76 FR 21722 - Combined Notice of Filings #1
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-18
... Notice of Cancellation of Reactive Power Rate Schedule. Filed Date: 04/07/2011. Accession Number...)(2)(iii): Revisions to the Tariff and OA re Emerg. Load Response Program ``Reporting'' to be... Reactive Rate Schedule Notice of Succession to be effective 3/9/2011. Filed Date: 04/07/2011. Accession...
DOT National Transportation Integrated Search
1981-10-01
This report presents an updated description of a vehicle simulation program, VEHSIM, which can determine the fuel economy and performance of a specified vehicle over a defined route as it executes a given driving schedule. Vehicle input accommodated ...
29 CFR 1401.36 - Freedom of Information Act fee schedules.
Code of Federal Regulations, 2014 CFR
2014-07-01
... for the purpose of conducting scientific research, the results of which are not intended to promote... for commercial use, but are sought in furtherance of scholarly or scientific research. (iii... institution of vocational education, which operates a program or programs of scholarly research. (7...
29 CFR 1401.36 - Freedom of Information Act fee schedules.
Code of Federal Regulations, 2013 CFR
2013-07-01
... for the purpose of conducting scientific research, the results of which are not intended to promote... for commercial use, but are sought in furtherance of scholarly or scientific research. (iii... institution of vocational education, which operates a program or programs of scholarly research. (7...
29 CFR 1401.36 - Freedom of Information Act fee schedules.
Code of Federal Regulations, 2011 CFR
2011-07-01
... scientific research, the results of which are not intended to promote any particular product or industry. (b... furtherance of scholarly or scientific research. (iii) Requesters who are representatives of the news media... education, which operates a program or programs of scholarly research. (7) Representative of the news media...
29 CFR 1401.36 - Freedom of Information Act fee schedules.
Code of Federal Regulations, 2012 CFR
2012-07-01
... scientific research, the results of which are not intended to promote any particular product or industry. (b... furtherance of scholarly or scientific research. (iii) Requesters who are representatives of the news media... education, which operates a program or programs of scholarly research. (7) Representative of the news media...
12 CFR Appendix A to Subpart B of... - Risk-Based Capital Stress Test
Code of Federal Regulations, 2010 CFR
2010-01-01
... Loan Number Ending Scheduled Balance Group Pre/Post Act Property State Product Type Origination Date... program assets post-1996 Act Swap balances; (iii) Farmer Mac I program assets pre-1996 Act; (iv) Farmer... stress test applies quarterly updates of the weighted average guarantee rates for post-1996 Farmer Mac I...
12 CFR Appendix A to Subpart B of... - Risk-Based Capital Stress Test
Code of Federal Regulations, 2011 CFR
2011-01-01
... Loan Number Ending Scheduled Balance Group Pre/Post Act Property State Product Type Origination Date... program assets post-1996 Act Swap balances; (iii) Farmer Mac I program assets pre-1996 Act; (iv) Farmer... stress test applies quarterly updates of the weighted average guarantee rates for post-1996 Farmer Mac I...
7 CFR 2.24 - Assistant Secretary for Administration.
Code of Federal Regulations, 2011 CFR
2011-01-01
... continue, modify, or terminate an information technology program or project. (iii) Provide advice and other... exchange, scheduling, computer conferencing, televideo technologies, and other applications of office... Chief Information Officers and agency major information technology system project managers in accordance...
7 CFR 2.24 - Assistant Secretary for Administration.
Code of Federal Regulations, 2012 CFR
2012-01-01
... continue, modify, or terminate an information technology program or project. (iii) Provide advice and other... exchange, scheduling, computer conferencing, televideo technologies, and other applications of office... Chief Information Officers and agency major information technology system project managers in accordance...
7 CFR 2.24 - Assistant Secretary for Administration.
Code of Federal Regulations, 2013 CFR
2013-01-01
... determining whether to continue, modify, or terminate an information technology program or project. (iii... technology to improve productivity in the Department. (P) Plan, develop, install, and operate computer-based systems for message exchange, scheduling, computer conferencing, televideo technologies, and other...
10 CFR 74.45 - Measurements and measurement control.
Code of Federal Regulations, 2013 CFR
2013-01-01
... measurements, obtaining samples, and performing laboratory analyses for element concentration and isotope... of random error behavior. On a predetermined schedule, the program shall include, as appropriate: (i) Replicate analyses of individual samples; (ii) Analysis of replicate process samples; (iii) Replicate volume...
10 CFR 74.45 - Measurements and measurement control.
Code of Federal Regulations, 2014 CFR
2014-01-01
... measurements, obtaining samples, and performing laboratory analyses for element concentration and isotope... of random error behavior. On a predetermined schedule, the program shall include, as appropriate: (i) Replicate analyses of individual samples; (ii) Analysis of replicate process samples; (iii) Replicate volume...
10 CFR 74.45 - Measurements and measurement control.
Code of Federal Regulations, 2012 CFR
2012-01-01
... measurements, obtaining samples, and performing laboratory analyses for element concentration and isotope... of random error behavior. On a predetermined schedule, the program shall include, as appropriate: (i) Replicate analyses of individual samples; (ii) Analysis of replicate process samples; (iii) Replicate volume...
History of Concurrency. The Controversy of Military Acquisition Program Schedule Compression
1986-09-01
33 The Manhattan Project . ........... 35 Post-War Acquisition . . . . ...... 40 The Lockheed Skunk Works ........ 42 iii Era of Controversy...been involved Vin the Manhattan Project (47:55). The concurrency concept and the innovative foundation of the Air Force Ballistic Missile Program...inter- F4 continental oallistic missile. To snorten the program’s development time they drew upon lessons from the Manhattan Project and made three
Joint Services Electronics Program.
1980-05-01
STATEMMEN A Approved for public release, COD Distribution Unlimited.99 Joint Services Electronics Program* _-ANNUAL PROGRESS RP O. 93) 7 / Covering Period...and the temperature dependence of that (dispersive transport) trap limited mobility has shown interesting new effects. Publications of the Research...Low-Cost Laboratory Computer Interface System," (Scheduled for publication May, 1980, Review ot Scinti’i3 Instruments). | i III. INFORMATION
DOT National Transportation Integrated Search
2003-11-14
Transit Tracker uses global positioning system (GPS) technology to track how far a bus is along its scheduled route. This document presents the evaluation strategies and objectives, the data collection methodologies, and the results of the evaluation...
28 CFR 2.219 - Maximum terms of imprisonment and supervised release.
Code of Federal Regulations, 2011 CFR
2011-07-01
... other than above (e.g., marijuana/hashish), or schedule III drugs 3 years 2 years. If schedule IV drugs... PCP 5 years 3 years. If schedule I or II drugs other than above (e.g., marijuana, hashish....g., marijuana, hashish), or schedule III or IV drugs 3 years 2 years. If schedule V drugs 3 years 1...
28 CFR 2.219 - Maximum terms of imprisonment and supervised release.
Code of Federal Regulations, 2013 CFR
2013-07-01
... other than above (e.g., marijuana/hashish), or schedule III drugs 3 years 2 years. If schedule IV drugs... PCP 5 years 3 years. If schedule I or II drugs other than above (e.g., marijuana, hashish....g., marijuana, hashish), or schedule III or IV drugs 3 years 2 years. If schedule V drugs 3 years 1...
28 CFR 2.219 - Maximum terms of imprisonment and supervised release.
Code of Federal Regulations, 2012 CFR
2012-07-01
... other than above (e.g., marijuana/hashish), or schedule III drugs 3 years 2 years. If schedule IV drugs... PCP 5 years 3 years. If schedule I or II drugs other than above (e.g., marijuana, hashish....g., marijuana, hashish), or schedule III or IV drugs 3 years 2 years. If schedule V drugs 3 years 1...
28 CFR 2.219 - Maximum terms of imprisonment and supervised release.
Code of Federal Regulations, 2014 CFR
2014-07-01
... other than above (e.g., marijuana/hashish), or schedule III drugs 3 years 2 years. If schedule IV drugs... PCP 5 years 3 years. If schedule I or II drugs other than above (e.g., marijuana, hashish....g., marijuana, hashish), or schedule III or IV drugs 3 years 2 years. If schedule V drugs 3 years 1...
28 CFR 2.219 - Maximum terms of imprisonment and supervised release.
Code of Federal Regulations, 2010 CFR
2010-07-01
... other than above (e.g., marijuana/hashish), or schedule III drugs 3 years 2 years. If schedule IV drugs... PCP 5 years 3 years. If schedule I or II drugs other than above (e.g., marijuana, hashish....g., marijuana, hashish), or schedule III or IV drugs 3 years 2 years. If schedule V drugs 3 years 1...
28 CFR 2.204 - Conditions of supervised release.
Code of Federal Regulations, 2011 CFR
2011-07-01
... schedule. (iii) If the term of supervision results from a conviction for a domestic violence crime, and... the program of a community corrections center, or both, for all or part of the period of supervision... Columbia; (2) Supervision officer means a Community Supervision Officer of the District of Columbia Court...
46 CFR 199.190 - Operational readiness, maintenance, and inspection of lifesaving equipment.
Code of Federal Regulations, 2012 CFR
2012-10-01
... each fuel tank must be emptied, cleaned, and refilled with fresh fuel. (2) Each davit, winch, fall, and... required under paragraph (e) of this section. (ii) Maintenance and repair instructions. (iii) A schedule of... planned maintenance program that includes the items listed in that paragraph. (c) Spare parts and repair...
46 CFR 199.190 - Operational readiness, maintenance, and inspection of lifesaving equipment.
Code of Federal Regulations, 2013 CFR
2013-10-01
... each fuel tank must be emptied, cleaned, and refilled with fresh fuel. (2) Each davit, winch, fall, and... required under paragraph (e) of this section. (ii) Maintenance and repair instructions. (iii) A schedule of... planned maintenance program that includes the items listed in that paragraph. (c) Spare parts and repair...
46 CFR 199.190 - Operational readiness, maintenance, and inspection of lifesaving equipment.
Code of Federal Regulations, 2014 CFR
2014-10-01
... each fuel tank must be emptied, cleaned, and refilled with fresh fuel. (2) Each davit, winch, fall, and... required under paragraph (e) of this section. (ii) Maintenance and repair instructions. (iii) A schedule of... planned maintenance program that includes the items listed in that paragraph. (c) Spare parts and repair...
46 CFR 199.190 - Operational readiness, maintenance, and inspection of lifesaving equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... each fuel tank must be emptied, cleaned, and refilled with fresh fuel. (2) Each davit, winch, fall, and... required under paragraph (e) of this section. (ii) Maintenance and repair instructions. (iii) A schedule of... planned maintenance program that includes the items listed in that paragraph. (c) Spare parts and repair...
34 CFR 668.47 - Report on athletic program participation rates and financial support data.
Code of Federal Regulations, 2013 CFR
2013-07-01
...— (A) Lodging, meals, transportation, uniforms, and equipment for coaches, team members, support staff (including, but not limited to team managers and trainers), and others; and (B) Officials. (iii) Recruiting.... (3)(i) Participants means students who, as of the day of a varsity team's first scheduled contest— (A...
34 CFR 668.47 - Report on athletic program participation rates and financial support data.
Code of Federal Regulations, 2011 CFR
2011-07-01
...— (A) Lodging, meals, transportation, uniforms, and equipment for coaches, team members, support staff (including, but not limited to team managers and trainers), and others; and (B) Officials. (iii) Recruiting.... (3)(i) Participants means students who, as of the day of a varsity team's first scheduled contest— (A...
34 CFR 668.47 - Report on athletic program participation rates and financial support data.
Code of Federal Regulations, 2012 CFR
2012-07-01
...— (A) Lodging, meals, transportation, uniforms, and equipment for coaches, team members, support staff (including, but not limited to team managers and trainers), and others; and (B) Officials. (iii) Recruiting.... (3)(i) Participants means students who, as of the day of a varsity team's first scheduled contest— (A...
34 CFR 668.47 - Report on athletic program participation rates and financial support data.
Code of Federal Regulations, 2010 CFR
2010-07-01
...— (A) Lodging, meals, transportation, uniforms, and equipment for coaches, team members, support staff (including, but not limited to team managers and trainers), and others; and (B) Officials. (iii) Recruiting.... (3)(i) Participants means students who, as of the day of a varsity team's first scheduled contest— (A...
Hoffmeister, F
1980-01-01
Rhesus monkeys were trained to complete three multiple schedules. The schedules consisted of three components: a fixed interval (component 1), a variable interval (component 2), and a fixed ratio (component 3). During components 1 and 2, pressing lever 1 was always reinforced by food delivery. During component 3, pressing lever 2 resulted in either food delivery or intravenous infusions of saline solution, solutions of cocaine, of d-amphetamine, of phenmetrazine, or fenetylline. In schedule I, animals were presented with all three components independent of key-pressing behavior during components 1 and 2. In schedule II the availability of component 2 was dependent on completion of component 1. Component 3 was made available only on completion of component 2. Noncompletion of components 1 or 2 resulted in time-out of 15 and 10 min, respectively. Schedule III was identical with schedule II, except that in schedule III the completion of components was indicated only by a change in the lever lights. The influence of self-administered drugs on behavior in all three components was evaluated. Self-administration of psychomotor stimulants impaired the performance of animals and delayed completion of components 1 and 2 of schedules I, II, and III. The effects on behavior were similar with low drug intake in schedule III, moderate intake in schedule II, and high drug intake in schedule I. These effects were strong with self-administration of phenmetrazine, moderate with self-administration of cocaine and d-amphetamine, and weak with self-administration of fenetylline.
ERIC Educational Resources Information Center
Wong, Jeffrey G.; Holmboe, Eric S.; Becker, William C.; Fiellin, David A.; Jara, Gail B.; Martin, Judith
2005-01-01
The Drug Addiction Treatment Act of 2000 (DATA-2000) allows qualified physicians to treat opioid-dependent patients with schedule III-V medications, such as buprenorphine, in practices separate from licensed, accredited opioid treatment programs. Physicians may attain this qualification by completing 8-hours of training in treating opioid…
Kang, Sung Gu; Ryu, Byung Ju; Yang, Kyung Sook; Ko, Young Hwii; Cho, Seok; Kang, Seok Ho; Patel, Vipul R; Cheon, Jun
2015-01-01
A robotic virtual reality simulator (Mimic dV-Trainer) can be a useful training method for the da Vinci surgical system. Herein, we investigate several repetitive training schedules and determine which is the most effective. A total of 30 medical students were enrolled and were divided into 3 groups according to the training schedule. Group 1 performed the task 1 hour daily for 4 consecutive days, group II performed the task on once per week for 1 hour for 4 consecutive weeks, and group III performed the task for 4 consecutive hours in 1 day. The effects of training were investigated by analyzing the number of repetitions and the time required to complete the "Tube 2" simulation task when the learning curve plateau was reached. The point at which participants reached a stable score was evaluated using the cumulative sum control graph. The average time to complete the task at the learning curve plateau was 150.3 seconds in group I, 171.9 seconds in group II, and 188.5 seconds in group III. The number of task repetitions required to reach the learning curve plateau was 45 repetitions in group I, 36 repetitions in group II, and 39 repetitions in group III. Therefore, there was continuous improvement in the time required to perform the task after 40 repetitions in group I only. There was a significant correlation between improvement in each trial interval and attempt, and the correlation coefficient (0.924) in group I was higher than that in group II (0.899) and group III (0.838). Daily 1-hour practice sessions performed for 4 consecutive days resulted in the best final score, continuous score improvement, and effective training while minimizing fatigue. This repetition schedule can be used for effectively training novices in future. Copyright © 2015 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.
49 CFR Appendix A to Part 214 - Schedule of Civil Penalties 1
Code of Federal Regulations, 2010 CFR
2010-10-01
...,000 Subpart C—Roadway Worker Protection Rule 214.303 Railroad on-track safety programs, generally: (a... briefing 2,000 5,000 (c)(i) Failure to designate roadway worker in charge of roadway work group 2,000 5,000 (ii) Designation of more than one roadway worker in charge of one roadway work group 1,000 2,000 (iii...
External Tank Program Legacy of Success
NASA Technical Reports Server (NTRS)
Welzyn, Ken; Pilet, Jeff
2010-01-01
I.Goal: a) Extensive TPS damage caused by extreme hail storm. b) Repair plan required to restore TPS to minimize program manifest impacts. II. Challenges: a) Skeptical technical community - Concerned about interactions of damage with known/unknown failure modes. b) Schedule pressure to accommodate ISS program- Next tank still at MAF c)Limited ET resources. III. How d We Do It?: a) Developed unique engineering requirements and tooling to minimize repairs. b) Performed large amount of performance testing to demonstrate understanding of repairs and residual conditions. c) Effectively communicated results to technical community and management to instill confidence in expected performance.
Kleinman, Steven; Busch, Michael P; Murphy, Edward L; Shan, Hua; Ness, Paul; Glynn, Simone A.
2014-01-01
Background The Recipient Epidemiology and Donor Evaluation Study -III (REDS-III) is a 7-year multicenter transfusion safety research initiative launched in 2011 by the National Heart, Lung, and Blood Institute. Study design The domestic component involves 4 blood centers, 12 hospitals, a data coordinating center, and a central laboratory. The international component consists of distinct programs in Brazil, China, and South Africa which involve US and in-country investigators. Results REDS-III is using two major methods to address key research priorities in blood banking/transfusion medicine. First, there will be numerous analyses of large “core” databases; the international programs have each constructed a donor/donation database while the domestic program has established a detailed research database that links data from blood donors and their donations, the components made from these donations, and data extracts from the electronic medical records of the recipients of these components. Secondly, there are more than 25 focused research protocols involving transfusion recipients, blood donors, or both that are either in progress or scheduled to begin within the next 3 years. Areas of study include transfusion epidemiology and blood utilization; transfusion outcomes; non-infectious transfusion risks; HIV-related safety issues (particularly in the international programs); emerging infectious agents; blood component quality; donor health and safety; and other donor issues. Conclusions It is intended that REDS-III serve as an impetus for more widespread recipient and linked donor-recipient research in the US as well as to help assure a safe and available blood supply in the US and in international locations. PMID:24188564
A Form 990 Schedule H conundrum: how much of your bad debt might be charity?
Bailey, Shari; Franklin, David; Hearle, Keith
2010-04-01
IRS Form 990 Schedule H requires hospitals to estimate the amount of bad debt expense attributable to patients eligible for charity under the hospital's charity care policy. Responses to Schedule H, Part III.A.3 open up the entire patient collection process to examination by the IRS, state officials, and the public. Using predictive analytics can help hospitals efficiently identify charity-eligible patients when answering Part III.A.3.
NASA Technical Reports Server (NTRS)
Bonine, Lauren
2015-01-01
The presentation provides insight into the schedule risk analysis process used by the Stratospheric Aerosol and Gas Experiment III on the International Space Station Project. The presentation focuses on the schedule risk analysis process highlighting the methods for identification of risk inputs, the inclusion of generic risks identified outside the traditional continuous risk management process, and the development of tailored analysis products used to improve risk informed decision making.
77 FR 60743 - Proposed Collection; Comment Request for Schedule F, Part II and III (Form 1040)
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-04
... Farming. DATES: Written comments should be received on or before December 3, 2012 to be assured of... Loss From Farming. OMB Number: 1545-1976. Form Number: Schedule F, Part II and III (Form 1040... collection. Affected Public: Businesses and other for-profit organizations, Farming. Estimated Number of...
A Program Office Guide to Technology Transfer
1988-11-01
Requirements 2-4 2.4.1 Equipment Complexity 2-5 2.4.2 Industrial Capabilities 2-5 2.4.3 Logistics Requirements/Configuration Control 2-5 2.4.4 Schedule...accomplishment of these milestones re- with the leverage of the FSD and production pro- sults in second source full production capability , grams. For more...MANUFACTURING PROCESSES BUILD UP COMPETITIVE PRODUCTION RATE CAPABILITY DURING LOT III Table 1.2-1 AMRAAM Technology Transfer The leader-follower approach is
Trends in Opioid Prescriptions among Part D Medicare Recipients from 2007 to 2012
Kuo, Yong-Fang; Raji, Mukaila A.; Chen, Nai-Wei; Hasan, Hunaid; Goodwin, James S.
2015-01-01
Background There is growing concern about potential overuse of, and toxicity from, opioid analgesics. No nationally representative study has examined inter-state variations in opioid use and impact of policy on opioid use among older adults. Methods We used national Medicare data from 2007-2012 to assess temporal and geographic trends in rates of opioid prescription and relationship to opioid toxicity and different state regulations in Part D Medicare recipients. We excluded those with a cancer diagnosis. Multilevel, multivariable regression analyses evaluated rates of prolonged prescriptions for schedule II, schedule III, and combination II/III opioid for each state, adjusting for patient characteristics. Results The percent of Part D recipients receiving prescriptions for combined schedule II/III opioid more than 90 days in a year increased from 4.62% in 2007 to 7.35% in 2012. Large variations existed among states in rates of opioid prescriptions: from 2.84% in New York to 10.93% in Utah, in 2012 data. The state variation was larger for schedule III than schedule II. Individual characteristics independently associated with prolonged use included older age, female gender, white race, low-income, living in a lower education area, and comorbidity of drug abuse, rheumatoid arthritis, depression. Only state law regulating pain clinic was associated with reduction of schedule II opioid prescriptions. Prolonged opioid prescription use increased the odds of opioid overdose-related emergency room visits or hospitalization by 60%. Conclusions Analyses of Medicare Part D data demonstrated a substantial growth in opioid prescriptions from 2007 to 2011 and large variation in opioid prescriptions across states. PMID:26522794
Data Base Development of Automobile and Light Truck Maintenance : Volume III. Appendix F.
DOT National Transportation Integrated Search
1978-08-01
The document contains the scheduled maintenance data sheets and total cost summaries--both scheduled and unscheduled maintenance (Life cycle cost for Dealers, life cycle cost for Service Stations, life cycle cost for Independent Repair, and scheduled...
Controversies in rabies vaccination.
Ghosh, Tapan Kr
2003-06-01
Rabies is a cent per cent fatal disease and there should not be any controversy in giving rabies vaccine to the victims. WHO has fixed schedules for doses for both pre and post-exposure in different category of cases, which also help us to avoid all controversies. But controversies arise in five main areas, which are related to the strategies of rabies prevention. These are: (i) Replacing use of NTV by MTCV. (ii) Intradermal schedule of MTCV, in place of Essen protocol of 5 i.m. doses to reduce the cost. (iii) Acceptability and inclusion of pre-exposure doses of MTCV in the immunization schedule of children as additional vaccine (iv) Schedule for re-exposure in already post-exposure vaccinated cases and schedule for exposure in pre-exposure vaccinated cases. (v) Uses of RIG in WHO category III cases. If these controversial issues are considered scientifically, rabies prophylaxis will see the light of success.
Code of Federal Regulations, 2013 CFR
2013-01-01
... a Schedule 3 chemical above the declaration threshold; (ii) You plan to produce at a plant declared...; (iii) You plan to increase the production of a Schedule 3 chemical by declared plants on your plant... production of a Schedule 3 chemical at a declared plant site to an amount above the upper limit of the range...
Code of Federal Regulations, 2012 CFR
2012-01-01
... a Schedule 3 chemical above the declaration threshold; (ii) You plan to produce at a plant declared...; (iii) You plan to increase the production of a Schedule 3 chemical by declared plants on your plant... production of a Schedule 3 chemical at a declared plant site to an amount above the upper limit of the range...
Code of Federal Regulations, 2014 CFR
2014-01-01
... a Schedule 3 chemical above the declaration threshold; (ii) You plan to produce at a plant declared...; (iii) You plan to increase the production of a Schedule 3 chemical by declared plants on your plant... production of a Schedule 3 chemical at a declared plant site to an amount above the upper limit of the range...
Code of Federal Regulations, 2011 CFR
2011-07-01
...; and (iii) Handling, transportation, and storage; (2) Blast designs, including— (i) Geologic and topographic considerations; (ii) Design of a blast hole, with critical dimensions; (iii) Pattern design, field... records; (9) Schedules; (10) Preblasting surveys, including— (i) Availability, (ii) Coverage, and (iii...
Code of Federal Regulations, 2010 CFR
2010-07-01
...; and (iii) Handling, transportation, and storage; (2) Blast designs, including— (i) Geologic and topographic considerations; (ii) Design of a blast hole, with critical dimensions; (iii) Pattern design, field... records; (9) Schedules; (10) Preblasting surveys, including— (i) Availability, (ii) Coverage, and (iii...
Code of Federal Regulations, 2012 CFR
2012-07-01
...; and (iii) Handling, transportation, and storage; (2) Blast designs, including— (i) Geologic and topographic considerations; (ii) Design of a blast hole, with critical dimensions; (iii) Pattern design, field... records; (9) Schedules; (10) Preblasting surveys, including— (i) Availability, (ii) Coverage, and (iii...
Code of Federal Regulations, 2014 CFR
2014-07-01
...; and (iii) Handling, transportation, and storage; (2) Blast designs, including— (i) Geologic and topographic considerations; (ii) Design of a blast hole, with critical dimensions; (iii) Pattern design, field... records; (9) Schedules; (10) Preblasting surveys, including— (i) Availability, (ii) Coverage, and (iii...
Code of Federal Regulations, 2013 CFR
2013-07-01
...; and (iii) Handling, transportation, and storage; (2) Blast designs, including— (i) Geologic and topographic considerations; (ii) Design of a blast hole, with critical dimensions; (iii) Pattern design, field... records; (9) Schedules; (10) Preblasting surveys, including— (i) Availability, (ii) Coverage, and (iii...
41 CFR 105-54.303 - Fiscal and administrative provisions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... support, arranges with the Office of Finance, Office of the Comptroller, for maintaining all financial... Schedule classification and pay system in Chapter 51 and Subchapter III of Chapter 53 of Title 5, U.S.C. (e... under the General Schedule, General Management Schedule, or Senior Executive Service classification...
15 CFR 716.2 - Purposes and types of inspections of declared facilities.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS... chemical, except for the declared Schedule 1 chemicals; (ii) The quantities of Schedule 1 chemicals...; and (iii) The Schedule 1 chemical is not diverted or used for purposes other than those declared. (2...
15 CFR 716.2 - Purposes and types of inspections of declared facilities.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS... chemical, except for the declared Schedule 1 chemicals; (ii) The quantities of Schedule 1 chemicals...; and (iii) The Schedule 1 chemical is not diverted or used for purposes other than those declared. (2...
77 FR 38086 - Manufacturer of Controlled Substances; Notice of Application; Chemica
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-26
... bulk manufacturer of Methamphetamine (1105), a basic class of controlled substance listed in schedule... schedule III non-narcotic controlled substance. The methamphetamine will not be sold as a commercial...
Penny, Melissa A; Galactionova, Katya; Tarantino, Michael; Tanner, Marcel; Smith, Thomas A
2015-07-29
The RTS,S/AS01 malaria vaccine candidate recently completed Phase III trials in 11 African sites. Recommendations for its deployment will partly depend on predictions of public health impact in endemic countries. Previous predictions of these used only limited information on underlying vaccine properties and have not considered country-specific contextual data. Each Phase III trial cohort was simulated explicitly using an ensemble of individual-based stochastic models, and many hypothetical vaccine profiles. The true profile was estimated by Bayesian fitting of these models to the site- and time-specific incidence of clinical malaria in both trial arms over 18 months of follow-up. Health impacts of implementation via two vaccine schedules in 43 endemic sub-Saharan African countries, using country-specific prevalence, access to care, immunisation coverage and demography data, were predicted via weighted averaging over many simulations. The efficacy against infection of three doses of vaccine was initially approximately 65 % (when immunising 6-12 week old infants) and 80 % (children 5-17 months old), with a 1 year half-life (exponential decay). Either schedule will avert substantial disease, but predicted impact strongly depends on the decay rate of vaccine effects and average transmission intensity. For the first time Phase III site- and time-specific data were available to estimate both the underlying profile of RTS,S/AS01 and likely country-specific health impacts. Initial efficacy will probably be high, but decay rapidly. Adding RTS,S to existing control programs, assuming continuation of current levels of malaria exposure and of health system performance, will potentially avert 100-580 malaria deaths and 45,000 to 80,000 clinical episodes per 100,000 fully vaccinated children over an initial 10-year phase.
Scheduling: A guide for program managers
NASA Technical Reports Server (NTRS)
1994-01-01
The following topics are discussed concerning scheduling: (1) milestone scheduling; (2) network scheduling; (3) program evaluation and review technique; (4) critical path method; (5) developing a network; (6) converting an ugly duckling to a swan; (7) network scheduling problem; (8) (9) network scheduling when resources are limited; (10) multi-program considerations; (11) influence on program performance; (12) line-of-balance technique; (13) time management; (14) recapitulization; and (15) analysis.
12 CFR 327.10 - Assessment rate schedules.
Code of Federal Regulations, 2011 CFR
2011-01-01
...) The risk factors and other factors taken into account pursuant to 12 U.S.C. 1817(b)(1); and (v) Any... prescribed in the following schedule: Initial Base Assessment Rate Schedule Risk category I * Minimum Maximum II III IV Annual rates (in basis points) 12 16 22 32 45 * All amounts for all risk categories are in...
12 CFR 327.10 - Assessment rate schedules.
Code of Federal Regulations, 2010 CFR
2010-01-01
...) The risk factors and other factors taken into account pursuant to 12 U.S.C. 1817(b)(1); and (v) Any... prescribed in the following schedule: Initial Base Assessment Rate Schedule Risk category I * Minimum Maximum II III IV Annual rates (in basis points) 12 16 22 32 45 * All amounts for all risk categories are in...
Nonuniform sampling by quantiles.
Craft, D Levi; Sonstrom, Reilly E; Rovnyak, Virginia G; Rovnyak, David
2018-03-01
A flexible strategy for choosing samples nonuniformly from a Nyquist grid using the concept of statistical quantiles is presented for broad classes of NMR experimentation. Quantile-directed scheduling is intuitive and flexible for any weighting function, promotes reproducibility and seed independence, and is generalizable to multiple dimensions. In brief, weighting functions are divided into regions of equal probability, which define the samples to be acquired. Quantile scheduling therefore achieves close adherence to a probability distribution function, thereby minimizing gaps for any given degree of subsampling of the Nyquist grid. A characteristic of quantile scheduling is that one-dimensional, weighted NUS schedules are deterministic, however higher dimensional schedules are similar within a user-specified jittering parameter. To develop unweighted sampling, we investigated the minimum jitter needed to disrupt subharmonic tracts, and show that this criterion can be met in many cases by jittering within 25-50% of the subharmonic gap. For nD-NUS, three supplemental components to choosing samples by quantiles are proposed in this work: (i) forcing the corner samples to ensure sampling to specified maximum values in indirect evolution times, (ii) providing an option to triangular backfill sampling schedules to promote dense/uniform tracts at the beginning of signal evolution periods, and (iii) providing an option to force the edges of nD-NUS schedules to be identical to the 1D quantiles. Quantile-directed scheduling meets the diverse needs of current NUS experimentation, but can also be used for future NUS implementations such as off-grid NUS and more. A computer program implementing these principles (a.k.a. QSched) in 1D- and 2D-NUS is available under the general public license. Copyright © 2018 Elsevier Inc. All rights reserved.
Nonuniform sampling by quantiles
NASA Astrophysics Data System (ADS)
Craft, D. Levi; Sonstrom, Reilly E.; Rovnyak, Virginia G.; Rovnyak, David
2018-03-01
A flexible strategy for choosing samples nonuniformly from a Nyquist grid using the concept of statistical quantiles is presented for broad classes of NMR experimentation. Quantile-directed scheduling is intuitive and flexible for any weighting function, promotes reproducibility and seed independence, and is generalizable to multiple dimensions. In brief, weighting functions are divided into regions of equal probability, which define the samples to be acquired. Quantile scheduling therefore achieves close adherence to a probability distribution function, thereby minimizing gaps for any given degree of subsampling of the Nyquist grid. A characteristic of quantile scheduling is that one-dimensional, weighted NUS schedules are deterministic, however higher dimensional schedules are similar within a user-specified jittering parameter. To develop unweighted sampling, we investigated the minimum jitter needed to disrupt subharmonic tracts, and show that this criterion can be met in many cases by jittering within 25-50% of the subharmonic gap. For nD-NUS, three supplemental components to choosing samples by quantiles are proposed in this work: (i) forcing the corner samples to ensure sampling to specified maximum values in indirect evolution times, (ii) providing an option to triangular backfill sampling schedules to promote dense/uniform tracts at the beginning of signal evolution periods, and (iii) providing an option to force the edges of nD-NUS schedules to be identical to the 1D quantiles. Quantile-directed scheduling meets the diverse needs of current NUS experimentation, but can also be used for future NUS implementations such as off-grid NUS and more. A computer program implementing these principles (a.k.a. QSched) in 1D- and 2D-NUS is available under the general public license.
Managing Radiation Degradation of CCDs on the Chandra X-Ray Observatory--III
NASA Technical Reports Server (NTRS)
O'Dell, Stephen L.; Aldcroft, Thomas L.; Blackwell, William C.; Bucher, Sabina L.; Chappell, Jon H.; DePasquale, Joseph M.; Grant, Catherine E.; Juda, Michael; Martin, Eric R.; Minow, Joseph I.;
2007-01-01
The CCDs on the Chandra X-ray Observatory are vulnerable to radiation damage from low-energy protons scattered off the telescope's mirrors onto the focal plane. Following unexpected damage incurred early in the mission, the Chandra team developed, implemented, and maintains a radiation-protection program. This program--involving scheduled radiation safing during radiation-belt passes, intervention based upon real-time space-weather conditions and radiation-environment modeling, and on-board radiation monitoring with autonomous radiation safing--has successfully managed the radiation damage to the CCDs. Since implementing the program, the charge-transfer inefficiency (CTI) has increased at an average annual rate of only 3.2x 10(exp -6) (2.3 percent) for the front-illuminated CCDs and 1.0x10(exp -6) (6.7 percent) for the back-illuminated CCDs. This paper describes the current status of the Chandra radiation-management program, emphasizing enhancements implemented since the previous papers.
On program restructuring, scheduling, and communication for parallel processor systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Polychronopoulos, Constantine D.
1986-08-01
This dissertation discusses several software and hardware aspects of program execution on large-scale, high-performance parallel processor systems. The issues covered are program restructuring, partitioning, scheduling and interprocessor communication, synchronization, and hardware design issues of specialized units. All this work was performed focusing on a single goal: to maximize program speedup, or equivalently, to minimize parallel execution time. Parafrase, a Fortran restructuring compiler was used to transform programs in a parallel form and conduct experiments. Two new program restructuring techniques are presented, loop coalescing and subscript blocking. Compile-time and run-time scheduling schemes are covered extensively. Depending on the program construct, thesemore » algorithms generate optimal or near-optimal schedules. For the case of arbitrarily nested hybrid loops, two optimal scheduling algorithms for dynamic and static scheduling are presented. Simulation results are given for a new dynamic scheduling algorithm. The performance of this algorithm is compared to that of self-scheduling. Techniques for program partitioning and minimization of interprocessor communication for idealized program models and for real Fortran programs are also discussed. The close relationship between scheduling, interprocessor communication, and synchronization becomes apparent at several points in this work. Finally, the impact of various types of overhead on program speedup and experimental results are presented.« less
Space station program phase B definition: Nuclear reactor-powered space station cost and schedules
NASA Technical Reports Server (NTRS)
1971-01-01
Tabulated data are presented on the costs, schedules, and technical characteristics for the space station phases C and D program. The work breakdown structure, schedule data, program ground rules, program costs, cost-estimating rationale, funding schedules, and supporting data are included.
DSM-IV: a nosology sold before its time?
Zimmerman, M; Jampala, V C; Sierles, F S; Taylor, M A
1991-04-01
The purpose of this study was to determine whether American psychiatrists believe that DSM-IV is being published too soon after DSM-III-R. The authors conducted a mail survey of the attitudes of practicing psychiatrists (N = 454), residency program directors (N = 128), residents (N = 1,331), and researchers (N = 196) toward the scheduled publication of DSM-IV in the early 1990s. They found that the majority of all four groups believed that DSM-IV is being published prematurely. In contrast to respondents who believed that the timing of DSM-IV is appropriate, those who indicated that it is being published too soon had more recently completed their residency training and also believed that DSM-III-R was published prematurely. There was no association between the psychiatrists' responses and their theoretical orientation, Board certification status, ownership of the DSM manuals, the length of time they had used DSM-III, and the diagnostic manual (DSM-III or DSM-III-R) they were currently using. The belief that DSM-IV is being published too soon could contribute to underuse of DSM-IV by substantial numbers of psychiatrists. Thus, to foster compliance with it, APA must preserve in its efforts to demonstrate that the advantages of publishing it in 1993 outweigh the disadvantages of adopting yet another manual.
Gantwerker, Eric A; Bannos, Cassandra; Cunningham, Michael J; Rahbar, Reza
2017-01-01
To describe a surgical categorization system to create a universal nomenclature, delineating patient complexity as a first step toward developing a true risk stratification system. Retrospective database review of all otolaryngology surgical procedures performed in a tertiary pediatric hospital system over one academic year (July 2012-June 2013). All otolaryngology surgical procedures were reviewed, encompassing 8478 procedures on 5711 patients. The attending otolaryngologist assigned surgical scheduling category (SSCS) at the time of case booking based on an institution specific guidelines. The guidelines are as follow: Category I was assigned to American Society of Anesthesiologists physical status classification (ASA) I/II patients, designating them appropriate for institution's suburban ambulatory surgery centers; Category II was ASA I/II patients with social or transportation issues; Category III was ASA I/II patients who required case coordination with other medical or surgical departments; Category IV was reserved for patients of any ASA class whom the surgeon designated to be of a higher complexity. 8478 total procedures analyzed with 7198 having complete records. 48% were Category I, 13.6% were Category II, 1.9% were Category III and 36.5% were Category IV. The ASA were 34.7% ASA I, 50% ASA II, 13.39% ASA III, and 1.9% ASA IV. Although the largest proportion of patients were ASA II (50%), 39.6% of all ASA II were Category IV. Category IV was split into 54.2% ASA II and 34% ASA III and shows that peri-operative surgical concerns were not encompassed by the ASA system. This surgical categorization system streamlines surgical scheduling in a tertiary pediatric hospital system, particularly with respect to the designation of cases as ambulatory surgery center or main operating room appropriate. The case mix complexity is also readily apparent, enhancing recognition of the coordination and attention required for the perioperative management of high complexity patients. The SSCS helps convey concerns not addressed by ASA physical status alone. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.
1978-07-01
CLASSIFICATION AUTHORITY 3 DISTRIBUTION /AVAILABILITY OF REPORT 2b DECLASSIFICATION /DOWNGRADING SCHEDULE ApproveI. foe ubl ic release; distributionunn mi e 4...TAYPOL ARM , STOP EQUAL .- maT9 PALLO-EkLTOMERA ’EDDY~ "IA WElp TO J NEMA CLOW NOCO 1000 1.0- ."L L- - AT. T D III SCCTSomm n2-2 24 P 21 -OOOW I-0 AIA a...material in the downstream channel and any other physical evidence, describe the foundation material. CI .4, r A ZAM ~ A .4,1 ic 3. Basis for
76 FR 47089 - Regulatory Review Schedule; Cancellation of Consultation Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-04
... DEPARTMENT OF THE INTERIOR National Indian Gaming Commission 25 CFR Chapter III Regulatory Review Schedule; Cancellation of Consultation Meetings AGENCY: National Indian Gaming Commission. ACTION: Notice. SUMMARY: On November 18, 2010, the National Indian Gaming Commission (NIGC) issued a Notice of Inquiry and...
Creative Classroom Assignment Through Database Management.
ERIC Educational Resources Information Center
Shah, Vivek; Bryant, Milton
1987-01-01
The Faculty Scheduling System (FSS), a database management system designed to give administrators the ability to schedule faculty in a fast and efficient manner is described. The FSS, developed using dBASE III, requires an IBM compatible microcomputer with a minimum of 256K memory. (MLW)
7 CFR 46.45 - Procedure in administering section 2(5) of the Act.
Code of Federal Regulations, 2011 CFR
2011-01-01
... corrected before resale; or (iii) To withhold or fail to disclose known material facts with respect to a... complaint; (iii) (A) The schedule for informal disposition is as follows: Violation Disposition 1st (1) 2d...
7 CFR 46.45 - Procedure in administering section 2(5) of the Act.
Code of Federal Regulations, 2013 CFR
2013-01-01
... corrected before resale; or (iii) To withhold or fail to disclose known material facts with respect to a... complaint; (iii) (A) The schedule for informal disposition is as follows: Violation Disposition 1st (1) 2d...
40 CFR 52.720 - Identification of plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Illinois Pollution Control Board Regulations, Chapter 2, Parts I, II and III were submitted May 4, 1972, by the Governor. (3) A document describing the role of the Chicago Department of Environmental Control...) Compliance schedules submitted on March 13, 1973, by the Pollution Control Board. (6) Compliance schedules...
40 CFR 52.720 - Identification of plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Illinois Pollution Control Board Regulations, Chapter 2, Parts I, II and III were submitted May 4, 1972, by the Governor. (3) A document describing the role of the Chicago Department of Environmental Control...) Compliance schedules submitted on March 13, 1973, by the Pollution Control Board. (6) Compliance schedules...
75 FR 67054 - Listing of Approved Drug Products Containing Dronabinol in Schedule III
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-01
... dronabinol extracted from Cannabis sativa (i.e. naturally-derived), is identical to synthetically-produced... psychoactive component of the cannabis plant (marijuana). THC, as a general category, is listed in schedule I... capsule form containing natural dronabinol (derived from the cannabis plant) or synthetic dronabinol...
78 FR 62500 - Schedules of Controlled Substances: Placement of Perampanel into Schedule III
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-22
... of the Controlled Substances Act (CSA). This proposed action is based on a recommendation from the... (manufacture, distribute, dispense, import, export, engage in research, conduct instructional activities, and..., scientific, research, and industrial needs of the United States. Controlled substances have the potential for...
14 CFR 189.3 - Kinds of messages accepted or relayed.
Code of Federal Regulations, 2013 CFR
2013-01-01
... operating schedules; (iii) Concerning the servicing of aircraft en route or scheduled to depart within 48... en route or about to depart, if the changes are caused by unavoidable deviations from normal... by aircraft en route or about to depart; (vi) Concerning parts or materials urgently needed to...
14 CFR 189.3 - Kinds of messages accepted or relayed.
Code of Federal Regulations, 2011 CFR
2011-01-01
... operating schedules; (iii) Concerning the servicing of aircraft en route or scheduled to depart within 48... en route or about to depart, if the changes are caused by unavoidable deviations from normal... by aircraft en route or about to depart; (vi) Concerning parts or materials urgently needed to...
14 CFR 189.3 - Kinds of messages accepted or relayed.
Code of Federal Regulations, 2014 CFR
2014-01-01
... operating schedules; (iii) Concerning the servicing of aircraft en route or scheduled to depart within 48... en route or about to depart, if the changes are caused by unavoidable deviations from normal... by aircraft en route or about to depart; (vi) Concerning parts or materials urgently needed to...
Payload crew training scheduler (PACTS) user's manual
NASA Technical Reports Server (NTRS)
Shipman, D. L.
1980-01-01
The operation of the payload specialist training scheduler (PACTS) is discussed in this user's manual which is used to schedule payload specialists for mission training on the Spacelab experiments. The PACTS program is a fully automated interactive, computerized scheduling program equipped with tutorial displays. The tutorial displays are sufficiently detailed for use by a program analyst having no computer experience. The PACTS program is designed to operate on the UNIVAC 1108 computer system, and has the capability to load output into a PDP 11/45 Interactive Graphics Display System for printing schedules. The program has the capacity to handle up to three overlapping Spacelab missions.
77 FR 39737 - Controlled Substances: Proposed Adjustment to the Aggregate Production Quotas for 2012
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-05
... aggregate production quotas for some schedule I and II controlled substances, expressed in grams of.... [750,000 grams of levo-desoxyephedrine for use in a non-controlled, non-prescription product; 2,331,000 grams for methamphetamine mostly for conversion to a schedule III product; and 49,000 grams for...
78 FR 72013 - Schedules of Controlled Substances: Placement of Perampanel into Schedule III
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-02
... was approved for marketing by the FDA as an adjunctive treatment of partial-onset seizures with or... Management and Budget (OMB) pursuant to section 3(d)(1) of Executive Order 12866 and the principles... small entity. Once generic equivalents are developed and approved for manufacturing and marketing, there...
Banks, Matthew L; Blough, Bruce E; Negus, S Stevens
2013-08-01
The clinical utility of monoamine releasers such as phenmetrazine or d-amphetamine as candidate agonist medications for cocaine dependence is hindered by their high abuse liability. Phendimetrazine is a clinically available schedule III anorectic that functions as a prodrug for phenmetrazine and thus may have lower abuse liability. This study determined the effects of continuous 14-day treatment with phendimetrazine on cocaine vs. food choice in rhesus monkeys (N=4). Responding was maintained under a concurrent schedule of food delivery (1-g pellets, fixed-ratio 100 schedule) and cocaine injections (0-0.1mg/kg/injection, fixed-ratio 10 schedule). Cocaine choice dose-effect curves were determined daily before and during 14-day periods of continuous intravenous treatment with saline or (+)-phendimetrazine (0.32-1.0mg/kg/h). Effects of 14-day treatment with (+)-phenmetrazine (0.1-0.32 mg/kg/h; N=5) and d-amphetamine (0.032-0.1mg/kg/h; N=6) were also examined for comparison. During saline treatment, food was primarily chosen during availability of low cocaine doses (0, 0.0032, and 0.01 mg/kg/injection), and cocaine was primarily chosen during availability of higher cocaine doses (0.032 and 0.1mg/kg/injection). Phendimetrazine initially decreased overall responding without significantly altering cocaine choice. Over the course of 14 days, tolerance developed to rate decreasing effects, and phendimetrazine dose-dependently decreased cocaine choice (significant at 0.032 mg/kg/injection cocaine). Phenmetrazine and d-amphetamine produced qualitatively similar effects. These results demonstrate that phendimetrazine can produce significant, though modest, reductions in cocaine choice in rhesus monkeys. Phendimetrazine may be especially suitable as a candidate medication for human studies because of its schedule III clinical availability. Copyright © 2013 Elsevier Ireland Ltd. All rights reserved.
76 FR 67162 - Combined Notice of Filings #2
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-31
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings 2 Take notice.... Description: Southwest Power Pool, Inc. submits tariff filing per 35.13(a)(2)(iii): 2158R1 Arkansas Electric...(a)(2)(iii): Rate Schedule No. 176 of Florida Power Corporation to be effective 12/21/2011. Filed...
76 FR 17407 - Combined Notice of Filings #2
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-29
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings 2 Take notice... Operator Corporation submits tariff filing per 35.13(a)(2)(iii: 2011-03-18 CAISO Tariff Filing to be... Description: Carolina Power & Light Company submits tariff filing per 35.13(a)(2)(iii: Rate Schedule No. 182...
Space shuttle maintenance program planning document
NASA Technical Reports Server (NTRS)
Brown, D. V.
1972-01-01
A means for developing a space shuttle maintenance program which will be acceptable to the development centers, the operators (KSC and AF), and the manufacturer is presented. The general organization and decision processes for determining the essential scheduled maintenance requirements for the space shuttle orbiter are outlined. The development of initial scheduled maintenance programs is discussed. The remaining maintenance, that is non-scheduled or non-routine maintenance, is directed by the findings of the scheduled maintenance program and the normal operation of the shuttle. The remaining maintenance consists of maintenance actions to correct discrepancies noted during scheduled maintenance tasks, nonscheduled maintenance, normal operation, or condition monitoring.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-07
... needs for the List I chemicals ephedrine, pseudoephedrine, and phenylpropanolamine, expressed in grams...,000 g Methamphetamine 3,912,500 g [987,500 grams of levo-desoxyephedrine for use in a non-controlled, non- prescription product; 2,863,750 grams for methamphetamine mostly for conversion to a schedule III...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-03
... phenylpropanolamine, expressed in grams of anhydrous acid or base, be established as follows: Proposed 2014 Basic... grams of levo-desoxyephedrine for use in a non-controlled, non-prescription product; 2,600,000 grams for methamphetamine mostly for conversion to a schedule III product; and 61,375 grams for methamphetamine (for sale...
49 CFR 381.510 - May the FMCSA end a pilot program before its scheduled completion date?
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 5 2013-10-01 2013-10-01 false May the FMCSA end a pilot program before its scheduled completion date? 381.510 Section 381.510 Transportation Other Regulations Relating to... Pilot Programs § 381.510 May the FMCSA end a pilot program before its scheduled completion date? The...
49 CFR 381.510 - May the FMCSA end a pilot program before its scheduled completion date?
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 5 2014-10-01 2014-10-01 false May the FMCSA end a pilot program before its scheduled completion date? 381.510 Section 381.510 Transportation Other Regulations Relating to... Pilot Programs § 381.510 May the FMCSA end a pilot program before its scheduled completion date? The...
Assessing Weapon System Acquisition Cycle Times: Setting Program Schedules
2015-06-01
additional research, focused as follows: 1 . Acquisition schedule development: How are schedules for acquisition programs actually set and how are they...the germinating requirements documents specific to systems reviewed. A clear statement was found for only one system (Air and Missile Defense Radar...AMDR) when specific threat capabilities were projected to be operational. • Program schedule setting varies in rigor: 1 Up to the interim version of
High voltage interactions of a sounding rocket with the ambient and system-generated environments
NASA Technical Reports Server (NTRS)
Kuharski, Robert A.; Jongeward, Gary A.; Wilcox, Katherine G.; Rankin, Thomas V.; Roche, James C.
1990-01-01
EPSAT (environment power system analysis tool) is used to examine the design of SPEAR III, which is scheduled to fly in early 1991. It will test high-voltage designs in both ambient and system-generated environments. Two of the key questions that the experiment hopes to address are whether or not the earth's magnetic field can cause the current that a high-voltage object draws from the plasma to be far less than the current that would be drawn in the absence of the magnetic field and under what neutral environmental conditions a discharge from the high-voltage object to the plasma will occur. The EPSAT program makes it possible to perform a variety of analyses on a preliminary or conceptual-level description of a system in a short period of time. The calculations presented on SPEAR III are all done for a conceptual-level description. The calculations indicate that the experiment will produce the conditions necessary to address these questions.
Code of Federal Regulations, 2010 CFR
2010-04-01
... between two licensed pharmacists and the transferring pharmacist records the following information: (i... transferred and the name of the pharmacist receiving the prescription information. (iii) Record the date of the transfer and the name of the pharmacist transferring the information. (b) The pharmacist receiving...
Perry, J C; O'Connell, M E; Drake, R
1984-11-01
The authors assessed the reliability and validity of the DSM-III criteria for schizotypal personality disorder (SPD) and their measurement by the Schedule for Schizotypal Personalities (SSP) developed by Baron. Additional criteria not in DSM-III were also explored. Consensual clinical ratings of videotaped interviews of subjects were used to validate item content of the SSP and the schizotypal diagnosis. The SSP assessments, with the exception of odd speech, were found to be reliable and valid. Higher cutoff scores than those recommended by Baron may be helpful in discriminating schizotypal from other psychiatric patients. Six of eight DSM-III criteria and all experimental criteria were highly specific for SPD cases but varied widely in their sensitivities. Based on these pilot data, the authors recommend combining all of the criteria into four conceptual categories: 1) self-report cognitive-perceptual disturbances, 2) observable disorders of thought and communication, 3) deficits in drive or affect, and 4) interpersonal difficulties. When three of these were required to make the SPD diagnosis, all of the subjects in the present data set were correctly identified.
47 CFR 73.671 - Educational and informational programming for children.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., specials, PSAs, short-form programs, and regularly scheduled non-weekly programs with a significant purpose..., specials, PSAs, short-form programs, and regularly scheduled non-weekly programs with a significant purpose...
Space station payload operations scheduling with ESP2
NASA Technical Reports Server (NTRS)
Stacy, Kenneth L.; Jaap, John P.
1988-01-01
The Mission Analysis Division of the Systems Analysis and Integration Laboratory at the Marshall Space Flight Center is developing a system of programs to handle all aspects of scheduling payload operations for Space Station. The Expert Scheduling Program (ESP2) is the heart of this system. The task of payload operations scheduling can be simply stated as positioning the payload activities in a mission so that they collect their desired data without interfering with other activities or violating mission constraints. ESP2 is an advanced version of the Experiment Scheduling Program (ESP) which was developed by the Mission Integration Branch beginning in 1979 to schedule Spacelab payload activities. The automatic scheduler in ESP2 is an expert system that embodies the rules that expert planners would use to schedule payload operations by hand. This scheduler uses depth-first searching, backtracking, and forward chaining techniques to place an activity so that constraints (such as crew, resources, and orbit opportunities) are not violated. It has an explanation facility to show why an activity was or was not scheduled at a certain time. The ESP2 user can also place the activities in the schedule manually. The program offers graphical assistance to the user and will advise when constraints are being violated. ESP2 also has an option to identify conflict introduced into an existing schedule by changes to payload requirements, mission constraints, and orbit opportunities.
Science Writer's Guide to Landsat 7
NASA Technical Reports Server (NTRS)
1999-01-01
The Earth Observing System (EOS), the centerpiece of NASA's Earth science program, is a suite of spacecraft and interdisciplinary science investigations dedicated to advancing our understanding of global change. The flagship EOS satellite, Terra (formerly EOS AM-1), scheduled for launch in July 1999, will provide key measurements of the physical and radiative properties of clouds; air-land and air-sea exchanges of energy, carbon, and water; trace gases; and volcanoes. Flying in formation with Terra, Landsat 7 will make global high spatial resolution measurements of land surface and surrounding coastal regions. Other upcoming EOS missions and instruments include QuikSCAT, to collect sea surface wind data; the Stratospheric Gas and Aerosol Experiment (SAGE III), to create global profiles of key atmospheric gases; and the Active Cavity Radiometer Irradiance Monitors (ACRIM) to measure the energy output of the Sun. The second of the major, multi-instrument EOS platforms, PM-1, is scheduled for launch in 2000. Interdisciplinary research projects sponsored by EOS use specific Earth science data sets for a broader investigation into the function of Earth systems. Current EOS research spans a wide range of sciences, including atmospheric chemistry, hydrology, land use, and marine ecosystems. The EOS program has been managed since 1990 by the Goddard Space Flight Center in Greenbelt, Md., for NASA's Office of Earth Science in Washington, D. C. Additional information on the program can be found on the EOS Project Science Office Web site (http://eospso.gsfc.nasa.gov).
Study of Alternate Space Shuttle Concepts. Volume 2, Part 2: Concept Analysis and Definition
NASA Technical Reports Server (NTRS)
1971-01-01
This is the final report of a Phase A Study of Alternate Space Shuttle Concepts by the Lockheed Missiles & Space Company (LMSC) for the National Aeronautics and Space Administration George C. Marshall Space Flight Center (MSFC). The eleven-month study, which began on 30 June 1970, is to examine the stage-and-one-half and other Space Shuttle configurations and to establish feasibility, performance, cost, and schedules for the selected concepts. This final report consists of four volumes as follows: Volume I - Executive Summary, Volume II - Concept Analysis and Definition, Volume III - Program Planning, and Volume IV - Data Cost Data. This document is Volume II, Concept Analysis and Definition.
Scheduling Nonconsumable Resources
NASA Technical Reports Server (NTRS)
Porta, Harry J.
1990-01-01
Users manual describes computer program SWITCH that schedules use of resources - by appliances switched on and off and use resources while they are on. Plans schedules according to predetermined goals; revises schedules when new goals imposed. Program works by depth-first searching with strict chronological back-tracking. Proceeds to evaluate alternatives as necessary, sometimes interacting with user.
Fixed Schedules Can Support 21st-Century Skills
ERIC Educational Resources Information Center
Formanack, Gail; Pietsch, Laura
2011-01-01
The common belief among school librarians is that a flexibly scheduled school library program as opposed to a fixed schedule program is the best choice. After all, there are distinct advantages to the flexible program: students are served at the point of need, skills are not taught in isolation, and collaborative lessons are developed with…
Patient Care Coordinator | Center for Cancer Research
PROGRAM DESCRIPTION Within the Leidos Biomedical Research Inc.’s Clinical Research Directorate, the Clinical Monitoring Research Program (CMRP) provides high-quality comprehensive and strategic operational support to the high-profile domestic and international clinical research initiatives of the National Cancer Institute (NCI), National Institute of Allergy and Infectious Diseases (NIAID), Clinical Center (CC), National Institute of Heart, Lung and Blood Institute (NHLBI), National Institute of Arthritis and Musculoskeletal and Skin Diseases (NIAMS), National Center for Advancing Translational Sciences (NCATS), National Institute of Neurological Disorders and Stroke (NINDS), and the National Institute of Mental Health (NIMH). Since its inception in 2001, CMRP’s ability to provide rapid responses, high-quality solutions, and to recruit and retain experts with a variety of backgrounds to meet the growing research portfolios of NCI, NIAID, CC, NHLBI, NIAMS, NCATS, NINDS, and NIMH has led to the considerable expansion of the program and its repertoire of support services. CMRP’s support services are strategically aligned with the program’s mission to provide comprehensive, dedicated support to assist National Institutes of Health researchers in providing the highest quality of clinical research in compliance with applicable regulations and guidelines, maintaining data integrity, and protecting human subjects. For the scientific advancement of clinical research, CMRP services include comprehensive clinical trials, regulatory, pharmacovigilance, protocol navigation and development, and programmatic and project management support for facilitating the conduct of 400+ Phase I, II, and III domestic and international trials on a yearly basis. These trials investigate the prevention, diagnosis, treatment of, and therapies for cancer, influenza, HIV, and other infectious diseases and viruses such as hepatitis C, tuberculosis, malaria, and Ebola virus; heart, lung, and blood diseases and conditions; parasitic infections; rheumatic and inflammatory diseases; and rare and neglected diseases. CMRP’s collaborative approach to clinical research and the expertise and dedication of staff to the continuation and success of the program’s mission has contributed to improving the overall standards of public health on a global scale. The Clinical Monitoring Research Program (CMRP) provides comprehensive, dedicated clinical research, study coordination, and administrative support to the National Cancer Institute’s (NCI’s), Center for Cancer Research (CCR), Urologic Oncology Branch (UOB) located at the National Institutes of Health (NIH) in Bethesda, Maryland. KEY ROLES/RESPONSIBILITIES - THIS POSITION IS CONTINGENT UPON FUNDING APPROVAL The Patient Care Coordinator III (PCC III) provides administrative services, as well as patient care coordination. Responsibilities will include: Communicates with various clinical administrative support offices/clinics/diagnostic centers concerning scheduling of patient appointments, new and existing work scopes and clinical protocols (Surgery, X-ray, etc.). Consults with the patient, chooses the appropriate appointment, and enters ID and demographic data supplied by patient to secure an appointment in order to update clinic and physician schedules. Composes correspondence on various administrative issues including patient letters and notices to the patient’s home and physicians. Provides patients with information about their appointments, including medical materials the patient will need to bring, dates and times, clinic information, hospital maps and appropriate travel and hotel information. Arranges Admission Travel Voucher (ATV) travel, including lodging, meals and direct bill requests and enters data in the ATV system daily. Obtains up-to-date patient records and other pertinent information prior to patient appointments or admission. Maintains a roster of all patients and tracks their appointments. Attends weekly meetings and schedules surgeries and all clinic visits. Helps coordinate new patient screening appointments between protocol investigators and the outpatient clinic scheduling staff. Enters/updates clinic and/or physician appointment schedule availability into the central appointment computer. Maintains the patient database, patient education folders and status board for clinic patients. Answers incoming calls and routes to appropriate staff. Acts as a liaison between physicians, nursing staff and other departments. Collects outside CT scans and pathology slides, records arrival times, and completes appropriate requests to be read by NIH personnel. Delivers slides/blocks to pathology for review and films to the film library. Designs and sets up filing systems and office procedures. Files routine patient information, tests, reports, etc. into patient research records. Maintains relevant documents and e-documents that are easily accessible for reference. This position will be located in Bethesda, Maryland.
Patient Care Coordinator | Center for Cancer Research
PROGRAM DESCRIPTION Within the Leidos Biomedical Research Inc.’s Clinical Research Directorate, the Clinical Monitoring Research Program (CMRP) provides high-quality comprehensive and strategic operational support to the high-profile domestic and international clinical research initiatives of the National Cancer Institute (NCI), National Institute of Allergy and Infectious Diseases (NIAID), Clinical Center (CC), National Institute of Heart, Lung and Blood Institute (NHLBI), National Institute of Arthritis and Musculoskeletal and Skin Diseases (NIAMS), National Center for Advancing Translational Sciences (NCATS), National Institute of Neurological Disorders and Stroke (NINDS), and the National Institute of Mental Health (NIMH). Since its inception in 2001, CMRP’s ability to provide rapid responses, high-quality solutions, and to recruit and retain experts with a variety of backgrounds to meet the growing research portfolios of NCI, NIAID, CC, NHLBI, NIAMS, NCATS, NINDS, and NIMH has led to the considerable expansion of the program and its repertoire of support services. CMRP’s support services are strategically aligned with the program’s mission to provide comprehensive, dedicated support to assist National Institutes of Health researchers in providing the highest quality of clinical research in compliance with applicable regulations and guidelines, maintaining data integrity, and protecting human subjects. For the scientific advancement of clinical research, CMRP services include comprehensive clinical trials, regulatory, pharmacovigilance, protocol navigation and development, and programmatic and project management support for facilitating the conduct of 400+ Phase I, II, and III domestic and international trials on a yearly basis. These trials investigate the prevention, diagnosis, treatment of, and therapies for cancer, influenza, HIV, and other infectious diseases and viruses such as hepatitis C, tuberculosis, malaria, and Ebola virus; heart, lung, and blood diseases and conditions; parasitic infections; rheumatic and inflammatory diseases; and rare and neglected diseases. CMRP’s collaborative approach to clinical research and the expertise and dedication of staff to the continuation and success of the program’s mission has contributed to improving the overall standards of public health on a global scale. The Clinical Monitoring Research Program (CMRP) provides comprehensive, dedicated clinical research, study coordination, and administrative support to the National Cancer Institute’s (NCI’s), Office of the Clinical Director/Medical Oncology Service, Hematology Oncology Fellowship located at the National Institutes of Health (NIH) in Bethesda, Maryland. KEY ROLES/RESPONSIBILITIES - THIS POSITION IS CONTINGENT UPON FUNDING APPROVAL The Patient Care Coordinator III (PCC III) provides administrative services, as well as patient care coordination. Responsibilities will include: Acts as a liaison between fellows and fellowship director, research nurses and teams, clinic staff and other departments. Communicates with various clinical administrative support offices/clinics/diagnostic centers concerning scheduling of patient appointments, new and existing work scopes and clinical protocols (Surgery, X-ray, etc.). Consults with the fellow and patient, chooses the appropriate appointment, and enters ID and demographic data supplied by patient to secure an appointment in order to update clinic and physician schedules. Composes correspondence on various administrative issues including patient letters and notices to the patient’s home and physicians. Provides patients with information about their appointments, including medical materials the patient will need to bring, dates and times, clinic information, hospital maps and appropriate travel and hotel information. Arranges Admission Travel Voucher (ATV) travel, including lodging, meals and direct bill requests and enters data in the ATV system daily. Obtains up-to-date patient records and other pertinent information prior to patient appointments or admission. Maintains a roster of all patients and tracks their appointments. Attends weekly meetings and schedules surgeries and all clinic visits. Helps coordinate new patient screening appointments between protocol investigators and the outpatient clinic scheduling staff. Enters/updates clinic and/or physician appointment schedule availability into the central appointment computer. Maintains the patient database, patient education folders and status board for clinic patients. Answers incoming calls and routes to appropriate staff. Designs and sets up filing systems and office procedures. Files routine patient information, tests, reports, etc. into patient research records. Maintains relevant documents and e-documents that are easily accessible for reference. This position will be located in Bethesda, Maryland.
Use of computerized interview scheduling program for pediatric surgery match applicants.
Stephens, Caroline Q; Hamilton, Nicholas A; Thompson, Ann E; Krishnaswami, Sanjay
2017-06-01
Pediatric surgery fellowship applicants and programs coordinate over 20 interviews per cycle. We hypothesized that replacing e-mail and phone communication with a computerized-scheduling program (CSP) could benefit both parties. We used a CSP to schedule 2016 interviews. Time to schedule and e-mail communication per applicant was compared to 2015, when traditional scheduling was used. Additionally, 2016 interviewees were surveyed about their experience with the CSP vs. traditional means. Analysis was performed using descriptive statistics and a Student's T-test. We found a significant decrease in mean scheduling time from 14.4 to 1.7h (p<0.001) and in e-mails exchanged from 3.4 to 1.0 (p<0.0001). Survey respondents reported 92% satisfaction with the CSP, and 87% found it easier to schedule interviews. Applicants also reported quicker finalization of interview dates (96%), improved access to interview slots (71%), and easier coordination of additional services and time off (63%). Notably, the mean longest time reported to schedule interviews using traditional methods was 7days (range 1-30). Overall, 84% supported widespread adoption of CSPs. Using CSPs improved the scheduling process for the significant majority of interviewees, and our program. If widely adopted, this could greatly improve the efficiency of pediatric surgery interview scheduling. N/A. Copyright © 2017 Elsevier Inc. All rights reserved.
The integrated scheduling system: A case study in project management
NASA Technical Reports Server (NTRS)
Bishop, Peter C.; Learned, David B.; Yoes, Cissy A.
1989-01-01
A prototype project management system was developed for the Level III Project Office for the Space Station Freedom. The main goal was to establish a framework for the Space Station Project Office whereby Project and Office Managers can jointly establish and review scheduled milestones and activities. The objective was to assist office managers in communicating their objectives, milestones, schedules, and other project information more effectively and efficiently. Consideration of sophisticated project management systems was included, but each of the systems had limitations in meeting the stated objectives.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-20
...)-(iii) is intended to work together with, and serve as a cross-reference to, rules proposed by the... Documentation proposal, proposed Sec. 23.504(b)(3)(iii) and (iv) are intended to work together with rules... require that SDs or MSPs work with their non-registrant counterparties to comply with these requirements...
An Interactive Decision Support System for Scheduling Fighter Pilot Training
2002-03-26
Deitel , H.M. and Deitel , P.J. C: How to Program , 2nd ed., Prentice Hall, 1994. 8. Deitel , H.M. and Deitel , P.J. How to Program Java...Visual Basic Programming language, the Excel tool is modified in several ways. Scheduling Dispatch rules are implemented to automatically generate... programming language, the Excel tool was modified in several ways. Scheduling dispatch rules are implemented to automatically generate
VAXELN Experimentation: Programming a Real-Time Periodic Task Dispatcher Using VAXELN Ada 1.1
1987-11-01
synchronization to the SQM and VAXELN semaphores. Based on real-time scheduling theory, the optimal rate-monotonic scheduling algorithm [Lui 73...schedulability test based on the rate-monotonic algorithm , namely task-lumping [Sha 871, was necessary to cal- culate the theoretically expected schedulability...8217 Guide Digital Equipment Corporation, Maynard, MA, 1986. [Lui 73] Liu, C.L., Layland, J.W. Scheduling Algorithms for Multi-programming in a Hard-Real-Time
ERIC Educational Resources Information Center
Patterson, Robert K.; Kass, Susan H.
A project to coordinate the scheduling of allied health occupations students for clinical practice or externship experiences in Southeast Florida is described. A model clinical facility utilization and time schedule matrix was developed for four programs: the physical therapy programs at Florida International University (FIU) and the University of…
Lancelot, Renaud; Domenech, Joseph; Lesnoff, Matthieu
2018-01-01
Background Peste des petits ruminants (PPR) is a highly contagious and widespread viral infection of small ruminants (goats and sheep), causing heavy economic losses in many developing countries. Therefore, its progressive control and global eradication by 2030 was defined as a priority by international organizations addressing animal health. The control phase of the global strategy is based on mass vaccination of small ruminant populations in endemic regions or countries. It is estimated that a 70% post-vaccination immunity rate (PVIR) is needed in a given epidemiological unit to prevent PPR virus spread. However, implementing mass vaccination is difficult and costly in smallholder farming systems with scattered livestock and limited facilities. Regarding this, controlling PPR is a special challenge in sub-Saharan Africa. In this study, we focused on this region to assess the effect of several variables of PVIR in two contrasted smallholder farming systems. Methods Using a seasonal matrix population model of PVIR, we estimated its decay in goats reared in sub-humid areas, and sheep reared in semi-arid areas, over a 4-year vaccination program. Assuming immunologically naive and PPR-free epidemiological unit, we assessed the ability of different vaccination scenarios to reach the 70% PVIR throughout the program. The tested scenarios differed in i) their overall schedule, ii) their delivery month and iii) their vaccination coverage. Results In sheep reared in semi-arid areas, the vaccination month did affect the PVIR decay though it did not in goats in humid regions. In both cases, our study highlighted i) the importance of targeting the whole eligible population at least during the two first years of the vaccination program and ii) the importance of reaching a vaccination coverage as high as 80% of this population. This study confirmed the relevance of the vaccination schedules recommended by international organizations. PMID:29351277
Preliminary design report for OTEC stationkeeping subsystems (SKSS)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-12-12
Lockheed Ocean Systems with IMODCO prepared these preliminary designs for OTEC Stationkeeping Subsystems (SKSS) under contract to NOAA in support of the Department of Energy OTEC program. The results of Tasks III, V, and VI are presented in this design report. The report consists of five sections: introduction, preliminary designs for the multiple anchor leg (MAL) and tension anchor leg (TAL), costs and schedule, and conclusions. Extensive appendixes provide detailed descriptions of design methodology and include backup calculations and data to support the results presented. The objective of this effort is to complete the preliminary designs for the barge-MAL andmore » Spar-TAL SKSS. A set of drawings is provided for each which show arrangements, configuration, component details, engineering description, and deployment plan. Loads analysis, performance assessment, and sensitivity to requirements are presented, together with the methodology employed to analyze the systems and to derive the results presented. Life cycle costs and schedule are prepared and compared on a common basis. Finally, recommendations for the Commercial Plant SKSS are presented for both platform types.« less
14 CFR Section 25 - Traffic and Capacity Elements
Code of Federal Regulations, 2010 CFR
2010-01-01
... section 1-2 of this part, to use hardcopy data input forms or submit data via e-mail. Schedule T-8—Report... mail in scheduled and nonscheduled service; and (iii) Transport-related revenues. (2) Total operating... transported (F, G, L, N, P, R237)(in lbs). 13 63-72 10N Revenue mail transported (F, G, L, N, P, R239) (in lbs...
1L Mark-IV Target Design Review
DOE Office of Scientific and Technical Information (OSTI.GOV)
Koehler, Paul E.
This presentation includes General Design Considerations; Current (Mark-III) Lower Tier; Mark-III Upper Tier; Performance Metrics; General Improvements for Material Science; General Improvements for Nuclear Science; Improving FOM for Nuclear Science; General Design Considerations Summary; Design Optimization Studies; Expected Mark-IV Performance: Material Science; Expected Mark-IV Performance: Nuclear Science (Disk); Mark IV Enables Much Wider Range of Nuclear-Science FOM Gains than Mark III; Mark-IV Performance Summary; Rod or Disk? Center or Real FOV?; and Project Cost and Schedule.
McGerald, Genevieve; Dvorkin, Ronald; Levy, David; Lovell-Rose, Stephanie; Sharma, Adhi
2009-06-01
Prescriptions for controlled substances decrease when regulatory barriers are put in place. The converse has not been studied. The objective was to determine whether a less complicated prescription writing process is associated with a change in the prescribing patterns of controlled substances in the emergency department (ED). The authors conducted a retrospective nonconcurrent cohort study of all patients seen in an adult ED between April 19, 2005, and April 18, 2007, who were discharged with a prescription. Prior to April 19, 2006, a specialized prescription form stored in a locked cabinet was obtained from the nursing staff to write a prescription for benzodiazepines or Schedule II opioids. After April 19, 2006, New York State mandated that all prescriptions, regardless of schedule classification, be generated on a specialized bar-coded prescription form. The main outcome of the study was to compare the proportion of Schedule III-V opioids to Schedule II opioids and benzodiazepines prescribed in the ED before and after the introduction of a less cumbersome prescription writing process. Of the 26,638 charts reviewed, 2.1% of the total number of prescriptions generated were for a Schedule II controlled opioid before the new system was implemented compared to 13.6% after (odds ratio [OR] = 7.3, 95% confidence interval [CI] = 6.4 to 8.4). The corresponding percentages for Schedule III-V opioids were 29.9% to 18.1% (OR = 0.52, 95% CI = 0.49 to 0.55) and for benzodiazepines 1.4% to 3.9% (OR = 2.8, 95% CI = 2.4 to 3.4). Patients were more likely to receive a prescription for a Schedule II opioid or a benzodiazepine after a more streamlined computer-generated prescription writing process was introduced in this ED. (c) 2009 by the Society for Academic Emergency Medicine.
Earth Observing System (EOS) Advanced Microwave Sounding Unit-A (AMSU-A) schedule plan
NASA Technical Reports Server (NTRS)
1994-01-01
This report describes Aerojet's methods and procedures used to control and administer contractual schedules for the EOS/AMSU-A program. Included are the following: the master, intermediate, and detail schedules; critical path analysis; and the total program logic network diagrams.
Guidelines for successful self-scheduling on nursing units.
Russell, Elizabeth; Hawkins, Jenna; Arnold, Kara A
2012-09-01
Self-scheduling programs are an increasingly popular strategy utilized by employers to address the individual and organizational challenges resulting from employee work-life imbalance among the nursing workforce. Certain key components will ensure buy-in and support from staff when self-scheduling programs are developed.
Estimating the cost of major ongoing cost plus hardware development programs
NASA Technical Reports Server (NTRS)
Bush, J. C.
1990-01-01
Approaches are developed for forecasting the cost of major hardware development programs while these programs are in the design and development C/D phase. Three approaches are developed: a schedule assessment technique for bottom-line summary cost estimation, a detailed cost estimation approach, and an intermediate cost element analysis procedure. The schedule assessment technique was developed using historical cost/schedule performance data.
A System for Automatically Generating Scheduling Heuristics
NASA Technical Reports Server (NTRS)
Morris, Robert
1996-01-01
The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.
2017-12-01
2-89) Prescribed by ANSI Std. 239-18 ii THIS PAGE INTENTIONALLY LEFT BLANK iii Approved for public release. Distribution is unlimited. COST ...from the scope of this demonstration due to time constraints. Further study of this software would benefit similar cost , schedule, and performance...NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA SYSTEMS ENGINEERING CAPSTONE PROJECT REPORT Approved for public release. Distribution
A Program Master Schedule Can Improve Results
2014-02-01
A Program Master Schedule Can Improve Results Patrick K. Barker “There cannot be a crisis today; my schedule is already full.” —Henry Kissinger...often necessary—for clear communication . However, over-reliance on eye-pleasing graphics risks projecting a false impression of SA over a dy- namic...for poor scheduling discipline, lack of believability and/or poor communication . As the saying goes, garbage in equals garbage out. On the other
21 CFR 1308.13 - Schedule III.
Code of Federal Regulations, 2011 CFR
2011-04-01
... any quantity of the following substances having a depressant effect on the central nervous system: (1... a stimulant effect on the central nervous sxstem, including its salts, isomers (whether optical...
21 CFR 1308.13 - Schedule III.
Code of Federal Regulations, 2014 CFR
2014-04-01
... a stimulant effect on the central nervous system, including its salts, isomers (whether optical... any quantity of the following substances having a depressant effect on the central nervous system: (1...
21 CFR 1308.13 - Schedule III.
Code of Federal Regulations, 2012 CFR
2012-04-01
... a stimulant effect on the central nervous system, including its salts, isomers (whether optical... any quantity of the following substances having a depressant effect on the central nervous system: (1...
21 CFR 1308.13 - Schedule III.
Code of Federal Regulations, 2010 CFR
2010-04-01
... any quantity of the following substances having a depressant effect on the central nervous system: (1... a stimulant effect on the central nervous sxstem, including its salts, isomers (whether optical...
21 CFR 1308.13 - Schedule III.
Code of Federal Regulations, 2013 CFR
2013-04-01
... a stimulant effect on the central nervous system, including its salts, isomers (whether optical... any quantity of the following substances having a depressant effect on the central nervous system: (1...
JCL Implementation On A Human Spaceflight Program
NASA Technical Reports Server (NTRS)
Kulpa, Vyga; Karpowich, Mike; Abel, Diana; Archiable, Wes; Carson, William
2013-01-01
Joint Confidence Level (JCL) analysis focuses on the integration of traditionally stove-piped programmatic components (schedule, cost and risk) to establish projected resource and schedule requirements at various confidence levels and to identify programmatic cost and schedule risk drivers. SLS Program consists of multiple Prime Contractors managed by independent SLS Elements which are integrated using SE&I and Program Management. SLS further integrates with GSDO and MPCV through ESD integrated working groups.
1987-06-01
NAVY OCCUPATIONAL HEALTH INFORMATION MANAGEMENT SYSTEM NOH I MS MEDICAL EXAM SCHEDULING MODULE PROGRAM MAINTENANCE MANUAL S JUNE 1987 DT11C 00... Information Management System (NOHIMS) ~ Medical Examination Scheduling (MES) Program Maintenance Manual 7. Author(s) 8. Performing Organization Rapt. No...the Navy Occupational Health Information Management System (NOHIMS). NOHIMS, whose initial version was developed at the Naval Health Research Center
Evolutionary Scheduler for the Deep Space Network
NASA Technical Reports Server (NTRS)
Guillaume, Alexandre; Lee, Seungwon; Wang, Yeou-Fang; Zheng, Hua; Chau, Savio; Tung, Yu-Wen; Terrile, Richard J.; Hovden, Robert
2010-01-01
A computer program assists human schedulers in satisfying, to the maximum extent possible, competing demands from multiple spacecraft missions for utilization of the transmitting/receiving Earth stations of NASA s Deep Space Network. The program embodies a concept of optimal scheduling to attain multiple objectives in the presence of multiple constraints.
Alonso-Marsden, Shelley; Dodge, Kenneth A; O'Donnell, Karen J; Murphy, Robert A; Sato, Jeannine M; Christopoulos, Christina
2013-08-01
As nurse home visiting to prevent child maltreatment grows in popularity with both program administrators and legislators, it is important to understand engagement in such programs in order to improve their community-wide effects. This report examines family demographic and infant health risk factors that predict engagement and follow-through in a universal home-based maltreatment prevention program for new mothers in Durham County, North Carolina. Trained staff members attempted to schedule home visits for all new mothers during the birthing hospital stay, and then nurses completed scheduled visits three to five weeks later. Medical record data was used to identify family demographic and infant health risk factors for maltreatment. These variables were used to predict program engagement (scheduling a visit) and follow-through (completing a scheduled visit). Program staff members were successful in scheduling 78% of eligible families for a visit and completing 85% of scheduled visits. Overall, 66% of eligible families completed at least one visit. Structural equation modeling (SEM) analyses indicated that high demographic risk and low infant health risk were predictive of scheduling a visit. Both low demographic and infant health risk were predictive of visit completion. Findings suggest that while higher demographic risk increases families' initial engagement, it might also inhibit their follow-through. Additionally, parents of medically at-risk infants may be particularly difficult to engage in universal home visiting interventions. Implications for recruitment strategies of home visiting programs are discussed. Copyright © 2013 Elsevier Ltd. All rights reserved.
11 CFR 104.6 - Form and content of internal communications reports (2 U.S.C. 431(9)(B)(iii)).
Code of Federal Regulations, 2010 CFR
2010-01-01
... held; the second process is comprised of all general elections for federal office, wherever and... regularly scheduled general election is held. Such reports shall be filed quarterly in accordance with 11 CFR 104.5(a)(1)(iii) and, with respect to any general election, in accordance with 11 CFR 104.5(a)(1...
Developing optimal nurses work schedule using integer programming
NASA Astrophysics Data System (ADS)
Shahidin, Ainon Mardhiyah; Said, Mohd Syazwan Md; Said, Noor Hizwan Mohamad; Sazali, Noor Izatie Amaliena
2017-08-01
Time management is the art of arranging, organizing and scheduling one's time for the purpose of generating more effective work and productivity. Scheduling is the process of deciding how to commit resources between varieties of possible tasks. Thus, it is crucial for every organization to have a good work schedule for their staffs. The job of Ward nurses at hospitals runs for 24 hours every day. Therefore, nurses will be working using shift scheduling. This study is aimed to solve the nurse scheduling problem at an emergency ward of a private hospital. A 7-day work schedule for 7 consecutive weeks satisfying all the constraints set by the hospital will be developed using Integer Programming. The work schedule for the nurses obtained gives an optimal solution where all the constraints are being satisfied successfully.
FASTER - A tool for DSN forecasting and scheduling
NASA Technical Reports Server (NTRS)
Werntz, David; Loyola, Steven; Zendejas, Silvino
1993-01-01
FASTER (Forecasting And Scheduling Tool for Earth-based Resources) is a suite of tools designed for forecasting and scheduling JPL's Deep Space Network (DSN). The DSN is a set of antennas and other associated resources that must be scheduled for satellite communications, astronomy, maintenance, and testing. FASTER consists of MS-Windows based programs that replace two existing programs (RALPH and PC4CAST). FASTER was designed to be more flexible, maintainable, and user friendly. FASTER makes heavy use of commercial software to allow for customization by users. FASTER implements scheduling as a two pass process: the first pass calculates a predictive profile of resource utilization; the second pass uses this information to calculate a cost function used in a dynamic programming optimization step. This information allows the scheduler to 'look ahead' at activities that are not as yet scheduled. FASTER has succeeded in allowing wider access to data and tools, reducing the amount of effort expended and increasing the quality of analysis.
Project Planning and Reporting
NASA Technical Reports Server (NTRS)
1982-01-01
Project Planning Analysis and Reporting System (PPARS) is automated aid in monitoring and scheduling of activities within project. PPARS system consists of PPARS Batch Program, five preprocessor programs, and two post-processor programs. PPARS Batch program is full CPM (Critical Path Method) scheduling program with resource capabilities. Can process networks with up to 10,000 activities.
DORCA computer program. Volume 1: User's guide
NASA Technical Reports Server (NTRS)
Wray, S. T., Jr.
1971-01-01
The Dynamic Operational Requirements and Cost Analysis Program (DORCA) was written to provide a top level analysis tool for NASA. DORCA relies on a man-machine interaction to optimize results based on external criteria. DORCA relies heavily on outside sources to provide cost information and vehicle performance parameters as the program does not determine these quantities but rather uses them. Given data describing missions, vehicles, payloads, containers, space facilities, schedules, cost values and costing procedures, the program computes flight schedules, cargo manifests, vehicle fleet requirements, acquisition schedules and cost summaries. The program is designed to consider the Earth Orbit, Lunar, Interplanetary and Automated Satellite Programs. A general outline of the capabilities of the program are provided.
1991-07-15
4 Tram Schedule ................................................. 5 Amelia Island.................................................. 6 Program... Schedule .................................................. 7 Scientific Program.................................................. 8 Abstracts...and 5 4 -4- TRAM SCHEDULE 6" I Th)e Ameha Isand Tra-s 5 1 p taior, around teP I da-ly basis f~cn 6 1 5 a -MARSHSIDE Ia m Tra-T Stc-,S a’e -.E TRAM I
Educational Services Directory, 2000-2001.
ERIC Educational Resources Information Center
Louisiana Public Broadcasting, Baton Rouge.
Louisiana Public Broadcasting's (LPB's) Educational Services Directory presents an alphabetical listing of instructional television (ITV) program descriptions, a program schedule, and other educational services information. Sections in this Directory include: ITV Series Descriptions; ITV Broadcast Schedule; Program Content matrix; Going the…
29 CFR 1908.5 - Requests and scheduling for onsite consultation.
Code of Federal Regulations, 2010 CFR
2010-07-01
... following: (i) Paid newspaper advertisements; (ii) Newspaper, magazine, and trade publication articles; (iii... shall be assigned to requests from businesses with the most hazardous operations, with primary attention...
Goal programming for cyclical auxiliary police scheduling at UiTM Cawangan Perlis
NASA Astrophysics Data System (ADS)
Mustapar, Wasilatul Effah; Nasir, Diana Sirmayunie Mohd; Nor, Nor Azriani Mohamad; Abas, Sharifah Fhahriyah Syed
2017-11-01
Constructing a good and fair schedule for shift workers poses a great challenge as it requires a lot of time and effort. In this study, goal programming has been applied on scheduling to achieve the hard and soft constraints for a cyclical schedule that would ease the head of auxiliary police at building new schedules. To accomplish this goal, shift types were assigned in order to provide a fair schedule that takes into account the auxiliary police's policies and preferences. The model was run using Lingo software. Three out of four goals set for the study were achieved. In addition, the results considered an equal allocation for every auxiliary police, namely 70% for total duty and 30% for the day. Furthermore, the schedule was able to cyclically generate another 10 sets schedule. More importantly, the model has provided unbiased scheduling of auxiliary policies which led to high satisfaction in auxiliary police management.
77 FR 43084 - Multiple Award Schedule (MAS) Program Continuous Open Season-Operational Change
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-23
... Award Schedule (MAS) Program Continuous Open Season- Operational Change AGENCY: Federal Acquisition... proposing this operational change to enhance the performance of and modernize the MAS program in three key program areas: Small business viability, operational efficiency, and cost control. The DBM will realign...
Space communications scheduler: A rule-based approach to adaptive deadline scheduling
NASA Technical Reports Server (NTRS)
Straguzzi, Nicholas
1990-01-01
Job scheduling is a deceptively complex subfield of computer science. The highly combinatorial nature of the problem, which is NP-complete in nearly all cases, requires a scheduling program to intelligently transverse an immense search tree to create the best possible schedule in a minimal amount of time. In addition, the program must continually make adjustments to the initial schedule when faced with last-minute user requests, cancellations, unexpected device failures, quests, cancellations, unexpected device failures, etc. A good scheduler must be quick, flexible, and efficient, even at the expense of generating slightly less-than-optimal schedules. The Space Communication Scheduler (SCS) is an intelligent rule-based scheduling system. SCS is an adaptive deadline scheduler which allocates modular communications resources to meet an ordered set of user-specified job requests on board the NASA Space Station. SCS uses pattern matching techniques to detect potential conflicts through algorithmic and heuristic means. As a result, the system generates and maintains high density schedules without relying heavily on backtracking or blind search techniques. SCS is suitable for many common real-world applications.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carlsson, Mats; Johansson, Mikael; Larson, Jeffrey
Previous approaches for scheduling a league with round-robin and divisional tournaments involved decomposing the problem into easier subproblems. This approach, used to schedule the top Swedish handball league Elitserien, reduces the problem complexity but can result in suboptimal schedules. This paper presents an integrated constraint programming model that allows to perform the scheduling in a single step. Particular attention is given to identifying implied and symmetry-breaking constraints that reduce the computational complexity significantly. The experimental evaluation of the integrated approach takes considerably less computational effort than the previous approach.
Sebastião, Emerson; McAuley, Edward; Shigematsu, Ryosuke; Motl, Robert W
2017-09-01
We propose a randomized controlled trial (RCT) examining the feasibility of square-stepping exercise (SSE) delivered as a home-based program for older adults with multiple sclerosis (MS). We will assess feasibility in the four domains of process, resources, management and scientific outcomes. The trial will recruit older adults (aged 60 years and older) with mild-to-moderate MS-related disability who will be randomized into intervention or attention control conditions. Participants will complete assessments before and after completion of the conditions delivered over a 12-week period. Participants in the intervention group will have biweekly meetings with an exercise trainer in the Exercise Neuroscience Research Laboratory and receive verbal and visual instruction on step patterns for the SSE program. Participants will receive a mat for home-based practice of the step patterns, an instruction manual, and a logbook and pedometer for monitoring compliance. Compliance will be further monitored through weekly scheduled Skype calls. This feasibility study will inform future phase II and III RCTs that determine the actual efficacy and effectiveness of a home-based exercise program for older adults with MS.
1988-09-01
scheduler’s knowledge of available employees ’ experience levels. If the scheduler lacks first-hand knowledge of employee experience levels, then assistance ...to start a new system of rotating primary employees and asked that this capability be included in the program . Yet he had only a vague idea 29 about...competitive with the DBASE prototype. The LOTUS 123 program was based around a spreadsheet that contained all the job, employee and schedule form data in a
Exploiting Vector and Multicore Parallelsim for Recursive, Data- and Task-Parallel Programs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ren, Bin; Krishnamoorthy, Sriram; Agrawal, Kunal
Modern hardware contains parallel execution resources that are well-suited for data-parallelism-vector units-and task parallelism-multicores. However, most work on parallel scheduling focuses on one type of hardware or the other. In this work, we present a scheduling framework that allows for a unified treatment of task- and data-parallelism. Our key insight is an abstraction, task blocks, that uniformly handles data-parallel iterations and task-parallel tasks, allowing them to be scheduled on vector units or executed independently as multicores. Our framework allows us to define schedulers that can dynamically select between executing task- blocks on vector units or multicores. We show that thesemore » schedulers are asymptotically optimal, and deliver the maximum amount of parallelism available in computation trees. To evaluate our schedulers, we develop program transformations that can convert mixed data- and task-parallel pro- grams into task block-based programs. Using a prototype instantiation of our scheduling framework, we show that, on an 8-core system, we can simultaneously exploit vector and multicore parallelism to achieve 14×-108× speedup over sequential baselines.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ahrens, J.P.; Shapiro, L.G.; Tanimoto, S.L.
1997-04-01
This paper describes a computing environment which supports computer-based scientific research work. Key features include support for automatic distributed scheduling and execution and computer-based scientific experimentation. A new flexible and extensible scheduling technique that is responsive to a user`s scheduling constraints, such as the ordering of program results and the specification of task assignments and processor utilization levels, is presented. An easy-to-use constraint language for specifying scheduling constraints, based on the relational database query language SQL, is described along with a search-based algorithm for fulfilling these constraints. A set of performance studies show that the environment can schedule and executemore » program graphs on a network of workstations as the user requests. A method for automatically generating computer-based scientific experiments is described. Experiments provide a concise method of specifying a large collection of parameterized program executions. The environment achieved significant speedups when executing experiments; for a large collection of scientific experiments an average speedup of 3.4 on an average of 5.5 scheduled processors was obtained.« less
Cui, Laizhong; Lu, Nan; Chen, Fu
2014-01-01
Most large-scale peer-to-peer (P2P) live streaming systems use mesh to organize peers and leverage pull scheduling to transmit packets for providing robustness in dynamic environment. The pull scheduling brings large packet delay. Network coding makes the push scheduling feasible in mesh P2P live streaming and improves the efficiency. However, it may also introduce some extra delays and coding computational overhead. To improve the packet delay, streaming quality, and coding overhead, in this paper are as follows. we propose a QoS driven push scheduling approach. The main contributions of this paper are: (i) We introduce a new network coding method to increase the content diversity and reduce the complexity of scheduling; (ii) we formulate the push scheduling as an optimization problem and transform it to a min-cost flow problem for solving it in polynomial time; (iii) we propose a push scheduling algorithm to reduce the coding overhead and do extensive experiments to validate the effectiveness of our approach. Compared with previous approaches, the simulation results demonstrate that packet delay, continuity index, and coding ratio of our system can be significantly improved, especially in dynamic environments. PMID:25114968
NASA Schedule Management Handbook
NASA Technical Reports Server (NTRS)
2011-01-01
The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.
2016-03-24
Corporation found that increases in schedule effort tend to be the reason for increases in the cost of acquiring a new weapons system due to, at a minimum...in-depth finance and schedule data for selected programs (Brown et al., 2015). We also give extra focus on Research Development Test & Evaluation...we create and employ an entirely new database. The database we utilize for our research is a database originally built by the RAND Corporation for
Integrated Hybrid System Architecture for Risk Analysis
NASA Technical Reports Server (NTRS)
Moynihan, Gary P.; Fonseca, Daniel J.; Ray, Paul S.
2010-01-01
A conceptual design has been announced of an expert-system computer program, and the development of a prototype of the program, intended for use as a project-management tool. The program integrates schedule and risk data for the purpose of determining the schedule applications of safety risks and, somewhat conversely, the effects of changes in schedules on changes on safety. It is noted that the design has been delivered to a NASA client and that it is planned to disclose the design in a conference presentation.
Distributed Processor/Memory Architectures Design Program
1975-02-01
Event Scheduling Plo 31 Globat LAl Message Input Event Sicheduling Fhou ..... ............... 106 32 It tc Iata Representation...298 138 GEX LEX Scheduling Phlmophy ....... ...................... 300 139 Executive Comirol Herarchy... Scheduler Subroutine lnterrelatiomhips . ..... ................. 312 145 Task Scheduler Message Scatuer. . ...... ....................... 315 146
Laboratory services series: a programmed maintenance system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tuxbury, D.C.; Srite, B.E.
1980-01-01
The diverse facilities, operations and equipment at a major national research and development laboratory require a systematic, analytical approach to operating equipment maintenance. A computer-scheduled preventive maintenance program is described including program development, equipment identification, maintenance and inspection instructions, scheduling, personnel, and equipment history.
A computerized resolution of scheduling conflicts.
Bolinger, R E; McFarlane, M J
1989-01-01
Residency training programs in Internal Medicine require resident attendance in a continuity clinic. This inevitably engenders conflicts between scheduling in the ambulatory clinic and the required teaching activities of the in-patient services. Some of the conflicts can be resolved by allowing the in-patient service directors to indicate preferred plans for their residents to attend in the continuity clinic. With this plan, scheduling becomes quite complicated. A computer program is presented with coordinates these service requests with ambulatory clinic scheduling. As a result, a given resident may have his/her clinic day changed on different rotations. The program automatically arbitrates conflicts and publishes the attendance dates for the entire academic year. This information is supplied to the appointment desk so that patients can be scheduled accordingly. This system has resulted in a 74% continuity rate and improved satisfaction by both residents and staff.
DORCA II: Dynamic operations requirements and cost analysis program
NASA Technical Reports Server (NTRS)
1976-01-01
Program is written to handle logistics of acquisition and transport of personnel, equipment, and services and to determine costs, transport schedules, acquisition schedules, and fuel requirements of cargo transport.
Adapting Scheduling Programs for Educational Specifications.
ERIC Educational Resources Information Center
Glass, Thomas E.
1984-01-01
Planners of a new Arizona school used the district's existing computerized master scheduling program to identify instructional spaces needed. Total classroom needs by subject were translated into total square footage requirements. (MLF)
Code of Federal Regulations, 2011 CFR
2011-10-01
... authorize other agencies to award schedule contracts and publish schedules. For example, the Department of... CONTRACTING FEDERAL SUPPLY SCHEDULE CONTRACTING Federal Supply Schedule Program 38.101 General. (a) The... discounts. Indefinite-delivery contracts are awarded using competitive procedures to firms. The firms...
Scheduling the resident 80-hour work week: an operations research algorithm.
Day, T Eugene; Napoli, Joseph T; Kuo, Paul C
2006-01-01
The resident 80-hour work week requires that programs now schedule duty hours. Typically, scheduling is performed in an empirical "trial-and-error" fashion. However, this is a classic "scheduling" problem from the field of operations research (OR). It is similar to scheduling issues that airlines must face with pilots and planes routing through various airports at various times. The authors hypothesized that an OR approach using iterative computer algorithms could provide a rational scheduling solution. Institution-specific constraints of the residency problem were formulated. A total of 56 residents are rotating through 4 hospitals. Additional constraints were dictated by the Residency Review Committee (RRC) rules or the specific surgical service. For example, at Hospital 1, during the weekday hours between 6 am and 6 pm, there will be a PGY4 or PGY5 and a PGY2 or PGY3 on-duty to cover Service "A." A series of equations and logic statements was generated to satisfy all constraints and requirements. These were restated in the Optimization Programming Language used by the ILOG software suite for solving mixed integer programming problems. An integer programming solution was generated to this resource-constrained assignment problem. A total of 30,900 variables and 12,443 constraints were required. A total of man-hours of programming were used; computer run-time was 25.9 hours. A weekly schedule was generated for each resident that satisfied the RRC regulations while fulfilling all stated surgical service requirements. Each required between 64 and 80 weekly resident duty hours. The authors conclude that OR is a viable approach to schedule resident work hours. This technique is sufficiently robust to accommodate changes in resident numbers, service requirements, and service and hospital rotations.
Software For Integer Programming
NASA Technical Reports Server (NTRS)
Fogle, F. R.
1992-01-01
Improved Exploratory Search Technique for Pure Integer Linear Programming Problems (IESIP) program optimizes objective function of variables subject to confining functions or constraints, using discrete optimization or integer programming. Enables rapid solution of problems up to 10 variables in size. Integer programming required for accuracy in modeling systems containing small number of components, distribution of goods, scheduling operations on machine tools, and scheduling production in general. Written in Borland's TURBO Pascal.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-15
... Title III of the Higher Education Act of 1965, as Amended (HEA), and Programs Under Title V of the HEA...: Programs authorized under Part A, Title III of the HEA: Strengthening Institutions Program (Part A SIP... AANAPISI). Programs authorized under Part F, Title III of the HEA: Hispanic- Serving Institutions Stem and...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-14
... Title III of the Higher Education Act of 1965, as Amended (HEA), and Programs Under Title V of the HEA...: Programs authorized under Part A, Title III of the HEA: Strengthening Institutions Program (Part A SIP...). Programs authorized under Part F, Title III of the HEA: Hispanic- Serving Institutions STEM and...
77 FR 12622 - Records Schedules; Availability and Request for Comments
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-01
... chemical weapons convention program records and protocol program records. 3. Department of Defense, Defense... disposition process is available on request. Schedules Pending 1. Department of the Army, Agency-wide (N1-AU... programs, housing, recreation, and travel. 2. Department of Commerce, Bureau of Industry and Security, (N1...
Computer Technology and Its Impact on Recreation and Sport Programs.
ERIC Educational Resources Information Center
Ross, Craig M.
This paper describes several types of computer programs that can be useful to sports and recreation programs. Computerized tournament scheduling software is helpful to recreation and parks staff working with tournaments of 50 teams/individuals or more. Important features include team capacity, league formation, scheduling conflicts, scheduling…
40 CFR 123.45 - Noncompliance and program reporting by the Director.
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) WATER PROGRAMS STATE PROGRAM REQUIREMENTS Transfer of Information and Permit Review § 123.45... schedule report for final compliance or a monitoring report. This applies when the permittee has failed to submit a final compliance schedule progress report, pretreatment report, or a Discharge Monitoring Report...
40 CFR 123.45 - Noncompliance and program reporting by the Director.
Code of Federal Regulations, 2012 CFR
2012-07-01
... (CONTINUED) WATER PROGRAMS STATE PROGRAM REQUIREMENTS Transfer of Information and Permit Review § 123.45... schedule report for final compliance or a monitoring report. This applies when the permittee has failed to submit a final compliance schedule progress report, pretreatment report, or a Discharge Monitoring Report...
40 CFR 123.45 - Noncompliance and program reporting by the Director.
Code of Federal Regulations, 2011 CFR
2011-07-01
... (CONTINUED) WATER PROGRAMS STATE PROGRAM REQUIREMENTS Transfer of Information and Permit Review § 123.45... schedule report for final compliance or a monitoring report. This applies when the permittee has failed to submit a final compliance schedule progress report, pretreatment report, or a Discharge Monitoring Report...
40 CFR 123.45 - Noncompliance and program reporting by the Director.
Code of Federal Regulations, 2013 CFR
2013-07-01
... (CONTINUED) WATER PROGRAMS STATE PROGRAM REQUIREMENTS Transfer of Information and Permit Review § 123.45... schedule report for final compliance or a monitoring report. This applies when the permittee has failed to submit a final compliance schedule progress report, pretreatment report, or a Discharge Monitoring Report...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-20
... Committee, Negotiator Nominations and Schedule of Committee Meetings--Title IV Federal Student Aid Programs... the Federal Student Aid programs authorized under title IV of the Higher Education Act of 1965, as amended (HEA) (title IV Federal Student Aid programs). The committee will include representatives of...
A survey of planning and scheduling research at the NASA Ames Research Center
NASA Technical Reports Server (NTRS)
Zweben, Monte
1989-01-01
NASA Ames Research Center has a diverse program in planning and scheduling. Some research projects as well as some applications are highlighted. Topics addressed include machine learning techniques, action representations and constraint-based scheduling systems. The applications discussed are planetary rovers, Hubble Space Telescope scheduling, and Pioneer Venus orbit scheduling.
NASA Technical Reports Server (NTRS)
Chamberlain, R. A.; Cornick, D. E.; Flater, J. F.; Odoherty, R. J.; Peterson, F. M.; Ramsey, H. R.; Willoughby, J. K.
1974-01-01
The capabilities of the specified scheduling language and the program module library are outlined. The summary is written with the potential user in mind and, therefore, provides maximum insight on how the capabilities will be helpful in writing scheduling programs. Simple examples and illustrations are provided to assist the potential user in applying the capabilities of his problem.
Planning and scheduling for success
NASA Technical Reports Server (NTRS)
Manzanera, Ignacio
1994-01-01
Planning and scheduling programs are excellent management tools when properly introduced to the project management team and regularly maintained. Communications, creativity, flexibility and accuracy are substantially improved by following a simple set of rules. A planning and scheduling program will work for you if you believe in it, make others in your project team realize its benefits, and make it an extension of your project cost control philosophy.
User's Guide for the Interactive Scheduling Program : Preliminary Calendar Version
DOT National Transportation Integrated Search
1978-08-01
The Office of Transportation Management of the Urban Mass Transportation Administration (UMTA), in conjunction with the Transportation Systems Center (TSC), designed and developed the Interactive Scheduling Program (ISP) to assist rail-transit operat...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-23
... positive nitrogen balance and protein metabolism, resulting in increases in protein synthesis and lean body... nitrogen balance and androgenic activity based on weight changes of the ventral prostrate of prostanozol...
Atmospheric Science Data Center
2017-11-15
... data has historically been used by the World Meteorological Organization to inform their periodic assessments of ozone depletion. These new ... follow a monthly release schedule. SAGE III-ISS information is provided in the V5 Release Notes , Data Products User's ...
76 FR 20010 - Layfe Robert Anthony, M.D.; Denial of Application
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-11
... this provision, the Government maintains that his registration has continued in effect.\\1\\ It has not... testosterone, a schedule III steroid) for review by the Division, id. at 21-22; that he had committed...
Scheduling language and algorithm development study. Volume 1: Study summary and overview
NASA Technical Reports Server (NTRS)
1974-01-01
A high level computer programming language and a program library were developed to be used in writing programs for scheduling complex systems such as the space transportation system. The objectives and requirements of the study are summarized and unique features of the specified language and program library are described and related to the why of the objectives and requirements.
Automatic programming via iterated local search for dynamic job shop scheduling.
Nguyen, Su; Zhang, Mengjie; Johnston, Mark; Tan, Kay Chen
2015-01-01
Dispatching rules have been commonly used in practice for making sequencing and scheduling decisions. Due to specific characteristics of each manufacturing system, there is no universal dispatching rule that can dominate in all situations. Therefore, it is important to design specialized dispatching rules to enhance the scheduling performance for each manufacturing environment. Evolutionary computation approaches such as tree-based genetic programming (TGP) and gene expression programming (GEP) have been proposed to facilitate the design task through automatic design of dispatching rules. However, these methods are still limited by their high computational cost and low exploitation ability. To overcome this problem, we develop a new approach to automatic programming via iterated local search (APRILS) for dynamic job shop scheduling. The key idea of APRILS is to perform multiple local searches started with programs modified from the best obtained programs so far. The experiments show that APRILS outperforms TGP and GEP in most simulation scenarios in terms of effectiveness and efficiency. The analysis also shows that programs generated by APRILS are more compact than those obtained by genetic programming. An investigation of the behavior of APRILS suggests that the good performance of APRILS comes from the balance between exploration and exploitation in its search mechanism.
Dosing Schedules for Pneumococcal Conjugate Vaccine
2014-01-01
Since second generation pneumococcal conjugate vaccines (PCVs) targeting 10 and 13 serotypes became available in 2010, the number of national policy makers considering these vaccines has steadily increased. An important consideration for a national immunization program is the timing and number of doses—the schedule—that will best prevent disease in the population. Data on disease epidemiology and the efficacy or effectiveness of PCV schedules are typically considered when choosing a schedule. Practical concerns, such as the existing vaccine schedule, and vaccine program performance are also important. In low-income countries, pneumococcal disease and deaths typically peak well before the end of the first year of life, making a schedule that provides PCV doses early in life (eg, a 6-, 10- and 14-week schedule) potentially the best option. In other settings, a schedule including a booster dose may address disease that peaks in the second year of life or may be seen to enhance a schedule already in place. A large and growing body of evidence from immunogenicity studies, as well as clinical trials and observational studies of carriage, pneumonia and invasive disease, has been systematically reviewed; these data indicate that schedules of 3 or 4 doses all work well, and that the differences between these regimens are subtle, especially in a mature program in which coverage is high and indirect (herd) effects help enhance protection provided directly by a vaccine schedule. The recent World Health Organization policy statement on PCVs endorsed a schedule of 3 primary doses without a booster or, as a new alternative, 2 primary doses with a booster dose. While 1 schedule may be preferred in a particular setting based on local epidemiology or practical considerations, achieving high coverage with 3 doses is likely more important than the specific timing of doses. PMID:24336059
Scheduling with Automatic Resolution of Conflicts
NASA Technical Reports Server (NTRS)
Clement, Bradley; Schaffer, Steve
2006-01-01
DSN Requirement Scheduler is a computer program that automatically schedules, reschedules, and resolves conflicts for allocations of resources of NASA s Deep Space Network (DSN) on the basis of ever-changing project requirements for DSN services. As used here, resources signifies, primarily, DSN antennas, ancillary equipment, and times during which they are available. Examples of project-required DSN services include arraying, segmentation, very-long-baseline interferometry, and multiple spacecraft per aperture. Requirements can include periodic reservations of specific or optional resources during specific time intervals or within ranges specified in terms of starting times and durations. This program is built on the Automated Scheduling and Planning Environment (ASPEN) software system (aspects of which have been described in previous NASA Tech Briefs articles), with customization to reflect requirements and constraints involved in allocation of DSN resources. Unlike prior DSN-resource- scheduling programs that make single passes through the requirements and require human intervention to resolve conflicts, this program makes repeated passes in a continuing search for all possible allocations, provides a best-effort solution at any time, and presents alternative solutions among which users can choose.
Abstract-Reasoning Software for Coordinating Multiple Agents
NASA Technical Reports Server (NTRS)
Clement, Bradley; Barrett, Anthony; Rabideau, Gregg; Knight, Russell
2003-01-01
A computer program for scheduling the activities of multiple agents that share limited resources has been incorporated into the Automated Scheduling and Planning Environment (ASPEN) software system, aspects of which have been reported in several previous NASA Tech Briefs articles. In the original intended application, the agents would be multiple spacecraft and/or robotic vehicles engaged in scientific exploration of distant planets. The program could also be used on Earth in such diverse settings as production lines and military maneuvers. This program includes a planning/scheduling subprogram of the iterative repair type that reasons about the activities of multiple agents at abstract levels in order to greatly improve the scheduling of their use of shared resources. The program summarizes the information about the constraints on, and resource requirements of, abstract activities on the basis of the constraints and requirements that pertain to their potential refinements (decomposition into less-abstract and ultimately to primitive activities). The advantage of reasoning about summary information is that time needed to find consistent schedules is exponentially smaller than the time that would be needed for reasoning about the same tasks at the primitive level.
Obesity and high blood pressure of 12-hour night shift female clean-room workers.
Chen, Jong-Dar; Lin, Yu-Cheng; Hsiao, Shu-Tin
2010-01-01
The 12 h shift schedule is widely used in clean rooms for electronic semiconductor production in Taiwan. This study investigated the associations of obesity and metabolic syndrome (MetS) components among women working in a semiconductor manufacturing factory in North Taiwan. Workers were divided into four groups according to their work schedules and duties (i.e., office workers, day workers, fixed 12 h day shift, and fixed 12 h night shiftworkers). The subjects comprised 1838 women who voluntarily attended a health examination between August 2006 and November 2006. Their mean (+/-SD) age was 33.6 (+/-7.1) yrs and their mean duration of work was 7.4 (+/-5.2) yrs. Each subject's health-related behaviors, body mass index, and MetS components were measured and analyzed using multivariate logistic regression. Obesity and MetS were defined according to World Health Organization criteria for Asian populations and the National Cholesterol Educational Program and Adult Treatment Panel III Guidelines, respectively. The results showed that women working in the clean room on fixed 12 h night shifts had significantly elevated odds ratios for obesity (OR, 2.7; 95% CI, 1.6-4.5), central obesity (OR, 2.9; 95% CI, 1.7-5.1), and high blood pressure (OR, 2.3; 95% CI, 1.2-4.4) compared to female office workers; these results persisted after adjusting for age, smoking, drinking, education, and duration of work. We did not find any significant differences in triglyceride and high-density lipoprotein cholesterol among women working different schedules. We conclude that working fixed 12 h night shifts was associated with an increased odds ratio for obesity, central obesity, and high blood pressure among clean-room women workers. Weight reduction and blood pressure control programs should be implemented in the workplace for women working fixed 12 h night shifts.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Russell, J.S.
Several factors in the development of the East Wilmington oil field by THUMS Long Beach Co. are described. These include: critical path scheduling, complex stratigraphy, reservoir engineering, drilling program, production methods, pressure maintenance, crude oil processing, automation, transportation facilities, service lines, and electrical facilities. The complexity and closely scheduled operational events interwoven in the THUMS project demands a method for the carefully planned sequence of jobs to be done, beginning with island construction up through routine production and to the LACT system. These demanding requirements necessitated the use of a critical path scheduling program. It was decided to use themore » program evaluation technique. This technique is used to assign responsibilities for individual assignments to time assignments, and to keep the overall program on schedule. The stratigraphy of East Wilmington complicates all engineering functions associated with recovery methods and reservoir evaluation. At least 5 major faults are anticipated.« less
The Composition of the Master Schedule
NASA Technical Reports Server (NTRS)
Thomas, Cynthia C.; Behrend, Dirk; MacMillan, Daniel S.
2010-01-01
Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.
Pitch Guidance Optimization for the Orion Abort Flight Tests
NASA Technical Reports Server (NTRS)
Stillwater, Ryan Allanque
2010-01-01
The National Aeronautics and Space Administration created the Constellation program to develop the next generation of manned space vehicles and launch vehicles. The Orion abort system is initiated in the event of an unsafe condition during launch. The system has a controller gains schedule that can be tuned to reduce the attitude errors between the simulated Orion abort trajectories and the guidance trajectory. A program was created that uses the method of steepest descent to tune the pitch gains schedule by an automated procedure. The gains schedule optimization was applied to three potential abort scenarios; each scenario tested using the optimized gains schedule resulted in reduced attitude errors when compared to the Orion production gains schedule.
49 CFR 237.101 - Scheduling of bridge inspections.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 4 2011-10-01 2011-10-01 false Scheduling of bridge inspections. 237.101 Section... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.101 Scheduling of bridge inspections. (a) Each bridge management program shall include a provision for scheduling an...
49 CFR 237.101 - Scheduling of bridge inspections.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Scheduling of bridge inspections. 237.101 Section... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.101 Scheduling of bridge inspections. (a) Each bridge management program shall include a provision for scheduling an...
Department of Defense Manpower Requirements Report FY 1995
1994-05-01
lm& INYI 94 III aIII$• ~ BY 9 SUBMI Sam 1 mm I Em 1 am m I am- ITv too a" mT amsITTm aSM . cm 10 ARMA 31 a 21 137 M1 st 1 33 157 179 to I to Ha3 201 am...determined by the DoD Retirement Board of Actuaries . This Board of Actuaries also determines an amortization schedule for the transfer of funds from the
NASA Technical Reports Server (NTRS)
Cochran, D. R.; Ishikawa, M. K.; Paulson, R. E.; Ramsey, H. R.
1975-01-01
A user guide for the Programming Language for Allocation and Network Scheduling (PLANS) is presented. Information is included for the construction of PLANS programs. The basic philosophy of PLANS is discussed, and access and update reference techniques are described along with the use of tree structures.
14 CFR 91.1029 - Flight scheduling and locating requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... program manager must establish and use an adequate system to schedule and release program aircraft. (b) Except as provided in paragraph (d) of this section, each program manager must have adequate procedures... manager with at least the information required to be included in a VFR flight plan; (2) Provide for timely...
ERIC Educational Resources Information Center
Hess, Richard T.; And Others
This content analysis schedule for the Albuquerque (New Mexico) Public School Bicultural-Bilingual Program presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and…
Scheduling for Locality in Shared-Memory Multiprocessors
1993-05-01
Submitted in Partial Fulfillment of the Requirements for the Degree ’)iIC Q(JALfryT INSPECTED 5 DOCTOR OF PHILOSOPHY I Accesion For Supervised by NTIS CRAM... architecture on parallel program performance, explain the implications of this trend on popular parallel programming models, and propose system software to 0...decomoosition and scheduling algorithms. I. SUIUECT TERMS IS. NUMBER OF PAGES shared-memory multiprocessors; architecture trends; loop 110 scheduling
1993-04-30
3 Maps Session Room s ....................................................... 4 Tram Schedule ...5 A m elia Island ......................................................... 6 Program Schedule ...Ballroom B 2 Ballroom A _ __ Seminar Rooms 4 and 5 4 -4- TRAM SCHEDULE 6 Tj A-eia is arc- 5a t a ’: 1cI.YARSHSIDE ca -,a -s, c -- s TRAM z:S-- - a-’s
Optimally Scheduling Basic Courses at the Defense Language Institute using Integer Programming
2005-09-01
DLI’s manual schedules at best can train 8%, 7% and 64%. 15. NUMBER OF PAGES 59 14. SUBJECT TERMS Operations Research, Linear Programming...class in 2006, 2007, and 2008, whereas DLI’s manual schedules at best can train 8%, 7% and 64%. vi THIS PAGE...ARABIC INSTRUTOR LEVELS .....................................25 FIGURE 2. OCS1 AND OCS2 CHINESE-MANDARIN INSTRUTOR LEVELS ............26 FIGURE 3
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-30
... schedule to execution charges for inbound ``Linkage Orders'' which only applied to the execution of linkage... in footnote (6) regarding the marketing fee; (iii) delete references to the old linkage in footnote...
49 CFR 381.510 - May the FMCSA end a pilot program before its scheduled completion date?
Code of Federal Regulations, 2010 CFR
2010-10-01
... achieving a level of safety that is at least equivalent to the level of safety that would be achieved by... 49 Transportation 5 2010-10-01 2010-10-01 false May the FMCSA end a pilot program before its... Pilot Programs § 381.510 May the FMCSA end a pilot program before its scheduled completion date? The...
NASA Technical Reports Server (NTRS)
Phillips, K.
1976-01-01
A mathematical model for job scheduling in a specified context is presented. The model uses both linear programming and combinatorial methods. While designed with a view toward optimization of scheduling of facility and plant operations at the Deep Space Communications Complex, the context is sufficiently general to be widely applicable. The general scheduling problem including options for scheduling objectives is discussed and fundamental parameters identified. Mathematical algorithms for partitioning problems germane to scheduling are presented.
Gauger, Paul G; Davis, Janice W; Orr, Peter J
2002-09-01
Administration of graduate medical education programs has become more difficult as compliance with ACGME work guidelines has assumed increased importance. These guidelines have caused many changes in the resident work environment, including the emergence of complicated cross-cover arrangements. Many participating residents (each with his or her own individual scheduling requirements) usually generate these schedules. Accordingly, schedules are often not submitted in a timely fashion and they may not be in compliance with the ACGME guidelines for maximum on-call assignments and mandatory days off. Our objective was the establishment of a Web-based system that guides residents in creating on-call schedules that follow ACGME guidelines while still allowing maximum flexibility -- thus allowing each resident to maintain an internal locus of control. A versatile and scalable system with password-protected user (resident) and administrator interfaces was created. An entire academic year is included, and past months and years are automatically archived. The residents log on within the first 15 days of the preceding month and choose their positions in a schedule template. They then make adjustments while receiving immediate summary feedback on compliance with ACGME guidelines. The schedule is electronically submitted to the educational administrator for final approval. If a cross-cover system is required, the program automatically generates an optimal schedule using both of the approved participating service schedules. The residents then have an additional five-day period to make adjustments in the cross-cover schedule while still receiving compliance feedback. The administrator again provides final approval electronically. The communication interface automatically pages or e-mails the residents when schedules are updated or approved. Since the information exists in a relational database, simple reporting tools are included to extract the information necessary to generate records for institutional GME management. Implementation of this program has been met with great enthusiasm from the institutional stakeholders. Specifically, residents have embraced the ability to directly control their schedules and have gained appreciation for the regulatory matrix in which they function. Institutional administrators have praised the improvement in compliance and the ease of documentation. We anticipate that the system will also meet with approval from reviewing regulatory bodies, as it generates and stores accurate information about the resident work environment. This program is robust and versatile enough to be modified for any GME training program in the country.
2013-12-10
This major final rule with comment period addresses changes to the physician fee schedule, clinical laboratory fee schedule, and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. This final rule with comment period also includes a discussion in the Supplementary Information regarding various programs. (See the Table of Contents for a listing of the specific issues addressed in the final rule with comment period.)
Solving cyclical nurse scheduling problem using preemptive goal programming
NASA Astrophysics Data System (ADS)
Sundari, V. E.; Mardiyati, S.
2017-07-01
Nurse scheduling system in a hospital is being modeled as a preemptive goal programming problem that is solved by using LINGO software with the objective function to minimize deviation variable at each goal. The scheduling is done cyclically, so every nurse is treated fairly since they have the same work shift portion with the other nurses. By paying attention to the hospital's rules regarding nursing work shift cyclically, it can be obtained that numbers of nurse needed in every ward are 18 nurses and the numbers of scheduling periods are 18 periods where every period consists of 21 days.
Evaluation of scheduling techniques for payload activity planning
NASA Technical Reports Server (NTRS)
Bullington, Stanley F.
1991-01-01
Two tasks related to payload activity planning and scheduling were performed. The first task involved making a comparison of space mission activity scheduling problems with production scheduling problems. The second task consisted of a statistical analysis of the output of runs of the Experiment Scheduling Program (ESP). Details of the work which was performed on these two tasks are presented.
A survey of planning and scheduling research at the NASA Ames Research Center
NASA Technical Reports Server (NTRS)
Zweben, Monte
1988-01-01
NASA Ames Research Center has a diverse program in planning and scheduling. This paper highlights some of our research projects as well as some of our applications. Topics addressed include machine learning techniques, action representations and constraint-based scheduling systems. The applications discussed are planetary rovers, Hubble Space Telescope scheduling, and Pioneer Venus orbit scheduling.
Relocation of the Cryo-Test Facility to NASA-MSFC
NASA Technical Reports Server (NTRS)
Sisco, Jimmy D.; McConnaughey, Paul K. (Technical Monitor)
2002-01-01
The Environmental Test Facility (ETF), located at NASA-Marshall Space Flight Center, Huntsville, Alabama, has provided thermal vacuum testing for several major programs since the 1960's. The ETF consists of over 13 thermal vacuum chambers sized and configured to handle the majority of test payloads. Testing is performed around the clock with multiple tests being conducted simultaneously. Chamber selection to achieve the best match with test articles and juggling program schedules, at times, can be a challenge. The ETF's Sunspot chamber has had tests scheduled and operated back-to-back for several years and provides the majority of schedule conflicts. Future test programs have been identified which surpass the current Sunspot availability. This paper describes a very low cost alternate to reduce schedule conflicts by utilizing government excess equipment
Integrated planning and scheduling for Earth science data processing
NASA Technical Reports Server (NTRS)
Boddy, Mark; White, Jim; Goldman, Robert; Short, Nick, Jr.
1995-01-01
Several current NASA programs such as the EOSDIS Core System (ECS) have data processing and data management requirements that call for an integrated planning and scheduling capability. In this paper, we describe the experience of applying advanced scheduling technology operationally, in terms of what was accomplished, lessons learned, and what remains to be done in order to achieve similar successes in ECS and other programs. We discuss the importance and benefits of advanced scheduling tools, and our progress toward realizing them, through examples and illustrations based on ECS requirements. The first part of the paper focuses on the Data Archive and Distribution (DADS) V0 Scheduler. We then discuss system integration issues ranging from communication with the scheduler to the monitoring of system events and re-scheduling in response to them. The challenge of adapting the scheduler to domain-specific features and scheduling policies is also considered. Extrapolation to the ECS domain raises issues of integrating scheduling with a product-generation planner (such as PlaSTiC), and implementing conditional planning in an operational system. We conclude by briefly noting ongoing technology development and deployment projects being undertaken by HTC and the ISTB.
7 CFR 275.20 - ME review schedules.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 4 2010-01-01 2010-01-01 false ME review schedules. 275.20 Section 275.20 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE... Program Performance § 275.20 ME review schedules. (a) Each State agency shall submit its review schedule...
7 CFR 275.20 - ME review schedules.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 4 2012-01-01 2012-01-01 false ME review schedules. 275.20 Section 275.20 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE... Program Performance § 275.20 ME review schedules. (a) Each State agency shall submit its review schedule...
7 CFR 275.20 - ME review schedules.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 4 2011-01-01 2011-01-01 false ME review schedules. 275.20 Section 275.20 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE... Program Performance § 275.20 ME review schedules. (a) Each State agency shall submit its review schedule...
7 CFR 275.20 - ME review schedules.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 4 2013-01-01 2013-01-01 false ME review schedules. 275.20 Section 275.20 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE... Program Performance § 275.20 ME review schedules. (a) Each State agency shall submit its review schedule...
Generically Used Expert Scheduling System (GUESS): User's Guide Version 1.0
NASA Technical Reports Server (NTRS)
Liebowitz, Jay; Krishnamurthy, Vijaya; Rodens, Ira
1996-01-01
This user's guide contains instructions explaining how to best operate the program GUESS, a generic expert scheduling system. GUESS incorporates several important features for a generic scheduler, including automatic scheduling routines to generate a 'first' schedule for the user, a user interface that includes Gantt charts and enables the human scheduler to manipulate schedules manually, diagnostic report generators, and a variety of scheduling techniques. The current version of GUESS runs on an IBM PC or compatible in the Windows 3.1 or Windows '95 environment.
National Airspace System : status of FAA's Standard Terminal Automation Replacement System
DOT National Transportation Integrated Search
2002-09-01
Comparing the currently projected cost and deployment schedule for : STARS with the original cost and schedule is difficult because the program : presently bears little resemblance to the program envisioned in 1996. At : that time, FAA contracted wit...
ERIC Educational Resources Information Center
Austin, Bruce A.
The 1976-79 schedules of the three major television networks were analyzed to determine what strategies were used to organize prime time schedules and what types of programs appeared during prime time viewing periods. Five essential programing strategies were identified: fraction of selection (cost versus reward), lowest common denominator (wide…
20 CFR 402.175 - Fees for providing information and related services for non-program purposes.
Code of Federal Regulations, 2011 CFR
2011-04-01
... related services for non-program purposes. (a) General. Section 1106(c) of the Social Security Act permits... (including costs of duplication) of providing information and related services under section 1106(c) of the... described in paragraph (c) of this section. (c) Fee schedule. Our fee schedule for non-program related...
An alternate property tax program requiring a forest management plan and scheduled harvesting
D.F. Dennis; P.E. Sendak
1991-01-01
Vermont's Use Value Appraisal property tax program, designed to address problems such as tax inequity and forced development caused by taxing agricultural and forest land based on speculative values, requires a forest management plan and scheduled harvests. A probit analysis of enrollment provides evidence of the program's success in attracting large parcels...
1994-12-01
Developing an Object-oriented S DRGuoxiangGu WL/MNAG 5- 24 Louisiana State University , Baton Rouge , LA Gain Scheduled Missile Autopilot...candidates being notified of their acceptance after scheduled deadlines. The total applicants and participants for 1994 are shown in this table. Table 2...planning and scheduling literature to identify developments that might apply to the design of a sensor manager. Applications examined primarily come
NASA Technical Reports Server (NTRS)
Bullington, Stanley F.
1992-01-01
The following list of requirements specifies the proposed revisions to the Experiment Scheduling Program (ESP2) which deal with schedule repair. These requirements are divided into those which are general in nature, those which relate to measurement and analysis functions of the software, those which relate specifically to conflict resolution, and those relating directly to the user interface. (This list is not a complete list of requirements for the user interface, but only a list of those schedule repair requirements which relate to the interface.) Some of the requirements relate only to uses of the software in real-time operations. Others are clearly for future versions of the software, beyond the upcoming revision. In either case, the fact will be clearly stated.
Development of a Dynamic Time Sharing Scheduled Environment Final Report CRADA No. TC-824-94E
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jette, M.; Caliga, D.
Massively parallel computers, such as the Cray T3D, have historically supported resource sharing solely with space sharing. In that method, multiple problems are solved by executing them on distinct processors. This project developed a dynamic time- and space-sharing scheduler to achieve greater interactivity and throughput than could be achieved with space-sharing alone. CRI and LLNL worked together on the design, testing, and review aspects of this project. There were separate software deliverables. CFU implemented a general purpose scheduling system as per the design specifications. LLNL ported the local gang scheduler software to the LLNL Cray T3D. In this approach, processorsmore » are allocated simultaneously to aU components of a parallel program (in a “gang”). Program execution is preempted as needed to provide for interactivity. Programs are also reIocated to different processors as needed to efficiently pack the computer’s torus of processors. In phase one, CRI developed an interface specification after discussions with LLNL for systemlevel software supporting a time- and space-sharing environment on the LLNL T3D. The two parties also discussed interface specifications for external control tools (such as scheduling policy tools, system administration tools) and applications programs. CRI assumed responsibility for the writing and implementation of all the necessary system software in this phase. In phase two, CRI implemented job-rolling on the Cray T3D, a mechanism for preempting a program, saving its state to disk, and later restoring its state to memory for continued execution. LLNL ported its gang scheduler to the LLNL T3D utilizing the CRI interface implemented in phases one and two. During phase three, the functionality and effectiveness of the LLNL gang scheduler was assessed to provide input to CRI time- and space-sharing, efforts. CRI will utilize this information in the development of general schedulers suitable for other sites and future architectures.« less
KSC-20170817-CDC01_0001-TDRS_M_Prelaunch_News_Conference-3166840
2017-08-17
In the Kennedy Space Center's Press Site auditorium, NASA and industry leaders speak to members of the media at a prelaunch news conference for NASA's Tracking and Data Relay Satellite, TDRS-M. Participants from left are: Kathryn Hambleton of NASA Communications, Tim Dunn, launch director at NASA Kennedy, Badri Younes, deputy associate administrator for Space Communications and Navigation at NASA Headquarters in Washington, Dave Littmann, project manager for TDRS-M at NASAâs Goddard Space Flight Center in Greenbelt, Maryland, James Wilson III, Boeing program manager for NASA/Civil Space Programs, Scott Messer, United Launch Alliance program manager for NASA missions, and Clay Flinn, launch weather officer with the 45th Space Wing at Cape Canaveral Air Force Station. TDRS-M is the latest spacecraft destined for the agency's constellation of communications satellites that allows nearly continuous contact with orbiting spacecraft ranging from the International Space Station and Hubble Space Telescope to the array of scientific observatories. Liftoff atop a United Launch Alliance Atlas V rocket is scheduled to take place from Space Launch Complex 41 at Cape Canaveral Air Force Station at 8:03 a.m. EDT Aug. 18.
32 CFR 199.18 - Uniform HMO Benefit.
Code of Federal Regulations, 2012 CFR
2012-07-01
... schedule, including frequency or age specifications for: (i) Laboratory and x-ray tests, including blood lead, rubella, cholesterol, fecal occult blood testing, and mammography; (ii) Pap smears; (iii) Eye exams; (iv) Immunizations; (v) Periodic health promotion and disease prevention exams; (vi) Blood...
32 CFR 199.18 - Uniform HMO Benefit.
Code of Federal Regulations, 2011 CFR
2011-07-01
... schedule, including frequency or age specifications for: (i) Laboratory and x-ray tests, including blood lead, rubella, cholesterol, fecal occult blood testing, and mammography; (ii) Pap smears; (iii) Eye exams; (iv) Immunizations; (v) Periodic health promotion and disease prevention exams; (vi) Blood...
32 CFR 199.18 - Uniform HMO Benefit.
Code of Federal Regulations, 2013 CFR
2013-07-01
... schedule, including frequency or age specifications for: (i) Laboratory and x-ray tests, including blood lead, rubella, cholesterol, fecal occult blood testing, and mammography; (ii) Pap smears; (iii) Eye exams; (iv) Immunizations; (v) Periodic health promotion and disease prevention exams; (vi) Blood...
77 FR 3233 - Marine Fisheries Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-23
... Fisheries Advisory Committee AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and... forth the schedule and proposed agenda of a forthcoming meeting of the Marine Fisheries Advisory...: January 18, 2012. Samuel D. Rauch III, Acting Assistant Administrator for Fisheries, National Marine...
The Healy clean coal project: An overview
DOE Office of Scientific and Technical Information (OSTI.GOV)
Olson, J.B.; McCrohan, D.V.
1997-12-31
The Healy Clean Coal Project, selected by the US Department of Energy under Round III of the Clean Coal Technology Program is currently in construction. The project is owned and financed by the Alaska Industrial Development and Export Authority (AIDEA), and is cofunded by the US Department of Energy. Construction is scheduled to be completed in August of 1997, with startup activity concluding in December of 1997. Demonstration, testing and reporting of the results will take place in 1998, followed by commercial operation of the facility. The emission levels of NOx, SO{sub 2} and particulates from this 50 megawatt plantmore » are expected to be significantly lower than current standards. The project status, its participants, a description of the technology to be demonstrated, and the operational and performance goals of this project are presented.« less
Software for Planning Scientific Activities on Mars
NASA Technical Reports Server (NTRS)
Ai-Chang, Mitchell; Bresina, John; Jonsson, Ari; Hsu, Jennifer; Kanefsky, Bob; Morris, Paul; Rajan, Kanna; Yglesias, Jeffrey; Charest, Len; Maldague, Pierre
2003-01-01
Mixed-Initiative Activity Plan Generator (MAPGEN) is a ground-based computer program for planning and scheduling the scientific activities of instrumented exploratory robotic vehicles, within the limitations of available resources onboard the vehicle. MAPGEN is a combination of two prior software systems: (1) an activity-planning program, APGEN, developed at NASA s Jet Propulsion Laboratory and (2) the Europa planner/scheduler from NASA Ames Research Center. MAPGEN performs all of the following functions: Automatic generation of plans and schedules for scientific and engineering activities; Testing of hypotheses (or what-if analyses of various scenarios); Editing of plans; Computation and analysis of resources; and Enforcement and maintenance of constraints, including resolution of temporal and resource conflicts among planned activities. MAPGEN can be used in either of two modes: one in which the planner/scheduler is turned off and only the basic APGEN functionality is utilized, or one in which both component programs are used to obtain the full planning, scheduling, and constraint-maintenance functionality.
Using the principles of circadian physiology enhances shift schedule design
DOE Office of Scientific and Technical Information (OSTI.GOV)
Connolly, J.J.; Moore-Ede, M.C.
1987-01-01
Nuclear power plants must operate 24 h, 7 days a week. For the most part, shift schedules currently in use at nuclear power plants have been designed to meet operational needs without considering the biological clocks of the human operators. The development of schedules that also take circadian principles into account is a positive step that can be taken to improve plant safety by optimizing operator alertness. These schedules reduce the probability of human errors especially during backshifts. In addition, training programs that teach round-the-clock workers how to deal with the problems of shiftwork can help to optimize performance andmore » alertness. These programs teach shiftworkers the underlying causes of the sleep problems associated with shiftwork and also provide coping strategies for improving sleep and dealing with the transition between shifts. When these training programs are coupled with an improved schedule, the problems associated with working round-the-clock can be significantly reduced.« less
32 CFR 286.28 - General provisions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... OF INFORMATION ACT PROGRAM DOD FREEDOM OF INFORMATION ACT PROGRAM REGULATION Fee Schedule § 286.28 General provisions. (a) Authorities. The Freedom of Information Act, as amended; the Paperwork Reduction... the Office of Management and Budget Uniform Freedom of Information Act Fee Schedule and Guidelines...
32 CFR 286.28 - General provisions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... OF INFORMATION ACT PROGRAM DOD FREEDOM OF INFORMATION ACT PROGRAM REGULATION Fee Schedule § 286.28 General provisions. (a) Authorities. The Freedom of Information Act, as amended; the Paperwork Reduction... the Office of Management and Budget Uniform Freedom of Information Act Fee Schedule and Guidelines...
32 CFR 286.28 - General provisions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... OF INFORMATION ACT PROGRAM DOD FREEDOM OF INFORMATION ACT PROGRAM REGULATION Fee Schedule § 286.28 General provisions. (a) Authorities. The Freedom of Information Act, as amended; the Paperwork Reduction... the Office of Management and Budget Uniform Freedom of Information Act Fee Schedule and Guidelines...
40 CFR 122.47 - Schedules of compliance.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Schedules of compliance. 122.47 Section 122.47 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS EPA ADMINISTERED PERMIT PROGRAMS: THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM Permit Conditions § 122.47...
40 CFR 122.47 - Schedules of compliance.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 22 2011-07-01 2011-07-01 false Schedules of compliance. 122.47 Section 122.47 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS EPA ADMINISTERED PERMIT PROGRAMS: THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM Permit Conditions § 122.47...
ERIC Educational Resources Information Center
Boland, William Casey
2018-01-01
To date, there has been little analysis of MSI Title III and V grant-funded programs across all MSI categories. For researchers, practitioners, and policymakers, it is imperative to explore the contributions of MSIs as manifested in Title III and V grant-funded programs. The purpose of this study is to analyze MSI Title III and V programs based on…
Lal, Himal; Poder, Airi; Campora, Laura; Geeraerts, Brecht; Oostvogels, Lidia; Vanden Abeele, Carline; Heineman, Thomas C
2018-01-02
In phase III trials, 2 doses of a herpes zoster (HZ) subunit vaccine (HZ/su; 50 µg varicella-zoster virus glycoprotein E [gE] and AS01 B Adjuvant System) administered 2-months apart in older adults (≥50 and ≥70 years) demonstrated >90% efficacy in preventing HZ and had a clinically acceptable safety profile. Here we report immunogenicity, reactogenicity and safety following administration of 2 HZ/su doses at intervals longer than 2 months. In this Phase III, open-label trial conducted in the US and Estonia, 354 adults ≥50 years were randomized 1:1:1 to receive 2 HZ/su doses 2, 6, or 12 months apart. gE-specific humoral immune responses were evaluated at pre-vaccination, 1 and 12 months post-dose 2. Co-primary objectives were to compare immune responses to HZ/su 1 month post-dose 2 when given 6-months or 12-months apart to those administered 2-months apart. For each participant, safety information was collected from dose 1 to 12 months post-dose 2. 346 participants completed the study and 343 were included in the according-to-protocol cohort for immunogenicity. One month post-dose 2, vaccine response rates were 96.5% (97.5% confidence interval [CI]: 90.4; 99.2) and 94.5% (97.5% CI: 87.6; 98.3) for the 0, 6- and 0, 12-month schedules, respectively, both schedules meeting the pre-defined criterion. Non-inferiority of anti-gE geometric mean concentrations was demonstrated for HZ/su administered on 0, 6-month compared to a 0, 2-month schedule; however, HZ/su administered on a 0, 12-month schedule did not meet the non-inferiority criterion. Injection site pain was the most commonly reported solicited adverse event (AE). 26 participants each reported at least 1 serious AE; none were assessed as related to vaccination. Immune responses to HZ/su administered at 0, 6-month were non-inferior to those elicited by a 0, 2-month schedule. HZ/su exhibited a clinically acceptable safety profile for all dosing intervals. Clinicaltrials.gov (NCT01751165). Copyright © 2017. Published by Elsevier Ltd.
Best Practices for Fatigue Risk Management in Non-Traditional Shiftwork
NASA Technical Reports Server (NTRS)
Flynn-Evans, Erin E.
2016-01-01
Fatigue risk management programs provide effective tools to mitigate fatigue among shift workers. Although such programs are effective for typical shiftwork scenarios, where individuals of equal skill level can be divided into shifts to cover 24 hour operations, traditional programs are not sufficient for managing sleep loss among individuals with unique skill sets, in occupations where non-traditional schedules are required. Such operations are prevalent at NASA and in other high stress occupations, including among airline pilots, military personnel, and expeditioners. These types of operations require fatigue risk management programs tailored to the specific requirements of the mission. Without appropriately tailored fatigue risk management, such operations can lead to an elevated risk of operational failure, disintegration of teamwork, and increased risk of accidents and incidents. In order to design schedules for such operations, schedule planners must evaluate the impact of a given operation on circadian misalignment, acute sleep loss, chronic sleep loss and sleep inertia. In addition, individual-level factors such as morningness-eveningness preference and sleep disorders should be considered. After the impact of each of these factors has been identified, scheduling teams can design schedules that meet operational requirements, while also minimizing fatigue.
Surprise Benefits of Arena Scheduling
ERIC Educational Resources Information Center
Surloff, Andrew
2008-01-01
One of the most challenging tasks a principal must accomplish every year is the construction of the master schedule. Free from the magnetic scheduling boards and wall charts of yesteryear, principals now have technological tools--such as programs that offer schools solutions for their scheduling needs--that can save time and enable them to work…
32 CFR 644.8 - Planning and scheduling real estate activities.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 32 National Defense 4 2012-07-01 2011-07-01 true Planning and scheduling real estate activities... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling real estate activities. (a) Normal scheduling. (1) The objective of a planned program is to provide for...
32 CFR 644.8 - Planning and scheduling real estate activities.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 32 National Defense 4 2013-07-01 2013-07-01 false Planning and scheduling real estate activities... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling real estate activities. (a) Normal scheduling. (1) The objective of a planned program is to provide for...
32 CFR 644.8 - Planning and scheduling real estate activities.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 4 2014-07-01 2013-07-01 true Planning and scheduling real estate activities... (CONTINUED) REAL PROPERTY REAL ESTATE HANDBOOK Project Planning Civil Works § 644.8 Planning and scheduling real estate activities. (a) Normal scheduling. (1) The objective of a planned program is to provide for...
Future applications of artificial intelligence to Mission Control Centers
NASA Technical Reports Server (NTRS)
Friedland, Peter
1991-01-01
Future applications of artificial intelligence to Mission Control Centers are presented in the form of the viewgraphs. The following subject areas are covered: basic objectives of the NASA-wide AI program; inhouse research program; constraint-based scheduling; learning and performance improvement for scheduling; GEMPLAN multi-agent planner; planning, scheduling, and control; Bayesian learning; efficient learning algorithms; ICARUS (an integrated architecture for learning); design knowledge acquisition and retention; computer-integrated documentation; and some speculation on future applications.
NASA Technical Reports Server (NTRS)
Thalman, Nancy E.; Sparn, Thomas P.
1990-01-01
SURE (Science User Resource Expert) is one of three components that compose the SURPASS (Science User Resource Planning and Scheduling System). This system is a planning and scheduling tool which supports distributed planning and scheduling, based on resource allocation and optimization. Currently SURE is being used within the SURPASS by the UARS (Upper Atmospheric Research Satellite) SOLSTICE instrument to build a daily science plan and activity schedule and in a prototyping effort with NASA GSFC to demonstrate distributed planning and scheduling for the SOLSTICE II instrument on the EOS platform. For the SOLSTICE application the SURE utilizes a rule-based system. Development of a rule-based program using Ada CLIPS as opposed to using conventional programming, allows for capture of the science planning and scheduling heuristics in rules and provides flexibility in inserting or removing rules as the scientific objectives and mission constraints change. The SURE system's role as a component in the SURPASS, the purpose of the SURE planning and scheduling tool, the SURE knowledge base, and the software architecture of the SURE component are described.
Scheduling IT Staff at a Bank: A Mathematical Programming Approach
Labidi, M.; Mrad, M.; Gharbi, A.; Louly, M. A.
2014-01-01
We address a real-world optimization problem: the scheduling of a Bank Information Technologies (IT) staff. This problem can be defined as the process of constructing optimized work schedules for staff. In a general sense, it requires the allocation of suitably qualified staff to specific shifts to meet the demands for services of an organization while observing workplace regulations and attempting to satisfy individual work preferences. A monthly shift schedule is prepared to determine the shift duties of each staff considering shift coverage requirements, seniority-based workload rules, and staff work preferences. Due to the large number of conflicting constraints, a multiobjective programming model has been proposed to automate the schedule generation process. The suggested mathematical model has been implemented using Lingo software. The results indicate that high quality solutions can be obtained within a few seconds compared to the manually prepared schedules. PMID:24772032
Scheduling IT staff at a bank: a mathematical programming approach.
Labidi, M; Mrad, M; Gharbi, A; Louly, M A
2014-01-01
We address a real-world optimization problem: the scheduling of a Bank Information Technologies (IT) staff. This problem can be defined as the process of constructing optimized work schedules for staff. In a general sense, it requires the allocation of suitably qualified staff to specific shifts to meet the demands for services of an organization while observing workplace regulations and attempting to satisfy individual work preferences. A monthly shift schedule is prepared to determine the shift duties of each staff considering shift coverage requirements, seniority-based workload rules, and staff work preferences. Due to the large number of conflicting constraints, a multiobjective programming model has been proposed to automate the schedule generation process. The suggested mathematical model has been implemented using Lingo software. The results indicate that high quality solutions can be obtained within a few seconds compared to the manually prepared schedules.
A Novel Collaboration to Reduce the Travel-Related Cost of Residency Interviewing.
Shappell, Eric; Fant, Abra; Schnapp, Benjamin; Craig, Jill P; Ahn, James; Babcock, Christine; Gisondi, Michael A
2017-04-01
Interviewing for residency is a complicated and often expensive endeavor. Literature has estimated interview costs of $4,000 to $15,000 per applicant, mostly attributable to travel and lodging. The authors sought to reduce these costs and improve the applicant interview experience by coordinating interview dates between two residency programs in Chicago, Illinois. Two emergency medicine residency programs scheduled contiguous interview dates for the 2015-2016 interview season. We used a survey to assess applicant experiences interviewing in Chicago and attitudes regarding coordinated scheduling. Data on utilization of coordinated dates were obtained from interview scheduling software. The target group for this intervention consisted of applicants from medical schools outside Illinois who completed interviews at both programs. Of the 158 applicants invited to both programs, 84 (53%) responded to the survey. Scheduling data were available for all applicants. The total estimated cost savings for target applicants coordinating interview dates was $13,950. The majority of target applicants reported that this intervention increased the ease of scheduling (84%), made them less likely to cancel the interview (82%), and saved them money (71%). Coordinated scheduling of interview dates was associated with significant estimated cost savings and was reviewed favorably by applicants across all measures of experience. Expanding use of this practice geographically and across specialties may further reduce the cost of interviewing for applicants.
NASA Technical Reports Server (NTRS)
Bishop, D. F.
1972-01-01
The problem of determining the cost impact attributable to perturbations in an aerospace R and D program schedule is discussed in terms of the diminishing availability of funds. The methodology from which a model is presented for updating R and D cost estimates as a function of perturbations in program time is presented.
Report of the Cost Assessment and Validation Task Force on the International Space Station
NASA Technical Reports Server (NTRS)
1998-01-01
The Cost Assessment and Validation (CAV) Task Force was established for independent review and assessment of cost, schedule and partnership performance on the International Space Station (ISS) Program. The CAV Task Force has made the following key findings: The International Space Station Program has made notable and reasonable progress over the past four years in defining and executing a very challenging and technically complex effort. The Program size, complexity, and ambitious schedule goals were beyond that which could be reasonably achieved within the $2.1 billion annual cap or $17.4 billion total cap. A number of critical risk elements are likely to have an adverse impact on the International Space Station cost and schedule. The schedule uncertainty associated with Russian implementation of joint Partnership agreements is the major threat to the ISS Program. The Fiscal Year (FY) 1999 budget submission to Congress is not adequate to execute the baseline ISS Program, cover normal program growth, and address the known critical risks. Additional annual funding of between $130 million and $250 million will be required. Completion of ISS assembly is likely to be delayed from one to three years beyond December 2003.
Cost Assessment and Validation Task Force on the International Space Station
NASA Technical Reports Server (NTRS)
1998-01-01
The Cost Assessment and Validation (CAV) Task Force was established for independent review and assessment of cost, schedule and partnership performance on the International Space Station (ISS) Program. The CAV Task Force has made the following key findings: The International Space Station Program has made notable and reasonable progress over the past four years in defining and executing a very challenging and technically complex effort; The Program, size, complexity, and ambitious schedule goals were beyond that which could be reasonably achieved within the $2.1 billion annual cap or $17.4 billion total cap; A number of critical risk elements are likely to have an adverse impact on the International Space Station cost and schedule; The schedule uncertainty associated with Russian implementation of joint Partnership agreements is the major threat to the ISS Program; The Fiscal Year (FY) 1999 budget submission to Congress is not adequate to execute the baseline ISS Program, cover normal program, growth, and address the known critical risks. Additional annual funding of between $130 million and $250 million will be required; and Completion of ISS assembly is likely to be delayed from, one to three years beyond December 2003.
NASA Technical Reports Server (NTRS)
Campbell, B. H.
1974-01-01
A methodology which was developed for balanced designing of spacecraft subsystems and interrelates cost, performance, safety, and schedule considerations was refined. The methodology consists of a two-step process: the first step is one of selecting all hardware designs which satisfy the given performance and safety requirements, the second step is one of estimating the cost and schedule required to design, build, and operate each spacecraft design. Using this methodology to develop a systems cost/performance model allows the user of such a model to establish specific designs and the related costs and schedule. The user is able to determine the sensitivity of design, costs, and schedules to changes in requirements. The resulting systems cost performance model is described and implemented as a digital computer program.
47 CFR 73.1510 - Experimental authorizations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 4 2010-10-01 2010-10-01 false Experimental authorizations. 73.1510 Section 73... conducted at any time the station is authorized to operate, but the minimum required schedule of programming... regularly scheduled programming concurrently with the experimental transmission if there is no significant...
47 CFR 73.1510 - Experimental authorizations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 4 2011-10-01 2011-10-01 false Experimental authorizations. 73.1510 Section 73... conducted at any time the station is authorized to operate, but the minimum required schedule of programming... regularly scheduled programming concurrently with the experimental transmission if there is no significant...
10 CFR 490.201 - Alternative fueled vehicle acquisition mandate schedule.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 3 2012-01-01 2012-01-01 false Alternative fueled vehicle acquisition mandate schedule. 490.201 Section 490.201 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Mandatory State Fleet Program § 490.201 Alternative fueled vehicle acquisition mandate...
10 CFR 490.201 - Alternative fueled vehicle acquisition mandate schedule.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 3 2010-01-01 2010-01-01 false Alternative fueled vehicle acquisition mandate schedule. 490.201 Section 490.201 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Mandatory State Fleet Program § 490.201 Alternative fueled vehicle acquisition mandate...
10 CFR 490.201 - Alternative fueled vehicle acquisition mandate schedule.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 3 2011-01-01 2011-01-01 false Alternative fueled vehicle acquisition mandate schedule. 490.201 Section 490.201 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Mandatory State Fleet Program § 490.201 Alternative fueled vehicle acquisition mandate...
10 CFR 490.201 - Alternative fueled vehicle acquisition mandate schedule.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 3 2013-01-01 2013-01-01 false Alternative fueled vehicle acquisition mandate schedule. 490.201 Section 490.201 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Mandatory State Fleet Program § 490.201 Alternative fueled vehicle acquisition mandate...
10 CFR 490.201 - Alternative fueled vehicle acquisition mandate schedule.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 3 2014-01-01 2014-01-01 false Alternative fueled vehicle acquisition mandate schedule. 490.201 Section 490.201 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Mandatory State Fleet Program § 490.201 Alternative fueled vehicle acquisition mandate...
Creation of the selection list for the Experiment Scheduling Program (ESP)
NASA Technical Reports Server (NTRS)
Deuermeyer, B. L.; Shannon, R. E.; Underbrink, A. J., Jr.
1986-01-01
The efforts to develop a procedure to construct selection groups to augment the Experiment Scheduling Program (ESP) are summarized. Included is a User's Guide and a sample scenario to guide in the use of the software system that implements the developed procedures.
Exploiting loop level parallelism in nonprocedural dataflow programs
NASA Technical Reports Server (NTRS)
Gokhale, Maya B.
1987-01-01
Discussed are how loop level parallelism is detected in a nonprocedural dataflow program, and how a procedural program with concurrent loops is scheduled. Also discussed is a program restructuring technique which may be applied to recursive equations so that concurrent loops may be generated for a seemingly iterative computation. A compiler which generates C code for the language described below has been implemented. The scheduling component of the compiler and the restructuring transformation are described.
76 FR 33181 - Regulatory Review Schedule
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-08
... DEPARTMENT OF THE INTERIOR National Indian Gaming Commission 25 CFR Chapter III Regulatory Review... conducting a comprehensive review of all its regulations and requesting public comment on the process for conducting the regulatory review. On April 4, 2011, after holding eight consultation meetings and reviewing...
76 FR 26967 - Regulatory Review Schedule
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-10
... DEPARTMENT OF THE INTERIOR National Indian Gaming Commission 25 CFR Chapter III Regulatory Review... review of its regulations and requesting public comment on the process for conducting the regulatory review. On April 4, 2011, after holding eight consultation meetings and reviewing all comments, NIGC...
21 CFR 1306.21 - Requirement of prescription.
Code of Federal Regulations, 2011 CFR
2011-04-01
... Substances Listed in Schedules III, IV, and V § 1306.21 Requirement of prescription. (a) A pharmacist may... individual practitioner and promptly reduced to writing by the pharmacist containing all information required... agent to the institutional practitioner-pharmacist, an electronic prescription that meets the...
21 CFR 1306.21 - Requirement of prescription.
Code of Federal Regulations, 2012 CFR
2012-04-01
... Substances Listed in Schedules III, IV, and V § 1306.21 Requirement of prescription. (a) A pharmacist may... individual practitioner and promptly reduced to writing by the pharmacist containing all information required... agent to the institutional practitioner-pharmacist, an electronic prescription that meets the...
21 CFR 1306.21 - Requirement of prescription.
Code of Federal Regulations, 2014 CFR
2014-04-01
... Substances Listed in Schedules III, IV, and V § 1306.21 Requirement of prescription. (a) A pharmacist may... individual practitioner and promptly reduced to writing by the pharmacist containing all information required... agent to the institutional practitioner-pharmacist, an electronic prescription that meets the...
21 CFR 1306.21 - Requirement of prescription.
Code of Federal Regulations, 2013 CFR
2013-04-01
... Substances Listed in Schedules III, IV, and V § 1306.21 Requirement of prescription. (a) A pharmacist may... individual practitioner and promptly reduced to writing by the pharmacist containing all information required... agent to the institutional practitioner-pharmacist, an electronic prescription that meets the...
21 CFR 1301.26 - Exemptions from import or export requirements for personal medical use.
Code of Federal Regulations, 2010 CFR
2010-04-01
... individual who has in his/her possession a controlled substance listed in schedules II, III, IV, or V, which... purposes of this section, a United States resident is a person whose residence (i.e., place of general...
Code of Federal Regulations, 2011 CFR
2011-01-01
... designated as not normally subject to change as a result of a Presidential transition; (iii) A position... Department of Energy employee appointed under § 213.3301 of this title to a Schedule C position is appointed...
Code of Federal Regulations, 2012 CFR
2012-01-01
... designated as not normally subject to change as a result of a Presidential transition; (iii) A position... Department of Energy employee appointed under § 213.3301 of this title to a Schedule C position is appointed...
Code of Federal Regulations, 2014 CFR
2014-01-01
... designated as not normally subject to change as a result of a Presidential transition; (iii) A position... Department of Energy employee appointed under § 213.3301 of this title to a Schedule C position is appointed...
Code of Federal Regulations, 2010 CFR
2010-01-01
... designated as not normally subject to change as a result of a Presidential transition; (iii) A position... Department of Energy employee appointed under § 213.3301 of this title to a Schedule C position is appointed...
Code of Federal Regulations, 2013 CFR
2013-01-01
... designated as not normally subject to change as a result of a Presidential transition; (iii) A position... Department of Energy employee appointed under § 213.3301 of this title to a Schedule C position is appointed...
76 FR 58790 - Notice of Interim Approval
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-22
.... FOR FURTHER INFORMATION CONTACT: Virgil G. Hobbs, III, Assistant Administrator, Finance & Marketing... September 30, 2013. The power marketing policy provides peaking capacity, along with 1500 hours of energy... schedules have been developed to cover the differing marketing arrangements in the Cumberland System under...
Grant Administration Manual for Title III Coordinators.
ERIC Educational Resources Information Center
Mathis, Emily Duncan; Ashmore, Frances W.
Guidelines for coordinators of programs under Title III of the Higher Education Act of 1965 are presented, based on a national survey of Title III program coordinators. The responsibilities of the coordinator and information on administering the Strengthening Developing Institutions Program (SDIP) grant are covered. The program can either be a…
75 FR 4227 - Phytosanitary Treatments; Location of and Process for Updating Treatment Schedules
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-26
...We are amending the phytosanitary treatment regulations in 7 CFR part 305 by removing the lists of approved treatments and treatment schedules from the regulations, while retaining the general requirements for performing treatments and certifying or approving treatment facilities. We are removing treatment schedules from other places where they are currently found in 7 CFR chapter III as well. Approved treatment schedules will instead be found in the Plant Protection and Quarantine Treatment Manual, which is available on the Internet. We are also establishing a new process to provide the public with notice and the opportunity to comment on changes to treatment schedules. Finally, we are harmonizing and combining the requirements for performing irradiation treatment for imported articles, articles moved interstate from Hawaii and U.S. territories, and articles moved interstate from an area quarantined for fruit flies. These changes will simplify and expedite our processes for adding, changing, and removing treatment schedules while continuing to provide for public participation in the process. These changes will also simplify our presentation of treatments to the public by consolidating all treatments into one document and eliminating redundant text from the regulations.
A computer method for schedule processing and quick-time updating.
NASA Technical Reports Server (NTRS)
Mccoy, W. H.
1972-01-01
A schedule analysis program is presented which can be used to process any schedule with continuous flow and with no loops. Although generally thought of as a management tool, it has applicability to such extremes as music composition and computer program efficiency analysis. Other possibilities for its use include the determination of electrical power usage during some operation such as spacecraft checkout, and the determination of impact envelopes for the purpose of scheduling payloads in launch processing. At the core of the described computer method is an algorithm which computes the position of each activity bar on the output waterfall chart. The algorithm is basically a maximal-path computation which gives to each node in the schedule network the maximal path from the initial node to the given node.
The Associate Principal Astronomer for AI Management of Automatic Telescopes
NASA Technical Reports Server (NTRS)
Henry, Gregory W.
1998-01-01
This research program in scheduling and management of automatic telescopes had the following objectives: 1. To field test the 1993 Automatic Telescope Instruction Set (ATIS93) programming language, which was specifically developed to allow real-time control of an automatic telescope via an artificial intelligence scheduler running on a remote computer. 2. To develop and test the procedures for two-way communication between a telescope controller and remote scheduler via the Internet. 3. To test various concepts in Al scheduling being developed at NASA Ames Research Center on an automatic telescope operated by Tennessee State University at the Fairborn Observatory site in southern Arizona. and 4. To develop a prototype software package, dubbed the Associate Principal Astronomer, for the efficient scheduling and management of automatic telescopes.
Balloon Program Wraps up in Antarctica, Heading to New Zealand
2015-02-02
Caption: A NASA Super Pressure Balloon with the COSI payload is ready for launch from McMurdo, Antarctica. Credit: NASA More info: NASA’s globetrotting Balloon Program Office is wrapping up its 2014-2015 Antarctic campaign while prepping for an around-the-world flight launching out of Wanaka, New Zealand, in March. After 16 days, 12 hours, and 56 minutes of flight, operators successfully conducted a planned flight termination of the Suborbital Polarimeter for Inflation Dust and the Epoch of Reionization (SPIDER) mission Saturday, Jan. 18, the final mission of the campaign. Other flights in the 2014-2015 Antarctic campaign included the Antarctic Impulsive Transient Antenna (ANITA-III) mission as well as the Compton Spectrometer and Imager (COSI) payload flown on the developmental Super Pressure Balloon (SPB). ANITA-III successfully wrapped up Jan. 9 after 22 days, 9 hours, and 14 minutes of flight. Flight controllers terminated the COSI flight 43 hours into the mission after detecting a small gas leak in the balloon. Crews are now working to recover all three instruments from different locations across the continent. The 6,480-pound SPIDER payload is stationary at a position about 290 miles from the United Kingdom’s Sky Blu Logistics Facility in Antarctica. The 4,601 pound ANITA-III payload, located about 100 miles from Australia’s Davis Station, and the 2,866 pound COSI payload, located about 340 miles from the United States McMurdo Station both had numerous key components recovered in the past few days. Beginning in late January, the Balloon Program Office will deploy a team to Wanaka, New Zealand, to begin preparations for an SPB flight, scheduled to launch in March. The Program Office seeks to fly the SPB more than 100 days, which would shatter the current flight duration record of 55 days, 1 hour, and 34 minutes for a large scientific balloon. “We’re looking forward to the New Zealand campaign and hopefully a history-making flight with the Super Pressure Balloon,” said Debbie Fairbrother, NASA’s Balloon Program Office Chief. Most scientific balloons see altitude variances based on temperature changes in the atmosphere at night and during the day. The SPB is capable of missions on the order of 100 days or more at constant float altitudes due to the pressurization of the balloon. “Stable, long-duration flights at near-space altitudes above more than 99 percent of the atmosphere are highly desirable in the science community, and we’re ready to deliver,” said Fairbrother. In addition to the SPB flight in March, the Balloon Program Office has 10 more balloon missions planned through September 2015 to include scheduled test flights of the Low-Density Supersonic Decelerator, which is testing new technologies for landing larger, heavier payloads on Mars. NASA’s Wallops Flight Facility manages the agency’s Scientific Balloon Program with 10 to 15 flights each year from launch sites worldwide. The balloons are massive in volume; the average-sized balloon could hold the volume of nearly 200 blimps. Previous work on balloons have contributed to confirming the Big Bang Theory. For more information on NASA’s Scientific Balloon Program, see: sites.wff.nasa.gov/code820/index.html NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram
5 CFR 213.3402 - Entire executive civil service; Pathways Programs.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 5 Administrative Personnel 1 2013-01-01 2013-01-01 false Entire executive civil service; Pathways Programs. 213.3402 Section 213.3402 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS EXCEPTED SERVICE Excepted Schedules Schedule D § 213.3402 Entire executive civil service; Pathways...
5 CFR 213.3402 - Entire executive civil service; Pathways Programs.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Entire executive civil service; Pathways Programs. 213.3402 Section 213.3402 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS EXCEPTED SERVICE Excepted Schedules Schedule D § 213.3402 Entire executive civil service; Pathways...
Engineering Technician Standards.
ERIC Educational Resources Information Center
National Aeronautics and Space Administration, Hampton, VA. Langley Research Center.
The booklet describes the program offerings, requirements, training, and pay schedules of the Langley Research Center Technician Training Program. Training schedules and the duties expected upon completion of each of the training areas are specified, along with on-the-job and academic requirements. The areas of training are: engineering draftsman,…
TRU Waste Management Program cost/schedule optimization analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.
1985-10-01
The cost/schedule optimization task is a necessary function to insure that program goals and plans are optimized from a cost and schedule aspect. Results of this study will offer DOE information with which it can establish, within institutional constraints, the most efficient program for the long-term management and disposal of contact handled transuranic waste (CH-TRU). To this end, a comprehensive review of program cost/schedule tradeoffs has been made, to identify any major cost saving opportunities that may be realized by modification of current program plans. It was decided that all promising scenarios would be explored, and institutional limitations to implementationmore » would be described. Since a virtually limitless number of possible scenarios can be envisioned, it was necessary to distill these possibilities into a manageable number of alternatives. The resultant scenarios were described in the cost/schedule strategy and work plan document. Each scenario was compared with the base case: waste processing at the originating site; transport of CH-TRU wastes in TRUPACT; shipment of drums in 6-Packs; 25 year stored waste workoff; WIPP operational 10/88, with all sites shipping to WIPP beginning 10/88; and no processing at WIPP. Major savings were identified in two alternate scenarios: centralize waste processing at INEL and eliminate rail shipment of TRUPACT. No attempt was made to calculate savings due to combination of scenarios. 1 ref., 5 figs., 1 tab. (MHB)« less
Code of Federal Regulations, 2011 CFR
2011-07-01
... machine cards not available from Federal Supply Schedule contracts. 101-26.509-2 Section 101-26.509-2... Programs § 101-26.509-2 Requisitioning tabulating machine cards not available from Federal Supply Schedule contracts. (a) Requisitions for tabulating machine cards covered by Federal Supply Schedule contracts which...
49 CFR Appendix A to Part 242 - Schedule of Civil Penalties
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 4 2012-10-01 2012-10-01 false Schedule of Civil Penalties A Appendix A to Part... Appendix A to Part 242—Schedule of Civil Penalties A penalty may be assessed against an individual only for...—Schedule of Civil Penalties 1 Section Violation Willful violation Subpart B—Program and Eligibility...
Enhanced Software for Scheduling Space-Shuttle Processing
NASA Technical Reports Server (NTRS)
Barretta, Joseph A.; Johnson, Earl P.; Bierman, Rocky R.; Blanco, Juan; Boaz, Kathleen; Stotz, Lisa A.; Clark, Michael; Lebovitz, George; Lotti, Kenneth J.; Moody, James M.;
2004-01-01
The Ground Processing Scheduling System (GPSS) computer program is used to develop streamlined schedules for the inspection, repair, and refurbishment of space shuttles at Kennedy Space Center. A scheduling computer program is needed because space-shuttle processing is complex and it is frequently necessary to modify schedules to accommodate unanticipated events, unavailability of specialized personnel, unexpected delays, and the need to repair newly discovered defects. GPSS implements constraint-based scheduling algorithms and provides an interactive scheduling software environment. In response to inputs, GPSS can respond with schedules that are optimized in the sense that they contain minimal violations of constraints while supporting the most effective and efficient utilization of space-shuttle ground processing resources. The present version of GPSS is a product of re-engineering of a prototype version. While the prototype version proved to be valuable and versatile as a scheduling software tool during the first five years, it was characterized by design and algorithmic deficiencies that affected schedule revisions, query capability, task movement, report capability, and overall interface complexity. In addition, the lack of documentation gave rise to difficulties in maintenance and limited both enhanceability and portability. The goal of the GPSS re-engineering project was to upgrade the prototype into a flexible system that supports multiple- flow, multiple-site scheduling and that retains the strengths of the prototype while incorporating improvements in maintainability, enhanceability, and portability.
Simplifying Facility and Event Scheduling: Saving Time and Money.
ERIC Educational Resources Information Center
Raasch, Kevin
2003-01-01
Describes a product called the Event Management System (EMS), a computer software program to manage facility and event scheduling. Provides example of the school district and university uses of EMS. Describes steps in selecting a scheduling-management system. (PKP)
40 CFR 52.1524 - Compliance schedules.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 4 2014-07-01 2014-07-01 false Compliance schedules. 52.1524 Section 52.1524 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Hampshire § 52.1524 Compliance schedules...
40 CFR 52.1524 - Compliance schedules.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 4 2012-07-01 2012-07-01 false Compliance schedules. 52.1524 Section 52.1524 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Hampshire § 52.1524 Compliance schedules...
40 CFR 52.1524 - Compliance schedules.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Compliance schedules. 52.1524 Section 52.1524 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Hampshire § 52.1524 Compliance schedules...
40 CFR 52.1524 - Compliance schedules.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 4 2013-07-01 2013-07-01 false Compliance schedules. 52.1524 Section 52.1524 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) New Hampshire § 52.1524 Compliance schedules...
Training and certification of work schedule managers may improve shift scheduling practices
DOT National Transportation Integrated Search
2011-02-01
The Federal Railroad Administration (FRA) Human Factors Research and Development (R&D) Program : sponsored the implementation of a strategic job analysis to investigate the job of work schedule managers : (WSMs) across a diverse range of industries t...
29 CFR 1908.5 - Requests and scheduling for onsite consultation.
Code of Federal Regulations, 2013 CFR
2013-07-01
... following: (i) Paid newspaper advertisements; (ii) Newspaper, magazine, and trade publication articles; (iii... business and labor organizations and leaders, and public officials; (vi) Solicitation of publicizing by... shall be assigned to requests from businesses with the most hazardous operations, with primary attention...
29 CFR 1908.5 - Requests and scheduling for onsite consultation.
Code of Federal Regulations, 2012 CFR
2012-07-01
... following: (i) Paid newspaper advertisements; (ii) Newspaper, magazine, and trade publication articles; (iii... business and labor organizations and leaders, and public officials; (vi) Solicitation of publicizing by... shall be assigned to requests from businesses with the most hazardous operations, with primary attention...
29 CFR 1908.5 - Requests and scheduling for onsite consultation.
Code of Federal Regulations, 2011 CFR
2011-07-01
... following: (i) Paid newspaper advertisements; (ii) Newspaper, magazine, and trade publication articles; (iii... business and labor organizations and leaders, and public officials; (vi) Solicitation of publicizing by... shall be assigned to requests from businesses with the most hazardous operations, with primary attention...
29 CFR 1908.5 - Requests and scheduling for onsite consultation.
Code of Federal Regulations, 2014 CFR
2014-07-01
... following: (i) Paid newspaper advertisements; (ii) Newspaper, magazine, and trade publication articles; (iii... business and labor organizations and leaders, and public officials; (vi) Solicitation of publicizing by... shall be assigned to requests from businesses with the most hazardous operations, with primary attention...
Code of Federal Regulations, 2010 CFR
2010-10-01
... considered include— (i) Satisfying customer requirements; (ii) Schedule; (iii) Cost effectiveness (taking... threshold through a non-DoD agency in any fiscal year only if the head of the non-DoD agency has certified... order exceeds the simplified acquisition threshold. These procedures shall include— (1) Evaluating...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-13
... regulations in 7 CFR chapter III are intended, among other things, to prevent the introduction or.... 305.3(b)(1). They are: \\1\\ The Treatment Manual is available on the Internet at http://www.aphis.usda...
76 FR 70366 - Ammonium Nitrate Security Program
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-14
... Ammonium Nitrate Security Program, the DHS will regulate the sale and transfer of ammonium nitrate pursuant... raised in this notice. Date, Time, and Location: An additional public meeting is scheduled to be held at... changes to the current schedule or additional public meeting dates, times, and locations in a subsequent...
Ballard, C; Patel, A; Oyebode, F; Wilcock, G
1996-05-01
One hundred and twenty-four patients with DSM-III-R dementia were assessed with a standardized battery which included the Geriatric Mental State Schedule, the History and Aetiology Schedule, the Secondary Dementia Schedule and the CAMCOG. Patients with Alzheimer's disease, vascular dementia and senile dementia of Lewy body type (SDLT) all had a similar degree of cognitive impairment at the time of the baseline interview. Patients with Alzheimer's disease and vascular dementia each experienced a mean decline of 27 points in patients with SDLT. Patients with SDLT had a significantly greater decline of verbal fluency than both the other groups. Women were significantly more impaired than men at the time of the baseline assessment but experienced a similar decline during the year of follow-up.
Wave scheduling - Decentralized scheduling of task forces in multicomputers
NASA Technical Reports Server (NTRS)
Van Tilborg, A. M.; Wittie, L. D.
1984-01-01
Decentralized operating systems that control large multicomputers need techniques to schedule competing parallel programs called task forces. Wave scheduling is a probabilistic technique that uses a hierarchical distributed virtual machine to schedule task forces by recursively subdividing and issuing wavefront-like commands to processing elements capable of executing individual tasks. Wave scheduling is highly resistant to processing element failures because it uses many distributed schedulers that dynamically assign scheduling responsibilities among themselves. The scheduling technique is trivially extensible as more processing elements join the host multicomputer. A simple model of scheduling cost is used by every scheduler node to distribute scheduling activity and minimize wasted processing capacity by using perceived workload to vary decentralized scheduling rules. At low to moderate levels of network activity, wave scheduling is only slightly less efficient than a central scheduler in its ability to direct processing elements to accomplish useful work.
10 CFR 490.302 - Vehicle acquisition mandate schedule.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 3 2012-01-01 2012-01-01 false Vehicle acquisition mandate schedule. 490.302 Section 490.302 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fuel Provider Vehicle Acquisition Mandate § 490.302 Vehicle acquisition mandate schedule. (a...
10 CFR 490.302 - Vehicle acquisition mandate schedule.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 3 2010-01-01 2010-01-01 false Vehicle acquisition mandate schedule. 490.302 Section 490.302 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fuel Provider Vehicle Acquisition Mandate § 490.302 Vehicle acquisition mandate schedule. (a...
10 CFR 490.302 - Vehicle acquisition mandate schedule.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 3 2011-01-01 2011-01-01 false Vehicle acquisition mandate schedule. 490.302 Section 490.302 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fuel Provider Vehicle Acquisition Mandate § 490.302 Vehicle acquisition mandate schedule. (a...
10 CFR 490.302 - Vehicle acquisition mandate schedule.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 3 2013-01-01 2013-01-01 false Vehicle acquisition mandate schedule. 490.302 Section 490.302 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fuel Provider Vehicle Acquisition Mandate § 490.302 Vehicle acquisition mandate schedule. (a...
10 CFR 490.302 - Vehicle acquisition mandate schedule.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 3 2014-01-01 2014-01-01 false Vehicle acquisition mandate schedule. 490.302 Section 490.302 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fuel Provider Vehicle Acquisition Mandate § 490.302 Vehicle acquisition mandate schedule. (a...
28 CFR 548.13 - Schedules and facilities.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Schedules and facilities. 548.13 Section 548.13 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE INSTITUTIONAL MANAGEMENT RELIGIOUS PROGRAMS Religious Beliefs and Practices of Committed Offenders § 548.13 Schedules and facilities...
28 CFR 548.13 - Schedules and facilities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Schedules and facilities. 548.13 Section 548.13 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE INSTITUTIONAL MANAGEMENT RELIGIOUS PROGRAMS Religious Beliefs and Practices of Committed Offenders § 548.13 Schedules and facilities...
28 CFR 548.13 - Schedules and facilities.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Schedules and facilities. 548.13 Section 548.13 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE INSTITUTIONAL MANAGEMENT RELIGIOUS PROGRAMS Religious Beliefs and Practices of Committed Offenders § 548.13 Schedules and facilities...
28 CFR 548.13 - Schedules and facilities.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Schedules and facilities. 548.13 Section 548.13 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE INSTITUTIONAL MANAGEMENT RELIGIOUS PROGRAMS Religious Beliefs and Practices of Committed Offenders § 548.13 Schedules and facilities...
28 CFR 548.13 - Schedules and facilities.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Schedules and facilities. 548.13 Section 548.13 Judicial Administration BUREAU OF PRISONS, DEPARTMENT OF JUSTICE INSTITUTIONAL MANAGEMENT RELIGIOUS PROGRAMS Religious Beliefs and Practices of Committed Offenders § 548.13 Schedules and facilities...
40 CFR 52.626 - Compliance schedules.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Compliance schedules. 52.626 Section 52.626 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.626 Compliance schedules. (a) [Reserved] (b...
40 CFR 63.1102 - Compliance schedule.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 10 2010-07-01 2010-07-01 false Compliance schedule. 63.1102 Section 63.1102 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... Technology Standards § 63.1102 Compliance schedule. (a) General requirements. Affected sources, as defined in...
Schedulers with load-store queue awareness
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, Tong; Eichenberger, Alexandre E.; Jacob, Arpith C.
2017-02-07
In one embodiment, a computer-implemented method includes tracking a size of a load-store queue (LSQ) during compile time of a program. The size of the LSQ is time-varying and indicates how many memory access instructions of the program are on the LSQ. The method further includes scheduling, by a computer processor, a plurality of memory access instructions of the program based on the size of the LSQ.
Schedulers with load-store queue awareness
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, Tong; Eichenberger, Alexandre E.; Jacob, Arpith C.
2017-01-24
In one embodiment, a computer-implemented method includes tracking a size of a load-store queue (LSQ) during compile time of a program. The size of the LSQ is time-varying and indicates how many memory access instructions of the program are on the LSQ. The method further includes scheduling, by a computer processor, a plurality of memory access instructions of the program based on the size of the LSQ.
Phase C/D program development plan. Volume 1: Program plan
NASA Technical Reports Server (NTRS)
1971-01-01
The Phase C/D definition of the Modular Space Station has been developed. The modular approach selected during the option period was evaluated, requirements were defined, and program definition and preliminary design were accomplished. The Space Station Project is covered in depth, the research applications module is limited to a project-level definition, and the shuttle operations are included for interface requirements identification, scheduling, and costing. Discussed in detail are: (1) baseline program and project descriptions; (2) phase project planning; (3) modular space station program schedule; (4) program management plan; (5) operations; (6) facilities; (7) logistics; and (8) manpower.
Interaction Between Strategic and Local Traffic Flow Controls
NASA Technical Reports Server (NTRS)
Grabbe, Son; Sridhar, Banavar; Mukherjee, Avijit; Morando, Alexander
2010-01-01
The loosely coordinated sets of traffic flow management initiatives that are operationally implemented at the national- and local-levels have the potential to under, over, and inconsistently control flights. This study is designed to explore these interactions through fast-time simulations with an emphasis on identifying inequitable situations in which flights receive multiple uncoordinated delays. Two operationally derived scenarios were considered in which flights arriving into the Dallas/Fort Worth International Airport were first controlled at the national-level, either with a Ground Delay Program or a playbook reroute. These flights were subsequently controlled at the local level. The Traffic Management Advisor assigned them arrival scheduling delays. For the Ground Delay Program scenarios, between 51% and 53% of all arrivals experience both pre-departure delays from the Ground Delay Program and arrival scheduling delays from the Traffic Management Advisor. Of the subset of flights that received multiple delays, between 5.7% and 6.4% of the internal departures were first assigned a pre-departure delay by the Ground Delay Program, followed by a second pre-departure delay as a result of the arrival scheduling. For the playbook reroute scenario, Dallas/Fort Worth International Airport arrivals were first assigned pre-departure reroutes based on the MW_2_DALLAS playbook plan, and were subsequently assigned arrival scheduling delays by the Traffic Management Advisor. Since the airport was operating well below capacity when the playbook reroute was in effect, only 7% of the arrivals were observed to receive both rerouting and arrival scheduling delays. Findings from these initial experiments confirm field observations that Ground Delay Programs operated in conjunction with arrival scheduling can result in inequitable situations in which flights receive multiple uncoordinated delays.
Integration of Openstack cloud resources in BES III computing cluster
NASA Astrophysics Data System (ADS)
Li, Haibo; Cheng, Yaodong; Huang, Qiulan; Cheng, Zhenjing; Shi, Jingyan
2017-10-01
Cloud computing provides a new technical means for data processing of high energy physics experiment. However, the resource of each queue is fixed and the usage of the resource is static in traditional job management system. In order to make it simple and transparent for physicist to use, we developed a virtual cluster system (vpmanager) to integrate IHEPCloud and different batch systems such as Torque and HTCondor. Vpmanager provides dynamic virtual machines scheduling according to the job queue. The BES III use case results show that resource efficiency is greatly improved.
76 FR 54408 - Regulatory Review Schedule
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-01
... DEPARTMENT OF THE INTERIOR National Indian Gaming Commission 25 CFR Chapter III Regulatory Review...-7003; e-mail: reg.review@nigc.gov . SUPPLEMENTARY INFORMATION: On November 18, 2010, the National... that it was conducting a review of its regulations promulgated to implement 25 U.S.C. 2701-2721 of the...
40 CFR 52.2223 - Compliance schedules.
Code of Federal Regulations, 2010 CFR
2010-07-01
..., 1974: Submit to the Administrator a projection of the amount of fuel, by types, that will be... projected above. (iii) April 30, 1974: Submit a statement as to whether boiler modifications will be required. If modifications will be required, submit plans for such modifications. (iv) May 31, 1974: Let...
7 CFR 1951.223 - Reamortization.
Code of Federal Regulations, 2010 CFR
2010-01-01
... delinquent amount. Accrued interest will be at the rate currently reflected in Finance Office records. (1... government's interest will remain adequately protected if the security position will be affected. (3) Notes...; and (E) The interest rate. (iii) A payment will be due on the next scheduled due date. Deferment of...
42 CFR 410.43 - Partial hospitalization services: Conditions and exclusions.
Code of Federal Regulations, 2014 CFR
2014-10-01
... appropriate supervision of a qualified occupational therapist by an occupational therapy assistant as specified in part 484 of this chapter. (iii) Services of social workers, trained psychiatric nurses, and... this chapter for payment on a fee schedule basis. (2) Physician assistant services, as defined in...
42 CFR 410.43 - Partial hospitalization services: Conditions and exclusions.
Code of Federal Regulations, 2012 CFR
2012-10-01
... appropriate supervision of a qualified occupational therapist by an occupational therapy assistant as specified in part 484 of this chapter. (iii) Services of social workers, trained psychiatric nurses, and... this chapter for payment on a fee schedule basis. (2) Physician assistant services, as defined in...
42 CFR 410.43 - Partial hospitalization services: Conditions and exclusions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... appropriate supervision of a qualified occupational therapist by an occupational therapy assistant as specified in part 484 of this chapter. (iii) Services of social workers, trained psychiatric nurses, and... this chapter for payment on a fee schedule basis. (2) Physician assistant services, as defined in...
42 CFR 410.43 - Partial hospitalization services: Conditions and exclusions.
Code of Federal Regulations, 2013 CFR
2013-10-01
... appropriate supervision of a qualified occupational therapist by an occupational therapy assistant as specified in part 484 of this chapter. (iii) Services of social workers, trained psychiatric nurses, and... this chapter for payment on a fee schedule basis. (2) Physician assistant services, as defined in...
Code of Federal Regulations, 2011 CFR
2011-10-01
... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Cargo Insurance Iii-Facultative War Risk Cargo Insurance § 308.540 Premiums. (a) Rates. Rate Schedules for war risk facultative... without notice. If no rate is published for a voyage on which war risk facultative cargo insurance is...
Code of Federal Regulations, 2013 CFR
2013-10-01
... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Cargo Insurance Iii-Facultative War Risk Cargo Insurance § 308.540 Premiums. (a) Rates. Rate Schedules for war risk facultative... without notice. If no rate is published for a voyage on which war risk facultative cargo insurance is...
Code of Federal Regulations, 2010 CFR
2010-10-01
... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Cargo Insurance Iii-Facultative War Risk Cargo Insurance § 308.540 Premiums. (a) Rates. Rate Schedules for war risk facultative... without notice. If no rate is published for a voyage on which war risk facultative cargo insurance is...
Code of Federal Regulations, 2012 CFR
2012-10-01
... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION EMERGENCY OPERATIONS WAR RISK INSURANCE War Risk Cargo Insurance Iii-Facultative War Risk Cargo Insurance § 308.540 Premiums. (a) Rates. Rate Schedules for war risk facultative... without notice. If no rate is published for a voyage on which war risk facultative cargo insurance is...
78 FR 4211 - Setting and Adjusting Patent Fees
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-18
... United States economy depends on high quality and timely patents to protect new ideas and investments for... described in Part III of this final rule, namely, fostering innovation, facilitating effective... recovering revenue from back-end fees, the final fee schedule continues to foster innovation and ease access...
SAGE-III Ready for Ozone Checkup
2017-02-15
A third-generation investigation into the state of the ozone layer of Earth’s atmosphere is scheduled for launch to the International Space Station on the SpaceX-10 cargo ship. Marilee Roell of NASA’s Langley Research Center explains how the third iteration of the Stratospheric Aerosol and Gas Experiment will measure ozone, aerosols and other components of the atmosphere for scientists who hope to see an improvement in the atmosphere’s ability to protect the planet—and everyone and everything on it—from harmful ultraviolet radiation. For more on ISS science, visit us online: https://www.nasa.gov/mission_pages/station/research/index.html www.twitter.com/iss_research HD download link: https://archive.org/details/TheSpaceProgram _______________________________________ FOLLOW THE SPACE STATION! Twitter: https://twitter.com/Space_Station Facebook: https://www.facebook.com/ISS Instagram: https://instagram.com/iss/ YouTube: https://youtu.be/HQdMZ5OAU3U
Propulsion Control and Health Management (PCHM) Technology for Flight Test on the C-17 T-1 Aircraft
NASA Technical Reports Server (NTRS)
Simon, Donald L.; Garg, Sanjay; Venti, Michael
2004-01-01
The C-I 7 T-l Globemaster III is an Air Force flight research vehicle located at Edwards Air Force Base. NASA Dryden and the C-17 System Program Office have entered into a Memorandum of Agreement to permit NASA the use of the C-I 7 T-I to conduct flight research on a mutually coordinated schedule. The C-17 Propulsion Control and Health Management (PCHM) Working Group was formed in order to foster discussion and coordinate planning amongst the various government agencies conducting PCHM research with a potential need for flight testing, and to communicate to the PCHM community the capabilities of the C-17 T-l aircraft to support such flight testing. This paper documents the output of this Working Group, including a summary of the candidate PCHM technologies identified and their associated benefits relative to NASA goals and objectives.
Issues in NASA Program and Project Management: Focus on Project Planning and Scheduling
NASA Technical Reports Server (NTRS)
Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)
1997-01-01
Topics addressed include: Planning and scheduling training for working project teams at NASA, overview of project planning and scheduling workshops, project planning at NASA, new approaches to systems engineering, software reliability assessment, and software reuse in wind tunnel control systems.
The Xyrem risk management program.
Fuller, David E; Hornfeldt, Carl S; Kelloway, Judy S; Stahl, Pamela J; Anderson, Todd F
2004-01-01
Sodium oxybate, also known as gamma-hydroxybutyric acid (GHB), was discovered in 1960 and has been described both as a therapeutic agent with high medical value and, more recently, a substance of abuse. The naturally occurring form of this drug is found in various body tissues but has been studied most extensively in the CNS where its possible function as a neurotransmitter continues to be studied. Sodium oxybate has been approved in different countries for such varied uses as general anaesthesia, the treatment of alcohol withdrawal and addiction, and, most recently, cataplexy associated with narcolepsy. During the 1980s, easy access to GHB-containing products led to various unapproved uses, including weight loss, bodybuilding and the treatment of sleeplessness, sometimes with serious long-term effects. The availability of these unapproved and unregulated forms of the drug led to GHB and its analogues being popularised as substances of abuse and subsequent notoriety as agents used in drug-facilitated sexual assault, or 'date rape', eventually leading to the prohibition of GHB sales in the US. Legal efforts to control the sale and distribution of GHB and its analogues nearly prevented the clinical development of sodium oxybate for narcolepsy in the US. However, following extensive discussions with a variety of interested parties, a satisfactory solution was devised, including legislative action and the development of the Xyrem Risk Management Program. Amendments to the US Controlled Substances Act made GHB a schedule I drug, but also contained provisions that allow US FDA-approved products to be placed under schedule III. This unique, bifurcated schedule for sodium oxybate/GHB allowed the clinical development of sodium oxybate to proceed and, in July 2002, it was approved by the FDA as an orphan drug for the treatment of cataplexy in patients with narcolepsy as Xyrem(sodium oxybate) oral solution. To promote the safe use of sodium oxybate, as well as alleviate concerns over possible diversion and abuse following product approval, a proprietary restricted drug distribution system was created, called the Xyrem Success Program. Components of the programme include a centralised distribution and dispensing system, a physician and patient registry, compulsory educational materials for patients and physicians, a specially trained pharmacy staff, a method for tracking prescription shipments, and an initial post-marketing surveillance programme. The system has created a unique opportunity to provide both physician and patient education and ongoing patient counselling, promoting greater drug safety and enhanced patient compliance.
Li, Xiangyong; Rafaliya, N; Baki, M Fazle; Chaouch, Ben A
2017-03-01
Scheduling of surgeries in the operating rooms under limited competing resources such as surgical and nursing staff, anesthesiologist, medical equipment, and recovery beds in surgical wards is a complicated process. A well-designed schedule should be concerned with the welfare of the entire system by allocating the available resources in an efficient and effective manner. In this paper, we develop an integer linear programming model in a manner useful for multiple goals for optimally scheduling elective surgeries based on the availability of surgeons and operating rooms over a time horizon. In particular, the model is concerned with the minimization of the following important goals: (1) the anticipated number of patients waiting for service; (2) the underutilization of operating room time; (3) the maximum expected number of patients in the recovery unit; and (4) the expected range (the difference between maximum and minimum expected number) of patients in the recovery unit. We develop two goal programming (GP) models: lexicographic GP model and weighted GP model. The lexicographic GP model schedules operating rooms when various preemptive priority levels are given to these four goals. A numerical study is conducted to illustrate the optimal master-surgery schedule obtained from the models. The numerical results demonstrate that when the available number of surgeons and operating rooms is known without error over the planning horizon, the proposed models can produce good schedules and priority levels and preference weights of four goals affect the resulting schedules. The results quantify the tradeoffs that must take place as the preemptive-weights of the four goals are changed.
NASA Technical Reports Server (NTRS)
Dupnick, E.; Wiggins, D.
1980-01-01
The scheduling algorithm for mission planning and logistics evaluation (SAMPLE) is presented. Two major subsystems are included: The mission payloads program; and the set covering program. Formats and parameter definitions for the payload data set (payload model), feasible combination file, and traffic model are documented.
A Model Schedule for a Capital Improvement Program.
ERIC Educational Resources Information Center
Oates, Arnold D.; Burch, A. Lee
The Model Schedule for a Capital Improvement Program described in this paper encourages school leaders to consider a more holistic view of the planning process. It is intended to assist those responsible for educational facility planning, who must assure that all important and relevant tasks are accomplished in a timely manner. The model's six…
Government Style as a Factor in Information Flow: Television Programming in Argentina, l979-l988.
ERIC Educational Resources Information Center
John, Jeffrey Alan
Noting that Argentina's recent history is particularly useful for analysis of the varying effects that differing government styles can have on a single mass communication system, a study compared Argentine (specifically Buenos Aires) television's 1979 programming schedule, prepared during a military dictatorship, with recent schedules prepared…
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self-help programs). 8.29 Section 8.29...), Turnkey III and Indian housing mutual self-help programs). Any housing units newly constructed or...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self-help programs). 8.29 Section 8.29...), Turnkey III and Indian housing mutual self-help programs). Any housing units newly constructed or...
40 CFR 147.650 - State-administrative program-Class I, II, III, IV, and V wells.
Code of Federal Regulations, 2010 CFR
2010-07-01
... CONTROL PROGRAMS Idaho § 147.650 State-administrative program—Class I, II, III, IV, and V wells. The UIC program for Class I, II, III, IV, and V wells in the State of Idaho, other than those on Indian lands, is the program administered by the Idaho Department of Water Resources, approved by EPA pursuant to...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-10
...This major final rule with comment period addresses changes to the physician fee schedule, clinical laboratory fee schedule, and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. This final rule with comment period also includes a discussion in the Supplementary Information regarding various programs. (See the Table of Contents for a listing of the specific issues addressed in the final rule with comment period.)
White, Kari; Garces, Isabel C; Bandura, Lisa; McGuire, Allison A; Scarinci, Isabel C
2012-01-01
Breast and cervical cancer are common among Latinas, but screening rates among foreign-born Latinas are relatively low. In this article we describe the design and implementation of a theory-based (PEN-3) outreach program to promote breast and cervical cancer screening to Latina immigrants, and evaluate the program's effectiveness. We used data from self-administered questionnaires completed at six annual outreach events to examine the sociodemographic characteristics of attendees and evaluate whether the program reached the priority population - foreign-born Latina immigrants with limited access to health care and screening services. To evaluate the program's effectiveness in connecting women to screening, we examined the proportion and characteristics of women who scheduled and attended Pap smear and mammography appointments. Among the 782 Latinas who attended the outreach program, 60% and 83% had not had a Pap smear or mammogram, respectively, in at least a year. Overall, 80% scheduled a Pap smear and 78% scheduled a mammogram. Women without insurance, who did not know where to get screening and had not been screened in the last year were more likely to schedule appointments (P < .05). Among women who scheduled appointments, 65% attended their Pap smear and 79% attended the mammogram. We did not identify significant differences in sociodemographic characteristics associated with appointment attendance. Using a theoretical approach to outreach design and implementation, it is possible to reach a substantial number of Latina immigrants and connect them to cancer screening services.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-01
... DEPARTMENT OF EDUCATION Implementation of Title I/II Program Initiatives; Extension of Public Comment Period; Correction AGENCY: Department of Education. ACTION: Correction notice. SUMMARY: On October... Title I/II Program Initiatives,'' Docket ID ED- 2013-ICCD-0090. The comment period for this information...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-11
...; Comment Request; Implementation of Title I/II Program Initiatives AGENCY: Institute of Educational... note that written comments received in response to this notice will be considered public records. Title of Collection: Implementation of Title I/II Program Initiatives. OMB Control Number: 1850-New. Type...
5 CFR 532.265 - Special wage schedules for apprentices and shop trainees.
Code of Federal Regulations, 2012 CFR
2012-01-01
... and shop trainees. 532.265 Section 532.265 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT... schedules for apprentices and shop trainees. (a) Agencies may establish special wage schedules for apprentices and shop trainees who are included in: (1) Formal apprenticeship programs involving training for...
5 CFR 532.265 - Special wage schedules for apprentices and shop trainees.
Code of Federal Regulations, 2013 CFR
2013-01-01
... and shop trainees. 532.265 Section 532.265 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT... schedules for apprentices and shop trainees. (a) Agencies may establish special wage schedules for apprentices and shop trainees who are included in: (1) Formal apprenticeship programs involving training for...
5 CFR 532.265 - Special wage schedules for apprentices and shop trainees.
Code of Federal Regulations, 2014 CFR
2014-01-01
... and shop trainees. 532.265 Section 532.265 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT... schedules for apprentices and shop trainees. (a) Agencies may establish special wage schedules for apprentices and shop trainees who are included in: (1) Formal apprenticeship programs involving training for...
5 CFR 532.265 - Special wage schedules for apprentices and shop trainees.
Code of Federal Regulations, 2011 CFR
2011-01-01
... and shop trainees. 532.265 Section 532.265 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT... schedules for apprentices and shop trainees. (a) Agencies may establish special wage schedules for apprentices and shop trainees who are included in: (1) Formal apprenticeship programs involving training for...
5 CFR 532.265 - Special wage schedules for apprentices and shop trainees.
Code of Federal Regulations, 2010 CFR
2010-01-01
... and shop trainees. 532.265 Section 532.265 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT... schedules for apprentices and shop trainees. (a) Agencies may establish special wage schedules for apprentices and shop trainees who are included in: (1) Formal apprenticeship programs involving training for...
20 CFR 614.12 - Schedules of remuneration.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Schedules of remuneration. 614.12 Section 614.12 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR UNEMPLOYMENT... Forces, with a statement of the effective date of the schedule. Benefit amounts for the UCX Program are...
Applying Resource Based Relative Value Scales (RBRVS) to the Champus Program
1990-12-01
fee for the related service .[Ref. 6:p. 7] F. EFFECTS OF RBRVS When a Medicare fee schedule is fully implemented, several Important...reimbursement rates increase would be attracted to CHAMPUS. In analyzing the impact of a resource based fee schedule on the Medicare program, the PPRC...procedures performed by physicians into components of work, training costs, and practice costs. The Medicare program is planning to implement a fee
Programmed environment management of confined microsocieties
NASA Technical Reports Server (NTRS)
Emurian, Henry H.
1988-01-01
A programmed environment is described that assists the implementation and management of schedules governing access to all resources and information potentially available to members of a confined microsociety. Living and work schedules are presented that were designed to build individual and group performance repertoires in support of study objectives and sustained adaptation by participants. A variety of measurement requirements can be programmed and standardized to assure continuous assessment of the status and health of a confined microsociety.
Smalley, Hannah K; Keskinocak, Pinar
2016-03-01
At academic teaching hospitals around the country, the majority of clinical care is provided by resident physicians. During their training, medical residents often rotate through various hospitals and/or medical services to maximize their education. Depending on the size of the training program, manually constructing such a rotation schedule can be cumbersome and time consuming. Further, rules governing allowable duty hours for residents have grown more restrictive in recent years (ACGME 2011), making day-to-day shift scheduling of residents more difficult (Connors et al., J Thorac Cardiovasc Surg 137:710-713, 2009; McCoy et al., May Clin Proc 86(3):192, 2011; Willis et al., J Surg Edu 66(4):216-221, 2009). These rules limit lengths of duty periods, allowable duty hours in a week, and rest periods, to name a few. In this paper, we present two integer programming models (IPs) with the goals of (1) creating feasible assignments of residents to rotations over a one-year period, and (2) constructing night and weekend call-shift schedules for the individual rotations. These models capture various duty-hour rules and constraints, provide the ability to test multiple what-if scenarios, and largely automate the process of schedule generation, solving these scheduling problems more effectively and efficiently compared to manual methods. Applying our models on data from a surgical residency program, we highlight the infeasibilities created by increased duty-hour restrictions placed on residents in conjunction with current scheduling paradigms.
Yu, Rong; Zhong, Weifeng; Xie, Shengli; Zhang, Yan; Zhang, Yun
2016-02-01
As the next-generation power grid, smart grid will be integrated with a variety of novel communication technologies to support the explosive data traffic and the diverse requirements of quality of service (QoS). Cognitive radio (CR), which has the favorable ability to improve the spectrum utilization, provides an efficient and reliable solution for smart grid communications networks. In this paper, we study the QoS differential scheduling problem in the CR-based smart grid communications networks. The scheduler is responsible for managing the spectrum resources and arranging the data transmissions of smart grid users (SGUs). To guarantee the differential QoS, the SGUs are assigned to have different priorities according to their roles and their current situations in the smart grid. Based on the QoS-aware priority policy, the scheduler adjusts the channels allocation to minimize the transmission delay of SGUs. The entire transmission scheduling problem is formulated as a semi-Markov decision process and solved by the methodology of adaptive dynamic programming. A heuristic dynamic programming (HDP) architecture is established for the scheduling problem. By the online network training, the HDP can learn from the activities of primary users and SGUs, and adjust the scheduling decision to achieve the purpose of transmission delay minimization. Simulation results illustrate that the proposed priority policy ensures the low transmission delay of high priority SGUs. In addition, the emergency data transmission delay is also reduced to a significantly low level, guaranteeing the differential QoS in smart grid.
76 FR 24469 - Combined Notice of Filings #2
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-02
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings 2 Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10-3329-003... Corporation submits tariff filing per 35.13(a)(2)(iii: Rate Schedule No. 119 of Florida Power Corporation to...
46 CFR 109.301 - Operational readiness, maintenance, and inspection of lifesaving equipment.
Code of Federal Regulations, 2012 CFR
2012-10-01
... and cleaning each fuel tank, and refilling it with fresh fuel. (2) Each davit, winch, fall and other...(e); (ii) Maintenance and repair instructions; (iii) A schedule of periodic maintenance; (iv) A... repair equipment. Spare parts and repair equipment must be provided for each lifesaving appliance and...
46 CFR 109.301 - Operational readiness, maintenance, and inspection of lifesaving equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... and cleaning each fuel tank, and refilling it with fresh fuel. (2) Each davit, winch, fall and other...(e); (ii) Maintenance and repair instructions; (iii) A schedule of periodic maintenance; (iv) A... repair equipment. Spare parts and repair equipment must be provided for each lifesaving appliance and...
46 CFR 109.301 - Operational readiness, maintenance, and inspection of lifesaving equipment.
Code of Federal Regulations, 2014 CFR
2014-10-01
... and cleaning each fuel tank, and refilling it with fresh fuel. (2) Each davit, winch, fall and other...(e); (ii) Maintenance and repair instructions; (iii) A schedule of periodic maintenance; (iv) A... repair equipment. Spare parts and repair equipment must be provided for each lifesaving appliance and...
46 CFR 109.301 - Operational readiness, maintenance, and inspection of lifesaving equipment.
Code of Federal Regulations, 2013 CFR
2013-10-01
... and cleaning each fuel tank, and refilling it with fresh fuel. (2) Each davit, winch, fall and other...(e); (ii) Maintenance and repair instructions; (iii) A schedule of periodic maintenance; (iv) A... repair equipment. Spare parts and repair equipment must be provided for each lifesaving appliance and...
7 CFR 1206.30 - Establishment and membership.
Code of Federal Regulations, 2014 CFR
2014-01-01
... INFORMATION Mango Promotion, Research, and Information Order Definitions National Mango Promotion Board § 1206... name and Code Number as defined in the Harmonized Tariff Schedule of the United States. The initial allocation will be two seats for District I, three seats for District II, two seats for District III, and one...
7 CFR 1206.30 - Establishment and membership.
Code of Federal Regulations, 2012 CFR
2012-01-01
... INFORMATION Mango Promotion, Research, and Information Order Definitions National Mango Promotion Board § 1206... name and Code Number as defined in the Harmonized Tariff Schedule of the United States. The initial allocation will be two seats for District I, three seats for District II, two seats for District III, and one...
76 FR 49506 - Jose Gonzalo Zavaleta, M.D.; Denial of Application
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-10
.... More specifically, the Order alleged that Applicant prescribed a total of 75 dosage units of hydrocodone (including Lortab and/or Lorcet), which are schedule III narcotics; 20 dosage units of Xanax, a..., 2008, when Louisiana State Police received a call from a pharmacist that he had authorized...
49 CFR 1.44 - Reservation of authority.
Code of Federal Regulations, 2010 CFR
2010-10-01
... relating to safety fitness of an applicant (49 U.S.C. 1653(e)), the making of decisions on requests to... equivalent level: (i) Establishment or abolition of positions; (ii) Hires; (iii) Promotions other than quality and periodic within-grade promotions; (iv) Transfer of personnel to Schedule A, B, or C positions...
77 FR 55799 - Sunshine Act Notice
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-11
... Statutory Report Topic Approval and Scheduling of 2013 Briefings Adoption and Vote on 2013 USCCR Business Meeting Calendar Update on the Sex-Trafficking Briefing III. Management and Operations Chief of Regional.... ACTION: Notice of business meeting. DATE AND TIME: Friday, September 21, 2012; 9:30 a.m. EDT. PLACE: 1331...
78 FR 30861 - Sunshine Act Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-23
... Director III. Management and Operations Consideration of date change for the September 2013 business.... ACTION: Notice of Briefing and Business Meeting. DATE AND TIME: Friday, May 31, 2013 at 9:30 a.m. EST... seven business days before the scheduled date of the meeting. Dated: May 20, 2013. David Mussatt, Acting...
42 CFR 414.620 - Publication of the ambulance fee schedule.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Section 414.620 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) MEDICARE PROGRAM PAYMENT FOR PART B MEDICAL AND OTHER HEALTH SERVICES Fee Schedule for Ambulance Services § 414.620 Publication of the ambulance fee schedule. Changes in payment rates resulting...
40 CFR 52.240 - Compliance schedules.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Compliance schedules. 52.240 Section 52.240 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.240 Compliance schedules. (a) The requirements of § 51.262(a) of this chapter are...
40 CFR 52.240 - Compliance schedules.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Compliance schedules. 52.240 Section 52.240 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.240 Compliance schedules. (a) The requirements of § 51.262(a) of this chapter are...
40 CFR 52.240 - Compliance schedules.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Compliance schedules. 52.240 Section 52.240 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.240 Compliance schedules. (a) The requirements of § 51.262(a) of this chapter are...
40 CFR 52.240 - Compliance schedules.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Compliance schedules. 52.240 Section 52.240 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.240 Compliance schedules. (a) The requirements of § 51.262(a) of this chapter are...
40 CFR 52.240 - Compliance schedules.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Compliance schedules. 52.240 Section 52.240 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.240 Compliance schedules. (a) The requirements of § 51.262(a) of this chapter are...
40 CFR 78.13 - Scheduling orders and pre-hearing conferences.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 17 2013-07-01 2013-07-01 false Scheduling orders and pre-hearing conferences. 78.13 Section 78.13 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPEAL PROCEDURES § 78.13 Scheduling orders and pre-hearing conferences. (a) If a...
Code of Federal Regulations, 2010 CFR
2010-04-01
... Schedule A may apply for that labor certification under § 656.15. Schedule A (a) Group I: (1) Persons who... National Council of State Boards of Nursing. (3) Definitions of Group I occupations: (i) Physical therapist... illness in others. A program of study for professional nurses generally includes theory and practice in...
49 CFR 22.25 - Lender deliverables and delivery schedule.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 1 2010-10-01 2010-10-01 false Lender deliverables and delivery schedule. 22.25 Section 22.25 Transportation Office of the Secretary of Transportation SHORT-TERM LENDING PROGRAM (STLP) Participating Lenders § 22.25 Lender deliverables and delivery schedule. All Participating Lenders must adhere...
20 CFR 638.505 - Scheduling of training.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Scheduling of training. 638.505 Section 638.505 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR JOB CORPS PROGRAM UNDER TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Center Operations § 638.505 Scheduling of training...
Naval Postgraduate School Solar Cell Array Tester
2010-12-01
PROGRAM MANAGEMENT ................................45 1. SCHEDULE .....................................47 B. BUDGET...budget and schedule from December 2009 to September 2010. In addition, a total development cost estimate, including labor, equipment, and testing... scheduler becomes active, all tasks become eligible to run, and normal operations begin. Figure 21 shows a diagram of the startup actions [32
The pharmacologic and clinical effects of medical cannabis.
Borgelt, Laura M; Franson, Kari L; Nussbaum, Abraham M; Wang, George S
2013-02-01
Cannabis, or marijuana, has been used for medicinal purposes for many years. Several types of cannabinoid medicines are available in the United States and Canada. Dronabinol (schedule III), nabilone (schedule II), and nabiximols (not U.S. Food and Drug Administration approved) are cannabis-derived pharmaceuticals. Medical cannabis or medical marijuana, a leafy plant cultivated for the production of its leaves and flowering tops, is a schedule I drug, but patients obtain it through cannabis dispensaries and statewide programs. The effect that cannabinoid compounds have on the cannabinoid receptors (CB(1) and CB(2) ) found in the brain can create varying pharmacologic responses based on formulation and patient characteristics. The cannabinoid Δ(9) -tetrahydrocannabinol has been determined to have the primary psychoactive effects; the effects of several other key cannabinoid compounds have yet to be fully elucidated. Dronabinol and nabilone are indicated for the treatment of nausea and vomiting associated with cancer chemotherapy and of anorexia associated with weight loss in patients with acquired immune deficiency syndrome. However, pain and muscle spasms are the most common reasons that medical cannabis is being recommended. Studies of medical cannabis show significant improvement in various types of pain and muscle spasticity. Reported adverse effects are typically not serious, with the most common being dizziness. Safety concerns regarding cannabis include the increased risk of developing schizophrenia with adolescent use, impairments in memory and cognition, accidental pediatric ingestions, and lack of safety packaging for medical cannabis formulations. This article will describe the pharmacology of cannabis, effects of various dosage formulations, therapeutics benefits and risks of cannabis for pain and muscle spasm, and safety concerns of medical cannabis use. © 2013 Pharmacotherapy Publications, Inc.
Takahashi, Kayoko; Kamide, Naoto; Suzuki, Makoto; Fukuda, Michinari
2016-01-01
[Purpose] Maintaining high quality of life is crucial for the rehabilitation of patients with Parkinson's disease. The quality of life scales currently in use do not assess all quality of life domains or their importance for each individual. Therefore, a new quality of life measure, the Schedule for the Evaluation of Individual Quality of Life-Direct Weighting, was used to investigate quality of life in people with Parkinson's disease. [Subjects and Methods] Fifteen people with idiopathic Parkinson's disaese (average age = 80.0 years, standard deviation = 10.3 years, Hoehn & Yahr stages 1-4) were interviewed using the Schedule for the Evaluation of Individual Quality of Life-Direct Weighting. Its quality of life constructs were tested by comparing them against disease-specific quality of life (39-items Parkinson's Disease Questionnaire), motor functioning (Unified Parkinson's Disease Rating Scale Part III), and activities of daily living (Barthel Index). [Results] Social connections such as "family" and "friends" were revealed as important constructs of life satisfaction. The Schedule for the Evaluation of Individual Quality of Life-Direct Weighting was not significantly correlated with the 39-items Parkinson's Disease Questionnaire, Unified Parkinson's Disease Rating Scale Part III, or Barthel Index but was significantly correlated with the "communication" dimension of the 39-items Parkinson's Disease Questionnaire. [Conclusion] The Schedule for the Evaluation of Individual Quality of Life-Direct Weighting detected various domains of quality of life, especially social relationships with family and friends. "Being heard" was also revealed as an essential component of life satisfaction, as it provides patients with a feeling of acceptance and assurance, possibly resulting in better quality of life.
2017-11-15
This major final rule addresses changes to the Medicare physician fee schedule (PFS) and other Medicare Part B payment policies such as changes to the Medicare Shared Savings Program, to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services, as well as changes in the statute. In addition, this final rule includes policies necessary to begin offering the expanded Medicare Diabetes Prevention Program model.
NASA/NSF Antarctic Science Working Group
NASA Technical Reports Server (NTRS)
Stoklosa, Janis H.
1990-01-01
A collection of viewgraphs on NASA's Life Sciences Biomedical Programs is presented. They show the structure of the Life Sciences Division; the tentative space exploration schedule from the present to 2018; the biomedical programs with their objectives, research elements, and methodological approaches; validation models; proposed Antarctic research as an analog for space exploration; and the Science Working Group's schedule of events.
U. S. fusion programs: Struggling to stay in the game
DOE Office of Scientific and Technical Information (OSTI.GOV)
Crawford, M.
Funding for the US fusion energy program has suffered and will probably continue to suffer major cuts. A committee hand-picked by Energy Secretary James Watkins urged the Department of Energy to mount an aggressive program to develop fusion power, but congress cut funding from $323 million in 1990 to $275 million in 1991. This portends dire conditions for fusion research and development. Projects to receive top priority are concerned with the tokamaks and to keep the next big machine, the Burning Plasma Experiment, scheduled for beginning of construction in 1993 on schedule. Secretary Watkins is said to want to keepmore » the International Thermonuclear Energy Reactor (ITER) on schedule. ITER would follow the Burning Plasma Experiment.« less
2011-11-28
This final rule with comment period addresses changes to the physician fee schedule and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. It also addresses, implements or discusses certain statutory provisions including provisions of the Patient Protection and Affordable Care Act, as amended by the Health Care and Education Reconciliation Act of 2010 (collectively known as the Affordable Care Act) and the Medicare Improvements for Patients and Providers Act (MIPPA) of 2008. In addition, this final rule with comment period discusses payments for Part B drugs; Clinical Laboratory Fee Schedule: Signature on Requisition; Physician Quality Reporting System; the Electronic Prescribing (eRx) Incentive Program; the Physician Resource-Use Feedback Program and the value modifier; productivity adjustment for ambulatory surgical center payment system and the ambulance, clinical laboratory, and durable medical equipment prosthetics orthotics and supplies (DMEPOS) fee schedules; and other Part B related issues.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Novikov, V.
1991-05-01
The U.S. Army's detailed equipment decontamination process is a stochastic flow shop which has N independent non-identical jobs (vehicles) which have overlapping processing times. This flow shop consists of up to six non-identical machines (stations). With the exception of one station, the processing times of the jobs are random variables. Based on an analysis of the processing times, the jobs for the 56 Army heavy division companies were scheduled according to the best shortest expected processing time - longest expected processing time (SEPT-LEPT) sequence. To assist in this scheduling the Gap Comparison Heuristic was developed to select the best SEPT-LEPTmore » schedule. This schedule was then used in balancing the detailed equipment decon line in order to find the best possible site configuration subject to several constraints. The detailed troop decon line, in which all jobs are independent and identically distributed, was then balanced. Lastly, an NBC decon optimization computer program was developed using the scheduling and line balancing results. This program serves as a prototype module for the ANBACIS automated NBC decision support system.... Decontamination, Stochastic flow shop, Scheduling, Stochastic scheduling, Minimization of the makespan, SEPT-LEPT Sequences, Flow shop line balancing, ANBACIS.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-28
...This final rule with comment period addresses changes to the physician fee schedule and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. It also addresses, implements or discusses certain statutory provisions including provisions of the Patient Protection and Affordable Care Act, as amended by the Health Care and Education Reconciliation Act of 2010 (collectively known as the Affordable Care Act) and the Medicare Improvements for Patients and Providers Act (MIPPA) of 2008. In addition, this final rule with comment period discusses payments for Part B drugs; Clinical Laboratory Fee Schedule: Signature on Requisition; Physician Quality Reporting System; the Electronic Prescribing (eRx) Incentive Program; the Physician Resource-Use Feedback Program and the value modifier; productivity adjustment for ambulatory surgical center payment system and the ambulance, clinical laboratory, and durable medical equipment prosthetics orthotics and supplies (DMEPOS) fee schedules; and other Part B related issues.
1984-08-01
recommendations in the report with Martin Marietta over the next few months. Appropriate followup actions will be deter- mined, and any program changes...Technical Feasibility and Validity ...... . . .. 1-6 1.3.2 Program Schedule . . . . . . ......... . .. 1-7 1.3.3 NAS Plan Cost...343.1.1 Overview 3-1 3.1.2 Findings, Risks, and Recommendations . . . . . . . . . 3-3 3.2 Program Schedule . . . . . . . . . . * . . * . *. . 3-6
Determination of the Underlying Task Scheduling Algorithm for an Ada Runtime System
1989-12-01
was also curious as to how well I could model the test cases with Ada programs . In particular, I wanted to see whether I could model the equal arrival...parameter relationshis=s required to detect the execution of individual algorithms. These test cases were modeled using Ada programs . Then, the...results were analyzed to determine whether the Ada programs were capable of revealing the task scheduling algorithm used by the Ada run-time system. This
The nurse scheduling problem: a goal programming and nonlinear optimization approaches
NASA Astrophysics Data System (ADS)
Hakim, L.; Bakhtiar, T.; Jaharuddin
2017-01-01
Nurses scheduling is an activity of allocating nurses to conduct a set of tasks at certain room at a hospital or health centre within a certain period. One of obstacles in the nurse scheduling is the lack of resources in order to fulfil the needs of the hospital. Nurse scheduling which is undertaken manually will be at risk of not fulfilling some nursing rules set by the hospital. Therefore, this study aimed to perform scheduling models that satisfy all the specific rules set by the management of Bogor State Hospital. We have developed three models to overcome the scheduling needs. Model 1 is designed to schedule nurses who are solely assigned to a certain inpatient unit and Model 2 is constructed to manage nurses who are assigned to an inpatient room as well as at Polyclinic room as conjunct nurses. As the assignment of nurses on each shift is uneven, then we propose Model 3 to minimize the variance of the workload in order to achieve equitable assignment on every shift. The first two models are formulated in goal programming framework, while the last model is in nonlinear optimization form.
NASA Technical Reports Server (NTRS)
1992-01-01
Even though the executive branch has proposed terminating the Advanced Solid Rocket Motor (ASRM) program, NASA is proceeding with all construction activity planned for FY 1992 to avoid schedule slippage if the program is reinstated by Congress. However, NASA could delay some construction activities for at least a few months without affecting the current launch data schedule. For example, NASA could delay Yellow Creek's motor storage and dock projects, Stennis' dock project, and Kennedy's rotation processing and surge facility and dock projects. Starting all construction activities as originally planned could result in unnecessarily incurring additional costs and termination liability if the funding for FY 1993 is not provided. If Congress decides to continue the program, construction could still be completed in time to avoid schedule slippage.
Verification and Planning Based on Coinductive Logic Programming
NASA Technical Reports Server (NTRS)
Bansal, Ajay; Min, Richard; Simon, Luke; Mallya, Ajay; Gupta, Gopal
2008-01-01
Coinduction is a powerful technique for reasoning about unfounded sets, unbounded structures, infinite automata, and interactive computations [6]. Where induction corresponds to least fixed point's semantics, coinduction corresponds to greatest fixed point semantics. Recently coinduction has been incorporated into logic programming and an elegant operational semantics developed for it [11, 12]. This operational semantics is the greatest fix point counterpart of SLD resolution (SLD resolution imparts operational semantics to least fix point based computations) and is termed co- SLD resolution. In co-SLD resolution, a predicate goal p( t) succeeds if it unifies with one of its ancestor calls. In addition, rational infinite terms are allowed as arguments of predicates. Infinite terms are represented as solutions to unification equations and the occurs check is omitted during the unification process. Coinductive Logic Programming (Co-LP) and Co-SLD resolution can be used to elegantly perform model checking and planning. A combined SLD and Co-SLD resolution based LP system forms the common basis for planning, scheduling, verification, model checking, and constraint solving [9, 4]. This is achieved by amalgamating SLD resolution, co-SLD resolution, and constraint logic programming [13] in a single logic programming system. Given that parallelism in logic programs can be implicitly exploited [8], complex, compute-intensive applications (planning, scheduling, model checking, etc.) can be executed in parallel on multi-core machines. Parallel execution can result in speed-ups as well as in larger instances of the problems being solved. In the remainder we elaborate on (i) how planning can be elegantly and efficiently performed under real-time constraints, (ii) how real-time systems can be elegantly and efficiently model- checked, as well as (iii) how hybrid systems can be verified in a combined system with both co-SLD and SLD resolution. Implementations of co-SLD resolution as well as preliminary implementations of the planning and verification applications have been developed [4]. Co-LP and Model Checking: The vast majority of properties that are to be verified can be classified into safety properties and liveness properties. It is well known within model checking that safety properties can be verified by reachability analysis, i.e, if a counter-example to the property exists, it can be finitely determined by enumerating all the reachable states of the Kripke structure.
From non-preemptive to preemptive scheduling using synchronization synthesis.
Černý, Pavol; Clarke, Edmund M; Henzinger, Thomas A; Radhakrishna, Arjun; Ryzhyk, Leonid; Samanta, Roopsha; Tarrach, Thorsten
2017-01-01
We present a computer-aided programming approach to concurrency. The approach allows programmers to program assuming a friendly, non-preemptive scheduler, and our synthesis procedure inserts synchronization to ensure that the final program works even with a preemptive scheduler. The correctness specification is implicit, inferred from the non-preemptive behavior. Let us consider sequences of calls that the program makes to an external interface. The specification requires that any such sequence produced under a preemptive scheduler should be included in the set of sequences produced under a non-preemptive scheduler. We guarantee that our synthesis does not introduce deadlocks and that the synchronization inserted is optimal w.r.t. a given objective function. The solution is based on a finitary abstraction, an algorithm for bounded language inclusion modulo an independence relation, and generation of a set of global constraints over synchronization placements. Each model of the global constraints set corresponds to a correctness-ensuring synchronization placement. The placement that is optimal w.r.t. the given objective function is chosen as the synchronization solution. We apply the approach to device-driver programming, where the driver threads call the software interface of the device and the API provided by the operating system. Our experiments demonstrate that our synthesis method is precise and efficient. The implicit specification helped us find one concurrency bug previously missed when model-checking using an explicit, user-provided specification. We implemented objective functions for coarse-grained and fine-grained locking and observed that different synchronization placements are produced for our experiments, favoring a minimal number of synchronization operations or maximum concurrency, respectively.
Luczynski, Kevin C; Hanley, Gregory P
2014-01-01
Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable. © Society for the Experimental Analysis of Behavior.
10 CFR Appendix A to Part 602 - Schedule of Renewal Applications and Reports
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 4 2012-01-01 2012-01-01 false Schedule of Renewal Applications and Reports A Appendix A to Part 602 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS EPIDEMIOLOGY AND OTHER HEALTH STUDIES FINANCIAL ASSISTANCE PROGRAM Pt. 602, App. A Appendix A to Part 602—Schedule of Renewal...
10 CFR Appendix A to Part 602 - Schedule of Renewal Applications and Reports
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 4 2013-01-01 2013-01-01 false Schedule of Renewal Applications and Reports A Appendix A to Part 602 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS EPIDEMIOLOGY AND OTHER HEALTH STUDIES FINANCIAL ASSISTANCE PROGRAM Pt. 602, App. A Appendix A to Part 602—Schedule of Renewal...
10 CFR Appendix A to Part 602 - Schedule of Renewal Applications and Reports
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 4 2014-01-01 2014-01-01 false Schedule of Renewal Applications and Reports A Appendix A to Part 602 Energy DEPARTMENT OF ENERGY (CONTINUED) ASSISTANCE REGULATIONS EPIDEMIOLOGY AND OTHER HEALTH STUDIES FINANCIAL ASSISTANCE PROGRAM Pt. 602, App. A Appendix A to Part 602—Schedule of Renewal...
User’s guide to SNAP for ArcGIS® :ArcGIS interface for scheduling and network analysis program
Woodam Chung; Dennis Dykstra; Fred Bower; Stephen O’Brien; Richard Abt; John. and Sessions
2012-01-01
This document introduces a computer software named SNAP for ArcGIS® , which has been developed to streamline scheduling and transportation planning for timber harvest areas. Using modern optimization techniques, it can be used to spatially schedule timber harvest with consideration of harvesting costs, multiple products, alternative...
1987-09-15
MAC; CODE NUMBER: NONE AND REPAIR PARTS AND SPECIAL TOOLS LIST (RPSTL). RESPONSIBILITY: ROY & ILS DURATION: 32.00 WORK DAYS PRE PPPL SCHEDULE...ILS DURATION: 22.00 WORK DAYS R/V PPPL SCHEDULE: DVPMARPS REVIEW AND VALIDATE PRELIMINARY PROVISIONING PARTS LIST. CODE NUMBER: NONE RESPONSIBILITY
A primary shift rotation nurse scheduling using zero-one linear goal programming.
Huarng, F
1999-01-01
In this study, the author discusses the effect of nurse shift schedules on circadian rhythm and some important ergonomics criteria. The author also reviews and compares different nurse shift scheduling methods via the criteria of flexibility, fairness, continuity in shift assignments, nurses' preferences, and ergonomics principles. In this article, a primary shift rotation system is proposed to provide better continuity in shift assignments to satisfy nurses' preferences. The primary shift rotation system is modeled as a zero-one linear goal programming (LGP) problem. To generate the shift assignment for a unit with 13 nurses, the zero-one LGP model takes less than 3 minutes on average, whereas the head nurses spend approximately 2 to 3 hours on shift scheduling. This study reports the process of implementing the primary shift rotation system.
Impact of a Student-Scheduled Child Care Program on Parents' Educational Goals
ERIC Educational Resources Information Center
Carter, Barbara
2016-01-01
The purpose of this study is to examine what, if any, impact a Student-scheduled Child Care (SSCC) program had on the families of students completing their higher education goals at a college in the southwestern region of the United States. Student completion rate is a concern for most college and university administrators. Research conducted by…
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Physical Protection of Irradiated Reactor Fuel in Transit... Irradiated Reactor Fuel in Transit, Training Program Subject Schedule Pursuant to the provision of § 73.37 of... reactor fuel is required to assure that individuals used as shipment escorts have completed a training...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Physical Protection of Irradiated Reactor Fuel in Transit... Irradiated Reactor Fuel in Transit, Training Program Subject Schedule Pursuant to the provision of § 73.37 of... reactor fuel is required to assure that individuals used as shipment escorts have completed a training...
Autonomous power expert system
NASA Technical Reports Server (NTRS)
Ringer, Mark J.; Quinn, Todd M.
1990-01-01
The goal of the Autonomous Power System (APS) program is to develop and apply intelligent problem solving and control technologies to the Space Station Freedom Electrical Power Systems (SSF/EPS). The objectives of the program are to establish artificial intelligence/expert system technology paths, to create knowledge based tools with advanced human-operator interfaces, and to integrate and interface knowledge-based and conventional control schemes. This program is being developed at the NASA-Lewis. The APS Brassboard represents a subset of a 20 KHz Space Station Power Management And Distribution (PMAD) testbed. A distributed control scheme is used to manage multiple levels of computers and switchgear. The brassboard is comprised of a set of intelligent switchgear used to effectively switch power from the sources to the loads. The Autonomous Power Expert System (APEX) portion of the APS program integrates a knowledge based fault diagnostic system, a power resource scheduler, and an interface to the APS Brassboard. The system includes knowledge bases for system diagnostics, fault detection and isolation, and recommended actions. The scheduler autonomously assigns start times to the attached loads based on temporal and power constraints. The scheduler is able to work in a near real time environment for both scheduling and dynamic replanning.
Autonomous power expert system
NASA Technical Reports Server (NTRS)
Ringer, Mark J.; Quinn, Todd M.
1990-01-01
The goal of the Autonomous Power System (APS) program is to develop and apply intelligent problem solving and control technologies to the Space Station Freedom Electrical Power Systems (SSF/EPS). The objectives of the program are to establish artificial intelligence/expert system technology paths, to create knowledge based tools with advanced human-operator interfaces, and to integrate and interface knowledge-based and conventional control schemes. This program is being developed at the NASA-Lewis. The APS Brassboard represents a subset of a 20 KHz Space Station Power Management And Distribution (PMAD) testbed. A distributed control scheme is used to manage multiple levels of computers and switchgear. The brassboard is comprised of a set of intelligent switchgear used to effectively switch power from the sources to the loads. The Autonomous Power Expert System (APEX) portion of the APS program integrates a knowledge based fault diagnostic system, a power resource scheduler, and an interface to the APS Brassboard. The system includes knowledge bases for system diagnostics, fault detection and isolation, and recommended actions. The scheduler autonomously assigns start times to the attached loads based on temporal and power constraints. The scheduler is able to work in a near real time environment for both scheduling an dynamic replanning.
2013-03-01
33 Mario Vanhoucke and Stephan Vandevoorde – “Measuring the Accuracy of Earned Value/Earned Schedule Forecasting Predictors” (2007...technical problem to the present day ‘ super projects’” (Clark and Lorenzoni, 1997: 2). Cost engineering has “application regardless of industry...large construction projects, but also the acceptance of earned schedule principles on an international scale. Mario Vanhoucke and Stephan Vandevoorde
A Network Flow Approach to the Initial Skills Training Scheduling Problem
2007-12-01
include (but are not limited to) queuing theory, stochastic analysis and simulation. After the demand schedule has been estimated, it can be ...software package has already been purchased and is in use by AFPC, AFPC has requested that the new algorithm be programmed in this language as well ...the discussed outputs from those schedules. Required Inputs A single input file details the students to be scheduled as well as the courses
Range and mission scheduling automation using combined AI and operations research techniques
NASA Technical Reports Server (NTRS)
Arbabi, Mansur; Pfeifer, Michael
1987-01-01
Ground-based systems for Satellite Command, Control, and Communications (C3) operations require a method for planning, scheduling and assigning the range resources such as: antenna systems scattered around the world, communications systems, and personnel. The method must accommodate user priorities, last minute changes, maintenance requirements, and exceptions from nominal requirements. Described are computer programs which solve 24 hour scheduling problems, using heuristic algorithms and a real time interactive scheduling process.
Scheduling Guide for Program Managers
2001-10-01
58 Chapter 8 TIME MANAGEMENT ....................................................................................... 59...8.1 Time Management and the Program...60 8.2 Time Management and the Program Manager
Integrating an HTLV-III Screening Program into a Community Based Family Health Service Agency.
ERIC Educational Resources Information Center
Klausmeier, Walter W.; Henshaw, Beverly
Acquired Immune Deficiency Syndrome (AIDS) has become one of the most serious epidemic disease problems in recent years. In 1985 the Public Health Service recommended establishment of test sites where individuals might be tested for Human T Lymphotropic Virus III (HTLV-III) antibody. An HTLV-III antibody screening program was integrated into a…
7 CFR 1951.223 - Reamortization.
Code of Federal Regulations, 2012 CFR
2012-01-01
... adjusted to no less than the poverty interest rate and the term of the loans may be extended up to a new 40... delinquent amount. Accrued interest will be at the rate currently reflected in Finance Office records. (1...; and (E) The interest rate. (iii) A payment will be due on the next scheduled due date. Deferment of...
7 CFR 1951.223 - Reamortization.
Code of Federal Regulations, 2011 CFR
2011-01-01
... adjusted to no less than the poverty interest rate and the term of the loans may be extended up to a new 40... delinquent amount. Accrued interest will be at the rate currently reflected in Finance Office records. (1...; and (E) The interest rate. (iii) A payment will be due on the next scheduled due date. Deferment of...
7 CFR 1951.223 - Reamortization.
Code of Federal Regulations, 2013 CFR
2013-01-01
... adjusted to no less than the poverty interest rate and the term of the loans may be extended up to a new 40... delinquent amount. Accrued interest will be at the rate currently reflected in Finance Office records. (1...; and (E) The interest rate. (iii) A payment will be due on the next scheduled due date. Deferment of...
7 CFR 1951.223 - Reamortization.
Code of Federal Regulations, 2014 CFR
2014-01-01
... adjusted to no less than the poverty interest rate and the term of the loans may be extended up to a new 40... delinquent amount. Accrued interest will be at the rate currently reflected in Finance Office records. (1...; and (E) The interest rate. (iii) A payment will be due on the next scheduled due date. Deferment of...
33 CFR 401.80 - Reporting dangerous cargo.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Reporting dangerous cargo. 401.80... dangerous cargo. (a) The master of any explosive vessel or hazardous cargo vessel shall report to a Seaway station, as set out in Schedule III, the nature, quantity, and IMO classification of the dangerous cargo...
33 CFR 401.80 - Reporting dangerous cargo.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Reporting dangerous cargo. 401.80... dangerous cargo. (a) The master of any explosive vessel or hazardous cargo vessel shall report to a Seaway station, as set out in Schedule III, the nature, quantity, and IMO classification of the dangerous cargo...
33 CFR 401.80 - Reporting dangerous cargo.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Reporting dangerous cargo. 401.80... dangerous cargo. (a) The master of any explosive vessel or hazardous cargo vessel shall report to a Seaway station, as set out in Schedule III, the nature, quantity, and IMO classification of the dangerous cargo...
33 CFR 401.80 - Reporting dangerous cargo.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Reporting dangerous cargo. 401.80... dangerous cargo. (a) The master of any explosive vessel or hazardous cargo vessel shall report to a Seaway station, as set out in Schedule III, the nature, quantity, and IMO classification of the dangerous cargo...
33 CFR 401.80 - Reporting dangerous cargo.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Reporting dangerous cargo. 401.80... dangerous cargo. (a) The master of any explosive vessel or hazardous cargo vessel shall report to a Seaway station, as set out in Schedule III, the nature, quantity, and IMO classification of the dangerous cargo...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-03
... Change Relating to the Equity Options Fees and Singly Listed Option Fee March 28, 2012. Pursuant to... entitled ``Equity Options Fees'' to assess Professionals an Options Surcharge in certain Multiply Listed Options; (ii) amend Section III \\4\\ of the Fee Schedule entitled ``Singly Listed Options'' to specify...
46 CFR 525.3 - Availability of marine terminal operator schedules.
Code of Federal Regulations, 2013 CFR
2013-10-01
... that is made available to the public shall be available during normal business hours and in electronic... computer (PC) by: (1) Dial-up connection via public switched telephone networks (PSTN); or (2) The Internet... incoming calls, (ii) Smart terminal capability for VT-100 terminal or terminal emulation access, and (iii...
46 CFR 525.3 - Availability of marine terminal operator schedules.
Code of Federal Regulations, 2012 CFR
2012-10-01
... that is made available to the public shall be available during normal business hours and in electronic... computer (PC) by: (1) Dial-up connection via public switched telephone networks (PSTN); or (2) The Internet... incoming calls, (ii) Smart terminal capability for VT-100 terminal or terminal emulation access, and (iii...
46 CFR 525.3 - Availability of marine terminal operator schedules.
Code of Federal Regulations, 2014 CFR
2014-10-01
... that is made available to the public shall be available during normal business hours and in electronic... computer (PC) by: (1) Dial-up connection via public switched telephone networks (PSTN); or (2) The Internet... incoming calls, (ii) Smart terminal capability for VT-100 terminal or terminal emulation access, and (iii...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-19
... relationships between the clinical time spent by physicians and the time that is currently part of the fee... clinical time and fee-schedule time values for surveyed services; (ii) how consistent the relationships are across services and across specialties; (iii) whether the relationships vary across physicians in...
14 CFR Section 21 - Introduction to System of Reports
Code of Federal Regulations, 2010 CFR
2010-01-01
... classification of large certificated air carriers into Group I, Group II, and Group III with the form and content differentiated as between groups. (d) Each schedule of the prescribed BTS Form 41 Report has been assigned a... U.S. Virgin Islands, and shall also include Canadian transborder operations. The reports to be...
24 CFR 982.555 - Informal hearing for participant.
Code of Federal Regulations, 2010 CFR
2010-04-01
... allowance schedule. (iii) A determination of the family unit size under the PHA subsidy standards. (iv) A... appropriate for the family unit size under the PHA subsidy standards, or the PHA determination to deny the... with HQS because of the family size. (8) A determination by the PHA to exercise or not to exercise any...
76 FR 78044 - Controlled Substances: Established Aggregate Production Quotas for 2012
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-15
... that the 2012 aggregate production quotas for the following controlled substances, expressed in grams... Methamphetamine 3,130,000 g [750,000 grams of levo-desoxyephedrine for use in a non-controlled, non- prescription product; 2,331,000 grams for methamphetamine mostly for conversion to a Schedule III product; and 49,000...
33 CFR Schedule III to Subpart A... - Calling-in Table
Code of Federal Regulations, 2012 CFR
2012-07-01
... 1. Name of vessel.2. Location. 3. ETA Cape Vincent or River Port. 15. Whale back Shoal—Con ......do... transiting from the Lower St. Lawrence River Seaway Beauharnois, channel 14 1. Name of vessel.2. Location. 3... classification; location where dangerous cargo is stowed. 7. Pilot requirement—Lake Ontario. 8. Confirm pilot...
33 CFR Schedule III to Subpart A... - Calling-in Table
Code of Federal Regulations, 2011 CFR
2011-07-01
... 1. Name of vessel.2. Location. 3. ETA Cape Vincent or River Port. 15. Whale back Shoal—Con ......do... transiting from the Lower St. Lawrence River Seaway Beauharnois, channel 14 1. Name of vessel.2. Location. 3... classification; location where dangerous cargo is stowed. 7. Pilot requirement—Lake Ontario. 8. Confirm pilot...
33 CFR Schedule III to Subpart A... - Calling-in Table
Code of Federal Regulations, 2013 CFR
2013-07-01
... 1. Name of vessel.2. Location. 3. ETA Cape Vincent or River Port. 15. Whale back Shoal—Con ......do... transiting from the Lower St. Lawrence River Seaway Beauharnois, channel 14 1. Name of vessel.2. Location. 3... classification; location where dangerous cargo is stowed. 7. Pilot requirement—Lake Ontario. 8. Confirm pilot...
33 CFR Schedule III to Subpart A... - Calling-in Table
Code of Federal Regulations, 2014 CFR
2014-07-01
... 1. Name of vessel.2. Location. 3. ETA Cape Vincent or River Port. 15. Whale back Shoal—Con ......do... transiting from the Lower St. Lawrence River Seaway Beauharnois, channel 14 1. Name of vessel.2. Location. 3... classification; location where dangerous cargo is stowed. 7. Pilot requirement—Lake Ontario. 8. Confirm pilot...
Code of Federal Regulations, 2011 CFR
2011-01-01
... provisions of this part shall be made by the agency of USDA to which the person has applied for benefits. All...; (iii) Whether the conservation plan that a person is applying is based on the local NRCS field office... being applied on highly erodible fields in accordance with the schedule specified therein or whether a...
9 CFR 113.312 - Rabies Vaccine, Live Virus.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Rabies Vaccine, Live Virus. 113.312... Virus Vaccines § 113.312 Rabies Vaccine, Live Virus. Rabies Vaccine shall be prepared from virus-bearing... administration. (iii) Observe all animals for signs of rabies until scheduled time to sacrifice. If animals show...
40 CFR 265.1064 - Recordkeeping requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
...). (iii) Type of equipment (e.g., a pump or pipeline valve). (iv) Percent-by-weight total organics in the...)(2), an implementation schedule as specified in § 265.1033(a)(2). (3) Where an owner or operator... concentration achieved by the control device, a performance test plan as specified in § 265.1035(b)(3). (4...
40 CFR 265.1064 - Recordkeeping requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
...). (iii) Type of equipment (e.g., a pump or pipeline valve). (iv) Percent-by-weight total organics in the...)(2), an implementation schedule as specified in § 265.1033(a)(2). (3) Where an owner or operator... concentration achieved by the control device, a performance test plan as specified in § 265.1035(b)(3). (4...
40 CFR 265.1064 - Recordkeeping requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
...). (iii) Type of equipment (e.g., a pump or pipeline valve). (iv) Percent-by-weight total organics in the...)(2), an implementation schedule as specified in § 265.1033(a)(2). (3) Where an owner or operator... concentration achieved by the control device, a performance test plan as specified in § 265.1035(b)(3). (4...
40 CFR 270.25 - Specific part B information requirements for equipment.
Code of Federal Regulations, 2012 CFR
2012-07-01
... characteristics and control device operation parameters as specified in § 264.1035(b)(4)(iii). (4) A statement... Permit Application § 270.25 Specific part B information requirements for equipment. Except as otherwise... implementation schedule as specified in § 264.1033(a)(2). (c) Where an owner or operator applies for permission...
40 CFR 270.25 - Specific part B information requirements for equipment.
Code of Federal Regulations, 2014 CFR
2014-07-01
... characteristics and control device operation parameters as specified in § 264.1035(b)(4)(iii). (4) A statement... Permit Application § 270.25 Specific part B information requirements for equipment. Except as otherwise... implementation schedule as specified in § 264.1033(a)(2). (c) Where an owner or operator applies for permission...
40 CFR 265.1064 - Recordkeeping requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
...). (iii) Type of equipment (e.g., a pump or pipeline valve). (iv) Percent-by-weight total organics in the...)(2), an implementation schedule as specified in § 265.1033(a)(2). (3) Where an owner or operator... concentration achieved by the control device, a performance test plan as specified in § 265.1035(b)(3). (4...
40 CFR 264.1064 - Recordkeeping requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... facility (e.g., identify the hazardous waste management unit on a facility plot plan). (iii) Type of... schedule as specified in § 264.1033(a)(2). (3) Where an owner or operator chooses to use test data to... device, a performance test plan as specified in § 264.1035(b)(3). (4) Documentation of compliance with...
40 CFR 264.1064 - Recordkeeping requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... facility (e.g., identify the hazardous waste management unit on a facility plot plan). (iii) Type of... schedule as specified in § 264.1033(a)(2). (3) Where an owner or operator chooses to use test data to... device, a performance test plan as specified in § 264.1035(b)(3). (4) Documentation of compliance with...
40 CFR 264.1064 - Recordkeeping requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... facility (e.g., identify the hazardous waste management unit on a facility plot plan). (iii) Type of... schedule as specified in § 264.1033(a)(2). (3) Where an owner or operator chooses to use test data to... device, a performance test plan as specified in § 264.1035(b)(3). (4) Documentation of compliance with...
40 CFR 264.1064 - Recordkeeping requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... facility (e.g., identify the hazardous waste management unit on a facility plot plan). (iii) Type of... schedule as specified in § 264.1033(a)(2). (3) Where an owner or operator chooses to use test data to... device, a performance test plan as specified in § 264.1035(b)(3). (4) Documentation of compliance with...
40 CFR 270.25 - Specific part B information requirements for equipment.
Code of Federal Regulations, 2013 CFR
2013-07-01
... characteristics and control device operation parameters as specified in § 264.1035(b)(4)(iii). (4) A statement... Permit Application § 270.25 Specific part B information requirements for equipment. Except as otherwise... implementation schedule as specified in § 264.1033(a)(2). (c) Where an owner or operator applies for permission...
18 CFR 1302.7 - Compliance reviews and conduct of investigations.
Code of Federal Regulations, 2010 CFR
2010-04-01
... to take necessary specified steps within a stated period of time to come into compliance with Title... affected by the review; (iii) The opportunity to make, at any time prior to receipt of the final TVA... schedule under which the review will be conducted and a determination of compliance or noncompliance made...
75 FR 62377 - Combined Notice of Filings #3
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-08
.... Eastern Time on Monday, October 18, 2010. Docket Numbers: ER10-2943-000. Applicants: Smart One Energy, LLC. Description: Smart One Energy, LLC submits Petition for Acceptance of Initial Tariff, Waivers, and Blanket...)(2)(iii): FERC Rate Schedule No. 51, City of Tipp City to be effective 9/29/2010. Filed Date: 09/29...
13 CFR 307.16 - Effective utilization of Revolving Loan Funds.
Code of Federal Regulations, 2010 CFR
2010-01-01
... the prescribed lending schedule, EDA may de-obligate the non-disbursed balance of the RLF Grant. EDA... control of the RLF Recipient; (ii) The financial need for the RLF still exists; (iii) The current and... loaned. (2) When the percentage of loaned RLF Capital falls below the applicable capital utilization...
78 FR 61448 - Proposed Collection; Comment Request for Forms 1120-L and SCHM-3
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-03
... statements and reconciles financial statement net income (loss) for the corporation (or consolidated financial statement group, if applicable), to net income (loss) of the corporation for U.S. taxable income purposes. Schedule M-3, Parts II and III, reconcile financial statement net income (loss) for the U.S...
Psychiatric comorbidity in DSM-III-R hypochondriasis.
Barsky, A J; Wyshak, G; Klerman, G L
1992-02-01
Forty-two DSM-III-R hypochondriacs from a general medical clinic were compared with a random sample of 76 outpatients from the same setting. Patients completed a research battery that included a structured diagnostic interview (Diagnostic Interview Schedule) and self-report questionnaires to measure personality disorder caseness, functional impairment, and hypochondriacal symptoms. Psychiatric morbidity in the hypochondriacal sample significantly exceeded that of the comparison sample. Hypochondriacs had twice as many lifetime Axis I diagnoses, twice as many Diagnostic Interview Schedule symptoms, and three times the level of personality disorder caseness as the comparison group. Of the hypochondriacal sample, 88% had one or more additional Axis I disorders, the overlap being greatest with depressive and anxiety disorders. One fifth of the hypochondriacs had somatization disorder, but the two conditions appeared to be phenomenologically distinct. Hypochondriacal patients with coexisting anxiety and/or depressive disorder (secondary hypochondriasis) did not differ greatly from hypochondriacal patients without these comorbid conditions (primary hypochondriasis). Because the nature of hypochondriasis remains unclear and requires further study, we suggest that its nosologic status not be altered in DSM-IV.
Gerretsen, Philip; Takeuchi, Hiroyoshi; Ozzoude, Miracle; Graff-Guerrero, Ariel; Uchida, Hiroyuki
2017-05-01
Little is known about the influence of D 2 receptor occupancy on impaired insight into illness (III)-a core feature of schizophrenia. III is associated with illness severity and cognitive dysfunction. Comparably, supratherapeutic D 2 receptor occupancy can impair cognition. However, it is unclear how illness severity, cognition, and D 2 receptor occupancy interact to influence III in schizophrenia. The aim of this study was to explore the influence of antipsychotic dose reduction on the relationships of illness severity and cognition to III. III was assessed at baseline and 28 weeks post-antipsychotic dose reduction in 16 participants with schizophrenia and plasma antipsychotic concentrations. III was assessed primarily with the Schedule for the Assessment of Insight-Japanese version, and secondarily with the Positive and Negative Syndrome Scale item G12. Correlation and regression analyses were performed to explore III's relationship to illness severity, cognition, and estimated D 2 receptor occupancy (Est.D 2 ). Cognition and Est.D 2 predicted III at baseline. At 28 weeks post-reduction, illness severity and Est.D 2 predicted III. Our findings suggest a complex relationship may exist among III, illness severity, cognition and Est.D 2 . At higher D 2 receptor occupancies, III is influenced by cognitive dysfunction, whereas, at lower occupancies, illness severity has a stronger effect on III. Copyright © 2017 Elsevier Ireland Ltd. All rights reserved.
Scheduling algorithms for rapid imaging using agile Cubesat constellations
NASA Astrophysics Data System (ADS)
Nag, Sreeja; Li, Alan S.; Merrick, James H.
2018-02-01
Distributed Space Missions such as formation flight and constellations, are being recognized as important Earth Observation solutions to increase measurement samples over space and time. Cubesats are increasing in size (27U, ∼40 kg in development) with increasing capabilities to host imager payloads. Given the precise attitude control systems emerging in the commercial market, Cubesats now have the ability to slew and capture images within short notice. We propose a modular framework that combines orbital mechanics, attitude control and scheduling optimization to plan the time-varying, full-body orientation of agile Cubesats in a constellation such that they maximize the number of observed images and observation time, within the constraints of Cubesat hardware specifications. The attitude control strategy combines bang-bang and PD control, with constraints such as power consumption, response time, and stability factored into the optimality computations and a possible extension to PID control to account for disturbances. Schedule optimization is performed using dynamic programming with two levels of heuristics, verified and improved upon using mixed integer linear programming. The automated scheduler is expected to run on ground station resources and the resultant schedules uplinked to the satellites for execution, however it can be adapted for onboard scheduling, contingent on Cubesat hardware and software upgrades. The framework is generalizable over small steerable spacecraft, sensor specifications, imaging objectives and regions of interest, and is demonstrated using multiple 20 kg satellites in Low Earth Orbit for two case studies - rapid imaging of Landsat's land and coastal images and extended imaging of global, warm water coral reefs. The proposed algorithm captures up to 161% more Landsat images than nadir-pointing sensors with the same field of view, on a 2-satellite constellation over a 12-h simulation. Integer programming was able to verify that optimality of the dynamic programming solution for single satellites was within 10%, and find up to 5% more optimal solutions. The optimality gap for constellations was found to be 22% at worst, but the dynamic programming schedules were found at nearly four orders of magnitude better computational speed than integer programming. The algorithm can include cloud cover predictions, ground downlink windows or any other spatial, temporal or angular constraints into the orbital module and be integrated into planning tools for agile constellations.
40 CFR 52.1771 - Classification of regions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 4 2013-07-01 2013-07-01 false Classification of regions. 52.1771 Section 52.1771 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... III III III III Eastern Piedmont Intrastate I III III III III Northern Coastal Intrastate I III III...
40 CFR 52.1771 - Classification of regions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 4 2014-07-01 2014-07-01 false Classification of regions. 52.1771 Section 52.1771 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... III III III III Eastern Piedmont Intrastate I III III III III Northern Coastal Intrastate I III III...
40 CFR 52.1771 - Classification of regions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Classification of regions. 52.1771 Section 52.1771 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... III III III III Eastern Piedmont Intrastate I III III III III Northern Coastal Intrastate I III III...
40 CFR 52.1771 - Classification of regions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Classification of regions. 52.1771 Section 52.1771 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... III III III III Eastern Piedmont Intrastate I III III III III Northern Coastal Intrastate I III III...
40 CFR 52.1771 - Classification of regions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 4 2012-07-01 2012-07-01 false Classification of regions. 52.1771 Section 52.1771 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... III III III III Eastern Piedmont Intrastate I III III III III Northern Coastal Intrastate I III III...
NASA Technical Reports Server (NTRS)
Hornstein, Rhoda S.; Shinkle, Gerald L.; Weiler, Jerry D.; Willoughby, John K.
1990-01-01
This paper presents a planning approach to the Space Station Freedom program which takes into account the widely distributed nature of that program. The program management structure is organized into three major levels: a strategic level, a tactical level, and an execution level. For each level, resource availabilities are determined, the resources are distributed, schedules are built independently within the resource limits, the schedules are integrated into a single schedule, and conflicts are resolved by negotiating requirements and/or relaxing contraints. This approach distributes resources to multiple planning entities in such a way that when the multiple plans are collected, they fit together with minimal modification. The up-front distribution is planned in such a way and to a sufficient degree that a fit is virtually assured.
NASA Technical Reports Server (NTRS)
Dupnick, E.; Wiggins, D.
1980-01-01
The functional specifications, functional design and flow, and the program logic of the GREEDY computer program are described. The GREEDY program is a submodule of the Scheduling Algorithm for Mission Planning and Logistics Evaluation (SAMPLE) program and has been designed as a continuation of the shuttle Mission Payloads (MPLS) program. The MPLS uses input payload data to form a set of feasible payload combinations; from these, GREEDY selects a subset of combinations (a traffic model) so all payloads can be included without redundancy. The program also provides the user a tutorial option so that he can choose an alternate traffic model in case a particular traffic model is unacceptable.
Preflight and In-Flight Exercise Conditions for Astronauts on the International Space Station
NASA Technical Reports Server (NTRS)
Guilliams, Mark E.; Nieschwitz, Bruce; Hoellen, David; Loehr, Jim
2011-01-01
The physiological demands of spaceflight require astronauts to have certain physical abilities. They must be able to perform routine and off-nominal physical work during flight and upon re-entry into a gravity environment to ensure mission success, such as an Extra Vehicular Activity (EVA) or emergency egress. To prepare the astronauts for their mission, a Wyle Astronaut Strength Conditioning and Rehabilitation specialist (ASCR) works individually with the astronauts to prescribe preflight strength and conditioning programs and in-flight exercise, utilizing Countermeasure Systems (CMS) exercise hardware. PURPOSE: To describe the preflight and in-flight exercise programs for ISS crewmembers. METHODS: Approximately 2 years before a scheduled launch, an ASCR is assigned to each astronaut and physical training (PT) is routinely scheduled. Preflight PT of astronauts consists of carrying out strength, aerobic and general conditioning, employing the principles of periodization. Exercise programs are prescribed to the astronauts to account for their individual fitness levels, planned mission-specific tasks, areas of concern, and travel schedules. Additionally, astronauts receive instruction on how to operate CMS exercise hardware and receive training for microgravity-specific conditions. For example, astronauts are scheduled training sessions for the International Space Station (ISS) treadmill (TVIS) and cycle ergometer (CEVIS), as well as the Advanced Resistive Exercise Device (ARED). In-flight programs are designed to maintain or even improve the astronauts pre-flight levels of fitness, bone health, muscle strength, power and aerobic capacity. In-flight countermeasure sessions are scheduled in 2.5 h blocks, six days a week, which includes 1.5 h for resistive training and 1 h for aerobic exercise. CONCLUSIONS: Crewmembers reported the need for more scheduled time for preflight training. During flight, crewmembers have indicated that the in-flight exercise is sufficient, but would like more reliable and capable hardware.
Bulk Leisure--Problem or Blessing?
ERIC Educational Resources Information Center
Beland, Robert M.
1983-01-01
With an increasing number of the nation's work force experiencing "bulk leisure" time because of new work scheduling procedures, parks and recreation offices are encouraged to examine their program scheduling and content. (JM)
Test-retest reliability of a standardized psychiatric interview (DIS/CIDI).
Semler, G; Wittchen, H U; Joschke, K; Zaudig, M; von Geiso, T; Kaiser, S; von Cranach, M; Pfister, H
1987-01-01
The reliability of DSM-III diagnoses using an expanded version of the Diagnostic Interview Schedule (DIS), called the Composite International Diagnostic Interview (CIDI), was evaluated by examining 60 psychiatric inpatients on a test-retest basis. Acceptable agreement coefficients of (kappa) 0.5 or above were found for all but two disorders: dysthymic disorder and generalized anxiety disorder. The subclassification of DSM-III affective disorders also revealed some discrepancies between the test and the retest interviews. When compared with results from earlier versions of the DIS, diagnostic reliability was found to have improved for the DSM-III anxiety disorders in particular. These improvements can possibly be attributed to some changes in the wording of the respective items of this section. Several reasons for lowered test-retest reliability are discussed.
This booklet, ETV Program Case Studies: Demonstrating Program Outcomes, Volume III contains two case studies, addressing verified environmental technologies for decentalized wastewater treatment and converting animal waste to energy. Each case study contains a brief description ...
A Dynamic Scheduling Method of Earth-Observing Satellites by Employing Rolling Horizon Strategy
Dishan, Qiu; Chuan, He; Jin, Liu; Manhao, Ma
2013-01-01
Focused on the dynamic scheduling problem for earth-observing satellites (EOS), an integer programming model is constructed after analyzing the main constraints. The rolling horizon (RH) strategy is proposed according to the independent arriving time and deadline of the imaging tasks. This strategy is designed with a mixed triggering mode composed of periodical triggering and event triggering, and the scheduling horizon is decomposed into a series of static scheduling intervals. By optimizing the scheduling schemes in each interval, the dynamic scheduling of EOS is realized. We also propose three dynamic scheduling algorithms by the combination of the RH strategy and various heuristic algorithms. Finally, the scheduling results of different algorithms are compared and the presented methods in this paper are demonstrated to be efficient by extensive experiments. PMID:23690742
A dynamic scheduling method of Earth-observing satellites by employing rolling horizon strategy.
Dishan, Qiu; Chuan, He; Jin, Liu; Manhao, Ma
2013-01-01
Focused on the dynamic scheduling problem for earth-observing satellites (EOS), an integer programming model is constructed after analyzing the main constraints. The rolling horizon (RH) strategy is proposed according to the independent arriving time and deadline of the imaging tasks. This strategy is designed with a mixed triggering mode composed of periodical triggering and event triggering, and the scheduling horizon is decomposed into a series of static scheduling intervals. By optimizing the scheduling schemes in each interval, the dynamic scheduling of EOS is realized. We also propose three dynamic scheduling algorithms by the combination of the RH strategy and various heuristic algorithms. Finally, the scheduling results of different algorithms are compared and the presented methods in this paper are demonstrated to be efficient by extensive experiments.
Conflicts of Time: Examining School Schedules in Secondary Agricultural Programs
ERIC Educational Resources Information Center
Epps, Rebekah B.; Adams, Randy J.; Vincent, Stacy K.
2015-01-01
The purpose of this study was to examine how school schedules can or cannot be justified through the perspective of student performance on state core content assessments and occupational skills standards assessments. This study utilized the Theory of Power in Education when considering school schedules as a means to student success on core content…
NASA Technical Reports Server (NTRS)
Frassinelli, G. J.
1972-01-01
Cost estimates and funding schedules are presented for a given configuration and costing ground rules. Cost methodology is described and the cost evolution from a baseline configuration to a selected configuration is given, emphasizing cases in which cost was a design driver. Programmatic cost avoidance techniques are discussed.
1993-09-01
goal ( Heizer , Render , and Stair, 1993:94). Integer Prgronmming. Integer programming is a general purpose approach used to optimally solve job shop...Scheduling," Operations Research Journal. 29, No 4: 646-667 (July-August 1981). Heizer , Jay, Barry Render and Ralph M. Stair, Jr. Production and Operations
This schedule indicates plans for completion of risk assessments, proposed interim decisions and interim decisions for pesticides in the Registration Review program, EPA reviews all registered pesticides at least every 15 years as required by FIFRA.
Scheduling language and algorithm development study. Appendix: Study approach and activity summary
NASA Technical Reports Server (NTRS)
1974-01-01
The approach and organization of the study to develop a high level computer programming language and a program library are presented. The algorithm and problem modeling analyses are summarized. The approach used to identify and specify the capabilities required in the basic language is described. Results of the analyses used to define specifications for the scheduling module library are presented.
Generation of Look-Up Tables for Dynamic Job Shop Scheduling Decision Support Tool
NASA Astrophysics Data System (ADS)
Oktaviandri, Muchamad; Hassan, Adnan; Mohd Shaharoun, Awaluddin
2016-02-01
Majority of existing scheduling techniques are based on static demand and deterministic processing time, while most job shop scheduling problem are concerned with dynamic demand and stochastic processing time. As a consequence, the solutions obtained from the traditional scheduling technique are ineffective wherever changes occur to the system. Therefore, this research intends to develop a decision support tool (DST) based on promising artificial intelligent that is able to accommodate the dynamics that regularly occur in job shop scheduling problem. The DST was designed through three phases, i.e. (i) the look-up table generation, (ii) inverse model development and (iii) integration of DST components. This paper reports the generation of look-up tables for various scenarios as a part in development of the DST. A discrete event simulation model was used to compare the performance among SPT, EDD, FCFS, S/OPN and Slack rules; the best performances measures (mean flow time, mean tardiness and mean lateness) and the job order requirement (inter-arrival time, due dates tightness and setup time ratio) which were compiled into look-up tables. The well-known 6/6/J/Cmax Problem from Muth and Thompson (1963) was used as a case study. In the future, the performance measure of various scheduling scenarios and the job order requirement will be mapped using ANN inverse model.
Dessole, Salvatore; Cosmi, Erich; Balata, Antonio; Uras, Luisa; Caserta, Donatella; Capobianco, Giampiero; Ambrosini, Guido
2004-11-01
The purpose of this study was to investigate the incidence, type, location, and risk factors of accidental fetal lacerations during cesarean delivery. Total deliveries, cesarean deliveries, and neonatal records for documented accidental fetal lacerations were reviewed retrospectively in our level III university hospital. The gestational age, the presenting part of the fetus, the cesarean delivery indication, the type of incision, and the surgeon who performed the procedure were recorded. Cesarean deliveries were divided into scheduled, unscheduled, and emergency procedures. Fetal lacerations were divided into mild, moderate, and severe. Neonatal follow-up examinations regarding laceration sequelae were available for 6 months. Of 14926 deliveries, 3108 women were delivered by cesarean birth (20.82%). Neonatal records documented 97 accidental fetal lacerations. Of these accidental lacerations, 94 were mild; 2 were moderate, and 1 was severe. The overall rate of accidental fetal laceration per cesarean delivery was 3.12%; the accidental laceration rate in the cohort of fetuses was 2.46%. The crude odds ratios were 0.34 for scheduled procedures, 0.57 for unscheduled procedures, and 1.7 for emergency procedures. The risk for fetal accidental lacerations was higher in fetuses who underwent emergency cesarean birth and lower for unscheduled and scheduled cesarean births (P < .001). Fetal accidental laceration may occur during cesarean delivery; the incidence is significantly higher during emergency cesarean delivery compared with elective procedures. The patient should be counseled about the occurrence of fetal laceration during cesarean delivery to avoid litigation.
Microcomputer Scheduling of Reference Desk Staff.
ERIC Educational Resources Information Center
Cornick, Donna; Owen, Willy
1988-01-01
Presents a model that can accommodate staff preferences when determining a reference desk schedule using a microcomputer, the Lotus 1-2-3 spreadsheet software, and the linear programing software LP83. (eight references) (MES)
Time-based air traffic management using expert systems
NASA Technical Reports Server (NTRS)
Tobias, L.; Scoggins, J. L.
1986-01-01
A prototype expert system has been developed for the time scheduling of aircraft into the terminal area. The three functions of the air-traffic-control schedule advisor are as follows: (1) for each new arrival, it develops an admisible flight plan for that aircraft; (2) as the aircraft progresses through the terminal area, it monitors deviations from the aircraft's flight plan and provides advisories to return the aircraft to its assigned schedule; and (3) if major disruptions such as missed approaches occur, it develops a revised plan. The advisor is operational on a Symbolics 3600, and is programmed in MRS (a logic programming language), Lisp, and Fortran.
Time-based air traffic management using expert systems
NASA Technical Reports Server (NTRS)
Tobias, L.; Scoggins, J. L.
1986-01-01
A prototype expert system was developed for the time scheduling of aircraft into the terminal area. The three functions of the air traffic control schedule advisor are as follows: first, for each new arrival, it develops an admissible flight plan for that aircraft. Second, as the aircraft progresses through the terminal area, it monitors deviations from the flight plan and provides advisories to return the aircraft to its assigned schedule. Third, if major disruptions such as missed approaches occur, it develops a revised plan. The advisor is operational on a Symbolics 3600, and is programed in MRS (a logic programming language), Lisp, and FORTRAN.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-29
...This final rule with comment period addresses changes to the physician fee schedule and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. It finalizes the calendar year (CY) 2010 interim relative value units (RVUs) and issues interim RVUs for new and revised procedure codes for CY 2011. It also addresses, implements, or discusses certain provisions of both the Affordable Care Act (ACA) and the Medicare Improvements for Patients and Providers Act of 2008 (MIPPA). In addition, this final rule with comment period discusses payments under the Ambulance Fee Schedule (AFS), the Ambulatory Surgical Center (ASC) payment system, and the Clinical Laboratory Fee Schedule (CLFS), payments to end-stage renal disease (ESRD) facilities, and payments for Part B drugs. Finally, this final rule with comment period also includes a discussion regarding the Chiropractic Services Demonstration program, the Competitive Bidding Program for durable medical equipment, prosthetics, orthotics, and supplies (CBP DMEPOS), and provider and supplier enrollment issues associated with air ambulances.
Shift scheduling model considering workload and worker’s preference for security department
NASA Astrophysics Data System (ADS)
Herawati, A.; Yuniartha, D. R.; Purnama, I. L. I.; Dewi, LT
2018-04-01
Security department operates for 24 hours and applies shift scheduling to organize its workers as well as in hotel industry. This research has been conducted to develop shift scheduling model considering the workers physical workload using rating of perceived exertion (RPE) Borg’s Scale and workers’ preference to accommodate schedule flexibility. The mathematic model is developed in integer linear programming and results optimal solution for simple problem. Resulting shift schedule of the developed model has equally distribution shift allocation among workers to balance the physical workload and give flexibility for workers in working hours arrangement.
Cost-Effectiveness Analysis of the Spanish Renal Replacement Therapy Program
Villa, Guillermo; Fernández–Ortiz, Lucía; Cuervo, Jesús; Rebollo, Pablo; Selgas, Rafael; González, Teresa; Arrieta, Javier
2012-01-01
♦ Background: We undertook a cost-effectiveness analysis of the Spanish Renal Replacement Therapy (RRT) program for end-stage renal disease patients from a societal perspective. The current Spanish situation was compared with several hypothetical scenarios. ♦ Methods: A Markov chain model was used as a foundation for simulations of the Spanish RRT program in three temporal horizons (5, 10, and 15 years). The current situation (scenario 1) was compared with three different scenarios: increased proportion of overall scheduled (planned) incident patients (scenario 2); constant proportion of overall scheduled incident patients, but increased proportion of scheduled incident patients on peritoneal dialysis (PD), resulting in a lower proportion of scheduled incident patients on hemodialysis (HD) (scenario 3); and increased overall proportion of scheduled incident patients together with increased scheduled incidence of patients on PD (scenario 4). ♦ Results: The incremental cost-effectiveness ratios (ICERs) of scenarios 2, 3, and 4, when compared with scenario 1, were estimated to be, respectively, –€83 150, –€354 977, and –€235 886 per incremental quality-adjusted life year (ΔQALY), evidencing both moderate cost savings and slight effectiveness gains. The net health benefits that would accrue to society were estimated to be, respectively, 0.0045, 0.0211, and 0.0219 ΔQALYs considering a willingness-to-pay threshold of €35 000/ΔQALY. ♦ Conclusions: Scenario 1, the current Spanish situation, was dominated by all the proposed scenarios. Interestingly, scenarios 3 and 4 showed the best results in terms of cost-effectiveness. From a cost-effectiveness perspective, an increase in the overall scheduled incidence of RRT, and particularly that of PD, should be promoted. PMID:21965620
Advanced Technology System Scheduling Governance Model
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ang, Jim; Carnes, Brian; Hoang, Thuc
In the fall of 2005, the Advanced Simulation and Computing (ASC) Program appointed a team to formulate a governance model for allocating resources and scheduling the stockpile stewardship workload on ASC capability systems. This update to the original document takes into account the new technical challenges and roles for advanced technology (AT) systems and the new ASC Program workload categories that must be supported. The goal of this updated model is to effectively allocate and schedule AT computing resources among all three National Nuclear Security Administration (NNSA) laboratories for weapons deliverables that merit priority on this class of resource. Themore » process outlined below describes how proposed work can be evaluated and approved for resource allocations while preserving high effective utilization of the systems. This approach will provide the broadest possible benefit to the Stockpile Stewardship Program (SSP).« less
NASA Astrophysics Data System (ADS)
Albareti, Franco D.; Allende Prieto, Carlos; Almeida, Andres; Anders, Friedrich; Anderson, Scott; Andrews, Brett H.; Aragón-Salamanca, Alfonso; Argudo-Fernández, Maria; Armengaud, Eric; Aubourg, Eric; Avila-Reese, Vladimir; Badenes, Carles; Bailey, Stephen; Barbuy, Beatriz; Barger, Kat; Barrera-Ballesteros, Jorge; Bartosz, Curtis; Basu, Sarbani; Bates, Dominic; Battaglia, Giuseppina; Baumgarten, Falk; Baur, Julien; Bautista, Julian; Beers, Timothy C.; Belfiore, Francesco; Bershady, Matthew; Bertran de Lis, Sara; Bird, Jonathan C.; Bizyaev, Dmitry; Blanc, Guillermo A.; Blanton, Michael; Blomqvist, Michael; Bolton, Adam S.; Borissova, J.; Bovy, Jo; Nielsen Brandt, William; Brinkmann, Jonathan; Brownstein, Joel R.; Bundy, Kevin; Burtin, Etienne; Busca, Nicolás G.; Orlando Camacho Chavez, Hugo; Cano Díaz, M.; Cappellari, Michele; Carrera, Ricardo; Chen, Yanping; Cherinka, Brian; Cheung, Edmond; Chiappini, Cristina; Chojnowski, Drew; Chuang, Chia-Hsun; Chung, Haeun; Cirolini, Rafael Fernando; Clerc, Nicolas; Cohen, Roger E.; Comerford, Julia M.; Comparat, Johan; Correa do Nascimento, Janaina; Cousinou, Marie-Claude; Covey, Kevin; Crane, Jeffrey D.; Croft, Rupert; Cunha, Katia; Darling, Jeremy; Davidson, James W., Jr.; Dawson, Kyle; Da Costa, Luiz; Da Silva Ilha, Gabriele; Deconto Machado, Alice; Delubac, Timothée; De Lee, Nathan; De la Macorra, Axel; De la Torre, Sylvain; Diamond-Stanic, Aleksandar M.; Donor, John; Downes, Juan Jose; Drory, Niv; Du, Cheng; Du Mas des Bourboux, Hélion; Dwelly, Tom; Ebelke, Garrett; Eigenbrot, Arthur; Eisenstein, Daniel J.; Elsworth, Yvonne P.; Emsellem, Eric; Eracleous, Michael; Escoffier, Stephanie; Evans, Michael L.; Falcón-Barroso, Jesús; Fan, Xiaohui; Favole, Ginevra; Fernandez-Alvar, Emma; Fernandez-Trincado, J. G.; Feuillet, Diane; Fleming, Scott W.; Font-Ribera, Andreu; Freischlad, Gordon; Frinchaboy, Peter; Fu, Hai; Gao, Yang; Garcia, Rafael A.; Garcia-Dias, R.; Garcia-Hernández, D. A.; Garcia Pérez, Ana E.; Gaulme, Patrick; Ge, Junqiang; Geisler, Douglas; Gillespie, Bruce; Gil Marin, Hector; Girardi, Léo; Goddard, Daniel; Gomez Maqueo Chew, Yilen; Gonzalez-Perez, Violeta; Grabowski, Kathleen; Green, Paul; Grier, Catherine J.; Grier, Thomas; Guo, Hong; Guy, Julien; Hagen, Alex; Hall, Matt; Harding, Paul; Harley, R. E.; Hasselquist, Sten; Hawley, Suzanne; Hayes, Christian R.; Hearty, Fred; Hekker, Saskia; Hernandez Toledo, Hector; Ho, Shirley; Hogg, David W.; Holley-Bockelmann, Kelly; Holtzman, Jon A.; Holzer, Parker H.; Hu, Jian; Huber, Daniel; Hutchinson, Timothy Alan; Hwang, Ho Seong; Ibarra-Medel, Héctor J.; Ivans, Inese I.; Ivory, KeShawn; Jaehnig, Kurt; Jensen, Trey W.; Johnson, Jennifer A.; Jones, Amy; Jullo, Eric; Kallinger, T.; Kinemuchi, Karen; Kirkby, David; Klaene, Mark; Kneib, Jean-Paul; Kollmeier, Juna A.; Lacerna, Ivan; Lane, Richard R.; Lang, Dustin; Laurent, Pierre; Law, David R.; Leauthaud, Alexie; Le Goff, Jean-Marc; Li, Chen; Li, Cheng; Li, Niu; Li, Ran; Liang, Fu-Heng; Liang, Yu; Lima, Marcos; Lin, Lihwai; Lin, Lin; Lin, Yen-Ting; Liu, Chao; Long, Dan; Lucatello, Sara; MacDonald, Nicholas; MacLeod, Chelsea L.; Mackereth, J. Ted; Mahadevan, Suvrath; Geimba Maia, Marcio Antonio; Maiolino, Roberto; Majewski, Steven R.; Malanushenko, Olena; Malanushenko, Viktor; Dullius Mallmann, Nícolas; Manchado, Arturo; Maraston, Claudia; Marques-Chaves, Rui; Martinez Valpuesta, Inma; Masters, Karen L.; Mathur, Savita; McGreer, Ian D.; Merloni, Andrea; Merrifield, Michael R.; Meszáros, Szabolcs; Meza, Andres; Miglio, Andrea; Minchev, Ivan; Molaverdikhani, Karan; Montero-Dorta, Antonio D.; Mosser, Benoit; Muna, Demitri; Myers, Adam; Nair, Preethi; Nandra, Kirpal; Ness, Melissa; Newman, Jeffrey A.; Nichol, Robert C.; Nidever, David L.; Nitschelm, Christian; O’Connell, Julia; Oravetz, Audrey; Oravetz, Daniel J.; Pace, Zachary; Padilla, Nelson; Palanque-Delabrouille, Nathalie; Pan, Kaike; Parejko, John; Paris, Isabelle; Park, Changbom; Peacock, John A.; Peirani, Sebastien; Pellejero-Ibanez, Marcos; Penny, Samantha; Percival, Will J.; Percival, Jeffrey W.; Perez-Fournon, Ismael; Petitjean, Patrick; Pieri, Matthew; Pinsonneault, Marc H.; Pisani, Alice; Prada, Francisco; Prakash, Abhishek; Price-Jones, Natalie; Raddick, M. Jordan; Rahman, Mubdi; Raichoor, Anand; Barboza Rembold, Sandro; Reyna, A. M.; Rich, James; Richstein, Hannah; Ridl, Jethro; Riffel, Rogemar A.; Riffel, Rogério; Rix, Hans-Walter; Robin, Annie C.; Rockosi, Constance M.; Rodríguez-Torres, Sergio; Rodrigues, Thaíse S.; Roe, Natalie; Lopes, A. Roman; Román-Zúñiga, Carlos; Ross, Ashley J.; Rossi, Graziano; Ruan, John; Ruggeri, Rossana; Runnoe, Jessie C.; Salazar-Albornoz, Salvador; Salvato, Mara; Sanchez, Sebastian F.; Sanchez, Ariel G.; Sanchez-Gallego, José R.; Santiago, Basílio Xavier; Schiavon, Ricardo; Schimoia, Jaderson S.; Schlafly, Eddie; Schlegel, David J.; Schneider, Donald P.; Schönrich, Ralph; Schultheis, Mathias; Schwope, Axel; Seo, Hee-Jong; Serenelli, Aldo; Sesar, Branimir; Shao, Zhengyi; Shetrone, Matthew; Shull, Michael; Silva Aguirre, Victor; Skrutskie, M. F.; Slosar, Anže; Smith, Michael; Smith, Verne V.; Sobeck, Jennifer; Somers, Garrett; Souto, Diogo; Stark, David V.; Stassun, Keivan G.; Steinmetz, Matthias; Stello, Dennis; Storchi Bergmann, Thaisa; Strauss, Michael A.; Streblyanska, Alina; Stringfellow, Guy S.; Suarez, Genaro; Sun, Jing; Taghizadeh-Popp, Manuchehr; Tang, Baitian; Tao, Charling; Tayar, Jamie; Tembe, Mita; Thomas, Daniel; Tinker, Jeremy; Tojeiro, Rita; Tremonti, Christy; Troup, Nicholas; Trump, Jonathan R.; Unda-Sanzana, Eduardo; Valenzuela, O.; Van den Bosch, Remco; Vargas-Magaña, Mariana; Vazquez, Jose Alberto; Villanova, Sandro; Vivek, M.; Vogt, Nicole; Wake, David; Walterbos, Rene; Wang, Yuting; Wang, Enci; Weaver, Benjamin Alan; Weijmans, Anne-Marie; Weinberg, David H.; Westfall, Kyle B.; Whelan, David G.; Wilcots, Eric; Wild, Vivienne; Williams, Rob A.; Wilson, John; Wood-Vasey, W. M.; Wylezalek, Dominika; Xiao, Ting; Yan, Renbin; Yang, Meng; Ybarra, Jason E.; Yeche, Christophe; Yuan, Fang-Ting; Zakamska, Nadia; Zamora, Olga; Zasowski, Gail; Zhang, Kai; Zhao, Cheng; Zhao, Gong-Bo; Zheng, Zheng; Zheng, Zheng; Zhou, Zhi-Min; Zhu, Guangtun; Zinn, Joel C.; Zou, Hu
2017-12-01
The fourth generation of the Sloan Digital Sky Survey (SDSS-IV) began observations in 2014 July. It pursues three core programs: the Apache Point Observatory Galactic Evolution Experiment 2 (APOGEE-2), Mapping Nearby Galaxies at APO (MaNGA), and the Extended Baryon Oscillation Spectroscopic Survey (eBOSS). As well as its core program, eBOSS contains two major subprograms: the Time Domain Spectroscopic Survey (TDSS) and the SPectroscopic IDentification of ERosita Sources (SPIDERS). This paper describes the first data release from SDSS-IV, Data Release 13 (DR13). DR13 makes publicly available the first 1390 spatially resolved integral field unit observations of nearby galaxies from MaNGA. It includes new observations from eBOSS, completing the Sloan Extended QUasar, Emission-line galaxy, Luminous red galaxy Survey (SEQUELS), which also targeted variability-selected objects and X-ray-selected objects. DR13 includes new reductions of the SDSS-III BOSS data, improving the spectrophotometric calibration and redshift classification, and new reductions of the SDSS-III APOGEE-1 data, improving stellar parameters for dwarf stars and cooler stars. DR13 provides more robust and precise photometric calibrations. Value-added target catalogs relevant for eBOSS, TDSS, and SPIDERS and an updated red-clump catalog for APOGEE are also available. This paper describes the location and format of the data and provides references to important technical papers. The SDSS web site, http://www.sdss.org, provides links to the data, tutorials, examples of data access, and extensive documentation of the reduction and analysis procedures. DR13 is the first of a scheduled set that will contain new data and analyses from the planned ∼6 yr operations of SDSS-IV.
Comparison of Three Quality of Life Instruments in Lymphatic Filariasis: DLQI, WHODAS 2.0, and LFSQQ
Thomas, Cristina; Narahari, Saravu R.; Bose, Kuthaje S.; Vivekananda, Kuthaje; Nwe, Steven; West, Dennis P.; Kwasny, Mary; Kundu, Roopal V.
2014-01-01
Background The Global Program to Eliminate Lymphatic Filariasis aims to interrupt transmission of lymphatic filariasis and manage morbidity in people currently living with the disease. A component of morbidity management is improving health-related quality of life (HRQoL) in patients. Measurement of HRQoL in current management programs is varied because of the lack of a standard HRQoL tool for use in the lymphatic filariasis population. Methodology/Principal Findings In this study, the psychometric properties of three health status measures were compared when used in a group of lymphatic filariasis patients and healthy controls. The World Health Organization Disability Assessment Schedule 2.0 (WHODAS 2.0), the Dermatology Life Quality Index (DLQI), and the Lymphatic Filariasis Quality of Life Questionnaire (LFSQQ) were administered to 36 stage II and stage III lymphatic filariasis subjects and 36 age and sex matched controls in Kerala, India. All three tools yielded missing value rates lower than 10%, suggesting high feasibility. Highest internal consistency was seen in the LFSQQ (α = 0.97). Discriminant validity analysis demonstrated that HRQoL was significantly lower in the LF group than in controls for the WHODAS 2.0, DLQI, and LFSQQ, but total HRQoL scores did not differ between stage II and stage III lymphedema subjects. The LFSQQ total score correlated most strongly with the WHODAS 2.0 (r = 0.91, p<0.001) and DLQI (r = 0.81, p<0.001). Conclusions/Significance The WHODAS 2.0, DLQI, and LFSQQ demonstrate acceptable feasibility, internal consistency, discriminate validity, and construct validity. Based on our psychometric analyses, the LFSQQ performs the best and is recommended for use in the lymphatic filariasis population. PMID:24587467
Production Planning and Planting Pattern Scheduling Information System for Horticulture
NASA Astrophysics Data System (ADS)
Vitadiar, Tanhella Zein; Farikhin; Surarso, Bayu
2018-02-01
This paper present the production of planning and planting pattern scheduling faced by horticulture farmer using two methods. Fuzzy time series method use to predict demand on based on sales amount, while linear programming is used to assist horticulture farmers in making production planning decisions and determining the schedule of cropping patterns in accordance with demand predictions of the fuzzy time series method, variable use in this paper is size of areas, production advantage, amount of seeds and age of the plants. This research result production planning and planting patterns scheduling information system with the output is recommendations planting schedule, harvest schedule and the number of seeds will be plant.
49 CFR Appendix A to Part 239 - Schedule of Civil Penalties 1
Code of Federal Regulations, 2011 CFR
2011-10-01
... emergency responders to participate in emergency simulations 3,000 6,000 (iii) Distribution of applicable... awareness information 3,500 7,000 239.103Failure to conduct a required full-scale simulation in accordance... debriefing and critique session after an emergency or full-scale simulation 4,000 7,500 (d)(1) Failure to...
49 CFR Appendix A to Part 239 - Schedule of Civil Penalties 1
Code of Federal Regulations, 2012 CFR
2012-10-01
... emergency responders to participate in emergency simulations 3,000 6,000 (iii) Distribution of applicable... awareness information 3,500 7,000 239.103Failure to conduct a required full-scale simulation in accordance... debriefing and critique session after an emergency or full-scale simulation 4,000 7,500 (d)(1) Failure to...
49 CFR Appendix A to Part 239 - Schedule of Civil Penalties 1
Code of Federal Regulations, 2014 CFR
2014-10-01
... emergency responders to participate in emergency simulations 3,000 6,000 (iii) Distribution of applicable... passengers with disabilities 2,500 5,000 239.103Failure to conduct a required full-scale simulation in... debriefing and critique session after an emergency or full-scale simulation 4,000 7,500 (c) Failure to design...
49 CFR Appendix A to Part 239 - Schedule of Civil Penalties 1
Code of Federal Regulations, 2010 CFR
2010-10-01
... emergency responders to participate in emergency simulations 3,000 6,000 (iii) Distribution of applicable... awareness information 3,500 7,000 239.103Failure to conduct a required full-scale simulation in accordance... debriefing and critique session after an emergency or full-scale simulation 4,000 7,500 (d)(1) Failure to...
49 CFR Appendix A to Part 239 - Schedule of Civil Penalties 1
Code of Federal Regulations, 2013 CFR
2013-10-01
... emergency responders to participate in emergency simulations 3,000 6,000 (iii) Distribution of applicable... awareness information 3,500 7,000 239.103Failure to conduct a required full-scale simulation in accordance... debriefing and critique session after an emergency or full-scale simulation 4,000 7,500 (d)(1) Failure to...
Code of Federal Regulations, 2014 CFR
2014-01-01
... air test pressure and to assure they will be subjected to the post accident differential pressure... Table of Contents I. Introduction. II. Explanation of terms. III. Leakage test requirements. A. Type A test. B. Type B test. C. Type C test. D. Periodic retest schedule. IV. Special test requirements. A...
Code of Federal Regulations, 2012 CFR
2012-01-01
... air test pressure and to assure they will be subjected to the post accident differential pressure... Table of Contents I. Introduction. II. Explanation of terms. III. Leakage test requirements. A. Type A test. B. Type B test. C. Type C test. D. Periodic retest schedule. IV. Special test requirements. A...
Code of Federal Regulations, 2010 CFR
2010-01-01
... air test pressure and to assure they will be subjected to the post accident differential pressure... Table of Contents I. Introduction. II. Explanation of terms. III. Leakage test requirements. A. Type A test. B. Type B test. C. Type C test. D. Periodic retest schedule. IV. Special test requirements. A...
Code of Federal Regulations, 2013 CFR
2013-01-01
... air test pressure and to assure they will be subjected to the post accident differential pressure... Table of Contents I. Introduction. II. Explanation of terms. III. Leakage test requirements. A. Type A test. B. Type B test. C. Type C test. D. Periodic retest schedule. IV. Special test requirements. A...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-06
... pharmacist who fills the prescription.'' 21 CFR 1306.04(a). Accordingly, the practitioner must determine that... prescription.'' 21 U.S.C. 829(b). DEA regulations further specify that a pharmacist may dispense a Schedule III... made by an individual practitioner and promptly reduced to writing by the pharmacist containing all...
77 FR 16827 - Combined Notice of Filings #2
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-22
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings 2 Take notice... to be effective 2/28/2012. Filed Date: 3/15/12. Accession Number: 20120315-5089. Comments Due: 5 p.m..., Inc. submits tariff filing per 35.13(a)(2)(iii: 03-15-12 Schedule 20 to be effective 5/15/2012. Filed...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-24
...-Settled Foreign Currency Option Fees, in Section III of the Fee Schedule, with Singly Listed Options \\3...\\. The Exchange currently assesses fees for sector index options and U.S. Dollar-Settled foreign currency... U.S. Dollar-Settled Foreign Currency Option Fees.'' \\4\\ BKX represents the KBW Bank Index. \\5\\ RUT...
Code of Federal Regulations, 2013 CFR
2013-04-01
... limited to software, files, data, and prize schedules. (2) Downloads must use secure methodologies that... date of the completion of the download; (iii) The Class II gaming system components to which software was downloaded; (iv) The version(s) of download package and any software downloaded. Logging of the...
Code of Federal Regulations, 2014 CFR
2014-04-01
... limited to software, files, data, and prize schedules. (2) Downloads must use secure methodologies that... date of the completion of the download; (iii) The Class II gaming system components to which software was downloaded; (iv) The version(s) of download package and any software downloaded. Logging of the...
77 FR 64128 - Jose Gonzalo Zavaleta, M.D.; Denial of Application
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-18
... legitimate medical purpose in violation of 21 U.S.C. Sec. 841(a)(1),'' including a total of 75 dosage units of hydrocodone (including Lortab and/or Lorcet), which are schedule III narcotics; 20 dosage units of... Health Care Center, 1217 Willow Glenn River Rd., Alexandria, La. 71302. GX 6, at 1. On his application...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-19
...); (ii) establish a VIX Tier Appointment; (iii) amend the monthly fee for Floor Broker Trading Permits... demutualization, CBOE amended its Fees Schedule to establish Trading Permit, tier appointment and bandwidth packet... permit ($) 1 permit 10 permits 6,000 Tier 1 11 permits 20 permits 4,800 Tier 2 21 or more permits...
Code of Federal Regulations, 2010 CFR
2010-04-01
... practitioner will provide narcotic drugs or combinations of narcotic drugs for appropriate counseling and other... under § 1301.13. (ii) If the individual practitioner is a member of a group practice, the names of the other individual practitioners in the group and the DEA registration numbers issued to the other...
Advanced Clinical Decision Support for Transport of the Critically Ill Patient
2012-10-01
status epilepticus ...2013 Q2 2013 Q3 Status 1 On Schedule 1a...ii. status asthmaticus, iii. sedation and analgesia, iv. mechanical ventilator management for children
14 CFR 211.20 - Initial foreign air carrier permit or transfer of a permit.
Code of Federal Regulations, 2010 CFR
2010-01-01
... the name and official address of the government air transport authority of applicant's country of... property and mail, or a combination; and the type of equipment (and configuration) to be used; and (iii) A service schedule stating the manner in which the service will be operated (e.g., nonstop or multi-stop...
1995-08-03
asked whether the scheduled chemicals will be assigned individual ECCNs . They were interested in whether the normal trade license applications will be...the Australia Group? B-14 AC93MC1002 Has an effort been made or is one planned to coordinate the.trade requirements on these chemicals with the ECCNs
34 CFR 5.60 - Schedule of fees.
Code of Federal Regulations, 2010 CFR
2010-07-01
... rate of pay per hour of the employee conducting the search plus 16 percent of that rate. (iii) Computer... operator plus 16% of that rate plus $287 per hour for computer operation. Two hours of search time on a... of the computer operator's basic rate of pay per hour plus 16 percent of that rate. (2) Review of...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-09
..., contingency measures, and other planning SIPs related to the attainment of either the 1997 annual or 2006 24... contingency measures, with a schedule for implementation, as EPA deems necessary to assure prompt correction... continued attainment; and (5) a contingency plan to prevent or correct future violations of the NAAQS. III...
Parallel scheduling of recursively defined arrays
NASA Technical Reports Server (NTRS)
Myers, T. J.; Gokhale, M. B.
1986-01-01
A new method of automatic generation of concurrent programs which constructs arrays defined by sets of recursive equations is described. It is assumed that the time of computation of an array element is a linear combination of its indices, and integer programming is used to seek a succession of hyperplanes along which array elements can be computed concurrently. The method can be used to schedule equations involving variable length dependency vectors and mutually recursive arrays. Portions of the work reported here have been implemented in the PS automatic program generation system.
NASA management of the Space Shuttle Program
NASA Technical Reports Server (NTRS)
Peters, F.
1975-01-01
The management system and management technology described have been developed to meet stringent cost and schedule constraints of the Space Shuttle Program. Management of resources available to this program requires control and motivation of a large number of efficient creative personnel trained in various technical specialties. This must be done while keeping track of numerous parallel, yet interdependent activities involving different functions, organizations, and products all moving together in accordance with intricate plans for budgets, schedules, performance, and interaction. Some techniques developed to identify problems at an early stage and seek immediate solutions are examined.
The NASA Goddard Group's Source Monitoring Database and Program
NASA Astrophysics Data System (ADS)
Gipson, John; Le Bail, Karine; Ma, Chopo
2014-12-01
Beginning in 2003, the Goddard VLBI group developed a program to purposefully monitor when sources were observed and to increase the observations of ``under-observed'' sources. The heart of the program consists of a MySQL database that keeps track of, on a session-by-session basis: the number of observations that are scheduled for a source, the number of observations that are successfully correlated, and the number of observations that are used in a session. In addition, there is a table that contains the target number of successful sessions over the last twelve months. Initially this table just contained two categories. Sources in the geodetic catalog had a target of 12 sessions/year; the remaining ICRF-1 defining sources had a target of two sessions/year. All other sources did not have a specific target. As the program evolved, different kinds of sources with different observing targets were added. During the scheduling process, the scheduler has the option of automatically selecting N sources which have not met their target. We discuss the history and present some results of this successful program.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-12
...This document corrects technical errors that appeared in the final rule with comment period published in the Federal Register on November 16, 2012, entitled ``Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule, DME Face-to-Face Encounters, Elimination of the Requirement for Termination of Non-Random Prepayment Complex Medical Review and Other Revisions to Part B for CY 2013.''
Cost and schedule analytical techniques development
NASA Technical Reports Server (NTRS)
1994-01-01
This contract provided technical services and products to the Marshall Space Flight Center's Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02) for the period of 3 Aug. 1991 - 30 Nov. 1994. Accomplishments summarized cover the REDSTAR data base, NASCOM hard copy data base, NASCOM automated data base, NASCOM cost model, complexity generators, program planning, schedules, NASA computer connectivity, other analytical techniques, and special project support.
Mixed Integer Programming and Heuristic Scheduling for Space Communication Networks
NASA Technical Reports Server (NTRS)
Cheung, Kar-Ming; Lee, Charles H.
2012-01-01
We developed framework and the mathematical formulation for optimizing communication network using mixed integer programming. The design yields a system that is much smaller, in search space size, when compared to the earlier approach. Our constrained network optimization takes into account the dynamics of link performance within the network along with mission and operation requirements. A unique penalty function is introduced to transform the mixed integer programming into the more manageable problem of searching in a continuous space. The constrained optimization problem was proposed to solve in two stages: first using the heuristic Particle Swarming Optimization algorithm to get a good initial starting point, and then feeding the result into the Sequential Quadratic Programming algorithm to achieve the final optimal schedule. We demonstrate the above planning and scheduling methodology with a scenario of 20 spacecraft and 3 ground stations of a Deep Space Network site. Our approach and framework have been simple and flexible so that problems with larger number of constraints and network can be easily adapted and solved.
Real-Time MENTAT programming language and architecture
NASA Technical Reports Server (NTRS)
Grimshaw, Andrew S.; Silberman, Ami; Liu, Jane W. S.
1989-01-01
Real-time MENTAT, a programming environment designed to simplify the task of programming real-time applications in distributed and parallel environments, is described. It is based on the same data-driven computation model and object-oriented programming paradigm as MENTAT. It provides an easy-to-use mechanism to exploit parallelism, language constructs for the expression and enforcement of timing constraints, and run-time support for scheduling and exciting real-time programs. The real-time MENTAT programming language is an extended C++. The extensions are added to facilitate automatic detection of data flow and generation of data flow graphs, to express the timing constraints of individual granules of computation, and to provide scheduling directives for the runtime system. A high-level view of the real-time MENTAT system architecture and programming language constructs is provided.
SLURM: Simple Linux Utility for Resource Management
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jette, M; Dunlap, C; Garlick, J
2002-04-24
Simple Linux Utility for Resource Management (SLURM) is an open source, fault-tolerant, and highly scalable cluster management and job scheduling system for Linux clusters of thousands of nodes. Components include machine status, partition management, job management, and scheduling modules. The design also includes a scalable, general-purpose communication infrastructure. Development will take place in four phases: Phase I results in a solid infrastructure; Phase II produces a functional but limited interactive job initiation capability without use of the interconnect/switch; Phase III provides switch support and documentation; Phase IV provides job status, fault-tolerance, and job queuing and control through Livermore's Distributed Productionmore » Control System (DPCS), a meta-batch and resource management system.« less
SpaceX CRS-10 "What's On Board" Science Briefing
2017-02-17
Mike Cisewski, Stratospheric Aerosol and Gas Experiment (SAGE) III Project manager at NASA’s Langley Research Center in Hampton, Virginia, speaks to members of social media in the Kennedy Space Center’s Press Site auditorium. The briefing focused on instruments to be delivered to the International Space Station on the SpaceX CRS-10 mission. Cisewski explained that the SAGE III is designed to study ozone in the atmosphere. A Dragon spacecraft is scheduled to be launched from Kennedy’s Launch Complex 39A on Feb. 18 atop a SpaceX Falcon 9 rocket on the company's 10th Commercial Resupply Services mission to the space station.
Code of Federal Regulations, 2010 CFR
2010-07-01
... ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Solid Waste Disposal Programs § 256.27 Recommendation for schedules leading...