Sample records for iii program planning

  1. 40 CFR Appendix A to Subpart III... - States With Approved State Implementation Plan Revisions Concerning CAIR SO2 Opt-In Units

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Implementation Plan Revisions Concerning CAIR SO2 Opt-In Units A Appendix A to Subpart III of Part 97 Protection... BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS CAIR SO2 Opt-in Units Pt. 97, Subpt. III... Concerning CAIR SO2 Opt-In Units 1. The following States have State Implementation Plan revisions under § 51...

  2. Detailed technical plan for Test Program Element-III (TPE-III) of the first wall/blanket shield engineering test program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Turner, L.R.; Praeg, W.F.

    1982-03-01

    The experimental requirements, test-bed design, and computational requirements are reviewed and updated. Next, in Sections 3, 4 and 5, the experimental plan, instrumentation, and computer plan, respectively, are described. Finally, Section 6 treats other considerations, such as personnel, outside participation, and distribution of results.

  3. Louisiana SIP: LAC 33:III Ch. 14 Subchap B, 1431 to 1434--Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and Projects Developed, Funded, or Approved Under Title 23 U.S.C. or the Federal Transit Laws

    EPA Pesticide Factsheets

    Louisiana SIP: LAC 33:III Ch. 14 Subchap B, 1431 to 1434--Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and Projects Developed, Funded, or Approved Under Title 23 U.S.C. or the Federal Transit Laws

  4. 20 CFR 631.19 - Appeals.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... training plans or modifications) shall apply to final disapproval of substate plans under § 631.50(f) of...' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR PROGRAMS UNDER TITLE III OF THE JOB TRAINING PARTNERSHIP ACT Additional Title III Administrative Standards and Procedures § 631.19 Appeals...

  5. MIS/TIS/IR Seven-Year, Long-Range Plan: Developed to Substantiate a Request for Title III SDIP Funds.

    ERIC Educational Resources Information Center

    Olagunju, Amos O.

    A seven-year master plan for Barber-Scotia College, which was needed to substantiate requests for federal grants for Strengthening Developing Institutions (SDIP) under the Title III program, is described. An outline for developing a long-range plan is also presented that features: college role, admission policies, enrollment, student recruitment,…

  6. 75 FR 70654 - Approval and Promulgation of Air Quality Implementation Plans; Texas; System Cap Trading Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-18

    ... Promulgation of Air Quality Implementation Plans; Texas; System Cap Trading Program AGENCY: Environmental..., 2001, and August 16, 2007, that create and amend the System Cap Trading (SCT) Program at Title 30 of.... What action is EPA proposing? II. What did Texas submit? III. What is the System Cap Trading Program...

  7. New York State Title III NDEA Planning Guide. Revised Edition, 1967-68.

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany.

    This document provides guidelines for public school authorities who wish to avail themselves of the opportunities provided by the Title III NDEA programs. The document outlines participation in the program in terms of--(1) application procedures, (2) reimbursement procedures, (3) special projects, (4) priority considerations, (5) basic standards…

  8. Mississippi Curriculum Framework for Marketing and Fashion Merchandising (Program CIP: 08.0705--General Retailing Operations). Secondary Programs.

    ERIC Educational Resources Information Center

    Mississippi Research and Curriculum Unit for Vocational and Technical Education, State College.

    This document, which reflects Mississippi's statutory requirement that instructional programs be based on core curricula and performance-based assessment, contains outlines of the instructional units required in local instructional management plans and daily lesson plans for marketing I-II and fashion merchandising. Presented first are a program…

  9. 42 CFR 430.12 - Submittal of State plans and plan amendments.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... periodic reports on the Medicaid program, excluding periodic statistical, budget and fiscal reports. (iii... the Medicaid program. For changes related to advance directive requirements, amendments must be... concerning advance directives. (2) Prompt submittal of amendments is necessary— (i) So that CMS can determine...

  10. 77 FR 27417 - Sunshine Act Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-10

    ... Agenda II. Approval of the March 9, 2012 Meeting Minutes III. Program Planning Update and discussion of projects: Strategic Planning Process Discussion on 2013 Statutory Report Selection Process IV. Management...

  11. Analysis and Evaluation of 137 ESEA Title III Planning and Operational Grants. Report No. 4 of the Second National Study of PACE.

    ERIC Educational Resources Information Center

    Fairfax County Schools, Baileys Crossroads, VA. Center for Effecting Educational Change.

    This report is an assessment of the overall impact and influence on education of 137 terminated Planning and Operational Grants made under the ESEA Title III Projects to Advance Creativity in Education (PACE) program. Analysis and evaluation seek to determine whether (1) individual project objectives were identified and achieved, (2) PACE…

  12. Successful practices in title III implementation. Chemical Emergency Preparedness and Prevention Technical Assistance Bulletin. Cameron County, Texas; Bucks County, Pennsylvania; Harford County, Maryland; Dallas County, Texas. Series 6, Number 7

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    This is another in a series of bulletins EPA is issuing to provide examples of implementation programs and strategies of the Emergency Planning and Community Right-to-Know Act of 1986, known as Title III, that are innovative or have proven effective. The purpose of these bulletins is to share information on successful practices with Local Emergency Planning Committees (LEPCs), State Emergency Response Commissions (SERCs), fire departments, and other Title III implementing agencies throughout the country in the hope that such information will prove useful to other SERCs and LEPCs as their programs develop and evolve. The bulletin discusses Title III implementationmore » for Cameron County in Texas, Bucks County in Pennsylvania, Harford County in Maryland, and Dallas County in Texas.« less

  13. 40 CFR 52.634 - Particulate matter (PM-10) Group III SIP.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.634 Particulate matter (PM-10) Group III SIP. (a) On September 14, 1988, the Governor of Hawaii submitted a revision to the... necessary to satisfy the requirements of the PM-10 Group III SIP. (b) The Hawaii Department of Health has...

  14. 32 CFR 989.3 - Responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... environmental planning policy and provides oversight of the EIAP program. (ii) Determines the level of... § 989.1. (ii) Assists the environmental planning function and the Air Force Legal Services Agency, Trial Judiciary Division (AFLOA/JAJT), in planning and conducting public scoping meetings and hearings. (iii...

  15. The Apple III.

    ERIC Educational Resources Information Center

    Ditlea, Steve

    1982-01-01

    Describes and evaluates the features, performance, peripheral devices, available software, and capabilities of the Apple III microcomputer. The computer's operating system, its hardware, and the commercially produced software it accepts are discussed. Specific applications programs for financial planning, accounting, and word processing are…

  16. 48 CFR 919.7011 - Developmental assistance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... limited to: (1) Management guidance relating to: (i) Financial management, (ii) Organizational management, (iii) Overall business management planning, (iv) Business development, and (v) Marketing assistance; (2... PROGRAMS SMALL BUSINESS PROGRAMS The Department of Energy Mentor-Protege Program 919.7011 Developmental...

  17. E.E.C. 2000: A Study of Environmental Education Centers. Part I and Parts II & III.

    ERIC Educational Resources Information Center

    Minnesota State Dept. of Natural Resources, St. Paul.

    This report of Environmental Education Centers (EECs) presents recommendations development of long range plans for the development and program coordination of EECs in Minnesota. The plan focuses on identifying programming needs, geographic areas to locate facilities, and capital costs for development and creation of a phased-in implementation…

  18. A Guide for Planning Drafting and Design Technology Programs. Section III, Data Collection and Analysis.

    ERIC Educational Resources Information Center

    1971

    This document, the second of three related reports, constitutes the data collection and analysis section of the study designed to provide information for preparing a planning guide for drafting and design technology programs. The curriculum survey instrument mailed to 26 schools, contained questions regarding: (1) length of semesters, (2)…

  19. Global Positioning System III (GPS III)

    DTIC Science & Technology

    2013-12-01

    Galileo satellite navigation system signal, E1. L1C is also compatible with those signals planned for broadcast on Japan’s Quazi-Zenith Satellite...and Galileo constellations, further increasing the accuracy and availability of civil PNT solutions. GPS III December 2013 SAR April 16, 2014...vehicle- level core mate. The overall program continues to make progress on the GPS III Non-Flight Satellite Testbed (GNST), on SV01 development, and

  20. 7 CFR 227.5 - Program funding.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS NUTRITION EDUCATION AND TRAINING PROGRAM General § 227.5 Program funding. (a... assessment in the State, (iii) Developing a State Plan for nutrition education and training within the State...

  1. 7 CFR 227.5 - Program funding.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS NUTRITION EDUCATION AND TRAINING PROGRAM General § 227.5 Program funding. (a... assessment in the State, (iii) Developing a State Plan for nutrition education and training within the State...

  2. 7 CFR 227.5 - Program funding.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS NUTRITION EDUCATION AND TRAINING PROGRAM General § 227.5 Program funding. (a... assessment in the State, (iii) Developing a State Plan for nutrition education and training within the State...

  3. 7 CFR 227.5 - Program funding.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS NUTRITION EDUCATION AND TRAINING PROGRAM General § 227.5 Program funding. (a... assessment in the State, (iii) Developing a State Plan for nutrition education and training within the State...

  4. 7 CFR 227.5 - Program funding.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE CHILD NUTRITION PROGRAMS NUTRITION EDUCATION AND TRAINING PROGRAM General § 227.5 Program funding. (a... assessment in the State, (iii) Developing a State Plan for nutrition education and training within the State...

  5. Materiel Acquisition Management Guide

    DTIC Science & Technology

    1980-02-11

    Ii-n manager and his staff, hiqhlighted by the specific de - tails provided in tabbea one-sheet descriptions. • Part III - Areas of Aco-uisition...support program requirements? Support and Test Equipment (S/TE)? Spares Support (SS)? Storage and transportation ? training? o Have test and...PACKAGES PROCUREMENT PLANNING/ PROCUREMENT pLANS TEST AND EVALUATION - PLANNING PRODUCIBILITY ENGINEERING AND TRAINING PLANNING (PEP) TRANSPORTABILITY

  6. 30 CFR 250.912 - What plans must I submit under the Platform Verification Program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... computer programs used in the design process; and (3) A summary of the major design considerations and the...) Structural tolerances; (ii) Welding procedures; (iii) Material (concrete, gravel, or silt) placement methods...

  7. 40 CFR 52.634 - Particulate matter (PM-10) Group III SIP.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Particulate matter (PM-10) Group III SIP. 52.634 Section 52.634 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.634 Particulate matter...

  8. 7 CFR 1470.22 - Conservation stewardship plan.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., and (iii) Documenting the participant's conservation objectives to reach and exceed stewardship thresholds; (2) A plan map delineating enrolled land with associated acreage amounts; (3) In the case where a... participant's transition to or participation in the National Organic Program; (4) In the case where a...

  9. Developing and Testing Simulated Occupational Experiences for Distributive Education Students in Rural Communities: Volume III: Training Plans: Final Report.

    ERIC Educational Resources Information Center

    Virginia Polytechnic Inst. and State Univ., Blacksburg.

    Volume 3 of a three volume final report presents prototype job training plans developed as part of a research project which pilot tested a distributive education program for rural schools utilizing a retail store simulation plan. The plans are for 15 entry-level and 15 career-level jobs in seven categories of distributive business (department…

  10. Kenston Aerospace: Title III ESEA Project.

    ERIC Educational Resources Information Center

    Kenston Local School District, Chagrin Falls, OH.

    The objectives of a three-year comprehensive aerospace education program at Kenston High School, Chagrin Falls, Ohio, funded under Title III ESEA, were to provide marketable skills for non-College-bound students as well as counseling for the student planning on college or technical school education in the aviation field. Students also were taught…

  11. Planning for Project Continuation.

    ERIC Educational Resources Information Center

    Berry, Grant, Jr.

    Designed to help colleges plan for the successful continuation of educational improvement projects beyond the end of their original funding period, this report presents a case study of Pennsylvania College of Technology's (PCT's) efforts to ensure the continuation of a Title III faculty development program. After describing the the Title III…

  12. 45 CFR 1304.51 - Management systems and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... annual self- assessment; and (iii) The development of written plan(s) for implementing services in each of the program areas covered by this part (e.g., Early Childhood Development and Health Services... SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND FAMILIES, HEAD...

  13. Elementary School Educational Specifications: Facilities Planning Standards. Edition III.

    ERIC Educational Resources Information Center

    Jefferson County School District R-1, Denver, CO.

    The Jefferson County School District (Denver, Colorado) has published this model standard for the planning and designing of new elementary schools, and the remodeling and modernizing existing schools. It describes the facility requirements to accommodate the instructional program, activities, and support functions to assist architects, school…

  14. 34 CFR 428.21 - What selection criteria does the Secretary use?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... individuals enrolled in vocational education programs, and how those needs should influence teaching strategies and program design. (ii) Understanding of bilingual vocational training methodologies. (iii... points) The Secretary reviews each application for an effective plan of management that ensures proper...

  15. 34 CFR 428.21 - What selection criteria does the Secretary use?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... individuals enrolled in vocational education programs, and how those needs should influence teaching strategies and program design. (ii) Understanding of bilingual vocational training methodologies. (iii... points) The Secretary reviews each application for an effective plan of management that ensures proper...

  16. Santa Fe School Precision Teaching Program, Evaluation Report 1974-75.

    ERIC Educational Resources Information Center

    Spencer, Mary L.; Henderson, Joan C.

    The Santa Fe Precision Teaching for Effective Learning, (PTEL) an ESEA Title III program, was selected as a remedial instructional approach to the performance and motivational problems of Santa Fe students. It proposed the following six major program objectives: (1) planning and implementation of start-up activities; (2) staff training in the…

  17. 50 CFR 15.26 - Approval of cooperative breeding programs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-sustaining population in captivity of the exotic bird species; (iii) Details on the system of recordkeeping... the exotic bird species in the world; (v) Details on the funding of this program; and (vi) Plans for... program intended to enhance the survival of the population from which the exotic bird species was or would...

  18. Systematic Instruction for Retarded Children: The Illinois Program. Part III: Self-Help Instruction.

    ERIC Educational Resources Information Center

    Linford, Maxine D.; And Others

    The manual for programed instruction of self care skills for trainable mentally handicapped children consists of dressing, dining, grooming, and toilet training. Teaching methods used include behavioral analysis and management, task analysis, and errorless learning. The lesson plans in each section are programed to maximize the child's success at…

  19. Development of a program logic model and evaluation plan for a participatory ergonomics intervention in construction.

    PubMed

    Jaegers, Lisa; Dale, Ann Marie; Weaver, Nancy; Buchholz, Bryan; Welch, Laura; Evanoff, Bradley

    2014-03-01

    Intervention studies in participatory ergonomics (PE) are often difficult to interpret due to limited descriptions of program planning and evaluation. In an ongoing PE program with floor layers, we developed a logic model to describe our program plan, and process and summative evaluations designed to describe the efficacy of the program. The logic model was a useful tool for describing the program elements and subsequent modifications. The process evaluation measured how well the program was delivered as intended, and revealed the need for program modifications. The summative evaluation provided early measures of the efficacy of the program as delivered. Inadequate information on program delivery may lead to erroneous conclusions about intervention efficacy due to Type III error. A logic model guided the delivery and evaluation of our intervention and provides useful information to aid interpretation of results. © 2013 Wiley Periodicals, Inc.

  20. Development of a Program Logic Model and Evaluation Plan for a Participatory Ergonomics Intervention in Construction

    PubMed Central

    Jaegers, Lisa; Dale, Ann Marie; Weaver, Nancy; Buchholz, Bryan; Welch, Laura; Evanoff, Bradley

    2013-01-01

    Background Intervention studies in participatory ergonomics (PE) are often difficult to interpret due to limited descriptions of program planning and evaluation. Methods In an ongoing PE program with floor layers, we developed a logic model to describe our program plan, and process and summative evaluations designed to describe the efficacy of the program. Results The logic model was a useful tool for describing the program elements and subsequent modifications. The process evaluation measured how well the program was delivered as intended, and revealed the need for program modifications. The summative evaluation provided early measures of the efficacy of the program as delivered. Conclusions Inadequate information on program delivery may lead to erroneous conclusions about intervention efficacy due to Type III error. A logic model guided the delivery and evaluation of our intervention and provides useful information to aid interpretation of results. PMID:24006097

  1. 75 FR 34671 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Limiting Emissions of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-18

    ... From Consumer Products AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY....0--Consumer Products to Delaware's Regulation 1141 (formerly SIP Regulation No. 41)--Limiting... Fernandez, Office of Air Program Planning, Mailcode 3AP30, U.S. Environmental Protection Agency, Region III...

  2. 76 FR 6403 - Western Pacific Fishery Management Council; Public Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-04

    .... Program Planning A. Annual Catch Limit (ACL) Specification Process B. Workshop on ACLs for Coral Reef.... Coastal and Marine Spatial Planning 4. Ecosystem Monitoring and Community Issues A. Report on Coral Reef... Resources i. Coral Reef Fisheries ii. Bottomfish Fisheries iii. Crustacean Fisheries B. National Marine...

  3. Planning for Student Assessment: Participant's Handbook. Bilingual Evaluation Technical Assistance, Workshop III.

    ERIC Educational Resources Information Center

    California Univ., Los Angeles. Center for the Study of Evaluation.

    This participant's handbook is designed to be used in conjunction with a workshop for planning bilingual student assessment. The following materials are included: (1) simulation materials, including descriptions of simulated programs, tests, test manuals, and printouts; (2) checklists, diagrams, and charts illustrating important points of the…

  4. The Annual Report of the National Shipbuilding Research Program (The Naval Shipbuilding Research Program)

    DTIC Science & Technology

    1986-08-29

    Abrasives Work Planning for Shipyard SP&C Training Overcoating of Zinc Primers Citric Acid Cleaning - Phase II - Waterborne Coatings Economics of...members workout organizational problems with minimum government involvement a set of strong, committed, and sometimes fiercely independent panels and...01 Manual of Welding Planning and Design Guidelines - Phase III PANEL SP-3 Ship Design Considerations: Adaptation of Japanese Pre - 7 9 79 81 82 83 83

  5. 45 CFR 2533.10 - Eligible activities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... following activities: (i) Assist entities carrying out State or local community service programs with needs assessments and planning; (ii) Conduct research and evaluations concerning community service; (iii) Provide...

  6. 45 CFR 2533.10 - Eligible activities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... following activities: (i) Assist entities carrying out State or local community service programs with needs assessments and planning; (ii) Conduct research and evaluations concerning community service; (iii) Provide...

  7. 34 CFR 361.18 - Comprehensive system of personnel development.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... preparing vocational rehabilitation professionals, by type of program; (ii) The number of students enrolled at each of those institutions, broken down by type of program; and (iii) The number of students who..., or have the credentials to receive, certification or licensure. (b) Plan for recruitment, preparation...

  8. 34 CFR 361.18 - Comprehensive system of personnel development.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... preparing vocational rehabilitation professionals, by type of program; (ii) The number of students enrolled at each of those institutions, broken down by type of program; and (iii) The number of students who..., or have the credentials to receive, certification or licensure. (b) Plan for recruitment, preparation...

  9. 34 CFR 361.18 - Comprehensive system of personnel development.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... preparing vocational rehabilitation professionals, by type of program; (ii) The number of students enrolled at each of those institutions, broken down by type of program; and (iii) The number of students who..., or have the credentials to receive, certification or licensure. (b) Plan for recruitment, preparation...

  10. 34 CFR 361.18 - Comprehensive system of personnel development.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... preparing vocational rehabilitation professionals, by type of program; (ii) The number of students enrolled at each of those institutions, broken down by type of program; and (iii) The number of students who..., or have the credentials to receive, certification or licensure. (b) Plan for recruitment, preparation...

  11. 34 CFR 361.18 - Comprehensive system of personnel development.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... preparing vocational rehabilitation professionals, by type of program; (ii) The number of students enrolled at each of those institutions, broken down by type of program; and (iii) The number of students who..., or have the credentials to receive, certification or licensure. (b) Plan for recruitment, preparation...

  12. 10 CFR 37.43 - General security program requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... overall security strategy to ensure the integrated and effective functioning of the security program required by this subpart. The security plan must, at a minimum: (i) Describe the measures and strategies... lessons learned; (iii) Relevant results of NRC inspections; and (iv) Relevant results of the licensee's...

  13. 40 CFR 96.205 - Retired unit exemption.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) NOX BUDGET TRADING PROGRAM AND CAIR NOX AND SO2 TRADING PROGRAMS FOR STATE IMPLEMENTATION PLANS CAIR SO2 Trading Program General Provisions § 96.205 Retired unit exemption. (a)(1) Any CAIR SO2 unit that is permanently retired and is not a CAIR SO2 opt-in unit under subpart III of this part shall be...

  14. 40 CFR 52.1270 - Identification of plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... incorporated by reference from 40 CFR 52.21(b)(1)(i)(a) and (b)(1(iii)(t) APC-S-5. In addition, this EPA action... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Identification of plan. 52.1270 Section 52.1270 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED...

  15. 40 CFR 52.1270 - Identification of plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... incorporated by reference from 40 CFR 52.21(b)(1)(i)(a) and (b)(1(iii)(t) APC-S-5. In addition, this EPA action... 40 Protection of Environment 4 2012-07-01 2012-07-01 false Identification of plan. 52.1270 Section 52.1270 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED...

  16. Building Trades. Block III. Floor Framing.

    ERIC Educational Resources Information Center

    Texas A and M Univ., College Station. Vocational Instructional Services.

    This document contains three units of a course on floor framing to be used as part of a building trades program. Each unit consists, first, of an informational lesson, with complete lesson plan for the teacher's use. Included in each lesson plan are the lesson aim; lists of teaching aids, materials, references, and prerequisites for students;…

  17. [State Program of Jobs for the Future. Volume III.

    ERIC Educational Resources Information Center

    Jobs for the Future, Inc., West Somerville, MA.

    This document contains action plans for four states (Colorado, Indiana, Mississippi, and Missouri) involved in the Jobs for the Future program designed to enhance states' ability to handle economic change. The first section, "A Call to Action," discusses what Colorado's public and private sectors must consider doing to meet the…

  18. Local Education Agency Planning Analyst's Procedures. A Vocational Education Planning System for Local School Districts. Volume III.

    ERIC Educational Resources Information Center

    Goldman, Charles I.

    The manual is part of a series to assist in planning procedures for local and State vocational agencies. It details steps required to process a local education agency's data after the data have been coded onto keypunch forms. Program, course, and overhead data are input into a computer data base and error checks are performed. A computer model is…

  19. Space Exploration: Manned and Unmanned Flight. Aerospace Education III.

    ERIC Educational Resources Information Center

    Coard, E. A.

    This book, for use only in the Air Force ROTC training program, deals with the idea of space exploration. The possibility of going into space and subsequent moon landings have encouraged the government and scientists to formulate future plans in this field. Brief descriptions (mostly informative in nature) of these plans provide an account of…

  20. Military Curricula for Vocational & Technical Education. General Purpose Vehicle Mechanic, Block III, 8-10.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. National Center for Research in Vocational Education.

    This plan of instruction, lesson plans, and student materials (study guides, workbooks, and programed texts) for a secondary-postsecondary level course in engine mechanics is one of a number of military-developed curriculum packages selected for adaptation to vocational instruction and curriculum development in a civilian setting. It is the second…

  1. 7 CFR Exhibit A to Subpart B of... - Grant Agreement-Growth Management and Housing Planning for Approved Designated Energy Impacted Areas

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... met; (iii) Problems, delays, or adverse conditions which will materially affect attainment of planned... process which will improve local conditions and alleviate problems associated with increased coal or... Grantee programs, projects, related activities, and problems. (b) The Grantee shall inform the Grantor as...

  2. Radiation Effects in III-V Nanowire Devices

    DTIC Science & Technology

    2016-09-01

    Nanowire Devices Distribution Statement A. Approved for public release; distribution is unlimited. September 2016 HDTRA1-11-1-0021 Steven R...Name: Prof. S. R. J. Brueck Organization/Institution: University of New Mexico Project Title: Radiation Effects in III-V Nanowire Devices What are...the agency approved application or plan. The objectives of this program were to: a) develop a new nanowire transistor technology based on nanoscale

  3. Calibration for the SAGE III/EOS instruments

    NASA Technical Reports Server (NTRS)

    Chu, W. P.; Mccormick, M. P.; Zawodny, J. M.; Mcmaster, L. R.

    1991-01-01

    The calibration plan for the SAGE III instruments for maintaining instrument performance during the Earth Observing System (EOS) mission lifetime is described. The SAGE III calibration plan consists of detailed preflight and inflight calibration on the instrument performance together with the correlative measurement program to validate the data products from the inverted satellite measurements. Since the measurement technique is primarily solar/lunar occultation, the instrument will be self-calibrating by using the sun as the calibration source during the routine operation of the instrument in flight. The instrument is designed to perform radiometric calibration of throughput, spectral, and spatial response in flight during routine operation. Spectral calibration can be performed in-flight from observation of the solar Fraunhofer lines within the spectral region from 290 to 1030 nm wavelength.

  4. Safety Specialist Manpower, Manpower Resources. Volumes II and III.

    ERIC Educational Resources Information Center

    Booz Allen and Hamilton, Inc., Washington, DC.

    These second and third volumes of a four-volume study of manpower in state highway safety programs over the next decade estimate manpower resources by state and in national aggregate and describe present and planned training programs for safety specialists. For each educational level, both total manpower and manpower actually available for…

  5. Course Outline Workshop III: Paraprofessional Training.

    ERIC Educational Resources Information Center

    Burron, Arni, Comp.; Santopietro, Kathy, Comp.

    The materials in this teaching guide represent the third quarter of a community college program designed to teach paraprofessionals how to tutor in an adult literacy program. Techniques for teaching reading and English as a second language are included. Lesson plans for five classes cover the informal reading inventory, review and practice in the…

  6. Toward a Natural Speech Understanding System

    DTIC Science & Technology

    1989-10-01

    WALTER J. SENUS Technical Director Directorate of Intelligence & Reconnaissance FOR THE COMMANDER JAMES W. HYDE III V Directorate of Plans & Programs ...applicable) Human Resources Laboratory F30602-81-C-0193 8 . ADDRESS (City, State, and ZIP Code) 10. SOURCE OF FUNDING NUMBERS PROGRAM PROJECT TASK WORK...error rates for distinctive words produced in isolation by a single speaker, and their simple programming requirements. Template-matching systems rank

  7. Three-Year College Discovery Master Plan, Bronx Community College, 1998-2001, Parts I-III.

    ERIC Educational Resources Information Center

    Smith, Shirley; Santa Rita, Emilio

    Bronx Community College created a three-year College Discovery (CD) master plan for 1998-2001 to help restructure its counseling programs and support services and enable CD students to acquire an associate's degree level of education. The first area of restructuring is in the role of the director of College Discovery and Counseling. General…

  8. 76 FR 30600 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revisions to Clean Air...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-26

    ... business hours at the Air Protection Division, U.S. Environmental Protection Agency, Region III, 1650 Arch...) with a State plan based on the CAIR model rule that would allow subject sources, non-EGUs from its... program, definitions associated with the State's decision to bring its non-EGUs from its NO X SIP Call...

  9. 167. ARAIII Plot plan as of 1986. Shows most of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    167. ARA-III Plot plan as of 1986. Shows most of original army buildings in addition to location for buildings ARA-621 and ARA-630, which were built in 1969 after army program had been canceled. Date: March 1986. Ineel index code no. 063-0100-00-220-421241. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  10. Upgrade of Irradiation Test Capability of the Experimental Fast Reactor Joyo

    NASA Astrophysics Data System (ADS)

    Sekine, Takashi; Aoyama, Takafumi; Suzuki, Soju; Yamashita, Yoshioki

    2003-06-01

    The JOYO MK-II core was operated from 1983 to 2000 as fast neutron irradiation bed. In order to meet various requirements for irradiation tests for development of FBRs, the JOYO upgrading project named MK-III program was initiated. The irradiation capability in the MK-III core will be about four times larger than that of the MK-II core. Advanced irradiation test subassemblies such as capsule type subassembly and on-line instrumentation rig are planned. As an innovative reactor safety system, the irradiation test of Self-Actuated Shutdown System (SASS) will be conducted. In order to improve the accuracy of neutron fluence, the core management code system was upgraded, and the Monte Carlo code and Helium Accumulation Fluence Monitor (HAFM) were applied. The MK-III core is planned to achieve initial criticality in July 2003.

  11. Installation Restoration Program Records Search for Westover Air Force Base, Massachusetts.

    DTIC Science & Technology

    1982-04-01

    Phase III (not part of this contract) consists of a technology base development study to support the development of project plans for controlling...determine the extent and magnitude of the contaminant migration. Phase III (not part of this contract) consists of a technology base development study to...number of vegetation studies have attempted to classify the potential climax vegetation within the region of Westover AFB (Braun, 1972; Kuchler, 1975

  12. 12 CFR 618.8440 - Planning.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... workforce and management succession programs; and (iii) Strategies and actions to strive for diversity and... description of the institution's chartered territory by market segment, including the characteristics of demography, geography, and types of agriculture practiced; and (ii) Strategies and actions to market the...

  13. 12 CFR 618.8440 - Planning.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... workforce and management succession programs; and (iii) Strategies and actions to strive for diversity and... description of the institution's chartered territory by market segment, including the characteristics of demography, geography, and types of agriculture practiced; and (ii) Strategies and actions to market the...

  14. 7 CFR 2.24 - Assistant Secretary for Administration.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... determining whether to continue, modify, or terminate an information technology program or project. (iii... technology to improve productivity in the Department. (P) Plan, develop, install, and operate computer-based systems for message exchange, scheduling, computer conferencing, televideo technologies, and other...

  15. CMIF ECLS system test findings

    NASA Technical Reports Server (NTRS)

    Schunk, Richard G.; Carrasquillo, Robyn L.; Ogle, Kathyrn Y.; Wieland, Paul O.; Bagdigian, Robert M.

    1989-01-01

    During 1987 three Space Station integrated Environmental Control and Life Support System (ECLSS) tests were conducted at the Marshall Space Flight Center (MSFC) Core Module Integration Facility (CMIF) as part of the MSFC ECLSS Phase II test program. The three tests ranged in duration from 50 to 150 hours and were conducted inside of the CMIF module simulator. The Phase II partial integrated system test configuration consisted of four regenerative air revitalization subsystems and one regenerative water reclamation subsystem. This paper contains a discussion of results and lessons learned from the Phase II test program. The design of the Phase II test configuration and improvements made throughout the program are detailed. Future plans for the MSFC CMIF test program are provided, including an overview of planned improvements for the Phase III program.

  16. 32 CFR 103.5 - Responsibilities.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... program guidance, joint planning objectives, standard terminology, and identify legislative changes needed... with this part and DoDI 6495.02. (2) Coordinate all Military Service SAPR policy changes with the USD(P... consists of six pillars: (i) Influencing Policy (ii) Changing Organizational Practices (iii) Fostering...

  17. 32 CFR 103.5 - Responsibilities.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... program guidance, joint planning objectives, standard terminology, and identify legislative changes needed... with this part and DoDI 6495.02. (2) Coordinate all Military Service SAPR policy changes with the USD(P... consists of six pillars: (i) Influencing Policy (ii) Changing Organizational Practices (iii) Fostering...

  18. 32 CFR 103.5 - Responsibilities.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... program guidance, joint planning objectives, standard terminology, and identify legislative changes needed... with this part and DoDI 6495.02. (2) Coordinate all Military Service SAPR policy changes with the USD(P... consists of six pillars: (i) Influencing Policy (ii) Changing Organizational Practices (iii) Fostering...

  19. 40 CFR 147.3015 - Information to be considered for Class III wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROGRAMS Lands of the Navajo, Ute Mountain Ute, and All Other New Mexico Tribes § 147.3015 Information to... quality as required for aquifer cleanup by § 147.3011 of this subpart. (3) An aquifer cleanup plan if...

  20. 40 CFR 147.3015 - Information to be considered for Class III wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS Lands of the Navajo, Ute Mountain Ute, and All Other New Mexico Tribes § 147.3015 Information to... quality as required for aquifer cleanup by § 147.3011 of this subpart. (3) An aquifer cleanup plan if...

  1. Applications for Micrographics in Large Scale Information Systems of the Future. Volume II: Part III. A Review of Micrographics State-of-the-Art.

    ERIC Educational Resources Information Center

    Information Dynamics Corp., Reading, MA.

    A five-year development program plan was drawn up for the Defense Documentation Center (DDC). This report presents in summary form the results of various surveys and reviews performed in selected areas of micrographics to support the efforts of the program's planners. Exhibits of supporting documentation are presented, together with a discussion…

  2. Bridging the Technology Valley of Death in Joint Medical Development

    DTIC Science & Technology

    2015-11-01

    Force lieutenant colonel, is the Air Force Medical Support Agency Advanced Development Liaison Field Engineer in Falls Church, Virginia. Prusaczyk is...Awareness, communication and coordination may be mini - mal among Service S&T and AD programs. Joint Transition Planning Process A Joint Transition...Human Proof of Phase III NDA/BLA ling Approval, Launch Concept*** Launch Review Program Initiation Materiel Technology Engineering & Production

  3. Asset management for Wyoming counties : volume I, II, III.

    DOT National Transportation Integrated Search

    2011-08-01

    Vol. 1: In the fall of 2003, the Wyoming Department of Transportation (WYDOT) and the Wyoming T2/LTAP Center (T2/LTAP) began planning an asset management program to assist counties impacted by oil and gas drilling with management of their road system...

  4. 75 FR 71135 - Notice of Meeting; Advisory Council on Historic Preservation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-22

    ... Welcome II. Chairman's Report III. Executive Director's Report IV. Native American Activities A. Native American Program Report 1. HUD Delegation of Tribal Consultation Responsibilities 2. DOI-DoD-ACHP.... Strategic Planning: Next Steps VI. Sustainability and Historic Preservation Task Force VII. Preservation...

  5. 20 CFR 628.803 - Eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... training plan, age 14 through 21 inclusive; and (2)(i) Economically disadvantaged; or (ii) Participating in a compensatory education program under Chapter I of title I of the Elementary and Secondary Education Act of 1965; or (iii) Has been determined to meet the eligibility requirements for free meals...

  6. 20 CFR 628.803 - Eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... training plan, age 14 through 21 inclusive; and (2)(i) Economically disadvantaged; or (ii) Participating in a compensatory education program under Chapter I of title I of the Elementary and Secondary Education Act of 1965; or (iii) Has been determined to meet the eligibility requirements for free meals...

  7. 42 CFR 56.104 - Application.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR MIGRANT HEALTH SERVICES... grants for planning and development of migrant health centers), subpart C (relating to grants for the... and State health and social service programs; and (iii) The boundaries of such area eliminate, to the...

  8. 42 CFR 56.104 - Application.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR MIGRANT HEALTH SERVICES... grants for planning and development of migrant health centers), subpart C (relating to grants for the... and State health and social service programs; and (iii) The boundaries of such area eliminate, to the...

  9. 42 CFR 56.104 - Application.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR MIGRANT HEALTH SERVICES... grants for planning and development of migrant health centers), subpart C (relating to grants for the... and State health and social service programs; and (iii) The boundaries of such area eliminate, to the...

  10. 23 CFR 924.9 - Planning.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... public roads; (E) Adopts a strategic safety goal; (F) Identifies key emphasis areas and describes a... infrastructure safety problems and opportunities on all public roads and all users, and focuses resources on... approved by the FHWA Division Administrator. (iii) Develop a High Risk Rural Roads program using safety...

  11. 42 CFR 59.206 - Evaluation and grant award.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR FAMILY... and health services personnel; (iii) Improvement in the utilization and career development of..., particularly in rural areas, through new or improved approaches to program planning and deployment of resources...

  12. Project Success for the SLD Child, Curriculum Modification.

    ERIC Educational Resources Information Center

    Owens, Jean

    The curriculum modification guide, developed by project success (Nebraska) through a Title III grant for language disabled elementary level students, contains suggested activities and instructional materials to be used in units of art, health, mathematics, music, science, and social studies. Explained are program planning, criteria for selecting…

  13. 78 FR 29382 - Proposed Collection, Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-20

    ... programs established by the 1998 Workforce Investment Act (WIA) and the Perkins Vocational Education Act of.... These data assist in the development of State vocational education plans. OES wage data provide a... survey form. III. Desired Focus of Comments The Bureau of Labor Statistics is particularly interested in...

  14. 42 CFR 51c.104 - Application.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR COMMUNITY HEALTH... areas served by Federal and State health and social service programs; and (iii) The boundaries of such... services to be provided by the project (or in the case of applications for planning and development...

  15. 42 CFR 51c.104 - Application.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR COMMUNITY HEALTH... areas served by Federal and State health and social service programs; and (iii) The boundaries of such... services to be provided by the project (or in the case of applications for planning and development...

  16. 42 CFR 51c.104 - Application.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR COMMUNITY HEALTH... areas served by Federal and State health and social service programs; and (iii) The boundaries of such... services to be provided by the project (or in the case of applications for planning and development...

  17. 42 CFR 51c.104 - Application.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR COMMUNITY HEALTH... areas served by Federal and State health and social service programs; and (iii) The boundaries of such... services to be provided by the project (or in the case of applications for planning and development...

  18. 42 CFR 51c.104 - Application.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR COMMUNITY HEALTH... areas served by Federal and State health and social service programs; and (iii) The boundaries of such... services to be provided by the project (or in the case of applications for planning and development...

  19. 7 CFR 761.210 - CL funds.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... who will use the loan funds to convert to a sustainable or organic agriculture production system as... sustainable or organic production system, or (ii) An organic plan, approved by a certified agent and the State organic certification program, or (iii) A grant awarded by the Sustainable Agriculture Research and...

  20. 7 CFR 761.210 - CL funds.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... who will use the loan funds to convert to a sustainable or organic agriculture production system as... sustainable or organic production system, or (ii) An organic plan, approved by a certified agent and the State organic certification program, or (iii) A grant awarded by the Sustainable Agriculture Research and...

  1. 7 CFR 761.210 - CL funds.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... who will use the loan funds to convert to a sustainable or organic agriculture production system as... sustainable or organic production system, or (ii) An organic plan, approved by a certified agent and the State organic certification program, or (iii) A grant awarded by the Sustainable Agriculture Research and...

  2. 10 CFR 420.15 - Minimum criteria for required program activities for plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    .../vanpool matching and promotion campaign; (ii) Park-and-ride lots; (iii) Preferential traffic control for... employees; (x) Urban area traffic restrictions; (xi) Geographical or time restrictions on automobile use; or... efficiency standards for renovated buildings. (e) A traffic law or regulation which permits the operator of a...

  3. 10 CFR 420.15 - Minimum criteria for required program activities for plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    .../vanpool matching and promotion campaign; (ii) Park-and-ride lots; (iii) Preferential traffic control for... employees; (x) Urban area traffic restrictions; (xi) Geographical or time restrictions on automobile use; or... efficiency standards for renovated buildings. (e) A traffic law or regulation which permits the operator of a...

  4. 10 CFR 420.15 - Minimum criteria for required program activities for plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    .../vanpool matching and promotion campaign; (ii) Park-and-ride lots; (iii) Preferential traffic control for... employees; (x) Urban area traffic restrictions; (xi) Geographical or time restrictions on automobile use; or... efficiency standards for renovated buildings. (e) A traffic law or regulation which permits the operator of a...

  5. 40 CFR 52.253 - Metal surface coating thinner and reducer.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Metal surface coating thinner and... PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.253 Metal surface... Counties Air Basin portion). (iii) This section is rescinded for metal parts and products coaters which are...

  6. 20 CFR 627.902 - Governor's actions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Governor's actions. 627.902 Section 627.902... PROGRAMS UNDER TITLES I, II, AND III OF THE ACT Transition Provisions § 627.902 Governor's actions. The...) Modify the Governor's coordination and special services plan in accordance with instructions issued by...

  7. 34 CFR 403.190 - What are the requirements for receiving a subgrant or contract?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... assessed and the planned use of funds to meet those needs; (iii) How access to programs of good quality will be provided to students who are economically disadvantaged (including foster children), students with disabilities, and students of limited English proficiency through affirmative outreach and...

  8. 34 CFR Appendix A to Subpart N of... - Sample Default Prevention Plan

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... relevant default prevention statistics, including a statistical analysis of the borrowers who default on...'s delinquency status by obtaining reports from data managers and FFEL Program lenders. 5. Enhance... academic study. III. Statistics for Measuring Progress 1. The number of students enrolled at your...

  9. 34 CFR 664.31 - What selection criteria does the Secretary use?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... foreign languages and area studies. (iii) The extent to which direct experience abroad is necessary to... POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION FULBRIGHT-HAYS GROUP PROJECTS ABROAD PROGRAM How Does the... Fulbright Foreign Scholarship Board Group Projects Abroad for funding under this part. (a) Plan of operation...

  10. 34 CFR 664.31 - What selection criteria does the Secretary use?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... foreign languages and area studies. (iii) The extent to which direct experience abroad is necessary to... POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION FULBRIGHT-HAYS GROUP PROJECTS ABROAD PROGRAM How Does the... Fulbright Foreign Scholarship Board Group Projects Abroad for funding under this part. (a) Plan of operation...

  11. 34 CFR 664.31 - What selection criteria does the Secretary use?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... foreign languages and area studies. (iii) The extent to which direct experience abroad is necessary to... POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION FULBRIGHT-HAYS GROUP PROJECTS ABROAD PROGRAM How Does the... Fulbright Foreign Scholarship Board Group Projects Abroad for funding under this part. (a) Plan of operation...

  12. 34 CFR 664.31 - What selection criteria does the Secretary use?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... foreign languages and area studies. (iii) The extent to which direct experience abroad is necessary to... POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION FULBRIGHT-HAYS GROUP PROJECTS ABROAD PROGRAM How Does the... Fulbright Foreign Scholarship Board Group Projects Abroad for funding under this part. (a) Plan of operation...

  13. 34 CFR 664.31 - What selection criteria does the Secretary use?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... foreign languages and area studies. (iii) The extent to which direct experience abroad is necessary to... POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION FULBRIGHT-HAYS GROUP PROJECTS ABROAD PROGRAM How Does the... Fulbright Foreign Scholarship Board Group Projects Abroad for funding under this part. (a) Plan of operation...

  14. 34 CFR 403.18 - What are the membership requirements of a State council on vocational education?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... VOCATIONAL AND APPLIED TECHNOLOGY EDUCATION PROGRAM What Are the State's Organizational and Planning... institutions); (ii) Career guidance and counseling organizations within the State; and (iii) Individuals who have special knowledge and qualifications with respect to the special educational and career...

  15. 34 CFR 403.18 - What are the membership requirements of a State council on vocational education?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... VOCATIONAL AND APPLIED TECHNOLOGY EDUCATION PROGRAM What Are the State's Organizational and Planning... institutions); (ii) Career guidance and counseling organizations within the State; and (iii) Individuals who have special knowledge and qualifications with respect to the special educational and career...

  16. 34 CFR 403.18 - What are the membership requirements of a State council on vocational education?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... VOCATIONAL AND APPLIED TECHNOLOGY EDUCATION PROGRAM What Are the State's Organizational and Planning... institutions); (ii) Career guidance and counseling organizations within the State; and (iii) Individuals who have special knowledge and qualifications with respect to the special educational and career...

  17. 34 CFR 403.18 - What are the membership requirements of a State council on vocational education?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... VOCATIONAL AND APPLIED TECHNOLOGY EDUCATION PROGRAM What Are the State's Organizational and Planning... institutions); (ii) Career guidance and counseling organizations within the State; and (iii) Individuals who have special knowledge and qualifications with respect to the special educational and career...

  18. 40 CFR 52.221 - Classification of regions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.221 Classification of regions. The California plan was evaluated on the basis of the following classifications: Air quality control... III III III Southeast Desert Intrastate I III III III I San Diego Intrastate II III III I I Lake...

  19. 40 CFR 52.221 - Classification of regions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.221 Classification of regions. The California plan was evaluated on the basis of the following classifications: Air quality control... III III III Southeast Desert Intrastate I III III III I San Diego Intrastate II III III I I Lake...

  20. 40 CFR 52.221 - Classification of regions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.221 Classification of regions. The California plan was evaluated on the basis of the following classifications: Air quality control... III III III Southeast Desert Intrastate I III III III I San Diego Intrastate II III III I I Lake...

  1. 40 CFR 52.1521 - Classification of regions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Hampshire § 52.1521 Classification of regions. The New Hampshire plan was evaluated on the basis of the following classifications... Ozone Androscoggin Valley Interstate IA IA III III III Central New Hampshire Intrastate III III III III...

  2. 40 CFR 52.1521 - Classification of regions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Hampshire § 52.1521 Classification of regions. The New Hampshire plan was evaluated on the basis of the following classifications... Ozone Androscoggin Valley Interstate IA IA III III III Central New Hampshire Intrastate III III III III...

  3. 40 CFR 52.1521 - Classification of regions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Hampshire § 52.1521 Classification of regions. The New Hampshire plan was evaluated on the basis of the following classifications... Ozone Androscoggin Valley Interstate IA IA III III III Central New Hampshire Intrastate III III III III...

  4. 40 CFR 52.73 - Approval of plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Strategies (Section III.B.5), Modeling and Projections (Section III.B.6), Contingency Plan (Section III.B.7...), Modeling and Projections (Section III.C.6), and Air Quality Conformity Procedures (Section III.C.10); and...

  5. Defense Advanced Research Projects Agency Strategic Plan

    DTIC Science & Technology

    2007-02-01

    be able to feel objects that are being grasped so that the prosthesis is experienced as an arm instead of as a tool; and (iii) development of...instrument, but also the ability to sense an artificial limb’s position without looking at it, and to actually " feel " precisely what the artificial limb...is touching by relaying sensations through residual nerves. (This program is also leveraging developments in a core technology program, Human Assisted

  6. 40 CFR 52.1971 - Classification of regions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oregon § 52.1971 Classification of regions. The Oregon plan was evaluated on the basis of the following classifications: Air quality control... Interstate I IA III I I Southwest Oregon Intrastate II III III III III Northwest Oregon Intrastate III III...

  7. 40 CFR 52.1971 - Classification of regions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oregon § 52.1971 Classification of regions. The Oregon plan was evaluated on the basis of the following classifications: Air quality control... Interstate I IA III I I Southwest Oregon Intrastate II III III III III Northwest Oregon Intrastate III III...

  8. Dosimetric comparison of three intensity-modulated radiation therapies for left breast cancer after breast-conserving surgery.

    PubMed

    Zhang, Huai-Wen; Hu, Bo; Xie, Chen; Wang, Yun-Lai

    2018-05-01

    This study aimed to evaluate dosimetric differences of intensity-modulated radiation therapy (IMRT) in target and normal tissues after breast-conserving surgery. IMRT five-field plan I, IMRT six-field plan II, and field-in-field-direct machine parameter optimization-IMRT plan III were designed for each of the 50 patients. One-way analysis of variance was performed to compare differences, and P < 0.05 was considered statistically significant. Homogeneity index of plan III is lower than those of plans I and II. No difference was identified in conformity index of targets. Plan I exhibited difference in mean dose (D mean ) for the heart (P < 0.05). Plan I featured smaller irradiation dose volumes in V 5 , V 20 (P < 0.05) of the left lung than II. Plan I exhibited significantly higher V 5 in the right lung than plans II and III (P < 0.05). Under plan I, irradiation dose at V 5 in the right breast is higher than that in plans II and III. Patients in plan III presented less total monitor unit and total treatment time than those in plans I and II (P < 0.05). IMRT six-field plans II, and field-in-field-direct machine parameter optimization-IMRT plans III can reduce doses and volumes to the lungs and heart better while maintaining satisfying conformity index and homogeneity index of target. Nevertheless, plan II neglects target movements caused by respiration. In the same manner, plan III can substantially reduce MU and shorten patient treatment time. Therefore, plan III, which considers target movement caused by respiration, is a more practical radiation mode. © 2018 The Authors. Journal of Applied Clinical Medical Physics published by Wiley Periodicals, Inc. on behalf of American Association of Physicists in Medicine.

  9. Comprehensive Approach to Pupil Planning: Stage III - Instructional Planning (Includes Data Sources Within the CAPP System and Teacher's Instructional Plan). Experimental Edition.

    ERIC Educational Resources Information Center

    Vlasak, Frances Stetson; Kaufman, Martin J.

    Presented is Stage III of the Comprehensive Approach to Pupil Planning (CAPP) System, a three-stage model for planning educational interventions in the regular and special education classrooms and for guiding placement decisions. The guide focuses on the instructional planning team with sections on the following: Stage III personnel; roles and…

  10. Weapon System Management to Directorate of Logistics Management Systems Requirements (XRB) DCS/Plans and Programs Air Force Logistics Command Wright-Patterson AFB, Ohio 45433.

    DTIC Science & Technology

    1982-05-14

    Attachment 2 contains the reports and lessons learned which resulted from the Level II Weapon System Management activities. Attachment 3 contains the reports...and lessons learned which resulted from the Level III Weapon System Management activities. _____ r. Air Force Logistics Command Attn: Col. McConnell 2...May 14, 1982 Attachment 4 contains the plans and lessons learned which resulted from the RCC Evaluation activities. I am pleased to deliver these

  11. 46 CFR 199.190 - Operational readiness, maintenance, and inspection of lifesaving equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... each fuel tank must be emptied, cleaned, and refilled with fresh fuel. (2) Each davit, winch, fall, and... required under paragraph (e) of this section. (ii) Maintenance and repair instructions. (iii) A schedule of... planned maintenance program that includes the items listed in that paragraph. (c) Spare parts and repair...

  12. 46 CFR 199.190 - Operational readiness, maintenance, and inspection of lifesaving equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... each fuel tank must be emptied, cleaned, and refilled with fresh fuel. (2) Each davit, winch, fall, and... required under paragraph (e) of this section. (ii) Maintenance and repair instructions. (iii) A schedule of... planned maintenance program that includes the items listed in that paragraph. (c) Spare parts and repair...

  13. 46 CFR 199.190 - Operational readiness, maintenance, and inspection of lifesaving equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... each fuel tank must be emptied, cleaned, and refilled with fresh fuel. (2) Each davit, winch, fall, and... required under paragraph (e) of this section. (ii) Maintenance and repair instructions. (iii) A schedule of... planned maintenance program that includes the items listed in that paragraph. (c) Spare parts and repair...

  14. 46 CFR 199.190 - Operational readiness, maintenance, and inspection of lifesaving equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... each fuel tank must be emptied, cleaned, and refilled with fresh fuel. (2) Each davit, winch, fall, and... required under paragraph (e) of this section. (ii) Maintenance and repair instructions. (iii) A schedule of... planned maintenance program that includes the items listed in that paragraph. (c) Spare parts and repair...

  15. TEXAS EDUCATIONAL MICROWAVE PROJECT, TEMP III.

    ERIC Educational Resources Information Center

    SCHENKKAN, R.F.; AND OTHERS

    MICROWAVE TRANSMITTERS WERE USED TO LINK 11 INSTITUTIONS OF HIGHER LEARNING IN THE CENTRAL TEXAS AREA. THIS DEMONSTRATION WAS PLANNED AS A PILOT PROGRAM FOR THE USE OF MICROWAVE CHANNELS TO ACHIEVE A SINGLE CLOSED-CIRCUIT SYSTEM AMONG A NUMBER OF INSTITUTIONS. THE OBJECTIVES WERE (1) TO DEMONSTRATE THE FEASIBILITY, BOTH ECONOMIC AND PROGRAMMATIC,…

  16. PATHS - Providing Appropriate Training in Head Start: A Grantee Guide.

    ERIC Educational Resources Information Center

    Riley, Mary Tom; And Others

    Designed for Head Start grantees, this book provides training guidelines for improving Head Start staff competency. Chapter I offers a rationale for staff training activities, while chapter II characterizes the Head Start trainee. Chapter III addresses assessment of training needs on program and staff levels. The development of a training plan is…

  17. 78 FR 22850 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-17

    ... million * As defined in Section 47(6) of the Arms Export Control Act. (iii) Description and Quantity or... software continues to be modified via a pre-planned product improvement (P3I) program in order to improve its counter- countermeasure capabilities. No software source code or algorithms will be released. The...

  18. 40 CFR 52.1671 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New York § 52.1671 Classification of regions. The New York plans were evaluated on the basis of the following classifications: Air... II III III III Central New York Intrastate I II III I I Genesee-Finger Lakes Intrastate II II III III...

  19. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1994.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1994-02-01

    This document is part of Bonneville Power Administration`s program to protect, mitigate, and enhance fish and wildlife affected by the development and operation of hydroelectric facilities on the Columbia River and its tributaries. The Fiscal Year 1994 (FY 1994) Annual Implementation Work Plan (AIWP) presents Bonneville Power Administration`s (BPA`s) plan for implementation of the Columbia River Basin Fish and Wildlife Program (Program). The purpose of the Program is to guide BPA and other federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife in the Columbia River Basin. Phase I began the work of salmonmore » recovery with certain fast-track measures completed in August 1991. Phase II dealt with Snake and Columbia river flow and salmon harvest and was completed in December 1991. Phase III dealt with system-wide habitat and salmon production issues and was completed in September 1992. Phase IV planning, focusing on resident fish and wildlife, began in August 1993, and was finished and adopted in November 1993. This report provides summaries of the ongoing and new projects for FY 1994 within the areas of juvenile migration, adult migration, salmon harvest, production and habitat, coordinated implementation, monitoring and evaluation, resident fish, and wildlife.« less

  20. Mexican humanitarian assistance system.

    DTIC Science & Technology

    2016-05-26

    Stabilization Mission in Haiti, SEDENA, Plan-DN-III- E , international relief system, Cluster system, Organization of American States, Conference of American...strategic plan for disaster relief—Plan DN-III- E . The plan contains annexes with specific instructions to different military actors and, because of...2FSArticuloSinPaginaLayout. 9 “Gaceta Parlamentaria 22 Apr 2010.” 10 Estado Mayor Defensa Nacional, Plan DN-III- E : Auxilio a La Poblacion Civil En Casos

  1. Central Alaska Network vital signs monitoring plan

    USGS Publications Warehouse

    MacCluskie, Margaret C.; Oakley, Karen L.; McDonald, Trent; Wilder, Doug

    2005-01-01

    Denali National Park and Preserve, Wrangell-St. Elias National Park and Preserve, and Yukon-Charley Rivers National Preserve have been organized into the Central Alaska Network (CAKN) for the purposes of carrying out ecological monitoring activities under the National Park Services’ Vital Signs Monitoring program. The Phase III Report is the initial draft of the Vital Signs Monitoring Plan for the Central Alaska Network. It includes updated material from the Phase I and II documents. This report, and draft protocols for 11 of the network’s Vital Signs, were peer reviewed early in 2005. Review comments were incorporated into the document bringing the network to the final stage of having a Vital Signs Monitoring Plan. Implementation of the program will formally begin in FY 2006. The broad goals of the CAKN monitoring program are to: (1) better understand the dynamic nature and condition of park ecosystems; and (2) provide reference points for comparisons with other, altered environments. The focus of the CAKN program will be to monitor ecosystems in order to detect change in ecological components and in the relationships among the components. Water quality monitoring is fully integrated within the CAKN monitoring program. A monitoring program for lentic (non-moving water) has been determined, and the program for lotic systems (moving water) is under development.

  2. Farm Business Management Analysis: Adjusting the Farm Business to Increase Profit. Unit III. Volume 15, Number 3. Instructor's Guide.

    ERIC Educational Resources Information Center

    Denker, Robert; And Others

    Designed primarily for Missouri vocational agricultural instructors participating in the Farm Business Management Analysis Program, this instructor's guide, consisting of 10 lessons, deals with adjusting a farm business to increase profits. The following topics are covered in the individual lessons: law and the farm family, planning income tax…

  3. 75 FR 43892 - Approval and Promulgation of Implementation Plans; New York Prevention of Significant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-27

    ... proposal related to the Tailoring Rule thresholds. III. What is EPA's analysis of New York's NSR rule...) Program. New York's amendments to Part 201 revise the definition for ``major stationary source or major... Parts 200 and 201, including the new or revised definitions are consistent with Federal guidance, EPA is...

  4. Putting a Medical Library Online: Phase III--Remote Access to CD-ROMs.

    ERIC Educational Resources Information Center

    Kittle, Paul

    1989-01-01

    Describes the implementation of a project that provides dial-up access to MEDLINE on remote optical data disk (CD-ROM) using software that enables callers to use programs like Wordstar, Lotus, and dBase. Highlights include networking CD-ROM databases, hardware considerations, advantages and disadvantages of remote access, and future plans. A…

  5. Military Curricula for Vocational & Technical Education. Refrigeration & Air Conditioning Specialist, Blocks I-II.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. National Center for Research in Vocational Education.

    This plan of instruction, study guides, workbooks, and programmed texts for a secondary-postsecondary-level course in refrigeration and air conditioning are one of a number of military-developed curriculum packages selected for adaptation to vocational instruction and curriculum development in a civilian setting. It is the first section of a…

  6. INFORMATION, STANDARDS, AND SPECIFICATIONS FOR EQUIPMENT, MATERIALS, AND MINOR REMODELING FOR MODERN FOREIGN LANGUAGES (REVISED).

    ERIC Educational Resources Information Center

    Illinois State Office of the Superintendent of Public Instruction, Springfield.

    THE INFORMATION INCLUDED IN THIS VERY DETAILED DOCUMENT IS INTENDED FOR TEACHERS AND ADMINISTRATORS PLANNING AND IMPLEMENTING PROGRAMS TO IMPROVE FOREIGN LANGUAGE INSTRUCTION. THE SPECIFICATIONS PRESENTED ARE MINIMUM, BUT THEY MEET THE REQUIREMENTS UNDER THE PROVISIONS OF TITLE III, NDEA. THE FIRST PART OUTLINES PROCEDURES FOR THE SELECTION AND…

  7. Teaching Tennessee History: Lesson Plans for the Classroom. Volume III.

    ERIC Educational Resources Information Center

    Oakley, Lisa, Ed.

    These teacher developed lessons focus on the impact of the New Deal and World War II on east Tennessee. The forum for developing the lessons included a series of lectures by experts in 20th-century scholarship and interpretation, tours, and experiences at historic sites in the region. During the week long program, teachers traveled throughout east…

  8. Statistical Data and Narrative. End of Project Report, 1968-1971, Volume I.

    ERIC Educational Resources Information Center

    Western Nevada Regional Education Center, Lovelock.

    In 1968, the Nevada State Department of Education initiated the establishment of 2 ESEA (Elementary and Secondary Education Act) Title III supplementary centers to aid rural Nevada schools in educational planning. The stated mission of the centers was to assist member school districts in developing new and/or improved educational programs as a…

  9. Survey of the Schools of Wilmington, Delaware. Part 1: I. The Educational Background; II. School Organization, Supervision, and Finance; III. A School Building Program for Wilmington. Bulletin, 1921, No. 2

    ERIC Educational Resources Information Center

    Bureau of Education, Department of the Interior, 1921

    1921-01-01

    During March of 1920, by resolution of the Board of Education of Wilmington, Delaware, a committee of 30 citizens of the city was appointed to make a survey of the public schools and of the system of education of the city. The executive committee was directed to prepare a plan or program to be followed in making the investigation and survey and to…

  10. 40 CFR 52.1221 - Classification of regions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Minnesota § 52.1221 Classification of regions. The Minnesota plan was evaluated on the basis of the following classifications: Air... Photochemical oxidants (hydrocarbons) Central Minnesota Intrastate II III III III III Southeast Minnesota-La...

  11. 40 CFR 52.1221 - Classification of regions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Minnesota § 52.1221 Classification of regions. The Minnesota plan was evaluated on the basis of the following classifications: Air... Photochemical oxidants (hydrocarbons) Central Minnesota Intrastate II III III III III Southeast Minnesota-La...

  12. 40 CFR 52.1221 - Classification of regions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Minnesota § 52.1221 Classification of regions. The Minnesota plan was evaluated on the basis of the following classifications: Air... Photochemical oxidants (hydrocarbons) Central Minnesota Intrastate II III III III III Southeast Minnesota-La...

  13. External Tank Program Legacy of Success

    NASA Technical Reports Server (NTRS)

    Welzyn, Ken; Pilet, Jeff

    2010-01-01

    I.Goal: a) Extensive TPS damage caused by extreme hail storm. b) Repair plan required to restore TPS to minimize program manifest impacts. II. Challenges: a) Skeptical technical community - Concerned about interactions of damage with known/unknown failure modes. b) Schedule pressure to accommodate ISS program- Next tank still at MAF c)Limited ET resources. III. How d We Do It?: a) Developed unique engineering requirements and tooling to minimize repairs. b) Performed large amount of performance testing to demonstrate understanding of repairs and residual conditions. c) Effectively communicated results to technical community and management to instill confidence in expected performance.

  14. 40 CFR 300.215 - Title III local emergency response plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... should be closely coordinated with applicable federal ACPs and state emergency response plans. (b... POLLUTION CONTINGENCY PLAN Planning and Preparedness § 300.215 Title III local emergency response plans... are codified at 40 CFR part 355. (a) Each LEPC is to prepare an emergency response plan in accordance...

  15. 40 CFR 300.215 - Title III local emergency response plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... should be closely coordinated with applicable federal ACPs and state emergency response plans. (b... POLLUTION CONTINGENCY PLAN Planning and Preparedness § 300.215 Title III local emergency response plans... are codified at 40 CFR part 355. (a) Each LEPC is to prepare an emergency response plan in accordance...

  16. 40 CFR 300.215 - Title III local emergency response plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... should be closely coordinated with applicable federal ACPs and state emergency response plans. (b... POLLUTION CONTINGENCY PLAN Planning and Preparedness § 300.215 Title III local emergency response plans... are codified at 40 CFR part 355. (a) Each LEPC is to prepare an emergency response plan in accordance...

  17. 40 CFR 300.215 - Title III local emergency response plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... should be closely coordinated with applicable federal ACPs and state emergency response plans. (b... POLLUTION CONTINGENCY PLAN Planning and Preparedness § 300.215 Title III local emergency response plans... are codified at 40 CFR part 355. (a) Each LEPC is to prepare an emergency response plan in accordance...

  18. 40 CFR 300.215 - Title III local emergency response plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... should be closely coordinated with applicable federal ACPs and state emergency response plans. (b... POLLUTION CONTINGENCY PLAN Planning and Preparedness § 300.215 Title III local emergency response plans... are codified at 40 CFR part 355. (a) Each LEPC is to prepare an emergency response plan in accordance...

  19. 40 CFR 52.621 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.621 Classification of regions. The Hawaii plan was evaluated on the basis of the following classifications: Air quality control region... (hydrocarbons) State of Hawaii II III III III III [37 FR 10860, May 31, 1972] ...

  20. 40 CFR 300.220 - Related Title III issues.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 27 2010-07-01 2010-07-01 false Related Title III issues. 300.220 Section 300.220 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY... PLAN Planning and Preparedness § 300.220 Related Title III issues. Other related Title III requirements...

  1. Developing an educational safety program for pharmacy employees.

    PubMed

    Hayman, J N

    1980-02-01

    The need for developing educational safety programs for pharmacy employees is discussed. A three-part program is offered as a guide for structuring a departmental safety program. Part I deals with environmental hazards such as wet floors, poor lighting, and cluttered walk areas. Precautions that should be taken to avoid accidental exposure to patients with communicable diseases are also included. Hazards that may result from improper handling of materials or equipment are addressed in Part II. Included are precautions for handling chemicals, needles, ladders, and electrical equipment. Proper methods of lifting heavy objects are also discussed. Part III details plans to protect staff members in the event of a fire. Plans for reporting fires and evacuating the pharmacy and hospital are discussed. The outlined program requires self-study by staff members during initial employee orientation, followed by annual retraining. Employees are tested and graded on safety topics, and training records are filed for future reference. The program outlined is thought to offer a simple yet effective means of acquainting staff members with established institutional and departmental safety procedures.

  2. Market analysis and program for use for energy conservation manuals: a marketing plan. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1977-02-25

    The FEA, with a mission to analyze total national energy usage, formulate policy, and stimulate actions that will increase domestic energy supply and decrease energy demand, decided to develop effective energy conservation manuals for decision makers in existing buildings. The manuals developed are: Building Owner's and Manager's Guide to Energy Conservation; Building Operator's Guide to Energy Conservation; and Architect's and Engineer's Guide to Energy Conservation. The background and scope of the entire project which led to the development of the manuals is discussed in the introduction of this publication. Part II, Market Analysis, provides insight into the character of themore » designated audiences for the manuals. Part III, Program for Use, is a marketing and promotion plan for the manuals.« less

  3. Abre La Boca: A Component of the California Plan for the Education of Migrant Children.

    ERIC Educational Resources Information Center

    Levene, Carol

    A 1969 summer program under the Region III Migrant Education Project in Merced County, California, brought dental services to migrant children in the northern San Joaquin Valley. The goal was to screen and test as many children of migratory agricultural workers as possible in a set span of time. The University of California School of Dentistry was…

  4. 40 CFR 52.2571 - Classification of regions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2571 Classification of regions. The Wisconsin plan was evaluated on the basis of the following classifications: Air... Duluth (Minnesota)-Superior (Wisconsin) Interstate I II III III III North Central Wisconsin Intrastate II...

  5. 40 CFR 52.2571 - Classification of regions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2571 Classification of regions. The Wisconsin plan was evaluated on the basis of the following classifications: Air... Duluth (Minnesota)-Superior (Wisconsin) Interstate I II III III III North Central Wisconsin Intrastate II...

  6. 40 CFR 52.2571 - Classification of regions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Wisconsin § 52.2571 Classification of regions. The Wisconsin plan was evaluated on the basis of the following classifications: Air... Duluth (Minnesota)-Superior (Wisconsin) Interstate I II III III III North Central Wisconsin Intrastate II...

  7. 40 CFR 52.2721 - Classification of regions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Puerto Rico § 52.2721 Classification of regions. The Puerto Rico plan was evaluated on the basis of the following classifications. Air... Photochemical oxidants (hydrocarbons) Puerto Rico IA IA III III III [37 FR 10905, May 31, 1972] ...

  8. Biomedical Science, Unit III: The Circulatory System in Health and Science. The Heart and Blood Vessels; Blood and Its Properties; The Urinary Tract. Instructor's Manual. Revised Version, 1976.

    ERIC Educational Resources Information Center

    Biomedical Interdisciplinary Curriculum Project, Berkeley, CA.

    This instructor's manual presents lesson plans for a unit of science within the Biomedical Interdisciplinary Curriculum Project (BICP), a two-year interdisciplinary precollege curriculum aimed at preparing high school students for entry into college and vocational programs leading to a career in the health field. Lessons concentrate on the…

  9. Cooperative Program Improvement; An Experiment in ABE In-Service Training. Doolittle Family Education Center Experimental In-Service Training Project. Final Report.

    ERIC Educational Resources Information Center

    Griffith, William S.; And Others

    This document, consisting of seven chapters and 12 appendixes, is a full final report of the Doolittle Family Education Center Experimental In-Service Training Project. Chapter II consists of the history and plan of the project including an explanation of the framework of the model that was used to conceptualize the project. Chapter III is a…

  10. Public speaking for the healthcare professional: Part III--after the program.

    PubMed

    Baum, Neil

    2012-01-01

    Public speaking is one of life's greatest fears for many people. However, with practice, repetition, and planning, you can safely leave your comfort zone and make a presentation that will engage the members of the audience, attract their attention, and cause them to take action on your material. This third article in the series will discuss what to do after the last slide is shown.

  11. Computerized fracture critical and specialized bridge inspection program with NDE applications

    NASA Astrophysics Data System (ADS)

    Fish, Philip E.

    1998-03-01

    Wisconsin Department of Transportation implemented a Fracture Critical & Specialized Inspection Program in 1987. The program has a strong emphasis on Nondestructive Testing (NDT). The program is also completely computerized, using laptop computers to gather field data, digital cameras for pictures, and testing equipment with download features. Final inspection reports with detailed information can be delivered within days of the inspection. The program requires an experienced inspection team and qualified personnel. Individuals performing testing must be licensed ASNT (American Society for Nondestructive Testing) Level III and must be licensed Certified Weld Inspectors (American Welding Society). Several critical steps have been developed to assure that each inspection identifies all possible deficiencies that may be possible on a Fracture Critical or Unique Bridge. They include; review of all existing plans and maintenance history; identification of fracture critical members, identification of critical connection details, welds, & fatigue prone details, development of visual and NDE inspection plan; field inspection procedures; and a detailed formal report. The program has found several bridges with critical fatigue conditions which have resulted in replacement or major rehabilitation. In addition, remote monitoring systems have been installed on structures with serious cracking to monitor for changing conditions.

  12. "India Population Projects" in Karnataka.

    PubMed

    Reddy, P H; Badari, V S

    1991-12-01

    An overview, objectives, implementation, and research and evaluation studies of 2 India Population Projects in Karnataka are presented. The India Population Project I (IPP-I) was conducted in Karnataka and Uttar Pradesh. India Population Project III (IPP-III) took place between 1984-92 in 6 districts of Karnataka: Belgaum, Bijapur, Dharwad, Bidar, Gulbarga, and Raichur, and 4 districts in Kerala. The 6 districts in Karnataka accounted for 36% (13.2 million) of the total national population. The project cost was Rs. 713.1 million which was shared by the World Bank, and the Indian national and regional government. Due to poor past performance, these projects were undertaken to improve health and family welfare status. Specific project objectives are outlined. IPP-I included an urban component, and optimal Government of India program, and an intensive rural initiative. The urban program aimed to improved pre- and postnatal services and facilities, and the family planning (FP) in Bangalore city. The rural program was primarily to provide auxiliary nurse-midwives and hospitals and clinics, and also supplemental feeding program for pregnant and nursing mothers and children up to 2 years. The government program provided FP staff and facilities. IPP-I had 3 units to oversee building construction, to recruit staff and provide supplies and equipment, and to establish a Population Center. IPP-III was concerned with service delivery; information, education, and communication efforts (IEC) and population education; research and evaluation; and project management. Both projects contributed significantly to improving the infrastructure. A brief account of the types and kinds of studies undertaken is given. Studies were grouped into longitudinal studies of fertility, mortality, and FP; management information and evaluation systems for health and family welfare programs; experimental strategies; and other studies. Research and evaluation studies in IPP-III encompassed studies in gaps in knowledge, skills, and practice of health and FP personnel; baseline and endline surveys; and operational evaluation of the management information and evaluation system; factors affecting primary health care in Gulbarga district; evaluation of radio health lessons and the impact of the Kalyana Matha Program; and studies of vaccination and child survival and maternal mortality. Training programs were also undertaken.

  13. Probing Initial Conditions and Outcomes: Star and Planet Formation Programs within the NIRCam GTO Program

    NASA Astrophysics Data System (ADS)

    Meyer, Michael; NIRCam Star and Planet Formation Theme Team

    2017-06-01

    With its extraordinary sensitivity, wavelength coverage from < 1 to 5 microns, 2.2x4.4 arc minute field of view, and diversity of observing modes, NIRCam on JWST offers very powerful capabilities to explore the origins of stars and planets. Here we describe programs planned within the NIRCam GTO Program including: i) extinction mapping of pre-stellar cores; ii) massive star formation; iii) embedded clusters and the end of the IMF; iv) imaging and spectroscopy of young stellar objects; and v) excitation of PAH features. We will describe the scope of each program, selection of observing modes and rationale, as well as provide some explicit examples of program design. We will also review the expected outcomes, illustrating the power of NIRCam to answer questions fundamental to understanding the origins of stars and planets.

  14. Flight test evaluation of the E-systems Differential GPS category 3 automatic landing system

    NASA Technical Reports Server (NTRS)

    Kaufmann, David N.; Mcnally, B. David

    1995-01-01

    Test flights were conducted to evaluate the capability of Differential Global Positioning System (DGPS) to provide the accuracy and integrity required for International Civil Aviation Organization (ICAO) Category (CAT) III precision approach and landings. These test flights were part of a Federal Aviation Administration (FAA) program to evaluate the technical feasibility of using DGPS based technology for CAT III precision approach and landing applications. An IAI Westwind 1124 aircraft (N24RH) was equipped with DGPS receiving equipment and additional computing capability provided by E-Systems. The test flights were conducted at NASA Ames Research Center's Crows Landing Flight Facility, Crows Landing, California. The flight test evaluation was based on completing 100 approaches and landings. The navigation sensor error accuracy requirements were based on ICAO requirements for the Microwave Landing System (MLS). All of the approaches and landings were evaluated against ground truth reference data provided by a laser tracker. Analysis of these approaches and landings shows that the E-Systems DGPS system met the navigation sensor error requirements for a successful approach and landing 98 out of 100 approaches and landings, based on the requirements specified in the FAA CAT III Level 2 Flight Test Plan. In addition, the E-Systems DGPS system met the integrity requirements for a successful approach and landing or stationary trial for all 100 approaches and landings and all ten stationary trials, based on the requirements specified in the FAA CAT III Level 2 Flight Test Plan.

  15. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1992.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1991-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operationmore » of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's plans for implementing the Program during Fiscal Year (FY) 1992. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Action Items 10.1-10.3. The AIWP includes schedules with key milestones for FY 1992 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of May 21, 1991. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-16) lists FY 1992 new-start projects. ''Ongoing'' status indicates that the project started in FY 1991 or before and that it is expected to continue through part or all of FY 1992. ''Deferred'' means that BPA implementation has been postponed to FY 1993 or later. ''Completed'' indicates completion during FY 1991. ''New'' denotes projects planned for BPA implementation in FY 1992. A number of projects are expected to begin in late FY 1991 and have been listed in Table 1 of the AIWP as ''Projected FY '91 Starts,'' based on their projected start dates. Several other projects are expected to end in late FY 1991. These projects have been listed in Table 1 as ''Projected FY '91 Completions,'' based on their projected completion dates.« less

  16. Moving granular-bed filter development program, Option III: Development of moving granular-bed filter technology for multi-contaminant control. Task 14: Test plan; Topical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haas, J.C.; Olivo, C.A.; Wilson, K.B.

    1994-04-01

    An experimental test plan has been prepared for DOE/METC review and approval to develop a filter media suitable for multi-contaminant control in granular-bed filter (GBF) applications. The plan includes identification, development, and demonstration of methods for enhanced media morphology, chemical reactivity, and mechanical strength. The test plan includes media preparation methods, physical and chemical characterization methods for fresh and reacted media, media evaluation criteria, details of test and analytical equipment, and test matrix of the proposed media testing. A filter media composed of agglomerated limestone and clay was determined to be the best candidate for multi-contaminate control in GBF operation.more » The combined limestone/clay agglomerate has the potential to remove sulfur and alkali species, in addition to particulate, and possibly halogens and trace heavy metals from coal process streams.« less

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hoffman, Greg; Marotz, Brian L.; Dunnigan, James

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power Planning Council's resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biologicalmore » effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness.« less

  18. Phase III Early Restoration Meeting | NOAA Gulf Spill Restoration

    Science.gov Websites

    Louisiana Mississippi Texas Region-wide Open Ocean Data Media & News Publications Press Releases Story programmatic approach to early restoration planning for Phase III and future early restoration plans. Open

  19. Phase III Early Restoration Meeting - Corpus Christi, TX | NOAA Gulf Spill

    Science.gov Websites

    Areas Alabama Florida Louisiana Mississippi Texas Region-wide Open Ocean Data Media & News programmatic approach to early restoration planning for Phase III and future early restoration plans. Open

  20. Phase III Early Restoration Meeting - Pensacola, FL (rescheduled) | NOAA

    Science.gov Websites

    Restoration Areas Alabama Florida Louisiana Mississippi Texas Region-wide Open Ocean Data Media & News programmatic approach to early restoration planning for Phase III and future early restoration plans. Open

  1. Ventilation Surge Techniques. Volume I

    DTIC Science & Technology

    1981-12-01

    studying wind-driven ventilation. S-I - . .--. .-.. .F 77I I11. EXPERIMENTAL DESIGN The full-scale model used in the experimental portion of the study was... designed to represent a typical host-area shelter. It had plan dimensions of 32 feet by 48 feet. Three floor plans were used within the same exterior...11-12 III. EXPERIMENTAL DESIGN . . . . . . . . . . . . . . . . . . . III-1 A. Literature Review . . . . . . . . . . . . . . . . . III

  2. Alteration of Occlusal Plane in Orthognathic Surgery: Clinical Features to Help Treatment Planning on Class III Patients

    PubMed Central

    Costa, Tony Eduardo; Barbosa, Saulo de Matos; Pereira, Rodrigo Alvitos; Chaves Netto, Henrique Duque de Miranda

    2018-01-01

    Dentofacial deformities (DFD) presenting mainly as Class III malocclusions that require orthognathic surgery as a part of definitive treatment. Class III patients can have obvious signs such as increasing the chin projection and chin throat length, nasolabial folds, reverse overjet, and lack of upper lip support. However, Class III patients can present different facial patterns depending on the angulation of occlusal plane (OP), and only bite correction does not always lead to the improvement of the facial esthetic. We described two Class III patients with different clinical features and inclination of OP and had undergone different treatment planning based on 6 clinical features: (I) facial type; (II) upper incisor display at rest; (III) dental and gingival display on smile; (IV) soft tissue support; (V) chin projection; and (VI) lower lip projection. These patients were submitted to orthognathic surgery with different treatment plannings: a clockwise rotation and counterclockwise rotation of OP according to their facial features. The clinical features and OP inclination helped to define treatment planning by clockwise and counterclockwise rotations of the maxillomandibular complex, and two patients undergone to bimaxillary orthognathic surgery showed harmonic outcomes and stables after 2 years of follow-up. PMID:29854480

  3. 76 FR 77982 - Applications for Eligibility Designation; Programs Under Parts A and F of Title III of the Higher...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-15

    ... Title III of the Higher Education Act of 1965, as Amended (HEA), and Programs Under Title V of the HEA...: Programs authorized under Part A, Title III of the HEA: Strengthening Institutions Program (Part A SIP... AANAPISI). Programs authorized under Part F, Title III of the HEA: Hispanic- Serving Institutions Stem and...

  4. 77 FR 67805 - Applications for Eligibility Designation; Programs Under Parts A and F of Title III of the Higher...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-14

    ... Title III of the Higher Education Act of 1965, as Amended (HEA), and Programs Under Title V of the HEA...: Programs authorized under Part A, Title III of the HEA: Strengthening Institutions Program (Part A SIP...). Programs authorized under Part F, Title III of the HEA: Hispanic- Serving Institutions STEM and...

  5. Proceedings of the International Symposium on the Dynamics and Structures of Terrorist Threats in Southeast Asia, Held at Kuala Lumpur, Malaysia

    DTIC Science & Technology

    2005-09-01

    Radicalization ............................ III-55 The Rise of Radical Political Islam in Southeast Asia: A Malaysian Perspective...the already stretched US component. In addition to plans to hit a US warship off the Malaysian waters, Tawfiq bin Attash alias Khallad, the deputy... Malaysian Army Captain and a US-trained biochemist was also the head of Al Qaeda’s Anthrax Program in Kandahar in Afghanistan.8 Zacarias Moussaoui

  6. [Analysis of optimal plan of multiple acupuncture manipulations for shoulder pain after stroke at different stages].

    PubMed

    Chen, Dachun; Gao, Jianyu; Chen, Lu; Hao, Zhuanzhuan; Fan, Gangqi

    2015-12-01

    To observe the effects between acupuncture combined with rehabilitation and simple rehabilitation for shoulder pain after stroke, and to select the best plan of acupuncture manipulations at different stages by orthogonal design. Ninety patients were treated with comprehensive rehabilitation, and nine cases without acupuncture were arranged into a control group. Eighty-one patients of orthogonal design were applied by acupuncture with the same acupoints and course. The VAS score and its weighted value were regarded as the observation indices,and the effects between the acupuncture group and the control group were compared. The optimal plans of acupuncture manipulations of the early stage and the later stage were chosen after the first course treatment and the third course treatment separately. The acupuncture depth (factor A:A: shallow depth less than 25 mm, A(II): modest depth 25-40 mm, A(III): deep depth 40-50 mm), the acupuncture angle (factor B:B(I): perpendicular insertion, B(II): horizontal insertion, B(III): oblique insertion), needle manipulated frequency (factor C: C(I): zero time, C(II): one time, C(III): three times) and needle retained time(factor D:D(I):20 min, D(II): 30 min, D(III): 60 min) were studied. The differences among all factors and the diversity among major factors at different stages were analyzed. (1) Acupuncture combined with rehabilitation at the early and the later stage acquired better improvement than simple rehabilitation (all P < 0.01). (2) The optimal acupuncture manipulation plan at the early stage was A(III) B(III) C(I) D(I), which was deep acupuncture and oblique insertion for 20 min with zero-time manipulation; the optimal acupuncture manipulation plan at the later stage was A(III) B(III) C(III) D(I), which was deep acupuncture and oblique insertion for 20 min with three-time manipulation. (3) There was significance for acupuncture depth and angle at the early stage (both P < 0.01) and there was significance for insertion depth, acupuncture angle and manipulating frequency at the later stage (all P < 0.05). (4) At the early stage, the insertion depth was statistically significant between A(I) and A(II), A(I) and A(III), A(II) and A(III) (P < 0.05, P < 0.01), and the statistical significance was existed between B(I) and B(III) (P < 0.01). At the later stage, the insertion depth was statistically significant between A(I) and A(III), A(III) and A(II), A(I) and A(II) (P < 0.05, P < 0.01), and the statistical significance was existed between C(I) and C(III), C(II) and C(III) (P < 0.05). Acupuncture combined with rehabilitation acquire apparent effect for shoulder pain after stroke. At the early stage,the optimal plan is deep and oblique insertion for 20 min with zero-time manipulation. At the later stage, the best plan is deep and oblique insertion for 20 min with 3-time manipulation.

  7. Phase III Early Restoration Meeting - Lake Charles, LA | NOAA Gulf Spill

    Science.gov Websites

    Areas Alabama Florida Louisiana Mississippi Texas Region-wide Open Ocean Data Media & News early restoration planning for Phase III and future early restoration plans. Open House: 5:30pm Public

  8. Biological Modeling Based Outcome Analysis (BMOA) in 3D Conformal Radiation Therapy (3DCRT) Treatments for Lung and Breast Cancers

    NASA Astrophysics Data System (ADS)

    Pyakuryal, Anil; Chen, Chiu-Hao; Dhungana, Sudarshan

    2010-03-01

    3DCRT treatments are the most commonly used techniques in the treatment of lung and breast cancers. The purpose of this study was to perform the BMOA of the 3DCRT plans designed for the treatment of breast and lung cancers utilizing HART program (Med. Phys. 36, p.2547(2009)). The BMOA parameters include normal tissue complication probability (NTCP), tumor control probability (TCP), and the complication-free tumor control probability (P+). The 3DCRT plans were designed for (i) the palliative treatment of 8 left lung cancer patients (CPs) at early stage (m=8), (ii) the curative treatment of 8 left lung CPs at stages II and III (k=8), and (iii) the curative treatment of 8 left breast CPs (n=8). The NTCPs were noticeably small (<2%) for heart, lungs and cord in both types of treatments except for the esophagus in lung CPs (k=8). Assessments of the TCPs and P+s also indicated good improvements in local tumor control in all plans. Homogeneous target coverage and improved dose conformality were the major advantages of such techniques in the treatment of breast cancer. These achievements support the efficacy of the 3DCRT techniques for the efficient treatment of various types of cancer.

  9. Phase III Early Restoration Meeting - Galveston, TX | NOAA Gulf Spill

    Science.gov Websites

    Areas Alabama Florida Louisiana Mississippi Texas Region-wide Open Ocean Data Media & News planning for Phase III and future early restoration plans. Open House: 6:00pm Public Meeting: 6:30pm

  10. Phase III Early Restoration Meeting - Port Arthur, TX | NOAA Gulf Spill

    Science.gov Websites

    Areas Alabama Florida Louisiana Mississippi Texas Region-wide Open Ocean Data Media & News planning for Phase III and future early restoration plans. Open House: 6:00pm Public Meeting: 6:30pm

  11. Phase III Early Restoration Meeting - Panama City, FL | NOAA Gulf Spill

    Science.gov Websites

    Areas Alabama Florida Louisiana Mississippi Texas Region-wide Open Ocean Data Media & News planning for Phase III and future early restoration plans. Open House: 6:00pm Public Meeting: 6:30pm

  12. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1990.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1990-01-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operationmore » of hydroelectric generation in the Columbia River Basin. This document presents BPA's plans for implementing the Program during Fiscal Year (FY) 1990. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge progress and the success of Program implementation. The FY 1990 AIWP also follows the outline developed by the Policy Review Group (PRG) during Step 1 of initial cycle of the Implementation Planning Process (IPP), which is described in Section III. A number of new FY 1990 projects were still under review by the PRG as the AIWP went to press. These projects have been noted in Table 2, New FY 1990 Program Projects, and in the text of the AIWP. This AIWP has been organized and written to meet the specific needs of Program Action Items 10.1-10.3. The AIWP includes schedules with key milestones for FY 1990 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program. All BPA-funded Program projects discussed in the FY 1990 AIWP are listed in Tables 1 and 2 according to their status as of September 30, 1989. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-18) lists all projects which BPA plans to fund as ''new'' projects in FY 1990. ''Ongoing'' status indicates that the project started in FY 1989 or before, and that it is expected to continue in FY 1990. ''Deferred'' means that BPA implementation has been postponed to FY 1991 or later. ''Completed'' indicates completion during FY 1989. ''New'' denotes projects that BPA plans to start in FY 1990. One new FY 1990 project was included in the draft FY 1990 AIWP as a ''conditional'' project, as a result of PRG recommendations at the May 25, 1989, PRG meeting. If specified conditions are met, BPA will begin to implement the project in FY 1990. Section VII describes BPA's non-Program, internal support projects. These projects were not subject to review by the PRG and have been included in the AIWP to help the PRG and the public to better understand what BPA is doing.« less

  13. Social Work Education. Report of Master Plan Committee S.

    ERIC Educational Resources Information Center

    Illinois State Board of Higher Education, Springfield. Master Plan Committee.

    This report of the Master Plan Committee on Social Work Education is part of Phase III of the Illinois Statewide Master Plan for Higher Education dealing with graduate and professional education. Part I presents an overview. Part II gives a brief description of social work and a statement of the problem. In Part III the social work manpower in the…

  14. Integrating a Career Planning and Development Program into the Baccalaureate Nursing Curriculum: Part III. Impact on Faculty's Career Satisfaction and Confidence in Providing Student Career Coaching.

    PubMed

    Waddell, Janice; Spalding, Karen; Navarro, Justine; Gaitana, Gianina

    2015-11-25

    As career satisfaction has been identified as a predictor of retention of nurses across all sectors, it is important that career satisfaction of both new and experienced nursing faculty is recognized in academic settings. A study of a curriculum-based career planning and development (CPD) program was conducted to determine the program's effects on participating students, new graduate nurses, and faculty. This third in a series of three papers reports on how the CPD intervention affected faculty participants' sense of career satisfaction and confidence in their role as career educators and coaches. Faculty who participated in the intervention CPD intervention group reported an increase in confidence in their ability to provide career coaching and education to students. They further indicated that their own career development served to enhance career satisfaction; an outcome identified as a predictor of faculty career satisfaction. Study results suggest that interventions such as the one described in this paper can have a potentially positive impact in other settings as well.

  15. Proceedings of the Communications Network Management Workshop (1987) Held in Syracuse, New York on 30 June-2 July 1987.

    DTIC Science & Technology

    1987-11-01

    Cmnicatins Ini Europe 4 Ow a’.e 5 00-wm 6 m.,ow 6 C~ "mow6 2 August :982 SBIA F196Z8-82-C-OMal Walter - C. Ki’age U-3 0.~ Israel l P W onio... W -TR-8?-231 F/O 25/4 lillilll Jll. Ln 28 5 B10105 2,2 11111_!.2 1 0i4 1.6 I’ll’’’ IiI t MORO(*1 PRESOLUTION 1E IT (’H NVO, N jR ~ A STNLAPD i963 Ja dK...THE COMMANDER: 1 14. JAMES W . HYDE, III Directorate of Plans & Programs If your address has changed or if you wish to be removed from the RADC

  16. Supercritical Wing Technology: A Progress Report on Flight Evaluations

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The papers in this compilation were presented at the NASA Symposium on "Supercritical Wing Technology: A Progress Report on Flight Evaluation" held at the NASA Flight Research Center, Edwards, Calif., on February 29, 1972. The purpose of the symposium was to present timely information on flight results obtained with the F-8 and T-2C supercritical wing configurations, discuss comparisons with wind-tunnel predictions, and project [ ] flight programs planned for the F-8 and F-III (TACT) airplanes.

  17. The Higher Education Act and Minority Serving Institutions: Towards a Typology of Title III and V Funded Programs

    ERIC Educational Resources Information Center

    Boland, William Casey

    2018-01-01

    To date, there has been little analysis of MSI Title III and V grant-funded programs across all MSI categories. For researchers, practitioners, and policymakers, it is imperative to explore the contributions of MSIs as manifested in Title III and V grant-funded programs. The purpose of this study is to analyze MSI Title III and V programs based on…

  18. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for Fiscal Year 1991.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    United States. Bonneville Power Administration; Northwest Power Planning Council; Columbia Basin Fish and Wildlife Authority

    1990-09-01

    The Columbia River Basin Fish and Wildlife Program (Program) was developed by the Northwest Power Planning Council (Council) in accordance with Public Law 96-501, the Pacific Northwest Electric Power Planning and Conservation Act (Act). The purpose of the Program is to guide the Bonneville Power Administration (BPA) and other Federal agencies in carrying out their responsibilities to protect, mitigate, and enhance fish and wildlife of the Columbia River Basin. The Act explicitly gives BPA the authority and responsibility to use the BPA fund for these ends, to the extent that fish and wildlife are affected by the development and operationmore » of hydroelectric generation in the Columbia River Basin. The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) presents BPA's draft plans for implementing the Program during Fiscal Year (FY) 1991. The AIWP reflects the primary goals of the Council's Action Plan (Section 1400 of the Program): to provide a solid, timely, and focused basis for budgeting and planning. In addition, the AIWP provides a means to judge the progress and the success of Program implementation. The AIWP is based on the outline developed by the Policy Review Group (PRG) during Step 1 of the annual cycle of the Implementation Planning Process (IPP), which is described in Section III. This AIWP has been organized and written to meet the specific needs of Program Items 10.1-10.3. The AIWP includes schedules with key milestones for 1 and beyond, and addresses the Action Items assigned to BPA in Section 1400 of the 1987 Program and in subsequent amendments. All Program projects discussed in the AIWP are listed in Tables 1 and 2 according to their status as of September 1, 1990. Table 1 (pp. 3-14) lists completed, ongoing, and deferred projects. Table 2 (pp. 15-17) lists FY 1991 new-start projects. ''Ongoing'' status indicates that the project started in FY 1990 or before and that it is expected to continue through part or all of FY 1991. ''Deferred'' means that BPA implementation has been postponed to FY 1992 or later. ''Completed'' indicates completion during FY 1990. ''New'' denotes projects planned for BPA implementation in FY 1991. However, several of these new projects were still under review by the Policy Review Group as the FY 1991 AIWP went to press. The new projects still under review have been noted in Table 2 and in the text of the AIWP. A number of projects are expected to begin in late FY 1990 and have been listed in Table 1 of the Draft AIWP as ''Projected FY '90 Starts,'' based on their projected start dates. Several other projects are expected to end in late FY 1990. These projects have been listed in Table 1 as ''Projected FY '90 Completions,'' based on their projected completion dates. Section VIII describes BPA's non-Program, internal support projects. These projects were not subject to review by the PRG and have been included in the AIWP to help the PRG and the public to better understand what BPA is doing.« less

  19. SU-F-T-356: DosimetricComparison of VMAT Vs Step and Shoot IMRT Plans for Stage III Lung CancerPatients with Mediastinal Involvement

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pearson, D; Bogue, J

    Purpose: For Stage III lung cancers that entail treatment of some or all of the mediastinum, anterior-posterior focused Step and Shoot IMRT (SS-IMRT) and VMAT plans have been clinically used to deliver the prescribed dose while working to minimize lung dose and avoid other critical structures. A comparison between the two planning methods was completed to see which treatment method is superior and minimizes dose to healthy lung tissue. Methods: Ten patients who were recently treated with SS-IMRT or VMAT plans for Stage III lung cancer with mediastinal involvement were selected. All patients received a simulation CT for treatment planning,more » as well as a 4D CT and PET/CT fusion for target delineation. Plans were prescribed 6250 cGy in 25 fractions and normalized such that 100% of the prescription dose covered 95% of the PTV. Clinically approved SS-IMRT or VMAT plans were then copied and planned using the alternative modality with identical optimization criteria. SS-IMRT plans utilized seven to nine beams distributed around the patient while the VMAT plans consisted of two full 360 degree arcs. Plans were compared for the lung volume receiving 20 Gy (V20). Results: Both SS-IMRT and VMAT can be used to achieve clinical treatment plans for patients with Stage III Lung cancer with targets encompassing the mediastinum. VMAT plans produced an average V20 of 23.0+/−8.3% and SS-IMRT produced an average of 24.2+/−10.0%. Conclusion: Results indicate that either method can achieve comparable dose distributions, however, VMAT can allow the optimizer to distribute dose over paths of minimal lung tissue and reduce the V20. Therefore, creating a VMAT with constraints identical to an SS-IMRT plan could help to reduce the V20 in clinical treatment plans.« less

  20. Planning and Problem Solving

    DTIC Science & Technology

    1982-10-01

    Artificial Intelig ~ence (Vol. III, edited by Paul R. Cohen and’ Edward A.. Feigenbaum)’, The chapter was written B’ Paul Cohen, with contributions... Artificial Intelligence (Vol. III, edited by Paul R. Cohen and EdWard A. Feigenbaum). The chapter was written by Paul R. Cohen, with contributions by Stephen...Wheevoats"EntermdI’ Planning and Problem ’Solving by Paul R. Cohen Chaptb-rXV-of Volumec III’of the Handbook of Artificial Intelligence edited by Paul R

  1. Grant Administration Manual for Title III Coordinators.

    ERIC Educational Resources Information Center

    Mathis, Emily Duncan; Ashmore, Frances W.

    Guidelines for coordinators of programs under Title III of the Higher Education Act of 1965 are presented, based on a national survey of Title III program coordinators. The responsibilities of the coordinator and information on administering the Strengthening Developing Institutions Program (SDIP) grant are covered. The program can either be a…

  2. Enhanced Night Visibility Series, Volume XII : Overview of Phase II and Development of Phase III Experimental Plan

    DOT National Transportation Integrated Search

    2005-12-01

    This volume provides an overview of the six studies that compose Phase II of the Enhanced Night Visibility project and the experimental plan for its third and final portion, Phase III. The Phase II studies evaluated up to 12 vision enhancement system...

  3. 12. Dry Dock No. 4. Plan. Subdivision III (Frederic R. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Dry Dock No. 4. Plan. Subdivision III (Frederic R. Harris, Inc., January 10, 1941). In Files of Cushman & Wakefield, Building No. 501, Philadelphia Naval Business Center. - Naval Base Philadelphia-Philadelphia Naval Shipyard, Dry Dock No. 4, Broad Street south of Government Avenue, Philadelphia, Philadelphia County, PA

  4. Hospital Guidelines for Diabetes Management and the Joint Commission-American Diabetes Association Inpatient Diabetes Certification.

    PubMed

    Arnold, Pamela; Scheurer, Danielle; Dake, Andrew W; Hedgpeth, Angela; Hutto, Amy; Colquitt, Caroline; Hermayer, Kathie L

    2016-04-01

    The Joint Commission Advanced Inpatient Diabetes Certification Program is founded on the American Diabetes Association's Clinical Practice Recommendations and is linked to the Joint Commission Standards. Diabetes currently affects 29.1 million people in the USA and another 86 million Americans are estimated to have pre-diabetes. On a daily basis at the Medical University of South Carolina (MUSC) Medical Center, there are approximately 130-150 inpatients with a diagnosis of diabetes. The program encompasses all service lines at MUSC. Some important features of the program include: a program champion or champion team, written blood glucose monitoring protocols, staff education in diabetes management, medical record identification of diabetes, a plan coordinating insulin and meal delivery, plans for treatment of hypoglycemia and hyperglycemia, data collection for incidence of hypoglycemia, and patient education on self-management of diabetes. The major clinical components to develop, implement, and evaluate an inpatient diabetes care program are: I. Program management, II. Delivering or facilitating clinical care, III. Supporting self-management, IV. Clinical information management and V. performance measurement. The standards receive guidance from a Disease-Specific Care Certification Advisory Committee, and the Standards and Survey Procedures Committee of the Joint Commission Board of Commissioners. The Joint Commission-ADA Advanced Inpatient Diabetes Certification represents a clinical program of excellence, improved processes of care, means to enhance contract negotiations with providers, ability to create an environment of teamwork, and heightened communication within the organization. Published by Elsevier Inc.

  5. The Australian Geodetic Observing Program. Current Status and Future Plans

    NASA Astrophysics Data System (ADS)

    Johnston, G.; Dawson, J. H.

    2015-12-01

    Over the last decade, the Australian government has through programs like AuScope, the Asia Pacific Reference Frame (APREF), and the Pacific Sea Level Monitoring (PSLM) Project made a significant contribution to the Global Geodetic Observing Program. In addition to supporting the national research priorities, this contribution is justified by Australia's growing economic dependence on precise positioning to underpin efficient transportation, geospatial data management, and industrial automation (e.g., robotic mining and precision agriculture) and the consequent need for the government to guarantee provision of precise positioning products to the Australian community. It is also well recognised within Australia that there is an opportunity to exploit our near unique position as being one of the few regions in the world to see all new and emerging satellite navigation systems including Galileo (Europe), GPS III (USA), GLONASS (Russia), Beidou (China), QZSS (Japan) and IRNSS (India). It is in this context that the Australian geodetic program will build on earlier efforts and further develop its key geodetic capabilities. This will include the creation of an independent GNSS analysis capability that will enable Australia to contribute to the International GNSS Service (IGS) and an upgrade of key geodetic infrastructure including the national VLBI and GNSS arrays. This presentation will overview the significant geodetic activities undertaken by the Australian government and highlight its future plans.

  6. Verification and Planning Based on Coinductive Logic Programming

    NASA Technical Reports Server (NTRS)

    Bansal, Ajay; Min, Richard; Simon, Luke; Mallya, Ajay; Gupta, Gopal

    2008-01-01

    Coinduction is a powerful technique for reasoning about unfounded sets, unbounded structures, infinite automata, and interactive computations [6]. Where induction corresponds to least fixed point's semantics, coinduction corresponds to greatest fixed point semantics. Recently coinduction has been incorporated into logic programming and an elegant operational semantics developed for it [11, 12]. This operational semantics is the greatest fix point counterpart of SLD resolution (SLD resolution imparts operational semantics to least fix point based computations) and is termed co- SLD resolution. In co-SLD resolution, a predicate goal p( t) succeeds if it unifies with one of its ancestor calls. In addition, rational infinite terms are allowed as arguments of predicates. Infinite terms are represented as solutions to unification equations and the occurs check is omitted during the unification process. Coinductive Logic Programming (Co-LP) and Co-SLD resolution can be used to elegantly perform model checking and planning. A combined SLD and Co-SLD resolution based LP system forms the common basis for planning, scheduling, verification, model checking, and constraint solving [9, 4]. This is achieved by amalgamating SLD resolution, co-SLD resolution, and constraint logic programming [13] in a single logic programming system. Given that parallelism in logic programs can be implicitly exploited [8], complex, compute-intensive applications (planning, scheduling, model checking, etc.) can be executed in parallel on multi-core machines. Parallel execution can result in speed-ups as well as in larger instances of the problems being solved. In the remainder we elaborate on (i) how planning can be elegantly and efficiently performed under real-time constraints, (ii) how real-time systems can be elegantly and efficiently model- checked, as well as (iii) how hybrid systems can be verified in a combined system with both co-SLD and SLD resolution. Implementations of co-SLD resolution as well as preliminary implementations of the planning and verification applications have been developed [4]. Co-LP and Model Checking: The vast majority of properties that are to be verified can be classified into safety properties and liveness properties. It is well known within model checking that safety properties can be verified by reachability analysis, i.e, if a counter-example to the property exists, it can be finitely determined by enumerating all the reachable states of the Kripke structure.

  7. The Military Family: A Selective Bibliography.

    DTIC Science & Technology

    1981-09-01

    1975 K8 iittle. Roger W ., ed. Handbook of Military Instituit ions. Beve rly 1iII s , CA: Sage, 1971. 607 1. UA 10 .1123 l.ittle, Roger W., ed. A...Program Management ." Commanh r.; Digest 18: entire issue, September 11, 1975 "CHAMPUS Complexitis Explained by ROA Sui-gt.n." CO),. Ialrrv G. Becker...lluaiv 1973 ’Missing Pilots’ Chi ldren Rece iv,, VA Schl Aid." Air Iorce ’lit:; l’ 1I, 1971 ’Mission: Financial Planning." (apt. Lvle R. Me tzlor and 2d

  8. [Chronic chondromalacia of the patella: comparison of morphological (magnetic resonance) and functional findings (isokinetic parameters) after rehabilitation].

    PubMed

    Felicetti, G; Avanza, F; Fiori, M; Brignoli, E; Rovescala, R

    1996-01-01

    The knee is a common site for injuries of the cartilage, capsule and ligament, which calls for the use of noninvasive techniques to assess injury severity properly and to plan adequate rehabilitation. Our study was aimed at comparing MR with isokinetic findings. To this purpose, 40 patients were examined; they were all affected with chondromalacia patellae, grades I-III, previously diagnosed at arthroscopy. Namely, 8 patients had grade I and 32 grades II and III chondromalacia. After MR and isokinetic exams, all patients were submitted to a standardized rehabilitation program. Our results indicate a marked decrease in quadriceps strength, especially in the most severe cases; in less severe cases, recovery was complete at 6 months, while the deficit remained in grades II and III injuries. MR yield was not relevant in 4 of 8 cases, while isokinetic findings were negative in one case. Both methods were positive in the most severe cases. At 6 months, both functional and MR findings were normal in grade I injuries, while some alterations remained in the others.

  9. 24 CFR 8.29 - Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self-help programs). 8.29 Section 8.29...), Turnkey III and Indian housing mutual self-help programs). Any housing units newly constructed or...

  10. 24 CFR 8.29 - Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self-help programs). 8.29 Section 8.29...), Turnkey III and Indian housing mutual self-help programs). Any housing units newly constructed or...

  11. 40 CFR 147.650 - State-administrative program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CONTROL PROGRAMS Idaho § 147.650 State-administrative program—Class I, II, III, IV, and V wells. The UIC program for Class I, II, III, IV, and V wells in the State of Idaho, other than those on Indian lands, is the program administered by the Idaho Department of Water Resources, approved by EPA pursuant to...

  12. Plumbing Specialist II & III, 3-22. Military Curriculum Materials for Vocational and Technical Education.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. National Center for Research in Vocational Education.

    These military-developed curriculum materials consist of a course description, course chart, plan of instruction, lesson plans, study guides, and workbooks for use in training plumbing specialists II and III. Covered in the course blocks are building waste systems and exterior and interior supply systems. Course block II, on building waste…

  13. 78 FR 65621 - Implementation of Title I/II Program Initiatives; Extension of Public Comment Period; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... DEPARTMENT OF EDUCATION Implementation of Title I/II Program Initiatives; Extension of Public Comment Period; Correction AGENCY: Department of Education. ACTION: Correction notice. SUMMARY: On October... Title I/II Program Initiatives,'' Docket ID ED- 2013-ICCD-0090. The comment period for this information...

  14. 78 FR 41785 - Agency Information Collection Activities; Comment Request; Implementation of Title I/II Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-11

    ...; Comment Request; Implementation of Title I/II Program Initiatives AGENCY: Institute of Educational... note that written comments received in response to this notice will be considered public records. Title of Collection: Implementation of Title I/II Program Initiatives. OMB Control Number: 1850-New. Type...

  15. Failure mode and effects analysis based risk profile assessment for stereotactic radiosurgery programs at three cancer centers in Brazil.

    PubMed

    Teixeira, Flavia C; de Almeida, Carlos E; Saiful Huq, M

    2016-01-01

    The goal of this study was to evaluate the safety and quality management program for stereotactic radiosurgery (SRS) treatment processes at three radiotherapy centers in Brazil by using three industrial engineering tools (1) process mapping, (2) failure modes and effects analysis (FMEA), and (3) fault tree analysis. The recommendations of Task Group 100 of American Association of Physicists in Medicine were followed to apply the three tools described above to create a process tree for SRS procedure for each radiotherapy center and then FMEA was performed. Failure modes were identified for all process steps and values of risk priority number (RPN) were calculated from O, S, and D (RPN = O × S × D) values assigned by a professional team responsible for patient care. The subprocess treatment planning was presented with the highest number of failure modes for all centers. The total number of failure modes were 135, 104, and 131 for centers I, II, and III, respectively. The highest RPN value for each center is as follows: center I (204), center II (372), and center III (370). Failure modes with RPN ≥ 100: center I (22), center II (115), and center III (110). Failure modes characterized by S ≥ 7, represented 68% of the failure modes for center III, 62% for center II, and 45% for center I. Failure modes with RPNs values ≥100 and S ≥ 7, D ≥ 5, and O ≥ 5 were considered as high priority in this study. The results of the present study show that the safety risk profiles for the same stereotactic radiotherapy process are different at three radiotherapy centers in Brazil. Although this is the same treatment process, this present study showed that the risk priority is different and it will lead to implementation of different safety interventions among the centers. Therefore, the current practice of applying universal device-centric QA is not adequate to address all possible failures in clinical processes at different radiotherapy centers. Integrated approaches to device-centric and process specific quality management program specific to each radiotherapy center are the key to a safe quality management program.

  16. Coeur d'Alene Tribal Production Facility, Volume I of III, 2002-2003 Progress Report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anders, Paul

    2003-01-01

    In fulfillment of the NWPPC's 3-Step Process for the implementation of new hatcheries in the Columbia Basin, this Step 1 submission package to the Council includes four items: (1) Cover letter from the Coeur d'Alene Tribe, Interdisciplinary Team Chair, and the USFWS; (2) References to key information (Attachments 1-4); (3) The updated Master Plan for the Tribe's native cutthroat restoration project; and (4) Appendices. In support of the Master Plan submitted by the Coeur d'Alene Tribe the reference chart (Item 2) was developed to allow reviewers to quickly access information necessary for accurate peer review. The Northwest Power Planning Councilmore » identified pertinent issues to be addressed in the master planning process for new artificial production facilities. References to this key information are provided in three attachments: (1) NWPPC Program language regarding the Master Planning Process, (2) Questions Identified in the September 1997 Council Policy, and (3) Program language identified by the Council's Independent Scientific Review Panel (ISRP). To meet the need for off-site mitigation for fish losses on the mainstem Columbia River, in a manner consistent with the objectives of the Council's Program, the Coeur d'Alene Tribe is proposing that the BPA fund the design, construction, operation, and maintenance of a trout production facility located adjacent to Coeur d'Alene Lake on the Coeur d'Alene Indian Reservation. The updated Master Plan (Item 3) represents the needs associated with the re-evaluation of the Coeur d'Alene Tribe's Trout Production Facility (No.199004402). This plan addresses issues and concerns expressed by the NWPPC as part of the issue summary for the Mountain Columbia provincial review, and the 3-step hatchery review process. Finally, item 4 (Appendices) documents the 3-Step process correspondence to date between the Coeur d'Alene Tribe and additional relevant entities. Item 4 provides a chronological account of previous ISRP reviews, official Coeur d'Alene fisheries program responses to a series of ISRP reviews, master planning documentation, and annual reports dating back to 1990. Collectively, the materials provided by the Coeur d'Alene Tribe in this Step-1 submission package comprehensively assesses key research, habitat improvement activities, and hatchery production issues to best protect and enhance native cutthroat trout populations and the historically and culturally important tribal fisheries they support.« less

  17. Apollo Video Photogrammetry Estimation of Plume Impingement Effects

    NASA Technical Reports Server (NTRS)

    Immer, Christopher; Lane, John; Metzger, Philip; Clements, Sandra

    2008-01-01

    Each of the six Apollo mission landers touched down at unique sites on the lunar surface. Aside from the Apollo 12 landing site located 180 meters from the Surveyor III lander, plume impingement effects on ground hardware during the landings were largely not an issue. The Constellation Project's planned return to the moon requires numerous landings at the same site. Since the top few centimeters are loosely packed regolith, plume impingement from the lander ejects the granular material at high velocities. With high vacuum conditions on the moon (10 (exp -14) to 10 (epx -12) torr), motion of all particles is completely ballistic. Estimates from damage to the Surveyor III show that the ejected regolith particles to be anywhere 400 m/s to 2500 m/s. It is imperative to understand the physics of plume impingement to safely design landing sites for the Constellation Program.

  18. Evaluating remedial alternatives for an acid mine drainage stream: Application of a reactive transport model

    USGS Publications Warehouse

    Runkel, R.L.; Kimball, B.A.

    2002-01-01

    A reactive transport model based on one-dimensional transport and equilibrium chemistry is applied to synoptic data from an acid mine drainage stream. Model inputs include streamflow estimates based on tracer dilution, inflow chemistry based on synoptic sampling, and equilibrium constants describing acid/base, complexation, precipitation/dissolution, and sorption reactions. The dominant features of observed spatial profiles in pH and metal concentration are reproduced along the 3.5-km study reach by simulating the precipitation of Fe(III) and Al solid phases and the sorption of Cu, As, and Pb onto freshly precipitated iron-(III) oxides. Given this quantitative description of existing conditions, additional simulations are conducted to estimate the streamwater quality that could result from two hypothetical remediation plans. Both remediation plans involve the addition of CaCO3 to raise the pH of a small, acidic inflow from ???2.4 to ???7.0. This pH increase results in a reduced metal load that is routed downstream by the reactive transport model, thereby providing an estimate of post-remediation water quality. The first remediation plan assumes a closed system wherein inflow Fe(II) is not oxidized by the treatment system; under the second remediation plan, an open system is assumed, and Fe(II) is oxidized within the treatment system. Both plans increase instream pH and substantially reduce total and dissolved concentrations of Al, As, Cu, and Fe(II+III) at the terminus of the study reach. Dissolved Pb concentrations are reduced by ???18% under the first remediation plan due to sorption onto iron-(III) oxides within the treatment system and stream channel. In contrast, iron(III) oxides are limiting under the second remediation plan, and removal of dissolved Pb occurs primarily within the treatment system. This limitation results in an increase in dissolved Pb concentrations over existing conditions as additional downstream sources of Pb are not attenuated by sorption.

  19. Phase III Early Restoration Public Meetings | NOAA Gulf Spill Restoration

    Science.gov Websites

    Archive Home Phase III Early Restoration Public Meetings Phase III Early Restoration Public Meetings share Posted on December 6, 2013 | Assessment and Early Restoration Restoration Area Title: Phase III Early on the draft plan for the third phase of Early Restoration, which proposes more than $625 million in

  20. Design for effective development and prototyping of the HL-20

    NASA Astrophysics Data System (ADS)

    Urie, David M.; Floreck, Paul A.; McMorris, John A.; Elvin, John D.

    1993-10-01

    A feasibility study of the HL-20 personnel launch system (PLS) concept was conducted by a team which focused on creating a PLS design approach and an accelerated development plan consistent with the historical 'Skunk Works' approach to rapid prototyping. Technical design, manufacturing, system testing, and operations and support elements of the predefined baseline concept were evaluated. An initial phase program, featuring a concurrent system test during design and development, leading to the orbital flight of an unmanned HL-20 prototype on a Titan III launch system, was prescribed. A second-phase development and manufacturing plan leading to system operational status was also formulated. Baseline design feature modifications were made when necessary, without compromise to performance, to satisfy the prototype development plan. Technical design details and off-the-shelf hardware candidates were also identified for several subsystems, including the launch-system interface adapter/emergency escape system. The technical feasibility of the system and applicability of the Skunk Works approach to development of the HL-20/PLS were verified.

  1. Development Roadmap of an Evolvable and Extensible Multi-Mission Telecom Planning and Analysis Framework

    NASA Technical Reports Server (NTRS)

    Cheung, Kar-Ming; Tung, Ramona H.; Lee, Charles H.

    2003-01-01

    In this paper, we describe the development roadmap and discuss the various challenges of an evolvable and extensible multi-mission telecom planning and analysis framework. Our long-term goal is to develop a set of powerful flexible telecommunications analysis tools that can be easily adapted to different missions while maintain the common Deep Space Communication requirements. The ability of re-using the DSN ground models and the common software utilities in our adaptations has contributed significantly to our development efforts measured in terms of consistency, accuracy, and minimal effort redundancy, which can translate into shorter development time and major cost savings for the individual missions. In our roadmap, we will address the design principles, technical achievements and the associated challenges for following telecom analysis tools (i) Telecom Forecaster Predictor - TFP (ii) Unified Telecom Predictor - UTP (iii) Generalized Telecom Predictor - GTP (iv) Generic TFP (v) Web-based TFP (vi) Application Program Interface - API (vii) Mars Relay Network Planning Tool - MRNPT.

  2. Category (CAT) IIIb Level 1 Test Plan for Global Positioning System (GPS)

    DTIC Science & Technology

    1993-09-01

    applications. CAT 11Tb is defined in Advisory Circular ( AC ) 120-28C [1] as "a precision instrument approach and landing with no decision height (DH), or...2) FAA AC 20-57A (Automatic Landing Systems) [31, AC 120-28C (Criteria for Approval of CAT III Landing Weather Minima) [I] and the FAA tunnel-in...AD-A274 098I I~II l~iiUIRII 11111ilIII2 DOT/FAA/RD-93/21 Category ( CAT ) IIb Level 1 MTR 93W0000102 Research and Test Plan for Global Development

  3. Integrating an HTLV-III Screening Program into a Community Based Family Health Service Agency.

    ERIC Educational Resources Information Center

    Klausmeier, Walter W.; Henshaw, Beverly

    Acquired Immune Deficiency Syndrome (AIDS) has become one of the most serious epidemic disease problems in recent years. In 1985 the Public Health Service recommended establishment of test sites where individuals might be tested for Human T Lymphotropic Virus III (HTLV-III) antibody. An HTLV-III antibody screening program was integrated into a…

  4. Louisiana SIP: LAC 33:III Ch. 14 Subchap A, 1401 to 1415--Determining Conformity of General Federal Actions to State or Federal Implementation Plans; SIP effective 1996-11-12 (LAc67) and 1998-05-08 (LAc75)

    EPA Pesticide Factsheets

    Louisiana SIP: LAC 33:III Ch. 14 Subchap A, 1401 to 1415--Determining Conformity of General Federal Actions to State or Federal Implementation Plans; SIP effective 1996-11-12 (LAc67) and 1998-05-08 (LAc75)

  5. Options: A Career Development Curriculum for Rural High School Students. Unit III, Life Planning [and] Game of Life: Choice and Chance.

    ERIC Educational Resources Information Center

    Dunne, Faith; And Others

    Designed to last approximately 12 days, Unit III of the 4-unit life planning and career development curriculum for rural high school students focuses on skills application. Through experience simulation, students apply skills learned in Unit II to the information from Unit I; they project their future lives and simulate their responses to problems…

  6. 40 CFR 52.1771 - Classification of regions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 4 2013-07-01 2013-07-01 false Classification of regions. 52.1771 Section 52.1771 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... III III III III Eastern Piedmont Intrastate I III III III III Northern Coastal Intrastate I III III...

  7. 40 CFR 52.1771 - Classification of regions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 4 2014-07-01 2014-07-01 false Classification of regions. 52.1771 Section 52.1771 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... III III III III Eastern Piedmont Intrastate I III III III III Northern Coastal Intrastate I III III...

  8. 40 CFR 52.1771 - Classification of regions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Classification of regions. 52.1771 Section 52.1771 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... III III III III Eastern Piedmont Intrastate I III III III III Northern Coastal Intrastate I III III...

  9. 40 CFR 52.1771 - Classification of regions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Classification of regions. 52.1771 Section 52.1771 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... III III III III Eastern Piedmont Intrastate I III III III III Northern Coastal Intrastate I III III...

  10. 40 CFR 52.1771 - Classification of regions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 4 2012-07-01 2012-07-01 false Classification of regions. 52.1771 Section 52.1771 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... III III III III Eastern Piedmont Intrastate I III III III III Northern Coastal Intrastate I III III...

  11. Lunar Contour Crafting: A Novel Technique for ISRU-Based Habitat Development

    NASA Technical Reports Server (NTRS)

    Khoshnevis, Behrokh; Bodiford, Melanie P.; Burks, Kevin H.; Ethridge, Ed; Tucker, Dennis; Kim, Won; Toutanji, Houssam; Fiske, Michael R.

    2005-01-01

    1. Habitat Structures at MSFC is one element of the In-Situ Fabrication and Repair (ISFR) Program: ISFR develops technologies for fabrication, repair and recycling of tools, parts, and habitats/structures using in-situ resources. ISRU - based habitat structures are considered Class III. 2. Habitat Structure Purpose: Develop Lunar and/or Martian habitat structures for manned missions that maximize the use of in-situ resources to address the following agency topics: bioastronautics critical path roadmap; strategic technical challenges defined in H&RT formulation plan: margins and redundancy; modularity, robotic network, space resource utilization; autonomy, affordable logistics pre-positioning.

  12. Fitting Community Based Newborn Care Package into the health systems of Nepal.

    PubMed

    Pradhan, Y V; Upreti, S R; Kc, N P; Thapa, K; Shrestha, P R; Shedain, P R; Dhakwa, J R; Aryal, D R; Aryal, S; Paudel, D C; Paudel, D; Khanal, S; Bhandari, A; Kc, A

    2011-10-01

    Community-based strategies for delivering effective newborn interventions are an essential step to avert newborn death, in settings where the health facilities are unable to effectively deliver the interventions and reach their population. Effective implementation of community-based interventions as a large scale program and within the existing health system depends on the appropriate design and planning, monitoring and support systems. This article provides an overview of implementation design of Community-Based Newborn Care Package (CB-NCP) program, its setup within the health system, and early results of the implementation from one of the pilot districts. The evaluation of CB-NCP in one of the pilot districts shows significant improvement in antenatal, intrapartum and post natal care. The implementation design of the CB-NCP has six different health system management functions: i) district planning and orientation, ii) training/human resource development, iii) monitoring and evaluation, iv) logistics and supply chain management, v) communication strategy, and vi) pay for performance. The CB-NCP program embraced the existing system of monitoring with some additional components for the pilot phase to test implementation feasibility, and aligns with existing safe motherhood and child health programs. Though CB-NCP interventions are proven independently in different local and global contexts, they are piloted in 10 districts as a "package" within the national health system settings of Nepal.

  13. The Glen Canyon Dam adaptive management program: progress and immediate challenges

    USGS Publications Warehouse

    Hamill, John F.; Melis, Theodore S.; Boon, Philip J.; Raven, Paul J.

    2012-01-01

    Adaptive management emerged as an important resource management strategy for major river systems in the United States (US) in the early 1990s. The Glen Canyon Dam Adaptive Management Program (‘the Program’) was formally established in 1997 to fulfill a statutory requirement in the 1992 Grand Canyon Protection Act (GCPA). The GCPA aimed to improve natural resource conditions in the Colorado River corridor in the Glen Canyon National Recreation Area and Grand Canyon National Park, Arizona that were affected by the Glen Canyon dam. The Program achieves this by using science and a variety of stakeholder perspectives to inform decisions about dam operations. Since the Program started the ecosystem is now much better understood and several biological and physical improvements have been achieved. These improvements include: (i) an estimated 50% increase in the adult population of endangered humpback chub (Gila cypha) between 2001 and 2008, following previous decline; (ii) a 90% decrease in non-native rainbow trout (Oncorhynchus mykiss), which are known to compete with and prey on native fish, as a result of removal experiments; and (iii) the widespread reappearance of sandbars in response to an experimental high-flow release of dam water in March 2008.Although substantial progress has been made, the Program faces several immediate challenges. These include: (i) defining specific, measurable objectives and desired future conditions for important natural, cultural and recreational attributes to inform science and management decisions; (ii) implementing structural and operational changes to improve collaboration among stakeholders; (iii) establishing a long-term experimental programme and management plan; and (iv) securing long-term funding for monitoring programmes to assess ecosystem and other responses to management actions. Addressing these challenges and building on recent progress will require strong and consistent leadership from the US Department of the Interior officials who guide the Program.

  14. Gender differences in manifestations of antisocial personality disorder among residential drug abuse treatment clients.

    PubMed

    Goldstein, R B; Powers, S I; McCusker, J; Mundt, K A; Lewis, B F; Bigelow, C

    1996-05-01

    We examined gender differences in manifestations of DSM-III-R antisocial personality disorder in 106 male and 34 female drug abusers enrolled in residential relapse prevention/health education treatment. In childhood, compared to males, females had more often run away but less often used weapons in fights, been cruel to animals, and set fires. Females also reported less vandalism. In adulthood, women had more often been irresponsible as parents and in financial matters, engaged in prostitution, made money finding customers for prostitutes, been physically violent against sex partners and children, failed to plan ahead, and lacked remorse. Our findings suggest that addiction treatment programs need to consider gender differences in antisocial symptomatology in the development of individualized treatment programs for both male and female clients.

  15. 29 CFR 4041.31 - Notice of noncompliance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Regulations Relating to Labor (Continued) PENSION BENEFIT GUARANTY CORPORATION PLAN TERMINATIONS TERMINATION... § 4041.23; (ii) The plan administrator failed to issue notices of plan benefits to all affected parties entitled to plan benefits in accordance with § 4041.24; (iii) The plan administrator failed to file the...

  16. 55. Photograph of Original Plan (original plans in the possession ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    55. Photograph of Original Plan (original plans in the possession of the Los Angeles Union Passenger Terminal Corporation) BAGGAGE AND EXPRESS UNITY, STREET LEVEL FLOOR PLAN, SECTION III - Los Angeles Union Passenger Terminal, Tracks & Shed, 800 North Alameda Street, Los Angeles, Los Angeles County, CA

  17. Environmental Technology Verification (ETV) Program Case Studies: Demonstrating Program Outcomes, Volume III

    EPA Science Inventory

    This booklet, ETV Program Case Studies: Demonstrating Program Outcomes, Volume III contains two case studies, addressing verified environmental technologies for decentalized wastewater treatment and converting animal waste to energy. Each case study contains a brief description ...

  18. Concept for a Satellite-Based Advanced Air Traffic Management System : Volume 6. Development and Transition Plans.

    DOT National Transportation Integrated Search

    1974-02-01

    The volume presents the plans for implementing the Satellite-Based Advanced Air Traffic Management System (SAATMS) described in Volumes II, III, and IV. Two plans are presented: an RDT&E plan and a transition plan. The RDT&E plan is presented as a se...

  19. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...

  20. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...

  1. 10 CFR 52.79 - Contents of applications; technical information in final safety analysis report.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... B to 10 CFR part 73. (iii) A cyber security plan in accordance with the criteria set forth in § 73..., training and qualification plan, and cyber security plan; and (v) Each applicant who prepares a physical security plan, a safeguards contingency plan, a training and qualification plan, or a cyber security plan...

  2. 7 CFR 1485.15 - Activity plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... participant shall develop a specific activity plan(s) based on its strategic plan and the allocation approval... any changes in strategy from the strategic plan; (iii) A budget for each proposed activity, identifying the source of funds; (iv) Specific goals and benchmarks to be used to measure the effectiveness of...

  3. 76 FR 61291 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Ohio; Determination...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-04

    .... Environmental Protection Agency, Region III, 1650 Arch Street, Philadelphia, Pennsylvania 19103. D. Hand..., U.S. Environmental Protection Agency, Region III, 1650 Arch Street, Philadelphia, Pennsylvania 19103..., Environmental Protection Agency, Region III, 1650 Arch Street, Philadelphia, PA 19103-2023. The telephone number...

  4. Effect of Radiotherapy Planning Complexity on Survival of Elderly Patients With Unresected Localized Lung Cancer

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Park, Chang H.; Bonomi, Marcelo; Cesaretti, Jamie

    2011-11-01

    Purpose: To evaluate whether complex radiotherapy (RT) planning was associated with improved outcomes in a cohort of elderly patients with unresected Stage I-II non-small-cell lung cancer (NSCLC). Methods and Materials: Using the Surveillance, Epidemiology, and End Results registry linked to Medicare claims, we identified 1998 patients aged >65 years with histologically confirmed, unresected stage I-II NSCLC. Patients were classified into an intermediate or complex RT planning group using Medicare physician codes. To address potential selection bias, we used propensity score modeling. Survival of patients who received intermediate and complex simulation was compared using Cox regression models adjusting for propensity scoresmore » and in a stratified and matched analysis according to propensity scores. Results: Overall, 25% of patients received complex RT planning. Complex RT planning was associated with better overall (hazard ratio 0.84; 95% confidence interval, 0.75-0.95) and lung cancer-specific (hazard ratio 0.81; 95% confidence interval, 0.71-0.93) survival after controlling for propensity scores. Similarly, stratified and matched analyses showed better overall and lung cancer-specific survival of patients treated with complex RT planning. Conclusions: The use of complex RT planning is associated with improved survival among elderly patients with unresected Stage I-II NSCLC. These findings should be validated in prospective randomized controlled trials.« less

  5. Aboriginal child and adolescent mental health: a rural worker training model.

    PubMed

    Bartik, Warren; Dixon, Angela; Dart, Katrina

    2007-04-01

    The Third National Mental Health Plan places a strong emphasis on the development of an Aboriginal mental health workforce. This paper documents the establishment, implementation and initial evaluation of the Aboriginal and Torres Strait Islander Child and Adolescent Mental Health Traineeship Program, a partnership initiative involving Hunter New England Area Health Service (HNEAHS), Hunter New England Aboriginal Mental Health (HNEAMH) and the Department of Psychological Medicine at the Children's Hospital at Westmead (CHW), with guidance and input from additional collaborators. The program includes: (i) employment as a child and adolescent mental health worker and professional support and supervision through HNEAHS; (ii) a mentoring program provided through HNEAMH; (iii) formal academic studies in Aboriginal Mental Health; and (iv) a clinical education and supervision program conducted through the Department of Psychological Medicine, CHW. Initial feedback suggests that this is a promising program to train Aboriginal child and adolescent mental health workers. Further evaluation will provide information about its viability and effectiveness in providing an integrated, collaborative child and adolescent mental health service for Aboriginal and Torres Strait Islander children and their families.

  6. 26 CFR 1.5000A-0 - Table of contents.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ...) Required contribution percentage. (i) In general. (ii) Indexing. (iii) Plan year. (3) Individuals eligible...) Applicable dollar amount. (iii) Special applicable dollar amount for individuals under age 18. (iv) Indexing...

  7. 26 CFR 1.401(a)-4 - Optional forms of benefit (before 1994).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... nondiscriminatory group of employees. (iii) Special rule for certain governmental or church plans. Plans described... income taxation under section 501(a), including plans subject to section 403(b)(12)(A)(i) (nonelective...

  8. 26 CFR 1.401(a)-4 - Optional forms of benefit (before 1994).

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... nondiscriminatory group of employees. (iii) Special rule for certain governmental or church plans. Plans described... income taxation under section 501(a), including plans subject to section 403(b)(12)(A)(i) (nonelective...

  9. 26 CFR 1.401(a)-4 - Optional forms of benefit (before 1994).

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... nondiscriminatory group of employees. (iii) Special rule for certain governmental or church plans. Plans described... income taxation under section 501(a), including plans subject to section 403(b)(12)(A)(i) (nonelective...

  10. Big River Reservoir Project - Pawcatuck River and Narragansett Bay Drainage Basins - Water and Related Land Resources Study. Volume III. Appendices H-K.

    DTIC Science & Technology

    1981-07-01

    including a recreation impact analysis, aquatic and terrestrial ecosystems assessment and a fish and wildlife management plan), social and cultural...APPENDIX G - DESIGN AND COST ESTIMATES VOLUME III - APPENDIX H - RECREATION AND NATURAL RESOURCES Section 1 - Recreation Impact Analysis Section 2 - Aquatic... Ecosystem Assessment Section 3 - Terrestrial Ecosystem Assessment Section 4 - Fish and Wildlife Management Plan APPENDIX I - SOCIAL AND CULTURAL

  11. 44. Photograph of a line drawing. 'PLAN LAYOUT OF PART ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    44. Photograph of a line drawing. 'PLAN LAYOUT OF PART III, SECTION 1, EQUIPMENT LAYOUT, BUILDINGS H-1 TO H-10 INCL., GRINDING, MANUFACTURING AREA, PLANT 'B'.' From U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant 8, Parts II, III. (Nashville, TN: Office of the District Engineer, 1944). - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN

  12. Planning, Development, and Change in Bristol Bay: A High School Curriculum. Teacher Guide and Student Text. Unit III: 1991 and Beyond. Unit IV: International Perspective. Revised.

    ERIC Educational Resources Information Center

    Lipka, Jerry; Willer, Cristy

    Written with the broad goal of involving high school students in Bristol Bay, Alaska, in the planning and design of their region's future, this combined teacher guide and student text contains the third and fourth units of a seven-unit curriculum. Unit III covers the terms of the Alaska Native Claims Settlement Act and the complicated issues…

  13. 31. Photograph of a line drawing. 'PLAN LAYOUT OF PART ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. Photograph of a line drawing. 'PLAN LAYOUT OF PART III, SECTION 1, EQUIPMENT LAYOUT, BUILDINGS D-1 TO U-10 INCL., NITRATION, MANUFACTURING AREA, PLANT 'B'.' From U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant B, Parts II, III. (Nashville, TN: Office of the District Engineer, 1944). - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN

  14. 40 CFR 300.210 - Federal contingency plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... response plans of state, local, and non-federal entities, and especially with Title III local emergency... between this annex and non-federal response plans (including those of vessels, facilities, and pipelines... 40 Protection of Environment 28 2014-07-01 2014-07-01 false Federal contingency plans. 300.210...

  15. 40 CFR 300.210 - Federal contingency plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... response plans of state, local, and non-federal entities, and especially with Title III local emergency... between this annex and non-federal response plans (including those of vessels, facilities, and pipelines... 40 Protection of Environment 29 2013-07-01 2013-07-01 false Federal contingency plans. 300.210...

  16. 40 CFR 300.210 - Federal contingency plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... response plans of state, local, and non-federal entities, and especially with Title III local emergency... between this annex and non-federal response plans (including those of vessels, facilities, and pipelines... 40 Protection of Environment 28 2011-07-01 2011-07-01 false Federal contingency plans. 300.210...

  17. 40 CFR 300.210 - Federal contingency plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... response plans of state, local, and non-federal entities, and especially with Title III local emergency... between this annex and non-federal response plans (including those of vessels, facilities, and pipelines... 40 Protection of Environment 29 2012-07-01 2012-07-01 false Federal contingency plans. 300.210...

  18. Environmental Compliance Guide

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1981-02-01

    The Guide is intended to assist Department of Energy personnel by providing information on the NEPA process, the processes of other environmental statutes that bear on the NEPA process, the timing relationships between the NEPA process and these other processes, as well as timing relationships between the NEPA process and the development process for policies, programs, and projects. This information should be helpful not only in formulating environmental compliance plans but also in achieving compliance with NEPA and various other environmental statutes. The Guide is divided into three parts with related appendices: Part I provides guidance for developing environmental compliancemore » plans for DOE actions; Part II is devoted to NEPA with detailed flowcharts depicting the compliance procedures required by CEQ regulations and Department of Energy NEPA Guidelines; and Part III contains a series of flowcharts for other Federal environmental requirements that may apply to DOE projects.« less

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Teixeira, Flavia C., E-mail: flavitiz@gmail.com; Almeida, Carlos E. de; Saiful Huq, M.

    Purpose: The goal of this study was to evaluate the safety and quality management program for stereotactic radiosurgery (SRS) treatment processes at three radiotherapy centers in Brazil by using three industrial engineering tools (1) process mapping, (2) failure modes and effects analysis (FMEA), and (3) fault tree analysis. Methods: The recommendations of Task Group 100 of American Association of Physicists in Medicine were followed to apply the three tools described above to create a process tree for SRS procedure for each radiotherapy center and then FMEA was performed. Failure modes were identified for all process steps and values of riskmore » priority number (RPN) were calculated from O, S, and D (RPN = O × S × D) values assigned by a professional team responsible for patient care. Results: The subprocess treatment planning was presented with the highest number of failure modes for all centers. The total number of failure modes were 135, 104, and 131 for centers I, II, and III, respectively. The highest RPN value for each center is as follows: center I (204), center II (372), and center III (370). Failure modes with RPN ≥ 100: center I (22), center II (115), and center III (110). Failure modes characterized by S ≥ 7, represented 68% of the failure modes for center III, 62% for center II, and 45% for center I. Failure modes with RPNs values ≥100 and S ≥ 7, D ≥ 5, and O ≥ 5 were considered as high priority in this study. Conclusions: The results of the present study show that the safety risk profiles for the same stereotactic radiotherapy process are different at three radiotherapy centers in Brazil. Although this is the same treatment process, this present study showed that the risk priority is different and it will lead to implementation of different safety interventions among the centers. Therefore, the current practice of applying universal device-centric QA is not adequate to address all possible failures in clinical processes at different radiotherapy centers. Integrated approaches to device-centric and process specific quality management program specific to each radiotherapy center are the key to a safe quality management program.« less

  20. Federal Radionavigation Plan. Volume III : Radionavigation System Characteristics

    DOT National Transportation Integrated Search

    1980-07-01

    The Federal Radionavigation Plan (FRP) has been jointly developed by the U.S. Departments of Defense and Transportation to ensure efficient use of resources and full protection of national interests. The plan sets forth the Federal interagency approa...

  1. 30 CFR 254.21 - How must I format my response plan?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... divide your response plan for OCS facilities into the sections specified in paragraph (b) and explained in the other sections of this subpart. The plan must have an easily found marker identifying each.... (ii) Contractual agreements. (iii) Worst case discharge scenario. (iv) Dispersant use plan. (v) In...

  2. Preliminary Shielding Analysis for HCCB TBM Transport

    NASA Astrophysics Data System (ADS)

    Miao, Peng; Zhao, Fengchao; Cao, Qixiang; Zhang, Guoshu; Feng, Kaiming

    2015-09-01

    A preliminary shielding analysis on the transport of the Chinese helium cooled ceramic breeder test blanket module (HCCB TBM) from France back to China after being irradiated in ITER is presented in this contribution. Emphasis was placed on irradiation safety during transport. The dose rate calculated by MCNP/4C for the conceptual package design satisfies the relevant dose limits from IAEA that the dose rate 3 m away from the surface of the package containing low specific activity III materials should be less than 10 mSv/h. The change with location and the time evolution of dose rates after shutdown have also been studied. This will be helpful for devising the detailed transport plan of HCCB TBM back to China in the near future. supported by the Major State Basic Research Development Program of China (973 Program) (No. 2013GB108000)

  3. SERC 2014 2018 Technical Plan: 2016 Update

    DTIC Science & Technology

    2016-02-18

    Contract Number: HQ0034-13-D-0004 February 18, 2016 SERC 2014-2018 Technical Plan Update SERC 2014-2018 Technical Plan: 2016 Update...UNCLASSIFIED / APPROVED FOR PUBLIC RELEASE Contract Number: HQ0034-13-D-0004 February 18, 2016 SERC 2014-2018 Technical Plan Update ii...18, 2016 SERC 2014-2018 Technical Plan Update iii TABLE OF CONTENTS Table of Contents

  4. SUPERSTARS III: 6-8.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Education, Raleigh.

    SUPERSTARS III is a K-8 program designed as an enrichment opportunity for self-directed learners in mathematics. The basic purpose of SUPERSTARS III is to provide the extra challenge that self-motivated students need in mathematics and to do so in a structured, long-term program that does not impinge on the normal classroom routine or the…

  5. SUPERSTARS III: K-2.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Education, Raleigh.

    SUPERSTARS III is a K-8 program designed as an enrichment opportunity for self-directed learners in mathematics. The basic purpose of SUPERSTARS III is to provide the extra challenge that self-motivated students need in mathematics and to do so in a structured, long-term program that does not impinge on the normal classroom routine or the…

  6. SUPERSTARS III: 3-5.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Education, Raleigh.

    SUPERSTARS III is a K-8 program designed as an enrichment opportunity for self-directed learners in mathematics. The basic purpose of SUPERSTARS III is to provide the extra challenge that self-motivated students need in mathematics and to do so in a structured, long-term program that does not impinge on the normal classroom routine or the…

  7. International Space Programs. Aerospace Education III.

    ERIC Educational Resources Information Center

    Bulmer, S. B.

    This book, one in the series on Aerospace Education III, is a collection of the diverse information available regarding the international space programs. The five goals listed for the book are: to examine the Soviet space program, to understand the future of Soviet space activity, to examine other national and international space programs, to…

  8. Federal Radionavigation Plan. Volume III. Radionavigation System Characteristics

    DOT National Transportation Integrated Search

    1982-03-01

    The second edition of the Federal Radionavigation Plan (FRP) has been jointly developed by the U.S. Departments of Defense and Transportation to ensure efficient use of resources and full protection of national interests. The plan sets forth the Fede...

  9. Computer Program (HEVSIM) for Heavy Duty Vehicle Fuel Economy and Performance Simulation. Volume III.

    DOT National Transportation Integrated Search

    1981-09-01

    Volume III is the third and last volume of a three volume document describing the computer program HEVSIM. This volume includes appendices which list the HEVSIM program, sample part data, some typical outputs and updated nomenclature.

  10. Four-phase or two-phase signal plan? A study on four-leg intersection by cellular automaton simulations

    NASA Astrophysics Data System (ADS)

    Jin, Cheng-Jie; Wang, Wei; Jiang, Rui

    2016-08-01

    The proper setting of traffic signals at signalized intersections is one of the most important tasks in traffic control and management. This paper has evaluated the four-phase traffic signal plans at a four-leg intersection via cellular automaton simulations. Each leg consists of three lanes, an exclusive left-turn lane, a through lane, and a through/right-turn lane. For a comparison, we also evaluate the two-phase signal plan. The diagram of the intersection states in the space of inflow rate versus turning ratio has been presented, which exhibits four regions: In region I/II/III, congestion will propagate upstream and laterally and result in queue spillover with both signal plans/two-phase signal plan/four-phase signal plan, respectively. Therefore, neither signal plan works in region I, and only the four-phase signal plan/two-phase signal plan works in region II/III. In region IV, both signal plans work, but two-phase signal plan performs better in terms of average delays of vehicles. Finally, we study the diagram of the intersection states and average delays in the asymmetrical configurations.

  11. Lunar precursor missions for human exploration of Mars--III: studies of system reliability and maintenance.

    PubMed

    Mendell, W W; Heydorn, R P

    2004-01-01

    Discussions of future human expeditions into the solar system generally focus on whether the next explorers ought to go to the Moon or to Mars. The only mission scenario developed in any detail within NASA is an expedition to Mars with a 500-day stay at the surface. The technological capabilities and the operational experience base required for such a mission do not now exist nor has any self-consistent program plan been proposed to acquire them. In particular, the lack of an Abort-to-Earth capability implies that critical mission systems must perform reliably for 3 years or must be maintainable and repairable by the crew. As has been previously argued, a well-planned program of human exploration of the Moon would provide a context within which to develop the appropriate technologies because a lunar expedition incorporates many of the operational elements of a Mars expedition. Initial lunar expeditions can be carried out at scales consistent with the current experience base but can be expanded in any or all operational phases to produce an experience base necessary to successfully and safely conduct human exploration of Mars. Published by Elsevier Ltd.

  12. Lunar precursor missions for human exploration of Mars--III: studies of system reliability and maintenance

    NASA Technical Reports Server (NTRS)

    Mendell, W. W.; Heydorn, R. P.

    2004-01-01

    Discussions of future human expeditions into the solar system generally focus on whether the next explorers ought to go to the Moon or to Mars. The only mission scenario developed in any detail within NASA is an expedition to Mars with a 500-day stay at the surface. The technological capabilities and the operational experience base required for such a mission do not now exist nor has any self-consistent program plan been proposed to acquire them. In particular, the lack of an Abort-to-Earth capability implies that critical mission systems must perform reliably for 3 years or must be maintainable and repairable by the crew. As has been previously argued, a well-planned program of human exploration of the Moon would provide a context within which to develop the appropriate technologies because a lunar expedition incorporates many of the operational elements of a Mars expedition. Initial lunar expeditions can be carried out at scales consistent with the current experience base but can be expanded in any or all operational phases to produce an experience base necessary to successfully and safely conduct human exploration of Mars. Published by Elsevier Ltd.

  13. Apollo 12 Lunar Module exhaust plume impingement on Lunar Surveyor III

    NASA Astrophysics Data System (ADS)

    Immer, Christopher; Metzger, Philip; Hintze, Paul E.; Nick, Andrew; Horan, Ryan

    2011-02-01

    Understanding plume impingement by retrorockets on the surface of the Moon is paramount for safe lunar outpost design in NASA's planned return to the Moon for the Constellation Program. Visual inspection, Scanning Electron Microscopy, and surface scanned topology have been used to investigate the damage to the Lunar Surveyor III spacecraft that was caused by the Apollo 12 Lunar Module's close proximity landing. Two parts of the Surveyor III craft returned by the Apollo 12 astronauts, Coupons 2050 and 2051, which faced the Apollo 12 landing site, show that a fine layer of lunar regolith coated the materials and was subsequently removed by the Apollo 12 Lunar Module landing rocket. The coupons were also pitted by the impact of larger soil particles with an average of 103 pits/cm 2. The average entry size of the pits was 83.7 μm (major diameter) × 74.5 μm (minor diameter) and the average estimated penetration depth was 88.4 μm. Pitting in the surface of the coupons correlates to removal of lunar fines and is likely a signature of lunar material imparting localized momentum/energy sufficient to cause cracking of the paint. Comparison with the lunar soil particle size distribution and the optical density of blowing soil during lunar landings indicates that the Surveyor III spacecraft was not exposed to the direct spray of the landing Lunar Module, but instead experienced only the fringes of the spray of soil. Had Surveyor III been exposed to the direct spray, the damage would have been orders of magnitude higher.

  14. Phase III Archives | NOAA Gulf Spill Restoration

    Science.gov Websites

    III Early Restoration Plan and Draft Early Restoration PEIS Executive Summary (pdf, 3.4 MB) Project Summary Table (pdf, 80 KB) Public Repositories (pdf, 113 KB) Press Release (pdf, 501 KB) Press Release

  15. 26 CFR 1.419A(f)(6)-1 - Exception for 10 or more employer plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... employers; (iii) That does not maintain an experience-rating arrangement with respect to any individual... information. A plan satisfies the requirements of this paragraph (a)(2) if the plan is maintained pursuant to a written document that requires the plan administrator to maintain records sufficient for the...

  16. 26 CFR 1.419A(f)(6)-1 - Exception for 10 or more employer plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... employers; (iii) That does not maintain an experience-rating arrangement with respect to any individual... information. A plan satisfies the requirements of this paragraph (a)(2) if the plan is maintained pursuant to a written document that requires the plan administrator to maintain records sufficient for the...

  17. 140. ARAIII Grading and drainage plan showing plot plan, including ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    140. ARA-III Grading and drainage plan showing plot plan, including berms around waste storage tank and fuel oil storage tank. Aerojet-general 880-area-GCRE-101-1. Date: February 1958. Ineel index code no. 063-0101-00-013-102507. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  18. Early Restoration | NOAA Gulf Spill Restoration

    Science.gov Websites

    Early Restoration Plan. On April 20, 2011 we reached an agreement with BP to start restoration planning draft plan for the third phase of early restoration in December 2013. We are considering your comments : All Phase III information and documents Phase II Useful Links: Phase II Early Restoration Plan &

  19. Improved Virtual Planning for Bimaxillary Orthognathic Surgery.

    PubMed

    Hatamleh, Muhanad; Turner, Catherine; Bhamrah, Gurprit; Mack, Gavin; Osher, Jonas

    2016-09-01

    Conventional model surgery planning for bimaxillary orthognathic surgery can be laborious, time-consuming and may contain potential errors; hence three-dimensional (3D) virtual orthognathic planning has been proven to be an efficient, reliable, and cost-effective alternative. In this report, the 3D planning is described for a patient presenting with a Class III incisor relationship on a Skeletal III base with pan facial asymmetry complicated by reverse overjet and anterior open bite. A combined scan data of direct cone beam computer tomography and indirect dental scan were used in the planning. Additionally, a new method of establishing optimum intercuspation by scanning dental casts in final occlusion and positioning it to the composite-scans model was shown. Furthermore, conventional model surgery planning was carried out following in-house protocol. Intermediate and final intermaxillary splints were produced following the conventional method and 3D printing. Three-dimensional planning showed great accuracy and treatment outcome and reduced laboratory time in comparison with the conventional method. Establishing the final dental occlusion on casts and integrating it in final 3D planning enabled us to achieve the best possible intercuspation.

  20. JumpStart III Final Report.

    ERIC Educational Resources Information Center

    Cohen, Arthur M.; Brawer, Florence B.; Kozeracki, Carol A.

    This final report for the JumpStart III program presents a summary of the entrepreneurship training programs developed by each of the four JumpStart III partners selected in March 1997. Grants for the colleges totaled $354,546 over 2 years. The Jumpstart funding has been only a starting point for these and the other 12 Jumpstart partners in…

  1. 40 CFR 147.2650 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CONTROL PROGRAMS Puerto Rico § 147.2650 State-administered program—Class I, II, III, IV, and V wells. The Underground Injection Control Program for all classes of wells in the Commonwealth of Puerto Rico, other than those on Indian lands, is the program administered by Puerto Rico's Environmental Quality Board (EQB...

  2. 40 CFR 147.2650 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CONTROL PROGRAMS Puerto Rico § 147.2650 State-administered program—Class I, II, III, IV, and V wells. The Underground Injection Control Program for all classes of wells in the Commonwealth of Puerto Rico, other than those on Indian lands, is the program administered by Puerto Rico's Environmental Quality Board (EQB...

  3. 40 CFR 147.2650 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CONTROL PROGRAMS Puerto Rico § 147.2650 State-administered program—Class I, II, III, IV, and V wells. The Underground Injection Control Program for all classes of wells in the Commonwealth of Puerto Rico, other than those on Indian lands, is the program administered by Puerto Rico's Environmental Quality Board (EQB...

  4. ESEA, Title III Dissemination Program Evaluation Report, 1972-73, 1973-74. Sections I and II.

    ERIC Educational Resources Information Center

    Soper, Dorothy B.

    This report evaluates the New Jersey ESEA Title III dissemination program during its first two years, 1972-74. Purposes of the program are to (a) determine if essential elements of successful education programs can be transferred from originating districts to adopter districts while yielding comparable student gains, and (b) provide educators with…

  5. 49 CFR 194.107 - General response plan requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... management system including the functional areas of finance, logistics, operations, planning, and command... economically sensitive areas; (iii) Describe the responsibilities of the operator and of Federal, State and...

  6. 34 CFR 200.41 - School improvement plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... for participating in that professional development; and (iii) Incorporates teacher mentoring...) Within 45 days of receiving a school improvement plan, the LEA must— (i) Establish a peer-review process...

  7. A Statewide Collaboration: Ohio Level III Trauma Centers' Approach to the Development of a Benchmarking System.

    PubMed

    Lang, Carrie L; Simon, Diane; Kilgore, Jane

    The American College of Surgeons Committee on Trauma revised the Resources for Optimal Care of the Injured Patient to include the criteria for trauma centers to participate in a risk-adjusted benchmarking system. Trauma Quality Improvement Program is currently the risk-adjusted benchmarking program sponsored by the American College of Surgeons, which will be required of all trauma centers to participate in early 2017. Prior to this, there were no risk-adjusted programs for Level III verified trauma centers. The Ohio Society of Trauma Nurse Leaders is a collaborative group made up of trauma program managers, coordinators, and other trauma leaders who meet 6 times a year. Within this group, a Level III Subcommittee was formed initially to provide a place for the Level III centers to discuss issues specific to the Level III centers. When the new requirement regarding risk-adjustment became official, the subcommittee agreed to begin reporting simple data points with the idea to risk adjust in the future.

  8. 27. Photograph of a line drawing. 'PLAN LAYOUT AND CROSS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. Photograph of a line drawing. 'PLAN LAYOUT AND CROSS SECTION OF PART III, SECTION 1, EQUIPMENT LAYOUT, BUILDINGS C-1, C-3, C-5, C-6, C-7, C-9 INCL., MIXING, MANUFACTURING AREA, PLANT 'B'.' From the U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant B, Parts II, III. (Nashville, TN: Office of the District Engineer, 1944). - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN

  9. Computer Program (HEVSIM) for Heavy Duty Vehicle Fuel Economy and Performance Simulation. Volume III: Appendices A through F

    DOT National Transportation Integrated Search

    1981-09-01

    Volume III is the third and last volume of a three volume document describing the computer program HEVSIM. This volume includes appendices which list the HEVSIM program, sample part data, some typical outputs and updated nomenclature.

  10. 48 CFR 234.004 - Acquisition strategy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... acquisition strategy. The documentation— (A) Shall include an explanation of the level of program risk; and (B... the reasons for proceeding with Milestone B approval despite the high level of program risk; and (iii...'s written determination that— (A) The program is so complex and technically challenging that it...

  11. 2005 NASA Seal/Secondary Air System Workshop, Volume 1

    NASA Technical Reports Server (NTRS)

    Steinetz, Bruce M. (Editor); Hendricks, Robert C. (Editor)

    2006-01-01

    The 2005 NASA Seal/Secondary Air System workshop covered the following topics: (i) Overview of NASA s new Exploration Initiative program aimed at exploring the Moon, Mars, and beyond; (ii) Overview of the NASA-sponsored Propulsion 21 Project; (iii) Overview of NASA Glenn s seal project aimed at developing advanced seals for NASA s turbomachinery, space, and reentry vehicle needs; (iv) Reviews of NASA prime contractor, vendor, and university advanced sealing concepts including tip clearance control, test results, experimental facilities, and numerical predictions; and (v) Reviews of material development programs relevant to advanced seals development. Turbine engine studies have shown that reducing high-pressure turbine (HPT) blade tip clearances will reduce fuel burn, lower emissions, retain exhaust gas temperature margin, and increase range. Several organizations presented development efforts aimed at developing faster clearance control systems and associated technology to meet future engine needs. The workshop also covered several programs NASA is funding to develop technologies for the Exploration Initiative and advanced reusable space vehicle technologies. NASA plans on developing an advanced docking and berthing system that would permit any vehicle to dock to any on-orbit station or vehicle. Seal technical challenges (including space environments, temperature variation, and seal-on-seal operation) as well as plans to develop the necessary "androgynous" seal technologies were reviewed. Researchers also reviewed tests completed for the shuttle main landing gear door seals.

  12. 44 CFR 201.7 - Tribal Mitigation Plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... buildings, infrastructure, and critical facilities located in the identified hazard areas; (B) An estimate... particular emphasis on new and existing buildings and infrastructure. (iii) An action plan describing how the...

  13. Expanding Earth and Space Science through the Initiating New Science Partnerships In Rural Education (INSPIRE)

    NASA Astrophysics Data System (ADS)

    Radencic, S.; McNeal, K. S.; Pierce, D.; Hare, D.

    2010-12-01

    The INSPIRE program at Mississippi State University (MSU), funded by the NSF Graduate STEM Fellows in K-12 Education (GK12) program, focuses on Earth and Space science education and has partnered ten graduate students from MSU with five teachers from local, rural school districts. For the next five years the project will serve to increase inquiry and technology experiences in science and math while enhancing graduate student’s communication skills. Graduate students, from the disciplines of Geosciences, Physics, and Engineering are partnered with Chemistry, Physical Science, Physics, Geometry and Middle school science classrooms and will create engaging inquiry activities that incorporate elements of their research, and integrate various forms of technology. The generated lesson plans that are implemented in the classroom are published on the INSPIRE home page (www.gk12.msstate.edu) so that other classroom instructors can utilize this free resource. Local 7th -12th grade students will attend GIS day later this fall at MSU to increase their understanding and interest in Earth and Space sciences. Selected graduate students and teachers will visit one of four international university partners located in Poland, Australia, England, or The Bahamas to engage research abroad. Upon return they will incorporate their global experiences into their local classrooms. Planning for the project included many factors important to the success of the partnerships. The need for the program was evident in Mississippi K-12 schools based on low performance on high stakes assessments and lack of curriculum in the Earth and Space sciences. Meeting with administrators to determine what needs they would like addressed by the project and recognizing the individual differences among the schools were integral components to tailoring project goals and to meet the unique needs of each school partner. Time for training and team building of INSPIRE teachers and graduate students before the school year aided in fostering a community atmosphere to ensure successful classroom experiences. Including stakeholders in the progress of lesson plan product development during a workshop luncheon was another key part to building a community of support for INSPIRE. These planning components are essential to the success of the project and are recommended to similar projects. The INSPIRE project external evaluation includes: (i) interviews of participants and K-12 students involved in INSPIRE, (ii) pre-post technology and teaching attitude surveys of graduate students and teachers, (iii) thematic analysis of daily feedback forms from the workshop, (iv) summary of end of workshop evaluations, and (v) constant surveying of program progress towards meeting its goals. Internal evaluation includes: (i) classroom observations of graduate student interactions with students (ii) bi-weekly journal entries from both teachers and graduate students, and (iii) weekly feedback from graduate students. Preliminary evaluation of the workshop daily feedback forms indicate a high level of approval for the technology and inquiry activities modeled. Journal entries indicate that the majority of Fellow-teacher teams experience positive interactions in the classroom.

  14. 40 CFR 62.3916 - Identification of Plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Existing Commercial and Industrial Solid Waste Incineration Units § 62.3916 Identification of Plan. (a... reference subpart III of 40 CFR part 62, the commercial and industrial solid waste incineration rule, which... plan applies to all applicable existing Commercial and Industrial Solid Waste Incineration Units for...

  15. 40 CFR 62.3916 - Identification of Plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Existing Commercial and Industrial Solid Waste Incineration Units § 62.3916 Identification of Plan. (a... reference subpart III of 40 CFR part 62, the commercial and industrial solid waste incineration rule, which... plan applies to all applicable existing Commercial and Industrial Solid Waste Incineration Units for...

  16. 75 FR 63147 - Solicitation of Applications for the Public Works, Economic Adjustment Assistance, and Global...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-14

    ...] Solicitation of Applications for the Public Works, Economic Adjustment Assistance, and Global Climate Change... Program; and (iii) Global Climate Change Mitigation Incentive Fund (GCCMIF) Program. To enhance the...; and (iii) Global Climate Change Mitigation Incentive Fund (GCCMIF) Program. EDA will publish separate...

  17. 75 FR 30385 - Defense Transportation Regulation, Part IV

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-01

    ... extensions will be considered due to the timelines associated with funding and programming future Phase III... extensions will be considered due to the timelines associated with funding and programming future Phase III...

  18. 7 CFR 1781.4 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... III of the Bankhead-Jones Farm Tenant Act (7 U.S.C. 1011). (c) Watershed plan. A plan agreed upon by..., irrigation districts, drainage districts, flood prevention and control districts, school districts, other...

  19. 7 CFR 1781.4 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... III of the Bankhead-Jones Farm Tenant Act (7 U.S.C. 1011). (c) Watershed plan. A plan agreed upon by..., irrigation districts, drainage districts, flood prevention and control districts, school districts, other...

  20. 7 CFR 1781.4 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... III of the Bankhead-Jones Farm Tenant Act (7 U.S.C. 1011). (c) Watershed plan. A plan agreed upon by..., irrigation districts, drainage districts, flood prevention and control districts, school districts, other...

  1. Findings from an Evaluation of a Comprehensive Parent Education Program for School-Age Parents.

    ERIC Educational Resources Information Center

    Braun, Maureen H.; Fuscaldo, Diane P.

    This study evaluates the impact of the Parent Linking Project III (PLP III) on its participants. The PLP III is a comprehensive program for teenage mothers which offers workshops in parenting, mother-child interaction, and vocational awareness, and provides day care services that allow teen mothers to take the opportunity to complete their high…

  2. University of California, Irvine, Student Affirmative Action Five-Year Plan and Planning Process, 1985-1986. Volume III.

    ERIC Educational Resources Information Center

    Galligani, Dennis J.

    An update of the University of California, Irvine, Student Affirmative Action (SAA) plan is presented for 1985-1986. SAA activities planned by both academic and administrative units are covered, such as activities designed to: stimulate greater student involvement, establish clearer life goals and career linkages, enhance cultural awareness, and…

  3. Teacher Performance Evaluation Plan: A Personalized Approach to Supervision, Staff Development, and Evaluation. An Implementation Guide. Revised Edition.

    ERIC Educational Resources Information Center

    Knight, Jeanne; And Others

    This guide provides assistance to New Mexico school districts in implementing a state-sponsored teacher performance evaluation plan (Provision III of the New Mexico Staff Accountability Plan, adopted by the State Board of Education). This plan involves five basic procedures: (1) determine specific definitions of the six essential teaching…

  4. 7 CFR 248.17 - Management evaluations and reviews.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... deficiencies and prevent their future recurrence. (iii) If the corrective action plan is acceptable, FNS will... plan, and whether the deficiency is resolved or further corrective action is needed. Compliance buys...

  5. 40 CFR 52.1490 - Original identification of plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... measures. (ii) A modeling analysis indicating 1982 attainment. (iii) Documentation of the modeling analysis... agencies, (ii) Additional supporting documentation for the 1982 attainment modeling analysis which included... factors for the model. (iii) A revised 1982 attainment modeling analysis and supporting documentation...

  6. 40 CFR 52.1490 - Original identification of plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... measures. (ii) A modeling analysis indicating 1982 attainment. (iii) Documentation of the modeling analysis... agencies, (ii) Additional supporting documentation for the 1982 attainment modeling analysis which included... factors for the model. (iii) A revised 1982 attainment modeling analysis and supporting documentation...

  7. 40 CFR 52.1490 - Original identification of plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... measures. (ii) A modeling analysis indicating 1982 attainment. (iii) Documentation of the modeling analysis... agencies, (ii) Additional supporting documentation for the 1982 attainment modeling analysis which included... factors for the model. (iii) A revised 1982 attainment modeling analysis and supporting documentation...

  8. The Trajectory of Dispersal Research in Conservation Biology. Systematic Review

    PubMed Central

    Driscoll, Don A.; Banks, Sam C.; Barton, Philip S.; Ikin, Karen; Lentini, Pia; Lindenmayer, David B.; Smith, Annabel L.; Berry, Laurence E.; Burns, Emma L.; Edworthy, Amanda; Evans, Maldwyn J.; Gibson, Rebecca; Heinsohn, Rob; Howland, Brett; Kay, Geoff; Munro, Nicola; Scheele, Ben C.; Stirnemann, Ingrid; Stojanovic, Dejan; Sweaney, Nici; Villaseñor, Nélida R.; Westgate, Martin J.

    2014-01-01

    Dispersal knowledge is essential for conservation management, and demand is growing. But are we accumulating dispersal knowledge at a pace that can meet the demand? To answer this question we tested for changes in dispersal data collection and use over time. Our systematic review of 655 conservation-related publications compared five topics: climate change, habitat restoration, population viability analysis, land planning (systematic conservation planning) and invasive species. We analysed temporal changes in the: (i) questions asked by dispersal-related research; (ii) methods used to study dispersal; (iii) the quality of dispersal data; (iv) extent that dispersal knowledge is lacking, and; (v) likely consequences of limited dispersal knowledge. Research questions have changed little over time; the same problems examined in the 1990s are still being addressed. The most common methods used to study dispersal were occupancy data, expert opinion and modelling, which often provided indirect, low quality information about dispersal. Although use of genetics for estimating dispersal has increased, new ecological and genetic methods for measuring dispersal are not yet widely adopted. Almost half of the papers identified knowledge gaps related to dispersal. Limited dispersal knowledge often made it impossible to discover ecological processes or compromised conservation outcomes. The quality of dispersal data used in climate change research has increased since the 1990s. In comparison, restoration ecology inadequately addresses large-scale process, whilst the gap between knowledge accumulation and growth in applications may be increasing in land planning. To overcome apparent stagnation in collection and use of dispersal knowledge, researchers need to: (i) improve the quality of available data using new approaches; (ii) understand the complementarities of different methods and; (iii) define the value of different kinds of dispersal information for supporting management decisions. Ambitious, multi-disciplinary research programs studying many species are critical for advancing dispersal research. PMID:24743447

  9. The trajectory of dispersal research in conservation biology. Systematic review.

    PubMed

    Driscoll, Don A; Banks, Sam C; Barton, Philip S; Ikin, Karen; Lentini, Pia; Lindenmayer, David B; Smith, Annabel L; Berry, Laurence E; Burns, Emma L; Edworthy, Amanda; Evans, Maldwyn J; Gibson, Rebecca; Heinsohn, Rob; Howland, Brett; Kay, Geoff; Munro, Nicola; Scheele, Ben C; Stirnemann, Ingrid; Stojanovic, Dejan; Sweaney, Nici; Villaseñor, Nélida R; Westgate, Martin J

    2014-01-01

    Dispersal knowledge is essential for conservation management, and demand is growing. But are we accumulating dispersal knowledge at a pace that can meet the demand? To answer this question we tested for changes in dispersal data collection and use over time. Our systematic review of 655 conservation-related publications compared five topics: climate change, habitat restoration, population viability analysis, land planning (systematic conservation planning) and invasive species. We analysed temporal changes in the: (i) questions asked by dispersal-related research; (ii) methods used to study dispersal; (iii) the quality of dispersal data; (iv) extent that dispersal knowledge is lacking, and; (v) likely consequences of limited dispersal knowledge. Research questions have changed little over time; the same problems examined in the 1990s are still being addressed. The most common methods used to study dispersal were occupancy data, expert opinion and modelling, which often provided indirect, low quality information about dispersal. Although use of genetics for estimating dispersal has increased, new ecological and genetic methods for measuring dispersal are not yet widely adopted. Almost half of the papers identified knowledge gaps related to dispersal. Limited dispersal knowledge often made it impossible to discover ecological processes or compromised conservation outcomes. The quality of dispersal data used in climate change research has increased since the 1990s. In comparison, restoration ecology inadequately addresses large-scale process, whilst the gap between knowledge accumulation and growth in applications may be increasing in land planning. To overcome apparent stagnation in collection and use of dispersal knowledge, researchers need to: (i) improve the quality of available data using new approaches; (ii) understand the complementarities of different methods and; (iii) define the value of different kinds of dispersal information for supporting management decisions. Ambitious, multi-disciplinary research programs studying many species are critical for advancing dispersal research.

  10. Development, design, and conceptual issues of project zero exposure: A program to protect young children from tobacco smoke exposure.

    PubMed

    Rosen, Laura J; Guttman, Nurit; Hovell, Melbourne F; Noach, Michal Ben; Winickoff, Jonathan P; Tchernokovski, Shosh; Rosenblum, Joseph K; Rubenstein, Uri; Seidmann, Vered; Vardavas, Constantine I; Klepeis, Neil E; Zucker, David M

    2011-06-28

    Tobacco smoke exposure (TSE) is a serious threat to child health. Roughly 40% of children worldwide are exposed to tobacco smoke, and the very young are often "captive smokers" in homes in which others smoke.The goal of this research project is to develop and evaluate an intervention to reduce young child tobacco smoke exposure. The objective of this paper is to document our approach to building the intervention, to describe the planned intervention, and to explore the conceptual issues regarding the intervention and its evaluation. This project is being developed using an iterative approach. We are currently in the middle of Stage 1. In this first stage, Intervention Development, we have already conducted a comprehensive search of the professional literature and internet resources, consulted with experts in the field, and conducted several Design Workshops. The planned intervention consists of parental group support therapy, a website to allow use of an "online/offline" approach, involvement of pediatricians, use of a video simulation game ("Dr. Cruz") to teach parents about child TSE, and personalized biochemical feedback on exposure levels. As part of this stage we will draw on a social marketing approach. We plan to use in-depth interviews and focus groups in order to identify barriers for behavior change, and to test the acceptability of program components.In Stage II, we plan to pilot the planned intervention with 5-10 groups of 10 parents each.In Stage III, we plan to implement and evaluate the intervention using a cluster randomized controlled trial with an estimated 540 participants. The major challenges in this research are twofold: building an effective intervention and measuring the effects of the intervention. Creation of an effective intervention to protect children from TSE is a challenging but sorely needed public health endeavor. We hope that our approach will contribute to building a stronger evidence base for control of child exposure to tobacco smoke.

  11. Family welfare and health practices increase after exposure to population education.

    PubMed

    1994-01-01

    Since 1987, the State Resource Center of Jamia Millia Islamia of New Delhi has been implementing a program which integrates population education contents into its literacy education classes for adult learners. Using the core messages on family size, spacing of children, responsible parenthood, right age of marriage, population-related beliefs and customs and population and development, the Center undertook many activities such as: i) integrating population contents in literacy primers, readers and supplementary reading books; ii) development of teaching aids and instructor's resource materials; iii) organization of training for instructors and iv) holding outreach activities such as street corner plays, fairs, etc. To evaluate the impact of the program, the Center undertook an impact survey to measure the level of knowledge, attitude and practices of randomly selected beneficiaries of the project, i.e. 934 learners from 85 literacy learning centers, 5 years after the introduction of the population education program. The study used pre-test and post-test method for collecting data and to compare results. In terms of practice, the study has shown that the respondents having knowledge about family planning methods increased from 67 to 87%, after being exposed to the project's activities. There was also an increase of 61% in cases adopting family planning methods over the pre-measurement level. More importantly, there was not only an increase in awareness of public health and family welfare services but a 137% increase was registered in the use of public health and family welfare facilities for family planning counseling and services. With regard to knowledge and attitude on the various population education messages promoted by the project, the study has shown a 40% increase in "high" knowledge category and 25% increase in favorable attitude after the exposure to the project. full text

  12. Role of premission testing in the National Missile Defense system

    NASA Astrophysics Data System (ADS)

    Tillman, Janice V.; Atkinson, Beverly

    2001-09-01

    The purpose of the National Missile Defense (NMD) system is to provide detection, discrimination, engagement, interception, and negation of ballistic missile attacks targeted at the United States (U.S.), including Alaska and Hawaii. This capability is achieved through the integration of weapons, sensors, and a battle management, command, control and communications (BMC3) system. The NMD mission includes surveillance, warning, cueing, and engagement of threat objects prior to potential impact on U.S. targets. The NMD Acquisition Strategy encompasses an integrated test program using Integrated Ground Tests (IGTs), Integrated Flight Tests (IFTs), Risk Reduction Flights (RRFs), Pre Mission Tests (PMTs), Command and Control (C2) Simulations, and other Specialty Tests. The IGTs utilize software-in-the-loop/hardware-in-the-loop (SWIL / HWIL) and digital simulations. The IFTs are conducted with targets launched from Vandenberg Air Force Base (VAFB) and interceptors launched from Kwajalein Missile Range (KMR). The RRFs evaluate NMD BMC3 and NMD sensor functional performance and integration by leveraging planned Peacekeeper and Minuteman III operational test flights and other opportunities without employing the NMD interceptor. The PMTs are nondestructive System-level tests representing the use of NMD Element Test Assets in their IFT configuration and are conducted to reduce risks in achieving the IFT objectives. Specifically, PMTs are used to reduce integration, interface, and performance risks associated with Flight Tests to ensure that as much as possible, the System is tested without expending a target or an interceptor. This paper examines several critical test planning and analysis functions as they relate to the NMD Integrated Flight Test program and, in particular, to Pre-Mission Testing. Topics to be discussed include: - Flight-test program planning; - Pre-Test Integration activities; and - Test Execution, Analysis, and Post-Flight Reconstruction.

  13. Strategic Planning for Interdisciplinary Science: a Geoscience Success Story

    NASA Astrophysics Data System (ADS)

    Harshvardhan, D.; Harbor, J. M.

    2003-12-01

    The Department of Earth and Atmospheric Sciences at Purdue University has engaged in a continuous strategic planning exercise for several years, including annual retreats since 1997 as an integral part of the process. The daylong Saturday retreat at the beginning of the fall semester has been used to flesh out the faculty hiring plan for the coming year based on the prior years' plans. The finalized strategic plan is built around the choice of three signature areas, two in disciplinary fields, (i) geodynamics and active tectonics, (ii) multi-scale atmospheric interactions and one interdisciplinary area, (iii) atmosphere/surface interactions. Our experience with strategic planning and the inherently interdisciplinary nature of geoscience helped us recently when our School of Science, which consists of seven departments, announced a competition for 60 new faculty positions that would be assigned based on the following criteria, listed in order of priority - (i) scientific merit and potential for societal impact, (ii) multidisciplinary nature of topic - level of participation and leveraging potential, (iii) alignment with Purdue's strategic plan - discovery, learning, engagement, (iv) existence of critical mass at Purdue and availability of faculty and student candidate pools, (v) corporate and federal sponsor interest. Some fifty white papers promoting diverse fields were submitted to the school and seven were chosen after a school-wide retreat. The department fared exceedingly well and we now have significant representation on three of the seven school areas of coalescence - (i) climate change, (ii) computational science and (iii) science education research. We are now in the process of drawing up hiring plans and developing strategies for allocation and reallocation of resources such as laboratory space and faculty startup to accommodate the 20% growth in faculty strength that is expected over the next five years.

  14. Environmental, health, and safety issues of fuel cells in transportation. Volume 1: Phosphoric acid fuel-cell buses

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ring, S

    1994-12-01

    The U.S. Department of Energy (DOE) chartered the Phosphoric Acid Fuel-Cell (PAFC) Bus Program to demonstrate the feasibility of fuel cells in heavy-duty transportation systems. As part of this program, PAFC- powered buses are being built to meet transit industry design and performance standards. Test-bed bus-1 (TBB-1) was designed in 1993 and integrated in March 1994. TBB-2 and TBB-3 are under construction and should be integrated in early 1995. In 1987 Phase I of the program began with the development and testing of two conceptual system designs- liquid- and air-cooled systems. The liquid-cooled PAFC system was chosen to continue, throughmore » a competitive award, into Phase H, beginning in 1991. Three hybrid buses, which combine fuel-cell and battery technologies, were designed during Phase III. After completing Phase II, DOE plans a comprehensive performance testing program (Phase HI) to verify that the buses meet stringent transit industry requirements. The Phase III study will evaluate the PAFC bus and compare it to a conventional diesel bus. This NREL study assesses the environmental, health, and safety (EH&S) issues that may affect the commercialization of the PAFC bus. Because safety is a critical factor for consumer acceptance of new transportation-based technologies the study focuses on these issues. The study examines health and safety together because they are integrally related. In addition, this report briefly discusses two environmental issues that are of concern to the Environmental Protection Agency (EPA). The first issue involves a surge battery used by the PAFC bus that contains hazardous constituents. The second issue concerns the regulated air emissions produced during operation of the PAFC bus.« less

  15. Field Sampling Plan/Quality Assurance Project Plan Volume I of III

    EPA Pesticide Factsheets

    This document contains procedures related to the collection and analysis of soil, sediment, groundwater, surface water, air and biota samples at GE’s Pittsfield, Massachusetts facility and at other areas.

  16. 33 CFR Appendix B to Part 155 - Determining and Evaluating Required Response Resources for Vessel Response Plans

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... carried [persistent (groups II, III, and IV) or non-persistent (group I)]; and the geographic area(s) in... type of petroleum oil carried [persistent (groups II, III, and IV) or non-persistent (group I)]; and... Petroleum Oil Cargo Groups Non-persistent oil 72 G: Group I 1.0 Persistent oil: Group II 1.8 Group III 2.0...

  17. 33 CFR Appendix B to Part 155 - Determining and Evaluating Required Response Resources for Vessel Response Plans

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... carried [persistent (groups II, III, and IV) or non-persistent (group I)]; and the geographic area(s) in... type of petroleum oil carried [persistent (groups II, III, and IV) or non-persistent (group I)]; and... Petroleum Oil Cargo Groups Non-persistent oil 72 G: Group I 1.0 Persistent oil: Group II 1.8 Group III 2.0...

  18. 33 CFR Appendix B to Part 155 - Determining and Evaluating Required Response Resources for Vessel Response Plans

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... carried [persistent (groups II, III, and IV) or non-persistent (group I)]; and the geographic area(s) in... type of petroleum oil carried [persistent (groups II, III, and IV) or non-persistent (group I)]; and... Petroleum Oil Cargo Groups Non-persistent oil 72 G: Group I 1.0 Persistent oil: Group II 1.8 Group III 2.0...

  19. Development of an autonomous treatment planning strategy for radiation therapy with effective use of population-based prior data.

    PubMed

    Wang, Huan; Dong, Peng; Liu, Hongcheng; Xing, Lei

    2017-02-01

    Current treatment planning remains a costly and labor intensive procedure and requires multiple trial-and-error adjustments of system parameters such as the weighting factors and prescriptions. The purpose of this work is to develop an autonomous treatment planning strategy with effective use of prior knowledge and in a clinically realistic treatment planning platform to facilitate radiation therapy workflow. Our technique consists of three major components: (i) a clinical treatment planning system (TPS); (ii) a formulation of decision-function constructed using an assemble of prior treatment plans; (iii) a plan evaluator or decision-function and an outer-loop optimization independent of the clinical TPS to assess the TPS-generated plan and to drive the search toward a solution optimizing the decision-function. Microsoft (MS) Visual Studio Coded UI is applied to record some common planner-TPS interactions as subroutines for querying and interacting with the TPS. These subroutines are called back in the outer-loop optimization program to navigate the plan selection process through the solution space iteratively. The utility of the approach is demonstrated by using clinical prostate and head-and-neck cases. An autonomous treatment planning technique with effective use of an assemble of prior treatment plans is developed to automatically maneuver the clinical treatment planning process in the platform of a commercial TPS. The process mimics the decision-making process of a human planner and provides a clinically sensible treatment plan automatically, thus reducing/eliminating the tedious manual trial-and-errors of treatment planning. It is found that the prostate and head-and-neck treatment plans generated using the approach compare favorably with that used for the patients' actual treatments. Clinical inverse treatment planning process can be automated effectively with the guidance of an assemble of prior treatment plans. The approach has the potential to significantly improve the radiation therapy workflow. © 2016 American Association of Physicists in Medicine.

  20. 40 CFR 147.251 - EPA-administered program-Class I, III, IV and V wells and Indian lands.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., IV and V wells and Indian lands. 147.251 Section 147.251 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS California § 147.251 EPA-administered program—Class I, III, IV and V wells and...

  1. 40 CFR 147.301 - EPA-administered program-Class I, III, IV, V wells and Indian lands.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., IV, V wells and Indian lands. 147.301 Section 147.301 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS Colorado § 147.301 EPA-administered program—Class I, III, IV, V wells and Indian...

  2. Youth Services Training Program 1972-1976: A Title III Project.

    ERIC Educational Resources Information Center

    Luskin, Bernice; And Others

    Described is a Title III work study model to provide a 4-year vocational training program for approximately 40 handicapped junior and senior high school students in Westport, Connecticut. Program activities (such as conferences with employers) and the needed professional personnel (such as a school psychologist) are outlined for each of the…

  3. 25 CFR 36.12 - Standard III-Program needs assessment.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Standard III-Program needs assessment. 36.12 Section 36... Management § 36.12 Standard III—Program needs assessment. The policy and procedures of each school and its curricula shall be developed and revised based on an assessment of educational needs. This needs assessment...

  4. 25 CFR 36.12 - Standard III-Program needs assessment.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Standard III-Program needs assessment. 36.12 Section 36.12... § 36.12 Standard III—Program needs assessment. The policy and procedures of each school and its curricula shall be developed and revised based on an assessment of educational needs. This needs assessment...

  5. 25 CFR 36.12 - Standard III-Program needs assessment.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Standard III-Program needs assessment. 36.12 Section 36... Management § 36.12 Standard III—Program needs assessment. The policy and procedures of each school and its curricula shall be developed and revised based on an assessment of educational needs. This needs assessment...

  6. 25 CFR 36.12 - Standard III-Program needs assessment.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Standard III-Program needs assessment. 36.12 Section 36... Management § 36.12 Standard III—Program needs assessment. The policy and procedures of each school and its curricula shall be developed and revised based on an assessment of educational needs. This needs assessment...

  7. 40 CFR 147.251 - EPA-administered program-Class I, III, IV and V wells and Indian lands.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., IV and V wells and Indian lands. 147.251 Section 147.251 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS California § 147.251 EPA-administered program—Class I, III, IV and V wells and...

  8. 40 CFR 147.301 - EPA-administered program-Class I, III, IV, V wells and Indian lands.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., IV, V wells and Indian lands. 147.301 Section 147.301 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS Colorado § 147.301 EPA-administered program—Class I, III, IV, V wells and Indian...

  9. Vaginal delivery of breech presentation.

    PubMed

    Kotaska, Andrew; Menticoglou, Savas; Gagnon, Robert

    2009-06-01

    To review the physiology of breech birth; to discern the risks and benefits of a trial of labour versus planned Caesarean section; and to recommend to obstetricians, family physicians, midwives, obstetrical nurses, anaesthesiologists, pediatricians, and other health care providers selection criteria, intrapartum management parameters, and delivery techniques for a trial of vaginal breech birth. Trial of labour in an appropriate setting or delivery by pre-emptive Caesarean section for women with a singleton breech fetus at term. Reduced perinatal mortality, short-term neonatal morbidity, long-term infant morbidity, and short- and long-term maternal morbidity and mortality. Medline was searched for randomized trials, prospective cohort studies, and selected retrospective cohort studies comparing planned Caesarean section with a planned trial of labour; selected epidemiological studies comparing delivery by Caesarean section with vaginal breech delivery; and studies comparing long-term outcomes in breech infants born vaginally or by Caesarean section. Additional articles were identified through bibliography tracing up to June 1, 2008. The evidence collected was reviewed by the Maternal Fetal Medicine Committee of the Society of Obstetricians and Gynaecologists of Canada (SOGC) and quantified using the criteria and classifications of the Canadian Task Force on Preventive Health Care. This guideline was compared with the 2006 American College of Obstetrician's Committee Opinion on the mode of term singleton breech delivery and with the 2006 Royal College of Obstetrician and Gynaecologists Green Top Guideline: The Management of Breech Presentation. The document was reviewed by Canadian and International clinicians with particular expertise in breech vaginal delivery. The Society of Obstetricians and Gynaecologists of Canada. SUMMARY STATEMENTS: 1. Vaginal breech birth can be associated with a higher risk of perinatal mortality and short-term neonatal morbidity than elective Caesarean section. (I) 2. Careful case selection and labour management in a modern obstetrical setting may achieve a level of safety similar to elective Caesarean section. (II-1) 3. Planned vaginal delivery is reasonable in selected women with a term singleton breech fetus. (I) 4. With careful case selection and labour management, perinatal mortality occurs in approximately 2 per 1000 births and serious short-term neonatal morbidity in approximately 2% of breech infants. Many recent retrospective and prospective reports of vaginal breech delivery that follow specific protocols have noted excellent neonatal outcomes. (II-1) 5. Long-term neurological infant outcomes do not differ by planned mode of delivery even in the presence of serious short-term neonatal morbidity. (I) RECOMMENDATIONS: LABOUR SELECTION CRITERIA: 1. For a woman with suspected breech presentation, pre- or early labour ultrasound should be performed to assess type of breech presentation, fetal growth and estimated weight, and attitude of fetal head. If ultrasound is not available, Caesarean section is recommended. (II-1A) 2. Contraindications to labour include a. Cord presentation (II-3A) b. Fetal growth restriction or macrosomia (I-A) c. Any presentation other than a frank or complete breech with a flexed or neutral head attitude (III-B) d. Clinically inadequate maternal pelvis (III-B) e. Fetal anomaly incompatible with vaginal delivery (III-B) 3. Vaginal breech delivery can be offered when the estimated fetal weight is between 2500 g and 4000 g. (II-2B) LABOUR MANAGEMENT: 4. Clinical pelvic examination should be performed to rule out pathological pelvic contraction. Radiologic pelvimetry is not necessary for a safe trial of labour; good progress in labour is the best indicator of adequate fetal-pelvic proportions. (III-B) 5. Continuous electronic fetal heart monitoring is preferable in the first stage and mandatory in the second stage of labour. (I-A) When membranes rupture, immediate vaginal examination is recommended to rule out prolapsed cord. (III-B) 6. In the absence of adequate progress in labour, Caesarean section is advised. (II-1A) 7. Induction of labour is not recommended for breech presentation. (II-3B) Oxytocin augmentation is acceptable in the presence of uterine dystocia. (II-1A) 8. A passive second stage without active pushing may last up to 90 minutes, allowing the breech to descend well into the pelvis. Once active pushing commences, if delivery is not imminent after 60 minutes, Caesarean section is recommended. (I-A) 9. The active second stage of labour should take place in or near an operating room with equipment and personnel available to perform a timely Caesarean section if necessary. (III-A) 10. A health care professional skilled in neonatal resuscitation should be in attendance at the time of delivery. (III-A) DELIVERY TECHNIQUE: 11. The health care provider for a planned vaginal breech delivery needs to possess the requisite skills and experience. (II-1A) 12. An experienced obstetrician-gynaecologist comfortable in the performance of vaginal breech delivery should be present at the delivery to supervise other health care providers, including a trainee. (I-A) 13. The requirements for emergency Caesarean section, including availability of the hospital operating room team and the approximate 30-minute timeline to commence a laparotomy, must be in accordance with the recommendations of the SOGC Policy Statement, "Attendance at Labour and Delivery" (CPG No. 89; update in press, 2009). (III-A) 14. The health care provider should have rehearsed a plan of action and should be prepared to act promptly in the rare circumstance of a trapped after-coming head or irreducible nuchal arms: symphysiotomy or emergency abdominal rescue can be life saving. (III-B) 15. Total breech extraction is inappropriate for term singleton breech delivery. (II-2A) 16. Effective maternal pushing efforts are essential to safe delivery and should be encouraged. (II-1A) 17. At the time of delivery of the after-coming head, an assistant should be present to apply suprapubic pressure to favour flexion and engagement of the fetal head. (II-3B) 18. Spontaneous or assisted breech delivery is acceptable. Fetal traction should be avoided, and fetal manipulation must be applied only after spontaneous delivery to the level of the umbilicus. (III-A) 19. Nuchal arms may be reduced by the Løvset or Bickenbach manoeuvres. (III-B) 20. The fetal head may deliver spontaneously, with the assistance of suprapubic pressure, by Mauriceau-Smellie-Veit manoeuvre, or with the assistance of Piper forceps. (III-B) SETTING AND CONSENT: 21. In the absence of a contraindication to vaginal delivery, a woman with a breech presentation should be informed of the risks and benefits of a trial of labour and elective Caesarean section, and informed consent should be obtained. A woman's choice of delivery mode should be respected. (III-A) 22. The consent discussion and chosen plan should be well documented and communicated to labour-room staff. (III-B) 23. Hospitals offering a trial of labour should have a written protocol for eligibility and intrapartum management. (III-B) 24. Women with a contraindication to a trial of labour should be advised to have a Caesarean section. Women choosing to labour despite this recommendation have a right to do so and should not be abandoned. They should be provided the best possible in-hospital care. (III-A) 25. The Society of Obstetricians and Gynaecologists of Canada (SOGC), in collaboration with the Association of Professors of Obstetrics and Gynaecology (APOG), The College of Family Physicians of Canada (CFPC), and The Canadian Association of Midwives (CAM) should revise the training requirements at the undergraduate and postgraduate levels. SOGC will continue to promote training of current health care providers through the MOREOB, ALARM (Advances in Labour and Risk Management), and other courses. (III-A) 26. Theoretical and hands-on breech birth training simulation should be part of basic obstetrical skills training programs such as ALARM, ALSO (Advanced Life Support Training in Obstetrics), and MOREOB to prepare health care providers for unexpected vaginal breech births. (III-B).

  10. 40 CFR 147.2200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the in situ combustion of coal are regulated by the Rail Road Commission of Texas under a separate UIC... program for Class I, III, IV, and V wells in the State of Texas, except for those wells on Indian lands... (SDWA). Notice of the original approval for Class I, III, IV, and V wells was published in the Federal...

  11. 40 CFR 147.2200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the in situ combustion of coal are regulated by the Rail Road Commission of Texas under a separate UIC... program for Class I, III, IV, and V wells in the State of Texas, except for those wells on Indian lands... (SDWA). Notice of the original approval for Class I, III, IV, and V wells was published in the Federal...

  12. Annual Report of the National Science Foundation on Contract NSF-C414 Task III July 1966 through June 1967.

    ERIC Educational Resources Information Center

    American Chemical Society, Columbus, OH. Chemical Abstracts Service.

    This Annual Report describes in detail the work performed during the first year of Task III of Contract NSF-C414 and the present status of Task III work. The programs and achievements described constitute the first significant efforts to develop a user-oriented, cooperative program between major secondary scientific and technical information…

  13. 78 FR 69302 - National Oil and Hazardous Substances Pollution Contingency Plan; National Priorities List...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-19

    ..., II-T, III-C, I-C, II-U, I-B, I-E, I-G, I-H, I-I, I-J, I-L, I-M, I-P, II-G, II-I, II-P, III-D, I-K, I..., I-H, I-I, I-J, I-L, I-M, I-P, II-G, II-I, II-P, III-D, I-K, I-N, I-O, I-S, II-E, II-L, II-M, II-R, I... 102(h) of CERCLA, to document that all environmental impacts associated with the DON's activities on...

  14. 40 CFR Appendix III to Part 1068 - High-Altitude Counties

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 33 2011-07-01 2011-07-01 false High-Altitude Counties III Appendix III to Part 1068 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS GENERAL COMPLIANCE PROVISIONS FOR ENGINE PROGRAMS Pt. 1068, App. III Appendix III to Part 1068...

  15. 40 CFR Appendix III to Part 1068 - High-Altitude Counties

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 32 2010-07-01 2010-07-01 false High-Altitude Counties III Appendix III to Part 1068 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS GENERAL COMPLIANCE PROVISIONS FOR ENGINE PROGRAMS Pt. 1068, App. III Appendix III to Part 1068...

  16. 42 CFR 423.128 - Dissemination of Part D plan information.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... coverage determination and redetermination processes via an Internet Web site; and (iii) A system that... determination by contacting the plan sponsor's toll free customer service line or by accessing the plan sponsor's internet Web site. (8) Quality assurance policies and procedures. A description of the quality...

  17. 42 CFR 423.128 - Dissemination of Part D plan information.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... coverage determination and redetermination processes via an Internet Web site; and (iii) A system that... determination by contacting the plan sponsor's toll free customer service line or by accessing the plan sponsor's internet Web site. (8) Quality assurance policies and procedures. A description of the quality...

  18. 42 CFR 423.128 - Dissemination of Part D plan information.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... coverage determination and redetermination processes via an Internet Web site; and (iii) A system that... determination by contacting the plan sponsor's toll free customer service line or by accessing the plan sponsor's internet Web site. (8) Quality assurance policies and procedures. A description of the quality...

  19. 29 CFR 4010.8 - Plan actuarial information.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Terminated vested participants, and (iii) Active participants; (2) The fair market value of the plan's assets... used to determine the benefit liabilities in paragraph (a)(3) of this section; (5) The funding target... consecutive period of at least five plan years; (6) The funding target attainment percentage (as of the...

  20. 75 FR 54177 - Notice of Availability of the Draft Jarbidge Field Office Resource Management Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-03

    ... throughout the planning area. Alternative III focuses on restoring the resiliency of ecosystem structure and... planning area. Alternative IV focuses on actively restoring the resiliency of ecosystem structure and... Development. Sand Point ACEC (950 acres) Relevant and Important Values: Cultural, Geologic, Historic...

  1. A procedure to evaluate environmental rehabilitation in limestone quarries.

    PubMed

    Neri, Ana Claudia; Sánchez, Luis Enrique

    2010-11-01

    A procedure to evaluate mine rehabilitation practices during the operational phase was developed and validated. It is based on a comparison of actually observed or documented practices with internationally recommended best practices (BP). A set of 150 BP statements was derived from international guides in order to establish the benchmark. The statements are arranged in six rehabilitation programs under three categories: (1) planning (2) operational and (3) management, corresponding to the adoption of the plan-do-check-act management systems model to mine rehabilitation. The procedure consists of (i) performing technical inspections guided by a series of field forms containing BP statements; (ii) classifying evidences in five categories; and (iii) calculating conformity indexes and levels. For testing and calibration purposes, the procedure was applied to nine limestone quarries and conformity indexes were calculated for the rehabilitation programs in each quarry. Most quarries featured poor planning practices, operational practices reached high conformity levels in 50% of the cases and management practices scored moderate conformity. Despite all quarries being ISO 14001 certified, their management systems pay low attention to issues pertaining to land rehabilitation and biodiversity. The best results were achieved by a quarry whose expansion was recently submitted to the environmental impact assessment process, suggesting that public scrutiny may play a positive role in enhancing rehabilitation practices. Conformity indexes and levels can be used to chart the evolution of rehabilitation practices at regular intervals, to establish corporate goals and for communication with stakeholders. Copyright 2010 Elsevier Ltd. All rights reserved.

  2. Impact of 3-dimensional-computed tomography workstation for precise planning of endovascular aneurysm repair.

    PubMed

    Higashiura, Wataru; Sakaguchi, Shoji; Tabayashi, Nobuoki; Taniguchi, Shigeki; Kichikawa, Kimihiko

    2008-12-01

    Compared with open surgery, imaging is considered to be important for planning and device selection of endovascular aneurysm repair (EVAR). The present study evaluated the usefulness of a 3-dimensional (3D)-computed tomography (CT) workstation in planning EVAR. A prospective study was conducted in 8 patients who underwent EVAR using Zenith endograft between February and August 2007. Endograft size and optimized deployment projection were decided using a 3D-CT workstation. The primary endpoint was defined as successful deployment of a same size endograft as preoperatively selected without type I or III endoleak or inadvertent arterial occlusion. The following parameters were investigated: (a) incidence of use of an alternative endograft; (b) prevalence of type I or III endoleak; and (c) distance from lowest renal artery to tip of graft. Successful deployment of endograft was achieved in all 8 patients. Use of alternative endograft or type I or III endoleak was not detected in 8 patients. Distance from the lowest renal artery to the tip of the graft was 2.8mm. Assessment using a 3D-CT workstation appears to allow accurate endograft selection and precise deployment of the Zenith endograft without type I or III endoleak, even in institutes with a small number of patients.

  3. FINAL REPORT FOR THE REDUCTION OF CHROME (VI) TO CHROME (III) IN THE SECONDARY WASTE STREAM OF THE EFFLUENT TREATMENT FACILITY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DUNCAN JB; GUTHRIE MD

    2008-08-29

    This report documents the laboratory results of RPP-PLAN-35958, Test Plan for the Effluent Treatment Facility to Reduce Chrome (VI) to Chrome (III) in the Secondary Waste Stream With the exception of the electrochemical corrosion scans, all work was carried out at the Center for Laboratory Science (CLS) located at the Columbia Basin College. This document summarizes the work carried out at CLS and includes the electrochemical scans and associated corrosion rates for 304 and 316L stainless steel.

  4. Study of Alternate Space Shuttle Concepts. Volume 2, Part 2: Concept Analysis and Definition

    NASA Technical Reports Server (NTRS)

    1971-01-01

    This is the final report of a Phase A Study of Alternate Space Shuttle Concepts by the Lockheed Missiles & Space Company (LMSC) for the National Aeronautics and Space Administration George C. Marshall Space Flight Center (MSFC). The eleven-month study, which began on 30 June 1970, is to examine the stage-and-one-half and other Space Shuttle configurations and to establish feasibility, performance, cost, and schedules for the selected concepts. This final report consists of four volumes as follows: Volume I - Executive Summary, Volume II - Concept Analysis and Definition, Volume III - Program Planning, and Volume IV - Data Cost Data. This document is Volume II, Concept Analysis and Definition.

  5. Viewpoints on Medical Image Processing: From Science to Application

    PubMed Central

    Deserno (né Lehmann), Thomas M.; Handels, Heinz; Maier-Hein (né Fritzsche), Klaus H.; Mersmann, Sven; Palm, Christoph; Tolxdorff, Thomas; Wagenknecht, Gudrun; Wittenberg, Thomas

    2013-01-01

    Medical image processing provides core innovation for medical imaging. This paper is focused on recent developments from science to applications analyzing the past fifteen years of history of the proceedings of the German annual meeting on medical image processing (BVM). Furthermore, some members of the program committee present their personal points of views: (i) multi-modality for imaging and diagnosis, (ii) analysis of diffusion-weighted imaging, (iii) model-based image analysis, (iv) registration of section images, (v) from images to information in digital endoscopy, and (vi) virtual reality and robotics. Medical imaging and medical image computing is seen as field of rapid development with clear trends to integrated applications in diagnostics, treatment planning and treatment. PMID:24078804

  6. Viewpoints on Medical Image Processing: From Science to Application.

    PubMed

    Deserno Né Lehmann, Thomas M; Handels, Heinz; Maier-Hein Né Fritzsche, Klaus H; Mersmann, Sven; Palm, Christoph; Tolxdorff, Thomas; Wagenknecht, Gudrun; Wittenberg, Thomas

    2013-05-01

    Medical image processing provides core innovation for medical imaging. This paper is focused on recent developments from science to applications analyzing the past fifteen years of history of the proceedings of the German annual meeting on medical image processing (BVM). Furthermore, some members of the program committee present their personal points of views: (i) multi-modality for imaging and diagnosis, (ii) analysis of diffusion-weighted imaging, (iii) model-based image analysis, (iv) registration of section images, (v) from images to information in digital endoscopy, and (vi) virtual reality and robotics. Medical imaging and medical image computing is seen as field of rapid development with clear trends to integrated applications in diagnostics, treatment planning and treatment.

  7. 2009 Iowa railroad system plan : part III.

    DOT National Transportation Integrated Search

    2009-01-01

    The 2009 Iowa Railroad System Plan is intended to guide the Iowa Department of Transportation (DOT) in its activities of promoting access to rail transportation, helping to improve the freight railroad transportation system, expanding passenger rail ...

  8. 23 CFR 710.203 - Funding and reimbursement.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... planning, right-of-way plan preparation, title work, and similar necessary right-of-way related work. (iii... settlements in accordance with 49 CFR 24.102(i), legal settlements, court awards, and costs incidental to the...

  9. Chesapeake Bay Watershed Implementation Plans (WIPs)

    EPA Pesticide Factsheets

    This page provides an overview of Watershed Implementation Plans (WIP) and how they play an important role in restoring the Chesapeake Bay. The page also provides links to each jurisdiction's Phase I, II, and III WIP.

  10. 40 CFR 262.105 - What must be included in the laboratory environmental management plan?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... management of laboratory wastes and from the reuse, recycling or disposal of such materials outside the... for the purpose of supporting continual improvement of the Environmental Management Plan. (iii...

  11. 40 CFR 262.105 - What must be included in the laboratory environmental management plan?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... management of laboratory wastes and from the reuse, recycling or disposal of such materials outside the... for the purpose of supporting continual improvement of the Environmental Management Plan. (iii...

  12. 40 CFR 262.105 - What must be included in the laboratory environmental management plan?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... management of laboratory wastes and from the reuse, recycling or disposal of such materials outside the... for the purpose of supporting continual improvement of the Environmental Management Plan. (iii...

  13. 40 CFR 262.105 - What must be included in the laboratory environmental management plan?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... management of laboratory wastes and from the reuse, recycling or disposal of such materials outside the... for the purpose of supporting continual improvement of the Environmental Management Plan. (iii...

  14. 34 CFR 299.2 - What general administrative regulations apply to ESEA programs?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... programs under title III of the Goals 2000: Educate America Act (title III of Goals 2000), unless a State...). Note: To meet the first of the three standards, alternative State provisions must, among other things...

  15. A Second Year Evaluation of the ESEA Title III Urban Leadership Program.

    ERIC Educational Resources Information Center

    Frerichs, Allen H.

    The Urban Leadership Program, funded under Title III of the Elementary and Secondary Education Act, was carried out among sixth graders at the Albert Einstein School in Chicago, Illinois. The primary purpose of the program was to develop skills and competence to prepare participants for survival and success in a large urban environment. A…

  16. Oregon Small Schools Program: A Title III Project. Independent Evaluation Report, 1972.

    ERIC Educational Resources Information Center

    Miller, Donald F.

    An Elementary and Secondary Education Act (ESEA) Title III project, the 1971-72 Oregon Small Schools Program (OSSP) objectives were (1) to increase member schools receptivity to new and better ideas in education; (2) to implement new programs and apply new techniques consistent with the Oregon Board of Education priority objectives and with the…

  17. A Study of the Education Professions Development Act Training Programs for Higher Education Personnel, Volume III: The EPDA V-E Training Programs. Final Report.

    ERIC Educational Resources Information Center

    Boyle, E.; Carlson, K.

    Volume III of a study of the Education Professions Development Act (EPDA) training programs for higher education personnel presents the second of a three-faceted approach to assess current needs. This document reviews the task of profiling EPDA V-E training programs to produce a small-scale information system. Section one reviews the profiling…

  18. Transparent aligners: An invisible approach to correct mild skeletal class III malocclusion

    PubMed Central

    Yezdani, A. Arif

    2015-01-01

    This case report highlights the treatment of a mild skeletal class III malocclusion with an invisible thermoplastic retainer. A 15-year-old female patient presented with a mild skeletal class III malocclusion with a retrognathic maxilla, orthognathic mandible, a low mandibular plane angle with Angle's class III malocclusion with maxillary lateral incisors in anterior cross-bite with crowding of maxillary anteriors, imbricated and rotated mandibular incisors and deep bite. Accurate upper and lower impressions and a bite registration were taken with polyvinyl siloxane rubber base impression material. This was then sent to the lab for the processing of a series of ClearPath aligners. The ClearPath virtual set-up sent from the lab provided the treatment plan and interproximal reduction estimation complete with posttreatment results. This enabled the clinician to actively participate in the treatment plan and provide the necessary suggestions. The ClearPath three-dimensional aligner was found to have effectively corrected the anterior cross-bite and crowding of the maxillary anteriors. PMID:26015738

  19. 38. Photograph of a line drawing. 'PART III, SECTION 1, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. Photograph of a line drawing. 'PART III, SECTION 1, EQUIPMENT LAYOUT, BUILDINGS G-1 TO G-10 INCL., PURIFICATION, MANUFACTURING AREA, PLAN 'B'.' From U.S. Army Corps of Engineers. Industrial Facilities Inventory, Holston Ordnance Works, Kingsport, Tennessee. Plant B, Parts II, III. (Nashville, TN: Office of District Engineer, 1944). - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN

  20. Planning the data transition of a VLDB: a case study

    NASA Astrophysics Data System (ADS)

    Finken, Shirley J.

    1997-02-01

    This paper describes the technical and programmatic plans for moving and checking certain data from the IDentification Automated Services (IDAS) system to the new Interstate Identification Index/Federal Bureau of Investigation (III/FBI) Segment database--one of the three components of the Integrated Automated Fingerprint Identification System (IAFIS) being developed by the Federal Bureau of Investigation, Criminal Justice Information Services Division. Transitioning IDAS to III/FBI includes putting the data into an entirely new target database structure (i.e. from IBM VSAM files to ORACLE7 RDBMS tables). Only four IDAS files were transitioned (CCN, CCR, CCA, and CRS), but their total estimated size is at 500 Gb of data. Transitioning of this Very Large Database is planned as two processes.

  1. SELENIUM TREATMENT/REMOVAL ALTERNATIVES DEMONSTRATION PROJECT - MINE WASTE TECHNOLOGY PROGRAM ACTIVITY III, PROJECT 20

    EPA Science Inventory

    This document is the final report for EPA's Mine WAste Technology Program (MWTP) Activity III, Project 20--Selenium Treatment/Removal Alternatives Demonstration project. Selenium contamination originates from many sources including mining operations, mineral processing, abandoned...

  2. 40 CFR 300.200 - General.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... and Preparedness § 300.200 General. This subpart summarizes emergency preparedness activities relating... local emergency preparedness activities under SARA Title III, also known as the “Emergency Planning and... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SUPERFUND, EMERGENCY PLANNING, AND...

  3. 42 CFR 423.128 - Dissemination of Part D plan information.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... plan sponsor's toll free customer service line or by accessing the plan sponsor's internet Web site. (8... redetermination processes via an Internet Web site; and (iii) A system that transmits codes to network pharmacies...— (1) A toll-free customer call center that— (i) Is open during usual business hours. (ii) Provides...

  4. 17 CFR 230.428 - Documents constituting a section 10(a) prospectus for Form S-8 registration statement...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... employee benefit plan information required by Item 1 of the Form; (ii) The statement of availability of registrant information, employee benefit plan annual reports and other information required by Item 2; and (iii) The documents containing registrant information and employee benefit plan annual reports that are...

  5. Preparing for the Future of the Workplace. Volume III: Planning Materials for Educators.

    ERIC Educational Resources Information Center

    Markley, O. W., Ed.

    This volume is the third of three reporting research that is intended to help postsecondary occupational education deans and directors become able to plan more strategically for using new instructional technologies to meet emerging needs. "Planning to Use Emerging Instructional Technologies: Some Useful Methods and Guidelines" (O. W.…

  6. A Functional Plan for an Illinois Library Telecommunications Network. The Final Report.

    ERIC Educational Resources Information Center

    Calabrese, Alice; And Others

    This final report describes the plan developed by the Northern Illinois Learning Resources Cooperative, a consortium of 44 community colleges and other academic institutions, which was awarded a Library Services and Construction Act (LSCA) Title III planning grant to research the requirements for a statewide electronic network that would provide…

  7. Automated Planning Enables Complex Protocols on Liquid-Handling Robots.

    PubMed

    Whitehead, Ellis; Rudolf, Fabian; Kaltenbach, Hans-Michael; Stelling, Jörg

    2018-03-16

    Robotic automation in synthetic biology is especially relevant for liquid handling to facilitate complex experiments. However, research tasks that are not highly standardized are still rarely automated in practice. Two main reasons for this are the substantial investments required to translate molecular biological protocols into robot programs, and the fact that the resulting programs are often too specific to be easily reused and shared. Recent developments of standardized protocols and dedicated programming languages for liquid-handling operations addressed some aspects of ease-of-use and portability of protocols. However, either they focus on simplicity, at the expense of enabling complex protocols, or they entail detailed programming, with corresponding skills and efforts required from the users. To reconcile these trade-offs, we developed Roboliq, a software system that uses artificial intelligence (AI) methods to integrate (i) generic formal, yet intuitive, protocol descriptions, (ii) complete, but usually hidden, programming capabilities, and (iii) user-system interactions to automatically generate executable, optimized robot programs. Roboliq also enables high-level specifications of complex tasks with conditional execution. To demonstrate the system's benefits for experiments that are difficult to perform manually because of their complexity, duration, or time-critical nature, we present three proof-of-principle applications for the reproducible, quantitative characterization of GFP variants.

  8. 7 CFR 42.111 - Sampling plans for reduced condition of container inspection, Tables III and III-A; and limit...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Agriculture Regulations of the Department of Agriculture AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE COMMODITY STANDARDS AND STANDARD CONTAINER REGULATIONS STANDARDS FOR CONDITION OF FOOD CONTAINERS Procedures for Stationary Lot Sampling and Inspection...

  9. PROCEEDINGS OF THE DELMARVA COASTAL BAYS CONFERENCE III: TRI-STATE APPROACHES TO PRESERVING AQUATIC RESOURCES

    EPA Science Inventory

    On November 12-13, 1999, Approximately 300 people attended the Delmarva Coastal Bays Conference III: Tri-State Approaches to Preserving Aquatic Resources (CBCIII). The conference was organized by the Assateague Coastal Trust with planning and financial assistance from twenty-one ...

  10. Biodiesel Test Plan

    DTIC Science & Technology

    2014-07-01

    Biodiesel Test Plan Distribution Statement A: Approved for Public Release; distribution is unlimited. July 2014 Report No. CG-D-07-14...Appendix C) Biodiesel Test Plan ii UNCLAS//Public | CG-926 R&DC | G. W. Johnson, et al. Public | July 2014 N O T I C E This...Development Center 1 Chelsea Street New London, CT 06320 Biodiesel Test Plan iii UNCLAS//Public | CG-926 R&DC | G. W. Johnson, et al

  11. Accuracy of Dolphin visual treatment objective (VTO) prediction software on class III patients treated with maxillary advancement and mandibular setback.

    PubMed

    Peterman, Robert J; Jiang, Shuying; Johe, Rene; Mukherjee, Padma M

    2016-12-01

    Dolphin® visual treatment objective (VTO) prediction software is routinely utilized by orthodontists during the treatment planning of orthognathic cases to help predict post-surgical soft tissue changes. Although surgical soft tissue prediction is considered to be a vital tool, its accuracy is not well understood in tow-jaw surgical procedures. The objective of this study was to quantify the accuracy of Dolphin Imaging's VTO soft tissue prediction software on class III patients treated with maxillary advancement and mandibular setback and to validate the efficacy of the software in such complex cases. This retrospective study analyzed the records of 14 patients treated with comprehensive orthodontics in conjunction with two-jaw orthognathic surgery. Pre- and post-treatment radiographs were traced and superimposed to determine the actual skeletal movements achieved in surgery. This information was then used to simulate surgery in the software and generate a final soft tissue patient profile prediction. Prediction images were then compared to the actual post-treatment profile photos to determine differences. Dolphin Imaging's software was determined to be accurate within an error range of +/- 2 mm in the X-axis at most landmarks. The lower lip predictions were most inaccurate. Clinically, the observed error suggests that the VTO may be used for demonstration and communication with a patient or consulting practitioner. However, Dolphin should not be useful for precise treatment planning of surgical movements. This program should be used with caution to prevent unrealistic patient expectations and dissatisfaction.

  12. Assessing the robustness of passive scattering proton therapy with regard to local recurrence in stage III non-small cell lung cancer: a secondary analysis of a phase II trial.

    PubMed

    Zhu, Zhengfei; Liu, Wei; Gillin, Michael; Gomez, Daniel R; Komaki, Ritsuko; Cox, James D; Mohan, Radhe; Chang, Joe Y

    2014-05-06

    We assessed the robustness of passive scattering proton therapy (PSPT) plans for patients in a phase II trial of PSPT for stage III non-small cell lung cancer (NSCLC) by using the worst-case scenario method, and compared the worst-case dose distributions with the appearance of locally recurrent lesions. Worst-case dose distributions were generated for each of 9 patients who experienced recurrence after concurrent chemotherapy and PSPT to 74 Gy(RBE) for stage III NSCLC by simulating and incorporating uncertainties associated with set-up, respiration-induced organ motion, and proton range in the planning process. The worst-case CT scans were then fused with the positron emission tomography (PET) scans to locate the recurrence. Although the volumes enclosed by the prescription isodose lines in the worst-case dose distributions were consistently smaller than enclosed volumes in the nominal plans, the target dose coverage was not significantly affected: only one patient had a recurrence outside the prescription isodose lines in the worst-case plan. PSPT is a relatively robust technique. Local recurrence was not associated with target underdosage resulting from estimated uncertainties in 8 of 9 cases.

  13. International Space Programs. Aerospace Education III.

    ERIC Educational Resources Information Center

    Air Univ., Maxwell AFB, AL. Junior Reserve Office Training Corps.

    This curriculum guide is prepared for the Aerospace Education III series publication entitled "International Space Programs." The guide is organized according to specific chapters in the textbook. It provides guidelines for teachers in terms of objectives, behavioral objectives, suggested outlines, orientation, suggested key points,…

  14. Katimavik Participant's Manual, Book III, Work Skills = Katimavik manuel du participant, cahier III, les techniques de travail.

    ERIC Educational Resources Information Center

    Crelinsten, Michael, Ed.

    Part of the documentation for Katimavik, a nine-month volunteer community service and learning program for 17 to 21-year-old Canadians, the bilingual student manual focuses on the work skills portion of the learning program. The manual includes learning program objectives, trimester guidelines and a checklist for activity participation, optional…

  15. 78 FR 54200 - Virginia: Final Authorization of State Hazardous Waste Management Program Revisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-03

    ... take effect. We will then respond to public comments in a later final rule based on this proposal. You... Programs, U.S. EPA Region III, 1650 Arch Street, Philadelphia, PA 19103-2029. 4. Hand Delivery: At the... 3LC50, Office of State Programs, U.S. EPA Region III, 1650 Arch Street, Philadelphia, PA 19103-2029...

  16. The Biennial Report to Congress on the Implementation of the Title III State Formula Grant Program: School Years 2008-10

    ERIC Educational Resources Information Center

    Office of English Language Acquisition, US Department of Education, 2013

    2013-01-01

    This is the fourth biennial report to Congress on the implementation of the "Elementary and Secondary Education Act's" Title III State Formula Grant Program (also known as the English Language Acquisition State Grants Program). This report provides information reported by states to the U.S. Department of Education regarding services…

  17. The Biennial Report to Congress on the Implementation of the Title III State Formula Grant Program: School Years 2006-08

    ERIC Educational Resources Information Center

    Office of English Language Acquisition, US Department of Education, 2012

    2012-01-01

    This is the third biennial report to Congress on the implementation of the "Elementary and Secondary Education Act's" Title III State Formula Grant Program (also known as the English Language Acquisition State Grants Program). This report provides information regarding the U.S. Department of Education's efforts to hold states accountable…

  18. 2006 NASA Seal/Secondary Air System Workshop; Volume 1

    NASA Technical Reports Server (NTRS)

    Steinetz, Bruce, M. (Editor); Hendricks, Robert C. (Editor); Delgado, Irebert (Editor)

    2007-01-01

    The 2006 NASA Seal/Secondary Air System workshop covered the following topics: (i) Overview of NASA s new Exploration Initiative program aimed at exploring the Moon, Mars, and beyond; (ii) Overview of NASA s new fundamental aeronautics technology project; (iii) Overview of NASA Glenn Research Center s seal project aimed at developing advanced seals for NASA s turbomachinery, space, and reentry vehicle needs; (iv) Reviews of NASA prime contractor, vendor, and university advanced sealing concepts including tip clearance control, test results, experimental facilities, and numerical predictions; and (v) Reviews of material development programs relevant to advanced seals development. Turbine engine studies have shown that reducing seal leakages as well as high-pressure turbine (HPT) blade tip clearances will reduce fuel burn, lower emissions, retain exhaust gas temperature margin, and increase range. Several organizations presented development efforts aimed at developing faster clearance control systems and associated technology to meet future engine needs. The workshop also covered several programs NASA is funding to develop technologies for the Exploration Initiative and advanced reusable space vehicle technologies. NASA plans on developing an advanced docking and berthing system that would permit any vehicle to dock to any on-orbit station or vehicle. Seal technical challenges (including space environments, temperature variation, and seal-on-seal operation) as well as plans to develop the necessary "androgynous" seal technologies were reviewed. Researchers also reviewed seal technologies employed by the Apollo command module that serve as an excellent basis for seals for NASA s new Crew Exploration Vehicle (CEV).

  19. INTEGRATING HEALTH TECHNOLOGY ASSESSMENT PRINCIPLES IN FORMULARY MANAGEMENT.

    PubMed

    Teng, Monica; Khoo, Ai Leng; Zhao, Ying Jiao; Lin, Liang; Lim, Boon Peng

    2016-01-01

    Effective formulary management in healthcare institutions safeguards rational drug use and optimizes health outcomes. We implemented a formulary management program integrating the principles of health technology assessment (HTA) to improve the safe, appropriate, and cost-effective use of medicine in Singapore. A 3-year formulary management program was initiated in 2011 in five public healthcare institutions. This program was managed by a project team comprising HTA researchers. The project team worked with institutional pharmacy and therapeutics (P&T) committees to: (i) develop tools for formulary drug review and decision making; (ii) enhance the HTA knowledge and skills of formulary pharmacists and members of P&T committees; (iii) devise a prioritization framework to overcome resource constraints and time pressure; and (iv) conceptualize and implement a framework to review existing formulary. Tools that facilitate drug request submission, drug review, and decision making were developed for formulary drug inclusion. A systematic framework to review existing formulary was also developed and tested in selected institutions. A competency development plan was rolled out over 2 years to enhance formulary pharmacists' proficiency in systematic literature search and review, meta-analysis, and pharmacoeconomic evaluation. The plan comprised training workshops and on-the-job knowledge transfer between the project team and institutional formulary pharmacists through collaborating on selected drug reviews. A resource guide that consolidated the tools and templates was published to encourage the adoption of best practices in formulary management. Based on the concepts of HTA, we implemented an evidence-based approach to optimize formulary management.

  20. 28 CFR 70.25 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Revision of budget and program plans. 70... Revision of budget and program plans. (a) The budget plan is the financial expression of the project or... from budget and program plans, and request prior approvals for budget and program plan revisions, in...

  1. 45 CFR 2543.25 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 4 2010-10-01 2010-10-01 false Revision of budget and program plans. 2543.25... Revision of budget and program plans. (a) The budget plan is the financial expression of the project or... deviations from budget and program plans, and request prior approvals for budget and program plan revisions...

  2. DRDC Support to Exercise Cyber Storm III

    DTIC Science & Technology

    2011-10-01

    d’intervention fédéraux portant sur les incidents cybernétiques sont encore relativement peu élaborés et insuffisamment développés et un examen des plans examinés...9 2.7 CSIII Ethics Protocol...30 Annex C .. Exercise Cyber Storm III Ethics

  3. ANNUAL RADIOACTIVE WASTE TANK INSPECTION PROGRAM- 2007

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    West, B; Ruel Waltz, R

    2008-06-05

    Aqueous radioactive wastes from Savannah River Site (SRS) separations and vitrification processes are contained in large underground carbon steel tanks. The 2007 inspection program revealed that the structural integrity and waste confinement capability of the Savannah River Site waste tanks were maintained. A very small amount of material had seeped from Tank 12 from a previously identified leaksite. The material observed had dried on the tank wall and did not reach the annulus floor. A total of 5945 photographs were made and 1221 visual and video inspections were performed during 2007. Additionally, ultrasonic testing was performed on four Waste Tanksmore » (15, 36, 37 and 38) in accordance with approved inspection plans that met the requirements of WSRC-TR-2002- 00061, Revision 2 'In-Service Inspection Program for High Level Waste Tanks'. The Ultrasonic Testing (UT) In-Service Inspections (ISI) are documented in a separate report that is prepared by the ISI programmatic Level III UT Analyst. Tanks 15, 36, 37 and 38 are documented in 'Tank Inspection NDE Results for Fiscal Year 2007'; WSRC-TR-2007-00064.« less

  4. 142. ARAIII General plan of GCRE area, including electrical distribution ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    142. ARA-III General plan of GCRE area, including electrical distribution plan for power and lighting. Includes detail of floodlight and security lighting poles and fixtures. Aerojet-general 880-area/GCRE-406-1. Date: February 1958. Ineel index code no. 063-0406-00-013-102539. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  5. 26 CFR 1.401(a)(4)-6 - Contributory defined benefit plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... (b)(2)(ii)(A) merely because it eliminates employee contributions for all employees with plan year...) In general. A contributory DB plan satisfies this paragraph (b)(2)(ii)(B) if it satisfies either of... employee's base benefit percentage as required under paragraph (b)(2)(iii)(B)(1) of this section, it may be...

  6. 76 FR 6812 - Proposed Shiloh III Wind Plant Project, Solano County, CA; Proposed Habitat Conservation Plan and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-08

    ... turbines and associated facilities and access roads, maintenance of the wind turbines and associated... Area). The Plan Area is adjacent to existing energy-producing facilities, most notably wind turbine.../California Independent System Operator power grid. Up to 59 wind turbines would be built in the Plan Area...

  7. 42 CFR 423.464 - Coordination of benefits with other providers of prescription drug coverage.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... per capita basis) for Part D eligible individuals enrolled in the Part D plan and the SPAP or entity... Part D eligible individuals; (ii) Provides assistance to Part D eligible individuals in all Part D plans without discriminating based upon the Part D plan in which an individual enrolls; (iii) Meets the...

  8. 25 CFR 47.10 - How is the local educational financial plan developed?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... notes any problem with the plan, he or she must: (i) Notify the local board and local supervisor of the problem within two weeks of receiving the plan; (ii) Make arrangements to assist the local school supervisor and board to correct the problem; and (iii) Refer the problem to the Director of the Office of...

  9. 78 FR 73769 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Approval of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-09

    ..., contingency measures, and other planning SIPs related to the attainment of either the 1997 annual or 2006 24... contingency measures, with a schedule for implementation, as EPA deems necessary to assure prompt correction... continued attainment; and (5) a contingency plan to prevent or correct future violations of the NAAQS. III...

  10. 26 CFR 1.346-1 - Partial liquidation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... pursuant to section 346(b) if it consists of the proceeds of the sale of the assets of a trade or business... redemption of all of the stock of the corporation pursuant to a plan of complete liquidation, or (2) The... the corporation pursuant to a plan, and (iii) Occurs within the taxable year in which the plan is...

  11. Control of lower incisor inclination with a completely customized lingual appliance for dentoalveolar compensation of class III malocclusion.

    PubMed

    Lossdörfer, Stefan; Schwestka-Polly, Rainer; Wiechmann, Dirk

    2013-09-01

    Bracket slots and orthodontic archwires offering high dimensional precision are needed for fully customized lingual appliances. We aimed to investigate whether high-precision appliances of this type enable dentoalveolar compensation of class III malocclusion so that lower incisor inclination at the end of treatment will closely match the anticipated situation as defined in a pretreatment setup. This retrospective study included a total of 34 consecutive patients who had worn a fully customized lingual appliance to achieve dentoalveolar compensation for class III malocclusion by intermaxillary elastics, or proximal enamel reduction, or extraction of teeth in one or both jaws. Casts fabricated at different points in time were three-dimensionally scanned to analyze how precisely the lower incisor inclinations envisioned in the setup were implemented in clinical practice. Aside from minor deviations of ±3.75°, the lower incisor inclinations were clinically implemented as planned even in patients with major sagittal discrepancies. Treatment goals predefined in a setup of dentoalveolar compensation for class III malocclusion can be very precisely achieved via a customized lingual appliance. Correct planning can prevent undesirable lingual tipping of the lower incisors. This finding should not encourage a more liberal use of dentoalveolar compensation, but it should heighten clinicians' awareness of how essential it is to sufficiently consider the individual anatomy of the dentoalveolar complex during treatment planning.

  12. 76 FR 52658 - State Program Requirements; Approval of Application for Program Revision to the National...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-23

    ... (ADEC) in four phases. Phases I-III have been transferred from the EPA to ADEC. In March 2011, ADEC made a submission for approval for a one year extension of the transfer of Phase IV of the APDES program... facilities not previously transferred in Phases I-III. The EPA approved the one year extension for Phase IV...

  13. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... projects of the Plan, including pilot projects and operational elements, based on the best scientific... Florida Water Management District shall also consult with the South Florida Ecosystem Restoration Task...; (ii) Information obtained from pilot projects; (iii) Updated funding information; (iv) Approved...

  14. Final Report: Pilot Region-Based Optimization Program for Fund-Lead Sites, EPA Region III

    EPA Pesticide Factsheets

    This report describes a pilot study for a Region-based optimization program, implemented by a Regional Optimization Evaluation Team (ROET) that was conducted in U.S. EPA Region III at Fund-lead sites with pump-and-treat (P&T) systems.

  15. 45 CFR 309.35 - What are the procedures for review of a Tribal IV-D program application, plan or plan amendment?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...-D program application, plan or plan amendment? 309.35 Section 309.35 Public Welfare Regulations... ENFORCEMENT (IV-D) PROGRAM Tribal IV-D Program Application Procedures § 309.35 What are the procedures for review of a Tribal IV-D program application, plan or plan amendment? (a) The Secretary will promptly...

  16. Phase III Simplified Integrated Test (SIT) results - Space Station ECLSS testing

    NASA Technical Reports Server (NTRS)

    Roberts, Barry C.; Carrasquillo, Robyn L.; Dubiel, Melissa Y.; Ogle, Kathryn Y.; Perry, Jay L.; Whitley, Ken M.

    1990-01-01

    During 1989, phase III testing of Space Station Freedom Environmental Control and Life Support Systems (ECLSS) began at Marshall Space Flight Center (MSFC) with the Simplified Integrated Test. This test, conducted at the MSFC Core Module Integration Facility (CMIF), was the first time the four baseline air revitalization subsystems were integrated together. This paper details the results and lessons learned from the phase III SIT. Future plans for testing at the MSFC CMIF are also discussed.

  17. Development of a self-treatment approach for patients with COPD and comorbidities: an ongoing learning process.

    PubMed

    Effing, Tanja W; Lenferink, Anke; Buckman, Julie; Spicer, Deborah; Cafarella, Paul A; Burt, Morton G; Bassett, Katherine L; van Ommeren, Clara; Anesbury, Sally; van der Valk, Paul D L P M; Frith, Peter A; van der Palen, Job

    2014-11-01

    Patient-initiated action plans are an important component of COPD self-management (SM) interventions. When integrated into SM interventions, these action plans have proven to be effective in reducing exacerbation severity, hospitalisations, and costs and in improving health status in patients with COPD without severe comorbidities. Because of overlap in symptoms, a self-treatment (ST) approach that focuses solely on traditional symptoms of COPD is inadequate for patients with COPD and comorbidities. The COPE-III SM intervention combines (I) patient-initiated action plans that are tailored to the individual's co-morbid disease(s), and (II) ongoing nurse support. In this paper we provide information regarding the integration of information from two previous COPD SM studies (COPE I and II) in the development of the current COPE-III ST approach. COPE-III ST materials include daily symptom diaries and action plans that take patient's common comorbidities [chronic heart failure (CHF), anxiety, depression, ischaemic heart disease (IHD), and diabetes] into account. The comorbid diary and action plans components were developed in collaboration with multiple disease-experts. Previous SM studies have highlighted some essential topics that need to be considered when developing a SM or ST approach: 'when to initiate ST', 'how to optimize materials and safety', and 'how to achieve behavioural change'. In the COPE-III study, ST is initiated after a significant change in symptoms. This is consistent with the COPE-II approach and was implemented because disease symptoms are often present even when patients are stable. We have tried to ensure patient safety by providing an easily accessible case-manager to patients throughout their involvement in the study. Furthermore, a psychologist has ensured the use of behavioural change techniques throughout the intervention. We should continue to learn from our experiences with SM interventions to further optimize future SM and ST interventions. The use of materials that are suitable for different levels of patient literacy and the training of health care providers are other points of improvement.

  18. Program Planning in Health Professions Education

    ERIC Educational Resources Information Center

    Schmidt, Steven W.; Lawson, Luan

    2018-01-01

    In this chapter, the major concepts from program planning in adult education will be applied to health professions education (HPE). Curriculum planning and program planning will be differentiated, and program development and planning will be grounded in a systems thinking approach.

  19. Traffic Pattern Detection Using the Hough Transformation for Anomaly Detection to Improve Maritime Domain Awareness

    DTIC Science & Technology

    2013-12-01

    Programming code in the Python language used in AIS data preprocessing is contained in Appendix A. The MATLAB programming code used to apply the Hough...described in Chapter III is applied to archived AIS data in this chapter. The implementation of the method, including programming techniques used, is...is contained in the second. To provide a proof of concept for the algorithm described in Chapter III, the PYTHON programming language was used for

  20. 78 FR 18325 - Defense Transportation Regulation, Part IV

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ... received in connection with the Defense Personal Property Program (DP3) Phase III Direct Procurement Method... at http://www.transcom.mil/dtr/part-iv/phaseiii.cfm (DPM SECTION). All identified changes will be... Defense Personal Property System (DPS) Phase III programming projected for FY17. FOR FURTHER INFORMATION...

  1. 76 FR 36095 - Defense Transportation Regulation, Part IV

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-21

    ... with the Defense Personal Property Program (DP3) Phase III Domestic Small Shipments (dS2) and... Regulation, Part IV Web site at http://www.transcom.mil/dtr/part-iv/phaseiii.cfm . All identified changes... based on completion of Defense Personal Property System (DPS) Phase III programming projected for FY15...

  2. Software Reviews: Programs Worth a Second Look.

    ERIC Educational Resources Information Center

    Classroom Computer Learning, 1989

    1989-01-01

    Reviewed are three computer software programs: (1) "World GeoGraph"--geography, discovery tool, grades 6-12, Apple IIGS; (2) "Grammatik III"--language arts, grade 7-adult, IBM, PS/2, Tandy 1000; (3) "Words & Concepts I, II, III"--language and concept training for special education, age 3-9, Apple II with speech…

  3. 75 FR 27538 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-17

    ... Paperwork Reduction Act (44 U.S.C. Chapter 35). Agency: Green Technology Pilot Program. Form Number(s): PTO... Examination Pilot Program for Green Technologies, (ii) the public may protest a pending application, and (iii...'s Obligation: Required to obtain or retain benefits. OMB Desk Officer: Nicholas A. Fraser, e-mail...

  4. 76 FR 67764 - Finance, Budget & Program Committee Board of Directors Meeting; Sunshine Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... NEIGHBORHOOD REINVESTMENT CORPORATION Finance, Budget & Program Committee Board of Directors..., Assistant Corporate Secretary (202) 220-2376; [email protected] . Agenda: I. Call To Order II. Executive Session III. Financial Report III. Budget Report IV. Lease Update V. Corporate Scorecard VI. NFMC & EHLP VII...

  5. STEM Outreach to the African Canadian Community - The Imhotep Legacy Academy

    NASA Astrophysics Data System (ADS)

    Hewitt, Kevin

    2012-02-01

    Like the African American community in the US, the African Canadian community is underrepresented in the Science Technology Engineering and Mathematics (STEM) fields. To serve these communities two outreach organizations emerged in Canadian cities where there is a critical mass of learners of African Descent - Toronto and Halifax. I will describe the Imhotep's Legacy Academy, which began in the Physics labs of Dalhousie University in Halifax, Nova Scotia and has grown to a province-wide program serving three-quarters of the school boards in the province with an annual budget that has grown to 400,000 in 2011-12. It follows the learner from the time they enter grade 7 to the time they graduate from university, through three programs: (a) Weekly After-School science enrichment for junior high learners, (b) Virtual High school tutoring program and (c) Summer student internships and research scholarships for post-secondary students. This year, the program was the beneficiary of funding from TD Bank to establish scholarships for program participants to enter Dalhousie university. Modeled on the Meyerhoff scholarships the program participants are identified at an early stage and are promised a subset of funding as they meet selected criteria during participation in the program. The program enjoys support from the Department of Education and the highest levels of government. A tri-mentoring system exists where faculty of African descent train mentors, who are science students of African descent at associated universities, to deliver hands-on enrichment activities to learners of African Descent. Evidence supporting the success of the program will be highlighted. Project outcomes measured include (i) recruitment; (ii) attendance; (iii) stakeholder relationships; (iv) programming; (v) staff training; (vi) perception of ILASP's value; (vii) academic performance. The end results are new lessons and best practices that are incorporated into a strategic plan for the new project year. Teachers perceived that ILASP had a positive ripple effect on the entire academic and non-academic educational experience of the learners, crediting the project with (i) encouraging self-learning; (ii) assisting in honing learners' science and math skills; (iii) developing core skills that were applicable in learners' schoolwork; (iv) boosting learners' self-esteem; (v) improving school attendance; (vi) boosting learners' motivation to be engaged participants in all other classes.

  6. In Search of the True Universe

    NASA Astrophysics Data System (ADS)

    Harwit, Martin

    2014-01-01

    1. The nineteenth century's last five years; Part I. The Import of Theoretical Tools: 2. An overview; 3. Conclusions based on principles; 4. Conclusions based on a premise; 5. Conclusions based on calculations; 6. Asking the right questions, accepting limited answers; Part II. A National Plan Shaping the Universe We Perceive: 7. A new order and the new universe it produced; 8. Where did the chemical elements arise?; 9. Landscapes; 10. The evolution of astrophysical theory after 1960; 11. Turmoils of leadership; 12. Cascades and shocks that shape astrophysics; 13. Astrophysical discourse and persuasion; Part III. The Cost of Discerning the True Universe: 14. Organization and functioning of the astronomical community; 15. Language and astrophysical stability; 16. An economically viable astronomical program; Epilogue.

  7. In Search of the True Universe

    NASA Astrophysics Data System (ADS)

    Harwit, Martin

    2013-11-01

    1. The nineteenth century's last five years; Part I. The Import of Theoretical Tools: 2. An overview; 3. Conclusions based on principles; 4. Conclusions based on a premise; 5. Conclusions based on calculations; 6. Asking the right questions, accepting limited answers; Part II. A National Plan Shaping the Universe We Perceive: 7. A new order and the new universe it produced; 8. Where did the chemical elements arise?; 9. Landscapes; 10. The evolution of astrophysical theory after 1960; 11. Turmoils of leadership; 12. Cascades and shocks that shape astrophysics; 13. Astrophysical discourse and persuasion; Part III. The Cost of Discerning the True Universe: 14. Organization and functioning of the astronomical community; 15. Language and astrophysical stability; 16. An economically viable astronomical program; Epilogue.

  8. Optimisation in radiotherapy. III: Stochastic optimisation algorithms and conclusions.

    PubMed

    Ebert, M

    1997-12-01

    This is the final article in a three part examination of optimisation in radiotherapy. Previous articles have established the bases and form of the radiotherapy optimisation problem, and examined certain types of optimisation algorithm, namely, those which perform some form of ordered search of the solution space (mathematical programming), and those which attempt to find the closest feasible solution to the inverse planning problem (deterministic inversion). The current paper examines algorithms which search the space of possible irradiation strategies by stochastic methods. The resulting iterative search methods move about the solution space by sampling random variates, which gradually become more constricted as the algorithm converges upon the optimal solution. This paper also discusses the implementation of optimisation in radiotherapy practice.

  9. 7 CFR 766.110 - Conservation Contract.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... floodplains; (iii) Areas of high water quality or scenic value; (iv) Historic or cultural properties listed in..., or 50 years. (e) Conservation management plan. The Agency, through the recommendations of the Conservation Contract review team, is responsible for approving the conservation management plan. (f...

  10. 48 CFR 310.001 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PLANNING MARKET RESEARCH § 310.001 Policy. (a) OPDIVs are encouraged to conduct market research, to the..., or business information for project planning purposes regarding existing or potential solutions. In...) Exclude small business concerns. (iii) While not the primary intent of a Sources Sought notice, in...

  11. 7 CFR 766.110 - Conservation Contract.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... floodplains; (iii) Areas of high water quality or scenic value; (iv) Historic or cultural properties listed in..., or 50 years. (e) Conservation management plan. The Agency, through the recommendations of the Conservation Contract review team, is responsible for approving the conservation management plan. (f...

  12. 24 CFR 91.320 - Action plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... and transitional housing needs of homeless persons; (iii) Helping homeless persons (especially... recently homeless from becoming homeless again; and (iv) Helping low-income individuals and families avoid..., employment, education, or youth needs. (2) The State must specify the activities that it plans to undertake...

  13. 24 CFR 91.320 - Action plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... and transitional housing needs of homeless persons; (iii) Helping homeless persons (especially... recently homeless from becoming homeless again; and (iv) Helping low-income individuals and families avoid..., employment, education, or youth needs. (2) The State must specify the activities that it plans to undertake...

  14. 24 CFR 91.320 - Action plan.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... and transitional housing needs of homeless persons; (iii) Helping homeless persons (especially... recently homeless from becoming homeless again; and (iv) Helping low-income individuals and families avoid..., employment, education, or youth needs. (2) The State must specify the activities that it plans to undertake...

  15. 40 CFR Appendix III to Part 92 - Smoke Standards for Non-Normalized Measurements

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Pt. 92, App. III Appendix III to Part 92—Smoke Standards for Non-Normalized Measurements Table III-1—Equivalent... 40 Protection of Environment 21 2013-07-01 2013-07-01 false Smoke Standards for Non-Normalized...

  16. 40 CFR Appendix III to Part 92 - Smoke Standards for Non-Normalized Measurements

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Pt. 92, App. III Appendix III to Part 92—Smoke Standards for Non-Normalized Measurements Table III-1—Equivalent... 40 Protection of Environment 20 2011-07-01 2011-07-01 false Smoke Standards for Non-Normalized...

  17. 40 CFR Appendix III to Part 92 - Smoke Standards for Non-Normalized Measurements

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Pt. 92, App. III Appendix III to Part 92—Smoke Standards for Non-Normalized Measurements Table III-1—Equivalent... 40 Protection of Environment 21 2012-07-01 2012-07-01 false Smoke Standards for Non-Normalized...

  18. 40 CFR Appendix III to Part 92 - Smoke Standards for Non-Normalized Measurements

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Pt. 92, App. III Appendix III to Part 92—Smoke Standards for Non-Normalized Measurements Table III-1—Equivalent... 40 Protection of Environment 20 2014-07-01 2013-07-01 true Smoke Standards for Non-Normalized...

  19. 40 CFR Appendix III to Part 92 - Smoke Standards for Non-Normalized Measurements

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) AIR PROGRAMS (CONTINUED) CONTROL OF AIR POLLUTION FROM LOCOMOTIVES AND LOCOMOTIVE ENGINES Pt. 92, App. III Appendix III to Part 92—Smoke Standards for Non-Normalized Measurements Table III-1—Equivalent... 40 Protection of Environment 20 2010-07-01 2010-07-01 false Smoke Standards for Non-Normalized...

  20. 77 FR 28264 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Ohio; Determination...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-14

    ... Division, U.S. Environmental Protection Agency, Region III, 1650 Arch Street, Philadelphia, Pennsylvania..., Environmental Protection Agency, Region III, 1650 Arch Street, Philadelphia, PA 19103-2023. The telephone [email protected] . SUPPLEMENTARY INFORMATION: I. What action is EPA taking? II. What is the effect of this...

  1. 76 FR 71450 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia; Determination of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-18

    ..., Region III, 1650 Arch Street, Philadelphia, Pennsylvania 19103. FOR FURTHER INFORMATION CONTACT: Asrah... EPA taking? II. What is the effect of this action? III. Statutory and Executive Order Reviews I. What... discussion of the rationale behind this determination and the effect of the determination were included in...

  2. Feasibility planning study for a behavior database. Volume III Appendix B, Compendium of survey questions on drinking and driving and occupant restraints

    DOT National Transportation Integrated Search

    1987-04-01

    The general objective of the project was to determine the feasibility of and the general requirements for a centralized database on driver behavior and attitudes related to drunk driving and occupant restraints. Volume III is a compendium of question...

  3. Connecticut E.S.E.A. Title III Catalog.

    ERIC Educational Resources Information Center

    Area Cooperative Educational Services, New Haven, CT. Educational Resources Center.

    Title III projects conducted by local education agencies in Connecticut are listed alphabetically by agency and described. Each entry gives project title, amount and term of funding, target population, major objectives, evaluation design, findings to date, and dissemination plan. The agency name and address and the project director for each of the…

  4. Transit at the Table III : A Guide to Effective Participation in Statewide Decisionmaking for Transit Agencies in Non-Urbanized Areas.

    DOT National Transportation Integrated Search

    2011-09-30

    This report draws upon eight State case studies to identify processes, experiences, and results of transit participation in statewide planning with a focus on non-urbanized or rural areas. Transit at the Table III is intended as a resource for organi...

  5. 40 CFR Table 8 to Subpart Jjjjjj... - Applicability of General Provisions to Subpart JJJJJJ

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... malfunctions ASAP No. § 63.6(e)(3) SSM Plan No. § 63.6(f)(1) SSM exemption No. § 63.6(h)(1) SSM exemption No... operation No. § 63.8(c)(1)(iii) Requirement to develop SSM Plan for CMS No. § 63.8(d)(3) Written procedures for CMS Yes, except for the last sentence, which refers to an SSM plan. SSM plans are not required...

  6. 40 CFR Table 8 to Subpart Jjjjjj... - Applicability of General Provisions to Subpart JJJJJJ

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... malfunctions ASAP No. § 63.6(e)(3) SSM Plan No. § 63.6(f)(1) SSM exemption No. § 63.6(h)(1) SSM exemption No... operation No. § 63.8(c)(1)(iii) Requirement to develop SSM Plan for CMS No. § 63.8(d)(3) Written procedures for CMS Yes, except for the last sentence, which refers to an SSM plan. SSM plans are not required...

  7. 40 CFR Table 8 to Subpart Jjjjjj... - Applicability of General Provisions to Subpart JJJJJJ

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... malfunctions ASAP No. § 63.6(e)(3) SSM Plan No. § 63.6(f)(1) SSM exemption No. § 63.6(h)(1) SSM exemption No... operation No. § 63.8(c)(1)(iii) Requirement to develop SSM Plan for CMS No. § 63.8(d)(3) Written procedures for CMS Yes, except for the last sentence, which refers to an SSM plan. SSM plans are not required...

  8. 40 CFR Table 8 to Subpart Jjjjjj... - Applicability of General Provisions to Subpart JJJJJJ

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... malfunctions ASAP No. § 63.6(e)(3) SSM Plan No. § 63.6(f)(1) SSM exemption No. § 63.6(h)(1) SSM exemption No... operation No. § 63.8(c)(1)(iii) Requirement to develop SSM Plan for CMS No. § 63.8(d)(3) Written procedures for CMS Yes, except for the last sentence, which refers to an SSM plan. SSM plans are not required...

  9. 26 CFR 1.401(a)(5)-1 - Special rules relating to nondiscrimination requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... employees. (d) Certain disparity permitted. Under section 401(a)(5)(C), a plan does not discriminate in... compensation within the meaning of section 3231(e). For this purpose, a plan maintained for a self-employed... deemed to be a plan maintained by an employer that pays wages within the meaning of section 3121(a). (iii...

  10. The Institutionalization of Private Sector Strategic Planning Methods in a Public Sector Research & Development Organization: The Naval Surface Warfare Center Case 1982-1989

    DTIC Science & Technology

    1990-02-01

    infancy during Cycle I, at the novice level during Cycle II, and at the advanced beginner level during Cycle III. The next two sections and Chapters 6...5 Table 1 - 1983 NSWC Planning Activities . . . . . . . 14 Table 1A - Planning Activity Flowchart . . . . . . . 14.1 Table 2 - Sector/SBU

  11. 15 CFR 714.3 - Advance declaration requirements for additionally planned production of Schedule 3 chemicals.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... a Schedule 3 chemical above the declaration threshold; (ii) You plan to produce at a plant declared...; (iii) You plan to increase the production of a Schedule 3 chemical by declared plants on your plant... production of a Schedule 3 chemical at a declared plant site to an amount above the upper limit of the range...

  12. 15 CFR 714.3 - Advance declaration requirements for additionally planned production of Schedule 3 chemicals.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... a Schedule 3 chemical above the declaration threshold; (ii) You plan to produce at a plant declared...; (iii) You plan to increase the production of a Schedule 3 chemical by declared plants on your plant... production of a Schedule 3 chemical at a declared plant site to an amount above the upper limit of the range...

  13. 15 CFR 714.3 - Advance declaration requirements for additionally planned production of Schedule 3 chemicals.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... a Schedule 3 chemical above the declaration threshold; (ii) You plan to produce at a plant declared...; (iii) You plan to increase the production of a Schedule 3 chemical by declared plants on your plant... production of a Schedule 3 chemical at a declared plant site to an amount above the upper limit of the range...

  14. Computer-based guidelines for concrete pavements : HIPERPAV III : user manual

    DOT National Transportation Integrated Search

    2009-10-01

    This user manual provides guidance on how to use the new High PERformance PAVing (HIPERPAV) III software program for the analysis of early-age Portland cement concrete pavement (PCCP) behavior. HIPERPAV III includes several improvements over prev...

  15. 20 CFR 632.255 - Program planning.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... that may be characterized as planning and design but not program operation. (c) Expenses incurred in... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Program planning. 632.255 Section 632.255... EMPLOYMENT AND TRAINING PROGRAMS Summer Youth Employment and Training Programs § 632.255 Program planning. (a...

  16. SU-G-TeP4-06: An Integrated Application for Radiation Therapy Treatment Plan Directives, Management, and Reporting

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Matuszak, M; Anderson, C; Lee, C

    Purpose: With electronic medical records, patient information for the treatment planning process has become disseminated across multiple applications with limited quality control and many associated failure modes. We present the development of a single application with a centralized database to manage the planning process. Methods: The system was designed to replace current functionalities of (i) static directives representing the physician intent for the prescription and planning goals, localization information for delivery, and other information, (ii) planning objective reports, (iii) localization and image guidance documents and (iv) the official radiation therapy prescription in the medical record. Using the Eclipse Scripting Applicationmore » Programming Interface, a plug-in script with an associated domain-specific SQL Server database was created to manage the information in (i)–(iv). The system’s user interface and database were designed by a team of physicians, clinical physicists, database experts, and software engineers to ensure usability and robustness for clinical use. Results: The resulting system has been fully integrated within the TPS via a custom script and database. Planning scenario templates, version control, approvals, and logic-based quality control allow this system to fully track and document the planning process as well as physician approval of tradeoffs while improving the consistency of the data. Multiple plans and prescriptions are supported along with non-traditional dose objectives and evaluation such as biologically corrected models, composite dose limits, and management of localization goals. User-specific custom views were developed for the attending physician review, physicist plan checks, treating therapists, and peer review in chart rounds. Conclusion: A method was developed to maintain cohesive information throughout the planning process within one integrated system by using a custom treatment planning management application that interfaces directly with the TPS. Future work includes quantifying the improvements in quality, safety and efficiency that are possible with the routine clinical use of this system. Supported in part by NIH-P01-CA-059827.« less

  17. 34 CFR 74.25 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Revision of budget and program plans. 74.25 Section 74... Requirements Financial and Program Management § 74.25 Revision of budget and program plans. (a) The budget plan...) Recipients are required to report deviations from budget and program plans, and request prior approvals for...

  18. Terms used by nurses to describe patient problems: can SNOMED III represent nursing concepts in the patient record?

    PubMed Central

    Henry, S B; Holzemer, W L; Reilly, C A; Campbell, K E

    1994-01-01

    OBJECTIVE: To analyze the terms used by nurses in a variety of data sources and to test the feasibility of using SNOMED III to represent nursing terms. DESIGN: Prospective research design with manual matching of terms to the SNOMED III vocabulary. MEASUREMENTS: The terms used by nurses to describe patient problems during 485 episodes of care for 201 patients hospitalized for Pneumocystis carinii pneumonia were identified. Problems from four data sources (nurse interview, intershift report, nursing care plan, and nurse progress note/flowsheet) were classified based on the substantive area of the problem and on the terminology used to describe the problem. A test subset of the 25 most frequently used terms from the two written data sources (nursing care plan and nurse progress note/flowsheet) were manually matched to SNOMED III terms to test the feasibility of using that existing vocabulary to represent nursing terms. RESULTS: Nurses most frequently described patient problems as signs/symptoms in the verbal nurse interview and intershift report. In the written data sources, problems were recorded as North American Nursing Diagnosis Association (NANDA) terms and signs/symptoms with similar frequencies. Of the nursing terms in the test subset, 69% were represented using one or more SNOMED III terms. PMID:7719788

  19. 7 CFR 650.12 - NRCS decisionmaking.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    .... NRCS provides technical and financial assistance for projects under the Watershed Protection and Flood... are as follows: (1) For Watershed Protection and Flood Prevention projects: (i) Application for... comment is solicited. A decision is made to stop planning assistance or to develop a watershed plan. (iii...

  20. 7 CFR 650.12 - NRCS decisionmaking.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    .... NRCS provides technical and financial assistance for projects under the Watershed Protection and Flood... are as follows: (1) For Watershed Protection and Flood Prevention projects: (i) Application for... comment is solicited. A decision is made to stop planning assistance or to develop a watershed plan. (iii...

  1. 7 CFR 650.12 - NRCS decisionmaking.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... NRCS provides technical and financial assistance for projects under the Watershed Protection and Flood... are as follows: (1) For Watershed Protection and Flood Prevention projects: (i) Application for... comment is solicited. A decision is made to stop planning assistance or to develop a watershed plan. (iii...

  2. 7 CFR 650.12 - NRCS decisionmaking.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    .... NRCS provides technical and financial assistance for projects under the Watershed Protection and Flood... are as follows: (1) For Watershed Protection and Flood Prevention projects: (i) Application for... comment is solicited. A decision is made to stop planning assistance or to develop a watershed plan. (iii...

  3. The challenge to NOx emission control for heavy-duty diesel vehicles in China

    NASA Astrophysics Data System (ADS)

    Wu, Y.; Zhang, S. J.; Li, M. L.; Ge, Y. S.; Shu, J. W.; Zhou, Y.; Xu, Y. Y.; Hu, J. N.; Liu, H.; Fu, L. X.; He, K. B.; Hao, J. M.

    2012-07-01

    China's new "Twelfth Five-Year Plan" set a target for total NOx emission reduction of 10% for the period of 2011-2015. Heavy-duty diesel vehicles (HDDVs) have been considered a major contributor to NOx emissions in China. Beijing initiated a comprehensive vehicle test program in 2008. This program included a sub-task for measuring on-road emission profiles of hundreds of HDDVs using portable emission measurement systems (PEMS). The major finding is that neither the on-road distance-specific (g km -1) nor brake-specific (g kW h-1) NOx emission factors for diesel buses and heavy-duty diesel trucks improved in most cases as emission standards became more stringent. For example, the average NOx emission factors for Euro II, Euro III and Euro IV buses are 11.3±3.3 g km-1, 12.5± 1.3 g km-1, and 11.8±2.0 g km-1, respectively. No statistically significant difference in NOx emission factors was observed between Euro II and III buses. Even for Euro IV buses equipped with SCR systems, the NOx emission factors are similar to Euro III buses. The data regarding real-time engine performance of Euro IV buses suggest the engine certification cycles did not reflect their real-world operating conditions. These new on-road test results indicate that previous estimates of total NOx emissions for HDDV fleet may be significantly underestimated. The new estimate in total NOx emissions for the Beijing HDDV fleet in 2009 is 37.0 Gg, an increase of 45% compared to the previous study. Further, we estimate that the total NOx emissions for the national HDDV fleet in 2009 are approximately 4.0 Tg, higher by 1.0 Tg (equivalent to 18% of total NOx emissions for vehicle fleet in 2009) than that estimated in the official report. This would also result in 4% increase in estimation of national anthropogenic NOx emissions. More effective control measures (such as promotion of CNG buses and a new in-use compliance testing program) are urged to secure the goal of total NOxmitigation for the HDDV fleet in the future.

  4. The challenge to NOx emission control for heavy-duty diesel vehicles in China

    NASA Astrophysics Data System (ADS)

    Wu, Y.; Zhang, S. J.; Li, M. L.; Ge, Y. S.; Shu, J. W.; Zhou, Y.; Xu, Y. Y.; Hu, J. N.; Liu, H.; Fu, L. X.; He, K. B.; Hao, J. M.

    2012-10-01

    China's new "Twelfth Five-Year Plan" set a target for total NOx emission reduction of 10% for the period of 2011-2015. Heavy-duty diesel vehicles (HDDVs) have been considered a major contributor to NOx emissions in China. Beijing initiated a comprehensive vehicle test program in 2008. This program included a sub-task for measuring on-road emission profiles of hundreds of HDDVs using portable emission measurement systems (PEMS). The major finding is that neither the on-road distance-specific (g km-1) nor brake-specific (g kWh-1) NOx emission factors for diesel buses and heavy-duty diesel trucks improved in most cases as emission standards became more stringent. For example, the average NOx emission factors for Euro II, Euro III and Euro IV buses are 11.3 ± 3.3 g km-1, 12.5 ± 1.3 g km-1, and 11.8 ± 2.0 g km-1, respectively. No statistically significant difference in NOx emission factors was observed between Euro II and III buses. Even for Euro IV buses equipped with SCR systems, the NOx emission factors are similar to Euro III buses. The data regarding real-time engine performance of Euro IV buses suggest the engine certification cycles did not reflect their real-world operating conditions. These new on-road test results indicate that previous estimates of total NOx emissions for HDDV fleet may be significantly underestimated. The new estimate in total NOx emissions for the Beijing HDDV fleet in 2009 is 37.0 Gg, an increase of 45% compared to the previous study. Further, we estimate that the total NOx emissions for the national HDDV fleet in 2009 are approximately 4.0 Tg, higher by 1.0 Tg (equivalent to 18% of total NOx emissions for vehicle fleet in 2009) than that estimated in the official report. This would also result in 4% increase in estimation of national anthropogenic NOx emissions. More effective control measures (such as promotion of CNG buses and a new in-use compliance testing program) are urged to secure the goal of total NOx mitigation for the HDDV fleet in the future.

  5. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-10-01

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation's scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory's ongoing research programs. The plan is an institutional management report for integration with the Department of Energy's strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy's program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory's scientific and support divisions.« less

  6. An examination of the stretching practices of Division I and Division III college football programs in the midwestern United States.

    PubMed

    Judge, Lawrence W; Craig, Bruce; Baudendistal, Steve; Bodey, Kimberly J

    2009-07-01

    Research supports the use of preactivity warm-up and stretching, and the purpose of this study was to determine whether college football programs follow these guidelines. Questionnaires designed to gather demographic, professional, and educational information, as well as specific pre- and postactivity practices, were distributed via e-mail to midwestern collegiate programs from NCAA Division I and III conferences. Twenty-three male coaches (12 from Division IA schools and 11 from Division III schools) participated in the study. Division I schools employed certified strength coaches (CSCS; 100%), whereas Division III schools used mainly strength coordinators (73%), with only 25% CSCS. All programs used preactivity warm-up, with the majority employing 2-5 minutes of sport-specific jogging/running drills. Pre stretching (5-10 minutes) was performed in 19 programs (91%), with 2 (9%) performing no pre stretching. Thirteen respondents used a combination of static/proprioceptive neuromuscular facilitation/ballistic and dynamic flexibility, 5 used only dynamic flexibility, and 1 used only static stretching. All 12 Division I coaches used stretching, whereas only 9 of the 11 Division III coaches did (p = 0.22). The results indicate that younger coaches did not use pre stretching (p = 0.30). The majority of the coaches indicated that they did use post stretching, with 11 of the 12 Division I coaches using stretching, whereas only 5 of the 11 Division III coaches used stretching postactivity (p = 0.027). Divisional results show that the majority of Division I coaches use static-style stretching (p = 0.049). The results of this study indicate that divisional status, age, and certification may influence how well research guidelines are followed. Further research is needed to delineate how these factors affect coaching decisions.

  7. FUSE Cycle 3 Program CO22: Chromospheric Activity in Population II Giants

    NASA Technical Reports Server (NTRS)

    Harper, Graham M.

    2004-01-01

    One of the mysteries of Population II giants is that they still show chromospheric emission despite their great age. The global dynamo which was active during their main-sequence lifetimes is expected to become extremely weak through magnetic rotational braking. The nature of the observed emission is not understood; although acoustic shock waves might provide the heating, acoustic waves are not predicted to drive the observed mass loss - which in turn requires the dissipation of magneto-hydrodynamic waves. This program was designed to search for the faint stellar H Ly(beta) emission wings and the fluorescent Fe II and H2 emission from one of the brightest, metal poor, Population II stars. These FUSE diagnostics, when combined with existing UV and optical spectra, help determine the major radiative cooling channels for the chromosphere. This observation was to complement that previously planned for the mildly metal deficient giant alpha Boo (K2 III). However, a Boo has yet to be observed with FUSE.

  8. Site Safety and Health Plan (Phase 3) for the treatability study for in situ vitrification at Seepage Pit 1 in Waste Area Grouping 7, Oak Ridge National Laboratory, Oak Ridge, TN

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Spalding, B.P.; Naney, M.T.

    1995-06-01

    This plan is to be implemented for Phase III ISV operations and post operations sampling. Two previous project phases involving site characterization have been completed and required their own site specific health and safety plans. Project activities will take place at Seepage Pit 1 in Waste Area Grouping 7 at ORNL, Oak Ridge, Tennessee. Purpose of this document is to establish standard health and safety procedures for ORNL project personnel and contractor employees in performance of this work. Site activities shall be performed in accordance with Energy Systems safety and health policies and procedures, DOE orders, Occupational Safety and Healthmore » Administration Standards 29 CFR Part 1910 and 1926; applicable United States Environmental Protection Agency requirements; and consensus standards. Where the word ``shall`` is used, the provisions of this plan are mandatory. Specific requirements of regulations and orders have been incorporated into this plan in accordance with applicability. Included from 29 CFR are 1910.120 Hazardous Waste Operations and Emergency Response; 1910.146, Permit Required - Confined Space; 1910.1200, Hazard Communication; DOE Orders requirements of 5480.4, Environmental Protection, Safety and Health Protection Standards; 5480.11, Radiation Protection; and N5480.6, Radiological Control Manual. In addition, guidance and policy will be followed as described in the Environmental Restoration Program Health and Safety Plan. The levels of personal protection and the procedures specified in this plan are based on the best information available from reference documents and site characterization data. Therefore, these recommendations represent the minimum health and safety requirements to be observed by all personnel engaged in this project.« less

  9. Program planning for the community teaching hospital medical library.

    PubMed Central

    McCorkel, J; Cook, V

    1985-01-01

    To respond to the increasing demand for information from medical educators and clinicians and to persuade administrators to purchase the newly available microcomputer library systems, medical librarians in community teaching hospitals may find it useful to engage in intermediate term (for example, five-year) program planning. To increase the probability that the plan which emerges will be implemented, the planning process should fit the organizational nexus. Planning involves needs assessment, prioritized program elements, a written plan, and facilities planning (if applicable), which lead to program implementation. Components of a model program plan are presented. PMID:4027443

  10. 45 CFR 1321.1 - Basis and purpose of this part.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON AGING, OLDER AMERICANS PROGRAMS GRANTS TO STATE AND COMMUNITY PROGRAMS ON AGING Introduction § 1321.1 Basis and purpose of this part. (a... on title III of the Act. Title III provides for formula grants to State agencies on aging, under...

  11. 45 CFR 1321.1 - Basis and purpose of this part.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON AGING, OLDER AMERICANS PROGRAMS GRANTS TO STATE AND COMMUNITY PROGRAMS ON AGING Introduction § 1321.1 Basis and purpose of this part. (a... on title III of the Act. Title III provides for formula grants to State agencies on aging, under...

  12. 45 CFR 1321.1 - Basis and purpose of this part.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION ON AGING, OLDER AMERICANS PROGRAMS GRANTS TO STATE AND COMMUNITY PROGRAMS ON AGING Introduction § 1321.1 Basis and purpose of this part. (a... on title III of the Act. Title III provides for formula grants to State agencies on aging, under...

  13. ASBESTOS CONTAINING MATERIALS IN SCHOOL BUILDINGS: BULK SAMPLE ANALYSIS QUALITY ASSURANCE PROGRAM. BULK SAMPLE ROUNDS 12, 13 AND BLIND ROUND III

    EPA Science Inventory

    The report presents the results of laboratories participating in the twelveth, thirteenth and third (III) blind round of the bulk sample analysis quality assurance program sponsored by the U.S. Environmental Protection Agency. Three hundred twenty-three, 386 and 51 laboratories w...

  14. 40 CFR 147.753 - Existing Class I and III wells authorized by rule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS Indiana § 147.753 Existing Class I and III wells authorized by rule. Maximum injection pressure. The owner or operator shall limit injection pressure to the lessor of: (a) A value which will not...

  15. 40 CFR 146.10 - Plugging and abandoning Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... (CONTINUED) WATER PROGRAMS (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM: CRITERIA AND STANDARDS General... of drinking water. The Director may allow Class III wells to use other plugging materials if the... sources of drinking water. (2) Placement of the cement plugs shall be accomplished by one of the following...

  16. Doorways III: Teacher Reference Materials. On School-Related Gender-Based Violence Prevention and Response

    ERIC Educational Resources Information Center

    US Agency for International Development, 2009

    2009-01-01

    The Doorways training program was designed by the U.S. Agency for International Development (USAID)-funded Safe Schools Program (Safe Schools) to enable teachers, community members and students to prevent and respond to school-related gender-based violence (SRGBV). This booklet, "Doorways III: Teacher Reference Materials on School-Related…

  17. Highway concrete pavement technology development and testing. Volume 5, Field evaluation of Strategic Highway Research Program (SHRP) C-206 test sites (bridge deck overlays)

    DOT National Transportation Integrated Search

    2006-08-01

    Two types of concrete overlays silica fume concrete (SFC) and latex-modified Type III portland cement concrete (LMC-III) were installed ant tested as part of the Strategic Highway Research Program (SHRP) Project C-206: Optimization of Highway Concret...

  18. The Stratospheric Aerosol and Gas Experiment III/International Space Station Mission: Science Objectives and Mission Status

    NASA Astrophysics Data System (ADS)

    Eckman, R.; Zawodny, J. M.; Cisewski, M. S.; Flittner, D. E.; McCormick, M. P.; Gasbarre, J. F.; Damadeo, R. P.; Hill, C. A.

    2015-12-01

    The Stratospheric Aerosol and Gas Experiment III/International Space Station (SAGE III/ISS) is a strategic climate continuity mission which was included in NASA's 2010 plan, "Responding to the Challenge of Climate and Environmental Change: NASA's Plan for a Climate-Centric Architecture for Earth Observations and Applications from Space." SAGE III/ISS continues the long-term, global measurements of trace gases and aerosols begun in 1979 by SAGE I and continued by SAGE II and SAGE III on Meteor 3M. Using a well characterized occultation technique, the SAGE III instrument's spectrometer will measure vertical profiles of ozone, aerosols, water vapor, nitrogen dioxide, and other trace gases relevant to ozone chemistry. The mission will launch in 2016 aboard a Falcon 9 spacecraft.The primary objective of SAGE III/ISS is to monitor the vertical distribution of aerosols, ozone, and other trace gases in the Earth's stratosphere and troposphere to enhance our understanding of ozone recovery and climate change processes in the stratosphere and upper troposphere. SAGE III/ISS will provide data necessary to assess the state of the recovery in the distribution of ozone, extend the SAGE III aerosol measurement record that is needed by both climate models and ozone models, and gain further insight into key processes contributing to ozone and aerosol variability. The multi-decadal SAGE ozone and aerosol data sets have undergone intense community scrutiny for accuracy and stability. SAGE ozone data have been used to monitor the effectiveness of the Montreal Protocol.The ISS inclined orbit of 51.6 degrees is ideal for SAGE III measurements because the orbit permits solar occultation measurement coverage to approximately +/- 70 degrees of latitude. SAGE III/ISS will make measurements using the solar occultation measurement technique, lunar occultation measurement technique, and the limb scattering measurement technique. In this presentation, we describe the SAGE III/ISS mission, its implementation, the current status of the instrument, and the testing that took place this past summer. We will focus principally on the science to be conducted by the mission.

  19. Development, design, and conceptual issues of project zero exposure: A program to protect young children from tobacco smoke exposure

    PubMed Central

    2011-01-01

    Background Tobacco smoke exposure (TSE) is a serious threat to child health. Roughly 40% of children worldwide are exposed to tobacco smoke, and the very young are often "captive smokers" in homes in which others smoke. The goal of this research project is to develop and evaluate an intervention to reduce young child tobacco smoke exposure. The objective of this paper is to document our approach to building the intervention, to describe the planned intervention, and to explore the conceptual issues regarding the intervention and its evaluation. Methods/Design This project is being developed using an iterative approach. We are currently in the middle of Stage 1. In this first stage, Intervention Development, we have already conducted a comprehensive search of the professional literature and internet resources, consulted with experts in the field, and conducted several Design Workshops. The planned intervention consists of parental group support therapy, a website to allow use of an "online/offline" approach, involvement of pediatricians, use of a video simulation game ("Dr. Cruz") to teach parents about child TSE, and personalized biochemical feedback on exposure levels. As part of this stage we will draw on a social marketing approach. We plan to use in-depth interviews and focus groups in order to identify barriers for behavior change, and to test the acceptability of program components. In Stage II, we plan to pilot the planned intervention with 5-10 groups of 10 parents each. In Stage III, we plan to implement and evaluate the intervention using a cluster randomized controlled trial with an estimated 540 participants. Discussion The major challenges in this research are twofold: building an effective intervention and measuring the effects of the intervention. Creation of an effective intervention to protect children from TSE is a challenging but sorely needed public health endeavor. We hope that our approach will contribute to building a stronger evidence base for control of child exposure to tobacco smoke. Trial registration ClinicalTrials.gov Identifier: NCT01335178 PMID:21711530

  20. Effect of strategic planning education on attitudes and perceptions of independent community pharmacy owners/managers.

    PubMed

    Harrison, Donald L

    2007-01-01

    To assess the impact of formal education program participation on the attitudes and perceptions of independent community pharmacy owners/managers toward strategic planning. Cross-sectional study. United States; June 4-July 30, 2004. Nationwide random sample of 1,250 owners/managers of independent community pharmacies. Mailed survey. Strategic planning formal education program participation. Comprehensiveness of strategic planning. Attitudes and perceptions of owners/managers of independent community pharmacies toward strategic planning. A total of 527 (42.1%) usable questionnaires were returned. Only 124 (23.5%) respondents indicated that they participated in a formal strategic planning education program. However, of the 141 (26.85%) respondents who indicated that they had conducted strategic planning for their community pharmacy, 111 (89.5%) had participated in a formal strategic planning education program. A significant association was detected between formal education program participation and the conducting of strategic planning (P< or =0.0001). Significant differences were observed for all attitudes and perceptions of independent community pharmacy owners/managers toward strategic planning based on program participation (P< or =0.0001). Finally, respondents who indicated that they had participated in a formal education program had a significantly higher comprehensiveness of strategic planning rating than those respondents who did not participate in an educational program (P< or =0.0001). A significant association exists between formal strategic planning education program participation and the conducting of strategic planning by owner/managers of independent community pharmacies, and those participating in such programs have significantly different attitudes and perceptions toward the conducting of strategic planning and have a significantly higher comprehensiveness of strategic planning rating.

  1. General Improvement of Reading Instruction, Grades 1-12, Teacher Training Program of Title III, P.L. 89-10. Evaluation of Second Phase of Program, Summer 1968.

    ERIC Educational Resources Information Center

    Brookland-Cayce Schools, West Columbia, SC.

    An evaluation of the second phase of a projected 3-year Title III inservice reading instruction program for teaching personnel is presented after one and one-half years of operation in 16 Cayce-West Columbia, South Carolina, schools. Included is an evaluation prepared by each of the 11 elementary supervisors which includes objectives and how they…

  2. Selecting Policy Indicators and Developing Simulation Models for the National School Lunch and Breakfast Programs. Final Report. Special Nutrition Programs Report Series. Special Nutrition Programs Report No. CN-10-PRED

    ERIC Educational Resources Information Center

    Dragoset, Lisa; Gordon, Anne

    2010-01-01

    This report describes work using nationally representative 2005 data from the School Nutrition Dietary Assessment-III (SNDA-III) study to develop a simulation model to predict the potential implications of changes in policies or practices related to school meals and school food environments. The model focuses on three domains of outcomes: (1) the…

  3. PACE and the Federal Housing Finance Agency (FHFA)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zimring, Mark; Fuller, Merrian

    The FHFA regulates Fannie Mae, Freddie Mac, and the 12 Federal Home Loan Banks (the government-sponsored enterprises - GSEs). On June 18, 2009, James B. Lockhart III, then Director of FHFA, released a letter expressing concern about the negative impact of energy loan tax assessment programs (ELTAPs) - also known as Property Assessed Clean Energy (PACE) programs - on both the housing finance system and homeowner program participants. Subsequently, a number of PACE proponents responded to the concerns laid out in the FHFA letter. In early Fall 2009, word circulated that FHFA was planning to follow its June letter withmore » guidance to other agencies, possibly including Fannie Mae and Freddie Mac, discouraging them from buying loans on properties subject to PACE-type assessment liens. This triggered a second round of stakeholder letters, several of which were addressed to President Obama. On October 18, 2009, the White House, in what some believe was an attempt to obviate the need for FHFA guidance, released a Policy Framework for PACE Financing Programs that outlined best practices guidance for homeowner and lender protection. As of February 2010, FHFA and the GSEs have agreed to monitor PACE programs and work with stakeholders and the Administration to consider additional guidance beyond the Policy Framework and to collect more information on PACE program efficacy and risks. A summary of the communications timeline and highlights of the communications are provided.« less

  4. 77 FR 45307 - Approval and Promulgation of Air Quality Implementation Plans: Georgia; Control Techniques...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-31

    ... October 7, 2008 (73 FR 58481), EPA updated the 1977 CTG, as part of Group IV CTG, addressing the control... Group III CTG, addressing control of VOC emissions from metal furniture coating operations. On January 3..., as part of Group III CTG, addressing the control of VOC emissions from large appliance surface...

  5. 76 FR 26679 - Approval and Promulgation of Air Quality Implementation Plans; Delaware; Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-09

    ...-mail: cox[email protected] . C. Mail: EPA-R03-OAR-2010-0770, Kathleen Cox, Associate Director, Office of Permits and Air Toxics, Mailcode 3AP10, U.S. Environmental Protection Agency, Region III, 1650... III address. Such deliveries are only accepted during the Docket's normal hours of operation, and...

  6. Masonry Specialist III & IV, 3-20. Military Curriculum Materials for Vocational and Technical Education.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. National Center for Research in Vocational Education.

    These military-developed curriculum materials consist of a course description, plan of instruction, study guides, and workbooks for use in training masonry specialists. Covered in the course blocks are laying concrete blocks, stone, and bricks as well as plaster, stucco, and tile. Course block III, on laying concrete blocks, stone, and bricks,…

  7. 40 CFR 52.720 - Identification of plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 2, Parts I, II and III were submitted May 4, 1972, by the Governor. (3) A document describing the... and the final rulemaking action: (i)-(iii) [Reserved] (iv) The new materials in Section 4.11 of the... boilers a variance from the requirements of IPCB (A), Rule 203(g)(1)(C)(i) and/or Rule 203(g)(1)(D) which...

  8. 146. ARAIII Control building (ARA607) Roof plan and details. Aerojetgeneral ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    146. ARA-III Control building (ARA-607) Roof plan and details. Aerojet-general 880-area/GCRE-607-A-3. Date: February 1958. Ineel index code no. 063-0607-00-013-102548. - Idaho National Engineering Laboratory, Army Reactors Experimental Area, Scoville, Butte County, ID

  9. 7 CFR 272.2 - Plan of operation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... obesity prevention services as discussed in paragraph (d)(2) of this section. (iv) A plan for the State... in local communities; (iii) Describe the nutrition education and obesity prevention services that the... use the SNAP-Ed nutrition education and obesity prevention grant to fund the administrative costs of...

  10. PREPARATION AIDS FOR THE DEVELOPMENT OF CATEGORY III QUALITY ASSURANCE PROJECT PLANS

    EPA Science Inventory

    Data collection activities performed for the Risk Reduction Engineering Laboratory (RREL) of the U.S. Environmental Protection Agency are divided into four categories, depending on the intended use of the data. uality Assurance (QA) Project Plans are written to ensure that projec...

  11. 77 FR 45370 - Renewal of Agency Information Collection for Class III Gaming; Tribal Revenue Allocation Plans...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-31

    ... Procedures authorized by OMB Control Number 1076-0149, Tribal Revenue Allocation Plans authorized by OMB Control Number 1076-0152, and Gaming on Trust Lands Acquired After October 17, 1988 authorized by OMB Control Number 1076- 0158. These [[Page 45371

  12. 26 CFR 1.453A-2 - Treatment of revolving credit plans; taxable years beginning on or before December 31, 1986.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., and other similar plans or arrangements for the sale of personal property under which the customer agrees to pay each billing-month (as defined in paragraph (c)(6)(iii) of this section) a part of the outstanding balance of the customer's account. Sales under a revolving credit plan do not constitute sales on...

  13. Radiation treatment planning techniques for lymphoma of the stomach

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Della Biancia, Cesar; Hunt, Margie; Furhang, Eli

    2005-07-01

    Purpose: Involved-field radiation therapy of the stomach is often used in the curative treatment of gastric lymphoma. Yet, the optimal technique to irradiate the stomach with minimal morbidity has not been well established. This study was designed to evaluate treatment planning alternatives for stomach irradiation, including intensity-modulated radiation therapy (IMRT), to determine which approach resulted in improved dose distribution and to identify patient-specific anatomic factors that might influence a treatment planning choice. Methods and Materials: Fifteen patients with lymphoma of the stomach (14 mucosa-associated lymphoid tissue lymphomas and 1 diffuse large B-cell lymphoma) were categorized into 3 types, depending onmore » the geometric relationship between the planning target volume (PTV) and kidneys. AP/PA and 3D conformal radiation therapy (3DCRT) plans were generated for each patient. IMRT was planned for 4 patients with challenging geometric relationship between the PTV and the kidneys to determine whether it was advantageous to use IMRT. Results: For type I patients (no overlap between PTV and kidneys), there was essentially no benefit from using 3DCRT over AP/PA. However, for patients with PTVs in close proximity to the kidneys (type II) or with high degree of overlap (type III), the 4-field 3DCRT plans were superior, reducing the kidney V {sub 15Gy} by approximately 90% for type II and 50% for type III patients. For type III, the use of a 3DCRT plan rather than an AP/PA plan decreased the V {sub 15Gy} by approximately 65% for the right kidney and 45% for the left kidney. In the selected cases, IMRT led to a further decrease in left kidney dose as well as in mean liver dose. Conclusions: The geometric relationship between the target and kidneys has a significant impact on the selection of the optimum beam arrangement. Using 4-field 3DCRT markedly decreases the kidney dose. The addition of IMRT led to further incremental improvements in the left kidney and liver dose in selected patients.« less

  14. Lawrence Berkeley Laboratory Institutional Plan, FY 1993--1998

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chew, Joseph T.; Stroh, Suzanne C.; Maio, Linda R.

    1992-10-01

    The FY 1993--1998 Institutional Plan provides an overview of the Lawrence Berkeley Laboratory mission, strategic plan, scientific initiatives, research programs, environment and safety program plans, educational and technology transfer efforts, human resources, and facilities needs. The Strategic Plan section identifies long-range conditions that can influence the Laboratory, potential research trends, and several management implications. The Initiatives section identifies potential new research programs that represent major long-term opportunities for the Laboratory and the resources required for their implementation. The Scientific and Technical Programs section summarizes current programs and potential changes in research program activity. The Environment, Safety, and Health section describesmore » the management systems and programs underway at the Laboratory to protect the environment, the public, and the employees. The Technology Transfer and Education programs section describes current and planned programs to enhance the nation`s scientific literacy and human infrastructure and to improve economic competitiveness. The Human Resources section identifies LBL staff composition and development programs. The section on Site and Facilities discusses resources required to sustain and improve the physical plant and its equipment. The Resource Projections are estimates of required budgetary authority for the Laboratory`s ongoing research programs. The plan is an institutional management report for integration with the Department of Energy`s strategic planning activities that is developed through an annual planning process. The plan identifies technical and administrative directions in the context of the National Energy Strategy and the Department of Energy`s program planning initiatives. Preparation of the plan is coordinated by the Office for Planning and Development from information contributed by the Laboratory`s scientific and support divisions.« less

  15. Implementing corporate wellness programs: a business approach to program planning.

    PubMed

    Helmer, D C; Dunn, L M; Eaton, K; Macedonio, C; Lubritz, L

    1995-11-01

    1. Support of key decision makers is critical to the successful implementation of a corporate wellness program. Therefore, the program implementation plan must be communicated in a format and language readily understood by business people. 2. A business approach to corporate wellness program planning provides a standardized way to communicate the implementation plan. 3. A business approach incorporates the program planning components in a format that ranges from general to specific. This approach allows for flexibility and responsiveness to changes in program planning. 4. Components of the business approach are the executive summary, purpose, background, ground rules, approach, requirements, scope of work, schedule, and financials.

  16. 14 CFR 1260.125 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Revision of budget and program plans. 1260....125 Revision of budget and program plans. (a) The budget plan is the financial expression of the... required to report deviations from budget and program plans, and request prior approvals for budget and...

  17. Self-reliance in health among village women.

    PubMed

    Wong, M L; Chen, P C

    1991-01-01

    A project in a remote region in Sarawak, Malaysia, in which village women were mobilized to plan and implement a kindergarten and child feeding program, illustrates the potential of carefully conceptualized community participation. Permission was obtained from village elders to train 18 mothers (all of whom has at least 4 years of education) to conduct a community needs survey. III health among children emerged as the problem of greatest concern to villagers and a health committee was formed to plan an intervention. Although a team of outside professionals was available for technical support, the emphasis from he onset was on developing self-reliance and community involvement in all decisions. To build confidence and develop leadership, a month-long participatory training course in promotive health care was organized by village health volunteers. Preparation for the project included conversion of an unused hut into a kindergarten and construction of furniture by village men, registration of preschool children, preparation of educational materials, and organization of a kitchen and duty roster for the feeding program. Project funding came from local bake sales and kindergarten subscriptions. Monitoring during the initial phase identified several problems, such as food shortages brought about by drought, some parents' inability to pay for kindergarten services, and a lack of trust in the teacher's abilities. These problems were corrected by the field team, but subsequent supervisory visits focused on teaching problem-solving skills to the local women. An evaluation conducted 1 year after program implementation revealed dramatic increases in the proportion of households producing fruits and vegetables, a higher percentage of breastfeeding mothers, and improvements in weight-for-age among kindergartners.

  18. 49 CFR 613.200 - Statewide transportation planning and programming.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  19. 49 CFR 613.200 - Statewide transportation planning and programming.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  20. 49 CFR 613.200 - Statewide transportation planning and programming.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  1. 49 CFR 613.200 - Statewide transportation planning and programming.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  2. 49 CFR 613.200 - Statewide transportation planning and programming.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Statewide transportation planning and programming. 613.200 Section 613.200 Transportation Other Regulations Relating to Transportation (Continued... Transportation Planning and Programming § 613.200 Statewide transportation planning and programming. The...

  3. 24 CFR 84.25 - Revision of budget and program plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Revision of budget and program... and Program Management § 84.25 Revision of budget and program plans. (a) The budget plan is the... required to report deviations from budget and program plans, and request prior approvals for budget and...

  4. Evaluation Reports of ESEA, Title III Projects: Final Report, FY 1972.

    ERIC Educational Resources Information Center

    District of Columbia Public Schools, Washington, DC. Dept. of Research and Evaluation.

    Through Title III of the Elementary Secondary Education Act of 1965, six programs were funded in Washington, D.C. public schools to meet the educational needs of handicapped disadvantaged children. One of the programs, the Columbia Road Pre-School Pilot Project was designed to serve as an experimental model for early childhood education for…

  5. 40 CFR 147.2800 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 23 2011-07-01 2011-07-01 false State-administered program-Class I, II, III, IV, and V wells. 147.2800 Section 147.2800 Protection of Environment ENVIRONMENTAL PROTECTION... Federal Register effective July 31, 1985. (1) CNMI Environmental Protection Act, 2 CMC sections 3101, et...

  6. 40 CFR 147.2800 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 23 2014-07-01 2014-07-01 false State-administered program-Class I, II, III, IV, and V wells. 147.2800 Section 147.2800 Protection of Environment ENVIRONMENTAL PROTECTION... Federal Register effective July 31, 1985. (1) CNMI Environmental Protection Act, 2 CMC sections 3101, et...

  7. 40 CFR 147.2800 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false State-administered program-Class I, II, III, IV, and V wells. 147.2800 Section 147.2800 Protection of Environment ENVIRONMENTAL PROTECTION... Federal Register effective July 31, 1985. (1) CNMI Environmental Protection Act, 2 CMC sections 3101, et...

  8. 40 CFR 147.2800 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 24 2012-07-01 2012-07-01 false State-administered program-Class I, II, III, IV, and V wells. 147.2800 Section 147.2800 Protection of Environment ENVIRONMENTAL PROTECTION... Federal Register effective July 31, 1985. (1) CNMI Environmental Protection Act, 2 CMC sections 3101, et...

  9. 40 CFR 147.2800 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 24 2013-07-01 2013-07-01 false State-administered program-Class I, II, III, IV, and V wells. 147.2800 Section 147.2800 Protection of Environment ENVIRONMENTAL PROTECTION... Federal Register effective July 31, 1985. (1) CNMI Environmental Protection Act, 2 CMC sections 3101, et...

  10. 40 CFR 147.2550 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Rules and Regulations, Wyoming Department of Environmental Quality, Chapter XXI: In Situ Mining... program for Class I, III, IV and V wells in the State of Wyoming, except those on Indian lands is the... section 1422 of the SDWA. Notice of this approval was published in the Federal Register on July 15, 1983...

  11. 40 CFR 147.2550 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Rules and Regulations, Wyoming Department of Environmental Quality, Chapter XXI: In Situ Mining... program for Class I, III, IV and V wells in the State of Wyoming, except those on Indian lands is the... section 1422 of the SDWA. Notice of this approval was published in the Federal Register on July 15, 1983...

  12. Search and retrieval of office files using dBASE 3

    NASA Technical Reports Server (NTRS)

    Breazeale, W. L.; Talley, C. R.

    1986-01-01

    Described is a method of automating the office files retrieval process using a commercially available software package (dBASE III). The resulting product is a menu-driven computer program which requires no computer skills to operate. One part of the document is written for the potential user who has minimal computer experience and uses sample menu screens to explain the program; while a second part is oriented towards the computer literate individual and includes rather detailed descriptions of the methodology and search routines. Although much of the programming techniques are explained, this document is not intended to be a tutorial on dBASE III. It is hoped that the document will serve as a stimulus for other applications of dBASE III.

  13. Evaluation Planning, Evaluation Management, and Utilization of Evaluation Results within Adult Literacy Campaigns, Programs and Projects (with Implications for Adult Basic Education and Nonformal Education Programs in General). A Working Paper.

    ERIC Educational Resources Information Center

    Bhola, H. S.

    Addressed to professionals involved in program evaluation, this working paper covers various aspects of evaluation planning, including the following: planning as a sociotechnical process, steps in evaluation planning, program planning and implementation versus evaluation planning and implementation, the literacy system and its subsystems, and some…

  14. 42 CFR 431.978 - Eligibility sampling plan and procedures.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., for example, by making adjustments to the plan when necessary due to fluctuations in the universe. (2... active and negative universes; or (ii) If the active case universe or negative case universe of Medicaid... active cases and negative cases, respectively. (iii) If the active case universe or negative case...

  15. 42 CFR 431.978 - Eligibility sampling plan and procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., for example, by making adjustments to the plan when necessary due to fluctuations in the universe. (2... active and negative universes; or (ii) If the active case universe or negative case universe of Medicaid... active cases and negative cases, respectively. (iii) If the active case universe or negative case...

  16. 42 CFR 431.978 - Eligibility sampling plan and procedures.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., for example, by making adjustments to the plan when necessary due to fluctuations in the universe. (2... active and negative universes; or (ii) If the active case universe or negative case universe of Medicaid... active cases and negative cases, respectively. (iii) If the active case universe or negative case...

  17. 42 CFR 431.978 - Eligibility sampling plan and procedures.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., for example, by making adjustments to the plan when necessary due to fluctuations in the universe. (2... active and negative universes; or (ii) If the active case universe or negative case universe of Medicaid... active cases and negative cases, respectively. (iii) If the active case universe or negative case...

  18. 42 CFR 431.978 - Eligibility sampling plan and procedures.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., for example, by making adjustments to the plan when necessary due to fluctuations in the universe. (2... active and negative universes; or (ii) If the active case universe or negative case universe of Medicaid... active cases and negative cases, respectively. (iii) If the active case universe or negative case...

  19. 33 CFR 155.1045 - Response plan requirements for vessels carrying oil as a secondary cargo.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... must include the following functional areas and must further include information for key components within each functional area: (i) Command and control; (ii) Public information; (iii) Safety; (iv) Liaison with government agencies; (v) Spill response operations; (vi) Planning; (vii) Logistics support; and...

  20. 33 CFR 155.1045 - Response plan requirements for vessels carrying oil as a secondary cargo.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... must include the following functional areas and must further include information for key components within each functional area: (i) Command and control; (ii) Public information; (iii) Safety; (iv) Liaison with government agencies; (v) Spill response operations; (vi) Planning; (vii) Logistics support; and...

Top