Science.gov

Sample records for iii program scheduling

  1. S-CHART - SCHEDULING CHART PROGRAM

    NASA Technical Reports Server (NTRS)

    Klinkner, E. R.

    1994-01-01

    The Scheduling Chart Program (S-Chart) uses simple menu choices to produce high quality Gantt type scheduling and production time-line charts with minimal data entry requirements. The software produces high quality charts (20, 40, and 80 day options) in 10-20 minutes including start up, data entry, and printing. Reprints take less than one minute. Some of the more significant features are as follows: speed and ease of use with menu driven selections from start to finish, storage and catalogs of all data sets for rapid access and manipulation, compact program size to permit storage of dozens of data sets on the program disc, and creation of ASCII text files of graphs for rapid printing. The final product of the plot routine is an extended ASCII character file which shows the events scheduled and actual work dates. This file may be printed from the program, from DOS, or imported to a word processor for customizing. S-Chart is not intended to take the place of commercial scheduling/project management software. However, it is a simple, somewhat limited Gantt chart plotter and scheduling tracking program with an emphasis on straightforward data entry. There is no complex relationship building between the scheduled events. Dates are entered as dates, not as algebraic functions. All the files of S-Chart, except for the graph picture and the stand-alone executable, were written in 100% dBASE III compatible code. The executable code was created with CLIPPER and the graph picture files are written in ASCII code. S-Chart was implemented on an IBM PC series machine under DOS and requires 215k bytes of memory. The program was developed in 1988.

  2. 78 FR 72013 - Schedules of Controlled Substances: Placement of Perampanel into Schedule III

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-02

    ... the CSA, with the concurrence of NIDA. 50 FR 9518, Mar. 8, 1995. In addition, because the Secretary of... Perampanel into Schedule III'' on October 22, 2013 (78 FR 62500), which proposed placement of perampanel in...) benzonitrile], including its salts, isomers, and salts of isomers, into schedule III of the...

  3. 78 FR 62500 - Schedules of Controlled Substances: Placement of Perampanel into Schedule III

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-22

    ..., isomers, and salts of isomers, into Schedule III of the Controlled Substances Act (CSA). This proposed...) benzonitrile hydrate], including its salts, isomers, and salts of isomers, warrants control in Schedule III of... entities. The purpose of this proposed rule is to place perampanel, including its salts, isomers, and...

  4. Scheduling: A guide for program managers

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The following topics are discussed concerning scheduling: (1) milestone scheduling; (2) network scheduling; (3) program evaluation and review technique; (4) critical path method; (5) developing a network; (6) converting an ugly duckling to a swan; (7) network scheduling problem; (8) (9) network scheduling when resources are limited; (10) multi-program considerations; (11) influence on program performance; (12) line-of-balance technique; (13) time management; (14) recapitulization; and (15) analysis.

  5. 77 FR 60743 - Proposed Collection; Comment Request for Schedule F, Part II and III (Form 1040)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-04

    ... Internal Revenue Service Proposed Collection; Comment Request for Schedule F, Part II and III (Form 1040..., Part II and III (Form 1040), Profit or Loss From Farming. DATES: Written comments should be received on... Number: Schedule F, Part II and III (Form 1040). Abstract: Schedule F, Part II and III (Form 1040)...

  6. SO/ST/SRG - SCHEDULING PROGRAMS

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer, SO (COSMIC Program MSC-21525), Schedule Tracker, ST (COSMIC Program MSC-21526), and Report Generator, SRG (COSMIC Program MSC-21527), are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Organizer contains a primary menu that is displayed at the beginning of the program. The menu provides options as follows: to write input files to an output distribution file, to change a schedule title field and/or distribution list field, to browse through the schedule and input names file for requested schedule numbers, to create an input names file and a schedule titles file, and to delete input schedule titles and associated names. SO provides a choice of two input files. One file holds 25 groups of up to 25 names for each group. The other file holds 25 records. Each 60-character-long record holds a task schedule title or it is a blank entry. SO creates three output files. One holds the formatted list of schedule titles for printout. Another file holds the formatted distribution list for printout. There is one for each input names file schedule group. The third output file holds the schedule title of the last schedule title file deleted by the user. Schedule Tracker provides an effective method for tracking tasks that are "past due" and/or "near term". ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are scheduled for recent completion (near term

  7. SRG - SCHEDULE REPORT GENERATOR COMPUTER PROGRAM

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer, SO (COSMIC Program MSC-21525), Schedule Tracker, ST (COSMIC Program MSC-21526), and Schedule Report Generator, SRG, are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Tracker provides an effective method for tracking tasks that are 'past due' and/or 'near term'. ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are schedule for recent completion (near term). Schedule Reports Generator provides a simple method for generating periodic schedule reports. SRG enables an engineering manager to monitor tasks assigned to staff members on a weekly basis. SRG sorts three types of reports using one or more data fields as sort keys. One type is sorted using the calendar year as the primary key and the end date as the secondary key. Another type is sorted by flight number. A third type of report, Waterfall plots, is also generated by SRG using the end date as the sorting key. SRG requires as input a single file or two concatenated files with up to 400 single line entries. The user constructs the input file by using the LSE editor VAX utility prior to the execution of the program. The user is able to modify the current functional description text lines just displayed. ST and SRG use the same data base file as input. The common data base file has a maximum number of 400 entries. The time span of all three programs is nineteen months. Both of these maximum

  8. Advanced Reactors Transition Program Resource Loaded Schedule

    SciTech Connect

    GANTT, D.A.

    2000-01-12

    The Advanced Reactors Transition (ART) Resource Loaded Schedule (RLS) provides a cost and schedule baseline for managing the project elements within the ART Program. The Fast Flux Test Facility (FETF) activities are delineated through the end of FY 2000, assuming continued standby. The Nuclear Energy (NE) Legacies and Plutonium Recycle Test Reactor (PRTR) activities are delineated through the end of the deactivation process. This revision reflects the 19 Oct 1999 baseline.

  9. Advanced Reactors Transition Program Resource Loaded Schedule

    SciTech Connect

    BOWEN, W.W.

    1999-11-08

    The Advanced Reactors Transition (ART) Resource Loaded Schedule (RLS) provides a cost and schedule baseline for managing the project elements within the ART Program. The Fast Flux Test Facility (FFTF) activities are delineated through the end of FY 2000, assuming continued standby. The Nuclear Energy (NE) Legacies and Plutonium Recycle Test Reactor (PRTR) activities are delineated through the end of the deactivation process. This document reflects the 1 Oct 1999 baseline.

  10. An integrated scheduling and program management system

    NASA Astrophysics Data System (ADS)

    Porter, D.; Gibson, J. D.; Williams, G. G.

    2012-09-01

    An integrated scheduling and program management system is being developed for the MMT Observatory (MMTO), Arizona, USA. A systems engineering approach is used to combine existing and new relational databases, spreadsheets, file storage systems, and web-based user interfaces into a single unified system. An overview of software design, data management, user interfaces, and techniques for performance assessment is presented. Goals of this system include streamlined data management and an optimized user experience. The MMTO has over a dozen different telescope configurations, including three secondary mirrors and a wide range of observing instruments. Scheduling is complex for the varying telescope configurations, limited available observing time, and appropriate astronomic conditions (e.g., lunar phase) for each science project. Scheduled telescope configurations can be used to perform safety checks of actual configuration during telescope operations. Programmatic information is automatically input into nightly telescope operator (TO) logs by the system. The TO's provide additional information into the system on telescope usage, observing conditions (e.g., weather conditions), and observatory closure (e.g., from instrument malfunction or inclement weather). All of this information is synthesized to assess telescope and observatory performance. Web interfaces to the system can be used by observers to submit information, such as travel plans, instrumentation requirements, and observing catalogs. A service request (SR) (i.e., trouble report) system has also been developed for tracking operational issues. The specific needs of the MMTO have been met through in-house software development of this integrated scheduling and program management system.

  11. Ocean drilling program sets FY 92 schedule

    NASA Astrophysics Data System (ADS)

    Austin, James A., ames A. Austin, Jr.

    At its November 28-December 1, 1990, meeting in Kailua-Kona, Hawaii, the Planning Committee (PCOM) of the Ocean Drilling Program, in association with chairpersons of ODP's scientific advisory structure, has established its Program Plan for Fiscal Year 1992 (approximately mid-November 1991 through mid-January 1993). ODP is the successor to the Deep Sea Drilling Project and the International Phase of Ocean Drilling, and is a consortium of countries led by the United States with a broad mandate to conduct scientific ocean drilling in the world's ocean basins. Based upon ODP's Long Range Plan (available from Joint Oceanographic Institutions, Inc., Washington, D.C.) and the scientific priorities set by ODP's thematic panels, PCOM has placed seven 56-day drilling legs on the proposed schedule, beginning with Leg 141.The new schedule is generally consistent with long-term ODP planning, which has stipulated that drilling operations will be concentrated in the eastern Pacific until late 1992, when the drill ship JOIDES Resolution will transit to the North Atlantic for operations there during calendar 1993. Each program in FY 1992 is briefly summarized below (see also Figure 1), both to alert the Earth sciences community to future opportunities for direct participation aboard the drill ship and to publicize a new ODP policy for “supplemental science” (see accompanying sidebar), which will be initiated for the period covered by legs 141-147.

  12. Runway Scheduling Using Generalized Dynamic Programming

    NASA Technical Reports Server (NTRS)

    Montoya, Justin; Wood, Zachary; Rathinam, Sivakumar

    2011-01-01

    A generalized dynamic programming method for finding a set of pareto optimal solutions for a runway scheduling problem is introduced. The algorithm generates a set of runway fight sequences that are optimal for both runway throughput and delay. Realistic time-based operational constraints are considered, including miles-in-trail separation, runway crossings, and wake vortex separation. The authors also model divergent runway takeoff operations to allow for reduced wake vortex separation. A modeled Dallas/Fort Worth International airport and three baseline heuristics are used to illustrate preliminary benefits of using the generalized dynamic programming method. Simulated traffic levels ranged from 10 aircraft to 30 aircraft with each test case spanning 15 minutes. The optimal solution shows a 40-70 percent decrease in the expected delay per aircraft over the baseline schedulers. Computational results suggest that the algorithm is promising for real-time application with an average computation time of 4.5 seconds. For even faster computation times, two heuristics are developed. As compared to the optimal, the heuristics are within 5% of the expected delay per aircraft and 1% of the expected number of runway operations per hour ad can be 100x faster.

  13. 75 FR 67054 - Listing of Approved Drug Products Containing Dronabinol in Schedule III

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-01

    ...\\ 51 FR 17476 (May 13, 1986). DEA subsequently transferred the FDA-approved Marinol formulation from schedule II to schedule III. 64 FR 35928 (July 2, 1999). Recently, firms have submitted to FDA ANDAs for... product is a generic formulation of Marinol and contains dronabinol, the (-) isomer of delta-9-...

  14. On program restructuring, scheduling, and communication for parallel processor systems

    SciTech Connect

    Polychronopoulos, Constantine D.

    1986-08-01

    This dissertation discusses several software and hardware aspects of program execution on large-scale, high-performance parallel processor systems. The issues covered are program restructuring, partitioning, scheduling and interprocessor communication, synchronization, and hardware design issues of specialized units. All this work was performed focusing on a single goal: to maximize program speedup, or equivalently, to minimize parallel execution time. Parafrase, a Fortran restructuring compiler was used to transform programs in a parallel form and conduct experiments. Two new program restructuring techniques are presented, loop coalescing and subscript blocking. Compile-time and run-time scheduling schemes are covered extensively. Depending on the program construct, these algorithms generate optimal or near-optimal schedules. For the case of arbitrarily nested hybrid loops, two optimal scheduling algorithms for dynamic and static scheduling are presented. Simulation results are given for a new dynamic scheduling algorithm. The performance of this algorithm is compared to that of self-scheduling. Techniques for program partitioning and minimization of interprocessor communication for idealized program models and for real Fortran programs are also discussed. The close relationship between scheduling, interprocessor communication, and synchronization becomes apparent at several points in this work. Finally, the impact of various types of overhead on program speedup and experimental results are presented. 69 refs., 74 figs., 14 tabs.

  15. Master schedule for CY-1981 Hanford environmental surveillance routine program

    SciTech Connect

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.

    1980-12-01

    The current schedule of data collection for the routine environmental surveillance program at the Hanford Site is provided. Questions about specific entries should be referred to the authors since modifications to the schedule are made during the year and special areas of study, usually of short duration, are not scheduled. The environmental surveillance program objectives are to evaluate the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in Manual Chapter 0513, and to monitor Hanford operations for compliance with applicable environmental criteria given in Manual Chapter 0524 and Washington State Water Quality Standards. Air quality data obtained in a separate program are also reported. The collection schedule for potable water is shown but it is not part of the routine environmental surveillance program. Schedules are presented for the following subjects: air, Columbia River, sanitary water, surface water, ground water, foodstuffs, wildlife, soil and vegetation, external radiation measurement, portable instrument surveys, and surveillance of waste disposal sites. (JGB)

  16. An Assessment of a Senior High School Modular Scheduling Program.

    ERIC Educational Resources Information Center

    Hicken, James E.

    Modular scheduling was introduced in the academic year 1967-68 at North Miami Senior High School. After a year's operation under the Stanford School Scheduling System, an "at home" evaluation of the new program was made. Student grades on a cross-sectional basis did not suffer, but rather showed a slight improvement. Moderate improvement was also…

  17. Master schedule for CY-1982 Hanford environmental surveillance routine program

    SciTech Connect

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.

    1981-12-01

    This report provides the current schedule of data collection for the routine environmental surveillance program at the Hanford Site. The environmental surveillance program objectives are to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5484.1. The routine sampling schedule provided does not include samples which are planned to be collected during FY-1982 in support of special studies or for quality control purposes. In addition, the routine program outlined in this schedule is subject to modification during the year in response to changes in Site operations, program requirements, or unusual sample results. Sampling schedules are presented for the following: air; Columbia River; sanitary water; surface water; ground water; foodstuffs; wildlife; soil and vegetation; external radiation measurements; portable instrument surveys; and surveillance of waste disposal sites. (ATT)

  18. The Berkeley SETI Program: SERENDIP III

    NASA Astrophysics Data System (ADS)

    Donnelly, C.; Bowyer, S.; Werthimer, D.; Ng, D.; Cobb, J.

    1993-05-01

    The Berkeley SETI (Search for Extraterrestrial Intelligence) program, named SERENDIP, was begun in the late 1970's. It is aimed at detecting narrow band radio signals from extraterrestrial civilizations. The SERENDIP I, II and III systems have operated autonomously in a piggyback search mode, conducting unobtrusive, long-term observations on the world's largest radio telescopes. The latest generation SERENDIP instrument, SERENDIP III, is a four million channel FFT-based spectrum analyzer operating at 0.6 Hz resolution with a 1.7 second integration time. SERENDIP III has been operating at the NAIC Arecibo Observatory since April, 1992. Several independent criteria suggest that this search is the most sensitive SETI search in operation. To date SERENDIP III has accumulated over 3600 hours of high quality telescope time, observing 75% of the sky visible by the Arecibo telescope. Over this period SERENDIP III has analyzed over 30 trillion spectral bins, and recorded information on 110 million strong narrow band signals in the 424--435 MHz band. A handful of these signals have survived our RFI rejection and signal detection algorithms, and have thus been added to our list of ETI candidate signals. A follow-up observation program will be conducted next year in an attempt to verify each of these candidate signals. This work has been supported by NASA grant NAGW-2722.

  19. 21 CFR 1312.30 - Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule III, IV, and V non-narcotic controlled... Controlled Substances § 1312.30 Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit. The following Schedule III, IV, and V non-narcotic controlled substances...

  20. 21 CFR 1312.30 - Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 9 2012-04-01 2012-04-01 false Schedule III, IV, and V non-narcotic controlled... Controlled Substances § 1312.30 Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit. The following Schedule III, IV, and V non-narcotic controlled substances...

  1. 21 CFR 1312.30 - Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 9 2014-04-01 2014-04-01 false Schedule III, IV, and V non-narcotic controlled... Controlled Substances § 1312.30 Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit. The following Schedule III, IV, and V non-narcotic controlled substances...

  2. 21 CFR 1312.30 - Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 9 2013-04-01 2013-04-01 false Schedule III, IV, and V non-narcotic controlled... Controlled Substances § 1312.30 Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit. The following Schedule III, IV, and V non-narcotic controlled substances...

  3. 21 CFR 1312.30 - Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 9 2011-04-01 2011-04-01 false Schedule III, IV, and V non-narcotic controlled... Controlled Substances § 1312.30 Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit. The following Schedule III, IV, and V non-narcotic controlled substances...

  4. TRU Waste Management Program cost/schedule optimization analysis

    SciTech Connect

    Detamore, J.A. . Joint Integration Office); Raudenbush, M.H.; Wolaver, R.W.; Hastings, G.A. Corp., Boulder, CO )

    1985-10-01

    The cost/schedule optimization task is a necessary function to insure that program goals and plans are optimized from a cost and schedule aspect. Results of this study will offer DOE information with which it can establish, within institutional constraints, the most efficient program for the long-term management and disposal of contact handled transuranic waste (CH-TRU). To this end, a comprehensive review of program cost/schedule tradeoffs has been made, to identify any major cost saving opportunities that may be realized by modification of current program plans. It was decided that all promising scenarios would be explored, and institutional limitations to implementation would be described. Since a virtually limitless number of possible scenarios can be envisioned, it was necessary to distill these possibilities into a manageable number of alternatives. The resultant scenarios were described in the cost/schedule strategy and work plan document. Each scenario was compared with the base case: waste processing at the originating site; transport of CH-TRU wastes in TRUPACT; shipment of drums in 6-Packs; 25 year stored waste workoff; WIPP operational 10/88, with all sites shipping to WIPP beginning 10/88; and no processing at WIPP. Major savings were identified in two alternate scenarios: centralize waste processing at INEL and eliminate rail shipment of TRUPACT. No attempt was made to calculate savings due to combination of scenarios. 1 ref., 5 figs., 1 tab. (MHB)

  5. Microgrid Reliability Modeling and Battery Scheduling Using Stochastic Linear Programming

    SciTech Connect

    Cardoso, Goncalo; Stadler, Michael; Siddiqui, Afzal; Marnay, Chris; DeForest, Nicholas; Barbosa-Povoa, Ana; Ferrao, Paulo

    2013-05-23

    This paper describes the introduction of stochastic linear programming into Operations DER-CAM, a tool used to obtain optimal operating schedules for a given microgrid under local economic and environmental conditions. This application follows previous work on optimal scheduling of a lithium-iron-phosphate battery given the output uncertainty of a 1 MW molten carbonate fuel cell. Both are in the Santa Rita Jail microgrid, located in Dublin, California. This fuel cell has proven unreliable, partially justifying the consideration of storage options. Several stochastic DER-CAM runs are executed to compare different scenarios to values obtained by a deterministic approach. Results indicate that using a stochastic approach provides a conservative yet more lucrative battery schedule. Lower expected energy bills result, given fuel cell outages, in potential savings exceeding 6percent.

  6. A Mixed Integer Linear Program for Airport Departure Scheduling

    NASA Technical Reports Server (NTRS)

    Gupta, Gautam; Jung, Yoon Chul

    2009-01-01

    Aircraft departing from an airport are subject to numerous constraints while scheduling departure times. These constraints include wake-separation constraints for successive departures, miles-in-trail separation for aircraft bound for the same departure fixes, and time-window or prioritization constraints for individual flights. Besides these, emissions as well as increased fuel consumption due to inefficient scheduling need to be included. Addressing all the above constraints in a single framework while allowing for resequencing of the aircraft using runway queues is critical to the implementation of the Next Generation Air Transport System (NextGen) concepts. Prior work on airport departure scheduling has addressed some of the above. However, existing methods use pre-determined runway queues, and schedule aircraft from these departure queues. The source of such pre-determined queues is not explicit, and could potentially be a subjective controller input. Determining runway queues and scheduling within the same framework would potentially result in better scheduling. This paper presents a mixed integer linear program (MILP) for the departure-scheduling problem. The program takes as input the incoming sequence of aircraft for departure from a runway, along with their earliest departure times and an optional prioritization scheme based on time-window of departure for each aircraft. The program then assigns these aircraft to the available departure queues and schedules departure times, explicitly considering wake separation and departure fix restrictions to minimize total delay for all aircraft. The approach is generalized and can be used in a variety of situations, and allows for aircraft prioritization based on operational as well as environmental considerations. We present the MILP in the paper, along with benefits over the first-come-first-serve (FCFS) scheme for numerous randomized problems based on real-world settings. The MILP results in substantially reduced

  7. Energy-optimal programming and scheduling of the manufacturing operations

    NASA Astrophysics Data System (ADS)

    Badea, N.; Frumuşanu, G.; Epureanu, A.

    2016-08-01

    The shop floor energy system covers the energy consumed for both the air conditioning and manufacturing processes. At the same time, most of energy consumed in manufacturing processes is converted in heat released in the shop floor interior and has a significant influence on the microclimate. Both these components of the energy consumption have a time variation that can be realistic assessed. Moreover, the consumed energy decisively determines the environmental sustainability of the manufacturing operation, while the expenditure for running the shop floor energy system is a significant component of the manufacturing operations cost. Finally yet importantly, the energy consumption can be fundamentally influenced by properly programming and scheduling of the manufacturing operations. In this paper, we present a method for modeling and energy-optimal programming & scheduling the manufacturing operations. In this purpose, we have firstly identified two optimization targets, namely the environmental sustainability and the economic efficiency. Then, we have defined three optimization criteria, which can assess the degree of achieving these targets. Finally, we have modeled the relationship between the optimization criteria and the parameters of programming and scheduling. In this way, it has been revealed that by adjusting these parameters one can significantly improve the sustainability and efficiency of manufacturing operations. A numerical simulation has proved the feasibility and the efficiency of the proposed method.

  8. TRU Waste Management Program. Cost/schedule optimization analysis

    SciTech Connect

    Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.; Hastings, G.A.

    1985-10-01

    This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.

  9. Mixed Integer Programming and Heuristic Scheduling for Space Communication Networks

    NASA Technical Reports Server (NTRS)

    Cheung, Kar-Ming; Lee, Charles H.

    2012-01-01

    We developed framework and the mathematical formulation for optimizing communication network using mixed integer programming. The design yields a system that is much smaller, in search space size, when compared to the earlier approach. Our constrained network optimization takes into account the dynamics of link performance within the network along with mission and operation requirements. A unique penalty function is introduced to transform the mixed integer programming into the more manageable problem of searching in a continuous space. The constrained optimization problem was proposed to solve in two stages: first using the heuristic Particle Swarming Optimization algorithm to get a good initial starting point, and then feeding the result into the Sequential Quadratic Programming algorithm to achieve the final optimal schedule. We demonstrate the above planning and scheduling methodology with a scenario of 20 spacecraft and 3 ground stations of a Deep Space Network site. Our approach and framework have been simple and flexible so that problems with larger number of constraints and network can be easily adapted and solved.

  10. Advanced Emissions Control Development Program: Phase III

    SciTech Connect

    G.T. Amrhein; R.T. Bailey; W. Downs; M.J. Holmes; G.A. Kudlac; D.A. Madden

    1999-07-01

    The primary objective of the Advanced Emissions Control Development Program (AECDP) is to develop practical, cost-effective strategies for reducing the emissions of air toxics from coal-fired boilers. The project goal is to effectively control air toxic emissions through the use of conventional flue gas clean-up equipment such as electrostatic precipitators (ESPs), fabric filters (baghouses - BH), and wet flue gas desulfurization systems (WFGD). Development work concentrated on the capture of trace metals, fine particulate, hydrogen chloride and hydrogen fluoride, with an emphasis on the control of mercury. The AECDP project is jointly funded by the US Department of Energy's Federal Energy Technology Center (DOE), the Ohio Coal Development Office within the Ohio Department of Development (OCDO), and Babcock and Wilcox, a McDermott company (B and W). This report discusses results of all three phases of the AECDP project with an emphasis on Phase III activities. Following the construction and evaluation of a representative air toxics test facility in Phase I, Phase II focused on characterization of the emissions of mercury and other air toxics and the control of these emissions for typical operating conditions of conventional flue gas clean-up equipment. Some general comments that can be made about the control of air toxics while burning a high-sulfur bituminous coal are as follows: (1) particulate control devices such as ESP's and baghouses do a good job of removing non-volatile trace metals, (2) particulate control devices (ESPs and baghouses) effectively remove the particulate-phase mercury, but the particulate-phase mercury was only a small fraction of the total for the coals tested, (3) wet scrubbing can effectively remove hydrogen chloride and hydrogen fluoride, and (4) wet scrubbers show good potential for the removal of mercury when operated under certain conditions, however, for certain applications, system enhancements can be required to achieve high

  11. 21 CFR 1301.28 - Exemption from separate registration for practitioners dispensing or prescribing Schedule III, IV...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... practitioners dispensing or prescribing Schedule III, IV, or V narcotic controlled drugs approved by the Food..., or V narcotic controlled drugs approved by the Food and Drug Administration specifically for use in..., IV, or V narcotic controlled drugs or combinations of narcotic controlled drugs which have...

  12. 21 CFR 1301.28 - Exemption from separate registration for practitioners dispensing or prescribing Schedule III, IV...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... practitioners dispensing or prescribing Schedule III, IV, or V narcotic controlled drugs approved by the Food..., or V narcotic controlled drugs approved by the Food and Drug Administration specifically for use in..., IV, or V narcotic controlled drugs or combinations of narcotic controlled drugs which have...

  13. 21 CFR 1301.28 - Exemption from separate registration for practitioners dispensing or prescribing Schedule III, IV...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... practitioners dispensing or prescribing Schedule III, IV, or V narcotic controlled drugs approved by the Food..., or V narcotic controlled drugs approved by the Food and Drug Administration specifically for use in..., IV, or V narcotic controlled drugs or combinations of narcotic controlled drugs which have...

  14. 21 CFR 1301.28 - Exemption from separate registration for practitioners dispensing or prescribing Schedule III, IV...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... practitioners dispensing or prescribing Schedule III, IV, or V narcotic controlled drugs approved by the Food..., or V narcotic controlled drugs approved by the Food and Drug Administration specifically for use in..., IV, or V narcotic controlled drugs or combinations of narcotic controlled drugs which have...

  15. 21 CFR 1306.25 - Transfer between pharmacies of prescription information for Schedules III, IV, and V controlled...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... prescription pursuant to 21 CFR 1306.05 and include: (i) Date of issuance of original prescription; (ii... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Transfer between pharmacies of prescription... Substances Listed in Schedules III, IV, and V § 1306.25 Transfer between pharmacies of...

  16. 21 CFR 1301.28 - Exemption from separate registration for practitioners dispensing or prescribing Schedule III, IV...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Exemption from separate registration for practitioners dispensing or prescribing Schedule III, IV, or V narcotic controlled drugs approved by the Food and Drug Administration specifically for use in maintenance or detoxification treatment. 1301.28 Section 1301.28 Food and Drugs DRUG...

  17. Hanford Environmental Monitoring Program schedule for samples, analyses, and measurements for calendar year 1985

    SciTech Connect

    Blumer, P.J.; Price, K.R.; Eddy, P.A.; Carlile, J.M.V.

    1984-12-01

    This report provides the CY 1985 schedule of data collection for the routine Hanford Surface Environmental Monitoring and Ground-Water Monitoring Programs at the Hanford Site. The purpose is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5484.1. The routine sampling schedule provided herein does not include samples scheduled to be collected during FY 1985 in support of special studies, special contractor support programs, or for quality control purposes. In addition, the routine program outlined in this schedule is subject to modification during the year in response to changes in site operations, program requirements, or unusual sample results.

  18. Content Analysis Schedule for Bilingual Education Programs: Del Valle Bilingual Education Program.

    ERIC Educational Resources Information Center

    Ehrlich, Roselin; Shore, Marietta Saravia

    This content analysis schedule for the Del Valle Bilingual Education Program of Del Valle, Texas, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the…

  19. San Francisco Chinese Bilingual Pilot Program. Content Analysis Schedule for Bilingual Education Programs.

    ERIC Educational Resources Information Center

    Wood, Ruth; Lavine, Linda

    This content analysis schedule for the Chinese Bilingual Pilot Program of the San Francisco Unified School District presents information on the history, funding, and scope of the project in its second year. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is…

  20. Mixed Integer Programming and Heuristic Scheduling for Space Communication

    NASA Technical Reports Server (NTRS)

    Lee, Charles H.; Cheung, Kar-Ming

    2013-01-01

    Optimal planning and scheduling for a communication network was created where the nodes within the network are communicating at the highest possible rates while meeting the mission requirements and operational constraints. The planning and scheduling problem was formulated in the framework of Mixed Integer Programming (MIP) to introduce a special penalty function to convert the MIP problem into a continuous optimization problem, and to solve the constrained optimization problem using heuristic optimization. The communication network consists of space and ground assets with the link dynamics between any two assets varying with respect to time, distance, and telecom configurations. One asset could be communicating with another at very high data rates at one time, and at other times, communication is impossible, as the asset could be inaccessible from the network due to planetary occultation. Based on the network's geometric dynamics and link capabilities, the start time, end time, and link configuration of each view period are selected to maximize the communication efficiency within the network. Mathematical formulations for the constrained mixed integer optimization problem were derived, and efficient analytical and numerical techniques were developed to find the optimal solution. By setting up the problem using MIP, the search space for the optimization problem is reduced significantly, thereby speeding up the solution process. The ratio of the dimension of the traditional method over the proposed formulation is approximately an order N (single) to 2*N (arraying), where N is the number of receiving antennas of a node. By introducing a special penalty function, the MIP problem with non-differentiable cost function and nonlinear constraints can be converted into a continuous variable problem, whose solution is possible.

  1. Classification of two steroids, prostanozol and methasterone, as Schedule III anabolic steroids under the Controlled Substance Act. Final rule.

    PubMed

    2012-07-30

    With the issuance of this Final Rule, the Administrator of the DEA classifies the following two steroids as "anabolic steroids'' under the Controlled Substances Act (CSA): prostanozol (17[beta]-hydroxy-5[alpha]-androstano[3,2-c]pyrazole) and methasterone (2[alpha],17[alpha]-dimethyl-5[alpha]-androstan-17[beta]-ol-3-one). These steroids and their salts, esters, and ethers are Schedule III controlled substances subject to the regulatory control provisions of the CSA.

  2. Quarterly report on program cost and schedule, third quarter FY 1992

    SciTech Connect

    1992-10-01

    This report is intended to provide a summary of the cost and schedule performance for the civilian Radioactive Waste Management Program. Historical and current cost profiles (extracted from the DOE Financial information System) are presented for each of the major program elements. Also included in this report are the program schedule baseline, the status of near-term program milestones and the status of the Nuclear Waste Fund revenues and disbursements. This report includes data through June 1992.

  3. Utility-based optimization of phase II/III programs.

    PubMed

    Kirchner, Marietta; Kieser, Meinhard; Götte, Heiko; Schüler, Armin

    2016-01-30

    Phase II and phase III trials play a crucial role in drug development programs. They are costly and time consuming and, because of high failure rates in late development stages, at the same time risky investments. Commonly, sample size calculation of phase III is based on the treatment effect observed in phase II. Therefore, planning of phases II and III can be linked. The performance of the phase II/III program crucially depends on the allocation of the resources to phases II and III by appropriate choice of the sample size and the rule applied to decide whether to stop the program after phase II or to proceed. We present methods for a program-wise phase II/III planning that aim at determining optimal phase II sample sizes and go/no-go decisions in a time-to-event setting. Optimization is based on a utility function that takes into account (fixed and variable) costs of the drug development program and potential gains after successful launch. The proposed methods are illustrated by application to a variety of scenarios typically met in oncology drug development.

  4. Dose-schedule finding in phase I/II clinical trials using a Bayesian isotonic transformation

    PubMed Central

    Li, Yisheng; Bekele, B. Nebiyou; Ji, Yuan; Cook, John D.

    2015-01-01

    Summary A dose-schedule-finding trial is a new type of oncology trial in which investigators aim to find a combination of dose and treatment schedule that has a large probability of efficacy yet a relatively small probability of toxicity. We demonstrate that a major difference between traditional dose-finding and dose-schedule-finding trials is that while the toxicity probabilities follow a simple nondecreasing order in dose-finding trials, those of dose-schedule-finding trials may adhere to a matrix order. We show that the success of a dose-schedule-finding method requires careful statistical modeling and a sensible dose-schedule allocation scheme. We propose a Bayesian hierarchical model that jointly models the unordered probabilities of toxicity and efficacy, and apply a Bayesian isotonic transformation to the posterior samples of the toxicity probabilities, so that the transformed posterior samples adhere to the matrix order constraints. Based on the joint posterior distribution of the order-constrained toxicity probabilities and the unordered efficacy probabilities, we develop a dose-schedule-finding algorithm that sequentially allocates patients to the best dose-schedule combination under certain criteria. We illustrate our methodology through its application to a clinical trial in leukemia, and compare it to two alternative approaches. PMID:18563789

  5. Community College Exemplary Instructional Programs, Volume III.

    ERIC Educational Resources Information Center

    Fideler, Elizabeth F., Ed.; Bazer, Gerald, Ed.

    Third in an annual series, this volume presents brief descriptions of a number of outstanding community college instructional programs identified by the National Council of Instructional Administrators (NCIA). Each description includes the address and telephone number of the college in which the program operates, and the names of the college…

  6. Interdisciplinary Studies Program. Teacher's Guide: Part III.

    ERIC Educational Resources Information Center

    Valencia Community Coll., Orlando, FL.

    This teacher's guide was developed for the third of four courses in Valencia Community College's Interdisciplinary Studies program, a 2-year core general education curriculum which chronologically examines the major developments in the evolution of human knowledge. The guide provides an introductory overview of the course's topic (i.e., Western…

  7. Cooperative Program Planning and Flexible Scheduling: What Do Principals Really Think?

    ERIC Educational Resources Information Center

    Mills, Mary Louise

    1991-01-01

    Presents responses of approximately 16 principals in Halifax City School District (Nova Scotia) who were interviewed to elicit their personal professional opinions regarding scheduling of classes in the library, the concept of cooperative program planning, the adjustment to flexible scheduling and its inherent difficulties, and the type of staff…

  8. Environmental Technology Verification (ETV) Program Case Studies: Demonstrating Program Outcomes, Volume III

    EPA Science Inventory

    This booklet, ETV Program Case Studies: Demonstrating Program Outcomes, Volume III contains two case studies, addressing verified environmental technologies for decentalized wastewater treatment and converting animal waste to energy. Each case study contains a brief description ...

  9. Master schedule for CY-1984 Hanford environmental surveillance routine sampling program

    SciTech Connect

    Blumer, P.J.; Price, K.R.; Eddy, P.A.; Carlile, J.M.V.

    1983-12-01

    This report provides the current schedule of data collection for the routine Hanford environmental surveillance and ground-water Monitoring Programs at the Hanford Site. The purpose is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs. The routine sampling schedule provided herein does not include samples that are planned to be collected during FY-1984 in support of special studies, special contractor support programs, or for quality control purposes.

  10. Content Analysis Schedule for Bilingual Education Programs: Proyecto PAL.

    ERIC Educational Resources Information Center

    Gonzalez, Castor

    This content analysis schedule for "Proyecto PAL" in San Jose, California, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the linguistic background of…

  11. Stochastic programming methods for scheduling of airport runway operations under uncertainty

    NASA Astrophysics Data System (ADS)

    Solveling, Gustaf

    Runway systems at airports have been identified as a major source of delay in the aviation system and efficient runway operations are, therefore, important to maintain and/or increase the capacity of the entire aviation system. The goal of the airport runway scheduling problem is to schedule a set of aircraft and minimize a given objective while maintaining separation requirements and enforcing other operational constraints. Uncertain factors such as weather, surrounding traffic and pilot behavior affect when aircraft can be scheduled, and these factors need to be considered in planning models. In this thesis we propose two stochastic programs to address the stochastic airport runway scheduling problem and similarly structured machine scheduling problems. In the first part, we develop a two-stage stochastic integer programming model and analyze it by developing alternative formulations and solution methods. As part of our analysis, we first show that a restricted version of the stochastic runway scheduling problem is equivalent to a machine scheduling problem on a single machine with sequence dependent setup times and stochastic due dates. We then extend this restricted model by considering characteristics specific to the runway scheduling problem and present two different stochastic integer programming models. We derive some tight valid inequalities for these formulations, and we propose a solution methodology based on sample average approximation and Lagrangian based scenario decomposition. Realistic data sets are then used to perform a detailed computational study involving implementations and analyses of several different configurations of the models. The results from the computational tests indicate that practically implementable truncated versions of the proposed solution algorithm almost always produce very high quality solutions. In the second part, we propose a sampling based stochastic program for a general machine scheduling problem with similar

  12. Idaho National Engineering Laboratory Environmental Restoration Program Schedule Contingency Evaluation Report

    SciTech Connect

    Not Available

    1993-09-01

    This report represents the schedule contingency evaluation done on the FY-93 Major System Acquisition (MSA) Baseline for the Idaho National Engineering Laboratory`s (INEL) Environmental Restoration Program (EPP). A Schedule Contingency Evaluation Team (SCET) was established to evaluate schedule contingency on the MSA Baseline for the INEL ERP associated with completing work within milestones established in the baseline. Baseline schedules had been established considering enforceable deadlines contained in the Federal Facilities Agreement/Consent Order (FFA/CO), the agreement signed in 1992, by the State of Idaho, Department of Health & Welfare, the U.S. Environmental Protection Agency, Region 10, and the U.S. Department of Energy, Idaho Operations Office. The evaluation was based upon the application of standard schedule risk management techniques to the specific problems of the INEL ERP. The schedule contingency evaluation was designed to provided early visibility for potential schedule delays impacting enforceable deadlines. The focus of the analysis was on the duration of time needed to accomplish all required activities to achieve completion of the milestones in the baseline corresponding to the enforceable deadlines. Additionally, the analysis was designed to identify control of high-probability, high-impact schedule risk factors.

  13. FFTF and Advanced Reactors Transition Program Resource Loaded Schedule

    SciTech Connect

    GANTT, D.A.

    2000-10-31

    This Resource Load Schedule (RLS) addresses two missions. The Advanced Reactors Transition (ART) mission, funded by DOE-EM, is to transition assigned, surplus facilities to a safe and compliant, low-cost, stable, deactivated condition (requiring minimal surveillance and maintenance) pending eventual reuse or D&D. Facilities to be transitioned include the 309 Building Plutonium Recycle Test Reactor (PRTR) and Nuclear Energy Legacy facilities. This mission is funded through the Environmental Management (EM) Project Baseline Summary (PBS) RL-TP11, ''Advanced Reactors Transition.'' The second mission, the Fast Flux Test Facility (FFTF) Project, is funded through budget requests submitted to the Office of Nuclear Energy, Science and Technology (DOE-NE). The FFTF Project mission is maintaining the FFTF, the Fuels and Materials Examination Facility (FMEF), and affiliated 400 Area buildings in a safe and compliant standby condition. This mission is to preserve the condition of the plant hardware, software, and personnel in a manner not to preclude a plant restart. This revision of the Resource Loaded Schedule (RLS) is based upon the technical scope in the latest revision of the following project and management plans: Fast Flux Test Facility Standby Plan (Reference 1); Hanford Site Sodium Management Plan (Reference 2); and 309 Building Transition Plan (Reference 4). The technical scope, cost, and schedule baseline is also in agreement with the concurrent revision to the ART Fiscal Year (FY) 2001 Multi-Year Work Plan (MYWP), which is available in an electronic version (only) on the Hanford Local Area Network, within the ''Hanford Data Integrator (HANDI)'' application.

  14. Stratospheric Aerosol and Gas Experiment, SAGE III on ISS, An Earth Science Mission on the International Space Station, Schedule Risk Analysis, A Project Perspective

    NASA Technical Reports Server (NTRS)

    Bonine, Lauren

    2015-01-01

    The presentation provides insight into the schedule risk analysis process used by the Stratospheric Aerosol and Gas Experiment III on the International Space Station Project. The presentation focuses on the schedule risk analysis process highlighting the methods for identification of risk inputs, the inclusion of generic risks identified outside the traditional continuous risk management process, and the development of tailored analysis products used to improve risk informed decision making.

  15. A model for estimating the cost impact of schedule perturbations on aerospace research and development programs

    NASA Technical Reports Server (NTRS)

    Bishop, D. F.

    1972-01-01

    The problem of determining the cost impact attributable to perturbations in an aerospace R and D program schedule is discussed in terms of the diminishing availability of funds. The methodology from which a model is presented for updating R and D cost estimates as a function of perturbations in program time is presented.

  16. Scheduling language and algorithm development study. Volume 2, phase 2: Introduction to plans programming. [user guide

    NASA Technical Reports Server (NTRS)

    Cochran, D. R.; Ishikawa, M. K.; Paulson, R. E.; Ramsey, H. R.

    1975-01-01

    A user guide for the Programming Language for Allocation and Network Scheduling (PLANS) is presented. Information is included for the construction of PLANS programs. The basic philosophy of PLANS is discussed, and access and update reference techniques are described along with the use of tree structures.

  17. 76 FR 73025 - Medicare Program; Payment Policies Under the Physician Fee Schedule, Five-Year Review of Work...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-28

    ... Schedule, Five-Year Review of Work Relative Value Units, Clinical Laboratory Fee Schedule: Signature on... Medicare Program; Payment Policies Under the Physician Fee Schedule, Five-Year Review of Work Relative... public, including any personally identifiable or confidential business information that is included in...

  18. A model program to reduce patient failure to keep scheduled medical appointments.

    PubMed

    Schmalzried, Hans D; Liszak, Joseph

    2012-06-01

    Community health center clinics that rely on scheduled appointments lose revenue and time when patients do not keep their appointments. Various approaches have been used to improve the rate of patient appointments kept. This article provides a model intervention program developed by a quality improvement committee at a Northwest Ohio community health center that is credited with significantly reducing rates of patient failure to keep scheduled medical and dental clinic appointments. The approach of this intervention program is different from others in that it was primarily designed to help patients learn how to become part of the solution to the problem. Community health center staff accomplishes this through engaging patients in a respectful and courteous manner and helping them understand the importance of their involvement in maintaining an efficient scheduling process to benefit all patients. Data collected from outpatient appointment records before and after implementation of the program indicate that missed appointments dropped to less than half the pre-intervention rate.

  19. A vehicle scheduling algorithm using non-serial discrete dynamic programming with space shuttle applications

    NASA Technical Reports Server (NTRS)

    Dupnick, E.

    1973-01-01

    Description of the development and operation of a vehicle-scheduling algorithm which has applications to the NASA problem of assigning payloads to space delivery vehicles. The algorithm is based on a discrete, integer-valued, nonserial, dynamic-programming solution to the classical problem of developing resource utilization plans with limited resources. The algorithm places special emphasis on incorporating interpayload (precedence) relationships; maintaining optimal alternate schedule definitions (a unique feature of dynamic programming) in the event of contingencies (namely, resource inventory changes) without problem resolution; and, by using a special information storage technique, reducing the computational complexity of solving realistic problems.

  20. A Proposed Program for Scheduling, Project Management, Control and Instruction. GEM Bulletin 69-17.

    ERIC Educational Resources Information Center

    Reed, Charles P.

    A computer-oriented filing system is considered necessary to handle the approximately 1,500 students likely to be enrolled in the Georgia model program to train elementary teachers (ED 025 491) by the time it reaches sustained operation. The system of individualized scheduling involves establishing and maintaining a computer storage filing system…

  1. 15 CFR Schedule I to Part 700 - Approved Programs and Delegate Agencies

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 2 2011-01-01 2011-01-01 false Approved Programs and Delegate Agencies I Schedule I to Part 700 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE NATIONAL SECURITY INDUSTRIAL BASE REGULATIONS DEFENSE PRIORITIES...

  2. 15 CFR Schedule I to Part 700 - Approved Programs and Delegate Agencies

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 2 2013-01-01 2013-01-01 false Approved Programs and Delegate Agencies I Schedule I to Part 700 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE NATIONAL SECURITY INDUSTRIAL BASE REGULATIONS DEFENSE PRIORITIES...

  3. 15 CFR Schedule I to Part 700 - Approved Programs and Delegate Agencies

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 2 2012-01-01 2012-01-01 false Approved Programs and Delegate Agencies I Schedule I to Part 700 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE NATIONAL SECURITY INDUSTRIAL BASE REGULATIONS DEFENSE PRIORITIES...

  4. Creation of the selection list for the Experiment Scheduling Program (ESP)

    NASA Technical Reports Server (NTRS)

    Deuermeyer, B. L.; Shannon, R. E.; Underbrink, A. J., Jr.

    1986-01-01

    The efforts to develop a procedure to construct selection groups to augment the Experiment Scheduling Program (ESP) are summarized. Included is a User's Guide and a sample scenario to guide in the use of the software system that implements the developed procedures.

  5. Automatic programming via iterated local search for dynamic job shop scheduling.

    PubMed

    Nguyen, Su; Zhang, Mengjie; Johnston, Mark; Tan, Kay Chen

    2015-01-01

    Dispatching rules have been commonly used in practice for making sequencing and scheduling decisions. Due to specific characteristics of each manufacturing system, there is no universal dispatching rule that can dominate in all situations. Therefore, it is important to design specialized dispatching rules to enhance the scheduling performance for each manufacturing environment. Evolutionary computation approaches such as tree-based genetic programming (TGP) and gene expression programming (GEP) have been proposed to facilitate the design task through automatic design of dispatching rules. However, these methods are still limited by their high computational cost and low exploitation ability. To overcome this problem, we develop a new approach to automatic programming via iterated local search (APRILS) for dynamic job shop scheduling. The key idea of APRILS is to perform multiple local searches started with programs modified from the best obtained programs so far. The experiments show that APRILS outperforms TGP and GEP in most simulation scenarios in terms of effectiveness and efficiency. The analysis also shows that programs generated by APRILS are more compact than those obtained by genetic programming. An investigation of the behavior of APRILS suggests that the good performance of APRILS comes from the balance between exploration and exploitation in its search mechanism. PMID:24802623

  6. Automatic programming via iterated local search for dynamic job shop scheduling.

    PubMed

    Nguyen, Su; Zhang, Mengjie; Johnston, Mark; Tan, Kay Chen

    2015-01-01

    Dispatching rules have been commonly used in practice for making sequencing and scheduling decisions. Due to specific characteristics of each manufacturing system, there is no universal dispatching rule that can dominate in all situations. Therefore, it is important to design specialized dispatching rules to enhance the scheduling performance for each manufacturing environment. Evolutionary computation approaches such as tree-based genetic programming (TGP) and gene expression programming (GEP) have been proposed to facilitate the design task through automatic design of dispatching rules. However, these methods are still limited by their high computational cost and low exploitation ability. To overcome this problem, we develop a new approach to automatic programming via iterated local search (APRILS) for dynamic job shop scheduling. The key idea of APRILS is to perform multiple local searches started with programs modified from the best obtained programs so far. The experiments show that APRILS outperforms TGP and GEP in most simulation scenarios in terms of effectiveness and efficiency. The analysis also shows that programs generated by APRILS are more compact than those obtained by genetic programming. An investigation of the behavior of APRILS suggests that the good performance of APRILS comes from the balance between exploration and exploitation in its search mechanism.

  7. 78 FR 41785 - Agency Information Collection Activities; Comment Request; Implementation of Title I/II Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-11

    ... Agency Information Collection Activities; Comment Request; Implementation of Title I/II Program... notice will be considered public records. Title of Collection: Implementation of Title I/II Program... Estimated Number of Annual Burden Hours: 6,573. Abstract: The Implementation of Title I/II...

  8. Master schedule for CY-1983 Hanford environmental surveillance routine sampling program

    SciTech Connect

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.; Dirkes, R.L.

    1982-12-01

    The current schedule of data collection for the routine Hanford environmental surveillance and ground-water monitoring programs at the Hanford Site is presented. The purpose of the programs is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs. Radiological monitoring data are reported for air (particulate filter and gases/vapor), Columbia River water, sanitary water, onsite pond water, foodstuffs (whole milk, leafy vegetables, fruit, wheat/alfalfa, beef, poultry/eggs), wildlife, soil and vegetation, and direct radiation. Information is also given for on site radiation control audit surveys (roadway, railway, aerial, and waste disposal sites, and the Hanford ground-water monitoring program.

  9. The JUPITER-III Program: ANL analysis of ZPPR-17

    SciTech Connect

    Brumbach, S.B.; Collins, P.J.; Grasseschi, G.L.; Schaefer, R.W.; Brumbach, S.B.; Collins, P.J.; Grasseschi, G.L.; Schaefer, R.W.

    1989-01-31

    The ZPPR-17 assembly was part of the JUPITER-III cooperative program between the US DOE and PNC of Japan. The assembly was designed to study the neutronic behavior of a large, axially heterogeneous, liquid-metal-cooled reactor. The unique feature of the assembly was an internal blanket region in the axial center of the core extending two-thirds of the core radius. Assembly variants with 25 control rod positions and with 13 half-inserted control rods were built. This report describes in detail the results of measurements and analyses of ZPPR-17. The measurements emphasized reaction rate distributions, and gamma dose measurements were included. Additional measurements were control worth, sodium void worth, and reactivity coefficients associated with small material motions in assembly expansion and bowing.

  10. Scheduling Software

    NASA Technical Reports Server (NTRS)

    1993-01-01

    Advanced Scheduling Environment is a software product designed and marketed by AVYX, Inc. to provide scheduling solutions for complex manufacturing environments. It can be adapted to specific scheduling and manufacturing processes and has led to substantial cost savings. The system was originally developed for NASA use in scheduling Space Shuttle flights and satellite activities. AVYX, Inc. is an offshoot of a company formed to provide computer-related services to NASA. TREES-plus, the company's initial product became the programming language for the advanced scheduling environment system.

  11. Fair Energy Scheduling for Vehicle-to-Grid Networks Using Adaptive Dynamic Programming.

    PubMed

    Xie, Shengli; Zhong, Weifeng; Xie, Kan; Yu, Rong; Zhang, Yan

    2016-08-01

    Research on the smart grid is being given enormous supports worldwide due to its great significance in solving environmental and energy crises. Electric vehicles (EVs), which are powered by clean energy, are adopted increasingly year by year. It is predictable that the huge charge load caused by high EV penetration will have a considerable impact on the reliability of the smart grid. Therefore, fair energy scheduling for EV charge and discharge is proposed in this paper. By using the vehicle-to-grid technology, the scheduler controls the electricity loads of EVs considering fairness in the residential distribution network. We propose contribution-based fairness, in which EVs with high contributions have high priorities to obtain charge energy. The contribution value is defined by both the charge/discharge energy and the timing of the action. EVs can achieve higher contribution values when discharging during the load peak hours. However, charging during this time will decrease the contribution values seriously. We formulate the fair energy scheduling problem as an infinite-horizon Markov decision process. The methodology of adaptive dynamic programming is employed to maximize the long-term fairness by processing online network training. The numerical results illustrate that the proposed EV energy scheduling is able to mitigate and flatten the peak load in the distribution network. Furthermore, contribution-based fairness achieves a fast recovery of EV batteries that have deeply discharged and guarantee fairness in the full charge time of all EVs.

  12. Fair Energy Scheduling for Vehicle-to-Grid Networks Using Adaptive Dynamic Programming.

    PubMed

    Xie, Shengli; Zhong, Weifeng; Xie, Kan; Yu, Rong; Zhang, Yan

    2016-08-01

    Research on the smart grid is being given enormous supports worldwide due to its great significance in solving environmental and energy crises. Electric vehicles (EVs), which are powered by clean energy, are adopted increasingly year by year. It is predictable that the huge charge load caused by high EV penetration will have a considerable impact on the reliability of the smart grid. Therefore, fair energy scheduling for EV charge and discharge is proposed in this paper. By using the vehicle-to-grid technology, the scheduler controls the electricity loads of EVs considering fairness in the residential distribution network. We propose contribution-based fairness, in which EVs with high contributions have high priorities to obtain charge energy. The contribution value is defined by both the charge/discharge energy and the timing of the action. EVs can achieve higher contribution values when discharging during the load peak hours. However, charging during this time will decrease the contribution values seriously. We formulate the fair energy scheduling problem as an infinite-horizon Markov decision process. The methodology of adaptive dynamic programming is employed to maximize the long-term fairness by processing online network training. The numerical results illustrate that the proposed EV energy scheduling is able to mitigate and flatten the peak load in the distribution network. Furthermore, contribution-based fairness achieves a fast recovery of EV batteries that have deeply discharged and guarantee fairness in the full charge time of all EVs. PMID:26930694

  13. Integrating an HTLV-III Screening Program into a Community Based Family Health Service Agency.

    ERIC Educational Resources Information Center

    Klausmeier, Walter W.; Henshaw, Beverly

    Acquired Immune Deficiency Syndrome (AIDS) has become one of the most serious epidemic disease problems in recent years. In 1985 the Public Health Service recommended establishment of test sites where individuals might be tested for Human T Lymphotropic Virus III (HTLV-III) antibody. An HTLV-III antibody screening program was integrated into a…

  14. The Swift Project Contamination Control Program: A Case Study of Balancing Cost, Schedule and Risk

    NASA Technical Reports Server (NTRS)

    Hansen, Patricia A.; Day, Diane T.; Secunda, Mark S.; Rosecrans, Glenn P.

    2004-01-01

    The Swift Observatory will be launched in early 2004 to examine the dynamic process of gamma ray burst (GRB) events. The multi-wavelength Observatory will study the GRB afterglow characteristics, which will help to answer fundamental questions about both the structure and the evolution of the universe. The Swift Observatory Contamination Control Program has been developed to aid in ensuring the success of the on-orbit performance of two of the primary instruments: the Ultraviolet and Optical Telescope (UVOT) and the X-Ray Telescope (XRT). During the design phase of the Observatory, the contamination control program evolved and trade studies were performed to assess the risk of contaminating the sensitive UVOT and XRT optics during both pre-launch testing and on-orbit operations, within the constraints of the overall program cost and schedule.

  15. The Swift Project Contamination Control Program: A Case study of Balancing Cost, Schedule and Risk

    NASA Technical Reports Server (NTRS)

    Hansen, Patricia A.; Day, Diane; Secunda, Mark

    2003-01-01

    The Swift Observatory will be launched in early 2004 to examine the dynamic process of gamma ray burst (GRB) events. The multi-wavelength Observatory will study the GRB afterglow characteristics, which will help to answer fundamental questions about both the structure and the evolution of the universe. The Swift Observatory Contamination Control Program has been developed to aid in ensuring the success of the on-orbit performance of two of the primary instruments: the Ultraviolet and Optical Telescope (UVOT) and the X-Ray Telescope (XRT). During the design phase of the Observatory, the contamination control program evolved and trade studies were performed to assess the risk of contaminating the sensitive UVOT and XRT optics during both pre-launch testing and on-orbit operations, within the constraints of the overall program cost and schedule.

  16. Prioritized schedule for review of industrial safety and occupational health programs

    SciTech Connect

    1996-12-01

    This document provides the rationale and criteria for developing a schedule for reviewing the Industrial Safety and Occupational Health programs for the Management and Operating Contractor (MOC) of the Waste Isolation Pilot Plant. The reviews will evaluate the MOC`s compliance with applicable Department of Energy (DOE) orders and regulatory requirements. The scope of this task includes developing prioritization criteria, determining the review priority of each program based upon the criteria, identifying review requirements for each program, and preparing a detailed review schedule. In keeping with the Carlsbad Area Office (CAO) structure for the review of site activities, these review activities will be addressed as surveillances, although the original basis for this requirement refers to these activities as appraisals. Surveillances and appraisals are the same within this document. Surveillances are defined as: ``The act of monitoring or observing to verify whether an item, activity, system, or process conforms to specified requirements. Surveillance of a technical work activity is normally done in real time, i.e., the surveillance is accomplished as the work is being performed.``

  17. A Two-Stage Stochastic Mixed-Integer Programming Approach to the Smart House Scheduling Problem

    NASA Astrophysics Data System (ADS)

    Ozoe, Shunsuke; Tanaka, Yoichi; Fukushima, Masao

    A “Smart House” is a highly energy-optimized house equipped with photovoltaic systems (PV systems), electric battery systems, fuel cell cogeneration systems (FC systems), electric vehicles (EVs) and so on. Smart houses are attracting much attention recently thanks to their enhanced ability to save energy by making full use of renewable energy and by achieving power grid stability despite an increased power draw for installed PV systems. Yet running a smart house's power system, with its multiple power sources and power storages, is no simple task. In this paper, we consider the problem of power scheduling for a smart house with a PV system, an FC system and an EV. We formulate the problem as a mixed integer programming problem, and then extend it to a stochastic programming problem involving recourse costs to cope with uncertain electricity demand, heat demand and PV power generation. Using our method, we seek to achieve the optimal power schedule running at the minimum expected operation cost. We present some results of numerical experiments with data on real-life demands and PV power generation to show the effectiveness of our method.

  18. Fuzzy linear programming based optimal fuel scheduling incorporating blending/transloading facilities

    SciTech Connect

    Djukanovic, M.; Babic, B.; Milosevic, B.; Sobajic, D.J.; Pao, Y.H. |

    1996-05-01

    In this paper the blending/transloading facilities are modeled using an interactive fuzzy linear programming (FLP), in order to allow the decision-maker to solve the problem of uncertainty of input information within the fuel scheduling optimization. An interactive decision-making process is formulated in which decision-maker can learn to recognize good solutions by considering all possibilities of fuzziness. The application of the fuzzy formulation is accompanied by a careful examination of the definition of fuzziness, appropriateness of the membership function and interpretation of results. The proposed concept provides a decision support system with integration-oriented features, whereby the decision-maker can learn to recognize the relative importance of factors in the specific domain of optimal fuel scheduling (OFS) problem. The formulation of a fuzzy linear programming problem to obtain a reasonable nonfuzzy solution under consideration of the ambiguity of parameters, represented by fuzzy numbers, is introduced. An additional advantage of the FLP formulation is its ability to deal with multi-objective problems.

  19. 40 CFR 147.1401 - State administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Injection and Mineral Production Wells, Effective Date: February 16, 1982, Amended Dates: November 12, 1983..., III, IV and V wells. 147.1401 Section 147.1401 Protection of Environment ENVIRONMENTAL PROTECTION... CONTROL PROGRAMS Nebraska § 147.1401 State administered program—Class I, III, IV and V wells. The...

  20. 40 CFR 147.1401 - State administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Injection and Mineral Production Wells, Effective Date: February 16, 1982, Amended Dates: November 12, 1983..., III, IV and V wells. 147.1401 Section 147.1401 Protection of Environment ENVIRONMENTAL PROTECTION... CONTROL PROGRAMS Nebraska § 147.1401 State administered program—Class I, III, IV and V wells. The...

  1. 40 CFR 147.1401 - State administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Injection and Mineral Production Wells, Effective Date: February 16, 1982, Amended Dates: November 12, 1983..., III, IV and V wells. 147.1401 Section 147.1401 Protection of Environment ENVIRONMENTAL PROTECTION... CONTROL PROGRAMS Nebraska § 147.1401 State administered program—Class I, III, IV and V wells. The...

  2. 40 CFR 147.1401 - State administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Injection and Mineral Production Wells, Effective Date: February 16, 1982, Amended Dates: November 12, 1983..., III, IV and V wells. 147.1401 Section 147.1401 Protection of Environment ENVIRONMENTAL PROTECTION... CONTROL PROGRAMS Nebraska § 147.1401 State administered program—Class I, III, IV and V wells. The...

  3. 40 CFR 147.1401 - State administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Injection and Mineral Production Wells, Effective Date: February 16, 1982, Amended Dates: November 12, 1983..., III, IV and V wells. 147.1401 Section 147.1401 Protection of Environment ENVIRONMENTAL PROTECTION... CONTROL PROGRAMS Nebraska § 147.1401 State administered program—Class I, III, IV and V wells. The...

  4. A Mixed Integer Linear Program for Solving a Multiple Route Taxi Scheduling Problem

    NASA Technical Reports Server (NTRS)

    Montoya, Justin Vincent; Wood, Zachary Paul; Rathinam, Sivakumar; Malik, Waqar Ahmad

    2010-01-01

    Aircraft movements on taxiways at busy airports often create bottlenecks. This paper introduces a mixed integer linear program to solve a Multiple Route Aircraft Taxi Scheduling Problem. The outputs of the model are in the form of optimal taxi schedules, which include routing decisions for taxiing aircraft. The model extends an existing single route formulation to include routing decisions. An efficient comparison framework compares the multi-route formulation and the single route formulation. The multi-route model is exercised for east side airport surface traffic at Dallas/Fort Worth International Airport to determine if any arrival taxi time savings can be achieved by allowing arrivals to have two taxi routes: a route that crosses an active departure runway and a perimeter route that avoids the crossing. Results indicate that the multi-route formulation yields reduced arrival taxi times over the single route formulation only when a perimeter taxiway is used. In conditions where the departure aircraft are given an optimal and fixed takeoff sequence, accumulative arrival taxi time savings in the multi-route formulation can be as high as 3.6 hours more than the single route formulation. If the departure sequence is not optimal, the multi-route formulation results in less taxi time savings made over the single route formulation, but the average arrival taxi time is significantly decreased.

  5. SELENIUM TREATMENT/REMOVAL ALTERNATIVES DEMONSTRATION PROJECT - MINE WASTE TECHNOLOGY PROGRAM ACTIVITY III, PROJECT 20

    EPA Science Inventory

    This document is the final report for EPA's Mine WAste Technology Program (MWTP) Activity III, Project 20--Selenium Treatment/Removal Alternatives Demonstration project. Selenium contamination originates from many sources including mining operations, mineral processing, abandoned...

  6. 25 CFR 36.12 - Standard III-Program needs assessment.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Program Evaluation. This assessment shall include at least the following: (a) A clear statement of student... data developed as a result of the evaluation outlined in § 36.50 School Program Evaluation. (c) A... 25 Indians 1 2014-04-01 2014-04-01 false Standard III-Program needs assessment. 36.12 Section...

  7. 25 CFR 36.12 - Standard III-Program needs assessment.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Program Evaluation. This assessment shall include at least the following: (a) A clear statement of student... data developed as a result of the evaluation outlined in § 36.50 School Program Evaluation. (c) A... 25 Indians 1 2013-04-01 2013-04-01 false Standard III-Program needs assessment. 36.12 Section...

  8. 25 CFR 36.12 - Standard III-Program needs assessment.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Program Evaluation. This assessment shall include at least the following: (a) A clear statement of student... data developed as a result of the evaluation outlined in § 36.50 School Program Evaluation. (c) A... 25 Indians 1 2010-04-01 2010-04-01 false Standard III-Program needs assessment. 36.12 Section...

  9. 25 CFR 36.12 - Standard III-Program needs assessment.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Program Evaluation. This assessment shall include at least the following: (a) A clear statement of student... data developed as a result of the evaluation outlined in § 36.50 School Program Evaluation. (c) A... 25 Indians 1 2012-04-01 2011-04-01 true Standard III-Program needs assessment. 36.12 Section...

  10. 25 CFR 36.12 - Standard III-Program needs assessment.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Program Evaluation. This assessment shall include at least the following: (a) A clear statement of student... data developed as a result of the evaluation outlined in § 36.50 School Program Evaluation. (c) A... 25 Indians 1 2011-04-01 2011-04-01 false Standard III-Program needs assessment. 36.12 Section...

  11. Scheduling and programming of rapid finger sequences: tests and elaborations of the hierarchical editor model.

    PubMed

    Rosenbaum, D A; Hindorff, V; Munro, E M

    1987-05-01

    Is a response sequence executed only after the sequence has been fully programmed, as discrete processing models predict, or does execution begin before programming has been completed, as continuous processing models predict? To address this issue, we tested a discrete processing model of human motor performance, the hierarchical editor model of Rosenbaum, Inhoff, and Gordon (1984). This model was developed to account for data from experiments in which people perform one of two possible finger sequences, depending on the identity of a choice signal. The model assumes a hierarchically organized motor program that is first "edited" to resolve any uncertainties and is then "executed" to produce the desired responses. Three experiments reported here show that, contrary to the model's predictions and some well-known motor programming results (Sternberg, Monsell, Knoll, & Wright, 1978), the reaction time to begin a response sequence actually decreases with the length of the sequence under some choice conditions. We account for these results with a model that allows execution to begin while editing is still in progress. A key assumption in the model is that subjects schedule execution so that means and variances of interresponse times are minimized.

  12. QoS Differential Scheduling in Cognitive-Radio-Based Smart Grid Networks: An Adaptive Dynamic Programming Approach.

    PubMed

    Yu, Rong; Zhong, Weifeng; Xie, Shengli; Zhang, Yan; Zhang, Yun

    2016-02-01

    As the next-generation power grid, smart grid will be integrated with a variety of novel communication technologies to support the explosive data traffic and the diverse requirements of quality of service (QoS). Cognitive radio (CR), which has the favorable ability to improve the spectrum utilization, provides an efficient and reliable solution for smart grid communications networks. In this paper, we study the QoS differential scheduling problem in the CR-based smart grid communications networks. The scheduler is responsible for managing the spectrum resources and arranging the data transmissions of smart grid users (SGUs). To guarantee the differential QoS, the SGUs are assigned to have different priorities according to their roles and their current situations in the smart grid. Based on the QoS-aware priority policy, the scheduler adjusts the channels allocation to minimize the transmission delay of SGUs. The entire transmission scheduling problem is formulated as a semi-Markov decision process and solved by the methodology of adaptive dynamic programming. A heuristic dynamic programming (HDP) architecture is established for the scheduling problem. By the online network training, the HDP can learn from the activities of primary users and SGUs, and adjust the scheduling decision to achieve the purpose of transmission delay minimization. Simulation results illustrate that the proposed priority policy ensures the low transmission delay of high priority SGUs. In addition, the emergency data transmission delay is also reduced to a significantly low level, guaranteeing the differential QoS in smart grid.

  13. Issues in NASA Program and Project Management: Focus on Project Planning and Scheduling

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics addressed include: Planning and scheduling training for working project teams at NASA, overview of project planning and scheduling workshops, project planning at NASA, new approaches to systems engineering, software reliability assessment, and software reuse in wind tunnel control systems.

  14. BASIC Simulation Programs; Volumes III and IV. Mathematics, Physics.

    ERIC Educational Resources Information Center

    Digital Equipment Corp., Maynard, MA.

    The computer programs presented here were developed as a part of the Huntington Computer Project. They were tested on a Digital Equipment Corporation TSS-8 time-shared computer and run in a version of BASIC. Mathematics and physics programs are presented in this volume. The 20 mathematics programs include ones which review multiplication skills;…

  15. A methodology for the evaluation of program cost and schedule risk for the SEASAT program

    NASA Technical Reports Server (NTRS)

    Abram, P.; Myers, D.

    1976-01-01

    An interactive computerized project management software package (RISKNET) is designed to analyze the effect of the risk involved in each specific activity on the results of the total SEASAT-A program. Both the time and the cost of each distinct activity can be modeled with an uncertainty interval so as to provide the project manager with not only the expected time and cost for the completion of the total program, but also with the expected range of costs corresponding to any desired level of significance. The nature of the SEASAT-A program is described. The capabilities of RISKNET and the implementation plan of a RISKNET analysis for the development of SEASAT-A are presented.

  16. Programs for Infants and Young Children. Part III: Health.

    ERIC Educational Resources Information Center

    Appalachian Regional Commission, Washington, DC.

    Directed toward the improvement of health care for mothers and young children, this report describes a number of comprehensive programs focused on health and reports on projects which have singled out one or more specific maternal or child health services. Included are descriptions of existing community programs for pregnant schoolgirls, health…

  17. Computing environments for data analysis III: Programming environments

    SciTech Connect

    McDonald, J.A.; Pedersen, J.

    1988-03-01

    This is the third in a series of papers on aspects of modern computing environments that are relevant to statistical data analysis. In this paper the authors discuss programming environments. In particular, they argue that integrated programming environments (for example, Lisp and Smalltalk environments) are more appropriate as a base for data analysis than conventional operating systems (for example, Unix).

  18. DOE-EPRI distributed wind Turbine Verification Program (TVP III)

    SciTech Connect

    McGowin, C.; DeMeo, E.; Calvert, S.

    1997-12-31

    In 1992, the Electric Power Research Institute (EPRI) and the U.S. Department of Energy (DOE) initiated the Utility Wind Turbine Verification Program (TVP). The goal of the program is to evaluate prototype advanced wind turbines at several sites developed by U.S. electric utility companies. Two six MW wind projects have been installed under the TVP program by Central and South West Services in Fort Davis, Texas and Green Mountain Power Corporation in Searsburg, Vermont. In early 1997, DOE and EPRI selected five more utility projects to evaluate distributed wind generation using smaller {open_quotes}clusters{close_quotes} of wind turbines connected directly to the electricity distribution system. This paper presents an overview of the objectives, scope, and status of the EPRI-DOE TVP program and the existing and planned TVP projects.

  19. A Second Year Evaluation of the ESEA Title III Urban Leadership Program.

    ERIC Educational Resources Information Center

    Frerichs, Allen H.

    The Urban Leadership Program, funded under Title III of the Elementary and Secondary Education Act, was carried out among sixth graders at the Albert Einstein School in Chicago, Illinois. The primary purpose of the program was to develop skills and competence to prepare participants for survival and success in a large urban environment. A…

  20. Aspects of job scheduling

    NASA Technical Reports Server (NTRS)

    Phillips, K.

    1976-01-01

    A mathematical model for job scheduling in a specified context is presented. The model uses both linear programming and combinatorial methods. While designed with a view toward optimization of scheduling of facility and plant operations at the Deep Space Communications Complex, the context is sufficiently general to be widely applicable. The general scheduling problem including options for scheduling objectives is discussed and fundamental parameters identified. Mathematical algorithms for partitioning problems germane to scheduling are presented.

  1. Evaluation Report III: The Robert Noyce Scholarship Program at CSUB

    ERIC Educational Resources Information Center

    Wang, Jianjun

    2013-01-01

    California State University, Bakersfield (CSUB) received funding from National Science Foundation's (NSF) Robert Noyce Teacher Scholarship Program to recruit Noyce Scholars from upper-division science, technology, engineering, and mathematics (STEM) majors, graduate students, and professionals switched to STEM teaching from other fields (NSF…

  2. Hawaii Integrated Biofuels Research Program: Final Subcontract Report, Phase III

    SciTech Connect

    Not Available

    1992-05-01

    This report is a compilation of studies done to develop an integrated set of strategies for the production of energy from renewable resources in Hawaii. Because of the close coordination between this program and other ongoing DOE research, the work will have broad-based applicability to the entire United States.

  3. Guidelines for Program Development, Special Education, Volume III.

    ERIC Educational Resources Information Center

    Texas Education Agency, Austin.

    The Texas public school program for the minimally brain injured is outlined; guidelines are provided for screening, identifying, and evaluating the brain injured. The development of interpersonal relationships is described, with suggestions given for establishing behavioral controls and for conducting parent conferences and counseling; the…

  4. A Constraint Integer Programming Approach for Resource-Constrained Project Scheduling

    NASA Astrophysics Data System (ADS)

    Berthold, Timo; Heinz, Stefan; Lübbecke, Marco E.; Möhring, Rolf H.; Schulz, Jens

    We propose a hybrid approach for solving the resource-constrained project scheduling problem which is an extremely hard to solve combinatorial optimization problem of practical relevance. Jobs have to be scheduled on (renewable) resources subject to precedence constraints such that the resource capacities are never exceeded and the latest completion time of all jobs is minimized.

  5. School Bus Routing and Scheduling: When to Use Computer-Assisted Methods and Programs.

    ERIC Educational Resources Information Center

    Walcott, Wayne; And Others

    1986-01-01

    Discusses issues concerning the use of computers in school bus scheduling and routing. Examines the advantages, technical considerations, and costs of changing to a computerized system. Offers a five-point approach toward implementation and includes a table of comparative data for routing and scheduling models for a typical school bus fleet. (IW)

  6. QoS Differential Scheduling in Cognitive-Radio-Based Smart Grid Networks: An Adaptive Dynamic Programming Approach.

    PubMed

    Yu, Rong; Zhong, Weifeng; Xie, Shengli; Zhang, Yan; Zhang, Yun

    2016-02-01

    As the next-generation power grid, smart grid will be integrated with a variety of novel communication technologies to support the explosive data traffic and the diverse requirements of quality of service (QoS). Cognitive radio (CR), which has the favorable ability to improve the spectrum utilization, provides an efficient and reliable solution for smart grid communications networks. In this paper, we study the QoS differential scheduling problem in the CR-based smart grid communications networks. The scheduler is responsible for managing the spectrum resources and arranging the data transmissions of smart grid users (SGUs). To guarantee the differential QoS, the SGUs are assigned to have different priorities according to their roles and their current situations in the smart grid. Based on the QoS-aware priority policy, the scheduler adjusts the channels allocation to minimize the transmission delay of SGUs. The entire transmission scheduling problem is formulated as a semi-Markov decision process and solved by the methodology of adaptive dynamic programming. A heuristic dynamic programming (HDP) architecture is established for the scheduling problem. By the online network training, the HDP can learn from the activities of primary users and SGUs, and adjust the scheduling decision to achieve the purpose of transmission delay minimization. Simulation results illustrate that the proposed priority policy ensures the low transmission delay of high priority SGUs. In addition, the emergency data transmission delay is also reduced to a significantly low level, guaranteeing the differential QoS in smart grid. PMID:25910254

  7. 40 CFR 147.1850 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... CONTROL PROGRAMS Oklahoma § 147.1850 State-administered program—Class I, III, IV and V wells. The UIC program for Class I, III, IV, and V wells in the State of Oklahoma, except those on Indian lands, is the program administered by the Oklahoma State Department of Health, approved by EPA pursuant to SDWA...

  8. 40 CFR 147.1850 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CONTROL PROGRAMS Oklahoma § 147.1850 State-administered program—Class I, III, IV and V wells. The UIC program for Class I, III, IV, and V wells in the State of Oklahoma, except those on Indian lands, is the program administered by the Oklahoma State Department of Health, approved by EPA pursuant to SDWA...

  9. 40 CFR 147.1850 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CONTROL PROGRAMS Oklahoma § 147.1850 State-administered program—Class I, III, IV and V wells. The UIC program for Class I, III, IV, and V wells in the State of Oklahoma, except those on Indian lands, is the program administered by the Oklahoma State Department of Health, approved by EPA pursuant to SDWA...

  10. 40 CFR 147.1850 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CONTROL PROGRAMS Oklahoma § 147.1850 State-administered program—Class I, III, IV and V wells. The UIC program for Class I, III, IV, and V wells in the State of Oklahoma, except those on Indian lands, is the program administered by the Oklahoma State Department of Health, approved by EPA pursuant to SDWA...

  11. 40 CFR 147.1601 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CONTROL PROGRAMS New Mexico § 147.1601 State-administered program—Class I, III, IV and V wells. The UIC program for Class I, III, IV and V injection wells in the State of New Mexico, except for those on Indian lands, is the program administered by the New Mexico Water Quality Control Commission, the...

  12. CHAP III- CHARRING ABLATOR PROGRAM FOR ADVANCED INVESTIGATION OF THERMAL PROTECTION SYSTEMS FOR ENTRY

    NASA Technical Reports Server (NTRS)

    Stroud, C. W.

    1994-01-01

    The transient response of a thermal protection material to heat applied to the surface can be calculated using the CHAP III computer program. CHAP III can be used to analyze pyrolysis gas chemical kinetics in detail and examine pyrolysis reactions-indepth. The analysis includes the deposition of solid products produced by chemical reactions in the gas phase. CHAP III uses a modelling technique which can approximate a wide range of ablation problems. The energy equation used in CHAP III incorporates pyrolysis (both solid and gas reactions), convection, conduction, storage, work, kinetic energy, and viscous dissipation. The chemically reacting components of the solid are allowed to vary as a function of position and time. CHAP III employs a finite difference method to approximate the energy equations. Input values include specific heat, thermal conductivity, thermocouple locations, enthalpy, heating rates, and a description of the chemical reactions expected. The output tabulates the temperature at locations throughout the ablator, gas flow within the solid, density of the solid, weight of pyrolysis gases, and rate of carbon deposition. A sample case is included, which analyzes an ablator material containing several pyrolysis reactions subjected to an environment typical of entry at lunar return velocity. CHAP III is written in FORTRAN IV for batch execution and has been implemented on a CDC CYBER 170 series computer operating under NOS with a central memory requirement of approximately 102K (octal) of 60 bit words. This program was developed in 1985.

  13. Lick Northern Proper Motion Program. III. Lick NPM2 Catalog

    NASA Astrophysics Data System (ADS)

    Hanson, Robert B.; Klemola, Arnold R.; Jones, Burton F.; Monet, David G.

    2004-09-01

    The Lick Northern Proper Motion (NPM) program, a two-epoch (1947-1988) photographic survey of the northern two-thirds of the sky (δ>~-23deg), has measured absolute proper motions, on an inertial system defined by distant galaxies, for 378,360 stars in the magnitude range 8<~B<~18. The 1993 NPM1 Catalog contains 148,940 stars in 899 fields outside the Milky Way's zone of avoidance. The 2003 NPM2 Catalog contains 232,062 stars in the remaining 347 NPM fields near the plane of the Milky Way. This paper describes the NPM2 star selection, plate measurements, astrometric and photometric data reductions, and catalog compilation. The NPM2 Catalog contains 122,806 faint (B>=14) anonymous stars for astrometry and Galactic studies, 91,648 bright (B<14) positional reference stars, and 34,868 ``special stars'' chosen for astrophysical interest. The NPM2 proper motions are on the ICRS system, via Tycho-2 stars, to an accuracy of 0.6 mas yr-1 in each field. The rms proper-motion precision is 6 mas yr-1. Positional errors average 80 mas at the mean plate epoch 1968, and 200 mas at the NPM2 catalog epoch 2000. NPM2 photographic photometry errors average 0.18 mag in B and 0.20 mag in B-V. The NPM2 Catalog and the updated (to J2000.0) NPM1 Catalog are available at the CDS Strasbourg data center and on the NPM Web site. The NPM2 Catalog completes the Lick Northern Proper Motion program after a half-century of work by three generations of Lick Observatory astronomers. The NPM Catalogs will serve as a database for research in Galactic structure, stellar kinematics, and astrometry.

  14. Program for Infant/Toddler Caregivers. Trainer's Manual, Module III: Learning and Development.

    ERIC Educational Resources Information Center

    Signer, Sheila M., Ed.; Wright, Sylvia Stein, Ed.

    This trainer's manual covers module III of the Program for Infant/Toddler Caregivers (PITC), a four-module video training course for providers of family and center day care. The manual is intended to be used by module instructors and includes an overview of the PITC and instructions for using the manual and its accompanying videos. The module…

  15. Sequential Mathematics Course III. Volume One. Staff Development Program 1986-1987.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Div. of Curriculum and Instruction.

    The Sequential Mathematics Sequence provides students with an integrated course of study, including lessons which interweave algebra, geometry, logic, probability, and mathematical systems. This handbook is designed to meet the needs of teachers who will be teaching Course III in the sequence. The handbook, for use with staff development programs,…

  16. Revenues & Expenses, 2004-2009. NCAA[R] Division III Intercollegiate Athletics Programs Report

    ERIC Educational Resources Information Center

    Fulks, Daniel L., Comp.

    2010-01-01

    This report provides summary information concerning revenues and expenses of the National Collegiate Athletic Association (NCAA) Division III athletics programs for the fiscal years 2004 through 2009. It is the result of surveys conducted during the fall of each of those years. Although similar studies have been conducted for the NCAA since 1969,…

  17. Turning Over Turnover: The Evaluation of a Staff Scheduling System in a Community-Based Program for Adults with Developmental Disabilities

    ERIC Educational Resources Information Center

    Strouse, Michael C.; Carroll-Hernandez, Tammy A.; Sherman, James A.; Sheldon, Jan B.

    2004-01-01

    Human service programs often have major problems ensuring that all direct-care staff positions are filled and keeping staff members after they are hired. Work schedules may have an effect on maintaining the longevity of staff. The purpose of this study was to evaluate the effects of a revised direct-care staff-scheduling system in community homes…

  18. Flexible Scheduling.

    ERIC Educational Resources Information Center

    Davis, Harold S.; Bechard, Joseph E.

    A flexible schedule allows teachers to change group size, group composition, and class length according to the purpose of the lesson. This pamphlet presents various "master" schedules for flexible scheduling: (1) Simple block schedules, (2) back-to-back schedules, (3) interdisciplinary schedules, (4) school-wide block schedules, (5) open-lab…

  19. 78 FR 65621 - Implementation of Title I/II Program Initiatives; Extension of Public Comment Period; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF EDUCATION Implementation of Title I/II Program Initiatives; Extension of Public Comment Period; Correction AGENCY... comment for an information collection entitled, ``Implementation of Title I/II Program...

  20. The National Heart, Lung, and Blood Institute Recipient Epidemiology and Donor Evaluation Study (REDS-III): A research program striving to improve blood donor and transfusion recipient outcomes

    PubMed Central

    Kleinman, Steven; Busch, Michael P; Murphy, Edward L; Shan, Hua; Ness, Paul; Glynn, Simone A.

    2014-01-01

    Background The Recipient Epidemiology and Donor Evaluation Study -III (REDS-III) is a 7-year multicenter transfusion safety research initiative launched in 2011 by the National Heart, Lung, and Blood Institute. Study design The domestic component involves 4 blood centers, 12 hospitals, a data coordinating center, and a central laboratory. The international component consists of distinct programs in Brazil, China, and South Africa which involve US and in-country investigators. Results REDS-III is using two major methods to address key research priorities in blood banking/transfusion medicine. First, there will be numerous analyses of large “core” databases; the international programs have each constructed a donor/donation database while the domestic program has established a detailed research database that links data from blood donors and their donations, the components made from these donations, and data extracts from the electronic medical records of the recipients of these components. Secondly, there are more than 25 focused research protocols involving transfusion recipients, blood donors, or both that are either in progress or scheduled to begin within the next 3 years. Areas of study include transfusion epidemiology and blood utilization; transfusion outcomes; non-infectious transfusion risks; HIV-related safety issues (particularly in the international programs); emerging infectious agents; blood component quality; donor health and safety; and other donor issues. Conclusions It is intended that REDS-III serve as an impetus for more widespread recipient and linked donor-recipient research in the US as well as to help assure a safe and available blood supply in the US and in international locations. PMID:24188564

  1. Wave scheduling - Decentralized scheduling of task forces in multicomputers

    NASA Technical Reports Server (NTRS)

    Van Tilborg, A. M.; Wittie, L. D.

    1984-01-01

    Decentralized operating systems that control large multicomputers need techniques to schedule competing parallel programs called task forces. Wave scheduling is a probabilistic technique that uses a hierarchical distributed virtual machine to schedule task forces by recursively subdividing and issuing wavefront-like commands to processing elements capable of executing individual tasks. Wave scheduling is highly resistant to processing element failures because it uses many distributed schedulers that dynamically assign scheduling responsibilities among themselves. The scheduling technique is trivially extensible as more processing elements join the host multicomputer. A simple model of scheduling cost is used by every scheduler node to distribute scheduling activity and minimize wasted processing capacity by using perceived workload to vary decentralized scheduling rules. At low to moderate levels of network activity, wave scheduling is only slightly less efficient than a central scheduler in its ability to direct processing elements to accomplish useful work.

  2. Space shuttle system program definition. Volume 4: Cost and schedule report

    NASA Technical Reports Server (NTRS)

    1972-01-01

    The supporting cost and schedule data for the second half of the Space Shuttle System Phase B Extension Study is summarized. The major objective for this period was to address the cost/schedule differences affecting final selection of the HO orbiter space shuttle system. The contending options under study included the following booster launch configurations: (1) series burn ballistic recoverable booster (BRB), (2) parallel burn ballistic recoverable booster (BRB), (3) series burn solid rocket motors (SRM's), and (4) parallel burn solid rocket motors (SRM's). The implications of varying payload bay sizes for the orbiter, engine type for the ballistics recoverable booster, and SRM motors for the solid booster were examined.

  3. Content Analysis Schedule for Bilingual Education Programs: Adaptations of Bilingual Education.

    ERIC Educational Resources Information Center

    Hess, Richard T.

    This content analysis schedule for Adaptations of Bilingual Education of Orange, California, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the…

  4. Content Analysis Schedule for Bilingual Education Programs: BICEP Intercambio de la Cultura.

    ERIC Educational Resources Information Center

    Shore, Marietta Saravia; Nafus, Charles

    This content analysis schedule for BICEP Intercambio de la Cultura (San Bernardino, California), presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the…

  5. Long-Term Follow-Up of the E1199 Phase III Trial Evaluating the Role of Taxane and Schedule in Operable Breast Cancer

    PubMed Central

    Sparano, Joseph A.; Zhao, Fengmin; Martino, Silvana; Ligibel, Jennifer A.; Perez, Edith A.; Saphner, Tom; Wolff, Antonio C.; Sledge, George W.; Wood, William C.; Davidson, Nancy E.

    2015-01-01

    Purpose To determine long-term outcomes in a clinical trial evaluating the role of taxane type and schedule in operable breast cancer and evaluate the impact of obesity and black race on outcome. Patients and Methods A total of 4,954 eligible women with stage II to III breast cancer treated with four cycles of doxorubicin plus cyclophosphamide were randomly assigned to receive paclitaxel or docetaxel every 3 weeks for four doses or weekly for 12 doses using a 2 × 2 factorial design. The primary end point was disease-free survival (DFS). Results are expressed as hazard ratios (HRs) from Cox proportional hazards models. All P values are two sided. Results When compared with the standard every-3-week paclitaxel arm, after a median follow-up of 12.1 years, DFS significantly improved and overall survival (OS) marginally improved only for the weekly paclitaxel (HR, 0.84; P = .011 and HR, 0.87; P = .09, respectively) and every-3-week docetaxel arms (HR, 0.79; P = .001 and HR, 0.86; P = .054, respectively). Weekly paclitaxel improved DFS and OS (HR, 0.69; P = .010 and HR, 0.69; P = .019, respectively) in triple-negative breast cancer. For hormone receptor–positive, human epidermal growth factor receptor 2–nonoverexpressing disease, no experimental arm improved OS, and black race and obesity were associated with increased risk of breast cancer recurrence and death. Conclusion Improved outcomes initially observed for weekly paclitaxel were qualitatively similar but quantitatively less pronounced with longer follow-up, although exploratory analysis suggested substantial benefit in triple-negative disease. Further research is required to understand why obesity and race influence clinical outcome in hormone receptor–positive disease. PMID:26077235

  6. Phase III Program Study Report. Evaluation of the Child and Family Resource Program (CFRP).

    ERIC Educational Resources Information Center

    Johnson, Lynell; and Others

    Fourth in a series of Child and Family Resource Program (CFRP) evaluation reports, this document is devoted to the program study component, designed to illustrate CFRP operations across the country and to establish a descriptive context for statistical and analytic findings. Chapter 1 describes the process of building a network of linkages with…

  7. Phase III Technology for All Americans Project: Creating Assessment, Professional Development, and Program Standards for Technological Literacy.

    ERIC Educational Resources Information Center

    Dugger, William E., Jr.

    2001-01-01

    The goals of Phase III of the Technology for All Americans Project are to develop student assessment standards, professional development standards, program standards, and effective leaders. The project is based on the Standards for Technology Literacy, a NASA initiative. (JOW)

  8. 40 CFR 147.1751 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 23 2011-07-01 2011-07-01 false State-administered program-Class I, III, IV and V wells. 147.1751 Section 147.1751 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS North Dakota §...

  9. 40 CFR 147.1751 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false State-administered program-Class I, III, IV and V wells. 147.1751 Section 147.1751 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS North Dakota §...

  10. 40 CFR 147.1751 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 24 2013-07-01 2013-07-01 false State-administered program-Class I, III, IV and V wells. 147.1751 Section 147.1751 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS North Dakota §...

  11. 24 CFR 8.29 - Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... homebuyer, subject to maximum sales price limitations (see 24 CFR 235.320.) ... 235(i) and 235(j), Turnkey III and Indian housing mutual self-help programs). 8.29 Section 8.29... URBAN DEVELOPMENT Program Accessibility § 8.29 Homeownership programs (sections 235(i) and...

  12. 24 CFR 8.29 - Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... homebuyer, subject to maximum sales price limitations (see 24 CFR 235.320.) ... 235(i) and 235(j), Turnkey III and Indian housing mutual self-help programs). 8.29 Section 8.29... URBAN DEVELOPMENT Program Accessibility § 8.29 Homeownership programs (sections 235(i) and...

  13. 24 CFR 8.29 - Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... homebuyer, subject to maximum sales price limitations (see 24 CFR 235.320.) ... 235(i) and 235(j), Turnkey III and Indian housing mutual self-help programs). 8.29 Section 8.29... URBAN DEVELOPMENT Program Accessibility § 8.29 Homeownership programs (sections 235(i) and...

  14. 24 CFR 8.29 - Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... homebuyer, subject to maximum sales price limitations (see 24 CFR 235.320.) ... 235(i) and 235(j), Turnkey III and Indian housing mutual self-help programs). 8.29 Section 8.29... URBAN DEVELOPMENT Program Accessibility § 8.29 Homeownership programs (sections 235(i) and...

  15. 24 CFR 8.29 - Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... homebuyer, subject to maximum sales price limitations (see 24 CFR 235.320.) ... 235(i) and 235(j), Turnkey III and Indian housing mutual self-help programs). 8.29 Section 8.29... URBAN DEVELOPMENT Program Accessibility § 8.29 Homeownership programs (sections 235(i) and...

  16. 40 CFR 147.1751 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 24 2012-07-01 2012-07-01 false State-administered program-Class I, III, IV and V wells. 147.1751 Section 147.1751 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS North Dakota §...

  17. 40 CFR 147.1751 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 23 2014-07-01 2014-07-01 false State-administered program-Class I, III, IV and V wells. 147.1751 Section 147.1751 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS North Dakota §...

  18. Priorities and allocations support for energy: keeping energy programs on schedule

    SciTech Connect

    Not Available

    1985-08-01

    This publication has covered DOE and DOC procedures related to an application for rating authority for an energy program, the DPAS (Defense Priorities and Allocations System) and the Special Priorities Assistance Program's relation to priorities and allocations for energy programs. A person engaged in an eligible energy program or project must be familiar with DPAS rules, regulations and procedures. There are important benefits to be gained by the Government and the energy industry through the proper use of the priorities and allocations system.

  19. 40 CFR 147.1050 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... incorporation by reference was approved by the Director of the OFR in accordance with 5 U.S.C. 552(a) and 1 CFR... CONTROL PROGRAMS Maryland § 147.1050 State-administered program—Class I, II, III, IV, and V wells. The UIC program for Class I, II, III, IV, and V wells in the State of Maryland, except those wells on Indian...

  20. 40 CFR 147.1050 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... incorporation by reference was approved by the Director of the OFR in accordance with 5 U.S.C. 552(a) and 1 CFR... CONTROL PROGRAMS Maryland § 147.1050 State-administered program—Class I, II, III, IV, and V wells. The UIC program for Class I, II, III, IV, and V wells in the State of Maryland, except those wells on Indian...

  1. 40 CFR 147.1050 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... incorporation by reference was approved by the Director of the OFR in accordance with 5 U.S.C. 552(a) and 1 CFR... CONTROL PROGRAMS Maryland § 147.1050 State-administered program—Class I, II, III, IV, and V wells. The UIC program for Class I, II, III, IV, and V wells in the State of Maryland, except those wells on Indian...

  2. 40 CFR 147.1050 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... incorporation by reference was approved by the Director of the OFR in accordance with 5 U.S.C. 552(a) and 1 CFR... CONTROL PROGRAMS Maryland § 147.1050 State-administered program—Class I, II, III, IV, and V wells. The UIC program for Class I, II, III, IV, and V wells in the State of Maryland, except those wells on Indian...

  3. 40 CFR 147.1050 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... incorporation by reference was approved by the Director of the OFR in accordance with 5 U.S.C. 552(a) and 1 CFR... CONTROL PROGRAMS Maryland § 147.1050 State-administered program—Class I, II, III, IV, and V wells. The UIC program for Class I, II, III, IV, and V wells in the State of Maryland, except those wells on Indian...

  4. The scheduled squeeze on children's programs: tracking the implications of projected federal spending patterns.

    PubMed

    Steuerle, C Eugene; Isaacs, Julia B

    2014-12-01

    Federal programs for children are under increasing budgetary pressure. According to current federal law or any budget alternative being offered by the president or congressional leaders, spending on children would decline as a share of the budget and of the national economy. This article summarizes past, current, and projected budgets for children's programs. It traces significant historical expansions of means-tested programs, such as the Supplemental Nutrition Assistance Program; depicts fairly significant declines in more universal supports, such as the income tax exemption for dependents; and shows the future squeeze on children's programs brought about by automatic growth in health, retirement, and tax subsidy programs, along with the failure of revenues to keep pace with the overall growth in spending. Federal programs for health care have been a mixed blessing for children: Medicaid has grown to be the largest federal support for children, but overall federal health care costs eat away at the share of the budgetary pie left for anything else.

  5. Integrated Campaign Probabilistic Cost, Schedule, Performance, and Value for Program Office Support

    NASA Technical Reports Server (NTRS)

    Cornelius, David; Sasamoto, Washito; Daugherty, Kevin; Deacon, Shaun

    2012-01-01

    This paper describes an integrated assessment tool developed at NASA Langley Research Center that incorporates probabilistic analysis of life cycle cost, schedule, launch performance, on-orbit performance, and value across a series of planned space-based missions, or campaign. Originally designed as an aid in planning the execution of missions to accomplish the National Research Council 2007 Earth Science Decadal Survey, it utilizes Monte Carlo simulation of a series of space missions for assessment of resource requirements and expected return on investment. Interactions between simulated missions are incorporated, such as competition for launch site manifest, to capture unexpected and non-linear system behaviors. A novel value model is utilized to provide an assessment of the probabilistic return on investment. A demonstration case is discussed to illustrate the tool utility.

  6. Regional Office Procedures. Stage I Final Report for the Study of Program Management Procedures in the Campus-Based and Basic Grant Programs. (Volume III).

    ERIC Educational Resources Information Center

    Puma, Michael J.

    Volume III of a study of program management procedures in the campus-based and Basic Educational Opportunity Grant (BEOG) programs provides a description of procedures employed within the U.S. Office of Education regional offices to administer the Basic Grant and campus-based student financial assistance programs. The objective of the report is to…

  7. 76 FR 5830 - FBI Records Management Division; National Name Check Program Section; New User Fees Schedule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-02

    ... Final Rule establishing the process for setting fees (75 FR 24796 (May 6, 2010)). The ABC methodology is... effective March 4, 2011. FOR FURTHER INFORMATION CONTACT: FBI, RMD, National Name Check Program Section, 170... (CRS) through the National Name Check Program (NNCP) of the Records Management Division (RMD)....

  8. PROGRAM TO TRAIN TRADE UNIONISTS AND CAA STAFF WORKERS AS COMMUNITY ACTION TRAINERS, CURRICULUM AND SCHEDULE.

    ERIC Educational Resources Information Center

    EIGER, NORMAN

    OBJECTIVES OF THE TEN-DAY RESIDENTIAL TRAINING PROGRAM HELD IN JUNE 1967 WERE--TO UNDERSTAND THE ROLE OF THE TRAINER, TO DEVELOP SKILLS AND KNOWLEDGE IN WORKING WITH GROUPS AND IN IMPLEMENTING COMMUNITY ACTION TRAINING PROGRAMS, TO HEIGHTEN SELF-AWARENESS, TO LEARN TO APPLY FORCE FIELD ANALYSIS TO PROBLEM SOLVING, TO INTERPRET LABOR'S POSITION IN…

  9. DSN Scheduling Engine

    NASA Technical Reports Server (NTRS)

    Clement, Bradley; Johnston, Mark; Wax, Allan; Chouinard, Caroline

    2008-01-01

    The DSN (Deep Space Network) Scheduling Engine targets all space missions that use DSN services. It allows clients to issue scheduling, conflict identification, conflict resolution, and status requests in XML over a Java Message Service interface. The scheduling requests may include new requirements that represent a set of tracks to be scheduled under some constraints. This program uses a heuristic local search to schedule a variety of schedule requirements, and is being infused into the Service Scheduling Assembly, a mixed-initiative scheduling application. The engine resolves conflicting schedules of resource allocation according to a range of existing and possible requirement specifications, including optional antennas; start of track and track duration ranges; periodic tracks; locks on track start, duration, and allocated antenna; MSPA (multiple spacecraft per aperture); arraying/VLBI (very long baseline interferometry)/delta DOR (differential one-way ranging); continuous tracks; segmented tracks; gap-to-track ratio; and override or block-out of requirements. The scheduling models now include conflict identification for SOA(start of activity), BOT (beginning of track), RFI (radio frequency interference), and equipment constraints. This software will search through all possible allocations while providing a best-effort solution at any time. The engine reschedules to accommodate individual emergency tracks in 0.2 second, and emergency antenna downtime in 0.2 second. The software handles doubling of one mission's track requests over one week (to 42 total) in 2.7 seconds. Further tests will be performed in the context of actual schedules.

  10. Phase I/II Study Evaluating Early Tolerance in Breast Cancer Patients Undergoing Accelerated Partial Breast Irradiation Treated With the MammoSite Balloon Breast Brachytherapy Catheter Using a 2-Day Dose Schedule

    SciTech Connect

    Wallace, Michelle; Martinez, Alvaro; Mitchell, Christina; Chen, Peter Y.; Ghilezan, Mihai; Benitez, Pamela; Brown, Eric; Vicini, Frank

    2010-06-01

    Purpose: Initial Phase I/II results using balloon brachytherapy to deliver accelerated partial breast irradiation (APBI) in 2 days in patients with early-stage breast cancer are presented. Materials and Methods: Between March 2004 and August 2007, 45 patients received adjuvant radiation therapy after lumpectomy with balloon brachytherapy in a Phase I/II trial delivering 2800 cGy in four fractions of 700 cGy. Toxicities were evaluated using the National Cancer Institute Common Toxicity Criteria for Adverse Events v3.0 scale and cosmesis was documented at >=6 months. Results: The median age was 66 years (range, 48-83) and median skin spacing was 12 mm (range, 8-24). The median follow-up was 11.4 months (5.4-48 months) with 21 patients (47%) followed >=1 year, 11 (24%) >=2 years, and 7 (16%) >=3 years. At <6 months (n = 45), Grade II toxicity rates were 9% radiation dermatitis, 13% breast pain, 2% edema, and 2% hyperpigmentation. Grade III breast pain was reported in 13% (n = 6). At >=6 months (n = 43), Grade II toxicity rates were: 2% radiation dermatitis, 2% induration, and 2% hypopigmentation. Grade III breast pain was reported in 2%. Infection was 13% (n = 6) at <6 months and 5% (n = 2) at >=6 months. Persistent seroma >=6 months was 30% (n = 13). Fat necrosis developed in 4 cases (2 symptomatic). Rib fractures were seen in 4% (n = 2). Cosmesis was good/excellent in 96% of cases. Conclusions: Treatment with balloon brachytherapy using a 2-day dose schedule resulted acceptable rates of Grade II/III chronic toxicity rates and similar cosmetic results observed with a standard 5-day accelerated partial breast irradiation schedule.

  11. Design and Evaluation of the User-Adapted Program Scheduling system based on Bayesian Network and Constraint Satisfaction

    NASA Astrophysics Data System (ADS)

    Iwasaki, Hirotoshi; Sega, Shinichiro; Hiraishi, Hironori; Mizoguchi, Fumio

    In recent years, lots of music content can be stored in mobile computing devices, such as a portable digital music player and a car navigation system. Moreover, various information content like news or traffic information can be acquired always anywhere by a cellular communication and a wireless LAN. However, usability issues arise from the simple interfaces of mobile computing devices. Moreover, retrieving and selecting such content poses safety issues, especially while driving. Thus, it is important for the mobile system to recommend content automatically adapted to user's preference and situation. In this paper, we present the user-adapted program scheduling that generates sequences of content (Program) suiting user's preference and situation based on the Bayesian network and the Constraint Satisfaction Problem (CSP) technique. We also describe the design and evaluation of its realization system, the Personal Program Producer (P3). First, preference such as a genre ratio of content in a program is learned as a Bayesian network model using simple operations such as a skip behavior. A model including each content tends to become large-scale. In order to make it small, we present the model separation method that carries out losslessly compression of the model. Using the model, probabilistic distributions of preference to generate constraints are inferred. Finally satisfying the constraints, a program is produced. This kind of CSP has an issue of which the number of variables is not fixedness. In order to make it variable, we propose a method using metavariables. To evaluate the above methods, we applied them to P3 on a car navigation system. User evaluations helped us clarify that the P3 can produce the program that a user prefers and adapt it to the user.

  12. An Approximation Solution to Refinery Crude Oil Scheduling Problem with Demand Uncertainty Using Joint Constrained Programming

    PubMed Central

    Duan, Qianqian; Yang, Genke; Xu, Guanglin; Pan, Changchun

    2014-01-01

    This paper is devoted to develop an approximation method for scheduling refinery crude oil operations by taking into consideration the demand uncertainty. In the stochastic model the demand uncertainty is modeled as random variables which follow a joint multivariate distribution with a specific correlation structure. Compared to deterministic models in existing works, the stochastic model can be more practical for optimizing crude oil operations. Using joint chance constraints, the demand uncertainty is treated by specifying proximity level on the satisfaction of product demands. However, the joint chance constraints usually hold strong nonlinearity and consequently, it is still hard to handle it directly. In this paper, an approximation method combines a relax-and-tight technique to approximately transform the joint chance constraints to a serial of parameterized linear constraints so that the complicated problem can be attacked iteratively. The basic idea behind this approach is to approximate, as much as possible, nonlinear constraints by a lot of easily handled linear constraints which will lead to a well balance between the problem complexity and tractability. Case studies are conducted to demonstrate the proposed methods. Results show that the operation cost can be reduced effectively compared with the case without considering the demand correlation. PMID:24757433

  13. An approximation solution to refinery crude oil scheduling problem with demand uncertainty using joint constrained programming.

    PubMed

    Duan, Qianqian; Yang, Genke; Xu, Guanglin; Pan, Changchun

    2014-01-01

    This paper is devoted to develop an approximation method for scheduling refinery crude oil operations by taking into consideration the demand uncertainty. In the stochastic model the demand uncertainty is modeled as random variables which follow a joint multivariate distribution with a specific correlation structure. Compared to deterministic models in existing works, the stochastic model can be more practical for optimizing crude oil operations. Using joint chance constraints, the demand uncertainty is treated by specifying proximity level on the satisfaction of product demands. However, the joint chance constraints usually hold strong nonlinearity and consequently, it is still hard to handle it directly. In this paper, an approximation method combines a relax-and-tight technique to approximately transform the joint chance constraints to a serial of parameterized linear constraints so that the complicated problem can be attacked iteratively. The basic idea behind this approach is to approximate, as much as possible, nonlinear constraints by a lot of easily handled linear constraints which will lead to a well balance between the problem complexity and tractability. Case studies are conducted to demonstrate the proposed methods. Results show that the operation cost can be reduced effectively compared with the case without considering the demand correlation. PMID:24757433

  14. An approximation solution to refinery crude oil scheduling problem with demand uncertainty using joint constrained programming.

    PubMed

    Duan, Qianqian; Yang, Genke; Xu, Guanglin; Pan, Changchun

    2014-01-01

    This paper is devoted to develop an approximation method for scheduling refinery crude oil operations by taking into consideration the demand uncertainty. In the stochastic model the demand uncertainty is modeled as random variables which follow a joint multivariate distribution with a specific correlation structure. Compared to deterministic models in existing works, the stochastic model can be more practical for optimizing crude oil operations. Using joint chance constraints, the demand uncertainty is treated by specifying proximity level on the satisfaction of product demands. However, the joint chance constraints usually hold strong nonlinearity and consequently, it is still hard to handle it directly. In this paper, an approximation method combines a relax-and-tight technique to approximately transform the joint chance constraints to a serial of parameterized linear constraints so that the complicated problem can be attacked iteratively. The basic idea behind this approach is to approximate, as much as possible, nonlinear constraints by a lot of easily handled linear constraints which will lead to a well balance between the problem complexity and tractability. Case studies are conducted to demonstrate the proposed methods. Results show that the operation cost can be reduced effectively compared with the case without considering the demand correlation.

  15. 40 CFR 147.500 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Procedures Act); (3) Florida Administrative Code, Chapter 17-3 (1982) (Water Quality Standards); (4) Florida... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION... program for Class I, III, IV, and V wells in the State of Florida, except for those on Indian lands...

  16. 40 CFR 147.251 - EPA-administered program-Class I, III, IV and V wells and Indian lands.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Indian lands. (a) Contents. The UIC program in the State of California for Class I, III, IV and V wells... program requirements of 40 CFR parts 124, 144, 146, 148, and any additional requirements set forth in the..., IV and V wells and Indian lands. 147.251 Section 147.251 Protection of Environment...

  17. Comparison between different off-season resistance training programs in Division III American college football players.

    PubMed

    Hoffman, Jay R; Ratamess, Nicholas A; Klatt, Marc; Faigenbaum, Avery D; Ross, Ryan E; Tranchina, Nicholas M; McCurley, Robert C; Kang, Jie; Kraemer, William J

    2009-01-01

    The purpose of this study was to examine the efficacy of periodization and to compare different periodization models in resistance trained American football players. Fifty-one experienced resistance trained American football players of an NCAA Division III football team (after 10 weeks of active rest) were randomly assigned to 1 of 3 groups that differed only in the manipulation of the intensity and volume of training during a 15-week offseason resistance training program. Group 1 participated in a nonperiodized (NP) training program, group 2 participated in a traditional periodized linear (PL) training program, and group 3 participated in a planned nonlinear periodized (PNL) training program. Strength and power testing occurred before training (PRE), after 7 weeks of training (MID), and at the end of the training program (POST). Significant increases in maximal (1-repetition maximum [1RM]) squat, 1RM bench press, and vertical jump were observed from PRE to MID for all groups; these increases were still significantly greater at POST; however, no MID to POST changes were seen. Significant PRE to POST improvements in the medicine ball throw (MBT) were seen for PL group only. The results do not provide a clear indication as to the most effective training program for strength and power enhancements in already trained football players. Interestingly, recovery of training-related performances was achieved after only 7 weeks of training, yet further gains were not observed. These data indicate that longer periods of training may be needed after a long-term active recovery period and that active recovery may need to be dramatically shortened to better optimize strength and power in previously trained football players.

  18. Graduate Program Scheduling Gains Flexibility through Container Courses: A Case Study

    ERIC Educational Resources Information Center

    Rose, Richard

    2011-01-01

    Online course delivery makes possible one innovation which can provide each student with greater program flexibility as well as some personal ownership of the direction and pace of his degree progress. This concept can be called the "container course." A container course is the offering of more than one course simultaneously under a single course…

  19. 15 CFR Schedule I to Part 700 - Approved Programs and Delegate Agencies

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE NATIONAL SECURITY INDUSTRIAL... (Government owned) Do. C1 Food resources (combat rations) Do. C2 Department of Defense construction Do. C3... Designated Programs Do. K1 Federal supply items General Services Administration. Homeland security...

  20. Moral Education. Options in Education, Transcript for Program Scheduled for Broadcast the Week of September 13 [1976], Program No. 44.

    ERIC Educational Resources Information Center

    George Washington Univ., Washington, DC. Inst. for Educational Leadership.

    Teaching about moral issues is discussed in this transcript of "Options in Education," an electronic weekly magazine. Directed toward educators and students, the program covers news, features, policy, and people in the field of education and is available for broadcasting to member stations of National Public Radio. Seventeen montages deal with…

  1. Surprise Benefits of Arena Scheduling

    ERIC Educational Resources Information Center

    Surloff, Andrew

    2008-01-01

    One of the most challenging tasks a principal must accomplish every year is the construction of the master schedule. Free from the magnetic scheduling boards and wall charts of yesteryear, principals now have technological tools--such as programs that offer schools solutions for their scheduling needs--that can save time and enable them to work…

  2. Overview and update of the Demo III Experimental Unmanned Vehicle Program

    NASA Astrophysics Data System (ADS)

    Shoemaker, Chuck M.; Bornstein, Jonathan A.

    2000-07-01

    The Demo III Experimental Unmanned Ground Vehicle program is directed at developing autonomous mobility technology, integrating it onto a number of small, agile testbed vehicles and evaluating its maturity through a series of experiments conducted with the military user community. During FY99 the program focused upon development and integration of a baseline capability into two testbed vehicles that can maneuver cross country at speeds of up to 10 mph during daylight and 5 mph in darkness, over semi- arid terrain, i.e., terrain without significant vegetation. Efforts were centered on developing a multi-mode perception capability based upon both passive and active sensor systems that included stereo vision (using both normal CCD video and FLIR sensors), a multi-line laser scanner and imaging radar, implementation of the 4-D/RCS computer architecture, and a user-friendly operator interface incorporating advanced mission planning tools. The technology was evaluated in September '99 by the troops from the Armor Center during a Battle Lab Warfighting Experiment at Aberdeen Proving Ground, MD conducted by the Mounted Maneuver Battle Laboratory. During FY00, technical activities will focus on improving perception technology to permit higher speed day/night operation in obstacle-rich environments. A major technology thrust will be the introduction of object classification capabilities, e.g., the ability to differentiate between rocks and bushes or grass, into the autonomous mobility perception suite. This expanding capability is essential for future efforts directed at the development of tactical behaviors.

  3. 75 FR 26349 - Medicare Program; Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-11

    ... Physician Fee Schedule and Other Revisions to Part B for CY 2010; Final Rule'' (74 FR 61738), as well as... Physician Fee Schedule and Other Revisions to Part B for CY 2010; Corrections'' (74 FR 65449). DATES...: Rebecca Cole, (410) 786-4497. SUPPLEMENTARY INFORMATION: I. Background In FR Doc. E9-26502 of November...

  4. Medicare program; replacement of reasonable charge methodology by fee schedules for parenteral and enteral nutrients, equipment, and supplies. Final rule.

    PubMed

    2001-08-28

    This final rule implements fee schedules for payment of parenteral and enteral nutrition (PEN) items and services furnished under the prosthetic device benefit, defined in section 1861(s)(8) of the Social Security Act. The authority for establishing these fee schedules is provided by the Balanced Budget Act of 1997, which amended the Social Security Act at section 1842(s). Section 1842(s) of the Social Security Act specifies that statewide or other area wide fee schedules may be implemented for the following items and services still subject to the reasonable charge payment methodology: medical supplies; home dialysis supplies and equipment; therapeutic shoes; parenteral and enteral nutrients, equipment, and supplies; electromyogram devices; salivation devices; blood products; and transfusion medicine. This final rule describes changes made to the proposed fee schedule payment methodology for these items and services and provides that the fee schedules for PEN items and services are effective for all covered items and services furnished on or after January 1, 2002. Fee schedules will not be implemented for electromyogram devices and salivation devices at this time since these items are not covered by Medicare. In addition, fee schedules will not be implemented for medical supplies, home dialysis supplies and equipment, therapeutic shoes, blood products, and transfusion medicine at this time since the data required to establish these fee schedules are inadequate.

  5. NASA Schedule Management Handbook

    NASA Technical Reports Server (NTRS)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  6. Computerized Schedule Effectiveness Technique /SET/ determines present and future schedule position

    NASA Technical Reports Server (NTRS)

    Ballard, D.; Birdsong, J.; Calva, R.

    1967-01-01

    Computerized scheduling system calculates an index of overall schedule-effectiveness. The schedule-effectiveness index is a measurement of actual overall performance against the existing schedule, and a series of schedule-effectiveness values indicates the trend of actual performance. This computer program is written in Fortran 4.

  7. 40 CFR 147.51 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... of Agreement between EPA Region IV and the Alabama Department of Environment Management, signed by... 40 Protection of Environment 23 2014-07-01 2014-07-01 false State-administered program-Class I, III, IV, and V wells. 147.51 Section 147.51 Protection of Environment ENVIRONMENTAL PROTECTION...

  8. 40 CFR 147.51 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of Agreement between EPA Region IV and the Alabama Department of Environment Management, signed by... 40 Protection of Environment 23 2011-07-01 2011-07-01 false State-administered program-Class I, III, IV, and V wells. 147.51 Section 147.51 Protection of Environment ENVIRONMENTAL PROTECTION...

  9. 40 CFR 147.51 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of Agreement between EPA Region IV and the Alabama Department of Environment Management, signed by... 40 Protection of Environment 24 2013-07-01 2013-07-01 false State-administered program-Class I, III, IV, and V wells. 147.51 Section 147.51 Protection of Environment ENVIRONMENTAL PROTECTION...

  10. 40 CFR 147.51 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of Agreement between EPA Region IV and the Alabama Department of Environment Management, signed by... 40 Protection of Environment 24 2012-07-01 2012-07-01 false State-administered program-Class I, III, IV, and V wells. 147.51 Section 147.51 Protection of Environment ENVIRONMENTAL PROTECTION...

  11. 40 CFR 147.51 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... of Agreement between EPA Region IV and the Alabama Department of Environment Management, signed by... 40 Protection of Environment 22 2010-07-01 2010-07-01 false State-administered program-Class I, III, IV, and V wells. 147.51 Section 147.51 Protection of Environment ENVIRONMENTAL PROTECTION...

  12. 40 CFR 147.500 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Air and Water Pollution Control Act, Florida Statutes Annotated sections 403.011 through 403.90 (1973... Procedures Act); (3) Florida Administrative Code, Chapter 17-3 (1982) (Water Quality Standards); (4) Florida... CONTROL PROGRAMS Florida § 147.500 State-administered program—Class I, III, IV, and V wells. The...

  13. 40 CFR 147.500 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Air and Water Pollution Control Act, Florida Statutes Annotated sections 403.011 through 403.90 (1973... Procedures Act); (3) Florida Administrative Code, Chapter 17-3 (1982) (Water Quality Standards); (4) Florida... CONTROL PROGRAMS Florida § 147.500 State-administered program—Class I, III, IV, and V wells. The...

  14. 40 CFR 147.500 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Air and Water Pollution Control Act, Florida Statutes Annotated sections 403.011 through 403.90 (1973... Procedures Act); (3) Florida Administrative Code, Chapter 17-3 (1982) (Water Quality Standards); (4) Florida... CONTROL PROGRAMS Florida § 147.500 State-administered program—Class I, III, IV, and V wells. The...

  15. 40 CFR 147.500 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Air and Water Pollution Control Act, Florida Statutes Annotated sections 403.011 through 403.90 (1973... Procedures Act); (3) Florida Administrative Code, Chapter 17-3 (1982) (Water Quality Standards); (4) Florida... CONTROL PROGRAMS Florida § 147.500 State-administered program—Class I, III, IV, and V wells. The...

  16. A Sequenced Instructional Program in Physical Education for the Handicapped, Phase III. Producing and Disseminating Demonstration Packages. Final Report.

    ERIC Educational Resources Information Center

    Carr, Dorothy B.; Avance, Lyonel D.

    Presented is a sequenced instructional program in physical education which constitutes the third of a three-phase, 4-year project, funded by Title III, for handicapped children, preschool through high school levels, in the Los Angeles Unified School District. Described are the project setting and the following accomplishments: a curriculum guide…

  17. Role of class III phosphatidylinositol 3-kinase during programmed nuclear death of Tetrahymena thermophila.

    PubMed

    Akematsu, Takahiko; Fukuda, Yasuhiro; Attiq, Rizwan; Pearlman, Ronald E

    2014-02-01

    Programmed nuclear death (PND) in the ciliate protozoan Tetrahymena thermophila is a novel type of autophagy that occurs during conjugation, in which only the parental somatic macronucleus is destined to die and is then eliminated from the progeny cytoplasm. Other coexisting nuclei, however, such as new micro- and macronuclei are unaffected. PND starts with condensation in the nucleus followed by apoptotic DNA fragmentation, lysosomal acidification, and final resorption. Because of the peculiarity in the process and the absence of some ATG genes in this organism, the mechanism of PND has remained unclear. In this study, we focus on the role of class III phosphatidylinositol 3-kinase (PtdIns3K, corresponding to yeast Vps34) in order to identify central regulators of PND. We identified the sole Tetrahymena thermophila ortholog (TtVPS34) to yeast Vps34 and human PIK3C3 (the catalytic subunit of PtdIns3K), through phylogenetic analysis, and generated the gene knockdown mutant for functional analysis. Loss of TtVPS34 activity prevents autophagosome formation on the parental macronucleus, and this nucleus escapes from the lysosomal pathway. In turn, DNA fragmentation and final resorption of the nucleus are drastically impaired. These phenotypes are similar to the situation in the ATG8Δ mutants of Tetrahymena, implying an inextricable link between TtVPS34 and TtATG8s in controlling PND as well as general macroautophagy. On the other hand, TtVPS34 does not appear responsible for the nuclear condensation and does not affect the progeny nuclear development. These results demonstrate that TtVPS34 is critically involved in the nuclear degradation events of PND in autophagosome formation rather than with an involvement in commitment to the death program.

  18. Mapping of Primary Instructional Methods and Teaching Techniques for Regularly Scheduled, Formal Teaching Sessions in an Anesthesia Residency Program.

    PubMed

    Vested Madsen, Matias; Macario, Alex; Yamamoto, Satoshi; Tanaka, Pedro

    2016-06-01

    In this study, we examined the regularly scheduled, formal teaching sessions in a single anesthesiology residency program to (1) map the most common primary instructional methods, (2) map the use of 10 known teaching techniques, and (3) assess if residents scored sessions that incorporated active learning as higher quality than sessions with little or no verbal interaction between teacher and learner. A modified Delphi process was used to identify useful teaching techniques. A representative sample of each of the formal teaching session types was mapped, and residents anonymously completed a 5-question written survey rating the session. The most common primary instructional methods were computer slides-based classroom lectures (66%), workshops (15%), simulations (5%), and journal club (5%). The number of teaching techniques used per formal teaching session averaged 5.31 (SD, 1.92; median, 5; range, 0-9). Clinical applicability (85%) and attention grabbers (85%) were the 2 most common teaching techniques. Thirty-eight percent of the sessions defined learning objectives, and one-third of sessions engaged in active learning. The overall survey response rate equaled 42%, and passive sessions had a mean score of 8.44 (range, 5-10; median, 9; SD, 1.2) compared with a mean score of 8.63 (range, 5-10; median, 9; SD, 1.1) for active sessions (P = 0.63). Slides-based classroom lectures were the most common instructional method, and faculty used an average of 5 known teaching techniques per formal teaching session. The overall education scores of the sessions as rated by the residents were high.

  19. Scheduling game

    SciTech Connect

    Kleck, W

    1982-04-01

    Structuring a schedule - whether by Critical Path Method (CPM) or Precedence Charting System (PCS) - involves estimating the duration of one or more activities and arranging them in the most logical sequence. Given the start date, the completion date is relatively simple to determine. What is then so complicated about the process. It is complicated by the people involved - the people who make the schedules and the people who attempt to follow them. Schedules are an essential part of project management and construction contract administration. Much of the material available pertains to the mechanics of schedules, the types of logic networks, the ways that data can be generated and presented. This paper sheds light on other facets of the subject - the statistical and philosophical fundamentals involved in scheduling.

  20. Introduction of sequential inactivated polio vaccine-oral polio vaccine schedule for routine infant immunization in Brazil's National Immunization Program.

    PubMed

    Domingues, Carla Magda Allan S; de Fátima Pereira, Sirlene; Cunha Marreiros, Ana Carolina; Menezes, Nair; Flannery, Brendan

    2014-11-01

    In August 2012, the Brazilian Ministry of Health introduced inactivated polio vaccine (IPV) as part of sequential polio vaccination schedule for all infants beginning their primary vaccination series. The revised childhood immunization schedule included 2 doses of IPV at 2 and 4 months of age followed by 2 doses of oral polio vaccine (OPV) at 6 and 15 months of age. One annual national polio immunization day was maintained to provide OPV to all children aged 6 to 59 months. The decision to introduce IPV was based on preventing rare cases of vaccine-associated paralytic polio, financially sustaining IPV introduction, ensuring equitable access to IPV, and preparing for future OPV cessation following global eradication. Introducing IPV during a national multivaccination campaign led to rapid uptake, despite challenges with local vaccine supply due to high wastage rates. Continuous monitoring is required to achieve high coverage with the sequential polio vaccine schedule.

  1. 76 FR 57683 - Regulatory Review Schedule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... Regulation of Class II Gaming; (b) A Sole Proprietary Interest regulation; and (c) Class III MICS. The... regulations and Class III MICS after completion of the Tribal Advisory Committee process. This document... National Indian Gaming Commission 25 CFR Chapter III Regulatory Review Schedule AGENCY: National...

  2. Implementation of a scheduled toileting program in a long term care facility: evaluating the impact on injury risk to caregiving staff.

    PubMed

    Engst, Chris; Chhokar, Rahul; Robinson, Dan; Earthy, Ann; Tate, Robert B; Yassi, Annalee

    2004-10-01

    This study evaluated the impact of a scheduled toileting program on the risk of injury to caregivers and on resident agitation or aggressive behaviors. Injury data, ergonomic assessments, staff questionnaires, and resident agitation checklists were used to evaluate the program in a 75 bed unit, with a similar unit acting as a comparison. The program resulted in an increased percentage of residents toileted regularly in the intervention unit, while aggressive incidents declined in both groups. Staff in the intervention unit reported a significantly lower perceived risk of injury to the head and neck than the comparison group. Although the program resulted in increased workload to manage multitasking, monitor an additional aspect of scheduled care, and perform more toileting transfers, overall risk of physical injury was reduced. The toileting program, a shift toward resident focused care, and enhanced agitation awareness combined to reduce resident handling injuries and resident agitation expressed as verbal behaviors or emotional upset, but not as physical behaviors. Clear communication, mentoring, and monitoring were important for successfully changing care practices.

  3. Synchronization of estrus and ovulation in sows not conceiving in a scheduled fixed-time insemination program.

    PubMed

    Kauffold, Johannes; Beckjunker, Jochen; Kanora, Alain; Zaremba, Wolfgang

    2007-01-01

    A field study was conducted to investigate the effectiveness of a treatment with altrenogest, eCG and hCG or the GnRH-analogue D-Phe(6)-LHRH to synchronize estrus and ovulation of sows diagnosed as non-pregnant in order to reintegrate them back into a scheduled fixed-time insemination program. Sows (n=531) diagnosed as non-pregnant by ultrasonography on days 21-35 after insemination were subjected to one of three treatments: (1) 16 mg altrenogest/day/animal orally for 15 days to block follicular growth, followed by injection of 1000 IU eCG intramuscularly (i.m.) 24h after withdrawal of altrenogest to stimulate follicular growth and 500 IU hCG i.m. 78-80 h after eCG to induce ovulation; (2) similar to (1) except that 20mg altrenogest and 800 IU eCG were used and (3) similar to (2) except that 50 microg D-Phe(6)-LHRH was used to induce ovulation. Females were artificially inseminated (AI) twice at 24 and 40 h, respectively, after hCG/D-Phe(6)-LHRH. Success of treatments was checked by ultrasonography of the ovaries. Rates of conception and farrowing (CR, FR), and number of total and live born piglets (TB, LB) were recorded and compared to those of synchronized first served sows. Females had differing ovarian structures prior to treatment. Altrenogest effectively blocked follicular growth in >80% of the females irrespective of dosage, but 16 mg increased the development of polycystic ovarian degeneration. Four to 18% of the females still had corpora lutea after altrenogest. Most females ovulated either between both inseminations or thereafter (P<0.05). Females treated with D-Phe(6)-LHRH tended to ovulate earlier than those injected with hCG. The CR and FR were up to 25% lower for sows diagnosed as non-pregnant than for sows after first service (P<0.05). Among sows diagnosed as non-pregnant the CR was higher in females treated with D-Phe(6)-LHRH (P<0.05). No differences were found in regard to numbers of TB and LB. In conclusion, a treatment with 20mg altrenogest per

  4. 76 FR 1669 - Medicare Program; Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ... Policies Under the Physician Fee Schedule and Other Revisions to Part B for CY 2011; Final Rule'' (75 FR... CONTACT: Rebecca Cole or Erin Smith, (410) 786- 4497. SUPPLEMENTARY INFORMATION: I. Background In FR Doc. 2010-27969 of November 29, 2010 (75 FR 73170) (hereinafter referred to as the Calendar Year (CY)...

  5. Mission scheduling

    NASA Technical Reports Server (NTRS)

    Gaspin, Christine

    1989-01-01

    How a neural network can work, compared to a hybrid system based on an operations research and artificial intelligence approach, is investigated through a mission scheduling problem. The characteristic features of each system are discussed.

  6. Protein Export According to Schedule: Architecture, Assembly, and Regulation of Type III Secretion Systems from Plant- and Animal-Pathogenic Bacteria

    PubMed Central

    2012-01-01

    Summary: Flagellar and translocation-associated type III secretion (T3S) systems are present in most Gram-negative plant- and animal-pathogenic bacteria and are often essential for bacterial motility or pathogenicity. The architectures of the complex membrane-spanning secretion apparatuses of both systems are similar, but they are associated with different extracellular appendages, including the flagellar hook and filament or the needle/pilus structures of translocation-associated T3S systems. The needle/pilus is connected to a bacterial translocon that is inserted into the host plasma membrane and mediates the transkingdom transport of bacterial effector proteins into eukaryotic cells. During the last 3 to 5 years, significant progress has been made in the characterization of membrane-associated core components and extracellular structures of T3S systems. Furthermore, transcriptional and posttranscriptional regulators that control T3S gene expression and substrate specificity have been described. Given the architecture of the T3S system, it is assumed that extracellular components of the secretion apparatus are secreted prior to effector proteins, suggesting that there is a hierarchy in T3S. The aim of this review is to summarize our current knowledge of T3S system components and associated control proteins from both plant- and animal-pathogenic bacteria. PMID:22688814

  7. A DSN optimal spacecraft scheduling model

    NASA Technical Reports Server (NTRS)

    Webb, W. A.

    1982-01-01

    A computer model is described which uses mixed-integer linear programming to provide optimal DSN spacecraft schedules given a mission set and specified scheduling requirements. A solution technique is proposed which uses Bender's Method and a heuristic starting algorithm.

  8. NIF Title III engineering plan

    SciTech Connect

    Deis, G

    1998-06-01

    The purpose of this document is to define the work that must be accomplished by the NIF Project during Title III Engineering. This definition is intended to be sufficiently detailed to provide a framework for yearly planning, to clearly identify the specific deliverables so that the Project teams can focus on them, and to provide a common set of objectives and processes across the Project. This plan has been preceded by similar documents for Title I and Title II design and complements the Site Management Plan, the Project Control Manual, the Quality Assurance Program Plan, the RM Parsons NIF Title III Configuration Control Plan, the Integrated Project Schedule, the Preliminary Safety Analysis Report, the Configuration Management Plan, and the Transition Plan.

  9. Discovery: Guidelines for Establishing an Outdoor Education Program in Special Education, ESEA Title III Project.

    ERIC Educational Resources Information Center

    Bott, Kristine Ann; Bannasch, Donald Max

    Funded through the 1965 Elementary and Secondary Education Act (ESEA) Title III, the Project began serving youngsters handicapped either physically, mentally, or emotionally, who qualified for special education services in the fall of 1971. Among its objectives were to: (1) improve these youngsters' achievement in reqular school subjects, their…

  10. Program for Assisting the Replacement of Industrial Solvents PARIS III User’s Guide

    EPA Science Inventory

    PARIS III is a third generation Windows-based computer software to assist the design of less harmful solvent replacements by estimating values of the solvent properties that characterize the static, dynamic, performance, and environmental behavior of the original solvent mixture ...

  11. Migrant Grantees Directory: Title III-B Programs and Key Staff, Office of Economic Opportunity.

    ERIC Educational Resources Information Center

    National Migrant Information Clearinghouse, Austin, TX. Juarez-Lincoln Center.

    Eighty-eight Title III-B (Office of Economic Opportunity) grantees and contracting organizations are listed in this handbook for use by agencies working with migrant farm workers. The grantees and organizations are listed alphabetically by state. Mailing addresses and phone numbers, a listing of all key personnel as of August 1973, and the Board…

  12. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    SciTech Connect

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  13. The LSST OCS scheduler design

    NASA Astrophysics Data System (ADS)

    Delgado, Francisco; Schumacher, German

    2014-08-01

    The Large Synoptic Survey Telescope (LSST) is a complex system of systems with demanding performance and operational requirements. The nature of its scientific goals requires a special Observatory Control System (OCS) and particularly a very specialized automatic Scheduler. The OCS Scheduler is an autonomous software component that drives the survey, selecting the detailed sequence of visits in real time, taking into account multiple science programs, the current external and internal conditions, and the history of observations. We have developed a SysML model for the OCS Scheduler that fits coherently in the OCS and LSST integrated model. We have also developed a prototype of the Scheduler that implements the scheduling algorithms in the simulation environment provided by the Operations Simulator, where the environment and the observatory are modeled with real weather data and detailed kinematics parameters. This paper expands on the Scheduler architecture and the proposed algorithms to achieve the survey goals.

  14. Reaching Adults for Lifelong Learning. III. Directory of Reporting Programs and Statistical Tables.

    ERIC Educational Resources Information Center

    Paisley, Matilda B.; And Others

    Data from programs which participated in a study of lifelong learning programs in the United States are contained in this volume. A directory of 949 reporting adult education programs is followed by statistical tables with results from promotion questionnaires. Institutions are compared by size and type. (RS)

  15. Revenues and Expenses of Division III Intercollegiate Athletics Programs. Financial Trends and Relationships - 1997.

    ERIC Educational Resources Information Center

    Fulks, Daniel L.

    This report provides summary information concerning revenues and expenses of NCAA Division 3 intercollegiate athletics programs for the 1996-1997 fiscal year. The report compares revenue and expense trends of athletics programs within each of the NCAA divisions and revenues and expenses between men's and women's athletic programs. The…

  16. Student Development, Part III. How To Live: A Developmental Program for Student Volunteers.

    ERIC Educational Resources Information Center

    McCarty, Tim; And Others

    1989-01-01

    The evolution of the University of Minnesota's program of student volunteers in the college union is described. The program draws on developmental theories, and suggest ways of integrating union program production and specific educational goals for the volunteers engaged in that production: individual autonomy, commitment of values, integration of…

  17. Reaction to Reexamination: More on Type III Error in Program Evaluation.

    ERIC Educational Resources Information Center

    Cook, Thomas J.; Dobson, L. Douglas

    1982-01-01

    The authors respond to criticism and analyses by Eva Rezmovic (TM 507 851) of their experimental design, particularly the suggested use of information on the amount of program service received by the control group comparable to the treatment group in their study of the relationship between program implementation levels and program outcomes. (CM)

  18. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    PubMed

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable.

  19. Payload crew training scheduler (PACTS) user's manual

    NASA Technical Reports Server (NTRS)

    Shipman, D. L.

    1980-01-01

    The operation of the payload specialist training scheduler (PACTS) is discussed in this user's manual which is used to schedule payload specialists for mission training on the Spacelab experiments. The PACTS program is a fully automated interactive, computerized scheduling program equipped with tutorial displays. The tutorial displays are sufficiently detailed for use by a program analyst having no computer experience. The PACTS program is designed to operate on the UNIVAC 1108 computer system, and has the capability to load output into a PDP 11/45 Interactive Graphics Display System for printing schedules. The program has the capacity to handle up to three overlapping Spacelab missions.

  20. Pilot Educational Program for Mentally Disordered Minors 1972-1973: End of the Budget Period Report; E. S. E. A. Title III.

    ERIC Educational Resources Information Center

    Santa Cruz County Superintendent of Schools, CA.

    The report describes a 3-year, ongoing pilot project designed to devise a remedial educational program for 10 autistic elementary school children (5- to 12-years-old) that would prepare some students for subsequent entry into regular or special education public school classes. Described is a typical daily schedule emphasizing individual…

  1. Planning and scheduling for success

    NASA Technical Reports Server (NTRS)

    Manzanera, Ignacio

    1994-01-01

    Planning and scheduling programs are excellent management tools when properly introduced to the project management team and regularly maintained. Communications, creativity, flexibility and accuracy are substantially improved by following a simple set of rules. A planning and scheduling program will work for you if you believe in it, make others in your project team realize its benefits, and make it an extension of your project cost control philosophy.

  2. What Do Schools Want? Assessing Elementary School Administrator and Teacher Preferences Related to Nutrition Education Program Scheduling

    ERIC Educational Resources Information Center

    Hermann, Janice; Parker, Stephany; Phelps, Josh; Brown, Barbara

    2011-01-01

    Extension is positioned to provide school-based nutrition education programs as required by the 2004 Child Nutrition and WIC Reauthorization Act. To enhance program acceptance and sustainability, it is important to consider school administrators' and teachers' interests and preferences regarding nutrition education programming. The project…

  3. Gang scheduling a parallel machine

    SciTech Connect

    Gorda, B.C.; Brooks, E.D. III.

    1991-03-01

    Program development on parallel machines can be a nightmare of scheduling headaches. We have developed a portable time sharing mechanism to handle the problem of scheduling gangs of processors. User program and their gangs of processors are put to sleep and awakened by the gang scheduler to provide a time sharing environment. Time quantums are adjusted according to priority queues and a system of fair share accounting. The initial platform for this software is the 128 processor BBN TC2000 in use in the Massively Parallel Computing Initiative at the Lawrence Livermore National Laboratory. 2 refs., 1 fig.

  4. Technical assistance to support U. S. Department of Energy to review applications received under the NECPA Title III Grants Program

    SciTech Connect

    Jones, W.J.; Azad, B.

    1981-10-15

    This report gives a background on the Program, documents B and M's participation in the Program and makes recommendations for improving future review and evaluation processes. A background discussion is given on the purpose of NECPA Title III, followed by significance of energy conservation in the economy, its business potential, energy conservation in buildings, the buildings targeted by the NECPA Title III, i.e., schools, hospitals, local governments, and public care institutions, and a brief discussion of the grant awards process. A summary of the tasks that were performed, a classification in tabular form of the types of applications reviewed, and major problem areas encountered, and suggestions regarding possible improvements to the review process are given. Appendix A contains four lists of questions, two checklists, and a comment sheet used in the review process. Appendix B presents a list of working references which were consulted when needed during the review process. Appendix C lists the reviewed applications by number, type, number of buildings, state, and name of applicant institution. Appendix D provides examples of O and Ms and ECMs that were considered satisfactory by B and M.

  5. Systematic Instruction for Retarded Children: The Illinois Program. Part III: Self-Help Instruction.

    ERIC Educational Resources Information Center

    Linford, Maxine D.; And Others

    The manual for programed instruction of self care skills for trainable mentally handicapped children consists of dressing, dining, grooming, and toilet training. Teaching methods used include behavioral analysis and management, task analysis, and errorless learning. The lesson plans in each section are programed to maximize the child's success at…

  6. A Case Study of Technical Assistance to Demonstration Programs for Young Handicapped Children. Part III.

    ERIC Educational Resources Information Center

    Behr, Shirley K.; And Others

    The report describes the third and final year of a 3-year case study of the technical assistance process as implemented by the Technical Assistance Development System (TADS) for the staffs of two demonstration programs for preschool handicapped children and their families. Following a review of TADS and the two demonstration programs, the…

  7. Phase III Executive Summary. Evaluation of the Child and Family Resource Program (CFRP).

    ERIC Educational Resources Information Center

    Nauta, Marrit J.

    The Child and Family Resource Program (CFRP) is a family-oriented child development program initiated by the Administration for Children, Youth and Families to provide support services to low-income families and their children. This report summarizes preliminary findings based on the first year and a half of CFRP evalution. Following the brief…

  8. Phase III Research Report. Evaluation of the Child and Family Resource Program (CFRP).

    ERIC Educational Resources Information Center

    Nauta, Marrit J.; And Others

    This report, sixth in a series of Child and Family Resource Program (CFRP) evaluations, focuses on CFRP impact on families within outcome domains other than child development after a year and a half of program participation, additionally describing the nature and extent of that participation. Chapter 1 provides an overview of the CFRP evaluation…

  9. A Systematic Review of Health-Promotion Programs in NCAA Division III Institutions

    ERIC Educational Resources Information Center

    Hanson, Matthew

    2011-01-01

    Health-promotion in the workplace has existed for numerous years. However, the availability of health-promotion programs offered in institutions of higher education has seemed to lag behind other industries such as business. The purpose of this survey research project was to identify specific components of health-promotion programs within NCAA…

  10. The Biennial Report to Congress on the Implementation of the Title III State Formula Grant Program: School Years 2008-10

    ERIC Educational Resources Information Center

    Office of English Language Acquisition, US Department of Education, 2013

    2013-01-01

    This is the fourth biennial report to Congress on the implementation of the "Elementary and Secondary Education Act's" Title III State Formula Grant Program (also known as the English Language Acquisition State Grants Program). This report provides information reported by states to the U.S. Department of Education regarding services…

  11. The Biennial Report to Congress on the Implementation of the Title III State Formula Grant Program: School Years 2006-08

    ERIC Educational Resources Information Center

    Office of English Language Acquisition, US Department of Education, 2012

    2012-01-01

    This is the third biennial report to Congress on the implementation of the "Elementary and Secondary Education Act's" Title III State Formula Grant Program (also known as the English Language Acquisition State Grants Program). This report provides information regarding the U.S. Department of Education's efforts to hold states accountable…

  12. ORTEP-III: Oak Ridge Thermal Ellipsoid Plot Program for crystal structure illustrations

    SciTech Connect

    Burnett, M.N.; Johnson, C.K.

    1996-07-01

    This report describes a computer program for drawing crystal structure illustrations. Ball-and-stick type illustrations of a quality suitable for publication are produced with either spheres or thermal-motion probability ellipsoids on the atomic sites. The program can also produce stereoscopic pairs of illustrations which aid in the visualization of complex packing arrangements of atoms and thermal motion patterns. Interatomic distances, bond angles, and principal axes of thermal motion are also calculated to aid the structural study.

  13. 21 CFR 1308.13 - Schedule III.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... citations affecting § 1308.13, see the List of CFR Sections Affected, which appears in the Finding Aids... a stimulant effect on the central nervous system, including its salts, isomers (whether optical, positional, or geometric), and salts of such isomers whenever the existence of such salts, isomers, and...

  14. 21 CFR 1308.13 - Schedule III.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Federal Register citations affecting § 1308.13, see the List of CFR Sections Affected, which appears in... a stimulant effect on the central nervous system, including its salts, isomers (whether optical, positional, or geometric), and salts of such isomers whenever the existence of such salts, isomers, and...

  15. 21 CFR 1308.13 - Schedule III.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... a stimulant effect on the central nervous sxstem, including its salts, isomers (whether optical, position, or geometric), and salts of such isomers whenever the existence of such salts, isomers, and salts of isomers is possible within the specific chemical designation: (1) Those compounds, mixtures,...

  16. 21 CFR 1308.13 - Schedule III.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Federal Register citations affecting § 1308.13, see the List of CFR Sections Affected, which appears in... a stimulant effect on the central nervous system, including its salts, isomers (whether optical, positional, or geometric), and salts of such isomers whenever the existence of such salts, isomers, and...

  17. 21 CFR 1308.13 - Schedule III.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Federal Register citations affecting § 1308.13, see the List of CFR Sections Affected, which appears in... a stimulant effect on the central nervous sxstem, including its salts, isomers (whether optical, position, or geometric), and salts of such isomers whenever the existence of such salts, isomers, and...

  18. Evaluation of the Program: Randall Aerospace and Marine Science Program. A Title III Evaluation Project, Final Report.

    ERIC Educational Resources Information Center

    Goldberg, Isadore

    An interdisciplinary program related to aerospace and marine topics was created for students in the ninth and tenth grades in Washington, D.C. The curriculum and staff development focused upon the development of experiences incorporated within science, mathematics, communication skills, career education, and physical education. Objectives of the…

  19. Project SOUL: Computer Training Program for High School Students from Disadvantaged Areas. Part III, The Scientific Programming Course. Technical Report.

    ERIC Educational Resources Information Center

    Lew, Art

    This report details the Scientific Programming Course that is a part of "Project SOUL." The course is intended for underprivileged high school juniors and seniors having an interest in mathematics or science and aspirations to attend college. The report is divided into three sections. In section I, the administration and operation of the course as…

  20. 78 FR 17895 - Schedules of Controlled Substances: Placement of Alfaxalone into Schedule IV

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-25

    ... dependence or psychological dependence relative to the drugs or other substances in Schedule III. 21 U.S.C... models of anxiety, such as the elevated plus maze, the conflict test and restraint stress. In a...

  1. Astronaut Office Scheduling System Software

    NASA Technical Reports Server (NTRS)

    Brown, Estevancio

    2010-01-01

    AOSS is a highly efficient scheduling application that uses various tools to schedule astronauts weekly appointment information. This program represents an integration of many technologies into a single application to facilitate schedule sharing and management. It is a Windows-based application developed in Visual Basic. Because the NASA standard office automation load environment is Microsoft-based, Visual Basic provides AO SS developers with the ability to interact with Windows collaboration components by accessing objects models from applications like Outlook and Excel. This also gives developers the ability to create newly customizable components that perform specialized tasks pertaining to scheduling reporting inside the application. With this capability, AOSS can perform various asynchronous tasks, such as gathering/ sending/ managing astronauts schedule information directly to their Outlook calendars at any time.

  2. A Guide for Planning Drafting and Design Technology Programs. Section III, Data Collection and Analysis.

    ERIC Educational Resources Information Center

    1971

    This document, the second of three related reports, constitutes the data collection and analysis section of the study designed to provide information for preparing a planning guide for drafting and design technology programs. The curriculum survey instrument mailed to 26 schools, contained questions regarding: (1) length of semesters, (2)…

  3. A Two-Year Report on the Experimental Freshman Year Program. Chapter III, Procedures.

    ERIC Educational Resources Information Center

    Kibler, Robert J., Ed.

    This chapter outlines the procedures followed in an experimental program for low-achievers during their freshman year at Southern Illinois University. Specifically described are the experimental design, selection of subjects, and the treatment according to the experimental, control, and norm groups. In addition, the sample group is described in…

  4. Core III Materials for Rural Agriculture Programs. Units A-G.

    ERIC Educational Resources Information Center

    Courson, Roger L.; And Others

    This curriculum guide includes teaching packets for 12 areas of study to be included in a core curriculum for 11th-grade or third-year students enrolled in rural agricultural programs in Illinois. Each problem area includes some or all of the following components: suggestions to the teacher, teacher guide, competency inventory, information sheet,…

  5. Core III Materials for Metropolitan Agriculture/Horticulture Programs. Units A-I.

    ERIC Educational Resources Information Center

    Biondo, Ron; And Others

    This first volume of a two-volume curriculum guide contains 11 problem areas selected for study to be included in a core curriculum for 11th-grade or third-year students enrolled in a metropolitan agricultural program. The 11 problem areas are divided into eight units: Orientation to Agricultural Occupations (Gaining Employment), Supervised…

  6. The Survey of College Marketing Programs. Volume III: Electronic Advertising and Marketing.

    ERIC Educational Resources Information Center

    Primary Research Group, Inc., New York, NY.

    This report presents 203 tables detailing findings concerning the use of electronic advertising within marketing programs at 68 colleges and universities. Highlights of this report include: colleges in the sample enroll a mean of 5,450 students; 5.6 percent of the colleges produce a CD-ROM version of the viewbook; 39.7 percent enable applicants to…

  7. Habilitation of the Severely and Profoundly Retarded: Volume III. Reports from the Specialized Training Program.

    ERIC Educational Resources Information Center

    Horner, Robert H., Ed.; Bellamy, G. Thomas, Ed.

    Sixteen papers concerned with vocational habilitation of the severely and profoundly retarded are organized into three parts: issues in habilitation, stimulus control of vocational behavior, and instrumentation for program evaluation. Papers have the following titles and authors: "Structured Employment: Productivity and Productive Capacity" (R.…

  8. Highway Surveying. Instructor's Guide for an Adult Course. Highway Technicians Program Unit III.

    ERIC Educational Resources Information Center

    Fimmano, Ralph; Kacharian, John C.

    The revised instructor's guide, which is part of the New York State Highway Technician's Program to provide needed technicians and engineers by upgrading people in the lower-level technician jobs, is geared toward the improvement of technical skills and knowledge in highway surveying. In view of the shortage of qualified technicians and engineers…

  9. Core III Materials for Metropolitan Agriculture/Horticulture Programs. Units J-M.

    ERIC Educational Resources Information Center

    Biondo, Ron; And Others

    This second volume of a two-volume curriculum guide contains 11 problem areas selected for study to be included in a core curriculum for 11th grade or third-year students enrolled in a metropolitan agricultural program. The 11 problem areas are divided into four units: Soil Science and Conservation of Natural Resources (Understanding Soils,…

  10. Energy Economic Data Base (EEDB) Program. Phase III. Final report and third update

    SciTech Connect

    Crowley, J. H.; Allen, R. E.; Aklu, G. L.; Benedict, R. G.; Brown, P. E.; Hodson, J. S.; Kaminski, R. S.; Lee, N. H.; Marda, R. S.; Martin, R. J.; Molin, A. T.; Smith, M. H.; Sosnowicz, E. J.; Valorie, C. M.; Woodhull, A. S.; Ziegler, E. J.

    1981-07-01

    The objective of the USDOE EEDB Program is to provide periodic updates of technical and cost (capital, fuel and operating and maintenance) information of significance to the US Department of Energy. This information is intended to be used by USDOE in evauating and monitoring US civilian nuclear power programs, and to provide them with a consistent means of evaluating the nuclear option and proposed alternatives. The data tables, which make up the bulk of the report, are updated to January 1, 1980. The data in these tables and in the backup data file supercede the information presented in the Second Update (1979). Where required, new descriptive information is added in the text to supplement the data tables.

  11. A System for Automatically Generating Scheduling Heuristics

    NASA Technical Reports Server (NTRS)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  12. The Oral History Program: III. Personal views of health sciences librarianship and the Medical Library Association.

    PubMed Central

    McKenzie, D; Pifalo, V

    1998-01-01

    The Medical Library Association Oral History Program uses accepted oral history techniques to collect and preserve interviews with members. The original taped interviews and transcripts are kept in the Medical Library Association archives and made available for research purposes; edited copies of the interviews are distributed through the National Network of Libraries of Medicine, and members are encouraged to borrow and read the histories. Summaries of forty-three interviews provide personal views on health sciences librarianship and the Medical Library Association. PMID:9803287

  13. 77 FR 227 - Medicare Program; Payment Policies Under the Physician Fee Schedule, Five-Year Review of Work...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-04

    ... physician payment not previously identified. SUPPLEMENTARY INFORMATION: I. Background In FR Doc. 2011-28597 of November 28, 2011 (76 FR 73026), the final rule with comment period entitled ``Medicare Program.... Correction of Errors 0 In FR Doc. 2011-28597 of November 28, 2011 (76 FR 73026), the final rule with...

  14. 76 FR 32409 - Medicare Program; Five-Year Review of Work Relative Value Units Under the Physician Fee Schedule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-06

    ... final rule with comment period (75 FR 73328 through 73329). During our clinical review to assess the... comment period (75 FR 73226 through 73227), as described above, in the AMA RUC's review of Site-of-Service... 42 CFR Part 414 Medicare Program; Five-Year Review of Work Relative Value Units Under the...

  15. A Study of Career Development, Learning Motivation, and Learning Satisfaction of Adult Learners in Unconventional Scheduling Graduate Programs

    ERIC Educational Resources Information Center

    Chu, Hui-Chin; Hsieh, Mei-Chi; Chang, Shan-Chih

    2007-01-01

    The study aimed at investigating the relationships among career development, learning motivation, and learning satisfaction of adult learners in master's programs at S University. Questionnaires were distributed with 211 valid returns (71%). The results indicated that some of the demographics are factors affecting both of the learners' learning…

  16. Safety with Ocrelizumab in Rheumatoid Arthritis: Results from the Ocrelizumab Phase III Program

    PubMed Central

    Emery, Paul; Rigby, William; Tak, Paul P.; Dörner, Thomas; Olech, Ewa; Martin, Carmen; Millar, Laurie; Travers, Helen; Fisheleva, Elena

    2014-01-01

    Objective The objective was to determine the safety of ocrelizumab (OCR) in patients with rheumatoid arthritis (RA). Methods This was an analysis of the double-blind, placebo-controlled periods and long-term follow-up of 4 OCR phase III trials in RA (SCRIPT, STAGE, FILM and FEATURE). Safety data per study and the results of a meta-analysis of serious infectious events (SIEs) are presented. Results Overall, 868 patients received placebo, 1064 patients OCR 200 mg×2 (or 400 mg×1) (OCR200), and 827 patients OCR 500 mg×2 (OCR500) plus background methotrexate (MTX) at baseline and 24 weeks. During the double-blind, placebo-controlled periods, the incidence of adverse events and serious adverse events was comparable between the OCR+MTX and placebo +MTX groups. Infusion-related reactions were more common with OCR+MTX and decreased in frequency with subsequent infusions. Serious infusion-related reactions were rare (0.1%). Serious infections occurred more frequently with OCR500+MTX. In the meta-analysis, a statistically significant difference from placebo +MTX in incidence of SIEs per 100 patient-years of 2.4 (95% CI, 0.3–4.5) was observed with OCR500+MTX, but not with OCR200+MTX (0.6; 95% CI, −1.3 to 2.4). Patients recruited in Asia exhibited a higher risk of serious infections (hazard ratio, 1.78; 95% CI, 1.03–3.06). The incidence of human anti-human antibodies was <5%. Long-term follow-up indicated no differences in malignancy rates between the treatment groups. There was no apparent difference in time to B-cell repletion between the OCR dose groups. Conclusions In placebo-controlled clinical trials of RA, OCR500+MTX was associated with a higher risk of serious infections compared with placebo +MTX. The safety profile of OCR 200+MTX was comparable with placebo+MTX. Trial Registration STAGE Clinical Trials.gov NCT00406419 SCRIPT Clinical Trials.gov NCT00476996 FILM Clinical Trials.gov NCT00485589 FEATURE Clinical Trials.gov NCT00673920 PMID:24498318

  17. Users Speak Out: A Look at Six Administrative Software Programs.

    ERIC Educational Resources Information Center

    Bruder, Isabelle

    1988-01-01

    Reviews six microcomputer-based administrative software programs that handle scheduling, grade reporting, and attendance tasks: (1) Alpha II, (2) Harts III, (3) Mount Castor, (4) The Osiris System, (5) The School System, and (6) STARS (Student Academic Records System). Companies producing the programs, systems they run on, and price information…

  18. Medicare program; revisions to payment policies under the physician fee schedule for calendar year 2005. Final rule with comment period.

    PubMed

    2004-11-15

    care institution items and services to the beneficiary's home. In addition, this rule updates the codes subject to the physician self-referral prohibition, discusses payment for set-up of portable x-ray equipment, discusses the third five-year refinement of work RVUs, and solicits comments on potentially misvalued work RVUs. We are also finalizing the calendar year (CY) 2004 interim RVUs and are issuing interim RVUs for new and revised procedure codes for CY 2005. As required by the statute, we are announcing that the physician fee schedule update for CY 2005 is 1.5 percent, the initial estimate for the sustainable growth rate for CY 2005 is 4.3, and the conversion factor for CY 2005 is $37.8975.

  19. Evolutionary Scheduler for the Deep Space Network

    NASA Technical Reports Server (NTRS)

    Guillaume, Alexandre; Lee, Seungwon; Wang, Yeou-Fang; Zheng, Hua; Chau, Savio; Tung, Yu-Wen; Terrile, Richard J.; Hovden, Robert

    2010-01-01

    A computer program assists human schedulers in satisfying, to the maximum extent possible, competing demands from multiple spacecraft missions for utilization of the transmitting/receiving Earth stations of NASA s Deep Space Network. The program embodies a concept of optimal scheduling to attain multiple objectives in the presence of multiple constraints.

  20. The Research Program at RIBRAS (Radioactive Ion Beams in Brasil)-III

    SciTech Connect

    Lichtenthaeler, R.; Lepine-Szily, A.; Guimaraes, V.; Faria, P. N. de; Mendes, D. R. Jr; Pires, K. C. C.; Morcelle, V.; Barioni, A.; Morais, M. C.; Pampa Condori, R.; Assuncao, M.; Moro, A. M.; Rodriguez-Gallardo, M.; Arazi, A.

    2010-04-30

    A part of the research program developed in the RIBRAS facility over the last four years is presented. Experiments using radioactive secondary beams of light exotic nuclei such as {sup 6}He, {sup 7}Be, {sup 8}Li on several targets have been performed. Elastic angular distributions have been analysed by the Optical Model and four body Continuous Discretized Coupled Channels Calculations (4b-CDCC) and the total reaction cross sections have been obtained. A comparison between the reaction cross sections of {sup 6}He and other stable projectiles with medium-heavy targets was performed. Measurements of the proton transfer reaction {sup 12}C({sup 8}Li,{sup 9}Be){sup 11}B are also presented.

  1. Scheduling the Secondary School.

    ERIC Educational Resources Information Center

    Dempsey, Richard A.; Traverso, Henry P.

    This "how-to-do-it" manual on the intricacies of school scheduling offers both technical information and common sense advice about the process of secondary school scheduling. The first of six chapters provides an overview of scheduling; chapter 2 examines specific considerations for scheduling; chapter 3 surveys the scheduling models and their…

  2. Helping General Physical Educators and Adapted Physical Educators Address the Office of Civil Rights Dear Colleague Guidance Letter: Part III--Practitioners and Programs

    ERIC Educational Resources Information Center

    Poulin, David; Martinez, David; Aenchbacher, Amy; Aiello, Rocco; Doyle, Mike; Hilgenbrinck, Linda; Busse, Sean; Cappuccio, Jim

    2013-01-01

    In Part III of the feature, physical educators and adapted physical educators offer current best practices as models of implementation for readers. Contributions included are: (1) Answer to the Dear Colleague Letter from the Anchorage School District's Adapted Sport Program (David Poulin); (2) Georgia's Adapted Physical Educators…

  3. SUPERSTARS III: K-2.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Education, Raleigh.

    SUPERSTARS III is a K-8 program designed as an enrichment opportunity for self-directed learners in mathematics. The basic purpose of SUPERSTARS III is to provide the extra challenge that self-motivated students need in mathematics and to do so in a structured, long-term program that does not impinge on the normal classroom routine or the…

  4. Scheduling Reconsidered (Again!)

    ERIC Educational Resources Information Center

    Hentschke, Guilbert C.; Fowler, William J.

    1974-01-01

    Computer technicians bring to school scheduling a certain naivete regarding the operation of schools. School administrators play a fundamental role of informing technicians about education scheduling needs. (Author)

  5. Iterative refinement scheduling

    NASA Technical Reports Server (NTRS)

    Biefeld, Eric

    1992-01-01

    We present a heuristics-based approach to deep space mission scheduling which is modeled on the approach used by expert human schedulers in producing schedules for planetary encounters. New chronological evaluation techniques are used to focus the search by using information gained during the scheduling process to locate, classify, and resolve regions of conflict. Our approach is based on the assumption that during the construction of a schedule there exist several disjunct temporal regions where the demand for one resource type or a single temporal constraint dominates (bottleneck regions). If the scheduler can identify these regions and classify them based on their dominant constraint, then the scheduler can select the scheduling heuristic.

  6. Robust telescope scheduling

    NASA Technical Reports Server (NTRS)

    Swanson, Keith; Bresina, John; Drummond, Mark

    1994-01-01

    This paper presents a technique for building robust telescope schedules that tend not to break. The technique is called Just-In-Case (JIC) scheduling and it implements the common sense idea of being prepared for likely errors, just in case they should occur. The JIC algorithm analyzes a given schedule, determines where it is likely to break, reinvokes a scheduler to generate a contingent schedule for each highly probable break case, and produces a 'multiply contingent' schedule. The technique was developed for an automatic telescope scheduling problem, and the paper presents empirical results showing that Just-In-Case scheduling performs extremely well for this problem.

  7. Future aircraft networks and schedules

    NASA Astrophysics Data System (ADS)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  8. Innovative Integration of Decommissioning and Deactivation Program with Soil-Groundwater Clean Up Program Has Positive Results on Budget and Schedule: A Case Study

    SciTech Connect

    Schappell, B; Rucker, G

    2007-07-25

    An innovative approach to integrate the activities of a decommissioning and deactivation program (D&D) with a soil-groundwater clean up program has had significant positive results saving both money and time at the Department of Energy's Savannah River Site. The accomplishments that have been achieved by the combining the two programs have been remarkable including significant cost savings, economies of scale for sampling and document generation, and alignment of common objectives. Because of the coordination of both activities area-wide ''end states'' can be formulated and be consistent with the customers' cleanup goals and federal regulations. This coordinates and aligns both the environmental clean up and D&D objectives because each must be addressed simultaneously and comprehensively. In this respect, resources from both organizations can be pooled to take advantage of the strengths of each. The new approach allows more efficient use of lean financial resources and optimizes workforce activities to attain the common objectives while being more cost effective, more protective of the environment, and optimizing the use existing resources.

  9. Adoption of community-based cardiac rehabilitation programs and physical activity following phase III cardiac rehabilitation in Scotland: a prospective and predictive study.

    PubMed

    Sniehotta, Falko F; Gorski, Charlotta; Araujo-Soares, Vera

    2010-09-01

    Little is known about levels of physical activity and attendance at phase IV community-based Cardiac Rehabilitation (CR) programs following completion of exercise-focussed, hospital-based phase III CR. This study aims to test, compare and combine the predictive utility of the Common-Sense Self-Regulation Model (CS-SRM) and the extended Theory of Planned Behaviour (TPB) with action planning for two rehabilitation behaviours: physical activity and phase IV CR attendance. Individuals diagnosed with coronary heart disease (n = 103) completed baseline measures of illness perceptions, intentions, perceived behavioural control (PBC), action planning and past physical activity in the last week of a phase III CR program, and 95 participants completed follow-up measures of physical activity and attended phase IV CR (objectively confirmed) 2 months later. Only one predictor (PBC/cyclical timeline) significantly predicted levels and change of physical activity. While illness perceptions were not predictive of phase IV CR attendance, the extended TPB model showed good predictive power with action planning and intention as the most powerful predictors. Amongst participants who planned when and where to attend phase IV CR at the end of phase III rehabilitation, 65.9% subsequently attended a phase IV CR program compared to only 18.5% of those who had not made a plan. This study adds to our understanding of cardiac rehabilitation behaviour after completion of health service delivered programs. Comparing theoretical models and rehabilitation behaviours contributes to the development of behaviour theory.

  10. Integrated online job-shop scheduling system

    NASA Astrophysics Data System (ADS)

    Zhao, Xing; Chen, Kuan H.; Luh, Peter B.; Chiueh, T. D.; Chang, ShihChang; Thakur, Lakshman S.

    1999-11-01

    The rapid development of information technology and e- commerce requires fast response form scheduling systems. Based on the Lagrangian relaxation approach for job shop scheduling, this paper present an integrated system that will generate schedules quickly. The Lagrangian relaxation approach is an iterative optimization process, where dynamic programming is solved in each iteration. Since dynamic programming is computational expensive especially for large problems, this paper develops the simplified dynamic programming, which will cut the computation time of each iteration by one order. Furthermore, a digital circuit to be embedded in PC is designed to implement the iterative optimization algorithm, leading to another order of speed improvement. The resulting integrated scheduling system consists of the hardware for optimization and the related software. It is estimated that two orders of magnitude gain in speed can be obtained, which will make on-line scheduling for practical job shops possible.

  11. Prevalence of Metabolic Syndrome among Korean Adolescents According to the National Cholesterol Education Program, Adult Treatment Panel III and International Diabetes Federation

    PubMed Central

    Kim, Seonho; So, Wi-Young

    2016-01-01

    In both adults and children, metabolic syndrome (MetS) has been attributed to risk factors for type 2 diabetes and cardiovascular disease such as insulin resistance, abdominal obesity, hypertension, and dyslipidemia. This descriptive study aimed to compare the prevalence of MetS and diagnostic components according to the National Cholesterol Education Program, Adult Treatment Panel III (NCEP-ATP III) and International Diabetes Federation (IDF) in 2330 Korean adolescents (10–18 years), using data from the 2010–2012 Korea National Health and Nutrition Examination Survey-V. The NCEP-ATP III and IDF were used to diagnose MetS and yielded prevalence rates of 5.7% and 2.1%, respectively, with no sex-related differences. The most frequent MetS diagnostic components according to the NCEP-ATP III and IDF criteria were high triglyceride levels (21.2%) and low high-density lipoprotein cholesterol levels (13.6%), respectively; approximately 50.1% and 33.1% of adolescents had at least one MetS diagnostic component according to the respective criteria. Both overweight/obese male and female adolescents exhibited significantly increased prevalence rates of MetS and related diagnostic components, compared to normal-weight adolescents. In conclusion, the prevalence rates of MetS and diagnostic components differ according to the NCEP-ATP III and IDF criteria. Henceforth, efforts are needed to establish diagnostic criteria for Korean adolescents. PMID:27706073

  12. The Basic Program of Vocational Agriculture in Louisiana. Ag I and Ag II (9th and 10th Grades). Volume III. Bulletin 1690-III.

    ERIC Educational Resources Information Center

    Louisiana State Dept. of Education, Baton Rouge. Div. of Vocational Education.

    This curriculum guide, the third volume of the series, outlines the basic program of vocational agriculture for Louisiana students in the ninth and tenth grades. Covered in the five units on plant science are growth processes of plants, cultural practices for plants, insects affecting plants, seed and plant selection, and diseases that affect…

  13. Protocols for distributive scheduling

    NASA Technical Reports Server (NTRS)

    Richards, Stephen F.; Fox, Barry

    1993-01-01

    The increasing complexity of space operations and the inclusion of interorganizational and international groups in the planning and control of space missions lead to requirements for greater communication, coordination, and cooperation among mission schedulers. These schedulers must jointly allocate scarce shared resources among the various operational and mission oriented activities while adhering to all constraints. This scheduling environment is complicated by such factors as the presence of varying perspectives and conflicting objectives among the schedulers, the need for different schedulers to work in parallel, and limited communication among schedulers. Smooth interaction among schedulers requires the use of protocols that govern such issues as resource sharing, authority to update the schedule, and communication of updates. This paper addresses the development and characteristics of such protocols and their use in a distributed scheduling environment that incorporates computer-aided scheduling tools. An example problem is drawn from the domain of space shuttle mission planning.

  14. Clean Air Act Title III accidental emission release risk management program, and how it applies to landfills

    SciTech Connect

    Hibbard, C.S.

    1999-07-01

    On June 20, 1996, EPA promulgated regulations pursuant to Title III of the Clean Air Act (CAA) Amendments of 1990 (Section 112(r)(7) of the CAA). The rule, contained in 40 CFR Part 68, is called Accidental Release Prevention Requirements: Risk Management Programs, and is intended to improve accident prevention and emergency response practices at facilities that store and/or use hazardous substances. Methane is a designated highly hazardous chemical (HHC) under the rule. The rule applies to facilities that have 10,000 pounds of methane or more in any process, roughly equivalent to about 244,000 cubic feet of methane. The US EPA has interpreted this threshold quantity as applying to landfill gas within landfills. This paper presents an overview of the Accidental Release Prevention regulations, and how landfills are affected by the requirements. This paper describes methodologies for calculating the threshold quantity of landfill gas in a landfill. Methane is in landfill gas as a mixture. Because landfill gas can burn readily, down to concentrations of about five percent methane, the entire landfill gas mixture must be treated as the regulated substance, and counts toward the 10,000-pound threshold. It is reasonable to assume that the entire landfill gas collection system, active or passive, is filled with landfill gas, and that a calculation of the volume of the system would be a calculation of the landfill gas present in the process on the site. However, the US EPA has indicated that there are some instances in which pore space gas should be included in this calculation. This paper presents methods available to calculate the amount of pore space gas in a landfill, and how to determine how much of that gas might be available for an explosion. The paper goes through how to conduct the release assessment to determine the worst-case hazard zone around the landfill.

  15. A Heuristic Approach to Scheduling University Timetables.

    ERIC Educational Resources Information Center

    Loo, E. H.; And Others

    1986-01-01

    Categories of facilities utilization and scheduling requirements to be considered when using a heuristic approach to timetabling are described together with a nine-step algorithm and the computerized timetabling system, Timetable Schedules System (TTS); TTS utilizes heuristic approach. An example demonstrating use of TTS and a program flowchart…

  16. 40 CFR 52.134 - Compliance schedules.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Compliance schedules. 52.134 Section 52.134 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Arizona § 52.134 Compliance schedules. (a)...

  17. 40 CFR 52.134 - Compliance schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Compliance schedules. 52.134 Section 52.134 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Arizona § 52.134 Compliance schedules. (a)...

  18. 40 CFR 52.134 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Compliance schedules. 52.134 Section 52.134 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Arizona § 52.134 Compliance schedules. (a)...

  19. 40 CFR 52.134 - Compliance schedules.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Compliance schedules. 52.134 Section 52.134 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Arizona § 52.134 Compliance schedules. (a)...

  20. 40 CFR 52.134 - Compliance schedules.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Compliance schedules. 52.134 Section 52.134 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Arizona § 52.134 Compliance schedules. (a)...

  1. Streams-C Scheduler and Library

    2001-12-04

    The scheduler accepts a preprocessed C program with optional Streams-C extensions. It translates it to a normalized form with additional information for scheduling it on a reconfigurable architecture. The resulting file is accepted by the Streams-C VHDL generator, not part of this package.

  2. 6 CFR 27.210 - Submissions schedule.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Submissions schedule. 27.210 Section 27.210 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.210 Submissions schedule. (a) Initial Submission....

  3. 49 CFR 665.21 - Scheduling.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... TRANSPORTATION BUS TESTING Operations § 665.21 Scheduling. (a) To schedule a bus for testing, a manufacturer shall contact the operator of FTA's bus testing program. Contact information and procedures are available on the operator's bus testing Web site, http://www.altoonabustest.com. (b) Upon contacting...

  4. 49 CFR 665.21 - Scheduling.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... TRANSPORTATION BUS TESTING Operations § 665.21 Scheduling. (a) To schedule a bus for testing, a manufacturer shall contact the operator of FTA's bus testing program. Contact information and procedures are available on the operator's bus testing Web site, http://www.altoonabustest.com. (b) Upon contacting...

  5. 33 CFR 242.6 - Fee schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... based on a Corps-wide average of estimated current costs for providing that level of service. (f) Review... most current cost data available. If necessary, the Fee Schedule will be revised after public notice... MANAGEMENT SERVICES PROGRAM ESTABLISHMENT OF FEES FOR COST RECOVERY § 242.6 Fee schedule. (a) General....

  6. 14 CFR 91.1029 - Flight scheduling and locating requirements.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... operations, or at other places designated by the program manager in the flight locating procedures, until the... Ownership Operations Program Management § 91.1029 Flight scheduling and locating requirements. (a) Each program manager must establish and use an adequate system to schedule and release program aircraft....

  7. 14 CFR 91.1029 - Flight scheduling and locating requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... operations, or at other places designated by the program manager in the flight locating procedures, until the... Ownership Operations Program Management § 91.1029 Flight scheduling and locating requirements. (a) Each program manager must establish and use an adequate system to schedule and release program aircraft....

  8. 38 CFR 1.515 - Disclosure of information to participate in state prescription drug monitoring programs.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... substance means any substance identified in 21 CFR part 1308 as a schedule II, III, IV, or V controlled... program, including a program approved by the Secretary of Health and Human Services under section 399O of... first-time request, and date of origin of the prescription. (3) Prescriber information. Examples...

  9. 38 CFR 1.515 - Disclosure of information to participate in state prescription drug monitoring programs.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... substance means any substance identified in 21 CFR part 1308 as a schedule II, III, IV, or V controlled... program, including a program approved by the Secretary of Health and Human Services under section 399O of... first-time request, and date of origin of the prescription. (3) Prescriber information. Examples...

  10. Job Scheduling Under the Portable Batch System

    NASA Technical Reports Server (NTRS)

    Henderson, Robert L.; Woodrow, Thomas S. (Technical Monitor)

    1995-01-01

    The typical batch queuing system schedules jobs for execution by a set of queue controls. The controls determine from which queues jobs may be selected. Within the queue, jobs are ordered first-in, first-run. This limits the set of scheduling policies available to a site. The Portable Batch System removes this limitation by providing an external scheduling module. This separate program has full knowledge of the available queued jobs, running jobs, and system resource usage. Sites are able to implement any policy expressible in one of several procedural language. Policies may range from "bet fit" to "fair share" to purely political. Scheduling decisions can be made over the full set of jobs regardless of queue or order. The scheduling policy can be changed to fit a wide variety of computing environments and scheduling goals. This is demonstrated by the use of PBS on an IBM SP-2 system at NASA Ames.

  11. 76 FR 33181 - Regulatory Review Schedule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-08

    ... processes. (76 FR 18457, April 4, 2011). The Commission's regulatory review process establishes a detailed... National Indian Gaming Commission 25 CFR Chapter III Regulatory Review Schedule AGENCY: National Indian... Notice of Consultation advising the public that the NIGC was conducting a comprehensive review of all...

  12. 76 FR 54408 - Regulatory Review Schedule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-01

    .... (76 FR 18457, April 4, 2011). The Commission's regulatory review process established a tribal... National Indian Gaming Commission 25 CFR Chapter III Regulatory Review Schedule AGENCY: National Indian..., 1441 L Street, NW., Suite 9100, Washington, DC 20005. Telephone: 202-632-7003; e-mail:...

  13. 76 FR 26967 - Regulatory Review Schedule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-10

    ... National Indian Gaming Commission 25 CFR Chapter III Regulatory Review Schedule AGENCY: National Indian... advising the public that the NIGC was conducting a comprehensive review of its regulations and requesting public comment on the process for conducting the regulatory review. On April 4, 2011, after holding...

  14. Medicare program; end-stage renal disease prospective payment system and quality incentive program; ambulance fee schedule; durable medical equipment; and competitive acquisition of certain durable medical equipment prosthetics, orthotics and supplies. Final rule.

    PubMed

    2011-11-10

    This final rule updates and makes certain revisions to the End-Stage Renal Disease (ESRD) prospective payment system (PPS) for calendar year (CY) 2012. We are also finalizing the interim final rule with comment period published on April 6, 2011, regarding the transition budget-neutrality adjustment under the ESRD PPS,. This final rule also sets forth requirements for the ESRD quality incentive program (QIP) for payment years (PYs) 2013 and 2014. In addition, this final rule revises the ambulance fee schedule regulations to conform to statutory changes. This final rule also revises the definition of durable medical equipment (DME) by adding a 3-year minimum lifetime requirement (MLR) that must be met by an item or device in order to be considered durable for the purpose of classifying the item under the Medicare benefit category for DME. Finally, this final rule implements certain provisions of section 154 of the Medicare Improvements for Patients and Providers Act of 2008 (MIPPA) related to the durable medical equipment, prosthetics, orthotics and supplies (DMEPOS) Competitive Acquisition Program and responds to comments received on an interim final rule published January 16, 2009, that implemented these provisions of MIPPA effective April 18, 2009. (See the Table of Contents for a listing of the specific issues addressed in this final rule.)

  15. 40 CFR 141.702 - Sampling schedules.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 141.702 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Enhanced Treatment for Cryptosporidium Source Water Monitoring Requirements § 141.702 Sampling schedules. (a) Systems required to conduct source water...

  16. 40 CFR 141.702 - Sampling schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 141.702 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Enhanced Treatment for Cryptosporidium Source Water Monitoring Requirements § 141.702 Sampling schedules. (a) Systems required to conduct source water...

  17. 40 CFR 141.702 - Sampling schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 141.702 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Enhanced Treatment for Cryptosporidium Source Water Monitoring Requirements § 141.702 Sampling schedules. (a) Systems required to conduct source water...

  18. 40 CFR 141.702 - Sampling schedules.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 141.702 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Enhanced Treatment for Cryptosporidium Source Water Monitoring Requirements § 141.702 Sampling schedules. (a) Systems required to conduct source water...

  19. Environmental surveillance master sampling schedule

    SciTech Connect

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington.

  20. Dedicated heterogeneous node scheduling including backfill scheduling

    DOEpatents

    Wood, Robert R.; Eckert, Philip D.; Hommes, Gregg

    2006-07-25

    A method and system for job backfill scheduling dedicated heterogeneous nodes in a multi-node computing environment. Heterogeneous nodes are grouped into homogeneous node sub-pools. For each sub-pool, a free node schedule (FNS) is created so that the number of to chart the free nodes over time. For each prioritized job, using the FNS of sub-pools having nodes useable by a particular job, to determine the earliest time range (ETR) capable of running the job. Once determined for a particular job, scheduling the job to run in that ETR. If the ETR determined for a lower priority job (LPJ) has a start time earlier than a higher priority job (HPJ), then the LPJ is scheduled in that ETR if it would not disturb the anticipated start times of any HPJ previously scheduled for a future time. Thus, efficient utilization and throughput of such computing environments may be increased by utilizing resources otherwise remaining idle.

  1. Environmental surveillance master sampling schedule

    SciTech Connect

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  2. Gang scheduling a parallel machine. Revision 1

    SciTech Connect

    Gorda, B.C.; Brooks, E.D. III

    1991-12-01

    Program development on parallel machines can be a nightmare of scheduling headaches. We have developed a portable time sharing mechanism to handle the problem of scheduling gangs of processes. User programs and their gangs of processes are put to sleep and awakened by the gang scheduler to provide a time sharing environment. Time quantum are adjusted according to priority queues and a system of fair share accounting. The initial platform for this software is the 128 processor BBN TC2000 in use in the Massively Parallel Computing Initiative at the Lawrence Livermore National Laboratory.

  3. Essential Components of Educational Programs on Biomedical Writing, Editing, and Publishing.

    PubMed

    Barroga, Edward; Vardaman, Maya

    2015-10-01

    The primary objective of educational programs on biomedical writing, editing, and publishing is to nurture ethical skills among local and international researchers and editors from diverse professional backgrounds. The mechanics, essential components, and target outcomes of these programs are described in this article. The mechanics covers the objectives, design, benefits, duration, participants and qualifications, program formats, administrative issues, and mentorship. The essential components consist of three core schedules: Schedule I Basic aspects of biomedical writing, editing, and communications; Schedule II Essential skills in biomedical writing, editing, and publishing; and Schedule III Interactive lectures on relevant topics. The target outcomes of the programs comprise knowledge acquisition, skills development, paper write-up, and journal publication. These programs add to the prestige and academic standing of the host institutions.

  4. Space communications scheduler: A rule-based approach to adaptive deadline scheduling

    NASA Technical Reports Server (NTRS)

    Straguzzi, Nicholas

    1990-01-01

    Job scheduling is a deceptively complex subfield of computer science. The highly combinatorial nature of the problem, which is NP-complete in nearly all cases, requires a scheduling program to intelligently transverse an immense search tree to create the best possible schedule in a minimal amount of time. In addition, the program must continually make adjustments to the initial schedule when faced with last-minute user requests, cancellations, unexpected device failures, quests, cancellations, unexpected device failures, etc. A good scheduler must be quick, flexible, and efficient, even at the expense of generating slightly less-than-optimal schedules. The Space Communication Scheduler (SCS) is an intelligent rule-based scheduling system. SCS is an adaptive deadline scheduler which allocates modular communications resources to meet an ordered set of user-specified job requests on board the NASA Space Station. SCS uses pattern matching techniques to detect potential conflicts through algorithmic and heuristic means. As a result, the system generates and maintains high density schedules without relying heavily on backtracking or blind search techniques. SCS is suitable for many common real-world applications.

  5. Immunization Schedules for Adults

    MedlinePlus

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedules for Adults in Easy-to-read Formats ... previous immunizations. View or Print a Schedule Recommended Immunizations for Adults (19 Years and Older) by Age ...

  6. Childhood Immunization Schedule

    MedlinePlus

    ... Recommendations Why Immunize? Vaccines: The Basics Instant Childhood Immunization Schedule Recommend on Facebook Tweet Share Compartir Get ... date. See Disclaimer for additional details. Based on Immunization Schedule for Children 0 through 6 Years of ...

  7. 49 CFR 237.101 - Scheduling of bridge inspections.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Scheduling of bridge inspections. 237.101 Section... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.101 Scheduling of bridge inspections. (a) Each bridge management program shall include a provision for scheduling...

  8. 49 CFR 237.101 - Scheduling of bridge inspections.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Scheduling of bridge inspections. 237.101 Section... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.101 Scheduling of bridge inspections. (a) Each bridge management program shall include a provision for scheduling...

  9. 49 CFR 237.101 - Scheduling of bridge inspections.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Scheduling of bridge inspections. 237.101 Section... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.101 Scheduling of bridge inspections. (a) Each bridge management program shall include a provision for scheduling...

  10. 20 CFR 614.12 - Schedules of remuneration.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Schedules of remuneration. 614.12 Section 614... COMPENSATION FOR EX-SERVICEMEMBERS Administration of UCX Program § 614.12 Schedules of remuneration. (a... Defense, a Schedule of Remuneration specifying the pay and allowances for each pay grade of members of...

  11. 24 CFR 982.517 - Utility allowance schedule.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... reasonable accommodation in accordance with 24 CFR part 8 to make the program accessible to and usable by the... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Utility allowance schedule. 982.517... Payment § 982.517 Utility allowance schedule. (a) Maintaining schedule. (1) The PHA must maintain...

  12. Reinforcement learning in scheduling

    NASA Technical Reports Server (NTRS)

    Dietterich, Tom G.; Ok, Dokyeong; Zhang, Wei; Tadepalli, Prasad

    1994-01-01

    The goal of this research is to apply reinforcement learning methods to real-world problems like scheduling. In this preliminary paper, we show that learning to solve scheduling problems such as the Space Shuttle Payload Processing and the Automatic Guided Vehicle (AGV) scheduling can be usefully studied in the reinforcement learning framework. We discuss some of the special challenges posed by the scheduling domain to these methods and propose some possible solutions we plan to implement.

  13. SHRED: a CPU scheduler for heterogeneous applications

    NASA Astrophysics Data System (ADS)

    Moonian, Oveeyen; Coulson, Geoff

    2005-03-01

    General purpose workstations must support a wide variety of application characteristics; but it is hard to find a single CPU scheduling scheme that satisfactorily schedules processes from all types of applications. It is particularly difficult to get periodic deadline-driven continuous media processes to satisfactorily co-exist with others. A number of schemes have been proposed to address this issue, but these all suffer from one or more of the following limitations: i) unacceptable inefficiency, ii) non-determinism (i.e. introducing significant burstiness or jitter), iii) inability to explicitly support deadlines (so that deadlines may be missed even when the CPU is underloaded). This paper presents "SHRED (SHaretokens, Round-robin, Earliest-deadline-first, Deferred-processing)" -an efficient, proportional-share, deterministic, scheduling scheme that enables periodic deadline-driven processes to meet their explicit deadlines wherever possible, and degrades gracefully and adaptively when this is not possible. The scheme simultaneously ensures that non-deadline processes always obtain their fair share of CPU time whether in conditions of underload or overload. For experimental evaluation, a prototype of SHRED has been developed by replacing the Linux standard scheduler with the SHRED scheduler. The prototype has been evaluated against the standard Linux scheduler for various parameters and also against two proportional-share schemes, namely Stride and VTRR scheduling, for its overhead and its effect on jitter.

  14. Block Scheduling. Research Brief

    ERIC Educational Resources Information Center

    Muir, Mike

    2003-01-01

    What are the effects of block scheduling? Results of transitioning from traditional to block scheduling are mixed. Some studies indicate no change in achievement results, nor change in teachers' opinions about instructional strategies. Other studies show that block scheduling doesn't work well for Advanced Placement or Music courses, that "hard to…

  15. AVLIS production plant project schedule and milestones

    SciTech Connect

    Not Available

    1984-11-15

    An AVLIS Production Plant Deployment Schedule for the engineering, procurement, and construction for both the Initial Increment of Production and the fully Activated Plant, has been developed by the project team consisting of Lawrence Livermore National Laboratory, Martin Marietta Energy Systems, Inc. with architect-engineer support from Bechtel National, Inc., Stone and Webster Engineering Corporation, and Westinghouse Corporation. The initial deployment phase consists of six separators modules and the three laser power amplifier modules consistent with the FY84 reference design with a name plate capacity of 5 million separative work units/yr followed by a full plant activation to approximately 13 million separative work units/yr. The AVLIS Production Plant project team's strategy for deployment schedule analysis focused on three schedule options: engineering limited schedule; authorization limited schedule; and funding limited project schedule. The three deployment schedule options developed by AVLIS project team have been classified in ranges such as an optimistic, rapid/moderate, or moderate/pessimistic based on the probability of meeting the individual schedule option's major milestones or program objectives of enriching uranium by the AVLIS process in an effective cost and schedule manner. 47 figures, 7 tables.

  16. SCHOOL SCHEDULING BY COMPUTER, THE STORY OF GASP.

    ERIC Educational Resources Information Center

    MURPHY, JUDITH; SUTTER, ROBERT

    GENERALIZED ACADEMIC SIMULATION PROGRAMS (GASP) IS SCHOOL SCHEDULING BY COMPUTER. THE PUBLICATION COMPARES THE MANUAL METHOD OF DEVELOPING A SCHOOL SCHEDULE WITH THE NEW METHOD OF COMPUTER PROGRAMING. A MAJOR ADVANTAGE OF COMPUTER PROGRAMING IS THAT IT RELIEVES THE ADMINISTRATOR OF THIS BUSY WORK SO THAT HE CAN DEVOTE HIS ENERGIES AND TIME TO MORE…

  17. School Scheduling by Computer, the Story of GASP.

    ERIC Educational Resources Information Center

    Murphy, Judith; Sutter, Robert

    Generalized academic simulation programs (GASP) is school scheduling by computer. The publication compares the manual method of developing a school schedule with the new method of computer programing. A major advantage of computer programing is that it relieves the administrator of this busy work so that he can devote his energies and time to more…

  18. Fixed Schedules Can Support 21st-Century Skills

    ERIC Educational Resources Information Center

    Formanack, Gail; Pietsch, Laura

    2011-01-01

    The common belief among school librarians is that a flexibly scheduled school library program as opposed to a fixed schedule program is the best choice. After all, there are distinct advantages to the flexible program: students are served at the point of need, skills are not taught in isolation, and collaborative lessons are developed with…

  19. The Probability of Small Schedule Values and Preference for Random-Interval Schedules

    ERIC Educational Resources Information Center

    Soreth, Michelle Ennis; Hineline, Philip N.

    2009-01-01

    Preference for working on variable schedules and temporal discrimination were simultaneously examined in two experiments using a discrete-trial, concurrent-chains arrangement with fixed interval (FI) and random interval (RI) terminal links. The random schedule was generated by first sampling a probability distribution after the programmed delay to…

  20. The Quality of Student Experiences in Traditionally Scheduled Courses versus Block Scheduled Courses at Pearl River Community College

    ERIC Educational Resources Information Center

    Alsobrooks, David Scott

    2010-01-01

    The purpose of this study was to determine if students at Pearl River Community College (PRCC) achieve significantly different self-reported Quality of Effort levels when enrolled in block scheduled programs than students enrolled in traditionally scheduled programs. This study focuses on Career and Technical Education (CTE) programs at PRCC in…

  1. NASA scheduling technologies

    NASA Technical Reports Server (NTRS)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  2. Oversight of Institutional Aid Programs, 1981. Hearing before the Subcommittee on Education, Arts and Humanities of the Committee on Labor and Human Resources, United States Senate, Ninety-Seventh Congress, First Session, on Oversight of Title III of the Higher Education Act, Developing Institutions Programs.

    ERIC Educational Resources Information Center

    Congress of the U.S., Washington, DC. Senate Subcommittee on Education, Arts and Humanities.

    Testimonies are presented from U.S. Senate hearings on oversight of Title III of the Higher Education Act, Developing Institutions Programs. The new eligibility criteria established by the Education Amendment of 1980 for schools seeking to compete for grants under the Title III institutional aid programs are being reconsidered. The institutional…

  3. 40 CFR 147.2650 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... those on Indian lands, is the program administered by Puerto Rico's Environmental Quality Board (EQB), approved by the EPA pursuant to the Safe Drinking Water Act (SDWA) section 1422. This program consists of... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND...

  4. School Community Education Program in New York City, 1984-85. Volume III: OEA Final Evaluation Report.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn. Office of Educational Assessment.

    In 1984-85, the New York City Public Schools received $2,374,686 from the state legislature to operate the School Community Education Program (also known as the Umbrella Program). The program consisted of 46 different projects designed to provide innovative solutions to local educational and school problems. Thirteen of these projects are…

  5. NASA Instrument Cost/Schedule Model

    NASA Technical Reports Server (NTRS)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  6. Routine Operational Environmental Monitoring schedule, CY 1994

    SciTech Connect

    Schmidt, J.W.

    1993-12-01

    This document provides Health Physics (HP) a schedule in accordance with the Environmental Compliance Manual, WHC-CM-7-5, of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) Program during calendar year (CY) 1994. The survey frequencies for particular sites are determined by the technical judgment of EES and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive waste sites are scheduled to be surveyed annually at a minimum. Any newly discovered waste sites not documented by this schedule will be included in the revised schedule for CY 1995. This schedule does not discuss the manpower needs nor does it list the monitoring equipment to be used in completing specific routines.

  7. Space station payload operations scheduling with ESP2

    NASA Technical Reports Server (NTRS)

    Stacy, Kenneth L.; Jaap, John P.

    1988-01-01

    The Mission Analysis Division of the Systems Analysis and Integration Laboratory at the Marshall Space Flight Center is developing a system of programs to handle all aspects of scheduling payload operations for Space Station. The Expert Scheduling Program (ESP2) is the heart of this system. The task of payload operations scheduling can be simply stated as positioning the payload activities in a mission so that they collect their desired data without interfering with other activities or violating mission constraints. ESP2 is an advanced version of the Experiment Scheduling Program (ESP) which was developed by the Mission Integration Branch beginning in 1979 to schedule Spacelab payload activities. The automatic scheduler in ESP2 is an expert system that embodies the rules that expert planners would use to schedule payload operations by hand. This scheduler uses depth-first searching, backtracking, and forward chaining techniques to place an activity so that constraints (such as crew, resources, and orbit opportunities) are not violated. It has an explanation facility to show why an activity was or was not scheduled at a certain time. The ESP2 user can also place the activities in the schedule manually. The program offers graphical assistance to the user and will advise when constraints are being violated. ESP2 also has an option to identify conflict introduced into an existing schedule by changes to payload requirements, mission constraints, and orbit opportunities.

  8. Detailed leak detection test plan and schedule for the Oak Ridge National Laboratory LLLW active tanks. Waste Management and Environmental Restoration Programs

    SciTech Connect

    Douglas, D.G.; Maresca, J.W. Jr.

    1993-03-01

    This document provides a detailed leak detection test plan and schedule for leak testing many of the tanks that comprise the active portion of the liquid low-level waste (LLLW) system at the Oak Ridge National Laboratory (ORNL). This plan was prepared in response to the requirements of the Federal Facility Agreement (FFA) between the US Department of Energy (DOE) and two other agencies, the US Environmental Protection Agency (EPA) and the Tennessee Department of Environment and Conservation (TDEC).

  9. Integrated resource scheduling in a distributed scheduling environment

    NASA Technical Reports Server (NTRS)

    Zoch, David; Hall, Gardiner

    1988-01-01

    The Space Station era presents a highly-complex multi-mission planning and scheduling environment exercised over a highly distributed system. In order to automate the scheduling process, customers require a mechanism for communicating their scheduling requirements to NASA. A request language that a remotely-located customer can use to specify his scheduling requirements to a NASA scheduler, thus automating the customer-scheduler interface, is described. This notation, Flexible Envelope-Request Notation (FERN), allows the user to completely specify his scheduling requirements such as resource usage, temporal constraints, and scheduling preferences and options. The FERN also contains mechanisms for representing schedule and resource availability information, which are used in the inter-scheduler inconsistency resolution process. Additionally, a scheduler is described that can accept these requests, process them, generate schedules, and return schedule and resource availability information to the requester. The Request-Oriented Scheduling Engine (ROSE) was designed to function either as an independent scheduler or as a scheduling element in a network of schedulers. When used in a network of schedulers, each ROSE communicates schedule and resource usage information to other schedulers via the FERN notation, enabling inconsistencies to be resolved between schedulers. Individual ROSE schedules are created by viewing the problem as a constraint satisfaction problem with a heuristically guided search strategy.

  10. A scheduling model for astronomy

    NASA Astrophysics Data System (ADS)

    Solar, M.; Michelon, P.; Avarias, J.; Garces, M.

    2016-04-01

    Astronomical scheduling problem has several external conditions that change dynamically at any time during observations, like weather condition (humidity, temperature, wind speed, opacity, etc.), and target visibility conditions (target over the horizon, Sun/Moon blocking the target). Therefore, a dynamic re-scheduling is needed. An astronomical project will be scheduled as one or more Scheduling Blocks (SBs) as an atomic unit of astronomical observations. We propose a mixed integer linear programming (MILP) solution to select the best SBs, favors SBs with high scientific values, and thus maximizing the quantity of completed observation projects. The data content of Atacama Large Millimeter/Submillimeter Array (ALMA) projects of cycle 0 and cycle 1 were analyzed, and a synthetic set of tests of the real instances was created. Two configurations, one of 5000 SBs in a 3 months season and another 10,000 SBs a 6 months season were created. These instances were evaluated with excellent results. Through the testing it is showed that the MILP proposal has optimal solutions.

  11. The Composition of the Master Schedule

    NASA Technical Reports Server (NTRS)

    Thomas, Cynthia C.; Behrend, Dirk; MacMillan, Daniel S.

    2010-01-01

    Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.

  12. Monitoring Building Systems for Schedule Compliance

    SciTech Connect

    Jensen, Andrew M.; Belew, Shan T.

    2013-02-19

    As Pacific Northwest National Laboratory (PNNL) initiated a Core Business Hours program, it became a challenge to ensure that the hundreds of systems campus wide were operating within their programmed schedules. Therefore, a collaborative exchange between PNNL operations and PNNL researchers developing the Decision Support for Operations and Maintenance (DSOM) software package was initiated to create a tool to solve this problem. This new DSOM tool verifies systems are operating within scheduled operation times by polling Building Automation and Control Network (BACnet) identifiers of systems’ on/off or command statuses. The tool records the time spent in operation state (ON) and totalizes each system over a rolling 7-day period, highlighting systems that are running over the scheduled hours. This snapshot view allows building management to look quickly at the entire campus to ensure that systems are not operating beyond their scheduled hours.

  13. Intelligent scheduling support for the US Coast Guard

    SciTech Connect

    Darby-Dowman, K.; Lucas, C.; Mitra, G.; Fink, R.; Kingsley, L.; Smith, J.W.

    1992-12-31

    This paper will discuss a joint effort by the U.S. Coast Guard Research & Development Center, Idaho National Engineering Laboratory and Brunel University to provide the necessary tools to increase the human scheduler`s capability to handle the scheduling process more efficiently and effectively. Automating the scheduling process required a system that could think independently of the scheduler, that is, the systems needed its own control mechanism and knowledge base. Further, automated schedule generation became a design requirement and sophisticated algorithms were formulated to solve a complex combinatorial problem. In short, the resulting design can be viewed as a hybrid knowledge-based mathematical programming application system. This document contains an overview of the integrated system, a discrete optimization model for scheduling, and schedule diagnosis and analysis.

  14. Automated telescope scheduling

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.

    1988-01-01

    With the ever increasing level of automation of astronomical telescopes the benefits and feasibility of automated planning and scheduling are becoming more apparent. Improved efficiency and increased overall telescope utilization are the most obvious goals. Automated scheduling at some level has been done for several satellite observatories, but the requirements on these systems were much less stringent than on modern ground or satellite observatories. The scheduling problem is particularly acute for Hubble Space Telescope: virtually all observations must be planned in excruciating detail weeks to months in advance. Space Telescope Science Institute has recently made significant progress on the scheduling problem by exploiting state-of-the-art artificial intelligence software technology. What is especially interesting is that this effort has already yielded software that is well suited to scheduling groundbased telescopes, including the problem of optimizing the coordinated scheduling of more than one telescope.

  15. The range scheduling aid

    NASA Technical Reports Server (NTRS)

    Halbfinger, Eliezer M.; Smith, Barry D.

    1991-01-01

    The Air Force Space Command schedules telemetry, tracking and control activities across the Air Force Satellite Control network. The Range Scheduling Aid (RSA) is a rapid prototype combining a user-friendly, portable, graphical interface with a sophisticated object-oriented database. The RSA has been a rapid prototyping effort whose purpose is to elucidate and define suitable technology for enhancing the performance of the range schedulers. Designing a system to assist schedulers in their task and using their current techniques as well as enhancements enabled by an electronic environment, has created a continuously developing model that will serve as a standard for future range scheduling systems. The RSA system is easy to use, easily ported between platforms, fast, and provides a set of tools for the scheduler that substantially increases his productivity.

  16. Environmental surveillance master sampling schedule

    SciTech Connect

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  17. Superfund TIO videos. Set A. Regulatory overview - CERCLA's relationship to other programs: RCRA, Title III, UST, CWA, SDWA. Part 1. Audio-Visual

    SciTech Connect

    Not Available

    1990-01-01

    The videotape is divided into five sections. Section 1 provides definitions and historical information on both the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The four types of RCRA regulatory programs - Subtitles C, D, I, and J - are described. Treatment, storage, and disposal (TSD) and recycling facilities are also discussed. Section 2 discusses the history behind the Emergency Planning and Community Right-to-Know Act (Title III). The four major provisions of Title III, which are emergency planning, emergency release notification, community right-to-know reporting, and the toxic chemical release inventory are covered. Section 3 outlines the UST program covering notification, record keeping, and the UST Trust Fund. Section 4 outlines the six major provisions of the Clean Water Act (CWA): water quality, pretreatment, prevention of oil and hazardous substance discharges, responses to oil and hazardous substance discharges, discharges of hazardous substances into the ocean, and dredge and fill. Section 5 explains the purpose, regulations, and standards of the Safe Drinking Water Act (SDWA). Specific issues such as underground injection, sole source aquifers, and lead contamination are discussed.

  18. Chemistry - Part III, An Introduction to Organic Chemistry: Student Workbook for the Thirteen-College Curriculum Program.

    ERIC Educational Resources Information Center

    Booker, Edward; And Others

    This booklet is a student manual in a series of booklets that make up the core of a Physical Science course designed for the freshman year of college and used by teachers in the 27 colleges participating in the Thirteen College curriculum Program. This program is a curriculum revision project in support of 13 predominantly Negro colleges and…

  19. Chemistry - Part III, An Introduction to Organic Chemistry: Teacher's Curriculum Guide for the Thirteen-College Curriculum Program.

    ERIC Educational Resources Information Center

    Booker, Edward; And Others

    This booklet is a teacher's manual in a series of booklets that make up the core of a Physical Science course designed for the freshman year of college and used by teachers in the Thirteen College Curriculum Program. This program is a curriculum revision project in support of 13 predominantly Negro colleges and reflects educational research in the…

  20. Evaluation of Flexibility Under "No Child Left Behind": Volume III--The Rural Education Achievement Program (REAP Flex)

    ERIC Educational Resources Information Center

    Christensen, Gayle S.; Amerikaner, Ary; Klasik, Daniel; Cohodes, Sarah

    2007-01-01

    This study focuses on flexibility provisions in the Rural Education Achievement Program (REAP) provision of NCLB. Specifically, it addresses REAP Flex, a program that allows rural districts additional control over how to spend portions of their federal funding. REAP Flex is part of a series of NCLB flexibility initiatives aimed at rural schools.…

  1. 40 CFR 147.2800 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION... Commonwealth of the Northern Mariana Islands, other than those on Indian lands, is the program administered by the Commonwealth of the Northern Mariana Islands Division of Environmental Quality approved by...

  2. The Role of Organizational Context and External Influences in the Implementation of Evidence-Based Programs. Report III

    ERIC Educational Resources Information Center

    Metz, Allison; Burkhauser, Mary; Collins, Ashleigh; Bandy, Tawana

    2008-01-01

    The implementation of programs and practices that reflect the best available research and evaluation is a new and very promising development in the out-of-school time field. However, successfully implementing a new, evidence-based program or practice is a major challenge for practitioners. This challenge is due, in large part, to a lack of…

  3. 40 CFR 147.2650 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...), approved by the EPA pursuant to the Safe Drinking Water Act (SDWA) section 1422. This program consists of... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION... the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained...

  4. 40 CFR 147.2650 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...), approved by the EPA pursuant to the Safe Drinking Water Act (SDWA) section 1422. This program consists of... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION... the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained...

  5. 40 CFR 147.2650 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...), approved by the EPA pursuant to the Safe Drinking Water Act (SDWA) section 1422. This program consists of... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION... the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained...

  6. 40 CFR 147.2650 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...), approved by the EPA pursuant to the Safe Drinking Water Act (SDWA) section 1422. This program consists of... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION... the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Copies may be obtained...

  7. Classroom Breakfast Scores High in Maryland: Findings from Year III of the Maryland Meals for Achievement Classroom Breakfast Pilot Program.

    ERIC Educational Resources Information Center

    Maryland State Dept. of Education, Baltimore.

    In fall 1998, the Maryland State Department of Education and six schools began a pilot program to evaluate the impact of serving breakfast to students in the classroom as part of the school day. Students in participating schools have an opportunity to eat breakfast in their classroom each day at no charge, regardless of family income. The program,…

  8. 40 CFR 147.650 - State-administrative program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-108 (Bobbs-Merrill 1977); (4) Drainage-Water Rights and Reclamation, Title 42, Chapter 2, Idaho Code... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION... the program administered by the Idaho Department of Water Resources, approved by EPA pursuant...

  9. 40 CFR 147.650 - State-administrative program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-108 (Bobbs-Merrill 1977); (4) Drainage-Water Rights and Reclamation, Title 42, Chapter 2, Idaho Code... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION... the program administered by the Idaho Department of Water Resources, approved by EPA pursuant...

  10. 40 CFR 147.1601 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... lands, is the program administered by the New Mexico Water Quality Control Commission, the Environmental... Water Quality Control Commission Regulations (WQCC 82-1) sections 1-100 through 5-300 (September 20..., are also part of the approved State-administered UIC program: (1) Water Quality Act, New...

  11. 40 CFR 147.1601 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... lands, is the program administered by the New Mexico Water Quality Control Commission, the Environmental... Water Quality Control Commission Regulations (WQCC 82-1) sections 1-100 through 5-300 (September 20..., are also part of the approved State-administered UIC program: (1) Water Quality Act, New...

  12. SUPERSTARS III: 3-5.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Education, Raleigh.

    SUPERSTARS III is a K-8 program designed as an enrichment opportunity for self-directed learners in mathematics. The basic purpose of SUPERSTARS III is to provide the extra challenge that self-motivated students need in mathematics and to do so in a structured, long-term program that does not impinge on the normal classroom routine or the…

  13. SUPERSTARS III: 6-8.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Education, Raleigh.

    SUPERSTARS III is a K-8 program designed as an enrichment opportunity for self-directed learners in mathematics. The basic purpose of SUPERSTARS III is to provide the extra challenge that self-motivated students need in mathematics and to do so in a structured, long-term program that does not impinge on the normal classroom routine or the…

  14. Demonstration program for coal-oil mixture combustion in an electric utility boiler - Category III A. 1978 annual report

    SciTech Connect

    Not Available

    1980-04-01

    The 1978 annual report covers New England Power Service Company's participation in the Department of Energy coal-oil mixture (COM) program. Continued world-wide unrest resulting in an unstable fuel oil supply coupled with rapidly inflating costs have caused continued interest in a demonstrable viable solution. NEPSCO's program, while not attaining all the milestones forecast, has made considerable progress. As of January 31, 1979, ninety-five (95% percent of engineering and design has been completed. Construction of facilities and installation of required equipment was approximately 75% complete and the six-week Feasibility Testing program was expected to commence during April 1979.

  15. A survey of planning and scheduling research at the NASA Ames Research Center

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1989-01-01

    NASA Ames Research Center has a diverse program in planning and scheduling. Some research projects as well as some applications are highlighted. Topics addressed include machine learning techniques, action representations and constraint-based scheduling systems. The applications discussed are planetary rovers, Hubble Space Telescope scheduling, and Pioneer Venus orbit scheduling.

  16. Schedule and status of irradiation experiments

    SciTech Connect

    Rowcliffe, A.F.; Grossbeck, M.L.

    1997-04-01

    To provide an updated summary of the status of irradiation experiments for the neutron-interactive materials program. The current status of reactor irradiation experiments is presented in tables summarizing the experimental objectives, conditions, and schedule. Currently, the program has two irradiation experiments in reactor; and 8 experiments in the planning or design stages. Postirradiation examination and testing is in progress on 18 experiments.

  17. 14 CFR 91.1029 - Flight scheduling and locating requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Ownership Operations Program Management § 91.1029 Flight scheduling and locating requirements. (a) Each... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Flight scheduling and locating requirements... operations, or at other places designated by the program manager in the flight locating procedures, until...

  18. 40 CFR 144.53 - Schedule of compliance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 24 2013-07-01 2013-07-01 false Schedule of compliance. 144.53 Section 144.53 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM Permit Conditions § 144.53 Schedule of compliance. (a) General....

  19. 40 CFR 144.53 - Schedule of compliance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 23 2011-07-01 2011-07-01 false Schedule of compliance. 144.53 Section 144.53 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM Permit Conditions § 144.53 Schedule of compliance. (a) General....

  20. 40 CFR 144.53 - Schedule of compliance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 23 2014-07-01 2014-07-01 false Schedule of compliance. 144.53 Section 144.53 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM Permit Conditions § 144.53 Schedule of compliance. (a) General....

  1. 40 CFR 144.53 - Schedule of compliance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 24 2012-07-01 2012-07-01 false Schedule of compliance. 144.53 Section 144.53 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM Permit Conditions § 144.53 Schedule of compliance. (a) General....

  2. Guidelines for successful self-scheduling on nursing units.

    PubMed

    Russell, Elizabeth; Hawkins, Jenna; Arnold, Kara A

    2012-09-01

    Self-scheduling programs are an increasingly popular strategy utilized by employers to address the individual and organizational challenges resulting from employee work-life imbalance among the nursing workforce. Certain key components will ensure buy-in and support from staff when self-scheduling programs are developed. PMID:22922749

  3. Mixed-Integer Formulations for Constellation Scheduling

    NASA Astrophysics Data System (ADS)

    Valicka, C.; Hart, W.; Rintoul, M.

    Remote sensing systems have expanded the set of capabilities available for and critical to national security. Cooperating, high-fidelity sensing systems and growing mission applications have exponentially increased the set of potential schedules. A definitive lack of advanced tools places an increased burden on operators, as planning and scheduling remain largely manual tasks. This is particularly true in time-critical planning activities where operators aim to accomplish a large number of missions through optimal utilization of single or multiple sensor systems. Automated scheduling through identification and comparison of alternative schedules remains a challenging problem applicable across all remote sensing systems. Previous approaches focused on a subset of sensor missions and do not consider ad-hoc tasking. We have begun development of a robust framework that leverages the Pyomo optimization modeling language for the design of a tool to assist sensor operators planning under the constraints of multiple concurrent missions and uncertainty. Our scheduling models have been formulated to address the stochastic nature of ad-hoc tasks inserted under a variety of scenarios. Operator experience is being leveraged to select appropriate model objectives. Successful development of the framework will include iterative development of high-fidelity mission models that consider and expose various schedule performance metrics. Creating this tool will aid time-critical scheduling by increasing planning efficiency, clarifying the value of alternative modalities uniquely provided by multi-sensor systems, and by presenting both sets of organized information to operators. Such a tool will help operators more quickly and fully utilize sensing systems, a high interest objective within the current remote sensing operations community. Preliminary results for mixed-integer programming formulations of a sensor scheduling problem will be presented. Assumptions regarding sensor geometry

  4. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    NASA Technical Reports Server (NTRS)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  5. Scheduling: Seven Period Day

    ERIC Educational Resources Information Center

    Williamson, Ronald

    2010-01-01

    Driven by stable or declining financial resources many school districts are considering the costs and benefits of a seven-period day. While there is limited evidence that any particular scheduling model has a greater impact on student learning than any other, it is clear that the school schedule is a tool that can significantly impact teacher…

  6. A Fluid Block Schedule

    ERIC Educational Resources Information Center

    Ubben, Gerald C.

    1976-01-01

    Achieving flexibility without losing student accountability is a challenge that faces every school. With a fluid block schedule, as described here, accountability is maintained without inhibiting flexibility. An additional advantage is that three levels of schedule decision making take some of the pressure off the principal. (Editor)

  7. Surviving Block Scheduling.

    ERIC Educational Resources Information Center

    Haley, Marjorie

    A discussion of block scheduling for second language instruction looks at the advantages and disadvantages and offers some suggestions for classroom management and course organization. It is argued that block scheduling may offer a potential solution to large classes, insufficient time for labs, too little individualized instruction; few…

  8. Fundamentals of School Scheduling.

    ERIC Educational Resources Information Center

    Schroth, Gwen

    The ability of the school administrator to schedule teachers' and students' time so that each receives the most from each school day has become an essential skill. This book has been prepared for school administrators at the elementary and middle school levels who need appropriate management techniques for scheduling students into classes. Chapter…

  9. Range Scheduling Aid (RSA)

    NASA Technical Reports Server (NTRS)

    Logan, J. R.; Pulvermacher, M. K.

    1991-01-01

    Range Scheduling Aid (RSA) is presented in the form of the viewgraphs. The following subject areas are covered: satellite control network; current and new approaches to range scheduling; MITRE tasking; RSA features; RSA display; constraint based analytic capability; RSA architecture; and RSA benefits.

  10. What's behind Block Scheduling?

    ERIC Educational Resources Information Center

    Gierke, Carolyn

    1999-01-01

    Discussion of block scheduling in secondary schools focuses on its impact on the school library media center. Discusses increased demand for library services, scheduling classes, the impact on librarians' time, teaching information technology, local area networks, and the increased pace of activity. (LRW)

  11. Transportation Baseline Schedule

    SciTech Connect

    Fawcett, Ricky Lee; John, Mark Earl

    2000-01-01

    The “1999 National Transportation Program - Transportation Baseline Report” presents data that form a baseline to enable analysis and planning for future Department of Energy (DOE) Environmental Management (EM) waste/material transportation. The companion “1999 Transportation ‘Barriers’ Analysis” analyzes the data and identifies existing and potential problems that may prevent or delay transportation activities based on the data presented. The “1999 Transportation Baseline Schedule” (this report) uses the same data to provide an overview of the transportation activities of DOE EM waste/materials. This report can be used to identify areas where stakeholder interface is needed, and to communicate to stakeholders the quantity/schedule of shipments going through their area. Potential bottlenecks in the transportation system can be identified; the number of packages needed, and the capacity needed at receiving facilities can be planned. This report offers a visualization of baseline DOE EM transportation activities for the 11 major sites and the “Geologic Repository Disposal” site (GRD).

  12. DSN Resource Scheduling

    NASA Technical Reports Server (NTRS)

    Wang, Yeou-Fang; Baldwin, John

    2007-01-01

    TIGRAS is client-side software, which provides tracking-station equipment planning, allocation, and scheduling services to the DSMS (Deep Space Mission System). TIGRAS provides functions for schedulers to coordinate the DSN (Deep Space Network) antenna usage time and to resolve the resource usage conflicts among tracking passes, antenna calibrations, maintenance, and system testing activities. TIGRAS provides a fully integrated multi-pane graphical user interface for all scheduling operations. This is a great improvement over the legacy VAX VMS command line user interface. TIGRAS has the capability to handle all DSN resource scheduling aspects from long-range to real time. TIGRAS assists NASA mission operations for DSN tracking of station equipment resource request processes from long-range load forecasts (ten years or longer), to midrange, short-range, and real-time (less than one week) emergency tracking plan changes. TIGRAS can be operated by NASA mission operations worldwide to make schedule requests for the DSN station equipment.

  13. SAGE III

    Atmospheric Science Data Center

    2016-06-15

    SAGE III Data and Information The Stratospheric Aerosol and Gas ... on the spacecraft. SAGE III produced L1 and L2 scientific data from 5/07/2002 until 12/31/2005. The flight of the second instrument is as ... Guide Documents:  Project Guide Data Products User's Guide  (PDF) Relevant Documents:  ...

  14. An examination of preactivity and postactivity stretching practices of NCAA division I, NCAA division II, and NCAA division III track and field throws programs.

    PubMed

    Judge, Lawrence W; Bellar, David M; Gilreath, Erin L; Petersen, Jeffrey C; Craig, Bruce W; Popp, Jennifer K; Hindawi, Omar S; Simon, Laura S

    2013-10-01

    The purpose of this study is to determine the pre- and postactivity stretching practices of Division I, II, and III track and field throws programs. A 33-item survey instrument was developed to collect data regarding the warm-up and flexibility practices at the National Collegiate Athletic Association (NCAA) Division I (n = 320), Division II (n = 175), and Division III (n = 275) universities. A total of 135 surveys were completed for a 17.5% return rate, and although the response rate was generally low, it did mirror the distribution percentages of the 3 divisions. Significant differences were found for the level of United States Track and Field (USATF) certification and the use of static stretching (SS) between throws (χ = 6.333, p = 0.048). Significance was also found for the USATF certification level and athletic trainer (AT) assistance in performing SS (χ = 13.598, p = 0.01). Significant differences were also found for the NCAA division levels and the use of soft tissue mobilization (χ = 5.913, p = 0.026). Although research supports dynamic warm-up/stretching over other forms of preactivity protocols, it seems that some track-and-field throws coaches are reluctant to completely discontinue preactivity SS. The results of this study suggest that it is necessary for track and field throws coaches to reevaluate their own practices, perhaps better aligning them with current research findings.

  15. Analysis of the Competency-Based High School Diploma Program for CETA Clients. Report III: Student/Client Completion Results.

    ERIC Educational Resources Information Center

    McMillan, Samuel H., Jr.

    A study examined the student/client completion of a competency-based high school diploma for CETA clients. Using follow-up forms, attendance records, correspondence, telephone calls, and client information sheets, researchers collected data from clients and staff pertaining to 102 of the 238 program clients from five sites in Texas (Abilene,…

  16. 76 FR 77982 - Applications for Eligibility Designation; Programs Under Parts A and F of Title III of the Higher...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-15

    ..., 2010 (75 FR 44055) (PPOHA NFP). Among the requirements established for the PPOHA Program in the PPOHA.... Department of Health and Human Services in the Federal Register on January 23, 2009 (74 FR 4199). The..., published in the Federal Register on July 27, 2010 (75 FR 44055). Note: There are no...

  17. 40 CFR 147.2200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., and 281. (ii) Vernon's Texas Codes Annotated, Water Code, Chapters 5, 7, 26, and 32, Health and Safety... the Texas Natural Resource Conservation Commission a predecessor to the Texas Commission on... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND...

  18. 40 CFR 147.2200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., and 281. (ii) Vernon's Texas Codes Annotated, Water Code, Chapters 5, 7, 26, and 32, Health and Safety... the Texas Natural Resource Conservation Commission a predecessor to the Texas Commission on... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND...

  19. 40 CFR 147.2200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., and 281. (ii) Vernon's Texas Codes Annotated, Water Code, Chapters 5, 7, 26, and 32, Health and Safety... the Texas Natural Resource Conservation Commission a predecessor to the Texas Commission on... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND...

  20. 40 CFR 147.2200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., and 281. (ii) Vernon's Texas Codes Annotated, Water Code, Chapters 5, 7, 26, and 32, Health and Safety... the Texas Natural Resource Conservation Commission a predecessor to the Texas Commission on... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND...

  1. 40 CFR 147.2200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., and 281. (ii) Vernon's Texas Codes Annotated, Water Code, Chapters 5, 7, 26, and 32, Health and Safety... the Texas Natural Resource Conservation Commission a predecessor to the Texas Commission on... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND...

  2. 40 CFR 147.200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the program administered by the Arkansas Department of Pollution Control and Ecology approved by EPA... Code, Department of Pollution Control and Ecology, promulgated January 22, 1982; (4) General Rule and... Management Code, Department of Pollution Control and Ecology, promulgated August 21, 1981. (b) The...

  3. 40 CFR 147.2400 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Indian lands, is the program administered by the Washington Department of Ecology, approved by EPA..., chapter 43.21A (Bureau of National Affairs, 1980 Laws), entitled “Department of Ecology,” as amended by...) The Memorandum of Agreement between EPA Region X and the Washington Department of Ecology, signed...

  4. 40 CFR 147.2400 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Indian lands, is the program administered by the Washington Department of Ecology, approved by EPA..., chapter 43.21A (Bureau of National Affairs, 1980 Laws), entitled “Department of Ecology,” as amended by...) The Memorandum of Agreement between EPA Region X and the Washington Department of Ecology, signed...

  5. 40 CFR 147.2400 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Indian lands, is the program administered by the Washington Department of Ecology, approved by EPA..., chapter 43.21A (Bureau of National Affairs, 1980 Laws), entitled “Department of Ecology,” as amended by...) The Memorandum of Agreement between EPA Region X and the Washington Department of Ecology, signed...

  6. 40 CFR 147.2400 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Indian lands, is the program administered by the Washington Department of Ecology, approved by EPA..., chapter 43.21A (Bureau of National Affairs, 1980 Laws), entitled “Department of Ecology,” as amended by...) The Memorandum of Agreement between EPA Region X and the Washington Department of Ecology, signed...

  7. 40 CFR 147.200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the program administered by the Arkansas Department of Pollution Control and Ecology approved by EPA... Code, Department of Pollution Control and Ecology, promulgated January 22, 1982; (4) General Rule and... Management Code, Department of Pollution Control and Ecology, promulgated August 21, 1981. (b) The...

  8. 40 CFR 147.2400 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Indian lands, is the program administered by the Washington Department of Ecology, approved by EPA..., chapter 43.21A (Bureau of National Affairs, 1980 Laws), entitled “Department of Ecology,” as amended by...) The Memorandum of Agreement between EPA Region X and the Washington Department of Ecology, signed...

  9. 40 CFR 147.200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the program administered by the Arkansas Department of Pollution Control and Ecology approved by EPA... Code, Department of Pollution Control and Ecology, promulgated January 22, 1982; (4) General Rule and... Management Code, Department of Pollution Control and Ecology, promulgated August 21, 1981. (b) The...

  10. 40 CFR 147.200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the program administered by the Arkansas Department of Pollution Control and Ecology approved by EPA... Code, Department of Pollution Control and Ecology, promulgated January 22, 1982; (4) General Rule and... Management Code, Department of Pollution Control and Ecology, promulgated August 21, 1981. (b) The...

  11. 40 CFR 147.200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the program administered by the Arkansas Department of Pollution Control and Ecology approved by EPA... Code, Department of Pollution Control and Ecology, promulgated January 22, 1982; (4) General Rule and... Management Code, Department of Pollution Control and Ecology, promulgated August 21, 1981. (b) The...

  12. 40 CFR 147.301 - EPA-administered program-Class I, III, IV, V wells and Indian lands.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... EPA-administered wells in Colorado other than Class II wells on the lands of the Ute Mountain Ute consists of the UIC program requirements of 40 CFR parts 124, 144, 146, 148, and any additional... in Colorado, including Indian lands, except for Class II wells on lands of the Ute Mountain Ute,...

  13. 40 CFR 147.301 - EPA-administered program-Class I, III, IV, V wells and Indian lands.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... EPA-administered wells in Colorado other than Class II wells on the lands of the Ute Mountain Ute consists of the UIC program requirements of 40 CFR parts 124, 144, 146, 148, and any additional... in Colorado, including Indian lands, except for Class II wells on lands of the Ute Mountain Ute,...

  14. Developmental Handicaps: Prevention and Treatment, III. A Cooperative Project between University Affiliated Facilities and State MCH/CC Programs.

    ERIC Educational Resources Information Center

    John F. Kennedy Inst., Baltimore, MD.

    Third in a series on the prevention and treatment of developmental handicaps, this publication focuses on linkages among the network of university affiliated facilities (UAFs) and Title V Maternal and Child Health Programs. Four papers in Section I address the following developmental issues as of 1985: "Serious Viral Infection in Developmentally…

  15. The Employers III: A Survey of Employers Who Have Hired Career Program Graduates of Montgomery Community College.

    ERIC Educational Resources Information Center

    Gell, Robert L.; And Others

    As part of a student follow-up system, a survey was conducted of employers of 1975 career program graduates of Montgomery Community College (MCC). The survey was designed to elicit responses in three major areas: the value of an associate degree in the working world, an evaluation of job preparation given to MCC graduates, and suggestions for…

  16. Preschool Recreation Enrichment Program (PREP). Trainers Handbook. Volume III. An Aid for Providers of Recreation and Education Services.

    ERIC Educational Resources Information Center

    Littman, Karen G.

    The report presents a competency based instruction approach for training providers of preschool recreation programs for both handicapped and nonhandicapped children. Seven training modules are presented, each module listing particular learning objectives in behavioral terms, along with suggested learning activities (such as readings and…

  17. Intelligent perturbation algorithms for space scheduling optimization

    NASA Technical Reports Server (NTRS)

    Kurtzman, Clifford R.

    1990-01-01

    The optimization of space operations is examined in the light of optimization heuristics for computer algorithms and iterative search techniques. Specific attention is given to the search concepts known collectively as intelligent perturbation algorithms (IPAs) and their application to crew/resource allocation problems. IPAs iteratively examine successive schedules which become progressively more efficient, and the characteristics of good perturbation operators are listed. IPAs can be applied to aerospace systems to efficiently utilize crews, payloads, and resources in the context of systems such as Space-Station scheduling. A program is presented called the MFIVE Space Station Scheduling Worksheet which generates task assignments and resource usage structures. The IPAs can be used to develop flexible manifesting and scheduling for the Industrial Space Facility.

  18. Computerizing the Reference Desk Schedule.

    ERIC Educational Resources Information Center

    deHaas, Pat

    1983-01-01

    Discussion of the scheduling procedures of librarians' hours at the reference desk at the Rutherford Humanities and Social Sciences Library, University of Alberta, highlights services provided, the preference table system, and manual scheduling versus computer scheduling. (EJS)

  19. Gemcitabine and cisplatin in a concomitant alternating chemoradiotherapy program for locally advanced head-and-neck cancer: A pharmacology-guided schedule

    SciTech Connect

    Numico, Gianmauro . E-mail: gianmauro.numico@fastwebnet.it; Russi, Elvio G.; Vitiello, Raffele; Sorrentino, Raffaele; Colantonio, Ida; Cipolat, Marco; Taglianti, Riccardo Vigna; Pelissero, Antonio; Fea, Elena; Granetto, Cristina; Di Costanzo, Gianna; Gasco, Milena; Garrone, Ornella; Occelli, Marcella; Merlano, Marco

    2006-11-01

    Purpose: Administration of gemcitabine together with cisplatin at cytotoxic doses in a chemoradiotherapy regimen is hampered by a high degree of local toxicity. Using the pharmacologic properties of the drug we designed a modified schedule aimed at reducing toxicity while preserving activity. Methods and Materials: Patients with squamous cell carcinomas of the oral cavity, pharynx and larynx, bulky T4, and/or N2 to N3 were eligible. Gemcitabine was administered at a dose of 800 mg/m{sup 2} on Days 1 and 12 and cisplatin at a dose of 20 mg/m{sup 2} on Days 2 to 5, every 21 days for 3 courses. Radiotherapy, delivered with standard fractionation, was given on Days 8 to 12 and 15 to 19 and was repeated 3 times up to a total dose of {>=}60 Gy. Results: A total of 28 patients were selected. Grade 3 to 4 stomatitis was recorded in 25 patients (89%). Thirteen patients (46%) experienced Grade 3 to 4 neutropenia. Febrile neutropenia occurred in 8 patients (29%) and in 2 was complicated by infection and death. The overall complete response rate was 79%. At a median follow up of 71 months, 11 patients had a locoregional relapse (3-year locoregional control, 64%); 6 patients had distant metastases, among whom only 2 were without locoregional recurrence. The 3-year progression-free survival is 39% and 3-year overall survival has been 43%. Conclusion: The schedule modification did not attenuate local toxicity. Moreover, infections and especially pneumonia, were a major problem. The high activity of gemcitabine when combined with radiotherapy would most likely be better exploited in the context of modified radiation schemes.

  20. Intelligent scheduling support for the US Coast Guard

    SciTech Connect

    Darby-Dowman, K.; Lucas, C.; Mitra, G. ); Fink, R. ); Kingsley, L.; Smith, J.W. )

    1992-01-01

    This paper will discuss a joint effort by the U.S. Coast Guard Research Development Center, Idaho National Engineering Laboratory and Brunel University to provide the necessary tools to increase the human scheduler's capability to handle the scheduling process more efficiently and effectively. Automating the scheduling process required a system that could think independently of the scheduler, that is, the systems needed its own control mechanism and knowledge base. Further, automated schedule generation became a design requirement and sophisticated algorithms were formulated to solve a complex combinatorial problem. In short, the resulting design can be viewed as a hybrid knowledge-based mathematical programming application system. This document contains an overview of the integrated system, a discrete optimization model for scheduling, and schedule diagnosis and analysis.

  1. Expanding symmetric multiprocessor capability through gang scheduling

    SciTech Connect

    Jette, M.A.

    1998-03-01

    Symmetric Multiprocessor (SMP) systems normally provide both space- sharing and time-sharing to insure high system utilization and good responsiveness. However the prevailing lack of concurrent scheduling for parallel programs precludes SMP use in addressing many large-scale problems. Tightly synchronized communications are impractical and normal time-sharing reduces the benefit of cache memory. Evidence gathered at Lawrence Livermore National Laboratory (LLNL) indicates that gang scheduling can increase the capability of SMP systems and parallel program performance without adverse impact upon system utilization or responsiveness.

  2. Energy audit of three energy-conserving devices in a steel industry demonstration program. Task III. GTE high temperature recuperation

    SciTech Connect

    Holden, F.C.; Hoffman, A.O.; Lownie, H.W.

    1983-06-01

    The Office of Industrial Programs of the Department of Energy has undertaken a program to demonstrate to industry the benefits of installing various energy-conserving devices and equipment. This report presents results on one of those systems, a high-temperature ceramic recuperator designed and manufactured by Sylvania Chemical and Metallurgical Division, GTE Products Corporation of Towanda, Pennsylvania. The ceramic cross-flow recuperator unit recovers waste heat from the hot combustion gases and delivers preheated air to high-temperature burners of various manufacture. Of the 38 host site installations included in the program, sufficient operating data were obtained from 28 sites to evaluate the benefits in terms of energy and economic savings that can be achieved. Performance and cost data are analyzed and presented for those 28 installations, which covered a variety of applications, sizes, and industry types. Except for 5 sites where unusual operating or data-collection problems were encountered, the improvements in performance of the recuperated furnaces equalled or exceeded estimates; the average of the total fuel savings for these 23 sites was 44.0 percent, some portion of which resulted from furnace improvements other than recuperation. Payback times were calculated for both total costs and for recuperator-related costs, using a cumulative annual after-tax cash flow method which includes tax investment credits, estimates of general and fuel-price inflation, and maintenance costs.

  3. Effects of three anthelmintic schedules on the incidence of colic in horses.

    PubMed

    Uhlinger, C

    1990-07-01

    Four privately owned herds (25 to 49 animals per herd) were used in a five-year trial designed to evaluate the effect of anthelmintic schedules on the incidence of colic. These herds had been treated bi-monthly with non-ivermectin, non-benzimidazole drugs for two years before the trial. Prior parasitological studies showed that they had substantial pre-treatment faecal egg counts (900 to 2200 eggs per gramme), and that they were infected with benzimidazole-resistant cyathostomes. In Years 1 and 2 of the trial, all herds (A, B, C, D) were treated bi-monthly with non-ivermectin anthelmintics (Schedule I). In Years 3 to 5, Herd A received monthly non-ivermectin anthelmintics (Schedule II) and Herd C was treated with bi-monthly ivermectin (Schedule III). Herd B was treated with Schedule II in Years 3 and 4 and Schedule III in Year 5. Herd D was maintained on Schedule I throughout the study period. In each herd, the incidence of colic, while on Schedule I, was compared to the incidence while on Schedule II or III. The risk of colic for horses on Schedule I was 2.61 to 13.04 times that of the same horses while on Schedule II and 2.27 to 9.64 times that of the same horses while on Schedule III. In Herd D, treated according to Schedule I for five years, the incidence of colic did not vary significantly throughout the study period. More effective anthelmintic treatment schedules decreased the incidence of colic in these herds, supporting the conclusion that bimonthly treatment with non-ivermectin drugs may not maximise horses' health in all management conditions.(ABSTRACT TRUNCATED AT 250 WORDS)

  4. The Probability of Small Schedule Values and Preference for Random-Interval Schedules

    PubMed Central

    Soreth, Michelle Ennis; Hineline, Philip N

    2009-01-01

    Preference for working on variable schedules and temporal discrimination were simultaneously examined in two experiments using a discrete-trial, concurrent-chains arrangement with fixed interval (FI) and random interval (RI) terminal links. The random schedule was generated by first sampling a probability distribution after the programmed delay to reinforcement on the FI schedule had elapsed, and thus the RI never produced a component schedule value shorter than the FI and maintained a rate of reinforcement half that of the FI. Despite these features, the FI was not strongly preferred. The probability of obtaining the smallest programmed delay to reinforcement on the RI schedule was manipulated in Experiment 1, and the interaction of this probability and initial link length was examined in Experiment 2. As the probability of obtaining small values in the RI increased, preference for the schedule increased while the discriminated time of reinforcer availability in the terminal link decreased. Both of these effects were attenuated by lengthening the initial links. The results support the view that in addition to the delay to reinforcement, the probability of obtaining a short delay is an important choice-affecting variable that likely contributes to the robust preferences for variable, as opposed to fixed, schedules of reinforcement. PMID:19230514

  5. SARA Title III and community hazards planning: Lessons for the US Army's Chemical Stockpile Emergency Preparedness Program

    SciTech Connect

    Feldman, D.L.

    1991-01-01

    This paper provides an overview and analysis of the impact of Title 3 of the Superfund Amendments and Reauthorization Act of 1986 (SARA Title 3) on improving community participation and risk communication and facilitating decisions leading to enhanced emergency preparedness for timely response to accidental hazardous chemical releases. The US Army's Chemical Stockpile Disposal Program (CSDP) and attendant Chemical Stockpile Emergency Preparedness Program (CSEPP) are case studies. In addition to reviewing progress in SARA Title 3 implementation in the 10 states directly affected by these programs, interviews were conducted with regional Environmental Protection Agency (EPA) and Federal Emergency Management Agency (FEMA) representatives responsible for overseeing staffing and fiscal decisions that enable this law to take effect. These interviews also permit derivation of a broad federal perspective on Title 3's success (or lack thereof) in heightening public awareness of chemical hazards and improving local political competence in addressing chemical hazards warning, notification, communication, and procurement and equipment acquisition issues. We conclude that SARA Title 3 has significantly transformed the process of chemical and other technological hazards management by forcing greater cooperation between federal agencies (particularly EPA, FEMA, and, in some instances, the Occupational Health and Safety Administration, or OSHA) and states in planning and conducting emergency exercises. The process of emergency planning is becoming increasingly decentralized. However, we also conclude that Local Emergency Planning Committees (LEPCs) and State Emergency Response Commissions (SERCs)--institutions established under Title 3--are faced with several challenges in order to ensure viable risk communication and achievement of enhanced preparedness in local communities nationwide. 36 refs., 3 tabs.

  6. Prototype resupply scheduler

    NASA Technical Reports Server (NTRS)

    Tanner, Steve; Hughes, Angi; Byrd, Jim

    1987-01-01

    Resupply scheduling for the Space Station presents some formidable logistics problems. One of the most basic problems is assigning supplies to a series of shuttle resupply missions. A prototype logistics expert system which constructs resupply schedules was developed. This prototype is able to reconstruct feasible resupply plans. In addition, analysts can use the system to evaluate the impact of adding, deleting or modifying launches, cargo space, experiments, etc.

  7. C.U.B.E. Reading. Goal III. A Reading Program for Adult Basic Education. 0-6 Grade Students. Book 2 of Three Books in This Program.

    ERIC Educational Resources Information Center

    Vincennes Univ., IN.

    A part of the adult basic education teaching/learning management system called CUBE (Continuity and Unity in Basic Education), this manual is designed to help those teaching students with "splinter skills" to piece together the students' deficient skills and develop an individualized reading program. It consists of three sections. Addressed in…

  8. Generically Used Expert Scheduling System (GUESS): User's Guide Version 1.0

    NASA Technical Reports Server (NTRS)

    Liebowitz, Jay; Krishnamurthy, Vijaya; Rodens, Ira

    1996-01-01

    This user's guide contains instructions explaining how to best operate the program GUESS, a generic expert scheduling system. GUESS incorporates several important features for a generic scheduler, including automatic scheduling routines to generate a 'first' schedule for the user, a user interface that includes Gantt charts and enables the human scheduler to manipulate schedules manually, diagnostic report generators, and a variety of scheduling techniques. The current version of GUESS runs on an IBM PC or compatible in the Windows 3.1 or Windows '95 environment.

  9. Analysis of the integration of the physician rostering problem and the surgery scheduling problem.

    PubMed

    Van Huele, Christophe; Vanhoucke, Mario

    2014-06-01

    In this paper, we present the Integrated Physician and Surgery Scheduling Problem (IPSSP) as a new approach for solving operating room scheduling problems where staff rosters for the physicians are integrated in the optimization. A mixed integer linear programming formulation is created based on the most frequently observed objective and restrictions of the surgery scheduling and the physician rostering problem in the literature. We analyze schedules by relaxing both surgery and physician related constraints. We then measure the implications of setting these physician preferences on the surgery schedule. Our experiments show two main interesting insights for physician roster schedulers as well as operating theatre scheduling managers.

  10. Enhanced Software for Scheduling Space-Shuttle Processing

    NASA Technical Reports Server (NTRS)

    Barretta, Joseph A.; Johnson, Earl P.; Bierman, Rocky R.; Blanco, Juan; Boaz, Kathleen; Stotz, Lisa A.; Clark, Michael; Lebovitz, George; Lotti, Kenneth J.; Moody, James M.; Nguyen, Tony K.; Peterson, Kenneth A.; Sargent, Susan; Shaw, Karma; Stoner, Mack D.; Stowell, Deborah S.; Young, Daniel A.; Tulley, James H., Jr.

    2004-01-01

    The Ground Processing Scheduling System (GPSS) computer program is used to develop streamlined schedules for the inspection, repair, and refurbishment of space shuttles at Kennedy Space Center. A scheduling computer program is needed because space-shuttle processing is complex and it is frequently necessary to modify schedules to accommodate unanticipated events, unavailability of specialized personnel, unexpected delays, and the need to repair newly discovered defects. GPSS implements constraint-based scheduling algorithms and provides an interactive scheduling software environment. In response to inputs, GPSS can respond with schedules that are optimized in the sense that they contain minimal violations of constraints while supporting the most effective and efficient utilization of space-shuttle ground processing resources. The present version of GPSS is a product of re-engineering of a prototype version. While the prototype version proved to be valuable and versatile as a scheduling software tool during the first five years, it was characterized by design and algorithmic deficiencies that affected schedule revisions, query capability, task movement, report capability, and overall interface complexity. In addition, the lack of documentation gave rise to difficulties in maintenance and limited both enhanceability and portability. The goal of the GPSS re-engineering project was to upgrade the prototype into a flexible system that supports multiple- flow, multiple-site scheduling and that retains the strengths of the prototype while incorporating improvements in maintainability, enhanceability, and portability.

  11. A MIP Model for Rolling Horizon Surgery Scheduling.

    PubMed

    Luo, Li; Luo, Yong; You, Yang; Cheng, Yuanjun; Shi, Yingkang; Gong, Renrong

    2016-05-01

    Most surgery scheduling is done 1 day in advance. Caused by lack of overall planning, this scheduling scheme often results in unbalanced occupancy time of the operating rooms. So we put forward a rolling horizon mixed integer programming model for the scheduling. Rolling horizon scheduling refers to a scheduling scheme in which cyclic surgical requests are taken into account. Surgical requests are updated daily. The completed surgeries are eliminated, and new surgeries are added to the scheduling list. Considering day-to-day demand for surgery, we develop a non-rolling scheduling model (NRSM) and a rolling horizon scheduling model (RSM). By comparing the two, we find that the quality of surgery scheduling is significantly influenced by the variation in demand from day to day. A rolling horizon scheduling will enable a more flexible planning of the pool of surgeries that have not been scheduled into this main blocks, and hence minimize the idle time of operating rooms. The strategy of the RSM helps balance the occupancy time among operating rooms. Using surgical data from five departments of the West China Hospital (WCH), we generate surgical demands randomly to compare the NRSM and the RSM. The results show the operating rooms' average utilization rate using RSM is significantly higher than when applying NRSM.

  12. Expert system for scheduling simulation lab sessions

    NASA Technical Reports Server (NTRS)

    Lund, Chet

    1990-01-01

    Implementation and results of an expert system used for scheduling session requests for the Systems Engineering Simulator (SES) laboratory at the NASA Johnson Space Center (JSC) are discussed. Weekly session requests are received from astronaut crew trainers, procedures developers, engineering assessment personnel, software developers, and various others who wish to access the computers, scene generators, and other simulation equipment available to them in the SES lab. The expert system under discussion is comprised of a data acquisition portion - two Pascal programs run on a personal computer - and a CLIPS program installed on a minicomputer. A brief introduction to the SES lab and its scheduling background is given. A general overview of the system is provided, followed by a detailed description of the constraint-reduction process and of the scheduler itself. Results from a ten-week trial period using this approach are discussed. Finally, a summary of the expert system's strengths and shortcomings are provided.

  13. The Effectiveness of Performance Incentives under Continuous and Variable Ration Schedules of Reinforcement

    ERIC Educational Resources Information Center

    Yukl, Gary A.; And Others

    1976-01-01

    Results of this study indicate that sample group of unskilled laborers were more productive working under a schedule of continuous reinforcement than under a varied schedule, despite higher average earnings during the latter program. (RW)

  14. An optimal spacecraft scheduling model for the NASA deep space network

    NASA Technical Reports Server (NTRS)

    Webb, W. A.

    1985-01-01

    A computer model is described which uses mixed-integer linear programming to provide optimal DSN spacecraft schedules given a mission set and specified scheduling requirements. A solution technique is proposed which uses Bender's method and a heuristic starting algorithm.

  15. Federal Facility Agreement plans and schedules for liquid low-level radioactive waste tank systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect

    Not Available

    1992-03-01

    Although the Federal Facility Agreement (FFA) addresses the entire Oak Ridge Reservation, specific requirements are set forth for the liquid low-level radioactive waste (LLLW) storage tanks and their associated piping and equipment, tank systems, at ORNL. The stated objected of the FFA as it relates to these tank systems is to ensure that structural integrity, containment and detection of releases, and source control are maintained pending final remedial action at the site. The FFA requires that leaking LLLW tank systems be immediately removed from service. It also requires the LLLW tank systems that do not meet the design and performance requirements established for secondary containment and leak detection be either upgraded or replaced. The FFA establishes a procedural framework for implementing the environmental laws. For the LLLW tank systems, this framework requires the specified plans and schedules be submitted to EPA and TDEC for approval within 60 days, or in some cases, within 90 days, of the effective date of the agreement.

  16. Space-reactor system and subsystem investigations: cost and schedule estimates for reactor and shield subsystems technology development. SP-100 Program

    SciTech Connect

    Determan, W.R.; Harty, R.B.; Hylin, C.

    1983-06-30

    This report presents cost and schedule estimates of the technology development for reactor and shielding subsystems of a 100-kWe class space reactor electric system. The subsystems technology development (which includes reactor and shield subsystems ground testing) is supported by materials and processes development and component development. For the purpose of the cost estimate, seven generic types of reactor subsystems were used: uranium-zirconium hydride, NaK-cooled thermal reactor; lithium-cooled, refractory-clad fast reactor; Na- or K-cooled fast reactor; in-core thermionic reactor; inert gas-cooled particle fuel reactor; inert gas-cooled metal-clad fast reactor; and heat pipe-cooled fast reactor. Also three levels of technology were included for each of the generic types of reactor subsystem: current, improved, and advanced. The data in this report encompass all these technology levels. The shielding subsystem uses both gamma (heavy-metal) and neutron (hydrogenous material) shields. The shields considered in this report would be used in conjunction with unmanned payloads.

  17. Collegiate Athletics: An Investigation into Athletic Persistence of Freshman Student-Athletes Participating in NCAA Division-III Varsity Athletic Programs

    ERIC Educational Resources Information Center

    Sombito, Lester Jamili

    2015-01-01

    Understanding of the persistence of student-athletes in athletics at the D-III level is complex. This research study investigated the issue of student-athlete retention by focusing on Division III (D-III) student-athlete persistence in athletics by asking the following research question, "To what extent do freshman student-athletes persist in…

  18. Polynomial optimization techniques for activity scheduling. Optimization based prototype scheduler

    NASA Technical Reports Server (NTRS)

    Reddy, Surender

    1991-01-01

    Polynomial optimization techniques for activity scheduling (optimization based prototype scheduler) are presented in the form of the viewgraphs. The following subject areas are covered: agenda; need and viability of polynomial time techniques for SNC (Space Network Control); an intrinsic characteristic of SN scheduling problem; expected characteristics of the schedule; optimization based scheduling approach; single resource algorithms; decomposition of multiple resource problems; prototype capabilities, characteristics, and test results; computational characteristics; some features of prototyped algorithms; and some related GSFC references.

  19. Chandra mission scheduling on-orbit experience

    NASA Astrophysics Data System (ADS)

    Bucher, Sabina; Williams, Brent; Pendexter, Misty; Balke, David

    2008-07-01

    Scheduling observatory time to maximize both day-to-day science target integration time and the lifetime of the observatory is a formidable challenge. Furthermore, it is not a static problem. Of course, every schedule brings a new set of observations, but the boundaries of the problem change as well. As spacecraft ages, its capabilities may degrade. As in-flight experience grows, capabilities may expand. As observing programs are completed, the needs and expectations of the science community may evolve. Changes such as these impact the rules by which a mission scheduled. In eight years on orbit, the Chandra X-Ray Observatory Mission Planning process has adapted to meet the challenge of maximizing day-to-day and mission lifetime science return, despite a consistently evolving set of scheduling constraints. The success of the planning team has been achieved, not through the use of complex algorithms and optimization routines, but through processes and home grown tools that help individuals make smart short term and long term Mission Planning decisions. This paper walks through the processes and tools used to plan and produce mission schedules for the Chandra X-Ray Observatory. Nominal planning and scheduling, target of opportunity response, and recovery from on-board autonomous safing actions are all addressed. Evolution of tools and processes, best practices, and lessons learned are highlighted along the way.

  20. Scheduling periodic jobs using imprecise results

    NASA Technical Reports Server (NTRS)

    Chung, Jen-Yao; Liu, Jane W. S.; Lin, Kwei-Jay

    1987-01-01

    One approach to avoid timing faults in hard, real-time systems is to make available intermediate, imprecise results produced by real-time processes. When a result of the desired quality cannot be produced in time, an imprecise result of acceptable quality produced before the deadline can be used. The problem of scheduling periodic jobs to meet deadlines on a system that provides the necessary programming language primitives and run-time support for processes to return imprecise results is discussed. Since the scheduler may choose to terminate a task before it is completed, causing it to produce an acceptable but imprecise result, the amount of processor time assigned to any task in a valid schedule can be less than the amount of time required to complete the task. A meaningful formulation of the scheduling problem must take into account the overall quality of the results. Depending on the different types of undesirable effects caused by errors, jobs are classified as type N or type C. For type N jobs, the effects of errors in results produced in different periods are not cumulative. A reasonable performance measure is the average error over all jobs. Three heuristic algorithms that lead to feasible schedules with small average errors are described. For type C jobs, the undesirable effects of errors produced in different periods are cumulative. Schedulability criteria of type C jobs are discussed.

  1. Interactive Dynamic Mission Scheduling for ASCA

    NASA Astrophysics Data System (ADS)

    Antunes, A.; Nagase, F.; Isobe, T.

    The Japanese X-ray astronomy satellite ASCA (Advanced Satellite for Cosmology and Astrophysics) mission requires scheduling for each 6-month observation phase, further broken down into weekly schedules at a few minutes resolution. Two tools, SPIKE and NEEDLE, written in Lisp and C, use artificial intelligence (AI) techniques combined with a graphic user interface for fast creation and alteration of mission schedules. These programs consider viewing and satellite attitude constraints as well as observer-requested criteria and present an optimized set of solutions for review by the planner. Six-month schedules at 1 day resolution are created for an oversubscribed set of targets by the SPIKE software, originally written for HST and presently being adapted for EUVE, XTE and AXAF. The NEEDLE code creates weekly schedules at 1 min resolution using in-house orbital routines and creates output for processing by the command generation software. Schedule creation on both the long- and short-term scale is rapid, less than 1 day for long-term, and one hour for short-term.

  2. Using dBase III.

    ERIC Educational Resources Information Center

    Evans, Janet; And Others

    1986-01-01

    Four articles on dBASE III include three on library applications: a photocopy invoicing system for interlibrary loan, a vertical file subject headings list program, and a subject index to statistical resources. Another article explains the differences between interpreters and compilers and the advantages of the Clipper compiler for dBASE III. (EM)

  3. Dosing schedules for pneumococcal conjugate vaccine: considerations for policy makers.

    PubMed

    Whitney, Cynthia G; Goldblatt, David; O'Brien, Katherine L

    2014-01-01

    Since second generation pneumococcal conjugate vaccines (PCVs) targeting 10 and 13 serotypes became available in 2010, the number of national policy makers considering these vaccines has steadily increased. An important consideration for a national immunization program is the timing and number of doses-the schedule-that will best prevent disease in the population. Data on disease epidemiology and the efficacy or effectiveness of PCV schedules are typically considered when choosing a schedule. Practical concerns, such as the existing vaccine schedule, and vaccine program performance are also important. In low-income countries, pneumococcal disease and deaths typically peak well before the end of the first year of life, making a schedule that provides PCV doses early in life (eg, a 6-, 10- and 14-week schedule) potentially the best option. In other settings, a schedule including a booster dose may address disease that peaks in the second year of life or may be seen to enhance a schedule already in place. A large and growing body of evidence from immunogenicity studies, as well as clinical trials and observational studies of carriage, pneumonia and invasive disease, has been systematically reviewed; these data indicate that schedules of 3 or 4 doses all work well, and that the differences between these regimens are subtle, especially in a mature program in which coverage is high and indirect (herd) effects help enhance protection provided directly by a vaccine schedule. The recent World Health Organization policy statement on PCVs endorsed a schedule of 3 primary doses without a booster or, as a new alternative, 2 primary doses with a booster dose. While 1 schedule may be preferred in a particular setting based on local epidemiology or practical considerations, achieving high coverage with 3 doses is likely more important than the specific timing of doses.

  4. 48 CFR 2908.404 - Using schedules.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Using schedules. 2908.404 Section 2908.404 Federal Acquisition Regulations System DEPARTMENT OF LABOR ACQUISITION PLANNING REQUIRED... subcontracting goals to the DOL Office of Small Business Programs)....

  5. 45 CFR 1801.52 - Payment schedule.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Welfare Regulations Relating to Public Welfare (Continued) HARRY S. TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Payment Conditions and Procedures § 1801.52 Payment schedule. The Foundation will pay the Scholar a portion of the award of the Scholarship stipend (as described in the...

  6. 45 CFR 1801.52 - Payment schedule.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Welfare Regulations Relating to Public Welfare (Continued) HARRY S. TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Payment Conditions and Procedures § 1801.52 Payment schedule. The Foundation will pay the Scholar a portion of the award of the Scholarship stipend (as described in the...

  7. 45 CFR 1801.52 - Payment schedule.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Welfare Regulations Relating to Public Welfare (Continued) HARRY S. TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Payment Conditions and Procedures § 1801.52 Payment schedule. The Foundation will pay the Scholar a portion of the award of the Scholarship stipend (as described in the...

  8. 45 CFR 1801.52 - Payment schedule.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Welfare Regulations Relating to Public Welfare (Continued) HARRY S. TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Payment Conditions and Procedures § 1801.52 Payment schedule. The Foundation will pay the Scholar a portion of the award of the Scholarship stipend (as described in the...

  9. 45 CFR 1801.52 - Payment schedule.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Welfare Regulations Relating to Public Welfare (Continued) HARRY S. TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Payment Conditions and Procedures § 1801.52 Payment schedule. The Foundation will pay the Scholar a portion of the award of the Scholarship stipend (as described in the...

  10. Scheduling with Automatic Resolution of Conflicts

    NASA Technical Reports Server (NTRS)

    Clement, Bradley; Schaffer, Steve

    2006-01-01

    DSN Requirement Scheduler is a computer program that automatically schedules, reschedules, and resolves conflicts for allocations of resources of NASA s Deep Space Network (DSN) on the basis of ever-changing project requirements for DSN services. As used here, resources signifies, primarily, DSN antennas, ancillary equipment, and times during which they are available. Examples of project-required DSN services include arraying, segmentation, very-long-baseline interferometry, and multiple spacecraft per aperture. Requirements can include periodic reservations of specific or optional resources during specific time intervals or within ranges specified in terms of starting times and durations. This program is built on the Automated Scheduling and Planning Environment (ASPEN) software system (aspects of which have been described in previous NASA Tech Briefs articles), with customization to reflect requirements and constraints involved in allocation of DSN resources. Unlike prior DSN-resource- scheduling programs that make single passes through the requirements and require human intervention to resolve conflicts, this program makes repeated passes in a continuing search for all possible allocations, provides a best-effort solution at any time, and presents alternative solutions among which users can choose.

  11. 29 CFR 1952.311 - Developmental schedule.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 9 2011-07-01 2011-07-01 false Developmental schedule. 1952.311 Section 1952.311 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR.... (d) Complete implementation of the occupational health program by July 1975. (e) Complete State...

  12. Schedule and status of irradiation experiments

    SciTech Connect

    Rowcliffe, A.F.; Grossbeck, M.L.; Robertson, J.P.

    1998-03-01

    The current status of reactor irradiation experiments is presented in tables summarizing the experimental objectives, conditions, and schedule. Currently, the program has four irradiation experiments in reactor, and five experiments in the design or construction stages. Postirradiation examination and testing is in progress on ten experiments.

  13. 40 CFR 63.1291 - Compliance schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Compliance schedule. 63.1291 Section 63.1291 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES National Emission Standards for Hazardous Air Pollutants for...

  14. 42 CFR 457.525 - Public schedule.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Public schedule. 457.525 Section 457.525 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STATE CHILDREN'S HEALTH INSURANCE PROGRAMS (SCHIPs) ALLOTMENTS AND GRANTS TO STATES State...

  15. 42 CFR 457.525 - Public schedule.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 4 2014-10-01 2014-10-01 false Public schedule. 457.525 Section 457.525 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) STATE CHILDREN'S HEALTH INSURANCE PROGRAMS (SCHIPs) ALLOTMENTS AND GRANTS TO STATES State...

  16. 40 CFR 52.1482 - Compliance schedules.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 4 2013-07-01 2013-07-01 false Compliance schedules. 52.1482 Section 52.1482 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... adoption Jack N. Tedford, Inc Fallon Not given Aug. 14, 1972. Basic, Inc Gabbs Article 4 Feb. 13,...

  17. Schedule and status of irradiation experiments

    SciTech Connect

    Rowcliffe, A.F.; Grossbeck, M.L.; Robertson, J.P.

    1998-09-01

    The current status of reactor irradiation experiments is presented in tables summarizing the experimental objectives, conditions, and schedule. Currently, the program has one irradiation experiment in reactor and five experiments in the design or construction stages. Postirradiation examination and testing is in progress on ten experiments.

  18. 40 CFR 52.626 - Compliance schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Subpart N of this chapter. The regulations cited are air pollution control regulations of the State....626 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.626 Compliance schedules. (a) (b)...

  19. 40 CFR 52.1335 - Compliance schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Compliance schedules. 52.1335 Section 52.1335 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED... Effective date Final compliance date Pilot Knob Pelleting Co Pilot Knob, MO V(10 CSR 10-3.050) Oct. 19,...

  20. 40 CFR 63.1401 - Compliance schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 11 2010-07-01 2010-07-01 true Compliance schedule. 63.1401 Section 63.1401 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES National Emission...

  1. 7 CFR 283.29 - Scheduling conference.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 4 2013-01-01 2013-01-01 false Scheduling conference. 283.29 Section 283.29 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM APPEALS OF QUALITY CONTROL (âQCâ) CLAIMS...

  2. 7 CFR 283.29 - Scheduling conference.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 4 2014-01-01 2014-01-01 false Scheduling conference. 283.29 Section 283.29 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM APPEALS OF QUALITY CONTROL (âQCâ) CLAIMS Summary Procedure for Appeals of QC Claims of...

  3. 7 CFR 283.29 - Scheduling conference.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 4 2012-01-01 2012-01-01 false Scheduling conference. 283.29 Section 283.29 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM APPEALS OF QUALITY CONTROL (âQCâ) CLAIMS...

  4. 7 CFR 283.29 - Scheduling conference.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 4 2011-01-01 2011-01-01 false Scheduling conference. 283.29 Section 283.29 Agriculture Regulations of the Department of Agriculture (Continued) FOOD AND NUTRITION SERVICE, DEPARTMENT OF AGRICULTURE FOOD STAMP AND FOOD DISTRIBUTION PROGRAM APPEALS OF QUALITY CONTROL (âQCâ) CLAIMS...

  5. 20 CFR 638.505 - Scheduling of training.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Scheduling of training. 638.505 Section 638.505 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR JOB CORPS PROGRAM UNDER TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Center Operations § 638.505 Scheduling of...

  6. 10 CFR 490.302 - Vehicle acquisition mandate schedule.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Vehicle acquisition mandate schedule. 490.302 Section 490.302 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fuel Provider Vehicle Acquisition Mandate § 490.302 Vehicle acquisition mandate schedule....

  7. 10 CFR 490.302 - Vehicle acquisition mandate schedule.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 3 2014-01-01 2014-01-01 false Vehicle acquisition mandate schedule. 490.302 Section 490.302 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fuel Provider Vehicle Acquisition Mandate § 490.302 Vehicle acquisition mandate schedule....

  8. 10 CFR 490.302 - Vehicle acquisition mandate schedule.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 3 2013-01-01 2013-01-01 false Vehicle acquisition mandate schedule. 490.302 Section 490.302 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fuel Provider Vehicle Acquisition Mandate § 490.302 Vehicle acquisition mandate schedule....

  9. 10 CFR 490.302 - Vehicle acquisition mandate schedule.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Vehicle acquisition mandate schedule. 490.302 Section 490.302 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fuel Provider Vehicle Acquisition Mandate § 490.302 Vehicle acquisition mandate schedule....

  10. 10 CFR 490.302 - Vehicle acquisition mandate schedule.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 3 2012-01-01 2012-01-01 false Vehicle acquisition mandate schedule. 490.302 Section 490.302 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fuel Provider Vehicle Acquisition Mandate § 490.302 Vehicle acquisition mandate schedule....

  11. 20 CFR 638.505 - Scheduling of training.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Scheduling of training. 638.505 Section 638.505 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR JOB CORPS PROGRAM UNDER TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Center Operations § 638.505 Scheduling of...

  12. 34 CFR 535.52 - What is the repayment schedule?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 3 2011-07-01 2011-07-01 false What is the repayment schedule? 535.52 Section 535.52 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF BILINGUAL... PROGRAM What Conditions Must Be Met by Fellows? § 535.52 What is the repayment schedule? (a) A...

  13. Automated Scheduling Via Artificial Intelligence

    NASA Technical Reports Server (NTRS)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  14. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1991-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocations for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its applications to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  15. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1991-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  16. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  17. Application of Linear Programming Models To Determine Optimum School Attendance Areas and Busing Schedules, Subject to Varying Racial Composition. Final Report.

    ERIC Educational Resources Information Center

    Pogany, Peter P.

    The study applied the conventional linear transportation program to the student assignment problem and investigated methods of measuring the achieved level of desegregation. Existing measures of desegregation were analyzed, and two new indexes were developed for use in the present model and probably for other system analytical models designed to…

  18. "Options in Education." Transcript for Program Scheduled for Broadcast the Week of August 2, 1976: Schooling and Jobs--Part I.

    ERIC Educational Resources Information Center

    George Washington Univ., Washington, DC. Inst. for Educational Leadership.

    Underemployment is the focus of this transcript of a radio series published as an electronic weekly magazine concerned with issues in education. The first of a 2-part series, this program incorporates studio interviews with: James O'Toole of the Center for the Study of the Future; a ceramics college graduate working as a shipping clerk; various…

  19. The centralized prenatal genetics screening program of New York City III: The first 7,000 cases.

    PubMed

    Benn, P A; Hsu, L Y; Carlson, A; Tannenbaum, H L

    1985-02-01

    The Prenatal Diagnosis Laboratory of New York City (PDL) is a regional program for the prevention of genetic diseases. The administrative aspects of the establishment of the laboratory were described in papers I [Hsu, 1981] and II [Hsu and Benn, 1981] in this series. We now report our experience of the first 7,000 referrals to the laboratory. The laboratory achieved a success rate of 99.5% in obtaining a diagnosis. The frequency with which a repeat amniocentesis was required was 1.9%, usually attributable to inadequate initial amniotic fluid volume or condition. Cases were completed in an average time of 20.82 days. A total of 149 (2.13%) cytogenetic abnormalities were detected. There were 59 nonmosaic autosomal trisomies and 29 sex chromosome abnormalities. The incidence of unbalanced structural abnormalities (0.186%) was much higher than that reported in surveys of newborn infants largely because of the prenatal detection of cases with supernumerary chromosomes. The incidence of balanced structural abnormalities was also considerably higher than that found in surveys of the newborn population, in part because of the detection of subtle familial pericentric inversions of common chromosome regions (inv(Y)(p11q11), inv(2) (p11q13), and inv(1)(p11q13)). The incidence of cases with multiple independent chromosome abnormalities was no higher than expected by chance. A high incidence of mosaicism, pseudomosaicism, and maternal cell contamination was found. Screening for neural tube defects accounted for the detection of a further 16 abnormalities. Nearly all women with severely abnormal fetuses (trisomy 13, 18, 21) elected to terminate their pregnancy whereas only 62% of patients with a prenatally diagnosed sex chromosome abnormality elected to terminate their pregnancies. Full details of follow-up and confirmatory studies for unusual diagnoses are reported. Utilization of prenatal diagnosis in the New York City area has increased sharply since PDL became operational

  20. Berkeley Supernova Ia Program - III. Spectra near maximum brightness improve the accuracy of derived distances to Type Ia supernovae

    NASA Astrophysics Data System (ADS)

    Silverman, Jeffrey M.; Ganeshalingam, Mohan; Li, Weidong; Filippenko, Alexei V.

    2012-09-01

    In this third paper in a series we compare spectral feature measurements to photometric properties of 108 low-redshift (z < 0.1, ≈ 0.023) Type Ia supernovae (SNe Ia) for which we have optical spectra within 5 d of maximum brightness. The spectral data were obtained from 1989 to the end of 2008 as part of the Berkeley Supernova Ia Program (BSNIP) and are presented in BSNIP I by Silverman et al., and the photometric data come mainly from the Lick Observatory Supernova Search and are published by Ganeshalingam et al. The spectral measurements are presented and discussed in BSNIP II by Silverman, Kong & Filippenko, and the light-curve fits and photometric parameters can be found in Ganeshalingam et al. (in preparation). A variety of previously proposed correlations between spectral and photometric parameters are investigated using the large and self-consistent BSNIP data set. We find the pseudo-equivalent width (pEW) of the Si II λ4000 line to be a good indicator of light-curve width, and the pEWs of the Mg II and Fe II complexes are relatively good proxies for SN colour. We also employ a combination of light-curve parameters (specifically the Spectral Adaptive Light-curve Template 2 stretch and colour parameters x1 and c, respectively) and spectral measurements to calculate distance moduli. The residuals from these models are then compared to the standard model which uses only light-curve stretch and colour. Our investigations show that a distance model that uses x1, c and the velocity of the Si II λ6355 feature does not lead to a decrease in the Hubble residuals. We also find that distance models with flux ratios alone or in conjunction with light-curve information rarely perform better than the standard (x1, c) model. However, when adopting a distance model which combines the ratio of fluxes near ˜3750 and 4550 Å with both x1 and c, the Hubble residuals are decreased by ˜10 per cent, which is found to be significant at about the 2σ level. The weighted

  1. The Responsive Classroom Observation Schedule--Background and Development.

    ERIC Educational Resources Information Center

    Rayder, Nicholas F.; And Others

    This report focuses on the development and implementation of a 1-day classroom observation schedule designed to evaluate the Responsive Education Program, a compensatory program of formal education for children, ages 3-9, and their families. The program is an effort to create Head Start and Follow Through programs for children who are ethnically…

  2. Scheduling Operations for Massive Heterogeneous Clusters

    NASA Technical Reports Server (NTRS)

    Humphrey, John; Spagnoli, Kyle

    2013-01-01

    High-performance computing (HPC) programming has become increasingly difficult with the advent of hybrid supercomputers consisting of multicore CPUs and accelerator boards such as the GPU. Manual tuning of software to achieve high performance on this type of machine has been performed by programmers. This is needlessly difficult and prone to being invalidated by new hardware, new software, or changes in the underlying code. A system was developed for task-based representation of programs, which when coupled with a scheduler and runtime system, allows for many benefits, including higher performance and utilization of computational resources, easier programming and porting, and adaptations of code during runtime. The system consists of a method of representing computer algorithms as a series of data-dependent tasks. The series forms a graph, which can be scheduled for execution on many nodes of a supercomputer efficiently by a computer algorithm. The schedule is executed by a dispatch component, which is tailored to understand all of the hardware types that may be available within the system. The scheduler is informed by a cluster mapping tool, which generates a topology of available resources and their strengths and communication costs. Software is decoupled from its hardware, which aids in porting to future architectures. A computer algorithm schedules all operations, which for systems of high complexity (i.e., most NASA codes), cannot be performed optimally by a human. The system aids in reducing repetitive code, such as communication code, and aids in the reduction of redundant code across projects. It adds new features to code automatically, such as recovering from a lost node or the ability to modify the code while running. In this project, the innovators at the time of this reporting intend to develop two distinct technologies that build upon each other and both of which serve as building blocks for more efficient HPC usage. First is the scheduling and dynamic

  3. Scheduling with genetic algorithms

    NASA Technical Reports Server (NTRS)

    Fennel, Theron R.; Underbrink, A. J., Jr.; Williams, George P. W., Jr.

    1994-01-01

    In many domains, scheduling a sequence of jobs is an important function contributing to the overall efficiency of the operation. At Boeing, we develop schedules for many different domains, including assembly of military and commercial aircraft, weapons systems, and space vehicles. Boeing is under contract to develop scheduling systems for the Space Station Payload Planning System (PPS) and Payload Operations and Integration Center (POIC). These applications require that we respect certain sequencing restrictions among the jobs to be scheduled while at the same time assigning resources to the jobs. We call this general problem scheduling and resource allocation. Genetic algorithms (GA's) offer a search method that uses a population of solutions and benefits from intrinsic parallelism to search the problem space rapidly, producing near-optimal solutions. Good intermediate solutions are probabalistically recombined to produce better offspring (based upon some application specific measure of solution fitness, e.g., minimum flowtime, or schedule completeness). Also, at any point in the search, any intermediate solution can be accepted as a final solution; allowing the search to proceed longer usually produces a better solution while terminating the search at virtually any time may yield an acceptable solution. Many processes are constrained by restrictions of sequence among the individual jobs. For a specific job, other jobs must be completed beforehand. While there are obviously many other constraints on processes, it is these on which we focussed for this research: how to allocate crews to jobs while satisfying job precedence requirements and personnel, and tooling and fixture (or, more generally, resource) requirements.

  4. Cost and schedule analytical techniques development

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This contract provided technical services and products to the Marshall Space Flight Center's Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02) for the period of 3 Aug. 1991 - 30 Nov. 1994. Accomplishments summarized cover the REDSTAR data base, NASCOM hard copy data base, NASCOM automated data base, NASCOM cost model, complexity generators, program planning, schedules, NASA computer connectivity, other analytical techniques, and special project support.

  5. [Clinical aspects of acquired antithrombin III deficiency].

    PubMed

    von Blohn, G; Hellstern, P; Köhler, M; Scheffler, P; Wenzel, E

    1986-02-01

    The significance of acquired antithrombin III (AT III) deficiency must be interpreted in close relation to the underlying disease process. In patients with acute or chronic liver impairment, the AT III activity is related to a decrease of procoagulatory factors, whereas, in protein loss syndromes such as nephrotic syndrome, the AT III indicates an increased risk of thromboembolic events. The effect of oral contraceptives (OC) on AT III levels in young healthy females (n = 30) was determined prospectively. AT III decreases during OC usage could not be related to the estrogen content of the examined oral contraceptives, and there was no parallel decrease of AT III activity and concentration in each type of OC. In a prospective study, the extent of AT III decrease was determined in patients undergoing cardiopulmonary bypass operations (CPB) receiving different anticoagulant schedules during extracorporeal circulation (n = 49). There was no significant influence on the effectiveness of anticoagulation by the observed AT III decreases. AT III deficiency during CPB was primarily the result of hemodilution. However, the AT III kinetics were significantly influenced by the different protamin dosages and were not affected by the different heparin dosages. Correction of diminished AT III levels by substitution of AT III concentrates is beneficial in cases, in which an interruption of an enhanced coagulatory process such as disseminated intravascular coagulation is necessary or in patients requiring high dosage heparinization as in deep vein thrombosis. In those cases the quality of AT III correction correlates to the course of the disease. However, the potency of concentrates as well as the individual AT III recovery and half-life must be considered for an appropriate treatment with AT III substitution. PMID:3718407

  6. Integrated planning and scheduling for Earth science data processing

    NASA Technical Reports Server (NTRS)

    Boddy, Mark; White, Jim; Goldman, Robert; Short, Nick, Jr.

    1995-01-01

    Several current NASA programs such as the EOSDIS Core System (ECS) have data processing and data management requirements that call for an integrated planning and scheduling capability. In this paper, we describe the experience of applying advanced scheduling technology operationally, in terms of what was accomplished, lessons learned, and what remains to be done in order to achieve similar successes in ECS and other programs. We discuss the importance and benefits of advanced scheduling tools, and our progress toward realizing them, through examples and illustrations based on ECS requirements. The first part of the paper focuses on the Data Archive and Distribution (DADS) V0 Scheduler. We then discuss system integration issues ranging from communication with the scheduler to the monitoring of system events and re-scheduling in response to them. The challenge of adapting the scheduler to domain-specific features and scheduling policies is also considered. Extrapolation to the ECS domain raises issues of integrating scheduling with a product-generation planner (such as PlaSTiC), and implementing conditional planning in an operational system. We conclude by briefly noting ongoing technology development and deployment projects being undertaken by HTC and the ISTB.

  7. Intelligent retail logistics scheduling

    SciTech Connect

    Rowe, J.; Jewers, K.; Codd, A.; Alcock, A.

    1996-12-31

    The Supply Chain Integrated Ordering Network (SCION) Depot Bookings system automates the planning and scheduling of perishable and non-perishable commodities and the vehicles that carry them into J. Sainsbury depots. This is a strategic initiative, enabling the business to make the key move from weekly to daily ordering. The system is mission critical, managing the inwards flow of commodities from suppliers into J. Sainsbury`s depots. The system leverages Al techniques to provide a business solution that meets challenging functional and performance needs. The SCION Depot Bookings system is operational providing schedules for 22 depots across the UK.

  8. Multi-Telescope Observing: the LCOGT Network Scheduler

    NASA Astrophysics Data System (ADS)

    Saunders, E.; Lampoudi, S.

    Las Cumbres Observatory Global Telescope (LCOGT) is developing a worldwide network of fully robotic optical telescopes dedicated to time-domain astronomy. Observatory automation, longitudinal spacing of the sites, and a centralised network scheduler enable a range of observing modes impossible with traditional manual observing from a single location. These include continuous coverage of targets across sites, simultaneous observing with multiple resources, and cadenced time-series monitoring without diurnal gaps. The network also provides resource redundancy, with the potential for observations to be rescheduled in response to changing weather conditions. The scheduling model supports a wide variety of observing programs, which typically have very different constraints, goals, contingencies and timescales. Heterogeneous requests in a networked observing environment present specific, unusual challenges for telescope scheduling that do not arise with single-resource schedulers. Here, we discuss the design of the LCOGT network scheduler. We outline the scheduler's modular architecture, describe the implementation of its components, and highlight its current and planned capabilities.

  9. Federal employees health benefits program modification of eligibility to certain employees on temporary appointments and certain employees on seasonal and intermittent schedules. Final rule.

    PubMed

    2014-10-17

    The United States Office of Personnel Management (OPM) is issuing a final rule to modify eligibility for enrollment under the Federal Employees Health Benefits (FEHB) Program to certain temporary, seasonal, and intermittent employees who are identified as full-time employees. This final rule follows a notice of proposed rulemaking published July 29, 2014. This regulation will allow newly eligible Federal employees to enroll no later than January 2015.

  10. Welding III.

    ERIC Educational Resources Information Center

    Allegheny County Community Coll., Pittsburgh, PA.

    Instructional objectives and performance requirements are outlined in this course guide for Welding III, an advanced course in arc welding offered at the Community College of Allegheny County to provide students with the proficiency necessary for industrial certification. The course objectives, which are outlined first, specify that students will…

  11. A program system for ab initio MO calculations on vector and parallel processing machines III. Integral reordering and four-index transformation

    NASA Astrophysics Data System (ADS)

    Wiest, Roland; Demuynck, Jean; Bénard, Marc; Rohmer, Marie-Madeleine; Ernenwein, René

    1991-01-01

    This series of three papers presents a program system for ab initio molecular orbital calculations on vector and parallel computers. Part III is devoted to the four-index transformation on a molecular orbital basis of size NMO of the file of two-electron integrals ( pq∥ rs) generated by a contracted Gaussian set of size NATO (number of atomic orbitals). A fast Yoshimine algorithm first sorts the ( pq∥ rs) integrals with respect to index pq only. This file of half-sorted integrals labelled by their rs-index can be processed without further modification to generate either the transformed integrals or the supermatrix elements. The large memory available on the CRAY-2 has made possible to implement the transformation algorithm proposed by Bender in 1972, which requires a core-storage allocation varying as (NATO) 3. Two versions of Bender's algorithm are included in the present program. The first version is an in-core version, where the complete file of accumulated contributions to transformed integrals is stored and updated in central memory. This version has been parallelized by distributing over a limited number of logical tasks the NATO steps corresponding to the scanning of the most external loop. The second version is an out-of-core version, in which twin fires are alternatively used as input and output for the accumulated contributions to transformed integrals. This version is not parallel. The choice of one or another version and (for version 1) the determination of the number of tasks depends upon the balance between the available and the requested amounts of storage. The storage management and the choice of the proper version are carried out automatically using dynamic storage allocation. Both versions are vectorized and take advantage of the molecular symmetry.

  12. Routine environmental monitoring schedule, calendar year 1998

    SciTech Connect

    McKinney, S.M.

    1997-11-24

    This document provides the Environmental Restorations Contractor (ERC) and the Project Hanford Management Contractor (PHMC) a schedule in accordance with the HNF-PRO-454, Inactive Waste Sites` HNF-PRO-455, Solid Waste 3 Management4 and BHI-EE-02, Environmental Requirements, of monitoring and sampling, routines for the near-facility environmental monitoring program during calendar year (CY) 1998. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Environmental Monitoring and Investigations. The survey frequencies for particular sites are determined by the technical judgment of Environmental Monitoring and investigations and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1999. The outside perimeter road surveys of 200 East and West Area and the rail survey from the 300 Area to Columbia Center will be performed in the year 2000 per agreement with Department of Energy, Richland Field Office. This schedule does not discuss staffing needs, nor does it list the monitoring equipment to be used in completing specific routines. Personnel performing routines to meet this schedule shall communicate any need for 1332 assistance in completing these routines to Radiological Control management and Environmental Monitoring and Investigations. After each routine survey is completed, a copy of the survey record, maps, and data sheets will be forwarded to Environmental Monitoring and Investigations. These routine surveys will not be considered complete until this

  13. Parent Interview Schedule.

    ERIC Educational Resources Information Center

    Purdue Univ., Lafayette, IN. Educational Research Center.

    This 116-item interview schedule designed for parents who failed to respond to the Questionnaire for Parents, is individually administered to the mother of the child of elementary school age. It consists of scales measuring 14 parent variables plus a section devoted to demographic variables: (1) parent's achievement aspirations for the child, (2)…

  14. CMS multicore scheduling strategy

    SciTech Connect

    Perez-Calero Yzquierdo, Antonio; Hernandez, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  15. CMS multicore scheduling strategy

    NASA Astrophysics Data System (ADS)

    Pérez-Calero Yzquierdo, Antonio; Hernández, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison; Cms Collaboration

    2014-06-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue "Moore's Law" style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  16. Class Schedules--Computer Loaded or Student Self-Scheduled?

    ERIC Educational Resources Information Center

    Wall, Edward F.

    1979-01-01

    In the two-step process of student scheduling, the initial phase of course selection is the most important. At Chesterton High School in Indiana, student self-scheduling is preferred over computer loading. (Author/MLF)

  17. Advanced Technology System Scheduling Governance Model

    SciTech Connect

    Ang, Jim; Carnes, Brian; Hoang, Thuc; Vigil, Manuel

    2015-06-11

    In the fall of 2005, the Advanced Simulation and Computing (ASC) Program appointed a team to formulate a governance model for allocating resources and scheduling the stockpile stewardship workload on ASC capability systems. This update to the original document takes into account the new technical challenges and roles for advanced technology (AT) systems and the new ASC Program workload categories that must be supported. The goal of this updated model is to effectively allocate and schedule AT computing resources among all three National Nuclear Security Administration (NNSA) laboratories for weapons deliverables that merit priority on this class of resource. The process outlined below describes how proposed work can be evaluated and approved for resource allocations while preserving high effective utilization of the systems. This approach will provide the broadest possible benefit to the Stockpile Stewardship Program (SSP).

  18. Completable scheduling: An integrated approach to planning and scheduling

    NASA Technical Reports Server (NTRS)

    Gervasio, Melinda T.; Dejong, Gerald F.

    1992-01-01

    The planning problem has traditionally been treated separately from the scheduling problem. However, as more realistic domains are tackled, it becomes evident that the problem of deciding on an ordered set of tasks to achieve a set of goals cannot be treated independently of the problem of actually allocating resources to the tasks. Doing so would result in losing the robustness and flexibility needed to deal with imperfectly modeled domains. Completable scheduling is an approach which integrates the two problems by allowing an a priori planning module to defer particular planning decisions, and consequently the associated scheduling decisions, until execution time. This allows a completable scheduling system to maximize plan flexibility by allowing runtime information to be taken into consideration when making planning and scheduling decision. Furthermore, through the criteria of achievability placed on deferred decision, a completable scheduling system is able to retain much of the goal-directedness and guarantees of achievement afforded by a priori planning. The completable scheduling approach is further enhanced by the use of contingent explanation-based learning, which enables a completable scheduling system to learn general completable plans from example and improve its performance through experience. Initial experimental results show that completable scheduling outperforms classical scheduling as well as pure reactive scheduling in a simple scheduling domain.

  19. Scheduling techniques in the Request Oriented Scheduling Engine (ROSE)

    NASA Technical Reports Server (NTRS)

    Zoch, David R.

    1991-01-01

    Scheduling techniques in the ROSE are presented in the form of the viewgraphs. The following subject areas are covered: agenda; ROSE summary and history; NCC-ROSE task goals; accomplishments; ROSE timeline manager; scheduling concerns; current and ROSE approaches; initial scheduling; BFSSE overview and example; and summary.

  20. External Tank Program Legacy of Success

    NASA Technical Reports Server (NTRS)

    Welzyn, Ken; Pilet, Jeff

    2010-01-01

    I.Goal: a) Extensive TPS damage caused by extreme hail storm. b) Repair plan required to restore TPS to minimize program manifest impacts. II. Challenges: a) Skeptical technical community - Concerned about interactions of damage with known/unknown failure modes. b) Schedule pressure to accommodate ISS program- Next tank still at MAF c)Limited ET resources. III. How d We Do It?: a) Developed unique engineering requirements and tooling to minimize repairs. b) Performed large amount of performance testing to demonstrate understanding of repairs and residual conditions. c) Effectively communicated results to technical community and management to instill confidence in expected performance.

  1. Performance characteristics of gang scheduling in multiprogrammed environments

    SciTech Connect

    Jette, M.A.

    1997-11-01

    Gang scheduling provides both space-slicing and time-slicing of computer resources for parallel programs. Each thread of execution from a parallel job is concurrently scheduled on an independent processor in order to achieve an optimal level of program performance. Time-slicing of parallel jobs provides for better overall system responsiveness and utilization than otherwise possible. Lawrence Livermore National Laboratory has deployed three generations of its gang scheduler on a variety of computing platforms. Results indicate the potential benefits of this technology to parallel processing are no less significant than time-sharing was in the 1960`s.

  2. 17 CFR 210.6A-05 - What schedules are to be filed.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ACT OF 1934, PUBLIC UTILITY HOLDING COMPANY ACT OF 1935, INVESTMENT COMPANY ACT OF 1940, INVESTMENT... audited. Schedule I—Investments. A schedule substantially in form prescribed by § 210.12-12 shall be filed.... Schedule II—Allocation of plan assets and liabilities to investment program. If the plan provides...

  3. Alternative Scheduling Models and Their Effect on Science Achievement at the High School Level

    ERIC Educational Resources Information Center

    Dostal, Jay Roland

    2010-01-01

    This study will evaluate alternative scheduling methods implemented in secondary level schools. Students were selected based on parent selection of programs. Traditional scheduling involves numerous academic subjects with small increments of time in each class and block scheduling focuses on fewer academic subjects and more instructional time.…

  4. Scheduling and Achievement. Research Brief

    ERIC Educational Resources Information Center

    Walker, Karen

    2006-01-01

    To use a block schedule or a traditional schedule? Which structure will produce the best and highest achievement rates for students? The research is mixed on this due to numerous variables such as: (1) socioeconomic levels; (2) academic levels; (3) length of time a given schedule has been in operation; (4) strategies being used in the classrooms;…

  5. FlexMod Scheduling Redux

    ERIC Educational Resources Information Center

    Murray, Shannon

    2008-01-01

    Flexible modular scheduling (flex mod)--a schedule philosophy and system that has been in place at Wausau West High School in Wausau, Wisconsin, for the last 35 years and aligns nicely with current research on student learning--is getting more and more attention from high school administrators across the country. Flexible modular scheduling was…

  6. Flexible Scheduling: Making the Transition

    ERIC Educational Resources Information Center

    Creighton, Peggy Milam

    2008-01-01

    Citing literature that supports the benefits of flexible scheduling on student achievement, the author exhorts readers to campaign for flexible scheduling in their library media centers. She suggests tips drawn from the work of Graziano (2002), McGregor (2006) and Stripling (1997) for making a smooth transition from fixed to flexible scheduling:…

  7. Scheduling a C-Section

    MedlinePlus

    ... Labor & birth > Scheduling a c-section Scheduling a c-section E-mail to a friend Please fill ... develop before she’s born. Why can scheduling a c-section for non-medical reasons be a problem? ...

  8. Toward an Autonomous Telescope Network: the TBT Scheduler

    NASA Astrophysics Data System (ADS)

    Racero, E.; Ibarra, A.; Ocaña, F.; de Lis, S. B.; Ponz, J. D.; Castillo, M.; Sánchez-Portal, M.

    2015-09-01

    Within the ESA SSA program, it is foreseen to deploy several robotic telescopes to provide surveillance and tracking services for hazardous objects. The TBT project will procure a validation platform for an autonomous optical observing system in a realistic scenario, consisting of two telescopes located in Spain and Australia, to collect representative test data for precursor SSA services. In this context, the planning and scheduling of the night consists of two software modules, the TBT Scheduler, that will allow the manual and autonomous planning of the night, and the control of the real-time response of the system, done by the RTS2 internal scheduler. The TBT Scheduler allocates tasks for both telescopes without human intervention. Every night it takes all the inputs needed and prepares the schedule following some predefined rules. The main purpose of the scheduler is the distribution of the time for follow-up of recently discovered targets and surveys. The TBT Scheduler considers the overall performance of the system, and combine follow-up with a priori survey strategies for both kind of objects. The strategy is defined according to the expected combined performance for both systems the upcoming night (weather, sky brightness, object accessibility and priority). Therefore, TBT Scheduler defines the global approach for the network and relies on the RTS2 internal scheduler for the final detailed distribution of tasks at each sensor.

  9. Spike: Artificial intelligence scheduling for Hubble space telescope

    NASA Technical Reports Server (NTRS)

    Johnston, Mark; Miller, Glenn; Sponsler, Jeff; Vick, Shon; Jackson, Robert

    1990-01-01

    Efficient utilization of spacecraft resources is essential, but the accompanying scheduling problems are often computationally intractable and are difficult to approximate because of the presence of numerous interacting constraints. Artificial intelligence techniques were applied to the scheduling of the NASA/ESA Hubble Space Telescope (HST). This presents a particularly challenging problem since a yearlong observing program can contain some tens of thousands of exposures which are subject to a large number of scientific, operational, spacecraft, and environmental constraints. New techniques were developed for machine reasoning about scheduling constraints and goals, especially in cases where uncertainty is an important scheduling consideration and where resolving conflicts among conflicting preferences is essential. These technique were utilized in a set of workstation based scheduling tools (Spike) for HST. Graphical displays of activities, constraints, and schedules are an important feature of the system. High level scheduling strategies using both rule based and neural network approaches were developed. While the specific constraints implemented are those most relevant to HST, the framework developed is far more general and could easily handle other kinds of scheduling problems. The concept and implementation of the Spike system are described along with some experiments in adapting Spike to other spacecraft scheduling domains.

  10. Automated observation scheduling for the VLT

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.

    1988-01-01

    It is becoming increasingly evident that, in order to optimize the observing efficiency of large telescopes, some changes will be required in the way observations are planned and executed. Not all observing programs require the presence of the astronomer at the telescope: for those programs which permit service observing it is possible to better match planned observations to conditions at the telescope. This concept of flexible scheduling has been proposed for the VLT: based on current and predicted environmental and instrumental observations which make the most efficient possible use of valuable time. A similar kind of observation scheduling is already necessary for some space observatories, such as Hubble Space Telescope (HST). Space Telescope Science Institute is presently developing scheduling tools for HST, based on the use of artificial intelligence software development techniques. These tools could be readily adapted for ground-based telescope scheduling since they address many of the same issues. The concept are described on which the HST tools are based, their implementation, and what would be required to adapt them for use with the VLT and other ground-based observatories.

  11. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... Items), Schedule L (Balance Sheets per Books), Schedule M-1 (Reconciliation of Income (Loss) per Books.... (Schedule K-1), Balance Sheets per Books (Schedule L), Reconciliation of Income (Loss) per Books With...

  12. Revisiting conjugate schedules.

    PubMed

    MacAleese, Kenneth R; Ghezzi, Patrick M; Rapp, John T

    2015-07-01

    The effects of conjugate reinforcement on the responding of 13 college students were examined in three experiments. Conjugate reinforcement was provided via key presses that changed the clarity of pictures displayed on a computer monitor in a manner proportional to the rate of responding. Experiment 1, which included seven parameters of clarity change per response, revealed that responding decreased as the percentage clarity per response increased for all five participants. These results indicate that each participant's responding was sensitive to intensity change, which is a parameter of conjugate reinforcement schedules. Experiment 2 showed that responding increased during conjugate reinforcement phases and decreased during extinction phases for all four participants. Experiment 3 also showed that responding increased during conjugate reinforcement and further showed that responding decreased during a conjugate negative punishment condition for another four participants. Directions for future research with conjugate schedules are briefly discussed. PMID:26150349

  13. Revisiting conjugate schedules.

    PubMed

    MacAleese, Kenneth R; Ghezzi, Patrick M; Rapp, John T

    2015-07-01

    The effects of conjugate reinforcement on the responding of 13 college students were examined in three experiments. Conjugate reinforcement was provided via key presses that changed the clarity of pictures displayed on a computer monitor in a manner proportional to the rate of responding. Experiment 1, which included seven parameters of clarity change per response, revealed that responding decreased as the percentage clarity per response increased for all five participants. These results indicate that each participant's responding was sensitive to intensity change, which is a parameter of conjugate reinforcement schedules. Experiment 2 showed that responding increased during conjugate reinforcement phases and decreased during extinction phases for all four participants. Experiment 3 also showed that responding increased during conjugate reinforcement and further showed that responding decreased during a conjugate negative punishment condition for another four participants. Directions for future research with conjugate schedules are briefly discussed.

  14. Pseudomonas Type III effector AvrPto suppresses the programmed cell death induced by two nonhost pathogens in Nicotiana benthamiana and tomato.

    PubMed

    Kang, Li; Tang, Xiaoyan; Mysore, Kirankumar S

    2004-12-01

    Many gram-negative bacterial pathogens rely on a type III secretion system to deliver a number of effector proteins into the host cell. Though a number of these effectors have been shown to contribute to bacterial pathogenicity, their functions remain elusive. Here we report that AvrPto, an effector known for its ability to interact with Pto and induce Pto-mediated disease resistance, inhibited the hypersensitive response (HR) induced by nonhost pathogen interactions. Pseudomonas syringae pv. tomato T1 causes an HR-like cell death on Nicotiana benthamiana. This rapid cell death was delayed significantly in plants inoculated with P. syringae pv. tomato expressing avrPto. In addition, P. syringae pv. tabaci expressing avrPto suppressed nonhost HR on tomato prf3 and ptoS lines. Transient expression of avrPto in both N. benthamiana and tomato prf3 plants also was able to suppress nonhost HR. Interestingly, AvrPto failed to suppress cell death caused by other elicitors and nonhost pathogens. AvrPto also failed to suppress cell death caused by certain gene-for-gene disease resistance interactions. Experiments with avrPto mutants revealed several residues important for the suppression effects. AvrPto mutants G2A, G99V, P146L, and a 12-amino-acid C-terminal deletion mutant partially lost the suppression ability, whereas S94P and 196T enhanced suppression of cell death in N. benthamiana. These results, together with other discoveries, demonstrated that suppression of host-programmed cell death may serve as one of the strategies bacterial pathoens use for successful invasion. PMID:15597738

  15. Guidelines for clinical engineering programs--Part III: the risk of electrical shock in hospitals; Part IV: isolated power in anesthetizing locations? History of an appeal.

    PubMed

    Ridgway, M

    1981-01-01

    This four-part series presents guidelines for: electrically isolated inputs and outputs; measuring the performance of hospital biomedical engineering programs; evaluation the risk of electric shock in hospitals; and for isolated power in anesthetizing locations. Parts I and II, covering the first two topics above, were published in the Oct.-Dec. 1980 issue of this Journal. Part III constitutes an attempt to place the risk of electric shock in hospitals in a quantitative perspective. Arguments are presented that indicate that electrical safety precautions usually take up a larger share of the hospital's biomedical equipment safety budget than is justified by the actual hazard levels. Part IV reviews the need for isolated power in anesthetizing locations. Three independently proposed revisions to the 1973 edition of NFPA Standard 56A would have significantly simplified the safety requirements for hospital anesthetizing locations (a) by reducing the area in flammable locations classified as hazardous to the internationally accepted "zone of risk," and (b) by permitting the use of conventional electrical power rather than isolated power in locations where the risk of electrical accidents can be shown to be no greater than it is in other areas of the hospital. Despite extensive technical testimony supported with substantial supporting documentation, the revisions were vetoed by the Technical Committee after they were voted into the document by a floor vote of the general membership attending the NFPA Annual Meeting in Anaheim in 1978. The chronology of the major events surrounding the subsequent appeal of this veto is traced back to 1974, and an analysis is presented of what are considered to be shortcomings in the NFPA appeals process revealed by this particular case history.

  16. 49 CFR 237.101 - Scheduling of bridge inspections.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... bridge, and the weight and frequency of traffic carried on the bridge. (c) Each bridge management program... bridge inspections. (a) Each bridge management program shall include a provision for scheduling an... for in the bridge management program when a railroad bridge engineer determines that such...

  17. 49 CFR 237.101 - Scheduling of bridge inspections.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... bridge, and the weight and frequency of traffic carried on the bridge. (c) Each bridge management program... bridge inspections. (a) Each bridge management program shall include a provision for scheduling an... for in the bridge management program when a railroad bridge engineer determines that such...

  18. Establishment of a prenatal diagnosis schedule as part of a prophylaxis program of factor XIII deficiency in the southeast of Iran.

    PubMed

    Naderi, Majid; Reykande, Samira Esmaeili; Dorgalaleh, Akbar; Alizadeh, Shaban; Tabibian, Shadi; Einollahi, Nahid; Moghaddam, Ebrahim Miri

    2016-01-01

    Factor XIII deficiency (FXIIID) is an extremely rare bleeding disorder with a prevalence of 1 in 3 million in the general population. Compared to its global incidence, it has the greatest prevalence in Sistan and Baluchistan Province in the southeast of Iran. The high incidence of FXIIID in this region causes a high rate of morbidity and mortality among the affected individuals because of life-threatening episodes such as central nervous system (CNS) bleeding, umbilical cord bleeding, as well as miscarriage. CNS bleeding leads to a considerable number of neurological and behavioral complications. Therefore, we have designed an established prenatal diagnosis (PND) program to prevent the increasing incidence of life-threatening bleeding episodes and related complications among neonates with congenital FXIIID. This study was conducted from September 2013 to August 2014. A consent form was signed by the parents. Fetal sampling was done via abdominal chorionic villus sampling passage under local anesthesia and ultrasonic guidance within the first trimester of pregnancy. Fetal DNA was extracted, and PCR-restriction fragment length polymorphism was performed for the only reported mutation of FXIII (Trp187Arg) in the southeast of Iran. During the period of study, PND was performed on eight fetuses. Six fetuses were offspring of parental consanguineous marriages, and all of them had a positive family history of FXIIID. Seven out of the eight fetuses had a family member with CNS bleeding due to FXIIID. Four fetuses had a FXIIID-related death. One of the fetuses bore homozygous Trp187Arg mutation, whereas six were heterozygous, and one of the mothers gave birth to an unaffected fetus. To the best of our knowledge, PND is a possible solution to control high incidence of life-threatening episodes of FXIIID in southeast Iran.

  19. Parallel scheduling of recursively defined arrays

    NASA Technical Reports Server (NTRS)

    Myers, T. J.; Gokhale, M. B.

    1986-01-01

    A new method of automatic generation of concurrent programs which constructs arrays defined by sets of recursive equations is described. It is assumed that the time of computation of an array element is a linear combination of its indices, and integer programming is used to seek a succession of hyperplanes along which array elements can be computed concurrently. The method can be used to schedule equations involving variable length dependency vectors and mutually recursive arrays. Portions of the work reported here have been implemented in the PS automatic program generation system.

  20. Using the principles of circadian physiology enhances shift schedule design

    SciTech Connect

    Connolly, J.J.; Moore-Ede, M.C.

    1987-01-01

    Nuclear power plants must operate 24 h, 7 days a week. For the most part, shift schedules currently in use at nuclear power plants have been designed to meet operational needs without considering the biological clocks of the human operators. The development of schedules that also take circadian principles into account is a positive step that can be taken to improve plant safety by optimizing operator alertness. These schedules reduce the probability of human errors especially during backshifts. In addition, training programs that teach round-the-clock workers how to deal with the problems of shiftwork can help to optimize performance and alertness. These programs teach shiftworkers the underlying causes of the sleep problems associated with shiftwork and also provide coping strategies for improving sleep and dealing with the transition between shifts. When these training programs are coupled with an improved schedule, the problems associated with working round-the-clock can be significantly reduced.

  1. Geomechanical variability within the D-E Member of the lower Tuscaloosa Formation supporting the SECARB Phase III CO2 Injection Program

    NASA Astrophysics Data System (ADS)

    Rinehart, A. J.; Dewers, T. A.; Broome, S.; Newell, P.

    2014-12-01

    We characterize the mechanical properties at near in-situ conditions of Lower Tuscaloosa lithologies at the Cranfield-site Southeast Regional Carbon Sequestration Partnership (SECARB) Phase III injection program. Four lithofacies in the injection horizon are chosen for strength testing, including: chlorite-cemented conglomeratic sandstone (CSS); mixed chlorite- and quartz-cemented cross-bedded fine sandstone (XSS); quartz-cemented tabular very fine sandstone (TSS); and quartz-cemented siltstone (SiS). Each lithofacies had 25-mm diameter by at least 50-mm length samples plugged. We performed a suite of compression tests for the sandstone at 100°C and pore pressure of 30 MPa, including near-zero effective confining pressure triaxial test, axisymmetric compression tests, and hydrostatic compression test. Sandstones were saturated with supercritical CO2-equilibrated brine with 30 MPa pore pressure. SiS samples were equilibrated at a constant relative humidity of 77% at 100°C. TSS had the largest yield and failure envelopes. XSS had slightly smaller yield and failure envelopes. CSS was by far the weakest. The sandy facies' effective unconfined tests showed rounded peaks, indicating viscous deformation during damage. SiS had strengths intermediate to TSS and XSS, and CSS. The chemical environment mechanically changed CSS, with cement type exerting control on strength. Constitutive behavior is modeled with elasto-plastic and viscous models. Essential features describing mechanical behavior include non-associative plasticity, stress-invariant dependent failure, elliptical cap surface, kinematic and isotropic hardening, non linear elasticity and elastic-plastic coupling. We discuss the influence of CO2 injection on geomechanical properties. This material is based upon work supported as part of the Center for Frontiers of Subsurface Energy Security, an Energy Frontier Research Center funded by the U.S. Department of Energy, Office of Science, Office of Basic Energy

  2. Software Schedules Missions, Aids Project Management

    NASA Technical Reports Server (NTRS)

    2008-01-01

    NASA missions require advanced planning, scheduling, and management, and the Space Agency has worked extensively to develop the programs and software suites necessary to facilitate these complex missions. These enormously intricate undertakings have hundreds of active components that need constant management and monitoring. It is no surprise, then, that the software developed for these tasks is often applicable in other high-stress, complex environments, like in government or industrial settings. NASA work over the past few years has resulted in a handful of new scheduling, knowledge-management, and research tools developed under contract with one of NASA s partners. These tools have the unique responsibility of supporting NASA missions, but they are also finding uses outside of the Space Program.

  3. Grid scheduling divisible loads from two sources

    SciTech Connect

    Moges, M.A.; Yu, D.; Robertazzi, T.

    2009-07-10

    To date closed form solutions for optimal finish time and job allocation are largely obtained only for network topologies with a single load originating (root) processor. However in large-scale data intensive problems with geographically distributed resources, load is generated from multiple sources. This paper introduces a new divisible load scheduling strategy for single level tree networks with two load originating processors. Solutions for an optimal allocation of fractions of load to nodes in single level tree networks are obtained via linear programming. A unique scheduling strategy that allows one to obtain closed form solutions for the optimal finish time and load allocation for each processor in the network is also presented. The tradeoff between linear programming and closed form solutions in terms of underlying assumptions is examined. Finally, a performance evaluation of a two source homogeneous single level tree network with concurrent communication strategy is presented.

  4. Automated Platform Management System Scheduling

    NASA Technical Reports Server (NTRS)

    Hull, Larry G.

    1990-01-01

    The Platform Management System was established to coordinate the operation of platform systems and instruments. The management functions are split between ground and space components. Since platforms are to be out of contact with the ground more than the manned base, the on-board functions are required to be more autonomous than those of the manned base. Under this concept, automated replanning and rescheduling, including on-board real-time schedule maintenance and schedule repair, are required to effectively and efficiently meet Space Station Freedom mission goals. In a FY88 study, we developed several promising alternatives for automated platform planning and scheduling. We recommended both a specific alternative and a phased approach to automated platform resource scheduling. Our recommended alternative was based upon use of exactly the same scheduling engine in both ground and space components of the platform management system. Our phased approach recommendation was based upon evolutionary development of the platform. In the past year, we developed platform scheduler requirements and implemented a rapid prototype of a baseline platform scheduler. Presently we are rehosting this platform scheduler rapid prototype and integrating the scheduler prototype into two Goddard Space Flight Center testbeds, as the ground scheduler in the Scheduling Concepts, Architectures, and Networks Testbed and as the on-board scheduler in the Platform Management System Testbed. Using these testbeds, we will investigate rescheduling issues, evaluate operational performance and enhance the platform scheduler prototype to demonstrate our evolutionary approach to automated platform scheduling. The work described in this paper was performed prior to Space Station Freedom rephasing, transfer of platform responsibility to Code E, and other recently discussed changes. We neither speculate on these changes nor attempt to predict the impact of the final decisions. As a consequence some of our

  5. Development of demographic norms for four new WAIS-III/WMS-III indexes.

    PubMed

    Lange, Rael T; Chelune, Gordon J; Taylor, Michael J; Woodward, Todd S; Heaton, Robert K

    2006-06-01

    Following the publication of the third edition Wechsler scales (i.e., WAIS-III and WMS-III), demographically corrected norms were made available in the form of a computerized scoring program (i.e., WAIS-III/WMS-III/WIAT-II Scoring Assistant). These norms correct for age, gender, ethnicity, and education. Since then, four new indexes have been developed: the WAIS-III General Ability Index, the WMS-III Delayed Memory Index, and the two alternate Immediate and Delayed Memory Indexes. The purpose of this study was to develop demographically corrected norms for the four new indexes using the standardization sample and education oversample from the WAIS-III and WMS-III. These norms were developed using the same methodology as the demographically corrected norms made available in the WAIS-III/WMS-III/WIAT-II Scoring Assistant.

  6. Development of demographic norms for four new WAIS-III/WMS-III indexes.

    PubMed

    Lange, Rael T; Chelune, Gordon J; Taylor, Michael J; Woodward, Todd S; Heaton, Robert K

    2006-06-01

    Following the publication of the third edition Wechsler scales (i.e., WAIS-III and WMS-III), demographically corrected norms were made available in the form of a computerized scoring program (i.e., WAIS-III/WMS-III/WIAT-II Scoring Assistant). These norms correct for age, gender, ethnicity, and education. Since then, four new indexes have been developed: the WAIS-III General Ability Index, the WMS-III Delayed Memory Index, and the two alternate Immediate and Delayed Memory Indexes. The purpose of this study was to develop demographically corrected norms for the four new indexes using the standardization sample and education oversample from the WAIS-III and WMS-III. These norms were developed using the same methodology as the demographically corrected norms made available in the WAIS-III/WMS-III/WIAT-II Scoring Assistant. PMID:16768593

  7. Integrated scheduling and resource management. [for Space Station Information System

    NASA Technical Reports Server (NTRS)

    Ward, M. T.

    1987-01-01

    This paper examines the problem of integrated scheduling during the Space Station era. Scheduling for Space Station entails coordinating the support of many distributed users who are sharing common resources and pursuing individual and sometimes conflicting objectives. This paper compares the scheduling integration problems of current missions with those anticipated for the Space Station era. It examines the facilities and the proposed operations environment for Space Station. It concludes that the pattern of interdependecies among the users and facilities, which are the source of the integration problem is well structured, allowing a dividing of the larger problem into smaller problems. It proposes an architecture to support integrated scheduling by scheduling efficiently at local facilities as a function of dependencies with other facilities of the program. A prototype is described that is being developed to demonstrate this integration concept.

  8. The integrated scheduling system: A case study in project management

    NASA Technical Reports Server (NTRS)

    Bishop, Peter C.; Learned, David B.; Yoes, Cissy A.

    1989-01-01

    A prototype project management system was developed for the Level III Project Office for the Space Station Freedom. The main goal was to establish a framework for the Space Station Project Office whereby Project and Office Managers can jointly establish and review scheduled milestones and activities. The objective was to assist office managers in communicating their objectives, milestones, schedules, and other project information more effectively and efficiently. Consideration of sophisticated project management systems was included, but each of the systems had limitations in meeting the stated objectives.

  9. XOPPS - OEL PROJECT PLANNER/SCHEDULER TOOL

    NASA Technical Reports Server (NTRS)

    Mulnix, C. L.

    1994-01-01

    XOPPS is a window-based graphics tool for scheduling and project planning that provides easy and fast on-screen WYSIWYG editing capabilities. It has a canvas area which displays the full image of the schedule being edited. The canvas contains a header area for text and a schedule area for plotting graphic representations of milestone objects in a flexible timeline. XOPPS is object-oriented, but it is unique in its capability for creating objects that have date attributes. Each object on the screen can be treated as a unit for moving, editing, etc. There is a mouse interface for simple control of pointer location. The user can position objects to pixel resolution, but objects with an associated date are positioned automatically in their correct timeline position in the schedule area. The schedule area has horizontal lines across the page with capabilities for multiple pages and for editing the number of lines per page and the line grid. The text on a line can be edited and a line can be moved with all objects on the line moving with it. The timeline display can be edited to plot any time period in a variety of formats from Fiscal year to Calendar Year and days to years. Text objects and image objects (rasterfiles and icons) can be created for placement anywhere on the page. Milestone event objects with a single associated date (and optional text and milestone symbol) and activity objects with start and end dates (and an optional completion date) have unique editing panels for entering data. A representation for schedule slips is also provided with the capability to automatically convert a milestone event to a slip. A milestone schedule on another computer can be saved to an ASCII file to be read by XOPPS. The program can print a schedule to a PostScript file. Dependencies between objects can also be displayed on the chart through the use of precedence lines. This program is not intended to replace a commercial scheduling/project management program. Because XOPPS has

  10. Minimizing metastatic risk in radiotherapy fractionation schedules

    NASA Astrophysics Data System (ADS)

    Badri, Hamidreza; Ramakrishnan, Jagdish; Leder, Kevin

    2015-11-01

    Metastasis is the process by which cells from a primary tumor disperse and form new tumors at distant anatomical locations. The treatment and prevention of metastatic cancer remains an extremely challenging problem. This work introduces a novel biologically motivated objective function to the radiation optimization community that takes into account metastatic risk instead of the status of the primary tumor. In this work, we consider the problem of developing fractionated irradiation schedules that minimize production of metastatic cancer cells while keeping normal tissue damage below an acceptable level. A dynamic programming framework is utilized to determine the optimal fractionation scheme. We evaluated our approach on a breast cancer case using the heart and the lung as organs-at-risk (OAR). For small tumor α /β values, hypo-fractionated schedules were optimal, which is consistent with standard models. However, for relatively larger α /β values, we found the type of schedule depended on various parameters such as the time when metastatic risk was evaluated, the α /β values of the OARs, and the normal tissue sparing factors. Interestingly, in contrast to standard models, hypo-fractionated and semi-hypo-fractionated schedules (large initial doses with doses tapering off with time) were suggested even with large tumor α/β values. Numerical results indicate the potential for significant reduction in metastatic risk.

  11. Schedule-induced licking during multiple schedules1

    PubMed Central

    Jacquet, Yasuko Filby

    1972-01-01

    Schedule-induced polydipsia was studied in rats bar pressing under two-component multiple schedules of food reinforcement. The first component of the multiple schedule was a variable-interval 1-min schedule throughout the experiment. The schedule comprising the second component was varied over blocks of sessions in terms of rate and magnitude of reinforcement, and was either variable-interval 3-min (one pellet), variable-interval 3-min (three pellets), variable-interval 1-min (one pellet), or extinction. Water intake per session varied with the rate of reinforcement in the schedule comprising the second component and was highest when the schedule was variable-interval 1-min. Both bar-pressing behavior and licking behavior showed behavioral interactions between the two components of the multiple schedules. With magnitude of reinforcement held constant, a matching relationship was observed between lick rate and reinforcement rate; the relative frequency of licks in the constant component matched the relative frequency of reinforcement in that component. Bar pressing, however, showed only a moderate degree of relativity matching. During the schedule-induced licking, a burst of licking followed each delivery of a pellet (post-prandial drinking). The duration of these bursts of licking was observed to be a function of the inter-reinforcement interval. PMID:16811598

  12. 1993 Wholesale Power and Transmission Rate Schedules.

    SciTech Connect

    US Bonneville Power Administration

    1993-10-01

    Bonneville Power Administration 1993 Wholesale Power Rate Schedules and General Rate Schedule Provisions and 1993 Transmission Rate Schedules and General Transmission Rate Schedule Provisions, contained herein, were approved on an interim basis effective October 1, 1993. These rate schedules and provisions were approved by the Federal Energy Commission, United States Department of Energy, in September, 1993. These rate schedules and provisions supersede the Administration`s Wholesale Power Rate Schedules and General Rate Schedule Provisions and Transmission Rate Schedules and General Transmission Rate Schedule Provisions effective October 1, 1991.

  13. DTS: Building custom, intelligent schedulers

    NASA Technical Reports Server (NTRS)

    Hansson, Othar; Mayer, Andrew

    1994-01-01

    DTS is a decision-theoretic scheduler, built on top of a flexible toolkit -- this paper focuses on how the toolkit might be reused in future NASA mission schedulers. The toolkit includes a user-customizable scheduling interface, and a 'Just-For-You' optimization engine. The customizable interface is built on two metaphors: objects and dynamic graphs. Objects help to structure problem specifications and related data, while dynamic graphs simplify the specification of graphical schedule editors (such as Gantt charts). The interface can be used with any 'back-end' scheduler, through dynamically-loaded code, interprocess communication, or a shared database. The 'Just-For-You' optimization engine includes user-specific utility functions, automatically compiled heuristic evaluations, and a postprocessing facility for enforcing scheduling policies. The optimization engine is based on BPS, the Bayesian Problem-Solver (1,2), which introduced a similar approach to solving single-agent and adversarial graph search problems.

  14. Constraint-Based Modeling and Scheduling of Clinical Pathways

    NASA Astrophysics Data System (ADS)

    Wolf, Armin

    In this article a constraint-based modeling of clinical pathways, in particular of surgical pathways, is introduced and used for an optimized scheduling of their tasks. The addressed optimization criteria are based on practical experiences in the area of Constraint Programming applications in medical work flow management. Objective functions having empirical evidence for their adequacy in the considered use cases are formally presented. It is shown how they are respected while scheduling clinical pathways.

  15. COMPASS: An Ada based scheduler

    NASA Technical Reports Server (NTRS)

    Mcmahon, Mary Beth; Culbert, Chris

    1992-01-01

    COMPASS is a generic scheduling system developed by McDonnell Douglas and funded by the Software Technology Branch of NASA Johnson Space Center. The motivation behind COMPASS is to illustrate scheduling technology and provide a basis from which custom scheduling systems can be built. COMPASS was written in Ada to promote readability and to conform to DOD standards. COMPASS has some unique characteristics that distinguishes it from commercial products. This paper discusses these characteristics and uses them to illustrate some differences between scheduling tools.

  16. An Innovative Approach to Resident Scheduling: Use of a Point-Based System to Account for Resident Preferences

    PubMed Central

    Chow, Robert Tao-Ping; Tamhane, Shrikant; Zhang, Manling; Fisher, Lori-Ann; Yoon, Jenni; Sehgal, Sameep; Lumbres, Madel; Han, Ma Ai Thanda; Win, Tiffany

    2015-01-01

    Background The scheduling of residents for rotation assignments and on-call responsibilities is a time-consuming process that challenges the resources of residency programs. Assignment of schedules is traditionally done by chief residents or program administration with variable input from the residents involved. Intervention We introduced an innovative point-based scheduling system to increase transparency in the scheduling process, foster a sense of fairness and equality in scheduling, and increase resident ownership for making judicious scheduling choices. Methods We devised a point-based system in which each resident in our 40-member program was allocated an equal number of points. The residents assigned these points to their preferred choices of rotations. Residents were then surveyed anonymously on their perceptions of this new scheduling system and were asked to compare it with their traditional scheduling system. Results The schedule was successfully implemented, and it allowed residents to express their scheduling preferences using an innovative point-based approach. Residents were generally satisfied with the new system, would recommend it to other programs, and perceived a greater sense of involvement. However, resident satisfaction with the new system was not significantly greater compared with the previous approach to scheduling (P = .20). Chief residents expressed satisfaction with the new scheduling model. Conclusions Residents were equally satisfied with the traditional preference-based scheduling approach and the new point-based system. Chief residents' feedback on the new system reflected reduced stress and time commitment in the new point-based system. PMID:26457154

  17. OPPS - OEL PROJECT PLANNER/SCHEDULER

    NASA Technical Reports Server (NTRS)

    Murphy, S. C.

    1994-01-01

    OPPS is a window-based graphics tool that provides easy and fast on-screen WYSIWYG editing capabilities. It has a canvas area which displays a full image of the schedule being edited. The canvas contains a header area (for text) and a schedule area (for plotting graphic representations of milestone objects in a flexible timeline). The OPPS tool is object-oriented, but it is unique in its capability for creating objects that have date attributes. Each object on the screen can be treated as a unit for moving, editing, etc. There is a mouse interface for simple control of pointer location. The user can position objects to pixel resolution, but objects with an associated date are positioned automatically in their correct timeline position in the schedule area. The schedule area has horizontal lines across the page with capabilities for multiple pages and for editing the number of lines per page and the line grid. The text on a line can be edited and a line can be moved with all objects on the line moving with it. The timeline display can be edited to plot any time period in a variety of formats from Fiscal Year to Calendar Year and days to years. Text objects and image objects (rasterfiles and icons) can be created for placement anywhere on the page. Milestone event objects with a single associated date (and optional text and milestone symbol) and activity objects with start and end dates (and an optional completion date) have unique editing panels for entering data. A representation for schedule slips is also provided. A milestone schedule can be saved to an ASCII file on another computer to be read by OPPS. The program can also print a schedule to a PostScript file. This program is not intended to replace a commercial scheduling/project management program. It does not provide the capability for defining dependencies between activities; dates must be provided manually. However, because OPPS has an ASCII file interface it can be used in conjunction with a project

  18. An Analysis of Shuttle Crew Scheduling Violations

    NASA Technical Reports Server (NTRS)

    Bristol, Douglas

    2012-01-01

    From the early years of the Space Shuttle program, National Aeronautics and Space Administration (NASA) Shuttle crews have had a timeline of activities to guide them through their time on-orbit. Planners used scheduling constraints to build timelines that ensured the health and safety of the crews. If a constraint could not be met it resulted in a violation. Other agencies of the federal government also have scheduling constraints to ensure the safety of personnel and the public. This project examined the history of Space Shuttle scheduling constraints, constraints from Federal agencies and branches of the military and how these constraints may be used as a guide for future NASA and private spacecraft. This was conducted by reviewing rules and violations with regard to human aerospace scheduling constraints, environmental, political, social and technological factors, operating environment and relevant human factors. This study includes a statistical analysis of Shuttle Extra Vehicular Activity (EVA) related violations to determine if these were a significant producer of constraint violations. It was hypothesized that the number of SCSC violations caused by EVA activities were a significant contributor to the total number of violations for Shuttle/ISS missions. Data was taken from NASA data archives at the Johnson Space Center from Space Shuttle/ISS missions prior to the STS-107 accident. The results of the analysis rejected the null hypothesis and found that EVA violations were a significant contributor to the total number of violations. This analysis could help NASA and commercial space companies understand the main source of constraint violations and allow them to create constraint rules that ensure the safe operation of future human private and exploration missions. Additional studies could be performed to evaluate other variables that could have influenced the scheduling violations that were analyzed.

  19. An Excerpt From Evaluation of Title III Programs in the Detroit Public Schools (A Report of the Third Years' Activities). Part One.

    ERIC Educational Resources Information Center

    Rosenfeld, Michael; Wilkes, Ronald

    The specific focus of this document is on the evolutionary development of the Neighborhood Educational Center Project supported under Title III, 1965 Elementary Secondary Act, which was marked by continual evaluation and appropriate modification. Application of the concepts of individualized instruction was one of the basic means by which the…

  20. PACE. A Program for Acquiring Competence in Entrepreneurship. Part III: Being an Entrepreneur. Unit D: Marketing Management. Research and Development Series No. 194 C-4.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. National Center for Research in Vocational Education.

    This three-part curriculum for entrepreneurship education is primarily for postsecondary level, including four-year colleges and adult education, but it can be adapted for special groups or vocational teacher education. The emphasis of the eight instructional units in Part III is operating a business. Unit D focuses on market management. It…