Sample records for ii draft interim

  1. Antimicrobial Exposure Assessment Task Force II (AEATF II) Volume 5: Governing Document for a Multi-Year Antimicrobial Chemical Exposure Monitoring Program (interim draft document)

    EPA Pesticide Factsheets

    Describes the overall scope of the AEATF II program, demonstrates the need for additional human exposure monitoring data and explains the proposed methodology for the exposure monitoring studies proposed for conduct by the AEATF II.

  2. Antimicrobial Exposure Assessment Task Force II (AEATF II) Volume 5: Governing Document for a Multi-Year Antimicrobial Chemical Exposure Monitoring Program (interim draft document with changes)

    EPA Pesticide Factsheets

    This document describes the overall scope of the AEATF II program, demonstrates the need for additional human exposure monitoring data and explains the proposed methodology for the exposure monitoring studies proposed for conduct by the AEATF II.

  3. 75 FR 984 - Draft Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-07

    ... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites AGENCY... Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response... interim PRGs for dioxin in soil. These draft recommended interim PRGs were calculated using existing, peer...

  4. 78 FR 40199 - Draft Spent Fuel Storage and Transportation Interim Staff Guidance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-03

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0140] Draft Spent Fuel Storage and Transportation Interim... Spent Fuel Storage and Transportation Interim Staff Guidance No. 24 (SFST-ISG-24), Revision 0, ``The Use of a Demonstration Program as Confirmation of Integrity for Continued Storage of High Burnup Fuel...

  5. 78 FR 72897 - Draft Guidance for Industry on Interim Product Reporting for Human Drug Compounding Outsourcing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-04

    ...] Draft Guidance for Industry on Interim Product Reporting for Human Drug Compounding Outsourcing... Compounding Outsourcing Facilities Under Section 503B of the Federal Food, Drug, and Cosmetic Act.'' The draft... human drug compounders that choose to register as outsourcing facilities (outsourcing facilities). DATES...

  6. 76 FR 58311 - Draft License Renewal Interim Staff Guidance LR-ISG-2011-05; Ongoing Review of Operating Experience

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-20

    ... nuclear power plants. In response to a request from the Nuclear Energy Institute (NEI), the NRC is... NUCLEAR REGULATORY COMMISSION [NRC-2011-0191] Draft License Renewal Interim Staff Guidance LR-ISG-2011-05; Ongoing Review of Operating Experience AGENCY: Nuclear Regulatory Commission. ACTION: Draft...

  7. Home Start Evaluation Study. Interim Report II: Program Analysis. Revised Draft.

    ERIC Educational Resources Information Center

    Deloria, Dennis; And Others

    This document is the second in a series of evaluative reports directed to evaluation needs of Home Start planners and administrators. It focuses on implementation data about programs gathered during local site visits conducted in the spring and fall of 1972. The two basic evaluative questions asked are: (1) What was Home Start intended by its…

  8. 76 FR 60937 - Draft License Renewal Interim Staff Guidance LR-ISG-2011-02; Aging Management Program for Steam...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ...-2011-02; Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION... License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-02, ``Aging Management Program for Steam... using Revision 3 of NEI 97-06 to manage steam generator aging. The Draft LR-ISG revises the NRC staff's...

  9. 78 FR 5830 - Draft Environmental Assessment and Proposed Habitat Conservation Plan for the Interim Operations...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ... Operations of PacifiCorp's Klamath Hydroelectric Project on the Klamath River, Klamath County, OR, and... Environmental Policy Act (NEPA) for the interim operations of the Klamath Hydroelectric Project in [[Page 5831... habitats upon which they depend, resulting from the interim operations of the Klamath Hydroelectric Project...

  10. Proceedings of the Joint Logistics Commanders Joint Policy Coordinating Group on Computer Resource Management; Computer Software Management Software Workshop, 2-5 April 1979.

    DTIC Science & Technology

    1979-08-21

    Appendix s - Outline and Draft Material for Proposed Triservice Interim Guideline on Application of Software Acceptance Criteria....... 269 Appendix 9...AND DRAFT MATERIAL FOR PROPOSED TRISERVICE INTERIM GUIDELINE ON APPLICATION OF SOFTWARE ACCEPTANCE CRITERIA I I INTRODUCTION The purpose of this guide...contract item (CPCI) (code) 5. CPCI test plan 6. CPCI test procedures 7. CPCI test report 8. Handbooks and manuals. Al though additional material does

  11. 76 FR 11506 - Fisheries and Habitat Conservation and Migratory Birds Programs; Draft Land-Based Wind Energy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-02

    ...] RIN 1018-AX45 Fisheries and Habitat Conservation and Migratory Birds Programs; Draft Land-Based Wind... Register on February 18, 2011, announcing the availability for public comment of draft Land-Based Wind... Guidelines are intended to supersede the Service's 2003 voluntary, interim guidelines for land-based wind...

  12. EPA Releases Draft Policy to Reduce Animal Testing for Skin Sensitization

    EPA Pesticide Factsheets

    The document, Draft Interim Science Policy: Use of Alternative Approaches for Skin Sensitization as a Replacement for Laboratory Animal Testing, describes the science behind the non-animal alternatives that can now be used to identify skin sensitization.

  13. 75 FR 43528 - Seeking Public Comment on Draft National Health Security Strategy Biennial Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-26

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Office of the Secretary Seeking Public Comment on Draft National Health Security Strategy Biennial Implementation Plan AGENCY: Department of Health and Human... Interim Implementation Guide for the National Health Security Strategy of the United States of America...

  14. Draft Reformulation. Phase I. General Design Memorandum and Draft Environmental Impact Statement: Geneva-on-the-Lake, Ohio Small Boat Harbor. Revision.

    DTIC Science & Technology

    1981-04-01

    east of Arcola Creek. The Interim Report gave a favorable recommendation for the harbor project and the results were published in House Document No. 91...Draft Reformulation Phase I GDM Re]port (Draft Stage 3 Report) The purpi se of this )rf t Stag. 3 Report Is to present the results of the Stage 3...Iirements for a small-boat harbor at Geneva State Park. Results of the bathymetric survey and sediment sampling program are presented in Appendix A. (3

  15. Environmental Quality Technology Demonstration, Evaluation and Transfer Activities

    DTIC Science & Technology

    1996-12-02

    and Appropriate Requirements) and ARAR support documentation for interim and final Installation Restoration Program (IRP) remedial actions . During the...Relevant and Appropriate Requirements (ARARs) for Fort Devens , Massachusetts. Delivered Federal Environmental Legislative Power Curve in hard copy and... Remedial Actions . Delivered revised tables for Desk Guide on Interpretation of Applicable or Relevant and Appropriate Requirements — Interim Draft

  16. 76 FR 52995 - Draft License Renewal Interim Staff Guidance LR-ISG-2011-05: Ongoing Review of Operating...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-24

    ...- 2011-0191. Address questions about NRC dockets to Carol Gallagher, telephone: 301-492-3668; e-mail...): Publicly available documents created or received at the NRC are available online in the NRC Library at http...-800-397-4209, 301-415-4737, or by e-mail to [email protected] . The draft LR-ISG proposes to revise...

  17. An Interim Report on NASA's Draft Space Technology Roadmaps

    NASA Technical Reports Server (NTRS)

    2011-01-01

    NASA has developed a set of 14 draft roadmaps to guide the development of space technologies under the leadership of the NASA Office of the Chief Technologist (OCT). Each of these roadmaps focuses on a particular technology area (TA). The roadmaps are intended to foster the development of advanced technologies and concepts that address NASA's needs and contribute to other aerospace and national needs. OCT requested that the National Research Council conduct a study to review the draft roadmaps, gather and assess relevant community input, and make recommendations and suggest priorities to inform NASA's decisions as it finalizes its roadmaps. The statement of task states that "based on the results of the community input and its own deliberations, the steering committee will prepare a brief interim report that addresses high-level issues associated with the roadmaps, such as the advisability of modifying the number or technical focus of the draft NASA roadmaps." This interim report, which does not include formal recommendations, addresses that one element of the study charge. NASA requested this interim report so that it would have the opportunity to make an early start in modifying the draft roadmaps based on feedback from the panels and steering committee. The final report will address all other tasks in the statement of task. In particular, the final report will include a prioritization of technologies, will describe in detail the prioritization process and criteria, and will include specific recommendations on a variety of topics, including many of the topics mentioned in this interim report. In developing both this interim report and the final report to come, the steering committee draws on the work of six study panels organized by technical area, loosely following the organization of the 14 roadmaps, as follows: A Panel 1: Propulsion and Power TA01 Launch Propulsion Systems TA02 In-Space Propulsion Technologies TA03 Space Power and Energy Storage Systems TA13 Ground and Launch Systems Processing B Panel 2: Robotics, Communications, and Navigation TA04 Robotics, TeleRobotics, and Autonomous Systems TA05 Communication and Navigation Systems C Panel 3: Instruments and Computing TA08 Science Instruments, Observatories, and Sensor Systems TA11 Modeling, Simulation, Information Technology, and Data Processing D Panel 4: Human Health and Surface Exploration TA06 Human Health, Life Support, and Habitation Systems TA07 Human Exploration Destination Systems E Panel 5: Materials Panel TA10 Nanotechnology TA12 Materials, Structures, Mechanical Systems, and Manufacturing TA14 Thermal Management Systems F Panel 6: Entry, Descent, and Landing Panel TA09 Entry, Descent, and Landing Systems In addition to drawing on the expertise represented on the steering committee and panels, the committee obtained input from each of 14 public workshops held on each of the 14 roadmaps. At these 1-day workshops, invited speakers, guests, and members of the public engaged in discussions on the different technology areas and their value to NASA. Broad community input was also solicited from a public website, where more than 240 public comments were received on the draft roadmaps in response to application of criteria (such as benefit, risk and reasonableness, and alignment with NASA and national goals) that the steering committee established. This interim report reflects the results of deliberations by the steering committee in light of these public inputs as well as additional inputs from the six panels. The steering committee's final report will be completed early in 2012. That report will prioritize the technologies that span the entire scope of the 14 roadmaps and provide additional guidance on crosscutting themes and other relevant topics.

  18. Meeting Materials from the 5th ESA Workshop

    EPA Pesticide Factsheets

    EPA and its federal partners, Fish and Wildlife Service and National Marine Fisheries Service, held a meeting for stakeholder suggestions for refining some of the interim scientific methods used in the recently released draft.

  19. Opening Plenary Presentations from the Agencies at the 5th ESA Workshop

    EPA Pesticide Factsheets

    EPA and its federal partner held a two-day meeting that provided a forum for stakeholder suggestions for refining some of the interim scientific methods used in the recently released draft Biological Evaluations for three pilot chemicals

  20. Closing Plenary Reports from Breakout Groups at the 5th ESA Workshop

    EPA Pesticide Factsheets

    EPA and its federal partner held a two-day meeting that provided a forum for stakeholder suggestions for refining some of the interim scientific methods used in the recently released draft Biological Evaluations for three pilot chemicals

  1. Aeromedical Airlift -- Do the Pieces Fit?

    DTIC Science & Technology

    1988-01-01

    architecture analysis. feasibility study, and system design phase. To save money and time associated with unforeseen down-line modifications that may... loand Redietribution of Patients in CONUS. Draft Interim; Report No. IX-h. Maximnus, Inc., McLean Va.: Prepared for Office of the Assistant.Secretary of

  2. 77 FR 37058 - Draft Guidance for Industry and Food and Drug Administration Staff; Class II Special Controls...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-20

    ...] Draft Guidance for Industry and Food and Drug Administration Staff; Class II Special Controls Guidance... availability of the draft guidance entitled ``Class II Special Controls Guidance Document: Implanted Blood... blood access devices may comply with the requirement of special controls for class II devices. This...

  3. PRN 95-3: Reduction of Worker protection Standard (WPS) Interim Restricted Entry Intervals (REIS) for Certain Low Risk Pesticides

    EPA Pesticide Factsheets

    On January 11, 1995, EPA published a draft policy on Reduced Restricted Entry Intervals for Certain Pesticides, in the Federal Register. The final policy was published in the Federal Register on May 3, 1995. This Notice contains the final policy.

  4. 75 FR 62610 - Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS Subcommittee on Plant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-12

    ...: Draft Regulatory Guide DG-1237, ``Guidance on Making Changes to Emergency Plans for Nuclear Power Reactors,'' Interim Staff Guidance (ISG) NSIR/DPR-ISG-01, ``Emergency Planning for Nuclear Power Plants... NUCLEAR REGULATORY COMMISSION Advisory Committee on Reactor Safeguards (ACRS); Meeting of the ACRS...

  5. 78 FR 49735 - Intent To Prepare a Draft Environmental Impact Statement for Dam Safety Study, Lake Lewisville...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-15

    ... determine appropriate permanent methods for correcting potential problems, interim risk reduction measures... Environmental Impact Statement for Dam Safety Study, Lake Lewisville Dam, Elm Fork Trinity River, Denton County... primary purposes of the project are flood risk management, [[Page 49736

  6. 76 FR 74831 - Aging Management of Stainless Steel Structures and Components in Treated Borated Water

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... exposed to treated borated water. In response to a request from the Nuclear Energy Institute (NEI), the... NUCLEAR REGULATORY COMMISSION [NRC-2011-0256] Aging Management of Stainless Steel Structures and Components in Treated Borated Water AGENCY: Nuclear Regulatory Commission. ACTION: Draft interim staff...

  7. 78 FR 68101 - Environmental Issues Associated With New Reactors and Specific Environmental Guidance for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-13

    ... October 15, 2013. The Nuclear Energy Institute (NEI) submitted a letter on September 17, 2013 (Agencywide... NUCLEAR REGULATORY COMMISSION [NRC-2013-0212: NRC-2013-0211] Environmental Issues Associated With... AGENCY: Nuclear Regulatory Commission. ACTION: Draft interim staff guidance; re-opening of comment period...

  8. Articulated, Performance-Based Instruction Guide for Drafting II. Final Document. Revised.

    ERIC Educational Resources Information Center

    Henderson, William Edward, Jr.

    Developed during a project designed to provide continuous, performance-based vocational training at the secondary and postsecondary levels, this instructional guide is intended to help teachers implement a laterally and vertically articulated secondary level drafting II program. Introductory materials include a description of Drafting II,…

  9. The Archaeology of Coralville Lake, Iowa. Volume 4. Recreation Area Survey. (Interim Report 2).

    DTIC Science & Technology

    1985-09-01

    THE ARCHAEOLOGY OF CORALVILLE LAKE, IOWA VOLUME IV: RECREATION AREA SURVEY (INTERIM REPORT II) p - [ JAN 1 4 1986 WAUWATOSA. WISCONSIN 86 1.13 117...THE ARCHAEOLOGY OF CORALVILLE LAKE, IOWA ; VOLUME IV: RECREATION AREA SURVEY (INTERIM REPORT II) Submitted To: Rock Island District Corps of Engineers...presents the results of intensive archaeological and geomorphic investigations at 14 special use or recreation areas at Coralville Lake, Iowa . The

  10. 76 FR 35208 - Boott Hydropower, Inc.; Notice of Availability of Draft Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-16

    ... of the wooden flashboards with a pneumatic crest gate system of the same height and interim modifications to the existing flashboard system and concludes that authorizing the amendment, with appropriate... in the Public Reference Room, or it may be viewed on the Commission's Web site at http://www.ferc.gov...

  11. 75 FR 41872 - Advisory Commission on Childhood Vaccines; Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-19

    ... Commission on Childhood Vaccines; Notice of Meeting SUMMARY: In accordance with section 10(a)(2) of the... is hereby giving notice that the Advisory Commission on Childhood Vaccines (ACCV) will hold a special...: This is a special meeting of the ACCV. Discussions will surround the draft interim influenza vaccine...

  12. 76 FR 56507 - Availability of Information, Public Observation of Meetings, Procedure, Practice for Hearings...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-13

    ... to issue orders) with respect to the supervision of SLHCs and their non-depository subsidiaries... notice of intent also advised that the Board would issue an interim final rule to effectuate the... elimination of requirements in OTS rules for prefiling meetings and submission of draft business plans, and...

  13. 78 FR 49782 - Interim Staff Guidance on Changes During Construction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-15

    ... seven comments on the Draft ISG from the Nuclear Energy Institute (NEI) (ADAMS Accession No. ML12089A019... construction impacts evaluation and the 10 CFR 50.59- like review (including applicability determination..., the construction impacts evaluation and the 10 CFR 50.59 and 10 CFR 50-59-like evaluation (including...

  14. 76 FR 72006 - Draft Interim Staff Guidance: Evaluations of Uranium Recovery Facility Surveys of Radon and Radon...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    .... Discussion Uranium recovery facility licensees, including in-situ recovery facilities and conventional... Recovery Facility Surveys of Radon and Radon Progeny in Air and Demonstrations of Compliance AGENCY... Staff Guidance, ``Evaluations of Uranium Recovery Facility Surveys of Radon and Radon Progeny in Air and...

  15. Draft Final Risk Assessment Lime Settling Basins. Version 2.1

    DTIC Science & Technology

    1990-10-25

    TABLE OF CON "S Section Page EXECUTIVE SUMMARY ...................................... v 1.0 INTRODUCTION ..................................... 1 - 1 1.1...BACKGROUND AND RATIONALE ........................ 1 - 1 1.2 SUMMARY OF APPROACH ............................. 1 -3 1.3 REPORT FORMAT... 1 -4 2.0 SITE DESCRIPTION AND HISTORY ......................... 2- 1 3.0 PREFERRED ALTERNATIVE INTERIM ACTION TECHNOLOGY ..... 3- 1 4.0

  16. 76 FR 72725 - Draft License Renewal Interim Staff Guidance LR-ISG-2011-05: Ongoing Review of Operating Experience

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-25

    ... Experience.'' This LR-ISG provides guidance and clarification concerning ongoing review of plant-specific and... plants. As noticed on September 20, 2011 (76 FR 58311), the public comment period was extended and, as of... to communicate insights and lessons learned and to address emergent issues not covered in license...

  17. Multiple Alternatives for Educational Evaluation and Decision-Making. Interim Draft. Paper and Report Series No. 72.

    ERIC Educational Resources Information Center

    Wholeben, Brent E.

    This volume is an exposition of a mathematical modeling technique for use in the evaluation and solution of complex educational problems at all levels. It explores in detail the application of simple algebraic techniques to such issues as program reduction, fiscal rollbacks, and computer curriculum planning. Part I ("Introduction to the…

  18. Multiple Alternatives Modeling in Determining Fiscal Roll-Backs during Educational Funding Crises. Interim Draft. Paper and Report Series No. 70.

    ERIC Educational Resources Information Center

    Wholeben, Brent E.; Sullivan, John M.

    This report provides an extensive discussion of the use of criterion referenced, mathematical modeling procedures to determine which budget reductions minimize reduction in the quality of educational programs. Part I, "Evaluation of Potential Budgeting Roll-backs under Educational Fiscal Crisis," explains the basic design of multiple…

  19. 78 FR 15880 - Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-13

    ... Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: This regulation extends the time-limited interim tolerances for the... . II. Background A detailed summary of the background related to EPA's extension of the time-limited...

  20. EPA's Science Plan for Activities Related to Dioxins in the ...

    EPA Pesticide Factsheets

    The U.S. Environmental Protection Agency is currently addressing several issues related to dioxins and dioxin-like chemicals in the environment. These include the comprehensive human health and exposure assessment for dioxin, commonly called the dioxin reassessment and a review of dioxin soil clean-up levels currently in use across the United States. To move forward with both of these efforts, as well as other dioxin related activities, a plan with interim milestones has been developed and it is outlined below. EPA’sExposure and Human Health Reassessment of 2,3,7,8-Tetrachlorodibenzo-p-Dioxin(TCDD) and Related Compounds; Response to NAS and Completion of Dioxin Reassessment 1. EPA will release a draft report that responds to the recommendations and comments included in the National Academy of Sciences’ (NAS) 2006 review of EPA’s 2003 draft dioxin reassessment. UPDATED May 21, 2010: The draft response to comments report titled EPA’s Reanalysis of Key Issues Related to Dioxin Toxicity and Response to NAS Comments (External Review Draft) (“Draft Dioxin Reanalysis”) was completed and released for public review and comment on May 21, 2010. EPA’s National Center for Environment Assessment (NCEA) in the Office of Research and Development, will prepare a limited response to key comments and recommendations in the NAS report (draft response to comments report). The draft response will focus on dose-response

  1. Values, Valuing, and Evaluation. Research on Evaluation Program, Paper and Report Series. Interim Draft.

    ERIC Educational Resources Information Center

    Gephart, William J.

    The paper discusses the meaning of value and valuing, their roles in evaluation, and the potency of value systems in problem solving logic. Evaluation is defined as a process for facilitating decision making. A decision making situation occurs when there are options which are impossible to treat equivalently, and there is an impact in the…

  2. 10 CFR 8.5 - Interpretation by the General Counsel of § 73.55 of this chapter; illumination and physical...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Interpretation by the General Counsel of § 73.55 of this chapter; illumination and physical search requirements. 8.5 Section 8.5 Energy NUCLEAR REGULATORY... 0220, Draft Interim Acceptance Criteria for a Physical Security Plan for Nuclear Power Plants (March...

  3. 10 CFR 8.5 - Interpretation by the General Counsel of § 73.55 of this chapter; illumination and physical...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Interpretation by the General Counsel of § 73.55 of this chapter; illumination and physical search requirements. 8.5 Section 8.5 Energy NUCLEAR REGULATORY... 0220, Draft Interim Acceptance Criteria for a Physical Security Plan for Nuclear Power Plants (March...

  4. 10 CFR 8.5 - Interpretation by the General Counsel of § 73.55 of this chapter; illumination and physical...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Interpretation by the General Counsel of § 73.55 of this chapter; illumination and physical search requirements. 8.5 Section 8.5 Energy NUCLEAR REGULATORY... 0220, Draft Interim Acceptance Criteria for a Physical Security Plan for Nuclear Power Plants (March...

  5. 76 FR 69040 - Draft Guidance for Industry and Food and Drug Administration Staff; Class II Special Controls...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-07

    ...: In Vitro Diagnostic Devices for Yersinia Species Detection; Availability AGENCY: Food and Drug... availability of a draft guidance entitled ``Class II Special Controls Guidance Document: In Vitro Diagnostic Devices for Yersinia Species Detection.'' This draft guidance document describes a means by which in vitro...

  6. 18 CFR 300.20 - Interim acceptance and review of Bonneville Power Administration rates.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Interim acceptance and review of Bonneville Power Administration rates. 300.20 Section 300.20 Conservation of Power and Water... Director of the Office of Energy Market Regulation; or (ii) Deny the Administrator's interim rate request...

  7. Yucca Mountain nuclear waste repository prompts heated congressional hearing

    NASA Astrophysics Data System (ADS)

    Showstack, Randy

    2011-11-01

    Although the final report of the Blue Ribbon Commission on America's Nuclear Future is not expected until January 2012, the tentative conclusions of the commission's draft report were dissected during a recent joint hearing by two subcommittees of the House of Representatives' Committee on Science, Space, and Technology. Among the more heated issues debated at the hearing was the fate of the stalled Yucca Mountain nuclear waste repository in Nevada. The Blue Ribbon Commission's (BRC) draft report includes recommendations for managing nuclear waste and for developing one or more permanent deep geological repositories and interim storage facilities, but the report does not address the future of Yucca Mountain. The BRC charter indicates that the commission is to "conduct a comprehensive review of policies for managing the back end of the nuclear fuel cycle." However, the draft report states that the commission was not asked to consider, and therefore did not address, several key issues. "We have not rendered an opinion on the suitability of the Yucca Mountain site or on the request to withdraw the license application for Yucca Mountain," the draft report states.

  8. Stars By Which to Navigate? Scanning National and International Education Standards in 2009. An Interim Report on Common Core, NAEP, TIMSS and PISA

    ERIC Educational Resources Information Center

    Carmichael, Sheila Byrd; Wilson, W. Stephen; Finn, Chester E., Jr.; Winkler, Amber M.; Palmieri, Stafford

    2009-01-01

    Subject-matter experts reviewed the content, rigor, and clarity of the first public drafts of the "Common Core" standards released in September 2009 by the Common Core State Standards Initiative (CCSSI) of the National Governors Association and Council of Chief State School Officers. Using the same criteria, the same experts also…

  9. 77 FR 60124 - Draft Guidance for Industry on Initial Completeness Assessments for Type II Active Pharmaceutical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-02

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2012-D-1010] Draft Guidance for Industry on Initial Completeness Assessments for Type II Active Pharmaceutical... certain drug master files, namely, Type II active pharmaceutical ingredient (API) drug master files (DMFs...

  10. Some Contributions of General Systems Theory, Cybernetics Theory and Management Control Theory to Evaluation Theory and Practice. Research on Evaluation Program Paper and Report Series. Interim Draft.

    ERIC Educational Resources Information Center

    Cook, Desmond L.

    This document, one of a series of reports examining the possible contribution of other disciplines to evaluation methodology, describes the major elements of general systems theory (GST), cybernetics theory (CT) and management control theory (MCT). The author suggests that MCT encapsulates major concerns of evaluation since it reveals that…

  11. Using phase II data for the analysis of phase III studies: An application in rare diseases.

    PubMed

    Wandel, Simon; Neuenschwander, Beat; Röver, Christian; Friede, Tim

    2017-06-01

    Clinical research and drug development in orphan diseases are challenging, since large-scale randomized studies are difficult to conduct. Formally synthesizing the evidence is therefore of great value, yet this is rarely done in the drug-approval process. Phase III designs that make better use of phase II data can facilitate drug development in orphan diseases. A Bayesian meta-analytic approach is used to inform the phase III study with phase II data. It is particularly attractive, since uncertainty of between-trial heterogeneity can be dealt with probabilistically, which is critical if the number of studies is small. Furthermore, it allows quantifying and discounting the phase II data through the predictive distribution relevant for phase III. A phase III design is proposed which uses the phase II data and considers approval based on a phase III interim analysis. The design is illustrated with a non-inferiority case study from a Food and Drug Administration approval in herpetic keratitis (an orphan disease). Design operating characteristics are compared to those of a traditional design, which ignores the phase II data. An analysis of the phase II data reveals good but insufficient evidence for non-inferiority, highlighting the need for a phase III study. For the phase III study supported by phase II data, the interim analysis is based on half of the patients. For this design, the meta-analytic interim results are conclusive and would justify approval. In contrast, based on the phase III data only, interim results are inconclusive and require further evidence. To accelerate drug development for orphan diseases, innovative study designs and appropriate methodology are needed. Taking advantage of randomized phase II data when analyzing phase III studies looks promising because the evidence from phase II supports informed decision-making. The implementation of the Bayesian design is straightforward with public software such as R.

  12. Interim Feasibility Report and Draft Environmental Impact Statement, Grays Harbor, Chehalis and Hoquiam Rivers, Washington, Channel Improvements for Navigation.

    DTIC Science & Technology

    1982-06-01

    these conditions . Therefore, the no-action plan is not being recommended. With the present channel conditions and anticipated slow growth for... conditions very similar to those of today. No ocean disposal is anticipated. Because no significant growth in socioeconomic activity is expected without...accuracy; however, project construction provides conditions favorable for growth . The service industry would be expected to closely follow any increase

  13. Draft report: Results of stainless steel canister corrosion studies and environmental sample investigations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bryan, Charles R.; Enos, David

    2014-09-01

    This progress report describes work being done at Sandia National Laboratories (SNL) to assess the localized corrosion performance of container/cask materials used in the interim storage of used nuclear fuel. The work involves both characterization of the potential physical and chemical environment on the surface of the storage canisters and how it might evolve through time, and testing to evaluate performance of the canister materials under anticipated storage conditions.

  14. 17 CFR 402.2a - Appendix A-Calculation of market risk haircut for purposes of § 402.2(g)(2).

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... larger in absolute value of the two residual position interim haircuts being netted, and (ii) zero, in... category of the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in... the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in the...

  15. 17 CFR 402.2a - Appendix A-Calculation of market risk haircut for purposes of § 402.2(g)(2).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... larger in absolute value of the two residual position interim haircuts being netted, and (ii) zero, in... category of the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in... the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in the...

  16. 17 CFR 402.2a - Appendix A-Calculation of market risk haircut for purposes of § 402.2(g)(2).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... larger in absolute value of the two residual position interim haircuts being netted, and (ii) zero, in... category of the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in... the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in the...

  17. 17 CFR 402.2a - Appendix A-Calculation of market risk haircut for purposes of § 402.2(g)(2).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... larger in absolute value of the two residual position interim haircuts being netted, and (ii) zero, in... category of the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in... the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in the...

  18. 17 CFR 402.2a - Appendix A-Calculation of market risk haircut for purposes of § 402.2(g)(2).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... larger in absolute value of the two residual position interim haircuts being netted, and (ii) zero, in... category of the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in... the larger (in absolute value) of the two interim haircuts that were netted, and (2) a zero in the...

  19. 33 CFR 385.38 - Interim goals.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    .... (ii) Improvement in water quality; including: (A) Total phosphorus concentrations in the Everglades...) Increases in total spatial extent of restored wetlands; (B) Improvement in habitat quality; and (C... implementation process. In addition, interim goals will facilitate adaptive management and allow the Corps of...

  20. Determination of rainfall losses in Virginia, phase II : interim report.

    DOT National Transportation Integrated Search

    1981-01-01

    This interim report summarizes results obtained for the project through May 1981. The objective of the study is to develop rainfall loss parameters for localities in Virginia. For this purpose, the state has been divided into eleven hydrologic region...

  1. Mississippi Curriculum Framework for General Drafting (Program CIP: 48.0101--Drafting, General). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for two secondary-level courses in drafting: drafting I and II. Presented…

  2. A two-stage patient enrichment adaptive design in phase II oncology trials.

    PubMed

    Song, James X

    2014-01-01

    Illustrated is the use of a patient enrichment adaptive design in a randomized phase II trial which allows the evaluation of treatment benefits by the biomarker expression level and makes interim adjustment according to the pre-specified rules. The design was applied to an actual phase II metastatic hepatocellular carcinoma (HCC) trial in which progression-free survival (PFS) in two biomarker-defined populations is evaluated at both interim and final analyses. As an extension, a short-term biomarker is used to predict the long-term PFS in a Bayesian model in order to improve the precision of hazard ratio (HR) estimate at the interim analysis. The characteristics of the extended design are examined in a number of scenarios via simulations. The recommended adaptive design is shown to be useful in a phase II setting. When a short-term maker which correlates with the long-term PFS is available, the design can be applied in smaller early phase trials in which PFS requires longer follow-up. In summary, the adaptive design offers flexibility in randomized phase II patient enrichment trials and should be considered in an overall personalized healthcare (PHC) strategy. Copyright © 2013 Elsevier Inc. All rights reserved.

  3. 76 FR 64228 - Draft Guidance for Industry and Food and Drug Administration Staff; Class II Special Controls...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ...: External Pacemaker Pulse Generator; Availability AGENCY: Food and Drug Administration, HHS. ACTION: Notice... entitled ``Class II Special Controls Guidance Document: External Pacemaker Pulse Generator.'' This draft guidance document describes a means by which external pacemaker pulse generators may comply with the...

  4. The use of robotics for nondestructive inspection of steel highway bridges and structures: interim report.

    DOT National Transportation Integrated Search

    1998-01-01

    This interim report describes the progress during the first year of a project to develop robotics hardware for nondestructive evaluation of steel structures. The project objectives are to (1) develop and test an improved prototype (POLECAT-II) crawli...

  5. A State Articulated Instructional Objectives Guide for Occupational Education Programs. State Pilot Model for Drafting (Graphic Communications). Part I--Basic. Part II--Specialty Programs. Section A (Mechanical Drafting and Design). Section B (Architectural Drafting and Design).

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Community Colleges, Raleigh.

    A two-part articulation instructional objective guide for drafting (graphic communications) is provided. Part I contains summary information on seven blocks (courses) of instruction. They are as follow: introduction; basic technical drafting; problem solving in graphics; reproduction processes; freehand drawing and sketching; graphics composition;…

  6. 76 FR 14568 - Federal Acquisition Regulation; Use of Commercial Services Item Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-16

    ...-AL44 Federal Acquisition Regulation; Use of Commercial Services Item Authority AGENCIES: Department of... interim rule amending the Federal Acquisition Regulation (FAR) to implement section 868 of the Duncan... interim rule. II. Discussion/Analysis The analysis of public comments by the Defense Acquisition...

  7. 75 FR 59726 - Draft Guidance for Industry and Food and Drug Administration Staff; Class II Special Controls...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-28

    ... method comparison section and the sample selection inclusion and exclusion criteria section. The... DEPARTMENT OF HEALTH AND HUMAN SERVICES Food and Drug Administration [Docket No. FDA-2010-D-0428] Draft Guidance for Industry and Food and Drug Administration Staff; Class II Special Controls Guidance...

  8. Potential System Integration Issues in the Joint Multi-Role (JMR) Joint Common Architecture (JCA) Demonstration System

    DTIC Science & Technology

    2015-12-01

    the MIS System/Subsystem Specification ( SSS ), and supplementary BAA document. On June 26, 2014, the SEI provided a draft interim report of the...findings and issues. The SEI team also received July 3, 2014, versions of the MIS Stakeholder Requirements, MIS SSS , and build plan and July 17, 2014...versions of the MIS SSS together with the MIS system model. On July 14–15, 2014, the SEI presented a summary of the issues at the two contractors

  9. Membrane Bioreactor/Ultra Low Energy Reverse Osmosis Membrane Process for Forward Operating Base Wastewater Reuse

    DTIC Science & Technology

    2014-08-01

    of the GEGR pilot membrane coater; b) configuration of the coating station; and c) web path of the dip-knife coating process for RO membrane...Energy-dispersive X-ray spectroscopy EPA Environmental Protection Agency F:M Food-To-Microorganism Ratio FOB Forward Operating Base FT- IR Fourier...report 03/2014 3.3 Submit draft Interim report/Go No-Go decision point white paper 05/2013 3.4 Submit final report 05/2014 3.5 Final debrief

  10. Making medical records professional(s).

    PubMed

    Mason, A

    1987-07-01

    In 1986 a joint medical records project group was set up by the Institute of Health Services Management, the Association of Health Care Information and Medical Records Officers and the NHS Training Authority, with Mr Vic Peel as chairman. The group was supported by Arthur Andersen & Co, management consultants. The following is a shortened and edited version of an interim report drafted for the group by Dr Alastair Mason. It is intended for discussion and does not yet represent the definitive views of the sponsoring bodies.

  11. Screening assessment and requirements for a comprehensive assessment: Volume 1, Draft. Columbia River comprehensive impact assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-04-01

    To evaluate the impact to the Columbia River from the Hanford Site-derived contaminants, the U.S. Department of Energy, U.S. Environmental Protection Agency, and Washington State Department of Ecology initiated a study referred to as the Columbia River Comprehensive Impact Assessment (CRCIA). To address concerns about the scope and direction of CRCIA as well as enhance regulator, tribal, stockholder, and public involvement, the CRCIA Management Team was formed in August 1995. The Team agreed to conduct CRCIA using a phased approach. The initial phase, includes two components: 1) a screening assessment to evaluate the potential impact to the river, resulting frommore » current levels of Hanford-derived contaminants in order to support decisions on Interim Remedial Measures, and 2) a definition of the essential work remaining to provide an acceptable comprehensive river impact assessment. The screening assessment is described in Part I of this report. The essential work remaining is Part II of this report. The objective of the screening assessment is to identify areas where the greatest potential exists for adverse effects on humans or the environment. Part I of this report discusses the scope, technical approach, and results of the screening assessment. Part II defines a new paradigm for predecisional participation by those affected by Hanford cleanup decisions.« less

  12. Report of Programme Commission II (Natural Sciences).

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Paris (France). General Conference.

    As the first part of the report of the Programme Commission II, a summary of discussions on plans for natural sciences and their applications is presented in this document. The two agenda items are: (1) detailed consideration of the 1973-74 draft program and budget and of the 1973-78 draft medium-term outline, and (2) desirability of adopting an…

  13. Computer Aided Drafting Packages for Secondary Education. Edition 1. Apple II and Macintosh. A MicroSIFT Quarterly Report.

    ERIC Educational Resources Information Center

    Pollard, Jim

    This report reviews software packages for Apple Macintosh and Apple II computers available to secondary schools to teach computer-aided drafting (CAD). Products for the report were gathered through reviews of CAD periodicals, computers in education periodicals, advertisements, and teacher recommendations. The first section lists the primary…

  14. Interim analysis of postoperative chemoradiotherapy with capecitabine and oxaliplatin versus capecitabine alone for pathological stage II and III rectal cancer: a randomized multicenter phase III trial.

    PubMed

    Feng, Yan-Ru; Zhu, Yuan; Liu, Lu-Ying; Wang, Wei-Hu; Wang, Shu-Lian; Song, Yong-Wen; Wang, Xin; Tang, Yuan; Liu, Yue-Ping; Ren, Hua; Fang, Hui; Zhang, Shi-Ping; Liu, Xin-Fan; Yu, Zi-Hao; Li, Ye-Xiong; Jin, Jing

    2016-05-03

    The aim of this study is to present an interim analysis of a phase III trial (NCT00714077) of postoperative concurrent capecitabine and radiotherapy with or without oxaliplatin for pathological stage II and III rectal cancer. Patients with pathologically confirmed stage II and III rectal cancer were randomized to either radiotherapy with concurrent capecitabine (Cap-RT group) or with capecitabine and oxaliplatin (Capox-RT group). The primary endpoint was 3-year disease-free survival rate (DFS). The 3-year DFS rate was 73.9% in the Capox-RT group and 71.6% in the Cap-RT group (HR 0.92, p = 0.647), respectively. No significant difference was observed in overall survival, cumulative incidence of local recurrence and distant metastasis between the two groups (p > 0.05). More grade 3-4 acute toxicity was observed in the Capox-RT group than in the Cap-RT group (38.1% vs. 29.2%, p = 0.041). Inclusion of oxaliplatin in the capecitabine-based postoperative regimen did not improve DFS but increased toxicities for pathological stage II and III rectal cancer in this interim analysis.

  15. 77 FR 50069 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    .... Grace & Co., Inc./Wayne Interim Storage (USDOE) Superfund Site AGENCY: Environmental Protection Agency... issuing a Notice of Intent to Delete the W.R. Grace & Co., Inc./Wayne Interim Storage (USDOE) Superfund..., NY 10007-1866. Hand Delivery: U.S. EPA Superfund Records Center, Region II, 290 Broadway, 18th Floor...

  16. 40 CFR 1054.145 - Are there interim provisions that apply only for a limited time?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-IGNITION ENGINES AND EQUIPMENT Emission Standards and Related Requirements § 1054.145 Are there interim... Phase 3 implementation for engine manufacturers. Small-volume engine manufacturers may delay complying... II engines and until 2014 for Class I engines. The running loss standards in § 1054.112 also do not...

  17. Predicting Backdrafting and Spillage for Natural-Draft Gas Combustion Appliances: Validating VENT-II

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rapp, Vi H.; Pastor-Perez, Albert; Singer, Brett C.

    2013-04-01

    VENT-II is a computer program designed to provide detailed analysis of natural draft and induced draft combustion appliance vent-systems (i.e., furnace or water heater). This program is capable of predicting house depressurization thresholds that lead to backdrafting and spillage of combustion appliances; however, validation reports of the program being applied for this purpose are not readily available. The purpose of this report is to assess VENT-II’s ability to predict combustion gas spillage events due to house depressurization by comparing VENT-II simulated results with experimental data for four appliance configurations. The results show that VENT-II correctly predicts depressurizations resulting in spillagemore » for natural draft appliances operating in cold and mild outdoor conditions, but not for hot conditions. In the latter case, the predicted depressurizations depend on whether the vent section is defined as part of the vent connector or the common vent when setting up the model. Overall, the VENTII solver requires further investigation before it can be used reliably to predict spillage caused by depressurization over a full year of weather conditions, especially where hot conditions occur.« less

  18. Failsafe automation of Phase II clinical trial interim monitoring for stopping rules.

    PubMed

    Day, Roger S

    2010-02-01

    In Phase II clinical trials in cancer, preventing the treatment of patients on a study when current data demonstrate that the treatment is insufficiently active or too toxic has obvious benefits, both in protecting patients and in reducing sponsor costs. Considerable efforts have gone into experimental designs for Phase II clinical trials with flexible sample size, usually implemented by early stopping rules. The intended benefits will not ensue, however, if the design is not followed. Despite the best intentions, failures can occur for many reasons. The main goal is to develop an automated system for interim monitoring, as a backup system supplementing the protocol team, to ensure that patients are protected. A secondary goal is to stimulate timely recording of patient assessments. We developed key concepts and performance needs, then designed, implemented, and deployed a software solution embedded in the clinical trials database system. The system has been in place since October 2007. One clinical trial tripped the automated monitor, resulting in e-mails that initiated statistician/investigator review in timely fashion. Several essential contributing activities still require human intervention, institutional policy decisions, and institutional commitment of resources. We believe that implementing the concepts presented here will provide greater assurance that interim monitoring plans are followed and that patients are protected from inadequate response or excessive toxicity. This approach may also facilitate wider acceptance and quicker implementation of new interim monitoring algorithms.

  19. A Process Evaluation of Project Developmental Continuity. Interim Report IV, Volume 2: Development of the Implementation and Cost Studies.

    ERIC Educational Resources Information Center

    Smith, Allen G.; And Others

    This interim report describes the development of program implementation and cost studies for Year II of the process evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Specific areas focused…

  20. Statistical Tools for Fitting Models of the Population Consequences of Acoustic Disturbance to Data from Marine Mammal Populations (PCAD Tools II)

    DTIC Science & Technology

    2015-09-30

    Interim PCOD approach. In both of these case studies we relied on expert knowledge to link disturbance to vital rates. In the right whale case study...the Interim Population Consequences of Disturbance ( PCoD ) Approach: Quantifying and Assessing the Effects of UK Offshore Renewable Energy

  1. The 1944 Nisei Draft at Heart Mountain, Wyoming: Its Relationship to the Historical Representation of the World War II Japanese American Evacuation.

    ERIC Educational Resources Information Center

    Hansen, Arthur A.

    1996-01-01

    Presents a lesson plan that not only illuminates a little-known incident in Asian American history but also questions how history is constructed and communicated. Provides an excellent historical account of the draft resistance movement within the Nisei internment camps during World War II. Includes handouts and discussion questions. (MJP)

  2. A phase II flexible screening design allowing for interim analysis and comparison with historical control.

    PubMed

    Wu, Wenting; Bot, Brian; Hu, Yan; Geyer, Susan M; Sargent, Daniel J

    2013-07-01

    Sargent and Goldberg [1] proposed a randomized phase II flexible screening design (SG design) which took multiple characteristics of candidate regimens into consideration in selecting a regimen for further phase III testing. In this paper, we extend the SG design by including provisions for an interim analysis and/or a comparison to a historical control. By including a comparison with a historical control, a modified SG design not only identifies a more promising treatment but also assures that the regimen has a clinically meaningful level of efficacy as compared to a historical control. By including an interim analysis, a modified SG design could reduce the number of patients exposed to inferior treatment regimens. When compared to the original SG design, the modified designs increase the sample size moderately, but expand the utility of the flexible screening design substantially. Copyright © 2013 Elsevier Inc. All rights reserved.

  3. Draft Final Decision Document for the North Boundary System Improvements Interim Response Action at the Rocky Mountain Arsenal

    DTIC Science & Technology

    1989-04-01

    and Safety Plan has been developed for the prevention of occupational injuries and illnesses during field activities at RMA. This plan addresses...totaltriThelomethanes radmiutm CD 10(1) 5 .13)* 10(4 Larbon tetrachloride CCL4 0(3)5.4 ’tordane CDN0.004(l) 0.00046(5) CLI3oride CL 250,000(l...numerous carcinogenicity tests in a variety of animals indicate that dieldrin promotes only liver tumors and the tumors develop only in mice. On the basis of

  4. Draft Maumee River Watershed Restoration Plan

    EPA Pesticide Factsheets

    A draft of the Maumee River AOC Watershed Restoration Plan was completed in January 2006. The plan was created to meet requirements for the stage II RAP as well as Ohio EPA’s and ODNR’s Watershed Coordinator Program.

  5. Interim Draft: Biological Sampling and Analysis Plan Outline ...

    EPA Pesticide Factsheets

    Standard Operation Procedures This interim sampling and analysis plan (SAP) outline was developed specifically as an outline of the output that will be generated by a developing on-line tool called the MicroSAP. The goal of the MicroSAP tool is to assist users with development of SAPs needed for site characterization, verification sampling, and post decontamination sampling stages of biological sampling and analysis activities in which the EPA would be responsible for conducting sampling. These activities could include sampling and analysis for a biological contamination incident, a research study, or an exercise. The development of this SAP outline did not consider the initial response of an incident, as it is assumed that the initial response would have been previously completed by another agency during the response, or the clearance phase, as it is assumed that separate committee would be established to make decisions regarding clearing a site. This outline also includes considerations for capturing the associated data quality objectives in the SAP.

  6. Statistical aspects of the TNK-S2B trial of tenecteplase versus alteplase in acute ischemic stroke: an efficient, dose-adaptive, seamless phase II/III design.

    PubMed

    Levin, Bruce; Thompson, John L P; Chakraborty, Bibhas; Levy, Gilberto; MacArthur, Robert; Haley, E Clarke

    2011-08-01

    TNK-S2B, an innovative, randomized, seamless phase II/III trial of tenecteplase versus rt-PA for acute ischemic stroke, terminated for slow enrollment before regulatory approval of use of phase II patients in phase III. (1) To review the trial design and comprehensive type I error rate simulations and (2) to discuss issues raised during regulatory review, to facilitate future approval of similar designs. In phase II, an early (24-h) outcome and adaptive sequential procedure selected one of three tenecteplase doses for phase III comparison with rt-PA. Decision rules comparing this dose to rt-PA would cause stopping for futility at phase II end, or continuation to phase III. Phase III incorporated two co-primary hypotheses, allowing for a treatment effect at either end of the trichotomized Rankin scale. Assuming no early termination, four interim analyses and one final analysis of 1908 patients provided an experiment-wise type I error rate of <0.05. Over 1,000 distribution scenarios, each involving 40,000 replications, the maximum type I error in phase III was 0.038. Inflation from the dose selection was more than offset by the one-half continuity correction in the test statistics. Inflation from repeated interim analyses was more than offset by the reduction from the clinical stopping rules for futility at the first interim analysis. Design complexity and evolving regulatory requirements lengthened the review process. (1) The design was innovative and efficient. Per protocol, type I error was well controlled for the co-primary phase III hypothesis tests, and experiment-wise. (2a) Time must be allowed for communications with regulatory reviewers from first design stages. (2b) Adequate type I error control must be demonstrated. (2c) Greater clarity is needed on (i) whether this includes demonstration of type I error control if the protocol is violated and (ii) whether simulations of type I error control are acceptable. (2d) Regulatory agency concerns that protocols for futility stopping may not be followed may be allayed by submitting interim analysis results to them as these analyses occur.

  7. Schedules of Controlled Substances: Placement of FDA-Approved Products of Oral Solutions Containing Dronabinol [(-)-delta-9-transtetrahydrocannabinol (delta-9-THC)] in Schedule II. Interim final rule, with request for comments.

    PubMed

    2017-03-23

    On July 1, 2016, the U.S. Food and Drug Administration (FDA) approved a new drug application for Syndros, a drug product consisting of dronabinol [(-)-delta-9-trans-tetrahydrocannabinol (delta-9-THC)] oral solution. Thereafter, the Department of Health and Human Services (HHS) provided the Drug Enforcement Administration (DEA) with a scheduling recommendation that would result in Syndros (and other oral solutions containing dronabinol) being placed in schedule II of the Controlled Substances Act (CSA). In accordance with the CSA, as revised by the Improving Regulatory Transparency for New Medical Therapies Act, DEA is hereby issuing an interim final rule placing FDA-approved products of oral solutions containing dronabinol in schedule II of the CSA.

  8. Editing Tips for Technical Publications in the Joint Nuclear Weapons Publication System (JNWPS)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ALLEN, TARA S.

    2002-12-01

    These editing tips contain helpful suggestions to assist writers who are writing, editing, and publishing technical publications in the JNWPS. The suggestions clarify some of the most common writing problems and requirements of two publications used in the JNWPS: ''DOE-DTRA TP 1-1, Joint Nuclear Weapons Publications System Operating Procedures, Specifications, and Standards, and United States Government Printing Office Style Manual''. Topics include requirements for abbreviations, formats for drafts, layouts of illustrations and tables, appropriate wording for interim changes, guidance for creating a list of effective pages, how to insert and delete pages and paragraphs, referencing other technical publications, use ofmore » revision bars, requirements for safety precautions, use of hyphens, and how to place warnings, cautions, and notes. Also included are a writer's checklist, samples of draft title pages, and a section of helpful tips for the writers who use the department's desktop publishing software program, Adobe{reg_sign} FrameMaker{reg_sign}.« less

  9. 76 FR 2725 - Draft Regulatory Guide: Issuance, Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-14

    .... The draft regulatory guide, entitled, ``Inspection of Water-Control Structures Associated with Nuclear... and surveillance program for dams, slopes, canals, and other water-control structures associated with emergency cooling water systems or flood protection of nuclear power plants. II. Further Information The NRC...

  10. Receiver design, performance analysis, and evaluation for space-borne laser altimeters and space-to-space laser ranging systems

    NASA Technical Reports Server (NTRS)

    Davidson, Frederic M.; Sun, Xiaoli; Field, Christopher T.

    1995-01-01

    This Interim report consists of a manuscript, 'Receiver Design for Satellite to Satellite Laser Ranging Instrument,' and copies of two papers we co-authored, 'Demonstration of High Sensitivity Laser Ranging System' and 'Semiconductor Laser-Based Ranging Instrument for Earth Gravity Measurements. ' These two papers were presented at the conference Semiconductor Lasers, Advanced Devices and Applications, August 21 -23, 1995, Keystone Colorado. The manuscript is a draft in the preparation for publication, which summarizes the theory we developed on space-borne laser ranging instrument for gravity measurements.

  11. Standardized Curriculum for General Drafting.

    ERIC Educational Resources Information Center

    Mississippi State Dept. of Education, Jackson. Office of Vocational, Technical and Adult Education.

    Standardized vocational education course titles and core contents for two courses in Mississippi are provided: general drafting I and II. The first course contains the following units: (1) orientation; (2) introduction to mechanical drawing; (3) lettering; (4) geometric construction; (5) basic computer-assisted design (CAD); (6) orthographic…

  12. Field testing of hand-held infrared thermography, phase II TPF-5(247) : final report.

    DOT National Transportation Integrated Search

    2016-05-01

    This report is the second of two volumes that document results from the pooled fund study TPF-5 (247), Development of : Handheld Infrared Thermography, Phase II. The interim report (volume I) studied the implementation of handheld thermography : by p...

  13. Emission reduction potentials of improved cookstoves and their issues in adoption: An Indian outlook.

    PubMed

    Sharma, Monikankana; Dasappa, S

    2017-12-15

    Biomass as a fuel for cooking is a common practice in rural India, and about 700 million people use traditional stoves to meet their energy demand. However, the thermal and the combustion efficiencies of these stoves are very low, leading to an inefficient use of biomass, and also, resulting in significant indoor air pollution. Research development has however led to the development of some improved stoves viz., natural draft and forced draft for both domestic as well as large scale cooking applications and government is trying to promote them. Forced draft stoves using processed biomass fuels (pellets) have received more prominence due to their superior performance, however, higher initial cost and limited fuel distribution networks have remained the key challenges. Improved natural draft stoves too have gained attention for being relatively inexpensive, and they are more likely to hit the rural households. In this paper, we have examined the environmental benefits obtained by the use of improved stoves for two important scenarios: traditional stoves are replaced by (i)improved natural draft stoves and, (ii) by improved natural draft as well as forced draft stoves. In the best case scenario (case ii), i.e., by shifting 111 million households who currently use wood to the forced draft stoves, and another 45 million households who are dependent on dung cake and agro residues to the improved natural draft stoves, the emission reduction that can be achieved are as follows: particulate matter (PM) 875 kT, black carbon (BC) 229 kT, organic carbon (OC) 525 kT, methane (CH 4 )1178 kT and non methane hydrocarbon (NMHC) of 564 kT. With the promotion of only natural draft improved stoves, the total reductions would be ∼12% lower than the combinational promotion. The CO 2 equivalent reduction is estimated to be ∼70-80 MT per year. Copyright © 2017 Elsevier Ltd. All rights reserved.

  14. 40 CFR 60.57b - Siting requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...)(1)(ii) of this section. (i) The owner or operator shall distribute the preliminary draft materials... amount of waste generation anticipated for the service area. (C) The types and estimated amounts of... operator shall distribute the siting analysis and final draft materials separation plan to the principal...

  15. 40 CFR 60.57b - Siting requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...)(1)(ii) of this section. (i) The owner or operator shall distribute the preliminary draft materials... amount of waste generation anticipated for the service area. (C) The types and estimated amounts of... operator shall distribute the siting analysis and final draft materials separation plan to the principal...

  16. 40 CFR 60.57b - Siting requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...)(1)(ii) of this section. (i) The owner or operator shall distribute the preliminary draft materials... amount of waste generation anticipated for the service area. (C) The types and estimated amounts of... operator shall distribute the siting analysis and final draft materials separation plan to the principal...

  17. 40 CFR 60.57b - Siting requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...)(1)(ii) of this section. (i) The owner or operator shall distribute the preliminary draft materials... amount of waste generation anticipated for the service area. (C) The types and estimated amounts of... operator shall distribute the siting analysis and final draft materials separation plan to the principal...

  18. Draft Background Document: Summary of Data on Municipal ...

    EPA Pesticide Factsheets

    ... it •i HI it 221 IM ll HA ii ii HA it ii NA il li NA II 12.' 1*8 1.113 •l Nt ii ii NA •• -.*l UQ • NT .2* «ff .Uj •• HA II -.115 ll N* il • l 1 .91 j •• NA ii .1?.' - tit .mi .112 ...

  19. 76 FR 22903 - Draft Guidance for Industry and Food and Drug Administration Staff; Establishing That a Tobacco...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-25

    ... things, dated copies of advertisements, dated catalog pages, and dated promotional material. II. Significance of Guidance This draft guidance is being issued consistent with FDA's good guidance practices... manufacturer provide evidence that may include, among other things, dated copies of advertisements, dated...

  20. 34 CFR 668.58 - Interim disbursements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., ACG, National SMART Grant, or campus-based program funds to the applicant; (ii) Employ the applicant..., ACG, National SMART Grant, or campus-based funds; or (ii)(A) May make one disbursement of any combination of Federal Pell Grant, ACG, National SMART Grant, Federal Perkins Loan, or FSEOG funds for the...

  1. 34 CFR 668.58 - Interim disbursements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., ACG, National SMART Grant, or campus-based program funds to the applicant; (ii) Employ the applicant..., ACG, National SMART Grant, or campus-based funds; or (ii)(A) May make one disbursement of any combination of Federal Pell Grant, ACG, National SMART Grant, Federal Perkins Loan, or FSEOG funds for the...

  2. Technology Readiness Assessment (TRA) Deskbook

    DTIC Science & Technology

    2003-09-01

    be certified as being compliant with the FMEA by the Under Secretary of Defense (Comptroller) (USD(C)). B.3 A COMMENT ON THE TRA PROCESS The Interim...I-2 1.4 Acquisition Process Overview...II-6 2.2.3 Processing the TRA Results .......................................................... II-6 2.3 Component Acquisition Executive (CAE

  3. Exploring the statistical and clinical impact of two interim analyses on the Phase II design with option for direct assignment.

    PubMed

    An, Ming-Wen; Mandrekar, Sumithra J; Edelman, Martin J; Sargent, Daniel J

    2014-07-01

    The primary goal of Phase II clinical trials is to understand better a treatment's safety and efficacy to inform a Phase III go/no-go decision. Many Phase II designs have been proposed, incorporating randomization, interim analyses, adaptation, and patient selection. The Phase II design with an option for direct assignment (i.e. stop randomization and assign all patients to the experimental arm based on a single interim analysis (IA) at 50% accrual) was recently proposed [An et al., 2012]. We discuss this design in the context of existing designs, and extend it from a single-IA to a two-IA design. We compared the statistical properties and clinical relevance of the direct assignment design with two IA (DAD-2) versus a balanced randomized design with two IA (BRD-2) and a direct assignment design with one IA (DAD-1), over a range of response rate ratios (2.0-3.0). The DAD-2 has minimal loss in power (<2.2%) and minimal increase in T1ER (<1.6%) compared to a BRD-2. As many as 80% more patients were treated with experimental vs. control in the DAD-2 than with the BRD-2 (experimental vs. control ratio: 1.8 vs. 1.0), and as many as 64% more in the DAD-2 than with the DAD-1 (1.8 vs. 1.1). We illustrate the DAD-2 using a case study in lung cancer. In the spectrum of Phase II designs, the direct assignment design, especially with two IA, provides a middle ground with desirable statistical properties and likely appeal to both clinicians and patients. Copyright © 2014 Elsevier Inc. All rights reserved.

  4. 76 FR 28688 - Draft Guidance for Industry and Food and Drug Administration Staff; Class II Special Controls...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-18

    ... Controls Guidance Document: In Vitro Diagnostic Devices for Bacillus Species Detection AGENCY: Food and... Guidance Document: In Vitro Diagnostic Devices for Bacillus spp. Detection.'' This draft guidance document describes means by which in vitro diagnostic devices for Bacillus species (spp.) detection may comply with...

  5. 76 FR 19784 - Notice of Availability of the Draft Environmental Impact Statement and Draft Resource Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-08

    ... generation facility capable of generating up to 425 megawatts (MW) of electricity. Up to 170 wind turbines..., eliminating turbines from areas of VRM Class II, precluding construction and maintenance activities during... Amendment to the 1987 Jarbidge Resource Management Plan for the Proposed China Mountain Wind Project AGENCY...

  6. 78 FR 21965 - Notice of Availability of the Draft Tri-County Resource Management Plan and Draft Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... wind and geothermal energy projects from aplomado falcon habitat and avoidance of wind and geothermal..., including renewable energy siting, outdoor recreation management, special status species habitat, proposals... geothermal leasing; management as VRM Class II; and limitation of vehicle use to designated routes. Brokeoff...

  7. Current Assessment and Classification of Suicidal Phenomena using the FDA 2012 Draft Guidance Document on Suicide Assessment: A Critical Review.

    PubMed

    Sheehan, David V; Giddens, Jennifer M; Sheehan, Kathy Harnett

    2014-09-01

    Standard international classification criteria require that classification categories be comprehensive to avoid type II error. Categories should be mutually exclusive and definitions should be clear and unambiguous (to avoid type I and type II errors). In addition, the classification system should be robust enough to last over time and provide comparability between data collections. This article was designed to evaluate the extent to which the classification system contained in the United States Food and Drug Administration 2012 Draft Guidance for the prospective assessment and classification of suicidal ideation and behavior in clinical trials meets these criteria. A critical review is used to assess the extent to which the proposed categories contained in the Food and Drug Administration 2012 Draft Guidance are comprehensive, unambiguous, and robust. Assumptions that underlie the classification system are also explored. The Food and Drug Administration classification system contained in the 2012 Draft Guidance does not capture the full range of suicidal ideation and behavior (type II error). Definitions, moreover, are frequently ambiguous (susceptible to multiple interpretations), and the potential for misclassification (type I and type II errors) is compounded by frequent mismatches in category titles and definitions. These issues have the potential to compromise data comparability within clinical trial sites, across sites, and over time. These problems need to be remedied because of the potential for flawed data output and consequent threats to public health, to research on the safety of medications, and to the search for effective medication treatments for suicidality.

  8. 77 FR 16123 - Draft Guidance for Industry and Food and Drug Administration Staff; Class II Special Controls...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-19

    ...; Class II Special Controls Guidance Document: Nucleic Acid-Based In Vitro Diagnostic Devices for the... Guidance for Industry and Food and Drug Administration Staff; Class II Special Controls Guidance Document... II Special Controls Guidance Document: Nucleic Acid-Based In Vitro Diagnostic Devices for the...

  9. Project FARE task II report : urban mass transportation industry survey of reporting capability : interim task II report for July-November 1972 period

    DOT National Transportation Integrated Search

    1972-11-01

    Report contains a description of the work done to evaluate the capability of the urban mass transit industry to report financial and operating data through a uniform reporting system. Techniques used in the evaluation included a questionnaire survey ...

  10. 40 CFR Appendix A to Subpart E of... - Interim Transmission Electron Microscopy Analytical Methods-Mandatory and Nonmandatory-and...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... representative of the air entering the abatement site. c. Two field blanks are to be taken by removing the cap... of Sample Data Quality Objectives is shown in the following Table II: EC01AP92.003 C. Sample Shipment... or the Burdette procedure (Ref. 7 of Unit II.J.) ii. Plasma etching of the collapsed filter is...

  11. 40 CFR Appendix A to Subpart E of... - Interim Transmission Electron Microscopy Analytical Methods-Mandatory and Nonmandatory-and...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... representative of the air entering the abatement site. c. Two field blanks are to be taken by removing the cap... of Sample Data Quality Objectives is shown in the following Table II: EC01AP92.003 C. Sample Shipment... or the Burdette procedure (Ref. 7 of Unit II.J.) ii. Plasma etching of the collapsed filter is...

  12. 77 FR 12543 - Endangered and Threatened Wildlife and Plants; Revised Critical Habitat for Riverside Fairy Shrimp

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ...; reopening of comment period, notice of availability of draft economic analysis, and amended required... 3(5)(A)(ii) of the Act because these areas are essential for the conservation of the species but.... We also announce the availability of a draft economic analysis (DEA) of the proposed designation of...

  13. Quantifying the bias in the estimated treatment effect in randomized trials having interim analyses and a rule for early stopping for futility.

    PubMed

    Walter, S D; Han, H; Briel, M; Guyatt, G H

    2017-04-30

    In this paper, we consider the potential bias in the estimated treatment effect obtained from clinical trials, the protocols of which include the possibility of interim analyses and an early termination of the study for reasons of futility. In particular, by considering the conditional power at an interim analysis, we derive analytic expressions for various parameters of interest: (i) the underestimation or overestimation of the treatment effect in studies that stop for futility; (ii) the impact of the interim analyses on the estimation of treatment effect in studies that are completed, i.e. that do not stop for futility; (iii) the overall estimation bias in the estimated treatment effect in a single study with such a stopping rule; and (iv) the probability of stopping at an interim analysis. We evaluate these general expressions numerically for typical trial scenarios. Results show that the parameters of interest depend on a number of factors, including the true underlying treatment effect, the difference that the trial is designed to detect, the study power, the number of planned interim analyses and what assumption is made about future data to be observed after an interim analysis. Because the probability of stopping early is small for many practical situations, the overall bias is often small, but a more serious issue is the potential for substantial underestimation of the treatment effect in studies that actually stop for futility. We also consider these ideas using data from an illustrative trial that did stop for futility at an interim analysis. Copyright © 2017 John Wiley & Sons, Ltd. Copyright © 2017 John Wiley & Sons, Ltd.

  14. State-Wide Evaluation of the New Hampshire ESEA Title II, Part D Grant Program. Interim Report

    ERIC Educational Resources Information Center

    Knestis, Kirk; Smoke-Zur, Naomi; Higgins, Cathy

    2010-01-01

    The Title II-D grant program, "Enhancing Education Through Technology," (EETT) provides financial assistance to higher poverty school districts that have the greatest need for technology support or have been identified as being in need of improvement. In 2009, the American Reinvestment and Recovery Act (ARRA) provided an additional $650…

  15. New Bedford, Studies of PCBs in the Acushnet River Estuary: Draft Working Copy

    EPA Pesticide Factsheets

    2012-04-22

    ... dlii;>i::n!!iii!:ii!!i, i; ampl ii I! xl; nin:: t: i oin tliiiiit!; l;itiit: i-1 n mi na t: i-> s; iii'iLiiii.'iiwiiiiinii iiunij cliEiiiiirinij p roll 1 1!! nn si ii s !i DC li at:IM:! ... Conit roll ...

  16. Lead us not into tanktation: a simulation modelling approach to gain insights into incentives for sporting teams to tank.

    PubMed

    Tuck, Geoffrey N; Whitten, Athol R

    2013-01-01

    Annual draft systems are the principal method used by teams in major sporting leagues to recruit amateur players. These draft systems frequently take one of three forms: a lottery style draft, a weighted draft, or a reverse-order draft. Reverse-order drafts can create incentives for teams to deliberately under-perform, or tank, due to the perceived gain from obtaining quality players at higher draft picks. This paper uses a dynamic simulation model that captures the key components of a win-maximising sporting league, including the amateur player draft, draft choice error, player productivity, and between-team competition, to explore how competitive balance and incentives to under-perform vary according to league characteristics. We find reverse-order drafts can lead to some teams cycling between success and failure and to other teams being stuck in mid-ranking positions for extended periods of time. We also find that an incentive for teams to tank exists, but that this incentive decreases (i) as uncertainty in the ability to determine quality players in the draft increases, (ii) as the number of teams in the league reduces, (iii) as team size decreases, and (iv) as the number of teams adopting a tanking strategy increases. Simulation models can be used to explore complex stochastic dynamic systems such as sports leagues, where managers face difficult decisions regarding the structure of their league and the desire to maintain competitive balance.

  17. Lead Us Not into Tanktation: A Simulation Modelling Approach to Gain Insights into Incentives for Sporting Teams to Tank

    PubMed Central

    Tuck, Geoffrey N.; Whitten, Athol R.

    2013-01-01

    Annual draft systems are the principal method used by teams in major sporting leagues to recruit amateur players. These draft systems frequently take one of three forms: a lottery style draft, a weighted draft, or a reverse-order draft. Reverse-order drafts can create incentives for teams to deliberately under-perform, or tank, due to the perceived gain from obtaining quality players at higher draft picks. This paper uses a dynamic simulation model that captures the key components of a win-maximising sporting league, including the amateur player draft, draft choice error, player productivity, and between-team competition, to explore how competitive balance and incentives to under-perform vary according to league characteristics. We find reverse-order drafts can lead to some teams cycling between success and failure and to other teams being stuck in mid-ranking positions for extended periods of time. We also find that an incentive for teams to tank exists, but that this incentive decreases (i) as uncertainty in the ability to determine quality players in the draft increases, (ii) as the number of teams in the league reduces, (iii) as team size decreases, and (iv) as the number of teams adopting a tanking strategy increases. Simulation models can be used to explore complex stochastic dynamic systems such as sports leagues, where managers face difficult decisions regarding the structure of their league and the desire to maintain competitive balance. PMID:24312243

  18. Annual Report: 2010-2011 Storm Season Sampling For NON-DRY DOCK STORMWATER MONITORING FOR PUGET SOUND NAVAL SHIPYARD, BREMERTON, WA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brandenberger, Jill M.; Metallo, David; Johnston, Robert K.

    2012-09-01

    This interim report summarizes the stormwater monitoring conducted for non-dry dock outfalls in both the confined industrial area and the residential areas of Naval Base Kitsap within the Puget Sound Naval Shipyard (referred to as the Shipyard). This includes the collection, analyses, and descriptive statistics for stormwater sampling conducted from November 2010 through April 2011. Seven stormwater basins within the Shipyard were sampled during at least three storm events to characterize non-dry dock stormwater discharges at selected stormwater drains located within the facility. This serves as the Phase I component of the project and Phase II is planned for themore » 2011-2012 storm season. These data will assist the Navy, USEPA, Ecology and other stakeholders in understanding the nature and condition of stormwater discharges from the Shipyard and inform the permitting process for new outfall discharges. The data from Phase I was compiled with current stormwater data available from the Shipyard, Sinclair/Dyes Inlet watershed, and Puget Sound in order to support technical investigations for the Draft NPDES permit. The permit would require storm event sampling at selected stormwater drains located within the Shipyard. However, the data must be considered on multiple scales to truly understand potential impairments to beneficial uses within Sinclair and Dyes Inlets.« less

  19. A Process Evaluation of Project Developmental Continuity. Interim Report II, Part B: Recommendations for Measuring Program Impact.

    ERIC Educational Resources Information Center

    Love, John M.; And Others

    This report presents recommendations for measures to be used in assessing the impact of Project Developmental Continuity (PDC). Chapter I reviews the purpose of the impact study and presents the basic considerations guiding the selection of measures. Chapter II describes the review process that led to the final recommendations. Chapter III…

  20. Partnerships for Reform: Changing Teacher Preparation through the Title II HEA Partnership Program: Interim Report. PPSS 2003-8

    ERIC Educational Resources Information Center

    US Department of Education, 2004

    2004-01-01

    The Title II Higher Education Amendment (HEA) Partnership Grants Program provides grants to fund partnerships among colleges of education, schools of arts and sciences and local school districts in high-need areas. The goal of the program is to improve student achievement by increasing the quality of teachers. This evaluation examined the extent…

  1. Design/Drafting (Graphic Communications). Industrial Arts, Senior High--Level II. North Dakota Senior High Industrial Arts Curriculum Guides.

    ERIC Educational Resources Information Center

    Poehls, Eddie; And Others

    This course guide for a design/drafting course is one of four developed for the graphic communications area in the North Dakota senior high industrial arts education program. (Eight other guides are available for two other areas of Industrial Arts--energy/power and production.) Part 1 provides such introductory information as a definition and…

  2. Soil stabilization field trial : interim report II.

    DOT National Transportation Integrated Search

    2002-02-01

    Shrinkage cracks in cement-stabilized bases/subbase can be alleviated by specifying the right cement dosage, or by other additives/procedures that suppress crack susceptibility. A field trial of six 1000 ft sections to investigate several alternative...

  3. 10 CFR 851.22 - Hazard prevention and abatement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... controls that limit worker exposures; and (4) Personal protective equipment. (c) Contractors must address hazards when selecting or purchasing equipment, products, and services. ... the risk to workers; (ii) Implement interim protective measures pending final abatement; and (iii...

  4. 10 CFR 851.22 - Hazard prevention and abatement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... controls that limit worker exposures; and (4) Personal protective equipment. (c) Contractors must address hazards when selecting or purchasing equipment, products, and services. ... the risk to workers; (ii) Implement interim protective measures pending final abatement; and (iii...

  5. NASA Standard for Models and Simulations: Credibility Assessment Scale

    NASA Technical Reports Server (NTRS)

    Babula, Maria; Bertch, William J.; Green, Lawrence L.; Hale, Joseph P.; Moser, Gary E.; Steele, Martin J.; Sylvester, Andre; Woods, Jody

    2008-01-01

    As one of its many responses to the 2003 Space Shuttle Columbia accident, NASA decided to develop a formal standard for models and simulations (M and S)ii. Work commenced in May 2005. An interim version was issued in late 2006. This interim version underwent considerable revision following an extensive Agency-wide review in 2007 along with some additional revisions as a result of the review by the NASA Engineering Management Board (EMB) in the first half of 2008. Issuance of the revised, permanent version,hereafter referred to as the M and S Standard or just the Standard, occurred in July 2008.

  6. Interim reliability-evaluation program: analysis of the Browns Ferry, Unit 1, nuclear plant. Appendix C - sequence quantification

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mays, S.E.; Poloski, J.P.; Sullivan, W.H.

    1982-07-01

    This report describes a risk study of the Browns Ferry, Unit 1, nuclear plant. The study is one of four such studies sponsored by the NRC Office of Research, Division of Risk Assessment, as part of its Interim Reliability Evaluation Program (IREP), Phase II. This report is contained in four volumes: a main report and three appendixes. Appendix C generally describes the methods used to estimate accident sequence frequency values. Information is presented concerning the approach, example collection, failure data, candidate dominant sequences, uncertainty analysis, and sensitivity analysis.

  7. Proposed Class II Permit MI-035-2R-0034: Fact Sheet and Draft Permit

    EPA Pesticide Factsheets

    EPA plans to issue a Class II permit for Muskegon Development Company’s Holcomb 1-22 well in Clare County, Mich. Document page contains factsheet about proposed UIC permit for Holcomb 1-22 well to Muskegon Development Company.

  8. California Diploma Project Technical Report II: Alignment Study--Alignment Study of the Health Sciences and Medical Technology Draft Standards and California's Exit Level Common Core State Standards

    ERIC Educational Resources Information Center

    McGaughy, Charis; de Gonzalez, Alicia

    2012-01-01

    The California Department of Education is in the process of revising the Career and Technical Education (CTE) Model Curriculum Standards. The Educational Policy Improvement Center (EPIC) conducted an investigation of the draft version of the Health Sciences and Medical Technology Standards (Health Science). The purpose of the study is to…

  9. Oral Assessment Kit, Levels II & III. Draft.

    ERIC Educational Resources Information Center

    Agrelo-Gonzalez, Maria; And Others

    The assessment packet includes a series of oral tests to help develop speaking as an integral part of second language instruction at levels II and III. It contains: 8 mini-tests for use at level II; 9 mini-tests for use at level III; a rating scale and score sheet masters for evaluating performance on these tests; and a collection of suggested…

  10. LED street lighting evaluation -- phase II : LED specification and life-cycle cost analysis.

    DOT National Transportation Integrated Search

    2015-01-01

    Phase II of this study focused on developing a draft specification for LED luminaires to be used by IDOT : and a life-cycle cost analysis (LCCA) tool for solid state lighting technologies. The team also researched the : latest developments related to...

  11. 78 FR 1574 - Regulatory Agenda

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-08

    ... Infusion Pumps. 281 Requirements for the 0910-AG59 Testing and Reporting of Tobacco Product Constituents... Use Devices: Issuance of Draft Special Controls Guidance for Infusion Pumps Legal Authority: 21 U.S.C... proposing to amend the classification of infusion pumps from class II (performance standards) to class II...

  12. Evaluation of Gust and Draft Velocities from Flights of P-61C Airplanes Within Thunderstorms September 17, 1946 to September 18, 1946 at Orlando, Florida

    NASA Technical Reports Server (NTRS)

    Tolefson, H. B.

    1947-01-01

    The results obtained from measurements of gust velocities, draft velocities, and ambient-air temperature within thunderstorms for the period September 17, 1946 to September 18, 1946 at Orlando, Fla. are presented herein. These data are summarized in tables I, II, and III, respectively, and are of the type presented in reference 1 for previous flights.

  13. 40 CFR 80.141 - Interim detergent gasoline program.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... considered acceptable for demonstration of IVD control performance. Examples of acceptable test procedures... carburetor deposits. Examples of acceptable test procedures for demonstration of carburetor deposit control... ultimate consumer; (ii) All additized post-refinery component (PRC); and (iii) All detergent additives sold...

  14. 40 CFR 80.141 - Interim detergent gasoline program.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... considered acceptable for demonstration of IVD control performance. Examples of acceptable test procedures... carburetor deposits. Examples of acceptable test procedures for demonstration of carburetor deposit control... ultimate consumer; (ii) All additized post-refinery component (PRC); and (iii) All detergent additives sold...

  15. 40 CFR 80.141 - Interim detergent gasoline program.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... considered acceptable for demonstration of IVD control performance. Examples of acceptable test procedures... carburetor deposits. Examples of acceptable test procedures for demonstration of carburetor deposit control... ultimate consumer; (ii) All additized post-refinery component (PRC); and (iii) All detergent additives sold...

  16. 40 CFR 80.141 - Interim detergent gasoline program.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... considered acceptable for demonstration of IVD control performance. Examples of acceptable test procedures... carburetor deposits. Examples of acceptable test procedures for demonstration of carburetor deposit control... ultimate consumer; (ii) All additized post-refinery component (PRC); and (iii) All detergent additives sold...

  17. Texturing of concrete pavements : interim report No. 2.

    DOT National Transportation Integrated Search

    1976-09-01

    The purpose of this research study is to document and evaluate the findings of the Category II experimental concrete texturing project. Under this plan of experimental study, several texting techniques were tried and will be compared in order to dete...

  18. Field testing of hand-held infrared thermography, phase II TPF-5(247) interim report.

    DOT National Transportation Integrated Search

    2015-12-01

    This report describes research completed to develop and implement infrared thermography, a nondestructive evaluation (NDE) : technology for the condition assessment of concrete bridge components. The overall goal of this research was to develop new :...

  19. Maine Pure, MEU508524, Draft Permit

    EPA Pesticide Factsheets

    2015-09-29

    ... I orr m I I I I I I I I ' I II : I I ~ ' IInbsp; I ~, ' I !I.: .1: MANNOn\\\\ "l •-'~" I,<:.,J,_r-----r----- 1.4' ""'c:i) t 0 I i I I I -& ~ ...

  20. Superpave in-situ stress/strain investigation--phase II implementing (SISSI II) : draft report, evaluating the sensitivity of MEPDG to SISSI data.

    DOT National Transportation Integrated Search

    2009-01-01

    The objective of the sensitivity study was to evaluate the input parameters related to AC material properties, traffic, and climate that significantly or insignificantly influence the predicted performance for two specific SISSI flexible pavements: W...

  1. 78 FR 36698 - Microbiology Devices; Reclassification of Nucleic Acid-Based Systems for Mycobacterium tuberculosis

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-19

    ... specimens from class III (premarket approval) into class II (special controls). FDA is also issuing the draft special controls guideline entitled ``Class II Special Controls Guideline: Nucleic Acid-Based In... regulatory controls needed to provide reasonable assurance of their safety and effectiveness. The three...

  2. Draft genome and sequence variant data of the oomycete Pythium insidiosum strain Pi45 from the phylogenetically-distinct Clade-III.

    PubMed

    Kittichotirat, Weerayuth; Patumcharoenpol, Preecha; Rujirawat, Thidarat; Lohnoo, Tassanee; Yingyong, Wanta; Krajaejun, Theerapong

    2017-12-01

    Pythium insidiosum is a unique oomycete microorganism, capable of infecting humans and animals. The organism can be phylogenetically categorized into three distinct clades: Clade-I (strains from the Americas); Clade-II (strains from Asia and Australia), and Clade-III (strains from Thailand and the United States). Two draft genomes of the P. insidiosum Clade-I strain CDC-B5653 and Clade-II strain Pi-S are available in the public domain. The genome of P. insidiosum from the distinct Clade-III, which is distantly-related to the other two clades, is lacking. Here, we report the draft genome sequence of the P. insidiosum strain Pi45 (also known as MCC13; isolated from a Thai patient with pythiosis; accession numbers BCFM01000001-BCFM01017277) as a representative strain of the phylogenetically-distinct Clade-III. We also report a genome-scale data set of sequence variants (i.e., SNPs and INDELs) found in P. insidiosum (accessible online at the Mendeley database: http://dx.doi.org/10.17632/r75799jy6c.1).

  3. 76 FR 33726 - National Ocean Council; Strategic Action Plan Content Outlines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-09

    ...On July 19, 2010, President Obama signed Executive Order 13547 establishing a National Policy for the Stewardship of the Ocean, our Coasts, and the Great Lakes (``National Ocean Policy''). The National Ocean Policy provides an implementation strategy, which describes nine priority objectives that seek to address some of the most pressing challenges facing the ocean, our coasts, and the Great Lakes. The National Ocean Council is responsible for developing strategic action plans for each of the nine priority objectives. As a first step, Federal interagency writing teams have developed content outlines for each draft strategic action plan. The NOC is seeking public review and comment of these content outlines. The purpose of the draft content outlines (outlines) is to provide the public with an initial view of potential actions that could be taken to further the national priority objectives. As such, they are an interim step toward development of the first full draft of each strategic action plan. In developing the outlines, the writing teams were informed by the comments received during an initial public scoping period that closed on April 29. Each outline presents in bulleted form potential actions to further the particular priority objective. It describes the reasons for taking the action, expected outcomes and milestones, gaps and needs in science and technology, and the timeframe for completing the action. The outlines also provide an overview of the priority objective, greater context for the strategic action plan in implementing the National Ocean Policy, and an overview of the preparation of the plan . Public comments received on the outlines will be collated and posted on the NOC Web site. The comments on the outlines will inform the preparation of full draft strategic action plans, which will be released for public review in the fall of 2011, allowing additional opportunity for the public to provide comments. Final strategic action plans are expected to be completed by early 2012.

  4. Intercultural Pedagogies: An Interim Stocktaking.

    ERIC Educational Resources Information Center

    Reich, Hans H.

    1994-01-01

    Presents a survey of educational history specific to immigration in England, France, and West Germany after World War II. Concludes that intercultural pedagogics is passing through a severe crisis that can be surmounted only if previous insights are successfully integrated into fundamentally new developments. (CFR)

  5. 40 CFR 80.141 - Interim detergent gasoline program.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) “Carburetor Cleanliness Test Procedure, State-of-the-Art Summary, Report: 1973-1981”, Coordinating Research... ultimate consumer; (ii) All additized post-refinery component (PRC); and (iii) All detergent additives sold... who manufacture, supply, or transfer detergent additives or detergent-additized post-refinery...

  6. A Draft Science Management Plan for Returned Samples from Mars: Recommendations from the International Mars Architecture for the Return of Samples (iMARS) Phase II Working Group

    NASA Astrophysics Data System (ADS)

    Haltigin, T.; Lange, C.; Mugnuolo, R.; Smith, C.

    2018-04-01

    This paper summarizes the findings and recommendations of the International Mars Architecture for the Return of Samples (iMARS) Phase II Working Group, an international team comprising 38 members from 16 countries and agencies.

  7. 29 CFR 1918.62 - Miscellaneous auxiliary gear.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... appendix II to this part. A design safety factor of at least five shall be maintained for the common sizes... cranes, designed to be used with lesser wire rope safety factors; (ii) According to design factors in... pre-slung drafts. (3) Eye splices shall consist of at least three full tucks. Short splices shall...

  8. 29 CFR 1918.62 - Miscellaneous auxiliary gear.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... appendix II to this part. A design safety factor of at least five shall be maintained for the common sizes... cranes, designed to be used with lesser wire rope safety factors; (ii) According to design factors in... pre-slung drafts. (3) Eye splices shall consist of at least three full tucks. Short splices shall...

  9. Early Restoration | NOAA Gulf Spill Restoration

    Science.gov Websites

    Early Restoration Plan. On April 20, 2011 we reached an agreement with BP to start restoration planning draft plan for the third phase of early restoration in December 2013. We are considering your comments : All Phase III information and documents Phase II Useful Links: Phase II Early Restoration Plan &

  10. Communications for Lifelong Success I and II (Tech Prep English I and II). Pilot Test Materials for Pendleton High School, Pendleton, South Carolina. Draft.

    ERIC Educational Resources Information Center

    Turlington, Anita; And Others

    These instructional materials include six supplementary units for Tech Prep English I (grade 9) and six assignments for Tech Prep English II (grade 10). The Tech Prep English I units have these components: unit objectives, introduction, and follow-up exercises. Topics include goal setting, problem solving and decision making, listening and reading…

  11. Evaluation of Gust and Draft Velocities from Flights of P-61C Airplanes within Thunderstorms August 17, 1946 to August 19, 1946 at Orlando, Florida

    NASA Technical Reports Server (NTRS)

    Tolefson, H. B.

    1947-01-01

    Results obtained from gust and draft velocity measurements within thunderstorms for the period August 17, 1946 to August 19, 1946 at Orlando, Florida are presented herein. These data are summarized in tables I and II and are of the type presented in reference 1 for previous flights. Inspection of photo-observer records taken on the present flights indicated that mo ambient-air temperature data were obtained.

  12. Evaluation of Gust and Draft Velocities from Flights of P-61C Airplanes within Thunderstorms July 24, 1946 to August 6, 1946 at Orlando, Florida

    NASA Technical Reports Server (NTRS)

    Tolefson, Harold B.

    1947-01-01

    The results obtained from gust and draft velocity measurements within thunderstorms for the period July 24, 1946 to August 6, 1946 at Orlando, Florida are presented herein. These data are summarized in tables I and II and are of the type presented in reference 1 for previous flights. In two thunderstorm traverses, indications of ambient-air temperature were obtained from photo-observer records. These data are summarized in table III.

  13. Conditional power and predictive power based on right censored data with supplementary auxiliary information.

    PubMed

    Sun, Libo; Wan, Ying

    2018-04-22

    Conditional power and predictive power provide estimates of the probability of success at the end of the trial based on the information from the interim analysis. The observed value of the time to event endpoint at the interim analysis could be biased for the true treatment effect due to early censoring, leading to a biased estimate of conditional power and predictive power. In such cases, the estimates and inference for this right censored primary endpoint are enhanced by incorporating a fully observed auxiliary variable. We assume a bivariate normal distribution of the transformed primary variable and a correlated auxiliary variable. Simulation studies are conducted that not only shows enhanced conditional power and predictive power but also can provide the framework for a more efficient futility interim analysis in terms of an improved accuracy in estimator, a smaller inflation in type II error and an optimal timing for such analysis. We also illustrated the new approach by a real clinical trial example. Copyright © 2018 John Wiley & Sons, Ltd.

  14. Testing REACH draft technical guidance notes for conducting chemical safety assessments-the experience of a downstream user of a preparation.

    PubMed

    Gade, Anne Lill; Ovrebø, Steinar; Hylland, Ketil

    2008-07-01

    The goal of REACH is the safe use of chemicals. This study examines the efficiency and usefulness of two draft technical guidance notes in the REACH Interim Project 3.2-2 for the development of the chemical safety report and exposure scenarios. A case study was carried out for a paint system for protection of structural steel. The focuses of the study were risk assessment of preparations based on Derived No Effect Level (DNEL) and Predicted No Effect Concentrations (PNEC) and on effective and accurate communication in the supply chain. Exposure scenarios and generic descriptions of uses, risk management measures, and exposure determinants were developed. The study showed that communication formats, software tools, and guidelines for chemical risk assessment need further adjustment to preparations and real-life situations. Web platforms may simplify such communication. The downstream formulator needs basic substance data from the substance manufacturer during the pre-registration phase to develop exposure scenarios for preparations. Default values need to be communicated in the supply chain because these were critical for the derivation of applicable risk management demands. The current guidelines which rely on the available toxicological knowledge are insufficient to advise downstream users on how to develop exposure scenarios for preparations.

  15. Locomotive cab design development. volume III: design application analysis - Interim report

    DOT National Transportation Integrated Search

    1976-10-01

    In Volume II of this service of reports on Locomotive Cab Design Development, changes were recommended in the layout and equipment content of locomotive cabs. This report studies the impact of these changes on the interface of the cab with the rest o...

  16. Report of Programme Commission II (Natural Sciences), Annex - Recommendations.

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Paris (France). General Conference.

    As the second part of the report of the Programme Commission II, a summary of recommendations on plans for natural sciences and their applications is presented in this document. Resolutions and budgetary appropriations are two major concerns in the document. The topics are related to the 1973-74 draft program and budget, the 1973-78 draft…

  17. pH Dependent Spin State Population and 19F NMR Chemical Shift via Remote Ligand Protonation in an Iron(II) Complex (Postprint)

    DTIC Science & Technology

    2017-12-11

    AFRL-RX-WP-JA-2017-0501 pH- DEPENDENT SPIN STATE POPULATION AND 19F NMR CHEMICAL SHIFT VIA REMOTE LIGAND PROTONATION IN AN IRON(II...From - To) 16 November 2017 Interim 24 January 2014 – 16 October 2017 4. TITLE AND SUBTITLE PH- DEPENDENT SPIN STATE POPULATION AND 19F NMR CHEMICAL...dx.doi.org/10.1039/C7CC08099A 14. ABSTRACT (Maximum 200 words) An FeII complex that features a pH- dependent spin state population, by virtue of a

  18. 76 FR 44282 - Defense Federal Acquisition Regulation Supplement; Prohibition on Interrogation of Detainees by...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-25

    ..., 2011. Three respondents provided comments on the interim rule. II. Discussion and Analysis A summary of... Comment: Three respondents provided comments supporting the idea that establishing an effective system of... by reiterating this language in the DFARS. C. Clarity of Definitions Comment: One respondent...

  19. 40 CFR 57.302 - Performance level of interim constant controls.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... exceed the following: (i) For sulfuric acid plants on copper smelters, 12-hour running average; (ii) For sulfuric acid plants on lead smelters, 6-hour running average; (iii) For sulfuric acid plants on zinc... limitation shall take into account unavoidable catalyst deterioration in sulfuric acid plants, but may...

  20. 75 FR 21695 - Interim Notice of Funding Availability for the Department of Transportation's National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-26

    ... district plans, and other strategies, including land acquisition, designed to create walkable, mixed-use... million of the available TIGER II funds for the planning, preparation, or design of Eligible Projects... manner that will be sustainable for generations to come. Therefore, for projects designed to enhance...

  1. Guidelines Series Interim Guidelines For The Interpretation Of ...

    EPA Pesticide Factsheets

    ... t; u.,» TUi 1 ' • } -/I (!;S f •">. Cll fff '"tf >.'.• f i. J. Ir,- HI-.nrral r .r - ti.o.1^ i "-.,: iui'.iv fcr Crt',-;i 1 i;,? a 1 ' ;• i v.- I use-i 1 • rqcly it.".'' t : • ii _ , - / f ...

  2. Northeast Artificial Intelligence Consortium Annual Report 1987. Volume 2, Part B. Discussing, Using, and Recognizing Plans

    DTIC Science & Technology

    1989-03-01

    1978. Williams. B.C. Qualitative Analysis of MOS Circuits. Artificial Inteligence . 1984. 24.. Wilson. K. From Association to Structure. Amsterdam:North...D-A208 378 RADC-TR-88-324, Vol II (of nine), Part B Interim Report March 1969 4. NORTHEAST ARTIFICIAL INTELLIGENCE CONSORTIUM ANNUAL REPORT 1987...II (of nine), Part B 6a. NAME OF PERFORMING ORGANIZATION 6b. OFFICE SYMBOL 7a. NAME OF MONITORING ORGANIZATION Northeast Artificial (ff ’aolicbl

  3. tetrahydrocannabinol (delta-9-THC)] in Schedule II. Final rule.

    PubMed

    2017-11-22

    This final rule adopts without changes an interim final rule with request for comments published in the Federal Register on March 23, 2017. On July 1, 2016, the U.S. Food and Drug Administration (FDA) approved a new drug application for Syndros, a drug product consisting of dronabinol [(-)-delta-9-trans-tetrahydrocannabinol (delta-9-THC)] oral solution. The Drug Enforcement Administration (DEA) maintains FDA-approved products of oral solutions containing dronabinol in schedule II of the Controlled Substances Act.

  4. 12 CFR 551.40 - What definitions apply to this part?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... traded on one or more national securities exchanges; or (ii) For which quotations are disseminated... not include currency; any note, draft, bill of exchange, or banker's acceptance which has a maturity...

  5. New Bedford, Remedial Action Master Plan: Draft Report, January 24, 1983

    EPA Pesticide Factsheets

    2012-04-22

    ... r E!,!-; I:, in <;i r y ) 1.5 \\\\ •• 1 b F CI!) <• i. n I! «:i I: t. curn Sed i. me i'i t,ii ( LuCi we r liliii t. iihi if y) 1. li i!-] I! ... i T IOUTH V' " ;1 „ ^jt^ ^ 1 li f""\\* f '" i , "') v|s ...

  6. Veterans' Reflections - World War II to Desert Storm

    Science.gov Websites

    Do' WASHINGTON, Nov. 10, 2010 - Buster Adams worked for the Army Signal Corps when he was drafted . Story Bill Sumner A Life of Service WASHINGTON, Nov. 8, 2010 - The day Bill Sumner graduated from high missed out on his chance to serve in World War II when he was mistakenly diagnosed with tuberculosis the

  7. Two-stage phase II oncology designs using short-term endpoints for early stopping.

    PubMed

    Kunz, Cornelia U; Wason, James Ms; Kieser, Meinhard

    2017-08-01

    Phase II oncology trials are conducted to evaluate whether the tumour activity of a new treatment is promising enough to warrant further investigation. The most commonly used approach in this context is a two-stage single-arm design with binary endpoint. As for all designs with interim analysis, its efficiency strongly depends on the relation between recruitment rate and follow-up time required to measure the patients' outcomes. Usually, recruitment is postponed after the sample size of the first stage is achieved up until the outcomes of all patients are available. This may lead to a considerable increase of the trial length and with it to a delay in the drug development process. We propose a design where an intermediate endpoint is used in the interim analysis to decide whether or not the study is continued with a second stage. Optimal and minimax versions of this design are derived. The characteristics of the proposed design in terms of type I error rate, power, maximum and expected sample size as well as trial duration are investigated. Guidance is given on how to select the most appropriate design. Application is illustrated by a phase II oncology trial in patients with advanced angiosarcoma, which motivated this research.

  8. Evaluation of Gust and Draft Velocities from Flights of P-61C Airplanes within Thunderstorms: August 23, 1946 to September 4, 1946 at Orlando, Florida

    NASA Technical Reports Server (NTRS)

    Tolefson, H. B.

    1946-01-01

    This report presents the results obtained from gust and draft velocity measurements within thunderstorms for the period August 23, 1946 to September 4, 1946 at Orlando, Florida. These data are summarized in tables I end II and are of the type presented in reference 1 for previous flights. In several of the surveys, indications of ambient air temperature were obtained from photo-observer records. These data are summarized in table III.

  9. Evaluation of Gust and Draft Velocities from Flights of P-61C Airplanes within Thunderstorms July 22, 1946 to July 23, 1946 at Orlando, Florida

    NASA Technical Reports Server (NTRS)

    Tolefson, H. B.

    1947-01-01

    The results obtained from measurements of gust and draft velocities within thunderstorms for the period July 22, 1946 to July 23, 1946 at Orlando, Florida, are presented herein. These data are summarized in tables I and II, respectively, and are of the type presented in reference 1 for previous flights. Inspection of photo-observer records for the flights indicated that no data on ambient air temperature variations within thunderstorms were obtained.

  10. Working draft of the FDA GMP final rule (Part II).

    PubMed

    Donawa, M E

    1995-11-01

    Part I of this two-part series provided information on the proposed design control provisions of the US Food and Drug Administration's (FDA) working draft of the final rule for new good manufacturing practice regulations for medical devices. The final rule could be published in April or May 1996. It would be in force 180 days after the date of publication. Design control requirements may become effective some months later. This article describes recommended modifications of three provisions that have been intensely discussed during recent FDA-sponsored public meetings.

  11. Results of the first interim analysis of the RAPPER II trial in patients with spinal cord injury: ambulation and functional exercise programs in the REX powered walking aid.

    PubMed

    Birch, Nick; Graham, Jon; Priestley, Tom; Heywood, Chris; Sakel, Mohamed; Gall, Angela; Nunn, Andrew; Signal, Nada

    2017-06-19

    The RAPPER II study investigates the feasibility, safety and acceptability of using the REX self-stabilising robotic exoskeleton in people with spinal cord injury (SCI) who are obligatory wheelchair users. Feasibility is assessed by the completion of transfer into the REX device, competency in achieving autonomous control and completion of upper body exercise in an upright position in the REX device. Safety is measured by the occurrence of serious adverse events. Device acceptability is assessed with a user questionnaire. RAPPER II is a prospective, multi-centre, open label, non-randomised, non-comparative cohort study in people with SCI recruited from neurological rehabilitation centres in the United Kingdom, Australia and New Zealand. This is the planned interim report of the first 20 participants. Each completed a transfer into the REX, were trained to achieve machine control and completed Timed Up and Go (TUG) tests as well as upper body exercises in standing in a single first time session. The time to achieve each task as well as the amount of assistance required was recorded. After finishing the trial tasks a User Experience questionnaire, exploring device acceptability, was completed. All participants could transfer into the REX. The mean transfer time was 439 s. Nineteen completed the exercise regime. Eighteen could achieve autonomous control of the REX, 17 of whom needed either no assistance or the help of just one therapist. Eighteen participants completed at least one TUG test in a mean time of 313 s, 15 with the assistance of just one therapist. The questionnaire demonstrated high levels of acceptability amongst users. There were no Serious Adverse Events. This first interim analysis of RAPPER II shows that it is feasible and safe for people with SCI to use the REX powered assisted walking device to ambulate and exercise in. Participants with tetraplegia and paraplegia could walk and perform a functional exercise program when standing needing only modest levels of assistance in most cases. User acceptability was high. ClinicalTrials.gov , NCT02417532 . Registered 11 April 2015.

  12. Interim reliability-evaluation program: analysis of the Browns Ferry, Unit 1, nuclear plant. Appendix B - system descriptions and fault trees

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mays, S.E.; Poloski, J.P.; Sullivan, W.H.

    1982-07-01

    This report describes a risk study of the Browns Ferry, Unit 1, nuclear plant. The study is one of four such studies sponsored by the NRC Office of Research, Division of Risk Assessment, as part of its Interim Reliability Evaluation Program (IREP), Phase II. This report is contained in four volumes: a main report and three appendixes. Appendix B provides a description of Browns Ferry, Unit 1, plant systems and the failure evaluation of those systems as they apply to accidents at Browns Ferry. Information is presented concerning front-line system fault analysis; support system fault analysis; human error models andmore » probabilities; and generic control circuit analyses.« less

  13. 40 CFR 799.9346 - TSCA 90-day inhalation toxicity.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) should be used for each test group. (B) If interim sacrifices are planned, the number of animals shall be... substantially alter the chemical or toxicological properties of the test substance. (ii) One lot of the test... control group. Except for treatment with the test substance, animals in the control group shall be handled...

  14. 40 CFR 799.9346 - TSCA 90-day inhalation toxicity.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) should be used for each test group. (B) If interim sacrifices are planned, the number of animals shall be... substantially alter the chemical or toxicological properties of the test substance. (ii) One lot of the test... control group. Except for treatment with the test substance, animals in the control group shall be handled...

  15. 40 CFR 799.9346 - TSCA 90-day inhalation toxicity.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) should be used for each test group. (B) If interim sacrifices are planned, the number of animals shall be... substantially alter the chemical or toxicological properties of the test substance. (ii) One lot of the test... control group. Except for treatment with the test substance, animals in the control group shall be handled...

  16. 40 CFR 799.9346 - TSCA 90-day inhalation toxicity.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) should be used for each test group. (B) If interim sacrifices are planned, the number of animals shall be... substantially alter the chemical or toxicological properties of the test substance. (ii) One lot of the test... control group. Except for treatment with the test substance, animals in the control group shall be handled...

  17. 40 CFR 799.9346 - TSCA 90-day inhalation toxicity.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) should be used for each test group. (B) If interim sacrifices are planned, the number of animals shall be... substantially alter the chemical or toxicological properties of the test substance. (ii) One lot of the test... control group. Except for treatment with the test substance, animals in the control group shall be handled...

  18. An Automated Cloud Observation System (ACOS).

    DTIC Science & Technology

    1980-12-17

    IQ 4. TITLE (and SubliIII.J 5- TYPE OF REPORT & PERIOD COVERED AN.JUTOXMATrD A LOUD OBSERVATION Scientific . Interim. SYSTEM (ALLIS) 6 PERFORMING ORG...p oci -dIi IV ( ( )S). . hhe 6 lists the percentage of agreement realizied by -:~ tc thc fiftt en metthods (I’ p touping ceilomieter t’ ata (see Ta

  19. 76 FR 60959 - Self-Regulatory Organizations; Municipal Securities Rulemaking Board; Notice of Withdrawal of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-30

    ...-Regulatory Organizations; Municipal Securities Rulemaking Board; Notice of Withdrawal of Proposed New Rule A... Commission (the ``Commission'') a proposed rule change pursuant to Section 19(b)(1) of the Securities... municipal advisor assessments, and (ii) new Form A-11-Interim. Notice of the proposed rule change was...

  20. Studies on the exercise physiology of draft horses performed in Japan during the 1950s and 1960s.

    PubMed

    Hiraga, Atsushi; Sugano, Shigeru

    2017-01-01

    Although the total number of horses raised in Japan dramatically decreased after World War II, because draft horses were still used for farm work in paddy fields and on farms during the period of the 1950s and 1960s, a performance test for selecting better draft horses was needed. In order to determine the most suitable size of draft horses for Japanese farm conditions, the working power of horses weighing from 185 to 622 kg was evaluated by performing an endurance test, several kinds of working power tests, and maximum pulling power tests. Oxygen consumption during draft exercise was measured by the Douglas bag method in order to evaluate effects of draft workload under the conditions of different types of work (14- and 18-cm plow depths, cultivator, and tillage), traction methods (shoulder traction, shoulder-trunk traction, and chest-trunk traction), walking speeds (40, 60, 80, 100, and 120 m/min), and depths of water (0, 18, 36, and 54 cm) on energy expenditure. The relationship between energy consumption and pulse rate during exercise was also evaluated. A study of a performance test for draft horses was conducted to establish a new approach for evaluating draft horse performance using heart rate as an index. For this study, a beat meter for measuring heart rate was developed, and experimental protocols were used to evaluate the relationship between heart rate and workload. Although the research results obtained from these studies do not have particular relevance in the current day, these studies are valuable for understanding the history of equine exercise physiology in Japan.

  1. Studies on the exercise physiology of draft horses performed in Japan during the 1950s and 1960s

    PubMed Central

    HIRAGA, Atsushi; SUGANO, Shigeru

    2017-01-01

    ABSTRACT Although the total number of horses raised in Japan dramatically decreased after World War II, because draft horses were still used for farm work in paddy fields and on farms during the period of the 1950s and 1960s, a performance test for selecting better draft horses was needed. In order to determine the most suitable size of draft horses for Japanese farm conditions, the working power of horses weighing from 185 to 622 kg was evaluated by performing an endurance test, several kinds of working power tests, and maximum pulling power tests. Oxygen consumption during draft exercise was measured by the Douglas bag method in order to evaluate effects of draft workload under the conditions of different types of work (14- and 18-cm plow depths, cultivator, and tillage), traction methods (shoulder traction, shoulder-trunk traction, and chest-trunk traction), walking speeds (40, 60, 80, 100, and 120 m/min), and depths of water (0, 18, 36, and 54 cm) on energy expenditure. The relationship between energy consumption and pulse rate during exercise was also evaluated. A study of a performance test for draft horses was conducted to establish a new approach for evaluating draft horse performance using heart rate as an index. For this study, a beat meter for measuring heart rate was developed, and experimental protocols were used to evaluate the relationship between heart rate and workload. Although the research results obtained from these studies do not have particular relevance in the current day, these studies are valuable for understanding the history of equine exercise physiology in Japan. PMID:28400701

  2. Basic Parameters of Metal Behavior under High Rate Forming

    DTIC Science & Technology

    1962-03-01

    1ii PHOTOGRAPH THIS SHEET II LEVELr• At-ký W •I)-_) -N INVENTORY z DOCUMENT IDENTIFICATION may. 6•t S]/ tp i - 0~o- o’•5,,? 3 ’ \\NAL- TR-/I. -a I .. ~1...TR 111.2/20- 3 BASIC PARAMETERS OF METAL BEHAVIOUR "> UNDER HIGH RATE FORMING L L j Fourth Interim Report to ell- L’,I I U. S. ARMY MATERIALS...RESEARCH AGENCY 1• I iiC::Ur:ui i 1,,i .:1 ’•:, 1 r/ n od I P,101c rolcso. Filing Subjects: I. Explosive forming 2. Dynamic behavior of metals 3 . High rate

  3. Combined Modality Treatment for PET-Positive Non-Hodgkin Lymphoma: Favorable Outcomes of Combined Modality Treatment for Patients With Non-Hodgkin Lymphoma and Positive Interim or Postchemotherapy FDG-PET

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Halasz, Lia M.; Jacene, Heather A.; Catalano, Paul J.

    2012-08-01

    Purpose: To evaluate outcomes of patients treated for aggressive non-Hodgkin lymphoma (NHL) with combined modality therapy based on [{sup 18}F]fluoro-2-deoxy-2-D-glucose positron emission tomography (FDG-PET) response. Methods and Materials: We studied 59 patients with aggressive NHL, who received chemotherapy and radiation therapy (RT) from 2001 to 2008. Among them, 83% of patients had stage I/II disease. Patients with B-cell lymphoma received R-CHOP (rituximab, cyclophosphamide, doxorubicin, vincristine, and prednisone)-based chemotherapy, and 1 patient with anaplastic lymphoma kinase-negative anaplastic T-cell lymphoma received CHOP therapy. Interim and postchemotherapy FDG-PET or FDG-PET/computed tomography (CT) scans were performed for restaging. All patients received consolidated involved-field RT.more » Median RT dose was 36 Gy (range, 28.8-50 Gy). Progression-free survival (PFS) and local control (LC) rates were calculated with and without a negative interim or postchemotherapy FDG-PET scan. Results: Median follow-up was 46.5 months. Thirty-nine patients had negative FDG-PET results by the end of chemotherapy, including 12 patients who had a negative interim FDG-PET scan and no postchemotherapy PET. Twenty patients were FDG-PET-positive, including 7 patients with positive interim FDG-PET and no postchemotherapy FDG-PET scans. The 3-year actuarial PFS rates for patients with negative versus positive FDG-PET scans were 97% and 90%, respectively. The 3-year actuarial LC rates for patients with negative versus positive FDG-PET scans were 100% and 90%, respectively. Conclusions: Patients who had a positive interim or postchemotherapy FDG-PET had a PFS rate of 90% at 3 years after combined modality treatment, suggesting that a large proportion of these patients can be cured with consolidated RT.« less

  4. Interim heterogeneity changes measured using entropy texture features on T2-weighted MRI at 3.0 T are associated with pathological response to neoadjuvant chemotherapy in primary breast cancer.

    PubMed

    Henderson, Shelley; Purdie, Colin; Michie, Caroline; Evans, Andrew; Lerski, Richard; Johnston, Marilyn; Vinnicombe, Sarah; Thompson, Alastair M

    2017-11-01

    To investigate whether interim changes in hetereogeneity (measured using entropy features) on MRI were associated with pathological residual cancer burden (RCB) at final surgery in patients receiving neoadjuvant chemotherapy (NAC) for primary breast cancer. This was a retrospective study of 88 consenting women (age: 30-79 years). Scanning was performed on a 3.0 T MRI scanner prior to NAC (baseline) and after 2-3 cycles of treatment (interim). Entropy was derived from the grey-level co-occurrence matrix, on slice-matched baseline/interim T2-weighted images. Response, assessed using RCB score on surgically resected specimens, was compared statistically with entropy/heterogeneity changes and ROC analysis performed. Association of pCR within each tumour immunophenotype was evaluated. Mean entropy percent differences between examinations, by response category, were: pCR: 32.8%, RCB-I: 10.5%, RCB-II: 9.7% and RCB-III: 3.0%. Association of ultimate pCR with coarse entropy changes between baseline/interim MRI across all lesions yielded 85.2% accuracy (area under ROC curve: 0.845). Excellent sensitivity/specificity was obtained for pCR prediction within each immunophenotype: ER+: 100%/100%; HER2+: 83.3%/95.7%, TNBC: 87.5%/80.0%. Lesion T2 heterogeneity changes are associated with response to NAC using RCB scores, particularly for pCR, and can be useful across all immunophenotypes with good diagnostic accuracy. • Texture analysis provides a means of measuring lesion heterogeneity on MRI images. • Heterogeneity changes between baseline/interim MRI can be linked with ultimate pathological response. • Heterogeneity changes give good diagnostic accuracy of pCR response across all immunophenotypes. • Percentage reduction in heterogeneity is associated with pCR with good accuracy and NPV.

  5. 75 FR 29352 - Draft Guidance for Industry on Data Elements for Submission of Veterinary Adverse Event Reports...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-25

    ... filling out form FDA 1932, ``Veterinary Adverse Drug Reaction, Lack of Effectiveness, Product Defect... Drug Reaction, Lack of Effectiveness, Product Defect Report.'' II. Significance of Guidance This level...

  6. Experiences with an adaptive design for a dose-finding study in patients with osteoarthritis.

    PubMed

    Miller, Frank; Björnsson, Marcus; Svensson, Ola; Karlsten, Rolf

    2014-03-01

    Dose-finding studies in non-oncology areas are usually conducted in Phase II of the development process of a new potential medicine and it is key to choose a good design for such a study, as the results will decide if and how to proceed to Phase III. The present article has focus on the design of a dose-finding study for pain in osteoarthritis patients treated with the TRPV1 antagonist AZD1386. We describe different design alternatives in the planning of this study, the reasoning for choosing the adaptive design and experiences with conduct and interim analysis. Three alternatives were proposed: one single dose-finding study with parallel design, a programme with a smaller Phase IIa study followed by a Phase IIb dose-finding study, and an adaptive dose-finding study. We describe these alternatives in detail and explain why the adaptive design was chosen for the study. We give insights in design aspects of the adaptive study, which need to be pre-planned, like interim decision criteria, statistical analysis method and setup of a Data Monitoring Committee. Based on the interim analysis it was recommended to stop the study for futility since AZD1386 showed no significant pain decrease based on the primary variable. We discuss results and experiences from the conduct of the study with the novel design approach. Huge cost savings have been done compared to if the option with one dose-finding design for Phase II had been chosen. However, we point out several challenges with this approach. Copyright © 2014 Elsevier Inc. All rights reserved.

  7. Military Fuels Refined from Paraho-II Shale Oil.

    DTIC Science & Technology

    1981-03-01

    FUELS REFINED O FROM PARAHO-II SHALE OIL INTERIM REPORT AFLRL No. 131 4!t by J.N. Bowden E.C. Owens D.W. Naegeli L.L. Stavinoha U.S. Army Fuels and...J.N./Bowden, E.C. /Owens, D.W./ Naegeli / DAAK70-78-C-0001 € L.L. Stavinoha DAAK70-80-C-0001 V 9 PERFORMING ORGANIZATION NAME AND ADDRESSES J0...Combustor Design and Oper- ating Conditions," Combustion Science and Technology, 19, 119, 1979. 16. Moses, C.A., and Naegeli , D.W., "Fuel Property

  8. Louisiana Coastal Area, Louisiana. Freshwater Diversion to Barataria and Breton Sound Basins. Feasibility Study. Volume 1. Draft Main Report. Draft Environmental Impact Statement.

    DTIC Science & Technology

    1984-09-01

    and shellfish that depend on these organisms would increase. Sport fishing and hunting is related to availability of fish and wild - life resources...colaiLivuly poor quality of the Misissippi R<ivyer wiite ,r oi Lit 1 c i vi iin wate bodil s aud as socia ted fish 6 id wild Ii e resolnrces; ind( ?h pot it...zone between fresh and brackish marsh. Common vegetation in this type includes wiregrass, deerpea, bulltongue, wild millet, bullwhip, and sawgrass. A

  9. The Sound and Video Library: An Interim Report on an Experiment. Melanges Pedagogiques, 1976.

    ERIC Educational Resources Information Center

    Riley, P.; Zoppis, C.

    An experimental sound- and video-library has recently been established by the Centre de Recherches et d'Applications Pedagogiques en Langues at the University of Nancy II. This article describes the functioning of the library system and gives a brief explanation of the underlying pedagogical principles which have guided the design, choice of…

  10. 77 FR 30359 - Defense Federal Acquisition Regulation Supplement: New Free Trade Agreement With Colombia (DFARS...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-22

    ... (see FAR 25.408). II. Discussion and Analysis This interim rule adds Colombia to the definition of...,000 for construction. Because the Colombia FTA construction threshold of $7,777,000 is the same as the... states that acquisitions that do not exceed $150,000 (with some exceptions) are automatically reserved...

  11. 75 FR 48388 - Self-Regulatory Organizations; Notice of Filing and Immediate Effectiveness of Proposed Rule...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-10

    ... 1094. The current pilot expires on September 15, 2010. The text of the proposed rule change is..., enumerated in full in Rule 1094(b)(ii): (i) The orders of the Sponsored Participant are binding in all... rules accordingly. In the interim, the Exchange believes that making its Rule 1094 permanent sends a...

  12. Institute for Developmental Studies Interim Progress Report. Part II: Research and Evaluation.

    ERIC Educational Resources Information Center

    Deutsch, Martin; And Others

    The Institute for Developmental Studies (IDS) is engaged in research aimed at specifying what the academic handicaps of deprived children are, what causes these handicaps, and what can be done to overcome them. This IDS report on their research and evaluation program is divided into two sections. The first, "Summaries of Basic Research, Applied…

  13. 75 FR 36506 - Final Rule Regarding Amendment of the Temporary Liquidity Guarantee Program To Extend the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-28

    ... percent or more of their assets. II. Interim Rule While the immediate financial crisis that led to the... facing community banks have intensified as the lingering consequences of the 2008 financial crisis and... financial crisis and recession are expected to persist for some time, especially as the magnitude of...

  14. Suitability of Shale Fuels for Army Generator Sets.

    DTIC Science & Technology

    1981-12-01

    J.N., Owens, E.C., Naegeli , D.W., and Stavinoha, L.L., "Mili- tary Fuels Refined From Paraho-II Shale Oil," Interim Report AFLRL No. 131, March 1981...Temperature Jet Fuel", NAPTC-PE-112, Naval Air Propulsion Center, Trenton, NJ, August 1977. 40. Moses, C. A. and Naegeli , D. W., "Fuel Property Effects

  15. Microarray analysis and draft genomes of two Escherichia coli 0157:H7 lineage II cattle isolates FRIK966 and FRIK2000 investigating lack of Shiga toxin expression

    USDA-ARS?s Scientific Manuscript database

    The existence of two separate lineages of Escherichia coli O157:H7 has previously been reported, and research indicates that lineage I might be more pathogenic towards human hosts than lineage II. We have previously shown that lineage I expresses higher levels of Shiga toxin 2 (Stx2). To evaluate w...

  16. GPS PPP-derived precipitable water vapor retrieval based on Tm/Ps from multiple sources of meteorological data sets in China

    NASA Astrophysics Data System (ADS)

    Zhang, Hongxing; Yuan, Yunbin; Li, Wei; Ou, Jikun; Li, Ying; Zhang, Baocheng

    2017-04-01

    Weighted mean temperature (Tm) and pressure (Ps) are two parameters of great relevance to precipitable water vapor (PWV) retrieval from global positioning system (GPS) data. However, information about the Tm and Ps cannot be available for those GPS stations that are not colocated with meteorological sensors. To investigate the optimal GPS-PWV retrieval method for China, two enhanced Tm models, GM-Tm (temperature dependent) and GH-Tm (temperature independent), are developed. Additionally, the potentials of the Ps data from the two reanalysis data sets, the National Centers for Environmental Prediction (NCEP)-Department of Energy (DOE) Reanalysis II (NCEP II) and ERA-Interim, and from the empirical model GPT2w for GPS-PWV retrieval are investigated over China. To evaluate the performances of multisources Tm and Ps data for GPS-PWV retrieval, GPS data (2011-2013) collected from 22 stations of the Crustal Movement Observation Network of China (CMONOC) were processed by using the precise point positioning (PPP) technique, estimating the zenith tropospheric delay (ZTD) so as to be subsequently converted to GPS-PWV. The retrieved GPS-PWVs are compared with their counterparts derived from NCEP II and radiosonde data over China. The results show that (1) the GM-Tm model consistently shows the highest accuracy (with root mean square error of 2.3 K), and the GH-Tm model should be selected when temperature observations are not available, and that (2) the performances of Ps from NCEP II and ERA-Interim differ marginally for GPS-PWV retrieval, and significant seasonal variations are found in the agreement between the GPS-PWVs and the PWVs derived from NCEP II and radiosonde data over China.

  17. History society launches journal

    NASA Astrophysics Data System (ADS)

    Richman, Barbara T.

    A fledgling international organization plans to launch, in the next few months, a journal devoted to the study of the history of the earth sciences. The journal, to be published by the History of Earth Sciences Society (HESS), will be edited by Gerald M. Friedman ot the Rensselaer Polytechnic Institute.HESS will promote interest and scholarship in the history of the earth sciences by publishing the semiannual journal, by organizing meetings about the history of earth sciences, and by supporting the efforts of other associations displaying similar interests, according to the society's draft constitution. An organizational meeting to ratify the constitution and to elect officers will be held in conjunction with the annual meeting of the Geological Society of America in October. The interim officers and the proposed slate for 1983 include David B. Kitts (University of Oklahoma, Norman), president; Albert V. Carrozi (University of Illinois, Urbana), president-elect; and Ellis L. Yochelson (U.S. Geological Survey, National Museum of Natural History), secretary.

  18. National NIF Diagnostic Program Fiscal Year 2002 Second Quarter Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MacGowan, B

    Since October 2001 the development of the facility diagnostics for NIF has been funded by the NIF Director through the National NIF Diagnostic Program (NNDP). The current emphasis of the NNDP is on diagnostics for the early NIF quad scheduled to be available for experiment commissioning in FY03. During the past six months the NNDP has set in place processes for funding diagnostics, developing requirements for diagnostics, design reviews and monthly status reporting. Those processes are described in an interim management plan for diagnostics (''National NIF Diagnostic Program Interim Plan'', NIF-0081315, April 2002) and a draft Program Execution Plan (''Programmore » Execution Plan for the National NlF Diagnostic Program'', NIF-0072083, October 2001) and documents cited therein. Work has been funded at Lawrence Livermore National Laboratory (LLNL), Los Alamos National Laboratory (LANL), Naval Research Laboratory (NRL), Sandia National Laboratories (SNL), Bechtel Nevada at Los Alamos and Santa Barbara. There are no major technical risks with the early diagnostics. The main concerns relate to integration of the diagnostics into the facility, all such issues are being worked. This report is organized to show the schedule and budget status and a summary of Change Control Board actions for the past six months. The following sections then provide short descriptions of the status of each diagnostic. Where design reviews or requirements documents are cited, the documents are available on the Diagnostics file server or on request.« less

  19. Sector Review: Workshops I and II. Pengian kebijakan, Subsektor Pendidikan, SD dan SMP. East Java Province, West Java Province, South Sulawes Province. Educational Policy and Planning Project.

    ERIC Educational Resources Information Center

    Florida State Univ., Tallahassee. Learning Systems Inst.

    This publication contains the first two of three training workshop manuals designed to be used in conducting an update of the Indonesian Education and Human Resources Sector Assessment. Workshop I covers the basic concepts, skills, and methods needed to design subsector updates and develop a draft plan for update activities. Workshops II and III…

  20. Management of Endurance Risk Factors: A Guide for Deep Draft Vessels

    DTIC Science & Technology

    2001-02-01

    Poor diet (frequent fried foods, high fat and sugar content, frequent caffeine consumption) • High workload (high physical and/or mental effort...Appendix A) q 8. Poor diet (menu includes frequent fried foods, high fat and sugar content, frequent caffeine consumption; see Section II-4, and II...into glucose (or sugar ), amino acids, and fatty acids. Cells throughout the body then process these compounds to make energy or ATP

  1. DEMONSTRATION OF RADON RESISTANT CONSTRUCTION TECHNIQUES - PHASE II. FINAL REPORT

    EPA Science Inventory

    The report gives results of a demonstration of radon resistant construction techniques. Sub-slab mitigation systems were installed (in accordance with draft standards) in 15 new Florida houses in 1992, and these houses have undergone extensive testing to validate techniques used ...

  2. Guide for curing of Portland cement concrete pavements : volume II.

    DOT National Transportation Integrated Search

    2006-08-01

    Information on the current state of knowledge of curing hydraulic-cement concrete and on current curing practice : was gathered by means of a literature review and a review of current standard guidance. From this information, a : draft guide for curi...

  3. 40 CFR 1501.8 - Time limits.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... essential considerations of national policy. (b) The agency may: (1) Consider the following factors in...) Decision on whether to prepare an environmental impact statement (if not already decided). (ii) Determination of the scope of the environmental impact statement. (iii) Preparation of the draft environmental...

  4. 40 CFR 1501.8 - Time limits.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... essential considerations of national policy. (b) The agency may: (1) Consider the following factors in...) Decision on whether to prepare an environmental impact statement (if not already decided). (ii) Determination of the scope of the environmental impact statement. (iii) Preparation of the draft environmental...

  5. 76 FR 43689 - Draft Guidance for Industry and Food and Drug Administration Staff; Mobile Medical Applications...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-21

    ... infusion pump stand, which is currently classified as a class I device because it supports the intended use of an infusion pump (class II medical device). A mobile medical app that simply supports the intended...

  6. A Process Evaluation of Project Developmental Continuity. Interim Report II, Part A: Program Case Studies. Volume 2.

    ERIC Educational Resources Information Center

    Spencer, Lynn, Ed.

    These 7 case studies are part of a series of documents on the evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Each case study reviews the planning year at a PDC demonstration site in one…

  7. A Process Evaluation of Project Developmental Continuity. Interim Report II, Part A: Program Case Studies. Volume I.

    ERIC Educational Resources Information Center

    Spencer, Lynn, Ed.

    These 8 case studies are part of a series of documents on the evaluation of Project Developmental Continuity (PDC), a Head Start demonstration program aimed at providing educational and developmental continuity between children's Head Start and primary school experiences. Each case study reviews the planning year at a PDC demonstration site in one…

  8. Family and Community Studies (FACS) Fourth Interim Report, Phase I and Activities and Timelines for Phase II.

    ERIC Educational Resources Information Center

    Espinoza, Renato; And Others

    Discussed in this paper is a preliminary analysis of findings from data gathered during the first phase of a research project exploring the processes whereby the nature of the mother's occupation affects her family life, especially (1) her partnership in decisions about housework, child care and education and (2) the negotiation of the allocation…

  9. A STUDY OF THE LUMBER INDUSTRY IN IDAHO, PART II.

    ERIC Educational Resources Information Center

    LOUDERMILK, KENNETH M.

    A MORE FORMAL STUDY OF THE LUMBER INDUSTRY (SEE VT 002 152 AND VT 002 153) RESULTED IN IMPRESSIONS OF THE WORKERS AND WORKING CONDITIONS. THERE ARE TWO GENERAL TYPES OF EMPLOYEE--(1) THOSE VIEWING LUMBERING AS STOPGAP EMPLOYMENT WHICH SERVES AS A SOURCE OF WAGES FOR EDUCATIONAL PURPOSES OR AS AN INTERIM JOB WHILE BETTER EMPLOYMENT IS SOUGHT, AND…

  10. Project FARE task III report : urban mass transportation industry reporting system design : interim task III report for November 1972-June 1973 period. Part II - Reporting system instructions.

    DOT National Transportation Integrated Search

    1973-06-01

    This report contains a description of the proposed uniform reporting system for the urban mass transit industry. It is presented in four volumes: Part I - Task Summary contains a description of how Task III was accomplished and the conclusions and re...

  11. Adaptive design clinical trials: a review of the literature and ClinicalTrials.gov

    PubMed Central

    Bothwell, Laura E; Avorn, Jerry; Khan, Nazleen F; Kesselheim, Aaron S

    2018-01-01

    Objectives This review investigates characteristics of implemented adaptive design clinical trials and provides examples of regulatory experience with such trials. Design Review of adaptive design clinical trials in EMBASE, PubMed, Cochrane Registry of Controlled Clinical Trials, Web of Science and ClinicalTrials.gov. Phase I and seamless Phase I/II trials were excluded. Variables extracted from trials included basic study characteristics, adaptive design features, size and use of independent data monitoring committees (DMCs) and blinded interim analyses. We also examined use of the adaptive trials in new drug submissions to the Food and Drug Administration (FDA) and European Medicines Agency (EMA) and recorded regulators’ experiences with adaptive designs. Results 142 studies met inclusion criteria. There has been a recent growth in publicly reported use of adaptive designs among researchers around the world. The most frequently appearing types of adaptations were seamless Phase II/III (57%), group sequential (21%), biomarker adaptive (20%), and adaptive dose-finding designs (16%). About one-third (32%) of trials reported an independent DMC, while 6% reported blinded interim analysis. We found that 9% of adaptive trials were used for FDA product approval consideration, and 12% were used for EMA product approval consideration. International regulators had mixed experiences with adaptive trials. Many product applications with adaptive trials had extensive correspondence between drug sponsors and regulators regarding the adaptive designs, in some cases with regulators requiring revisions or alterations to research designs. Conclusions Wider use of adaptive designs will necessitate new drug application sponsors to engage with regulatory scientists during planning and conduct of the trials. Investigators need to more consistently report protections intended to preserve confidentiality and minimise potential operational bias during interim analysis. PMID:29440155

  12. Statistical controversies in clinical research: building the bridge to phase II-efficacy estimation in dose-expansion cohorts.

    PubMed

    Boonstra, P S; Braun, T M; Taylor, J M G; Kidwell, K M; Bellile, E L; Daignault, S; Zhao, L; Griffith, K A; Lawrence, T S; Kalemkerian, G P; Schipper, M J

    2017-07-01

    Regulatory agencies and others have expressed concern about the uncritical use of dose expansion cohorts (DECs) in phase I oncology trials. Nonetheless, by several metrics-prevalence, size, and number-their popularity is increasing. Although early efficacy estimation in defined populations is a common primary endpoint of DECs, the types of designs best equipped to identify efficacy signals have not been established. We conducted a simulation study of six phase I design templates with multiple DECs: three dose-assignment/adjustment mechanisms multiplied by two analytic approaches for estimating efficacy after the trial is complete. We also investigated the effect of sample size and interim futility analysis on trial performance. Identifying populations in which the treatment is efficacious (true positives) and weeding out inefficacious treatment/populations (true negatives) are competing goals in these trials. Thus, we estimated true and false positive rates for each design. Adaptively updating the MTD during the DEC improved true positive rates by 8-43% compared with fixing the dose during the DEC phase while maintaining false positive rates. Inclusion of an interim futility analysis decreased the number of patients treated under inefficacious DECs without hurting performance. A substantial gain in efficiency is obtainable using a design template that statistically models toxicity and efficacy against dose level during expansion. Design choices for dose expansion should be motivated by and based upon expected performance. Similar to the common practice in single-arm phase II trials, cohort sample sizes should be justified with respect to their primary aim and include interim analyses to allow for early stopping. © The Author 2017. Published by Oxford University Press on behalf of the European Society for Medical Oncology. All rights reserved. For permissions, please email: journals.permissions@oup.com.

  13. New Light on Copenhagen and the German Nuclear Project

    NASA Astrophysics Data System (ADS)

    Cassidy, David C.

    The recent release of draft letters from Niels Bohr to Werner Heisenberg provides new insights into German fission research during World War II and into the reasons for its relative failure. I refute claims of deliberate failure and briefly summarize other contributing factors.

  14. 76 FR 75543 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-02

    ... Profile Zones (DFPZs), Lassen National Forest, Almanor Ranger District, Plumas County, CA, Comment Period... Treatment Activities, Updated and New Information, Idaho Panhandle National Forests, Priest Lake Ranger... (937) 257-5899. EIS No. 20110403, Draft EIS, USFS, CA, Creeks II Forest Restoration Project, Proposal...

  15. 12 CFR 5.20 - Organizing a bank.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... forward with the organization of the proposed national bank. A preliminary approval generally is subject... articles of association with the OCC; (ii) Draft and file an organization certificate containing specified... institutions from healthy competition from a new national bank. (2) Policy considerations. (i) In evaluating an...

  16. 75 FR 35457 - Draft of the 2010 Causal Analysis/Diagnosis Decision Information System (CADDIS)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-22

    ... Causal Analysis/Diagnosis Decision Information System (CADDIS) AGENCY: Environmental Protection Agency... site, ``2010 release of the Causal Analysis/Diagnosis Decision Information System (CADDIS).'' The... analyses, downloadable software tools, and links to outside information sources. II. How to Submit Comments...

  17. Functional Requirements of a Target Description System for Vulnerability Analysis

    DTIC Science & Technology

    1979-11-01

    called GIFT .1,2 Together the COMGEOM description model and GIFT codes make up the BRL’s target description system. The significance of a target...and modifying target descriptions are described. 1 Lawrence W. Bain, Jr. and Mathew J. Reisinger, "The GIFT Code User Manual; Volume 1...34The GIFT Code User Manual; Volume II, The Output Options," unpublished draft of BRL report. II. UNDERLYING PHILOSOPHY The BRL has a computer

  18. Assessment of Program Impact Through First Grade, Volume II: Impact on Institutions. An Evaluation of Project Developmental Continuity. Interim Report X.

    ERIC Educational Resources Information Center

    Rosario, Jose; And Others

    As part of a longitudinal study evaluating program effects, this report, the second in a series of six, describes the impact of Project Developmental Continuity (PDC) on the institutional policies and procedures of participating Head Start centers and elementary schools up to the time the evaluation study's cohort of children had completed grade…

  19. Contributions of Platform Motion to Simulator Training Effectiveness: Study II--Aerobatics. Interim Report for Period March 1976-November 1977.

    ERIC Educational Resources Information Center

    Martin, Elizabeth L.; Waag, Wayne L.

    A transfer-of-training design was used to evaluate the contributions of simulator training with synergistic six-degrees-of-freedom platform motion to aerobatic skills acquisition in the novice pilot. Thirty-six undergraduate pilot trainees were randomly assigned to one of three treatment groups: motion, no-motion, and control. Those in the control…

  20. Civilian Pilot Training Skills, Curricula, and Costs; Defense and Commercial Pilot Procurement, Training and Career Systems. Interim Report. Volume I and Volume II, March 1968.

    ERIC Educational Resources Information Center

    Logistics Management Inst., Washington, DC.

    The Federal Aviation Administration of the Department of Transportation controls civilian pilot training. Through its regulations and testing and licensing procedures, the FAA sets minimum criteria for course content and knowledge and skill acquisition. Since few training organizations have the economic resources required to do original research…

  1. A modified varying-stage adaptive phase II/III clinical trial design.

    PubMed

    Dong, Gaohong; Vandemeulebroecke, Marc

    2016-07-01

    Conventionally, adaptive phase II/III clinical trials are carried out with a strict two-stage design. Recently, a varying-stage adaptive phase II/III clinical trial design has been developed. In this design, following the first stage, an intermediate stage can be adaptively added to obtain more data, so that a more informative decision can be made. Therefore, the number of further investigational stages is determined based upon data accumulated to the interim analysis. This design considers two plausible study endpoints, with one of them initially designated as the primary endpoint. Based on interim results, another endpoint can be switched as the primary endpoint. However, in many therapeutic areas, the primary study endpoint is well established. Therefore, we modify this design to consider one study endpoint only so that it may be more readily applicable in real clinical trial designs. Our simulations show that, the same as the original design, this modified design controls the Type I error rate, and the design parameters such as the threshold probability for the two-stage setting and the alpha allocation ratio in the two-stage setting versus the three-stage setting have a great impact on the design characteristics. However, this modified design requires a larger sample size for the initial stage, and the probability of futility becomes much higher when the threshold probability for the two-stage setting gets smaller. Copyright © 2016 John Wiley & Sons, Ltd. Copyright © 2016 John Wiley & Sons, Ltd.

  2. 36 CFR 215.6 - Comments on proposed actions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) Environmental Assessment. Comments on the proposed action shall be accepted for 30 days following the date of publication of the legal notice. (ii) Draft Environmental Impact Statement. Comments on the proposed action... period for the opportunity to comment on environmental assessments shall not be extended. (2) Computation...

  3. 36 CFR 215.6 - Comments on proposed actions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) Environmental Assessment. Comments on the proposed action shall be accepted for 30 days following the date of publication of the legal notice. (ii) Draft Environmental Impact Statement. Comments on the proposed action... period for the opportunity to comment on environmental assessments shall not be extended. (2) Computation...

  4. 36 CFR 215.6 - Comments on proposed actions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Environmental Assessment. Comments on the proposed action shall be accepted for 30 days following the date of publication of the legal notice. (ii) Draft Environmental Impact Statement. Comments on the proposed action... period for the opportunity to comment on environmental assessments shall not be extended. (2) Computation...

  5. 36 CFR 215.6 - Comments on proposed actions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Environmental Assessment. Comments on the proposed action shall be accepted for 30 days following the date of publication of the legal notice. (ii) Draft Environmental Impact Statement. Comments on the proposed action... period for the opportunity to comment on environmental assessments shall not be extended. (2) Computation...

  6. 36 CFR 215.6 - Comments on proposed actions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) Environmental Assessment. Comments on the proposed action shall be accepted for 30 days following the date of publication of the legal notice. (ii) Draft Environmental Impact Statement. Comments on the proposed action... period for the opportunity to comment on environmental assessments shall not be extended. (2) Computation...

  7. Spheres settling in an Oldroyd-B fluid

    NASA Astrophysics Data System (ADS)

    Pan, Tsorng-Whay; Glowinski, Roland

    2017-11-01

    In this talk we present a numerical study of the dynamics of balls settling in a vertical channel with a square cross-section filled with an Oldroyd-B fluid. For the case of two balls, two typical kinds of particle dynamics are obtained: (i) periodic interaction between two balls and (ii) the formation of a vertical chain of two balls. For the periodic interaction of two balls occurred at lower values of the elasticity number, two balls draft, kiss and break away periodically and the chain is not formed due to not strong enough elastic force. For slightly higher values of the elasticity number, two balls draft, kiss and break away a couple times first and then form a chain. Such chain finally becomes a vertical one after the oscillation damps out. For higher values of the elasticity number, two balls draft, kiss and form a vertical chain right away. The formation of three ball chain can be obtained at higher values of the elasticity number. This work was supported by NSF (Grant DMS-1418308).

  8. Draft final report : musculoskeletal disorders II, spinal cord injury and commercial motor vehicle driver safety (comprehensive review).

    DOT National Transportation Integrated Search

    2009-03-20

    This report was prepared by ECRI Institute under subcontract to MANILA Consulting Group, Inc., which holds prime GS-10F-0177N/DTMC75-06-F-00039 with the Department of Transportations Federal Motor Carrier Safety Administration. ECRI Institute is a...

  9. Clothing and Textiles II. Semester Course. Draft.

    ERIC Educational Resources Information Center

    Blanton, Harriet; And Others

    The clothing and textiles guide for a second level semester course for grades 10-12 identifies objectives and learning experiences with basic reference to developmental tasks, needs, interests, capacities, and prior learning experiences of students. It was developed for use with students who exhibited skill and a high degree of satisfaction from…

  10. 75 FR 32240 - Draft Tier II Environmental Impact Statement: Southeast High Speed Rail Corridor-Richmond, VA...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-07

    ... Rail and Public Transportation (DRPT) are co-lead State agencies. The Environmental Protection Agency... 27699-1553, or SEHSR Comments, Virginia Department of Rail and Public Transportation, 600 East Main... Ms. Christine Fix, Virginia Department of Rail & Public Transportation, 600 East Main Street, Suite...

  11. U.S. National Park Service, National Mall and Memorial Parks, Washington, DC - DC00000345 & DC00000370

    EPA Pesticide Factsheets

    Public notice of draft permit and opportunity for public comment under the Clean Water Act to the National Park Service for discharges of comingled stormwater and pool flushings from the World War II Memorial and the Lincoln Memorial Reflecting Pool.

  12. Northeast Corridor Improvement Project Electrification - New Haven, CT to Boston, MA : Draft Environmental Impact Statement/Report. Volume II: Land use and Regulated Areas

    DOT National Transportation Integrated Search

    1993-09-01

    The impacts of extending electrification on the National Railroad Passenger Corporation's (Amtrak) Northeast Corridor (NEC) from New Haven, Connecticut to Boston, Massachusetts are of direct concern to the Federal Railroad Administration (FRA). To im...

  13. 78 FR 24438 - Board of Directors Audit Committee; Sunshine Act Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-25

    ... NEIGHBORHOOD REINVESTMENT CORPORATION Board of Directors Audit Committee; Sunshine Act Meeting... Secretary (202) 220-2376; [email protected] . AGENDA: I. CALL TO ORDER II. Executive Session with Internal Audit... Policy VI. External 3rd Party Audit Communication VII. FY 2014 Risk Assessment & Draft Internal Audit...

  14. Final report of the independent counsel for Iran/Contra matters. Volume 2: Indictments, plea agreements, interim reports to the congress, and administrative matters

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walsh, L.E.

    1993-08-04

    In October and November 1986, two secret U.S. Government operations were publicly exposed, potentially implicating Reagan Administration officials in illegal activities. These operations were the provision of assistance to the military activities of the Nicaraguan contra rebels during an October 1984 to October 1986 prohibition on such aid, and the sale of U.S. arms to Iran in contravention of stated U.S. policy and in possible violation of arms-export controls. In late November 1986, Reagan Administration officials announced that some of the proceeds from the sale of U.S. arms to Iran had been diverted to the contras. As a result, Attorneymore » General Edwin Meese III sought the appointment of an independent counsel to investigate and prosecute possible crimes. Volume II contains indictments, plea agreements, interim reports to Congress and administrative matters from that investigation.« less

  15. The Family and Medical Leave Act of 1993--Wage and Hour Division, Department of Labor. Interim final rule; request for comments.

    PubMed

    1993-06-04

    This document contains interim regulations implementing the Family and Medical Leave Act of 1993 called ("FMLA" or "the Act"). The Act is effective on August 5, 1993, six months from the date of its enactment. Where a collective bargaining agreement is in effect on August 5, 1993, the Act is effective when the collective bargaining agreement terminates or February 5, 1994, whichever is earlier. The purpose of these regulations is to set forth the requirements of Title I and Title IV of the Act. Title I applies to covered private employers and public agencies (except for most of the Federal Government, which is governed by Title II). Title IV of the Act primarily concerns the relationship between FMLA and other laws, as well as collective bargaining agreements and other employer plans and programs.

  16. Northeast Artificial Intelligence Consortium Annual Report. Volume 2. 1988 Discussing, Using, and Recognizing Plans (NLP)

    DTIC Science & Technology

    1989-10-01

    Encontro Portugues de Inteligencia Artificial (EPIA), Oporto, Portugal, September 1985. [15] N. J. Nilsson. Principles Of Artificial Intelligence. Tioga...FI1 F COPY () RADC-TR-89-259, Vol II (of twelve) Interim Report October 1969 AD-A218 154 NORTHEAST ARTIFICIAL INTELLIGENCE CONSORTIUM ANNUAL...7a. NAME OF MONITORING ORGANIZATION Northeast Artificial Of p0ilcabe) Intelligence Consortium (NAIC) Rome_____ Air___ Development____Center

  17. Analysis of phase II methodologies for single-arm clinical trials with multiple endpoints in rare cancers: An example in Ewing's sarcoma.

    PubMed

    Dutton, P; Love, S B; Billingham, L; Hassan, A B

    2018-05-01

    Trials run in either rare diseases, such as rare cancers, or rare sub-populations of common diseases are challenging in terms of identifying, recruiting and treating sufficient patients in a sensible period. Treatments for rare diseases are often designed for other disease areas and then later proposed as possible treatments for the rare disease after initial phase I testing is complete. To ensure the trial is in the best interests of the patient participants, frequent interim analyses are needed to force the trial to stop promptly if the treatment is futile or toxic. These non-definitive phase II trials should also be stopped for efficacy to accelerate research progress if the treatment proves to be particularly promising. In this paper, we review frequentist and Bayesian methods that have been adapted to incorporate two binary endpoints and frequent interim analyses. The Eurosarc Trial of Linsitinib in advanced Ewing Sarcoma (LINES) is used as a motivating example and provides a suitable platform to compare these approaches. The Bayesian approach provides greater design flexibility, but does not provide additional value over the frequentist approaches in a single trial setting when the prior is non-informative. However, Bayesian designs are able to borrow from any previous experience, using prior information to improve efficiency.

  18. Forced Draft Blowers, Duct Work For

    DTIC Science & Technology

    1935-06-01

    il l~!! · ;Jp iiH X j H ~ rt ’l ~t;Jn; J!1 ’’ild .at~ rfl: 1:;!( ~rLtf {: PJ : tf1 :~ff:’n’’ !lh1~rt ~1~ · ., , •.. ’ , l,l·,tr t’t’t,m,;l ~ ·rr. I I...Jii ~ ~ ~~~~·htt tt ill· IQ\\u ·· ~t ~ lrt 111 t{~ ifub!ilL 0ii :trtW!,ff.’ : · tj tf1 -l-!1 ’ ·• ll·ld~Htf ’II ’t 1 lrl lll ld u [ 1 · ~ :,· l~ltl

  19. Mode II Interlaminar Fracture Toughness and Fatigue Characterization of a Graphite Epoxy Composite Material

    NASA Technical Reports Server (NTRS)

    O'Brien, T. Kevin; Johnston, William M.; Toland, Gregory J.

    2010-01-01

    Mode II interlaminar fracture toughness and delamination onset and growth characterization data were generated for IM7/8552 graphite epoxy composite materials from two suppliers for use in fracture mechanics analyses. Both the fracture toughness testing and the fatigue testing were conducted using the End-notched Flexure (ENF) test. The ENF test for mode II fracture toughness is currently under review by ASTM as a potential standard test method. This current draft ASTM protocol was used as a guide to conduct the tests on the IM7/8552 material. This report summarizes the test approach, methods, procedures and results of this characterization effort.

  20. Adaptive clinical trial design.

    PubMed

    Chow, Shein-Chung

    2014-01-01

    In recent years, the use of adaptive design methods in clinical trials based on accumulated data at interim has received much attention because of its flexibility and efficiency in pharmaceutical/clinical development. In practice, adaptive design may provide the investigators a second chance to modify or redesign the trial while the study is still ongoing. However, it is a concern that a shift in target patient population may occur after significant adaptations are made. In addition, the overall type I error rate may not be preserved. Moreover, the results may not be reliable and hence are difficult to interpret. As indicated by the US Food and Drug Administration draft guidance on adaptive design clinical trials, the adaptive design has to be a prospectively planned opportunity and should be based on information collected within the study, with or without formal statistical hypothesis testing. This article reviews the relative advantages, limitations, and feasibility of commonly considered adaptive designs in clinical trials. Statistical concerns when implementing adaptive designs are also discussed.

  1. U.S. Earth Observation Programs May Still Be at Risk

    NASA Astrophysics Data System (ADS)

    Zielinski, Sarah

    2005-10-01

    A recent interim report from a committee of the National Research Council (NRC) of the U.S. National Academies warned that the U.S. system of environmental satellites was ``at risk of collapse'' (see Eos, 10 May 2005, p. 186). Nearly six months later, despite assurances from NASA that the agency would work to address in its fiscal year (FY) 2007 budget some of the imbalances that have led to mission delays and cancellations, these satellite programs may still be at risk. NASA funding for Earth science has suffered in recent years due to several pressures on the budget: deficit reduction, efforts to restore the space shuttle program, and plans for missions to the Moon and Mars. The NRC report, which was released as a draft in April and in its final form on 8 September, noted that six planned missions with implications for Earth science research were delayed, descoped, or canceled in the proposed FY2006 NASA budget.

  2. Probabilistic Seismic Hazard Assessment for Iraq

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Onur, Tuna; Gok, Rengin; Abdulnaby, Wathiq

    Probabilistic Seismic Hazard Assessments (PSHA) form the basis for most contemporary seismic provisions in building codes around the world. The current building code of Iraq was published in 1997. An update to this edition is in the process of being released. However, there are no national PSHA studies in Iraq for the new building code to refer to for seismic loading in terms of spectral accelerations. As an interim solution, the new draft building code was considering to refer to PSHA results produced in the late 1990s as part of the Global Seismic Hazard Assessment Program (GSHAP; Giardini et al.,more » 1999). However these results are: a) more than 15 years outdated, b) PGA-based only, necessitating rough conversion factors to calculate spectral accelerations at 0.3s and 1.0s for seismic design, and c) at a probability level of 10% chance of exceedance in 50 years, not the 2% that the building code requires. Hence there is a pressing need for a new, updated PSHA for Iraq.« less

  3. 75 FR 51331 - Draft Tier II Environmental Impact Statement: Southeast High Speed Rail Corridor-Richmond, VA...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-19

    ... Carolina Department of Transportation Rail Division (NCDOT) and the Virginia Department of Rail and Public... Raleigh,'' in the subject heading; or Ms. Christine Fix, Department of Rail & Public Transportation, 600... Department of Rail and Public Transportation Office at 600 East Main Street, Suite 2102, Richmond, VA; and...

  4. Curriculum Enrichment with Computer Software: Adventures in the Trade.

    ERIC Educational Resources Information Center

    Wassermann, Selma

    2001-01-01

    Creating a CD-ROM to enrich the 11th-grade social-studies curriculum was challenging, but rewarding. Draft storyboards and stock World War II footage soon led to a digital production called "Presumed Enemies," which put the events surrounding the internment of Japanese Canadians and Japanese Americans into historical context. (MLH)

  5. 75 FR 51749 - Bureau for Democracy, Conflict and Humanitarian Assistance Office of Food for Peace Announcement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-23

    ... AGENCY FOR INTERNATIONAL DEVELOPMENT Bureau for Democracy, Conflict and Humanitarian Assistance Office of Food for Peace Announcement of Draft Request for Applications for Title II Non-Emergency Food... Democracy, Conflict and Humanitarian Assistance. [FR Doc. 2010-20874 Filed 8-20-10; 8:45 am] BILLING CODE P ...

  6. 76 FR 40921 - Draft Guidance for Industry and Food and Drug Administration Staff; Enforcement Policy for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-12

    ... regard to enforcement of premarket notification (510(k)) requirements for certain in vitro diagnostic and... devices that have established safety and effectiveness profiles and for which it believes 510(k) review is... 510(k) requirement through rulemaking that would reclassify the Class II devices and amend the...

  7. Computer Programs for Technical Communicators: The Compelling Curriculum. Working Draft.

    ERIC Educational Resources Information Center

    Selfe, Cynthia L.; Wahlstrom, Billie J.

    A series of computer programs have been developed at Michigan Technological University for use with technical writing and technical communications classes. The first type of program in the series, CURIE II, includes process-based modules, each of which corresponds to one of the following assignments: memoranda, resumes, feasibility reports,…

  8. The Birth of the Universal Declaration of Human Rights.

    ERIC Educational Resources Information Center

    Cooper, Michael

    1998-01-01

    Outlines the history of the ideals and enactment of the United Nations' Universal Declaration of Human Rights (UDHR). Includes a discussion of the origins of the concept of human rights, the impact of World War II, the role of nongovernmental organizations, and the process of drafting and adopting the UDHR. (DSK)

  9. Monterey Peninsula Water Supply Project. Supplemental Draft Environmental Impact Report/Statement II. Appendices

    DTIC Science & Technology

    1993-02-01

    ROSACEAE Acaena californica: C-S, CPI Adenostoma fasciculctmm: CH-, CS, C-L Aichemilla arvensis: CP Fragaria vesca ssp. cabjfomica: NP, LO, M-LI Hetermeles...Thamnophis elegans * Western Aquatic Garter Snake T. couchi * Common Garter Snake T. sinalis * Western Rattlesnake Crotalus viridis TOTAL 22 8 3 3 BIRDS

  10. 76 FR 44935 - Draft Guidance for Industry and Food and Drug Administration Staff; 510(k) Device Modifications...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-27

    .... In August 2010, the Center for Devices and Radiological Health (CDRH) published two documents in.... These documents are titled ``CDRH Preliminary Internal Evaluations--Volume I: 510(k) Working Group Preliminary Report and Recommendations'' and ``CDRH Preliminary Internal Evaluations--Volume II: Task Force on...

  11. An open label, single-arm, phase II multicenter study of the safety and efficacy of CG0070 oncolytic vector regimen in patients with BCG-unresponsive non-muscle-invasive bladder cancer: Interim results.

    PubMed

    Packiam, Vignesh T; Lamm, Donald L; Barocas, Daniel A; Trainer, Andrew; Fand, Benjamin; Davis, Ronald L; Clark, William; Kroeger, Michael; Dumbadze, Igor; Chamie, Karim; Kader, A Karim; Curran, Dominic; Gutheil, John; Kuan, Arthur; Yeung, Alex W; Steinberg, Gary D

    2017-07-26

    CG0070 is a replication-competent oncolytic adenovirus that targets bladder tumor cells through their defective retinoblastoma pathway. Prior reports of intravesical CG0070 have shown promising activity in patients with high-grade non-muscle invasive bladder cancer (NMIBC) who previously did not respond to bacillus Calmette-Guérin (BCG). However, limited accrual has hindered analysis of efficacy, particularly for pathologic subsets. We evaluated interim results of a phase II trial for intravesical CG0070 in patients with BCG-unresponsive NMIBC who refused cystectomy. At interim analysis (April 2017), 45 patients with residual high-grade Ta, T1, or carcinoma-in-situ (CIS) ± Ta/T1 had evaluable 6-month follow-up in this phase II single-arm multicenter trial (NCT02365818). All patients received at least 2 prior courses of intravesical therapy for CIS, with at least 1 being a course of BCG. Patients had either failed BCG induction therapy within 6 months or had been successfully treated with BCG with subsequent recurrence. Complete response (CR) at 6 months was defined as absence of disease on cytology, cystoscopy, and random biopsies. Of 45 patients, there were 24 pure CIS, 8 CIS + Ta, 4 CIS + T1, 6 Ta, 3 T1. Overall 6-month CR (95% CI) was 47% (32%-62%). Considering 6-month CR for pathologic subsets, pure CIS was 58% (37%-78%), CIS ± Ta/T1 50% (33%-67%), and pure Ta/T1 33% (8%-70%). At 6 months, the single patient that progressed to muscle-invasive disease had Ta and T1 tumors at baseline. No patients with pure T1 had 6-month CR. Treatment-related adverse events (AEs) at 6 months were most commonly urinary bladder spasms (36%), hematuria (28%), dysuria (25%), and urgency (22%). Immunologic treatment-related AEs included flu-like symptoms (12%) and fatigue (6%). Grade III treatment-related AEs included dysuria (3%) and hypotension (1.5%). There were no Grade IV/V treatment-related AEs. This phase II study demonstrates that intravesical CG0070 yielded an overall 47% CR rate at 6 months for all patients and 50% for patients with CIS, with an acceptable level of toxicity for patients with high-risk BCG-unresponsive NMIBC. There is a particularly strong response and limited progression in patients with pure CIS. Copyright © 2017 Elsevier Inc. All rights reserved.

  12. FAA (Federal Aviation Administration) Aviation Forecasts: Fiscal Years 1989-2000

    DTIC Science & Technology

    1989-03-01

    predict interim business cycles. FAA FORECAST ECONOMIC ASSUMPTIONS FISCAL YEARS 1989 - 2000 HISTORICAL FORECAST PERCENT AVERAGE ANNUAL GROWTH ECONOMIC ...During previous economic cycles, changes in the general aviation industry have generally paralleled changes in business activity. Empirical results have...FiFAA-APO 89- MARCH 198 US eat e T of 0rrs orci Fedra Aviatio Ad instato 0 NA II I1 Technical Report Documentation Page 1 ReotN.2. Government

  13. Aircrew Training Devices: Utility and Utilization of Advanced Instructional Features (Phase II-Air Training Command, Military Airlift Command, and Strategic Air Command [and] Phase III-Electronic Warfare Trainers).

    ERIC Educational Resources Information Center

    Polzella, Donald J.; Hubbard, David C.

    This document consists of an interim report and a final report which describe the second and third phases of a project designed to determine the utility and utilization of sophisticated hardware and software capabilities known as advanced instructional features (AIFs). Used with an aircrew training device (ATD), AIFs permit a simulator instructor…

  14. National Assessment of Title I: Interim Report. Volume II: Closing the Reading Gap: First Year Findings from a Randomized Trial of Four Reading Interventions for Striving Readers

    ERIC Educational Resources Information Center

    Torgesen, Joseph; Myers, David; Schirm, Allen; Stuart, Elizabeth; Vartivarian, Sonya; Mansfield, Wendy; Stancavage, Fran; Durno, Donna; Javorsky, Rosanne; Haan, Cinthia

    2006-01-01

    According to the National Assessment of Educational Progress, nearly 4 in 10 fourth graders read below the basic level. These literacy problems get worse as students advance through school and are exposed to progressively more complex concepts and courses. The purpose of this study was to assess the effectiveness of four remedial reading programs…

  15. Evaluation of Gust and Draft Velocities from Flights of P-61C Airplanes within Thunderstorms August 21, 1946 to August 22, 1946 at Orlando, Florida

    NASA Technical Reports Server (NTRS)

    Tolefson, H. B.

    1946-01-01

    Tables I and II of this report summarize the gust and draft velocity data for thunderstorm flights 25 and 26 of August 21, 1946 and August 22, 1946, respectively. These dta were evaluated from records of NACA instruments installed in P-61C airplanes and are of the type presented in reference 1 for previous flights. Table III summarizes the readings of a milliammeter which was used in conjunction with other equipment to indicate ambient air temperature during thunderstorm surveys. These data were read from motion-picture records of the instrument and include all cases in which variations in the instrument indications were noted during the present flights.

  16. Evaluation of Gust and Draft Velocities from Flights of P-61C Airplanes Within Thunderstorms August 14, 1946 to August 15, 1946 at Orlando, Florida

    NASA Technical Reports Server (NTRS)

    Tolefson, H. B.

    1947-01-01

    Tables I and II of the present paper summarize the gust and draft velocity data for thunderstorm-flights 21 and 22 of August 14, 1946 and August 15, 1946, respectively. These data were evaluated from records of NACA airspeed-altitude and acceleration recorders installed in P-61C airplanes and are of the type presented for previous flights. Table III summarizes the readings of a milliammeter which was used in conjunction with other equipment to indicate ambient-air temperature during thunderstorm surveys. These data were read from photo-observer records and include all cases in which variations of the instrument indications were noted for the present flights.

  17. Evaluation of Gust and Draft Velocities from Flights of P-61C Airplanes within Thunderstorms. IV - July 19, 1946 to July 20, 1946 at Orlando, Florida. Part 4; July 19, 1946 to July 20, 1946 at Orlando, Florida

    NASA Technical Reports Server (NTRS)

    Tolefson, H. B.

    1946-01-01

    Summaries of the gust and draft velocities evaluated from acceleration and airspeed-altitude records taken by NACA instruments installed n P-61c airplanes participating in thunderstorm flights 12 and 13 of July 19, 1946, and July 20, 1946, respectively, are presented in tables I and II herein. These data are of the type presented in reference 1 for previous flights. Inspection of the motion picture records of the pilots' instrument panels for the present flights indicated that the milliameter connected to equipment for measuring ambient air temperature read zero throughout all traverses.

  18. Evaluation of Gust and Draft Velocities from Flights of P-61C Airplanes within Thunderstorms: September 5, 1946 to September 10, 1946 at Orlando, Florida

    NASA Technical Reports Server (NTRS)

    Tolefson, H. B.

    1947-01-01

    Tables I and II of this report summarize the gust and draft velocity data for thunderstorm flights 31, 32, and 33 of September 5, 1946, September 6, 1946, and September 10, 1946, respectively. These data were evaluated from records of NACA instruments installed in P-61C airplanes and are of the type presented for previous flights. Table III summarizes the readings of a milliammeter which was used in conjunction with other equipment to indicate ambient air temperature during thunderstorm surveys. These data were read from motion-picture records of the instrument and include all cases in which variations in the instrument indications were noted for the present flights.

  19. Polycyclic Aromatic Hydrocarbons in Fine Particulate Matter ...

    EPA Pesticide Factsheets

    This study measured polycyclic aromatic hydrocarbon (PAH) composition in particulate matter emissions from residential cookstoves. A variety of fuel and cookstove combinations were examined, including: (i) liquid petroleum gas (LPG), (ii) kerosene in a wick stove, (iii) wood (10% and 30% moisture content on a wet basis) in a forced-draft fan stove, and (iv) wood in a natural-draft rocket cookstove. LPG combustion had the highest thermal efficiency (~57%) and the lowest PAH emissions per unit fuel energy, resulting in the lowest PAH emissions per useful energy delivered (MJd). The average benzo[a]pyrene (B[a]P) emission factor for LPG was 0.842 µg/MJd; the emission rate was 0.043 µg/min. The highest PAH emissions were from wood burning in the natural-draft stove (209-700 µg B[a]P/MJd). PAH emissions from kerosene were significantly lower than those from the wood burning in the natural-draft cookstove, but higher than those from LPG. It is expected that in rural regions where LPG and kerosene are unavailable or unaffordable, the forced-draft fan stove may be an alternative because its emission factor (5.17-8.07 µg B[a]P/MJd) and emission rate (0.52-0.57 µg/min) are similar to kerosene (5.36 µg B[a]P/MJd and 0.45 µg/min). Compared with wood combustion emissions, LPG stoves emit less total PAH emissions and less fractions of high molecular weight PAHs. Relatively large variations in PAH emissions from LPG call for additional future tests to identify the major

  20. What is the impact of different VLBI analysis setups of the tropospheric delay on precipitable water vapor trends?

    NASA Astrophysics Data System (ADS)

    Balidakis, Kyriakos; Nilsson, Tobias; Heinkelmann, Robert; Glaser, Susanne; Zus, Florian; Deng, Zhiguo; Schuh, Harald

    2017-04-01

    The quality of the parameters estimated by global navigation satellite systems (GNSS) and very long baseline interferometry (VLBI) are distorted by erroneous meteorological observations applied to model the propagation delay in the electrically neutral atmosphere. For early VLBI sessions with poor geometry, unsuitable constraints imposed on the a priori tropospheric gradients is a source of additional hassle of VLBI analysis. Therefore, climate change indicators deduced from the geodetic analysis, such as the long-term precipitable water vapor (PWV) trends, are strongly affected. In this contribution we investigate the impact of different modeling and parameterization of the propagation delay in the troposphere on the estimates of long-term PWV trends from geodetic VLBI analysis results. We address the influence of the meteorological data source, and of the a priori non-hydrostatic delays and gradients employed in the VLBI processing, on the estimated PWV trends. In particular, we assess the effect of employing temperature and pressure from (i) homogenized in situ observations, (ii) the model levels of the ERA Interim reanalysis numerical weather model and (iii) our own blind model in the style of GPT2w with enhanced parameterization, calculated using the latter data set. Furthermore, we utilize non-hydrostatic delays and gradients estimated from (i) a GNSS reprocessing at GeoForschungsZentrum Potsdam, rigorously considering tropospheric ties, and (ii)) direct ray-tracing through ERA Interim, as additional observations. To evaluate the above, the least-squares module of the VieVS@GFZ VLBI software was appropriately modified. Additionally, we study the noise characteristics of the non-hydrostatic delays and gradients estimated from our VLBI and GNSS analyses as well as from ray-tracing. We have modified the Theil-Sen estimator appropriately to robustly deduce PWV trends from VLBI, GNSS, ray-tracing and direct numerical integration in ERA Interim. We disseminate all our solutions in the latest Tropo-SINEX format.

  1. Analysis of Transportation Options for Commercial Spent Fuel in the U.S.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kalinina, Elena; Busch, Ingrid Karin

    The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S.more » Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage The U.S. Department of Energy (DOE) is laying the groundwork for implementing interim storage and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF) and high and associated transportation of spent nuclear fuel (SNF) high and associated transportation of spent nuclear fuel (SNF) highand associated transportation of spent nuclear fuel (SNF)...« less

  2. Taking a Stand

    ERIC Educational Resources Information Center

    Lum, Lydia

    2006-01-01

    More than 300 men of Japanese descent refused to be drafted into the U.S. military in the 1940s, contending that they should not risk their lives for a country that had forced 120,000 Japanese-Americans, including them and their families, into internment camps. They would be willing to fight in World War II only after Japanese-Americans were…

  3. Structural evaluation of LIC-310-0396 and FAY-35-17-6.82 box beams with advanced strand deterioration : draft final report - phase II.

    DOT National Transportation Integrated Search

    2011-09-01

    This report describes the results from the testing of a full scale three span 43 year old adjacent prestressed concrete box beam bridge. This research is the second phase of the overall project entitled Structural Evaluation of LIC-310-0396 Box Be...

  4. Modified Interim Mandibular Advancement (MIMA) Appliance for Symptomatic Correction of Obstructive Sleep Apnea

    PubMed Central

    Singh, Harpreet; Mishra, Harsh Ashok; Gupta, Ankur

    2016-01-01

    Obstructive Sleep Apnea (OSA) is a chronic, progressive, multifactorial, life-threatening disorder that causes significant impact on patient’s life. Patients with OSA [Apnea/Hypopnea Index (AHI)>30] who cannot tolerate Continuous Positive Airway Pressure (CPAP) therapy or are not surgical candidates may benefit from oral appliances. This paper describes interim appliance devised from existing Hawley’s retainer in patients with OSA. A 38-year-old man of athletic built with history of orthodontic treatment six months back due to esthetic concerns and wearing upper Hawley’s retainer, reported with chief complaint of frequent nocturnal awakening along with excessive daytime somnolence. Based on diagnostic aids, he was diagnosed with Class II Division 1 malocclusion with severe mandibular retrusion. Sleep test revealed AHI score of 34, suggestive of severe OSA. With ENT and Oral surgeon concurrence, mandibular advancement of 7mm with Bilateral Sagital Split Osteotomy (BSSO) with distraction was contemplated as a viable functional and curative stable treatment plan. Because of non-adherence and non-compliance with CPAP therapy and on request of patient, an interim anterior positioning appliance was devised to facilitate comfortable sound sleep till the time surgery is impending. After three months of wearing this customized appliance, improved quality of sleep was discernible; both subjectively as reported by patient and objectively using sleep test (AHI=9.8). PMID:27656589

  5. Flexible Conformable Clamps for a Machining Cell with Applications to Turbine Blade Machining.

    DTIC Science & Technology

    1983-05-01

    PERIOD COVERED * FLEXIBLE CONFORMABLE CLAMPS FOR A MACHINING CELL Interim WITH APPLICATIONS TO TURBINE BLADE MACHINING 6. PERFORMING ORG. REPORT NUMBER...7. AuTmbR(s) 6. CONTRACT OR GRANT NUMBER(a) Eiki Kurokawa 3. PERFORMING ORGANIZATION NAME AND ADDRESS 10. PROGRAM ELE%4NTPROJECT. TASK Carnegie-Mellon...University AREA a WORK UhIT NUMBERS The Robotics Institute Pittsburgh, PA. 15213 II. CONTROLLING OFFICE NAME AND ADDRESS 12. REPORT DATE May 1983. 13

  6. Analysis of phase II methodologies for single-arm clinical trials with multiple endpoints in rare cancers: An example in Ewing’s sarcoma

    PubMed Central

    Dutton, P; Love, SB; Billingham, L; Hassan, AB

    2016-01-01

    Trials run in either rare diseases, such as rare cancers, or rare sub-populations of common diseases are challenging in terms of identifying, recruiting and treating sufficient patients in a sensible period. Treatments for rare diseases are often designed for other disease areas and then later proposed as possible treatments for the rare disease after initial phase I testing is complete. To ensure the trial is in the best interests of the patient participants, frequent interim analyses are needed to force the trial to stop promptly if the treatment is futile or toxic. These non-definitive phase II trials should also be stopped for efficacy to accelerate research progress if the treatment proves to be particularly promising. In this paper, we review frequentist and Bayesian methods that have been adapted to incorporate two binary endpoints and frequent interim analyses. The Eurosarc Trial of Linsitinib in advanced Ewing Sarcoma (LINES) is used as a motivating example and provides a suitable platform to compare these approaches. The Bayesian approach provides greater design flexibility, but does not provide additional value over the frequentist approaches in a single trial setting when the prior is non-informative. However, Bayesian designs are able to borrow from any previous experience, using prior information to improve efficiency. PMID:27587590

  7. Extraction, -scrub, -strip test results from the interim salt disposition program macrobatch 10 tank 21H qualification samples

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peters, T. B.

    Savannah River National Laboratory (SRNL) analyzed samples from Tank 21H in support of qualification of Macrobatch (Salt Batch) 10 for the Interim Salt Disposition Program (ISDP). The Salt Batch 10 characterization results were previously reported.ii,iii An Extraction, -Scrub, -Strip (ESS) test was performed to determine cesium distribution ratios (D(Cs)) and cesium concentration in the strip effluent (SE) and decontaminated salt solution (DSS) streams; this data will be used by Tank Farm Engineering to project a cesium decontamination factor (DF). This test used actual Tank 21H material, and a sample of the NGS Blend solvent currently being used at the Modularmore » Caustic-Side Solvent Extraction Unit (MCU). The ESS test showed acceptable performance with an extraction D(Cs) value of 110. This value is consistent with results from previous salt batch ESS tests using similar solvent formulations. This is better than the predicted value of 39.8 from a recently created D(Cs) model.« less

  8. 76 FR 4369 - Interim Deputation Agreements; Interim BIA Adult Detention Facility Guidelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... Adult Detention Facility Guidelines AGENCY: Bureau of Indian Affairs, Interior. ACTION: Notice. SUMMARY: This notice announces the online publication of the Interim BIA Adult Detention Facility Guidelines and... Indian Affairs Web site. DATES: These Interim BIA Adult Detention Facility Guidelines and Interim Model...

  9. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...

  10. 24 CFR 35.820 - Interim controls.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim controls. 35.820 Section 35...-Possession Multifamily Property § 35.820 Interim controls. HUD shall conduct interim controls in accordance... accordance with § 35.815. Interim controls are considered completed when clearance is achieved in accordance...

  11. Learning To Teach in Multicultural Contexts: Exploring Preservice Teachers' Knowledge Change. Part I: Group Patterns. Part II: Case Studies. Draft.

    ERIC Educational Resources Information Center

    Artiles, Alfredo J.; And Others

    This study examined the impact of multicultural education courses on preservice teachers' pedagogical knowledge and beliefs about culturally diverse learners. Part 1 reports on a study of 20 preservice teachers pursuing a masters degree in elementary education enrolled in a required multicultural education course and were examined for their…

  12. Vulnerability Assessments in Support of the Climate Ready Estuaries Program: A Novel Approach Using Expert Judgement, Volume II: Results for the Massachusetts Bays Program (External Review Draft)

    EPA Science Inventory

    As part of the Climate Ready Estuaries (CRE) program, the Global Change Research Program (GCRP) in the National Center for Environmental Assessment, Office of Research and Development at the U.S. Environmental Protection Agency has prepared a report exploring a new methodology fo...

  13. Underkeel Clearance Study.

    DTIC Science & Technology

    1981-09-01

    EnterewJ N00014-80-C-0395 CONTENTS Page EXECUTIVE SUMMARY 1.0 INTRODUCTION 1.1 The Underlying Problem ................. 1-1 1.2 The Current Study...3-4 3.2.4 CVN Berthinq Facilities .................... 3-4 ii! JI N00014-80-C-0395 CONTENTS (continued) 3.3 Hydrologic Conditions...Drafts ...................... 3-10 3.8.3 Underkeel Clearance ........ .............. 3-10 4.0 THE ANALYSIS 4.1 The Physical Model

  14. 75 FR 50777 - Final Comprehensive Conservation Plan; John Hay National Wildlife Refuge, Merrimack County, NH

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-17

    .... We completed a thorough analysis of impacts on the human environment, which we included in the draft.... We would construct an alternate route for the John Hay II Forest Ecology Trail to allow visitors to... spur trail to the fen and back with informational signage on the ecology of fens, and install a...

  15. 78 FR 50480 - U.S. Department of State Advisory Committee on Private International Law (ACPIL): Public Meeting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-19

    ... to validate the identity of individuals who enter Department facilities. The data will be entered... draft convention will be discussed September 16-20, 2013, at the 59th session of UNCITRAL Working Group... convention in advance of the meeting of Working Group II. Those who cannot attend but wish to comment are...

  16. Language Legislation in the Belgian Colonial Charter of 1908: A Textual-Historical Analysis

    ERIC Educational Resources Information Center

    Meeuwis, Michael

    2015-01-01

    When in 1908 the Belgian government took over the Congo from King Leopold II, a charter was drafted that would serve as a constitution-like statutory code for the new colony. Article 3 in this "Colonial Charter" dealt with language and linguistic rights. It epitomized the duality of language questions with which Belgium remained faced…

  17. Monterey Peninsula Water Supply Project. Supplemental Draft Environmental Impact Report/Statement II. Volume 1.

    DTIC Science & Technology

    1993-02-01

    SCH # 87092203 1 February 1993 I ENS I -STATatm AI An"" im qNW tle II muh~~~b𔃻kftli UwwgdPrada eyle aw MAR 17 󈨡 13:34 USAED ’F CESPH-FE 41! 74𔃾...the proposed location for the connection to the Cal-Am distribution system is at the intersection of Playa Avenue and Fremont Boulevard in Seaside...Fremont Boulevard; the other is at the southeast corner of Playa Avenue and the alley east of Fremont Boulevard. Either of these sites offers sufficient

  18. Strategic Environmental Research & Development Program (SERDP): Phase I and Phase II Strategic Investment Plans FY 1992 and Interim Status Report of the Council.

    DTIC Science & Technology

    1993-10-01

    VLF/ELF) communication systems, used for early warning and strategic communications, are dependent on the electron densities in the "C" and "D...information into optical or electronic signals that can be remotely monitored. During FY92, an in-depth and definitive assessment of the feasibility...particularly metal finishing and electronics operations. BENEFITS: The broad program described above will provide the opportunity for EPA, the

  19. Research Needs for Artificial Intelligence Applications in Support of C3 (Command, Control, and Communication).

    DTIC Science & Technology

    1984-12-01

    system. The reconstruction process is Simply data fusion after allA data are in. After reconstruction, artifcial intelligence (Al) techniques may be...14. CATE OF fhPM~TVW MWtvt Ogv It PAWE COMN Interim __100 -_ TO December 1984 24 MILD ON" s-o Artificial intelligence Command control Data fusion...RD-Ai5O 867 RESEARCH NEEDS FOR ARTIFICIAL INTELLIGENCE APPLICATIONS i/i IN SUPPORT OF C3 (..(U) NAVAL OCEAN SVSTEIIS CENTER SAN DIEGO CA R R DILLARD

  20. Intelligent Use of CFAR Algorithms

    DTIC Science & Technology

    1993-05-01

    the reference windows can raise the threshold too high in many CFAR algorithms and result in masking of targets. GCMLD is a modification of CMLD that...AD-A267 755 RL-TR-93-75 III 11 III II liiI Interim Report May 1993 INTELLIGENT USE OF CFAR ALGORITHMS Kaman Sciences Corporation P. Antonik, B...AND DATES COVERED IMay 1993 Inte ’rim Jan 92 - Se2 92 4. TITLE AND SUBTITLE 5. FUNDING NUMBERS INTELLIGENT USE OF CFAR ALGORITHMS C - F30602-91-C-0017

  1. Draft genome sequence of multidrug-resistant Staphylococcus haemolyticus IPK_TSA25 harbouring a Staphylococcus aureus plasmid, pS0385-1.

    PubMed

    Kim, Hyung Jun; Jang, Soojin

    2017-12-01

    Staphylococcus haemolyticus is the second most frequently isolated coagulase-negative staphylococci from blood cultures. Moreover, multidrug resistance associated with the genome flexibility of S. haemolyticus has been increasingly reported worldwide. Here we report the draft genome sequence of multidrug-resistant S. haemolyticus IPK_TSA25 isolated from a building surface in South Korea. Genomic DNA of S. haemolyticus IPK_TSA25 was sequenced using the PacBio RS II sequencing platform. Generated reads were assembled using PacBio SMRT Analysis 2.3.0. The draft genome was annotated and antibiotic resistance genes were identified. The genome of 2517398bp contains various antibiotic resistance genes associated with resistance to β-lactams, aminoglycosides and macrolides. Genome analysis also revealed chromosomal integration of the full-length Staphylococcus aureus plasmid pS0385-1 containing a tetracycline resistance gene. The genome sequence reported in this study will provide valuable information to understand the flexibility of the S. haemolyticus genome, which facilitates acquisition of antibiotic resistance genes and contributes to the dissemination of antibiotic resistance by this emerging pathogen. Copyright © 2017 International Society for Chemotherapy of Infection and Cancer. Published by Elsevier Ltd. All rights reserved.

  2. Development of Yield and Tensile Strength Design Curves for Alloy 617

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nancy Lybeck; T. -L. Sham

    2013-10-01

    The U.S. Department of Energy Very High Temperature Reactor Program is acquiring data in preparation for developing an Alloy 617 Code Case for inclusion in the nuclear section of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel (B&PV) Code. A draft code case was previously developed, but effort was suspended before acceptance by ASME. As part of the draft code case effort, a database was compiled of yield and tensile strength data from tests performed in air. Yield strength and tensile strength at temperature are used to set time independent allowable stress for construction materials in B&PVmore » Code, Section III, Subsection NH. The yield and tensile strength data used for the draft code case has been augmented with additional data generated by Idaho National Laboratory and Oak Ridge National Laboratory in the U.S. and CEA in France. The standard ASME Section II procedure for generating yield and tensile strength at temperature is presented, along with alternate methods that accommodate the change in temperature trends seen at high temperatures, resulting in a more consistent design margin over the temperature range of interest.« less

  3. Energy efficient industrialized housing research program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berg, R.; Brown, G.Z.; Finrow, J.

    1989-01-01

    This is the second volume of a two volume report on energy efficient industrialized housing. Volume II contains support documentation for Volume I. The following items are included: individual trip reports; software bibliography; industry contacts in the US, Denmark, and Japan; Cost comparison of industrialized housing in the US and Denmark; draft of the final report on the systems analysis for Fleetwood Mobile Home Manufacturers. (SM)

  4. Cargo Movement Operations System (CMOS) System Segment Design Document (Draft) Increment II

    DTIC Science & Technology

    1990-05-02

    and are arranged in page number order. RATIONALE: N/A CMOS PMO ACCEPTS COMMENT: YES [ ] NO [ ] ERCI ACCEPTS COMMENT: YES [ ] NO [ ] COMMENT DISPOSITION...NO [ ] ERCI ACCEPTS COMMENT: YES [ ] NO [ ] COMMENT DISPOSITION: COMMENT STATUS: OPEN [ ] CLOSED [ ] ORIGINATOR CONTROL NUMBER: SSDD-0003 PROGRAM...CMOS. CMOS PMO ACCEPTS COMMENT: YES [ ] NO [ ] ERCI ACCEPTS COMMENT: YES [ ] NO [ ] COMMENT DISPOSITION: COMMENT STATUS: OPEN [ ] CLOSED [ 3 ORIGINATOR

  5. Cargo Movement Operations System (CMOS) Draft Software Test Plan. Increment II

    DTIC Science & Technology

    1991-02-14

    COMMENT: YES [ ] NO [ ] COMMENT DISPOSITION: ACCEPT [ ] REJECT [ J COMMENT STATUS: OPEN [ ] CLOSED [ ] Cmnt Page Paragraph No. No. Number Comment 1. 5 2...ERCI ACCEPTS COMMENT: YES [ ] NO [ ] COMMENT DISPOSITION: COMMENT STATUS: OPEN [ J CLOSED [ ] ORIGINATOR CONTROL NUMBER: STP-0003 PROGRAM OFFICE CONTROL...NO [1 ERCI ACCEPTS COMMENT: YES [ 1 NO [ ] COMMENT DISPOSITION: COMMENT STATUS: OPEN [ ] CLOSED [ ] ORIGINATOR CONTROL NUMBER: STP-0004 PROGRAM

  6. Cargo Movement Operations System (CMOS) Draft Software User’s Manual Increment II

    DTIC Science & Technology

    1991-06-26

    the user. CMOS PMO ACCEPTS COMMENT: YES [ ] NO [ ] ERCI ACCEPTS COMMENT: YES [ ] NO [ ] COMMENT DISPOSITION: COMMENT STATUS: OPEN [ ] CLOSED...indicated. CMOS PMO ACCEPTS COMMENT: YES [ ] NO [ ] ERCI ACCEPTS COMMENT: YES [ ] NO [ ] COMMENT DISPOSITION: COMMENT STATUS: OPEN [ ] CLOSED [ ] ORIGINATOR...YES [ ] NO [ ] COMMENT DISPOSITION: COMMENT STATUS: OPEN r I CLOSED [ ] ORIGINATOR CONTROL NUMBER: SUM-0006 PROGRAM OFFICE CONTROL NUMBER: DATA ITEM

  7. Draft Environmental Impact Statement. MX Deployment Area Selection and Land Withdrawal/Acquisition DEIS. Volume 3, Part II. Affected Environment.

    DTIC Science & Technology

    1980-12-01

    leaved rabbitbrush (Chrysothamnus viscidiflorus) and Mormon tea ( Ephedra viridis ). The Sevier River contains surface water year-round, and riparian...sagebrush, rubber rabbitbrush (Chrysothamnus nauseosus), and Mormon tea ( Ephedra spp). Shifts in dominance occur locally in response to topographic...bush (Larrea divaricata), Nevada ephedra ( Ephedra nevadensis), Mojave yucca (Yucca schidigera), and spiny menodora (Menodora spinescens). Creosote brush

  8. 77 FR 44528 - Dry Cargo Residue Discharges in the Great Lakes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-30

    ...The Coast Guard proposes replacing its existing interim rule with a new rule to regulate the operation of U.S. and foreign vessels carrying bulk dry cargo such as limestone, iron ore, and coal on the U.S. waters of the Great Lakes, and the operation of U.S. bulk dry cargo vessels anywhere on the Great Lakes. Specifically, the Coast Guard proposes new requirements for the discharge of bulk dry cargo residue (DCR) on the U.S. waters of the Great Lakes. The Coast Guard also announces the availability of the tiered Draft Environmental Impact Statement (DEIS) prepared in support of this proposal. The proposed rule would continue to allow non-hazardous and non-toxic discharges of bulk DCR in limited areas of the Great Lakes. However, vessel owners and operators would need to minimize DCR discharges using methods they would be required to document in DCR management plans. The proposed rule would prohibit limestone and clean stone DCR discharges in some waters where they are now permitted. The proposed rule promotes the Coast Guard's strategic goals of maritime mobility and safety and protection of natural resources.

  9. SQUIRE 2.0 (Standards for QUality Improvement Reporting Excellence): Revised Publication Guidelines from a Detailed Consensus Process

    PubMed Central

    Ogrinc, Greg; Davies, Louise; Goodman, Daisy; Batalden, Paul; Davidoff, Frank; Stevens, David

    2015-01-01

    Since the publication of Standards for Quality Improvement Reporting Excellence (SQUIRE 1.0) guidelines in 2008, the science of the field has advanced considerably. In this manuscript we describe the development of SQUIRE 2.0 and its key components. We undertook the revision between 2012 and 2015, using 1) semistructured interviews and focus groups to evaluate SQUIRE 1.0 plus feedback from an international steering group; 2) two face-to-face consensus meetings to develop interim drafts; and 3) pilot testing with authors and a public comment period. SQUIRE 2.0 emphasizes the reporting of three key components of systematic efforts to improve the quality, value, and safety of health care: the use of formal and informal theory in planning, implementing, and evaluating improvement work; the context in which the work is done; and the study of the intervention(s). SQUIRE 2.0 is intended for reporting the range of methods used to improve health care, recognizing that they can be complex and multidimensional. It provides common ground to share these discoveries in the scholarly literature (www.squire-statement.org). PMID:26517437

  10. South African court rejects country's new constitution.

    PubMed

    1996-09-20

    Fundamental principles designed to ensure that South Africa's new constitution upholds a wide range of individual rights and freedoms and establishes a responsive government with a balanced separation of powers, including recognition of the role of traditional tribal leadership, were adopted into the current interim constitution shortly before the 1994 free elections which brought Nelson Mandela and the African National Congress to power. In a judgement issued on September 6, 1996, South Africa's Constitutional Court rejected the country's new draft constitution, arguing that it failed to meet the standards of nine of the 34 principles established at the Kempton Park negotiations. The Constitutional Assembly is comprised of a joint meeting of the National Assembly and Senate. One of the court's major objections to the constitution concerned the proposed structure of rule, which was seen to give inadequate power to South Africa's nine provinces as compared with the national government. However, the bill of rights was almost entirely upheld. The bill would create a favorable environment for legalized abortion and guarantee a universal right of access to health care, including reproductive health services

  11. SQUIRE 2.0 (Standards for QUality Improvement Reporting Excellence): revised publication guidelines from a detailed consensus process.

    PubMed

    Ogrinc, Greg; Davies, Louise; Goodman, Daisy; Batalden, Paul; Davidoff, Frank; Stevens, David

    2015-01-01

    In the past several years, the science of health care improvement has advanced considerably. In this article, we describe the development of SQUIRE 2.0 and its key components. We undertook the revision between 2012 and 2015 using (1) interviews and focus groups to evaluate SQUIRE 1.0 plus feedback from an international steering group, (2) face-to-face consensus meetings to develop interim drafts, and (3) pilot testing with authors and a public comment period. SQUIRE 2.0 emphasizes 3 key components of systematic efforts to improve the quality, value, and safety of health care: formal and informal theory in planning, implementing, and evaluating improvement work; the context in which the work is done; and the study of the intervention(s). SQUIRE 2.0 is intended for reporting the range of methods used to improve health care, recognizing that they can be complex and multidimensional. It provides common ground to share these discoveries in the scholarly literature (www.squire-statement.org). © The Author(s) 2015.

  12. SQUIRE 2.0 (Standards for QUality Improvement Reporting Excellence): Revised Publication Guidelines from a Detailed Consensus Process.

    PubMed

    Ogrinc, Greg; Davies, Louise; Goodman, Daisy; Batalden, Paul; Davidoff, Frank; Stevens, David

    2015-01-01

    Since the publication of Standards for Quality Improvement Reporting Excellence (SQUIRE 1.0) guidelines in 2008, the science of the field has advanced considerably. In this manuscript we describe the development of SQUIRE 2.0 and its key components. We undertook the revision between 2012 and 2015, using 1) semistructured interviews and focus groups to evaluate SQUIRE 1.0 plus feedback from an international steering group; 2) two face-to-face consensus meetings to develop interim drafts; and 3) pilot testing with authors and a public comment period. SQUIRE 2.0 emphasizes the reporting of three key components of systematic efforts to improve the quality, value, and safety of health care: the use of formal and informal theory in planning, implementing, and evaluating improvement work; the context in which the work is done; and the study of the intervention(s). SQUIRE 2.0 is intended for reporting the range of methods used to improve health care, recognizing that they can be complex and multidimensional. It provides common ground to share these discoveries in the scholarly literature (www.squire-statement.org).

  13. Interim housing conditions profile, Benton and Franklin Counties, Washington: BWIP Repository Project: Working draft

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bolton, P.A.

    1987-11-01

    This report describes the housing stock and its availability in Benton and Franklin counties. Depending on the specific measures, data are presented for the entire MSA, for Benton and Franklin counties separately, for incorporated and unincorporated areas within the counties, and for specific incorporated areas. The most detailed data are available for the two counties and for the major cities of Kennewick and Richland in Benton County and Pasco in Franklin County. In 1986, 64 percent of the population of Benton County and 66 percent of the housing units were in Kennewick and Richland. Seventy-three percent of the population andmore » 75 percent of the housing were in the incorporated area of Benton County. In Franklin County, Pasco accounted for 52 percent of the county's 1986 population and 57 percent of its housing. Fifty-nine percent of the population and 63 percent of the housing were in the incorporated areas of Franklin County. More detailed data are needed to fully describe the housing conditions in the jurisdictions described here. 13 refs., 9 tabs.« less

  14. Group sequential designs for stepped-wedge cluster randomised trials

    PubMed Central

    Grayling, Michael J; Wason, James MS; Mander, Adrian P

    2017-01-01

    Background/Aims: The stepped-wedge cluster randomised trial design has received substantial attention in recent years. Although various extensions to the original design have been proposed, no guidance is available on the design of stepped-wedge cluster randomised trials with interim analyses. In an individually randomised trial setting, group sequential methods can provide notable efficiency gains and ethical benefits. We address this by discussing how established group sequential methodology can be adapted for stepped-wedge designs. Methods: Utilising the error spending approach to group sequential trial design, we detail the assumptions required for the determination of stepped-wedge cluster randomised trials with interim analyses. We consider early stopping for efficacy, futility, or efficacy and futility. We describe first how this can be done for any specified linear mixed model for data analysis. We then focus on one particular commonly utilised model and, using a recently completed stepped-wedge cluster randomised trial, compare the performance of several designs with interim analyses to the classical stepped-wedge design. Finally, the performance of a quantile substitution procedure for dealing with the case of unknown variance is explored. Results: We demonstrate that the incorporation of early stopping in stepped-wedge cluster randomised trial designs could reduce the expected sample size under the null and alternative hypotheses by up to 31% and 22%, respectively, with no cost to the trial’s type-I and type-II error rates. The use of restricted error maximum likelihood estimation was found to be more important than quantile substitution for controlling the type-I error rate. Conclusion: The addition of interim analyses into stepped-wedge cluster randomised trials could help guard against time-consuming trials conducted on poor performing treatments and also help expedite the implementation of efficacious treatments. In future, trialists should consider incorporating early stopping of some kind into stepped-wedge cluster randomised trials according to the needs of the particular trial. PMID:28653550

  15. Interim analysis of survival in a prospective, multi-center registry cohort of cutaneous melanoma tested with a prognostic 31-gene expression profile test.

    PubMed

    Hsueh, Eddy C; DeBloom, James R; Lee, Jonathan; Sussman, Jeffrey J; Covington, Kyle R; Middlebrook, Brooke; Johnson, Clare; Cook, Robert W; Slingluff, Craig L; McMasters, Kelly M

    2017-08-29

    A 31-gene expression profile (GEP) test that provides risk classification of cutaneous melanoma (CM) patients has been validated in several retrospective studies. The objective of the reported study was a prospective evaluation of the GEP performance in patients enrolled in two clinical registries. Three-hundred twenty two CM patients enrolled in the EXPAND (NCT02355587) and INTEGRATE (NCT02355574) registries met the criteria of age ≥ 16 years, successful GEP result and ≥1 follow-up visit for inclusion in this interim analysis. Primary endpoints were recurrence-free (RFS), distant metastasis-free (DMFS), and overall survival (OS). Median follow-up was 1.5 years for event-free patients. Median age for subjects was 58 years (range 18-87) and median Breslow thickness was 1.2 mm (range 0.2-12.0). Eighty-eight percent (282/322) of cases had stage I/II disease and 74% (237/322) had a SLN biopsy. Seventy-seven percent (248/322) had class 1 molecular profiles. 1.5-year RFS, DMFS, and OS rates were 97 vs. 77%, 99 vs. 89%, and 99 vs. 92% for class 1 vs. class 2, respectively (p < 0.0001 for each). Multivariate Cox regression showed Breslow thickness, mitotic rate, and GEP class to significantly predict recurrence (p < 0.01), while tumor thickness was the only significant predictor of distant metastasis and overall survival in this interim analysis. Interim analysis of patient outcomes from a combined prospective cohort supports the 31-gene GEP's ability to stratify early-stage CM patients into two groups with significantly different metastatic risk. RFS outcomes in this real-world cohort are consistent with previously published analyses with retrospective specimens. GEP testing complements current clinicopathologic features and increases identification of high-risk patients. ClinicalTrials.gov, NCT02355574  and NCT02355587.

  16. Group sequential designs for stepped-wedge cluster randomised trials.

    PubMed

    Grayling, Michael J; Wason, James Ms; Mander, Adrian P

    2017-10-01

    The stepped-wedge cluster randomised trial design has received substantial attention in recent years. Although various extensions to the original design have been proposed, no guidance is available on the design of stepped-wedge cluster randomised trials with interim analyses. In an individually randomised trial setting, group sequential methods can provide notable efficiency gains and ethical benefits. We address this by discussing how established group sequential methodology can be adapted for stepped-wedge designs. Utilising the error spending approach to group sequential trial design, we detail the assumptions required for the determination of stepped-wedge cluster randomised trials with interim analyses. We consider early stopping for efficacy, futility, or efficacy and futility. We describe first how this can be done for any specified linear mixed model for data analysis. We then focus on one particular commonly utilised model and, using a recently completed stepped-wedge cluster randomised trial, compare the performance of several designs with interim analyses to the classical stepped-wedge design. Finally, the performance of a quantile substitution procedure for dealing with the case of unknown variance is explored. We demonstrate that the incorporation of early stopping in stepped-wedge cluster randomised trial designs could reduce the expected sample size under the null and alternative hypotheses by up to 31% and 22%, respectively, with no cost to the trial's type-I and type-II error rates. The use of restricted error maximum likelihood estimation was found to be more important than quantile substitution for controlling the type-I error rate. The addition of interim analyses into stepped-wedge cluster randomised trials could help guard against time-consuming trials conducted on poor performing treatments and also help expedite the implementation of efficacious treatments. In future, trialists should consider incorporating early stopping of some kind into stepped-wedge cluster randomised trials according to the needs of the particular trial.

  17. Adaptive Clinical Trials: Advantages and Disadvantages of Various Adaptive Design Elements.

    PubMed

    Korn, Edward L; Freidlin, Boris

    2017-06-01

    There is a wide range of adaptive elements of clinical trial design (some old and some new), with differing advantages and disadvantages. Classical interim monitoring, which adapts the design based on early evidence of superiority or futility of a treatment arm, has long been known to be extremely useful. A more recent application of interim monitoring is in the use of phase II/III designs, which can be very effective (especially in the setting of multiple experimental treatments and a reliable intermediate end point) but do have the cost of having to commit earlier to the phase III question than if separate phase II and phase III trials were performed. Outcome-adaptive randomization is an older technique that has recently regained attention; it increases trial complexity and duration without offering substantial benefits to the patients in the trial. The use of adaptive trials with biomarkers is new and has great potential for efficiently identifying patients who will be helped most by specific treatments. Master protocols in which trial arms and treatment questions are added to an ongoing trial can be especially efficient in the biomarker setting, where patients are screened for entry into different subtrials based on evolving knowledge about targeted therapies. A discussion of three recent adaptive clinical trials (BATTLE-2, I-SPY 2, and FOCUS4) highlights the issues. Published by Oxford University Press 2017. This work is written by US Government employees and is in the public domain in the US.

  18. Whole genome sequence analysis of Geitlerinema sp. FC II unveils competitive edge of the strain in marine cultivation system for biofuel production.

    PubMed

    Batchu, Navish Kumar; Khater, Shradha; Patil, Sonal; Nagle, Vinod; Das, Gautam; Bhadra, Bhaskar; Sapre, Ajit; Dasgupta, Santanu

    2018-03-05

    A filamentous cyanobacteria, Geitlerinema sp. FC II, was isolated from marine algae culture pond at Reliance Industries Limited (RIL), India. The 6.7 Mb draft genome of FC II encodes for 6697 protein coding genes. Analysis of the whole genome sequence revealed presence of nif gene cluster, supporting its capability to fix atmospheric nitrogen. FC II genome contains two variants of sulfide:quinone oxidoreductases (SQR), which is a crucial elector donor in cyanobacterial metabolic processes. FC II is characterized by the presence of multiple CRISPR- Cas (Clustered Regularly Interspaced Short Palindrome Repeats - CRISPR associated proteins) clusters, multiple variants of genes encoding photosystem reaction centres, biosynthetic gene clusters of alkane, polyketides and non-ribosomal peptides. Presence of these pathways will help FC II in gaining an ecological advantage over other strains for biomass production in large scale cultivation system. Hence, FC II may be used for production of biofuel and other industrially important metabolites. Copyright © 2018 Elsevier Inc. All rights reserved.

  19. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 2 2011-01-01 2011-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or...

  20. 5 CFR 772.102 - Interim personnel actions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Interim personnel actions. 772.102 Section 772.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) INTERIM RELIEF General § 772.102 Interim personnel actions. When an employee or...

  1. Multi-reverse flow injection analysis integrated with multi-optical sensor for simultaneous determination of Mn(II), Fe(II), Cu(II) and Fe(III) in natural waters.

    PubMed

    Youngvises, Napaporn; Suwannasaroj, Kittigan; Jakmunee, Jaroon; AlSuhaimi, Awadh

    2017-05-01

    Multi-reverse flow injection analysis (Mr-FIA) integrated with multi-optical sensor was developed and optimized for the simultaneous determination of multi ions; Mn(II), Fe(II), Cu(II) and Fe(III) in water samples. The sample/standard solutions were propelled making use of a four channels peristaltic pump whereas 4 colorimetric reagents specific for the metal ions were separately injected in sample streams using multi-syringe pump. The color zones that formed in the individual mixing coils were then streamed into multi-channels spectrometer, which comprised of four flows through cell and four pairs of light emitting diode and photodiode, whereby signals were measured concurrently. The linearity range (along with detection limit, µgL -1 ) was 0.050-3.0(16), 0.30-2.0 (11), 0.050-1.0(12) and 0.10-1.0(50)mgL -1 , for Mn(II), Fe(II), Cu(II) and Fe(III), respectively. In the interim, the correlation coefficients were 0.9924-0.9942. The percentages relative standard deviation was less than 3. The proposed system was applied successfully to determine targeted metal ions simultaneously in natural water with high sample throughput and low reagent consumption, thus it satisfies the criteria of Green Analytical Chemistry (GAC) and its goals. Copyright © 2016 Elsevier B.V. All rights reserved.

  2. Interim Expertise

    ERIC Educational Resources Information Center

    Anyaso, Hilary Hurd

    2009-01-01

    The Registry for College and University Presidents places former executives in interim presidential and other senior-level posts and is familiar with the challenges interim executives and institutions encounter in times of leadership transitions. However, the one big advantage interims bring to institutions, says Registry Vice President Kevin J.…

  3. 40 CFR 155.56 - Interim registration review decision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Interim registration review decision... PROGRAMS REGISTRATION STANDARDS AND REGISTRATION REVIEW Registration Review Procedures § 155.56 Interim registration review decision. The Agency may issue, when it determines it to be appropriate, an interim...

  4. Explanation of Significant Differences for the Record of Decision for Interim Actions in Zone 1, East Tennessee Technology Park, Oak Ridge, Tennessee

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bechtel Jacobs

    2011-02-01

    Zone 1 is a 1400-acre area outside the fence of the main plant at The East Tennessee Technology Park (ETTP) in Oak Ridge, Tennessee. The Record of Decision for Interim Actions in Zone, ETTP (Zone 1 Interim ROD) (DOE 2002) identifies the remedial actions for contaminated soil, buried waste, and subsurface infrastructure necessary to protect human health and to limit further contamination of groundwater. Since the Zone 1 Interim Record of Decision (ROD) was signed, new information has been obtained that requires the remedy to be modified as follows: (1) Change the end use in Contractor's Spoil Area (CSA) frommore » unrestricted industrial to recreational; (2) Remove Exposure Units (EU5) ZI-50, 51, and 52 from the scope of the Zone I Interim ROD; (3) Change the end use of the duct bank corridor from unrestricted industrial to restricted industrial; and (4) Remove restriction for the disturbance of soils below 10 feet in Exposure Unit (EU) Z1-04. In accordance with 40 Code of Federal Regulations (CFR) 300.435, these scope modifications are a 'significant' change to the Zone 1 Interim ROD. In accordance with CERCLA Sect. 117 (c) and 40 CFR 300.435 (c)(2)(i), such a significant change is documented with an Explanation of Significant Differences (ESD). The purpose of this ESD is to make the changes listed above. This ESD is part of the Administrative Record file, and it, and other information supporting the selected remedy, can be found at the DOE Information Center, 475 Oak Ridge Turnpike, Oak Ridge, Tennessee 37830, from 8:00 a.m. to 5:00 p.m., Monday through Friday. The ORR is located in Roane and Anderson counties, within and adjacent to the corporate city limits of Oak Ridge, Tennessee. ETTP is located in Roane County near the northwest corner of the ORR. ETTP began operation during World War II as part of the Manhattan Project. The original mission of ETTP was to produce enriched uranium for use in atomic weapons. The plant produced enriched uranium from 1945 until 1985. Uranium production was terminated in 1987. ORR was placed on the National Priorities List in 1989, so remediation activities are conducted under CERCLA. The primary contaminants of concern at ETTP follow: (1) In groundwater - volatile organic compounds (VOCs) at multiple locations (trichloroethene is generally the most prevalent compound); (2) In sediment - inorganic elements, radionuclides, and polychlorinated biphenyls; (3) In soil - inorganic elements, radionuclides, semivolatile organic compounds (particularly the polycyclic aromatic hydrocarbons), and VOCs; and (4) In facilities - radionuclides and polychlorinated biphenyls (abandoned facilities also pose a safety and health hazard to workers.) The purposes of the remedial actions selected in the Zone 1 Interim ROD are to allow unrestricted industrial use down to 10 feet and to remediate potential sources of groundwater contamination. Following is a summary of the major components of the Zone 1 Interim ROD remedy: (1) Excavation of the Blair Quarry burial area and associated contaminated soil; (2) Excavation of miscellaneous contaminated soil in the K-895 Cylinder Destruct Facility area and in the Powerhouse Area; (3) Removal of sludge and demolition of the K-710 sludge beds and Imhoff tanks; (4) Implementation of land use controls (LUCs); and (5) Characterization of soil and remediation of areas that exceed remediation levels.« less

  5. Immunotherapy for recurrent malignant glioma: an interim report on survival.

    PubMed

    Ingram, M; Buckwalter, J G; Jacques, D B; Freshwater, D B; Abts, R M; Techy, G B; Miyagi, K; Shelden, C H; Rand, R W; English, L W

    1990-12-01

    We present interim survival data for a group of 83 adult patients with recurrent malignant glioma treated by implanting stimulated autologous lymphocytes into the tumour bed following surgical debulking. The patients were treated 6 months or more prior to data analysis. Fifty-nine patients were male and 24 female. The mean age for the entire group was 48.4 years and the mean Karnofsky rating (KR) was 67.2. Eight of the patients had grade II tumours, 33 had grade III tumours and 42 had grade IV tumours. Statistical analysis focuses on tumour grade, KR and patient age, factors that have been shown to affect survival in previous studies. Multifactorial analyses are employed to identify interrelationships among factors related to survival. Seven patients (8%) did not respond to immunotherapy, 76 (92%) had a good initial response. Twenty-five patients (30.1%) are living and 18 (22%) have shown no evidence of recurrence. Results are evaluated in the light of those obtained in trials of other experimental therapies for recurrent malignant gliomas. It is concluded that the present protocol offers a safe and comparatively effective treatment option.

  6. 17 CFR 210.8-03 - Interim financial statements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... (§ 249.308(a) of this chapter) must be reviewed by an independent public accountant using professional... interim financial statements have been reviewed by an independent public accountant, a report of the accountant on the review must be filed with the interim financial statements. Interim financial statements...

  7. 24 CFR 35.1330 - Interim controls.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Interim controls. 35.1330 Section... Lead-Paint Hazard Evaluation and Hazard Reduction Activities § 35.1330 Interim controls. Interim controls of lead-based paint hazards identified in a risk assessment shall be conducted in accordance with...

  8. 7 CFR 1738.21 - Interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1738.21 Section 1738.21... Interim financing. (a) Upon notification by RUS that an applicant's application is considered complete, the applicant may enter into an interim financing agreement with a lender other than RUS or use its...

  9. From Euclid as Textbook to the Giovanni Gentile Reform (1867-1923): Problems, Methods and Debates in Mathematics Teaching in Italy

    ERIC Educational Resources Information Center

    Giacardi, Livia

    2006-01-01

    The earliest legislation aimed to give comprehensive organization to the Italian education system was the Casati law, from the name of the then Minister for Education Gabrio Casati who drafted it. Promulgated by King Vittorio Emanuele II on 13 November 1859, the new law was designed to reorganize the school system in Piedmont and Lombardy, and was…

  10. Cargo Movement Operations System (CMOS) Updated Draft Software Requirements Specification (Applications CSCI) Increment II

    DTIC Science & Technology

    1990-11-29

    appropriate to combine them into one paragraph. CMOS PMO ACCEPTS COY24ENT: YES [ ] NO [ ] ERCI ACCEPTS COMMENT: YES [ ] NO [ ] COMMENT DISPOSITION: COMMENT...COMMENT: YES [ ] NO [ ] ERCI ACCEPTS COMMENT: YES [ ] NO [ ] COMMENT DISPOSITION: COMMENT STATUS: OPEN [ ] CLOSED [ ] ORIGINATOR CONTROL NUMBER: SRS1-0004...ERCI ACCEPTS COMMENT: YES [ ] NO [ ] COMMENT DISPOSITION: COMMENT STATUS: OPEN [ ] CLOSED [ ] ORIGINATOR CONTROL NUMBER: SRS1-0005 PROGRAM OFFICE

  11. An Approach for Evaluating the Technical Quality of Interim Assessments

    ERIC Educational Resources Information Center

    Li, Ying; Marion, Scott; Perie, Marianne; Gong, Brian

    2010-01-01

    Increasing numbers of schools and districts have expressed interest in interim assessment systems to prepare for summative assessments and to improve teaching and learning. However, with so many commercial interim assessments available, schools and districts are struggling to determine which interim assessment is most appropriate to their needs.…

  12. 47 CFR 51.611 - Interim wholesale rates.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... selecting a particular discount rate. The same discount percentage rate shall be used to establish interim... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim wholesale rates. 51.611 Section 51.611... Resale § 51.611 Interim wholesale rates. (a) If a state commission cannot, based on the information...

  13. 7 CFR 15a.71 - Interim procedures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 1 2010-01-01 2010-01-01 false Interim procedures. 15a.71 Section 15a.71 Agriculture Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM FEDERAL FINANCIAL ASSISTANCE Procedures (Interim) § 15a.71 Interim procedures. For the purposes of...

  14. 77 FR 55230 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-01; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0068] Japan Lessons-Learned Project Directorate Interim... Commission (NRC). ACTION: Japan Lessons-Learned Project Directorate interim staff guidance; issuance. SUMMARY...-Learned Project Directorate Interim Staff Guidance (JLD-ISG), JLD-ISG-2012-01, ``Compliance with Order EA...

  15. 77 FR 55231 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-02; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0069] Japan Lessons-Learned Project Directorate Interim...-Learned Project Directorate interim staff guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate Interim...

  16. 7 CFR 1735.75 - Interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Interim financing. 1735.75 Section 1735.75... Involving Loan Funds § 1735.75 Interim financing. (a) A borrower may submit a written request for RUS approval of interim financing if it is necessary to close an acquisition before the loan to finance the...

  17. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  18. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  19. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  20. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  1. 13 CFR 120.890 - Source of interim financing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ....890 Section 120.890 Business Credit and Assistance SMALL BUSINESS ADMINISTRATION BUSINESS LOANS Development Company Loan Program (504) Interim Financing § 120.890 Source of interim financing. A Project may... experience or qualifications, SBA may require the interim loan to be managed by a third party such as a bank...

  2. The Archaeology of Coralville Lake, Iowa. Volume 3. Sample Survey (Interim Report 1).

    DTIC Science & Technology

    1985-03-01

    n t ho I aite 19 60 ’ s , Air ian Anderson di rectedl a se-r ies coI Li in a ner e I cd s c1. ooIs v It 1h s tude ntLs f r om the tini v-er’si ty of r...wash cap the surface (Figure 13). 7 0- ii NORTH PROFILE 13 JH 479- UNIT 2 SIL WY 3/ c(HISTOWiCAL ALLUVIUM) stl ~SILT WVITH MINk CLAY JOYN 3/3 SCALE I

  3. Statistics from the Operation of the Low-Level Wind Shear Alert System (LLWAS) during the Joint Airport Weather Studies (JAWS) Project.

    DTIC Science & Technology

    1984-12-01

    AD-RI59 367 STATISTICS FROM THE OPERATION OF THE LOW-LEVEL WIND I/i SHEAR ALERT SYSTEM (L..(U) NATIONAL CENTER FOR ATOMSPHERIC RESEARCH BOULDER CO...NATIONAL BUREAU OF STANDARDS-1963A % % Oh b DOT/FAAIPM-84132 Statistics from the Operation of the Program Engineering Low-Level Wind Shear Alert System and...The Operation of The Low-Level Wind December 1984 Shear Alert System (LLWAS) During The JAWS Project: 6. Performing Organization Code An Interim Report

  4. Oral Historical, Documentary, and Archaeological Investigations of Colbert, Barton, and Vinton, Mississippi: An Interim Report on Phase I of the Tombigbee Historic Townsites Project. Volume II.

    DTIC Science & Technology

    1982-05-01

    newcomer to the area. most of his infor- mation was secondhand . However, person and nlace names h nroi.ied zuiced the initial research for this proiect...written many books on Mississinni -ilstrx.. . imrortance his interview to the project is his concise sv-nopis ,: oca1 li t ,r . ! was most familiar... Books of Insane Hospital, 1371-19&0 (Lowndes and Monroe counties) Business Letters (Insurance Companies) IF72-78, 1375-76, :373 (Clay. Lowndes, and

  5. Development of a Facility Management and Improvement Manual for Army Service Schools.

    DTIC Science & Technology

    1983-03-01

    Ehhhhomhmhhhhlo EEEEEEEohhhhhI L-Ii Ilk . ~MICROCOPY RESOLUTION TEST CHART NATIONAL BURESU Of STA OSN-T63-A NA01BRA FSADRS16- construction m*nilhlli 8mbtg 10b...U.S. Army Construction Engineering Research Lab. P.O. Box 4005 • 4A762731AT41-A-001 Champaign, IL 61820 _ It. CONTROLLING OFFICtNAME AND ADDRESS 37...developing a data collection and analysis method. The prototype method was discussed in CERL Interim Report P-ill. 3 This prototype method was tested by

  6. Role Perceptions of Hispanic and Mainstream Navy Recruits.

    DTIC Science & Technology

    1982-12-01

    ACCESSION NO- 3. R9C’PI’NT’S CATALOG NUMBER 4. TITLE (and Subttl.e) S . TYPE of REPORT & PERIOO COVERED Role Perceptions of Hispanic and M4ainstream Interim...Technical Report Navy Recruits *. PERFORMING ORG. REPORT NUMBER 7. AUTHOR( s ) 6. CONTRACT OR GRANT NUMUER(a) Harry C. Triandis Judith Li3ansky Gerardo...T NU M E R S A Department of Psycholog~y University of Illinois NR 170-906 603 E. Daniel, Chamva.;vn, IL 6182__ II. CONTROLLING OFFICE NAME AND

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This volume contains the interim change notice for physical testing. Covered are: properties of solutions, slurries, and sludges; rheological measurement with cone/plate viscometer; % solids determination; particle size distribution by laser scanning; penetration resistance of radioactive waste; operation of differential scanning calorimeter, thermogravimetric analyzer, and high temperature DTA and DSC; sodium rod for sodium bonded fuel; filling SP-100 fuel capsules; sodium filling of BEATRIX-II type capsules; removal of alkali metals with ammonia; specific gravity of highly radioactive solutions; bulk density of radioactive granular solids; purification of Li by hot gettering/filtration; and Li filling of MOTA capsules.

  8. Probe Array Correction With Strong Target Interactions

    DTIC Science & Technology

    2012-08-01

    exciting each probe array feed with a unit voltage source and computing the short circuit currents, ii, i = 1 , 2 , . . . , 5, at each probe array feed...that only one probe array element has unit terminal currents. In this case I2 = Îi = IN − Y NV 2 = IN − Y N [ Y is + Y N ]− 1 IN = (I − Y N [ Y is + Y...YOUR FORM TO THE ABOVE ADDRESS. 1 . REPORT DATE (DD-MM-YY) 2 . REPORT TYPE 3. DATES COVERED (From - To) August 2012 Interim 01 May 2011 – 31 May

  9. Draft genome sequence of Paraburkholderia tropica Ppe8 strain, a sugarcane endophytic diazotrophic bacterium.

    PubMed

    Silva, Paula Renata Alves da; Simões-Araújo, Jean Luiz; Vidal, Márcia Soares; Cruz, Leonardo Magalhães; Souza, Emanuel Maltempi de; Baldani, José Ivo

    Paraburkholderia tropica (syn Burkholderia tropica) are nitrogen-fixing bacteria commonly found in sugarcane. The Paraburkholderia tropica strain Ppe8 is part of the sugarcane inoculant consortium that has a beneficial effect on yield. Here, we report a draft genome sequence of this strain elucidating the mechanisms involved in its interaction mainly with Poaceae. A genome size of approximately 8.75Mb containing 7844 protein coding genes distributed in 526 subsystems was de novo assembled with ABySS and annotated by RAST. Genes related to the nitrogen fixation process, the secretion systems (I, II, III, IV, and VI), and related to a variety of metabolic traits, such as metabolism of carbohydrates, amino acids, vitamins, and proteins, were detected, suggesting a broad metabolic capacity and possible adaptation to plant association. Copyright © 2017 Sociedade Brasileira de Microbiologia. Published by Elsevier Editora Ltda. All rights reserved.

  10. Clinical guidelines for the treatment of depressive disorders. II. Principles of management.

    PubMed

    Reesal, R T; Lam, R W

    2001-06-01

    The Canadian Psychiatric Association and the Canadian Network for Mood and Anxiety Treatments partnered to produce clinical guidelines for psychiatrists for the treatment of depressive disorders. A standard guidelines development process was followed. Relevant literature was identified using a computerized Medline search supplemented by review of bibliographies. Operational criteria were used to rate the quality of scientific evidence, and the line of treatment recommendations included consensus clinical opinion. This section on "Principles of Management" is 1 of 7 articles drafted and reviewed by clinicians. Revised drafts underwent national and international expert peer review. The principles and goals of psychiatric management with psychotherapy and pharmacotherapy are reviewed. Two phases of treatment, acute and maintenance, are identified. Special topics, including inpatient management, suicide management, and medical-legal issues are also discussed. These principles of psychiatric management provide a framework for the use of specific treatments for depressive disorders.

  11. Development of a Draft Core Set of Domains for Measuring Shared Decision Making in Osteoarthritis: An OMERACT Working Group on Shared Decision Making

    PubMed Central

    Toupin April, Karine; Barton, Jennifer; Fraenkel, Liana; Li, Linda; Grandpierre, Viviane; Guillemin, Francis; Rader, Tamara; Stacey, Dawn; Légaré, France; Jull, Janet; Petkovic, Jennifer; Scholte Voshaar, Marieke; Welch, Vivian; Lyddiatt, Anne; Hofstetter, Cathie; De Wit, Maarten; March, Lyn; Meade, Tanya; Christensen, Robin; Gaujoux-Viala, Cécile; Suarez-Almazor, Maria E.; Boonen, Annelies; Pohl, Christoph; Martin, Richard; Tugwell, Peter

    2015-01-01

    Objective Despite the importance of shared decision making for delivering patient-centred care in rheumatology, there is no consensus on how to measure its process and outcomes. The aim of this OMERACT working group is to determine the core set of domains for measuring shared decision making in intervention studies in adults with osteoarthritis (OA), from the perspective of patients, health professionals and researchers. Methods We followed the OMERACT Filter 2.0 to develop a draft core domain set, which consisted of: (i) forming an OMERACT working group; (ii) conducting a review of domains of shared decision making; and (iii) obtaining the opinions of stakeholders using a modified nominal group process held at a session activity at the OMERACT 2014 meeting. Results 26 stakeholders from Europe, North America and Australia, including 5 patient research partners, participated in the session activity. Participants identified the following domains for measuring shared decision making to be included as part of the Draft Core Set: 1) Identifying the decision; 2) Exchanging Information; 3) Clarifying views; 4) Deliberating; 5) Making the decision; 6) Putting the decision into practice; and 7) Assessing the impact of the decision. Contextual factors were also suggested. Conclusion We propose a Draft Core Set of shared decision making domains for OA intervention research studies. Next steps include a workshop at OMERACT 2016 to reach consensus on these proposed domains in the wider OMERACT group, as well as detail sub-domains and assess instruments to develop a Core Outcome Measurement Set. PMID:25877502

  12. Development of advanced generator of singlet oxygen for a COIL

    NASA Astrophysics Data System (ADS)

    Kodymová, Jarmila; Špalek, Otomar; Jirásek, Vít; Čenský, Miroslav; Hrubý, Jan

    2006-05-01

    The generator of singlet oxygen (SOG) remains still a challenge for a chemical oxygen-iodine laser (COIL). Hitherto, only chemical generators based on the gas-liquid reaction system (chlorine-basic hydrogen peroxide) can supply singlet oxygen, O II(1Δ), in enough high yields and at pressures to maintain operation of the high power supersonic COIL facilities. Employing conventional generators of jet-type or rotating disc-type makes often problems resulting mainly from liquid droplets entrained by an O II (1Δ) stream into the laser cavity, and a limited scalability of these generators. Advanced generator concepts investigated currently are based on two different approaches: (i)O II(1Δ) generation by the electrical discharge in various configurations, eliminating thus a liquid chemistry, and (ii) O II(1Δ) generation by the conventional chemistry in novel configurations offering the SOG efficiency increase and eliminating drawbacks of existing devices. One of the advanced concepts of chemical generator - a spray SOG with centrifugal separation of gasliquid phases - has been proposed and investigated in our laboratory. In this paper we present a description of the generator principle, some essential results of theoretical estimations, and interim experimental results obtained with the spray SOG.

  13. 12 CFR 552.2-2 - Procedures for organization of interim Federal stock association.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Procedures for organization of interim Federal stock association. (a) Applications for permission to organize... chapter or § 552.2-1(b)(3) of this part. (b) Approval of an application for permission to organize an... the interim was chartered to facilitate. Applications for permission to organize an interim Federal...

  14. One map policy (OMP) implementation strategy to accelerate mapping of regional spatial planing (RTRW) in Indonesia

    NASA Astrophysics Data System (ADS)

    Hasyim, Fuad; Subagio, Habib; Darmawan, Mulyanto

    2016-06-01

    A preparation of spatial planning documents require basic geospatial information and thematic accuracies. Recently these issues become important because spatial planning maps are impartial attachment of the regional act draft on spatial planning (PERDA). The needs of geospatial information in the preparation of spatial planning maps preparation can be divided into two major groups: (i). basic geospatial information (IGD), consist of of Indonesia Topographic maps (RBI), coastal and marine environmental maps (LPI), and geodetic control network and (ii). Thematic Geospatial Information (IGT). Currently, mostly local goverment in Indonesia have not finished their regulation draft on spatial planning due to some constrain including technical aspect. Some constrain in mapping of spatial planning are as follows: the availability of large scale ofbasic geospatial information, the availability of mapping guidelines, and human resources. Ideal conditions to be achieved for spatial planning maps are: (i) the availability of updated geospatial information in accordance with the scale needed for spatial planning maps, (ii) the guideline of mapping for spatial planning to support local government in completion their PERDA, and (iii) capacity building of local goverment human resources to completed spatial planning maps. The OMP strategies formulated to achieve these conditions are: (i) accelerating of IGD at scale of 1:50,000, 1: 25,000 and 1: 5,000, (ii) to accelerate mapping and integration of Thematic Geospatial Information (IGT) through stocktaking availability and mapping guidelines, (iii) the development of mapping guidelines and dissemination of spatial utilization and (iv) training of human resource on mapping technology.

  15. Contractors Road Heavy Equipment Area SWMU 055 Corrective Measures Implementation Progress Report Kennedy Space Center, Florida

    NASA Technical Reports Server (NTRS)

    Johnson, Jill W. (Compiler)

    2015-01-01

    This Corrective Measures Implementation (CMI) Progress Report documents: (i) activities conducted as part of supplemental assessment activities completed from June 2009 through November 2014; (ii) Engineering Evaluation (EE) Advanced Data Packages (ADPs); and (iii) recommendations for future activities related to corrective measures at the Site. Applicable meeting minutes are provided as Appendix A. The following EE ADPs for CRHE are included with this CMI Progress Report: center dot Supplemental Site Characterization ADP (Step 1 EE) (Appendix B) center dot Site Characterization ADP (Step 1 EE) for Hot Spot 1 (HS1) (Appendix C) center dot Remedial Alternatives Evaluation (Step 2 EE) ADP for HS1 (Appendix D) center dot Interim Measures Work Plan (Step 3 EE) ADP for HS1 (Appendix E) center dot Site Characterization ADP (Step 1 EE) ADP for Hot Spot 2 (HS2), High Concentration Plume (HCP), and Low Concentration Plume (LCP) (Appendix F) A summary of direct-push technology (DPT) and groundwater monitoring well sampling results are provided in Appendices G and H, respectively. The Interim Land Use Control Implementation Plan (LUCIP) is provided as Appendix I. Monitoring well completion reports, other applicable field forms, survey data, and analytical laboratory reports are provided as Appendices J through M, respectively, in the electronic copy of this document. Selected Site photographs are provided in Appendix N. The interim groundwater monitoring plan and document revision log are included as Appendices O and P, respectively. KSC Electronic Data Deliverable (KEDD) files are provided on the attached compact disk.

  16. 76 FR 14559 - Federal Acquisition Regulation; Justification and Approval of Sole-Source 8(a) Contracts

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-16

    ... Space Administration (NASA). ACTION: Interim rule. SUMMARY: DoD, GSA, and NASA are issuing an interim..., and NASA are issuing an interim rule amending the FAR, to implement section 811 of the National... meetings, DoD, GSA, and NASA weighed the costs and benefits of publishing this rule as proposed or interim...

  17. Interim Administrators in Higher Education: A National Study

    ERIC Educational Resources Information Center

    Huff, Marie Thielke; Neubrander, Judy

    2015-01-01

    The focus of this paper is on the roles and experiences of interim administrators in higher education. A survey was given to current and recent interim administrators in four-year public universities and colleges across the United States. The goals were to identify the advantages and disadvantages of using and serving as interims, and to solicit…

  18. Reducing Risks in Wartime Through Capital-Labor Substitution: Evidence from World War II

    DTIC Science & Technology

    2014-07-17

    reviewing instructions, searching existing data sources, gathering and maintaining the data needed , and completing and reviewing the collection of...denominated in dollars and took into account “the needs of the civilian and industrial economy” (Smith, 1959, pg. 154-8). Most materiel purchases...requirements depending on the need for troops, and Congress restricted the drafting of 18-year-olds and fathers in response to public sympathy but

  19. Message Drafted by General Eisenhower in Case the D-Day Invasion Failed and Photographs Taken on D-Day. The Constitution Community: The Great Depression and World War II (1929-1945).

    ERIC Educational Resources Information Center

    Traill, David

    Planning for "Operation Overlord" had been under way for about a year when General Dwight Eisenhower, commander of all the Allied forces in Europe, was ordered in February 1944 to invade the continent. Thousands of troops from the United States, Great Britain, France, Canada, and other nations were assembled in southern England and…

  20. Review of the transport of selected radionuclides in the interim risk assessment for the Radioactive Waste Management Complex, Waste Area Group 7 Operable Unit 7-13/14, Idaho National Engineering and Environmental Laboratory, Idaho

    USGS Publications Warehouse

    Rousseau, Joseph P.; Landa, Edward R.; Nimmo, John R.; Cecil, L. DeWayne; Knobel, LeRoy L.; Glynn, Pierre D.; Kwicklis, Edward M.; Curtis, Gary P.; Stollenwerk, Kenneth G.; Anderson, Steven R.; Bartholomay, Roy C.; Bossong, Clifford R.; Orr, Brennon R.

    2005-01-01

    The U.S. Department of Energy (DOE) requested that the U.S. Geological Survey conduct an independent technical review of the Interim Risk Assessment (IRA) and Contaminant Screening for the Waste Area Group 7 (WAG-7) Remedial Investigation, the draft Addendum to the Work Plan for Operable Unit 7-13/14 WAG-7 comprehensive Remedial Investigation and Feasibility Study (RI/FS), and supporting documents that were prepared by Lockheed Martin Idaho Technologies, Inc. The purpose of the technical review was to assess the data and geotechnical approaches that were used to estimate future risks associated with the release of the actinides americium, uranium, neptunium, and plutonium to the Snake River Plain aquifer from wastes buried in pits and trenches at the Subsurface Disposal Area (SDA). The SDA is located at the Radioactive Waste Management Complex in southeastern Idaho within the boundaries of the Idaho National Engineering and Environmental Laboratory. Radionuclides have been buried in pits and trenches at the SDA since 1957 and 1952, respectively. Burial of transuranic wastes was discontinued in 1982. The five specific tasks associated with this review were defined in a ?Proposed Scope of Work? prepared by the DOE, and a follow-up workshop held in June 1998. The specific tasks were (1) to review the radionuclide sampling data to determine how reliable and significant are the reported radionuclide detections and how reliable is the ongoing sampling program, (2) to assess the physical and chemical processes that logically can be invoked to explain true detections, (3) to determine if distribution coefficients that were used in the IRA are reliable and if they have been applied properly, (4) to determine if transport model predictions are technically sound, and (5) to identify issues needing resolution to determine technical adequacy of the risk assessment analysis, and what additional work is required to resolve those issues.

  1. 42 CFR 418.307 - Periodic interim payments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (CONTINUED) MEDICARE PROGRAM HOSPICE CARE Payment for Hospice Care § 418.307 Periodic interim payments... payments. The biweekly interim payment amount is based on the total estimated Medicare payments for the...

  2. Draft Environmental Impact Statement. MX Deployment Area Selection and Land Withdrawal/Acquisition DEIS. Volume II. Comparative Analysis of Alternatives.

    DTIC Science & Technology

    1980-12-01

    would increase recreational activities, including ORV use and poaching . The sum of direct and indirect impacts on this species could be significant...months, and increased policing for poaching could reduce the long-term impacts to insignificant or even positive levels. No impacts would be predicted...comparable species found in five counties. Short-term impacts are expected from poaching and ORVs. The prairie chicken will likely reoccupy habitat

  3. A Methodology for Selection of a Satellite Servicing Architecture. Volume 3. Appendices.

    DTIC Science & Technology

    1985-12-01

    draft copies of this work is greatly appreciated. Dis DII ii, I - A special measure of gratitude belongs to Major Dennis Clark for his help with...bute pair when its complementary set changed values, that pair of attributes can be considered PPI of its complemen- tary set. It is recommended that...a system. 2-2 Mission Accomplishment: The system is desired to accomplish its mission by meeting various specifica- tions. These specifications

  4. Town Brook Local Protection, Massachusetts Coastal Streams: Feasibility Report for Water Resources Development. Volume II. Appendices.

    DTIC Science & Technology

    1980-09-01

    Improved transportation routes are an essential element to the success of the downtown revitalization. A Crosstown Connector, as mentioned earlier, is...with the normal flow of traffic and people in the central shopping distrit. Some ecnomic losses would be felt by commercial establishments whose business...and 20, 1980, by Mr. Adler and we have received a draft copy. The revised plan essentially eliminates our concerns about adverse impacts. We were

  5. Demonstration, testing, & evaluation of in situ heating of soil. Draft final report, Volume II: Appendices A to E

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dev, H.; Enk, J.; Jones, D.

    This document is a draft final report for US DOE contract entitled, {open_quotes}Demonstration Testing and Evaluation of In Situ Soil Heating,{close_quotes} Contract No. DE-AC05-93OR22160, IITRI Project No. C06787. This report is presented in two volumes. Volume I contains the technical report This document is Volume II, containing appendices with background information and data. In this project approximately 300 cu. yd. of clayey soil containing a low concentration plume of volatile organic chemicals was heated in situ by the application of electrical energy. It was shown that as a result of heating the effective permeability of soil to air flow wasmore » increased such that in situ soil vapor extraction could be performed. The initial permeability of soil was so low that the soil gas flow rate was immeasurably small even at high vacuum levels. When scaled up, this process can be used for the environmental clean up and restoration of DOE sites contaminated with VOCs and other organic chemicals boiling up to 120{degrees}to 130{degrees}C in the vadose zone. Although it may applied to many types of soil formations, it is particularly attractive for low permeability clayey soil where conventional in situ venting techniques are limited by low air flow.« less

  6. Cuyahoga River, Ohio Restoration Study. Third Interim Preliminary Feasibility Report on Erosion and Sedimentation. Volume II. Appendices A through H.

    DTIC Science & Technology

    1981-04-01

    land occurs in undeveloped areas of the parks systems* Woodland. Land that is primarily used to produce adapted wood crops and to provide tree cover for...Filling & Dumping Area 4 26-2 Contruction Area 30 26-3 Construction Area 2 27-1 Construction Area 4 27-2 Construction Area 40 27-3 Construction Area 5 A...or white pine. The cost of this BMP is approximately $150 per acre. C-61 Wood laiid l iprovteintit. Thh; IIP il volves selectIve thinning of maple

  7. Research on Fire-Resistant Diesel Fuel.

    DTIC Science & Technology

    1981-12-01

    1[ >1 1? 1F RESEARCH ON FIRE-RESISTANT DIESEL FUEL INTERIM REPORT AFLRL No. 145 By W.D. Weatherford, Jr. G.E. Fodor M.D. Kanakia D.W. Naegeli B.R...GRANT NUMBER(S) W.D. Weatherford, Jr., G.E. Fodor, DAAK7O-80-C-OOO1 M.D. Kanakia, D.W. Naegeli , B.R. Wright (AFLRL) DAAK7O-82-C-OOO1 andF.W...Filters in Fuel Systems of U.S. Army Vehicles I:I , i , , , =- 111 REFERENCES 1. Weatherford, W.D., Jr. Fodor, G.E., Naegeli , D.W., Owens, E.C., Wright

  8. Privacy and Biobanking in China: A Case of Policy in Transition.

    PubMed

    Chen, Haidan; Chan, Benny; Joly, Yann

    2015-01-01

    Disease-based biobanks have operated in hospitals and research institutes in China for decades, and China has recently embarked on a plan to establish further biobank networks with the aim of promoting data sharing among the existing biobanks. Although the Chinese Constitution has only recently begun to recognize individual privacy as a distinct and independent constitutional right, biobanking in China has been loosely regulated under a patchwork of sometimes overlapping laws (such as the Interim Measures for the Administration of Human Genetic Resources) and regulatory instruments, as well as and the policies of individual biobanks and networks of biobanks (such as the Shanghai Biobank Network Guidelines). A Draft Ordinance on Human Genetics Resources is currently being developed that will deal in more detail than previous laws with issues such as management measures, legal liability, and punishment for violations. International data sharing will be tightly regulated under this new law, and individual biobanks' policies such as the Shanghai Guidelines may choose to regulate such sharing even more. In contrast with national regulatory instruments, the Shanghai Guidelines also contain detailed de-identification policies, and explicitly endorse broad consent. © 2015 American Society of Law, Medicine & Ethics, Inc.

  9. P2Pro(RSM) : a computerized management tool for implementing DOE's authorized release process for radioactive scrap metals.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arnish, J.; Chen, S. Y.; Kamboj, S.

    1999-07-22

    Within the next few decades, several hundred thousand tons of metal and several million cubic meters of concrete are expected to be removed from nuclear facilities across the US Department of Energy (DOE) complex as a result of decontamination and decommissioning (D&D) activities. These materials, together with large quantities of tools, equipment, and other items that are commonly recovered from site cleanup or D&D activities, constitute non-real properties that warrant consideration for release from regulatory control for reuse or recycle, as permitted and practiced under current DOE policy. The provisions for implementing this policy are contained in the Draft Handbookmore » for Controlling Release for Reuse or Recycle of Non-Real Property Containing Residual Radioactive Material published by DOE in 1997 and distributed to DOE Field Offices for interim use and implementation. This manual describes a computer management tool, P2Pro(RSM), that implements the first 5 steps of the 10-step process stipulated by the Handbook. P2Pro(RSM) combines an easy-to-use Windows interface with a comprehensive database to facilitate the development of authorized release limits for non-real property.« less

  10. New anti-rebate legislation in South Korea.

    PubMed

    Yu, Su-Yeon; Yang, Bong-Min; Kim, Jin-Hyun

    2013-08-01

    The South Korean Government recently announced a reform in the drug anti-rebate law, with the purpose of eradicating pervasive, unethical, and illegal rebate practices in pharmaceutical marketing. The main objective of this reform is to have the ability to bring criminal charges against doctors and pharmacists for receiving illegal kickbacks from drug companies. Previously, provision of illegal kickbacks by drug companies led to criminal punishment of the drug companies alone, leaving doctors and pharmacists unpunished as the recipients. With the introduction of the "Dual Punishment System (DPS)" reform, criminal punishment for illegal rebates is extended to those receiving illegal kickbacks. Although bitter controversy erupted among stakeholders when the reform was first drafted, a civic group participated in the reform process and effectively influenced the legislative process to a successful end. Some interim outcomes from the DPS in terms of bringing illegal practices to account have already been reported since the policy's implementation in November 2010. The reform background, goals, potential issues, and policy implications are explored in this study with the objective of providing further insight into drug policy for other countries that face similar challenges in the area of drug marketing.

  11. Standards for QUality Improvement Reporting Excellence 2.0: revised publication guidelines from a detailed consensus process.

    PubMed

    Ogrinc, Greg; Davies, Louise; Goodman, Daisy; Batalden, Paul; Davidoff, Frank; Stevens, David

    2016-02-01

    Since the publication of Standards for QUality Improvement Reporting Excellence (SQUIRE 1.0) guidelines in 2008, the science of the field has advanced considerably. In this article, we describe the development of SQUIRE 2.0 and its key components. We undertook the revision between 2012 and 2015 using (1) semistructured interviews and focus groups to evaluate SQUIRE 1.0 plus feedback from an international steering group, (2) two face-to-face consensus meetings to develop interim drafts, and (3) pilot testing with authors and a public comment period. SQUIRE 2.0 emphasizes the reporting of three key components of systematic efforts to improve the quality, value, and safety of health care: the use of formal and informal theory in planning, implementing, and evaluating improvement work; the context in which the work is done; and the study of the intervention(s). SQUIRE 2.0 is intended for reporting the range of methods used to improve health care, recognizing that they can be complex and multidimensional. It provides common ground to share these discoveries in the scholarly literature (www.squire-statement.org). Copyright © 2016 The Authors. Published by Elsevier Inc. All rights reserved.

  12. Replacement of a hopeless maxillary central incisor: a technique for the fabrication of an immediate implant-supported interim restoration.

    PubMed

    Graiff, Lorenzo; Vigolo, Paolo

    2012-04-01

    Placement of a dental implant and an interim restoration in the esthetic zone immediately following tooth extraction is now a common procedure. However, in such clinical situations, the fabrication of an appropriate interim restoration may be challenging. The aim of this article is to present a technique for modifying the extracted tooth so it can be used as an implant-supported interim restoration.

  13. International validation study for interim PET in ABVD-treated, advanced-stage hodgkin lymphoma: interpretation criteria and concordance rate among reviewers.

    PubMed

    Biggi, Alberto; Gallamini, Andrea; Chauvie, Stephane; Hutchings, Martin; Kostakoglu, Lale; Gregianin, Michele; Meignan, Michel; Malkowski, Bogdan; Hofman, Michael S; Barrington, Sally F

    2013-05-01

    At present, there are no standard criteria that have been validated for interim PET reporting in lymphoma. In 2009, an international workshop attended by hematologists and nuclear medicine experts in Deauville, France, proposed to develop simple and reproducible rules for interim PET reporting in lymphoma. Accordingly, an international validation study was undertaken with the primary aim of validating the prognostic role of interim PET using the Deauville 5-point score to evaluate images and with the secondary aim of measuring concordance rates among reviewers using the same 5-point score. This paper focuses on the criteria for interpretation of interim PET and on concordance rates. A cohort of advanced-stage Hodgkin lymphoma patients treated with doxorubicin, bleomycin, vinblastine, and dacarbazine (ABVD) were enrolled retrospectively from centers worldwide. Baseline and interim scans were reviewed by an international panel of 6 nuclear medicine experts using the 5-point score. Complete scan datasets of acceptable diagnostic quality were available for 260 of 440 (59%) enrolled patients. Independent agreement among reviewers was reached on 252 of 260 patients (97%), for whom at least 4 reviewers agreed the findings were negative (score of 1-3) or positive (score of 4-5). After discussion, consensus was reached in all cases. There were 45 of 260 patients (17%) with positive interim PET findings and 215 of 260 patients (83%) with negative interim PET findings. Thirty-three interim PET-positive scans were true-positive, and 12 were false-positive. Two hundred three interim PET-negative scans were true-negative, and 12 were false-negative. Sensitivity, specificity, and accuracy were 0.73, 0.94, and 0.91, respectively. Negative predictive value and positive predictive value were 0.94 and 0.73, respectively. The 3-y failure-free survival was 83%, 28%, and 95% for the entire population and for interim PET-positive and -negative patients, respectively (P < 0.0001). The agreement between pairs of reviewers was good or very good, ranging from 0.69 to 0.84 as measured with the Cohen kappa. Overall agreement was good at 0.76 as measured with the Krippendorf α. The 5-point score proposed at Deauville for reviewing interim PET scans in advanced Hodgkin lymphoma is accurate and reproducible enough to be accepted as a standard reporting criterion in clinical practice and for clinical trials.

  14. Publishing interim results of randomised clinical trials in peer-reviewed journals.

    PubMed

    Counsell, Nicholas; Biri, Despina; Fraczek, Joanna; Hackshaw, Allan

    2017-02-01

    Interim analyses of randomised controlled trials are sometimes published before the final results are available. In several cases, the treatment effects were noticeably different after patient recruitment and follow-up completed. We therefore conducted a literature review of peer-reviewed journals to compare the reported treatment effects between interim and final publications and to examine the magnitude of the difference. We performed an electronic search of MEDLINE from 1990 to 2014 (keywords: 'clinical trial' OR 'clinical study' AND 'random*' AND 'interim' OR 'preliminary'), and we manually identified the corresponding final publication. Where the electronic search produced a final report in which the abstract cited interim results, we found the interim publication. We also manually searched every randomised controlled trial in eight journals, covering a range of impact factors and general medical and specialist publications (1996-2014). All paired articles were checked to ensure that the same comparison between interventions was available in both. In all, 63 studies are included in our review, and the same quantitative comparison was available in 58 of these. The final treatment effects were smaller than the interim ones in 39 (67%) trials and the same size or larger in 19 (33%). There was a marked reduction, defined as a ≥20% decrease in the size of the treatment effect from interim to final analysis, in 11 (19%) trials compared to a marked increase in 3 (5%), p = 0.057. The magnitude of percentage change was larger in trials where commercial support was reported, and increased as the proportion of final events at the interim report decreased in trials where commercial support was reported (interaction p = 0.023). There was no evidence of a difference between trials that stopped recruitment at the interim analysis where this was reported as being pre-specified versus those that were not pre-specified (interaction p = 0.87). Published interim trial results were more likely to be associated with larger treatment effects than those based on the final report. Publishing interim results should be discouraged, in order to have reliable estimates of treatment effects for clinical decision-making, regulatory authority reviews and health economic analyses. Our work should be expanded to include conference publications and manual searches of additional journal publications.

  15. Different predictive values of interim 18F-FDG PET/CT in germinal center like and non-germinal center like diffuse large B-cell lymphoma.

    PubMed

    Kim, Jihyun; Lee, Jeong-Ok; Paik, Jin Ho; Lee, Won Woo; Kim, Sang Eun; Song, Yoo Sung

    2017-01-01

    Diffuse large B-cell lymphoma (DLBCL) is a pathologically heterogeneous disease with different prognoses according to its molecular profiles. Despite the broad usage of 18 F-fluoro-2-dexoxy-D-glucose (FDG) positron emission tomography/computed tomography (PET/CT), previous studies that have investigated the value of interim 18 F-FDG PET/CT in DLBCL have given the controversial results. The purpose of this study was to evaluate the prognostic value of interim 18 F-FDG PET/CT in DLBCL according to germinal center B cell-like (GCB) and non-GCB molecular profiling. We enrolled 118 newly diagnosed DLBCL patients treated with rituximab, cyclophosphamide, doxorubicin, vincristine, and prednisolone (R-CHOP). Interim 18 F-FDG PET/CT scans performed after 2 or 3 cycles of R-CHOP treatment were evaluated based on the Lugano response criteria. Patients were grouped as GCB or non-GCB molecular subtypes according to immunohistochemistry results of CD10, BCL6, and MUM1, based on Hans' algorithm. In total 118 DLBCL patients, 35 % were classified as GCB, and 65 % were classified as non-GCB. Interim PET/CT was negative in 70 %, and positive in 30 %. During the median follow-up period of 23 months, the positive interim 18 F-FDG PET/CT group showed significantly inferior progression free survival (PFS) compared to the negative interim 18 F-FDG PET/CT group (P = 0.0004) in entire patients. A subgroup analysis according to molecular profiling demonstrated significant difference of PFS between the positive and negative interim 18 F-FDG PET groups in GCB subtype of DLBCL (P = 0.0001), but there was no significant difference of PFS between the positive and negative interim 18 F-FDG PET groups in non-GCB subtype of DLBCL. Interim 18 F-FDG PET/CT scanning had a significant predictive value for disease progression in patients with the GCB subtype of DLBCL treated with R-CHOP, but not in those with the non-GCB subtype. Therefore, molecular profiles of DLBCL should be considered for interim 18 F-FDG PET/CT practice.

  16. Implementing the Biopharmaceutics Classification System in Drug Development: Reconciling Similarities, Differences, and Shared Challenges in the EMA and US-FDA-Recommended Approaches.

    PubMed

    Cardot, J-M; Garcia Arieta, A; Paixao, P; Tasevska, I; Davit, B

    2016-07-01

    The US-FDA recently posted a draft guideline for industry recommending procedures necessary to obtain a biowaiver for immediate-release oral dosage forms based on the Biopharmaceutics Classification System (BCS). This review compares the present FDA BCS biowaiver approach, with the existing European Medicines Agency (EMA) approach, with an emphasis on similarities, difficulties, and shared challenges. Some specifics of the current EMA BCS guideline are compared with those in the recently published draft US-FDA BCS guideline. In particular, similarities and differences in the EMA versus US-FDA approaches to establishing drug solubility, permeability, dissolution, and formulation suitability for BCS biowaiver are critically reviewed. Several case studies are presented to illustrate the (i) challenges of applying for BCS biowaivers for global registration in the face of differences in the EMA and US-FDA BCS biowaiver criteria, as well as (ii) challenges inherent in applying for BCS class I or III designation and common to both jurisdictions.

  17. Guidance: Interim Municipal Settlement Policy

    EPA Pesticide Factsheets

    Interim guidance and fact sheets regarding settlements involving municipalities or municipal waste under Section 122 CERCLA as amended by SARA. Interim policy sets forth the criteria by which EPA generally determines whether to exercise enforcement discretion to pursue MSW generators and transporters as PRPs.

  18. STS-52 deployment of LAGEOS / IRIS spacecraft from OV-102's payload bay (PLB)

    NASA Technical Reports Server (NTRS)

    1992-01-01

    During STS-52 deployment activities, the Italian Research Interim Stage (IRIS), a spinning solid fuel rocket, lifts the Laser Geodynamic Satellite II (LAGEOS II) out of its support cradle and above the thermal shield aboard Columbia, Orbiter Vehicle (OV) 102. The remote manipulator system (RMS) arm, with Material Exposure in Low Earth Orbit (MELEO), is positioned above the port side sill longeron. On the mission-peculiar equipment support structure (MPESS) carriers in the center foreground is the United States (U.S.) Microgravity Payload 1 (USMP-1) with Space Acceleration Measurement System (SAMS), MEPHISTO (its French abbreviation), Lambda Point Experiment (LPE) cryostat assembly (identified by JPL insignia), and LPE vacuum maintenance assembly. Other payload bay (PLB) experiments visible in this image include: (on the starboard wall (left)) the Canadian Experiments 2 (CANEX-2) Space Vision System (SVS) Canadian Target Assembly (CTA) (foreground) and the Attitude Sensor Package (ASP);

  19. Accounting for interim safety monitoring of an adverse event upon termination of a clinical trial.

    PubMed

    Dallas, Michael J

    2008-01-01

    Upon termination of a clinical trial that uses interim evaluations to determine whether the trial can be stopped, a proper statistical analysis must account for the interim evaluations. For example, in a group-sequential design where the efficacy of a treatment regimen is evaluated at interim stages, and the opportunity to stop the trial based on positive efficacy findings exists, the terminal p-value, point estimate, and confidence limits of the outcome of interest must be adjusted to eliminate bias. While it is standard practice to adjust terminal statistical analyses due to opportunities to stop for "positive" findings, adjusting due to opportunities to stop for "negative" findings is also important. Stopping rules for negative findings are particularly useful when monitoring a specific rare serious adverse event in trials designed to show safety with respect to the event. In these settings, establishing conservative stopping rules are appropriate, and therefore accounting for the interim monitoring can have a substantial effect on the final results. Here I present a method to account for interim safety monitoring and illustrate its usefulness. The method is demonstrated to have advantages over methodology that does not account for interim monitoring.

  20. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  1. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  2. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  3. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  4. 28 CFR 94.41 - Interim emergency payment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Interim emergency payment. 94.41 Section 94.41 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) CRIME VICTIM SERVICES International Terrorism Victim Expense Reimbursement Program Payment of Claims § 94.41 Interim emergency payment...

  5. 76 FR 4369 - Special Law Enforcement Commissions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-25

    ... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Special Law Enforcement Commissions AGENCY... of the Interim Special Law Enforcement Commission Policy, Rules and Procedures, the Interim Special Law Enforcement Commission Protocols and the Interim Domestic Violence Waiver that will be used by the...

  6. 47 CFR 51.715 - Interim transport and termination pricing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Interim transport and termination pricing. 51... SERVICES (CONTINUED) INTERCONNECTION Reciprocal Compensation for Transport and Termination of Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...

  7. 47 CFR 51.715 - Interim transport and termination pricing.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 3 2011-10-01 2011-10-01 false Interim transport and termination pricing. 51... SERVICES (CONTINUED) INTERCONNECTION Reciprocal Compensation for Transport and Termination of Telecommunications Traffic § 51.715 Interim transport and termination pricing. (a) Upon request from a...

  8. 33 CFR 385.9 - Implementation principles.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...

  9. 33 CFR 385.9 - Implementation principles.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...

  10. 33 CFR 385.9 - Implementation principles.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...

  11. 33 CFR 385.9 - Implementation principles.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of the Plan at specific time intervals during implementation. Interim targets to evaluate progress on... accordance with § 385.39. Interim goals and interim targets shall be consistent with each other. (c... ensure that new information resulting from changed or unforeseen circumstances, new scientific and...

  12. Pediatric Hodgkin Lymphoma Treated at Cancer Institute, Chennai, India: Long-Term Outcome

    PubMed Central

    Dhanushkodi, Manikandan; Ganesan, Trivadi S.; Ganesan, Prasanth; Sundersingh, Shirley; Selvaluxmy, Ganesarajah; Swaminathan, Rajaraman; Rama, Ranganathan; Sagar, Tenali Gnana

    2017-01-01

    Purpose Pediatric Hodgkin lymphoma (HL) is a highly curable malignancy. Outcomes for pediatric HL may vary between developed and developing countries for multiple reasons. This study was conducted to ascertain the outcomes of children with HL at our center and to identify risk factors for recurrent disease. Methods We analyzed the outcomes of 172 consecutive, previously untreated patients with pediatric HL presenting at our center from 2001 to 2010. Patients were treated with either adriamycin, bleomycin, vinblastine, and dacarbazine or adriamycin, bleomycin, vinblastine, cyclophosphamide, vincristine, prednisone, and procarbazine chemotherapy initially, and radiation to bulky sites or a single site of residual disease when appropriate. Results The median duration of follow-up was 77 months. The median age of the patients was 10 years; 127 (74%) of the 172 patients were male. The extent of disease was stage I and II in 59% of the patients. B symptoms were present in 32% of the patients, and 27% had bulky disease. The most common histologic subtype was mixed cellularity (45%). The 5-year overall survival (OS) and progression-free survival (PFS) of the entire cohort were 92.9% and 83.1%, respectively. The 5-year OS rates for patients with stage I, II, III, and IV were 96%, 94.7%, 84%, and 69.8%, respectively. On univariate analysis, advanced stage, response on interim radiologic assessment, and presence of B symptoms significantly predicted inferior PFS and OS. On multivariate analysis, only interim radiologic response significantly predicted PFS (P < .001) and OS (P < .001). Conclusion Overall, the outcomes of patients treated at our center are comparable to those observed in other centers in India and globally. PMID:29094094

  13. NEW BEDFORD, DRAFT 100% DESIGN PLANS FOR CONSTRUCTION, NEW BEDFORD MARINE COMMERCE TERMINAL - STATE ENHANCED REMEDY (SER), 06-06-2012, SDMS# 526331

    EPA Pesticide Factsheets

    2013-06-11

    E D c B A \\ \\ \\ I I I I \\ I I \\ I I I I I I I I I ~x i\\ . I I I I \\ II I I I \\ \\ I I \\ \\ I I I \\ ' I \\ · ~ I I I I I \\ \\ ' \\ \\ I \\ \\ I \\ ,_ I' I \\ I I I I I I I I I J I" I ;:J J J I •IIIII •IIIII I I I I I ~'{; '29''\\N /~ ...

  14. Federal and State Responses to the Emergency Response Communications Program. Draft Report, March 1979.

    DTIC Science & Technology

    1979-06-01

    expansion of terrestrial system meets all planned needs i Department of Housing Under review and Urban Development Department of Interior No baseline...be a suitable addition to table 1.1. SI The cost and available federal support will be important to P the states and will have an effect on our total...Repeater ə Jsystems to expand the system coverage. The attached map shows the existing program and future expansion . II, TECHNICAL DESCRIPTION - i |A

  15. Upper Minnesota River Subbasins Study (Public Law 87-639) (Draft) Reconnaissance Stage Report (Plan of Study).

    DTIC Science & Technology

    1978-09-01

    approximately 30 miles west of the Minnesota border, and flows southeast to Big Stone Lake. From Big Stone Lake the Minnesota River flows southeast to...storage is available in lakes and wetlands in the study area. Average annual runoff varies from 3 inches in the southeast to 1 inch in the northwest...UNCLASSIFIED NL E NI//////IE mIhNI-EIIIIIIE E-EIIIIIIIIIIu EIIIIIIIIIIIIu IIIIIIIIIIIIII II IEEIIEIh U. S. DEPARTMENT OF AGRICULTURE ga Il 0 YELLOW

  16. A systematic review of the reporting of Data Monitoring Committees' roles, interim analysis and early termination in pediatric clinical trials

    PubMed Central

    2009-01-01

    Background Decisions about interim analysis and early stopping of clinical trials, as based on recommendations of Data Monitoring Committees (DMCs), have far reaching consequences for the scientific validity and clinical impact of a trial. Our aim was to evaluate the frequency and quality of the reporting on DMC composition and roles, interim analysis and early termination in pediatric trials. Methods We conducted a systematic review of randomized controlled clinical trials published from 2005 to 2007 in a sample of four general and four pediatric journals. We used full-text databases to identify trials which reported on DMCs, interim analysis or early termination, and included children or adolescents. Information was extracted on general trial characteristics, risk of bias, and a set of parameters regarding DMC composition and roles, interim analysis and early termination. Results 110 of the 648 pediatric trials in this sample (17%) reported on DMC or interim analysis or early stopping, and were included; 68 from general and 42 from pediatric journals. The presence of DMCs was reported in 89 of the 110 included trials (81%); 62 papers, including 46 of the 89 that reported on DMCs (52%), also presented information about interim analysis. No paper adequately reported all DMC parameters, and nine (15%) reported all interim analysis details. Of 32 trials which terminated early, 22 (69%) did not report predefined stopping guidelines and 15 (47%) did not provide information on statistical monitoring methods. Conclusions Reporting on DMC composition and roles, on interim analysis results and on early termination of pediatric trials is incomplete and heterogeneous. We propose a minimal set of reporting parameters that will allow the reader to assess the validity of trial results. PMID:20003383

  17. 78 FR 55339 - Regulatory Capital Rules: Regulatory Capital, Implementation of Basel III, Capital Adequacy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-10

    ...The Federal Deposit Insurance Corporation (FDIC) is adopting an interim final rule that revises its risk-based and leverage capital requirements for FDIC-supervised institutions. This interim final rule is substantially identical to a joint final rule issued by the Office of the Comptroller of the Currency (OCC) and the Board of Governors of the Federal Reserve System (Federal Reserve) (together, with the FDIC, the agencies). The interim final rule consolidates three separate notices of proposed rulemaking that the agencies jointly published in the Federal Register on August 30, 2012, with selected changes. The interim final rule implements a revised definition of regulatory capital, a new common equity tier 1 minimum capital requirement, a higher minimum tier 1 capital requirement, and, for FDIC-supervised institutions subject to the advanced approaches risk-based capital rules, a supplementary leverage ratio that incorporates a broader set of exposures in the denominator. The interim final rule incorporates these new requirements into the FDIC's prompt corrective action (PCA) framework. In addition, the interim final rule establishes limits on FDIC-supervised institutions' capital distributions and certain discretionary bonus payments if the FDIC-supervised institution does not hold a specified amount of common equity tier 1 capital in addition to the amount necessary to meet its minimum risk-based capital requirements. The interim final rule amends the methodologies for determining risk-weighted assets for all FDIC-supervised institutions. The interim final rule also adopts changes to the FDIC's regulatory capital requirements that meet the requirements of section 171 and section 939A of the Dodd-Frank Wall Street Reform and Consumer Protection Act. The interim final rule also codifies the FDIC's regulatory capital rules, which have previously resided in various appendices to their respective regulations, into a harmonized integrated regulatory framework. In addition, the FDIC is amending the market risk capital rule (market risk rule) to apply to state savings associations. The FDIC is issuing these revisions to its capital regulations as an interim final rule. The FDIC invites comments on the interaction of this rule with other proposed leverage ratio requirements applicable to large, systemically important banking organizations. This interim final rule otherwise contains regulatory text that is identical to the common rule text adopted as a final rule by the Federal Reserve and the OCC. This interim final rule enables the FDIC to proceed on a unified, expedited basis with the other federal banking agencies pending consideration of other issues. Specifically, the FDIC intends to evaluate this interim final rule in the context of the proposed well- capitalized and buffer levels of the supplementary leverage ratio applicable to large, systemically important banking organizations, as described in a separate Notice of Proposed Rulemaking (NPR) published in the Federal Register August 20, 2013. The FDIC is seeking commenters' views on the interaction of this interim final rule with the proposed rule regarding the supplementary leverage ratio for large, systemically important banking organizations.

  18. 46 CFR 97.40-10 - Draft marks and draft indicating systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Draft marks and draft indicating systems. 97.40-10... VESSELS OPERATIONS Markings on Vessels § 97.40-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...

  19. 46 CFR 196.40-10 - Draft marks and draft indicating systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 7 2012-10-01 2012-10-01 false Draft marks and draft indicating systems. 196.40-10... VESSELS OPERATIONS Markings on Vessels § 196.40-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...

  20. 46 CFR 78.50-10 - Draft marks and draft indicating systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 3 2013-10-01 2013-10-01 false Draft marks and draft indicating systems. 78.50-10... OPERATIONS Markings on Vessels § 78.50-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or rudderpost or any place...

  1. 46 CFR 97.40-10 - Draft marks and draft indicating systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Draft marks and draft indicating systems. 97.40-10... VESSELS OPERATIONS Markings on Vessels § 97.40-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...

  2. 46 CFR 97.40-10 - Draft marks and draft indicating systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Draft marks and draft indicating systems. 97.40-10... VESSELS OPERATIONS Markings on Vessels § 97.40-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...

  3. 46 CFR 196.40-10 - Draft marks and draft indicating systems.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 7 2013-10-01 2013-10-01 false Draft marks and draft indicating systems. 196.40-10... VESSELS OPERATIONS Markings on Vessels § 196.40-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...

  4. 46 CFR 97.40-10 - Draft marks and draft indicating systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Draft marks and draft indicating systems. 97.40-10... VESSELS OPERATIONS Markings on Vessels § 97.40-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...

  5. 46 CFR 196.40-10 - Draft marks and draft indicating systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Draft marks and draft indicating systems. 196.40-10... VESSELS OPERATIONS Markings on Vessels § 196.40-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...

  6. 46 CFR 78.50-10 - Draft marks and draft indicating systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Draft marks and draft indicating systems. 78.50-10... OPERATIONS Markings on Vessels § 78.50-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or rudderpost or any place...

  7. 46 CFR 78.50-10 - Draft marks and draft indicating systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 3 2014-10-01 2014-10-01 false Draft marks and draft indicating systems. 78.50-10... OPERATIONS Markings on Vessels § 78.50-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or rudderpost or any place...

  8. 46 CFR 78.50-10 - Draft marks and draft indicating systems.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 3 2012-10-01 2012-10-01 false Draft marks and draft indicating systems. 78.50-10... OPERATIONS Markings on Vessels § 78.50-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or rudderpost or any place...

  9. 46 CFR 97.40-10 - Draft marks and draft indicating systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Draft marks and draft indicating systems. 97.40-10... VESSELS OPERATIONS Markings on Vessels § 97.40-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...

  10. 46 CFR 196.40-10 - Draft marks and draft indicating systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Draft marks and draft indicating systems. 196.40-10... VESSELS OPERATIONS Markings on Vessels § 196.40-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...

  11. 46 CFR 78.50-10 - Draft marks and draft indicating systems.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 3 2011-10-01 2011-10-01 false Draft marks and draft indicating systems. 78.50-10... OPERATIONS Markings on Vessels § 78.50-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or rudderpost or any place...

  12. 46 CFR 196.40-10 - Draft marks and draft indicating systems.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 7 2014-10-01 2014-10-01 false Draft marks and draft indicating systems. 196.40-10... VESSELS OPERATIONS Markings on Vessels § 196.40-10 Draft marks and draft indicating systems. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...

  13. 42 CFR 417.574 - Interim settlement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Interim settlement. 417.574 Section 417.574 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... PLANS Medicare Payment: Cost Basis § 417.574 Interim settlement. (a) Determination. Within 30 days...

  14. 14 CFR 136.41 - Interim operating authority.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Interim operating authority. 136.41 Section 136.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... technology, as appropriate, and (9) Shall allow for modifications of the interim operating authority based on...

  15. 14 CFR 136.41 - Interim operating authority.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Interim operating authority. 136.41 Section 136.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... technology, as appropriate, and (9) Shall allow for modifications of the interim operating authority based on...

  16. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 4 2012-10-01 2012-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...

  17. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 4 2011-10-01 2011-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...

  18. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 4 2013-10-01 2013-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...

  19. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 4 2014-10-01 2014-10-01 false Interim hybrid IBOC DAB operation. 73.404 Section 73.404 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) BROADCAST RADIO SERVICES RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The...

  20. 10 CFR 590.403 - Emergency interim orders.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... DEPARTMENT OF ENERGY (CONTINUED) NATURAL GAS (ECONOMIC REGULATORY ADMINISTRATION) ADMINISTRATIVE PROCEDURES WITH RESPECT TO THE IMPORT AND EXPORT OF NATURAL GAS Opinions and Orders § 590.403 Emergency interim... and issue an emergency interim order authorizing the import or export of natural gas. After issuance...

  1. EPA Interim Evaluation of 2016-2017 Milestone Progress in the Chesapeake Bay Watershed

    EPA Pesticide Factsheets

    This page provides the EPA interim evaluations of the 2016-2017 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2016-2017 milestones, recognizing the achievements made in 2016.

  2. EPA Interim Evaluation of 2012-2013 Milestone Progress in the Chesapeake Bay Watershed

    EPA Pesticide Factsheets

    This page provides the EPA interim evaluations of the 2012-2013 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2012-2013 milestones, recognizing the achievements made in 2012.

  3. 49 CFR 37.193 - Interim service requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Interim service requirements. 37.193 Section 37.193 Transportation Office of the Secretary of Transportation TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Over-the-Road Buses (OTRBs) § 37.193 Interim service requirements. (a) Until...

  4. 76 FR 57657 - Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ...] Tetrachlorvinphos; Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: This regulation establishes an extension of time-limited interim..., and Cosmetic Act (FFDCA). The time-limited tolerances expire on March 18, 2013. DATES: This regulation...

  5. EPA Interim Evaluation of 2014-2015 Milestone Progress in the Chesapeake Bay Watershed

    EPA Pesticide Factsheets

    This page provides the EPA interim evaluations of the 2014-2015 milestones for the Chesapeake Bay TMDL. These interim assessments provide a mid-point check on the progress made on the 2014-2015 milestones, recognizing the achievements made in 2014.

  6. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 4 2013-10-01 2013-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  7. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 4 2012-10-01 2012-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  8. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 4 2011-10-01 2011-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  9. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 4 2014-10-01 2014-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  10. 45 CFR 1623.6 - Interim funding.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Interim funding. 1623.6 Section 1623.6 Public Welfare Regulations Relating to Public Welfare (Continued) LEGAL SERVICES CORPORATION SUSPENSION PROCEDURES § 1623.6 Interim funding. (a) Pending the completion of suspension proceedings under this part...

  11. An interim prosthesis program for lower limb amputees: comparison of public and private models of service.

    PubMed

    Gordon, Robert; Magee, Christopher; Frazer, Anna; Evans, Craig; McCosker, Kathryn

    2010-06-01

    This study compared the outcomes of an interim mechanical prosthesis program for lower limb amputees operated under a public and private model of service. Over a two-year period, 60 transtibial amputees were fitted with an interim prosthesis as part of their early amputee care. Thirty-four patients received early amputee care under a public model of service, whereby a prosthetist was employed to provide the interim mechanical prosthesis service. The remaining 26 patients received early amputee care under a private model of service, where an external company was contracted to provide the interim mechanical prosthesis service. The results suggested comparable clinical outcomes between the two patient groups. However, the public model appeared to be less expensive with the average labour cost per patient being 29.0% lower compared with the private model. The results suggest that a public model of service may provide a more comprehensive and less expensive interim prosthesis program for lower limb amputees.

  12. 46 CFR 32.05-1 - Draft marks and draft indicating systems-TB/ALL.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 1 2014-10-01 2014-10-01 false Draft marks and draft indicating systems-TB/ALL. 32.05-1..., MACHINERY, AND HULL REQUIREMENTS Markings § 32.05-1 Draft marks and draft indicating systems—TB/ALL. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...

  13. 46 CFR 32.05-1 - Draft marks and draft indicating systems-TB/ALL.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 1 2011-10-01 2011-10-01 false Draft marks and draft indicating systems-TB/ALL. 32.05-1..., MACHINERY, AND HULL REQUIREMENTS Markings § 32.05-1 Draft marks and draft indicating systems—TB/ALL. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...

  14. 46 CFR 32.05-1 - Draft marks and draft indicating systems-TB/ALL.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Draft marks and draft indicating systems-TB/ALL. 32.05-1..., MACHINERY, AND HULL REQUIREMENTS Markings § 32.05-1 Draft marks and draft indicating systems—TB/ALL. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...

  15. 46 CFR 32.05-1 - Draft marks and draft indicating systems-TB/ALL.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 1 2013-10-01 2013-10-01 false Draft marks and draft indicating systems-TB/ALL. 32.05-1..., MACHINERY, AND HULL REQUIREMENTS Markings § 32.05-1 Draft marks and draft indicating systems—TB/ALL. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...

  16. 46 CFR 32.05-1 - Draft marks and draft indicating systems-TB/ALL.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 1 2012-10-01 2012-10-01 false Draft marks and draft indicating systems-TB/ALL. 32.05-1..., MACHINERY, AND HULL REQUIREMENTS Markings § 32.05-1 Draft marks and draft indicating systems—TB/ALL. (a) All vessels must have draft marks plainly and legibly visible upon the stem and upon the sternpost or...

  17. 78 FR 14487 - Tetrachlorvinphos; Proposed Extension of Time-Limited Interim Pesticide Tolerances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-06

    ...] Tetrachlorvinphos; Proposed Extension of Time-Limited Interim Pesticide Tolerances AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: This regulation proposes the extension of the time-limited... related to EPA's extension of the time-limited interim tolerances for the combined residues of the...

  18. 24 CFR 115.207 - Consequences of interim certification and certification.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Consequences of interim certification and certification. 115.207 Section 115.207 Housing and Urban Development Regulations Relating to... ENFORCEMENT AGENCIES Certification of Substantially Equivalent Agencies § 115.207 Consequences of interim...

  19. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 8 2014-10-01 2014-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  20. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 8 2013-10-01 2013-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  1. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 8 2011-10-01 2011-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  2. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 8 2010-10-01 2010-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  3. 46 CFR 308.203 - Amount insured under interim binder.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 8 2012-10-01 2012-10-01 false Amount insured under interim binder. 308.203 Section 308.203 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Protection and Indemnity Insurance § 308.203 Amount insured under interim binder. The...

  4. 76 FR 74834 - Interim Staff Guidance on Aging Management Program for Steam Generators

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... NRC staff's evaluation of the suitability of using Revision 3 of the Nuclear Energy Institute's (NEI... NUCLEAR REGULATORY COMMISSION [NRC-2011-0228] Interim Staff Guidance on Aging Management Program for Steam Generators AGENCY: Nuclear Regulatory Commission. ACTION: Interim staff guidance; issuance...

  5. 78 FR 20503 - Energy Conservation Program: Availability of the Interim Technical Support Document for High...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-05

    ... Conservation Program: Availability of the Interim Technical Support Document for High-Intensity Discharge Lamps... high-intensity discharge (HID) lamps energy conservation standards in the Federal Register. This... interim analysis for high- intensity discharge lamps energy conservation standards. The notice provided...

  6. A randomized adaptive phase II/III study of buparlisib, a pan-class I PI3K inhibitor, combined with paclitaxel for the treatment of HER2- advanced breast cancer (BELLE-4).

    PubMed

    Martín, M; Chan, A; Dirix, L; O'Shaughnessy, J; Hegg, R; Manikhas, A; Shtivelband, M; Krivorotko, P; Batista López, N; Campone, M; Ruiz Borrego, M; Khan, Q J; Beck, J T; Ramos Vázquez, M; Urban, P; Goteti, S; Di Tomaso, E; Massacesi, C; Delaloge, S

    2017-02-01

    Phosphatidylinositol 3-kinase (PI3K) pathway activation in preclinical models of breast cancer is associated with tumor growth and resistance to anticancer therapies, including paclitaxel. Effects of the pan-Class I PI3K inhibitor buparlisib (BKM120) appear synergistic with paclitaxel in preclinical and clinical models. BELLE-4 was a 1:1 randomized, double-blind, placebo-controlled, adaptive phase II/III study investigating the combination of buparlisib or placebo with paclitaxel in women with human epidermal growth factor receptor 2-negative locally advanced or metastatic breast cancer with no prior chemotherapy for advanced disease. Patients were stratified by PI3K pathway activation and hormone receptor status. The primary endpoint was progression-free survival (PFS) in the full and PI3K pathway-activated populations. An adaptive interim analysis was planned following the phase II part of the study, after ≥125 PFS events had occurred in the full population, to decide whether the study would enter phase III (in the full or PI3K pathway-activated population) or be stopped for futility. As of August 2014, 416 patients were randomized to receive buparlisib (207) or placebo (209) with paclitaxel. At adaptive interim analysis, there was no improvement in PFS with buparlisib versus placebo in the full (median PFS 8.0 versus 9.2 months, hazard ratio [HR] 1.18), or PI3K pathway-activated population (median PFS 9.1 versus 9.2 months, HR 1.17). The study met protocol-specified criteria for futility in both populations, and phase III was not initiated. Median duration of study treatment exposure was 3.5 months in the buparlisib arm versus 4.6 months in the placebo arm. The most frequent adverse events with buparlisib plus paclitaxel (≥40% of patients) were diarrhea, alopecia, rash, nausea, and hyperglycemia. Addition of buparlisib to paclitaxel did not improve PFS in the full or PI3K pathway-activated study population. Consequently, the trial was stopped for futility at the end of phase II. © The Author 2016. Published by Oxford University Press on behalf of the European Society for Medical Oncology. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  7. Drafting Fundamentals. Drafting Module 1. Instructor's Guide.

    ERIC Educational Resources Information Center

    Missouri Univ., Columbia. Instructional Materials Lab.

    This Missouri Vocational Instruction Management System instructor's drafting guide has been keyed to the drafting competency profile developed by state industry and education professionals. The guide contains a cross-reference table of instructional materials. Ten units cover drafting fundamentals: (1) introduction to drafting; (2) general safety;…

  8. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 3 2012-07-01 2012-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  9. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 3 2014-07-01 2014-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  10. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  11. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 3 2013-07-01 2013-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  12. 30 CFR 827.13 - Coal preparation plants: Interim performance standards.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Coal preparation plants: Interim performance...-COAL PREPARATION PLANTS NOT LOCATED WITHIN THE PERMIT AREA OF A MINE § 827.13 Coal preparation plants: Interim performance standards. (a) Persons operating or who have operated coal preparation plants after...

  13. 75 FR 13484 - Foreign-Trade Zone 22; Temporary/Interim Manufacturing Authority; LG Electronics Mobilecomm USA...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-22

    ... DEPARTMENT OF COMMERCE [Docket T-1-2010] Foreign-Trade Zones Board Foreign-Trade Zone 22; Temporary/Interim Manufacturing Authority; LG Electronics Mobilecomm USA, Inc. (Cell Phones); Notice of.../ interim manufacturing (T/IM) authority, on behalf of LG Electronics Mobilecomm USA, Inc. (LGEMU), to...

  14. 76 FR 37781 - Foreign-Trade Zone 26; Atlanta, GA; Application for Temporary/Interim Manufacturing Authority...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-28

    ..., GA; Application for Temporary/ Interim Manufacturing Authority; Makita Corporation of America; (Hand- Held Power Tool and Gasoline/Electric-Powered Garden Product Manufacturing); Buford, GA An application... Georgia Foreign-Trade Zone, Inc., grantee of FTZ 26, requesting temporary/interim manufacturing (T/IM...

  15. Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bradley, J.

    2002-06-18

    The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process.

  16. The Intentional Interim

    ERIC Educational Resources Information Center

    Nugent, Patricia A.

    2011-01-01

    The author spent years in central-office administration, most recently in an interim position. Some interim administrators simply see themselves as placeholders until the real deal is hired, giving the organization the opportunity to coast. There are others who see themselves as change agents and cannot wait to undo or redo what their predecessor…

  17. Presidential Transition: The Experience of Two Community College Interim Presidents

    ERIC Educational Resources Information Center

    Thompson, Matthew D.

    2010-01-01

    The purpose of this qualitative case study was to understand the experiences of two community college interim presidents, their characteristics, and how they led institutions following an abrupt presidential departure. There were two fundamental questions framing this research study, 1. How do two interim community college presidents lead…

  18. 47 CFR 73.404 - Interim hybrid IBOC DAB operation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... RADIO BROADCAST SERVICES Digital Audio Broadcasting § 73.404 Interim hybrid IBOC DAB operation. (a) The... test operation pursuant to § 73.1620, may commence interim hybrid IBOC DAB operation with digital... No. 99-325. FM stations are permitted to operate with hybrid digital effective radiated power equal...

  19. 17 CFR 210.10-01 - Interim financial statements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... accountant on the review must be filed with the interim financial statements. (e) Filing of other interim... sheets shall include only major captions (i.e., numbered captions) prescribed by the applicable sections... the date of any material accounting change and the reasons for making it. In addition, for filings on...

  20. 77 FR 55232 - Japan Lessons-Learned Project Directorate Interim Staff Guidance JLD-ISG-2012-03; Compliance With...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0067] Japan Lessons-Learned Project Directorate Interim...-Learned Project Directorate Interim Staff Guidance; issuance. SUMMARY: The U.S. Nuclear Regulatory Commission (NRC or the Commission) is issuing the Final Japan Lessons-Learned Project Directorate (JLD...

  1. 75 FR 66553 - Truth in Lending

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-28

    ... AGENCY: Board of Governors of the Federal Reserve System. ACTION: Interim final rule; request for public comment. SUMMARY: The Board is publishing for public comment an interim final rule amending Regulation Z (Truth in Lending). The interim rule implements Section 129E of the Truth in Lending Act (TILA), which...

  2. Staff Reactions to Interim Leadership in a Student Affairs Organization

    ERIC Educational Resources Information Center

    Jones, Robin D.

    2011-01-01

    Interim leadership appointments in higher education are a common strategy used to fill leadership gaps in executive positions. Because student affairs executives are particularly vulnerable to high turnover rates, interim appointments are becoming more widespread. Even with the prevalence of this trend, little attention has been given to the…

  3. Faculty and Student Views of the Interim Term

    ERIC Educational Resources Information Center

    Centra, John A.; Sobol, Marion G.

    1974-01-01

    Evaluations of the interim term or 4-1-4 program at various colleges have been generally favorable. A detailed evaluation of the Rider College interim study program based on faculty and student reports indicated that the more nontraditionally oriented courses were rated higher than the more traditional offerings. (Editor/PG)

  4. 12 CFR 541.18 - Interim Federal savings association.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... an existing savings and loan holding company or to facilitate any other transaction the Office may... 12 Banks and Banking 5 2010-01-01 2010-01-01 false Interim Federal savings association. 541.18... REGULATIONS AFFECTING FEDERAL SAVINGS ASSOCIATIONS § 541.18 Interim Federal savings association. The term...

  5. 15 CFR 904.322 - Interim action.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 3 2010-01-01 2010-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine resources during the pendency of an action under this subpart, in cases of willfulness, or as otherwise...

  6. 15 CFR 904.322 - Interim action.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 3 2011-01-01 2011-01-01 false Interim action. 904.322 Section 904... Sanctions and Denials Permit Sanction for Violations § 904.322 Interim action. (a) To protect marine resources during the pendency of an action under this subpart, in cases of willfulness, or as otherwise...

  7. Into the Sunset: Reflections of an Interim Administrator.

    ERIC Educational Resources Information Center

    Marlowe, John

    2000-01-01

    One advantage to an interim administrative position is that the public cuts short-timers a little slack. Temporary administrators can learn on the job and become experts on specialized subjects. Personnel issues demand more time than interims possess. Such positions usually do not turn into long-term contracts. (MLH)

  8. PCoD Lite - Using an Interim PCoD Protocol to Assess the Effects of Disturbance Associated with US Navy Exercises on Marine Mammal Populations

    DTIC Science & Technology

    2015-09-30

    1 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. PCoD Lite - Using an Interim PCoD Protocol to Assess...US National Research Council (NRC 2005). Here, we provide an insight into how the Interim PCoD approach (Harwood et al. 2014, King et al. 2015...illustrate how the interim PCoD protocol can be used to inform the process of determining whether or not Navy activities are likely to have an impact on

  9. Functional Drafting, Drafting--Intermediate: 9255.02.

    ERIC Educational Resources Information Center

    Dade County Public Schools, Miami, FL.

    The course consists of six instructional blocks totaling 135 clock hours: (1) functional drafting, (2) threads and fasteners, (3) pictorial drawings, (4) introduction to electronic drafting, (5) introduction to piping drafting, and (6) Quinmester posttest. Mastery of skills indicated in Drafting-Basic--9255.01 is a prerequisite. In the functional…

  10. 76 FR 41808 - Draft Environmental Impact Statement and Draft Habitat Conservation Plan for Oncor Electric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ...] Draft Environmental Impact Statement and Draft Habitat Conservation Plan for Oncor Electric Delivery..., announce the availability of the draft environmental impact statement and the draft Oncor Electric Delivery... Oncor Electric Delivery Company, LLC (Applicant; Oncor), and (2) That the Applicant has developed a...

  11. On the Linear Stability of Two-Dimensional Barium Clouds. I. The Inviscid Case.

    DTIC Science & Technology

    1984-04-30

    MECVRDT FKPR--7;PG ON13& TYPE OF REPORT 13R1. TIME 8 CIEDO 1 4 AT OF REOT .Y,. Mo.. Day, 37PAECON Interim FROM 10183 TO17’I April 30, 1984 I37 IS...Note that if we write our perturbation ( 8 ) in terms of arc length ro 0 multiplied by a wavenumber k then cos m6 - cos k r0 and m/ro - k (10) 4 ...38 APR 84 NRL-MR-53i2 UNCLASSIFIED F/G 4 /1 NI I EEEEEEEEE L &, 12 am... ~ a m II) ,uut_ _- 7-_ MICROCOPY RESOLUTION TEST CHART NATIONAL BUREAU OF

  12. Oral Historical, Documentary, and Archaeological Investigations of Barton and Vinton, Mississippi: An Interim Report on Phase II of the Tombigbee Historic Townsites Project.

    DTIC Science & Technology

    1983-05-01

    Nirwerly Contribu~tions 6b- Leah Allen 11. itcpAk;i McBr&-de W. Lei Nfilijfl, Miltun B. Newtoni Rohcrl C.. Sonder-lari W n ;, Va , 3 r . .Ai𔃾 tht...the Tombigbee Historic Townmsites Project -____ 7. Am1A I\\ akwon O"Uef"Z5SE6 now. 146. W. Lee Minnerly, et.aI. r pooemsag GCeavlIO ftevne .. .^"#va.C P...13 ’ Results . . . . . . . . . . . . . . . . . . . .. . 115 I I r w . -w~~~~7 - .1 -. 1 u- - - - - - Site and Unit Descriptions

  13. Characterization of Atmospheric Aerosol Behavior and Climatic Effects by Analysis of SAGE 2 and Other Space, Air, and Ground Measurements

    NASA Technical Reports Server (NTRS)

    Livingston, John M.

    1999-01-01

    This report documents the research performed under NASA Ames Cooperative Agreement NCC 2-991, which covered the period 1 April 1997 through 31 March 1999. Previously, an interim technical report (Technical Report No. 1, 20 March 1998) summarized the work completed during the period 1 April 1997 through 31 March 1998. The objective of the proposed research was to advance our understanding of atmospheric aerosol behavior, aerosol-induced climatic effects, and the remote measurement and retrieval capabilities of spaceborne sensors such as SAGE II by combining and comparing data from these instruments and from airborne and ground-based instruments.

  14. A Computer Model of Drafting Effects on Collective Behavior in Elite 10,000-m Runners.

    PubMed

    Trenchard, Hugh; Renfree, Andrew; Peters, Derek M

    2017-03-01

    Drafting in cycling influences collective behavior of pelotons. Although evidence for collective behavior in competitive running events exists, it is not clear if this results from energetic savings conferred by drafting. This study modeled the effects of drafting on behavior in elite 10,000-m runners. Using performance data from a men's elite 10,000-m track running event, computer simulations were constructed using Netlogo 5.1 to test the effects of 3 different drafting quantities on collective behavior: no drafting, drafting to 3 m behind with up to ~8% energy savings (a realistic running draft), and drafting up to 3 m behind with up to 38% energy savings (a realistic cycling draft). Three measures of collective behavior were analyzed in each condition: mean speed, mean group stretch (distance between first- and last-placed runner), and runner-convergence ratio (RCR), which represents the degree of drafting benefit obtained by the follower in a pair of coupled runners. Mean speeds were 6.32 ± 0.28, 5.57 ± 0.18, and 5.51 ± 0.13 m/s in the cycling-draft, runner-draft, and no-draft conditions, respectively (all P < .001). RCR was lower in the cycling-draft condition but did not differ between the other 2. Mean stretch did not differ between conditions. Collective behaviors observed in running events cannot be fully explained through energetic savings conferred by realistic drafting benefits. They may therefore result from other, possibly psychological, processes. The benefits or otherwise of engaging in such behavior are as yet unclear.

  15. 46 CFR 131.220 - Drafts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Drafts. 131.220 Section 131.220 Shipping COAST GUARD... Drafts. (a) Each vessel must have the drafts of the vessel plainly and legibly marked upon the stem and... easy observance. The bottom of each mark must indicate the draft. (b) Each draft must be taken from the...

  16. 46 CFR 131.220 - Drafts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Drafts. 131.220 Section 131.220 Shipping COAST GUARD... Drafts. (a) Each vessel must have the drafts of the vessel plainly and legibly marked upon the stem and... easy observance. The bottom of each mark must indicate the draft. (b) Each draft must be taken from the...

  17. 33 CFR 401.29 - Maximum draft.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Maximum draft. 401.29 Section 401... TRANSPORTATION SEAWAY REGULATIONS AND RULES Regulations Seaway Navigation § 401.29 Maximum draft. (a) The draft...) The draft of a vessel shall not, in any case, exceed 79.2 dm or the maximum permissible draft...

  18. 46 CFR 131.220 - Drafts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Drafts. 131.220 Section 131.220 Shipping COAST GUARD... Drafts. (a) Each vessel must have the drafts of the vessel plainly and legibly marked upon the stem and... easy observance. The bottom of each mark must indicate the draft. (b) Each draft must be taken from the...

  19. 46 CFR 131.220 - Drafts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Drafts. 131.220 Section 131.220 Shipping COAST GUARD... Drafts. (a) Each vessel must have the drafts of the vessel plainly and legibly marked upon the stem and... easy observance. The bottom of each mark must indicate the draft. (b) Each draft must be taken from the...

  20. 33 CFR 401.29 - Maximum draft.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Maximum draft. 401.29 Section 401... TRANSPORTATION SEAWAY REGULATIONS AND RULES Regulations Seaway Navigation § 401.29 Maximum draft. (a) The draft...) The draft of a vessel shall not, in any case, exceed 79.2 dm or the maximum permissible draft...

  1. 46 CFR 131.220 - Drafts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Drafts. 131.220 Section 131.220 Shipping COAST GUARD... Drafts. (a) Each vessel must have the drafts of the vessel plainly and legibly marked upon the stem and... easy observance. The bottom of each mark must indicate the draft. (b) Each draft must be taken from the...

  2. 76 FR 57760 - Notice of Availability of Draft Resource Management Plan and Draft Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... Availability of Draft Resource Management Plan and Draft Environmental Impact Statement for the Colorado River... prepared a Draft Resource Management Plan (RMP) and Draft Environmental Impact Statement (EIS) for the... alternative) seeks to allocate limited resources among competing human interests, land uses, and conservation...

  3. 33 CFR 401.29 - Maximum draft.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Maximum draft. 401.29 Section 401... TRANSPORTATION SEAWAY REGULATIONS AND RULES Regulations Seaway Navigation § 401.29 Maximum draft. (a) The draft...) The draft of a vessel shall not, in any case, exceed 79.2 dm or the maximum permissible draft...

  4. 76 FR 59732 - Draft Environmental Impact Statement and Draft Habitat Conservation Plan for Oncor Electric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-27

    ...] Draft Environmental Impact Statement and Draft Habitat Conservation Plan for Oncor Electric Delivery... availability of the draft environmental impact statement (DEIS) and the draft Oncor Electric Delivery Company... announced that Oncor Electric Delivery Company, LLC, has applied under section 10(a)(1)(B) of the Endangered...

  5. 75 FR 7591 - Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-22

    ... ENVIRONMENTAL PROTECTION AGENCY [EPA-HQ-SFUND-2009-0907; FRL-9114-6] RIN 2050-ZA05 Guidance on Recommended Interim Preliminary Remediation Goals for Dioxin in Soil at CERCLA and RCRA Sites; Extension of... Interim Preliminary Remediation Goals for Dioxin in Soil at Comprehensive Environmental Response...

  6. Do Interim Assessments Reduce the Race and SES Achievement Gaps?

    ERIC Educational Resources Information Center

    Konstantopoulos, Spyros; Li, Wei; Miller, Shazia R.; van der Ploeg, Arie

    2017-01-01

    The authors examined differential effects of interim assessments on minority and low socioeconomic status students' achievement in Grades K-6. They conducted a large-scale cluster randomized experiment in 2009-2010 to evaluate the impact of Indiana's policy initiative introducing interim assessments statewide. The authors used 2-level models to…

  7. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance: Treasury 1 2013-07-01 2013-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  8. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 31 Money and Finance: Treasury 1 2014-07-01 2014-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  9. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance: Treasury 1 2012-07-01 2012-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  10. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  11. 75 FR 54526 - Defense Federal Acquisition Regulation Supplement; Payment of Costs Prior to Definitization...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-08

    ... in 48 CFR Part 217 Government procurement. Ynette R. Shelkin, Editor, Defense Acquisition Regulations...). ACTION: Final rule. SUMMARY: DoD is adopting as final, without change, an interim rule amending the... interim rule. Therefore, DoD is finalizing the interim rule without change. This rule was not subject to...

  12. 76 FR 43260 - Foreign-Trade Zone 72-Indianapolis, IN; Application for Temporary/Interim Manufacturing Authority...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ...--Indianapolis, IN; Application for Temporary/Interim Manufacturing Authority; Brevini Wind USA, Inc. (Wind... temporary/interim manufacturing (T/IM) authority within FTZ 72 at the Brevini Wind USA, Inc. (Brevini... requested authority to produce wind turbine gear boxes (HTSUS 8483.40, duty rate: 2.5%). Foreign components...

  13. 75 FR 60436 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-30

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it is releasing an interim...

  14. 75 FR 24667 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it released an interim change...

  15. 75 FR 10476 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-08

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it released an interim change...

  16. 76 FR 776 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-06

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it is releasing an interim...

  17. 75 FR 15420 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) NO. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it will release an interim...

  18. 76 FR 59119 - Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-23

    ... DEPARTMENT OF DEFENSE Department of the Army Interim Change to the Military Freight Traffic Unified Rules Publication (MFTURP) No. 1 AGENCY: Department of the Army, DoD. SUMMARY: The Military Surface Deployment and Distribution Command (SDDC) is providing notice that it has released an interim...

  19. Can Interim Assessments Be Used for Instructional Change? Policy Brief. RB-51

    ERIC Educational Resources Information Center

    Goertz, Margaret E.; Olah, Leslie Nabors; Riggan, Matthew

    2009-01-01

    The purpose of this exploratory study was to examine the use of interim assessments and the policy supports that promote their use to change instruction, focusing on elementary school mathematics. The authors use the term "interim assessments" to refer to assessments that: a) evaluate student knowledge and skills, typically within a…

  20. 40 CFR Appendix III to Part 265 - EPA Interim Primary Drinking Water Standards

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... 40 Protection of Environment 26 2011-07-01 2011-07-01 false EPA Interim Primary Drinking Water... Water Standards Parameter Maximum level (mg/l) Arsenic 0.05 Barium 1.0 Cadmium 0.01 Chromium 0.05...

  1. 40 CFR Appendix III to Part 265 - EPA Interim Primary Drinking Water Standards

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT... 40 Protection of Environment 25 2010-07-01 2010-07-01 false EPA Interim Primary Drinking Water... Water Standards Parameter Maximum level (mg/l) Arsenic 0.05 Barium 1.0 Cadmium 0.01 Chromium 0.05...

  2. 33 CFR 96.360 - Interim Safety Management Certificate: what is it and when can it be used?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... section, when— (1) The company's valid Document of Compliance certificate or Interim Document of Compliance certificate applies to that vessel type; (2) The company's safety management system for the vessel... to the responsible person or their company. (b) An Interim Safety Management Certificate is valid for...

  3. 76 FR 15028 - Airport Improvement Program (AIP): Interim Policy Regarding Access to Airports From Residential...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-18

    ... resolution. The goal of the interim policy is to strike a careful balance by accommodating residential... will allow the agency to complete a separate, ongoing general aviation airport study that is analyzing the federally assisted general aviation airport system. The interim policy adopts the changes proposed...

  4. 42 CFR 417.572 - Budget and enrollment forecast and interim reports.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 3 2010-10-01 2010-10-01 false Budget and enrollment forecast and interim reports... PLANS, AND HEALTH CARE PREPAYMENT PLANS Medicare Payment: Cost Basis § 417.572 Budget and enrollment forecast and interim reports. (a) Annual submittal. The HMO or CMP must submit an annual operating budget...

  5. 40 CFR Appendix III to Part 265 - EPA Interim Primary Drinking Water Standards

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 26 2014-07-01 2014-07-01 false EPA Interim Primary Drinking Water Standards III Appendix III to Part 265 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) INTERIM STATUS STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Pt....

  6. 75 FR 65528 - Membership of the National Science Board's Senior Executive Service Performance Review Board

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-25

    ...: Comments should be addressed to Interim Director, Division of Human Resource Management and Chief Human.... Judith S. Sunley, Interim Director, Division of Human Resource Management and Chief Human Capital Officer..., Interim Director, Division of Human Resource Management and Chief Human Capital Officer. [FR Doc. 2010...

  7. 46 CFR 308.6 - Period of interim binders, updating application information and new applications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...

  8. 46 CFR 308.6 - Period of interim binders, updating application information and new applications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...

  9. 46 CFR 308.6 - Period of interim binders, updating application information and new applications.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...

  10. 46 CFR 308.6 - Period of interim binders, updating application information and new applications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... information and new applications. 308.6 Section 308.6 Shipping MARITIME ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE General § 308.6 Period of interim binders, updating... interim binders are required to notify the American War Risk Agency annually, by June 30th, of any change...

  11. 77 FR 15818 - License Renewal Interim Staff Guidance LR-ISG-2011-05: Ongoing Review of Operating Experience

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-16

    ...-05: Ongoing Review of Operating Experience AGENCY: Nuclear Regulatory Commission. ACTION: Interim... License Renewal Interim Staff Guidance (LR-ISG), LR-ISG-2011-05, ``Ongoing Review of Operating Experience... industry-wide operating experience as an attribute of aging management programs used at nuclear power...

  12. 31 CFR 50.7 - Special Rules for Interim Guidance Safe Harbors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Special Rules for Interim Guidance Safe Harbors. 50.7 Section 50.7 Money and Finance: Treasury Office of the Secretary of the Treasury TERRORISM RISK INSURANCE PROGRAM General Provisions § 50.7 Special Rules for Interim Guidance Safe Harbors...

  13. A Conservative Method of Retaining an Interim Obturator for a Total Maxillectomy Patient

    PubMed Central

    Bettie, Nirmal Famila

    2017-01-01

    Interim obturators are indicated during the postsurgical phases. It promotes surgical healing and serves as a temporary prosthesis to rehabilitate a patient with intra-oral surgical defect. Retention is gained by wiring, surgical suturing, and other noninvasive methods to enable functional rehabilitation and easy replacement with a permanent obturator. Interim obturators serve as an easy guide for replacing with definitive obturators by indicating prosthesis extensions and the required method of retention. A more conservative and noninvasive method of retaining an interim obturator for a maxillectomy patient is described in this case report. PMID:29284985

  14. A Conservative Method of Retaining an Interim Obturator for a Total Maxillectomy Patient.

    PubMed

    Bettie, Nirmal Famila

    2017-11-01

    Interim obturators are indicated during the postsurgical phases. It promotes surgical healing and serves as a temporary prosthesis to rehabilitate a patient with intra-oral surgical defect. Retention is gained by wiring, surgical suturing, and other noninvasive methods to enable functional rehabilitation and easy replacement with a permanent obturator. Interim obturators serve as an easy guide for replacing with definitive obturators by indicating prosthesis extensions and the required method of retention. A more conservative and noninvasive method of retaining an interim obturator for a maxillectomy patient is described in this case report.

  15. Automatic draft reading based on image processing

    NASA Astrophysics Data System (ADS)

    Tsujii, Takahiro; Yoshida, Hiromi; Iiguni, Youji

    2016-10-01

    In marine transportation, a draft survey is a means to determine the quantity of bulk cargo. Automatic draft reading based on computer image processing has been proposed. However, the conventional draft mark segmentation may fail when the video sequence has many other regions than draft marks and a hull, and the estimated waterline is inherently higher than the true one. To solve these problems, we propose an automatic draft reading method that uses morphological operations to detect draft marks and estimate the waterline for every frame with Canny edge detection and a robust estimation. Moreover, we emulate surveyors' draft reading process for getting the understanding of a shipper and a receiver. In an experiment in a towing tank, the draft reading error of the proposed method was <1 cm, showing the advantage of the proposed method. It is also shown that accurate draft reading has been achieved in a real-world scene.

  16. Drafting: Current Trends and Future Practices

    ERIC Educational Resources Information Center

    Jensen, C.

    1976-01-01

    Various research findings are reported on drafting trends which the author feels should be incorporated into teaching drafting: (1) true position and geometric tolerancing, (2) decimal and metric dimensioning, (3) functional drafting, (4) automated drafting, and (5) drawing reproductions. (BP)

  17. Mississippi Curriculum Framework for Drafting and Design Technology (Program CIP: 48.0102--Architectural Drafting Technology) (Program CIP: 48.0101--General Drafting). Postsecondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which is intended for use by community and junior colleges throughout Mississippi, contains curriculum frameworks for the two course sequences of the state's postsecondary-level drafting and design technology program: architectural drafting technology and drafting and design technology. Presented first are a program description and…

  18. 50 CFR 660.720 - Interim protection for sea turtles.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 50 Wildlife and Fisheries 13 2012-10-01 2012-10-01 false Interim protection for sea turtles. 660... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§ 660.707... harvest of swordfish (Xiphias gladius) using longline gear deployed on the high seas of the Pacific Ocean...

  19. 50 CFR 660.720 - Interim protection for sea turtles.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 50 Wildlife and Fisheries 13 2013-10-01 2013-10-01 false Interim protection for sea turtles. 660... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§ 660.707... harvest of swordfish (Xiphias gladius) using longline gear deployed on the high seas of the Pacific Ocean...

  20. 50 CFR 660.720 - Interim protection for sea turtles.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 50 Wildlife and Fisheries 11 2011-10-01 2011-10-01 false Interim protection for sea turtles. 660... Migratory Fisheries § 660.720 Interim protection for sea turtles. (a) Until the effective date of §§ 660.707... harvest of swordfish (Xiphias gladius) using longline gear deployed on the high seas of the Pacific Ocean...

Top