environmental Assessment
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-28
... hydroelectric generation at the dam. The dam is operated manually in a run-of-river mode (i.e., an operating...) distribution line; and (5) appurtenant facilities. The project would be operated in a run-of-river mode using... could otherwise enter project waters or adjacent non-project lands; Operating the project in a run-of...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-08
... generator; (3) a concrete tailrace releasing water into the river downstream of the dam; (4) a switchyard... study the feasibility of the Peoria Dam, Illinois--Hydroelectric Water Power Project (Peoria Dam Project...-long, 50-foot-wide, 55-foot-high powerhouse containing two horizontal Kaplan pit turbines each with a...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-20
... (Western) would have the first opportunity to purchase and/or market the power that would be generated by... purchasing and/or marketing considerations. Interested entities are invited to submit a proposal on this.... Information related to Western's purchasing and/or marketing the power may be obtained at Western Area Power...
Water use on the Snake River plain, Idaho and eastern Oregon
Goodell, S.A.
1988-01-01
Industries, including aquaculture, withdrew an estimated 1.97 million acre-feet of water. Withdrawals for other offstream uses, including public and rural supplies, totaled 132,000 acre-feet. Hydroelectric power generation is an economically important instream use of water. In 1980, about 52 million acre-feet of surface water was used to generate 2.6 million megawatt-hours of electricity. Native vegetation evapo- transpired an estimated 3.7 million acre-feet, and 900,000 acre-feet evaporated from bare ground and open water.
OBLIQUE VIEW OF NORTHWEST AND NORTHEAST SIDES OF HYDROELECTRIC POWER ...
OBLIQUE VIEW OF NORTHWEST AND NORTHEAST SIDES OF HYDROELECTRIC POWER HOUSE, OLD BYPASS IN BACKGROUND, VIEW TOWARDS SOUTH - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL
31. Photocopy of microfiched construction drawing by Pelton Water Wheel ...
31. Photocopy of microfiched construction drawing by Pelton Water Wheel Company, San Francisco, California, originally dated 5-2-47 with alterations dated 6-7-54 and 11-9-54. (Microfiched drawing located at the Denver Service Center, #104/60151 - 5 of 18) LONGITUDINAL SECTION OF RECONSTRUCTED TURBINE - UNIT NO. 2. - Yosemite Hydroelectric Power Plant, Highways 120 & 140, Yosemite Village, Mariposa County, CA
2015-01-01
In 2014, Brazil was the eighth-largest energy consumer in the world and the third-largest in the Americas, behind the United States and Canada, according to BP statistics. Total primary energy consumption in Brazil has nearly doubled in the past decade1 because of sustained economic growth. The largest share of Brazil's total energy consumption is oil and other liquid fuels, followed by hydroelectricity and natural gas
Big Creek Hydroelectric System, East & West Transmission Line, 241mile ...
Big Creek Hydroelectric System, East & West Transmission Line, 241-mile transmission corridor extending between the Big Creek Hydroelectric System in the Sierra National Forest in Fresno County and the Eagle Rock Substation in Los Angeles, California, Visalia, Tulare County, CA
Iakimova, L D
1997-01-01
The article touches upon hygienic problems associated with mechanization and automation of major hydroelectric power stations. The authors present criteria to evaluate work conditions of the main occupations participating in the technologic process of hydroelectric power stations.
Hydroelectric voltage generation based on water-filled single-walled carbon nanotubes.
Yuan, Quanzi; Zhao, Ya-Pu
2009-05-13
A DFT/MD mutual iterative method was employed to give insights into the mechanism of voltage generation based on water-filled single-walled carbon nanotubes (SWCNTs). Our calculations showed that a constant voltage difference of several mV would generate between the two ends of a carbon nanotube, due to interactions between the water dipole chains and charge carriers in the tube. Our work validates this structure of a water-filled SWCNT as a promising candidate for a synthetic nanoscale power cell, as well as a practical nanopower harvesting device at the atomic level.
OBLIQUE VIEW OF NORTHWEST SIDE OF HYDROELECTRIC POWER HOUSE AND ...
OBLIQUE VIEW OF NORTHWEST SIDE OF HYDROELECTRIC POWER HOUSE AND INTERIOR OF SOUTHWEST CORNER OF OLD BYPASS IN FOREGROUND, VIEW TOWARDS SOUTHWEST - St. Lucie Canal, Lock No. 1, Hydroelectric Power House, St. Lucie, Cross State Canal, Okeechobee Intracoastal Waterway, Stuart, Martin County, FL
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-31
... Hydroelectric LLC, Lock Hydro Friends Fund XLV, FFP Project 2 LLC; Notice of Competing Preliminary Permit... (Riverbank) and Solia 3 Hydroelectric LLC (Solia) and on May 3, 2011, Lock Hydro Friends Fund XLV (Lock Hydro...
Estimated use of water in South Dakota, 2000
Amundson, Franklin D.
2002-01-01
During 2000, the total amount of water withdrawn from ground- and surface-water sources in South Dakota was about 528 Mgal/d (million gallons per day). Of this amount, about 222 Mgal/d, or 42 percent of the total, was from ground water. Surface-water withdrawals were about 306 Mgal/d, or 58 percent of the total. Total withdrawals for six categories of offstream use in South Dakota during 2000 were compiled. The withdrawals include: 93.3 Mgal/d for public supply, 9.53 Mgal/d for self-supplied domestic, 5.12 Mgal/d for industrial, 372.7 Mgal/d for irrigation, 5.24 Mgal/d for thermoelectric power, and 42.0 Mgal/d for livestock. Water use for hydroelectric power was the only instream use compiled in this report. About 57,794 Mgal/d was used by the hydroelectric powerplants to generate about 6,151 gigawatt-hours of electricity during 2000.
1. CONTEXTUAL VIEW OF THE NINE MILE HYDROELECTRIC DEVELOPMENT (HED), ...
1. CONTEXTUAL VIEW OF THE NINE MILE HYDROELECTRIC DEVELOPMENT (HED), SHOWING DAM AND POWERHOUSE IN FOREGROUND, VILLAGE COMPLEX IN RIGHT BACKGROUND, LOOKING WEST FROM ABOVE STATE HIGHWAY 291 - Nine Mile Hydroelectric Development, State Highway 291 along Spokane River, Nine Mile Falls, Spokane County, WA
Aspects of Mathematical Modelling of Pressure Retarded Osmosis
Anissimov, Yuri G.
2016-01-01
In power generating terms, a pressure retarded osmosis (PRO) energy generating plant, on a river entering a sea or ocean, is equivalent to a hydroelectric dam with a height of about 60 meters. Therefore, PRO can add significantly to existing renewable power generation capacity if economical constrains of the method are resolved. PRO energy generation relies on a semipermeable membrane that is permeable to water and impermeable to salt. Mathematical modelling plays an important part in understanding flows of water and salt near and across semipermeable membranes and helps to optimize PRO energy generation. Therefore, the modelling can help realizing PRO energy generation potential. In this work, a few aspects of mathematical modelling of the PRO process are reviewed and discussed. PMID:26848696
78 FR 68834 - Exelon Generation Company, LLC; Notice of Staff Attendance at Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-15
... attend the Maryland Department of Natural Resources (Maryland DNR) Open House on the Conowingo Dam Relicensing Process. The purpose of the Open House is for Maryland DNR to provide local citizens and... Hydroelectric Project No. 405. The Open House will be held from 7:00 p.m. to 9:30 p.m. at the Harford Community...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-13
... fishway (inactive); and (e) a 734-foot earth dike with a concrete core wall; (2) a 9,700-acre reservoir... downstream demands for hydroelectric generation in the Kennebec River and for flood control. Reservoir fluctuations follow an annual cycle under which reservoir levels are reduced during the fall and winter to...
146. View of oil filter room in basement (Room B1) ...
146. View of oil filter room in basement (Room B-1) where oil used in lubrication in generator room is cleaned and recycled. The two tanks in the foreground each have capacities of 2,100 gallons. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA
Dams in the Amazon: Belo Monte and Brazil's hydroelectric development of the Xingu River Basin.
Fearnside, Phillip M
2006-07-01
Hydroelectric dams represent major investments and major sources of environmental and social impacts. Powerful forces surround the decision-making process on public investments in the various options for the generation and conservation of electricity. Brazil's proposed Belo Monte Dam (formerly Kararaô) and its upstream counterpart, the Altamira Dam (better known by its former name of Babaquara) are at the center of controversies on the decision-making process for major infrastructure projects in Amazonia. The Belo Monte Dam by itself would have a small reservoir area (440 km2) and large installed capacity (11, 181.3 MW), but the Altamira/Babaquara Dam that would regulate the flow of the Xingu River (thereby increasing power generation at Belo Monte) would flood a vast area (6140 km2). The great impact of dams provides a powerful reason for Brazil to reassess its current policies that allocate large amounts of energy in the country's national grid to subsidized aluminum smelting for export. The case of Belo Monte and the five additional dams planned upstream (including the Altamira/Babaquara Dam) indicate the need for Brazil to reform its environmental assessment and licensing system to include the impacts of multiple interdependent projects.
González-Piana, Mauricio; Fabián, Daniel; Piccardo, Andrea; Chalar, Guillermo
2017-10-01
This study analyzed the temporal dynamics of total microcystin LR concentrations between the years of 2012 and 2015 in the Bonete, Baygorria and Palmar hydroelectric generation reservoirs in the central region of the Negro River, Uruguay. The three reservoirs showed differents total microcystin LR concentration, with no significant differences among them. Over 20 sampling dates, the three reservoirs exhibited total microcystin LR concentrations on eight occasions that corresponded to a slight to moderate human health risk according to WHO guideline values for recreational waters. By determining the concentration of microcystin LR in cyanobacterial biomass, we identified cyanobacterial populations that occurred over time with varying degrees of toxin production (maximal 85.4 µg/mm 3 ). The microcystin LR concentration in Bonete was positively correlated with temperature (r = 0.587) and cyanobacterial biomass (r = 0.736), in Baygorria with cyanobacterial biomass (r = 0.521), and in Palmar with temperature (r = 0.500) and negatively correlated with ammonia (r = -0.492). Action is needed to reduce the presence of toxic cyanobacteria in these systems. A decrease in the use of agrochemicals and management changes in the reservoir basins could be successful long-term measures.
River flow maintenance turbine for Milner Hydroelectric Development
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carson, J.L.; Holveck, W.H.; Gokhman, A.
1995-12-31
The Milner Hydroelectric Project on the Snake River in Idaho was commissioned in 1992. The project included renovation of an existing dam, which was built to supply irrigation water to a canal system, construction of a new spillway, and the addition of a new powerhouse. The forebay of the main powerhouse is located on a combination power and irrigation canal, approximately 3500 feet (1070 m) from the dam, with a short tailrace returning the water to the river. There are two Kaplan turbines installed in the main powerhouse, rated at 1000 cfs and 4000 cfs respectively at a net headmore » of 150 feet. The FERC license required that a target flow of 200 cfs be released from the dam to maintain a stream flow between the dam and the powerhouse. In order to utilize this flow, a small powerhouse was constructed at the toe of the dam. The site conditions favored a vertical axial flow turbine, with a net head of 56 feet. As the flow is constant and the head is fairly constant, a fixed geometry turbine was selected, to be controlled solely by the intake gate. Due to the higher head, the main powerhouse can generate more power per unit of flow than can the bypass turbine. Therefore, it is undesirable for the discharge of the bypass turbine to be any greater than required by the license. Also, the release flow is determined by a river gauge, the accuracy of which is unknown, but assumed to be within five percent. In order to meet these two requirements, the turbine was specified to have manually adjustable runner blades to obtain the required release flow of 200 cfs at any head between 55 and 58 feet.« less
18 CFR 420.51 - Hydroelectric power plant water use charges.
Code of Federal Regulations, 2013 CFR
2013-04-01
... increased hydraulic head available to the hydroelectric project as a result of investments by the Commission shall be charged one mill per kilowatt-hour of energy produced. (2) Owners of hydroelectric power plants... kilowatt-hour of energy produced. No charges for increased flows will be required when charges for...
18 CFR 420.51 - Hydroelectric power plant water use charges.
Code of Federal Regulations, 2011 CFR
2011-04-01
... increased hydraulic head available to the hydroelectric project as a result of investments by the Commission shall be charged one mill per kilowatt-hour of energy produced. (2) Owners of hydroelectric power plants... kilowatt-hour of energy produced. No charges for increased flows will be required when charges for...
18 CFR 420.51 - Hydroelectric power plant water use charges.
Code of Federal Regulations, 2012 CFR
2012-04-01
... increased hydraulic head available to the hydroelectric project as a result of investments by the Commission shall be charged one mill per kilowatt-hour of energy produced. (2) Owners of hydroelectric power plants... kilowatt-hour of energy produced. No charges for increased flows will be required when charges for...
18 CFR 420.51 - Hydroelectric power plant water use charges.
Code of Federal Regulations, 2014 CFR
2014-04-01
... increased hydraulic head available to the hydroelectric project as a result of investments by the Commission shall be charged one mill per kilowatt-hour of energy produced. (2) Owners of hydroelectric power plants... kilowatt-hour of energy produced. No charges for increased flows will be required when charges for...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-09
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting Postponement On July 17, 2012, the...), on the Eagle Mountain Pumped Storage Hydroelectric Project. However, the meeting has been postponed...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-21
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Cancellation of Teleconference On March 15... Mountain Pumped Storage Hydroelectric Project. This meeting has been cancelled. We will reschedule this...
18 CFR 292.203 - General requirements for qualification.
Code of Federal Regulations, 2010 CFR
2010-04-01
... certification, pursuant to § 292.207(b)(1), that has been granted. (c) Hydroelectric small power production facilities located at a new dam or diversion. (1) A hydroelectric small power production facility that..., pursuant to § 292.207(b)(1), that has been granted. (c) Hydroelectric small power production facilities...
18 CFR 420.51 - Hydroelectric power plant water use charges.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Hydroelectric power plant water use charges. 420.51 Section 420.51 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL BASIN REGULATIONS-WATER SUPPLY CHARGES Hydroelectric Power Water...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-17
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Uniontown Hydro, LLC, Project No. 12958-001-Kentucky and Indiana, Uniontown Hydroelectric Project; Newburgh Hydro, LLC, Project No. 12962-001-Kentucky and Indiana, Newburgh Hydroelectric Project; Notice of Revised Restricted Service List for a...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-13
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 349-173] Martin Dam Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement for the Martin Dam... the Martin Dam Hydroelectric Project (FERC No. 349), located on the Tallapoosa River in Tallapoosa...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-31
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2149-152] Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement for the Wells... application for license for the Wells Hydroelectric Project (FERC No. 2149), located on the Columbia River in...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-13
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2149-152] Wells Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement for the Wells... of Energy Projects has reviewed the application for license for the Wells Hydroelectric Project (FERC...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-13
...) to provide the Commission with the responsibility of issuing licenses for non-federal hydroelectric... States public. Types of Respondents: Non-federal hydroelectric plants greater than 5 megawatt capacity (FERC-500); non-federal hydroelectric plants less than 5 megawatts capacity (FERC-505). Estimate of...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-29
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 199-205] South Carolina Public Service Authority; Notice of Workshop for Santee Cooper Hydroelectric Project On May 26 and...) and the South Carolina Public Service Authority (SCPSA), licensee for the Santee-Cooper Hydroelectric...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-04
...-063--Georgia and Alabama, Bartletts Ferry Hydroelectric Project; Notice of Proposed Restricted Service... Ferry Hydroelectric Project. The Programmatic Agreement, when executed by the Commission, the Georgia...., Bin 10221, Atlanta, GA 30308. Elizabeth Ann Brown, Deputy SHPO, Joey Charles, Georgia Power Alabama...
Flow management for hydropower extirpates aquatic insects, undermining river food webs
Kennedy, Theodore A.; Muehlbauer, Jeffrey D.; Yackulic, Charles B.; Lytle, D.A.; Miller, S.A.; Dibble, Kimberly L.; Kortenhoeven, Eric W.; Metcalfe, Anya; Baxter, Colden V.
2016-01-01
Dams impound the majority of rivers and provide important societal benefits, especially daily water releases that enable on-peak hydroelectricity generation. Such “hydropeaking” is common worldwide, but its downstream impacts remain unclear. We evaluated the response of aquatic insects, a cornerstone of river food webs, to hydropeaking using a life history–hydrodynamic model. Our model predicts that aquatic-insect abundance will depend on a basic life-history trait—adult egg-laying behavior—such that open-water layers will be unaffected by hydropeaking, whereas ecologically important and widespread river-edge layers, such as mayflies, will be extirpated. These predictions are supported by a more-than-2500-sample, citizen-science data set of aquatic insects from the Colorado River in the Grand Canyon and by a survey of insect diversity and hydropeaking intensity across dammed rivers of the Western United States. Our study reveals a hydropeaking-related life history bottleneck that precludes viable populations of many aquatic insects from inhabiting regulated rivers.
Tillman, Fred D.
2015-01-01
The Colorado River and its tributaries supply water to more than 35 million people in the United States and 3 million people in Mexico, irrigating more than 4.5 million acres of farmland, and generating about 12 billion kilowatt hours of hydroelectric power annually. The Upper Colorado River Basin, encompassing more than 110,000 square miles (mi2), contains the headwaters of the Colorado River (also known as the River) and is an important source of snowmelt runoff to the River. Groundwater discharge also is an important source of water in the River and its tributaries, with estimates ranging from 21 to 58 percent of streamflow in the upper basin. Planning for the sustainable management of the Colorado River in future climates requires an understanding of the Upper Colorado River Basin groundwater system. This report documents input datasets for a Soil-Water Balance groundwater recharge model that was developed for the Upper Colorado River Basin.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Witt, Adam M; Smith, Brennan T
Small hydropower plants supply reliable renewable energy to the grid, though few new plants have been developed in the Unites States over the past few decades due to complex environmental challenges and poor project economics. This paper describes the current landscape of small hydropower development, and introduces a new approach to facility design that co-optimizes the extraction of hydroelectric power from a stream with other important environmental functions such as fish, sediment, and recreational passage. The approach considers hydropower facilities as an integrated system of standardized interlocking modules, designed to sustain stream functions, generate power, and interface with the streambed.more » It is hypothesized that this modular eco-design approach, when guided by input from the broader small hydropower stakeholder community, can lead to cost savings across the facility, reduced licensing and approval timelines, and ultimately, to enhanced resiliency through improved environmental performance over the lifetime of the project.« less
NASA Astrophysics Data System (ADS)
Sant, T.; Buhagiar, D.; Farrugia, R. N.
2014-06-01
A new concept utilising floating wind turbines to exploit the low temperatures of deep sea water for space cooling in buildings is presented. The approach is based on offshore hydraulic wind turbines pumping pressurised deep sea water to a centralised plant consisting of a hydro-electric power system coupled to a large-scale sea water-cooled air conditioning (AC) unit of an urban district cooling network. In order to investigate the potential advantages of this new concept over conventional technologies, a simplified model for performance simulation of a vapour compression AC unit was applied independently to three different systems, with the AC unit operating with (1) a constant flow of sea surface water, (2) a constant flow of sea water consisting of a mixture of surface sea water and deep sea water delivered by a single offshore hydraulic wind turbine and (3) an intermittent flow of deep sea water pumped by a single offshore hydraulic wind turbine. The analysis was based on one year of wind and ambient temperature data for the Central Mediterranean that is known for its deep waters, warm climate and relatively low wind speeds. The study confirmed that while the present concept is less efficient than conventional turbines utilising grid-connected electrical generators, a significant portion of the losses associated with the hydraulic transmission through the pipeline are offset by the extraction of cool deep sea water which reduces the electricity consumption of urban air-conditioning units.
20. Station Unwatering Pumps and Sump Pump, view to the ...
20. Station Unwatering Pumps and Sump Pump, view to the north. The station unwatering pumps are the two large units in the center and right foreground of photograph and are marked with the numbers 1 and 2. The sump pump is the smaller unit in left foreground of photograph. These pumps are used for unwatering the draft chests for maintenance. Note the draft tube unwatering valve visible in background between the two unwatering pumps. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT
DOE Office of Scientific and Technical Information (OSTI.GOV)
Confederated Tribes of the Umatilla Indian Reservation Wildlife Program
The Confederated Tribes of the Umatilla Indian Reservation (CTUIR) propose to continue to protect, enhance, and mitigate wildlife and wildlife habitat at the Wanaket Wildlife Area. The Wanaket Wildlife Area was approved as a Columbia River Basin Wildlife Mitigation Project by the Bonneville Power Administration (BPA) and Northwest Power Planning Council (NWPPC) in 1993. This management plan will provide an update of the original management plan approved by BPA in 1995. Wanaket will contribute towards meeting BPA's obligation to compensate for wildlife habitat losses resulting from the construction of the McNary Hydroelectric facility on the Columbia River. By funding themore » enhancement and operation and maintenance of the Wanaket Wildlife Area, BPA will receive credit towards their mitigation debt. The purpose of the Wanaket Wildlife Area management plan update is to provide programmatic and site-specific standards and guidelines on how the Wanaket Wildlife Area will be managed over the next five years. This plan provides overall guidance on both short and long term activities that will move the area towards the goals, objectives, and desired future conditions for the planning area. The plan will incorporate managed and protected wildlife and wildlife habitat, including operations and maintenance, enhancements, and access and travel management. Specific project objectives are related to protection and enhancement of wildlife habitats and are expressed in terms of habitat units (HU's). Habitat units were developed by the US Fish and Wildlife Service's Habitat Evaluation Procedures (HEP), and are designed to track habitat gains and/or losses associated with mitigation and/or development projects. Habitat Units for a given species are a product of habitat quantity (expressed in acres) and habitat quality estimates. Habitat quality estimates are developed using Habitat Suitability Indices (HSI). These indices are based on quantifiable habitat features such as vegetation height, shrub cover, or other parameters, which are known to provide life history requisites for mitigation species. Habitat Suitability Indices range from 0 to 1, with an HSI of 1 providing optimum habitat conditions for the selected species. One acre of optimum habitat provides one Habitat Unit. The objective of continued management of the Wanaket Wildlife Mitigation Area, including protection and enhancement of upland and wetland/wetland associated cover types, is to provide and maintain 2,334 HU's of protection credit and generate 2,495 HU's of enhancement credit by the year 2004.« less
Estimated use of water in the New England States, 1990
Korzendorfer, B.A.; Horn, M.A.
1995-01-01
Data on freshwater withdrawals in 1990 were compiled for the New England States. An estimated 4,160 Mgal/d (million gallons per day) of freshwater was withdrawn in 1990 in the six States. Of this total, 1,430 Mgal/d was withdrawn by public suppliers and delivered to users, and 2,720 Mgal/d was withdrawn by domestic, commercial, industrial, agricultural, mining, and thermoelectric power-generation users. More than 83 percent of the freshwater was from surface-water sources. Massachusetts, with the largest population, had the largest withdrawals of water. Data on saline water withdraw, and instream flow at hydroelectric plants were also compiled. An estimated 9, 170 Mgal/d of saline water was used for thermoelectric-power generation and industrial use in Connecticut, Maine, Massachusetts, New Hampshire, and Rhode Island. Return flow fro public wastewater-treatment plants totaled 1,750 Mgal/d; more than half (55 percent) of this return flow was in Massachusetts. In addition, about 178,000 Mgal/d was used for instream hydroelectric power generation; the largest users were Maine (about 83,000 Mgal/d) and New Hampshire (46,000 Mgal/d). These data, some of which were based on site-specific water-use information and some based on estimation techniques, were compiled through joint efforts by the U.S. Geological Survey and State cooperators for the 1990 national water-use compilation.
75 FR 66748 - City of Kaukauna, WI; Notice of Authorization for Continued Project Operation
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-29
... City of Kaukauna, Wisconsin, licensee for the Badger-Rapide Croche Hydroelectric Project, filed an... thereunder. The Badger-Rapide Croche Hydroelectric Project is on the Fox River in Outagamie County, near the... operation of the Badger-Rapide Croche Hydroelectric Project, until such time as the Commission acts on its...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-22
... Hydroelectric LLC; Western Minnesota Municipal Power Agency; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On October 14, 2011, CRD Hydroelectric LLC (transferor) and Western Minnesota Municipal Power Agency (transferee) filed an application for transfer of license for the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-09
... Hydroelectric, Inc., New Hampshire Hydro Associates; Notice of Transfer of Exemption August 5, 2013. 1. By letter filed July 19, 2013, Rivermill Hydroelectric, Inc. and New Hampshire Hydro Associates informed the... issued September 21, 1988,\\2\\ has been transferred to New Hampshire Hydro Associates. The project is...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-28
... Hydroelectric Dam, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On October 19, 2012, Ceresco Hydroelectric Dam, LLC... feet National Geodetic Vertical Datum; (2) a dam comprised of (a) a 126- foot-wide, 13-foot-high...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-02
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12478-003] Gibson Dam... of Application: Major Project--Existing Dam. b. Project No.: P-12478-003. c. Date filed: August 28, 2009. d. Applicant: Gibson Dam Hydroelectric Company, LLC. e. Name of Project: Gibson Dam Hydroelectric...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-09
... Dam Hydroelectric Company, LLC; Notice of Availability of Draft Environmental Assessment In accordance... reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S. Department of the Interior, Bureau of Reclamation's, Gibson dam on the Sun River in Lewis and Clark and Teton...
Rivers of Energy: The Hydropower Potential. Worldwatch Paper No. 44.
ERIC Educational Resources Information Center
Deudney, Daniel
Described are the history, current status and future potential of hydroelectric power in the world. Issues discussed include the environmental and social impacts of dam construction, and the use of small-scale hydroelectric installations in developing nations. Also considered are hydroelectric development of the world's remote regions, the need to…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-29
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14261-000; 14268-000; 14277-000; 14281-000] Lock Hydro Friends Fund XVIII; Upper Hydroelectric LLC; FFP Project 95 LLC... Friends Fund XVIII (Lock Hydro), Upper Hydroelectric LLC (Upper Hydro), Riverbank Hydro No. 25 LLC...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-19
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2790-055] Boott Hydropower... Hydropower, Inc. and Eldred L Field Hydroelectric Facility Trust. e. Name of Project: Lowell Hydroelectric... Affairs Coordinator, Boott Hydropower, Inc., One Tech Drive, Suite 220, Andover, MA 01810. Tel: (978) 681...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-09
... Hydroelectric Company, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On March 1, 2013, Sutton Hydroelectric Company, LLC filed an application for a successive preliminary permit, pursuant to section 4(f) of the Federal Power Act...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-28
... Operations of PacifiCorp's Klamath Hydroelectric Project on the Klamath River, Klamath County, OR, and... Environmental Policy Act (NEPA) for the interim operations of the Klamath Hydroelectric Project in [[Page 5831... habitats upon which they depend, resulting from the interim operations of the Klamath Hydroelectric Project...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-22
... Amendment of License. b. Project No.: 11313-019. c. Date Filed: March 31, 2010. d. Applicant: White Mountain Hydroelectric Corp. e. Name of Project: Apthorp Hydroelectric Project. f. Location: The project is located on... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 11313-019] White Mountain...
Impacts of hydroelectric dams on alluvial riparian plant communities in Eastern Brazilian Amazonian.
Ferreira, Leandro Valle; Cunha, Denise A; Chaves, Priscilla P; Matos, Darley C L; Parolin, Pia
2013-09-01
The major rivers of the Amazon River basin and their biota are threatened by the planned construction of large hydroelectric dams that are expected to have strong impacts on floodplain plant communities. The present study presents forest inventories from three floodplain sites colonized by alluvial riparian vegetation in the Tapajós, Xingu and Tocantins River basins in eastern Amazonian. Results indicate that tree species of the highly specialized alluvial riparian vegetation are clearly distinct among the three river basins, although they are not very distinct from each other and environmental constraints are very similar. With only 6 of 74 species occurring in all three inventories, most tree and shrub species are restricted to only one of the rivers, indicating a high degree of local distribution. Different species occupy similar environmental niches, making these fragile riparian formations highly valuable. Conservation plans must consider species complementarily when decisions are made on where to place floodplain forest conservation units to avoid the irreversible loss of unique alluvial riparian vegetation biodiversity.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Turbak, S. C.; Reichle, D. R.; Shriner, C. R.
1981-01-01
This document presents a state-of-the-art review of literature concerning turbine-related fish mortality. The review discusses conventional and, to a lesser degree, pumped-storage (reversible) hydroelectric facilities. Much of the research on conventional facilities discussed in this report deals with studies performed in the Pacific Northwest and covers both prototype and model studies. Research conducted on Kaplan and Francis turbines during the 1950s and 1960s has been extensively reviewed and is discussed. Very little work on turbine-related fish mortality has been undertaken with newer turbine designs developed for more modern small-scale hydropower facilities; however, one study on a bulb unit (Kaplan runner)more » has recently been released. In discussing turbine-related fish mortality at pumped-storage facilities, much of the literature relates to the Ludington Pumped Storage Power Plant. As such, it is used as the principal facility in discussing research concerning pumped storage.« less
Snow mapping from space platforms
NASA Technical Reports Server (NTRS)
Itten, K. I.
1980-01-01
The paper considers problems of optimum resolution, periodicity, and wavelength bands used for snow mapping. Analog and digital methods were used for application of satellite data; techniques were developed for producing steamflow forecasts, hydroelectric power generation regulation data, irrigation potentials, and information on the availability of drinking water supplies. Future systems will utilize improved spectral band selection, new spectral regions, higher repetition rates, and more rapid access to satellite data.
Water Footprint of Hydroelectricity: A Case Study of Two Large Canadian Boreal Watersheds
NASA Astrophysics Data System (ADS)
Irambona, C.; Music, B.; Nadeau, D.; Mahdi, T. F.; Strachan, I. B.
2015-12-01
20% of Canada's total freshwater is located in the province of Quebec, where 30% of the country's energy is produced from hydropower. Hydroelectric generation uses a considerable amount of water through evaporation from the reservoirs. The blue water footprint is an indicator of the annual freshwater consumption related to hydropower production. Although environmental effects of reservoir impounding have been previously investigated, their impacts on local and regional evapotranspiration are still not well understood due to the lack of long-term observation data. This study aims to assess the blue water footprint of two large hydroelectric systems located in the Canadian boreal forest. To do so, we use hydro-meteorological data from two specially designed climate simulations (a 'no-reservoir' and a 'post-impoundment' simulation) performed by the fifth generation of the Canadian Regional Climate Model (CRCM5) driven by the ERA-Interim reanalysis. Land-surface processes in the CRCM5 are parameterized by the Canadian Land Surface Scheme (CLASS V3.6), while surface fluxes over the water bodies are simulated by the 1-D lake model (Flake). A 'no-reservoir' and a 'post-impoundment' simulation are carried by adjusting the water fraction on the reservoir grids. Both simulations cover a 42 years period (1970-2012) at 0.11° horizontal resolution, consisting of 300 x 300 grid points centered on the province of Quebec. The two watersheds under study (200 000 km² total) are located in Northern Quebec (49-54°N), Canada, where more than 42% of the province power generation capacity is installed with eight reservoirs covering a total area of 10 000 km². A first validation of the 'post-impoundment' simulation is performed using micrometeorological ground observations, complemented with available hydro-meteorological data from Environment Canada weather stations. Then, each reservoir water footprint is calculated using the 'post-impoundment' simulation. Finally, the net evapotranspiration and the pre and post impoundment water budgets are assessed on the watershed scale. Results from this study are expected to be useful for water resources management in Quebec and other similar boreal environments.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-20
... Jayne Chase Troy Mills Hydroelectric Inc.; Notice of Transfer of Exemption 1. By letter filed October 15, 2013, Jonathan Chase informed the Commission that the exemption from licensing for the Troy Hydroelectric Project, FERC No. 13381, originally issued December 2, 2011,\\1\\ has been transferred to Troy Mills...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-06
... Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a... of the Meeting: Commission staff will meet with the staff of the Bureau of Land Management to improve... Policy and Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage Hydroelectric...
7. SHOSHONE HYDROELECTRIC PLANT, WEST ELEVATION OF MAIN BUILDING TO ...
7. SHOSHONE HYDROELECTRIC PLANT, WEST ELEVATION OF MAIN BUILDING TO THE LEFT, NORTH ELEVATION OF OFFICE BUILDING TO THE RIGHT, VIEW TO THE EAST. CONCRETE 'PATH' IN FOREGROUND IS THE CONDUIT THROUGH WHICH POWER CABLES RUN FROM THE TRANSFORMERS TO THE 115 KV SUBSTATION. - Shoshone Hydroelectric Plant Complex, 60111 U.S. Highway 6, Garfield County, CO
Code of Federal Regulations, 2010 CFR
2010-07-01
... Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF... hydropower projects under the Federal Power Act (ER 1140-2-4). Pt. 221, List List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects The following FPC standard articles Forms...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF... hydropower projects under the Federal Power Act (ER 1140-2-4). Pt. 221, List List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects The following FPC standard articles Forms...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-24
... Supply Creek Hydroelectric Project. f. Location: The proposed Water Supply Creek Hydroelectric Project will be located on Water Supply Creek, near the town of Hoonah on Chichagof Island, Alaska, affecting T... proposed run-of-river Water Supply Creek Hydroelectric Project will consist of: (1) A proposed 8-foot- high...
Enhancing fire safety at Hydro plants with dry transformers
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clemen, D.M.
Hydroelectric plant owners and engineers can use dry-type transformers to reduce fire hazards in auxiliary power systems. The decision to replace a liquid-immersed transformer with a dry-type product has a price: higher unit cost and a need to be more vigilant in detailing transformer specifications. But, whether the change affects only one failed transformer or is part of a plant rehabilitation project, the benefits in safety can be worth it. Voltages on hydroelectric plant auxiliary power systems can range from a 20 kV medium-voltage system to the normal 480-208/120 V low-voltage system. Dry transformers typically are used in such systemsmore » to reduce the fire hazard present with liquid-filled transformers. For a hydro plant owner or engineer seeking alternatives to liquid-filled transformers, there are two main kinds of dry-type transformers to consider: vacuum pressure impregnated (VPI) and cast coil epoxy resin. VPI transformers normally are manufactured in sizes up to 6,000 kVA with primary voltage ratings up to 20 kV. Cast coil transformers can be made in sizes from 75 to 10,000 kVA, with primary voltage ratings up to 34,500 V. Although the same transformer theory applies to dry transformers as to liquid-filled units, the cooling medium, air, required different temperature rise ratings, dielectric tests, and construction techniques to ensure reliability. Consequently, the factory and field tests for dry units are established by a separate set of American National Standards Institute (ANSI)/Institute of Electrical and Electronics Engineers (IEEE) standards. Cast coil transformers have several important advantages over VPI units.« less
Methane and CO2 emissions from China's hydroelectric reservoirs: a new quantitative synthesis.
Li, Siyue; Zhang, Quanfa; Bush, Richard T; Sullivan, Leigh A
2015-04-01
Controversy surrounds the green credentials of hydroelectricity because of the potentially large emission of greenhouse gases (GHG) from associated reservoirs. However, limited and patchy data particularly for China is constraining the current global assessment of GHG releases from hydroelectric reservoirs. This study provides the first evaluation of the CO2 and CH4 emissions from China's hydroelectric reservoirs by considering the reservoir water surface and drawdown areas, and downstream sources (including spillways and turbines, as well as river downstream). The total emission of 29.6 Tg CO2/year and 0.47 Tg CH4/year from hydroelectric reservoirs in China, expressed as CO2 equivalents (eq), corresponds to 45.6 Tg CO2eq/year, which is 2-fold higher than the current GHG emission (ca. 23 Tg CO2eq/year) from global temperate hydropower reservoirs. China's average emission of 70 g CO2eq/kWh from hydropower amounts to 7% of the emissions from coal-fired plant alternatives. China's hydroelectric reservoirs thus currently mitigate GHG emission when compared to the main alternative source of electricity with potentially far great reductions in GHG emissions and benefits possible through relatively minor changes to reservoir management and design. On average, the sum of drawdown and downstream emission including river reaches below dams and turbines, which is overlooked by most studies, represents the equivalent of 42% of the CO2 and 92% of CH4 that emit from hydroelectric reservoirs in China. Main drivers on GHG emission rates are summarized and highlight that water depth and stratification control CH4 flux, and CO2 flux shows significant negative relationships with pH, DO, and Chl-a. Based on our finding, a substantial revision of the global carbon emissions from hydroelectric reservoirs is warranted.
[Impacts of hydroelectric cascade exploitation on river ecosystem and landscape: a review].
Yang, Kun; Deng, Xi; Li, Xue-Ling; Wen, Ping
2011-05-01
Hydroelectric cascade exploitation, one of the major ways for exploiting water resources and developing hydropower, not only satisfies the needs of various national economic sectors, but also promotes the socio-economic sustainable development of river basin. unavoidable anthropogenic impacts on the entire basin ecosystem. Based on the process of hydroelectric cascade exploitation and the ecological characteristics of river basins, this paper reviewed the major impacts of hydroelectric cascade exploitation on dam-area ecosystems, river reservoirs micro-climate, riparian ecosystems, river aquatic ecosystems, wetlands, and river landscapes. Some prospects for future research were offered, e.g., strengthening the research of chain reactions and cumulative effects of ecological factors affected by hydroelectric cascade exploitation, intensifying the study of positive and negative ecological effects under the dam networks and their joint operations, and improving the research of successional development and stability of basin ecosystems at different temporal and spatial scales.
Code of Federal Regulations, 2010 CFR
2010-04-01
... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... license or exemption is filed for a project located at a Government dam, as defined in section 3(10) of...
Code of Federal Regulations, 2011 CFR
2011-04-01
... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... license or exemption is filed for a project located at a Government dam, as defined in section 3(10) of...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-27
.... Name of Project: Hawks Nest Hydroelectric Project (P-2512-069) and Glen Ferris Hydroelectric Project (P... of Gauley Bridge, and Glen Ferris Hydroelectric Project is on the Kanawha River in the vicinity of the Town of Glen Ferris, both within Fayette County, West Virginia. The projects do not affect federal...
Projects, Products and Services: Celebrating 75 Years of Excellence
2009-01-01
own war against this unyielding force of nature . The 1943 spring thaw caused eight of the Missouri’s tributaries to spill over their banks. The main...generating hydroelectricity and con- tained hydraulically-placed earthfill. Therefore, the project naturally divided itself into the dam, the... natural channel and divert its water through the newly built intake structure and tunnels. This was the first use of the hydraulic placement method
Walking a tightrope: Hydro construction in environmentally sensitive areas
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gallaher, P.M.; Hansen, P.M.
Alaska's Bradley Lake hydroelectric project will begin generating electricity in September. It follows the example set by Terror Lake eight years ago of how to develop a clean, renewable energy source and, at the same time, to take care of the environment. This article describes the special precautions taken to mitigate environmental impacts during and after construction, and the cooperation necessary among the owner, state agencies, and federal agencies.
DoD Installation Energy Security: Evolving to a Smart Grid
2012-03-20
located at the Naval Air Weapons Station in China Lake, California. This series of geothermal power plants produces a peak power output of 270 megawatts...initiatives are driving the DoD to invest significantly in renewable energy resources like solar, wind, and geothermal , as well as energy efficient vehicles...hydroelectric, geothermal ) resources. The most common and largest forms of electrical generation come from power plants that use fossil fuels
NASA Astrophysics Data System (ADS)
Pande, Saket; Sharma, Ashish
2014-05-01
This study is motivated by the need to robustly specify, identify, and forecast runoff generation processes for hydroelectricity production. It atleast requires the identification of significant predictors of runoff generation and the influence of each such significant predictor on runoff response. To this end, we compare two non-parametric algorithms of predictor subset selection. One is based on information theory that assesses predictor significance (and hence selection) based on Partial Information (PI) rationale of Sharma and Mehrotra (2014). The other algorithm is based on a frequentist approach that uses bounds on probability of error concept of Pande (2005), assesses all possible predictor subsets on-the-go and converges to a predictor subset in an computationally efficient manner. Both the algorithms approximate the underlying system by locally constant functions and select predictor subsets corresponding to these functions. The performance of the two algorithms is compared on a set of synthetic case studies as well as a real world case study of inflow forecasting. References: Sharma, A., and R. Mehrotra (2014), An information theoretic alternative to model a natural system using observational information alone, Water Resources Research, 49, doi:10.1002/2013WR013845. Pande, S. (2005), Generalized local learning in water resource management, PhD dissertation, Utah State University, UT-USA, 148p.
Estimated use of water in Colorado, 1985
Litke, D.W.; Appel, C.L.
1989-01-01
Water-use data was collected for the State of Colorado as part of the U.S. Geological Survey 's National Water-Use Information Program. An estimated 20,800 million gal/day of water were used in Colorado during 1985. 89% came from surface water sources and 11% came from groundwater sources. Public supply systems provided 4% of all water used in Colorado during 1985, but provided 80% of all commercial, domestic, and industrial water used. An estimated 4,840 million gal/day of water were consumed during 1985; return flows amounted to 16,000 million gallons per day. Of all water used, 60% was used for irrigation, 35% for hydroelectric power generation, and the remaining 5% for commercial, domestic, industrial, livestock, mining, and other uses. The most water was used in Montrose (3,260 million gal/day), Mesa (1,950 million gal/day), and Gunnison (1,520 million gal/day) Counties. The predominant water uses in these counties were hydroelectric power and irrigation. (USGS)
Legal obstacles and incentives to the development of small scale hydroelectric power in New Jersey
DOE Office of Scientific and Technical Information (OSTI.GOV)
None,
1980-05-01
The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in New Jersey are described. The Federal government also exercises extensive regulatory authority in the area. The dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is discussed. New Jersey follows the riparian theory of water law. Following an extensive discussion of the New Jersey water law, New Jersey regulatory law and financial considerations regardingmore » hydroelectric power development are discussed.« less
1981-09-01
Cincinnati, Ohio 45201 9. PERFORMING ORGANIZATION NAME AND ADDRESS 10. PROGRAM ELEMENT. PROJECT, TASK AREA a WORK UNIT NUMBERS Same as No. 7 above. It...water supply, navigation and base flow stabilization; and • Insures that existing public utilization and environmental values of project lands and...Coordination Group and the Kentucky-Indiana sub-region each contained about 18 percent of the 1970 ECAR region population. The industrial sectors of
Status of wind-energy conversion
NASA Technical Reports Server (NTRS)
Thomas, R. L.; Savino, J. M.
1973-01-01
The utilization of wind energy is technically feasible as evidenced by the many past demonstrations of wind generators. The cost of energy from the wind has been high compared to fossil fuel systems. A sustained development effort is needed to obtain economical systems. The variability of the wind makes it an unreliable source on a short-term basis. However, the effects of this variability can be reduced by storage systems or connecting wind generators to fossil fuel systems, hydroelectric systems, or dispersing them throughout a large grid network. The NSF and NASA-Lewis Research Center have sponsored programs for the utilization of wind energy.
1981-08-27
kowledge and belkef -4’dleport New York .- ** ~ : ~ ’"’*tckport & Newfane Power & Water Su pp7 Cc A~’l 41924 - na. r w -Mob. -4 90- -, ..’a If -- -N n 9. 4...converting the dam to power generation is pending with the Federal Energy Regulatory Commission by: J. W. Company Jeffery Moon, President 55 Union Place...Manchester, Connecticut 06040 Tele: (207) 775-5401 f. Purpose of Dam Burt Dam was originally constructed for hydroelectric power j generation. It
Assessment of energy options for Liberia. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1983-11-01
Under funding from the U.S. Agency for International Development (USAID), the Oak Ridge National Laboratory provided energy planning assistance to the National Energy Committee of the Government of Liberia (GOL), West Africa, during a period of one year ending March 31, 1983. This report outlines the scope of activities of the joint GOL/USAID project and summarizes the major findings by Liberian and U.S. project participants. The study included and examination of current energy use by sector and fuel type, projections of future energy demands, and a preliminary evaluation of a variety of alternative energy resource and technology options for Liberia.more » The primary finding is that Liberia has significant opportunities for the substitution of indigenous energy resources for imported petroleum. The principal candidates are wood energy and hydroelectric power. The major alternatives for wood are gasification technology for small-scale electric and nonelectric applications (e.g., those under about 25-gigajoule/hour input requirements) and wood-fired steam electric generation for larger scale applications where hydroelectric power is unattractive. For major hydroelectric development the principal candidates are the St. Paul River Proposal and the Mano River Proposal. The Mano River Proposal is the smaller of the two and would meet Monrovia area electrical grid requirements and some iron ore mine demand for about the next two decades. An additional important finding of this study is that the Monrovia Petroleum refinery is highly uneconomical and should be closed and petroleum product imported directly. 25 tables.« less
National Hydroelectric Power Resources Study:Regional Assessment: Volume XXIII: Alaska and Hawaii
1981-09-01
amount of recoverable geothermal energy is still unknown, a test well (HGP-A) was drilled 6,450 feet into the eastern rift of Kilauea volcano on...US Army Corps of Engineers National Hydroelectric Power Resources Study Volume XXIII September 1 981 Regional Assessment: Alaska and Hawaii ...National Hydroelectric Power Resources Study: Final Regional Assessment; Alaska and Hawaii IS. PERFORMING ORG. REPORT NUMBER IWR 82--23 7. AUTHOR(a) 8
Analysis of Operational Data: A Proof of Concept for Assessing Electrical Infrastructure Impact
2015-11-01
cogeneration, solar, wind , geothermal, etc.) or by prime mover (i.e., steam turbine , water turbine , gas turbine , etc.). Power plants are typically...and Time SDR Sensor Data Record TRADOC U.S. Army Training and Doctrine Command UTC Coordinated Universal Time VCM VIIRS Cloud Mask VIIRS Visible...power, and other natural sources (water or wind ). The generating facilities or power plants can run by fuel (e.g., fossil fuel, hydroelectric, nuclear
Longitudinal Study of the Programs and the Organization of a Division of the Corps of Engineers.
1984-05-01
period to another as well as powerful high speed computers to expedite the analysis. Also, the abundance of completed studies of this type can be...and municipal water supply, irrigation, flood damage prevention, recreation, hydroelectric power generation and conservation of natual resources. The...inputs into outputs, they distribute the outputs, and they provide direct support to the other three functions. Emphasis is placed on the power of
141. Detail of east control panel in control room, looking ...
141. Detail of east control panel in control room, looking east. This panel contains electrical switches that were used to control valves at circular forebay. It also contains voltage regulators, synchroscope adjust field breaker, ammeters, wattmeters, temperature indicator of generator windings, and butterfly valve and governor controls. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA
Water and industry in the United States
,
1977-01-01
Man's economic and social progress depends on a plentiful and readily available supply of water. From his earliest days, man has found water to be an essential ingredient in improving his environment and the quality of life. Increased production of goods and continued introduction of new products have been accompanied by a phenomenal increase in water use. Industry, including hydroelectric power, now uses about 3 trillion gallons a day, or about seven times the average daily discharge of the Mississippi River.
1981-09-01
respectively; the Klamath Mountains of Oregon and California; the Basin and Ranges of Nevada, the Teton Range of Wyoming; the Uinta Mountains of Utah...approximately 292,000 square miles, includes all of the Columbia River system in the United States and all other river basins in Idaho, Oregon, and...Central Valley and the Los Angeles Basin of California. The western valleys of the Pacific Northwest, the Denver-Cheyenne area along the Rockies’ eastern
Electrical power generation by mechanically modulating electrical double layers.
Moon, Jong Kyun; Jeong, Jaeki; Lee, Dongyun; Pak, Hyuk Kyu
2013-01-01
Since Michael Faraday and Joseph Henry made their great discovery of electromagnetic induction, there have been continuous developments in electrical power generation. Most people today get electricity from thermal, hydroelectric, or nuclear power generation systems, which use this electromagnetic induction phenomenon. Here we propose a new method for electrical power generation, without using electromagnetic induction, by mechanically modulating the electrical double layers at the interfacial areas of a water bridge between two conducting plates. We find that when the height of the water bridge is mechanically modulated, the electrical double layer capacitors formed on the two interfacial areas are continuously charged and discharged at different phases from each other, thus generating an AC electric current across the plates. We use a resistor-capacitor circuit model to explain the results of this experiment. This observation could be useful for constructing a micro-fluidic power generation system in the near future.
Code of Federal Regulations, 2011 CFR
2011-04-01
... PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.101 Applicability... the Federal Power Act (Act), including licensing, for small hydroelectric power projects as defined in...
Code of Federal Regulations, 2014 CFR
2014-04-01
... PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.101 Applicability... the Federal Power Act (Act), including licensing, for small hydroelectric power projects as defined in...
Code of Federal Regulations, 2012 CFR
2012-04-01
... PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.101 Applicability... the Federal Power Act (Act), including licensing, for small hydroelectric power projects as defined in...
18 CFR 4.93 - Action on exemption applications.
Code of Federal Regulations, 2012 CFR
2012-04-01
... OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.93 Action on exemption... may convert the exemption application into an application for license for the hydroelectric project...
18 CFR 4.93 - Action on exemption applications.
Code of Federal Regulations, 2011 CFR
2011-04-01
... OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.93 Action on exemption... may convert the exemption application into an application for license for the hydroelectric project...
Code of Federal Regulations, 2013 CFR
2013-04-01
... PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.101 Applicability... the Federal Power Act (Act), including licensing, for small hydroelectric power projects as defined in...
18 CFR 4.93 - Action on exemption applications.
Code of Federal Regulations, 2013 CFR
2013-04-01
... OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.93 Action on exemption... may convert the exemption application into an application for license for the hydroelectric project...
18 CFR 4.93 - Action on exemption applications.
Code of Federal Regulations, 2014 CFR
2014-04-01
... OF PROJECT COSTS Exemption of Small Conduit Hydroelectric Facilities § 4.93 Action on exemption... may convert the exemption application into an application for license for the hydroelectric project...
Code of Federal Regulations, 2010 CFR
2010-04-01
... PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.101 Applicability... the Federal Power Act (Act), including licensing, for small hydroelectric power projects as defined in...
Status of wind-energy conversion
NASA Technical Reports Server (NTRS)
Thomas, R. L.; Savino, J. M.
1973-01-01
The utilization of wind energy is technically feasible as evidenced by the many past demonstrations of wind generators. The cost of energy from the wind has been high compared to fossil fuel systems; a sustained development effort is needed to obtain economical systems. The variability of the wind makes it an unreliable source on a short term basis. However, the effects of this variability can be reduced by storage systems or connecting wind generators to: (1) fossil fuel systems; (2) hydroelectric systems; or (3) dispersing them throughout a large grid network. Wind energy appears to have the potential to meet a significant amount of our energy needs.
3. Photocopy of photograph, c. 1904. INTERIOR OF ORIGINAL POWER ...
3. Photocopy of photograph, c. 1904. INTERIOR OF ORIGINAL POWER HOUSE, SHOWING A ROPE DRIVEN WARREN 450 KW, 12,000 VOLT (LATER REWOUND TO 2,200 VOLT), 3 PHASE, 60 CYCLE, A.C. GENERATOR, WITH BELT-DRIVEN WARREN 7-1/2 KW, 125 VOLT, 4 POLE, 1,150 RPM EXCITER. (Courtesy of the Potomac Edison Company Library, Historical Data Files, Dam No. 5 listing) - Dam No. 5 Hydroelectric Plant, On Potomac River, Hedgesville, Berkeley County, WV
Sholar, C.J.; Wood, P.A.
1995-01-01
Water-use information for 1990 was collected and reported, by county, for eight major categories of use. Seven of the categories were offstream uses, which included public supply, commercial, domestic, industrial, mining, thermoelectric, and agricultural uses. The agricultural category was subdivided into irrigation and livestock water use. Instream water- use data also were collected for hydroelectric-power generation. Estimated average water use in Kentucky exceeded 4,300 million gallons per day during 1990 for all offstream uses. About 94 percent of this amount was from surface-water sources, and about 6 percent was from ground-water sources. Per capita use for all offstream uses was almost 1,200 gallons per day. Estimated average consumptive use was 309 million gallons per day. Estimated average instream water use for hydroelectric-power generation was 83,000 million gallons per day. Ninety-seven percent of the offstream water withdrawals during 1990 were withdrawn for thermoelectric, public supply, and industrial use. Cooling water used in the production of thermoelectric power accounted for about 80 percent of the total offstream water use during 1990. Water withdrawn for public supplies was second largest at almost 10 percent of the total, and industrial water withdrawals were about 7 percent of the total. Thermoelectric, domestic, and livestock uses accounted for almost 90 percent of the consumptive use during 1990. The thermoelectric category accounted for almost two-thirds of the total consumptive use in the State for all uses.
Boemi, Sn; Papadopoulos, Am; Karagiannidis, A; Kontogianni, S
2010-11-01
Renewable energy sources (RES), excluding large hydroelectric plants, currently produce 4.21% of total electricity production in Greece. Even when considering the additional production from large hydroelectric plants, which accounts for some 7.8%, the distance to be covered towards the objective of 20% electricity produced from RES by 2010 and respectively towards 20% of total energy production by 2020 is discouraging. The potential, however, does exist; unfortunately so do serious barriers. On the other hand, solid waste management (SWM) is an issue that generates continuously increasing interest due to the extra amounts of solid waste generated; the lack of existing disposal facilities with adequate infrastructure and integrated management plans, also often accompanied by legislative and institutional gaps. However, socio-economic and public awareness problems are still met in the planning and implementation of RES and SWM projects, together with the lack of a complete national cadastre and a spatial development master plan, specifying areas eligible for RES and SWM development. Specific barriers occur for individual RES and the on-going inclusion of waste-derived renewable energy in the examined palette further increases the complexity of the entire issue. The consolidated study of this broad set of barriers was a main task of the present study which was carried out within the frame of a Hellenic-Canadian research project; the main results will be discussed herein.
Water Use in Georgia by County for 2005; and Water-Use Trends, 1980-2005
Fanning, Julia L.; Trent, Victoria P.
2009-01-01
Water use for 2005 for each county in Georgia was estimated using data obtained from various Federal and State agencies and local sources. Total consumptive water use also was estimated for each county in Georgia for 2005. Water use is subdivided according to offstream and instream use. Offstream use is defined as water withdrawn or diverted from a ground- or surface-water source and transported to the place of use. Estimates for offstream water use include the categories of public supply, domestic, commercial, industrial, mining, irrigation, livestock, aquaculture, and thermoelectric power. Instream use is that which occurs within a stream channel for such purposes as hydroelectric-power generation, navigation, water-quality improvement, fish propagation, and recreation. The only category of instream use estimated was hydroelectric-power generation. Georgia law (the Georgia Ground-Water Use Act of 1972 and the Georgia Water Supply Act of 1978 [Georgia Department of Natural Resources, 2008a,b]) requires any water user who withdraws more than 100,000 gallons per day on a monthly average to obtain a withdrawal permit from the Georgia Environmental Protection Division. Permit holders generally must report their withdrawals by month. The Georgia Water-Use Program collects the reported information under the withdrawal permit system and the drinking-water permit system and stores the data in the Georgia Water-Use Data System.
Distance, dams and drift: What structures populations of an endangered, benthic stream fish?
Roberts, James H.; Angermeier, Paul; Hallerman, Eric M.
2013-01-01
Spatial population structure plays an important role in species persistence, evolution and conservation. Benthic stream fishes are diverse and frequently imperilled, yet the determinants and spatial scaling of their population structure are understudied. We investigated the range-wide population genetic structure of Roanoke logperch (Percina rex), an endangered, benthic stream fish of the eastern United States. Fish were sampled from 35 sites and analysed at 11 microsatellite DNA loci. Clustering models were used to sort individuals into genetically cohesive groups and thereby estimate the spatial scaling of population structure. We then used Bayesian generalized linear mixed models (BGLMMs) to test alternative hypotheses about the environmental factors most responsible for generating structure, as measured by the differentiation statistic FST. Clustering models delineated seven discrete populations, whose boundaries coincided with agents of fragmentation, including hydroelectric dams and tailwaters. In the absence of hydrological barriers, gene flow was extensive throughout catchments, whereas there was no evidence for contemporary dispersal between catchments across barriers. In the best-supported BGLMM, FST was positively related to the spatial distance and degree of hydrological alteration between sites and negatively related to genetic diversity within sites. Whereas the effect of tailwaters was equivocal, dams strongly influenced differentiation: the effect of a dam on FST was comparable to that of a between-site distance of over 1200 km of unimpounded river. Overall, the effect of distance-mediated dispersal was negligible compared to the combined effects of fragmentation and genetic drift. The contemporary population structure of P. rex comprises a few geographically extensive ‘islands’ that are fragmented by hydroelectric projects. This information clarifies the importance of a catchment-scale perspective on conserving the species and suggests that its recovery may require genetic and/or demographic reconnection of presently isolated populations.
Rogério, J P; Santos, M A; Santos, E O
2013-11-01
For almost two decades, studies have been under way in Brazil, showing how hydroelectric reservoirs produce biogenic gases, mainly methane (CH4) and carbon dioxide (CO2), through the organic decomposition of flooded biomass. This somewhat complex phenomenon is due to a set of variables with differing levels of interdependence that directly or indirectly affect greenhouse gas (GHG) emissions. The purpose of this paper is to determine, through a statistical data analysis, the relation between CO2, CH4 diffusive fluxes and environmental variables at the Furnas, Itumbiara and Serra da Mesa hydroelectric reservoirs, located in the Cerrado biome on Brazil's high central plateau. The choice of this region was prompted by its importance in the national context, covering an area of some two million square kilometers, encompassing two major river basins (Paraná and Tocantins-Araguaia), with the largest installed power generation capacity in Brazil, together accounting for around 23% of Brazilian territory. This study shows that CH4 presented a moderate negative correlation between CO2 and depth. Additionally, a moderate positive correlation was noted for pH, water temperature and wind. The CO2 presented a moderate negative correlation for pH, wind speed, water temperature and air temperature. Additionally, a moderate positive correlation was noted for CO2 and water temperature. The complexity of the emission phenomenon is unlikely to occur through a simultaneous understanding of all the factors, due to difficulties in accessing and analyzing all the variables that have real, direct effects on GHG production and emission.
Flexible reserve markets for wind integration
NASA Astrophysics Data System (ADS)
Fernandez, Alisha R.
The increased interconnection of variable generation has motivated the use of improved forecasting to more accurately predict future production with the purpose to lower total system costs for balancing when the expected output exceeds or falls short of the actual output. Forecasts are imperfect, and the forecast errors associated with utility-scale generation from variable generators need new balancing capabilities that cannot be handled by existing ancillary services. Our work focuses on strategies for integrating large amounts of wind generation under the flex reserve market, a market that would called upon for short-term energy services during an under or oversupply of wind generation to maintain electric grid reliability. The flex reserve market would be utilized for time intervals that fall in-between the current ancillary services markets that would be longer than second-to-second energy services for maintaining system frequency and shorter than reserve capacity services that are called upon for several minutes up to an hour during an unexpected contingency on the grid. In our work, the wind operator would access the flex reserve market as an energy service to correct for unanticipated forecast errors, akin to paying the generators participating in the market to increase generation during a shortfall or paying the other generators to decrease generation during an excess of wind generation. Such a market does not currently exist in the Mid-Atlantic United States. The Pennsylvania-New Jersey-Maryland Interconnection (PJM) is the Mid-Atlantic electric grid case study that was used to examine if a flex reserve market can be utilized for integrating large capacities of wind generation in a lowcost manner for those providing, purchasing and dispatching these short-term balancing services. The following work consists of three studies. The first examines the ability of a hydroelectric facility to provide short-term forecast error balancing services via a flex reserve market, identifying the operational constraints that inhibit a multi-purpose dam facility to meet the desired flexible energy demand. The second study transitions from the hydroelectric facility as the decision maker providing flex reserve services to the wind plant as the decision maker purchasing these services. In this second study, methods for allocating the costs of flex reserve services under different wind policy scenarios are explored that aggregate farms into different groupings to identify the least-cost strategy for balancing the costs of hourly day-ahead forecast errors. The least-cost strategy may be different for an individual wind plant and for the system operator, noting that the least-cost strategy is highly sensitive to cost allocation and aggregation schemes. The latter may also cause cross-subsidies in the cost for balancing wind forecast errors among the different wind farms. The third study builds from the second, with the objective to quantify the amount of flex reserves needed for balancing future forecast errors using a probabilistic approach (quantile regression) to estimating future forecast errors. The results further examine the usefulness of separate flexible markets PJM could use for balancing oversupply and undersupply events, similar to the regulation up and down markets used in Europe. These three studies provide the following results and insights to large-scale wind integration using actual PJM wind farm data that describe the markets and generators within PJM. • Chapter 2 provides an in-depth analysis of the valuable, yet highly-constrained, energy services multi-purpose hydroelectric facilities can provide, though the opportunity cost for providing these services can result in large deviations from the reservoir policies with minimal revenue gain in comparison to dedicating the whole of dam capacity to providing day-ahead, baseload generation. • Chapter 3 quantifies the system-wide efficiency gains and the distributive effects of PJM's decision to act as a single balancing authority, which means that it procures ancillary services across its entire footprint simultaneously. This can be contrasted to Midwest Independent System Operator (MISO), which has several balancing authorities operating under its footprint. • Chapter 4 uses probabilistic methods to estimate the uncertainty in the forecast errors and the quantity of energy needed to balance these forecast errors at a certain percentile. Current practice is to use a point forecast that describes the conditional expectation of the dependent variable at each time step. The approach here uses quantile regression to describe the relationship between independent variable and the conditional quantiles (equivalently the percentiles) of the dependent variable. An estimate of the conditional density is performed, which contains information about the covariate relationship of the sign of the forecast errors (negative for too much wind generation and positive for too little wind generation) and the wind power forecast. This additional knowledge may be implemented in the decision process to more accurately schedule day-ahead wind generation bids and provide an example for using separate markets for balancing an oversupply and undersupply of generation. Such methods are currently used for coordinating large footprints of wind generation in Europe.
50 CFR 223.301 - Special rules-marine and anadromous fishes.
Code of Federal Regulations, 2013 CFR
2013-10-01
... their behalf for the purpose of monitoring and evaluating the Opal Springs Hydroelectric Project (FERC... maintenance of the Opal Springs Hydroelectric Project (FERC Project No. 5891) as administered under a license...
WHEELROOM (TURBINE ROOM), LOOKING WEST TOWARD PENSTOCK FOR #2 AND ...
WHEELROOM (TURBINE ROOM), LOOKING WEST TOWARD PENSTOCK FOR #2 AND #1 TURBINES. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA
INTERIOR DETAIL VIEW OF CASING FOR FRANCIS WATER WHEEL (TURBINE ...
INTERIOR DETAIL VIEW OF CASING FOR FRANCIS WATER WHEEL (TURBINE #2). PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA
Washington Water Power Spokane River Upper Falls Hydroelectric Development, Gate ...
Washington Water Power Spokane River Upper Falls Hydroelectric Development, Gate House, Spokane River, approximately 0.5 mile northeast of intersection of Spokane Falls Boulevard & Post Street, Spokane, Spokane County, WA
Water resources of Lincoln County, Wyoming
Eddy-Miller, C. A.; Plafcan, Maria; Clark, M.L.
1996-01-01
Streamflow and ground-water quantity and quality data were collected and analyzed, 1993 through 1995, and historical data were compiled to summarize the water resources of Lincoln County.Deposits of Quaternary age, in the valleys of the Bear River and Salt River, had the most well development of any geologic unit in the county.The most productive alluvial aquifers were located in the Bear River Valley and Star Valley with pumping wells discharging up to 2,000 gallons perminute. The ground-water connection between the Overthrust Belt and the Green River Basin is restricted as a result of the folding and faulting that occurred during middle Mesozoic and early Cenozoic time. Total water use in Lincoln County during 1993 was estimated to be 405,000 million gallons. Surface water was the source for 98 percent of the water used in the county. Hydroelectric power generation and irrigation used the largest amounts of water. Dissolved-solids concentrations varied greatly for water samples collected from 35 geologic units inventoried. Dissolved-solids concentrations in all water samples from the LaneyMember of the Green River Formation were greater than the Secondary Maximum Contaminant Level of 500 milligrams per liter established by the U.S. Environmental Protection Agency. Statistical analysis of data collected from wells in the Star Valley monitoring study indicated there was no significant difference between data collected during different seasons, and no correlation between the nitrate concentrations and depth to ground water.
An application of extreme value theory to the management of a hydroelectric dam.
Minkah, Richard
2016-01-01
Assessing the probability of very low or high water levels is an important issue in the management of hydroelectric dams. In the case of the Akosombo dam, very low and high water levels result in load shedding of electrical power and flooding in communities downstream respectively. In this paper, we use extreme value theory to estimate the probability and return period of very low water levels that can result in load shedding or a complete shutdown of the dam's operations. In addition, we assess the probability and return period of high water levels near the height of the dam and beyond. This provides a framework for a possible extension of the dam to sustain the generation of electrical power and reduce the frequency of spillage that causes flooding in communities downstream. The results show that an extension of the dam can reduce the probability and prolong the return period of a flood. In addition, we found a negligible probability of a complete shutdown of the dam due to inadequate water level.
3. SWIMMING POOL. VIEW TO SOUTHEAST. Rainbow Hydroelectric Facility, ...
3. SWIMMING POOL. VIEW TO SOUTHEAST. - Rainbow Hydroelectric Facility, Swimming Pool, On north bank of Missouri River 2 miles Northeast of Great Falls, & end of Rainbow Dam Road, Great Falls, Cascade County, MT
1. SWIMMING POOL. VIEW TO WEST. Rainbow Hydroelectric Facility, ...
1. SWIMMING POOL. VIEW TO WEST. - Rainbow Hydroelectric Facility, Swimming Pool, On north bank of Missouri River 2 miles Northeast of Great Falls, & end of Rainbow Dam Road, Great Falls, Cascade County, MT
2. SWIMMING POOL. VIEW TO SOUTHEAST. Rainbow Hydroelectric Facility, ...
2. SWIMMING POOL. VIEW TO SOUTHEAST. - Rainbow Hydroelectric Facility, Swimming Pool, On north bank of Missouri River 2 miles Northeast of Great Falls, & end of Rainbow Dam Road, Great Falls, Cascade County, MT
Washington Water Power Spokane River Upper Falls Hydroelectric Development, Gates ...
Washington Water Power Spokane River Upper Falls Hydroelectric Development, Gates & Gate-Lifting Mechanisms, Spokane River, approximately 0.5 mile northeast of intersection of Spokane Falls Boulevard & Post Street, Spokane, Spokane County, WA
18 CFR 4.105 - Action on exemption applications.
Code of Federal Regulations, 2010 CFR
2010-04-01
... DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.105... exemption of a small hydroelectric power project from provisions of Part I of the Act other than the...
18 CFR 4.105 - Action on exemption applications.
Code of Federal Regulations, 2013 CFR
2013-04-01
... DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.105... exemption of a small hydroelectric power project from provisions of Part I of the Act other than the...
18 CFR 4.105 - Action on exemption applications.
Code of Federal Regulations, 2012 CFR
2012-04-01
... DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.105... exemption of a small hydroelectric power project from provisions of Part I of the Act other than the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-12
... a Programmatic Agreement for Managing Properties Included in or Eligible for Inclusion in the... for inclusion in, the National Register of Historic Places at the Martin Dam Hydroelectric Project...
1988-10-01
hydroelectric power companies set across the St. Lawrence River in early winter to ensure dependable electric power generation in winter. One scheme was to...leave part of the boom open, but connected, and pull it closed after the last ship passed through using an electric winch mounted on a cell structure...needing a supplemntal safety loop. It was electrically operated, submersible, sensitive, and fairly light. Eventually the tension link design, including
1984-09-21
largest planned among all the dams completed in Burma. On the course of the Pan-laung river there is a series of dams built by the old kings of Burma...far completed in Burma. The intention of the plans for the Kinda storage dam is that at a distance of 9 miles above the present Kinda dam a storage...with these parallel intentions . For generation of hydroelectric power it is intended to include in the main dam a penstock 1,525 feet long and 24
Arab energy: prospects to 2000
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1982-01-01
The energy situation of 21 Arab countries for the period between 1960 and 2000 is examined. Attempts to forecast the demand and supply of energy in the Arab world for 1985, 1990 and 2000 are discussed. Following a description of the methodology employed, crude petroleum, petroleum production, natural gas and electricity are explored in detail. The national programs of the Arab countries for electric-power generation include conventional thermal electricity, hydroelectricity, nuclear power, solar energy, biomass conversion, and geothermal and wind energy. 23 references.
NASA Astrophysics Data System (ADS)
Herrera-Estrada, J. E.; Sheffield, J.
2016-12-01
The electricity sector relies heavily on water, as it is needed for hydroelectric generation and to cool thermoelectric power plants. Droughts decrease river and reservoir levels, reducing the affected region's capacity for electricity generation. These cuts in electricity supply have to be replaced by more expensive alternatives with potentially higher associated greenhouse gas emissions (e.g. coal, natural gas, or imports) to meet the region's demand. To date, the quantification of the impacts of droughts on the electricity sector tends to be restricted to individual events, such as the recent California drought. In this work, the impacts of droughts on electricity prices paid by consumers and on greenhouse gas emissions from the electricity sector are calculated over the American West from 2001 to 2014 using monthly data. This region was selected because it falls within the Western Interconnection power grid, because of its important reliance on hydropower, and because it has large areas that are vulnerable to droughts due to their semi-arid climates. Furthermore, this regional approach allows us to quantify the effects of non-local droughts, i.e. droughts in neighboring states that affect electricity imports into a given state. Results show large heterogeneities in the effects of droughts across the region, given the diversity of energy sources used in each state. As expected, the effect of a local drought event on hydroelectricity is largest in California, Oregon, and Washington since they have the highest hydropower capacity. California and Oregon tend to replace a large portion of their lost hydroelectricity with natural gas, while Washington appears to rely more on imports from its neighbors. On the other hand, Montana, Nevada, and Utah, tend to rely more heavily on coal. The results also show that consumers in the residential, commercial, and industrial sectors may sometimes pay millions of dollars more for their electricity use at the state level due to the effects of a drought on the state's energy mix, as has been the case in California.
14. Station Control Batteries and Battery Chargers, view to the ...
14. Station Control Batteries and Battery Chargers, view to the northeast. The original battery charger is the center cabinet on the left side of photograph, with the new charger on the far left of photograph and a circuit breaker unit for the chargers is visible in the center of the photograph. The batteries are visible on three racks through the open doorway. - Washington Water Power Clark Fork River Cabinet Gorge Hydroelectric Development, Powerhouse, North Bank of Clark Fork River at Cabinet Gorge, Cabinet, Bonner County, ID
17. Governor Accumulator Tank Compressor and motor located along rear ...
17. Governor Accumulator Tank Compressor and motor located along rear corridor between Units 3 and 4, view to the west. The compressor motor is located just right of center in photograph. The pressure tank on the right side of the photograph is a reserve pressure tank for governor system. The pressure tank on the left side of the photograph is the original instrument air pressure tank. - Washington Water Power Clark Fork River Noxon Rapids Hydroelectric Development, Powerhouse, South bank of Clark Fork River at Noxon Rapids, Noxon, Sanders County, MT
Deer Creek Dam, Hydroelectric Powerplant, 868 feet/291 degrees from intersection ...
Deer Creek Dam, Hydroelectric Powerplant, 868 feet/291 degrees from intersection of dam complex access road with U.S. Highway 189, 1,340 feet/352 degrees from the dam spillway overpass, Charleston, Wasatch County, UT
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-16
... Drum-Spaulding and Yuba-Bear Hydroelectric Projects On May 17, 2013, the Commission issued a Notice of Availability of the Draft Environmental Impact Statement for the Drum-Spaulding and Yuba-Bear Hydroelectric...
NASA Astrophysics Data System (ADS)
Uluca, Basak
This dissertation aims to achieve two goals. The first is to model the strategic interactions of firms that own cascaded reservoir-hydro plants in oligopolistic and mixed oligopolistic hydrothermal electricity generation markets. Although competition in thermal generation has been extensively modeled since the beginning of deregulation, the literature on competition in hydro generation is still limited; in particular, equilibrium models of oligopoly that study the competitive behavior of firms that own reservoir-hydro plants along the same river in hydrothermal electricity generation markets are still under development. In competitive markets, when the reservoirs are located along the same river, the water released from an upstream reservoir for electricity generation becomes input to the immediate downstream reservoir, which may be owned by a competitor, for current or future use. To capture the strategic interactions among firms with cascaded reservoir-hydro plants, the Upstream-Conjecture approach is proposed. Under the Upstream-Conjecture approach, a firm with an upstream reservoir-hydro plant assumes that firms with downstream reservoir-hydro plants will respond to changes in the upstream firm's water release by adjusting their water release by the same amount. The results of the Upstream Conjecture experiments indicate that firms that own upstream reservoirs in a cascade may have incentive to withhold or limit hydro generation, forcing a reduction in the utilization of the downstream hydro generation plants that are owned by competitors. Introducing competition to hydroelectricity generation markets is challenging and ownership allocation of the previously state-owned cascaded reservoir-hydro plants through privatization can have significant impact on the competitiveness of the generation market. The second goal of the dissertation is to extract empirical guidance about best policy choices for the ownership of the state-owned generation plants, including the cascaded reservoir-hydro plants. Specifically, an equilibrium model of oligopoly, where only private firms compete for electricity supply is proposed. Since some electricity generation markets are better characterized as mixed oligopolies, where the public firm coexists with the private firms for electricity supply, and not as oligopolies, another equilibrium model of mixed oligopoly is proposed. The proposed mixed oligopoly equilibrium model is the first implementation of such market structure in electricity markets. The mathematical models developed in this research are applied to the simplified representation of the Turkish electricity generation market to investigate the impact of various ownership allocation scenarios that may result from the privatization of the state owned generation plants, including the cascaded reservoir-hydro plants, on the competitive market outcomes.
McDougall, Craig A.; Welsh, Amy B.; Gosselin, Thierry; Anderson, W. Gary; Nelson, Patrick A.
2017-01-01
Many hydroelectric dams have been in place for 50 - >100 years, which for most fish species means that enough generations have passed for fragmentation induced divergence to have accumulated. However, for long-lived species such as Lake Sturgeon, Acipenser fulvescens, it should be possible to discriminate between historical population structuring and contemporary gene flow and improve the broader understanding of anthropogenic influence. On the Winnipeg River, Manitoba, two hypotheses were tested: 1) Measureable quantities of former reservoir dwelling Lake Sturgeon now reside downstream of the Slave Falls Generating Station, and 2) genetically differentiated populations of Lake Sturgeon occur upstream and downstream, a result of historical structuring. Genetic methods based on ten microsatellite markers were employed, and simulations were conducted to provide context. With regards to contemporary upstream to downstream contributions, the inclusion of length-at-age data proved informative. Both pairwise relatedness and Bayesian clustering analysis substantiated that fast-growing outliers, apparently entrained after residing in the upstream reservoir for several years, accounted for ~15% of the Lake Sturgeon 525–750 mm fork length captured downstream. With regards to historical structuring, upstream and downstream populations were found to be differentiated (FST = 0.011, and 0.013–0.014 when fast-growing outliers were excluded), and heterozygosity metrics were higher for downstream versus upstream juveniles. Historical asymmetric (downstream) gene flow in the vicinity of the generating station was the most logical explanation for the observed genetic structuring. In this section of the Winnipeg River, construction of a major dam does not appear to have fragmented a previously panmictic Lake Sturgeon population, but alterations to habitat may be influencing upstream to downstream contributions in unexpected ways. PMID:28329005
McDougall, Craig A; Welsh, Amy B; Gosselin, Thierry; Anderson, W Gary; Nelson, Patrick A
2017-01-01
Many hydroelectric dams have been in place for 50 - >100 years, which for most fish species means that enough generations have passed for fragmentation induced divergence to have accumulated. However, for long-lived species such as Lake Sturgeon, Acipenser fulvescens, it should be possible to discriminate between historical population structuring and contemporary gene flow and improve the broader understanding of anthropogenic influence. On the Winnipeg River, Manitoba, two hypotheses were tested: 1) Measureable quantities of former reservoir dwelling Lake Sturgeon now reside downstream of the Slave Falls Generating Station, and 2) genetically differentiated populations of Lake Sturgeon occur upstream and downstream, a result of historical structuring. Genetic methods based on ten microsatellite markers were employed, and simulations were conducted to provide context. With regards to contemporary upstream to downstream contributions, the inclusion of length-at-age data proved informative. Both pairwise relatedness and Bayesian clustering analysis substantiated that fast-growing outliers, apparently entrained after residing in the upstream reservoir for several years, accounted for ~15% of the Lake Sturgeon 525-750 mm fork length captured downstream. With regards to historical structuring, upstream and downstream populations were found to be differentiated (FST = 0.011, and 0.013-0.014 when fast-growing outliers were excluded), and heterozygosity metrics were higher for downstream versus upstream juveniles. Historical asymmetric (downstream) gene flow in the vicinity of the generating station was the most logical explanation for the observed genetic structuring. In this section of the Winnipeg River, construction of a major dam does not appear to have fragmented a previously panmictic Lake Sturgeon population, but alterations to habitat may be influencing upstream to downstream contributions in unexpected ways.
Estimated water use in Montana in 2000
Cannon, M.R.; Johnson, Dave R.
2004-01-01
The future health and economic welfare of Montana's population is dependent on a continuing supply of fresh water. Montana's finite water resources are being stressed by increasing water withdrawals and instream-flow requirements. Various water managers in Montana need comprehensive, current, and detailed water-use data to quantify current stresses and estimate and plan for future water needs. This report summarizes selected water-use data for all of Montana's counties and stream basins to help meet those needs. In 2000, the citizens of Montana withdrew and used about 10,749 million gallons per day (Mgal/d) of water from Montana's streams and aquifers. Withdrawals from surface water were about 10,477 Mgal/d and withdrawals from ground water were about 272 Mgal/d. Agricultural irrigation accounted for about 10,378 Mgal/d or about 96.5 percent of total withdrawals for all uses. Withdrawals for public supply were about 136 Mgal/d, self-supplied domestic withdrawals were about 23 Mgal/d, self-supplied industrial withdrawals were about 61 Mgal/d, withdrawals for thermoelectric power generation were about 110 Mgal/d, and withdrawals for livestock were about 41 Mgal/d. Total consumptive use of water in 2000 was about 2,370 Mgal/d, of which about 2,220 Mgal/d (93.6 percent) was for agricultural irrigation. Instream uses of water included hydroelectric power generation and maintenance of instream flows for conservation of wildlife and aquatic life, and for public recreational purposes. In 2000, about 74,486 Mgal/d was used at hydroelectric plants for generation of about 11,591 gigawatt-hours of electricity. Evaporation from large water bodies, although not a classified water use, accounts for a large loss of water in some parts of the State. Net evaporation from Montana's 60 largest reservoirs and regulated lakes averaged about 891 Mgal/d.
Local Economic Development and Hydropower Along the Brahmaputra River Basin in Northeast India
NASA Astrophysics Data System (ADS)
Mock, A.
2014-12-01
Large dams have long been controversial. They offer benefits, such as reduced greenhouse gas emissions, energy security, and local development, yet produce negative social and ecological impact, such as wildlife habitat destruction, human displacement, and the disruption of downstream fishing or agricultural industries. In the past decade, the Indian government has signed Memoranda of Understanding with hydroelectric power companies for the building of over 130 large dams on the Brahmaputra River in the state of Arunachal Pradesh in Northeast India. These dams can generate 43% of India's assessed hydropower potential to sustain India's growing economy. In addition, the Indian government claims that these dams will bring local development with needed jobs. However, local Arunachali people have protested and temporarily halted hydropower projects because of the impact of dams on their existing livelihoods. Using the North Eastern Electric Power Corporation's (NEEPCO) Ranganadi Hydroelectric Project as a case study, our project examined whether dams in Northeast India provide jobs for local people, and whether distance from the dam or work colony to a worker's hometown affects the type of job the worker received. Survey data from residents at NEEPCO's work colony in Doimukh, Arunachal Pradesh, was analyzed using SPSS (n = 18). Our research found that 100% of workers at the dam originally resided in Northeast India, with 33% from Arunachal Pradesh, and 67% from the nearby states of Assam, and Tripura. Further, our analysis revealed no statistically significant relationship between the distance to a worker's hometown and job type (p = .609). Where workers come from did not affect the type of job they received. More research using a larger sample size and additional hydroelectric project case studies is needed to further explore the relationship between worker home location and their job types.
An Investigation of Health and Safety Measures in a Hydroelectric Power Plant.
Acakpovi, Amevi; Dzamikumah, Lucky
2016-12-01
Occupational risk management is known as a catalyst in generating superior returns for all stakeholders on a sustainable basis. A number of companies in Ghana implemented health and safety measures adopted from international companies to ensure the safety of their employees. However, there exist great threats to employees' safety in these companies. The purpose of this paper is to investigate the level of compliance of Occupational Health and Safety management systems and standards set by international and local legislation in power producing companies in Ghana. The methodology is conducted by administering questionnaires and in-depth interviews as measuring instruments. A random sampling technique was applied to 60 respondents; only 50 respondents returned their responses. The questionnaire was developed from a literature review and contained questions and items relevant to the initial research problem. A factor analysis was also carried out to investigate the influence of some variables on safety in general. Results showed that the significant factors that influence the safety of employees at the hydroelectric power plant stations are: lack of training and supervision, non-observance of safe work procedures, lack of management commitment, and lack of periodical check on machine operations. The study pointed out the safety loopholes and therefore helped improve the health and safety measures of employees in the selected company by providing effective recommendations. The implementation of the proposed recommendations in this paper, would lead to the prevention of work-related injuries and illnesses of employees as well as property damage and incidents in hydroelectric power plants. The recommendations may equally be considered as benchmark for the Safety and Health Management System with international standards.
NASA Astrophysics Data System (ADS)
Kaplan, D. A.; Livino, A.; Arias, M. E.; Crouch, T. D.; Anderson, E.; Marques, E.; Dutka-Gianelli, J.
2017-12-01
The Amazon River watershed is the world's largest river basin and provides US$30 billion/yr in ecosystem services to local populations, national societies, and humanity at large. The Amazon is also a relatively untapped source of hydroelectricity for Latin America, and construction of >30 large hydroelectric dams and >170 small dams is currently underway. Hydropower development will have a cascade of physical, ecological, and social effects at local to global scales. While Brazil has well-defined environmental impact assessment and mitigation programs, these efforts often fail to integrate data and knowledge across disciplines, sectors, and societies throughout the dam planning process. Resulting failures of science, policy, and management have had widespread environmental, economic, and social consequences, highlighting the need for an improved theoretical and practical framework for understanding the impacts of Amazon dams and guiding improved management that respects the needs and knowledge of diverse set of stakeholders. We present a conceptual framework that links four central goals: 1) connecting research in different disciplines (interdisciplinarity); 2) incorporating new knowledge into decision making (adaptive management); 3) including perspectives and participation of non-academic participants in knowledge generation (transdisciplinarity); and 4) extending the idea of environmental flows ("how much water does a river need?") to better consider human uses and users through the concept of fluvial anthropology ("how much water does a society need?"). We use this framework to identify opportunities for improved integration strategies within the (Brazilian) hydroelectric power plant planning and implementation "lifecycle." We applied this approach to the contentious Belo Monte dam, where compliance with regulatory requirements, including monitoring for environmental flows, exemplifies the opportunity for applying adaptive management, but also highlights an urgent need for much improved communication with and participation of affected communities.
Sholar, C.J.; Lee, V.D.
1988-01-01
Water use information for 1985 was collected and reported by county for eight major categories of use. Seven of the categories were offstream uses, which included (1) public supply , (2) commercial, (3) domestic, (4) industrial, (5) mining, (6) thermoelectric, and (7) agricultural uses. The agricultural uses category was separated into irrigation and livestock water use. Instream water-use data also were collected for hydroelectric power generation. Water use in Kentucky was estimated to average 4,200 million gallons per day (M gal/d) during 1985 for all offstream uses. About 95% of this amount was from surface water sources, and about 5% was from groundwater sources. Per capita use for all offstream uses was about 1,100 gal/day. About 260 M gal/d was consumed (not returned to the surface--or groundwater system). Instream water use for hydroelectric power generation was estimated to be 91,000 M gal/d. Almost 97% of the offstream water withdrawals in 1985 were withdrawn for thermoelectric, public supply, and industrial use. Cooling water used in the production of thermoelectric power accounted for about 81% of the total offstream water use in 1985. Water withdrawn for public supplies was the second largest offstream use at about 10 % of the total, and industrial water use was almost 6%. Thermoelectric, domestic, and livestock uses accounted for almost 90% of the consumptive use in 1985. Consumptive use in the thermoelectric category was almost one-half of the total amount consumed in the State for all uses. (USGS)
Sedimentation survey of Lago Dos Bocas, Utuado, Puerto Rico, January 2010
Soler-López, Luis R.
2014-01-01
Lago Dos Bocas reservoir was completed in 1942 to provide water for hydroelectric power generation along the northern coast of Puerto Rico. The reservoir had an original storage capacity of 37.50 million cubic meters (Mm3). The dam is located about 9 kilometers (km) northeast of the town of Utuado, immediately downstream of the original confluence of the Río Grande de Arecibo and the Río Caonillas (fig. 1). The Puerto Rico Electric Power Authority (PREPA) owns and operates the Lago Dos Bocas reservoir, and since 1996, the reservoir has become an essential part of the Puerto Rico Aqueduct and Sewer Authority (PRASA) North Coast Superaqueduct Project. The Superaqueduct is supplied by controlled releases for hydroelectric power generation that replenish the public-supply raw-water intake pool located about 10 km downstream from the Lago Dos Bocas Dam (fig. 1). As of 2005, the Superaqueduct supplies about 4.03 cubic meters per second (m3/s) (348,192 cubic meters per day [m3/d]) of potable water to communities along the northern coast, from Arecibo to the San Juan metropolitan area. Because of the importance of the reservoir to the North Coast Superaqueduct, the U.S. Geological Survey (USGS), in cooperation with PRASA, conducted a sedimentation survey of Lago Dos Bocas in January 2009. The results of this survey were used to estimate the useful life and the firm yield of the reservoir, and evaluate the need to dredge the reservoir.
NASA Astrophysics Data System (ADS)
Saounatsou, Chara; Georgi, Julia
2014-08-01
The Polyphyto Hydroelectric Project was constructed in 1974 and it has been operating since on the Aliakmonas River, Kozani prefecture, by the Greek Public Power Corporation. The construction of the Ilarion Hydroelectric Project, upstream from the Polyphyto Reservoir, has been recently completed and will start operating in the near future. Apart from hydroelectric power production, the Polyphyto reservoir provides flood control to the areas below the Polyphyto dam. It is also used to manage water provision to the city of Thessaloniki and adjacent agricultural plain, providing at the same time cooling water to the Thermo Electric Projects in Ptolemaida. The Polyphyto reservoir has potential for further development as an economic fulcrum to the region in which is located. The Kozani and Servia-Velvendos Municipalities have proceeded to the construction of several touristic, nautical - athletic and fishing projects. In order to promote such developments, while preserving the artificial wetland, flora and fauna of the Polyphyto Reservoir, it is important to reduce the fluctuation of the reservoir elevation which according to its technical characteristics is 21m. The aim of this paper is to propose the combined operation of the two Hydroelectric Project reservoirs to satisfy all the present Polyphyto Hydroelectric Project functions and to reduce the annual fluctuation of the Polyphyto Reservoir. The HEC-5, Version 8 / 1998 computer model was used in our calculations, as developed by the Hydrologic Engineering Center (HEC) of the US Army Corps of Engineers for reservoir operation simulation. Five possible operation scenarios are tested in this paper to show that the present fluctuation of the Polyphyto Reservoir can be reduced, with some limitations, except during dry weather periods.
Using fire dynamics simulator to reconstruct a hydroelectric power plant fire accident.
Chi, Jen-Hao; Wu, Sheng-Hung; Shu, Chi-Min
2011-11-01
The location of the hydroelectric power plant poses a high risk to occupants seeking to escape in a fire accident. Calculating the heat release rate of transformer oil as 11.5 MW/m(2), the fire at the Taiwan Dajia-River hydroelectric power plant was reconstructed using the fire dynamics simulator (FDS). The variations at the escape route of the fire hazard factors temperature, radiant heat, carbon monoxide, and oxygen were collected during the simulation to verify the causes of the serious casualties resulting from the fire. The simulated safe escape time when taking temperature changes into account is about 236 sec, 155 sec for radiant heat changes, 260 sec for carbon monoxide changes, and 235-248 sec for oxygen changes. These escape times are far less than the actual escape time of 302 sec. The simulation thus demonstrated the urgent need to improve escape options for people escaping a hydroelectric power plant fire. © 2011 American Academy of Forensic Sciences.
Restoring Natural Streamflow Variability by Modifying Multi-purpose Reservoir Operation
NASA Astrophysics Data System (ADS)
Shiau, J.
2010-12-01
Multi-purpose reservoirs typically provide benefits of water supply, hydroelectric power, and flood mitigation. Hydroelectric power generations generally do not consume water. However, temporal distribution of downstream flows is highly changed due to hydro-peaking effects. Associated with offstream diversion of water supplies for municipal, industrial, and agricultural requirements, natural streamflow characteristics of magnitude, duration, frequency, timing, and rate of change is significantly altered by multi-purpose reservoir operation. Natural flow regime has long been recognized a master factor for ecosystem health and biodiversity. Restoration of altered flow regime caused by multi-purpose reservoir operation is the main objective of this study. This study presents an optimization framework that modifying reservoir operation to seeking balance between human and environmental needs. The methodology presented in this study is applied to the Feitsui Reservoir, located in northern Taiwan, with main purpose of providing stable water-supply and auxiliary purpose of electricity generation and flood-peak attenuation. Reservoir releases are dominated by two decision variables, i.e., duration of water releases for each day and percentage of daily required releases within the duration. The current releasing policy of the Feitsui Reservoir releases water for water-supply and hydropower purposes during 8:00 am to 16:00 pm each day and no environmental flows releases. Although greater power generation is obtained by 100% releases distributed within 8-hour period, severe temporal alteration of streamflow is observed downstream of the reservoir. Modifying reservoir operation by relaxing these two variables and reserve certain ratio of streamflow as environmental flow to maintain downstream natural variability. The optimal reservoir releasing policy is searched by the multi-criterion decision making technique for considering reservoir performance in terms of shortage ratio and power generation and downstream hydrologic alterations in terms of ecological relevant indicators. The results show that the proposed methodology can mitigate hydro-peaking effects on natural variability, while maintains efficient reservoir operation.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-02
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Klamath Hydroelectric Settlement Agreement, Including Secretarial Determination on Whether To Remove Four Dams on the Klamath River in California and Oregon AGENCY: Department of the Interior. ACTION: Notice; correction. SUMMARY: The Department of the...
7. Photocopied August 1971 from Photo 13729, Granite Station Special ...
7. Photocopied August 1971 from Photo 13729, Granite Station Special Folder, Engineering Department, Utah Power and Light Co., Salt Lake City, Utah. GRANITE HYDRO-ELECTRIC PLANT (1500KW) STATION. PENSTOCK AND SPILWAY, NOVEMBER 1914. - Utah Power Company, Granite Hydroelectric Plant, Holladay, Salt Lake County, UT
8. Photocopied August 1971 from Photo 11479, Granite Station Special ...
8. Photocopied August 1971 from Photo 11479, Granite Station Special Folder, Engineering Department, Utah Power and Light Co., Salt Lake City, Utah. GRANITE HYDRO-ELECTRIC PLANT (1500 KW) STATION. PENSTOCK AND SPILWAY, NOVEMBER 1914. - Utah Power Company, Granite Hydroelectric Plant, Holladay, Salt Lake County, UT
78 FR 48661 - Application for Presidential Permit; Soule River Hydroelectric Project: Correction
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-09
... Hydroelectric Project: Correction AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of Application; correction. SUMMARY: The Department of Energy (DOE) Office of Electricity Delivery..., Office of Electricity Delivery and Energy Reliability (OE-20), U.S. Department of Energy, 1000...
Energy Perspective: Is Hydroelectricity Green?
ERIC Educational Resources Information Center
Childress, Vincent W.
2009-01-01
The current worldwide concern over energy is primarily related to imported oil, oil drilling and refining capacity, and transportation capacity. However, this concern has bolstered interest in a broader range of "green" energy technologies. In this article, the author discusses the use of hydroelectricity as an alternative energy source…
7. Photocopied August 1971 from Photo 11480, Stairs Station Special ...
7. Photocopied August 1971 from Photo 11480, Stairs Station Special Folder, Engineering Department, Utah Power and Light Co., Salt Lake City, Utah. STAIRS HYDRO-ELECTRIC PLANT (1600 KW) STATION AND PENSTOCK, NOVEMBER 1914. - Utah Power & Light Company, Stairs Hydroelectric Station, Holladay, Salt Lake County, UT
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-28
... telephone. The FERC contact for the Saluda Hydroelectric Project is Lee Emery. Please call Lee Emery at (202) 502-8379 by 4 p.m. EST, June 11, 2010, or by e-mail at lee[email protected] , to receive specific...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lansey, Kevin; Hortsman, Chris
2016-10-01
In this study, the preliminary feasibility of a hybrid solar and modular pumped storage system designed for high energy independence at Biosphere 2 is assessed. The system consists of an array of solar PV panels that generate electricity during the day to power both Biosphere 2 and a pump that sends water through a pipe to a tank at a high elevation. When solar power is not available, the water is released back down the pipe towards a tank at a lower elevation, where it passes through a hydraulic water turbine to generate hydroelectricity to power Biosphere 2. The hybridmore » system is sized to generate and store enough energy to enable Biosphere 2 to operate without a grid interconnection on an average day.« less
Estimated water use in Puerto Rico, 2010
Molina-Rivera, Wanda L.
2014-01-01
Water-use data were aggregated for the 78 municipios of the Commonwealth of Puerto Rico for 2010. Five major offstream categories were considered: public-supply water withdrawals and deliveries, domestic and industrial self-supplied water use, crop-irrigation water use, and thermoelectric-power freshwater use. One instream water-use category also was compiled: power-generation instream water use (thermoelectric saline withdrawals and hydroelectric power). Freshwater withdrawals for offstream use from surface-water [606 million gallons per day (Mgal/d)] and groundwater (118 Mgal/d) sources in Puerto Rico were estimated at 724 million gallons per day. The largest amount of freshwater withdrawn was by public-supply water facilities estimated at 677 Mgal/d. Public-supply domestic water use was estimated at 206 Mgal/d. Fresh groundwater withdrawals by domestic self-supplied users were estimated at 2.41 Mgal/d. Industrial self-supplied withdrawals were estimated at 4.30 Mgal/d. Withdrawals for crop irrigation purposes were estimated at 38.2 Mgal/d, or approximately 5 percent of all offstream freshwater withdrawals. Instream freshwater withdrawals by hydroelectric facilities were estimated at 556 Mgal/d and saline instream surface-water withdrawals for cooling purposes by thermoelectric-power facilities was estimated at 2,262 Mgal/d.
Estimated Water Use in Puerto Rico, 2005
Molina-Rivera, Wanda L.; Gómez-Gómez, Fernando
2008-01-01
Water-use data were compiled for the 78 municipios of the Commonwealth of Puerto Rico for 2005. Five offstream categories were considered: public-supply water withdrawals and deliveries, domestic self-supplied water use, industrial self-supplied ground-water withdrawals, crop irrigation water use, and thermoelectric power freshwater use. One water-use category also was considered: power-generation instream water use (thermoelectric-saline withdrawals and hydroelectric power). Freshwater withdrawals and deliveries for offstream use from surface- and ground-water sources in Puerto Rico were estimated at 712 million gallons per day (Mgal/d). The largest amount of freshwater withdrawn was by public-supply water facilities and was estimated at 652 Mgal/d. The public-supply domestic water use was estimated at 347 Mgal/d. Fresh surface- and ground-water withdrawals by domestic self-supplied users were estimated at 2.1 Mgal/d and the industrial self-supplied withdrawals were estimated at 9.4 Mgal/d. Withdrawals for crop irrigation purposes were estimated at 45.2 Mgal/d, or approximately 6.3 percent of all offstream freshwater withdrawals. Instream freshwater withdrawals by hydroelectric facilities were estimated at 568 Mgal/d and saline instream surface-water withdrawals for cooling purposes by thermoelectric-power facilities was estimated at 2,288 Mgal/d.
Essays in Applied Microeconomics
NASA Astrophysics Data System (ADS)
Severnini, Edson Roberto
This dissertation consists of three studies analyzing causes and consequences of location decisions by economic agents in the U.S. In Chapter 1, I address the longstanding question of the extent to which the geographic clustering of economic activity may be attributable to agglomeration spillovers as opposed to natural advantages. I present evidence on this question using data on the long-run effects of large scale hydroelectric dams built in the U.S. over the 20th century, obtained through a unique comparison between counties with or without dams but with similar hydropower potential. Until mid-century, the availability of cheap local power from hydroelectric dams conveyed an important advantage that attracted industry and population. By the 1950s, however, these advantages were attenuated by improvements in the efficiency of thermal power generation and the advent of high tension transmission lines. Using a novel combination of synthetic control methods and event-study techniques, I show that, on average, dams built before 1950 had substantial short run effects on local population and employment growth, whereas those built after 1950 had no such effects. Moreover, the impact of pre-1950 dams persisted and continued to grow after the advantages of cheap local hydroelectricity were attenuated, suggesting the presence of important agglomeration spillovers. Over a 50 year horizon, I estimate that at least one half of the long run effect of pre-1950 dams is due to spillovers. The estimated short and long run effects are highly robust to alternative procedures for selecting synthetic controls, to controls for confounding factors such as proximity to transportation networks, and to alternative sample restrictions, such as dropping dams built by the Tennessee Valley Authority or removing control counties with environmental regulations. I also find small local agglomeration effects from smaller dam projects, and small spillovers to nearby locations from large dams. Lastly, I find relatively small costs of environmental regulations associated with hydroelectric licensing rules. In Chapter 2, I study the joint choice of spouse and location made by individuals at the start of their adult lives. I assume that potential spouses meet in a marriage market and decide who to marry and where they will live, taking account of varying economic opportunities in different locations and inherent preferences for living near the families of both spouses. I develop a theoretical framework that incorporates a collective model of household allocation, conditional on the choice of spouse and location, with a forward-looking model of the marriage market that allows for the potential inability of spouses to commit to a particular intra-household sharing rule. I address the issue of unobserved heterogeneity in the tastes of husbands and wives using a control-function approach that assumes there is a one-to-one mapping between unobserved preferences of the two spouses and their labor supply choices. Estimation results for young dual-career households in the 2000 Census lead to three main findings. First, I find excess sensitivity of the sharing rule that governs the allocation of resources among couples to the conditions in the location they actually choose, implying that spouses cannot fully commit to a sharing rule. Second, I show that the lack of commitment has a relatively larger effect on the share of family resources received by women. Third, I find that the failure of full commitment can explain nearly all of the gap in the interstate migration rates of single and married people in the U.S. Finally, in Chapter 3, I examine unintended consequences of environmental regulations affecting the location of power plants. I present evidence that while hydroelectric licensing rules do conserve the wilderness and the wildlife by restricting the development of hydro projects in some counties, they lead to more greenhouse gas emissions in those same locations. Such environmental regulations aimed to preserve natural ecosystems do not seem to really protect nature. Basically, land conservation regulations give rise to a replacement of hydropower, which is a renewable, non-emitting source of energy, with conventional fossil-fuel power, which is highly pollutant. Restrictions imposed by hydroelectric licensing rules might be used as leverage by electric utilities to get permits to expand thermal power generation. Each megawatt of hydropower potential that is not developed because of those regulations induces the production of the average emissions of carbon dioxide per megawatt of U.S. coal-fired power plants. Environmental regulations focusing only on the preservation of ecosystems appears to stimulate dirty substitutions within electric utilities regarding electricity generation.
PROTOTYPE EICHER FISH SCREEN AND EVALUATION FACILITY, INSTALLED IN 1990 ...
PROTOTYPE EICHER FISH SCREEN AND EVALUATION FACILITY, INSTALLED IN 1990 ON #1 PENSTOCK. PROJECT SPONSORED BY THE ELECTRICAL POWER RESEARCH INSTITUTE TO TRANSFER FISH DOWNSTREAM PAST THE TURBINES. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-07
...: The proposed Three Sisters Irrigation District Hydroelectric Project would be located on the north pipe of the Three Sisters Irrigation District's Main Canal Pipeline in Deschutes County, Oregon. The... of Project: The Three Sisters Irrigation District Hydroelectric Project would consist of: (1) An...
18 CFR 292.203 - General requirements for qualification.
Code of Federal Regulations, 2012 CFR
2012-04-01
..., pursuant to § 292.207(b)(1), that has been granted. (c) Hydroelectric small power production facilities located at a new dam or diversion. (1) A hydroelectric small power production facility that impounds or... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false General requirements...
18 CFR 292.203 - General requirements for qualification.
Code of Federal Regulations, 2011 CFR
2011-04-01
..., pursuant to § 292.207(b)(1), that has been granted. (c) Hydroelectric small power production facilities located at a new dam or diversion. (1) A hydroelectric small power production facility that impounds or... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false General requirements...
18 CFR 292.203 - General requirements for qualification.
Code of Federal Regulations, 2014 CFR
2014-04-01
..., pursuant to § 292.207(b)(1), that has been granted. (c) Hydroelectric small power production facilities located at a new dam or diversion. (1) A hydroelectric small power production facility that impounds or... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false General requirements...
18 CFR 292.203 - General requirements for qualification.
Code of Federal Regulations, 2013 CFR
2013-04-01
..., pursuant to § 292.207(b)(1), that has been granted. (c) Hydroelectric small power production facilities located at a new dam or diversion. (1) A hydroelectric small power production facility that impounds or... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false General requirements...
18 CFR 4.108 - Contents of application for exemption from provisions other than licensing.
Code of Federal Regulations, 2012 CFR
2012-04-01
... POWER ACT LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.108 Contents of application for exemption from provisions other than licensing. An application for exemption of a small hydroelectric power project from...
18 CFR 4.102 - Surrender of exemption.
Code of Federal Regulations, 2014 CFR
2014-04-01
... OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.102... hydroelectric power project must file a petition with the Commission. (b)(1) If construction has begun, prior to...) information appropriate to the disposition and restoration of the project works and lands. The petition must...
18 CFR 4.108 - Contents of application for exemption from provisions other than licensing.
Code of Federal Regulations, 2013 CFR
2013-04-01
... POWER ACT LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.108 Contents of application for exemption from provisions other than licensing. An application for exemption of a small hydroelectric power project from...
18 CFR 4.102 - Surrender of exemption.
Code of Federal Regulations, 2012 CFR
2012-04-01
... OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.102... hydroelectric power project must file a petition with the Commission. (b)(1) If construction has begun, prior to...) information appropriate to the disposition and restoration of the project works and lands. The petition must...
18 CFR 4.108 - Contents of application for exemption from provisions other than licensing.
Code of Federal Regulations, 2011 CFR
2011-04-01
... POWER ACT LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.108 Contents of application for exemption from provisions other than licensing. An application for exemption of a small hydroelectric power project from...
18 CFR 4.102 - Surrender of exemption.
Code of Federal Regulations, 2011 CFR
2011-04-01
... OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.102... hydroelectric power project must file a petition with the Commission. (b)(1) If construction has begun, prior to...) information appropriate to the disposition and restoration of the project works and lands. The petition must...
18 CFR 4.108 - Contents of application for exemption from provisions other than licensing.
Code of Federal Regulations, 2010 CFR
2010-04-01
... POWER ACT LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.108 Contents of application for exemption from provisions other than licensing. An application for exemption of a small hydroelectric power project from...
18 CFR 4.102 - Surrender of exemption.
Code of Federal Regulations, 2013 CFR
2013-04-01
... OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.102... hydroelectric power project must file a petition with the Commission. (b)(1) If construction has begun, prior to...) information appropriate to the disposition and restoration of the project works and lands. The petition must...
18 CFR 4.108 - Contents of application for exemption from provisions other than licensing.
Code of Federal Regulations, 2014 CFR
2014-04-01
... POWER ACT LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.108 Contents of application for exemption from provisions other than licensing. An application for exemption of a small hydroelectric power project from...
77 FR 50681 - Pacific Gas and Electric Company; Notice of Receipt of Application
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-22
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2130-066] Pacific Gas and Electric Company; Notice of Receipt of Application Take notice that the following hydroelectric application.... Applicant: Pacific Gas and Electric Company (PG&E). e. Name of Project: Spring Gap--Stanislaus Hydroelectric...
VIEW OF HISTORIC SLATE SWITCHBOARD IN THE CONTROL ROOM OF ...
VIEW OF HISTORIC SLATE SWITCHBOARD IN THE CONTROL ROOM OF THE ELWHA POWERHOUSE, INCLUDING: METERS, PROTECTIVE RELAYS, AND SWITCHES. NOTE ADDITION OF PERSONAL COMPUTERS FOR POWER METERING AND OPERATIONS. PHOTO BY JET LOWE, HAER, 1995. - Elwha River Hydroelectric System, Elwha Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA
52. POWER HOUSE AREA, SANTA ANA NO. 2; DETAIL MAP ...
52. POWER HOUSE AREA, SANTA ANA NO. 2; DETAIL MAP OF SANTA ANA NO. 1 AND NO. 2 HYDROELECTRIC PROJECT, EXHIBIT K, APR. 30, 1945. SCE drawing no. 523691 (sheet no. 6; for filing with the Federal Power Commission). - Santa Ana River Hydroelectric System, Redlands, San Bernardino County, CA
Village scale micro-hydroelectric systems in countries like Bhutan, Thailand, Peru, Laos and China provide renewable electricity to thousands of self-reliant communities in remote locations. While promising, many of these systems are plagued by a common problem: brownouts occu...
1994-09-30
Oregon, 349 U.S. 435, 75 S.Ct. 832, 99 L.Ed. 1215 (1955)(The Pelton Dam case). 143Id" - 38 - The case that offered the greatest modem support for...Wildlife Federation brought suit against a hydroelectric plant to stop discharge of dead fish remains in turbine generated water. The Sixth Circuit held...behind the dam, spill water over the top during high water or to allow for maintenance on the turbine facility." Congress uses the word "discharge
NASA Astrophysics Data System (ADS)
Platonov, D. V.; Maslennikova, A. V.; Dekterev, D. A.; Minakov, A. V.; Abramov, A. V.
2018-01-01
In the present study, we report on the results of an experimental study of pressure pulsations in the flow duct of a medium-scale hydrodynamic bench with Francis turbine. In various regimes, integral and pulsation characteristics of the turbine were measured. With the help of high-speed filming, the structure of the flow behind the turbine runner was analyzed, and the influence of this structure on the intensity and frequency of pressure pulsations in the flow duct was demonstrated.
The First Israeli Hydro-Electric Pumped Storage Power Plant Gilboa PSPP
NASA Astrophysics Data System (ADS)
Maruzewski, P., Dr.; Sautereau, T.; Sapir, Y.; Barak, H.; Hénard, F.; Blaix, J.-C.
2016-11-01
The Israeli Public Utilities Authority, PUA, decided to increase the instantaneous power available on the grid by adding Pumped Storage Power Plants, PSPP, to the existing generation capacity. PSP Investments Ltd. is a private investor that decided to develop the Gilboa PSPP. Its capacity is 300MWe. The project performance has to comply with PUA regulation for PSPP, and with all relevant Israeli laws and IECo standards. This paper itemizes an overview of the Gilboa PSPP through short summaries of units’ components from design step to manufacturing processes.
2016-03-30
lesson 8.4, " Wind Turbine Design Inquiry." 13 The goal of her project was to combine a1t and science in project-based learning. Although pmt of an...challenged to design, test, and redesign wind turbine blades, defining variables and measuring performance. Their goal was to optimize perfonnance through...hydroelectric. In each model there are more than one variable. For example, the wind farm activity enables the user to select number of turbines
New control center for EPM in Medellin, Columbia
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gomez, H.C.; Zadeh, K.N.; Meyer, R.C.
1989-07-01
The municipal electric utility of Empresas Publicas de Medellin (EPM) in Medellin, Colombia, has completed the installation and testing of their new control center. These facilities, which include all the functions expected from a modern control center, were implemented through carefully monitored and executed project stages, which are described in this article. EPM generates and transmits 1400 MW of exclusively hydroelectric energy to their service territory of the city of Medellin and nine neighboring cities and 77 smaller cities. The EPM system load ranges from 400 MW to 1200 MW.
Precipitation Estimates for Hydroelectricity
NASA Technical Reports Server (NTRS)
Tapiador, Francisco J.; Hou, Arthur Y.; de Castro, Manuel; Checa, Ramiro; Cuartero, Fernando; Barros, Ana P.
2011-01-01
Hydroelectric plants require precise and timely estimates of rain, snow and other hydrometeors for operations. However, it is far from being a trivial task to measure and predict precipitation. This paper presents the linkages between precipitation science and hydroelectricity, and in doing so it provides insight into current research directions that are relevant for this renewable energy. Methods described include radars, disdrometers, satellites and numerical models. Two recent advances that have the potential of being highly beneficial for hydropower operations are featured: the Global Precipitation Measuring (GPM) mission, which represents an important leap forward in precipitation observations from space, and high performance computing (HPC) and grid technology, that allows building ensembles of numerical weather and climate models.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gillin, Charmel; Lipscomb, Brian
This project aimed at supporting one key component of a major multi-step undertaking on the part of the CSKT: the acquisition of the Kerr Hydroelectric project and its subsequent operation as a wholesale power generation facility. This project provided support to kick-start the development of the organizational structure to acquire and operate the facility by acquiring critical expertise necessary for the acquisition by funding in part two key personnel for the first two years of the four-year organizational development process. These individuals provided the Tribes with expert knowledge in the highly specialized areas of resource balancing, power marketing, and hydro-engineering;more » essential prerequisites to the Tribes' ability to build an organization for the operation of the Kerr Project and to securing financial backing for the acquisition. Goals achieved: • Establishing an efficient and economic conveyance process, and transition plans • Establishing an efficient and effective Tribal wholesale power generation corporation to manage the plant, balance the resources, and market the power from the Kerr Project. The success of this project, which is essential to the Tribes' acquisition of the Kerr Hydroelectric facility, helps to address poverty and unemployment among Tribal members by generating a number of highly skilled and specialized, high-paying Tribal member jobs and providing a stream of income from power sales that will be used for Tribal economic development. Objectives achieved: The project supported the position of Power Plant Operations and Maintenance engineer and power marketing coordinator positions. These are key, in part, to the Tribes' successful acquisition and operation of the facility because they will enable to the Tribes to gain the very specialized expertise required to operate a large wholesale power generation facility. Specific objectives include: Objective 1: Hire a power marketing coordinator to develop and coordinate the appropriate power marketing strategy for the sale of power generated by the operation of Kerr Dam. Objective 2: Hire a staff engineer.« less
76 FR 1148 - CRD Hydroelectric LLC, Iowa; Notice of Availability of Environmental Assessment
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-07
... reviewed the application for an original license for the Red Rock Hydroelectric Project (FERC Project No... Engineers' Red Rock Dam. Staff prepared an environmental assessment (EA), which analyzes the potential... the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov using...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-24
... Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a... Bureau of Land Management to improve agency coordination and discuss the agencies' overlapping jurisdictions (pursuant to the Federal Land Policy and Management Act and the Federal Power Act), on the Eagle...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-26
... Commission staff is consulting with the Louisiana State Historic Preservation Officer (Louisiana SHPO) and the Advisory Council on Historic Preservation (Advisory Council) pursuant to the Advisory Council's regulations, 36 CFR part 800, implementing section 106 of the National Historic Preservation Act, as amended...
76 FR 12101 - Jordan Hydroelectric Limited Partnership; Notice of Environmental Assessment
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-04
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 12737-002] Jordan Hydroelectric Limited Partnership; Notice of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's regulations, 18 CFR part 380 (Order No. 486, 52 FR 447897), the Office of...
River recreation management opportunities in hydroelectric relicensing
James R. Bernier
1992-01-01
Between now and 1993, more than 200 existing hydroelectric projects will come up for relicensing before FERC, the Federal Energy Regulatory Commission. This provides a rare opportunity for agencies and individuals to markedly influence the ecological and recreational balance of these projects. This paper presents an overview of the relicensing process, describes some...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-13
... (Oncorhynchus kisutch) as a result of operation and maintenance of its Klamath Hydroelectric Project (Project... term ``take'' as: ``harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect, or to... the East Side and West Side canals, penstocks, turbines, and powerhouse facilities, (3) Operate and...
18 CFR 4.106 - Standard terms and conditions of case-specific exemption from licensing.
Code of Federal Regulations, 2013 CFR
2013-04-01
... LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.106 Standard terms and conditions of case-specific exemption from licensing. Any case-specific exemption from licensing granted for a small hydroelectric power project is...
18 CFR 4.103 - General provisions for case-specific exemption.
Code of Federal Regulations, 2010 CFR
2010-04-01
..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.103 General provisions for case-specific exemption. (a) Exemptible projects. Subject to... exempt on a case-specific basis any small hydroelectric power project from all or part of Part I of the...
18 CFR 4.103 - General provisions for case-specific exemption.
Code of Federal Regulations, 2012 CFR
2012-04-01
..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.103 General provisions for case-specific exemption. (a) Exemptible projects. Subject to... exempt on a case-specific basis any small hydroelectric power project from all or part of Part I of the...
18 CFR 4.106 - Standard terms and conditions of case-specific exemption from licensing.
Code of Federal Regulations, 2012 CFR
2012-04-01
... LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.106 Standard terms and conditions of case-specific exemption from licensing. Any case-specific exemption from licensing granted for a small hydroelectric power project is...
18 CFR 4.103 - General provisions for case-specific exemption.
Code of Federal Regulations, 2011 CFR
2011-04-01
..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.103 General provisions for case-specific exemption. (a) Exemptible projects. Subject to... exempt on a case-specific basis any small hydroelectric power project from all or part of Part I of the...
18 CFR 4.103 - General provisions for case-specific exemption.
Code of Federal Regulations, 2014 CFR
2014-04-01
..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.103 General provisions for case-specific exemption. (a) Exemptible projects. Subject to... exempt on a case-specific basis any small hydroelectric power project from all or part of Part I of the...
18 CFR 4.103 - General provisions for case-specific exemption.
Code of Federal Regulations, 2013 CFR
2013-04-01
..., EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.103 General provisions for case-specific exemption. (a) Exemptible projects. Subject to... exempt on a case-specific basis any small hydroelectric power project from all or part of Part I of the...
18 CFR 4.106 - Standard terms and conditions of case-specific exemption from licensing.
Code of Federal Regulations, 2014 CFR
2014-04-01
... LICENSES, PERMITS, EXEMPTIONS, AND DETERMINATION OF PROJECT COSTS Exemption of Small Hydroelectric Power Projects of 5 Megawatts or Less § 4.106 Standard terms and conditions of case-specific exemption from licensing. Any case-specific exemption from licensing granted for a small hydroelectric power project is...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-27
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No.: 12478-003] Gibson Dam... Commission and is available for public inspection. a. Type of Application: Major Project--Existing Dam. b. Project No.: P-12478-003. c. Date filed: August 28, 2009. d. Applicant: Gibson Dam Hydroelectric Company...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-20
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12478-003] Gibson Dam... reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S. Department of the Interior, Bureau of Reclamation's Gibson dam on the Sun River in Lewis and Clark and Teton...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-23
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14261-000, 14268-000, 14277-000, 14281-000] Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC...-Tombigbee Waterway in Lowndes County, Mississippi. The applications were filed by Lock+ Hydro Friends Fund...
76 FR 28024 - Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-13
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 503-048-ID] Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference a. Date and Time of Meeting: Tuesday, May 24, 2011 at 10 a.m. (Mountain Time). b. Place: By copy of this notice we are inviting all interested...
51. INTAKE AND POWER HOUSE AREAS, SANTA ANA NO. 1; ...
51. INTAKE AND POWER HOUSE AREAS, SANTA ANA NO. 1; DETAIL MAP OF SANTA ANA NO. 1 AND NO. 2 HYDROELECTRIC PROJECT, EXHIBIT K, APR. 30, 1945. SCE drawing no. 523690 (sheet no. 5; for filing with the Federal Power Commission). - Santa Ana River Hydroelectric System, Redlands, San Bernardino County, CA
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-25
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2206-030] Duke Energy Progress, Inc.; Notice of Video Conference To Discuss Yadkin-Pee Dee Hydroelectric Project Biological...), NMFS will host a video conference to describe and discuss the terms and conditions in the Biological...
VIEW OF PELTON WATER WHEEL COMPANY (SAN FRANCISCO) TURBINE: SPEED ...
VIEW OF PELTON WATER WHEEL COMPANY (SAN FRANCISCO) TURBINE: SPEED 225 RPM, 17,500 HP. PHOTO BY JET LOWE, HAER, 1995. (Note: the dark hole in the concrete column to the left is from a tear in the negative.) - Elwha River Hydroelectric System, Glines Hydroelectric Dam & Plant, Port Angeles, Clallam County, WA
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-09
... the Draft Environmental Impact Statement for the Toledo Bend Hydroelectric Project On May 17, 2013, the Commission issued a Draft Environmental Impact Statement (draft EIS) for the Toledo Bend Hydroelectric Project No 2105-036 (Toledo Bend Project). The draft EIS documents the views of governmental...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-20
... Environmental Impact Statement for the Toledo Bend Hydroelectric Project In accordance with the National... Office of Energy Projects has reviewed the application for license for the Toledo Bend Hydroelectric... the Toledo Bend Project. The draft EIS documents the views of governmental agencies, non- governmental...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-03
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Time Extension To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power Development at the Pueblo Dam River Outlet, a Feature of the... period for accepting written proposals detailed in the Notice of Intent to Accept Proposals, Select One...
Increased dependence of humans on ecosystem services and biodiversity.
Guo, Zhongwei; Zhang, Lin; Li, Yiming
2010-10-01
Humans have altered ecosystems more rapidly and extensively than ever, largely to meet rapidly growing demands for resources along with economic development. These demands have been considered important drivers of ecosystem degradation and biodiversity loss. Are humans becoming less dependent on ecosystem services and biodiversity following economic development? Here, we used roundwood production, hydroelectricity generation and tourism investment in 92 biodiversity hotspot and 60 non-hotspot countries as cases to seek the answer. In 1980-2005, annual growth rates of roundwood production, hydroelectricity generation and tourism investment were higher in hotspot countries (5.2, 9.1 and 7.5%) than in non-hotspot countries (3.4, 5.9 and 5.6%), when GDP grew more rapidly in hotspot countries than non-hotspot countries. Annual growth rates of per capita hydropower and per capita tourism investment were higher in hotspot countries (5.3% and 6.1%) than in non-hotspot countries (3.5% and 4.3%); however, the annual growth rate of per capita roundwood production in hotspot countries (1%) was lower than in non-hotspot countries (1.4%). The dependence of humans on cultural services has increased more rapidly than on regulating services, while the dependence on provisioning services has reduced. This pattern is projected to continue during 2005-2020. Our preliminary results show that economic growth has actually made humans more dependent upon ecosystem services and biodiversity. As a consequence, the policies and implementations of both economic development and ecosystems/biodiversity conservation should be formulated and carried out in the context of the increased dependence of humans on ecosystem services along with economic development.
NASA Astrophysics Data System (ADS)
Ferencz, S. B.; Cardenas, M. B.; Neilson, B. T.; Watson, J.
2017-12-01
A majority of the world's largest river systems are regulated by dams. In addition to being used for water resources management and flood prevention, many large dams are also used for hydroelectric power generation. In the United States, dams account for 7% of domestic electricity, and hydropower accounts for 16% of worldwide electricity production. To help meet electricity demand during peak usage times, hydropower utilities often increase their releases of water during high demand periods. This practice, termed hydropeaking, can cause large transient flow regimes downstream of hydroelectric dams. These transient flow increases can result in order of magnitude daily fluctuations in discharge, and the released water can have different thermal and chemical properties than ambient river water. As hydropeaking releases travel downstream, the temporary rise in stage and increase in discharge can enhance surface water-groundwater (SW-GW) exchange between the river and its alluvial aquifer. This dam-induced SW-GW exchange, combined with hydrodynamic attenuation and heat exchange processes, result in complex responses downstream. The dam-regulated Lower Colorado River downstream of Austin, TX was used as a natural laboratory to observe SW-GW interactions and downstream transport of water, heat, and solutes under hydropeaking conditions. To characterize SW-GW interactions, well transects were installed in the banks of the river to observe exchanges between the river and alluvial aquifer. The well transects were installed at three different distances from the dam (15km, 35km, and 80km). At each well transect conductivity, temperature, and pressure sensors were deployed in the monitoring wells and in the channel. Additional conductivity and temperature sensors were deployed along the study reach to provide a more detailed record of heat and solute transport during hydropeaking releases. The field data spans over two months of daily dam releases that were punctuated by two large natural storm events. To our knowledge, this study is the first to use multiple downstream field sites to characterize how dam-induced SW-GW interactions and in-stream temperature and solute transport behave under hydropeaking conditions.
Three essays on the causes and consequences of government spending and regulatory programs
NASA Astrophysics Data System (ADS)
Bee, C. Adam
Chapter 1 assesses the impact of household car ownership on individual labor supply. Various economic theories suggest one reason for low rates of employment among low-skill, inner-city residents is that their residences are spatially separated from suburban jobs. To measure this, I exploit changes in state insurance rate regulation which has been shown to suppress auto insurance prices, thereby decreasing the cost of owning a car. I find that rate regulation increases multi-car ownership among married couples with children. I find that the additional car in the household consequently encourages married mothers to decrease their labor supply while their husbands increase their labor supply. One possible explanation of this result is that second cars are stronger complements to time spent in home production (and especially childrearing) than they are to time spent in the labor market. Chapter 2 (with Shawn Moulton) tests for political budget cycles among US municipalities. According to the political budget cycle hypothesis, in election years government officials engage in opportunistic fiscal policy manipulation for electoral gains. This chapter tests that hypothesis using data on taxes and spending for a panel of 268 US cities over the period 1970-2004. While our estimates provide no evidence of altered total expenditures or taxes in election years, we do find a 0.7 percent increase in total municipal employment, including increases in police, education, and sanitation employment. Chapter 3 (with Andrew Deines, David Lodge, and Richard Jensen) assesses trade-offs between fisheries and hydropower production in a tropical floodplain fishery. We compile catch per unit effort, total harvest, and monthly-mean hydrographs from the Kafue River in Zambia for the years 1955-1996 and develop population growth models to test for effects of density, total fisheries harvest, and water regime. We find that alteration of the flood regime has reduced fish density but enhanced hydroelectric production. The total cost of replacing this hydroelectricity is less than a third of the additional surplus generated by a natural flood regime's impact on fisheries production, implying changes in dam operation to provide environmental flows can be a cost-effective means of improving the material well-being of subsistence fishermen.
NASA Astrophysics Data System (ADS)
Roy, S. G.; Gold, A.; Uchida, E.; McGreavy, B.; Smith, S. M.; Wilson, K.; Blachly, B.; Newcomb, A.; Hart, D.; Gardner, K.
2017-12-01
Dam removal has become a cornerstone of environmental restoration practice in the United States. One outcome of dam removal that has received positive attention is restored access to historic habitat for sea-run fisheries, providing a crucial gain in ecosystem resilience. But dams also provide stakeholders with valuable services, and uncertain socio-ecological outcomes can arise if there is not careful consideration of the basin scale trade offs caused by dam removal. In addition to fisheries, dam removals can significantly affect landscape nutrient flux, municipal water storage, recreational use of lakes and rivers, property values, hydroelectricity generation, the cultural meaning of dams, and many other river-based ecosystem services. We use a production possibility frontiers approach to explore dam decision scenarios and opportunities for trading between ecosystem services that are positively or negatively affected by dam removal in New England. Scenarios that provide efficient trade off potentials are identified using a multiobjective genetic algorithm. Our results suggest that for many river systems, there is a significant potential to increase the value of fisheries and other ecosystem services with minimal dam removals, and further increases are possible by including decisions related to dam operations and physical modifications. Run-of-river dams located near the head of tide are often found to be optimal for removal due to low hydroelectric capacity and high impact on fisheries. Conversely, dams with large impoundments near a river's headwaters can be less optimal for dam removal because their value as nitrogen sinks often outweighs the potential value for fisheries. Hydropower capacity is negatively impacted by dam removal but there are opportunities to meet or exceed lost capacity by upgrading preserved hydropower dams. Improving fish passage facilities for dams that are critical for safety or water storage can also reduce impacts on fisheries. Our method is helpful for identifying efficient decision scenarios, but finding the optimal decision requires a deep and mutual understanding of stakeholder preferences. We outline how to interpret these preferences, identify overlaps with the efficient decision scenarios, and estimate the monetary budget required to act on these decisions.
Code of Federal Regulations, 2010 CFR
2010-04-01
... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... 201 AND 210 OF THE PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 WITH REGARD TO SMALL POWER PRODUCTION AND COGENERATION Qualifying Cogeneration and Small Power Production Facilities § 292.208 Special...
Code of Federal Regulations, 2011 CFR
2011-04-01
... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... 201 AND 210 OF THE PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 WITH REGARD TO SMALL POWER PRODUCTION AND COGENERATION Qualifying Cogeneration and Small Power Production Facilities § 292.208 Special...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-22
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Teleconference a. Date and Time of Meeting... staff of the U.S. Fish and Wildlife Service and Eagle Crest Energy as part of its on-going Section 7...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-22
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002--CA] Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Teleconference a. Date and Time of Meeting... staff of the U.S. Fish and Wildlife Service and Eagle Crest Energy as part of its on-going Section 7...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-26
.... Date filed: June 10, 2013. d. Applicant: Gresham Municipal Utilities. e. Name of Project: Upper Red Lake Dam Hydroelectric Project. f. Location: On Red River in Shawano County, Wisconsin. No federal... analysis at this time. n. The Upper Red Lake Dam Hydroelectric Project would consist of the following...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-04
... Utilities. e. Name of Project: Upper Red Lake Dam Hydroelectric Project. f. Location: On the Red River, in.... Description of Request: The licensee proposes to amend the license for the Upper Red Lake Dam Hydroelectric... Project No. 2464), which is located immediately downstream from the Upper Red Lake Dam Project; (2) the...
78 FR 41056 - Notice of Availability of Environmental Assessment
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-09
... applications for original licenses for the Red River Lock and Dam No. 5 Hydroelectric Project (FERC Project No. 12758-004), Red River Lock and Dam No. 4 Hydroelectric Project (FERC Project No. 12757- 004), and Red... be located on the Red River in Louisiana. The Lock and Dam No. 5 Project would be located in Bossier...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-30
... Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a.... Purpose of the Meeting: Commission staff will meet with the staff of the Bureau of Land Management to... Land Policy and Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage...
75 FR 35020 - Wilkesboro Hydroelectric Company, LLC; Notice Soliciting Scoping Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-21
.... Applicant: Wilkesboro Hydroelectric Company, LLC. e. Name of Project: W. Kerr Scott Hydropower Project. f. Location: The proposed project would be located at the existing U.S. Army Corps of Engineers' (Corps) W..., FL 33527, (813) 659-3014; and Mr. Kevin Edwards, P.O. Box 143, Mayodan, NC 27027, (336) 589-6138 i...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-08
... District No. 1 of Douglas County; Notice of Authorization for Continued Project Operation On May 27, 2010, the Public Utility District No. 1 of Douglas County, licensee for the Wells Hydroelectric Project... regulations thereunder. The Wells Hydroelectric Project is located on the Columbia River in Douglas, Okanogan...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-16
.... 13826-000] FFP Missouri 17, LLC; BOST2 Hydroelectric, LLC; Notice Announcing Preliminary Permit Drawing... of the Commission, or her designee, will conduct a random drawing to determine the filing priority of... applications as provided in section 4.37 of its regulations.\\2\\ The priority established by this drawing will...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-31
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14163-000; 14174-000; 14181-000; 14195-000] Solia 7 Hydroelectric LLC; Riverbank Hydro No. 20 LLC; Lock Hydro Friends Fund... LLC (Solia), and Riverbank Hydro No. 20 LLC (Riverbank), and on May 3, 2011, Lock Hydro Friends Fund...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-06
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14261-000, 14268-000, 14277-000, 14281-000] Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC.... Lock+ Hydro Friends Fund XVIII: Project No. 14261-000. 2. Riverbank Hydro No. 25, LLC: Project No...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-31
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14157-000; 14161-000; 14184-000] Solia 2 Hydroelectric LLC; Riverbank Hydro No. 7 LLC; Lock Hydro Friends Fund XXXVIII Notice.... 7 LLC (Riverbank) and on May 3, 2011, Lock Hydro Friends Fund XXXVIII (Lock Hydro) filed preliminary...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-07
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13745-000; Project No. 13758-000; Project No. 13767-000] Lock Hydro Friends Fund XLIII; FFP Missouri 14, LLC; Solia 4... Hydroelectric, LLC--Project No. 13767-000 2. FFP Missouri 14, LLC--Project No. 13758-000 3. Lock Hydro Friends...
76 FR 51027 - F&B Wood Corporation; Milltown Hydroelectric LLC.; Notice of Transfer of Exemption
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-17
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12629-003] F&B Wood... the Commission's regulations,\\1\\ F&B Wood Corporation, exemptee for the Corriveau Hydroelectric... Project No. 12629 on October 24, 2006. F&B Wood Corp.,117 FERC ] 62,059 (2006) \\3\\ See filings of May 9...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1985-01-01
The report on House Joint Resolution 382, as amended, would allow a 10-year license for a hydroelectric plant currently operating within Sequoia National Park, but prohibit any expansion of the project. The first hydroelectric facility on the Kaweah River dates from the 1890s, shortly after the park was established to preserve California's sequoia trees. The legislation would require no additional federal funding and have no inflationary impact. Correspondence from the Department of Interior to the committee outlines the Department's philosophy and findings regarding the facility and suggests amendments along the lines of those proposed by the committee.
Estimated use of water in the United States in 1970
Murray, Charles Richard; Reeves, E. Bodette
1972-01-01
The average annual streamflow--simplified measure of the total available water supply--is approximately 1,200 bgd in the conterminous United States. Total water withdrawn in 1970 for off-channel uses (withdrawals other than for hydroelectric power) amounted to about 30 percent of the average annual streamflow: 7 percent of the 1,200 bgd basic supply was consumed. However, comparisons of Water Resources Council regions indicate that the rate of withdrawal was higher than the locally dependable supply in the Middle Atlantic, Texas-Gulf, Rio Grande, Lower Colorado, and California-South Pacific regions. Consumption amounted to nearly 25 percent of withdrawals in the conterminous United States; however, fresh-water consumption amounted to only 14 percent of off-channel withdrawals in the 31 Eastern States and ranged from 30 percent to nearly 70 percent of off-channel withdrawals in the Water Resources Council regions in the West. In the Rio Grande and Lower Colorado regions, fresh-water consumption in 1970 exceeded the estimated dependable supply of fresh water.
Conforth Ranch Wildlife Mitigation Feasibility Study, McNary, Oregon : Annual Report.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rasmussen, Larry; Wright, Patrick; Giger, Richard
1991-03-01
The 2,860-acre Conforth Ranch near Umatilla, Oregon is being considered for acquisition and management to partially mitigate wildlife losses associated with McNary Hydroelectric Project. The Habitat Evaluation Procedures (HEP) estimated that management for wildlife would result in habitat unit gains of 519 for meadowlark, 420 for quail, 431 for mallard, 466 for Canada goose, 405 for mink, 49 for downy woodpecker, 172 for yellow warbler, and 34 for spotted sandpiper. This amounts to a total combined gain of 2,495 habitat units -- a 110 percent increase over the existing values for these species combined of 2,274 habitat units. Current watermore » delivery costs, estimated at $50,000 per year, are expected to increase to $125,000 per year. A survey of local interest indicated a majority of respondents favored the concept with a minority opposed. No contaminants that would preclude the Fish and Wildlife Service from agreeing to accept the property were identified. 21 refs., 3 figs., 5 tabs.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-18
... Hydroelectric, LLC (BOST3). e. Name of Project: Red River Lock & Dam No. 3 Hydroelectric Project. f. Location: The proposed project would be located at the existing U.S. Army Corps of Engineer's (Corps) Red River Lock & Dam No. 3 on the Red River, in Natchitoches Parish near the City of Colfax, Louisiana. The...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-06
... (BOST5). e. Name of Project: Red River Lock & Dam No. 5 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer's (Corps) Red River Lock & Dam No. 5 on the Red River, in Bassier Parish near the Town of Ninock, Louisiana. g. Filed Pursuant to: Federal...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-02
.... Name of Project: Red Rock Hydroelectric Project. f. Location: The project is located at the U.S. Army Corps of Engineers Lake Red Rock Dam on the Des Moines River in Marion County, Iowa. g. Filed Pursuant.... Army Corps of Engineers' Lake Red Rock Dam. The applicant's proposal also includes the installation of...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-17
... (BOST4). e. Name of Project: Red River Lock & Dam No. 4 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer's (Corps) Red River Lock & Dam No. 4 on the Red River, in Red River Parish near the City of Coushatta, Louisiana. g. Filed Pursuant to...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-06
... (BOST4). e. Name of Project: Red River Lock & Dam No. 4 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer's (Corps) Red River Lock & Dam No. 4 on the Red River, in Red River Parish near the Town of Coushatta, Louisiana. g. Filed Pursuant to...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-17
...). e. Name of Project: Red River Lock & Dam No. 3 Hydroelectric Project. f. Location: The proposed project would be located at the existing Army Corps of Engineer's (Corps) Red River Lock & Dam No. 3 on the Red River, in Natchitoches Parish near the City of Colfax, Louisiana. g. Filed Pursuant to...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-15
.... Applicant: Wilkesboro Hydroelectric Company. e. Name of Project: W. Kerr Scott Hydropower Project. f. Location: The proposed project would be located at the existing U.S. Army Corps of Engineers' (Corps) W... Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r). h. Applicant Contact: Mr. Kevin Edwards, P.O. Box...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-04
... incidental take of one ESA-listed species as a result of operation and maintenance of the Klamath..., pursue, hunt, shoot, wound, kill, trap, capture, or collect, or to attempt to engage in any such conduct... maintenance of the Klamath Hydroelectric Project (Project) and implementation of the Plan for a 10-year period...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-31
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14162-000; 14173-000; 14182-000; 14192-000] Solia 9 Hydroelectric LLC Riverbank Hydro No. 17 LLC Lock Hydro Friends Fund XLI... LLC (Solia), and Riverbank Hydro No. 17 LLC (Riverbank), and on May 3, 2011, Lock Hydro Friends Fund...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE WORK FOR OTHERS Investigation and supervision of hydropower projects under the Federal Power...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE WORK FOR OTHERS Investigation and supervision of hydropower projects under the Federal Power...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE WORK FOR OTHERS Investigation and supervision of hydropower projects under the Federal Power...
Filling temporary underground structures and workings at high-head hydro developments
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ilyushin, V.F.
1994-12-01
Examples of backfilling temporary underground structures and workings at hydroelectric stations in Russia are cited. Structures backfilled include temporary tunnels and auxiliary workings (shafts, chambers, etc.). Detail drawings illustrate many of the examples. Examples of backfilling at a number of hydropower plants are given; however, the main emphasis is on construction of Nurek Hydroelectric Station. 8 refs., 11 figs.
Integrity inspection of main access tunnel using ground penetrating radar
NASA Astrophysics Data System (ADS)
Ismail, M. A.; Abas, A. A.; Arifin, M. H.; Ismail, M. N.; Othman, N. A.; Setu, A.; Ahmad, M. R.; Shah, M. K.; Amin, S.; Sarah, T.
2017-11-01
This paper discusses the Ground Penetrating Radar (GPR) survey performed to determine the integrity of wall of tunnel at a hydroelectric power generation facility. GPR utilises electromagnetic waves that are transmitted into the medium of survey. Any reflectors in the medium will reflect the transmitted waves and picked up by the GPR antenna. The survey was done using MALA GeoScience RAMAC CUII with 250MHz antenna. Survey was done on the left, the crown and the right walls of the underground tunnels. Distance was measured using wheel encoders. The results of the survey is discussed in this paper.