Science.gov

Sample records for iii program scheduling

  1. Schedule-Organizer Computer Program

    NASA Technical Reports Server (NTRS)

    Collazo, Fernando F.

    1990-01-01

    Schedule Organizer provides simple method for generating distribution lists. Contains readers' names for each task schedule defined by input files. Schedule Organizer (SO), Schedule Tracker (ST) (COSMIC program MSC-21526), and Schedule Report Generator (SRG) (COSMIC program MSC-21527) computer programs manipulating data-base files in ways advantageous in scheduling. Written in PL/1 and DEC Command Language (DCL).

  2. Schedule-Tracker Computer Program

    NASA Technical Reports Server (NTRS)

    Collazo, Fernando F.

    1990-01-01

    Schedule Tracker provides effective method for tracking tasks "past due" and/or "near term". Generates reports for each responsible staff member having one or more assigned tasks falling within two listed categories. Schedule Organizer (SO) (COSMIC program MSC-21525), Schedule Tracker (ST), and Schedule Report Generator (SRG) (COSMIC program MSC-21527) computer programs manipulating data-base files in ways advantageous in scheduling. Written in PL/1 and DEC Command Language (DCL).

  3. SO - SCHEDULE ORGANIZER COMPUTER PROGRAM

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer SO, Schedule Tracker, ST (COSMIC Program MSC-21526), and Report Generator, SRG (COSMIC Program MSC-21527), are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Tracker provides an effective method for tracking tasks that are 'past due' and/or 'near term'. ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are scheduled for recent completion (near term). Schedule Report Generator provides a simple method for generating periodic schedule reports. SO contains the following primary menu that is displayed at the beginning of the program. The menu provides options: to write input files to an output distribution file, to change a schedule title field and/or distribution list field, to browse through the schedule and input names file for requested schedule numbers, to create an input names file and a schedule titles file, and to delete input schedule titles and associated names. SO provides a choice of two input files. One file holds twenty-five groups of up to twenty-five names for each group. The other file holds twenty-five records, each of which may hold a task schedule title. SO creates three output files. One holds the formatted list of schedule titles for printout. Another file holds the formatted distribution list for printout; there is one for each input names file schedule group. The third output file holds the last schedule title deleted by

  4. SO - SCHEDULE ORGANIZER COMPUTER PROGRAM

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer SO, Schedule Tracker, ST (COSMIC Program MSC-21526), and Report Generator, SRG (COSMIC Program MSC-21527), are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Tracker provides an effective method for tracking tasks that are 'past due' and/or 'near term'. ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are scheduled for recent completion (near term). Schedule Report Generator provides a simple method for generating periodic schedule reports. SO contains the following primary menu that is displayed at the beginning of the program. The menu provides options: to write input files to an output distribution file, to change a schedule title field and/or distribution list field, to browse through the schedule and input names file for requested schedule numbers, to create an input names file and a schedule titles file, and to delete input schedule titles and associated names. SO provides a choice of two input files. One file holds twenty-five groups of up to twenty-five names for each group. The other file holds twenty-five records, each of which may hold a task schedule title. SO creates three output files. One holds the formatted list of schedule titles for printout. Another file holds the formatted distribution list for printout; there is one for each input names file schedule group. The third output file holds the last schedule title deleted by

  5. ST - SCHEDULE TRACKER COMPUTER PROGRAM

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer, SO (COSMIC Program MSC-21525), Schedule Tracker, ST, and Schedule Report Generator, SRG (COSMIC Program MSC-21527), are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Tracker provides an effective method for tracking tasks that are 'past due' and/or 'near term'. ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are scheduled for recent completion (near term). Schedule Report Generator provides a simple method for generating periodic schedule reports. ST and SRG use the same data base file as input. The common data base file has a maximum number of 400 entries. The time span of all three programs is nineteen months. Both of these maximum numbers can be modified by the user. ST requires the VMS Operating System on DEC VAX and was written in PL/1 and DEC Command Language (DCL). The program requires a memory of 233KB. ST can be purchased separately or in a package (COSMIC Program COS-10021) containing SO, ST, and SRG. ST was developed in 1985.

  6. ST - SCHEDULE TRACKER COMPUTER PROGRAM

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer, SO (COSMIC Program MSC-21525), Schedule Tracker, ST, and Schedule Report Generator, SRG (COSMIC Program MSC-21527), are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Tracker provides an effective method for tracking tasks that are 'past due' and/or 'near term'. ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are scheduled for recent completion (near term). Schedule Report Generator provides a simple method for generating periodic schedule reports. ST and SRG use the same data base file as input. The common data base file has a maximum number of 400 entries. The time span of all three programs is nineteen months. Both of these maximum numbers can be modified by the user. ST requires the VMS Operating System on DEC VAX and was written in PL/1 and DEC Command Language (DCL). The program requires a memory of 233KB. ST can be purchased separately or in a package (COSMIC Program COS-10021) containing SO, ST, and SRG. ST was developed in 1985.

  7. S-CHART - SCHEDULING CHART PROGRAM

    NASA Technical Reports Server (NTRS)

    Klinkner, E. R.

    1994-01-01

    The Scheduling Chart Program (S-Chart) uses simple menu choices to produce high quality Gantt type scheduling and production time-line charts with minimal data entry requirements. The software produces high quality charts (20, 40, and 80 day options) in 10-20 minutes including start up, data entry, and printing. Reprints take less than one minute. Some of the more significant features are as follows: speed and ease of use with menu driven selections from start to finish, storage and catalogs of all data sets for rapid access and manipulation, compact program size to permit storage of dozens of data sets on the program disc, and creation of ASCII text files of graphs for rapid printing. The final product of the plot routine is an extended ASCII character file which shows the events scheduled and actual work dates. This file may be printed from the program, from DOS, or imported to a word processor for customizing. S-Chart is not intended to take the place of commercial scheduling/project management software. However, it is a simple, somewhat limited Gantt chart plotter and scheduling tracking program with an emphasis on straightforward data entry. There is no complex relationship building between the scheduled events. Dates are entered as dates, not as algebraic functions. All the files of S-Chart, except for the graph picture and the stand-alone executable, were written in 100% dBASE III compatible code. The executable code was created with CLIPPER and the graph picture files are written in ASCII code. S-Chart was implemented on an IBM PC series machine under DOS and requires 215k bytes of memory. The program was developed in 1988.

  8. S-CHART - SCHEDULING CHART PROGRAM

    NASA Technical Reports Server (NTRS)

    Klinkner, E. R.

    1994-01-01

    The Scheduling Chart Program (S-Chart) uses simple menu choices to produce high quality Gantt type scheduling and production time-line charts with minimal data entry requirements. The software produces high quality charts (20, 40, and 80 day options) in 10-20 minutes including start up, data entry, and printing. Reprints take less than one minute. Some of the more significant features are as follows: speed and ease of use with menu driven selections from start to finish, storage and catalogs of all data sets for rapid access and manipulation, compact program size to permit storage of dozens of data sets on the program disc, and creation of ASCII text files of graphs for rapid printing. The final product of the plot routine is an extended ASCII character file which shows the events scheduled and actual work dates. This file may be printed from the program, from DOS, or imported to a word processor for customizing. S-Chart is not intended to take the place of commercial scheduling/project management software. However, it is a simple, somewhat limited Gantt chart plotter and scheduling tracking program with an emphasis on straightforward data entry. There is no complex relationship building between the scheduled events. Dates are entered as dates, not as algebraic functions. All the files of S-Chart, except for the graph picture and the stand-alone executable, were written in 100% dBASE III compatible code. The executable code was created with CLIPPER and the graph picture files are written in ASCII code. S-Chart was implemented on an IBM PC series machine under DOS and requires 215k bytes of memory. The program was developed in 1988.

  9. Schedule-Report-Generator Computer Program

    NASA Technical Reports Server (NTRS)

    Collazo, Fernando F.

    1990-01-01

    Schedule Report Generator provides simple method for generating periodic schedule reports. Enables engineering manager to monitor tasks assigned to staff members on weekly basis. Sorts three types of reports by use of one or more data fields as sorting keys. Schedule Organizer (SO) (COSMIC program MSC-21525), Schedule Tracker (ST) (COSMIC program MSC-21526), and Schedule Report Generator (SRG) computer programs manipulating data-base files in ways advantageous in scheduling. Written in PL/1 and DEC Command Language (DCL).

  10. Scheduling: A guide for program managers

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The following topics are discussed concerning scheduling: (1) milestone scheduling; (2) network scheduling; (3) program evaluation and review technique; (4) critical path method; (5) developing a network; (6) converting an ugly duckling to a swan; (7) network scheduling problem; (8) (9) network scheduling when resources are limited; (10) multi-program considerations; (11) influence on program performance; (12) line-of-balance technique; (13) time management; (14) recapitulization; and (15) analysis.

  11. Schedules of controlled substances: rescheduling of hydrocodone combination products from schedule III to schedule II. Final rule.

    PubMed

    2014-08-22

    With the issuance of this final rule, the Administrator of the Drug Enforcement Administration reschedules hydrocodone combination products from schedule III to schedule II of the Controlled Substances Act. This scheduling action is pursuant to the Controlled Substances Act which requires that such actions be made on the record after opportunity for a hearing through formal rulemaking. This action imposes the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule II controlled substances on persons who handle (manufacture, distribute, dispense, import, export, engage in research, conduct instructional activities with, conduct chemical analysis with, or possess) or propose to handle hydrocodone combination products.

  12. Scheduling Guide for Program Managers

    DTIC Science & Technology

    2001-10-01

    and val- leys are evened out without scheduling more work than nine people can do. In this ex- ample, this rearrangement can be accom- plished quickly...full advantage of event- driven scheduling. Additional information on the development of IMSs can be found in various sections of the Defense

  13. 77 FR 60743 - Proposed Collection; Comment Request for Schedule F, Part II and III (Form 1040)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-04

    ... Internal Revenue Service Proposed Collection; Comment Request for Schedule F, Part II and III (Form 1040... Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning Schedule F... Number: Schedule F, Part II and III (Form 1040). Abstract: Schedule F, Part II and III (Form 1040)...

  14. SO/ST/SRG - SCHEDULING PROGRAMS

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer, SO (COSMIC Program MSC-21525), Schedule Tracker, ST (COSMIC Program MSC-21526), and Report Generator, SRG (COSMIC Program MSC-21527), are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Organizer contains a primary menu that is displayed at the beginning of the program. The menu provides options as follows: to write input files to an output distribution file, to change a schedule title field and/or distribution list field, to browse through the schedule and input names file for requested schedule numbers, to create an input names file and a schedule titles file, and to delete input schedule titles and associated names. SO provides a choice of two input files. One file holds 25 groups of up to 25 names for each group. The other file holds 25 records. Each 60-character-long record holds a task schedule title or it is a blank entry. SO creates three output files. One holds the formatted list of schedule titles for printout. Another file holds the formatted distribution list for printout. There is one for each input names file schedule group. The third output file holds the schedule title of the last schedule title file deleted by the user. Schedule Tracker provides an effective method for tracking tasks that are "past due" and/or "near term". ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are scheduled for recent completion (near term

  15. SO/ST/SRG - SCHEDULING PROGRAMS

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer, SO (COSMIC Program MSC-21525), Schedule Tracker, ST (COSMIC Program MSC-21526), and Report Generator, SRG (COSMIC Program MSC-21527), are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Organizer contains a primary menu that is displayed at the beginning of the program. The menu provides options as follows: to write input files to an output distribution file, to change a schedule title field and/or distribution list field, to browse through the schedule and input names file for requested schedule numbers, to create an input names file and a schedule titles file, and to delete input schedule titles and associated names. SO provides a choice of two input files. One file holds 25 groups of up to 25 names for each group. The other file holds 25 records. Each 60-character-long record holds a task schedule title or it is a blank entry. SO creates three output files. One holds the formatted list of schedule titles for printout. Another file holds the formatted distribution list for printout. There is one for each input names file schedule group. The third output file holds the schedule title of the last schedule title file deleted by the user. Schedule Tracker provides an effective method for tracking tasks that are "past due" and/or "near term". ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are scheduled for recent completion (near term

  16. SRG - SCHEDULE REPORT GENERATOR COMPUTER PROGRAM

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer, SO (COSMIC Program MSC-21525), Schedule Tracker, ST (COSMIC Program MSC-21526), and Schedule Report Generator, SRG, are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Tracker provides an effective method for tracking tasks that are 'past due' and/or 'near term'. ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are schedule for recent completion (near term). Schedule Reports Generator provides a simple method for generating periodic schedule reports. SRG enables an engineering manager to monitor tasks assigned to staff members on a weekly basis. SRG sorts three types of reports using one or more data fields as sort keys. One type is sorted using the calendar year as the primary key and the end date as the secondary key. Another type is sorted by flight number. A third type of report, Waterfall plots, is also generated by SRG using the end date as the sorting key. SRG requires as input a single file or two concatenated files with up to 400 single line entries. The user constructs the input file by using the LSE editor VAX utility prior to the execution of the program. The user is able to modify the current functional description text lines just displayed. ST and SRG use the same data base file as input. The common data base file has a maximum number of 400 entries. The time span of all three programs is nineteen months. Both of these maximum

  17. SRG - SCHEDULE REPORT GENERATOR COMPUTER PROGRAM

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer, SO (COSMIC Program MSC-21525), Schedule Tracker, ST (COSMIC Program MSC-21526), and Schedule Report Generator, SRG, are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Tracker provides an effective method for tracking tasks that are 'past due' and/or 'near term'. ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are schedule for recent completion (near term). Schedule Reports Generator provides a simple method for generating periodic schedule reports. SRG enables an engineering manager to monitor tasks assigned to staff members on a weekly basis. SRG sorts three types of reports using one or more data fields as sort keys. One type is sorted using the calendar year as the primary key and the end date as the secondary key. Another type is sorted by flight number. A third type of report, Waterfall plots, is also generated by SRG using the end date as the sorting key. SRG requires as input a single file or two concatenated files with up to 400 single line entries. The user constructs the input file by using the LSE editor VAX utility prior to the execution of the program. The user is able to modify the current functional description text lines just displayed. ST and SRG use the same data base file as input. The common data base file has a maximum number of 400 entries. The time span of all three programs is nineteen months. Both of these maximum

  18. Scheduling parallel programs in distributed systems

    SciTech Connect

    Rommel, C.G.

    1988-01-01

    Scheduling parallel programs under the processor-sharing discipline for uniprocessors, multiprocessors, and distributed systems was studied. Two classes of parallel programs are considered: those without any IPC (called Fork-Join jobs) and those with asynchronous and uniform IPC (called clusters). The study is divided into two parts: (1) develops analytical solutions for Fork-Join Jobs on uniprocessors and multiprocessors; and (2) develops and evaluates via simulation Fork-Join jobs and clusters on distributed systems. The types of site scheduling studied are TS-PS where tasks of a job are scheduled independently at processor-sharing servers, JS-PS in which tasks of a job are scheduled as a single entity at processor-sharing servers, and FCFS where tasks of a job are scheduled independently by order of arrival. For Poisson job arrivals and exponentially distributed task service times, analytical solutions and computationally efficient bounds were found for Fork-Join TS-PS and JS-PS job response times. An algorithm was developed to schedule parallel programs in distributed systems. Over a wide range of parameters the algorithms was found to be superior to both no-load balancing, NLB, and shortest-queue first scheduling, SQF.

  19. S-Chart - Scheduling-Chart Program

    NASA Technical Reports Server (NTRS)

    Klinkner, Eric R.

    1990-01-01

    Schedule Chart Program (S-Chart) produces quickly, through array of simple menu choices, high-quality Gantt-type scheduling and production time-line charts with minimal data-entry requirements. Significant features include: speed and ease of use with menu-driven selections from start to finish; storage and catalogs of all sets of data for rapid access and manipulation; compact program to permit storage of dozens of sets of data on program disk; and creation of ASCII text files of graphs for rapid printing. Written in ASCII code.

  20. Advanced Reactors Transition Program Resource Loaded Schedule

    SciTech Connect

    BOWEN, W.W.

    1999-11-08

    The Advanced Reactors Transition (ART) Resource Loaded Schedule (RLS) provides a cost and schedule baseline for managing the project elements within the ART Program. The Fast Flux Test Facility (FFTF) activities are delineated through the end of FY 2000, assuming continued standby. The Nuclear Energy (NE) Legacies and Plutonium Recycle Test Reactor (PRTR) activities are delineated through the end of the deactivation process. This document reflects the 1 Oct 1999 baseline.

  1. Advanced Reactors Transition Program Resource Loaded Schedule

    SciTech Connect

    GANTT, D.A.

    2000-01-12

    The Advanced Reactors Transition (ART) Resource Loaded Schedule (RLS) provides a cost and schedule baseline for managing the project elements within the ART Program. The Fast Flux Test Facility (FETF) activities are delineated through the end of FY 2000, assuming continued standby. The Nuclear Energy (NE) Legacies and Plutonium Recycle Test Reactor (PRTR) activities are delineated through the end of the deactivation process. This revision reflects the 19 Oct 1999 baseline.

  2. Scheduling Guide for Program Managers. Revision

    DTIC Science & Technology

    1994-07-01

    delivery schedule is often used.) "* Value of time . & A tough and disciplined approach to 7.1 PROGRAM MANAGER’S meeting the published schedule is required...7.3 VALUE OF TIME tal program cost is shown graphically in Figure 7-1. According to the late John H. Richardson, president of Hughes Aircraft Company...consideration. Concentration value of time in decision making all con- on the system or product often overlooks tribute to the manager’s repertoire of good a key

  3. An integrated scheduling and program management system

    NASA Astrophysics Data System (ADS)

    Porter, D.; Gibson, J. D.; Williams, G. G.

    2012-09-01

    An integrated scheduling and program management system is being developed for the MMT Observatory (MMTO), Arizona, USA. A systems engineering approach is used to combine existing and new relational databases, spreadsheets, file storage systems, and web-based user interfaces into a single unified system. An overview of software design, data management, user interfaces, and techniques for performance assessment is presented. Goals of this system include streamlined data management and an optimized user experience. The MMTO has over a dozen different telescope configurations, including three secondary mirrors and a wide range of observing instruments. Scheduling is complex for the varying telescope configurations, limited available observing time, and appropriate astronomic conditions (e.g., lunar phase) for each science project. Scheduled telescope configurations can be used to perform safety checks of actual configuration during telescope operations. Programmatic information is automatically input into nightly telescope operator (TO) logs by the system. The TO's provide additional information into the system on telescope usage, observing conditions (e.g., weather conditions), and observatory closure (e.g., from instrument malfunction or inclement weather). All of this information is synthesized to assess telescope and observatory performance. Web interfaces to the system can be used by observers to submit information, such as travel plans, instrumentation requirements, and observing catalogs. A service request (SR) (i.e., trouble report) system has also been developed for tracking operational issues. The specific needs of the MMTO have been met through in-house software development of this integrated scheduling and program management system.

  4. DSN seven day/twelve week schedule program

    NASA Technical Reports Server (NTRS)

    Holzman, R. E.

    1968-01-01

    Deep Space Network scheduling program allocates resources based on the users requirements. The system reviews and allocates the requests for equipment and resources. Depending upon the program input either the seven day or the twelve week schedule is generated.

  5. Runway Scheduling Using Generalized Dynamic Programming

    NASA Technical Reports Server (NTRS)

    Montoya, Justin; Wood, Zachary; Rathinam, Sivakumar

    2011-01-01

    A generalized dynamic programming method for finding a set of pareto optimal solutions for a runway scheduling problem is introduced. The algorithm generates a set of runway fight sequences that are optimal for both runway throughput and delay. Realistic time-based operational constraints are considered, including miles-in-trail separation, runway crossings, and wake vortex separation. The authors also model divergent runway takeoff operations to allow for reduced wake vortex separation. A modeled Dallas/Fort Worth International airport and three baseline heuristics are used to illustrate preliminary benefits of using the generalized dynamic programming method. Simulated traffic levels ranged from 10 aircraft to 30 aircraft with each test case spanning 15 minutes. The optimal solution shows a 40-70 percent decrease in the expected delay per aircraft over the baseline schedulers. Computational results suggest that the algorithm is promising for real-time application with an average computation time of 4.5 seconds. For even faster computation times, two heuristics are developed. As compared to the optimal, the heuristics are within 5% of the expected delay per aircraft and 1% of the expected number of runway operations per hour ad can be 100x faster.

  6. 21 CFR 1306.25 - Transfer between pharmacies of prescription information for Schedules III, IV, and V controlled...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... information for Schedules III, IV, and V controlled substances for refill purposes. 1306.25 Section 1306.25... information for Schedules III, IV, and V controlled substances for refill purposes. Link to an amendment... controlled substance listed in Schedules III, IV or V for the purpose of refill dispensing is...

  7. Program For Editing Graphical Displays Of Schedules

    NASA Technical Reports Server (NTRS)

    Mulnix, Cassie L.; Miller, Kevin

    1995-01-01

    XOPPS is window-based software tool from graphics providing easy and fast "what you see is what you get" (WYSIWYG) on-screen editing capabilities. Provides area, analogous to canvas, displaying full image of schedule being edited. Canvas contains header area (for test) and schedule area (for plotting graphical representations of milestone objects in flexible time line). Written in C language.

  8. Program For Editing Graphical Displays Of Schedules

    NASA Technical Reports Server (NTRS)

    Mulnix, Cassie L.; Miller, Kevin

    1995-01-01

    XOPPS is window-based software tool from graphics providing easy and fast "what you see is what you get" (WYSIWYG) on-screen editing capabilities. Provides area, analogous to canvas, displaying full image of schedule being edited. Canvas contains header area (for test) and schedule area (for plotting graphical representations of milestone objects in flexible time line). Written in C language.

  9. Master schedule for CY-1981 Hanford environmental surveillance routine program

    SciTech Connect

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.

    1980-12-01

    The current schedule of data collection for the routine environmental surveillance program at the Hanford Site is provided. Questions about specific entries should be referred to the authors since modifications to the schedule are made during the year and special areas of study, usually of short duration, are not scheduled. The environmental surveillance program objectives are to evaluate the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in Manual Chapter 0513, and to monitor Hanford operations for compliance with applicable environmental criteria given in Manual Chapter 0524 and Washington State Water Quality Standards. Air quality data obtained in a separate program are also reported. The collection schedule for potable water is shown but it is not part of the routine environmental surveillance program. Schedules are presented for the following subjects: air, Columbia River, sanitary water, surface water, ground water, foodstuffs, wildlife, soil and vegetation, external radiation measurement, portable instrument surveys, and surveillance of waste disposal sites. (JGB)

  10. Developing optimal nurses work schedule using integer programming

    NASA Astrophysics Data System (ADS)

    Shahidin, Ainon Mardhiyah; Said, Mohd Syazwan Md; Said, Noor Hizwan Mohamad; Sazali, Noor Izatie Amaliena

    2017-08-01

    Time management is the art of arranging, organizing and scheduling one's time for the purpose of generating more effective work and productivity. Scheduling is the process of deciding how to commit resources between varieties of possible tasks. Thus, it is crucial for every organization to have a good work schedule for their staffs. The job of Ward nurses at hospitals runs for 24 hours every day. Therefore, nurses will be working using shift scheduling. This study is aimed to solve the nurse scheduling problem at an emergency ward of a private hospital. A 7-day work schedule for 7 consecutive weeks satisfying all the constraints set by the hospital will be developed using Integer Programming. The work schedule for the nurses obtained gives an optimal solution where all the constraints are being satisfied successfully.

  11. Comprehensive School Transformation, Phase III. Program Evaluation.

    ERIC Educational Resources Information Center

    Prine, Donald; Wilkinson, David

    The Iowa Educational Excellence Act and its amendments provide for four types of Phase III programs: performance-based pay, supplemental pay, a combination of both, or comprehensive school transformation. In 1993, the Des Moines Phase III program, which originated as a combination of performance-based pay and supplemental pay, changed to a…

  12. A comparison of procedures for programming noncontingent reinforcement schedules.

    PubMed

    Kahng, S W; Iwata, B A; DeLeon, I G; Wallace, M D

    2000-01-01

    We compared two methods for programming and thinning noncontingent reinforcement (NCR) schedules during the treatment of self-injurious behavior (SIB). The participants were 3 individuals who had been diagnosed with mental retardation. Results of functional analyses indicated that all participants' SIB was maintained by positive reinforcement (i.e., access to attention or food). Following baseline, the effects of two NCR schedule-thinning procedures were compared in multielement designs. One schedule (fixed increment) was initially set at fixed-time 10-s reinforcer deliveries and was also thinned according to fixed-time intervals. The other schedule (adjusting IRT) was initially determined by participants' baseline interresponse times (IRTs) for SIB and was thinned based on IRTs observed during subsequent treatment sessions. Results indicated that both schedules were effective in initially reducing SIB and in maintaining response suppression as the schedules were thinned.

  13. Master schedule for CY-1982 Hanford environmental surveillance routine program

    SciTech Connect

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.

    1981-12-01

    This report provides the current schedule of data collection for the routine environmental surveillance program at the Hanford Site. The environmental surveillance program objectives are to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5484.1. The routine sampling schedule provided does not include samples which are planned to be collected during FY-1982 in support of special studies or for quality control purposes. In addition, the routine program outlined in this schedule is subject to modification during the year in response to changes in Site operations, program requirements, or unusual sample results. Sampling schedules are presented for the following: air; Columbia River; sanitary water; surface water; ground water; foodstuffs; wildlife; soil and vegetation; external radiation measurements; portable instrument surveys; and surveillance of waste disposal sites. (ATT)

  14. Explorations: Title III ESEA Programs in Iowa.

    ERIC Educational Resources Information Center

    Iowa State Dept. of Public Instruction, Des Moines.

    Seventy projects funded by the Elementary and Secondary Education Act, Title III, and providing the funds to public school districts to demonstrate the feasibility of educational innovations, are described in this document about Iowa Title III exemplary programs. Projects are subdivided according to planning grants, operational grants, guidance…

  15. International Space Programs. Aerospace Education III.

    ERIC Educational Resources Information Center

    Bulmer, S. B.

    This book, one in the series on Aerospace Education III, is a collection of the diverse information available regarding the international space programs. The five goals listed for the book are: to examine the Soviet space program, to understand the future of Soviet space activity, to examine other national and international space programs, to…

  16. 33 CFR Schedule III to Subpart A... - Calling-in Table

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... to Subpart A of Part 401 Navigation and Navigable Waters SAINT LAWRENCE SEAWAY DEVELOPMENT... Schedule III to Subpart A of Part 401—Calling-in Table C.I.P. and checkpoint Station to call Message... 1. Name of vessel.2. Location. 3. ETA Cape Vincent or River Port. 15. Whale back Shoal—Con...

  17. Scheduling IT Staff at a Bank: A Mathematical Programming Approach

    PubMed Central

    Labidi, M.; Mrad, M.; Gharbi, A.; Louly, M. A.

    2014-01-01

    We address a real-world optimization problem: the scheduling of a Bank Information Technologies (IT) staff. This problem can be defined as the process of constructing optimized work schedules for staff. In a general sense, it requires the allocation of suitably qualified staff to specific shifts to meet the demands for services of an organization while observing workplace regulations and attempting to satisfy individual work preferences. A monthly shift schedule is prepared to determine the shift duties of each staff considering shift coverage requirements, seniority-based workload rules, and staff work preferences. Due to the large number of conflicting constraints, a multiobjective programming model has been proposed to automate the schedule generation process. The suggested mathematical model has been implemented using Lingo software. The results indicate that high quality solutions can be obtained within a few seconds compared to the manually prepared schedules. PMID:24772032

  18. Scheduling IT staff at a bank: a mathematical programming approach.

    PubMed

    Labidi, M; Mrad, M; Gharbi, A; Louly, M A

    2014-01-01

    We address a real-world optimization problem: the scheduling of a Bank Information Technologies (IT) staff. This problem can be defined as the process of constructing optimized work schedules for staff. In a general sense, it requires the allocation of suitably qualified staff to specific shifts to meet the demands for services of an organization while observing workplace regulations and attempting to satisfy individual work preferences. A monthly shift schedule is prepared to determine the shift duties of each staff considering shift coverage requirements, seniority-based workload rules, and staff work preferences. Due to the large number of conflicting constraints, a multiobjective programming model has been proposed to automate the schedule generation process. The suggested mathematical model has been implemented using Lingo software. The results indicate that high quality solutions can be obtained within a few seconds compared to the manually prepared schedules.

  19. Solving cyclical nurse scheduling problem using preemptive goal programming

    NASA Astrophysics Data System (ADS)

    Sundari, V. E.; Mardiyati, S.

    2017-07-01

    Nurse scheduling system in a hospital is being modeled as a preemptive goal programming problem that is solved by using LINGO software with the objective function to minimize deviation variable at each goal. The scheduling is done cyclically, so every nurse is treated fairly since they have the same work shift portion with the other nurses. By paying attention to the hospital's rules regarding nursing work shift cyclically, it can be obtained that numbers of nurse needed in every ward are 18 nurses and the numbers of scheduling periods are 18 periods where every period consists of 21 days.

  20. Assessing Weapon System Acquisition Cycle Times: Setting Program Schedules

    DTIC Science & Technology

    2015-06-01

    and control schedules? Once an acquisition program is established, what role does the requirements community play in decisions affecting program...requirements communities and acquisition communities . In coordination with the sponsor, the team selected a small set of MDAPs for in-depth... community used to set times when capabilities are needed and how those parameters are ultimately used by the acquisition process to establish program

  1. TRU Waste Management Program cost/schedule optimization analysis

    SciTech Connect

    Detamore, J.A. . Joint Integration Office); Raudenbush, M.H.; Wolaver, R.W.; Hastings, G.A. Corp., Boulder, CO )

    1985-10-01

    The cost/schedule optimization task is a necessary function to insure that program goals and plans are optimized from a cost and schedule aspect. Results of this study will offer DOE information with which it can establish, within institutional constraints, the most efficient program for the long-term management and disposal of contact handled transuranic waste (CH-TRU). To this end, a comprehensive review of program cost/schedule tradeoffs has been made, to identify any major cost saving opportunities that may be realized by modification of current program plans. It was decided that all promising scenarios would be explored, and institutional limitations to implementation would be described. Since a virtually limitless number of possible scenarios can be envisioned, it was necessary to distill these possibilities into a manageable number of alternatives. The resultant scenarios were described in the cost/schedule strategy and work plan document. Each scenario was compared with the base case: waste processing at the originating site; transport of CH-TRU wastes in TRUPACT; shipment of drums in 6-Packs; 25 year stored waste workoff; WIPP operational 10/88, with all sites shipping to WIPP beginning 10/88; and no processing at WIPP. Major savings were identified in two alternate scenarios: centralize waste processing at INEL and eliminate rail shipment of TRUPACT. No attempt was made to calculate savings due to combination of scenarios. 1 ref., 5 figs., 1 tab. (MHB)

  2. Healdsburg Bilingual Education. Content Analysis Schedule for Bilingual Education Programs.

    ERIC Educational Resources Information Center

    Hess, Richard T.; Shore, Marietta Saravia

    This content analysis schedule for the Bilingual Education Program of the Healdsburg Union Elementary School District of Healdsburg, California, presents information on the history, funding, and scope of the project in its second year. Included are sociolinguistic process variables such as the native and dominant languages of students and their…

  3. 21 CFR 1312.30 - Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 9 2014-04-01 2014-04-01 false Schedule III, IV, and V non-narcotic controlled... Controlled Substances § 1312.30 Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit. The following Schedule III, IV, and V non-narcotic controlled substances have...

  4. 21 CFR 1312.30 - Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 9 2012-04-01 2012-04-01 false Schedule III, IV, and V non-narcotic controlled... Controlled Substances § 1312.30 Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit. The following Schedule III, IV, and V non-narcotic controlled substances have...

  5. 21 CFR 1312.30 - Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 9 2011-04-01 2011-04-01 false Schedule III, IV, and V non-narcotic controlled... Controlled Substances § 1312.30 Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit. The following Schedule III, IV, and V non-narcotic controlled substances have...

  6. 21 CFR 1312.30 - Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule III, IV, and V non-narcotic controlled... Controlled Substances § 1312.30 Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit. The following Schedule III, IV, and V non-narcotic controlled substances have...

  7. 21 CFR 1312.30 - Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 9 2013-04-01 2013-04-01 false Schedule III, IV, and V non-narcotic controlled... Controlled Substances § 1312.30 Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit. The following Schedule III, IV, and V non-narcotic controlled substances have...

  8. Schedule-Driven Costs in Major Defense Programs

    DTIC Science & Technology

    2012-04-30

    better understanding of full requirements to be inserted in future baselines. Technology in the initial design would be at a higher readiness level...Researchers would benefit from better quality and more accessible program data on cost, schedule, and performance to allow them to examine relationships ...given better -quality research on program trends and relationships . Future Research In the future, each of the propositions enumerated in this paper

  9. Microgrid Reliability Modeling and Battery Scheduling Using Stochastic Linear Programming

    SciTech Connect

    Cardoso, Goncalo; Stadler, Michael; Siddiqui, Afzal; Marnay, Chris; DeForest, Nicholas; Barbosa-Povoa, Ana; Ferrao, Paulo

    2013-05-23

    This paper describes the introduction of stochastic linear programming into Operations DER-CAM, a tool used to obtain optimal operating schedules for a given microgrid under local economic and environmental conditions. This application follows previous work on optimal scheduling of a lithium-iron-phosphate battery given the output uncertainty of a 1 MW molten carbonate fuel cell. Both are in the Santa Rita Jail microgrid, located in Dublin, California. This fuel cell has proven unreliable, partially justifying the consideration of storage options. Several stochastic DER-CAM runs are executed to compare different scenarios to values obtained by a deterministic approach. Results indicate that using a stochastic approach provides a conservative yet more lucrative battery schedule. Lower expected energy bills result, given fuel cell outages, in potential savings exceeding 6percent.

  10. Synchronizing production and air transportation scheduling using mathematical programming models

    NASA Astrophysics Data System (ADS)

    Zandieh, M.; Molla-Alizadeh-Zavardehi, S.

    2009-08-01

    Traditional scheduling problems assume that there are always infinitely many resources for delivering finished jobs to their destinations, and no time is needed for their transportation, so that finished products can be transported to customers without delay. So, for coordination of these two different activities in the implementation of a supply chain solution, we studied the problem of synchronizing production and air transportation scheduling using mathematical programming models. The overall problem is decomposed into two sub-problems, which consists of air transportation allocation problem and a single machine scheduling problem which they are considered together. We have taken into consideration different constraints and assumptions in our modeling such as special flights, delivery tardiness and no delivery tardiness. For these purposes, a variety of models have been proposed to minimize supply chain total cost which encompass transportation, makespan, delivery earliness tardiness and departure time earliness tardiness costs.

  11. A Mixed Integer Linear Program for Airport Departure Scheduling

    NASA Technical Reports Server (NTRS)

    Gupta, Gautam; Jung, Yoon Chul

    2009-01-01

    Aircraft departing from an airport are subject to numerous constraints while scheduling departure times. These constraints include wake-separation constraints for successive departures, miles-in-trail separation for aircraft bound for the same departure fixes, and time-window or prioritization constraints for individual flights. Besides these, emissions as well as increased fuel consumption due to inefficient scheduling need to be included. Addressing all the above constraints in a single framework while allowing for resequencing of the aircraft using runway queues is critical to the implementation of the Next Generation Air Transport System (NextGen) concepts. Prior work on airport departure scheduling has addressed some of the above. However, existing methods use pre-determined runway queues, and schedule aircraft from these departure queues. The source of such pre-determined queues is not explicit, and could potentially be a subjective controller input. Determining runway queues and scheduling within the same framework would potentially result in better scheduling. This paper presents a mixed integer linear program (MILP) for the departure-scheduling problem. The program takes as input the incoming sequence of aircraft for departure from a runway, along with their earliest departure times and an optional prioritization scheme based on time-window of departure for each aircraft. The program then assigns these aircraft to the available departure queues and schedules departure times, explicitly considering wake separation and departure fix restrictions to minimize total delay for all aircraft. The approach is generalized and can be used in a variety of situations, and allows for aircraft prioritization based on operational as well as environmental considerations. We present the MILP in the paper, along with benefits over the first-come-first-serve (FCFS) scheme for numerous randomized problems based on real-world settings. The MILP results in substantially reduced

  12. Energy-optimal programming and scheduling of the manufacturing operations

    NASA Astrophysics Data System (ADS)

    Badea, N.; Frumuşanu, G.; Epureanu, A.

    2016-08-01

    The shop floor energy system covers the energy consumed for both the air conditioning and manufacturing processes. At the same time, most of energy consumed in manufacturing processes is converted in heat released in the shop floor interior and has a significant influence on the microclimate. Both these components of the energy consumption have a time variation that can be realistic assessed. Moreover, the consumed energy decisively determines the environmental sustainability of the manufacturing operation, while the expenditure for running the shop floor energy system is a significant component of the manufacturing operations cost. Finally yet importantly, the energy consumption can be fundamentally influenced by properly programming and scheduling of the manufacturing operations. In this paper, we present a method for modeling and energy-optimal programming & scheduling the manufacturing operations. In this purpose, we have firstly identified two optimization targets, namely the environmental sustainability and the economic efficiency. Then, we have defined three optimization criteria, which can assess the degree of achieving these targets. Finally, we have modeled the relationship between the optimization criteria and the parameters of programming and scheduling. In this way, it has been revealed that by adjusting these parameters one can significantly improve the sustainability and efficiency of manufacturing operations. A numerical simulation has proved the feasibility and the efficiency of the proposed method.

  13. TRU Waste Management Program. Cost/schedule optimization analysis

    SciTech Connect

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.; Hastings, G.A.

    1985-10-01

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.

  14. Space station program phase B definition: Nuclear reactor-powered space station cost and schedules

    NASA Technical Reports Server (NTRS)

    1971-01-01

    Tabulated data are presented on the costs, schedules, and technical characteristics for the space station phases C and D program. The work breakdown structure, schedule data, program ground rules, program costs, cost-estimating rationale, funding schedules, and supporting data are included.

  15. Overview of the Demo III UGV program

    NASA Astrophysics Data System (ADS)

    Shoemaker, Chuck M.; Bornstein, Jonathan A.

    1998-08-01

    Planning for future military capabilities assumes the availability of highly mobile, agile, rapidly deployable forces. Incorporation of robotic systems into future force structure to reduce casualties, increase tactical reach, counter battle fatigue, and reduce logistics burdens for rapid reaction forces offers one potential pathway for achieving this goal. The Demo III Unmanned Ground Vehicle Program is designed to advance and demonstrate the technology required to develop future unmanned ground combat vehicles through three major thrusts: (1) concerted technology development; (2) modeling, simulation and experimentation; and (3) technology integration and evaluation with users. Demo III focuses on demonstration of technology that will enable the development of small, highly agile, unmanned vehicles capable of off-road, semi- autonomous operation at speeds of up to 32 km/hr during daylight and 16 km/hr at night by summer 2001.

  16. Predicting Schedule Duration for Defense Acquisition Programs: Program Initiation to Initial Operational Capability

    DTIC Science & Technology

    2016-03-24

    optimizing costs , rather than schedule. Current Air Force practice is for cost estimators to either rely on subject matter expert (SME) opinion to evaluate...program, they also acknowledge that this does not account for any cost or schedule growth which exists between the aircraft program’s first and latest...significance in the sheer 69 amount of money a program has at MS-B start. It produces a slight additive factor, as to account for cost growth seen in

  17. Schedule Optimization Study, Hanford RI/FS Program

    SciTech Connect

    Not Available

    1992-12-01

    A Schedule Optimization Study (SOS) of the US Department of Energy (DOE) Hanford Site Remedial Investigation/Feasibility Study (RI/FS) Program was conducted by an independent team of professionals from other federal agencies and the private sector experienced in environmental restoration. This team spent two weeks at Hanford in September 1992 examining the reasons for the lengthy RI/FS process at Hanford and developing recommendations to expedite the process. The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit RI/FS Work Plan. This report documents the study called for in the August 29, 1991, Dispute Resolution Committee Decision Statement. Battelle's Environmental Management Operations (EMO) coordinated the effort for DOE's Richland Field Office (RL).

  18. Mixed Integer Programming and Heuristic Scheduling for Space Communication Networks

    NASA Technical Reports Server (NTRS)

    Cheung, Kar-Ming; Lee, Charles H.

    2012-01-01

    We developed framework and the mathematical formulation for optimizing communication network using mixed integer programming. The design yields a system that is much smaller, in search space size, when compared to the earlier approach. Our constrained network optimization takes into account the dynamics of link performance within the network along with mission and operation requirements. A unique penalty function is introduced to transform the mixed integer programming into the more manageable problem of searching in a continuous space. The constrained optimization problem was proposed to solve in two stages: first using the heuristic Particle Swarming Optimization algorithm to get a good initial starting point, and then feeding the result into the Sequential Quadratic Programming algorithm to achieve the final optimal schedule. We demonstrate the above planning and scheduling methodology with a scenario of 20 spacecraft and 3 ground stations of a Deep Space Network site. Our approach and framework have been simple and flexible so that problems with larger number of constraints and network can be easily adapted and solved.

  19. Mixed Integer Programming and Heuristic Scheduling for Space Communication Networks

    NASA Technical Reports Server (NTRS)

    Cheung, Kar-Ming; Lee, Charles H.

    2012-01-01

    We developed framework and the mathematical formulation for optimizing communication network using mixed integer programming. The design yields a system that is much smaller, in search space size, when compared to the earlier approach. Our constrained network optimization takes into account the dynamics of link performance within the network along with mission and operation requirements. A unique penalty function is introduced to transform the mixed integer programming into the more manageable problem of searching in a continuous space. The constrained optimization problem was proposed to solve in two stages: first using the heuristic Particle Swarming Optimization algorithm to get a good initial starting point, and then feeding the result into the Sequential Quadratic Programming algorithm to achieve the final optimal schedule. We demonstrate the above planning and scheduling methodology with a scenario of 20 spacecraft and 3 ground stations of a Deep Space Network site. Our approach and framework have been simple and flexible so that problems with larger number of constraints and network can be easily adapted and solved.

  20. Schedule Best Practices Provide Opportunity to Enhance Missile Defense Agency Accountability and Program Execution

    DTIC Science & Technology

    2012-07-19

    accountability of MDA programs, in the April 2012 review; instead, we are providing in this report (1) the results of how the MDA program schedules compare...developed for several months at a time instead of for the life of the program. As a result, our findings on the specific program schedules are limited...practices, and some had major deficiencies. These results are significant because a reliable schedule is one key factor that indicates a program is

  1. Planning and scheduling highway construction using GIS and dynamic programming

    NASA Astrophysics Data System (ADS)

    Hassanein, Ahmed

    This study presents a model to plan, schedule and control the construction of highway projects. A two-state-variable, N-stage dynamic programming procedure, in conjunction with a set of heuristic rules, is capable of generating schedules to meet a specified budget or duration restraints, and can select the optimum expediting technique to reduce project duration. The proposed model incorporates both typical (equal quantity of work in all units) and non-typical (varying quantities along highway length) repetitive activities in the optimization procedure. The proposed model accounts for the impact of practical factors, such as transverse obstructions, on crew assignment and project duration and cost. The impact of inclement weather on crew productivity is accounted for, as well as the beneficial effects of the learning curve. A relational database model is developed to store: (1) local weather conditions, (2) swell and shrinkage factors for various soil types, and (3) the available resource pool. The model supports tracking and controlling project progress utilising the earned value concept. A flexible and practical methodology is proposed to forecast project time and cost at completion, enabling the assignment of a higher weight to recent crew performance. A prototype software based on the model is developed, coded in Visual C++ (version 6.0), employing object oriented programming. ArcViewRTM version 3.1 is employed as the GIS engine, and the 3-D data analysis is carried out employing ArcViewRTM 3D Analyst. (Abstract shortened by UMI.)

  2. 21 CFR 1301.28 - Exemption from separate registration for practitioners dispensing or prescribing Schedule III, IV...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... practitioners dispensing or prescribing Schedule III, IV, or V narcotic controlled drugs approved by the Food..., or V narcotic controlled drugs approved by the Food and Drug Administration specifically for use in..., IV, or V narcotic controlled drugs or combinations of narcotic controlled drugs which have been...

  3. 21 CFR 1301.28 - Exemption from separate registration for practitioners dispensing or prescribing Schedule III, IV...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... practitioners dispensing or prescribing Schedule III, IV, or V narcotic controlled drugs approved by the Food..., or V narcotic controlled drugs approved by the Food and Drug Administration specifically for use in..., IV, or V narcotic controlled drugs or combinations of narcotic controlled drugs which have been...

  4. 21 CFR 1301.28 - Exemption from separate registration for practitioners dispensing or prescribing Schedule III, IV...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... practitioners dispensing or prescribing Schedule III, IV, or V narcotic controlled drugs approved by the Food..., or V narcotic controlled drugs approved by the Food and Drug Administration specifically for use in..., IV, or V narcotic controlled drugs or combinations of narcotic controlled drugs which have been...

  5. 21 CFR 1301.28 - Exemption from separate registration for practitioners dispensing or prescribing Schedule III, IV...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... practitioners dispensing or prescribing Schedule III, IV, or V narcotic controlled drugs approved by the Food..., or V narcotic controlled drugs approved by the Food and Drug Administration specifically for use in..., IV, or V narcotic controlled drugs or combinations of narcotic controlled drugs which have been...

  6. 21 CFR 1301.28 - Exemption from separate registration for practitioners dispensing or prescribing Schedule III, IV...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... practitioners dispensing or prescribing Schedule III, IV, or V narcotic controlled drugs approved by the Food..., or V narcotic controlled drugs approved by the Food and Drug Administration specifically for use in..., IV, or V narcotic controlled drugs or combinations of narcotic controlled drugs which have been...

  7. 21 CFR 1306.25 - Transfer between pharmacies of prescription information for Schedules III, IV, and V controlled...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 9 2011-04-01 2011-04-01 false Transfer between pharmacies of prescription... Substances Listed in Schedules III, IV, and V § 1306.25 Transfer between pharmacies of prescription... purpose of refill dispensing is permissible between pharmacies on a one-time basis only....

  8. 21 CFR 1306.25 - Transfer between pharmacies of prescription information for Schedules III, IV, and V controlled...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 9 2012-04-01 2012-04-01 false Transfer between pharmacies of prescription... Substances Listed in Schedules III, IV, and V § 1306.25 Transfer between pharmacies of prescription... purpose of refill dispensing is permissible between pharmacies on a one-time basis only. However...

  9. Effects on Students of a 4 X 4 Junior High School Block Scheduling Program.

    ERIC Educational Resources Information Center

    Cobb, R. Brian; Abate, Stacey; Baker, Dennis

    1999-01-01

    Investigated the effects of a 4 X 4 block scheduling program on a variety of student measures in a middle school with 355 block-scheduled students, some of whom were in high school at the time of the study. Results of the block scheduling were generally consistent with existing literature and generally positive. (SLD)

  10. Project Scheduling Tool for Maintaining Capability Interdependencies and Defence Program Investment: A User’s Guide

    DTIC Science & Technology

    2014-09-01

    UNCLASSIFIED Project Scheduling Tool for Maintaining Capability Interdependencies and Defence Program Investment: A User’s Guide M.-T. Nguyen Joint...product, the Project Scheduling Tool (version 1.4). The tool implements various mathematical Integer Linear Programming models, as well as an approach that...Scheduling Tool for Maintaining Capability Interdependencies and Defence Program Investment: A User’s Guide Executive Summary Defence decision-makers are faced

  11. The Role of Television Program Content and Scheduling in Patterns of Choice.

    ERIC Educational Resources Information Center

    Anast, Adrian; Webster, James Garrison

    A study investigated the influence of television program type and scheduling characteristics on patterns of program choice. The problem to be explored was the relative contribution of program content to patterns of audience flow. Soap operas were scheduled on competing channels with the assumption that audience duplication between pairs of these…

  12. Hanford Environmental Monitoring Program schedule for samples, analyses, and measurements for calendar year 1985

    SciTech Connect

    Blumer, P.J.; Price, K.R.; Eddy, P.A.; Carlile, J.M.V.

    1984-12-01

    This report provides the CY 1985 schedule of data collection for the routine Hanford Surface Environmental Monitoring and Ground-Water Monitoring Programs at the Hanford Site. The purpose is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5484.1. The routine sampling schedule provided herein does not include samples scheduled to be collected during FY 1985 in support of special studies, special contractor support programs, or for quality control purposes. In addition, the routine program outlined in this schedule is subject to modification during the year in response to changes in site operations, program requirements, or unusual sample results.

  13. Advanced Emissions Control Development Program: Phase III

    SciTech Connect

    G.T. Amrhein; R.T. Bailey; W. Downs; M.J. Holmes; G.A. Kudlac; D.A. Madden

    1999-07-01

    The primary objective of the Advanced Emissions Control Development Program (AECDP) is to develop practical, cost-effective strategies for reducing the emissions of air toxics from coal-fired boilers. The project goal is to effectively control air toxic emissions through the use of conventional flue gas clean-up equipment such as electrostatic precipitators (ESPs), fabric filters (baghouses - BH), and wet flue gas desulfurization systems (WFGD). Development work concentrated on the capture of trace metals, fine particulate, hydrogen chloride and hydrogen fluoride, with an emphasis on the control of mercury. The AECDP project is jointly funded by the US Department of Energy's Federal Energy Technology Center (DOE), the Ohio Coal Development Office within the Ohio Department of Development (OCDO), and Babcock and Wilcox, a McDermott company (B and W). This report discusses results of all three phases of the AECDP project with an emphasis on Phase III activities. Following the construction and evaluation of a representative air toxics test facility in Phase I, Phase II focused on characterization of the emissions of mercury and other air toxics and the control of these emissions for typical operating conditions of conventional flue gas clean-up equipment. Some general comments that can be made about the control of air toxics while burning a high-sulfur bituminous coal are as follows: (1) particulate control devices such as ESP's and baghouses do a good job of removing non-volatile trace metals, (2) particulate control devices (ESPs and baghouses) effectively remove the particulate-phase mercury, but the particulate-phase mercury was only a small fraction of the total for the coals tested, (3) wet scrubbing can effectively remove hydrogen chloride and hydrogen fluoride, and (4) wet scrubbers show good potential for the removal of mercury when operated under certain conditions, however, for certain applications, system enhancements can be required to achieve high

  14. The Savannah River Site`s groundwater monitoring program: 1990 sampling schedule

    SciTech Connect

    Rogers, C.D.

    1991-02-07

    This schedule provides a final record of the 1990 sampling schedule for the SRS groundwater monitoring program conducted by the Environmental Protection Department/Environmental Section (EPD/EMS). It includes all the wells monitored by EPD/EMS at SRS during 1990 and identifies the constituents sampled, the sampling frequency, and the reasons for sampling. Sampling requests are incorporated into the schedule throughout the year. Drafts of the schedule are produced and revised quarterly.

  15. Santa Fe Bilingual-Bicultural Education Program. Content Analysis Schedule for Bilingual Education Programs.

    ERIC Educational Resources Information Center

    Ludanyi, R. P.; Ehrlich, Roselin

    This content analysis schedule for the Santa Fe Bilingual-Bicultural Education Program of Santa Fe, New Mexico, presents information on the history, funding, and scope of the project in its second year. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is…

  16. Content Analysis Schedule for Bilingual Education Programs: Del Valle Bilingual Education Program.

    ERIC Educational Resources Information Center

    Ehrlich, Roselin; Shore, Marietta Saravia

    This content analysis schedule for the Del Valle Bilingual Education Program of Del Valle, Texas, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the…

  17. Phoenix Union Bilingual Program. Content Analysis Schedule for Bilingual Education Programs.

    ERIC Educational Resources Information Center

    Nafus, C.; Shore, Marietta Saravia

    This content analysis schedule for the Phoenix Union Bilingual Program of Phoenix, Arizona, presents information on the history, funding, and scope of the project in its third year. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection…

  18. Mixed Integer Programming and Heuristic Scheduling for Space Communication

    NASA Technical Reports Server (NTRS)

    Lee, Charles H.; Cheung, Kar-Ming

    2013-01-01

    Optimal planning and scheduling for a communication network was created where the nodes within the network are communicating at the highest possible rates while meeting the mission requirements and operational constraints. The planning and scheduling problem was formulated in the framework of Mixed Integer Programming (MIP) to introduce a special penalty function to convert the MIP problem into a continuous optimization problem, and to solve the constrained optimization problem using heuristic optimization. The communication network consists of space and ground assets with the link dynamics between any two assets varying with respect to time, distance, and telecom configurations. One asset could be communicating with another at very high data rates at one time, and at other times, communication is impossible, as the asset could be inaccessible from the network due to planetary occultation. Based on the network's geometric dynamics and link capabilities, the start time, end time, and link configuration of each view period are selected to maximize the communication efficiency within the network. Mathematical formulations for the constrained mixed integer optimization problem were derived, and efficient analytical and numerical techniques were developed to find the optimal solution. By setting up the problem using MIP, the search space for the optimization problem is reduced significantly, thereby speeding up the solution process. The ratio of the dimension of the traditional method over the proposed formulation is approximately an order N (single) to 2*N (arraying), where N is the number of receiving antennas of a node. By introducing a special penalty function, the MIP problem with non-differentiable cost function and nonlinear constraints can be converted into a continuous variable problem, whose solution is possible.

  19. A Program for Scheduling a Patrol Air Wing Training Plan

    DTIC Science & Technology

    1988-06-01

    techniques can be 7 found in production scheduling. Production-oriented techniques have limited application beyond a production setting . General scheduling...time of two to three weeks. The NTPI lasts two working days. The squadron is inspected to ensure compliance with the regulations set forth by the...earmark(vp47,ewm,[15,oct,1985]). The Training Officer uses a similar flag when he initially sets up his scheduling chart by marking the latest date each

  20. Medicare program; schedule of limits on home health agency costs per visit for cost reporting periods beginning on or after July 1, 1993--HCFA. Notice with comment period.

    PubMed

    1993-07-08

    This notice sets forth a revised schedule of limits on home health agency costs that may be paid under the Medicare program. As required by section 1861(v)(1)(L)(iii) of the Social Security Act (the Act), these limits are based on the current hospital wage index.

  1. Conflicts of Time: Examining School Schedules in Secondary Agricultural Programs

    ERIC Educational Resources Information Center

    Epps, Rebekah B.; Adams, Randy J.; Vincent, Stacy K.

    2015-01-01

    The purpose of this study was to examine how school schedules can or cannot be justified through the perspective of student performance on state core content assessments and occupational skills standards assessments. This study utilized the Theory of Power in Education when considering school schedules as a means to student success on core content…

  2. Event-Centered Scheduling Program: The Need for PERT (Program Evaluation Review Technique) in C-141 ISO Inspection Management

    DTIC Science & Technology

    1988-04-01

    1925 TITLE EVENT-CENTERED SCHEDULING PROGRAM: THE NEED FOR PERT IN C-141 ISO INSPECTION MANAGEMENT AUTHOR(S) MAJOR KENT A. MUELLER, USAF FACULTY...UNCLASSIFIED EVENT-CENTERED SCHEDULING PROGRAM: THE NEED FOR PERT IN C-141 ISO MANAGEMENT 12. PERSONAL AUTHOR(S) Mueller, Kent A., Major, USAF 13a. TYPE OF...identify by block number) Scheduled inspections, specifically the C-141 Isochronal Major, consume a significant amount of time as currently managed

  3. Quarterly report on program cost and schedule; First quarter FY 1991

    SciTech Connect

    1991-04-01

    This report is intended to provide a summary of the cost and schedule performance for the Civilian Radioactive Waste Management Program. Historical and current cost profiles (extracted from the DOE Financial Information System) are presented for each of the major program elements. Also included in this report are the reference program schedule, the status of near-term program milestones and the status of the Nuclear Waste Fund revenues and disbursements. This report includes data through December 1990.

  4. Classification of two steroids, prostanozol and methasterone, as Schedule III anabolic steroids under the Controlled Substance Act. Final rule.

    PubMed

    2012-07-30

    With the issuance of this Final Rule, the Administrator of the DEA classifies the following two steroids as "anabolic steroids'' under the Controlled Substances Act (CSA): prostanozol (17[beta]-hydroxy-5[alpha]-androstano[3,2-c]pyrazole) and methasterone (2[alpha],17[alpha]-dimethyl-5[alpha]-androstan-17[beta]-ol-3-one). These steroids and their salts, esters, and ethers are Schedule III controlled substances subject to the regulatory control provisions of the CSA.

  5. DOTSYS III: A Portable Program for Braille Translation. Rev. 1.

    ERIC Educational Resources Information Center

    Sullivan, Joseph E., Ed.; And Others

    DOTSYS III is a COBOL program for the translation of English text into standard English braille, also known as grade 2 braille. Text in foreign languages or English may be transliterated as grade 1 braille or "computer" braille. The program's method of operation together with instructions on using the program, modifying or extending the…

  6. Earned Schedule 10 Years Later Analyzing Military Programs

    DTIC Science & Technology

    2014-04-01

    This does not necessarily suggest that ES is inapplicable to the CPM in the DoD. Rather, it points to the necessity of making contractor EVMS reporting...ES against CPM , we stop short of recommending ES as its replacement. However, our analysis indicates ES warrants more intensive use for schedule...complementary tool (i.e. the primary cross-check) to the CPM method that is predominately utilized. Traditional EVM schedule analysis techniques should not be

  7. 75 FR 67054 - Listing of Approved Drug Products Containing Dronabinol in Schedule III

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-01

    ... Health and Human Services (DHHS) with requests for scientific and medical evaluation and scheduling... for Health, DHHS, sent the Deputy Administrator of DEA scientific and medical evaluations and letters... (marijuana). THC, as a general category, is listed in schedule I of the CSA,\\1\\ while ] dronabinol...

  8. Effects of 14-day treatment with the schedule III anorectic phendimetrazine on choice between cocaine and food in rhesus monkeys.

    PubMed

    Banks, Matthew L; Blough, Bruce E; Negus, S Stevens

    2013-08-01

    The clinical utility of monoamine releasers such as phenmetrazine or d-amphetamine as candidate agonist medications for cocaine dependence is hindered by their high abuse liability. Phendimetrazine is a clinically available schedule III anorectic that functions as a prodrug for phenmetrazine and thus may have lower abuse liability. This study determined the effects of continuous 14-day treatment with phendimetrazine on cocaine vs. food choice in rhesus monkeys (N=4). Responding was maintained under a concurrent schedule of food delivery (1-g pellets, fixed-ratio 100 schedule) and cocaine injections (0-0.1mg/kg/injection, fixed-ratio 10 schedule). Cocaine choice dose-effect curves were determined daily before and during 14-day periods of continuous intravenous treatment with saline or (+)-phendimetrazine (0.32-1.0mg/kg/h). Effects of 14-day treatment with (+)-phenmetrazine (0.1-0.32 mg/kg/h; N=5) and d-amphetamine (0.032-0.1mg/kg/h; N=6) were also examined for comparison. During saline treatment, food was primarily chosen during availability of low cocaine doses (0, 0.0032, and 0.01 mg/kg/injection), and cocaine was primarily chosen during availability of higher cocaine doses (0.032 and 0.1mg/kg/injection). Phendimetrazine initially decreased overall responding without significantly altering cocaine choice. Over the course of 14 days, tolerance developed to rate decreasing effects, and phendimetrazine dose-dependently decreased cocaine choice (significant at 0.032 mg/kg/injection cocaine). Phenmetrazine and d-amphetamine produced qualitatively similar effects. These results demonstrate that phendimetrazine can produce significant, though modest, reductions in cocaine choice in rhesus monkeys. Phendimetrazine may be especially suitable as a candidate medication for human studies because of its schedule III clinical availability. Copyright © 2013 Elsevier Ireland Ltd. All rights reserved.

  9. 15 CFR Schedule I to Part 700 - Approved Programs and Delegate Agencies

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 2 2012-01-01 2012-01-01 false Approved Programs and Delegate Agencies I Schedule I to Part 700 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign... BASE REGULATIONS DEFENSE PRIORITIES AND ALLOCATIONS SYSTEM Pt. 700, Sched. I Schedule I to Part...

  10. 15 CFR Schedule I to Part 700 - Approved Programs and Delegate Agencies

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 2 2013-01-01 2013-01-01 false Approved Programs and Delegate Agencies I Schedule I to Part 700 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign... BASE REGULATIONS DEFENSE PRIORITIES AND ALLOCATIONS SYSTEM Pt. 700, Sched. I Schedule I to Part...

  11. An Integrated Constraint Programming Approach to Scheduling Sports Leagues with Divisional and Round-robin Tournaments

    SciTech Connect

    Carlsson, Mats; Johansson, Mikael; Larson, Jeffrey

    2014-01-01

    Previous approaches for scheduling a league with round-robin and divisional tournaments involved decomposing the problem into easier subproblems. This approach, used to schedule the top Swedish handball league Elitserien, reduces the problem complexity but can result in suboptimal schedules. This paper presents an integrated constraint programming model that allows to perform the scheduling in a single step. Particular attention is given to identifying implied and symmetry-breaking constraints that reduce the computational complexity significantly. The experimental evaluation of the integrated approach takes considerably less computational effort than the previous approach.

  12. Community College Exemplary Instructional Programs, Volume III.

    ERIC Educational Resources Information Center

    Fideler, Elizabeth F., Ed.; Bazer, Gerald, Ed.

    Third in an annual series, this volume presents brief descriptions of a number of outstanding community college instructional programs identified by the National Council of Instructional Administrators (NCIA). Each description includes the address and telephone number of the college in which the program operates, and the names of the college…

  13. Human Development Program: Level III Activity Guide.

    ERIC Educational Resources Information Center

    Bessell, Harold

    The curriculum guide presents the activities component of the Human Development Program for the third grade. The Human Development Program (HDP) is an affective curricular approach developed by psychologists to help teachers instill responsibility and self-confidence in children. Following a brief overview of the HDP and explanation of the Magic…

  14. Content Analysis Schedule for Bilingual Education Programs: Catch-Up.

    ERIC Educational Resources Information Center

    Ehrlich, Roselin S.; Shore, Marietta Saravia

    This content analysis schedule for Project Catch-Up in Zapata, Texas, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the linguistic background of project…

  15. Content Analysis Schedule for Bilingual Education Programs: Proyecto PAL.

    ERIC Educational Resources Information Center

    Gonzalez, Castor

    This content analysis schedule for "Proyecto PAL" in San Jose, California, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the linguistic…

  16. Master schedule for CY-1984 Hanford environmental surveillance routine sampling program

    SciTech Connect

    Blumer, P.J.; Price, K.R.; Eddy, P.A.; Carlile, J.M.V.

    1983-12-01

    This report provides the current schedule of data collection for the routine Hanford environmental surveillance and ground-water Monitoring Programs at the Hanford Site. The purpose is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs. The routine sampling schedule provided herein does not include samples that are planned to be collected during FY-1984 in support of special studies, special contractor support programs, or for quality control purposes.

  17. 15 CFR Schedule I to Part 700 - Approved Programs and Delegate Agencies

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... International defense programs: Canada: D1 Canadian military programs Department of Commerce. D2 Canadian... 15 Commerce and Foreign Trade 2 2010-01-01 2010-01-01 false Approved Programs and Delegate Agencies I Schedule I to Part 700 Commerce and Foreign Trade Regulations Relating to Commerce and...

  18. 15 CFR Schedule I to Part 700 - Approved Programs and Delegate Agencies

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... International defense programs: Canada: D1 Canadian military programs Department of Commerce. D2 Canadian... 15 Commerce and Foreign Trade 2 2011-01-01 2011-01-01 false Approved Programs and Delegate Agencies I Schedule I to Part 700 Commerce and Foreign Trade Regulations Relating to Commerce and...

  19. Interdisciplinary Studies Program. Teacher's Guide: Part III.

    ERIC Educational Resources Information Center

    Valencia Community Coll., Orlando, FL.

    This teacher's guide was developed for the third of four courses in Valencia Community College's Interdisciplinary Studies program, a 2-year core general education curriculum which chronologically examines the major developments in the evolution of human knowledge. The guide provides an introductory overview of the course's topic (i.e., Western…

  20. Compile-Time Schedulability Analysis of Communicating Concurrent Programs

    DTIC Science & Technology

    2006-06-28

    are Ptolemy [1], Metropolis [8], and YAPI [20]. YAPI is developed at Philips research labs as an implementation of Kahn process network based on...the applicability of quasi-static scheduling for practical applications. 88 Bibliography [1] The ptolemy project. URL: http://ptolemy.eecs.berkeley.edu... Ptolemy : A framework for simulating and prototyping heterogenous systems. Int. Journal in Computer Simulation, 4(2):0–, 1994. [13] Y. Chen, W. T. Tsai, and

  1. Reliability of DSM-III-R anxiety disorder categories. Using the Anxiety Disorders Interview Schedule-Revised (ADIS-R).

    PubMed

    Di Nardo, P; Moras, K; Barlow, D H; Rapee, R M; Brown, T A

    1993-04-01

    A large reliability study of DSM-III-R anxiety disorders is reported in which outpatients (n = 267) received two independent structured interviews (Anxiety Disorders Interview Schedule-Revised). It is the only reliability study to date in which the final DSM-III-R criteria are used throughout the study. Reliability was assessed for each diagnosis when it was assigned as a principal diagnosis and when it was assigned as either a principal or an additional diagnosis. Excellent reliability was obtained for current principal diagnoses of simple phobia, social phobia, and obsessive-compulsive disorder. Agreement was good for panic disorder when all severity levels of agoraphobic avoidance were combined. Reliability was fair for generalized anxiety disorder. Remaining diagnostic difficulties, particularly in identifying levels of agoraphobic avoidance and in reliably diagnosing generalized anxiety disorder, are discussed in the context of changes in diagnostic criteria that are under consideration for DSM-IV.

  2. Environmental Technology Verification (ETV) Program Case Studies: Demonstrating Program Outcomes, Volume III

    EPA Science Inventory

    This booklet, ETV Program Case Studies: Demonstrating Program Outcomes, Volume III contains two case studies, addressing verified environmental technologies for decentalized wastewater treatment and converting animal waste to energy. Each case study contains a brief description ...

  3. Environmental Technology Verification (ETV) Program Case Studies: Demonstrating Program Outcomes, Volume III

    EPA Science Inventory

    This booklet, ETV Program Case Studies: Demonstrating Program Outcomes, Volume III contains two case studies, addressing verified environmental technologies for decentalized wastewater treatment and converting animal waste to energy. Each case study contains a brief description ...

  4. FFTF and Advanced Reactors Transition Program Resource Loaded Schedule

    SciTech Connect

    GANTT, D.A.

    2000-10-31

    This Resource Load Schedule (RLS) addresses two missions. The Advanced Reactors Transition (ART) mission, funded by DOE-EM, is to transition assigned, surplus facilities to a safe and compliant, low-cost, stable, deactivated condition (requiring minimal surveillance and maintenance) pending eventual reuse or D&D. Facilities to be transitioned include the 309 Building Plutonium Recycle Test Reactor (PRTR) and Nuclear Energy Legacy facilities. This mission is funded through the Environmental Management (EM) Project Baseline Summary (PBS) RL-TP11, ''Advanced Reactors Transition.'' The second mission, the Fast Flux Test Facility (FFTF) Project, is funded through budget requests submitted to the Office of Nuclear Energy, Science and Technology (DOE-NE). The FFTF Project mission is maintaining the FFTF, the Fuels and Materials Examination Facility (FMEF), and affiliated 400 Area buildings in a safe and compliant standby condition. This mission is to preserve the condition of the plant hardware, software, and personnel in a manner not to preclude a plant restart. This revision of the Resource Loaded Schedule (RLS) is based upon the technical scope in the latest revision of the following project and management plans: Fast Flux Test Facility Standby Plan (Reference 1); Hanford Site Sodium Management Plan (Reference 2); and 309 Building Transition Plan (Reference 4). The technical scope, cost, and schedule baseline is also in agreement with the concurrent revision to the ART Fiscal Year (FY) 2001 Multi-Year Work Plan (MYWP), which is available in an electronic version (only) on the Hanford Local Area Network, within the ''Hanford Data Integrator (HANDI)'' application.

  5. Schedule Management Competencies for Department of Defense Program Managers.

    DTIC Science & Technology

    1995-09-01

    professionalism of their procurement workforce. Models identifying the competencies required of DoD program managers could provide valuable information for ...considered "valuable" to practicing program managers. A complete list of the medians and percentages can be found in Appendix E . Research Question 2... method for providing the standard skills necessary to manage programs. Education and training programs are therefore essential to ensure professionals

  6. Cyclical scheduling for welfare assistants using 0-1 goal programming

    NASA Astrophysics Data System (ADS)

    Rashid, Nur Rasyida Mohd; Ismail, Wan Rosmanira; Ismail, Norul Fadhilah; Kapi, Azyan Yusra

    2015-05-01

    Currently, the welfare assistants scheduling are handled manually by the head of the welfare assistants and every record is kept in paper. The head of the welfare assistants has to go through a very tedious process to complete the schedule every months in order to conform to the organizations policy as well as to satisfy the welfare assistants' preferences. However, the scheduling task is very time consuming and the staff preferences are not fully satisfied. This paper presents a 0-1 goal programming approach to build a cyclical scheduling for every 60 days and is adapted to welfare assistant schedule in an orphanage institution. This systematic model is built to improve the current manual method of scheduling. The model is implemented using LINGO software. The result shows that each staff has an equal percentage of 62%, 38% and 32% for total duty, night shift and day off respectively. Thus, the proposed model offered better result by providing a cyclical schedule that is better and give higher satisfaction and fairness to the staff than the current manually developed schedule.

  7. Idaho National Engineering Laboratory Environmental Restoration Program Schedule Contingency Evaluation Report

    SciTech Connect

    Not Available

    1993-09-01

    This report represents the schedule contingency evaluation done on the FY-93 Major System Acquisition (MSA) Baseline for the Idaho National Engineering Laboratory`s (INEL) Environmental Restoration Program (EPP). A Schedule Contingency Evaluation Team (SCET) was established to evaluate schedule contingency on the MSA Baseline for the INEL ERP associated with completing work within milestones established in the baseline. Baseline schedules had been established considering enforceable deadlines contained in the Federal Facilities Agreement/Consent Order (FFA/CO), the agreement signed in 1992, by the State of Idaho, Department of Health & Welfare, the U.S. Environmental Protection Agency, Region 10, and the U.S. Department of Energy, Idaho Operations Office. The evaluation was based upon the application of standard schedule risk management techniques to the specific problems of the INEL ERP. The schedule contingency evaluation was designed to provided early visibility for potential schedule delays impacting enforceable deadlines. The focus of the analysis was on the duration of time needed to accomplish all required activities to achieve completion of the milestones in the baseline corresponding to the enforceable deadlines. Additionally, the analysis was designed to identify control of high-probability, high-impact schedule risk factors.

  8. High Voltage, Low Inductance Hydrogen Thyratron Study Program, Phase III.

    DTIC Science & Technology

    1981-12-01

    results and supporting information that bear on the progress of the Program as a whole. The Government’s Contract Monitor for Phase III was Mr. William ...ST ATTN: DRDEL-LL; -SB; -AP (IN TURN) I DRSEL-MA-MP 2800 Powder Mill Road 2 DRSEL-PA Adelphi, MD 20783 001 CINDAS 001 Cdr, ERADCOM Purdue Industrial

  9. A model for estimating the cost impact of schedule perturbations on aerospace research and development programs

    NASA Technical Reports Server (NTRS)

    Bishop, D. F.

    1972-01-01

    The problem of determining the cost impact attributable to perturbations in an aerospace R and D program schedule is discussed in terms of the diminishing availability of funds. The methodology from which a model is presented for updating R and D cost estimates as a function of perturbations in program time is presented.

  10. A Modular Schedule (Telstar Regional High School's Humanities-Oriented English Program).

    ERIC Educational Resources Information Center

    Russell, Frances M., Ed.

    To better match available time and facilities to the form and content of subject matter, a humanities-oriented English program was coordinated with programs in other content areas and a modular schedule will be set up. Each class day will consist of 24 fifteen-minute modules, and some meeting times will be a multiple of these 15-minute periods. To…

  11. An alternate property tax program requiring a forest management plan and scheduled harvesting

    Treesearch

    D.F. Dennis; P.E. Sendak

    1991-01-01

    Vermont's Use Value Appraisal property tax program, designed to address problems such as tax inequity and forced development caused by taxing agricultural and forest land based on speculative values, requires a forest management plan and scheduled harvests. A probit analysis of enrollment provides evidence of the program's success in attracting large parcels...

  12. Scheduling language and algorithm development study. Volume 2, phase 2: Introduction to plans programming. [user guide

    NASA Technical Reports Server (NTRS)

    Cochran, D. R.; Ishikawa, M. K.; Paulson, R. E.; Ramsey, H. R.

    1975-01-01

    A user guide for the Programming Language for Allocation and Network Scheduling (PLANS) is presented. Information is included for the construction of PLANS programs. The basic philosophy of PLANS is discussed, and access and update reference techniques are described along with the use of tree structures.

  13. Assessing Weapon System Acquisition Cycle Times: Setting Program Schedules

    DTIC Science & Technology

    2015-06-01

    insights for the CIRCM program. This program is developing a lightweight laser countermeasure system for smaller helicopters. The device will use a laser ...beam to confuse infrared (IR)-guided missile seekers. The existing protection for such helicopters is the Common Missile Warning System (CMWS...Missile Warning System CDD Capabilities Development Document CIRCM Common Infrared Countermeasures CM Cruise Missile CPD Capabilities Production

  14. Schedules of controlled substances: rescheduling of the Food and Drug Administration approved product containing synthetic dronabinol [(-) - [DELTA] less than 9 greater than - (trans)-tetrahydrocannabinol] in sesame oil and encapsulated in soft gelatin capsules from schedule II to schedule III. Department of Justice (DOJ), Drug Enforcement Administration (DEA). Final rule.

    PubMed

    1999-07-02

    This is a final rule of the Deputy Administrator of the Drug Enforcement Administration (DEA) transferring a drug between schedules of the Controlled Substances Act (CSA) pursuant to 21 U.S.C. 811. With the issuance of this final rule, the Deputy Administrator transfers from schedule II to schedule III of the CSA the drug containing synthetic dronabinol [(-) - [DELTA] less than 9 greater than - (trans)-tetrahydrocannabinol] in sesame oil and encapsulated in soft gelatin capsules in a product approved by the Food and Drug Administration (FDA). This rule also designates this drug as a schedule III non-narcotic substance requiring an import/export permit. As a result of this rule, the regulatory controls and criminal sanctions of schedule III will be applicable to the manufacture, distribution, importation and exportation of this drug.

  15. Stratospheric Aerosol and Gas Experiment, SAGE III on ISS, An Earth Science Mission on the International Space Station, Schedule Risk Analysis, A Project Perspective

    NASA Technical Reports Server (NTRS)

    Bonine, Lauren

    2015-01-01

    The presentation provides insight into the schedule risk analysis process used by the Stratospheric Aerosol and Gas Experiment III on the International Space Station Project. The presentation focuses on the schedule risk analysis process highlighting the methods for identification of risk inputs, the inclusion of generic risks identified outside the traditional continuous risk management process, and the development of tailored analysis products used to improve risk informed decision making.

  16. A vehicle scheduling algorithm using non-serial discrete dynamic programming with space shuttle applications

    NASA Technical Reports Server (NTRS)

    Dupnick, E.

    1973-01-01

    Description of the development and operation of a vehicle-scheduling algorithm which has applications to the NASA problem of assigning payloads to space delivery vehicles. The algorithm is based on a discrete, integer-valued, nonserial, dynamic-programming solution to the classical problem of developing resource utilization plans with limited resources. The algorithm places special emphasis on incorporating interpayload (precedence) relationships; maintaining optimal alternate schedule definitions (a unique feature of dynamic programming) in the event of contingencies (namely, resource inventory changes) without problem resolution; and, by using a special information storage technique, reducing the computational complexity of solving realistic problems.

  17. Programmed schedule holds for improving launch vehicle holds

    NASA Technical Reports Server (NTRS)

    Gralow, F. H.; Hayes, J. D.; Streiff, M. A.; Temple, A. G.; Venditti, R. A.

    1969-01-01

    Baseline definition and system optimization are used for the analysis of programmed holds developed through prelaunch system analysis. Identification of design specifications for ground support equipment and maintenance concepts, and design specifications are used to describe the functional utilization of the overall flow process.

  18. The nurse scheduling problem: a goal programming and nonlinear optimization approaches

    NASA Astrophysics Data System (ADS)

    Hakim, L.; Bakhtiar, T.; Jaharuddin

    2017-01-01

    Nurses scheduling is an activity of allocating nurses to conduct a set of tasks at certain room at a hospital or health centre within a certain period. One of obstacles in the nurse scheduling is the lack of resources in order to fulfil the needs of the hospital. Nurse scheduling which is undertaken manually will be at risk of not fulfilling some nursing rules set by the hospital. Therefore, this study aimed to perform scheduling models that satisfy all the specific rules set by the management of Bogor State Hospital. We have developed three models to overcome the scheduling needs. Model 1 is designed to schedule nurses who are solely assigned to a certain inpatient unit and Model 2 is constructed to manage nurses who are assigned to an inpatient room as well as at Polyclinic room as conjunct nurses. As the assignment of nurses on each shift is uneven, then we propose Model 3 to minimize the variance of the workload in order to achieve equitable assignment on every shift. The first two models are formulated in goal programming framework, while the last model is in nonlinear optimization form.

  19. Automatic programming via iterated local search for dynamic job shop scheduling.

    PubMed

    Nguyen, Su; Zhang, Mengjie; Johnston, Mark; Tan, Kay Chen

    2015-01-01

    Dispatching rules have been commonly used in practice for making sequencing and scheduling decisions. Due to specific characteristics of each manufacturing system, there is no universal dispatching rule that can dominate in all situations. Therefore, it is important to design specialized dispatching rules to enhance the scheduling performance for each manufacturing environment. Evolutionary computation approaches such as tree-based genetic programming (TGP) and gene expression programming (GEP) have been proposed to facilitate the design task through automatic design of dispatching rules. However, these methods are still limited by their high computational cost and low exploitation ability. To overcome this problem, we develop a new approach to automatic programming via iterated local search (APRILS) for dynamic job shop scheduling. The key idea of APRILS is to perform multiple local searches started with programs modified from the best obtained programs so far. The experiments show that APRILS outperforms TGP and GEP in most simulation scenarios in terms of effectiveness and efficiency. The analysis also shows that programs generated by APRILS are more compact than those obtained by genetic programming. An investigation of the behavior of APRILS suggests that the good performance of APRILS comes from the balance between exploration and exploitation in its search mechanism.

  20. Block Scheduling and the End of Course Examination Program (ECOEP): A South Carolina Study

    ERIC Educational Resources Information Center

    Howard, Nanci Elizabeth

    2010-01-01

    This causal-comparative study investigates the differences in the End of Course Examination Program (EOCEP) test scores of ninth grade students in English I and Algebra I/Math for the technologies, as influenced by schedules used in South Carolina public high schools during the 2005-2006 academic year. Framing this study is the previous…

  1. Creation of the selection list for the Experiment Scheduling Program (ESP)

    NASA Technical Reports Server (NTRS)

    Deuermeyer, B. L.; Shannon, R. E.; Underbrink, A. J., Jr.

    1986-01-01

    The efforts to develop a procedure to construct selection groups to augment the Experiment Scheduling Program (ESP) are summarized. Included is a User's Guide and a sample scenario to guide in the use of the software system that implements the developed procedures.

  2. 76 FR 1366 - Medicare Program; Amendment to Payment Policies Under the Physician Fee Schedule and Other...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-10

    ... HUMAN SERVICES Centers for Medicare & Medicaid Services 42 CFR Part 410 RIN 0938-AP79 Medicare Program; Amendment to Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B for CY 2011 AGENCY: Centers for Medicare & Medicaid Services (CMS), HHS. ACTION: Final rule. SUMMARY: This...

  3. A Proposed Program for Scheduling, Project Management, Control and Instruction. GEM Bulletin 69-17.

    ERIC Educational Resources Information Center

    Reed, Charles P.

    A computer-oriented filing system is considered necessary to handle the approximately 1,500 students likely to be enrolled in the Georgia model program to train elementary teachers (ED 025 491) by the time it reaches sustained operation. The system of individualized scheduling involves establishing and maintaining a computer storage filing system…

  4. Impact of a Student-Scheduled Child Care Program on Parents' Educational Goals

    ERIC Educational Resources Information Center

    Carter, Barbara

    2016-01-01

    The purpose of this study is to examine what, if any, impact a Student-scheduled Child Care (SSCC) program had on the families of students completing their higher education goals at a college in the southwestern region of the United States. Student completion rate is a concern for most college and university administrators. Research conducted by…

  5. Block Scheduling and the End of Course Examination Program (ECOEP): A South Carolina Study

    ERIC Educational Resources Information Center

    Howard, Nanci Elizabeth

    2010-01-01

    This causal-comparative study investigates the differences in the End of Course Examination Program (EOCEP) test scores of ninth grade students in English I and Algebra I/Math for the technologies, as influenced by schedules used in South Carolina public high schools during the 2005-2006 academic year. Framing this study is the previous…

  6. Content Analysis Schedule for Bilingual Education Programs: Bilingual Instruction for Spanish Speaking Pupils.

    ERIC Educational Resources Information Center

    Glick, Toby; Gonzalez, Castor

    This content analysis schedule for the bilingual program of the Marysville (California) Joint Unified School District presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff…

  7. 77 FR 58996 - Multiple Award Schedule (MAS) Program Continuous Open Season-Operational Change; Extension of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-25

    ... ADMINISTRATION Multiple Award Schedule (MAS) Program Continuous Open Season-- Operational Change; Extension of Comment Period AGENCY: Federal Acquisition Service (FAS), General Services Administration (GSA). ACTION... Administration (GSA), Federal Acquisition Service (FAS) issued a notice on July 23, 2012. The comment period is...

  8. Quarterly report on program cost and schedule, third quarter FY 1990

    SciTech Connect

    1990-10-01

    This report is intended to provide a summary of the cost and schedule performance for the Civilian Radioactive Waste Management Program. Historical and current cost profiles (extracted from final Financial Information System (FIS) reports) are presented for each of the major program elements. Also included in this report is the status of the Nuclear Waste Fund revenues and disbursements. This report includes data through June 1990. 1 fig.

  9. Emergency Nurses' Perceptions of Discharge Processes for Patients Receiving Schedule II and III Medications for Pain Management in the Emergency Department.

    PubMed

    Wolf, Lisa A; Delao, Altair M; Perhats, Cydne

    2015-05-01

    There is a lack of evidence-based criteria for the discharge of patients receiving Schedule II and III narcotic medications in the emergency department. The purpose of this study was to understand nurses' perceptions about common practices in the discharge of patients receiving Schedule II and III narcotics in the emergency department in terms of dosage, time, availability of care resources at home, and other discharge criteria. A qualitative exploratory design was used. A sample of emergency nurses was recruited from the preregistered attendees of a national conference. Two focus group sessions were held, and audiotaped in their entirety. The audiotapes were transcribed and analyzed for emerging themes by the research team. Identified themes were Time, Physiologic Considerations, Cognitive Considerations, Safety Considerations, Policies, Evidence, Ethical/Legal Concerns, and Nursing Impact. Participants reported drug-to-discharge times of 0 minutes ("gulp and go") to 240 minutes after administration of Schedule II and III narcotics specifically, and "any medication" generally. The most common reason given for a wait of any kind was to assess patients for a reaction. It is the perception of our respondents that determination of readiness for discharge after a patient has received Schedule II or III narcotics in the emergency department is largely left up to nursing staff. Participants suggest that development of policies and checklists to assist in decision making related to discharge readiness would be useful for both nurses and patients. Copyright © 2015 Emergency Nurses Association. Published by Elsevier Inc. All rights reserved.

  10. 10 CFR Appendix D to Part 73 - Physical Protection of Irradiated Reactor Fuel in Transit, Training Program Subject Schedule

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Physical Protection of Irradiated Reactor Fuel in Transit, Training Program Subject Schedule D Appendix D to Part 73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED... Irradiated Reactor Fuel in Transit, Training Program Subject Schedule Pursuant to the provision of § 73.37...

  11. 10 CFR Appendix D to Part 73 - Physical Protection of Irradiated Reactor Fuel in Transit, Training Program Subject Schedule

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Physical Protection of Irradiated Reactor Fuel in Transit, Training Program Subject Schedule D Appendix D to Part 73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED... Irradiated Reactor Fuel in Transit, Training Program Subject Schedule Pursuant to the provision of § 73.37...

  12. A primary shift rotation nurse scheduling using zero-one linear goal programming.

    PubMed

    Huarng, F

    1999-01-01

    In this study, the author discusses the effect of nurse shift schedules on circadian rhythm and some important ergonomics criteria. The author also reviews and compares different nurse shift scheduling methods via the criteria of flexibility, fairness, continuity in shift assignments, nurses' preferences, and ergonomics principles. In this article, a primary shift rotation system is proposed to provide better continuity in shift assignments to satisfy nurses' preferences. The primary shift rotation system is modeled as a zero-one linear goal programming (LGP) problem. To generate the shift assignment for a unit with 13 nurses, the zero-one LGP model takes less than 3 minutes on average, whereas the head nurses spend approximately 2 to 3 hours on shift scheduling. This study reports the process of implementing the primary shift rotation system.

  13. Master schedule for CY-1983 Hanford environmental surveillance routine sampling program

    SciTech Connect

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.; Dirkes, R.L.

    1982-12-01

    The current schedule of data collection for the routine Hanford environmental surveillance and ground-water monitoring programs at the Hanford Site is presented. The purpose of the programs is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs. Radiological monitoring data are reported for air (particulate filter and gases/vapor), Columbia River water, sanitary water, onsite pond water, foodstuffs (whole milk, leafy vegetables, fruit, wheat/alfalfa, beef, poultry/eggs), wildlife, soil and vegetation, and direct radiation. Information is also given for on site radiation control audit surveys (roadway, railway, aerial, and waste disposal sites, and the Hanford ground-water monitoring program.

  14. Does the benefits schedule of cash assistance programs affect the purchase of temptation goods?

    PubMed Central

    White, Justin S.; Basu, Sanjay

    2016-01-01

    A critique of cash assistance programs is that beneficiaries may spend the money on “temptation goods” such as alcohol and tobacco. We exploit a change in the payment schedule of Peru’s conditional cash transfer program to identify the impact of benefit receipt frequency on the purchase of temptation goods. We use annual household data among cross-sectional and panel samples to analyze the effect of the policy change on the share of the household budget devoted to four categories of temptation goods. Using a difference-in-differences estimation approach, we find that larger, less frequent payments increased the expenditure share of alcohol by 55–80% and sweets by 10–40%, although the absolute magnitudes of these effects are small. Our study suggests that less frequent benefits scheduling may lead cash recipients to make certain types of temptation purchases. PMID:26874596

  15. Development of Milestone Schedules for Selected Logistics Support Directorate Programs. Appendix A. Part 1. HTPM Templates.

    DTIC Science & Technology

    1987-09-15

    mnay b* used untrI1 exhausted SEC’IPITY CLASSIFICATION OF THIS PAGE Ar r, 1 .%r VV I r~.,. -’ LILE 0 7.- w I 00 DEVELOPMENT OF MILESTONE SCHEDULES FOR...their names begin with an asterisk, "*" For example, "* CEAP " would be a subprogram of the CE main program. However, if the . "subprogram name is eight

  16. 78 FR 41785 - Agency Information Collection Activities; Comment Request; Implementation of Title I/II Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-11

    ... Agency Information Collection Activities; Comment Request; Implementation of Title I/II Program... notice will be considered public records. Title of Collection: Implementation of Title I/II Program... Estimated Number of Annual Burden Hours: 6,573. Abstract: The Implementation of Title I/II...

  17. Chemotherapy appointment scheduling under uncertainty using mean-risk stochastic integer programming.

    PubMed

    Alvarado, Michelle; Ntaimo, Lewis

    2016-09-16

    Oncology clinics are often burdened with scheduling large volumes of cancer patients for chemotherapy treatments under limited resources such as the number of nurses and chairs. These cancer patients require a series of appointments over several weeks or months and the timing of these appointments is critical to the treatment's effectiveness. Additionally, the appointment duration, the acuity levels of each appointment, and the availability of clinic nurses are uncertain. The timing constraints, stochastic parameters, rising treatment costs, and increased demand of outpatient oncology clinic services motivate the need for efficient appointment schedules and clinic operations. In this paper, we develop three mean-risk stochastic integer programming (SIP) models, referred to as SIP-CHEMO, for the problem of scheduling individual chemotherapy patient appointments and resources. These mean-risk models are presented and an algorithm is devised to improve computational speed. Computational results were conducted using a simulation model and results indicate that the risk-averse SIP-CHEMO model with the expected excess mean-risk measure can decrease patient waiting times and nurse overtime when compared to deterministic scheduling algorithms by 42 % and 27 %, respectively.

  18. Fair Energy Scheduling for Vehicle-to-Grid Networks Using Adaptive Dynamic Programming.

    PubMed

    Xie, Shengli; Zhong, Weifeng; Xie, Kan; Yu, Rong; Zhang, Yan

    2016-08-01

    Research on the smart grid is being given enormous supports worldwide due to its great significance in solving environmental and energy crises. Electric vehicles (EVs), which are powered by clean energy, are adopted increasingly year by year. It is predictable that the huge charge load caused by high EV penetration will have a considerable impact on the reliability of the smart grid. Therefore, fair energy scheduling for EV charge and discharge is proposed in this paper. By using the vehicle-to-grid technology, the scheduler controls the electricity loads of EVs considering fairness in the residential distribution network. We propose contribution-based fairness, in which EVs with high contributions have high priorities to obtain charge energy. The contribution value is defined by both the charge/discharge energy and the timing of the action. EVs can achieve higher contribution values when discharging during the load peak hours. However, charging during this time will decrease the contribution values seriously. We formulate the fair energy scheduling problem as an infinite-horizon Markov decision process. The methodology of adaptive dynamic programming is employed to maximize the long-term fairness by processing online network training. The numerical results illustrate that the proposed EV energy scheduling is able to mitigate and flatten the peak load in the distribution network. Furthermore, contribution-based fairness achieves a fast recovery of EV batteries that have deeply discharged and guarantee fairness in the full charge time of all EVs.

  19. 2012 Gordon Research Conference on Microbial Stress Response, Schedule and Speaker/Poster Program

    SciTech Connect

    Donohue, Timothy J.

    2012-07-20

    The Gordon Research Conference on Microbial Stress Response was held at Mount Holyoke College, South Hadley, Massachusetts, July 15-20, 2012. The Conference was well-attended with 180 participants. The 2012 Microbial Stress Responses Gordon Research Conference will provide a forum for the open reporting of recent discoveries on the diverse mechanisms employed by microbes to respond to stress. Approaches range from analysis at the molecular level (how are signals perceived and transmitted to change gene expression or function) to cellular and microbial community responses. Attached is a copy of the formal schedule and speaker program and the poster program.

  20. Impact of two scheduling systems on early enrollment in a group prenatal care program.

    PubMed

    Hackley, Barbara; Applebaum, Jo; Wilcox, Wendy C; Arevalo, Sandra

    2009-01-01

    Group care is an effective approach to prenatal care. Yet difficulties in recruiting, enrolling, and scheduling women into group care present obstacles to optimal program delivery. The purpose of this study was to determine whether the use of a scheduling system based on women's estimated date of delivery (EDD) decreased gestational age at entry to group care, increased attendance, and improved continuity of care. A total of 13 groups were held; seven groups used a scheduling system based on appointment availability and six groups used a scheduling system based on women's EDD. Compared with the availability-based scheduling system, the EDD-based system decreased mean gestational age (23.2 vs. 21.8 weeks; P = .058) and significantly decreased mean maximum gestational age (31.0 vs. 26.3 weeks; P = .002) at entry to group care. The EDD-based system increased the mean number of sessions offered per group (6.7 vs. 8.2 sessions; P < .001); however, attendance rates were similar across systems. The EDD-based system also increased the percentage of women who had the same initial visit and group provider (78.0% vs. 85.5%; P = .303). The use of this system by other health care facilities could ease the task of enrolling a sufficient number of participants into group care, minimize the need for women to change care providers if they desire group care, and allow more time for educational activities and the development of social networks for women by offering more sessions per group.

  1. A Comparison of Earned Value Management and Earned Schedule as Schedule Predictors on DoD ACAT I Programs

    DTIC Science & Technology

    2013-03-01

    introduced in its current form to the agencies of the U.S. government in 1967 as the Cost/Schedule Control Systems Criteria (C/SCSC). EVM has been...It is most effective for a project with “interdependent activities” and is “commonly used with all forms of projects, including construction...used ES in some capacity: some used it as a primary form of schedule analysis, while others used it primarily as an “indicator.” ESC analysts who

  2. The JUPITER-III Program: ANL analysis of ZPPR-17

    SciTech Connect

    Brumbach, S.B.; Collins, P.J.; Grasseschi, G.L.; Schaefer, R.W.; Brumbach, S.B.; Collins, P.J.; Grasseschi, G.L.; Schaefer, R.W.

    1989-01-31

    The ZPPR-17 assembly was part of the JUPITER-III cooperative program between the US DOE and PNC of Japan. The assembly was designed to study the neutronic behavior of a large, axially heterogeneous, liquid-metal-cooled reactor. The unique feature of the assembly was an internal blanket region in the axial center of the core extending two-thirds of the core radius. Assembly variants with 25 control rod positions and with 13 half-inserted control rods were built. This report describes in detail the results of measurements and analyses of ZPPR-17. The measurements emphasized reaction rate distributions, and gamma dose measurements were included. Additional measurements were control worth, sodium void worth, and reactivity coefficients associated with small material motions in assembly expansion and bowing.

  3. Schedule Optimization Study, Hanford RI/FS Program. Volume 2, Final report

    SciTech Connect

    Not Available

    1992-12-01

    A Schedule Optimization Study (SOS) of the US Department of Energy (DOE) Hanford Site Remedial Investigation/Feasibility Study (RI/FS) Program was conducted by an independent team of professionals from other federal agencies and the private sector experienced in environmental restoration. This team spent two weeks at Hanford in September 1992 examining the reasons for the lengthy RI/FS process at Hanford and developing recommendations to expedite the process. The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit RI/FS Work Plan. This report documents the study called for in the August 29, 1991, Dispute Resolution Committee Decision Statement. Battelle`s Environmental Management Operations (EMO) coordinated the effort for DOE`s Richland Field Office (RL).

  4. Personnel scheduling using an integer programming model- an application at Avanti Blue-Nile Hotels.

    PubMed

    Kassa, Biniyam Asmare; Tizazu, Anteneh Eshetu

    2013-01-01

    In this paper, we report perhaps a first of its kind application of management science in the Ethiopian hotel industry. Avanti Blue Nile Hotels, a newly established five star hotel in Bahir Dar, is the company for which we developed an integer programming model that determines an optimal weekly shift schedule for the Hotel's engineering department personnel while satisfying several constraints including weekly rest requirements per employee, rest requirements between working shifts per employee, required number of personnel per shift, and other constraints. The model is implemented on an excel solver routine. The model enables the company's personnel department management to develop a fair personnel schedule as needed and to effectively utilize personnel resources while satisfying several technical, legal and economic requirements. These encouraging achievements make us optimistic about the gains other Ethiopian organizations can amass by introducing management science approaches in their management planning and decision making systems.

  5. Modular space station phase B extension program cost and schedules. Volume 1: Cost and schedule estimating process and results

    NASA Technical Reports Server (NTRS)

    Frassinelli, G. J.

    1972-01-01

    Cost estimates and funding schedules are presented for a given configuration and costing ground rules. Cost methodology is described and the cost evolution from a baseline configuration to a selected configuration is given, emphasizing cases in which cost was a design driver. Programmatic cost avoidance techniques are discussed.

  6. [Effectiveness of a perioperative chronic medication reconciliation program in patients scheduled for elective surgery].

    PubMed

    Roure Nuez, Cristina; González Navarro, Manuela; González Valdivieso, Juan; Fuster Barrera, Mireia; Broto Sumalla, Antoni; Sarlé Rubí, Jordi; García Eroles, Xavier

    2012-12-15

    Evaluation of the effectiveness of a perioperative medication reconciliation program in patients scheduled for elective surgery on perioperative medication management protocol adherence. Ambispective cross-cohort study: prospective cohort (Group A), and retrospective control cohort (Group B) without intervention. Forty eight hours before admission a pharmacist generates a proposal on medication active prior to admission to be maintained/discontinued during the perioperative period according to the hospital protocols. The Pharmacy proposal is validated/modified by an anesthesiologist 24h before admission. At the time of admission, after checking with the patient the medication list, the nurse initiates scheduled medication administration pre and postoperatively. The indicator for program effectiveness assessment is the degree of compliance with perioperative medication management protocols at 24, 48 and 72h of admission for intervention and control cohorts. Five hundred and three patients were included. One thousand two hundred and eleven pharmacy medication management recommendations were performed in Group A (intervention), of which 94.9% agreed with protocol. In Group B (control before program implementation) action taken by physicians agreed with protocol only in 32.4% of all cases. The medication reconciliation program significantly increased compliance with the recommendations on chronic medication perioperative management. Copyright © 2012 Elsevier España, S.L. All rights reserved.

  7. The Swift Project Contamination Control Program: A Case Study of Balancing Cost, Schedule and Risk

    NASA Technical Reports Server (NTRS)

    Hansen, Patricia A.; Day, Diane T.; Secunda, Mark S.; Rosecrans, Glenn P.

    2004-01-01

    The Swift Observatory will be launched in early 2004 to examine the dynamic process of gamma ray burst (GRB) events. The multi-wavelength Observatory will study the GRB afterglow characteristics, which will help to answer fundamental questions about both the structure and the evolution of the universe. The Swift Observatory Contamination Control Program has been developed to aid in ensuring the success of the on-orbit performance of two of the primary instruments: the Ultraviolet and Optical Telescope (UVOT) and the X-Ray Telescope (XRT). During the design phase of the Observatory, the contamination control program evolved and trade studies were performed to assess the risk of contaminating the sensitive UVOT and XRT optics during both pre-launch testing and on-orbit operations, within the constraints of the overall program cost and schedule.

  8. The Swift Project Contamination Control Program: A Case study of Balancing Cost, Schedule and Risk

    NASA Technical Reports Server (NTRS)

    Hansen, Patricia A.; Day, Diane; Secunda, Mark

    2003-01-01

    The Swift Observatory will be launched in early 2004 to examine the dynamic process of gamma ray burst (GRB) events. The multi-wavelength Observatory will study the GRB afterglow characteristics, which will help to answer fundamental questions about both the structure and the evolution of the universe. The Swift Observatory Contamination Control Program has been developed to aid in ensuring the success of the on-orbit performance of two of the primary instruments: the Ultraviolet and Optical Telescope (UVOT) and the X-Ray Telescope (XRT). During the design phase of the Observatory, the contamination control program evolved and trade studies were performed to assess the risk of contaminating the sensitive UVOT and XRT optics during both pre-launch testing and on-orbit operations, within the constraints of the overall program cost and schedule.

  9. DSIF station schedules

    NASA Technical Reports Server (NTRS)

    Flarity, L. D.; Hanson, R. J.; Thom, E. H.

    1971-01-01

    System manages Deep Space Instrumentation Facilities /DSIF/ equipment construction and modification planning. Versatile program applies to such tasks as employee time and task schedules, pay schedules, operations schedules, and plant and equipment procurement, construction, modification or service.

  10. Prioritized schedule for review of industrial safety and occupational health programs

    SciTech Connect

    1996-12-01

    This document provides the rationale and criteria for developing a schedule for reviewing the Industrial Safety and Occupational Health programs for the Management and Operating Contractor (MOC) of the Waste Isolation Pilot Plant. The reviews will evaluate the MOC`s compliance with applicable Department of Energy (DOE) orders and regulatory requirements. The scope of this task includes developing prioritization criteria, determining the review priority of each program based upon the criteria, identifying review requirements for each program, and preparing a detailed review schedule. In keeping with the Carlsbad Area Office (CAO) structure for the review of site activities, these review activities will be addressed as surveillances, although the original basis for this requirement refers to these activities as appraisals. Surveillances and appraisals are the same within this document. Surveillances are defined as: ``The act of monitoring or observing to verify whether an item, activity, system, or process conforms to specified requirements. Surveillance of a technical work activity is normally done in real time, i.e., the surveillance is accomplished as the work is being performed.``

  11. Integrating an HTLV-III Screening Program into a Community Based Family Health Service Agency.

    ERIC Educational Resources Information Center

    Klausmeier, Walter W.; Henshaw, Beverly

    Acquired Immune Deficiency Syndrome (AIDS) has become one of the most serious epidemic disease problems in recent years. In 1985 the Public Health Service recommended establishment of test sites where individuals might be tested for Human T Lymphotropic Virus III (HTLV-III) antibody. An HTLV-III antibody screening program was integrated into a…

  12. Integrating an HTLV-III Screening Program into a Community Based Family Health Service Agency.

    ERIC Educational Resources Information Center

    Klausmeier, Walter W.; Henshaw, Beverly

    Acquired Immune Deficiency Syndrome (AIDS) has become one of the most serious epidemic disease problems in recent years. In 1985 the Public Health Service recommended establishment of test sites where individuals might be tested for Human T Lymphotropic Virus III (HTLV-III) antibody. An HTLV-III antibody screening program was integrated into a…

  13. USDOE Office of Civilian Radioactive Waste Management quarterly report on program cost and schedule; Fourth Quarter, FY 1991

    SciTech Connect

    1991-12-31

    This report is intended to provide a summary of the cost and schedule performance for the Civilian Radioactive Waste Management Program. Historical and current cost profiles (extracted from the DOE Financial Information System) are presented for each of the major program elements. Also included in this report are the program schedule baseline, the status of near-term program milestones and the status of the Nuclear Waste Fund revenues and disbursements. In particular, cost profile for the Yucca Mountain Site Characterization Project is given. This report includes data through September 1991.

  14. Fuzzy linear programming based optimal fuel scheduling incorporating blending/transloading facilities

    SciTech Connect

    Djukanovic, M.; Babic, B.; Milosevic, B.; Sobajic, D.J.; Pao, Y.H. |

    1996-05-01

    In this paper the blending/transloading facilities are modeled using an interactive fuzzy linear programming (FLP), in order to allow the decision-maker to solve the problem of uncertainty of input information within the fuel scheduling optimization. An interactive decision-making process is formulated in which decision-maker can learn to recognize good solutions by considering all possibilities of fuzziness. The application of the fuzzy formulation is accompanied by a careful examination of the definition of fuzziness, appropriateness of the membership function and interpretation of results. The proposed concept provides a decision support system with integration-oriented features, whereby the decision-maker can learn to recognize the relative importance of factors in the specific domain of optimal fuel scheduling (OFS) problem. The formulation of a fuzzy linear programming problem to obtain a reasonable nonfuzzy solution under consideration of the ambiguity of parameters, represented by fuzzy numbers, is introduced. An additional advantage of the FLP formulation is its ability to deal with multi-objective problems.

  15. Adaptive dynamic programming algorithms for sequential appointment scheduling with patient preferences.

    PubMed

    Wang, Jin; Fung, Richard Y K

    2015-01-01

    A well-developed appointment system can help increase the utilization of medical facilities in an outpatient department. This paper outlines the development of an appointment system that can make an outpatient department work more efficiently and improve patient satisfaction level. A Markov decision process model is proposed to schedule sequential appointments with the consideration of patient preferences in order to maximize the patient satisfaction level. Adaptive dynamic programming algorithms are developed to avoid the curse of dimensionality. These algorithms can dynamically capture patient preferences, update the value of being a state, and thus improve the appointment decisions. Experiments were conducted to investigate the performance of the algorithms. The convergence behaviors under different settings, including the number of iterations needed for convergence and the accuracy of results, were examined. Bias-adjusted Kalman filter step-sizes were found to lead to the best convergence behavior, which stabilized within 5000 iterations. As for the effects of exploration and exploitation, it resulted in the best convergence behavior when the probability of taking a myopically optimal action equaled 0.9. The performance of value function approximation algorithm was greatly affected by the combination of basis functions. Under different combinations, errors varied from 2.7% to 8.3%. More preferences resulted in faster convergence, but required longer computation time. System parameters are adaptively updated as bookings are confirmed. The proposed appointment scheduling system could certainly contribute to better patient satisfaction level during the booking periods. Copyright © 2014 Elsevier B.V. All rights reserved.

  16. A Mixed Integer Linear Program for Solving a Multiple Route Taxi Scheduling Problem

    NASA Technical Reports Server (NTRS)

    Montoya, Justin Vincent; Wood, Zachary Paul; Rathinam, Sivakumar; Malik, Waqar Ahmad

    2010-01-01

    Aircraft movements on taxiways at busy airports often create bottlenecks. This paper introduces a mixed integer linear program to solve a Multiple Route Aircraft Taxi Scheduling Problem. The outputs of the model are in the form of optimal taxi schedules, which include routing decisions for taxiing aircraft. The model extends an existing single route formulation to include routing decisions. An efficient comparison framework compares the multi-route formulation and the single route formulation. The multi-route model is exercised for east side airport surface traffic at Dallas/Fort Worth International Airport to determine if any arrival taxi time savings can be achieved by allowing arrivals to have two taxi routes: a route that crosses an active departure runway and a perimeter route that avoids the crossing. Results indicate that the multi-route formulation yields reduced arrival taxi times over the single route formulation only when a perimeter taxiway is used. In conditions where the departure aircraft are given an optimal and fixed takeoff sequence, accumulative arrival taxi time savings in the multi-route formulation can be as high as 3.6 hours more than the single route formulation. If the departure sequence is not optimal, the multi-route formulation results in less taxi time savings made over the single route formulation, but the average arrival taxi time is significantly decreased.

  17. A methodology for the evaluation of program cost and schedule risk for the SEASAT program

    NASA Technical Reports Server (NTRS)

    Abram, P.; Myers, D.

    1976-01-01

    An interactive computerized project management software package (RISKNET) is designed to analyze the effect of the risk involved in each specific activity on the results of the total SEASAT-A program. Both the time and the cost of each distinct activity can be modeled with an uncertainty interval so as to provide the project manager with not only the expected time and cost for the completion of the total program, but also with the expected range of costs corresponding to any desired level of significance. The nature of the SEASAT-A program is described. The capabilities of RISKNET and the implementation plan of a RISKNET analysis for the development of SEASAT-A are presented.

  18. Issues in NASA Program and Project Management: Focus on Project Planning and Scheduling

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics addressed include: Planning and scheduling training for working project teams at NASA, overview of project planning and scheduling workshops, project planning at NASA, new approaches to systems engineering, software reliability assessment, and software reuse in wind tunnel control systems.

  19. QoS Differential Scheduling in Cognitive-Radio-Based Smart Grid Networks: An Adaptive Dynamic Programming Approach.

    PubMed

    Yu, Rong; Zhong, Weifeng; Xie, Shengli; Zhang, Yan; Zhang, Yun

    2016-02-01

    As the next-generation power grid, smart grid will be integrated with a variety of novel communication technologies to support the explosive data traffic and the diverse requirements of quality of service (QoS). Cognitive radio (CR), which has the favorable ability to improve the spectrum utilization, provides an efficient and reliable solution for smart grid communications networks. In this paper, we study the QoS differential scheduling problem in the CR-based smart grid communications networks. The scheduler is responsible for managing the spectrum resources and arranging the data transmissions of smart grid users (SGUs). To guarantee the differential QoS, the SGUs are assigned to have different priorities according to their roles and their current situations in the smart grid. Based on the QoS-aware priority policy, the scheduler adjusts the channels allocation to minimize the transmission delay of SGUs. The entire transmission scheduling problem is formulated as a semi-Markov decision process and solved by the methodology of adaptive dynamic programming. A heuristic dynamic programming (HDP) architecture is established for the scheduling problem. By the online network training, the HDP can learn from the activities of primary users and SGUs, and adjust the scheduling decision to achieve the purpose of transmission delay minimization. Simulation results illustrate that the proposed priority policy ensures the low transmission delay of high priority SGUs. In addition, the emergency data transmission delay is also reduced to a significantly low level, guaranteeing the differential QoS in smart grid.

  20. 75 FR 40039 - Medicare Program; Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-13

    ...This proposed rule addresses proposed changes to the physician fee schedule and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. It also addresses, implements or discusses certain provisions of both the Affordable Care Act and the Medicare Improvements for Patients and Providers Act of 2008. In addition, this proposed rule discusses payments under the Ambulance Fee Schedule, Clinical Laboratory Fee Schedule, payments to ESRD facilities, and payments for Part B drugs. Finally, the proposed rule includes a discussion regarding the Chiropractic Services Demonstration program, the Competitive Bidding Program for Durable Medical Equipment and Provider and Supplier Enrollment Issues associated with Air Ambulances. (See the Table of Contents for a listing of the specific issues addressed in this proposed rule.)

  1. 40 CFR 147.2200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CONTROL PROGRAMS Texas § 147.2200 State-administered program—Class I, III, IV, and V wells. The UIC program for Class I, III, IV, and V wells in the State of Texas, except for those wells on Indian lands, Class III brine mining wells, and certain Class V wells, is the program administered by the Texas...

  2. SELENIUM TREATMENT/REMOVAL ALTERNATIVES DEMONSTRATION PROJECT - MINE WASTE TECHNOLOGY PROGRAM ACTIVITY III, PROJECT 20

    EPA Science Inventory

    This document is the final report for EPA's Mine WAste Technology Program (MWTP) Activity III, Project 20--Selenium Treatment/Removal Alternatives Demonstration project. Selenium contamination originates from many sources including mining operations, mineral processing, abandoned...

  3. SELENIUM TREATMENT/REMOVAL ALTERNATIVES DEMONSTRATION PROJECT - MINE WASTE TECHNOLOGY PROGRAM ACTIVITY III, PROJECT 20

    EPA Science Inventory

    This document is the final report for EPA's Mine WAste Technology Program (MWTP) Activity III, Project 20--Selenium Treatment/Removal Alternatives Demonstration project. Selenium contamination originates from many sources including mining operations, mineral processing, abandoned...

  4. 10 CFR Appendix D to Part 73 - Physical Protection of Irradiated Reactor Fuel in Transit, Training Program Subject Schedule

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Physical Protection of Irradiated Reactor Fuel in Transit... Irradiated Reactor Fuel in Transit, Training Program Subject Schedule Pursuant to the provision of § 73.37 of... reactor fuel is required to assure that individuals used as shipment escorts have completed a...

  5. Scheduling elective surgeries: the tradeoff among bed capacity, waiting patients and operating room utilization using goal programming.

    PubMed

    Li, Xiangyong; Rafaliya, N; Baki, M Fazle; Chaouch, Ben A

    2017-03-01

    Scheduling of surgeries in the operating rooms under limited competing resources such as surgical and nursing staff, anesthesiologist, medical equipment, and recovery beds in surgical wards is a complicated process. A well-designed schedule should be concerned with the welfare of the entire system by allocating the available resources in an efficient and effective manner. In this paper, we develop an integer linear programming model in a manner useful for multiple goals for optimally scheduling elective surgeries based on the availability of surgeons and operating rooms over a time horizon. In particular, the model is concerned with the minimization of the following important goals: (1) the anticipated number of patients waiting for service; (2) the underutilization of operating room time; (3) the maximum expected number of patients in the recovery unit; and (4) the expected range (the difference between maximum and minimum expected number) of patients in the recovery unit. We develop two goal programming (GP) models: lexicographic GP model and weighted GP model. The lexicographic GP model schedules operating rooms when various preemptive priority levels are given to these four goals. A numerical study is conducted to illustrate the optimal master-surgery schedule obtained from the models. The numerical results demonstrate that when the available number of surgeons and operating rooms is known without error over the planning horizon, the proposed models can produce good schedules and priority levels and preference weights of four goals affect the resulting schedules. The results quantify the tradeoffs that must take place as the preemptive-weights of the four goals are changed.

  6. BASIC Simulation Programs; Volumes III and IV. Mathematics, Physics.

    ERIC Educational Resources Information Center

    Digital Equipment Corp., Maynard, MA.

    The computer programs presented here were developed as a part of the Huntington Computer Project. They were tested on a Digital Equipment Corporation TSS-8 time-shared computer and run in a version of BASIC. Mathematics and physics programs are presented in this volume. The 20 mathematics programs include ones which review multiplication skills;…

  7. Project Vitality; Phase III. A Program for the Handicapped.

    ERIC Educational Resources Information Center

    Santa Ana Unified School District, CA.

    The 1972-73 school year Project VITALITY is described to provide coordinated work study career development for students in grades seven through 12 or equivalent ages who are legally assigned to the special programs, students in the Teen Mothers program, and those students dismissed from the educable mentally retarded program after August 1, 1969.…

  8. 2012 Gordon Research Conference on Rock Deformation - Formal Schedule and Speaker/Poster Program

    SciTech Connect

    Kelemen, Peter

    2012-08-24

    The Gordon Research Conference on ROCK DEFORMATION was held at Proctor Academy Andover, New Hampshire, August 19-24, 2012. The Conference was well-attended with 124 participants (attendees list attached). The attendees represented the spectrum of endeavor in this field coming from academia, industry, and government laboratories, both U.S. and foreign scientists, senior researchers, young investigators, and students. Of the 124 attendees, 66 voluntarily responded to a general inquiry regarding ethnicity which appears on our registration forms. Of the 66 respondents, 8% were Minorities – 2% Hispanic, 6% Asian and 0% African American. Approximately 27% of the participants at the 2012 meeting were women. In designing the formal speakers program, emphasis was placed on current unpublished research and discussion of the future target areas in this field. There was a conscious effort to stimulate lively discussion about the key issues in the field today. Time for formal presentations was limited in the interest of group discussions. In order that more scientists could communicate their most recent results, poster presentation time was scheduled. Attached is a copy of the formal schedule and speaker program and the poster program. In addition to these formal interactions, "free time" was scheduled to allow informal discussions. Such discussions are fostering new collaborations and joint efforts in the field. Feedback processes are vitally important in controlling the rates and mechanisms of rock deformation. Positive feedbacks lead to accelerating rates, and commonly to spatial focusing. Localization and acceleration of creep is often associated with stress and/or strain rate dependent grain size reduction, frictional heating, or viscous shear heating. The presence of melt may help to localize and accelerate deformation, and in turn deformation may help to localize melt transport. Volume changes during retrograde metamorphic reactions may, under some circumstances, lead

  9. Microcomputerizing Your Paperwork. Part III: Financial Management Programs.

    ERIC Educational Resources Information Center

    Pogrow, Stanley

    1982-01-01

    Examines computerized financial accounting programs that can help administrators with the management of school finances. A detailed chart of financial accounting software packages for microcomputers is included. (JJD)

  10. Aspects of job scheduling

    NASA Technical Reports Server (NTRS)

    Phillips, K.

    1976-01-01

    A mathematical model for job scheduling in a specified context is presented. The model uses both linear programming and combinatorial methods. While designed with a view toward optimization of scheduling of facility and plant operations at the Deep Space Communications Complex, the context is sufficiently general to be widely applicable. The general scheduling problem including options for scheduling objectives is discussed and fundamental parameters identified. Mathematical algorithms for partitioning problems germane to scheduling are presented.

  11. Aspects of job scheduling

    NASA Technical Reports Server (NTRS)

    Phillips, K.

    1976-01-01

    A mathematical model for job scheduling in a specified context is presented. The model uses both linear programming and combinatorial methods. While designed with a view toward optimization of scheduling of facility and plant operations at the Deep Space Communications Complex, the context is sufficiently general to be widely applicable. The general scheduling problem including options for scheduling objectives is discussed and fundamental parameters identified. Mathematical algorithms for partitioning problems germane to scheduling are presented.

  12. Programs for Infants and Young Children. Part III: Health.

    ERIC Educational Resources Information Center

    Appalachian Regional Commission, Washington, DC.

    Directed toward the improvement of health care for mothers and young children, this report describes a number of comprehensive programs focused on health and reports on projects which have singled out one or more specific maternal or child health services. Included are descriptions of existing community programs for pregnant schoolgirls, health…

  13. School Bus Routing and Scheduling: When to Use Computer-Assisted Methods and Programs.

    ERIC Educational Resources Information Center

    Walcott, Wayne; And Others

    1986-01-01

    Discusses issues concerning the use of computers in school bus scheduling and routing. Examines the advantages, technical considerations, and costs of changing to a computerized system. Offers a five-point approach toward implementation and includes a table of comparative data for routing and scheduling models for a typical school bus fleet. (IW)

  14. SWOG S0221: A Phase III Trial Comparing Chemotherapy Schedules in High-Risk Early-Stage Breast Cancer

    PubMed Central

    Budd, George T.; Barlow, William E.; Moore, Halle C.F.; Hobday, Timothy J.; Stewart, James A.; Isaacs, Claudine; Salim, Muhammad; Cho, Jonathan K.; Rinn, Kristine J.; Albain, Kathy S.; Chew, Helen K.; Burton, Gary V.; Moore, Timothy D.; Srkalovic, Gordan; McGregor, Bradley A.; Flaherty, Lawrence E.; Livingston, Robert B.; Lew, Danika L.; Gralow, Julie R.; Hortobagyi, Gabriel N.

    2015-01-01

    Purpose To determine the optimal dose and schedule of anthracycline and taxane administration as adjuvant therapy for early-stage breast cancer. Patients and Methods A 2 × 2 factorial design was used to test two hypotheses: (1) that a novel continuous schedule of doxorubicin-cyclophosphamide was superior to six cycles of doxorubicin-cyclophosphamide once every 2 weeks and (2) that paclitaxel once per week was superior to six cycles of paclitaxel once every 2 weeks in patients with node-positive or high-risk node-negative early-stage breast cancer. With 3,250 patients, a disease-free survival (DFS) hazard ratio of 0.82 for each randomization could be detected with 90% power with two-sided α = .05. Overall survival (OS) was a secondary outcome. Results Interim analyses crossed the futility boundaries for demonstrating superiority of both once-per-week regimens and once-every-2-weeks regimens. After a median follow-up of 6 years, a significant interaction developed between the two randomization factors (DFS P = .024; OS P = .010) in the 2,716 patients randomly assigned in the original design, which precluded interpretation of the two factors separately. Comparing all four arms showed a significant difference in OS (P = .040) but not in DFS (P = .11), with all treatments given once every 2 weeks associated with the highest OS. This difference in OS seemed confined to patients with hormone receptor–negative/human epidermal growth factor receptor 2 (HER2) –negative tumors (P = .067), with no differences seen with hormone receptor–positive/HER2-negative (P = .90) or HER2-positive tumors (P = .40). Conclusion Patients achieved a similar DFS with any of these regimens. Subset analysis suggests the hypothesis that once-every-2-weeks dosing may be best for patients with hormone receptor–negative/HER2-negative tumors. PMID:25422488

  15. Shift Schedules and Intern Work Hours, Patient Numbers, Conference Attendance, and Sleep at a Single Pediatric Residency Program.

    PubMed

    Kocolas, Irene; Day, Kristen; King, Marta; Stevenson, Adam; Sheng, Xiaoming; Hobson, Wendy; Bruse, Jaime; Bale, James

    2017-03-01

    The effects of 2011 Accreditation Council on Graduate Medical Education (ACGME) duty hour standards on intern work hours, patient load, conference attendance, and sleep have not been fully determined. We prospectively compared intern work hours, patient numbers, conference attendance, sleep duration, pattern, and quality in a 2011 ACGME duty hour-compliant shift schedule with a 2003 ACGME duty hour-compliant call schedule at a single pediatric residency program. Interns were assigned to shift or call schedules during 4 alternate months in the winter of 2010-2011. Work hours, patient numbers, conference attendance, sleep duration, pattern, and quality were tracked. Interns worked significantly fewer hours per week on day (73.2 hours) or night (71.6 hours) shifts than during q4 call (79.6 hours; P < .01). During high census months, shift schedule interns cared for significantly more patients/day (8.1/day shift vs 6.2/call; P < .001) and attended significantly fewer conferences than call schedule interns. Night shift interns slept more hours per 24-hour period than call schedule interns (7.2 ± 0.5 vs 6.3 ± 0.9 hours; P < .05) and had more consistent sleep patterns. A shift schedule resulted in reduced intern work hours and improved sleep duration and pattern. Although intern didactic conference attendance declined significantly during high census months, opportunities for experiential learning remained robust with unchanged or increased intern patient numbers. Copyright © 2016 Academic Pediatric Association. Published by Elsevier Inc. All rights reserved.

  16. GRAPH III: a digitizing and graph plotting program

    SciTech Connect

    Selleck, C.B.

    1986-03-01

    GRAPH is an interactive program that allows the user to perform two functions. The first is to plot two dimensional graphs and the second is to digitize graphs or plots to create data files of points. The program is designed to allow the user to get results quickly and easily. It is written in RATIV (a FORTRAN preprocessor) and is currently in use at Sandia under VMS on a VAX computer and CTSS on a Cray supercomputer. The program provides graphical output through all of the Sandia Virtual Device Interface (VDI) graphics devices. 2 refs., 3 figs., 3 tabs.

  17. Ada Integrated Environment III Computer Program Development Specification. Volume III. Ada Optimizing Compiler.

    DTIC Science & Technology

    1981-12-01

    Corporation , Order No. GY28-6800-5 (December 1971). [IBM72] FORTRAN IV (H) Compiler Program Logic Manual, IBM Corporation , Order No. GH28-6642-5...RAVC ptans6 and excutes~ ’Leseatc, devetopment, .te,~t and 4etected acquisition p)LopLamn in -sappo~~t o6 Command, Con-tt Commnications ~ and

  18. DOE-EPRI distributed wind Turbine Verification Program (TVP III)

    SciTech Connect

    McGowin, C.; DeMeo, E.; Calvert, S.

    1997-12-31

    In 1992, the Electric Power Research Institute (EPRI) and the U.S. Department of Energy (DOE) initiated the Utility Wind Turbine Verification Program (TVP). The goal of the program is to evaluate prototype advanced wind turbines at several sites developed by U.S. electric utility companies. Two six MW wind projects have been installed under the TVP program by Central and South West Services in Fort Davis, Texas and Green Mountain Power Corporation in Searsburg, Vermont. In early 1997, DOE and EPRI selected five more utility projects to evaluate distributed wind generation using smaller {open_quotes}clusters{close_quotes} of wind turbines connected directly to the electricity distribution system. This paper presents an overview of the objectives, scope, and status of the EPRI-DOE TVP program and the existing and planned TVP projects.

  19. ITANA-III: A FORTRAN IV Program for Multiple-Choice Tests and Item Analysis

    ERIC Educational Resources Information Center

    Nevo, Barukh; And Others

    1975-01-01

    A two-phase FORTRAN IV program called ITANA-III for an IBM 1130 computer is described that permits computation of psychometric characteristics of multiple-choice examinations including test statistics (phase I) and item statistics (phase II). Consisting of 280 statements, the program can handle up to 200 items with not more than 9 alternatives…

  20. A Second Year Evaluation of the ESEA Title III Urban Leadership Program.

    ERIC Educational Resources Information Center

    Frerichs, Allen H.

    The Urban Leadership Program, funded under Title III of the Elementary and Secondary Education Act, was carried out among sixth graders at the Albert Einstein School in Chicago, Illinois. The primary purpose of the program was to develop skills and competence to prepare participants for survival and success in a large urban environment. A…

  1. Nonlinear model-based control of the Czochralski process III: Proper choice of manipulated variables and controller parameter scheduling

    NASA Astrophysics Data System (ADS)

    Neubert, M.; Winkler, J.

    2012-12-01

    This contribution continues an article series [1,2] about the nonlinear model-based control of the Czochralski crystal growth process. The key idea of the presented approach is to use a sophisticated combination of nonlinear model-based and conventional (linear) PI controllers for tracking of both, crystal radius and growth rate. Using heater power and pulling speed as manipulated variables several controller structures are possible. The present part tries to systematize the properties of the materials to be grown in order to get unambiguous decision criteria for a most profitable choice of the controller structure. For this purpose a material specific constant M called interface mobility and a more process specific constant S called system response number are introduced. While the first one summarizes important material properties like thermal conductivity and latent heat the latter one characterizes the process by evaluating the average axial thermal gradients at the phase boundary and the actual growth rate at which the crystal is grown. Furthermore these characteristic numbers are useful for establishing a scheduling strategy for the PI controller parameters in order to improve the controller performance. Finally, both numbers give a better understanding of the general thermal system dynamics of the Czochralski technique.

  2. Hawaii Integrated Biofuels Research Program: Final Subcontract Report, Phase III

    SciTech Connect

    Not Available

    1992-05-01

    This report is a compilation of studies done to develop an integrated set of strategies for the production of energy from renewable resources in Hawaii. Because of the close coordination between this program and other ongoing DOE research, the work will have broad-based applicability to the entire United States.

  3. Small Business Management Volume III: Curriculum. An Adult Education Program.

    ERIC Educational Resources Information Center

    Persons, Edgar A.; Swanson, Gordon I.

    The small business management adult education program outlined in this curriculum guide is designed to help small business entrepreneurs solve their business management problems and attain the goals they have established for their businesses and their families. (An instructor's manual and practice problems are in separate volumes.) The 3-year…

  4. Evaluation Report III: The Robert Noyce Scholarship Program at CSUB

    ERIC Educational Resources Information Center

    Wang, Jianjun

    2013-01-01

    California State University, Bakersfield (CSUB) received funding from National Science Foundation's (NSF) Robert Noyce Teacher Scholarship Program to recruit Noyce Scholars from upper-division science, technology, engineering, and mathematics (STEM) majors, graduate students, and professionals switched to STEM teaching from other fields (NSF…

  5. A Division III Student-Athlete Academic Support Program Model.

    ERIC Educational Resources Information Center

    Smith, David A.; Herman, William E.

    Varsity student-athletes (SAs) in National Collegiate Athletic Association member institutions encounter obstacles to their academic achievement that non-athletes do not, such as time for physical training and practice, and travel away from campus for games. A program is described that provides support for SAs. The Student-Athlete Academic Support…

  6. Development of Milestone Schedules for Selected Logistics Support Directorate Programs. Appendix A. Part 2. Task Summaries.

    DTIC Science & Technology

    1987-09-15

    RESPONSIBILITY: HQDA, DCSLOG DURATION: 99.00 WORK DAYS *FSFBIQQ SCHEDULE: FS SUBPROJECT FOR THE AMMENDING PROCESS OF THE BASIS OF ISSUE CODE NUMBER...SUBPROGRAM LIFE CYCLE MANAGEMENT MODEL. RESPONSIBILITY: BELVOIR LAB " DURATION: 180.00 WORK DAYS 1ST SPC SCHEDULE: FS THE DATE THE FIRST STAFF PLANNERS...FSFBIQQ THE SIGNED AMMENDED BASIS OF ISSUE PLAN (ABOIP), AMENDED CODE NUMBER: AMMS3520 QUALITATIVE AND QUANTITATIVE PERSONNEL REQUIREMENTS RESPONSIBILITY

  7. Optimally Scheduling Basic Courses at the Defense Language Institute using Integer Programming

    DTIC Science & Technology

    2005-09-01

    of timetable models. Carrasco and Pato [2004] provide a good summary of current research. Scheduling exams and course scheduling have similar...and Kaplansky 2004]. Carrasco and Pato [2004] generate and compare a neural network and a simulation annealing algorithm. 7 Daskalaki, et al...Operational Research. 158. 533-542. Carrasco, M., Pato , M. (2004). A comparison of discrete and continuous neural network approaches to solve the

  8. Does the benefits schedule of cash assistance programs affect the purchase of temptation goods? Evidence from Peru.

    PubMed

    White, Justin S; Basu, Sanjay

    2016-03-01

    A critique of cash assistance programs is that beneficiaries may spend the money on "temptation goods" such as alcohol and tobacco. We exploit a change in the payment schedule of Peru's conditional cash transfer program to identify the impact of benefit receipt frequency on the purchase of temptation goods. We use annual household data among cross-sectional and panel samples to analyze the effect of the policy change on the share of the household budget devoted to four categories of temptation goods. Using a difference-in-differences estimation approach, we find that larger, less frequent payments increased the expenditure share of alcohol by 55-80% and sweets by 10-40%, although the absolute magnitudes of these effects are small. Our study suggests that less frequent benefits scheduling may lead cash recipients to make certain types of temptation purchases.

  9. Medicare program; schedule of limits on home health agency costs per visit for cost reporting periods beginning on or after July 1, 1991--HCFA. Notice with comment period.

    PubMed

    1991-12-09

    This notice sets forth a revised schedule of limits on home health agency costs that may be paid under the Medicare program. This revised schedule of limits applies to cost reporting periods beginning on or after July 1, 1991. As required by section 4207(d) of the Omnibus Budget Reconciliation Act of 1990 (Pub. L. 101-508), this revised schedule of limits incorporates a blended hospital wage index.

  10. Medicare program; schedule of limits on home health agency costs per visit for cost reporting periods beginning on or after July 1, 1992--HCFA. Notice with comment period.

    PubMed

    1992-07-01

    This notice sets forth a revised schedule of limits on home health agency costs that may be paid under the Medicare program. This revised schedule of limits applies to cost reporting periods beginning on or after July 1, 1992. As required by section 4207(d)(3)(B) of the Omnibus Budget Reconciliation Act of 1990 (Pub. L. 101-508), this revised schedule of limits incorporates a blended hospital wage index.

  11. Flexible Scheduling.

    ERIC Educational Resources Information Center

    Davis, Harold S.; Bechard, Joseph E.

    A flexible schedule allows teachers to change group size, group composition, and class length according to the purpose of the lesson. This pamphlet presents various "master" schedules for flexible scheduling: (1) Simple block schedules, (2) back-to-back schedules, (3) interdisciplinary schedules, (4) school-wide block schedules, (5) open-lab…

  12. Bioterrorism preparedness. III: State and federal programs and response.

    PubMed

    Mothershead, Jerry L; Tonat, Kevin; Koenig, Kristi L

    2002-05-01

    Management of a bioterrorism event will begin with early detection and intervention at the local level. Any large-scale event will require rapid state and federal assistance. Federal initiatives targeting bioterrorism have increasingly become a complex web of executive and legislative actions, frequently initiated in reaction to specific events, and often unrelated to this threat. Multiple executive and legislative branch actions have resulted in a proliferation of federal programs, and coordination of these efforts remains a significant challenge. Still, great strides have been taken to improve our defensive posture against this emerging threat, and, at all levels, governmental authorities and agencies are much better prepared to respond to such events than they were a decade ago. The events of September 11, 2001 and subsequent events are clear indicators that the timeline for preparedness has been significantly compressed. Federal emergency operations, historically designed more for recovery than response, seemed up to the task in the wake of the World Trade Center and Pentagon attacks, although there was criticism of federal responsiveness to the subsequent anthrax incidents [71,72], and the timeliness of federal resources in the event of a large-scale outbreak resulting from a bioterrorism attack has yet to be truly tested. The recent establishment of the Office of Homeland Security and the Homeland Security Council holds promise that some of these inefficiencies may be rectified and overall coordination of programs will improve. Continued improvements in the effectiveness of the federal government in meeting the challenges of this and other emerging threats to homeland security will require: Establishment of consensus standards, metrics, and measures of effectiveness for all aspects of disaster, epidemic, and terrorism management at the local, regional, state, and federal levels Delineation of expected, quantifiable state and local capabilities to mitigate

  13. 40 CFR 147.650 - State-administrative program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CONTROL PROGRAMS Idaho § 147.650 State-administrative program—Class I, II, III, IV, and V wells. The UIC program for Class I, II, III, IV, and V wells in the State of Idaho, other than those on Indian lands, is the program administered by the Idaho Department of Water Resources, approved by EPA pursuant to...

  14. 40 CFR 147.650 - State-administrative program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CONTROL PROGRAMS Idaho § 147.650 State-administrative program—Class I, II, III, IV, and V wells. The UIC program for Class I, II, III, IV, and V wells in the State of Idaho, other than those on Indian lands, is the program administered by the Idaho Department of Water Resources, approved by EPA pursuant to...

  15. 40 CFR 147.650 - State-administrative program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CONTROL PROGRAMS Idaho § 147.650 State-administrative program—Class I, II, III, IV, and V wells. The UIC program for Class I, II, III, IV, and V wells in the State of Idaho, other than those on Indian lands, is the program administered by the Idaho Department of Water Resources, approved by EPA pursuant to...

  16. 24 CFR 8.29 - Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self-help programs). 8.29 Section 8.29...), Turnkey III and Indian housing mutual self-help programs). Any housing units newly constructed...

  17. 24 CFR 8.29 - Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self-help programs). 8.29 Section 8.29...), Turnkey III and Indian housing mutual self-help programs). Any housing units newly constructed...

  18. 24 CFR 8.29 - Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self-help programs). 8.29 Section 8.29...), Turnkey III and Indian housing mutual self-help programs). Any housing units newly constructed...

  19. 24 CFR 8.29 - Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self-help programs). 8.29 Section 8.29...), Turnkey III and Indian housing mutual self-help programs). Any housing units newly constructed...

  20. 40 CFR 147.1801 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CONTROL PROGRAMS Ohio § 147.1801 State-administered program—Class I, III, IV and V wells. The UIC program for Class I, III, IV, and V wells in the State of Ohio, other than those on Indian lands, is the program administered by the Ohio Department of Natural Resources and the Ohio Environmental...

  1. 40 CFR 147.1250 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CONTROL PROGRAMS Mississippi § 147.1250 State-administered program—Class I, III, IV, and V wells. The UIC program for Class I, III, IV and V wells in the State of Mississippi, except those on Indian lands, is the program administered by the Mississippi Department of Natural Resources approved by EPA pursuant...

  2. 40 CFR 147.1250 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CONTROL PROGRAMS Mississippi § 147.1250 State-administered program—Class I, III, IV, and V wells. The UIC program for Class I, III, IV and V wells in the State of Mississippi, except those on Indian lands, is the program administered by the Mississippi Department of Natural Resources approved by EPA pursuant...

  3. 40 CFR 147.1250 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... CONTROL PROGRAMS Mississippi § 147.1250 State-administered program—Class I, III, IV, and V wells. The UIC program for Class I, III, IV and V wells in the State of Mississippi, except those on Indian lands, is the program administered by the Mississippi Department of Natural Resources approved by EPA pursuant...

  4. 40 CFR 147.1250 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CONTROL PROGRAMS Mississippi § 147.1250 State-administered program—Class I, III, IV, and V wells. The UIC program for Class I, III, IV and V wells in the State of Mississippi, except those on Indian lands, is the program administered by the Mississippi Department of Natural Resources approved by EPA pursuant...

  5. 40 CFR 147.1250 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CONTROL PROGRAMS Mississippi § 147.1250 State-administered program—Class I, III, IV, and V wells. The UIC program for Class I, III, IV and V wells in the State of Mississippi, except those on Indian lands, is the program administered by the Mississippi Department of Natural Resources approved by EPA pursuant...

  6. 40 CFR 147.500 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CONTROL PROGRAMS Florida § 147.500 State-administered program—Class I, III, IV, and V wells. The UIC program for Class I, III, IV, and V wells in the State of Florida, except for those on Indian lands is... 40 Protection of Environment 22 2010-07-01 2010-07-01 false State-administered program-Class...

  7. 40 CFR 147.850 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS Kansas § 147.850 State-administered program—Class I, III, IV and V wells. The UIC program for Class I, III, IV and V wells in the State of Kansas, except those on Indian lands as described in § 147... 40 Protection of Environment 22 2010-07-01 2010-07-01 false State-administered program-Class...

  8. 40 CFR 147.700 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CONTROL PROGRAMS Illinois § 147.700 State-administered program—Class I, III, IV, and V wells. The UIC program for Class I, III, IV and V wells in the State of Illinois, except those on Indian lands, is the... 40 Protection of Environment 22 2010-07-01 2010-07-01 false State-administered program-Class...

  9. Turning Over Turnover: The Evaluation of a Staff Scheduling System in a Community-Based Program for Adults with Developmental Disabilities

    ERIC Educational Resources Information Center

    Strouse, Michael C.; Carroll-Hernandez, Tammy A.; Sherman, James A.; Sheldon, Jan B.

    2004-01-01

    Human service programs often have major problems ensuring that all direct-care staff positions are filled and keeping staff members after they are hired. Work schedules may have an effect on maintaining the longevity of staff. The purpose of this study was to evaluate the effects of a revised direct-care staff-scheduling system in community homes…

  10. CHAP III- CHARRING ABLATOR PROGRAM FOR ADVANCED INVESTIGATION OF THERMAL PROTECTION SYSTEMS FOR ENTRY

    NASA Technical Reports Server (NTRS)

    Stroud, C. W.

    1994-01-01

    The transient response of a thermal protection material to heat applied to the surface can be calculated using the CHAP III computer program. CHAP III can be used to analyze pyrolysis gas chemical kinetics in detail and examine pyrolysis reactions-indepth. The analysis includes the deposition of solid products produced by chemical reactions in the gas phase. CHAP III uses a modelling technique which can approximate a wide range of ablation problems. The energy equation used in CHAP III incorporates pyrolysis (both solid and gas reactions), convection, conduction, storage, work, kinetic energy, and viscous dissipation. The chemically reacting components of the solid are allowed to vary as a function of position and time. CHAP III employs a finite difference method to approximate the energy equations. Input values include specific heat, thermal conductivity, thermocouple locations, enthalpy, heating rates, and a description of the chemical reactions expected. The output tabulates the temperature at locations throughout the ablator, gas flow within the solid, density of the solid, weight of pyrolysis gases, and rate of carbon deposition. A sample case is included, which analyzes an ablator material containing several pyrolysis reactions subjected to an environment typical of entry at lunar return velocity. CHAP III is written in FORTRAN IV for batch execution and has been implemented on a CDC CYBER 170 series computer operating under NOS with a central memory requirement of approximately 102K (octal) of 60 bit words. This program was developed in 1985.

  11. CHAP III- CHARRING ABLATOR PROGRAM FOR ADVANCED INVESTIGATION OF THERMAL PROTECTION SYSTEMS FOR ENTRY

    NASA Technical Reports Server (NTRS)

    Stroud, C. W.

    1994-01-01

    The transient response of a thermal protection material to heat applied to the surface can be calculated using the CHAP III computer program. CHAP III can be used to analyze pyrolysis gas chemical kinetics in detail and examine pyrolysis reactions-indepth. The analysis includes the deposition of solid products produced by chemical reactions in the gas phase. CHAP III uses a modelling technique which can approximate a wide range of ablation problems. The energy equation used in CHAP III incorporates pyrolysis (both solid and gas reactions), convection, conduction, storage, work, kinetic energy, and viscous dissipation. The chemically reacting components of the solid are allowed to vary as a function of position and time. CHAP III employs a finite difference method to approximate the energy equations. Input values include specific heat, thermal conductivity, thermocouple locations, enthalpy, heating rates, and a description of the chemical reactions expected. The output tabulates the temperature at locations throughout the ablator, gas flow within the solid, density of the solid, weight of pyrolysis gases, and rate of carbon deposition. A sample case is included, which analyzes an ablator material containing several pyrolysis reactions subjected to an environment typical of entry at lunar return velocity. CHAP III is written in FORTRAN IV for batch execution and has been implemented on a CDC CYBER 170 series computer operating under NOS with a central memory requirement of approximately 102K (octal) of 60 bit words. This program was developed in 1985.

  12. [Vaccination--General concepts. Systematic vaccination schedules for the child and adult in Spain. Impact of vaccination programs].

    PubMed

    Arrazola Martínez, M Pilar; de Juanes Pardo, José Ramón; García de Codes Ilario, Aurelia

    2015-01-01

    One area of major importance in promoting health is the prevention of infectious diseases through vaccination. Vaccine is any preparation intended to generate immunity against a disease by stimulating the production of antibodies. There are two basic types: live attenuated and inactivated, with different characteristics that determine their use. The main properties of a vaccine are safety and protective efficacy. The vaccines can be administered based on individualized directions depending on various factors (personal, environmental…), or systematically as part of the immunization schedules. In Spain, the first childhood immunization schedule was implemented in 1975. The Autonomous Communities are currently responsible for establishing vaccine recommendations. The incidence of vaccine-preventable diseases and vaccination coverage are essential criteria for the evaluation of vaccination programs. In Spain the incidence of vaccine-preventable diseases is low. Vaccination coverage is high in childhood, but in adolescents, adults and groups at risk it is not always appropriate.

  13. Schedule Risk Event Driven Methodology (SREDM): FY13 Army Studies Program Project Findings

    DTIC Science & Technology

    2015-01-01

    SUPPLEMENTARY NOTES 14. ABSTRACT AMSAA conducts independent schedule risk assessments to support Analysis of Alternatives (AoAs). AMSAA’s current...research topics include selecting analogous data and technical risk assessment integration. 15. SUBJECT TERMS analysis of alternatives , AMSAA...Army Materiel Systems Analysis Activity AoA - Analysis of Alternatives ATEC - Army Test and Evaluation Command BC - Bias Corrected

  14. Content Analysis Schedule for Bilingual Education Programs: Programa en Dos Lenguas.

    ERIC Educational Resources Information Center

    Ludanyi, R. P.; Shore, Marietta Saravia

    This content analysis schedule for the "Programa en Dos Lenguas" of Fort Worth, Texas, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the…

  15. Space Shuttle 1976 into mainstream development - Program commitments on schedule to insure careful progress

    NASA Technical Reports Server (NTRS)

    Malkin, M. S.

    1976-01-01

    A progress report is given on various systems, noting conformity to schedule or changes in design. The Orbiter thermal protection system, the Space Shuttle main engine, the intertank for the structural test article (STA), thrust vector control systems, the Kennedy Space Center launch processing system, and Orbiters No. 1 and No. 2 are discussed.

  16. Content Analysis Schedule for Bilingual Education Programs: BICEP Intercambio de la Cultura.

    ERIC Educational Resources Information Center

    Shore, Marietta Saravia; Nafus, Charles

    This content analysis schedule for BICEP Intercambio de la Cultura (San Bernardino, California), presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the…

  17. Content Analysis Schedule for Bilingual Education Programs: BICEP Intercambio de la Cultura.

    ERIC Educational Resources Information Center

    Shore, Marietta Saravia; Nafus, Charles

    This content analysis schedule for BICEP Intercambio de la Cultura (San Bernardino, California), presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the…

  18. Operational ET remote sensing (RS) program for irrigation scheduling and management: challenges and opportunities

    Treesearch

    Prasanna Gowda

    2016-01-01

    Evapotranspiration (ET) is an essential component of the water balance and a major consumptive use of irrigation water and precipitation on cropland. Any attempt to improve water use efficiency must be based on reliable estimates of ET for irrigation scheduling purposes.

  19. Evaluation of the ESEA Title III Program: "Educational Resources Center on the Negro Heritage." Final Report.

    ERIC Educational Resources Information Center

    Neyman, Clinton A., Jr.; Riordan, Anne M.

    The purpose of this study was to evaluate the ESEA Title III project of the African Museum of Art/Frederick Douglass Institute as conducted in the District of Columbia Public Schools. The Institute sought to further its education program to meet the increasing demand for materials, activities, and resources dealing with the cultural and historical…

  20. Revenues & Expenses, 2004-2009. NCAA[R] Division III Intercollegiate Athletics Programs Report

    ERIC Educational Resources Information Center

    Fulks, Daniel L., Comp.

    2010-01-01

    This report provides summary information concerning revenues and expenses of the National Collegiate Athletic Association (NCAA) Division III athletics programs for the fiscal years 2004 through 2009. It is the result of surveys conducted during the fall of each of those years. Although similar studies have been conducted for the NCAA since 1969,…

  1. Final Report: Pilot Region-Based Optimization Program for Fund-Lead Sites, EPA Region III

    EPA Pesticide Factsheets

    This report describes a pilot study for a Region-based optimization program, implemented by a Regional Optimization Evaluation Team (ROET) that was conducted in U.S. EPA Region III at Fund-lead sites with pump-and-treat (P&T) systems.

  2. Sequential Mathematics Course III. Volume One. Staff Development Program 1986-1987.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Div. of Curriculum and Instruction.

    The Sequential Mathematics Sequence provides students with an integrated course of study, including lessons which interweave algebra, geometry, logic, probability, and mathematical systems. This handbook is designed to meet the needs of teachers who will be teaching Course III in the sequence. The handbook, for use with staff development programs,…

  3. Minuteman Stage III Operational Surveillance Program Seven-Year Testing Bondline Aging Study,

    DTIC Science & Technology

    1985-12-01

    Liner Gel Fraction at Various Motor Locations ......... . . 25 14 Liner Moisture at Various Motor Locations ............. ... 26 6 15 Motor TC 30005 ...PageI ,,. 18 Shore A Hardness Gradient of ANB-3066 Propellant at the Forward Equator ........ ...................... .. 30 19 Motor TC 30005 ...75 I 2 Matrix for Minuteman Stage III Bondline Aging Program ........ 76 3 Motor TC 30005 Material Properties Data, Forward

  4. Oregon Small Schools Program: A Title III Project. Independent Evaluation Report.

    ERIC Educational Resources Information Center

    Educational Coordinates Northwest, Salem, OR.

    An independent evaluation report (May 1971) by Educational Coordinates Northwest, this document examines the Oregon Small Schools Program (a Title III project of the Elementary and Secondary Education Act). Three major areas were considered: the extent to which member schools implemented methodological and organizational changes, the established…

  5. Analysis of Schedule Determination in Software Program Development and Software Development Estimation Models

    DTIC Science & Technology

    1988-09-01

    successfully analyze the software estimation models I chose for this thesis, I first had to have access to them. I am thankful to Professor Daniel V. Ferens for...the software are not properly specified and defined, accurate schedule determination will be difficult. Walt Scacchi , in his article "Managing Software...21. Ferens, Daniel V. An Introduction to Software Para ec ost ZtintIng, Wright-Patterson AFB ON: Aix Force Institute of Technology, 1987. 22. Funch

  6. 2012 Gordon Research Conference and Seminar on Atomic and Molecular Interactions - Formal Schedule and Speaker/Poster Program

    SciTech Connect

    Zwier, Timothy S.

    2012-07-20

    The Gordon Research Conference on ATOMIC & MOLECULAR INTERACTIONS was held at Stonehill College Easton, Massachusetts, July 15-20, 2012. The Conference was well-attended with 121 participants (attendees list attached). The attendees represented the spectrum of endeavor in this field coming from academia, industry, and government laboratories, both U.S. and foreign scientists, senior researchers, young investigators, and students. Of the 121 attendees, 64 voluntarily responded to a general inquiry regarding ethnicity which appears on our registration forms. Of the 64 respondents, 11% were Minorities – 2% Hispanic, 9% Asian and 0% African American. Approximately 20% of the participants at the 2012 meeting were women. The Gordon Research SEMINAR on ATOMIC & MOLECULAR INTERACTIONS was held at Stonehill College Easton, Massachusetts, July 14 - 15, 2012. The Conference was well-attended with 42 participants (attendees list attached). The attendees represented the spectrum of endeavor in this field coming from academia, industry, and government laboratories, both U.S. and foreign scientists, senior researchers, young investigators, and students. Of the 42 attendees, 20 voluntarily responded to a general inquiry regarding ethnicity which appears on our registration forms. Of the 20 respondents, 10% were Minorities – 0% Hispanic, 10% Asian and 0% African American. Approximately 29% of the participants at the 2012 meeting were women. In designing the formal speakers program, emphasis was placed on current unpublished research and discussion of the future target areas in this field. There was a conscious effort to stimulate lively discussion about the key issues in the field today. Time for formal presentations was limited in the interest of group discussions. In order that more scientists could communicate their most recent results, poster presentation time was scheduled. Attached is a copy of the formal schedule and speaker program and the poster program. In addition to

  7. 2012 Gordon Research Conference on Graphitic Carbon Materials, Chemistry and Physics of - Formal Schedule and Speaker/Poster Program

    SciTech Connect

    Fertig, Herbert A.

    2012-06-22

    The Gordon Research Conference on GRAPHITIC CARBON MATERIALS, CHEMISTRY AND PHYSICS OF was held at the Davidson College, Davidson, North Carolina, June 17 – 22, 2012. The Conference was well-attended with 95 participants (attendees list attached). The attendees represented the spectrum of endeavor in this field coming from academia, industry, and government laboratories, both U.S. and foreign scientists, senior researchers, young investigators, and students. Of the 95 attendees, 41 voluntarily responded to a general inquiry regarding ethnicity which appears on our registration forms. Of the 41 respondents, 49% were Minorities – 5% Hispanic, 44% Asian and 0% African American. Approximately 2% of the participants at the 2012 meeting were women. In designing the formal speakers program, emphasis was placed on current unpublished research and discussion of the future target areas in this field. There was a conscious effort to stimulate lively discussion about the key issues in the field today. Time for formal presentations was limited in the interest of group discussions. In order that more scientists could communicate their most recent results, poster presentation time was scheduled. Attached is a copy of the formal schedule and speaker program and the poster program. In addition to these formal interactions, "free time" was scheduled to allow informal discussions. Such discussions are fostering new collaborations and joint efforts in the field. Carbon materials play an extremely important role in our society. They not only constitute the largest supply of energy we use today (i.e., coal) but also are the bases of many important technologies ranging from pencils, adsorbents, and metal strengtheners, to batteries and many others. Recent studies on graphitic carbon, including fullerenes, carbon nanotubes, and graphene, have further revealed novel optical and electrical properties, making it possible to use them for new applications in renewable energy as well as

  8. 78 FR 65621 - Implementation of Title I/II Program Initiatives; Extension of Public Comment Period; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF EDUCATION Implementation of Title I/II Program Initiatives; Extension of Public Comment Period; Correction AGENCY... comment for an information collection entitled, ``Implementation of Title I/II Program...

  9. 40 CFR 147.500 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CONTROL PROGRAMS Florida § 147.500 State-administered program—Class I, III, IV, and V wells. The UIC program for Class I, III, IV, and V wells in the State of Florida, except for those on Indian lands is administered by the Florida Department of Environmental Regulations, approved by EPA pursuant to section 1422...

  10. 40 CFR 147.500 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CONTROL PROGRAMS Florida § 147.500 State-administered program—Class I, III, IV, and V wells. The UIC program for Class I, III, IV, and V wells in the State of Florida, except for those on Indian lands is administered by the Florida Department of Environmental Regulations, approved by EPA pursuant to section 1422...

  11. 40 CFR 147.301 - EPA-administered program-Class I, III, IV, V wells and Indian lands.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... INJECTION CONTROL PROGRAMS Colorado § 147.301 EPA-administered program—Class I, III, IV, V wells and Indian lands. (a) Contents. The UIC program for Class I, III, IV and V wells on all lands in Colorado... EPA-administered wells in Colorado other than Class II wells on the lands of the Ute Mountain Ute...

  12. 40 CFR 147.301 - EPA-administered program-Class I, III, IV, V wells and Indian lands.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... INJECTION CONTROL PROGRAMS Colorado § 147.301 EPA-administered program—Class I, III, IV, V wells and Indian lands. (a) Contents. The UIC program for Class I, III, IV and V wells on all lands in Colorado... EPA-administered wells in Colorado other than Class II wells on the lands of the Ute Mountain Ute...

  13. 40 CFR 147.301 - EPA-administered program-Class I, III, IV, V wells and Indian lands.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... INJECTION CONTROL PROGRAMS Colorado § 147.301 EPA-administered program—Class I, III, IV, V wells and Indian lands. (a) Contents. The UIC program for Class I, III, IV and V wells on all lands in Colorado... EPA-administered wells in Colorado other than Class II wells on the lands of the Ute Mountain Ute...

  14. 40 CFR 147.301 - EPA-administered program-Class I, III, IV, V wells and Indian lands.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... INJECTION CONTROL PROGRAMS Colorado § 147.301 EPA-administered program—Class I, III, IV, V wells and Indian lands. (a) Contents. The UIC program for Class I, III, IV and V wells on all lands in Colorado... EPA-administered wells in Colorado other than Class II wells on the lands of the Ute Mountain Ute...

  15. 40 CFR 147.251 - EPA-administered program-Class I, III, IV and V wells and Indian lands.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false EPA-administered program-Class I, III, IV and V wells and Indian lands. 147.251 Section 147.251 Protection of Environment ENVIRONMENTAL... INJECTION CONTROL PROGRAMS California § 147.251 EPA-administered program—Class I, III, IV and V wells...

  16. Medicare and Medicaid programs: schedules of guidelines for physical therapy and respiratory therapy services--Health Care Financing Administration. Final notice with a request for comments.

    PubMed

    1981-02-25

    This notice amends the current schedules of salary equivalency guidelines for Medicare program reimbursement for the reasonable costs of physical therapy and respiratory therapy services furnished under an arrangement with a hospital or other provider. The schedules will be used by the program's fiscal intermediaries to determine the maximum allowable cost of such services. These schedules update the schedule published on October 6, 1978 (43 FR 46377), for physical therapy services, and those published on June 3, 1980 (45 FR 37527), for respiratory therapy services. In addition, these guidelines apply to reimbursement under the Medicaid program where they have been incorporated in the State plans or where States follow the Medicare principles of reimbursement.

  17. The National Heart, Lung, and Blood Institute Recipient Epidemiology and Donor Evaluation Study (REDS-III): A research program striving to improve blood donor and transfusion recipient outcomes

    PubMed Central

    Kleinman, Steven; Busch, Michael P; Murphy, Edward L; Shan, Hua; Ness, Paul; Glynn, Simone A.

    2014-01-01

    Background The Recipient Epidemiology and Donor Evaluation Study -III (REDS-III) is a 7-year multicenter transfusion safety research initiative launched in 2011 by the National Heart, Lung, and Blood Institute. Study design The domestic component involves 4 blood centers, 12 hospitals, a data coordinating center, and a central laboratory. The international component consists of distinct programs in Brazil, China, and South Africa which involve US and in-country investigators. Results REDS-III is using two major methods to address key research priorities in blood banking/transfusion medicine. First, there will be numerous analyses of large “core” databases; the international programs have each constructed a donor/donation database while the domestic program has established a detailed research database that links data from blood donors and their donations, the components made from these donations, and data extracts from the electronic medical records of the recipients of these components. Secondly, there are more than 25 focused research protocols involving transfusion recipients, blood donors, or both that are either in progress or scheduled to begin within the next 3 years. Areas of study include transfusion epidemiology and blood utilization; transfusion outcomes; non-infectious transfusion risks; HIV-related safety issues (particularly in the international programs); emerging infectious agents; blood component quality; donor health and safety; and other donor issues. Conclusions It is intended that REDS-III serve as an impetus for more widespread recipient and linked donor-recipient research in the US as well as to help assure a safe and available blood supply in the US and in international locations. PMID:24188564

  18. The Stanford School Scheduling System.

    ERIC Educational Resources Information Center

    Stanford Univ., CA. Dept. of Industrial Engineering.

    This booklet gives a general overview of the computerized Stanford School Scheduling System (SSSS) which is designed to make scheduling less difficult for individualized programs in secondary education. Topics covered include new flexible scheduling and variable course structure designs in secondary education, the school scheduling problem,…

  19. Priorities and allocations support for energy: keeping energy programs on schedule

    SciTech Connect

    Not Available

    1985-08-01

    This publication has covered DOE and DOC procedures related to an application for rating authority for an energy program, the DPAS (Defense Priorities and Allocations System) and the Special Priorities Assistance Program's relation to priorities and allocations for energy programs. A person engaged in an eligible energy program or project must be familiar with DPAS rules, regulations and procedures. There are important benefits to be gained by the Government and the energy industry through the proper use of the priorities and allocations system.

  20. 76 FR 42771 - Medicare Program; Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-19

    ...This proposed rule addresses changes to the physician fee schedule and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. It also addresses, implements or discusses certain provisions of the Patient Protection and Affordable Care Act, as amended by the Health Care and Education Reconciliation Act of 2010 (collectively known as the Affordable Care Act) and the Medicare Improvements for Patients and Providers Act of 2008. In addition, this proposed rule discusses payments for Part B drugs; Physician Quality Reporting System; the Electronic Prescribing (eRx) Incentive Program; the Physician Resource-Use Feedback Program and the value modifier; productivity adjustment for ambulatory surgical center payment system and the ambulance, clinical laboratory, and durable medical equipment prosthetics orthotics and supplies (DMEPOS) fee schedules; and other Part B related issues. (See the Table of Contents for a listing of the specific issues addressed in this proposed rule.)

  1. A possibilistic programming approach for the location problem of multiple cross-docks and vehicle routing scheduling under uncertainty

    NASA Astrophysics Data System (ADS)

    Meysam Mousavi, S.; Tavakkoli-Moghaddam, Reza; Jolai, Fariborz

    2013-10-01

    This article considers the design of cross-docking systems under uncertainty in a model that consists of two phases: (1) a strategic-based decision-making process for selecting the location of cross-docks to operate, and (2) an operational-based decision-making process for vehicle routing scheduling with multiple cross-docks. This logistic system contains three echelons, namely suppliers, cross-docks and retailers, in an uncertain environment. In the first phase, a new multi-period cross-dock location model is introduced to determine the minimum number of cross-docks among a set of location sites so that each retailer demand should be met. Then, in the second phase, a new vehicle routing scheduling model with multiple cross-docks is formulated in which each vehicle is able to pickup from or deliver to more than one supplier or retailer, and the pickup and delivery routes start and end at the corresponding cross-dock. This article is the first attempt to introduce an integrated model for cross-docking systems design under a fuzzy environment. To solve the presented two-phase mixed-integer programming (MIP) model, a new fuzzy mathematical programming-based possibilistic approach is used. Furthermore, experimental tests are carried out to demonstrate the effectiveness of the presented model. The computational results reveal the applicability and suitability of the developed fuzzy possibilistic two-phase model in a variety of problems in the domain of cross-docking systems.

  2. 24 CFR 8.29 - Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self-help programs). 8.29 Section 8.29... URBAN DEVELOPMENT Program Accessibility § 8.29 Homeownership programs (sections 235(i) and...

  3. The scheduled squeeze on children's programs: tracking the implications of projected federal spending patterns.

    PubMed

    Steuerle, C Eugene; Isaacs, Julia B

    2014-12-01

    Federal programs for children are under increasing budgetary pressure. According to current federal law or any budget alternative being offered by the president or congressional leaders, spending on children would decline as a share of the budget and of the national economy. This article summarizes past, current, and projected budgets for children's programs. It traces significant historical expansions of means-tested programs, such as the Supplemental Nutrition Assistance Program; depicts fairly significant declines in more universal supports, such as the income tax exemption for dependents; and shows the future squeeze on children's programs brought about by automatic growth in health, retirement, and tax subsidy programs, along with the failure of revenues to keep pace with the overall growth in spending. Federal programs for health care have been a mixed blessing for children: Medicaid has grown to be the largest federal support for children, but overall federal health care costs eat away at the share of the budgetary pie left for anything else.

  4. Medicare program; schedule of limits on home health agency costs per visit for cost reporting periods beginning on or after July 1, 1989--HCFA. Final notice.

    PubMed

    1991-03-28

    This final notice sets forth a revised schedule of limits on home health agency costs that may be paid under the Medicare program. This revised schedule of limits applies to cost reporting periods beginning on or after July 1, 1989 and before July 1, 1991. As required by section 6222 of the Omnibus Budget Reconciliation Act of 1989 (Pub. L. 101-239), the revised schedule of limits incorporates the hospital wage index in effect for cost reporting periods beginning prior to July 1, 1989.

  5. Global Positioning System III (GPS III)

    DTIC Science & Technology

    2013-12-01

    Global Positioning System III ( GPS III) As of FY 2015 President’s Budget...00-00-2013 to 00-00-2013 4. TITLE AND SUBTITLE Global Positioning System III ( GPS III) 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT...Responsible Office References Program Name Global Positioning System III ( GPS III) DoD Component Air Force

  6. Tolerability of intensified intravenous interferon alfa-2b versus the ECOG 1684 schedule as adjuvant therapy for stage III melanoma: a randomized phase III Italian Melanoma Inter-group trial (IMI – Mel.A.) [ISRCTN75125874

    PubMed Central

    Chiarion-Sileni, Vanna; Del Bianco, Paola; Romanini, Antonella; Guida, Michele; Paccagnella, Adriano; Dalla Palma, Maurizio; Naglieri, Emanuele; Ridolfi, Ruggero; Silvestri, Barbara; Michiara, Maria; De Salvo, Gian Luca

    2006-01-01

    Background High-dose interferon alfa-2b (IFNalfa-2b), according to the ECOG 1684 schedule, is the only approved adjuvant treatment for stage III melanoma patients by the FDA and EMEA. However, the risk/benefit profile has been questioned limiting its world-wide use. In the late nineties, the Italian Melanoma Inter-group started a spontaneous randomized clinical trial (RCT) to verify if a more intense, but shorter than the ECOG 1684 regimen, could improve survival without increasing the toxicity profile. The safety analysis in the first 169 patients who completed the treatment is here described. Methods Stage III melanoma patients were randomized to receive IFNalfa-2b 20 MU/m2/d intravenously (IV) 5 days/week × 4 weeks, repeated for three times on weeks 9 to 12, 17 to 20, 25 to 28 (Dose-Dense/Dose-Intense, DD/DI, arm), or IFNalfa-2b 20 MU/m2/d IV 5 days/week × 4 weeks followed by 10 MU/m2 subcutaneously (SC) three times per week × 48 weeks (High Dose Interferon, HDI, arm). Toxicity was recorded and graded, according to the WHO criteria, as the worst grade that occurred during each cycle. Results The most common toxicities in both arms were flu-like and gastrointestinal symptoms, leukopenia, liver and neuro-psichiatric morbidities; with regard to severe toxicity, only leukopenia was statistically more frequent in DD/DI arm than in HDI arm (24% vs 9%) (p = 0.0074), yet, this did not cause an increase in the infection risk. Discontinuation of treatment, due to toxicity, was observed in 13 and 17% of the patients in the DD/DI and HDI arm, respectively. The median actual dose intensity delivered in the DD/DI arm (36.4 MU/m2/week) was statistically higher than that delivered in the HDI arm (30.7 MU/m2/week) (p = 0.003). Conclusion Four cycles of intravenous high-dose IFNalfa-2b can be safely delivered with an increase in the median dose intensity. Efficacy results from this trial are eagerly awaited. PMID:16504154

  7. Integrated Campaign Probabilistic Cost, Schedule, Performance, and Value for Program Office Support

    NASA Technical Reports Server (NTRS)

    Cornelius, David; Sasamoto, Washito; Daugherty, Kevin; Deacon, Shaun

    2012-01-01

    This paper describes an integrated assessment tool developed at NASA Langley Research Center that incorporates probabilistic analysis of life cycle cost, schedule, launch performance, on-orbit performance, and value across a series of planned space-based missions, or campaign. Originally designed as an aid in planning the execution of missions to accomplish the National Research Council 2007 Earth Science Decadal Survey, it utilizes Monte Carlo simulation of a series of space missions for assessment of resource requirements and expected return on investment. Interactions between simulated missions are incorporated, such as competition for launch site manifest, to capture unexpected and non-linear system behaviors. A novel value model is utilized to provide an assessment of the probabilistic return on investment. A demonstration case is discussed to illustrate the tool utility.

  8. Integrated Campaign Probabilistic Cost, Schedule, Performance, and Value for Program Office Support

    NASA Technical Reports Server (NTRS)

    Cornelius, David; Sasamoto, Washito; Daugherty, Kevin; Deacon, Shaun

    2012-01-01

    This paper describes an integrated assessment tool developed at NASA Langley Research Center that incorporates probabilistic analysis of life cycle cost, schedule, launch performance, on-orbit performance, and value across a series of planned space-based missions, or campaign. Originally designed as an aid in planning the execution of missions to accomplish the National Research Council 2007 Earth Science Decadal Survey, it utilizes Monte Carlo simulation of a series of space missions for assessment of resource requirements and expected return on investment. Interactions between simulated missions are incorporated, such as competition for launch site manifest, to capture unexpected and non-linear system behaviors. A novel value model is utilized to provide an assessment of the probabilistic return on investment. A demonstration case is discussed to illustrate the tool utility.

  9. Benefits of Centralized Scheduling in a Postacute Residential Rehabilitation Program for People With Acquired Brain Lesions: A Pilot Study.

    PubMed

    Vestri, Alec; Pizzighello, Silvia; Piccoli, Sara; Martinuzzi, Andrea

    2017-04-01

    To determine whether the use of a designated staff person to coordinate and schedule therapy services in a postacute residential rehabilitation program for people with acquired brain lesions results in (1) a higher-intensity treatment and a reduced length of stay; (2) reduced rehabilitation costs; and (3) increased patient and staff satisfaction. This nonrandomized retrospective study from 2009 through 2012 uses data collected relative to 2 different methods of scheduling: (1) self-planning, in which each single team member makes appointments that are then displayed on a shared board; and (2) managed planning, in which appointments are made by a designated staff person. A residential center for people with postacute acquired brain lesions. Patients (N=20) with acquired brain lesions who had similar clinical and demographic characteristics comprised the managed planning group (n=10) and the self-planning group (n=10). Not applicable. Organizational measures (length of stay in rehabilitation, number of treatment hours, total cost of rehabilitation), clinical outcome scales (Disability Rating Scale, FIM, and Barthel Index), perceived quality of treatment by patients (questionnaire), and perceived satisfaction of team members (Job Descriptive Index). All patients improved on all clinical rating scales at the time of discharge (all effect sizes are large). In the managed planning group, the number of treatment hours increased (Cohen's d=2.15), resulting in reduced length of stay (Cohen's d=.95) and cost of rehabilitation (Cohen's d=1.22). In addition, the quality of treatment perceived by the patients and their families increased, while team member satisfaction did not change. The use of a designated staff person to manage therapy services improves efficiency and efficacy of a patient-centered health care system. The proposed scheduling system results in a remarkable cost saving for the National Health System. Copyright © 2017 American Congress of Rehabilitation

  10. Alternatives in Scheduling Patterns: Practitioner Implementation of Minicourse Programs in Selected Midwestern High Schools.

    ERIC Educational Resources Information Center

    Hansen, Patricia; Guenther, John

    The purposes of the document are to report on the status of social studies minicourse programs in selected midwestern high schools and to provide information to schools regarding obstacles to minicourses as alternatives to traditional programs. A 1976-77 survey of 265 midwestern high schools determined that only 60 (23%) of the schools offered…

  11. Diffusing a research-based physical activity promotion program for seniors into diverse communities: CHAMPS III.

    PubMed

    Stewart, Anita L; Gillis, Dawn; Grossman, Melanie; Castrillo, Martha; Pruitt, Leslie; McLellan, Barbara; Sperber, Nina

    2006-04-01

    Increasing the physical activity levels of older adults through diffusion of successful research-based programs into community settings is challenging because of differences between research and real-world settings. This project diffused the Community Healthy Activities Model Program for Seniors (CHAMPS) II, an individual-level research-based physical activity promotion program, through three community organizations to reach lower-income and minority (primarily Hispanic or Latino and African American) seniors. Through an academic-community partnership, university staff worked with each organization to adapt the program to be appealing and effective, enable their staff and volunteers to provide the program, increase participants' physical activity, and leave sustainable programs in place. Evaluation was based on methods recommended by the Centers for Disease Control and Prevention. The adapted programs, referred to as CHAMPS III, differed from the original program and among organizations. Group-based components and resource guides were included and new features were added; however, individualized components were not offered because of limited resources. A total of 321 people enrolled among three organizations; there was a trend toward increased physical activity at two organizations (an estimated increase of 481 kcal/week [P = .08] and 437 kcal/week [P = .06] expended in physical activity). Evaluation revealed challenges and unexpected community-level benefits. All organizations are continuing efforts to promote physical activity for older adults. This project enabled community organizations to implement physical activity promotion programs. The overarching challenge was to retain original program features within each organization's resources yet be sustainable. Although the programs differed from the original research program, they were a catalyst for numerous community-level changes. Our findings can guide similar projects to reach underserved older adults.

  12. Phase III Program Study Report. Evaluation of the Child and Family Resource Program (CFRP).

    ERIC Educational Resources Information Center

    Johnson, Lynell; and Others

    Fourth in a series of Child and Family Resource Program (CFRP) evaluation reports, this document is devoted to the program study component, designed to illustrate CFRP operations across the country and to establish a descriptive context for statistical and analytic findings. Chapter 1 describes the process of building a network of linkages with…

  13. Navy Occupational Health Information Management System (NOHIMS). Medical Exam Scheduling Module. Program Maintenance Manual

    DTIC Science & Technology

    1987-06-01

    a one indicates that it is not 6-12 .0 " MAG: A pointer to an employee’s agency * MASB : A pointer to the asbestos program * MC: A count of an...V, PL K c, sun I- " MAG: A pointer to an agency " MAGE: An employee’s age " MASB : A pointer to the asbestos program * MCL: A Clinic file entry number...routine T2MRE3 uses the following variables: * Ml: An employee’s name as an index * MASB : A pointer to the asbestos program * MCO: The zero node of a

  14. 77 FR 43084 - Multiple Award Schedule (MAS) Program Continuous Open Season-Operational Change

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-23

    ... needs of the government, especially under these current fiscal challenges. Operational efficiencies and cost control thus realized will restore and maintain the MAS program's value to Federal agencies as...

  15. 15 CFR Schedule I to Part 700 - Approved Programs and Delegate Agencies

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... programs: A1 Aircraft Department of Defense. 1 A2 Missiles Do. A3 Ships Do. A4 Tank—Automotive Do. A5..., including law enforcement Do. N6 Chemical, biological, radiological, and nuclear countermeasures Do....

  16. DSN Scheduling Engine

    NASA Technical Reports Server (NTRS)

    Clement, Bradley; Johnston, Mark; Wax, Allan; Chouinard, Caroline

    2008-01-01

    The DSN (Deep Space Network) Scheduling Engine targets all space missions that use DSN services. It allows clients to issue scheduling, conflict identification, conflict resolution, and status requests in XML over a Java Message Service interface. The scheduling requests may include new requirements that represent a set of tracks to be scheduled under some constraints. This program uses a heuristic local search to schedule a variety of schedule requirements, and is being infused into the Service Scheduling Assembly, a mixed-initiative scheduling application. The engine resolves conflicting schedules of resource allocation according to a range of existing and possible requirement specifications, including optional antennas; start of track and track duration ranges; periodic tracks; locks on track start, duration, and allocated antenna; MSPA (multiple spacecraft per aperture); arraying/VLBI (very long baseline interferometry)/delta DOR (differential one-way ranging); continuous tracks; segmented tracks; gap-to-track ratio; and override or block-out of requirements. The scheduling models now include conflict identification for SOA(start of activity), BOT (beginning of track), RFI (radio frequency interference), and equipment constraints. This software will search through all possible allocations while providing a best-effort solution at any time. The engine reschedules to accommodate individual emergency tracks in 0.2 second, and emergency antenna downtime in 0.2 second. The software handles doubling of one mission's track requests over one week (to 42 total) in 2.7 seconds. Further tests will be performed in the context of actual schedules.

  17. An Approximation Solution to Refinery Crude Oil Scheduling Problem with Demand Uncertainty Using Joint Constrained Programming

    PubMed Central

    Duan, Qianqian; Yang, Genke; Xu, Guanglin; Pan, Changchun

    2014-01-01

    This paper is devoted to develop an approximation method for scheduling refinery crude oil operations by taking into consideration the demand uncertainty. In the stochastic model the demand uncertainty is modeled as random variables which follow a joint multivariate distribution with a specific correlation structure. Compared to deterministic models in existing works, the stochastic model can be more practical for optimizing crude oil operations. Using joint chance constraints, the demand uncertainty is treated by specifying proximity level on the satisfaction of product demands. However, the joint chance constraints usually hold strong nonlinearity and consequently, it is still hard to handle it directly. In this paper, an approximation method combines a relax-and-tight technique to approximately transform the joint chance constraints to a serial of parameterized linear constraints so that the complicated problem can be attacked iteratively. The basic idea behind this approach is to approximate, as much as possible, nonlinear constraints by a lot of easily handled linear constraints which will lead to a well balance between the problem complexity and tractability. Case studies are conducted to demonstrate the proposed methods. Results show that the operation cost can be reduced effectively compared with the case without considering the demand correlation. PMID:24757433

  18. An approximation solution to refinery crude oil scheduling problem with demand uncertainty using joint constrained programming.

    PubMed

    Duan, Qianqian; Yang, Genke; Xu, Guanglin; Pan, Changchun

    2014-01-01

    This paper is devoted to develop an approximation method for scheduling refinery crude oil operations by taking into consideration the demand uncertainty. In the stochastic model the demand uncertainty is modeled as random variables which follow a joint multivariate distribution with a specific correlation structure. Compared to deterministic models in existing works, the stochastic model can be more practical for optimizing crude oil operations. Using joint chance constraints, the demand uncertainty is treated by specifying proximity level on the satisfaction of product demands. However, the joint chance constraints usually hold strong nonlinearity and consequently, it is still hard to handle it directly. In this paper, an approximation method combines a relax-and-tight technique to approximately transform the joint chance constraints to a serial of parameterized linear constraints so that the complicated problem can be attacked iteratively. The basic idea behind this approach is to approximate, as much as possible, nonlinear constraints by a lot of easily handled linear constraints which will lead to a well balance between the problem complexity and tractability. Case studies are conducted to demonstrate the proposed methods. Results show that the operation cost can be reduced effectively compared with the case without considering the demand correlation.

  19. 77 FR 68891 - Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule, DME Face-to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-16

    ...This major final rule with comment period addresses changes to the physician fee schedule, payments for Part B drugs, and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. It also implements provisions of the Affordable Care Act by establishing a face-to-face encounter as a condition of payment for certain durable medical equipment (DME) items. In addition, it implements statutory changes regarding the termination of non-random prepayment review. This final rule with comment period also includes a discussion in the Supplementary Information regarding various programs . (See the Table of Contents for a listing of the specific issues addressed in this final rule with comment period.)

  20. Design and Evaluation of the User-Adapted Program Scheduling system based on Bayesian Network and Constraint Satisfaction

    NASA Astrophysics Data System (ADS)

    Iwasaki, Hirotoshi; Sega, Shinichiro; Hiraishi, Hironori; Mizoguchi, Fumio

    In recent years, lots of music content can be stored in mobile computing devices, such as a portable digital music player and a car navigation system. Moreover, various information content like news or traffic information can be acquired always anywhere by a cellular communication and a wireless LAN. However, usability issues arise from the simple interfaces of mobile computing devices. Moreover, retrieving and selecting such content poses safety issues, especially while driving. Thus, it is important for the mobile system to recommend content automatically adapted to user's preference and situation. In this paper, we present the user-adapted program scheduling that generates sequences of content (Program) suiting user's preference and situation based on the Bayesian network and the Constraint Satisfaction Problem (CSP) technique. We also describe the design and evaluation of its realization system, the Personal Program Producer (P3). First, preference such as a genre ratio of content in a program is learned as a Bayesian network model using simple operations such as a skip behavior. A model including each content tends to become large-scale. In order to make it small, we present the model separation method that carries out losslessly compression of the model. Using the model, probabilistic distributions of preference to generate constraints are inferred. Finally satisfying the constraints, a program is produced. This kind of CSP has an issue of which the number of variables is not fixedness. In order to make it variable, we propose a method using metavariables. To evaluate the above methods, we applied them to P3 on a car navigation system. User evaluations helped us clarify that the P3 can produce the program that a user prefers and adapt it to the user.

  1. ESEA, Title III Dissemination Program Evaluation Report, 1972-73, 1973-74. Sections I and II.

    ERIC Educational Resources Information Center

    Soper, Dorothy B.

    This report evaluates the New Jersey ESEA Title III dissemination program during its first two years, 1972-74. Purposes of the program are to (a) determine if essential elements of successful education programs can be transferred from originating districts to adopter districts while yielding comparable student gains, and (b) provide educators with…

  2. 40 CFR 147.2650 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CONTROL PROGRAMS Puerto Rico § 147.2650 State-administered program—Class I, II, III, IV, and V wells. The Underground Injection Control Program for all classes of wells in the Commonwealth of Puerto Rico, other than those on Indian lands, is the program administered by Puerto Rico's Environmental Quality Board (EQB...

  3. 40 CFR 147.2650 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CONTROL PROGRAMS Puerto Rico § 147.2650 State-administered program—Class I, II, III, IV, and V wells. The Underground Injection Control Program for all classes of wells in the Commonwealth of Puerto Rico, other than those on Indian lands, is the program administered by Puerto Rico's Environmental Quality Board (EQB...

  4. 40 CFR 147.2650 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CONTROL PROGRAMS Puerto Rico § 147.2650 State-administered program—Class I, II, III, IV, and V wells. The Underground Injection Control Program for all classes of wells in the Commonwealth of Puerto Rico, other than those on Indian lands, is the program administered by Puerto Rico's Environmental Quality Board (EQB...

  5. 40 CFR 147.2650 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CONTROL PROGRAMS Puerto Rico § 147.2650 State-administered program—Class I, II, III, IV, and V wells. The Underground Injection Control Program for all classes of wells in the Commonwealth of Puerto Rico, other than those on Indian lands, is the program administered by Puerto Rico's Environmental Quality Board (EQB...

  6. 40 CFR 147.2550 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 23 2014-07-01 2014-07-01 false State-administered program-Class I, III, IV and V wells. 147.2550 Section 147.2550 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS Wyoming §...

  7. Epstein-Barr virus growth/latency III program alters cellular microRNA expression

    SciTech Connect

    Cameron, Jennifer E. Fewell, Claire Yin, Qinyan McBride, Jane Wang Xia Lin Zhen

    2008-12-20

    The Epstein-Barr virus (EBV) is associated with lymphoid and epithelial cancers. Initial EBV infection alters lymphocyte gene expression, inducing cellular proliferation and differentiation as the virus transitions through consecutive latency transcription programs. Cellular microRNAs (miRNAs) are important regulators of signaling pathways and are implicated in carcinogenesis. The extent to which EBV exploits cellular miRNAs is unknown. Using micro-array analysis and quantitative PCR, we demonstrate differential expression of cellular miRNAs in type III versus type I EBV latency including elevated expression of miR-21, miR-23a, miR-24, miR-27a, miR-34a, miR-146a and b, and miR-155. In contrast, miR-28 expression was found to be lower in type III latency. The EBV-mediated regulation of cellular miRNAs may contribute to EBV signaling and associated cancers.

  8. G-III Precision Autopilot Development in Support of UAVSAR Program

    NASA Technical Reports Server (NTRS)

    Lee, James; Strovers, Brian; Lin, Victor

    2007-01-01

    This viewgraph presentation reviews NASA Dryden's role in the UAVSAR Program. The primary objective of the UAVSAR Project is to develop a miniaturized polarimetric L-band synthetic aperture radar (SAR) for use on an unmanned aerial vehicle (UAV) or minimally piloted vehicle. Dryden's work in developing the Platform Precision Autopilot (PPA) capability is described in this presentation. The goal for the development is that the PPA shall fly the G-III within a 10 m (32.8 ft) diameter tube for at least 90% of each data take in conditions of calm to light atmospheric disturbances, as defined. The G-III aircraft is descrbed, the test plan is outlined, and the initial test results are reviewed.

  9. G-III Precision Autopilot Development in Support of UAVSAR Program

    NASA Technical Reports Server (NTRS)

    Lee, James

    2007-01-01

    The primary objective of the UAVSAR Project is to develop a miniaturized polarimetric L-band synthetic aperture radar (SAR) for use on an unmanned aerial vehicle (UAV) or minimally piloted vehicle. This viewgraph presentation reviews NASA Dryden's role in the UAVSAR program. The G-III aircraft is described and shown, as well as a high level system architecture. The goals of the Platform Precision Autopilot (PPA) that it are shall fly the G-III within a 10 m (32.8 ft) diameter tube for at least 90% of each data take in conditions of calm to light atmospheric disturbances, as defined in MIL-STD-1797. That it minimize motion during data collection. It is critical to operate the UAVSAR System on a steady platform.

  10. G-III Precision Autopilot Development in Support of UAVSAR Program

    NASA Technical Reports Server (NTRS)

    Lee, James; Strovers, Brian; Lin, Victor

    2007-01-01

    This viewgraph presentation reviews NASA Dryden's role in the UAVSAR Program. The primary objective of the UAVSAR Project is to develop a miniaturized polarimetric L-band synthetic aperture radar (SAR) for use on an unmanned aerial vehicle (UAV) or minimally piloted vehicle. Dryden's work in developing the Platform Precision Autopilot (PPA) capability is described in this presentation. The goal for the development is that the PPA shall fly the G-III within a 10 m (32.8 ft) diameter tube for at least 90% of each data take in conditions of calm to light atmospheric disturbances, as defined. The G-III aircraft is descrbed, the test plan is outlined, and the initial test results are reviewed.

  11. Phase III Technology for All Americans Project: Creating Assessment, Professional Development, and Program Standards for Technological Literacy.

    ERIC Educational Resources Information Center

    Dugger, William E., Jr.

    2001-01-01

    The goals of Phase III of the Technology for All Americans Project are to develop student assessment standards, professional development standards, program standards, and effective leaders. The project is based on the Standards for Technology Literacy, a NASA initiative. (JOW)

  12. New Round of Studies Begin in Phase 0/I/II Cancer Prevention Clinical Trials Program | Division of Cancer Prevention

    Cancer.gov

    The NCI Division of Cancer Prevention’s Phase 0/I/II Cancer Prevention Clinical Trials Program, also known as the Consortia for Early Phase Prevention Trials, is beginning a new round of studies in the effort toward systematic early clinical development of promising preventive agents for people at increased risk of developing cancer. Infographic Highlight New Round of Studies Begin in Phase 0/I/II Cancer Prevention Clinical Trials Program |

  13. Graduate Program Scheduling Gains Flexibility through Container Courses: A Case Study

    ERIC Educational Resources Information Center

    Rose, Richard

    2011-01-01

    Online course delivery makes possible one innovation which can provide each student with greater program flexibility as well as some personal ownership of the direction and pace of his degree progress. This concept can be called the "container course." A container course is the offering of more than one course simultaneously under a single course…

  14. Baltimore Metropolitan Area Library Study, Short Range Work Program: Tasks, Schedule, and Methods.

    ERIC Educational Resources Information Center

    CONSAD Research Corp., Pittsburgh, PA.

    Described is a six-month work program, financed with Library Service and Construction Act funds, which applies systems analysis to public library organization, services, and facilities. The three public library systems of Baltimore City (Enoch Pratt Free Library), Baltimore County, and Anne Arundel County, Maryland are to be studied. Investigated…

  15. 76 FR 5830 - FBI Records Management Division; National Name Check Program Section; New User Fees Schedule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-02

    ... Program for noncriminal justice purposes. The total resource costs associated with providing these name... other applicable Federal law. The fee study identified all direct and indirect costs associated with the... the NNCP to determine the current cost of processing name checks for noncriminal justice purposes and...

  16. Graduate Program Scheduling Gains Flexibility through Container Courses: A Case Study

    ERIC Educational Resources Information Center

    Rose, Richard

    2011-01-01

    Online course delivery makes possible one innovation which can provide each student with greater program flexibility as well as some personal ownership of the direction and pace of his degree progress. This concept can be called the "container course." A container course is the offering of more than one course simultaneously under a single course…

  17. Regional Office Procedures. Stage I Final Report for the Study of Program Management Procedures in the Campus-Based and Basic Grant Programs. (Volume III).

    ERIC Educational Resources Information Center

    Puma, Michael J.

    Volume III of a study of program management procedures in the campus-based and Basic Educational Opportunity Grant (BEOG) programs provides a description of procedures employed within the U.S. Office of Education regional offices to administer the Basic Grant and campus-based student financial assistance programs. The objective of the report is to…

  18. Phase I/II Study Evaluating Early Tolerance in Breast Cancer Patients Undergoing Accelerated Partial Breast Irradiation Treated With the MammoSite Balloon Breast Brachytherapy Catheter Using a 2-Day Dose Schedule

    SciTech Connect

    Wallace, Michelle; Martinez, Alvaro; Mitchell, Christina; Chen, Peter Y.; Ghilezan, Mihai; Benitez, Pamela; Brown, Eric; Vicini, Frank

    2010-06-01

    Purpose: Initial Phase I/II results using balloon brachytherapy to deliver accelerated partial breast irradiation (APBI) in 2 days in patients with early-stage breast cancer are presented. Materials and Methods: Between March 2004 and August 2007, 45 patients received adjuvant radiation therapy after lumpectomy with balloon brachytherapy in a Phase I/II trial delivering 2800 cGy in four fractions of 700 cGy. Toxicities were evaluated using the National Cancer Institute Common Toxicity Criteria for Adverse Events v3.0 scale and cosmesis was documented at >=6 months. Results: The median age was 66 years (range, 48-83) and median skin spacing was 12 mm (range, 8-24). The median follow-up was 11.4 months (5.4-48 months) with 21 patients (47%) followed >=1 year, 11 (24%) >=2 years, and 7 (16%) >=3 years. At <6 months (n = 45), Grade II toxicity rates were 9% radiation dermatitis, 13% breast pain, 2% edema, and 2% hyperpigmentation. Grade III breast pain was reported in 13% (n = 6). At >=6 months (n = 43), Grade II toxicity rates were: 2% radiation dermatitis, 2% induration, and 2% hypopigmentation. Grade III breast pain was reported in 2%. Infection was 13% (n = 6) at <6 months and 5% (n = 2) at >=6 months. Persistent seroma >=6 months was 30% (n = 13). Fat necrosis developed in 4 cases (2 symptomatic). Rib fractures were seen in 4% (n = 2). Cosmesis was good/excellent in 96% of cases. Conclusions: Treatment with balloon brachytherapy using a 2-day dose schedule resulted acceptable rates of Grade II/III chronic toxicity rates and similar cosmetic results observed with a standard 5-day accelerated partial breast irradiation schedule.

  19. Energy Engineering Analysis Program. Energy savings opportunity survey, Fort Huachuca, Arizona. Volume III, programming documents

    SciTech Connect

    1994-12-31

    Insulation is considered for selected buildings. Energy savings are evaluated using energy simulations employing the Carrier HAP program. Weather data is only available for large cities. El Paso Texas was selected as the closest city with a somewhat similar climate; results are adjusted based on Fort Huachuca and El Paso meteorological data.

  20. A Visual Programming Methodology for Tactical Aircrew Scheduling and Other Applications

    DTIC Science & Technology

    1991-12-01

    environment, among other reasons. Our second porting attempt used the popular and powerful Tubo C compiler. We made progress using C, but development...the approach chosen by many neural net pror ja . It is not costly to either type of programmer to use this approach, and the data that turns out to be... neural network simulation, ou many comments made apply to object-oriented programming in general. 90 On Object-Oriented is elucidating the system, and

  1. Program for the Improvement of Downhole Drilling-Motor Bearings and Seals. Phase III, Part 2: final report

    SciTech Connect

    Not Available

    1980-03-01

    Six months of activity to improve downhole drilling-motor bearings and seals for geothermal applications are reported. The following are covered: seal testing and evaluation, bearing-seal package testing and evaluation, lubricant testing and evaluation, and program status, plans and schedule. (MHR)

  2. Registration Review Schedules

    EPA Pesticide Factsheets

    This schedule indicates plans for completion of risk assessments, proposed interim decisions and interim decisions for pesticides in the Registration Review program, EPA reviews all registered pesticides at least every 15 years as required by FIFRA.

  3. Optimally Scheduling Instructors at the Defense Language Institute: An Integer Programming Approach

    DTIC Science & Technology

    1993-09-01

    Instructor year total cannot exceed a maximum. OSI2 helps minimize the amount of turbulence in instructor year totals from year to year. It is needed since...DATA: STACKITk = value of starting s section(s) of course i in week t; TMAXY = one half of the instructor year total for year y (output from OSI2 ...planes, the remaining two sections would be encouraged to have some X3N= 2/3 in the linear programming relaxation. Unlike OSI, and OSI2 the number of

  4. Moral Education. Options in Education, Transcript for Program Scheduled for Broadcast the Week of September 13 [1976], Program No. 44.

    ERIC Educational Resources Information Center

    George Washington Univ., Washington, DC. Inst. for Educational Leadership.

    Teaching about moral issues is discussed in this transcript of "Options in Education," an electronic weekly magazine. Directed toward educators and students, the program covers news, features, policy, and people in the field of education and is available for broadcasting to member stations of National Public Radio. Seventeen montages…

  5. Moral Education. Options in Education, Transcript for Program Scheduled for Broadcast the Week of September 13 [1976], Program No. 44.

    ERIC Educational Resources Information Center

    George Washington Univ., Washington, DC. Inst. for Educational Leadership.

    Teaching about moral issues is discussed in this transcript of "Options in Education," an electronic weekly magazine. Directed toward educators and students, the program covers news, features, policy, and people in the field of education and is available for broadcasting to member stations of National Public Radio. Seventeen montages…

  6. 2012 Gordon Research Conference on Bioinspired Materials - Formal Schedule and Speaker/Poster Program

    SciTech Connect

    Chilkoti, Ashutosk

    2012-06-29

    The emerging, interdisciplinary field of Bioinspired Materials focuses on developing a fundamental understanding of the synthesis, directed self-assembly and hierarchical organization of natural occurring materials, and uses this understanding to engineer new bioinspired artificial materials for diverse applications. The inaugural 2012 Gordon Conference on Bioinspired Materials seeks to capture the excitement of this burgeoning field by a cutting-edge scientific program and roster of distinguished invited speakers and discussion leaders who will address the key issues in the field. The Conference will feature a wide range of topics, such as materials and devices from DNA, reprogramming the genetic code for design of new materials, peptide, protein and carbohydrate based materials, biomimetic systems, complexity in self-assembly, and biomedical applications of bioinspired materials.

  7. 40 CFR 147.200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... program for Class I, III, IV and V wells in the State of Arkansas, except those wells on Indian lands, is the program administered by the Arkansas Department of Pollution Control and Ecology approved by EPA... on June 25, 1984. (1) Arkansas Water and Air Pollution Control Act, Act 472 of 1949 as amended...

  8. 40 CFR 147.200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... program for Class I, III, IV and V wells in the State of Arkansas, except those wells on Indian lands, is the program administered by the Arkansas Department of Pollution Control and Ecology approved by EPA... on June 25, 1984. (1) Arkansas Water and Air Pollution Control Act, Act 472 of 1949 as amended...

  9. Round Robin Schedules.

    ERIC Educational Resources Information Center

    Iannone, Michael A.

    1983-01-01

    Presented is a computer program written in BASIC that covers round-robin schedules for team matches in competitions. The program was originally created to help teams in a tennis league play one match against every other team. Part of the creation of the program involved use of modulo arithmetic. (MP)

  10. Optimal piecewise linear schedules for LSGP- and LPGS-decomposed array processors via quadratic programming

    NASA Astrophysics Data System (ADS)

    Zimmermann, Karl-Heinz; Achtziger, Wolfgang

    2001-09-01

    The size of a systolic array synthesized from a uniform recurrence equation, whose computations are mapped by a linear function to the processors, matches the problem size. In practice, however, there exist several limiting factors on the array size. There are two dual schemes available to derive arrays of smaller size from large-size systolic arrays based on the partitioning of the large-size arrays into subarrays. In LSGP, the subarrays are clustered one-to-one into the processors of a small-size array, while in LPGS, the subarrays are serially assigned to a reduced-size array. In this paper, we propose a common methodology for both LSGP and LPGS based on polyhedral partitionings of large-size k-dimensional systolic arrays which are synthesized from n-dimensional uniform recurrences by linear mappings for allocation and timing. In particular, we address the optimization problem of finding optimal piecewise linear timing functions for small-size arrays. These are mappings composed of linear timing functions for the computations of the subarrays. We study a continuous approximation of this problem by passing from piecewise linear to piecewise quasi-linear timing functions. The resultant problem formulation is then a quadratic programming problem which can be solved by standard algorithms for nonlinear optimization problems.

  11. Surprise Benefits of Arena Scheduling

    ERIC Educational Resources Information Center

    Surloff, Andrew

    2008-01-01

    One of the most challenging tasks a principal must accomplish every year is the construction of the master schedule. Free from the magnetic scheduling boards and wall charts of yesteryear, principals now have technological tools--such as programs that offer schools solutions for their scheduling needs--that can save time and enable them to work…

  12. Rural Inservice Using Alternate Scheduling.

    ERIC Educational Resources Information Center

    Kimmet, James L.

    Three small rural school districts in Montana and Wyoming used alternate school day scheduling to make time for staff and curriculum development inservice programs. The schedule of one short and four long days delivered the instructional time of 175 6-hour days each year. Benefits of alternate scheduling included time for regular inservice…

  13. Surprise Benefits of Arena Scheduling

    ERIC Educational Resources Information Center

    Surloff, Andrew

    2008-01-01

    One of the most challenging tasks a principal must accomplish every year is the construction of the master schedule. Free from the magnetic scheduling boards and wall charts of yesteryear, principals now have technological tools--such as programs that offer schools solutions for their scheduling needs--that can save time and enable them to work…

  14. Update on the National Cholesterol Education Program Adult Treatment Panel III guidelines: getting to goal.

    PubMed

    McKenney, James M

    2003-09-01

    Considerable data on the pathophysiology, epidemiology, and treatment of dyslipidemia-induced coronary heart disease (CHD) have accumulated in recent years. These data have been assessed and incorporated into the guidelines of the National Cholesterol Education Program Expert Panel on the Detection, Evaluation, and Treatment of High Blood Cholesterol in Adults (Adult Treatment Panel [ATP] III). A major focus of the new guidelines is the assessment of the near-term (i.e., 10-yr) risk of experiencing a CHD event and matching the intensity of treatment to this risk. Patients with diabetes and those with a greater than 20% 10-year risk of experiencing a CHD event have been elevated to the risk level of CHD equivalent. The ATP III guidelines also modify several lipid and lipoprotein classifications. A low-density lipoprotein cholesterol (LDL) level below 100 mg/dl is now considered optimum for all individuals. In addition, high-density lipoprotein cholesterol (HDL) and triglyceride cutoff points have been modified to reflect more accurately the risk associated with abnormalities in these lipoproteins. As with the previous guidelines, the primary target of therapy remains LDL. Therapeutic lifestyle changes consisting of diet, weight reduction, and increased physical activity should be included in all treatment regimens. Based on their potent LDL-lowering properties and their proven ability to decrease mortality in a variety of patient populations, statins are generally the first choice for pharmacologic therapy. A secondary target of therapy includes non-HDL goals for patients with high triglyceride levels and the metabolic syndrome, which is characterized by abdominal obesity, elevated triglyceride levels, low HDL levels, and insulin resistance. Management of these secondary targets includes weight reduction and increased physical activity, and treatment of the lipid and nonlipid risk factors. Overall, ATP III represents an aggressive approach to treating dyslipidemia

  15. Medicare program; schedule of limits on home health agency costs per visit--HCFA. Notice with comment period.

    PubMed

    1995-02-14

    This notice with comment period sets forth a revised schedule of limits on home health agency costs that may be paid under the Medicare program for cost reporting periods beginning on or after July 1, 1993. These limits replace the per-visit limits that were set forth in our July 8, 1993 notice with comment period (58 FR 36748). This notice also provides, in accordance with the provisions of the Omnibus Budget Reconciliation Act of 1993 (OBRA '93), that there will be no changes in the home health agency (HHA) cost limits for cost reporting periods beginning on or after July 1, 1994, and before July 1, 1996. In addition, this notice responds to public comments on the July 8, 1993 notice with comment period, which originally set forth the HHA cost limits for cost reporting periods beginning on or after July 1, 1993, and on the January 6, 1994 notice with comment period (59 FR 760), which announced the elimination of the hospital based add-on effective for cost reporting periods beginning on or after October 1, 1993.

  16. User’s guide to SNAP for ArcGIS® :ArcGIS interface for scheduling and network analysis program

    Treesearch

    Woodam Chung; Dennis Dykstra; Fred Bower; Stephen O’Brien; Richard Abt; John. and Sessions

    2012-01-01

    This document introduces a computer software named SNAP for ArcGIS® , which has been developed to streamline scheduling and transportation planning for timber harvest areas. Using modern optimization techniques, it can be used to spatially schedule timber harvest with consideration of harvesting costs, multiple products, alternative...

  17. Medicare program; replacement of reasonable charge methodology by fee schedules for parenteral and enteral nutrients, equipment, and supplies. Final rule.

    PubMed

    2001-08-28

    This final rule implements fee schedules for payment of parenteral and enteral nutrition (PEN) items and services furnished under the prosthetic device benefit, defined in section 1861(s)(8) of the Social Security Act. The authority for establishing these fee schedules is provided by the Balanced Budget Act of 1997, which amended the Social Security Act at section 1842(s). Section 1842(s) of the Social Security Act specifies that statewide or other area wide fee schedules may be implemented for the following items and services still subject to the reasonable charge payment methodology: medical supplies; home dialysis supplies and equipment; therapeutic shoes; parenteral and enteral nutrients, equipment, and supplies; electromyogram devices; salivation devices; blood products; and transfusion medicine. This final rule describes changes made to the proposed fee schedule payment methodology for these items and services and provides that the fee schedules for PEN items and services are effective for all covered items and services furnished on or after January 1, 2002. Fee schedules will not be implemented for electromyogram devices and salivation devices at this time since these items are not covered by Medicare. In addition, fee schedules will not be implemented for medical supplies, home dialysis supplies and equipment, therapeutic shoes, blood products, and transfusion medicine at this time since the data required to establish these fee schedules are inadequate.

  18. A Study of the Education Professions Development Act Training Programs for Higher Education Personnel, Volume III: The EPDA V-E Training Programs. Final Report.

    ERIC Educational Resources Information Center

    Boyle, E.; Carlson, K.

    Volume III of a study of the Education Professions Development Act (EPDA) training programs for higher education personnel presents the second of a three-faceted approach to assess current needs. This document reviews the task of profiling EPDA V-E training programs to produce a small-scale information system. Section one reviews the profiling…

  19. NASA Schedule Management Handbook

    NASA Technical Reports Server (NTRS)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  20. Computerized Schedule Effectiveness Technique /SET/ determines present and future schedule position

    NASA Technical Reports Server (NTRS)

    Ballard, D.; Birdsong, J.; Calva, R.

    1967-01-01

    Computerized scheduling system calculates an index of overall schedule-effectiveness. The schedule-effectiveness index is a measurement of actual overall performance against the existing schedule, and a series of schedule-effectiveness values indicates the trend of actual performance. This computer program is written in Fortran 4.

  1. 40 CFR 52.1677 - Compliance schedules.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... sections 223.1(a), 225.3(c), and 230.2(d) of Subchapter A, Chapter III, Title 6 of New York State's... schedule for any source to which the application of the compliance schedule in paragraphs (d)(2), (3), (5... been submitted for every source for which they are required. (d) Federal compliance schedules. (1) The...

  2. Mapping of Primary Instructional Methods and Teaching Techniques for Regularly Scheduled, Formal Teaching Sessions in an Anesthesia Residency Program.

    PubMed

    Vested Madsen, Matias; Macario, Alex; Yamamoto, Satoshi; Tanaka, Pedro

    2016-06-01

    In this study, we examined the regularly scheduled, formal teaching sessions in a single anesthesiology residency program to (1) map the most common primary instructional methods, (2) map the use of 10 known teaching techniques, and (3) assess if residents scored sessions that incorporated active learning as higher quality than sessions with little or no verbal interaction between teacher and learner. A modified Delphi process was used to identify useful teaching techniques. A representative sample of each of the formal teaching session types was mapped, and residents anonymously completed a 5-question written survey rating the session. The most common primary instructional methods were computer slides-based classroom lectures (66%), workshops (15%), simulations (5%), and journal club (5%). The number of teaching techniques used per formal teaching session averaged 5.31 (SD, 1.92; median, 5; range, 0-9). Clinical applicability (85%) and attention grabbers (85%) were the 2 most common teaching techniques. Thirty-eight percent of the sessions defined learning objectives, and one-third of sessions engaged in active learning. The overall survey response rate equaled 42%, and passive sessions had a mean score of 8.44 (range, 5-10; median, 9; SD, 1.2) compared with a mean score of 8.63 (range, 5-10; median, 9; SD, 1.1) for active sessions (P = 0.63). Slides-based classroom lectures were the most common instructional method, and faculty used an average of 5 known teaching techniques per formal teaching session. The overall education scores of the sessions as rated by the residents were high.

  3. Medicare program; schedule of limits on home health agency costs per visit for cost reporting periods beginning on or after July 1, 1997--HCFA. Notice with comment period.

    PubMed

    1997-07-01

    This notice sets fort a revised schedule of limits on home health agency costs that may be paid under the Medicare program for cost reporting periods beginning on or after July 1, 1997. These limits replace the per visit limits that were set forth in our July 1, 1996 notice with comment period (61 FR 34344). This notice also responds to comments on the July 1, 1996 notice.

  4. Scheduling Supercomputers.

    DTIC Science & Technology

    1983-02-01

    no task is scheduled with overlap. Let numpi be the total number of preemptions and idle slots of size at most to that are introduced. We see that if...no usable block remains on Qm-*, then numpi < m-k. Otherwise, numpi ! m-k-1. If j>n when this procedure terminates, then all tasks have been scheduled

  5. Composite Scheduling

    ERIC Educational Resources Information Center

    Childers, Gary L.; Ireland, Rebecca Weeks

    2005-01-01

    In education, there is no one best way to do anything. There are compelling reasons why some courses should be taught in longer segments of time, which the block schedule provides. There are also compelling reasons why some classes should be taught in shorter segments. At Watauga High School in Boone, North Carolina, an alternative schedule that…

  6. Scheduling game

    SciTech Connect

    Kleck, W

    1982-04-01

    Structuring a schedule - whether by Critical Path Method (CPM) or Precedence Charting System (PCS) - involves estimating the duration of one or more activities and arranging them in the most logical sequence. Given the start date, the completion date is relatively simple to determine. What is then so complicated about the process. It is complicated by the people involved - the people who make the schedules and the people who attempt to follow them. Schedules are an essential part of project management and construction contract administration. Much of the material available pertains to the mechanics of schedules, the types of logic networks, the ways that data can be generated and presented. This paper sheds light on other facets of the subject - the statistical and philosophical fundamentals involved in scheduling.

  7. The Teacher Aide Program. ESEA, Title III--Social Studies In-Service Model Project Bulletin 3.

    ERIC Educational Resources Information Center

    Madison Public Schools, WI.

    The Teacher Aide Program--one aspect of a 1967-68 Title III ESEA project to implement a pilot social studies program in various Madison, Wisconsin, public schools--utilized 1 full-time or 2 part-time noncertified aides working with each of 4 project teaching teams (horizontal teams at grades 6 and 10, and vertical teams at grades 4, 5, 6, and 8,…

  8. DOD Operational Testing: Oversight Has Resulted in Few Significant Disputes and Limited Program Cost and Schedule Increases

    DTIC Science & Technology

    2015-06-01

    the scope of operational testing and better understanding of system requirements. Resolution of disputes for three programs—DDG-51 Flight III ...for three programs—DDG-51 Flight III Destroyer, F-35 Joint A Variety of Factors Contributed to Disputes We Reviewed, but Only a Few Cases Had...Ford Class Aircraft Carrier X DDG-51 Flight III Destroyer / AN/SPY-6 Radar / Aegis Modernization X DOD Automated Biometrics Identification

  9. 40 CFR 147.251 - EPA-administered program-Class I, III, IV and V wells and Indian lands.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... INJECTION CONTROL PROGRAMS California § 147.251 EPA-administered program—Class I, III, IV and V wells and... remainder of this subpart. Injection well owners and operators, and EPA shall comply with these requirements..., IV and V wells and Indian lands. 147.251 Section 147.251 Protection of Environment ENVIRONMENTAL...

  10. 40 CFR 147.251 - EPA-administered program-Class I, III, IV and V wells and Indian lands.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... INJECTION CONTROL PROGRAMS California § 147.251 EPA-administered program—Class I, III, IV and V wells and... remainder of this subpart. Injection well owners and operators, and EPA shall comply with these requirements..., IV and V wells and Indian lands. 147.251 Section 147.251 Protection of Environment ENVIRONMENTAL...

  11. 40 CFR 147.251 - EPA-administered program-Class I, III, IV and V wells and Indian lands.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... INJECTION CONTROL PROGRAMS California § 147.251 EPA-administered program—Class I, III, IV and V wells and... remainder of this subpart. Injection well owners and operators, and EPA shall comply with these requirements..., IV and V wells and Indian lands. 147.251 Section 147.251 Protection of Environment ENVIRONMENTAL...

  12. 40 CFR 147.251 - EPA-administered program-Class I, III, IV and V wells and Indian lands.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... INJECTION CONTROL PROGRAMS California § 147.251 EPA-administered program—Class I, III, IV and V wells and... remainder of this subpart. Injection well owners and operators, and EPA shall comply with these requirements..., IV and V wells and Indian lands. 147.251 Section 147.251 Protection of Environment ENVIRONMENTAL...

  13. Committee of the Undergraduate Program in Mathematics Geometry Conference, Part III: Geometric Transformation Groups and Other Topics.

    ERIC Educational Resources Information Center

    Durst, Lincoln K., Ed.

    This is Part III of the first volume of the proceedings of the Committee on the Undergraduate Program in Mathematics (CUPM) Geometry Conference, held at Santa Barbara in June, 1967. The purpose of the conference was to consider the status of geometry in colleges at the undergraduate level. The conference, attended by undergraduate mathematics…

  14. 40 CFR 147.1751 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Environmental Law Enforcement Act of 1975, North Dakota Century Code Sections 32-40-01 to 32-40-11 (1976); (2..., III, IV and V wells. 147.1751 Section 147.1751 Protection of Environment ENVIRONMENTAL PROTECTION... Control Program) (1984); (b) Other laws. The following statutes and regulations, although not...

  15. 40 CFR 147.1751 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Environmental Law Enforcement Act of 1975, North Dakota Century Code Sections 32-40-01 to 32-40-11 (1976); (2..., III, IV and V wells. 147.1751 Section 147.1751 Protection of Environment ENVIRONMENTAL PROTECTION... Control Program) (1984); (b) Other laws. The following statutes and regulations, although not...

  16. 40 CFR 147.1751 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Environmental Law Enforcement Act of 1975, North Dakota Century Code Sections 32-40-01 to 32-40-11 (1976); (2..., III, IV and V wells. 147.1751 Section 147.1751 Protection of Environment ENVIRONMENTAL PROTECTION... Control Program) (1984); (b) Other laws. The following statutes and regulations, although not...

  17. 40 CFR 147.1751 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Environmental Law Enforcement Act of 1975, North Dakota Century Code Sections 32-40-01 to 32-40-11 (1976); (2..., III, IV and V wells. 147.1751 Section 147.1751 Protection of Environment ENVIRONMENTAL PROTECTION... Control Program) (1984); (b) Other laws. The following statutes and regulations, although not...

  18. A Sequenced Instructional Program in Physical Education for the Handicapped, Phase III. Producing and Disseminating Demonstration Packages. Final Report.

    ERIC Educational Resources Information Center

    Carr, Dorothy B.; Avance, Lyonel D.

    Presented is a sequenced instructional program in physical education which constitutes the third of a three-phase, 4-year project, funded by Title III, for handicapped children, preschool through high school levels, in the Los Angeles Unified School District. Described are the project setting and the following accomplishments: a curriculum guide…

  19. 40 CFR 147.51 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Class I, III, IV and V wells in the State of Alabama, except those on Indian lands, is the program... Water Pollution Control Act, Code of Alabama 1975, sections 22-22-1 through 22-22-14 (1980 and Supp... the EPA Regional Administrator on May 24, 1983. (c) Statement of legal authority. (1) “Water Pollution...

  20. Medicare program; schedule of limits on home health agency costs per visit for cost reporting periods beginning on or after July 1, 1988. HCFA--Notice with comment period.

    PubMed

    1988-10-18

    This final notice with comment period sets forth an updated schedule of limits on home health agency (HHA) costs that may be reimbursed under the Medicare program. This updated schedule of limits applies to cost reporting periods beginning on or after July 1, 1988.

  1. A computer program (HEVSIM) for heavy duty vehicle fuel economy and performance simulation. Volume III: Appendices A through F. Final report Mar-Oct 80

    SciTech Connect

    Buck, R.E.

    1981-09-01

    Volume III is the third and last volume of a three volume document describing the computer program HEVSIM. This volume includes appendices which list the HEVSIM program, sample part data, some typical outputs and updated nomenclature.

  2. Role of class III phosphatidylinositol 3-kinase during programmed nuclear death of Tetrahymena thermophila.

    PubMed

    Akematsu, Takahiko; Fukuda, Yasuhiro; Attiq, Rizwan; Pearlman, Ronald E

    2014-02-01

    Programmed nuclear death (PND) in the ciliate protozoan Tetrahymena thermophila is a novel type of autophagy that occurs during conjugation, in which only the parental somatic macronucleus is destined to die and is then eliminated from the progeny cytoplasm. Other coexisting nuclei, however, such as new micro- and macronuclei are unaffected. PND starts with condensation in the nucleus followed by apoptotic DNA fragmentation, lysosomal acidification, and final resorption. Because of the peculiarity in the process and the absence of some ATG genes in this organism, the mechanism of PND has remained unclear. In this study, we focus on the role of class III phosphatidylinositol 3-kinase (PtdIns3K, corresponding to yeast Vps34) in order to identify central regulators of PND. We identified the sole Tetrahymena thermophila ortholog (TtVPS34) to yeast Vps34 and human PIK3C3 (the catalytic subunit of PtdIns3K), through phylogenetic analysis, and generated the gene knockdown mutant for functional analysis. Loss of TtVPS34 activity prevents autophagosome formation on the parental macronucleus, and this nucleus escapes from the lysosomal pathway. In turn, DNA fragmentation and final resorption of the nucleus are drastically impaired. These phenotypes are similar to the situation in the ATG8Δ mutants of Tetrahymena, implying an inextricable link between TtVPS34 and TtATG8s in controlling PND as well as general macroautophagy. On the other hand, TtVPS34 does not appear responsible for the nuclear condensation and does not affect the progeny nuclear development. These results demonstrate that TtVPS34 is critically involved in the nuclear degradation events of PND in autophagosome formation rather than with an involvement in commitment to the death program.

  3. Role of class III phosphatidylinositol 3-kinase during programmed nuclear death of Tetrahymena thermophila

    PubMed Central

    Akematsu, Takahiko; Fukuda, Yasuhiro; Attiq, Rizwan; Pearlman, Ronald E

    2014-01-01

    Programmed nuclear death (PND) in the ciliate protozoan Tetrahymena thermophila is a novel type of autophagy that occurs during conjugation, in which only the parental somatic macronucleus is destined to die and is then eliminated from the progeny cytoplasm. Other coexisting nuclei, however, such as new micro- and macronuclei are unaffected. PND starts with condensation in the nucleus followed by apoptotic DNA fragmentation, lysosomal acidification, and final resorption. Because of the peculiarity in the process and the absence of some ATG genes in this organism, the mechanism of PND has remained unclear. In this study, we focus on the role of class III phosphatidylinositol 3-kinase (PtdIns3K, corresponding to yeast Vps34) in order to identify central regulators of PND. We identified the sole Tetrahymena thermophila ortholog (TtVPS34) to yeast Vps34 and human PIK3C3 (the catalytic subunit of PtdIns3K), through phylogenetic analysis, and generated the gene knockdown mutant for functional analysis. Loss of TtVPS34 activity prevents autophagosome formation on the parental macronucleus, and this nucleus escapes from the lysosomal pathway. In turn, DNA fragmentation and final resorption of the nucleus are drastically impaired. These phenotypes are similar to the situation in the ATG8Δ mutants of Tetrahymena, implying an inextricable link between TtVPS34 and TtATG8s in controlling PND as well as general macroautophagy. On the other hand, TtVPS34 does not appear responsible for the nuclear condensation and does not affect the progeny nuclear development. These results demonstrate that TtVPS34 is critically involved in the nuclear degradation events of PND in autophagosome formation rather than with an involvement in commitment to the death program. PMID:24280724

  4. 29 CFR 1952.211 - Developmental schedule.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... schedule. (a) Occupational health study accepted and implementation begun July, 1973; (b) Compliance Manual... occupational health program, July, 1975; (m) Fully implemented public employees program, December, 1975; ...

  5. Cost-effectiveness analysis of a universal mass vaccination program with a PHiD-CV 2+1 schedule in Malaysia.

    PubMed

    Wang, Xiao Jun; Saha, Ashwini; Zhang, Xu-Hao

    2017-01-01

    Currently, two pediatric pneumococcal conjugate vaccines are available in the private market of Malaysia-13-valent pneumococcal conjugate vaccine (PCV13) and pneumococcal polysaccharide and non-typeable Haemophilus influenzae protein D conjugate vaccine (PHiD-CV). This study aimed to evaluate the cost-effectiveness of a universal mass vaccination program with a PHiD-CV 2+1 schedule versus no vaccination or with a PCV13 2+1 schedule in Malaysia. A published Markov cohort model was adapted to evaluate the epidemiological and economic consequences of programs with no vaccination, a PHiD-CV 2+1 schedule or a PCV13 2+1 schedule over a 10-year time horizon. Disease cases, deaths, direct medical costs, quality-adjusted life-years (QALYs) and incremental cost-effectiveness ratios (ICERs) were estimated. Locally published epidemiology and cost data were used whenever possible. Vaccine effectiveness and disutility data were based on the best available published data. All data inputs and assumptions were validated by local clinical and health economics experts. Analyses were conducted from the perspective of the Malaysian government for a birth cohort of 508,774. Costs and QALYs were discounted at 3% per annum. One-way and probabilistic sensitivity analyses were performed. Compared with no vaccination, a PHiD-CV 2+1 program was projected to prevent 1109 invasive pneumococcal disease (IPD), 24,679 pneumonia and 72,940 acute otitis media (AOM) cases and 103 IPD/pneumonia deaths over 10 years, with additional costs and QALYs of United States dollars (USD) 30.9 million and 1084 QALYs, respectively, at an ICER of USD 28,497/QALY. Compared with a PCV13 2+1 program, PHiD-CV 2+1 was projected to result in similar reductions in IPD cases (40 cases more) but significantly fewer AOM cases (30,001 cases less), with cost savings and additional QALYs gained of USD 5.2 million and 116 QALYs, respectively, demonstrating dominance over PCV13. Results were robust to variations in one-way and

  6. Modelling the effects of booster dose vaccination schedules and recommendations for public health immunization programs: the case of Haemophilus influenzae serotype b.

    PubMed

    Charania, Nadia A; Moghadas, Seyed M

    2017-09-13

    Haemophilus influenzae serotype b (Hib) has yet to be eliminated despite the implementation of routine infant immunization programs. There is no consensus regarding the number of primary vaccine doses and an optimal schedule for the booster dose. We sought to evaluate the effect of a booster dose after receiving the primary series on the long-term disease incidence. A stochastic model of Hib transmission dynamics was constructed to compare the long-term impact of a booster vaccination and different booster schedules after receiving the primary series on the incidence of carriage and symptomatic disease. We parameterized the model with available estimates for the efficacy of Hib conjugate vaccine and durations of both vaccine-induced and naturally acquired immunity. We found that administering a booster dose substantially reduced the population burden of Hib disease compared to the scenario of only receiving the primary series. Comparing the schedules, the incidence of carriage for a 2-year delay (on average) in booster vaccination was comparable or lower than that observed for the scenario of booster dose within 1 year after primary series. The temporal reduction of symptomatic disease was similar in the two booster schedules, suggesting no superiority of one schedule over the other in terms of reducing the incidence of symptomatic disease. The findings underscore the importance of a booster vaccination for continued decline of Hib incidence. When the primary series provides a high level of protection temporarily, delaying the booster dose (still within the average duration of protection conferred by the primary series) may be beneficial to maintain longer-term protection levels and decelerate the decline of herd immunity in the population.

  7. Mission scheduling

    NASA Technical Reports Server (NTRS)

    Gaspin, Christine

    1989-01-01

    How a neural network can work, compared to a hybrid system based on an operations research and artificial intelligence approach, is investigated through a mission scheduling problem. The characteristic features of each system are discussed.

  8. 40 CFR 147.2101 - EPA-administered program-Class I, III, IV and V wells and all wells on Indian lands.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... UNDERGROUND INJECTION CONTROL PROGRAMS South Dakota § 147.2101 EPA-administered program—Class I, III, IV and V..., including those on Indian lands, and for Class II wells on Indian lands in the state of South Dakota is... program for Class I, III, IV and V wells on all lands in South Dakota, including Indian lands, and for...

  9. 40 CFR 147.2101 - EPA-administered program-Class I, III, IV and V wells and all wells on Indian lands.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... UNDERGROUND INJECTION CONTROL PROGRAMS South Dakota § 147.2101 EPA-administered program—Class I, III, IV and V..., including those on Indian lands, and for Class II wells on Indian lands in the state of South Dakota is... program for Class I, III, IV and V wells on all lands in South Dakota, including Indian lands, and for...

  10. 40 CFR 147.2101 - EPA-administered program-Class I, III, IV and V wells and all wells on Indian lands.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... UNDERGROUND INJECTION CONTROL PROGRAMS South Dakota § 147.2101 EPA-administered program—Class I, III, IV and V..., including those on Indian lands, and for Class II wells on Indian lands in the state of South Dakota is... program for Class I, III, IV and V wells on all lands in South Dakota, including Indian lands, and for...

  11. 40 CFR 147.2101 - EPA-administered program-Class I, III, IV and V wells and all wells on Indian lands.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... UNDERGROUND INJECTION CONTROL PROGRAMS South Dakota § 147.2101 EPA-administered program—Class I, III, IV and V..., including those on Indian lands, and for Class II wells on Indian lands in the state of South Dakota is... program for Class I, III, IV and V wells on all lands in South Dakota, including Indian lands, and for...

  12. 40 CFR 147.2101 - EPA-administered program-Class I, III, IV and V wells and all wells on Indian lands.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false EPA-administered program-Class I, III, IV and V wells and all wells on Indian lands. 147.2101 Section 147.2101 Protection of Environment... wells and all wells on Indian lands. (a) Contents. The UIC program for all Class I, III, IV, and V...

  13. An examination of the stretching practices of Division I and Division III college football programs in the midwestern United States.

    PubMed

    Judge, Lawrence W; Craig, Bruce; Baudendistal, Steve; Bodey, Kimberly J

    2009-07-01

    Research supports the use of preactivity warm-up and stretching, and the purpose of this study was to determine whether college football programs follow these guidelines. Questionnaires designed to gather demographic, professional, and educational information, as well as specific pre- and postactivity practices, were distributed via e-mail to midwestern collegiate programs from NCAA Division I and III conferences. Twenty-three male coaches (12 from Division IA schools and 11 from Division III schools) participated in the study. Division I schools employed certified strength coaches (CSCS; 100%), whereas Division III schools used mainly strength coordinators (73%), with only 25% CSCS. All programs used preactivity warm-up, with the majority employing 2-5 minutes of sport-specific jogging/running drills. Pre stretching (5-10 minutes) was performed in 19 programs (91%), with 2 (9%) performing no pre stretching. Thirteen respondents used a combination of static/proprioceptive neuromuscular facilitation/ballistic and dynamic flexibility, 5 used only dynamic flexibility, and 1 used only static stretching. All 12 Division I coaches used stretching, whereas only 9 of the 11 Division III coaches did (p = 0.22). The results indicate that younger coaches did not use pre stretching (p = 0.30). The majority of the coaches indicated that they did use post stretching, with 11 of the 12 Division I coaches using stretching, whereas only 5 of the 11 Division III coaches used stretching postactivity (p = 0.027). Divisional results show that the majority of Division I coaches use static-style stretching (p = 0.049). The results of this study indicate that divisional status, age, and certification may influence how well research guidelines are followed. Further research is needed to delineate how these factors affect coaching decisions.

  14. Medicare program; schedules of limits and prospectively determined payment rates for skilled nursing facility inpatient routine service costs--HCFA. Final notice with comment period.

    PubMed

    1997-10-01

    This final notice with comment period sets forth an updated schedule of limits on skilled nursing facility (SNF) routine service costs for which payment may be made under the Medicare program and sets forth an updated schedule of payment rates for low Medicare volume SNFs that elect to receive prospectively determined payment rates for routine service costs. Section 1888(a) of the Social Security Act (the Act) requires that the Secretary update the per diem cost limits for SNF routine service costs for cost reporting periods beginning on or after October 1, 1995, and every 2 years thereafter. In addition, section 1888(d)(4) of the Act requires the Secretary to establish and publish prospectively determined payment rates at least 90 days prior to the beginning of the Federal fiscal year (FY) to which such rates are to be applied.

  15. Scheduling Advisory. Research Brief

    ERIC Educational Resources Information Center

    Muir, Mike

    2005-01-01

    More and more high schools are implementing Advisory programs for a variety of reasons: personalization, academics & study skills, life success skills, self-knowledge, addressing the concern about students feeling "lost" in the high school setting, first line of contact for the parents, and portfolios. But finding a way to schedule advisory can…

  16. A DSN optimal spacecraft scheduling model

    NASA Technical Reports Server (NTRS)

    Webb, W. A.

    1982-01-01

    A computer model is described which uses mixed-integer linear programming to provide optimal DSN spacecraft schedules given a mission set and specified scheduling requirements. A solution technique is proposed which uses Bender's Method and a heuristic starting algorithm.

  17. Protein Export According to Schedule: Architecture, Assembly, and Regulation of Type III Secretion Systems from Plant- and Animal-Pathogenic Bacteria

    PubMed Central

    2012-01-01

    Summary: Flagellar and translocation-associated type III secretion (T3S) systems are present in most Gram-negative plant- and animal-pathogenic bacteria and are often essential for bacterial motility or pathogenicity. The architectures of the complex membrane-spanning secretion apparatuses of both systems are similar, but they are associated with different extracellular appendages, including the flagellar hook and filament or the needle/pilus structures of translocation-associated T3S systems. The needle/pilus is connected to a bacterial translocon that is inserted into the host plasma membrane and mediates the transkingdom transport of bacterial effector proteins into eukaryotic cells. During the last 3 to 5 years, significant progress has been made in the characterization of membrane-associated core components and extracellular structures of T3S systems. Furthermore, transcriptional and posttranscriptional regulators that control T3S gene expression and substrate specificity have been described. Given the architecture of the T3S system, it is assumed that extracellular components of the secretion apparatus are secreted prior to effector proteins, suggesting that there is a hierarchy in T3S. The aim of this review is to summarize our current knowledge of T3S system components and associated control proteins from both plant- and animal-pathogenic bacteria. PMID:22688814

  18. Automation Improves Schedule Quality and Increases Scheduling Efficiency for Residents

    PubMed Central

    Perelstein, Elizabeth; Rose, Ariella; Hong, Young-Chae; Cohn, Amy; Long, Micah T.

    2016-01-01

    Background Medical resident scheduling is difficult due to multiple rules, competing educational goals, and ever-evolving graduate medical education requirements. Despite this, schedules are typically created manually, consuming hours of work, producing schedules of varying quality, and yielding negative consequences for resident morale and learning. Objective To determine whether computerized decision support can improve the construction of residency schedules, saving time and improving schedule quality. Methods The Optimized Residency Scheduling Assistant was designed by a team from the University of Michigan Department of Industrial and Operations Engineering. It was implemented in the C.S. Mott Children's Hospital Pediatric Emergency Department in the 2012–2013 academic year. The 4 metrics of schedule quality that were compared between the 2010–2011 and 2012–2013 academic years were the incidence of challenging shift transitions, the incidence of shifts following continuity clinics, the total shift inequity, and the night shift inequity. Results All scheduling rules were successfully incorporated. Average schedule creation time fell from 22 to 28 hours to 4 to 6 hours per month, and 3 of 4 metrics of schedule quality significantly improved. For the implementation year, the incidence of challenging shift transitions decreased from 83 to 14 (P < .01); the incidence of postclinic shifts decreased from 72 to 32 (P < .01); and the SD of night shifts dropped by 55.6% (P < .01). Conclusions This automated shift scheduling system improves the current manual scheduling process, reducing time spent and improving schedule quality. Embracing such automated tools can benefit residency programs with shift-based scheduling needs. PMID:26913102

  19. A Comparison of Earned Value and Earned Schedule Duration Forecast Methods on Department of Defense Major Defense Acquisition Programs

    DTIC Science & Technology

    2012-09-01

    guidelines have been adopted by the American National Standards Institute/Electronic Industries Alliance (ANSI/ EIA - 748 EVMS) and are being used by both...than $50 million in then-year dollars follow the thirty-two management guidelines published in ANSI/ EIA - 748 EVMS, submit a monthly CPR, and a monthly...Department of Defense DoDI Department of Defense Instruction EIA Electronic Industries Alliance ES Earned Schedule EV Earned Value EVav Average

  20. Introduction of sequential inactivated polio vaccine-oral polio vaccine schedule for routine infant immunization in Brazil's National Immunization Program.

    PubMed

    Domingues, Carla Magda Allan S; de Fátima Pereira, Sirlene; Cunha Marreiros, Ana Carolina; Menezes, Nair; Flannery, Brendan

    2014-11-01

    In August 2012, the Brazilian Ministry of Health introduced inactivated polio vaccine (IPV) as part of sequential polio vaccination schedule for all infants beginning their primary vaccination series. The revised childhood immunization schedule included 2 doses of IPV at 2 and 4 months of age followed by 2 doses of oral polio vaccine (OPV) at 6 and 15 months of age. One annual national polio immunization day was maintained to provide OPV to all children aged 6 to 59 months. The decision to introduce IPV was based on preventing rare cases of vaccine-associated paralytic polio, financially sustaining IPV introduction, ensuring equitable access to IPV, and preparing for future OPV cessation following global eradication. Introducing IPV during a national multivaccination campaign led to rapid uptake, despite challenges with local vaccine supply due to high wastage rates. Continuous monitoring is required to achieve high coverage with the sequential polio vaccine schedule. Published by Oxford University Press on behalf of the Infectious Diseases Society of America 2014. This work is written by (a) US Government employee(s) and is in the public domain in the US.

  1. Scheduling algorithms

    NASA Astrophysics Data System (ADS)

    Wolfe, William J.; Wood, David; Sorensen, Stephen E.

    1996-12-01

    This paper discusses automated scheduling as it applies to complex domains such as factories, transportation, and communications systems. The window-constrained-packing problem is introduced as an ideal model of the scheduling trade offs. Specific algorithms are compared in terms of simplicity, speed, and accuracy. In particular, dispatch, look-ahead, and genetic algorithms are statistically compared on randomly generated job sets. The conclusion is that dispatch methods are fast and fairly accurate; while modern algorithms, such as genetic and simulate annealing, have excessive run times, and are too complex to be practical.

  2. The Effectiveness of Block Scheduling.

    ERIC Educational Resources Information Center

    Creamean, Sharon Lightle; Horvath, Robert Jeffery

    This report describes a program for the exploration of block scheduling. The targeted population consists of high school students in a growing, middle-class community, located in a suburban setting of a large mid-western city. The historical background of block scheduling is documented through data gathered using attendance reports, student…

  3. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    SciTech Connect

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  4. Occupational Survey Report. Volume III. Programming Specialty, AFS 511X1.

    DTIC Science & Technology

    1980-05-01

    personnel, but also by the more inexperienced respondent. *First enlistment data is probably wore valid for use in making training decisions involving...schedule leave or liberty make work assignments counsel personnel Some descriptive background factors include utilization of the COBOL pro- gramming...VI. COMPUTER SYSTEMS MONITORS. Of the 335 respondents who make up this independent job type, only 50 incumbents (15 percent) hold the 511X1 AFSC

  5. 77 FR 44721 - Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule, DME Face to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-30

    ... July 30, 2012 Part II Department of Health and Human Services Centers for Medicare & Medicaid Services... Prospective and Ambulatory Surgical Center Payment Systems and Quality Reporting Programs; Electronic Reporting Pilot; Inpatient Rehabilitation Facilities Quality Reporting Program; Quality Improvement...

  6. Report on the FY17 Development of Computer Program for ASME Section III, Division 5, Subsection HB, Subpart B Rules

    SciTech Connect

    Swindeman, M. J.; Jetter, R. I.; Sham, T. -L.

    2017-01-01

    One of the objectives of the high temperature design methodology activities is to develop and validate both improvements and the basic features of ASME Boiler and Pressure Vessel Code, Section III, Rules for Construction of Nuclear Facility Components, Division 5, High Temperature Reactors, Subsection HB, Subpart B (HBB). The overall scope of this task is to develop a computer program to aid assessment procedures of components under specified loading conditions in accordance with the elevated temperature design requirements for Division 5 Class A components. There are many features and alternative paths of varying complexity in HBB. The initial focus of this computer program is a basic path through the various options for a single reference material, 316H stainless steel. However, the computer program is being structured for eventual incorporation all of the features and permitted materials of HBB. This report will first provide a description of the overall computer program, particular challenges in developing numerical procedures for the assessment, and an overall approach to computer program development. This is followed by a more comprehensive appendix, which is the draft computer program manual for the program development. The strain limits rules have been implemented in the computer program. The evaluation of creep-fatigue damage will be implemented in future work scope.

  7. Implementation of a hepatitis A/B vaccination program using an accelerated schedule among high-risk inmates, Los Angeles County Jail, 2007-2010.

    PubMed

    Costumbrado, John; Stirland, Ali; Cox, Garrett; El-Amin, Alvin Nelson; Miranda, Armidia; Carter, Ann; Malek, Mark

    2012-11-06

    The Centers for Disease Control and Prevention recommend vaccination for men who have sex with men (MSM) and injection drug users against hepatitis A and B. This study is the first report of a hepatitis vaccination program in a United States jail with a combined vaccine using an accelerated schedule. Los Angeles County has the largest jail system in the nation and Men's Central Jail (MCJ) is the largest facility within that system. MCJ includes a unit for self-identified MSM, where approximately 2700 inmates are housed per year. Starting in August 2007, a combined hepatitis A and B vaccine was offered to all inmates housed in this special unit. Using an accelerated schedule (0-, 7-, 21-30 days, 12-month booster), a total of 3931 doses were administered to 1633 inmates as of June 2010. Of those, 77% received 2 doses, 58% received 3 doses, and 11% received the booster dose. Inmates who screened positive for a sexually transmitted infection in this unit were 1.3 times more likely to be vaccinated (95% CI 1.2-1.4) compared to others in the same housing unit who screened negative. Hepatitis vaccination initiatives can be successfully implemented in an urban jail among an extremely high-risk population using the accelerated, combined hepatitis A/B vaccine. Ours may be a useful model for other programs to vaccinate incarcerated populations. Copyright © 2012 Elsevier Ltd. All rights reserved.

  8. A Linear Programming Model for Scheduling Prison Guards. Applications of Linear Programming to Operations Research. Modules and Monographs in Undergraduate Mathematics and Its Applications Project. UMAP Module 272.

    ERIC Educational Resources Information Center

    Maynard, James M.

    A work-scheduling model for Corrections Officers at State Correctional Institutions is described. This is a real-life model that was developed to deal with a problem of unacceptably large expenditures for overtime work by state prison guards. The problem involves more than 200 constraints and more than 800 variables. It is felt the model can be…

  9. What Do Schools Want? Assessing Elementary School Administrator and Teacher Preferences Related to Nutrition Education Program Scheduling

    ERIC Educational Resources Information Center

    Hermann, Janice; Parker, Stephany; Phelps, Josh; Brown, Barbara

    2011-01-01

    Extension is positioned to provide school-based nutrition education programs as required by the 2004 Child Nutrition and WIC Reauthorization Act. To enhance program acceptance and sustainability, it is important to consider school administrators' and teachers' interests and preferences regarding nutrition education programming. The project…

  10. What Do Schools Want? Assessing Elementary School Administrator and Teacher Preferences Related to Nutrition Education Program Scheduling

    ERIC Educational Resources Information Center

    Hermann, Janice; Parker, Stephany; Phelps, Josh; Brown, Barbara

    2011-01-01

    Extension is positioned to provide school-based nutrition education programs as required by the 2004 Child Nutrition and WIC Reauthorization Act. To enhance program acceptance and sustainability, it is important to consider school administrators' and teachers' interests and preferences regarding nutrition education programming. The project…

  11. An optimization based on simulation approach to the patient admission scheduling problem using a linear programing algorithm.

    PubMed

    Granja, C; Almada-Lobo, B; Janela, F; Seabra, J; Mendes, A

    2014-12-01

    As patient's length of stay in waiting lists increases, governments are looking for strategies to control the problem. Agreements were created with private providers to diminish the workload in the public sector. However, the growth of the private sector is not following the demand for care. Given this context, new management strategies have to be considered in order to minimize patient length of stay in waiting lists while reducing the costs and increasing (or at least maintaining) the quality of care. Appointment scheduling systems are today known to be proficient in the optimization of health care services. Their utilization is focused on increasing the usage of human resources, medical equipment and reducing the patient waiting times. In this paper, a simulation-based optimization approach to the Patient Admission Scheduling Problem is presented. Modeling tools and simulation techniques are used in the optimization of a diagnostic imaging department. The proposed techniques have demonstrated to be effective in the evaluation of diagnostic imaging workflows. A simulated annealing algorithm was used to optimize the patient admission sequence towards minimizing the total completion and total waiting of patients. The obtained results showed average reductions of 5% on the total completion and 38% on the patients' total waiting time. Copyright © 2014 Elsevier Inc. All rights reserved.

  12. Payload crew training scheduler (PACTS) user's manual

    NASA Technical Reports Server (NTRS)

    Shipman, D. L.

    1980-01-01

    The operation of the payload specialist training scheduler (PACTS) is discussed in this user's manual which is used to schedule payload specialists for mission training on the Spacelab experiments. The PACTS program is a fully automated interactive, computerized scheduling program equipped with tutorial displays. The tutorial displays are sufficiently detailed for use by a program analyst having no computer experience. The PACTS program is designed to operate on the UNIVAC 1108 computer system, and has the capability to load output into a PDP 11/45 Interactive Graphics Display System for printing schedules. The program has the capacity to handle up to three overlapping Spacelab missions.

  13. Planning and scheduling for success

    NASA Technical Reports Server (NTRS)

    Manzanera, Ignacio

    1994-01-01

    Planning and scheduling programs are excellent management tools when properly introduced to the project management team and regularly maintained. Communications, creativity, flexibility and accuracy are substantially improved by following a simple set of rules. A planning and scheduling program will work for you if you believe in it, make others in your project team realize its benefits, and make it an extension of your project cost control philosophy.

  14. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    PubMed

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable.

  15. Gang scheduling a parallel machine

    SciTech Connect

    Gorda, B.C.; Brooks, E.D. III.

    1991-03-01

    Program development on parallel machines can be a nightmare of scheduling headaches. We have developed a portable time sharing mechanism to handle the problem of scheduling gangs of processors. User program and their gangs of processors are put to sleep and awakened by the gang scheduler to provide a time sharing environment. Time quantums are adjusted according to priority queues and a system of fair share accounting. The initial platform for this software is the 128 processor BBN TC2000 in use in the Massively Parallel Computing Initiative at the Lawrence Livermore National Laboratory. 2 refs., 1 fig.

  16. Gang scheduling a parallel machine

    SciTech Connect

    Gorda, B.C.; Brooks, E.D. III.

    1991-12-01

    Program development on parallel machines can be a nightmare of scheduling headaches. We have developed a portable time sharing mechanism to handle the problem of scheduling gangs of processes. User programs and their gangs of processes are put to sleep and awakened by the gang scheduler to provide a time sharing environment. Time quantum are adjusted according to priority queues and a system of fair share accounting. The initial platform for this software is the 128 processor BBN TC2000 in use in the Massively Parallel Computing Initiative at the Lawrence Livermore National Laboratory.

  17. Program for Assisting the Replacement of Industrial Solvents PARIS III User’s Guide

    EPA Science Inventory

    PARIS III is a third generation Windows-based computer software to assist the design of less harmful solvent replacements by estimating values of the solvent properties that characterize the static, dynamic, performance, and environmental behavior of the original solvent mixture ...

  18. Discovery: Guidelines for Establishing an Outdoor Education Program in Special Education, ESEA Title III Project.

    ERIC Educational Resources Information Center

    Bott, Kristine Ann; Bannasch, Donald Max

    Funded through the 1965 Elementary and Secondary Education Act (ESEA) Title III, the Project began serving youngsters handicapped either physically, mentally, or emotionally, who qualified for special education services in the fall of 1971. Among its objectives were to: (1) improve these youngsters' achievement in reqular school subjects, their…

  19. A Program of Yersinia enterocolitica Type III Secretion Reactions Is Activated by Specific Signals

    PubMed Central

    Lee, Vincent T.; Mazmanian, Sarkis K.; Schneewind, Olaf

    2001-01-01

    Successful establishment of Yersinia infections requires the type III machinery, a protein transporter that injects virulence factors (Yops) into macrophages. It is reported here that the Yersinia type III pathway responds to environmental signals by transporting proteins to distinct locations. Yersinia enterocolitica cells sense an increase in extracellular amino acids (glutamate, glutamine, aspartate, and asparagine) that results in the activation of the type III pathway. Another signal, provided by serum proteins such as albumin, triggers the secretion of YopD into the extracellular medium. The third signal, a decrease in calcium concentration, appears to be provided by host cells and causes Y. enterocolitica to transport YopE and presumably other virulence factors across the eukaryotic plasma membrane. Mutations in several genes encoding regulatory molecules (lcrG, lcrH, tyeA, yopD, yopN, yscM1, and yscM2) bypass the signal requirement of the type III pathway. Together these results suggest that yersiniae may have evolved distinct secretion reactions in response to environmental signals. PMID:11489848

  20. Program for Assisting the Replacement of Industrial Solvents PARIS III User’s Guide

    EPA Science Inventory

    PARIS III is a third generation Windows-based computer software to assist the design of less harmful solvent replacements by estimating values of the solvent properties that characterize the static, dynamic, performance, and environmental behavior of the original solvent mixture ...

  1. NIF Title III engineering plan

    SciTech Connect

    Deis, G

    1998-06-01

    The purpose of this document is to define the work that must be accomplished by the NIF Project during Title III Engineering. This definition is intended to be sufficiently detailed to provide a framework for yearly planning, to clearly identify the specific deliverables so that the Project teams can focus on them, and to provide a common set of objectives and processes across the Project. This plan has been preceded by similar documents for Title I and Title II design and complements the Site Management Plan, the Project Control Manual, the Quality Assurance Program Plan, the RM Parsons NIF Title III Configuration Control Plan, the Integrated Project Schedule, the Preliminary Safety Analysis Report, the Configuration Management Plan, and the Transition Plan.

  2. 76 FR 32409 - Medicare Program; Five-Year Review of Work Relative Value Units Under the Physician Fee Schedule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-06

    ...This proposed notice sets forth proposed revisions to work relative value units (RVUs) and corresponding changes to the practice expense and malpractice RVUs affecting payment for physicians' services. The statute requires that we review RVUs no less often than every 5 years. This is our Fourth Five-Year Review of Work RVUs since we implemented the physician fee schedule (PFS) on January 1, 1992. These revisions to work RVUs are proposed to be effective for services furnished beginning January 1, 2012. These revisions reflect changes in medical practice and coding that affect the relative amount of physician work required to perform each service as required by the statute. The Fourth Five-Year Review of Work includes services that were submitted through public comment and by the Medicare contractor medical directors (CMDs), as well as a number of potentially misvalued codes identified by CMS (that is, Harvard valued codes and codes with Site-of-Service anomalies).

  3. Revenues and Expenses of Division III Intercollegiate Athletics Programs. Financial Trends and Relationships - 1997.

    ERIC Educational Resources Information Center

    Fulks, Daniel L.

    This report provides summary information concerning revenues and expenses of NCAA Division 3 intercollegiate athletics programs for the 1996-1997 fiscal year. The report compares revenue and expense trends of athletics programs within each of the NCAA divisions and revenues and expenses between men's and women's athletic programs. The…

  4. Reaction to Reexamination: More on Type III Error in Program Evaluation.

    ERIC Educational Resources Information Center

    Cook, Thomas J.; Dobson, L. Douglas

    1982-01-01

    The authors respond to criticism and analyses by Eva Rezmovic (TM 507 851) of their experimental design, particularly the suggested use of information on the amount of program service received by the control group comparable to the treatment group in their study of the relationship between program implementation levels and program outcomes. (CM)

  5. 48 CFR 2908.404 - Using schedules.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SOURCES OF SUPPLIES AND SERVICES Federal Supply Schedules 2908.404 Using schedules. Small business... followed may be modified by the Office of Small Business Program as appropriate in order to comply with GSA Federal Supply Schedule procedures (e.g., first tier contracts may be required to report their commercial...

  6. ASTER Scheduling Prioritization Function

    NASA Technical Reports Server (NTRS)

    Cohen, Ron

    1996-01-01

    ASTER schedules are generated by an automated scheduling system. This scheduler will generate psuedo-optimal schedules based on a priority scheme. This priority scheme is controlled by the Science Team.

  7. SARDA Surface Schedulers

    NASA Technical Reports Server (NTRS)

    Malik, Waqar

    2016-01-01

    Provide an overview of algorithms used in SARDA (Spot and Runway Departure Advisor) HITL (Human-in-the-Loop) simulation for Dallas Fort-Worth International Airport and Charlotte Douglas International airport. Outline a multi-objective dynamic programming (DP) based algorithm that finds the exact solution to the single runway scheduling (SRS) problem, and discuss heuristics to restrict the search space for the DP based algorithm and provide improvements.

  8. Schedule Analytics

    DTIC Science & Technology

    2016-04-30

    funding stability, program manager experience, requirements change , technology readiness levels, etc.), but these parameters may be difficult to collect...Analyst, The MITRE Corp. Thomas Fugate, Principal Acquisition and Program Management Analyst, The MITRE Corp. Published April 30, 2016 Approved for...Manring, Principal Economics and Business Analyst, The MITRE Corp. Thomas Fugate, Principal Acquisition and Program Management Analyst, The MITRE

  9. 21 CFR 1308.13 - Schedule III.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... a stimulant effect on the central nervous sxstem, including its salts, isomers (whether optical, position, or geometric), and salts of such isomers whenever the existence of such salts, isomers, and salts of isomers is possible within the specific chemical designation: (1) Those compounds, mixtures,...

  10. 21 CFR 1308.13 - Schedule III.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... a stimulant effect on the central nervous system, including its salts, isomers (whether optical, positional, or geometric), and salts of such isomers whenever the existence of such salts, isomers, and salts of isomers is possible within the specific chemical designation: (1) Those compounds, mixtures,...

  11. 21 CFR 1308.13 - Schedule III.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... a stimulant effect on the central nervous system, including its salts, isomers (whether optical, positional, or geometric), and salts of such isomers whenever the existence of such salts, isomers, and salts of isomers is possible within the specific chemical designation: (1) Those compounds, mixtures,...

  12. 21 CFR 1308.13 - Schedule III.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... a stimulant effect on the central nervous system, including its salts, isomers (whether optical, positional, or geometric), and salts of such isomers whenever the existence of such salts, isomers, and salts of isomers is possible within the specific chemical designation: (1) Those compounds, mixtures,...

  13. 21 CFR 1308.13 - Schedule III.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... a stimulant effect on the central nervous sxstem, including its salts, isomers (whether optical, position, or geometric), and salts of such isomers whenever the existence of such salts, isomers, and salts of isomers is possible within the specific chemical designation: (1) Those compounds, mixtures,...

  14. Astronaut Office Scheduling System Software

    NASA Technical Reports Server (NTRS)

    Brown, Estevancio

    2010-01-01

    AOSS is a highly efficient scheduling application that uses various tools to schedule astronauts weekly appointment information. This program represents an integration of many technologies into a single application to facilitate schedule sharing and management. It is a Windows-based application developed in Visual Basic. Because the NASA standard office automation load environment is Microsoft-based, Visual Basic provides AO SS developers with the ability to interact with Windows collaboration components by accessing objects models from applications like Outlook and Excel. This also gives developers the ability to create newly customizable components that perform specialized tasks pertaining to scheduling reporting inside the application. With this capability, AOSS can perform various asynchronous tasks, such as gathering/ sending/ managing astronauts schedule information directly to their Outlook calendars at any time.

  15. A Systematic Review of Health-Promotion Programs in NCAA Division III Institutions

    ERIC Educational Resources Information Center

    Hanson, Matthew

    2011-01-01

    Health-promotion in the workplace has existed for numerous years. However, the availability of health-promotion programs offered in institutions of higher education has seemed to lag behind other industries such as business. The purpose of this survey research project was to identify specific components of health-promotion programs within NCAA…

  16. Phase III Executive Summary. Evaluation of the Child and Family Resource Program (CFRP).

    ERIC Educational Resources Information Center

    Nauta, Marrit J.

    The Child and Family Resource Program (CFRP) is a family-oriented child development program initiated by the Administration for Children, Youth and Families to provide support services to low-income families and their children. This report summarizes preliminary findings based on the first year and a half of CFRP evalution. Following the brief…

  17. Phase III Research Report. Evaluation of the Child and Family Resource Program (CFRP).

    ERIC Educational Resources Information Center

    Nauta, Marrit J.; And Others

    This report, sixth in a series of Child and Family Resource Program (CFRP) evaluations, focuses on CFRP impact on families within outcome domains other than child development after a year and a half of program participation, additionally describing the nature and extent of that participation. Chapter 1 provides an overview of the CFRP evaluation…

  18. Special Programs in Medical Library Education, 1957-1971: Part III. The Trainees *†

    PubMed Central

    Roper, Fred W.

    1974-01-01

    This report describes the personal characteristics of the former trainees and their opinions about their training program experiences. More of the degree program trainees were under thirty (71%) than was the case with the internship program trainees (45%). The male-female ratio for each of the two groups is approximately 1:4. Approximately 60% of the degree program trainees entered their training with majors in the natural or health sciences, while less than 50% of the total group hold degrees in the natural or health sciences. Slightly less than 60% of the total group of trainees were employed in medical libraries in 1971. However, 68.5% of the internship program trainees as compared to 46.0% of the degree program trainees held positions in medical libraries. The reasons cited most often for leaving medical librarianship were the lack of available positions and student status. The major reasons indicated by the former trainees for entering the medical library education programs were an interest in the biomedical subject fields, the availability of funds, and the desire to gain experience. The reactions of the former trainees to their training program experiences were favorable. PMID:4462687

  19. An Educational Component Incorporated into a Residential Drug Rehabilitation Program. Phase III. Report of Pilot Project.

    ERIC Educational Resources Information Center

    Morgenstein, Melvin; Strongin, Harriet

    A major aspect of therapeutic programs conducted for drug addicts involves residential centers where group dynamics and self-discipline form the central operating themes. This project was designed to implement and observe an educational program design for resident drug addicts in an attempt to reduce recidivism and to prepare them for productive…

  20. School Community Education Program in New York City 1985-86: Volume III. OEA Evaluation Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn. Office of Educational Assessment.

    During 1985-86 the School Community Education Program (also known as the Umbrella Program), funded by the New York State Legislature, provided a variety of educational and training experiences to some 25,871 participants, including pre-kindergarten children and their parents; and students, teachers and supervisors from kindergarten through grade…

  1. Systematic Instruction for Retarded Children: The Illinois Program. Part III: Self-Help Instruction.

    ERIC Educational Resources Information Center

    Linford, Maxine D.; And Others

    The manual for programed instruction of self care skills for trainable mentally handicapped children consists of dressing, dining, grooming, and toilet training. Teaching methods used include behavioral analysis and management, task analysis, and errorless learning. The lesson plans in each section are programed to maximize the child's success at…

  2. Storage Reliability of Missile Materiel Program. Storage Reliability Summary Report. Volume III. Hydraulic and Pneumatic Devices

    DTIC Science & Technology

    1978-01-01

    Devices; Volume III, Hydraulic and Pneumatic Devices; Volume IV, Ordnance Devices; and Volume V , Optical and Electro Optical Devices. Table 1-1...Devices Volume V Optical and Electro Optical Devices Detailed Rept. Number & Date LC-78-IC1, 1/78 LC-78-VT1, 1/78 LC-78-EM1, LC-78-EM2, LC-78...BATTERIES v Silver-Zinc Thermal 23.8 10.526 42.0 94.3 97.9 367. 5.0 BEARINGS Ball 200.0 5.0 19.5 6.0 COMPRESSORS .245 ɜ,085.0 9434. 7.0

  3. Production Systems as a Programming Language for Artificial Intelligence Applications. Volume III.

    DTIC Science & Technology

    1976-12-01

    2iui OSMS OIS WVig Kid -D.C8W 1103 12 0WiI" I VI-VfWW.IWVi IW I I 114152111 L.4M Wig W? I W2S " l BMOCs 301*2 III w AN 4IS I WII -Wi2 M23 S * PC I15110UI...BOK~-I CLON PEfl POSI 19LACY-1 SIZE SIVIL. POrn ) REJECTING (394 7") of * (ULOCIC-2 COLOR GPEN~ POS) IBLOK-2 SIZE LANGE POSI I.LOC-3 COLON RE P05

  4. 75 FR 73169 - Medicare Program; Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ... for diabetes self-management training programs and kidney disease education services. Ryan Howe, (410... Caps B. Diabetes Self-Management Training (DSMT) Services (HCPCS Codes G0108 and G0109) 1. Background 2... American Association of Clinical Endocrinologists AADE American Association of Diabetes Educators...

  5. 10 CFR Appendix D to Part 73 - Physical Protection of Irradiated Reactor Fuel in Transit, Training Program Subject Schedule

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... members of local law enforcement agencies, have completed a weapons training and qualifications program... routes Communications —Equipment operation —Status reporting —Contacts with law enforcement units... each such individual is fully qualified to use weapons assigned him. ...

  6. 10 CFR Appendix D to Part 73 - Physical Protection of Irradiated Reactor Fuel in Transit, Training Program Subject Schedule

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... members of local law enforcement agencies, have completed a weapons training and qualifications program... routes Communications —Equipment operation —Status reporting —Contacts with law enforcement units... each such individual is fully qualified to use weapons assigned him. ...

  7. 78 FR 17895 - Schedules of Controlled Substances: Placement of Alfaxalone into Schedule IV

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-25

    ... dependence or psychological dependence relative to the drugs or other substances in Schedule III. 21 U.S.C... models of anxiety, such as the elevated plus maze, the conflict test and restraint stress. In a published...

  8. ORTEP-III: Oak Ridge Thermal Ellipsoid Plot Program for crystal structure illustrations

    SciTech Connect

    Burnett, M.N.; Johnson, C.K.

    1996-07-01

    This report describes a computer program for drawing crystal structure illustrations. Ball-and-stick type illustrations of a quality suitable for publication are produced with either spheres or thermal-motion probability ellipsoids on the atomic sites. The program can also produce stereoscopic pairs of illustrations which aid in the visualization of complex packing arrangements of atoms and thermal motion patterns. Interatomic distances, bond angles, and principal axes of thermal motion are also calculated to aid the structural study.

  9. The Biennial Report to Congress on the Implementation of the Title III State Formula Grant Program: School Years 2006-08

    ERIC Educational Resources Information Center

    Office of English Language Acquisition, US Department of Education, 2012

    2012-01-01

    This is the third biennial report to Congress on the implementation of the "Elementary and Secondary Education Act's" Title III State Formula Grant Program (also known as the English Language Acquisition State Grants Program). This report provides information regarding the U.S. Department of Education's efforts to hold states accountable…

  10. The Biennial Report to Congress on the Implementation of the Title III State Formula Grant Program: School Years 2008-10

    ERIC Educational Resources Information Center

    Office of English Language Acquisition, US Department of Education, 2013

    2013-01-01

    This is the fourth biennial report to Congress on the implementation of the "Elementary and Secondary Education Act's" Title III State Formula Grant Program (also known as the English Language Acquisition State Grants Program). This report provides information reported by states to the U.S. Department of Education regarding services…

  11. Model Early Childhood Learning Program, Baltimore, Maryland. Model Programs, Title III--Elementary and Secondary Education Act.

    ERIC Educational Resources Information Center

    National Center for Educational Communication (DHEW/NIE), Washington, DC.

    The purpose of the Model Early Childhood Learning Program of Baltimore, Md., City Schools is to provide experiences for disadvantaged children which will constitute the prerequisite developmental history needed to undertake first grade concepts and skills. The project's stated objectives are: (1) to improve the measured aptitude or readiness for…

  12. A System for Automatically Generating Scheduling Heuristics

    NASA Technical Reports Server (NTRS)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  13. A System for Automatically Generating Scheduling Heuristics

    NASA Technical Reports Server (NTRS)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  14. PIP-III and future opportunities in the US Neutrino Programs

    NASA Astrophysics Data System (ADS)

    Derwent, Paul

    2017-01-01

    The focus of Fermilab's long term research program is the physics of neutrino oscillations. The Deep Underground Neutrino Experiment (DUNE), located at the Sanford Underground Research Facility in Lead, South Dakota, will study neutrino oscillations with a baseline of 1300 km. The neutrinos will be produced in the Long Baseline Neutrino Facility (LBNF), a proposed new beam line from Fermilab's Main Injector. The physics goals of DUNE require a proton beam with a power of roughly 2.5 MW at 120 GeV, which is about four times the current maximum power. In addition to the long baseline program, Fermilab is pursuing a comprehensive program to investigate short baseline neutrino physics. I will present a view on how the Fermilab accelerator complex will evolve to meet these goals.

  15. Medicare program; revisions to payment policies under the physician fee schedule for calendar year 2001. Health Care Financing Administration (HCFA), HHS. Final rule with comment period.

    PubMed

    2000-11-01

    This final rule with comment period makes several changes affecting Medicare Part B payment. The changes include: refinement of resource-based practice expense relative value units (RVUs); the geographic practice cost indices; resource-based malpractice RVUs; critical care RVUs; care plan oversight and physician certification and recertification for home health services; observation care codes; ocular photodynamic therapy and other ophthalmological treatments; electrical bioimpedance; antigen supply; and the implantation of ventricular assist devices. This rule also addresses the comments received on the May 3, 2000 interim final rule on the supplemental survey criteria and makes modifications to the criteria for data submitted in 2001. Based on public comments we are withdrawing our proposals related to the global period for insertion, removal, and replacement of pacemakers and cardioverter defibrillators and low intensity ultrasound. This final rule also discusses or clarifies the payment policy for incomplete medical direction, pulse oximetry services, outpatient therapy supervision, outpatient therapy caps, HCPCS "G" Codes, and the second 5-year refinement of work RVUs for services furnished beginning January 1, 2002. In addition, we are finalizing the calendar year (CY) 2000 interim physician work RVUs and are issuing interim RVUs for new and revised codes for CY 2001. We are making these changes to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. This final rule also announces the CY 2001 Medicare physician fee schedule conversion factor under the Medicare Supplementary Medical Insurance (Part B) program as required by section 1848(d) of the Social Security Act. The 2001 Medicare physician fee schedule conversion factor is $38.2581.

  16. Evolutionary Scheduler for the Deep Space Network

    NASA Technical Reports Server (NTRS)

    Guillaume, Alexandre; Lee, Seungwon; Wang, Yeou-Fang; Zheng, Hua; Chau, Savio; Tung, Yu-Wen; Terrile, Richard J.; Hovden, Robert

    2010-01-01

    A computer program assists human schedulers in satisfying, to the maximum extent possible, competing demands from multiple spacecraft missions for utilization of the transmitting/receiving Earth stations of NASA s Deep Space Network. The program embodies a concept of optimal scheduling to attain multiple objectives in the presence of multiple constraints.

  17. Creating a Complex Schedule with "REFLEX."

    ERIC Educational Resources Information Center

    Kren, George M.; Christakes, George

    1991-01-01

    Discusses "REFLEX," a software package for scheduling. Explores the program's applications in preparing a departmental class schedule. Explains that "REFLEX" includes a filter function and some attributes of a spreadsheet but lacks the ability to interact with other databases. Concludes that the program can make scheduling…

  18. Effectiveness and Efficiency of Nursing Education Programs. Volume III: Analysis of the Literature.

    ERIC Educational Resources Information Center

    Cresap, McCormick, and Paget, Inc., Washington, DC.

    The three volume study is a review of the available literature to determine the relative effectiveness and efficiency of diploma, associate degree, and baccalaureate nursing education programs in producing the number and quality of registered nurses needed in the nation; and to analyze the cost of nursing education. Volume three notes that a mild…

  19. A Guide for Planning Drafting and Design Technology Programs. Section III, Data Collection and Analysis.

    ERIC Educational Resources Information Center

    1971

    This document, the second of three related reports, constitutes the data collection and analysis section of the study designed to provide information for preparing a planning guide for drafting and design technology programs. The curriculum survey instrument mailed to 26 schools, contained questions regarding: (1) length of semesters, (2)…

  20. Highway Surveying. Instructor's Guide for an Adult Course. Highway Technicians Program Unit III.

    ERIC Educational Resources Information Center

    Fimmano, Ralph; Kacharian, John C.

    The revised instructor's guide, which is part of the New York State Highway Technician's Program to provide needed technicians and engineers by upgrading people in the lower-level technician jobs, is geared toward the improvement of technical skills and knowledge in highway surveying. In view of the shortage of qualified technicians and engineers…

  1. Core III Materials for Rural Agriculture Programs. Units H-I.

    ERIC Educational Resources Information Center

    Courson, Roger L.; And Others

    This curriculum guide includes teaching packets for nine problem areas of study to be included in a core curriculum for 11th-grade or third-year students enrolled in rural agricultural programs in Illinois. Each problem area includes some or all of the following components: suggestions to the teacher, a teacher guide, a competency inventory, an…

  2. Evaluation of the National Science Foundation's Local Course Improvement Program, Volume III: Case Studies.

    ERIC Educational Resources Information Center

    Kulik, James A.; And Others

    This report is the third of three volumes describing the results of the evaluation of the National Science Foundation (NSF) Local Course Improvement (LOCI) program. This volume describes 12 project case studies undertaken as part of that evaluation. Three projects were designed to increase individualization of college science teaching; two…

  3. The Survey of College Marketing Programs. Volume III: Electronic Advertising and Marketing.

    ERIC Educational Resources Information Center

    Primary Research Group, Inc., New York, NY.

    This report presents 203 tables detailing findings concerning the use of electronic advertising within marketing programs at 68 colleges and universities. Highlights of this report include: colleges in the sample enroll a mean of 5,450 students; 5.6 percent of the colleges produce a CD-ROM version of the viewbook; 39.7 percent enable applicants to…

  4. Core III Materials for Metropolitan Agriculture/Horticulture Programs. Units A-I.

    ERIC Educational Resources Information Center

    Biondo, Ron; And Others

    This first volume of a two-volume curriculum guide contains 11 problem areas selected for study to be included in a core curriculum for 11th-grade or third-year students enrolled in a metropolitan agricultural program. The 11 problem areas are divided into eight units: Orientation to Agricultural Occupations (Gaining Employment), Supervised…

  5. 25 CFR 36.12 - Standard III-Program needs assessment.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... curricula shall be developed and revised based on an assessment of educational needs. This needs assessment... Program Evaluation. This assessment shall include at least the following: (a) A clear statement of student..., skills, attitudes, or concepts students are expected to exhibit upon completion of a grade level....

  6. 25 CFR 36.12 - Standard III-Program needs assessment.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... curricula shall be developed and revised based on an assessment of educational needs. This needs assessment... Program Evaluation. This assessment shall include at least the following: (a) A clear statement of student..., skills, attitudes, or concepts students are expected to exhibit upon completion of a grade level....

  7. 25 CFR 36.12 - Standard III-Program needs assessment.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... curricula shall be developed and revised based on an assessment of educational needs. This needs assessment... Program Evaluation. This assessment shall include at least the following: (a) A clear statement of student..., skills, attitudes, or concepts students are expected to exhibit upon completion of a grade level....

  8. 25 CFR 36.12 - Standard III-Program needs assessment.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... curricula shall be developed and revised based on an assessment of educational needs. This needs assessment... Program Evaluation. This assessment shall include at least the following: (a) A clear statement of student..., skills, attitudes, or concepts students are expected to exhibit upon completion of a grade level....

  9. 25 CFR 36.12 - Standard III-Program needs assessment.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... curricula shall be developed and revised based on an assessment of educational needs. This needs assessment... Program Evaluation. This assessment shall include at least the following: (a) A clear statement of student..., skills, attitudes, or concepts students are expected to exhibit upon completion of a grade level....

  10. Habilitation of the Severely and Profoundly Retarded: Volume III. Reports from the Specialized Training Program.

    ERIC Educational Resources Information Center

    Horner, Robert H., Ed.; Bellamy, G. Thomas, Ed.

    Sixteen papers concerned with vocational habilitation of the severely and profoundly retarded are organized into three parts: issues in habilitation, stimulus control of vocational behavior, and instrumentation for program evaluation. Papers have the following titles and authors: "Structured Employment: Productivity and Productive Capacity" (R.…

  11. Core III Materials for Metropolitan Agriculture/Horticulture Programs. Units J-M.

    ERIC Educational Resources Information Center

    Biondo, Ron; And Others

    This second volume of a two-volume curriculum guide contains 11 problem areas selected for study to be included in a core curriculum for 11th grade or third-year students enrolled in a metropolitan agricultural program. The 11 problem areas are divided into four units: Soil Science and Conservation of Natural Resources (Understanding Soils,…

  12. The Survey of College Marketing Programs. Volume III: Electronic Advertising and Marketing.

    ERIC Educational Resources Information Center

    Primary Research Group, Inc., New York, NY.

    This report presents 203 tables detailing findings concerning the use of electronic advertising within marketing programs at 68 colleges and universities. Highlights of this report include: colleges in the sample enroll a mean of 5,450 students; 5.6 percent of the colleges produce a CD-ROM version of the viewbook; 39.7 percent enable applicants to…

  13. Core III Materials for Rural Agriculture Programs. Units A-G.

    ERIC Educational Resources Information Center

    Courson, Roger L.; And Others

    This curriculum guide includes teaching packets for 12 areas of study to be included in a core curriculum for 11th-grade or third-year students enrolled in rural agricultural programs in Illinois. Each problem area includes some or all of the following components: suggestions to the teacher, teacher guide, competency inventory, information sheet,…

  14. Effectiveness and Efficiency of Nursing Education Programs. Volume III: Analysis of the Literature.

    ERIC Educational Resources Information Center

    Cresap, McCormick, and Paget, Inc., Washington, DC.

    The three volume study is a review of the available literature to determine the relative effectiveness and efficiency of diploma, associate degree, and baccalaureate nursing education programs in producing the number and quality of registered nurses needed in the nation; and to analyze the cost of nursing education. Volume three notes that a mild…

  15. Pseudomonas type III effector AvrPtoB induces plant disease susceptibility by inhibition of host programmed cell death

    PubMed Central

    Abramovitch, Robert B.; Kim, Young-Jin; Chen, Shaorong; Dickman, Martin B.; Martin, Gregory B.

    2003-01-01

    The AvrPtoB type III effector protein is conserved among diverse genera of plant pathogens suggesting it plays an important role in pathogenesis. Here we report that Pseudomonas AvrPtoB acts inside the plant cell to inhibit programmed cell death (PCD) initiated by the Pto and Cf9 disease resistance proteins and, remarkably, the pro-apoptotic mouse protein Bax. AvrPtoB also suppressed PCD in yeast, demonstrating that AvrPtoB functions as a cell death inhibitor across kingdoms. Using truncated AvrPtoB proteins, we identified distinct N- and C-terminal domains of AvrPtoB that are sufficient for host recognition and PCD inhibition, respectively. We also identified a novel resistance phenotype, Rsb, that is triggered by an AvrPtoB truncation disrupted in the anti-PCD domain. A Pseudomonas syringae pv. tomato DC3000 strain with a chromosomal mutation in the AvrPtoB C-terminus elicited Rsb-mediated immunity in previously susceptible tomato plants and disease was restored when full-length AvrPtoB was expressed in trans. Thus, our results indicate that a type III effector can induce plant susceptibility to bacterial infection by inhibiting host PCD. PMID:12505984

  16. Medicare program; schedules of per-visit and per-beneficiary limitations on home health agency costs for cost reporting periods beginning on or after October 1, 1998; correction--HCFA. Correction of notice with comment period.

    PubMed

    1998-10-28

    In the August 11, 1998 issue of the Federal Register (63 FR 42912), we published a notice with comment period setting forth revised schedules of limitations on home health agency costs that may be paid under the Medicare program for cost reporting periods beginning on or after October 1, 1998. This document corrects technical and typographical errors made in that document.

  17. Family Contribution Schedule for the Basic Educational Opportunity Grant Program, 1979. Hearing Before the Subcommittee on Education, Arts and Humanities of the Committee on Labor and Human Resources, United States Senate, Ninety-Sixth Congress (April 6, 1979).

    ERIC Educational Resources Information Center

    Congress of the U.S., Washington, DC. Senate Committee on Human Resources.

    The text of a hearing before the Senate Subcommittee on Education, Arts and Humanities is presented in which the family contribution schedule for the Basic Educational Opportunity Grant (BEOG) Program for 1979 was discussed. A letter from Joseph Califano, Secretary of Health, Education and Welfare, states that implementation of the BEOG program…

  18. 29 CFR 1952.211 - Developmental schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR... schedule. (a) Occupational health study accepted and implementation begun July, 1973; (b) Compliance Manual... occupational health program, July, 1975; (m) Fully implemented public employees program, December, 1975; ...

  19. Dance-based exercise program in rheumatoid arthritis. Feasibility in individuals with American College of Rheumatology functional class III disease.

    PubMed

    Noreau, L; Moffet, H; Drolet, M; Parent, E

    1997-01-01

    Many studies have demonstrated that aerobic exercise training is beneficial to prevent physical deconditioning in persons with rheumatoid arthritis (RA) without inducing adverse effects on individual's joints and general health. After significant results in individuals with RA (Functional Class I and II), the present study was conducted to demonstrate the feasibility of a modified dance-based exercise program to improve the physical fitness and psychological state of persons with RA (Class III). Ten (10) female subjects (mean age, 54 +/- 10 years) participated in an eight-week exercise program (twice weekly). Health status, use of medication, joint pain and swelling, cardiorespiratory fitness, activity of daily living, and psychological state were assessed before and after the training program. A high level of participation has been maintained by the participants (mean = 14.8/16 sessions). Most of them were able to perform a maximal exercise test on treadmill and reached 90% of the predicted heart rate at maximal exercise. No significant gain in aerobic power was observed for the group as a whole, but four subjects showed improvements of between 10% and 20% of their cardiorespiratory fitness. Positive changes in depression, anxiety, fatigue, and tension were observed after the eight-week exercise program. No deleterious effect on the health status was observed. These findings provide some evidences as to the feasibility of submitting individuals with RA to a modified dance-exercise program. Further studies, however, are required to determine the long-term effect of weight-bearing exercise on the health status of individuals with RA.

  20. Evaluation of scheduling techniques for payload activity planning

    NASA Technical Reports Server (NTRS)

    Bullington, Stanley F.

    1991-01-01

    Two tasks related to payload activity planning and scheduling were performed. The first task involved making a comparison of space mission activity scheduling problems with production scheduling problems. The second task consisted of a statistical analysis of the output of runs of the Experiment Scheduling Program (ESP). Details of the work which was performed on these two tasks are presented.

  1. Energy Economic Data Base (EEDB) Program. Phase III. Final report and third update

    SciTech Connect

    Crowley, J. H.; Allen, R. E.; Aklu, G. L.; Benedict, R. G.; Brown, P. E.; Hodson, J. S.; Kaminski, R. S.; Lee, N. H.; Marda, R. S.; Martin, R. J.; Molin, A. T.; Smith, M. H.; Sosnowicz, E. J.; Valorie, C. M.; Woodhull, A. S.; Ziegler, E. J.

    1981-07-01

    The objective of the USDOE EEDB Program is to provide periodic updates of technical and cost (capital, fuel and operating and maintenance) information of significance to the US Department of Energy. This information is intended to be used by USDOE in evauating and monitoring US civilian nuclear power programs, and to provide them with a consistent means of evaluating the nuclear option and proposed alternatives. The data tables, which make up the bulk of the report, are updated to January 1, 1980. The data in these tables and in the backup data file supercede the information presented in the Second Update (1979). Where required, new descriptive information is added in the text to supplement the data tables.

  2. MAKE OF BUY PROGRAM. M57A-1 STAGE III MINUTEMAN MOTOR

    DTIC Science & Technology

    Outlined is the Hercules Powder Company Make or Buy Program. Make or Buy decisions are arrived at after a comprehensive review and evaluation by...management of all known factors. Initially, decisions to make are formed upon the factors of facilities, manufacturing knowhow, adaptability, etc. After...formulating a decision of make from these factors, studies are then con ducted into the areas of unit cost, transportation, management control, etc

  3. The Oral History Program: III. Personal views of health sciences librarianship and the Medical Library Association.

    PubMed Central

    McKenzie, D; Pifalo, V

    1998-01-01

    The Medical Library Association Oral History Program uses accepted oral history techniques to collect and preserve interviews with members. The original taped interviews and transcripts are kept in the Medical Library Association archives and made available for research purposes; edited copies of the interviews are distributed through the National Network of Libraries of Medicine, and members are encouraged to borrow and read the histories. Summaries of forty-three interviews provide personal views on health sciences librarianship and the Medical Library Association. PMID:9803287

  4. The Hybrid Schedule: Scheduling to the Curriculum.

    ERIC Educational Resources Information Center

    Boarman, Gerald L.; Kirkpatrick, Barbara S.

    1995-01-01

    A series of experiments with single and double mod scheduling at a large suburban Maryland high school has led to a highly flexible schedule that meets teachers' and students' needs. This schedule allows courses to be offered in the most suitable format, creates more time for students and teachers, streamlines hallway traffic, and fosters a team…

  5. Safety with Ocrelizumab in Rheumatoid Arthritis: Results from the Ocrelizumab Phase III Program

    PubMed Central

    Emery, Paul; Rigby, William; Tak, Paul P.; Dörner, Thomas; Olech, Ewa; Martin, Carmen; Millar, Laurie; Travers, Helen; Fisheleva, Elena

    2014-01-01

    Objective The objective was to determine the safety of ocrelizumab (OCR) in patients with rheumatoid arthritis (RA). Methods This was an analysis of the double-blind, placebo-controlled periods and long-term follow-up of 4 OCR phase III trials in RA (SCRIPT, STAGE, FILM and FEATURE). Safety data per study and the results of a meta-analysis of serious infectious events (SIEs) are presented. Results Overall, 868 patients received placebo, 1064 patients OCR 200 mg×2 (or 400 mg×1) (OCR200), and 827 patients OCR 500 mg×2 (OCR500) plus background methotrexate (MTX) at baseline and 24 weeks. During the double-blind, placebo-controlled periods, the incidence of adverse events and serious adverse events was comparable between the OCR+MTX and placebo +MTX groups. Infusion-related reactions were more common with OCR+MTX and decreased in frequency with subsequent infusions. Serious infusion-related reactions were rare (0.1%). Serious infections occurred more frequently with OCR500+MTX. In the meta-analysis, a statistically significant difference from placebo +MTX in incidence of SIEs per 100 patient-years of 2.4 (95% CI, 0.3–4.5) was observed with OCR500+MTX, but not with OCR200+MTX (0.6; 95% CI, −1.3 to 2.4). Patients recruited in Asia exhibited a higher risk of serious infections (hazard ratio, 1.78; 95% CI, 1.03–3.06). The incidence of human anti-human antibodies was <5%. Long-term follow-up indicated no differences in malignancy rates between the treatment groups. There was no apparent difference in time to B-cell repletion between the OCR dose groups. Conclusions In placebo-controlled clinical trials of RA, OCR500+MTX was associated with a higher risk of serious infections compared with placebo +MTX. The safety profile of OCR 200+MTX was comparable with placebo+MTX. Trial Registration STAGE Clinical Trials.gov NCT00406419 SCRIPT Clinical Trials.gov NCT00476996 FILM Clinical Trials.gov NCT00485589 FEATURE Clinical Trials.gov NCT00673920 PMID:24498318

  6. The Effects of Management Initiatives on the Costs and Schedules of Defense Acquisition Programs. Volume 2. Analyses of Ground Combat and Ship Programs

    DTIC Science & Technology

    1992-11-01

    negotiate a sales agreement with Turkey, the missiles were ___ 1~2.~~____ _____ __ I handed over to a unit of the New Mexico National Guard, The unit was...87 End Date Sep-89 Sep-06 Sep-06 Qnanthy, N/A N/AN/ Program Status Development-Completed Prduction - -3 yas of data Note: N/A moans not applicable. d...Quantity 12 18 12 Cost $146.5 $337.2 $239.1 3 Total Program Cost $205.9 $443.0 $344.9 Average Unit Cost Prduction $12.2 $18,7 $13,3 Total Pmgrn $17.2 $24.6

  7. Iterative refinement scheduling

    NASA Technical Reports Server (NTRS)

    Biefeld, Eric

    1992-01-01

    We present a heuristics-based approach to deep space mission scheduling which is modeled on the approach used by expert human schedulers in producing schedules for planetary encounters. New chronological evaluation techniques are used to focus the search by using information gained during the scheduling process to locate, classify, and resolve regions of conflict. Our approach is based on the assumption that during the construction of a schedule there exist several disjunct temporal regions where the demand for one resource type or a single temporal constraint dominates (bottleneck regions). If the scheduler can identify these regions and classify them based on their dominant constraint, then the scheduler can select the scheduling heuristic.

  8. Users Speak Out: A Look at Six Administrative Software Programs.

    ERIC Educational Resources Information Center

    Bruder, Isabelle

    1988-01-01

    Reviews six microcomputer-based administrative software programs that handle scheduling, grade reporting, and attendance tasks: (1) Alpha II, (2) Harts III, (3) Mount Castor, (4) The Osiris System, (5) The School System, and (6) STARS (Student Academic Records System). Companies producing the programs, systems they run on, and price information…

  9. The Research Program at RIBRAS (Radioactive Ion Beams in Brasil)-III

    SciTech Connect

    Lichtenthaeler, R.; Lepine-Szily, A.; Guimaraes, V.; Faria, P. N. de; Mendes, D. R. Jr; Pires, K. C. C.; Morcelle, V.; Barioni, A.; Morais, M. C.; Pampa Condori, R.; Assuncao, M.; Moro, A. M.; Rodriguez-Gallardo, M.; Arazi, A.

    2010-04-30

    A part of the research program developed in the RIBRAS facility over the last four years is presented. Experiments using radioactive secondary beams of light exotic nuclei such as {sup 6}He, {sup 7}Be, {sup 8}Li on several targets have been performed. Elastic angular distributions have been analysed by the Optical Model and four body Continuous Discretized Coupled Channels Calculations (4b-CDCC) and the total reaction cross sections have been obtained. A comparison between the reaction cross sections of {sup 6}He and other stable projectiles with medium-heavy targets was performed. Measurements of the proton transfer reaction {sup 12}C({sup 8}Li,{sup 9}Be){sup 11}B are also presented.

  10. Tree canopy light interception estimates in almond and a walnut orchards using ground, low flying aircraft, and satellite based methods to improve irrigation scheduling programs.

    NASA Astrophysics Data System (ADS)

    Rosecrance, R. C.; Johnson, L.; Soderstrom, D.

    2016-12-01

    Canopy light interception is a main driver of water use and crop yield in almond and walnut production. Fractional green canopy cover (Fc) is a good indicator of light interception and can be estimated remotely from satellite using the normalized difference vegetation index (NDVI) data. Satellite-based Fc estimates could be used to inform crop evapotranspiration models, and hence support improvements in irrigation evaluation and management capabilities. Satellite estimates of Fc in almond and walnut orchards, however, need to be verified before incorporating them into irrigation scheduling or other crop water management programs. In this study, Landsat-based NDVI and Fc from NASA's Satellite Irrigation Management Support (SIMS) were compared with four estimates of canopy cover: 1. light bar measurement, 2. in-situ and image-based dimensional tree-crown analyses, 3. high-resolution NDVI data from low flying aircraft, and 4. orchard photos obtained via Google Earth and processed by an Image J thresholding routine. Correlations between the various estimates are discussed.

  11. Tree Canopy Light Interception Estimates in Almond and a Walnut Orchards Using Ground, Low Flying Aircraft, and Satellite Based Methods to Improve Irrigation Scheduling Programs

    NASA Technical Reports Server (NTRS)

    Rosecrance, Richard C.; Johnson, Lee; Soderstrom, Dominic

    2016-01-01

    Canopy light interception is a main driver of water use and crop yield in almond and walnut production. Fractional green canopy cover (Fc) is a good indicator of light interception and can be estimated remotely from satellite using the normalized difference vegetation index (NDVI) data. Satellite-based Fc estimates could be used to inform crop evapotranspiration models, and hence support improvements in irrigation evaluation and management capabilities. Satellite estimates of Fc in almond and walnut orchards, however, need to be verified before incorporating them into irrigation scheduling or other crop water management programs. In this study, Landsat-based NDVI and Fc from NASA's Satellite Irrigation Management Support (SIMS) were compared with four estimates of canopy cover: 1. light bar measurement, 2. in-situ and image-based dimensional tree-crown analyses, 3. high-resolution NDVI data from low flying aircraft, and 4. orchard photos obtained via Google Earth and processed by an Image J thresholding routine. Correlations between the various estimates are discussed.

  12. Medicare program; schedule of limits on hospital inpatient operating costs for cost reporting periods beginning on or after October 1, 1982--HCFA. Interim final notice with comment period.

    PubMed

    1982-09-30

    This notice sets forth a schedule of limits on the hospital inpatient operating costs that may be reimbursed under Medicare for cost reporting periods beginning on or after October 1, 1982. These limits are needed to implement changes in the Medicare law that were made by section 101(a) of Pub. L. 97-248, the Tax Equity and Fiscal Responsibility Act of 1982. The new limits differ from the current per diem limits on inpatient general routine operating costs in several major respects. First, they are not restricted to costs of inpatient general routine care, but cover total inpatient operating costs, including the costs of general routine service, special care, and ancillary services. The new limits will be applied on a cost per discharge rather than cost per diem basis. Finally, they are adjusted to reflect differences in the mix of Medicare cases treated by each hospital. The limits are similar to the current limits in that they do not apply to outpatient service cost, capital-related costs, malpractice insurance costs, or costs a hospital allocates to the interns and residents (in approved programs) or nursing school cost centers on its Medicare cost report. They also do not apply to children's hospitals, long-term care hospitals, or rural hospitals with fewer than 50 beds. The notice explains our methodology for deriving and applying the new limits.

  13. Medicare program; schedule of limits on home health agency costs per visit for cost reporting periods beginning on or after October 1, 1997--HCFA. Notice with comment period.

    PubMed

    1998-01-02

    This notice sets forth a revised schedule of limits on home health agency costs that may be paid under the Medicare program for cost reporting periods beginning on or after October 1, 1997. These limits replace the per visit limits that were set forth in our July 1, 1996 notice with comment period (61 FR 34344) and supersede those set forth in our July 1, 1997 notice with comment period (61 FR 35608). This notice also provides, in accordance with the Balanced Budget Act of 1997, that there be no changes in the home health per visit limits for cost reporting periods beginning on or after July 1, 1997 and before October 1, 1997 (that is, the cost limits set forth in our July 1, 1996 notice will apply to cost reporting periods beginning during this time period); that the establishment of the cost per visit limitations for cost reporting periods beginning on or after October 1, 1997 be based on 105 percent of the median of the labor-related and nonlabor per visit costs for freestanding home health agencies; that there be no updates in the home health costs limits (including no adjustments for changes in the wage index or other updates) for cost reporting periods beginning on or after July 1, 1994 and before July 1, 1996; and the wage index value that is applied to the labor portion of the per visit limitations be based on the geographic area in which the home health service is furnished.

  14. Scheduler's assistant: a tool for intelligent scheduling

    NASA Astrophysics Data System (ADS)

    Griffin, Neal L.

    1991-03-01

    The objective of this project was to use expert system technology to aid in the scheduling activities performed at the White Sands Missile Range (WSMR). The WSMR range scheduling problem presents a complex interactive environment. A human factors approach was undertaken, in that, the goal was to implement a system which mimics current WSMR scheduling procedures. The results of this project have produced a prototypic scheduling tool, called Scheduler's Assistant (SA), to aid WSMR range schedulers to generate a daily schedule. The system provides resource conflict detection and resolution advice through a series of cooperating expert systems. Immediate advantages of the system are increased safety, insurance of proper schedule execution and improved speed for turnaround time of sudden schedule changes. Additional benefits of SA include: expandability as future operations grow, allows for rapid redeployment for changing resources, promotes efficient management of WSMR resources, provides a formal representation of knowledge such that years of range personnel experience is preserved and enables the flexibility of a scheduling aid as opposed to a rigid methodology. Prior development efforts by Perceptics have produced a sophisticated expert system development tool, called Knowledge Shaper, which was used to implement all of the expert systems. The development of SA included a library of routines (the SA toolbox) to permit the manipulation of internal data tables and define a data transfer protocol to and from the SA environment. The combination of Knowledge Shaper and the SA toolbox provide a powerful set of design tools for the development of future scheduling applications.

  15. Future aircraft networks and schedules

    NASA Astrophysics Data System (ADS)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  16. Economic assessment of central cancer registry operations, Part III: Results from 5 programs.

    PubMed

    Tangka, Florence; Subramanian, Sujha; Beebe, Maggie Cole; Trebino, Diana; Michaud, Frances

    2010-01-01

    In this article, we report results from the cost analysis of 5 central cancer registries funded by the National Program of Cancer Registries (NPCR). To estimate the true economic costs of operating a cancer registry, we used a cost-assessment tool (CAT) to collect data on all registry activities, not just those funded by the NPCR. Data were collected on actual, rather than budgeted, expenditures, including personnel, consultants, information technology (IT) support, and other factors influencing costs. Factors that can affect registry costs include the amount of consolidation from abstract to incident cases, the method of data reporting, the number of edits that must be performed manually versus electronically, and the amount of interstate data exchange required of a registry. Expenditures were allocated to specific surveillance and data enhancement and analysis activities. Our study confirmed that cost per case varies across registry activities. The cost of surveillance activities per case ranges from $24.79 to $95.78 while the cost of data enhancement and analysis registry activities per reported cancer case ranges from $2.91 to $9.32. Total cost per reported cancer case also varies, ranging from $30 to slightly more than $100, with a median of $45.84. Further research using data from all NPCR-funded registries is required to assess reasons for this variation. Information gained from such an assessment will improve efficiency in registry operations and provide data to better quantify the funding requirements for expanding registry activities.

  17. Innovative integration of decommissioning and deactivation program with soil-groundwater clean up program has positive results on budget and schedule: a case study

    SciTech Connect

    Schappell, Bruce G.; Rucker, Gregory G.

    2007-07-01

    An innovative approach to integrate the activities of a decommissioning and deactivation program (D and D) with a soil-groundwater clean up program has had significant positive results saving both money and time at the Department of Energy's Savannah River Site. The accomplishments that have been achieved by the combining the two programs have been remarkable including significant cost savings, economies of scale for sampling and document generation, and alignment of common objectives. Because of the coordination of both activities area-wide 'end states' can be formulated and be consistent with the customers' cleanup goals and federal regulations. This coordinates and aligns both the environmental clean up and D and D objectives because each must be addressed simultaneously and comprehensively. In this respect, resources from both organizations can be pooled to take advantage of the strengths of each. The new approach allows more efficient use of lean financial resources and optimizes workforce activities to attain the common objectives while being more cost effective, more protective of the environment, and optimizing the use existing resources. (authors)

  18. Innovative Integration of Decommissioning and Deactivation Program with Soil-Groundwater Clean Up Program Has Positive Results on Budget and Schedule: A Case Study

    SciTech Connect

    Schappell, B; Rucker, G

    2007-07-25

    An innovative approach to integrate the activities of a decommissioning and deactivation program (D&D) with a soil-groundwater clean up program has had significant positive results saving both money and time at the Department of Energy's Savannah River Site. The accomplishments that have been achieved by the combining the two programs have been remarkable including significant cost savings, economies of scale for sampling and document generation, and alignment of common objectives. Because of the coordination of both activities area-wide ''end states'' can be formulated and be consistent with the customers' cleanup goals and federal regulations. This coordinates and aligns both the environmental clean up and D&D objectives because each must be addressed simultaneously and comprehensively. In this respect, resources from both organizations can be pooled to take advantage of the strengths of each. The new approach allows more efficient use of lean financial resources and optimizes workforce activities to attain the common objectives while being more cost effective, more protective of the environment, and optimizing the use existing resources.

  19. Characterization by temperature-programmed reduction and by temperature-programmed oxidation (TPR-TPO) of chromium (III) oxide-based catalysts: Correlation with the catalytic activity for hydrofluoroalkane synthesis

    SciTech Connect

    Brunet, S.; Requieme, B.; Matouba, E.; Barrault, J.; Blanchard, M.

    1995-03-01

    The catalytic activity of chromium (III) oxide for the fluorination of CF{sub 3}CH{sub 2}Cl (HCFC 133a) is proportional to the number of reversibly oxidized sites. The proportionality coefficient depends on the atmosphere employed during the pretreatment of the catalyst. The temperature-programmed reduction and temperature-programmed oxidation experiments constitute a simple technique that allows the number of reversibly oxidized chromium atoms to be measured. The method of preparation of the chromium hydroxide has little effect on the catalytic properties of chromium (III) oxide. The activation atmosphere and the temperature are essential parameters in the formation of chromium (III) oxide from hydroxide. Indeed, the most active chromium (III) oxide for the fluorination of CF{sub 3}CH{sub 2}Cl is obtained by thermal treatment of hydroxide at 380{degrees}C under nitrogen. 20 refs., 5 figs., 4 tabs.

  20. Helping General Physical Educators and Adapted Physical Educators Address the Office of Civil Rights Dear Colleague Guidance Letter: Part III--Practitioners and Programs

    ERIC Educational Resources Information Center

    Poulin, David; Martinez, David; Aenchbacher, Amy; Aiello, Rocco; Doyle, Mike; Hilgenbrinck, Linda; Busse, Sean; Cappuccio, Jim

    2013-01-01

    In Part III of the feature, physical educators and adapted physical educators offer current best practices as models of implementation for readers. Contributions included are: (1) Answer to the Dear Colleague Letter from the Anchorage School District's Adapted Sport Program (David Poulin); (2) Georgia's Adapted Physical Educators Response to the…

  1. A Standardized Certification Program for Case Managers Serving Frail Elderly Texans. Module III: Implementation, Monitoring, Reassessment & Care Plan Adjustment, Closure, and Evaluation.

    ERIC Educational Resources Information Center

    Lusky, Richard A.; And Others

    This learning module is one of three training modules that were developed for members of the Texas Gerontological Consortium for Continuing Education to use in preparing case managers working in human service professions coordinating community-based programs for frail elderly Texans. Module III deals with the following topics: implementation (case…

  2. Helping General Physical Educators and Adapted Physical Educators Address the Office of Civil Rights Dear Colleague Guidance Letter: Part III--Practitioners and Programs

    ERIC Educational Resources Information Center

    Poulin, David; Martinez, David; Aenchbacher, Amy; Aiello, Rocco; Doyle, Mike; Hilgenbrinck, Linda; Busse, Sean; Cappuccio, Jim

    2013-01-01

    In Part III of the feature, physical educators and adapted physical educators offer current best practices as models of implementation for readers. Contributions included are: (1) Answer to the Dear Colleague Letter from the Anchorage School District's Adapted Sport Program (David Poulin); (2) Georgia's Adapted Physical Educators Response to the…

  3. The Stratospheric Aerosol and Gas Experiment III instrument proposed for EOS - A conceptual design

    NASA Technical Reports Server (NTRS)

    Mauldin, L. E.; Mccormick, M. P.; Zawodny, J. M.; Mcmaster, L. R.; Chu, W. P.; Gustafson, J. C.; Maddrea, G. L.

    1989-01-01

    This paper describes the Stratospheric Aerosol and Gas Experiment III (SAGE III) instrument proposed for the Earth Observing System (EOS), which is designed to monitor the vertical distribution of stratospheric aerosols, ozone, water vapor, nitrogen dioxide, and temperature by measuring the extinction and scattering of solar radiation in the 03 to 1.6 micron range through the atmosphere. The SAGE III employs proven concepts which have evolved from the SAM II, SAGE, and SAGE II programs. The launch is scheduled for the summer of 1996. The SAGE II block diagram is included.

  4. The Serendipitous Extragalactic X-Ray Source Identification (SEXSI) Program. III. Optical Spectroscopy

    NASA Astrophysics Data System (ADS)

    Eckart, Megan E.; Stern, Daniel; Helfand, David J.; Harrison, Fiona A.; Mao, Peter H.; Yost, Sarah A.

    2006-07-01

    We present the catalog of 477 spectra from the Serendipitous Extragalactic X-ray Source Identification (SEXSI) program, a survey designed to probe the dominant contributors to the 2-10 keV cosmic X-ray background. Our survey covers 1 deg2 of sky to 2-10 keV fluxes of 1×10-14 ergs cm-2 s-1, and 2 deg2 for fluxes of 3×10-14 ergs cm-2 s-1. Our spectra reach to R-band magnitudes of <~24 and have produced identifications and redshifts for 438 hard X-ray sources. Typical completeness levels in the 27 Chandra fields studied are 40%-70%. The vast majority of the 2-10 keV selected sample are active galactic nuclei (AGNs) with redshifts between 0.1 and 3; our highest redshift source lies at z=4.33. We find that few sources at z<1 have high X-ray luminosities, reflecting a dearth of high-mass, high-accretion-rate sources at low redshift, a result consistent with other recent wide-area surveys. We find that half of our sources show significant obscuration, with NH>1022 cm-2, independent of unobscured luminosity. We classify 168 sources as emission-line galaxies; all are X-ray-luminous (LX>1041 ergs s-1) objects with optical spectra lacking both high-ionization lines and evidence of a nonstellar continuum. The redshift distribution of these emission-line galaxies peaks at a significantly lower redshift than does that of the sources we spectroscopically identify as AGNs. We conclude that few of these sources, even at the low-luminosity end, can be powered by starburst activity. Stacking spectra for a subset of these sources in a similar redshift range, we detect [Ne V] λ3426 emission, a clear signature of AGN activity, confirming that the majority of these objects are Seyfert 2 galaxies in which the high-ionization lines are diluted by stellar emission. We find a total of 33 objects lacking broad lines in their optical spectra that have quasar X-ray luminosities (LX>1044 ergs s-1), the largest sample of such objects identified to date. In addition, we explore 17 AGNs

  5. Protocols for distributive scheduling

    NASA Technical Reports Server (NTRS)

    Richards, Stephen F.; Fox, Barry

    1993-01-01

    The increasing complexity of space operations and the inclusion of interorganizational and international groups in the planning and control of space missions lead to requirements for greater communication, coordination, and cooperation among mission schedulers. These schedulers must jointly allocate scarce shared resources among the various operational and mission oriented activities while adhering to all constraints. This scheduling environment is complicated by such factors as the presence of varying perspectives and conflicting objectives among the schedulers, the need for different schedulers to work in parallel, and limited communication among schedulers. Smooth interaction among schedulers requires the use of protocols that govern such issues as resource sharing, authority to update the schedule, and communication of updates. This paper addresses the development and characteristics of such protocols and their use in a distributed scheduling environment that incorporates computer-aided scheduling tools. An example problem is drawn from the domain of space shuttle mission planning.

  6. SUPERSTARS III: K-2.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Education, Raleigh.

    SUPERSTARS III is a K-8 program designed as an enrichment opportunity for self-directed learners in mathematics. The basic purpose of SUPERSTARS III is to provide the extra challenge that self-motivated students need in mathematics and to do so in a structured, long-term program that does not impinge on the normal classroom routine or the…

  7. Simplifying Facility and Event Scheduling: Saving Time and Money.

    ERIC Educational Resources Information Center

    Raasch, Kevin

    2003-01-01

    Describes a product called the Event Management System (EMS), a computer software program to manage facility and event scheduling. Provides example of the school district and university uses of EMS. Describes steps in selecting a scheduling-management system. (PKP)

  8. Simplifying Facility and Event Scheduling: Saving Time and Money.

    ERIC Educational Resources Information Center

    Raasch, Kevin

    2003-01-01

    Describes a product called the Event Management System (EMS), a computer software program to manage facility and event scheduling. Provides example of the school district and university uses of EMS. Describes steps in selecting a scheduling-management system. (PKP)

  9. Evolution of carfilzomib dose and schedule in patients with multiple myeloma: a historical overview.

    PubMed

    Jakubowiak, Andrzej J

    2014-07-01

    Carfilzomib is a proteasome inhibitor that binds selectively and irreversibly to its target. In July 2012, carfilzomib received accelerated approval in the United States for the treatment of relapsed and refractory multiple myeloma. Based on emerging preclinical data and clinical results, the total dose, infusion time, and administration schedule of carfilzomib have evolved during phase I and phase II clinical studies, with the aim of optimizing the risk-benefit profile of the agent. Based on in vitro and in vivo findings and encouraging phase I tolerability data, a consecutive-day, twice-weekly dosing schedule was implemented early in the development program. Other phase II studies have led to further refinements in the dosing schedule of carfilzomib, resulting in the current approved schedule for carfilzomib to be administered intravenously over 2-10 min on 2 consecutive days each week for 3 weeks of a 28-day cycle. Prolonged infusion over 30 min has also been assessed in clinical studies to enable the use of higher carfilzomib doses with the aim of improving drug tolerability and efficacy. These data collectively informed the dosing and scheduling schemas for carfilzomib in ongoing trials, including phase I and II studies of combination regimens, and the randomized phase III trials ASPIRE, FOCUS, ENDEAVOR, and CLARION. Additional studies are underway to examine alternative dosing schedules (e.g., once-weekly dosing [CHAMPION-1]).

  10. Integrated online job-shop scheduling system

    NASA Astrophysics Data System (ADS)

    Zhao, Xing; Chen, Kuan H.; Luh, Peter B.; Chiueh, T. D.; Chang, ShihChang; Thakur, Lakshman S.

    1999-11-01

    The rapid development of information technology and e- commerce requires fast response form scheduling systems. Based on the Lagrangian relaxation approach for job shop scheduling, this paper present an integrated system that will generate schedules quickly. The Lagrangian relaxation approach is an iterative optimization process, where dynamic programming is solved in each iteration. Since dynamic programming is computational expensive especially for large problems, this paper develops the simplified dynamic programming, which will cut the computation time of each iteration by one order. Furthermore, a digital circuit to be embedded in PC is designed to implement the iterative optimization algorithm, leading to another order of speed improvement. The resulting integrated scheduling system consists of the hardware for optimization and the related software. It is estimated that two orders of magnitude gain in speed can be obtained, which will make on-line scheduling for practical job shops possible.

  11. 29 CFR 1952.361 - Developmental schedule.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS New Mexico § 1952.361 Developmental schedule. The New Mexico State Plan is developmental. The following is the developmental schedule as... Mexico Occupational Health and Safety Review Commission by January 31, 1976. (d) Enforcement program...

  12. 40 CFR 52.134 - Compliance schedules.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Compliance schedules. 52.134 Section 52.134 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Arizona § 52.134 Compliance schedules. (a) Federal...

  13. 40 CFR 52.134 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Compliance schedules. 52.134 Section 52.134 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Arizona § 52.134 Compliance schedules. (a) Federal...

  14. 40 CFR 52.134 - Compliance schedules.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Compliance schedules. 52.134 Section 52.134 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Arizona § 52.134 Compliance schedules. (a) Federal...

  15. 40 CFR 52.134 - Compliance schedules.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Compliance schedules. 52.134 Section 52.134 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Arizona § 52.134 Compliance schedules. (a) Federal...

  16. 6 CFR 27.210 - Submissions schedule.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Submissions schedule. 27.210 Section 27.210 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.210 Submissions schedule. (a) Initial Submission....

  17. 6 CFR 27.210 - Submissions schedule.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 6 Domestic Security 1 2014-01-01 2014-01-01 false Submissions schedule. 27.210 Section 27.210 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.210 Submissions schedule. (a) Initial Submission....

  18. 40 CFR 52.524 - Compliance schedule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Compliance schedule. 52.524 Section 52.524 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Florida § 52.524 Compliance schedule. (a) The information...

  19. 40 CFR 52.240 - Compliance schedules.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Compliance schedules. 52.240 Section 52.240 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.240 Compliance schedules. (a)...

  20. 40 CFR 52.626 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Compliance schedules. 52.626 Section 52.626 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.626 Compliance schedules. (a) (b) The...

  1. 40 CFR 52.626 - Compliance schedules.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Compliance schedules. 52.626 Section 52.626 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.626 Compliance schedules. (a) (b) The...

  2. 40 CFR 52.626 - Compliance schedules.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Compliance schedules. 52.626 Section 52.626 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.626 Compliance schedules. (a) (b) The...

  3. 40 CFR 52.626 - Compliance schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Compliance schedules. 52.626 Section 52.626 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.626 Compliance schedules. (a) (b) The...

  4. 40 CFR 52.626 - Compliance schedules.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Compliance schedules. 52.626 Section 52.626 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.626 Compliance schedules. (a) (b) The...

  5. 49 CFR 665.21 - Scheduling.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... TRANSPORTATION BUS TESTING Operations § 665.21 Scheduling. (a) To schedule a bus for testing, a manufacturer shall contact the operator of FTA's bus testing program. Contact information and procedures are available on the operator's bus testing Web site, http://www.altoonabustest.com. (b) Upon contacting...

  6. 49 CFR 665.21 - Scheduling.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... TRANSPORTATION BUS TESTING Operations § 665.21 Scheduling. (a) To schedule a bus for testing, a manufacturer shall contact the operator of FTA's bus testing program. Contact information and procedures are available on the operator's bus testing Web site, http://www.altoonabustest.com. (b) Upon contacting...

  7. 49 CFR 665.21 - Scheduling.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... TRANSPORTATION BUS TESTING Operations § 665.21 Scheduling. (a) To schedule a bus for testing, a manufacturer shall contact the operator of FTA's bus testing program. Contact information and procedures are available on the operator's bus testing Web site, http://www.altoonabustest.com. (b) Upon contacting...

  8. 49 CFR 665.21 - Scheduling.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... TRANSPORTATION BUS TESTING Operations § 665.21 Scheduling. (a) To schedule a bus for testing, a manufacturer shall contact the operator of FTA's bus testing program. Contact information and procedures are available on the operator's bus testing Web site, http://www.altoonabustest.com. (b) Upon contacting...

  9. 49 CFR 665.21 - Scheduling.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... TRANSPORTATION BUS TESTING Operations § 665.21 Scheduling. (a) To schedule a bus for testing, a manufacturer shall contact the operator of FTA's bus testing program. Contact information and procedures are available on the operator's bus testing Web site, http://www.altoonabustest.com. (b) Upon contacting...

  10. 33 CFR 242.6 - Fee schedule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... MANAGEMENT SERVICES PROGRAM ESTABLISHMENT OF FEES FOR COST RECOVERY § 242.6 Fee schedule. (a) General. The... Services requiring more than ten minutes and up to one work day to provide. The Fee Schedule has been... total costs for services provided to Federal agencies and private persons. (b) Level of effort....

  11. 40 CFR 63.1291 - Compliance schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... for Hazardous Air Pollutants for Flexible Polyurethane Foam Production § 63.1291 Compliance schedule... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Compliance schedule. 63.1291 Section 63.1291 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED...

  12. 40 CFR 52.1524 - Compliance schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Compliance schedules. 52.1524 Section 52.1524 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Hampshire § 52.1524 Compliance schedules...

  13. 33 CFR 242.6 - Fee schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... based on a Corps-wide average of estimated current costs for providing that level of service. (f) Review... most current cost data available. If necessary, the Fee Schedule will be revised after public notice... MANAGEMENT SERVICES PROGRAM ESTABLISHMENT OF FEES FOR COST RECOVERY § 242.6 Fee schedule. (a) General....

  14. 40 CFR 52.1482 - Compliance schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Compliance schedules. 52.1482 Section 52.1482 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Nevada § 52.1482 Compliance schedules....

  15. 40 CFR 52.1482 - Compliance schedules.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 4 2014-07-01 2014-07-01 false Compliance schedules. 52.1482 Section 52.1482 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Nevada § 52.1482 Compliance schedules....

  16. 40 CFR 52.1482 - Compliance schedules.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 4 2013-07-01 2013-07-01 false Compliance schedules. 52.1482 Section 52.1482 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Nevada § 52.1482 Compliance schedules....

  17. 40 CFR 52.1482 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Compliance schedules. 52.1482 Section 52.1482 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Nevada § 52.1482 Compliance schedules....

  18. BIW Phase III/FY-82 Shipyard Data Application Program Panel Line/Shop Scheduling and Manloading Incentive System Evaluation (Welding)

    DTIC Science & Technology

    1983-01-01

    FIT-GANTRY WITH CLIMB-STEP PF 2 ( 5 ) Al B6 G3 A196( B10 )P1 AO (2) 1.00 2270 . PUSH BUTTON AT SEAM-FIT-GANTRY F 2.PT 1 S AND TURN POWER ON / OFF Al...TORCH; DESLAG, OPERATION DOES NOT ALLOW BURNER SET-UP OR GETTING TORCH TO JOB, TOTAL TMU 5004. 1019. MOVE WEB FRAME ON (PANEL) UNIT WITH (KING WEB) CLAMP...FROM WEST WALL NEAR UNIT TO UNIT WITH2 STEPS Al B10 G3 A3 BO P1 AO 1.00 180. MANEUVER SEMIAUTO-GUN AT UNIT ( UNCOIL OFF WIRE FEEDER ) Al B0 G1 M10 X0 I0

  19. Medicare program; schedules of per-visit and per-beneficiary limitations on home health agency costs for cost reporting periods beginning on or after October 1, 1998--HCFA. Notice with comment period.

    PubMed

    1998-08-11

    This notice with comment period sets forth revised schedules of limitations on home health agency costs that may be paid under the Medicare program for cost reporting periods beginning on or after October 1, 1998. These limitations replace the limitations that were set forth in our January 2, 1998 notice with comment period (63 FR 89) and our March 31, 1998 final rule with comment period (63 FR 15718).

  20. Medicare program; schedule of per-beneficiary limitations on home health agency costs for cost reporting periods beginning on or after October 1, 1997--HCFA. Final rule with comment period.

    PubMed

    1998-03-31

    This final rule with comment period sets forth, in accordance with section 4602 of the Balanced Budget Act of 1997, a new schedule of limitations on home health agency costs that may be paid under the Medicare program for cost reporting periods beginning on or after October 1, 1997. These limitations are in addition to the per-visit limitations that were set forth in our January 2, 1998 notice with comment period.

  1. Medicare program; schedule of limits on home health agency costs per visit for cost reporting periods beginning on or after July 1, 1992; correction--HCFA. Notice with comment period; correction.

    PubMed

    1992-09-17

    In the July 1, 1992 issue of the Federal Register (FR Doc. 92-15496) (57 FR 29410), we published a notice with comment period that set forth a revised schedule of limits on home health agency costs that may be paid under the Medicare program. The July 1, 1992 notice applies to cost reporting periods beginning on or after July 1, 1992. This notice corrects errors made in the July 1, 1992 document.

  2. The reliability of the National Cholesterol Education Program's Adult Treatment Panel III (NCEP/ATP III) and the International Diabetes Federation (IDF) definitions in diagnosing metabolic syndrome (MetS) among Gaza Strip Palestinians.

    PubMed

    Sirdah, Mahmoud M; Abu Ghali, Asmaa S; Al Laham, Nahed A

    2012-01-01

    Metabolic syndrome (MetS) which is a multifaceted syndrome, has been demonstrated as a common precursor for developing cardiovascular diseases and/or type 2 diabetes mellitus. Different diagnostic definitions for MetS have been proposed and recommended. We set up to evaluate the reliabilities of the National Cholesterol Education Program's Adult Treatment Panel III (NCEP/ATP III) and the International Diabetes Federation (IDF) definitions in diagnosing MetS among Gaza Strip Palestinians. This cross sectional study involved a randomly selected two hundred and thirty apparently healthy adults from the Gaza Strip. Anthropometric measurements, blood pressure, fasting plasma glucose, lipid profile, and questionnaire interviews were performed. The overall prevalence of MetS in our Gaza Strip cohort was 23.0% and 39.5% according to NCEP/ATP III and IDF definitions respectively (p<0.001). No significant differences were seen in the number of MetS components in individuals having MetS by either definition (mean 3.42 ± 0.63 vs 3.52 ± 0.69 respectively, p=0.865). Both IDF and NCEP/ATP III showed an increased prevalence of MetS with age, and body mass index (BMI), however they revealed different prevalence trends with sex. Except for BMI, there were no significant differences in the general and metabolic related characteristics between subjects with MetS of IDF and NCEP/ATP III definitions. Independently of the definition used, MetS is highly prevalent in Gaza Strip population, with a steady increase in MetS prevalence through age and BMI. The IDF definition tends to give higher values for MetS prevalence, and therefore could be more appropriate for diagnosing MetS in Gaza Strip cohort. Copyright © 2012 Diabetes India. Published by Elsevier Ltd. All rights reserved.

  3. Job Scheduling Under the Portable Batch System

    NASA Technical Reports Server (NTRS)

    Henderson, Robert L.; Woodrow, Thomas S. (Technical Monitor)

    1995-01-01

    The typical batch queuing system schedules jobs for execution by a set of queue controls. The controls determine from which queues jobs may be selected. Within the queue, jobs are ordered first-in, first-run. This limits the set of scheduling policies available to a site. The Portable Batch System removes this limitation by providing an external scheduling module. This separate program has full knowledge of the available queued jobs, running jobs, and system resource usage. Sites are able to implement any policy expressible in one of several procedural language. Policies may range from "bet fit" to "fair share" to purely political. Scheduling decisions can be made over the full set of jobs regardless of queue or order. The scheduling policy can be changed to fit a wide variety of computing environments and scheduling goals. This is demonstrated by the use of PBS on an IBM SP-2 system at NASA Ames.

  4. Job Scheduling Under the Portable Batch System

    NASA Technical Reports Server (NTRS)

    Henderson, Robert L.; Woodrow, Thomas S. (Technical Monitor)

    1995-01-01

    The typical batch queuing system schedules jobs for execution by a set of queue controls. The controls determine from which queues jobs may be selected. Within the queue, jobs are ordered first-in, first-run. This limits the set of scheduling policies available to a site. The Portable Batch System removes this limitation by providing an external scheduling module. This separate program has full knowledge of the available queued jobs, running jobs, and system resource usage. Sites are able to implement any policy expressible in one of several procedural language. Policies may range from "bet fit" to "fair share" to purely political. Scheduling decisions can be made over the full set of jobs regardless of queue or order. The scheduling policy can be changed to fit a wide variety of computing environments and scheduling goals. This is demonstrated by the use of PBS on an IBM SP-2 system at NASA Ames.

  5. Medicare program; end-stage renal disease prospective payment system and quality incentive program; ambulance fee schedule; durable medical equipment; and competitive acquisition of certain durable medical equipment prosthetics, orthotics and supplies. Final rule.

    PubMed

    2011-11-10

    This final rule updates and makes certain revisions to the End-Stage Renal Disease (ESRD) prospective payment system (PPS) for calendar year (CY) 2012. We are also finalizing the interim final rule with comment period published on April 6, 2011, regarding the transition budget-neutrality adjustment under the ESRD PPS,. This final rule also sets forth requirements for the ESRD quality incentive program (QIP) for payment years (PYs) 2013 and 2014. In addition, this final rule revises the ambulance fee schedule regulations to conform to statutory changes. This final rule also revises the definition of durable medical equipment (DME) by adding a 3-year minimum lifetime requirement (MLR) that must be met by an item or device in order to be considered durable for the purpose of classifying the item under the Medicare benefit category for DME. Finally, this final rule implements certain provisions of section 154 of the Medicare Improvements for Patients and Providers Act of 2008 (MIPPA) related to the durable medical equipment, prosthetics, orthotics and supplies (DMEPOS) Competitive Acquisition Program and responds to comments received on an interim final rule published January 16, 2009, that implemented these provisions of MIPPA effective April 18, 2009. (See the Table of Contents for a listing of the specific issues addressed in this final rule.)

  6. Intellectual classification of Black and White children in special education programs using the WISC-III and the Cognitive Assessment System.

    PubMed

    Naglieri, J A; Rojahn, J

    2001-07-01

    The Wechsler Intelligence Scale for Children--Third Edition and the Cognitive Assessment System were compared for a sample of 78 White and Black students in special education programs for children with mental retardation. Results showed that the WISC-III identified more children as having mental retardation than did the Cognitive Assessment System. More important, however, the WISC-III classified disproportionately more Blacks than Whites as having mental retardation as compared to the Cognitive Assessment System. Results imply that the problem of disproportionate representation of Black children in special education classes for children with mental retardation may be addressed if the Cognitive Assessment System were used instead of the WISC-III.

  7. Dedicated heterogeneous node scheduling including backfill scheduling

    DOEpatents

    Wood, Robert R.; Eckert, Philip D.; Hommes, Gregg

    2006-07-25

    A method and system for job backfill scheduling dedicated heterogeneous nodes in a multi-node computing environment. Heterogeneous nodes are grouped into homogeneous node sub-pools. For each sub-pool, a free node schedule (FNS) is created so that the number of to chart the free nodes over time. For each prioritized job, using the FNS of sub-pools having nodes useable by a particular job, to determine the earliest time range (ETR) capable of running the job. Once determined for a particular job, scheduling the job to run in that ETR. If the ETR determined for a lower priority job (LPJ) has a start time earlier than a higher priority job (HPJ), then the LPJ is scheduled in that ETR if it would not disturb the anticipated start times of any HPJ previously scheduled for a future time. Thus, efficient utilization and throughput of such computing environments may be increased by utilizing resources otherwise remaining idle.

  8. Student Perceptions of Block Scheduling in a New York State Public High School.

    ERIC Educational Resources Information Center

    Thomas, Cheryl; O'Connell, Raymond W.

    This study examined rural high school students' perceptions of block scheduling. During the third year of a block scheduling program, juniors and seniors who had experienced both traditional and block schedules completed surveys that asked for their perceptions of scheduling and its effects on them before and after block scheduling. The questions…

  9. Environmental surveillance master sampling schedule

    SciTech Connect

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington.

  10. Interference Cognizant Network Scheduling

    NASA Technical Reports Server (NTRS)

    Varadarajan, Srivatsan (Inventor); Hall, Brendan (Inventor); Smithgall, William Todd (Inventor); Bonk, Ted (Inventor); DeLay, Benjamin F. (Inventor)

    2017-01-01

    Systems and methods for interference cognizant network scheduling are provided. In certain embodiments, a method of scheduling communications in a network comprises identifying a bin of a global timeline for scheduling an unscheduled virtual link, wherein a bin is a segment of the timeline; identifying a pre-scheduled virtual link in the bin; and determining if the pre-scheduled and unscheduled virtual links share a port. In certain embodiments, if the unscheduled and pre-scheduled virtual links don't share a port, scheduling transmission of the unscheduled virtual link to overlap with the scheduled transmission of the pre-scheduled virtual link; and if the unscheduled and pre-scheduled virtual links share a port: determining a start time delay for the unscheduled virtual link based on the port; and scheduling transmission of the unscheduled virtual link in the bin based on the start time delay to overlap part of the scheduled transmission of the pre-scheduled virtual link.

  11. 40 CFR 141.702 - Sampling schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 141.702 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Enhanced Treatment for Cryptosporidium Source Water Monitoring Requirements § 141.702 Sampling schedules. (a) Systems required to conduct source water...

  12. 40 CFR 141.702 - Sampling schedules.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 141.702 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Enhanced Treatment for Cryptosporidium Source Water Monitoring Requirements § 141.702 Sampling schedules. (a) Systems required to conduct source water monitoring...

  13. 40 CFR 141.702 - Sampling schedules.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 141.702 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Enhanced Treatment for Cryptosporidium Source Water Monitoring Requirements § 141.702 Sampling schedules. (a) Systems required to conduct source water monitoring...

  14. 40 CFR 141.702 - Sampling schedules.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 141.702 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Enhanced Treatment for Cryptosporidium Source Water Monitoring Requirements § 141.702 Sampling schedules. (a) Systems required to conduct source water monitoring...

  15. 40 CFR 141.702 - Sampling schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 141.702 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Enhanced Treatment for Cryptosporidium Source Water Monitoring Requirements § 141.702 Sampling schedules. (a) Systems required to conduct source water monitoring...

  16. The Basic Program of Vocational Agriculture in Louisiana. Ag I and Ag II (9th and 10th Grades). Volume III. Bulletin 1690-III.

    ERIC Educational Resources Information Center

    Louisiana State Dept. of Education, Baton Rouge. Div. of Vocational Education.

    This curriculum guide, the third volume of the series, outlines the basic program of vocational agriculture for Louisiana students in the ninth and tenth grades. Covered in the five units on plant science are growth processes of plants, cultural practices for plants, insects affecting plants, seed and plant selection, and diseases that affect…

  17. Environmental surveillance master sampling schedule

    SciTech Connect

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  18. Clean Air Act Title III accidental emission release risk management program, and how it applies to landfills

    SciTech Connect

    Hibbard, C.S.

    1999-07-01

    On June 20, 1996, EPA promulgated regulations pursuant to Title III of the Clean Air Act (CAA) Amendments of 1990 (Section 112(r)(7) of the CAA). The rule, contained in 40 CFR Part 68, is called Accidental Release Prevention Requirements: Risk Management Programs, and is intended to improve accident prevention and emergency response practices at facilities that store and/or use hazardous substances. Methane is a designated highly hazardous chemical (HHC) under the rule. The rule applies to facilities that have 10,000 pounds of methane or more in any process, roughly equivalent to about 244,000 cubic feet of methane. The US EPA has interpreted this threshold quantity as applying to landfill gas within landfills. This paper presents an overview of the Accidental Release Prevention regulations, and how landfills are affected by the requirements. This paper describes methodologies for calculating the threshold quantity of landfill gas in a landfill. Methane is in landfill gas as a mixture. Because landfill gas can burn readily, down to concentrations of about five percent methane, the entire landfill gas mixture must be treated as the regulated substance, and counts toward the 10,000-pound threshold. It is reasonable to assume that the entire landfill gas collection system, active or passive, is filled with landfill gas, and that a calculation of the volume of the system would be a calculation of the landfill gas present in the process on the site. However, the US EPA has indicated that there are some instances in which pore space gas should be included in this calculation. This paper presents methods available to calculate the amount of pore space gas in a landfill, and how to determine how much of that gas might be available for an explosion. The paper goes through how to conduct the release assessment to determine the worst-case hazard zone around the landfill.

  19. Scheduling Coast Guard District Cutters

    DTIC Science & Technology

    1992-09-01

    2G, B-2NY, B-2SAR, C); t - week the cutter assumes the patrol status. COSTO - cost of scheduling cutter i to patrol k; ( 1 if ship i is available for...29262a tII 1 ’• l1 1i ,1111’Iii 1 l l H I ,,,,,,,•~II ,, I.,,,.,,_ I 111 ............ ll Unclassified SECURITY CLASSIFICATION OF THIS PAGE REPORT...Postgraduate School (If applicable) Naval Postgraduate School 1 55 6c. ADDRESS (City, State, and ZIP Code) 7b. ADDRESS (City, State, and ZIP Code) Monterey

  20. Prevalence of Metabolic Syndrome among Korean Adolescents According to the National Cholesterol Education Program, Adult Treatment Panel III and International Diabetes Federation

    PubMed Central

    Kim, Seonho; So, Wi-Young

    2016-01-01

    In both adults and children, metabolic syndrome (MetS) has been attributed to risk factors for type 2 diabetes and cardiovascular disease such as insulin resistance, abdominal obesity, hypertension, and dyslipidemia. This descriptive study aimed to compare the prevalence of MetS and diagnostic components according to the National Cholesterol Education Program, Adult Treatment Panel III (NCEP-ATP III) and International Diabetes Federation (IDF) in 2330 Korean adolescents (10–18 years), using data from the 2010–2012 Korea National Health and Nutrition Examination Survey-V. The NCEP-ATP III and IDF were used to diagnose MetS and yielded prevalence rates of 5.7% and 2.1%, respectively, with no sex-related differences. The most frequent MetS diagnostic components according to the NCEP-ATP III and IDF criteria were high triglyceride levels (21.2%) and low high-density lipoprotein cholesterol levels (13.6%), respectively; approximately 50.1% and 33.1% of adolescents had at least one MetS diagnostic component according to the respective criteria. Both overweight/obese male and female adolescents exhibited significantly increased prevalence rates of MetS and related diagnostic components, compared to normal-weight adolescents. In conclusion, the prevalence rates of MetS and diagnostic components differ according to the NCEP-ATP III and IDF criteria. Henceforth, efforts are needed to establish diagnostic criteria for Korean adolescents. PMID:27706073