Sample records for idaho llc bbwi

  1. 77 FR 38049 - Idaho Wind Partners 1, LLC; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-26

    ... avoided cost contracts, whether Idaho Power acts unilaterally or acts pursuant to a schedule or policy... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL12-74-000] Idaho Wind... CFR 385.207, the Idaho Wind Partners 1, LLC submitted a Petition for Declaratory Order seeking that...

  2. 75 FR 81265 - Idaho Wind Partners 1, LLC; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11-12-000] Idaho Wind... 15, 2010, Idaho Wind Partners 1, LLC (Petitioner), pursuant to Rule 207 of the Federal Energy...) Violate any of the Commission's anti-manipulation rules, and (2) result in the loss of small power...

  3. 78 FR 15719 - Interconnect Solar Development LLC; Notice of Petition for Enforcement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-12

    ... (PURPA), 16 U.S.C. 824a-3(h)(2006), Interconnect Solar Development LLC filed a Petition for Enforcement... Idaho Public Utilities Commission and Idaho Power; find that their actions violated PURPA; and to take any action deemed necessary to enforce the requirements of PURPA. Any person desiring to intervene or...

  4. After Action Report: Idaho National Laboratory Annual Exercise June 10, 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barnes, Vernon Scott

    On June 10, 2015, Idaho National Laboratory (INL), in coordination with the State of Idaho, local jurisdictions, Department of Energy Idaho Operations Office (DOE-ID), and DOE Headquarters (DOE HQ), conducted the annual emergency exercise to demonstrate the ability to implement the requirements of DOE O 151.1C, “Comprehensive Emergency Management System.” The INL contractor, Battelle Energy Alliance, LLC (BEA), in coordination with other INL contractors, conducted operations and demonstrated appropriate response measures to mitigate an event and protect the health and safety of personnel, the environment, and property. Offsite response organizations participated to demonstrate appropriate response measures.

  5. Idaho National Laboratory Emergency Readiness Assurance Plan - Fiscal Year 2015

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farmer, Carl J.

    Department of Energy Order 151.1C, Comprehensive Emergency Management System requires that each Department of Energy field element documents readiness assurance activities, addressing emergency response planning and preparedness. Battelle Energy Alliance, LLC, as prime contractor at the Idaho National Laboratory (INL), has compiled this Emergency Readiness Assurance Plan to provide this assurance to the Department of Energy Idaho Operations Office. Stated emergency capabilities at the INL are sufficient to implement emergency plans. Summary tables augment descriptive paragraphs to provide easy access to data. Additionally, the plan furnishes budgeting, personnel, and planning forecasts for the next 5 years.

  6. 78 FR 34090 - Lois Von Morganroth; Shiloh Warm Springs Ranch, LLC; Notice of Application for Transfer of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    ... Springs Ranch, LLC (transferee) filed an application for the transfer of license for the L & M Angus Ranch..., Idaho. Applicants seek Commission approval to transfer the license for the L & M Angus Ranch Project...

  7. 77 FR 29633 - Alta Wind VII, LLC, Alta Wind IX, LLC, Alta Wind X, LLC, Alta Wind XI, LLC, Alta Wind XII, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL12-68-000] Alta Wind VII, LLC, Alta Wind IX, LLC, Alta Wind X, LLC, Alta Wind XI, LLC, Alta Wind XII, LLC, Alta Wind XIII, LLC, Alta Wind XIV, LLC, Alta Wind XV, LLC, Alta Windpower Development, LLC, TGP Development Company, LLC...

  8. 75 FR 23263 - Alta Wind I, LLC; Alta Wind II, LLC; Alta Wind III, LLC; Alta Wind IV, LLC; Alta Wind V, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-03

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-62-000] Alta Wind I, LLC; Alta Wind II, LLC; Alta Wind III, LLC; Alta Wind IV, LLC; Alta Wind V, LLC; Alta Wind VI, LLC; Alta Wind VII, LLC; Alta Wind VIII, LLC; Alta Windpower Development, LLC; TGP Development Company, LLC...

  9. 78 FR 76609 - Genesis Solar, LLC; NRG Delta LLC; Mountain View Solar, LLC; Pheasant Run Wind, LLC; Pheasant Run...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-18

    ... Delta LLC; Mountain View Solar, LLC; Pheasant Run Wind, LLC; Pheasant Run Wind II, LLC; Tuscola Wind II, LLC; Mountain Wind Power, LLC; Mountain Wind Power II, LLC; Summerhaven Wind, LP; Notice of...

  10. 40 CFR 49.10711 - Federal Implementation Plan for the Astaris-Idaho LLC Facility (formerly owned by FMC Corporation...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of the Fort Hall Indian Reservation. Bag leak detection guidance means Office of Air Quality Planning... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... the meaning accorded them under the Clean Air Act, except as follows: Astaris-Idaho or Astaris-Idaho...

  11. 77 FR 61597 - Avalon Wind, LLC; Avalon Wind 2, LLC; Catalina Solar, LLC; Catalina Solar 2, LLC; Pacific Wind...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL12-109-000] Avalon Wind, LLC; Avalon Wind 2, LLC; Catalina Solar, LLC; Catalina Solar 2, LLC; Pacific Wind Lessee, LLC; Pacific Wind 2, LLC; Valentine Solar, LLC; EDF Renewable Development, Inc.; Notice of Petition for Declaratory...

  12. 77 FR 48138 - Topaz Solar Farms LLC; High Plains Ranch II, LLC; Bethel Wind Energy LLC; Rippey Wind Energy LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-13

    ... Ranch II, LLC; Bethel Wind Energy LLC; Rippey Wind Energy LLC; Pacific Wind, LLC; Colorado Highlands Wind, LLC; Shooting Star Wind Project, LLC; Notice of Effectiveness of Exempt Wholesale Generator or...

  13. 75 FR 45623 - Morris Energy Group, LLC v.PSEG Energy Resources & Trade LLC; PSEG Fossil LLC; and PSEG Power LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-03

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-79-000] Morris Energy Group, LLC v.PSEG Energy Resources & Trade LLC; PSEG Fossil LLC; and PSEG Power LLC; Notice of Complaint...) filed a complaint against PSEG Energy Resources & Trade, LLC, PSEG Fossil LLC and PSEG Power LLC (PSEG...

  14. Aging System Sustainment and Enabling Technologies (ASSET)

    DTIC Science & Technology

    2014-03-31

    American Manufacturer Network Lewiston Idaho American Panel Corp Alpharetta Georgia American Precision Machining LLC Tulsa Oklahoma Ameriglo LLC... Idaho Shantelle Powell Agency, Inc. New York New York Sherry Laboratories Broken Arrow Oklahoma Sherry Laboratories of Indiana, LLC Daleville Indiana

  15. 77 FR 42714 - Eagle Creek Hydropower, LLC, Eagle Creek Land Resources, LLC, Eagle Creek Water Resources, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-20

    ... Hydropower, LLC, Eagle Creek Land Resources, LLC, Eagle Creek Water Resources, LLC; Notice of Application...: Eagle Creek Hydropower, LLC; Eagle Creek Land Resources, LLC; and Eagle Creek Water Resources, LLC. e... Contact: Robert Gates, Senior Vice President-- Operations, Eagle Creek Hydropower, LLC, Eagle Creek Water...

  16. 78 FR 32385 - Exelon Generation Company, LLC; CER Generation II, LLC; Constellation Mystic Power, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL13-64-000] Exelon Generation Company, LLC; CER Generation II, LLC; Constellation Mystic Power, LLC; Constellation NewEnergy...) Rules of Practice and Procedure, 18 CFR 385.207, Exelon Generation Company, LLC, CER Generation II, LLC...

  17. 77 FR 14010 - Rocky Ridge Wind Project, LLC, Blackwell Wind, LLC, CPV Cimarron Renewable Energy Company, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-08

    ..., EG12-18-000, EG12-19-000, EG12- 20-000, EG12-21-000, EG12-22-000, EG12-23-000] Rocky Ridge Wind Project, LLC, Blackwell Wind, LLC, CPV Cimarron Renewable Energy Company, LLC, Minco Wind Interconnection Services, LLC, Shiloh III Lessee, LLC, California Ridge Wind Energy LLC, Perrin Ranch Wind, LLC, Erie Wind...

  18. 78 FR 29364 - Exelon Corporation, Exelon Wind 1, LLC, Exelon Wind 2, LLC, Exelon Wind 3, LLC, Exelon Wind 4...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-20

    ...-005, QF07-55-005, QF07-56-005, QF07-257-004] Exelon Corporation, Exelon Wind 1, LLC, Exelon Wind 2, LLC, Exelon Wind 3, LLC, Exelon Wind 4, LLC, Exelon Wind 5, LLC, Exelon Wind 6, LLC, Exelon Wind 7, LLC, Exelon Wind 8, LLC, Exelon Wind 9, LLC, Exelon Wind 10, LLC, Exelon Wind 11, LLC, High Plains...

  19. 75 FR 27332 - AER NY-Gen, LLC; Eagle Creek Hydro Power, LLC; Eagle Creek Water Resources, LLC; Eagle Creek Land...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-14

    ... 9690-106] AER NY-Gen, LLC; Eagle Creek Hydro Power, LLC; Eagle Creek Water Resources, LLC; Eagle Creek... Power, LLC, Eagle Creek Water Resources, LLC, and Eagle Creek Land Resources, LLC (transferees) filed an.... Paul Ho, Eagle Creek Hydro Power, LLC, Eagle Creek Water Resources, LLC, and Eagle Creek Land Resources...

  20. 77 FR 13318 - SV Hydro, LLC, Coffeeville, LLC, FFP Project 99, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14298-000, 14299-000, 14301-000] SV Hydro, LLC, Coffeeville, LLC, FFP Project 99, LLC; Notice Announcing Filing Priority for... follows: 1. FFP Project 99, LLC: Project No. 14301-000. 2. SV Hydro, LLC: Project No. 14298-000. 3...

  1. 75 FR 47301 - Cedro Hill Wind LLC; Butler Ridge Wind Energy Center, LLC; High Majestic Wind Energy Center, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-05

    ...- 000; EG10-34-000; EG10-34-000; EG10-35-000; EG10-36-000; EG10-37-000; EG10-38-000] Cedro Hill Wind LLC; Butler Ridge Wind Energy Center, LLC; High Majestic Wind Energy Center, LLC; Wessington Wind Energy Center, LLC; Juniper Canyon Wind Power LLC; Loraine Windpark Project, LLC; White Oak Energy LLC; Meadow...

  2. 77 FR 13592 - AER NY-Gen, LLC; Eagle Creek Hydro Power, LLC, Eagle Creek Water Resources, LLC, Eagle Creek Land...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-07

    ...; Eagle Creek Hydro Power, LLC, Eagle Creek Water Resources, LLC, Eagle Creek Land Resources, LLC; Notice... 24, 2012, AER NY-Gen, LLC (transferor), Eagle Creek Hydro Power, LLC, Eagle Creek Water Resources.... Cherry, Eagle Creek Hydro Power, LLC, Eagle Creek Water Resources, LLC, and Eagle Creek Land Resources...

  3. Idaho Geothermal Commercialization Program. Idaho geothermal handbook

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hammer, G.D.; Esposito, L.; Montgomery, M.

    The following topics are covered: geothermal resources in Idaho, market assessment, community needs assessment, geothermal leasing procedures for private lands, Idaho state geothermal leasing procedures - state lands, federal geothermal leasing procedures - federal lands, environmental and regulatory processes, local government regulations, geothermal exploration, geothermal drilling, government funding, private funding, state and federal government assistance programs, and geothermal legislation. (MHR)

  4. 76 FR 13976 - Eastern Idaho Resource Advisory Committee; Caribou-Targhee National Forest, Idaho Falls, ID

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-15

    ...-Targhee National Forest, Idaho Falls, ID AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY... National Forests' Eastern Idaho Resource Advisory Committee will meet Friday, March 25, 2011 in Idaho Falls...-Targhee National Forest Headquarters Office, 1405 Hollipark Drive, Idaho Falls, Idaho 83401. FOR FURTHER...

  5. 76 FR 13345 - Eastern Idaho Resource Advisory Committee; Caribou-Targhee National Forest, Idaho Falls, ID

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-11

    ...-Targhee National Forest, Idaho Falls, ID AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY... National Forests' Eastern Idaho Resource Advisory Committee will meet Friday, March 25, 2011 in Idaho Falls...-Targhee National Forest Headquarters Office, 1405 Hollipark Drive, Idaho Falls, Idaho 83401. FOR FURTHER...

  6. 78 FR 9907 - TGP Development Company, LLC; TGP Flying Cloud Holdings, LLC; WEC TX Company, LLC v. Arizona...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL13-45-000] TGP Development Company, LLC; TGP Flying Cloud Holdings, LLC; WEC TX Company, LLC v. Arizona Public Service Company... Cloud Holdings, LLC, and WEC TX Company, LLC (collectively, Complainants) filed a formal complaint...

  7. 75 FR 1052 - Terra-Gen Dixie Valley, LLC; TGP Dixie Development Company, LLC; New York Canyon, LLC; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-08

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-29-000] Terra-Gen Dixie Valley, LLC; TGP Dixie Development Company, LLC; New York Canyon, LLC; Notice of Filing December 30, 2009. Take notice that on December 24, 2009, Terra-Gen Dixie Valley, LLC, TGP Dixie Development Company, LLC and New York Canyon, LLC (``Petitioner...

  8. 75 FR 20806 - Notice of Intent To Grant Exclusive License

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-21

    ... Research Service, intends to grant to Basin Seed Company, LLC of Nampa, Idaho, an exclusive license to the... Seed Company, LLC of Nampa, Idaho has submitted a complete and sufficient application for a license...

  9. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2016 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2017. Specifically, the ERAP assures the Department of Energy Idahomore » Operations Office that stated emergency capabilities at INL are sufficient to implement PLN 114, “INL Emergency Plan/RCRA Contingency Plan.”« less

  10. Idaho National Laboratory Emergency Readiness Assurance Plan — Fiscal Year 2014

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bush, Shane

    Battelle Energy Alliance, LLC, the prime contractor for Idaho National Laboratory (INL), provides this Emergency Readiness Assurance Plan (ERAP) for Fiscal Year 2014 in accordance with DOE O 151.1C, “Comprehensive Emergency Management System.” The ERAP documents the readiness of the INL Emergency Management Program using emergency response planning and preparedness activities as the basis. It describes emergency response planning and preparedness activities, and where applicable, summarizes and/or provides supporting information in tabular form for easy access to data. The ERAP also provides budget, personnel, and planning forecasts for Fiscal Year 2015. Specifically, the ERAP assures the Department of Energy Idahomore » Operations Office that stated emergency capabilities at INL are sufficient to implement PLN-114, “INL Emergency Plan/RCRA Contingency Plan.”« less

  11. 75 FR 7305 - Drake Switching Company, LLC-Operation Exemption- Drake Cement, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-18

    ... Switching Company, LLC--Operation Exemption-- Drake Cement, LLC Drake Switching Company, LLC (DSC), a... and operated by Drake Cement, LLC.\\1\\ \\1\\ Drake Cement, LLC filed a verified notice of exemption to acquire these track in STB Finance Docket No. 35350, Drake Cement, LLC--Acquisition Exemption--Clarkdale...

  12. 75 FR 62530 - Eagle Creek Hydro Power, LLC; Laredo Ridge Wind, LLC; RRI Energy West, Inc.; Goshen Phase II LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-12

    ...; EG10-52-000; EG10-53-000; EG10- 54-000; EG10-55-000; EG10-56-000] Eagle Creek Hydro Power, LLC; Laredo Ridge Wind, LLC; RRI Energy West, Inc.; Goshen Phase II LLC; Solar Partners I, LLC; Solar Partners II, LLC; Solar Partners VIII, LLC; Notice of Effectiveness of Exempt Wholesale Generator Status October 1...

  13. 77 FR 10739 - SV Hydro, LLC, Coffeeville, LLC, FFP Project 99, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14298-000, Project No. 14299-000, Project No. 14301-000] SV Hydro, LLC, Coffeeville, LLC, FFP Project 99, LLC; Notice... Project No. 14299-000, and FFP Project 99, LLC for Project No. 14301-000.\\2\\ \\1\\ Under the Commission's...

  14. 75 FR 55315 - National Fuel Marketing Company, LLC; NFM Midstream, LLC; NFM Texas Pipeline, LLC; NFM Texas...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IN09-10-000] National Fuel Marketing Company, LLC; NFM Midstream, LLC; NFM Texas Pipeline, LLC; NFM Texas Gathering, LLC; Notice of Amended Designation of Commission Staff as Non-Decisional September 2, 2010. On January 15, 2009, the Commission issued an order in the above-...

  15. Analysis of Idaho fire service education

    NASA Astrophysics Data System (ADS)

    Roberts, Walter O.

    1999-01-01

    Becoming a career fire fighter in the state of Idaho requires specialized knowledge and training. Fire science education at Idaho colleges and universities is available only to people who are affiliated with a fire department. Law enforcement curriculum, on the other hand, is available to any interested persons. A student in law enforcement can attend the Police Officers Standards and Training (POST) academy or participate in classes in one of Idaho's institutions for higher education. There are no fire academies in Idaho. Applicants wanting to become professional fire fighters in Idaho are required to compete with applicants from other states; many of whom have had prior fire education and training. Resident Idaho fire fighter applicants are at a disadvantage when applying for Idaho fire fighting positions. Because of this apparent need, I surveyed the Idaho fire chiefs, using a research instrument I developed in a graduate field research class. I wrote the research instrument to determine the educational needs of the Idaho fire service. The College of Southern Idaho (CSI) and the Idaho Fire Chiefs Association (IFCA) were the recipients of this survey. This report, Analysis of Idaho Fire Service Education, describes that research process from beginning to end.

  16. 40 CFR 81.313 - Idaho.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    .../15/90 Unclassifiable Lewiston 11/15/90 Unclassifiable Remainder of AQCR 62 (Idaho portion) 11/15/90... 40 Protection of Environment 18 2012-07-01 2012-07-01 false Idaho. 81.313 Section 81.313... AREAS FOR AIR QUALITY PLANNING PURPOSES Section 107 Attainment Status Designations § 81.313 Idaho. Idaho...

  17. 40 CFR 81.313 - Idaho.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .../15/90 Unclassifiable Lewiston 11/15/90 Unclassifiable Remainder of AQCR 62 (Idaho portion) 11/15/90... 40 Protection of Environment 17 2010-07-01 2010-07-01 false Idaho. 81.313 Section 81.313... AREAS FOR AIR QUALITY PLANNING PURPOSES Section 107 Attainment Status Designations § 81.313 Idaho. Idaho...

  18. 40 CFR 81.313 - Idaho.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    .../15/90 Unclassifiable Lewiston 11/15/90 Unclassifiable Remainder of AQCR 62 (Idaho portion) 11/15/90... 40 Protection of Environment 18 2013-07-01 2013-07-01 false Idaho. 81.313 Section 81.313... AREAS FOR AIR QUALITY PLANNING PURPOSES Section 107 Attainment Status Designations § 81.313 Idaho. Idaho...

  19. 40 CFR 81.313 - Idaho.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Unclassifiable Lewiston 11/15/90 Unclassifiable Remainder of AQCR 62 (Idaho portion) 11/15/90 Unclassifiable... 40 Protection of Environment 18 2014-07-01 2014-07-01 false Idaho. 81.313 Section 81.313... AREAS FOR AIR QUALITY PLANNING PURPOSES Section 107 Attainment Status Designations § 81.313 Idaho. Idaho...

  20. 40 CFR 81.313 - Idaho.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .../15/90 Unclassifiable Lewiston 11/15/90 Unclassifiable Remainder of AQCR 62 (Idaho portion) 11/15/90... 40 Protection of Environment 17 2011-07-01 2011-07-01 false Idaho. 81.313 Section 81.313... AREAS FOR AIR QUALITY PLANNING PURPOSES Section 107 Attainment Status Designations § 81.313 Idaho. Idaho...

  1. 75 FR 76453 - Top of the World Wind Energy, LLC; Kit Carson Windpower, LLC; Chestnut Flats Wind, LLC; Minco...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-08

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EG10-65-000; EG10-66-000; EG10-67-000; EG10-68-000; EG10- 69-000; EG10-70-000; EG10-71-000] Top of the World Wind Energy, LLC; Kit Carson Windpower, LLC; Chestnut Flats Wind, LLC; Minco Wind, LLC; Arizona Solar One LLC; Criterion...

  2. Idaho Region IV Fourth-Grade Teachers' Perceptions about the Educational Influence of Idaho State Achievement Standards and the Idaho State Achievement Tests

    ERIC Educational Resources Information Center

    Wiggins, Annette Marie

    2010-01-01

    The purpose of this study was to explore Idaho Region IV fourth-grade teachers' perceptions regarding the educational influence of Idaho State Achievement Standards and the Idaho Standards Achievement Tests (ISAT) in language usage, reading, and math. Differences between subgroups based on teacher/school demographics, specifically, teachers'…

  3. 76 FR 40946 - WNC Tax Credits 40, LLC, WNC Tax Credits 41, LLC, WNC Housing Tax Credits Manager 2, LLC, WNC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-12

    ... Credits 40, LLC, WNC Tax Credits 41, LLC, WNC Housing Tax Credits Manager 2, LLC, WNC National Partners... (``Fund 41'') (each a ``Fund,'' and collectively, the ``Funds''), WNC Housing Tax Credits Manager 2, LLC (the ``Manager''), WNC National Partners, LLC (``WNC National Partners'') and WNC & Associates, Inc...

  4. 75 FR 7303 - Drake Cement, LLC-Acquisition Exemption-Clarkdale Arizona Central Railroad, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-18

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [STB Finance Docket No. 35350] Drake Cement, LLC--Acquisition Exemption--Clarkdale Arizona Central Railroad, LLC Drake Cement, LLC (DC), a..., Drake Switching Company, LLC --Operation Exemption-- Drake Cement, LLC. DC certifies that the projected...

  5. 76 FR 74779 - SV Hydro LLC; Coffeeville LLC; FFP Project 99 LLC; Lock Hydro Friends Fund XIV; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14298-000; 14299-000; 14301-000; 14302-000] SV Hydro LLC; Coffeeville LLC; FFP Project 99 LLC; Lock Hydro Friends Fund XIV... (Coffeeville), FFP Project 99 LLC (FFP 99), and Lock Hydro Friends Fund XIV (Lock Hydro) filed preliminary...

  6. 36 CFR 294.22 - Idaho Roadless Areas.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Idaho Roadless Areas. 294.22... Idaho Roadless Area Management § 294.22 Idaho Roadless Areas. (a) Designations. All National Forest System lands within the State of Idaho listed in § 294.29 are hereby designated as Idaho Roadless Areas...

  7. 75 FR 17976 - WNC Tax Credits 38, LLC, WNC Tax Credits 39, LLC, WNC Housing Tax Credits Manager, LLC and WNC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-08

    ... Credits 38, LLC, WNC Tax Credits 39, LLC, WNC Housing Tax Credits Manager, LLC and WNC & Associates, Inc... collectively, the ``Funds''), WNC Housing Tax Credits Manager, LLC (the ``Manager'') and WNC & Associates, Inc... credit under the Internal Revenue Code of 1986, as amended. The Manager is a California limited liability...

  8. 40 CFR 81.410 - Idaho.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 17 2010-07-01 2010-07-01 false Idaho. 81.410 Section 81.410... Visibility Is an Important Value § 81.410 Idaho. Area name Acreage Public Law establishing Federal land...,800 acres are in Idaho. 2 Selway Bitterroot Wilderness, 1,240,700 acres overall, of which 988,700...

  9. 76 FR 67775 - Citadel LLC (formerly Citadel Investment Group, L.L.C.) and CEIF LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... SECURITIES AND EXCHANGE COMMISSION [Investment Company Act Release No. 29851; File No. 813-00377] Citadel LLC (formerly Citadel Investment Group, L.L.C.) and CEIF LLC; Notice of Application October 27... order under sections 6(b) and 6(e) of the Investment Company Act of 1940 (the ``Act'') granting an...

  10. Idaho traffic collisions, 2004

    DOT National Transportation Integrated Search

    2004-01-01

    Idaho Traffic Collisions 2004 provides an annual description of motor vehicle collision characteristics for Idaho. : This document is used by state and local transportation, law enforcement, health, and other agencies charged with : the responsibilit...

  11. Idaho traffic collisions, 2006

    DOT National Transportation Integrated Search

    2006-01-01

    Idaho Traffic Collisions 2006 provides an annual description of motor vehicle collision characteristics for Idaho. : This document is used by state and local transportation, law enforcement, health, and other agencies charged with : the responsibilit...

  12. Idaho traffic collisions, 2002

    DOT National Transportation Integrated Search

    2002-01-01

    Idaho Traffic Collisions 2002 provides an annual description of motor vehicle collision characteristics for : Idaho. This document is used by state and local transportation, law enforcement, health, and other agencies : charged with the responsibilit...

  13. Idaho traffic collisions, 2003

    DOT National Transportation Integrated Search

    2003-01-01

    Idaho Traffic Collisions 2003 provides an annual description of motor vehicle collision characteristics for Idaho. : This document is used by state and local transportation, law enforcement, health, and other agencies charged with : the responsibilit...

  14. 77 FR 75701 - Landisville Railroad, LLC-Operation Exemption-Buckeye East Chicago Railroad LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-21

    ... Railroad, LLC--Operation Exemption--Buckeye East Chicago Railroad LLC Landisville Railroad, LLC... operate approximately 7,065 feet (1.34 miles) of track,\\1\\ existing railroad right-of-way, and bulk liquid transloading facilities owned by Buckeye East Chicago Railroad, LLC, a Class III rail carrier, in East Chicago...

  15. 77 FR 40608 - Notice of Petition for Enforcement and Declaratory Order; Exelon Wind 1, LLC; Exelon Wind 2, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-10

    ... Petition for Enforcement and Declaratory Order; Exelon Wind 1, LLC; Exelon Wind 2, LLC; Exelon Wind 3, LLC; Exelon Wind 4, LLC; Exelon Wind 5, LLC; Exelon Wind 6, LLC; Exelon Wind 7, LLC; Exelon Wind 8, LLC; Exelon Wind 9, LLC; Exelon Wind 10, LLC; Exelon Wind 11, LLC; High Plains Wind Power, LLC Take notice...

  16. Idaho traffic collisions, 2000

    DOT National Transportation Integrated Search

    2000-01-01

    Idaho Traffic Collisions 2000 provides an annual description of collision characteristics for Idaho. This : document is used by state and local transportation, law enforcement, health, and other agencies charged with : the responsibility of coping wi...

  17. Idaho traffic collisions, 2005

    DOT National Transportation Integrated Search

    2005-01-01

    Idaho Traffic Collisions 2005 provides an annual description of motor vehicle collision characteristics for Idaho. This document is used by state and local transportation, law enforcement, health, and other agencies charged with the responsibility of...

  18. Idaho traffic collisions, 2001

    DOT National Transportation Integrated Search

    2001-01-01

    Idaho Traffic Collisions 2001 provides an annual description of collision characteristics for Idaho. This document is used by state and local transportation, law enforcement, health, and other agencies charged with the responsibility of coping with t...

  19. Idaho traffic crashes, 2007

    DOT National Transportation Integrated Search

    2007-01-01

    Idaho Traffic Crashes 2007 provides an annual description of motor vehicle crash characteristics for : crashes that have occurred within the State of Idaho. This document is used by state and local : transportation, law enforcement, health, and other...

  20. Idaho traffic crashes, 2009

    DOT National Transportation Integrated Search

    2009-01-01

    Idaho Traffic Crashes 2009 provides an annual description of motor vehicle crash characteristics for : crashes that have occurred on public roads within the State of Idaho. This document is used by state and : local transportation, law enforcement, h...

  1. Idaho traffic crashes, 2008

    DOT National Transportation Integrated Search

    2008-01-01

    Idaho Traffic Crashes 2008 provides an annual description of motor vehicle crash characteristics for : crashes that have occurred on public roads within the State of Idaho. This document is used by state and : local transportation, law enforcement, h...

  2. Boise Basin Experimental Forest (Idaho)

    Treesearch

    Russell T. Graham; Theresa B. Jain

    2004-01-01

    The Boise Basin Experimental Forest was established in 1933 to study ponderosa pine. It consists of 3,537 ha with elevations ranging from 1,200 to 3,630 m. Boise Basin is divided into three units surrounding Idaho City in southern Idaho. Idaho City was a booming mining town in the 1870s and the surrounding forests supplied material to the community. Two units were...

  3. Idaho Library Laws, 1996-1997. Full Edition.

    ERIC Educational Resources Information Center

    Idaho State Library, Boise.

    This new edition of the "Idaho Library Laws" contains changes through the 1996 legislative session and includes "Idaho Code" sections that legally affect city, school-community or district libraries, or the Idaho State Library. These sections include the basic library laws in "Idaho Code" Title 33, Chapters 25, 26,…

  4. 75 FR 17706 - FPL Energy Maine Hydro LLC, Complainant v. Great Lakes Hydro America LLC Rumford Falls Hydro LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-53-000] FPL Energy Maine Hydro LLC, Complainant v. Great Lakes Hydro America LLC Rumford Falls Hydro LLC, Respondents; Notice of Complaint March 29, 2010. Take notice that on March 26, 2010, pursuant to section 206 of the Federal Energy Regulatory Commission's (Commission...

  5. 76 FR 36914 - Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11-42-000] Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas Turbine Power LLC, Dunkirk Power LLC, Huntley Power LLC, Oswego Harbor Power LLC, TC Ravenswood, LLC, v. New York Independent System Operator, Inc. Notice of Revised...

  6. 76 FR 34692 - Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11-42-000] Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas Turbine Power LLC, Dunkirk Power LLC, Huntley Power LLC, Oswego Harbor Power LLC, TC Ravenswood, LLC; v. New York Independent System Operator, Inc.; Notice of Complaint...

  7. 76 FR 36910 - Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11-42-000] Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas Turbine Power LLC, Dunkirk Power LLC, Huntley Power LLC, Oswego Harbor Power LLC, TC Ravenswood, LLC. v. New York Independent System Operator, Inc.; Notice of Amendment t...

  8. Idaho Library Laws, 1999-2000. Full Edition.

    ERIC Educational Resources Information Center

    Idaho State Library, Boise.

    This new edition of the Idaho Library Laws contains changes through the 1998 legislative session and includes Idaho Code sections that legally affect city, school-community or district libraries, or the Idaho State Library. These sections include the basic library laws in Idaho Code Title 33, Chapters 25, 26, and 27, additional sections of the law…

  9. Depth to water, 1991, in the Rathdrum Prairie, Idaho; Spokane River valley, Washington; Moscow-Lewiston-Grangeville area, Idaho; and selected intermontane valleys, east-central Idaho

    USGS Publications Warehouse

    Berenbrock, Charles E.; Bassick, M.D.; Rogers, T.L.; Garcia, S.P.

    1995-01-01

    This map report illustrates digitally generated depth-to-water zones for the Rathdrum Prairie in Idaho; part of the Spokane River Valley in eastern Washington; and the intermontane valleys of the upper Big Wood, Big Lost, Pahsimeroi, Little Lost, and Lemhi Rivers and Birch Creek in Idaho. Depth to water is 400 to 500 feet below land surface in the northern part of Rathdrum Prairie, 100 to 200 feet below land surface at the Idaho-Washington State line, and 0 to 250 feet below land surface in the Spokane area. Depth to water in the intermontane valleys in east-central Idaho is least (usually less than 50 feet) near streams and increases toward valley margins where mountain-front alluvial fans have formed. Depths to water shown in the Moscow-Lewiston-Grangeville area in Idaho are limited to point data at individual wells because most of the water levels measured were not representative of levels in the uppermost aquifer but of levels in deeper aquifers.

  10. Hispanics in Idaho: Concerns and Challenges. Idaho Human Rights Commission, Research Report.

    ERIC Educational Resources Information Center

    Mabbutt, Richard

    A study was done of the civil rights status of Hispanics in Idaho with respect to issues raised at a series of community hearings sponsored by the Idaho Human Rights Commission. Testimony included concerns about state and local hiring practices; the perceived need for bilingual state social service providers and educators; the need for outreach…

  11. 78 FR 15053 - Simpson Lumber Company, LLC, Shelton, Washington; Simpson Lumber Company, LLC, Tacoma, Washington...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-08

    ...,372B] Simpson Lumber Company, LLC, Shelton, Washington; Simpson Lumber Company, LLC, Tacoma, Washington; Simpson Lumber Company, LLC, Longview, Washington; Notice of Revised Determination on Reconsideration On... Reconsideration for the workers and former workers of Simpson Lumber Company, LLC, Shelton, Washington (TA-W-81...

  12. 77 FR 38884 - Professional Transportation, Inc.-Asset Acquisition-CUSA ES, LLC and CUSA CSS, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ..., Inc.--CUSA ES, LLC (MC-463168) and CUSA CSS, LLC (MC-522544) (collectively, Coach America Subsidiaries... Transportation, Inc.--Asset Acquisition--CUSA ES, LLC and CUSA CSS, LLC AGENCY: Surface Transportation Board. ACTION: Notice of Finance Application. SUMMARY: Professional Transportation, Inc. (PTI or Applicant), an...

  13. 78 FR 21151 - Boise White Paper, LLC, A Subsidiary of Boise Paper Holdings, LLC, Including On-Site Leased...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-09

    ... Paper, LLC, A Subsidiary of Boise Paper Holdings, LLC, Including On-Site Leased Workers From Guardsmark.... Helens, OR; Boise White Paper, LLC, A Subsidiary of Boise Paper Holdings, LLC, Vancouver, WA; Amended... workers and former workers of Boise White Paper, LLC, a subsidiary of Boise Paper Holdings, LLC, St...

  14. 78 FR 25784 - Keenesburg Direct Railroad, LLC-Acquisition and Operation Exemption-J D East, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-02

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35735] Keenesburg Direct Railroad, LLC--Acquisition and Operation Exemption--J D East, LLC Keenesburg Direct Railroad, LLC (KDR), a noncarrier, has filed a verified notice of exemption under 49 CFR 1150.31 to acquire from J D East, LLC (JDE...

  15. 76 FR 19473 - Chrysler Financial Services Americas, LLC, a Subsidiary of FinCo Intermediate Holding Co., LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-07

    ... Services Americas, LLC, a Subsidiary of FinCo Intermediate Holding Co., LLC, Troy Customer Contact Center... Co., LLC, Troy Customer Contact Center, Troy, Michigan (subject firm). The Department's Notice was... Services Americas, LLC, a subsidiary of FinCo Intermediate Holding Co., LLC, Troy Customer Contact Center...

  16. 77 FR 52310 - Central Idaho Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-29

    ... DEPARTMENT OF AGRICULTURE Forest Service Central Idaho Resource Advisory Committee AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY: The Central Idaho Resource Advisory Committee will meet in Salmon, Idaho and Challis, Idaho. The committee is authorized under the Secure Rural Schools and...

  17. 75 FR 65515 - Supermedia LLC, Formerally Known as IDEARC Media LLC, Supermedia Information Services LLC, Client...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-25

    ..., Formerally Known as IDEARC Media LLC, Supermedia Information Services LLC, Client Care Group and Publishing... September 3, 2010 and the Notice of Determination was published in the Federal Register on September 21... internal publishing support services. Workers are separately identifiable by service supplied. The negative...

  18. 77 FR 45575 - Central Idaho Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-01

    ... Idaho Resource Advisory Committee AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY: The Central Idaho Resource Advisory Committee will meet in Salmon, Idaho. The committee is authorized under... be held at the Public Lands Center, 1206 S. Challis Street, Salmon, Idaho 83467. All comments...

  19. 76 FR 66709 - Trunkline Gas Company, LLC, Sea Robin Pipeline Company, LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-27

    ... Company, LLC, Sea Robin Pipeline Company, LLC; Notice of Application Take notice that on October 7, 2011, Trunkline Gas Company, LLC (Trunkline) and Sea Robin Pipeline Company, LLC (Sea Robin), together referred to...), for permission and approval for Trunkline to abandon by sale to Sea Robin and for Sea Robin to acquire...

  20. Idaho Bicycle and Pedestrian Transportation

    DOT National Transportation Integrated Search

    1995-01-01

    The Idaho Bicycle and Pedestrian Transportation Plan of Idaho's long range transportation planning process sets the stage for changes in our transportation mix. The plan is about expanding options for personal transportation. Most importantly, it is ...

  1. 75 FR 82426 - Big Four Terminal Railroad, LLC-Operation Exemption-RMW Ventures, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-30

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35454] Big Four Terminal Railroad, LLC--Operation Exemption--RMW Ventures, LLC Big Four Terminal Railroad, LLC (BFTR), has filed a verified notice of exemption under 49 CFR 1150.31 to operate over 5.2 +/- miles of rail line between...

  2. 75 FR 76520 - Tennessee Southern Railroad Company, Patriot Rail, LLC, Patriot Rail Holdings LLC, and Patriot...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-08

    ... family by converting two of its subsidiaries from corporations into limited liability companies: (1... Railroad Company, Patriot Rail, LLC, Patriot Rail Holdings LLC, and Patriot Rail Corp.--Corporate Family... Railroad Company (TSRR), Patriot Rail, LLC (PRL) and its subsidiaries, Patriot Rail Holdings LLC (PRH) and...

  3. 78 FR 3425 - Filiquarian Publishing, LLC; Choice Level, LLC; and Joshua Linsk; Analysis of Proposed Consent...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-16

    ... FEDERAL TRADE COMMISSION [File No. 112 3195] Filiquarian Publishing, LLC; Choice Level, LLC; and Joshua Linsk; Analysis of Proposed Consent Order To Aid Public Comment AGENCY: Federal Trade Commission... approval, an agreement containing a consent order from Filiquarian Publishing, LLC; Choice Level, LLC; and...

  4. 78 FR 68466 - BLM Director's Response to the Idaho Governor's Appeal of the BLM Idaho State Director's Governor...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-14

    ... Bureau of Land Management (BLM) is publishing this notice to explain why the BLM Director is denying the...] BLM Director's Response to the Idaho Governor's Appeal of the BLM Idaho State Director's Governor's... (Finding) to the BLM Idaho State Director (State Director). The State Director determined the Governor's...

  5. 77 FR 25715 - Mississippi 8 Hydro, LLC; FFP Project 98, LLC, ; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No., 13010-002; Project No., 14272-000] Mississippi 8 Hydro, LLC; FFP Project 98, LLC, ; Notice Announcing Filing Priority for.... Mississippi 8 Hydro, LLC--Project No. 13010-002. 2. FFP Project 98, LLC--Project No. 14272-000. Dated: April...

  6. 78 FR 11928 - Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE MKT LLC; Order Instituting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-20

    ...-2012-58] Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE MKT LLC; Order Instituting.... I. Introduction On October 26, 2012, the New York Stock Exchange LLC (``NYSE'') and NYSE MKT LLC... of the market, the Floor broker may liquidate or cover the position only pursuant to a new order...

  7. 30 CFR 912.700 - Idaho Federal program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE IDAHO § 912.700 Idaho Federal program. (a) This part contains all rules that are applicable to surface coal mining operations in Idaho...

  8. 76 FR 31388 - Idaho Disaster #ID-00014

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ... SMALL BUSINESS ADMINISTRATION [Disaster Declaration 12603 and 12604] Idaho Disaster ID-00014... declaration of a major disaster for Public Assistance Only for the State of Idaho (FEMA-- 1987--DR), dated 05..., Clearwater, Idaho, Nez Perce, Shoshone, Nez Perce Tribe. The Interest Rates are: Percent For Physical Damage...

  9. 75 FR 45682 - Idaho Disaster #ID-00010

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-03

    ... SMALL BUSINESS ADMINISTRATION [Disaster Declaration 12250 and 12251] Idaho Disaster ID-00010... declaration of a major disaster for Public Assistance Only for the State of Idaho (FEMA-1927- DR), dated 07/27... adversely affected by the disaster: Primary Counties: Adams, Gem, Idaho, Lewis, Payette, Valley, Washington...

  10. 78 FR 34092 - Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice of Competing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    .... 14504-000] Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice of Competing Preliminary... Applications Lock+ Hydro Friends Fund XXX, LLC and FFP Project 121, LLC filed preliminary permit applications... regular business day. See id. at 385.2001(a)(2). Lock+ Hydro Friends Fund XXX, LLC's application is for a...

  11. 75 FR 49527 - Caps Visual Communications, LLC; Black Dot Group; Formerly Known as Caps Group Acquisition, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-74,195] Caps Visual Communications, LLC; Black Dot Group; Formerly Known as Caps Group Acquisition, LLC Chicago, IL; Amended... of Caps Visual Communications, LLC, Black Dot Group, formerly known as Caps Group Acquisition, LLC...

  12. Boise State's Idaho Eclipse Outreach Program

    NASA Astrophysics Data System (ADS)

    Davis, Karan; Jackson, Brian

    2017-10-01

    The 2017 total solar eclipse is an unprecedented opportunity for astronomical education throughout the continental United States. With the path of totality passing through 14 states, from Oregon to South Carolina, the United States is expecting visitors from all around the world. Due to the likelihood of clear skies, Idaho was a popular destination for eclipse-chasers. In spite of considerable enthusiasm and interest by the general population, the resources for STEM outreach in the rural Pacific Northwest are very limited. In order to help prepare Idaho for the eclipse, we put together a crowdfunding campaign through the university and raised over $10,000. Donors received eclipse shades as well as information about the eclipse specific to Idaho. Idaho expects 500,000 visitors, which could present a problem for the many small, rural towns scattered across the path of totality. In order to help prepare and equip the public for the solar eclipse, we conducted a series of site visits to towns in and near the path of totality throughout Idaho. To maximize the impact of this effort, the program included several partnerships with local educational and community organizations and a focus on the sizable refugee and low-income populations in Idaho, with considerable attendance at most events.

  13. 76 FR 56428 - Southern Cross Transmission LLC; Pattern Power Marketing LLC; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. TX11-1-000] Southern Cross Transmission LLC; Pattern Power Marketing LLC; Notice of Filing Take notice that on September 6, 2011, pursuant... Marketing LLC (PPM) jointly filed an application requesting that the Commission direct (1) the City of...

  14. 77 FR 10740 - Riverbank Hydro No. 22, LLC; FFP Project 93, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14269-000; 14270-000] Riverbank Hydro No. 22, LLC; FFP Project 93, LLC; Notice Announcing Preliminary Permit Drawing The... Riverbank Hydro No. 22, LLC for Project No. 14269-000, and FFP Project 93, LLC for Project No. 14270-000. \\1...

  15. 75 FR 41895 - Inteva Products, LLC Adrian, Michigan; Inteva Products, LLC Troy, Michigan; Amended Certification...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-19

    ... Products, LLC Adrian, Michigan; Inteva Products, LLC Troy, Michigan; Amended Certification Regarding... time period at the Troy, Michigan location of Inteva Products, LLC. The Troy, Michigan location.... Accordingly, the Department is amending the certification to include workers of the Troy, Michigan location of...

  16. Thickness of surficial sediment at and near the Idaho National Engineering Laboratory, Idaho

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anderson, S.R.; Liszewski, M.J.; Ackerman, D.J.

    1996-06-01

    Thickness of surficial sediment was determined from natural-gamma logs in 333 wells at and near the Idaho National Engineering Laboratory in eastern Idaho to provide reconnaissance data for future site-characterization studies. Surficial sediment, which is defined as the unconsolidated clay, silt, sand, and gravel that overlie the uppermost basalt flow at each well, ranges in thickness from 0 feet in seven wells drilled through basalt outcrops east of the Idaho Chemical Processing Plant to 313 feet in well Site 14 southeast of the Big Lost River sinks. Surficial sediment includes alluvial, lacustrine, eolian, and colluvial deposits that generally accumulated duringmore » the past 200 thousand years. Additional thickness data, not included in this report, are available from numerous auger holes and foundation borings at and near most facilities.« less

  17. 76 FR 17817 - North Central Idaho Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-31

    ... Central Idaho Resource Advisory Committee AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY: The North Central Idaho RAC will meet in Grangeville, Idaho. The committee is meeting as authorized... Supervisors Office, 104 Airport Road, Grangeville, Idaho. Written comments should be sent to Laura Smith at...

  18. 76 FR 78641 - Cedar Creek Wind Energy, LLC, Milford Wind Corridor Phase I, LLC; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RC11-1-002; Docket No. RC11-2-002] Cedar Creek Wind Energy, LLC, Milford Wind Corridor Phase I, LLC; Notice of Filing Take...) June 16, 2011 Order.\\1\\ \\1\\ Cedar Creek Wind Energy, LLC and Milford Wind Corridor Phase I, LLC, 135...

  19. Economic Cost of Crashes in Idaho

    DOT National Transportation Integrated Search

    2016-06-01

    The Idaho Transportation Departments Office of Highway Safety contracted with Cambridge Systematics (CS) for an assessment of the feasibility of calculating the Idaho-specific economic and comprehensive costs associated with vehicle crashes. Resea...

  20. 77 FR 60981 - TGP Granada, LLC and Roosevelt Wind Ranch, LLC v. Public Service Company of New Mexico, Tortoise...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    ...; EL12-43-000, EL12-43-001 TGP Granada, LLC and Roosevelt Wind Ranch, LLC v. Public Service Company of New Mexico, Tortoise Capital Resources Corp.; TGP Granada, LLC and Roosevelt Wind Ranch, LLC; Notice... over capacity on the Eastern Interconnection Project. \\1\\ TGP Granada, LLC v. Pub. Serv. Co. of New...

  1. 75 FR 34170 - Plastic Omnium Automotive Exteriors, LLC, Anderson, SC; Plastic Omnium Automotive Exteriors, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ... Omnium Automotive Exteriors, LLC, Anderson, SC; Plastic Omnium Automotive Exteriors, LLC, Troy, MI... the Anderson, South Carolina location of Plastic Omnium Automotive Exteriors, LLC, working out of Troy... certification to include workers in support of the Anderson, South Carolina facility working out of Troy...

  2. 75 FR 44984 - IDAHO: Filing of Plats of Survey

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-30

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLID9570000.LL14200000.BJ0000] IDAHO: Filing... lands described below in the BLM Idaho State Office, Boise, Idaho, effective 9 a.m., on the dates specified. FOR FURTHER INFORMATION CONTACT: Bureau of Land Management, 1387 South Vinnell Way, Boise, Idaho...

  3. 75 FR 8645 - South Central Idaho Resource Advisory Council

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-25

    ... Central Idaho Resource Advisory Council AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY: The South Central Idaho RAC will meet in Twin Falls, Idaho. The committee is meeting as authorized... Springs Hotel, 1357 Blue Lakes Blvd. North, Twin Falls, Idaho 83301. Written comments should be sent to...

  4. 76 FR 42724 - Idaho: Filing of Plats of Survey

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-19

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLID9570000.LL14200000.BJ0000] Idaho: Filing... lands described below in the BLM Idaho State Office, Boise, Idaho, effective 9 a.m., on the dates specified. FOR FURTHER INFORMATION CONTACT: Bureau of Land Management, 1387 South Vinnell Way, Boise, Idaho...

  5. 75 FR 63852 - Idaho: Filing of Plats of Survey

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-18

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLID9570000.LL14200000.BJ0000] Idaho: Filing... lands described below in the BLM Idaho State Office, Boise, Idaho, effective 9 a.m., on the dates specified. FOR FURTHER INFORMATION CONTACT: Bureau of Land Management, 1387 South Vinnell Way, Boise, Idaho...

  6. 76 FR 4934 - Idaho: Filing of Plats of Survey

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-27

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLID9570000.LL14200000.BJ0000] Idaho: Filing... lands described below in the BLM Idaho State Office, Boise, Idaho, effective 9 a.m., on the dates specified. FOR FURTHER INFORMATION CONTACT: Bureau of Land Management, 1387 South Vinnell Way, Boise, Idaho...

  7. 76 FR 66322 - Idaho: Filing of Plats of Survey

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-26

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLID9570000.LL14200000.BJ0000] Idaho: Filing... lands described below in the BLM Idaho State Office, Boise, Idaho, effective 9 a.m., on the dates specified. FOR FURTHER INFORMATION CONTACT: Bureau of Land Management, 1387 South Vinnell Way, Boise, Idaho...

  8. 76 FR 80388 - IDAHO: Filing of Plats of Survey

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-23

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLID9570000.LL14200000.BJ0000] IDAHO: Filing... lands described below in the BLM Idaho State Office, Boise, Idaho, effective 9 a.m., on the date specified. FOR FURTHER INFORMATION CONTACT: Bureau of Land Management, 1387 South Vinnell Way, Boise, Idaho...

  9. 75 FR 12230 - Black Oak Energy, L.L.C., EPIC Merchant Energy, LP, SESCO Enterprises, LLC v. PJM Interconnection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-15

    ... Energy, L.L.C., EPIC Merchant Energy, LP, SESCO Enterprises, LLC v. PJM Interconnection, L.L.C.; Notice of Filing March 8, 2010. Take notice that on March 1, 2010, PJM Interconnection, L.L.C. filed a..., Order Accepting Compliance filing issued in this proceeding, Black Oak Energy, L.L.C., et al. v. PJM...

  10. 76 FR 25298 - Southwest Idaho Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-04

    ... DEPARTMENT OF AGRICULTURE Forest Service Southwest Idaho Resource Advisory Committee AGENCY... Forests' Southwest Idaho Resource Advisory Committee will conduct a business meeting. The meeting is open... Operations Center, 108 Spring Street, Cascade, Idaho. SUPPLEMENTARY INFORMATION: Agenda topics will include...

  11. Carrington Real Estate Services, LLC and Carrington Mortgage Services, LLC Information Sheet

    EPA Pesticide Factsheets

    Carrington Real Estate Services, LLC and Carrington Mortgage Services, LLC (the Company) is located in Anaheim, California. The settlement involves the sale of properties constructed prior to 1978, located in Bakersfield and Ridgecrest, California.

  12. 76 FR 4893 - FFP Missouri 13, LLC, Grays Hydro, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13763-000; Project No. 13772-000] FFP Missouri 13, LLC, Grays Hydro, LLC; Notice Announcing Preliminary Permit Drawing January... No. 13763-000, and Grays Hydro, LLC, for Project No. 13772-000. \\1\\ The Commission is open each day...

  13. 75 FR 56085 - Michigan Consolidated Gas Company; Enterprise Texas Pipeline LLC; Enogex LLC; Public Service...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-15

    ... Storage and Transportation, L.P.; Hattiesburg Industrial Gas Sales, L.L.C.; Notice of Baseline Filings...; (Not Consolidated)] Michigan Consolidated Gas Company; Enterprise Texas Pipeline LLC; Enogex LLC... Gas Policy Act of 1978 (NGPA). Any person desiring to participate in this rate proceeding must file a...

  14. 78 FR 21968 - Idaho: Filing of Plats of Survey

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLID9570000.LL14200000.BJ0000] Idaho: Filing... lands described below in the BLM Idaho State Office, Boise, Idaho, effective 9:00 a.m., on the dates specified. FOR FURTHER INFORMATION CONTACT: Bureau of Land Management, 1387 South Vinnell Way, Boise, Idaho...

  15. 77 FR 64351 - Idaho: Filing of Plats of Survey

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-19

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLID9570000.LL14200000.BJ0000] Idaho: Filing... lands described below in the BLM Idaho State Office, Boise, Idaho, effective 9:00 a.m., on the dates specified. FOR FURTHER INFORMATION CONTACT: Bureau of Land Management, 1387 South Vinnell Way, Boise, Idaho...

  16. 77 FR 77089 - Idaho: Filing of Plats of Survey

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-31

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLID9570000.LL14200000.BJ0000] Idaho: Filing... lands described below in the BLM Idaho State Office, Boise, Idaho, effective 9:00 a.m., on the dates specified. FOR FURTHER INFORMATION CONTACT: Bureau of Land Management, 1387 South Vinnell Way, Boise, Idaho...

  17. 75 FR 66788 - Idaho: Filing of Plats of Survey

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLID9570000.LL14200000.BJ0000] Idaho: Filing... described below in the BLM Idaho State Office, Boise, Idaho, effective 9:00 a.m., on the date specified. FOR FURTHER INFORMATION CONTACT: Bureau of Land Management, 1387 South Vinnell Way, Boise, Idaho 83709-1657...

  18. 75 FR 27813 - IDAHO: Filing of Plats of Survey

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLID9570000.LL14200000.BJ0000] IDAHO: Filing... lands described below in the BLM Idaho State Office, Boise, Idaho, effective 9:00 a.m., on the dates specified. FOR FURTHER INFORMATION CONTACT: Bureau of Land Management, 1387 South Vinnell Way, Boise, Idaho...

  19. 76 FR 73612 - Lock Hydro Friends Fund XVIII; Upper Hydroelectric LLC; FFP Project 95 LLC; Riverbank Hydro No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14261-000; 14268-000; 14277-000; 14281-000] Lock Hydro Friends Fund XVIII; Upper Hydroelectric LLC; FFP Project 95 LLC... Friends Fund XVIII (Lock Hydro), Upper Hydroelectric LLC (Upper Hydro), Riverbank Hydro No. 25 LLC...

  20. 78 FR 62344 - Sabine Pass Liquefaction Expansion, LLC, Sabine Pass Liquefaction, LLC, and Sabine Pass LNG, L.P...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-18

    .... CP13-553-000] Sabine Pass Liquefaction Expansion, LLC, Sabine Pass Liquefaction, LLC, and Sabine Pass... 30, 2013, Sabine Pass Liquefaction Expansion, LLC, Sabine Pass Liquefaction, LLC, and Sabine Pass LNG, L.P. (collectively referred to as Sabine Pass) filed with the Federal Energy Regulatory Commission...

  1. 76 FR 18153 - Southwest Idaho Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-01

    ... DEPARTMENT OF AGRICULTURE Forest Service Southwest Idaho Resource Advisory Committee AGENCY... Forests' Southwest Idaho Resource Advisory Committee will conduct a business meeting. The meeting is open to the public. DATES: Thursday, April 21, 2011, beginning at 9 a.m. ADDRESSES: Idaho Counties Risk...

  2. 78 FR 24381 - Southwest Idaho Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-25

    ... DEPARTMENT OF AGRICULTURE Forest Service Southwest Idaho Resource Advisory Committee AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY: The Southwest Idaho Resource Advisory Committee (RAC) will meet in Boise, Idaho. The RAC is authorized under the Secure Rural Schools and Community...

  3. 75 FR 16449 - Central Transmission, LLC v. PJM Interconnection L.L.C.; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-52-000] Central Transmission, LLC v. PJM Interconnection L.L.C.; Notice of Complaint March 26, 2010. Take notice that on March... Interconnection L.L.C. (PJM) pursuant to section 206 of the Federal Power Act (FPA), alleging that Schedule 6 of...

  4. 75 FR 32210 - United States v. Idaho Orthopaedic Society, Timothy Doerr, Jeffrey Hessing, Idaho Sports Medicine...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-07

    ..., Jeffrey Hessing, Idaho Sports Medicine Institute, John Kloss, David Lamey, and Troy Watkins; Proposed... Sports Medicine Institute, John Kloss, David Lamey, and Troy Watkins, Civil Case No. 10-268. On May 28..., Jeffrey Hessing, Idaho Sports Medicine Institute, John Kloss, David Lamey, and Troy Watkins, Defendants...

  5. 75 FR 16091 - Glen Falls Hydro, LLC; Essex Energy Partners, LLC; Notice of Application for Transfer of License...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 11143-020] Glen Falls Hydro, LLC; Essex Energy Partners, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene March 24, 2010. On March 8, 2010, Glen Falls Hydro, LLC (transferor) and Essex Energy Partners, LLC (transferee) filed...

  6. 77 FR 27763 - Quantum Choctaw Power, LLC, USG Nevada LLC, et al.; Notice of Effectiveness of Exempt Wholesale...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. EG12-31-000; EG12-32-000; et al.] Quantum Choctaw Power, LLC, USG Nevada LLC, et al.; Notice of Effectiveness of Exempt Wholesale Generator Status Docket Nos. Quantum Choctaw Power, LLC EG12-31-000 USG Nevada LLC EG12-32-000...

  7. 77 FR 2287 - FFP Project 6, LLC and Northland Power Mississippi River LLC; Notice Announcing Preliminary...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 12848-002 and 14081-000] FFP Project 6, LLC and Northland Power Mississippi River LLC; Notice Announcing Preliminary Permit... Orleans, in Orleans Parish, Louisiana. The applications were filed by FFP Project 6, LLC for Project No...

  8. 76 FR 67174 - Arkansas Electric Cooperative Corp., Riverbank Hydro No. 9 LLC, Solia 3 Hydroelectric LLC, Lock...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... Hydroelectric LLC, Lock Hydro Friends Fund XLV, FFP Project 2 LLC; Notice of Competing Preliminary Permit... (Riverbank) and Solia 3 Hydroelectric LLC (Solia) and on May 3, 2011, Lock Hydro Friends Fund XLV (Lock Hydro...

  9. 75 FR 53964 - Idaho Power Company, Idaho; Notice of Availability of Final Environmental Impact Statement for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 503-048] Idaho Power Company, Idaho; Notice of Availability of Final Environmental Impact Statement for the Swan Falls Project August 26, 2010. In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC'...

  10. 75 FR 12230 - Idaho Power Company, Idaho; Notice of Availability of Draft Environmental Impact Statement for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 503-048] Idaho Power Company, Idaho; Notice of Availability of Draft Environmental Impact Statement for the Swan Falls Project March 5, 2010. In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's (Commission or FERC's)...

  11. 77 FR 63874 - Birds Eye Foods, LLC; Fulton, NY Plant; A Wholly-Owned Subsidiary of Pinnacle Foods Group LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-17

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-81,009] Birds Eye Foods, LLC... workers of Birds Eye Foods, LLC, Fulton, NY Plant, a wholly-owned subsidiary of Pinnacle Foods Group LLC... Eye Foods, LLC. The Department has determined that these workers were sufficiently under the control...

  12. 76 FR 67171 - Solia 7 Hydroelectric LLC; Riverbank Hydro No. 20 LLC; Lock Hydro Friends Fund XLIII; FFP Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14163-000; 14174-000; 14181-000; 14195-000] Solia 7 Hydroelectric LLC; Riverbank Hydro No. 20 LLC; Lock Hydro Friends Fund... LLC (Solia), and Riverbank Hydro No. 20 LLC (Riverbank), and on May 3, 2011, Lock Hydro Friends Fund...

  13. Idaho still attractive to industry

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stremel, K.

    1984-01-01

    Idaho continues to attract operators willing to gamble millions in the hope of establishing the first commercial production in the state. Low well density compounds the complexity of Idaho's geology. Projections are that at least three wildcats will be drilled in the Bear Lake County this year. Plans are to continue infill seismic work on the Overthrust acreage, where significant amount of reconnaissance lines has been shot.

  14. 77 FR 10741 - Lock+ Hydro Friends Fund XII, BOST2, LLC, Riverbank Hydro No. 21, LLC, FFP Project 96, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14260-000, 14264-000, 14267-000, 14273-000] Lock+ Hydro Friends Fund XII, BOST2, LLC, Riverbank Hydro No. 21, LLC, FFP Project... Greene and Hale counties, Alabama. The applications were filed by Lock+ Hydro Friends Fund XII for...

  15. 76 FR 6612 - Lock+ Hydro Friends Fund XL; FFP Missouri 4, LLC; Allegheny 4 Hydro, LLC; Three Rivers Hydro, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13746-000; Project No. 13750-000; Project No. 13776-000; Project No. 13782-000] Lock+ Hydro Friends Fund XL; FFP Missouri 4..., LLC--Project No. 13750-000 3. Allegheny 4 Hydro, LLC--Project No. 13776-000 4. Lock+ Hydro Friends...

  16. 75 FR 20389 - Chrysler Group LLC, Formerly Known as Chrysler LLC, Warren Office Building, Including On-Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-19

    ... certification to include workers leased from Product Action International, LLC working on-site at the Warren..., Formerly Known as Chrysler LLC, Warren Office Building, Including On-Site Leased Workers from Product Action International, LLC, Warren, Michigan; Amended Certification Regarding Eligibility To Apply for...

  17. 76 FR 12954 - PPL EnergyPlus, LLC v. PJM Interconnection, L.L.C.; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11-25-000] PPL EnergyPlus, LLC v. PJM Interconnection, L.L.C.; Notice of Complaint Take notice that on March 2, 2011, PPL Energy... Interconnection, L.L.C. (PJM or Respondent), alleging that PJM failed to conduct its annual financial transmission...

  18. 77 FR 2290 - FFP Project 18, LLC, Northland Power Mississippi River LLC; Notice Announcing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-17

    .... 14073-000] FFP Project 18, LLC, Northland Power Mississippi River LLC; Notice Announcing Preliminary... Parish, Louisiana. The applications were filed by FFP Project 18, LLC for Project No. 12857-002, and.... on the next regular business day. 18 CFR 385.2001(a)(2) (2011). On January 17, 2012, at 9 a.m...

  19. Weed hosts Globodera pallida from Idaho

    USDA-ARS?s Scientific Manuscript database

    The potato cyst nematode, Globodera pallida (PCN), a restricted pest in the USA, was first reported in Bingham and Bonneville counties of Idaho in 2006. The US government and Idaho State Department of Agriculture hope to eradicate it from infested fields. Eradicating PCN will require depriving the n...

  20. 78 FR 5798 - Grouse Creek Wind Park, LLC, Grouse Creek Wind Park II, LLC; Notice of Petition for Enforcement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. El13-39-000, QF11-32-001, QF11-33-001] Grouse Creek Wind Park, LLC, Grouse Creek Wind Park II, LLC; Notice of Petition for... Policies Act of 1978 (PURPA), Grouse Creek Wind Park, LLC and Grouse Creek Wind Park II, LLC filed a...

  1. 78 FR 34091 - Wausau Paper Mills, LLC; Specialty Papers Acquisition, LLC; Notice of Application for Transfer of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 2161-034; 2207-045] Wausau Paper Mills, LLC; Specialty Papers Acquisition, LLC; Notice of Application for Transfer of Licenses, and Soliciting Comments and Motions To Intervene On April 22, 2013, Wausau Paper Mills, LLC (transferor) and...

  2. 78 FR 49509 - Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice Announcing Preliminary Permit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 13625-003; Project No. 14504-000] Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice Announcing Preliminary Permit... and Jefferson County, Ohio. The applications were filed by Lock+ Hydro Friends Fund XXX, LLC for...

  3. The Idaho cobalt belt

    USGS Publications Warehouse

    Bookstrom, Arthur A.

    2013-01-01

    The Idaho cobalt belt (ICB) is a northwest-trending belt of cobalt (Co) +/- copper (Cu)-bearing deposits and prospects in the Salmon River Mountains of east-central Idaho, U.S.A. The ICB is about 55 km long and 10 km long in its central part, which contains multiple strata-bound ore zones in the Blackbird mine area. The Black Pine and Iron Creek Co-Cu prospects are southeast of Blackbird, and the Tinkers Pride, Bonanza Copper, Elk Creek, and Salmon Canyon Copper prospects are northwest of Blackbird.

  4. 77 FR 34031 - Petal Gas Storage, L.L.C., Hattiesburg Industrial Gas Sales, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-08

    ... Storage, L.L.C., Hattiesburg Industrial Gas Sales, L.L.C.; Notice of Application Take notice that on May 21, 2012, Petal Gas Storage, L.L.C. (Petal) and Hattiesburg Industrial Gas Sales, L.L.C. (Hattiesburg... pursuant to sections 7(c) and 7(b) of the Natural Gas Act (NGA), for authorization for Petal to acquire the...

  5. 76 FR 13667 - Chrysler Group LLC; Formerly Known as Chrysler LLC; Kenosha Engine Plant; Including On-Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-14

    ...; Formerly Known as Chrysler LLC; Kenosha Engine Plant; Including On-Site Leased Workers From Caravan Knight..., K+S Services, Inc., G4S Secure Solutions, Crassociates, Inc., CES, INC., Evans Distribution Systems... of Chrysler Group, LLC, formerly known as Chrysler, LLC, Kenosha Engine Plant, Kenosha, Wisconsin...

  6. 75 FR 24747 - SCI, LLC/Zener-Rectifier Operations Division A Wholly Owned Subsidiary of SCI, LLC/ON...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-70,235] SCI, LLC/Zener-Rectifier... Adjustment Assistance on October 19, 2009, applicable to workers of SCI LLC/Zener-Rectifier, Operations... Technical Resources were employed on-site at the Phoenix Arizona location of SCI LLC/Zener-Rectifier...

  7. 77 FR 48950 - South Central Idaho Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-15

    ... DEPARTMENT OF AGRICULTURE Forest Service South Central Idaho Resource Advisory Committee AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY: The South Central Idaho Resource Advisory Committee will meet in Jerome, Idaho. The committee is authorized under the Secure Rural Schools and...

  8. 76 FR 50452 - South Central Idaho Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-15

    ... DEPARTMENT OF AGRICULTURE South Central Idaho Resource Advisory Committee AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY: The South Central Idaho Resource Advisory Committee will meet in Jerome, Idaho. The committee is authorized under the Secure Rural Schools and Community Self...

  9. 76 FR 67169 - Solia 9 Hydroelectric LLC Riverbank Hydro No. 17 LLC Lock Hydro Friends Fund XLI FFP Project 54...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14162-000; 14173-000; 14182-000; 14192-000] Solia 9 Hydroelectric LLC Riverbank Hydro No. 17 LLC Lock Hydro Friends Fund XLI... LLC (Solia), and Riverbank Hydro No. 17 LLC (Riverbank), and on May 3, 2011, Lock Hydro Friends Fund...

  10. 76 FR 6612 - Lock Hydro Friends Fund XLIII; FFP Missouri 14, LLC; Solia 4 Hydroelectric, LLC; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13745-000; Project No. 13758-000; Project No. 13767-000] Lock Hydro Friends Fund XLIII; FFP Missouri 14, LLC; Solia 4... Hydroelectric, LLC--Project No. 13767-000 2. FFP Missouri 14, LLC--Project No. 13758-000 3. Lock Hydro Friends...

  11. 78 FR 23741 - North Central Idaho Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-22

    ... DEPARTMENT OF AGRICULTURE Forest Service North Central Idaho Resource Advisory Committee AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY: The North Central Idaho Resource Advisorsy Committee (RAC) will be meet in Grangeville, Idaho. The RAC is authorized under the Secure Rural Schools and...

  12. 77 FR 51967 - North Central Idaho Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-28

    ... DEPARTMENT OF AGRICULTURE Forest Service North Central Idaho Resource Advisory Committee AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY: The North Central Idaho RAC will be meeting via... held at the Nez Perce National Forest Supervisors Office, 104 Airport Road, Grangeville, Idaho. Written...

  13. 75 FR 4523 - North Central Idaho Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-28

    ... DEPARTMENT OF AGRICULTURE Forest Service North Central Idaho Resource Advisory Committee AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY: The North Central Idaho RAC will meet in Grangeville, Idaho. The committee is meeting as authorized under the Secure Rural Schools and Community Self...

  14. 77 FR 43236 - North Central Idaho Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    ... DEPARTMENT OF AGRICULTURE Forest Service North Central Idaho Resource Advisory Committee AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY: The North Central Idaho RAC will meet in Grangeville, Idaho. The committee is meeting as authorized under the Secure Rural Schools and Community Self...

  15. 75 FR 64691 - North Central Idaho Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-20

    ... DEPARTMENT OF AGRICULTURE Forest Service North Central Idaho Resource Advisory Committee AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY: The North Central Idaho RAC will meet in Potlatch, Idaho. The committee is meeting as authorized under the Secure Rural Schools and Community Self...

  16. 76 FR 1594 - North Central Idaho Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ... DEPARTMENT OF AGRICULTURE Forest Service North Central Idaho Resource Advisory Committee AGENCY: Forest Service, USDA. ACTION: Notice of meetings. SUMMARY: The North Central Idaho RAC will meet in Grangeville, Idaho. The committee is meeting as authorized under the Secure Rural Schools and Community Self...

  17. 76 FR 12933 - North Central Idaho Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-09

    ... DEPARTMENT OF AGRICULTURE Forest Service North Central Idaho Resource Advisory Committee AGENCY: Forest Service, USDA. ACTION: Notice of meetings. SUMMARY: The North Central Idaho RAC will meet in Grangeville, Idaho. The committee is meeting as authorized under the Secure Rural Schools and Community Self...

  18. Idaho Fires

    Atmospheric Science Data Center

    2014-05-15

    article title:  Wildfires in Northwestern United States     ... (MISR) image of smoke plumes from devastating wildfires in the northwestern United States. This view of the Clearwater and ... at JPL August 5, 2000 - Smoke plumes from wildfires in Idaho. project:  MISR category:  ...

  19. PES Holdings, LLC, et. al. Bankruptcy Renewable Fuel Standard Settlement

    EPA Pesticide Factsheets

    PES Holdings, LLC, North Yard Financing, LLC, North Yard GP, LLC, North Yard Logistics, L.P., PES Administrative Services, LLC, PES Logistics GP, LLC, PES Logistics Partners, L.P., Philadelphia Energy Solutions Refining and Marketing LLC (PESRM),

  20. Idaho Transportation Department 2011 customer satisfaction survey.

    DOT National Transportation Integrated Search

    2011-10-01

    In the spring and summer of 2011, the Idaho Transportation Department (ITD) commissioned a statewide customer satisfaction survey of Idaho residents to assess their perception of ITDs performance in several key areas of customer service. The areas...

  1. Looking southwest from Idaho Avenue showing east side and north ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Looking southwest from Idaho Avenue showing east side and north end with entrance - University of Idaho, University Classroom Building, Line Street between University Avenue & Idaho Avenue, Moscow, Latah County, ID

  2. Perspective view toward southwest from Idaho Avenue showing east side ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Perspective view toward southwest from Idaho Avenue showing east side and north end - University of Idaho, University Classroom Building, Line Street between University Avenue & Idaho Avenue, Moscow, Latah County, ID

  3. Idaho Transportation Department 2016 Customer Communication Survey

    DOT National Transportation Integrated Search

    2017-06-23

    In 2016, the Idaho Transportation Department contracted with the University of Idaho's Social Science Research Unit to conduct a survey on the general public's engagement and communication with the department. The goal of conducting this survey was t...

  4. 75 FR 5780 - Green Borders Geothermal, LLC, Complainant, v. Terra-Gen Dixie Valley, LLC, Respondent; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-36-000] Green Borders Geothermal, LLC, Complainant, v. Terra-Gen Dixie Valley, LLC, Respondent; Notice of Complaint January 28, 2010. Take notice that on January 25, 2010, Green Borders Geothermal, LLC (Green Borders) filed a formal complaint against Terra-Gen Dixie Valle...

  5. Confirmatory radiological survey of the BORAX-V turbine building Idaho National Engineering Laboratory, Idaho Falls, Idaho

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stevens, G.H.; Coleman, R.L.; Jensen, M.K.

    1993-07-01

    An independent assessment of the remediation of the BORAX-V (Boiling Water Reactor Experiment) turbine building at the Idaho National Engineering Laboratory (INEL), Idaho Falls, Idaho, was accomplished by the Oak Ridge National Laboratory Pollutant Assessments Group (ORNL/PAG). The purpose of the assessment was to confirm the site`s compliance with applicable Department of Energy guidelines. The assessment included reviews of both the decontamination and decommissioning Plan and data provided from the pre- and post-remedial action surveys and an independent verification survey of the facility. The independent verification survey included determination of background exposure rates and soil concentrations, beta-gamma and gamma radiationmore » scans, smears for detection of removable contamination, and direct measurements for alpha and beta-gamma radiation activity on the basement and mezzanine floors and the building`s interior and exterior walls. Soil samples were taken, and beta-gamma and gamma radiation exposure rates were measured on areas adjacent to the building. Results of measurements on building surfaces at this facility were within established contamination guidelines except for elevated beta-gamma radiation levels located on three isolated areas of the basement floor. Following remediation of these areas, ORNL/PAG reviewed the remedial action contractor`s report and agreed that remediation was effective in removing the source of the elevated direct radiation. Results of all independent soil analyses for {sup 60}Co were below the detection limit. The highest {sup 137}Cs analysis result was 4.6 pCi/g; this value is below the INEL site-specific guideline of 10 pCi/g.« less

  6. U.S. Geological Survey geohydrologic studies and monitoring at the Idaho National Laboratory, southeastern Idaho

    USGS Publications Warehouse

    Bartholomay, Roy C.

    2017-09-14

    BackgroundThe U.S. Geological Survey (USGS) geohydrologic studies and monitoring at the Idaho National Laboratory (INL) is an ongoing, long-term program. This program, which began in 1949, includes hydrologic monitoring networks and investigative studies that describe the effects of waste disposal on water contained in the eastern Snake River Plain (ESRP) aquifer and the availability of water for long-term consumptive and industrial use. Interpretive reports documenting study findings are available to the U.S. Department of Energy (DOE) and its contractors; other Federal, State, and local agencies; private firms; and the public at https://id.water.usgs.gov/INL/Pubs/index.html. Information contained within these reports is crucial to the management and use of the aquifer by the INL and the State of Idaho. USGS geohydrologic studies and monitoring are done in cooperation with the DOE Idaho Operations Office.

  7. State of Idaho Port of Entry Study

    DOT National Transportation Integrated Search

    2016-05-01

    The purpose of this study was to evaluate Idaho's Ports of Entry (POE) Program to identify its strengths and weaknesses, and provide recommendations for future program development and operations. As part of the study, current Idaho POE business proce...

  8. Idaho Transportation Department 2009 customer satisfaction survey.

    DOT National Transportation Integrated Search

    2010-02-01

    In the summer and fall of 2009, the Idaho Transportation Department (ITD) commissioned a statewide customer satisfaction survey of Idaho residents in order to assess the overall level of satisfaction with several key areas of service provided by the ...

  9. 78 FR 4842 - Linden VFT, LLC v. Brookfield Energy Marketing, LP, Cargill Power Markets, LLC; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL13-40-000] Linden VFT, LLC v. Brookfield Energy Marketing, LP, Cargill Power Markets, LLC; Notice of Complaint Take notice that... Brookfield Energy Marketing, LP and Cargill Power Markets, LLC (Respondents) alleging that, Respondents...

  10. Looking southeast from intersection of Idaho Avenue and Line Street ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Looking southeast from intersection of Idaho Avenue and Line Street showing north end and west front - University of Idaho, University Classroom Building, Line Street between University Avenue & Idaho Avenue, Moscow, Latah County, ID

  11. 75 FR 74000 - Idaho Panhandle Resource Advisory Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-30

    ... DEPARTMENT OF AGRICULTURE Forest Service Idaho Panhandle Resource Advisory Committee Meeting...-Determination Act of 2000 (Pub. L. 110-343) the Idaho Panhandle Resource Advisory Committee will meet Friday, December 3, 2010, at 9 a.m. in Coeur d'Alene, Idaho for a business meeting. The business meeting is open to...

  12. 76 FR 44030 - Idaho; Major Disaster and Related Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    .... FEMA-1987-DR; Docket ID FEMA-2011-0001] Idaho; Major Disaster and Related Determinations AGENCY... declaration of a major disaster for the State of Idaho (FEMA-1987-DR), dated May 20, 2011, and related... determined that the damage in certain areas of the State of Idaho resulting from flooding, landslides, and...

  13. Batelle Energy Alliance, LLC (BEA) 2014 Annual report for Idaho National Laboratory (INL)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alvarez, Juan; Allen, Todd

    2014-10-01

    This Fiscal Year (FY) 2014 annual report provides the Department of Energy (DOE) with BEA’s self-assessment of performance managing and operating the INL for the period ending September 30, 2014. After considering all of the information related to INL performance during the rating period against the Goals, Objectives and Notable Outcomes in the FY 2014 Performance Evaluation and Measurement Plan (PEMP), BEA believes it earned an overall grade closest to an A. The paragraphs below highlight how INL excelled in delivering innovative and impactful research across the three mission areas; how INL has successfully positioned itself for future growth andmore » sustainment; and how, through strong leadership, INL has set and implemented a strategic direction to ensure we meet and exceed the expectations of DOE and other customers. Attachments 1 through 5 provide additional detail on FY 2014 mission accomplishments, outline corporate contributions for success, highlight national and international awards and recognitions at the organization and individual levels, and describe the performance issues and challenges faced in FY 2014. • Attachment 1, “Self-Assessed PEMP Ratings” • Attachment 2, “INL Mission Accomplishments” • Attachment 3, “Battelle Energy Alliance, LLC Contributions to INL Success” • Attachment 4, “FY 2014 Awards, Recognition, Professional Roles and Certifications” • Attachment 5, “Performance Issues and Challenges.”« less

  14. 75 FR 76041 - Chrysler Group LLC Formerly Known as Chrysler LLC Kenosha Engine Plant Including On-Site Leased...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    ... Formerly Known as Chrysler LLC Kenosha Engine Plant Including On-Site Leased Workers From Caravan Knight..., K+S Services, Inc., G4S Secure Solutions, Crassociates, Inc., CES, Inc., Evans Distribution Systems..., LLC, formerly known as Chrysler, LLC, Kenosha Engine Plant, Kenosha, Wisconsin (subject firm). The...

  15. 77 FR 36041 - Nevada 5, Inc. and Oakland Transportation Holdings LLC-Control Exemption-GTR Leasing LLC and US...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35635] Nevada 5, Inc. and Oakland Transportation Holdings LLC--Control Exemption--GTR Leasing LLC and US Rail Holdings LLC \\1\\ \\1... date of the exemption (30 days after the verified notice was filed). Applicants represent that: (1) The...

  16. 77 FR 13317 - Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC, Riverbank Hydro No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14261-000, 14268-000, 14277-000, 14281-000] Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC.... Lock+ Hydro Friends Fund XVIII: Project No. 14261-000. 2. Riverbank Hydro No. 25, LLC: Project No...

  17. 75 FR 48984 - Idaho; Major Disaster and Related Determinations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-12

    .... FEMA-1927-DR; Docket ID FEMA-2010-0002] Idaho; Major Disaster and Related Determinations AGENCY... declaration of a major disaster for the State of Idaho (FEMA-1927-DR), dated July 27, 2010, and related... in certain areas of the State of Idaho resulting from severe storms and flooding during the period of...

  18. Alternative Fuels Data Center: Idaho Transportation Data for Alternative

    Science.gov Websites

    the National Renewable Energy Laboratory Case Studies Video thumbnail for Idaho National Laboratory Operating Costs and Emissions May 16, 2014 Video thumbnail for Republic Services Reduces Waste with 87 CNG Videos on YouTube Video thumbnail for Idaho Surges Ahead with Electric Vehicle Charging Idaho Surges

  19. Idaho-Montana Logging

    NASA Image and Video Library

    2013-12-16

    Logging operations have left a striking checkerboard pattern in the landscape along the Idaho-Montana border, sandwiched between Clearwater and Bitterroot National Forests as seen in this image acquired by NASA Terra spacecraft.

  20. 76 FR 73614 - Lock Hydro Friends Fund XII; BOST2 LLC; Riverbank Hydro No. 21 LLC; FFP Project 96 LLC; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14260-000; 14264-000; 14267-000; 14273-000] Lock Hydro Friends Fund XII; BOST2 LLC; Riverbank Hydro No. 21 LLC; FFP Project 96..., Motions To Intervene, and Competing Applications On September 1, 2011, Lock Hydro Friends Fund XII (Lock...

  1. 77 FR 11530 - Riverbank Hydro No. 2, LLC, Lock+ Hydro Friends Fund XXXVI, Qualified Hydro 21, LLC; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14130-000, 14137-000, 14134-000] Riverbank Hydro No. 2, LLC, Lock+ Hydro Friends Fund XXXVI, Qualified Hydro 21, LLC; Notice.... 2, LLC for Project No. 14130-000, Lock+ Hydro Friends Fund XXXVI for Project No. 14137-000, and...

  2. 76 FR 45248 - PJM Interconnection, L.L.C., PJM Power Providers Group v. PJM Interconnection, L.L.C...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-28

    ...-002; Docket No. EL11-20-001] PJM Interconnection, L.L.C., PJM Power Providers Group v. PJM Interconnection, L.L.C.; Supplemental Notice of Staff Technical Conference On June 13, 2011, the Commission issued... Resources Services, Inc., Maryland Public Service Commission, Monitoring Analytics, L.L.C., National Rural...

  3. 40 CFR 81.190 - Eastern Idaho Intrastate Air Quality Control Region.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 17 2010-07-01 2010-07-01 false Eastern Idaho Intrastate Air Quality... Quality Control Regions § 81.190 Eastern Idaho Intrastate Air Quality Control Region. The Eastern Idaho... outermost boundaries of the area so delimited): In the State of Idaho: Bannock County, Bear Lake County...

  4. 76 FR 66917 - Environmental Management Site-Specific Advisory Board, Idaho National Laboratory

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-28

    ... Office, 1955 Fremont Avenue, MS- 1203, Idaho Falls, Idaho 83415. Phone (208) 526-6518; Fax (208) 526... Treatment Project (AMWTP) Contract Idaho Cleanup Project (ICP) Contract Extension Idaho-EM Funding Status of...

  5. 30 CFR 912.700 - Idaho Federal program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... seq. and Rules 1 through 20 promulgated thereunder pertaining to regulation of dredge mining. (6... Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR PROGRAMS FOR THE CONDUCT OF SURFACE MINING OPERATIONS WITHIN EACH STATE IDAHO § 912.700 Idaho Federal...

  6. 77 FR 70434 - Petal Gas Storage, L.L.C., Hattiesburg Industrial Gas Sales, L.L.C.; Notice of Offer of Settlement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-26

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12-464-000] Petal Gas Storage, L.L.C., Hattiesburg Industrial Gas Sales, L.L.C.; Notice of Offer of Settlement Take notice that on November 8, 2012, Petal Gas Storage, L.L.C. (Petal) and Hattiesburg Industrial Gas Sales, L.L.C...

  7. WATER QUALITY STATUS REPORT, CROOKED RIVER, IDAHO COUNTY IDAHO, 1987

    EPA Science Inventory

    Crooked River (17060305), a primary anadromous fisheries resource, is located approximately 120 miles southeast of Lewiston, Idaho. Dredging operations between 1936 and 1948 left large piles of gravel in the natural watercourse, causing the river to meander. Impoundments of wat...

  8. 77 FR 39695 - HollyFrontier Refining and Marketing LLC v. Osage Pipe Line Company, LLC; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR12-21-000] HollyFrontier Refining and Marketing LLC v. Osage Pipe Line Company, LLC; Notice of Complaint Take notice that on June 25...; 18 CFR 343.1(a) and 343.2(c), HollyFrontier Refining and Marketing LLC (Complainant) filed a formal...

  9. A multioutput LLC-type parallel resonant converter

    NASA Astrophysics Data System (ADS)

    Liu, Rui; Lee, C. Q.; Upadhyay, Anand K.

    1992-07-01

    When an LLC-type parallel resonant converter (LLC-PRC) operates above resonant frequency, the switching transistors can be turned off at zero voltage. Further study reveals that the LLC-PRC possesses the advantage of lower converter voltage gain as compared with the conventional PRC. Based on analytic results, a complete set of design curves is obtained, from which a systematic design procedure is developed. Experimental results from a 150 W 150 kHz multioutput LLC-type PRC power supply are presented.

  10. 77 FR 47670 - RG Steel Sparrows Point LLC, Formerly Known as Severstal Sparrows Point LLC, a Subsidiary of RG...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-74,919] RG Steel Sparrows Point LLC, Formerly Known as Severstal Sparrows Point LLC, a Subsidiary of RG Steel LLC, Including All On-Site Leased Workers, Sparrows Point, MD; Amended Certification Regarding Eligibility To Apply for...

  11. 76 FR 67167 - Riverbank Hydro No. 1 LLC; Qualified Hydro 20 LLC; Lock Hydro Friends Fund XXXVII; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14131-000; 14135-000; 14138-000] Riverbank Hydro No. 1 LLC; Qualified Hydro 20 LLC; Lock Hydro Friends Fund XXXVII; Notice of... LLC (Qualified Hydro) and Lock Hydro Friends Fund XXXVI (Lock Hydro) filed preliminary permit...

  12. 76 FR 60557 - Environmental Assessment and Finding of No Significant Impact for a License Amendment to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ... Electric Company, LLC, Hematite Decommissioning Project, Hematite, MO AGENCY: Nuclear Regulatory Commission... (SNM) License number SNM-33, issued to Westinghouse Electric Company, LLC (WEC) to authorize... radioactively contaminated material by rail car to an offsite facility located in Idaho was also confirmed in...

  13. 76 FR 9540 - South Central Idaho Resource Advisory Committee; Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-18

    ... DEPARTMENT OF AGRICULTURE Forest Service South Central Idaho Resource Advisory Committee; Meeting AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY: The South Central Idaho Resource Advisory Committee will meet in Jerome, Idaho. The committee is meeting as authorized under the Secure...

  14. Brucellosis in elk of eastern Idaho.

    PubMed

    Etter, Ryan P; Drew, Mark L

    2006-04-01

    Brucellosis occurs in free-ranging elk (Cervus elaphus) and bison (Bison bison) in the Greater Yellowstone Area, which includes portions of Idaho, Wyoming, and Montana. Brucella abortus was first detected in elk in Idaho in 1998, and from 1998 to 2002, serologic surveillance of hunter-killed elk was conducted in northeastern and southeastern Idaho. Prevalence of antibodies in these elk varied annually, but averaged between 2% and 3%. Elk were also trapped in northeastern Idaho from 1998-2002 and tested for brucellosis using serology and tissue culture. In areas where artificial feeding of elk was done, antibody prevalence ranged from 12% to 80% depending on site, age, and sex. At one feeding site (Rainey Creek), a decline in the prevalence of antibodies (from 56.8% in 1999 to 13.5% in 2002) was detected after the removal of seropositive elk over 4 yr. Seropositive elk removed from two artificial winter feeding sites (Rainey Creek and Conant Creek) were euthanized and sampled or held in captivity and allowed to calve prior to euthanasia and necropsy. At necropsy, B. abortus biovar 1 and B. abortus biovar 4 were isolated from both cows and calves; however, biovar 4 was predominant. A dual infection with both biovars was found in one calf born to a seropositive cow from which biovar 4 was isolated. Abortions (16%), stillbirths (8%), and weak calves (4%) were observed in these elk. These findings confirm the presence of brucellosis in elk in eastern Idaho and provide information on disease management options.

  15. 76 FR 67174 - Solia 2 Hydroelectric LLC; Riverbank Hydro No. 7 LLC; Lock Hydro Friends Fund XXXVIII Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14157-000; 14161-000; 14184-000] Solia 2 Hydroelectric LLC; Riverbank Hydro No. 7 LLC; Lock Hydro Friends Fund XXXVIII Notice.... 7 LLC (Riverbank) and on May 3, 2011, Lock Hydro Friends Fund XXXVIII (Lock Hydro) filed preliminary...

  16. 78 FR 36017 - MCM Rail Services LLC, d/b/a Baltimore Industrial Railroad-Operation Exemption-Hilco SP Rail, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-14

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35725] MCM Rail Services LLC, d/b/a Baltimore Industrial Railroad-- Operation Exemption--Hilco SP Rail, LLC MCM Rail Services LLC, d/b/a Baltimore Industrial Railroad (MCM), a noncarrier, has filed a verified notice of exemption...

  17. Assessing the Idaho Transportation Department's customer service performance.

    DOT National Transportation Integrated Search

    2011-10-23

    This report assesses customer satisfaction with the Idaho Transportation Department. It also compares and contrasts the results of customer satisfaction surveys conducted for the Idaho Transportation Department with the results from other state trans...

  18. 75 FR 24685 - Environmental Management Site-Specific Advisory Board, Idaho National Laboratory

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Idaho National... meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Idaho National Laboratory... prior to the meeting. ADDRESSES: Hilton Garden Inn, 700 Lindsay Boulevard, Idaho Falls, Idaho 83402. FOR...

  19. 77 FR 13316 - FFP Project 91, LLC, Riverbank Hydro No. 23, LLC, Lock+ Hydro Friends Fund III; Notice Announcing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14275-000, 14279-000, 14282-000] FFP Project 91, LLC, Riverbank Hydro No. 23, LLC, Lock+ Hydro Friends Fund III; Notice.... 2. Riverbank Hydro No. 23, LLC: Project No. 14279-000. 3. Lock+ Hydro Friends Fund III: Project No...

  20. 76 FR 67176 - Riverbank Hydro No. 13 LLC, Lock Hydro Friends Fund XXXIV, FFP Project 55 LLC; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14168-000, 14187-000 and 14199-000] Riverbank Hydro No. 13 LLC, Lock Hydro Friends Fund XXXIV, FFP Project 55 LLC; Notice of..., Lock Hydro Friends Fund XXXIV (Lock Hydro), and FFP Project 55 LLC (FFP 55) filed preliminary permit...

  1. 76 FR 67168 - Riverbank Hydro No. 19 LLC; Lock Hydro Friends Fund XXXIV; FFP Project 59 LLC; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14176-000, 14188-000, 14200-000] Riverbank Hydro No. 19 LLC; Lock Hydro Friends Fund XXXIV; FFP Project 59 LLC; Notice of..., Lock Hydro Friends Fund XXXIV (Lock Hydro), and FFP Project 59 LLC (FFP 59) filed preliminary permit...

  2. 76 FR 508 - Approval and Promulgation of Implementation Plans; Idaho

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-05

    ... Promulgation of Implementation Plans; Idaho AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Idaho State Implementation Plan (SIP) that were submitted to EPA by the State of Idaho on April 16, 2007. This SIP submittal includes new and...

  3. 36 CFR 294.26 - Other activities in Idaho Roadless Areas.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Motorized travel. Nothing in this subpart shall be construed as affecting existing roads or trails in Idaho Roadless Areas. Decisions concerning the future management of existing roads or trails in Idaho Roadless... subpart shall be construed as affecting existing grazing permits in Idaho Roadless Areas. Future road...

  4. 77 FR 42831 - Professional Transportation, Inc.-Asset Acquisition-CUSA ES, LLC and CUSA CSS, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-20

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. MCF 21046] Professional Transportation, Inc.--Asset Acquisition--CUSA ES, LLC and CUSA CSS, LLC AGENCY: Surface Transportation Board, Department of Transportation. ACTION: Correction to Notice of Finance Application. On June 29, 2012, notice...

  5. IDAHO WILDERNESS, IDAHO.

    USGS Publications Warehouse

    Cater, Fred W.; Weldin, R.D.

    1984-01-01

    Mineral surveys conducted in the Idaho Wilderness identified 28 areas with probable or substantiated mineral-resource potential, and 5 mines with demonstrated or inferred resources. Metals including gold, silver, copper, lead, zinc, and tungsten, have been extracted from deposits inside the wilderness. Current studies indicate additional areas of probable mineral-resource potential for gold, tungsten, mercury, rare-earth elements, and base metals related to intrusive rocks that follow structures formed by cauldron subsidence. These on-going studies also indicate that there is probable and substantiated resource potential for cobalt with copper, silver, and gold in the Precambrian rocks in the northeastern part of the wilderness in a geologic environment similar to that of the Blackbird mine that lies outside the area. The nature of the geologic terrane precludes the potential for organic fuels.

  6. 75 FR 11916 - Chrysler Group LLC, Formerly Known as Chrysler LLC, Conner Avenue Assembly Plant, Including On...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-12

    ..., CDI, Syncreon and Caravan Knight Facilities Management LLC; Detriot, MI; Amended Certification... workers from Aerotek, CDI, Syncreon and Caravan Knight Facilities Management LLC, Detroit, Michigan, who...

  7. 75 FR 11872 - Environmental Management Site-Specific Advisory Board, Idaho National Laboratory

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-12

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Idaho National... Site- Specific Advisory Board, Idaho National Laboratory to be held on March 16, 2010 75 FR 9590. In that notice, the meeting address was Hilton Garden Inn, 700 Lindsay Boulevard, Idaho Falls, Idaho 83402...

  8. 76 FR 71353 - Idaho: Notice of Filing of Decision Document

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-17

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLID9570000.LL14200000.BJ0000] Idaho: Notice... 15, 2011, in the BLM Idaho State Office. This report contains two survey decisions related to Grays... Cadastral Survey, Bureau of Land Management, 1387 South Vinnell Way, Boise, Idaho, 83709-1657. FOR FURTHER...

  9. Growing the Idaho economy : moving into the future.

    DOT National Transportation Integrated Search

    2010-08-13

    A report on transportation and the possible future economy of the State of Idaho from 2010 to 2030, including : current assets to leverage, driving forces shaping the future, long-range economic opportunities for Idaho including : four future scenari...

  10. 76 FR 46793 - PJM Interconnection, L.L.C.; PJM Power Providers Group v. PJM Interconnection, L.L.C.; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-03

    ...-002; Docket No. EL11-20-001] PJM Interconnection, L.L.C.; PJM Power Providers Group v. PJM Interconnection, L.L.C.; Notice Establishing Post-Technical Comment Period As indicated in the June 29, 2011... issues related to PJM Interconnection, L.L.C. (PJM)'s Minimum Offer Price Rule (MOPR) and resources...

  11. Alternative Fuels Data Center: Idaho Surges Ahead with Electric Vehicle

    Science.gov Websites

    Charging Idaho Surges Ahead with Electric Vehicle Charging to someone by E-mail Share Alternative Fuels Data Center: Idaho Surges Ahead with Electric Vehicle Charging on Facebook Tweet about Alternative Fuels Data Center: Idaho Surges Ahead with Electric Vehicle Charging on Twitter Bookmark

  12. 40 CFR 272.651 - Idaho State-Administered Program: Final Authorization.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Idaho § 272.651 Idaho..., 2008. (b) The State of Idaho has primary responsibility for enforcing its hazardous waste management... part of the hazardous waste management program under subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i...

  13. 40 CFR 272.651 - Idaho State-Administered Program: Final Authorization.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Idaho § 272.651 Idaho..., 2008. (b) The State of Idaho has primary responsibility for enforcing its hazardous waste management... part of the hazardous waste management program under subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i...

  14. 40 CFR 272.651 - Idaho State-Administered Program: Final Authorization.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Idaho § 272.651 Idaho..., 2008. (b) The State of Idaho has primary responsibility for enforcing its hazardous waste management... part of the hazardous waste management program under subtitle C of RCRA, 42 U.S.C. 6921 et seq. (i...

  15. 76 FR 73615 - FFP Project 91 LLC; Riverbank Hydro No. 23 LLC; Lock Hydro Friends Fund III; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14275-000; 14279-000; 14282-000] FFP Project 91 LLC; Riverbank Hydro No. 23 LLC; Lock Hydro Friends Fund III; Notice of... LLC (Riverbank), and Lock Hydro Friends Fund III (Lock Hydro), filed preliminary permit applications...

  16. Idaho National Laboratory Cultural Resource Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Julie Braun Williams

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Officemore » will meet these responsibilities at Idaho National Laboratory in southeastern Idaho. The Idaho National Laboratory is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through regular reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  17. Idaho's Forest Products Industry: A Descriptive Analysis

    Treesearch

    Todd A. Morgan; Charles E. Keegan; Timothy P. Spoelma; Thale Dillon; A. Lorin Hearst; Francis G. Wagner; Larry T. DeBlander

    2004-01-01

    This report provides a description of the structure, capacity, and condition of Idaho's primary forest products industry; traces the flow of Idaho's 2001 timber harvest through the primary sectors; and quantifies volumes and uses of wood fiber. The economic contribution of the forest products industry to the State and historical industry changes are discussed...

  18. 77 FR 70478 - RG Steel Wheeling, LLC, Wheeling Office, A Division Of RG Steel, LLC, Including On-Site Leased...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-26

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-81,880: TA-A-81,880A] RG Steel Wheeling, LLC, Wheeling Office, A Division Of RG Steel, LLC, Including On-Site Leased Workers From Pro Unlimited and Green Energy Initiatives LLC, Including Workers Whose Wages Were Reported Through Severstal Wheeling, Wheeling, WV: Mountain State...

  19. Alternative Fuels Data Center: Idaho Transports Mail and Reduces Emissions

    Science.gov Websites

    with Natural Gas Trucks Idaho Transports Mail and Reduces Emissions with Natural Gas Trucks to Natural Gas Trucks on Facebook Tweet about Alternative Fuels Data Center: Idaho Transports Mail and Reduces Emissions with Natural Gas Trucks on Twitter Bookmark Alternative Fuels Data Center: Idaho

  20. Subgroup Achievement and Gap Trends: Idaho, 2010

    ERIC Educational Resources Information Center

    Center on Education Policy, 2010

    2010-01-01

    This paper profiles the student subgroup achievement and gap trends in Idaho for 2010. Idaho showed improvement in reading and math in grade 8 at the basic, proficient, and advanced levels for Latino and white students, low income students, and boys and girls. The state has also made progress in narrowing achievement gaps between Latino and white…

  1. The Image of the University of Idaho: A Qualitative Exploration of the Perceptions of Southeastern Idaho Opinion Leaders and the Effectual Influence upon the Choices of Prospective University Students

    ERIC Educational Resources Information Center

    Skinner, Marc T.

    2010-01-01

    This study explored perceptions about the University of Idaho among southeastern Idaho opinion leaders through qualitative inquiry. For many years the University of Idaho has struggled to recruit and retain students from the southeastern region of Idaho. From data collected from focus groups, face to face interviews, and field observations five…

  2. 76 FR 67172 - Riverbank Hydro No. 16 LLC, Lock Hydro Friends Fund IV, FFP Project 55 LLC; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14167-000, 14185-000 and 14196-000] Riverbank Hydro No. 16 LLC, Lock Hydro Friends Fund IV, FFP Project 55 LLC; Notice of..., Lock Hydro Friends Fund IV (Lock Hydro), and FFP Project 55 LLC (FFP 55) filed preliminary permit...

  3. 76 FR 67169 - Riverbank Hydro No. 10 LLC Lock Hydro Friends Fund XL FFP Project 56 LLC; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14164-000; 14189-000; 14198-000] Riverbank Hydro No. 10 LLC Lock Hydro Friends Fund XL FFP Project 56 LLC; Notice of Competing... Hydro Friends Fund XL (Lock Hydro), and FFP Project 56 LLC (FFP 56) filed preliminary permit...

  4. 76 FR 67167 - Riverbank Hydro No. 6 LLC, Lock Hydro Friends Fund XLVII, FFP Project 52 LLC; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14172-000, 14178-000 and 14190-000] Riverbank Hydro No. 6 LLC, Lock Hydro Friends Fund XLVII, FFP Project 52 LLC; Notice of..., Lock Hydro Friends Fund XLVII (Lock Hydro), and FFP Project 52 LLC (FFP 52) filed preliminary permit...

  5. 75 FR 60138 - Chrysler Financial Services Americas, LLC, a Subsidiary of Finco Intermediate Holding Co., LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-29

    ... DEPARTMENT OF LABOR Employment and Training Administration [TA-W-73,458] Chrysler Financial Services Americas, LLC, a Subsidiary of Finco Intermediate Holding Co., LLC, Troy Customer Contact Center, Troy, Michigan; Notice of Affirmative Determination Regarding Application for Reconsideration By...

  6. 75 FR 17375 - Notice of Central Idaho Resource Advisory Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-06

    ... DEPARTMENT OF AGRICULTURE Forest Service Notice of Central Idaho Resource Advisory Committee... Self-Determination Act of 2000 (Pub. L. 110-343), the Salmon-Challis National Forest's Central Idaho..., Challis, Idaho. SUPPLEMENTARY INFORMATION: Agenda topics will include review of RAC 2010 projects...

  7. 76 FR 48801 - Notice of Central Idaho Resource Advisory Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-09

    ... DEPARTMENT OF AGRICULTURE Forest Service Notice of Central Idaho Resource Advisory Committee... Self-Determination Act of 2000 (Pub. L. 110-343), the Salmon-Challis National Forest's Central Idaho..., Challis, Idaho. SUPPLEMENTARY INFORMATION: Agenda topics will include, presentation of proposed projects...

  8. 75 FR 58347 - Notice of Central Idaho Resource Advisory Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-24

    ... DEPARTMENT OF AGRICULTURE Forest Service Notice of Central Idaho Resource Advisory Committee... Self-Determination Act of 2000 (Pub. L. 110-343), the Salmon-Challis National Forest's Central Idaho..., Idaho. SUPPLEMENTARY INFORMATION: Agenda topics will include review of RAC 2010 [[Page 58348

  9. 76 FR 67172 - Riverbank Hydro No. 8 LLC Lock Hydro Friends Fund XLIV FFP Project 51 LLC; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [14160-000; 14179-000; 14194-000] Riverbank Hydro No. 8 LLC Lock Hydro Friends Fund XLIV FFP Project 51 LLC; Notice of Competing Preliminary... Applications On May 2, 2011, Riverbank Hydro No. 8 LLC (Riverbank), and on May 3, 2011, Lock Hydro Friends Fund...

  10. 77 FR 54557 - Eastern Idaho Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-05

    ... DEPARTMENT OF AGRICULTURE Forest Service Eastern Idaho Resource Advisory Committee AGENCY: Forest Service, USDA. ACTION: Notice of meeting. SUMMARY: The Easern Idaho Resource Advisory Committee will meet... between 8 a.m. and 8 p.m., Eastern Standard Time, Monday through Friday. SUPPLEMENTARY INFORMATION: The...

  11. 75 FR 842 - Notice of Central Idaho Resource Advisory Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-06

    ... Central Idaho Resource Advisory Committee Meeting AGENCY: Forest Service, USDA. ACTION: Notice of Meeting... National Forest's Central Idaho Resource Advisory Committee will conduct a business meeting which is open.... South Zone Office, Highway 93, Challis, Idaho. SUPPLEMENTARY INFORMATION: Agenda topics will include...

  12. 76 FR 12691 - Notice of Southwest Idaho Resource Advisory Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ... Southwest Idaho Resource Advisory Committee Meeting AGENCY: Forest Service, USDA. ACTION: Notice of meeting... Boise, Payette, Salmon-Challis, and Sawtooth National Forests' Southwest Idaho Resource Advisory..., 2011, beginning at 9 a.m. ADDRESSES: Idaho Counties Risk Management Program Building, 3100 South Vista...

  13. Idaho National Engineering Laboratory Waste Management Operations Roadmap Document

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bullock, M.

    1992-04-01

    At the direction of the Department of Energy-Headquarters (DOE-HQ), the DOE Idaho Field Office (DOE-ID) is developing roadmaps for Environmental Restoration and Waste Management (ER&WM) activities at Idaho National Engineering Laboratory (INEL). DOE-ID has convened a select group of contractor personnel from EG&G Idaho, Inc. to assist DOE-ID personnel with the roadmapping project. This document is a report on the initial stages of the first phase of the INEL`s roadmapping efforts.

  14. Radionuclides in ground water at the Idaho National Engineering Laboratory, Idaho

    USGS Publications Warehouse

    Knobel, LeRoy L.; Mann, Larry J.

    1988-01-01

    Sampling for radionuclides in groundwater was conducted at the Idaho National Engineering Laboratory during September to November 5 1987. Water samples from 80 wells that obtain water from the Snake River Plain aquifer and 1 well that obtains water from a shallow, discontinuous perched-water body at the Radioactive Waste Management Complex were collected and analyzed for tritium, strontium-90, plutonium-238, plutonium-239, -240 (undivided), americium-241, cesium-137, cobalt-60, and potassium-40--a naturally occurring radionuclide. The groundwater samples were analyzed at the Idaho National Engineering Laboratory in Idaho. Tritium and strontium-90 concentrations ranged from below the reporting level to 80.6 +/-0.000005 and 193 +/-5x10 to the minus eight micrograms Ci/ml, respectively. Water from a disposal well at Test Area North--which has not been used to dispose of waste water since September 1972--contained 122 +/-9x10 to the minus eleven micrograms Ci/ml of plutonium-238, 500 +/-20x10 to the minus eleven of plutonium-239, -240 (undivided), 21 +/-4x10 to the minus eleven micrograms Ci/ml of americium-241, and 750 +/-20x10 to the minus eight micrograms Ci/ml cesium-137; the presence of these radionuclides was verified by resampling and reanalysis. The disposal well had 8.9 +/-0.0000009 micrograms Ci/ml of cobalt-60 on October 28, 1987, but cobalt-60 was not detected when the well was resampled on January 11, 1988. Potassium-40 concentrations were less than the reporting level in all wells. (USGS)

  15. Idaho Science, Technology, Engineering and Mathematics Overview

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hampton, Brandon; Shoushtarian, Joannah; Ledoux, P

    2011-02-11

    Idaho National Laboratory has been instrumental in establishing the Idaho Science, Technology, Engineering and Mathematics initiative -- i-STEM, which brings together industry, educators, government and other partners to provide K-12 teachers with support, materials and opportunities to improve STEM instruction and increase student interest in technical careers. You can learn more about INL's education programs at http://www.facebook.com/idahonationallaboratory.

  16. Idaho Science, Technology, Engineering and Mathematics Overview

    ScienceCinema

    None

    2017-12-09

    Idaho National Laboratory has been instrumental in establishing the Idaho Science, Technology, Engineering and Mathematics initiative -- i-STEM, which brings together industry, educators, government and other partners to provide K-12 teachers with support, materials and opportunities to improve STEM instruction and increase student interest in technical careers. You can learn more about INL's education programs at http://www.facebook.com/idahonationallaboratory.

  17. 76 FR 67177 - Riverbank Hydro No. 18 LLC, Lock Hydro Friends Fund XXXV, FFP Project 57 LLC; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-31

    ...-000] Riverbank Hydro No. 18 LLC, Lock Hydro Friends Fund XXXV, FFP Project 57 LLC; Notice of Competing... Competing Applications On May 2, 2011, Riverbank Hydro No. 18 LLC (Riverbank), and on May 3, 2011, Lock... notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments...

  18. 77 FR 49826 - Notice of Public Meeting, Idaho Falls District Resource Advisory Council Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-17

    ... Public Meeting, Idaho Falls District Resource Advisory Council Meeting AGENCY: Bureau of Land Management... Interior, Bureau of Land Management (BLM) Idaho Falls District Resource Advisory Council (RAC), will meet as indicated below. DATES: The Idaho Falls District RAC will meet in Idaho Falls, Idaho on September...

  19. 75 FR 16070 - Notice of Southwest Idaho Resource Advisory Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-31

    ... DEPARTMENT OF AGRICULTURE Forest Service Notice of Southwest Idaho Resource Advisory Committee... National Forests' Southwest Idaho Resource Advisory Committee will conduct a business meeting. The meeting is open to the public. DATES: Thursday, April 15, 2010, beginning at 10:30 a.m. ADDRESSES: Idaho...

  20. 76 FR 6117 - Notice of Southwest Idaho Resource Advisory Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-03

    ... DEPARTMENT OF AGRICULTURE Forest Service Notice of Southwest Idaho Resource Advisory Committee... Sawtooth National Forests' Southwest Idaho Resource Advisory Committee will conduct a business meeting. The meeting is open to the public. DATES: Thursday, February 17, 2011, beginning at 9 a.m. ADDRESSES: Idaho...

  1. 75 FR 24879 - Notice of Southwest Idaho Resource Advisory Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-06

    ... DEPARTMENT OF AGRICULTURE Forest Service Notice of Southwest Idaho Resource Advisory Committee... National Forests' Southwest Idaho Resource Advisory Committee will conduct a business meeting. The meeting is open to the public. DATES: Thursday, May 20, 2010, beginning at 10:30 a.m. ADDRESSES: Idaho...

  2. 75 FR 68321 - Notice of Southwest Idaho Resource Advisory Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... DEPARTMENT OF AGRICULTURE Forest Service Notice of Southwest Idaho Resource Advisory Committee... National Forests' Southwest Idaho Resource Advisory Committee will conduct a business meeting. The meeting is open to the public. DATES: Tuesday November 9, 2010, beginning at 10:30 a.m. ADDRESSES: Idaho...

  3. 77 FR 17093 - Notice of Public Meeting, Idaho Falls District Resource Advisory Council

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-23

    ... Public Meeting, Idaho Falls District Resource Advisory Council AGENCY: Bureau of Land Management... Interior, Bureau of Land Management (BLM) Idaho Falls District Resource Advisory Council (RAC), will meet as indicated below. DATES: The Idaho Falls District RAC will meet in Salmon, Idaho on April 24-25...

  4. 76 FR 14898 - South Central Idaho Resource Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-18

    ... Committee will meet in Sun Valley, Idaho. The committee is meeting as authorized under the Secure Rural... will be held at the Sun Valley City Hall Council Chambers, 810 Elkhorn Road, Sun Valley, Idaho 83353...

  5. 77 FR 44579 - Notice of Idaho Panhandle Resource Advisory Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-30

    ... Idaho Panhandle Resource Advisory Committee Meeting AGENCY: Forest Service, USDA. ACTION: Notice of... under the Secure Rural Schools and Community Self-Determination Act of 2000 (Pub. L. 110-343) the Idaho..., Idaho for a business meeting. The business meeting is open to the public. DATES: August 24, 2012...

  6. 76 FR 29191 - Notice of Idaho Panhandle Resource Advisory Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-20

    ... DEPARTMENT OF AGRICULTURE Forest Service Notice of Idaho Panhandle Resource Advisory Committee... Self-Determination Act of 2000 (Pub. L. 110-343) the Idaho Panhandle Resource Advisory Committee will meet Friday, June 17, 2011, at 9 a.m. in Coeur d'Alene, Idaho for a business meeting. The business...

  7. 76 FR 52304 - Notice of Idaho Panhandle Resource Advisory Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-22

    ... DEPARTMENT OF AGRICULTURE Forest Service Notice of Idaho Panhandle Resource Advisory Committee... Self-Determination Act of 2000 (Pub. L. 110-343) the Idaho Panhandle Resource Advisory Committee will meet Friday, September 16, 2011, at 9 a.m. in Coeur d'Alene, Idaho for a business meeting. The business...

  8. Teton Dam flood of June 1976, Idaho Falls South quadrangle, Idaho

    USGS Publications Warehouse

    Ray, Herman A.; Matthai, Howard F.

    1976-01-01

    The failure of the Teton Dam caused extreme flooding along the Teton River, Henrys Fork, and Snake River in southeastern Idaho on June 5-8, 1976. No flooding occurred downstream from American Falls Reservoir. The inundated areas and maximum water-surface elevations are shown in a series of 17 hydrologic atlases. The area covered by the atlases extends from Teton Dam downstream to American Falls Reservoir, a distance of 100 miles. The extent of flooding shown on the maps was obtained by field inspections and aerial photographs made during and immediately after the flood. There may be small isolated areas within the boundaries shown that were not flooded, but the identification of these sites was beyond the scope of the study. The elevation data shown are mean-sea-level elevations of high-water marks identified in the field. This particular map (in the 17-map series) shows conditions in the Idaho Falls South quadrangle. (Woodard-USGS)

  9. Teton Dam flood of June 1976, Idaho Falls North quadrangle, Idaho

    USGS Publications Warehouse

    Ray, Herman A.; Matthai, Howard F.

    1976-01-01

    The failure of the Teton Dam caused extreme flooding along the Teton River, Henrys Fork, and Snake River in southeastern Idaho on June 5-8, 1976. No flooding occurred downstream from American Falls Reservoir. The inundated areas and maximum water-surface elevations are shown in a series of 17 hydrologic atlases. The area covered by the atlases extends from Teton Dam downstream to American Falls Reservoir, a distance of 100 miles. The extent of flooding shown on the maps was obtained by field inspections and aerial photographs made during and immediately after the flood. There may be small isolated areas within the boundaries shown that were not flooded, but the identification of these sites was beyond the scope of the study. The elevation data shown are mean-sea-level elevations of high-water marks identified in the field. This particular map (in the 17-map series) shows conditions in the Idaho Falls North quadrangle. (Woodard-USGS)

  10. 75 FR 69469 - Supermedia, LLC, Formerly Known as Idearc Media, LLC, a Subsidiary of Supermedia Information...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-12

    ... Known as Idearc Media, LLC, a Subsidiary of Supermedia Information Services, LLC, Troy, NY; Notice of... the findings that worker separations are not attributable to increased imports of articles like or directly competitive with telephone directories or a shift/acquisition of these articles to a foreign...

  11. 77 FR 76006 - Star Networks USA, LLC; Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-26

    ... CONSUMER PRODUCT SAFETY COMMISSION [CPSC Docket No. 13-2] Star Networks USA, LLC; Complaint AGENCY.... Published below is a Complaint: In the Matter of Star Networks USA, LLC.\\1\\ \\1\\ Chairman Inez M. Tenenbaum... COMMISSION In the Matter of STAR NETWORKS USA, LLC, Respondent CPSC DOCKET NO. 13-2 COMPLAINT Nature of...

  12. Stratigraphic section and selected semiquantitative chemistry, Meade Peak phosphatic shale member of Permian Phosphoria Formation, central part of Rasmussen Ridge, Caribou County, Idaho

    USGS Publications Warehouse

    Grauch, R.I.; Tysdal, R.G.; Johnson, E.A.; Herring, J.R.; Desborough, G.A.

    2001-01-01

    The U.S. Geological Survey (USGS) has studied the Permian Phosphoria Formation in southeastern Idaho and the entire Western U.S. Phosphate Field throughout much of the twentieth century. In response to a request by the U.S. Bureau of Land Management, a new series of resource, geological, and geoenvironmental studies was undertaken by the USGS in 1998. To accomplish these studies, the USGS has formed cooperative research relationships with two Federal agencies, the Bureau of Land Management and the U.S. Forest Service, tasked with land management and resource conservation on public lands; and with five private companies currently leasing or developing phosphate resources in southeastern Idaho. The companies are Agrium U.S. Inc. (Rasmussen Ridge mine) , Astaris LLC (Dry Valley mine), Rhodia Inc. (Wooley Valley mine, inactive), J.R. Simplot Company (Smoky Canyon mine), and Monsanto Co. (Enoch Valley mine). Some of the mineralogical research associated with this project is supported through a cooperative agreement with the Department of Geology and Geological Enginee ring, University of Idaho. Present studies consist of integrated, multidisciplinary research directed toward (1) resource and reserve estimations of phosphate in selected 7.5-minute quadrangles; (2) elemental residence, mineralogical and petrochemical characteristics; (3) mobilization and reaction pathways, transport, and fate of potentially toxic elements associated with the occurrence, development, and societal use of phosphate; (4) geophysical signatures; and (5) improving the understanding of deposit origin. Because raw data acquired during the project will require time to interpret, the data are released in open-file reports for prompt availability to other workers. Open-file reports associated with this series of studies are submitted to each of the Federal and industry cooperators for comment; however, the USGS is solely responsible for the data contained in the reports.

  13. 78 FR 42988 - Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE MKT LLC; Order Approving...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-18

    ...-2012-58] Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE MKT LLC; Order Approving... Related Supplementary Material July 12, 2013. I. Introduction On October 26, 2012, the New York Stock... cover the position only pursuant to a new order, which must be time-recorded upstairs and upon receipt...

  14. 77 FR 43591 - Tri-State Financial Co., LLC, (d/b/a North Country Ethanol), Red River Energy, LLC; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-25

    ... Financial Co., LLC, (d/b/a North Country Ethanol), Red River Energy, LLC; Notice of Filing Take notice that on July 10, 2012, Tri-State Financial Co., LLC, d/ b/a North Country Ethanol (Tri-State), and Red... the Tri- State's ethanol facility near Rosholt, in Roberts County, South Dakota (the Delivery Line...

  15. 77 FR 44677 - RG Steel Sparrows Point LLC, Formerly Known as Severstal Sparrows Point LLC, a Subsidiary of RG...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-30

    ... Leased Workers From Echelon Service Company, Sun Associated Industries, Inc., MPI Consultants LLC...-site leased workers from Echelon Service Company, Sun Associated Industries, Inc., MPI Consultants LLC...

  16. 77 FR 14011 - Rainbow Ranch Wind, LLC, Rainbow West Wind, LLC; Notice of Petition for Enforcement

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-08

    ... Commission (Commission) initiate an enforcement action against the Idaho Public Utilities Commission (Idaho... Nos. 32256 and 32300, as would allow Petitioners to pursue enforcement action in a U.S. Federal...). Protests will be considered by the Commission in determining the appropriate action to be taken, but will...

  17. Geology and ore deposits of the Casto quadrangle, Idaho

    USGS Publications Warehouse

    Ross, Clyde P.

    1934-01-01

    The study of the Casto quadrangle was undertaken as the first item in a project to obtain more thorough knowledge of the general geology of southcentral Idaho on which to base study of the ore deposits of t he region. The quadrangle conta ins fragmentary exposures of Algonkian and Paleozoic sedimentary rocks, extensive deposits of old volcanic strata, presumably Permian, not heretofore recognized in this part of Idaho, and a thick succession of Oligocene(?) lava and pyroclastic rocks. The Idaho batholith and its satellites extend into the quadrangle, and in addition there a re large masses of Tertiary granitic rock, not previously distinguished in Idaho, and many Tertiary dikes, some of which are genetically associated with contact-metamorphic deposits. The area contains injection gneiss of complex origin, largely related to the Idaho batholith but in part resulting from injection by ~he Tertiary granitic rocks under relatively light load. Orogenic movement took place in Algonkian, Paleozoic, and Tertiary time. There is a summit peneplain or par tial peneplain of Tertiary, perhaps Pliocene age, and the erosional history since its elevation has been complex. The ore deposits include lodes and placers. The lodes are related to both the Idaho batholith and the Tert iary intrusive rocks and have yielded gold and copper ore of a total value of about 1,000,000. Placers, largely formed in an interglacial inter val, have yielded about an equal amount. There has been some prospecting but almost no production since 1916.

  18. Idaho's forest products industry and timber harvest, 2006

    Treesearch

    Jason P. Brandt; Todd A. Morgan; Charles E. Keegan; Jon M. Songster; Timothy P. Spoelma; Larry T. DeBlander

    2012-01-01

    This report traces the flow of Idaho's 2006 timber harvest through the primary wood-using industries; describes the structure, capacity, and condition of Idaho's primary forest products industry; and quantifies volumes and uses of wood fiber. Wood products industry historical trends and changes in harvest, production, employment, and sales are also examined...

  19. New Nutrition Standards for Idaho School Meals. Nourishing News. Volume 4, Issue 1

    ERIC Educational Resources Information Center

    Idaho State Department of Education, 2009

    2009-01-01

    Idaho Child Nutrition Programs (CNP) released the New Nutrition Standards for Idaho School Meals in January 2009 with the recommendation that all School Food Authorities fully implement the New Nutrition Standards for Idaho School Meals into their programs starting August 2009. Along with the release of the New Nutrition Standards for Idaho School…

  20. Idaho judge rebuffs abortion funding rule.

    PubMed

    1994-07-22

    In a 3-page ruling on July 11, Ada County District Court Judge Duff McKee chastised Idaho officials for issuing new Medicaid regulations limiting abortion coverage to the same extent as an earlier rule found unconstitutional by the court. Judge McKee opened his order by calling the new rule "a blatant and ill-concealed attempt to maintain the status quo." Invalidating the prohibition on Medicaid coverage for low-income women's abortions except when two physicians certify that continued pregnancy will result in "grave, long-lasting physical damage," Judge McKee reiterated his holding that such a measure violates the Idaho Constitution. On February 1, Judge McKee held that the state Constitution provides broader protection for the right of privacy than the federal Constitution. The court indicated that the initial Medicaid regulation conflicted with a constitutional guarantee of neutrality, which requires Idaho to be evenhanded when subsidizing the exercise of a constitutionally protected right. Plaintiffs in Roe v. Harris--represented by ACLU Reproductive Freedom Project's Louise Melling, Planned Parenthood Federation's Carole Chervin, and cooperating attorney Newal Squyres--challenged the new regulation in early July. The lawsuit was originally filed in August of 1993. An Idaho statute, which was challenged but upheld, provides Medicaid funding when two physicians certify that it is necessary to save the woman's life or health, or when a court determines the pregnancy resulted from rape or incest. full text

  1. 75 FR 34170 - Chrysler Group LLC, Formally Known as Chrysler LLC, Kenosha Engine Plant, Including On-Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    ... automobile engines. The company reports that workers leased from Caravan Knight Facilities Management, LLC..., Formally Known as Chrysler LLC, Kenosha Engine Plant, Including On-Site Leased Workers From Caravan Knight..., Kenosha Engine Plant, Kenosha, Wisconsin. The notice was published in [[Page 34171

  2. 78 FR 18402 - Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE MKT LLC; Notice of Designation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ...-4 thereunder,\\2\\ proposed rule changes to allow Retail Member Organizations (``RMOs'') to attest...-regulatory organization consents, the Commission shall either approve the proposed rule change, disapprove...-07] Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE MKT LLC; Notice of Designation...

  3. 77 FR 9231 - FFP Missouri 17, LLC; BOST2 Hydroelectric, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    .... 13826-000] FFP Missouri 17, LLC; BOST2 Hydroelectric, LLC; Notice Announcing Preliminary Permit Drawing... of the Commission, or her designee, will conduct a random drawing to determine the filing priority of... applications as provided in section 4.37 of its regulations.\\2\\ The priority established by this drawing will...

  4. 76 FR 68179 - Environmental Management Site-Specific Advisory Board, Idaho National Laboratory

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-03

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Idaho National... November 14, 2011, of the Environmental Management Site-Specific Advisory Board, Idaho National Laboratory...: Robert L. Pence, Federal Coordinator, Department of Energy, Idaho Operations Office, 1955 Fremont Avenue...

  5. Purgeable organic compounds at or near the Idaho Nuclear Technology and Engineering Center, Idaho National Laboratory, Idaho, 2015

    USGS Publications Warehouse

    Maimer, Neil V.; Bartholomay, Roy C.

    2016-05-25

    During 2015, the U.S. Geological Survey, in cooperation with the U.S. Department of Energy, collected groundwater samples from 31 wells at or near the Idaho Nuclear Technology and Engineering Center (INTEC) at the Idaho National Laboratory for purgeable organic compounds (POCs). The samples were collected and analyzed for the purpose of evaluating whether purge water from wells located inside an areal polygon established downgradient of the INTEC must be treated as a Resource Conservation and Recovery Act listed waste.POC concentrations in water samples from 29 of 31 wells completed in the eastern Snake River Plain aquifer were greater than their detection limit, determined from detection and quantitation calculation software, for at least one to four POCs. Of the 29 wells with concentrations greater than their detection limits, only 20 had concentrations greater than the laboratory reporting limit as calculated with detection and quantitation calculation software. None of the concentrations exceeded any maximum contaminant levels established for public drinking water supplies. Most commonly detected compounds were 1,1,1-trichoroethane, 1,1-dichloroethene, and trichloroethene.

  6. Logging utilization in Idaho: Current and past trends

    Treesearch

    Eric A. Simmons; Todd A. Morgan; Erik C. Berg; Stanley J. Zarnoch; Steven W. Hayes; Mike T. Thompson

    2014-01-01

    A study of commercial timber-harvesting activities in Idaho was conducted during 2008 and 2011 to characterize current tree utilization, logging operations, and changes from previous Idaho logging utilization studies. A two-stage simple random sampling design was used to select sites and felled trees for measurement within active logging sites. Thirty-three logging...

  7. 77 FR 38276 - Environmental Management Site-Specific Advisory Board, Idaho National Laboratory

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-27

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Idaho National... a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Idaho National... times prior to the meeting. ADDRESSES: Red Lion Hotel, 1555 Pocatello Creek Road, Pocatello, Idaho 83201...

  8. Battelle Energy Alliance, LLC (BEA) 2016 Self-Assessment Report for Idaho National Laboratory (INL)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Alvarez, Juan

    This report provides Battelle Energy Alliance’s (BEA) self-assessment of performance for the period of October 1, 2015, through September 30, 2016, as evaluated against the goals, performance objectives, and notable outcomes defined in the Fiscal Year (FY) 2016 Performance Evaluation and Measurement Plan (PEMP). BEA took into consideration and consolidated all input provided from internal and external sources (e.g., Contractor Assurance System [CAS], program and customer feedback, external and independent reviews, and Department of Energy [DOE] Idaho Operations Office [ID] quarterly PEMP reports and Quarterly Evaluation Reports). The overall performance of BEA during this rating period was self-assessed as “Excellent,”more » exceeding expectations of performance in Goal 1.0, “Efficient and Effective Mission Accomplishment”; Goal 2.0, “Efficient and Effective Stewardship and Operation of Research Facilities”; and Goal 3.0, “Sound and Competent Leadership and Stewardship of the Laboratory.” BEA met or exceeded expectations for Mission Support Goals 4.0 through 7.0 assessing a final multiplier of 1.0. Table 1 documents BEA’s assessment of performance to the goals and individual performance objectives. Table 2 documents completion of the notable outcomes. A more-detailed assessment of performance for each individual performance objective is documented in the closeout reports (see the PEMP reporting system). Table 3 includes an update to “Performance Challenges” as reported in the FY 2015 Self-Assessment Report.« less

  9. Geothermometric evaluation of geothermal resources in southeastern Idaho

    NASA Astrophysics Data System (ADS)

    Neupane, G.; Mattson, E. D.; McLing, T. L.; Palmer, C. D.; Smith, R. W.; Wood, T. R.; Podgorney, R. K.

    2016-01-01

    Southeastern Idaho exhibits numerous warm springs, warm water from shallow wells, and hot water from oil and gas test wells that indicate a potential for geothermal development in the area. We have estimated reservoir temperatures from chemical composition of thermal waters in southeastern Idaho using an inverse geochemical modeling technique (Reservoir Temperature Estimator, RTEst) that calculates the temperature at which multiple minerals are simultaneously at equilibrium while explicitly accounting for the possible loss of volatile constituents (e.g., CO2), boiling and/or water mixing. The temperature estimates in the region varied from moderately warm (59 °C) to over 175 °C. Specifically, hot springs near Preston, Idaho, resulted in the highest reservoir temperature estimates in the region.

  10. 75 FR 11916 - Chrysler Transportation LLC, a Subsidiary of Chrysler LLC, Including On-Site Leased Workers from...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-12

    ... Chrysler manufacturing facilities, a substantial portion of which are shipped to an affiliated plant where... Caravan Knight Facilities Management LLC were employed on-site at the Detroit, Michigan location of... Knight Facilities Management, LLC, working on-site at the Detroit, Michigan location of Chrysler...

  11. 75 FR 56527 - Environmental Management Site-Specific Advisory Board, Idaho National Laboratory

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-16

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Idaho National... meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Idaho National Laboratory... prior to the meeting. ADDRESSES: Coeur d'Alene Resort, 115 South Second Street, Coeur d'Alene, Idaho...

  12. Idaho's forest products industry and timber harvest, 2011

    Treesearch

    Eric A. Simmons; Steven W. Hayes; Todd A. Morgan; Charles E. Keegan; Chris Witt

    2014-01-01

    This report traces the flow of Idaho’s 2011 timber harvest through the primary industries; provides a description of the structure, capacity, and condition of Idaho’s industry; and quantifies volumes and uses of wood fiber. Historical wood products industry trends are discussed, as well as changes in harvest, production, employment, and sales.

  13. Nez Perce Tribe Welcomes Wolves Back to Idaho.

    ERIC Educational Resources Information Center

    Grossman, Elizabeth

    2002-01-01

    The Nez Perce Tribe is working with the U.S. Fish and Wildlife Service to reintroduce the gray wolf to central Idaho. The tribe does all the fieldwork with the wolves and shares their work with the public at the Wolf Education and Research Center, Winchester, Idaho. Despite opposition from ranchers and legislators, the wolf population is…

  14. North Idaho E. coli Infections Linked to Raw Clover Sprouts > Idaho

    Science.gov Websites

    Stamps Nutrition Education Heating/Telephone Women, Infants and Children Nursing Home Cost Assistance WIC About WIC FAQs Contact Us Apply for WIC Vendor Health Partners Breastfeeding Staff Nutrition Education Livable Communities Idaho Physical Activity and Nutrition (IPAN) Fit and Fall Proof(tm) Nutrition Physical

  15. 76 FR 2713 - Croscill Acquisition, LLC, Currently Known as Croscill Home, LLC, Plant No. 8, Oxford, NC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-14

    ..., Currently Known as Croscill Home, LLC, Plant No. 8, Oxford, NC; Amended Certification Regarding Eligibility..., LLC, formerly doing business as Royal Home Fashions, a subsidiary of Croscill, Inc., Plant No. 8...). The workers are engaged in the supply of warehousing and distribution services of household products...

  16. 75 FR 52982 - Chrysler Group LLC, Formally Known as Chrysler LLC, Kenosha Engine Plant, Including On-Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-30

    ... automobile engines. The company reports that workers leased from Syncreon were employed on-site at the..., Formally Known as Chrysler LLC, Kenosha Engine Plant, Including On-Site Leased Workers From Caravan Knight... Chrysler, LLC, Kenosha Engine Plant, Kenosha, Wisconsin. The notice was published in the Federal Register...

  17. The Status of Physical Activity Opportunities in Idaho Schools

    ERIC Educational Resources Information Center

    Berei, Catherine P.; Karp, Grace Goc; Kauffman, Katie

    2018-01-01

    Recent literature indicates that low percentages of Idaho adolescents report being physically active on a daily basis. Research examines school PA, however, little focuses on Comprehensive School Physical Activity Programs (CSPAPs) from the perspectives of physical educators. This study explored Idaho physical educators' perceptions and…

  18. 76 FR 48883 - Notice of Public Meeting, Idaho Falls District Resource Advisory Council Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-09

    ...] Notice of Public Meeting, Idaho Falls District Resource Advisory Council Meeting AGENCY: Bureau of Land... of the Interior, Bureau of Land Management (BLM) Idaho Falls District Resource Advisory Council (RAC), will meet as indicated below. DATES: The Idaho Falls District RAC will meet in Challis, Idaho...

  19. 78 FR 19522 - Notice of Public Meeting, Idaho Falls District Resource Advisory Council Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-01

    ... Public Meeting, Idaho Falls District Resource Advisory Council Meeting AGENCY: Bureau of Land Management... Interior, Bureau of Land Management (BLM) Idaho Falls District Resource Advisory Council (RAC), will meet as indicated below. DATES: The Idaho Falls District RAC will meet in Challis, Idaho, April 23-24...

  20. 75 FR 27360 - Notice of Public Meeting, Idaho Falls District Resource Advisory Council Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-14

    ... Public Meeting, Idaho Falls District Resource Advisory Council Meeting AGENCY: Bureau of Land Management... Interior, Bureau of Land Management (BLM) Idaho Falls District Resource Advisory Council (RAC), will meet as indicated below. DATES: The Idaho Falls District RAC will meet in Salmon, Idaho on June 22-23...

  1. 78 FR 38071 - Notice of Public Meeting, Idaho Falls District Resource Advisory Council Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-25

    ... Public Meeting, Idaho Falls District Resource Advisory Council Meeting AGENCY: Bureau of Land Management... Interior, Bureau of Land Management (BLM) Idaho Falls District Resource Advisory Council (RAC), will meet as indicated below. DATES: The Idaho Falls District RAC will meet in Pocatello, Idaho, August 27-28...

  2. 78 FR 17716 - Notice of Public Meeting, Idaho Falls District Resource Advisory Council Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-22

    ... Public Meeting, Idaho Falls District Resource Advisory Council Meeting AGENCY: Bureau of Land Management... Interior, Bureau of Land Management (BLM) Idaho Falls District Resource Advisory Council (RAC), will meet as indicated below. DATES: The Idaho Falls District RAC will meet in Challis, Idaho, April 23-24...

  3. Idaho's Library Future.

    ERIC Educational Resources Information Center

    Idaho State Library, Boise.

    In l998, Idahoans gathered in a series of six Regional Futures Conferences to identify what they thought was probable during the next ten years, what was possible for libraries to do and be, and what a preferred future of Idaho libraries might be. Participants from the regional conferences then convened to refine and focus descriptions of the…

  4. Idaho National Laboratory Cultural Resource Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lowrey, Diana Lee

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Officemore » will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  5. Idaho National Laboratory Cultural Resource Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lowrey, Diana Lee

    2009-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Officemore » will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  6. 76 FR 76179 - Notice of Public Meeting, Idaho Falls District Resource Advisory Council Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... Public Meeting, Idaho Falls District Resource Advisory Council Meeting AGENCY: Bureau of Land Management... Interior, Bureau of Land Management (BLM) Idaho Falls District Resource Advisory Council (RAC), will meet as indicated below. DATES: The RAC will next meet in Idaho Falls, Idaho on January 24-25, 2012 for a...

  7. 77 FR 74203 - Notice of Public Meeting, Idaho Falls District Resource Advisory Council Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-13

    ... Public Meeting, Idaho Falls District Resource Advisory Council Meeting AGENCY: Bureau of Land Management... Interior, Bureau of Land Management (BLM) Idaho Falls District Resource Advisory Council (RAC), will meet as indicated below. DATES: The RAC will next meet in Idaho Falls, Idaho on January 22-23, 2013 for a...

  8. 76 FR 3651 - Notice of Public Meeting, Idaho Falls District Resource Advisory Council Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-20

    ...] Notice of Public Meeting, Idaho Falls District Resource Advisory Council Meeting AGENCY: Bureau of Land... of the Interior, Bureau of Land Management (BLM) Idaho Falls District Resource Advisory Council (RAC), will meet as indicated below. DATES: The RAC will next meet in Idaho Falls, Idaho, on February 15-16...

  9. 76 FR 28805 - Notice of Public Meeting, Idaho Falls District Resource Advisory Council Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-18

    ...] Notice of Public Meeting, Idaho Falls District Resource Advisory Council Meeting AGENCY: Bureau of Land... of the Interior, Bureau of Land Management (BLM) Idaho Falls District Resource Advisory Council (RAC), will meet as indicated below. DATES: The Idaho Falls District RAC will meet in Pocatello, Idaho on June...

  10. SELWAY-BITTERROOT WILDERNESS, IDAHO AND MONTANA.

    USGS Publications Warehouse

    Toth, Margo I.; Zilka, Nicholas T.

    1984-01-01

    Mineral-resource studies of the Selway-Bitterroot Wilderness in Idaho County, Idaho, and Missoula and Ravalli Counties, Montana, were carried out. Four areas with probable and one small area of substantiated mineral-resource potential were recognized. The areas of the Running Creek, Painted Rocks, and Whistling Pig plutons of Tertiary age have probable resource potential for molybdenum, although detailed geochemical sampling and surface investigations failed to recognize mineralized systems at the surface. Randomly distributed breccia zones along a fault in the vicinity of the Cliff mine have a substantiated potential for small silver-copper-lead resources.

  11. 78 FR 47807 - Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE MKT LLC; Order Granting an...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-06

    ...-2011-84] Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE MKT LLC; Order Granting an Extension to Limited Exemptions From Rule 612(c) of Regulation NMS In Connection With the Exchanges' Retail... under Rule 612(c) of Regulation NMS (``Sub-Penny Rule'') \\1\\ that granted the New York Stock Exchange...

  12. 75 FR 21352 - Chrysler Group LLC, Formerly Known as Chrysler LLC; Belvidere Assembly Plant: Including On-Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ..., Formerly Known as Chrysler LLC; Belvidere Assembly Plant: Including On-Site Leased Workers From Aerotek, G..., formerly known as Chrysler LLC, Belvidere Assembly Plant, include on- site leased workers from Aerotek and... certification for workers of the subject firm. The workers are engaged in activities related to the assembly the...

  13. 77 FR 10740 - Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC, Riverbank Hydro No...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14261-000, 14268-000, 14277-000, 14281-000] Lock+ Hydro Friends Fund XVIII, Upper Hydroelectric, LLC, FFP Project 95, LLC...-Tombigbee Waterway in Lowndes County, Mississippi. The applications were filed by Lock+ Hydro Friends Fund...

  14. 76 FR 28306 - Amendment of Class D and Class E Airspace; Idaho Falls, ID

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-17

    ...-0023; Airspace Docket No. 11-ANM-2] Amendment of Class D and Class E Airspace; Idaho Falls, ID AGENCY... D and Class E airspace at Idaho Falls, ID, by changing the name of the airport to Idaho Falls... Performance (RNP) standard instrument approach procedures at Idaho Falls Regional Airport. This improves the...

  15. Cost-Effectiveness Analysis of the Residential Provisions of the 2015 IECC for Idaho

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mendon, Vrushali V.; Zhao, Mingjie; Taylor, Zachary T.

    The 2015 IECC provides cost-effective savings for residential buildings in Idaho. Moving to the 2015 IECC from the 2015 Idaho State Code base code is cost-effective for residential buildings in all climate zones in Idaho.

  16. 77 FR 29730 - Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE Amex LLC; Notice of Designation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-66981; SR-NYSE-2011-56; SR-NYSEAmex-2011-86] Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE Amex LLC; Notice of Designation of Longer Period for Commission Action on Proceedings To Determine Whether to Disapprove Proposed Rule Changes To Codify Certain Traditional Trading Floor...

  17. 76 FR 29279 - Calvert Cliffs 3 Nuclear Project, LLC and Unistar Nuclear Operating Services, LLC; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-20

    ... NUCLEAR REGULATORY COMMISSION [DOCKET NO. 52-016; NRC-2008-0250] Calvert Cliffs 3 Nuclear Project, LLC and Unistar Nuclear Operating Services, LLC; Notice of Availability of the Final Environmental Impact Statement for the Combined License Application for Calvert Cliffs Nuclear Power Plant Unit 3 Notice is hereby given that the U.S. Nuclear...

  18. 76 FR 40945 - Entergy Nuclear Indian Point 2, LLC, Entergy Nuclear Indian Point 3, LLC, Entergy Nuclear...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-12

    ... NUCLEAR REGULATORY COMMISSION [NRC-2011-0150; Docket Nos. 50-003, 50-247, and 50-286; License Nos. DPR-5, DPR-26, and DPR-64] Entergy Nuclear Indian Point 2, LLC, Entergy Nuclear Indian Point 3, LLC, Entergy Nuclear Operations, Inc.; Receipt of Request for Action Notice is hereby given that by petition...

  19. 76 FR 68523 - Utah Southern Railroad Company, LLC-Change in Operators Exemption-Iron Bull Railroad Company, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-04

    ... Railroad Company, LLC--Change in Operators Exemption--Iron Bull Railroad Company, LLC Utah Southern... to change operators from Iron Bull Railroad Company (IBRC) to USRC on a rail line known as the... an operating agreement with PIC. This change in operators is exempt under 49 CFR 1150.31(a)(3).\\1\\ \\1...

  20. 75 FR 61463 - The Narragansett Electric Company; Arcadia Gas Storage, LLC; Salt Plains Storage, LLC; Jefferson...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR10-114-000; Docket No. PR10-117-000; Docket No. PR10-118- 000; Docket No. PR10-119-000; Docket No. PR10-120-000; Docket No. PR10- 121-000; Docket No. PR10-122-000 (Not Consolidated)] The Narragansett Electric Company; Arcadia Gas Storage, LLC; Salt Plains Storage, LLC;...

  1. 128. COTTONWOOD CUT, TWIN FALLS COUNTY, SOUTH OF KIMBERLY, IDAHO; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    128. COTTONWOOD CUT, TWIN FALLS COUNTY, SOUTH OF KIMBERLY, IDAHO; NORTH VIEW. - Milner Dam & Main Canal: Twin Falls Canal Company, On Snake River, 11 miles West of city of Burley, Idaho, Twin Falls, Twin Falls County, ID

  2. 77 FR 41806 - RG Steel Sparrows Point LLC, Formerly Known as Severstal Sparrows Point LLC, a Subsidiary of RG...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-16

    ... Leased Workers From Echelon Service Company, Sun Associated Industries, INC., MPI Consultants LLC... International, including on-site leased workers from Echelon Service Company, Sun Associated Industries, Inc... Company, Sun Associated Industries, Inc., MPI Consultants LLC, Alliance Engineering, Inc., Washington...

  3. 77 FR 10740 - Lock+ Hydro Friends Fund VIII, FFP Project 92, LLC, Riverbank Hydro No. 24, LLC; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14262-000, 14276-000, 14280-000] Lock+ Hydro Friends Fund VIII, FFP Project 92, LLC, Riverbank Hydro No. 24, LLC; Notice... Counties, Kentucky. The applications were filed by Lock+ Hydro Friends Fund VIII for Project No. 14262-000...

  4. 78 FR 28584 - Sunshine Act Meeting Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-15

    ... Reference Room. 994th--Meeting Regular Meeting May 16, 2013 10 a.m. Item No. Docket No. Company... General Electric Company. ER13-127-000 Idaho Power Company. E-3 OMITTED E-4 OA12-1-000 SU FERC, L.L.C. E-5.... Ameren Illinois Company. Ameren Transmission Company of Illinois. American Transmission Company, LLC. Big...

  5. 76 FR 82011 - Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE Amex LLC; Notice of Designation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    ... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-66036; File Nos. SR-NYSE-2011-56; SR-NYSEAmex-2011-86] Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE Amex LLC; Notice of Designation of a Longer Period for Commission Action on Proposed Rule Changes To Codify Certain Traditional Trading Floor Functions That May Be Performed by...

  6. 78 FR 29406 - Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE MKT LLC; Notice of Designation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-20

    ... SECURITIES AND EXCHANGE COMMISSION [Release No. 34-69575; File Nos. SR-NYSE-2012-57; SR-NYSEMKT-2012-58] Self-Regulatory Organizations; New York Stock Exchange LLC; NYSE MKT LLC; Notice of Designation of Longer Period for Commission Action on Proceedings To Determine Whether To Disapprove Proposed Rule Changes Deleting NYSE Rules 95(c) and (d)...

  7. DOJ News Release: Boise Couple Sentenced for Defrauding Idaho DEQ

    EPA Pesticide Factsheets

    Jorge Garcia and Karen Damberg Garcia were sentenced today for conspiring to defraud the Idaho Department of Environmental Quality of federal grant funds that were to be used to install diesel emission reduction equipment on Idaho school buses.

  8. The Petroglyphs at Lake Pend Oreille, Bonner County, Northern Idaho.

    DTIC Science & Technology

    1985-12-01

    LAKE PEND OREILLE BONNER COUNTY, NORTHERN IDAHO 00 00 DTIC rCbELECTE DEC 2 8 1987 US Army Corps 87 12 140 of Engineers 1 Seattle District .t bdaaP O... IDAHO 6. PERFORMING ORG. REPORT NUMBERrNs * 1 7. AUTHOR(e) 8. CONTRACT OR GRANT NUMBER(s) K. Boreson and W.R. Peterson DACW67-85-M-0025 9. PERFORMING...CLASSIFICATION OF THIS PAkGE(Won Data Fntered) % .4 %. %~~ % I lr- rv-tTVK tm V THE PETROGLYPHS AT LAKE PEND OREILLE, BONNER COUNTY, NORTHERN IDAHO By

  9. 107. MURTAUGH LAKE, TWIN FALLS COUNTY, SOUTH OF MURTAUGH, IDAHO; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    107. MURTAUGH LAKE, TWIN FALLS COUNTY, SOUTH OF MURTAUGH, IDAHO; WEST VIEW OF LAKE. - Milner Dam & Main Canal: Twin Falls Canal Company, On Snake River, 11 miles West of city of Burley, Idaho, Twin Falls, Twin Falls County, ID

  10. 77 FR 20019 - FirstEnergy Solutions Corp., Allegheny Energy Supply Company, LLC v. PJM Interconnection, L.L.C...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-03

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL12-50-000] FirstEnergy Solutions Corp., Allegheny Energy Supply Company, LLC v. PJM Interconnection, L.L.C.; Notice of Complaint... 206 of the Federal Energy Regulatory Commission's Rules of Practice and Procedure, 18 CFR 385.206 and...

  11. 75 FR 20591 - AES Sparrows Point LNG, LLC and Mid-Atlantic Express, LLC; Notice of Final General Conformity...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-20

    ... quality impacts associated with the construction and operation of a liquefied natural gas (LNG) import terminal and natural gas pipeline proposed by AES Sparrows Point LNG, LLC and Mid-Atlantic Express, LLC, in... of the following LNG terminal and natural gas pipeline facilities: A ship unloading facility, with...

  12. 78 FR 46938 - St. Paul Park Refining Co. LLC v. Enbridge Pipelines (North Dakota) LLC; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. OR13-28-000] St. Paul Park..., 2013, St. Paul Park Refining Co. LLC (Complainant) filed a formal complaint against Enbridge Pipelines... regulatory basis. St. Paul Park Refining Co. LLC certifies that copies of the complaint were served on the...

  13. 75 FR 77670 - SuperMedia, LLC, Formerly Known as Idearc Media, LLC, a Subsidiary of SuperMedia Information...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-13

    ... Known as Idearc Media, LLC, a Subsidiary of SuperMedia Information Services, LLC Publishing Group, Troy... for Reconsideration. The Notice was published in the Federal Register on October 25, 2010 (75 FR 65515... directly competitive with those provided by the Publishing Group. Conclusion After careful review of the...

  14. 77 FR 13317 - Riverbank Hydro No. 2, LLC, Lock+ Hydro Friends Fund XXXVI, Qualified Hydro 21, LLC; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14130-000, 14137-000, 14134-000] Riverbank Hydro No. 2, LLC, Lock+ Hydro Friends Fund XXXVI, Qualified Hydro 21, LLC; Notice... drawing, the order of priority is as follows: 1. Lock+ Hydro Friends Fund XXXVI: Project No. 14137-000. 2...

  15. 77 FR 12280 - Riverbank Hydro No. 1, LLC, Lock+ Hydro Friends Fund XXXVII; Qualified Hydro 20, LLC; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14131-000, 14138-00, 14135-000] Riverbank Hydro No. 1, LLC, Lock+ Hydro Friends Fund XXXVII; Qualified Hydro 20, LLC; Notice..., the order of priority is as follows: 1. Lock+ Hydro Friends Fund XXXVII, Project No. 14138-000. 2...

  16. 77 FR 9230 - Riverbank Hydro No. 1, LLC; Lock+ Hydro Friends Fund XXXVII; Qualified Hydro 20, LLC; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14131-000; Project No. 14138-000; Project No. 14135-000] Riverbank Hydro No. 1, LLC; Lock+ Hydro Friends Fund XXXVII; Qualified... Hydro No. 1, LLC for Project No. 14131-000, Lock+ Hydro Friends Fund XXXVII for Project No. 14138- 000...

  17. Better Together: Coeur d'Alene Reservation Communities and the University of Idaho

    ERIC Educational Resources Information Center

    Salant, Priscilla; Laumatia, Laura

    2011-01-01

    The Coeur d'Alene Reservation spans 345,000 acres of mountains and farmland in northern Idaho. Most people on the reservation live in the communities of Worley, Plummer, Tensed, and Desmet. Roughly 50 miles south of Plummer is the University of Idaho's main campus in Moscow. The university is Idaho's land-grant institution, with a statewide…

  18. 78 FR 54487 - YP Western Directory LLC, San Francisco Division, Publishing Operations Group, YP Subsidiary...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-04

    ... Directory LLC, San Francisco Division, Publishing Operations Group, YP Subsidiary Holdings LLC, YP LLC, YP... Directory LLC, San Francisco Division, Publishing Operations Group, YP Subsidiary Holdings LLC, YP LLC, YP... workers of YP Western Directory LLC, San Francisco Division, Publishing Operations Group, YP Subsidiary...

  19. 78 FR 21494 - Union Pacific Railroad Company-Abandonment Exemption-in Washington County, Idaho

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-10

    ... Pacific Railroad Company--Abandonment Exemption--in Washington County, Idaho Union Pacific Railroad... at Weiser, in Washington County, Idaho. The line traverses United States Postal Service Zip Code... Bingham & Bonneville Counties, Idaho, 360 I.C.C. 91 (1979). To address whether this condition adequately...

  20. 76 FR 76153 - Notice of Effectiveness of Exempt Wholesale Generator Status; Caney River Wind Project, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ...] Notice of Effectiveness of Exempt Wholesale Generator Status; Caney River Wind Project, LLC, Mesquite Solar 1, LLC, Copper Crossing Solar LLC, Copper Mountain Solar 1, LLC, Pinnacle Wind, LLC, Bellevue Solar, LLC, Yamhill Solar, LLC, Osage Wind, LLC, Minco Wind II, LLC Take notice that during the month of...

  1. 105. MURTAUGH LAKE, TWIN FALLS COUNTY, SOUTH OF MURTAUGH, IDAHO; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    105. MURTAUGH LAKE, TWIN FALLS COUNTY, SOUTH OF MURTAUGH, IDAHO; NORTHWEST VIEW OF LAKE AND HEADGATES. - Milner Dam & Main Canal: Twin Falls Canal Company, On Snake River, 11 miles West of city of Burley, Idaho, Twin Falls, Twin Falls County, ID

  2. Substance Use, Safety and School Climate in Idaho, 1998.

    ERIC Educational Resources Information Center

    Coe, Michael T.

    This report details the results of the 1998 Idaho Substance Use and School Climate Survey, conducted by the Northwest Regional Educational Laboratory for the Idaho Department of Education. Sixth, eighth, tenth, and twelfth grade students were asked about the use of alcohol, tobacco, and illegal drugs, as well as about their perceptions of the…

  3. 76 FR 25378 - Exelon Generation Company, LLC; PSEG Nuclear, LLC; Peach Bottom Atomic Power Station, Units 2 and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-04

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-277 and 50-278; NRC-2011-0101] Exelon Generation Company, LLC; PSEG Nuclear, LLC; Peach Bottom Atomic Power Station, Units 2 and 3; Notice of Withdrawal of... for the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, located in York and Lancaster...

  4. Third strike for Idaho reactor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crawford, M.

    Differing opinions concerning the modification of the Power Burst Facility (PBF) at Idaho Falls to turn the facility into a research and cancer treatment center are reported. Energy Secretary James Watkins convened an independent panel to examine once again the merits of converting the PBF, and the committee concluded that there is neither enough information currently available sufficiently encouraging to convert the PBF or to maintain it for this purpose. Idaho legislators have used their influence to include $13 million in the Department of Energy 1991 budget for design studies, limited reactor modifications, and maintenance. After the report of themore » committee, Secretary Watkins must decide to either ask congress to rescind the $13 million appropriated for 1991 or spend money to close down the reactor in 1992.« less

  5. Rural Idaho family physicians' scope of practice.

    PubMed

    Baker, Ed; Schmitz, David; Epperly, Ted; Nukui, Ayaka; Miller, Carissa Moffat

    2010-01-01

    Scope of practice is an important factor in both training and recruiting rural family physicians. To assess rural Idaho family physicians' scope of practice and to examine variations in scope of practice across variables such as gender, age and employment status. A survey instrument was developed based on a literature review and was validated by physician educators, practicing family physicians and executives at the state hospital association. This survey was mailed to rural family physicians practicing in Idaho counties with populations of less than 50,000. Descriptive, bivariate and multivariate analyses were employed to describe and compare scope of practice patterns. Responses were obtained from 92 of 248 physicians (37.1% response rate). Idaho rural family physicians reported providing obstetrical services in the areas of prenatal care (57.6%), vaginal delivery (52.2%) and C-sections (37.0%); other operating room services (43.5%); esophagogastroduodenoscopy (EGD) or colonoscopy services (22.5%); emergency room coverage (48.9%); inpatient admissions (88.9%); mental health services (90.1%); nursing home services (88.0%); and supervision to midlevel care providers (72.5%). Bivariate analyses showed differences in scope of practice patterns across gender, age group and employment status. Binomial logistic regression models indicated that younger physicians were roughly 3 times more likely to provide prenatal care and perform vaginal deliveries than older physicians in rural areas. Idaho practicing rural family physicians report a broad scope of practice. Younger, employed and female rural family medicine physicians are important subgroups for further study.

  6. 1. NORTH IDAHO PHOSPHATE COMPANY PLANTS. VIEW IS TO THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. NORTH IDAHO PHOSPHATE COMPANY PLANTS. VIEW IS TO THE NORTHEAST, WITH THE SHIPPING AND STORAGE WAREHOUSE, AMMONIUM PHOSPHATE FERTILIZER PLANT, AND PHOSPHORIC ACID PLANT APPEARING IN SUCCESSION DOWN GOVERNMENT GULCH. - North Idaho Phosphate Company, Silver King Community, Kellogg, Shoshone County, ID

  7. Assessment of the Geothermal System Near Stanley, Idaho

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Trent Armstrong; John Welhan; Mike McCurry

    2012-06-01

    The City of Stanley, Idaho (population 63) is situated in the Salmon River valley of the central Idaho highlands. Due to its location and elevation (6270 feet amsl) it is one of the coldest locales in the continental U.S., on average experiencing frost 290 days of the year as well as 60 days of below zero (oF) temperatures. Because of high snowfall (76 inches on average) and the fact that it is at the terminus of its rural grid, the city also frequently endures extended power outages during the winter. To evaluate its options for reducing heating costs and possiblemore » local power generation, the city obtained a rural development grant from the USDA and commissioned a feasibility study through author Roy Mink to determine whether a comprehensive site characterization and/or test drilling program was warranted. Geoscience students and faculty at Idaho State University (ISU), together with scientists from the Idaho Geological Survey (IGS) and Idaho National Laboratory (INL) conducted three field data collection campaigns between June, 2011 and November, 2012 with the assistance of author Beckwith who arranged for food, lodging and local property access throughout the field campaigns. Some of the information collected by ISU and the IGS were compiled by author Mink and Boise State University in a series of progress reports (Makovsky et al., 2011a, b, c, d). This communication summarizes all of the data collected by ISU including data that were compiled as part of the IGS’s effort for the National Geothermal Data System’s (NGDS) data compilation project funded by the Department of Energy and coordinated by the Arizona Geological Survey.« less

  8. Reconnaissance geologic map of the Selway-Bitterroot Wilderness, Idaho County, Idaho, and Missoula and Ravalli counties, Montana

    USGS Publications Warehouse

    Toth, Margo I.

    1983-01-01

    The Selway-Bitterroot Wilderness covers about 1.25 million acres in east-central Idaho and western Montana (fig. 1). The wilderness lies across the Bitterroot Range, which forms the boundary between Idaho and Montana, and includes large portions of the drainages of the Selway, Lochsa, and Bitterroot Rivers. Elevations range from 1,800 ft on the Selway River near the wilderness boundary to 10,157 ft at Trapper Peak in the Bitterroot Mountains. Cities within 50 min of the wilderness include Missoula, Hamilton, and Salmon on the east, and Orofino and Grangeville on the west. Access to trailheads near the edge of the wilderness is limited to dirt roads. 

  9. 77 FR 8248 - Bluewater Gas Storage, LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12-51-000] Bluewater Gas Storage, LLC; Notice of Application Take notice that on January 27, 2012, Bluewater Gas Storage, LLC... Wilson Kisluk, Senior Attorney, Bluewater Gas Storage, LLC, 333 Clay Street, Suite 1500, Houston, Texas...

  10. 76 FR 76684 - Idaho: Tentative Approval of State Underground Storage Tank Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-08

    .... Skyline, Suite B, Idaho Falls, ID 83402 from 10 a.m. to 12 p.m. and 1 p.m. to 4 p.m.; and 6. IDEQ Lewiston... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 281 [EPA-R10-UST-2011-0896; FRL-9502-6] Idaho...). ACTION: Proposed rule. SUMMARY: The State of Idaho has applied for final approval of its Underground...

  11. 40 CFR 81.100 - Eastern Washington-Northern Idaho Interstate Air Quality Control Region.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 17 2010-07-01 2010-07-01 false Eastern Washington-Northern Idaho... Designation of Air Quality Control Regions § 81.100 Eastern Washington-Northern Idaho Interstate Air Quality Control Region. The Eastern Washington-Northern Idaho Interstate Air Quality Control Region consists of...

  12. 75 FR 6071 - Exelon Generation Company, LLC; PSEG Nuclear, LLC; Peach Bottom Atomic Power Station Units 2 and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-05

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-277 and 50-278; NRC-2010-0042] Exelon Generation Company, LLC; PSEG Nuclear, LLC; Peach Bottom Atomic Power Station Units 2 and 3; Notice of Withdrawal of... and DPR-56 for the Peach Bottom Atomic Power Station (PBAPS), Units 2 and 3, located in York and...

  13. 78 FR 48668 - PSEG Long Island LLC, Long Island Electric Utility Servco LLC, Long Island Power Authority, Long...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Docket No. EL13-81-000] PSEG Long Island LLC, Long Island Electric Utility Servco LLC, Long Island Power Authority, Long Island Lighting Company; Notice of Petition for Declaratory Order Take notice that on August 1, 2013, pursuant to Rule 207 of the Federal Energy Regulatory...

  14. IDAHO TEACHER MOBILITY--1965.

    ERIC Educational Resources Information Center

    ORLICH, DONALD C.; AND OTHERS

    WITH IMPROVED CLASSROOM TEACHING AS A MAJOR GOAL, RESPONSES FROM 717 TEACHERS (72.7 PERCENT OF THE 929 SURVEYED) WERE ANALYZED TO DETERMINE CAUSES OF IDAHO'S RELATIVELY HIGH RATE OF PUBLIC SCHOOL TEACHER MOBILITY AND TO RECOMMEND MEASURES PROMOTING TEACHER RETENTION. BASED UPON SIX CONTRIBUTING FACTORS--ADMINISTRATIVE, COMMUNITY, ECONOMIC,…

  15. 76 FR 30341 - Reliable Storage 1 LLC;

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-25

    ... DEPARTMENT OF ENERGY [Project No. 14152-000] Reliable Storage 1 LLC; Notice of Preliminary Permit... March 25, 2011, Reliable Storage 1 LLC filed an application, pursuant to section 4(f) of the Federal... waters owned by others without the owners' express permission. The proposed pumped storage project would...

  16. The Implementation of Pay for Performance in Idaho Schools: A Case Study of Teacher Perceptions

    ERIC Educational Resources Information Center

    Staniec, Shelly Ann

    2013-01-01

    This is a qualitative narrative case study set in an Idaho high school where twelve educators offered their viewpoints on the implementation of Idaho's pay-for-performance legislation. In the spring of 2011, Idaho legislators passed laws aimed at increasing student performance and college or career readiness. These laws, known as Idaho's Students…

  17. Idaho Youth Report 1996. An Evaluation of Idaho's Byrne Funded Youth Programs.

    ERIC Educational Resources Information Center

    Uhlenkott, Robert C.

    Drug abuse and crime rates in the United States have surged to alarming levels in the 1990s and could increase to epidemic proportions if not addressed appropriately. The identification and evaluation of the programs that Idaho utilizes in fighting crime and reducing drug use are covered in this booklet. The report focuses on two different…

  18. 77 FR 41454 - Entergy Nuclear Indian Point Unit 2, LLC, Entergy Nuclear Indian Point Unit 3, LLC, Entergy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-13

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-247 and 50-286; NRC-2012-0168] Entergy Nuclear Indian Point Unit 2, LLC, Entergy Nuclear Indian Point Unit 3, LLC, Entergy Nuclear Operations, Inc., Indian Point Nuclear Generating Units 2 and 3; Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear Regulatory Commission (NRC...

  19. 76 FR 7230 - Notice of Public Meeting, Boise District Resource Advisory Council, Idaho

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-09

    ... 4500019829] Notice of Public Meeting, Boise District Resource Advisory Council, Idaho AGENCY: Bureau of Land... Office, located at 3948 S. Development Avenue, Boise, Idaho, beginning at 9 a.m. and adjourning at 4:30 p... management issues associated with public land management in southwestern Idaho. Items on the agenda include...

  20. 76 FR 4892 - Lock+ Hydro Friends Fund XXXIX, FFP Missouri 3, LLC, Allegheny 3 Hydro, LLC, Three Rivers Hydro...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 13740-000, 13749-000, 13775-000, 13781-000] Lock+ Hydro Friends Fund XXXIX, FFP Missouri 3, LLC, Allegheny 3 Hydro, LLC, Three..., Pennsylvania.\\1\\ The applications were filed by Lock+ Hydro Friends Fund XXXIX, for Project No. 13740-000, FFP...

  1. Compilation and analysis of multiple groundwater-quality datasets for Idaho

    USGS Publications Warehouse

    Hundt, Stephen A.; Hopkins, Candice B.

    2018-05-09

    Groundwater is an important source of drinking and irrigation water throughout Idaho, and groundwater quality is monitored by various Federal, State, and local agencies. The historical, multi-agency records of groundwater quality include a valuable dataset that has yet to be compiled or analyzed on a statewide level. The purpose of this study is to combine groundwater-quality data from multiple sources into a single database, to summarize this dataset, and to perform bulk analyses to reveal spatial and temporal patterns of water quality throughout Idaho. Data were retrieved from the Water Quality Portal (https://www.waterqualitydata.us/), the Idaho Department of Environmental Quality, and the Idaho Department of Water Resources. Analyses included counting the number of times a sample location had concentrations above Maximum Contaminant Levels (MCL), performing trends tests, and calculating correlations between water-quality analytes. The water-quality database and the analysis results are available through USGS ScienceBase (https://doi.org/10.5066/F72V2FBG).

  2. Residential Energy Efficiency Potential: Idaho

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, Eric J

    Energy used by Idaho single-family homes that can be saved through cost-effective improvements. Prepared by Eric Wilson and Noel Merket, NREL, and Erin Boyd, U.S. Department of Energy Office of Energy Policy and Systems Analysis.

  3. The trend of forest fire research in northern Idaho

    Treesearch

    H. T. Gisborne

    1926-01-01

    Readers or the Idaho Forester do not need to be told why it is necessary to study forest fires in Northern Idaho. They have seen the fires sweep though virgin stands or merchantable timber and through beautiful young stands of valuable reproduction, greatly reducing the value of the merchantable timber and trees and often completely destroying the young stands which...

  4. Inactivation of LLC1 gene in nonsmall cell lung cancer

    PubMed Central

    Hong, Kyeong-Man; Yang, Sei-Hoon; Chowdhuri, Sinchita R.; Player, Audrey; Hames, Megan; Fukuoka, Junya; Meerzaman, Daoud; Dracheva, Tatiana; Sun, Zhifu; Yang, Ping; Jen, Jin

    2007-01-01

    Serial analysis of gene expression studies led us to identify a previously unknown gene, c20orf85, that is present in the normal lung epithelium, but absent or downregulated in most primary non-small cell lung cancers and lung cancer cell lines. We named this gene LLC1 for Low in Lung Cancer 1. LLC1 is located on chromosome 20q13.3 and has a 70% GC content in the promoter region. It has 4 exons and encodes a protein containing 137 amino acids. By in situ hybridization, we observed that LLC1 message is localized in normal lung bronchial epithelial cells, but absent in 13 of 14 lung adenocarcinoma and 9 out of 10 lung squamous carcinoma samples. Methylation at CpG sites of the LLC1 promoter was frequently observed in lung cancer cell lines and in a fraction of primary lung cancer tissues. Treatment with 5-aza deoxycytidine resulted in a reduced methylation of the LLC1 promoter concomitant with the increase of LLC1 expression. These results suggest that inactivation of LLC1 by means of promoter methylation is a frequent event in nonsmall cell lung cancer and may play a role in lung tumorigenesis. PMID:17304513

  5. 77 FR 2972 - Thunder Bay Power Company, Thunder Bay Power, LLC, et al.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ... Hydro, LLC. Dayton Fox River, LaSalle County, IL. P-2347-049 Midwest Hydro, Inc. Midwest Hydro, LLC... FR, Neenah Paper FR, Middle Appleton Dam Lower Fox River, LLC and N.E.W. LLC and N.E.W. Outagamie...

  6. 36 CFR 294.25 - Mineral activities in Idaho Roadless Areas.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Minerals and Energy in the Roadless Area Conservation; National Forest System Lands in Idaho Final... 36 Parks, Forests, and Public Property 2 2013-07-01 2013-07-01 false Mineral activities in Idaho Roadless Areas. 294.25 Section 294.25 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF...

  7. 36 CFR 294.25 - Mineral activities in Idaho Roadless Areas.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Minerals and Energy in the Roadless Area Conservation; National Forest System Lands in Idaho Final... 36 Parks, Forests, and Public Property 2 2011-07-01 2011-07-01 false Mineral activities in Idaho Roadless Areas. 294.25 Section 294.25 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF...

  8. 36 CFR 294.25 - Mineral activities in Idaho Roadless Areas.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Minerals and Energy in the Roadless Area Conservation; National Forest System Lands in Idaho Final... 36 Parks, Forests, and Public Property 2 2014-07-01 2014-07-01 false Mineral activities in Idaho Roadless Areas. 294.25 Section 294.25 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF...

  9. 36 CFR 294.25 - Mineral activities in Idaho Roadless Areas.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Minerals and Energy in the Roadless Area Conservation; National Forest System Lands in Idaho Final... 36 Parks, Forests, and Public Property 2 2012-07-01 2012-07-01 false Mineral activities in Idaho Roadless Areas. 294.25 Section 294.25 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF...

  10. 122. MCMULLEN CREEK, TWIN FALLS COUNTY, SOUTH OF KIMBERLY, IDAHO; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    122. MCMULLEN CREEK, TWIN FALLS COUNTY, SOUTH OF KIMBERLY, IDAHO; INLET SIDE OF THE CREEK, ENTRANCE INTO THE HIGH LINE CANAL, SOUTH VIEW. - Milner Dam & Main Canal: Twin Falls Canal Company, On Snake River, 11 miles West of city of Burley, Idaho, Twin Falls, Twin Falls County, ID

  11. 78 FR 77618 - Airworthiness Directives; M7 Aerospace LLC Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-24

    ...-1057; Directorate Identifier 2013-CE-041-AD] RIN 2120-AA64 Airworthiness Directives; M7 Aerospace LLC...). SUMMARY: We propose to adopt a new airworthiness directive (AD) for all M7 Aerospace LLC Models SA226-AT... bulkhead. This proposed AD also requires reporting certain inspection results to M7 Aerospace LLC. We are...

  12. 40 CFR 272.651 - Idaho State-Administered Program: Final Authorization.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Idaho § 272.651 Idaho... hazardous waste management program. However, the EPA retains the authority to exercise its inspection and... incorporated by reference as part of the hazardous waste management program under subtitle C of RCRA, 42 U.S.C...

  13. 40 CFR 272.651 - Idaho State-Administered Program: Final Authorization.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) SOLID WASTES (CONTINUED) APPROVED STATE HAZARDOUS WASTE MANAGEMENT PROGRAMS Idaho § 272.651 Idaho... hazardous waste management program. However, the EPA retains the authority to exercise its inspection and... incorporated by reference as part of the hazardous waste management program under subtitle C of RCRA, 42 U.S.C...

  14. Echinococcus granulosus in gray wolves and ungulates in Idaho and Montana, USA.

    PubMed

    Foreyt, William J; Drew, Mark L; Atkinson, Mark; McCauley, Deborah

    2009-10-01

    We evaluated the small intestines of 123 gray wolves (Canis lupus) that were collected from Idaho, USA (n=63), and Montana, USA (n=60), between 2006 and 2008 for the tapeworm Echinococcus granulosus. The tapeworm was detected in 39 of 63 wolves (62%) in Idaho, USA, and 38 of 60 wolves (63%) in Montana, USA. The detection of thousands of tapeworms per wolf was a common finding. In Idaho, USA, hydatid cysts, the intermediate form of E. granulosus, were detected in elk (Cervus elaphus), mule deer (Odocoileus hemionus), and a mountain goat (Oreamnos americanus). In Montana, USA, hydatid cysts were detected in elk. To our knowledge, this is the first report of adult E. granulosus in Idaho, USA, or Montana, USA. It is unknown whether the parasite was introduced into Idaho, USA, and southwestern Montana, USA, with the importation of wolves from Alberta, Canada, or British Columbia, Canada, into Yellowstone National Park, Wyoming, USA, and central Idaho, USA, in 1995 and 1996, or whether the parasite has always been present in other carnivore hosts, and wolves became a new definitive host. Based on our results, the parasite is now well established in wolves in these states and is documented in elk, mule deer, and a mountain goat as intermediate hosts.

  15. 76 FR 73616 - Lock Hydro Friends Fund VIII, FFP Project 92 LLC, Riverbank Hydro No. 24 LLC; Notice of Competing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14262-000; 14276-000; 14280-000] Lock Hydro Friends Fund VIII, FFP Project 92 LLC, Riverbank Hydro No. 24 LLC; Notice of..., and Competing Applications On September 1, 2011, Lock Hydro Friends Fund VIII (Lock Hydro), FFP...

  16. 76 FR 14652 - Port Barre Investments, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-17

    ... Investments, L.L.C.; Notice of Application Take notice that on March 4, 2011, Port Barre Investments, L.L.C. (Bobcat) filed in Docket No. CP11-124-000 an application pursuant to section 7(c) of the Natural Gas Act... Investments, L.L.C., 126 FERC ] 61,240 (2009). \\2\\ Port Barre Investments, L.L.C., 130 FERC ] 62,272 (2010...

  17. Mineralogy of selected sedimentary interbeds at or near the Idaho National Engineering Laboratory, Idaho

    USGS Publications Warehouse

    Reed, Michael F.; Bartholomay, Roy C.

    1994-01-01

    The U.S. Geological Survey (USGS) Project Office at the Idaho National Engineering Laboratory (INEL), in cooperation with the U.S. Department of Energy and Idaho State University, analyzed 66 samples from sedimentary interbed cores during a 38-month period beginning in October 1990 to determine bulk and clay mineralogy. These cores had been collected from 19 sites in the Big Lost River Basin, 2 sites in the Birch Creek Basin, and 1 site in the Mud Lake Basin, and were archived at the USGS lithologic core library at the INEL. Mineralogy data indicate that the core samples from the Big Lost River Basin have larger mean and median percentages of quartz, total feldspar, and total clay minerals, but smaller mean and median percentages of calcite than the core samples from the Birch Creek Basin. Core samples from the Mud Lake Basin have abundant quartz, total feldspar, calcite, and total clay minerals.

  18. 77 FR 74245 - ING Investments, LLC, et al.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-13

    ... Investments, LLC (``IIL''), Directed Services LLC (``DSL'') and ING Investment Management Co. LLC (``IIM..., at (202) 551-6821 (Division of Investment Management, Office of Investment Company Regulation..., N.V. 2. Each Registrant is registered under the Act as an open-end management investment company...

  19. Insects of the Idaho National Laboratory: A compilation and review

    Treesearch

    Nancy Hampton

    2005-01-01

    Large tracts of important sagebrush (Artemisia L.) habitat in southeastern Idaho, including thousands of acres at the Idaho National Laboratory (INL), continue to be lost and degraded through wildland fire and other disturbances. The roles of most insects in sagebrush ecosystems are not well understood, and the effects of habitat loss and alteration...

  20. An Analysis of the Charter School Facility Landscape in Idaho

    ERIC Educational Resources Information Center

    National Alliance for Public Charter Schools, 2012

    2012-01-01

    In spring of 2012, the Idaho Charter School Network, the Colorado League of Charter Schools, and the National Alliance for Public Charter Schools worked to collect evidence that would accurately portray both the adequacy of charter school facilities and the average spending for facilities out of charter schools' operating budgets in Idaho.…

  1. 77 FR 70159 - Marble River, LLC v. Noble Clinton Windpark I, LLC, Noble Ellenburg Windpark, LLC, Noble...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL13-20-000] Marble River... Commission's (Commission) Rules of Practice and Procedure, Marble River, LLC (Marble River or Complainant.... (NYISO or Respondent), alleging that Noble failed to pay Marble River for headroom created by common...

  2. Farming and ranching related injuries in Southern Idaho.

    PubMed

    Shaver, Jackson; McRoberts, Drew; O'Byrne, Brian; Morgan, Bill; Krall, Kevin; Surjan, Christian; Mayberry, John

    2017-05-01

    Agriculture is an inherently dangerous industry. We sought injury data for use with the Idaho Time Sensitive Emergency (TSE) system to formulate goals and track improvements. Registries in southern Idaho were queried for ICD-9-CM diagnoses related to agriculture in 2014. Injuries known or likely to have occurred on properties intended for farming, ranching, animal care, or milk production, and relating to those activities were included. Among 72 patients, injuries were related to horses (31%), machinery (17%), ATVs (17%), and hay bales/haystacks (13%). Average age was 45 (3-82), 82% male, and mean ISS of 13 (1-50). Transportation utilized air (31%) and ground (69%) methods, with an average of 35 min (9-132). There was 1 inhospital death and 4 on-scene fatalities. We established baseline transport and injury data for the Idaho TSE system. These results can help our TSE system track improvements intended to increase quality of care. Copyright © 2017. Published by Elsevier Inc.

  3. 76 FR 10018 - Environmental Management Site-Specific Advisory Board, Idaho National Laboratory

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-23

    ... Idaho's 2015 Cleanup Vision Government Budget Cycle American Recovery and Reinvestment Act Idaho Cleanup.... The Deputy Designated Federal Officer is empowered to conduct the meeting in a fashion that will...

  4. Waterford Ventures, LLC

    EPA Pesticide Factsheets

    The EPA is providing notice of a proposed Administrative Penalty Assessment against Waterford Ventures, LLC, a business located at 3100 White Pine Court, Waukee, IA 50263, for alleged violations at the Waterford Pointe Subdivision, located at the intersect

  5. 75 FR 1049 - Wausau Paper Printing & Writing, LLC,

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-08

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2533-046] Wausau Paper Printing & Writing, LLC, Wausau Paper Mills, LLC; Notice of Application for Transfer of License and Soliciting Comments and Motions To Intervene December 30, 2009. On December 10, 2009, Wausau Paper Printing...

  6. State summaries: Idaho

    USGS Publications Warehouse

    Gillerman, V.S.; Weaver, M.J.; Bennett, E.H.

    2006-01-01

    According to the United States Geological Survey (USGS), Idaho's preliminary nonfuel mineral production value jumped to $893 million in 2005. Principal minerals by value included molybdenum concentrates, phosphate rock, sand and gravel, silver and portland cement. The state ranked second in phosphate and garnet production, third in silver and pumice, fourth in molybdenum concentrate production, and 21st overall. Majority of mining increases for the year were spurred by demand for metals by China's growing economy.

  7. 76 FR 35882 - Paulding Wind Farm II, LLC, et al.;

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-20

    ... Wind Farm II, LLC, et al.; Notice of Effectiveness of Exempt Wholesale Generator Status Docket Nos. Paulding Wind Farm II LLC EG11-61-000 Macho Springs Power I, LLC EG11-63-000 Alta Wind III Owner Lessor A EG11-64-000 Alta Wind III Owner Lessor B EG11-65-000 Alta Wind III Owner Lessor C EG11-66-000 Alta Wind...

  8. 76 FR 16405 - Notice of Attendance at PJM INterconnection, L.L.C., Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-23

    ... INterconnection, L.L.C., Meetings The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission and Commission staff may attend upcoming PJM Interconnection, L.L.C., (PJM...: Docket No. EL05-121, PJM Interconnection, L.L.C. Docket No. ER06-456, PJM Interconnection, L.L.C. Docket...

  9. 78 FR 19259 - Notice of Attendance at PJM Interconnection, L.L.C. Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-29

    ... Interconnection, L.L.C. Meetings The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission and Commission staff may attend upcoming PJM Interconnection, L.L.C. (PJM... proceedings: Docket No. EL05-121, PJM Interconnection, L.L.C. Docket No. EL08-14, Black Oak Energy LLC, et al...

  10. Rodney Hunt supplies gates to Idaho Power's Swan Falls

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-02-01

    Rodney Hunt Co. shipped two 30-foot by 28-foot fabricated steel roller gates to Idaho Power Co.'s Swan Falls Dam Project, where they will be installed as draft tube gates. Rodney Hunt said the gates, each weighing approximately 55 tons, are the largest roller gates the company has manufactured. The company supplied the gates under the terms of a contract worth more than $500,000. The gates were ordered as part of Idaho Power's rehabilitation of Swan Falls Dam, which will double the power plant's capacity to 25 MW. New units will begin producing power in 1993, and the project will bemore » completed in 1994. Elsewhere on the Snake River, Idaho Power intends to increase the capacity of its Twin Falls project to 52 MW from 10 MW. Construction is scheduled to start in June 1993.« less

  11. Idaho Marketing Education Core Curriculum. Career Sustaining Level, Specialist Level, Supervisory Level, Entrepreneurial Level.

    ERIC Educational Resources Information Center

    Miller, Linda Wise; Winn, Richard

    This document contains Idaho's marketing education (ME) core curriculum. Presented first are a list of 22 ME strategies that are aligned with the Idaho State Division of Vocational-Technical Education's strategic plan and a chart detailing the career pathways of ME in Idaho (arts and communication, business and management, health services, human…

  12. Idaho Driver Education Administrative Guide.

    ERIC Educational Resources Information Center

    Idaho State Dept. of Education, Boise.

    This guide provides information for school administrators and directors of commercial driver training schools about conducting driver education courses in Idaho. The first part of the guide, which applies to both public schools and commercial schools, covers the following areas: administration, sample letters and forms, instructional time…

  13. Retrofitting the Streetlights in Boise, Idaho

    ScienceCinema

    Young, Clay; Oliver, LeAnn; Bieter, David; Johnson, Michael; Oldemeyer, Neal

    2018-05-11

    Boise, Idaho is using an energy efficiency grant to retrofit hundreds of streetlights throughout the downtown area with energy-efficient LED bulbs, which will save money and improve safety and local quality of life.

  14. 78 FR 16500 - Rolling Bay, LLC and Indus; Transfer of Data

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... contract to perform work for OPP, and access to this information will enable Rolling Bay, LLC and its subcontractor, Indus, to fulfill the obligations of the contract. DATES: Rolling Bay, LLC and its subcontractor... Under Contract No. GS-35F-0072Y, Rolling Bay, LLC and its subcontractor, Indus, will: Capture data that...

  15. 75 FR 16662 - Airworthiness Directives; Kelly Aerospace Energy Systems, LLC Rebuilt Turbochargers

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-02

    ... Airworthiness Directives; Kelly Aerospace Energy Systems, LLC Rebuilt Turbochargers AGENCY: Federal Aviation... airworthiness directive (AD) for certain Kelly Aerospace Energy Systems, LLC (KAES) rebuilt turbochargers. This... Federal holidays. Fax: (202) 493-2251. Contact Kelly Aerospace Energy Systems, LLC, 2900 Selma Highway...

  16. 75 FR 40815 - PJM Interconnection, L.L.C.; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-14

    ... Interconnection, L.L.C.; Notice of Filing July 7, 2010. Take notice that on July 1, 2010, PJM Interconnection, L.L.C. (PJM) filed revised sheets to Schedule 1 of the Amended and Restated Operating Agreement of PJM Interconnection, L.L.C. (Operating Agreement) and the parallel provisions of Attachment K--Appendix of the PJM...

  17. 75 FR 22773 - PJM Interconnection, L.L.C.; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ... Interconnection, L.L.C.; Notice of Filing April 23, 2010. Take notice that on April 22, 2010, PJM Interconnection, L.L.C. (PJM) filed revised tariff sheets to its Schedule 1 of the Amended and Restated Operating... (Commission) March 23, 2010 Order on Compliance Filing, PJM Interconnection, L.L.C., 130 FERC ] 61,230 (2010...

  18. 77 FR 34378 - PJM Interconnection, L.L.C.; Notice of Complaint

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-11

    ... Interconnection, L.L.C.; Notice of Complaint Take notice that on June 1, 2012, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824(e), PJM Interconnection, L.L.C. (PJM) filed proposed revisions to the Amended and Restated Operating Agreement of PJM Interconnection L.L.C. (Operating Agreement) to...

  19. Small Towns in a Rural Area: A Study of the Problems of Small Towns in Idaho. Idaho Agricultural Experiment Station Research Bulletin No. 91, April 1976.

    ERIC Educational Resources Information Center

    Hamilton, J. R.; And Others

    Using aggregate data from several Idaho counties and towns, the study examined the economic forces which pressure small town people and merchants--pressures which ultimately shape and will shape small towns in areas like Idaho. Six towns chosen for intensive study were Priest River, Cottonwood, Riggins, Shoshone, Oakley, and Malad. Focusing on…

  20. Estimated Perennial Streams of Idaho and Related Geospatial Datasets

    USGS Publications Warehouse

    Rea, Alan; Skinner, Kenneth D.

    2009-01-01

    The perennial or intermittent status of a stream has bearing on many regulatory requirements. Because of changing technologies over time, cartographic representation of perennial/intermittent status of streams on U.S. Geological Survey (USGS) topographic maps is not always accurate and (or) consistent from one map sheet to another. Idaho Administrative Code defines an intermittent stream as one having a 7-day, 2-year low flow (7Q2) less than 0.1 cubic feet per second. To establish consistency with the Idaho Administrative Code, the USGS developed regional regression equations for Idaho streams for several low-flow statistics, including 7Q2. Using these regression equations, the 7Q2 streamflow may be estimated for naturally flowing streams anywhere in Idaho to help determine perennial/intermittent status of streams. Using these equations in conjunction with a Geographic Information System (GIS) technique known as weighted flow accumulation allows for an automated and continuous estimation of 7Q2 streamflow at all points along a stream, which in turn can be used to determine if a stream is intermittent or perennial according to the Idaho Administrative Code operational definition. The selected regression equations were applied to create continuous grids of 7Q2 estimates for the eight low-flow regression regions of Idaho. By applying the 0.1 ft3/s criterion, the perennial streams have been estimated in each low-flow region. Uncertainty in the estimates is shown by identifying a 'transitional' zone, corresponding to flow estimates of 0.1 ft3/s plus and minus one standard error. Considerable additional uncertainty exists in the model of perennial streams presented in this report. The regression models provide overall estimates based on general trends within each regression region. These models do not include local factors such as a large spring or a losing reach that may greatly affect flows at any given point. Site-specific flow data, assuming a sufficient period of

  1. 77 FR 65374 - Environmental Management Site-Specific Advisory Board, Idaho National Laboratory

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-26

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Idaho National... meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Idaho National Laboratory... management in the areas of environmental restoration, waste management, and related activities. Tentative...

  2. Morphological and Molecular Identification of Globodera pallida Associated with Potato in Idaho

    PubMed Central

    Skantar, A. M.; Handoo, Z. A.; Carta, L. K.; Chitwood, D. J.

    2007-01-01

    The identity of a newly discovered population of pale potato cyst nematode Globodera pallida associated with potato in eastern Idaho was established by morphological and molecular methods. Morphometrics of cysts and second-stage juveniles were generally within the expected ranges for G. pallida with some variations noted. The Idaho population and paratype material from Epworth, Lincolnshire, England, both showed variations in tail shape, with bluntly rounded to finely pointed tail termini. Compared to literature values for the paratypes, second-stage juveniles of the Idaho population had a somewhat shorter mean body length, and cysts had a slightly higher mean distance from the anus to the nearest edge of the fenestra. PCR-RFLP of the rDNA ITS region, sequence-specific multiplex PCR and DNA sequence comparisons all confirmed the identity of the Idaho population as G. pallida. The ITS rDNA sequence of the Idaho isolate was identical to those from York, England, and the Netherlands. Species-specific primers that can positively identify the tobacco cyst nematode Globodera tabacum were also developed, providing a new assay for distinguishing this species from G. pallida and the golden potato cyst nematode Globodera rostochiensis. PMID:19259482

  3. Idaho forestry best management practices: Compilation of research on their effectiveness

    Treesearch

    Kathleen A. Seyedbagheri

    1996-01-01

    A search was conducted for quantitative Idaho research results on the effectiveness of the Idaho Forest Practices Act rules and regulations pertaining to timber harvest and forest road construction and maintenance. These rules and regulations are designated as the "best management practices" for the prevention of nonpoint source pollution from silviculture...

  4. 75 FR 7440 - Notice of Idaho Panhandle Resource Advisory Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-19

    ... Self-Determination Act of 2000 (Public Law 110-343) the Idaho Panhandle National Forest's Idaho... for a business meeting. The business meeting is open to the public. DATES: February 19, 2010... business meeting. The public forum begins at 11 a.m. Dated: February 10, 2010. Ranotta K. McNair, Forest...

  5. Portland Cement Concrete Material Characterization for Pavement ME Design Implementation in Idaho

    DOT National Transportation Integrated Search

    2017-07-01

    The objective of this research project was to develop a concrete material database as the first step towards the implementation of Pavement ME for rigid pavement design in the state of Idaho. Eight concrete mixtures from five of Idaho Transportation ...

  6. 76 FR 39080 - Environmental Management Site-Specific Advisory Board, Idaho National Laboratory

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-05

    ... DEPARTMENT OF ENERGY Environmental Management Site-Specific Advisory Board, Idaho National... meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Idaho National Laboratory... recommendations to DOE-EM and site management in the areas of environmental restoration, waste management, and...

  7. Quality of ground water in Idaho

    USGS Publications Warehouse

    Yee, Johnson J.; Souza, William R.

    1987-01-01

    The major aquifers in Idaho are categorized under two rock types, sedimentary and volcanic, and are grouped into six hydrologic basins. Areas with adequate, minimally adequate, or deficient data available for groundwater-quality evaluations are described. Wide variations in chemical concentrations in the water occur within individual aquifers, as well as among the aquifers. The existing data base is not sufficient to describe fully the ground-water quality throughout the State; however, it does indicate that the water is generally suitable for most uses. In some aquifers, concentrations of fluoride, cadmium, and iron in the water exceed the U.S. Environmental Protection Agency's drinking-water standards. Dissolved solids, chloride, and sulfate may cause problems in some local areas. Water-quality data are sparse in many areas, and only general statements can be made regarding the areal distribution of chemical constituents. Few data are available to describe temporal variations of water quality in the aquifers. Primary concerns related to special problem areas in Idaho include (1) protection of water quality in the Rathdrum Prairie aquifer, (2) potential degradation of water quality in the Boise-Nampa area, (3) effects of widespread use of drain wells overlying the eastern Snake River Plain basalt aquifer, and (4) disposal of low-level radioactive wastes at the Idaho National Engineering Laboratory. Shortcomings in the ground-water-quality data base are categorized as (1) multiaquifer sample inadequacy, (2) constituent coverage limitations, (3) baseline-data deficiencies, and (4) data-base nonuniformity.

  8. 76 FR 36532 - Iberdrola Renewables, Inc., PacifiCorp, NextEra Energy Resources, LLC, Invenergy Wind North...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-22

    ... Renewables, Inc., PacifiCorp, NextEra Energy Resources, LLC, Invenergy Wind North America LLC, Horizon Wind...), Iberdrola Renewables, Inc., PacifiCorp, NextEra Energy Resources, LLC, Invenergy Wind North America LLC, and Horizon Wind Energy LLC (Complainants) filed a formal complaint against Bonneville Power Administration...

  9. 78 FR 20149 - Sage Quant Management LLC, et al.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-03

    ... Quant Management LLC, et al.; Notice of Application March 28, 2013. AGENCY: Securities and Exchange...)(1)(A) and 12(d)(1)(B) of the Act. Applicants: Sage Quant Management LLC (``Adviser''), and Sage Quant ETF Trust (``Trust'') and ETF Distributors LLC. SUMMARY: Summary of Application: Applicants...

  10. 77 FR 74179 - Stingray Pipeline Company, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-13

    ... Pipeline Company, L.L.C.; Notice of Application Take notice that on November 26, 2012, Stingray Pipeline Company, L.L.C. (Stingray), 1100 Louisiana, Suite 3300, Houston, Texas 77002, filed in the above... Roney, Manager--Regulatory Affairs, Stingray Pipeline Company, L.L.C., 1100 Louisiana, Suite 3300...

  11. Idaho Transportation Department 2009 partnership survey.

    DOT National Transportation Integrated Search

    2010-06-01

    The report discusses the results of an electronic survey of 1,500 individual stakeholders of the Idaho Transportation Department (ITD). The purpose of this survey, which was conducted in August and September 2009, was to gauge stakeholders satisfa...

  12. 76 FR 51082 - Self-Regulatory Organizations; International Securities Exchange, LLC; Notice of Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-17

    ...., International Securities Exchange LLC, The NASDAQ Stock Market LLC, New York Stock Exchange LLC, NYSE Amex LLC... include all remaining National Market System (``NMS'') stocks (``Phase III Securities'').\\9\\ The new pilot... executions, so that the rule will continue to operate in the same manner after changes to the single stock...

  13. Gravity survey in part of the Snake River Plain, Idaho - a preliminary report

    USGS Publications Warehouse

    Baldwin, Harry L.; Hill, David P.

    1960-01-01

    During the early summer of 1959, a total of 1,187 gravity stations were occupied on the western part of the Snake River plain in Idaho. An area of 2,000 square miles extending from Glenns Ferry, Idaho, to Caldwell, Idaho, was covered with a station density of one station per two square miles. An additional 1,200 square miles of surrounding area, mainly from Caldwell, Idaho, to the Oregon-Idaho state line, was covered with a density of one station per seven square miles. The mean reproducibility of the observed gravities of these stations was 0.05 milligal, with a maximum discrepancy of 0.2 milligal. Gravity data were reduced to simple Bouguer values using a combined free-air and Bouguer correction of 0.06 milligal per foot. The only anomalies found with closure in excess of 10 milligals are two elongated highs, orientated northwest-southeast, with the northwestern high offset to the northeast by 10 miles. The smaller of these highs extends from Meridian, Idaho, to Nyssa, Oregon, and the larger extends from Swan Falls, Idaho, to Glenns Ferry, Idaho. The maximum value recorded is a simple Bouguer value of -66.5 milligals with respect to the International Ellipsoid. Gradients on the sides of these highs are largest on the northeast sides, reaching six milligals per mile in places. Graticule interpretations of a profile across the southeastern high using a density contrast of 0.3 gm per cubic centimeter indicate an accumulation of lava reaching a thickness of at least 28,000 feet. The Snake River investigation was made for the purpose of searching out, defining, and interpreting gravity anomalies present on the western part of the Snake River lava plain in Idaho. In particular, it was desired to further define gradients associated with the gravity high shown by the regional work of Bonini and Lavin (1957). It was not planned to cover any specific area, but rather to let the observed anomalies determine the course of the field work. The study was undertaken as part of a

  14. 75 FR 82004 - Environmental Management Site-Specific Advisory Board, Idaho National Laboratory

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-29

    ... Laboratory AGENCY: Department of Energy. ACTION: Notice of open meeting. SUMMARY: This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Idaho National Laboratory...--Radioactive Waste Management. Public Participation: The EM SSAB, Idaho National Laboratory, welcomes the...

  15. 78 FR 12747 - Environmental Management Site-Specific Advisory Board, Idaho National Laboratory

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-25

    ... Laboratory AGENCY: Department of Energy. ACTION: Notice of open meeting. SUMMARY: This notice announces a meeting of the Environmental Management Site-Specific Advisory Board (EM SSAB), Idaho National Laboratory... Management System Public Participation: The EM SSAB, Idaho National Laboratory, welcomes the attendance of...

  16. 77 FR 788 - Southern LNG Company, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12-31-000] Southern LNG Company, L.L.C.; Notice of Application Take notice that on December 15, 2011, Southern LNG Company, L.L.C... Affairs, Southern LNG Company, L.L.C., 569 Brookwood Village, Suite 501, Birmingham, Alabama 35209, by...

  17. 76 FR 71961 - Elba Express Company, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12-11-000] Elba Express Company, L.L.C.; Notice of Application Take notice that on October 31, 2011, Elba Express Company, L.L.C... directed to Glenn A. Sheffield, Director, Rates & Regulatory Affairs, Elba Express Company, L.L.C., 569...

  18. Health of Idaho's Forests: A Summary of conditions, issues and implications

    Treesearch

    David Atkins; James Byler; Ladd Livingston; Paul Rogers; Dayle Bennett

    1999-01-01

    The desire for lasting and healthy forests in which to live, work and play is something we all share - not only in Idaho but across our nation. In Idaho we have a number of forest health issues confronting us, our forest ecosystems are not as resilient as desired and the ability to sustain our communities is at risk.

  19. 77 FR 68115 - Millennium Pipeline Company, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-15

    ...] Millennium Pipeline Company, L.L.C.; Notice of Application Take notice that on November 1, 2012, Millennium Pipeline Company, L.L.C. (Millennium), One Blue Hill Plaza, Seventh Floor, P.O. Box 1565, Pearl River, New... system to the existing interconnection with Algonquin Gas Transmission, L.L.C. in Ramapo, New York and...

  20. 75 FR 51989 - Southern LNG Company, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-24

    ... Company, L.L.C.; Notice of Application August 16, 2010. Take notice that on August 4, 2010, Southern LNG Company, L.L.C. (Southern LNG), Post Office Box 2563, Birmingham, Alabama 35202-2563, filed in the above.... Sheffield, Director--Rates and Regulatory, Southern LNG Company, L.L.C., 569 Brookwood Village, Suite 501...

  1. 76 FR 9266 - Proposed Amendment of Class D and Class E Airspace; Idaho Falls, ID

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-17

    ...-0023; Airspace Docket No. 11-ANM-2] Proposed Amendment of Class D and Class E Airspace; Idaho Falls, ID...: This action proposes to amend the Class D and Class E airspace areas at Idaho Falls, ID, by changing the name of the airport to Idaho Falls Regional Airport, and adjusting the geographic coordinates of...

  2. Idaho's Forest Resources, 2004-2009

    Treesearch

    Chris Witt; John D. Shaw; Michael T. Thompson; Sara A. Goeking; Jim Menlove; Michael C. Amacher; Todd A. Morgan; Charles Werstak

    2012-01-01

    This report presents a summary of the most recent inventory information for Idaho's forest lands. The report includes descriptive highlights and tables of area, number of trees, biomass, volume, growth, mortality, and removals. Most of the tables are organized by forest type, species, diameter class, or owner group. The report also describes inventory design,...

  3. Fires in Idaho and Montana

    NASA Technical Reports Server (NTRS)

    2002-01-01

    2000 continues to be the worst fire season in the United States in decades. By August 8, 2000, fires in Montana and Idaho had burned more than 250,000 acres. Resources were stretched so thin that Army and Marine soldiers were recruited to help fight the fires. President Clinton visited Payette National Forest to lend moral support to the firefighters. Dense smoke from Idaho and western Montana is visible stretching all the way to North and South Dakota in this image from the Sea-viewing Wide Field-of-view Sensor (SeaWiFS). The image was taken on August 7, 2000. Although the primary mission of SeaWiFS is to measure the biology of the ocean, it also provides stunning color imagery of the Earth's surface. For more information about fires in the U.S., visit the National Interagency Fire Center. To learn more about using satellites to monitor fires, visit Global Fire Monitoring and New Technology for Monitoring Fires from Space in the Earth Observatory. Provided by the SeaWiFS Project, NASA/Goddard Space Flight Center, and ORBIMAGE

  4. Radionuclides, inorganic constituents, organic compounds, and bacteria in water from selected wells and springs from the southern boundary of the Idaho National Engineering Laboratory to the Hagerman area, Idaho, 1992

    USGS Publications Warehouse

    Bartholomay, R.C.; Edwards, D.D.; Campbell, L.J.

    1994-01-01

    Dissolved concentrations of radon-222, a naturally occurring radioactive gas, are found in water in Idaho. The U.S. Geological Survey collected water samples for radon-222 analyses from 339 Idaho wells and springs during 1989-91. These water samples were collected as part of ongoing monitoring programs with the Idaho Department of Water Resources and the U.S. Department of Energy. Concentrations of dissolved radon-222 ranged from -58+30 to 5,715+66 picocuries per liter; the mean and median concentrations were 446+35 and 242+25 picocuries per liter, respectively.

  5. 76 FR 13271 - DeQueen and Eastern Railroad, LLC-Corporate Family Transaction Exemption-Texas, Oklahoma...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-10

    ... Eastern Railroad, LLC--Corporate Family Transaction Exemption--Texas, Oklahoma & Eastern Railroad, LLC DeQueen and Eastern Railroad, LLC (DQ&E) and Texas, Oklahoma & Eastern Railroad, LLC (TOE), have filed a... the competitive balance with carriers outside the corporate family. Under 49 U.S.C. 10502(g), the...

  6. Ambient Construction, LLC Information Sheet

    EPA Pesticide Factsheets

    Ambient Construction, LLC (the Company) is located in Tallahassee, Florida. The settlement involves renovation activities conducted at property constructed prior to 1978, located in Tallahassee, Florida.

  7. 75 FR 63466 - Sawgrass Storage LLC; Notice of Petition

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ... Storage LLC; Notice of Petition October 7, 2010. Take notice that on September 27, 2010, Sawgrass Storage LLC (Sawgrass Storage), 3333 Warrenville Road, Suite 630, Lisle, Illinois 60532, filed in Docket No..., Sawgrass Storage proposes to drill a test well to determine the feasibility of developing a depleted...

  8. 78 FR 3042 - J.P. Morgan Securities LLC, et al.; Notice of Application and Temporary Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-15

    ... Management Inc. (``BSAM''), Bear Stearns Health Innoventures Management, L.L.C. (``BSHIM''), BSCGP Inc. (``BSGCP''), Constellation Growth Capital LLC (``Constellation''), Constellation Ventures Management II, LLC (``Constellation II''), Highbridge Capital Management, LLC (``Highbridge''), JF International...

  9. 78 FR 60273 - David E. Cereghino, Idaho County Light & Power Cooperative Association, Inc.; Notice of Transfer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-01

    .... Cereghino, Idaho County Light & Power Cooperative Association, Inc.; Notice of Transfer of Exemption 1. By letter filed March 25, 2011, David E. Cereghino and Idaho County Light & Power Cooperative Association... No. 5865, originally issued April 6, 1984,\\1\\ has been transferred to Idaho County Light & Power...

  10. 78 FR 41782 - Nez Perce-Clearwater National Forests; Idaho; Notice To Proceed With Forest Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-11

    ... DEPARTMENT OF AGRICULTURE Forest Service Nez Perce-Clearwater National Forests; Idaho; Notice To... worked with University of Idaho staff to develop a strategy on how to engage the public in the Forest... orientation meetings, cohosted by County Commissioners and facilitated by University of Idaho staff, were held...

  11. Using extension phosphorus uptake research to improve Idaho's nutrient management planning program

    USDA-ARS?s Scientific Manuscript database

    Irrigated silage corn is the main crop used for phosphorus removal; however little is known about the actual amounts of phosphorus removed under southern Idaho growing conditions. The purpose of this study was to survey phosphorus removal by irrigated corn grown for silage in southern Idaho under va...

  12. JWB Companies, LLC Information Sheet

    EPA Pesticide Factsheets

    JWB Companies, LLC (the Company) is located in Jacksonville, Florida. The settlement involves renovation activities conducted at a property constructed prior to 1978, located in Jacksonville, Florida.

  13. 77 FR 56693 - Self-Regulatory Organizations; New York Stock Exchange LLC; Notice of Filing and Immediate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ...'' Reflecting the Recent Name Change of NYSE Amex LLC to NYSE MKT LLC September 7, 2012. Pursuant to Section 19...'' with ``NYSE MKT'' to reflect the recent name change of NYSE Amex LLC to NYSE MKT LLC. The text of the... references to ``NYSE Amex'' with ``NYSE MKT'' to reflect the recent name change of NYSE Amex LLC to NYSE MKT...

  14. Defining landscapes suitable for restoration of grizzly bears (Ursus arctos) in Idaho

    USGS Publications Warehouse

    Merrill, Troy; Mattson, D.J.; Wright, R.G.; Quigley, Howard B.

    1999-01-01

    Informed management of large carnivores depends on the timely and useful presentation of relevant information. We describe an approach to evaluating carnivore habitat that uses pre-existing qualitative and quantitative information on humans and carnivores to generate coarse-scale maps of habitat suitability, habitat productivity, potential reserves, and areas of potential conflict. We use information pertinent to the contemplated reintroduction of grizzly bears Ursus arctos horribilis into central Idaho to demonstrate our approach. The approach uses measures of human numbers, their estimated distribution, road and trail access, and abundance and quality of bear foods to create standardized indices that are analogues of death and birth rates, respectively; the first subtracted from the second indicates habitat suitability (HS). We calibrate HS to sightings of grizzly bears in two ecosystems in northern Idaho and develop an empirical model from these same sightings based on piece-wise treatment of the variables contained in HS. Depending on whether the empirical model or HS is used, we estimate that there is 14 800 km2 of suitable habitat in two blocks or 37 100 km2 in one block in central Idaho, respectively. Both approaches show suitable habitat in the current Evaluation Area and in an area of southeastern Idaho centered on the Palisades Reservoir. Areas of highly productive habitat are concentrated in northern and western Idaho and in the Palisades area. Future conflicts between humans and bears are most likely to occur on the western and northern margins of suitable habitat in central Idaho, rather than to the east, where opposition to reintroduction of grizzly bears is currently strongest.

  15. 75 FR 47587 - Wabash Gas Storage LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-06

    ... LLC (Petitioner), 1044 North 115th Street, Suite 400, Omaha, NE 68154-4446, filed in Docket No. CP10... Storage LLC, 1044 North 115th Street, Suite 400, Omaha, NE 68154-4446, or by calling (402) 691- 9711...

  16. Subsurface information from eight wells drilled at the Idaho National Engineering Laboratory, southeastern Idaho

    USGS Publications Warehouse

    Goldstein, F.J.; Weight, W.D.

    1982-01-01

    The Idaho National Engineering Laboratory (INEL) covers about 890 square miles of the eastern Snake River Plain, in southeastern Idaho. The eastern Snake River Plain is a structural basin which has been filled with thin basaltic lava flows, rhyolitic deposits, and interbedded sediments. These rocks form an extensive ground-water reservoir known as the Snake River Plain aquifer. Six wells were drilled and two existing wells were deepened at the INEL from 1969 through 1974. Interpretation of data from the drilling program confirms that the subsurface is dominated by basalt flows interbedded with layers of sediment, cinders, and silicic volcanic rocks. Water levels in the wells show cyclic seasonal fluctuations of maximum water levels in winter and minimum water levels in mid-summer. Water levels in three wells near the Big Lost River respond to changes in recharge to the Snake River Plain aquifer from the Big Lost River. Measured water levels in multiple piezometers in one well indicate increasing pressure heads with depth. A marked decline in water levels in the wells since 1977 is attributed to a lack of recharge to the Snake River Plain aquifer.

  17. 78 FR 23522 - Idaho Roadless Rule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ... the Buckhorn Ridge Idaho Roadless Areas to the list under the Kootenai National Forest. Notice is given pursuant to 36 CFR 294.27(b), that the Chief proposes to issue the modifications after a 45-day... GFRG SAHTS FPSA Kootenai Buckhorn Ridge 661 ....... ......... X ....... ....... ....... * * * * * Dated...

  18. Idaho storm warning system operational test

    DOT National Transportation Integrated Search

    2000-12-01

    The Storm Warning Project was initiated in 1993 as a result of a large number of serious traffic crashes that occurred during periods of low visibility on I-84 in southeastern Idaho between 1988 and 1993. The purpose of the project was to determine i...

  19. Termination of Safeguards for Accountable Nuclear Materials at the Idaho National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Michael Holzemer; Alan Carvo

    2012-04-01

    Termination of safeguards ends requirements of Nuclear Material Control and Accountability (MC&A) and thereby removes the safeguards basis for applying physical protection requirements for theft and diversion of nuclear material, providing termination requirements are met as described. Department of Energy (DOE) M 470.4 6 (Nuclear Material Control and Accountability [8/26/05]) stipulates: 1. Section A, Chapter I (1)( q) (1): Safeguards can be terminated on nuclear materials provided the following conditions are met: (a) 'If the material is special nuclear material (SNM) or protected as SNM, it must be attractiveness level E and have a measured value.' (b) 'The material hasmore » been determined by DOE line management to be of no programmatic value to DOE.' (c) 'The material is transferred to the control of a waste management organization where the material is accounted for and protected in accordance with waste management regulations. The material must not be collocated with other accountable nuclear materials.' Requirements for safeguards termination depend on the safeguards attractiveness levels of the material. For attractiveness level E, approval has been granted from the DOE Idaho Operations Office (DOE ID) to Battelle Energy Alliance, LLC (BEA) Safeguards and Security (S&S). In some cases, it may be necessary to dispose of nuclear materials of attractiveness level D or higher. Termination of safeguards for such materials must be approved by the Departmental Element (this is the DOE Headquarters Office of Nuclear Energy) after consultation with the Office of Security.« less

  20. 77 FR 40088 - Rollins College; T.A. Loving Co.; US Ecology Idaho, Inc.; and West Pharmaceutical Services, Inc...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-06

    ...] Rollins College; T.A. Loving Co.; US Ecology Idaho, Inc.; and West Pharmaceutical Services, Inc... 11481 1910.37(i). T.A. Loving Co V-74-43 04/13/1976 41 FR 15483 1918.66(f)(1)(i). US Ecology Idaho, Inc.... US Ecology Idaho, Inc. The Agency granted Envirosafe Services, Inc. (now US Ecology Idaho, Inc.), a...

  1. Cougar Holdings, LLC Information Sheet

    EPA Pesticide Factsheets

    Cougar Holdings, LLC (the Company) is located in Colorado Springs, Colorado. The settlement involves renovation activities conducted at a property constructed prior to 1978, located in Denver, Colorado.

  2. Public Notice: Proposed Land Ban Exemption to Ineos USA LLC

    EPA Pesticide Factsheets

    Public notice for proposed Land Ban Exemption Reissuance, for Ineos USA LLC, to continue to inject hazardous waste deep underground in Allen County, OH. EPA plans to reissue a Land Ban Exemption for Ineos USA LLC in Allen Co., OH.

  3. Rock Equity Holdings, LLC

    EPA Pesticide Factsheets

    The EPA is providing notice of an Administrative Penalty Assessment in the form of an Expedited Storm Water Settlement Agreement against Rock Equity Holdings, LLC, for alleged violations at The Cove at Kettlestone/98th Street Reconstruction located at 3015

  4. 77 FR 51837 - Self-Regulatory Organizations; NYSE MKT LLC; Notice of Filing and Immediate Effectiveness of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-27

    ... Amending the NYSE Amex Options LLC Limited Liability Company Agreement To Eliminate Certain Restrictions... Options LLC (``NYSE Amex Options'') Limited Liability Company Agreement (``LLC Agreement'') to eliminate... to amend the LLC Agreement to eliminate certain restrictions relating to the qualification of...

  5. 76 FR 42704 - Sky River LLC; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. ER11-3277-000; ER11-3277-001] Sky River LLC; Notice of Filing Take notice that, on July 8, 2011, Sky River LLC filed to amend its Open Access Transmission Tariff (OATT) filing, submitted on April 1, 2011 and amended on April 7...

  6. U.S. hydropower resource assessment for Idaho

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Conner, A.M.; Francfort, J.E.

    1998-08-01

    The US Department of Energy is developing an estimate of the undeveloped hydropower potential in the US. The Hydropower Evaluation Software (HES) is a computer model that was developed by the Idaho National Engineering and Environmental Laboratory for this purpose. HES measures the undeveloped hydropower resources available in the US, using uniform criteria for measurement. The software was developed and tested using hydropower information and data provided by the Southwestern Power Administration. It is a menu-driven program that allows the personal computer user to assign environmental attributes to potential hydropower sites, calculate development suitability factors for each site based onmore » the environmental attributes present, and generate reports based on these suitability factors. This report describes the resource assessment results for the State of Idaho.« less

  7. 78 FR 64020 - Manufacturer of Controlled Substances, Notice of Registration, Siegfried USA, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ..., Notice of Registration, Siegfried USA, LLC The Notice dated July 23, 2013, and published in the Federal Register on August 1, 2013, 78 FR 46613, page 18338, Siegfried (USA), LLC., 33 Industrial Park Road...), and Poppy Straw Concentrate (9670). On August 6, 2013, Siegfried (USA), LLC., subsequently withdrew...

  8. 77 FR 23472 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-19

    ... Pipeline Company, L.L.C.; Notice of Application Take notice that on April 4, 2012, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed an application in the..., Manager, Certificates, Tennessee Gas Pipeline Company, L.L.C., 1001 Louisiana Street, Houston, Texas 77002...

  9. 78 FR 6313 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-30

    ... Pipeline Company, L.L.C.; Notice of Application Take notice that on January 14, 2013, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed an application in... directed to Thomas G. Joyce, Manager, Certificates, Tennessee Gas Pipeline Company, L.L.C. 1001 Louisiana...

  10. 77 FR 76319 - Self-Regulatory Organizations; BOX Options Exchange LLC; Order Approving Minor Rule Violation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-27

    ... Organizations; BOX Options Exchange LLC; Order Approving Minor Rule Violation Plan for BOX Options Exchange LLC December 20, 2012. On October 15, 2012, BOX Options Exchange LLC (the ``Exchange'') filed with the... Rule 19d-1(c)(2) under the Act,\\13\\ that the proposed MRVP for BOX Options Exchange LLC, File No. 4-655...

  11. Geothermal Reservoir Temperatures in Southeastern Idaho using Multicomponent Geothermometry

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Neupane, Ghanashyam; Mattson, Earl D.; McLing, Travis L.

    Southeastern Idaho exhibits numerous warm springs, warm water from shallow wells, and hot water within oil and gas test wells that indicate a potential for geothermal development in the area. Although the area exhibits several thermal expressions, the measured geothermal gradients vary substantially (19 – 61 ºC/km) within this area, potentially suggesting a redistribution of heat in the overlying ground water from deeper geothermal reservoirs. We have estimated reservoir temperatures from measured water compositions using an inverse modeling technique (Reservoir Temperature Estimator, RTEst) that calculates the temperature at which multiple minerals are simultaneously at equilibrium while explicitly accounting for themore » possible loss of volatile constituents (e.g., CO2), boiling and/or water mixing. Compositions of a selected group of thermal waters representing southeastern Idaho hot/warm springs and wells were used for the development of temperature estimates. The temperature estimates in the the region varied from moderately warm (59 ºC) to over 175 ºC. Specifically, hot springs near Preston, Idaho resulted in the highest temperature estimates in the region.« less

  12. 75 FR 22628 - Cadence Innovation, LLC, Groesbeck Plant, Including On-Site Leased Workers from Michigan Staffing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-29

    ... Human Capital Staffing (TA-W-64,715C); Cadence Innovation, LLC, Hillsdale Plant, Hillsdale, Michigan... Innovation, LLC, Groesbeck Plant, Including On-Site Leased Workers from Michigan Staffing, LLC, Modern Professional Services, LLC, TAC Transportation, Time Services, Inc., and Human Capital Staffing Clinton...

  13. Idaho College Populations 1970-71.

    ERIC Educational Resources Information Center

    Caldwell, Harry H.

    This study sought to identify in a meaningful and standardized fashion the in-state and out-of-state students at the freshman, junior, and graduate levels for each of the 9 colleges in the state of Idaho. It further sought to ascertain for each college the main contributing areas or zones in the state for freshman and junior students and to…

  14. Idaho Habitat/Natural Production Monitoring Part I, 1995 Annual Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hall-Griswold, J.A.; Petrosky, C.E.

    The Idaho Department of Fish and Game (IDFG) has been monitoring trends in juvenile spring and summer chinook salmon, Oncorhynchus tshawytscha, and steelhead trout, O. mykiss, populations in the Salmon, Clearwater, and lower Snake River drainages for the past 12 years. This work is the result of a program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric power plants on the Columbia River. Project 91-73, Idaho Natural Production Monitoring, consists of two subprojects: General Monitoring and Intensive Monitoring. This report updates and summarizes data through 1995 for the General Parr Monitoring (GPM)more » database to document status and trends of classes of wild and natural chinook salmon and steelhead trout populations. A total of 281 stream sections were sampled in 1995 to monitor trends in spring and summer chinook salmon Oncorhynchus tshawytscha and steelhead trout O. mykiss parr populations in Idaho. Percent carrying capacity and density estimates were summarized for 1985--1995 by different classes of fish: wild A-run steelhead trout, wild B-run steelhead trout, natural A-run steelhead trout, natural B-run steelhead trout, wild spring and summer chinook salmon, and natural spring and summer chinook salmon. The 1995 data were also summarized by subbasins as defined in Idaho Department of Fish and Game`s 1992--1996 Anadromous Fish Management Plan.« less

  15. 78 FR 30333 - Manufacturer of Controlled Substances; Notice of Registration; Siegfried (Usa), Llc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-22

    ...; Notice of Registration; Siegfried (Usa), Llc. By Notice dated November 19, 2012, and published in the Federal Register on November 27, 2012, 77 FR 70825, Siegfried (USA), LLC., 33 Industrial Park Road... 21 U.S.C. 823(a) and determined that the registration of Siegfried (USA), LLC., to manufacture the...

  16. 78 FR 64020 - Manufacturer of Controlled Substances; Notice of Registration; Siegfried USA, LLC

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ...; Notice of Registration; Siegfried USA, LLC By Notice dated May 22, 2013, and published in the Federal Register on May 30, 2013, 78 FR 32458, Siegfried USA, LLC., 33 Industrial Park Road, Pennsville, New Jersey... determined that the registration of Siegfried USA, LLC., to manufacture the listed basic class of controlled...

  17. 77 FR 8247 - Tennessee Gas Pipeline Company, L.L.C. Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-14

    ... Pipeline Company, L.L.C. Notice of Application Take notice that on February 2, 2012, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed an application in Docket... Gas Pipeline Company, L.L.C., 1001 Louisiana Street, Houston, Texas 77002, by telephone at (713) 420...

  18. 77 FR 43277 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    ... Pipeline Company, L.L.C.; Notice of Application Take notice that on July 6, Tennessee Gas Pipeline Company, L.L.C. (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed in the above referenced... Company, L.L.C. 1001 Louisiana Street, Houston, Texas 77002, or telephone (713) 420- 3299, or facsimile...

  19. 75 FR 51031 - Natural Gas Pipeline Company of America LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-18

    ... Pipeline Company of America LLC; Notice of Application August 12, 2010. Take notice that on July 30, 2010, Natural Gas Pipeline Company of America LLC (Natural Gas), 3250 Lacey Road, Suite 700, Downers Grove..., Regulatory Products and Services, Natural Gas Pipeline Company of America LLC, 3250 Lacey Road, Suite 700...

  20. 78 FR 67350 - Natural Gas Pipeline Company of America LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-12

    ... Pipeline Company of America LLC; Notice of Application Take notice that on October 18, 2013 Natural Gas Pipeline Company of America LLC (Natural), at 3250 Lacey Road, Downers Grove, IL 60615, filed an..., Natural Gas Pipeline Company of America LLC, 3250 Lacey Road, Suite 700, Downers Grove, IL 60515, or by...

  1. The Edwardsburg Formation and related rocks, Windermere Supergroup, central Idaho, USA

    USGS Publications Warehouse

    Lund, Karen; Aleinikoff, John N.; Evans, Karl V.

    2011-01-01

    In central Idaho, Neoproterozoic stratified rocks are engulfed by the Late Cretaceous Idaho batholith and by Eocene volcanic and plutonic rocks of the Challis event. Studied sections in the Gospel Peaks and Big Creek areas of west-central Idaho are in roof pendants of the Idaho batholith. A drill core section studied from near Challis, east-central Idaho, lies beneath the Challis Volcanic Group and is not exposed at the surface. Metamorphic and deformational overprinting, as well as widespread dismembering by the younger igneous rocks, conceals many primary details. Despite this, these rocks provide important links for regional correlations and have produced critical geochronological data for two Neoproterozoic glacial periods in the North American Cordillera. At the base of the section, the more than 700-m-thick Edwardsburg Formation (Fm.) contains interlayered diamictite and volcanic rocks. There are two diamictite-bearing members in the Edwardsburg Fm. that are closely related in time. Each of the diamictites is associated with intermediate composition tuff or flow rocks and the diamictites are separated by mafic volcanic rocks. SHRIMP U–Pb dating indicates that the lower diamictite is about 685±7 Ma, whereas the upper diamictite is 684±4 Ma. The diamictite units are part of a cycle of rocks from coarse clastic, to fine clastic, to carbonate rocks that, by correlation to better preserved sections, are thought to record an older Cryogenian glacial to interglacial period in the northern US Cordillera. The more than 75-m-thick diamictite of Daugherty Gulch is dated at 664±6 Ma. This unit is preserved only in drill core and the palaeoenvironmental interpretation and local stratigraphic relations are non-unique. Thus, the date for this diamictite may provide a date for a newly recognized glaciogenic horizon or may be a minimum age for the diamictite in the Edwardsburg Fm. The c. 1000-m-thick Moores Lake Fm. is an amphibolite facies diamictite in which glacial

  2. 76 FR 30974 - Jason Incorporated, Janesville Accoustics Division, Subsidiary of Jason Partners Holdings LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-27

    ... of Jason Incorporated, Janesville Acoustics Division, Subsidiary of Jason Partners Holdings LLC... Incorporated, Janesville Acoustics Division, Subsidiary of Jason Partners Holdings LLC to be considered leased... Incorporated, Janesville Acoustics Division, Subsidiary of Jason Partners Holdings LLC. The amended notice...

  3. 5 Steps to Food Preservation Program Meets the Needs of Idaho Families

    ERIC Educational Resources Information Center

    Dye, Lorie; Hoffman, Katie

    2014-01-01

    University of Idaho FCS Extension Educators in southeastern Idaho developed a five-lesson condensed version of safe food preservation classes, driven by participants' interest to meet the needs of everyday home preservers. A post-test survey revealed that participants took the course to be self-reliant, use their own produce, and be in control of…

  4. 78 FR 55251 - Southeast Supply Header, LLC; Notice of Request Under Blanket Authorization

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-10

    ... Supply Header, LLC; Notice of Request Under Blanket Authorization Take notice that on August 23, 2013, Southeast Supply Header, LLC (SESH), P.O. Box 1642, Houston, Texas 77251-1642, filed in Docket No. CP13-537... Southeast Supply Header, LLC et al, 119 FERC ] 61,153 (2007). SESH proposes to offset and replace...

  5. 76 FR 52028 - Self-Regulatory Organizations; New York Stock Exchange LLC; Notice of Filing and Immediate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-19

    ... individual stock trading pause pursuant to the Pause Pilot on the primary listing market and those..., The NASDAQ Stock Market LLC, New York Stock Exchange LLC, NYSE Amex LLC, NYSE Arca, Inc., National...-Regulatory Organizations; New York Stock Exchange LLC; Notice of Filing and Immediate Effectiveness of...

  6. 75 FR 61467 - Desert Southwest Power, LLC; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-54-000] Desert Southwest Power, LLC; Notice of Filing September 27, 2010. Take notice that on September 24, 2010, Desert Southwest Power, LLC (Desert Southwest) supplemented the responses filed on September 10, 2010 with...

  7. 75 FR 57761 - Desert Southwest Power, LLC; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-54-000] Desert Southwest Power, LLC; Notice of Filing September 14, 2010. Take notice that on September 10, 2010, Desert Southwest Power, LLC (Desert Southwest) filed responses to the Federal Energy Regulatory Commission's...

  8. 78 FR 39721 - Constitution Pipeline Company, LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-02

    ...] Constitution Pipeline Company, LLC; Notice of Application Take notice that on June 13, 2013, Constitution Pipeline Company, LLC (Constitution), having its principal place of business at 2800 Post Oak Boulevard..., Chenango, Delaware, and Schoharie Counties, New York.\\1\\ Constitution further requests that the Commission...

  9. 78 FR 17392 - Idaho Power Company; Notice of Availability of Final Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 1975-102; 2061-086] Idaho Power Company; Notice of Availability of Final Environmental Assessment In accordance with the National... Counties, Idaho. Both projects occupy lands managed by the Bureau of Land Management. The Lower Salmon...

  10. 77 FR 39695 - Idaho Power Company; Notice of Availability of Draft Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 1975-102 and 2061-086] Idaho Power Company; Notice of Availability of Draft Environmental Assessment In accordance with the... Falls, and Elmore Counties, Idaho. Both projects occupy lands managed by the Bureau of Land Management...

  11. Field Review of Fish Habitat Improvement Projects in Central Idaho.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beschta, Robert L.; Griffith, Jack; Wesche, Thomas A.

    1993-05-01

    The goal of this field review was to provide information to the Bonneville Power Administration (BPA) regarding previous and ongoing fish habitat improvement projects in central Idaho. On July 14, 1992, the review team met at the Sawtooth National Recreation Area office near Ketchum, Idaho, for a slide presentation illustrating several habitat projects during their construction phases. Following the slide presentation, the review team inspected fish habitat projects that have been implemented in the last several years in the Stanley Basin and adjacent valleys. At each site the habitat project was described to the field team and a brief periodmore » for project inspection followed. The review team visited approximately a dozen sites on the Challis, Sawtooth, and Boise National Forests over a period of approximately two and a half days. There are two objectives of this review namely to summarize observations for specific field sites and to provide overview commentary regarding the BPA habitat improvement program in central Idaho.« less

  12. Environmental resource document for the Idaho National Engineering Laboratory. Volume 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Irving, J.S.

    This document contains information related to the environmental characterization of the Idaho National Engineering Laboratory (INEL). The INEL is a major US Department of Energy facility in southeastern Idaho dedicated to nuclear research, waste management, environmental restoration, and other activities related to the development of technology. Environmental information covered in this document includes land, air, water, and ecological resources; socioeconomic characteristics and land use; and cultural, aesthetic, and scenic resources.

  13. Idaho Adopted Higher Standards to Prepare All Students for College and Careers

    ERIC Educational Resources Information Center

    Willits, Luci

    2014-01-01

    Two years ago the state officially chose to adopt the Common Core State Standards (CCSS) as Idaho's new Core Standards in mathematics and English language arts. For Idaho's students these standards are not only higher but also comparable with those in any other country in the world. These new standards will bring significant changes for Idaho…

  14. CAES 2014 Chemical Analyses of Thermal Wells and Springs in Southeastern Idaho

    DOE Data Explorer

    Baum, Jeffrey

    2014-03-10

    This dataset contains chemical analyses for thermal wells and springs in Southeastern Idaho. Data includes all major cations, major anions, pH, collection temperature, and some trace metals, These samples were collected in 2014 by the Center for Advanced Energy Studies (CAES), and are part of a continuous effort to analyze the geothermal potential of Southeastern Idaho.

  15. 75 FR 41524 - Horton Manufacturing Company, LLC, Tallmadge, OH; Amended Certification Regarding Eligibility To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-16

    ... employees of Horton Manufacturing Company, LLC and were not employees of either Wildcomm-Horton Partners... Company, LLC, Tallmadge, OH; Amended Certification Regarding Eligibility To Apply for Worker Adjustment... 11, 2010, applicable to workers of Horton Archery, LLC, formerly known as Wildcomm-Horton Partners...

  16. 75 FR 32221 - Alticor, Inc., Including Access Business Group International, LLC, and Amway Corporation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-07

    ... Access Business Group International, LLC, and Amway Corporation, Including On-Site Leased Workers from... Business Group International, LLC and Amway Corporation. The notice was published in the Federal Register... International, LLC and Amway Corporation. The Department has determined that these workers were sufficiently...

  17. 75 FR 4547 - High Island Offshore System, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-28

    ... Offshore System, L.L.C.; Notice of Application January 21, 2010. Take notice that on January 12, 2010, High Island Offshore System, L.L.C. (HIOS), 1100 Louisiana St., Houston, Texas 77002, filed in Docket No. CP10... directed to Jeff Molinaro, High Island Offshore System, L.L.C., 1100 Louisiana St., Houston, Texas 77002...

  18. 76 FR 79673 - Tennessee Gas Pipeline Company, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ... Pipeline Company, L.L.C.; Notice of Application On December 9, 2011, Tennessee Gas Pipeline Company, L.L.C... (Commission) an application under section 7(c) of the Natural Gas Act (NGA), as amended, and part 157 of the... Rocan, Senior Counsel, Tennessee Gas Pipeline Company, L.L.C., 1001 Louisiana Street, Houston, Texas...

  19. Development of consistent hazard controls for DOE transuranic waste operations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Woody, W.J.

    2007-07-01

    This paper describes the results of a re-engineering initiative undertaken with the Department of Energy's (DOE) Office of Environmental Management (EM) in order to standardize hazard analysis assumptions and methods and resulting safety controls applied to multiple transuranic (TRU) waste operations located across the United States. A wide range of safety controls are historically applied to transuranic waste operations, in spite of the fact that these operations have similar operational characteristics and hazard/accident potential. The re-engineering effort supported the development of a DOE technical standard with specific safety controls designated for accidents postulated during waste container retrieval, staging/storage, venting, onsitemore » movements, and characterization activities. Controls cover preventive and mitigative measures; include both hardware and specific administrative controls; and provide protection to the facility worker, onsite co-located workers and the general public located outside of facility boundaries. The Standard development involved participation from all major DOE sites conducting TRU waste operations. Both safety analysts and operations personnel contributed to the re-engineering effort. Acknowledgment is given in particular to the following individuals who formed a core working group: Brenda Hawks, (DOE Oak Ridge Office), Patrice McEahern (CWI-Idaho), Jofu Mishima (Consultant), Louis Restrepo (Omicron), Jay Mullis (DOE-ORO), Mike Hitchler (WSMS), John Menna (WSMS), Jackie East (WSMS), Terry Foppe (CTAC), Carla Mewhinney (WIPP-SNL), Stephie Jennings (WIPP-LANL), Michael Mikolanis (DOESRS), Kraig Wendt (BBWI-Idaho), Lee Roberts (Fluor Hanford), and Jim Blankenhorn (WSRC). Additional acknowledgment is given to Dae Chung (EM) and Ines Triay (EM) for leadership and management of the re-engineering effort. (authors)« less

  20. 78 FR 56685 - SourceGas Distribution LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP13-540-000] SourceGas Distribution LLC; Notice of Application Take notice that on August 27, 2013, SourceGas Distribution LLC (Source... areas across the Nebraska-Colorado border within which SourceGas may, without further commission...

  1. 77 FR 55468 - Oliver Hydro LLC; Notice Soliciting Scoping Comments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13005-003] Oliver Hydro LLC; Notice Soliciting Scoping Comments Take notice that the following hydroelectric application has been... License. b. Project No.: P-13005-003. c. Date filed: December 14, 2011. d. Applicant: Oliver Hydro LLC. e...

  2. 76 FR 47576 - DCP Intrastate Network, LLC; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR11-120-000] DCP Intrastate Network, LLC; Notice of Filing Take notice that on July 26, 2011, DCP Intrastate Network, LLC filed to provide notice of its cancellation of its Statement of Operating Conditions for Interstate Gas...

  3. 77 FR 31840 - Perryville Gas Storage LLC; Notice of Amendment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12-460-000] Perryville Gas Storage LLC; Notice of Amendment Take notice that on May 11, 2012, Perryville Gas Storage LLC (Perryville), Three Riverway, Suite 1350, Houston, Texas 77056, filed in the above referenced docket an application...

  4. 76 FR 9359 - Notice of Proposed Withdrawal and Opportunity for Public Meeting; Idaho

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-17

    ... National Forest System land in the Idaho Panhandle National Forest from mining to protect the Settler's... requests should be sent to the Forest Supervisor, Idaho Panhandle National Forest, 3815 Schreiber Way... filed an application to withdraw the following described National Forest lands from location and entry...

  5. Hydrologic conditions at the Idaho National Engineering Laboratory, Idaho, emphasis; 1974-1978

    USGS Publications Warehouse

    Barraclough, Jack T.; Lewis, Barney D.; Jensen, Rodger G.

    1981-01-01

    Aqueous chemical and radioactive wastes have been discharged to shallow ponds and to shallow or deep wells on the Idaho National Engineering Laboratory (INEL) since 1952 and has affected the quality of the ground water in the underlying Snake River Plain aquifer. Ongoing studies conducted from 1974 through 1978 have shown the perpetuation of a perched ground-water zone in the basalt underlying the waste disposal ponds at the INEL 's Test Reactor Area and of several waste plumes in the regional aquifer created by deep well disposal at the Idaho Chemical Processing Plant (ICPP). The perched zone contains tritium, chromium-51, cobalt-60, strontium-90, and several nonradioactive chemicals. Tritium has formed the largest waste plume south of the ICPP, and accounts for 95 percent of the total radioacticity disposed of through the ICPP disposal well. Waste plumes with similar configurations and flowpaths contain sodium, chloride, and nitrate. Strontium-90, iodine-129, and cesium-137 are also discharged through the well but they are sorbed from solution as they move through the aquifer or are discharged in very small quantities. Strontium-90 and iodine-129 have formed small waste plumes and cesium-137 is not detectable in ground-water samples. Radionuclide plume size and concentrations therein are controlled by aquifer flow conditions, the quantity discharged, radioactive decay, sorption, dilution by dispersion, and perhaps other chemical reactions. Chemical wastes are subject to the same processes except for radioactive decay. (USGS)

  6. 76 FR 35200 - High Island Offshore System, L.L.C.; Notice of Amendment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-16

    ... Offshore System, L.L.C.; Notice of Amendment Take notice that on June 6, 2011, High Island Offshore System, L.L.C. (HIOS), 1100 Louisiana St., Houston, Texas 77002, filed in Docket No. CP10-43-001, to amend... System, L.L.C., 1100 Louisiana St., Houston, Texas 77002, or (telephone) 713-381-2526, or [email protected

  7. 77 FR 10505 - Notice of Attendance at PJM Interconnection, L.L.C. Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-22

    ... Interconnection, L.L.C. Meetings The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of the Commission and Commission staff may attend upcoming PJM Interconnection, L.L.C. (PJM..., PJM Interconnection, L.L.C. Docket Nos. ER06-456, ER06-880, ER06-954, ER06-1271, EL07-57, ER07-424...

  8. Evaluation of seepage and discharge uncertainty in the middle Snake River, southwestern Idaho

    USGS Publications Warehouse

    Wood, Molly S.; Williams, Marshall L.; Evetts, David M.; Vidmar, Peter J.

    2014-01-01

    The U.S. Geological Survey, in cooperation with the State of Idaho, Idaho Power Company, and the Idaho Department of Water Resources, evaluated seasonal seepage gains and losses in selected reaches of the middle Snake River, Idaho, during November 2012 and July 2013, and uncertainty in measured and computed discharge at four Idaho Power Company streamgages. Results from this investigation will be used by resource managers in developing a protocol to calculate and report Adjusted Average Daily Flow at the Idaho Power Company streamgage on the Snake River below Swan Falls Dam, near Murphy, Idaho, which is the measurement point for distributing water to owners of hydropower and minimum flow water rights in the middle Snake River. The evaluated reaches of the Snake River were from King Hill to Murphy, Idaho, for the seepage studies and downstream of Lower Salmon Falls Dam to Murphy, Idaho, for evaluations of discharge uncertainty. Computed seepage was greater than cumulative measurement uncertainty for subreaches along the middle Snake River during November 2012, the non-irrigation season, but not during July 2013, the irrigation season. During the November 2012 seepage study, the subreach between King Hill and C J Strike Dam had a meaningful (greater than cumulative measurement uncertainty) seepage gain of 415 cubic feet per second (ft3/s), and the subreach between Loveridge Bridge and C J Strike Dam had a meaningful seepage gain of 217 ft3/s. The meaningful seepage gain measured in the November 2012 seepage study was expected on the basis of several small seeps and springs present along the subreach, regional groundwater table contour maps, and results of regional groundwater flow model simulations. Computed seepage along the subreach from C J Strike Dam to Murphy was less than cumulative measurement uncertainty during November 2012 and July 2013; therefore, seepage cannot be quantified with certainty along this subreach. For the uncertainty evaluation, average

  9. CaLRS: A Critical-Aware Shared LLC Request Scheduling Algorithm on GPGPU

    PubMed Central

    Ma, Jianliang; Meng, Jinglei; Chen, Tianzhou; Wu, Minghui

    2015-01-01

    Ultra high thread-level parallelism in modern GPUs usually introduces numerous memory requests simultaneously. So there are always plenty of memory requests waiting at each bank of the shared LLC (L2 in this paper) and global memory. For global memory, various schedulers have already been developed to adjust the request sequence. But we find few work has ever focused on the service sequence on the shared LLC. We measured that a big number of GPU applications always queue at LLC bank for services, which provide opportunity to optimize the service order on LLC. Through adjusting the GPU memory request service order, we can improve the schedulability of SM. So we proposed a critical-aware shared LLC request scheduling algorithm (CaLRS) in this paper. The priority representative of memory request is critical for CaLRS. We use the number of memory requests that originate from the same warp but have not been serviced when they arrive at the shared LLC bank to represent the criticality of each warp. Experiments show that the proposed scheme can boost the SM schedulability effectively by promoting the scheduling priority of the memory requests with high criticality and improves the performance of GPU indirectly. PMID:25729772

  10. 75 FR 8052 - Stetson Wind II, LLC; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Docket No. ER10-426-001] Stetson Wind II, LLC; Notice of Filing February 12, 2010. Take notice that, on February 5, 2010, Stetson Wind II, LLC filed to amend, its filing in the above captioned docket with information required under the...

  11. 75 FR 67352 - Liberty Natural Gas, LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-02

    ... Gas, LLC; Notice of Application October 26, 2010. On October 14, 2010, Liberty Natural Gas, LLC... of the Natural Gas Act and section 157 of the Commission's Regulations requesting: (1) A certificate of public convenience and necessity to construct and operate a 9.2-mile natural gas pipeline and...

  12. 76 FR 9012 - DCP Intrastate Network, LLC; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR11-85-000] DCP Intrastate Network, LLC; Notice of Filing Take notice that on February 1, 2011, DCP Intrastate Network, LLC (DCPIN) filed to provide notice of its withdrawal of rates for transportation service under Section 311 of the...

  13. 77 FR 10490 - Arcadia Gas Storage, LLC; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR12-12-001] Arcadia Gas Storage, LLC; Notice of Filing Take notice that on February 13, 2012, Arcadia Gas Storage, LLC filed a revised Statement of Operating Conditions to further define the priority of service of its proposed...

  14. 77 FR 6107 - Arcadia Gas Storage, LLC; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR12-12-000] Arcadia Gas Storage, LLC; Notice of Filing Take notice that on January 30, 2012, Arcadia Gas Storage, LLC filed a Statement of Operating Conditions to set forth the addition of its Enhanced Authorized Overrun Service. Any...

  15. 75 FR 57011 - Tallulah Gas Storage LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ... Storage LLC; Notice of Application September 9, 2010. Take notice that on August 31, 2010, Tallulah Gas Storage LLC (Tallulah), 10370 Richmond Avenue, Suite 510, Houston, TX 77042, filed in Docket No. CP10-494... necessity authorizing Tallulah to construct and operate a natural gas storage facility and pipeline...

  16. 75 FR 17707 - Arlington Storage Company, LLC; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-07

    ... Storage Company, LLC; Notice of Filing March 30, 2010. Take notice that on March 24, 2010, Arlington Storage Company, LLC (ASC), Two Brush Creek Boulevard, Kansas City, Missouri 64112, filed an application... existing underground natural gas storage facility located in Schuyler County, New York known as the Seneca...

  17. 76 FR 22092 - Perryville Gas Storage LLC; Notice of Amendment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP11-159-000] Perryville Gas Storage LLC; Notice of Amendment Take notice that on March 30, 2011, Perryville Gas Storage LLC... granted authorization to charge market-based rates for its storage and hub services, as well as the...

  18. 77 FR 74838 - Perryville Gas Storage LLC; Notice of Amendment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-18

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP13-23-000] Perryville Gas Storage LLC; Notice of Amendment Take notice that on December 3, 2012, Perryville Gas Storage LLC... the approved storage cavern wells (Cavern Well PGS- 2) approximately 400 feet, all as more fully set...

  19. 75 FR 38801 - PELICO Pipeline, LLC; Notice of Baseline Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR10-41-000] PELICO Pipeline, LLC; Notice of Baseline Filing June 28, 2010. Take notice that on June 22, 2010, PELICO Pipeline, LLC submitted a baseline filing of its Statement of Operating Conditions for services provided under section 311...

  20. 75 FR 38799 - ETC Tiger Pipeline, LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP10-459-000] ETC Tiger Pipeline, LLC; Notice of Application June 25, 2010. Take notice that on June 15, 2010, ETC Tiger Pipeline, LLC (ETC Tiger), 711 Louisiana Street, Suite 900, Houston, Texas 77002, filed an application in Docket...

  1. 78 FR 13659 - Sierrita Gas Pipeline LLC; Notice OF Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-28

    ... (Sierrita), P.O. Box 1087, Colorado Springs, Colorado 80944, filed in the above referenced docket an... directed to Mr. Francisco Tarin, Director, Regulatory Affairs, Sierrita Gas Pipeline LLC, P.O. Box 1087... or David K. Dewey, Associate Counsel, Sierrita Gas Pipeline LLC, P.O. Box 1087, Colorado Springs...

  2. 77 FR 58371 - Discovery Gas Transmission LLC; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP12-516-000] Discovery Gas Transmission LLC; Notice of Application Take notice that on September 7, 2012, Discovery Gas Transmission LLC (Discovery), 2800 Post Oak Boulevard, Houston, Texas 77056, filed in Docket No. CP12-516-000 an application...

  3. 78 FR 63394 - Approval and Promulgation of Implementation Plans; Idaho: State Board Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R10-OAR-2013-0548, FRL-9901-76-Region 10] Approval and Promulgation of Implementation Plans; Idaho: State Board Requirements AGENCY: Environmental..., dated June 26, 2013, and Idaho Code Sec. Sec. 59-701 through 705, Ethics in Government Act, and...

  4. Idaho Dance Project. Creative Movement/Dance: A Model Program for Idaho K-6 Elementary Teachers 1990-1993.

    ERIC Educational Resources Information Center

    Neely, Hilarie

    This report outlines and evaluates the Idaho Dance Project, a series of creative movement workshops designed for elementary school classroom teachers, physical education teachers, and music specialists. For three years, the workshops, conducted at various sites throughout the state, provided an introductory course for teachers who had little or no…

  5. A Survey of Idaho's Private Schools

    ERIC Educational Resources Information Center

    Catt, Andrew D.

    2014-01-01

    In this memo, we synthesize information collected recently in two private school surveys, one conducted by the U.S. Department of Education and another by the Friedman Foundation and the Idaho Federation of Independent Schools (IDFIS). After a brief description of the data sources, we present the key survey findings in two sections.

  6. Soil gas studies along the Trans-Challis fault system near Idaho City, Boise County, Idaho

    USGS Publications Warehouse

    McCarthy, J.H.; Kiilsgaard, T.H.

    2001-01-01

    Soil gases were sampled along several traverses that cross the Trans-Challis fault system in central Idaho. Anomalous carbon dioxide, hydrogen, oxygen, hydrocarbon, and sulfur gas concentrations coincide with faults and known mineralized areas. Anomalies in areas not known to be mineralized may reflect undiscovered mineral deposits or concealed faults. Soil gases may be a useful exploration guide for mineral deposits in this terrane.

  7. Rare Earth Element and Trace Element Data Associated with Hydrothermal Spring Reservoir Rock, Idaho

    DOE Data Explorer

    Quillinan, Scott; Bagdonas, Davin

    2017-06-22

    These data represent rock samples collected in Idaho that correspond with naturally occurring hydrothermal samples that were collected and analyzed by INL (Idaho Falls, ID). Representative samples of type rocks were selected to best represent the various regions of Idaho in which naturally occurring hydrothermal waters occur. This includes the Snake River Plain (SRP), Basin and Range type structures east of the SRP, and large scale/deep seated orogenic uplift of the Sawtooth Mountains, ID. Analysis includes ICP-OES and ICP-MS methods for Major, Trace, and REE concentrations.

  8. PDG Construction, LLC Information Sheet

    EPA Pesticide Factsheets

    PDG Construction, LLC d/b/a Princeton Design Guild (the Company) is located in Bell Meade, New Jersey. The settlement involves renovation activities conducted at property constructed prior to 1978, located in Hopewell, New Jersey.

  9. 76 FR 18747 - Teton Power Funding, LLC; Topsham Hydro Partners Limited Partnership; Topsham Hydroelectric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    .... Topsham Hydro Partners Limited Partnership: Christine M. Miller, Brown Bear GP, LLC, c/o ArcLight Capital.... Miller, Brown Bear Power, LLC, c/o ArcLight Capital Partners, LLC, 200 Clarendon Street, 55th Floor.... Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426...

  10. 78 FR 69134 - Manufacturer of Controlled Substances; Notice of Registration: AMPAC Fine Chemicals, LLC.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-18

    ...; Notice of Registration: AMPAC Fine Chemicals, LLC. By Notice dated July 23, 2013, and published in the Federal Register on July 31, 2013, 78 FR 46372, AMPAC Fine Chemicals, LLC., Highway 50 and Hazel Avenue... AMPAC Fine Chemicals, LLC., to manufacture the listed basic classes of controlled substances is...

  11. Radiochemical and chemical constituents in water from selected wells and springs from the southern boundary of the Idaho National Laboratory to the Hagerman Area, Idaho, 2003

    USGS Publications Warehouse

    Rattray, Gordon W.; Wehnke, Amy J.; Hall, L. Flint; Campbell, Linford J.

    2005-01-01

    The U.S. Geological Survey and the Idaho Department of Water Resources, in cooperation with the U.S. Department of Energy, sampled water from 14 sites as part of an ongoing study to monitor the water quality of the eastern Snake River Plain aquifer between the southern boundary of the Idaho National Laboratory (INL) and the Burley-Twin Falls-Hagerman area. The State of Idaho, Department of Environmental Quality, Division of INL Oversight and Radiation Control cosampled with the U.S. Geological Survey and the Idaho Department of Water Resources and their analytical results are included in this report. The samples were collected from four domestic wells, two dairy wells, two springs, four irrigation wells, one observation well, and one stock well and analyzed for selected radiochemical and chemical constituents. Two quality-assurance samples, sequential replicates, also were collected and analyzed. None of the concentrations of radiochemical or organic-chemical constituents exceeded the maximum contaminant levels for drinking water established by the U.S. Environmental Protection Agency. However, the concentration of one inorganic-chemical constituent, nitrate (as nitrogen), in water from site MV-43 was 20 milligrams per liter which exceeded the maximum contaminant level for that constituent. Of the radiochemical and chemical concentrations analyzed for in the replicate-sample pairs, 267 of the 270 pairs (with 95 percent confidence) were statistically equivalent.

  12. Ecological adaptations in Douglas-fir (Pseudotsuga menziesii var. glauca) populations. III. Central Idaho

    Treesearch

    Gerald E. Rehfeldt

    1983-01-01

    Rehfeldt, Gerald E. 1983. Ecological adaptations in Douglas-fir (Pseudotsuga menziesii var. glauca) populations. III. Central Idaho. Canadian Journal of Forest Research. 13: 626-632. Growth, phenology, and cold hardiness of seedlings from 74 populations of Douglas-fir (Pseudotsuga menziesii var. glauca (Beissn.) Franco) from central Idaho were compared in four...

  13. 36 CFR 294.24 - Timber cutting, sale, or removal in Idaho Roadless Areas.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... removal in Idaho Roadless Areas. (a) Wild Land Recreation. The cutting, sale, or removal of timber is prohibited in Idaho Roadless Areas designated as Wild Land Recreation under this subpart, except: (1) For... processes; (iii) To reduce the risk of uncharacteristic wildland fire effects to an at-risk community or...

  14. 36 CFR 294.24 - Timber cutting, sale, or removal in Idaho Roadless Areas.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... removal in Idaho Roadless Areas. (a) Wild Land Recreation. The cutting, sale, or removal of timber is prohibited in Idaho Roadless Areas designated as Wild Land Recreation under this subpart, except: (1) For... processes; (iii) To reduce the risk of uncharacteristic wildland fire effects to an at-risk community or...

  15. 36 CFR 294.24 - Timber cutting, sale, or removal in Idaho Roadless Areas.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... removal in Idaho Roadless Areas. (a) Wild Land Recreation. The cutting, sale, or removal of timber is prohibited in Idaho Roadless Areas designated as Wild Land Recreation under this subpart, except: (1) For... processes; (iii) To reduce the risk of uncharacteristic wildland fire effects to an at-risk community or...

  16. 36 CFR 294.24 - Timber cutting, sale, or removal in Idaho Roadless Areas.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... removal in Idaho Roadless Areas. (a) Wild Land Recreation. The cutting, sale, or removal of timber is prohibited in Idaho Roadless Areas designated as Wild Land Recreation under this subpart, except: (1) For... processes; (iii) To reduce the risk of uncharacteristic wildland fire effects to an at-risk community or...

  17. 75 FR 17406 - Stetson Wind II, LLC; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER10-426-000] Stetson Wind II, LLC; Notice of Filing March 31, 2010. Take notice that, on March 29, 2010, Stetson Wind II, LLC filed a supplement to its filing in the above captioned docket with information required under the...

  18. 75 FR 70727 - Perryville Gas Storage LLC ; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-18

    ... Storage LLC ; Notice of Application November 10, 2010. Take notice that on November 5, 2010, Perryville Gas Storage LLC (Perryville), Three Riverway, Suite 1350, Houston, Texas 77056, filed in Docket No... interpretations for the location of the edge of the salt dome relative to the approved natural gas storage Cavern...

  19. 75 FR 45610 - Liberty Gas Storage LLC; Notice of Amendment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-03

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. CP05-92-007] Liberty Gas Storage LLC; Notice of Amendment Take notice that on July 26, Liberty Gas Storage LLC (``Liberty''), 101... Gas Storage, 101 Ash Street, San Diego, CA 92101, phone (619) 699-5050. The filing is available for...

  20. 75 FR 37786 - Crosstex LIG, LLC; Notice of Baseline Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR10-40-000] Crosstex LIG, LLC; Notice of Baseline Filing June 23, 2010. Take notice that on June 21, 2010, Crosstex LIG, LLC submitted a baseline filing of its FERC Operating Statement for services provided under Section 311 of the...