Science.gov

Sample records for iii program scheduling

  1. 21 CFR 1308.13 - Schedule III.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 9 2012-04-01 2012-04-01 false Schedule III. 1308.13 Section 1308.13 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE SCHEDULES OF CONTROLLED SUBSTANCES Schedules § 1308.13 Schedule III. (a) Schedule III shall consist of the drugs and other substances,...

  2. 21 CFR 1308.13 - Schedule III.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule III. 1308.13 Section 1308.13 Food and Drugs DRUG ENFORCEMENT ADMINISTRATION, DEPARTMENT OF JUSTICE SCHEDULES OF CONTROLLED SUBSTANCES Schedules § 1308.13 Schedule III. (a) Schedule III shall consist of the drugs and other substances,...

  3. Schedule-Tracker Computer Program

    NASA Technical Reports Server (NTRS)

    Collazo, Fernando F.

    1990-01-01

    Schedule Tracker provides effective method for tracking tasks "past due" and/or "near term". Generates reports for each responsible staff member having one or more assigned tasks falling within two listed categories. Schedule Organizer (SO) (COSMIC program MSC-21525), Schedule Tracker (ST), and Schedule Report Generator (SRG) (COSMIC program MSC-21527) computer programs manipulating data-base files in ways advantageous in scheduling. Written in PL/1 and DEC Command Language (DCL).

  4. SO - SCHEDULE ORGANIZER COMPUTER PROGRAM

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer SO, Schedule Tracker, ST (COSMIC Program MSC-21526), and Report Generator, SRG (COSMIC Program MSC-21527), are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Tracker provides an effective method for tracking tasks that are 'past due' and/or 'near term'. ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are scheduled for recent completion (near term). Schedule Report Generator provides a simple method for generating periodic schedule reports. SO contains the following primary menu that is displayed at the beginning of the program. The menu provides options: to write input files to an output distribution file, to change a schedule title field and/or distribution list field, to browse through the schedule and input names file for requested schedule numbers, to create an input names file and a schedule titles file, and to delete input schedule titles and associated names. SO provides a choice of two input files. One file holds twenty-five groups of up to twenty-five names for each group. The other file holds twenty-five records, each of which may hold a task schedule title. SO creates three output files. One holds the formatted list of schedule titles for printout. Another file holds the formatted distribution list for printout; there is one for each input names file schedule group. The third output file holds the last schedule title deleted by

  5. ST - SCHEDULE TRACKER COMPUTER PROGRAM

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer, SO (COSMIC Program MSC-21525), Schedule Tracker, ST, and Schedule Report Generator, SRG (COSMIC Program MSC-21527), are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Tracker provides an effective method for tracking tasks that are 'past due' and/or 'near term'. ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are scheduled for recent completion (near term). Schedule Report Generator provides a simple method for generating periodic schedule reports. ST and SRG use the same data base file as input. The common data base file has a maximum number of 400 entries. The time span of all three programs is nineteen months. Both of these maximum numbers can be modified by the user. ST requires the VMS Operating System on DEC VAX and was written in PL/1 and DEC Command Language (DCL). The program requires a memory of 233KB. ST can be purchased separately or in a package (COSMIC Program COS-10021) containing SO, ST, and SRG. ST was developed in 1985.

  6. S-CHART - SCHEDULING CHART PROGRAM

    NASA Technical Reports Server (NTRS)

    Klinkner, E. R.

    1994-01-01

    The Scheduling Chart Program (S-Chart) uses simple menu choices to produce high quality Gantt type scheduling and production time-line charts with minimal data entry requirements. The software produces high quality charts (20, 40, and 80 day options) in 10-20 minutes including start up, data entry, and printing. Reprints take less than one minute. Some of the more significant features are as follows: speed and ease of use with menu driven selections from start to finish, storage and catalogs of all data sets for rapid access and manipulation, compact program size to permit storage of dozens of data sets on the program disc, and creation of ASCII text files of graphs for rapid printing. The final product of the plot routine is an extended ASCII character file which shows the events scheduled and actual work dates. This file may be printed from the program, from DOS, or imported to a word processor for customizing. S-Chart is not intended to take the place of commercial scheduling/project management software. However, it is a simple, somewhat limited Gantt chart plotter and scheduling tracking program with an emphasis on straightforward data entry. There is no complex relationship building between the scheduled events. Dates are entered as dates, not as algebraic functions. All the files of S-Chart, except for the graph picture and the stand-alone executable, were written in 100% dBASE III compatible code. The executable code was created with CLIPPER and the graph picture files are written in ASCII code. S-Chart was implemented on an IBM PC series machine under DOS and requires 215k bytes of memory. The program was developed in 1988.

  7. Scheduling: A guide for program managers

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The following topics are discussed concerning scheduling: (1) milestone scheduling; (2) network scheduling; (3) program evaluation and review technique; (4) critical path method; (5) developing a network; (6) converting an ugly duckling to a swan; (7) network scheduling problem; (8) (9) network scheduling when resources are limited; (10) multi-program considerations; (11) influence on program performance; (12) line-of-balance technique; (13) time management; (14) recapitulization; and (15) analysis.

  8. 78 FR 72013 - Schedules of Controlled Substances: Placement of Perampanel into Schedule III

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-02

    ...) benzonitrile], including its salts, isomers, and salts of isomers, into schedule III of the Controlled... concludes that perampanel, including its salts, isomers, and salts of isomers, warrants control in schedule... number of small entities. The purpose of this rule is to place perampanel, including its salts,...

  9. Schedules of controlled substances: rescheduling of hydrocodone combination products from schedule III to schedule II. Final rule.

    PubMed

    2014-08-22

    With the issuance of this final rule, the Administrator of the Drug Enforcement Administration reschedules hydrocodone combination products from schedule III to schedule II of the Controlled Substances Act. This scheduling action is pursuant to the Controlled Substances Act which requires that such actions be made on the record after opportunity for a hearing through formal rulemaking. This action imposes the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule II controlled substances on persons who handle (manufacture, distribute, dispense, import, export, engage in research, conduct instructional activities with, conduct chemical analysis with, or possess) or propose to handle hydrocodone combination products.

  10. 77 FR 60743 - Proposed Collection; Comment Request for Schedule F, Part II and III (Form 1040)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-04

    ... Internal Revenue Service Proposed Collection; Comment Request for Schedule F, Part II and III (Form 1040... Law 104-13 (44 U.S.C. 3506(c)(2)(A)). Currently, the IRS is soliciting comments concerning Schedule F... Number: Schedule F, Part II and III (Form 1040). Abstract: Schedule F, Part II and III (Form 1040)...

  11. Scheduling Guide for Program Managers

    DTIC Science & Technology

    2001-10-01

    and val- leys are evened out without scheduling more work than nine people can do. In this ex- ample, this rearrangement can be accom- plished quickly...full advantage of event- driven scheduling. Additional information on the development of IMSs can be found in various sections of the Defense

  12. SO/ST/SRG - SCHEDULING PROGRAMS

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer, SO (COSMIC Program MSC-21525), Schedule Tracker, ST (COSMIC Program MSC-21526), and Report Generator, SRG (COSMIC Program MSC-21527), are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Organizer contains a primary menu that is displayed at the beginning of the program. The menu provides options as follows: to write input files to an output distribution file, to change a schedule title field and/or distribution list field, to browse through the schedule and input names file for requested schedule numbers, to create an input names file and a schedule titles file, and to delete input schedule titles and associated names. SO provides a choice of two input files. One file holds 25 groups of up to 25 names for each group. The other file holds 25 records. Each 60-character-long record holds a task schedule title or it is a blank entry. SO creates three output files. One holds the formatted list of schedule titles for printout. Another file holds the formatted distribution list for printout. There is one for each input names file schedule group. The third output file holds the schedule title of the last schedule title file deleted by the user. Schedule Tracker provides an effective method for tracking tasks that are "past due" and/or "near term". ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are scheduled for recent completion (near term

  13. SRG - SCHEDULE REPORT GENERATOR COMPUTER PROGRAM

    NASA Technical Reports Server (NTRS)

    Collazo, F. F.

    1994-01-01

    The Schedule Organizer, SO (COSMIC Program MSC-21525), Schedule Tracker, ST (COSMIC Program MSC-21526), and Schedule Report Generator, SRG, are programs that manipulate data base files in ways that are advantageous to scheduling applications. Originally designed for the Space Shuttle flight schedule, the program can be easily modified for other scheduling situations. Schedule Organizer provides a simple method for generating distribution lists. These distribution lists contain readers' names for each task schedule defined by the input files. Schedule Tracker provides an effective method for tracking tasks that are 'past due' and/or 'near term'. ST generates reports for each responsible staff member with one or more assigned tasks that fall within the two listed categories. This enables an engineering manager to monitor tasks assigned to staff by running ST on a weekly basis. ST only lists tasks on reports that have become past due or are schedule for recent completion (near term). Schedule Reports Generator provides a simple method for generating periodic schedule reports. SRG enables an engineering manager to monitor tasks assigned to staff members on a weekly basis. SRG sorts three types of reports using one or more data fields as sort keys. One type is sorted using the calendar year as the primary key and the end date as the secondary key. Another type is sorted by flight number. A third type of report, Waterfall plots, is also generated by SRG using the end date as the sorting key. SRG requires as input a single file or two concatenated files with up to 400 single line entries. The user constructs the input file by using the LSE editor VAX utility prior to the execution of the program. The user is able to modify the current functional description text lines just displayed. ST and SRG use the same data base file as input. The common data base file has a maximum number of 400 entries. The time span of all three programs is nineteen months. Both of these maximum

  14. Scheduling parallel programs in distributed systems

    SciTech Connect

    Rommel, C.G.

    1988-01-01

    Scheduling parallel programs under the processor-sharing discipline for uniprocessors, multiprocessors, and distributed systems was studied. Two classes of parallel programs are considered: those without any IPC (called Fork-Join jobs) and those with asynchronous and uniform IPC (called clusters). The study is divided into two parts: (1) develops analytical solutions for Fork-Join Jobs on uniprocessors and multiprocessors; and (2) develops and evaluates via simulation Fork-Join jobs and clusters on distributed systems. The types of site scheduling studied are TS-PS where tasks of a job are scheduled independently at processor-sharing servers, JS-PS in which tasks of a job are scheduled as a single entity at processor-sharing servers, and FCFS where tasks of a job are scheduled independently by order of arrival. For Poisson job arrivals and exponentially distributed task service times, analytical solutions and computationally efficient bounds were found for Fork-Join TS-PS and JS-PS job response times. An algorithm was developed to schedule parallel programs in distributed systems. Over a wide range of parameters the algorithms was found to be superior to both no-load balancing, NLB, and shortest-queue first scheduling, SQF.

  15. Advanced Reactors Transition Program Resource Loaded Schedule

    SciTech Connect

    BOWEN, W.W.

    1999-11-08

    The Advanced Reactors Transition (ART) Resource Loaded Schedule (RLS) provides a cost and schedule baseline for managing the project elements within the ART Program. The Fast Flux Test Facility (FFTF) activities are delineated through the end of FY 2000, assuming continued standby. The Nuclear Energy (NE) Legacies and Plutonium Recycle Test Reactor (PRTR) activities are delineated through the end of the deactivation process. This document reflects the 1 Oct 1999 baseline.

  16. Advanced Reactors Transition Program Resource Loaded Schedule

    SciTech Connect

    GANTT, D.A.

    2000-01-12

    The Advanced Reactors Transition (ART) Resource Loaded Schedule (RLS) provides a cost and schedule baseline for managing the project elements within the ART Program. The Fast Flux Test Facility (FETF) activities are delineated through the end of FY 2000, assuming continued standby. The Nuclear Energy (NE) Legacies and Plutonium Recycle Test Reactor (PRTR) activities are delineated through the end of the deactivation process. This revision reflects the 19 Oct 1999 baseline.

  17. An integrated scheduling and program management system

    NASA Astrophysics Data System (ADS)

    Porter, D.; Gibson, J. D.; Williams, G. G.

    2012-09-01

    An integrated scheduling and program management system is being developed for the MMT Observatory (MMTO), Arizona, USA. A systems engineering approach is used to combine existing and new relational databases, spreadsheets, file storage systems, and web-based user interfaces into a single unified system. An overview of software design, data management, user interfaces, and techniques for performance assessment is presented. Goals of this system include streamlined data management and an optimized user experience. The MMTO has over a dozen different telescope configurations, including three secondary mirrors and a wide range of observing instruments. Scheduling is complex for the varying telescope configurations, limited available observing time, and appropriate astronomic conditions (e.g., lunar phase) for each science project. Scheduled telescope configurations can be used to perform safety checks of actual configuration during telescope operations. Programmatic information is automatically input into nightly telescope operator (TO) logs by the system. The TO's provide additional information into the system on telescope usage, observing conditions (e.g., weather conditions), and observatory closure (e.g., from instrument malfunction or inclement weather). All of this information is synthesized to assess telescope and observatory performance. Web interfaces to the system can be used by observers to submit information, such as travel plans, instrumentation requirements, and observing catalogs. A service request (SR) (i.e., trouble report) system has also been developed for tracking operational issues. The specific needs of the MMTO have been met through in-house software development of this integrated scheduling and program management system.

  18. DSN seven day/twelve week schedule program

    NASA Technical Reports Server (NTRS)

    Holzman, R. E.

    1968-01-01

    Deep Space Network scheduling program allocates resources based on the users requirements. The system reviews and allocates the requests for equipment and resources. Depending upon the program input either the seven day or the twelve week schedule is generated.

  19. Runway Scheduling Using Generalized Dynamic Programming

    NASA Technical Reports Server (NTRS)

    Montoya, Justin; Wood, Zachary; Rathinam, Sivakumar

    2011-01-01

    A generalized dynamic programming method for finding a set of pareto optimal solutions for a runway scheduling problem is introduced. The algorithm generates a set of runway fight sequences that are optimal for both runway throughput and delay. Realistic time-based operational constraints are considered, including miles-in-trail separation, runway crossings, and wake vortex separation. The authors also model divergent runway takeoff operations to allow for reduced wake vortex separation. A modeled Dallas/Fort Worth International airport and three baseline heuristics are used to illustrate preliminary benefits of using the generalized dynamic programming method. Simulated traffic levels ranged from 10 aircraft to 30 aircraft with each test case spanning 15 minutes. The optimal solution shows a 40-70 percent decrease in the expected delay per aircraft over the baseline schedulers. Computational results suggest that the algorithm is promising for real-time application with an average computation time of 4.5 seconds. For even faster computation times, two heuristics are developed. As compared to the optimal, the heuristics are within 5% of the expected delay per aircraft and 1% of the expected number of runway operations per hour ad can be 100x faster.

  20. Program For Editing Graphical Displays Of Schedules

    NASA Technical Reports Server (NTRS)

    Mulnix, Cassie L.; Miller, Kevin

    1995-01-01

    XOPPS is window-based software tool from graphics providing easy and fast "what you see is what you get" (WYSIWYG) on-screen editing capabilities. Provides area, analogous to canvas, displaying full image of schedule being edited. Canvas contains header area (for test) and schedule area (for plotting graphical representations of milestone objects in flexible time line). Written in C language.

  1. International Space Programs. Aerospace Education III.

    ERIC Educational Resources Information Center

    Bulmer, S. B.

    This book, one in the series on Aerospace Education III, is a collection of the diverse information available regarding the international space programs. The five goals listed for the book are: to examine the Soviet space program, to understand the future of Soviet space activity, to examine other national and international space programs, to…

  2. 33 CFR Schedule III to Subpart A... - Calling-in Table

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... to Subpart A of Part 401 Navigation and Navigable Waters SAINT LAWRENCE SEAWAY DEVELOPMENT... Schedule III to Subpart A of Part 401—Calling-in Table C.I.P. and checkpoint Station to call Message... 1. Name of vessel.2. Location. 3. ETA Cape Vincent or River Port. 15. Whale back Shoal—Con...

  3. Scheduling IT staff at a bank: a mathematical programming approach.

    PubMed

    Labidi, M; Mrad, M; Gharbi, A; Louly, M A

    2014-01-01

    We address a real-world optimization problem: the scheduling of a Bank Information Technologies (IT) staff. This problem can be defined as the process of constructing optimized work schedules for staff. In a general sense, it requires the allocation of suitably qualified staff to specific shifts to meet the demands for services of an organization while observing workplace regulations and attempting to satisfy individual work preferences. A monthly shift schedule is prepared to determine the shift duties of each staff considering shift coverage requirements, seniority-based workload rules, and staff work preferences. Due to the large number of conflicting constraints, a multiobjective programming model has been proposed to automate the schedule generation process. The suggested mathematical model has been implemented using Lingo software. The results indicate that high quality solutions can be obtained within a few seconds compared to the manually prepared schedules.

  4. Scheduling IT Staff at a Bank: A Mathematical Programming Approach

    PubMed Central

    Labidi, M.; Mrad, M.; Gharbi, A.; Louly, M. A.

    2014-01-01

    We address a real-world optimization problem: the scheduling of a Bank Information Technologies (IT) staff. This problem can be defined as the process of constructing optimized work schedules for staff. In a general sense, it requires the allocation of suitably qualified staff to specific shifts to meet the demands for services of an organization while observing workplace regulations and attempting to satisfy individual work preferences. A monthly shift schedule is prepared to determine the shift duties of each staff considering shift coverage requirements, seniority-based workload rules, and staff work preferences. Due to the large number of conflicting constraints, a multiobjective programming model has been proposed to automate the schedule generation process. The suggested mathematical model has been implemented using Lingo software. The results indicate that high quality solutions can be obtained within a few seconds compared to the manually prepared schedules. PMID:24772032

  5. International Space Programs. Aerospace Education III.

    ERIC Educational Resources Information Center

    Air Univ., Maxwell AFB, AL. Junior Reserve Office Training Corps.

    This curriculum guide is prepared for the Aerospace Education III series publication entitled "International Space Programs." The guide is organized according to specific chapters in the textbook. It provides guidelines for teachers in terms of objectives, behavioral objectives, suggested outlines, orientation, suggested key points,…

  6. 21 CFR 1312.30 - Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 9 2011-04-01 2011-04-01 false Schedule III, IV, and V non-narcotic controlled... Controlled Substances § 1312.30 Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit. The following Schedule III, IV, and V non-narcotic controlled substances...

  7. 21 CFR 1312.30 - Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 9 2014-04-01 2014-04-01 false Schedule III, IV, and V non-narcotic controlled... Controlled Substances § 1312.30 Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit. The following Schedule III, IV, and V non-narcotic controlled substances...

  8. 21 CFR 1312.30 - Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 9 2013-04-01 2013-04-01 false Schedule III, IV, and V non-narcotic controlled... Controlled Substances § 1312.30 Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit. The following Schedule III, IV, and V non-narcotic controlled substances...

  9. 21 CFR 1312.30 - Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 9 2012-04-01 2012-04-01 false Schedule III, IV, and V non-narcotic controlled... Controlled Substances § 1312.30 Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit. The following Schedule III, IV, and V non-narcotic controlled substances...

  10. 21 CFR 1312.30 - Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Schedule III, IV, and V non-narcotic controlled... Controlled Substances § 1312.30 Schedule III, IV, and V non-narcotic controlled substances requiring an import and export permit. The following Schedule III, IV, and V non-narcotic controlled substances...

  11. Healdsburg Bilingual Education. Content Analysis Schedule for Bilingual Education Programs.

    ERIC Educational Resources Information Center

    Hess, Richard T.; Shore, Marietta Saravia

    This content analysis schedule for the Bilingual Education Program of the Healdsburg Union Elementary School District of Healdsburg, California, presents information on the history, funding, and scope of the project in its second year. Included are sociolinguistic process variables such as the native and dominant languages of students and their…

  12. Microgrid Reliability Modeling and Battery Scheduling Using Stochastic Linear Programming

    SciTech Connect

    Cardoso, Goncalo; Stadler, Michael; Siddiqui, Afzal; Marnay, Chris; DeForest, Nicholas; Barbosa-Povoa, Ana; Ferrao, Paulo

    2013-05-23

    This paper describes the introduction of stochastic linear programming into Operations DER-CAM, a tool used to obtain optimal operating schedules for a given microgrid under local economic and environmental conditions. This application follows previous work on optimal scheduling of a lithium-iron-phosphate battery given the output uncertainty of a 1 MW molten carbonate fuel cell. Both are in the Santa Rita Jail microgrid, located in Dublin, California. This fuel cell has proven unreliable, partially justifying the consideration of storage options. Several stochastic DER-CAM runs are executed to compare different scenarios to values obtained by a deterministic approach. Results indicate that using a stochastic approach provides a conservative yet more lucrative battery schedule. Lower expected energy bills result, given fuel cell outages, in potential savings exceeding 6percent.

  13. Synchronizing production and air transportation scheduling using mathematical programming models

    NASA Astrophysics Data System (ADS)

    Zandieh, M.; Molla-Alizadeh-Zavardehi, S.

    2009-08-01

    Traditional scheduling problems assume that there are always infinitely many resources for delivering finished jobs to their destinations, and no time is needed for their transportation, so that finished products can be transported to customers without delay. So, for coordination of these two different activities in the implementation of a supply chain solution, we studied the problem of synchronizing production and air transportation scheduling using mathematical programming models. The overall problem is decomposed into two sub-problems, which consists of air transportation allocation problem and a single machine scheduling problem which they are considered together. We have taken into consideration different constraints and assumptions in our modeling such as special flights, delivery tardiness and no delivery tardiness. For these purposes, a variety of models have been proposed to minimize supply chain total cost which encompass transportation, makespan, delivery earliness tardiness and departure time earliness tardiness costs.

  14. Energy-optimal programming and scheduling of the manufacturing operations

    NASA Astrophysics Data System (ADS)

    Badea, N.; Frumuşanu, G.; Epureanu, A.

    2016-08-01

    The shop floor energy system covers the energy consumed for both the air conditioning and manufacturing processes. At the same time, most of energy consumed in manufacturing processes is converted in heat released in the shop floor interior and has a significant influence on the microclimate. Both these components of the energy consumption have a time variation that can be realistic assessed. Moreover, the consumed energy decisively determines the environmental sustainability of the manufacturing operation, while the expenditure for running the shop floor energy system is a significant component of the manufacturing operations cost. Finally yet importantly, the energy consumption can be fundamentally influenced by properly programming and scheduling of the manufacturing operations. In this paper, we present a method for modeling and energy-optimal programming & scheduling the manufacturing operations. In this purpose, we have firstly identified two optimization targets, namely the environmental sustainability and the economic efficiency. Then, we have defined three optimization criteria, which can assess the degree of achieving these targets. Finally, we have modeled the relationship between the optimization criteria and the parameters of programming and scheduling. In this way, it has been revealed that by adjusting these parameters one can significantly improve the sustainability and efficiency of manufacturing operations. A numerical simulation has proved the feasibility and the efficiency of the proposed method.

  15. Schedule Best Practices Provide Opportunity to Enhance Missile Defense Agency Accountability and Program Execution

    DTIC Science & Technology

    2012-07-19

    accountability of MDA programs, in the April 2012 review; instead, we are providing in this report (1) the results of how the MDA program schedules compare...developed for several months at a time instead of for the life of the program. As a result, our findings on the specific program schedules are limited...practices, and some had major deficiencies. These results are significant because a reliable schedule is one key factor that indicates a program is

  16. Mixed Integer Programming and Heuristic Scheduling for Space Communication Networks

    NASA Technical Reports Server (NTRS)

    Cheung, Kar-Ming; Lee, Charles H.

    2012-01-01

    We developed framework and the mathematical formulation for optimizing communication network using mixed integer programming. The design yields a system that is much smaller, in search space size, when compared to the earlier approach. Our constrained network optimization takes into account the dynamics of link performance within the network along with mission and operation requirements. A unique penalty function is introduced to transform the mixed integer programming into the more manageable problem of searching in a continuous space. The constrained optimization problem was proposed to solve in two stages: first using the heuristic Particle Swarming Optimization algorithm to get a good initial starting point, and then feeding the result into the Sequential Quadratic Programming algorithm to achieve the final optimal schedule. We demonstrate the above planning and scheduling methodology with a scenario of 20 spacecraft and 3 ground stations of a Deep Space Network site. Our approach and framework have been simple and flexible so that problems with larger number of constraints and network can be easily adapted and solved.

  17. 21 CFR 1301.28 - Exemption from separate registration for practitioners dispensing or prescribing Schedule III, IV...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... practitioners dispensing or prescribing Schedule III, IV, or V narcotic controlled drugs approved by the Food..., or V narcotic controlled drugs approved by the Food and Drug Administration specifically for use in..., IV, or V narcotic controlled drugs or combinations of narcotic controlled drugs which have...

  18. 21 CFR 1301.28 - Exemption from separate registration for practitioners dispensing or prescribing Schedule III, IV...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... practitioners dispensing or prescribing Schedule III, IV, or V narcotic controlled drugs approved by the Food..., or V narcotic controlled drugs approved by the Food and Drug Administration specifically for use in..., IV, or V narcotic controlled drugs or combinations of narcotic controlled drugs which have...

  19. 21 CFR 1301.28 - Exemption from separate registration for practitioners dispensing or prescribing Schedule III, IV...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... practitioners dispensing or prescribing Schedule III, IV, or V narcotic controlled drugs approved by the Food..., or V narcotic controlled drugs approved by the Food and Drug Administration specifically for use in..., IV, or V narcotic controlled drugs or combinations of narcotic controlled drugs which have...

  20. 21 CFR 1301.28 - Exemption from separate registration for practitioners dispensing or prescribing Schedule III, IV...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... practitioners dispensing or prescribing Schedule III, IV, or V narcotic controlled drugs approved by the Food..., or V narcotic controlled drugs approved by the Food and Drug Administration specifically for use in..., IV, or V narcotic controlled drugs or combinations of narcotic controlled drugs which have...

  1. 21 CFR 1301.28 - Exemption from separate registration for practitioners dispensing or prescribing Schedule III, IV...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... practitioners dispensing or prescribing Schedule III, IV, or V narcotic controlled drugs approved by the Food..., or V narcotic controlled drugs approved by the Food and Drug Administration specifically for use in..., IV, or V narcotic controlled drugs or combinations of narcotic controlled drugs which have...

  2. 21 CFR 1306.25 - Transfer between pharmacies of prescription information for Schedules III, IV, and V controlled...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 9 2011-04-01 2011-04-01 false Transfer between pharmacies of prescription... Substances Listed in Schedules III, IV, and V § 1306.25 Transfer between pharmacies of prescription... purpose of refill dispensing is permissible between pharmacies on a one-time basis only....

  3. 21 CFR 1306.25 - Transfer between pharmacies of prescription information for Schedules III, IV, and V controlled...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Transfer between pharmacies of prescription... Substances Listed in Schedules III, IV, and V § 1306.25 Transfer between pharmacies of prescription... between pharmacies on a one time basis only. However, pharmacies electronically sharing a real-time,...

  4. Project Scheduling Tool for Maintaining Capability Interdependencies and Defence Program Investment: A User’s Guide

    DTIC Science & Technology

    2014-09-01

    UNCLASSIFIED Project Scheduling Tool for Maintaining Capability Interdependencies and Defence Program Investment: A User’s Guide M.-T. Nguyen Joint...product, the Project Scheduling Tool (version 1.4). The tool implements various mathematical Integer Linear Programming models, as well as an approach that...Scheduling Tool for Maintaining Capability Interdependencies and Defence Program Investment: A User’s Guide Executive Summary Defence decision-makers are faced

  5. The Role of Television Program Content and Scheduling in Patterns of Choice.

    ERIC Educational Resources Information Center

    Anast, Adrian; Webster, James Garrison

    A study investigated the influence of television program type and scheduling characteristics on patterns of program choice. The problem to be explored was the relative contribution of program content to patterns of audience flow. Soap operas were scheduled on competing channels with the assumption that audience duplication between pairs of these…

  6. Advanced Emissions Control Development Program: Phase III

    SciTech Connect

    G.T. Amrhein; R.T. Bailey; W. Downs; M.J. Holmes; G.A. Kudlac; D.A. Madden

    1999-07-01

    The primary objective of the Advanced Emissions Control Development Program (AECDP) is to develop practical, cost-effective strategies for reducing the emissions of air toxics from coal-fired boilers. The project goal is to effectively control air toxic emissions through the use of conventional flue gas clean-up equipment such as electrostatic precipitators (ESPs), fabric filters (baghouses - BH), and wet flue gas desulfurization systems (WFGD). Development work concentrated on the capture of trace metals, fine particulate, hydrogen chloride and hydrogen fluoride, with an emphasis on the control of mercury. The AECDP project is jointly funded by the US Department of Energy's Federal Energy Technology Center (DOE), the Ohio Coal Development Office within the Ohio Department of Development (OCDO), and Babcock and Wilcox, a McDermott company (B and W). This report discusses results of all three phases of the AECDP project with an emphasis on Phase III activities. Following the construction and evaluation of a representative air toxics test facility in Phase I, Phase II focused on characterization of the emissions of mercury and other air toxics and the control of these emissions for typical operating conditions of conventional flue gas clean-up equipment. Some general comments that can be made about the control of air toxics while burning a high-sulfur bituminous coal are as follows: (1) particulate control devices such as ESP's and baghouses do a good job of removing non-volatile trace metals, (2) particulate control devices (ESPs and baghouses) effectively remove the particulate-phase mercury, but the particulate-phase mercury was only a small fraction of the total for the coals tested, (3) wet scrubbing can effectively remove hydrogen chloride and hydrogen fluoride, and (4) wet scrubbers show good potential for the removal of mercury when operated under certain conditions, however, for certain applications, system enhancements can be required to achieve high

  7. Hanford Environmental Monitoring Program schedule for samples, analyses, and measurements for calendar year 1985

    SciTech Connect

    Blumer, P.J.; Price, K.R.; Eddy, P.A.; Carlile, J.M.V.

    1984-12-01

    This report provides the CY 1985 schedule of data collection for the routine Hanford Surface Environmental Monitoring and Ground-Water Monitoring Programs at the Hanford Site. The purpose is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5484.1. The routine sampling schedule provided herein does not include samples scheduled to be collected during FY 1985 in support of special studies, special contractor support programs, or for quality control purposes. In addition, the routine program outlined in this schedule is subject to modification during the year in response to changes in site operations, program requirements, or unusual sample results.

  8. The Savannah River Site`s groundwater monitoring program: 1990 sampling schedule

    SciTech Connect

    Rogers, C.D.

    1991-02-07

    This schedule provides a final record of the 1990 sampling schedule for the SRS groundwater monitoring program conducted by the Environmental Protection Department/Environmental Section (EPD/EMS). It includes all the wells monitored by EPD/EMS at SRS during 1990 and identifies the constituents sampled, the sampling frequency, and the reasons for sampling. Sampling requests are incorporated into the schedule throughout the year. Drafts of the schedule are produced and revised quarterly.

  9. Content Analysis Schedule for Bilingual Education Programs: Del Valle Bilingual Education Program.

    ERIC Educational Resources Information Center

    Ehrlich, Roselin; Shore, Marietta Saravia

    This content analysis schedule for the Del Valle Bilingual Education Program of Del Valle, Texas, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the…

  10. Phoenix Union Bilingual Program. Content Analysis Schedule for Bilingual Education Programs.

    ERIC Educational Resources Information Center

    Nafus, C.; Shore, Marietta Saravia

    This content analysis schedule for the Phoenix Union Bilingual Program of Phoenix, Arizona, presents information on the history, funding, and scope of the project in its third year. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection…

  11. Santa Fe Bilingual-Bicultural Education Program. Content Analysis Schedule for Bilingual Education Programs.

    ERIC Educational Resources Information Center

    Ludanyi, R. P.; Ehrlich, Roselin

    This content analysis schedule for the Santa Fe Bilingual-Bicultural Education Program of Santa Fe, New Mexico, presents information on the history, funding, and scope of the project in its second year. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is…

  12. Mixed Integer Programming and Heuristic Scheduling for Space Communication

    NASA Technical Reports Server (NTRS)

    Lee, Charles H.; Cheung, Kar-Ming

    2013-01-01

    Optimal planning and scheduling for a communication network was created where the nodes within the network are communicating at the highest possible rates while meeting the mission requirements and operational constraints. The planning and scheduling problem was formulated in the framework of Mixed Integer Programming (MIP) to introduce a special penalty function to convert the MIP problem into a continuous optimization problem, and to solve the constrained optimization problem using heuristic optimization. The communication network consists of space and ground assets with the link dynamics between any two assets varying with respect to time, distance, and telecom configurations. One asset could be communicating with another at very high data rates at one time, and at other times, communication is impossible, as the asset could be inaccessible from the network due to planetary occultation. Based on the network's geometric dynamics and link capabilities, the start time, end time, and link configuration of each view period are selected to maximize the communication efficiency within the network. Mathematical formulations for the constrained mixed integer optimization problem were derived, and efficient analytical and numerical techniques were developed to find the optimal solution. By setting up the problem using MIP, the search space for the optimization problem is reduced significantly, thereby speeding up the solution process. The ratio of the dimension of the traditional method over the proposed formulation is approximately an order N (single) to 2*N (arraying), where N is the number of receiving antennas of a node. By introducing a special penalty function, the MIP problem with non-differentiable cost function and nonlinear constraints can be converted into a continuous variable problem, whose solution is possible.

  13. Navy Occupational Health Information Management System (NOHIMS). Medical Exam Scheduling Module. Program Maintenance Manual

    DTIC Science & Technology

    1987-06-01

    NAVY OCCUPATIONAL HEALTH INFORMATION MANAGEMENT SYSTEM NOH I MS MEDICAL EXAM SCHEDULING MODULE PROGRAM MAINTENANCE MANUAL S JUNE 1987 DT11C 00... Information Management System (NOHIMS) ~ Medical Examination Scheduling (MES) Program Maintenance Manual 7. Author(s) 8. Performing Organization Rapt. No...the Navy Occupational Health Information Management System (NOHIMS). NOHIMS, whose initial version was developed at the Naval Health Research Center

  14. Event-Centered Scheduling Program: The Need for PERT (Program Evaluation Review Technique) in C-141 ISO Inspection Management

    DTIC Science & Technology

    1988-04-01

    1925 TITLE EVENT-CENTERED SCHEDULING PROGRAM: THE NEED FOR PERT IN C-141 ISO INSPECTION MANAGEMENT AUTHOR(S) MAJOR KENT A. MUELLER, USAF FACULTY...UNCLASSIFIED EVENT-CENTERED SCHEDULING PROGRAM: THE NEED FOR PERT IN C-141 ISO MANAGEMENT 12. PERSONAL AUTHOR(S) Mueller, Kent A., Major, USAF 13a. TYPE OF...identify by block number) Scheduled inspections, specifically the C-141 Isochronal Major, consume a significant amount of time as currently managed

  15. Quarterly report on program cost and schedule; First quarter FY 1991

    SciTech Connect

    1991-04-01

    This report is intended to provide a summary of the cost and schedule performance for the Civilian Radioactive Waste Management Program. Historical and current cost profiles (extracted from the DOE Financial Information System) are presented for each of the major program elements. Also included in this report are the reference program schedule, the status of near-term program milestones and the status of the Nuclear Waste Fund revenues and disbursements. This report includes data through December 1990.

  16. Conflicts of Time: Examining School Schedules in Secondary Agricultural Programs

    ERIC Educational Resources Information Center

    Epps, Rebekah B.; Adams, Randy J.; Vincent, Stacy K.

    2015-01-01

    The purpose of this study was to examine how school schedules can or cannot be justified through the perspective of student performance on state core content assessments and occupational skills standards assessments. This study utilized the Theory of Power in Education when considering school schedules as a means to student success on core content…

  17. Classification of two steroids, prostanozol and methasterone, as Schedule III anabolic steroids under the Controlled Substance Act. Final rule.

    PubMed

    2012-07-30

    With the issuance of this Final Rule, the Administrator of the DEA classifies the following two steroids as "anabolic steroids'' under the Controlled Substances Act (CSA): prostanozol (17[beta]-hydroxy-5[alpha]-androstano[3,2-c]pyrazole) and methasterone (2[alpha],17[alpha]-dimethyl-5[alpha]-androstan-17[beta]-ol-3-one). These steroids and their salts, esters, and ethers are Schedule III controlled substances subject to the regulatory control provisions of the CSA.

  18. DOTSYS III: A Portable Program for Braille Translation. Rev. 1.

    ERIC Educational Resources Information Center

    Sullivan, Joseph E., Ed.; And Others

    DOTSYS III is a COBOL program for the translation of English text into standard English braille, also known as grade 2 braille. Text in foreign languages or English may be transliterated as grade 1 braille or "computer" braille. The program's method of operation together with instructions on using the program, modifying or extending the…

  19. Earned Schedule 10 Years Later Analyzing Military Programs

    DTIC Science & Technology

    2014-04-01

    This does not necessarily suggest that ES is inapplicable to the CPM in the DoD. Rather, it points to the necessity of making contractor EVMS reporting...ES against CPM , we stop short of recommending ES as its replacement. However, our analysis indicates ES warrants more intensive use for schedule...complementary tool (i.e. the primary cross-check) to the CPM method that is predominately utilized. Traditional EVM schedule analysis techniques should not be

  20. 15 CFR Schedule I to Part 700 - Approved Programs and Delegate Agencies

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 15 Commerce and Foreign Trade 2 2012-01-01 2012-01-01 false Approved Programs and Delegate Agencies I Schedule I to Part 700 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign... BASE REGULATIONS DEFENSE PRIORITIES AND ALLOCATIONS SYSTEM Pt. 700, Sched. I Schedule I to Part...

  1. 15 CFR Schedule I to Part 700 - Approved Programs and Delegate Agencies

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 15 Commerce and Foreign Trade 2 2013-01-01 2013-01-01 false Approved Programs and Delegate Agencies I Schedule I to Part 700 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign... BASE REGULATIONS DEFENSE PRIORITIES AND ALLOCATIONS SYSTEM Pt. 700, Sched. I Schedule I to Part...

  2. Community College Exemplary Instructional Programs, Volume III.

    ERIC Educational Resources Information Center

    Fideler, Elizabeth F., Ed.; Bazer, Gerald, Ed.

    Third in an annual series, this volume presents brief descriptions of a number of outstanding community college instructional programs identified by the National Council of Instructional Administrators (NCIA). Each description includes the address and telephone number of the college in which the program operates, and the names of the college…

  3. 77 FR 58996 - Multiple Award Schedule (MAS) Program Continuous Open Season-Operational Change; Extension of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-25

    ... From the Federal Register Online via the Government Publishing Office GENERAL SERVICES ADMINISTRATION Multiple Award Schedule (MAS) Program Continuous Open Season-- Operational Change; Extension of Comment Period AGENCY: Federal Acquisition Service (FAS), General Services Administration (GSA)....

  4. Master schedule for CY-1984 Hanford environmental surveillance routine sampling program

    SciTech Connect

    Blumer, P.J.; Price, K.R.; Eddy, P.A.; Carlile, J.M.V.

    1983-12-01

    This report provides the current schedule of data collection for the routine Hanford environmental surveillance and ground-water Monitoring Programs at the Hanford Site. The purpose is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs. The routine sampling schedule provided herein does not include samples that are planned to be collected during FY-1984 in support of special studies, special contractor support programs, or for quality control purposes.

  5. Interdisciplinary Studies Program. Teacher's Guide: Part III.

    ERIC Educational Resources Information Center

    Valencia Community Coll., Orlando, FL.

    This teacher's guide was developed for the third of four courses in Valencia Community College's Interdisciplinary Studies program, a 2-year core general education curriculum which chronologically examines the major developments in the evolution of human knowledge. The guide provides an introductory overview of the course's topic (i.e., Western…

  6. Content Analysis Schedule for Bilingual Education Programs: Proyecto PAL.

    ERIC Educational Resources Information Center

    Gonzalez, Castor

    This content analysis schedule for "Proyecto PAL" in San Jose, California, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the linguistic…

  7. Content Analysis Schedule for Bilingual Education Programs: Catch-Up.

    ERIC Educational Resources Information Center

    Ehrlich, Roselin S.; Shore, Marietta Saravia

    This content analysis schedule for Project Catch-Up in Zapata, Texas, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the linguistic background of project…

  8. 15 CFR Schedule I to Part 700 - Approved Programs and Delegate Agencies

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    .... International defense programs: Canada: D1 Canadian military programs Department of Commerce. D2 Canadian... 15 Commerce and Foreign Trade 2 2010-01-01 2010-01-01 false Approved Programs and Delegate Agencies I Schedule I to Part 700 Commerce and Foreign Trade Regulations Relating to Commerce and...

  9. 15 CFR Schedule I to Part 700 - Approved Programs and Delegate Agencies

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    .... International defense programs: Canada: D1 Canadian military programs Department of Commerce. D2 Canadian... 15 Commerce and Foreign Trade 2 2011-01-01 2011-01-01 false Approved Programs and Delegate Agencies I Schedule I to Part 700 Commerce and Foreign Trade Regulations Relating to Commerce and...

  10. Environmental Technology Verification (ETV) Program Case Studies: Demonstrating Program Outcomes, Volume III

    EPA Science Inventory

    This booklet, ETV Program Case Studies: Demonstrating Program Outcomes, Volume III contains two case studies, addressing verified environmental technologies for decentalized wastewater treatment and converting animal waste to energy. Each case study contains a brief description ...

  11. Compile-Time Schedulability Analysis of Communicating Concurrent Programs

    DTIC Science & Technology

    2006-06-28

    are Ptolemy [1], Metropolis [8], and YAPI [20]. YAPI is developed at Philips research labs as an implementation of Kahn process network based on...the applicability of quasi-static scheduling for practical applications. 88 Bibliography [1] The ptolemy project. URL: http://ptolemy.eecs.berkeley.edu... Ptolemy : A framework for simulating and prototyping heterogenous systems. Int. Journal in Computer Simulation, 4(2):0–, 1994. [13] Y. Chen, W. T. Tsai, and

  12. Cyclical scheduling for welfare assistants using 0-1 goal programming

    NASA Astrophysics Data System (ADS)

    Rashid, Nur Rasyida Mohd; Ismail, Wan Rosmanira; Ismail, Norul Fadhilah; Kapi, Azyan Yusra

    2015-05-01

    Currently, the welfare assistants scheduling are handled manually by the head of the welfare assistants and every record is kept in paper. The head of the welfare assistants has to go through a very tedious process to complete the schedule every months in order to conform to the organizations policy as well as to satisfy the welfare assistants' preferences. However, the scheduling task is very time consuming and the staff preferences are not fully satisfied. This paper presents a 0-1 goal programming approach to build a cyclical scheduling for every 60 days and is adapted to welfare assistant schedule in an orphanage institution. This systematic model is built to improve the current manual method of scheduling. The model is implemented using LINGO software. The result shows that each staff has an equal percentage of 62%, 38% and 32% for total duty, night shift and day off respectively. Thus, the proposed model offered better result by providing a cyclical schedule that is better and give higher satisfaction and fairness to the staff than the current manually developed schedule.

  13. Idaho National Engineering Laboratory Environmental Restoration Program Schedule Contingency Evaluation Report

    SciTech Connect

    Not Available

    1993-09-01

    This report represents the schedule contingency evaluation done on the FY-93 Major System Acquisition (MSA) Baseline for the Idaho National Engineering Laboratory`s (INEL) Environmental Restoration Program (EPP). A Schedule Contingency Evaluation Team (SCET) was established to evaluate schedule contingency on the MSA Baseline for the INEL ERP associated with completing work within milestones established in the baseline. Baseline schedules had been established considering enforceable deadlines contained in the Federal Facilities Agreement/Consent Order (FFA/CO), the agreement signed in 1992, by the State of Idaho, Department of Health & Welfare, the U.S. Environmental Protection Agency, Region 10, and the U.S. Department of Energy, Idaho Operations Office. The evaluation was based upon the application of standard schedule risk management techniques to the specific problems of the INEL ERP. The schedule contingency evaluation was designed to provided early visibility for potential schedule delays impacting enforceable deadlines. The focus of the analysis was on the duration of time needed to accomplish all required activities to achieve completion of the milestones in the baseline corresponding to the enforceable deadlines. Additionally, the analysis was designed to identify control of high-probability, high-impact schedule risk factors.

  14. Optimized Waterspace Management and Scheduling Using Mixed-Integer Linear Programming

    DTIC Science & Technology

    2016-01-01

    TECHNICAL REPORT NSWC PCD TR 2015-003 OPTIMIZED WATERSPACE MANAGEMENT AND SCHEDULING USING MIXED-INTEGER LINEAR PROGRAMMING...effects on optimization quality . 24 3 NSWC PCD TR 2015-003 Optimized Waterspace Mgt 1 Introduction The use of autonomous systems to perform increasingly...constraints required for the mathematical formulation of the MCM scheduling problem pertaining to the survey constraints and logistics management . The

  15. FFTF and Advanced Reactors Transition Program Resource Loaded Schedule

    SciTech Connect

    GANTT, D.A.

    2000-10-31

    This Resource Load Schedule (RLS) addresses two missions. The Advanced Reactors Transition (ART) mission, funded by DOE-EM, is to transition assigned, surplus facilities to a safe and compliant, low-cost, stable, deactivated condition (requiring minimal surveillance and maintenance) pending eventual reuse or D&D. Facilities to be transitioned include the 309 Building Plutonium Recycle Test Reactor (PRTR) and Nuclear Energy Legacy facilities. This mission is funded through the Environmental Management (EM) Project Baseline Summary (PBS) RL-TP11, ''Advanced Reactors Transition.'' The second mission, the Fast Flux Test Facility (FFTF) Project, is funded through budget requests submitted to the Office of Nuclear Energy, Science and Technology (DOE-NE). The FFTF Project mission is maintaining the FFTF, the Fuels and Materials Examination Facility (FMEF), and affiliated 400 Area buildings in a safe and compliant standby condition. This mission is to preserve the condition of the plant hardware, software, and personnel in a manner not to preclude a plant restart. This revision of the Resource Loaded Schedule (RLS) is based upon the technical scope in the latest revision of the following project and management plans: Fast Flux Test Facility Standby Plan (Reference 1); Hanford Site Sodium Management Plan (Reference 2); and 309 Building Transition Plan (Reference 4). The technical scope, cost, and schedule baseline is also in agreement with the concurrent revision to the ART Fiscal Year (FY) 2001 Multi-Year Work Plan (MYWP), which is available in an electronic version (only) on the Hanford Local Area Network, within the ''Hanford Data Integrator (HANDI)'' application.

  16. Scheduling language and algorithm development study. Volume 2, phase 2: Introduction to plans programming. [user guide

    NASA Technical Reports Server (NTRS)

    Cochran, D. R.; Ishikawa, M. K.; Paulson, R. E.; Ramsey, H. R.

    1975-01-01

    A user guide for the Programming Language for Allocation and Network Scheduling (PLANS) is presented. Information is included for the construction of PLANS programs. The basic philosophy of PLANS is discussed, and access and update reference techniques are described along with the use of tree structures.

  17. A model for estimating the cost impact of schedule perturbations on aerospace research and development programs

    NASA Technical Reports Server (NTRS)

    Bishop, D. F.

    1972-01-01

    The problem of determining the cost impact attributable to perturbations in an aerospace R and D program schedule is discussed in terms of the diminishing availability of funds. The methodology from which a model is presented for updating R and D cost estimates as a function of perturbations in program time is presented.

  18. A Modular Schedule (Telstar Regional High School's Humanities-Oriented English Program).

    ERIC Educational Resources Information Center

    Russell, Frances M., Ed.

    To better match available time and facilities to the form and content of subject matter, a humanities-oriented English program was coordinated with programs in other content areas and a modular schedule will be set up. Each class day will consist of 24 fifteen-minute modules, and some meeting times will be a multiple of these 15-minute periods. To…

  19. Schedule Management Competencies for Department of Defense Program Managers.

    DTIC Science & Technology

    1995-09-01

    professionalism of their procurement workforce. Models identifying the competencies required of DoD program managers could provide valuable information for ...considered "valuable" to practicing program managers. A complete list of the medians and percentages can be found in Appendix E . Research Question 2... method for providing the standard skills necessary to manage programs. Education and training programs are therefore essential to ensure professionals

  20. Stratospheric Aerosol and Gas Experiment, SAGE III on ISS, An Earth Science Mission on the International Space Station, Schedule Risk Analysis, A Project Perspective

    NASA Technical Reports Server (NTRS)

    Bonine, Lauren

    2015-01-01

    The presentation provides insight into the schedule risk analysis process used by the Stratospheric Aerosol and Gas Experiment III on the International Space Station Project. The presentation focuses on the schedule risk analysis process highlighting the methods for identification of risk inputs, the inclusion of generic risks identified outside the traditional continuous risk management process, and the development of tailored analysis products used to improve risk informed decision making.

  1. 36 CFR 1225.24 - When can an agency apply previously approved schedules to electronic records?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... system; (iii) Organizational unit(s) or agency program that records support; (iv) Current disposition... approved schedule to digital versions. If changes in the approved schedule are required, follow § 1225.26... the previously approved schedule. If changes in the approved schedule are required, follow §...

  2. Program Documentation of the Plant Job Scheduling Model System

    DTIC Science & Technology

    1987-11-30

    Model is used to make initial computer runs and the Post Processor Model for subsequent "what if" evaluations . Accessing the programs for model runs and...changes to existing conventional ammunition programs and budoets based on varied options, and quickly evaluate efi,.cts of the changes. 2.2 System...up by FY, the screen would organize the data for that block in ascending order by ypar . 5.16.3 Verification Procedures. Verification of the program

  3. Assessing Weapon System Acquisition Cycle Times: Setting Program Schedules

    DTIC Science & Technology

    2015-06-01

    insights for the CIRCM program. This program is developing a lightweight laser countermeasure system for smaller helicopters. The device will use a laser ...beam to confuse infrared (IR)-guided missile seekers. The existing protection for such helicopters is the Common Missile Warning System (CMWS...Missile Warning System CDD Capabilities Development Document CIRCM Common Infrared Countermeasures CM Cruise Missile CPD Capabilities Production

  4. A vehicle scheduling algorithm using non-serial discrete dynamic programming with space shuttle applications

    NASA Technical Reports Server (NTRS)

    Dupnick, E.

    1973-01-01

    Description of the development and operation of a vehicle-scheduling algorithm which has applications to the NASA problem of assigning payloads to space delivery vehicles. The algorithm is based on a discrete, integer-valued, nonserial, dynamic-programming solution to the classical problem of developing resource utilization plans with limited resources. The algorithm places special emphasis on incorporating interpayload (precedence) relationships; maintaining optimal alternate schedule definitions (a unique feature of dynamic programming) in the event of contingencies (namely, resource inventory changes) without problem resolution; and, by using a special information storage technique, reducing the computational complexity of solving realistic problems.

  5. Intrasystem Electromagnetic Compatibility Analysis Program. Volume III. Computer Program Documentation

    DTIC Science & Technology

    1974-12-01

    ADDRESS 10. PROGRAM ELEMENT, PROJECT, TASK McDonnell Aircraft Company AREA & WORK UNIT NUMBERS McDonnell Douglas Corporation PE 62702F Box 516, St. Louis...TABLE FREQUENCY CLOSEST I’ FMINI IFMX INDEX OF TABLE FREQUENCY CLOSEST TO IFMAXI 62 _________-__ - -- i lbl TABLE 18 (Concluded) PROGRWý NAME

  6. The nurse scheduling problem: a goal programming and nonlinear optimization approaches

    NASA Astrophysics Data System (ADS)

    Hakim, L.; Bakhtiar, T.; Jaharuddin

    2017-01-01

    Nurses scheduling is an activity of allocating nurses to conduct a set of tasks at certain room at a hospital or health centre within a certain period. One of obstacles in the nurse scheduling is the lack of resources in order to fulfil the needs of the hospital. Nurse scheduling which is undertaken manually will be at risk of not fulfilling some nursing rules set by the hospital. Therefore, this study aimed to perform scheduling models that satisfy all the specific rules set by the management of Bogor State Hospital. We have developed three models to overcome the scheduling needs. Model 1 is designed to schedule nurses who are solely assigned to a certain inpatient unit and Model 2 is constructed to manage nurses who are assigned to an inpatient room as well as at Polyclinic room as conjunct nurses. As the assignment of nurses on each shift is uneven, then we propose Model 3 to minimize the variance of the workload in order to achieve equitable assignment on every shift. The first two models are formulated in goal programming framework, while the last model is in nonlinear optimization form.

  7. International Acquisition Programs: Variables Beyond Cost, Schedule and Performance

    DTIC Science & Technology

    2015-02-17

    technology and should seek the best capabilities from the international market .7 Additionally, the US military industrial base has decreased over the...open market competition, the process does introduce some political and program management challenges due to varying participant industrial ...opening access to foreign markets for aircraft sales as well as foreign industrial participation and competition. Opening aircraft acquisition

  8. 76 FR 1366 - Medicare Program; Amendment to Payment Policies Under the Physician Fee Schedule and Other...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-10

    ... HUMAN SERVICES Centers for Medicare & Medicaid Services 42 CFR Part 410 RIN 0938-AP79 Medicare Program; Amendment to Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B for CY 2011 AGENCY: Centers for Medicare & Medicaid Services (CMS), HHS. ACTION: Final rule. SUMMARY: This...

  9. A Proposed Program for Scheduling, Project Management, Control and Instruction. GEM Bulletin 69-17.

    ERIC Educational Resources Information Center

    Reed, Charles P.

    A computer-oriented filing system is considered necessary to handle the approximately 1,500 students likely to be enrolled in the Georgia model program to train elementary teachers (ED 025 491) by the time it reaches sustained operation. The system of individualized scheduling involves establishing and maintaining a computer storage filing system…

  10. Block Scheduling and the End of Course Examination Program (ECOEP): A South Carolina Study

    ERIC Educational Resources Information Center

    Howard, Nanci Elizabeth

    2010-01-01

    This causal-comparative study investigates the differences in the End of Course Examination Program (EOCEP) test scores of ninth grade students in English I and Algebra I/Math for the technologies, as influenced by schedules used in South Carolina public high schools during the 2005-2006 academic year. Framing this study is the previous…

  11. Creation of the selection list for the Experiment Scheduling Program (ESP)

    NASA Technical Reports Server (NTRS)

    Deuermeyer, B. L.; Shannon, R. E.; Underbrink, A. J., Jr.

    1986-01-01

    The efforts to develop a procedure to construct selection groups to augment the Experiment Scheduling Program (ESP) are summarized. Included is a User's Guide and a sample scenario to guide in the use of the software system that implements the developed procedures.

  12. Automatic programming via iterated local search for dynamic job shop scheduling.

    PubMed

    Nguyen, Su; Zhang, Mengjie; Johnston, Mark; Tan, Kay Chen

    2015-01-01

    Dispatching rules have been commonly used in practice for making sequencing and scheduling decisions. Due to specific characteristics of each manufacturing system, there is no universal dispatching rule that can dominate in all situations. Therefore, it is important to design specialized dispatching rules to enhance the scheduling performance for each manufacturing environment. Evolutionary computation approaches such as tree-based genetic programming (TGP) and gene expression programming (GEP) have been proposed to facilitate the design task through automatic design of dispatching rules. However, these methods are still limited by their high computational cost and low exploitation ability. To overcome this problem, we develop a new approach to automatic programming via iterated local search (APRILS) for dynamic job shop scheduling. The key idea of APRILS is to perform multiple local searches started with programs modified from the best obtained programs so far. The experiments show that APRILS outperforms TGP and GEP in most simulation scenarios in terms of effectiveness and efficiency. The analysis also shows that programs generated by APRILS are more compact than those obtained by genetic programming. An investigation of the behavior of APRILS suggests that the good performance of APRILS comes from the balance between exploration and exploitation in its search mechanism.

  13. 10 CFR Appendix D to Part 73 - Physical Protection of Irradiated Reactor Fuel in Transit, Training Program Subject Schedule

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Physical Protection of Irradiated Reactor Fuel in Transit, Training Program Subject Schedule D Appendix D to Part 73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED... Irradiated Reactor Fuel in Transit, Training Program Subject Schedule Pursuant to the provision of § 73.37...

  14. 10 CFR Appendix D to Part 73 - Physical Protection of Irradiated Reactor Fuel in Transit, Training Program Subject Schedule

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Physical Protection of Irradiated Reactor Fuel in Transit, Training Program Subject Schedule D Appendix D to Part 73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED... Irradiated Reactor Fuel in Transit, Training Program Subject Schedule Pursuant to the provision of § 73.37...

  15. 10 CFR Appendix D to Part 73 - Physical Protection of Irradiated Reactor Fuel in Transit, Training Program Subject Schedule

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Physical Protection of Irradiated Reactor Fuel in Transit, Training Program Subject Schedule D Appendix D to Part 73 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED... Irradiated Reactor Fuel in Transit, Training Program Subject Schedule Pursuant to the provision of § 73.37...

  16. A primary shift rotation nurse scheduling using zero-one linear goal programming.

    PubMed

    Huarng, F

    1999-01-01

    In this study, the author discusses the effect of nurse shift schedules on circadian rhythm and some important ergonomics criteria. The author also reviews and compares different nurse shift scheduling methods via the criteria of flexibility, fairness, continuity in shift assignments, nurses' preferences, and ergonomics principles. In this article, a primary shift rotation system is proposed to provide better continuity in shift assignments to satisfy nurses' preferences. The primary shift rotation system is modeled as a zero-one linear goal programming (LGP) problem. To generate the shift assignment for a unit with 13 nurses, the zero-one LGP model takes less than 3 minutes on average, whereas the head nurses spend approximately 2 to 3 hours on shift scheduling. This study reports the process of implementing the primary shift rotation system.

  17. Master schedule for CY-1983 Hanford environmental surveillance routine sampling program

    SciTech Connect

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.; Dirkes, R.L.

    1982-12-01

    The current schedule of data collection for the routine Hanford environmental surveillance and ground-water monitoring programs at the Hanford Site is presented. The purpose of the programs is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs. Radiological monitoring data are reported for air (particulate filter and gases/vapor), Columbia River water, sanitary water, onsite pond water, foodstuffs (whole milk, leafy vegetables, fruit, wheat/alfalfa, beef, poultry/eggs), wildlife, soil and vegetation, and direct radiation. Information is also given for on site radiation control audit surveys (roadway, railway, aerial, and waste disposal sites, and the Hanford ground-water monitoring program.

  18. 78 FR 41785 - Agency Information Collection Activities; Comment Request; Implementation of Title I/II Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-11

    ... Agency Information Collection Activities; Comment Request; Implementation of Title I/II Program... notice will be considered public records. Title of Collection: Implementation of Title I/II Program... Estimated Number of Annual Burden Hours: 6,573. Abstract: The Implementation of Title I/II...

  19. Does the benefits schedule of cash assistance programs affect the purchase of temptation goods?

    PubMed Central

    White, Justin S.; Basu, Sanjay

    2016-01-01

    A critique of cash assistance programs is that beneficiaries may spend the money on “temptation goods” such as alcohol and tobacco. We exploit a change in the payment schedule of Peru’s conditional cash transfer program to identify the impact of benefit receipt frequency on the purchase of temptation goods. We use annual household data among cross-sectional and panel samples to analyze the effect of the policy change on the share of the household budget devoted to four categories of temptation goods. Using a difference-in-differences estimation approach, we find that larger, less frequent payments increased the expenditure share of alcohol by 55–80% and sweets by 10–40%, although the absolute magnitudes of these effects are small. Our study suggests that less frequent benefits scheduling may lead cash recipients to make certain types of temptation purchases. PMID:26874596

  20. Fair Energy Scheduling for Vehicle-to-Grid Networks Using Adaptive Dynamic Programming.

    PubMed

    Xie, Shengli; Zhong, Weifeng; Xie, Kan; Yu, Rong; Zhang, Yan

    2016-08-01

    Research on the smart grid is being given enormous supports worldwide due to its great significance in solving environmental and energy crises. Electric vehicles (EVs), which are powered by clean energy, are adopted increasingly year by year. It is predictable that the huge charge load caused by high EV penetration will have a considerable impact on the reliability of the smart grid. Therefore, fair energy scheduling for EV charge and discharge is proposed in this paper. By using the vehicle-to-grid technology, the scheduler controls the electricity loads of EVs considering fairness in the residential distribution network. We propose contribution-based fairness, in which EVs with high contributions have high priorities to obtain charge energy. The contribution value is defined by both the charge/discharge energy and the timing of the action. EVs can achieve higher contribution values when discharging during the load peak hours. However, charging during this time will decrease the contribution values seriously. We formulate the fair energy scheduling problem as an infinite-horizon Markov decision process. The methodology of adaptive dynamic programming is employed to maximize the long-term fairness by processing online network training. The numerical results illustrate that the proposed EV energy scheduling is able to mitigate and flatten the peak load in the distribution network. Furthermore, contribution-based fairness achieves a fast recovery of EV batteries that have deeply discharged and guarantee fairness in the full charge time of all EVs.

  1. Chemotherapy appointment scheduling under uncertainty using mean-risk stochastic integer programming.

    PubMed

    Alvarado, Michelle; Ntaimo, Lewis

    2016-09-16

    Oncology clinics are often burdened with scheduling large volumes of cancer patients for chemotherapy treatments under limited resources such as the number of nurses and chairs. These cancer patients require a series of appointments over several weeks or months and the timing of these appointments is critical to the treatment's effectiveness. Additionally, the appointment duration, the acuity levels of each appointment, and the availability of clinic nurses are uncertain. The timing constraints, stochastic parameters, rising treatment costs, and increased demand of outpatient oncology clinic services motivate the need for efficient appointment schedules and clinic operations. In this paper, we develop three mean-risk stochastic integer programming (SIP) models, referred to as SIP-CHEMO, for the problem of scheduling individual chemotherapy patient appointments and resources. These mean-risk models are presented and an algorithm is devised to improve computational speed. Computational results were conducted using a simulation model and results indicate that the risk-averse SIP-CHEMO model with the expected excess mean-risk measure can decrease patient waiting times and nurse overtime when compared to deterministic scheduling algorithms by 42 % and 27 %, respectively.

  2. 2012 Gordon Research Conference on Microbial Stress Response, Schedule and Speaker/Poster Program

    SciTech Connect

    Donohue, Timothy J.

    2012-07-20

    The Gordon Research Conference on Microbial Stress Response was held at Mount Holyoke College, South Hadley, Massachusetts, July 15-20, 2012. The Conference was well-attended with 180 participants. The 2012 Microbial Stress Responses Gordon Research Conference will provide a forum for the open reporting of recent discoveries on the diverse mechanisms employed by microbes to respond to stress. Approaches range from analysis at the molecular level (how are signals perceived and transmitted to change gene expression or function) to cellular and microbial community responses. Attached is a copy of the formal schedule and speaker program and the poster program.

  3. The JUPITER-III Program: ANL analysis of ZPPR-17

    SciTech Connect

    Brumbach, S.B.; Collins, P.J.; Grasseschi, G.L.; Schaefer, R.W.; Brumbach, S.B.; Collins, P.J.; Grasseschi, G.L.; Schaefer, R.W.

    1989-01-31

    The ZPPR-17 assembly was part of the JUPITER-III cooperative program between the US DOE and PNC of Japan. The assembly was designed to study the neutronic behavior of a large, axially heterogeneous, liquid-metal-cooled reactor. The unique feature of the assembly was an internal blanket region in the axial center of the core extending two-thirds of the core radius. Assembly variants with 25 control rod positions and with 13 half-inserted control rods were built. This report describes in detail the results of measurements and analyses of ZPPR-17. The measurements emphasized reaction rate distributions, and gamma dose measurements were included. Additional measurements were control worth, sodium void worth, and reactivity coefficients associated with small material motions in assembly expansion and bowing.

  4. Impact of two scheduling systems on early enrollment in a group prenatal care program.

    PubMed

    Hackley, Barbara; Applebaum, Jo; Wilcox, Wendy C; Arevalo, Sandra

    2009-01-01

    Group care is an effective approach to prenatal care. Yet difficulties in recruiting, enrolling, and scheduling women into group care present obstacles to optimal program delivery. The purpose of this study was to determine whether the use of a scheduling system based on women's estimated date of delivery (EDD) decreased gestational age at entry to group care, increased attendance, and improved continuity of care. A total of 13 groups were held; seven groups used a scheduling system based on appointment availability and six groups used a scheduling system based on women's EDD. Compared with the availability-based scheduling system, the EDD-based system decreased mean gestational age (23.2 vs. 21.8 weeks; P = .058) and significantly decreased mean maximum gestational age (31.0 vs. 26.3 weeks; P = .002) at entry to group care. The EDD-based system increased the mean number of sessions offered per group (6.7 vs. 8.2 sessions; P < .001); however, attendance rates were similar across systems. The EDD-based system also increased the percentage of women who had the same initial visit and group provider (78.0% vs. 85.5%; P = .303). The use of this system by other health care facilities could ease the task of enrolling a sufficient number of participants into group care, minimize the need for women to change care providers if they desire group care, and allow more time for educational activities and the development of social networks for women by offering more sessions per group.

  5. DSIF station schedules

    NASA Technical Reports Server (NTRS)

    Flarity, L. D.; Hanson, R. J.; Thom, E. H.

    1971-01-01

    System manages Deep Space Instrumentation Facilities /DSIF/ equipment construction and modification planning. Versatile program applies to such tasks as employee time and task schedules, pay schedules, operations schedules, and plant and equipment procurement, construction, modification or service.

  6. A Comparison of Earned Value Management and Earned Schedule as Schedule Predictors on DoD ACAT I Programs

    DTIC Science & Technology

    2013-03-01

    introduced in its current form to the agencies of the U.S. government in 1967 as the Cost/Schedule Control Systems Criteria (C/SCSC). EVM has been...It is most effective for a project with “interdependent activities” and is “commonly used with all forms of projects, including construction...used ES in some capacity: some used it as a primary form of schedule analysis, while others used it primarily as an “indicator.” ESC analysts who

  7. Integrating an HTLV-III Screening Program into a Community Based Family Health Service Agency.

    ERIC Educational Resources Information Center

    Klausmeier, Walter W.; Henshaw, Beverly

    Acquired Immune Deficiency Syndrome (AIDS) has become one of the most serious epidemic disease problems in recent years. In 1985 the Public Health Service recommended establishment of test sites where individuals might be tested for Human T Lymphotropic Virus III (HTLV-III) antibody. An HTLV-III antibody screening program was integrated into a…

  8. The Swift Project Contamination Control Program: A Case study of Balancing Cost, Schedule and Risk

    NASA Technical Reports Server (NTRS)

    Hansen, Patricia A.; Day, Diane; Secunda, Mark

    2003-01-01

    The Swift Observatory will be launched in early 2004 to examine the dynamic process of gamma ray burst (GRB) events. The multi-wavelength Observatory will study the GRB afterglow characteristics, which will help to answer fundamental questions about both the structure and the evolution of the universe. The Swift Observatory Contamination Control Program has been developed to aid in ensuring the success of the on-orbit performance of two of the primary instruments: the Ultraviolet and Optical Telescope (UVOT) and the X-Ray Telescope (XRT). During the design phase of the Observatory, the contamination control program evolved and trade studies were performed to assess the risk of contaminating the sensitive UVOT and XRT optics during both pre-launch testing and on-orbit operations, within the constraints of the overall program cost and schedule.

  9. The Swift Project Contamination Control Program: A Case Study of Balancing Cost, Schedule and Risk

    NASA Technical Reports Server (NTRS)

    Hansen, Patricia A.; Day, Diane T.; Secunda, Mark S.; Rosecrans, Glenn P.

    2004-01-01

    The Swift Observatory will be launched in early 2004 to examine the dynamic process of gamma ray burst (GRB) events. The multi-wavelength Observatory will study the GRB afterglow characteristics, which will help to answer fundamental questions about both the structure and the evolution of the universe. The Swift Observatory Contamination Control Program has been developed to aid in ensuring the success of the on-orbit performance of two of the primary instruments: the Ultraviolet and Optical Telescope (UVOT) and the X-Ray Telescope (XRT). During the design phase of the Observatory, the contamination control program evolved and trade studies were performed to assess the risk of contaminating the sensitive UVOT and XRT optics during both pre-launch testing and on-orbit operations, within the constraints of the overall program cost and schedule.

  10. Prioritized schedule for review of industrial safety and occupational health programs

    SciTech Connect

    1996-12-01

    This document provides the rationale and criteria for developing a schedule for reviewing the Industrial Safety and Occupational Health programs for the Management and Operating Contractor (MOC) of the Waste Isolation Pilot Plant. The reviews will evaluate the MOC`s compliance with applicable Department of Energy (DOE) orders and regulatory requirements. The scope of this task includes developing prioritization criteria, determining the review priority of each program based upon the criteria, identifying review requirements for each program, and preparing a detailed review schedule. In keeping with the Carlsbad Area Office (CAO) structure for the review of site activities, these review activities will be addressed as surveillances, although the original basis for this requirement refers to these activities as appraisals. Surveillances and appraisals are the same within this document. Surveillances are defined as: ``The act of monitoring or observing to verify whether an item, activity, system, or process conforms to specified requirements. Surveillance of a technical work activity is normally done in real time, i.e., the surveillance is accomplished as the work is being performed.``

  11. Fuzzy linear programming based optimal fuel scheduling incorporating blending/transloading facilities

    SciTech Connect

    Djukanovic, M.; Babic, B.; Milosevic, B.; Sobajic, D.J.; Pao, Y.H. |

    1996-05-01

    In this paper the blending/transloading facilities are modeled using an interactive fuzzy linear programming (FLP), in order to allow the decision-maker to solve the problem of uncertainty of input information within the fuel scheduling optimization. An interactive decision-making process is formulated in which decision-maker can learn to recognize good solutions by considering all possibilities of fuzziness. The application of the fuzzy formulation is accompanied by a careful examination of the definition of fuzziness, appropriateness of the membership function and interpretation of results. The proposed concept provides a decision support system with integration-oriented features, whereby the decision-maker can learn to recognize the relative importance of factors in the specific domain of optimal fuel scheduling (OFS) problem. The formulation of a fuzzy linear programming problem to obtain a reasonable nonfuzzy solution under consideration of the ambiguity of parameters, represented by fuzzy numbers, is introduced. An additional advantage of the FLP formulation is its ability to deal with multi-objective problems.

  12. A Mixed Integer Linear Program for Solving a Multiple Route Taxi Scheduling Problem

    NASA Technical Reports Server (NTRS)

    Montoya, Justin Vincent; Wood, Zachary Paul; Rathinam, Sivakumar; Malik, Waqar Ahmad

    2010-01-01

    Aircraft movements on taxiways at busy airports often create bottlenecks. This paper introduces a mixed integer linear program to solve a Multiple Route Aircraft Taxi Scheduling Problem. The outputs of the model are in the form of optimal taxi schedules, which include routing decisions for taxiing aircraft. The model extends an existing single route formulation to include routing decisions. An efficient comparison framework compares the multi-route formulation and the single route formulation. The multi-route model is exercised for east side airport surface traffic at Dallas/Fort Worth International Airport to determine if any arrival taxi time savings can be achieved by allowing arrivals to have two taxi routes: a route that crosses an active departure runway and a perimeter route that avoids the crossing. Results indicate that the multi-route formulation yields reduced arrival taxi times over the single route formulation only when a perimeter taxiway is used. In conditions where the departure aircraft are given an optimal and fixed takeoff sequence, accumulative arrival taxi time savings in the multi-route formulation can be as high as 3.6 hours more than the single route formulation. If the departure sequence is not optimal, the multi-route formulation results in less taxi time savings made over the single route formulation, but the average arrival taxi time is significantly decreased.

  13. QoS Differential Scheduling in Cognitive-Radio-Based Smart Grid Networks: An Adaptive Dynamic Programming Approach.

    PubMed

    Yu, Rong; Zhong, Weifeng; Xie, Shengli; Zhang, Yan; Zhang, Yun

    2016-02-01

    As the next-generation power grid, smart grid will be integrated with a variety of novel communication technologies to support the explosive data traffic and the diverse requirements of quality of service (QoS). Cognitive radio (CR), which has the favorable ability to improve the spectrum utilization, provides an efficient and reliable solution for smart grid communications networks. In this paper, we study the QoS differential scheduling problem in the CR-based smart grid communications networks. The scheduler is responsible for managing the spectrum resources and arranging the data transmissions of smart grid users (SGUs). To guarantee the differential QoS, the SGUs are assigned to have different priorities according to their roles and their current situations in the smart grid. Based on the QoS-aware priority policy, the scheduler adjusts the channels allocation to minimize the transmission delay of SGUs. The entire transmission scheduling problem is formulated as a semi-Markov decision process and solved by the methodology of adaptive dynamic programming. A heuristic dynamic programming (HDP) architecture is established for the scheduling problem. By the online network training, the HDP can learn from the activities of primary users and SGUs, and adjust the scheduling decision to achieve the purpose of transmission delay minimization. Simulation results illustrate that the proposed priority policy ensures the low transmission delay of high priority SGUs. In addition, the emergency data transmission delay is also reduced to a significantly low level, guaranteeing the differential QoS in smart grid.

  14. Predicting Schedule Duration for Defense Acquisition Programs: Program Initiation to Initial Operational Capability

    DTIC Science & Technology

    2016-03-24

    months for defense acquisition programs from program initiation, which is the start of Engineering and Manufacturing Development (EMD), to Initial...multiple regression model that provides an output value in months . For the purpose of this study, the output from the multiple regression analysis...encompasses overall time duration in months , starting at MS-B, through EMD, P&D, Low-Rate Initial Production (LRIP), and Initial Operational Test and

  15. Issues in NASA Program and Project Management: Focus on Project Planning and Scheduling

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics addressed include: Planning and scheduling training for working project teams at NASA, overview of project planning and scheduling workshops, project planning at NASA, new approaches to systems engineering, software reliability assessment, and software reuse in wind tunnel control systems.

  16. A methodology for the evaluation of program cost and schedule risk for the SEASAT program

    NASA Technical Reports Server (NTRS)

    Abram, P.; Myers, D.

    1976-01-01

    An interactive computerized project management software package (RISKNET) is designed to analyze the effect of the risk involved in each specific activity on the results of the total SEASAT-A program. Both the time and the cost of each distinct activity can be modeled with an uncertainty interval so as to provide the project manager with not only the expected time and cost for the completion of the total program, but also with the expected range of costs corresponding to any desired level of significance. The nature of the SEASAT-A program is described. The capabilities of RISKNET and the implementation plan of a RISKNET analysis for the development of SEASAT-A are presented.

  17. 25 CFR 36.12 - Standard III-Program needs assessment.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Program Evaluation. This assessment shall include at least the following: (a) A clear statement of student... data developed as a result of the evaluation outlined in § 36.50 School Program Evaluation. (c) A... 25 Indians 1 2013-04-01 2013-04-01 false Standard III-Program needs assessment. 36.12 Section...

  18. 25 CFR 36.12 - Standard III-Program needs assessment.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Program Evaluation. This assessment shall include at least the following: (a) A clear statement of student... data developed as a result of the evaluation outlined in § 36.50 School Program Evaluation. (c) A... 25 Indians 1 2011-04-01 2011-04-01 false Standard III-Program needs assessment. 36.12 Section...

  19. 25 CFR 36.12 - Standard III-Program needs assessment.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Program Evaluation. This assessment shall include at least the following: (a) A clear statement of student... data developed as a result of the evaluation outlined in § 36.50 School Program Evaluation. (c) A... 25 Indians 1 2012-04-01 2011-04-01 true Standard III-Program needs assessment. 36.12 Section...

  20. SELENIUM TREATMENT/REMOVAL ALTERNATIVES DEMONSTRATION PROJECT - MINE WASTE TECHNOLOGY PROGRAM ACTIVITY III, PROJECT 20

    EPA Science Inventory

    This document is the final report for EPA's Mine WAste Technology Program (MWTP) Activity III, Project 20--Selenium Treatment/Removal Alternatives Demonstration project. Selenium contamination originates from many sources including mining operations, mineral processing, abandoned...

  1. BASIC Simulation Programs; Volumes III and IV. Mathematics, Physics.

    ERIC Educational Resources Information Center

    Digital Equipment Corp., Maynard, MA.

    The computer programs presented here were developed as a part of the Huntington Computer Project. They were tested on a Digital Equipment Corporation TSS-8 time-shared computer and run in a version of BASIC. Mathematics and physics programs are presented in this volume. The 20 mathematics programs include ones which review multiplication skills;…

  2. 78 FR 48995 - Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule, DME Face-to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-12

    ...This document corrects technical errors that appeared in the final rule with comment period published in the Federal Register on November 16, 2012, entitled ``Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule, DME Face-to-Face Encounters, Elimination of the Requirement for Termination of Non-Random Prepayment Complex Medical Review and Other Revisions to Part B......

  3. 10 CFR Appendix D to Part 73 - Physical Protection of Irradiated Reactor Fuel in Transit, Training Program Subject Schedule

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Physical Protection of Irradiated Reactor Fuel in Transit... Irradiated Reactor Fuel in Transit, Training Program Subject Schedule Pursuant to the provision of § 73.37 of... reactor fuel is required to assure that individuals used as shipment escorts have completed a...

  4. 10 CFR Appendix D to Part 73 - Physical Protection of Irradiated Reactor Fuel in Transit, Training Program Subject Schedule

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Physical Protection of Irradiated Reactor Fuel in Transit... Irradiated Reactor Fuel in Transit, Training Program Subject Schedule Pursuant to the provision of § 73.37 of... reactor fuel is required to assure that individuals used as shipment escorts have completed a...

  5. Microcomputerizing Your Paperwork. Part III: Financial Management Programs.

    ERIC Educational Resources Information Center

    Pogrow, Stanley

    1982-01-01

    Examines computerized financial accounting programs that can help administrators with the management of school finances. A detailed chart of financial accounting software packages for microcomputers is included. (JJD)

  6. 2012 Gordon Research Conference on Rock Deformation - Formal Schedule and Speaker/Poster Program

    SciTech Connect

    Kelemen, Peter

    2012-08-24

    The Gordon Research Conference on ROCK DEFORMATION was held at Proctor Academy Andover, New Hampshire, August 19-24, 2012. The Conference was well-attended with 124 participants (attendees list attached). The attendees represented the spectrum of endeavor in this field coming from academia, industry, and government laboratories, both U.S. and foreign scientists, senior researchers, young investigators, and students. Of the 124 attendees, 66 voluntarily responded to a general inquiry regarding ethnicity which appears on our registration forms. Of the 66 respondents, 8% were Minorities – 2% Hispanic, 6% Asian and 0% African American. Approximately 27% of the participants at the 2012 meeting were women. In designing the formal speakers program, emphasis was placed on current unpublished research and discussion of the future target areas in this field. There was a conscious effort to stimulate lively discussion about the key issues in the field today. Time for formal presentations was limited in the interest of group discussions. In order that more scientists could communicate their most recent results, poster presentation time was scheduled. Attached is a copy of the formal schedule and speaker program and the poster program. In addition to these formal interactions, "free time" was scheduled to allow informal discussions. Such discussions are fostering new collaborations and joint efforts in the field. Feedback processes are vitally important in controlling the rates and mechanisms of rock deformation. Positive feedbacks lead to accelerating rates, and commonly to spatial focusing. Localization and acceleration of creep is often associated with stress and/or strain rate dependent grain size reduction, frictional heating, or viscous shear heating. The presence of melt may help to localize and accelerate deformation, and in turn deformation may help to localize melt transport. Volume changes during retrograde metamorphic reactions may, under some circumstances, lead

  7. Aspects of job scheduling

    NASA Technical Reports Server (NTRS)

    Phillips, K.

    1976-01-01

    A mathematical model for job scheduling in a specified context is presented. The model uses both linear programming and combinatorial methods. While designed with a view toward optimization of scheduling of facility and plant operations at the Deep Space Communications Complex, the context is sufficiently general to be widely applicable. The general scheduling problem including options for scheduling objectives is discussed and fundamental parameters identified. Mathematical algorithms for partitioning problems germane to scheduling are presented.

  8. Scheduling Nonconsumable Resources

    NASA Technical Reports Server (NTRS)

    Porta, Harry J.

    1990-01-01

    Users manual describes computer program SWITCH that schedules use of resources - by appliances switched on and off and use resources while they are on. Plans schedules according to predetermined goals; revises schedules when new goals imposed. Program works by depth-first searching with strict chronological back-tracking. Proceeds to evaluate alternatives as necessary, sometimes interacting with user.

  9. Programs for Infants and Young Children. Part III: Health.

    ERIC Educational Resources Information Center

    Appalachian Regional Commission, Washington, DC.

    Directed toward the improvement of health care for mothers and young children, this report describes a number of comprehensive programs focused on health and reports on projects which have singled out one or more specific maternal or child health services. Included are descriptions of existing community programs for pregnant schoolgirls, health…

  10. GRAPH III: a digitizing and graph plotting program

    SciTech Connect

    Selleck, C.B.

    1986-03-01

    GRAPH is an interactive program that allows the user to perform two functions. The first is to plot two dimensional graphs and the second is to digitize graphs or plots to create data files of points. The program is designed to allow the user to get results quickly and easily. It is written in RATIV (a FORTRAN preprocessor) and is currently in use at Sandia under VMS on a VAX computer and CTSS on a Cray supercomputer. The program provides graphical output through all of the Sandia Virtual Device Interface (VDI) graphics devices. 2 refs., 3 figs., 3 tabs.

  11. 25 CFR 36.12 - Standard III-Program needs assessment.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Standard III-Program needs assessment. 36.12 Section 36... Management § 36.12 Standard III—Program needs assessment. The policy and procedures of each school and its curricula shall be developed and revised based on an assessment of educational needs. This needs...

  12. A Second Year Evaluation of the ESEA Title III Urban Leadership Program.

    ERIC Educational Resources Information Center

    Frerichs, Allen H.

    The Urban Leadership Program, funded under Title III of the Elementary and Secondary Education Act, was carried out among sixth graders at the Albert Einstein School in Chicago, Illinois. The primary purpose of the program was to develop skills and competence to prepare participants for survival and success in a large urban environment. A…

  13. Ada Integrated Environment III Computer Program Development Specification. Volume III. Ada Optimizing Compiler.

    DTIC Science & Technology

    1981-12-01

    Corporation , Order No. GY28-6800-5 (December 1971). [IBM72] FORTRAN IV (H) Compiler Program Logic Manual, IBM Corporation , Order No. GH28-6642-5...RAVC ptans6 and excutes~ ’Leseatc, devetopment, .te,~t and 4etected acquisition p)LopLamn in -sappo~~t o6 Command, Con-tt Commnications ~ and

  14. DOE-EPRI distributed wind Turbine Verification Program (TVP III)

    SciTech Connect

    McGowin, C.; DeMeo, E.; Calvert, S.

    1997-12-31

    In 1992, the Electric Power Research Institute (EPRI) and the U.S. Department of Energy (DOE) initiated the Utility Wind Turbine Verification Program (TVP). The goal of the program is to evaluate prototype advanced wind turbines at several sites developed by U.S. electric utility companies. Two six MW wind projects have been installed under the TVP program by Central and South West Services in Fort Davis, Texas and Green Mountain Power Corporation in Searsburg, Vermont. In early 1997, DOE and EPRI selected five more utility projects to evaluate distributed wind generation using smaller {open_quotes}clusters{close_quotes} of wind turbines connected directly to the electricity distribution system. This paper presents an overview of the objectives, scope, and status of the EPRI-DOE TVP program and the existing and planned TVP projects.

  15. 78 FR 74229 - Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule, Clinical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-10

    ...This major final rule with comment period addresses changes to the physician fee schedule, clinical laboratory fee schedule, and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. This final rule with comment period also includes a discussion in the Supplementary Information regarding......

  16. School Bus Routing and Scheduling: When to Use Computer-Assisted Methods and Programs.

    ERIC Educational Resources Information Center

    Walcott, Wayne; And Others

    1986-01-01

    Discusses issues concerning the use of computers in school bus scheduling and routing. Examines the advantages, technical considerations, and costs of changing to a computerized system. Offers a five-point approach toward implementation and includes a table of comparative data for routing and scheduling models for a typical school bus fleet. (IW)

  17. SWOG S0221: A Phase III Trial Comparing Chemotherapy Schedules in High-Risk Early-Stage Breast Cancer

    PubMed Central

    Budd, George T.; Barlow, William E.; Moore, Halle C.F.; Hobday, Timothy J.; Stewart, James A.; Isaacs, Claudine; Salim, Muhammad; Cho, Jonathan K.; Rinn, Kristine J.; Albain, Kathy S.; Chew, Helen K.; Burton, Gary V.; Moore, Timothy D.; Srkalovic, Gordan; McGregor, Bradley A.; Flaherty, Lawrence E.; Livingston, Robert B.; Lew, Danika L.; Gralow, Julie R.; Hortobagyi, Gabriel N.

    2015-01-01

    Purpose To determine the optimal dose and schedule of anthracycline and taxane administration as adjuvant therapy for early-stage breast cancer. Patients and Methods A 2 × 2 factorial design was used to test two hypotheses: (1) that a novel continuous schedule of doxorubicin-cyclophosphamide was superior to six cycles of doxorubicin-cyclophosphamide once every 2 weeks and (2) that paclitaxel once per week was superior to six cycles of paclitaxel once every 2 weeks in patients with node-positive or high-risk node-negative early-stage breast cancer. With 3,250 patients, a disease-free survival (DFS) hazard ratio of 0.82 for each randomization could be detected with 90% power with two-sided α = .05. Overall survival (OS) was a secondary outcome. Results Interim analyses crossed the futility boundaries for demonstrating superiority of both once-per-week regimens and once-every-2-weeks regimens. After a median follow-up of 6 years, a significant interaction developed between the two randomization factors (DFS P = .024; OS P = .010) in the 2,716 patients randomly assigned in the original design, which precluded interpretation of the two factors separately. Comparing all four arms showed a significant difference in OS (P = .040) but not in DFS (P = .11), with all treatments given once every 2 weeks associated with the highest OS. This difference in OS seemed confined to patients with hormone receptor–negative/human epidermal growth factor receptor 2 (HER2) –negative tumors (P = .067), with no differences seen with hormone receptor–positive/HER2-negative (P = .90) or HER2-positive tumors (P = .40). Conclusion Patients achieved a similar DFS with any of these regimens. Subset analysis suggests the hypothesis that once-every-2-weeks dosing may be best for patients with hormone receptor–negative/HER2-negative tumors. PMID:25422488

  18. Hawaii Integrated Biofuels Research Program: Final Subcontract Report, Phase III

    SciTech Connect

    Not Available

    1992-05-01

    This report is a compilation of studies done to develop an integrated set of strategies for the production of energy from renewable resources in Hawaii. Because of the close coordination between this program and other ongoing DOE research, the work will have broad-based applicability to the entire United States.

  19. Evaluation Report III: The Robert Noyce Scholarship Program at CSUB

    ERIC Educational Resources Information Center

    Wang, Jianjun

    2013-01-01

    California State University, Bakersfield (CSUB) received funding from National Science Foundation's (NSF) Robert Noyce Teacher Scholarship Program to recruit Noyce Scholars from upper-division science, technology, engineering, and mathematics (STEM) majors, graduate students, and professionals switched to STEM teaching from other fields (NSF…

  20. Medicare program; schedule of limits on home health agency costs per visit for cost reporting periods beginning on or after July 1, 1991--HCFA. Notice with comment period.

    PubMed

    1991-12-09

    This notice sets forth a revised schedule of limits on home health agency costs that may be paid under the Medicare program. This revised schedule of limits applies to cost reporting periods beginning on or after July 1, 1991. As required by section 4207(d) of the Omnibus Budget Reconciliation Act of 1990 (Pub. L. 101-508), this revised schedule of limits incorporates a blended hospital wage index.

  1. Does the benefits schedule of cash assistance programs affect the purchase of temptation goods? Evidence from Peru.

    PubMed

    White, Justin S; Basu, Sanjay

    2016-03-01

    A critique of cash assistance programs is that beneficiaries may spend the money on "temptation goods" such as alcohol and tobacco. We exploit a change in the payment schedule of Peru's conditional cash transfer program to identify the impact of benefit receipt frequency on the purchase of temptation goods. We use annual household data among cross-sectional and panel samples to analyze the effect of the policy change on the share of the household budget devoted to four categories of temptation goods. Using a difference-in-differences estimation approach, we find that larger, less frequent payments increased the expenditure share of alcohol by 55-80% and sweets by 10-40%, although the absolute magnitudes of these effects are small. Our study suggests that less frequent benefits scheduling may lead cash recipients to make certain types of temptation purchases.

  2. 24 CFR 8.29 - Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self-help programs). 8.29 Section 8.29...), Turnkey III and Indian housing mutual self-help programs). Any housing units newly constructed...

  3. 24 CFR 8.29 - Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self-help programs). 8.29 Section 8.29...), Turnkey III and Indian housing mutual self-help programs). Any housing units newly constructed...

  4. 24 CFR 8.29 - Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self-help programs). 8.29 Section 8.29...), Turnkey III and Indian housing mutual self-help programs). Any housing units newly constructed...

  5. 24 CFR 8.29 - Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self-help programs). 8.29 Section 8.29...), Turnkey III and Indian housing mutual self-help programs). Any housing units newly constructed...

  6. 40 CFR 147.1801 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CONTROL PROGRAMS Ohio § 147.1801 State-administered program—Class I, III, IV and V wells. The UIC program for Class I, III, IV, and V wells in the State of Ohio, other than those on Indian lands, is the program administered by the Ohio Department of Natural Resources and the Ohio Environmental...

  7. 40 CFR 147.1250 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CONTROL PROGRAMS Mississippi § 147.1250 State-administered program—Class I, III, IV, and V wells. The UIC program for Class I, III, IV and V wells in the State of Mississippi, except those on Indian lands, is the program administered by the Mississippi Department of Natural Resources approved by EPA pursuant...

  8. 40 CFR 147.1250 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... CONTROL PROGRAMS Mississippi § 147.1250 State-administered program—Class I, III, IV, and V wells. The UIC program for Class I, III, IV and V wells in the State of Mississippi, except those on Indian lands, is the program administered by the Mississippi Department of Natural Resources approved by EPA pursuant...

  9. 40 CFR 147.1250 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... CONTROL PROGRAMS Mississippi § 147.1250 State-administered program—Class I, III, IV, and V wells. The UIC program for Class I, III, IV and V wells in the State of Mississippi, except those on Indian lands, is the program administered by the Mississippi Department of Natural Resources approved by EPA pursuant...

  10. 40 CFR 147.1250 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... CONTROL PROGRAMS Mississippi § 147.1250 State-administered program—Class I, III, IV, and V wells. The UIC program for Class I, III, IV and V wells in the State of Mississippi, except those on Indian lands, is the program administered by the Mississippi Department of Natural Resources approved by EPA pursuant...

  11. 40 CFR 147.1250 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... CONTROL PROGRAMS Mississippi § 147.1250 State-administered program—Class I, III, IV, and V wells. The UIC program for Class I, III, IV and V wells in the State of Mississippi, except those on Indian lands, is the program administered by the Mississippi Department of Natural Resources approved by EPA pursuant...

  12. 40 CFR 147.500 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CONTROL PROGRAMS Florida § 147.500 State-administered program—Class I, III, IV, and V wells. The UIC program for Class I, III, IV, and V wells in the State of Florida, except for those on Indian lands is... 40 Protection of Environment 22 2010-07-01 2010-07-01 false State-administered program-Class...

  13. 40 CFR 147.850 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS Kansas § 147.850 State-administered program—Class I, III, IV and V wells. The UIC program for Class I, III, IV and V wells in the State of Kansas, except those on Indian lands as described in § 147... 40 Protection of Environment 22 2010-07-01 2010-07-01 false State-administered program-Class...

  14. 40 CFR 147.700 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... CONTROL PROGRAMS Illinois § 147.700 State-administered program—Class I, III, IV, and V wells. The UIC program for Class I, III, IV and V wells in the State of Illinois, except those on Indian lands, is the... 40 Protection of Environment 22 2010-07-01 2010-07-01 false State-administered program-Class...

  15. Development of Milestone Schedules for Selected Logistics Support Directorate Programs. Appendix A. Part 2. Task Summaries.

    DTIC Science & Technology

    1987-09-15

    0/ TIPO SCHEDULE: DV CONDUCT A PERFORMANCE DEMONSTRATION PRIOR TO TECHNICAL TEST CODE NUMBER: NONE (TT) I AND USER TEST (UT) I. RESPONSIBILITY...NONDEVELOPMENT ITEM EVALUATION PLAN CODE NUMBER: NONE (NEP) FOR MARKET SURVEY. RESPONSIBILITY: PA & T DURATION: 44.00 WORK DAYS .2 CFP COMP SCHEDULE: NDII THE...NONE BASED UPON THE MARKET SURVEY. THESE FINDINGS SERVE AS THE RESPONSIBILITY: ROY & ILS BASIS FOR THE IN-PROCESS REVIEW (IPR) DECISION TO PURSUE

  16. Bioterrorism preparedness. III: State and federal programs and response.

    PubMed

    Mothershead, Jerry L; Tonat, Kevin; Koenig, Kristi L

    2002-05-01

    Management of a bioterrorism event will begin with early detection and intervention at the local level. Any large-scale event will require rapid state and federal assistance. Federal initiatives targeting bioterrorism have increasingly become a complex web of executive and legislative actions, frequently initiated in reaction to specific events, and often unrelated to this threat. Multiple executive and legislative branch actions have resulted in a proliferation of federal programs, and coordination of these efforts remains a significant challenge. Still, great strides have been taken to improve our defensive posture against this emerging threat, and, at all levels, governmental authorities and agencies are much better prepared to respond to such events than they were a decade ago. The events of September 11, 2001 and subsequent events are clear indicators that the timeline for preparedness has been significantly compressed. Federal emergency operations, historically designed more for recovery than response, seemed up to the task in the wake of the World Trade Center and Pentagon attacks, although there was criticism of federal responsiveness to the subsequent anthrax incidents [71,72], and the timeliness of federal resources in the event of a large-scale outbreak resulting from a bioterrorism attack has yet to be truly tested. The recent establishment of the Office of Homeland Security and the Homeland Security Council holds promise that some of these inefficiencies may be rectified and overall coordination of programs will improve. Continued improvements in the effectiveness of the federal government in meeting the challenges of this and other emerging threats to homeland security will require: Establishment of consensus standards, metrics, and measures of effectiveness for all aspects of disaster, epidemic, and terrorism management at the local, regional, state, and federal levels Delineation of expected, quantifiable state and local capabilities to mitigate

  17. CHAP III- CHARRING ABLATOR PROGRAM FOR ADVANCED INVESTIGATION OF THERMAL PROTECTION SYSTEMS FOR ENTRY

    NASA Technical Reports Server (NTRS)

    Stroud, C. W.

    1994-01-01

    The transient response of a thermal protection material to heat applied to the surface can be calculated using the CHAP III computer program. CHAP III can be used to analyze pyrolysis gas chemical kinetics in detail and examine pyrolysis reactions-indepth. The analysis includes the deposition of solid products produced by chemical reactions in the gas phase. CHAP III uses a modelling technique which can approximate a wide range of ablation problems. The energy equation used in CHAP III incorporates pyrolysis (both solid and gas reactions), convection, conduction, storage, work, kinetic energy, and viscous dissipation. The chemically reacting components of the solid are allowed to vary as a function of position and time. CHAP III employs a finite difference method to approximate the energy equations. Input values include specific heat, thermal conductivity, thermocouple locations, enthalpy, heating rates, and a description of the chemical reactions expected. The output tabulates the temperature at locations throughout the ablator, gas flow within the solid, density of the solid, weight of pyrolysis gases, and rate of carbon deposition. A sample case is included, which analyzes an ablator material containing several pyrolysis reactions subjected to an environment typical of entry at lunar return velocity. CHAP III is written in FORTRAN IV for batch execution and has been implemented on a CDC CYBER 170 series computer operating under NOS with a central memory requirement of approximately 102K (octal) of 60 bit words. This program was developed in 1985.

  18. Minuteman Stage III Operational Surveillance Program Seven-Year Testing Bondline Aging Study,

    DTIC Science & Technology

    1985-12-01

    Liner Gel Fraction at Various Motor Locations ......... . . 25 14 Liner Moisture at Various Motor Locations ............. ... 26 6 15 Motor TC 30005 ...PageI ,,. 18 Shore A Hardness Gradient of ANB-3066 Propellant at the Forward Equator ........ ...................... .. 30 19 Motor TC 30005 ...75 I 2 Matrix for Minuteman Stage III Bondline Aging Program ........ 76 3 Motor TC 30005 Material Properties Data, Forward

  19. Final Report: Pilot Region-Based Optimization Program for Fund-Lead Sites, EPA Region III

    EPA Pesticide Factsheets

    This report describes a pilot study for a Region-based optimization program, implemented by a Regional Optimization Evaluation Team (ROET) that was conducted in U.S. EPA Region III at Fund-lead sites with pump-and-treat (P&T) systems.

  20. Sequential Mathematics Course III. Volume One. Staff Development Program 1986-1987.

    ERIC Educational Resources Information Center

    New York City Board of Education, Brooklyn, NY. Div. of Curriculum and Instruction.

    The Sequential Mathematics Sequence provides students with an integrated course of study, including lessons which interweave algebra, geometry, logic, probability, and mathematical systems. This handbook is designed to meet the needs of teachers who will be teaching Course III in the sequence. The handbook, for use with staff development programs,…

  1. Evaluation of the ESEA Title III Program: "Educational Resources Center on the Negro Heritage." Final Report.

    ERIC Educational Resources Information Center

    Neyman, Clinton A., Jr.; Riordan, Anne M.

    The purpose of this study was to evaluate the ESEA Title III project of the African Museum of Art/Frederick Douglass Institute as conducted in the District of Columbia Public Schools. The Institute sought to further its education program to meet the increasing demand for materials, activities, and resources dealing with the cultural and historical…

  2. Oregon Small Schools Program: A Title III Project. Independent Evaluation Report.

    ERIC Educational Resources Information Center

    Educational Coordinates Northwest, Salem, OR.

    An independent evaluation report (May 1971) by Educational Coordinates Northwest, this document examines the Oregon Small Schools Program (a Title III project of the Elementary and Secondary Education Act). Three major areas were considered: the extent to which member schools implemented methodological and organizational changes, the established…

  3. [Vaccination--General concepts. Systematic vaccination schedules for the child and adult in Spain. Impact of vaccination programs].

    PubMed

    Arrazola Martínez, M Pilar; de Juanes Pardo, José Ramón; García de Codes Ilario, Aurelia

    2015-01-01

    One area of major importance in promoting health is the prevention of infectious diseases through vaccination. Vaccine is any preparation intended to generate immunity against a disease by stimulating the production of antibodies. There are two basic types: live attenuated and inactivated, with different characteristics that determine their use. The main properties of a vaccine are safety and protective efficacy. The vaccines can be administered based on individualized directions depending on various factors (personal, environmental…), or systematically as part of the immunization schedules. In Spain, the first childhood immunization schedule was implemented in 1975. The Autonomous Communities are currently responsible for establishing vaccine recommendations. The incidence of vaccine-preventable diseases and vaccination coverage are essential criteria for the evaluation of vaccination programs. In Spain the incidence of vaccine-preventable diseases is low. Vaccination coverage is high in childhood, but in adolescents, adults and groups at risk it is not always appropriate.

  4. The National Heart, Lung, and Blood Institute Recipient Epidemiology and Donor Evaluation Study (REDS-III): A research program striving to improve blood donor and transfusion recipient outcomes

    PubMed Central

    Kleinman, Steven; Busch, Michael P; Murphy, Edward L; Shan, Hua; Ness, Paul; Glynn, Simone A.

    2014-01-01

    Background The Recipient Epidemiology and Donor Evaluation Study -III (REDS-III) is a 7-year multicenter transfusion safety research initiative launched in 2011 by the National Heart, Lung, and Blood Institute. Study design The domestic component involves 4 blood centers, 12 hospitals, a data coordinating center, and a central laboratory. The international component consists of distinct programs in Brazil, China, and South Africa which involve US and in-country investigators. Results REDS-III is using two major methods to address key research priorities in blood banking/transfusion medicine. First, there will be numerous analyses of large “core” databases; the international programs have each constructed a donor/donation database while the domestic program has established a detailed research database that links data from blood donors and their donations, the components made from these donations, and data extracts from the electronic medical records of the recipients of these components. Secondly, there are more than 25 focused research protocols involving transfusion recipients, blood donors, or both that are either in progress or scheduled to begin within the next 3 years. Areas of study include transfusion epidemiology and blood utilization; transfusion outcomes; non-infectious transfusion risks; HIV-related safety issues (particularly in the international programs); emerging infectious agents; blood component quality; donor health and safety; and other donor issues. Conclusions It is intended that REDS-III serve as an impetus for more widespread recipient and linked donor-recipient research in the US as well as to help assure a safe and available blood supply in the US and in international locations. PMID:24188564

  5. Content Analysis Schedule for Bilingual Education Programs: BICEP Intercambio de la Cultura.

    ERIC Educational Resources Information Center

    Shore, Marietta Saravia; Nafus, Charles

    This content analysis schedule for BICEP Intercambio de la Cultura (San Bernardino, California), presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the…

  6. Space Shuttle 1976 into mainstream development - Program commitments on schedule to insure careful progress

    NASA Technical Reports Server (NTRS)

    Malkin, M. S.

    1976-01-01

    A progress report is given on various systems, noting conformity to schedule or changes in design. The Orbiter thermal protection system, the Space Shuttle main engine, the intertank for the structural test article (STA), thrust vector control systems, the Kennedy Space Center launch processing system, and Orbiters No. 1 and No. 2 are discussed.

  7. Content Analysis Schedule for Bilingual Education Programs: Programa en Dos Lenguas.

    ERIC Educational Resources Information Center

    Ludanyi, R. P.; Shore, Marietta Saravia

    This content analysis schedule for the "Programa en Dos Lenguas" of Fort Worth, Texas, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the…

  8. 78 FR 43281 - Medicare Program; Revisions to Payment Policies under the Physician Fee Schedule, Clinical...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-19

    ...This major proposed rule addresses changes to the physician fee schedule and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services, as well as changes in the...

  9. Schedule Risk Event Driven Methodology (SREDM): FY13 Army Studies Program Project Findings

    DTIC Science & Technology

    2015-01-01

    SUPPLEMENTARY NOTES 14. ABSTRACT AMSAA conducts independent schedule risk assessments to support Analysis of Alternatives (AoAs). AMSAA’s current...research topics include selecting analogous data and technical risk assessment integration. 15. SUBJECT TERMS analysis of alternatives , AMSAA...Army Materiel Systems Analysis Activity AoA - Analysis of Alternatives ATEC - Army Test and Evaluation Command BC - Bias Corrected

  10. 40 CFR 147.251 - EPA-administered program-Class I, III, IV and V wells and Indian lands.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false EPA-administered program-Class I, III, IV and V wells and Indian lands. 147.251 Section 147.251 Protection of Environment ENVIRONMENTAL... Indian lands. (a) Contents. The UIC program in the State of California for Class I, III, IV and V...

  11. 78 FR 65621 - Implementation of Title I/II Program Initiatives; Extension of Public Comment Period; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF EDUCATION Implementation of Title I/II Program Initiatives; Extension of Public Comment Period; Correction AGENCY... comment for an information collection entitled, ``Implementation of Title I/II Program...

  12. Medicare and Medicaid programs: schedules of guidelines for physical therapy and respiratory therapy services--Health Care Financing Administration. Final notice with a request for comments.

    PubMed

    1981-02-25

    This notice amends the current schedules of salary equivalency guidelines for Medicare program reimbursement for the reasonable costs of physical therapy and respiratory therapy services furnished under an arrangement with a hospital or other provider. The schedules will be used by the program's fiscal intermediaries to determine the maximum allowable cost of such services. These schedules update the schedule published on October 6, 1978 (43 FR 46377), for physical therapy services, and those published on June 3, 1980 (45 FR 37527), for respiratory therapy services. In addition, these guidelines apply to reimbursement under the Medicaid program where they have been incorporated in the State plans or where States follow the Medicare principles of reimbursement.

  13. 2012 Gordon Research Conference on Graphitic Carbon Materials, Chemistry and Physics of - Formal Schedule and Speaker/Poster Program

    SciTech Connect

    Fertig, Herbert A.

    2012-06-22

    The Gordon Research Conference on GRAPHITIC CARBON MATERIALS, CHEMISTRY AND PHYSICS OF was held at the Davidson College, Davidson, North Carolina, June 17 – 22, 2012. The Conference was well-attended with 95 participants (attendees list attached). The attendees represented the spectrum of endeavor in this field coming from academia, industry, and government laboratories, both U.S. and foreign scientists, senior researchers, young investigators, and students. Of the 95 attendees, 41 voluntarily responded to a general inquiry regarding ethnicity which appears on our registration forms. Of the 41 respondents, 49% were Minorities – 5% Hispanic, 44% Asian and 0% African American. Approximately 2% of the participants at the 2012 meeting were women. In designing the formal speakers program, emphasis was placed on current unpublished research and discussion of the future target areas in this field. There was a conscious effort to stimulate lively discussion about the key issues in the field today. Time for formal presentations was limited in the interest of group discussions. In order that more scientists could communicate their most recent results, poster presentation time was scheduled. Attached is a copy of the formal schedule and speaker program and the poster program. In addition to these formal interactions, "free time" was scheduled to allow informal discussions. Such discussions are fostering new collaborations and joint efforts in the field. Carbon materials play an extremely important role in our society. They not only constitute the largest supply of energy we use today (i.e., coal) but also are the bases of many important technologies ranging from pencils, adsorbents, and metal strengtheners, to batteries and many others. Recent studies on graphitic carbon, including fullerenes, carbon nanotubes, and graphene, have further revealed novel optical and electrical properties, making it possible to use them for new applications in renewable energy as well as

  14. 2012 Gordon Research Conference and Seminar on Atomic and Molecular Interactions - Formal Schedule and Speaker/Poster Program

    SciTech Connect

    Zwier, Timothy S.

    2012-07-20

    The Gordon Research Conference on ATOMIC & MOLECULAR INTERACTIONS was held at Stonehill College Easton, Massachusetts, July 15-20, 2012. The Conference was well-attended with 121 participants (attendees list attached). The attendees represented the spectrum of endeavor in this field coming from academia, industry, and government laboratories, both U.S. and foreign scientists, senior researchers, young investigators, and students. Of the 121 attendees, 64 voluntarily responded to a general inquiry regarding ethnicity which appears on our registration forms. Of the 64 respondents, 11% were Minorities – 2% Hispanic, 9% Asian and 0% African American. Approximately 20% of the participants at the 2012 meeting were women. The Gordon Research SEMINAR on ATOMIC & MOLECULAR INTERACTIONS was held at Stonehill College Easton, Massachusetts, July 14 - 15, 2012. The Conference was well-attended with 42 participants (attendees list attached). The attendees represented the spectrum of endeavor in this field coming from academia, industry, and government laboratories, both U.S. and foreign scientists, senior researchers, young investigators, and students. Of the 42 attendees, 20 voluntarily responded to a general inquiry regarding ethnicity which appears on our registration forms. Of the 20 respondents, 10% were Minorities – 0% Hispanic, 10% Asian and 0% African American. Approximately 29% of the participants at the 2012 meeting were women. In designing the formal speakers program, emphasis was placed on current unpublished research and discussion of the future target areas in this field. There was a conscious effort to stimulate lively discussion about the key issues in the field today. Time for formal presentations was limited in the interest of group discussions. In order that more scientists could communicate their most recent results, poster presentation time was scheduled. Attached is a copy of the formal schedule and speaker program and the poster program. In addition to

  15. The Stanford School Scheduling System.

    ERIC Educational Resources Information Center

    Stanford Univ., CA. Dept. of Industrial Engineering.

    This booklet gives a general overview of the computerized Stanford School Scheduling System (SSSS) which is designed to make scheduling less difficult for individualized programs in secondary education. Topics covered include new flexible scheduling and variable course structure designs in secondary education, the school scheduling problem,…

  16. Analysis of Schedule Determination in Software Program Development and Software Development Estimation Models

    DTIC Science & Technology

    1988-09-01

    successfully analyze the software estimation models I chose for this thesis, I first had to have access to them. I am thankful to Professor Daniel V. Ferens for...the software are not properly specified and defined, accurate schedule determination will be difficult. Walt Scacchi , in his article "Managing Software...21. Ferens, Daniel V. An Introduction to Software Para ec ost ZtintIng, Wright-Patterson AFB ON: Aix Force Institute of Technology, 1987. 22. Funch

  17. 24 CFR 8.29 - Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Homeownership programs (sections 235(i) and 235(j), Turnkey III and Indian housing mutual self-help programs). 8.29 Section 8.29... URBAN DEVELOPMENT Program Accessibility § 8.29 Homeownership programs (sections 235(i) and...

  18. Global Positioning System III (GPS III)

    DTIC Science & Technology

    2013-12-01

    Global Positioning System III ( GPS III) As of FY 2015 President’s Budget...00-00-2013 to 00-00-2013 4. TITLE AND SUBTITLE Global Positioning System III ( GPS III) 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT...Responsible Office References Program Name Global Positioning System III ( GPS III) DoD Component Air Force

  19. Medicare program; schedule of limits on home health agency costs per visit for cost reporting periods beginning on or after July 1, 1989--HCFA. Final notice.

    PubMed

    1991-03-28

    This final notice sets forth a revised schedule of limits on home health agency costs that may be paid under the Medicare program. This revised schedule of limits applies to cost reporting periods beginning on or after July 1, 1989 and before July 1, 1991. As required by section 6222 of the Omnibus Budget Reconciliation Act of 1989 (Pub. L. 101-239), the revised schedule of limits incorporates the hospital wage index in effect for cost reporting periods beginning prior to July 1, 1989.

  20. A possibilistic programming approach for the location problem of multiple cross-docks and vehicle routing scheduling under uncertainty

    NASA Astrophysics Data System (ADS)

    Meysam Mousavi, S.; Tavakkoli-Moghaddam, Reza; Jolai, Fariborz

    2013-10-01

    This article considers the design of cross-docking systems under uncertainty in a model that consists of two phases: (1) a strategic-based decision-making process for selecting the location of cross-docks to operate, and (2) an operational-based decision-making process for vehicle routing scheduling with multiple cross-docks. This logistic system contains three echelons, namely suppliers, cross-docks and retailers, in an uncertain environment. In the first phase, a new multi-period cross-dock location model is introduced to determine the minimum number of cross-docks among a set of location sites so that each retailer demand should be met. Then, in the second phase, a new vehicle routing scheduling model with multiple cross-docks is formulated in which each vehicle is able to pickup from or deliver to more than one supplier or retailer, and the pickup and delivery routes start and end at the corresponding cross-dock. This article is the first attempt to introduce an integrated model for cross-docking systems design under a fuzzy environment. To solve the presented two-phase mixed-integer programming (MIP) model, a new fuzzy mathematical programming-based possibilistic approach is used. Furthermore, experimental tests are carried out to demonstrate the effectiveness of the presented model. The computational results reveal the applicability and suitability of the developed fuzzy possibilistic two-phase model in a variety of problems in the domain of cross-docking systems.

  1. Tolerability of intensified intravenous interferon alfa-2b versus the ECOG 1684 schedule as adjuvant therapy for stage III melanoma: a randomized phase III Italian Melanoma Inter-group trial (IMI – Mel.A.) [ISRCTN75125874

    PubMed Central

    Chiarion-Sileni, Vanna; Del Bianco, Paola; Romanini, Antonella; Guida, Michele; Paccagnella, Adriano; Dalla Palma, Maurizio; Naglieri, Emanuele; Ridolfi, Ruggero; Silvestri, Barbara; Michiara, Maria; De Salvo, Gian Luca

    2006-01-01

    Background High-dose interferon alfa-2b (IFNalfa-2b), according to the ECOG 1684 schedule, is the only approved adjuvant treatment for stage III melanoma patients by the FDA and EMEA. However, the risk/benefit profile has been questioned limiting its world-wide use. In the late nineties, the Italian Melanoma Inter-group started a spontaneous randomized clinical trial (RCT) to verify if a more intense, but shorter than the ECOG 1684 regimen, could improve survival without increasing the toxicity profile. The safety analysis in the first 169 patients who completed the treatment is here described. Methods Stage III melanoma patients were randomized to receive IFNalfa-2b 20 MU/m2/d intravenously (IV) 5 days/week × 4 weeks, repeated for three times on weeks 9 to 12, 17 to 20, 25 to 28 (Dose-Dense/Dose-Intense, DD/DI, arm), or IFNalfa-2b 20 MU/m2/d IV 5 days/week × 4 weeks followed by 10 MU/m2 subcutaneously (SC) three times per week × 48 weeks (High Dose Interferon, HDI, arm). Toxicity was recorded and graded, according to the WHO criteria, as the worst grade that occurred during each cycle. Results The most common toxicities in both arms were flu-like and gastrointestinal symptoms, leukopenia, liver and neuro-psichiatric morbidities; with regard to severe toxicity, only leukopenia was statistically more frequent in DD/DI arm than in HDI arm (24% vs 9%) (p = 0.0074), yet, this did not cause an increase in the infection risk. Discontinuation of treatment, due to toxicity, was observed in 13 and 17% of the patients in the DD/DI and HDI arm, respectively. The median actual dose intensity delivered in the DD/DI arm (36.4 MU/m2/week) was statistically higher than that delivered in the HDI arm (30.7 MU/m2/week) (p = 0.003). Conclusion Four cycles of intravenous high-dose IFNalfa-2b can be safely delivered with an increase in the median dose intensity. Efficacy results from this trial are eagerly awaited. PMID:16504154

  2. Priorities and allocations support for energy: keeping energy programs on schedule

    SciTech Connect

    Not Available

    1985-08-01

    This publication has covered DOE and DOC procedures related to an application for rating authority for an energy program, the DPAS (Defense Priorities and Allocations System) and the Special Priorities Assistance Program's relation to priorities and allocations for energy programs. A person engaged in an eligible energy program or project must be familiar with DPAS rules, regulations and procedures. There are important benefits to be gained by the Government and the energy industry through the proper use of the priorities and allocations system.

  3. Phase III Program Study Report. Evaluation of the Child and Family Resource Program (CFRP).

    ERIC Educational Resources Information Center

    Johnson, Lynell; and Others

    Fourth in a series of Child and Family Resource Program (CFRP) evaluation reports, this document is devoted to the program study component, designed to illustrate CFRP operations across the country and to establish a descriptive context for statistical and analytic findings. Chapter 1 describes the process of building a network of linkages with…

  4. 40 CFR 147.2550 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 23 2014-07-01 2014-07-01 false State-administered program-Class I, III, IV and V wells. 147.2550 Section 147.2550 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION CONTROL PROGRAMS Wyoming §...

  5. Integrated Campaign Probabilistic Cost, Schedule, Performance, and Value for Program Office Support

    NASA Technical Reports Server (NTRS)

    Cornelius, David; Sasamoto, Washito; Daugherty, Kevin; Deacon, Shaun

    2012-01-01

    This paper describes an integrated assessment tool developed at NASA Langley Research Center that incorporates probabilistic analysis of life cycle cost, schedule, launch performance, on-orbit performance, and value across a series of planned space-based missions, or campaign. Originally designed as an aid in planning the execution of missions to accomplish the National Research Council 2007 Earth Science Decadal Survey, it utilizes Monte Carlo simulation of a series of space missions for assessment of resource requirements and expected return on investment. Interactions between simulated missions are incorporated, such as competition for launch site manifest, to capture unexpected and non-linear system behaviors. A novel value model is utilized to provide an assessment of the probabilistic return on investment. A demonstration case is discussed to illustrate the tool utility.

  6. G-III Precision Autopilot Development in Support of UAVSAR Program

    NASA Technical Reports Server (NTRS)

    Lee, James

    2007-01-01

    The primary objective of the UAVSAR Project is to develop a miniaturized polarimetric L-band synthetic aperture radar (SAR) for use on an unmanned aerial vehicle (UAV) or minimally piloted vehicle. This viewgraph presentation reviews NASA Dryden's role in the UAVSAR program. The G-III aircraft is described and shown, as well as a high level system architecture. The goals of the Platform Precision Autopilot (PPA) that it are shall fly the G-III within a 10 m (32.8 ft) diameter tube for at least 90% of each data take in conditions of calm to light atmospheric disturbances, as defined in MIL-STD-1797. That it minimize motion during data collection. It is critical to operate the UAVSAR System on a steady platform.

  7. G-III Precision Autopilot Development in Support of UAVSAR Program

    NASA Technical Reports Server (NTRS)

    Lee, James; Strovers, Brian; Lin, Victor

    2007-01-01

    This viewgraph presentation reviews NASA Dryden's role in the UAVSAR Program. The primary objective of the UAVSAR Project is to develop a miniaturized polarimetric L-band synthetic aperture radar (SAR) for use on an unmanned aerial vehicle (UAV) or minimally piloted vehicle. Dryden's work in developing the Platform Precision Autopilot (PPA) capability is described in this presentation. The goal for the development is that the PPA shall fly the G-III within a 10 m (32.8 ft) diameter tube for at least 90% of each data take in conditions of calm to light atmospheric disturbances, as defined. The G-III aircraft is descrbed, the test plan is outlined, and the initial test results are reviewed.

  8. Epstein-Barr virus growth/latency III program alters cellular microRNA expression

    SciTech Connect

    Cameron, Jennifer E. Fewell, Claire Yin, Qinyan McBride, Jane Wang Xia Lin Zhen

    2008-12-20

    The Epstein-Barr virus (EBV) is associated with lymphoid and epithelial cancers. Initial EBV infection alters lymphocyte gene expression, inducing cellular proliferation and differentiation as the virus transitions through consecutive latency transcription programs. Cellular microRNAs (miRNAs) are important regulators of signaling pathways and are implicated in carcinogenesis. The extent to which EBV exploits cellular miRNAs is unknown. Using micro-array analysis and quantitative PCR, we demonstrate differential expression of cellular miRNAs in type III versus type I EBV latency including elevated expression of miR-21, miR-23a, miR-24, miR-27a, miR-34a, miR-146a and b, and miR-155. In contrast, miR-28 expression was found to be lower in type III latency. The EBV-mediated regulation of cellular miRNAs may contribute to EBV signaling and associated cancers.

  9. DSN Scheduling Engine

    NASA Technical Reports Server (NTRS)

    Clement, Bradley; Johnston, Mark; Wax, Allan; Chouinard, Caroline

    2008-01-01

    The DSN (Deep Space Network) Scheduling Engine targets all space missions that use DSN services. It allows clients to issue scheduling, conflict identification, conflict resolution, and status requests in XML over a Java Message Service interface. The scheduling requests may include new requirements that represent a set of tracks to be scheduled under some constraints. This program uses a heuristic local search to schedule a variety of schedule requirements, and is being infused into the Service Scheduling Assembly, a mixed-initiative scheduling application. The engine resolves conflicting schedules of resource allocation according to a range of existing and possible requirement specifications, including optional antennas; start of track and track duration ranges; periodic tracks; locks on track start, duration, and allocated antenna; MSPA (multiple spacecraft per aperture); arraying/VLBI (very long baseline interferometry)/delta DOR (differential one-way ranging); continuous tracks; segmented tracks; gap-to-track ratio; and override or block-out of requirements. The scheduling models now include conflict identification for SOA(start of activity), BOT (beginning of track), RFI (radio frequency interference), and equipment constraints. This software will search through all possible allocations while providing a best-effort solution at any time. The engine reschedules to accommodate individual emergency tracks in 0.2 second, and emergency antenna downtime in 0.2 second. The software handles doubling of one mission's track requests over one week (to 42 total) in 2.7 seconds. Further tests will be performed in the context of actual schedules.

  10. New Round of Studies Begin in Phase 0/I/II Cancer Prevention Clinical Trials Program | Division of Cancer Prevention

    Cancer.gov

    The NCI Division of Cancer Prevention’s Phase 0/I/II Cancer Prevention Clinical Trials Program, also known as the Consortia for Early Phase Prevention Trials, is beginning a new round of studies in the effort toward systematic early clinical development of promising preventive agents for people at increased risk of developing cancer. Infographic Highlight New Round of Studies Begin in Phase 0/I/II Cancer Prevention Clinical Trials Program |

  11. Alternatives in Scheduling Patterns: Practitioner Implementation of Minicourse Programs in Selected Midwestern High Schools.

    ERIC Educational Resources Information Center

    Hansen, Patricia; Guenther, John

    The purposes of the document are to report on the status of social studies minicourse programs in selected midwestern high schools and to provide information to schools regarding obstacles to minicourses as alternatives to traditional programs. A 1976-77 survey of 265 midwestern high schools determined that only 60 (23%) of the schools offered…

  12. Regional Office Procedures. Stage I Final Report for the Study of Program Management Procedures in the Campus-Based and Basic Grant Programs. (Volume III).

    ERIC Educational Resources Information Center

    Puma, Michael J.

    Volume III of a study of program management procedures in the campus-based and Basic Educational Opportunity Grant (BEOG) programs provides a description of procedures employed within the U.S. Office of Education regional offices to administer the Basic Grant and campus-based student financial assistance programs. The objective of the report is to…

  13. Design and Evaluation of the User-Adapted Program Scheduling system based on Bayesian Network and Constraint Satisfaction

    NASA Astrophysics Data System (ADS)

    Iwasaki, Hirotoshi; Sega, Shinichiro; Hiraishi, Hironori; Mizoguchi, Fumio

    In recent years, lots of music content can be stored in mobile computing devices, such as a portable digital music player and a car navigation system. Moreover, various information content like news or traffic information can be acquired always anywhere by a cellular communication and a wireless LAN. However, usability issues arise from the simple interfaces of mobile computing devices. Moreover, retrieving and selecting such content poses safety issues, especially while driving. Thus, it is important for the mobile system to recommend content automatically adapted to user's preference and situation. In this paper, we present the user-adapted program scheduling that generates sequences of content (Program) suiting user's preference and situation based on the Bayesian network and the Constraint Satisfaction Problem (CSP) technique. We also describe the design and evaluation of its realization system, the Personal Program Producer (P3). First, preference such as a genre ratio of content in a program is learned as a Bayesian network model using simple operations such as a skip behavior. A model including each content tends to become large-scale. In order to make it small, we present the model separation method that carries out losslessly compression of the model. Using the model, probabilistic distributions of preference to generate constraints are inferred. Finally satisfying the constraints, a program is produced. This kind of CSP has an issue of which the number of variables is not fixedness. In order to make it variable, we propose a method using metavariables. To evaluate the above methods, we applied them to P3 on a car navigation system. User evaluations helped us clarify that the P3 can produce the program that a user prefers and adapt it to the user.

  14. 15 CFR Schedule I to Part 700 - Approved Programs and Delegate Agencies

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... programs: A1 Aircraft Department of Defense. 1 A2 Missiles Do. A3 Ships Do. A4 Tank—Automotive Do. A5..., including law enforcement Do. N6 Chemical, biological, radiological, and nuclear countermeasures Do....

  15. An approximation solution to refinery crude oil scheduling problem with demand uncertainty using joint constrained programming.

    PubMed

    Duan, Qianqian; Yang, Genke; Xu, Guanglin; Pan, Changchun

    2014-01-01

    This paper is devoted to develop an approximation method for scheduling refinery crude oil operations by taking into consideration the demand uncertainty. In the stochastic model the demand uncertainty is modeled as random variables which follow a joint multivariate distribution with a specific correlation structure. Compared to deterministic models in existing works, the stochastic model can be more practical for optimizing crude oil operations. Using joint chance constraints, the demand uncertainty is treated by specifying proximity level on the satisfaction of product demands. However, the joint chance constraints usually hold strong nonlinearity and consequently, it is still hard to handle it directly. In this paper, an approximation method combines a relax-and-tight technique to approximately transform the joint chance constraints to a serial of parameterized linear constraints so that the complicated problem can be attacked iteratively. The basic idea behind this approach is to approximate, as much as possible, nonlinear constraints by a lot of easily handled linear constraints which will lead to a well balance between the problem complexity and tractability. Case studies are conducted to demonstrate the proposed methods. Results show that the operation cost can be reduced effectively compared with the case without considering the demand correlation.

  16. Energy Engineering Analysis Program. Energy savings opportunity survey, Fort Huachuca, Arizona. Volume III, programming documents

    SciTech Connect

    1994-12-31

    Insulation is considered for selected buildings. Energy savings are evaluated using energy simulations employing the Carrier HAP program. Weather data is only available for large cities. El Paso Texas was selected as the closest city with a somewhat similar climate; results are adjusted based on Fort Huachuca and El Paso meteorological data.

  17. Phase I/II Study Evaluating Early Tolerance in Breast Cancer Patients Undergoing Accelerated Partial Breast Irradiation Treated With the MammoSite Balloon Breast Brachytherapy Catheter Using a 2-Day Dose Schedule

    SciTech Connect

    Wallace, Michelle; Martinez, Alvaro; Mitchell, Christina; Chen, Peter Y.; Ghilezan, Mihai; Benitez, Pamela; Brown, Eric; Vicini, Frank

    2010-06-01

    Purpose: Initial Phase I/II results using balloon brachytherapy to deliver accelerated partial breast irradiation (APBI) in 2 days in patients with early-stage breast cancer are presented. Materials and Methods: Between March 2004 and August 2007, 45 patients received adjuvant radiation therapy after lumpectomy with balloon brachytherapy in a Phase I/II trial delivering 2800 cGy in four fractions of 700 cGy. Toxicities were evaluated using the National Cancer Institute Common Toxicity Criteria for Adverse Events v3.0 scale and cosmesis was documented at >=6 months. Results: The median age was 66 years (range, 48-83) and median skin spacing was 12 mm (range, 8-24). The median follow-up was 11.4 months (5.4-48 months) with 21 patients (47%) followed >=1 year, 11 (24%) >=2 years, and 7 (16%) >=3 years. At <6 months (n = 45), Grade II toxicity rates were 9% radiation dermatitis, 13% breast pain, 2% edema, and 2% hyperpigmentation. Grade III breast pain was reported in 13% (n = 6). At >=6 months (n = 43), Grade II toxicity rates were: 2% radiation dermatitis, 2% induration, and 2% hypopigmentation. Grade III breast pain was reported in 2%. Infection was 13% (n = 6) at <6 months and 5% (n = 2) at >=6 months. Persistent seroma >=6 months was 30% (n = 13). Fat necrosis developed in 4 cases (2 symptomatic). Rib fractures were seen in 4% (n = 2). Cosmesis was good/excellent in 96% of cases. Conclusions: Treatment with balloon brachytherapy using a 2-day dose schedule resulted acceptable rates of Grade II/III chronic toxicity rates and similar cosmetic results observed with a standard 5-day accelerated partial breast irradiation schedule.

  18. 76 FR 5830 - FBI Records Management Division; National Name Check Program Section; New User Fees Schedule

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-02

    ... the NNCP to determine the current cost of processing name checks for noncriminal justice purposes and... Program for noncriminal justice purposes. The total resource costs associated with providing these name...(e)(2), the fee study employed the same Activity Based Cost (ABC) accounting method detailed in...

  19. Graduate Program Scheduling Gains Flexibility through Container Courses: A Case Study

    ERIC Educational Resources Information Center

    Rose, Richard

    2011-01-01

    Online course delivery makes possible one innovation which can provide each student with greater program flexibility as well as some personal ownership of the direction and pace of his degree progress. This concept can be called the "container course." A container course is the offering of more than one course simultaneously under a single course…

  20. 77 FR 43084 - Multiple Award Schedule (MAS) Program Continuous Open Season-Operational Change

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-23

    ... more successful in meeting its obligation to maximize opportunities for its small business partners and... in three key program areas: Small business viability, operational efficiency, and cost control. The... result in directing suppliers, including small businesses, to where government procurement needs...

  1. A Strategic Airlift Pilot Scheduling Technique Utilizing Statistical Analysis.

    DTIC Science & Technology

    1980-06-01

    33 Wild Card Schedule .................... 34 Summary .................................... 37 III. METHODOLOGY...Generation Cargo scheduling system was created. This sys- tem was centered on stabilizing the mission requirements. Second, the Wild Card Scheduling system...demonstrated improvement in crew return rates forced the early termination to this approach in stabil- izing the aircrew schedule. WILD CARD SCHEDULE

  2. A Visual Programming Methodology for Tactical Aircrew Scheduling and Other Applications

    DTIC Science & Technology

    1991-12-01

    environment, among other reasons. Our second porting attempt used the popular and powerful Tubo C compiler. We made progress using C, but development...the approach chosen by many neural net pror ja . It is not costly to either type of programmer to use this approach, and the data that turns out to be... neural network simulation, ou many comments made apply to object-oriented programming in general. 90 On Object-Oriented is elucidating the system, and

  3. KC-46 Tanker Aircraft: Program Generally Stable but Improvements in Managing Schedule Are Needed

    DTIC Science & Technology

    2013-02-27

    the government’s financial liability, and provide Boeing incentives to reduce costs in order to earn more profit . At this point in the program, both...environment is defined as technology readiness level 6, meaning that a model or prototype close to final form, fit, and function has been tested in a...impression of depth, or a 3rd dimension. Similar technology has been used on two foreign-operated refueling aircraft and a representative model

  4. Rural Inservice Using Alternate Scheduling.

    ERIC Educational Resources Information Center

    Kimmet, James L.

    Three small rural school districts in Montana and Wyoming used alternate school day scheduling to make time for staff and curriculum development inservice programs. The schedule of one short and four long days delivered the instructional time of 175 6-hour days each year. Benefits of alternate scheduling included time for regular inservice…

  5. Surprise Benefits of Arena Scheduling

    ERIC Educational Resources Information Center

    Surloff, Andrew

    2008-01-01

    One of the most challenging tasks a principal must accomplish every year is the construction of the master schedule. Free from the magnetic scheduling boards and wall charts of yesteryear, principals now have technological tools--such as programs that offer schools solutions for their scheduling needs--that can save time and enable them to work…

  6. Moral Education. Options in Education, Transcript for Program Scheduled for Broadcast the Week of September 13 [1976], Program No. 44.

    ERIC Educational Resources Information Center

    George Washington Univ., Washington, DC. Inst. for Educational Leadership.

    Teaching about moral issues is discussed in this transcript of "Options in Education," an electronic weekly magazine. Directed toward educators and students, the program covers news, features, policy, and people in the field of education and is available for broadcasting to member stations of National Public Radio. Seventeen montages…

  7. Round Robin Schedules.

    ERIC Educational Resources Information Center

    Iannone, Michael A.

    1983-01-01

    Presented is a computer program written in BASIC that covers round-robin schedules for team matches in competitions. The program was originally created to help teams in a tennis league play one match against every other team. Part of the creation of the program involved use of modulo arithmetic. (MP)

  8. A Study of the Education Professions Development Act Training Programs for Higher Education Personnel, Volume III: The EPDA V-E Training Programs. Final Report.

    ERIC Educational Resources Information Center

    Boyle, E.; Carlson, K.

    Volume III of a study of the Education Professions Development Act (EPDA) training programs for higher education personnel presents the second of a three-faceted approach to assess current needs. This document reviews the task of profiling EPDA V-E training programs to produce a small-scale information system. Section one reviews the profiling…

  9. 2012 Gordon Research Conference on Bioinspired Materials - Formal Schedule and Speaker/Poster Program

    SciTech Connect

    Chilkoti, Ashutosk

    2012-06-29

    The emerging, interdisciplinary field of Bioinspired Materials focuses on developing a fundamental understanding of the synthesis, directed self-assembly and hierarchical organization of natural occurring materials, and uses this understanding to engineer new bioinspired artificial materials for diverse applications. The inaugural 2012 Gordon Conference on Bioinspired Materials seeks to capture the excitement of this burgeoning field by a cutting-edge scientific program and roster of distinguished invited speakers and discussion leaders who will address the key issues in the field. The Conference will feature a wide range of topics, such as materials and devices from DNA, reprogramming the genetic code for design of new materials, peptide, protein and carbohydrate based materials, biomimetic systems, complexity in self-assembly, and biomedical applications of bioinspired materials.

  10. Computerized Schedule Effectiveness Technique /SET/ determines present and future schedule position

    NASA Technical Reports Server (NTRS)

    Ballard, D.; Birdsong, J.; Calva, R.

    1967-01-01

    Computerized scheduling system calculates an index of overall schedule-effectiveness. The schedule-effectiveness index is a measurement of actual overall performance against the existing schedule, and a series of schedule-effectiveness values indicates the trend of actual performance. This computer program is written in Fortran 4.

  11. NASA Schedule Management Handbook

    NASA Technical Reports Server (NTRS)

    2011-01-01

    The purpose of schedule management is to provide the framework for time-phasing, resource planning, coordination, and communicating the necessary tasks within a work effort. The intent is to improve schedule management by providing recommended concepts, processes, and techniques used within the Agency and private industry. The intended function of this handbook is two-fold: first, to provide guidance for meeting the scheduling requirements contained in NPR 7120.5, NASA Space Flight Program and Project Management Requirements, NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Requirements, NPR 7120.8, NASA Research and Technology Program and Project Management Requirements, and NPD 1000.5, Policy for NASA Acquisition. The second function is to describe the schedule management approach and the recommended best practices for carrying out this project control function. With regards to the above project management requirements documents, it should be noted that those space flight projects previously established and approved under the guidance of prior versions of NPR 7120.5 will continue to comply with those requirements until project completion has been achieved. This handbook will be updated as needed, to enhance efficient and effective schedule management across the Agency. It is acknowledged that most, if not all, external organizations participating in NASA programs/projects will have their own internal schedule management documents. Issues that arise from conflicting schedule guidance will be resolved on a case by case basis as contracts and partnering relationships are established. It is also acknowledged and understood that all projects are not the same and may require different levels of schedule visibility, scrutiny and control. Project type, value, and complexity are factors that typically dictate which schedule management practices should be employed.

  12. Optimal piecewise linear schedules for LSGP- and LPGS-decomposed array processors via quadratic programming

    NASA Astrophysics Data System (ADS)

    Zimmermann, Karl-Heinz; Achtziger, Wolfgang

    2001-09-01

    The size of a systolic array synthesized from a uniform recurrence equation, whose computations are mapped by a linear function to the processors, matches the problem size. In practice, however, there exist several limiting factors on the array size. There are two dual schemes available to derive arrays of smaller size from large-size systolic arrays based on the partitioning of the large-size arrays into subarrays. In LSGP, the subarrays are clustered one-to-one into the processors of a small-size array, while in LPGS, the subarrays are serially assigned to a reduced-size array. In this paper, we propose a common methodology for both LSGP and LPGS based on polyhedral partitionings of large-size k-dimensional systolic arrays which are synthesized from n-dimensional uniform recurrences by linear mappings for allocation and timing. In particular, we address the optimization problem of finding optimal piecewise linear timing functions for small-size arrays. These are mappings composed of linear timing functions for the computations of the subarrays. We study a continuous approximation of this problem by passing from piecewise linear to piecewise quasi-linear timing functions. The resultant problem formulation is then a quadratic programming problem which can be solved by standard algorithms for nonlinear optimization problems.

  13. Medicare program; replacement of reasonable charge methodology by fee schedules for parenteral and enteral nutrients, equipment, and supplies. Final rule.

    PubMed

    2001-08-28

    This final rule implements fee schedules for payment of parenteral and enteral nutrition (PEN) items and services furnished under the prosthetic device benefit, defined in section 1861(s)(8) of the Social Security Act. The authority for establishing these fee schedules is provided by the Balanced Budget Act of 1997, which amended the Social Security Act at section 1842(s). Section 1842(s) of the Social Security Act specifies that statewide or other area wide fee schedules may be implemented for the following items and services still subject to the reasonable charge payment methodology: medical supplies; home dialysis supplies and equipment; therapeutic shoes; parenteral and enteral nutrients, equipment, and supplies; electromyogram devices; salivation devices; blood products; and transfusion medicine. This final rule describes changes made to the proposed fee schedule payment methodology for these items and services and provides that the fee schedules for PEN items and services are effective for all covered items and services furnished on or after January 1, 2002. Fee schedules will not be implemented for electromyogram devices and salivation devices at this time since these items are not covered by Medicare. In addition, fee schedules will not be implemented for medical supplies, home dialysis supplies and equipment, therapeutic shoes, blood products, and transfusion medicine at this time since the data required to establish these fee schedules are inadequate.

  14. Medicare program; schedule of limits on home health agency costs per visit--HCFA. Notice with comment period.

    PubMed

    1995-02-14

    This notice with comment period sets forth a revised schedule of limits on home health agency costs that may be paid under the Medicare program for cost reporting periods beginning on or after July 1, 1993. These limits replace the per-visit limits that were set forth in our July 8, 1993 notice with comment period (58 FR 36748). This notice also provides, in accordance with the provisions of the Omnibus Budget Reconciliation Act of 1993 (OBRA '93), that there will be no changes in the home health agency (HHA) cost limits for cost reporting periods beginning on or after July 1, 1994, and before July 1, 1996. In addition, this notice responds to public comments on the July 8, 1993 notice with comment period, which originally set forth the HHA cost limits for cost reporting periods beginning on or after July 1, 1993, and on the January 6, 1994 notice with comment period (59 FR 760), which announced the elimination of the hospital based add-on effective for cost reporting periods beginning on or after October 1, 1993.

  15. 40 CFR 147.1751 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Environmental Law Enforcement Act of 1975, North Dakota Century Code Sections 32-40-01 to 32-40-11 (1976); (2..., III, IV and V wells. 147.1751 Section 147.1751 Protection of Environment ENVIRONMENTAL PROTECTION... Control Program) (1984); (b) Other laws. The following statutes and regulations, although not...

  16. 40 CFR 147.1751 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Environmental Law Enforcement Act of 1975, North Dakota Century Code Sections 32-40-01 to 32-40-11 (1976); (2..., III, IV and V wells. 147.1751 Section 147.1751 Protection of Environment ENVIRONMENTAL PROTECTION... Control Program) (1984); (b) Other laws. The following statutes and regulations, although not...

  17. 40 CFR 147.1751 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Environmental Law Enforcement Act of 1975, North Dakota Century Code Sections 32-40-01 to 32-40-11 (1976); (2..., III, IV and V wells. 147.1751 Section 147.1751 Protection of Environment ENVIRONMENTAL PROTECTION... Control Program) (1984); (b) Other laws. The following statutes and regulations, although not...

  18. 40 CFR 147.1751 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Environmental Law Enforcement Act of 1975, North Dakota Century Code Sections 32-40-01 to 32-40-11 (1976); (2..., III, IV and V wells. 147.1751 Section 147.1751 Protection of Environment ENVIRONMENTAL PROTECTION... Control Program) (1984); (b) Other laws. The following statutes and regulations, although not...

  19. 40 CFR 147.1751 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Environmental Law Enforcement Act of 1975, North Dakota Century Code Sections 32-40-01 to 32-40-11 (1976); (2..., III, IV and V wells. 147.1751 Section 147.1751 Protection of Environment ENVIRONMENTAL PROTECTION... Control Program) (1984); (b) Other laws. The following statutes and regulations, although not...

  20. Mapping of Primary Instructional Methods and Teaching Techniques for Regularly Scheduled, Formal Teaching Sessions in an Anesthesia Residency Program.

    PubMed

    Vested Madsen, Matias; Macario, Alex; Yamamoto, Satoshi; Tanaka, Pedro

    2016-06-01

    In this study, we examined the regularly scheduled, formal teaching sessions in a single anesthesiology residency program to (1) map the most common primary instructional methods, (2) map the use of 10 known teaching techniques, and (3) assess if residents scored sessions that incorporated active learning as higher quality than sessions with little or no verbal interaction between teacher and learner. A modified Delphi process was used to identify useful teaching techniques. A representative sample of each of the formal teaching session types was mapped, and residents anonymously completed a 5-question written survey rating the session. The most common primary instructional methods were computer slides-based classroom lectures (66%), workshops (15%), simulations (5%), and journal club (5%). The number of teaching techniques used per formal teaching session averaged 5.31 (SD, 1.92; median, 5; range, 0-9). Clinical applicability (85%) and attention grabbers (85%) were the 2 most common teaching techniques. Thirty-eight percent of the sessions defined learning objectives, and one-third of sessions engaged in active learning. The overall survey response rate equaled 42%, and passive sessions had a mean score of 8.44 (range, 5-10; median, 9; SD, 1.2) compared with a mean score of 8.63 (range, 5-10; median, 9; SD, 1.1) for active sessions (P = 0.63). Slides-based classroom lectures were the most common instructional method, and faculty used an average of 5 known teaching techniques per formal teaching session. The overall education scores of the sessions as rated by the residents were high.

  1. A computer program (HEVSIM) for heavy duty vehicle fuel economy and performance simulation. Volume III: Appendices A through F. Final report Mar-Oct 80

    SciTech Connect

    Buck, R.E.

    1981-09-01

    Volume III is the third and last volume of a three volume document describing the computer program HEVSIM. This volume includes appendices which list the HEVSIM program, sample part data, some typical outputs and updated nomenclature.

  2. Composite Scheduling

    ERIC Educational Resources Information Center

    Childers, Gary L.; Ireland, Rebecca Weeks

    2005-01-01

    In education, there is no one best way to do anything. There are compelling reasons why some courses should be taught in longer segments of time, which the block schedule provides. There are also compelling reasons why some classes should be taught in shorter segments. At Watauga High School in Boone, North Carolina, an alternative schedule that…

  3. Scheduling Supercomputers.

    DTIC Science & Technology

    1983-02-01

    no task is scheduled with overlap. Let numpi be the total number of preemptions and idle slots of size at most to that are introduced. We see that if...no usable block remains on Qm-*, then numpi < m-k. Otherwise, numpi ! m-k-1. If j>n when this procedure terminates, then all tasks have been scheduled

  4. Role of class III phosphatidylinositol 3-kinase during programmed nuclear death of Tetrahymena thermophila.

    PubMed

    Akematsu, Takahiko; Fukuda, Yasuhiro; Attiq, Rizwan; Pearlman, Ronald E

    2014-02-01

    Programmed nuclear death (PND) in the ciliate protozoan Tetrahymena thermophila is a novel type of autophagy that occurs during conjugation, in which only the parental somatic macronucleus is destined to die and is then eliminated from the progeny cytoplasm. Other coexisting nuclei, however, such as new micro- and macronuclei are unaffected. PND starts with condensation in the nucleus followed by apoptotic DNA fragmentation, lysosomal acidification, and final resorption. Because of the peculiarity in the process and the absence of some ATG genes in this organism, the mechanism of PND has remained unclear. In this study, we focus on the role of class III phosphatidylinositol 3-kinase (PtdIns3K, corresponding to yeast Vps34) in order to identify central regulators of PND. We identified the sole Tetrahymena thermophila ortholog (TtVPS34) to yeast Vps34 and human PIK3C3 (the catalytic subunit of PtdIns3K), through phylogenetic analysis, and generated the gene knockdown mutant for functional analysis. Loss of TtVPS34 activity prevents autophagosome formation on the parental macronucleus, and this nucleus escapes from the lysosomal pathway. In turn, DNA fragmentation and final resorption of the nucleus are drastically impaired. These phenotypes are similar to the situation in the ATG8Δ mutants of Tetrahymena, implying an inextricable link between TtVPS34 and TtATG8s in controlling PND as well as general macroautophagy. On the other hand, TtVPS34 does not appear responsible for the nuclear condensation and does not affect the progeny nuclear development. These results demonstrate that TtVPS34 is critically involved in the nuclear degradation events of PND in autophagosome formation rather than with an involvement in commitment to the death program.

  5. Scheduling game

    SciTech Connect

    Kleck, W

    1982-04-01

    Structuring a schedule - whether by Critical Path Method (CPM) or Precedence Charting System (PCS) - involves estimating the duration of one or more activities and arranging them in the most logical sequence. Given the start date, the completion date is relatively simple to determine. What is then so complicated about the process. It is complicated by the people involved - the people who make the schedules and the people who attempt to follow them. Schedules are an essential part of project management and construction contract administration. Much of the material available pertains to the mechanics of schedules, the types of logic networks, the ways that data can be generated and presented. This paper sheds light on other facets of the subject - the statistical and philosophical fundamentals involved in scheduling.

  6. An examination of the stretching practices of Division I and Division III college football programs in the midwestern United States.

    PubMed

    Judge, Lawrence W; Craig, Bruce; Baudendistal, Steve; Bodey, Kimberly J

    2009-07-01

    Research supports the use of preactivity warm-up and stretching, and the purpose of this study was to determine whether college football programs follow these guidelines. Questionnaires designed to gather demographic, professional, and educational information, as well as specific pre- and postactivity practices, were distributed via e-mail to midwestern collegiate programs from NCAA Division I and III conferences. Twenty-three male coaches (12 from Division IA schools and 11 from Division III schools) participated in the study. Division I schools employed certified strength coaches (CSCS; 100%), whereas Division III schools used mainly strength coordinators (73%), with only 25% CSCS. All programs used preactivity warm-up, with the majority employing 2-5 minutes of sport-specific jogging/running drills. Pre stretching (5-10 minutes) was performed in 19 programs (91%), with 2 (9%) performing no pre stretching. Thirteen respondents used a combination of static/proprioceptive neuromuscular facilitation/ballistic and dynamic flexibility, 5 used only dynamic flexibility, and 1 used only static stretching. All 12 Division I coaches used stretching, whereas only 9 of the 11 Division III coaches did (p = 0.22). The results indicate that younger coaches did not use pre stretching (p = 0.30). The majority of the coaches indicated that they did use post stretching, with 11 of the 12 Division I coaches using stretching, whereas only 5 of the 11 Division III coaches used stretching postactivity (p = 0.027). Divisional results show that the majority of Division I coaches use static-style stretching (p = 0.049). The results of this study indicate that divisional status, age, and certification may influence how well research guidelines are followed. Further research is needed to delineate how these factors affect coaching decisions.

  7. Introduction of sequential inactivated polio vaccine-oral polio vaccine schedule for routine infant immunization in Brazil's National Immunization Program.

    PubMed

    Domingues, Carla Magda Allan S; de Fátima Pereira, Sirlene; Cunha Marreiros, Ana Carolina; Menezes, Nair; Flannery, Brendan

    2014-11-01

    In August 2012, the Brazilian Ministry of Health introduced inactivated polio vaccine (IPV) as part of sequential polio vaccination schedule for all infants beginning their primary vaccination series. The revised childhood immunization schedule included 2 doses of IPV at 2 and 4 months of age followed by 2 doses of oral polio vaccine (OPV) at 6 and 15 months of age. One annual national polio immunization day was maintained to provide OPV to all children aged 6 to 59 months. The decision to introduce IPV was based on preventing rare cases of vaccine-associated paralytic polio, financially sustaining IPV introduction, ensuring equitable access to IPV, and preparing for future OPV cessation following global eradication. Introducing IPV during a national multivaccination campaign led to rapid uptake, despite challenges with local vaccine supply due to high wastage rates. Continuous monitoring is required to achieve high coverage with the sequential polio vaccine schedule.

  8. Medicare program; schedules of limits and prospectively determined payment rates for skilled nursing facility inpatient routine service costs--HCFA. Final notice with comment period.

    PubMed

    1997-10-01

    This final notice with comment period sets forth an updated schedule of limits on skilled nursing facility (SNF) routine service costs for which payment may be made under the Medicare program and sets forth an updated schedule of payment rates for low Medicare volume SNFs that elect to receive prospectively determined payment rates for routine service costs. Section 1888(a) of the Social Security Act (the Act) requires that the Secretary update the per diem cost limits for SNF routine service costs for cost reporting periods beginning on or after October 1, 1995, and every 2 years thereafter. In addition, section 1888(d)(4) of the Act requires the Secretary to establish and publish prospectively determined payment rates at least 90 days prior to the beginning of the Federal fiscal year (FY) to which such rates are to be applied.

  9. 76 FR 42771 - Medicare Program; Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-19

    ...This proposed rule addresses changes to the physician fee schedule and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. It also addresses, implements or discusses certain provisions of the Patient Protection and Affordable Care Act, as amended by the Health Care and Education......

  10. 75 FR 40039 - Medicare Program; Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-13

    ...This proposed rule addresses proposed changes to the physician fee schedule and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. It also addresses, implements or discusses certain provisions of both the Affordable Care Act and the Medicare Improvements for Patients and Providers Act......

  11. Mission scheduling

    NASA Technical Reports Server (NTRS)

    Gaspin, Christine

    1989-01-01

    How a neural network can work, compared to a hybrid system based on an operations research and artificial intelligence approach, is investigated through a mission scheduling problem. The characteristic features of each system are discussed.

  12. Automation Improves Schedule Quality and Increases Scheduling Efficiency for Residents

    PubMed Central

    Perelstein, Elizabeth; Rose, Ariella; Hong, Young-Chae; Cohn, Amy; Long, Micah T.

    2016-01-01

    Background Medical resident scheduling is difficult due to multiple rules, competing educational goals, and ever-evolving graduate medical education requirements. Despite this, schedules are typically created manually, consuming hours of work, producing schedules of varying quality, and yielding negative consequences for resident morale and learning. Objective To determine whether computerized decision support can improve the construction of residency schedules, saving time and improving schedule quality. Methods The Optimized Residency Scheduling Assistant was designed by a team from the University of Michigan Department of Industrial and Operations Engineering. It was implemented in the C.S. Mott Children's Hospital Pediatric Emergency Department in the 2012–2013 academic year. The 4 metrics of schedule quality that were compared between the 2010–2011 and 2012–2013 academic years were the incidence of challenging shift transitions, the incidence of shifts following continuity clinics, the total shift inequity, and the night shift inequity. Results All scheduling rules were successfully incorporated. Average schedule creation time fell from 22 to 28 hours to 4 to 6 hours per month, and 3 of 4 metrics of schedule quality significantly improved. For the implementation year, the incidence of challenging shift transitions decreased from 83 to 14 (P < .01); the incidence of postclinic shifts decreased from 72 to 32 (P < .01); and the SD of night shifts dropped by 55.6% (P < .01). Conclusions This automated shift scheduling system improves the current manual scheduling process, reducing time spent and improving schedule quality. Embracing such automated tools can benefit residency programs with shift-based scheduling needs. PMID:26913102

  13. 2007 Wholesale Power Rate Schedules : 2007 General Rate Schedule Provisions.

    SciTech Connect

    United States. Bonneville Power Administration.

    2006-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  14. 77 FR 44721 - Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule, DME Face to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-30

    ...This major proposed rule addresses changes to the physician fee schedule, payments for Part B drugs, and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. It would also implement provisions of the Affordable Care Act by establishing a face-to-face encounter as a condition of payment......

  15. 77 FR 68891 - Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule, DME Face-to...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-16

    ...This major final rule with comment period addresses changes to the physician fee schedule, payments for Part B drugs, and other Medicare Part B payment policies to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. It also implements provisions of the Affordable Care Act by establishing a face-to-face encounter as a condition......

  16. A Comparison of Earned Value and Earned Schedule Duration Forecast Methods on Department of Defense Major Defense Acquisition Programs

    DTIC Science & Technology

    2012-09-01

    guidelines have been adopted by the American National Standards Institute/Electronic Industries Alliance (ANSI/ EIA - 748 EVMS) and are being used by both...than $50 million in then-year dollars follow the thirty-two management guidelines published in ANSI/ EIA - 748 EVMS, submit a monthly CPR, and a monthly...Department of Defense DoDI Department of Defense Instruction EIA Electronic Industries Alliance ES Earned Schedule EV Earned Value EVav Average

  17. NIF Title III engineering plan

    SciTech Connect

    Deis, G

    1998-06-01

    The purpose of this document is to define the work that must be accomplished by the NIF Project during Title III Engineering. This definition is intended to be sufficiently detailed to provide a framework for yearly planning, to clearly identify the specific deliverables so that the Project teams can focus on them, and to provide a common set of objectives and processes across the Project. This plan has been preceded by similar documents for Title I and Title II design and complements the Site Management Plan, the Project Control Manual, the Quality Assurance Program Plan, the RM Parsons NIF Title III Configuration Control Plan, the Integrated Project Schedule, the Preliminary Safety Analysis Report, the Configuration Management Plan, and the Transition Plan.

  18. How should periods without social interaction be scheduled? Children's preference for practical schedules of positive reinforcement.

    PubMed

    Luczynski, Kevin C; Hanley, Gregory P

    2014-01-01

    Several studies have shown that children prefer contingent reinforcement (CR) rather than yoked noncontingent reinforcement (NCR) when continuous reinforcement is programmed in the CR schedule. Preference has not, however, been evaluated for practical schedules that involve CR. In Study 1, we assessed 5 children's preference for obtaining social interaction via a multiple schedule (periods of fixed-ratio 1 reinforcement alternating with periods of extinction), a briefly signaled delayed reinforcement schedule, and an NCR schedule. The multiple schedule promoted the most efficient level of responding. In general, children chose to experience the multiple schedule and avoided the delay and NCR schedules, indicating that they preferred multiple schedules as the means to arrange practical schedules of social interaction. In Study 2, we evaluated potential controlling variables that influenced 1 child's preference for the multiple schedule and found that the strong positive contingency was the primary variable.

  19. Payload crew training scheduler (PACTS) user's manual

    NASA Technical Reports Server (NTRS)

    Shipman, D. L.

    1980-01-01

    The operation of the payload specialist training scheduler (PACTS) is discussed in this user's manual which is used to schedule payload specialists for mission training on the Spacelab experiments. The PACTS program is a fully automated interactive, computerized scheduling program equipped with tutorial displays. The tutorial displays are sufficiently detailed for use by a program analyst having no computer experience. The PACTS program is designed to operate on the UNIVAC 1108 computer system, and has the capability to load output into a PDP 11/45 Interactive Graphics Display System for printing schedules. The program has the capacity to handle up to three overlapping Spacelab missions.

  20. Scheduling algorithms

    NASA Astrophysics Data System (ADS)

    Wolfe, William J.; Wood, David; Sorensen, Stephen E.

    1996-12-01

    This paper discusses automated scheduling as it applies to complex domains such as factories, transportation, and communications systems. The window-constrained-packing problem is introduced as an ideal model of the scheduling trade offs. Specific algorithms are compared in terms of simplicity, speed, and accuracy. In particular, dispatch, look-ahead, and genetic algorithms are statistically compared on randomly generated job sets. The conclusion is that dispatch methods are fast and fairly accurate; while modern algorithms, such as genetic and simulate annealing, have excessive run times, and are too complex to be practical.

  1. Planning and scheduling for success

    NASA Technical Reports Server (NTRS)

    Manzanera, Ignacio

    1994-01-01

    Planning and scheduling programs are excellent management tools when properly introduced to the project management team and regularly maintained. Communications, creativity, flexibility and accuracy are substantially improved by following a simple set of rules. A planning and scheduling program will work for you if you believe in it, make others in your project team realize its benefits, and make it an extension of your project cost control philosophy.

  2. A Linear Programming Model for Scheduling Prison Guards. Applications of Linear Programming to Operations Research. Modules and Monographs in Undergraduate Mathematics and Its Applications Project. UMAP Module 272.

    ERIC Educational Resources Information Center

    Maynard, James M.

    A work-scheduling model for Corrections Officers at State Correctional Institutions is described. This is a real-life model that was developed to deal with a problem of unacceptably large expenditures for overtime work by state prison guards. The problem involves more than 200 constraints and more than 800 variables. It is felt the model can be…

  3. Program for Assisting the Replacement of Industrial Solvents PARIS III User’s Guide

    EPA Science Inventory

    PARIS III is a third generation Windows-based computer software to assist the design of less harmful solvent replacements by estimating values of the solvent properties that characterize the static, dynamic, performance, and environmental behavior of the original solvent mixture ...

  4. Gang scheduling a parallel machine

    SciTech Connect

    Gorda, B.C.; Brooks, E.D. III.

    1991-03-01

    Program development on parallel machines can be a nightmare of scheduling headaches. We have developed a portable time sharing mechanism to handle the problem of scheduling gangs of processors. User program and their gangs of processors are put to sleep and awakened by the gang scheduler to provide a time sharing environment. Time quantums are adjusted according to priority queues and a system of fair share accounting. The initial platform for this software is the 128 processor BBN TC2000 in use in the Massively Parallel Computing Initiative at the Lawrence Livermore National Laboratory. 2 refs., 1 fig.

  5. Gang scheduling a parallel machine

    SciTech Connect

    Gorda, B.C.; Brooks, E.D. III.

    1991-12-01

    Program development on parallel machines can be a nightmare of scheduling headaches. We have developed a portable time sharing mechanism to handle the problem of scheduling gangs of processes. User programs and their gangs of processes are put to sleep and awakened by the gang scheduler to provide a time sharing environment. Time quantum are adjusted according to priority queues and a system of fair share accounting. The initial platform for this software is the 128 processor BBN TC2000 in use in the Massively Parallel Computing Initiative at the Lawrence Livermore National Laboratory.

  6. 48 CFR 2908.404 - Using schedules.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SOURCES OF SUPPLIES AND SERVICES Federal Supply Schedules 2908.404 Using schedules. Small business... followed may be modified by the Office of Small Business Program as appropriate in order to comply with GSA Federal Supply Schedule procedures (e.g., first tier contracts may be required to report their...

  7. What Do Schools Want? Assessing Elementary School Administrator and Teacher Preferences Related to Nutrition Education Program Scheduling

    ERIC Educational Resources Information Center

    Hermann, Janice; Parker, Stephany; Phelps, Josh; Brown, Barbara

    2011-01-01

    Extension is positioned to provide school-based nutrition education programs as required by the 2004 Child Nutrition and WIC Reauthorization Act. To enhance program acceptance and sustainability, it is important to consider school administrators' and teachers' interests and preferences regarding nutrition education programming. The project…

  8. ASTER Scheduling Prioritization Function

    NASA Technical Reports Server (NTRS)

    Cohen, Ron

    1996-01-01

    ASTER schedules are generated by an automated scheduling system. This scheduler will generate psuedo-optimal schedules based on a priority scheme. This priority scheme is controlled by the Science Team.

  9. Astronaut Office Scheduling System Software

    NASA Technical Reports Server (NTRS)

    Brown, Estevancio

    2010-01-01

    AOSS is a highly efficient scheduling application that uses various tools to schedule astronauts weekly appointment information. This program represents an integration of many technologies into a single application to facilitate schedule sharing and management. It is a Windows-based application developed in Visual Basic. Because the NASA standard office automation load environment is Microsoft-based, Visual Basic provides AO SS developers with the ability to interact with Windows collaboration components by accessing objects models from applications like Outlook and Excel. This also gives developers the ability to create newly customizable components that perform specialized tasks pertaining to scheduling reporting inside the application. With this capability, AOSS can perform various asynchronous tasks, such as gathering/ sending/ managing astronauts schedule information directly to their Outlook calendars at any time.

  10. A Systematic Review of Health-Promotion Programs in NCAA Division III Institutions

    ERIC Educational Resources Information Center

    Hanson, Matthew

    2011-01-01

    Health-promotion in the workplace has existed for numerous years. However, the availability of health-promotion programs offered in institutions of higher education has seemed to lag behind other industries such as business. The purpose of this survey research project was to identify specific components of health-promotion programs within NCAA…

  11. Systematic Instruction for Retarded Children: The Illinois Program. Part III: Self-Help Instruction.

    ERIC Educational Resources Information Center

    Linford, Maxine D.; And Others

    The manual for programed instruction of self care skills for trainable mentally handicapped children consists of dressing, dining, grooming, and toilet training. Teaching methods used include behavioral analysis and management, task analysis, and errorless learning. The lesson plans in each section are programed to maximize the child's success at…

  12. Phase III Executive Summary. Evaluation of the Child and Family Resource Program (CFRP).

    ERIC Educational Resources Information Center

    Nauta, Marrit J.

    The Child and Family Resource Program (CFRP) is a family-oriented child development program initiated by the Administration for Children, Youth and Families to provide support services to low-income families and their children. This report summarizes preliminary findings based on the first year and a half of CFRP evalution. Following the brief…

  13. Phase III Research Report. Evaluation of the Child and Family Resource Program (CFRP).

    ERIC Educational Resources Information Center

    Nauta, Marrit J.; And Others

    This report, sixth in a series of Child and Family Resource Program (CFRP) evaluations, focuses on CFRP impact on families within outcome domains other than child development after a year and a half of program participation, additionally describing the nature and extent of that participation. Chapter 1 provides an overview of the CFRP evaluation…

  14. SARDA Surface Schedulers

    NASA Technical Reports Server (NTRS)

    Malik, Waqar

    2016-01-01

    Provide an overview of algorithms used in SARDA (Spot and Runway Departure Advisor) HITL (Human-in-the-Loop) simulation for Dallas Fort-Worth International Airport and Charlotte Douglas International airport. Outline a multi-objective dynamic programming (DP) based algorithm that finds the exact solution to the single runway scheduling (SRS) problem, and discuss heuristics to restrict the search space for the DP based algorithm and provide improvements.

  15. The Biennial Report to Congress on the Implementation of the Title III State Formula Grant Program: School Years 2006-08

    ERIC Educational Resources Information Center

    Office of English Language Acquisition, US Department of Education, 2012

    2012-01-01

    This is the third biennial report to Congress on the implementation of the "Elementary and Secondary Education Act's" Title III State Formula Grant Program (also known as the English Language Acquisition State Grants Program). This report provides information regarding the U.S. Department of Education's efforts to hold states accountable…

  16. The Biennial Report to Congress on the Implementation of the Title III State Formula Grant Program: School Years 2008-10

    ERIC Educational Resources Information Center

    Office of English Language Acquisition, US Department of Education, 2013

    2013-01-01

    This is the fourth biennial report to Congress on the implementation of the "Elementary and Secondary Education Act's" Title III State Formula Grant Program (also known as the English Language Acquisition State Grants Program). This report provides information reported by states to the U.S. Department of Education regarding services…

  17. ORTEP-III: Oak Ridge Thermal Ellipsoid Plot Program for crystal structure illustrations

    SciTech Connect

    Burnett, M.N.; Johnson, C.K.

    1996-07-01

    This report describes a computer program for drawing crystal structure illustrations. Ball-and-stick type illustrations of a quality suitable for publication are produced with either spheres or thermal-motion probability ellipsoids on the atomic sites. The program can also produce stereoscopic pairs of illustrations which aid in the visualization of complex packing arrangements of atoms and thermal motion patterns. Interatomic distances, bond angles, and principal axes of thermal motion are also calculated to aid the structural study.

  18. 21 CFR 1308.13 - Schedule III.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... alkaloid, in limited quantities as set forth below: (i) Not more than 1.8 grams of codeine per 100... isoquinoline alkaloid of opium 9803 (ii) Not more than 1.8 grams of codeine per 100 milliliters or not more... isoquinoline alkaloid of opium 9805 (iv) Not more than 300 milligrams of dihydrocodeinone (hydrocodone) per...

  19. 21 CFR 1308.13 - Schedule III.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... drugs, or their salts calculated as the free anhydrous base or alkaloid, in limited quantities as set... per dosage unit, with an equal or greater quantity of an isoquinoline alkaloid of opium 9803 (ii) Not... per dosage unit, with a fourfold or greater quantity of an isoquinoline alkaloid of opium 9805...

  20. 21 CFR 1308.13 - Schedule III.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... alkaloid, in limited quantities as set forth below: (i) Not more than 1.8 grams of codeine per 100... isoquinoline alkaloid of opium 9803 (ii) Not more than 1.8 grams of codeine per 100 milliliters or not more... isoquinoline alkaloid of opium 9805 (iv) Not more than 300 milligrams of dihydrocodeinone (hydrocodone) per...

  1. A System for Automatically Generating Scheduling Heuristics

    NASA Technical Reports Server (NTRS)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  2. Evaluation of the Program: Randall Aerospace and Marine Science Program. A Title III Evaluation Project, Final Report.

    ERIC Educational Resources Information Center

    Goldberg, Isadore

    An interdisciplinary program related to aerospace and marine topics was created for students in the ninth and tenth grades in Washington, D.C. The curriculum and staff development focused upon the development of experiences incorporated within science, mathematics, communication skills, career education, and physical education. Objectives of the…

  3. Evaluation of scheduling techniques for payload activity planning

    NASA Technical Reports Server (NTRS)

    Bullington, Stanley F.

    1991-01-01

    Two tasks related to payload activity planning and scheduling were performed. The first task involved making a comparison of space mission activity scheduling problems with production scheduling problems. The second task consisted of a statistical analysis of the output of runs of the Experiment Scheduling Program (ESP). Details of the work which was performed on these two tasks are presented.

  4. PIP-III and future opportunities in the US Neutrino Programs

    NASA Astrophysics Data System (ADS)

    Derwent, Paul

    2017-01-01

    The focus of Fermilab's long term research program is the physics of neutrino oscillations. The Deep Underground Neutrino Experiment (DUNE), located at the Sanford Underground Research Facility in Lead, South Dakota, will study neutrino oscillations with a baseline of 1300 km. The neutrinos will be produced in the Long Baseline Neutrino Facility (LBNF), a proposed new beam line from Fermilab's Main Injector. The physics goals of DUNE require a proton beam with a power of roughly 2.5 MW at 120 GeV, which is about four times the current maximum power. In addition to the long baseline program, Fermilab is pursuing a comprehensive program to investigate short baseline neutrino physics. I will present a view on how the Fermilab accelerator complex will evolve to meet these goals.

  5. Evolutionary Scheduler for the Deep Space Network

    NASA Technical Reports Server (NTRS)

    Guillaume, Alexandre; Lee, Seungwon; Wang, Yeou-Fang; Zheng, Hua; Chau, Savio; Tung, Yu-Wen; Terrile, Richard J.; Hovden, Robert

    2010-01-01

    A computer program assists human schedulers in satisfying, to the maximum extent possible, competing demands from multiple spacecraft missions for utilization of the transmitting/receiving Earth stations of NASA s Deep Space Network. The program embodies a concept of optimal scheduling to attain multiple objectives in the presence of multiple constraints.

  6. Creating a Complex Schedule with "REFLEX."

    ERIC Educational Resources Information Center

    Kren, George M.; Christakes, George

    1991-01-01

    Discusses "REFLEX," a software package for scheduling. Explores the program's applications in preparing a departmental class schedule. Explains that "REFLEX" includes a filter function and some attributes of a spreadsheet but lacks the ability to interact with other databases. Concludes that the program can make scheduling…

  7. The Survey of College Marketing Programs. Volume III: Electronic Advertising and Marketing.

    ERIC Educational Resources Information Center

    Primary Research Group, Inc., New York, NY.

    This report presents 203 tables detailing findings concerning the use of electronic advertising within marketing programs at 68 colleges and universities. Highlights of this report include: colleges in the sample enroll a mean of 5,450 students; 5.6 percent of the colleges produce a CD-ROM version of the viewbook; 39.7 percent enable applicants to…

  8. Core III Materials for Rural Agriculture Programs. Units A-G.

    ERIC Educational Resources Information Center

    Courson, Roger L.; And Others

    This curriculum guide includes teaching packets for 12 areas of study to be included in a core curriculum for 11th-grade or third-year students enrolled in rural agricultural programs in Illinois. Each problem area includes some or all of the following components: suggestions to the teacher, teacher guide, competency inventory, information sheet,…

  9. Habilitation of the Severely and Profoundly Retarded: Volume III. Reports from the Specialized Training Program.

    ERIC Educational Resources Information Center

    Horner, Robert H., Ed.; Bellamy, G. Thomas, Ed.

    Sixteen papers concerned with vocational habilitation of the severely and profoundly retarded are organized into three parts: issues in habilitation, stimulus control of vocational behavior, and instrumentation for program evaluation. Papers have the following titles and authors: "Structured Employment: Productivity and Productive Capacity" (R.…

  10. Core III Materials for Rural Agriculture Programs. Units H-I.

    ERIC Educational Resources Information Center

    Courson, Roger L.; And Others

    This curriculum guide includes teaching packets for nine problem areas of study to be included in a core curriculum for 11th-grade or third-year students enrolled in rural agricultural programs in Illinois. Each problem area includes some or all of the following components: suggestions to the teacher, a teacher guide, a competency inventory, an…

  11. Core III Materials for Metropolitan Agriculture/Horticulture Programs. Units J-M.

    ERIC Educational Resources Information Center

    Biondo, Ron; And Others

    This second volume of a two-volume curriculum guide contains 11 problem areas selected for study to be included in a core curriculum for 11th grade or third-year students enrolled in a metropolitan agricultural program. The 11 problem areas are divided into four units: Soil Science and Conservation of Natural Resources (Understanding Soils,…

  12. Core III Materials for Metropolitan Agriculture/Horticulture Programs. Units A-I.

    ERIC Educational Resources Information Center

    Biondo, Ron; And Others

    This first volume of a two-volume curriculum guide contains 11 problem areas selected for study to be included in a core curriculum for 11th-grade or third-year students enrolled in a metropolitan agricultural program. The 11 problem areas are divided into eight units: Orientation to Agricultural Occupations (Gaining Employment), Supervised…

  13. Evaluation of the National Science Foundation's Local Course Improvement Program, Volume III: Case Studies.

    ERIC Educational Resources Information Center

    Kulik, James A.; And Others

    This report is the third of three volumes describing the results of the evaluation of the National Science Foundation (NSF) Local Course Improvement (LOCI) program. This volume describes 12 project case studies undertaken as part of that evaluation. Three projects were designed to increase individualization of college science teaching; two…

  14. Effectiveness and Efficiency of Nursing Education Programs. Volume III: Analysis of the Literature.

    ERIC Educational Resources Information Center

    Cresap, McCormick, and Paget, Inc., Washington, DC.

    The three volume study is a review of the available literature to determine the relative effectiveness and efficiency of diploma, associate degree, and baccalaureate nursing education programs in producing the number and quality of registered nurses needed in the nation; and to analyze the cost of nursing education. Volume three notes that a mild…

  15. A Guide for Planning Drafting and Design Technology Programs. Section III, Data Collection and Analysis.

    ERIC Educational Resources Information Center

    1971

    This document, the second of three related reports, constitutes the data collection and analysis section of the study designed to provide information for preparing a planning guide for drafting and design technology programs. The curriculum survey instrument mailed to 26 schools, contained questions regarding: (1) length of semesters, (2)…

  16. 25 CFR 36.12 - Standard III-Program needs assessment.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Management § 36.12 Standard III—Program needs assessment. The policy and procedures of each school and its... educational goals and objectives. A student educational goal is defined as a statement of the knowledge... educational objectives are defined as statements of more specific knowledge, skills, attitudes, or...

  17. Pseudomonas type III effector AvrPtoB induces plant disease susceptibility by inhibition of host programmed cell death

    PubMed Central

    Abramovitch, Robert B.; Kim, Young-Jin; Chen, Shaorong; Dickman, Martin B.; Martin, Gregory B.

    2003-01-01

    The AvrPtoB type III effector protein is conserved among diverse genera of plant pathogens suggesting it plays an important role in pathogenesis. Here we report that Pseudomonas AvrPtoB acts inside the plant cell to inhibit programmed cell death (PCD) initiated by the Pto and Cf9 disease resistance proteins and, remarkably, the pro-apoptotic mouse protein Bax. AvrPtoB also suppressed PCD in yeast, demonstrating that AvrPtoB functions as a cell death inhibitor across kingdoms. Using truncated AvrPtoB proteins, we identified distinct N- and C-terminal domains of AvrPtoB that are sufficient for host recognition and PCD inhibition, respectively. We also identified a novel resistance phenotype, Rsb, that is triggered by an AvrPtoB truncation disrupted in the anti-PCD domain. A Pseudomonas syringae pv. tomato DC3000 strain with a chromosomal mutation in the AvrPtoB C-terminus elicited Rsb-mediated immunity in previously susceptible tomato plants and disease was restored when full-length AvrPtoB was expressed in trans. Thus, our results indicate that a type III effector can induce plant susceptibility to bacterial infection by inhibiting host PCD. PMID:12505984

  18. Dance-based exercise program in rheumatoid arthritis. Feasibility in individuals with American College of Rheumatology functional class III disease.

    PubMed

    Noreau, L; Moffet, H; Drolet, M; Parent, E

    1997-01-01

    Many studies have demonstrated that aerobic exercise training is beneficial to prevent physical deconditioning in persons with rheumatoid arthritis (RA) without inducing adverse effects on individual's joints and general health. After significant results in individuals with RA (Functional Class I and II), the present study was conducted to demonstrate the feasibility of a modified dance-based exercise program to improve the physical fitness and psychological state of persons with RA (Class III). Ten (10) female subjects (mean age, 54 +/- 10 years) participated in an eight-week exercise program (twice weekly). Health status, use of medication, joint pain and swelling, cardiorespiratory fitness, activity of daily living, and psychological state were assessed before and after the training program. A high level of participation has been maintained by the participants (mean = 14.8/16 sessions). Most of them were able to perform a maximal exercise test on treadmill and reached 90% of the predicted heart rate at maximal exercise. No significant gain in aerobic power was observed for the group as a whole, but four subjects showed improvements of between 10% and 20% of their cardiorespiratory fitness. Positive changes in depression, anxiety, fatigue, and tension were observed after the eight-week exercise program. No deleterious effect on the health status was observed. These findings provide some evidences as to the feasibility of submitting individuals with RA to a modified dance-exercise program. Further studies, however, are required to determine the long-term effect of weight-bearing exercise on the health status of individuals with RA.

  19. Family Contribution Schedule for the Basic Educational Opportunity Grant Program, 1979. Hearing Before the Subcommittee on Education, Arts and Humanities of the Committee on Labor and Human Resources, United States Senate, Ninety-Sixth Congress (April 6, 1979).

    ERIC Educational Resources Information Center

    Congress of the U.S., Washington, DC. Senate Committee on Human Resources.

    The text of a hearing before the Senate Subcommittee on Education, Arts and Humanities is presented in which the family contribution schedule for the Basic Educational Opportunity Grant (BEOG) Program for 1979 was discussed. A letter from Joseph Califano, Secretary of Health, Education and Welfare, states that implementation of the BEOG program…

  20. Energy Economic Data Base (EEDB) Program. Phase III. Final report and third update

    SciTech Connect

    Crowley, J. H.; Allen, R. E.; Aklu, G. L.; Benedict, R. G.; Brown, P. E.; Hodson, J. S.; Kaminski, R. S.; Lee, N. H.; Marda, R. S.; Martin, R. J.; Molin, A. T.; Smith, M. H.; Sosnowicz, E. J.; Valorie, C. M.; Woodhull, A. S.; Ziegler, E. J.

    1981-07-01

    The objective of the USDOE EEDB Program is to provide periodic updates of technical and cost (capital, fuel and operating and maintenance) information of significance to the US Department of Energy. This information is intended to be used by USDOE in evauating and monitoring US civilian nuclear power programs, and to provide them with a consistent means of evaluating the nuclear option and proposed alternatives. The data tables, which make up the bulk of the report, are updated to January 1, 1980. The data in these tables and in the backup data file supercede the information presented in the Second Update (1979). Where required, new descriptive information is added in the text to supplement the data tables.

  1. DOD Operational Testing: Oversight Has Resulted in Few Significant Disputes and Limited Program Cost and Schedule Increases

    DTIC Science & Technology

    2015-06-01

    requirement to complete IOT &E using production-representative systems. Program officials disagreed with DOT&E’s assessment that the material change was...through statistical analysis was the minimum number of cycles required to reduce test risk and demonstrate system effectiveness at IOT &E...planned for IOT &E at Fort Hood, which reduces risk identified in previous test proposals. Test efficiencies are expected from employing soldiers in IOT

  2. The Oral History Program: III. Personal views of health sciences librarianship and the Medical Library Association.

    PubMed Central

    McKenzie, D; Pifalo, V

    1998-01-01

    The Medical Library Association Oral History Program uses accepted oral history techniques to collect and preserve interviews with members. The original taped interviews and transcripts are kept in the Medical Library Association archives and made available for research purposes; edited copies of the interviews are distributed through the National Network of Libraries of Medicine, and members are encouraged to borrow and read the histories. Summaries of forty-three interviews provide personal views on health sciences librarianship and the Medical Library Association. PMID:9803287

  3. The Research Program at RIBRAS (Radioactive Ion Beams in Brasil)-III

    SciTech Connect

    Lichtenthaeler, R.; Lepine-Szily, A.; Guimaraes, V.; Faria, P. N. de; Mendes, D. R. Jr; Pires, K. C. C.; Morcelle, V.; Barioni, A.; Morais, M. C.; Pampa Condori, R.; Assuncao, M.; Moro, A. M.; Rodriguez-Gallardo, M.; Arazi, A.

    2010-04-30

    A part of the research program developed in the RIBRAS facility over the last four years is presented. Experiments using radioactive secondary beams of light exotic nuclei such as {sup 6}He, {sup 7}Be, {sup 8}Li on several targets have been performed. Elastic angular distributions have been analysed by the Optical Model and four body Continuous Discretized Coupled Channels Calculations (4b-CDCC) and the total reaction cross sections have been obtained. A comparison between the reaction cross sections of {sup 6}He and other stable projectiles with medium-heavy targets was performed. Measurements of the proton transfer reaction {sup 12}C({sup 8}Li,{sup 9}Be){sup 11}B are also presented.

  4. Evolution of carfilzomib dose and schedule in patients with multiple myeloma: a historical overview.

    PubMed

    Jakubowiak, Andrzej J

    2014-07-01

    Carfilzomib is a proteasome inhibitor that binds selectively and irreversibly to its target. In July 2012, carfilzomib received accelerated approval in the United States for the treatment of relapsed and refractory multiple myeloma. Based on emerging preclinical data and clinical results, the total dose, infusion time, and administration schedule of carfilzomib have evolved during phase I and phase II clinical studies, with the aim of optimizing the risk-benefit profile of the agent. Based on in vitro and in vivo findings and encouraging phase I tolerability data, a consecutive-day, twice-weekly dosing schedule was implemented early in the development program. Other phase II studies have led to further refinements in the dosing schedule of carfilzomib, resulting in the current approved schedule for carfilzomib to be administered intravenously over 2-10 min on 2 consecutive days each week for 3 weeks of a 28-day cycle. Prolonged infusion over 30 min has also been assessed in clinical studies to enable the use of higher carfilzomib doses with the aim of improving drug tolerability and efficacy. These data collectively informed the dosing and scheduling schemas for carfilzomib in ongoing trials, including phase I and II studies of combination regimens, and the randomized phase III trials ASPIRE, FOCUS, ENDEAVOR, and CLARION. Additional studies are underway to examine alternative dosing schedules (e.g., once-weekly dosing [CHAMPION-1]).

  5. Characterization by temperature-programmed reduction and by temperature-programmed oxidation (TPR-TPO) of chromium (III) oxide-based catalysts: Correlation with the catalytic activity for hydrofluoroalkane synthesis

    SciTech Connect

    Brunet, S.; Requieme, B.; Matouba, E.; Barrault, J.; Blanchard, M.

    1995-03-01

    The catalytic activity of chromium (III) oxide for the fluorination of CF{sub 3}CH{sub 2}Cl (HCFC 133a) is proportional to the number of reversibly oxidized sites. The proportionality coefficient depends on the atmosphere employed during the pretreatment of the catalyst. The temperature-programmed reduction and temperature-programmed oxidation experiments constitute a simple technique that allows the number of reversibly oxidized chromium atoms to be measured. The method of preparation of the chromium hydroxide has little effect on the catalytic properties of chromium (III) oxide. The activation atmosphere and the temperature are essential parameters in the formation of chromium (III) oxide from hydroxide. Indeed, the most active chromium (III) oxide for the fluorination of CF{sub 3}CH{sub 2}Cl is obtained by thermal treatment of hydroxide at 380{degrees}C under nitrogen. 20 refs., 5 figs., 4 tabs.

  6. Economic assessment of central cancer registry operations, Part III: Results from 5 programs.

    PubMed

    Tangka, Florence; Subramanian, Sujha; Beebe, Maggie Cole; Trebino, Diana; Michaud, Frances

    2010-01-01

    In this article, we report results from the cost analysis of 5 central cancer registries funded by the National Program of Cancer Registries (NPCR). To estimate the true economic costs of operating a cancer registry, we used a cost-assessment tool (CAT) to collect data on all registry activities, not just those funded by the NPCR. Data were collected on actual, rather than budgeted, expenditures, including personnel, consultants, information technology (IT) support, and other factors influencing costs. Factors that can affect registry costs include the amount of consolidation from abstract to incident cases, the method of data reporting, the number of edits that must be performed manually versus electronically, and the amount of interstate data exchange required of a registry. Expenditures were allocated to specific surveillance and data enhancement and analysis activities. Our study confirmed that cost per case varies across registry activities. The cost of surveillance activities per case ranges from $24.79 to $95.78 while the cost of data enhancement and analysis registry activities per reported cancer case ranges from $2.91 to $9.32. Total cost per reported cancer case also varies, ranging from $30 to slightly more than $100, with a median of $45.84. Further research using data from all NPCR-funded registries is required to assess reasons for this variation. Information gained from such an assessment will improve efficiency in registry operations and provide data to better quantify the funding requirements for expanding registry activities.

  7. Future aircraft networks and schedules

    NASA Astrophysics Data System (ADS)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  8. Tree Canopy Light Interception Estimates in Almond and a Walnut Orchards Using Ground, Low Flying Aircraft, and Satellite Based Methods to Improve Irrigation Scheduling Programs

    NASA Technical Reports Server (NTRS)

    Rosecrance, Richard C.; Johnson, Lee; Soderstrom, Dominic

    2016-01-01

    Canopy light interception is a main driver of water use and crop yield in almond and walnut production. Fractional green canopy cover (Fc) is a good indicator of light interception and can be estimated remotely from satellite using the normalized difference vegetation index (NDVI) data. Satellite-based Fc estimates could be used to inform crop evapotranspiration models, and hence support improvements in irrigation evaluation and management capabilities. Satellite estimates of Fc in almond and walnut orchards, however, need to be verified before incorporating them into irrigation scheduling or other crop water management programs. In this study, Landsat-based NDVI and Fc from NASA's Satellite Irrigation Management Support (SIMS) were compared with four estimates of canopy cover: 1. light bar measurement, 2. in-situ and image-based dimensional tree-crown analyses, 3. high-resolution NDVI data from low flying aircraft, and 4. orchard photos obtained via Google Earth and processed by an Image J thresholding routine. Correlations between the various estimates are discussed.

  9. Helping General Physical Educators and Adapted Physical Educators Address the Office of Civil Rights Dear Colleague Guidance Letter: Part III--Practitioners and Programs

    ERIC Educational Resources Information Center

    Poulin, David; Martinez, David; Aenchbacher, Amy; Aiello, Rocco; Doyle, Mike; Hilgenbrinck, Linda; Busse, Sean; Cappuccio, Jim

    2013-01-01

    In Part III of the feature, physical educators and adapted physical educators offer current best practices as models of implementation for readers. Contributions included are: (1) Answer to the Dear Colleague Letter from the Anchorage School District's Adapted Sport Program (David Poulin); (2) Georgia's Adapted Physical Educators Response to the…

  10. Simplifying Facility and Event Scheduling: Saving Time and Money.

    ERIC Educational Resources Information Center

    Raasch, Kevin

    2003-01-01

    Describes a product called the Event Management System (EMS), a computer software program to manage facility and event scheduling. Provides example of the school district and university uses of EMS. Describes steps in selecting a scheduling-management system. (PKP)

  11. SUPERSTARS III: K-2.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Education, Raleigh.

    SUPERSTARS III is a K-8 program designed as an enrichment opportunity for self-directed learners in mathematics. The basic purpose of SUPERSTARS III is to provide the extra challenge that self-motivated students need in mathematics and to do so in a structured, long-term program that does not impinge on the normal classroom routine or the…

  12. The Serendipitous Extragalactic X-Ray Source Identification (SEXSI) Program. III. Optical Spectroscopy

    NASA Astrophysics Data System (ADS)

    Eckart, Megan E.; Stern, Daniel; Helfand, David J.; Harrison, Fiona A.; Mao, Peter H.; Yost, Sarah A.

    2006-07-01

    We present the catalog of 477 spectra from the Serendipitous Extragalactic X-ray Source Identification (SEXSI) program, a survey designed to probe the dominant contributors to the 2-10 keV cosmic X-ray background. Our survey covers 1 deg2 of sky to 2-10 keV fluxes of 1×10-14 ergs cm-2 s-1, and 2 deg2 for fluxes of 3×10-14 ergs cm-2 s-1. Our spectra reach to R-band magnitudes of <~24 and have produced identifications and redshifts for 438 hard X-ray sources. Typical completeness levels in the 27 Chandra fields studied are 40%-70%. The vast majority of the 2-10 keV selected sample are active galactic nuclei (AGNs) with redshifts between 0.1 and 3; our highest redshift source lies at z=4.33. We find that few sources at z<1 have high X-ray luminosities, reflecting a dearth of high-mass, high-accretion-rate sources at low redshift, a result consistent with other recent wide-area surveys. We find that half of our sources show significant obscuration, with NH>1022 cm-2, independent of unobscured luminosity. We classify 168 sources as emission-line galaxies; all are X-ray-luminous (LX>1041 ergs s-1) objects with optical spectra lacking both high-ionization lines and evidence of a nonstellar continuum. The redshift distribution of these emission-line galaxies peaks at a significantly lower redshift than does that of the sources we spectroscopically identify as AGNs. We conclude that few of these sources, even at the low-luminosity end, can be powered by starburst activity. Stacking spectra for a subset of these sources in a similar redshift range, we detect [Ne V] λ3426 emission, a clear signature of AGN activity, confirming that the majority of these objects are Seyfert 2 galaxies in which the high-ionization lines are diluted by stellar emission. We find a total of 33 objects lacking broad lines in their optical spectra that have quasar X-ray luminosities (LX>1044 ergs s-1), the largest sample of such objects identified to date. In addition, we explore 17 AGNs

  13. Innovative integration of decommissioning and deactivation program with soil-groundwater clean up program has positive results on budget and schedule: a case study

    SciTech Connect

    Schappell, Bruce G.; Rucker, Gregory G.

    2007-07-01

    An innovative approach to integrate the activities of a decommissioning and deactivation program (D and D) with a soil-groundwater clean up program has had significant positive results saving both money and time at the Department of Energy's Savannah River Site. The accomplishments that have been achieved by the combining the two programs have been remarkable including significant cost savings, economies of scale for sampling and document generation, and alignment of common objectives. Because of the coordination of both activities area-wide 'end states' can be formulated and be consistent with the customers' cleanup goals and federal regulations. This coordinates and aligns both the environmental clean up and D and D objectives because each must be addressed simultaneously and comprehensively. In this respect, resources from both organizations can be pooled to take advantage of the strengths of each. The new approach allows more efficient use of lean financial resources and optimizes workforce activities to attain the common objectives while being more cost effective, more protective of the environment, and optimizing the use existing resources. (authors)

  14. Innovative Integration of Decommissioning and Deactivation Program with Soil-Groundwater Clean Up Program Has Positive Results on Budget and Schedule: A Case Study

    SciTech Connect

    Schappell, B; Rucker, G

    2007-07-25

    An innovative approach to integrate the activities of a decommissioning and deactivation program (D&D) with a soil-groundwater clean up program has had significant positive results saving both money and time at the Department of Energy's Savannah River Site. The accomplishments that have been achieved by the combining the two programs have been remarkable including significant cost savings, economies of scale for sampling and document generation, and alignment of common objectives. Because of the coordination of both activities area-wide ''end states'' can be formulated and be consistent with the customers' cleanup goals and federal regulations. This coordinates and aligns both the environmental clean up and D&D objectives because each must be addressed simultaneously and comprehensively. In this respect, resources from both organizations can be pooled to take advantage of the strengths of each. The new approach allows more efficient use of lean financial resources and optimizes workforce activities to attain the common objectives while being more cost effective, more protective of the environment, and optimizing the use existing resources.

  15. Schedule Analytics

    DTIC Science & Technology

    2016-04-30

    the Department of Defense (DoD) sources and the Office of Management and Budget (OMB) Information Technology (IT) Dashboard were data sources...identified and reviewed for this research. Based on the data source review, the study team determined that the Defense Acquisition Management Information...Analyst, The MITRE Corp. Thomas Fugate, Principal Acquisition and Program Management Analyst, The MITRE Corp. Published April 30, 2016 Approved for

  16. 33 CFR 242.6 - Fee schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... based on a Corps-wide average of estimated current costs for providing that level of service. (f) Review... most current cost data available. If necessary, the Fee Schedule will be revised after public notice... MANAGEMENT SERVICES PROGRAM ESTABLISHMENT OF FEES FOR COST RECOVERY § 242.6 Fee schedule. (a) General....

  17. 33 CFR 242.6 - Fee schedule.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... MANAGEMENT SERVICES PROGRAM ESTABLISHMENT OF FEES FOR COST RECOVERY § 242.6 Fee schedule. (a) General. The... Services requiring more than ten minutes and up to one work day to provide. The Fee Schedule has been... total costs for services provided to Federal agencies and private persons. (b) Level of effort....

  18. 6 CFR 27.210 - Submissions schedule.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Submissions schedule. 27.210 Section 27.210 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.210 Submissions schedule. (a) Initial Submission....

  19. 6 CFR 27.210 - Submissions schedule.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 6 Domestic Security 1 2012-01-01 2012-01-01 false Submissions schedule. 27.210 Section 27.210 Domestic Security DEPARTMENT OF HOMELAND SECURITY, OFFICE OF THE SECRETARY CHEMICAL FACILITY ANTI-TERRORISM STANDARDS Chemical Facility Security Program § 27.210 Submissions schedule. (a) Initial Submission....

  20. 40 CFR 52.240 - Compliance schedules.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Compliance schedules. 52.240 Section 52.240 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS California § 52.240 Compliance schedules. (a)...

  1. 49 CFR 665.21 - Scheduling.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... TRANSPORTATION BUS TESTING Operations § 665.21 Scheduling. (a) To schedule a bus for testing, a manufacturer shall contact the operator of FTA's bus testing program. Contact information and procedures are available on the operator's bus testing Web site, http://www.altoonabustest.com. (b) Upon contacting...

  2. 49 CFR 665.21 - Scheduling.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... TRANSPORTATION BUS TESTING Operations § 665.21 Scheduling. (a) To schedule a bus for testing, a manufacturer shall contact the operator of FTA's bus testing program. Contact information and procedures are available on the operator's bus testing Web site, http://www.altoonabustest.com. (b) Upon contacting...

  3. 49 CFR 665.21 - Scheduling.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... TRANSPORTATION BUS TESTING Operations § 665.21 Scheduling. (a) To schedule a bus for testing, a manufacturer shall contact the operator of FTA's bus testing program. Contact information and procedures are available on the operator's bus testing Web site, http://www.altoonabustest.com. (b) Upon contacting...

  4. 49 CFR 665.21 - Scheduling.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... TRANSPORTATION BUS TESTING Operations § 665.21 Scheduling. (a) To schedule a bus for testing, a manufacturer shall contact the operator of FTA's bus testing program. Contact information and procedures are available on the operator's bus testing Web site, http://www.altoonabustest.com. (b) Upon contacting...

  5. 49 CFR 665.21 - Scheduling.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... TRANSPORTATION BUS TESTING Operations § 665.21 Scheduling. (a) To schedule a bus for testing, a manufacturer shall contact the operator of FTA's bus testing program. Contact information and procedures are available on the operator's bus testing Web site, http://www.altoonabustest.com. (b) Upon contacting...

  6. 40 CFR 52.626 - Compliance schedules.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 3 2013-07-01 2013-07-01 false Compliance schedules. 52.626 Section 52.626 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.626 Compliance schedules. (a) (b)...

  7. 40 CFR 52.626 - Compliance schedules.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 3 2014-07-01 2014-07-01 false Compliance schedules. 52.626 Section 52.626 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.626 Compliance schedules. (a) (b)...

  8. 40 CFR 52.626 - Compliance schedules.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false Compliance schedules. 52.626 Section 52.626 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.626 Compliance schedules. (a) (b)...

  9. 40 CFR 52.626 - Compliance schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 3 2010-07-01 2010-07-01 false Compliance schedules. 52.626 Section 52.626 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.626 Compliance schedules. (a) (b)...

  10. 40 CFR 52.626 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false Compliance schedules. 52.626 Section 52.626 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.626 Compliance schedules. (a) (b)...

  11. 29 CFR 1952.361 - Developmental schedule.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS New Mexico § 1952.361 Developmental schedule. The New Mexico State Plan is developmental. The following is the developmental schedule as... Mexico Occupational Health and Safety Review Commission by January 31, 1976. (d) Enforcement program...

  12. 40 CFR 52.1482 - Compliance schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Compliance schedules. 52.1482 Section 52.1482 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Nevada § 52.1482 Compliance schedules....

  13. 40 CFR 52.1482 - Compliance schedules.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 4 2014-07-01 2014-07-01 false Compliance schedules. 52.1482 Section 52.1482 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Nevada § 52.1482 Compliance schedules....

  14. 40 CFR 52.1482 - Compliance schedules.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 4 2013-07-01 2013-07-01 false Compliance schedules. 52.1482 Section 52.1482 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Nevada § 52.1482 Compliance schedules....

  15. 40 CFR 52.1482 - Compliance schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Compliance schedules. 52.1482 Section 52.1482 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Nevada § 52.1482 Compliance schedules....

  16. Protocols for distributive scheduling

    NASA Technical Reports Server (NTRS)

    Richards, Stephen F.; Fox, Barry

    1993-01-01

    The increasing complexity of space operations and the inclusion of interorganizational and international groups in the planning and control of space missions lead to requirements for greater communication, coordination, and cooperation among mission schedulers. These schedulers must jointly allocate scarce shared resources among the various operational and mission oriented activities while adhering to all constraints. This scheduling environment is complicated by such factors as the presence of varying perspectives and conflicting objectives among the schedulers, the need for different schedulers to work in parallel, and limited communication among schedulers. Smooth interaction among schedulers requires the use of protocols that govern such issues as resource sharing, authority to update the schedule, and communication of updates. This paper addresses the development and characteristics of such protocols and their use in a distributed scheduling environment that incorporates computer-aided scheduling tools. An example problem is drawn from the domain of space shuttle mission planning.

  17. Job Scheduling Under the Portable Batch System

    NASA Technical Reports Server (NTRS)

    Henderson, Robert L.; Woodrow, Thomas S. (Technical Monitor)

    1995-01-01

    The typical batch queuing system schedules jobs for execution by a set of queue controls. The controls determine from which queues jobs may be selected. Within the queue, jobs are ordered first-in, first-run. This limits the set of scheduling policies available to a site. The Portable Batch System removes this limitation by providing an external scheduling module. This separate program has full knowledge of the available queued jobs, running jobs, and system resource usage. Sites are able to implement any policy expressible in one of several procedural language. Policies may range from "bet fit" to "fair share" to purely political. Scheduling decisions can be made over the full set of jobs regardless of queue or order. The scheduling policy can be changed to fit a wide variety of computing environments and scheduling goals. This is demonstrated by the use of PBS on an IBM SP-2 system at NASA Ames.

  18. Intellectual classification of Black and White children in special education programs using the WISC-III and the Cognitive Assessment System.

    PubMed

    Naglieri, J A; Rojahn, J

    2001-07-01

    The Wechsler Intelligence Scale for Children--Third Edition and the Cognitive Assessment System were compared for a sample of 78 White and Black students in special education programs for children with mental retardation. Results showed that the WISC-III identified more children as having mental retardation than did the Cognitive Assessment System. More important, however, the WISC-III classified disproportionately more Blacks than Whites as having mental retardation as compared to the Cognitive Assessment System. Results imply that the problem of disproportionate representation of Black children in special education classes for children with mental retardation may be addressed if the Cognitive Assessment System were used instead of the WISC-III.

  19. 40 CFR 141.702 - Sampling schedules.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 141.702 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Enhanced Treatment for Cryptosporidium Source Water Monitoring Requirements § 141.702 Sampling schedules. (a) Systems required to conduct source water...

  20. 40 CFR 141.702 - Sampling schedules.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 141.702 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Enhanced Treatment for Cryptosporidium Source Water Monitoring Requirements § 141.702 Sampling schedules. (a) Systems required to conduct source water...

  1. 40 CFR 141.702 - Sampling schedules.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 141.702 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Enhanced Treatment for Cryptosporidium Source Water Monitoring Requirements § 141.702 Sampling schedules. (a) Systems required to conduct source water...

  2. 40 CFR 141.702 - Sampling schedules.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 141.702 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Enhanced Treatment for Cryptosporidium Source Water Monitoring Requirements § 141.702 Sampling schedules. (a) Systems required to conduct source water...

  3. 40 CFR 141.702 - Sampling schedules.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 141.702 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) NATIONAL PRIMARY DRINKING WATER REGULATIONS Enhanced Treatment for Cryptosporidium Source Water Monitoring Requirements § 141.702 Sampling schedules. (a) Systems required to conduct source water...

  4. The Basic Program of Vocational Agriculture in Louisiana. Ag I and Ag II (9th and 10th Grades). Volume III. Bulletin 1690-III.

    ERIC Educational Resources Information Center

    Louisiana State Dept. of Education, Baton Rouge. Div. of Vocational Education.

    This curriculum guide, the third volume of the series, outlines the basic program of vocational agriculture for Louisiana students in the ninth and tenth grades. Covered in the five units on plant science are growth processes of plants, cultural practices for plants, insects affecting plants, seed and plant selection, and diseases that affect…

  5. Prevalence of Metabolic Syndrome among Korean Adolescents According to the National Cholesterol Education Program, Adult Treatment Panel III and International Diabetes Federation.

    PubMed

    Kim, Seonho; So, Wi-Young

    2016-10-01

    In both adults and children, metabolic syndrome (MetS) has been attributed to risk factors for type 2 diabetes and cardiovascular disease such as insulin resistance, abdominal obesity, hypertension, and dyslipidemia. This descriptive study aimed to compare the prevalence of MetS and diagnostic components according to the National Cholesterol Education Program, Adult Treatment Panel III (NCEP-ATP III) and International Diabetes Federation (IDF) in 2330 Korean adolescents (10-18 years), using data from the 2010-2012 Korea National Health and Nutrition Examination Survey-V. The NCEP-ATP III and IDF were used to diagnose MetS and yielded prevalence rates of 5.7% and 2.1%, respectively, with no sex-related differences. The most frequent MetS diagnostic components according to the NCEP-ATP III and IDF criteria were high triglyceride levels (21.2%) and low high-density lipoprotein cholesterol levels (13.6%), respectively; approximately 50.1% and 33.1% of adolescents had at least one MetS diagnostic component according to the respective criteria. Both overweight/obese male and female adolescents exhibited significantly increased prevalence rates of MetS and related diagnostic components, compared to normal-weight adolescents. In conclusion, the prevalence rates of MetS and diagnostic components differ according to the NCEP-ATP III and IDF criteria. Henceforth, efforts are needed to establish diagnostic criteria for Korean adolescents.

  6. Prevalence of Metabolic Syndrome among Korean Adolescents According to the National Cholesterol Education Program, Adult Treatment Panel III and International Diabetes Federation

    PubMed Central

    Kim, Seonho; So, Wi-Young

    2016-01-01

    In both adults and children, metabolic syndrome (MetS) has been attributed to risk factors for type 2 diabetes and cardiovascular disease such as insulin resistance, abdominal obesity, hypertension, and dyslipidemia. This descriptive study aimed to compare the prevalence of MetS and diagnostic components according to the National Cholesterol Education Program, Adult Treatment Panel III (NCEP-ATP III) and International Diabetes Federation (IDF) in 2330 Korean adolescents (10–18 years), using data from the 2010–2012 Korea National Health and Nutrition Examination Survey-V. The NCEP-ATP III and IDF were used to diagnose MetS and yielded prevalence rates of 5.7% and 2.1%, respectively, with no sex-related differences. The most frequent MetS diagnostic components according to the NCEP-ATP III and IDF criteria were high triglyceride levels (21.2%) and low high-density lipoprotein cholesterol levels (13.6%), respectively; approximately 50.1% and 33.1% of adolescents had at least one MetS diagnostic component according to the respective criteria. Both overweight/obese male and female adolescents exhibited significantly increased prevalence rates of MetS and related diagnostic components, compared to normal-weight adolescents. In conclusion, the prevalence rates of MetS and diagnostic components differ according to the NCEP-ATP III and IDF criteria. Henceforth, efforts are needed to establish diagnostic criteria for Korean adolescents. PMID:27706073

  7. Medicare program; end-stage renal disease prospective payment system and quality incentive program; ambulance fee schedule; durable medical equipment; and competitive acquisition of certain durable medical equipment prosthetics, orthotics and supplies. Final rule.

    PubMed

    2011-11-10

    This final rule updates and makes certain revisions to the End-Stage Renal Disease (ESRD) prospective payment system (PPS) for calendar year (CY) 2012. We are also finalizing the interim final rule with comment period published on April 6, 2011, regarding the transition budget-neutrality adjustment under the ESRD PPS,. This final rule also sets forth requirements for the ESRD quality incentive program (QIP) for payment years (PYs) 2013 and 2014. In addition, this final rule revises the ambulance fee schedule regulations to conform to statutory changes. This final rule also revises the definition of durable medical equipment (DME) by adding a 3-year minimum lifetime requirement (MLR) that must be met by an item or device in order to be considered durable for the purpose of classifying the item under the Medicare benefit category for DME. Finally, this final rule implements certain provisions of section 154 of the Medicare Improvements for Patients and Providers Act of 2008 (MIPPA) related to the durable medical equipment, prosthetics, orthotics and supplies (DMEPOS) Competitive Acquisition Program and responds to comments received on an interim final rule published January 16, 2009, that implemented these provisions of MIPPA effective April 18, 2009. (See the Table of Contents for a listing of the specific issues addressed in this final rule.)

  8. 76 FR 18457 - Regulatory Review Schedule; Tribal Consultation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-04

    ... which adequately protects the environment and the public health and safety.'' E. Buy Indian Act... National Indian Gaming Commission 25 CFR Chapter III Regulatory Review Schedule; Tribal Consultation AGENCY: National Indian Gaming Commission. ACTION: Notice of Regulatory Review Schedule. SUMMARY: On November...

  9. Environmental surveillance master sampling schedule

    SciTech Connect

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington.

  10. Essential Components of Educational Programs on Biomedical Writing, Editing, and Publishing.

    PubMed

    Barroga, Edward; Vardaman, Maya

    2015-10-01

    The primary objective of educational programs on biomedical writing, editing, and publishing is to nurture ethical skills among local and international researchers and editors from diverse professional backgrounds. The mechanics, essential components, and target outcomes of these programs are described in this article. The mechanics covers the objectives, design, benefits, duration, participants and qualifications, program formats, administrative issues, and mentorship. The essential components consist of three core schedules: Schedule I Basic aspects of biomedical writing, editing, and communications; Schedule II Essential skills in biomedical writing, editing, and publishing; and Schedule III Interactive lectures on relevant topics. The target outcomes of the programs comprise knowledge acquisition, skills development, paper write-up, and journal publication. These programs add to the prestige and academic standing of the host institutions.

  11. Environmental surveillance master sampling schedule

    SciTech Connect

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  12. Gang scheduling a parallel machine. Revision 1

    SciTech Connect

    Gorda, B.C.; Brooks, E.D. III

    1991-12-01

    Program development on parallel machines can be a nightmare of scheduling headaches. We have developed a portable time sharing mechanism to handle the problem of scheduling gangs of processes. User programs and their gangs of processes are put to sleep and awakened by the gang scheduler to provide a time sharing environment. Time quantum are adjusted according to priority queues and a system of fair share accounting. The initial platform for this software is the 128 processor BBN TC2000 in use in the Massively Parallel Computing Initiative at the Lawrence Livermore National Laboratory.

  13. Space communications scheduler: A rule-based approach to adaptive deadline scheduling

    NASA Technical Reports Server (NTRS)

    Straguzzi, Nicholas

    1990-01-01

    Job scheduling is a deceptively complex subfield of computer science. The highly combinatorial nature of the problem, which is NP-complete in nearly all cases, requires a scheduling program to intelligently transverse an immense search tree to create the best possible schedule in a minimal amount of time. In addition, the program must continually make adjustments to the initial schedule when faced with last-minute user requests, cancellations, unexpected device failures, quests, cancellations, unexpected device failures, etc. A good scheduler must be quick, flexible, and efficient, even at the expense of generating slightly less-than-optimal schedules. The Space Communication Scheduler (SCS) is an intelligent rule-based scheduling system. SCS is an adaptive deadline scheduler which allocates modular communications resources to meet an ordered set of user-specified job requests on board the NASA Space Station. SCS uses pattern matching techniques to detect potential conflicts through algorithmic and heuristic means. As a result, the system generates and maintains high density schedules without relying heavily on backtracking or blind search techniques. SCS is suitable for many common real-world applications.

  14. 49 CFR 237.101 - Scheduling of bridge inspections.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 4 2013-10-01 2013-10-01 false Scheduling of bridge inspections. 237.101 Section... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.101 Scheduling of bridge inspections. (a) Each bridge management program shall include a provision for scheduling...

  15. 49 CFR 237.101 - Scheduling of bridge inspections.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 4 2014-10-01 2014-10-01 false Scheduling of bridge inspections. 237.101 Section... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.101 Scheduling of bridge inspections. (a) Each bridge management program shall include a provision for scheduling...

  16. 49 CFR 237.101 - Scheduling of bridge inspections.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 4 2012-10-01 2012-10-01 false Scheduling of bridge inspections. 237.101 Section... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.101 Scheduling of bridge inspections. (a) Each bridge management program shall include a provision for scheduling...

  17. 49 CFR 237.101 - Scheduling of bridge inspections.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Scheduling of bridge inspections. 237.101 Section... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Bridge Inspection § 237.101 Scheduling of bridge inspections. (a) Each bridge management program shall include a provision for scheduling...

  18. Flexibility for Vocational Education Through Computer Scheduling. Final Report.

    ERIC Educational Resources Information Center

    Oakford, Robert V.; Allen, Dwight W.

    In 1965, a 3-year developmental program was begun to determine the desirability of modular scheduling for comprehensive and vocational schools and to investigate the impact of such scheduling on 18 secondary schools. During this time more than 15,000,000 data were provided by the schools. The Stanford School Scheduling System, a computer program…

  19. Dedicated heterogeneous node scheduling including backfill scheduling

    DOEpatents

    Wood, Robert R.; Eckert, Philip D.; Hommes, Gregg

    2006-07-25

    A method and system for job backfill scheduling dedicated heterogeneous nodes in a multi-node computing environment. Heterogeneous nodes are grouped into homogeneous node sub-pools. For each sub-pool, a free node schedule (FNS) is created so that the number of to chart the free nodes over time. For each prioritized job, using the FNS of sub-pools having nodes useable by a particular job, to determine the earliest time range (ETR) capable of running the job. Once determined for a particular job, scheduling the job to run in that ETR. If the ETR determined for a lower priority job (LPJ) has a start time earlier than a higher priority job (HPJ), then the LPJ is scheduled in that ETR if it would not disturb the anticipated start times of any HPJ previously scheduled for a future time. Thus, efficient utilization and throughput of such computing environments may be increased by utilizing resources otherwise remaining idle.

  20. Scheduling Coast Guard District Cutters

    DTIC Science & Technology

    1992-09-01

    2G, B-2NY, B-2SAR, C); t - week the cutter assumes the patrol status. COSTO - cost of scheduling cutter i to patrol k; ( 1 if ship i is available for...29262a tII 1 ’• l1 1i ,1111’Iii 1 l l H I ,,,,,,,•~II ,, I.,,,.,,_ I 111 ............ ll Unclassified SECURITY CLASSIFICATION OF THIS PAGE REPORT...Postgraduate School (If applicable) Naval Postgraduate School 1 55 6c. ADDRESS (City, State, and ZIP Code) 7b. ADDRESS (City, State, and ZIP Code) Monterey

  1. Class Schedules Need Class.

    ERIC Educational Resources Information Center

    Monfette, Ronald J.

    1986-01-01

    Argues that college publications, including class schedules, must be accurate, timely, and easy to read and follow. Describes Schoolcraft College's unified format approach to publications marketing. Offers suggestions on the design, format, and distribution of class schedules. (DMM)

  2. Immunization Schedules for Adults

    MedlinePlus

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedules for Adults in Easy-to-read Formats ... previous immunizations. View or Print a Schedule Recommended Immunizations for Adults (19 Years and Older) by Age ...

  3. Instant Childhood Immunization Schedule

    MedlinePlus

    ... Recommendations Why Immunize? Vaccines: The Basics Instant Childhood Immunization Schedule Recommend on Facebook Tweet Share Compartir Get ... date. See Disclaimer for additional details. Based on Immunization Schedule for Children 0 through 6 Years of ...

  4. School Construction Scheduling.

    ERIC Educational Resources Information Center

    Delaney, J. B.

    1983-01-01

    Explains that favorable market and working conditions influence the scheduling of school construction projects. Facility planners, architects, and contractors are advised to develop a realistic time schedule for the entire project. (MLF)

  5. Introduction of Sequential Inactivated Polio Vaccine–Oral Polio Vaccine Schedule for Routine Infant Immunization in Brazil’s National Immunization Program

    PubMed Central

    Domingues, Carla Magda Allan S.; de Fátima Pereira, Sirlene; Marreiros, Ana Carolina Cunha; Menezes, Nair; Flannery, Brendan

    2015-01-01

    In August 2012, the Brazilian Ministry of Health introduced inactivated polio vaccine (IPV) as part of sequential polio vaccination schedule for all infants beginning their primary vaccination series. The revised childhood immunization schedule included 2 doses of IPV at 2 and 4 months of age followed by 2 doses of oral polio vaccine (OPV) at 6 and 15 months of age. One annual national polio immunization day was maintained to provide OPV to all children aged 6 to 59 months. The decision to introduce IPV was based on preventing rare cases of vaccine-associated paralytic polio, financially sustaining IPV introduction, ensuring equitable access to IPV, and preparing for future OPV cessation following global eradication. Introducing IPV during a national multivaccination campaign led to rapid uptake, despite challenges with local vaccine supply due to high wastage rates. Continuous monitoring is required to achieve high coverage with the sequential polio vaccine schedule. PMID:25316829

  6. Medicare Program; Revisions to Payment Policies Under the Physician Fee Schedule and Other Revisions to Part B for CY 2017; Medicare Advantage Bid Pricing Data Release; Medicare Advantage and Part D Medical Loss Ratio Data Release; Medicare Advantage Provider Network Requirements; Expansion of Medicare Diabetes Prevention Program Model; Medicare Shared Savings Program Requirements. Final rule.

    PubMed

    2016-11-15

    This major final rule addresses changes to the physician fee schedule and other Medicare Part B payment policies, such as changes to the Value Modifier, to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services, as well as changes in the statute. This final rule also includes changes related to the Medicare Shared Savings Program, requirements for Medicare Advantage Provider Networks, and provides for the release of certain pricing data from Medicare Advantage bids and of data from medical loss ratio reports submitted by Medicare health and drug plans. In addition, this final rule expands the Medicare Diabetes Prevention Program model.

  7. AVLIS production plant project schedule and milestones

    SciTech Connect

    Not Available

    1984-11-15

    An AVLIS Production Plant Deployment Schedule for the engineering, procurement, and construction for both the Initial Increment of Production and the fully Activated Plant, has been developed by the project team consisting of Lawrence Livermore National Laboratory, Martin Marietta Energy Systems, Inc. with architect-engineer support from Bechtel National, Inc., Stone and Webster Engineering Corporation, and Westinghouse Corporation. The initial deployment phase consists of six separators modules and the three laser power amplifier modules consistent with the FY84 reference design with a name plate capacity of 5 million separative work units/yr followed by a full plant activation to approximately 13 million separative work units/yr. The AVLIS Production Plant project team's strategy for deployment schedule analysis focused on three schedule options: engineering limited schedule; authorization limited schedule; and funding limited project schedule. The three deployment schedule options developed by AVLIS project team have been classified in ranges such as an optimistic, rapid/moderate, or moderate/pessimistic based on the probability of meeting the individual schedule option's major milestones or program objectives of enriching uranium by the AVLIS process in an effective cost and schedule manner. 47 figures, 7 tables.

  8. Schedule Risk Assessment

    NASA Technical Reports Server (NTRS)

    Smith, Greg

    2003-01-01

    Schedule Risk Assessment needs to determine the probability of finishing on or before a given point in time. Task in a schedule should reflect the "most likely" duration for each task. IN reality, each task is different and has a varying degree of probability of finishing within or after the duration specified. Schedule risk assessment attempt to quantify these probabilities by assigning values to each task. Bridges the gap between CPM scheduling and the project's need to know the likelihood of "when".

  9. Reinforcement learning in scheduling

    NASA Technical Reports Server (NTRS)

    Dietterich, Tom G.; Ok, Dokyeong; Zhang, Wei; Tadepalli, Prasad

    1994-01-01

    The goal of this research is to apply reinforcement learning methods to real-world problems like scheduling. In this preliminary paper, we show that learning to solve scheduling problems such as the Space Shuttle Payload Processing and the Automatic Guided Vehicle (AGV) scheduling can be usefully studied in the reinforcement learning framework. We discuss some of the special challenges posed by the scheduling domain to these methods and propose some possible solutions we plan to implement.

  10. Web Publishing Schedule

    EPA Pesticide Factsheets

    Section 207(f)(2) of the E-Gov Act requires federal agencies to develop an inventory and establish a schedule of information to be published on their Web sites, make those schedules available for public comment. To post the schedules on the web site.

  11. The Probability of Small Schedule Values and Preference for Random-Interval Schedules

    ERIC Educational Resources Information Center

    Soreth, Michelle Ennis; Hineline, Philip N.

    2009-01-01

    Preference for working on variable schedules and temporal discrimination were simultaneously examined in two experiments using a discrete-trial, concurrent-chains arrangement with fixed interval (FI) and random interval (RI) terminal links. The random schedule was generated by first sampling a probability distribution after the programmed delay to…

  12. Medicare program; reissuance of the wage index in the 1981 schedule of limits on hospital per diem inpatient general routine operating costs--HCFA. Proposed notice.

    PubMed

    1984-02-17

    We are reissuing for public comment the change in the types of data that were used to calculate the wage index that was contained in the schedules of limits on hospital per diem inpatient general routine operating costs reimbursable under Medicare that were applicable to cost reporting periods beginning on or after July 1, 1981 and for cost reporting periods ending after September 30, 1981. The cost limits for cost reporting periods beginning on or after October 1, 1982 are governed by the notice published in the Federal Register on September 30, 1982 (47 FR 43296) and August 30, 1983 (48 FR 39426) and are not affected by this reissuance. The wage index was originally issued as part of the schedule of limits published on June 30, 1981 (46 FR 33637) and September 30, 1981 (46 FR 48010) and is being reissued as the result of the April 29, 1983 decision of the United States District Court for the District of Columbia in the case of District of Columbia Hospital Association, et al. v Heckler, et al. (No. 82-2520 DDC). The District Court held that the 1981 schedule of hospital cost limits was invalid for failure to comply with the Administrative Procedure Act insofar as the schedule incorporated or was formulated by using a wage index that was calculated by excluding Federal government hospital wage data.

  13. Medicare program; reissuance of the wage index in the 1981 schedule of limits on hospital per diem inpatient general routine operating costs--HCFA. Final notice.

    PubMed

    1984-11-26

    This notice affirms the use of the wage index that was used to calculate the 1981 schedule of limits on hospital per diem inpatient general routine operating costs, which was issued on June 30, 1981 [46 FR 33637], and September 30, 1981 [46 FR 48010]. The 1981 wage index was reissued for public comment on February 17, 1984 [49 FR 6175].

  14. Global Positioning System III (GPS III)

    DTIC Science & Technology

    2015-12-01

    from the SV Bus, specifically the Scalable Power Regulation Unit and is being amplified by the solar arrays which act as highly efficient antennas. To...Military Operations in Urban Terrain; Defense-Wide Mission Support; Air Mobility; and Space Launch Orbital Support. For military users, the GPS III...Service: The GPS III program will provide O&S for on- orbit support through the Launch and On- Orbit Support contract. For Space Vehicle (SV)01 and

  15. NASA Instrument Cost/Schedule Model

    NASA Technical Reports Server (NTRS)

    Habib-Agahi, Hamid; Mrozinski, Joe; Fox, George

    2011-01-01

    NASA's Office of Independent Program and Cost Evaluation (IPCE) has established a number of initiatives to improve its cost and schedule estimating capabilities. 12One of these initiatives has resulted in the JPL developed NASA Instrument Cost Model. NICM is a cost and schedule estimator that contains: A system level cost estimation tool; a subsystem level cost estimation tool; a database of cost and technical parameters of over 140 previously flown remote sensing and in-situ instruments; a schedule estimator; a set of rules to estimate cost and schedule by life cycle phases (B/C/D); and a novel tool for developing joint probability distributions for cost and schedule risk (Joint Confidence Level (JCL)). This paper describes the development and use of NICM, including the data normalization processes, data mining methods (cluster analysis, principal components analysis, regression analysis and bootstrap cross validation), the estimating equations themselves and a demonstration of the NICM tool suite.

  16. Routine Operational Environmental Monitoring schedule, CY 1994

    SciTech Connect

    Schmidt, J.W.

    1993-12-01

    This document provides Health Physics (HP) a schedule in accordance with the Environmental Compliance Manual, WHC-CM-7-5, of monitoring and sampling routines for the Operational Environmental Monitoring (OEM) Program during calendar year (CY) 1994. The survey frequencies for particular sites are determined by the technical judgment of EES and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive waste sites are scheduled to be surveyed annually at a minimum. Any newly discovered waste sites not documented by this schedule will be included in the revised schedule for CY 1995. This schedule does not discuss the manpower needs nor does it list the monitoring equipment to be used in completing specific routines.

  17. NASA scheduling technologies

    NASA Technical Reports Server (NTRS)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  18. 40 CFR 147.2250 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... for Class I, III, IV, and V wells in the State of Utah, except those on Indian lands, is administered... of the Federal Register on June 25, 1984. (1) Utah Water Pollution Control Act, Utah Code Annotated... Executive Secretary of Utah Water Pollution Control Committee on August 16, 1990). (b) Other laws....

  19. A scheduling model for astronomy

    NASA Astrophysics Data System (ADS)

    Solar, M.; Michelon, P.; Avarias, J.; Garces, M.

    2016-04-01

    Astronomical scheduling problem has several external conditions that change dynamically at any time during observations, like weather condition (humidity, temperature, wind speed, opacity, etc.), and target visibility conditions (target over the horizon, Sun/Moon blocking the target). Therefore, a dynamic re-scheduling is needed. An astronomical project will be scheduled as one or more Scheduling Blocks (SBs) as an atomic unit of astronomical observations. We propose a mixed integer linear programming (MILP) solution to select the best SBs, favors SBs with high scientific values, and thus maximizing the quantity of completed observation projects. The data content of Atacama Large Millimeter/Submillimeter Array (ALMA) projects of cycle 0 and cycle 1 were analyzed, and a synthetic set of tests of the real instances was created. Two configurations, one of 5000 SBs in a 3 months season and another 10,000 SBs a 6 months season were created. These instances were evaluated with excellent results. Through the testing it is showed that the MILP proposal has optimal solutions.

  20. Integrated resource scheduling in a distributed scheduling environment

    NASA Technical Reports Server (NTRS)

    Zoch, David; Hall, Gardiner

    1988-01-01

    The Space Station era presents a highly-complex multi-mission planning and scheduling environment exercised over a highly distributed system. In order to automate the scheduling process, customers require a mechanism for communicating their scheduling requirements to NASA. A request language that a remotely-located customer can use to specify his scheduling requirements to a NASA scheduler, thus automating the customer-scheduler interface, is described. This notation, Flexible Envelope-Request Notation (FERN), allows the user to completely specify his scheduling requirements such as resource usage, temporal constraints, and scheduling preferences and options. The FERN also contains mechanisms for representing schedule and resource availability information, which are used in the inter-scheduler inconsistency resolution process. Additionally, a scheduler is described that can accept these requests, process them, generate schedules, and return schedule and resource availability information to the requester. The Request-Oriented Scheduling Engine (ROSE) was designed to function either as an independent scheduler or as a scheduling element in a network of schedulers. When used in a network of schedulers, each ROSE communicates schedule and resource usage information to other schedulers via the FERN notation, enabling inconsistencies to be resolved between schedulers. Individual ROSE schedules are created by viewing the problem as a constraint satisfaction problem with a heuristically guided search strategy.

  1. Intelligent scheduling support for the US Coast Guard

    SciTech Connect

    Darby-Dowman, K.; Lucas, C.; Mitra, G.; Fink, R.; Kingsley, L.; Smith, J.W.

    1992-12-31

    This paper will discuss a joint effort by the U.S. Coast Guard Research & Development Center, Idaho National Engineering Laboratory and Brunel University to provide the necessary tools to increase the human scheduler`s capability to handle the scheduling process more efficiently and effectively. Automating the scheduling process required a system that could think independently of the scheduler, that is, the systems needed its own control mechanism and knowledge base. Further, automated schedule generation became a design requirement and sophisticated algorithms were formulated to solve a complex combinatorial problem. In short, the resulting design can be viewed as a hybrid knowledge-based mathematical programming application system. This document contains an overview of the integrated system, a discrete optimization model for scheduling, and schedule diagnosis and analysis.

  2. The Composition of the Master Schedule

    NASA Technical Reports Server (NTRS)

    Thomas, Cynthia C.; Behrend, Dirk; MacMillan, Daniel S.

    2010-01-01

    Over a period of about four months, the IVS Coordinating Center (IVSCC) each year composes the Master Schedule for the IVS observing program of the next calendar year. The process begins in early July when the IVSCC contacts the IVS Network Stations to request information about available station time as well as holiday and maintenance schedules for the upcoming year. Going through various planning stages and a review process with the IVS Observing Program Committee (OPC), the final version of the Master Schedule is posted by early November. We describe the general steps of the composition and illustrate them with the example of the planning for the Master Schedule of the 2010 observing year.

  3. 76 FR 77895 - Schedules of Controlled Substances: Placement of Ezogabine Into Schedule V

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-15

    ... 235. Thus, pregabalin was placed into Schedule V based both on abuse-related human and animal data.... Given that ezogabine has abuse-related human and animal data in its NDA file similar to the data... Authority The DEA implements and enforces Titles II and III of the Comprehensive Drug Abuse Prevention...

  4. Environmental surveillance master sampling schedule

    SciTech Connect

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  5. Naval Postgraduate School Scheduling System (NPS3)

    DTIC Science & Technology

    1992-09-01

    reverse if necessary andidentify by block number) FIELD I GROUP ISUBGROUP Schedules; Scheduling; Sysstems Analysis and Design; Structured Analysis...file formats facilitating the importation of data from other programs, foreign files or databases (Blyth Software, 1990). Omnis 7’s database engine ...Expert, v6, n9, pp. 32-39, September 1991. Hass, M.S. and Hochstetler, M.L., Information Engineering of the Curricular Officer’s Segment of a Unified

  6. Automated telescope scheduling

    NASA Technical Reports Server (NTRS)

    Johnston, Mark D.

    1988-01-01

    With the ever increasing level of automation of astronomical telescopes the benefits and feasibility of automated planning and scheduling are becoming more apparent. Improved efficiency and increased overall telescope utilization are the most obvious goals. Automated scheduling at some level has been done for several satellite observatories, but the requirements on these systems were much less stringent than on modern ground or satellite observatories. The scheduling problem is particularly acute for Hubble Space Telescope: virtually all observations must be planned in excruciating detail weeks to months in advance. Space Telescope Science Institute has recently made significant progress on the scheduling problem by exploiting state-of-the-art artificial intelligence software technology. What is especially interesting is that this effort has already yielded software that is well suited to scheduling groundbased telescopes, including the problem of optimizing the coordinated scheduling of more than one telescope.

  7. 28 CFR 548.13 - Schedules and facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... RELIGIOUS PROGRAMS Religious Beliefs and Practices of Committed Offenders § 548.13 Schedules and facilities...'s religious activities. (b) The Warden may relieve an inmate from an institution program or assignment if a religious activity is also scheduled at that time. (c) Institutions shall have...

  8. 28 CFR 548.13 - Schedules and facilities.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... RELIGIOUS PROGRAMS Religious Beliefs and Practices of Committed Offenders § 548.13 Schedules and facilities...'s religious activities. (b) The Warden may relieve an inmate from an institution program or assignment if a religious activity is also scheduled at that time. (c) Institutions shall have...

  9. 40 CFR 144.53 - Schedule of compliance.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 24 2013-07-01 2013-07-01 false Schedule of compliance. 144.53 Section 144.53 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM Permit Conditions § 144.53 Schedule of compliance. (a) General....

  10. 40 CFR 144.53 - Schedule of compliance.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 23 2014-07-01 2014-07-01 false Schedule of compliance. 144.53 Section 144.53 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM Permit Conditions § 144.53 Schedule of compliance. (a) General....

  11. 40 CFR 144.53 - Schedule of compliance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Schedule of compliance. 144.53 Section 144.53 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM Permit Conditions § 144.53 Schedule of compliance. (a) General....

  12. 40 CFR 144.53 - Schedule of compliance.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 23 2011-07-01 2011-07-01 false Schedule of compliance. 144.53 Section 144.53 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM Permit Conditions § 144.53 Schedule of compliance. (a) General....

  13. 40 CFR 144.53 - Schedule of compliance.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 24 2012-07-01 2012-07-01 false Schedule of compliance. 144.53 Section 144.53 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM Permit Conditions § 144.53 Schedule of compliance. (a) General....

  14. Planning a Shared-Schedule Residency.

    ERIC Educational Resources Information Center

    Chamberlin, Patricia A.; Jones, Mary D.

    1980-01-01

    The details of a shared-schedule residency program in the Department of Pediatrics of the University of Texas Medical Branch at Galveston are reviewed. Problems encountered are presented along with suggestions for their alleviation and the benefits of the job-sharing are discussed. Guidelines for planning such a program are offered. (Author/JMD)

  15. Schedule and status of irradiation experiments

    SciTech Connect

    Rowcliffe, A.F.; Grossbeck, M.L.

    1997-04-01

    To provide an updated summary of the status of irradiation experiments for the neutron-interactive materials program. The current status of reactor irradiation experiments is presented in tables summarizing the experimental objectives, conditions, and schedule. Currently, the program has two irradiation experiments in reactor; and 8 experiments in the planning or design stages. Postirradiation examination and testing is in progress on 18 experiments.

  16. Medicare program; revisions to payment policies under the physician fee schedule, and other Part B payment policies for CY 2008; revisions to the payment policies of ambulance services under the ambulance fee schedule for CY 2008; and the amendment of the e-prescribing exemption for computer generated facsimile transmissions. Final rule with comment period.

    PubMed

    2007-11-27

    This final rule with comment period addresses certain provisions of the Tax Relief and Health Care Act of 2006, as well as making other proposed changes to Medicare Part B payment policy. We are making these changes to ensure that our payment systems are updated to reflect changes in medical practice and the relative value of services. This final rule with comment period also discusses refinements to resource-based practice expense (PE) relative value units (RVUs); geographic practice cost indices (GPCI) changes; malpractice RVUs; requests for additions to the list of telehealth services; several coding issues including additional codes from the 5-Year Review; payment for covered outpatient drugs and biologicals; the competitive acquisition program (CAP); clinical lab fee schedule issues; payment for renal dialysis services; performance standards for independent diagnostic testing facilities; expiration of the physician scarcity area (PSA) bonus payment; conforming and clarifying changes for comprehensive outpatient rehabilitation facilities (CORFs); a process for updating the drug compendia; physician self referral issues; beneficiary signature for ambulance transport services; durable medical equipment (DME) update; the chiropractic services demonstration; a Medicare economic index (MEI) data change; technical corrections; standards and requirements related to therapy services under Medicare Parts A and B; revisions to the ambulance fee schedule; the ambulance inflation factor for CY 2008; and amending the e-prescribing exemption for computer-generated facsimile transmissions. We are also finalizing the calendar year (CY) 2007 interim RVUs and are issuing interim RVUs for new and revised procedure codes for CY 2008. As required by the statute, we are announcing that the physician fee schedule update for CY 2008 is -10.1 percent, the initial estimate for the sustainable growth rate for CY 2008 is -0.1 percent, and the conversion factor (CF) for CY 2008 is $34.0682.

  17. Mixed-Integer Formulations for Constellation Scheduling

    NASA Astrophysics Data System (ADS)

    Valicka, C.; Hart, W.; Rintoul, M.

    Remote sensing systems have expanded the set of capabilities available for and critical to national security. Cooperating, high-fidelity sensing systems and growing mission applications have exponentially increased the set of potential schedules. A definitive lack of advanced tools places an increased burden on operators, as planning and scheduling remain largely manual tasks. This is particularly true in time-critical planning activities where operators aim to accomplish a large number of missions through optimal utilization of single or multiple sensor systems. Automated scheduling through identification and comparison of alternative schedules remains a challenging problem applicable across all remote sensing systems. Previous approaches focused on a subset of sensor missions and do not consider ad-hoc tasking. We have begun development of a robust framework that leverages the Pyomo optimization modeling language for the design of a tool to assist sensor operators planning under the constraints of multiple concurrent missions and uncertainty. Our scheduling models have been formulated to address the stochastic nature of ad-hoc tasks inserted under a variety of scenarios. Operator experience is being leveraged to select appropriate model objectives. Successful development of the framework will include iterative development of high-fidelity mission models that consider and expose various schedule performance metrics. Creating this tool will aid time-critical scheduling by increasing planning efficiency, clarifying the value of alternative modalities uniquely provided by multi-sensor systems, and by presenting both sets of organized information to operators. Such a tool will help operators more quickly and fully utilize sensing systems, a high interest objective within the current remote sensing operations community. Preliminary results for mixed-integer programming formulations of a sensor scheduling problem will be presented. Assumptions regarding sensor geometry

  18. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    NASA Technical Reports Server (NTRS)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  19. LDRD Report: Scheduling Irregular Algorithms

    SciTech Connect

    Boman, Erik G.

    2014-10-01

    This LDRD project was a campus exec fellowship to fund (in part) Donald Nguyen’s PhD research at UT-Austin. His work has focused on parallel programming models, and scheduling irregular algorithms on shared-memory systems using the Galois framework. Galois provides a simple but powerful way for users and applications to automatically obtain good parallel performance using certain supported data containers. The naïve user can write serial code, while advanced users can optimize performance by advanced features, such as specifying the scheduling policy. Galois was used to parallelize two sparse matrix reordering schemes: RCM and Sloan. Such reordering is important in high-performance computing to obtain better data locality and thus reduce run times.

  20. Classroom Breakfast Scores High in Maryland: Findings from Year III of the Maryland Meals for Achievement Classroom Breakfast Pilot Program.

    ERIC Educational Resources Information Center

    Maryland State Dept. of Education, Baltimore.

    In fall 1998, the Maryland State Department of Education and six schools began a pilot program to evaluate the impact of serving breakfast to students in the classroom as part of the school day. Students in participating schools have an opportunity to eat breakfast in their classroom each day at no charge, regardless of family income. The program,…

  1. School Community Education Program in New York City 1988-89. Volume III. OREA Evaluation Section Report.

    ERIC Educational Resources Information Center

    Guerrero, Frank; Abbott, Lori

    This third volume of a four-volume evaluation of the 1988-89 New York City School Community Education Program (also known as the Umbrella Program) comprises reports evaluating seven innovative staff development and five curriculum development projects. Evaluation sources included student preprogram and postprogram test outcomes, writing samples,…

  2. 40 CFR 147.2650 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...), approved by the EPA pursuant to the Safe Drinking Water Act (SDWA) section 1422. This program consists of... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION... Environmental Act (PRPPE), Title 12 Laws of Puerto Rico Annotated (LPRA) Chapters 121 and 131, 1977 edition,...

  3. 40 CFR 147.2650 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...), approved by the EPA pursuant to the Safe Drinking Water Act (SDWA) section 1422. This program consists of... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION... Environmental Act (PRPPE), Title 12 Laws of Puerto Rico Annotated (LPRA) Chapters 121 and 131, 1977 edition,...

  4. 40 CFR 147.2650 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...), approved by the EPA pursuant to the Safe Drinking Water Act (SDWA) section 1422. This program consists of... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION... Environmental Act (PRPPE), Title 12 Laws of Puerto Rico Annotated (LPRA) Chapters 121 and 131, 1977 edition,...

  5. 40 CFR 147.2650 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...), approved by the EPA pursuant to the Safe Drinking Water Act (SDWA) section 1422. This program consists of... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION... Environmental Act (PRPPE), Title 12 Laws of Puerto Rico Annotated (LPRA) Chapters 121 and 131, 1977 edition,...

  6. 40 CFR 147.2650 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...), approved by the EPA pursuant to the Safe Drinking Water Act (SDWA) section 1422. This program consists of... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION... Environmental Act (PRPPE), Title 12 Laws of Puerto Rico Annotated (LPRA) Chapters 121 and 131, 1977 edition,...

  7. Chemistry - Part III, An Introduction to Organic Chemistry: Student Workbook for the Thirteen-College Curriculum Program.

    ERIC Educational Resources Information Center

    Booker, Edward; And Others

    This booklet is a student manual in a series of booklets that make up the core of a Physical Science course designed for the freshman year of college and used by teachers in the 27 colleges participating in the Thirteen College curriculum Program. This program is a curriculum revision project in support of 13 predominantly Negro colleges and…

  8. Chemistry - Part III, An Introduction to Organic Chemistry: Teacher's Curriculum Guide for the Thirteen-College Curriculum Program.

    ERIC Educational Resources Information Center

    Booker, Edward; And Others

    This booklet is a teacher's manual in a series of booklets that make up the core of a Physical Science course designed for the freshman year of college and used by teachers in the Thirteen College Curriculum Program. This program is a curriculum revision project in support of 13 predominantly Negro colleges and reflects educational research in the…

  9. 76 FR 77982 - Applications for Eligibility Designation; Programs Under Parts A and F of Title III of the Higher...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-15

    ... (FSEOG), the Federal Work Study (FWS), the Student Support Services (SSS), or the Undergraduate... Part A, Title IV of the HEA; the FWS program in section 443 of Part C, Title IV of the HEA; the SSS..., SSS, and UISFL programs is valid for five consecutive years. You will not need to reapply...

  10. 77 FR 67805 - Applications for Eligibility Designation; Programs Under Parts A and F of Title III of the Higher...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-14

    ... (FSEOG), the Federal Work Study (FWS), the Student Support Services (SSS), or the Undergraduate... Part A, Title IV of the HEA; the FWS program in section 443 of Part C, Title IV of the HEA; the SSS..., SSS, and UISFL programs is valid for five consecutive years. You will not need to reapply...

  11. Curriculum Development and Evaluation: Research and Development Program on Preschool Disadvantaged Children. Final Report. (Volume II of III Volumes).

    ERIC Educational Resources Information Center

    Bereiter, Carl; And Others

    Seven studies were undertaken to further extend the development and testing of an academically-oriented preschool program for disadvantaged children. The studies investigated (1) Curricula Development and Testing in Bereiter-Engelmann Program, (2) Dual Kindergarten, (3) Follow-Up Data on the Achievement of Disadvantaged Children Who Participated…

  12. Evaluation of Flexibility Under "No Child Left Behind": Volume III--The Rural Education Achievement Program (REAP Flex)

    ERIC Educational Resources Information Center

    Christensen, Gayle S.; Amerikaner, Ary; Klasik, Daniel; Cohodes, Sarah

    2007-01-01

    This study focuses on flexibility provisions in the Rural Education Achievement Program (REAP) provision of NCLB. Specifically, it addresses REAP Flex, a program that allows rural districts additional control over how to spend portions of their federal funding. REAP Flex is part of a series of NCLB flexibility initiatives aimed at rural schools.…

  13. 40 CFR 147.2000 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... UIC program for all classes of wells in Rhode Island, except those on Indian lands, is the program... Procedures”; (5) Rhode Island General Laws, Section 46-12-1 et seq., entitled “Water Pollution”; (6... Regulations for Water Pollution Control, effective November 19, 1981; and (8) Administrative Rules...

  14. Superfund TIO videos. Set A. Regulatory overview - CERCLA's relationship to other programs: RCRA, Title III, UST, CWA, SDWA. Part 1. Audio-Visual

    SciTech Connect

    Not Available

    1990-01-01

    The videotape is divided into five sections. Section 1 provides definitions and historical information on both the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). The four types of RCRA regulatory programs - Subtitles C, D, I, and J - are described. Treatment, storage, and disposal (TSD) and recycling facilities are also discussed. Section 2 discusses the history behind the Emergency Planning and Community Right-to-Know Act (Title III). The four major provisions of Title III, which are emergency planning, emergency release notification, community right-to-know reporting, and the toxic chemical release inventory are covered. Section 3 outlines the UST program covering notification, record keeping, and the UST Trust Fund. Section 4 outlines the six major provisions of the Clean Water Act (CWA): water quality, pretreatment, prevention of oil and hazardous substance discharges, responses to oil and hazardous substance discharges, discharges of hazardous substances into the ocean, and dredge and fill. Section 5 explains the purpose, regulations, and standards of the Safe Drinking Water Act (SDWA). Specific issues such as underground injection, sole source aquifers, and lead contamination are discussed.

  15. Implementing a Resource-Based Relative Value Scale Fee Schedule for Physician Services: An Assessment of Policy Options for the California Workers' Compensation Program.

    PubMed

    Wynn, Barbara O; Liu, Hangsheng; Mulcahy, Andrew W; Okeke, Edward N; Iyer, Neema; Painter, Lawrence S

    2014-01-01

    A RAND study used 2011 medical data to examine the impact of implementing a resource-based relative value scale to pay for physician services under the California workers' compensation system. Current allowances under the Official Medical Fee Schedule are approximately 116 percent of Medicare-allowed amounts and, by law, will transition to 120 percent of Medicare over four years. Using Medicare policies to establish the fee-schedule amounts, aggregate allowances are estimated to decrease for four types of service by the end of the transition in 2017: anesthesia (-16.5 percent), surgery (-19.9 percent), radiology (-16.5 percent), and pathology (-29.0 percent). Aggregate allowances for evaluation and management visits are estimated to increase by 39.5 percent. Allowances for services classified as "medicine" in the Current Procedural Terminology codebook will increase by 17.3 percent. In the aggregate, across all services, allowances are projected to increase 11.9 percent. Because most specialties furnish different types of services, the impacts by specialty are generally less than the impacts by type of service.

  16. Evaluation of a 12-hour/day shift schedule

    SciTech Connect

    Lewis, P.M.; Swaim, D.J.

    1986-06-01

    In April 1985, the operating crews at the Fast Flux Test Facility near Richland, Washington, changed their rotating shift schedule from an 8- to a 12-hour/day work schedule. The primary purpose of the change was to reduce the attrition of operators by increasing their job satisfaction. Eighty-four percent of the operators favored the change. A program was established to evaluate the effects on plant performance, operator alertness, attrition, sleep, health, job satisfaction, and off-the-job satisfaction. Preliminary results from that evaluation program indicate that the 12-hour shift schedule is a reasonable alternative to an 8-hour schedule at this facility.

  17. Evaluation of a twelve-hour/day shift schedule

    SciTech Connect

    Lewis, P.M.; Swaim, D.J.

    1986-06-18

    In April 1985, the operating crews at the Fast Flux Test Facility near Richland, Washington, changed their rotating shift schedule from an 8-hour to a 12-hour a day work schedule. The primary purpose of the change was to reduce the attrition of operators by increasing their job satisfaction. Eighty-four percent of the operators favored the change. A program was established to evaluate the effects on plant performance, operator alertness, attrition, sleep, health, job satisfaction, and off-the-job satisfaction. Preliminary results from that evaluation program indicate that the 12-hour shift schedule is a reasonable alternative to an 8-hour schedule at this facility.

  18. SUPERSTARS III: 6-8.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Education, Raleigh.

    SUPERSTARS III is a K-8 program designed as an enrichment opportunity for self-directed learners in mathematics. The basic purpose of SUPERSTARS III is to provide the extra challenge that self-motivated students need in mathematics and to do so in a structured, long-term program that does not impinge on the normal classroom routine or the…

  19. SUPERSTARS III: 3-5.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Education, Raleigh.

    SUPERSTARS III is a K-8 program designed as an enrichment opportunity for self-directed learners in mathematics. The basic purpose of SUPERSTARS III is to provide the extra challenge that self-motivated students need in mathematics and to do so in a structured, long-term program that does not impinge on the normal classroom routine or the…

  20. Demonstration program for coal-oil mixture combustion in an electric utility boiler - Category III A. 1978 annual report

    SciTech Connect

    Not Available

    1980-04-01

    The 1978 annual report covers New England Power Service Company's participation in the Department of Energy coal-oil mixture (COM) program. Continued world-wide unrest resulting in an unstable fuel oil supply coupled with rapidly inflating costs have caused continued interest in a demonstrable viable solution. NEPSCO's program, while not attaining all the milestones forecast, has made considerable progress. As of January 31, 1979, ninety-five (95% percent of engineering and design has been completed. Construction of facilities and installation of required equipment was approximately 75% complete and the six-week Feasibility Testing program was expected to commence during April 1979.

  1. Intelligent perturbation algorithms for space scheduling optimization

    NASA Technical Reports Server (NTRS)

    Kurtzman, Clifford R.

    1990-01-01

    The optimization of space operations is examined in the light of optimization heuristics for computer algorithms and iterative search techniques. Specific attention is given to the search concepts known collectively as intelligent perturbation algorithms (IPAs) and their application to crew/resource allocation problems. IPAs iteratively examine successive schedules which become progressively more efficient, and the characteristics of good perturbation operators are listed. IPAs can be applied to aerospace systems to efficiently utilize crews, payloads, and resources in the context of systems such as Space-Station scheduling. A program is presented called the MFIVE Space Station Scheduling Worksheet which generates task assignments and resource usage structures. The IPAs can be used to develop flexible manifesting and scheduling for the Industrial Space Facility.

  2. Intelligent scheduling support for the US Coast Guard

    SciTech Connect

    Darby-Dowman, K.; Lucas, C.; Mitra, G. ); Fink, R. ); Kingsley, L.; Smith, J.W. )

    1992-01-01

    This paper will discuss a joint effort by the U.S. Coast Guard Research Development Center, Idaho National Engineering Laboratory and Brunel University to provide the necessary tools to increase the human scheduler's capability to handle the scheduling process more efficiently and effectively. Automating the scheduling process required a system that could think independently of the scheduler, that is, the systems needed its own control mechanism and knowledge base. Further, automated schedule generation became a design requirement and sophisticated algorithms were formulated to solve a complex combinatorial problem. In short, the resulting design can be viewed as a hybrid knowledge-based mathematical programming application system. This document contains an overview of the integrated system, a discrete optimization model for scheduling, and schedule diagnosis and analysis.

  3. Computerizing the Reference Desk Schedule.

    ERIC Educational Resources Information Center

    deHaas, Pat

    1983-01-01

    Discussion of the scheduling procedures of librarians' hours at the reference desk at the Rutherford Humanities and Social Sciences Library, University of Alberta, highlights services provided, the preference table system, and manual scheduling versus computer scheduling. (EJS)

  4. Schedulers with load-store queue awareness

    DOEpatents

    Chen, Tong; Eichenberger, Alexandre E.; Jacob, Arpith C.; Sura, Zehra N.

    2017-01-24

    In one embodiment, a computer-implemented method includes tracking a size of a load-store queue (LSQ) during compile time of a program. The size of the LSQ is time-varying and indicates how many memory access instructions of the program are on the LSQ. The method further includes scheduling, by a computer processor, a plurality of memory access instructions of the program based on the size of the LSQ.

  5. Schedulers with load-store queue awareness

    DOEpatents

    Chen, Tong; Eichenberger, Alexandre E.; Jacob, Arpith C.; Sura, Zehra N.

    2017-02-07

    In one embodiment, a computer-implemented method includes tracking a size of a load-store queue (LSQ) during compile time of a program. The size of the LSQ is time-varying and indicates how many memory access instructions of the program are on the LSQ. The method further includes scheduling, by a computer processor, a plurality of memory access instructions of the program based on the size of the LSQ.

  6. Family Support Centers: A Program Manager's Toolkit. Volume I: Program Planning and Evaluation [and] Volume II: Managing Ongoing Operations [and] Volume III: The Power of Partnership.

    ERIC Educational Resources Information Center

    Family Support America, Chicago, IL.

    Since their appearance in the early 1970s, family support programs have represented a new way of working with families, based on the partnership they establish with families, their acceptance in the community as an asset and resource for all families, and the trusting relationship they build with families who participate in these programs. This…

  7. Effective Schools Programs in High Schools: Implications for Policy, Practice and Research. Volume III. Review of Effective Schools Programs. Final Report.

    ERIC Educational Resources Information Center

    Farrar, Eleanor; And Others

    The effective schools movement, a program which involves school staff in diagnosis of problems, decisions on correcting them, research on the effectiveness of various alternatives, and training and assistance with improvement efforts, has focused, up until now, on elementary schools. The feasibility of transferring these programs to high schools…

  8. Prevention Plus III: Assessing Alcohol and Other Drug Prevention Programs at the School and Community Level. A Four-Step Guide to Useful Program Assessment.

    ERIC Educational Resources Information Center

    Linney, Jean Ann; Wandersman, Abraham

    This workbook, the third in a series of "Prevention Plus" publications, provides a step-by-step approach to assessing alcohol and other drug prevention programs at the school and community level. Program assessment is presented according to a four-step model: (1) goal and desired outcome identification; (2) process assessment; (3) outcome…

  9. Gemcitabine and cisplatin in a concomitant alternating chemoradiotherapy program for locally advanced head-and-neck cancer: A pharmacology-guided schedule

    SciTech Connect

    Numico, Gianmauro . E-mail: gianmauro.numico@fastwebnet.it; Russi, Elvio G.; Vitiello, Raffele; Sorrentino, Raffaele; Colantonio, Ida; Cipolat, Marco; Taglianti, Riccardo Vigna; Pelissero, Antonio; Fea, Elena; Granetto, Cristina; Di Costanzo, Gianna; Gasco, Milena; Garrone, Ornella; Occelli, Marcella; Merlano, Marco

    2006-11-01

    Purpose: Administration of gemcitabine together with cisplatin at cytotoxic doses in a chemoradiotherapy regimen is hampered by a high degree of local toxicity. Using the pharmacologic properties of the drug we designed a modified schedule aimed at reducing toxicity while preserving activity. Methods and Materials: Patients with squamous cell carcinomas of the oral cavity, pharynx and larynx, bulky T4, and/or N2 to N3 were eligible. Gemcitabine was administered at a dose of 800 mg/m{sup 2} on Days 1 and 12 and cisplatin at a dose of 20 mg/m{sup 2} on Days 2 to 5, every 21 days for 3 courses. Radiotherapy, delivered with standard fractionation, was given on Days 8 to 12 and 15 to 19 and was repeated 3 times up to a total dose of {>=}60 Gy. Results: A total of 28 patients were selected. Grade 3 to 4 stomatitis was recorded in 25 patients (89%). Thirteen patients (46%) experienced Grade 3 to 4 neutropenia. Febrile neutropenia occurred in 8 patients (29%) and in 2 was complicated by infection and death. The overall complete response rate was 79%. At a median follow up of 71 months, 11 patients had a locoregional relapse (3-year locoregional control, 64%); 6 patients had distant metastases, among whom only 2 were without locoregional recurrence. The 3-year progression-free survival is 39% and 3-year overall survival has been 43%. Conclusion: The schedule modification did not attenuate local toxicity. Moreover, infections and especially pneumonia, were a major problem. The high activity of gemcitabine when combined with radiotherapy would most likely be better exploited in the context of modified radiation schemes.

  10. Analysis of the integration of the physician rostering problem and the surgery scheduling problem.

    PubMed

    Van Huele, Christophe; Vanhoucke, Mario

    2014-06-01

    In this paper, we present the Integrated Physician and Surgery Scheduling Problem (IPSSP) as a new approach for solving operating room scheduling problems where staff rosters for the physicians are integrated in the optimization. A mixed integer linear programming formulation is created based on the most frequently observed objective and restrictions of the surgery scheduling and the physician rostering problem in the literature. We analyze schedules by relaxing both surgery and physician related constraints. We then measure the implications of setting these physician preferences on the surgery schedule. Our experiments show two main interesting insights for physician roster schedulers as well as operating theatre scheduling managers.

  11. Generically Used Expert Scheduling System (GUESS): User's Guide Version 1.0

    NASA Technical Reports Server (NTRS)

    Liebowitz, Jay; Krishnamurthy, Vijaya; Rodens, Ira

    1996-01-01

    This user's guide contains instructions explaining how to best operate the program GUESS, a generic expert scheduling system. GUESS incorporates several important features for a generic scheduler, including automatic scheduling routines to generate a 'first' schedule for the user, a user interface that includes Gantt charts and enables the human scheduler to manipulate schedules manually, diagnostic report generators, and a variety of scheduling techniques. The current version of GUESS runs on an IBM PC or compatible in the Windows 3.1 or Windows '95 environment.

  12. Effects of phase III cardiac rehabilitation programs on health-related quality of life in elderly patients with coronary artery disease: Juntendo Cardiac Rehabilitation Program (J-CARP).

    PubMed

    Seki, Eriko; Watanabe, Yoshiro; Sunayama, Satoshi; Iwama, Yoshitaka; Shimada, Kazunori; Kawakami, Kazunobu; Sato, Mizue; Sato, Hiroyuki; Mokuno, Hiroshi; Daida, Hiroyuki

    2003-01-01

    The purpose of this prospective randomized controlled trial was to assess the impact of phase III comprehensive cardiac rehabilitation (CR) on health-related quality of life (HRQOL) in elderly patients with coronary artery disease (CAD). Thirty-eight elderly males (mean age, 70 years) with CAD were stratified as the intervention group (n=20) and the control group (n=18). In the intervention group, patients participated in CR for 6 months, whereas in the control group, they received standard care. Validated questionnaires were obtained to evaluate HRQOL using the Medical Outcome Study Short-Form 36 Health Status Survey (SF-36), State-trait anxiety inventory questionnaire (STAI) and Self-rating Depression Scale (SDS) at baseline and after 6 months. At baseline, scores of SF-36 except for general health, STAI and SDS were not different in either group. After 6 months, in the intervention group, scores of bodily pain, general health, vitality and mental health of SF-36 improved significantly compared with baseline. State anxiety scores also improved significantly (p<0.01), but SDS depression scores were not improved. In the control group, none of the parameters significantly changed. These results indicate that elderly patients with CAD should be vigorously encouraged to pursue CR even in chronic phase III.

  13. Enhanced Software for Scheduling Space-Shuttle Processing

    NASA Technical Reports Server (NTRS)

    Barretta, Joseph A.; Johnson, Earl P.; Bierman, Rocky R.; Blanco, Juan; Boaz, Kathleen; Stotz, Lisa A.; Clark, Michael; Lebovitz, George; Lotti, Kenneth J.; Moody, James M.; Nguyen, Tony K.; Peterson, Kenneth A.; Sargent, Susan; Shaw, Karma; Stoner, Mack D.; Stowell, Deborah S.; Young, Daniel A.; Tulley, James H., Jr.

    2004-01-01

    The Ground Processing Scheduling System (GPSS) computer program is used to develop streamlined schedules for the inspection, repair, and refurbishment of space shuttles at Kennedy Space Center. A scheduling computer program is needed because space-shuttle processing is complex and it is frequently necessary to modify schedules to accommodate unanticipated events, unavailability of specialized personnel, unexpected delays, and the need to repair newly discovered defects. GPSS implements constraint-based scheduling algorithms and provides an interactive scheduling software environment. In response to inputs, GPSS can respond with schedules that are optimized in the sense that they contain minimal violations of constraints while supporting the most effective and efficient utilization of space-shuttle ground processing resources. The present version of GPSS is a product of re-engineering of a prototype version. While the prototype version proved to be valuable and versatile as a scheduling software tool during the first five years, it was characterized by design and algorithmic deficiencies that affected schedule revisions, query capability, task movement, report capability, and overall interface complexity. In addition, the lack of documentation gave rise to difficulties in maintenance and limited both enhanceability and portability. The goal of the GPSS re-engineering project was to upgrade the prototype into a flexible system that supports multiple- flow, multiple-site scheduling and that retains the strengths of the prototype while incorporating improvements in maintainability, enhanceability, and portability.

  14. Search Space Characterization for a Telescope Scheduling Application

    NASA Technical Reports Server (NTRS)

    Bresina, John; Drummond, Mark; Swanson, Keith; Friedland, Peter (Technical Monitor)

    1994-01-01

    This paper presents a technique for statistically characterizing a search space and demonstrates the use of this technique within a practical telescope scheduling application. The characterization provides the following: (i) an estimate of the search space size, (ii) a scaling technique for multi-attribute objective functions and search heuristics, (iii) a "quality density function" for schedules in a search space, (iv) a measure of a scheduler's performance, and (v) support for constructing and tuning search heuristics. This paper describes the random sampling algorithm used to construct this characterization and explains how it can be used to produce this information. As an example, we include a comparative analysis of an heuristic dispatch scheduler and a look-ahead scheduler that performs greedy search.

  15. Childhood Vaccine Schedule

    MedlinePlus

    ... Navigation Bar Home Current Issue Past Issues Childhood Vaccine Schedule Past Issues / Spring 2008 Table of Contents ... please turn Javascript on. When to Vaccinate What Vaccine Why Birth (or any age if not previously ...

  16. Distributed network scheduling

    NASA Technical Reports Server (NTRS)

    Clement, Bradley J.; Schaffer, Steven R.

    2004-01-01

    Distributed Network Scheduling is the scheduling of future communications of a network by nodes in the network. This report details software for doing this onboard spacecraft in a remote network. While prior work on distributed scheduling has been applied to remote spacecraft networks, the software reported here focuses on modeling communication activities in greater detail and including quality of service constraints. Our main results are based on a Mars network of spacecraft and include identifying a maximum opportunity of improving traverse exploration rate a factor of three; a simulation showing reduction in one-way delivery times from a rover to Earth from as much as 5 to 1.5 hours; simulated response to unexpected events averaging under an hour onboard; and ground schedule generation ranging from seconds to 50 minutes for 15 to 100 communication goals.

  17. Initial Hardware Development Schedule

    NASA Technical Reports Server (NTRS)

    Culpepper, William X.

    1991-01-01

    The hardware development schedule for the Common Lunar Lander's (CLLs) tracking system is presented. Among the topics covered are the following: historical perspective, solution options, industry contacts, and the rationale for selection.

  18. Junior-Senior High Tutor/Aide Program at Malcolm X Elementary School, ESEA Title III Evaluation. Final Report.

    ERIC Educational Resources Information Center

    Porter, Thomas J.; Hamilton, Edwin

    This project proposes to select, train, and utilize junior and senior high school students from neighboring schools as tutors for their young peers and as aides to the instructional team. Projected results of the program are that tutees will improve skills in reading, math, and special interests; that there will be an increase in individualized…

  19. 40 CFR 147.2200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., and 281. (ii) Vernon's Texas Codes Annotated, Water Code, Chapters 5, 7, 26, and 32, Health and Safety... the Texas Natural Resource Conservation Commission a predecessor to the Texas Commission on... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND...

  20. 40 CFR 147.2200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., and 281. (ii) Vernon's Texas Codes Annotated, Water Code, Chapters 5, 7, 26, and 32, Health and Safety... the Texas Natural Resource Conservation Commission a predecessor to the Texas Commission on... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND...

  1. 40 CFR 147.2200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., and 281. (ii) Vernon's Texas Codes Annotated, Water Code, Chapters 5, 7, 26, and 32, Health and Safety... the Texas Natural Resource Conservation Commission a predecessor to the Texas Commission on... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND...

  2. 40 CFR 147.2200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., and 281. (ii) Vernon's Texas Codes Annotated, Water Code, Chapters 5, 7, 26, and 32, Health and Safety... the Texas Natural Resource Conservation Commission a predecessor to the Texas Commission on... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND...

  3. 40 CFR 147.2200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., and 281. (ii) Vernon's Texas Codes Annotated, Water Code, Chapters 5, 7, 26, and 32, Health and Safety... the Texas Natural Resource Conservation Commission a predecessor to the Texas Commission on... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND...

  4. 40 CFR 147.51 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Safe Drinking Water Act—Opinion by Legal Counsel for the Water Improvement Commission,” June 25, 1982... Water Pollution Control Act, Code of Alabama 1975, sections 22-22-1 through 22-22-14 (1980 and Supp... (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION...

  5. 40 CFR 147.51 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Safe Drinking Water Act—Opinion by Legal Counsel for the Water Improvement Commission,” June 25, 1982... Water Pollution Control Act, Code of Alabama 1975, sections 22-22-1 through 22-22-14 (1980 and Supp... (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION...

  6. 40 CFR 147.51 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Safe Drinking Water Act—Opinion by Legal Counsel for the Water Improvement Commission,” June 25, 1982... Water Pollution Control Act, Code of Alabama 1975, sections 22-22-1 through 22-22-14 (1980 and Supp... (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION...

  7. 40 CFR 147.51 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Safe Drinking Water Act—Opinion by Legal Counsel for the Water Improvement Commission,” June 25, 1982... Water Pollution Control Act, Code of Alabama 1975, sections 22-22-1 through 22-22-14 (1980 and Supp... (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION...

  8. 40 CFR 147.51 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Safe Drinking Water Act—Opinion by Legal Counsel for the Water Improvement Commission,” June 25, 1982... Water Pollution Control Act, Code of Alabama 1975, sections 22-22-1 through 22-22-14 (1980 and Supp... (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION...

  9. 40 CFR 147.2550 - State-administered program-Class I, III, IV and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Department of Environmental Quality, to Acting Director, Water Management Division, EPA Region VIII, December... AGENCY (CONTINUED) WATER PROGRAMS (CONTINUED) STATE, TRIBAL, AND EPA-ADMINISTERED UNDERGROUND INJECTION...-11-301 through 35-11-305 (1977 Republished Edition and 1989 Cumm. Supp.); (2) Water Quality Rules...

  10. 40 CFR 147.2400 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Indian lands, is the program administered by the Washington Department of Ecology, approved by EPA..., chapter 43.21A (Bureau of National Affairs, 1980 Laws), entitled “Department of Ecology,” as amended by...) The Memorandum of Agreement between EPA Region X and the Washington Department of Ecology, signed...

  11. 40 CFR 147.2400 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Indian lands, is the program administered by the Washington Department of Ecology, approved by EPA..., chapter 43.21A (Bureau of National Affairs, 1980 Laws), entitled “Department of Ecology,” as amended by...) The Memorandum of Agreement between EPA Region X and the Washington Department of Ecology, signed...

  12. 40 CFR 147.200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the program administered by the Arkansas Department of Pollution Control and Ecology approved by EPA... Code, Department of Pollution Control and Ecology, promulgated January 22, 1982; (4) General Rule and... Management Code, Department of Pollution Control and Ecology, promulgated August 21, 1981. (b) The...

  13. 40 CFR 147.200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the program administered by the Arkansas Department of Pollution Control and Ecology approved by EPA... Code, Department of Pollution Control and Ecology, promulgated January 22, 1982; (4) General Rule and... Management Code, Department of Pollution Control and Ecology, promulgated August 21, 1981. (b) The...

  14. 40 CFR 147.2400 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Indian lands, is the program administered by the Washington Department of Ecology, approved by EPA..., chapter 43.21A (Bureau of National Affairs, 1980 Laws), entitled “Department of Ecology,” as amended by...) The Memorandum of Agreement between EPA Region X and the Washington Department of Ecology, signed...

  15. 40 CFR 147.200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the program administered by the Arkansas Department of Pollution Control and Ecology approved by EPA... Code, Department of Pollution Control and Ecology, promulgated January 22, 1982; (4) General Rule and... Management Code, Department of Pollution Control and Ecology, promulgated August 21, 1981. (b) The...

  16. 40 CFR 147.200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the program administered by the Arkansas Department of Pollution Control and Ecology approved by EPA... Code, Department of Pollution Control and Ecology, promulgated January 22, 1982; (4) General Rule and... Management Code, Department of Pollution Control and Ecology, promulgated August 21, 1981. (b) The...

  17. 40 CFR 147.2400 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Indian lands, is the program administered by the Washington Department of Ecology, approved by EPA..., chapter 43.21A (Bureau of National Affairs, 1980 Laws), entitled “Department of Ecology,” as amended by...) The Memorandum of Agreement between EPA Region X and the Washington Department of Ecology, signed...

  18. 40 CFR 147.200 - State-administered program-Class I, III, IV, and V wells.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the program administered by the Arkansas Department of Pollution Control and Ecology approved by EPA... Code, Department of Pollution Control and Ecology, promulgated January 22, 1982; (4) General Rule and... Management Code, Department of Pollution Control and Ecology, promulgated August 21, 1981. (b) The...

  19. 40 CFR 147.2400 - State-administered program-Class I, II, III, IV, and V wells.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Indian lands, is the program administered by the Washington Department of Ecology, approved by EPA..., chapter 43.21A (Bureau of National Affairs, 1980 Laws), entitled “Department of Ecology,” as amended by...) The Memorandum of Agreement between EPA Region X and the Washington Department of Ecology, signed...

  20. Development of a Residential Education Program for Emotionally Deprived Pseudo-Retarded Blind Children, Volumes II and III. Final Report.

    ERIC Educational Resources Information Center

    Rigby, Mary E.; Woodcock, Charles C.

    A continuation of a report (EC 004 818) presents appended case studies of 15 children involved in a residential school program for the multiply handicapped blind. Each study provides information and developmental history, medical data, personal hygiene, eating habits, physical development, psychological adjustment, object recognition, classroom…

  1. Evidence-Based Programming in the Context of Practice and Policy. Social Policy Report. Volume XXIII, Number III

    ERIC Educational Resources Information Center

    McCall, Robert B.

    2009-01-01

    Scholars, practice professionals, and policymakers should welcome the new era of evidence-based programming and policies, but these constituencies need to be realistic about the complexities, uncertainties, and limitations that lie beneath what could easily become a simplistic process. This paper discusses some of the requirements for the…

  2. Fundamentals of Shiftwork Scheduling

    DTIC Science & Technology

    2006-04-01

    works non-standard shifts that include evenings, nights and/or weekends. Sleep hygiene . Healthful time management with respect to sleep quality. Work...This report is designed for use by managers , supervisors, shiftwork schedulers and employees. It defines the principles and components of a method of...contributions are gratefully acknowledged vLi SUMMARY This report is designed for use by managers , supervisors, shifiwork schedulers and employees. It

  3. Expert system for scheduling simulation lab sessions

    NASA Technical Reports Server (NTRS)

    Lund, Chet

    1990-01-01

    Implementation and results of an expert system used for scheduling session requests for the Systems Engineering Simulator (SES) laboratory at the NASA Johnson Space Center (JSC) are discussed. Weekly session requests are received from astronaut crew trainers, procedures developers, engineering assessment personnel, software developers, and various others who wish to access the computers, scene generators, and other simulation equipment available to them in the SES lab. The expert system under discussion is comprised of a data acquisition portion - two Pascal programs run on a personal computer - and a CLIPS program installed on a minicomputer. A brief introduction to the SES lab and its scheduling background is given. A general overview of the system is provided, followed by a detailed description of the constraint-reduction process and of the scheduler itself. Results from a ten-week trial period using this approach are discussed. Finally, a summary of the expert system's strengths and shortcomings are provided.

  4. Affirmative Action: The Scheduled Castes and the Scheduled Tribes.

    ERIC Educational Resources Information Center

    Sivaramayya, B.

    This paper considers Indian affirmative action policies that provide reservations (quotas) in favor of two disadvantaged groups, the scheduled castes and the scheduled tribes. First, definitions and background are presented. The scheduled castes ("untouchables") are said to suffer from social segregation, and the scheduled tribes from…

  5. Scheduling periodic jobs using imprecise results

    NASA Technical Reports Server (NTRS)

    Chung, Jen-Yao; Liu, Jane W. S.; Lin, Kwei-Jay

    1987-01-01

    One approach to avoid timing faults in hard, real-time systems is to make available intermediate, imprecise results produced by real-time processes. When a result of the desired quality cannot be produced in time, an imprecise result of acceptable quality produced before the deadline can be used. The problem of scheduling periodic jobs to meet deadlines on a system that provides the necessary programming language primitives and run-time support for processes to return imprecise results is discussed. Since the scheduler may choose to terminate a task before it is completed, causing it to produce an acceptable but imprecise result, the amount of processor time assigned to any task in a valid schedule can be less than the amount of time required to complete the task. A meaningful formulation of the scheduling problem must take into account the overall quality of the results. Depending on the different types of undesirable effects caused by errors, jobs are classified as type N or type C. For type N jobs, the effects of errors in results produced in different periods are not cumulative. A reasonable performance measure is the average error over all jobs. Three heuristic algorithms that lead to feasible schedules with small average errors are described. For type C jobs, the undesirable effects of errors produced in different periods are cumulative. Schedulability criteria of type C jobs are discussed.

  6. Federal Facility Agreement plans and schedules for liquid low-level radioactive waste tank systems at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental Restoration Program

    SciTech Connect

    Not Available

    1992-03-01

    Although the Federal Facility Agreement (FFA) addresses the entire Oak Ridge Reservation, specific requirements are set forth for the liquid low-level radioactive waste (LLLW) storage tanks and their associated piping and equipment, tank systems, at ORNL. The stated objected of the FFA as it relates to these tank systems is to ensure that structural integrity, containment and detection of releases, and source control are maintained pending final remedial action at the site. The FFA requires that leaking LLLW tank systems be immediately removed from service. It also requires the LLLW tank systems that do not meet the design and performance requirements established for secondary containment and leak detection be either upgraded or replaced. The FFA establishes a procedural framework for implementing the environmental laws. For the LLLW tank systems, this framework requires the specified plans and schedules be submitted to EPA and TDEC for approval within 60 days, or in some cases, within 90 days, of the effective date of the agreement.

  7. Grant Administration Manual for Title III Coordinators.

    ERIC Educational Resources Information Center

    Mathis, Emily Duncan; Ashmore, Frances W.

    Guidelines for coordinators of programs under Title III of the Higher Education Act of 1965 are presented, based on a national survey of Title III program coordinators. The responsibilities of the coordinator and information on administering the Strengthening Developing Institutions Program (SDIP) grant are covered. The program can either be a…

  8. Some effects of reinforcement schedules in teaching picture names to retarded children.

    PubMed

    Stephens, C E; Pear, J J; Wray, L D; Jackson, G C

    1975-01-01

    The effects of several different schedules of primary reinforcement were compared in a picture-naming task with retarded children. In Experiment I, number of correct responses and learning rate were higher under fixed-ratio schedules than under continuous reinforcement. In Experiment II, number of correct responses and learning rate tended to be greater under in intermediate than under low or high fixed-ratio schedules. In Experiment III, number of correct responses was higher under interlocking schedules, in which the response requirement increased with time following the previous reinforcement, than under comparable fixed-ratio schedules. Learning rates were generally low and, perhaps because of this, not very different under the two types of schedules in this experiment. Accuracy (i.e., proportion of trials on which correct responses occurred) was typically high and insensitive to variations in schedule and schedule parameter throughout each experiment.

  9. 14 CFR 91.1029 - Flight scheduling and locating requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Flight scheduling and locating requirements... Ownership Operations Program Management § 91.1029 Flight scheduling and locating requirements. (a) Each... established for locating each flight, for which a flight plan is not filed, that— (1) Provide the...

  10. 14 CFR 91.1029 - Flight scheduling and locating requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Flight scheduling and locating requirements... Ownership Operations Program Management § 91.1029 Flight scheduling and locating requirements. (a) Each... established for locating each flight, for which a flight plan is not filed, that— (1) Provide the...

  11. 40 CFR 281.23 - Schedule for interim approval.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Schedule for interim approval. 281.23 Section 281.23 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... Schedule for interim approval. For a state program that must modify its statutory or...

  12. 10 CFR 490.302 - Vehicle acquisition mandate schedule.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Vehicle acquisition mandate schedule. 490.302 Section 490.302 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fuel Provider Vehicle Acquisition Mandate § 490.302 Vehicle acquisition mandate schedule....

  13. 10 CFR 490.302 - Vehicle acquisition mandate schedule.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 3 2011-01-01 2011-01-01 false Vehicle acquisition mandate schedule. 490.302 Section 490.302 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fuel Provider Vehicle Acquisition Mandate § 490.302 Vehicle acquisition mandate schedule....

  14. 10 CFR 490.302 - Vehicle acquisition mandate schedule.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 3 2014-01-01 2014-01-01 false Vehicle acquisition mandate schedule. 490.302 Section 490.302 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fuel Provider Vehicle Acquisition Mandate § 490.302 Vehicle acquisition mandate schedule....

  15. 10 CFR 490.302 - Vehicle acquisition mandate schedule.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 3 2012-01-01 2012-01-01 false Vehicle acquisition mandate schedule. 490.302 Section 490.302 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fuel Provider Vehicle Acquisition Mandate § 490.302 Vehicle acquisition mandate schedule....

  16. 10 CFR 490.302 - Vehicle acquisition mandate schedule.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 3 2013-01-01 2013-01-01 false Vehicle acquisition mandate schedule. 490.302 Section 490.302 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION ALTERNATIVE FUEL TRANSPORTATION PROGRAM Alternative Fuel Provider Vehicle Acquisition Mandate § 490.302 Vehicle acquisition mandate schedule....

  17. 20 CFR 638.505 - Scheduling of training.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 3 2012-04-01 2012-04-01 false Scheduling of training. 638.505 Section 638.505 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR JOB CORPS PROGRAM UNDER TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Center Operations § 638.505 Scheduling of...

  18. 20 CFR 638.505 - Scheduling of training.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Scheduling of training. 638.505 Section 638.505 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR JOB CORPS PROGRAM UNDER TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Center Operations § 638.505 Scheduling of...

  19. 20 CFR 638.505 - Scheduling of training.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Scheduling of training. 638.505 Section 638.505 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR JOB CORPS PROGRAM UNDER TITLE IV-B OF THE JOB TRAINING PARTNERSHIP ACT Center Operations § 638.505 Scheduling of...

  20. Purdue Academic Student Scheduling. PASS. Goals, Guidelines, and Operations.

    ERIC Educational Resources Information Center

    Abell, Victor A.

    PASS produces student schedules. This manual offers an operational record of the PASS system, and describes its structure within the total registration process. The primary goals of PASS, a "choice-course" system, are to satisfy student program requirements and equally distribute class load through the master schedule from a total…

  1. 42 CFR 412.610 - Assessment schedule.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 2 2010-10-01 2010-10-01 false Assessment schedule. 412.610 Section 412.610 Public Health CENTERS FOR MEDICARE & MEDICAID SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES MEDICARE PROGRAM... patient's clinical record or in an electronic computer file format that the inpatient...

  2. Schedule and status of irradiation experiments

    SciTech Connect

    Rowcliffe, A.F.; Grossbeck, M.L.; Robertson, J.P.

    1998-09-01

    The current status of reactor irradiation experiments is presented in tables summarizing the experimental objectives, conditions, and schedule. Currently, the program has one irradiation experiment in reactor and five experiments in the design or construction stages. Postirradiation examination and testing is in progress on ten experiments.

  3. 45 CFR 1801.52 - Payment schedule.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Welfare Regulations Relating to Public Welfare (Continued) HARRY S. TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Payment Conditions and Procedures § 1801.52 Payment schedule. The Foundation will pay the Scholar a portion of the award of the Scholarship stipend (as described in the...

  4. 45 CFR 1801.52 - Payment schedule.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Welfare Regulations Relating to Public Welfare (Continued) HARRY S. TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Payment Conditions and Procedures § 1801.52 Payment schedule. The Foundation will pay the Scholar a portion of the award of the Scholarship stipend (as described in the...

  5. 45 CFR 1801.52 - Payment schedule.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Welfare Regulations Relating to Public Welfare (Continued) HARRY S. TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Payment Conditions and Procedures § 1801.52 Payment schedule. The Foundation will pay the Scholar a portion of the award of the Scholarship stipend (as described in the...

  6. 45 CFR 1801.52 - Payment schedule.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Welfare Regulations Relating to Public Welfare (Continued) HARRY S. TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Payment Conditions and Procedures § 1801.52 Payment schedule. The Foundation will pay the Scholar a portion of the award of the Scholarship stipend (as described in the...

  7. 45 CFR 1801.52 - Payment schedule.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Welfare Regulations Relating to Public Welfare (Continued) HARRY S. TRUMAN SCHOLARSHIP FOUNDATION HARRY S. TRUMAN SCHOLARSHIP PROGRAM Payment Conditions and Procedures § 1801.52 Payment schedule. The Foundation will pay the Scholar a portion of the award of the Scholarship stipend (as described in the...

  8. Schedule and status of irradiation experiments

    SciTech Connect

    Rowcliffe, A.F.; Grossbeck, M.L.; Robertson, J.P.

    1998-03-01

    The current status of reactor irradiation experiments is presented in tables summarizing the experimental objectives, conditions, and schedule. Currently, the program has four irradiation experiments in reactor, and five experiments in the design or construction stages. Postirradiation examination and testing is in progress on ten experiments.

  9. Scheduling with Automatic Resolution of Conflicts

    NASA Technical Reports Server (NTRS)

    Clement, Bradley; Schaffer, Steve

    2006-01-01

    DSN Requirement Scheduler is a computer program that automatically schedules, reschedules, and resolves conflicts for allocations of resources of NASA s Deep Space Network (DSN) on the basis of ever-changing project requirements for DSN services. As used here, resources signifies, primarily, DSN antennas, ancillary equipment, and times during which they are available. Examples of project-required DSN services include arraying, segmentation, very-long-baseline interferometry, and multiple spacecraft per aperture. Requirements can include periodic reservations of specific or optional resources during specific time intervals or within ranges specified in terms of starting times and durations. This program is built on the Automated Scheduling and Planning Environment (ASPEN) software system (aspects of which have been described in previous NASA Tech Briefs articles), with customization to reflect requirements and constraints involved in allocation of DSN resources. Unlike prior DSN-resource- scheduling programs that make single passes through the requirements and require human intervention to resolve conflicts, this program makes repeated passes in a continuing search for all possible allocations, provides a best-effort solution at any time, and presents alternative solutions among which users can choose.

  10. 76 FR 10233 - Schedule of Water Charges

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-24

    ... COMMISSION 18 CFR Part 420 Schedule of Water Charges AGENCY: Delaware River Basin Commission. ACTION: Final...--Water Supply Charges. Accordingly, the Commission's water charging rates for consumptive use and non.... FOR FURTHER INFORMATION CONTACT: For questions about the water charging program, please contact...

  11. Medication and symptom management education program for the rehabilitation of psychiatric patients in Korea: the effects of promoting schedule on self-efficacy theory.

    PubMed

    Shon, Kyung Hee; Park, Si Sung

    2002-10-01

    An effective rehabilitation program was developed for psychiatric patients' self-management of medication and symptoms. The rehabilitation program was designed to allow the patients to understand their illness, cope with their medical regimen, and prevent a relapse by recognizing any of the symptoms when they recur. This study consisted of three phases. The first phase was to explore the extent and the specific mental health needs of psychiatric patients. Data was obtained from 82 subjects who had symptoms of a mental illness including schizophrenia, bipolar disorders, and delusional disorder. They had received medication instruction during their hospitalization. The subjects were at the time outpatients in a psychiatric hospital. In the second phase, the researchers developed an educational program focused on coping with the residual and relapse warning signs, managing the drug side effects, medication compliance, and daily routines, according to the information acquired in the first step. The developed program includes the self-efficacy method reported by Bandura, including manuals and videotapes focusing on real life situations, small group discussions, and telephone coaching. Finally, the researchers investigated the effects of this program. Thirty-eight patients were selected for this study, 18 in the experimental program and 20 as controls. The diagnoses were same as those with the first step. The results showed that the subjects who attended this educational program reported significantly more improvement in self-efficacy (p=0.014) and medication compliance (p= 0.005), and significantly less relapse warning symptom scores (p=0.000) than the controls. In conclusion, these instructional materials will be beneficial for medication and symptom management in rehabilitating psychiatric patients in Korea. In addition, the materials may be a useful psychoeducational resource for professionals in the field of clinical psychiatry.

  12. Evaluation of Arkansas Vocational Training Programs in Relation to Economic Development, Part III-Evaluation of Programs and Recommendations. Industrial Research and Extension Center Publication No. L-6.

    ERIC Educational Resources Information Center

    Burt, Samuel M.

    The manpower requirements of industry in Arkansas are being poorly met by the present vocational and technical education system. They have inadequate facilities, and there are not enough students enrolled in trades and industry occupational fields or a broad enough range of programs to meet the variety of requirements from industry, business, and…

  13. Medicare Program; Merit-Based Incentive Payment System (MIPS) and Alternative Payment Model (APM) Incentive Under the Physician Fee Schedule, and Criteria for Physician-Focused Payment Models. Final rule with comment period.

    PubMed

    2016-11-04

    The Medicare Access and CHIP Reauthorization Act of 2015 (MACRA) repeals the Medicare sustainable growth rate (SGR) methodology for updates to the physician fee schedule (PFS) and replaces it with a new approach to payment called the Quality Payment Program that rewards the delivery of high-quality patient care through two avenues: Advanced Alternative Payment Models (Advanced APMs) and the Merit-based Incentive Payment System (MIPS) for eligible clinicians or groups under the PFS. This final rule with comment period establishes incentives for participation in certain alternative payment models (APMs) and includes the criteria for use by the Physician-Focused Payment Model Technical Advisory Committee (PTAC) in making comments and recommendations on physician-focused payment models (PFPMs). Alternative Payment Models are payment approaches, developed in partnership with the clinician community, that provide added incentives to deliver high-quality and cost-efficient care. APMs can apply to a specific clinical condition, a care episode, or a population. This final rule with comment period also establishes the MIPS, a new program for certain Medicare-enrolled practitioners. MIPS will consolidate components of three existing programs, the Physician Quality Reporting System (PQRS), the Physician Value-based Payment Modifier (VM), and the Medicare Electronic Health Record (EHR) Incentive Program for Eligible Professionals (EPs), and will continue the focus on quality, cost, and use of certified EHR technology (CEHRT) in a cohesive program that avoids redundancies. In this final rule with comment period we have rebranded key terminology based on feedback from stakeholders, with the goal of selecting terms that will be more easily identified and understood by our stakeholders.

  14. Automated Scheduling Via Artificial Intelligence

    NASA Technical Reports Server (NTRS)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  15. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1991-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocations for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its applications to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  16. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1991-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  17. Constraint-based scheduling

    NASA Technical Reports Server (NTRS)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  18. Scheduling Operations for Massive Heterogeneous Clusters

    NASA Technical Reports Server (NTRS)

    Humphrey, John; Spagnoli, Kyle

    2013-01-01

    High-performance computing (HPC) programming has become increasingly difficult with the advent of hybrid supercomputers consisting of multicore CPUs and accelerator boards such as the GPU. Manual tuning of software to achieve high performance on this type of machine has been performed by programmers. This is needlessly difficult and prone to being invalidated by new hardware, new software, or changes in the underlying code. A system was developed for task-based representation of programs, which when coupled with a scheduler and runtime system, allows for many benefits, including higher performance and utilization of computational resources, easier programming and porting, and adaptations of code during runtime. The system consists of a method of representing computer algorithms as a series of data-dependent tasks. The series forms a graph, which can be scheduled for execution on many nodes of a supercomputer efficiently by a computer algorithm. The schedule is executed by a dispatch component, which is tailored to understand all of the hardware types that may be available within the system. The scheduler is informed by a cluster mapping tool, which generates a topology of available resources and their strengths and communication costs. Software is decoupled from its hardware, which aids in porting to future architectures. A computer algorithm schedules all operations, which for systems of high complexity (i.e., most NASA codes), cannot be performed optimally by a human. The system aids in reducing repetitive code, such as communication code, and aids in the reduction of redundant code across projects. It adds new features to code automatically, such as recovering from a lost node or the ability to modify the code while running. In this project, the innovators at the time of this reporting intend to develop two distinct technologies that build upon each other and both of which serve as building blocks for more efficient HPC usage. First is the scheduling and dynamic

  19. Cost and schedule analytical techniques development

    NASA Technical Reports Server (NTRS)

    1994-01-01

    This contract provided technical services and products to the Marshall Space Flight Center's Engineering Cost Office (PP03) and the Program Plans and Requirements Office (PP02) for the period of 3 Aug. 1991 - 30 Nov. 1994. Accomplishments summarized cover the REDSTAR data base, NASCOM hard copy data base, NASCOM automated data base, NASCOM cost model, complexity generators, program planning, schedules, NASA computer connectivity, other analytical techniques, and special project support.

  20. Integrated planning and scheduling for Earth science data processing

    NASA Technical Reports Server (NTRS)

    Boddy, Mark; White, Jim; Goldman, Robert; Short, Nick, Jr.

    1995-01-01

    Several current NASA programs such as the EOSDIS Core System (ECS) have data processing and data management requirements that call for an integrated planning and scheduling capability. In this paper, we describe the experience of applying advanced scheduling technology operationally, in terms of what was accomplished, lessons learned, and what remains to be done in order to achieve similar successes in ECS and other programs. We discuss the importance and benefits of advanced scheduling tools, and our progress toward realizing them, through examples and illustrations based on ECS requirements. The first part of the paper focuses on the Data Archive and Distribution (DADS) V0 Scheduler. We then discuss system integration issues ranging from communication with the scheduler to the monitoring of system events and re-scheduling in response to them. The challenge of adapting the scheduler to domain-specific features and scheduling policies is also considered. Extrapolation to the ECS domain raises issues of integrating scheduling with a product-generation planner (such as PlaSTiC), and implementing conditional planning in an operational system. We conclude by briefly noting ongoing technology development and deployment projects being undertaken by HTC and the ISTB.

  1. The Apple III.

    ERIC Educational Resources Information Center

    Ditlea, Steve

    1982-01-01

    Describes and evaluates the features, performance, peripheral devices, available software, and capabilities of the Apple III microcomputer. The computer's operating system, its hardware, and the commercially produced software it accepts are discussed. Specific applications programs for financial planning, accounting, and word processing are…

  2. Scheduling with genetic algorithms

    NASA Technical Reports Server (NTRS)

    Fennel, Theron R.; Underbrink, A. J., Jr.; Williams, George P. W., Jr.

    1994-01-01

    In many domains, scheduling a sequence of jobs is an important function contributing to the overall efficiency of the operation. At Boeing, we develop schedules for many different domains, including assembly of military and commercial aircraft, weapons systems, and space vehicles. Boeing is under contract to develop scheduling systems for the Space Station Payload Planning System (PPS) and Payload Operations and Integration Center (POIC). These applications require that we respect certain sequencing restrictions among the jobs to be scheduled while at the same time assigning resources to the jobs. We call this general problem scheduling and resource allocation. Genetic algorithms (GA's) offer a search method that uses a population of solutions and benefits from intrinsic parallelism to search the problem space rapidly, producing near-optimal solutions. Good intermediate solutions are probabalistically recombined to produce better offspring (based upon some application specific measure of solution fitness, e.g., minimum flowtime, or schedule completeness). Also, at any point in the search, any intermediate solution can be accepted as a final solution; allowing the search to proceed longer usually produces a better solution while terminating the search at virtually any time may yield an acceptable solution. Many processes are constrained by restrictions of sequence among the individual jobs. For a specific job, other jobs must be completed beforehand. While there are obviously many other constraints on processes, it is these on which we focussed for this research: how to allocate crews to jobs while satisfying job precedence requirements and personnel, and tooling and fixture (or, more generally, resource) requirements.

  3. Collegiate Athletics: An Investigation into Athletic Persistence of Freshman Student-Athletes Participating in NCAA Division-III Varsity Athletic Programs

    ERIC Educational Resources Information Center

    Sombito, Lester Jamili

    2015-01-01

    Understanding of the persistence of student-athletes in athletics at the D-III level is complex. This research study investigated the issue of student-athlete retention by focusing on Division III (D-III) student-athlete persistence in athletics by asking the following research question, "To what extent do freshman student-athletes persist in…

  4. BIOPLUME III

    EPA Pesticide Factsheets

    BIOPLUME III is a two-dimensional finite difference model for simulating the natural attenuation of organic contaminants in groundwater due to the processes of advection, dispersion, sorption, and biodegradation.

  5. 2007 Wholesale Power Rate Case Initial Proposal : 2007 Wholesale Power Rate Schedule and General Rate Schedule Provisions.

    SciTech Connect

    United States. Bonneville Power Administration.

    2005-11-01

    This schedule is available for the contract purchase of Firm Power to be used within the Pacific Northwest (PNW). Priority Firm (PF) Power may be purchased by public bodies, cooperatives, and Federal agencies for resale to ultimate consumers, for direct consumption, and for Construction, Test and Start-Up, and Station Service. Rates in this schedule are in effect beginning October 1, 2006, and apply to purchases under requirements Firm Power sales contracts for a three-year period. The Slice Product is only available for public bodies and cooperatives who have signed Slice contracts for the FY 2002-2011 period. Utilities participating in the Residential Exchange Program (REP) under Section 5(c) of the Northwest Power Act may purchase Priority Firm Power pursuant to the Residential Exchange Program. Rates under contracts that contain charges that escalate based on BPA's Priority Firm Power rates shall be based on the three-year rates listed in this rate schedule in addition to applicable transmission charges. This rate schedule supersedes the PF-02 rate schedule, which went into effect October 1, 2001. Sales under the PF-07 rate schedule are subject to BPA's 2007 General Rate Schedule Provisions (2007 GRSPs). Products available under this rate schedule are defined in the 2007 GRSPs. For sales under this rate schedule, bills shall be rendered and payments due pursuant to BPA's 2007 GRSPs and billing process.

  6. Intelligent retail logistics scheduling

    SciTech Connect

    Rowe, J.; Jewers, K.; Codd, A.; Alcock, A.

    1996-12-31

    The Supply Chain Integrated Ordering Network (SCION) Depot Bookings system automates the planning and scheduling of perishable and non-perishable commodities and the vehicles that carry them into J. Sainsbury depots. This is a strategic initiative, enabling the business to make the key move from weekly to daily ordering. The system is mission critical, managing the inwards flow of commodities from suppliers into J. Sainsbury`s depots. The system leverages Al techniques to provide a business solution that meets challenging functional and performance needs. The SCION Depot Bookings system is operational providing schedules for 22 depots across the UK.

  7. 40 CFR 300.905 - NCP Product Schedule.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PLANNING, AND COMMUNITY RIGHT-TO-KNOW PROGRAMS NATIONAL OIL AND HAZARDOUS SUBSTANCES POLLUTION CONTINGENCY...-603-8760. (2) Products may be added to the NCP Product Schedule by the process specified in §...

  8. Using dBase III.

    ERIC Educational Resources Information Center

    Evans, Janet; And Others

    1986-01-01

    Four articles on dBASE III include three on library applications: a photocopy invoicing system for interlibrary loan, a vertical file subject headings list program, and a subject index to statistical resources. Another article explains the differences between interpreters and compilers and the advantages of the Clipper compiler for dBASE III. (EM)

  9. Different elution modes and field programming in gravitational field-flow fractionation. III. Field programming by flow-rate gradient generated by a programmable pump.

    PubMed

    Plocková, J; Chmelík, J

    2001-05-25

    Gravitational field-flow fractionation (GFFF) utilizes the Earth's gravitational field as an external force that causes the settlement of particles towards the channel accumulation wall. Hydrodynamic lift forces oppose this action by elevating particles away from the channel accumulation wall. These two counteracting forces enable modulation of the resulting force field acting on particles in GFFF. In this work, force-field programming based on modulating the magnitude of hydrodynamic lift forces was implemented via changes of flow-rate, which was accomplished by a programmable pump. Several flow-rate gradients (step gradients, linear gradients, parabolic, and combined gradients) were tested and evaluated as tools for optimization of the separation of a silica gel particle mixture. The influence of increasing amount of sample injected on the peak resolution under flow-rate gradient conditions was also investigated. This is the first time that flow-rate gradients have been implemented for programming of the resulting force field acting on particles in GFFF.

  10. Routine environmental monitoring schedule, calendar year 1998

    SciTech Connect

    McKinney, S.M.

    1997-11-24

    This document provides the Environmental Restorations Contractor (ERC) and the Project Hanford Management Contractor (PHMC) a schedule in accordance with the HNF-PRO-454, Inactive Waste Sites` HNF-PRO-455, Solid Waste 3 Management4 and BHI-EE-02, Environmental Requirements, of monitoring and sampling, routines for the near-facility environmental monitoring program during calendar year (CY) 1998. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Environmental Monitoring and Investigations. The survey frequencies for particular sites are determined by the technical judgment of Environmental Monitoring and investigations and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1999. The outside perimeter road surveys of 200 East and West Area and the rail survey from the 300 Area to Columbia Center will be performed in the year 2000 per agreement with Department of Energy, Richland Field Office. This schedule does not discuss staffing needs, nor does it list the monitoring equipment to be used in completing specific routines. Personnel performing routines to meet this schedule shall communicate any need for 1332 assistance in completing these routines to Radiological Control management and Environmental Monitoring and Investigations. After each routine survey is completed, a copy of the survey record, maps, and data sheets will be forwarded to Environmental Monitoring and Investigations. These routine surveys will not be considered complete until this

  11. Optimization Models for Scheduling of Jobs.

    PubMed

    Indika, S H Sathish; Shier, Douglas R

    2006-01-01

    This work is motivated by a particular scheduling problem that is faced by logistics centers that perform aircraft maintenance and modification. Here we concentrate on a single facility (hangar) which is equipped with several work stations (bays). Specifically, a number of jobs have already been scheduled for processing at the facility; the starting times, durations, and work station assignments for these jobs are assumed to be known. We are interested in how best to schedule a number of new jobs that the facility will be processing in the near future. We first develop a mixed integer quadratic programming model (MIQP) for this problem. Since the exact solution of this MIQP formulation is time consuming, we develop a heuristic procedure, based on existing bin packing techniques. This heuristic is further enhanced by application of certain local optimality conditions.

  12. Optimization Models for Scheduling of Jobs

    PubMed Central

    Indika, S. H. Sathish; Shier, Douglas R.

    2006-01-01

    This work is motivated by a particular scheduling problem that is faced by logistics centers that perform aircraft maintenance and modification. Here we concentrate on a single facility (hangar) which is equipped with several work stations (bays). Specifically, a number of jobs have already been scheduled for processing at the facility; the starting times, durations, and work station assignments for these jobs are assumed to be known. We are interested in how best to schedule a number of new jobs that the facility will be processing in the near future. We first develop a mixed integer quadratic programming model (MIQP) for this problem. Since the exact solution of this MIQP formulation is time consuming, we develop a heuristic procedure, based on existing bin packing techniques. This heuristic is further enhanced by application of certain local optimality conditions. PMID:27274921

  13. Information Consumption by Low Income Families to Reduce the Impact of Rural Poverty in Florida. Volume III, Knowledge Level, Need, and Use of Selective Anti-Poverty Programs by the Rural Poor.

    ERIC Educational Resources Information Center

    Dhillon, Jogindar S.

    Presented as part of a 4-volume comprehensive report of a Florida project designed to understand rural poor and their information-seeking and information-utilization behavior patterns, Volume III reported data collected in a pre-test, used to determine the awareness and utilization of seven anti-poverty programs. Low income rural residents (N=840)…

  14. 76 FR 47089 - Regulatory Review Schedule; Cancellation of Consultation Meetings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-04

    ... National Indian Gaming Commission 25 CFR Chapter III Regulatory Review Schedule; Cancellation of Consultation Meetings AGENCY: National Indian Gaming Commission. ACTION: Notice. SUMMARY: On November 18, 2010, the National Indian Gaming Commission (NIGC) issued a Notice of Inquiry and Notice of...

  15. Development of Demographic Norms for Four New WAIS-III/WMS-III Indexes

    ERIC Educational Resources Information Center

    Lange, Rael T.; Chelune, Gordon J.; Taylor, Michael J.; Woodward, Todd S.; Heaton, Robert K.

    2006-01-01

    Following the publication of the third edition Wechsler scales (i.e., WAIS-III and WMS-III), demographically corrected norms were made available in the form of a computerized scoring program (i.e., WAIS-III/WMS-III/WIAT-II Scoring Assistant). These norms correct for age, gender, ethnicity, and education. Since then, four new indexes have been…

  16. Advanced Technology System Scheduling Governance Model

    SciTech Connect

    Ang, Jim; Carnes, Brian; Hoang, Thuc; Vigil, Manuel

    2015-06-11

    In the fall of 2005, the Advanced Simulation and Computing (ASC) Program appointed a team to formulate a governance model for allocating resources and scheduling the stockpile stewardship workload on ASC capability systems. This update to the original document takes into account the new technical challenges and roles for advanced technology (AT) systems and the new ASC Program workload categories that must be supported. The goal of this updated model is to effectively allocate and schedule AT computing resources among all three National Nuclear Security Administration (NNSA) laboratories for weapons deliverables that merit priority on this class of resource. The process outlined below describes how proposed work can be evaluated and approved for resource allocations while preserving high effective utilization of the systems. This approach will provide the broadest possible benefit to the Stockpile Stewardship Program (SSP).

  17. Optimizing Observation Scheduling Objectives

    NASA Technical Reports Server (NTRS)

    Bresina, John L.; Morris, Robert A.; Edgington, William R.

    1997-01-01

    In this paper, we present an approach that enables the automatic generation of high quality schedules, with respect to a given objective function. The approach involves the combination of two techniques: GenH, which automatically generates a search heuristic specialized to the given problem instance, and HBSS, which employs the generated heuristic as a bias within a stochastic sampling method.

  18. "Creative" Work Schedules.

    ERIC Educational Resources Information Center

    Blai, Boris

    Many creative or flexible work scheduling options are becoming available to the many working parents, students, handicapped persons, elderly individuals, and others who are either unable or unwilling to work a customary 40-hour work week. These options may be broadly categorized as either restructured or reduced work time options. The three main…

  19. CMS multicore scheduling strategy

    SciTech Connect

    Perez-Calero Yzquierdo, Antonio; Hernandez, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  20. Schedule-Induced Stereotypy.

    ERIC Educational Resources Information Center

    Emerson, Eric; Howard, Denise

    1992-01-01

    The phenomena of the induction and entrainment of adjunctive behaviors was investigated in 8 people (ages 5-51) with severe or profound mental retardation who exhibited stereotypic behaviors. Seven of the eight demonstrated evidence of schedule-induced stereotypic behavior, whereas five also showed evidence of the entrainment of these behaviors by…