Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Scoping-environmental impact statement and supplement to environmental impact statement. 51.29 Section 51.29 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED... Environmental Policy Act-Regulations Implementing Section 102(2) Scoping § 51.29 Scoping-environmental impact...
10 CFR 51.71 - Draft environmental impact statement-contents.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-contents. 51.71... Implementing Section 102(2) Environmental Impact Statements § 51.71 Draft environmental impact statement—contents. (a) Scope. The draft environmental impact statement will be prepared in accordance with the scope...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-24
... Actions and To Conduct Public Scoping Meetings AGENCY: National Marine Fisheries Service (NMFS), National... environmental impact statement and conduct public scoping meetings. SUMMARY: NMFS intends to prepare an environmental impact statement (EIS) and to conduct public scoping meetings to comply with the National...
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Scoping-environmental impact statement and supplement to environmental impact statement. 51.29 Section 51.29 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND RELATED REGULATORY FUNCTIONS National...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-18
.... Requests to speak at any one or more public scoping meeting(s) should be received by Dr. Jerry Pell at the... Statement and To Conduct Public Scoping Meetings, and Notice of Floodplains and Wetlands Involvement... an Environmental Impact Statement (EIS) and to conduct Public Scoping Meetings; Notice of Floodplains...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-01-01
In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statementmore » to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
...The Department of the Navy published a document in the Federal Register (76 FR 174) on September 8, 2011, concerning public scoping meetings to support the development of an Environmental Impact Statement/Overseas Environmental Impact Statement for the Mariana Islands Training and Testing Study Area. The document contained an incorrect scoping date.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-12
... and Extend the Scoping Comment Period for the Environmental Impact Statement for the Four Corners... should consider in the planning and preparation of an environmental impact statement (EIS) for the Four... subject line of your email message, please indicate that the comments are ``Four Corners-Navajo Mine EIS...
44 CFR 10.10 - Preparation of environmental impact statements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Procedures § 10.10 Preparation of environmental impact statements. (a) Scoping. After determination that an environmental impact statement will be prepared and publication of the notice of intent, the Regional... environmental impact statement. Detailed procedures for preparation of the environmental impact statement are...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-08
... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Extending Scoping Period To Prepare a Programmatic Environmental Impact Statement (EIS) for the Navajo Nation Integrated Weed Management Plan Within... Integrated Weed Management Plan on the Navajo Indian Reservation. DATES: Scoping comments are due on March 20...
These reports provide summaries of the scoping meetings as part of the Supplemental Environmental Impact Statement (SEIS) process for the designation of dredged material disposal sites in Eastern Long Island Sound.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-11
... INFORMATION section of this NOI. Requests to speak at one or more public scoping meeting(s) should be received.... ADDRESSES: Requests to speak at a public scoping meeting, comments on the scope of the EIS, and requests to... Statement and Conduct Public Scoping Meetings, and Notice of Floodplains and Wetlands Involvement; Northern...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-08
... Draft Environmental Impact Statement (EIS), Initiate the Public Scoping Period and Host Public Scoping Meetings for the Great Lakes and Mississippi River Interbasin Study (``GLMRIS''); Correction, Clarification... international commerce, travel and local practices, ANS have been introduced throughout the Mississippi River...
78 FR 4586 - Environmental Impact Statement: Kake Access, AK
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-22
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement: Kake... Environmental Impact Statement (EIS) for a proposed transportation project to improve access to and from the... written comments on environmental concerns that should be addressed in the EIS. The public scoping...
78 FR 63959 - Environmental Impact Statement; Animal Carcass Management
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-25
...] Environmental Impact Statement; Animal Carcass Management AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Notice of intent to prepare an environmental impact statement and proposed scope of study... carcass management options used throughout the United States. This notice identifies potential...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-16
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13239-002] Parker Knoll Hydro, LLC; Notice of Intent To Prepare An Environmental Impact Statement and Notice of Scoping Meetings and Soliciting Scoping Comments Take notice that the following hydroelectric applications have been filed with Commission and are available for...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-18
... p.m. Requests to speak at one or more public scoping meeting(s) should be received at the address... ADDRESSES section. ADDRESSES: Requests to speak at a public scoping meeting(s), and requests for individuals... Impact Statement: Announcement of Change in Public Meeting Location AGENCY: Department of Energy. ACTION...
78 FR 79658 - Environmental Impact Statement; Animal Carcass Management
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-31
...] Environmental Impact Statement; Animal Carcass Management AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Notice of intent to prepare an environmental impact statement and proposed scope of study... management options used throughout the United States. This action will allow interested persons additional...
40 CFR 1502.9 - Draft, final, and supplemental statements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 34 2012-07-01 2012-07-01 false Draft, final, and supplemental... IMPACT STATEMENT § 1502.9 Draft, final, and supplemental statements. Except for proposals for legislation... supplemented. (a) Draft environmental impact statements shall be prepared in accordance with the scope decided...
40 CFR 1502.9 - Draft, final, and supplemental statements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 33 2011-07-01 2011-07-01 false Draft, final, and supplemental... IMPACT STATEMENT § 1502.9 Draft, final, and supplemental statements. Except for proposals for legislation... supplemented. (a) Draft environmental impact statements shall be prepared in accordance with the scope decided...
40 CFR 1502.9 - Draft, final, and supplemental statements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Draft, final, and supplemental... IMPACT STATEMENT § 1502.9 Draft, final, and supplemental statements. Except for proposals for legislation... supplemented. (a) Draft environmental impact statements shall be prepared in accordance with the scope decided...
40 CFR 1502.9 - Draft, final, and supplemental statements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 33 2014-07-01 2014-07-01 false Draft, final, and supplemental... IMPACT STATEMENT § 1502.9 Draft, final, and supplemental statements. Except for proposals for legislation... supplemented. (a) Draft environmental impact statements shall be prepared in accordance with the scope decided...
40 CFR 1502.9 - Draft, final, and supplemental statements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 34 2013-07-01 2013-07-01 false Draft, final, and supplemental... IMPACT STATEMENT § 1502.9 Draft, final, and supplemental statements. Except for proposals for legislation... supplemented. (a) Draft environmental impact statements shall be prepared in accordance with the scope decided...
44 CFR 10.10 - Preparation of environmental impact statements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Preparation of environmental impact statements. 10.10 Section 10.10 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT... Procedures § 10.10 Preparation of environmental impact statements. (a) Scoping. After determination that an...
44 CFR 10.10 - Preparation of environmental impact statements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 44 Emergency Management and Assistance 1 2012-10-01 2011-10-01 true Preparation of environmental impact statements. 10.10 Section 10.10 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT... Procedures § 10.10 Preparation of environmental impact statements. (a) Scoping. After determination that an...
44 CFR 10.10 - Preparation of environmental impact statements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Preparation of environmental impact statements. 10.10 Section 10.10 Emergency Management and Assistance FEDERAL EMERGENCY MANAGEMENT... Procedures § 10.10 Preparation of environmental impact statements. (a) Scoping. After determination that an...
Code of Federal Regulations, 2010 CFR
2010-01-01
... environmental impact statement. 51.104 Section 51.104 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED....104 NRC proceeding using public hearings; consideration of environmental impact statement. (a)(1) In... scope of NEPA and this subpart are in issue, the NRC staff may not offer the final environmental impact...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-30
... Management Plan for the Operation of Glen Canyon Dam AGENCY: Bureau of Reclamation and National Park Service... Impact Statement (EIS) for Adoption of a Long-term Experimental and Management Plan (LTEMP) for the Operation of Glen Canyon Dam to January 31, 2012. The Notice to Solicit Comments and Hold Public Scoping...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-02
... Environmental Impact Statement for General Management Plan/ Wilderness Study, Hawaii Volcanoes National Park... Service is expanding the scope of the Environmental Impact Statement (EIS) that is being prepared for updating the General Management Plan (GMP) for Hawaii Volcanoes National Park. As part of this conservation...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-18
...In accordance with the National Environmental Policy Act (NEPA), 42 U.S.C. 4321-4347, the Department of State (DOS) announces its intent to prepare an Environmental Impact Statement (EIS) and initiate the scoping process for the proposed agency action as specified below. The EIS will evaluate the impacts on the affected environment, including, but not limited to, socioeconomics, traffic and transportation, land use, historic and cultural resources, noise, air quality, environmental justice, and cumulative impacts.
Code of Federal Regulations, 2011 CFR
2011-01-01
... are the subject of an environmental impact statement and which represents projects of broad scope may... “Tiering” (§ 1508.28 of the CEQ Regulations) of environmental impact statements to relate such broad and...
Code of Federal Regulations, 2010 CFR
2010-01-01
... are the subject of an environmental impact statement and which represents projects of broad scope may... “Tiering” (§ 1508.28 of the CEQ Regulations) of environmental impact statements to relate such broad and...
Code of Federal Regulations, 2012 CFR
2012-01-01
... are the subject of an environmental impact statement and which represents projects of broad scope may... “Tiering” (§ 1508.28 of the CEQ Regulations) of environmental impact statements to relate such broad and...
Department of Energy Programmatic Environmental Impact Statement (PEIS) scoping session
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-12-31
The purpose of this programmatic environmental impact statement (PEIS) scoping meeting was: to present the ground water program so as to build some familiarity and understanding about the issue involved; and to get the Durango community`s input. This report contains the presentations made by the project manager for the uranium mill tailings program, site manager for the Durango UMTRA site, manager of ground water hydrology, and includes comments made by local residents.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-15
... Transmission Line Project Environmental Impact Statement (EIS) (DOE/EIS-0463). In anticipation of additional... anticipation of this information, DOE is reopening the public scoping period for an indefinite period. DOE will...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-13
... Pojoaque Basin Regional Water System Environmental Impact Statement, New Mexico AGENCY: Bureau of... Environmental Policy Act of 1969, as amended, the Bureau of Reclamation is preparing an environmental impact... document, alternatives, concerns, and issues to be addressed in the environmental impact statement. DATES...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 33 2011-07-01 2011-07-01 false Scoping. 1501.7 Section 1501.7 Protection of Environment COUNCIL ON ENVIRONMENTAL QUALITY NEPA AND AGENCY PLANNING § 1501.7 Scoping. There... as practicable after its decision to prepare an environmental impact statement and before the scoping...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Scoping. 1501.7 Section 1501.7 Protection of Environment COUNCIL ON ENVIRONMENTAL QUALITY NEPA AND AGENCY PLANNING § 1501.7 Scoping. There... as practicable after its decision to prepare an environmental impact statement and before the scoping...
Code of Federal Regulations, 2014 CFR
2014-07-01
... essential considerations of national policy. (b) The agency may: (1) Consider the following factors in...) Decision on whether to prepare an environmental impact statement (if not already decided). (ii) Determination of the scope of the environmental impact statement. (iii) Preparation of the draft environmental...
Code of Federal Regulations, 2013 CFR
2013-07-01
... essential considerations of national policy. (b) The agency may: (1) Consider the following factors in...) Decision on whether to prepare an environmental impact statement (if not already decided). (ii) Determination of the scope of the environmental impact statement. (iii) Preparation of the draft environmental...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-17
... environmental impacts of the construction and operation of the reservoir, raw water conveyances, associated... Preparation of Environmental Impact Statement for the Proposed Glades Reservoir AGENCY: Department of the Army... supply reservoir project to be located in Hall County, Georgia. The proposed project would be comprised...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-20
... DEPARTMENT OF THE INTERIOR Bureau of Ocean Energy Management Notice of Public Scoping Meetings on...), Interior. ACTION: Notice of public scoping meetings and request for comments. SUMMARY: The Proposed Outer... Congressionally-mandated leasing moratorium. This notice describes the public scoping process that BOEM is...
24 CFR 58.56 - Scoping process.
Code of Federal Regulations, 2013 CFR
2013-04-01
... Process: Procedures for Draft, Final and Supplemental Environmental Impact Statements § 58.56 Scoping... circumstances and factors as for the holding of public hearings under § 58.59. The responsible entity must wait...
24 CFR 58.56 - Scoping process.
Code of Federal Regulations, 2012 CFR
2012-04-01
... Process: Procedures for Draft, Final and Supplemental Environmental Impact Statements § 58.56 Scoping... circumstances and factors as for the holding of public hearings under § 58.59. The responsible entity must wait...
24 CFR 58.56 - Scoping process.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Process: Procedures for Draft, Final and Supplemental Environmental Impact Statements § 58.56 Scoping... circumstances and factors as for the holding of public hearings under § 58.59. The responsible entity must wait...
24 CFR 58.56 - Scoping process.
Code of Federal Regulations, 2011 CFR
2011-04-01
... Process: Procedures for Draft, Final and Supplemental Environmental Impact Statements § 58.56 Scoping... circumstances and factors as for the holding of public hearings under § 58.59. The responsible entity must wait...
24 CFR 58.56 - Scoping process.
Code of Federal Regulations, 2014 CFR
2014-04-01
... Process: Procedures for Draft, Final and Supplemental Environmental Impact Statements § 58.56 Scoping... circumstances and factors as for the holding of public hearings under § 58.59. The responsible entity must wait...
76 FR 49526 - Environmental Impact Statement; Saint Louis County, MN
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-10
... environmental impacts of alternatives, including (1) No-build, (2) Purchasing title and possession of the.... The Scoping Document/Draft Scoping Decision Document is anticipated to be published in late 2011. A... Decision Document will be published after the public comment period has closed. A Draft EIS will be...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Columbia River System Operation Review
1995-11-01
This Appendix J of the Final Environmental Impact Statement for the Columbia River System discusses impacts on the recreational activities in the region. Major sections include the following: scope and processes; recreation in the Columbia River Basin today - by type, location, participation, user characteristics, factors which affect usage, and managing agencies; recreation analysis procedures and methodology; and alternatives and their impacts.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-03
... Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement... Statement for the Nuclear Facility Portion of the Chemistry and Metallurgy Research Building Replacement... facility portion of the Chemistry and Metallurgy Research Building Replacement Project (CMRR-NF) at Los...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-04
... DEPARTMENT OF THE INTERIOR National Park Service Intent To Prepare an Environmental Impact Statement for the New Merced Wild and Scenic River Comprehensive Management Plan Yosemite National Park, Mariposa and Madera Counties, CA ACTION: Notice of second extension of public scoping period. SUMMARY...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-10
... Impact Statements To Incorporate Greater Sage-grouse Conservation Measures Into Land Use Plans and Land Management Plans AGENCY: Bureau of Land Management, Interior. ACTION: Notice of Correction. SUMMARY: The BLM... Supplemental EISs, extends the scoping period, and adds 11 Forest Service Land Management Plans (LMPs) to this...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-24
... Impact Statement for the Proposed Pokagon Band Tribal Village Fee-to-Trust Acquisition and Casino Project..., return address and the caption specifying ``Scoping Comments for Proposed Pokagon Band Tribal Village... Village, which will include 44 housing units, a multi-purpose facility, health service and other tribal...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-06
... scoping meeting to identify potential issues and content for inclusion in the environmental impact... 1000-room hotel, restaurants, retail establishments, entertainment facilities, a spa and health club... employee parking. Significant issues to be covered during the scoping process may include, but are not...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-15
...] Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Ocotillo Sol Solar Project... (ROW) authorization request for the Ocotillo Sol Solar Energy Facility (Project), a 15-18 megawatt (MW) solar energy facility. By this notice, the BLM is announcing the beginning of the scoping process to...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-26
... DEPARTMENT OF THE INTERIOR Bureau of Indian Affairs Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Ho-Chunk Nation Beloit Casino Project, City of Beloit, Rock County, WI... Beloit, Rock County, Wisconsin. This notice also announces a public scoping meeting to identify potential...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-12
... Intent To Prepare an Environmental Impact Statement for the Proposed Normally Pressured Lance Natural Gas...) Natural Gas Development Project and by this notice are announcing the beginning of the scoping process to... the NPL Natural Gas Development Project by any of the following methods: E-mail: [email protected
Early Restoration PEIS Public Scoping Meeting | NOAA Gulf Spill Restoration
Programmatic Environmental Impact Statement, or PEIS, to evaluate the potential environmental effects of types effects of early restoration. We are inviting the public to comment on the scope, content, and any other
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-31
... Environmental Impact Statement for the Proposed Naval Base Coronado Coastal Campus, San Diego, CA AGENCY... Register by the U.S. Environmental Protection Agency on June 29, 2012 (77 FR 38781) for the Department of... Base Coronado Coastal Campus in San Diego, California. The public scoping period ends on July 30, 2012...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-28
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF12-18-000; Docket No. PF12-20-000] Notice of Intent To Prepare an Environmental Impact Statement for the Proposed Oregon LNG Export Project and Washington Expansion Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meetings [[Page 59604
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-05
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PF12-4-000] Excelerate Energy L.P.; Notice of Intent To Prepare an Environmental Impact Statement for the Planned Aguirre Offshore Gasport Project, Request for Comments on Environmental Issues, and Notice of Public Scoping Meetings The staff of the Federal Energy Regulatory...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-29
... alternatives identified through an Alternatives Analysis study completed by the project. Early scoping for the alternatives analysis phase was previously announced in the Federal Register on September 27, 2010. Results of the alternatives analysis are described below. DATES: Written comments on the scope of alternatives...
77 FR 11171 - License Renewal Application for Callaway Plant, Unit 1, Union Electric Company
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-24
... Callaway Plant, Unit 1, Union Electric Company AGENCY: Nuclear Regulatory Commission. ACTION: Intent to prepare environmental impact statement and conduct scoping process. SUMMARY: Union Electric Company, a..., MO. The current operating license for Callaway expires on October 18, 2024. DATES: The public scoping...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-02
... DEPARTMENT OF THE INTERIOR Minerals Management Service Notice of Intent To Prepare and Scope an...-2017 AGENCY: Minerals Management Service, Interior. ACTION: Notice of intent and request for comments. SUMMARY: Pursuant to the National Environmental Policy Act (NEPA), the Minerals Management Service (MMS...
Code of Federal Regulations, 2012 CFR
2012-01-01
... addressed in environmental impact statements and for identifying the significant issues related to a... process must include considerations of the range of actions, alternatives, and impacts discussed in § 1508...; (i) Historical, archeological, and recreational factors; (j) Wetlands and floodplains; and (k...
Code of Federal Regulations, 2011 CFR
2011-01-01
... addressed in environmental impact statements and for identifying the significant issues related to a... process must include considerations of the range of actions, alternatives, and impacts discussed in § 1508...; (i) Historical, archeological, and recreational factors; (j) Wetlands and floodplains; and (k...
Code of Federal Regulations, 2010 CFR
2010-01-01
... addressed in environmental impact statements and for identifying the significant issues related to a... process must include considerations of the range of actions, alternatives, and impacts discussed in § 1508...; (i) Historical, archeological, and recreational factors; (j) Wetlands and floodplains; and (k...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-13
... the amount of water for farming activities but would continue to replace water allocated for other... management practices, impacts to environmental resources such as surface water, groundwater levels, land...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-25
... to ALCOM Public Affairs, 9480 Pease Avenue, Suite 120, JBER, AK 99506, Phone: 907-552-2341, Fax: 907... to advise the public of the extension to submit scoping comments. The initial Notice of Intent... assistance or translation services for the public scoping meetings in advance through the ALCOM Public...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-09
... Environmental Impact Statement; Scoping Meetings AGENCY: Office of National Marine Sanctuaries (ONMS), National... remains March 1, 2013. DATES: NOAA will accept public comments on the notice of intent published at 77 FR 75601 (December 21, 2012) through March 1, 2013. Dates for scoping meetings are: (1) January 24, 2013 at...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Columbia River System Operation Review
1995-11-01
This Appendix C of the Final Environmental Impact Statement for the Columbia River System discusses impacts on andromous fish and juvenile fish transportation. The principal andromous fish in the Columbia basin include salmonid species (Chinook, coho, and sockeye salmon, and steelhead) and nonsalmoinid andromous species (sturgeon, lamprey, and shad). Major sections in this document include the following: background, scope and process; affected environment for salmon and steelhead, shaded, lamprey, sturgeon; study methods; description of alternatives: qualitative and quantitative findings.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-26
... Impact Statement (GMP/EIS) for the Memorial in October 2009 and the record of Decision (ROD) was signed.... The 2009 GMP/EIS provided a broad analysis of potential impacts of the expansion of programs and...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-20
... Commission's 1996 findings on the environmental impacts of renewing the operating license of a nuclear power.... Specifically, the final rule amends Table B-1 by redefining the number and scope of the environmental impact... is publishing Revision 1 to NUREG-1437, ``Generic Environmental Impact Statement for License Renewal...
38 CFR 200.4 - Implementation of NEPA and related authorities.
Code of Federal Regulations, 2011 CFR
2011-07-01
... exclusions, environmental assessments, and environmental impact statements. (2) The Master Planner, is..., minimizing potential impacts in an effort to avoid a higher level of NEPA documentation. The scope of an... significant effects on public health, safety, or the environment. (B) Reasonable likelihood of significant...
38 CFR 200.4 - Implementation of NEPA and related authorities.
Code of Federal Regulations, 2014 CFR
2014-07-01
... exclusions, environmental assessments, and environmental impact statements. (2) The Master Planner, is..., minimizing potential impacts in an effort to avoid a higher level of NEPA documentation. The scope of an... significant effects on public health, safety, or the environment. (B) Reasonable likelihood of significant...
38 CFR 200.4 - Implementation of NEPA and related authorities.
Code of Federal Regulations, 2012 CFR
2012-07-01
... exclusions, environmental assessments, and environmental impact statements. (2) The Master Planner, is..., minimizing potential impacts in an effort to avoid a higher level of NEPA documentation. The scope of an... significant effects on public health, safety, or the environment. (B) Reasonable likelihood of significant...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-21
... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration RIN 0648-BB69 New England Fishery Management Council; Notice of Intent To Prepare an Environmental Impact Statement (EIS); Northeast Multispecies Fishery; Notice of Public Scoping Meetings; Correction AGENCY: National Marine Fisheries Service...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-26
... planning and environmental impact analysis process required to inform consideration of alternative... 5, 1996. Based on an analysis of the numerous scoping comments received, and with consideration of a... proper food storage; party size; camping and campsites; human waste management; stock use; meadow...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-25
..., identifying significant environmental issues in the DEIS/EIR, providing useful information such as published and unpublished data, and knowledge of relevant issues and recommending mitigation measures to offset... the scoping process. c. Individuals and agencies may offer information or data relevant to the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-30
... of the scoping process to solicit public comments and identify issues for the EIS. DATES: This notice initiates the public scoping process for the EIS. Comments on issues related to the EIS may be submitted in... April 2012. In mid-October 2012, NextEra Blythe Solar Energy Center, LLC (NBSEC), purchased the un-built...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-13
... Department of Transportation and Development (LA DOTD) to evaluate environmental and related impacts of... development of the scope of the EIS and to advise the public that outreach activities conducted by LA DOTD and..., potentially significant impacts to the natural and built environment of those alternatives, and to invite...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-11
...In compliance with the National Environmental Policy Act of 1969 (NEPA), as amended, and the Federal Land Policy and Management Act of 1976, as amended, the Bureau of Land Management (BLM) Hassayampa Field Office, Phoenix, Arizona, intends to prepare an Environmental Impact Statement (EIS) which may include discussion of an amendment to the Bradshaw-Harquahala Resource Management Plan (RMP), and by this notice is announcing the beginning of the scoping process to solicit public comments and identify issues.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-22
... completed in 1957 as an integral component of the Los Angeles County Drainage Area system of dams and... several measures including: emergency management preparedness, remote monitoring, increased inspections... Scope of Analysis. The EIS will also evaluate the impacts of alternatives on environmental resources...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-06
... other CVP contractors, to Reclamation's Refuge Water Supply Program (RWSP) for delivery to the San... livestock and/or municipal and industrial uses because of water supply shortages or when full contract... Contractors Water Authority's 25-Year Water Transfer Program 2014 to 2038, California AGENCY: Bureau of...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-31
..., travel times, and corridor safety. DATES: The date, time, and location for the public scoping meetings... mobility, travel times, and corridor safety while minimizing adverse environmental impacts. The RPRP would provide travelers and commuters with a new mobility option that would achieve more-efficient travel times...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-10
...Pursuant to the National Environmental Policy Act (NEPA), NHTSA plans to prepare an Environmental Impact Statement (EIS) to analyze the potential environmental impacts of the agency's Corporate Average Fuel Economy program for passenger automobiles (referred to herein as ``passenger cars'') and non-passenger automobiles (referred to herein as ``light trucks''). The EIS will consider the potential environmental impacts of new fuel economy standards for model years 2017-2025 passenger cars and light trucks that NHTSA will be proposing pursuant to the Energy Independence and Security Act of 2007. This notice initiates the NEPA scoping process by inviting comments from Federal, State, and local agencies, Indian tribes, and the public to help identify the environmental issues and reasonable alternatives to be examined in the EIS. This notice also provides guidance for participating in the scoping process and additional information about the alternatives NHTSA expects to consider in its NEPA analysis. In preparing this notice, NHTSA has shared the document with the Council on Environmental Quality (CEQ), the Environmental Protection Agency (EPA), and the Department of Energy (DOE).
Broadening GHG accounting with LCA: application to a waste management business unit.
Fallaha, Sophie; Martineau, Geneviève; Bécaert, Valérie; Margni, Manuele; Deschênes, Louise; Samson, Réjean; Aoustin, Emmanuelle
2009-11-01
In an effort to obtain the most accurate climate change impact assessment, greenhouse gas (GHG) accounting is evolving to include life-cycle thinking. This study (1) identifies similarities and key differences between GHG accounting and life-cycle assessment (LCA), (2) compares them on a consistent basis through a case study on a waste management business unit. First, GHG accounting is performed. According to the GHG Protocol, annual emissions are categorized into three scopes: direct GHG emissions (scope 1), indirect emissions related to electricity, heat and steam production (scope 2) and other indirect emissions (scope 3). The LCA is then structured into a comparable framework: each LCA process is disaggregated into these three scopes, the annual operating activities are assessed, and the environmental impacts are determined using the IMPACT2002+ method. By comparing these two approaches it is concluded that both LCA and GHG accounting provide similar climate change impact results as the same major GHG contributors are determined for scope 1 emissions. The emissions from scope 2 appear negligible whereas emissions from scope 3 cannot be neglected since they contribute to around 10% of the climate change impact of the waste management business unit. This statement is strengthened by the fact that scope 3 generates 75% of the resource use damage and 30% of the ecosystem quality damage categories. The study also shows that LCA can help in setting up the framework for a annual GHG accounting by determining the major climate change contributors.
Code of Federal Regulations, 2010 CFR
2010-07-01
... at an early stage the significant environmental issues deserving of study and deemphasizing insignificant issues, narrowing the scope of the environmental impact statement accordingly. (e) Providing a... Protection of Environment COUNCIL ON ENVIRONMENTAL QUALITY NEPA AND AGENCY PLANNING § 1501.1 Purpose. The...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-03
... associated pads, access roads, gas and water pipelines, screw compressors and overhead electric lines. This... projected air quality impacts. The project was initially scoped from October 29 to December 12, 2008, for 55..., the BLM has identified the following preliminary issues: Air quality; water quality and supply...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-31
... scope of the action alternative which include acreage, water supply, and general site locations would... authorized boundary with a surface water supply as part of continued phased development of the CBP. The... alternative impacts considered in the Draft EIS. Two water supply options are being considered that would use...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-28
... NUCLEAR REGULATORY COMMISSION [Docket No. 50-346; NRC-2010-0298] FirstEnergy Nuclear Operating Company; Notice of Intent To Prepare an Environmental Impact Statement and Conduct the Scoping Process for Davis-Besse Nuclear Power Station, Unit 1 FirstEnergy Nuclear Operating Company (FENOC) has submitted an application for renewal of Facility...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-05
... DEPARTMENT OF DEFENSE Department of the Navy Notice of Intent To Prepare an Environmental Impact... To Announce Public Scoping Meetings AGENCY: Department of the Navy, DoD. ACTION: Notice. SUMMARY... Council on Environmental Quality regulations (40 CFR Parts 1500-1508), the Department of the Navy (DoN...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-07
... studies that are underway. 5. Scoping Process: The Corps and County Parks will jointly conduct a series of... development of the EIS/EIR and associated technical studies are being completed to determine the Agency... Association of Governments (SANDAG). The EIR/EIS is currently evaluating three alternative restoration designs...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-23
...The Bureau of Reclamation is reopening the comment period for the scoping process. The public comment period will now end on May 6, 2013. We published the notice of intent in the Federal Register on March 4, 2013 (78 FR 14117). The public comment period originally ended on April 3, 2013.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-04
... environmental requirements of offshore drilling in response to the Deepwater Horizon incident and that a new..., Chukchi Sea, and Beaufort Sea areas offshore Alaska will continue to be considered for potential leasing...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-17
..., and an alternatives analysis study. Early scoping notification for the alternatives analysis phase was... alternatives analysis findings, and other background technical reports are available on the project Web site... about the proposed [[Page 36299
Department of Energy PEIS scoping session
DOE Office of Scientific and Technical Information (OSTI.GOV)
Badar, L
1992-12-10
This is the second programmatic environmental impact statement scoping session held in Durango, Colorado. The purpose was: to present the ground water program so as to build some familiarity and understanding about the issue involved; and to get Durango community's input. Scoping is the collection of information and getting everyone involved and really making a team out of coming up with a proposed action. This report contains the presentations made by the project manager for the Uranium Mill Tailings (UMTRA) program, site manager for the Durango UMTRA site, manager of ground water hydrology, and include comments made by local residents.
76 FR 31676 - Environmental Impact Statements: National Summary of Rescinded Notices of Intent
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-01
.../2006 2/10/2011 Dock) in Seattle. WA Forest Road 56 in King County..... 4/27/2001 2/28/2011 (Catalog of... CE. The Forest Road 56 improvement project in King County, Washington, has been reduced in scope and...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-03
.... ADDRESSES: Comments will be accepted at the public scoping meetings or they may be sent to Mr. Steve Hands... crucial transit asset into a state of good repair, while reducing travel times, improving access to job...
The overall purpose of the PEIS is to review and evaluate the NWP program as a whole, to ensure that the NWP program authorizes only those activities with minimal individual and cumulative adverse environmental effects on the aquatic environment.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-10
... in this area have been measured in excess of 250,000 milligrams per liter; by far one of the most concentrated sources in the Colorado River Basin. Groundwater then surfaces into the Dolores River. Studies...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-17
...The Centers for Disease Control and Prevention (CDC) within the Department of Health and Human Services (HHS) announces its intent to prepare an Environmental Impact Statement (EIS) for the proposed 2015-2025 Facilities Master Plan for HHS/CDC's Edward R. Roybal Campus located at 1600 Clifton Road NE., in Atlanta, Georgia. This announcement follows the requirements of the National Environmental Policy Act of 1969 (NEPA) as implemented by the Council on Environmental Quality (CEQ) Regulations (40 CFR Part 1500-1508); and, the Department of Health and Human Services (HHS) General Administration Manual Part 30 Environmental Procedures, dated February 25, 2000.
10 CFR 51.95 - Postconstruction environmental impact statements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... the storage of spent fuel for the nuclear power plant within the scope of the generic determination in... a license to store spent fuel at a nuclear power reactor after expiration of the operating or... Section 51.95 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR...
10 CFR 51.95 - Postconstruction environmental impact statements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... the storage of spent fuel for the nuclear power plant within the scope of the generic determination in... a license to store spent fuel at a nuclear power reactor after expiration of the operating or... Section 51.95 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR...
Penm, Jonathan; Chaar, Betty; Moles, Rebekah J
2016-01-01
The Basel statements of the International Pharmaceutical Federation, which provide the first global, unified vision for the hospital pharmacy profession, have recently been revised. Originally released in 2008, the Basel statements have since been made available in 21 languages, and thus have the potential for great impact around the world. To conduct a scoping review to examine the extent and nature of research activity related to the Basel statements. Google Scholar, PubMed, and International Pharmaceutical Abstracts were searched using the key term "Basel statements" for relevant research articles. From each included study, data were extracted on geographic location, study design, study outcomes, and use of the Basel statements. The search strategy generated 113 results. Further refinement resulted in 14 English-language articles that met the inclusion criteria. Four of these articles focused on adapting the Basel statements to European practice, an initiative of the European Association of Hospital Pharmacists that led to development of the European statements of Hospital Pharmacy. Six studies focused on monitoring hospital pharmacy practice in Uganda, the Pacific island countries, and the Western Pacific Region. These studies provide valuable baseline data to measure and track the development of hospital pharmacy practices in their respective countries and regions. The remaining 4 studies used qualitative methods to explore the barriers to and facilitators of implementation of the Basel statements in South Africa, China, and Australia. The Basel statements have led to multiple initiatives around the world, involving more than 70 countries. The European and Western Pacific regions have been the most active. Current initiatives should be continued to ensure identification and resolution of issues related to sustaining their use over time.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-30
... of settlement negotiations among New York (NY) State agencies, Champlain Hudson Power Express, Inc.... Subsequently, the Applicant entered into settlement negotiations with several parties regarding the proposed... negotiations resulted in a ``Joint Proposal'' which includes a proposed project alignment and configuration...
77 FR 32082 - New England Fishery Management Council (NEFMC); Public Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-31
... scope and significance of issues to be analyzed in a draft environmental impact statement on management... Management Council (NEFMC); Public Meeting AGENCY: National Marine Fisheries Service (NMFS), National Oceanic... England Fishery Management Council (Council) will hold a three-day meeting on June 19-21, 2012 to consider...
75 FR 74042 - Intent To Prepare an Environmental Impact Statement and To Conduct Scoping Meetings...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-30
... proposed Project would consist of up to 100 wind turbine generators with a combined total generating... its wind generation turbines and related facilities. Available overview information indicates this... process for the wind turbine strings and associated facilities considered sensitive resources, and the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-31
... scope of the NEPA review by contacting the NRC Project Manager, Mr. Tam Tran, by telephone at 800-368-5642, extension 3617, or by e-mail at Tam[email protected] no later than February 23, 2011. Members of the...
75 FR 71179 - Environmental Impact Statement: San Diego County, CA
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-22
... Diego County, CA AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of intent. SUMMARY... a proposed highway project in San Diego County, California. DATES: Public Scoping Meeting: January 12, 2011; 5 p.m. to 8 p.m. ADDRESSES: Sherman Heights Community Center, 2258 Island Avenue, San Diego...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-14
..., living resources and maritime archaeological resources and the human activities that affect them. The... of Review of Management Plan/Regulations of the Hawaiian Islands Humpback Whale National Marine Sanctuary; Intent To Prepare Draft Environmental Impact Statement and Management Plan; Scoping Meetings...
75 FR 4842 - Winter Use Plan, Environmental Impact Statement, Yellowstone National Park
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-29
... establish a management framework that allows the public to experience Yellowstone's unique winter resources... the environmental effects of winter use on air quality and visibility, wildlife, natural soundscapes... U.S. Forest Service. A scoping brochure has been prepared that details the issues identified to date...
75 FR 54419 - Environmental Impact Statement: Yellowstone County, MT
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-07
... be prepared for a proposed highway project in Yellowstone County, Montana. FOR FURTHER INFORMATION... that an EIS will be prepared on the re-scoped, proposed project. These improvements are considered... be prepared for a proposal to construct a bypass route north of the city of Billings. Funding...
75 FR 39555 - Environmental Impact Statement; Fort Hamer Bridge, Manatee County, FL
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-09
..., Florida. This includes suggesting analyses, methodologies and possible sources of data or information... and written comments relating to the proposed Fort Hamer Bridge and the preparation of an EIS. This... EIS or possible sources of data or information we should consider. Public Scoping Meeting The Public...
29 CFR 11.11 - Development of environmental analyses and documents.
Code of Federal Regulations, 2011 CFR
2011-07-01
... development indicates that preparation of an environmental impact statement will be required, the agency shall begin preparation of such a document by initiating the scoping process in accordance with 40 CFR 1501.7. However, if the information is not clearly indicative of the need for preparation of an environmental...
Penm, Jonathan; Chaar, Betty; Moles, Rebekah J
2016-01-01
Background: The Basel statements of the International Pharmaceutical Federation, which provide the first global, unified vision for the hospital pharmacy profession, have recently been revised. Originally released in 2008, the Basel statements have since been made available in 21 languages, and thus have the potential for great impact around the world. Objective: To conduct a scoping review to examine the extent and nature of research activity related to the Basel statements. Methods: Google Scholar, PubMed, and International Pharmaceutical Abstracts were searched using the key term “Basel statements” for relevant research articles. From each included study, data were extracted on geographic location, study design, study outcomes, and use of the Basel statements. Results: The search strategy generated 113 results. Further refinement resulted in 14 English-language articles that met the inclusion criteria. Four of these articles focused on adapting the Basel statements to European practice, an initiative of the European Association of Hospital Pharmacists that led to development of the European statements of Hospital Pharmacy. Six studies focused on monitoring hospital pharmacy practice in Uganda, the Pacific island countries, and the Western Pacific Region. These studies provide valuable baseline data to measure and track the development of hospital pharmacy practices in their respective countries and regions. The remaining 4 studies used qualitative methods to explore the barriers to and facilitators of implementation of the Basel statements in South Africa, China, and Australia. Conclusion: The Basel statements have led to multiple initiatives around the world, involving more than 70 countries. The European and Western Pacific regions have been the most active. Current initiatives should be continued to ensure identification and resolution of issues related to sustaining their use over time. PMID:27168634
DOE Office of Scientific and Technical Information (OSTI.GOV)
United States. Bonneville Power Administration.
In regard to the proposed Tenaska Washington II Generation Project, the goal of the Bonneville Power Administration`s (BPA) Environmental Impact Statement (EIS) public involvement process is to determine the issues to be examined and pertinent analyses to be conducted and to solicit comments on the content and quality of information presented in the Draft Environmental Impact Statement (DEIS). Comments and questions are solicited from the public and government agencies during the scoping process and during the comment period and public hearing on the DEIS, to find out what is of most concern to them. The end product of the publicmore » involvement process is the Comment Report which follows in part of this volume on Public Involvement.« less
40 CFR 21.10 - Utilization of the statement.
Code of Federal Regulations, 2010 CFR
2010-07-01
... a statement is issued under § 21.5 is substantively changed in scope, concept, design, or capability... financial assistance: Provided, That there is or will be no substantive change in the scope, concept, design...
ERIC Clearinghouse Scope of Interest Guide. ERIC Processing Manual, Appendix A.
ERIC Educational Resources Information Center
Brandhorst, Ted, Ed.; And Others
This guide identifies and describes the subject areas covered by the ERIC Clearinghouses. Each Clearinghouse scope statement is provided in the following three-part format: (1) Formal Statement--A comprehensive and detailed description of the scope areas, mainly for use by the ERIC Facility in assigning documents (on the basis of their subject…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-14
... Energy Program (HIREP). Hawai`i proposes to facilitate the development of wind-generated electric energy and the required improvements to the existing electric transmission infrastructure in Hawai`i. This... energy technologies in Hawai`i. DATES: The public scoping period starts with the publication of this...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-14
..., Inc. (SWG-2011-00511) for the proposed approximately 300-turbine offshore wind farm located in the... and operation of the offshore wind farm, associated facilities, and appurtenances and is intended to... EIS on the proposed Baryonyx offshore wind farm which would include the proposed construction of...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-23
... of Wetlands Involvement AGENCY: National Nuclear Security Administration (NNSA), U.S. Department of... scoping meeting, and notice of wetlands involvement. SUMMARY: Pursuant to the National Environmental... BFC known as the Kansas City Plant (KCP), consisting of approximately 122 acres and 38 buildings. GSA...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-16
..., recreation, water quality, and water supply. Public scoping for the MRAPS will begin in late May 2010. Future..., irrigation, navigation, power, recreation, water quality, and water supply. Section 108 of the Energy and... and wildlife, irrigation, power, recreation, water supply, and water quality control; defining the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-25
... involvement associated with the proposed action is the discharge or dredged or fill material into waters of... affect navigable waters. Federal authorizations for the proposed project would constitute a ``major... sedimentation settling basin. c. An approximate 20-acre sedimentation settling and storage basin. d. An...
32 CFR 651.50 - Public interaction phase.
Code of Federal Regulations, 2010 CFR
2010-07-01
... representatives of any Army-contracted consulting firm, if one has been retained to participate in writing the EIS... or will be prepared that are related to but are not part of the scope of the impact statement under.... It is a working session where the gathering and evaluation of information relating to potential...
75 FR 74040 - Intent To Prepare an Environmental Impact Statement and To Conduct Scoping Meetings...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-30
... Proposed Project NextEra's proposed Project would consist of up to 100 wind turbine generators with a... roads. NextEra has secured leases with willing landowners for its wind generation turbines and related... substantial natural resources conflicts. NextEra's siting process for the wind turbine strings and associated...
45 CFR 640.5 - Responsibilities and procedures for preparation of an environmental impact statement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... statutory requirements or in case of emergency circumstances, as described in 40 CFR 1506.11. (5) The... followed. (6) The responsible directorate shall examine carefully the basis on which supportive studies have been conducted to assure that such studies are objective and comprehensive in scope and in depth...
45 CFR 640.5 - Responsibilities and procedures for preparation of an environmental impact statement.
Code of Federal Regulations, 2012 CFR
2012-10-01
... statutory requirements or in case of emergency circumstances, as described in 40 CFR 1506.11. (5) The... followed. (6) The responsible directorate shall examine carefully the basis on which supportive studies have been conducted to assure that such studies are objective and comprehensive in scope and in depth...
45 CFR 640.5 - Responsibilities and procedures for preparation of an environmental impact statement.
Code of Federal Regulations, 2013 CFR
2013-10-01
... statutory requirements or in case of emergency circumstances, as described in 40 CFR 1506.11. (5) The... followed. (6) The responsible directorate shall examine carefully the basis on which supportive studies have been conducted to assure that such studies are objective and comprehensive in scope and in depth...
45 CFR 640.5 - Responsibilities and procedures for preparation of an environmental impact statement.
Code of Federal Regulations, 2014 CFR
2014-10-01
... statutory requirements or in case of emergency circumstances, as described in 40 CFR 1506.11. (5) The... followed. (6) The responsible directorate shall examine carefully the basis on which supportive studies have been conducted to assure that such studies are objective and comprehensive in scope and in depth...
45 CFR 640.5 - Responsibilities and procedures for preparation of an environmental impact statement.
Code of Federal Regulations, 2011 CFR
2011-10-01
... statutory requirements or in case of emergency circumstances, as described in 40 CFR 1506.11. (5) The... followed. (6) The responsible directorate shall examine carefully the basis on which supportive studies have been conducted to assure that such studies are objective and comprehensive in scope and in depth...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-28
... Petroleum Reserve-- Alaska AGENCY: Bureau of Land Management, Interior. ACTION: Notice of Intent. SUMMARY... Petroleum Reserve-Alaska (NPR-A) planning area. This notice announces the beginning of the scoping period to... acres underlying Native Corporation-owned surface lands. The Naval Petroleum Reserves Production Act (42...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-12
... are highest during the morning eastbound commute and the evening westbound commute, but the bridge is..., agencies, and the public during the scoping process. 4. Probable Effects The EIS will consider in detail the potential environmental effects of the alternatives under consideration based on the current...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-30
..., migration, breathing, nursing, breeding, feeding, or sheltering [Level B harassment].'' Authorization for... energy demands. Substantive comments received during the public scoping period have been addressed in the... Exploration Activity: Alternative 2 analyzes a certain amount of 2D/3D seismic, site clearance and high...
10 CFR 51.95 - Postconstruction environmental impact statements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... determined by the Commission, a supplement on the operation of a nuclear power plant will not include a... the storage of spent fuel for the nuclear power plant within the scope of the generic determination in... the renewal of an operating license or combined license for a nuclear power plant under parts 52 or 54...
Benchmarking performance: Environmental impact statements in Egypt
DOE Office of Scientific and Technical Information (OSTI.GOV)
Badr, El-Sayed A., E-mail: ebadr@mans.edu.e; Zahran, Ashraf A., E-mail: ashraf_zahran@yahoo.co; Cashmore, Matthew, E-mail: m.cashmore@uea.ac.u
Environmental impact assessment (EIA) was formally introduced in Egypt in 1994. This short paper evaluates 'how well' the EIA process is working in practice in Egypt, by reviewing the quality of 45 environmental impact statements (EISs) produced between 2000 and 2007 for a variety of project types. The Lee and Colley review package was used to assess the quality of the selected EISs. About 69% of the EISs sampled were found to be of a satisfactory quality. An assessment of the performance of different elements of the EIA process indicates that descriptive tasks tend to be performed better than scientificmore » tasks. The quality of core elements of EIA (e.g., impact prediction, significance evaluation, scoping and consideration of alternatives) appears to be particularly problematic. Variables that influence the quality of EISs are identified and a number of broad recommendations are made for improving the effectiveness of the EIA system.« less
7 CFR 3052.500 - Scope of audit.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AGRICULTURE AUDITS OF STATES, LOCAL GOVERNMENTS, AND NON-PROFIT ORGANIZATIONS Auditors § 3052.500 Scope of... statements. The auditor shall determine whether the financial statements of the auditee are presented fairly in all material respects in conformity with generally accepted accounting principles. The auditor...
7 CFR 3052.500 - Scope of audit.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AGRICULTURE AUDITS OF STATES, LOCAL GOVERNMENTS, AND NON-PROFIT ORGANIZATIONS Auditors § 3052.500 Scope of... statements. The auditor shall determine whether the financial statements of the auditee are presented fairly in all material respects in conformity with generally accepted accounting principles. The auditor...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-06
... the operation of the U.S. electric power supply system under normal and contingency conditions), and... construction, operation, maintenance, and connection of the proposed new electric transmission line across the..., The Outback Pub at The Spa Restaurant, 869 Washington Street, Thursday, September 26, 2013, 5-8 p.m...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-09
... System Management (TSM), Bus Rapid Transit (BRT), and Commuter Rail. The AA/EIS will be prepared in.... Transportation System Management (TSM) Alternative: A TSM Alternative, which reflects the best that can be done... regulations. The AA/EIS process provides opportunities for the public to comment on the scope of the EIS...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-12
... the carbon emissions of its generating system and take advantage of lower carbon dioxide-emitting.... The SEIS will include examination of a range of supply-side and demand- side management options for... both the scope of alternatives and environmental issues that should be addressed as part of the SEIS...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-22
... natural gas pipelines, the Midwestern Gas Transmission line (3 miles distant) and/or the ANR Pipeline (4.5... Pipeline, Boardwalk/Texas Gas Pipeline, Shell/Capline Oil Pipeline, Panhandle/Trunkline Gas Pipeline, and... Rockport, IN, and CO 2 Pipeline; Conduct Additional Public Scoping Meetings; and Issue a Notice of...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-12
... Industrial Water Supply From the Buford Dam/Lake Lanier Project AGENCY: Department of the Army, U.S. Army... accommodate municipal and industrial water supply from the Buford Dam/Lake Lanier project. The Corps is... also consider, along with operations for all authorized purposes, an expanded range of water supply...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-08
... terms and conditions regarding the constraints on availability of water supply for the CVP M&I water service contracts. Allocation of CVP water supplies for any given water year is based upon forecasted... requirements, and management of Section 3406(b)(2) resources and refuge water supplies in accordance with CVPIA...
76 FR 4088 - Notice of Intent To Prepare an Environmental Impact Statement
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-24
..., USDA, ARS, Pacific West Area, ATTN: USSES Grazing Project 2010 Scoping. E-mail comments to: [email protected] the ARS Web site at: http://www.ars.usda.gov/main/site_main.htm?modecode=53-64-00-00 under ``News and... administrative review or judicial review. Dated: November 22, 2010. Edward B. Knipling, Administrator, ARS. [FR...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-20
... wind turbine generators and associated infrastructure located across approximately 15,725 acres of land... construction, operation, and maintenance of the three wind energy projects. \\2\\ Burleigh County Wind Energy... Preservation Act. Section 7 and 106 consultations were completed in 2010 on some of the proposed wind turbine...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-06
... DEPARTMENT OF THE INTERIOR Bureau of Reclamation [A10-1523-2000-229-00-0-1, 3205000] Notice of... Apache Tribe Rural Water System Project, Arizona AGENCY: Bureau of Reclamation, Interior. ACTION: Notice... Act of 2010), the United States Congress authorized and directed Reclamation to plan, design, and...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-10
... availability of the infrastructure needed to support the transfer, handling, examination, and packaging of... nuclear fuel is transferred into dry storage containers and placed into temporary storage at NRF, prior to... Container System for Management of Naval Spent Nuclear Fuel (DOE/EIS-0251). Ongoing efforts to sustain the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-15
....C. 1131-36) and other laws and policies, will frame the decision-making for the CRMP/EIS. The CRMP...-action and a preferred alternative. The potential environmental effects of each alternative will be... decisions related to this project are invited to participate in the scoping process and, if eligible, may...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-12
... beginning of the scoping process to solicit public comments regarding issues and resource information for... Lander Field Office intends to prepare an EIS to inform decision-making regarding the proposed Lower Gas... of the proposed Project is to explore for and identify mining reserves and extract and process...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-06
... Experimental and Management Plan for the Operation of Glen Canyon Dam AGENCY: Bureau of Reclamation and... Interior (Secretary) Ken Salazar announced that the development of a Long-Term Experimental and Management... GCDAMP includes a Federal advisory committee known as the Glen Canyon Dam Adaptive Management Work Group...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-27
... acres (4,287 acres would be disturbed by the mining operations, highwall reduction, soil storage, scoria... WECo currently uses in other permitted areas of the Rosebud Mine. In advance of each mining pass, soil... expose the coal seam. Overburden stockpiles, soil stockpiles, and scoria pits would be developed adjacent...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-24
... in the Arctic Ocean AGENCY: National Marine Fisheries Service (NMFS), National Oceanic and...., seismic surveys and exploratory drilling) in the Arctic Ocean (U.S. Chukchi and Beaufort Seas). DATES: The... found on the Protected Resources webpage at: http://www.nmfs.noaa.gov/pr/permits/eis/arctic.htm . FOR...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-25
... Area Oil and Gas Development Project, Duchesne and Uintah Counties, UT AGENCY: Bureau of Land... alternatives for oil and natural gas resources in the Monument Butte Area. This notice announces the public... BLM-administered public lands within the analysis area. Implementation of oil and gas development in...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-22
.... For commenting purposes under NEPA, written comments on the scope of the SDEIS should be directed to... Boulevard, Suite 500, St. Louis Park, MN 55426, Telephone: 612-373-3808; Email: [email protected] on July 22, 2013, with the 20 day period for submitting written comments ending on August 12, 2013...
78 FR 59414 - Environmental Impact Statement; King County, Washington
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-26
... Island, and partial tolls collected on trips within a segment. In addition to these three tolling... improvements on I-90. The total length of the corridor is approximately seven (7) miles. The scoping period for... centers over Lake Washington, a 22-mile-long body of water. The FHWA is issuing this notice to advise the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-25
...The U.S. Department of Agriculture, Forest Service, Tongass National Forest will prepare a supplemental environmental impact statement (SEIS) to a 2008 programmatic environmental impact statement (PEIS) titled Geothermal Leasing in the Western United States. This analysis is needed for consent determination to allow the Bureau of Land Management (BLM) to issue three pending leases to a private geothermal developer. These leases encompass much of Bell Island and a portion of the Cleveland Peninsula on the adjacent mainland in the Alexander Archipelago of Southeast Alaska. The agency invites comments and suggestions on the scope of the analysis to be included in the draft SEIS. In addition, the agency gives notice of this environmental analysis and decision making process so that interested and affected people know how they may participate and contribute to the final decision.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-23
...Marine Corps Forces, Pacific (MARFORPAC), as the Executive Agent designated by the United States (U.S.) Pacific Command (PACOM), is extending the public scoping comment period for the Commonwealth of the Northern Mariana Islands (CNMI) Joint Military Training Environmental Impact Statement (EIS)/Overseas EIS (OEIS) until May 13, 2013. A Notice of Intent (NOI) was published in the Federal Register on Thursday, March 14, 2013 (Vol. 78, No. 50, Pages 16257-16259). The Notice announced the initial public scoping comment period, including three public scoping meetings that took place on Wednesday, April 10, 2013; Thursday, April 11, 2013 and Friday, April 12, 2013. The public scoping meetings provided an opportunity for the public to obtain additional information and provide comments on the proposed action. The NOI requested the submission of all public scoping comments to MARFORPAC by April 29, 2013 Chamorro Standard Time (ChST). With this Notice, MARFORPAC is extending the public scoping comment period until May 13, 2013 (ChST).
29 CFR 99.500 - Scope of audit.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Secretary of Labor AUDITS OF STATES, LOCAL GOVERNMENTS, AND NON-PROFIT ORGANIZATIONS Auditors § 99.500 Scope...) Financial statements. The auditor shall determine whether the financial statements of the auditee are... auditor shall also determine whether the schedule of expenditures of Federal awards is presented fairly in...
29 CFR 99.500 - Scope of audit.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Secretary of Labor AUDITS OF STATES, LOCAL GOVERNMENTS, AND NON-PROFIT ORGANIZATIONS Auditors § 99.500 Scope...) Financial statements. The auditor shall determine whether the financial statements of the auditee are... auditor shall also determine whether the schedule of expenditures of Federal awards is presented fairly in...
10 CFR 1706.1 - Scope; statement of policy.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 4 2011-01-01 2011-01-01 false Scope; statement of policy. 1706.1 Section 1706.1 Energy DEFENSE NUCLEAR FACILITIES SAFETY BOARD ORGANIZATIONAL AND CONSULTANT CONFLICTS OF INTERESTS § 1706.1... the Defense Nuclear Facilities Safety Board will follow in determining whether a contractor or offeror...
10 CFR 1706.1 - Scope; statement of policy.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false Scope; statement of policy. 1706.1 Section 1706.1 Energy DEFENSE NUCLEAR FACILITIES SAFETY BOARD ORGANIZATIONAL AND CONSULTANT CONFLICTS OF INTERESTS § 1706.1... the Defense Nuclear Facilities Safety Board will follow in determining whether a contractor or offeror...
10 CFR 1706.1 - Scope; statement of policy.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 4 2013-01-01 2013-01-01 false Scope; statement of policy. 1706.1 Section 1706.1 Energy DEFENSE NUCLEAR FACILITIES SAFETY BOARD ORGANIZATIONAL AND CONSULTANT CONFLICTS OF INTERESTS § 1706.1... the Defense Nuclear Facilities Safety Board will follow in determining whether a contractor or offeror...
10 CFR 1706.1 - Scope; statement of policy.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 4 2012-01-01 2012-01-01 false Scope; statement of policy. 1706.1 Section 1706.1 Energy DEFENSE NUCLEAR FACILITIES SAFETY BOARD ORGANIZATIONAL AND CONSULTANT CONFLICTS OF INTERESTS § 1706.1... the Defense Nuclear Facilities Safety Board will follow in determining whether a contractor or offeror...
10 CFR 1706.1 - Scope; statement of policy.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 4 2014-01-01 2014-01-01 false Scope; statement of policy. 1706.1 Section 1706.1 Energy DEFENSE NUCLEAR FACILITIES SAFETY BOARD ORGANIZATIONAL AND CONSULTANT CONFLICTS OF INTERESTS § 1706.1... the Defense Nuclear Facilities Safety Board will follow in determining whether a contractor or offeror...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-19
... gasify the coal and petcoke to produce synthesis gas (syngas), which would then be purified to produce a... pipeline to the adjacent Elk Hills Oil Field (owned and operated by Occidental of Elk Hills, Inc. (OEHI..., Gas and Geothermal Resources (DOGGR). Pursuant to California law and a grant of primacy from the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-08
...-FF08RSDC00] Otay River Estuary Restoration Project; South San Diego Bay Unit and Sweetwater Marsh Unit of the... scoping with regard to the environmental impact statement (EIS) for the proposed Otay River Estuary... one of the following methods. Email: [email protected] . Please include ``Otay Estuary NOI'' in the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-08
..., Division of Environmental Protection, Office of Research Facilities, NIH, B13/2S11, 9000 Rockville Pike... Environmental Protection, Office of Research Facilities, NIH, B13/2S11, 9000 Rockville Pike, Bethesda, Maryland... INFORMATION: NIH is the focal point of the federal government for health research and is one of the world's...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-04
... the battalion level as they train at home station to deploy to support operations abroad. This action... Training Strategy has placed a focus on the conduct of battalion level maneuver training at home station... could occur to socio-economics and land use. The public is invited to participate in the scoping process...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-09
... Jump Creek, Succor Creek, and Cow Creek Watersheds in the Owyhee Field Office of the Boise District, ID... may submit comments and issues related to the Jump Creek, Succor Creek, and Cow Creek Watersheds... Creek, Succor Creek, and Cow Creek areas, and announces the beginning of the scoping process. The area...
Code of Federal Regulations, 2010 CFR
2010-01-01
... storage of spent fuel for the nuclear power plant within the scope of the generic determination in § 51.23..., and 51.73. The contribution of the environmental effects of the uranium fuel cycle activities....71, 51.72, 51.73, and this section. The contribution of the environmental effects of the uranium fuel...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-30
... telecommunications device for the deaf may call the Federal Relay Service (FedRelay) at 1-800-877- 8339 TTY/ASCII to contact the above individual during normal business hours. The FedRelay is available 24 hours a day, 7.... Groundwater Storage; 5. Habitat/Watershed Protection and Enhancement; 6. Enhanced Water Conservation; and 7...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-30
... the deaf may call the Federal Relay Service (FedRelay) at 1-800-877- 8339 TTY/ASCII to contact the above individual during normal business hours. The FedRelay is available 24 hours a day, 7 days a week...; 5. Habitat/Watershed Protection and Enhancement; 6. Enhanced Water Conservation; and 7. Market...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-05
... DEPARTMENT OF DEFENSE Department of the Army, Corps of Engineers Notice of Intent To Prepare an... Corps of Engineers, DoD. ACTION: Notice of Intent. Authority: 33 U.S.C. 403; 33 U.S.C. 1344; 33 U.S.C... Engineers, Los Angeles District, Regulatory Division, Ventura Field Office, ATTN: SPL-2013-00113-TS, 2151...
Investigating potential effects of heli-skiing on golden eagles in the Wasatch Mountains, Utah
Teryl G. Grubb; David K. Delaney; William W. Bowerman
2007-01-01
Implementing further research was beyond the scope of the U.S. Forest Service's 2004 Final Environmental Impact Statement (FEIS) and 2005 Wasatch Powderbird Guides (WPG) Special Use Permit Renewal process for heli-skiing in the Tri-Canyon Area in the Wasatch Mountains, just east of Salt Lake City, Utah. However, in their Record of Decision the Wasaatch-Cache (WCNF...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-07
... Federal Register on July 31, 2009 (Volume 74, No. 146, Page 38260) and an amended NOI was published on April 13, 2010 (Volume 75, No. 70, Page 18941) changing the limits of the project. FOR FURTHER... corridor have led to a decision to significantly change the design concept and scope of the proposed...
75 FR 44044 - Environmental Impact Statements: National Summary of Rescinded Notices of Intent
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-27
... rescoped and now meets the criteria for an EA. In Minnesota, the Tier 1 EIS 33rd Street Corridor between TH 15 and TH 10 in Sherburne and Stearns Counties has been reduced in scope and now meets the criteria.... Mary's Counties. MN Tier I EIS--33rd Street 12/26/2002 1/7/2010 Corridor between TH 15 and TH 10...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-18
... Mining Reclamation and Enforcement (OSM), Western Region (WR), Denver, Colorado, intends to prepare an... Hotevilla Village. Cortez, Colorado, on Friday, August 10, 2012, from 5:00 p.m. to 9:00 p.m. at the... High School. Durango, Colorado, on Thursday, August 16, 2012, from 4:00 p.m. to 8:00 p.m. at the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-18
... Wildlife Coordination Act (Pub. L. 85-624), section 601(a) of the Water Resources Development Act (WRDA) of...(a) of the Water Resources Development Act (WRDA) of 1986, and section 334(a) and (b) of the WRDA of... Recovery Management Plan with integrated EIS will be narrower than the scope and purpose of the study from...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-10
... corrects the date of one of the public scoping meetings listed in the Notice of Intent published in the... Thursday, December 13, 2012, from 4:00 p.m. to 7:00 p.m. FOR FURTHER INFORMATION CONTACT: Mr. Randel Perry... Officer. [FR Doc. 2012-29692 Filed 12-7-12; 8:45 am] BILLING CODE 3720-58-P ...
Columbia River System Operation Review : Final Environmental Impact Statement, Appendix N: Wildlife.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Columbia River System Operation Review
1995-11-01
The Columbia River System is a vast and complex combination of Federal and non-Federal facilities used for many purposes including power production, irrigation, navigation, flood control, recreation, fish and wildlife habitat and municipal and industrial water supply. Each river use competes for the limited water resources in the Columbia River Basin. This technical appendix addresses only the effects of alternative system operating strategies for managing the Columbia River system. The environmental impact statement (EIS) itself and some of the other appendices present analyses of the alternative approaches to the other three decisions considered as part of the SOR. This documentmore » is the product of the Wildlife Work Group, focusing on wildlife impacts but not including fishes. Topics covered include the following: scope and process; existing and affected environment, including specific discussion of 18 projects in the Columbia river basin. Analysis, evaluation, and alternatives are presented for all projects. System wide impacts to wildlife are also included.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-28
... Road 56 in King County, Washington northeast of the city of North Bend. The NOI was published in the Federal Register on April 27, 2001. This rescission is based on a reduction in the scope of the project... rescinding the NOI to prepare an EIS for a project that had been proposed to improve Forest Road 56, Middle...
X-33 Environmental Impact Statement: A Fast Track Approach
NASA Technical Reports Server (NTRS)
McCaleb, Rebecca C.; Holland, Donna L.
1998-01-01
NASA is required by the National Environmental Policy Act (NEPA) to prepare an appropriate level environmental analysis for its major projects. Development of the X-33 Technology Demonstrator and its associated flight test program required an environmental impact statement (EIS) under the NEPA. The EIS process is consists of four parts: the "Notice of Intent" to prepare an EIS and scoping; the draft EIS which is distributed for review and comment; the final ETS; and the "Record of Decision." Completion of this process normally takes from 2 - 3 years, depending on the complexity of the proposed action. Many of the agency's newest fast track, technology demonstration programs require NEPA documentation, but cannot sustain the lengthy time requirement between program concept development to implementation. Marshall Space Flight Center, in cooperation with Kennedy Space Center, accomplished the NEPA process for the X-33 Program in 13 months from Notice of Intent to Record of Decision. In addition, the environmental team implemented an extensive public involvement process, conducting a total of 23 public meetings for scoping and draft EIS comment along with numerous informal meetings with public officials, civic organizations, and Native American Indians. This paper will discuss the fast track approach used to successfully accomplish the NEPA process for X-33 on time.
2011-05-01
There are several different methods available for determining stormwater runoff peak flows. Two of the most widely used methods are the Rational...environmental factors between the alternatives differ in terms of their respective potential for adverse effects relative to their location. ENVIRONMENTAL...Force selects a development proposal. As a result, the actual project scope may result in different numbers of units constructed or demolished, or
Gray, Mikel; Kent, Dea; Ermer-Seltun, JoAnn; McNichol, Laurie
The Wound, Ostomy and Continence Nurses (WOCN) Society charged a task force with creating recommendations for assessment, selection, use, and evaluation of body-worn absorbent products. The 3-member task force, assisted by a moderator with knowledge of this area of care, completed a scoping literature review to identify recommendations supported by adequate research to qualify as evidence-based, and area of care where evidence needed to guide care was missing. Based on findings of this scoping review, the Society then convened a panel of experts to develop consensus statements guiding assessment, use, and evaluation of the effect of body-worn absorbent products for adults with urinary and/or fecal incontinence. These consensus-based statements underwent a second round of content validation using a modified Delphi technique using a different panel of clinicians with expertise in this area of care. This article reports on the scoping review and subsequent evidence-based statements, along with generation and validation of consensus-based statements that will be used to create an algorithm to aid clinical decision making.
21 CFR 209.1 - Scope and purpose.
Code of Federal Regulations, 2011 CFR
2011-04-01
... REQUIREMENT FOR AUTHORIZED DISPENSERS AND PHARMACIES TO DISTRIBUTE A SIDE EFFECTS STATEMENT General Provisions... dispensers and pharmacies to consumers. This part requires distribution of a side effects statement and...
21 CFR 209.1 - Scope and purpose.
Code of Federal Regulations, 2010 CFR
2010-04-01
... REQUIREMENT FOR AUTHORIZED DISPENSERS AND PHARMACIES TO DISTRIBUTE A SIDE EFFECTS STATEMENT General Provisions... dispensers and pharmacies to consumers. This part requires distribution of a side effects statement and...
21 CFR 209.1 - Scope and purpose.
Code of Federal Regulations, 2012 CFR
2012-04-01
... REQUIREMENT FOR AUTHORIZED DISPENSERS AND PHARMACIES TO DISTRIBUTE A SIDE EFFECTS STATEMENT General Provisions... dispensers and pharmacies to consumers. This part requires distribution of a side effects statement and...
21 CFR 209.1 - Scope and purpose.
Code of Federal Regulations, 2014 CFR
2014-04-01
... REQUIREMENT FOR AUTHORIZED DISPENSERS AND PHARMACIES TO DISTRIBUTE A SIDE EFFECTS STATEMENT General Provisions... dispensers and pharmacies to consumers. This part requires distribution of a side effects statement and...
21 CFR 209.1 - Scope and purpose.
Code of Federal Regulations, 2013 CFR
2013-04-01
... REQUIREMENT FOR AUTHORIZED DISPENSERS AND PHARMACIES TO DISTRIBUTE A SIDE EFFECTS STATEMENT General Provisions... dispensers and pharmacies to consumers. This part requires distribution of a side effects statement and...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Terry, J.W.; Blasing, T.J.; Ensminger, J.T.
Under the Chemical Stockpile Disposal Program (CSDP), the US Army proposes to dispose of lethal chemical agents and munitions stored at eight existing Army installations in the continental United States. In 1988, the US Army issued the final programmatic environmental impact statement (FPEIS) for the CSDP. The FPEIS and the subsequent Record of Decision (ROD) identified an on-site disposal process as the preferred method for destruction of the stockpile. That is, the FPEIS determined the environmentally preferred alternative to be on-site disposal in high-temperature incinerators, while the ROD selected this alternative for implementation as the preferred method for destruction ofmore » the stockpile. In this Phase I report, the overall CSDP decision regarding disposal of the PUDA Stockpile is subjected to further analyses, and its validity at PUDA is reviewed with newer, more detailed data than those providing the basis for the conclusions in the FPEIS. The findings of this Phase I report will be factored into the scope of a site-specific environmental impact statement to be prepared for the destruction of the PUDA stockpile. The focus of this Phase I report is on those data identified as having the potential to alter the Army`s previous decision regarding disposal of the PUDA stockpile; however, several other factors beyond the scope of this Phase I report must also be acknowledged to have the potential to change or modify the Army`s decisions regarding PUDA.« less
Vocational Home Economics Education. Coalition Statement. Second Edition.
ERIC Educational Resources Information Center
Home Economics Education Association, Gainesville, VA.
This pamphlet contains the statement of the Coalition of the American Home Economics Association, American Vocational Association, and Home Economics Education Association regarding the scope and definition of vocational home economics education. It is intended to serve as a basis for professional action. Sections of this statement address the…
2012-01-01
Heat island” refers to built up areas that have hotter surface and air temperatures than nearby rural areas. Heat island effect occurs when...Summary of Environmental Effects The public and regulatory agency scoping process focused the analysis on the following environmental resources... effects of implementing the DLIELC and IAAFA ADP are not significant, that preparation of an Environmental Impact Statement is unnecessary, and that a
Internationalization of the Counseling Profession: Meaning, Scope and Concerns
ERIC Educational Resources Information Center
Ng, Kok-Mun; Noonan, Brigid M.
2012-01-01
The present study sought to clarify the meaning and delineate the scope of internationalization of the counseling profession. Using a qualitative approach, the study recruited a panel of eight experts to help generate a consensus statement on the meaning of internationalization to the counseling profession and to delineate a five-theme scope of…
12 CFR 363.1 - Scope and definitions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... accepted accounting principles for the insured depository institution or its holding company and financial statements prepared for regulatory reporting purposes. For recognition and measurement purposes, financial statements prepared for regulatory reporting purposes shall conform to generally accepted accounting...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-16
...'s statements of account shall set forth each step of its calculations with sufficient information to... available by persons making digital phonorecord deliveries.'' Register's Division of Authority Decision... type of information in a notice of use (but not in the statement of account) to be served on the...
10 CFR 33.15 - Requirements for the issuance of a Type C specific license of broad scope.
Code of Federal Regulations, 2010 CFR
2010-01-01
... OF BROAD SCOPE FOR BYPRODUCT MATERIAL Specific Licenses of Broad Scope § 33.15 Requirements for the... this chapter; and (b) The applicant submits a statement that byproduct material will be used only by... bachelor level, or equivalent training and experience, in the physical or biological sciences or in...
38 CFR 41.500 - Scope of audit.
Code of Federal Regulations, 2010 CFR
2010-07-01
... OF STATES, LOCAL GOVERNMENTS, AND NON-PROFIT ORGANIZATIONS Auditors § 41.500 Scope of audit. (a... auditor shall determine whether the financial statements of the auditee are presented fairly in all material respects in conformity with generally accepted accounting principles. The auditor shall also...
38 CFR 41.500 - Scope of audit.
Code of Federal Regulations, 2011 CFR
2011-07-01
... OF STATES, LOCAL GOVERNMENTS, AND NON-PROFIT ORGANIZATIONS Auditors § 41.500 Scope of audit. (a... auditor shall determine whether the financial statements of the auditee are presented fairly in all material respects in conformity with generally accepted accounting principles. The auditor shall also...
Code of Federal Regulations, 2014 CFR
2014-01-01
... “conciseness” of the statement, taking into account the scope of the disagreement and the complexity of the... disagreement, the appropriate system manager will clearly note any disputed portion(s) of the record(s) and...
Code of Federal Regulations, 2012 CFR
2012-01-01
... “conciseness” of the statement, taking into account the scope of the disagreement and the complexity of the... disagreement, the appropriate system manager will clearly note any disputed portion(s) of the record(s) and...
A Different Kind of Web-Based Knowledge Management: The DTRA Acquisition ToolBook
2008-12-01
Reimbursement Order MIPR: Military Interdepartmental Purchase Request PWS: Performance Work Statement SOO: Statement of Objectives SOW: Scope of Work Figure 1...Competitive BAA: Broad Agency Announcement IACRO: Inter-Agency Cost Reimbur ement Order MIPR: Military Interdepartmental Purchas Request PWS
A scoping review of competencies for scientific editors of biomedical journals.
Galipeau, James; Barbour, Virginia; Baskin, Patricia; Bell-Syer, Sally; Cobey, Kelly; Cumpston, Miranda; Deeks, Jon; Garner, Paul; MacLehose, Harriet; Shamseer, Larissa; Straus, Sharon; Tugwell, Peter; Wager, Elizabeth; Winker, Margaret; Moher, David
2016-02-02
Biomedical journals are the main route for disseminating the results of health-related research. Despite this, their editors operate largely without formal training or certification. To our knowledge, no body of literature systematically identifying core competencies for scientific editors of biomedical journals exists. Therefore, we aimed to conduct a scoping review to determine what is known on the competency requirements for scientific editors of biomedical journals. We searched the MEDLINE®, Cochrane Library, Embase®, CINAHL, PsycINFO, and ERIC databases (from inception to November 2014) and conducted a grey literature search for research and non-research articles with competency-related statements (i.e. competencies, knowledge, skills, behaviors, and tasks) pertaining to the role of scientific editors of peer-reviewed health-related journals. We also conducted an environmental scan, searched the results of a previous environmental scan, and searched the websites of existing networks, major biomedical journal publishers, and organizations that offer resources for editors. A total of 225 full-text publications were included, 25 of which were research articles. We extracted a total of 1,566 statements possibly related to core competencies for scientific editors of biomedical journals from these publications. We then collated overlapping or duplicate statements which produced a list of 203 unique statements. Finally, we grouped these statements into seven emergent themes: (1) dealing with authors, (2) dealing with peer reviewers, (3) journal publishing, (4) journal promotion, (5) editing, (6) ethics and integrity, and (7) qualities and characteristics of editors. To our knowledge, this scoping review is the first attempt to systematically identify possible competencies of editors. Limitations are that (1) we may not have captured all aspects of a biomedical editor's work in our searches, (2) removing redundant and overlapping items may have led to the elimination of some nuances between items, (3) restricting to certain databases, and only French and English publications, may have excluded relevant publications, and (4) some statements may not necessarily be competencies. This scoping review is the first step of a program to develop a minimum set of core competencies for scientific editors of biomedical journals which will be followed by a training needs assessment, a Delphi exercise, and a consensus meeting.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Scope. 370.1 Section 370.1 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION REGULATIONS AND STATEMENTS OF GENERAL POLICY TEMPORARY LIQUIDITY..., requirements, and other provisions related to participation in the FDIC's temporary liquidity guarantee program. ...
Health Impact Assessment, Physical Activity and Federal Lands Trail Policy
Davis, Sally M.; Cruz, Theresa H.; Kozoll, Richard L.
2016-01-01
Objectives The objectives of this paper are to describe the application of Health Impact Assessment (HIA) to inform trail decisions affecting a rural, under-resourced community and propose the routine integration of HIAs to enhance NEPA environmental assessments and environmental impact statements for trail decisions on federal lands. Methods Screening, scoping, assessment, recommendations, reporting, monitoring and evaluation are being used to examine the health impact of trail location and design. Results HIA recommendations are being integrated into the public lands National Environmental Protection Act process for planning access to a new segment of the Continental Divide National Scenic Trail. Potential users from a nearby rural New Mexico community and a region of almost one million may benefit from this HIA-informed planning. Conclusions HIA can be integrated into the policy and decision-making process for trails on public lands. PMID:27213163
ERIC Educational Resources Information Center
Molina, John C.; Ridge, Elton W.
This document consists of two statements, one made by John Molina, Director of the Office of Bilingual Education, and the other by Elton W. Ridge, Project Manager of the Lau-Bilingual programs. The statement by Molina discusses the scope and the goals of ESEA Title VII programs and what has been accomplished. Statistics are presented on the number…
Code of Federal Regulations, 2010 CFR
2010-01-01
... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Scope. 328.0 Section 328.0 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION REGULATIONS AND STATEMENTS OF GENERAL POLICY ADVERTISEMENT OF... institutions must include in their advertisements. For purposes of part 328, the term “insured depository...
41 CFR 105-60.000 - Scope of part.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Scope of part. 105-60.000 Section 105-60.000 Public Contracts and Property Management Federal Property Management... policy statements and staff manuals; (3) Operational and other appropriate agency records; and (4) Agency...
Bridging the Gap with the Pacific Climate Impacts Consortium (PCIC)
NASA Astrophysics Data System (ADS)
Rodenhuis, D.; Kangasniemi, B.; Murdock, T. Q.
2008-12-01
The difficulty of translating scientific results into useful information defines the abyss that is addressed by a new PCIC consortium of academics-government-industry at the University of Victoria. The scope of the consortium is research applications of climate variability and change, including extreme weather events, for climate impacts and adaptation in Pacific North America. During the past 3 years traditional tools of collaboration have been utilized--both with the science community and with stakeholders. Some success in networking with Provinces, the States, and with national institutions has been achieved. Limitations of governance/management, resources, and cooperation have been identified. Input and statements of need from the climate stakeholders in government and industry has been achieved, but only in specific areas - water/power generation, forestry, communities. Three examples will be given of successful engagement of stakeholders. These examples demonstrate how difficult it is to summarize effectiveness, relevance, and capacity. This experience, and early decisions on scope, focus and priorities have taken us this far, but some exceptional challenges have arisen due to the stakeholder demand for new (geophysical) design conditions for the 21st century.
40 CFR 156.200 - Scope and applicability.
Code of Federal Regulations, 2010 CFR
2010-07-01
... this chapter. These statements refer to specific workplace practices designed to reduce or eliminate... 170 of this chapter. The requirements addressed in these statements are designed to reduce the risk of... shall be distributed or sold without amended labeling by any registrant after April 21, 1994, or by any...
29 CFR 780.128 - General statement on “secondary” agriculture.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 29 Labor 3 2014-07-01 2014-07-01 false General statement on âsecondaryâ agriculture. 780.128... APPLICABLE TO AGRICULTURE, PROCESSING OF AGRICULTURAL COMMODITIES, AND RELATED SUBJECTS UNDER THE FAIR LABOR STANDARDS ACT General Scope of Agriculture Practices Exempt Under âsecondaryâ Meaning of Agriculture...
29 CFR 780.128 - General statement on “secondary” agriculture.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 29 Labor 3 2011-07-01 2011-07-01 false General statement on âsecondaryâ agriculture. 780.128... APPLICABLE TO AGRICULTURE, PROCESSING OF AGRICULTURAL COMMODITIES, AND RELATED SUBJECTS UNDER THE FAIR LABOR STANDARDS ACT General Scope of Agriculture Practices Exempt Under âsecondaryâ Meaning of Agriculture...
29 CFR 780.128 - General statement on “secondary” agriculture.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 29 Labor 3 2013-07-01 2013-07-01 false General statement on âsecondaryâ agriculture. 780.128... APPLICABLE TO AGRICULTURE, PROCESSING OF AGRICULTURAL COMMODITIES, AND RELATED SUBJECTS UNDER THE FAIR LABOR STANDARDS ACT General Scope of Agriculture Practices Exempt Under âsecondaryâ Meaning of Agriculture...
29 CFR 780.128 - General statement on “secondary” agriculture.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 3 2010-07-01 2010-07-01 false General statement on âsecondaryâ agriculture. 780.128... APPLICABLE TO AGRICULTURE, PROCESSING OF AGRICULTURAL COMMODITIES, AND RELATED SUBJECTS UNDER THE FAIR LABOR STANDARDS ACT General Scope of Agriculture Practices Exempt Under âsecondaryâ Meaning of Agriculture...
29 CFR 780.128 - General statement on “secondary” agriculture.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 29 Labor 3 2012-07-01 2012-07-01 false General statement on âsecondaryâ agriculture. 780.128... APPLICABLE TO AGRICULTURE, PROCESSING OF AGRICULTURAL COMMODITIES, AND RELATED SUBJECTS UNDER THE FAIR LABOR STANDARDS ACT General Scope of Agriculture Practices Exempt Under âsecondaryâ Meaning of Agriculture...
16 CFR 307.2 - Required warnings.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Required warnings. 307.2 Section 307.2... THE COMPREHENSIVE SMOKELESS TOBACCO HEALTH EDUCATION ACT OF 1986 Scope § 307.2 Required warnings. The... regulations. Section 7 of this law provides that no statement, other than the three warning statements...
77 FR 62269 - Draft Tribal Protocol Manual and Scoping for Proposed Policy Statement
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-12
.... The NRC is committed to an open and collaborative regulatory environment in the development of its... NRC also seeks suggestions on the development of the proposed tribal consultation policy statement... uranium recovery development and new nuclear reactor construction has resulted in a significant increase...
2017-01-01
ABSTRACT Dysbiosis is a key term in human microbiome research, especially when microbiome patterns are associated with disease states. Although some questions have been raised about how this term is applied, its use continues undiminished in the literature. We investigate the ways in which microbiome researchers discuss dysbiosis and then assess the impact of different concepts of dysbiosis on microbiome research. After an overview of the term’s historical roots, we conduct quantitative and qualitative analyses of a large selection of contemporary dysbiosis statements. We categorize both short definitions and longer conceptual statements about dysbiosis. Further analysis allows us to identify the problematic implications of how dysbiosis is used, particularly with regard to causal hypotheses and normal-abnormal distinctions. We suggest that researchers should reflect carefully on the ways in which they discuss dysbiosis, in order for the field to continue to develop greater predictive scope and explanatory depth. PMID:29018121
12 CFR 390.53 - Scope of document discovery.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 12 Banks and Banking 5 2014-01-01 2014-01-01 false Scope of document discovery. 390.53 Section 390.53 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION REGULATIONS AND STATEMENTS OF GENERAL... deliberative-process privilege, and any other privileges the Constitution, any applicable act of Congress, or...
32 CFR 37.1010 - What substantive issues should my award document address?
Code of Federal Regulations, 2011 CFR
2011-07-01
... document must address: (a) Project scope. The scope is an overall vision statement for the project... must set forth the minimum required Federal Government rights in intellectual property generated under... tangible property. Your property provisions for for-profit and nonprofit participants must be in accordance...
12 CFR 353.1 - Purpose and scope.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Purpose and scope. 353.1 Section 353.1 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION REGULATIONS AND STATEMENTS OF GENERAL POLICY... state nonmember bank files a Suspicious Activity Report when it detects a known or suspected criminal...
The High/Scope Preschool Key Experiences: Essential Elements of Young Children's Learning.
ERIC Educational Resources Information Center
Hohmann, Mary
2002-01-01
Discusses High/Scope's preschool key experiences (a set of 58 statements that describe young children's social, cognitive, and physical development). The key experiences are grouped into 10 major developmental areas (creative representation, language and literacy, social relations, movement, music, classification, seriation, number, space, and…
Code of Federal Regulations, 2012 CFR
2012-04-01
... seeking the issuance of general statements of policy or guidance under 22 U.S.C. 4107(c)(2)(F). ... 22 Foreign Relations 2 2012-04-01 2009-04-01 true Scope. 1427.1 Section 1427.1 Foreign Relations FOREIGN SERVICE LABOR RELATIONS BOARD; FEDERAL LABOR RELATIONS AUTHORITY; GENERAL COUNSEL OF THE FEDERAL...
Code of Federal Regulations, 2011 CFR
2011-04-01
... seeking the issuance of general statements of policy or guidance under 22 U.S.C. 4107(c)(2)(F). ... 22 Foreign Relations 2 2011-04-01 2009-04-01 true Scope. 1427.1 Section 1427.1 Foreign Relations FOREIGN SERVICE LABOR RELATIONS BOARD; FEDERAL LABOR RELATIONS AUTHORITY; GENERAL COUNSEL OF THE FEDERAL...
Code of Federal Regulations, 2010 CFR
2010-04-01
... seeking the issuance of general statements of policy or guidance under 22 U.S.C. 4107(c)(2)(F). ... 22 Foreign Relations 2 2010-04-01 2010-04-01 true Scope. 1427.1 Section 1427.1 Foreign Relations FOREIGN SERVICE LABOR RELATIONS BOARD; FEDERAL LABOR RELATIONS AUTHORITY; GENERAL COUNSEL OF THE FEDERAL...
Code of Federal Regulations, 2014 CFR
2014-04-01
... seeking the issuance of general statements of policy or guidance under 22 U.S.C. 4107(c)(2)(F). ... 22 Foreign Relations 2 2014-04-01 2014-04-01 false Scope. 1427.1 Section 1427.1 Foreign Relations FOREIGN SERVICE LABOR RELATIONS BOARD; FEDERAL LABOR RELATIONS AUTHORITY; GENERAL COUNSEL OF THE FEDERAL...
Code of Federal Regulations, 2013 CFR
2013-04-01
... seeking the issuance of general statements of policy or guidance under 22 U.S.C. 4107(c)(2)(F). ... 22 Foreign Relations 2 2013-04-01 2009-04-01 true Scope. 1427.1 Section 1427.1 Foreign Relations FOREIGN SERVICE LABOR RELATIONS BOARD; FEDERAL LABOR RELATIONS AUTHORITY; GENERAL COUNSEL OF THE FEDERAL...
29 CFR 451.1 - Introductory statement.
Code of Federal Regulations, 2010 CFR
2010-07-01
... provisions of the Act with “a practical guide * * * as to how the office representing the public interest in....1 Introductory statement. (a) This part discusses the meaning and scope of sections 3(i) and 3(j) of..., nor to section 505 of title V, which amends section 302 (a), (b), and (c) of the Labor Management...
29 CFR 2580.412-33 - Introductory statement.
Code of Federal Regulations, 2010 CFR
2010-07-01
... company or through any agent or broker in whose business operations such plan or any party in interest in... BONDING RULES Prohibition Against Bonding by Parties Interested in the Plan § 2580.412-33 Introductory statement. (a) This part discusses the meaning and scope of section 13(c) of the Welfare and Pension Plans...
Emergency medicine in the developing world: a Delphi study.
Hodkinson, Peter W; Wallis, Lee A
2010-07-01
Emergency medicine (EM) as a specialty has developed rapidly in the western world, but remains largely immature in developing nations. There is an urgent need for emergency services, but no clear guidelines are available on the priorities for establishing EM in the developing world. This study seeks to establish consensus on key areas of EM development in developing world settings, with respect to scope of EM, staffing needs, training requirements, and research priorities. A three-round Delphi study was conducted via e-mail. A panel was convened of 50 EM specialists or equivalent, with experience in or interest in EM in the developing world. In the first round, panelists provided free-text statements on scope, staffing, training, and research priorities for EM in the developing world. A five-point Likert scale was used to rate agreement with the statements in Rounds 2 and 3. Consensus statements are presented as a series of synopsis statements for each of the four major themes. A total of 168 of 208 statements (81%) had reached consensus at the end of the study. Key areas in which consensus was reached included EM being a specialist-driven service, with substantial role for nonphysicians. International training courses should be adapted to local needs. EM research in developing countries should be clinically driven and focus on local issues of importance. The scope and function of EM and relationships with other specialties are defined. Unambiguous principles are laid out for the development of the specialty in developing world environments. The next step required in this process is translation into practical guidelines for the development of EM in developing world settings where they may be used to drive policy, protocols, and research. 2010 by the Society for Academic Emergency Medicine
Code of Federal Regulations, 2010 CFR
2010-01-01
... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Authority, purpose, scope, other supervisory authority, and disclosure of capital categories. 325.101 Section 325.101 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION REGULATIONS AND STATEMENTS OF GENERAL POLICY CAPITAL MAINTENANCE Prompt Corrective...
12 CFR 336.10 - Purpose and scope.
Code of Federal Regulations, 2010 CFR
2010-01-01
... restrictions set forth in section 10(k) of the Federal Deposit Insurance Act, 12 U.S.C. 1820(k), and implements... 12 Banks and Banking 4 2010-01-01 2010-01-01 false Purpose and scope. 336.10 Section 336.10 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION REGULATIONS AND STATEMENTS OF GENERAL POLICY FDIC...
12 CFR 336.10 - Purpose and scope.
Code of Federal Regulations, 2013 CFR
2013-01-01
... restrictions set forth in section 10(k) of the Federal Deposit Insurance Act, 12 U.S.C. 1820(k), and implements... 12 Banks and Banking 5 2013-01-01 2013-01-01 false Purpose and scope. 336.10 Section 336.10 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION REGULATIONS AND STATEMENTS OF GENERAL POLICY FDIC...
12 CFR 336.10 - Purpose and scope.
Code of Federal Regulations, 2011 CFR
2011-01-01
... restrictions set forth in section 10(k) of the Federal Deposit Insurance Act, 12 U.S.C. 1820(k), and implements... 12 Banks and Banking 4 2011-01-01 2011-01-01 false Purpose and scope. 336.10 Section 336.10 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION REGULATIONS AND STATEMENTS OF GENERAL POLICY FDIC...
12 CFR 336.10 - Purpose and scope.
Code of Federal Regulations, 2014 CFR
2014-01-01
... restrictions set forth in section 10(k) of the Federal Deposit Insurance Act, 12 U.S.C. 1820(k), and implements... 12 Banks and Banking 5 2014-01-01 2014-01-01 false Purpose and scope. 336.10 Section 336.10 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION REGULATIONS AND STATEMENTS OF GENERAL POLICY FDIC...
12 CFR 336.10 - Purpose and scope.
Code of Federal Regulations, 2012 CFR
2012-01-01
... restrictions set forth in section 10(k) of the Federal Deposit Insurance Act, 12 U.S.C. 1820(k), and implements... 12 Banks and Banking 5 2012-01-01 2012-01-01 false Purpose and scope. 336.10 Section 336.10 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION REGULATIONS AND STATEMENTS OF GENERAL POLICY FDIC...
29 CFR 776.0a - Introductory statement.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Employee Coverage § 776.0a Introductory statement. (a) Scope and significance of this part. (1) The Fair... goods for commerce.” 2 What employees are so engaged must be ascertained in the light of the definitions... Reorganization Plan No. 2 (60 Stat. 1095), effective July 16, 1946; by the Portal-to-Portal Act of 1947, approved...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-02
... Industries (``Perfect Fit''), a U.S. importer of knitted electric blankets, submitted comments on the scope... investigation to include the following two statements: (1) ``knitted electric blankets in any form, whether... acknowledged that knitted electric blankets and electric mattress pads are not within the scope of the U.S...
23 CFR Appendix A to Part 450 - Linking the Transportation Planning and NEPA Processes
Code of Federal Regulations, 2013 CFR
2013-04-01
... and refined, and how the design concept and scope were determined) should play a critical role in...., congestion, pavement, bridge, and/or safety) may shape the purpose and need statement. The use of these..., selection of the design concept and scope for a project or series of projects. Subsequently, second-tier...
23 CFR Appendix A to Part 450 - Linking the Transportation Planning and NEPA Processes
Code of Federal Regulations, 2011 CFR
2011-04-01
... and refined, and how the design concept and scope were determined) should play a critical role in...., congestion, pavement, bridge, and/or safety) may shape the purpose and need statement. The use of these..., selection of the design concept and scope for a project or series of projects. Subsequently, second-tier...
23 CFR Appendix A to Part 450 - Linking the Transportation Planning and NEPA Processes
Code of Federal Regulations, 2014 CFR
2014-04-01
... and refined, and how the design concept and scope were determined) should play a critical role in...., congestion, pavement, bridge, and/or safety) may shape the purpose and need statement. The use of these..., selection of the design concept and scope for a project or series of projects. Subsequently, second-tier...
23 CFR Appendix A to Part 450 - Linking the Transportation Planning and NEPA Processes
Code of Federal Regulations, 2010 CFR
2010-04-01
... and refined, and how the design concept and scope were determined) should play a critical role in...., congestion, pavement, bridge, and/or safety) may shape the purpose and need statement. The use of these..., selection of the design concept and scope for a project or series of projects. Subsequently, second-tier...
23 CFR Appendix A to Part 450 - Linking the Transportation Planning and NEPA Processes
Code of Federal Regulations, 2012 CFR
2012-04-01
... and refined, and how the design concept and scope were determined) should play a critical role in...., congestion, pavement, bridge, and/or safety) may shape the purpose and need statement. The use of these..., selection of the design concept and scope for a project or series of projects. Subsequently, second-tier...
Code of Federal Regulations, 2010 CFR
2010-01-01
... Responsibilities and Policy Statement on Implementation of Section 511 of the Federal Water Pollution Control Act... National Environmental Policy Act-Regulations Implementing Section 102(2) § 51.10 Purpose and scope of... Policy Act of 1969, as amended (NEPA) directs that, to the fullest extent possible: (1) The policies...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-23
... DEPARTMENT OF DEFENSE Department of the Navy Notice of Intent To Prepare an Environmental Impact Statement/ Overseas Environmental Impact Statement for Military Readiness Activities in the Northwest... development of an Environmental Impact Statement/Overseas Environmental Impact Statement for the Northwest...
46 CFR 504.7 - Environmental impact statements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 9 2010-10-01 2010-10-01 false Environmental impact statements. 504.7 Section 504.7... POLICY ANALYSIS § 504.7 Environmental impact statements. (a) General. (1) An environmental impact... environmental impact statements. (1) A draft environmental impact statement (DEIS) will initially be prepared in...
10 CFR 51.86 - Distribution of draft environmental impact statement.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Rulemaking § 51.86 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and any...
10 CFR 51.86 - Distribution of draft environmental impact statement.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Rulemaking § 51.86 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and any...
10 CFR 51.81 - Distribution of draft environmental impact statement.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.81 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and...
10 CFR 51.81 - Distribution of draft environmental impact statement.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.81 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and...
10 CFR 51.81 - Distribution of draft environmental impact statement.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.81 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and...
10 CFR 51.81 - Distribution of draft environmental impact statement.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.81 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and...
10 CFR 51.86 - Distribution of draft environmental impact statement.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Rulemaking § 51.86 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and any...
10 CFR 51.86 - Distribution of draft environmental impact statement.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Rulemaking § 51.86 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and any...
10 CFR 51.86 - Distribution of draft environmental impact statement.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Rulemaking § 51.86 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and any...
10 CFR 51.81 - Distribution of draft environmental impact statement.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.81 Distribution of draft environmental impact statement. Copies of the draft environmental impact statement and...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Environmental impact statement content... Impact Statements § 46.415 Environmental impact statement content, alternatives, circulation and filing requirements. The Responsible Official may use any environmental impact statement format and design as long as...
Code of Federal Regulations, 2011 CFR
2011-10-01
... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Environmental impact statement content... Impact Statements § 46.415 Environmental impact statement content, alternatives, circulation and filing requirements. The Responsible Official may use any environmental impact statement format and design as long as...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-07
... Final Environmental Impact Statement/Overseas Environmental Impact Statement for Gulf of Mexico Range... set forth in Alternative 2, described in the Final Environmental Impact Statement (EIS)/Overseas Environmental Impact Statement (OEIS) as the Preferred Alternative. The purpose for the proposed action is to...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-26
... Impact Statement/ Environmental Impact Statement, Upper Truckee River and Marsh Restoration Project, El... Statement (EIR/EIS/EIS) for the Upper Truckee River Restoration and Marsh Restoration Project (Project). The... prepare email comments for the Project. The public hearings will be held at 128 Market Street, Stateline...
24 CFR 58.60 - Preparation and filing of environmental impact statements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... environmental impact statements. 58.60 Section 58.60 Housing and Urban Development Office of the Secretary... Environmental Impact Statements § 58.60 Preparation and filing of environmental impact statements. (a) The responsible entity must prepare the draft environmental impact statement (DEIS) and the final environmental...
ERIC Educational Resources Information Center
Parmenter, Carol L. W.
The purpose of this study was to determine the nature and scope of equine education programs being offered in the colleges and universities throughout the country and the attitudes of specialists toward these programs. The paper is organized into five major categories: (1) introduction, statement of purpose, design and scope of the study, and…
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Distribution of draft environmental impact statement and supplement to draft environmental impact statement; news releases. 51.74 Section 51.74 Energy NUCLEAR... environmental impact statement; news releases. (a) A copy of the draft environmental impact statement will be...
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Distribution of draft environmental impact statement and supplement to draft environmental impact statement; news releases. 51.74 Section 51.74 Energy NUCLEAR... environmental impact statement; news releases. (a) A copy of the draft environmental impact statement will be...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Distribution of draft environmental impact statement and supplement to draft environmental impact statement; news releases. 51.74 Section 51.74 Energy NUCLEAR... environmental impact statement; news releases. (a) A copy of the draft environmental impact statement will be...
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Distribution of draft environmental impact statement and supplement to draft environmental impact statement; news releases. 51.74 Section 51.74 Energy NUCLEAR... environmental impact statement; news releases. (a) A copy of the draft environmental impact statement will be...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Distribution of draft environmental impact statement and supplement to draft environmental impact statement; news releases. 51.74 Section 51.74 Energy NUCLEAR... environmental impact statement; news releases. (a) A copy of the draft environmental impact statement will be...
10 CFR 51.72 - Supplement to draft environmental impact statement.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Supplement to draft environmental impact statement. 51.72... Implementing Section 102(2) Environmental Impact Statements § 51.72 Supplement to draft environmental impact statement. (a) The NRC staff will prepare a supplement to a draft environmental impact statement for which a...
10 CFR 51.72 - Supplement to draft environmental impact statement.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Supplement to draft environmental impact statement. 51.72... Implementing Section 102(2) Environmental Impact Statements § 51.72 Supplement to draft environmental impact statement. (a) The NRC staff will prepare a supplement to a draft environmental impact statement for which a...
10 CFR 51.72 - Supplement to draft environmental impact statement.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Supplement to draft environmental impact statement. 51.72... Implementing Section 102(2) Environmental Impact Statements § 51.72 Supplement to draft environmental impact statement. (a) The NRC staff will prepare a supplement to a draft environmental impact statement for which a...
10 CFR 51.72 - Supplement to draft environmental impact statement.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Supplement to draft environmental impact statement. 51.72... Implementing Section 102(2) Environmental Impact Statements § 51.72 Supplement to draft environmental impact statement. (a) The NRC staff will prepare a supplement to a draft environmental impact statement for which a...
10 CFR 51.72 - Supplement to draft environmental impact statement.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Supplement to draft environmental impact statement. 51.72... Implementing Section 102(2) Environmental Impact Statements § 51.72 Supplement to draft environmental impact statement. (a) The NRC staff will prepare a supplement to a draft environmental impact statement for which a...
43 CFR 3425.1-7 - Preliminary data.
Code of Federal Regulations, 2011 CFR
2011-10-01
... facilities. (2) A narrative statement, including: (i) The anticipated scope, method, and schedule of... to the lands applied for; known geologic, visual, cultural, paleontological or archaeological...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-27
... Statement/Overseas Environmental Impact Statement for Hawaii-Southern California Training and Testing AGENCY... Final Environmental Impact Statement (EIS)/Overseas EIS (OEIS) for Hawaii- Southern California Training.... Navy Training and Testing Activities in the Hawaii- Southern California Training and Testing Study Area...
32 CFR 651.23 - Environmental impact statement.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 4 2010-07-01 2010-07-01 true Environmental impact statement. 651.23 Section...) ENVIRONMENTAL QUALITY ENVIRONMENTAL ANALYSIS OF ARMY ACTIONS (AR 200-2) Records and Documents § 651.23 Environmental impact statement. An Environmental Impact statement (EIS) is a detailed written statement required...
44 CFR 10.5 - Responsibilities.
Code of Federal Regulations, 2010 CFR
2010-10-01
... finding of no significant impact, or prepare an environmental impact statement; (3) Coordinate and provide... impact statement; (7) Circulate draft and final environmental impact statements; (8) Ensure that... upon, as appropriate, environmental assessments and impact statements of other Federal agencies and of...
44 CFR 10.5 - Responsibilities.
Code of Federal Regulations, 2011 CFR
2011-10-01
... finding of no significant impact, or prepare an environmental impact statement; (3) Coordinate and provide... impact statement; (7) Circulate draft and final environmental impact statements; (8) Ensure that... upon, as appropriate, environmental assessments and impact statements of other Federal agencies and of...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Distribution of final environmental impact statement and supplement to final environmental impact statement; news releases. 51.93 Section 51.93 Energy NUCLEAR... statement and supplement to final environmental impact statement; news releases. (a) A copy of the final...
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Distribution of final environmental impact statement and supplement to final environmental impact statement; news releases. 51.93 Section 51.93 Energy NUCLEAR... statement and supplement to final environmental impact statement; news releases. (a) A copy of the final...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Distribution of final environmental impact statement and supplement to final environmental impact statement; news releases. 51.93 Section 51.93 Energy NUCLEAR... statement and supplement to final environmental impact statement; news releases. (a) A copy of the final...
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Distribution of final environmental impact statement and supplement to final environmental impact statement; news releases. 51.93 Section 51.93 Energy NUCLEAR... statement and supplement to final environmental impact statement; news releases. (a) A copy of the final...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Distribution of final environmental impact statement and supplement to final environmental impact statement; news releases. 51.93 Section 51.93 Energy NUCLEAR... statement and supplement to final environmental impact statement; news releases. (a) A copy of the final...
10 CFR 51.85 - Draft environmental impact statement-rulemaking.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-rulemaking. 51.85... Implementing Section 102(2) Draft Environmental Impact Statements-Rulemaking § 51.85 Draft environmental impact... Commission has determined to prepare an environmental impact statement. ...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-24
... Environmental Impact Statement for the Lost Creek In-Situ Recovery (ISR) Project in Sweetwater County, WY; Supplement to the Generic Environmental Impact Statement for In-Situ Leach Uranium Milling Facilities AGENCY... Statement (SEIS) to the Generic Environmental Impact Statement for In- Situ Leach Uranium Milling Facilities...
Reinstein, A; Dery, R J
1999-10-01
The American Institute of Certified Public Accountants' Statement on Auditing Standards (SAS) No. 82, Consideration of Fraud in a Financial Statement Audit, requires independent auditors to obtain reasonable assurance that financial statements are free of material mis-statements caused by error or fraud. SAS No. 82 provides guidance for independent auditors to use to help detect and document risk factors related to potential fraud. But while SAS No. 82 suggests how auditors should assess the potential for fraud, it does not expand their detection responsibility. Accordingly, financial managers should discuss thoroughly with auditors the scope and focus of an audit as a means to further their compliance efforts.
10 CFR 51.94 - Requirement to consider final environmental impact statement.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Requirement to consider final environmental impact...-Regulations Implementing Section 102(2) Final Environmental Impact Statements-General Requirements § 51.94 Requirement to consider final environmental impact statement. The final environmental impact statement...
26 CFR 1.985-0 - Outline of regulation.
Code of Federal Regulations, 2010 CFR
2010-04-01
... dollar. (d) Single functional currency for a foreign corporation. (e) Translation of nonfunctional...) Scope and effective date. (b) Statement of method. (c) Translation into United States dollars. (d...
1 CFR 10.2 - Scope and sources.
Code of Federal Regulations, 2014 CFR
2014-01-01
... transcripts or text issued by the Office of the White House Press Secretary, including— (1) Communications to... of Presidential appointments and nominations; (2) White House statements and announcements on...
1 CFR 10.2 - Scope and sources.
Code of Federal Regulations, 2013 CFR
2013-01-01
... transcripts or text issued by the Office of the White House Press Secretary, including— (1) Communications to... of Presidential appointments and nominations; (2) White House statements and announcements on...
1 CFR 10.2 - Scope and sources.
Code of Federal Regulations, 2012 CFR
2012-01-01
... transcripts or text issued by the Office of the White House Press Secretary, including— (1) Communications to... of Presidential appointments and nominations; (2) White House statements and announcements on...
43 CFR 46.400 - Timing of environmental impact statement development.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Timing of environmental impact statement... IMPLEMENTATION OF THE NATIONAL ENVIRONMENTAL POLICY ACT OF 1969 Environmental Impact Statements § 46.400 Timing of environmental impact statement development. The bureau must prepare an environmental impact...
10 CFR 51.91 - Final environmental impact statement-contents.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Final environmental impact statement-contents. 51.91... Implementing Section 102(2) Final Environmental Impact Statements-General Requirements § 51.91 Final environmental impact statement—contents. (a)(1) The final environmental impact statement will include responses...
Code of Federal Regulations, 2010 CFR
2010-04-01
... fullest extent practicable the Environmental Assessment or, when required, Environmental Impact Statement.... For each environmental assessment and impact statement, the appropriate RFO will establish a specific...) Environmental Impact Statements. Environmental Impact Statements (EIS's) as required under Section 102(2)(C) of...
Code of Federal Regulations, 2011 CFR
2011-04-01
... fullest extent practicable the Environmental Assessment or, when required, Environmental Impact Statement.... For each environmental assessment and impact statement, the appropriate RFO will establish a specific...) Environmental Impact Statements. Environmental Impact Statements (EIS's) as required under Section 102(2)(C) of...
10 CFR 51.118 - Final environmental impact statement-notice of availability.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Final environmental impact statement-notice of... environmental impact statement—notice of availability. (a) Upon completion of a final environmental impact statement or any supplement to a final environmental impact statement, the appropriate NRC staff director...
10 CFR 51.118 - Final environmental impact statement-notice of availability.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Final environmental impact statement-notice of... environmental impact statement—notice of availability. (a) Upon completion of a final environmental impact statement or any supplement to a final environmental impact statement, the appropriate NRC staff director...
10 CFR 51.118 - Final environmental impact statement-notice of availability.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Final environmental impact statement-notice of... environmental impact statement—notice of availability. (a) Upon completion of a final environmental impact statement or any supplement to a final environmental impact statement, the appropriate NRC staff director...
10 CFR 51.70 - Draft environmental impact statement-general.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Draft environmental impact statement-general. 51.70... Implementing Section 102(2) Environmental Impact Statements § 51.70 Draft environmental impact statement—general. (a) The NRC staff will prepare a draft environmental impact statement as soon as practicable...
10 CFR 51.70 - Draft environmental impact statement-general.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Draft environmental impact statement-general. 51.70... Implementing Section 102(2) Environmental Impact Statements § 51.70 Draft environmental impact statement—general. (a) The NRC staff will prepare a draft environmental impact statement as soon as practicable...
10 CFR 51.70 - Draft environmental impact statement-general.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Draft environmental impact statement-general. 51.70... Implementing Section 102(2) Environmental Impact Statements § 51.70 Draft environmental impact statement—general. (a) The NRC staff will prepare a draft environmental impact statement as soon as practicable...
10 CFR 51.70 - Draft environmental impact statement-general.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Draft environmental impact statement-general. 51.70... Implementing Section 102(2) Environmental Impact Statements § 51.70 Draft environmental impact statement—general. (a) The NRC staff will prepare a draft environmental impact statement as soon as practicable...
10 CFR 51.70 - Draft environmental impact statement-general.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-general. 51.70... Implementing Section 102(2) Environmental Impact Statements § 51.70 Draft environmental impact statement—general. (a) The NRC staff will prepare a draft environmental impact statement as soon as practicable...
10 CFR 51.118 - Final environmental impact statement-notice of availability.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Final environmental impact statement-notice of... environmental impact statement—notice of availability. (a) Upon completion of a final environmental impact statement or any supplement to a final environmental impact statement, the appropriate NRC staff director...
10 CFR 51.117 - Draft environmental impact statement-notice of availability.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-notice of... environmental impact statement—notice of availability. (a) Upon completion of a draft environmental impact statement or any supplement to a draft environmental impact statement, the appropriate NRC staff director...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-06
... Four Programmatic Environmental Impact Statements for the Northern Border Between the United States and...: Notice of Intent to Prepare Programmatic Environmental Impact Statements; Request for Comments; and... four Programmatic Environmental Impact Statements (PEISs) to identify and assess potential impacts upon...
10 CFR 51.53 - Postconstruction environmental reports.
Code of Federal Regulations, 2011 CFR
2011-01-01
... impact statement; supplements to the final environmental impact statement, including supplements prepared at the license renewal stage; NRC staff-prepared final generic environmental impact statements; and... reflect new information in addition to that discussed in the final environmental impact statement prepared...
77 FR 25782 - Environmental Impact Statement: Madison County, IL
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-01
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement...: The FHWA is issuing this notice of intent to advise the public that an Environmental Impact Statement... the Illinois Department of Transportation (IDOT) will prepare an Environmental Impact Statement (EIS...
Paul H. Gobster; Wei-Ning Xiang
2012-01-01
From time to time it is appropriate for editors to revisit a journal's aims and scope and assess whether the statement accurately describes what the journal is about to current and potential participants in the journal community as well as to broader societies of concern. With the third editorship of Landscape and Urban Planning now having been involved in...
75 FR 9015 - Environmental Impact Statement: Cook County, IL
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-26
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement: Cook... FHWA is issuing this notice to advise the public that an environmental impact statement will be... Department of Transportation, will prepare an environmental impact statement (EIS) on a proposal to improve...
7 CFR 1794.61 - Environmental impact statement.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 12 2010-01-01 2010-01-01 false Environmental impact statement. 1794.61 Section 1794..., DEPARTMENT OF AGRICULTURE (CONTINUED) ENVIRONMENTAL POLICIES AND PROCEDURES Procedure for Environmental Impact Statements § 1794.61 Environmental impact statement. An EIS shall be prepared in accordance with...
40 CFR 1508.11 - Environmental impact statement.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 32 2010-07-01 2010-07-01 false Environmental impact statement. 1508.11 Section 1508.11 Protection of Environment COUNCIL ON ENVIRONMENTAL QUALITY TERMINOLOGY AND INDEX § 1508.11 Environmental impact statement. Environmental impact statement means a detailed written...
43 CFR 46.425 - Identification of the preferred alternative in an environmental impact statement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... alternative in an environmental impact statement. 46.425 Section 46.425 Public Lands: Interior Office of the... Impact Statements § 46.425 Identification of the preferred alternative in an environmental impact statement. (a) Unless another law prohibits the expression of a preference, the draft environmental impact...
22 CFR 216.7 - Environmental impact statements.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 22 Foreign Relations 1 2011-04-01 2011-04-01 false Environmental impact statements. 216.7 Section... Environmental impact statements. (a) Applicability. An Environmental Impact Statement shall be prepared when agency actions significantly affect: (1) The global environment or areas outside the jurisdiction of any...
76 FR 13017 - Environmental Impact Statement: Los Angeles County, CA
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-09
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement: Los... to advise the public that a Draft Environmental Impact Statement will be prepared for a proposed... prepare a Draft Environmental Impact Statement on a proposal for the State Route 710 Gap North Closure...
10 CFR 51.77 - Distribution of draft environmental impact statement.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Production and Utilization Facilities § 51.77 Distribution of draft environmental impact statement. (a) In addition to the distribution...
10 CFR 51.77 - Distribution of draft environmental impact statement.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Production and Utilization Facilities § 51.77 Distribution of draft environmental impact statement. (a) In addition to the distribution...
10 CFR 51.77 - Distribution of draft environmental impact statement.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Production and Utilization Facilities § 51.77 Distribution of draft environmental impact statement. (a) In addition to the distribution...
10 CFR 51.77 - Distribution of draft environmental impact statement.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Production and Utilization Facilities § 51.77 Distribution of draft environmental impact statement. (a) In addition to the distribution...
16 CFR 1.85 - Final environmental impact statements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Final environmental impact statements. 1.85... Final environmental impact statements. (a) After the close of the comment period, the Bureau responsible for the matter will consider the comments received on the draft environmental impact statement and...
10 CFR 51.77 - Distribution of draft environmental impact statement.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Distribution of draft environmental impact statement. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Production and Utilization Facilities § 51.77 Distribution of draft environmental impact statement. (a) In addition to the distribution...
7 CFR 372.10 - Supplementing environmental impact statements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 5 2010-01-01 2010-01-01 false Supplementing environmental impact statements. 372.10... PROCEDURES § 372.10 Supplementing environmental impact statements. Once a decision to supplement an environmental impact statement is made, a notice of intent will be published. The administrative record will...
22 CFR 216.7 - Environmental impact statements.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 22 Foreign Relations 1 2013-04-01 2013-04-01 false Environmental impact statements. 216.7 Section... Environmental impact statements. (a) Applicability. An Environmental Impact Statement shall be prepared when... nation (e.g., the oceans); (2) The environment of the United States; or (3) Other aspects of the...
22 CFR 216.7 - Environmental impact statements.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 22 Foreign Relations 1 2014-04-01 2014-04-01 false Environmental impact statements. 216.7 Section... Environmental impact statements. (a) Applicability. An Environmental Impact Statement shall be prepared when... nation (e.g., the oceans); (2) The environment of the United States; or (3) Other aspects of the...
22 CFR 216.7 - Environmental impact statements.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Environmental impact statements. 216.7 Section... Environmental impact statements. (a) Applicability. An Environmental Impact Statement shall be prepared when... nation (e.g., the oceans); (2) The environment of the United States; or (3) Other aspects of the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-15
... Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San Bernardino County... Resources Management Plan/Environmental Impact Statement for Mojave National Preserve. SUMMARY: Pursuant to... preparing a Water Resources Management Plan/Environmental Impact Statement (WRMP/EIS). This plan is intended...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-12
...] Environmental Impact Statement for Proposed General Management Plan, Pinnacles National Monument, San Benito and... Environmental Impact Statement. SUMMARY: The National Park Service is terminating the preparation of an Environmental Impact Statement (EIS) for the General Management Plan, Pinnacles National Monument, California. A...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-18
... DEPARTMENT OF THE INTERIOR National Park Service Final Environmental Impact Statement for the... Interior. ACTION: Notice of Availability of the Final Environmental Impact Statement for the General... Environmental Impact Statement for the General Management Plan for Monocacy National Battlefield. The plan will...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-27
... Draft Supplemental Environmental Impact Statement for the Proposed San Acacia to Bosque del Apache... prepared a draft Supplemental Environmental Impact Statement (SEIS) on the findings of a flood risk...: Previously, an environmental impact statement (1992) and a supplement (1977) were published regarding this...
16 CFR 1.84 - Draft environmental impact statements: Availability and comment.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 16 Commercial Practices 1 2011-01-01 2011-01-01 false Draft environmental impact statements... Environmental Policy Act of 1969 § 1.84 Draft environmental impact statements: Availability and comment. Except for proposals for legislation, environmental impact statements shall be prepared in two stages: Draft...
16 CFR 1.84 - Draft environmental impact statements: Availability and comment.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 16 Commercial Practices 1 2013-01-01 2013-01-01 false Draft environmental impact statements... Environmental Policy Act of 1969 § 1.84 Draft environmental impact statements: Availability and comment. Except for proposals for legislation, environmental impact statements shall be prepared in two stages: Draft...
16 CFR 1.84 - Draft environmental impact statements: Availability and comment.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 16 Commercial Practices 1 2014-01-01 2014-01-01 false Draft environmental impact statements... Environmental Policy Act of 1969 § 1.84 Draft environmental impact statements: Availability and comment. Except for proposals for legislation, environmental impact statements shall be prepared in two stages: Draft...
16 CFR 1.84 - Draft environmental impact statements: Availability and comment.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 16 Commercial Practices 1 2012-01-01 2012-01-01 false Draft environmental impact statements... Environmental Policy Act of 1969 § 1.84 Draft environmental impact statements: Availability and comment. Except for proposals for legislation, environmental impact statements shall be prepared in two stages: Draft...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-09
... Breach Restoration Draft Environmental Impact Statement, Rocky Mountain National Park, CO AGENCY... Environmental Impact Statement for the Grand Ditch Breach Restoration, Rocky Mountain National Park. SUMMARY... announces the availability of a Draft Environmental Impact Statement for the Grand Ditch Breach Restoration...
40 CFR 1501.4 - Whether to prepare an environmental impact statement.
Code of Federal Regulations, 2010 CFR
2010-07-01
... impact statement. 1501.4 Section 1501.4 Protection of Environment COUNCIL ON ENVIRONMENTAL QUALITY NEPA AND AGENCY PLANNING § 1501.4 Whether to prepare an environmental impact statement. In determining whether to prepare an environmental impact statement the Federal agency shall: (a) Determine under its...
16 CFR 1.84 - Draft environmental impact statements: Availability and comment.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Draft environmental impact statements... Environmental Policy Act of 1969 § 1.84 Draft environmental impact statements: Availability and comment. Except for proposals for legislation, environmental impact statements shall be prepared in two stages: Draft...
43 CFR 46.445 - Preparing a legislative environmental impact statement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... IMPLEMENTATION OF THE NATIONAL ENVIRONMENTAL POLICY ACT OF 1969 Environmental Impact Statements § 46.445 Preparing a legislative environmental impact statement. When required under 40 CFR 1506.8, the Department must ensure that a legislative environmental impact statement is included as a part of the formal...
39 CFR 775.12 - Time frames for environmental impact statement actions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 39 Postal Service 1 2010-07-01 2010-07-01 false Time frames for environmental impact statement... NATIONAL ENVIRONMENTAL POLICY ACT PROCEDURES § 775.12 Time frames for environmental impact statement... environmental impact statements received in that office during the preceding week. The minimum time periods for...
76 FR 12788 - Environmental Impact Statement for a Proposed Urban Rail system in Austin, TX
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-08
... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Environmental Impact Statement for a... Intent to Prepare an Environmental Impact Statement. SUMMARY: The Federal Transit Administration (FTA... Impact Statement (EIS) for the proposed Urban Rail system in Austin, Texas. The EIS will be prepared in...
DOT National Transportation Integrated Search
1997-06-04
The scope of CVO includes the operations associated with moving goods and passengers via commercial vehicles over the North American highway system and the activities necessary to regulate these operations. It includes activities related to safety as...
A survey: how periodontists and other dental professionals view the scope of periodontics.
Chang, Peter K; Hall, Joshua; Finkelman, Matthew; Park, Angel; Levi, Paul A
2014-07-01
How do periodontists think of themselves when they define their practices? How do other dental professionals view the scope of the specialty of periodontology? A strong component of periodontal residency programs is extracting teeth and preserving or building bony ridges for the eventual placement of implants. Has the discipline of periodontology moved away from retaining and treating the natural dentition? By the use of a rank-order survey, the practice of periodontology was defined by periodontists and other dental professionals. In a pilot study, respondents were asked to list the answers to the question, "What is a periodontist?" The results were consolidated into eight statements. The eight statements were placed into an anonymous rank-order survey, and more than 1,200 responses were returned. The responses primarily came from periodontists, hygienists, general practitioners, dental students, and dental hygiene students. "Periodontists surgically treat advanced gum and bone infection problems" was considered the most important statement in all of the cohorts. The least important statement considered by all was, "Periodontists are educators promoting health." Non-periodontist dentists (NPDs) ranked the statement, "Periodontists perform dental implants and related procedures" less importantly (P <0.001) than the periodontists. The non-periodontist cohort (NPC), which includes NPDs and dental hygienists, ranked the statement, "Periodontists' treatments help general dentists and other specialists increase successful therapeutic outcomes" as second most important. The results of this survey indicate that periodontists ranked the placement of implants and their related procedures higher than the NPC. NPDs appear to value periodontists in treating the natural dentition for their patients. The NPC appreciates that periodontal therapy done by periodontists increases their therapeutic success for their patients.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-01
... DEPARTMENT OF THE INTERIOR National Park Service Draft Environmental Impact Statement on a Denali..., Interior. ACTION: Notice of availability of the Draft Environmental Impact Statement on a Denali Park Road... announces the availability of a Draft Environmental Impact Statement (DEIS) on a Denali Park Road Vehicle...
Code of Federal Regulations, 2013 CFR
2013-01-01
... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...
Code of Federal Regulations, 2014 CFR
2014-01-01
... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...
Code of Federal Regulations, 2011 CFR
2011-01-01
... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...
Code of Federal Regulations, 2012 CFR
2012-01-01
... required. 5 The impact statement shall take account of dose commitments and health effects from fuel cycle... the site proposed. The draft environmental impact statement must not include an assessment of the... certification environmental assessment, then the draft combined license environmental impact statement shall...
18 CFR 380.7 - Format of an environmental impact statement.
Code of Federal Regulations, 2010 CFR
2010-04-01
... environmental impact statement. 380.7 Section 380.7 Conservation of Power and Water Resources FEDERAL ENERGY... ENVIRONMENTAL POLICY ACT § 380.7 Format of an environmental impact statement. In addition to the requirements for an environmental impact statement prescribed in 40 CFR 1502.10 of the regulations of the Council...
10 CFR 51.92 - Supplement to the final environmental impact statement.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Supplement to the final environmental impact statement. 51...-Regulations Implementing Section 102(2) Final Environmental Impact Statements-General Requirements § 51.92 Supplement to the final environmental impact statement. (a) If the proposed action has not been taken, the...
40 CFR 124.61 - Final environmental impact statement.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Final environmental impact statement... environmental impact statement. No final NPDES permit for a new source shall be issued until at least 30 days after the date of issuance of a final environmental impact statement if one is required under 40 CFR 6...
47 CFR 1.1315 - The Draft Environmental Impact Statement (DEIS); Comments.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false The Draft Environmental Impact Statement (DEIS... Environmental Impact Statement (DEIS); Comments. (a) The DEIS shall include: (1) A concise description of the... way to comment on the environmental impact of the facilities, a statement of his or her qualifications...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-21
... DEPARTMENT OF ENERGY Notice of Intent To Prepare a Programmatic Environmental Impact Statement for...: Notice of intent to prepare a programmatic environmental impact statement for the DOE Uranium Leasing Program. SUMMARY: DOE announces its intent to prepare a Programmatic Environmental Impact Statement (PEIS...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-05
... Environmental Impact Statement for the Nichols Ranch In-Situ Recovery Project in Campbell and Johnson Counties, WY; Supplement to the Generic Environmental Impact Statement for In-Situ Leach Uranium Milling... Environmental Impact Statement (Draft SEIS) for the Nichols Ranch In- Situ Recovery (ISR) Project closes on...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-11
... Environmental Impact Statement; West Waukesha Bypass, Waukesha County, WI AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of Intent to prepare an Environmental Impact Statement. SUMMARY: The FHWA is issuing this notice to advise the public that an Environmental Impact Statement (EIS) will be prepared for...
7 CFR 1773.38 - Scope of engagement.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 1773.45 be performed annually by the CPA during the audit of the RUS borrowers' financial statements, which audit procedures may be in addition to the conduct of a GAGAS audit. (b) The CPA must exercise...
7 CFR 1773.38 - Scope of engagement.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 1773.45 be performed annually by the CPA during the audit of the RUS borrowers' financial statements, which audit procedures may be in addition to the conduct of a GAGAS audit. (b) The CPA must exercise...
7 CFR 1773.38 - Scope of engagement.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 1773.45 be performed annually by the CPA during the audit of the RUS borrowers' financial statements, which audit procedures may be in addition to the conduct of a GAGAS audit. (b) The CPA must exercise...
7 CFR 1773.38 - Scope of engagement.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 1773.45 be performed annually by the CPA during the audit of the RUS borrowers' financial statements, which audit procedures may be in addition to the conduct of a GAGAS audit. (b) The CPA must exercise...
7 CFR 1773.38 - Scope of engagement.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 1773.45 be performed annually by the CPA during the audit of the RUS borrowers' financial statements, which audit procedures may be in addition to the conduct of a GAGAS audit. (b) The CPA must exercise...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-14
... and Draft Environmental Impact Statement: Highway 35, Between Norfolk and South Sioux City, NE AGENCY... Environmental Impact Statement. SUMMARY: The FHWA is issuing this notice to advise the public that we are rescinding the Notice of Intent (NOI) and Draft Environmental Impact Statement (DEIS) for improvements that...
Spruit, Martijn A; Singh, Sally J; Garvey, Chris; ZuWallack, Richard; Nici, Linda; Rochester, Carolyn; Hill, Kylie; Holland, Anne E; Lareau, Suzanne C; Man, William D-C; Pitta, Fabio; Sewell, Louise; Raskin, Jonathan; Bourbeau, Jean; Crouch, Rebecca; Franssen, Frits M E; Casaburi, Richard; Vercoulen, Jan H; Vogiatzis, Ioannis; Gosselink, Rik; Clini, Enrico M; Effing, Tanja W; Maltais, François; van der Palen, Job; Troosters, Thierry; Janssen, Daisy J A; Collins, Eileen; Garcia-Aymerich, Judith; Brooks, Dina; Fahy, Bonnie F; Puhan, Milo A; Hoogendoorn, Martine; Garrod, Rachel; Schols, Annemie M W J; Carlin, Brian; Benzo, Roberto; Meek, Paula; Morgan, Mike; Rutten-van Mölken, Maureen P M H; Ries, Andrew L; Make, Barry; Goldstein, Roger S; Dowson, Claire A; Brozek, Jan L; Donner, Claudio F; Wouters, Emiel F M
2013-10-15
Pulmonary rehabilitation is recognized as a core component of the management of individuals with chronic respiratory disease. Since the 2006 American Thoracic Society (ATS)/European Respiratory Society (ERS) Statement on Pulmonary Rehabilitation, there has been considerable growth in our knowledge of its efficacy and scope. The purpose of this Statement is to update the 2006 document, including a new definition of pulmonary rehabilitation and highlighting key concepts and major advances in the field. A multidisciplinary committee of experts representing the ATS Pulmonary Rehabilitation Assembly and the ERS Scientific Group 01.02, "Rehabilitation and Chronic Care," determined the overall scope of this update through group consensus. Focused literature reviews in key topic areas were conducted by committee members with relevant clinical and scientific expertise. The final content of this Statement was agreed on by all members. An updated definition of pulmonary rehabilitation is proposed. New data are presented on the science and application of pulmonary rehabilitation, including its effectiveness in acutely ill individuals with chronic obstructive pulmonary disease, and in individuals with other chronic respiratory diseases. The important role of pulmonary rehabilitation in chronic disease management is highlighted. In addition, the role of health behavior change in optimizing and maintaining benefits is discussed. The considerable growth in the science and application of pulmonary rehabilitation since 2006 adds further support for its efficacy in a wide range of individuals with chronic respiratory disease.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-06
...-FF08ECAR00] Draft Supplemental Environmental Impact Report/Environmental Impact Statement for a Proposed... Conservation Commission (CVCC), has prepared a joint draft Supplemental Environmental Impact Report/Environmental Impact Statement (draft Supplemental EIR/EIS) under the National Environmental Policy Act (NEPA...
23 CFR 771.125 - Final environmental impact statements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Final environmental impact statements. 771.125 Section... ENVIRONMENT ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.125 Final environmental impact statements. (a)(1..., economic, or environmental impacts of the action may need to be more fully explored; (iii) the impacts of...
Code of Federal Regulations, 2014 CFR
2014-07-01
... refers to the coverage of general matters in broader environmental impact statements (such as national... regional or basinwide program statements or ultimately site-specific statements) incorporating by reference..., or policy environmental impact statement to a program, plan, or policy statement or analysis of...
Code of Federal Regulations, 2011 CFR
2011-07-01
... refers to the coverage of general matters in broader environmental impact statements (such as national... regional or basinwide program statements or ultimately site-specific statements) incorporating by reference..., or policy environmental impact statement to a program, plan, or policy statement or analysis of...
Code of Federal Regulations, 2012 CFR
2012-07-01
... refers to the coverage of general matters in broader environmental impact statements (such as national... regional or basinwide program statements or ultimately site-specific statements) incorporating by reference..., or policy environmental impact statement to a program, plan, or policy statement or analysis of...
Code of Federal Regulations, 2013 CFR
2013-07-01
... refers to the coverage of general matters in broader environmental impact statements (such as national... regional or basinwide program statements or ultimately site-specific statements) incorporating by reference..., or policy environmental impact statement to a program, plan, or policy statement or analysis of...
Code of Federal Regulations, 2010 CFR
2010-07-01
... refers to the coverage of general matters in broader environmental impact statements (such as national... regional or basinwide program statements or ultimately site-specific statements) incorporating by reference..., or policy environmental impact statement to a program, plan, or policy statement or analysis of...
44 CFR 10.5 - Responsibilities.
Code of Federal Regulations, 2012 CFR
2012-10-01
...) The Regional Administrators shall, for each action not categorically excluded from this regulation and... significant impact, or prepare an environmental impact statement; (3) Coordinate and provide information... impact statement; (7) Circulate draft and final environmental impact statements; (8) Ensure that...
23 CFR 771.130 - Supplemental environmental impact statements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Supplemental environmental impact statements. 771.130... ENVIRONMENT ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.130 Supplemental environmental impact statements... significant environmental impacts that were not evaluated in the EIS; or (2) New information or circumstances...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-05
... Programmatic Environmental Impact Statement and Restoration Plan To Compensate for Injuries to Natural... Environmental Impact Statement and Restoration Plan; request for comments. SUMMARY: NOAA, the Department of the... Statement (PEIS) and Draft Restoration Plan are being released for public comment. The Restoration Plan...
44 CFR 10.5 - Responsibilities.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Responsibilities. (a) The Regional Administrators shall, for each action not categorically excluded from this... finding of no significant impact, or prepare an environmental impact statement; (3) Coordinate and provide... impact statement; (7) Circulate draft and final environmental impact statements; (8) Ensure that...
44 CFR 10.5 - Responsibilities.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Responsibilities. (a) The Regional Administrators shall, for each action not categorically excluded from this... finding of no significant impact, or prepare an environmental impact statement; (3) Coordinate and provide... impact statement; (7) Circulate draft and final environmental impact statements; (8) Ensure that...
32 CFR 989.16 - Environmental impact statement.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 6 2010-07-01 2010-07-01 false Environmental impact statement. 989.16 Section... PROTECTION ENVIRONMENTAL IMPACT ANALYSIS PROCESS (EIAP) § 989.16 Environmental impact statement. (a) Certain classes of environmental impacts normally require preparation of an EIS (40 CFR 1501.4). These include...
49 CFR 520.28 - Preparation of final environmental impact statements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 6 2010-10-01 2010-10-01 false Preparation of final environmental impact... ENVIRONMENTAL IMPACTS Procedures § 520.28 Preparation of final environmental impact statements. (a) If the... for the action shall prepare a final environmental impact statement (FEIS), taking into account all...
Lindsey, Merry L; Mayr, Manuel; Gomes, Aldrin V; Delles, Christian; Arrell, D Kent; Murphy, Anne M; Lange, Richard A; Costello, Catherine E; Jin, Yu-Fang; Laskowitz, Daniel T; Sam, Flora; Terzic, Andre; Van Eyk, Jennifer; Srinivas, Pothur R
2015-09-01
The year 2014 marked the 20th anniversary of the coining of the term proteomics. The purpose of this scientific statement is to summarize advances over this period that have catalyzed our capacity to address the experimental, translational, and clinical implications of proteomics as applied to cardiovascular health and disease and to evaluate the current status of the field. Key successes that have energized the field are delineated; opportunities for proteomics to drive basic science research, facilitate clinical translation, and establish diagnostic and therapeutic healthcare algorithms are discussed; and challenges that remain to be solved before proteomic technologies can be readily translated from scientific discoveries to meaningful advances in cardiovascular care are addressed. Proteomics is the result of disruptive technologies, namely, mass spectrometry and database searching, which drove protein analysis from 1 protein at a time to protein mixture analyses that enable large-scale analysis of proteins and facilitate paradigm shifts in biological concepts that address important clinical questions. Over the past 20 years, the field of proteomics has matured, yet it is still developing rapidly. The scope of this statement will extend beyond the reaches of a typical review article and offer guidance on the use of next-generation proteomics for future scientific discovery in the basic research laboratory and clinical settings. © 2015 American Heart Association, Inc.
78 FR 34377 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-07
... ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-9009-5] Environmental Impacts Statements; Notice of....epa.gov/compliance/nepa/ . Weekly receipt of Environmental Impact Statements. Filed 05/28/2013 Through... Corridor Light Rail Transit Project, Construction-Related Potential Impacts on Business Revenues, Review...
75 FR 8988 - Environmental Impact Statements; Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-26
... DEPARTMENT OF THE INTERIOR Environmental Impact Statements; Availability AGENCY: National Park Service. ACTION: Notice of availability for the Record of Decision on the Final Environmental Impact...) for the final Environmental Impact Statement (EIS) for the disposition of the Bureau of Mines property...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carlson, T.A., Fluor Daniel Hanford
1997-02-06
The Immobilized Low-Activity Waste Interim Storage subproject will provide storage capacity for immobilized low-activity waste product sold to the U.S. Department of Energy by the privatization contractor. This statement of work describes the work scope (encompassing definition of new installations and retrofit modifications to four existing grout vaults), to be performed by the Architect-Engineer, in preparation of a conceptual design for the Immobilized Low-Activity Waste Interim Storage Facility.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-18
... DEPARTMENT OF DEFENSE Department of the Army Programmatic Environmental Impact Statement for the... Programmatic Environmental Impact Statement (PEIS) to evaluate the impacts of current and future training and... (NEPA) to evaluate the environmental impacts of proposed alternatives for implementing the training and...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-28
... statement process should draw attention to positive impacts, not just negative impacts. In the interest of... environment. The FTA and LACMTA will evaluate all significant environmental, social, and economic impacts of... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Environmental Impact Statement for the...
Positive emotions broaden the scope of attention and thought-action repertoires
Fredrickson, Barbara L.; Branigan, Christine
2011-01-01
The broaden-and-build theory (Fredrickson, 1998, 2001) hypothesises that positive emotions broaden the scope of attention and thought-action repertoires. Two experiments with 104 college students tested these hypotheses. In each, participants viewed a film that elicited (a) amusement, (b) contentment, (c) neutrality, (d) anger, or (e) anxiety. Scope of attention was assessed using a global-local visual processing task (Experiment 1) and thought-action repertoires were assessed using a Twenty Statements Test (Experiment 2). Compared to a neutral state, positive emotions broadened the scope of attention in Experiment 1 and thought-action repertoires in Experiment 2. In Experiment 2, negative emotions, relative to a neutral state, narrowed thought-action repertoires. Implications for promoting emotional well-being and physical health are discussed. PMID:21852891
Code of Federal Regulations, 2011 CFR
2011-01-01
... whether it is practicable to adopt, without further supplementation, the environmental impact statement... supplementation of the environmental impact statement by NRC is required, it shall file its final supplemental environmental impact statement with the Environmental Protection Agency, furnish that statement to commenting...
12 CFR 365.101 - Authority, purpose, and scope.
Code of Federal Regulations, 2011 CFR
2011-01-01
...), their subsidiaries (except brokers, dealers, persons providing insurance, investment companies, and investment advisers) (collectively referred to in this subpart as insured State nonmember banks), and... 365.101 Banks and Banking FEDERAL DEPOSIT INSURANCE CORPORATION REGULATIONS AND STATEMENTS OF GENERAL...
47 CFR 1.54 - Petitions for forbearance must be complete as filed.
Code of Federal Regulations, 2010 CFR
2010-10-01
... requested relief. (b) Prima facie case. Petitions for forbearance must contain facts and arguments which, if... statement of the petitioner's prima facie case for relief. (3) Appendices that list: (i) The scope of relief...
44 CFR 10.10 - Preparation of environmental impact statements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... environmental impact statement will be prepared and publication of the notice of intent, the Regional... Regional Administrator may at any time supplement a draft or final environmental impact statement. The Regional Administrator shall prepare a supplement to either the draft or final environmental impact...
10 CFR 51.85 - Draft environmental impact statement-rulemaking.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Draft environmental impact statement-rulemaking. 51.85 Section 51.85 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR... Implementing Section 102(2) Draft Environmental Impact Statements-Rulemaking § 51.85 Draft environmental impact...
10 CFR 51.85 - Draft environmental impact statement-rulemaking.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Draft environmental impact statement-rulemaking. 51.85 Section 51.85 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR... Implementing Section 102(2) Draft Environmental Impact Statements-Rulemaking § 51.85 Draft environmental impact...
10 CFR 51.85 - Draft environmental impact statement-rulemaking.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Draft environmental impact statement-rulemaking. 51.85 Section 51.85 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR... Implementing Section 102(2) Draft Environmental Impact Statements-Rulemaking § 51.85 Draft environmental impact...
10 CFR 51.85 - Draft environmental impact statement-rulemaking.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Draft environmental impact statement-rulemaking. 51.85 Section 51.85 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR... Implementing Section 102(2) Draft Environmental Impact Statements-Rulemaking § 51.85 Draft environmental impact...
23 CFR 771.130 - Supplemental environmental impact statements.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Supplemental environmental impact statements. 771.130... ENVIRONMENT ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.130 Supplemental environmental impact statements... supplemented whenever the Administration determines that: (1) Changes to the proposed action would result in...
75 FR 34666 - Stream Protection Rule; Environmental Impact Statement
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-18
... DEPARTMENT OF THE INTERIOR Office of Surface Mining Reclamation and Enforcement 30 CFR Chapter VII RIN 1029-AC63 Stream Protection Rule; Environmental Impact Statement AGENCY: Office of Surface Mining... impact statement. [[Page 34667
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-05
... Environmental Impact Statement for the Moore Ranch In-Situ Recovery Project in Campbell County, WY; Supplement to the Generic Environmental Impact Statement for In-Situ Leach Uranium Milling Facilities AGENCY... Statement (Draft SEIS) for the Moore Ranch In-Situ Recovery (ISR) Project closes on February 1, 2010. The...
49 CFR 520.24 - Internal processing of draft environmental impact statements.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 6 2014-10-01 2014-10-01 false Internal processing of draft environmental impact statements. 520.24 Section 520.24 Transportation Other Regulations Relating to Transportation (Continued... ENVIRONMENTAL IMPACTS Procedures § 520.24 Internal processing of draft environmental impact statements. Before...
10 CFR 51.76 - Draft environmental impact statement-limited work authorization.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Draft environmental impact statement-limited work...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Production and Utilization Facilities § 51.76 Draft environmental impact statement—limited work authorization. The NRC will prepare a...
10 CFR 51.76 - Draft environmental impact statement-limited work authorization.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Draft environmental impact statement-limited work...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Production and Utilization Facilities § 51.76 Draft environmental impact statement—limited work authorization. The NRC will prepare a...
10 CFR 51.76 - Draft environmental impact statement-limited work authorization.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Draft environmental impact statement-limited work...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Production and Utilization Facilities § 51.76 Draft environmental impact statement—limited work authorization. The NRC will prepare a...
49 CFR 520.24 - Internal processing of draft environmental impact statements.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 6 2011-10-01 2011-10-01 false Internal processing of draft environmental impact statements. 520.24 Section 520.24 Transportation Other Regulations Relating to Transportation (Continued... ENVIRONMENTAL IMPACTS Procedures § 520.24 Internal processing of draft environmental impact statements. Before...
10 CFR 51.76 - Draft environmental impact statement-limited work authorization.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Draft environmental impact statement-limited work...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Production and Utilization Facilities § 51.76 Draft environmental impact statement—limited work authorization. The NRC will prepare a...
49 CFR 520.24 - Internal processing of draft environmental impact statements.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 6 2012-10-01 2012-10-01 false Internal processing of draft environmental impact statements. 520.24 Section 520.24 Transportation Other Regulations Relating to Transportation (Continued... ENVIRONMENTAL IMPACTS Procedures § 520.24 Internal processing of draft environmental impact statements. Before...
49 CFR 520.24 - Internal processing of draft environmental impact statements.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 6 2013-10-01 2013-10-01 false Internal processing of draft environmental impact statements. 520.24 Section 520.24 Transportation Other Regulations Relating to Transportation (Continued... ENVIRONMENTAL IMPACTS Procedures § 520.24 Internal processing of draft environmental impact statements. Before...
10 CFR 51.76 - Draft environmental impact statement-limited work authorization.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-limited work...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Production and Utilization Facilities § 51.76 Draft environmental impact statement—limited work authorization. The NRC will prepare a...
36 CFR 220.5 - Environmental impact statement and record of decision.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Environmental impact..., DEPARTMENT OF AGRICULTURE NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) COMPLIANCE § 220.5 Environmental impact statement and record of decision. (a) Classes of actions normally requiring environmental impact statements...
21 CFR 25.52 - Environmental impact statements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Environmental impact statements. 25.52 Section 25... ENVIRONMENTAL IMPACT CONSIDERATIONS Public Participation and Notification of Environmental Documents § 25.52 Environmental impact statements. (a) If FDA determines that an EIS is necessary for an action involving...
23 CFR 771.123 - Draft environmental impact statements.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Draft environmental impact statements. 771.123 Section... ENVIRONMENT ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.123 Draft environmental impact statements. (a) A draft EIS shall be prepared when the Administration determines that the action is likely to cause...
10 CFR 51.80 - Draft environmental impact statement-materials license.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 2 2013-01-01 2013-01-01 false Draft environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.80 Draft environmental impact statement—materials license. (a) The NRC staff will either prepare a draft environmental...
10 CFR 51.80 - Draft environmental impact statement-materials license.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 2 2012-01-01 2012-01-01 false Draft environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.80 Draft environmental impact statement—materials license. (a) The NRC staff will either prepare a draft environmental...
10 CFR 51.80 - Draft environmental impact statement-materials license.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 2 2011-01-01 2011-01-01 false Draft environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.80 Draft environmental impact statement—materials license. (a) The NRC staff will either prepare a draft environmental...
23 CFR 771.123 - Draft environmental impact statements.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Draft environmental impact statements. 771.123 Section... ENVIRONMENT ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.123 Draft environmental impact statements. (a) A draft EIS shall be prepared when the Administration determines that the action is likely to cause...
23 CFR 771.123 - Draft environmental impact statements.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Draft environmental impact statements. 771.123 Section... ENVIRONMENT ENVIRONMENTAL IMPACT AND RELATED PROCEDURES § 771.123 Draft environmental impact statements. (a) A draft EIS shall be prepared when the Administration determines that the action is likely to cause...
10 CFR 51.80 - Draft environmental impact statement-materials license.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Draft environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.80 Draft environmental impact statement—materials license. (a) The NRC staff will either prepare a draft environmental...
24 CFR 58.53 - Use of prior environmental impact statements.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Use of prior environmental impact... RESPONSIBILITIES Environmental Review Process: Environmental Impact Statement Determinations § 58.53 Use of prior environmental impact statements. Where any final EIS has been listed in the Federal Register for a project...
14 CFR 1216.315 - Processing legislative environmental impact statements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Processing legislative environmental impact... § 1216.315 Processing legislative environmental impact statements. (a) Preparation of a legislative environmental impact statement shall conform to the requirements of 40 CFR 1506.8 of the CEQ Regulations. The...
49 CFR 520.29 - Internal review of final environmental impact statements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 6 2010-10-01 2010-10-01 false Internal review of final environmental impact... ENVIRONMENTAL IMPACTS Procedures § 520.29 Internal review of final environmental impact statements. (a) Upon... office originating the action, the final environmental statement shall be accompanied by a brief cover...
10 CFR 51.90 - Final environmental impact statement-general.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Final environmental impact statement-general. 51.90... Implementing Section 102(2) Final Environmental Impact Statements-General Requirements § 51.90 Final environmental impact statement—general. After receipt and consideration of comments requested pursuant to §§ 51...
10 CFR 51.80 - Draft environmental impact statement-materials license.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Draft environmental impact statement-materials license. 51...-Regulations Implementing Section 102(2) Draft Environmental Impact Statements-Materials Licenses § 51.80 Draft environmental impact statement—materials license. (a) The NRC staff will either prepare a draft environmental...
33 CFR 230.13 - Environmental Impact Statement (EIS).
Code of Federal Regulations, 2010 CFR
2010-07-01
... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Environmental Impact Statement..., DEPARTMENT OF DEFENSE PROCEDURES FOR IMPLEMENTING NEPA § 230.13 Environmental Impact Statement (EIS). An EIS... issues and impacts. The transmittal letter to EPA as well as the cover sheet should clearly identify the...
10 CFR 63.24 - Updating of application and environmental impact statement.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Updating of application and environmental impact statement... Updating of application and environmental impact statement. (a) The application must be as complete as... the time a construction authorization was issued. (c) DOE shall supplement its environmental impact...
76 FR 84 - Notice of Environmental Impact Statement; Withdrawal
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-03
... DEPARTMENT OF AGRICULTURE Forest Service Notice of Environmental Impact Statement; Withdrawal... statement. SUMMARY: The United States Department of Agriculture, Forest Service, Prescott National Forest... that significant impacts to the environment would be highly unlikely, and therefore an Environmental...
10 CFR 1021.314 - Supplemental environmental impact statements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false Supplemental environmental impact statements. 1021.314 Section 1021.314 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES Implementing Procedures § 1021.314 Supplemental environmental impact statements. (a...
75 FR 25309 - Environmental Impact Statement: Cook County, IL
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-07
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement: Cook... FHWA is issuing this Notice to advise the public that an Environmental Impact Statement (EIS) will be... project comprises several elements of the overall Chicago Region Environmental and Transportation...
10 CFR 1021.310 - Environmental impact statements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false Environmental impact statements. 1021.310 Section 1021.310 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES Implementing Procedures § 1021.310 Environmental impact statements. DOE shall prepare and...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-01
... To Prepare an Environmental Impact Statement: San Francisco County, CA AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice to rescind a Notice of Intent to prepare an Environmental Impact... Environmental Impact Statement for improvements that were proposed for the Bayview Transportation Improvements...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-25
...), determined that the proposed project may result in significant impacts to the environment, and that the preparation of an Environmental Impact Statement (EIS) is required. The Applicant proposes to implement a... Environmental Impact Statement for the Proposed Westbrook Project, Corps Permit Application Number SPK-2005...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-02
... interchange at Seltice. Impacts to the social, economic, and natural environment were minimal. After receiving... to Prepare an Environmental Impact Statement (EIS), Kootenai County, ID AGENCY: Federal Highway Administration. ACTION: Rescind Notice of Intent to prepare an Environmental Impact Statement. SUMMARY: The FHWA...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-26
... Draft Environmental Impact Statement for a Proposed Aquatic Ecosystem Restoration Project for the Quiver... its intent to prepare a Draft Environmental Impact Statement (DEIS) assessing the reasonably foreseeable environmental impact of a proposal to restore the aquatic ecosystem of the Quiver River, a...
43 CFR 46.420 - Terms used in an environmental impact statement.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Terms used in an environmental impact... IMPLEMENTATION OF THE NATIONAL ENVIRONMENTAL POLICY ACT OF 1969 Environmental Impact Statements § 46.420 Terms used in an environmental impact statement. The following terms are commonly used to describe concepts...
40 CFR 6.207 - Environmental impact statements.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Environmental impact statements. 6.207 Section 6.207 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL PROCEDURES FOR... ACTIONS EPA's NEPA Environmental Review Procedures § 6.207 Environmental impact statements. (a) The...
76 FR 78331 - Environmental Impact Statement: Jackson County, NC
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-16
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement... impact statement will be prepared for a proposed highway project from NC 107 to US 23-74 east of Sylva..., Preconstruction and Environment Specialist, Federal Highway Administration, 310 New Bern Avenue, Suite 410...
40 CFR 6.207 - Environmental impact statements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Environmental impact statements. 6.207 Section 6.207 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL PROCEDURES FOR... ACTIONS EPA's NEPA Environmental Review Procedures § 6.207 Environmental impact statements. (a) The...
16 CFR § 1021.5 - Categories of CPSC actions.
Code of Federal Regulations, 2013 CFR
2013-01-01
... environmental impact statements: (1) Regulatory actions dealing with health risks. (2) Actions requiring the... therefore, neither an environmental assessment nor an environmental impact statement is required. (These... significant environmental effects. Therefore, there are no actions for which an environmental impact statement...
78 FR 2397 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-11
... ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-9007-1] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564-7146 or http://www.epa.gov/compliance/nepa/ . Weekly receipt of Environmental Impact Statements Filed 12/31/2012 Through...
78 FR 21938 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-12
... ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-9008-6] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564-7146 or http://www.epa.gov/compliance/nepa/ . Weekly receipt of Environmental Impact Statements Filed 04/01/2013 Through...
78 FR 12309 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-22
... ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-9007-8] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564-7146 or http://www.epa.gov/compliance/nepa/ . Weekly receipt of Environmental Impact Statements Filed 02/11/2013 Through...
78 FR 26027 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-03
... ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-9008-9] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564-7146 or http://www.epa.gov/compliance/nepa/ . Weekly receipt of Environmental Impact Statements Filed 04/22/2013 Through...
16 CFR 1.88 - Implementing procedures.
Code of Federal Regulations, 2013 CFR
2013-01-01
... reviewed to assess the need for an environmental impact statement and that, where need exists, an environmental impact statement is developed to assure timely consideration of environmental factors. (d) The... environmental impact statement is needed and in its preparation. (b) The Commission will determine finally...
16 CFR 1.88 - Implementing procedures.
Code of Federal Regulations, 2012 CFR
2012-01-01
... reviewed to assess the need for an environmental impact statement and that, where need exists, an environmental impact statement is developed to assure timely consideration of environmental factors. (d) The... environmental impact statement is needed and in its preparation. (b) The Commission will determine finally...
16 CFR 1.88 - Implementing procedures.
Code of Federal Regulations, 2014 CFR
2014-01-01
... reviewed to assess the need for an environmental impact statement and that, where need exists, an environmental impact statement is developed to assure timely consideration of environmental factors. (d) The... environmental impact statement is needed and in its preparation. (b) The Commission will determine finally...
16 CFR 1.88 - Implementing procedures.
Code of Federal Regulations, 2011 CFR
2011-01-01
... reviewed to assess the need for an environmental impact statement and that, where need exists, an environmental impact statement is developed to assure timely consideration of environmental factors. (d) The... environmental impact statement is needed and in its preparation. (b) The Commission will determine finally...
75 FR 69434 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-12
... ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-8993-6] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564-1399 or http://www.epa.gov/compliance/nepa/ . Weekly receipt of Environmental Impact Statements Filed 11/01/2010 Through...
78 FR 37539 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-21
... ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-9009-7] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564-7146 or http://www.epa.gov/compliance/nepa/ . Weekly receipt of Environmental Impact Statements Filed 06/10/2013 Through...
78 FR 43200 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-19
... ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-9010-2] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564-7146 or http://www.epa.gov/compliance/nepa/ . Weekly receipt of Environmental Impact Statements Filed 07/08/2013 Through...
78 FR 32645 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-31
... ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-9009-4] Environmental Impacts Statements; Notice of Availability RESPONSIBLE AGENCY: Office of Federal Activities, General Information (202) 564-7146 or http://www.epa.gov/compliance/nepa/ . Weekly receipt of Environmental Impact Statements Filed 05/20/2013 Through...
78 FR 20714 - Environmental Impact Statement: Cook County, Illinois
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-05
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement: Cook... Department of Transportation, is preparing an environmental impact statement (EIS) on a proposal to improve.... SUMMARY: The FHWA is issuing this revised notice of intent to advise the public that an environmental...
77 FR 62235 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-12
... ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-9005-5] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564-7146 or http://www.epa.gov/compliance/nepa/ . Weekly receipt of Environmental Impact Statements Filed 10/01/2012 Through...
76 FR 80367 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-23
... ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-9000-6] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564-1399 or http://www.epa.gov/compliance/nepa/ . Weekly receipt of Environmental Impact Statements Filed 12/12/2011 Through...
77 FR 793 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-06
... ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-9000-9] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564-1399 or http://www.epa.gov/compliance/nepa/ . Weekly receipt of Environmental Impact Statements Filed 12/27/2011 through...
77 FR 56840 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-14
... ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-9005-1] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564-7146 or http://www.epa.gov/compliance/nepa/ . Weekly receipt of Environmental Impact Statements. Filed 09/03/2012 Through...
78 FR 35928 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-14
... ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-9009-6] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564-7146 or http://www.epa.gov/compliance/nepa/ . Weekly receipt of Environmental Impact Statements Filed 06/03/2013 through...
78 FR 5439 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-25
... ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-9007-3] Environmental Impacts Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564-7146 or http://www.epa.gov/compliance/nepa/ . Weekly receipt of Environmental Impact Statements Filed 01/14/2013 Through...
No need to go! Workplace studies and the resources of the revised National Statement.
Cordner, Christopher; Thomson, Colin
2007-07-01
In their article 'Unintended consequences of human research ethics committees: au revoir workplace studies?', Greg Bamber and Jennifer Sappey set out some real obstacles in the practices and attitudes of some Human Research Ethics Committees (HRECs), to research in the social sciences and particulalry in industrial sociology. They sheet home these attitudes and practices to the way in which various statements in the NHMRC's National Statement [1999] are implemented, which they say is often in 'conflict with an important stream of industrial sociological research' in Australia. They do not discuss the recently completed revision of the NS. We undertake to show that the revised National Statement meets their concerns about research in industrial sociology, and to draw attention to the resources of the revised National Statement that engage with those concerns. A more general aim is to display the greater scope, in the revised National Statement, for researchers to show to HRECs that their research is justified by virutue of its reflecting the established methodology and traditions of their discipline. The revised National Statement, we suggest, provides for a more flexible and responsive approach than its predecessor to the ethical review of many areas of research.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-06
...-Wilson Corridor Comprehensive Management Plan, Environmental Impact Statement, Grand Teton National Park... is preparing a Comprehensive Management Plan and Environmental Impact Statement (EIS) for the Moose...; (2) distinguish the corridor's fundamental and other important resources and values; (3) clearly...
43 CFR 3430.3-2 - Environmental analysis.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Juan Regional Coal Environmental Impact Statement (March 1984), the Savery Coal EIS (July 1983), and... impact statement on the application. (b) The environmental analysis may be conducted in conjunction with and included as part of the environmental impact statement required for coal activity planning under...
43 CFR 3430.3-2 - Environmental analysis.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Juan Regional Coal Environmental Impact Statement (March 1984), the Savery Coal EIS (July 1983), and... impact statement on the application. (b) The environmental analysis may be conducted in conjunction with and included as part of the environmental impact statement required for coal activity planning under...
43 CFR 3430.3-2 - Environmental analysis.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Juan Regional Coal Environmental Impact Statement (March 1984), the Savery Coal EIS (July 1983), and... impact statement on the application. (b) The environmental analysis may be conducted in conjunction with and included as part of the environmental impact statement required for coal activity planning under...
38 CFR 26.6 - Environmental documents.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) Environmental Impact Statements. The head of each VA element shall include a detailed written statement “in... Regulations, 40 CFR part 1502. An environmental impact statement shall be prepared in accordance with the following procedures: (1) Typical Classes of Action Which Normally Do Require Environmental Impact...
38 CFR 26.6 - Environmental documents.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) Environmental Impact Statements. The head of each VA element shall include a detailed written statement “in... Regulations, 40 CFR part 1502. An environmental impact statement shall be prepared in accordance with the following procedures: (1) Typical Classes of Action Which Normally Do Require Environmental Impact...
38 CFR 26.6 - Environmental documents.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) Environmental Impact Statements. The head of each VA element shall include a detailed written statement “in... Regulations, 40 CFR part 1502. An environmental impact statement shall be prepared in accordance with the following procedures: (1) Typical Classes of Action Which Normally Do Require Environmental Impact...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-22
... infrastructure development, including siting wind turbines, access roads, underground collector lines, overhead... Wildlife Service Upper Great Plains Wind Energy Draft Programmatic Environmental Impact Statement (DOE/EIS... Plains Wind Energy Draft Programmatic Environmental Impact Statement (Draft [[Page 17654
78 FR 50022 - Environmental Impact Statement; Asian Longhorned Beetle Eradication Program
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-16
... submit comments regarding the environmental impact statement by either of the following methods: Federal..., Environmental Protection Specialist, Environmental and Risk Analysis Services, PPD, APHIS, 4700 River Road Unit...] Environmental Impact Statement; Asian Longhorned Beetle Eradication Program AGENCY: Animal and Plant Health...
78 FR 78955 - Environmental Impact Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-27
... ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-9012-7] Environmental Impact Statements; Notice of Availability Responsible Agency: Office of Federal Activities, General Information (202) 564-7146 or http://www.epa.gov/compliance/nepa/ Weekly receipt of Environmental Impact Statements filed 12/16/2013 through 12...
76 FR 62405 - Environmental Impacts Statements; Notice of Availability
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-07
... ENVIRONMENTAL PROTECTION AGENCY [ER-FRL-8999-4] Environmental Impacts Statements; Notice of Availability AGENCY: Office of Federal Activities, EPA. General Information (202) 564-1399 or http://www.epa.gov/compliance/nepa/ . Weekly receipt of Environmental Impact Statements Filed 09/26/2011 Through 09...
24 CFR 58.37 - Environmental impact statement determinations.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Environmental impact statement... Classification § 58.37 Environmental impact statement determinations. (a) An EIS is required when the project is... and Urban Development ENVIRONMENTAL REVIEW PROCEDURES FOR ENTITIES ASSUMING HUD ENVIRONMENTAL...
Coates, Allan L; Graham, Brian L; McFadden, Robin G; McParland, Colm; Moosa, Dilshad; Provencher, Steeve; Road, Jeremy
2013-01-01
Canadian Thoracic Society (CTS) clinical guidelines for asthma and chronic obstructive pulmonary disease (COPD) specify that spirometry should be used to diagnose these diseases. Given the burden of asthma and COPD, most people with these diseases will be diagnosed in the primary care setting. The present CTS position statement was developed to provide guidance on key factors affecting the quality of spirometry testing in the primary care setting. The present statement may also be used to inform and guide the accreditation process for spirometry in each province. Although many of the principles discussed are equally applicable to pulmonary function laboratories and interpretation of tests by respirologists, they are held to a higher standard and are outside the scope of the present statement. PMID:23457669
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-23
... related material on the DEIS and the proposed project's impact on river navigation. All comments received... Environmental Impact Statement for the Proposed Construction of a Highway Bridge Across the Manatee River at... for the Manatee River Draft Environmental Impact Statement published in the Federal Register on July 5...
DOT National Transportation Integrated Search
1994-10-31
This document is the final environmental impact statement and final environmental impact report (FEIS/R) on the proposal by the National Railroad Passenger Corporation (Amtrak) to complete the electrification of the Northeast Corridor main line by ex...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-21
... Management Plan/Final Environmental Impact Statement, Hampton National Historic Site, Maryland AGENCY...) announces the availability of the Final Environmental Impact Statement for the General Management Plan.../Baltimore County Library, 320 York Avenue, Towson, Maryland 21204. Baltimore County Tourism Office and...
43 CFR 46.435 - Inviting comments.
Code of Federal Regulations, 2011 CFR
2011-10-01
... ENVIRONMENTAL POLICY ACT OF 1969 Environmental Impact Statements § 46.435 Inviting comments. (a) A bureau must seek comment from the public as part of the Notice of Intent to prepare an environmental impact statement and notice of availability for a draft environmental impact statement; (b) In addition to...
43 CFR 46.435 - Inviting comments.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ENVIRONMENTAL POLICY ACT OF 1969 Environmental Impact Statements § 46.435 Inviting comments. (a) A bureau must seek comment from the public as part of the Notice of Intent to prepare an environmental impact statement and notice of availability for a draft environmental impact statement; (b) In addition to...
38 CFR 26.6 - Environmental documents.
Code of Federal Regulations, 2011 CFR
2011-07-01
... significant impact on, official local or regional zoning or comprehensive land use plans; and, (xiii...) Environmental Impact Statements. The head of each VA element shall include a detailed written statement “in... Regulations, 40 CFR part 1502. An environmental impact statement shall be prepared in accordance with the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-18
... National Historic Trail Feasibility Study/Abbreviated Final Environmental Impact Statement, National Trails... Decision on the Abbreviated Final Environmental Impact Statement for the Long Walk National Historic Trail... Final Environmental Impact Statement for the Long Walk National Historic Trail Feasibility Study...
77 FR 59703 - Environmental Impact Statement; Taos Regional Airport, Taos, NM
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-28
... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration Environmental Impact Statement; Taos...'' Environmental Impact Statement (EIS). The Town of Taos, owner and operator of Taos Regional Airport located in Taos, New Mexico, has requested the FAA to approve revisions to its Airport Layout Plan (ALP) to...
18 CFR 380.6 - Actions that require an environmental impact statement.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Federal action significantly affecting the quality of the human environment, an environmental assessment... environmental assessment, an environmental impact statement may or may not be prepared. (c) An environmental impact statement will not be required if an environmental assessment indicates that a proposal has...
10 CFR 1021.313 - Public review of environmental impact statements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false Public review of environmental impact statements. 1021.313 Section 1021.313 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NATIONAL ENVIRONMENTAL POLICY ACT IMPLEMENTING PROCEDURES Implementing Procedures § 1021.313 Public review of environmental impact statements. (a...
77 FR 1973 - Environmental Impact Statement: In the Vicinity of the City and Borough of Juneau, AK
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-12
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Environmental Impact Statement: In the..., in cooperation with DOT&PF, will prepare a supplemental environmental impact statement (SEIS) for... Lynn Canal corridor. FOR FURTHER INFORMATION CONTACT: Mr. Tim Haugh, Environmental Program Manager...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-14
...] Supplemental Environmental Impact Statement for Replacement of NOAA National Marine Fisheries Service Southwest... and Atmospheric Administration (NOAA), Commerce. ACTION: Notice of intent to prepare a Supplemental Environmental Impact Statement (SEIS); request for comments. SUMMARY: NOAA announces its intention to prepare an...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-05
... Environmental Impact Statement for the Lost Creek In-Situ Recovery Project in Sweetwater County, WY; Supplement to the Generic Environmental Impact Statement for In-Situ Leach Uranium Milling Facilities AGENCY... SEIS) for the Lost Creek [[Page 6069
Code of Federal Regulations, 2010 CFR
2010-10-01
... information for determining whether to prepare an Environmental Impact Statement or to make a finding of no... Statement or an Environmental Assessment. (f) Environmental Impact Statement or “EIS” means the detailed written statement required by the National Environmental Policy Act, 42 U.S.C. 4332(2)(c), for a major...
Code of Federal Regulations, 2010 CFR
2010-07-01
... independent audit is intended to ascertain the adequacy of the recipient's internal financial management... of the recipient's financial statements. However, it may be more economical in some cases to have the...; and (2) When requesting an additional audit, shall: (i) Limit the scope of such additional audit to...
Code of Federal Regulations, 2011 CFR
2011-07-01
... independent audit is intended to ascertain the adequacy of the recipient's internal financial management... of the recipient's financial statements. However, it may be more economical in some cases to have the...; and (2) When requesting an additional audit, shall: (i) Limit the scope of such additional audit to...
10 CFR 603.1010 - Substantive issues.
Code of Federal Regulations, 2011 CFR
2011-01-01
.... The scope is an overall vision statement for the project, including a discussion of the project's... minimum required Federal Government rights in intellectual property generated under the award and address... disposition of tangible property. The property provisions for for-profit and nonprofit participants must be in...
Code of Federal Regulations, 2010 CFR
2010-04-01
...) The following are citations to regulations within the scope of this section. (1) Acceptance of Gifts... Procurement. 41 CFR part 6-1 et seq. (c) These regulations are supplemented from time to time by amendments...
29 CFR 453.10 - The statutory provision.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Regulations Relating to Labor OFFICE OF LABOR-MANAGEMENT STANDARDS, DEPARTMENT OF LABOR LABOR-MANAGEMENT STANDARDS GENERAL STATEMENT CONCERNING THE BONDING REQUIREMENTS OF THE LABOR-MANAGEMENT REPORTING AND DISCLOSURE ACT OF 1959 Scope of the Bond § 453.10 The statutory provision. The statute requires that every...
29 CFR 453.10 - The statutory provision.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Regulations Relating to Labor OFFICE OF LABOR-MANAGEMENT STANDARDS, DEPARTMENT OF LABOR LABOR-MANAGEMENT STANDARDS GENERAL STATEMENT CONCERNING THE BONDING REQUIREMENTS OF THE LABOR-MANAGEMENT REPORTING AND DISCLOSURE ACT OF 1959 Scope of the Bond § 453.10 The statutory provision. The statute requires that every...
29 CFR 452.137 - Effective dates.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Relating to Labor OFFICE OF LABOR-MANAGEMENT STANDARDS, DEPARTMENT OF LABOR LABOR-MANAGEMENT STANDARDS GENERAL STATEMENT CONCERNING THE ELECTION PROVISIONS OF THE LABOR-MANAGEMENT REPORTING AND DISCLOSURE ACT OF 1959 Dates and Scope of Application § 452.137 Effective dates. (a) Section 404 states when the...
29 CFR 452.137 - Effective dates.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Relating to Labor OFFICE OF LABOR-MANAGEMENT STANDARDS, DEPARTMENT OF LABOR LABOR-MANAGEMENT STANDARDS GENERAL STATEMENT CONCERNING THE ELECTION PROVISIONS OF THE LABOR-MANAGEMENT REPORTING AND DISCLOSURE ACT OF 1959 Dates and Scope of Application § 452.137 Effective dates. (a) Section 404 states when the...
29 CFR 453.10 - The statutory provision.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Regulations Relating to Labor OFFICE OF LABOR-MANAGEMENT STANDARDS, DEPARTMENT OF LABOR LABOR-MANAGEMENT STANDARDS GENERAL STATEMENT CONCERNING THE BONDING REQUIREMENTS OF THE LABOR-MANAGEMENT REPORTING AND DISCLOSURE ACT OF 1959 Scope of the Bond § 453.10 The statutory provision. The statute requires that every...
29 CFR 452.137 - Effective dates.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Relating to Labor OFFICE OF LABOR-MANAGEMENT STANDARDS, DEPARTMENT OF LABOR LABOR-MANAGEMENT STANDARDS GENERAL STATEMENT CONCERNING THE ELECTION PROVISIONS OF THE LABOR-MANAGEMENT REPORTING AND DISCLOSURE ACT OF 1959 Dates and Scope of Application § 452.137 Effective dates. (a) Section 404 states when the...
29 CFR 453.10 - The statutory provision.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Regulations Relating to Labor OFFICE OF LABOR-MANAGEMENT STANDARDS, DEPARTMENT OF LABOR LABOR-MANAGEMENT STANDARDS GENERAL STATEMENT CONCERNING THE BONDING REQUIREMENTS OF THE LABOR-MANAGEMENT REPORTING AND DISCLOSURE ACT OF 1959 Scope of the Bond § 453.10 The statutory provision. The statute requires that every...
29 CFR 452.137 - Effective dates.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Relating to Labor OFFICE OF LABOR-MANAGEMENT STANDARDS, DEPARTMENT OF LABOR LABOR-MANAGEMENT STANDARDS GENERAL STATEMENT CONCERNING THE ELECTION PROVISIONS OF THE LABOR-MANAGEMENT REPORTING AND DISCLOSURE ACT OF 1959 Dates and Scope of Application § 452.137 Effective dates. (a) Section 404 states when the...
29 CFR 452.137 - Effective dates.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Relating to Labor OFFICE OF LABOR-MANAGEMENT STANDARDS, DEPARTMENT OF LABOR LABOR-MANAGEMENT STANDARDS GENERAL STATEMENT CONCERNING THE ELECTION PROVISIONS OF THE LABOR-MANAGEMENT REPORTING AND DISCLOSURE ACT OF 1959 Dates and Scope of Application § 452.137 Effective dates. (a) Section 404 states when the...
29 CFR 453.10 - The statutory provision.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Regulations Relating to Labor OFFICE OF LABOR-MANAGEMENT STANDARDS, DEPARTMENT OF LABOR LABOR-MANAGEMENT STANDARDS GENERAL STATEMENT CONCERNING THE BONDING REQUIREMENTS OF THE LABOR-MANAGEMENT REPORTING AND DISCLOSURE ACT OF 1959 Scope of the Bond § 453.10 The statutory provision. The statute requires that every...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-06
... to prepare an environmental impact statement. SUMMARY: The Ashley National Forest in cooperation with... analysis must be received by August 5, 2010. The draft environmental impact statement is expected February 2011 and the final environmental impact statement is expected June 2011. ADDRESSES: Send written...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-22
... Management Plan/Environmental Impact Statement, Ross Lake National Recreation Area, North Cascades National... Impact Statement for the new General Management Plan (GMP) for Ross Lake National Recreation Area, part... Wilderness Act of 1988. The full range of foreseeable environmental consequences from implementing the...
38 CFR Appendix C to Part 200 - Actions Requiring Environmental Impact Statement
Code of Federal Regulations, 2011 CFR
2011-07-01
... Environmental Impact Statement C Appendix C to Part 200 Pensions, Bonuses, and Veterans' Relief ARMED FORCES...—Actions Requiring Environmental Impact Statement The following actions are considered to be major Federal actions significantly affecting the quality of the human environment, and therefore must be the subjects...
38 CFR Appendix C to Part 200 - Actions Requiring Environmental Impact Statement
Code of Federal Regulations, 2010 CFR
2010-07-01
... Environmental Impact Statement C Appendix C to Part 200 Pensions, Bonuses, and Veterans' Relief ARMED FORCES...—Actions Requiring Environmental Impact Statement The following actions are considered to be major Federal actions significantly affecting the quality of the human environment, and therefore must be the subjects...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
... DEPARTMENT OF ENERGY Western Area Power Administration Notice of Cancellation of Environmental Impact Statement for the Interconnection of the Hualapai Valley Solar Project, Mohave County, AZ (DOE/EIS... Impact Statement. SUMMARY: The U.S. Department of Energy (DOE), Western Area Power Administration...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-19
... Draft Feasibility Study; Environmental Impact Statement for the Chatfield Reservoir Storage Reallocation.... Army Corps of Engineers has prepared a Draft Feasibility Report/Environmental Impact Statement (FR/EIS) for the Chatfield Reservoir Storage Reallocation Study, Littleton, Colorado and by this notice is...
43 CFR 3420.3-1 - Area identification process.
Code of Federal Regulations, 2013 CFR
2013-10-01
... combinations to be analyzed in the regional lease sale environmental impact statement; (3) Guide the preparation of the regional lease sale environmental impact statement; and (4) Recommend a regional coal lease... coal lease sale environmental impact statement (see § 3420.3-4(c)); and (4) The regional coal team...
43 CFR 3420.3-1 - Area identification process.
Code of Federal Regulations, 2014 CFR
2014-10-01
... combinations to be analyzed in the regional lease sale environmental impact statement; (3) Guide the preparation of the regional lease sale environmental impact statement; and (4) Recommend a regional coal lease... coal lease sale environmental impact statement (see § 3420.3-4(c)); and (4) The regional coal team...
43 CFR 3420.3-1 - Area identification process.
Code of Federal Regulations, 2012 CFR
2012-10-01
... combinations to be analyzed in the regional lease sale environmental impact statement; (3) Guide the preparation of the regional lease sale environmental impact statement; and (4) Recommend a regional coal lease... coal lease sale environmental impact statement (see § 3420.3-4(c)); and (4) The regional coal team...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-15
... to Prepare a Tiered Environmental Impact Statement AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice to Rescind a Notice of Intent to Prepare a Tiered Environmental Impact Statement. SUMMARY... Heitmann, Environmental Specialist, Federal Highway Administration, New Mexico Division Office, 4001 Office...