Sample records for iaea research contracts

  1. Strengthening IAEA Safeguards for Research Reactors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reid, Bruce D.; Anzelon, George A.; Budlong-Sylvester, Kory

    During their December 10-11, 2013, workshop in Grenoble France, which focused on the history and future of safeguarding research reactors, the United States, France and the United Kingdom (UK) agreed to conduct a joint study exploring ways to strengthen the IAEA’s safeguards approach for declared research reactors. This decision was prompted by concerns about: 1) historical cases of non-compliance involving misuse (including the use of non-nuclear materials for production of neutron generators for weapons) and diversion that were discovered, in many cases, long after the violations took place and as part of broader pattern of undeclared activities in half amore » dozen countries; 2) the fact that, under the Safeguards Criteria, the IAEA inspects some reactors (e.g., those with power levels under 25 MWt) less than once per year; 3) the long-standing precedent of States using heavy water research reactors (HWRR) to produce plutonium for weapons programs; 4) the use of HEU fuel in some research reactors; and 5) various technical characteristics common to some types of research reactors that could provide an opportunity for potential proliferators to misuse the facility or divert material with low probability of detection by the IAEA. In some research reactors it is difficult to detect diversion or undeclared irradiation. In addition, infrastructure associated with research reactors could pose a safeguards challenge. To strengthen the effectiveness of safeguards at the State level, this paper advocates that the IAEA consider ways to focus additional attention and broaden its safeguards toolbox for research reactors. This increase in focus on the research reactors could begin with the recognition that the research reactor (of any size) could be a common path element on a large number of technically plausible pathways that must be considered when performing acquisition pathway analysis (APA) for developing a State Level Approach (SLA) and Annual Implementation Plan

  2. Contribution to fusion research from IAEA coordinated research projects and joint experiments

    NASA Astrophysics Data System (ADS)

    Gryaznevich, M.; Van Oost, G.; Stöckel, J.; Kamendje, R.; Kuteev, B. N.; Melnikov, A.; Popov, T.; Svoboda, V.; The IAEA CRP Teams

    2015-10-01

    The paper presents objectives and activities of IAEA Coordinated Research Projects ‘Conceptual development of steady-state compact fusion neutron sources’ and ‘Utilisation of a network of small magnetic confinement fusion devices for mainstream fusion research’. The background and main projects of the CRP on FNS are described in detail, as this is a new activity at IAEA. Recent activities of the second CRP, which continues activities of previous CRPs, are overviewed.

  3. Coordinated Research Projects of the IAEA Atomic and Molecular Data Unit

    NASA Astrophysics Data System (ADS)

    Braams, B. J.; Chung, H.-K.

    2011-05-01

    The IAEA Atomic and Molecular Data Unit is dedicated to the provision of databases for atomic, molecular and plasma-material interaction (AM/PMI) data that are relevant for nuclear fusion research. IAEA Coordinated Research Projects (CRPs) are the principal mechanism by which the Unit encourages data evaluation and the production of new data. Ongoing and planned CRPs on AM/PMI data are briefly described here.

  4. Progress and status of the IAEA coordinated research project: production of Mo-99 using LEU fission or neutron activation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goldman, Ira N.; Adelfang, Pablo; Ramamoorthy, Natesan

    2008-07-15

    Since late 2004, the IAEA has developed and implemented a Coordinated Research Project (CRP) to assist countries interested in initiating indigenous, small-scale production of Mo-99 to meet local nuclear medicine requirements. The objective of the CRP is to provide interested countries with access to non-proprietary technologies and methods to produce Mo-99 using LEU foil or LEU mini-plate targets, or for the utilization of n,gamma neutron activation, e.g. through the use of gel generators. The project has made further progress since the RERTR 2006 meeting, with a Technical Workshop on Operational Aspects of Mo99 Production held 28-30 November 2006 in Viennamore » and the Second Research Coordination Meeting held in Bucharest, Romania 16-20 April 2007. The paper describes activities carried out as noted above, and as well as the provision of LEU foils to a number of participants, and the progress by a number of groups in preparing for LEU target assembly and disassembly, irradiation, chemical processing, and waste management. The participants' progress in particular on thermal hydraulics computations required for using LEU targets is notable, as also the progress in gel generator plant operations in India and Kazakhstan. Poland has joined as a new research agreement holder and an application by Egypt to be a contract holder is undergoing internal review in the IAEA and is expected to be approved. The IAEA has also participated in several open meetings of the U.S. National Academy of Sciences Study on Producing Medical Radioisotopes without HEU, which will also be discussed in the paper. (author)« less

  5. Process Improvement for Interinstitutional Research Contracting.

    PubMed

    Varner, Michael; Logan, Jennifer; Bjorklund, Todd; Whitfield, Jesse; Reed, Peggy; Lesher, Laurie; Sikalis, Amy; Brown, Brent; Drollinger, Sandy; Larrabee, Kristine; Thompson, Kristie; Clark, Erin; Workman, Michael; Boi, Luca

    2015-08-01

    Sponsored research increasingly requires multiinstitutional collaboration. However, research contracting procedures have become more complicated and time consuming. The perinatal research units of two colocated healthcare systems sought to improve their research contracting processes. The Lean Process, a management practice that iteratively involves team members in root cause analyses and process improvement, was applied to the research contracting process, initially using Process Mapping and then developing Problem Solving Reports. Root cause analyses revealed that the longest delays were the individual contract legal negotiations. In addition, the "business entity" was the research support personnel of both healthcare systems whose "customers" were investigators attempting to conduct interinstitutional research. Development of mutually acceptable research contract templates and language, chain of custody templates, and process development and refinement formats decreased the Notice of Grant Award to Purchase Order time from a mean of 103.5 days in the year prior to Lean Process implementation to 45.8 days in the year after implementation (p = 0.004). The Lean Process can be applied to interinstitutional research contracting with significant improvement in contract implementation. © 2015 Wiley Periodicals, Inc.

  6. Process Improvement for Interinstitutional Research Contracting

    PubMed Central

    Logan, Jennifer; Bjorklund, Todd; Whitfield, Jesse; Reed, Peggy; Lesher, Laurie; Sikalis, Amy; Brown, Brent; Drollinger, Sandy; Larrabee, Kristine; Thompson, Kristie; Clark, Erin; Workman, Michael; Boi, Luca

    2015-01-01

    Abstract Introduction Sponsored research increasingly requires multiinstitutional collaboration. However, research contracting procedures have become more complicated and time consuming. The perinatal research units of two colocated healthcare systems sought to improve their research contracting processes. Methods The Lean Process, a management practice that iteratively involves team members in root cause analyses and process improvement, was applied to the research contracting process, initially using Process Mapping and then developing Problem Solving Reports. Results Root cause analyses revealed that the longest delays were the individual contract legal negotiations. In addition, the “business entity” was the research support personnel of both healthcare systems whose “customers” were investigators attempting to conduct interinstitutional research. Development of mutually acceptable research contract templates and language, chain of custody templates, and process development and refinement formats decreased the Notice of Grant Award to Purchase Order time from a mean of 103.5 days in the year prior to Lean Process implementation to 45.8 days in the year after implementation (p = 0.004). Conclusions The Lean Process can be applied to interinstitutional research contracting with significant improvement in contract implementation. PMID:26083433

  7. Challenges With Research Contract Negotiations in Community-Based Cancer Research.

    PubMed

    Thompson, Michael A; Hurley, Patricia A; Faller, Bryan; Longinette, Jean; Richter, Katie; Stewart, Teresa L; Robert, Nicholas

    2016-06-01

    Community-based research programs face many barriers to participation in clinical trials. Although the majority of people with cancer are diagnosed and treated in the community setting, only roughly 3% are enrolled onto clinical trials. Research contract and budget negotiations have been consistently identified as time consuming and a barrier to participation in clinical trials. ASCO's Community Research Forum conducted a survey about specific challenges of research contract and budget negotiation processes in community-based research settings. The goal was to ultimately identify potential solutions to these barriers. A survey was distributed to 780 community-based physician investigators and research staff. The survey included questions to provide insight into contract and budget negotiation processes and perceptions about related barriers. A total of 77% of the 150 respondents acknowledged barriers in the process. Respondents most frequently identified budget-related issues (n = 133), inefficiencies in the process (n = 80), or legal review and negotiation issues (n = 70). Of the respondents, 44.1% indicated that contract research organizations made the contract negotiations process harder for their research program, and only 5% believed contract research organizations made the process easier. The contract negotiations process is perceived to be impeded by sponsors through underestimation of costs, lack of flexibility with the contract language, and excessive delays. Improving clinical trial activation processes and reducing inefficiencies would be beneficial to all interested stakeholders, including patients who may ultimately stand to benefit from participation in clinical trials. The following key recommendations were made: standardization of contracts and negotiation processes to promulgate transparency and efficiencies, improve sponsor processes to minimize burden on sites, create and promote use of contract templates and best practices, and provide education

  8. Contract Research, the University, and the Academic.

    ERIC Educational Resources Information Center

    Crawshaw, Bruce

    1985-01-01

    Implications of the growth of university-based contract research are examined, including moral and ethical issues, legal aspects, ownership of research results, staff rights, researcher status, publication, authority, responsibility, social justice, and conflicts between teaching and research. Eleven suggestions for successful contract research…

  9. Contracting in vivo research: what are the issues?

    PubMed

    Underwood, Wendy J

    2007-07-01

    As a result of increasing internal and external pressures, research institutions are using contract research organizations for the conduct of in vivo research. Many issues arise when contracting animal research, including concern regarding animal health and welfare. Each sponsor institution should develop a program for outsourced in vivo research that evaluates and ensures appropriate care and use of research animals. Each sponsoring institution should consider establishing a policy and procedure for how outsourced in vivo studies will be approved, conducted, and monitored. An approved list of contract facilities can be established on the basis of accepted standards for animal care and use. Written contracts should include confidentiality agreements, the delineation of animal ownership, and the expectation to comply with all applicable regulations and guidelines for research animal care and use. Finally, a process for communication of adverse study or animal welfare events should be established. Thorough evaluation of contract organizations will help ensure appropriate research animal care and use.

  10. 48 CFR 46.308 - Cost-reimbursement research and development contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... research and development contracts. 46.308 Section 46.308 Federal Acquisition Regulations System FEDERAL... research and development contracts. The contracting officer shall insert the clause at 52.246-8, Inspection of Research and Development—Cost-Reimbursement, in solicitations and contracts for research and...

  11. 48 CFR 46.308 - Cost-reimbursement research and development contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... research and development contracts. 46.308 Section 46.308 Federal Acquisition Regulations System FEDERAL... research and development contracts. The contracting officer shall insert the clause at 52.246-8, Inspection of Research and Development—Cost-Reimbursement, in solicitations and contracts for research and...

  12. IAEA coordinated research project on thermal-hydraulics of Supercritical Water-Cooled Reactors (SCWRs)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yamada, K.; Aksan, S. N.

    The Supercritical Water-Cooled Reactor (SCWR) is an innovative water-cooled reactor concept, which uses supercritical pressure water as reactor coolant. It has been attracting interest of many researchers in various countries mainly due to its benefits of high thermal efficiency and simple primary systems, resulting in low capital cost. The IAEA started in 2008 a Coordinated Research Project (CRP) on Thermal-Hydraulics of SCWRs as a forum to foster the exchange of technical information and international collaboration in research and development. This paper summarizes the activities and current status of the CRP, as well as major progress achieved to date. At present,more » 15 institutions closely collaborate in several tasks. Some organizations have been conducting thermal-hydraulics experiments and analysing the data, and others have been participating in code-to-test and/or code-to-code benchmark exercises. The expected outputs of the CRP are also discussed. Finally, the paper introduces several IAEA activities relating to or arising from the CRP. (authors)« less

  13. 48 CFR 46.309 - Research and development contracts (short form).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Research and development contracts (short form). 46.309 Section 46.309 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.309 Research and development contracts...

  14. 48 CFR 235.070-1 - Indemnification under research and development contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... research and development contracts. 235.070-1 Section 235.070-1 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 235.070-1 Indemnification under research and development contracts. (a...

  15. 48 CFR 970.35 - Research and development contracting.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Research and development contracting. 970.35 Section 970.35 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Major System Acquisition 970.35 Research and...

  16. 48 CFR 970.35 - Research and development contracting.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Research and development contracting. 970.35 Section 970.35 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Major System Acquisition 970.35 Research and...

  17. 48 CFR 970.35 - Research and development contracting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Research and development contracting. 970.35 Section 970.35 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Major System Acquisition 970.35 Research and...

  18. 48 CFR 970.35 - Research and development contracting.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Research and development contracting. 970.35 Section 970.35 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Major System Acquisition 970.35 Research and...

  19. 48 CFR 46.307 - Fixed-price research and development contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... REGULATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.307 Fixed-price research and development... Development—Fixed-Price, in solicitations and contracts for research and development when (1) the primary... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Fixed-price research and...

  20. IAEA support to medical physics in nuclear medicine.

    PubMed

    Meghzifene, Ahmed; Sgouros, George

    2013-05-01

    Through its programmatic efforts and its publications, the International Atomic Energy Agency (IAEA) has helped define the role and responsibilities of the nuclear medicine physicist in the practice of nuclear medicine. This paper describes the initiatives that the IAEA has undertaken to support medical physics in nuclear medicine. In 1984, the IAEA provided guidance on how to ensure that the equipment used for detecting, imaging, and quantifying radioactivity is functioning properly (Technical Document [TECDOC]-137, "Quality Control of Nuclear Medicine Instruments"). An updated version of IAEA-TECDOC-137 was issued in 1991 as IAEA-TECDOC-602, and this included new chapters on scanner-computer systems and single-photon emission computed tomography systems. Nuclear medicine physics was introduced as a part of a project on radiation imaging and radioactivity measurements in the 2002-2003 IAEA biennium program in Dosimetry and Medical Radiation Physics. Ten years later, IAEA activities in this field have expanded to cover quality assurance (QA) and quality control (QC) of nuclear medicine equipment, education and clinical training, professional recognition of the role of medical physicists in nuclear medicine physics, and finally, the coordination of research and development activities in internal dosimetry. As a result of these activities, the IAEA has received numerous requests to support the development and implementation of QA or QC programs for radioactivity measurements in nuclear medicine in many Member States. During the last 5 years, support was provided to 20 Member States through the IAEA's technical cooperation programme. The IAEA has also supported education and clinical training of medical physicists. This type of support has been essential for the development and expansion of the Medical Physics profession, especially in low- and middle-income countries. The need for basic as well as specialized clinical training in medical physics was identified as a

  1. Aspects of research and development contract terms in the bio/pharmaceutical sector.

    PubMed

    Banerjee, Tannista

    2012-01-01

    The cost of new drug development is increasing every year. Pharmaceutical companies use R&D joint ventures, mergers, and outsource different stages of pharmaceutical R&D activities for a faster and cost minimizing method of innovation. Pharmaceutical companies outsource R&D activities to independent small biotech or pharmaceutical companies that specialize in different stages of pharmaceutical R&D. This chapter examines the determinants of the payment structure of research contracts between large bio/pharmaceutical companies and specialized research firms. Determinants of R&D contracts are analyzed using detailed R&D contract data between bio/pharmaceutical companies and independent research firms for 10 years. A multinomial logit model is used in order to understand the determinants of three different types of contracts; royalty contracts, fixed payment contracts, and the mixed contracts. Under uncertainty, the likelihood of a royalty contract rises for the early stages of the research and with the patent stock of the research firm. It is more likely to observe both royalty and fixed payment if the pharmaceutical client has past contracts with the same research firm. The results also suggest that if Food and Drug Administration (FDA) is more stringent in any disease area in reviewing the new drug application, then the likelihood of signing pure royalty contract decreases. Understanding the nature of R&D contracts and the effects of FDA's behavior on the pharmaceutical R&D contract is important because these contracts not only affect the cost of new drug invention but also the quality and the rate of invention. VALUE: Results are useful for both the pharmaceutical companies and the economic/business researchers.

  2. Papers arising from IAEA Coordinated Research Project "Utilization of ion accelerators for studying and modelling of radiation induced defects in semiconductors and insulators" (F11016)

    NASA Astrophysics Data System (ADS)

    Vittone, Ettore; Breese, Mark; Simon, Aliz

    2016-04-01

    Within the International Atomic Energy Agency (IAEA) Department of Nuclear Sciences and Applications, activities are carried out to assist and advise IAEA Member States in assessing their needs for capacity building, research and development in nuclear sciences. Support is also provided to Member States' activities geared towards deriving benefits in fields such as (i) advanced materials for nuclear applications, (ii) application of accelerators and associated instrumentation, and (iii) nuclear, atomic and molecular data. One of the means that the IAEA uses to deliver its programme is Coordinated Research Projects (CRPs) which are very effective in stimulating international research and scientific interaction among the Member States.

  3. Improving Quality and Access to Radiation Therapy-An IAEA Perspective.

    PubMed

    Abdel-Wahab, May; Zubizarreta, Eduardo; Polo, Alfredo; Meghzifene, Ahmed

    2017-04-01

    The International Atomic Energy Agency (IAEA) has been involved in radiation therapy since soon after its creation in 1957. In response to the demands of Member States, the IAEA׳s activities relating to radiation therapy have focused on supporting low- and middle-income countries to set up radiation therapy facilities, expand the scope of treatments, or gradually transition to new technologies. In addition, the IAEA has been very active in providing internationally harmonized guidelines on clinical, dosimetry, medical physics, and safety aspects of radiation therapy. IAEA clinical research has provided evidence for treatment improvement as well as highly effective resource-sparing interventions. In the process, training of researchers occurs through this program. To provide this support, the IAEA works with its Member States and multiple partners worldwide through several mechanisms. In this article, we review the main activities conducted by the IAEA in support to radiation therapy. IAEA support has been crucial for achieving tangible results in many low- and middle-income countries. However, long-term sustainability of projects can present a challenge, especially when considering health budget constraints and the brain drain of skilled professionals. The need for support remains, with more than 90% of patients in low-income countries lacking access to radiotherapy. Thus, the IAEA is expected to continue its support and strengthen quality radiation therapy treatment of patients with cancer. Copyright © 2017 The Authors. Published by Elsevier Inc. All rights reserved.

  4. 48 CFR 335.071 - Special determinations and findings affecting research and development contracting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... findings affecting research and development contracting. 335.071 Section 335.071 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 335.071 Special determinations and findings affecting research and development contracting. OPDIV...

  5. 48 CFR 35.015 - Contracts for research with educational institutions and nonprofit organizations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Contracts for research with educational institutions and nonprofit organizations. 35.015 Section 35.015 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.015 Contracts for research...

  6. 48 CFR 35.015 - Contracts for research with educational institutions and nonprofit organizations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Contracts for research with educational institutions and nonprofit organizations. 35.015 Section 35.015 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.015 Contracts for research...

  7. 48 CFR 35.015 - Contracts for research with educational institutions and nonprofit organizations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Contracts for research with educational institutions and nonprofit organizations. 35.015 Section 35.015 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.015 Contracts for research...

  8. Research led by participants: a new social contract for a new kind of research

    PubMed Central

    Vayena, Effy; Brownsword, Roger; Edwards, Sarah Jane; Greshake, Bastian; Kahn, Jeffrey P; Ladher, Navjoyt; O'Connor, Daniel; O'Neill, Onora; Richards, Martin P; Rid, Annette; Sheehan, Mark; Wicks, Paul; Tasioulas, John

    2016-01-01

    In recent years, there have been prominent calls for a new social contract that accords a more central role to citizens in health research. Typically, this has been understood as citizens and patients having a greater voice and role within the standard research enterprise. Beyond this, however, it is important that the renegotiated contract specifically addresses the oversight of a new, path-breaking approach to health research: participant-led research. In light of the momentum behind participant-led research and its potential to advance health knowledge by challenging and complementing traditional research, it is vital for all stakeholders to work together in securing the conditions that will enable it to flourish. PMID:25825527

  9. Principles of Social Justice in Educational Research: The Case of Contract Research.

    ERIC Educational Resources Information Center

    Griffiths, Morwenna

    1998-01-01

    Delineates small-scale contract-research principles predicated on an understanding of social justice and of research purposes, epistemological issues, and possibilities for ethical and political action. Principles embrace improvement, knowledge and learning, changed belief systems, collaboration and consultation, openness to other communities,…

  10. 21 CFR 312.52 - Transfer of obligations to a contract research organization.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 5 2011-04-01 2011-04-01 false Transfer of obligations to a contract research... and Investigators § 312.52 Transfer of obligations to a contract research organization. (a) A sponsor... research organization. Any such transfer shall be described in writing. If not all obligations are...

  11. Databases and coordinated research projects at the IAEA on atomic processes in plasmas

    NASA Astrophysics Data System (ADS)

    Braams, Bastiaan J.; Chung, Hyun-Kyung

    2012-05-01

    The Atomic and Molecular Data Unit at the IAEA works with a network of national data centres to encourage and coordinate production and dissemination of fundamental data for atomic, molecular and plasma-material interaction (A+M/PMI) processes that are relevant to the realization of fusion energy. The Unit maintains numerical and bibliographical databases and has started a Wiki-style knowledge base. The Unit also contributes to A+M database interface standards and provides a search engine that offers a common interface to multiple numerical A+M/PMI databases. Coordinated Research Projects (CRPs) bring together fusion energy researchers and atomic, molecular and surface physicists for joint work towards the development of new data and new methods. The databases and current CRPs on A+M/PMI processes are briefly described here.

  12. Databases and coordinated research projects at the IAEA on atomic processes in plasmas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Braams, Bastiaan J.; Chung, Hyun-Kyung

    2012-05-25

    The Atomic and Molecular Data Unit at the IAEA works with a network of national data centres to encourage and coordinate production and dissemination of fundamental data for atomic, molecular and plasma-material interaction (A+M/PMI) processes that are relevant to the realization of fusion energy. The Unit maintains numerical and bibliographical databases and has started a Wiki-style knowledge base. The Unit also contributes to A+M database interface standards and provides a search engine that offers a common interface to multiple numerical A+M/PMI databases. Coordinated Research Projects (CRPs) bring together fusion energy researchers and atomic, molecular and surface physicists for joint workmore » towards the development of new data and new methods. The databases and current CRPs on A+M/PMI processes are briefly described here.« less

  13. IAEA activities related to radiation biology and health effects of radiation.

    PubMed

    Wondergem, Jan; Rosenblatt, Eduardo

    2012-03-01

    The IAEA is involved in capacity building with regard to the radiobiological sciences in its member states through its technical cooperation programme. Research projects/programmes are normally carried out within the framework of coordinated research projects (CRPs). Under this programme, two CRPs have been approved which are relevant to nuclear/radiation accidents: (1) stem cell therapeutics to modify radiation-induced damage to normal tissue, and (2) strengthening biological dosimetry in IAEA member states.

  14. USSP-IAEA WORKSHOP ON ADVANCED SENSORS FOR SAFEGUARDS.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    PEPPER,S.; QUEIROLO, A.; ZENDEL, M.

    2007-11-13

    The IAEA Medium Term Strategy (2006-2011) defines a number of specific goals in respect to the IAEA's ability to provide assurances to the international community regarding the peaceful use of nuclear energy through States adherences to their respective non-proliferation treaty commitments. The IAEA has long used and still needs the best possible sensors to detect and measure nuclear material. The Department of Safeguards, recognizing the importance of safeguards-oriented R&D, especially targeting improved detection capabilities for undeclared facilities, materials and activities, initiated a number of activities in early 2005. The initiatives included letters to Member State Support Programs (MSSPs), personal contactsmore » with known technology holders, topical meetings, consultant reviews of safeguards technology, and special workshops to identify new and novel technologies and methodologies. In support of this objective, the United States Support Program to IAEA Safeguards hosted a workshop on ''Advanced Sensors for Safeguards'' in Santa Fe, New Mexico, from April 23-27, 2007. The Organizational Analysis Corporation, a U.S.-based management consulting firm, organized and facilitated the workshop. The workshop's goal was to help the IAEA identify and plan for new sensors for safeguards implementation. The workshop, which was attended by representatives of seven member states and international organizations, included presentations by technology holders and developers on new technologies thought to have relevance to international safeguards, but not yet in use by the IAEA. The presentations were followed by facilitated breakout sessions where the participants considered two scenarios typical of what IAEA inspectors might face in the field. One scenario focused on an enrichment plant; the other scenario focused on a research reactor. The participants brainstormed using the technologies presented by the participants and other technologies known to them to propose

  15. Guidelines for cost control and analysis of cost-type research and development contracts

    NASA Technical Reports Server (NTRS)

    Sibbers, C. W.

    1981-01-01

    The cost information which should be obtained from a contractor(s) on a major, cost type research and development contract(s), and the analyses and effective use of these data are discussed. Specific type(s) of information which should be required, methods for analyzing such information, and methods for effectively using the results of such analyses to enhance NASA contract and project management are included. The material presented is based primarily on the principal methods which have been effectively used in the management of major cost type research and development contracts.

  16. Market Research Survey of Commercial Off-The-Shelf (COTS) Portable MS Systems for IAEA Safeguards Applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hart, Garret L.; Hager, George J.; Barinaga, Charles J.

    2013-02-01

    This report summarizes the results for the market research survey of mass spectrometers that are deemed pertinent to International Atomic Energy Agency (IAEA) needs and strategic objectives. The focus of the report is on MS instruments that represent currently available (or soon to be) commercial off-the shelf (COTS) technology and weigh less than 400 pounds. A compilation of all available MS instruments (36 COTS and 2 R&D) is presented, along with pertinent information regarding each instrument.

  17. 21 CFR 312.52 - Transfer of obligations to a contract research organization.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 5 2010-04-01 2010-04-01 false Transfer of obligations to a contract research organization. 312.52 Section 312.52 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN... and Investigators § 312.52 Transfer of obligations to a contract research organization. (a) A sponsor...

  18. The U.S. Public's Investment in Medical Research: An Evolving Social Contract.

    PubMed

    Heinig, Stephen J; Dev, Anurupa; Bonham, Ann C

    2016-01-01

    Medical researchers and their institutions are operating under extraordinary financial stress. More than a decade after completion of the 5-year doubling of the National Institutes of Health budget, the medical research community must confront a significant loss in National Institutes of Health purchasing power and downward pressures in federal discretionary spending. In part, this trend results from a federal budget stalemate over the growth in entitlement programs, particularly spending on medical care. This article considers the changing nature of the federal investment in medical research and the potential for medical researchers and institutions conducting the full spectrum of research to improve health system performance and health equity. In our view, continued federal investments reflect an evolving social contract for research serving the public good; the term contract is used metaphorically to represent a figurative, implicit agreement between the scientific community and the public's representatives in government. Under this conceptual contract, the American people--who are ultimately the funders of research, research training and infrastructure--expect outcomes that lead to better health, security or other benefits. The evolving contract includes expectations for more accountability, transparency, sharing of results and resources, and better integration of research systems and cultures that used to take pride in boundaries and distinctions. We outline here some of the major movements of organizations realigning to social support, which are increasingly essential to sustain public investment in medical research. Copyright © 2016 Southern Society for Clinical Investigation. Published by Elsevier Inc. All rights reserved.

  19. United States private-sector physicians and pharmaceutical contract research: a qualitative study.

    PubMed

    Fisher, Jill A; Kalbaugh, Corey A

    2012-01-01

    There have been dramatic increases over the past 20 years in the number of nonacademic, private-sector physicians who serve as principal investigators on US clinical trials sponsored by the pharmaceutical industry. However, there has been little research on the implications of these investigators' role in clinical investigation. Our objective was to study private-sector clinics involved in US pharmaceutical clinical trials to understand the contract research arrangements supporting drug development, and specifically how private-sector physicians engaged in contract research describe their professional identities. We conducted a qualitative study in 2003-2004 combining observation at 25 private-sector research organizations in the southwestern United States and 63 semi-structured interviews with physicians, research staff, and research participants at those clinics. We used grounded theory to analyze and interpret our data. The 11 private-sector physicians who participated in our study reported becoming principal investigators on industry clinical trials primarily because contract research provides an additional revenue stream. The physicians reported that they saw themselves as trial practitioners and as businesspeople rather than as scientists or researchers. Our findings suggest that in addition to having financial motivation to participate in contract research, these US private-sector physicians have a professional identity aligned with an industry-based approach to research ethics. The generalizability of these findings and whether they have changed in the intervening years should be addressed in future studies. Please see later in the article for the Editors' Summary.

  20. 48 CFR 1335.006 - Contracting methods and contract type.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 1335.006 Contracting methods and... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contracting methods and... research services under the contract might involve the use of human subjects. The provision is mandatory...

  1. United States Private-Sector Physicians and Pharmaceutical Contract Research: A Qualitative Study

    PubMed Central

    Fisher, Jill A.; Kalbaugh, Corey A.

    2012-01-01

    Background There have been dramatic increases over the past 20 years in the number of nonacademic, private-sector physicians who serve as principal investigators on US clinical trials sponsored by the pharmaceutical industry. However, there has been little research on the implications of these investigators' role in clinical investigation. Our objective was to study private-sector clinics involved in US pharmaceutical clinical trials to understand the contract research arrangements supporting drug development, and specifically how private-sector physicians engaged in contract research describe their professional identities. Methods and Findings We conducted a qualitative study in 2003–2004 combining observation at 25 private-sector research organizations in the southwestern United States and 63 semi-structured interviews with physicians, research staff, and research participants at those clinics. We used grounded theory to analyze and interpret our data. The 11 private-sector physicians who participated in our study reported becoming principal investigators on industry clinical trials primarily because contract research provides an additional revenue stream. The physicians reported that they saw themselves as trial practitioners and as businesspeople rather than as scientists or researchers. Conclusions Our findings suggest that in addition to having financial motivation to participate in contract research, these US private-sector physicians have a professional identity aligned with an industry-based approach to research ethics. The generalizability of these findings and whether they have changed in the intervening years should be addressed in future studies. Please see later in the article for the Editors' Summary. PMID:22911055

  2. PREFACE: 15th Latin American Workshop on Plasma Physics (LAWPP 2014) and 21st IAEA TM on Research Using Small Fusion Devices (RUSFD)

    NASA Astrophysics Data System (ADS)

    Iván Vargas-Blanco, V.; Herrera-Velázquez, J. Julio E.

    2015-03-01

    Written contributions from participants of the Joint 15th Latin American Workshop on Plasma Physics (LAWPP 2014) - 21st IAEA Technical Meeting on Research Using Small Fusion Devices (21st IAEA TM RUSFD). The International Advisory Committees of the 15th Latin American Workshop on Plasma Physics (LAWPP 2014) and the 21st IAEA TM on Research Using Small Fusion Devices (RUSFD), agreed to carry out together this Joint LAWPP 2014 - 21st RUSFD in San José, Costa Rica, on 27-31 January 2014. The Joint LAWPP 2014 - 21st RUSFD meeting, organized by the Instituto Tecnológico de Costa Rica, Universidad Nacional de Costa Rica, and Ad Astra Rocket Company in collaboration with the International Atomic Energy Agency (IAEA). The Latin American Workshop on Plasma Physics (LAWPP) is a series of events which has been held periodically since 1982, with the purpose of providing a forum in which the research of the Latin American plasma physics community can be displayed, as well as fostering collaborations among plasma scientists within the region and with researchers from the rest of the world. Recognized plasma scientists from developed countries are specially invited to the meeting to present the state of the art on several "hot" topics related to plasma physics. It is an open meeting, with an International Advisory Committee, in which the working language is English. It was firstly held in 1982 in Cambuquira, Brazil, followed by workshops in Medellín, Colombia (1985), Santiago de Chile, Chile (1988), Buenos Aires, Argentina (1990), Mexico City, Mexico (1992), Foz do Iguaçu, Brazil (1994, combined with the International Congress on Plasma Physics (ICPP)), Caracas, Venezuela (1997), Tandil, Argentina (1998), La Serena, Chile (2000), Sao Pedro, Brazil (2003), Mexico City, Mexico (2005), Caracas, Venezuela (2007), Santiago de Chile, Chile (2010, combined with the ICPP) and Mar de Plata, Argentina (2011). The 21st IAEA TM on Research Using Small Fusion Devices is an ideal forum for

  3. Collaborative Research: The Alphabetic Braille and Contracted Braille Study as an Example of Collaborative Research

    ERIC Educational Resources Information Center

    Wormsley, Diane P.; Emerson, Robert Wall; Erin, Jane

    2011-01-01

    This article examines the Alphabetic Braille Contracted Braille Study in relation to the dimensions of collaborative research: extent, intensity, substance, heterogeneity, velocity, formality, and productivity. It also discusses the dimensions of financing research and researchers' attitudes. The overall consensus is that the study would not have…

  4. University Research and Development Activities: The Federal Income Tax Consequences of Research Contracts, Research Subsidiaries and Joint Ventures.

    ERIC Educational Resources Information Center

    Kertz, Consuelo Lauda; Hasson, James K., Jr.

    1986-01-01

    Features of the federal income tax law applying to income received from commercially funded university-based scientific research and development activities are discussed, including: industry-sponsored research contracts, separately incorporated entities, partnerships and joint ventures, subsidiaries and unrelated income consequences of…

  5. 48 CFR 53.235 - Research and Development Contracting (SF 298).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 2 2013-10-01 2013-10-01 false Research and Development... REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Prescription of Forms 53.235 Research and Development... scientific and technical reports to contracting officers and to technical information libraries, as specified...

  6. 48 CFR 53.235 - Research and Development Contracting (SF 298).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 2 2011-10-01 2011-10-01 false Research and Development... REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Prescription of Forms 53.235 Research and Development... scientific and technical reports to contracting officers and to technical information libraries, as specified...

  7. 48 CFR 53.235 - Research and Development Contracting (SF 298).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 2 2012-10-01 2012-10-01 false Research and Development... REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Prescription of Forms 53.235 Research and Development... scientific and technical reports to contracting officers and to technical information libraries, as specified...

  8. 48 CFR 53.235 - Research and Development Contracting (SF 298).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Research and Development... REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Prescription of Forms 53.235 Research and Development... scientific and technical reports to contracting officers and to technical information libraries, as specified...

  9. 48 CFR 53.235 - Research and Development Contracting (SF 298).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 2 2014-10-01 2014-10-01 false Research and Development... REGULATION (CONTINUED) CLAUSES AND FORMS FORMS Prescription of Forms 53.235 Research and Development... scientific and technical reports to contracting officers and to technical information libraries, as specified...

  10. Managed Utility Services Contracts | Climate Neutral Research Campuses |

    Science.gov Websites

    the energy cost savings generated by the project. Managed Utility Services Contracts In a Managed . The owner, in this case the research campus, bears no upfront cost through this agreement, pays the revenue to capital cost repayment and maintenance costs. In addition to removing the burden of an upfront

  11. Recommended observational skills training for IAEA safeguards inspections. Final report: Recommended observational skills training for IAEA safeguards inspections

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Toquam, J.L.; Morris, F.A.

    This is the second of two reports prepared to assist the International Atomic Energy Agency (IAEA or Agency) in enhancing the effectiveness of its international safeguards inspections through inspector training in {open_quotes}Observational Skills{close_quotes}. The first (Phase 1) report was essentially exploratory. It defined Observational Skills broadly to include all appropriate cognitive, communications, and interpersonal techniques that have the potential to help IAEA safeguards inspectors function more effectively. It identified 10 specific Observational Skills components, analyzed their relevance to IAEA safeguards inspections, and reviewed a variety of inspection programs in the public and private sectors that provide training in one ormore » more of these components. The report concluded that while it should be possible to draw upon these other programs in developing Observational Skills training for IAEA inspectors, the approaches utilized in these programs will likely require significant adaption to support the specific job requirements, policies, and practices that define the IAEA inspector`s job. The overall objective of this second (Phase 2) report is to provide a basis for the actual design and delivery of Observational Skills training to IAEA inspectors. The more specific purposes of this report are to convey a fuller understanding of the potential application of Observational Skills to the inspector`s job, describe inspector perspectives on the relevance and importance of particular Observational Skills, identify the specific Observational Skill components that are most important and relevant to enhancing safeguards inspections, and make recommendations as to Observational Skills training for the IAEA`s consideration in further developing its Safeguards training program.« less

  12. Policy Development for Research Grants, and Contracts Administration in the Small College or University.

    ERIC Educational Resources Information Center

    Lyons, Paul R.

    Some of the major administrative factors that will require attention by small colleges and universities as they develop policy and general procedures for the administration of research, grants, and contracts are considered. Management of research, grants, and contracts is a process that involves the review and approval of proposals; project…

  13. 48 CFR 227.7204 - Contracts under the Small Business Innovative Research Program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Business Innovative Research Program. 227.7204 Section 227.7204 Federal Acquisition Regulations System... under the Small Business Innovative Research Program. When contracting under the Small Business Innovative Research Program, follow the procedures at 227-7104. ...

  14. IAEA Nuclear Data Section: provision of atomic and nuclear databases for user applications.

    PubMed

    Humbert, Denis P; Nichols, Alan L; Schwerer, Otto

    2004-01-01

    The Nuclear Data Section (NDS) of the International Atomic Energy Agency (IAEA) provides a wide range of atomic and nuclear data services to scientists worldwide, with particular emphasis placed on the needs of developing countries. Highly focused Co-ordinated Research Projects and multinational data networks are sponsored under the auspices of the IAEA for the development and assembly of databases through the organised participation of specialists from Member States. More than 100 data libraries are readily available cost-free through the Internet, CD-ROM and other media. These databases are used in a wide range of applications, including fission- and fusion-energy, non-energy applications and basic research studies. Further information concerning the various services can be found through the web address of the IAEA Nuclear Data Section: and a mirror site at IPEN, Brazil that is maintained by NDS staff:.

  15. Trip report on IAEA Training Workshop on Implementation of Integrated Management Systems for Research Reactors (T3-TR-45496).

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pratt, Richard J.

    2013-11-01

    From 17-21 June 2013, Sandia National Laboratories, Technical Area-V (SNL TA-V) represented the United States Department of Energy/National Nuclear Security Administration (DOE/NNSA) at the International Atomic Energy Agency (IAEA) Training Workshop (T3-TR-45486). This report gives a breakdown of the IAEA regulatory structure for those unfamiliar, and the lessons learned and observations that apply to SNL TA-V that were obtained from the workshop. The Safety Report Series, IAEA workshop final report, and SNL TA-V presentation are included as attachments.

  16. Into the Looking Glass: Psychological Contracts in Research Administration

    ERIC Educational Resources Information Center

    Hicks, Melanie; Monroy-Paz, Jorge

    2015-01-01

    In a world of fast moving technology, pressure cooker work climates and stretched resources, productivity, employee engagement, and talent retention are critical to the success of any organization. Research administration offices are no exception. Psychological contract theory provides insightful illumination on reactions to these environments by…

  17. 77 FR 47797 - Federal Acquisition Regulation; Small Business Set Asides for Research and Development Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-10

    ... Acquisition Regulation; Small Business Set Asides for Research and Development Contracts AGENCY: Department of... Acquisition Regulation (FAR) to clarify that contracting officers shall set aside acquisitions for research..., and NASA are proposing to amend the Federal Acquisition Regulation (FAR) to revise paragraph (b)(2) of...

  18. Clinical trials and contract research organizations in India.

    PubMed

    Mukherjee, Shoibal

    2012-06-01

    Economics and demography are driving drug development to the developing world. India needs this opportunity to build research skills required to combat its enormous disease burden. A variety of global and local contract research organizations (CROs) that specialize in the execution of research to develop health care products operate in India today. CROs assure quality and compliance to regulations while coordinating with tertiary providers such as a site management organization and the central laboratory. Back room operations to manage, analyze, and report data form a bulk of the employment generated by clinical research, absorbing programmers, data managers, biostatisticians,and medical writers. Despite rapid growth and strong potential, India remains a minor contributor to global pharmaceutical research because of policy stagnation, regulatory gaps, and misinformed controversies in the media.

  19. 48 CFR 227.7204 - Contracts under the Small Business Innovation Research Program.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Business Innovation Research Program. 227.7204 Section 227.7204 Federal Acquisition Regulations System... under the Small Business Innovation Research Program. When contracting under the Small Business Innovation Research Program, follow the procedures at 227-7104. [56 FR 36389, July 31, 1991, as amended at 76...

  20. 48 CFR 227.7204 - Contracts under the Small Business Innovation Research Program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Business Innovation Research Program. 227.7204 Section 227.7204 Federal Acquisition Regulations System... under the Small Business Innovation Research Program. When contracting under the Small Business Innovation Research Program, follow the procedures at 227-7104. [56 FR 36389, July 31, 1991, as amended at 76...

  1. 48 CFR 227.7204 - Contracts under the Small Business Innovation Research Program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Business Innovation Research Program. 227.7204 Section 227.7204 Federal Acquisition Regulations System... under the Small Business Innovation Research Program. When contracting under the Small Business Innovation Research Program, follow the procedures at 227-7104. [56 FR 36389, July 31, 1991, as amended at 76...

  2. 48 CFR 227.7204 - Contracts under the Small Business Innovation Research Program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Business Innovation Research Program. 227.7204 Section 227.7204 Federal Acquisition Regulations System... under the Small Business Innovation Research Program. When contracting under the Small Business Innovation Research Program, follow the procedures at 227-7104. [56 FR 36389, July 31, 1991, as amended at 76...

  3. 10 CFR 75.7 - Notification of IAEA safeguards.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Notification of IAEA safeguards. 75.7 Section 75.7 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) SAFEGUARDS ON NUCLEAR MATERIAL-IMPLEMENTATION OF US/IAEA AGREEMENT General Provisions § 75.7 Notification of IAEA safeguards. (a) The licensee must inform the NRC...

  4. 10 CFR 75.7 - Notification of IAEA safeguards.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Notification of IAEA safeguards. 75.7 Section 75.7 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) SAFEGUARDS ON NUCLEAR MATERIAL-IMPLEMENTATION OF US/IAEA AGREEMENT General Provisions § 75.7 Notification of IAEA safeguards. (a) The licensee must inform the NRC...

  5. Contracts.

    ERIC Educational Resources Information Center

    Gellert, Shepard D.; Wilson, Grace

    1977-01-01

    This paper reviews experimental psychology goal research and its implications for the therapist doing contract therapy. Clinical examples of various levels of contracts give illustrations, and a technique, the therapeutic double bind, as a form of contract, is detailed. A case study is presented to illustrate the use of the theory. Three…

  6. Improving the Transparency of IAEA Safeguards Reporting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Toomey, Christopher; Hayman, Aaron M.; Wyse, Evan T.

    2011-07-17

    In 2008, the Standing Advisory Group on Safeguards Implementation (SAGSI) indicated that the International Atomic Energy Agency's (IAEA) Safeguards Implementation Report (SIR) has not kept pace with the evolution of safeguards and provided the IAEA with a set of recommendations for improvement. The SIR is the primary mechanism for providing an overview of safeguards implementation in a given year and reporting on the annual safeguards findings and conclusions drawn by the Secretariat. As the IAEA transitions to State-level safeguards approaches, SIR reporting must adapt to reflect these evolutionary changes. This evolved report will better reflect the IAEA's transition to amore » more qualitative and information-driven approach, based upon State-as-a-whole considerations. This paper applies SAGSI's recommendations to the development of multiple models for an evolved SIR and finds that an SIR repurposed as a 'safeguards portal' could significantly enhance information delivery, clarity, and transparency. In addition, this paper finds that the 'portal concept' also appears to have value as a standardized information presentation and analysis platform for use by Country Officers, for continuity of knowledge purposes, and the IAEA Secretariat in the safeguards conclusion process. Accompanying this paper is a fully functional prototype of the 'portal' concept, built using commercial software and IAEA Annual Report data.« less

  7. Certified reference materials for radionuclides in Bikini Atoll sediment (IAEA-410) and Pacific Ocean sediment (IAEA-412).

    PubMed

    Pham, M K; van Beek, P; Carvalho, F P; Chamizo, E; Degering, D; Engeler, C; Gascó, C; Gurriaran, R; Hanley, O; Harms, A V; Herrmann, J; Hult, M; Ikeuchi, Y; Ilchmann, C; Kanisch, G; Kis-Benedek, G; Kloster, M; Laubenstein, M; Llaurado, M; Mas, J L; Nakano, M; Nielsen, S P; Osvath, I; Povinec, P P; Rieth, U; Schikowski, J; Smedley, P A; Suplinska, M; Sýkora, I; Tarjan, S; Varga, B; Vasileva, E; Zalewska, T; Zhou, W

    2016-03-01

    The preparation and characterization of certified reference materials (CRMs) for radionuclide content in sediments collected offshore of Bikini Atoll (IAEA-410) and in the open northwest Pacific Ocean (IAEA-412) are described and the results of the certification process are presented. The certified radionuclides include: (40)K, (210)Pb ((210)Po), (226)Ra, (228)Ra, (228)Th, (232)Th, (234)U, (238)U, (239)Pu, (239+240)Pu and (241)Am for IAEA-410 and (40)K, (137)Cs, (210)Pb ((210)Po), (226)Ra, (228)Ra, (228)Th, (232)Th, (235)U, (238)U, (239)Pu, (240)Pu and (239+240)Pu for IAEA-412. The CRMs can be used for quality assurance and quality control purposes in the analysis of radionuclides in sediments, for development and validation of analytical methods and for staff training. Copyright © 2015 Elsevier Ltd. All rights reserved.

  8. Emerging trends in contract research industry in India.

    PubMed

    Drabu, Sushma; Gupta, Alka; Bhadauria, Anupama

    2010-09-01

    A Contract Research Organization (CRO) is a service organization that provides support to the pharmaceutical industry and offers a wide range of "outsourced" pharmaceutical research services to aid in R&D process and is thus an essential tool for undertaking clinical trials in the present scenario when high stakes are involved in the drug discovery process. This industry also offers a safe option of investment as the industry is largely recession-proof, with a significant upscale growth. Presently India occupies a very small pie of the global market share in the Clinical Trials Industry but it is estimated to conduct nearly 5% of global clinical trials by 2012. The global CRO industry valued $18 bn in 2008 and the market is expected to grow at an annual rate of 14% between 2009 and 13. Top multinational pharmaceuticals companies are venturing into the Indian business, in collaboration with the Indian Drug Companies. According to a recent study by Mckinsey & Company, the Indian Clinical Research Industry can attract $1.5 bn of revenue from US and EU by 2010. Such an increase in outsourcing from the western countries has led the global pharma companies and Indian entrepreneurs to set up Contract Research Organizations (CROs) in India. To bring this into realization and fulfil the market demand, while simultaneously aiding in improving the country's economical standards and market position, joint and well-coordinated efforts on part of the government, industry, and working professionals are needed in terms of regulatory affairs, audits, transparency in work affairs, garnering patient confidence, and pharmacovigilance. Copyright 2010 Elsevier Inc. All rights reserved.

  9. IAEA Co-ordinated Research Project: update of X-ray and gamma-ray decay data standards for detector calibration and other applications.

    PubMed

    Nichols, Alan L

    2004-01-01

    A Co-ordinated Research Project (CRP) was established in 1998 by the IAEA Nuclear Data Section (Update of X-ray and gamma-ray Decay Data Standards for Detector Calibration and Other Applications), in order to improve further the recommended decay data used to undertake efficiency calibrations of gamma-ray detectors. Participants in this CRP reviewed and modified the list of radionuclides most suited for detector efficiency calibration, and also considered the decay-data needs for safeguards, waste management, dosimetry, nuclear medicine, material analysis and environmental monitoring. Overall, 62 radionuclides were selected for decay-data evaluation, along with four parent-daughter combinations and two natural decay chains. gamma-ray emissions from specific nuclear reactions were also included to extend the calibrant energy well beyond 10 MeV. A significant number of these decay-data evaluations have been completed, and an IAEA-TECDOC report and database are in the process of being assembled for planned completion by the end of 2003.

  10. An IAEA multi-technique X-ray spectrometry endstation at Elettra Sincrotrone Trieste: benchmarking results and interdisciplinary applications.

    PubMed

    Karydas, Andreas Germanos; Czyzycki, Mateusz; Leani, Juan José; Migliori, Alessandro; Osan, Janos; Bogovac, Mladen; Wrobel, Pawel; Vakula, Nikita; Padilla-Alvarez, Roman; Menk, Ralf Hendrik; Gol, Maryam Ghahremani; Antonelli, Matias; Tiwari, Manoj K; Caliri, Claudia; Vogel-Mikuš, Katarina; Darby, Iain; Kaiser, Ralf Bernd

    2018-01-01

    The International Atomic Energy Agency (IAEA) jointly with the Elettra Sincrotrone Trieste (EST) operates a multipurpose X-ray spectrometry endstation at the X-ray Fluorescence beamline (10.1L). The facility has been available to external users since the beginning of 2015 through the peer-review process of EST. Using this collaboration framework, the IAEA supports and promotes synchrotron-radiation-based research and training activities for various research groups from the IAEA Member States, especially those who have limited previous experience and resources to access a synchrotron radiation facility. This paper aims to provide a broad overview about various analytical capabilities, intrinsic features and performance figures of the IAEA X-ray spectrometry endstation through the measured results. The IAEA-EST endstation works with monochromatic X-rays in the energy range 3.7-14 keV for the Elettra storage ring operating at 2.0 or 2.4 GeV electron energy. It offers a combination of different advanced analytical probes, e.g. X-ray reflectivity, X-ray absorption fine-structure measurements, grazing-incidence X-ray fluorescence measurements, using different excitation and detection geometries, and thereby supports a comprehensive characterization for different kinds of nanostructured and bulk materials.

  11. NASA's university program: Active grants and research contracts, fiscal year 1975

    NASA Technical Reports Server (NTRS)

    1975-01-01

    Active university research projects for Fiscal Year 1975 are reported by state, and foreign country. Cross indexes by: (1) grant/contract number; (2) field of science and engineering; (3) technical officer location; and (4) RTOP are included.

  12. RECRUITMENT OF U.S. CITIZENS FOR VACANCIES IN IAEA SAFEGUARDS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    PEPPER,S.E.; DECARO,D.; WILLIAMS,G.

    The International Atomic Energy Agency (IAEA) relies on its member states to assist with recruiting qualified individuals for positions within the IAEA's secretariat. It is important that persons within and outside the US nuclear and safeguards industries become aware of career opportunities available at the IAEA, and informed about important vacancies. The IAEA has established an impressive web page to advertise opportunities for employment. However, additional effort is necessary to ensure that there is sufficient awareness in the US of these opportunities, and assistance for persons interested in taking positions at the IAEA. In 1998, the Subgroup on Safeguards Technicalmore » Support (SSTS) approved a special task under the US Support Program to IAEA Safeguards (USSP) for improving US efforts to identify qualified candidates for vacancies in IAEA's Department of Safeguards. The International Safeguards Project Office (ISPO) developed a plan that includes increased advertising, development of a web page to support US recruitment efforts, feedback from the US Mission in Vienna, and interaction with other recruitment services provided by US professional organizations. The main purpose of this effort is to educate US citizens about opportunities at the IAEA so that qualified candidates can be identified for the IAEA's consideration.« less

  13. 48 CFR 1235.7000 - Contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING Research Misconduct 1235.7000 Contract clause. The contracting officer shall insert the clause at (TAR) 48 CFR 1252.235-70, Research Misconduct, in... Policy on Research Misconduct,” dated February 2002. ...

  14. 48 CFR 1235.7000 - Contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING Research Misconduct 1235.7000 Contract clause. The contracting officer shall insert the clause at (TAR) 48 CFR 1252.235-70, Research Misconduct, in... Policy on Research Misconduct,” dated February 2002. ...

  15. 48 CFR 1235.7000 - Contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING Research Misconduct 1235.7000 Contract clause. The contracting officer shall insert the clause at (TAR) 48 CFR 1252.235-70, Research Misconduct, in... Policy on Research Misconduct,” dated February 2002. ...

  16. 48 CFR 1235.7000 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING Research Misconduct 1235.7000 Contract clause. The contracting officer shall insert the clause at (TAR) 48 CFR 1252.235-70, Research Misconduct, in... Policy on Research Misconduct,” dated February 2002. ...

  17. 10 CFR 75.12 - Communication of information to IAEA.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Communication of information to IAEA. 75.12 Section 75.12 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) SAFEGUARDS ON NUCLEAR MATERIAL-IMPLEMENTATION OF US/IAEA AGREEMENT Facility and Location Information § 75.12 Communication of information to IAEA. (a) Except as...

  18. 10 CFR 75.12 - Communication of information to IAEA.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Communication of information to IAEA. 75.12 Section 75.12 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) SAFEGUARDS ON NUCLEAR MATERIAL-IMPLEMENTATION OF US/IAEA AGREEMENT Facility and Location Information § 75.12 Communication of information to IAEA. (a) Except as...

  19. 48 CFR 35.006 - Contracting methods and contract type.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... indicated a high degree of probability that development is feasible and (2) the Government has determined... SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 35.006 Contracting methods and..., performance objectives, and specifications for the work can be defined will largely determine the type of...

  20. Liquid Modernity: Exploring the Research Contract Nexus within Contemporary Scottish Political Culture

    ERIC Educational Resources Information Center

    Holligan, Chris

    2013-01-01

    This paper contributes to our understanding of a supposed free-market in research, where knowledge-transfer is to government, which then brokers the evidence into professional fields. Education research contracts are put out to tender by Scottish Government and a constellation of factors constructing this phenomenon has epistemological and…

  1. 48 CFR 1352.235-73 - Research involving human subjects-after initial contract award.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Research involving human... Provisions and Clauses 1352.235-73 Research involving human subjects—after initial contract award. As prescribed in 48 CFR 1335.006(d), insert the following clause: Research Involving Human Subjects—After...

  2. 48 CFR 1352.235-73 - Research involving human subjects-after initial contract award.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Research involving human... Provisions and Clauses 1352.235-73 Research involving human subjects—after initial contract award. As prescribed in 48 CFR 1335.006(d), insert the following clause: Research Involving Human Subjects—After...

  3. 48 CFR 1352.235-73 - Research involving human subjects-after initial contract award.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Research involving human... Provisions and Clauses 1352.235-73 Research involving human subjects—after initial contract award. As prescribed in 48 CFR 1335.006(d), insert the following clause: Research Involving Human Subjects—After...

  4. Evaluation of contract time estimation and contracting procedures : technical summary.

    DOT National Transportation Integrated Search

    1996-08-01

    The objective of this research was 1) to provide the DOTD with a systematic approach to the determination of contract duration, and 2) to explore innovative contracting procedures that may prove beneficial in DOTD projects. The innovative contracting...

  5. 48 CFR 250.104-3-70 - Indemnification under contracts involving both research and development and other work.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contracts involving both research and development and other work. 250.104-3-70 Section 250.104-3-70 Federal... MANAGEMENT EXTRAORDINARY CONTRACTUAL ACTIONS AND THE SAFETY ACT Extraordinary Contractual Actions 250.104-3-70 Indemnification under contracts involving both research and development and other work. When...

  6. 48 CFR 1235.7000 - Contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... all solicitations and contracts for research and development. For further information, see DOT's Implementation Guidance for Executive Office of the President, Office of Science and Technology Policy, “Federal... OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING Research Misconduct 1235.7000 Contract clause...

  7. Alternative contracting research : final report.

    DOT National Transportation Integrated Search

    2016-08-01

    Alternative contracting methods have become popular alternatives to the traditional practice whose emphasis is on low bid acquisition. The benefits of decreased project schedule, increased job quality, and improved delivery process have demonstrated ...

  8. IAEA Coordinated Research Project on HTGR Reactor Physics, Thermal-hydraulics and Depletion Uncertainty Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Strydom, Gerhard; Bostelmann, F.

    The continued development of High Temperature Gas Cooled Reactors (HTGRs) requires verification of HTGR design and safety features with reliable high fidelity physics models and robust, efficient, and accurate codes. The predictive capability of coupled neutronics/thermal-hydraulics and depletion simulations for reactor design and safety analysis can be assessed with sensitivity analysis (SA) and uncertainty analysis (UA) methods. Uncertainty originates from errors in physical data, manufacturing uncertainties, modelling and computational algorithms. (The interested reader is referred to the large body of published SA and UA literature for a more complete overview of the various types of uncertainties, methodologies and results obtained).more » SA is helpful for ranking the various sources of uncertainty and error in the results of core analyses. SA and UA are required to address cost, safety, and licensing needs and should be applied to all aspects of reactor multi-physics simulation. SA and UA can guide experimental, modelling, and algorithm research and development. Current SA and UA rely either on derivative-based methods such as stochastic sampling methods or on generalized perturbation theory to obtain sensitivity coefficients. Neither approach addresses all needs. In order to benefit from recent advances in modelling and simulation and the availability of new covariance data (nuclear data uncertainties) extensive sensitivity and uncertainty studies are needed for quantification of the impact of different sources of uncertainties on the design and safety parameters of HTGRs. Only a parallel effort in advanced simulation and in nuclear data improvement will be able to provide designers with more robust and well validated calculation tools to meet design target accuracies. In February 2009, the Technical Working Group on Gas-Cooled Reactors (TWG-GCR) of the International Atomic Energy Agency (IAEA) recommended that the proposed Coordinated Research Program

  9. IAEA activities on atomic, molecular and plasma-material interaction data for fusion

    NASA Astrophysics Data System (ADS)

    Braams, Bastiaan J.; Chung, Hyun-Kyung

    2013-09-01

    The IAEA Atomic and Molecular Data Unit (http://www-amdis.iaea.org/) aims to provide internationally evaluated and recommended data for atomic, molecular and plasma-material interaction (A+M+PMI) processes in fusion research. The Unit organizes technical meetings and coordinates an A+M Data Centre Network (DCN) and a Code Centre Network (CCN). In addition the Unit organizes Coordinated Research Projects (CRPs), for which the objectives are mixed between development of new data and evaluation and recommendation of existing data. In the area of A+M data we are placing new emphasis in our meeting schedule on data evaluation and especially on uncertainties in calculated cross section data and the propagation of uncertainties through structure data and fundamental cross sections to effective rate coefficients. Following a recent meeting of the CCN it is intended to use electron scattering on Be, Ne and N2 as exemplars for study of uncertainties and uncertainty propagation in calculated data; this will be discussed further at the presentation. Please see http://www-amdis.iaea.org/CRP/ for more on our active and planned CRPs, which are concerned with atomic processes in core and edge plasma and with plasma interaction with beryllium-based surfaces and with irradiated tungsten.

  10. The Construction of Academic Time: Sub/Contracting Academic Labour in Research.

    ERIC Educational Resources Information Center

    Hey, Valerie

    2001-01-01

    Offers a poststructuralist analysis of the UK higher education sector's academic division of labor, exploring some new contradictions from a contract researcher's standpoint. Raises political, social, and methodological questions about these divisions by exploring their class and gender dimensions. Too many academics remain silent about adverse…

  11. 15 CFR 734.11 - Government-sponsored research covered by contract controls.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 2 2010-01-01 2010-01-01 false Government-sponsored research covered by contract controls. 734.11 Section 734.11 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE EXPORT...

  12. 48 CFR 2035.70 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 2035.70 Contract clauses. (a) The contracting officer shall insert the following clause in all solicitations and contracts for research and development by private contractors and universities and for other technical services, as appropriate: (1) Section 2052.235-70...

  13. Big-pharmaceuticalisation: clinical trials and Contract Research Organisations in India.

    PubMed

    Sariola, Salla; Ravindran, Deapica; Kumar, Anand; Jeffery, Roger

    2015-04-01

    The World Trade Organisation's Trade Related Intellectual Property Rights [TRIPS] agreement aimed to harmonise intellectual property rights and patent protection globally. In India, the signing of this agreement resulted in a sharp increase in clinical trials since 2005. The Indian government, along with larger Indian pharmaceutical companies, believed that they could change existing commercial research cultures through the promotion of basic research as well as attracting international clinical trials, and thus create an international level, innovation-based drug industry. The effects of the growth of these outsourced and off-shored clinical trials on local commercial knowledge production in India are still unclear. What has been the impact of the increasing scale and commercialisation of clinical research on corporate science in India? In this paper we describe Big-pharmaceuticalisation in India, whereby the local pharmaceutical industry is moving from generic manufacturing to innovative research. Using conceptual frameworks of pharmaceuticalisation and innovation, this paper analyses data from research conducted in 2010-2012 and describes how Contract Research Organisations (CROs) enable outsourcing of randomised control trials to India. Focussing on twenty-five semi-structured interviews CRO staff, we chart the changes in Indian pharmaceutical industry, and implications for local research cultures. We use Big-pharmaceuticalisation to extend the notion of pharmaceuticalisation to describe the spread of pharmaceutical research globally and illustrate how TRIPS has encouraged a concentration of capital in India, with large companies gaining increasing market share and using their market power to rewrite regulations and introduce new regulatory practices in their own interest. Contract Research Organisations, with relevant, new, epistemic skills and capacities, are both manifestations of the changes in commercial research cultures, as well as the vehicles to

  14. Animal electricity, Ca2+ and muscle contraction. A brief history of muscle research.

    PubMed

    Martonosi, A N

    2000-01-01

    This brief review attempts to summarize some of the major phases of muscle research from Leeuwenhoek's description of sarcomeres in 1674, through Galvani's observation of "animal electricity" in 1791, to the discovery of Ca2+ as the key messenger in the coupling of nerve excitation to muscle contraction. The emerging molecular mechanism of the contraction process is one of the great achievements of biology, reflecting the intimate links between physics, chemistry and the life Sciences in the solution of biological problems.

  15. Coordinating ‘Ethical’ Clinical Trials: The Role of Research Coordinators in the Contract Research Industry

    PubMed Central

    Fisher, Jill A.

    2010-01-01

    Change in the way new drugs are developed, including the privatization of clinical trials, has altered the arrangement and roles of health care professions. In this article I examine one aspect of this change: the role of research coordinators in the conduct of contract research in the United States. My focus on coordinators highlights the ethical conflicts embedded in clinical trials. I describe the ways in which coordinators experience and contend with the conflict between research and care and show how their construction of ethics is distinct from institutional conceptions formally associated with human subjects research. My analysis demonstrates how the coordinators' focus on ethics is a response to their role conflict and an attempt to reinsert individualized care into the context of research. PMID:17184412

  16. 75 FR 990 - HHS Intent To Publish Grant and Contract Solicitations for Comparative Effectiveness Research...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-07

    ... Publish Grant and Contract Solicitations for Comparative Effectiveness Research (CER) Projects With Funds... input, the Comparative Effectiveness Research- Coordination Implementation Team, the Federal Coordinating Council for Comparative Effectiveness Research (FCC), and the Institute of Medicine Report on CER...

  17. IAEA Sampling Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Geist, William H.

    2017-09-15

    The objectives for this presentation are to describe the method that the IAEA uses to determine a sampling plan for nuclear material measurements; describe the terms detection probability and significant quantity; list the three nuclear materials measurement types; describe the sampling method applied to an item facility; and describe multiple method sampling.

  18. Testing the validity of the International Atomic Energy Agency (IAEA) safety culture model.

    PubMed

    López de Castro, Borja; Gracia, Francisco J; Peiró, José M; Pietrantoni, Luca; Hernández, Ana

    2013-11-01

    This paper takes the first steps to empirically validate the widely used model of safety culture of the International Atomic Energy Agency (IAEA), composed of five dimensions, further specified by 37 attributes. To do so, three independent and complementary studies are presented. First, 290 students serve to collect evidence about the face validity of the model. Second, 48 experts in organizational behavior judge its content validity. And third, 468 workers in a Spanish nuclear power plant help to reveal how closely the theoretical five-dimensional model can be replicated. Our findings suggest that several attributes of the model may not be related to their corresponding dimensions. According to our results, a one-dimensional structure fits the data better than the five dimensions proposed by the IAEA. Moreover, the IAEA model, as it stands, seems to have rather moderate content validity and low face validity. Practical implications for researchers and practitioners are included. Copyright © 2013 Elsevier Ltd. All rights reserved.

  19. 48 CFR 10.003 - Contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... MARKET RESEARCH 10.003 Contract clause. The contracting officer shall insert the clause at 52.210-1, Market Research, in solicitations and contracts over $5 million for the procurement of items other than...

  20. Hospital contract management: a descriptive profile.

    PubMed Central

    Alexander, J A; Lewis, B L

    1984-01-01

    Despite the dramatic growth in hospital contract management in the last decade, research only recently has begun to provide insights into the structure, operation, and effectiveness of these arrangements. Two descriptive questions regarding hospital contract management are addressed in an effort to increase correspondence between theoretical and evaluative research in this area: (1) how do contract-managed hospitals differ from traditionally managed hospitals? and (2) how do contract-managed hospitals differ from each other? Principal discriminating variables in the analyses are hospital size, control, urban-rural location, region, management organization control, and management organization size. Results of the analysis on a sample of 406 contract-managed hospitals and 401 unaffiliated hospitals reveal important differences between contract-managed and traditionally managed hospitals as well as among contract management organizations. These findings are discussed in terms of their implications for future research and performance evaluations on contract management arrangements. PMID:6490376

  1. 48 CFR 1352.235-73 - Research involving human subjects-after initial contract award.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... identifiable private information. The term “research” means a systematic investigation, including research... established a relationship with an appropriate Institutional Review Board (“cognizant IRB”). An appropriate... appropriate documentation to the Contracting Officer for Government institutional review and approval. This...

  2. 48 CFR 11.503 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., Liquidated Damages—Supplies, Services, or Research and Development, in fixed-price solicitations and contracts for supplies, services, or research and development when the contracting officer determines that...—Construction, in solicitations and contracts for construction, other than cost-plus-fixed-fee, when the...

  3. United States Navy Contracting Officer Warranting Process

    DTIC Science & Technology

    2011-03-01

    by 30% or more of the respondents: Contract Law , Cost Analysis, Market Research, Contract Source Selection, Simplified Acquisition Procedures, and...that the majority of AOs found the following course at least somewhat important: Contract Law , Cost Analysis, Market Research, Contract 52 Source...the budget and appropriation cycle 4. Ethics and conduct standards 5. Basic contract laws and regulations 6. Socio-economic requirements in

  4. Contract Funding Opportunities Available for Innovative SBIR Development | Office of Cancer Clinical Proteomics Research

    Cancer.gov

    Does your small business need early-stage financing to take its cancer research to the next level? The National Cancer Institute Small Business Innovation Research (NCI SBIR) Development Center has released $5 million for new contract funding opportunities to support cancer research and technology development in key emerging areas of need. The NCI SBIR can help you finance and advance innovations in cancer prevention, diagnosis, treatment, and basic research.

  5. 48 CFR 235.072 - Additional contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 252.235-7011, Final Scientific or Technical Report, in solicitations and contracts for research and... SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 235... involving research on live vertebrate animals. (b) Use the clause at 252.235-7003, Frequency Authorization...

  6. 48 CFR 235.072 - Additional contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 252.235-7011, Final Scientific or Technical Report, in solicitations and contracts for research and... SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 235... involving research on live vertebrate animals. (b) Use the clause at 252.235-7003, Frequency Authorization...

  7. 48 CFR 227.7104 - Contracts under the Small Business Innovation Research (SBIR) Program.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Data and Computer Software—Small Business Innovation Research (SBIR) Program, when technical data or computer software will be generated during performance of contracts under the SBIR program. (b) Under the clause at 252.227-7018, the Government obtains SBIR data rights in technical data and computer software...

  8. 48 CFR 227.7104 - Contracts under the Small Business Innovation Research (SBIR) Program.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Data and Computer Software—Small Business Innovation Research (SBIR) Program, when technical data or computer software will be generated during performance of contracts under the SBIR program. (b) Under the clause at 252.227-7018, the Government obtains SBIR data rights in technical data and computer software...

  9. International Scavenging for First Responder Guidance and Tools: IAEA Products

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stern, W.; Berthelot, L.; Bachner, K.

    In fiscal years (FY) 2016 and 2017, with support from the U.S. Department of Homeland Security (DHS), Brookhaven National Laboratory (BNL) examined the International Atomic Energy Agency (IAEA) radiological emergency response and preparedness products (guidance and tools) to determine which of these products could be useful to U.S. first responders. The IAEA Incident and Emergency Centre (IEC), which is responsible for emergency preparedness and response, offers a range of tools and guidance documents for responders in recognizing, responding to, and recovering from radiation emergencies and incidents. In order to implement this project, BNL obtained all potentially relevant tools and productsmore » produced by the IAEA IEC and analyzed these materials to determine their relevance to first responders in the U.S. Subsequently, BNL organized and hosted a workshop at DHS National Urban Security Technology Laboratory (NUSTL) for U.S. first responders to examine and evaluate IAEA products to consider their applicability to the United States. This report documents and describes the First Responder Product Evaluation Workshop, and provides recommendations on potential steps the U.S. federal government could take to make IAEA guidance and tools useful to U.S. responders.« less

  10. 48 CFR 242.7001 - Contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... solicitations and contracts (other than in contracts with educational institutions, Federally Funded Research and Development Centers (FFRDCs), or University Associated Research Centers (UARCs) operated by...

  11. 48 CFR 242.7001 - Contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... solicitations and contracts (other than in contracts with educational institutions, Federally Funded Research and Development Centers (FFRDCs), or University Associated Research Centers (UARCs) operated by...

  12. 48 CFR 242.7001 - Contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... solicitations and contracts (other than in contracts with educational institutions, Federally Funded Research and Development Centers (FFRDCs), or University Associated Research Centers (UARCs) operated by...

  13. RELAP5 posttest calculation of IAEA-SPE-4

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Petelin, S.; Mavko, B.; Parzer, I.

    The International Atomic Energy Agency`s Fourth Standard Problem Exercise (IAEA-SPE-4) was performed at the PMK-2 facility. The PMK-2 facility is designed to study processes following small- and medium-size breaks in the primary system and natural circulation in VVER-440 plants. The IAEA-SPE-4 experiment represents a cold-leg side small break, similar to the IAEA-SPE-2, with the exception of the high-pressure safety injection being unavailable, and the secondary side bleed and feed initiation. The break valve was located at the dead end of a vertical downcomer, which in fact simulates a break in the reactor vessel itself, and should be unlikely to happenmore » in a real nuclear power plant (NPP). Three different RELAP5 code versions were used for the transient simulation in order to assess the calculations with test results.« less

  14. 48 CFR 43.205 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-engineer or other professional services, and no supplies are to be furnished, the contracting officer shall...-engineer or other professional services, the contracting officer shall use the clause with its Alternate... Accounting, in solicitations and contracts for supply and research and development contracts of significant...

  15. 48 CFR 43.205 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-engineer or other professional services, and no supplies are to be furnished, the contracting officer shall...-engineer or other professional services, the contracting officer shall use the clause with its Alternate... Accounting, in solicitations and contracts for supply and research and development contracts of significant...

  16. 48 CFR 43.205 - Contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...-engineer or other professional services, and no supplies are to be furnished, the contracting officer shall...-engineer or other professional services, the contracting officer shall use the clause with its Alternate... Accounting, in solicitations and contracts for supply and research and development contracts of significant...

  17. 48 CFR 43.205 - Contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...-engineer or other professional services, and no supplies are to be furnished, the contracting officer shall...-engineer or other professional services, the contracting officer shall use the clause with its Alternate... Accounting, in solicitations and contracts for supply and research and development contracts of significant...

  18. 48 CFR 43.205 - Contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...-engineer or other professional services, and no supplies are to be furnished, the contracting officer shall...-engineer or other professional services, the contracting officer shall use the clause with its Alternate... Accounting, in solicitations and contracts for supply and research and development contracts of significant...

  19. Static Verification for Code Contracts

    NASA Astrophysics Data System (ADS)

    Fähndrich, Manuel

    The Code Contracts project [3] at Microsoft Research enables programmers on the .NET platform to author specifications in existing languages such as C# and VisualBasic. To take advantage of these specifications, we provide tools for documentation generation, runtime contract checking, and static contract verification.

  20. Implementation of k0-INAA standardisation at ITU TRIGA Mark II research reactor, Turkey based on k0-IAEA software

    NASA Astrophysics Data System (ADS)

    Esen, Ayse Nur; Haciyakupoglu, Sevilay

    2016-02-01

    The purpose of this study is to test the applicability of k0-INAA method at the Istanbul Technical University TRIGA Mark II research reactor. The neutron spectrum parameters such as epithermal neutron flux distribution parameter (α), thermal to epithermal neutron flux ratio (f) and thermal neutron flux (φth) were determined at the central irradiation channel of the ITU TRIGA Mark II research reactor using bare triple-monitor method. HPGe detector calibrations and calculations were carried out by k0-IAEA software. The α, f and φth values were calculated to be -0.009, 15.4 and 7.92·1012 cm-2 s-1, respectively. NIST SRM 1633b coal fly ash and intercomparison samples consisting of clay and sandy soil samples were used to evaluate the validity of the method. For selected elements, the statistical evaluation of the analysis results was carried out by z-score test. A good agreement between certified/reported and experimental values was obtained.

  1. The Value of Competitive Contracting

    DTIC Science & Technology

    2014-09-01

    Research & Engineering) BBP Better Buying Power BOA basic ordering agreement BPA basic purchase agreement CAE Component Acquisition Executive CDSA...competitive procedures for the following contract actions:” a. Contract and purchase orders b. Orders and calls under part 13 Basic Purchase Agreement ( BPA ...Basic Ordering Agreement (BOA) c. Government wide acquisition contracts and IDIQ contracts d. BPAs and BPA calls under Federal Supply Schedules

  2. 10 CFR 150.17a - Compliance with requirements of US/IAEA Safeguards Agreement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Compliance with requirements of US/IAEA Safeguards... Authority in Agreement States § 150.17a Compliance with requirements of US/IAEA Safeguards Agreement. (a... shall take other action as may be necessary to implement the US/IAEA Safeguards Agreement, as described...

  3. 10 CFR 150.17a - Compliance with requirements of US/IAEA Safeguards Agreement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Compliance with requirements of US/IAEA Safeguards... Authority in Agreement States § 150.17a Compliance with requirements of US/IAEA Safeguards Agreement. (a... shall take other action as may be necessary to implement the US/IAEA Safeguards Agreement, as described...

  4. 48 CFR 16.103 - Negotiating contract type.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Selecting Contract Types 16.103 Negotiating contract... basic profit motive of business enterprise, shall be used when the risk involved is minimal or can be...) Contracts on a firm fixed-price basis other than those for major systems or research and development, and (3...

  5. 48 CFR 45.107 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Alternate II when a contract for the conduct of basic or applied research at nonprofit institutions of... research (see 35.014) is contemplated. (b) The contracting officer shall also insert the clause at 52.245-2...

  6. Four Years of Practical Arrangements between IAEA and Moscow SIA 'Radon': Preliminary Results - 13061

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Batyukhnova, O.G.; Karlina, O.K.; Neveikin, P.P.

    The International Education Training Centre (IETC) at Moscow State Unitary Enterprise Scientific and Industrial Association 'Radon' (SIA 'Radon'), in co-operation with the International Atomic Energy Agency (IAEA), has developed expertise and provided training to waste management personnel for the last 15 years. Since 1997, the educational system of the enterprise with the support of the IAEA has acquired an international character: more than 470 experts from 35 countries- IAEA Member States completed the professional development. Training is conducted at various thematic courses or fellowships for individual programs and seminars on IAEA technical projects. In June 2008 a direct agreement (Practicalmore » Arrangements) was signed between SIA 'Radon' and the IAEA on cooperation in the field of development of new technologies, expert's advice to IAEA Member States, and, in particular, the training of personnel in the field of radioactive waste management (RWM), which opens up new perspectives for fruitful cooperation of industry professionals. The paper summarizes the current experience of the SIA 'Radon' in the organization and implementation of the IAEA sponsored training and others events and outlines some of strategic educational elements, which IETC will continue to pursue in the coming years. (authors)« less

  7. Strengthening radiopharmacy practice in IAEA Member States.

    PubMed

    Duatti, Adriano; Bhonsle, Uday

    2013-05-01

    Radiopharmaceuticals are essential components of nuclear medicine procedures. Without radiopharmaceuticals nuclear medicine procedures cannot be performed. Therefore it could be said that 'No radiopharmaceutical-no nuclear medicine.' A good radiopharmacy practice supports nuclear medicine activities by producing radiopharmaceuticals that are safe and are of the required quality in a consistent way. As with any medicinal product, radiopharmaceuticals are required to be produced under carefully controlled conditions and are tested for their quality, prior to the administration to patients, using validated standard operating procedures. These procedures are based on the principles of Good Manufacturing Practice (GMP). The GMP principles are based on scientific knowledge and applicable regulatory requirements and guidance related to radiopharmaceutical productions and use. The International Atomic Energy Agency (IAEA) is committed to promote, in the Member States (MS), a rational and practical approach for the implementation of GMP for compounding or manufacturing of diagnostic or therapeutic radiopharmaceuticals. To pursue this goal the IAEA has developed various mechanisms and collaborations with individual experts in the field and with relevant national and international institutions or organizations. IAEA's activities in promoting radiopharmaceutical science include commissioning expert advice in the form of publications on radiopharmaceutical production, quality control and usage, producing technical guidance on production and regulatory aspects related to new radiopharmaceuticals, creating guidance documentation for self or internal audits of radiopharmaceutical production facilities, producing guidance on implementation of Quality Management System and GMP in radiopharmacy, assisting in creation of specific radiopharmaceutical monographs for the International Pharmacopoeia, and developing radiopharmacy-related human resource capabilities in MS through individual

  8. Contracts for field projects and supporting research on enhanced oil recovery. Progress review number 83, quarter ending June 30, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    Summaries of 41 research projects on enhanced recovery are presented under the following sections: (1) chemical flooding; (2) gas displacement; (3) thermal recovery; (4) geoscience technology; (5) resource assessment technology; and (6) reservoir classes. Each presentation gives the title of the project, contract number, research facility, contract date, expected completion data, amount of the award, principal investigator, and DOE program manager, and describes the objectives of the project and a summary of the technical progress.

  9. Notification: Preliminary Research on the U.S. Chemical Safety and Hazard Investigation Board's Management of Contracts

    EPA Pesticide Factsheets

    June 3, 2013. The U.S. Environmental Protection Agency’s Office of Inspector General plans to begin preliminary research on the U.S. Chemical Safety and Hazard Investigation Board’s management of contracts.

  10. Fault displacement hazard assessment for nuclear installations based on IAEA safety standards

    NASA Astrophysics Data System (ADS)

    Fukushima, Y.

    2016-12-01

    In the IAEA Safety NS-R-3, surface fault displacement hazard assessment (FDHA) is required for the siting of nuclear installations. If any capable faults exist in the candidate site, IAEA recommends the consideration of alternative sites. However, due to the progress in palaeoseismological investigations, capable faults may be found in existing site. In such a case, IAEA recommends to evaluate the safety using probabilistic FDHA (PFDHA), which is an empirical approach based on still quite limited database. Therefore a basic and crucial improvement is to increase the database. In 2015, IAEA produced a TecDoc-1767 on Palaeoseismology as a reference for the identification of capable faults. Another IAEA Safety Report 85 on ground motion simulation based on fault rupture modelling provides an annex introducing recent PFDHAs and fault displacement simulation methodologies. The IAEA expanded the project of FDHA for the probabilistic approach and the physics based fault rupture modelling. The first approach needs a refinement of the empirical methods by building a world wide database, and the second approach needs to shift from kinematic to the dynamic scheme. Both approaches can complement each other, since simulated displacement can fill the gap of a sparse database and geological observations can be useful to calibrate the simulations. The IAEA already supported a workshop in October 2015 to discuss the existing databases with the aim of creating a common worldwide database. A consensus of a unified database was reached. The next milestone is to fill the database with as many fault rupture data sets as possible. Another IAEA work group had a WS in November 2015 to discuss the state-of-the-art PFDHA as well as simulation methodologies. Two groups jointed a consultancy meeting in February 2016, shared information, identified issues, discussed goals and outputs, and scheduled future meetings. Now we may aim at coordinating activities for the whole FDHA tasks jointly.

  11. Tale of a Performance Contract

    ERIC Educational Resources Information Center

    Berson, Minnie Perrin

    1971-01-01

    Excerpts from Texarkana and Gary: A Tale of Two Performance Contracts," Childhood Education Magazine, March 1971; reports on observations made during visit to Gary, Indiana, school under contract to Behavioral Research Laboratories. (RT)

  12. 48 CFR 1535.007-70 - Contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Contract clauses. 1535.007-70 Section 1535.007-70 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 1535.007-70 Contract clauses. The following...

  13. 48 CFR 1535.007-70 - Contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Contract clauses. 1535.007-70 Section 1535.007-70 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 1535.007-70 Contract clauses. The following...

  14. 48 CFR 1535.007-70 - Contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false Contract clauses. 1535.007-70 Section 1535.007-70 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 1535.007-70 Contract clauses. The following...

  15. 48 CFR 1535.007-70 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Contract clauses. 1535.007-70 Section 1535.007-70 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 1535.007-70 Contract clauses. The following...

  16. 48 CFR 235.072 - Additional contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... contracts for research and development. (d) Use the clause at 252.235-7011, Final Scientific or Technical Report, in solicitations and contracts for research and development. (e) Use the clause at 252.235-7004...

  17. 10 CFR 733.8 - Contracting officer procedures.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... DEPARTMENT OF ENERGY ALLEGATIONS OF RESEARCH MISCONDUCT § 733.8 Contracting officer procedures. Upon receipt of an allegation of research misconduct by referral under § 733.7, the contracting officer should, by... assistance recipient to act on the allegation consistent with the Research Misconduct requirements in the...

  18. 10 CFR 733.8 - Contracting officer procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... DEPARTMENT OF ENERGY ALLEGATIONS OF RESEARCH MISCONDUCT § 733.8 Contracting officer procedures. Upon receipt of an allegation of research misconduct by referral under § 733.7, the contracting officer should, by... assistance recipient to act on the allegation consistent with the Research Misconduct requirements in the...

  19. 10 CFR 733.8 - Contracting officer procedures.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... DEPARTMENT OF ENERGY ALLEGATIONS OF RESEARCH MISCONDUCT § 733.8 Contracting officer procedures. Upon receipt of an allegation of research misconduct by referral under § 733.7, the contracting officer should, by... assistance recipient to act on the allegation consistent with the Research Misconduct requirements in the...

  20. 10 CFR 733.8 - Contracting officer procedures.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... DEPARTMENT OF ENERGY ALLEGATIONS OF RESEARCH MISCONDUCT § 733.8 Contracting officer procedures. Upon receipt of an allegation of research misconduct by referral under § 733.7, the contracting officer should, by... assistance recipient to act on the allegation consistent with the Research Misconduct requirements in the...

  1. 10 CFR 733.8 - Contracting officer procedures.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... DEPARTMENT OF ENERGY ALLEGATIONS OF RESEARCH MISCONDUCT § 733.8 Contracting officer procedures. Upon receipt of an allegation of research misconduct by referral under § 733.7, the contracting officer should, by... assistance recipient to act on the allegation consistent with the Research Misconduct requirements in the...

  2. 48 CFR 235.072 - Additional contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Additional contract clauses. 235.072 Section 235.072 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 235.072 Additional contract clauses. (a) Use the...

  3. 48 CFR 235.072 - Additional contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Additional contract clauses. 235.072 Section 235.072 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE SPECIAL CATEGORIES OF CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 235.072 Additional contract clauses. (a) Use the...

  4. Federal Research and Development Contract Trends and the Supporting Industrial Base, 2000-2014

    DTIC Science & Technology

    2016-04-30

    Homeland Security, and government-wide services contracting trends; sourcing policy and cost estimation methodologies; and recent U.S. Army modernization ...been fears that the sharp downturn in federal contract obligations would disproportionately impact the R&D contracting portfolios within individual...329 - contracting portfolios , and the industrial base that supports those efforts, within each R&D contracting agency. The main finding of this

  5. Training activities at FSUE 'RADON' and Lomonosov's Moscow state university under practical arrangements with IAEA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Batyukhnova, O.G.; Karlina, O.K.; Neveykin, P.P.

    The International Education Training Centre (IETC) at Moscow Federal State Unitary Enterprise (FSUE) 'Radon', in co-operation with the International Atomic Energy Agency (IAEA), has developed expertise and provided training to waste management personnel for the last 15 years. Since 1997, the educational system of the enterprise with the support of the IAEA has acquired an international character: more than 470 experts from 35 countries - IAEA Member States completed the professional development. Training is conducted at various thematic courses or fellowships for individual programs and seminars on IAEA technical projects. In June 2008 a direct agreement (Practical Arrangements) has beenmore » signed between FSUE 'Radon' and the IAEA on cooperation in the field of development of new technologies, expert's advice to IAEA Member States, and, in particular, the training of personnel in the field of radioactive waste management (RWM), which opens up new perspectives for fruitful cooperation of industry professionals. A similar agreement - Practical Arrangements - has been signed between Lomonosov's MSU and the IAEA in 2012. In October 2012 a new IAEA two-weeks training course started at Lomonosov's MSU and FSUE 'Radon' in the framework of the Practical Agreements signed. Pre-disposal management of waste was the main topic of the courses. The paper summarizes the current experience of the FSUE 'Radon' in the organization and implementation of the IAEA sponsored training and others events and outlines some of strategic educational elements, which IETC will continue to pursue in the coming years. (authors)« less

  6. 48 CFR 45.107 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Alternate II when a contract for the conduct of basic or applied research at nonprofit institutions of higher education or at nonprofit organizations whose primary purpose is the conduct of scientific research (see 35.014) is contemplated. (b) The contracting officer shall also insert the clause at 52.245-2...

  7. Contract Research Organizations (CROs) in China: integrating Chinese research and development capabilities for global drug innovation.

    PubMed

    Shi, Yun-Zhen; Hu, Hao; Wang, Chunming

    2014-11-19

    The significance of R&D capabilities of China has become increasingly important as an emerging force in the context of globalization of pharmaceutical research and development (R&D). While China has prospered in its R&D capability in the past decade, how to integrate the rising pharmaceutical R&D capability of China into the global development chain for innovative drugs remains challenging. For many multinational corporations and research organizations overseas, their attempt to integrate China's pharmaceutical R&D capabilities into their own is always hindered by policy constraints and reluctance of local universities and pharmaceutical firms. In light of the situation, contract research organizations (CROs) in China have made great innovation in value proposition, value chain and value networking to be at a unique position to facilitate global and local R&D integration. Chinese CROs are now being considered as the essentially important and highly versatile integrator of local R&D capability for global drug discovery and innovation.

  8. New Perils for the Contract Ethnographer.

    ERIC Educational Resources Information Center

    Fetterman, David M.

    1981-01-01

    Conditions of contract research may lead some workers to ignore publication rights of colleagues whose reports are of limited circulation. The author presents a case example of how this process occurred with the use of his own work and argues for rigorous ethical standards in the publication of contract research results. (Author/GC)

  9. Assessment of Navy Contract Management Processes

    DTIC Science & Technology

    2016-02-22

    Assessment of Navy Contract Management Processes 22 February 2016 Dr. Rene G. Rendon, Associate Professor Graduate School of Business ...Know) for each survey item in each contract management process area. Acquisition Research Program Graduate School of Business ...management process . Figure 1. U.S. Navy CMMM Maturity Levels Acquisition Research Program Graduate School of Business

  10. IAEA programs in empowering the nuclear medicine profession through online educational resources.

    PubMed

    Pascual, Thomas Nb; Dondi, Maurizio; Paez, Diana; Kashyap, Ravi; Nunez-Miller, Rodolfo

    2013-05-01

    The International Atomic Energy Agency's (IAEA) programme in human health aims to enhance the capabilities in Member States to address needs related to the prevention, diagnosis, and treatment of diseases through the application of nuclear techniques. It has the specific mission of fostering the application of nuclear medicine techniques as part of the clinical management of certain types of diseases. Attuned to the continuous evolution of this specialty as well as to the advancement and diversity of methods in delivering capacity building efforts in this digital age, the section of nuclear medicine of the IAEA has enhanced its program by incorporating online educational resources for nuclear medicine professionals into its repertoire of projects to further its commitment in addressing the needs of its Member States in the field of nuclear medicine. Through online educational resources such as the Human Health Campus website, e-learning modules, and scheduled interactive webinars, a validation of the commitment by the IAEA in addressing the needs of its Member States in the field of nuclear medicine is strengthened while utilizing the advanced internet and communications technology which is progressively becoming available worldwide. The Human Health Campus (www.humanhealth.iaea.org) is the online educational resources initiative of the Division of Human Health of the IAEA geared toward enhancing professional knowledge of health professionals in radiation medicine (nuclear medicine and diagnostic imaging, radiation oncology, and medical radiation physics), and nutrition. E-learning modules provide an interactive learning environment to its users while providing immediate feedback for each task accomplished. Webinars, unlike webcasts, offer the opportunity of enhanced interaction with the learners facilitated through slide shows where the presenter guides and engages the audience using video and live streaming. This paper explores the IAEA's available online

  11. 48 CFR 2442.1107 - Contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... requires services of an analytical nature (e.g., applied social science research); and (3) The contract requires the delivery of an overall end product (e.g., evaluation, study, model). (b) The Contracting...

  12. 48 CFR 2442.1107 - Contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... requires services of an analytical nature (e.g., applied social science research); and (3) The contract requires the delivery of an overall end product (e.g., evaluation, study, model). (b) The Contracting...

  13. Uninvolved versus target muscle contraction during contract: relax proprioceptive neuromuscular facilitation stretching.

    PubMed

    Azevedo, Daniel Camara; Melo, Raphael Marques; Alves Corrêa, Ricardo Vidal; Chalmers, Gordon

    2011-08-01

    The purpose of this study was to compare the acute effect of the contract-relax (CR) stretching technique on knee active range of motion (ROM) using target muscle contraction or an uninvolved muscle contraction. pre-test post-test control experimental design. Clinical research laboratory. Sixty healthy men were randomly assigned to one of three groups. The Contract-Relax group (CR) performed a traditional hamstring CR stretch, the Modified Contract-Relax group (MCR) performed hamstring CR stretching using contraction of an uninvolved muscle distant from the target muscle, and the Control group (CG) did not stretch. Active knee extension test was performed before and after the stretching procedure. Two-way between-within analysis of variance (ANOVA) results showed a significant interaction between group and pre-test to post-test (p < 0.001). Post-hoc examination of individual groups showed no significant change in ROM for the CG (0.8°, p = 0.084), and a significant moderate increase in ROM for both the CR (7.0°, p < 0.001) and MCR (7.0°, p < 0.001) groups. ROM gain following a CR PNF procedure is the same whether the target stretching muscle is contracted, or an uninvolved muscle is contracted. Copyright © 2011 Elsevier Ltd. All rights reserved.

  14. Professor Glyn O. Phillip's legacy within the IAEA programme on radiation and tissue banking.

    PubMed

    Morales Pedraza, Jorge

    2017-08-19

    Professor Phillips began his involvement in the implementation of this important IAEA programme, insisting that there were advantages to be gained by using the ionizing radiation technique to sterilize human and animal tissues, based on the IAEA experience gained in the sterilization of medical products. The outcome of the implementation of the IAEA programme on radiation and tissue banking demonstrated that Professor Phillips was right in his opinion.

  15. Reducing the risks from radon indoors: an IAEA perspective.

    PubMed

    Boal, T; Colgan, P A

    2014-07-01

    The IAEA has a mandate to develop, in collaboration with other relevant international organisations, 'standards of safety for protection of health and minimisation of danger to life and property', and to provide for the application of these standards. The most recent edition of the International Basic Safety Standards includes, for the first time, requirements to protect the public from exposure due to radon indoors. As a result, the IAEA has already developed guidance material in line with accepted best international practice and an international programme to assist its Member States in identifying and addressing high radon concentrations in buildings is being prepared. This paper overviews the current situation around the world and summarises the management approach advocated by the IAEA. A number of important scientific and policy issues are identified and discussed from the point-of-view of how they may impact on national action plans and strategies. Finally, the assistance and support available through the Agency is described. © The Author 2014. Published by Oxford University Press. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  16. 48 CFR 2442.1107 - Contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... analytical nature (e.g., applied social science research); and (3) The contract requires the delivery of an overall end product (e.g., evaluation, study, model). (b) The Contracting Officer shall use the basic...

  17. 48 CFR 2442.1107 - Contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... analytical nature (e.g., applied social science research); and (3) The contract requires the delivery of an overall end product (e.g., evaluation, study, model). (b) The Contracting Officer shall use the basic...

  18. 48 CFR 2442.1107 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... analytical nature (e.g., applied social science research); and (3) The contract requires the delivery of an overall end product (e.g., evaluation, study, model). (b) The Contracting Officer shall use the basic...

  19. Assessment of Alternative Funding Mechanisms for the IAEA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Toomey, Christopher; Wyse, Evan T.; Kurzrok, Andrew J.

    While the International Atomic Energy Agency (IAEA) has enjoyed substantial success and prestige in the international community, there is growing concern that global demographic trends, advances in technology and the trend towards austerity in Member State budgets will stretch the Agency’s resources to a point where it may no longer be possible to execute its multifaceted mission in its entirety. As part of an ongoing effort by the Next Generation Safeguards Initiative to evaluate the IAEA’s long-term budgetary concerns , this paper proposes a series of alternate funding mechanisms that have the potential to sustain the IAEA in the long-term,more » including endowment, charity, and fee-for-service funding models.« less

  20. Funding for the 2ND IAEA technical meeting on fusion data processing, validation and analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Greenwald, Martin

    The International Atomic Energy Agency (IAEA) will organize the second Technical Meeting on Fusion Da Processing, Validation and Analysis from 30 May to 02 June, 2017, in Cambridge, MA USA. The meeting w be hosted by the MIT Plasma Science and Fusion Center (PSFC). The objective of the meeting is to provide a platform where a set of topics relevant to fusion data processing, validation and analysis are discussed with the view of extrapolation needs to next step fusion devices such as ITER. The validation and analysis of experimental data obtained from diagnostics used to characterize fusion plasmas are crucialmore » for a knowledge based understanding of the physical processes governing the dynamics of these plasmas. The meeting will aim at fostering, in particular, discussions of research and development results that set out or underline trends observed in the current major fusion confinement devices. General information on the IAEA, including its mission and organization, can be found at the IAEA websit Uncertainty quantification (UQ) Model selection, validation, and verification (V&V) Probability theory and statistical analysis Inverse problems & equilibrium reconstru ction Integrated data analysis Real time data analysis Machine learning Signal/image proc essing & pattern recognition Experimental design and synthetic diagnostics Data management« less

  1. Research Interactions between Industry and Higher-Education: An Examination of the Major Legal Issues Involved in Four Representative Contracts.

    ERIC Educational Resources Information Center

    Reams, Bernard Dinsmore

    The use of complex research agreements for joint research activities between industry and universities is assessed, with attention to the legal rights of the contracting parties. The focus is research relationships between a university and a company or an individual scientist and industry. The historical development and legal foundation of…

  2. Industry-contract research organization pathology interactions: a perspective of contract research organizations in producing the best quality pathology report.

    PubMed

    Gosselin, Sylvie J; Palate, Bernard; Parker, George A; Engelhardt, Jeffery A; Hardisty, Jerry F; McDorman, Kevin S; Tellier, Pierre A; Silverman, Lee R

    2011-02-01

    This article provides observations on the features of sponsor-contract research organization communication that will achieve the best quality pathology report based on our collective experience. Information on the test article and any anticipated findings should be provided, and initial slide examination should be done with knowledge of treatment group (but may be followed by blinded review of target tissues to determine no-effect levels). Only a pathologist should write or revise the pathology report or the pathology section of the overall study report. To address concerns related to undue sponsor influence, comments by sponsors should be presented as suggestions rather than directives. Adversity should be defined for each finding by the study pathologist, but the no-observed adverse effect level should not be discussed in the pathology report. Board-certified pathologists are recommended, but are not essential. Sponsors that have a particular format or report preferences should make them known well in advance. Histologic processing "to glass" of protocol-specified tissues from all dosage groups is recommended for rapid evaluation of target tissues. Telepathology is beneficial in certain situations, but it is usually more efficient for the study pathologist and reviewing pathologist to be in the same physical location to review differences of opinion and reach a consensus.

  3. [Excitation-contraction coupling in skeletal muscle: questions remaining after 50 years of research].

    PubMed

    Calderón-Vélez, Juan Camilo; Figueroa-Gordon, Lourdes Carolina

    2009-03-01

    The excitation-contraction coupling mechanism was defined as the entire sequence of reactions linking excitation of plasma membrane to activation of contraction in skeletal muscle. By using different techniques, their regulation and interactions have been studied during the last 50 years, defining until now the importance and origin of the calcium ion as a contractile activator and the main proteins involved in the whole mechanism. Furthermore, the study of the ultrastructural basis and pharmacological regulation of the excitation-contraction coupling phenomenon has begun. The excitation-contraction coupling is thought to be altered in situations as ageing, muscle fatigue and some muscle diseases. However, many questions remain to be answered. For example, (1) How excitation-contraction coupling develops and ages? (2) What role does it play in muscle fatigue and other diseases? (3) What is the nature of the interaction between the proteins believed to be involved? The present review describes excitation-contraction coupling in skeletal muscle and techniques used to better understand it as an introduction for discussing unanswered questions regarding excitation-contraction coupling.

  4. Establishing guidelines for incentive/disincentive contracting at ODOT.

    DOT National Transportation Integrated Search

    2007-02-01

    This report describes the results of a research project which explored the use of Incentive / Disincentive (I/D) contracting at : the Oregon Department of Transportation (ODOT). The research found that I/D contracting is a relatively rare practice : ...

  5. Campaign contributions, lobbying and post-Katrina contracts.

    PubMed

    Hogan, Michael J; Long, Michael A; Stretesky, Paul B

    2010-07-01

    This research explores the relationship between political campaign contributions, lobbying and post-Hurricane Katrina cleanup and reconstruction contracts. Specifically, a case-control study design is used to determine whether campaign contributions to national candidates in the 2000-04 election cycles and/or the employment of lobbyists and lobbying firms increased a company's probability of receiving a post-hurricane contract. Results indicate that both a campaign contribution dichotomous variable and the dollar amount of contributions are significantly related to whether a company received a contract, but that lobbying activity was not. These findings are discussed in the context of previous research on the politics of natural disasters, government contracting and governmental and corporate deviance.

  6. A meta-analysis of single-case research on behavior contracts: effects on behavioral and academic outcomes among children and youth.

    PubMed

    Bowman-Perrott, Lisa; Burke, Mack D; de Marin, Sharon; Zhang, Nan; Davis, Heather

    2015-03-01

    The purpose of this meta-analysis was to quantitatively summarize the single-case research (SCR) literature on the use of behavior contracts with children and youth. This study examined the efficacy of behavior contracts on problem behaviors and academic behaviors across 18 SCR studies. Academic and behavioral outcomes were examined for 58 children and youth ages 5 to 21 using the TauU effect size index. Results indicated the overall moderate effect of the use of behavior contracts was ES = .57 (95% confidence interval [CI95] = [0.55, 0.58]) with a range of effects across studies (ES = .27 to ES = 1.00). Moderator analyses indicated that behavior contracts are beneficial for students regardless of grade level, gender, or disability status. Findings suggest that the intervention is more effective in reducing inappropriate behaviors than increasing appropriate behaviors, and that academic outcomes are positively affected by behavior contracting. © The Author(s) 2014.

  7. Electrically stimulated contractions of Vorticella convallaria

    NASA Astrophysics Data System (ADS)

    Kantha, Deependra; van Winkle, David

    2009-03-01

    The contraction of Vorticella convallaria was triggered by applying a voltage pulse in its host culturing medium. The 50V, 1ms wide pulse was applied across platinum wires separated by 0.7 cm on a microscope slide. The contractions were recorded as cines (image sequences) by a Phantom V5 camera (Vision Research) on a bright field microscope with 20X objective, with the image size of 256 pixels x 128 pixels at 7352 pictures per second. The starting time of the cines was synchronized with the starting of the electrical pulse. We recorded five contractions of each of 12 organisms. The cines were analyzed to obtain the initiation time, defined as the difference in time between the leading edge of the electrical pulse and the first frame showing zooid movement. From multiple contractions of same organism, we found the initiation time is reproducible. In comparing different organisms, we found the average initiation time of 1.73 ms with a standard deviation of 0.63 ms. This research is supported by the state of Florida (MARTECH) and Research Corporation.

  8. 32 CFR 736.2 - Dispositions under contracts.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... contract terms and conditions. (c) Transfer to nonprofit education or research institutions of title to equipment purchased with funds available for grants or contracts for the conduct of basic or applied research is authorized by the act of September 6, 1958 (sec. 2, 72 Stat. 1793; 42 U.S.C. 1892) and...

  9. TU-AB-BRC-07: Efficiency of An IAEA Phase-Space Source for a Low Energy X-Ray Tube Using Egs++

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Watson, PGF; Renaud, MA; Seuntjens, J

    Purpose: To extend the capability of the EGSnrc C++ class library (egs++) to write and read IAEA phase-space files as a particle source, and to assess the relative efficiency gain in dose calculation using an IAEA phase-space source for modelling a miniature low energy x-ray source. Methods: We created a new ausgab object to score particles exiting a user-defined geometry and write them to an IAEA phase-space file. A new particle source was created to read from IAEA phase-space data. With these tools, a phase-space file was generated for particles exiting a miniature 50 kVp x-ray tube (The INTRABEAM System,more » Carl Zeiss). The phase-space source was validated by comparing calculated PDDs with a full electron source simulation of the INTRABEAM. The dose calculation efficiency gain of the phase-space source was determined relative to the full simulation. The efficiency gain as a function of i) depth in water, and ii) job parallelization was investigated. Results: The phase-space and electron source PDDs were found to agree to 0.5% RMS, comparable to statistical uncertainties. The use of a phase-space source for the INTRABEAM led to a relative efficiency gain of greater than 20 over the full electron source simulation, with an increase of up to a factor of 196. The efficiency gain was found to decrease with depth in water, due to the influence of scattering. Job parallelization (across 2 to 256 cores) was not found to have any detrimental effect on efficiency gain. Conclusion: A set of tools has been developed for writing and reading IAEA phase-space files, which can be used with any egs++ user code. For simulation of a low energy x-ray tube, the use of a phase-space source was found to increase the relative dose calculation efficiency by factor of up to 196. The authors acknowledge partial support by the CREATE Medical Physics Research Training Network grant of the Natural Sciences and Engineering Research Council (Grant No. 432290).« less

  10. Contract Audit Followup: Its Impact on Defense Contracting.

    DTIC Science & Technology

    1983-12-01

    NOTES Contract Auditor Disposition of Contract Audit Reports Contracting Officer Independent Role of Contracting Officer Contract Audit Report Overaged...fundamental shift in the relationship between the contracting officer and contract auditor , strengthening the auditor’s role while eroding the...the indepen- .1 ident role of the contracting officer; (2) attracts unneces- sary attention to the contracting officer/ auditor relationship; (3) imposes

  11. 48 CFR 16.504 - Indefinite-quantity contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... quantity based on market research, trends on recent contracts for similar supplies or services, survey of... are unique or highly specialized; (2) Based on the contracting officer's knowledge of the market, more...

  12. TH-EF-204-02: Small Field Radiation Therapy: Physics and Recent Recommendations From IAEA and ICRU

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Seuntjens, J.

    Joanna E. Cygler, Jan Seuntjens, J. Daniel Bourland, M. Saiful Huq, Josep Puxeu Vaque, Daniel Zucca Aparicio, Tatiana Krylova, Yuri Kirpichev, Eric Ford, Caridad Borras Stereotactic Radiation Therapy (SRT) utilizes small static and dynamic (IMRT) fields, to successfully treat malignant and benign diseases using techniques such as Stereotactic Radiosurgery (SRS) and Stereotactic Body Radiation Therapy (SBRT). SRT is characterized by sharp dose gradients for individual fields and their resultant dose distributions. For appropriate targets, small field radiotherapy offers improved treatment quality by allowing better sparing of organs at risk while delivering the prescribed target dose. Specialized small field treatment deliverymore » systems, such as robotic-controlled linear accelerators, gamma radiosurgery units, and dynamic arc linear accelerators may utilize rigid fixation, image guidance, and tumor tracking, to insure precise dose delivery to static or moving targets. However, in addition to great advantages, small field delivery techniques present special technical challenges for dose calibration due to unique geometries and small field sizes not covered by existing reference dosimetry protocols such as AAPM TG-51 or IAEA TRS 398. In recent years extensive research has been performed to understand small field dosimetry and measurement instrumentation. AAPM, IAEA and ICRU task groups are expected to provide soon recommendations on the dosimetry of small radiation fields. In this symposium we will: 1] discuss the physics, instrumentation, methodologies and challenges for small field radiation dose measurements; 2] review IAEA and ICRU recommendations on prescribing, recording and reporting of small field radiation therapy; 3] discuss selected clinical applications and technical aspects for specialized image-guided, small field, linear accelerator based treatment techniques such as IMRT and SBRT. Learning Objectives: To learn the physics of small fields in

  13. The IAEA neutron coincidence counting (INCC) and the DEMING least-squares fitting programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krick, M.S.; Harker, W.C.; Rinard, P.M.

    1998-12-01

    Two computer programs are described: (1) the INCC (IAEA or International Neutron Coincidence Counting) program and (2) the DEMING curve-fitting program. The INCC program is an IAEA version of the Los Alamos NCC (Neutron Coincidence Counting) code. The DEMING program is an upgrade of earlier Windows{reg_sign} and DOS codes with the same name. The versions described are INCC 3.00 and DEMING 1.11. The INCC and DEMING codes provide inspectors with the software support needed to perform calibration and verification measurements with all of the neutron coincidence counting systems used in IAEA inspections for the nondestructive assay of plutonium and uranium.

  14. 48 CFR 27.303 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...)(1) Insert a patent rights clause in all solicitations and contracts for experimental, developmental... contracts for construction work or architect-engineer services that include— (i) Experimental, developmental, or research work; (ii) Test and evaluation studies; or (iii) The design of a Government facility that...

  15. 48 CFR 27.303 - Contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...)(1) Insert a patent rights clause in all solicitations and contracts for experimental, developmental... contracts for construction work or architect-engineer services that include— (i) Experimental, developmental, or research work; (ii) Test and evaluation studies; or (iii) The design of a Government facility that...

  16. 48 CFR 27.303 - Contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...)(1) Insert a patent rights clause in all solicitations and contracts for experimental, developmental... contracts for construction work or architect-engineer services that include— (i) Experimental, developmental, or research work; (ii) Test and evaluation studies; or (iii) The design of a Government facility that...

  17. 48 CFR 27.303 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...)(1) Insert a patent rights clause in all solicitations and contracts for experimental, developmental... contracts for construction work or architect-engineer services that include— (i) Experimental, developmental, or research work; (ii) Test and evaluation studies; or (iii) The design of a Government facility that...

  18. How Students Manage the Didactic Contract? Contribution of the Didactic Perspective to Research in Physical Education Classroom.

    ERIC Educational Resources Information Center

    Amade-Escot, Chantal

    This study investigated how and why students modified instructional tasks, explaining modifications using the concept of didactic contract. The study focused on two theoretical perspectives in physical education (PE) research: didactic and ecological. The didactic paradigm examines relationships among teachers, students, and the content embedded…

  19. Training of interventional cardiologists in radiation protection--the IAEA's initiatives.

    PubMed

    Rehani, Madan M

    2007-01-08

    The International Atomic Energy Agency (IAEA) has initiated a major international initiative to train interventional cardiologists in radiation protection as a part of its International Action Plan on the radiological protection of patients. A simple programme of two days' training has been developed, covering possible and observed radiation effects among patients and staff, international standards, dose management techniques, examples of good and bad practice and examples indicating prevention of possible injuries as a result of good practice of radiation protection. The training material is freely available on CD from the IAEA. The IAEA has conducted two events in 2004 and 2005 and number of events are planned in 2006. The survey conducted among the cardiologists participating in these programmes indicates that over 80% of them were attending such a structured programme on radiation protection for the first time. As the magnitude of X-ray usage in cardiology grows to match that in interventional radiology, the standards of training on radiation effects, radiation physics and radiation protection in interventional cardiology should also match those in interventional radiology.

  20. Earth resources-regional transfer activity contracts review

    NASA Technical Reports Server (NTRS)

    Bensko, J., Jr.; Daniels, J. L.; Downs, S. W., Jr.; Jones, N. L.; Morton, R. R.; Paludan, C. T.

    1977-01-01

    A regional transfer activity contracts review held by the Earth Resources Office was summarized. Contracts in the earth resources field primarily directed toward applications of satellite data and technology in solution of state and regional problems were reviewed. A summary of the progress of each contract was given in order to share experiences of researchers across a seven state region. The region included Missouri, Kentucky, Tennessee, Mississippi, Alabama, Georgia, and North Carolina. Research in several earth science disciplines included forestry, limnology, water resources, land use, geology, and mathematical modeling. The use of computers for establishment of information retrieval systems was also emphasized.

  1. 48 CFR 212.7002-1 - Contracts under the program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... for Transition to Follow-On Contracting After Use of Other Transaction Authority 212.7002-1 Contracts under the program. (a) The contracting officer may use FAR part 12 procedures to award a contract for an... process begun as a prototype project under an other transaction agreement or as a research project carried...

  2. The U.S./IAEA Workshop on Software Sustainability for Safeguards Instrumentation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pepper S. E.; .; Worrall, L.

    2014-08-08

    The U.S. National Nuclear Security Administration’s Next Generation Safeguards Initiative, the U.S. Department of State, and the International Atomic Energy Agency (IAEA) organized a a workshop on the subject of ”Software Sustainability for Safeguards Instrumentation.” The workshop was held at the Vienna International Centre in Vienna, Austria, May 6-8, 2014. The workshop participants included software and hardware experts from national laboratories, industry, government, and IAEA member states who were specially selected by the workshop organizers based on their experience with software that is developed for the control and operation of safeguards instrumentation. The workshop included presentations, to orient the participantsmore » to the IAEA Department of Safeguards software activities related to instrumentation data collection and processing, and case studies that were designed to inspire discussion of software development, use, maintenance, and upgrades in breakout sessions and to result in recommendations for effective software practices and management. This report summarizes the results of the workshop.« less

  3. 48 CFR 916.405-2 - Cost-plus-award-fee contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., output, be it hardware, research and development, demonstration or services, together with business... CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Incentive Contracts 916.405-2 Cost-plus-award-fee... appropriate) and business management considerations tailored to the needs of the particular situation. In...

  4. 42 CFR 67.103 - Peer review of contract proposals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 67.103 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES FELLOWSHIPS, INTERNSHIPS, TRAINING AGENCY FOR HEALTH CARE POLICY AND RESEARCH GRANTS AND CONTRACTS Peer Review of Contracts for Health Services Research, Evaluation, Demonstration, and Dissemination Projects § 67.103 Peer...

  5. Analysis of historical delta values for IAEA/LANL NDA training courses

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Geist, William; Santi, Peter; Swinhoe, Martyn

    2009-01-01

    The Los Alamos National Laboratory (LANL) supports the International Atomic Energy Agency (IAEA) by providing training for IAEA inspectors in neutron and gamma-ray Nondestructive Assay (NDA) of nuclear material. Since 1980, all new IAEA inspectors attend this two week course at LANL gaining hands-on experience in the application of NDA techniques, procedures and analysis to measure plutonium and uranium nuclear material standards with well known pedigrees. As part of the course the inspectors conduct an inventory verification exercise. This exercise provides inspectors the opportunity to test their abilities in performing verification measurements using the various NDA techniques. For an inspector,more » the verification of an item is nominally based on whether the measured assay value agrees with the declared value to within three times the historical delta value. The historical delta value represents the average difference between measured and declared values from previous measurements taken on similar material with the same measurement technology. If the measurement falls outside a limit of three times the historical delta value, the declaration is not verified. This paper uses measurement data from five years of IAEA courses to calculate a historical delta for five non-destructive assay methods: Gamma-ray Enrichment, Gamma-ray Plutonium Isotopics, Passive Neutron Coincidence Counting, Active Neutron Coincidence Counting and the Neutron Coincidence Collar. These historical deltas provide information as to the precision and accuracy of these measurement techniques under realistic conditions.« less

  6. Teacher Dispositions and Contract Non-Renewal

    ERIC Educational Resources Information Center

    Nixon, Andy; Dam, Margaret; Packard, Abbot

    2010-01-01

    School principals sift through a milieu of data, perceptions, and circumstances to determine which teachers are worthy of contract renewal. This paper provides a review of the research on the role that teacher dispositions play in principals' decision-making regarding contract renewals, as well as a theoretical perspective on the implications for…

  7. INF and IAEA: A comparative analysis of verification strategy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scheinman, L.; Kratzer, M.

    1992-07-01

    This is the final report of a study on the relevance and possible lessons of Intermediate Range Nuclear Force (INF) verification to the International Atomic Energy Agency (IAEA) international safeguards activities.

  8. International Conference on Advances in Radiation Oncology (ICARO): outcomes of an IAEA meeting.

    PubMed

    Salminen, Eeva K; Kiel, Krystyna; Ibbott, Geoffrey S; Joiner, Michael C; Rosenblatt, Eduardo; Zubizarreta, Eduardo; Wondergem, Jan; Meghzifene, Ahmed

    2011-02-04

    The IAEA held the International Conference on Advances in Radiation Oncology (ICARO) in Vienna on 27-29 April 2009. The Conference dealt with the issues and requirements posed by the transition from conventional radiotherapy to advanced modern technologies, including staffing, training, treatment planning and delivery, quality assurance (QA) and the optimal use of available resources. The current role of advanced technologies (defined as 3-dimensional and/or image guided treatment with photons or particles) in current clinical practice and future scenarios were discussed.ICARO was organized by the IAEA at the request of the Member States and co-sponsored and supported by other international organizations to assess advances in technologies in radiation oncology in the face of economic challenges that most countries confront. Participants submitted research contributions, which were reviewed by a scientific committee and presented via 46 lectures and 103 posters. There were 327 participants from 70 Member States as well as participants from industry and government. The ICARO meeting provided an independent forum for the interaction of participants from developed and developing countries on current and developing issues related to radiation oncology.

  9. 75 FR 18034 - Defense Federal Acquisition Regulation Supplement; Research and Development Contract Type...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-08

    ... on DoD program managers and contracting personnel to justify the decision to issue a shipbuilding... reverse order when applied to shipbuilding contracts. DoD Response: For MDAPs, the procedures in DFARS 234...

  10. Product Characteristics, Market Conditions and Contract Type: U.S. Department of Defense Use of Fixed-Price and Cost Reimbursement Contracts

    DTIC Science & Technology

    2015-07-27

    R. (2013). Municipalities’ contracting out decisions: An empirical study on motives. Local Government Studies , 39(3), 414-434. Williamson, O...please contact any of the staff listed on the Acquisition Research Program website (www.acquisitionresearch.net). i Acquisition Research Program...market conditions on the use of fixed-price and cost reimbursement contracts by the Department of Defense. When the product is easy to specify

  11. 10 CFR 733.7 - Referral to the contracting officer.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Referral to the contracting officer. 733.7 Section 733.7 Energy DEPARTMENT OF ENERGY ALLEGATIONS OF RESEARCH MISCONDUCT § 733.7 Referral to the contracting... misconduct, the DOE Element should forward the allegation to the contracting officer responsible for...

  12. 10 CFR 733.7 - Referral to the contracting officer.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Referral to the contracting officer. 733.7 Section 733.7 Energy DEPARTMENT OF ENERGY ALLEGATIONS OF RESEARCH MISCONDUCT § 733.7 Referral to the contracting... misconduct, the DOE Element should forward the allegation to the contracting officer responsible for...

  13. 10 CFR 733.7 - Referral to the contracting officer.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Referral to the contracting officer. 733.7 Section 733.7 Energy DEPARTMENT OF ENERGY ALLEGATIONS OF RESEARCH MISCONDUCT § 733.7 Referral to the contracting... misconduct, the DOE Element should forward the allegation to the contracting officer responsible for...

  14. 10 CFR 733.7 - Referral to the contracting officer.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Referral to the contracting officer. 733.7 Section 733.7 Energy DEPARTMENT OF ENERGY ALLEGATIONS OF RESEARCH MISCONDUCT § 733.7 Referral to the contracting... misconduct, the DOE Element should forward the allegation to the contracting officer responsible for...

  15. 10 CFR 733.7 - Referral to the contracting officer.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Referral to the contracting officer. 733.7 Section 733.7 Energy DEPARTMENT OF ENERGY ALLEGATIONS OF RESEARCH MISCONDUCT § 733.7 Referral to the contracting... misconduct, the DOE Element should forward the allegation to the contracting officer responsible for...

  16. NASA's university program: Active grants and research contracts, fiscal year 1974

    NASA Technical Reports Server (NTRS)

    1974-01-01

    Each entry includes institution and location, brief description of project, period of performance, principal investigator at institution, NASA technical officer (monitor), sponsoring NASA installation, interagency field of science or engineering classification C.A.S.E. category, grant or contract number, FY 74 obligations, cumulative obligations, and most recent RTOP coding. Entries are arranged alphabetically within state or country. Four cross indices are presented: (1) grant or contract number; (2) C.A.S.E. field or science or engineering; (3) NASA technical officer location; and (4) RTOP code.

  17. 48 CFR 9.702 - Contracting with pools.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PLANNING CONTRACTOR QUALIFICATIONS Defense Production Pools and Research and Development Pools 9.702... of a power of attorney identifying the agent authorized to sign the offer or contract on that member's behalf. The contracting officer shall attach a copy of each power of attorney to each signed copy...

  18. The application of the psychological contract to workplace safety.

    PubMed

    Walker, Arlene; Hutton, Dorothy M

    2006-01-01

    Psychological contracts of safety are conceptualized as the beliefs of individuals about reciprocal safety obligations inferred from implicit or explicit promises. Although the literature on psychological contracts is growing, the existence of psychological contracts in relation to safety has not been established. The research sought to identify psychological contracts in the conversations of employees about safety, by demonstrating reciprocity in relation to employer and employee safety obligations. The identified safety obligations were used to develop a measure of psychological contracts of safety. The participants were 131 employees attending safety training sessions in retail and manufacturing organizations. Non-participant observation was used to collect the data during safety training sessions. Content analysis was used to analyze the data. Categories for coding were established through identification of language markers that demonstrated contingencies or other implied obligations. Direct evidence of reciprocity between employer safety obligations and employee safety obligations was found in statements from the participants demonstrating psychological contracts. A comprehensive list of perceived employer and employee safety obligations was compiled and developed into a measure of psychological contracts of safety. A small sample of 33 safety personnel was used to validate the safety obligations. CONCLUSIONS AND IMPACT ON INDUSTRY: Implications of these findings for safety and psychological contract research are discussed.

  19. Evaluation of contract time estimation and contracting procedures for louisiana department of transportation and development construction projects : final report : volume I.

    DOT National Transportation Integrated Search

    1995-09-11

    The purpose of the research was to provide the Louisiana Department of Transportation and Development (LaDOTD) with a systematic approach to the determination of contract time and to explore innovative contracting procedures that may prove beneficial...

  20. Calibrated sulfur isotope abundance ratios of three IAEA sulfur isotope reference materials and V-CDT with a reassessment of the atomic weight of sulfur

    NASA Astrophysics Data System (ADS)

    Ding, T.; Valkiers, S.; Kipphardt, H.; De Bièvre, P.; Taylor, P. D. P.; Gonfiantini, R.; Krouse, R.

    2001-08-01

    Calibrated values have been obtained for sulfur isotope abundance ratios of sulfur isotope reference materials distributed by the IAEA (Vienna). For the calibration of the measurements, a set of synthetic isotope mixtures were prepared gravimetrically from high purity Ag2S materials enriched in32S, 33S, and 34S. All materials were converted into SF6 gas and subsequently, their sulfur isotope ratios were measured on the SF5+ species using a special gas source mass spectrometer equipped with a molecular flow inlet system (IRMM's Avogadro II amount comparator). Values for the 32S/34S abundance ratios are 22.650 4(20), 22.142 4(20), and 23.393 3(17) for IAEA-S-1, IAEA-S-2, and IAEA-S-3, respectively. The calculated 32S/34S abundance ratio for V-CDT is 22.643 6(20), which is very close to the calibrated ratio obtained by Ding et al. (1999). In this way, the zero point of the VCDT scale is anchored firmly to the international system of units SI. The 32S/33S abundance ratios are 126.942(47), 125.473(55), 129.072(32), and 126.948(47) for IAEA-S-1, IAEA-S-2, IAEA-S-3, and V-CDT, respectively. In this way, the linearity of the V-CDT scale is improved over this range. The values of the sulfur molar mass for IAEA-S-1 and V-CDT were calculated to be 32.063 877(56) and 32.063 911(56), respectively, the values with the smallest combined uncertainty ever reported for the sulfur molar masses (atomic weights).

  1. Radiation processing techniques in remediation of pollutants, and the role of the IAEA in supporting capacity building in developing countries

    NASA Astrophysics Data System (ADS)

    Haji-Saeid, S. Mohammad.; Sampa, M. H.; Safrany, A.; Sabharwal, S.; Ramamoorthy, N.

    2012-08-01

    Radiation treatment, or a combination of radiation with conventional biological-chemical-physical processes, can help in the remediation of contaminated surfaces and in combating industrial chemical effluents and air pollution. The use of ionizing radiation as a powerful tool for inactivation of microbes is a valuable option to address likely threats from biohazard contamination that could be introduced either deliberately or inadvertently into areas where the public are exposed to, as well as for treatment of volatile organic compounds and similar hazardous chemical agents is an emerging development in tackling harmful pollutants. The role of the IAEA has been crucial both in supporting the development of local capabilities as well as in fostering international cooperation due to the multidisciplinary expertise required for achieving sustainable benefits. The IAEA is implementing Coordinated Research Projects, (CRP) thematic topical reviews of issues and challenges involved, and Technical Cooperation (TC) assistance in establishing and maintaining infrastructure in the MS. This paper will give an insight into the above mentioned IAEA activities, with examples of successes achieved through CRPs, as well as challenges on the road for broader dissemination of radiation processing technology for environmental remediation.

  2. International contributions to IAEA-NEA heat transfer databases for supercritical fluids

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leung, L. K. H.; Yamada, K.

    2012-07-01

    An IAEA Coordinated Research Project on 'Heat Transfer Behaviour and Thermohydraulics Code Testing for SCWRs' is being conducted to facilitate collaboration and interaction among participants from 15 organizations. While the project covers several key technology areas relevant to the development of SCWR concepts, it focuses mainly on the heat transfer aspect, which has been identified as the most challenging. Through the collaborating effort, large heat-transfer databases have been compiled for supercritical water and surrogate fluids in tubes, annuli, and bundle subassemblies of various orientations over a wide range of flow conditions. Assessments of several supercritical heat-transfer correlations were performed usingmore » the complied databases. The assessment results are presented. (authors)« less

  3. Proficiency Testing as a tool to monitor consistency of measurements in the IAEA/WHO Network of Secondary Standards Dosimetry Laboratories

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Meghzifene, Ahmed; Czap, Ladislav; Shortt, Ken

    2008-08-14

    The International Atomic Energy Agency (IAEA) and the World Health Organization (WHO) established a Network of Secondary Standards Dosimetry Laboratories (IAEA/WHO SSDL Network) in 1976. Through SSDLs designated by Member States, the Network provides a direct link of national dosimetry standards to the international measurement system of standards traceable to the Bureau International des Poids et Mesures (BIPM). Within this structure and through the proper calibration of field instruments, the SSDLs disseminate S.I. quantities and units.To ensure that the services provided by SSDL members to end-users follow internationally accepted standards, the IAEA has set up two different comparison programmes. Onemore » programme relies on the IAEA/WHO postal TLD service and the other uses comparisons of calibrated ionization chambers to help the SSDLs verify the integrity of their national standards and the procedures used for the transfer of the standards to the end-users. The IAEA comparisons include {sup 60}Co air kerma (N{sub K}) and absorbed dose to water (N{sub D,W}) coefficients. The results of the comparisons are confidential and are communicated only to the participants. This is to encourage participation of the laboratories and their full cooperation in the reconciliation of any discrepancy.This work describes the results of the IAEA programme comparing calibration coefficients for radiotherapy dosimetry, using ionization chambers. In this programme, ionization chambers that belong to the SSDLs are calibrated sequentially at the SSDL, at the IAEA, and again at the SSDL. As part of its own quality assurance programme, the IAEA has participated in several regional comparisons organized by Regional Metrology Organizations.The results of the IAEA comparison programme show that the majority of SSDLs are capable of providing calibrations that fall inside the acceptance level of 1.5% compared to the IAEA.« less

  4. Radiation processing of natural polymers: The IAEA contribution

    NASA Astrophysics Data System (ADS)

    Haji-Saeid, Mohammad; Safrany, Agnes; Sampa, Maria Helena de O.; Ramamoorthy, Natesan

    2010-03-01

    Radiation processing offers a clean and additive-free method for preparation of value-added novel materials based on renewable, non-toxic, and biodegradable natural polymers. Crosslinked natural polymers can be used as hydrogel wound dressings, face cleaning cosmetic masks, adsorbents of toxins, and non-bedsore mats; while low molecular weight products show antibiotic, antioxidant, and plant-growth promoting properties. Recognizing the potential benefits that radiation technology can offer for processing of natural polymers into useful products, the IAEA implemented a coordinated research project (CRP) on "Development of Radiation-processed products of Natural Polymers for application in Agriculture, Healthcare, Industry and Environment". This CRP was launched at the end of 2007 with participation of 16 MS to help connecting radiation technology and end-users to derive enhanced benefits from these new value-added products of radiation-processed natural materials. In this paper the results of activities in participating MS related to this work will be presented.

  5. 42 CFR 434.6 - General requirements for all contracts and subcontracts. P>(a) Contracts. All contracts under...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false General requirements for all contracts and subcontracts. P>(a) Contracts. All contracts under this part must include all of the following: 434.6 Section... contracts and subcontracts.P>(a) Contracts. All contracts under this part must include all of the following...

  6. Teaching Contracts with Contracts

    ERIC Educational Resources Information Center

    Misner, Robert L.

    1977-01-01

    The teaching of contracts law is an area that lends itself easily to introducing students to realistic factual situations. An exercise is described in which students were assigned to separate "firms" with volunteers from the later law school classes as clients. Each firm was responsible for submitting a signed contract and an accompanying paper.…

  7. 23 CFR 635.121 - Contract time and contract time extensions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... TRAFFIC OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.121 Contract time and contract time extensions. (a) The STD should have adequate written procedures for the determination of contract... 23 Highways 1 2010-04-01 2010-04-01 false Contract time and contract time extensions. 635.121...

  8. 48 CFR 1835.070 - NASA contract clauses and solicitation provision.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false NASA contract clauses and....070 NASA contract clauses and solicitation provision. (a) The contracting officer shall insert the... ensure that the provision at 1852.235-72, Instructions for Responding to NASA Research Announcements, is...

  9. 48 CFR 1835.070 - NASA contract clauses and solicitation provision.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true NASA contract clauses and....070 NASA contract clauses and solicitation provision. (a) The contracting officer shall insert the... ensure that the provision at 1852.235-72, Instructions for Responding to NASA Research Announcements, is...

  10. 48 CFR 1835.070 - NASA contract clauses and solicitation provision.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 6 2013-10-01 2013-10-01 false NASA contract clauses and....070 NASA contract clauses and solicitation provision. (a) The contracting officer shall insert the... ensure that the provision at 1852.235-72, Instructions for Responding to NASA Research Announcements, is...

  11. 48 CFR 1835.070 - NASA contract clauses and solicitation provision.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false NASA contract clauses and....070 NASA contract clauses and solicitation provision. (a) The contracting officer shall insert the... ensure that the provision at 1852.235-72, Instructions for Responding to NASA Research Announcements, is...

  12. 48 CFR 1835.070 - NASA contract clauses and solicitation provision.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false NASA contract clauses and....070 NASA contract clauses and solicitation provision. (a) The contracting officer shall insert the... ensure that the provision at 1852.235-72, Instructions for Responding to NASA Research Announcements, is...

  13. Court Cases Involving Contracts for School Districts

    ERIC Educational Resources Information Center

    Allen, L. Hank

    2011-01-01

    The purpose of this research was to analyze trends in the United States regarding contract disputes that exist in school districts. Court cases were identified at the state and federal level to determine the outcomes and the fact patterns of contract disputes. To gain the knowledge of how courts handle cases of contractual breach, contracts…

  14. The 1998 Australian external beam radiotherapy survey and IAEA/WHO TLD postal dose quality audit.

    PubMed

    Huntley, R; Izewska, J

    2000-03-01

    The results of an updated Australian survey of external beam radiotherapy centres are presented. Most of the centres provided most of the requested information. The relative caseloads of various linear accelerator photon and electron beams have not changed significantly since the previous survey in 1995. The mean age of Australian LINACs is 7.1 years and that of other radiotherapy machines is 14.7 years. Every Australian radiotherapy centre participated in a special run of the IAEA/WHO TLD postal dose quality audit program, which was provided for Australian centres by the IAEA and WHO in May 1998. The dose quoted by the centres was in nearly every case within 1.5% of the dose assessed by the IAEA. This is within the combined standard uncertainty of the IAEA TLD service (1.8%). The results confirm the accuracy and precision of radiotherapy dosimetry in Australia and the adequate dissemination of the Australian standards from ARL (now ARPANSA) to the centres. The Australian standards have recently been shown to agree with those of other countries to within 0.25% by comparison with the BIPM.

  15. The US Support Program to IAEA Safeguards Priority of Training and Human Resources

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Queirolo,A.

    2008-06-13

    The U.S. Support Program to IAEA Safeguards (USSP) priority of training and human resources is aimed at providing the Department of Safeguards with an appropriate mixture of regular staff and extrabudgetary experts who are qualified to meet the IAEA's technical needs and to provide personnel with appropriate instruction to improve the technical basis and specific skills needed to perform their job functions. The equipment and methods used in inspection activities are unique, complex, and evolving. New and experienced safeguards inspectors need timely and effective training to perform required tasks and to learn new skills prescribed by new safeguards policies ormore » agreements. The role of the inspector has changed from that of strictly an accountant to include that of a detective. New safeguards procedures are being instituted, and therefore, experienced inspectors must be educated on these new procedures. The USSP also recognizes the need for training safeguards support staff, particularly those who maintain and service safeguards equipment (SGTS), and those who perform information collection and analysis (SGIM). The USSP is committed to supporting the IAEA with training to ensure the effectiveness of all staff members and will continue to offer its assistance in the development and delivery of basic, refresher, and advanced training courses. This paper will discuss the USSP ongoing support in the area of training and IAEA staffing.« less

  16. Relational Contract: Applicable to Department of Defense Contracts

    DTIC Science & Technology

    1989-12-01

    examine the evolution of contract law and, in particular, the role of contractual incompleteness in exchange relationships. 2.1.1. The Classical Approach...Classical contract law facilitates exchange by separately detailing all aspects of the contracting process 9 at the outset by prespecification of all...modifications after contractual performance has begun. According to Williamson (1979), classical contract law implements prespecification through legal

  17. IAEA activities in the area of partitioning and transmutation

    NASA Astrophysics Data System (ADS)

    Stanculescu, Alexander

    2006-06-01

    Four major challenges are facing the long-term development of nuclear energy: improvement of the economic competitiveness, meeting increasingly stringent safety requirements, adhering to the criteria of sustainable development, and public acceptance. Meeting the sustainability criteria is the driving force behind the topic of this paper. In this context, sustainability has two aspects: natural resources and waste management. IAEA's activities in the area of Partitioning and Transmutation (P&T) are mostly in response to the latter. While not involving the large quantities of gaseous products and toxic solid wastes associated with fossil fuels, radioactive waste disposal is today's dominant public acceptance issue. In fact, small waste quantities permit a rigorous confinement strategy, and mined geological disposal is the strategy followed by some countries. Nevertheless, political opposition arguing that this does not yet constitute a safe disposal technology has largely stalled these efforts. One of the primary reasons cited is the long life of many of the radioisotopes generated from fission. This concern has led to increased R&D efforts to develop a technology aimed at reducing the amount and radio-toxicity of long-lived radioactive waste through transmutation in fission reactors or sub-critical systems. In the frame of the Project on Technology Advances in Fast Reactors and Accelerator-Driven Systems (ADS), the IAEA initiated a number of activities on utilization of plutonium and transmutation of long-lived radioactive waste, ADS, and deuterium-tritium plasma-driven sub-critical systems. The paper presents past accomplishments, current status and planned activities of this IAEA project.

  18. Options for change in the NHS consultant contract.

    PubMed

    Clarke, R W; Gray, C

    The lead negotiators for the management and consultant sides in an NHS trust in northern England responded to debate in their trust about consultant contracts by offering to research the attitudes of their peers towards a variety of contract options. The options tested included the current contract; models already examined in the trust and elsewhere, such as time sensitive and mild performance related contracts; and some more radical and speculative possibilities, including consultants franchising their services to the trust. Beyond the predictable conclusion that consultants would prefer no change while managers desired it, a time sensitive contract emerged as having potential for successful negotiation. On the other hand, neither consultants nor managers favoured a strict performance related contract or a fee for service contract. There was a strong similarity of opinion between the two groups on the relative salary values of the options, though the consultants consistently priced these higher than the managers.

  19. Options for change in the NHS consultant contract.

    PubMed Central

    Clarke, R. W.; Gray, C.

    1994-01-01

    The lead negotiators for the management and consultant sides in an NHS trust in northern England responded to debate in their trust about consultant contracts by offering to research the attitudes of their peers towards a variety of contract options. The options tested included the current contract; models already examined in the trust and elsewhere, such as time sensitive and mild performance related contracts; and some more radical and speculative possibilities, including consultants franchising their services to the trust. Beyond the predictable conclusion that consultants would prefer no change while managers desired it, a time sensitive contract emerged as having potential for successful negotiation. On the other hand, neither consultants nor managers favoured a strict performance related contract or a fee for service contract. There was a strong similarity of opinion between the two groups on the relative salary values of the options, though the consultants consistently priced these higher than the managers. PMID:8086915

  20. Defining Acquisition and Contracting Terms Associated with Contract Administration

    DTIC Science & Technology

    1990-09-01

    for being such a dedicated scholar. You motivated me to study and as a result I have obtained my goals. May we be as successful in all our future...Assumptions and Scope of the Research ............ 1-8 1.7 Organization of the Study ...... ................ 1-9 II. Literature Review...Abstract The purpose of this study was to synthesize definitions for 20 terms associated with contract administration. To adequately accomplish this

  1. Contract Design: Financial Options and Risk

    PubMed Central

    Amelung, Volker E.; Juhnke, Christin

    2018-01-01

    Introduction: Integrated care systems as well as accountable care organisations (ACOs) in the US and similar concepts in other countries are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. By this the total costs of care shall be reduced. When designing healthcare options contractors are faced with a variety of financial options. The costs of market utilisation are highly relevant for the conception of healthcare contracts; furthermore contract-specific investments are an obstacle to the efficient operation of ACOs. Methods: A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. This article is the second in a row of three that are all published in this issue and contribute to a specific issue in designing healthcare contracts. The first dealt with the organisation of contracts and information asymmetries, while part 3 concludes with the question of risk management and evaluation. The specific research question of this second article focusses on the financial options and reimbursement schemes that are available to define healthcare contracts. Results: A healthcare contract is a relational contract, which determines the level of reimbursement, the scope of services and the quality between service providers and payers, taking account of the risks relating to population and performance. A relational contract is an agreement based upon assumption of a longer timeframe. A major obstacle to the practical implementation of healthcare contracts is the prognosis of the inflows and outflows due to the actuarial risks of the insured population. Financing conditions and reimbursement arrangements that are based on a prospectively determined fixed price, have a significant drawback: it is very difficult to take the differences in health status and the utilisation of

  2. Contract Design: Financial Options and Risk.

    PubMed

    Mühlbacher, Axel C; Amelung, Volker E; Juhnke, Christin

    2018-01-12

    Integrated care systems as well as accountable care organisations (ACOs) in the US and similar concepts in other countries are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. By this the total costs of care shall be reduced. When designing healthcare options contractors are faced with a variety of financial options. The costs of market utilisation are highly relevant for the conception of healthcare contracts; furthermore contract-specific investments are an obstacle to the efficient operation of ACOs. A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. This article is the second in a row of three that are all published in this issue and contribute to a specific issue in designing healthcare contracts. The first dealt with the organisation of contracts and information asymmetries, while part 3 concludes with the question of risk management and evaluation. The specific research question of this second article focusses on the financial options and reimbursement schemes that are available to define healthcare contracts. A healthcare contract is a relational contract, which determines the level of reimbursement, the scope of services and the quality between service providers and payers, taking account of the risks relating to population and performance. A relational contract is an agreement based upon assumption of a longer timeframe. A major obstacle to the practical implementation of healthcare contracts is the prognosis of the inflows and outflows due to the actuarial risks of the insured population. Financing conditions and reimbursement arrangements that are based on a prospectively determined fixed price, have a significant drawback: it is very difficult to take the differences in health status and the utilisation of distinct insured clientele

  3. Contracting for Complex Products

    DTIC Science & Technology

    2010-05-01

    asymmetries, and barriers to market entry and exit (e.g., Mankiw , et al., 2002). Goods may be non-rivalrous or non-excludable so that transferable property...investments. Expenditures are asset specific to the extent they have no economic value outside the product being produced (Williamson, 2005). For...example, some research in the US space program produced economic value outside the contract (e.g., Tang), while other research produced little value

  4. The Mailbox Computer System for the IAEA verification experiment on HEU downlending at the Portsmouth Gaseous Diffusion Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Aronson, A.L.; Gordon, D.M.

    IN APRIL 1996, THE UNITED STATES (US) ADDED THE PORTSMOUTH GASEOUS DIFFUSION PLANT TO THE LIST OF FACILITIES ELIGIBLE FOR THE APPLICATION OF INTERNATIONAL ATOMIC ENERGY AGENCY (IAEA) SAFEGUARDS. AT THAT TIME, THE US PROPOSED THAT THE IAEA CARRY OUT A ''VERIFICATION EXPERIMENT'' AT THE PLANT WITH RESPECT TO DOOWNBLENDING OF ABOUT 13 METRIC TONS OF HIGHLY ENRICHED URANIUM (HEU) IN THE FORM OF URANIUM HEXAFLUROIDE (UF6). DURING THE PERIOD DECEMBER 1997 THROUGH JULY 1998, THE IAEA CARRIED OUT THE REQUESTED VERIFICATION EXPERIMENT. THE VERIFICATION APPROACH USED FOR THIS EXPERIMENT INCLUDED, AMONG OTHER MEASURES, THE ENTRY OF PROCESS-OPERATIONAL DATA BYmore » THE FACILITY OPERATOR ON A NEAR-REAL-TIME BASIS INTO A ''MAILBOX'' COMPUTER LOCATED WITHIN A TAMPER-INDICATING ENCLOSURE SEALED BY THE IAEA.« less

  5. Determinants of Service Contract Outcomes

    DTIC Science & Technology

    2011-04-30

    requiring researchers to brief sponsors on project findings as a condition of funding award; “pushing” potentially high- impact research reports (e.g...allocate resources towards those factors that have greater impacts and avoid the inefficient use of resources on those factors that have little or no... impacts . The objective of this research, therefore, is to address existing gaps in the literature and offer service contract practitioners a

  6. Contracts, grants and funding summary of supersonic cruise research and variable-cycle engine technology programs, 1972 - 1982

    NASA Technical Reports Server (NTRS)

    Hoffman, S.; Varholic, M. C.

    1983-01-01

    NASA-SCAR (AST) program was initiated in 1972 at the direct request of the Executive Office of the White House and Congress following termination of the U.S. SST program. The purpose of SCR was to conduct a focused research and technology program on those technology programs which contributed to the SST termination and, also, to provide an expanded data base for future civil and military supersonic transport aircraft. Funding for the Supersonic Cruise Research (SCR) Program was initiated in fiscal year 1973 and terminated in fiscal year 1981. The program was implemented through contracts and grants with industry, universities, and by in-house investigations at the NASA/OAST centers. The studies included system studies and five disciplines: propulsion, stratospheric emissions impact, materials and structures, aerodynamic performance, and stability and control. The NASA/Lewis Variable-Cycle Engine (VCE) Component Program was initiated in 1976 to augment the SCR program in the area of propulsion. After about 2 years, the title was changed to VCE Technology program. The total number of contractors and grantees on record at the AST office in 1982 was 101 for SCR and 4 for VCE. This paper presents a compilation of all the contracts and grants as well as the funding summaries for both programs.

  7. Turnaround Time and Market Capacity in Contract Cheating

    ERIC Educational Resources Information Center

    Wallace, Melisa J.; Newton, Philip M.

    2014-01-01

    Contract cheating is the process whereby students auction off the opportunity for others to complete assignments for them. It is an apparently widespread yet under-researched problem. One suggested strategy to prevent contract cheating is to shorten the turnaround time between the release of assignment details and the submission date, thus making…

  8. INF and IAEA: A comparative analysis of verification strategy. [Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scheinman, L.; Kratzer, M.

    1992-07-01

    This is the final report of a study on the relevance and possible lessons of Intermediate Range Nuclear Force (INF) verification to the International Atomic Energy Agency (IAEA) international safeguards activities.

  9. Veterans Affairs Contracting: Improved Oversight Needed for Certain Contractual Arrangements

    DTIC Science & Technology

    2015-07-01

    Federally Funded Research and Development Center HCA Head of Contracting Activity IAA interagency agreement IDIQ indefinite-delivery indefinite...contracts reside in six different VA organizations. Each of these organizations has an individual designated as Head of Contracting Activity ( HCA ), who...properly trained, stating that HCAs shall develop and implement guidance ensuring only qualified individuals with appropriate training are assigned to

  10. 48 CFR 27.409 - Solicitation provisions and contract clauses

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... business innovation research contract (see paragraph (h) of this section); (iv) To be performed outside the... work (see paragraph (i)(2) of this section); (vi) For the management, operation, design, or... those for the management or operation of Government facilities, and contracts and subcontracts in...

  11. Results for Phase I of the IAEA Coordinated Research Program on HTGR Uncertainties

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Strydom, Gerhard; Bostelmann, Friederike; Yoon, Su Jong

    2015-01-01

    The quantification of uncertainties in design and safety analysis of reactors is today not only broadly accepted, but in many cases became the preferred way to replace traditional conservative analysis for safety and licensing analysis. The use of a more fundamental methodology is also consistent with the reliable high fidelity physics models and robust, efficient, and accurate codes available today. To facilitate uncertainty analysis applications a comprehensive approach and methodology must be developed and applied. High Temperature Gas-cooled Reactors (HTGR) has its own peculiarities, coated particle design, large graphite quantities, different materials and high temperatures that also require other simulationmore » requirements. The IAEA has therefore launched a Coordinated Research Project (CRP) on the HTGR Uncertainty Analysis in Modeling (UAM) in 2013 to study uncertainty propagation specifically in the HTGR analysis chain. Two benchmark problems are defined, with the prismatic design represented by the General Atomics (GA) MHTGR-350 and a 250 MW modular pebble bed design similar to the HTR-PM (INET, China). This report summarizes the contributions of the HTGR Methods Simulation group at Idaho National Laboratory (INL) up to this point of the CRP. The activities at INL have been focused so far on creating the problem specifications for the prismatic design, as well as providing reference solutions for the exercises defined for Phase I. An overview is provided of the HTGR UAM objectives and scope, and the detailed specifications for Exercises I-1, I-2, I-3 and I-4 are also included here for completeness. The main focus of the report is the compilation and discussion of reference results for Phase I (i.e. for input parameters at their nominal or best-estimate values), which is defined as the first step of the uncertainty quantification process. These reference results can be used by other CRP participants for comparison with other codes or their own

  12. An analysis of cost overruns on defense acquisition contracts

    NASA Technical Reports Server (NTRS)

    Christensen, David S.

    1994-01-01

    This article examines the history of cost overruns reported on 64 completed defense contracts. Its purpose is to formally test the observation of the Under Secretary. Results confirm the observation at the 95 percent level of confidence, and were generally insensitive to the contract type (price, cost), the contract phase (development, production), the type of weapon system (air, ground, sea), and the armed forces service (Air Force, Army, Navy) that managed the contract. After a review of terminology, concepts, and related research for those unfamiliar with the area, the methodology, results, and managerial implications are described.

  13. Contract Design: Risk Management and Evaluation.

    PubMed

    Mühlbacher, Axel C; Amelung, Volker E; Juhnke, Christin

    2018-01-12

    Effective risk adjustment is an aspect that is more and more given weight on the background of competitive health insurance systems and vital healthcare systems. The risk structure of the providers plays a vital role in Pay for Performance. A prerequisite for optimal incentive-based service models is a (partial) dependence of the agent's returns on the provider's gain level. Integrated care systems as well as accountable care organisations (ACOs) in the US and similar concepts in other countries are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. By this the total costs of care shall be reduced. Little is known about the contractual design and the main challenges of delegating "accountability" to these new kinds of organisations and/or contracts. The costs of market utilisation are highly relevant for the conception of healthcare contracts; furthermore information asymmetries and contract-specific investments are an obstacle to the efficient operation of ACOs. A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. The research question in this article focuses on how reimbursement strategies, evaluation of measures and methods of risk adjustment can best be integrated in healthcare contracting. Each integrated care contract includes challenges for both payers and providers without having sufficient empirical data on both sides. These challenges are clinical, administrative or financial nature. Risk adjusted contracts ensure that the reimbursement roughly matches the true costs resulting from the morbidity of a population. If reimbursement of care provider corresponds to the actual expenses for an individual/population the problem of risk selection is greatly reduced. The currently used methods of risk adjustment have widely differing model and forecast

  14. Research participation as a contract.

    PubMed

    Lawson, Craig

    1995-01-01

    In this article, I present a contractualist conception of human-participant research ethics, arguing that the most appropriate source of the rights and responsibilities of researcher and participant is the contractual understanding between them. This conception appears to explain many of the more fundamental ethical incidents of human-participant research. I argue that a system of contractual rights and responsibilities would allow a great deal of research that has often been felt to be ethically problematic, such as research involving deception, concealed research, and research on dependent populations. However, in defining the conditions under which such research should be permissible, my contractualist theory also makes it clear that there are limits -- and explains what those limits are -- to the propriety of such research.

  15. 48 CFR 2035.70 - Contract clauses.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... insert the following clause in all solicitations and contracts for research and development by private contractors and universities and for other technical services, as appropriate: (1) Section 2052.235-70...

  16. 48 CFR 2035.70 - Contract clauses.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... insert the following clause in all solicitations and contracts for research and development by private contractors and universities and for other technical services, as appropriate: (1) Section 2052.235-70...

  17. 48 CFR 2035.70 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... insert the following clause in all solicitations and contracts for research and development by private contractors and universities and for other technical services, as appropriate: (1) Section 2052.235-70...

  18. 48 CFR 2035.70 - Contract clauses.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... insert the following clause in all solicitations and contracts for research and development by private contractors and universities and for other technical services, as appropriate: (1) Section 2052.235-70...

  19. Contract Design: The problem of information asymmetry

    PubMed Central

    Amelung, Volker E.; Juhnke, Christin

    2018-01-01

    Introduction: Integrated care systems are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. Little is known about the contractual design and the main challenges of delegating “accountability” to these new kinds of organisations and/or contracts. The research question in this article focuses on how healthcare contracts can look like and which possible problems arise in designing such contracts. In this a special interest is placed on information asymmetries. Methods: A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. This article is the first in a row of three that all contribute to a specific issue in designing healthcare contracts. Starting with the organisation of contracts and information asymmetries, part 2 focusses on financial options and risks and part 3 finally concludes with the question of risk management and evaluation. Results: Healthcare contracting between providers and payers will have a major impact on the overall design of future healthcare systems. If Integrated care systems or any other similar concept of care delivery are to be contracted directly by payers to manage the continuum of care the costs of market utilisation play an essential role. Transaction costs also arise in the course of the negotiation and implementation of contracts. These costs are the reason why it is generally not possible to conclude perfect (complete) contracts. Problems with asymmetric distribution of information can relate to the situation before a contract is concluded (adverse selection) and after conclusion of a contract (moral hazard). Discussion and Conclusions: Information asymmetries are seen as a major obstacle to the efficient operation of integrated care programmes. Coordination and motivation problems cannot be solved at no-costs. The

  20. Contract Design: The problem of information asymmetry.

    PubMed

    Mühlbacher, Axel C; Amelung, Volker E; Juhnke, Christin

    2018-01-12

    Integrated care systems are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. Little is known about the contractual design and the main challenges of delegating "accountability" to these new kinds of organisations and/or contracts. The research question in this article focuses on how healthcare contracts can look like and which possible problems arise in designing such contracts. In this a special interest is placed on information asymmetries. A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. This article is the first in a row of three that all contribute to a specific issue in designing healthcare contracts. Starting with the organisation of contracts and information asymmetries, part 2 focusses on financial options and risks and part 3 finally concludes with the question of risk management and evaluation. Healthcare contracting between providers and payers will have a major impact on the overall design of future healthcare systems. If Integrated care systems or any other similar concept of care delivery are to be contracted directly by payers to manage the continuum of care the costs of market utilisation play an essential role. Transaction costs also arise in the course of the negotiation and implementation of contracts. These costs are the reason why it is generally not possible to conclude perfect (complete) contracts. Problems with asymmetric distribution of information can relate to the situation before a contract is concluded (adverse selection) and after conclusion of a contract (moral hazard). Information asymmetries are seen as a major obstacle to the efficient operation of integrated care programmes. Coordination and motivation problems cannot be solved at no-costs. The presented problems in the design of selective individual contracts

  1. Polymorphic Contracts

    NASA Astrophysics Data System (ADS)

    Belo, João Filipe; Greenberg, Michael; Igarashi, Atsushi; Pierce, Benjamin C.

    Manifest contracts track precise properties by refining types with predicates - e.g., {x : Int |x > 0 } denotes the positive integers. Contracts and polymorphism make a natural combination: programmers can give strong contracts to abstract types, precisely stating pre- and post-conditions while hiding implementation details - for example, an abstract type of stacks might specify that the pop operation has input type {x :α Stack |not ( empty x )} . We formalize this combination by defining FH, a polymorphic calculus with manifest contracts, and establishing fundamental properties including type soundness and relational parametricity. Our development relies on a significant technical improvement over earlier presentations of contracts: instead of introducing a denotational model to break a problematic circularity between typing, subtyping, and evaluation, we develop the metatheory of contracts in a completely syntactic fashion, omitting subtyping from the core system and recovering it post facto as a derived property.

  2. A Guide to Educational Performance Contracting.

    ERIC Educational Resources Information Center

    Hall, G. R.; And Others

    This report is distilled from Rand's findings in previously reported research and from new research. It is addressed to school board members, administrators, and other educational decisionmakers who may be contemplating a performance contracting program. The guide follows the life cycle of a project and identifies the three major phases as…

  3. The impact of the International Atomic Energy Agency (IAEA) program on radiation and tissue banking in Argentina.

    PubMed

    Kairiyama, Eulogia; Morales Pedraza, Jorge

    2009-05-01

    Tissue banking activities in Argentina started in 1993. The regulatory and controlling national authority on organ, tissue and cells for transplantation activity is the National Unique Coordinating Central Institute for Ablation and Implant (INCUCAI). Three tissue banks were established under the IAEA program and nine other banks participated actively in the implementation of this program. As result of the implementation of the IAEA program in Argentina and the work done by the established tissue banks, more and more hospitals are now using, in a routine manner, radiation sterilised tissues processed by these banks. During the period 1992-2005, more than 21 016 tissues were produced and irradiated in the tissue banks participating in the IAEA program. Within the framework of the training component of the IAEA program, Argentina has been selected to host the Regional Training Centre for Latin American. In this centre, tissue bank operators and medical personal from Latin American countries were trained. Since 1999, Argentina has organised four regular regional training courses and two virtual regional training courses. More than twenty (20) tissue bank operators and medical personnel from Argentina were trained under the IAEA program in the six courses organised in the country. In general, ninety (96) tissue bank operators and medical personnel from eight Latin-American countries were trained in the Buenos Aires regional training centre. From Argentina 16 students graduated in these courses.

  4. Lack of symmetry in employees' perceptions of the psychological contract.

    PubMed

    Jepsen, Denise M; Rodwell, John J

    2012-06-01

    Despite debate on the nature of employees' perceptions of their psychological contract, little research has compared employees' and employers' sides of the psychological contract. All 80 items from both scales in the Psychological Contract Inventory were used in a survey of 436 currently working, non-student respondents. Structural equation modeling yielded nonsymmetrical perspectives on promises and obligations, highlighting the validity of approaching the issues via individual perceptions.

  5. Training in Tbilisi nuclear facility provides new sampling perspectives for IAEA inspectors

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brim, Cornelia P.

    2016-06-08

    Office of Nonproliferation and Arms Control- (NPAC-) sponsored training in a “cold” nuclear facility in Tbilisi, Georgia provides International Atomic Energy Agency (IAEA) inspectors with a new perspective on environmental sampling strategies. Sponsored by the Nuclear Safeguards program under the NPAC, Pacific Northwest National Laboratory (PNNL) experts have been conducting an annual weeklong class for IAEA inspectors in a closed nuclear facility since 2011. The Andronikashvili Institute of Physics and the Republic of Georgia collaborate with PNNL to provide the training, and the U.S. Department of State, the U.S. Embassy in Tbilisi and the U.S. Mission to International Organizations inmore » Vienna provide logistical support.« less

  6. 29 CFR 4.122 - Contracts for operation of postal contract stations.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Application of the McNamara-O'Hara Service Contract Act Specific Exclusions § 4.122 Contracts for operation of postal contract stations. The Act, in paragraph (7) of section 7, exempts from its provisions “any... 29 Labor 1 2010-07-01 2010-07-01 true Contracts for operation of postal contract stations. 4.122...

  7. Resolving Contract Disputes

    DTIC Science & Technology

    1988-11-01

    as part of the required training for Army contracting personnel. Specifically, these were courses in contract administration and contract law offered...courts and boards. The process itself was discussed in very general terms.[7] The AFIT Government Contract Law Course concerns itself with legal concepts...Washington, D.C., 1984 4. . Air Force Institute of Technology, Government Contract Law , Course Manual, Wright-Patterson Air Force Base, Ohio, April

  8. Contract Design: Risk Management and Evaluation

    PubMed Central

    Amelung, Volker E.; Juhnke, Christin

    2018-01-01

    Introduction: Effective risk adjustment is an aspect that is more and more given weight on the background of competitive health insurance systems and vital healthcare systems. The risk structure of the providers plays a vital role in Pay for Performance. A prerequisite for optimal incentive-based service models is a (partial) dependence of the agent’s returns on the provider’s gain level. Integrated care systems as well as accountable care organisations (ACOs) in the US and similar concepts in other countries are advocated as an effective method of improving the performance of healthcare systems. These systems outline a payment and care delivery model that intends to tie provider reimbursements to predefined quality metrics. By this the total costs of care shall be reduced. Methods: Little is known about the contractual design and the main challenges of delegating “accountability” to these new kinds of organisations and/or contracts. The costs of market utilisation are highly relevant for the conception of healthcare contracts; furthermore information asymmetries and contract-specific investments are an obstacle to the efficient operation of ACOs. A comprehensive literature review on methods of designing contracts in Integrated Care was conducted. The research question in this article focuses on how reimbursement strategies, evaluation of measures and methods of risk adjustment can best be integrated in healthcare contracting. Results: Each integrated care contract includes challenges for both payers and providers without having sufficient empirical data on both sides. These challenges are clinical, administrative or financial nature. Risk adjusted contracts ensure that the reimbursement roughly matches the true costs resulting from the morbidity of a population. If reimbursement of care provider corresponds to the actual expenses for an individual/population the problem of risk selection is greatly reduced. The currently used methods of risk adjustment

  9. 48 CFR 1832.412 - Contract clause. (NASA supplement paragraphs (e) and (f))

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... AERONAUTICS AND SPACE ADMINISTRATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Advance Payments for... the Small Business Innovation Research (SBIR) or Small Business Technology Transfer (STTR) programs...

  10. 48 CFR 1832.412 - Contract clause. (NASA supplement paragraphs (e) and (f))

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... AERONAUTICS AND SPACE ADMINISTRATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Advance Payments for... the Small Business Innovation Research (SBIR) or Small Business Technology Transfer (STTR) programs...

  11. 48 CFR 1832.412 - Contract clause. (NASA supplement paragraphs (e) and (f))

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... AERONAUTICS AND SPACE ADMINISTRATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Advance Payments for... the Small Business Innovation Research (SBIR) or Small Business Technology Transfer (STTR) programs...

  12. 48 CFR 1832.412 - Contract clause. (NASA supplement paragraphs (e) and (f))

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... AERONAUTICS AND SPACE ADMINISTRATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Advance Payments for... the Small Business Innovation Research (SBIR) or Small Business Technology Transfer (STTR) programs...

  13. 48 CFR 1832.412 - Contract clause. (NASA supplement paragraphs (e) and (f))

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... AERONAUTICS AND SPACE ADMINISTRATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Advance Payments for... the Small Business Innovation Research (SBIR) or Small Business Technology Transfer (STTR) programs...

  14. 17 CFR Appendix C - Demonstration of Compliance That a Contract Is Not Readily Susceptible to Manipulation

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... contract market. When designing a futures contract, the designated contract market should conduct market research so that the contract design meets the risk management needs of prospective users and promotes... users to obtain their views and opinions during the contract design process to ensure the contract's...

  15. Participation in proficiency test for tritium strontium and caesium isotopes in seawater 2015 (IAEA-RML-2015-02)

    NASA Astrophysics Data System (ADS)

    Visetpotjanakit, S.; Kaewpaluek, S.

    2017-06-01

    A proficiency test (PT) exercise has proposed by the International Atomic Energy Agency (IAEA) in the frame of the IAEA Technical Cooperation project RAS/7/021 “Marine benchmark study on the possible impact of the Fukushima radioactive releases in the Asia-Pacific Region for Caesium Determination in Sea Water” since 2012. In 2015 the exercise was referred to Proficiency Test for Tritium, Strontium and Caesium Isotopes in Seawater 2015 (IAEA-RML-2015-02) to analyse3H, 134Cs, 137Cs and90Sr in a seawater sample. OAP was one of the 17 laboratories from 15 countries from Asia-Pacific Region who joined the PT exercise. The aim of our participation was to validate our analytical performance for the accurate determination of radionuclides in seawater by developed methods of radiochemical analysis. OAP submitted results determining the concentration for the three elements i.e. 134Cs, 137Cs and90Sr in seawater to the IAEA. A critical review was made to check suitability of our methodology and the criteria for the accuracy, precision and trueness of our data. The results of both 134Cs and 137Cs passed all criteria which were assigned “Accepted” statuses. Whereas 90Sr analysis did not pass the accuracy test therefore it was considered as “Not accepted” Our results and all other participant results with critical comments were published in the IAEA proficiency test report.

  16. Air Force Needs Better Processes to Appropriately Justify and Manage Cost-Reimbursable Contracts

    DTIC Science & Technology

    2013-03-21

    Contracts Reviewed 4 The Small Business Innovation Research Program 4 Review of Internal Controls 5 ...stimulate high-tech innovation, and increase private-sector commercialization. The SBIR 5 program was established under the Small Business...contracts valued at about $7.4 billion. 5 According to the Office of Federal Procurement Policy, a hybrid contract allows contracting officers to

  17. 48 CFR 4.803 - Contents of contract files.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the type and extent of market research conducted. (7) Government estimate of contract price. (8) A... documentation— (i) Of the type and extent of market research; and (ii) That the NAICS code assigned to the...

  18. Preferred supplier contracts in post-patent prescription drug markets.

    PubMed

    Blankart, Carl Rudolf; Stargardt, Tom

    2016-02-22

    In recent years, the expiration of patents for large drug classes has increased the importance of post-patent drug markets. However, previous research has focused solely on patent drug markets. In this study, the authors evaluate the influence of preferred supplier contracts, the German approach to tendering, in post-patent drug markets using a hierarchical market share attraction model. The authors find that preferred supplier contracts are a powerful strategic instrument for generic manufacturers in a highly competitive environment. They quantify the effects of signing a preferred supplier contract and show that brand-name manufacturers are vulnerable to tendering. Therefore, brand-name manufacturers should readjust their strategies and consider including preferred supplier contracts in their marketing mix. In addition, the authors employ a simulation to demonstrate that a first-mover advantage might be gained from signing a preferred supplier contract. Furthermore, their results can be used as a blueprint for decision makers in the pharmaceutical industry to assess the market share effects of different contracting strategies regarding preferred supplier contracts.

  19. A New Availability-Payment Model for Pricing Performance-Based Logistics Contracts

    DTIC Science & Technology

    2014-06-17

    the contractor maintains a steady revenue (with profit ). Figure 4. Affine Controller Model for Availability Contract Acquisition Research Program... a bankruptcy constraint; and and Deduction(∙) are decision variables for contract design for the level one (public sector) problem. Given...UMD-CM-14-175 ACQUISITION RESEARCH PROGRAM SPONSORED REPORT SERIES A New “Availability-Payment” Model for Pricing Performance- Based

  20. A comparative analysis of quality management standards for contract research organisations in clinical trials.

    PubMed

    Murray, Elizabeth; McAdam, Rodney

    2007-01-01

    This article compares and contrasts the main quality standards in the highly regulated pharmaceutical industry with specific focus on Good Clinical Practice (GCP), the standard for designing, conducting, recording and reporting clinical trials involving human participants. Comparison is made to ISO quality standards, which can be applied to all industries and types of organisation. The study is then narrowed to that of contract research organisations (CROs) involved in the conduct of clinical trials. The paper concludes that the ISO 9000 series of quality standards can act as a company-wide framework for quality management within such organisations by helping to direct quality efforts on a long-term basis without any loss of compliance. This study is valuable because comparative analysis in this domain is uncommon.

  1. 48 CFR 204.470-3 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Protocol, in solicitations and contracts for research and development or major defense acquisition programs...) Other radiological source materials; or (c) Technologies directly related to nuclear power production...

  2. Psychological contract types as moderator in the breach-violation and violation-burnout relationships.

    PubMed

    Jamil, Amber; Raja, Usman; Darr, Wendy

    2013-01-01

    This research examined the relationships between perceived psychological contract breach, felt violation, and burnout in a sample (n = 361) of employees from various organizations in Pakistan. The moderating role of contract types in these relationships was also tested. Findings supported a positive association between perceived psychological contract breach and felt violation and both were positively related to burnout. Transactional and relational contracts moderated the felt violation-burnout relationship. Scores on relational contract type tended to be higher than for transactional contract type showing some contextual influence.

  3. 42 CFR 93.204 - Contract.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Contract. 93.204 Section 93.204 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH...

  4. 42 CFR 93.204 - Contract.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Contract. 93.204 Section 93.204 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH ASSESSMENTS AND HEALTH EFFECTS STUDIES OF HAZARDOUS SUBSTANCES RELEASES AND FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH...

  5. Temporary Employment Contracts in Academia: A Real Option View

    ERIC Educational Resources Information Center

    Brady, Malcolm

    2017-01-01

    This paper examines the strategic use of temporary employment contracts in dealing with supply uncertainty in the form of employee ability that is slow to reveal itself, for example in academia where there exist significant time lags in demonstration of research ability. A temporary contract is modeled as a real option, specifically as a…

  6. Rho A and the Rho kinase pathway regulate fibroblast contraction: Enhanced contraction in constitutively active Rho A fibroblast cells

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nobe, Koji, E-mail: kojinobe@pharm.showa-u.ac.jp; Nobe, Hiromi; Department of Physical Therapy, Bunkyo-Gakuin University

    Research highlights: {yields} Mechanisms of fibroblast cell contraction in collagen matrix. {yields} Assessed an isometric force development using 3D-reconstituted-fibroblast fiber. {yields} Constitutively active Rho A induced the over-contraction of fibroblast cells. {yields} Rho A and Rho kinase pathway has a central role in fibroblast cell contraction. -- Abstract: Fibroblast cells play a central role in the proliferation phase of wound healing processes, contributing to force development. The intracellular signaling pathways regulating this non-muscle contraction are only partially understood. To study the relations between Rho A and contractile responses, constitutively active Rho A (CA-Rho A) fibroblast cells were reconstituted into fibersmore » and the effects of calf serum (CS) on isometric force were studied. CS-induced force in CA-Rho A fibroblast fibers was twice as large as that in wild type (NIH 3T3) fibroblast fibers. During this response, the translocation of Rho A from the cytosol to the membrane was detected by Rho A activity assays and Western blot analysis. Pre-treatment with a Rho specific inhibitor (C3-exoenzyme) suppressed translocation as well as contraction. These results indicate that Rho A activation is essential for fibroblast contraction. The Rho kinase inhibitor ( (Y27632)) inhibited both NIH 3T3 and CA-Rho A fibroblast fiber contractions. Activation of Rho A is thus directly coupled with Rho kinase activity. We conclude that the translocation of Rho A from the cytosol to the membrane and the Rho kinase pathway can regulate wound healing processes mediated by fibroblast contraction.« less

  7. Contracts in radiology practices: contract types and key provisions.

    PubMed

    Muroff, Julie A; Muroff, Lawrence R

    2004-07-01

    A contract between a radiology group and its physician member(s) provides the foundation for the professional relationships in a group practice. The parties are not in positions of parity; contract provisions are structured to maintain the primacy of the group over the individual members. An integration clause should be included to preclude reliance on communications that are not memorialized by the language of the contract. Precise, unambiguous terms must be used to convey the intentions of the parties. The contract should have a clear date of initiation and, if applicable, an effective date of termination. Mechanisms for termination and modification should be expressed clearly to minimize the risk of judicial interference. The method of determining and adjusting the salary and other benefits of the radiologist should be stated, as consideration is necessary to support the existence of a legal contract. The obligations of the radiologist to the practice are often stated in general terms to maximize the group's flexibility. Finally, other key clauses that are discussed in the paper should be incorporated into the contract.

  8. Validating dose rate calibration of radiotherapy photon beams through IAEA/WHO postal audit dosimetry service.

    PubMed

    Jangda, Abdul Qadir; Hussein, Sherali

    2012-05-01

    In external beam radiation therapy (EBRT), the quality assurance (QA) of the radiation beam is crucial to the accurate delivery of the prescribed dose to the patient. One of the dosimetric parameters that require monitoring is the beam output, specified as the dose rate on the central axis under reference conditions. The aim of this project was to validate dose rate calibration of megavoltage photon beams using the International Atomic Energy Agency (IAEA)/World Health Organisation (WHO) postal audit dosimetry service. Three photon beams were audited: a 6 MV beam from the low-energy linac and 6 and 18 MV beams from a dual high-energy linac. The agreement between our stated doses and the IAEA results was within 1% for the two 6 MV beams and within 2% for the 18 MV beam. The IAEA/WHO postal audit dosimetry service provides an independent verification of dose rate calibration protocol by an international facility.

  9. Collaboration in Action: Measuring and Improving Contracting Performance in the University of California Contracting Network

    ERIC Educational Resources Information Center

    Tran, Tam; Bowman-Carpio, LeeAnna; Buscher, Nate; Davidson, Pamela; Ford, Jennifer J.; Jenkins, Erick; Kalay, Hillary Noll; Nakazono, Terry; Orescan, Helene; Sak, Rachael; Shin, Irene

    2017-01-01

    In 2013, the University of California, Biomedical Research, Acceleration, Integration, and Development (UC BRAID) convened a regional network of contracting directors from the five University of California (UC) health campuses to: (i) increase collaboration, (ii) operationalize and measure common metrics as a basis for performance improvement…

  10. 24 CFR 983.206 - HAP contract amendments (to add or substitute contract units).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract amendments (to add or... Contract § 983.206 HAP contract amendments (to add or substitute contract units). (a) Amendment to substitute contract units. At the discretion of the PHA and subject to all PBV requirements, the HAP contract...

  11. Crafting Contracts for International Projects.

    ERIC Educational Resources Information Center

    Richey, John B.

    1993-01-01

    A discussion of the drafting of contracts for international sponsored research projects focuses on the terms of award that relate either to sensitive topics for international sponsors or to significant legal or financial risk to an institution. Issues specific to newly industrializing and developing countries are highlighted. (MSE)

  12. Mutuality and reciprocity in the psychological contracts of employees and employers.

    PubMed

    Dabos, Guillermo E; Rousseau, Denise M

    2004-02-01

    The authors assessed the joint perceptions of the employee and his or her employer to examine mutuality and reciprocity in the employment relationship. Paired psychological contract reports were obtained from 80 employee-employer dyads in 16 university-based research centers. On the basis of in-depth study of the research setting, research directors were identified as primary agents for the university (employer) in shaping the terms of employment of staff scientists (employees). By assessing the extent of consistency between employee and employer beliefs regarding their exchange agreement, the present study mapped the variation and consequences of mutuality and reciprocity in psychological contracts. Results indicate that both mutuality and reciprocity are positively related to archival indicators of research productivity and career advancement, in addition to self-reported measures of Met Expectations and intention to continue working with the employer. Implications for psychological contract theory are presented. ((c) 2004 APA, all rights reserved)

  13. Contracting and Higher Education.

    ERIC Educational Resources Information Center

    Ferris, James M.

    1991-01-01

    The potential gains in efficiency of three types of contracts in college administration are contrasted. Contract types include explicit contracts in the budgeting process between the state and higher education institutions; institutional contracting for inputs; and interinstitutional contracting. The tradeoff between production cost savings and…

  14. 48 CFR 1852.219-85 - Conditions for final payment-SBIR and STTR contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... employment of the principal investigator (PI) identified in this SBIR contract was with the Contractor... number); and 7. For STTR contracts: The primary employment of the principal investigator (PI) identified in this STTR contract was the SBC/Contractor or the research institution (RI). The PI identified in...

  15. 48 CFR 1852.219-85 - Conditions for final payment-SBIR and STTR contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... employment of the principal investigator (PI) identified in this SBIR contract was with the Contractor... number); and 7. For STTR contracts: The primary employment of the principal investigator (PI) identified in this STTR contract was the SBC/Contractor or the research institution (RI). The PI identified in...

  16. 48 CFR 1852.219-85 - Conditions for final payment-SBIR and STTR contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... employment of the principal investigator (PI) identified in this SBIR contract was with the Contractor... number); and 7. For STTR contracts: The primary employment of the principal investigator (PI) identified in this STTR contract was the SBC/Contractor or the research institution (RI). The PI identified in...

  17. 48 CFR 1852.219-85 - Conditions for final payment-SBIR and STTR contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... employment of the principal investigator (PI) identified in this SBIR contract was with the Contractor... number); and 7. For STTR contracts: The primary employment of the principal investigator (PI) identified in this STTR contract was the SBC/Contractor or the research institution (RI). The PI identified in...

  18. 48 CFR 1852.219-85 - Conditions for final payment-SBIR and STTR contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... employment of the principal investigator (PI) identified in this SBIR contract was with the Contractor... number); and 7. For STTR contracts: The primary employment of the principal investigator (PI) identified in this STTR contract was the SBC/Contractor or the research institution (RI). The PI identified in...

  19. Multiple job contracts of physicians in Ceará, Northeastern Brazil.

    PubMed

    Maciel, Regina Heloisa; Santos, João Bosco Feitosa dos; Sales, Telma Bessa; Alves, Marco Aurélio de Andrade; Luna, Ana Paula; Feitosa, Leonardo Bezerra

    2010-10-01

    To analyze the multiple job contracts of physicians in the Brazilian National Health System in the State of Ceará. Documental research was performed about the work contracts of the physicians, based on data of health professional contracts in the municipalities of Ceará state, Northeastern Brazil, in 2008. Indices were created for the quantity of contracts of each physician, as well as the municipalities where each physician maintained work contracts. The distances between the municipalities where they worked was calculated in order to estimate the total weekly hours of work. Of the 7,008 physicians employed by the Ceará state, 3,751 (53.5%) maintain between two and four job contracts and 39 (0.6%) between 11 and 20 contracts. One professional maintained 20 contracts. More than half (51.9%) of the physicians had work contracts that when summed totaled more than 40 weekly working hours and 27.0% (1,894) maintained job contracts with more than one municipality. In order to increase their work income, physicians undertake various jobs, practicing their profession in different locations and various municipalities, involving constant travel and contributing to the precarious conditions of their own lives and, therefore, of the public health system.

  20. 48 CFR 1816.303-70 - Cost-sharing contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... organizations is mandatory in any contract for basic or applied research resulting from an unsolicited proposal... the research, and the contractor has no means of recovering its shared costs on such projects. (2) The... contribution from non-Federal sources; (ii) The extent to which the particular area of research requires...

  1. Deterring Nuclear Proliferation: The Importance of IAEA Safeguards: A TEXTBOOK

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rosenthal, M.D.; Fishbone, L.G.; Gallini, L.

    2012-03-13

    Nuclear terrorism and nuclear proliferation are among the most pressing challenges to international peace and security that we face today. Iran and Syria remain in non-compliance with the safeguards requirements of the NPT, and the nuclear ambitions of North Korea remain unchecked. Despite these challenges, the NPT remains a cornerstone of the nuclear non-proliferation regime, and the safeguards implemented by the International Atomic Energy Agency (IAEA) under the NPT play a critical role in deterring nuclear proliferation.How do they work? Where did they come from? And what is their future? This book answers these questions. Anyone studying the field ofmore » nuclear non-proliferation will benefit from reading this book, and for anyone entering the field, the book will enable them to get a running start. Part I describes the foundations of the international safeguards system: its origins in the 1930s - when new discoveries in physics made it clear immediately that nuclear energy held both peril and promise - through the entry into force in 1970 of the NPT, which codified the role of IAEA safeguards as a means to verify states NPT commitments not to acquire nuclear weapons. Part II describes the NPT safeguards system, which is based on a model safeguards agreement developed specifically for the NPT, The Structure and Content of Agreements between the Agency and States required in connection with the Treaty on the Non-Proliferation of Nuclear Weapons, which has been published by the IAEA as INFCIRC/153. Part III describes events, especially in South Africa, the DPRK, and Iraq in the early 1990s, that triggered a transformation in the way in which safeguards were conceptualized and implemented.« less

  2. Radionuclide transfer to fruit in the IAEA TRS No. 472

    NASA Astrophysics Data System (ADS)

    Carini, F.; Pellizzoni, M.; Giosuè, S.

    2012-04-01

    This paper describes the approach taken to present the information on fruits in the IAEA report TRS No. 472, supported by the IAEA-TECDOC-1616, which describes the key transfer processes, concepts and conceptual models regarded as important for dose assessment, as well as relevant parameters for modelling radionuclide transfer in fruits. Information relate to fruit plants grown in agricultural ecosystems of temperate regions. The relative significance of each pathway after release of radionuclides depends upon the radionuclide, the kind of crop, the stage of plant development and the season at time of deposition. Fruit intended as a component of the human diet is borne by plants that are heterogeneous in habits, and morphological and physiological traits. Information on radionuclides in fruit systems has therefore been rationalised by characterising plants in three groups: woody trees, shrubs, and herbaceous plants. Parameter values have been collected from open literature, conference proceedings, institutional reports, books and international databases. Data on root uptake are reported as transfer factor values related to fresh weight, being consumption data for fruits usually given in fresh weight.

  3. A Critical Analysis of Football Bowl Subdivision Coaching Contract Components

    ERIC Educational Resources Information Center

    Nichols, Justin Keith

    2012-01-01

    This exploratory study is designed to inventory and analyze contract components used by Football Bowl Subdivision (FBS) institutions in the National Collegiate Athletic Association (NCAA) to further contribute to the body research. The FBS is comprised of 120 institutions and 94 of those institutions submitted contracts to "USA Today"…

  4. EMG-Torque Dynamics Change With Contraction Bandwidth.

    PubMed

    Golkar, Mahsa A; Jalaleddini, Kian; Kearney, Robert E

    2018-04-01

    An accurate model for ElectroMyoGram (EMG)-torque dynamics has many uses. One of its applications which has gained high attention among researchers is its use, in estimating the muscle contraction level for the efficient control of prosthesis. In this paper, the dynamic relationship between the surface EMG and torque during isometric contractions at the human ankle was studied using system identification techniques. Subjects voluntarily modulated their ankle torque in dorsiflexion direction, by activating their tibialis anterior muscle, while tracking a pseudo-random binary sequence in a torque matching task. The effects of contraction bandwidth, described by torque spectrum, on EMG-torque dynamics were evaluated by varying the visual command switching time. Nonparametric impulse response functions (IRF) were estimated between the processed surface EMG and torque. It was demonstrated that: 1) at low contraction bandwidths, the identified IRFs had unphysiological anticipatory (i.e., non-causal) components, whose amplitude decreased as the contraction bandwidth increased. We hypothesized that this non-causal behavior arose, because the EMG input contained a component due to feedback from the output torque, i.e., it was recorded from within a closed-loop. Vision was not the feedback source since the non-causal behavior persisted when visual feedback was removed. Repeating the identification using a nonparametric closed-loop identification algorithm yielded causal IRFs at all bandwidths, supporting this hypothesis. 2) EMG-torque dynamics became faster and the bandwidth of system increased as contraction modulation rate increased. Thus, accurate prediction of torque from EMG signals must take into account the contraction bandwidth sensitivity of this system.

  5. Fallout radionuclide-based techniques for assessing the impact of soil conservation measures on erosion control and soil quality: an overview of the main lessons learnt under an FAO/IAEA Coordinated Research Project.

    PubMed

    Dercon, G; Mabit, L; Hancock, G; Nguyen, M L; Dornhofer, P; Bacchi, O O S; Benmansour, M; Bernard, C; Froehlich, W; Golosov, V N; Haciyakupoglu, S; Hai, P S; Klik, A; Li, Y; Lobb, D A; Onda, Y; Popa, N; Rafiq, M; Ritchie, J C; Schuller, P; Shakhashiro, A; Wallbrink, P; Walling, D E; Zapata, F; Zhang, X

    2012-05-01

    This paper summarizes key findings and identifies the main lessons learnt from a 5-year (2002-2008) coordinated research project (CRP) on "Assessing the effectiveness of soil conservation measures for sustainable watershed management and crop production using fallout radionuclides" (D1.50.08), organized and funded by the International Atomic Energy Agency through the Joint FAO/IAEA Division of Nuclear Techniques in Food and Agriculture. The project brought together nineteen participants, from Australia, Austria, Brazil, Canada, Chile, China, Japan, Morocco, Pakistan, Poland, Romania, Russian Federation, Turkey, United Kingdom, United States of America and Vietnam, involved in the use of nuclear techniques and, more particularly, fallout radionuclides (FRN) to assess the relative impacts of different soil conservation measures on soil erosion and land productivity. The overall objective of the CRP was to develop improved land use and management strategies for sustainable watershed management through effective soil erosion control practices, by the use of ¹³⁷Cs (half-life of 30.2 years), ²¹⁰Pb(ex) (half-life of 22.3 years) and ⁷Be (half-life of 53.4 days) for measuring soil erosion over several spatial and temporal scales. The environmental conditions under which the different research teams applied the tools based on the use of fallout radionuclides varied considerably--a variety of climates, soils, topographies and land uses. Nevertheless, the achievements of the CRP, as reflected in this overview paper, demonstrate that fallout radionuclide-based techniques are powerful tools to assess soil erosion/deposition at several spatial and temporal scales in a wide range of environments, and offer potential to monitor soil quality. The success of the CRP has stimulated an interest in many IAEA Member States in the use of these methodologies to identify factors and practices that can enhance sustainable agriculture and minimize land degradation. Copyright

  6. 48 CFR 227.7009-3 - Additional clauses-contracts except running royalty contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-contracts except running royalty contracts. 227.7009-3 Section 227.7009-3 Federal Acquisition Regulations...—contracts except running royalty contracts. The following clauses are examples for use in patent release and settlement agreements, and license agreements not providing for payment by the Government of a running...

  7. 48 CFR 227.7009-3 - Additional clauses-contracts except running royalty contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-contracts except running royalty contracts. 227.7009-3 Section 227.7009-3 Federal Acquisition Regulations...—contracts except running royalty contracts. The following clauses are examples for use in patent release and settlement agreements, and license agreements not providing for payment by the Government of a running...

  8. Can Markers Detect Contract Cheating? Results from a Pilot Study

    ERIC Educational Resources Information Center

    Dawson, Phillip; Sutherland-Smith, Wendy

    2018-01-01

    Contract cheating is the purchasing of custom-made university assignments with the intention of submitting them. Websites providing contract cheating services often claim this form of cheating is undetectable, and no published research has examined this claim. This paper documents a pilot study where markers were paid to mark a mixture of real…

  9. Contract Actions for Leased Equipment

    DTIC Science & Technology

    1999-06-30

    Fundamentals, Fundamentals of Contract Pricing, and Government Contract Law courses. The additional instruction should emphasize the contracting officers...Contracting Fundamentals, Fundamentals of Contract Pricing, and Government Contract Law courses. This additional instruction should emphasize the important...FAR 107.401 and 207.470 in the Basics of Contracting and Government Contract Law courses, and that price analysis in assessing lease versus purchase

  10. 40 CFR 35.4235 - Are there specific provisions my group's contract(s) must contain?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Suspension and Debarment; (g) The following clauses from 40 CFR 30.48: (1) Remedies for breaches of contract...'s contract(s) must contain? 35.4235 Section 35.4235 Protection of Environment ENVIRONMENTAL... provisions my group's contract(s) must contain? Your group must include the following provisions in each of...

  11. NOTE: Monte Carlo simulation of correction factors for IAEA TLD holders

    NASA Astrophysics Data System (ADS)

    Hultqvist, Martha; Fernández-Varea, José M.; Izewska, Joanna

    2010-03-01

    The IAEA standard thermoluminescent dosimeter (TLD) holder has been developed for the IAEA/WHO TLD postal dose program for audits of high-energy photon beams, and it is also employed by the ESTRO-QUALity assurance network (EQUAL) and several national TLD audit networks. Factors correcting for the influence of the holder on the TL signal under reference conditions have been calculated in the present work from Monte Carlo simulations with the PENELOPE code for 60Co γ-rays and 4, 6, 10, 15, 18 and 25 MV photon beams. The simulation results are around 0.2% smaller than measured factors reported in the literature, but well within the combined standard uncertainties. The present study supports the use of the experimentally obtained holder correction factors in the determination of the absorbed dose to water from the TL readings; the factors calculated by means of Monte Carlo simulations may be adopted for the cases where there are no measured data.

  12. Contract Learning.

    ERIC Educational Resources Information Center

    Gilbert, Jay

    Academic work carried out through learning contracts at Empire State College is described. Learning contracts are defined and examples are given. Faculty roles, educational advantages, and implementation methods are discussed. (MLH)

  13. 48 CFR 35.006 - Contracting methods and contract type.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... short-duration fixed-price contract may be useful for developing system design concepts, resolving... contracts as designs become more firmly established, risks are reduced, and production tooling, equipment...

  14. Report: Improved Contract Administration Needed for the Customer Technology Solutions Contract

    EPA Pesticide Factsheets

    Report #13-P-0398, September 16, 2013. Based on our review of the WCF contract EPW08034, which ended September 2012, the EPA needs to improve its contract administration to assist in managing other similar type contracts.

  15. Viable Circumstances for Financial Negotiations in Pakistan Contracting Process

    DTIC Science & Technology

    2015-06-01

    Submission BIW Bath Iron Works BPA Blanket Purchase Agreement CERP Center for Economic Research in Pakistan CICA Competition in Contracting Act CJCS...IDIQ contracts, blanket purchase agreements ( BPAs ), and contractors team arrangements (CTAs) by fulfilling all pre-requisites of government...wide commercial purchase card (FAR 13.301) 2. Purchase orders (FAR 13.302) 3. Blanket purchase agreements ( BPAs ; FAR13.303) 4. Imprest fund and

  16. Benefits of an Air Force Contracting Warrant Officer Program

    DTIC Science & Technology

    2011-12-01

    effects of adding the warrant officer track into the contracting career field. The assessment uses personal interviews and surveys covering job...research investigates the perceived benefits and contrasting effects of adding the warrant officer track into the contracting career field. The...centered on cutting costs in the hopes of increasing revenues, which can be disastrous for both the private and public sectors , in addition to the

  17. Synthesis of 1,3-Dinitrohexahydropyrimidine via Ring Contraction of Ether-Linked Nitramines

    DTIC Science & Technology

    2016-07-01

    ARL-TR-7706 ● JULY 2016 US Army Research Laboratory Synthesis of 1,3-Dinitrohexahydropyrimidine via Ring Contraction of Ether...JULY 2016 US Army Research Laboratory Synthesis of 1,3-Dinitrohexahydropyrimidine via Ring Contraction of Ether-Linked Nitramines by...YOUR FORM TO THE ABOVE ADDRESS. 1. REPORT DATE (DD-MM-YYYY) July 2016 2. REPORT TYPE Final 3. DATES COVERED (From - To) Fiscal Year 2013 4. TITLE

  18. Innovative contracting strategies for combating climate change.

    DOT National Transportation Integrated Search

    2011-11-01

    The state of Maryland has made a strong commitment to combating climate change and reducing : greenhouse gas emissions. This research investigated the state of practice of innovative contracting : solutions to reduce emissions from highway constructi...

  19. Teaching about Contracts.

    ERIC Educational Resources Information Center

    Froman, Michael; Kosnoff, Kathy

    1978-01-01

    Presents teaching strategies for introducing high school students to contract law. Offers as a case study a contract agreement between pro football players and team owners. Stresses basic elements of contracts (offer, acceptance, consideration, and understanding the bargaining process). Journal available from the American Bar Association, 1155…

  20. 48 CFR 1517.204 - Contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contracts. 1517.204 Section 1517.204 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Options 1517.204 Contracts. The SCM may approve a contract with...

  1. The impact of the International Atomic Energy Agency (IAEA) program on radiation and tissue banking in Indonesia.

    PubMed

    Hilmy, Nazly; Manjas, Menkher; Ferdiansyah; Abbas, Basril; Morales Pedraza, Jorge

    2009-05-01

    In 1986, the National Nuclear Energy Agency (Batan) in Jakarta started the research and development for the setting up of a tissue bank (Batan Research Tissue Bank/BRTB) by preserving fresh amnion or fetal membranes by lyophilisation and then sterilising by gamma irradiation. During the period of 1990 and 2000, three more tissue banks were set up, i.e., Biomaterial Centre in Surabaya, Jamil Tissue Bank in Padang, and Sitanala Tissue Bank in Tangerang. In 1994, BRTB produced bone allografts. The banks established under the IAEA program concentrated its work on the production of amnion, bone and soft tissues allografts, as well as bone xenografts. These tissues (allografts and xenografts) were sterilised using gamma irradiation (about 90%) and the rest were sterilized by ETO and those products have been used in the treatment of patients at more than 50 hospitals in Indonesia. In 2004, those tissue banks produced 8,500 grafts and 5,000 of them were amnion grafts for eye treatment and wound dressing. All of those grafts were used for patients as well as for research. In 2006, the production increased to 9,000 grafts. Although the capacity of those banks can produce more grafts, we are facing problems on getting raw materials from suitable donors. To fulfill the demand of bone grafts we also produced bone xenografts. The impact of the IAEA program in tissue banking activities in Indonesia can be summarised as follows: to support the national program on importing substitutes for medical devices. The price of imported tissues are between US$ 50 and US$ 6,000 per graft. Local tissue bank can produce tissues with the same quality with the price for about 10-30% of the imported tissues.

  2. Jazzing up the Psychological Contract

    ERIC Educational Resources Information Center

    Hartley, Nell Tabor

    2010-01-01

    Helping students and practitioners to understand and utilize the Psychological Contract is often a difficult task. Unlike fault-finding research, this paper presents the PC as a positive, vibrant and valuable tool. In an effort to make the concept less elusive, the paper draws upon the metaphor of jazz. The metaphor is an accepted tool of…

  3. Radiology equipment maintenance and contract procurement in the UK.

    PubMed

    Wright, Christopher J

    2012-01-01

    Radiology equipment maintenance has a similar financial value to new device acquisition over the lifetime of the device. Comprehensive style contracts are dominant largely due to their ease of use and the potential to control budgetary costs, but costs are high. Creative procurement solutions can offer better value. The corrective portion of comprehensive contracts is estimated to be between 50% (Mobile C-Arm) to 92% (CT), which equates to $29.4 million; 80% of the total contract costs within the research population of this study. Many organizations could free up cash by better managing their maintenance costs, potentially creating funding opportunities for new equipment.

  4. Research on air and missile defense task allocation based on extended contract net protocol

    NASA Astrophysics Data System (ADS)

    Zhang, Yunzhi; Wang, Gang

    2017-10-01

    Based on the background of air and missile defense distributed element corporative engagement, the interception task allocation problem of multiple weapon units with multiple targets under network condition is analyzed. Firstly, a mathematical model of task allocation is established by combat task decomposition. Secondly, the initialization assignment based on auction contract and the adjustment allocation scheme based on swap contract were introduced to the task allocation. Finally, through the simulation calculation of typical situation, the model can be used to solve the task allocation problem in complex combat environment.

  5. Chemical kinetics as a contract sport

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kolb, C.E.

    1990-01-01

    Earlier in this century chemical kinetics was a basic physical chemistry research topic widely pursued in leading academic chemistry departments. Chemical kinetics now appears to be a discipline practiced chiefly for its applications to societal problems. The chemical kinetics activities directed by D.M. Golden at SRI International are strikingly successful in generating data for key applied problems while at the same time advancing our understanding of chemical kinetics as a scientific discipline. In this talk, the author will contrast the chemical kinetics activities in two contract R D laboratories, one on the right side of the U.S. (ARI) and themore » other on the left (SRI). Their approach to common applied problems ranging from stratospheric heterogeneous kinetics to plasma etching systems for semiconductor processing will be compared and contrasted. Empirically discovered Golden Rules for the pursuit of quality chemical kinetics research in a contract R D environment will be presented and discussed.« less

  6. Psychological contract and organizational citizenship behavior in China: investigating generalizability and instrumentality.

    PubMed

    Hui, Chun; Lee, Cynthia; Rousseau, Denise M

    2004-04-01

    This study examined the generalizability of psychological contract forms observed in the West (D. M. Rousseau, 2000) to China. Using 2 independent samples, results confirmed the generalizability of 3 psychological contract forms: transactional, relational, and balanced. This study also examined the nature of relationships of psychological contracts with organizational citizenship behavior (OCB). In particular, this study explored the role of instrumentality as a mediating psychological process. The authors found evidence that instrumentality mediates the relationship of relational and balanced forms with OCB; however, the transactional contract form is directly related to OCB. The authors discuss the implications of these results for the meaning of psychological contracts and OCB in China and raise issues for future research.

  7. Multiyear Procurement (MYP) and Block Buy Contracting in Defense Acquisition: Background and Issues for Congress

    DTIC Science & Technology

    2016-03-23

    Multiyear Procurement (MYP) and Block Buy Contracting in Defense Acquisition: Background and Issues for Congress Ronald O’Rourke Specialist...Multiyear Procurement (MYP) and Block Buy Contracting in Defense Acquisition Congressional Research Service Summary Multiyear procurement (MYP) and... block buy contracting (BBC) are special contracting mechanisms that Congress permits the Department of Defense (DOD) to use for a limited number of

  8. Multiyear Procurement (MYP) and Block Buy Contracting in Defense Acquisition: Background and Issues for Congress

    DTIC Science & Technology

    2016-07-25

    Multiyear Procurement (MYP) and Block Buy Contracting in Defense Acquisition: Background and Issues for Congress Ronald O’Rourke Specialist...Multiyear Procurement (MYP) and Block Buy Contracting in Defense Acquisition Congressional Research Service Summary Multiyear procurement (MYP) and... block buy contracting (BBC) are special contracting mechanisms that Congress permits the Department of Defense (DOD) to use for a limited number of

  9. 48 CFR 204.470-3 - Contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF DEFENSE GENERAL ADMINISTRATIVE MATTERS Safeguarding Classified Information Within Industry 204... Protocol, in solicitations and contracts for research and development or major defense acquisition programs...) Other radiological source materials; or (c) Technologies directly related to nuclear power production...

  10. 48 CFR 204.470-3 - Contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF DEFENSE GENERAL ADMINISTRATIVE MATTERS Safeguarding Classified Information Within Industry 204... Protocol, in solicitations and contracts for research and development or major defense acquisition programs...) Other radiological source materials; or (c) Technologies directly related to nuclear power production...

  11. 48 CFR 204.470-3 - Contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF DEFENSE GENERAL ADMINISTRATIVE MATTERS Safeguarding Classified Information Within Industry 204... Protocol, in solicitations and contracts for research and development or major defense acquisition programs...) Other radiological source materials; or (c) Technologies directly related to nuclear power production...

  12. 48 CFR 204.470-3 - Contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF DEFENSE GENERAL ADMINISTRATIVE MATTERS Safeguarding Classified Information Within Industry 204... Protocol, in solicitations and contracts for research and development or major defense acquisition programs...) Other radiological source materials; or (c) Technologies directly related to nuclear power production...

  13. KY-CTDS : Kentucky contract time determination system

    DOT National Transportation Integrated Search

    2000-06-30

    This research project was to update the KyTC's planning tool used for the determination of contract time allotted for contractors to complete highway construction projects in the Commonwealth of Kentucky. Although this issue was initially raised by t...

  14. Numerical modeling of the radionuclide water pathway with HYDRUS and comparison with the IAEA model of SR 44.

    PubMed

    Merk, Rainer

    2012-02-01

    This study depicts a theoretical experiment in which the radionuclide transport through the porous material of a landfill consisting of concrete rubble (e.g., from the decommissioning of nuclear power plants) and the subsequent migration through the vadose zone and aquifer to a model well is calculated by means of the software HYDRUS-1D (Simunek et al., 2008). The radionuclides originally contained within the rubble become dissolved due to leaching caused by infiltrated rainwater. The resulting well-water contamination (in Bq/L) is calculated numerically as a function of time and location and compared with the outcome of a simplified analytic model for the groundwater pathway published by the IAEA (2005). Identical model parameters are considered. The main objective of the present work is to evaluate the predictive capacity of the more simple IAEA model using HYDRUS-1D as a reference. For most of the radionuclides considered (e.g., ¹²⁹I, and ²³⁹Pu), results from applying the IAEA model were found to be comparable to results from the more elaborate HYDRUS modeling, provided the underlying parameter values are comparable. However, the IAEA model appears to underestimate the effects resulting from, for example, high nuclide mobility, short half-life, or short-term variations in the water infiltration. The present results indicate that the IAEA model is suited for screening calculations and general recommendation purposes. However, the analysis of a specific site should be accompanied by detailed HYDRUS computer simulations. In all models considered, the calculation outcome largely depends on the choice of the sorption parameter K(d). Copyright © 2011 Elsevier Ltd. All rights reserved.

  15. Extending the Work of Cowen and Fowles: A Historical Analysis of Kentucky Teacher Contracts

    ERIC Educational Resources Information Center

    Ingle, W. Kyle; Wisman, R. Aaron

    2018-01-01

    We extend the work of Cowen and Fowles by examining contracts in Kentucky school districts with collective bargaining. Using document analysis, we sought to answer the following research question: Do key provisions of teacher contracts change over time? We also examine the most recently negotiated contract in Louisville schools (2013-2018). We…

  16. 48 CFR 1517.204 - Contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 6 2011-10-01 2011-10-01 false Contracts. 1517.204 Section 1517.204 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Options 1517.204 Contracts. The SCM may approve a...

  17. The effects of temporary agency work contract transitions on well-being.

    PubMed

    Chambel, Maria José; Lopes, Silvia; Batista, Josilene

    2016-11-01

    Theoretical and empirical research has provided mixed arguments and evidence for the effects of temporary agency work on workers' well-being. This study aims to go one critical step further by comparing the workplace and general well-being of workers who continue to have this employment status with others who obtain a direct contract and others who remain unemployed. Temporary agency workers longitudinal data (n = 289) was used, and three groups were compared: (1) maintaining a temporary agency contract (n = 187), (2) obtaining a direct contract (n = 57), and (3) remaining unemployed (n = 45). Covariance analyses adjusted for background variables showed that those who obtained a direct contract experienced a decrease in job insecurity but experienced an increase in job demands, while those who continued to have a temporary agency contract maintained these job conditions. However, in terms of workplace well-being, the temporary agency contract was not found to be more detrimental than a direct contract, but in terms of life satisfaction, unemployment was found to be more detrimental than other transitions. A temporary agency contract does not have an inevitable negative effect on workers' well-being.

  18. 48 CFR 1817.204 - Contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contracts. 1817.204 Section 1817.204 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION CONTRACTING METHODS AND CONTRACT TYPES SPECIAL CONTRACTING METHODS Options 1817.204 Contracts. (e)(i) The 5...

  19. The evolution and impact of the International Atomic Energy Agency (IAEA) program on radiation and tissue banking in Asia and the Pacific region.

    PubMed

    Morales Pedraza, Jorge; Phillips, Glyn O

    2009-05-01

    The Asia and the Pacific region was within the IAEA program on radiation and tissue banking, the most active region. Most of the tissue banks in the Asia and the Pacific region were developed during the late 1980s and 1990s. The initial number of tissue banks established or supported by the IAEA program in the framework of the RCA Agreement for Asia and the Pacific region was 18. At the end of 2006, the number of tissue banks participating, in one way or another in the IAEA program was 59. Since the beginning of the implementation of the IAEA program in Asia and the Pacific region 63,537 amnion and 44,282 bone allografts were produced and 57,683 amnion and 36,388 bone allografts were used. The main impact of the IAEA program in the region was the following: the establishment or consolidation of at least 59 tissue banks in 15 countries in the region (the IAEA supported directly 16 of these banks); the improvement on the quality and safety of tissues procured and produced in the region reaching international standards; the implementation of eight national projects, two regional projects and two interregional projects; the elaboration of International Standards, a Code of Practice and a Public Awareness Strategies and, the application of quality control and quality assurances programs in all participating tissue banks.

  20. Contracts. Warranties.

    ERIC Educational Resources Information Center

    Mertz, Gayle

    1988-01-01

    Presents two lesson plans for grades 5-9 which are meant to increase student's legal literacy. The first lesson covers contracts and includes a comic strip which illustrates contract law. The second deals with warranties and why they are important. Included are examples of product warranties. (GEA)

  1. Co-ordination of the International Network of Nuclear Structure and Decay Data Evaluators; Summary Report of an IAEA Technical Meeting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Abriola, D.; Tuli, J.

    The IAEA Nuclear Data Section convened the 18th meeting of the International Network of Nuclear Structure and Decay Data Evaluators at the IAEA Headquarters, Vienna, 23 to 27 March 2009. This meeting was attended by 22 scientists from 14 Member States, plus IAEA staff, concerned with the compilation, evaluation and dissemination of nuclear structure and decay data. A summary of the meeting, recommendations/conclusions, data centre reports, and various proposals considered, modified and agreed by the participants are contained within this document. The International Network of Nuclear Structure and Decay Data (NSDD) Evaluators holds biennial meetings under the auspices of themore » IAEA, and consists of evaluation groups and data service centres in several countries. This network has the objective of providing up-to-date nuclear structure and decay data for all known nuclides by evaluating all existing experimental data. Data resulting from this international evaluation collaboration is included in the Evaluated Nuclear Structure Data File (ENSDF) and published in the journals Nuclear Physics A and Nuclear Data Sheets (NDS).« less

  2. Toward a better understanding of psychological contract breach: a study of customer service employees.

    PubMed

    Deery, Stephen J; Iverson, Roderick D; Walsh, Janet T

    2006-01-01

    Experiences of psychological contract breach have been associated with a range of negative behavior. However, much of the research has focused on master of business administration alumni and managers and made use of self-reported outcomes. Studying a sample of customer service employees, the research found that psychological contract breach was related to lower organizational trust, which, in turn was associated with perceptions of less cooperative employment relations and higher levels of absenteeism. Furthermore, perceptions of external market pressures moderated the effect of psychological contract breach on absenteeism. The study indicated that psychological contract breach can arise when employees perceive discrepancies between an organization's espoused behavioral standards and its actual behavioral standards, and this can affect discretionary absence. (c) 2006 APA, all rights reserved.

  3. A review of the International Atomic Energy Agency (IAEA) international standards for tissue banks.

    PubMed

    Morales Pedraza, Jorge; Lobo Gajiwala, Astrid; Martinez Pardo, María Esther

    2012-03-01

    The IAEA International Standards for Tissue Banks published in 2003 were based on the Standards then currently in use in the USA and the European Union, among others, and reflect the best practices associated with the operation of a tissue bank. They cover legal, ethical and regulatory controls as well as requirements and procedures from donor selection and tissue retrieval to processing and distribution of finished tissue for clinical use. The application of these standards allows tissue banks to operate with the current good tissue practice, thereby providing grafts of high quality that satisfy the national and international demand for safe and biologically useful grafts. The objective of this article is to review the IAEA Standards and recommend new topics that could improve the current version.

  4. Contracting Practices for the Use and Operations of DoD-Sponsored Federally Funded Research and Development Centers.

    DTIC Science & Technology

    1994-12-02

    v *% OFFICE OF THE INSPECTOR GENERAL < SI 615 Z£L C O O+3 t "O -O £9 33 ɚ< CONTRACTING PRACTICES FOR THE USE AND OPERATIONS OF DOD...page was left out of orignial document V Part II - Findings and Recommendations ^ Finding A. Use of Federally Funded Research and Development...w> O ■2 ’» •« i«i sä « * s. fi v . § "ffi .silslH » to Jo 73 1 ■8 o u i 1 o § 1 .a i s I ~ 04 Z CM CM a **3 CM Si > s

  5. The development and validation of a psychological contract of safety scale.

    PubMed

    Walker, Arlene

    2010-08-01

    This paper builds on previous research by the author and describes the development and validation of a new measure of the psychological contract of safety. The psychological contract of safety is defined as the beliefs of individuals about reciprocal safety obligations inferred from implicit and explicit promises. A psychological contract is established when an individual believes that perceived employer and employee safety obligations are contingent on each other. A pilot test of the measure is first undertaken with participants from three different occupations: nurses, construction workers, and meat processing workers (N=99). Item analysis is used to refine the measure and provide initial validation of the scale. A larger validation study is then conducted with a participant sample of health care workers (N=424) to further refine the measure and to determine the psychometric properties of the scale. Item and correlational analyses produced the final employer and employee obligations scales, consisting of 21 and 17 items, respectively. Factor analyses identified two underlying dimensions in each scale comparable to that previously established in the organizational literature. These transactional and relational-type obligations provided construct validity of the scale. Internal consistency ratings using Cronbach's alpha found the components of the psychological contract of safety measure to be reliable. The refined and validated psychological contract of safety measure will allow investigation of the positive and negative outcomes associated with fulfilment and breach of the psychological contract of safety in future research. 2010 Elsevier Ltd. All rights reserved.

  6. 23 CFR 635.121 - Contract time and contract time extensions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... time extensions. (a) The STD should have adequate written procedures for the determination of contract... of the effective date of this Final Rule. (b) Contract time extensions granted by a STD shall be...

  7. 23 CFR 635.121 - Contract time and contract time extensions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... time extensions. (a) The STD should have adequate written procedures for the determination of contract... of the effective date of this Final Rule. (b) Contract time extensions granted by a STD shall be...

  8. 23 CFR 635.121 - Contract time and contract time extensions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... time extensions. (a) The STD should have adequate written procedures for the determination of contract... of the effective date of this Final Rule. (b) Contract time extensions granted by a STD shall be...

  9. 23 CFR 635.121 - Contract time and contract time extensions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... time extensions. (a) The STD should have adequate written procedures for the determination of contract... of the effective date of this Final Rule. (b) Contract time extensions granted by a STD shall be...

  10. Hedgehogs, Foxes, Ethics, and the Evolving Social Contract in Psychology.

    ERIC Educational Resources Information Center

    Rosnow, Ralph L.

    This paper discusses the importance of ethics in psychological research. It defines the social contract between psychological science and society as the responsibility not to do psychological or physical harm to any research participants and to do beneficial research in a way that will produce valid research. Also explored are ways in which…

  11. Service quality in contracted facilities.

    PubMed

    Rabbani, Fauziah; Pradhan, Nousheen Akber; Zaidi, Shehla; Azam, Syed Iqbal; Yousuf, Farheen

    2015-01-01

    The purpose of this paper is to explore the readiness of contracted and non-contracted first-level healthcare facilities in Pakistan to deliver quality maternal and neonatal health (MNH) care. A balanced scorecard (BSC) was used as the assessment framework. Using a cross-sectional study design, two rural health centers (RHCs) contracted out to Aga Khan Health Service, Pakistan were compared with four government managed RHCs. A BSC was designed to assess RHC readiness to deliver good quality MNH care. In total 20 indicators were developed, representing five BSC domains: health facility functionality, service provision, staff capacity, staff and patient satisfaction. Validated data collection tools were used to collect information. Pearson χ2, Fisher's Exact and the Mann-Whitney tests were applied as appropriate to detect significant service quality differences among the two facilities. Contracted facilities were generally found to be better than non-contracted facilities in all five BSC domains. Patients' inclination for facility-based delivery at contracted facilities was, however, significantly higher than non-contracted facilities (80 percent contracted vs 43 percent non-contracted, p=0.006). The study shows that contracting out initiatives have the potential to improve MNH care. This is the first study to compare MNH service delivery quality across contracted and non-contracted facilities using BSC as the assessment framework.

  12. ORNL Named as Part of IAES Research Reactor Hub

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The International Atomic Energy Agency (IAEA) has named ORNL and Idaho National Laboratory part of an International Centre based on Research Reactors. The designation makes the United States one of only three countries identified for unique capabilities and excellence in nuclear research.

  13. Compliance revisited: pharmaceutical drug trials in the era of the contract research organization.

    PubMed

    Jonvallen, Petra

    2009-12-01

    Over the past decade, the management of clinical trials of pharmaceuticals has become a veritable industry, as evidenced by the emergence and proliferation of contract research organizations (CROs) that co-ordinate and monitor trials. This article focuses on work performed by one CRO involved in the introduction of new software, modelled on industrial production processes, into clinical trial practices. It investigates how this new management technique relates to the work performed in the clinic to ensure that trial participants comply with the protocol. Using an analytical distinction between 'classical' management work and invisible work, the article contextualizes the meaning of compliance in the clinic and suggests that the work involved in producing compliance should be taken into consideration by those concerned with validity of trials, as clinical trials are put under private industrial management. The article builds on participant observation at a Swedish university hospital and interviews the nurses, dieticians, doctors and a software engineer, all part of a team involved in pharmaceutical drug trials on a potential obesity drug.

  14. Notification: Review of the Contract Management Assessment Program

    EPA Pesticide Factsheets

    Project #OA-FY14-0034, October 30, 2013. The Office of Inspector General plans to begin the preliminary research phase of an audit evaluating the Office of Acquisition Management’s Contract Management Assessment Program (CMAP).

  15. Experimental evaluation of honeycomb/screen configurations and short contraction section for NASA Lewis Research Center's altitude wind tunnel

    NASA Technical Reports Server (NTRS)

    Burley, Richard R.; Harrington, Douglas E.

    1987-01-01

    An experimental investigation was conducted in the high speed leg of the 0.1 scale model of the proposed Altitude Wind Tunnel to evaluate flow conditioner configurations in the settling chamber and their effect on the flow through the short contraction section. The lowest longitudinal turbulence intensity measured at the contraction-section entrance, 1.2%, was achieved with a honeycomb plus three fine-mesh screens. Turbulence intensity in the test section was estimated to be between 0.1 and 0.2% with the honeycomb plus three fine mesh screens in the settling chamber. Adding screens, however, adversely affected the total pressure profile, causing a small defect near the centerline at the contraction section entrance. No significant boundary layer separation was evident in the short contraction section.

  16. Managing Contraction.

    ERIC Educational Resources Information Center

    Taylor, William

    The major thesis of this paper on declining resources and enrollment is that the management of decline, or, as the author calls it, "contraction," is not simply an economic and technical problem; it is basically a conceptual and political one. The author first considers the effects of contraction on schools, buildings, and courses,…

  17. Employee contract issues for dermatologists.

    PubMed

    Brown, Christopher E; Indest, George F

    2013-12-01

    Employees and employers routinely face negotiating and preparing physician employment contracts. It is important for both sides to know and understand the basic information on what a comprehensive employment contract for a dermatologist should contain. There are various employment contract provisions from both the employee's perspective and the employer's perspective that must be considered when preparing physician employment contracts. This article provides basic advice and recommendations on requirements that should be included in such contracts. It suggests legal pitfalls that can be avoided through various contract clauses.

  18. NASA Extends Chandra Science and Operations Support Contract

    NASA Astrophysics Data System (ADS)

    2010-01-01

    NASA has extended a contract with the Smithsonian Astrophysical Observatory in Cambridge, Mass., to provide science and operational support for the Chandra X-ray Observatory, a powerful tool used to better understand the structure and evolution of the universe. The contract extension with the Smithsonian Astrophysical Observatory provides continued science and operations support to Chandra. This approximately 172 million modification brings the total value of the contract to approximately 545 million for the base effort. The base effort period of performance will continue through Sept. 30, 2013, except for the work associated with the administration of scientific research grants, which will extend through Feb. 28, 2016. The contract type is cost reimbursement with no fee. In addition to the base effort, the contract includes two options for three years each to extend the period of performance for an additional six years. Option 1 is priced at approximately 177 million and Option 2 at approximately 191 million, for a total possible contract value of about $913 million. The contract covers mission operations and data analysis, which includes observatory operations, science data processing and astronomer support. The operations tasks include monitoring the health and status of the observatory and developing and uplinking the observation sequences during Chandra's communication coverage periods. The science data processing tasks include the competitive selection, planning and coordination of science observations and processing and delivery of the resulting scientific data. NASA's Marshall Space Flight Center in Huntsville, Ala, manages the Chandra program for the agency's Science Mission Directorate in Washington. The Smithsonian Astrophysical Observatory controls Chandra's science and flight operations. For more information about the Chandra X-ray Observatory visit: http://chandra.nasa.gov

  19. The IAEA stopping power database, following the trends in stopping power of ions in matter

    NASA Astrophysics Data System (ADS)

    Montanari, C. C.; Dimitriou, P.

    2017-10-01

    The aim of this work is to present an overview of the state of art of the energy loss of ions in matter, based on the new developments in the stopping power database of the International Atomic Energy Agency (IAEA). This exhaustive collection of experimental data, graphs, programs and comparisons, is the legacy of Helmut Paul, who made it accessible to the global scientific community, and has been extensively employed in theoretical and experimental research during the last 25 years. The field of stopping power in matter is evolving, with new trends in materials of interest, including oxides, nitrides, polymers, and biological targets. Our goal is to identify areas of interest and emerging data needs to meet the requirements of a continuously developing user community.

  20. Department of Energy Efforts to Promote Universal Adherence to the IAEA Additional Protocol

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Killinger, Mark H.; Hansen, Linda H.; Kovacic, Don N.

    2009-10-06

    Entry-into-force of the U.S. Additional Protocol (AP) in January 2009 continues to demonstrate the ongoing commitment by the United States to promote universal adherence to the AP. The AP is a critical tool for improving the International Atomic Energy Agency’s (IAEA) capabilities to detect undeclared activities that indicate a clandestine nuclear weapons program. This is because States Parties are required to provide information about, and access to, nuclear fuel cycle activities beyond their traditional safeguards reporting requirements. As part of the U.S. AP Implementation Act and Senate Resolution of Ratification, the Administration is required to report annually to Congress onmore » measures taken to achieve the adoption of the AP in non-nuclear weapon states, as well as assistance to the IAEA to promote the effective implementation of APs in those states. A key U.S. effort in this area is being managed by the International Nuclear Safeguards and Engagement Program (INSEP) of the U.S. Department of Energy (DOE). Through new and existing bilateral cooperation agreements, INSEP has initiated technical assistance projects for AP implementation with selected non-weapon states. States with which INSEP is currently cooperating include Vietnam and Thailand, with Indonesia, Algeria, Morocco, and other countries as possible future collaborators in the area of AP implementation. The INSEP collaborative model begins with a joint assessment with our partners to identify specific needs they may have regarding entering the AP into force and any impediments to successful implementation. An action plan is then developed detailing and prioritizing the necessary joint activities. Such assistance may include: advice on developing legal frameworks and regulatory documents; workshops to promote understanding of AP requirements; training to determine possible declarable activities; assistance in developing a system to collect and submit declarations; performing industry

  1. Minority business bidding for local government contracts: the complexity of availability.

    PubMed

    Bangs, Ralph L; Murrell, Audrey; Constance-Huggins, Monique

    2007-01-01

    While minority-business enterprises (MBEs) have gained some access to local government contracts during the last three decades, these firms continue to receive a small share of local government contract spending relative to the number of available firms. Researchers have suggested two general explanations for the low representation of MBEs in contract awards: (1) lack of qualifications and capacity among MBEs, and (2) public and private discrimination against MBEs in contracting processes. This study on prime contract opportunities in a Northern central city and county with a large minority population finds that low bid rates greatly contribute to the low MBE shares of prime contracts and that bidding is reduced by both local government processes and characteristics of the firms. Some implications of these findings are that local governments need to: (1) monitor MBE shares of prime contract bids by size of contract and use share of bids as one measure of program and organizational effectiveness; (2) identify MBEs that are qualified for prime contracts and encourage and help interested firms to submit competitive bids; and (3) ensure that local government policies and practices do not diminish access to information about prime contract opportunities for qualified and interested minority firms. Another implication is that bidders lists should not be a primary basis for determining MBE availability, since many qualified and interested MBEs do not bid because of perceived barriers in local government.

  2. Contingency Contracting and Operant Behavior Change: An Exercise in Applied Behavior Analysis.

    ERIC Educational Resources Information Center

    Mann, Ronald A.

    Until recently, the use of contingency contracting has been largely an issue of theory and discussion with little experimental research evidence gathered to support efficacy. Two major reasons for this problem are suggested and discussed: (1) the concept of contingency contracting has not been adequately defined nor its minimal requirements…

  3. 48 CFR 235.006 - Contracting methods and contract type.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Defense (Acquisition, Technology, and Logistics) (USD(AT&L)) of an intent not to exercise a fixed-price... award a fixed-price type contract for a development program effort unless— (1) The level of program risk permits realistic pricing; (2) The use of a fixed-price type contract permits an equitable and sensible...

  4. A Group Counseling Contract.

    ERIC Educational Resources Information Center

    Johnson, Norbert; Johnson, Sarah Campbell

    1980-01-01

    A group counseling contract was developed following American Psychological Association ethical guidelines. The contract was effective in enabling participants to quickly become involved in group process. The contract could be modified for use by group facilitators in a variety of settings. (Author)

  5. 48 CFR 1846.470 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACT MANAGEMENT QUALITY ASSURANCE Government Contract Quality Assurance 1846.470 Contract clause. The contracting officer may insert a clause substantially as stated at 1852.246-71, Government Contract Quality Assurance Functions, in solicitations and contracts to specify the location(s) of quality assurance...

  6. 48 CFR 3416.307 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Contract clauses. 3416.307 Section 3416.307 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost-Reimbursement Contracts 3416.307 Contract...

  7. Contract portfolio optimization for a gasoline supply chain

    NASA Astrophysics Data System (ADS)

    Wang, Shanshan

    this model, we characterize a simple and easily implementable dynamic contract portfolio policy that would enable the company to dynamically rebalance its supply contract portfolio over time in anticipation of the future market conditions in each individual channel while satisfying the contractual obligations. The optimal policy is a state-dependent base-share contract portfolio policy characterized by a branded base-share level and an unbranded contract commitment combination, given as a function of the initial information state. Using real-world market data, we estimate the model parameters. We also apply an efficient modified policy iteration method to compute the optimal contract portfolio strategies and corresponding profit value. We present computational results in order to obtain insights into the structure of optimal policies, capture the value of the dynamic contract portfolio policy by comparing it with static policies, and illustrate the sensitivity of the optimal contract portfolio and corresponding profit value in terms of the different parameters. Considering the geographic dispersion of different market areas and the pipeline network together with the dynamic contract portfolio optimization problem, we formulate a forward-looking operational model, which could be used by gasoline suppliers for lower-level planning. Finally, we discuss the generalization of the framework to other problems and applications, as well as further research.

  8. 48 CFR 716.406 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Contract clauses. 716.406 Section 716.406 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost Reimbursement Contracts 716.406 Contract clauses. The...

  9. 48 CFR 716.406 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 716.406 Section 716.406 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Cost Reimbursement Contracts 716.406 Contract clauses. The...

  10. 48 CFR 3416.701 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Contract clause. 3416.701 Section 3416.701 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION CONTRACTING METHODS AND CONTRACT TYPES TYPES OF CONTRACTS Agreements 3416.701 Contract clause. The contracting...

  11. USU Contracts and Grants System--Innovative Inquiry.

    ERIC Educational Resources Information Center

    Henderson, Harold C.; Eagar, Virginia L.

    1981-01-01

    In January of 1979, the Contracts and Grants Office at Utah State University implemented a computerized system to keep track of pending research proposals, as well as active grants. The automation process used is described from its conception, design, and implementation to future enhancements. (Author/MLW)

  12. A Theory of Tenure-Track Contracts

    ERIC Educational Resources Information Center

    Cater, Bruce; Lew, Byron; Smith, Barry

    2008-01-01

    This paper offers an explanation of the use of tenure-track contracts in academia. It argues that, because the results of academic research cannot be sold, a professor's profitability depends on the market value of the instruction he or she provides. But because that value depends directly on the extent of his or her observable research…

  13. 48 CFR 17.204 - Contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... information technology contracts. However, statutes applicable to various classes of contracts, for example... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Contracts. 17.204 Section 17.204 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION CONTRACTING METHODS AND...

  14. 78 FR 11685 - Public Availability of FY 2011 Service Contract Inventory Analysis, FY 2012 Service Contract...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-19

    ... Analysis, FY 2012 Service Contract Inventory, and FY 2012 Service Contract Inventory Planned Analysis for... of the availability of the FY 2011 Service Contract Inventory Analysis, the FY 2012 Service Contract Inventory, and the FY 2012 Service Contract Inventory Planned Analysis. The FY 2011 inventory analysis...

  15. 24 CFR 232.605 - Contract requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Fire Safety Equipment Form of Contract § 232.605 Contract requirements. (a) The contract between the... contract. Either form of contract shall include the cost of fire safety equipment, its installation, and...

  16. 24 CFR 232.605 - Contract requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Fire Safety Equipment Form of Contract § 232.605 Contract requirements. (a) The contract between the... contract. Either form of contract shall include the cost of fire safety equipment, its installation, and...

  17. 24 CFR 232.605 - Contract requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Fire Safety Equipment Form of Contract § 232.605 Contract requirements. (a) The contract between the... contract. Either form of contract shall include the cost of fire safety equipment, its installation, and...

  18. 48 CFR 217.204 - Contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...)(i) Notwithstanding FAR 17.204(e), the ordering period of a task order or delivery order contract...) of this section does not apply to the following: (A) Contracts, including task or delivery order contracts, awarded under other statutory authority. (B) Advisory and assistance service task order contracts...

  19. Automatic Conflict Detection on Contracts

    NASA Astrophysics Data System (ADS)

    Fenech, Stephen; Pace, Gordon J.; Schneider, Gerardo

    Many software applications are based on collaborating, yet competing, agents or virtual organisations exchanging services. Contracts, expressing obligations, permissions and prohibitions of the different actors, can be used to protect the interests of the organisations engaged in such service exchange. However, the potentially dynamic composition of services with different contracts, and the combination of service contracts with local contracts can give rise to unexpected conflicts, exposing the need for automatic techniques for contract analysis. In this paper we look at automatic analysis techniques for contracts written in the contract language mathcal{CL}. We present a trace semantics of mathcal{CL} suitable for conflict analysis, and a decision procedure for detecting conflicts (together with its proof of soundness, completeness and termination). We also discuss its implementation and look into the applications of the contract analysis approach we present. These techniques are applied to a small case study of an airline check-in desk.

  20. 13 CFR 125.19 - When may a contracting officer set-aside a procurement for SDVO SBCs?

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... made at fair market price. Effective Date Note: At 75 FR 62281, Oct. 7, 2010, § 125.19 was amended by... market prices. This requirement does not preclude a contracting officer from setting aside a contract... fair market prices. However, after conducting market research, the contracting officer shall first...

  1. 7 CFR 634.25 - Contracting.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.25 Contracting... agrees to apply his or her water-quality plan. Any person who controls, or shares control, of the farm... basic contract document, special provisions as needed, the participant's water-quality plan, schedule of...

  2. 7 CFR 634.25 - Contracting.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.25 Contracting... agrees to apply his or her water-quality plan. Any person who controls, or shares control, of the farm... basic contract document, special provisions as needed, the participant's water-quality plan, schedule of...

  3. 7 CFR 634.25 - Contracting.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Participant RCWP Contracts § 634.25 Contracting... agrees to apply his or her water-quality plan. Any person who controls, or shares control, of the farm... basic contract document, special provisions as needed, the participant's water-quality plan, schedule of...

  4. The Joy of Contracts.

    ERIC Educational Resources Information Center

    Hegarty, Kevin

    This paper is a practical guide that explains and illustrates contracts between libraries and vendors for computerized circulation systems. It describes the elements of a typical contract to include the equipment and services that should be specified in the contract and establishes scheduling and acceptance testing needs. Included in a contract…

  5. Analysis of IAEA Environmental Samples for Plutonium and Uranium by ICP/MS in Support Of International Safeguards

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farmer, Orville T.; Olsen, Khris B.; Thomas, May-Lin P.

    2008-05-01

    A method for the separation and determination of total and isotopic uranium and plutonium by ICP-MS was developed for IAEA samples on cellulose-based media. Preparation of the IAEA samples involved a series of redox chemistries and separations using TRU® resin (Eichrom). The sample introduction system, an APEX nebulizer (Elemental Scientific, Inc), provided enhanced nebulization for a several-fold increase in sensitivity and reduction in background. Application of mass bias (ALPHA) correction factors greatly improved the precision of the data. By combining the enhancements of chemical separation, instrumentation and data processing, detection levels for uranium and plutonium approached high attogram levels.

  6. Hospice Agencies’ Hospital Contract Status and Differing Levels of Hospice Care

    PubMed Central

    Chung, Kyusuk; Richards, Nicole; Burke, Sloane C.

    2014-01-01

    In response to a 2011 finding that approximately 27% of Medicare-certified hospices do not provide a single day of general inpatient (GIP) level of care, the authors explored the extent to which hospices have contracts with hospitals for GIP. Using the 2007 National Home and Hospice Care Survey (NHHCS), we estimated that 1,119 agencies (32%) had no contract with any hospitals in 2007 and half of those with no contract did not have a contract with a skilled nursing facility (SNF) either. As a result, these hospices were unable to provide GIP patient referrals for those in need of inpatient care for acute pain and symptom management. More importantly, not having a contract with a hospital was just one of the factors influencing GIP provision. In the multivariate logistic model, after controlling for contract status with a hospital and other hospice characteristics, agencies in the second quartile of hospice patient census (12 to 29 vs. 73 or more, Adjusted OR=14.10; 95% CI: 4.26–46.62) were independently related to providing only routine home care. These hospices are more likely to rely solely on scatter beds for GIP provision. Given that a significant portion of hospices do not have a contract with a hospital, policy makers need to understand barriers to contracts with a hospital/SNF for GIP and consider a hospice’s contract status as one of the standards for hospice certification. In addition, further research is necessary to understand why hospices that do have a contract with a hospital do not make GIP referral. PMID:24576832

  7. Hospice agencies' hospital contract status and differing levels of hospice care.

    PubMed

    Chung, Kyusuk; Richards, Nicole; Burke, Sloane

    2015-05-01

    In response to a 2011 finding that approximately 27% of Medicare-certified hospices do not provide a single day of general inpatient care (GIP), the authors explored the extent to which hospices have contracts with hospitals for GIP. Using the 2007 National Home and Hospice Care Survey, we estimated that 1119 (32%) agencies had no contract with any hospitals in 2007 and half of those with no contract did not have a contract with a skilled nursing facility (SNF) either. As a result, these hospices were unable to provide GIP referrals for those in need of inpatient care for acute pain and symptom management. More importantly, not having a contract with a hospital was just one of the factors influencing GIP provision. In the multivariate logistic model, after controlling for contract status with a hospital and other hospice characteristics, agencies in the second quartile of hospice patient census (12-29 vs 73 or more, adjusted odds ratio = 14.10; 95% confidence interval 4.26-46.62) were independently related to providing only routine home care. These hospices are more likely to rely solely on scatter beds for GIP provision. Given that a significant portion of hospices do not have a contract with a hospital, policy makers need to understand barriers to contracts with a hospital/SNF for GIP and consider a hospice's contract status as one of the standards for hospice certification. In addition, further research is necessary to understand why hospices that do have a contract with a hospital do not make GIP referral. © The Author(s) 2014.

  8. Reference dosimeter system of the iaea

    NASA Astrophysics Data System (ADS)

    Mehta, Kishor; Girzikowsky, Reinhard

    1995-09-01

    Quality assurance programmes must be in operation at radiation processing facilities to satisfy national and international Standards. Since dosimetry has a vital function in these QA programmes, it is imperative that the dosimetry systems in use at these facilities are well calibrated with a traceability to a Primary Standard Dosimetry Laboratory. As a service to the Member States, the International Atomic Energy Agency operates the International Dose Assurance Service (IDAS) to assist in this process. The transfer standard dosimetry system that is used for this service is based on ESR spectrometry. The paper describes the activities undertaken at the IAEA Dosimetry Laboratory to establish the QA programme for its reference dosimetry system. There are four key elements of such a programme: quality assurance manual; calibration that is traceable to a Primary Standard Dosimetry Laboratory; a clear and detailed statement of uncertainty in the dose measurement; and, periodic quality audit.

  9. 48 CFR 632.705 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contract clauses. 632.705 Section 632.705 Federal Acquisition Regulations System DEPARTMENT OF STATE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Contract Funding 632.705 Contract clauses. ...

  10. 48 CFR 32.705 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contract clauses. 32.705 Section 32.705 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Contract Funding 32.705 Contract clauses. ...

  11. Testing the methodology for dosimetry audit of heterogeneity corrections and small MLC-shaped fields: Results of IAEA multi-center studies.

    PubMed

    Izewska, Joanna; Wesolowska, Paulina; Azangwe, Godfrey; Followill, David S; Thwaites, David I; Arib, Mehenna; Stefanic, Amalia; Viegas, Claudio; Suming, Luo; Ekendahl, Daniela; Bulski, Wojciech; Georg, Dietmar

    2016-07-01

    The International Atomic Energy Agency (IAEA) has a long tradition of supporting development of methodologies for national networks providing quality audits in radiotherapy. A series of co-ordinated research projects (CRPs) has been conducted by the IAEA since 1995 assisting national external audit groups developing national audit programs. The CRP 'Development of Quality Audits for Radiotherapy Dosimetry for Complex Treatment Techniques' was conducted in 2009-2012 as an extension of previously developed audit programs. The CRP work described in this paper focused on developing and testing two steps of dosimetry audit: verification of heterogeneity corrections, and treatment planning system (TPS) modeling of small MLC fields, which are important for the initial stages of complex radiation treatments, such as IMRT. The project involved development of a new solid slab phantom with heterogeneities containing special measurement inserts for thermoluminescent dosimeters (TLD) and radiochromic films. The phantom and the audit methodology has been developed at the IAEA and tested in multi-center studies involving the CRP participants. The results of multi-center testing of methodology for two steps of dosimetry audit show that the design of audit procedures is adequate and the methodology is feasible for meeting the audit objectives. A total of 97% TLD results in heterogeneity situations obtained in the study were within 3% and all results within 5% agreement with the TPS predicted doses. In contrast, only 64% small beam profiles were within 3 mm agreement between the TPS calculated and film measured doses. Film dosimetry results have highlighted some limitations in TPS modeling of small beam profiles in the direction of MLC leave movements. Through multi-center testing, any challenges or difficulties in the proposed audit methodology were identified, and the methodology improved. Using the experience of these studies, the participants could incorporate the auditing

  12. Defense Contract Management Agency

    Science.gov Websites

    , May 24. Click the photo above for more information. Members of the Defense Contract Management Agency for more information. Members of the Defense Contract Management Agency International Region conduct Skip to main content (Press Enter). Toggle navigation Defense Contract Management Agency Search

  13. Evaluation of narrow transverse contraction joints in jointed plain concrete pavements.

    DOT National Transportation Integrated Search

    2006-03-01

    This report presents the results of a research project conducted at the Louisiana Transportation Research Center (LTRC) to evaluate the performance of narrow transverse contraction joints to control cracking in jointed plain concrete pavements. In ad...

  14. 48 CFR 935.070 - Research misconduct.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Research misconduct. 935... CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 935.070 Research misconduct. (a) Applicability. The DOE research misconduct policy set forth at 10 CFR part 733 addresses research misconduct by individuals who...

  15. 48 CFR 935.070 - Research misconduct.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Research misconduct. 935... CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 935.070 Research misconduct. (a) Applicability. The DOE research misconduct policy set forth at 10 CFR part 733 addresses research misconduct by individuals who...

  16. 48 CFR 935.070 - Research misconduct.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Research misconduct. 935... CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 935.070 Research misconduct. (a) Applicability. The DOE research misconduct policy set forth at 10 CFR part 733 addresses research misconduct by individuals who...

  17. 48 CFR 935.070 - Research misconduct.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Research misconduct. 935... CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 935.070 Research misconduct. (a) Applicability. The DOE research misconduct policy set forth at 10 CFR part 733 addresses research misconduct by individuals who...

  18. 48 CFR 935.070 - Research misconduct.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Research misconduct. 935... CONTRACTING RESEARCH AND DEVELOPMENT CONTRACTING 935.070 Research misconduct. (a) Applicability. The DOE research misconduct policy set forth at 10 CFR part 733 addresses research misconduct by individuals who...

  19. An Analysis of Air Force Service Contract Cases Appealed to the Armed Services Board of Contract Appeals

    DTIC Science & Technology

    1988-09-01

    DEM/88S- 1 AN ANALYSIS OF AIR FORCE SERVICE CONTRACT CASES APPEALED TO THE ARMED SERVICES BOARD OF CONTRACT APPEALS THESIS Diane L. Bowden First...CONTRACT CASES APPEALED TO THE ARMED SERVICES BOARD OF CONTRACT APPEALS THESIS Presented to the Faculty of the School of Systems and Logistics of the Air...analyze, and condense information that might be useful to contracting and contract management personnel. Armed Services Board of Contract Appeals

  20. Advice for a career in academic gastroenterology: from fellowship application through job selection and contract negotiations to research and promotion.

    PubMed

    Cappell, M S

    2009-03-01

    This study aims to describe a comprehensive strategy for success in academic gastroenterology by reporting common sense, but mostly previously unpublished, recommendations. The recommendation are based on expert opinion from personal experience mentoring 125 gastroenterology fellows and residents as a program director for nine years and from mentoring research while publishing more than 160 articles in peer-reviewed journals and editing 11 books during a 23-year academic career. Primary criteria for fellowship applicant selection include board scores, clinical performance, interview performance, clinical training, and research productivity. For optimal chances, select the subspecialty of gastroenterology early during residency, consult a mentor, and develop a well-planned strategy. Faculty advancement depends upon publications, grants, national recognition, interpersonal skills, and recommendations. Article categories from highest-to-lowest in prestige are original investigations, review articles, book chapters, case reports, and letters/abstracts. Articles are judged by the prestige of the journal of publication. Resubmit rejected articles to successively less prestigious journals until accepted for publication. Articles in journals without peer-review have negligible career impact. Grant support creates protected time. Institutional reputation is important in academics. Do not accept a job without a written contract. Have a lawyer review your contract. An outside offer strengthens a negotiating position. Be sociable and nonconfrontational at work. Network with colleagues. Seek a mentor. Meet your supervisor regularly for feedback. Never express anger at your boss or patients. Avoid litigation with employers. Sub-subspecialize to develop expertise in one area. Focus on this area in your research and clinical practice. In conclusion, a well-planned strategy can help you achieve a senior academic position early and efficiently.

  1. 48 CFR 42.401 - Contract correspondence.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contract correspondence... MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Correspondence and Visits 42.401 Contract correspondence. (a) The contracting officer (or other contracting agency personnel) normally shall (1) forward...

  2. 48 CFR 1832.705 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract clauses. 1832.705 Section 1832.705 Federal Acquisition Regulations System NATIONAL AERONAUTICS AND SPACE ADMINISTRATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Contract Funding 1832.705 Contract clauses. ...

  3. 48 CFR 1242.7000 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 1242.7000 Section 1242.7000 Federal Acquisition Regulations System DEPARTMENT OF TRANSPORTATION CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Contract Administration Clauses 1242.7000 Contract...

  4. Development of a portable anchored dynamometer for collection of maximal voluntary isometric contractions in biomechanics research on dancers.

    PubMed

    Krasnow, Donna; Ambegaonkar, Jatin P; Stecyk, Shane; Wilmerding, M Virginia; Wyon, Matthew; Koutedakis, Yiannis

    2011-12-01

    Surface electromyography (sEMG) has been used in dance medicine research since the 1970s, but normalization procedures are not consistently employed in the field. The purpose of this project was to develop a portable anchored dynamometer (PAD) specifically for dance-related research. Due to the limited studies in the dance research literature using normalization procedures for sEMG data, a review of the procedures used in the exercise science literature was conducted. A portable anchored dynamometer was then developed and tested with dancers, using methods validated in previous literature. We collected sEMG maximum voluntary isometric contractions (MVIC, mV) from 10 female dancers (mean age 31.0 ± 15 yrs, mean height 163 ± 7.6 cm, mean weight 57.6 ± 6.9 kg, and 17.0 ± 13.9 yrs of training in ballet and/or modern dance) over three trials (5 sec each) for eight muscles bilaterally (quadriceps, tibialis anterior, abductor hallucis, gastrocnemius, hamstrings, gluteus maximus, erector spinae, and rectus abdominus). Consistency of data and feedback from dancers suggest that this dance-specific portable anchored dynamometer is effective for future sEMG studies in dance research.

  5. 48 CFR 846.312 - Construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Construction contracts. 846.312 Section 846.312 Federal Acquisition Regulations System DEPARTMENT OF VETERANS AFFAIRS CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 846.312 Construction contracts. The contracting officer shall...

  6. 48 CFR 543.205 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 543.205 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 543.205 Contract clauses. The contracting officer shall insert 552.243-71, Equitable Adjustments, in solicitations and contracts containing FAR 52.243-4, Changes. [74 FR...

  7. 7 CFR 1780.61 - Construction contracts.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 12 2013-01-01 2013-01-01 false Construction contracts. 1780.61 Section 1780.61..., Constructing and Inspections § 1780.61 Construction contracts. Contract documents must be sufficiently.... (a) Standard construction contract documents. If the construction contract documents utilized are not...

  8. 7 CFR 1780.61 - Construction contracts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 12 2012-01-01 2012-01-01 false Construction contracts. 1780.61 Section 1780.61..., Constructing and Inspections § 1780.61 Construction contracts. Contract documents must be sufficiently.... (a) Standard construction contract documents. If the construction contract documents utilized are not...

  9. 48 CFR 3443.106 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Contract clause. 3443.106 Section 3443.106 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION CONTRACT MANAGEMENT CONTRACT MODIFICATIONS 3443.106 Contract clause. The contracting officer shall insert...

  10. 48 CFR 543.205 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Section 543.205 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 543.205 Contract clauses. The contracting officer shall insert 552.243-71, Equitable Adjustments, in solicitations and contracts containing FAR 52.243-4, Changes. [74 FR...

  11. Caveats on Contract.

    ERIC Educational Resources Information Center

    Croxton, Tom A.

    1988-01-01

    Addresses concept of the therapeutic contract in clinical social work and psychotherapy. Defines "contract," describing legal implications, and implications for the professional relationship and course of treatment. Discusses mutuality, penalty clauses, voluntary participation in contractual process, malpractice and professional negligence,…

  12. 48 CFR 46.312 - Construction contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Construction contracts. 46... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.312 Construction contracts. The contracting officer shall insert the clause at 52.246-12, Inspection of Construction, in solicitations and contracts for...

  13. 48 CFR 46.312 - Construction contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Construction contracts. 46... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.312 Construction contracts. The contracting officer shall insert the clause at 52.246-12, Inspection of Construction, in solicitations and contracts for...

  14. 48 CFR 546.312 - Construction contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 4 2014-10-01 2014-10-01 false Construction contracts... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 546.312 Construction contracts. Insert the clause at 552.246-72, Final Inspection and Tests, in solicitations and contracts for construction that include...

  15. 48 CFR 546.312 - Construction contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Construction contracts... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 546.312 Construction contracts. Insert the clause at 552.246-72, Final Inspection and Tests, in solicitations and contracts for construction that include...

  16. 48 CFR 46.312 - Construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Construction contracts. 46... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.312 Construction contracts. The contracting officer shall insert the clause at 52.246-12, Inspection of Construction, in solicitations and contracts for...

  17. 48 CFR 546.312 - Construction contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Construction contracts... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 546.312 Construction contracts. Insert the clause at 552.246-72, Final Inspection and Tests, in solicitations and contracts for construction that include...

  18. 48 CFR 46.312 - Construction contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Construction contracts. 46... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.312 Construction contracts. The contracting officer shall insert the clause at 52.246-12, Inspection of Construction, in solicitations and contracts for...

  19. 48 CFR 546.312 - Construction contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 4 2012-10-01 2012-10-01 false Construction contracts... CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 546.312 Construction contracts. Insert the clause at 552.246-72, Final Inspection and Tests, in solicitations and contracts for construction that include...

  20. 48 CFR 46.314 - Transportation contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Transportation contracts... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.314 Transportation contracts. The contracting officer shall insert the clause at 52.246-14, Inspection of Transportation, in solicitations and contracts for freight...

  1. 48 CFR 46.314 - Transportation contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 1 2013-10-01 2013-10-01 false Transportation contracts... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.314 Transportation contracts. The contracting officer shall insert the clause at 52.246-14, Inspection of Transportation, in solicitations and contracts for freight...

  2. 48 CFR 46.314 - Transportation contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Transportation contracts... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.314 Transportation contracts. The contracting officer shall insert the clause at 52.246-14, Inspection of Transportation, in solicitations and contracts for freight...

  3. 48 CFR 46.314 - Transportation contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 1 2014-10-01 2014-10-01 false Transportation contracts... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.314 Transportation contracts. The contracting officer shall insert the clause at 52.246-14, Inspection of Transportation, in solicitations and contracts for freight...

  4. 48 CFR 46.314 - Transportation contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 1 2012-10-01 2012-10-01 false Transportation contracts... MANAGEMENT QUALITY ASSURANCE Contract Clauses 46.314 Transportation contracts. The contracting officer shall insert the clause at 52.246-14, Inspection of Transportation, in solicitations and contracts for freight...

  5. Affine Contractions on the Plane

    ERIC Educational Resources Information Center

    Celik, D.; Ozdemir, Y.; Ureyen, M.

    2007-01-01

    Contractions play a considerable role in the theory of fractals. However, it is not easy to find contractions which are not similitudes. In this study, it is shown by counter examples that an affine transformation of the plane carrying a given triangle onto another triangle may not be a contraction even if it contracts edges, heights or medians.…

  6. Army Contract Writing System (ACWS)

    DTIC Science & Technology

    2016-03-01

    2016 Major Automated Information System Annual Report Army Contract Writing System (ACWS) Defense Acquisition Management Information Retrieval...Program Information Program Name Army Contract Writing System (ACWS) DoD Component Army Responsible Office Program Manager References MAIS...UNCLASSIFIED 4 Program Description The Army Contract Writing System (ACWS) will be the Army’s single, next-generation, enterprise-wide contract writing

  7. Uterine Contraction Modeling and Simulation

    NASA Technical Reports Server (NTRS)

    Liu, Miao; Belfore, Lee A.; Shen, Yuzhong; Scerbo, Mark W.

    2010-01-01

    Building a training system for medical personnel to properly interpret fetal heart rate tracing requires developing accurate models that can relate various signal patterns to certain pathologies. In addition to modeling the fetal heart rate signal itself, the change of uterine pressure that bears strong relation to fetal heart rate and provides indications of maternal and fetal status should also be considered. In this work, we have developed a group of parametric models to simulate uterine contractions during labor and delivery. Through analysis of real patient records, we propose to model uterine contraction signals by three major components: regular contractions, impulsive noise caused by fetal movements, and low amplitude noise invoked by maternal breathing and measuring apparatus. The regular contractions are modeled by an asymmetric generalized Gaussian function and least squares estimation is used to compute the parameter values of the asymmetric generalized Gaussian function based on uterine contractions of real patients. Regular contractions are detected based on thresholding and derivative analysis of uterine contractions. Impulsive noise caused by fetal movements and low amplitude noise by maternal breathing and measuring apparatus are modeled by rational polynomial functions and Perlin noise, respectively. Experiment results show the synthesized uterine contractions can mimic the real uterine contractions realistically, demonstrating the effectiveness of the proposed algorithm.

  8. 13 CFR 126.607 - When must a contracting officer set aside a requirement for qualified HUBZone SBCs?

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... fair market prices. This requirement does not preclude a contracting officer from setting aside a... will be made at fair market prices. However, after conducting market research, the contracting officer... to support the specific set-aside, including the type and extent of market research conducted. In...

  9. Contract Design, Supply Chain Complexity, and Accountability in Federal Contracts

    DTIC Science & Technology

    2016-04-30

    understanding how organizations, policy makers, and citizens use information to make decisions and influence public and organizational policy. He has...qÜáêíÉÉåíÜ=^ååì~ä= ^Åèìáëáíáçå=oÉëÉ~êÅÜ= póãéçëáìã= qÜìêëÇ~ó=pÉëëáçåë= sçäìãÉ=ff= = Contract Design, Supply Chain Complexity, and Accountability in Federal...Executive Officer, PEO IEW&S Contract Design, Supply Chain Complexity, and Accountability in Federal Contracts Adam Eckerd, Assistant Professor

  10. Secretary of Energy Steven Chu speaks to the 2009 IAEA General Conference delegation

    ScienceCinema

    Secretary Chu

    2017-12-09

    On Sept. 14, 2009, U.S. Secretary of Energy Steven Chu addressed the 2009 IAEA General Conference delegation. Chu is the first Cabinet official to discuss President Obama's nuclear security and nonproliferation agenda outside the United States since the President delivered his landmark speech in Prague in April 2009.

  11. 25 CFR 502.15 - Management contract.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 2 2013-04-01 2013-04-01 false Management contract. 502.15 Section 502.15 Indians... CHAPTER § 502.15 Management contract. Management contract means any contract, subcontract, or collateral... contract or agreement provides for the management of all or part of a gaming operation. ...

  12. 25 CFR 502.15 - Management contract.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 2 2011-04-01 2011-04-01 false Management contract. 502.15 Section 502.15 Indians... CHAPTER § 502.15 Management contract. Management contract means any contract, subcontract, or collateral... contract or agreement provides for the management of all or part of a gaming operation. ...

  13. 25 CFR 502.15 - Management contract.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 2 2012-04-01 2012-04-01 false Management contract. 502.15 Section 502.15 Indians... CHAPTER § 502.15 Management contract. Management contract means any contract, subcontract, or collateral... contract or agreement provides for the management of all or part of a gaming operation. ...

  14. 48 CFR 37.304 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Contract clauses. 37.304... CONTRACTING SERVICE CONTRACTING Dismantling, Demolition, or Removal of Improvements 37.304 Contract clauses. (a) The contracting officer shall insert the clause at 52.237-4, Payment by Government to Contractor...

  15. 25 CFR 502.15 - Management contract.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Management contract. 502.15 Section 502.15 Indians... CHAPTER § 502.15 Management contract. Management contract means any contract, subcontract, or collateral... contract or agreement provides for the management of all or part of a gaming operation. ...

  16. 24 CFR 232.605 - Contract requirements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... MORTGAGE INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND ASSISTED... Fire Safety Equipment Form of Contract § 232.605 Contract requirements. (a) The contract between the... contract. Either form of contract shall include the cost of fire safety equipment, its installation, and...

  17. 48 CFR 52.222-48 - Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment....222-48 Exemption from Application of the Service Contract Act to Contracts for Maintenance... following provision: Exemption From Application of the Service Contract Act to Contracts for Maintenance...

  18. 48 CFR 52.222-51 - Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment....222-51 Exemption from Application of the Service Contract Act to Contracts for Maintenance... clause: Exemption From Application of the Service Contract Act to Contracts for Maintenance, Calibration...

  19. Surface transportation : prospects for innovation through research, intelligent transportation systems, state infrastructure banks, and design-build contracting : testimony before the Subcommittee on Transportation and Infrastructure, Committee on Environ

    DOT National Transportation Integrated Search

    1997-03-06

    This testimony describes how innovation in federal research, financing and contracting methods has the potential for improving the performance of the nation's surface transportation system. The testimony is based on three reports on the reauthorizati...

  20. Building America Energy Renovations. A Business Case for Home Performance Contracting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baechler, Michael C.; Antonopoulos, C. A.; Sevigny, M.

    2012-10-01

    This research report gives an overview of the needs and opportunities that exist in the U.S. home performance contracting industry. The report discusses industry trends, market drivers, different business models, and points of entry for existing and new businesses hoping to enter the home performance contracting industry. Case studies of eight companies who successfully entered the industry are provided, including business metrics, start-up costs, and marketing approaches.

  1. Semantic processing in the left versus right cerebral hemispheres following unilateral hand contractions.

    PubMed

    Turner, Casey E; Hahn, Michael E; Kellogg, Ronald T

    2017-03-01

    Unilateral hand contractions increase activation in the motor cortex of the contralateral hemisphere, providing a means to alter the relative degree of activation in the right hemisphere versus the left hemisphere through spreading activation. Prior research reported enhanced verbal creativity as measured by performance on remote associate problems in Hebrew from left-hand contractions (right-hemisphere activation). We sought to extend the previous findings to English problems and to homograph interpretation. In Experiment 1, unilateral hand contractions in fact altered performance on the English remote associates, but in the direction of improved performance following right-hand contractions and left-hemisphere activation. In Experiment 2, the probability of retrieving atypical interpretations of homographs with multiple meanings was least likely for left-hemisphere dominant strong right handers, but the hand contraction manipulation had no effect.

  2. 24 CFR 891.560 - HAP contract.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false HAP contract. 891.560 Section 891... Assistance § 891.560 HAP contract. (a) HAP contract. The housing assistance payments contract sets forth.... (b) HAP contract execution. (1) Upon satisfactory completion of the project, the Borrower and HUD...

  3. Synthesis of innovative contracting strategies for routine and preventive maintenance contracts.

    DOT National Transportation Integrated Search

    2010-02-01

    TxDOT is faced with a need to expand their maintenance contracted services due to shortage of in-house : personnel and expertise. As a result, TxDOT had a need to investigate maintenance contracting strategies to : identify those efficient strategies...

  4. 48 CFR 35.015 - Contracts for research with educational institutions and nonprofit organizations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... management capabilities, and (B) the contractor's estimate of the amount of time that individual will devote... obtain the contracting officer's approval to change the phenomenon under study, the stated objectives of... and approval over the avenues of approach, methods, or schedule of work. (b) Basic agreements. (1) A...

  5. 48 CFR 35.015 - Contracts for research with educational institutions and nonprofit organizations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... management capabilities, and (B) the contractor's estimate of the amount of time that individual will devote... obtain the contracting officer's approval to change the phenomenon under study, the stated objectives of... and approval over the avenues of approach, methods, or schedule of work. (b) Basic agreements. (1) A...

  6. 48 CFR 52.222-52 - Exemption from Application of the Service Contract Act to Contracts for Certain Services...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of the Service Contract Act to Contracts for Certain Services-Certification. 52.222-52 Section 52.222... from Application of the Service Contract Act to Contracts for Certain Services—Certification. As... Contract Act to Contracts for Certain Services—Certification (NOV 2007) (a) The offeror shall check the...

  7. 48 CFR 16.203-4 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... AND CONTRACT TYPES TYPES OF CONTRACTS Fixed-Price Contracts 16.203-4 Contract clauses. (a) Adjustment... must agree in writing on the identity of the standard supplies and the corresponding contract line...) The contracting officer shall describe in detail in the contract Schedule— (i) The types of labor and...

  8. 46 CFR 190.15-90 - Vessels contracted for prior to March 1, 1968.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Vessels contracted for prior to March 1, 1968. 190.15-90 Section 190.15-90 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS CONSTRUCTION AND ARRANGEMENT Ventilation § 190.15-90 Vessels contracted for prior to March 1, 1968...

  9. 46 CFR 190.10-90 - Vessels contracted for prior to March 1, 1968.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Vessels contracted for prior to March 1, 1968. 190.10-90 Section 190.10-90 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OCEANOGRAPHIC RESEARCH VESSELS CONSTRUCTION AND ARRANGEMENT Means of Escape § 190.10-90 Vessels contracted for prior to March 1...

  10. [The contracting process and outsourcing in health: the scenario for dispute between public and private interests].

    PubMed

    Albuquerque, Maria do Socorro Veloso; Morais, Heloísa Maria Mendonça de; Lima, Luci Praciano

    2015-06-01

    This research analyzed the public-private composition in the municipal health network and aspects of the contracting/outsourcing process for services over the period from 2001 to 2008. The research method used was a case study with documentary research and interviews. The interviewees were former secretaries of health, directors of regulation and district managers. The categories of analysis used were public funds, care networks and public control. The results showed that the contracting was restricted to philanthropic units. With respect to the other private establishments linked to the public care network, non-compliance with programmatic aspects was detected, such as the lack of regulation of bidding processes required for contracting. Management authorities did not actively pursue building up state public services, or the formation of care networks. The contracted establishments conducted their activities without effective external and internal control mechanisms, which are paramount for the proper use of public resources. The authors conclude that the contracting process does not significantly alter the standard of buying and selling of services and indeed does not enhance the empowering process of the role of the public domain.

  11. Dynamics of myosin-driven skeletal muscle contraction: I. Steady-state force generation.

    PubMed

    Lan, Ganhui; Sun, Sean X

    2005-06-01

    Skeletal muscle contraction is a canonical example of motor-driven force generation. Despite the long history of research in this topic, a mechanistic explanation of the collective myosin force generation is lacking. We present a theoretical model of muscle contraction based on the conformational movements of individual myosins and experimentally measured chemical rate constants. Detailed mechanics of the myosin motor and the geometry of the sarcomere are taken into account. Two possible scenarios of force generation are examined. We find only one of the scenarios can give rise to a plausible contraction mechanism. We propose that the synchrony in muscle contraction is due to a force-dependent ADP release step. Computational results of a half sarcomere with 150 myosin heads can explain the experimentally measured force-velocity relationship and efficiency data. We predict that the number of working myosin motors increases as the load force is increased, thus showing synchrony among myosin motors during muscle contraction. We also find that titin molecules anchoring the thick filament are passive force generators in assisting muscle contraction.

  12. Dynamics of Myosin-Driven Skeletal Muscle Contraction: I. Steady-State Force Generation

    PubMed Central

    Lan, Ganhui; Sun, Sean X.

    2005-01-01

    Skeletal muscle contraction is a canonical example of motor-driven force generation. Despite the long history of research in this topic, a mechanistic explanation of the collective myosin force generation is lacking. We present a theoretical model of muscle contraction based on the conformational movements of individual myosins and experimentally measured chemical rate constants. Detailed mechanics of the myosin motor and the geometry of the sarcomere are taken into account. Two possible scenarios of force generation are examined. We find only one of the scenarios can give rise to a plausible contraction mechanism. We propose that the synchrony in muscle contraction is due to a force-dependent ADP release step. Computational results of a half sarcomere with 150 myosin heads can explain the experimentally measured force-velocity relationship and efficiency data. We predict that the number of working myosin motors increases as the load force is increased, thus showing synchrony among myosin motors during muscle contraction. We also find that titin molecules anchoring the thick filament are passive force generators in assisting muscle contraction. PMID:15778440

  13. High-current discharge channel contraction in high density gas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rutberg, Ph. G.; Bogomaz, A. A.; Pinchuk, M. E.

    Research results for discharges at current amplitudes of 0.5-1.6 MA and current rise rate of {approx}10{sup 10} A/s are presented. The discharge is performed in the hydrogen environment at the initial pressure of 5-35 MPa. Initiation is implemented by a wire explosion. The time length of the first half-period of the discharge current is 70-150 {mu}s. Under such conditions, discharge channel contraction is observed; the contraction is followed by soft x-ray radiation. The phenomena are discussed, which are determined by high density of the gas surrounding the discharge channel. These phenomena are increase of the current critical value, where themore » channel contraction begins and growth of temperature in the axis region of the channel, where the initial density of the gas increases.« less

  14. Quality of radiotherapy services in post-Soviet countries: An IAEA survey.

    PubMed

    Rosenblatt, Eduardo; Fidarova, Elena; Ghosh, Sunita; Zubizarreta, Eduardo; Unterkirhere, Olga; Semikoz, Natalia; Sinaika, Valery; Kim, Viktor; Karamyan, Nerses; Isayev, Isa; Akbarov, Kamal; Lomidze, Darejan; Bondareva, Oksana; Tuzlucov, Piotr; Zardodkhonova, Manzura; Tkachev, Sergey; Kislyakova, Marina; Alimov, Jamshid; Pidlubna, Tetiana; Barton, Michael; Mackillop, William

    2018-04-25

    The quality of radiotherapy services in post-Soviet countries has not yet been studied following a formal methodology. The IAEA conducted a survey using two sets of validated radiation oncology quality indicators (ROIs). Eleven post-Soviet countries were assessed. A coordinator was designated for each country and acted as the liaison between the country and the IAEA. The methodology was a one-time cross-sectional survey using a 58-question tool in Russian. The questionnaire was based on two validated sets of ROIs: for radiotherapy centres, the indicators proposed by Cionini et al., and for data at the country level, the Australasian ROIs. The overall response ratio was 66.3%, but for the Russian Federation, it was 24%. Data were updated on radiotherapy infrastructure and equipment. 256 radiotherapy centres are operating 275 linear accelerators and 337 Cobalt-60 units. 61% of teletherapy machines are older than ten years. Analysis of ROIs revealed significant differences between these countries and radiotherapy practices in the West. Naming, task profile and education programmes of radiotherapy professionals are different than in the West. Most countries need modernization of their radiotherapy infrastructure coupled with adequate staffing numbers and updated education programmes focusing on evidence-based medicine, quality, and safety. Copyright © 2018 Elsevier B.V. All rights reserved.

  15. Effect of Contract Research Organization Bureaucracy in Clinical Trial Management: A Model From Lung Cancer.

    PubMed

    Gobbini, Elisa; Pilotto, Sara; Pasello, Giulia; Polo, Valentina; Di Maio, Massimo; Arizio, Francesca; Galetta, Domenico; Petrillo, Patrizia; Chiari, Rita; Matocci, Roberta; Di Costanzo, Alessandro; Di Stefano, Teresa Severina; Aglietta, Massimo; Cagnazzo, Celeste; Sperduti, Isabella; Bria, Emilio; Novello, Silvia

    2018-03-01

    Contract research organization (CRO) support is largely included in clinical trial management, although its effect in terms of time savings and benefit has not yet been quantified. We performed a retrospective multicenter analysis of lung cancer trials to explore differences in term of trial activation timelines and accrual for studies with and without CRO involvement. Results regarding study timelines from feasibility data to first patient enrollment were collected from 7 Italian thoracic oncology departments. The final accruals (screened/enrolled patients) are reported. We considered CRO/sponsor-administered and CRO-free trials according to who was responsible for the management of the crucial setup phases. Of 113 trials, 62 (54.9%) were CRO-administered, 34 (30.1%) were sponsor-administered, and 17 (15.0%) were CRO-free. The median time from feasibility invitation to documentation obtainment was 151 days in the CRO-administered trials versus 128 in the sponsor-administered and 120 in the CRO-free trials. The time from document submission to contract signature was 142 days in the CRO-administered versus 128 in the sponsor-administered and 132 in the CRO-free trials. The time from global accrual opening to first patient enrollment was 247 days for the CRO-administered versus 194 in the sponsor-administered and 151 in the CRO-free trials. No significant differences were observed in terms of the median overall timeline: 21 months in the CRO-administered, 15 in the sponsor-administered, and 18 months in the CRO-free studies (P = .29). Although no statistically significant differences were identified, the results of our analysis support the idea that bureaucratic procedures might require more time in CRO-administered trials than in sponsor-administered and CRO-free studies. This bureaucratic delay could negatively affect Italian patients' screening and enrollment compared with other countries. Copyright © 2017 Elsevier Inc. All rights reserved.

  16. 29 CFR 4.107 - Federal contracts.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 1 2011-07-01 2011-07-01 false Federal contracts. 4.107 Section 4.107 Labor Office of the Secretary of Labor LABOR STANDARDS FOR FEDERAL SERVICE CONTRACTS Application of the McNamara-O'Hara Service Contract Act Agencies Whose Contracts May Be Covered § 4.107 Federal contracts. (a) Section 2(a) of the Act...

  17. Nuclear and isotopic techniques applied to supporting nutritional studies in East Asia and Pacific Countries: IAEA's contributions over 20 years.

    PubMed

    Kim, Seong-Ai; Miranda-da-Cruz, B; Mokhtar, Najat; Iyengar, Venkatesh

    2004-01-01

    The world's scientific community has recognized that isotopic techniques play a vital role in monitoring the effectiveness of nutrition intervention by providing precise data on absorption, bioavailablity and interaction of various micronutrients in a cost effective manner. The International Atomic Energy Agency (IAEA) has been supporting many such health related studies in Member States from developing countries using nuclear and isotopic methods for over 20 years. This report documents the Agency's support for a variety of projects in East Asia and Pacific countries to assess body composition, total energy expenditure, nutrient intake, osteoporosis, infection, vitamin and mineral bioavailability as well as food composition. The IAEA spent a total of 10,302,356 US dollars through Coordinated Research Projects (CRP) and Technical Cooperation Projects (TCP) over the past 20 years. Out of this only 2,732,802, US dollars or 26.5% was used by the East Asia and Pacific countries. While the participation of East Asia and Pacific countries was strong in CRPs and moderate in regional TCPs, they did not participate in national TCPs at all. The non-participation under national TCPs is a serious deficiency when compared with Latin American and African regions and therefore, more participation from the East Asia and Pacific countries in national TCPs is strongly encouraged in the future.

  18. An Assessment of Factors that Affect the Employment of Alternative Dispute Resolution Techniques to Resolve Contract Disputes

    DTIC Science & Technology

    1994-09-01

    Robert Strasser, professors of Contract Law at AFIT, who offered expertise, guidance and resources that were instrumental for successful completion of...users (SAF/GC, AFRT Contract Law Department, ACUS, several law firms, and senior contracting, legal 18 and engineering professionals from the Air Force...survey for format and design. The two other research advisors, ADR and Contract Law course professors at AFIT, primarily reviewed the survey for content

  19. Contract Financing for Small Business

    DTIC Science & Technology

    1981-11-01

    problem. Small business contractors devote considerable management attention to operating capital and cash flow. Small business contractors are keenly...CONTRACT FINANCING 0FOR SMALL BUSINESS November 1981 -s Paul R. McClenon Prepared pursuant to Department of Defense Contract No. MDA903-81-C-0166...34 i 12 17046 DistIbufios Unlimted !I CONTRACT FINANCING FOR SMALL BUSINESS EXECUTIVE SUMMHARY To perform effectively on a contract, a firm needs

  20. 7 CFR 631.10 - Contracts.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... for the life of the proposed contract. (b) Contracts may be entered into not later than September 30... the conservation plan and must extend at least 3 years but not more than 10 years. (c) Contracts may...

  1. 7 CFR 631.10 - Contracts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... for the life of the proposed contract. (b) Contracts may be entered into not later than September 30... the conservation plan and must extend at least 3 years but not more than 10 years. (c) Contracts may...

  2. Contracting for Change

    ERIC Educational Resources Information Center

    Scholtes, Peter R.

    1975-01-01

    An organizational workshop for staff members focused on organizational change through identification of problems, one-to-one communication, and the writing of contracts for behavioral change. Contract forming assists members to agree on definition of problems, to involve and commit themselves, and to define processes for change. (EA)

  3. Whither Performance Contracting?

    ERIC Educational Resources Information Center

    Green, Norman S.

    This report describes briefly performance contracts; discusses their shortcomings, pitfalls, and advantages; and gives some insight into the future development of this new concept. Two shortcomings of performance contracting include (1) teaching to the test and (2) board abdication of its responsibility for making final decisions about educational…

  4. 17 CFR Appendix B to Part 43 - Enumerated Physical Commodity Contracts and Other Contracts

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 17 Commodity and Securities Exchanges 1 2012-04-01 2012-04-01 false Enumerated Physical Commodity... TRADING COMMISSION REAL-TIME PUBLIC REPORTING Pt. 43, App. B Appendix B to Part 43—Enumerated Physical Commodity Contracts and Other Contracts Enumerated Physical Commodity Contracts Agriculture ICE Futures U.S...

  5. Contract Research, Curricular Reform, and Situated Selves: Between Social Justice and Commercialized Knowledge

    ERIC Educational Resources Information Center

    Sturges, Keith M.

    2014-01-01

    Using a critical ethnographic perspective, I describe how social scientists actively transition into the evaluation industry in a reform environment that is marked by increased privatization of all aspects of public education. I do this by exploring adaptations that contract evaluators use to enhance a sense of personal connection to their work…

  6. 48 CFR 32.114 - Unusual contract financing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Unusual contract financing... CONTRACTING REQUIREMENTS CONTRACT FINANCING Non-Commercial Item Purchase Financing 32.114 Unusual contract financing. Any contract financing arrangement that deviates from this part is unusual contract financing...

  7. 15 years in promoting the use of isotopic and nuclear technique for combating land degradation and soil erosion: the contribution of the Joint FAO/IAEA Division of Nuclear Techniques in Food and Agriculture

    NASA Astrophysics Data System (ADS)

    Mabit, Lionel; Toloza, Arsenio; Heng, Lee

    2017-04-01

    Techniques in Food and Agriculture has developed research and development activities and capacity building to combat soil degradation (especially soil erosion) and to foster climate smart agriculture. More than 70 FAO/IAEA Member States have benefitted from the technical support and guidance in using fallout radionuclides (FRNs) and Compound-Specific Stable Isotope (CSSI) techniques to trace soil movement and assess soil erosion at different spatial and temporal scales, and to evaluate the effectiveness of soil conservation strategies to ensure sustainable land management. This contribution summarizes the historical background and the latest innovative activities conducted by the Joint FAO/IAEA Division, as well as the main advantages and complementarity of stable and radioisotopic tracers to conventional techniques when investigating land degradation. As examples of the significant role played by the Joint FAO/IAEA Division, two major outcomes achieved in Africa (i.e. Madagascar and Morocco) through the use of isotopic and nuclear techniques will be elaborated. The authors will also report on a new 5-year Co-ordinated Research Project (CRP) funded by the IAEA on "Nuclear Techniques for a Better Understanding of the Impact of Climate Change on Soil Erosion in Upland Agro-ecosystems" which involves key research institutions from 12 participating countries.

  8. Defense Procurement: An Analysis of Contract Management Internal Controls

    DTIC Science & Technology

    2015-03-22

    monitoring activities component of the internal control framework. Acquisition Research Program Graduate School of Business & Public Policy - 7...Research Program Graduate School of Business & Public Policy - 24 - Naval Postgraduate School Tan, L. H. J. (2013). An analysis of internal controls and...Naval Postgraduate School, Monterey, CA 93943. Defense Procurement: An Analysis of Contract Management Internal Controls 22 March 2015 Dr. Juanita

  9. 48 CFR 342.7102 - Contract modifications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Contract modifications. 342.7102 Section 342.7102 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Administrative Actions for Cost Overruns 342.7102 Contract modifications...

  10. 48 CFR 1632.617 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Contract clause. 1632.617 Section 1632.617 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Contract Debts...

  11. 48 CFR 1632.617 - Contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Contract clause. 1632.617 Section 1632.617 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Contract Debts...

  12. 48 CFR 342.7101 - Contract administration.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 4 2013-10-01 2013-10-01 false Contract administration. 342.7101 Section 342.7101 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Administrative Actions for Cost Overruns 342.7101 Contract administration. ...

  13. 48 CFR 1632.772 - Contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 6 2012-10-01 2012-10-01 false Contract clause. 1632.772 Section 1632.772 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Contract...

  14. 48 CFR 1632.617 - Contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 6 2014-10-01 2014-10-01 false Contract clause. 1632.617 Section 1632.617 Federal Acquisition Regulations System OFFICE OF PERSONNEL MANAGEMENT FEDERAL EMPLOYEES HEALTH BENEFITS ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Contract Debts...

  15. 48 CFR 546.312 - Construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Construction contracts. 546.312 Section 546.312 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION CONTRACT MANAGEMENT QUALITY ASSURANCE Contract Clauses 546.312 Construction contracts. Insert the clause at...

  16. 48 CFR 243.205 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contract clauses. 243.205 Section 243.205 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.205 Contract clauses. ...

  17. 48 CFR 342.7101 - Contract administration.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Contract administration. 342.7101 Section 342.7101 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Administrative Actions for Cost Overruns 342.7101 Contract administration. ...

  18. 48 CFR 342.7102 - Contract modifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 4 2011-10-01 2011-10-01 false Contract modifications. 342.7102 Section 342.7102 Federal Acquisition Regulations System HEALTH AND HUMAN SERVICES CONTRACT MANAGEMENT CONTRACT ADMINISTRATION Administrative Actions for Cost Overruns 342.7102 Contract modifications...

  19. 48 CFR 542.1107 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 4 2010-10-01 2010-10-01 false Contract clause. 542.1107 Section 542.1107 Federal Acquisition Regulations System GENERAL SERVICES ADMINISTRATION CONTRACT MANAGEMENT CONTRACT ADMINISTRATION AND AUDIT SERVICES Production Surveillance and Reporting 542.1107 Contract...

  20. 48 CFR 243.205 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Contract clauses. 243.205 Section 243.205 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 243.205 Contract clauses. ...

  1. 48 CFR 1509.507-2 - Contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) solicitations and contracts, except Site Specific solicitations and contracts. The term “RAC” in the Limitation of Future Contracting clauses includes not only RAC solicitations and contracts but other long term..., except site specific solicitations and contracts. The term “ERRS” in the Limitation of Future Contracting...

  2. 48 CFR 1509.507-2 - Contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) solicitations and contracts, except Site Specific solicitations and contracts. The term “RAC” in the Limitation of Future Contracting clauses includes not only RAC solicitations and contracts but other long term..., except site specific solicitations and contracts. The term “ERRS” in the Limitation of Future Contracting...

  3. 48 CFR 1509.507-2 - Contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) solicitations and contracts, except Site Specific solicitations and contracts. The term “RAC” in the Limitation of Future Contracting clauses includes not only RAC solicitations and contracts but other long term..., except site specific solicitations and contracts. The term “ERRS” in the Limitation of Future Contracting...

  4. 48 CFR 1509.507-2 - Contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) solicitations and contracts, except Site Specific solicitations and contracts. The term “RAC” in the Limitation of Future Contracting clauses includes not only RAC solicitations and contracts but other long term..., except site specific solicitations and contracts. The term “ERRS” in the Limitation of Future Contracting...

  5. Conscientiousness and reactions to psychological contract breach: a longitudinal field study.

    PubMed

    Orvis, Karin A; Dudley, Nicole M; Cortina, Jose M

    2008-09-01

    The authors examined the role of employee conscientiousness as a moderator of the relationships between psychological contract breach and employee behavioral and attitudinal reactions to the breach. They collected data from 106 newly hired employees within the 1st month of employment (Time 1), 3 months later (Time 2), and 8 months after Time 1 (Time 3) to observe the progression through contract development, breach, and reaction. Results suggest that conscientiousness is a significant moderator for 4 of the 5 contract breach-employee reaction relationships examined (turnover intentions, organizational loyalty, job satisfaction, and 1 of 2 facets of job performance). Specifically, employees who were lower in conscientiousness had more negative reactions to perceived breach with respect to turnover intentions, organizational loyalty, and job satisfaction. In contrast, employees who were higher in conscientiousness reduced their job performance to a greater degree in response to contract breach. Future research directions are discussed.

  6. 48 CFR 232.501-3 - Contract price.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contract price. 232.501-3... 232.501-3 Contract price. (b) The contracting officer may approve progress payments when the contract price exceeds the funds obligated under the contract, provided the contract limits the Government's...

  7. 7 CFR 4288.121 - Contract.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE PAYMENT PROGRAMS Advanced Biofuel Payment Program General Provisions Enrollment Provisions § 4288.121 Contract. Advanced biofuel producers determined to be eligible to.... (a) Contract. The Agency will forward the contract to the advanced biofuel producer. The advanced...

  8. Reasons for Letter Contracts.

    DTIC Science & Technology

    1980-09-01

    accelerated Initial Operational Capability (IOC). The TOW-DRAGON PM reacted accordingly. This also is a good example of a letter contract award to permit...Government. Good pricing depends pri- marily upon the exercise of sound judgement by all personnel concerned with the procurement. I: 3-801.2...Contracts. (a) The written determination required by DAR 3-408(c)(1) shall in- clude an outline of the reaons for a letter contract and the alternatives

  9. 48 CFR 39.107 - Contract clause.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.107 Contract clause. The contracting officer..., in solicitations and contracts for information technology which require security of information technology, and/or are for the design, development, or operation of a system of records using commercial...

  10. 48 CFR 39.107 - Contract clause.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.107 Contract clause. The contracting officer..., in solicitations and contracts for information technology which require security of information technology, and/or are for the design, development, or operation of a system of records using commercial...

  11. 48 CFR 39.107 - Contract clause.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.107 Contract clause. The contracting officer..., in solicitations and contracts for information technology which require security of information technology, and/or are for the design, development, or operation of a system of records using commercial...

  12. 48 CFR 39.107 - Contract clause.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.107 Contract clause. The contracting officer..., in solicitations and contracts for information technology which require security of information technology, and/or are for the design, development, or operation of a system of records using commercial...

  13. 48 CFR 747.507 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 747.507 Section 747.507 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT CONTRACT MANAGEMENT TRANSPORTATION Ocean Transportation by U.S.-Flag Vessels 747.507 Contract clauses. Contracting...

  14. 48 CFR 1443.205 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 1443.205 Section 1443.205 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 1443.205 Contract clauses. BPCs may establish procedures, when...

  15. 48 CFR 970.1504 - Contract pricing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract pricing. 970.1504 Section 970.1504 Federal Acquisition Regulations System DEPARTMENT OF ENERGY AGENCY SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Contracting by Negotiation 970.1504 Contract pricing. ...

  16. 48 CFR 39.107 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... CONTRACTING ACQUISITION OF INFORMATION TECHNOLOGY General 39.107 Contract clause. The contracting officer..., in solicitations and contracts for information technology which require security of information... information technology services or support services. [61 FR 41470, Aug. 8, 1996. Redesignated at 62 FR 274...

  17. 48 CFR 204.802 - Contract files.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Contract files. 204.802 Section 204.802 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL ADMINISTRATIVE MATTERS Contract Files 204.802 Contract files. Official contract...

  18. 48 CFR 204.802 - Contract files.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Contract files. 204.802 Section 204.802 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL ADMINISTRATIVE MATTERS Contract Files 204.802 Contract files. Official contract...

  19. 48 CFR 204.802 - Contract files.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contract files. 204.802 Section 204.802 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL ADMINISTRATIVE MATTERS Contract Files 204.802 Contract files. Official contract...

  20. 48 CFR 204.802 - Contract files.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 3 2012-10-01 2012-10-01 false Contract files. 204.802 Section 204.802 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL ADMINISTRATIVE MATTERS Contract Files 204.802 Contract files. Official contract...

  1. 48 CFR 204.802 - Contract files.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 3 2013-10-01 2013-10-01 false Contract files. 204.802 Section 204.802 Federal Acquisition Regulations System DEFENSE ACQUISITION REGULATIONS SYSTEM, DEPARTMENT OF DEFENSE GENERAL ADMINISTRATIVE MATTERS Contract Files 204.802 Contract files. Official contract...

  2. 48 CFR 37.304 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 1 2011-10-01 2011-10-01 false Contract clauses. 37.304 Section 37.304 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING SERVICE CONTRACTING Dismantling, Demolition, or Removal of Improvements 37.304 Contract clauses...

  3. 48 CFR 732.111 - Contract clauses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Contract clauses. 732.111 Section 732.111 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING General 732.111 Contract clauses. (a) [Reserved] (b) USAID may...

  4. 48 CFR 732.111 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Contract clauses. 732.111 Section 732.111 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING General 732.111 Contract clauses. (a) [Reserved] (b) USAID may...

  5. 48 CFR 936.7101 - Construction contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Construction contracts... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Inspection and Acceptance 936.7101 Construction contracts. (a) Inspection services may be performed by the architect-engineer responsible for the...

  6. 48 CFR 936.7101 - Construction contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Construction contracts... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Inspection and Acceptance 936.7101 Construction contracts. (a) Inspection services may be performed by the architect-engineer responsible for the...

  7. 48 CFR 936.7101 - Construction contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 48 Federal Acquisition Regulations System 5 2013-10-01 2013-10-01 false Construction contracts... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Inspection and Acceptance 936.7101 Construction contracts. (a) Inspection services may be performed by the architect-engineer responsible for the...

  8. 48 CFR 936.7101 - Construction contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 48 Federal Acquisition Regulations System 5 2012-10-01 2012-10-01 false Construction contracts... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Inspection and Acceptance 936.7101 Construction contracts. (a) Inspection services may be performed by the architect-engineer responsible for the...

  9. 48 CFR 936.7101 - Construction contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 5 2014-10-01 2014-10-01 false Construction contracts... CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Inspection and Acceptance 936.7101 Construction contracts. (a) Inspection services may be performed by the architect-engineer responsible for the...

  10. 48 CFR 3428.370 - Contract clause.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Contract clause. 3428.370 Section 3428.370 Federal Acquisition Regulations System DEPARTMENT OF EDUCATION ACQUISITION REGULATION GENERAL CONTRACTING REQUIREMENTS BONDS AND INSURANCE Insurance 3428.370 Contract clause. The contracting...

  11. 48 CFR 1443.205 - Contract clauses.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 5 2011-10-01 2011-10-01 false Contract clauses. 1443.205 Section 1443.205 Federal Acquisition Regulations System DEPARTMENT OF THE INTERIOR CONTRACT MANAGEMENT CONTRACT MODIFICATIONS Change Orders 1443.205 Contract clauses. BPCs may establish procedures, when...

  12. Towards a tactical nuclear weapons treaty? Is There a Role of IAEA Tools of Safeguards?

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Saunders, Emily C.; Rowberry, Ariana N.; Fearey, Bryan L.

    2012-07-12

    In recent years, there is growing interest in formal negotiations on non-strategic or tactical nuclear weapons. With the negotiations of New START, there has been much speculation that a tactical nuclear weapons treaty should be included in the follow on to New START. This paper examines the current policy environment related to tactical weapons and some of the issues surrounding the definition of tactical nuclear weapons. We then map out the steps that would need to be taken in order to begin discussions on a tactical nuclear weapons treaty. These steps will review the potential role of the IAEA inmore » verification of a tactical nuclear weapons treaty. Specifically, does IAEA involvement in various arms control treaties serve as a useful roadmap on how to overcome some of the issues pertaining to a tactical nuclear weapons treaty?« less

  13. Contingency contracting with school problems

    PubMed Central

    Cantrell, Robert P.; Cantrell, Mary Lynn; Huddleston, Clifton M.; Wooldridge, Ralph L.

    1969-01-01

    Contingency contracting procedures used in managing problems with school-age children involved analyzing teacher and/or parental reports of behavior problem situations, isolating the most probable contingencies then in effect, the range of reinforcers presently available, and the ways in which they were obtained. The authors prepared written contracts delineating remediative changes in reinforcement contingencies. These contracts specified ways in which the child could obtain existing individualized reinforcers contingent upon approximations to desired appropriate behaviors chosen as incompatible with the referral problem behaviors. Contract procedures were administered by the natural contingency managers, parents and/or teachers, who kept daily records of contracted behaviors and reinforcers. These records were sent to the authors and provided feedback on the progress of the case. Initial results of this procedure have been sufficiently encouraging to warrant recommending an experimental analysis of contingency contracting as a clinical method. PMID:16795222

  14. 48 CFR 232.703 - Contract funding requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 48 Federal Acquisition Regulations System 3 2014-10-01 2014-10-01 false Contract funding... SYSTEM, DEPARTMENT OF DEFENSE GENERAL CONTRACTING REQUIREMENTS CONTRACT FINANCING Contract Funding 232.703 Contract funding requirements. ...

  15. 7 CFR 1717.606 - Standard forms of construction contracts, and engineering and architectural services contracts.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... engineering and architectural services contracts. 1717.606 Section 1717.606 Agriculture Regulations of the... Standard forms of construction contracts, and engineering and architectural services contracts. All..., materials, equipment, engineering services, and architectural services, regardless of the source of funding...

  16. 7 CFR 1717.606 - Standard forms of construction contracts, and engineering and architectural services contracts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... engineering and architectural services contracts. 1717.606 Section 1717.606 Agriculture Regulations of the... Standard forms of construction contracts, and engineering and architectural services contracts. All..., materials, equipment, engineering services, and architectural services, regardless of the source of funding...

  17. 7 CFR 1717.606 - Standard forms of construction contracts, and engineering and architectural services contracts.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... engineering and architectural services contracts. 1717.606 Section 1717.606 Agriculture Regulations of the... Standard forms of construction contracts, and engineering and architectural services contracts. All..., materials, equipment, engineering services, and architectural services, regardless of the source of funding...

  18. 7 CFR 1717.606 - Standard forms of construction contracts, and engineering and architectural services contracts.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... engineering and architectural services contracts. 1717.606 Section 1717.606 Agriculture Regulations of the... Standard forms of construction contracts, and engineering and architectural services contracts. All..., materials, equipment, engineering services, and architectural services, regardless of the source of funding...

  19. 7 CFR 1717.606 - Standard forms of construction contracts, and engineering and architectural services contracts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... engineering and architectural services contracts. 1717.606 Section 1717.606 Agriculture Regulations of the... Standard forms of construction contracts, and engineering and architectural services contracts. All..., materials, equipment, engineering services, and architectural services, regardless of the source of funding...

  20. 48 CFR 2816.602 - Labor-hour contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Labor-hour contracts. 2816... and Contract Types TYPES OF CONTRACTS Time-and-Materials, Labor-Hour, and Letter Contracts 2816.602 Labor-hour contracts. The limitations set forth in 2816.601 for time-and-material contracts also apply...