State Implementation Plan (SIP) Checklist Guide
Guidance documents and examples to assist air quality agencies of non-attainment areas in developing plans to implement national ambient air quality standards (NAAQS), including the ground-level ozone standard.
Matrix evaluation of science objectives
NASA Technical Reports Server (NTRS)
Wessen, Randii R.
1994-01-01
The most fundamental objective of all robotic planetary spacecraft is to return science data. To accomplish this, a spacecraft is fabricated and built, software is planned and coded, and a ground system is designed and implemented. However, the quantitative analysis required to determine how the collection of science data drives ground system capabilities has received very little attention. This paper defines a process by which science objectives can be quantitatively evaluated. By applying it to the Cassini Mission to Saturn, this paper further illustrates the power of this technique. The results show which science objectives drive specific ground system capabilities. In addition, this process can assist system engineers and scientists in the selection of the science payload during pre-project mission planning; ground system designers during ground system development and implementation; and operations personnel during mission operations.
Implementing corporate wellness programs: a business approach to program planning.
Helmer, D C; Dunn, L M; Eaton, K; Macedonio, C; Lubritz, L
1995-11-01
1. Support of key decision makers is critical to the successful implementation of a corporate wellness program. Therefore, the program implementation plan must be communicated in a format and language readily understood by business people. 2. A business approach to corporate wellness program planning provides a standardized way to communicate the implementation plan. 3. A business approach incorporates the program planning components in a format that ranges from general to specific. This approach allows for flexibility and responsiveness to changes in program planning. 4. Components of the business approach are the executive summary, purpose, background, ground rules, approach, requirements, scope of work, schedule, and financials.
NASA Technical Reports Server (NTRS)
Kirkpatrick, Paul D.; Williams, Jeffrey G.; Condzella, Bill R.
2008-01-01
A rigorous set of detailed ground safety requirements is required to make sure that ground support equipment (GSE) and associated planned ground operations are conducted safely. Detailed ground safety requirements supplement the GSE requirements already called out in NASA-STD-5005. This paper will describe the initial genesis of these ground safety requirements, the establishment and approval process and finally the implementation process for Project Orion. The future of the requirements will also be described. Problems and issues encountered and overcame will be discussed.
Toward implementation of a national ground water monitoring network
Schreiber, Robert P.; Cunningham, William L.; Copeland, Rick; Frederick, Kevin D.
2008-01-01
The Federal Advisory Committee on Water Information's (ACWI) Subcommittee on Ground Water (SOGW) has been working steadily to develop and encourage implementation of a nationwide, long-term ground-water quantity and quality monitoring framework. Significant progress includes the planned submission this fall of a draft framework document to the full committee. The document will include recommendations for implementation of the network and continued acknowledgment at the federal and state level of ACWI's potential role in national monitoring toward an improved assessment of the nation's water reserves. The SOGW mission includes addressing several issues regarding network design, as well as developing plans for concept testing, evaluation of costs and benefits, and encouraging the movement from pilot-test results to full-scale implementation within a reasonable time period. With the recent attention to water resource sustainability driven by severe droughts, concerns over global warming effects, and persistent water supply problems, the SOGW mission is now even more critical.
The Telecommunications and Data Acquisition Report
NASA Technical Reports Server (NTRS)
Posner, E. C. (Editor)
1991-01-01
This quarterly reports on space communications, radio navigation, radio science, and ground based radio and radar astronomy in connection with the Deep Space Network (DSN) in planning, supporting research and technology, implementation, and in operations. Also included is standards activity at JPL for space data and information systems and DSN work. Specific areas of research are: Tracking and ground based navigation; Spacecraft and ground communications; Station control and system technology; DSN Systems Implementation; and DSN Operations.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-24
...] Implementation of the 2008 National Ambient Air Quality Standards for Ozone: State Implementation Plan... Rule Regarding ``Implementation of the 2008 National Ambient Air Quality Standards for Ozone: State... ground-level ozone formation. B. What should I consider as I prepare my comments for the EPA? 1...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pace, Brenda Ringe; Gilbert, Hollie Kae
2015-05-01
This plan addresses cultural resource protection procedures to be implemented during construction of the Remote Handled Low Level Waste project at the Idaho National Laboratory. The plan proposes pre-construction review of proposed ground disturbing activities to confirm avoidance of cultural resources. Depending on the final project footprint, cultural resource protection strategies might also include additional survey, protective fencing, cultural resource mapping and relocation of surface artifacts, collection of surface artifacts for permanent curation, confirmation of undisturbed historic canal segments outside the area of potential effects for construction, and/or archaeological test excavations to assess potential subsurface cultural deposits at known culturalmore » resource locations. Additionally, all initial ground disturbing activities will be monitored for subsurface cultural resource finds, cultural resource sensitivity training will be conducted for all construction field personnel, and a stop work procedure will be implemented to guide assessment and protection of any unanticipated discoveries after initial monitoring of ground disturbance.« less
7 CFR 272.2 - Plan of operation.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 60 days prior to implementation. Minor changes to approved sampling plans shall be submitted at least... Plan of Operation. The State and FNS (USDA) further agree to fully comply with any changes in Federal... effect that, no person in the United States shall, on the grounds of sex, race, color, age, political...
7 CFR 272.2 - Plan of operation.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 60 days prior to implementation. Minor changes to approved sampling plans shall be submitted at least... Plan of Operation. The State and FNS (USDA) further agree to fully comply with any changes in Federal... effect that, no person in the United States shall, on the grounds of sex, race, color, age, political...
7 CFR 272.2 - Plan of operation.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 60 days prior to implementation. Minor changes to approved sampling plans shall be submitted at least... Plan of Operation. The State and FNS (USDA) further agree to fully comply with any changes in Federal... effect that, no person in the United States shall, on the grounds of sex, race, color, age, political...
Advanced planning for ISS payload ground processing
NASA Astrophysics Data System (ADS)
Page, Kimberly A.
2000-01-01
Ground processing at John F. Kennedy Space Center (KSC) is the concluding phase of the payload/flight hardware development process and is the final opportunity to ensure safe and successful recognition of mission objectives. Planning for the ground processing of on-orbit flight hardware elements and payloads for the International Space Station is a responsibility taken seriously at KSC. Realizing that entering into this operational environment can be an enormous undertaking for a payload customer, KSC continually works to improve this process by instituting new/improved services for payload developer/owner, applying state-of-the-art technologies to the advanced planning process, and incorporating lessons learned for payload ground processing planning to ensure complete customer satisfaction. This paper will present an overview of the KSC advanced planning activities for ISS hardware/payload ground processing. It will focus on when and how KSC begins to interact with the payload developer/owner, how that interaction changes (and grows) throughout the planning process, and how KSC ensures that advanced planning is successfully implemented at the launch site. It will also briefly consider the type of advance planning conducted by the launch site that is transparent to the payload user but essential to the successful processing of the payload (i.e. resource allocation, executing documentation, etc.) .
1990-02-13
Freedom GPS Implementation Plans - An Overview, Penny E. Saunders . . . . . .................. 95 Recent Results In High-Precision GPS Orbit Determination...Upperstages" 7. Penny Saunders (NASA Johnson Space Center): "Space Station GPS Implementation Plans and Overview" 12:00 - 13:30 LUNCH NCO Club vii 13...and design. In this phase we plan to do a ground demon- stration to determine experimentally what sort of attitude accuracy we can get from this
Reverse technology transfer; obtaining feedback from managers.
A.B. Carey; J.M. Calhoun; B. Dick; K. O' Halloran; L.S. Young; R.E. Bigley; S. Chan; C.A. Harrington; J.P. Hayes; J. Marzluff
1999-01-01
Forestry policy, planning, and practice have changed rapidly with implementation of ecosystem management by federal, state, tribal, and private organizations. Implementation entails new concepts, terminology, and management approaches. Yet there seems to have been little organized effort to obtain feedback from on-the-ground managers on the practicality of implementing...
14 CFR 417.111 - Launch plans.
Code of Federal Regulations, 2010 CFR
2010-01-01
... controls identified by a launch operator's ground safety analysis and implementation of the ground safety.... (ii) For each toxic propellant, any hazard controls and process constraints determined under the... classification and compatibility group as defined by part 420 of this chapter. (3) A graphic depiction of the...
DOT National Transportation Integrated Search
2006-04-26
STATEMENT OF NEED: The effectiveness of ground mounted diagrammatic signs in the context of urban multi-lane arterials leading to a : freeway are to be evaluated. This type of guide sign provides much needed information well in advance of the : inter...
The Telecommunications and Data Acquisition Report
NASA Technical Reports Server (NTRS)
Posner, E. C. (Editor)
1983-01-01
Developments in programs in telecommunication and data acquisition in space communications, radio navigation, radio science, and ground based radio astronomy are reported. Activities of the deep space network (DSN) and its associated ground communication facility (GCF) in planning, supporting research and technology, implementation, and in operations are outlined. The publication of reports on the application of radio interferometry at microwave frequencies for geodynamic measurements are presented. Implementation and operation for searching the microwave spectrum is reported.
DOT National Transportation Integrated Search
2002-05-01
A two part laboratory experimental program was conducted to evaluate strength and durability of various concrete : mix designs. In Part I of the study, the influence of using Grade 120 ground granulated blast furnace slag (GGBFS) : on the strength an...
ERP Software Implementation Best Practices.
ERIC Educational Resources Information Center
Frantz, Pollyanne S.; Southerland, Arthur R.; Johnson, James T.
2002-01-01
Studied the perceptions of chief financial and information officers of enterprise resource planning (ERP) software implementation best practices. Usable responses from 159 respondents show consensus for the most part between the perceptions of the two groups and describe some best practices that represent common ground. (SLD)
Revised ground-water monitoring compliance plan for the 300 area process trenches
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schalla, R.; Aaberg, R.L.; Bates, D.J.
1988-09-01
This document contains ground-water monitoring plans for process-water disposal trenches located on the Hanford Site. These trenches, designated the 300 Area Process Trenches, have been used since 1973 for disposal of water that contains small quantities of both chemicals and radionuclides. The ground-water monitoring plans contained herein represent revision and expansion of an effort initiated in June 1985. At that time, a facility-specific monitoring program was implemented at the 300 Area Process Trenches as part of a regulatory compliance effort for hazardous chemicals being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements formore » interim-status facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The applicable monitoring requirements are described in the Resource Conservation and Recovery Act (RCRA), 40 CFR 265.90 of the federal regulations, and in WAC 173-303-400 of Washington State's regulations (Washington State Department of Ecology 1986). The program implemented for the process trenches was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. The plans for the program, contained in a document prepared by the US Department of Energy (USDOE) in 1985, called for monthly sampling of 14 of the 37 existing monitoring wells at the 300 Area plus the installation and sampling of 2 new wells. 27 refs., 25 figs., 15 tabs.« less
The Telecommunications and Data Acquisition Report
NASA Technical Reports Server (NTRS)
Posner, E. C. (Editor)
1983-01-01
This publication reports on developments in programs managed by JPL's office of Telecommunications and Data Acquisition (TDA). In space communications, radio navigation, radio science, and ground based radio astronomy, it reports on activities of the Deep Space Network (DSN) and its associated Ground Communications Facility (GCF) in planning, in supporting research and technology, in implementation and in operations. In geodynamics, the publication reports on the application of radio interferometry at microwave frequencies for geodynamic measurements. This publication also reports on implementation and operations for searching the microwave spectrum.
Ozone Control Strategies | Ground-level Ozone | New ...
2017-09-05
The Air Quality Planning Unit's primary goal is to protect your right to breathe clean air. Guided by the Clean Air Act, we work collaboratively with states, communities, and businesses to develop and implement strategies to reduce air pollution from a variety of sources that contribute to the ground-level ozone or smog problem.
The Telecommunications and Data Acquisition Report
NASA Technical Reports Server (NTRS)
Posner, E. C. (Editor)
1989-01-01
Developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA) are provided. Activities of the Deep Space Network and its associated Ground Communications Facility in planning, in supporting research and technology, in implementation, and in operations are reported in space communications, radio navigation, radio science, and ground-based radio and radar astronomy.
7 CFR 272.2 - Plan of operation.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 60 days prior to implementation. Minor changes to approved sampling plans shall be submitted at least...) further agree to fully comply with any changes in Federal law and regulations. This agreement may be... the United States shall, on the grounds of sex, race, color, age, political belief, religion, handicap...
The Telecommunications and Data Acquisition Report
NASA Technical Reports Server (NTRS)
Posner, E. C. (Editor)
1983-01-01
Archival reports on developments in programs managed by JPL's office of Telecommunications and Data Acquisition (TDA) are presented. In space communications, radio navigation, radio science, and ground-based radio astronomy, it reports on activities of the Deep Space Network (DSN) and its associated Ground Communications Facility (GCF) in planning, in supporting research and technology, in implementation, and in operations.
Tiered on-the-ground implementation projects for Gulf of Mexico water quality improvements
USDA-ARS?s Scientific Manuscript database
Both the Gulf Hypoxia Action Plan for Reducing, Mitigating, and Controlling Hypoxia in the Northern Gulf of Mexico and Improving Water Quality in the Mississippi River Basin (USEPA 2008) and the GOMA Governors’ Action Plan II for Healthy and Resilient Coasts (GOMA 2009) call for the development and ...
The Telecommunications and Data Acquisition Report
NASA Technical Reports Server (NTRS)
Posner, E. C. (Editor)
1987-01-01
Archival reports on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA) are provided. Activities of the Deep Space Network (DSN) in space communications, radio navigation, radio science, and ground-based radio astronomy are reported. Also included are the plans, supporting research and technology, implementation and operations for the Ground Communications Facility (GCF). In geodynamics, the publication reports on the application of radio interferometry at microwave frequencies for geodynamic measurements. In the search for extraterrestrial intelligence (SETI), it reports on implementation and operations for searching the microwave spectrum.
NASA's Autonomous Formation Flying Technology Demonstration, Earth Observing-1(EO-1)
NASA Technical Reports Server (NTRS)
Folta, David; Bristow, John; Hawkins, Albin; Dell, Greg
2002-01-01
NASA's first autonomous formation flying mission, the New Millennium Program's (NMP) Earth Observing-1 (EO-1) spacecraft, recently completed its principal goal of demonstrating advanced formation control technology. This paper provides an overview of the evolution of an onboard system that was developed originally as a ground mission planning and operations tool. We discuss the Goddard Space Flight Center s formation flying algorithm, the onboard flight design and its implementation, the interface and functionality of the onboard system, and the implementation of a Kalman filter based GPS data smoother. A number of safeguards that allow the incremental phasing in of autonomy and alleviate the potential for mission-impacting anomalies from the on- board autonomous system are discussed. A comparison of the maneuvers planned onboard using the EO-1 autonomous control system to those from the operational ground-based maneuver planning system is presented to quantify our success. The maneuvers discussed encompass reactionary and routine formation maintenance. Definitive orbital data is presented that verifies all formation flying requirements.
Inverter Ground Fault Overvoltage Testing
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoke, Andy; Nelson, Austin; Chakraborty, Sudipta
This report describes testing conducted at NREL to determine the duration and magnitude of transient overvoltages created by several commercial PV inverters during ground fault conditions. For this work, a test plan developed by the Forum on Inverter Grid Integration Issues (FIGII) has been implemented in a custom test setup at NREL. Load rejection overvoltage test results were reported previously in a separate technical report.
NASA Technical Reports Server (NTRS)
Bedrax-Weiss, Tania; Jonsson, Ari K.; Frank, Jeremy D.; McGann, Conor
2003-01-01
Generating plans for execution imposes a different set of requirements on the planning process than those imposed by planning alone. In highly unpredictable execution environments, a fully-grounded plan may become inconsistent frequently when the world fails to behave as expected. Intelligent execution permits making decisions when the most up-to-date information is available, ensuring fewer failures. Planning should acknowledge the capabilities of the execution system, both to ensure robust execution in the face of uncertainty, which also relieves the planner of the burden of making premature commitments. We present Plan Identification Functions (PIFs), which formalize what it means for a plan to be executable, md are used in conjunction with a complete model of system behavior to halt the planning process when an executable plan is found. We describe the implementation of plan identification functions for a temporal, constraint-based planner. This particular implementation allows the description of many different plan identification functions. characteristics crf the xectieonfvii rnm-enft,h e best plan to hand to the execution system will contain more or less commitment and information.
Implementing the Executive Order: HHS Takes Lead in Developing Comprehensive Plan.
ERIC Educational Resources Information Center
Ambler, Marjane
1999-01-01
Describes the Department of Health and Human Services' (HHS) efforts to develop a comprehensive five-year plan that will change the way all HHS agencies deal with tribal colleges. Summarizes the conference held in Phoenix in January 1998 that brought tribal college presidents and departmental officials together to find common ground for developing…
Summary appraisals of the Nation's ground-water resources; Great Basin region
Eakin, Thomas E.; Price, Don; Harrill, J.R.
1976-01-01
Only a few areas of the Great Basin Region have been studied in detail sufficient to enable adequate design of an areawide groundwater development. These areas already have been developed. As of 1973 data for broadly outlining the ground-water resources of the region had been obtained. However, if large-scale planned development is to become a reality, a program for obtaining adequate hydrologic and related data would be a prerequisite. Ideally, the data should be obtained in time to be available for the successively more intensive levels of planning required to implement developments.
ERIC Educational Resources Information Center
Iyengar, Radhika; Surianarain, Sharmi
2010-01-01
There exist many actors within the realm of education policy planning and implementation, namely: the policy makers; the national, local and regional institutions engaged in the dissemination and interpretation of these policies; and the educational institutions that implement these policies at the ground level (schools). While schools are largely…
NASA Technical Reports Server (NTRS)
Loomis, Audrey; Kellner, Albrecht
1988-01-01
The Columbus Project is the European Space Agency's contribution to the International Space Station program. Columbus is planned to consist of three elements (a laboratory module attached to the Space Station base, a man-tended freeflyer orbiting with the Space Station base, and a platform in polar orbit). System definition and requirements analysis for Columbus are underway, scheduled for completion in mid-1990. An overview of the Columbus mission planning environment and operations concept as currently defined is given, and some of the challenges presented to software maintainers and ground segment personnel during mission operators are identified. The use of advanced technologies in system implementation is being explored. Both advantages of such solutions and potential problems they present are discussed, and the next steps to be taken by Columbus before targeting any functions for advanced technology implementation are summarized. Several functions in the mission planning process were identified as candidates for advanced technology implementation. These range from expert interaction with Columbus' data bases through activity scheduling and near-real-time response to departures from the planned timeline. Each function is described, and its potential for advanced technology implementation briefly assessed.
The Telecommunications and Data Acquisition Report
NASA Technical Reports Server (NTRS)
Posner, E. C. (Editor)
1992-01-01
Archival reports on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA) are provided. In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DSN) in planning, in supporting research and technology, in implementation, and in operations. Also included is standards activity at JPL for space data and information. In the search for extraterrestrial intelligence (SETI), the TDA Progress Report reports on implementation and operations for searching the microwave spectrum. Topics covered include tracking and ground-based navigation; communications, spacecraft-ground; station control and system technology; capabilities for new projects; network upgrade and sustaining; network operations and operations support; and TDA program management and analysis.
The Telecommunications and Data Acquisition Report. [Deep Space Network
NASA Technical Reports Server (NTRS)
Posner, E. C. (Editor)
1988-01-01
In space communications, radio navigation, radio science, and ground based radio and radar astronomy, activities of the Deep Space Network and its associated Ground Communications Facility in planning, in supporting research and technology, in implementation, and in operations are reported. Also included is TDA funded activity at JPL on data and information systems and reimbursable DSN work performed for other space agencies through NASA.
Science-based Forest Management in an Era of Climate Change
NASA Astrophysics Data System (ADS)
Swanston, C.; Janowiak, M.; Brandt, L.; Butler, P.; Handler, S.; Shannon, D.
2014-12-01
Recognizing the need to provide climate adaptation information, training, and tools to forest managers, the Forest Service joined with partners in 2009 to launch a comprehensive effort called the Climate Change Response Framework (www.forestadaptation.org). The Framework provides a structured approach to help managers integrate climate considerations into forest management plans and then implement adaptation actions on the ground. A planning tool, the Adaptation Workbook, is used in conjunction with vulnerability assessments and a diverse "menu" of adaptation approaches to generate site-specific adaptation actions that meet explicit management objectives. Additionally, a training course, designed around the Adaptation Workbook, leads management organizations through this process of designing on-the-ground adaptation tactics for their management projects. The Framework is now being actively pursued in 20 states in the Northwoods, Central Hardwoods, Central Appalachians, Mid-Atlantic, and New England. The Framework community includes over 100 science and management groups, dozens of whom have worked together to complete six ecoregional vulnerability assessments covering nearly 135 million acres. More than 75 forest and urban forest adaptation strategies and approaches were synthesized from peer-reviewed and gray literature, expert solicitation, and on-the-ground adaptation projects. These are being linked through the Adaptation Workbook process to on-the-ground adaptation tactics being planned and employed in more than 50 adaptation "demonstrations". This presentation will touch on the scientific and professional basis of the vulnerability assessments, and showcase efforts where adaptation actions are currently being implemented in forests.
Assessing high reliability practices in the wildland fire community
Anne E. Black; Kathleen Sutcliffe; Michelle Barton; Deirdre Dether
2008-01-01
The Office of Inspector General's 2006 audit of Forest Service fire management operations added yet another voice to the growing chorus calling on the Federal wildland fire community to get more fire on the ground (OIG 2006). The 1995 National Fire Plan and the 2001 Implementation Plan identify the critical role of wildland fire use in reducing hazardous fuels...
Advanced Ground Systems Maintenance Prognostics Project
NASA Technical Reports Server (NTRS)
Perotti, Jose M.
2015-01-01
The project implements prognostics capabilities to predict when a component system or subsystem will no longer meet desired functional or performance criteria, called the end of life. The capability also provides an assessment of the remaining useful life of a hardware component. The project enables the delivery of system health advisories to ground system operators. This project will use modeling techniques and algorithms to assess components' health andpredict remaining life for such components. The prognostics capability being developed will beused:during the design phase and during pre/post operations to conduct planning and analysis ofsystem design, maintenance & logistics plans, and system/mission operations plansduring real-time operations to monitor changes to components' health and assess their impacton operations.This capability will be interfaced to Ground Operations' command and control system as a part ofthe AGSM project to help assure system availability and mission success. The initial modelingeffort for this capability will be developed for Liquid Oxygen ground loading applications.
Making habitat connectivity a reality.
Keeley, Annika T H; Basson, Galli; Cameron, D Richard; Heller, Nicole E; Huber, Patrick R; Schloss, Carrie A; Thorne, James H; Merenlender, Adina M
2018-06-19
For over 40 years, habitat corridors have been a solution for sustaining wildlife in fragmented landscapes, and now are often suggested as a climate adaptation strategy. However, while a plethora of connectivity plans exist, protecting and restoring habitat connectivity through on-the-ground action has been slow. We identified implementation challenges and opportunities through a literature review of project implementation, a science-practice workshop, and interviews with conservation professionals. Our research indicates that connectivity challenges and solutions tend to be context-specific, dependent on land ownership patterns, socioeconomic factors, and the policy framework. We found evidence that developing and promoting a common vision shared by a diverse set of stakeholders including nontraditional conservation actors, such as water districts and recreation departments, and through communication among and between partners and the public is key to successful implementation. Other factors that lead to successful implementation include undertaking empirical studies to prioritize and validate corridors and the identification of related co-benefits of corridor projects. Engaging partners involved in land management and planning, such as non-governmental conservation organizations, public agencies, and private landowners is critical to effective strategy implementation. A clear regulatory framework including unambiguous connectivity conservation mandates would increase public resource allocation, and incentive programs are needed to promote private sector engagement. We argue that connectivity conservation must more rapidly move from planning to implementation and provide an evidence-based solution made up of key elements for successful on-the-ground connectivity implementation. The components of this new framework constitute the social processes necessary to advance habitat connectivity for biodiversity conservation and resilient landscapes under climate change. Three case studies serve to illustrate the application of the framework. This article is protected by copyright. All rights reserved. This article is protected by copyright. All rights reserved.
ERIC Educational Resources Information Center
Bresciani, Marilee J.
2011-01-01
The purpose of this study was to explore the manner in which a community college district planned to implement a systematic outcomes-based assessment program review process in order to have results inform institutional, district, and state policy discussions. Data derived from this grounded theory study indicated that there was not a shared…
Global Precipitation Measurement (GPM) Ground Validation (GV) Science Implementation Plan
NASA Technical Reports Server (NTRS)
Petersen, Walter A.; Hou, Arthur Y.
2008-01-01
For pre-launch algorithm development and post-launch product evaluation Global Precipitation Measurement (GPM) Ground Validation (GV) goes beyond direct comparisons of surface rain rates between ground and satellite measurements to provide the means for improving retrieval algorithms and model applications.Three approaches to GPM GV include direct statistical validation (at the surface), precipitation physics validation (in a vertical columns), and integrated science validation (4-dimensional). These three approaches support five themes: core satellite error characterization; constellation satellites validation; development of physical models of snow, cloud water, and mixed phase; development of cloud-resolving model (CRM) and land-surface models to bridge observations and algorithms; and, development of coupled CRM-land surface modeling for basin-scale water budget studies and natural hazard prediction. This presentation describes the implementation of these approaches.
NASA Technical Reports Server (NTRS)
1991-01-01
This document presents the solar electric propulsion (SEP) concept design developed as part of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study. The evolution of the SEP concept is described along with the requirements, guidelines and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities, and costs.
NASA Technical Reports Server (NTRS)
1991-01-01
The cryogenic/aerobrake (CAB) and the cryogenic all-propulsive (CAP) concept designs developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study are presented. The evolution of the CAB and CAP concepts is described along with the requirements, guidelines and assumptions for the designs. Operating modes and options are defined and systems descriptions of the vehicles are presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities, and costs.
NASA Technical Reports Server (NTRS)
1991-01-01
The nuclear electric propulsion (NEP) concept design developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study is presented. The evolution of the NEP concept is described along with the requirements, guidelines, and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities and costs.
NASA Technical Reports Server (NTRS)
1991-01-01
This document presents the nuclear thermal rocket (NTR) concept design developed in support of the Space Transfer Concepts and Analysis for Exploration Missions (STCAEM) study. The evolution of the NTR concept is described along with the requirements, guidelines and assumptions for the design. Operating modes and options are defined and a systems description of the vehicle is presented. Artificial gravity configuration options and space and ground support systems are discussed. Finally, an implementation plan is presented which addresses technology needs, schedules, facilities and costs.
Towards a Community-Based Dementia Care Strategy: A Perspective from Quebec.
Godard-Sebillotte, Claire; Vedel, Isabelle; Bergman, Howard
Morton-Chang et al. highlighted in their article the key strategic pillars of a community-based dementia care strategy: put "people first," support informal caregiving and enable "ground up" innovation and change. In our commentary, we draw upon our experience as authors of the Quebec Alzheimer Plan and evaluators of its implementation by the Quebec Ministry of Health and Social Services (MSSS). To us, a sustainable dementia care strategy entails a patient-centred approach, grounded in primary care, caring for persons with dementia at every stage of the disease. Implementation of such a strategy requires an ongoing effort to allow innovation adoption by clinicians and organizations.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-31
... deposited on the ground and in the water, changing nutrient and chemical balances. IV. What comments were...). TSP is particulate up to 100 micrometers in diameter. Then in 1987, EPA changed the indicator to...
The effect of voice communications latency in high density, communications-intensive airspace.
DOT National Transportation Integrated Search
2003-01-01
The Federal Aviation Administration (FAA) Next Generation Air-Ground Communications program plans to replace aging analog radio equipment with the Very High Frequency Digital Link Mode 3 (VDL3) system. VDL3 will implement both digital voice and data ...
DOT National Transportation Integrated Search
2005-07-05
The Oregon Department of Transportation (ODOT) has installed several stormwater : treatment facilities throughout the State to improve the quality of runoff discharged from : highways. These facilities include a variety of both above ground and below...
Support increased adoption of green infrastructure into ...
This project will provide technical assistance to support implementation of GI in U.S. communities and information on best practices for GI approaches that protect ground water supplies. Case studies that can be more broadly applied to other communities will be conducted. The project will provide program and regional offices with guidance on GI planning, implementation, and maintenance for stormwater management and capture/aquifer storage. To share information on SSWR research projects
The Telecommunications and Data Acquisition Report
NASA Technical Reports Server (NTRS)
Yuen, Joseph H. (Editor)
1993-01-01
This quarterly publication provides archival reports on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA). In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DSN) in planning, supporting research and technology, implementation, and operations. Also included are standards activity at JPL for space data and information systems and reimbursable DSN work performed for other space agencies through NASA. The papers included in this document cover satellite tracking and ground-based navigation, spacecraft-ground communications, and optical communication systems for the Deep Space Network.
The Telecommunications and Data Acquisition Report
NASA Technical Reports Server (NTRS)
Posner, E. C. (Editor)
1990-01-01
Archival reports are given on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA), including space communications, radio navigation, radio science, ground-based radio and radar astronomy, and the Deep Space Network (DSN) and its associated Ground Communications Facility (GCF) in planning, supporting research and technology, implementation, and operations. Also included is TDA-funded activity at JPL on data and information systems and reimbursable DSN work performed for other space agencies through NASA. In the search for extraterrestrial intelligence (SETI), implementation and operations for searching the microwave spectrum are reported. Use of the Goldstone Solar System Radar for scientific exploration of the planets, their rings and satellites, asteroids, and comets are discussed.
Ground operation of robotics on Space Station Freedom
NASA Technical Reports Server (NTRS)
Wojcik, Z. Alex; Hunter, David G.; Cantin, Marc R.
1993-01-01
This paper reflects work carried out on Ground Operated Telerobotics (GOT) in 1992 to refine further the ideas, procedures, and technologies needed to test the procedures in a high latency environment, and to integrate GOT into Space Station Freedom operations. Space Station Freedom (SSF) will be in operation for 30 years, and will depend on robots to carry out a significant part of the assembly, maintenance, and utilization workload. Current plans call for on-orbit robotics to be operated by on-board crew members. This approach implies that on-orbit robotics operations use up considerable crew time, and that these operations cannot be carried out when SSF is unmanned. GOT will allow robotic operations to be operated from the ground, with on-orbit crew interventions only when absolutely required. The paper reviews how GOT would be implemented, how GOT operations would be planned and supported, and reviews GOT issues, critical success factors, and benefits.
Ground operation of robotics on Space Station Freedom
NASA Astrophysics Data System (ADS)
Wojcik, Z. Alex; Hunter, David G.; Cantin, Marc R.
1993-03-01
This paper reflects work carried out on Ground Operated Telerobotics (GOT) in 1992 to refine further the ideas, procedures, and technologies needed to test the procedures in a high latency environment, and to integrate GOT into Space Station Freedom operations. Space Station Freedom (SSF) will be in operation for 30 years, and will depend on robots to carry out a significant part of the assembly, maintenance, and utilization workload. Current plans call for on-orbit robotics to be operated by on-board crew members. This approach implies that on-orbit robotics operations use up considerable crew time, and that these operations cannot be carried out when SSF is unmanned. GOT will allow robotic operations to be operated from the ground, with on-orbit crew interventions only when absolutely required. The paper reviews how GOT would be implemented, how GOT operations would be planned and supported, and reviews GOT issues, critical success factors, and benefits.
Patterns of Ground Water Movement in a Portion of the Willamette River Floodplain, Oregon
In reaches unconstrained by revetments, the Willamette River and its floodplain along its lowland mainstem is a continually evolving system. Several channel reconstruction and restoration projects have been implemented or planned in order to obtain beneficial services along the r...
The Telecommunications and Data Acquisition Report
NASA Technical Reports Server (NTRS)
Posner, E. C. (Editor)
1990-01-01
Archival reports on developments in programs managed by the Jet Propulsion Laboratory's (JPL) Office of Telecommunications and Data Acquisition (TDA) are given. Space communications, radio navigation, radio science, and ground-based radio and radar astronomy, activities of the Deep Space Network (DSN) and its associated Ground Communications Facility (GCF) in planning, supporting research and technology, implementation, and operations are reported. Also included is TDA-funded activity at JPL on data and information systems and reimbursable Deep Space Network (DSN) work performed for other space agencies through NASA.
Barriers to Implementation of Recommendations for Transport of Children in Ground Ambulances.
Woods, Rashida H; Shah, Manish; Doughty, Cara; Gilchrest, Anthony
2017-10-16
The National Highway Traffic Safety Administration (NHTSA) released draft recommendations in 2010 on the safe transport of children in ground ambulances. The purpose of this study was to assess awareness of these guidelines among emergency medical service (EMS) agencies and to identify implementation barriers. We conducted a cross-sectional, anonymous online survey of 911-responding, ground transport EMS agencies in Texas. Demographics, modes of transport based on case scenarios, and barriers to implementation were assessed. Of 62 eligible EMS agencies that took the survey, 35.7% were aware of the NHTSA guidelines, 62.5% agreed they would improve safety, and 41.1% planned to implement them. Seventy-five percent of EMS agencies used the ideal or acceptable alternative to transport children requiring continuous monitoring, and 69.5% chose ideal or acceptable alternatives for children requiring spinal immobilization. The ideal or acceptable alternative was not chosen for children who were not injured or ill (93.2%), ill or injured but not requiring continuous monitoring (53.3%), and situations when multiple patients required transport (57.6%). The main requirements for implementation were provider education, ambulance interior modifications, new guidelines in the EMS agency, and purchase of new equipment. Few EMS agencies are aware of the NHTSA guidelines on safe transport of children in ground ambulances. Although most agencies appropriately transport children who require monitoring, interventions, or spinal immobilization, they use inappropriate means to transport children in situations with multiple patients, lack of injury or illness, or lack of need for monitoring.
Thermal integrity profiling for augered cast-in-place piles – implementation plan : summary.
DOT National Transportation Integrated Search
2017-09-01
Auger-cast-in-place (ACIP) piles are created when an auger the diameter and length of the desired pile is drilled into the ground. Concrete is pumped through the central axis of the auger as it is withdrawn, pulling up excavated soil as concrete fill...
Strategic Goals Implementation Plan V2.0
2008-01-01
newest ATARS ground station. (Sep 08) (DDR&E) 3.1.6 Take proactive steps to transition technology programs. DUSD(AS&C) • Proactive steps taken to...increases emphasis on math as gateway to physical science and engineering. • Expanded footprint of S&E education in Middle School. 3.3.4 Support
Step by Step to Smoke-Free Schools.
ERIC Educational Resources Information Center
VanSciver, James H.; Roberts, H. Earl
1989-01-01
This ERIC digest discusses ways of effectively banning smoking in schools so that controversies do not continue after implementation of the policy. By advocating a process approach, the document cites steps taken by the Lake Forest School Board to prohibit smoking in and around school grounds. Step one involved committee planning involving…
The Telecommunications and Data Acquisition Report
NASA Technical Reports Server (NTRS)
Posner, E. C. (Editor)
1985-01-01
Reports on developments in space communications, radio navigation, radio science, and ground-based radio astronomy are presented. Activities of the Deep Space Network (DSN) are reported in the areas of planning, supporting research and technology, implementation and operations. The application of radio interferometry at microwave frequencies for geodynamic measurements is also discussed.
Knowledge Management ERP Curriculum Design/Mapping (Theory and Development Tools)
ERIC Educational Resources Information Center
Swanson, Zane; Hepner, Michelle
2011-01-01
This study proposes a knowledge management framework for developing and managing enterprise resource planning (ERP) curriculum within business schools. Both theory and a practical implementation are addressed. The knowledge management (KM) framework has two components which utilize ERP from a big picture curriculum overview and a ground level…
NASA Technical Reports Server (NTRS)
Mcmanus, Shawn; Mcdaniel, Michael
1989-01-01
Planning for processing payloads was always difficult and time-consuming. With the advent of Space Station Freedom and its capability to support a myriad of complex payloads, the planning to support this ground processing maze involves thousands of man-hours of often tedious data manipulation. To provide the capability to analyze various processing schedules, an object oriented knowledge-based simulation environment called the Advanced Generic Accomodations Planning Environment (AGAPE) is being developed. Having nearly completed the baseline system, the emphasis in this paper is directed toward rule definition and its relation to model development and simulation. The focus is specifically on the methodologies implemented during knowledge acquisition, analysis, and representation within the AGAPE rule structure. A model is provided to illustrate the concepts presented. The approach demonstrates a framework for AGAPE rule development to assist expert system development.
Snyder, Kimberly; Rieker, Patricia P.
2014-01-01
Functioning program infrastructure is necessary for achieving public health outcomes. It is what supports program capacity, implementation, and sustainability. The public health program infrastructure model presented in this article is grounded in data from a broader evaluation of 18 state tobacco control programs and previous work. The newly developed Component Model of Infrastructure (CMI) addresses the limitations of a previous model and contains 5 core components (multilevel leadership, managed resources, engaged data, responsive plans and planning, networked partnerships) and 3 supporting components (strategic understanding, operations, contextual influences). The CMI is a practical, implementation-focused model applicable across public health programs, enabling linkages to capacity, sustainability, and outcome measurement. PMID:24922125
Site observational work plan for the UMTRA Project site at Monument Valley, Arizona
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-09-01
The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agencymore » (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.« less
The Telecommunications and Data Acquisition Report
NASA Technical Reports Server (NTRS)
Posner, E. C. (Editor)
1987-01-01
This quarterly publication (July-September 1987) provides archival reports on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA). In space communications, radio navigation, radio science, and ground-based radio astronomy, it reports on activities of the Deep Space Network (DSN) and its associated Ground Communications Facility (GCF) in planning, in supporting research and technology, in implementation, and in operations. This work is performed for NASA's Office of Space Tracking and Data Systems (OSTDS). In geodynamics, the publication reports on the application of radio interferometry at microwave frequencies for geodynamic measurements. In the Search for Extraterrestrial Intelligence (SETI), it reports on implementation and operations for searching the microwave spectrum. The latter two programs are performed for NASA's Office of Space Science and Applications (OSSA).
The Telecommunications and Data Acquisition Report
NASA Technical Reports Server (NTRS)
Posner, E. C. (Editor)
1986-01-01
This quarterly publication (July-Sept. 1986) provides archival reports on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA). In space communications, radio navigation, radio science, and ground-based radio astronomy, it reports on activities of the Deep Space Network (DSN) and its associated Ground Communications Facility (GCF) in planning, in supporting research and technology, in implementation, and in operations. This work is performed for NASA's Office of Space Tracking and Data Systems (OSTDS). In geodynamics, the publication reports on the application of radio interferometry at microwave frequencies for geodynamic measurements. In the search for extraterrestrial intelligence (SETI), it reports on implementation and operations for searching the microwave spectrum. The latter two programs are performed for NASA's Office of Space Science and Applications (OSSA).
Advanced Ground Systems Maintenance Physics Models For Diagnostics Project
NASA Technical Reports Server (NTRS)
Perotti, Jose M.
2015-01-01
The project will use high-fidelity physics models and simulations to simulate real-time operations of cryogenic and systems and calculate the status/health of the systems. The project enables the delivery of system health advisories to ground system operators. The capability will also be used to conduct planning and analysis of cryogenic system operations. This project will develop and implement high-fidelity physics-based modeling techniques tosimulate the real-time operation of cryogenics and other fluids systems and, when compared to thereal-time operation of the actual systems, provide assessment of their state. Physics-modelcalculated measurements (called “pseudo-sensors”) will be compared to the system real-timedata. Comparison results will be utilized to provide systems operators with enhanced monitoring ofsystems' health and status, identify off-nominal trends and diagnose system/component failures.This capability can also be used to conduct planning and analysis of cryogenics and other fluidsystems designs. This capability will be interfaced with the ground operations command andcontrol system as a part of the Advanced Ground Systems Maintenance (AGSM) project to helpassure system availability and mission success. The initial capability will be developed for theLiquid Oxygen (LO2) ground loading systems.
Impact of Wellness Legislation on Comprehensive School Health Programs
ERIC Educational Resources Information Center
Graber, Kim C.; Woods, Amelia Mays; O'Connor, Jamie A.
2012-01-01
In 2004, Congress passed the Child Nutrition and WIC Reauthorization Act that requires schools to implement a wellness plan. Grounded in Ecological Systems Theory (EST) (Bronfenbrenner, 1977, 1979), the purpose of this study was to explore the impact of the legislation, discover what measures have been taken to enact the legislation, gauge how the…
Teaching Intercultural Competence across the Age Range: From Theory to Practice
ERIC Educational Resources Information Center
Wagner, Manuela, Ed.; Perugini, Dorie Conlon, Ed.; Byram, Michael, Ed.
2017-01-01
This ground-breaking book is the first to describe in detail how teachers, supported by university educators and education advisers, might plan and implement innovative ideas based on sound theoretical foundations. Focusing on the teaching and learning of intercultural communicative competence in foreign language classrooms in the USA, the authors…
Selecting and implementing scientific objectives. [for Voyager 1 and 2 planetary encounters
NASA Technical Reports Server (NTRS)
Miner, E. D.; Stembridge, C. H.; Doms, P. E.
1985-01-01
The procedures used to select and implement scientific objectives for the Voyager 1 and 2 planetary encounters are described. Attention is given to the scientific tradeoffs and engineering considerations must be addressed at various stages in the mission planning process, including: the limitations of ground and spacecraft communications systems, ageing of instruments in flight, and instrument calibration over long distances. The contribution of planetary science workshops to the definition of scientific objectives for deep space missions is emphasized.
Zero to Integration in Eight Months, the Dawn Ground Data System Engineering Challenge
NASA Technical Reports Server (NTRS)
Dubon, Lydia P.
2006-01-01
The Dawn Project has presented the Ground Data System (GDS) with technical challenges driven by cost and schedule constraints commonly associated with National Aeronautics and Space Administration (NASA) Discovery Projects. The Dawn mission consists of a new and exciting Deep Space partnership among: the Jet Propulsion Laboratory (JPL), manages the project and is responsible for flight operation; Orbital Sciences Corporation (OSC), is the spacecraft builder and is responsible for flight system test and integration; and the University of California, at Los Angeles (UCLA), is responsible for science planning and operations. As a cost-capped mission, one of Dawn's implementation strategies is to leverage from both flight and ground heritage. OSC's ground data system is used for flight system test and integration as part of the flight heritage strategy. Mission operations, however, are to be conducted with JPL's ground system. The system engineering challenge of dealing with two heterogeneous ground systems emerged immediately. During the first technical interchange meeting between the JPL's GDS Team and OSC's Flight Software Team, August 2003, the need to integrate the ground system with the flight software was brought to the table. This need was driven by the project's commitment to enable instrument engineering model integration in a spacecraft simulator environment, for both demonstration and risk mitigation purposes, by April 2004. This paper will describe the system engineering approach that was undertaken by JPL's GDS Team in order to meet the technical challenge within a non-negotiable eight-month schedule. Key to the success was adherence to fundamental systems engineering practices: decomposition of the project request into manageable requirements; integration of multiple ground disciplines and experts into a focused team effort; definition of a structured yet flexible development process; definition of an in-process risk reduction plan; and aggregation of the intermediate products to an integrated final product. In addition, this paper will highlight the role of lessons learned from the integration experience. The lessons learned from an early GDS deployment have served as the foundation for the design and implementation of the Dawn Ground Data System.
A Survey of Restraint Methods for the Safe Transport of Children in Ground Ambulances.
Woods, Rashida H; Shah, Manish; Doughty, Cara; Gilchrest, Anthony
2018-03-01
The National Highway Traffic Safety Administration (NHTSA) released draft recommendations in 2010 on the safe transport of children in ground ambulances. The purpose of this study was to assess awareness of these guidelines among emergency medical service (EMS) agencies and to identify implementation barriers. We conducted a cross-sectional, anonymous online survey of 911-responding, ground transport EMS agencies in Texas. Demographics, modes of transport based on case scenarios, and barriers to implementation were assessed. Of 62 eligible EMS agencies that took the survey, 35.7% were aware of the NHTSA guidelines, 62.5% agreed they would improve safety, and 41.1% planned to implement them. Seventy-five percent of EMS agencies used the ideal or acceptable alternative to transport children requiring continuous monitoring, and 69.5% chose ideal or acceptable alternatives for children requiring spinal immobilization. The ideal or acceptable alternative was not chosen for children who were not injured or ill (93.2%), ill or injured but not requiring continuous monitoring (53.3%), and situations when multiple patients required transport (57.6%). The main requirements for implementation were provider education, ambulance interior modifications, new guidelines in the EMS agency, and purchase of new equipment. Few EMS agencies are aware of the NHTSA guidelines on safe transport of children in ground ambulances. Although most agencies appropriately transport children who require monitoring, interventions, or spinal immobilization, they use inappropriate means to transport children in situations with multiple patients, lack of injury or illness, or lack of need for monitoring.
Safer Systems: A NextGen Aviation Safety Strategic Goal
NASA Technical Reports Server (NTRS)
Darr, Stephen T.; Ricks, Wendell R.; Lemos, Katherine A.
2008-01-01
The Joint Planning and Development Office (JPDO), is charged by Congress with developing the concepts and plans for the Next Generation Air Transportation System (NextGen). The National Aviation Safety Strategic Plan (NASSP), developed by the Safety Working Group of the JPDO, focuses on establishing the goals, objectives, and strategies needed to realize the safety objectives of the NextGen Integrated Plan. The three goal areas of the NASSP are Safer Practices, Safer Systems, and Safer Worldwide. Safer Practices emphasizes an integrated, systematic approach to safety risk management through implementation of formalized Safety Management Systems (SMS) that incorporate safety data analysis processes, and the enhancement of methods for ensuring safety is an inherent characteristic of NextGen. Safer Systems emphasizes implementation of safety-enhancing technologies, which will improve safety for human-centered interfaces and enhance the safety of airborne and ground-based systems. Safer Worldwide encourages coordinating the adoption of the safer practices and safer systems technologies, policies and procedures worldwide, such that the maximum level of safety is achieved across air transportation system boundaries. This paper introduces the NASSP and its development, and focuses on the Safer Systems elements of the NASSP, which incorporates three objectives for NextGen systems: 1) provide risk reducing system interfaces, 2) provide safety enhancements for airborne systems, and 3) provide safety enhancements for ground-based systems. The goal of this paper is to expose avionics and air traffic management system developers to NASSP objectives and Safer Systems strategies.
Lipsky, Alyson B; Gribble, James N; Cahaelen, Linda; Sharma, Suneeta
2016-01-01
ABSTRACT In global health, partnerships between practitioners and policy makers facilitate stakeholders in jointly addressing those issues that require multiple perspectives for developing, implementing, and evaluating plans, strategies, and programs. For family planning, costed implementation plans (CIPs) are developed through a strategic government-led consultative process that results in a detailed plan for program activities and an estimate of the funding required to achieve an established set of goals. Since 2009, many countries have developed CIPs. Conventionally, the CIP approach has not been defined with partnerships as a focal point; nevertheless, cooperation between key stakeholders is vital to CIP development and execution. Uganda launched a CIP in November 2014, thus providing an opportunity to examine the process through a partnership lens. This article describes Uganda’s CIP development process in detail, grounded in a framework for assessing partnerships, and provides the findings from 22 key informant interviews. Findings reveal strengths in Uganda’s CIP development process, such as willingness to adapt and strong senior management support. However, the evaluation also highlighted challenges, including district health officers (DHOs), who are a key group of implementers, feeling excluded from the development process. There was also a lack of planning around long-term partnership practices that could help address anticipated execution challenges. The authors recommend that future CIP development efforts use a long-term partnership strategy that fosters accountability by encompassing both the short-term goal of developing the CIP and the longer-term goal of achieving the CIP objectives. Although this study focused on Uganda’s CIP for family planning, its lessons have implications for any policy or strategy development efforts that require multiple stakeholders to ensure successful execution. PMID:27353621
Hooper, Paula; Giles-Corti, Billie; Knuiman, Matthew
2014-01-01
Evaluate the implementation of a government planning policy (Liveable Neighbourhoods Guidelines) and its impacts on residents' walking behaviors. Cross-sectional study of participants from the RESIDential Environments project (RESIDE). Nineteen "liveable" and 17 "conventionally designed" housing developments across Perth, Western Australia. Five hundred ninety-four participants from RESIDE who resided in 36 housing developments. Developed in geographic information systems to assess the on-ground implementation of 43 policy requirements. Policy compliance was defined as the degree to which construction of the developments adhered to the standards outlined. Walking behaviors were measured using the Neighborhood Physical Activity Questionnaire. K-means cluster analyses identified groups of homogeneous developments with respect to policy implementation. Logistic regression with generalized estimating equations estimated the odds ratios (ORs) and 95% confidence intervals (95% CIs) for the likelihood of undertaking any and ≥ 60 minutes of transport and recreational walking associated with (1) policy compliance and (2) different clusters of developments. There were few significant differences in on-ground outcomes between the two development types. Despite incomplete implementation, the odds of walking for transport increased with overall levels of policy compliance (OR = 1.53, 95% CI 1.13-2.08) and compliance with the community design (OR = 1.3, 95% CI 1.13-1.42), movement network (OR = 2.49, 95% CI 1.38-4.50), and lot layout elements (OR = 1.26, 95% CI 1.06-1.50). Consistent with the aims of the policy, residents in walkable (i.e., liveable) neighborhoods may be more physically active.
One common way - The strategic and methodological influence on environmental planning across Europe
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jiricka, Alexandra, E-mail: alexandra.jiricka@boku.ac.a; Proebstl, Ulrike, E-mail: ulrike.proebstl@boku.ac.a
In the last decades the European Union exerted influence on precautionary environmental planning by the establishment of several Directives. The most relevant were the Habitat-Directive, the EIA-Directive, the SEA-Directive and the Water Framework Directive. Comparing these EU policies in the area of environmental precaution it becomes obvious that there is a lot of common ground. Thus, the conclusion seems likely that the European Union, in doing so, has intended to establish general planning concepts through introducing several methodological steps indicated by the regulations. The goal of this article is firstly to point out, which are the common planning principles, convertedmore » by methodological elements and secondly examine the consideration of these planning concepts by the implementation and application in the member states. In this context it is analysed whether the connections and divergences between the directives lead to significant differences in the implementation process. To this aim the directives are shortly introduced and significant steps of the processes regulated by them are outlined. In the second steps the national legal implementation in the Alpine states and its consequences for the practical application are discussed. The results show a heterogeneous application of the EU principles. Within the comparative view on the four directives influence and causalities between the national implementation and the practical application were identified, which can be simplified as four types. Since a coherent strategic and methodological concept for improving environmental precaution planning from part of the EU is noticeable, more unity and comparability within the implementation is desirable, particularly in areas with comparable habitats such as the alpine space. Beyond this the trade-off between the directives poses an important task for the future.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-08
... received will be included in the public docket without change and may be made available online at http... causes a reduction in visibility. Particulate matter is also deposited on the ground and in the water, changing nutrient and chemical balances. IV. What action is EPA taking? EPA is approving revisions to the...
2004-06-30
gasoline fuels is a result ofleaking USTs in the Aqua System Site (SS-19) to the north. Volatile petroleum hydrocarbon ( VPH ) contamination from the...in- situ enhanced bioremediation plan wilJ be implemented to reduce the concentrations of VPH that are present in soils in the groundwater saturated
The Telecommunications and Data Acquisition Report
NASA Technical Reports Server (NTRS)
Yuen, Joseph H. (Editor)
1994-01-01
This quarterly publication provides archival reports on developments in programs in space communications, radio navigation, radio science, and ground-based radio and radar astronomy. It reports on activities of the Deep Space Network (DSN) in planning, supporting research and technology, implementation, and operations. Also included are standardization activities at the Jet Propulsion Laboratory for space data and information systems.
This project will provide technical assistance to support implementation of GI in U.S. communities and information on best practices for GI approaches that protect ground water supplies. Case studies that can be more broadly applied to other communities will be conducted. The pro...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-08
... before permit issuance. The rule only allows installing concrete foundations work, below ground plumbing...)), submitted on May 28, 2003; 17.8.743 (except the phrases ``asphalt concrete plants, mineral crushers'' in 17... following provisions in Subchapter 7: ARM 17.8.743(1)(c) and ARM 17.8.770, the phrase ``asphalt concrete...
Policy versus Ground Reality: Secondary English Language Assessment System in Bangladesh
ERIC Educational Resources Information Center
Das, Sharmistha; Shaheen, Robina; Shrestha, Prithvi; Rahman, Arifa; Khan, Rubina
2014-01-01
Any policy reform in education is highly effective when it is planned and implemented "holistically" and yet, it is the most challenging way forward. Many countries in Asia have reformed their English language policies and syllabi in the last two decades due to the increasing value of the language worldwide. Motivated by a…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-17
... natural gas 7/22/1998 6/17/1998 Repeal and readoption disapproval. processing, as Section treating, or 116... for Changes at Certain Natural Gas Processing, Treating, or Compression Facilities 1. What is the... the following grounds: This definition exempts changes at certain natural gas processing, treating, or...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-14
... fairy shrimp and the San Joaquin kit fox. The applicant would implement a conservation strategy program... listed species will be included as covered species in the applicant's proposed HCP: San Joaquin kit fox... Protection of the Endangered San Joaquin Kit Fox Prior to or During Ground Disturbance.'' Other avoidance and...
NASA Technical Reports Server (NTRS)
1976-01-01
Engineering and operational facets associated with the implementation of the first two AMPS flights are covered. The payload is described including all systems and subsystems and the mission planning and flight operations are described too. Payload integration, ground operations, and logistics are included along with key supporting analyses and mass properties.
De-mystifying earned value management for ground based astronomy projects, large and small
NASA Astrophysics Data System (ADS)
Norton, Timothy; Brennan, Patricia; Mueller, Mark
2014-08-01
The scale and complexity of today's ground based astronomy projects have justifiably required Principal Investigator's and their project teams to adopt more disciplined management processes and tools in order to achieve timely and accurate quantification of the progress and relative health of their projects. Earned Value Management (EVM) is one such tool. Developed decades ago and used extensively in the defense and construction industries, and now a requirement of NASA projects greater than $20M; EVM has gained a foothold in ground-based astronomy projects. The intent of this paper is to de-mystify EVM by discussing the fundamentals of project management, explaining how EVM fits with existing principles, and describing key concepts every project can use to implement their own EVM system. This paper also discusses pitfalls to avoid during implementation and obstacles to its success. The authors report on their organization's most recent experience implementing EVM for the GMT-Consortium Large Earth Finder (G-CLEF) project. G-CLEF is a fiber-fed, optical echelle spectrograph that has been selected as a first light instrument for the Giant Magellan Telescope (GMT), planned for construction at the Las Campanas Observatory in Chile's Atacama Desert region.
CISN ShakeAlert: Using early warnings for earthquakes in California
NASA Astrophysics Data System (ADS)
Vinci, M.; Hellweg, M.; Jones, L. M.; Khainovski, O.; Schwartz, K.; Lehrer, D.; Allen, R. M.; Neuhauser, D. S.
2009-12-01
Educated users who have developed response plans and procedures are just as important for an earthquake early warning (EEW) system as are the algorithms and computers that process the data and produce the warnings. In Japan, for example, the implementation of the EEW system which now provides advanced alerts of ground shaking included intense outreach efforts to both institutional and individual recipients. Alerts are now used in automatic control systems that stop trains, place sensitive equipment in safe mode and isolate hazards while the public takes cover. In California, the California Integrated Seismic Network (CISN) is now developing and implementing components of a prototype system for EEW, ShakeAlert. As this processing system is developed, we invite a suite of perspective users from critical industries and institutions throughout California to partner with us in developing useful ShakeAlert products and procedures. At the same time, we will support their efforts to determine and implement appropriate responses to an early warning of earthquake shaking. As a first step, in a collaboration with BART, we have developed a basic system allowing BART’s operation center to receive realtime ground shaking information from more than 150 seismic stations operating in the San Francisco Bay Area. BART engineers are implementing a display system for this information. Later phases will include the development of improved response procedures utilizing this information. We plan to continue this collaboration to include more sophisticated information from the prototype CISN ShakeAlert system.
Simplifying operations with an uplink/downlink integration toolkit
NASA Technical Reports Server (NTRS)
Murphy, Susan C.; Miller, Kevin J.; Guerrero, Ana Maria; Joe, Chester; Louie, John J.; Aguilera, Christine
1994-01-01
The Operations Engineering Lab (OEL) at JPL has developed a simple, generic toolkit to integrate the uplink/downlink processes, (often called closing the loop), in JPL's Multimission Ground Data System. This toolkit provides capabilities for integrating telemetry verification points with predicted spacecraft commands and ground events in the Mission Sequence Of Events (SOE) document. In the JPL ground data system, the uplink processing functions and the downlink processing functions are separate subsystems that are not well integrated because of the nature of planetary missions with large one-way light times for spacecraft-to-ground communication. Our new closed-loop monitoring tool allows an analyst or mission controller to view and save uplink commands and ground events with their corresponding downlinked telemetry values regardless of the delay in downlink telemetry and without requiring real-time intervention by the user. An SOE document is a time-ordered list of all the planned ground and spacecraft events, including all commands, sequence loads, ground events, significant mission activities, spacecraft status, and resource allocations. The SOE document is generated by expansion and integration of spacecraft sequence files, ground station allocations, navigation files, and other ground event files. This SOE generation process has been automated within the OEL and includes a graphical, object-oriented SOE editor and real-time viewing tool running under X/Motif. The SOE toolkit was used as the framework for the integrated implementation. The SOE is used by flight engineers to coordinate their operations tasks, serving as a predict data set in ground operations and mission control. The closed-loop SOE toolkit allows simple, automated integration of predicted uplink events with correlated telemetry points in a single SOE document for on-screen viewing and archiving. It automatically interfaces with existing real-time or non real-time sources of information, to display actual values from the telemetry data stream. This toolkit was designed to greatly simplify the user's ability to access and view telemetry data, and also provide a means to view this data in the context of the commands and ground events that are used to interpret it. A closed-loop system can prove especially useful in small missions with limited resources requiring automated monitoring tools. This paper will discuss the toolkit implementation, including design trade-offs and future plans for enhancing the automated capabilities.
Simplifying operations with an uplink/downlink integration toolkit
NASA Astrophysics Data System (ADS)
Murphy, Susan C.; Miller, Kevin J.; Guerrero, Ana Maria; Joe, Chester; Louie, John J.; Aguilera, Christine
1994-11-01
The Operations Engineering Lab (OEL) at JPL has developed a simple, generic toolkit to integrate the uplink/downlink processes, (often called closing the loop), in JPL's Multimission Ground Data System. This toolkit provides capabilities for integrating telemetry verification points with predicted spacecraft commands and ground events in the Mission Sequence Of Events (SOE) document. In the JPL ground data system, the uplink processing functions and the downlink processing functions are separate subsystems that are not well integrated because of the nature of planetary missions with large one-way light times for spacecraft-to-ground communication. Our new closed-loop monitoring tool allows an analyst or mission controller to view and save uplink commands and ground events with their corresponding downlinked telemetry values regardless of the delay in downlink telemetry and without requiring real-time intervention by the user. An SOE document is a time-ordered list of all the planned ground and spacecraft events, including all commands, sequence loads, ground events, significant mission activities, spacecraft status, and resource allocations. The SOE document is generated by expansion and integration of spacecraft sequence files, ground station allocations, navigation files, and other ground event files. This SOE generation process has been automated within the OEL and includes a graphical, object-oriented SOE editor and real-time viewing tool running under X/Motif. The SOE toolkit was used as the framework for the integrated implementation. The SOE is used by flight engineers to coordinate their operations tasks, serving as a predict data set in ground operations and mission control. The closed-loop SOE toolkit allows simple, automated integration of predicted uplink events with correlated telemetry points in a single SOE document for on-screen viewing and archiving. It automatically interfaces with existing real-time or non real-time sources of information, to display actual values from the telemetry data stream. This toolkit was designed to greatly simplify the user's ability to access and view telemetry data, and also provide a means to view this data in the context of the commands and ground events that are used to interpret it. A closed-loop system can prove especially useful in small missions with limited resources requiring automated monitoring tools. This paper will discuss the toolkit implementation, including design trade-offs and future plans for enhancing the automated capabilities.
NASA Technical Reports Server (NTRS)
Martelli, Andrea
1994-01-01
This paper presents the capabilities implemented in the SAX system for an efficient operations management during its in-flight mission. SAX is an Italian scientific satellite for x-ray astronomy whose major mission objectives impose quite tight constraints on the implementation of both the space and ground segment. The most relevant mission characteristics require an operative lifetime of two years, performing scientific observations both in contact and in noncontact periods, with a low equatorial orbit supported by one ground station, so that only a few minutes of communications are available each orbit. This operational scenario determines the need to have a satellite capable of performing the scheduled mission automatically and reacting autonomously to contingency situations. The implementation approach of the on-board operations management, through which the necessary automation and autonomy are achieved, follows a hierarchical structure. This has been achieved adopting a distributed avionic architecture. Nine different on-board computers, in fact, constitute the on-board data management system. Each of them performs the local control and monitors its own functions while the system level control is performed at a higher level by the data handling applications software. The SAX on-board architecture provides the ground operators with different options of intervention by three classes of telecommands. The management of the scientific operations will be scheduled by the operation control center via dedicated operating plans. The SAX satellite flight mode is presently being integrated at Alenia Spazio premises in Turin for a launch scheduled for the end of 1995. Once in orbit, the SAX satellite will be subject to intensive check-out activities in order to verify the required mission performances. An overview of the envisaged procedure and of the necessary on-ground activities is therefore depicted as well.
Ground test article for deployable space structure systems
NASA Technical Reports Server (NTRS)
Malloy, G. D.
1984-01-01
The ground test article fabrication and assembly plan was completed by Santek Engineering, Inc. The plan was reviewed and accepted by Rockwell during an on-site visit to the Santek facility. Raw material and hardware orders were placed by Santek in July. Approximately 98% of the raw materials and 10% of the hardware deliveries have been completed. Several material and hardware substitutions were requested by Santek due to no-bid responses from suppliers or excessive costs for limited quantity items. These substitutions were evaluated and approved by Rockwell Engineering and Material and Process and are being incorporated into the drawing package. Santek started fabrication of detail parts in mid-August. Their current resource utilization is at approximately 50% of the planned eventual commitment and is increasing at a rate commensurate with the fabrication and assembly plan. At this writing, Santek's estimate of completion is 03%. During verification testing of the diagonal member joint, in a program funded by Rockwell discretionary funds, the axial load to unlock the joint was found to increase significantly after a few cycles of operation. This was attributed to galling, poor lubrication, and locking pin geometry. A change of materials, lubricant, and modification of the pin geometry reduced the unlocking load and provided repeatability after 50 cycles of operation. This new design is being implemented into the ground test article.
An operational model for mainstreaming ecosystem services for implementation
Cowling, Richard M.; Egoh, Benis; Knight, Andrew T.; O'Farrell, Patrick J.; Reyers, Belinda; Rouget, Mathieu; Roux, Dirk J.; Welz, Adam; Wilhelm-Rechman, Angelika
2008-01-01
Research on ecosystem services has grown markedly in recent years. However, few studies are embedded in a social process designed to ensure effective management of ecosystem services. Most research has focused only on biophysical and valuation assessments of putative services. As a mission-oriented discipline, ecosystem service research should be user-inspired and user-useful, which will require that researchers respond to stakeholder needs from the outset and collaborate with them in strategy development and implementation. Here we provide a pragmatic operational model for achieving the safeguarding of ecosystem services. The model comprises three phases: assessment, planning, and management. Outcomes of social, biophysical, and valuation assessments are used to identify opportunities and constraints for implementation. The latter then are transformed into user-friendly products to identify, with stakeholders, strategic objectives for implementation (the planning phase). The management phase undertakes and coordinates actions that achieve the protection of ecosystem services and ensure the flow of these services to beneficiaries. This outcome is achieved via mainstreaming, or incorporating the safeguarding of ecosystem services into the policies and practices of sectors that deal with land- and water-use planning. Management needs to be adaptive and should be institutionalized in a suite of learning organizations that are representative of the sectors that are concerned with decision-making and planning. By following the phases of our operational model, projects for safeguarding ecosystem services are likely to empower stakeholders to implement effective on-the-ground management that will achieve resilience of the corresponding social-ecological systems. PMID:18621695
NASA tire/runway friction projects
NASA Technical Reports Server (NTRS)
Yager, Thomas J.
1995-01-01
The paper reviews several aspects of NASA Langley Research Center's tire/runway friction evaluations directed towards improving the safety and economy of aircraft ground operations. The facilities and test equipment used in implementing different aircraft tire friction studies and other related aircraft ground performance investigations are described together with recent workshop activities at NASA Wallops Flight Facility. An overview of the pending Joint NASA/Transport Canada/FM Winter Runway Friction Program is given. Other NASA ongoing studies and on-site field tests are discussed including tire wear performance and new surface treatments. The paper concludes with a description of future research plans.
The Telecommunications and Data Acquisition Report
NASA Technical Reports Server (NTRS)
Posner, Edward C. (Editor)
1991-01-01
A compilation is presented of articles on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition. In space communications, radio navigation, radio science, and ground based radio and radar astronomy, activities of the Deep Space Network are reported in planning, in supporting research and technology, in implementation, and in operations. Also included is standards activity at JPL for space data and information systems and reimbursable DSN work performed for other space agencies through NASA. In the search for extraterrestrial intelligence (SETI), implementation and operations are reported for searching the microwave spectrum.
Nanosatellite optical downlink experiment: design, simulation, and prototyping
NASA Astrophysics Data System (ADS)
Clements, Emily; Aniceto, Raichelle; Barnes, Derek; Caplan, David; Clark, James; Portillo, Iñigo del; Haughwout, Christian; Khatsenko, Maxim; Kingsbury, Ryan; Lee, Myron; Morgan, Rachel; Twichell, Jonathan; Riesing, Kathleen; Yoon, Hyosang; Ziegler, Caleb; Cahoy, Kerri
2016-11-01
The nanosatellite optical downlink experiment (NODE) implements a free-space optical communications (lasercom) capability on a CubeSat platform that can support low earth orbit (LEO) to ground downlink rates>10 Mbps. A primary goal of NODE is to leverage commercially available technologies to provide a scalable and cost-effective alternative to radio-frequency-based communications. The NODE transmitter uses a 200-mW 1550-nm master-oscillator power-amplifier design using power-efficient M-ary pulse position modulation. To facilitate pointing the 0.12-deg downlink beam, NODE augments spacecraft body pointing with a microelectromechanical fast steering mirror (FSM) and uses an 850-nm uplink beacon to an onboard CCD camera. The 30-cm aperture ground telescope uses an infrared camera and FSM for tracking to an avalanche photodiode detector-based receiver. Here, we describe our approach to transition prototype transmitter and receiver designs to a full end-to-end CubeSat-scale system. This includes link budget refinement, drive electronics miniaturization, packaging reduction, improvements to pointing and attitude estimation, implementation of modulation, coding, and interleaving, and ground station receiver design. We capture trades and technology development needs and outline plans for integrated system ground testing.
NASA Technical Reports Server (NTRS)
1993-01-01
The Second International Symposium featured 135 oral presentations in these 12 categories: Future Missions and Operations; System-Level Architectures; Mission-Specific Systems; Mission and Science Planning and Sequencing; Mission Control; Operations Automation and Emerging Technologies; Data Acquisition; Navigation; Operations Support Services; Engineering Data Analysis of Space Vehicle and Ground Systems; Telemetry Processing, Mission Data Management, and Data Archiving; and Operations Management. Topics focused on improvements in the productivity, effectiveness, efficiency, and quality of mission operations, ground systems, and data acquisition. Also emphasized were accomplishments in management of human factors; use of information systems to improve data retrieval, reporting, and archiving; design and implementation of logistics support for mission operations; and the use of telescience and teleoperations.
Simultaneous Planning and Control for Autonomous Ground Vehicles
2009-02-01
these applications is called A * ( A -star), and it was originally developed by Hart, Nilsson, and Raphael [HAR68]. Their research presented the formal...sequence, rather than a dynamic programming approach. A * search is a technique originally developed for Artificial Intelligence 43 applications ... developed at the Center for Intelligent Machines and Robotics, serves as a platform for the implementation and testing discussed. autonomous
Breaking Ground: Rebuilding New Jersey's Urban Schools. The Abbott School Construction Program
ERIC Educational Resources Information Center
Ponessa, Joan
2004-01-01
This report presents a brief history of the Abbott School Construction Program, describes the implementation to date, lays out some current challenges, and outlines lessons learned from the process so far--what is known now about how such an initiative should be planned and carried out. The report is intended to illuminate the complex process of…
Fire safety of ground-based space facilities on the spaceport ;Vostochny;
NASA Astrophysics Data System (ADS)
Artamonov, Vladimir S.; Gordienko, Denis M.; Melikhov, Anatoly S.
2017-06-01
The facilities of the spaceport ;Vostochny; and the innovative technologies for fire safety to be implemented are considered. The planned approaches and prospects for fire safety ensuring at the facilities of the spaceport ;Vostochny; are presented herein, based on the study of emergency situations having resulted in fire accidents and explosion cases at the facilities supporting space vehicles operation.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-25
... organic compounds (VOCs) react in the presence of sunlight to form ground-level ozone. NO X and VOCs are.... This area includes 54 cities and towns in Hillsborough, Merrimack, Rockingham, and Strafford Counties. See 40 CFR 81.330, for exact listing of cities and towns. The CAA contains two sets of provisions...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harrison, Thomas J.; Howard, Richard H.; Rader, Jordan D.
This document is a notional technology implementation plan (TIP) for the development, testing, and qualification of a prototypic fuel element to support design and construction of a nuclear thermal propulsion (NTP) engine, specifically its pre-flight ground test. This TIP outlines a generic methodology for the progression from non-nuclear out-of-pile (OOP) testing through nuclear in-pile (IP) testing, at operational temperatures, flows, and specific powers, of an NTP fuel element in an existing test reactor. Subsequent post-irradiation examination (PIE) will occur in existing radiological facilities. Further, the methodology is intended to be nonspecific with respect to fuel types and irradiation or examinationmore » facilities. The goals of OOP and IP testing are to provide confidence in the operational performance of fuel system concepts and provide data to program leadership for system optimization and fuel down-selection. The test methodology, parameters, collected data, and analytical results from OOP, IP, and PIE will be documented for reference by the NTP operator and the appropriate regulatory and oversight authorities. Final full-scale integrated testing would be performed separately by the reactor operator as part of the preflight ground test.« less
NASA Astrophysics Data System (ADS)
Harris, E.
Planning, Implementation and Optimization of Future Space Missions using an Immersive Visualization Environment (IVE) Machine E. N. Harris, Lockheed Martin Space Systems, Denver, CO and George.W. Morgenthaler, U. of Colorado at Boulder History: A team of 3-D engineering visualization experts at the Lockheed Martin Space Systems Company have developed innovative virtual prototyping simulation solutions for ground processing and real-time visualization of design and planning of aerospace missions over the past 6 years. At the University of Colorado, a team of 3-D visualization experts are developing the science of 3-D visualization and immersive visualization at the newly founded BP Center for Visualization, which began operations in October, 2001. (See IAF/IAA-01-13.2.09, "The Use of 3-D Immersive Visualization Environments (IVEs) to Plan Space Missions," G. A. Dorn and G. W. Morgenthaler.) Progressing from Today's 3-D Engineering Simulations to Tomorrow's 3-D IVE Mission Planning, Simulation and Optimization Techniques: 3-D (IVEs) and visualization simulation tools can be combined for efficient planning and design engineering of future aerospace exploration and commercial missions. This technology is currently being developed and will be demonstrated by Lockheed Martin in the (IVE) at the BP Center using virtual simulation for clearance checks, collision detection, ergonomics and reach-ability analyses to develop fabrication and processing flows for spacecraft and launch vehicle ground support operations and to optimize mission architecture and vehicle design subject to realistic constraints. Demonstrations: Immediate aerospace applications to be demonstrated include developing streamlined processing flows for Reusable Space Transportation Systems and Atlas Launch Vehicle operations and Mars Polar Lander visual work instructions. Long-range goals include future international human and robotic space exploration missions such as the development of a Mars Reconnaissance Orbiter and Lunar Base construction scenarios. Innovative solutions utilizing Immersive Visualization provide the key to streamlining the mission planning and optimizing engineering design phases of future aerospace missions.
Evaluating barnyard Best Management Practices in Wisconsin using upstream-downstream monitoring
Stuntebeck, Todd D.
1995-01-01
The Nonpoint Source Water Pollution Abatement Program was created in 1978 by the Wisconsin Legislature. The goal of the program is to improve and protect the water quality of lakes, streams, wetlands, and ground water within selected priority watersheds by controlling sources of nonpoint pollution. For each selected watershed, the Wisconsin Department of Natural Resources drafts a management plan that guides the implementation of pollution-control strategies known as Best Management Practices (BMP's). This plan summarizes resource and land-use inventories, describes the results of pollution-source modeling, and suggests pollution reduction goals. The U.S. Geological Survey, through a cooperative effort with the Wisconsin Department of Natural Resources, is monitoring water-quality improvements that result from the implementation of BMP's. The data collected are then compared to the watershed plans to assess progress and determine whether goals are being realized. This fact sheet describes the data-collection efforts, preliminary results, and planned data-analysis techniques of monitoring projects for pre-BMP conditions at two barnyards, one each on Otter Creek and Halfway Prairie Creek.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhang, Tong; Price, Stephen F.; Ju, Lili
Here, we present a comparison of the numerics and simulation results for two "full" Stokes ice sheet models, FELIX-S (Leng et al. 2012) and Elmer/Ice. The models are applied to the Marine Ice Sheet Model Intercomparison Project for plan view models (MISMIP3d). For the diagnostic experiment (P75D) the two models give similar results (< 2 % difference with respect to along-flow velocities) when using identical geometries and computational meshes, which we interpret as an indication of inherent consistencies and similarities between the two models. For the standard (Stnd), P75S, and P75R prognostic experiments, we find that FELIX-S (Elmer/Ice) grounding linesmore » are relatively more retreated (advanced), results that are consistent with minor differences observed in the diagnostic experiment results and that we show to be due to different choices in the implementation of basal boundary conditions in the two models. While we are not able to argue for the relative favorability of either implementation, we do show that these differences decrease with increasing horizontal (i.e., both along- and across-flow) grid resolution and that grounding-line positions for FELIX-S and Elmer/Ice converge to within the estimated truncation error for Elmer/Ice. Stokes model solutions are often treated as an accuracy metric in model intercomparison experiments, but computational cost may not always allow for the use of model resolution within the regime of asymptotic convergence. In this case, we propose that an alternative estimate for the uncertainty in the grounding-line position is the span of grounding-line positions predicted by multiple Stokes models.« less
Zhang, Tong; Price, Stephen F.; Ju, Lili; ...
2017-01-25
Here, we present a comparison of the numerics and simulation results for two "full" Stokes ice sheet models, FELIX-S (Leng et al. 2012) and Elmer/Ice. The models are applied to the Marine Ice Sheet Model Intercomparison Project for plan view models (MISMIP3d). For the diagnostic experiment (P75D) the two models give similar results (< 2 % difference with respect to along-flow velocities) when using identical geometries and computational meshes, which we interpret as an indication of inherent consistencies and similarities between the two models. For the standard (Stnd), P75S, and P75R prognostic experiments, we find that FELIX-S (Elmer/Ice) grounding linesmore » are relatively more retreated (advanced), results that are consistent with minor differences observed in the diagnostic experiment results and that we show to be due to different choices in the implementation of basal boundary conditions in the two models. While we are not able to argue for the relative favorability of either implementation, we do show that these differences decrease with increasing horizontal (i.e., both along- and across-flow) grid resolution and that grounding-line positions for FELIX-S and Elmer/Ice converge to within the estimated truncation error for Elmer/Ice. Stokes model solutions are often treated as an accuracy metric in model intercomparison experiments, but computational cost may not always allow for the use of model resolution within the regime of asymptotic convergence. In this case, we propose that an alternative estimate for the uncertainty in the grounding-line position is the span of grounding-line positions predicted by multiple Stokes models.« less
Automated microwave ablation therapy planning with single and multiple entry points
NASA Astrophysics Data System (ADS)
Liu, Sheena X.; Dalal, Sandeep; Kruecker, Jochen
2012-02-01
Microwave ablation (MWA) has become a recommended treatment modality for interventional cancer treatment. Compared with radiofrequency ablation (RFA), MWA provides more rapid and larger-volume tissue heating. It allows simultaneous ablation from different entry points and allows users to change the ablation size by controlling the power/time parameters. Ablation planning systems have been proposed in the past, mainly addressing the needs for RFA procedures. Thus a planning system addressing MWA-specific parameters and workflows is highly desirable to help physicians achieve better microwave ablation results. In this paper, we design and implement an automated MWA planning system that provides precise probe locations for complete coverage of tumor and margin. We model the thermal ablation lesion as an ellipsoidal object with three known radii varying with the duration of the ablation and the power supplied to the probe. The search for the best ablation coverage can be seen as an iterative optimization problem. The ablation centers are steered toward the location which minimizes both un-ablated tumor tissue and the collateral damage caused to the healthy tissue. We assess the performance of our algorithm using simulated lesions with known "ground truth" optimal coverage. The Mean Localization Error (MLE) between the computed ablation center in 3D and the ground truth ablation center achieves 1.75mm (Standard deviation of the mean (STD): 0.69mm). The Mean Radial Error (MRE) which is estimated by comparing the computed ablation radii with the ground truth radii reaches 0.64mm (STD: 0.43mm). These preliminary results demonstrate the accuracy and robustness of the described planning algorithm.
System architecture for asynchronous multi-processor robotic control system
NASA Technical Reports Server (NTRS)
Steele, Robert D.; Long, Mark; Backes, Paul
1993-01-01
The architecture for the Modular Telerobot Task Execution System (MOTES) as implemented in the Supervisory Telerobotics (STELER) Laboratory is described. MOTES is the software component of the remote site of a local-remote telerobotic system which is being developed for NASA for space applications, in particular Space Station Freedom applications. The system is being developed to provide control and supervised autonomous control to support both space based operation and ground-remote control with time delay. The local-remote architecture places task planning responsibilities at the local site and task execution responsibilities at the remote site. This separation allows the remote site to be designed to optimize task execution capability within a limited computational environment such as is expected in flight systems. The local site task planning system could be placed on the ground where few computational limitations are expected. MOTES is written in the Ada programming language for a multiprocessor environment.
Sustainability and transformation plans: translating the perspectives.
Thakrar, Sonali V; Bell, Diane
2017-10-02
Each local health economy has been tasked with producing a sustainability and transformation plan. A health economy is a system that controls and contributes to health-care resource and the effects of health services on its population. This includes commissioners, acute providers, primary care providers, community services, public health and the voluntary sector. Sustainability and transformation plans represent a shift in the way health care is planned for in England. The aim of each sustainability and transformation plan is to deliver care within existing resource limits by improving quality of care, developing new models of care and improving efficiency of care provision. The tight timescales for production of sustainability and transformation plans mean that in most cases there has been limited clinical engagement; as a result many clinicians have limited sight, understanding or ownership of the proposals within sustainability and transformation plans. As sustainability and transformation plans move into the implementation phase, this article explores the role of the clinician in the ongoing design and delivery of the local sustainability and transformation plans. By finding the common ground between the perspectives of the clinician, the commissioner and system leaders, the motivation of clinicians can be aligned with the ambitions of the sustainability and transformation plan. The common goal of a sustainability and transformation plan and the necessary collaboration required to make it successful is discussed. Ultimately, such translation is essential: clinicians are intelligent, adaptive and motivated individuals who must have a lead role in constructing and implementing plans that transform health and social care.
NASA Astrophysics Data System (ADS)
Chaudhary, B. S.
Remote Sensing as the term signifies is the technique of gathering information about an object or surface phenomenon without being in physical contact with it and essentially by using electromagnetic radiation. The principle of remote sensing is based on the solar radiation reflected or emitted from the surface of the earth. As different objects behave differently for the incoming solar radiation and have different thermal properties, the amount of solar radiation reflected, absorbed or emitted is also different. GIS is defined as an information system that is used to input, store, retrieve, manipulate, analyze and output geographically referenced data or geospatial data in order to support decision making for planning and management of natural resources. It has four essential components - hardware, software, geospatial data and the users. GIS is needed because of some inherent demerits in the manual methods. The conventional methods of surveying and mapping are time consuming, labour intensive and tedious. The techniques of Remote Sensing (RS) and GIS are effective in timely and efficient generation of database of various resources. The synoptic view and multi resolution satellite data is helpful in generating information at various scales. The mapping and monitoring of dynamic phenomenon such as floods, water logging, deforestation can be done very effectively with the aid of RS and GIS. The effective planning for water resources conservation and management at district level can be made if the data is generated on 1:50,000 scale. Hydrogeomorphological maps on 1:50,000 scale showing different ground water prospect zones have been prepared for different districts in Haryana State, India. This information has been supplemented with the available inputs from existing sources about the depth to water level and ground water quality. The other maps prepared under National (Natural) Resources Information System (NRIS) such as land use/ land cover, geomorphology, drainage/ canal network and soils etc have also been consulted for preparing water resources action plan. The maps thus prepared depict different units for further ground water prospecting. It is to mention here that some of the Palaeo-channels have been picked up first time. Various sites has been suggested for site specific water resources conservation measures such check dams/ gully plugging, earthen dams etc for recharging the ground water. The information thus developed has been submitted to PWD (Public Health) Department, Govt. of Haryana as well as other district agencies involved in the planning and management of natural resources, for further implementation of the activities suggested in different areas. During visit to different areas, it was found that the water resources action plans suggested are being implemented in the field to its maximum possibility both in the direction of fresh ground water areas exploration as well as water resources conservation. The ground water in the areas suggested is being recharged and the people are taking good crops.
Context awareness and sensitivity in SEA implementation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hilding-Rydevik, Tuija; Bjarnadottir, Holmfridur
2007-10-15
The Impact Assessment research community repeatedly asserts that the implementation of Strategic Environmental Assessment (SEA) should take the issue of context into consideration. The primary aim of this paper then is to attempt to give substance to the concept of 'context' in relation to the implementation of SEA. The second aim is to discuss the relevance of context consciousness and sensitivity in relation to one of the main aims given to SEA implementation i.e. to contribute to the 'integration' of environmental perspectives in planning processes. Context must be defined in relation to a certain question. In this paper the questionmore » in focus is the assumption that SEA implementation will contribute to integration of environmental issues in planning processes. Research results relating to the use of environmental tools, like for example SEA, and experiences of integration efforts, strongly indicate that the use of a single tool like SEA is not enough to achieve this integration. The current 'context free' normative and procedural assumptions concerning the aim of SEA implementation and 'best practice' in term of SEA can be criticised on the same grounds as normative and procedural planning theories, as being context free. The assumptions behind the current formulations of the aim and best practice of SEA need to be revisited. A firm empirical and theoretical knowledge and discussion is needed, especially in relation to the issue of context and integration. This paper provides a starting point in this direction.« less
NASA Technical Reports Server (NTRS)
Dorais, Gregory A.; Nicewarner, Keith
2006-01-01
We present an multi-agent model-based autonomy architecture with monitoring, planning, diagnosis, and execution elements. We discuss an internal spacecraft free-flying robot prototype controlled by an implementation of this architecture and a ground test facility used for development. In addition, we discuss a simplified environment control life support system for the spacecraft domain also controlled by an implementation of this architecture. We discuss adjustable autonomy and how it applies to this architecture. We describe an interface that provides the user situation awareness of both autonomous systems and enables the user to dynamically edit the plans prior to and during execution as well as control these agents at various levels of autonomy. This interface also permits the agents to query the user or request the user to perform tasks to help achieve the commanded goals. We conclude by describing a scenario where these two agents and a human interact to cooperatively detect, diagnose and recover from a simulated spacecraft fault.
CNES Strategic Plan for Space Traffic Control
NASA Astrophysics Data System (ADS)
Alby, Fernand
2013-09-01
The increasing orbital debris population represents a growing risk to operational satellites on-orbit and also to populations and properties on-ground. Today available space surveillance data allow a better implementation of protection activities which are now part of operational services. The overall frame of these activities at CNES is given by a strategic plan defining the long term views and the corresponding activities to be carried out during the next years. This plan, established in close cooperation with French Defence organizations, includes, among others, two operational space traffic control activities: prevention of on-orbit collisions and atmospheric re-entries predictions.This paper presents first the national organization relative to these activities together with the internal CNES process starting from a high level roadmap, up to a detailed action plan. This plan contains operational activities and supporting studies and models development.The content of this plan is given with a focus on operational activities dealing with space traffic control.
The Columbus logistics support at the APMC: Requirements and implementation aspects
NASA Technical Reports Server (NTRS)
Canu, C.; Battocchio, L.; Masullo, S.
1993-01-01
This paper focuses on the logistics support to be provided by the APM Center (APMC). Among the Columbus ground infrastructures, this center is tasked to provide logistics, sustaining engineering and P/L integration support to the ongoing missions of the APM, i.e. the Columbus Laboratory attached to the Freedom Space Station. The following is illustrated: an analysis of the requirements that are levied on the logistics support of the APM; how such requirements are reflected in the corresponding support to be available on-ground and at APMC; the functional components of the APMC logistics support and how such components interact each other; how the logistics support function interfaces with the other functions of the ground support; and how the logistics support is being designed in terms of resources (such as hardware, data bases, etc.). Emphasis is given to the data handling aspects and to the related data bases that will constitute for the logistics activities the fundamental source of information during the APM planned lifetime. Functional and physical architectures, together with trades for possible implementation, are addressed. Commonalities with other centers are taken into account and recommendations are made for possible reuse of tools already developed in the C/D phase. Finally, programmatic considerations are discussed for the actual implementation of the center.
Implementing community-based education in basic nursing education programs in South Africa.
Mtshali, N G
2009-03-01
Education of health professionals using principles of community-based education is the recommended national policy in South Africa. A paradigm shift to community-based education is reported in a number of nursing education institutions in South Africa. Reviewed literature however revealed that in some educational institutions planning, implementation and evaluation of Community-based Educational (CBE) programmes tended to be haphazard, uncoordinated and ineffective, resulting in poor student motivation. Therefore the purpose of this study was to analyse the implementation of community-based education in basic nursing education programmes in South Africa. Strauss and Corbin's (1990) grounded theory approach guided the research process. Data were collected by means of observation, interviews and document analysis. The findings revealed that collaborative decision-making involving all stakeholders was crucial especially during the curriculum planning phase. Furthermore, special criteria should be used when selecting community learning sites to ensure that the selected sites are able to facilitate the development of required graduate competencies. Collaborative effort, true partnership between academic institutions and communities, as well as government support and involvement emerged as necessary conditions for the successful implementation of community-based education programmes.
Engineering management consideration for an integrated aeronautical mobile satellite service
NASA Astrophysics Data System (ADS)
Belcher, John M.
In order to meet local air traffic control terminal requirements as well as national and transborder requirements, countries have developed communications, navigation, and surveillance (CNS) systems having little systems integration and a solely ground-based solution to air traffic control problems. It is believed that the application of satellite technology is the only currently viable solution that will enable international civil aviation to overcome the shortcomings of the presently available CNS systems. If properly implemented, available satellite system technology integrated with avionics and ground based capabilities, can be used to meet new global aviation demands. A clear transition plan has to be implemented so as to ensure continuity of service, recognize user-borne costs, and satisfy institutional and national objectives in the progress toward a universal air traffic management (ATM) system. ATM systems design should rely on a modular approach for flexibility and upgrading. An aeronautical mobile satellite service is intended to provide a worldwide satellite data link and direct air/ground voice communication. Institutional and financial roadblocks for implemetation of a global based approach will likely be far greater than technical constraints.
United States Marine Corps Expeditionary Energy Strategy and Implementation Plan
2011-02-01
Support System (NTCSS, OOMA/OIMA), and Aircraft Inventory Readiness and Reporting System (AIRRS) data in the Naval Aviation Logistics Data Analysis...Corps’ share is used for operational purposes—fuel for training, moving and sustaining our forces, aircraft and weapons platforms .1 Within this, and...this 75% was consumed by ‘ground forces,’ which includes use by vehicles, generators, and other sustainment equipment . Aircraft consumed
Object schemas for grounding language in a responsive robot
NASA Astrophysics Data System (ADS)
Hsiao, Kai-Yuh; Tellex, Stefanie; Vosoughi, Soroush; Kubat, Rony; Roy, Deb
2008-12-01
An approach is introduced for physically grounded natural language interpretation by robots that reacts appropriately to unanticipated physical changes in the environment and dynamically assimilates new information pertinent to ongoing tasks. At the core of the approach is a model of object schemas that enables a robot to encode beliefs about physical objects in its environment using collections of coupled processes responsible for sensorimotor interaction. These interaction processes run concurrently in order to ensure responsiveness to the environment, while co-ordinating sensorimotor expectations, action planning and language use. The model has been implemented on a robot that manipulates objects on a tabletop in response to verbal input. The implementation responds to verbal requests such as 'Group the green block and the red apple', while adapting in real time to unexpected physical collisions and taking opportunistic advantage of any new information it may receive through perceptual and linguistic channels.
The Aspin Plan: A Resource Allocation Strategy for Today
1993-04-15
Subs." Wall Street Journal, 6 May 1992, p. A4. Roos, John G. "$59-Billion Armor Mod Plan Has Only One Tread on Ground". Armed Forces Journal...2i Pxa e R~C40 HAPILL,? 61TL..T1t& jaa C-ALMSLf-I ’PR 1-70 3-SOS- 6 _ _ _ _ _ _ _ _ _ _ _ _ _ _ 3a. VJ.AME OF ý!JNDINGiSON,1SOR!tNG 308c OfC.. "’M3OL...accepted and implemented in a timely manner. In February 1992 Les Aspin, former Chairman of the House Armed Services Committee, outlined a resource
We Must Take the Next Steps Towards Safe, Routine Space Travel
NASA Technical Reports Server (NTRS)
Lyles, G. M.
2000-01-01
This paper presents, in viewgraph form, six in a half generations of airplanes in a century. Some of the topics include: 1) Enterprise goals; 2) Generations of Reusable Launch Vehicles; 3) Space Transportation Across NASA; 4) Three Tiered Implementation Approach for Future Space Transportation Technology; 5) Develop a Comprehensive, Agency Level Space Transportation Plan That Will Enable NASA's Strategic Plan; 6) Timeline for Addressing NASA's Needs; 7) Significant 2nd Generation Technology Drivers; 8) Example Large Scale Ground Demonstrations; and 9) Example Pathfinder Demonstrations. The paper also includes various aircraft designs and propulsion system technology.
An Architecture to Enable Autonomous Control of Spacecraft
NASA Technical Reports Server (NTRS)
May, Ryan D.; Dever, Timothy P.; Soeder, James F.; George, Patrick J.; Morris, Paul H.; Colombano, Silvano P.; Frank, Jeremy D.; Schwabacher, Mark A.; Wang, Liu; LawLer, Dennis
2014-01-01
Autonomy is required for manned spacecraft missions distant enough that light-time communication delays make ground-based mission control infeasible. Presently, ground controllers develop a complete schedule of power modes for all spacecraft components based on a large number of factors. The proposed architecture is an early attempt to formalize and automate this process using on-vehicle computation resources. In order to demonstrate this architecture, an autonomous electrical power system controller and vehicle Mission Manager are constructed. These two components are designed to work together in order to plan upcoming load use as well as respond to unanticipated deviations from the plan. The communication protocol was developed using "paper" simulations prior to formally encoding the messages and developing software to implement the required functionality. These software routines exchange data via TCP/IP sockets with the Mission Manager operating at NASA Ames Research Center and the autonomous power controller running at NASA Glenn Research Center. The interconnected systems are tested and shown to be effective at planning the operation of a simulated quasi-steady state spacecraft power system and responding to unexpected disturbances.
Cross Support Transfer Service (CSTS) Framework Library
NASA Technical Reports Server (NTRS)
Ray, Timothy
2014-01-01
Within the Consultative Committee for Space Data Systems (CCSDS), there is an effort to standardize data transfer between ground stations and control centers. CCSDS plans to publish a collection of transfer services that will each address the transfer of a particular type of data (e.g., tracking data). These services will be called Cross Support Transfer Services (CSTSs). All of these services will make use of a common foundation that is called the CSTS Framework. This library implements the User side of the CSTS Framework. "User side" means that the library performs the role that is typically expected of the control center. This library was developed in support of the Goddard Data Standards program. This technology could be applicable for control centers, and possibly for use in control center simulators needed to test ground station capabilities. The main advantages of this implementation are its flexibility and simplicity. It provides the framework capabilities, while allowing the library user to provide a wrapper that adapts the library to any particular environment. The main purpose of this implementation was to support the inter-operability testing required by CCSDS. In addition, it is likely that the implementation will be useful within the Goddard mission community (for use in control centers).
Childhood Asthma Disparities in Chicago: Developing Approaches to Health Inequities.
Martin, Molly A; Kapheim, Melissa Gutierrez; Erwin, Kim; Ignoffo, Stacy; McMahon, Kate; OʼRourke, Amy; Gerald, Lynn B; Barrett, Meredith; Press, Valerie G; Darabi, Houshang; Krishnan, Jerry A
We conducted a needs assessment to develop an evidence-based, locally tailored asthma care implementation plan for high-risk children with asthma in Chicago. Our team of health policy experts, clinicians, researchers, and designers included extensive stakeholder engagement (N = 162) in a mixed-methods community needs assessment. Results showed the lines of communication and collaboration across sectors were weak; caregivers were the only consistent force and could not always manage this burden. A series of recommendations for interventions and how to implement and measure them were generated. Cooperative, multidisciplinary efforts grounded in the community can target wicked problems such as asthma.
EUROPA2: Plan Database Services for Planning and Scheduling Applications
NASA Technical Reports Server (NTRS)
Bedrax-Weiss, Tania; Frank, Jeremy; Jonsson, Ari; McGann, Conor
2004-01-01
NASA missions require solving a wide variety of planning and scheduling problems with temporal constraints; simple resources such as robotic arms, communications antennae and cameras; complex replenishable resources such as memory, power and fuel; and complex constraints on geometry, heat and lighting angles. Planners and schedulers that solve these problems are used in ground tools as well as onboard systems. The diversity of planning problems and applications of planners and schedulers precludes a one-size fits all solution. However, many of the underlying technologies are common across planning domains and applications. We describe CAPR, a formalism for planning that is general enough to cover a wide variety of planning and scheduling domains of interest to NASA. We then describe EUROPA(sub 2), a software framework implementing CAPR. EUROPA(sub 2) provides efficient, customizable Plan Database Services that enable the integration of CAPR into a wide variety of applications. We describe the design of EUROPA(sub 2) from the perspective of both modeling, customization and application integration to different classes of NASA missions.
47 CFR 22.857 - Channel plan for commercial aviation air-ground systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 2 2013-10-01 2013-10-01 false Channel plan for commercial aviation air-ground... CARRIER SERVICES PUBLIC MOBILE SERVICES Air-Ground Radiotelephone Service Commercial Aviation Air-Ground Systems § 22.857 Channel plan for commercial aviation air-ground systems. The 849-851 MHz and 894-896 MHz...
47 CFR 22.857 - Channel plan for commercial aviation air-ground systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 2 2014-10-01 2014-10-01 false Channel plan for commercial aviation air-ground... CARRIER SERVICES PUBLIC MOBILE SERVICES Air-Ground Radiotelephone Service Commercial Aviation Air-Ground Systems § 22.857 Channel plan for commercial aviation air-ground systems. The 849-851 MHz and 894-896 MHz...
47 CFR 22.857 - Channel plan for commercial aviation air-ground systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 2 2012-10-01 2012-10-01 false Channel plan for commercial aviation air-ground... CARRIER SERVICES PUBLIC MOBILE SERVICES Air-Ground Radiotelephone Service Commercial Aviation Air-Ground Systems § 22.857 Channel plan for commercial aviation air-ground systems. The 849-851 MHz and 894-896 MHz...
47 CFR 22.857 - Channel plan for commercial aviation air-ground systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 2 2011-10-01 2011-10-01 false Channel plan for commercial aviation air-ground... CARRIER SERVICES PUBLIC MOBILE SERVICES Air-Ground Radiotelephone Service Commercial Aviation Air-Ground Systems § 22.857 Channel plan for commercial aviation air-ground systems. The 849-851 MHz and 894-896 MHz...
The Telecommunications and Data Acquisition Report
NASA Technical Reports Server (NTRS)
Posner, Edward C. (Editor)
1993-01-01
Reports on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA) are provided. In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DSN) in planning, supporting research and technology, implementation, and operations. Also included are standards activity at JPL for space data and information systems and reimbursable DSN work performed for other agencies through NASA.
The Telecommunications and Data Acquisition Report
NASA Technical Reports Server (NTRS)
Yuen, Joseph H. (Editor)
1994-01-01
Reports on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA) are provided. In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DSN) in planning, supporting research and technology, implementation, and operations. Also included are standards activity at JPL for space data and information systems and reimbursable DSN work performed for other agencies through NASA.
Adiabatic Quantum Computing with Neutral Atoms
NASA Astrophysics Data System (ADS)
Hankin, Aaron; Biedermann, Grant; Burns, George; Jau, Yuan-Yu; Johnson, Cort; Kemme, Shanalyn; Landahl, Andrew; Mangan, Michael; Parazzoli, L. Paul; Schwindt, Peter; Armstrong, Darrell
2012-06-01
We are developing, both theoretically and experimentally, a neutral atom qubit approach to adiabatic quantum computation. Using our microfabricated diffractive optical elements, we plan to implement an array of optical traps for cesium atoms and use Rydberg-dressed ground states to provide a controlled atom-atom interaction. We will develop this experimental capability to generate a two-qubit adiabatic evolution aimed specifically toward demonstrating the two-qubit quadratic unconstrained binary optimization (QUBO) routine.
The ADEPT Framework for Intelligent Autonomy
NASA Technical Reports Server (NTRS)
Ricard, Michael; Kolitz, Stephan
2003-01-01
This paper describes the design and implementation of Draper Laboratory's All-Domain Execution and Planning Technology (ADEPT) architecture for intelligent autonomy. Intelligent autonomy is the ability to plan and execute complex activities in a manner that provides rapid, effective response to stochastic and dynamic mission events. Thus, intelligent autonomy enables the high-level reasoning and adaptive behavior for an unmanned vehicle that is provided by an operator in man-in-the-loop systems. Draper s intelligent autonomy has architecture evolved over a decade and a half beginning in the mid 1980's culminating in an operational experiment funded under DARPA's Autonomous Minehunting and Mapping Technologies (AMMT) unmanned undersea vehicle program. ADEPT continues to be refined through its application to current programs that involve air vehicles, satellites and higher-level planning used to direct multiple vehicles. The objective of ADEPT is to solidify a proven, dependable software approach that can be quickly applied to new vehicles and domains. The architecture can be viewed as a hierarchical extension of the sense-think-act paradigm of intelligence and has strong parallels with the military's Observe-Orient-Decide-Act (OODA) loop. The key elements of the architecture are planning and decision-making nodes comprising modules for situation assessment, plan generation, plan implementation and coordination. A reusable, object-oriented software framework has been developed that implements these functions. As the architecture is applied to new areas, only the application specific software needs to be developed. This paper describes the core architecture in detail and discusses how this has been applied in the undersea, air, ground and space domains.
Using GIS and Ahp for Planning Primer Transportation of Forest Products
NASA Astrophysics Data System (ADS)
Akay, A. E.; Yılmaz, B.
2017-11-01
Primer transportation is one of the most costly and time consuming forestry activities in extraction of timber from forest lands. Transportation methods are essentially determined based on terrain characteristics, especially ground slope. Besides, unsuitable machine selection and unplanned operations may cause ecological damages such as soil disturbance. Soil damage can lead to long term impacts on forest ecosystem. Thus, the optimum transportation methods should be determined by considering not only economic factors but also topographical factors and soil conditions. In recent decades, some of the advanced features of Geographical Information System (GIS) assist decision makers to solve such complex transportation problems with various constraints. In this study, it was aimed to plan forest transportation operation by using GIS integrated Analytical Hierarchy Process (AHP) method, considering ground slope, soil type, and available transportation equipment in the region. This method was implemented within the border of İnegöl Forest Enterprise Chief in the city of Bursa in Turkey. Alternative transportation method included cable system, chute system, skidder, and farm tractor. GIS-based method integrated with AHP found that skidder was the optimal transportation method for about 60% of the study area, while farm tractor was the second most suitable method with 25% ground cover. The results indicated that GIS-based decision support systems can be effectively used as rational, quick, and economic tool for forest transportation planning.
Sensor planning for moving targets
NASA Astrophysics Data System (ADS)
Musman, Scott A.; Lehner, Paul; Elsaesser, Chris
1994-10-01
Planning a search for moving ground targets is difficult for humans and computationally intractable. This paper describes a technique to solve such problems. The main idea is to combine probability of detection assessments with computational search heuristics to generate sensor plans which approximately maximize either the probability of detection or a user- specified knowledge function (e.g., determining the target's probable destination; locating the enemy tanks). In contrast to super computer-based moving target search planning, our technique has been implemented using workstation technology. The data structures generated by sensor planning can be used to evaluate sensor reports during plan execution. Our system revises its objective function with each sensor report, allowing the user to assess both the current situation as well as the expected value of future information. This capability is particularly useful in situations involving a high rate of sensor reporting, helping the user focus his attention on sensors reports most pertinent to current needs. Our planning approach is implemented in a three layer architecture. The layers are: mobility analysis, followed by sensor coverage analysis, and concluding with sensor plan analysis. It is possible using these layers to describe the physical, spatial, and temporal characteristics of a scenario in the first two layers, and customize the final analysis to specific intelligence objectives. The architecture also allows a user to customize operational parameters in each of the three major components of the system. As examples of these performance options, we briefly describe the mobility analysis and discuss issues affecting sensor plan analysis.
Path Planning Algorithms for Autonomous Border Patrol Vehicles
NASA Astrophysics Data System (ADS)
Lau, George Tin Lam
This thesis presents an online path planning algorithm developed for unmanned vehicles in charge of autonomous border patrol. In this Pursuit-Evasion game, the unmanned vehicle is required to capture multiple trespassers on its own before any of them reach a target safe house where they are safe from capture. The problem formulation is based on Isaacs' Target Guarding problem, but extended to the case of multiple evaders. The proposed path planning method is based on Rapidly-exploring random trees (RRT) and is capable of producing trajectories within several seconds to capture 2 or 3 evaders. Simulations are carried out to demonstrate that the resulting trajectories approach the optimal solution produced by a nonlinear programming-based numerical optimal control solver. Experiments are also conducted on unmanned ground vehicles to show the feasibility of implementing the proposed online path planning algorithm on physical applications.
ARGOS - the Laser Star Adaptive Optics for LBT
NASA Astrophysics Data System (ADS)
Rabien, S.; Barl, L.; Beckmann, U.; Blümchen, T.; Bonaglia, M.; Borelli, J. L.; Brynnel, J.; Busoni, L.; Carbonaro, L.; Conot, C.; Davies, R.; Deysenroth, M.; Durney, O.; Elberich, M.; Esposito, S.; Gasho, V.; Gässler, W.; Gemperlein, H.; Genzel, R.; Green, R.; Haug, M.; Lloyd Hart, M.; Hubbard, P.; Kanneganti, S.; Kulas, M.; Noenickx, J.; Peter, D.; Quirrenbach, A.; Rademacher, M.; Rix, H. W.; Salinari, P.; Schwab, C.; Storm, J.; Strüder, L.; Thiel, M.; Weigelt, G.; Ziegleder, J.; Orban de Xivry, G.
2011-09-01
We will present the design and status of ARGOS - the Laser Guide Star adaptive optics facility for the Large Binocular Telescope. By projecting a constellation of multiple laser guide stars above each of the 8.4m primary mirrors of the LBT, ARGOS in its ground layer mode will enable a wide field adaptive optics correction for multi object spectroscopy. ARGOS implements high power pulsed green lasers and makes use of Rayleigh scattering for the guide star creation. The geometric relations of this setup in guide star height vs. primary diameter are quite comparable to an ELT with sodium guide stars. The use of LBT's adaptive secondary mirror, gated wavefront sensors, a prime focus calibration system and the laser constellation shows several aspects that may be used as pathfinding technology for the planned ELTs. In already planned upgrade steps with a hybrid Sodium-Rayleigh combination ARGOS will enable MCAO and MOAO implementations at LBT allowing unique astronomical observations.
Rivera-Holguin, Miryam; Velazquez, Tesania; Custodio, Elba; Corveleyn, Jozef
2018-01-01
This study describes a model to intervene in communities affected by the political violence impacting the Ayacucho region of Peru since 1980s. Many community members still experience psychosocial consequences to this day due primarily to grief. Thirty-eight professionals from different sectors in the area received specialized training and implemented five community projects that were accompanied and monitored in the field by a team of community psychologists. This article is grounded on the principles of participation, building community capacity, and community strengthening. We present the analysis of five community action plans implemented over a period of 14 months. The results show a process of internal strengthening of community services and the identification of new social and community resources among the people involved in the action plans. The implications of capacity building for improving community mental health are discussed.
Reengineering the Project Design Process
NASA Technical Reports Server (NTRS)
Casani, E.; Metzger, R.
1994-01-01
In response to NASA's goal of working faster, better and cheaper, JPL has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center and the Flight System Testbed. Reengineering at JPL implies a cultural change whereby the character of its design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and cost estimating.
Kennedy Space Center Orion Processing Team Planning for Ground Operations
NASA Technical Reports Server (NTRS)
Letchworth, Gary; Schlierf, Roland
2011-01-01
Topics in this presentation are: Constellation Ares I/Orion/Ground Ops Elements Orion Ground Operations Flow Orion Operations Planning Process and Toolset Overview, including: 1 Orion Concept of Operations by Phase 2 Ops Analysis Capabilities Overview 3 Operations Planning Evolution 4 Functional Flow Block Diagrams 5 Operations Timeline Development 6 Discrete Event Simulation (DES) Modeling 7 Ground Operations Planning Document Database (GOPDb) Using Operations Planning Tools for Operability Improvements includes: 1 Kaizen/Lean Events 2 Mockups 3 Human Factors Analysis
Implementing the President's Vision: JPL and NASA's Exploration Systems Mission Directorate
NASA Technical Reports Server (NTRS)
Sander, Michael J.
2006-01-01
As part of the NASA team the Jet Propulsion Laboratory is involved in the Exploration Systems Mission Directorate (ESMD) work to implement the President's Vision for Space exploration. In this slide presentation the roles that are assigned to the various NASA centers to implement the vision are reviewed. The plan for JPL is to use the Constellation program to advance the combination of science an Constellation program objectives. JPL's current participation is to contribute systems engineering support, Command, Control, Computing and Information (C3I) architecture, Crew Exploration Vehicle, (CEV) Thermal Protection System (TPS) project support/CEV landing assist support, Ground support systems support at JSC and KSC, Exploration Communication and Navigation System (ECANS), Flight prototypes for cabin atmosphere instruments
NASA Technical Reports Server (NTRS)
1972-01-01
The planning data are presented for subsequent phases of free-flying teleoperator program (FFTO) and includes costs, schedules and supporting research and technology activities required to implement the free-flying teleoperator system and associated flight equipment. The purpose of the data presented is to provide NASA with the information needed to continue development of the FFTO and integrate it into the space shuttle program. The planning data describes three major program phases consisting of activities and events scheduled to effect integrated design, development, fabrication and operation of an FFTO system. Phase A, Concept Generation, represents a study effort directed toward generating and evaluating a number of feasible FFTO experiment system concepts. Phase B, Definition, will include preliminary design and supporting analysis of the FFTO, the shuttle based equipment and ground support equipment. Phase C/D, Design, Development and Operations will include detail design of the operational FFTO, its integration into the space shuttle, hardware fabrication and testing, delivery of flight hardware and support of flight operations. Emphasis is placed on the planning for Phases A and B since these studies will be implemented early in the development cycle. Phase C/D planning is more general and subject to refinement during the definition phase.
A Framework for Dimensioning VDL-2 Air-Ground Networks
NASA Technical Reports Server (NTRS)
Ribeiro, Leila Z.; Monticone, Leone C.; Snow, Richard E.; Box, Frank; Apaza, Rafel; Bretmersky, Steven
2014-01-01
This paper describes a framework developed at MITRE for dimensioning a Very High Frequency (VHF) Digital Link Mode 2 (VDL-2) Air-to-Ground network. This framework was developed to support the FAA's Data Communications (Data Comm) program by providing estimates of expected capacity required for the air-ground network services that will support Controller-Pilot-Data-Link Communications (CPDLC), as well as the spectrum needed to operate the system at required levels of performance. The Data Comm program is part of the FAA's NextGen initiative to implement advanced communication capabilities in the National Airspace System (NAS). The first component of the framework is the radio-frequency (RF) coverage design for the network ground stations. Then we proceed to describe the approach used to assess the aircraft geographical distribution and the data traffic demand expected in the network. The next step is the resource allocation utilizing optimization algorithms developed in MITRE's Spectrum ProspectorTM tool to propose frequency assignment solutions, and a NASA-developed VDL-2 tool to perform simulations and determine whether a proposed plan meets the desired performance requirements. The framework presented is capable of providing quantitative estimates of multiple variables related to the air-ground network, in order to satisfy established coverage, capacity and latency performance requirements. Outputs include: coverage provided at different altitudes; data capacity required in the network, aggregated or on a per ground station basis; spectrum (pool of frequencies) needed for the system to meet a target performance; optimized frequency plan for a given scenario; expected performance given spectrum available; and, estimates of throughput distributions for a given scenario. We conclude with a discussion aimed at providing insight into the tradeoffs and challenges identified with respect to radio resource management for VDL-2 air-ground networks.
76 FR 48881 - Recovery Plan for the Endangered Pyne's Ground-plum (Astragalus bibullatus
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-09
...] Recovery Plan for the Endangered Pyne's Ground-plum (Astragalus bibullatus) AGENCY: Fish and Wildlife..., announce the availability of the final recovery plan for Pyne's ground-plum (Astragalus bibullatus), a... Pyne's ground-plum as an endangered species under the Act (16 U.S.C. 1531 et seq.), on September 26...
Continuity of Operations Planning (COOP): A Strategy for Implementation
2005-03-18
5050 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/ MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR/MONITOR’S ACRONYM(S) 11. SPONSOR...a position of building an alternate command and control site from ground zero , with little time or thought going into the functions, capacities and...above, there are two other approaches available to leaders in selecting a site. One option is to allow employees to telecommute and work from home
The Telecommunications and Data Acquisition Report
NASA Technical Reports Server (NTRS)
Posner, E. C. (Editor)
1993-01-01
This quarterly publication provides archival reports on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA). In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DSN) in planning, supporting research and technology, implementation, and operations. Also included are standards activity at JPL for space data and information systems and reimbursable DSN work performed for other space agencies through NASA.
Small planetary mission plan: Report to Congress
NASA Technical Reports Server (NTRS)
1992-01-01
This document outlines NASA's small planetary projects plan within the context of overall agency planning. In particular, this plan is consistent with Vision 21: The NASA Strategic Plan, and the Office of Space Science and Applications (OSSA) Strategic Plan. Small planetary projects address focused scientific objectives using a limited number of mature instruments, and are designed to require little or no new technology development. Small missions can be implemented by university and industry partnerships in coordination with a NASA Center to use the unique services the agency provides. The timeframe for small missions is consistent with academic degree programs, which makes them an excellent training ground for graduate students and post-doctoral candidates. Because small missions can be conducted relatively quickly and inexpensively, they provide greater opportunity for increased access to space. In addition, small missions contribute to sustaining a vital scientific community by increasing the available opportunities for direct investigator involvement from just a few projects in a career to many.
Contingency plan to provide safe drinking water for the city of Milan, Tennessee
DOE Office of Scientific and Technical Information (OSTI.GOV)
Talbot, J.J.; Brew, P.
1994-12-31
The city of Milan, in western Tennessee, supplies drinking water to approximately 4,000 customers. Environmental investigations conducted by the US Army have detected low concentrations of RDX, a compound used in the manufacture of explosives, in two of the three city water supply wells. The RDX is traceable to the Milan Army Ammunition Plant nearby. The levels of RDX are being monitored and current trends indicate that levels in the wells will exceed the EPA Health Advisory Limits in the near term. In order to ensure an uninterrupted supply of acceptable quality drinking water for the city residents, the Armymore » prepared and is implementing a Contingency Plan. The plan evaluated remedial alternatives to be implemented once a trigger level of RDX is reached, including institutional controls, installation of an RDX treatment system for the water supply system, and construction of a new well field. Institutional controls include: shutting down existing wells; continued monitoring; and promulgation of ground water ordinances. Treatment technologies evaluated include: ultraviolet light and hydrogen peroxide; or removal using granular activated carbon.« less
NASA Technical Reports Server (NTRS)
Beaton, Kara H.; Chappell, Steven P.; Bekdash, Omar S.; Gernhardt, Michael L.
2018-01-01
The NASA Next Space Technologies for Exploration Partnerships (NextSTEP) program is a public-private partnership model that seeks commercial development of deep space exploration capabilities to support extensive human spaceflight missions around and beyond cislunar space. NASA first issued the Phase 1 NextSTEP Broad Agency Announcement to U.S. industries in 2014, which called for innovative cislunar habitation concepts that leveraged commercialization plans for low Earth orbit. These habitats will be part of the Deep Space Gateway (DSG), the cislunar space station planned by NASA for construction in the 2020s. In 2016, Phase 2 of the NextSTEP program selected five commercial partners to develop ground prototypes. A team of NASA research engineers and subject matter experts have been tasked with developing the ground test protocol that will serve as the primary means by which these Phase 2 prototype habitats will be evaluated. Since 2008, this core test team has successfully conducted multiple spaceflight analog mission evaluations utilizing a consistent set of operational products, tools, methods, and metrics to enable the iterative development, testing, analysis, and validation of evolving exploration architectures, operations concepts, and vehicle designs. The purpose of implementing a similar evaluation process for the NextSTEP Phase 2 Habitation Concepts is to consistently evaluate the different commercial partner ground prototypes to provide data-driven, actionable recommendations for Phase 3.
Masso, Malcolm; McCarthy, Grace; Kitson, Alison
2014-07-01
The context for the study was a nation-wide programme in Australia to implement evidence-based practice in residential aged care, in nine areas of practice, using a wide range of implementation strategies and involving 108 facilities. The study drew on the experiences of those involved in the programme to answer the question: what mechanisms influence the implementation of evidence-based practice in residential aged care and how do those mechanisms interact? The methodology used grounded theory from a critical realist perspective, informed by a conceptual framework that differentiates between the context, process and content of change. People were purposively sampled and invited to participate in semi-structured interviews, resulting in 44 interviews involving 51 people during 2009 and 2010. Participants had direct experience of implementation in 87 facilities, across nine areas of practice, in diverse locations. Sampling continued until data saturation was reached. The quality of the research was assessed using four criteria for judging trustworthiness: credibility, transferability, dependability and confirmability. Data analysis resulted in the identification of four mechanisms that accounted for what took place and participants' experiences. The core category that provided the greatest understanding of the data was the mechanism On Common Ground, comprising several constructs that formed a 'common ground' for change to occur. The mechanism Learning by Connecting recognised the ability to connect new knowledge with existing practice and knowledge, and make connections between actions and outcomes. Reconciling Competing Priorities was an ongoing mechanism whereby new practices had to compete with an existing set of constantly shifting priorities. Strategies for reconciling priorities ranged from structured approaches such as care planning to more informal arrangements such as conversations during daily work. The mechanism Exercising Agency bridged the gap between agency and action. It was the human dimension of change, both individually and collectively, that made things happen. The findings are consistent with the findings of others, but fit together in a novel way and add to current knowledge about how to improve practices in residential aged care. Each of the four mechanisms is necessary but none are sufficient for implementation to occur. Copyright © 2013 Elsevier Ltd. All rights reserved.
Autonomous Formation Flying from Ground to Flight
NASA Technical Reports Server (NTRS)
Chapman, Keith B.; Dell, Gregory T.; Rosenberg, Duane L.; Bristow, John
1999-01-01
The cost of on-orbit operations remains a significant and increasingly visible concern in the support of satellite missions. Headway has been made in automating some ground operations; however, increased mission complexity and more precise orbital constraints have compelled continuing human involvement in mission design and maneuver planning operations. AI Solutions, Inc. in cooperation with the National Aeronautics and Space Administration's (NASA) Goddard Space Flight Center (GSFC) has tackled these more complex problems through the development of AutoCon as a tool for an automated solution. NASA is using AutoCon to automate the maneuver planning for the Earth Orbiter-1 (EO-1) mission. AutoCon was developed originally as a ground system tool. The EO-1 mission will be using a scaled version of AutoCon on-board the EO-1 satellite to command orbit adjustment maneuvers. The flight version of AutoCon plans maneuvers based on formation flying algorithms developed by GSFC, JPL, and other industry partners. In its fully autonomous mode, an AutoCon planned maneuver will be executed on-board the satellite without intervention from the ground. This paper describes how AutoCon automates maneuver planning for the formation flying constraints of the EO-1 mission. AutoCon was modified in a number of ways to automate the maneuver planning on-board the satellite. This paper describes how the interface and functionality of AutoCon were modified to support the on-board system. A significant component of this modification was the implementation of a data smoother, based on a Kalman filter, that ensures that the spacecraft states estimated by an on-board GPS receiver are as accurate as possible for maneuver planning. This paper also presents the methodology use to scale the AutoCon functionality to fit and execute on the flight hardware. This paper also presents the modes built that allow the incremental phasing in of autonomy. New technologies for autonomous operations are usually received with significant, and probably appropriate trepidation. A number of safeguards have been designed in both AutoCon and the interfacing systems to alleviate the potential of mission-impacting anomalies from the on-board autonomous system. This paper describes the error checking, input data integrity validation and limits set on maneuvers in AutoCon and the on-board system.
Autonomous Formation Flying from the Ground to Flight
NASA Technical Reports Server (NTRS)
Chapman, Keith B.; Dell, Gregory T.; Rosenberg, Duane L.; Bristow, John
1999-01-01
The cost of on-orbit operations remains a significant and increasingly visible concern in the support of satellite missions. Headway has been made in automating some ground operations; however, increased mission complexity and more precise orbital constraints have compelled continuing human involvement in mission design and maneuver planning operations. AI Solutions, Inc. in cooperation with the National Aeronautics and Space Administration's (NASA) Goddard Space Flight Center (GSFC) has tackled these more complex problems through the development of AutoCon(TM) as a tool for an automated solution. NASA is using AutoCon(TM) to automate the maneuver planning for the Earth Orbiter-1 (EO-1) mission. AutoCon(TM) was developed originally as a ground system tool. The EO-1 mission will be using a scaled version of AutoCon(TM) on-board the EO-1 satellite to command orbit adjustment maneuvers. The flight version of AutoCon(TM) plans maneuvers based on formation flying algorithms developed by GSFC, JPL, and other industry partners. In its fully autonomous mode, an AutoCon(TM) planned maneuver will be executed on-board the satellite without intervention from the ground. This paper describes how AutoCon(TM) automates maneuver planning for the formation flying constraints of the EO-1 mission. AutoCon(TM) was modified in a number of ways to automate the maneuver planning on-board the satellite. This paper describes how the interface and functionality of AutoCon(TM) were modified to support the on-board system. A significant component of this modification was the implementation of a data smoother, based on a Kalman filter, that ensures that the spacecraft states estimated by an on-board GPS receiver are as accurate as possible for maneuver planning. This paper also presents the methodology used to scale the AutoCon(TM) functionality to fit and execute on the flight hardware. This paper also presents the modes built into the system that allow the incremental phasing in of autonomy. New technologies for autonomous operations are usually received with significant, and probably appropriate, trepidation. A number of safeguards have been designed in both AutoCon(TM) and the interfacing systems to alleviate the potential of mission-impacting anomalies from the on-board autonomous system. This paper describes the error checking, input data integrity validation, and limits set on maneuvers in AutoCon(TM) and the on-board system.
In-space propellant logistics. Volume 4: Project planning data
NASA Technical Reports Server (NTRS)
1972-01-01
The prephase A conceptual project planning data as it pertains to the development of the selected logistics module configuration transported into earth orbit by the space shuttle orbiter. The data represents the test, implementation, and supporting research and technology requirements for attaining the propellant transfer operational capability for early 1985. The plan is based on a propellant module designed to support the space-based tug with cryogenic oxygen-hydrogen propellants. A logical sequence of activities that is required to define, design, develop, fabricate, test, launch, and flight test the propellant logistics module is described. Included are the facility and ground support equipment requirements. The schedule of activities are based on the evolution and relationship between the R and T, the development issues, and the resultant test program.
Traffic routing in a switched regenerative satellite. Volume 1, task 3: Traffic assignment
NASA Astrophysics Data System (ADS)
1982-12-01
Time plan assignment in a multibeam SS-TDMA is discussed. System features fixed by the designer, such as the number and the speed of ground terminals installed in each station, and the number and the speed of satellite transponders working in each spot are described. Linkage among terminals and transponders is also discussed, including having more than one transponder linked to one terminal. A procedure to achieve a switching plan with high efficiency, taking into account all system constraints such as no bursts breaking and two transmission rates harmonization is proposed. Algorithms to be implemented are: the Hungarian method; branch and bound; the INSERT heuristic; and the HOLE heuristic. Computer programs were developed, and a time plan for a European Satellite System is produced.
Breaking ground in Tanzania. GO-NGO collaboration.
1998-05-01
JOICFP's reproductive health(RH)-oriented Integrated Project (IP) is being implemented by JOICFP's counterpart, the Family Planning Association of Tanzania (UMATI). The Japanese government usually provides support to help governmental programs. However, through this collaborative effort, the government of Japan is providing commodity and equipment assistance to support the RH/family planning and safe motherhood activities promoted by UMATI in collaboration with the Tanzanian government, with support provided through multilateral-bilateral assistance in collaboration with UNFPA. The Japanese government has agreed to provide US$170,000 annually in commodity and equipment assistance to the project over the period 1997-2000. The funds will be used to support family planning/maternal and child health clinics and dispensaries in project areas run by the government, as well as to support UMATI activities.
NASA Technical Reports Server (NTRS)
Haefner, L. E.
1975-01-01
Mathematical and philosophical approaches are presented for evaluation and implementation of ground and air transportation systems. Basic decision processes are examined that are used for cost analyses and planning (i.e, statistical decision theory, linear and dynamic programming, optimization, game theory). The effects on the environment and the community that a transportation system may have are discussed and modelled. Algorithmic structures are examined and selected bibliographic annotations are included. Transportation dynamic models were developed. Citizen participation in transportation projects (i.e, in Maryland and Massachusetts) is discussed. The relevance of the modelling and evaluation approaches to air transportation (i.e, airport planning) is examined in a case study in St. Louis, Missouri.
In-Space Networking on NASA's SCAN Testbed
NASA Technical Reports Server (NTRS)
Brooks, David E.; Eddy, Wesley M.; Clark, Gilbert J.; Johnson, Sandra K.
2016-01-01
The NASA Space Communications and Navigation (SCaN) Testbed, an external payload onboard the International Space Station, is equipped with three software defined radios and a flight computer for supporting in-space communication research. New technologies being studied using the SCaN Testbed include advanced networking, coding, and modulation protocols designed to support the transition of NASAs mission systems from primarily point to point data links and preplanned routes towards adaptive, autonomous internetworked operations needed to meet future mission objectives. Networking protocols implemented on the SCaN Testbed include the Advanced Orbiting Systems (AOS) link-layer protocol, Consultative Committee for Space Data Systems (CCSDS) Encapsulation Packets, Internet Protocol (IP), Space Link Extension (SLE), CCSDS File Delivery Protocol (CFDP), and Delay-Tolerant Networking (DTN) protocols including the Bundle Protocol (BP) and Licklider Transmission Protocol (LTP). The SCaN Testbed end-to-end system provides three S-band data links and one Ka-band data link to exchange space and ground data through NASAs Tracking Data Relay Satellite System or a direct-to-ground link to ground stations. The multiple data links and nodes provide several upgradable elements on both the space and ground systems. This paper will provide a general description of the testbeds system design and capabilities, discuss in detail the design and lessons learned in the implementation of the network protocols, and describe future plans for continuing research to meet the communication needs for evolving global space systems.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-01
...] Notice of Availability of a Technical Agency Draft Recovery Plan for Pyne's Ground-Plum (Astragalus... availability of the technical agency draft recovery plan for Pyne's ground-plum (Astragalus bibullatus), a...: Background We listed Pyne's ground-plum as an endangered species under the Act (16 U.S.C. 1531 et seq.), on...
Aircraft and Ground Vehicle Winter Runway Friction Assessment
NASA Technical Reports Server (NTRS)
Yager, Thomas J.
1999-01-01
Some background information is given together with the scope and objectives of a 5-year, Joint Winter Runway Friction Measurement Program between the National Aeronautics & Space Administration (NASA), Transport Canada (TC), and the Federal Aviation Administration (FAA). The primary objective of this effort is to perform instrumented aircraft and ground vehicle tests aimed at identifying a common number that all the different ground vehicle devices would report. This number, denoted the International Runway Friction Index (IRFI), will be related to all types of aircraft stopping performance. The range of test equipment, the test sites, test results and accomplishments, the extent of the substantial friction database compiled, and future test plans will be described. Several related studies have also been implemented including the effects of contaminant type on aircraft impingement drag, and the effectiveness of various runway and aircraft de-icing chemical types, and application rates.
NASA Technical Reports Server (NTRS)
Ray, David C.; Jelinsky, Sharon; Welsh, Barry Y.; Malina, Roger F.
1990-01-01
A stringent contamination-control plan has been developed for the optical components of the Extreme Ultraviolet Explorer instruments, whose performance in the 80-900 A wavelength range is highly sensitive to particulate and molecular contamination. The contamination-control program has been implemented over the last three years during assembly, test and calibration phases of the instrument. These phases have now been completed and the optics cavities of the instruments have been sealed until deployment in space. Various approaches are discussed which have been used during ground operations to meet optics' contamination goals within the project schedule and budget. The measured optical properties of EUV witness mirrors are also presented which remained with the flight mirrors during ground operations. These were used to track optical degradation due to contamination from the cleanroom and high-vacuum test-chamber environments.
NASA Technical Reports Server (NTRS)
Maldague, Pierre; Page, Dennis; Chase, Adam
2005-01-01
Activity Plan Generator (APGEN), now at version 5.0, is a computer program that assists in generating an integrated plan of activities for a spacecraft mission that does not oversubscribe spacecraft and ground resources. APGEN generates an interactive display, through which the user can easily create or modify the plan. The display summarizes the plan by means of a time line, whereon each activity is represented by a bar stretched between its beginning and ending times. Activities can be added, deleted, and modified via simple mouse and keyboard actions. The use of resources can be viewed on resource graphs. Resource and activity constraints can be checked. Types of activities, resources, and constraints are defined by simple text files, which the user can modify. In one of two modes of operation, APGEN acts as a planning expert assistant, displaying the plan and identifying problems in the plan. The user is in charge of creating and modifying the plan. In the other mode, APGEN automatically creates a plan that does not oversubscribe resources. The user can then manually modify the plan. APGEN is designed to interact with other software that generates sequences of timed commands for implementing details of planned activities.
2015-07-01
which were multiday electrical disruptions that occurred as a result of the June 2012 derecho storm, including a disruption at Marine Corps Base...we learned about were a multiday wastewater disruption at Fort Shafter and two electrical disruptions at Aberdeen Proving Ground. 35A derecho is a...D.C.: Jan. 31, 2014). At least seven Marine Corps and Navy installations experienced disruptions as a result of the derecho storm. They are Marine
JPRS Report, Near East & South Asia, Pakistan
1991-08-09
more specifically so long as it is well planned and well implemented; and Karachi’s and Hyderabad’s) cancerous eruptions of is preceded by reliable...is it rest of Pakistan. Unless we start to cure it, the cancer of a very distinctive or rare quality in this country. social violence shall spread...are numerous reports of smugglers operating in bail by the High Court on medical grounds. He was connivance with the FC, Customs, Levys and the PNCB
Plan Execution Interchange Language (PLEXIL)
NASA Technical Reports Server (NTRS)
Estlin, Tara; Jonsson, Ari; Pasareanu, Corina; Simmons, Reid; Tso, Kam; Verma, Vandi
2006-01-01
Plan execution is a cornerstone of spacecraft operations, irrespective of whether the plans to be executed are generated on board the spacecraft or on the ground. Plan execution frameworks vary greatly, due to both different capabilities of the execution systems, and relations to associated decision-making frameworks. The latter dependency has made the reuse of execution and planning frameworks more difficult, and has all but precluded information sharing between different execution and decision-making systems. As a step in the direction of addressing some of these issues, a general plan execution language, called the Plan Execution Interchange Language (PLEXIL), is being developed. PLEXIL is capable of expressing concepts used by many high-level automated planners and hence provides an interface to multiple planners. PLEXIL includes a domain description that specifies command types, expansions, constraints, etc., as well as feedback to the higher-level decision-making capabilities. This document describes the grammar and semantics of PLEXIL. It includes a graphical depiction of this grammar and illustrative rover scenarios. It also outlines ongoing work on implementing a universal execution system, based on PLEXIL, using state-of-the-art rover functional interfaces and planners as test cases.
Schneider, Jennifer L; Davis, James; Kauffman, Tia L; Reiss, Jacob A; McGinley, Cheryl; Arnold, Kathleen; Zepp, Jamilyn; Gilmore, Marian; Muessig, Kristin R; Syngal, Sapna; Acheson, Louise; Wiesner, Georgia L; Peterson, Susan K; Goddard, Katrina A B
2016-02-01
Evidence-based guidelines recommend that all newly diagnosed colon cancer be screened for Lynch syndrome (LS), but best practices for implementing universal tumor screening have not been extensively studied. We interviewed a range of stakeholders in an integrated health-care system to identify initial factors that might promote or hinder the successful implementation of a universal LS screening program. We conducted interviews with health-plan leaders, managers, and staff. Interviews were audio-recorded and transcribed. Thematic analysis began with a grounded approach and was also guided by the Practical Robust Implementation and Sustainability Model (PRISM). We completed 14 interviews with leaders/managers and staff representing involved clinical and health-plan departments. Although stakeholders supported the concept of universal screening, they identified several internal (organizational) and external (environment) factors that promote or hinder implementation. Facilitating factors included perceived benefits of screening for patients and organization, collaboration between departments, and availability of organizational resources. Barriers were also identified, including: lack of awareness of guidelines, lack of guideline clarity, staffing and program "ownership" concerns, and cost uncertainties. Analysis also revealed nine important infrastructure-type considerations for successful implementation. We found that clinical, laboratory, and administrative departments supported universal tumor screening for LS. Requirements for successful implementation may include interdepartmental collaboration and communication, patient and provider/staff education, and significant infrastructure and resource support related to laboratory processing and systems for electronic ordering and tracking.
Autonomous spacecraft maintenance study group
NASA Technical Reports Server (NTRS)
Marshall, M. H.; Low, G. D.
1981-01-01
A plan to incorporate autonomous spacecraft maintenance (ASM) capabilities into Air Force spacecraft by 1989 is outlined. It includes the successful operation of the spacecraft without ground operator intervention for extended periods of time. Mechanisms, along with a fault tolerant data processing system (including a nonvolatile backup memory) and an autonomous navigation capability, are needed to replace the routine servicing that is presently performed by the ground system. The state of the art fault handling capabilities of various spacecraft and computers are described, and a set conceptual design requirements needed to achieve ASM is established. Implementations for near term technology development needed for an ASM proof of concept demonstration by 1985, and a research agenda addressing long range academic research for an advanced ASM system for 1990s are established.
Young, John A.; Mahan, Carolyn G.; Forder, Melissa
2017-01-01
Many eastern forest communities depend on fire for regeneration or are enhanced by fire as a restoration practice. However, the use of prescribed fire in the mesic forested environments and the densely populated regions of the eastern United States has been limited. The objective of our research was to develop a science-based approach to prioritizing the use of prescribed fire in appropriate forest types in the eastern United States based on a set of desired management outcomes. Through a process of expert elicitation and data analysis, we assessed and integrated recent vegetation community mapping results along with other available spatial data layers into a spatial prioritization tool for prescribed fire planning at Shenandoah National Park (Virginia, USA). The integration of vegetation spatial data allowed for development of per-pixel priority rankings and exclusion areas enabling precise targeting of fire management activities on the ground, as well as a park-wide ranking of fire planning compartments. We demonstrate the use and evaluation of this approach through implementation and monitoring of a prescribed burn and show that progress is being made toward desired conditions. Integration of spatial data into the fire planning process has served as a collaborative tool for the implementation of prescribed fire projects, which assures projects will be planned in the most appropriate areas to meet objectives that are supported by current science.
Satellite servicing mission preliminary cost estimation model
NASA Technical Reports Server (NTRS)
1987-01-01
The cost model presented is a preliminary methodology for determining a rough order-of-magnitude cost for implementing a satellite servicing mission. Mission implementation, in this context, encompassess all activities associated with mission design and planning, including both flight and ground crew training and systems integration (payload processing) of servicing hardward with the Shuttle. A basic assumption made in developing this cost model is that a generic set of servicing hardware was developed and flight tested, is inventoried, and is maintained by NASA. This implies that all hardware physical and functional interfaces are well known and therefore recurring CITE testing is not required. The development of the cost model algorithms and examples of their use are discussed.
Hitchhiker mission operations: Past, present, and future
NASA Technical Reports Server (NTRS)
Anderson, Kathryn
1995-01-01
What is mission operations? Mission operations is an iterative process aimed at achieving the greatest possible mission success with the resources available. The process involves understanding of the science objectives, investigation of which system capabilities can best meet these objectives, integration of the objectives and resources into a cohesive mission operations plan, evaluation of the plan through simulations, and implementation of the plan in real-time. In this paper, the authors present a comprehensive description of what the Hitchhiker mission operations approach is and why it is crucial to mission success. The authors describe the significance of operational considerations from the beginning and throughout the experiment ground and flight systems development. The authors also address the necessity of training and simulations. Finally, the authors cite several examples illustrating the benefits of understanding and utilizing the mission operations process.
Managing Decisions on Changes in the Virtual Enterprise Evolution
NASA Astrophysics Data System (ADS)
Drissen-Silva, Marcus Vinicius; Rabelo, Ricardo José
VE evolution deals with problems that happen during the VE operation and that put on risk planned results. This requires the application of problem-solving mechanisms to guarantee the construction of a new but feasible VE plan. Grounded on Project Management and Decision Support Systems foundations, this paper proposes a distributed collaborative decision support system to manage the VE evolution. Its main rationale is that VE’s members are autonomous and hence that all the affected partners should discuss about the necessary changes on the current VE’s plan. In the proposed approach, this discussion is guided by a decision protocol, and the impact of decisions can be evaluated. Results of a first prototype implementation are presented and discussed, with a special focus on the part which regulates the argumentation, voting and comparison of possible solutions.
Program on State Agency Remote Sensing Data Management (SARSDM). [missouri
NASA Technical Reports Server (NTRS)
Eastwood, L. F., Jr.; Gotway, E. O.
1978-01-01
A planning study for developing a Missouri natural resources information system (NRIS) that combines satellite-derived data and other information to assist in carrying out key state tasks was conducted. Four focal applications -- dam safety, ground water supply monitoring, municipal water supply monitoring, and Missouri River basin modeling were identified. Major contributions of the study are: (1) a systematic choice and analysis of a high priority application (water resources) for a Missouri, LANDSAT-based information system; (2) a system design and implementation plan, based on Missouri, but useful for many other states; (3) an analysis of system costs, component and personnel requirements, and scheduling; and (4) an assessment of deterrents to successful technological innovation of this type in state government, and a system management plan, based on this assessment, for overcoming these obstacles in Missouri.
Gregg, Jane; O'Hara, Lily
2007-04-01
There is a need for a system of values and principles consistent with modern health promotion that enables practitioners to use these values and principles to understand health and in their needs assessment, planning, implementation and evaluation practice. Grounded theory, document analysis and the authors' own practice experience were used to systematically collect and analyse data from key health promotion literature and to develop the Red Lotus Health Promotion Model. The Red Lotus Health Promotion Model is a new model for holistic, ecological, salutogenic health promotion practice. It is distinct from other health promotion models in that it incorporates a system of values and principles that is applied across the phases of health promotion, including determining the health paradigm, needs assessment, planning, implementation and evaluation. The Red Lotus Health Promotion Model enables practitioners to proactively and purposefully put into action a connected system of values and principles across the phases of a health promotion process.
The Telecommunications and Data Acquisition Report
NASA Technical Reports Server (NTRS)
Posner, Edward C. (Editor)
1991-01-01
This quarterly publication provides archival reports on developments in programs managed by the Jet Propulsion Laboratory's (JPL's) Office of Telecommunications and Data Acquisition (TDA). In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on the activities of the Deep Space Network (DSN) in planning, in supporting research and technology, in implementation, and in operations. Also included is standards activity at JPL for space data, information systems, and reimbursable DSN work performed for other space agencies through NASA.
NASA Technical Reports Server (NTRS)
Thorman, H. C.
1975-01-01
Key characteristics of the Deep Space Network Test and Training System were presented. Completion of the Mark III-75 system implementation is reported. Plans are summarized for upgrading the system to a Mark III-77 configuration to support Deep Space Network preparations for the Mariner Jupiter/Saturn 1977 and Pioneer Venus 1978 missions. A general description of the Deep Space Station, Ground Communications Facility, and Network Operations Control Center functions that comprise the Deep Space Network Test and Training System is also presented.
1991-11-01
S. Windeler, Bell Laboratories- 1970 Dr. 0. Leuchs, Kable and Metalwerke-"A New Self -Ex- "A Low Capacitance Cable for the T2 Digital Trans...Pickering is a member implementation as well as test and evaluation, of the New York Rubber Group, the Wire production base planning and product assurance...metallic German power utilities. ground or phase wire. The thus created new aerial cable changes in its mechanical characteristics only unimportantly
NASA Technical Reports Server (NTRS)
Reller, J. O., Jr.
1976-01-01
Data handling, communications, and documentation aspects of the ASSESS mission are described. Most experiments provided their own data handling equipment, although some used the airborne computer for backup, and one experiment required real-time computations. Communications facilities were set up to simulate those to be provided between Spacelab and the ground, including a downlink TV system. Mission documentation was kept to a minimum and proved sufficient. Examples are given of the basic documents of the mission.
Distributed intelligence for supervisory control
NASA Technical Reports Server (NTRS)
Wolfe, W. J.; Raney, S. D.
1987-01-01
Supervisory control systems must deal with various types of intelligence distributed throughout the layers of control. Typical layers are real-time servo control, off-line planning and reasoning subsystems and finally, the human operator. Design methodologies must account for the fact that the majority of the intelligence will reside with the human operator. Hierarchical decompositions and feedback loops as conceptual building blocks that provide a common ground for man-machine interaction are discussed. Examples of types of parallelism and parallel implementation on several classes of computer architecture are also discussed.
The planned Alaska SAR Facility - An overview
NASA Technical Reports Server (NTRS)
Carsey, Frank; Weeks, Wilford
1987-01-01
The Alaska SAR Facility (ASF) is described in an overview fashion. The facility consists of three major components, a Receiving Ground System, a SAR Processing System and an Analysis and Archiving System; the ASF Program also has a Science Working Team and the requisite management and operations systems. The ASF is now an approved and fully funded activity; detailed requirements and science background are presented for the facility to be implemented for data from the European ERS-1, the Japanese ERS-1 and Radarsat.
Study and Design of Flight Data Recording Systems for Military Aircraft
1976-06-01
minicomputer (PDP-11/ 40 ) with 24K of core memory and a disk operating system. Peripherals include a CRT terminal, two 9-track magnetic tape drives, a 19 high...in question-answer mode. The NTSB plans to adapt an existing routine to the PDP 11/ 40 which will prepare a ground track of the aircraft from the...20 microseconds). Like PMOS memory, multiple power supplies were required. The next generation of microprocessors were implemented on a 40 pin package
The Telecommunications and Data Acquisition
NASA Technical Reports Server (NTRS)
Posner, Edward C. (Editor)
1992-01-01
This quarterly publication provides archival reports on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA). In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DSN) in planning, supporting research and technology, implementation, and operations. Also included are standards activity at JPL for space data and information systems and reimbursable DSN work performed for other space agencies through NASA. The preceding work is all performed for NASA's Office of Space Communications (OSC).
An airborne remote sensing system for urban air quality
NASA Technical Reports Server (NTRS)
Duncan, L. J.; Friedman, E. J.; Keitz, E. L.; Ward, E. A.
1974-01-01
Several NASA sponsored remote sensors and possible airborne platforms were evaluated. Outputs of dispersion models for SO2 and CO pollution in the Washington, D.C. area were used with ground station data to establish the expected performance and limitations of the remote sensors. Aircraft/sensor support requirements are discussed. A method of optimum flight plan determination was made. Cost trade offs were performed. Conclusions about the implementation of various instrument packages as parts of a comprehensive air quality monitoring system in Washington are presented.
Galactic Cosmic Ray Simulator at the NASA Space Radiation Laboratory
NASA Technical Reports Server (NTRS)
Norbury, John W.; Slaba, Tony C.; Rusek, Adam
2015-01-01
The external Galactic Cosmic Ray (GCR) spectrum is significantly modified when it passes through spacecraft shielding and astronauts. One approach for simulating the GCR space radiation environment is to attempt to reproduce the unmodified, external GCR spectrum at a ground based accelerator. A possibly better approach would use the modified, shielded tissue spectrum, to select accelerator beams impinging on biological targets. NASA plans for implementation of a GCR simulator at the NASA Space Radiation Laboratory (NSRL) at Brookhaven National Laboratory will be discussed.
Vector neural network signal integration for radar application
NASA Astrophysics Data System (ADS)
Bierman, Gregory S.
1994-07-01
The Litton Data Systems Vector Neural Network (VNN) is a unique multi-scan integration algorithm currently in development. The target of interest is a low-flying cruise missile. Current tactical radar cannot detect and track the missile in ground clutter at tactically useful ranges. The VNN solves this problem by integrating the energy from multiple frames to effectively increase the target's signal-to-noise ratio. The implementation plan is addressing the APG-63 radar. Real-time results will be available by March 1994.
Weber, Scott; Crago, Elizabeth A; Sherwood, Paula R; Smith, Tara
2009-11-01
The aim of this study was to explore the experiences of nurses and physicians who use a clinical decision support system (CDSS) in the critical care area, focusing on clinicians' motives and values related to decisions to either use or not use this optional technology. Information technology (IT) has been demonstrated to positively impact quality of patient care. Decision-support technology serves as an adjunct to, not as a replacement for, actual clinical decision making. Nurse administrators play an imperative role in the planning and implementation of IT projects and can benefit from understanding clinicians' affective considerations and approaches to the technology. This qualitative study used grounded theory methods. A total of 33 clinicians participated in in-depth structured interviews probing their professional concerns with how the technology is used. Data were analyzed using the constant comparative method. Medical staff were frustrated by perceived lack of planning input before system implementation. Both nurse and physician cohort groups were dissatisfied with preimplementation education. Barriers to system use were identified in significant detail by the participants. Both nurses and physicians should be involved in preimplementation planning and ongoing evaluation of CDSSs. There is a need for a systematic review or Cochrane meta-analysis describing the affective aspects of successful implementations of decisional technology in critical care, specifically from the perspective of nursing administrators.
Using a social-ecological framework to inform the implementation of conservation plans.
Guerrero, Angela M; Wilson, Kerrie A
2017-04-01
One of the key determinants of success in biodiversity conservation is how well conservation planning decisions account for the social system in which actions are to be implemented. Understanding elements of how the social and ecological systems interact can help identify opportunities for implementation. Utilizing data from a large-scale conservation initiative in southwestern of Australia, we explored how a social-ecological system framework can be applied to identify how social and ecological factors interact to influence the opportunities for conservation. Using data from semistructured interviews, an online survey, and publicly available data, we developed a conceptual model of the social-ecological system associated with the conservation of the Fitz-Stirling region. We used this model to identify the relevant variables (remnants of vegetation, stakeholder presence, collaboration between stakeholders, and their scale of management) that affect the implementation of conservation actions in the region. We combined measures for these variables to ascertain how areas associated with different levels of ecological importance coincided with areas associated with different levels of stakeholder presence, stakeholder collaboration, and scales of management. We identified areas that could benefit from different implementation strategies, from those suitable for immediate conservation action to areas requiring implementation over the long term to increase on-the-ground capacity and identify mechanisms to incentivize implementation. The application of a social-ecological framework can help conservation planners and practitioners facilitate the integration of ecological and social data to inform the translation of priorities for action into implementation strategies that account for the complexities of conservation problems in a focused way. © 2016 Society for Conservation Biology.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick; Burmeister, Mark
2016-05-01
The purpose of this CAP is to provide the plan for implementation of the recommended corrective action alternatives (CAAs) for CAU 568. Site characterization activities were performed in 2014, and the results are presented in Appendix A of the CAU 568 CADD. The CAAs were recommended in the CADD. The scope of work required to implement the recommended CAAs of closure in place and clean closure at 11 of the 14 CASs includes the following: The installation of physical barriers over the nine safety experiment ground zeroes to cover contamination at CASs 03-23-20 (Otero), 03-23-23 (San Juan and Pascal-C), 03-23-31more » (Pascal-B, Luna, Colfax), 03-23-32 (Pascal-A), 03-23-33 (Valencia), and 03-23-34 (Chipmunk); the characterization and removal of three soil and debris piles at CAS 03-08-04, and one HCA soil pile at CAS 03-23-30; the removal of three steel well head covers (PSM) from CASs 03-23-20 (Otero), 03-23-31 (Luna), and 03-23-33 (Valencia); the removal of soil and lead PSM from two locations at CAS 03-26-04; Implementation of FFACO use restrictions at nine safety experiment ground zeroes at CASs 03-23-20, 03-23-23, 03-23-31, 03-23-32, 03-23-33, and 03-23-34; the steel well head cover at CAS 03-23-23; the areas meeting HCA conditions at CASs 03-23-19 and 03-23-31; and the Boomer crater area at CAS 03-45-01. The FFACO use restriction boundaries will be presented in the CAU 568 closure report.« less
47 CFR 22.857 - Channel plan for commercial aviation air-ground systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 2 2010-10-01 2010-10-01 false Channel plan for commercial aviation air-ground systems. 22.857 Section 22.857 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES PUBLIC MOBILE SERVICES Air-Ground Radiotelephone Service Commercial Aviation Air-Ground...
Supporting Academic Language Development in Elementary Science: A Classroom Teaching Experiment
NASA Astrophysics Data System (ADS)
Jung, Karl Gerhard
Academic language is the language that students must engage in while participating in the teaching and learning that takes place in school (Schleppegrell, 2012) and science as a content area presents specific challenges and opportunities for students to engage with language (Buxton & Lee, 2014; Gee, 2005). In order for students to engage authentically and fully in the science learning that will take place in their classrooms, it is important that they develop their abilities to use science academic language (National Research Council, 2012). For this to occur, teachers must provide support to their students in developing the science academic language they will encounter in their classrooms. Unfortunately, this type of support remains a challenge for many teachers (Baecher, Farnsworth, & Ediger, 2014; Bigelow, 2010; Fisher & Frey, 2010) and teachers must receive professional development that supports their abilities to provide instruction that supports and scaffolds students' science academic language use and development. This study investigates an elementary science teacher's engagement in an instructional coaching partnership to explore how that teacher planned and implemented scaffolds for science academic language. Using a theoretical framework that combines the literature on scaffolding (Bunch, Walqui, & Kibler, 2015; Gibbons, 2015; Sharpe, 2001/2006) and instructional coaching (Knight, 2007/2009), this study sought to understand how an elementary science teacher plans and implements scaffolds for science academic language, and the resources that assisted the teacher in planning those scaffolds. The overarching goal of this work is to understand how elementary science teachers can scaffold language in their classroom, and how they can be supported in that work. Using a classroom teaching experiment methodology (Cobb, 2000) and constructivist grounded theory methods (Charmaz, 2014) for analysis, this study examined coaching conversations and classroom instruction to identify and understand what scaffolds are planned and implemented, and how that planning and implementation occurred through an instructional coaching partnership. Findings from this study showed the elementary science teacher planned and implemented a number of scaffolds for science academic language, focusing primarily on the use of sentence starters as a scaffolding strategy. The findings also indicated that the instructional coaching partnership played a vital role as the main resource that assisted the planning of scaffolds. These findings provide insights into the types of scaffolds that elementary science teachers can implement to scaffold science academic language, and the role that instructional coaching can play in supporting teachers as they work to provide instruction that scaffolds their students' language use and development.
Probabilistic Tracking and Trajectory Planning for Autonomous Ground Vehicles in Urban Environments
2016-03-05
SECURITY CLASSIFICATION OF: The aim of this research is to develop a unified theory for perception and planning in autonomous ground vehicles, with a...Report Title The aim of this research is to develop a unified theory for perception and planning in autonomous ground vehicles, with a specific focus on...a combination of experimentally collected vision data and Monte- Carlo simulations. Smoothing for improved perception and robustness in planning
Launching AI in NASA ground systems
NASA Technical Reports Server (NTRS)
Perkins, Dorothy C.; Truszkowski, Walter F.
1990-01-01
This paper will discuss recent operational successes in implementing expert systems to support the complex functions of NASA mission control systems at the Goddard Space Flight Center, including fault detection and diagnosis for real time and engineering analysis functions in the Cosmic Background Explorer and Gamma Ray Observatory missions and automation of resource planning and scheduling functions for various missions. It will also discuss ongoing developments and prototypes that will lead to increasingly sophisticated applications of artificial intelligence. These include the use of neural networks to perform telemetry monitoring functions, the implementation of generic expert system shells that can be customized to telemetry handling functions specific to NASA control centers, the applications of AI in training and user support, the long-term potential of implementing systems based around distributed, cooperative problem solving, and the use of AI to control and assist system development activities.
From Regional Hazard Assessment to Nuclear-Test-Ban Treaty Support - InSAR Ground Motion Services
NASA Astrophysics Data System (ADS)
Lege, T.; Kalia, A.; Gruenberg, I.; Frei, M.
2016-12-01
There are numerous scientific applications of InSAR methods in tectonics, earthquake analysis and other geologic and geophysical fields. Ground motion on local and regional scale measured and monitored via the application of the InSAR techniques provide scientists and engineers with plenty of new insights and further understanding of subsurface processes. However, the operational use of InSAR is not yet very widespread. To foster the operational utilization of the Copernicus Sentinel Satellites in the day-to-day business of federal, state and municipal work and planning BGR (Federal Institute for Geosciences and Natural Resources) initiated workshops with potential user groups. Through extensive reconcilement of interests and demands with scientific, technical, economic and governmental stakeholders (e.g. Ministries, Mining Authorities, Geological Surveys, Geodetic Surveys and Environmental Agencies on federal and state level, SMEs, German Aerospace Center) BGR developed the concept of the InSAR based German National Ground Motion Service. One important backbone for the nationwide ground motion service is the so-called Persistent Scatterer Interferometry Wide Area Product (WAP) approach developed with grants of European research funds. The presentation shows the implementation of the ground motion service and examples for product developments for operational supervision of mining, water resources management and spatial planning. Furthermore the contributions of Copernicus Sentinel 1 radar data in the context of CTBT are discussed. The DInSAR processing of Sentinel 1 IW (Interferometric Wide Swath) SAR acquisitions from January 1st and 13th Jan. 2016 allow for the first time a near real time ground motion measurement of the North Korean nuclear test site. The measured ground displacements show a strong spatio-temporal correlation to the calculated epicenter measured by teleseismic stations. We are convinced this way another space technique will soon contribute even further to secure better societal information needs.
Bee, Penny; Brooks, Helen; Fraser, Claire; Lovell, Karina
2015-12-01
Involving users/carers in mental health care-planning is central to international policy initiatives yet users frequently report feeling excluded from the care planning process. Rigorous explorations of mental health professionals' experiences of care planning are lacking, limiting our understanding of this important translational gap. To explore professional perceptions of delivering collaborative mental health care-planning and involving service users and carers in their care. Qualitative interviews and focus groups with data combined and subjected to framework analysis. UK secondary care mental health services. 51 multi-disciplinary professionals involved in care planning and recruited via study advertisements. Emergent themes identified care-planning as a meaningful platform for user/carer involvement but revealed philosophical tensions between user involvement and professional accountability. Professionals emphasised their individual, relational skills as a core facilitator of involvement, highlighting some important deficiencies in conventional staff training programmes. Although internationally accepted on philosophical grounds, user-involved care-planning is poorly defined and lacks effective implementation support. Its full realisation demands greater recognition of both the historical and contemporary contexts in which statutory mental healthcare occurs. Copyright © 2015 The Authors. Published by Elsevier Ltd.. All rights reserved.
Automated observation scheduling for the VLT
NASA Technical Reports Server (NTRS)
Johnston, Mark D.
1988-01-01
It is becoming increasingly evident that, in order to optimize the observing efficiency of large telescopes, some changes will be required in the way observations are planned and executed. Not all observing programs require the presence of the astronomer at the telescope: for those programs which permit service observing it is possible to better match planned observations to conditions at the telescope. This concept of flexible scheduling has been proposed for the VLT: based on current and predicted environmental and instrumental observations which make the most efficient possible use of valuable time. A similar kind of observation scheduling is already necessary for some space observatories, such as Hubble Space Telescope (HST). Space Telescope Science Institute is presently developing scheduling tools for HST, based on the use of artificial intelligence software development techniques. These tools could be readily adapted for ground-based telescope scheduling since they address many of the same issues. The concept are described on which the HST tools are based, their implementation, and what would be required to adapt them for use with the VLT and other ground-based observatories.
Strategies for Validation Testing of Ground Systems
NASA Technical Reports Server (NTRS)
Annis, Tammy; Sowards, Stephanie
2009-01-01
In order to accomplish the full Vision for Space Exploration announced by former President George W. Bush in 2004, NASA will have to develop a new space transportation system and supporting infrastructure. The main portion of this supporting infrastructure will reside at the Kennedy Space Center (KSC) in Florida and will either be newly developed or a modification of existing vehicle processing and launch facilities, including Ground Support Equipment (GSE). This type of large-scale launch site development is unprecedented since the time of the Apollo Program. In order to accomplish this successfully within the limited budget and schedule constraints a combination of traditional and innovative strategies for Verification and Validation (V&V) have been developed. The core of these strategies consists of a building-block approach to V&V, starting with component V&V and ending with a comprehensive end-to-end validation test of the complete launch site, called a Ground Element Integration Test (GEIT). This paper will outline these strategies and provide the high level planning for meeting the challenges of implementing V&V on a large-scale development program. KEY WORDS: Systems, Elements, Subsystem, Integration Test, Ground Systems, Ground Support Equipment, Component, End Item, Test and Verification Requirements (TVR), Verification Requirements (VR)
Navigation of military and space unmanned ground vehicles in unstructured terrains
NASA Technical Reports Server (NTRS)
Lescoe, Paul; Lavery, David; Bedard, Roger
1991-01-01
Development of unmanned vehicles for local navigation in terrains unstructured by humans is reviewed. Modes of navigation include teleoperation or remote control, computer assisted remote driving (CARD), and semiautonomous navigation (SAN). A first implementation of a CARD system was successfully tested using the Robotic Technology Test Vehicle developed by Jet Propulsion Laboratory. Stereo pictures were transmitted to a remotely located human operator, who performed the sensing, perception, and planning functions of navigation. A computer provided range and angle measurements and the path plan was transmitted to the vehicle which autonomously executed the path. This implementation is to be enhanced by providing passive stereo vision and a reflex control system for autonomously stopping the vehicle if blocked by an obstacle. SAN achievements include implementation of a navigation testbed on a six wheel, three-body articulated rover vehicle, development of SAN algorithms and code, integration of SAN software onto the vehicle, and a successful feasibility demonstration that represents a step forward towards the technology required for long-range exploration of the lunar or Martian surface. The vehicle includes a passive stereo vision system with real-time area-based stereo image correlation, a terrain matcher, a path planner, and a path execution planner.
NASA Astrophysics Data System (ADS)
Wright, Adam A.; Momin, Orko; Shin, Young Ho; Shakya, Rahul; Nepal, Kumud; Ahlgren, David J.
2010-01-01
This paper presents the application of a distributed systems architecture to an autonomous ground vehicle, Q, that participates in both the autonomous and navigation challenges of the Intelligent Ground Vehicle Competition. In the autonomous challenge the vehicle is required to follow a course, while avoiding obstacles and staying within the course boundaries, which are marked by white lines. For the navigation challenge, the vehicle is required to reach a set of target destinations, known as way points, with given GPS coordinates and avoid obstacles that it encounters in the process. Previously the vehicle utilized a single laptop to execute all processing activities including image processing, sensor interfacing and data processing, path planning and navigation algorithms and motor control. National Instruments' (NI) LabVIEW served as the programming language for software implementation. As an upgrade to last year's design, a NI compact Reconfigurable Input/Output system (cRIO) was incorporated to the system architecture. The cRIO is NI's solution for rapid prototyping that is equipped with a real time processor, an FPGA and modular input/output. Under the current system, the real time processor handles the path planning and navigation algorithms, the FPGA gathers and processes sensor data. This setup leaves the laptop to focus on running the image processing algorithm. Image processing as previously presented by Nepal et. al. is a multi-step line extraction algorithm and constitutes the largest processor load. This distributed approach results in a faster image processing algorithm which was previously Q's bottleneck. Additionally, the path planning and navigation algorithms are executed more reliably on the real time processor due to the deterministic nature of operation. The implementation of this architecture required exploration of various inter-system communication techniques. Data transfer between the laptop and the real time processor using UDP packets was established as the most reliable protocol after testing various options. Improvement can be made to the system by migrating more algorithms to the hardware based FPGA to further speed up the operations of the vehicle.
Refrigeration Plant, North Elevation, Second Floor Plan, East Elevation, Ground ...
Refrigeration Plant, North Elevation, Second Floor Plan, East Elevation, Ground Floor Plan, Section A-A - Kennecott Copper Corporation, On Copper River & Northwestern Railroad, Kennicott, Valdez-Cordova Census Area, AK
Helicopter Surveys for Locating Wells and Leaking Oilfield Infrastructure
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hammack, R.W.; Veloski, G.A.; Hodges, G.
2006-10-01
Prior to the injection of CO2 into geological formations, either for enhanced oil recovery or for CO2 sequestration, it is necessary to locate wells that perforate the target formation and are within the radius of influence for planned injection wells. Locating and plugging wells is necessary because improperly plugged well bores provide the most rapid route for CO2 escape to the surface. This paper describes the implementation and evaluation of helicopter and ground-based well detection strategies at a 100+ year old oilfield in Wyoming where a CO2 flood is planned. This project was jointly funded by the U.S. Department ofmore » Energy’s National Energy Technology Laboratory and Fugro Airborne Surveys« less
40 CFR 265.118 - Post-closure plan; amendment of plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... the current post-closure plan (e.g., leachate or ground-water monitoring results, characteristics of... and the environment (e.g., leachate or ground-water monitoring results indicate a potential for...
40 CFR 265.118 - Post-closure plan; amendment of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the current post-closure plan (e.g., leachate or ground-water monitoring results, characteristics of... and the environment (e.g., leachate or ground-water monitoring results indicate a potential for...
Definition of ground test for verification of large space structure control
NASA Technical Reports Server (NTRS)
Glaese, John R.
1994-01-01
Under this contract, the Large Space Structure Ground Test Verification (LSSGTV) Facility at the George C. Marshall Space Flight Center (MSFC) was developed. Planning in coordination with NASA was finalized and implemented. The contract was modified and extended with several increments of funding to procure additional hardware and to continue support for the LSSGTV facility. Additional tasks were defined for the performance of studies in the dynamics, control and simulation of tethered satellites. When the LSSGTV facility development task was completed, support and enhancement activities were funded through a new competitive contract won by LCD. All work related to LSSGTV performed under NAS8-35835 has been completed and documented. No further discussion of these activities will appear in this report. This report summarizes the tether dynamics and control studies performed.
Ground operation of the mobile servicing system on Space Station Freedom
NASA Astrophysics Data System (ADS)
Wojcik, Z. A.
1992-11-01
Space Station Freedom (SSF) will be assembled in the 1995 to 2000 time period, when permanently manned capability (PMC) will be achieved. During the build phase and after PMC, the Mobile Servicing System (MSS) will be used as a tool to assist crew in the building and in assembly and all maintenance aspects of SSF. Operation of the MSS will be executed and controlled by on-orbit crew, thereby having an impact on the limited crew time and resources. The current plan specifies that the MSS will not be operable when crew are not present. Simulations have been carried out to quantify the maintenance workload expected over the life of SSF. These simulations predict a peak in maintenance demand occurring even before PMC is achieved. The MSS is key to executing those maintenance tasks, and as a result, the demands on MSS crew resource will likely exceed availability, thereby creating a backlog of maintenance actions and negatively impacting SSF effectiveness. Ground operated telerobotics (GOT), the operation of the MSS from the ground, is being proposed as an approach to reducing the anticipated maintenance backlog, along with reducing crew workload when the MSS is executing simple or repetitive tasks. GOT would be implemented in a phased approach, both in terms of the type of activity carried out and the point of control gradually passing from on-orbit crew to ground personnel. The benefits of GOT are expressed in terms of reduced on-orbit crew workload, greater availability of the MSS during the post-PMC period, and the ability to significantly reduce or even eliminate any maintenance action backlog. The benefits section compares GOT with crew operation timelines, and identifies other benefits of GOT. Critical factors such as safety, space-ground communication latency, simulation, operations planning, and design considerations are reviewed.
Legislative Framework for Landscape Planning in Latvia
NASA Astrophysics Data System (ADS)
Nitavska, Natalija; Zigmunde, Daiga
2017-10-01
With the adoption and the ratification of the European Landscape Convention a legally justified need for a clear landscape policy was grounded in the European countries. It includes the elaboration of the new and the improvement of the existing legislative documents on landscape planning, protection and management. The aim of the particular study is to analyse the existing legislative documents in Latvia influencing landscape planning on different scales / and the implementation of the European Landscape Convention. The study emphasizes the complex structure of the Latvian legislative framework affected by the distribution of the normative documents under the various ministries. Therefore, the main problem is unclear responsibility levels and organizational system for solving the issues regarding landscape planning, protection and management. Thus the various discussions between the involved disciplines and responsible institutions are arising. Two groups of the legislative documents influencing the implementation of the landscape policy in Latvia are detected within the study. The first group is strategic documents determining main landscape planning principles and directions at European, national, regional and professional or sectoral level. The second group is operational documents providing a set of actions for the landscape planning, protection and management at the local or the municipality level. The study concludes that operational documents developed by the municipalities are in high importance because of their direct influence on the landscape planning in Latvia. This often leads to the different landscape planning requirements included in the normative documents of the neighbouring municipalities, although the spatial and ecological borders of the visual landscape do not fit with the formal borders of the municipalities. Thus, it is essential to develop the common principles and actions that would be incumbent on all municipalities to provide the landscape integrity and to protect its values according to the main principles defined in the European Landscape Convention.
NASA Technical Reports Server (NTRS)
Arozullah, Mohammed
1991-01-01
The Platform Data Management System (DMS) collects Housekeeping (H/K), Payload (P/L) Engineering, and Payload Science data from various subsystems and payloads on the platform for transmission to the ground through the downlink via TDRSS. The DMS also distributes command data received from the ground to various subsystems and payloads. In addition, DMS distributes timing and safemode data. The function of collection and distribution of various types of data is performed by the Command and Data Handling (C&DH) subsystem of DMS. The C&DH subsystem uses for this purpose a number of data buses namely, Housekeeping, Payload Engineering, Payload Science, and Time and Safemode buses. Out of these buses, the H/K, P/L Engineering, and P/L Science buses are planned to be implemented by using MIL-STD 1553 bus. Most of the period covered was spent in developing a queue theoretic model of the 1553 Bus as used in the DMS. The aim is to use this model to test the performance and suitability of the 1553 Bus to the DMS under a number of alternative design scenarios.
Environmental assessment of spatial plan policies through land use scenarios
DOE Office of Scientific and Technical Information (OSTI.GOV)
Geneletti, Davide, E-mail: davide.geneletti@ing.unitn.it
2012-01-15
This paper presents a method based on scenario analysis to compare the environmental effects of different spatial plan policies in a range of possible futures. The study aimed at contributing to overcome two limitations encountered in Strategic Environmental Assessment (SEA) for spatial planning: poor exploration of how the future might unfold, and poor consideration of alternative plan policies. Scenarios were developed through what-if functions and spatial modeling in a Geographical Information System (GIS), and consisted in maps that represent future land uses under different assumptions on key driving forces. The use of land use scenarios provided a representation of howmore » the different policies will look like on the ground. This allowed gaining a better understanding of the policies' implications on the environment, which could be measured through a set of indicators. The research undertook a case-study approach by developing and assessing land use scenarios for the future growth of Caia, a strategically-located and fast-developing town in rural Mozambique. The effects of alternative spatial plan policies were assessed against a set of environmental performance indicators, including deforestation, loss of agricultural land, encroachment of flood-prone areas and wetlands and access to water sources. In this way, critical environmental effects related to the implementation of each policy were identified and discussed, suggesting possible strategies to address them. - Graphical abstract: Display Omitted Research Highlights: Black-Right-Pointing-Pointer The method contributes to two critical issues in SEA: exploration of the future and consideration of alternatives. Black-Right-Pointing-Pointer Future scenarios are used to test the environmental performance of different spatial plan policies in uncertainty conditions. Black-Right-Pointing-Pointer Spatially-explicit land use scenarios provide a representation of how different policies will look like on the ground.« less
Zero to Integration in Eight Months, the Dawn Ground Data System Engineering Challange
NASA Technical Reports Server (NTRS)
Dubon, Lydia P.
2006-01-01
The Dawn Project has presented the Ground Data System (GDS) with technical challenges driven by cost and schedule constraints commonly associated with National Aeronautics and Space Administration (NASA) Discovery Projects. The Dawn mission consists of a new and exciting Deep Space partnership among: the Jet Propulsion Laboratory (JPL), responsible for project management and flight operations; Orbital Sciences Corporation (OSC), spacecraft builder and responsible for flight system test and integration; and the University of California, at Los Angeles (UCLA), responsible for science planning and operations. As a cost-capped mission, one of Dawn s implementation strategies is to leverage from both flight and ground heritage. OSC's ground data system is used for flight system test and integration as part of the flight heritage strategy. Mission operations, however, are to be conducted with JPL s ground system. The system engineering challenge of dealing with two heterogeneous ground systems emerged immediately. During the first technical interchange meeting between the JPL s GDS Team and OSC's Flight Software Team, August 2003, the need to integrate the ground system with the flight software was brought to the table. This need was driven by the project s commitment to enable instrument engineering model integration in a spacecraft simulator environment, for both demonstration and risk mitigation purposes, by April 2004. This paper will describe the system engineering approach that was undertaken by JPL's GDS Team in order to meet the technical challenge within a non-negotiable eight-month schedule. Key to the success was adherence to an overall systems engineering process and fundamental systems engineering practices: decomposition of the project request into manageable requirements; definition of a structured yet flexible development process; integration of multiple ground disciplines and experts into a focused team effort; in-process risk management; and aggregation of the intermediate products to an integrated final product. In addition, this paper will highlight the role of lessons learned from the integration experience. The lessons learned from an early GDS deployment have served as the foundation for the design and implementation of the Dawn Ground Data System.
Concepts and algorithms for terminal-area traffic management
NASA Technical Reports Server (NTRS)
Erzberger, H.; Chapel, J. D.
1984-01-01
The nation's air-traffic-control system is the subject of an extensive modernization program, including the planned introduction of advanced automation techniques. This paper gives an overview of a concept for automating terminal-area traffic management. Four-dimensional (4D) guidance techniques, which play an essential role in the automated system, are reviewed. One technique, intended for on-board computer implementation, is based on application of optimal control theory. The second technique is a simplified approach to 4D guidance intended for ground computer implementation. It generates advisory messages to help the controller maintain scheduled landing times of aircraft not equipped with on-board 4D guidance systems. An operational system for the second technique, recently evaluated in a simulation, is also described.
NASA Technical Reports Server (NTRS)
Shalkhauser, Mary JO; Quintana, Jorge A.; Soni, Nitin J.
1994-01-01
The NASA Lewis Research Center is developing a multichannel communication signal processing satellite (MCSPS) system which will provide low data rate, direct to user, commercial communications services. The focus of current space segment developments is a flexible, high-throughput, fault tolerant onboard information switching processor. This information switching processor (ISP) is a destination-directed packet switch which performs both space and time switching to route user information among numerous user ground terminals. Through both industry study contracts and in-house investigations, several packet switching architectures were examined. A contention-free approach, the shared memory per beam architecture, was selected for implementation. The shared memory per beam architecture, fault tolerance insertion, implementation, and demonstration plans are described.
Resource Allocation Planning Helper (RALPH): Lessons learned
NASA Technical Reports Server (NTRS)
Durham, Ralph; Reilly, Norman B.; Springer, Joe B.
1990-01-01
The current task of Resource Allocation Process includes the planning and apportionment of JPL's Ground Data System composed of the Deep Space Network and Mission Control and Computing Center facilities. The addition of the data driven, rule based planning system, RALPH, has expanded the planning horizon from 8 weeks to 10 years and has resulted in large labor savings. Use of the system has also resulted in important improvements in science return through enhanced resource utilization. In addition, RALPH has been instrumental in supporting rapid turn around for an increased volume of special what if studies. The status of RALPH is briefly reviewed and important lessons learned from the creation of an highly functional design team are focused on through an evolutionary design and implementation period in which an AI shell was selected, prototyped, and ultimately abandoned, and through the fundamental changes to the very process that spawned the tool kit. Principal topics include proper integration of software tools within the planning environment, transition from prototype to delivered to delivered software, changes in the planning methodology as a result of evolving software capabilities and creation of the ability to develop and process generic requirements to allow planning flexibility.
Situational analysis and future directions of AYUSH: An assessment through 5-year plans of India.
Samal, Janmejaya
2015-01-01
AYUSH is an acronym for Ayurveda, Yoga and Naturopathy, Unani, Siddha, and Homeopathy. These are the six indigenous systems of medicine practiced in India. A department called Department of Indian System of medicine was created in March 1995 and renamed to AYUSH in November 2003 with a focus to provide increased attention for the development of these systems. Very recently, in 2014, a separate ministry was created under the union Government of India, which is headed by a minister of state. Planning regarding these systems of medicine was a part of 5-year planning process since 1951. Since then many developments have happened in this sector albeit the system was struggling with a great degree of uncertainty at the time of 1(st)5-year plan. A progressive path of development could be observed since the first to the 12(th)5-year plan. It was up to the 7(th)plan the growth was little sluggish and from 8(th)plan onward the growth took its pace and several innovative development processes could be observed thereafter. The system is gradually progressing ahead with a vision to be a globally accepted system, as envisaged in 11(th)5-year plan. Currently, AYUSH system is a part of mainstream health system implemented under National Rural Health Mission (NRHM). NRHM came into play in 2005 but implemented at ground level in 2006 and introduced the scheme of "Mainstreaming of AYUSH and revitalization of local health traditions" to strengthen public health services. This scheme is currently in operation in its second phase, since 1(st)April 2012, with the 12(th)5-year plan. The scheme was primarily brought in to operation with three important objectives; choice of treatment system to the patients, strengthen facility functionally and strengthen the implementation of national health programmes, however, in some places it seems to be a forced medical pluralism owing to a top-down approach by the union government without considerable involvement of the concerned community. In this study, the 5-year planning documents have been reviewed, from the 1(st)plan to 12(th)plan, to enable reflection and throw some light into the future directions of AYUSH system.
NASA Astrophysics Data System (ADS)
Arndt, J.; Kreimer, J.
2010-09-01
The European Space Laboratory COLUMBUS was launched in February 2008 with NASA Space Shuttle Atlantis. Since successful docking and activation this manned laboratory forms part of the International Space Station(ISS). Depending on the objectives of the Mission Increments the on-orbit configuration of the COLUMBUS Module varies with each increment. This paper describes the end-to-end verification which has been implemented to ensure safe operations under the condition of a changing on-orbit configuration. That verification process has to cover not only the configuration changes as foreseen by the Mission Increment planning but also those configuration changes on short notice which become necessary due to near real-time requests initiated by crew or Flight Control, and changes - most challenging since unpredictable - due to on-orbit anomalies. Subject of the safety verification is on one hand the on orbit configuration itself including the hardware and software products, on the other hand the related Ground facilities needed for commanding of and communication to the on-orbit System. But also the operational products, e.g. the procedures prepared for crew and ground control in accordance to increment planning, are subject of the overall safety verification. In order to analyse the on-orbit configuration for potential hazards and to verify the implementation of the related Safety required hazard controls, a hierarchical approach is applied. The key element of the analytical safety integration of the whole COLUMBUS Payload Complement including hardware owned by International Partners is the Integrated Experiment Hazard Assessment(IEHA). The IEHA especially identifies those hazardous scenarios which could potentially arise through physical and operational interaction of experiments. A major challenge is the implementation of a Safety process which owns quite some rigidity in order to provide reliable verification of on-board Safety and which likewise provides enough flexibility which is desired by manned space operations with scientific objectives. In the period of COLUMBUS operations since launch already a number of lessons learnt could be implemented especially in the IEHA that allow to improve the flexibility of on-board operations without degradation of Safety.
Lessons Learned During Implementation and Early Operations of the DS1 Beacon Monitor Experiment
NASA Technical Reports Server (NTRS)
Sherwood, Rob; Wyatt, Jay; Hotz, Henry; Schlutsmeyer, Alan; Sue, Miles
1998-01-01
A new approach to mission operations will be flight validated on NASA's New Millennium Program Deep Space One (DS1) mission which launched in October 1998. The Beacon Monitor Operations Technology is aimed at decreasing the total volume of downlinked engineering telemetry by reducing the frequency of downlink and the volume of data received per pass. Cost savings are achieved by reducing the amount of routine telemetry processing and analysis performed by ground staff. The technology is required for upcoming NASA missions to Pluto, Europa, and possibly some other missions. With beacon monitoring, the spacecraft will assess its own health and will transmit one of four beacon messages each representing a unique frequency tone to inform the ground how urgent it is to track the spacecraft for telemetry. If all conditions are nominal, the tone provides periodic assurance to ground personnel that the mission is proceeding as planned without having to receive and analyze downlinked telemetry. If there is a problem, the tone will indicate that tracking is required and the resulting telemetry will contain a concise summary of what has occurred since the last telemetry pass. The primary components of the technology are a tone monitoring technology, AI-based software for onboard engineering data summarization, and a ground response system. In addition, there is a ground visualization system for telemetry summaries. This paper includes a description of the Beacon monitor concept, the trade-offs with adapting that concept as a technology experiment, the current state of the resulting implementation on DS1, and our lessons learned during the initial checkout phase of the mission. Applicability to future missions is also included.
Guerrero, Erick G; Harris, Lesley; Padwa, Howard; Vega, William A; Palinkas, Lawrence
2017-07-01
Little is known about how the Affordable Care Act (ACA) will be implemented in publicly funded addiction health services (AHS) organizations. Guided by a conceptual model of implementation of new practices in health care systems, this study relied on qualitative data collected in 2013 from 30 AHS clinical supervisors in Los Angeles County, California. Interviews were transcribed, coded, and analyzed using a constructivist grounded theory approach with ATLAS.ti software. Supervisors expected several potential effects of ACA implementation, including increased use of AHS services, shifts in the duration and intensity of AHS services, and workforce professionalization. However, supervisors were not prepared for actions to align their programs' strategic change plans with policy expectations. Findings point to the need for health care policy interventions to help treatment providers effectively respond to ACA principles of improving standards of care and reducing disparities.
NASA Technical Reports Server (NTRS)
Yeh, Pen-Shu; Miller, Warner H.; Venbrux, Jack; Liu, Norley; Rice, Robert F.
1993-01-01
Data compression has been proposed for several flight missions as a means of either reducing on board mass data storage, increasing science data return through a bandwidth constrained channel, reducing TDRSS access time, or easing ground archival mass storage requirement. Several issues arise with the implementation of this technology. These include the requirement of a clean channel, onboard smoothing buffer, onboard processing hardware and on the algorithm itself, the adaptability to scene changes and maybe even versatility to the various mission types. This paper gives an overview of an ongoing effort being performed at Goddard Space Flight Center for implementing a lossless data compression scheme for space flight. We will provide analysis results on several data systems issues, the performance of the selected lossless compression scheme, the status of the hardware processor and current development plan.
Harris, Lesley; Padwa, Howard; Vega, William A.; Palinkas, Lawrence
2015-01-01
Little is known about how the Affordable Care Act (ACA) will be implemented in publicly funded addiction health services (AHS) organizations. Guided by a conceptual model of implementation of new practices in health care systems, this study relied on qualitative data collected in 2013 from 30 AHS clinical supervisors in Los Angeles County, California. Interviews were transcribed, coded, and analyzed using a constructivist grounded theory approach with ATLAS.ti software. Supervisors expected several potential effects of ACA implementation, including increased use of AHS services, shifts in the duration and intensity of AHS services, and workforce professionalization. However, supervisors were not prepared for actions to align their programs’ strategic change plans with policy expectations. Findings point to the need for health care policy interventions to help treatment providers effectively respond to ACA principles of improving standards of care and reducing disparities. PMID:26008902
Biodiversity in School Grounds: Auditing, Monitoring and Managing an Action Plan
ERIC Educational Resources Information Center
Mansell, Michelle
2010-01-01
The idea of using site biodiversity action plans to introduce biodiversity management initiatives into school grounds is outlined. Selected parts of a case study, involving the use of such an action plan to record, monitor and plan for biodiversity on a university campus, are described and ideas for applying a similar plan to a school setting are…
A Technology Plan for Enabling Commercial Space Business
NASA Technical Reports Server (NTRS)
Lyles, Garry M.
1997-01-01
The National Aeronautics and Space Administration's (NASA) Advanced Space Transportation Program is a customer driven, focused technology program that supports the NASA Strategic Plan and considers future commercial space business projections. The initial cycle of the Advanced Space Transportation Program implementation planning was conducted from December 1995 through February 1996 and represented increased NASA emphasis on broad base technology development with the goal of dramatic reductions in the cost of space transportation. The second planning cycle, conducted in January and February 1997, updated the program implementation plan based on changes in the external environment, increased maturity of advanced concept studies, and current technology assessments. The program has taken a business-like approach to technology development with a balanced portfolio of near, medium, and long-term strategic targets. Strategic targets are influenced by Earth science, space science, and exploration objectives as well as commercial space markets. Commercial space markets include those that would be enhanced by lower cost transportation as well as potential markets resulting in major increases in space business induced by reductions in transportation cost. The program plan addresses earth-to-orbit space launch, earth orbit operations and deep space systems. It also addresses all critical transportation system elements; including structures, thermal protection systems, propulsion, avionics, and operations. As these technologies are matured, integrated technology flight experiments such as the X-33 and X-34 flight demonstrator programs support near-term (one to five years) development or operational decisions. The Advanced Space Transportation Program and the flight demonstrator programs combine business planning, ground-based technology demonstrations and flight demonstrations that will permit industry and NASA to commit to revolutionary new space transportation systems beginning at the turn of the century and continuing far into the future.
Web Application Software for Ground Operations Planning Database (GOPDb) Management
NASA Technical Reports Server (NTRS)
Lanham, Clifton; Kallner, Shawn; Gernand, Jeffrey
2013-01-01
A Web application facilitates collaborative development of the ground operations planning document. This will reduce costs and development time for new programs by incorporating the data governance, access control, and revision tracking of the ground operations planning data. Ground Operations Planning requires the creation and maintenance of detailed timelines and documentation. The GOPDb Web application was created using state-of-the-art Web 2.0 technologies, and was deployed as SaaS (Software as a Service), with an emphasis on data governance and security needs. Application access is managed using two-factor authentication, with data write permissions tied to user roles and responsibilities. Multiple instances of the application can be deployed on a Web server to meet the robust needs for multiple, future programs with minimal additional cost. This innovation features high availability and scalability, with no additional software that needs to be bought or installed. For data governance and security (data quality, management, business process management, and risk management for data handling), the software uses NAMS. No local copy/cloning of data is permitted. Data change log/tracking is addressed, as well as collaboration, work flow, and process standardization. The software provides on-line documentation and detailed Web-based help. There are multiple ways that this software can be deployed on a Web server to meet ground operations planning needs for future programs. The software could be used to support commercial crew ground operations planning, as well as commercial payload/satellite ground operations planning. The application source code and database schema are owned by NASA.
Baldes de fotones para espectrógrafos ópticos
NASA Astrophysics Data System (ADS)
Townsend, A.; Eikenberry, S.; Warner, C.; Donoso, V.; Díaz, R.; Levato, H.
2017-10-01
In order to implement low-cost large-aperture ground-based optical spectroscopy systems we are using inexpensive commercial-off-the-shelf telescopes and components to create semi-autonomous small telescope arrays and fiber-fed spectrographs. Small telescopes used conjointly (``photonic lightbuckets'') and connected by our new fiber-optic linkage have the effective light-gathering area of a larger telescope for about one-tenth of the cost. For the first prototype, we plan to feed the the LHIRES and BHROS spectrographs at ICATE with the equivalent collecting area of a one meter telescope.
ORD GROUND WATER RESEARCH PLAN: STRATEGY FOR FY 1991 AND BEYOND
This document describes a ground water research plan for EPA's Office of Research and Development (ORD). The ground water research program is carried out by ORD's Office of Environmental Processes and Effects Research (OEPER), the Office of Modeling, Monitoring Systems, and Quali...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 10 of the Delaware River Basin Compact and this regulation. Ground water recharge means the addition... REGULATIONS GROUND WATER PROTECTION AREA: PENNSYLVANIA § 430.5 Definitions. For purposes of this regulation... sufficient ground water to be important as a source of supply. Comprehensive Plan means the plans, policies...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 10 of the Delaware River Basin Compact and this regulation. Ground water recharge means the addition... REGULATIONS GROUND WATER PROTECTION AREA: PENNSYLVANIA § 430.5 Definitions. For purposes of this regulation... sufficient ground water to be important as a source of supply. Comprehensive Plan means the plans, policies...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-16
... Section of this Federal Register, EPA is approving the State's implementation plan revision as a direct... Promulgation of Implementation Plans; Georgia; State Implementation Plan Miscellaneous Revisions AGENCY... State Implementation Plan (SIP) submitted by the Georgia Environmental Protection Division to EPA in...
Physical Analysis Work for Slope Stability at Shah Alam, Selangor
NASA Astrophysics Data System (ADS)
Ishak, M. F.; Zaini, M. S. I.
2018-04-01
Slope stability analysis is performed to assess the equilibrium conditions and the safe design of a human-made or natural slope to find the endangered areas. Investigation of potential failure and determination of the slope sensitivity with regard to safety, reliability and economics were parts of this study. Ground anchor is designed to support a structure in this study. Ground anchor were implemented at the Mechanically Stabilized Earth (MSE) wall along Anak Persiaran Jubli Perak to overcome the further cracking of pavement parking, concrete deck and building of the Apartments. A result from the laboratory testing of soil sample such as index test and shear strength test were applied to the Slope/W software with regard to the ground anchors that were implemented. The ground anchors were implemented to increase the value of the factor of safety (FOS) of the MSE Wall. The value of the factor of safety (FOS) before implementing the ground anchor was 0.800 and after the ground anchor was implemented the value increase to 1.555. The increase percentage of factor of safety by implementing on stability of slope was 94.38%.
Science operations planning and implementation for Rosetta
NASA Astrophysics Data System (ADS)
Koschny, Detlef; Sweeney, Mark; Montagon, Elsa; Hoofs, Raymond; van der Plas, Peter
2002-07-01
The Rosetta mission is a cornerstone mission of the Horizon 2000 programme of the European Space Agency. It will be launched to comet 46P/Wirtanen in January 2003. This mission is the first of a series of planetary missions, including Mars Express, Smart-I (to the Moon), and BepiColombo (to Mercury). All these missions have similar requirements for their scientific operations. The Experiments H/W and S/W are developed by Principal Investigators, working at scientific institutes. They are also responsible for the operation of their experiments and for the generation of related operational documentation. The Science Operations Centre (SOC) has the task to consolidate the inputs of the different experimenters and the Lander and ensure that the resulting science operations timeline is free of conflicts. It forwards this timeline to the Mission Operations Centre (MOC) which combines the science operations with the operations of the other spacecraft subsystems and the orbit and attitude of the spacecraft. The MOC is also responsible for uplinking the operational command sequences to the spacecraft and for returning the received telemetry to the user. In a collaboration between the team of the Rosetta Project Scientist at the Research and Science Support Department of ESA/ESTEC and the European Space Operations Centre (ESA/ESOC), a concept for the SOC/MOC and their interfaces was developed for the Rosetta mission. This concept is generic enough to allow its implementation also for the other planetary missions. The design phase is now complete, and implementation is on-going. This paper briefly presents the architecture of the complex ground segment, concentrating on the elements required for planning of scientific operations, and then details the software tools EPS (Experiment Planning System) and PTB (Project Test Bed) which are used in the planning process.
Sensor-driven area coverage for an autonomous fixed-wing unmanned aerial vehicle.
Paull, Liam; Thibault, Carl; Nagaty, Amr; Seto, Mae; Li, Howard
2014-09-01
Area coverage with an onboard sensor is an important task for an unmanned aerial vehicle (UAV) with many applications. Autonomous fixed-wing UAVs are more appropriate for larger scale area surveying since they can cover ground more quickly. However, their non-holonomic dynamics and susceptibility to disturbances make sensor coverage a challenging task. Most previous approaches to area coverage planning are offline and assume that the UAV can follow the planned trajectory exactly. In this paper, this restriction is removed as the aircraft maintains a coverage map based on its actual pose trajectory and makes control decisions based on that map. The aircraft is able to plan paths in situ based on sensor data and an accurate model of the on-board camera used for coverage. An information theoretic approach is used that selects desired headings that maximize the expected information gain over the coverage map. In addition, the branch entropy concept previously developed for autonomous underwater vehicles is extended to UAVs and ensures that the vehicle is able to achieve its global coverage mission. The coverage map over the workspace uses the projective camera model and compares the expected area of the target on the ground and the actual area covered on the ground by each pixel in the image. The camera is mounted on a two-axis gimbal and can either be stabilized or optimized for maximal coverage. Hardware-in-the-loop simulation results and real hardware implementation on a fixed-wing UAV show the effectiveness of the approach. By including the already developed automatic takeoff and landing capabilities, we now have a fully automated and robust platform for performing aerial imagery surveys.
A Flight Deck Decision Support Tool for Autonomous Airborne Operations
NASA Technical Reports Server (NTRS)
Ballin, Mark G.; Sharma, Vivek; Vivona, Robert A.; Johnson, Edward J.; Ramiscal, Ermin
2002-01-01
NASA is developing a flight deck decision support tool to support research into autonomous operations in a future distributed air/ground traffic management environment. This interactive real-time decision aid, referred to as the Autonomous Operations Planner (AOP), will enable the flight crew to plan autonomously in the presence of dense traffic and complex flight management constraints. In assisting the flight crew, the AOP accounts for traffic flow management and airspace constraints, schedule requirements, weather hazards, aircraft operational limits, and crew or airline flight-planning goals. This paper describes the AOP and presents an overview of functional and implementation design considerations required for its development. Required AOP functionality is described, its application in autonomous operations research is discussed, and a prototype software architecture for the AOP is presented.
Aerospace Communications Security Technologies Demonstrated
NASA Technical Reports Server (NTRS)
Griner, James H.; Martzaklis, Konstantinos S.
2003-01-01
In light of the events of September 11, 2001, NASA senior management requested an investigation of technologies and concepts to enhance aviation security. The investigation was to focus on near-term technologies that could be demonstrated within 90 days and implemented in less than 2 years. In response to this request, an internal NASA Glenn Research Center Communications, Navigation, and Surveillance Aviation Security Tiger Team was assembled. The 2-year plan developed by the team included an investigation of multiple aviation security concepts, multiple aircraft platforms, and extensively leveraged datalink communications technologies. It incorporated industry partners from NASA's Graphical Weather-in-the-Cockpit research, which is within NASA's Aviation Safety Program. Two concepts from the plan were selected for demonstration: remote "black box," and cockpit/cabin surveillance. The remote "black box" concept involves real-time downlinking of aircraft parameters for remote monitoring and archiving of aircraft data, which would assure access to the data following the loss or inaccessibility of an aircraft. The cockpit/cabin surveillance concept involves remote audio and/or visual surveillance of cockpit and cabin activity, which would allow immediate response to any security breach and would serve as a possible deterrent to such breaches. The datalink selected for the demonstrations was VDL Mode 2 (VHF digital link), the first digital datalink for air-ground communications designed for aircraft use. VDL Mode 2 is beginning to be implemented through the deployment of ground stations and aircraft avionics installations, with the goal of being operational in 2 years. The first demonstration was performed December 3, 2001, onboard the LearJet 25 at Glenn. NASA worked with Honeywell, Inc., for the broadcast VDL Mode 2 datalink capability and with actual Boeing 757 aircraft data. This demonstration used a cockpitmounted camera for video surveillance and a coupling to the intercom system for audio surveillance. Audio, video, and "black box" data were simultaneously streamed to the ground, where they were displayed to a Glenn audience of senior management and aviation security team members.
Kukafka, Rita; Johnson, Stephen B; Linfante, Allison; Allegrante, John P
2003-06-01
Many interventions to improve the success of information technology (IT) implementations are grounded in behavioral science, using theories, and models to identify conditions and determinants of successful use. However, each model in the IT literature has evolved to address specific theoretical problems of particular disciplinary concerns, and each model has been tested and has evolved using, in most cases, a more or less restricted set of IT implementation procedures. Functionally, this limits the perspective for taking into account the multiple factors at the individual, group, and organizational levels that influence use behavior. While a rich body of literature has emerged, employing prominent models such as the Technology Adoption Model, Social-Cognitive Theory, and Diffusion of Innovation Theory, the complexity of defining a suitable multi-level intervention has largely been overlooked. A gap exists between the implementation of IT and the integration of theories and models that can be utilized to develop multi-level approaches to identify factors that impede usage behavior. We present a novel framework that is intended to guide synthesis of more than one theoretical perspective for the purpose of planning multi-level interventions to enhance IT use. This integrative framework is adapted from PRECEDE/PROCEDE, a conceptual framework used by health planners in hundreds of published studies to direct interventions that account for the multiple determinants of behavior. Since we claim that the literature on IT use behavior does not now include a multi-level approach, we undertook a systematic literature analysis to confirm this assertion. Our framework facilitated organizing this literature synthesis and our analysis was aimed at determining if the IT implementation approaches in the published literature were characterized by an approach that considered at least two levels of IT usage determinants. We found that while 61% of studies mentioned or referred to theory, none considered two or more levels. In other words, although the researchers employ behavioral theory, they omit two fundamental propositions: (1) IT usage is influenced by multiple factors and (2) interventions must be multi-dimensional. Our literature synthesis may provide additional insight into the reason for high failure rates associated with underutilized systems, and underscores the need to move beyond the current dominant approach that employs a single model to guide IT implementation plans that aim to address factors associated with IT acceptance and subsequent positive use behavior.
Practical approaches for assessing local land use change and conservation priorities in the tropics
NASA Astrophysics Data System (ADS)
Rivas, Cassandra J.
Tropical areas typically support high biological diversity; however, many are experiencing rapid land-use change. The resulting loss, fragmentation, and degradation of habitats place biodiversity at risk. For these reasons, the tropics are frequently identified as global conservation hotspots. Safeguarding tropical biodiversity necessitates successful and efficient conservation planning and implementation at local scales, where land use decisions are made and enforced. Yet, despite considerable agreement on the need for improved practices, planning may be difficult due to limited resources, such as funding, data, and expertise, especially for small conservation organizations in tropical developing countries. My thesis aims to assist small, non-governmental organizations (NGOs), operating in tropical developing countries, in overcoming resource limitations by providing recommendations for improved conservation planning. Following a brief introduction in Chapter 1, I present a literature review of systematic conservation planning (SCP) projects in the developing tropics. Although SCP is considered an efficient, effective approach, it requires substantial data and expertise to conduct the analysis and may present challenges for implementation. I reviewed and synthesized the methods and results of 14 case studies to identify practical ways to implement and overcome limitations for employing SCP. I found that SCP studies in the peer-reviewed literature were primarily implemented by researchers in large organizations or institutions, as opposed to on-the-ground conservation planners. A variety of data types were used in the SCP analyses, many of which data are freely available. Few case studies involved stakeholders and intended to implement the assessment; instead, the case studies were carried out in the context of research and development, limiting local involvement and implementation. Nonetheless, the studies provided valuable strategies for employing each step of the SCP assessment and ways to overcome limitations. These included obtaining and using publicly available data resources, collaborating with institutions or organizations with resources, and using expertise to employ the analytical process. In conclusion, the local conservation organization should ultimately decide whether or not to use the SCP approach using reviews such as this one and the feasibility assessment model provided in this chapter. In Chapter 3, to support locally based conservation planning efforts in southwestern Nicaragua, I collaborated with a small NGO and produced valuable data products for conservation planning. I produced a land-use and land cover change (LULC) classification and identified hot and cold spots (i.e., high and low concentration) of land cover change between the years of 2000 - 2009. I used SPOT satellite imagery from 2009, ground referenced data, and manual training points to classify 10 LULC types using a regression tree algorithm. I employed a post-classification change detection analysis to compare my classification to one from the year of 2000, applied a cluster analysis to delineate hot and cold spots of change, and used the resulting data products to identify preliminary conservation and restoration priorities. The LULC classification accuracy was 87.9% and deforestation rates were approximately 5.6% per year. I observed that pasture was the most converted-to class, plantation was a proliferating class, and some regrowth succeeded into secondary forest. Hotspots and cold spots of change for conservation concern included areas converted from forest into pasture, which often occurred in areas of rugged terrain. Hotspots from forest to plantation occurred in the northern isthmus, while cold spots occurred in the south. These two trends revealed the vulnerability of remaining secondary forests, which are of primary importance to regional conservation efforts. Conservation priorities included remaining old secondary forest patches and succeeding forests occurring near them and should factor into future conservation planning.
Incorporating geodiversity into conservation decisions.
Comer, Patrick J; Pressey, Robert L; Hunter, Malcolm L; Schloss, Carrie A; Buttrick, Steven C; Heller, Nicole E; Tirpak, John M; Faith, Daniel P; Cross, Molly S; Shaffer, Mark L
2015-06-01
In a rapidly changing climate, conservation practitioners could better use geodiversity in a broad range of conservation decisions. We explored selected avenues through which this integration might improve decision making and organized them within the adaptive management cycle of assessment, planning, implementation, and monitoring. Geodiversity is seldom referenced in predominant environmental law and policy. With most natural resource agencies mandated to conserve certain categories of species, agency personnel are challenged to find ways to practically implement new directives aimed at coping with climate change while retaining their species-centered mandate. Ecoregions and ecological classifications provide clear mechanisms to consider geodiversity in plans or decisions, the inclusion of which will help foster the resilience of conservation to climate change. Methods for biodiversity assessment, such as gap analysis, climate change vulnerability analysis, and ecological process modeling, can readily accommodate inclusion of a geophysical component. We adapted others' approaches for characterizing landscapes along a continuum of climate change vulnerability for the biota they support from resistant, to resilient, to susceptible, and to sensitive and then summarized options for integrating geodiversity into planning in each landscape type. In landscapes that are relatively resistant to climate change, options exist to fully represent geodiversity while ensuring that dynamic ecological processes can change over time. In more susceptible landscapes, strategies aiming to maintain or restore ecosystem resilience and connectivity are paramount. Implementing actions on the ground requires understanding of geophysical constraints on species and an increasingly nimble approach to establishing management and restoration goals. Because decisions that are implemented today will be revisited and amended into the future, increasingly sophisticated forms of monitoring and adaptation will be required to ensure that conservation efforts fully consider the value of geodiversity for supporting biodiversity in the face of a changing climate. © 2015 Society for Conservation Biology.
Reengineering the project design process
NASA Astrophysics Data System (ADS)
Kane Casani, E.; Metzger, Robert M.
1995-01-01
In response to the National Aeronautics and Space Administration's goal of working faster, better, and cheaper, the Jet Propulsion Laboratory (JPL) has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Development Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center (PDC) and the Flight System Testbed (FST). Reengineering at JPL implies a cultural change whereby the character of the Laboratory's design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and more accurate cost estimating. These improvements signal JPL's commitment to meeting the challenges of space exploration in the next century.
Mission planning and scheduling concept for the Advanced X-ray Astrophysics Facility (AXAF)
NASA Technical Reports Server (NTRS)
Newhouse, M.; Guffin, O. T.
1994-01-01
Projected for launch in the latter part of 1998, the Advanced X-ray Astrophysics Facility (AXAF), the third satellite in the Great Observatory series, promises to dramatically open the x-ray sky as the Hubble and Compton observatories have done in their respective realms. Unlike its companions, however, AXAF will be placed in a high altitude, highly elliptical orbit (10,000 x 100,000 km), and will therefore be subject to its own unique environment, spacecraft and science instrument constraints and communication network interactions. In support of this mission, ground operations personnel have embarked on the development of the AXAF Offline System (OFLS), a body of software divided into four basic functional elements: (1) Mission Planning and Scheduling, (2) Command Management, (3) Altitude Determination and Sensor Calibration and (4) Spacecraft Support and Engineering Analysis. This paper presents an overview concept for one of these major elements, the Mission Planning and Scheduling subsystem (MPS). The derivation of this concept is described in terms of requirements driven by spacecraft and science instrument characteristics, orbital environment and ground system capabilities. The flowdown of these requirements through the systems analysis process and the definition of MPS interfaces has resulted in the modular grouping of functional subelements depicted in the design implementation approach. The rationale for this design solution is explained and capabilities for the initial prototype system are proposed from the user perspective.
Allstadt, Kate E.; Thompson, Eric M.; Wald, David J.; Hamburger, Michael W.; Godt, Jonathan W.; Knudsen, Keith L.; Jibson, Randall W.; Jessee, M. Anna; Zhu, Jing; Hearne, Michael; Baise, Laurie G.; Tanyas, Hakan; Marano, Kristin D.
2016-03-30
The U.S. Geological Survey (USGS) Earthquake Hazards and Landslide Hazards Programs are developing plans to add quantitative hazard assessments of earthquake-triggered landsliding and liquefaction to existing real-time earthquake products (ShakeMap, ShakeCast, PAGER) using open and readily available methodologies and products. To date, prototype global statistical models have been developed and are being refined, improved, and tested. These models are a good foundation, but much work remains to achieve robust and defensible models that meet the needs of end users. In order to establish an implementation plan and identify research priorities, the USGS convened a workshop in Golden, Colorado, in October 2015. This document summarizes current (as of early 2016) capabilities, research and operational priorities, and plans for further studies that were established at this workshop. Specific priorities established during the meeting include (1) developing a suite of alternative models; (2) making use of higher resolution and higher quality data where possible; (3) incorporating newer global and regional datasets and inventories; (4) reducing barriers to accessing inventory datasets; (5) developing methods for using inconsistent or incomplete datasets in aggregate; (6) developing standardized model testing and evaluation methods; (7) improving ShakeMap shaking estimates, particularly as relevant to ground failure, such as including topographic amplification and accounting for spatial variability; and (8) developing vulnerability functions for loss estimates.
Operational Implementation of a 2-Hour Prebreathe Protocol for International Space Station
NASA Technical Reports Server (NTRS)
Waligora, James M.; Conkin, J.; Foster, P. P.; Schneider, S.; Loftin, Karin C.; Gernhardt, Michael L.; Vann, R.
2000-01-01
Procedures, equipment, and analytical techniques were developed to implement the ground tested 2-hour protocol in-flight operations. The methods are: 1) The flight protocol incorporates additional safety margin over the ground tested protocol. This includes up to 20 min of additional time on enriched O2 during suit purge and pressure check, increased duration of extravehicular activity (EVA) preparation exercise during O2 prebreathing (up to 90 min vs; the tested 24 min), and reduced rates of depressurization. The ground test observations were combined with model projections of the conservative measures (using statistical models from Duke University and NASA JSQ to bound the risk of Type I and Type II decompression sickness (DCS). 2) An inflight exercise device using the in-flight ergometer and elastic tubes for upper body exercise was developed to replicate the dual cycle exercise in the ground trials. 3) A new in-flight breathing system was developed and man-tested. 4) A process to monitor inflight experience with the protocol, including the use of an in-suit Doppler bubble monitor when available, was developed. The results are: 1) The model projections of the conservative factors of the operational protocol were shown to reduce the risk of DCS to levels consistent with the observations of no DCS to date in the shuttle program. 2) Cross over trials of the dual cycle ergometer used in ground tests and the in-flight exercise system verified that02consumption and the % division of work between upper and lower body was not significantly different at the p= 0.05 level. 3) The in-flight breathing system was demonstrated to support work rates generating 75% O2(max) in 95 percentile subjects. 4) An in-flight monitoring plan with acceptance criteria was put in place for the 2-hour prebreathe protocol. And the conclusions are: The 2-hour protocol has been approved for flight, and all implementation efforts are in place to allow use of the protocol as early as flight ISS 7A, now scheduled in November of 2000.
Liddy, C; Johnston, S; Irving, H; Nash, K
2013-06-01
With chronic diseases becoming an increasing burden for healthcare systems worldwide, self-management support has gained traction in many health regions and organizations. However, the real-world application of the findings from clinical trials into actual community programming is not self-evident. The aim of this study was to present a model of programme implementation, namely the Community Connection Model. The process of implementing a chronic disease self-management programme has been documented in detail from its initial inception through to a sustainable programme. This account includes a description of the strategic activities undertaken (e.g. alignment with local policy and the formation of community partnerships) and the specific steps taken on the path to programme implementation (e.g. a scoping literature review, an environmental scan and a pilot programme with an evaluation component). Reflection on this case example suggests that a cognizance of the interactions between policy, partnership, planning and programme could act as a useful tool to guide programme implementation, evaluation and sustainability. Multiple types of self-management support have been implemented (as part of the Living Health Champlain programme), and are being evaluated and adapted in response to new evidence, shifting priorities and direction from more partners. The widespread access means that self-management support programmes are becoming part of the culture of care in the study region. Establishing a connection around an important health problem, ensuring active partnerships, adequate planning and early implementation of a programme grounded on the principles of applying best-available evidence can lead to successful solutions. The Community Connection Model is proposed as a way of conceptualizing these processes. Copyright © 2013 The Royal Society for Public Health. Published by Elsevier Ltd. All rights reserved.
Maneuver Planning for Conjunction Risk Mitigation with Ground-track Control Requirements
NASA Technical Reports Server (NTRS)
McKinley, David
2008-01-01
The planning of conjunction Risk Mitigation Maneuvers (RMM) in the presence of ground-track control requirements is analyzed. Past RMM planning efforts on the Aqua, Aura, and Terra spacecraft have demonstrated that only small maneuvers are available when ground-track control requirements are maintained. Assuming small maneuvers, analytical expressions for the effect of a given maneuver on conjunction geometry are derived. The analytical expressions are used to generate a large trade space for initial RMM design. This trade space represents a significant improvement in initial maneuver planning over existing methods that employ high fidelity maneuver models and propagation.
Aeromechanical stability analysis of COPTER
NASA Technical Reports Server (NTRS)
Yin, Sheng K.; Yen, Jing G.
1988-01-01
A plan was formed for developing a comprehensive, second-generation system with analytical capabilities for predicting performance, loads and vibration, handling qualities, aeromechanical stability, and acoustics. This second-generation system named COPTER (COmprehensive Program for Theoretical Evaluation of Rotorcraft) is designed for operational efficiency, user friendliness, coding readability, maintainability, transportability, modularity, and expandability for future growth. The system is divided into an executive, a data deck validator, and a technology complex. At present a simple executive, the data deck validator, and the aeromechanical stability module of the technology complex were implemented. The system is described briefly, the implementation of the technology module is discussed, and correlation data presented. The correlation includes hingeless-rotor isolated stability, hingeless-rotor ground-resonance stability, and air-resonance stability of an advanced bearingless-rotor in forward flight.
Managing Large Scale Project Analysis Teams through a Web Accessible Database
NASA Technical Reports Server (NTRS)
O'Neil, Daniel A.
2008-01-01
Large scale space programs analyze thousands of requirements while mitigating safety, performance, schedule, and cost risks. These efforts involve a variety of roles with interdependent use cases and goals. For example, study managers and facilitators identify ground-rules and assumptions for a collection of studies required for a program or project milestone. Task leaders derive product requirements from the ground rules and assumptions and describe activities to produce needed analytical products. Disciplined specialists produce the specified products and load results into a file management system. Organizational and project managers provide the personnel and funds to conduct the tasks. Each role has responsibilities to establish information linkages and provide status reports to management. Projects conduct design and analysis cycles to refine designs to meet the requirements and implement risk mitigation plans. At the program level, integrated design and analysis cycles studies are conducted to eliminate every 'to-be-determined' and develop plans to mitigate every risk. At the agency level, strategic studies analyze different approaches to exploration architectures and campaigns. This paper describes a web-accessible database developed by NASA to coordinate and manage tasks at three organizational levels. Other topics in this paper cover integration technologies and techniques for process modeling and enterprise architectures.
Publication ethics from the ground up.
DeTora, Lisa; Foster, Cate; Nori, Mukund; Simcoe, Donna; Skobe, Catherine; Toroser, Dikran
2018-02-01
It is relatively easy to begin policy documents with a general assertion that ethics will be followed. Less obvious is how to ensure that day-to-day activities are consonant with ethical standards. We suggest that using day-to-day publication activities as the driver for building policies and procedures can promote ethical practices from the ground up. Although basic principles of ethical publication practice may seem straightforward to some, for others this information may require explanation, interpretation and context. Effective policy development includes big-picture items as well as more day-to-day tactical responsibilities such as those discussed below. Research questions, disciplinary practices, applications and team structures may vary. Thus, no single publication plan or policy solution is right for all teams. It is up to team members to review guidelines for best practices and find the optimal implementation for their situations. Experts in publication management, planning and writing can help large teams manage publication activities. These experts have an obligation to maintain and enhance their skills continually. A strong acumen in publication best practices will allow these publication professionals to better address any possible ethical dilemmas in the future. © 2018 The Authors. International Journal of Clinical Practice Published by John Wiley & Sons Ltd.
Lindsey, Bruce D.; Bickford, Tammy M.
1999-01-01
State agencies responsible for regulating pesticides are required by the U.S. Environmental Protection Agency to develop state management plans for specific pesticides. A key part of these management plans includes assessing the potential for contamination of ground water by pesticides throughout the state. As an example of how a statewide assessment could be implemented, a plan is presented for the Commonwealth of Pennsylvania to illustrate how a hydrogeologic framework can be used as a basis for sampling areas within a state with the highest likelihood of having elevated pesticide concentrations in ground water. The framework was created by subdividing the state into 20 areas on the basis of physiography and aquifer type. Each of these 20 hydrogeologic settings is relatively homogeneous with respect to aquifer susceptibility and pesticide use—factors that would be likely to affect pesticide concentrations in ground water. Existing data on atrazine occurrence in ground water was analyzed to determine (1) which areas of the state already have sufficient samples collected to make statistical comparisons among hydrogeologic settings, and (2) the effect of factors such as land use and aquifer characteristics on pesticide occurrence. The theoretical vulnerability and the results of the data analysis were used to rank each of the 20 hydrogeologic settings on the basis of vulnerability of ground water to contamination by pesticides. Example sampling plans are presented for nine of the hydrogeologic settings that lack sufficient data to assess vulnerability to contamination. Of the highest priority areas of the state, two out of four have been adequately sampled, one of the three areas of moderate to high priority has been adequately sampled, four of the nine areas of moderate to low priority have been adequately sampled, and none of the three low priority areas have been sampled.Sampling to date has shown that, even in the most vulnerable hydrogeologic settings, pesticide concentrations in ground water rarely exceed U.S. Environmental Protection Agency Drinking Water Standards or Health Advisory Levels. Analyses of samples from 1,159 private water supplies reveal only 3 sites for which samples with concentrations of pesticides exceeded drinking-water standards. In most cases, samples with elevated concentrations could be traced to point sources at pesticide loading or mixing areas. These analyses included data from some of the most vulnerable areas of the state, indicating that it is highly unlikely that pesticide concentrations in water from wells in other areas of the state would exceed the drinking-water standards unless a point source of contamination were present. Analysis of existing data showed that water from wells in areas of the state underlain by carbonate (limestone and dolomite) bedrock, which commonly have a high percentage of corn production, was much more likely to have pesticides detected. Application of pesticides to the land surface generally has not caused concentrations of the five state priority pesticides in ground water to exceed health standards; however, this study has not evaluated the potential human health effects of mixtures of pesticides or pesticide degradation products in drinking water. This study also has not determined whether concentrations in ground water are stable, increasing, or decreasing.
Tug fleet and ground operations schedules and controls. Volume 2: part 1
NASA Technical Reports Server (NTRS)
1975-01-01
This Tug Fleet and Ground Operations Schedules and Controls Study addresses both ground operational data and technical requirements that span the Tug planning phase and operations phase. A similar study covering mission operations (by others) provides the complimentary flight operations details. The two studies provide the planning data requirements, resource allocation, and control milestones for supporting the requirements of the STS program. This Tug Fleet and Ground Operations Schedules and Controls Study incorporates the basic ground operations requirements and concepts provided by previous studies with the interrelationships of the planning, IUS transition, and Tug fleet operations phases. The interrelationships of these phases were studied as a system to optimize overall program benefits and minimize operational risk factors.
50 CFR 600.1008 - Implementation plan and implementation regulations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 50 Wildlife and Fisheries 8 2010-10-01 2010-10-01 false Implementation plan and implementation... Capacity Reduction Framework § 600.1008 Implementation plan and implementation regulations. (a) As soon as... period, a proposed implementation plan and implementation regulations. During the public comment period...
Health-sector responses to address the impacts of climate change in Nepal.
Dhimal, Meghnath; Dhimal, Mandira Lamichhane; Pote-Shrestha, Raja Ram; Groneberg, David A; Kuch, Ulrich
2017-09-01
Nepal is highly vulnerable to global climate change, despite its negligible emission of global greenhouse gases. The vulnerable climate-sensitive sectors identified in Nepal's National Adaptation Programme of Action (NAPA) to Climate Change 2010 include agriculture, forestry, water, energy, public health, urbanization and infrastructure, and climate-induced disasters. In addition, analyses carried out as part of the NAPA process have indicated that the impacts of climate change in Nepal are not gender neutral. Vector-borne diseases, diarrhoeal diseases including cholera, malnutrition, cardiorespiratory diseases, psychological stress, and health effects and injuries related to extreme weather are major climate-sensitive health risks in the country. In recent years, research has been done in Nepal in order to understand the changing epidemiology of diseases and generate evidence for decision-making. Based on this evidence, the experience of programme managers, and regular surveillance data, the Government of Nepal has mainstreamed issues related to climate change in development plans, policies and programmes. In particular, the Government of Nepal has addressed climate-sensitive health risks. In addition to the NAPA report, several policy documents have been launched, including the Climate Change Policy 2011; the Nepal Health Sector Programme - Implementation Plan II (NHSP-IP 2) 2010-2015; the National Health Policy 2014; the National Health Sector Strategy 2015-2020 and its implementation plan (2016-2021); and the Health National Adaptation Plan (H-NAP): climate change and health strategy and action plan (2016-2020). However, the translation of these policies and plans of action into tangible action on the ground is still in its infancy in Nepal. Despite this, the health sector's response to addressing the impact of climate change in Nepal may be taken as a good example for other low- and middle-income countries.
Centralized mission planning and scheduling system for the Landsat Data Continuity Mission
Kavelaars, Alicia; Barnoy, Assaf M.; Gregory, Shawna; Garcia, Gonzalo; Talon, Cesar; Greer, Gregory; Williams, Jason; Dulski, Vicki
2014-01-01
Satellites in Low Earth Orbit provide missions with closer range for studying aspects such as geography and topography, but often require efficient utilization of space and ground assets. Optimizing schedules for these satellites amounts to a complex planning puzzle since it requires operators to face issues such as discontinuous ground contacts, limited onboard memory storage, constrained downlink margin, and shared ground antenna resources. To solve this issue for the Landsat Data Continuity Mission (LDCM, Landsat 8), all the scheduling exchanges for science data request, ground/space station contact, and spacecraft maintenance and control will be coordinated through a centralized Mission Planning and Scheduling (MPS) engine, based upon GMV’s scheduling system flexplan9 . The synchronization between all operational functions must be strictly maintained to ensure efficient mission utilization of ground and spacecraft activities while working within the bounds of the space and ground resources, such as Solid State Recorder (SSR) and available antennas. This paper outlines the functionalities that the centralized planning and scheduling system has in its operational control and management of the Landsat 8 spacecraft.
Planning School Grounds for Outdoor Learning
ERIC Educational Resources Information Center
Wagner, Cheryl; Gordon, Douglas
2010-01-01
This publication covers the planning and design of school grounds for outdoor learning in new and existing K-12 facilities. Curriculum development as well as athletic field planning and maintenance are not covered although some references on these topics are provided. It discusses the different types of outdoor learning environments that can be…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cooper, D.W.; Murphy, M.; Rimmel, G.
1994-08-01
NATO and former Warsaw Pact nations have agreed to allow overflights of their countries in the interest of easing world tension. The United States has decided to implement two C-135 aircraft with a Synthetic Aperture Radar (SAR) that has a 3-meter resolution. This work is being sponsored by the Defense Nuclear Agency (DNA) and will be operational in Fall 1995. Since the SAR equipment must be exportable to foreign nations, a 20-year-old UPD-8 analog SAR system was selected as the front-end and refurbished for this application by Loral Defense Systems. Data processing is being upgraded to a currently exportable digitalmore » design by Sandia National Laboratories. Amplitude and phase histories will be collected during these overflights and digitized on VHS cassettes. Ground stations will use reduction algorithms to process the data and convert it to magnitude-detected images for member nations. System Planning Corporation is presently developing a portable ground station for use on the demonstration flights. Aircraft integration into the C-135 aircraft is being done by the Air Force at Wright-Patterson AFB, Ohio.« less
Using virtual reality for science mission planning: A Mars Pathfinder case
NASA Technical Reports Server (NTRS)
Kim, Jacqueline H.; Weidner, Richard J.; Sacks, Allan L.
1994-01-01
NASA's Mars Pathfinder Project requires a Ground Data System (GDS) that supports both engineering and scientific payloads with reduced mission operations staffing, and short planning schedules. Also, successful surface operation of the lander camera requires efficient mission planning and accurate pointing of the camera. To meet these challenges, a new software strategy that integrates virtual reality technology with existing navigational ancillary information and image processing capabilities. The result is an interactive workstation based applications software that provides a high resolution, 3-dimensial, stereo display of Mars as if it were viewed through the lander camera. The design, implementation strategy and parametric specification phases for the development of this software were completed, and the prototype tested. When completed, the software will allow scientists and mission planners to access simulated and actual scenes of Mars' surface. The perspective from the lander camera will enable scientists to plan activities more accurately and completely. The application will also support the sequence and command generation process and will allow testing and verification of camera pointing commands via simulation.
2014-04-10
CAPE CANAVERAL, Fla. -- At the Kennedy Space Center in Florida, Trey Carlson, the spaceport's master planner, describes how the Center Planning and Development Directorate CPD is working to help transform Kennedy into a multi-user spaceport through partnerships and resource planning. The event was first of what is planned to be quarterly meetings between NASA's industry partners and representatives of Kennedy's CPD, Safety and Mission Assurance, International Space Station Ground Processing, Chief Financial officer and Ground Processing and Ground Systems Development and Operations directorates. Center Planning and Development is the “front door” for partnerships with NASA’s Kennedy Space Center. Kennedy is now developing the world’s premier spaceport for government and commercial space industries using comprehensive resource planning and partnerships. Photo credit: NASA/Daniel Casper
2014-04-10
CAPE CANAVERAL, Fla. -- At the Kennedy Space Center in Florida, Trey Carlson, the spaceport's master planner, describes how the Center Planning and Development Directorate CPD is working to help transform Kennedy into a multi-user spaceport through partnerships and resource planning. The event was first of what is planned to be quarterly meetings between NASA's industry partners and representatives of Kennedy's CPD, Safety and Mission Assurance, International Space Station Ground Processing, Chief Financial officer and Ground Processing and Ground Systems Development and Operations directorates. Center Planning and Development is the “front door” for partnerships with NASA’s Kennedy Space Center. Kennedy is now developing the world’s premier spaceport for government and commercial space industries using comprehensive resource planning and partnerships. Photo credit: NASA/Daniel Casper
Exploring Cognition Using Software Defined Radios for NASA Missions
NASA Technical Reports Server (NTRS)
Mortensen, Dale J.; Reinhart, Richard C.
2016-01-01
NASA missions typically operate using a communication infrastructure that requires significant schedule planning with limited flexibility when the needs of the mission change. Parameters such as modulation, coding scheme, frequency, and data rate are fixed for the life of the mission. This is due to antiquated hardware and software for both the space and ground assets and a very complex set of mission profiles. Automated techniques in place by commercial telecommunication companies are being explored by NASA to determine their usability by NASA to reduce cost and increase science return. Adding cognition the ability to learn from past decisions and adjust behavior is also being investigated. Software Defined Radios are an ideal way to implement cognitive concepts. Cognition can be considered in many different aspects of the communication system. Radio functions, such as frequency, modulation, data rate, coding and filters can be adjusted based on measurements of signal degradation. Data delivery mechanisms and route changes based on past successes and failures can be made to more efficiently deliver the data to the end user. Automated antenna pointing can be added to improve gain, coverage, or adjust the target. Scheduling improvements and automation to reduce the dependence on humans provide more flexible capabilities. The Cognitive Communications project, funded by the Space Communication and Navigation Program, is exploring these concepts and using the SCaN Testbed on board the International Space Station to implement them as they evolve. The SCaN Testbed contains three Software Defined Radios and a flight computer. These four computing platforms, along with a tracking antenna system and the supporting ground infrastructure, will be used to implement various concepts in a system similar to those used by missions. Multiple universities and SBIR companies are supporting this investigation. This paper will describe the cognitive system ideas under consideration and the plan for implementing them on platforms, including the SCaN Testbed. Discussions in the paper will include how these concepts might be used to reduce cost and improve the science return for NASA missions.
Spacelab operations planning. [ground handling, launch, flight and experiments
NASA Technical Reports Server (NTRS)
Lee, T. J.
1976-01-01
The paper reviews NASA planning in the fields of ground, launch and flight operations and experiment integration to effectively operate Spacelab. Payload mission planning is discussed taking consideration of orbital analysis and the mission of a multiuser payload which may be either single or multidiscipline. Payload analytical integration - as active process of analyses to ensure that the experiment payload is compatible to the mission objectives and profile ground and flight operations and that the resource demands upon Spacelab can be satisfied - is considered. Software integration is touched upon and the major integration levels in ground operational processing of Spacelab and its experimental payloads are examined. Flight operations, encompassing the operation of the Space Transportation System and the payload, are discussed as are the initial Spacelab missions. Charts and diagrams are presented illustrating the various planning areas.
40 CFR 265.92 - Sampling and analysis.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Sampling and analysis. 265.92 Section... FACILITIES Ground-Water Monitoring § 265.92 Sampling and analysis. (a) The owner or operator must obtain and... follow a ground-water sampling and analysis plan. He must keep this plan at the facility. The plan must...
40 CFR 265.92 - Sampling and analysis.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Sampling and analysis. 265.92 Section... FACILITIES Ground-Water Monitoring § 265.92 Sampling and analysis. (a) The owner or operator must obtain and... follow a ground-water sampling and analysis plan. He must keep this plan at the facility. The plan must...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-24
... Haze State Implementation Plan; Federal Implementation Plan for Regional Haze AGENCY: Environmental... (SIP) revision submitted by the State of Wyoming on January 12, 2011, that addresses regional haze...; Regional Haze State Implementation Plan; Federal Implementation Plan for Regional Haze; Proposed Rule (77...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-16
... Promulgation of Implementation Plans; North Carolina; State Implementation Plan Miscellaneous Revisions AGENCY... a revision to the North Carolina State Implementation Plan submitted on February 3, 2010, through... particulate matter found in the Code of Federal Regulations. In the Final Rules Section of this Federal...
Managing a big ground-based astronomy project: the Thirty Meter Telescope (TMT) project
NASA Astrophysics Data System (ADS)
Sanders, Gary H.
2008-07-01
TMT is a big science project and its scale is greater than previous ground-based optical/infrared telescope projects. This paper will describe the ideal "linear" project and how the TMT project departs from that ideal. The paper will describe the needed adaptations to successfully manage real world complexities. The progression from science requirements to a reference design, the development of a product-oriented Work Breakdown Structure (WBS) and an organization that parallels the WBS, the implementation of system engineering, requirements definition and the progression through Conceptual Design to Preliminary Design will be summarized. The development of a detailed cost estimate structured by the WBS, and the methodology of risk analysis to estimate contingency fund requirements will be summarized. Designing the project schedule defines the construction plan and, together with the cost model, provides the basis for executing the project guided by an earned value performance measurement system.
Coupling systematic planning and expert judgement enhances the efficiency of river restoration.
Langhans, Simone D; Gessner, Jörn; Hermoso, Virgilio; Wolter, Christian
2016-08-01
Ineffectiveness of current river restoration practices hinders the achievement of ecological quality targets set by country-specific regulations. Recent advances in river restoration help planning efforts more systematically to reach ecological targets at the least costs. However, such approaches are often desktop-based and overlook real-world constraints. We argue that combining two techniques commonly used in the conservation arena - expert judgement and systematic planning - will deliver cost-effective restoration plans with a high potential for implementation. We tested this idea targeting the restoration of spawning habitat, i.e. gravel bars, for 11 rheophilic fish species along a river system in Germany (Havel-Spree rivers). With a group of local fish experts, we identified the location and extent of potential gravel bars along the rivers and necessary improvements to migration barriers to ensure fish passage. Restoration cost of each gravel bar included the cost of the action itself plus a fraction of the cost necessary to ensure longitudinal connectivity by upgrading or building fish passages located downstream. We set restoration targets according to the EU Water Framework Directive, i.e. relative abundance of 11 fish species in the reference community and optimised a restoration plan by prioritising a subset of restoration sites from the full set of identified sites, using the conservation planning software Marxan. Out of the 66 potential gravel bars, 36 sites which were mainly located in the downstream section of the system were selected, reflecting their cost-effectiveness given that fewer barriers needed intervention. Due to the limited overall number of sites that experts identified as being suitable for restoring spawning habitat, reaching abundance-targets was challenged. We conclude that coupling systematic river restoration planning with expert judgement produces optimised restoration plans that account for on-the-ground implementation constraints. If applied, this approach has a high potential to enhance overall efficiency of future restoration efforts. Copyright © 2016 Elsevier B.V. All rights reserved.
Joint operations planning for space surveillance missions on the MSX satellite
NASA Technical Reports Server (NTRS)
Stokes, Grant; Good, Andrew
1994-01-01
The Midcourse Space Experiment (MSX) satellite, sponsored by BMDO, is intended to gather broad-band phenomenology data on missiles, plumes, naturally occurring earthlimb backgrounds and deep space backgrounds. In addition the MSX will be used to conduct functional demonstrations of space-based space surveillance. The JHU/Applied Physics Laboratory (APL), located in Laurel, MD, is the integrator and operator of the MSX satellite. APL will conduct all operations related to the MSX and is charged with the detailed operations planning required to implement all of the experiments run on the MSX except the space surveillance experiments. The non-surveillance operations are generally amenable to being defined months ahead of time and being scheduled on a monthly basis. Lincoln Laboratory, Massachusetts Institute of Technology (LL), located in Lexington, MA, is the provider of one of the principle MSX instruments, the Space-Based Visible (SBV) sensor, and the agency charged with implementing the space surveillance demonstrations on the MSX. The planning timelines for the space surveillance demonstrations are fundamentally different from those for the other experiments. They are generally amenable to being scheduled on a monthly basis, but the specific experiment sequence and pointing must be refined shortly before execution. This allocation of responsibilities to different organizations implies the need for a joint mission planning system for conducting space surveillance demonstrations. This paper details the iterative, joint planning system, based on passing responsibility for generating MSX commands for surveillance operations from APL to LL for specific scheduled operations. The joint planning system, including the generation of a budget for spacecraft resources to be used for surveillance events, has been successfully demonstrated during ground testing of the MSX and is being validated for MSX launch within the year. The planning system developed for the MSX forms a model possibly applicable to developing distributed mission planning systems for other multi-use satellites.
Cryogenic Fluid Transfer for Exploration
NASA Technical Reports Server (NTRS)
Chato, David J.
2007-01-01
This paper discusses current plans and issues for exploration that involve the use of cryogenic transfer. The benefits of cryogenic transfer to exploration missions are examined. The current state of the art of transfer technology is reviewed. Mission concepts of operation for exploration are presented, and used to qualitatively discuss the performance benefits of transfer. The paper looks at the challenges faced to implement a cryogenic transfer system and suggest approaches to address them with advanced development research. Transfer rates required for exploration are shown to have already been achieved in ground test. Cost effective approaches to the required on-orbit demonstration are suggested.
Cryogenic Fluid Transfer for Exploration
NASA Technical Reports Server (NTRS)
Chato, David J.
2008-01-01
This paper discusses current plans and issues for exploration that involve the use of cryogenic transfer. The benefits of cryogenic transfer to exploration missions are examined. The current state of the art of transfer technology is reviewed. Mission concepts of operation for exploration are presented, and used to qualitatively discuss the performance benefits of transfer. The paper looks at the challenges faced to implement a cryogenic transfer system and suggest approaches to address them with advanced development research. Transfer rates required for exploration are shown to have already been achieved in ground test. Cost-effective approaches to the required on-orbit demonstration are suggested.
The Telecommunications and Data Acquisition Report
NASA Technical Reports Server (NTRS)
Yuen, Joseph H. (Editor)
1994-01-01
This quarterly publication provides archival reports on developments in programs managed by JPL's Telecommunications and Mission Operations Directorate (TMOD), which now includes the former Telecommunications and Data Acquisition (TDA) Office. In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DS) in planning, supporting research and technology, implementation, and operations. Also included are standards activity at JPL for space data and information systems and reimbursable DSN work performed for other space agencies through NASA. The preceding work is all performed for NASA's Office of Space Communications (OSC).
NASA's post-Challenger safety program - Themes and thrusts
NASA Technical Reports Server (NTRS)
Rodney, G. A.
1988-01-01
The range of managerial, technical, and procedural initiatives implemented by NASA's post-Challenger safety program is reviewed. The recommendations made by the Rogers Commission, the NASA post-Challenger review of Shuttle design, the Congressional investigation of the accident, the National Research Council, the Aerospace Safety Advisory Panel, and NASA internal advisory panels and studies are summarized. NASA safety initiatives regarding improved organizational accountability for safety, upgraded analytical techniques and methodologies for risk assessment and management, procedural initiatives in problem reporting and corrective-action tracking, ground processing, maintenance documentation, and improved technologies are discussed. Safety issues relevant to the planned Space Station are examined.
The Telecommunications and Data Acquisition Report
NASA Technical Reports Server (NTRS)
Yuen, Joseph H. (Editor)
1995-01-01
This quarterly publication provides archival reports on developments in programs managed by JPL's Telecommunications and Mission Operations Directorate (TMOD), which now includes the former Telecommunications and Data Acquisition (TDA) Office. In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DSN) in planning, supporting research and technology, implementation, and operations. Also included are standards activity at JPL for space data and information systems and reimbursable DSN work performed for other space agencies through NASA. The preceding work is all performed for NASA's Office of Space Communications (OSC).
Approved Air Quality Implementation Plans in Region 10
Landing page for information about EPA-approved air quality State Implementation Plans (SIPs), Tribal Implementation Plans (TIPs), and Federal Implementation Plans (FIPs) in Alaska, Idaho, Oregon, Washington.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-20
...] Approval and Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision AGENCY...) is proposing to approve a revision to the New York State Implementation Plan (SIP) for ozone... air quality standards for ozone. DATES: Comments must be received on or before December 20, 2013...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-08
... Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision AGENCY: Environmental... a proposed revision to the New York State Implementation Plan (SIP) for ozone concerning the control... national ambient air quality standards for ozone. DATES: Effective Date: This rule will be effective April...
Utilization of the International Space Station for Crew Autonomous Scheduling Test (CAST)
NASA Technical Reports Server (NTRS)
Healy, Matthew; Marquez, Jesica; Hillenius, Steven; Korth, David; Bakalyar, Laure Rush; Woodbury, Neil; Larsen, Crystal M.; Bates, Shelby; Kockler, Mikayla; Rhodes, Brooke;
2017-01-01
The United States space policy is evolving toward missions beyond low Earth orbit. In an effort to meet that policy, NASA has recognized Autonomous Mission Operations (AMO) as a valuable capability. Identified within AMO capabilities is the potential for autonomous planning and replanning during human spaceflight operations. That is allowing crew members to collectively or individually participate in the development of their own schedules. Currently, dedicated mission operations planners collaborate with international partners to create daily plans for astronauts aboard the International Space Station (ISS), taking into account mission requirements, ground rules, and various vehicle and payload constraints. In future deep space operations the crew will require more independence from ground support due to communication transmission delays. Furthermore, crew members who are provided with the capability to schedule their own activities are able to leverage direct experience operating in the space environment, and possibly maximize their efficiency. CAST (Crew Autonomous Scheduling Test) is an ISS investigation designed to analyze three important hypotheses about crew autonomous scheduling. First, given appropriate inputs, the crew is able to create and execute a plan in a reasonable period of time without impacts to mission success. Second, the proximity of the planner, in this case the crew, to the planned operations increases their operational efficiency. Third, crew members are more satisfied when given a role in plan development. This paper presents the results from a single astronaut test subject who participated in five CAST sessions. The details on the operational philosophy of CAST are discussed, including the approach to crew training, selection criteria for test days, and data collection methods. CAST is a technology demonstration payload sponsored by the ISS Research Science and Technology Office, and performed by experts in Mission Operations Planning from the Flight Operations Directorate at NASA Johnson Space Center, and researchers across multiple NASA centers. It is hoped the results of this investigation will guide NASA's implementation of autonomous mission operations for long duration human space missions to Mars and beyond.
Towards a resilience management framework for complex enterprise systems upgrade implementation
NASA Astrophysics Data System (ADS)
Teoh, Say Yen; Yeoh, William; Zadeh, Hossein Seif
2017-05-01
The lack of knowledge of how resilience management supports enterprise system (ES) projects accounts for the failure of firms to leverage their investments in costly ES implementations. Using a structured-pragmatic-situational (SPS) case study research approach, this paper reports on an investigation into the resilience management of a large utility company as it implemented an ES upgrade. Drawing on the literature and on the case study findings, we developed a process-based resilience management framework that involves three strategies (developing situation awareness, demystifying threats, and executing restoration plans) and four organisational capabilities that transform resilience management concepts into practices. We identified the crucial phases of ES upgrade implementation and developed indicators for how different strategies and capabilities of resilience management can assist managers at different stages of an ES upgrade. This research advances the state of existing knowledge by providing specific and verifiable propositions for attaining a state of resilience, the knowledge being grounded in the empirical reality of a case study. Moreover, the framework offers ES practitioners a roadmap to better identify appropriate responses and levels of preparedness.
Situational analysis and future directions of AYUSH: An assessment through 5-year plans of India
Samal, Janmejaya
2015-01-01
AYUSH is an acronym for Ayurveda, Yoga and Naturopathy, Unani, Siddha, and Homeopathy. These are the six indigenous systems of medicine practiced in India. A department called Department of Indian System of medicine was created in March 1995 and renamed to AYUSH in November 2003 with a focus to provide increased attention for the development of these systems. Very recently, in 2014, a separate ministry was created under the union Government of India, which is headed by a minister of state. Planning regarding these systems of medicine was a part of 5-year planning process since 1951. Since then many developments have happened in this sector albeit the system was struggling with a great degree of uncertainty at the time of 1st5-year plan. A progressive path of development could be observed since the first to the 12th5-year plan. It was up to the 7thplan the growth was little sluggish and from 8thplan onward the growth took its pace and several innovative development processes could be observed thereafter. The system is gradually progressing ahead with a vision to be a globally accepted system, as envisaged in 11th5-year plan. Currently, AYUSH system is a part of mainstream health system implemented under National Rural Health Mission (NRHM). NRHM came into play in 2005 but implemented at ground level in 2006 and introduced the scheme of “Mainstreaming of AYUSH and revitalization of local health traditions” to strengthen public health services. This scheme is currently in operation in its second phase, since 1stApril 2012, with the 12th5-year plan. The scheme was primarily brought in to operation with three important objectives; choice of treatment system to the patients, strengthen facility functionally and strengthen the implementation of national health programmes, however, in some places it seems to be a forced medical pluralism owing to a top-down approach by the union government without considerable involvement of the concerned community. In this study, the 5-year planning documents have been reviewed, from the 1stplan to 12thplan, to enable reflection and throw some light into the future directions of AYUSH system. PMID:26649240
Transboundary impacts on regional ground water modeling in Texas
Rainwater, K.; Stovall, J.; Frailey, S.; Urban, L.
2005-01-01
Recent legislation required regional grassroots water resources planning across the entire state of Texas. The Texas Water Development Board (TWDB), the state's primary water resource planning agency, divided the state into 16 planning regions. Each planning group developed plans to manage both ground water and surface water sources and to meet future demands of various combinations of domestic, agricultural, municipal, and industrial water consumers. This presentation describes the challenges in developing a ground water model for the Llano Estacado Regional Water Planning Group (LERWPG), whose region includes 21 counties in the Southern High Plains of Texas. While surface water is supplied to several cities in this region, the vast majority of the regional water use comes from the High Plains aquifer system, often locally referred to as the Ogallala Aquifer. Over 95% of the ground water demand is for irrigated agriculture. The LERWPG had to predict the impact of future TWDB-projected water demands, as provided by the TWDB, on the aquifer for the period 2000 to 2050. If detrimental impacts were noted, alternative management strategies must be proposed. While much effort was spent on evaluating the current status of the ground water reserves, an appropriate numerical model of the aquifer system was necessary to demonstrate future impacts of the predicted withdrawals as well as the effects of the alternative strategies. The modeling effort was completed in the summer of 2000. This presentation concentrates on the political, scientific, and nontechnical issues in this planning process that complicated the modeling effort. Uncertainties in data, most significantly in distribution and intensity of recharge and withdrawals, significantly impacted the calibration and predictive modeling efforts. Four predictive scenarios, including baseline projections, recurrence of the drought of record, precipitation enhancement, and reduced irrigation demand, were simulated to identify counties at risk of low final ground water storage volume or low levels of satisfied demand by 2050. Copyright ?? 2005 National Ground Water Association.
An interagency space nuclear propulsion safety policy for SEI - Issues and discussion
NASA Technical Reports Server (NTRS)
Marshall, A. C.; Sawyer, J. C., Jr.
1991-01-01
An interagency Nuclear Safety Policy Working Group (NSPWG) was chartered to recommend nuclear safety policy, requirements, and guidelines for the Space Exploration Initiative nuclear propulsion program to facilitate the implementation of mission planning and conceptual design studies. The NSPWG developed a top level policy to provide the guiding principles for the development and implementation of the nuclear propulsion safety program and the development of Safety Functional Requirements. In addition, the NSPWG reviewed safety issues for nuclear propulsion and recommended top level safety requirements and guidelines to address these issues. Safety topics include reactor start-up, inadvertent criticality, radiological release and exposure, disposal, entry, safeguards, risk/reliability, operational safety, ground testing, and other considerations. In this paper the emphasis is placed on the safety policy and the issues and considerations that are addressed by the NSPWG recommendations.
Alternative Approaches to Mission Control Automation at NASA's Goddard Space Flight Center
NASA Technical Reports Server (NTRS)
Rackley, Michael; Cooter, Miranda; Davis, George; Mackey, Jennifer
2001-01-01
To meet its objective of reducing operations costs without incurring a corresponding increase in risk, NASA is seeking new methods to automate mission operations. This paper examines the state of the art in automating ground operations for space missions. A summary of available technologies and methods for automating mission operations is provided. Responses from interviews with several space mission FOTs (Flight Operations Teams) to assess the degree and success of those technologies and methods implemented are presented. Mission operators that were interviewed approached automation using different tools and methods resulting in varying degrees of success - from nearly completely automated to nearly completely manual. Two key criteria for successful automation are the active participation of the FOT in the planning, designing, testing, and implementation of the system and the relative degree of complexity of the mission.
NSPWG-recommended safety requirements and guidelines for SEI nuclear propulsion
NASA Technical Reports Server (NTRS)
Marshall, Albert C.; Sawyer, J. C., Jr.; Bari, Robert A.; Brown, Neil W.; Cullingford, Hatice S.; Hardy, Alva C.; Lee, James H.; Mcculloch, William H.; Niederauer, George F.; Remp, Kerry
1992-01-01
An interagency Nuclear Safety Policy Working Group (NSPWG) was chartered to recommend nuclear safety policy, requirements, and guidelines for the Space Exploration Initiative (SEI) nuclear propulsion program to facilitate the implementation of mission planning and conceptual design studies. The NSPWG developed a top-level policy to provide the guiding principles for the development and implementation of the nuclear propulsion safety program and the development of safety functional requirements. In addition, the NSPWG reviewed safety issues for nuclear propulsion and recommended top-level safety requirements and guidelines to address these issues. Safety requirements were developed for reactor start-up, inadvertent criticality, radiological release and exposure, disposal, entry, and safeguards. Guidelines were recommended for risk/reliability, operational safety, flight trajectory and mission abort, space debris and meteoroids, and ground test safety. In this paper the specific requirements and guidelines will be discussed.
Ground Floor Plan (Section A) U.S. Veterans Hospital, Jefferson ...
Ground Floor Plan (Section A) - U.S. Veterans Hospital, Jefferson Barracks, Spinal Cord Injury Unit and Tuberculosis Neuropsychiatric Building, VA Medical Center, Jefferson Barracks Division 1 Jefferson Barracks Drive, Saint Louis, Independent City, MO
Ground Floor Plan (Section B) U.S. Veterans Hospital, Jefferson ...
Ground Floor Plan (Section B) - U.S. Veterans Hospital, Jefferson Barracks, Spinal Cord Injury Unit and Tuberculosis Neuropsychiatric Building, VA Medical Center, Jefferson Barracks Division 1 Jefferson Barracks Drive, Saint Louis, Independent City, MO
UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-09-01
Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Durango, Colorado, are described in this water sampling and analysis plan. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine monitoring stations at the site. The ground water data are used to characterize the site ground water compliance strategies and to monitor contaminants of potential concern identified in the baseline risk assessment (DOE, 1995a). Regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from themore » US EPA regulations in 40 CFR Part 192 (1994) and EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site.« less
U. S. Atlantic Fleet, Eighth Amphibious Force. Operation Plan Number 2-44
1944-01-01
distributed with this Operation Order. (c) Panoramic Bench Sketches No. P-l for Boach 259 and No. P~3 for Loach 26l (South) givo viator level...To indicate tank or ID targets. (g) Green Cluster, White Cluster - Lift Artillery fire. Page 32 of 33. ANNEX KENS . GTMFIRS SUPPORT PLAN. TABLE VI...AURORA . SFCP 5 AUX GROUND SPOT - LIVERMORS SFCP 6 AUX GROUND SPOT - LA GLOIRE SFCP 7 AUX GROUND -SPOT ~ TERM- ERIC SFCP 8 AUX GROUND SPOT - ORION-KEAR
Integrated Operations Architecture Technology Assessment Study
NASA Technical Reports Server (NTRS)
2001-01-01
As part of NASA's Integrated Operations Architecture (IOA) Baseline, NASA will consolidate all communications operations. including ground-based, near-earth, and deep-space communications, into a single integrated network. This network will make maximum use of commercial equipment, services and standards. It will be an Internet Protocol (IP) based network. This study supports technology development planning for the IOA. The technical problems that may arise when LEO mission spacecraft interoperate with commercial satellite services were investigated. Commercial technology and services that could support the IOA were surveyed, and gaps in the capability of existing technology and techniques were identified. Recommendations were made on which gaps should be closed by means of NASA research and development funding. Several findings emerged from the interoperability assessment: in the NASA mission set, there is a preponderance of small. inexpensive, low data rate science missions; proposed commercial satellite communications services could potentially provide TDRSS-like data relay functions; and. IP and related protocols, such as TCP, require augmentation to operate in the mobile networking environment required by the space-to-ground portion of the IOA. Five case studies were performed in the technology assessment. Each case represented a realistic implementation of the near-earth portion of the IOA. The cases included the use of frequencies at L-band, Ka-band and the optical spectrum. The cases also represented both space relay architectures and direct-to-ground architectures. Some of the main recommendations resulting from the case studies are: select an architecture for the LEO/MEO communications network; pursue the development of a Ka-band space-qualified transmitter (and possibly a receiver), and a low-cost Ka-band ground terminal for a direct-to-ground network, pursue the development of an Inmarsat (L-band) space-qualified transceiver to implement a global, low data rate network for LEO/MEO, mission spacecraft; and, pursue developmental research for a miniaturized, high data rate optical transceiver.
Evaluating perceived benefits of ecoregional assessments.
Bottrill, Madeleine C; Mills, Morena; Pressey, Robert L; Game, Edward T; Groves, Craig
2012-10-01
The outcomes of systematic conservation planning (process of assessing, implementing, and managing conservation areas) are rarely reported or measured formally. A lack of consistent or rigorous evaluation in conservation planning has fueled debate about the extent to which conservation assessment (identification, design, and prioritization of potential conservation areas) ultimately influences actions on the ground. We interviewed staff members of a nongovernmental organization, who were involved in 5 ecoregional assessments across North and South America and the Asia-Pacific region. We conducted 17 semistructured interviews with open and closed questions about the perceived purpose, outputs, and outcomes of the ecoregional assessments in which respondents were involved. Using qualitative data collected from those interviews, we investigated the types and frequency of benefits perceived to have emerged from the ecoregional assessments and explored factors that might facilitate or constrain the flow of benefits. Some benefits reflected the intended purpose of ecoregional assessments. Other benefits included improvements in social interactions, attitudes, and institutional knowledge. Our results suggest the latter types of benefits enable ultimate benefits of assessments, such as guiding investments by institutional partners. Our results also showed a clear divergence between the respondents' expectations and perceived outcomes of implementation of conservation actions arising from ecoregional assessments. Our findings suggest the need for both a broader perspective on the contribution of assessments to planning goals and further evaluation of conservation assessments. ©2012 Society for Conservation Biology.
Approved Air Quality Implementation Plans in The Virgin Islands
This site contains information about air quality regulations called State Implementation Plans (SIPs), Federal Implementation Plans (FIPs), and Tribal Implementation Plans (TIPs) approved by EPA within the U.S. Virgin Islands.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-13
... Promulgation of Air Quality Implementation Plans; Pennsylvania; Regional Haze State Implementation Plan...'s limited approval of Pennsylvania's Regional Haze State Implementation Plan (SIP). DATES: Effective... announcing our limited approval of Pennsylvania's Regional Haze SIP. In this document, we inadvertently...
8. Photocopy of Station Grounding drawing showing floor plans (from ...
8. Photocopy of Station Grounding drawing showing floor plans (from the BPA Engineering Vault, Drawing 005319, 3 May 1939) - Bonneville Power Administration South Bank Substation, I-84, South of Bonneville Dam Powerhouse, Bonneville, Multnomah County, OR
Rozenblum, Ronen; Jang, Yeona; Zimlichman, Eyal; Salzberg, Claudia; Tamblyn, Melissa; Buckeridge, David; Forster, Alan; Bates, David W; Tamblyn, Robyn
2011-03-22
In 2001, Canada Health Infoway unveiled a plan to implement a national system of interoperable electronic health records. This government-funded corporation introduced a novel model for interprovincial/territorial collaboration to establish core aspects of a national framework. Despite this $1.6 billion initiative, Canada continues to lag behind other Western countries in adopting electronic health records. We conducted a study to identify the success of different aspects of the Canadian plan and ways to improve the adoption of electronic health records. We used a case study approach to assess the 10-year history of Canada's e-health plan. National reports and documents were reviewed, and structured interviews were conducted with 29 key stakeholders representing national and provincial organizations responsible for establishing policy and strategic direction for health information technology. Using grounded theory, we analyzed transcripts of the interviews to identify themes and their relationships. Key stakeholders identified funding, national standards, patient registries and digital imaging as important achievements of the e-health plan. Lack of an e-health policy, inadequate involvement of clinicians, failure to establish a business case for using electronic health records, a focus on national rather than regional interoperability, and inflexibility in approach were seen as barriers to adoption of the plan. To accelerate adoption of electronic health records and timely return on investment, an e-health policy needs to be tightly aligned with the major strategic directions of health care reform. Adoption needs to be actively fostered through a bottom-up, clinical-needs-first approach, a national policy for investment in electronic health records, and financial incentives based on patient outcomes that can be achieved with electronic health records.
Rozenblum, Ronen; Jang, Yeona; Zimlichman, Eyal; Salzberg, Claudia; Tamblyn, Melissa; Buckeridge, David; Forster, Alan; Bates, David W.; Tamblyn, Robyn
2011-01-01
Background In 2001, Canada Health Infoway unveiled a plan to implement a national system of interoperable electronic health records. This government-funded corporation introduced a novel model for interprovincial/territorial collaboration to establish core aspects of a national framework. Despite this $1.6 billion initiative, Canada continues to lag behind other Western countries in adopting electronic health records. We conducted a study to identify the success of different aspects of the Canadian plan and ways to improve the adoption of electronic health records. Methods We used a case study approach to assess the 10-year history of Canada’s e-health plan. National reports and documents were reviewed, and structured interviews were conducted with 29 key stakeholders representing national and provincial organizations responsible for establishing policy and strategic direction for health information technology. Using grounded theory, we analyzed transcripts of the interviews to identify themes and their relationships. Results Key stakeholders identified funding, national standards, patient registries and digital imaging as important achievements of the e-health plan. Lack of an e-health policy, inadequate involvement of clinicians, failure to establish a business case for using electronic health records, a focus on national rather than regional interoperability, and inflexibility in approach were seen as barriers to adoption of the plan. Interpretation To accelerate adoption of electronic health records and timely return on investment, an e-health policy needs to be tightly aligned with the major strategic directions of health care reform. Adoption needs to be actively fostered through a bottom-up, clinical-needs-first approach, a national policy for investment in electronic health records, and financial incentives based on patient outcomes that can be achieved with electronic health records. PMID:21343262
Ground-water resources in the tri-state region adjacent to the Lower Delaware River
Barksdale, Henry C.; Greenman, David W.; Lang, Solomon Max; Hilton, George Stockbridge; Outlaw, Donald E.
1958-01-01
The maximum beneficial utilization of the ground-water resources cannot be accomplished in haphazard fashion. It must be planned and controlled on the basis of sound, current information about the hydrology of the various aquifers. Continued and, in some areas, intensified investigations of the ground-water resources of the region should form the basis for such planning and control.
Application of parallelized software architecture to an autonomous ground vehicle
NASA Astrophysics Data System (ADS)
Shakya, Rahul; Wright, Adam; Shin, Young Ho; Momin, Orko; Petkovsek, Steven; Wortman, Paul; Gautam, Prasanna; Norton, Adam
2011-01-01
This paper presents improvements made to Q, an autonomous ground vehicle designed to participate in the Intelligent Ground Vehicle Competition (IGVC). For the 2010 IGVC, Q was upgraded with a new parallelized software architecture and a new vision processor. Improvements were made to the power system reducing the number of batteries required for operation from six to one. In previous years, a single state machine was used to execute the bulk of processing activities including sensor interfacing, data processing, path planning, navigation algorithms and motor control. This inefficient approach led to poor software performance and made it difficult to maintain or modify. For IGVC 2010, the team implemented a modular parallel architecture using the National Instruments (NI) LabVIEW programming language. The new architecture divides all the necessary tasks - motor control, navigation, sensor data collection, etc. into well-organized components that execute in parallel, providing considerable flexibility and facilitating efficient use of processing power. Computer vision is used to detect white lines on the ground and determine their location relative to the robot. With the new vision processor and some optimization of the image processing algorithm used last year, two frames can be acquired and processed in 70ms. With all these improvements, Q placed 2nd in the autonomous challenge.
USGS California Water Science Center water programs in California
Shulters, Michael V.
2005-01-01
California is threatened by many natural hazards—fire, floods, landslides, earthquakes. The State is also threatened by longer-term problems, such as hydrologic effects of climate change, and human-induced problems, such as overuse of ground water and degradation of water quality. The threats and problems are intensified by increases in population, which has risen to nearly 36.8 million. For the USGS California Water Science Center, providing scientific information to help address hazards, threats, and hydrologic issues is a top priority. To meet the demands of a growing California, USGS scientific investigations are helping State and local governments improve emergency management, optimize resources, collect contaminant-source and -mobility information, and improve surface- and ground-water quality. USGS hydrologic studies and data collection throughout the State give water managers quantifiable and detailed scientific information that can be used to plan for development and to protect and more efficiently manage resources. The USGS, in cooperation with state, local, and tribal agencies, operates more than 500 instrument stations, which monitor streamflow, ground-water levels, and surface- and ground-water constituents to help protect water supplies and predict the threats of natural hazards. The following are some of the programs implemented by the USGS, in cooperation with other agencies, to obtain and analyze information needed to preserve California's environment and resources.
Reconfigurable Software for Controlling Formation Flying
NASA Technical Reports Server (NTRS)
Mueller, Joseph B.
2006-01-01
Software for a system to control the trajectories of multiple spacecraft flying in formation is being developed to reflect underlying concepts of (1) a decentralized approach to guidance and control and (2) reconfigurability of the control system, including reconfigurability of the software and of control laws. The software is organized as a modular network of software tasks. The computational load for both determining relative trajectories and planning maneuvers is shared equally among all spacecraft in a cluster. The flexibility and robustness of the software are apparent in the fact that tasks can be added, removed, or replaced during flight. In a computational simulation of a representative formation-flying scenario, it was demonstrated that the following are among the services performed by the software: Uploading of commands from a ground station and distribution of the commands among the spacecraft, Autonomous initiation and reconfiguration of formations, Autonomous formation of teams through negotiations among the spacecraft, Working out details of high-level commands (e.g., shapes and sizes of geometrically complex formations), Implementation of a distributed guidance law providing autonomous optimization and assignment of target states, and Implementation of a decentralized, fuel-optimal, impulsive control law for planning maneuvers.
Transformation reborn: A new generation expert system for planning HST operations
NASA Technical Reports Server (NTRS)
Gerb, Andrew
1991-01-01
The Transformation expert system (TRANS) converts proposals for astronomical observations with the Hubble Space Telescope (HST) into detailed observing plans. It encodes expert knowledge to solve problems faced in planning and commanding HST observations to enable their processing by the Science Operations Ground System (SOGS). Among these problems are determining an acceptable order of executing observations, grouping of observations to enhance efficiency and schedulability, inserting extra observations when necessary, and providing parameters for commanding HST instruments. TRANS is currently an operational system and plays a critical role in the HST ground system. It was originally designed using forward-chaining provided by the OPS5 expert system language, but has been reimplemented using a procedural knowledge base. This reimplementation was forced by the explosion in the amount of OPS5 code required to specify the increasingly complicated situations requiring expert-level intervention by the TRANS knowledge base. This problem was compounded by the difficulty of avoiding unintended interaction between rules. To support the TRANS knowledge base, XCL, a small but powerful extension to Commom Lisp was implemented. XCL allows a compact syntax for specifying assignments and references to object attributes. XCL also allows the capability to iterate over objects and perform keyed lookup. The reimplementation of TRANS has greatly diminished the effort needed to maintain and enhance it. As a result of this, its functions have been expanded to include warnings about observations that are difficult or impossible to schedule or command, providing data to aid SPIKE, an intelligent planning system used for HST long-term scheduling, and providing information to the Guide Star Selection System (GSSS) to aid in determination of the long range availability of guide stars.
Developing Your School Grounds: A Planning Primer.
ERIC Educational Resources Information Center
Clearing, 1998
1998-01-01
Describes the planning steps and other practical considerations to establish successful trails, outdoor classrooms, or other environmental education improvements on school grounds. Steps include determining needs and methods for promoting projects, resources, site assessment, property lines, safety, and maintenance. Possible projects described…
NASA Astrophysics Data System (ADS)
Christoudias, T.; Proestos, Y.; Lelieveld, J.
2014-05-01
We estimate the global risk from the release and atmospheric dispersion of radionuclides from nuclear power plant accidents using the EMAC atmospheric chemistry-general circulation model. We included all nuclear reactors that are currently operational, under construction and planned or proposed. We implemented constant continuous emissions from each location in the model and simulated atmospheric transport and removal via dry and wet deposition processes over 20 years (2010-2030), driven by boundary conditions based on the IPCC A2 future emissions scenario. We present global overall and seasonal risk maps for potential surface layer concentrations and ground deposition of radionuclides, and estimate potential doses to humans from inhalation and ground-deposition exposures to radionuclides. We find that the risk of harmful doses due to inhalation is typically highest in the Northern Hemisphere during boreal winter, due to relatively shallow boundary layer development and limited mixing. Based on the continued operation of the current nuclear power plants, we calculate that the risk of radioactive contamination to the citizens of the USA will remain to be highest worldwide, followed by India and France. By including stations under construction and those that are planned and proposed, our results suggest that the risk will become highest in China, followed by India and the USA.
NASA Astrophysics Data System (ADS)
Christoudias, T.; Proestos, Y.; Lelieveld, J.
2013-11-01
We estimate the global risk from the release and atmospheric dispersion of radionuclides from nuclear power plant accidents using the EMAC atmospheric chemistry-general circulation model. We included all nuclear reactors that are currently operational, under construction and planned or proposed. We implemented constant continuous emissions from each location in the model and simulated atmospheric transport and removal via dry and wet deposition processes over 20 yr (2010-2030), driven by boundary conditions based on the IPCC A2 future emissions scenario. We present global overall and seasonal risk maps for potential surface layer concentrations and ground deposition of radionuclides, and estimate potential dosages to humans from the inhalation and the exposure to ground deposited radionuclides. We find that the risk of harmful doses due to inhalation is typically highest during boreal winter due to relatively shallow boundary layer development and reduced mixing. Based on the continued operation of the current nuclear power plants, we calculate that the risk of radioactive contamination to the citizens of the USA will remain to be highest worldwide, followed by India and France. By including stations under construction and those that are planned and proposed our results suggest that the risk will become highest in China, followed by India and the USA.
NASA Astrophysics Data System (ADS)
Christoudias, T.; Proestos, Y.; Lelieveld, J.
2014-12-01
We estimate the global risk from the release and atmospheric dispersion of radionuclides from nuclear power plant accidents using the EMAC atmospheric chemistry-general circulation model. We included all nuclear reactors that are currently operational, under construction and planned or proposed. We implemented constant continuous emissions from each location in the model and simulated atmospheric transport and removal via dry and wet deposition processes over 20 years (2010-2030), driven by boundary conditions based on the IPCC A2 future emissions scenario. We present global overall and seasonal risk maps for potential surface layer concentrations and ground deposition of radionuclides, and estimate potential doses to humans from inhalation and ground-deposition exposures to radionuclides. We find that the risk of harmful doses due to inhalation is typically highest in the Northern Hemisphere during boreal winter, due to relatively shallow boundary layer development and limited mixing. Based on the continued operation of the current nuclear power plants, we calculate that the risk of radioactive contamination to the citizens of the USA will remain to be highest worldwide, followed by India and France. By including stations under construction and those that are planned and proposed, our results suggest that the risk will become highest in China, followed by India and the USA.
NASA Technical Reports Server (NTRS)
Griner, James H.; Jirberg, Russ; Frantz, Brian; Kachmar, Brian A.
2006-01-01
NASA s Aviation Safety Program was created for the purpose of making a significant reduction in the incidents of weather related aviation accidents by improving situational awareness. The objectives of that program are being met in part through advances in weather sensor technology, and in part through advances in the communications technology that are developed for use in the National Airspace System. It is this latter element, i.e., the improvements in aviation communication technologies, that is the focus of the Weather Information Communications project. This report describes the final flight test results completed under the WINCOMM project at the NASA Glenn Research Center of the 1090 Extended Squitter (1090ES) and VDL Mode 3 (VDL-3) data links as a medium for weather data exchange. It presents the use of 1090ES to meet the program objectives of sending broadcast turbulence information and the use of VDL-3 to send graphical weather images. This report provides the test requirements and test plans, which led to flight tests, as well as final results from flight testing. The reports define the changes made to both avionics and ground-based receivers as well as the ground infrastructure to support implementation of the recommended architecture, with a focus on the issues associated with these changes.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-02
... Promulgation of Air Quality Implementation Plans; District of Columbia; Regional Haze State Implementation Plan... of Columbia Regional Haze Plan, a revision to the District of Columbia State Implementation Plan (SIP... existing anthropogenic impairment of visibility in mandatory Class I areas through a regional haze program...
Martinez, Catalina; Bacigalupe, Gonzalo; Cortada, Josep M; Grandes, Gonzalo; Sanchez, Alvaro; Pombo, Haizea; Bully, Paola
2017-02-17
The impact of lifestyle on health is undeniable and effective healthy lifestyle promotion interventions do exist. However, this is not a fundamental part of routine primary care clinical practice. We describe factors that determine changes in performance of primary health care centers involved in piloting the health promotion innovation 'Prescribe Vida Saludable' (PVS) phase II. We engaged four primary health care centers of the Basque Healthcare Service in an action research project aimed at changing preventive health practices. Prescribe Healthy Life (PVS from the Spanish "Prescribe Vida Saludable) is focused on designing, planning, implementing and evaluating innovative programs to promote multiple healthy habits, feasible to be performed in routine primary health care conditions. After 2 years of piloting, centers were categorized as having high, medium, or low implementation effectiveness. We completed qualitative inductive and deductive analysis of five focus groups with the staff of the centers. Themes generated through consensual grounded qualitative analysis were compared between centers to identify the dimensions that explain the variation in actual implementation of PVS, and retrospectively organized and assessed against the Consolidated Framework for Implementation Research (CFIR). Of the 36 CFIR constructs, 11 were directly related to the level of implementation performance: intervention source, evidence strength and quality, adaptability, design quality and packaging, tension for change, learning climate, self-efficacy, planning, champions, executing, and reflecting and evaluating, with -organizational tracking added as a new sub-construct. Additionally, another seven constructs emerged in the participants' discourse but were not related to center performance: relative advantage, complexity, patients' needs and resources, external policy and incentives, structural characteristics, available resources, and formally appointed internal implementation leaders. Our findings indicate that the success of the implementation seems to be associated with the following components: the context, the implementation process, and the collaborative modelling. Identifying barriers and enablers is useful for designing implementation strategies for health promotion in primary health care centers that are essential for innovation success. An implementation model is proposed to highlight the relationships between the CFIR constructs in the context of health promotion in primary care.
Autonomous Satellite Command and Control through the World Wide Web: Phase 3
NASA Technical Reports Server (NTRS)
Cantwell, Brian; Twiggs, Robert
1998-01-01
NASA's New Millenium Program (NMP) has identified a variety of revolutionary technologies that will support orders of magnitude improvements in the capabilities of spacecraft missions. This program's Autonomy team has focused on science and engineering automation technologies. In doing so, it has established a clear development roadmap specifying the experiments and demonstrations required to mature these technologies. The primary developmental thrusts of this roadmap are in the areas of remote agents, PI/operator interface, planning/scheduling fault management, and smart execution architectures. Phases 1 and 2 of the ASSET Project (previously known as the WebSat project) have focused on establishing World Wide Web-based commanding and telemetry services as an advanced means of interfacing a spacecraft system with the PI and operators. Current automated capabilities include Web-based command submission, limited contact scheduling, command list generation and transfer to the ground station, spacecraft support for demonstrations experiments, data transfer from the ground station back to the ASSET system, data archiving, and Web-based telemetry distribution. Phase 2 was finished in December 1996. During January-December 1997 work was commenced on Phase 3 of the ASSET Project. Phase 3 is the subject of this report. This phase permitted SSDL and its project partners to expand the ASSET system in a variety of ways. These added capabilities included the advancement of ground station capabilities, the adaptation of spacecraft on-board software, and the expansion of capabilities of the ASSET management algorithms. Specific goals of Phase 3 were: (1) Extend Web-based goal-level commanding for both the payload PI and the spacecraft engineer; (2) Support prioritized handling of multiple PIs as well as associated payload experimenters; (3) Expand the number and types of experiments supported by the ASSET system and its associated spacecraft; (4) Implement more advanced resource management, modeling and fault management capabilities that integrate the space and ground segments of the space system hardware; (5) Implement a beacon monitoring test; (6) Implement an experimental blackboard controller for space system management; (7) Further define typical ground station developments required for Internet-based remote control and for full system automation of the PI-to-spacecraft link. Each of those goals is examined in the next section. Significant sections of this report were also published as a conference paper.
Frequency Reuse, Cell Separation, and Capacity Analysis of VHF Digital Link Mode 3 TDMA
NASA Technical Reports Server (NTRS)
Shamma, Mohammed A.; Nguyen, Thanh C.; Apaza, Rafael D.
2003-01-01
The most recent studies by the Federal Aviation Administration (FAA) and the aviation industry have indicated that it has become increasingly difficult to make new VHF frequency or channel assignments to meet the aviation needs for air-ground communications. FAA has planned for several aggressive improvement measures to the existing systems, but these measures would not meet the projected voice communications needs beyond 2009. FAA found that since 1974 there has been, on the average, a 4 percent annual increase in the number of channel assignments needed to satisfy the air-ground communication traffic (approximately 300 new channel assignments per year). With the planned improvement measures, the channel assignments are expected to reach a maximum number of 16615 channels by about 2010. Hence, the FAA proposed the use of VDL Mode 3 as a new integrated digital voice and data communications systems to meet the future air traffic demand. This paper presents analytical results of frequency reuse; cell separation and capacity estimation of VDL Mode 3 TDMA systems that FAA has planned to implement the future VHF air-ground communications system by the year 2010. For TDMA, it is well understood that the frequency reuse factor is a crucial parameter for capacity estimation. Formulation of this frequency reuse factor is shown, taking into account the limitation imposed by the requirement to have a sufficient Signal to Co-Channel Interference Ratio. Several different values for the Signal to Co-Channel Interference Ratio were utilized corresponding to the current analog VHF DSB-AM systems, and the future digital VDL Mode 3. The required separation of Co-Channel cells is computed for most of the Frequency Protected Service Volumes (FPSV's) currently in use by the FAA. Additionally, the ideal cell capacity for each FPSV is presented. Also, using actual traffic for the Detroit air space, a FPSV traffic distribution model is used to generate a typical cell for channel capacity prediction. Such prediction is useful for evaluating the improvement of future VDL Mode 3 deployment and capacity planning.
An introduction to implementation science for the non-specialist.
Bauer, Mark S; Damschroder, Laura; Hagedorn, Hildi; Smith, Jeffrey; Kilbourne, Amy M
2015-09-16
The movement of evidence-based practices (EBPs) into routine clinical usage is not spontaneous, but requires focused efforts. The field of implementation science has developed to facilitate the spread of EBPs, including both psychosocial and medical interventions for mental and physical health concerns. The authors aim to introduce implementation science principles to non-specialist investigators, administrators, and policymakers seeking to become familiar with this emerging field. This introduction is based on published literature and the authors' experience as researchers in the field, as well as extensive service as implementation science grant reviewers. Implementation science is "the scientific study of methods to promote the systematic uptake of research findings and other EBPs into routine practice, and, hence, to improve the quality and effectiveness of health services." Implementation science is distinct from, but shares characteristics with, both quality improvement and dissemination methods. Implementation studies can be either assess naturalistic variability or measure change in response to planned intervention. Implementation studies typically employ mixed quantitative-qualitative designs, identifying factors that impact uptake across multiple levels, including patient, provider, clinic, facility, organization, and often the broader community and policy environment. Accordingly, implementation science requires a solid grounding in theory and the involvement of trans-disciplinary research teams. The business case for implementation science is clear: As healthcare systems work under increasingly dynamic and resource-constrained conditions, evidence-based strategies are essential in order to ensure that research investments maximize healthcare value and improve public health. Implementation science plays a critical role in supporting these efforts.
2009-09-30
Node deployment. Original plans were to deploy directly to Fort Jefferson on Dry Tortugas (near Key West, FL). Current plans are to initially deploy...to the USCG Station on Ismoralda Key for training operations; then deploy at a to-be- determined date to Fort Jefferson on Dry Tortugas . During FY09...Dry Tortugas . NRL expects to deliver the Ground Node to Ismoralda Key in October 2009. FY09 continued the third year of providing Ground
LANDSAT-D ground segment operations plan, revision A
NASA Technical Reports Server (NTRS)
Evans, B.
1982-01-01
The basic concept for the utilization of LANDSAT ground processing resources is described. Only the steady state activities that support normal ground processing are addressed. This ground segment operations plan covers all processing of the multispectral scanner and the processing of thematic mapper through data acquisition and payload correction data generation for the LANDSAT 4 mission. The capabilities embedded in the hardware and software elements are presented from an operations viewpoint. The personnel assignments associated with each functional process and the mechanisms available for controlling the overall data flow are identified.
Centralized Alert-Processing and Asset Planning for Sensorwebs
NASA Technical Reports Server (NTRS)
Castano, Rebecca; Chien, Steve A.; Rabideau, Gregg R.; Tang, Benyang
2010-01-01
A software program provides a Sensorweb architecture for alert-processing, event detection, asset allocation and planning, and visualization. It automatically tasks and re-tasks various types of assets such as satellites and robotic vehicles in response to alerts (fire, weather) extracted from various data sources, including low-level Webcam data. JPL has adapted cons iderable Sensorweb infrastructure that had been previously applied to NASA Earth Science applications. This NASA Earth Science Sensorweb has been in operational use since 2003, and has proven reliability of the Sensorweb technologies for robust event detection and autonomous response using space and ground assets. Unique features of the software include flexibility to a range of detection and tasking methods including those that require aggregation of data over spatial and temporal ranges, generality of the response structure to represent and implement a range of response campaigns, and the ability to respond rapidly.
NASA Technical Reports Server (NTRS)
Williamson, Steve; Aman, Bob; Aurigema, Andrew; Melendez, Orlando
1999-01-01
The Wiltech Component Cleaning & Refurbishment Facility (WT-CCRF) at NASA Kennedy Space Center performs precision cleaning on approximately 200,000 metallic and non metallic components every year. WT-CCRF has developed a CFC elimination plan consisting of aqueous cleaning and verification and an economical dual solvent strategy for alternative solvent solution. Aqueous Verification Methodologies were implemented two years ago on a variety of Ground Support Equipment (GSE) components and sampling equipment. Today, 50% of the current workload is verified using aqueous methods and 90% of the total workload is degreased aqueously using, Zonyl and Brulin surfactants in ultrasonic baths. An additional estimated 20% solvent savings could be achieved if the proposed expanded use of aqueous methods are approved. Aqueous cleaning has shown to be effective, environmentally friendly and economical (i.e.. cost of materials, equipment, facilities and labor).
Development and pilot testing of a mental healthcare plan in Nepal
Jordans, M. J. D.; Luitel, N. P.; Pokhrel, P.; Patel, V.
2016-01-01
Background Mental health service delivery models that are grounded in the local context are needed to address the substantial treatment gap in low- and middle-income countries. Aims To present the development, and content, of a mental healthcare plan (MHCP) in Nepal and assess initial feasibility. Method A mixed methods formative study was conducted. Routine monitoring and evaluation data, including client flow and reports of satisfaction, were obtained from patients (n = 135) during the pilot-testing phase in two health facilities. Results The resulting MHCP consists of 12 packages, divided over community, health facility and organisation platforms. Service implementation data support the real-life applicability of the MHCP, with reasonable treatment uptake. Key barriers were identified and addressed, namely dissatisfaction with privacy, perceived burden among health workers and high drop-out rates. Conclusions The MHCP follows a collaborative care model encompassing community and primary healthcare interventions. PMID:26447173
JPL space robotics: Present accomplishments and future thrusts
NASA Astrophysics Data System (ADS)
Weisbin, C. R.; Hayati, S. A.; Rodriguez, G.
1994-10-01
Complex missions require routine and unscheduled inspection for safe operation. The purpose of research in this task is to facilitate structural inspection of the planned Space Station while mitigating the need for extravehicular activity (EVA), and giving the operator supervisory control over detailed and somewhat mundane, but important tasks. The telerobotic system enables inspection relative to a given reference (e.g., the status of the facility at the time of the last inspection) and alerts the operator to potential anomalies for verification and action. There are two primary objectives of this project: (1) To develop technologies that enable well-integrated NASA ground-to-orbit telerobotics operations, and (2) to develop a prototype common architecture workstation which implements these capabilities for other NASA technology projects and planned NASA flight applications. This task develops and supports three telerobot control modes which are applicable to time delay operation: Preview teleoperation, teleprogramming, and supervised autonomy.
Water resources of Soledad, Poway, and Moosa basins, San Diego County, California
Evenson, K.D.
1989-01-01
Reclaimed water is being considered as as supplemental water supply in the Soledad, Poway, and Moosa basins, San Diego County. This report describes the geology, soils, hydrology, and cultural factors in each of the basins as they relate to use of reclaimed water. Imported water is currently the major water-supply source in the basins. Groundwater supplies are used to a limited extent for both agricultural and domestic needs. Surface water flows are intermittent and, therefore, have not been developed for use in the basins. All three of the basins have the potential for use of reclaimed water, but only the Moosa basin is currently implementing a plan for such use. Concentrations of dissolved solids, chloride, and sulfate in both ground and surface water commonly exceed local basin objectives. As of 1985, plans for use of reclaimed water are oriented toward improving the quality of the groundwater. (USGS)
astroplan: An Open Source Observation Planning Package in Python
NASA Astrophysics Data System (ADS)
Morris, Brett M.; Tollerud, Erik; Sipőcz, Brigitta; Deil, Christoph; Douglas, Stephanie T.; Berlanga Medina, Jazmin; Vyhmeister, Karl; Smith, Toby R.; Littlefair, Stuart; Price-Whelan, Adrian M.; Gee, Wilfred T.; Jeschke, Eric
2018-03-01
We present astroplan—an open source, open development, Astropy affiliated package for ground-based observation planning and scheduling in Python. astroplan is designed to provide efficient access to common observational quantities such as celestial rise, set, and meridian transit times and simple transformations from sky coordinates to altitude-azimuth coordinates without requiring a detailed understanding of astropy’s implementation of coordinate systems. astroplan provides convenience functions to generate common observational plots such as airmass and parallactic angle as a function of time, along with basic sky (finder) charts. Users can determine whether or not a target is observable given a variety of observing constraints, such as airmass limits, time ranges, Moon illumination/separation ranges, and more. A selection of observation schedulers are included that divide observing time among a list of targets, given observing constraints on those targets. Contributions to the source code from the community are welcome.
JPL space robotics: Present accomplishments and future thrusts
NASA Technical Reports Server (NTRS)
Weisbin, C. R.; Hayati, S. A.; Rodriguez, G.
1994-01-01
Complex missions require routine and unscheduled inspection for safe operation. The purpose of research in this task is to facilitate structural inspection of the planned Space Station while mitigating the need for extravehicular activity (EVA), and giving the operator supervisory control over detailed and somewhat mundane, but important tasks. The telerobotic system enables inspection relative to a given reference (e.g., the status of the facility at the time of the last inspection) and alerts the operator to potential anomalies for verification and action. There are two primary objectives of this project: (1) To develop technologies that enable well-integrated NASA ground-to-orbit telerobotics operations, and (2) to develop a prototype common architecture workstation which implements these capabilities for other NASA technology projects and planned NASA flight applications. This task develops and supports three telerobot control modes which are applicable to time delay operation: Preview teleoperation, teleprogramming, and supervised autonomy.
Time management displays for shuttle countdown
NASA Technical Reports Server (NTRS)
Beller, Arthur E.; Hadaller, H. Greg; Ricci, Mark J.
1992-01-01
The Intelligent Launch Decision Support System project is developing a Time Management System (TMS) for the NASA Test Director (NTD) to use for time management during Shuttle terminal countdown. TMS is being developed in three phases: an information phase; a tool phase; and an advisor phase. The information phase is an integrated display (TMID) of firing room clocks, of graphic timelines with Ground Launch Sequencer events, and of constraints. The tool phase is a what-if spreadsheet (TMWI) for devising plans for resuming from unplanned hold situations. It is tied to information in TMID, propagates constraints forward and backward to complete unspecified values, and checks the plan against constraints. The advisor phase is a situation advisor (TMSA), which proactively suggests tactics. A concept prototype for TMSA is under development. The TMID is currently undergoing field testing. Displays for TMID and TMWI are described. Descriptions include organization, rationale for organization, implementation choices and constraints, and use by NTD.
NASA Technical Reports Server (NTRS)
Warmke, J. M.
1979-01-01
Modifications to Battelle's Interactive Graphics Orbit Selection (IGOS) computer program to assist in the planning and evaluation of the Seasat-A Scatterometer System (SASS) flight program were studied. To meet the planning needs of the LaRC Seasat-A Scatterometer team, the following features/modifications were implemented in IGOS: (1) display and specification of time increments in orbital passes represented by the cross-hatching of ground swaths; (2) addition of pass number annotations on the horizontal axis of the STPLNG and STPTOD plots; (3) modification of the sensor model to include more than two swaths associated with a single sensor to approximate the SASS cell pattern; (4) inclusion of down range and cross-track swath geometry to display the characteristic skewed SASS pattern; (5) addition of a swath schedule to allow the display of the SASS mode changes and to calibrate gaps; and (6) development of a set of commands to generate the detailed swath data from sensor characteristics and orbit/earth motion.
Development and pilot testing of a mental healthcare plan in Nepal.
Jordans, M J D; Luitel, N P; Pokhrel, P; Patel, V
2016-01-01
Mental health service delivery models that are grounded in the local context are needed to address the substantial treatment gap in low- and middle-income countries. To present the development, and content, of a mental healthcare plan (MHCP) in Nepal and assess initial feasibility. A mixed methods formative study was conducted. Routine monitoring and evaluation data, including client flow and reports of satisfaction, were obtained from patients (n = 135) during the pilot-testing phase in two health facilities. The resulting MHCP consists of 12 packages, divided over community, health facility and organisation platforms. Service implementation data support the real-life applicability of the MHCP, with reasonable treatment uptake. Key barriers were identified and addressed, namely dissatisfaction with privacy, perceived burden among health workers and high drop-out rates. The MHCP follows a collaborative care model encompassing community and primary healthcare interventions. © The Royal College of Psychiatrists 2016.
Butler, William H; Monroe, Ashley; McCaffrey, Sarah
2015-03-01
The Collaborative Forest Landscape Restoration Program (CFLRP), established in 2009, encourages collaborative landscape scale ecosystem restoration efforts on United States Forest Service (USFS) lands. Although the USFS employees have experience engaging in collaborative planning, CFLRP requires collaboration in implementation, a domain where little prior experience can be drawn on for guidance. The purpose of this research is to identify the ways in which CFLRP's collaborative participants and agency personnel conceptualize how stakeholders can contribute to implementation on landscape scale restoration projects, and to build theory on dynamics of collaborative implementation in environmental management. This research uses a grounded theory methodology to explore collaborative implementation from the perspectives and experiences of participants in landscapes selected as part of the CFLRP in 2010. Interviewees characterized collaborative implementation as encompassing three different types of activities: prioritization, enhancing treatments, and multiparty monitoring. The paper describes examples of activities in each of these categories and then identifies ways in which collaborative implementation in the context of CFLRP (1) is both hindered and enabled by overlapping legal mandates about agency collaboration, (2) creates opportunities for expanded accountability through informal and relational means, and, (3) creates feedback loops at multiple temporal and spatial scales through which monitoring information, prioritization, and implementation actions shape restoration work both within and across projects throughout the landscape creating more robust opportunities for adaptive management.
NASA Astrophysics Data System (ADS)
Butler, William H.; Monroe, Ashley; McCaffrey, Sarah
2015-03-01
The Collaborative Forest Landscape Restoration Program (CFLRP), established in 2009, encourages collaborative landscape scale ecosystem restoration efforts on United States Forest Service (USFS) lands. Although the USFS employees have experience engaging in collaborative planning, CFLRP requires collaboration in implementation, a domain where little prior experience can be drawn on for guidance. The purpose of this research is to identify the ways in which CFLRP's collaborative participants and agency personnel conceptualize how stakeholders can contribute to implementation on landscape scale restoration projects, and to build theory on dynamics of collaborative implementation in environmental management. This research uses a grounded theory methodology to explore collaborative implementation from the perspectives and experiences of participants in landscapes selected as part of the CFLRP in 2010. Interviewees characterized collaborative implementation as encompassing three different types of activities: prioritization, enhancing treatments, and multiparty monitoring. The paper describes examples of activities in each of these categories and then identifies ways in which collaborative implementation in the context of CFLRP (1) is both hindered and enabled by overlapping legal mandates about agency collaboration, (2) creates opportunities for expanded accountability through informal and relational means, and, (3) creates feedback loops at multiple temporal and spatial scales through which monitoring information, prioritization, and implementation actions shape restoration work both within and across projects throughout the landscape creating more robust opportunities for adaptive management.
14 CFR Appendix B to Part 415 - Safety Review Document Outline
Code of Federal Regulations, 2013 CFR
2013-01-01
....0Flight Safety (§ 415.115) 4.1Initial Flight Safety Analysis 4.1.1Flight Safety Sub-Analyses, Methods, and... Analysis Data 4.2Radionuclide Data (where applicable) 4.3Flight Safety Plan 4.3.1Flight Safety Personnel 4... Safety (§ 415.117) 5.1Ground Safety Analysis Report 5.2Ground Safety Plan 6.0Launch Plans (§ 415.119 and...
14 CFR Appendix B to Part 415 - Safety Review Document Outline
Code of Federal Regulations, 2014 CFR
2014-01-01
....0Flight Safety (§ 415.115) 4.1Initial Flight Safety Analysis 4.1.1Flight Safety Sub-Analyses, Methods, and... Analysis Data 4.2Radionuclide Data (where applicable) 4.3Flight Safety Plan 4.3.1Flight Safety Personnel 4... Safety (§ 415.117) 5.1Ground Safety Analysis Report 5.2Ground Safety Plan 6.0Launch Plans (§ 415.119 and...
Validation of Aura Data: Needs and Implementation
NASA Astrophysics Data System (ADS)
Froidevaux, L.; Douglass, A. R.; Schoeberl, M. R.; Hilsenrath, E.; Kinnison, D. E.; Kroon, M.; Sander, S. P.
2003-12-01
Validation of Aura data: needs and implementation L. Froidevaux, A. R. Douglass, M. R. Schoeberl, E. Hilsenrath, D. Kinnison, M. Kroon, and S. P. Sander We describe the needs for validation of the Aura scientific data products expected in 2004 and for several years thereafter, as well as the implementation plan to fullfill these needs. Many profiles of stratospheric and tropospheric composition are expected from the combination of four instruments aboard Aura, along with column abundances, aerosol and cloud information. The Aura validation working group and the Aura Project have been developing programs and collaborations that are expected to lead to a significant number of validation activities after the Aura launch (in early 2004). Spatial and temporal variability in the lower stratosphere and troposphere present challenges to validation of Aura measurements even where cloud contamination effects can be minimized. Data from ground-based networks, balloons, and other satellites will contribute in a major way to Aura data validation. In addition, plans are in place to obtain correlative data for special conditions, such as profiles of O3 and NO2 in polluted areas. Several aircraft campaigns planned for the 2004-2007 time period will provide additional tropospheric and lower stratospheric validation opportunities for Aura; some atmospheric science goals will be addressed by the eventual combination of these data sets. A team of "Aura liaisons" will assist in the dissemination of information about various correlative measurements to be expected in the above timeframe, along with any needed protocols and agreements on data exchange and file formats. A data center is being established at the Goddard Space Flight Center to collect and distribute the various data files to be used in the validation of the Aura data.
NASA Technical Reports Server (NTRS)
Scanlon, Charles H.
1988-01-01
The Automatic En Route Air Traffic Control (AERA) and the Advanced Automated System (AAS) of the NAS plan, call for utilization of data links for such items as computer generated flight clearances, enroute minimum safe altitude warnings, sector probes, out of conformance check, automated flight services, and flow management of advisories. A major technical challenge remaining is the integration, flight testing, and validation of data link equipment and procedures in the aircraft cockpit. The flight test organizational chart, was designed to have the airplane side of data link experiments implemented in the NASA Langley Research Center (LaRC) experimental Boeing 737 airplane. This design would enable investigations into implementation of data link equipment and pilot interface, operations, and procedures. The illustrated ground system consists of a work station with links to a national weather database and a data link transceiver system. The data link transceiver system could be a Mode-S transponder, ACARS, AVSAT, or another type of radio system such as the military type HF data link. The airborne system was designed so that a data link transceiver, workstation, and touch panel could be interfaced with an input output processor to the aircraft system bus and thus have communications access to other digital airplane systems.
NASA Astrophysics Data System (ADS)
Buongiorno, Maria Fabrizia; Musacchio, Massimo; Silvestri, Malvina; Spinetti, Claudia; Corradini, Stefano; Lombardo, Valerio; Merucci, Luca; Sansosti, Eugenio; Pugnagli, Sergio; Teggi, Sergio; Pace, Gaetano; Fermi, Marco; Zoffoli, Simona
2007-10-01
The Project called Sistema Rischio Vulcanico (SRV) is funded by the Italian Space Agency (ASI) in the frame of the National Space Plan 2003-2005 under the Earth Observations section for natural risks management. The SRV Project is coordinated by the Istituto Nazionale di Geofisica e Vulcanologia (INGV) which is responsible at national level for the volcanic monitoring. The objective of the project is to develop a pre-operative system based on EO data and ground measurements integration to support the volcanic risk monitoring of the Italian Civil Protection Department which requirements and need are well integrated in the GMES Emergency Core Services program. The project philosophy is to implement, by incremental versions, specific modules which allow to process, store and visualize through Web GIS tools EO derived parameters considering three activity phases: 1) knowledge and prevention; 2) crisis; 3) post crisis. In order to combine effectively the EO data and the ground networks measurements the system will implement a multi-parametric analysis tool, which represents and unique tool to analyze contemporaneously a large data set of data in "near real time". The SRV project will be tested his operational capabilities on three Italian Volcanoes: Etna,Vesuvio and Campi Flegrei.
24 CFR 598.605 - Implementation plan.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true Implementation plan. 598.605 Section 598.605 Housing and Urban Development Regulations Relating to Housing and Urban Development (Continued... Grants § 598.605 Implementation plan. (a) Implementation plan content. An EZ must submit an...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-13
... Promulgation of Air Quality Implementation Plans; Pennsylvania; Regional Haze State Implementation Plan AGENCY... the Regional Haze State Implementation Plan (SIP) (hereafter RH SIP) revision submitted by the... anthropogenic impairment of visibility in mandatory Class I areas [[Page 41280
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-09
... COUNCIL ON ENVIRONMENTAL QUALITY Instructions for Implementing Climate Change Adaptation Planning... Availability of Climate Change Adaptation Planning Implementing Instructions. SUMMARY: The Chair of the Council... for Implementing Climate Change Adaptation Planning are now available at: http://www.whitehouse.gov...
NASA Technical Reports Server (NTRS)
Johnson, Walter W.; Lachter, Joel B.; Battiste, Vernol; Lim, Veranika; Brandt, Summer L.; Koteskey, Robert W.; Dao, Arik-Quang V.; Ligda, Sarah V.; Wu, Shu-Chieh
2011-01-01
A primary feature of the Next Generation Air Transportation System (NextGen) is trajectory based operations (TBO). Under TBO, aircraft flight plans are known to computer systems on the ground that aid in scheduling and separation. The Future Air Navigation System (FANS) was developed to support TBO, but relatively few aircraft in the US are FANSequipped. Thus, any near-term implementation must provide TBO procedures for non-FANS aircraft. Previous research has explored controller clearances, but any implementation must also provide procedures for aircraft requests. The work presented here aims to surface issues surrounding TBO communication procedures for non-FANS aircraft and for aircraft requesting deviations around weather. Three types of communication were explored: Voice, FANS, and ACARS,(Aircraft Communications Addressing and Reporting System). ACARS and FANS are datacom systems that differ in that FANS allows uplinked flight plans to be loaded into the Flight Management System (FMS), while ACARS delivers flight plans as text that must be entered manually via the Control Display Unit (CDU). Sixteen pilots (eight two-person flight decks) and four controllers participated in 32 20-minute scenarios that required the flight decks to navigate through convective weather as they approached their top of descents (TODs). Findings: The rate of non-conformance was higher than anticipated, with aircraft off path more than 20% of the time. Controllers did not differentiate between the ACARS and FANS datacom, and were mixed in their preference for Voice vs. datacom (ACARS and FANS). Pilots uniformly preferred Voice to datacom, particularly ACARS. Much of their dislike appears to result from the slow response times in the datacom conditions. As a result, participants frequently resorted to voice communication. These results imply that, before implementing TBO in environments where pilots make weather deviation requests, further research is needed to develop communication procedures that integrate voice and datacom.
Implementing Distributed Operations: A Comparison of Two Deep Space Missions
NASA Technical Reports Server (NTRS)
Mishkin, Andrew; Larsen, Barbara
2006-01-01
Two very different deep space exploration missions--Mars Exploration Rover and Cassini--have made use of distributed operations for their science teams. In the case of MER, the distributed operations capability was implemented only after the prime mission was completed, as the rovers continued to operate well in excess of their expected mission lifetimes; Cassini, designed for a mission of more than ten years, had planned for distributed operations from its inception. The rapid command turnaround timeline of MER, as well as many of the operations features implemented to support it, have proven to be conducive to distributed operations. These features include: a single science team leader during the tactical operations timeline, highly integrated science and engineering teams, processes and file structures designed to permit multiple team members to work in parallel to deliver sequencing products, web-based spacecraft status and planning reports for team-wide access, and near-elimination of paper products from the operations process. Additionally, MER has benefited from the initial co-location of its entire operations team, and from having a single Principal Investigator, while Cassini operations have had to reconcile multiple science teams distributed from before launch. Cassini has faced greater challenges in implementing effective distributed operations. Because extensive early planning is required to capture science opportunities on its tour and because sequence development takes significantly longer than sequence execution, multiple teams are contributing to multiple sequences concurrently. The complexity of integrating inputs from multiple teams is exacerbated by spacecraft operability issues and resource contention among the teams, each of which has their own Principal Investigator. Finally, much of the technology that MER has exploited to facilitate distributed operations was not available when the Cassini ground system was designed, although later adoption of web-based and telecommunication tools has been critical to the success of Cassini operations.
Development and implementation of a watershed management plan forLlac la Biche, Alberta, Canada.
White, J; Logan, M; Rawles, M
2006-01-01
Lakeland County is experiencing increasing developmental pressures arising from the oil and gas boom at nearby Fort McMurray. There is increased industrial traffic passing through the county, and 600 new residential lots are proposed in 2005, almost double from 5 years ago. Deteriorating surface water quality has been a concern in the area due to an increase in development and agriculture, while excessive fish harvesting and winterkills have impacted commercial and recreational fisheries. Today, walleye and pike populations in the lake remain collapsed and restocking efforts have not been successful. Due to the lack of studies done on the watershed, the county is leading a multidisciplinary research study which includes a baseline water quality study, riparian health assessments, land use mapping and ground-truthing and projects with the local health authority. This research has been summarized in a comprehensive state of the watershed report, which will be used to complete a watershed management plan for the Lac la Biche watershed. Recommendations from the state of the watershed report and watershed management plan will also be incorporated into municipal planning documents and recommend changes to the Municipal Government Act itself.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sandoval, Leonard Frank
This Stormwater Pollution Prevention Plan (SWPPP) is applicable to operations at the Technical Area -60 (TA-60) Roads and Grounds Facility and Associated Sigma Mesa Staging Area off Eniwetok Drive, in Los Alamos County, New Mexico.
Balloon-borne three-meter telescope for far-infrared and submillimeter astronomy
NASA Technical Reports Server (NTRS)
Fazio, Giovanni G.; Hoffmann, William F.; Harper, Doyal A.
1988-01-01
The scientific objectives, engineering analysis and design, results of technology development, and focal-plane instrumentation for a two-meter balloon-borne telescope for far-infrared and submillimeter astronomy are presented. The unique capabilities of balloon-borne observations are discussed. A program summary emphasizes the development of the two-meter design. The relationship of the Large Deployable Reflector (LDR) is also discussed. Detailed treatment is given to scientific objectives, gondola design, the mirror development program, experiment accommodations, ground support equipment requirements, NSBF design drivers and payload support requirements, the implementation phase summary development plan, and a comparison of three-meter and two-meter gondola concepts.
The Everglades Depth Estimation Network (EDEN) for Support of Ecological and Biological Assessments
Telis, Pamela A.
2006-01-01
The Everglades Depth Estimation Network (EDEN) is an integrated network of real-time water-level monitoring, ground-elevation modeling, and water-surface modeling that provides scientists and managers with current (1999-present), online water-depth information for the entire freshwater portion of the Greater Everglades. Presented on a 400-square-meter grid spacing, EDEN offers a consistent and documented dataset that can be used by scientists and managers to (1) guide large-scale field operations, (2) integrate hydrologic and ecological responses, and (3) support biological and ecological assessments that measure ecosystem responses to the implementation of the Comprehensive Everglades Restoration Plan.
Innovative Test Operations to Support Orion and Future Human Rated Missions
NASA Technical Reports Server (NTRS)
Koenig, William J.; Garcia, Rafael; Harris, Richard F.; See, Michael J.; Van Lear, Benjamin S.; Dobson, Jill M.; Norris, Scott Douglas
2017-01-01
This paper describes how the Orion program is implementing new and innovative test approaches and strategies in an evolving development environment. The early flight test spacecraft are evolving in design maturity and complexity requiring significant changes in the ground test operations for each mission. The testing approach for EM-2 is planned to validate innovative Orion production acceptance testing methods to support human exploration missions in the future. Manufacturing and testing at Kennedy Space Center in the Neil Armstrong Operations and Checkout facility will provide a seamless transition directly to the launch site avoiding transportation and checkout of the spacecraft from other locations.
A hybrid modulation for the dissemination of weather data to aircraft
NASA Technical Reports Server (NTRS)
Akos, Dennis M.
1991-01-01
Ohio University is continuing to conduct research to improve its system for weather data dissemination to aircraft. The current experimental system transmit compressed weather radar reflectivity patterns from a ground based station to aircraft. Although an effective system, the limited frequency spectrum does not provide a channel for transmission. This introduces the idea of a hybrid modulation. The hybrid technique encodes weather data using phase modulation (PM) onto an existing aeronautical channel which employs amplitude modulation (AM) for voice signal transmission. Ideally, the two modulations are independent of one another. The planned implementation and basis of the system are the reviewed.
40 CFR 52.672 - Approval of plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Idaho § 52.672 Approval of plans. (a) Carbon Monoxide. (1) EPA approves as a revision to the Idaho State Implementation Plan, the Limited Maintenance Plan for.... [Reserved] (e) Particulate Matter. (1) EPA approves as a revision to the Idaho State Implementation Plan...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-22
...The EPA is taking final action to promulgate a Reservation- specific Federal Implementation Plan in order to regulate emissions from oil and natural gas production facilities located on the Fort Berthold Indian Reservation in North Dakota. The Federal Implementation Plan includes basic air quality regulations for the protection of communities in and adjacent to the Fort Berthold Indian Reservation. The Federal Implementation Plan requires owners and operators of oil and natural gas production facilities to reduce emissions of volatile organic compounds emanating from well completions, recompletions, and production and storage operations. This Federal Implementation Plan will be implemented by the EPA, or a delegated tribal authority, until replaced by a Tribal Implementation Plan. The EPA proposed a Reservation-specific Federal Implementation Plan concurrently with an interim final rule on August 15, 2012. This final Federal Implementation Plan replaces the interim final rule in all intents and purposes on the effective date of the final rule. The EPA is taking this action pursuant to the Clean Air Act (CAA).
International Space Station (ISS) Low Pressure Intramodule Quick Disconnect Failures
NASA Technical Reports Server (NTRS)
Lewis, John F.; Harris, Danny; Link, Dwight; Morrison, Russel
2004-01-01
A failure of an ISS intermodule Quick Disconnect (QD) during protoflight vibration testing of ISS regenerative Environmental Control and Life Support (ECLS) hardware led to the discovery of QD design, manufacturing, and test flaws which can yield the male QD susceptible to failure of the secondary housing seal and inadequate housing assembly locking mechanisms. Discovery of this failure had large implications when considering that currently there are 399 similar units on orbit and approximately 1100 units on the ground integrated into flight hardware. Discovery of the nature of the failure required testing and analysis and implementation of a recovery plan requiring part screening and review of element level and project hazard analysis to determine if secondary seals are required. Implementation also involves coordination with the Nodes and MPLM project offices, Regenerative ECLS Project, ISS Payloads, JAXA, ESA, and ISS Logistics and Maintenance.
NASA Technical Reports Server (NTRS)
Marshall, Albert C.; Lee, James H.; Mcculloch, William H.; Sawyer, J. Charles, Jr.; Bari, Robert A.; Cullingford, Hatice S.; Hardy, Alva C.; Niederauer, George F.; Remp, Kerry; Rice, John W.
1993-01-01
An interagency Nuclear Safety Working Group (NSPWG) was chartered to recommend nuclear safety policy, requirements, and guidelines for the Space Exploration Initiative (SEI) nuclear propulsion program. These recommendations, which are contained in this report, should facilitate the implementation of mission planning and conceptual design studies. The NSPWG has recommended a top-level policy to provide the guiding principles for the development and implementation of the SEI nuclear propulsion safety program. In addition, the NSPWG has reviewed safety issues for nuclear propulsion and recommended top-level safety requirements and guidelines to address these issues. These recommendations should be useful for the development of the program's top-level requirements for safety functions (referred to as Safety Functional Requirements). The safety requirements and guidelines address the following topics: reactor start-up, inadvertent criticality, radiological release and exposure, disposal, entry, safeguards, risk/reliability, operational safety, ground testing, and other considerations.
NASA Technical Reports Server (NTRS)
Yechout, T. R.; Braman, K. B.
1984-01-01
The development, implementation and flight test evaluation of a performance modeling technique which required a limited amount of quasisteady state flight test data to predict the overall one g performance characteristics of an aircraft. The concept definition phase of the program include development of: (1) the relationship for defining aerodynamic characteristics from quasi steady state maneuvers; (2) a simplified in flight thrust and airflow prediction technique; (3) a flight test maneuvering sequence which efficiently provided definition of baseline aerodynamic and engine characteristics including power effects on lift and drag; and (4) the algorithms necessary for cruise and flight trajectory predictions. Implementation of the concept include design of the overall flight test data flow, definition of instrumentation system and ground test requirements, development and verification of all applicable software and consolidation of the overall requirements in a flight test plan.
Watts, Kenneth R.
2008-01-01
The population of Delta County, Colorado, like that in much of the Western United States, is forecast to increase substantially in the next few decades. A substantial portion of the increased population likely will reside in rural subdivisions and use residential wells for domestic water supplies. In Colorado, a subdivision developer is required to submit a water-supply plan through the county for approval by the Colorado Division of Water Resources. If the water supply is to be provided by wells, the water-supply plan must include a water-supply report. The water-supply report demonstrates the availability, sustainability, and suitability of the water supply for the proposed subdivision. During 2006, the U.S. Geological Survey, in cooperation with Delta County, Colorado, began a study to develop criteria that the Delta County Land Use Department can use to evaluate water-supply reports for proposed subdivisions. A table was prepared that lists the types of analyses and data that may be needed in a water-supply report for a water-supply plan that proposes the use of ground water. A preliminary analysis of the availability, sustainability, and suitability of the ground-water resources of Rogers Mesa, Delta County, Colorado, was prepared for a hypothetical subdivision to demonstrate hydrologic analyses and data that may be needed for water-supply reports for proposed subdivisions. Rogers Mesa is a 12-square-mile upland mesa located along the north side of the North Fork Gunnison River about 15 miles east of Delta, Colorado. The principal land use on Rogers Mesa is irrigated agriculture, with about 5,651 acres of irrigated cropland, grass pasture, and orchards. The principal source of irrigation water is surface water diverted from the North Fork Gunnison River and Leroux Creek. The estimated area of platted subdivisions on or partially on Rogers Mesa in 2007 was about 4,792 acres of which about 2,756 acres was irrigated land in 2000. The principal aquifer on Rogers Mesa consists of alluvial-fan deposits that overlie shale and, locally, sandstone. Maps of the base of the aquifer, the water table, and the saturated thickness of the aquifer were prepared from data from the well files of the Colorado Division of Water Resources. The base of the aquifer generally is topographically higher than the valleys of the North Fork Gunnison River and Leroux Creek, and direct hydraulic connection of the aquifer to North Fork Gunnison River and Leroux Creek is limited. The aquifer is recharged primarily by infiltration of surface water diverted for irrigation. Ground water discharges to seeps and springs and through slope deposits at the boundaries of the aquifer. Data from the well files also were used to estimate the specific capacity of wells and to estimate the transmissivity and hydraulic conductivity of the aquifer. A water budget was used to estimate recharge to and discharge from the aquifer. Although storage within the aquifer likely varies seasonally and from year to year, it was assumed that there were no long-term changes in ground-water storage. Estimated average annual recharge to and discharge from the aquifer during November 1998 through October 2006 were about 30,767 acre-feet per year. Although sufficient ground water is available on Rogers Mesa for additional domestic water supplies, conversion of irrigated land to residential land use likely would reduce recharge to the aquifer, affecting the sustainability of ground-water supplies on Rogers Mesa. Stream-depletion analyses indicate that the ground water in the aquifer likely would be considered tributary ground water and additional uses of ground water to supply new subdivisions likely would require implementation of augmentation plans. Although sufficient ground water is available on Rogers Mesa for additional domestic water supplies, conversion of irrigated land to residential land use likely would reduce recharge to the aquifer, affecting the sustainability
24 CFR 598.605 - Implementation plan.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 3 2012-04-01 2012-04-01 false Implementation plan. 598.605 Section 598.605 Housing and Urban Development Regulations Relating to Housing and Urban Development... Empowerment Zone Grants § 598.605 Implementation plan. (a) Implementation plan content. An EZ must submit an...
24 CFR 598.605 - Implementation plan.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 3 2013-04-01 2013-04-01 false Implementation plan. 598.605 Section 598.605 Housing and Urban Development Regulations Relating to Housing and Urban Development... Empowerment Zone Grants § 598.605 Implementation plan. (a) Implementation plan content. An EZ must submit an...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-13
... this Federal Register, EPA is approving the State's implementation plan revision as a direct final rule...] Approval and Promulgation of Implementation Plans; Mississippi; Transportation Conformity SIP--Memorandum... proposing to approve a State Implementation Plan revision submitted by the Mississippi Department of...
Effective protection of open space: does planning matter?
Steelman, Toddi A; Hess, George R
2009-07-01
High quality plans are considered a crucial part of good land use planning and often used as a proxy measure for success in plan implementation and goal attainment. We explored the relationship of open space plan quality to the implementation of open space plans and attainment of open space protection goals in Research Triangle, North Carolina, USA. To measure plan quality, we used a standard plan evaluation matrix that we modified to focus on open space plans. We evaluated all open space plans in the region that contained a natural resource protection element. To measure plan implementation and open space protection, we developed an online survey and administered it to open space planners charged with implementing the plans. The survey elicited each planner's perspective on aspects of open space protection in his or her organization. The empirical results (1) indicate that success in implementation and attaining goals are not related to plan quality, (2) highlight the importance of when and how stakeholders are involved in planning and implementation processes, and (3) raise questions about the relationship of planning to implementation. These results suggest that a technically excellent plan does not guarantee the long-term relationships among local land owners, political and appointed officials, and other organizations that are crucial to meeting land protection goals. A greater balance of attention to the entire decision process and building relationships might lead to more success in protecting open space.
NASA Technical Reports Server (NTRS)
Lee, Paul U.; Bender, Kim; Pagan, Danielle
2011-01-01
Flexible Airspace Management (FAM) is a mid- term Next Generation Air Transportation System (NextGen) concept that allows dynamic changes to airspace configurations to meet the changes in the traffic demand. A series of human-in-the-loop (HITL) studies have identified procedures and decision support requirements needed to implement FAM. This paper outlines a suggested FAM procedure and associated decision support functionality based on these HITL studies. A description of both the tools used to support the HITLs and the planned NextGen technologies available in the mid-term are presented and compared. The mid-term implementation of several NextGen capabilities, specifically, upgrades to the Traffic Management Unit (TMU), the initial release of an en route automation system, the deployment of a digital data communication system, a more flexible voice communications network, and the introduction of a tool envisioned to manage and coordinate networked ground systems can support the implementation of the FAM concept. Because of the variability in the overall deployment schedule of the mid-term NextGen capabilities, the dependency of the individual NextGen capabilities are examined to determine their impact on a mid-term implementation of FAM. A cursory review of the different technologies suggests that new functionality slated for the new en route automation system is a critical enabling technology for FAM, as well as the functionality to manage and coordinate networked ground systems. Upgrades to the TMU are less critical but important nonetheless for FAM to be fully realized. Flexible voice communications network and digital data communication system could allow more flexible FAM operations but they are not as essential.
A scientific operations plan for the large space telescope. [ground support system design
NASA Technical Reports Server (NTRS)
West, D. K.
1977-01-01
The paper describes an LST ground system which is compatible with the operational requirements of the LST. The goal of the approach is to minimize the cost of post launch operations without seriously compromising the quality and total throughput of LST science. Attention is given to cost constraints and guidelines, the telemetry operations processing systems (TELOPS), the image processing facility, ground system planning and data flow, and scientific interfaces.
From safe yield to sustainable development of water resources - The Kansas experience
Sophocleous, M.
2000-01-01
This paper presents a synthesis of water sustainability issues from the hydrologic perspective. It shows that safe yield is a flawed concept and that sustainability is an idea that is broadly used but perhaps not well understood. In general, the sustainable yield of an aquifer must be considerably less than recharge if adequate amounts of water are to be available to sustain both the quantity and quality of streams, springs, wetlands, and ground-water-dependent ecosystems. To ensure sustainability, it is imperative that water limits be established based on hydrologic principles of mass balance. To establish water-use policies and planning horizons, the transition curves of aquifer systems from ground-water storage depletion to induced recharge of surface water need to be developed. Present-day numerical models are capable of generating such transition curves. Several idealized examples of aquifer systems show how this could be done. Because of the complexity of natural systems and the uncertainties in characterizing them, the current philosophy underlying sustainable management of water resources is based on the interconnected systems approach and on adaptive management. Examples of water-resources management from Kansas illustrate some of these concepts in a real-world setting. Some of the hallmarks of Kansas water management are the formation of local ground-water management districts, the adoption of minimum streamflow standards, the use of modified safe-yield policies in some districts, the implementation of integrated resource planning by the City of Wichita, and the subbasin water-resources management program in potential problem areas. These are all appropriate steps toward sustainable development. The Kansas examples show that local decision-making is the best way to fully account for local variability in water management. However, it is imperative that public education and involvement be encouraged, so that system complexities and constraints are better understood and overly simplistic solutions avoided. (C) 2000 Elsevier Science B.V.This paper presents a synthesis of water sustainability issues from the hydrologic perspective. It shows that safe yield is a flawed concept and that sustainability is an idea that is broadly used but perhaps not well understood. In general, the sustainable yield of an aquifer must be considerably less than recharge if adequate amounts of water are to be available to sustain both the quantity and quality of streams, springs, wetlands, and ground-water-dependent ecosystems. To ensure sustainability, it is imperative that water limits be established based on hydrologic principles of mass balance. To establish water-use policies and planning horizons, the transition curves of aquifer systems from ground-water storage depletion to induced recharge of surface water need to be developed. Present-day numerical models are capable of generating such transition curves. Several idealized examples of aquifer systems show how this could be done. Because of the complexity of natural systems and the uncertainties in characterizing them, the current philosophy underlying sustainable management of water resources is based on the interconnected systems approach and on adaptive management. Examples of water-resources management from Kansas illustrate some of these concepts in a real-world setting. Some of the hallmarks of Kansas water management are the formation of local ground-water management districts, the adoption of minimum streamflow standards, the use of modified safe-yield policies in some districts, the implementation of integrated resource planning by the City of Wichita, and the subbasin water-resources management program in potential problem areas. These are all appropriate steps toward sustainable development. The Kansas examples show that local decision-making is the best way to fully account for local variability in water management. However, it is imperative that public education and involv
Ground-water models for water resource planning
Moore, J.E.
1983-01-01
In the past decade hydrogeologists have emphasized the development of computer-based mathematical models to aid in the understanding of flow, the transport of solutes, transport of heat, and deformation in the ground-water system. These models have been used to provide information and predictions for water managers. Too frequently, ground-water was neglected in water resource planning because managers believed that it could not be adequately evaluated in terms of availability, quality, and effect of development on surface-water supplies. Now, however, with newly developed digital ground-water models, effects of development can be predicted. Such models have been used to predict hydrologic and quality changes under different stresses. These models have grown in complexity over the last ten years from simple one-layer models to three-dimensional simulations of ground-water flow, which may include solute transport, heat transport, effects of land subsidence, and encroachment of saltwater. Case histories illustrate how predictive ground-water models have provided the information needed for the sound planning and management of water resources in the USA. ?? 1983 D. Reidel Publishing Company.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-11
... Federal Implementation Plan for Implementing Best Available Retrofit Technology for Four Corners Power... Implementation Plan (FIP) to implement the Best Available Retrofit Technology (BART) requirement of the Regional... given the uncertainties in the electrical market in Arizona, EPA is proposing to extend the date by...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-08
..., Disapproval and Promulgation of Implementation Plans; State of Wyoming; Regional Haze State Implementation Plan; Federal Implementation Plan for Regional Haze; Notice of Public Hearings AGENCY: Environmental...) addressing regional haze under. We are making this change in response to letters submitted by the Governor of...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-26
... Federal Register, EPA is approving the State's implementation plan revision as a direct final rule without...] Approval and Promulgation of Implementation Plans; North Carolina; Transportation Conformity Memorandum of... Implementation Plan submitted on July 12, 2013, through the North Carolina Department of Environment and Natural...
77 FR 58072 - Finding of Substantial Inadequacy of Implementation Plan; Call for California State...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-19
... Substantial Inadequacy of Implementation Plan; Call for California State Implementation Plan Revision; South Coast AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: In response to a... that the California State Implementation Plan (SIP) for the Los Angeles-South Coast Air Basin (South...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-23
... Promulgation of Air Quality Implementation Plans; Illinois; Air Quality Standards Revision AGENCY... Illinois state implementation plan (SIP) to reflect current National Ambient Air Quality Standards (NAAQS... Implementation Plan at 35 Illinois Administrative Code part 243, which updates National Ambient Air Quality...
Private Pilot Ground School Course. Instructor's Guide.
ERIC Educational Resources Information Center
Schlenker, Richard M.
This manual consists of 10 lesson plans for use by instructors teaching a private pilot ground school course. Addressed in the individual lesson plans are the following topics: aerodynamics and principles of flight, flight instruments and systems, operational publications, regulations, airplane operations, engine operations, radio communications,…
NASA Astrophysics Data System (ADS)
Howell, Kerry-Louise; Piechaud, Nils; Downie, Anna-Leena; Kenny, Andrew
2016-09-01
Sponge aggregations have been recognised as key component of shallow benthic ecosystems providing several important functional roles including habitat building and nutrient recycling. Within the deep-sea ecosystem, sponge aggregations may be extensive and available evidence suggests they may also play important functional roles, however data on their ecology, extent and distribution in the North Atlantic is lacking, hampering conservation efforts. In this study, we used Maximum Entropy Modelling and presence data for two deep-sea sponge aggregation types, Pheronema carpenteri aggregations and ostur aggregations dominated by geodid sponges, to address the following questions: 1) What environmental factors drive the broad-scale distribution of these selected sponge grounds? 2) What is the predicted distribution of these grounds in the northern North Atlantic, Norwegian and Barents Sea? 3) How are these sponge grounds distributed between Exclusive Economic Zones (EEZs) and High Seas areas? 4) What percentage of these grounds in High Seas areas are protected by the current High Seas MPA network? Our results suggest that silicate concentration, temperature, depth and amount of particulate organic carbon are the most important drivers of sponge distribution. Most of the sponge grounds are located within national EEZs rather than in the High Seas. Coordinated conservation planning between nations with significant areas of sponge grounds such as Iceland, Greenland and Faroes (Denmark), Norway (coastal Norway and Svalbard), Portugal and the UK, should be implemented in order to effectively manage these communities in view of the increasing level of human activity within the deep-sea environment.
2015-01-01
Ground control research in underground coal mines has been ongoing for over 50 years. One of the most problematic issues in underground coal mines is roof failures associated with weak shale. This paper will present a historical narrative on the research the National Institute for Occupational Safety and Health has conducted in relation to rock mechanics and shale. This paper begins by first discussing how shale is classified in relation to coal mining. Characterizing and planning for weak roof sequences is an important step in developing an engineering solution to prevent roof failures. Next, the failure mechanics associated with the weak characteristics of shale will be discussed. Understanding these failure mechanics also aids in applying the correct engineering solutions. The various solutions that have been implemented in the underground coal mining industry to control the different modes of failure will be summarized. Finally, a discussion on current and future research relating to rock mechanics and shale is presented. The overall goal of the paper is to share the collective ground control experience of controlling roof structures dominated by shale rock in underground coal mining. PMID:26549926
Murphy, M M
2016-02-01
Ground control research in underground coal mines has been ongoing for over 50 years. One of the most problematic issues in underground coal mines is roof failures associated with weak shale. This paper will present a historical narrative on the research the National Institute for Occupational Safety and Health has conducted in relation to rock mechanics and shale. This paper begins by first discussing how shale is classified in relation to coal mining. Characterizing and planning for weak roof sequences is an important step in developing an engineering solution to prevent roof failures. Next, the failure mechanics associated with the weak characteristics of shale will be discussed. Understanding these failure mechanics also aids in applying the correct engineering solutions. The various solutions that have been implemented in the underground coal mining industry to control the different modes of failure will be summarized. Finally, a discussion on current and future research relating to rock mechanics and shale is presented. The overall goal of the paper is to share the collective ground control experience of controlling roof structures dominated by shale rock in underground coal mining.
NASA Astrophysics Data System (ADS)
Murphy, M. M.
2016-02-01
Ground control research in underground coal mines has been ongoing for over 50 years. One of the most problematic issues in underground coal mines is roof failures associated with weak shale. This paper will present a historical narrative on the research the National Institute for Occupational Safety and Health has conducted in relation to rock mechanics and shale. This paper begins by first discussing how shale is classified in relation to coal mining. Characterizing and planning for weak roof sequences is an important step in developing an engineering solution to prevent roof failures. Next, the failure mechanics associated with the weak characteristics of shale will be discussed. Understanding these failure mechanics also aids in applying the correct engineering solutions. The various solutions that have been implemented in the underground coal mining industry to control the different modes of failure will be summarized. Finally, a discussion on current and future research relating to rock mechanics and shale is presented. The overall goal of the paper is to share the collective ground control experience of controlling roof structures dominated by shale rock in underground coal mining.
Louisiana's 2017 Master Plan for a Sustainable Coast
NASA Astrophysics Data System (ADS)
Haase, B.
2017-12-01
The Coastal Protection and Restoration Authority is charged with coordinating restoration and protection investments through the development and implementation of Louisiana's Comprehensive Master Plan for a Sustainable Coast. The first master plan was submitted to the Louisiana Legislature in 2007 and is mandated to be updated every five years. The plan's objectives are to reduce economic losses from flooding, promote sustainability by harnessing natural processes, provide habitats for commercial and recreational activities, sustain cultural heritage and promote a viable working coast. Two goals drive decision making about the appropriate suite of restoration and protection projects to include in the Plan: restore and maintain Louisiana's wetlands and provide flood protection for coastal Louisiana's citizens. As part of the decision making process, a wide range of additional metrics are used to evaluate the complex, competing needs of communities, industries, navigation and fisheries. The master plan decision making process includes the identification of individual protection and restoration projects that are evaluated with landscape, storm surge, and risk assessment models and then ranked by how well they perform over time across the set of decision drivers and metrics. High performing projects are assembled into alternatives constrained by available funding and river resources. The planning process is grounded not only on extensive scientific analysis but also on interdisciplinary collaboration between scientists, engineers, planners, community advocates, and coastal stakeholders which creates the long-term dialogue needed for complex environmental planning decisions. It is through this collaboration that recommended alternatives are reviewed and modified to develop the final Plan. Keywords:alternative formulation, comprehensive planning, ecosystem restoration, flood risk reduction and stakeholder engagement
NASA Astrophysics Data System (ADS)
Nathan Harris, E.; Morgenthaler, George W.
2004-07-01
Beginning in 1995, a team of 3-D engineering visualization experts assembled at the Lockheed Martin Space Systems Company and began to develop innovative virtual prototyping simulation tools for performing ground processing and real-time visualization of design and planning of aerospace missions. At the University of Colorado, a team of 3-D visualization experts also began developing the science of 3-D visualization and immersive visualization at the newly founded British Petroleum (BP) Center for visualization, which began operations in October, 2001. BP acquired ARCO in the year 2000 and awarded the 3-D flexible IVE developed by ARCO (beginning in 1990) to the University of Colorado, CU, the winner in a competition among 6 Universities. CU then hired Dr. G. Dorn, the leader of the ARCO team as Center Director, and the other experts to apply 3-D immersive visualization to aerospace and to other University Research fields, while continuing research on surface interpretation of seismic data and 3-D volumes. This paper recounts further progress and outlines plans in Aerospace applications at Lockheed Martin and CU.
Can hospital relocations and closures be stopped through the legal system?
Rose, M G
1983-01-01
The recent history of litigation to stop hospital closings in or relocations from minority communities is reviewed. Legal arguments and facts raised by plaintiffs and defendants in seven cases are summarized in the context of civil rights and health planning legislation. The results of the litigation are mixed. One hospital was denied permission to close, but this was decided principally on procedural grounds. A planning agency's recommendation against closing another hospital may prove difficult to implement for financial reasons. Several cases have resulted in modifications of relocation plans and have established guarantees of certain rights to plaintiffs. These, however, may be difficult to enforce if hospitals lack the desire or resources to sustain needed levels of service. Generally, the courts have been reluctant to undertake socioeconomic decision making. They have tended to excuse relocations with racially discriminatory impacts when it has been argued that the relocations were necessary for hospital financial survival, and they have been unwilling to test the credibility of those arguments. Legal avenues to contesting with success the closing of most hospitals also appear to be blocked by similar untested contentions. PMID:6199325
Laser Interferometry for Gravitational Wave Observation: LISA and LISA Pathfinder
NASA Technical Reports Server (NTRS)
Guzman, Felipe
2010-01-01
The Laser Interferometer Space Antenna (LISA) is a planned NASA-ESA gravitational wave observatory in the frequency range of 0.1mHz-100mHz. This observation band is inaccessible to ground-based detectors due to the large ground motions of the Earth. Gravitational wave sources for LISA include galactic binaries, mergers of supermasive black-hole binaries, extreme-mass-ratio inspirals, and possibly from as yet unimagined sources. LISA is a constellation of three spacecraft separated by 5 million km in an equilateral triangle, whose center follows the Earth in a heliocentric orbit with an orbital phase offset oF 20 degrees. Challenging technology is required to ensure pure geodetic trajectories of the six onboard test masses, whose distance fluctuations will be measured by interspacecraft laser interferometers with picometer accuracy. LISA Pathfinder is an ESA-launched technology demonstration mission of key LISA subsystems such us spacecraft control with micro-newton thrusters, test mass drag-free control, and precision laser interferometry between free-flying test masses. Ground testing of flight hardware of the Gravitational Reference Sensor and Optical Metrology subsystems of LISA Pathfinder is currently ongoing. An introduction to laser interferometric gravitational wave detection, ground-based observatories, and a detailed description of the two missions together with an overview of current investigations conducted by the community will bc discussed. The current status in development and implementation of LISA Pathfinder pre-flight systems and latest results of the ongoing ground testing efforts will also be presented
Summary appraisals of the Nation's ground-water resources; Missouri Basin region
Taylor, O. James
1978-01-01
Comprehensive water-management planning in the Missouri Basin Region will require periodic or continuing inventory of precipitation, streamflow, surface-water storage, and ground water. Water demands for irrigation, industrial, public supply, and rural use are increasing rapidly. Reliance on ground-water supplies is increasing even though in many areas the ground water is still mostly undeveloped. Optimal use of water supplies will require the establishment of realistic goals and carefully conceived water-management plans, each of which will necessarily be based on an adequate baseline of hydrologic data and knowledge of the highly variable hydrologic systems in the region.
Evolution and Reengineering of NASA's Flight Dynamics Facility (FDF)
NASA Technical Reports Server (NTRS)
Stengle, Thomas; Hoge, Susan
2008-01-01
The NASA Goddard Space Flight Center's Flight Dynamics Facility (FDF) is a multimission support facility that performs ground navigation and spacecraft trajectory design services for a wide range of scientific satellites. The FDF also supports the NASA Space Network by providing orbit determination and tracking data evaluation services for the Tracking Data Relay Satellite System (TDRSS). The FDF traces its history to early NASA missions in the 1960's, including navigation support to the Apollo lunar missions. Over its 40 year history, the FDF has undergone many changes in its architecture, services offered, missions supported, management approach, and business operation. As a fully reimbursable facility (users now pay 100% of all costs for FDF operations and sustaining engineering activities), the FDF has faced significant challenges in recent years in providing mission critical products and services at minimal cost while defining and implementing upgrades necessary to meet future mission demands. This paper traces the history of the FDF and discusses significant events in the past that impacted the FDF infrastructure and/or business model, and the events today that are shaping the plans for the FDF in the next decade. Today's drivers for change include new mission requirements, the availability of new technology for spacecraft navigation, and continued pressures for cost reduction from FDF users. Recently, the FDF completed an architecture study based on these drivers that defines significant changes planned for the facility. This paper discusses the results of this study and a proposed implementation plan. As a case study in how flight dynamics operations have evolved and will continue to evolve, this paper focuses on two periods of time (1992 and the present) in order to contrast the dramatic changes that have taken place in the FDF. This paper offers observations and plans for the evolution of the FDF over the next ten years. Finally, this paper defines the mission model of the future for the FDF based on NASA's current mission list and planning for the Constellation Program. As part of this discussion the following are addressed: the relevance and benefits of a multi-mission facility for NASA's navigation operations in the future; anticipated technologies affecting ground orbit determination; continued incorporation of Commercial Off-the-shelf (COTS) software into the FDF; challenges of a business model that relies entirely on user fees to fund facility upgrades; anticipated changes in flight dynamics services required; and considerations for defining architecture upgrades given a set of cost drivers.
Onboard Short Term Plan Viewer
NASA Technical Reports Server (NTRS)
Hall, Tim; LeBlanc, Troy; Ulman, Brian; McDonald, Aaron; Gramm, Paul; Chang, Li-Min; Keerthi, Suman; Kivlovitz, Dov; Hadlock, Jason
2011-01-01
Onboard Short Term Plan Viewer (OSTPV) is a computer program for electronic display of mission plans and timelines, both aboard the International Space Station (ISS) and in ISS ground control stations located in several countries. OSTPV was specifically designed both (1) for use within the limited ISS computing environment and (2) to be compatible with computers used in ground control stations. OSTPV supplants a prior system in which, aboard the ISS, timelines were printed on paper and incorporated into files that also contained other paper documents. Hence, the introduction of OSTPV has both reduced the consumption of resources and saved time in updating plans and timelines. OSTPV accepts, as input, the mission timeline output of a legacy, print-oriented, UNIX-based program called "Consolidated Planning System" and converts the timeline information for display in an interactive, dynamic, Windows Web-based graphical user interface that is used by both the ISS crew and ground control teams in real time. OSTPV enables the ISS crew to electronically indicate execution of timeline steps, launch electronic procedures, and efficiently report to ground control teams on the statuses of ISS activities, all by use of laptop computers aboard the ISS.
Setting analyst: A practical harvest planning technique
Olivier R.M. Halleux; W. Dale Greene
2001-01-01
Setting Analyst is an ArcView extension that facilitates practical harvest planning for ground-based systems. By modeling the travel patterns of ground-based machines, it compares different harvesting settings based on projected average skidding distance, logging costs, and site disturbance levels. Setting Analyst uses information commonly available to consulting...
6. 1859 sketch of the hospital's ground floor plan, before ...
6. 1859 sketch of the hospital's ground floor plan, before construction commenced in 1860. Photocopied from Report of the Board of Managers of the Hospital of the Protestant Episcopal Church, 1859 - Hospital of Protestant Episcopal Church in Philadelphia, Front Street & Lehigh Avenue, Philadelphia, Philadelphia County, PA
Shklarov, Svetlana; Marshall, Deborah A; Wasylak, Tracy; Marlett, Nancy J
2017-12-01
A patient research internship (Patient and Community Engagement Research program-PaCER) was created to support a provincial commitment by Alberta Health Services' Strategic Clinical Networks ™ to find new ways to engage patients in a new interdisciplinary organization to support evidence-informed improvements in clinical outcomes across the health system. Implement and test a new research method and training curriculum to build patient capacity for engagement in health through peer-to-peer research. Programme evaluation using Outcome Mapping and the grounded theory method. Twenty-one patients with various chronic conditions completed one year of training in adapted qualitative research methods, including an internship where they designed and conducted five peer-to-peer inquiries into a range of health experiences. Outcomes were continually monitored and evaluated using an Outcome Mapping framework, in combination with grounded theory analysis, based on data from focus groups, observation, documentation review and semi-structured interviews (21 patient researchers, 15 professional collaborators). Key stakeholders indicated the increased capacity of patients to engage in health-care research and planning, and the introduction and acceptance of new, collaborative roles for patients in health research. The uptake of new patient roles in health-care planning began to impact attitudes and practices. Patient researchers become "part of the team" through cultural and relationship changes that occur in two convergent directions: (i) building the capacity of patients to engage confidently in a dialogue with clinicians and decision makers, and (ii) increasing the readiness for patient engagement uptake within targeted organizations. © 2017 The Authors Health Expectations Published by John Wiley & Sons Ltd.
40 CFR 52.1392 - Federal Implementation Plan for the Billings/Laurel Area.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 4 2013-07-01 2013-07-01 false Federal Implementation Plan for the Billings/Laurel Area. 52.1392 Section 52.1392 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Montana § 52.1392 Federal Implementation Plan for...
40 CFR 52.1392 - Federal Implementation Plan for the Billings/Laurel Area.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 4 2012-07-01 2012-07-01 false Federal Implementation Plan for the Billings/Laurel Area. 52.1392 Section 52.1392 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Montana § 52.1392 Federal Implementation Plan for...
40 CFR 52.1392 - Federal Implementation Plan for the Billings/Laurel Area.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 4 2014-07-01 2014-07-01 false Federal Implementation Plan for the Billings/Laurel Area. 52.1392 Section 52.1392 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Montana § 52.1392 Federal Implementation Plan for...
40 CFR 52.1392 - Federal Implementation Plan for the Billings/Laurel Area.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 4 2011-07-01 2011-07-01 false Federal Implementation Plan for the Billings/Laurel Area. 52.1392 Section 52.1392 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Montana § 52.1392 Federal Implementation Plan for...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-23
... Promulgation of Air Quality Implementation Plans; West Virginia; Regional Haze State Implementation Plan AGENCY... limited disapproval of West Virginia's Regional Haze State Implementation Plan (SIP) revision. EPA is... mandatory Class I areas through a regional haze program. EPA is also approving this revision as meeting the...
77 FR 65151 - Finding of Substantial Inadequacy of Implementation Plan; Call for California State...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-25
... the Federal Register on September 19, 2012. In that action, in response to a remand by the Ninth... Substantial Inadequacy of Implementation Plan; Call for California State Implementation Plan Revision; South... State Implementation Plan (SIP) for the Los Angeles-South Coast Air Basin (South Coast) is substantially...
40 CFR 93.118 - Criteria and procedures: Motor vehicle emissions budget.
Code of Federal Regulations, 2012 CFR
2012-07-01
... PLANS Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and..., consultation among federal, State, and local agencies occurred; full implementation plan documentation was... response to comments that are required to be submitted with any implementation plan. EPA will document its...
40 CFR 93.118 - Criteria and procedures: Motor vehicle emissions budget.
Code of Federal Regulations, 2014 CFR
2014-07-01
... PLANS Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and..., consultation among federal, State, and local agencies occurred; full implementation plan documentation was... response to comments that are required to be submitted with any implementation plan. EPA will document its...
14 CFR 415.117 - Ground safety.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Ground safety. 415.117 Section 415.117... From a Non-Federal Launch Site § 415.117 Ground safety. (a) General. An applicant's safety review document must include a ground safety analysis report, and a ground safety plan for its launch processing...
14 CFR 415.117 - Ground safety.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Ground safety. 415.117 Section 415.117... From a Non-Federal Launch Site § 415.117 Ground safety. (a) General. An applicant's safety review document must include a ground safety analysis report, and a ground safety plan for its launch processing...
40 CFR 49.10046 - Contents of implementation plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10046 Contents of implementation plan. The implementation plan for the Reservation of the Cow Creek Band of Umpqua Indians consists of the following rules...
Evolution of the Lunar Network
NASA Technical Reports Server (NTRS)
Gal-Edd, Jonathan; Fatig, Curtis C.; Miller, Ron
2008-01-01
The National Aeronautics and Space Administration (NASA) is planning to upgrade its network Infrastructure to support missions for the 21st century. The first step is to increase the data rate provided to science missions to at least the 100 megabits per second (Mbps) range. This is under way, using Ka-band 26 Gigahertz (GHz), erecting an 18-meter antenna for the Lunar Reconnaissance Orbiter (LRO), and the planned upgrade of the Deep Space Network (DSN) 34-meter network to support the James Webb Space Telescope (JWST). The next step is the support of manned missions to the Moon and beyond. Establishing an outpost with several activities such as rovers, colonization, and observatories, is better achieved by using a network configuration rather than the current method of point-to-point communication. Another challenge associated with the Moon is communication coverage with the Earth. The Moon's South Pole, targeted for human habitat and exploration, is obscured from Earth view for half of the 28-day lunar cycle and requires the use of lunar relay satellites to provide coverage when there is no direct view of the Earth. The future NASA and Constellation network architecture is described in the Space Communications Architecture Working Group (SCAWG) Report. The Space Communications and Navigation (SCAN) Constellation Integration Project (SCIP) is responsible for coordinating Constellation requirements and has assigned the responsibility for implementing these requirements to the existing NASA communication providers: DSN, Space Network (SN), Ground Network (GN) and the NASA Integrated Services Network (NISN). The SCAWG Report provides a future architecture but does not provide implementation details. The architecture calls for a Netcentric system, using hundreds of 12-meter antennas, a ground antenna array, and a relay network around the Moon. The report did not use cost as a variable in determining the feasibility of this approach. As part of the SCIP Mission Concept Review and the second iteration of the Lunar Architecture Team (LAT), the focus is on cost, as well as communication coverage using operational scenarios. This approach maximizes use of existing assets and adds capability in small increments. This paper addresses architecture decisions such as the Radio Frequency (RF) signal and network (Netcentric) decisions that need to be made and the difficulty of implementing them into the existing Space Network and DSN. It discusses the evolution of the lunar system and describes its components: Tracking and Data Relay Satellite System (TDRSS), Earth-based ground stations, Lunar Relay, and surface systems.
ERIC Educational Resources Information Center
Daigneau, William A.
2003-01-01
Addresses four questions regarding implementation of a long-term capital plan to manage a college's facilities portfolio: When should the projects be implemented? How should the capital improvements be implemented? What will it actually cost in terms of project costs as well as operating costs? Who will implement the plan? (EV)
40 CFR 52.1973 - Approval of plans.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oregon § 52.1973 Approval of plans. (a) Carbon monoxide. (1) EPA approves as a revision to the Oregon State Implementation Plan, the Second... December 27, 2004. (2) EPA approves as a revision to the Oregon State Implementation Plan, the Salem carbon...
40 CFR 52.1973 - Approval of plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oregon § 52.1973 Approval of plans. (a) Carbon monoxide. (1) EPA approves as a revision to the Oregon State Implementation Plan, the Second... December 27, 2004. (2) EPA approves as a revision to the Oregon State Implementation Plan, the Salem carbon...
40 CFR 52.1973 - Approval of plans.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oregon § 52.1973 Approval of plans. (a) Carbon monoxide. (1) EPA approves as a revision to the Oregon State Implementation Plan, the Second... December 27, 2004. (2) EPA approves as a revision to the Oregon State Implementation Plan, the Salem carbon...
40 CFR 52.1973 - Approval of plans.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS (CONTINUED) Oregon § 52.1973 Approval of plans. (a) Carbon monoxide. (1) EPA approves as a revision to the Oregon State Implementation Plan, the Second... December 27, 2004. (2) EPA approves as a revision to the Oregon State Implementation Plan, the Salem carbon...
49 CFR 633.27 - Implementation of a project management plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...
49 CFR 633.27 - Implementation of a project management plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 7 2011-10-01 2011-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...
49 CFR 633.27 - Implementation of a project management plan.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 7 2012-10-01 2012-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...
49 CFR 633.27 - Implementation of a project management plan.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 7 2014-10-01 2014-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...
49 CFR 633.27 - Implementation of a project management plan.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 7 2013-10-01 2013-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-22
... advance and available for prompt implementation once triggered. Section 110(k)(5) of the CAA provides that... Environmental protection, Air pollution control, Iowa, Particulate matter, State Implementation Plan. Dated...
System control of an autonomous planetary mobile spacecraft
NASA Technical Reports Server (NTRS)
Dias, William C.; Zimmerman, Barbara A.
1990-01-01
The goal is to suggest the scheduling and control functions necessary for accomplishing mission objectives of a fairly autonomous interplanetary mobile spacecraft, while maximizing reliability. Goals are to provide an extensible, reliable system conservative in its use of on-board resources, while getting full value from subsystem autonomy, and avoiding the lure of ground micromanagement. A functional layout consisting of four basic elements is proposed: GROUND and SYSTEM EXECUTIVE system functions and RESOURCE CONTROL and ACTIVITY MANAGER subsystem functions. The system executive includes six subfunctions: SYSTEM MANAGER, SYSTEM FAULT PROTECTION, PLANNER, SCHEDULE ADAPTER, EVENT MONITOR and RESOURCE MONITOR. The full configuration is needed for autonomous operation on Moon or Mars, whereas a reduced version without the planning, schedule adaption and event monitoring functions could be appropriate for lower-autonomy use on the Moon. An implementation concept is suggested which is conservative in use of system resources and consists of modules combined with a network communications fabric. A language concept termed a scheduling calculus for rapidly performing essential on-board schedule adaption functions is introduced.
NASA Technical Reports Server (NTRS)
Llewellyn, J. A.
1967-01-01
The Launch Complex 37 lightning strike of July 27, 1967, was reviewed and compared to a similar incident on the Gemini Program. Available data indicate little likelihood of damaging currents having been present in SA-204 Launch Vehicle or the ground equipment during the July 27th incident. Based on the results of subsystem and system testing after the strike, anticipated results of future testing, the six months elapsed time between the strike-and launch, and the fact that much of the critical airborne electrical/electronic equipment has been removed since the strike for other reasons, no new actions are considered necessary at this time in the Gemini case, significant failures occurred in both airborne and ground circuits. Due to the resultant semi, condlictor uncertainty, and the relatively' short time prior to planned launch, all critical airborne components containing semiconduetors were replaced, and a sophisticated data comparison task was implemented.
Bio-refinery approach for spent coffee grounds valorization.
Mata, Teresa M; Martins, António A; Caetano, Nídia S
2018-01-01
Although normally seen as a problem, current policies and strategic plans concur that if adequately managed, waste can be a source of the most interesting and valuable products, among which metals, oils and fats, lignin, cellulose and hemicelluloses, tannins, antioxidants, caffeine, polyphenols, pigments, flavonoids, through recycling, compound recovery or energy valorization, following the waste hierarchy. Besides contributing to more sustainable and circular economies, those products also have high commercial value when compared to the ones obtained by currently used waste treatment methods. In this paper, it is shown how the bio-refinery framework can be used to obtain high value products from organic waste. With spent coffee grounds as a case study, a sequential process is used to obtain first the most valuable, and then other products, allowing proper valorization of residues and increased sustainability of the whole process. Challenges facing full development and implementation of waste based bio-refineries are highlighted. Copyright © 2017 Elsevier Ltd. All rights reserved.
An Evolvable Multi-Agent Approach to Space Operations Engineering
NASA Technical Reports Server (NTRS)
Mandutianu, Sanda; Stoica, Adrian
1999-01-01
A complex system of spacecraft and ground tracking stations, as well as a constellation of satellites or spacecraft, has to be able to reliably withstand sudden environment changes, resource fluctuations, dynamic resource configuration, limited communication bandwidth, etc., while maintaining the consistency of the system as a whole. It is not known in advance when a change in the environment might occur or when a particular exchange will happen. A higher degree of sophistication for the communication mechanisms between different parts of the system is required. The actual behavior has to be determined while the system is performing and the course of action can be decided at the individual level. Under such circumstances, the solution will highly benefit from increased on-board and on the ground adaptability and autonomy. An evolvable architecture based on intelligent agents that communicate and cooperate with each other can offer advantages in this direction. This paper presents an architecture of an evolvable agent-based system (software and software/hardware hybrids) as well as some plans for further implementation.
SCOS 2: A distributed architecture for ground system control
NASA Astrophysics Data System (ADS)
Keyte, Karl P.
The current generation of spacecraft ground control systems in use at the European Space Agency/European Space Operations Centre (ESA/ESOC) is based on the SCOS 1. Such systems have become difficult to manage in both functional and financial terms. The next generation of spacecraft is demanding more flexibility in the use, configuration and distribution of control facilities as well as functional requirements capable of matching those being planned for future missions. SCOS 2 is more than a successor to SCOS 1. Many of the shortcomings of the existing system have been carefully analyzed by user and technical communities and a complete redesign was made. Different technologies were used in many areas including hardware platform, network architecture, user interfaces and implementation techniques, methodologies and language. As far as possible a flexible design approach has been made using popular industry standards to provide vendor independence in both hardware and software areas. This paper describes many of the new approaches made in the architectural design of the SCOS 2.
Sensor Webs: Autonomous Rapid Response to Monitor Transient Science Events
NASA Technical Reports Server (NTRS)
Mandl, Dan; Grosvenor, Sandra; Frye, Stu; Sherwood, Robert; Chien, Steve; Davies, Ashley; Cichy, Ben; Ingram, Mary Ann; Langley, John; Miranda, Felix
2005-01-01
To better understand how physical phenomena, such as volcanic eruptions, evolve over time, multiple sensor observations over the duration of the event are required. Using sensor web approaches that integrate original detections by in-situ sensors and global-coverage, lower-resolution, on-orbit assets with automated rapid response observations from high resolution sensors, more observations of significant events can be made with increased temporal, spatial, and spectral resolution. This paper describes experiments using Earth Observing 1 (EO-1) along with other space and ground assets to implement progressive mission autonomy to identify, locate and image with high resolution instruments phenomena such as wildfires, volcanoes, floods and ice breakup. The software that plans, schedules and controls the various satellite assets are used to form ad hoc constellations which enable collaborative autonomous image collections triggered by transient phenomena. This software is both flight and ground based and works in concert to run all of the required assets cohesively and includes software that is model-based, artificial intelligence software.
Developing and Implementing a Citywide Asthma Action Plan: A Community Collaborative Partnership.
Staudt, Amanda Marie; Alamgir, Hasanat; Long, Debra Lynn; Inscore, Stephen Curtis; Wood, Pamela Runge
2015-12-01
Asthma affects 1 in 10 children in the United States, with higher prevalence among children living in poverty. Organizations in San Antonio, Texas, partnered to design and implement a uniform, citywide asthma action plan to improve asthma management capacity in schools. The asthma action plan template was modified from that of the Global Initiative for Asthma. School personnel were trained in symptom recognition, actions to take, and use of equipment before the asthma action plan implementation. The annual Asthma Action Plan Summit was organized as a forum for school nurses, healthcare providers, and members of the community to exchange ideas and strategies on implementation, as well as to revise the plan. The asthma action plan was implemented in all 16 local school districts. Feedback received from school nurses suggests that the citywide asthma action plan resulted in improved asthma management and student health at schools. The evidence in this study suggests that community organizations can successfully collaborate to implement a citywide health initiative similar to the asthma action plan.
NASA Astrophysics Data System (ADS)
Sappington, Rodney W.
2005-04-01
In research conducted at academic and community hospitals in the United States since 2001, this paper examines complex human and technological relationships employed to renegotiate behavior within hospital administrative and clinical cultures. In the planning and implementation of PACS in a four-facility hospital we will enter into what can be described as processes of "adoption" and "resistance", seemingly opposite approaches to system implementation, which I argue are in fact key responses to planning, design, and customization of imaging and information systems in a context of convergence. In a larger context of convergence known as NBIC tools (nanotechnology, biotechnology, information technology, and cognitive sciences) it has become increasingly clear to leaders in the field that it is essential to redesign organizational technologies. A novel system has little chance of being fully utilized by conventional organizational structures in an era of system convergence. The challenge of embracing a larger systems perspective lies in opening untapped potential within the healthcare enterprise by preparing the ground for reflection on new approaches to training, and bridging specialized knowledge across computer engineering, clinical decision making, and organizational perspectives for the benefit of patient care. Case studies will demonstrate how organizational and system design technologies are crucial in insuring that PACS implementation strategies can encourage the emergence of new levels of quality for patient care. The goal is to provide successful design-build models that are true to organizational specificity, persons, and clinical practices undergoing change and uncertainty.
Making strategy: learning by doing.
Christensen, C M
1997-01-01
Companies find it difficult to change strategy for many reasons, but one stands out: strategic thinking is not a core managerial competence at most companies. Executives hone their capabilities by tackling problems over and over again. Changing strategy, however, is not usually a task that they face repeatedly. Once companies have found a strategy that works, they want to use it, not change it. Consequently, most managers do not develop a competence in strategic thinking. This Manager's Tool Kit presents a three-stage method executives can use to conceive and implement a creative and coherent strategy themselves. The first stage is to identify and map the driving forces that the company needs to address. The process of mapping provides strategy-making teams with visual representations of team members' assumptions, those pictures, in turn, enable managers to achieve consensus in determining the driving forces. Once a senior management team has formulated a new strategy, it must align the strategy with the company's resource-allocation process to make implementation possible. Senior management teams can translate their strategy into action by using aggregate project planning. And management teams that link strategy and innovation through that planning process will develop a competence in implementing strategic change. The author guides the reader through the three stages of strategy making by examining the case of a manufacturing company that was losing ground to competitors. After mapping the driving forces, the company's senior managers were able to devise a new strategy that allowed the business to maintain a competitive advantage in its industry.
A scientific operations plan for the NASA space telescope. [ground support systems, project planning
NASA Technical Reports Server (NTRS)
West, D. K.; Costa, S. R.
1975-01-01
A ground system is described which is compatible with the operational requirements of the space telescope. The goal of the ground system is to minimize the cost of post launch operations without seriously compromising the quality and total throughput of space telescope science, or jeopardizing the safety of the space telescope in orbit. The resulting system is able to accomplish this goal through optimum use of existing and planned resources and institutional facilities. Cost is also reduced and efficiency in operation increased by drawing on existing experience in interfacing guest astronomers with spacecraft as well as mission control experience obtained in the operation of present astronomical spacecraft.
A Modernized Approach to Meet Diversified Earth Observing System (EOS) AM-1 Mission Requirements
NASA Technical Reports Server (NTRS)
Newman, Lauri Kraft; Hametz, Mark E.; Conway, Darrel J.
1998-01-01
From a flight dynamics perspective, the EOS AM-1 mission design and maneuver operations present a number of interesting challenges. The mission design itself is relatively complex for a low Earth mission, requiring a frozen, Sun-synchronous, polar orbit with a repeating ground track. Beyond the need to design an orbit that meets these requirements, the recent focus on low-cost, "lights out" operations has encouraged a shift to more automated ground support. Flight dynamics activities previously performed in special facilities created solely for that purpose and staffed by personnel with years of design experience are now being shifted to the mission operations centers (MOCs) staffed by flight operations team (FOT) operators. These operators' responsibilities include flight dynamics as a small subset of their work; therefore, FOT personnel often do not have the experience to make critical maneuver design decisions. Thus, streamlining the analysis and planning work required for such a complicated orbit design and preparing FOT personnel to take on the routine operation of such a spacecraft both necessitated increasing the automation level of the flight dynamics functionality. The FreeFlyer(trademark) software developed by AI Solutions provides a means to achieve both of these goals. The graphic interface enables users to interactively perform analyses that previously required many parametric studies and much data reduction to achieve the same result. In addition, the fuzzy logic engine .enables the simultaneous evaluation of multiple conflicting constraints, removing the analyst from the loop and allowing the FOT to perform more of the operations without much background in orbit design. Modernized techniques were implemented for EOS AM-1 flight dynamics support in several areas, including launch window determination, orbit maintenance maneuver control strategies, and maneuver design and calibration automation. The benefits of implementing these techniques include increased fuel available for on-orbit maneuvering, a simplified orbit maintenance process to minimize science data downtime, and an automated routine maneuver planning process. This paper provides an examination of the modernized techniques implemented for EOS AM-1 to achieve these benefits.
A modernized approach to meet diversified earth observing system (EOS) AM-1 mission requirements
NASA Technical Reports Server (NTRS)
Newman, Lauri Kraft; Hametz, Mark E.; Conway, Darrel J.
1998-01-01
From a flight dynamics perspective, the EOS AM-1 mission design and maneuver operations present a number of interesting challenges. The mission design itself is relatively complex for a low Earth mission, requiring a frozen, Sun-synchronous, polar orbit with a repeating ground track. Beyond the need to design an orbit that meets these requirements, the recent focus on low-cost, 'lights out' operations has encouraged a shift to more automated ground support. Flight dynamics activities previously performed in special facilities created solely for that purpose and staffed by personnel with years of design experience are now being shifted to the mission operations centers (MOCs) staffed by flight operations team (FOT) operators. These operators' responsibilities include flight dynamics as a small subset of their work; therefore, FOT personnel often do not have the experience to make critical maneuver design decisions. Thus, streamlining the analysis and planning work required for such a complicated orbit design and preparing FOT personnel to take on the routine operation of such a spacecraft both necessitated increasing the automation level of the flight dynamics functionality. The FreeFlyer(TM) software developed by AI Solutions provides a means to achieve both of these goals. The graphic interface enables users to interactively perform analyses that previously required many parametric studies and much data reduction to achieve the same result In addition, the fuzzy logic engine enables the simultaneous evaluation of multiple conflicting constraints, removing the analyst from the loop and allowing the FOT to perform more of the operations without much background in orbit design. Modernized techniques were implemented for EOS AM-1 flight dynamics support in several areas, including launch window determination, orbit maintenance maneuver control strategies, and maneuver design and calibration automation. The benefits of implementing these techniques include increased fuel available for on-orbit maneuvering, a simplified orbit maintenance process to minimize science data downtime, and an automated routine maneuver planning process. This paper provides an examination of the modernized techniques implemented for EOS AM-1 to achieve these benefits.
Zimmerman, Lindsey; Lounsbury, David W; Rosen, Craig S; Kimerling, Rachel; Trafton, Jodie A; Lindley, Steven E
2016-11-01
Implementation planning typically incorporates stakeholder input. Quality improvement efforts provide data-based feedback regarding progress. Participatory system dynamics modeling (PSD) triangulates stakeholder expertise, data and simulation of implementation plans prior to attempting change. Frontline staff in one VA outpatient mental health system used PSD to examine policy and procedural "mechanisms" they believe underlie local capacity to implement evidence-based psychotherapies (EBPs) for PTSD and depression. We piloted the PSD process, simulating implementation plans to improve EBP reach. Findings indicate PSD is a feasible, useful strategy for building stakeholder consensus, and may save time and effort as compared to trial-and-error EBP implementation planning.
Decadal Vision Progress Report Implementation Plans and Status for the Next Generation ARM Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mather, James
The reconfiguration of the ARM facility, formally initiated in early 2014, is geared toward implementing the Next Generation of the ARM Facility, which will more tightly link ARM measurements and atmospheric models. The strategy is outlined in the ARM Climate Research Facility Decadal Vision (DOE 2014a). The strategy includes the implementation of a high-resolution model, initially at the Southern Great Plains (SGP) site, and enhancements at the SGP and North Slope of Alaska (NSA) sites to provide additional observations to support modeling and process studies. Enhancements at the SGP site focus on ground-based instruments while enhancements at the NSA makemore » use of Unmanned Aerial Systems (UAS) and Tethered Balloon Systems (TBS). It is also recognized that new data tools and data products will need to be developed to take full advantage of these improvements. This document provides an update on the status of these ARM facility enhancements, beginning with the measurement enhancements at the SGP and NSA, followed by a discussion of the modeling project including associated data-processing activities.« less
NASA Astrophysics Data System (ADS)
Pearlman, Michael R.; Ma, Chopo; Neilan, Ruth; Noll, Carey; Pavlis, Erricos; Saunier, Jérôme; Schoene, Tilo; Barzaghi, Riccardo; Thaller, Daniela; Bergstrand, Sten; Mueller, Juergen
2017-04-01
Working with the IAG geometric services (VLBI, SLR, GNSS, and DORIS) the Bureau continues to advocate for the expansion and upgrade of the space geodesy networks for the maintenance and improvement of the reference frame and other application, and for the extension and integration with other techniques. New sites are being established following the GGOS concept of "core" and co-location sites; new technologies are being implemented to enhance performance in data yield as well as accuracy. In particular, several groups are undertaking initiatives and seeking partnerships to update existing sites and expand the networks in geographic areas void of coverage. The Bureau continues to meet with organizations to discuss possibilities of new and expanded participation and to promote the concept of partnerships. The Bureau provides the opportunity for representatives from the services to meet and share progress and plans, and to discuss issues of common interest. The Bureau monitors the status and projects the evolution of the network based on information from the current and expected future participants. Of particular interest at the moment is the integration of gravity and tide gauge networks. The Committees and Joint Working Groups play an essential role in the Bureau activity. The Standing Committee on Performance Simulations and Architectural Trade-off (PLATO) uses simulation and analysis techniques to project future network capability and to examine trade-off options. The Committee on Data and Information is working on a strategy for a GGOS metadata system on a near term plan for data products and a more comprehensive longer-term plan for an all-inclusive system. The Committee on Satellite Missions is working to enhance communication with the space missions, to advocate for missions that support GGOS goals and to enhance ground systems support. The IERS Working Group on Site Survey and Co-location (also participating in the Bureau) is working to enhance standardization in procedures, outreach and to encourage new survey groups to participate, and improve procedures to determine systems reference points. The 2017-2018 Implementation Plan for the GGOS Bureau of Networks and Observations has been posted on the GGOS website. We will outline progress over the past two years and discuss the status of the network and updated plan.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-09
... Promulgation of Air Quality Implementation Plans; Minnesota; Carbon Monoxide (CO) Limited Maintenance Plan for... June 16, 2010, to revise the Minnesota State Implementation Plan (SIP) for carbon monoxide (CO) under the Clean Air Act (CAA). The State has submitted a limited maintenance plan for CO showing continued...
40 CFR 49.9861 - Identification of plan.
Code of Federal Regulations, 2010 CFR
2010-07-01
... TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9861 Identification of plan. This section and §§ 49.9862 through 49.9890 contain the implementation plan for the Burns Paiute Tribe of the Burns...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-14
... Promulgation of Implementation Plans--Maricopa County (Phoenix) PM-10 Nonattainment Area; Serious Area Plan for... implementation plan (SIP) revisions submitted by the State of Arizona to meet, among other requirements, section... (Maricopa area). Specifically, EPA proposed to disapprove provisions of the 189(d) plan because they do not...
An evaluation of public participation in UK river basin management planning
NASA Astrophysics Data System (ADS)
Schmid, M.; Benson, D.
2012-04-01
The EU Water Framework Directive is reshaping multi-level environmental governance structures in many Member States. One area where re-structuring should be highly visible is in regards to public participation in water management. The Directive legally mandates that implementing agencies should make information publicly available relating to river basin management planning, include the public in the planning process and encourage the active involvement of 'interested parties' both during and after the planning stage. Yet critical questions arise over the extent to which these requirements have actually been met in Member States and the outcomes of participatory processes on the ground. In this study, public participation was evaluated in England and Wales by conducting: a) a broad based quantitative survey of the implementation strategy undertaken across all 11 River Basin Districts (RBDs); and, b) an in-depth analysis of the Anglian RBD drawing on theoretical notions of social learning; a critical measure of participatory processes. Results from the survey showed all RBDs complied with the minimum regulatory requirements on public access to information and written consultation, and even went further with provisions for oral consultation and stakeholder engagement. But the focus was clearly on stakeholder groups with little public involvement beyond minimal legally mandated requirements. Analysis of case study data provided some evidence of social learning at every level (instrumental, communicative and transformative) and beyond the individual scale (wider community and organisational learning). Learning was however significantly limited by participant's high level of expertise and environmental awareness. Also apparent was the influence of other factors, operating at various institutional scales, in shaping learning. The paper then speculates on the implications of the findings for both future research and policy, particularly in light of the European Commission's upcoming review of EU water policy.
Momin, Behnoosh; Neri, Antonio; Goode, Sonya A; Sarris Esquivel, Nikie; Schmitt, Carol L; Kahende, Jennifer; Zhang, Lei; Stewart, Sherri L
2015-05-28
Historically, federal funding streams to address cancer and tobacco use have been provided separately to state health departments. This study aims to document the impact of a recent focus on coordinating chronic disease efforts through collaboration between the 2 programs. Through a case-study approach using semistructured interviews, we collected information on the organizational context, infrastructure, and interaction between cancer and tobacco control programs in 6 states from March through July 2012. Data were analyzed with NVivo software, using a grounded-theory approach. We found between-program activities in the state health department and coordinated implementation of interventions in the community. Factors identified as facilitating integrated interventions in the community included collaboration between programs in the strategic planning process, incorporation of one another's priorities into state strategic plans, co-location, and leadership support for collaboration. Coalitions were used to deliver integrated interventions to the community. Five states perceived high staff turnover as a barrier to collaboration, and all 5 states felt that federal funding requirements were a barrier. Cancer and tobacco programs are beginning to implement integrated interventions to address chronic disease. Findings can inform the development of future efforts to integrate program activities across chronic disease prevention efforts.
NASA Technical Reports Server (NTRS)
Rocco, David A.
1994-01-01
Redefining the approach and philosophy that operations management uses to define, develop, and implement space missions will be a central element in achieving high efficiency mission operations for the future. The goal of a cost effective space operations program cannot be realized if the attitudes and methodologies we currently employ to plan, develop, and manage space missions do not change. A management philosophy that is in synch with the environment in terms of budget, technology, and science objectives must be developed. Changing our basic perception of mission operations will require a shift in the way we view the mission. This requires a transition from current practices of viewing the mission as a unique end product, to a 'mission development concept' built on the visualization of the end-to-end mission. To achieve this change we must define realistic mission success criteria and develop pragmatic approaches to achieve our goals. Custom mission development for all but the largest and most unique programs is not practical in the current budget environment, and we simply do not have the resources to implement all of our planned science programs. We need to shift our management focus to allow us the opportunity make use of methodologies and approaches which are based on common building blocks that can be utilized in the space, ground, and mission unique segments of all missions.
Program Planning in Health Professions Education
ERIC Educational Resources Information Center
Schmidt, Steven W.; Lawson, Luan
2018-01-01
In this chapter, the major concepts from program planning in adult education will be applied to health professions education (HPE). Curriculum planning and program planning will be differentiated, and program development and planning will be grounded in a systems thinking approach.
Design requirements for SRB production control system. Volume 4: Implementation
NASA Technical Reports Server (NTRS)
1981-01-01
The implementation plan which is presented was developed to provide the means for the successful implementation of the automated production control system. There are three factors which the implementation plan encompasses: detailed planning; phased implementation; and user involvement. The plan is detailed to the task level in terms of necessary activities as the system is developed, refined, installed, and tested. These tasks are scheduled, on a preliminary basis, over a two-and-one-half-year time frame.
NASA Technical Reports Server (NTRS)
Bach, David A.; Brand, Susan N.; Hasbrook, Peter V.
2013-01-01
Following the failure of 44 Progress (44P) on launch in August 2011, and the subsequent grounding of all Russian Soyuz rocket based launches, the International Space Station (ISS) ground teams engaged in an effort to determine how long the ISS could remain crewed, what would be required to safely configure the ISS for decrewing, and what would be required to recrew the ISS upon resumption of Soyuz rocket launches if decrewing became necessary. This White Paper was written to capture the processes and lessons learned from real-time time events and to provide a reference and training document for ISS Program teams in the event decrewing of the ISS is needed. Through coordination meetings and assessments, teams identified six decrewing priorities for ground and crew operations. These priorities were integrated along with preflight priorities through the Increment re-planning process. Additionally, the teams reviewed, updated, and implemented changes to the governing documentation for the configuration of the ISS for a contingency decrewing event. Steps were taken to identify critical items for disposal prior to decrewing, as well as identifying the required items to be strategically staged or flown with the astronauts and cosmonauts who would eventually recrew the ISS. After the successful launches and dockings of both 45P and 28 Soyuz (28S), the decrewing team transitioned to finalizing and publishing the documentation for standardizing the decrewing flight rules. With the continued launching of crews and cargo to the ISS, utilization and science is again a high priority; both Increment pairs 29 and 30, and Increment 31 and 32 reaching the milestone of at least 35 hours per week average utilization.
NASA Astrophysics Data System (ADS)
Bach, David A.; Brand, Susan N.; Hasbrook, Peter V.
2013-09-01
Following the failure of 44 Progress (44P) on launch in August 2011, and the subsequent grounding of all Russian Soyuz rocket based launches, the International Space Station (ISS) ground teams engaged in an effort to determine how long the ISS could remain crewed, what would be required to safely configure the ISS for decrewing, and what would be required to recrew the ISS upon resumption of Soyuz rocket launches if decrewing became necessary. This White Paper was written to capture the processes and lessons learned from real-time time events and to provide a reference and training document for ISS Program teams in the event decrewing of the ISS is needed.Through coordination meetings and assessments, teams identified six decrewing priorities for ground and crew operations. These priorities were integrated along with preflight priorities through the Increment re-planning process. Additionally, the teams reviewed, updated, and implemented changes to the governing documentation for the configuration of the ISS for a contingency decrewing event. Steps were taken to identify critical items for disposal prior to decrewing, as well as identifying the required items to be strategically staged or flown with the astronauts and cosmonauts who would eventually recrew the ISS.After the successful launches and dockings of both 45P and 28 Soyuz (28S), the decrewing team transitioned to finalizing and publishing the documentation for standardizing the decrewing flight rules. With the continued launching of crews and cargo to the ISS, utilization and science is again a high priority; both Increment pairs 29 and 30, and Increment 31 and 32 reaching the milestone of at least 35 hours per week average utilization.
SOHO Mission Interruption Joint NASA/ESA Investigation Board
NASA Technical Reports Server (NTRS)
1998-01-01
Contact with the SOlar Heliospheric Observatory (SOHO) spacecraft was lost in the early morning hours of June 25, 1998, Eastern Daylight Time (EDT), during a planned period of calibrations, maneuvers, and spacecraft reconfigurations. Prior to this the SOHO operations team had concluded two years of extremely successful science operations. A joint European Space Agency (ESA)/National Aeronautics and Space Administration (NASA) engineering team has been planning and executing recovery efforts since loss of contact with some success to date. ESA and NASA management established the SOHO Mission Interruption Joint Investigation Board to determine the actual or probable cause(s) of the SOHO spacecraft mishap. The Board has concluded that there were no anomalies on-board the SOHO spacecraft but that a number of ground errors led to the major loss of attitude experienced by the spacecraft. The Board finds that the loss of the SOHO spacecraft was a direct result of operational errors, a failure to adequately monitor spacecraft status, and an erroneous decision which disabled part of the on-board autonomous failure detection. Further, following the occurrence of the emergency situation, the Board finds that insufficient time was taken by the operations team to fully assess the spacecraft status prior to initiating recovery operations. The Board discovered that a number of factors contributed to the circumstances that allowed the direct causes to occur. The Board strongly recommends that the two Agencies proceed immediately with a comprehensive review of SOHO operations addressing issues in the ground procedures, procedure implementation, management structure and process, and ground systems. This review process should be completed and process improvements initiated prior to the resumption of SOHO normal operations.
40 CFR 256.42 - Recommendations for assuring facility development.
Code of Federal Regulations, 2014 CFR
2014-07-01
... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.42 Recommendations for assuring facility development. (a) The State plan... facilities, and (4) Development of schedules of implementation. (d) The State plan should encourage private...
40 CFR 256.42 - Recommendations for assuring facility development.
Code of Federal Regulations, 2012 CFR
2012-07-01
... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.42 Recommendations for assuring facility development. (a) The State plan... facilities, and (4) Development of schedules of implementation. (d) The State plan should encourage private...
40 CFR 256.42 - Recommendations for assuring facility development.
Code of Federal Regulations, 2013 CFR
2013-07-01
... WASTES GUIDELINES FOR DEVELOPMENT AND IMPLEMENTATION OF STATE SOLID WASTE MANAGEMENT PLANS Facility Planning and Implementation § 256.42 Recommendations for assuring facility development. (a) The State plan... facilities, and (4) Development of schedules of implementation. (d) The State plan should encourage private...
75 FR 3680 - Revisions to the California State Implementation Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-22
... the California State Implementation Plan AGENCY: Environmental Protection Agency (EPA). ACTION... Pollution Control District (SJVAPCD) portion of the California State Implementation Plan (SIP). These... are taking comments on this proposal and plan to follow with a final action. DATES: Any comments must...
49 CFR 130.33 - Response plan implementation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 2 2014-10-01 2014-10-01 false Response plan implementation. 130.33 Section 130... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a...
49 CFR 130.33 - Response plan implementation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 2 2010-10-01 2010-10-01 false Response plan implementation. 130.33 Section 130... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a...
49 CFR 130.33 - Response plan implementation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 2 2011-10-01 2011-10-01 false Response plan implementation. 130.33 Section 130... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a...
49 CFR 130.33 - Response plan implementation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 2 2012-10-01 2012-10-01 false Response plan implementation. 130.33 Section 130... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a...
49 CFR 130.33 - Response plan implementation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 2 2013-10-01 2013-10-01 false Response plan implementation. 130.33 Section 130... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-16
... Promulgation of Air Quality Implementation Plans; New Mexico; Sunland Park 1-Hour Ozone Maintenance Plan AGENCY... the New Mexico State Implementation Plan (SIP). The revision consists of a maintenance plan for Sunland Park, New Mexico developed to ensure continued attainment of the 8-hour ozone National Ambient Air...
Global Framework for Climate Services (GFCS): implementation approach
NASA Astrophysics Data System (ADS)
Lucio, Filipe
2013-04-01
The Extraordinary Session of the World Meteorological Congress, held from 29 to 31 October 2012, adopted the Implementation Plan of the Global Framework for Climate Services, for the subsequent consideration by the Intergovernmental Board on Climate Services, which will host its first session in July 2013. The Extraordinary Congress called for an immediate move to action, so that the work undertaken can result in activities on the ground which will benefit, in particular, vulnerable countries. The development of the GFCS through a broad consultation process accross the pillars of the GFCS (User Interface Platform; Observations and Monitoring; Climate Services Information System; Research, Modelling and Prediction; and Capacity Development) and the initial four priority areas (Agriculture and Food Security; Water; Health and Disaster Risk Reductio) identified a number of challenges, which in some cases constitute barries to implementation: - Accessibility: many countries do not have climate services at all, and all countries have scope to improve access to such services; - Capacity: many countries lack the capacity to anticipate and managed climate-related risks and opportunities; - Data: the current availability and quality of climate observations and impacts data are inadequate for large parts of the globe; - Partnerships: mechanisms to enhance interaction between climate users and providers are not always well developed, and user requirements are not always adequately understood and addressed; - Quality: operational climate services are lagging advances in climate and applications science, and the spatial and temporal resolution of information to support decision-making is often insufficient to match user requirements. To address these challenges, the Implementation Plan of the GFCS identified initial implementation projects and activities. The initial priority is to establish the leadership and management capacity to take the GFCS forward at all levels. Capacity development is seen as the critical element to build the foundation for progress. This includes but not limited to: - Linking climate services users and providers, e.g., through User Interface mechanisms; - Developing capacities at national level; - Strengthening regional climate capabilities. Taking advantage of exhausting mechanisms and others under planning the GFCS offers an adequate platform for coordination and integration of efforts towards effective action to deliver user tailored climate services. This paper will provide details on the implementation approach of the GFCS and highlight progress made thus far.
Design and Implementation of the PMS Module for ’Argos’
1989-12-01
designing , and implementing a fully workable Planned Maintenance System (PMS). This implementation demonstrates both the capabilities and benefits such a...analyzing, designing , and implementing a fully workable Planned Maintenance System (PMS). This implementation demonstrates both the capabilities and... design and implementation. PMS is the system developed by the navy to provide each ship, department, and supervisor with the tools needed to plan
Implementation of Discharge Plans for Chronically Ill Elders Discharged Home.
ERIC Educational Resources Information Center
Proctor, Enola K.; And Others
1996-01-01
Addresses the extent to which discharge plans for elderly patients with congestive heart failure were implemented as planned, tested the consequences of implementation problems, and identified factors associated with implementation problems. Implications for hospital discharge planners and home health care are discussed. (KW)
Rashidian, Arash; Eccles, Martin P; Russell, Ian
2008-02-01
We aimed to explore key themes for the implementation of guidelines' prescribing recommendations. We interviewed a purposeful sample of 25 participants in British primary care in late 2000 and early 2001. Thirteen were academics in primary care and 12 were non-academic GPs. We asked about implementation of guidelines for five conditions (asthma, coronary heart disease prevention, depression, epilepsy, menorrhagia) ensuring variation in complexity, role of prescribing in patient management, GP role in prescribing and GP awareness of guidelines. We used the Theory of Planned Behaviour to design the study and the framework method for the analysis. Seven themes explain implementation of prescribing recommendations in primary care: credibility of content, credibility of source, presentation, influential people, organisational factors, disease characteristics, and dissemination strategy. Change in recommendations may hinder implementation. This is important since the development of evidence-based guidelines requires change in recommendations. Practitioners do not have a universal view or a common understanding of valid 'evidence'. Credibility is improved if national bodies develop primary care guidelines with less input from secondary care and industry, and with simple and systematic presentation. Dissemination should target GPs' perceived needs, improve ownership and get things right in the first implementation attempt. Enforcement strategies should not be used routinely. GPs were critical of guidelines' development, relevance and implementation. Guidelines should be clear about changes they propose. Future studies should quantify the relationship between evidence base of recommendations and implementation, and between change in recommendations and implementation. Small but important costs and side effects of implementing guidelines should be measured in evaluative studies.
Sakici, Oytun Emre; Kucuk, Omer; Ashraf, Muhammad Irfan
2018-04-15
Small trees and saplings are important for forest management, carbon stock estimation, ecological modeling, and fire management planning. Turkish pine (Pinus brutia Ten.) is a common coniferous species and comprises 25.1% of total forest area of Turkey. Turkish pine is also important due to its flammable fuel characteristics. In this study, compatible above-ground biomass equations were developed to predict needle, branch, stem wood, and above-ground total biomass, and carbon stock assessment was also described for Turkish pine which is smaller than 8 cm diameter at breast height or shorter than breast height. Compatible biomass equations are useful for biomass prediction of small diameter individuals of Turkish pine. These equations will also be helpful in determining fire behavior characteristics and calculating their carbon stock. Overall, present study will be useful for developing ecological models, forest management plans, silvicultural plans, and fire management plans.
NASA Technical Reports Server (NTRS)
Ferell, Bob; Lewis, Mark; Perotti, Jose; Oostdyk, Rebecca; Goerz, Jesse; Brown, Barbara
2010-01-01
This paper's main purpose is to detail issues and lessons learned regarding designing, integrating, and implementing Fault Detection Isolation and Recovery (FDIR) for Constellation Exploration Program (CxP) Ground Operations at Kennedy Space Center (KSC).
DOE Office of Scientific and Technical Information (OSTI.GOV)
Blom, Philip Stephen; Marcillo, Omar Eduardo; Euler, Garrett Gene
InfraPy is a Python-based analysis toolkit being development at LANL. The algorithms are intended for ground-based nuclear detonation detection applications to detect, locate, and characterize explosive sources using infrasonic observations. The implementation is usable as a stand-alone Python library or as a command line driven tool operating directly on a database. With multiple scientists working on the project, we've begun using a LANL git repository for collaborative development and version control. Current and planned work on InfraPy focuses on the development of new algorithms and propagation models. Collaboration with Southern Methodist University (SMU) has helped identify bugs and limitations ofmore » the algorithms. The current focus of usage development is focused on library imports and CLI.« less
ATS-1/ATS-3 dual satellite navigation study
NASA Technical Reports Server (NTRS)
Hoover, W. M.
1971-01-01
A study which illustrated the feasibility of implementing an on-board aircraft navigation system based on using the ATS-1 and ATS-3 satellites, the modified Omega Position Location Equipment (OPLE) Control Center, and a suitable aircraft terminal was conducted. The report provides: (1) a consideration of the problems of satellite navigation and an objective definition of the optimum system under the constraints of its specified components, (2) a description of the necessary modifications to the OPLE Control Center, the design of an aircraft terminal, and the design of ground reference terminals, and (3) an outline of an experiment plan and an estimate of the cost to be expected in conducting the program.
Strategies for Ground Based Testing of Manned Lunar Surface Systems
NASA Technical Reports Server (NTRS)
Beyer, Jeff; Peacock, Mike; Gill, Tracy
2009-01-01
Integrated testing (such as Multi-Element Integrated Test (MEIT)) is critical to reducing risks and minimizing problems encountered during assembly, activation, and on-orbit operation of large, complex manned spacecraft. Provides the best implementation of "Test Like You Fly:. Planning for integrated testing needs to begin at the earliest stages of Program definition. Program leadership needs to fully understand and buy in to what integrated testing is and why it needs to be performed. As Program evolves and design and schedules mature, continually look for suitable opportunities to perform testing where enough components are together in one place at one time. The benefits to be gained are well worth the costs.
Implementation and Simulation Results using Autonomous Aerobraking Development Software
NASA Technical Reports Server (NTRS)
Maddock, Robert W.; DwyerCianciolo, Alicia M.; Bowes, Angela; Prince, Jill L. H.; Powell, Richard W.
2011-01-01
An Autonomous Aerobraking software system is currently under development with support from the NASA Engineering and Safety Center (NESC) that would move typically ground-based operations functions to onboard an aerobraking spacecraft, reducing mission risk and mission cost. The suite of software that will enable autonomous aerobraking is the Autonomous Aerobraking Development Software (AADS) and consists of an ephemeris model, onboard atmosphere estimator, temperature and loads prediction, and a maneuver calculation. The software calculates the maneuver time, magnitude and direction commands to maintain the spacecraft periapsis parameters within design structural load and/or thermal constraints. The AADS is currently tested in simulations at Mars, with plans to also evaluate feasibility and performance at Venus and Titan.
Machine intelligence and robotics: Report of the NASA study group. Executive summary
NASA Technical Reports Server (NTRS)
1979-01-01
A brief overview of applications of machine intelligence and robotics in the space program is given. These space exploration robots, global service robots to collect data for public service use on soil conditions, sea states, global crop conditions, weather, geology, disasters, etc., from Earth orbit, space industrialization and processing technologies, and construction of large structures in space. Program options for research, advanced development, and implementation of machine intelligence and robot technology for use in program planning are discussed. A vigorous and long-range program to incorporate and keep pace with state of the art developments in computer technology, both in spaceborne and ground-based computer systems is recommended.
Ground data handling for Landsat-D. [for thematic mapper
NASA Technical Reports Server (NTRS)
Lynch, T. J.
1977-01-01
The present plans for the Landsat-D ground data handling are described in relationship to the mission objectives and the planned spacecraft system. The end-to-end data system is presented with particular emphasis on the data handling plans for the new instrument, the Thematic Mapper. This instrument generates ten times the amount of data per scene as the present Multispectral Scanner and this resulting data rate and volume are discussed as well as possible new data techniques to handle them - such as image compression.
Ground data handling for LANDSAT-D
NASA Technical Reports Server (NTRS)
Lynch, T. J.
1976-01-01
The present plans for the LANDSAT D ground data handling are described in relationship to the mission objectives and the planned spacecraft system. The end to end data system is presented with particular emphasis on the data handling plans for the new instrument, the Thematic Mapper. This instrument generates ten times the amount of data per scene as the present Multispectral Scanner, and this resulting data rate and volume are discussed as well as possible new data techniques to handle them such as image compression.
Distributed intelligence for ground/space systems
NASA Technical Reports Server (NTRS)
Aarup, Mads; Munch, Klaus Heje; Fuchs, Joachim; Hartmann, Ralf; Baud, Tim
1994-01-01
DI is short for Distributed Intelligence for Ground/Space Systems and the DI Study is one in a series of ESA projects concerned with the development of new concepts and architectures for future autonomous spacecraft systems. The kick-off of DI was in January 1994 and the planned duration is three years. The background of DI is the desire to design future ground/space systems with a higher degree of autonomy than seen in today's missions. The aim of introducing autonomy in spacecraft systems is to: (1) lift the role of the spacecraft operators from routine work and basic troubleshooting to supervision; (2) ease access to and increase availability of spacecraft resources; (3) carry out basic mission planning for users; (4) enable missions which have not yet been feasible due to eg. propagation delays, insufficient ground station coverage etc.; and (5) possibly reduce mission cost. The study serves to identify the feasibility of using state-of-the-art technologies in the area of planning, scheduling, fault detection using model-based diagnosis and knowledge processing to obtain a higher level of autonomy in ground/space systems.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-27
... for OMB Review; Comment Request; Ground Control Plans for Surface Coal Mines and Surface Work Areas of Underground Coal Mines ACTION: Notice. SUMMARY: The Department of Labor (DOL) is submitting the Mine Safety... Control Plans for Surface Coal Mines and Surface Work Areas of Underground Coal Mines,'' to the Office of...
ERIC Educational Resources Information Center
Parker, Elizabeth Cassidy; Bond, Vanessa L.; Powell, Sean R.
2017-01-01
The purpose of this grounded theory study was to understand the process of field experience lesson planning for preservice music educators enrolled in choral, general, and instrumental music education courses within three university contexts. Data sources included multiple interviews, written responses, and field texts from 42 participants. Four…
NASA Astrophysics Data System (ADS)
Yu, F.; Chen, H.; Tu, K.; Wen, Q.; He, J.; Gu, X.; Wang, Z.
2018-04-01
Facing the monitoring needs of emergency responses to major disasters, combining the disaster information acquired at the first time after the disaster and the dynamic simulation result of the disaster chain evolution process, the overall plan for coordinated planning of spaceborne, airborne and ground observation resources have been designed. Based on the analysis of the characteristics of major disaster observation tasks, the key technologies of spaceborne, airborne and ground collaborative observation project are studied. For different disaster response levels, the corresponding workflow tasks are designed. On the basis of satisfying different types of disaster monitoring demands, the existing multi-satellite collaborative observation planning algorithms are compared, analyzed, and optimized.
40 CFR 49.10042 - Approval status.
Code of Federal Regulations, 2010 CFR
2010-07-01
... TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Cow... Tribal rules or measures in the implementation plan for the Reservation of the Cow Creek Band of Umpqua...
Ames Research Center FY 2000 Implementation Plan: Leading Technology into the New Millennium
NASA Technical Reports Server (NTRS)
2000-01-01
This document presents the implementation plan for Ames Research Center (ARC) within the overall framework of the NASA Strategic Plan. It describes how ARC intends to implement its Center of Excellence responsibilities, Agency assigned missions, Agency and Enterprise lead programs, and other roles in support of NASA's vision and mission. All Federal agencies are required by the 1993 Government Performance and Results Act to implement a long-term strategic planning process that includes measurable outcomes and strict accountability. At NASA, this planning process is shaped by the Space Act of 1958, annual appropriations, and other external mandates, as well as by customer requirements. The resulting Strategic Plan sets the overall architecture for what we do, identifies who our customers are, and directs where we are going and why. The Strategic Plan is the basis upon which decisions regarding program implementation and resource deployment are made. Whereas the strategic planning process examines the long-term direction of the organization and identifies a specific set of goals, the implementation planning process examines the detailed performance of the organization and allocates resources toward meeting these goals. It is the purpose of this implementation document to provide the connection between the NASA Strategic Plan and the specific programs and support functions that ARC employees perform. This connection flows from the NASA Strategic Plan, through the various Strategic Enterprise plans to the ARC Center of Excellence, primary missions, Lead Center programs, program support responsibilities, and ultimately, to the role of the individual ARC employee.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-04
... Promulgation of Air Quality Implementation Plans; Indiana; South Bend-Elkhart, Indiana Ozone Maintenance Plan..., Indiana 1997 8-hour ozone maintenance air quality State Implementation Plan (SIP) by replacing the... Vehicle Emissions Simulator (MOVES) 2010a emissions model. Indiana submitted this request to EPA for...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-27
... Promulgation of Implementation Plans; North Carolina: Approval of Rocky Mount Supplemental Motor Vehicle... is proposing to approve a revision to the North Carolina State Implementation Plan (SIP), submitted... supplements the original redesignation request and maintenance plan for Rocky Mount 1997 8-hour ozone area...
77 FR 30212 - Approval and Promulgation of Air Quality Implementation Plans; Vermont; Regional Haze
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-22
... Promulgation of Air Quality Implementation Plans; Vermont; Regional Haze AGENCY: Environmental Protection... Implementation Plan (SIP) that addresses regional haze for the first planning period from 2008 through 2018. The... numerous sources located over a wide geographic area (also referred to as the ``regional haze program...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-09
... Promulgation of State Implementation Plans; Hawaii; Infrastructure Requirements for the 1997 8-Hour Ozone and... State Implementation Plan (SIP) revision submitted by the state of Hawaii pursuant to the requirements... FURTHER INFORMATION CONTACT: Dawn Richmond, Air Planning Office (AIR-2), U.S. Environmental Protection...
Surface target-tracking guidance by self-organizing formation flight of fixed-wing UAV
NASA Astrophysics Data System (ADS)
Regina, N.; Zanzi, M.
This paper presents a new concept of ground target surveillance based on a formation flight of two Unmanned Aerial Vehicles (UAVs) of fixed-wing type. Each UAV considered in this work has its own guidance law specifically designed for two different aims. A self organizing non-symmetric collaborative surveying scheme has been developed based on pursuers with different roles: the close-up-pursuer and the distance-pursuer. The close-up-pursuer behaves according to a guidance law which takes it to continually over-fly the target, also optimizing flight endurance. On the other hand, the distancepursuer behaves so as to circle around the target by flying at a certain distance and altitude from it; moreover, its motion ensures the maximum “ seeability” of the ground based target. In addition, the guidance law designed for the distance-pursuer also implements a collision avoidance feature in order to prevent possible risks of collision with the close-up-pursuer during the tracking maneuvers. The surveying scheme is non-symmetric in the sense that the collision avoidance feature is accomplished by a guidance law implemented only on one of the two pursuers; moreover, it is collaborative because the surveying is performed by different tasks of two UAVs and is self-organizing because, due to the collision avoidance feature, target tracking does not require pre-planned collision-risk-free trajectories but trajectories are generated in real time.
Beyond fighting fires and chasing tails? Chronic illness care plans in Ontario, Canada.
Russell, Grant; Thille, Patricia; Hogg, William; Lemelin, Jacques
2008-01-01
Recent work has conceptualized new models for the primary care management of patients with chronic illness. This study investigated the experience of family physicians and patients with a chronic illness management initiative that involved the joint formulation of comprehensive individual patient care plans. A qualitative evaluation, framed by phenomenology, immediately followed a randomized controlled trial examining the effect of external facilitators in enhancing the delivery of chronic condition care planning in primary care. The study, set in Ontario family practices, used semistructured in-depth interviews with a purposive sample of 13 family physicians, 20 patients, and all 3 study facilitators. Analysis used independent transcript review and constant comparative methods. Despite the intervention being grounded in patient-centered principles, family physicians generally viewed chronic illness management from a predominantly biomedical perspective. Only a few enthusiasts viewed systematic care planning as a new approach to managing patients with chronic illness. Most family physicians found the strategy to be difficult to implement within existing organizational and financial constraints. For these participants, care planning conflicted with preexisting concepts of their role and of their patient's abilities to become partners in care. The few patients who noticed the process spoke favorably about their experience. Although the experiences of the enthusiastic family physicians were encouraging, we found important individual-level barriers to chronic illness management in primary care. These issues seemed to transcend existing organizational and resource constraints.
LG-ANALYST: linguistic geometry for master air attack planning
NASA Astrophysics Data System (ADS)
Stilman, Boris; Yakhnis, Vladimir; Umanskiy, Oleg
2003-09-01
We investigate the technical feasibility of implementing LG-ANALYST, a new software tool based on the Linguistic Geometry (LG) approach. The tool will be capable of modeling and providing solutions to Air Force related battlefield problems and of conducting multiple experiments to verify the quality of the solutions it generates. LG-ANALYST will support generation of the Fast Master Air Attack Plan (MAAP) with subsequent conversion into Air Tasking Order (ATO). An Air Force mission is modeled employing abstract board games (ABG). Such a mission may include, for example, an aircraft strike package moving to a target area with the opposing side having ground-to-air missiles, anti-aircraft batteries, fighter wings, and radars. The corresponding abstract board captures 3D air space, terrain, the aircraft trajectories, positions of the batteries, strategic features of the terrain, such as bridges, and their status, radars and illuminated space, etc. Various animated views are provided by LG-ANALYST including a 3D view for realistic representation of the battlespace and a 2D view for ease of analysis and control. LG-ANALYST will allow a user to model full scale intelligent enemy, plan in advance, re-plan and control in real time Blue and Red forces by generating optimal (or near-optimal) strategies for all sides of a conflict.
Thompson, Debbe; Bhatt, Riddhi; Vazquez, Isabel; Cullen, Karen W; Baranowski, Janice; Baranowski, Tom; Liu, Yan
2015-03-18
Child fruit and vegetable intake is below recommended levels, increasing risk for chronic disease. Interventions to influence fruit and vegetable intake among youth have had mixed effects. Innovative, theory-driven interventions are needed. Goal setting, enhanced by implementation intentions (i.e., plans tightly connected to a behavioral goal), may offer a solution. Action plans state "how" a goal will be achieved, while coping plans identify a potential barrier and corresponding solution. The research reported here evaluated the short- and long-term effects of goal setting enhanced with implementation intentions on child fruit and vegetable intake in a 10-episode, theoretically-grounded serious videogame promoting fruit and vegetables. This is one of the first studies to test the efficacy of implementation intentions on the dietary intake of healthy children. A four-group randomized design with three data collection periods (baseline, immediate post-intervention, 3 months post-intervention) was employed. Groups varied on whether children created an implementation intention (none, action, coping, both) as part of goal setting. Participants were 4th and 5th grade children (~9-11 years old) and one parent. An a priori power analysis indicated this would provide >80% power to detect a small effect (Cohen's d = 0.17). Children played a 10-episode online videogame; parents received 10 electronic newsletters and access to a parent-only website. The primary outcome was child fruit and vegetable intake, assessed via three, dietitian-assisted telephone recalls at each data collection period. The primary analysis was conducted using a repeated measures analysis of covariance with a mixed model procedure. Secondary analyses examined intervention effects on fruit and vegetables separately. Four hundred parent/child dyads were recruited. A significant group-by-time interaction for fruit and vegetable intake (p < 0.001) was found in only the Action group, which had significant increases in fruit and vegetable intake at post 1 (p < 0.0001) and post 2 (p < 0.0001). No other significant interactions were observed; however, there were significant time effects for fruit (p < 0.0001). Action intentions may be an important component of successful interventions to increase and maintain fruit and vegetable intake in pre-adolescent children. Videogames promoting healthy diets offer an effective vehicle for delivering behavior change interventions to children. ClinicalTrials.gov NCT01004094 .
Observation-well network for collection of ground-water level data in Massachusetts
Socolow, Roy S.
1994-01-01
Aquifers--water-bearing deposits of sand and gravel, glacial till, and fractured bedrock--provide an extensive and readily accessible ground-water supply in Massachusetts. Ground water affects our everyday lives, not just in terms of how much water is available, but also in terms of the position of ground-water levels in relation to land surface. Knowledge of ground-water levels is needed by Federal, State, and local agencies to help plan, manage, and protect ground-water supplies, and by private construction companies for site planning and evaluation. A primary part of the mission of the U.S. Geological Survey (USGS), Water Resources Division, is the systematic collection of ground-water, surface-water, and water-quality data. These data are needed to manage and protect the nation's water resources. The Massachusetts-Rhode Island District of the USGS, in cooperation with the Massachusetts Department of Environmental Management (DEM), Office of Water Resources, and county and town environmental agencies, has maintained a network of observation wells throughout the Commonwealth since the mid 1930's. The purpose of this network is to monitor seasonal and long-term changes in groundwater storage in different lithologic, topographic, and geographic settings. These data are analyzed to provide a monthly index of ground-water conditions to aid in water-resources management and planning, and to define long-term changes in water levels resulting from manmade stresses (such as pumping and construction-site drainage) and natural stresses (such as floods and droughts).
Mitchell, S E; Weigel, G M; Laurens, V; Martin, J; Jack, B W
2017-04-19
Project Re-Engineered Discharge (RED) is an evidence-based strategy to reduce readmissions disseminated and adapted by various health systems across the country. To date, little is known about how adapting Project RED from its original protocol impacts RED implementation and/or sustainability. The goal of this study was to identify and characterize contextual factors influencing how five California hospitals adapted and implemented RED and the subsequent impact on RED program sustainability. Participant observation and key informant and focus group interviews with 64 individuals at five California hospitals implementing RED in 2012 and 2013 were conducted. These involved hospital leadership, personnel responsible for Project RED implementation, hospital staff, and clinicians. Interview transcripts were coded and analyzed using a modified grounded theory approach and constant comparative analysis. Both internal and external contextual factors were identified that influenced hospitals' decisions on RED adaptation and implementation. These also impacted RED sustainability. External factors included: impending federal penalties for hospitals with high readmission rates targeting specific diagnoses, and access to external funding and technical support to help hospitals implement RED. Internal or organizational level contextual factors included: committed leadership prioritizing Project RED; RED adaptations; depth, accountability and influence of the implementation team; sustainability planning; and hospital culture. Only three of the five hospitals continued Project RED beyond the implementation period. The sustainability of RED in participating hospitals was only possible when hospitals approached RED implementation as a transformational process rather than a patient safety project, maintained a high level of fidelity to the RED protocol, and had leadership and an implementation team who embraced change and failure in the pursuit of better patient care and outcomes. Hospitals who were unsuccessful in implementing a sustainable RED process lacked all or most of these components in their approach.
Inverse Modeling of Texas NOx Emissions Using Space-Based and Ground-Based NO2 Observations
NASA Technical Reports Server (NTRS)
Tang, Wei; Cohan, D.; Lamsal, L. N.; Xiao, X.; Zhou, W.
2013-01-01
Inverse modeling of nitrogen oxide (NOx) emissions using satellite-based NO2 observations has become more prevalent in recent years, but has rarely been applied to regulatory modeling at regional scales. In this study, OMI satellite observations of NO2 column densities are used to conduct inverse modeling of NOx emission inventories for two Texas State Implementation Plan (SIP) modeling episodes. Addition of lightning, aircraft, and soil NOx emissions to the regulatory inventory narrowed but did not close the gap between modeled and satellite observed NO2 over rural regions. Satellitebased top-down emission inventories are created with the regional Comprehensive Air Quality Model with extensions (CAMx) using two techniques: the direct scaling method and discrete Kalman filter (DKF) with Decoupled Direct Method (DDM) sensitivity analysis. The simulations with satellite-inverted inventories are compared to the modeling results using the a priori inventory as well as an inventory created by a ground-level NO2 based DKF inversion. The DKF inversions yield conflicting results: the satellite based inversion scales up the a priori NOx emissions in most regions by factors of 1.02 to 1.84, leading to 3-55% increase in modeled NO2 column densities and 1-7 ppb increase in ground 8 h ozone concentrations, while the ground-based inversion indicates the a priori NOx emissions should be scaled by factors of 0.34 to 0.57 in each region. However, none of the inversions improve the model performance in simulating aircraft-observed NO2 or ground-level ozone (O3) concentrations.
Inverse modeling of Texas NOx emissions using space-based and ground-based NO2 observations
NASA Astrophysics Data System (ADS)
Tang, W.; Cohan, D. S.; Lamsal, L. N.; Xiao, X.; Zhou, W.
2013-11-01
Inverse modeling of nitrogen oxide (NOx) emissions using satellite-based NO2 observations has become more prevalent in recent years, but has rarely been applied to regulatory modeling at regional scales. In this study, OMI satellite observations of NO2 column densities are used to conduct inverse modeling of NOx emission inventories for two Texas State Implementation Plan (SIP) modeling episodes. Addition of lightning, aircraft, and soil NOx emissions to the regulatory inventory narrowed but did not close the gap between modeled and satellite-observed NO2 over rural regions. Satellite-based top-down emission inventories are created with the regional Comprehensive Air Quality Model with extensions (CAMx) using two techniques: the direct scaling method and discrete Kalman filter (DKF) with decoupled direct method (DDM) sensitivity analysis. The simulations with satellite-inverted inventories are compared to the modeling results using the a priori inventory as well as an inventory created by a ground-level NO2-based DKF inversion. The DKF inversions yield conflicting results: the satellite-based inversion scales up the a priori NOx emissions in most regions by factors of 1.02 to 1.84, leading to 3-55% increase in modeled NO2 column densities and 1-7 ppb increase in ground 8 h ozone concentrations, while the ground-based inversion indicates the a priori NOx emissions should be scaled by factors of 0.34 to 0.57 in each region. However, none of the inversions improve the model performance in simulating aircraft-observed NO2 or ground-level ozone (O3) concentrations.
Inverse modeling of Texas NOx emissions using space-based and ground-based NO2 observations
NASA Astrophysics Data System (ADS)
Tang, W.; Cohan, D.; Lamsal, L. N.; Xiao, X.; Zhou, W.
2013-07-01
Inverse modeling of nitrogen oxide (NOx) emissions using satellite-based NO2 observations has become more prevalent in recent years, but has rarely been applied to regulatory modeling at regional scales. In this study, OMI satellite observations of NO2 column densities are used to conduct inverse modeling of NOx emission inventories for two Texas State Implementation Plan (SIP) modeling episodes. Addition of lightning, aircraft, and soil NOx emissions to the regulatory inventory narrowed but did not close the gap between modeled and satellite observed NO2 over rural regions. Satellite-based top-down emission inventories are created with the regional Comprehensive Air Quality Model with extensions (CAMx) using two techniques: the direct scaling method and discrete Kalman filter (DKF) with Decoupled Direct Method (DDM) sensitivity analysis. The simulations with satellite-inverted inventories are compared to the modeling results using the a priori inventory as well as an inventory created by a ground-level NO2 based DKF inversion. The DKF inversions yield conflicting results: the satellite-based inversion scales up the a priori NOx emissions in most regions by factors of 1.02 to 1.84, leading to 3-55% increase in modeled NO2 column densities and 1-7 ppb increase in ground 8 h ozone concentrations, while the ground-based inversion indicates the a priori NOx emissions should be scaled by factors of 0.34 to 0.57 in each region. However, none of the inversions improve the model performance in simulating aircraft-observed NO2 or ground-level ozone (O3) concentrations.
Planning Targets for Phase II Watershed Implementation Plans
On August 1, 2011, EPA provided planning targets for nitrogen, phosphorus and sediment for the Phase II Watershed Implementation Plans (WIPs) of the Chesapeake Bay TMDL. This page provides the letters containing those planning targets.
Building robust conservation plans.
Visconti, Piero; Joppa, Lucas
2015-04-01
Systematic conservation planning optimizes trade-offs between biodiversity conservation and human activities by accounting for socioeconomic costs while aiming to achieve prescribed conservation objectives. However, the most cost-efficient conservation plan can be very dissimilar to any other plan achieving the set of conservation objectives. This is problematic under conditions of implementation uncertainty (e.g., if all or part of the plan becomes unattainable). We determined through simulations of parallel implementation of conservation plans and habitat loss the conditions under which optimal plans have limited chances of implementation and where implementation attempts would fail to meet objectives. We then devised a new, flexible method for identifying conservation priorities and scheduling conservation actions. This method entails generating a number of alternative plans, calculating the similarity in site composition among all plans, and selecting the plan with the highest density of neighboring plans in similarity space. We compared our method with the classic method that maximizes cost efficiency with synthetic and real data sets. When implementation was uncertain--a common reality--our method provided higher likelihood of achieving conservation targets. We found that χ, a measure of the shortfall in objectives achieved by a conservation plan if the plan could not be implemented entirely, was the main factor determining the relative performance of a flexibility enhanced approach to conservation prioritization. Our findings should help planning authorities prioritize conservation efforts in the face of uncertainty about future condition and availability of sites. © 2014 Society for Conservation Biology.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-03
... Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of Allowances Program AGENCY... to the Texas State Implementation Plan (SIP) that create and amend the Emissions Banking and Trading... hard copy at the Air Planning Section (6PD-L), Environmental Protection Agency, 1445 Ross Avenue, Suite...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-05
... Promulgation of Implementation Plans; Kentucky: Kentucky Portion of Cincinnati-Hamilton, Supplement Motor.... SUMMARY: EPA is proposing to approve a revision to the Kentucky State Implementation Plan (SIP), submitted... maintenance plan for the Kentucky portion of the Cincinnati-Hamilton, OH-KY-IN, maintenance area for the 1997...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-11
... Promulgation of Air Quality Implementation Plans; Ohio; 1997 8-Hour Ozone Maintenance Plan Revision; Motor... request by Ohio to revise the 1997 8-hour ozone maintenance air quality State Implementation Plan (SIP) to... area with budgets developed using EPA's Motor Vehicle Emissions Simulator (MOVES) emissions model. Ohio...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-19
...-9790-1] Approval and Promulgation of Air Quality Implementation Plans; Ohio; Cleveland-Akron-Lorain and Columbus 1997 8-Hour Ozone Maintenance Plan Revisions to Approved Motor Vehicle Emissions Budgets AGENCY... quality State Implementation Plans (SIPs) under the Clean Air Act to replace the previously approved motor...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-15
... Promulgation of Air Quality Implementation Plans; Ohio; Canton-Massillon 1997 8-Hour Ozone Maintenance Plan... the Canton-Massillon, Ohio 1997 8-hour ozone maintenance air quality State Implementation Plan (SIP... using EPA's Motor Vehicle Emissions Simulator (MOVES) emissions model. Ohio submitted the SIP revision...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-15
... Promulgation of Air Quality Implementation Plans; Ohio; Canton-Massillon 1997 8-Hour Ozone Maintenance Plan..., Ohio, 1997 8-hour ozone maintenance air quality State Implementation Plan (SIP) under the Clean Air Act... Motor Vehicle Emissions Simulator (MOVES) emissions model. Ohio submitted the SIP revision request to...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-22
... Promulgation of Air Quality Implementation Plans; Rhode Island; Regional Haze AGENCY: Environmental Protection... Implementation Plan (SIP) that addresses regional haze for the first planning period from 2008 through 2018. The... geographic area (also referred to as the ``regional haze program''). DATES: Effective Date: This rule is...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-20
... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0131, FRL-9317-9] Approval and Promulgation of Air Quality Implementation Plans; State of California; Regional Haze State Implementation Plan and Interstate Transport Plan; Interference With Visibility Requirement Correction In rule document...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-15
... Promulgation of Air Quality Implementation Plans; West Virginia; Revised Motor Vehicle Emission Budgets for the... Implementation Plan (SIP) revision submitted by the State of West Virginia for the purpose of amending the 8-hour ozone maintenance plan for the Charleston, Huntington, Parkersburg, Weirton, and Wheeling 8-hour ozone...
This report discusses potential ground water pollution from geothermal resource development, conversion, and waste disposal, and proposes guidelines for developing a ground water monitoring plan for any such development. Geothermal processes, borehole logging, and injection well ...
Improvement of a method for positioning of pithead by considering motion of the surface water
NASA Astrophysics Data System (ADS)
Yi, H.; Lee, D. K.
2016-12-01
Underground mining has weakness compared with open pit mining in aspects of efficiency, economy and working environment. However, the method has applied for the development of a deep orebody. Development plan is established when the economic valuation and technical analysis of the deposits is completed through exploration of mineral resources. Development is a process to open a passage from the ground surface to the orebody as one of the steps of mining process. In the planning, there are details such as pithead positioning, mining method selection, and shaft design, etc. Among these, pithead positioning is implemented by considering infrastructures, watershed, geology, and economy. In this study, we propose a method to consider the motion of the surface waters in order to improve the existing pithead positioning techniques. The method contemplates the terrain around the mine and makes the surface water flow information. Then, the drainage treatment cost for each candidate location of pithead is suggested. This study covers the concept and design of the scheme.
NASA Technical Reports Server (NTRS)
Sutliff, Thomas J.; Otero, Angel M.; Urban, David L.
2002-01-01
The Physical Sciences Research Program of NASA sponsors a broad suite of peer-reviewed research investigating fundamental combustion phenomena and applied combustion research topics. This research is performed through both ground-based and on-orbit research capabilities. The International Space Station (ISS) and two facilities, the Combustion Integrated Rack and the Microgravity Science Glovebox, are key elements in the execution of microgravity combustion flight research planned for the foreseeable future. This paper reviews the Microgravity Combustion Science research planned for the International Space Station implemented from 2003 through 2012. Examples of selected research topics, expected outcomes, and potential benefits will be provided. This paper also summarizes a multi-user hardware development approach, recapping the progress made in preparing these research hardware systems. Within the description of this approach, an operational strategy is presented that illustrates how utilization of constrained ISS resources may be maximized dynamically to increase science through design decisions made during hardware development.
Computer simulation and implementation of defected ground structure on a microstrip antenna
NASA Astrophysics Data System (ADS)
Adrian, H.; Rambe, A. H.; Suherman
2018-03-01
Defected Ground Structure (DGS) is a method reducing etching area on antenna ground to form desirable antenna’s ground field. This paper reports the method impact on microstrip antennas working on 1800 and 2400 MHz. These frequencies are important as many radio network applications such mobile phones and wireless devices working on these channels. The assessments were performed by simulating and fabricating the evaluated antennas. Both simulation data and implementation measurements show that DGS successfully improves antenna performances by increasing bandwidth up to 19%, reducing return loss up to 109% and increasing gain up to 33%.
Autonomous Mission Operations Roadmap
NASA Technical Reports Server (NTRS)
Frank, Jeremy David
2014-01-01
As light time delays increase, the number of such situations in which crew autonomy is the best way to conduct the mission is expected to increase. However, there are significant open questions regarding which functions to allocate to ground and crew as the time delays increase. In situations where the ideal solution is to allocate responsibility to the crew and the vehicle, a second question arises: should the activity be the responsibility of the crew or an automated vehicle function? More specifically, we must answer the following questions: What aspects of mission operation responsibilities (Plan, Train, Fly) should be allocated to ground based or vehicle based planning, monitoring, and control in the presence of significant light-time delay between the vehicle and the Earth?How should the allocated ground based planning, monitoring, and control be distributed across the flight control team and ground system automation? How should the allocated vehicle based planning, monitoring, and control be distributed between the flight crew and onboard system automation?When during the mission should responsibility shift from flight control team to crew or from crew to vehicle, and what should the process of shifting responsibility be as the mission progresses? NASA is developing a roadmap of capabilities for Autonomous Mission Operations for human spaceflight. This presentation will describe the current state of development of this roadmap, with specific attention to in-space inspection tasks that crews might perform with minimum assistance from the ground.
NASA Astrophysics Data System (ADS)
Buxbaum, T. M.; Thoman, R.; Romanovsky, V. E.
2015-12-01
Permafrost is ground at or below freezing for at least two consecutive years. It currently occupies 80% of Alaska. Permafrost temperature and active layer thickness (ALT) are key climatic variables for monitoring permafrost conditions. Active layer thickness is the depth that the top layer of ground above the permafrost thaws each summer season and permafrost temperature is the temperature of the frozen permafrost under this active layer. Knowing permafrost conditions is key for those individuals working and living in Alaska and the Arctic. The results of climate models predict vast changes and potential permafrost degradation across Alaska and the Arctic. NOAA is working to implement its 2014 Arctic Action Plan and permafrost forecasting is a missing piece of this plan. The Alaska Center for Climate Assessment and Policy (ACCAP), using our webinar software and our diverse network of statewide stakeholder contacts, hosted a listening session to bring together a select group of key stakeholders. During this listening session the National Weather Service (NWS) and key permafrost researchers explained what is possible in the realm of permafrost forecasting and participants had the opportunity to discuss and share with the group (NWS, researchers, other stakeholders) what is needed for usable permafrost forecasting. This listening session aimed to answer the questions: Is permafrost forecasting needed? If so, what spatial scale is needed by stakeholders? What temporal scales do stakeholders need/want? Are there key times (winter, fall freeze-up, etc.) or locations (North Slope, key oil development areas, etc.) where forecasting would be most applicable and useful? Are there other considerations or priority needs we haven't thought of regarding permafrost forecasting? This presentation will present the results of that listening session.
Code of Federal Regulations, 2012 CFR
2012-07-01
... OIL REMOVAL CONTINGENCY PLANS § 109.5 Development and implementation criteria for State, local and regional oil removal contingency plans. Criteria for the development and implementation of State, local and... 40 Protection of Environment 23 2012-07-01 2012-07-01 false Development and implementation...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-25
... controls are enforced through the associated SIP rules or Federal Implementation Plans (FIPs). Any purchase... Promulgation of Implementation Plans; Georgia 110(a)(1) and (2) Infrastructure Requirements for the 1997 and... Agency (EPA). ACTION: Final rule. SUMMARY: EPA is taking final action to approve the State Implementation...
Consumer Outcomes After Implementing CommonGround as an Approach to Shared Decision Making.
Salyers, Michelle P; Fukui, Sadaaki; Bonfils, Kelsey A; Firmin, Ruth L; Luther, Lauren; Goscha, Rick; Rapp, Charles A; Holter, Mark C
2017-03-01
The authors examined consumer outcomes before and after implementing CommonGround, a computer-based shared decision-making program. Consumers with severe mental illness (N=167) were interviewed prior to implementation and 12 and 18 months later to assess changes in active treatment involvement, symptoms, and recovery-related attitudes. Providers also rated consumers on level of treatment involvement. Most consumers used CommonGround at least once (67%), but few used the program regularly. Mixed-effects regression analyses showed improvement in self-reported symptoms and recovery attitudes. Self-reported treatment involvement did not change; however, for a subset of consumers with the same providers over time (N=83), the providers rated consumers as more active in treatment. This study adds to the growing literature on tools to support shared decision making, showing the potential benefits of CommonGround for improving recovery outcomes. More work is needed to better engage consumers in CommonGround and to test the approach with more rigorous methods.
Contamination control plan for prelaunch operations
NASA Technical Reports Server (NTRS)
Austin, J. D.
1983-01-01
A unified, systematic plan is presented for contamination control for space flight systems. Allowable contaminant quantities, or contamination budgets, are determined based on system performance margins and system-level allowable degradations. These contamination budgets are compared to contamination rates in ground environments to establish the controls required in each ground environment. The use of feedback from contamination monitoring and some contamination control procedures are discussed.
Gill, Simone V; Hung, Ya-Ching
2014-01-01
Little is known about how obesity relates to motor planning and skills during functional tasks. We collected 3-D kinematics and kinetics as normal weight (n=10) and overweight/obese (n=12) children walked on flat ground and as they crossed low, medium, and high obstacles. We investigated if motor planning and motor skill impairments were evident during obstacle crossing. Baseline conditions showed no group differences (all ps>.05). Increased toe clearance was found on low obstacles (p=.01) for the overweight/obese group and on high obstacles (p=.01) for the normal weight group. With the crossing leg, the overweight/obese group had larger hip abduction angles (p=.01) and medial ground reaction forces (p=.006) on high obstacles and high anterior ground reaction forces on low obstacles (p=.001). With the trailing leg, overweight/obese children had higher vertical ground reaction forces on high obstacles (p=.005) and higher knee angles (p=.01) and anterior acceleration in the center of mass (p=.01) on low obstacles. These findings suggest that differences in motor planning and skills in overweight/obese children may be more apparent during functional activities. Copyright © 2013 Elsevier Ltd. All rights reserved.
The NASA Materials Science Research Program: It's New Strategic Goals and Opportunities
NASA Technical Reports Server (NTRS)
Schlagheck, Ronald A.; Stagg, Elizabeth
2004-01-01
In the past year, the NASA s Office of Biological and Physical Research (OBPR) has formulated a long term plan to perform strategical and fundamental research bringing together physics, chemistry, biology, and engineering to solve problems needed for current and future agency mission goals. Materials Science is one of basic disciplines within the Enterprise s Division of Physical Sciences Research. The Materials Science Program participates to utilize effective use of International Space Station (ISS) and various world class ground laboratory facilities to solve new scientific and technology questions and transfer these results for public and agency benefits. The program has recently targeted new investigative research in strategic areas necessary to expand NASA knowledge base for exploration of the universe and some of these experiments will need access to the microgravity of space. The program is implementing a wide variety of traditional ground and flight based research related types of fundamental science related to materials crystallization, fundamental processing, and properties characterization in order to obtain basic understanding of various phenomena effects and relationships to the structures, processing, and properties of materials. , In addition new initiatives in radiation protection, materials for propulsion and In-space fabrication and repair focus on research helping the agency solve problems needed for future transportation into the solar system. A summary of the types and sources for this research is presented including those experiments planned for a low gravity environment. Areas to help expand the science basis for NASA future missions are described. An overview of the program is given including the scope of the current and future NASA Research Announcements with emphasis on new materials science initiatives. A description of the planned flight experiments to be conducted on the International Space Station program along with the planned facility class Materials Science Research Rack (MSRR) and Microgravity Glovebox (MSG) type investigations. Some initial results from the first three materials experiments are given.
Global civil aviation black carbon emissions.
Stettler, Marc E J; Boies, Adam M; Petzold, Andreas; Barrett, Steven R H
2013-09-17
Aircraft black carbon (BC) emissions contribute to climate forcing, but few estimates of BC emitted by aircraft at cruise exist. For the majority of aircraft engines the only BC-related measurement available is smoke number (SN)-a filter based optical method designed to measure near-ground plume visibility, not mass. While the first order approximation (FOA3) technique has been developed to estimate BC mass emissions normalized by fuel burn [EI(BC)] from SN, it is shown that it underestimates EI(BC) by >90% in 35% of directly measured cases (R(2) = -0.10). As there are no plans to measure BC emissions from all existing certified engines-which will be in service for several decades-it is necessary to estimate EI(BC) for existing aircraft on the ground and at cruise. An alternative method, called FOX, that is independent of the SN is developed to estimate BC emissions. Estimates of EI(BC) at ground level are significantly improved (R(2) = 0.68), whereas estimates at cruise are within 30% of measurements. Implementing this approach for global civil aviation estimated aircraft BC emissions are revised upward by a factor of ~3. Direct radiative forcing (RF) due to aviation BC emissions is estimated to be ~9.5 mW/m(2), equivalent to ~1/3 of the current RF due to aviation CO2 emissions.
Detection of ground motions using high-rate GPS time-series
NASA Astrophysics Data System (ADS)
Psimoulis, Panos A.; Houlié, Nicolas; Habboub, Mohammed; Michel, Clotaire; Rothacher, Markus
2018-05-01
Monitoring surface deformation in real-time help at planning and protecting infrastructures and populations, manage sensitive production (i.e. SEVESO-type) and mitigate long-term consequences of modifications implemented. We present RT-SHAKE, an algorithm developed to detect ground motions associated with landslides, sub-surface collapses, subsidences, earthquakes or rock falls. RT-SHAKE detects first transient changes in individual GPS time series before investigating for spatial correlation(s) of observations made at neighbouring GPS sites and eventually issue a motion warning. In order to assess our algorithm on fast (seconds to minute), large (from 1 cm to meters) and spatially consistent surface motions, we use the 1 Hz GEONET GNSS network data of the Tohoku-Oki MW9.0 2011 as a test scenario. We show the delay of detection of seismic wave arrival by GPS records is of ˜10 seconds with respect to an identical analysis based on strong-motion data and this time delay depends on the level of the time-variable noise. Nevertheless, based on the analysis of the GPS network noise level and ground motion stochastic model, we show that RT-SHAKE can narrow the range of earthquake magnitude, by setting a lower threshold of detected earthquakes to MW6.5-7, if associated with a real-time automatic earthquake location system.
40 CFR 49.10050 - Federally-promulgated regulations and Federal implementation plans.
Code of Federal Regulations, 2010 CFR
2010-07-01
...-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10050 Federally... part of the implementation plan for the Reservation of the Cow Creek Band of Umpqua Indians: (a...
Colloca, Francesco; Garofalo, Germana; Bitetto, Isabella; Facchini, Maria Teresa; Grati, Fabio; Martiradonna, Angela; Mastrantonio, Gianluca; Nikolioudakis, Nikolaos; Ordinas, Francesc; Scarcella, Giuseppe; Tserpes, George; Tugores, M Pilar; Valavanis, Vasilis; Carlucci, Roberto; Fiorentino, Fabio; Follesa, Maria C; Iglesias, Magdalena; Knittweis, Leyla; Lefkaditou, Eugenia; Lembo, Giuseppe; Manfredi, Chiara; Massutí, Enric; Pace, Marie Louise; Papadopoulou, Nadia; Sartor, Paolo; Smith, Christopher J; Spedicato, Maria Teresa
2015-01-01
The identification of nursery grounds and other essential fish habitats of exploited stocks is a key requirement for the development of spatial conservation planning aimed at reducing the adverse impact of fishing on the exploited populations and ecosystems. The reduction in juvenile mortality is particularly relevant in the Mediterranean and is considered as one of the main prerequisites for the future sustainability of trawl fisheries. The distribution of nursery areas of 11 important commercial species of demersal fish and shellfish was analysed in the European Union Mediterranean waters using time series of bottom trawl survey data with the aim of identifying the most persistent recruitment areas. A high interspecific spatial overlap between nursery areas was mainly found along the shelf break of many different sectors of the Northern Mediterranean indicating a high potential for the implementation of conservation measures. Overlap of the nursery grounds with existing spatial fisheries management measures and trawl fisheries restricted areas was also investigated. Spatial analyses revealed considerable variation depending on species and associated habitat/depth preferences with increased protection seen in coastal nurseries and minimal protection seen for deeper nurseries (e.g. Parapenaeus longirostris 6%). This is partly attributed to existing environmental policy instruments (e.g. Habitats Directive and Mediterranean Regulation EC 1967/2006) aiming at minimising impacts on coastal priority habitats such as seagrass, coralligenous and maerl beds. The new knowledge on the distribution and persistence of demersal nurseries provided in this study can support the application of spatial conservation measures, such as the designation of no-take Marine Protected Areas in EU Mediterranean waters and their inclusion in a conservation network. The establishment of no-take zones will be consistent with the objectives of the Common Fisheries Policy applying the ecosystem approach to fisheries management and with the requirements of the Marine Strategy Framework Directive to maintain or achieve seafloor integrity and good environmental status.
Colloca, Francesco; Garofalo, Germana; Bitetto, Isabella; Facchini, Maria Teresa; Grati, Fabio; Martiradonna, Angela; Mastrantonio, Gianluca; Nikolioudakis, Nikolaos; Ordinas, Francesc; Scarcella, Giuseppe; Tserpes, George; Tugores, M. Pilar; Valavanis, Vasilis; Carlucci, Roberto; Fiorentino, Fabio; Follesa, Maria C.; Iglesias, Magdalena; Knittweis, Leyla; Lefkaditou, Eugenia; Lembo, Giuseppe; Manfredi, Chiara; Massutí, Enric; Pace, Marie Louise; Papadopoulou, Nadia; Sartor, Paolo; Smith, Christopher J.; Spedicato, Maria Teresa
2015-01-01
The identification of nursery grounds and other essential fish habitats of exploited stocks is a key requirement for the development of spatial conservation planning aimed at reducing the adverse impact of fishing on the exploited populations and ecosystems. The reduction in juvenile mortality is particularly relevant in the Mediterranean and is considered as one of the main prerequisites for the future sustainability of trawl fisheries. The distribution of nursery areas of 11 important commercial species of demersal fish and shellfish was analysed in the European Union Mediterranean waters using time series of bottom trawl survey data with the aim of identifying the most persistent recruitment areas. A high interspecific spatial overlap between nursery areas was mainly found along the shelf break of many different sectors of the Northern Mediterranean indicating a high potential for the implementation of conservation measures. Overlap of the nursery grounds with existing spatial fisheries management measures and trawl fisheries restricted areas was also investigated. Spatial analyses revealed considerable variation depending on species and associated habitat/depth preferences with increased protection seen in coastal nurseries and minimal protection seen for deeper nurseries (e.g. Parapenaeus longirostris 6%). This is partly attributed to existing environmental policy instruments (e.g. Habitats Directive and Mediterranean Regulation EC 1967/2006) aiming at minimising impacts on coastal priority habitats such as seagrass, coralligenous and maerl beds. The new knowledge on the distribution and persistence of demersal nurseries provided in this study can support the application of spatial conservation measures, such as the designation of no-take Marine Protected Areas in EU Mediterranean waters and their inclusion in a conservation network. The establishment of no-take zones will be consistent with the objectives of the Common Fisheries Policy applying the ecosystem approach to fisheries management and with the requirements of the Marine Strategy Framework Directive to maintain or achieve seafloor integrity and good environmental status. PMID:25785737
40 CFR 258.58 - Implementation of the corrective action program.
Code of Federal Regulations, 2013 CFR
2013-07-01
... (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective...) Establish and implement a corrective action ground-water monitoring program that: (i) At a minimum, meet the requirements of an assessment monitoring program under § 258.55; (ii) Indicate the effectiveness of the...
40 CFR 258.58 - Implementation of the corrective action program.
Code of Federal Regulations, 2012 CFR
2012-07-01
... WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective Action § 258... implement a corrective action ground-water monitoring program that: (i) At a minimum, meet the requirements of an assessment monitoring program under § 258.55; (ii) Indicate the effectiveness of the corrective...
40 CFR 258.58 - Implementation of the corrective action program.
Code of Federal Regulations, 2011 CFR
2011-07-01
... (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective...) Establish and implement a corrective action ground-water monitoring program that: (i) At a minimum, meet the requirements of an assessment monitoring program under § 258.55; (ii) Indicate the effectiveness of the...
40 CFR 258.58 - Implementation of the corrective action program.
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) SOLID WASTES CRITERIA FOR MUNICIPAL SOLID WASTE LANDFILLS Ground-Water Monitoring and Corrective...) Establish and implement a corrective action ground-water monitoring program that: (i) At a minimum, meet the requirements of an assessment monitoring program under § 258.55; (ii) Indicate the effectiveness of the...
40 CFR 257.28 - Implementation of the corrective action program.
Code of Federal Regulations, 2012 CFR
2012-07-01
...-Hazardous Waste Disposal Units Ground-Water Monitoring and Corrective Action § 257.28 Implementation of the... ground-water monitoring program that: (i) At a minimum, meets the requirements of an assessment monitoring program under § 257.25; (ii) Indicates the effectiveness of the corrective action remedy; and (iii...
Planning for strategic change? A participative planning approach for community hospitals.
MacDonald, S K; Beange, J E; Blachford, P C
1992-01-01
Strategic planning is becoming to hospitals what business case analysis is to private corporations. In fact, this type of planning is becoming essential for the professional management of Ontario hospitals. The participative strategic planning process at Toronto East General Hospital (TEGH) is an example of how a professionally structured and implemented strategic planning process can be successfully developed and implemented in a community hospital. In this article, the environmental factors driving planning are reviewed and the critical success factors for the development and implementation of a strategic plan are examined in the context of TEGH's experience.
14 CFR 61.213 - Eligibility requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
...) AIRMEN CERTIFICATION: PILOTS, FLIGHT INSTRUCTORS, AND GROUND INSTRUCTORS Ground Instructors § 61.213...) Student evaluation and testing; (iv) Course development; (v) Lesson planning; and (vi) Classroom training...) Holds a ground instructor certificate or flight instructor certificate issued under this part; (2) Holds...
14 CFR 61.213 - Eligibility requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
...) AIRMEN CERTIFICATION: PILOTS, FLIGHT INSTRUCTORS, AND GROUND INSTRUCTORS Ground Instructors § 61.213...) Student evaluation and testing; (iv) Course development; (v) Lesson planning; and (vi) Classroom training...) Holds a ground instructor certificate or flight instructor certificate issued under this part; (2) Holds...
14 CFR 61.213 - Eligibility requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
...) AIRMEN CERTIFICATION: PILOTS, FLIGHT INSTRUCTORS, AND GROUND INSTRUCTORS Ground Instructors § 61.213...) Student evaluation and testing; (iv) Course development; (v) Lesson planning; and (vi) Classroom training...) Holds a ground instructor certificate or flight instructor certificate issued under this part; (2) Holds...
Reynolds, Heidi W; Sutherland, Elizabeth G
2013-05-06
Because of the current emphasis and enthusiasm focused on integration of health systems, there is a risk of piling resources into integrated strategies without the necessary systems in place to monitor their progress adequately or to measure impact, and to learn from these efforts. The rush to intervene without adequate monitoring and evaluation will continue to result in a weak evidence base for decision making and resource allocation. Program planning and implementation are inextricability linked to monitoring and evaluation. Country level guidance is needed to identify country-specific integrated strategies, thereby increasing country ownership. This paper focuses on integrated health services but takes into account how health services are influenced by the health system, managed by programs, and made up of interventions. We apply the principles in existing comprehensive monitoring and evaluation (M&E) frameworks in order to outline a systematic approach to the M&E of integration for the country level. The approach is grounded by first defining the country-specific health challenges that integration is intended to affect. Priority points of contact for care can directly influence health, and essential packages of integration for all major client presentations need to be defined. Logic models are necessary to outline the plausible causal pathways and define the inputs, roles and responsibilities, indicators, and data sources across the health system. Finally, we recommend improvements to the health information system and in data use to ensure that data are available to inform decisions, because changes in the M&E function to make it more integrated will also facilitate integration in the service delivery, planning, and governance components. This approach described in the paper is the ideal, but its application at the country level can help reveal gaps and guide decisions related to what health services to prioritize for integration, help plan for how to strengthen systems to support health services, and ultimately establish an evidence base to inform investments in health care. More experience is needed to understand if the approach is feasible; similarly, more emphasis is needed on documenting the process of designing and implemented integrated interventions at the national level.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-11
... Promulgation of Air Quality Implementation Plans; Ohio; Lima 1997 8-Hour Ozone Maintenance Plan Revision; Motor... 1997 8-hour ozone maintenance air quality State Implementation Plan (SIP) to replace the previously... Simulator (MOVES) emissions model. Ohio submitted the SIP revision request to EPA on January 11, 2013. DATES...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-11
... Promulgation of Air Quality Implementation Plans; Ohio; 1997 8-Hour Ozone Maintenance Plan Revision; Motor... request by Ohio to revise the 1997 8-hour ozone maintenance air quality State Implementation Plan (SIP...) emissions model. Ohio submitted the SIP revision request to EPA on December 7, 2012. DATES: Comments must be...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-11
... Promulgation of Air Quality Implementation Plans; Ohio; Lima 1997 8-Hour Ozone Maintenance Plan Revision to... Lima, Ohio 1997 8-hour ozone maintenance air quality State Implementation Plan (SIP) to replace motor... (MOVES) emissions model. Ohio submitted the SIP revision request to EPA on January 11, 2013. DATES: This...
Groundwater monitoring well assessment final work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-10-01
Jacobs Engineering Group Inc. (JEG) has been contracted by Environmental Management Operations (EMO) to develop and implement a Groundwater Monitoring Well Assessment Plan for Canal Creek in the Edgewood Area of Aberdeen Proving Ground (APG-EA). The task will be performed under the provisions of Master Agreement 071914-A-D7, Task Order 142133. The project consists of assessing the condition of existing groundwater monitoring wells in the Canal Creek Area prior to a groundwater sampling program. The following Work Plan describes the technical approach that will be used to conduct field work for the project. Integrity of some monitoring wells installed at APG-EAmore » has come into question because of problems with well completions that were detected in wells at the O-field Study Area during a recent sampling event. Because of this, EPA and APG-DSHE officials have requested a well integrity assessment for a percentage of 168 monitoring wells installed at the Canal Creek Study Area(14 by USATHAMA, 152 by USGS). Results of the well assessment will be used to determine if these wells were completed in a fashion that minimizes the potential for either cross-contamination of aquifers or leakage of water from the surface into the well.« less
Automatic Scheduling and Planning (ASAP) in future ground control systems
NASA Technical Reports Server (NTRS)
Matlin, Sam
1988-01-01
This report describes two complementary approaches to the problem of space mission planning and scheduling. The first is an Expert System or Knowledge-Based System for automatically resolving most of the activity conflicts in a candidate plan. The second is an Interactive Graphics Decision Aid to assist the operator in manually resolving the residual conflicts which are beyond the scope of the Expert System. The two system designs are consistent with future ground control station activity requirements, support activity timing constraints, resource limits and activity priority guidelines.
Is EIA part of the wind power planning problem?
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smart, Duncan Ewan; Stojanovic, Timothy A., E-mail: tas21@st-andrews.ac.uk; Warren, Charles R.
2014-11-15
This research evaluates the importance and effectiveness of Environmental Impact Assessment (EIA) within wind farm planning debates, drawing on insights from case studies in Scotland. Despite general public support for renewable energy on the grounds that it is needed to tackle climate change and implement sustainable development, many proposed wind farms encounter significant resistance. The importance of planning issues and (EIA) processes has arguably been overlooked within recent wind farm social acceptability discourse. Through semi-structured interviews with key stakeholders and textual analysis of EIA documents, the characteristics of EIA are assessed in terms of its perceived purpose and performance. Themore » data show that whilst respondents perceive EIA to be important, they express concerns about bias and about the inability of EIA to address climate change and wind farm decommissioning issues adequately. Furthermore, the research identifies key issues which impede the effectiveness of EIA, and reveals differences between theoretical and practical framings of EIA. The paper questions the assumption that EIA is a universally applicable tool, and argues that its effectiveness should be analysed in the context of specific development sectors. The article concludes by reviewing whether the recently amended EIA Directive (2014/52/EU) could resolve identified problems within national EIA practice. - Highlights: • Evaluation of EIA for onshore wind farm planning in Scotland. • EIA is important for multiple aspects of onshore wind farm planning. • Multiple substantive deficiencies of relevance to wind farm planning exist in EIA. • Further research into EIA effectiveness for specific development types is required. • Directive 2014/52/EU may improve EIA effectiveness within wind farm planning.« less
Factors affecting strategic plan implementation using interpretive structural modeling (ISM).
Bahadori, Mohammadkarim; Teymourzadeh, Ehsan; Tajik, Hamidreza; Ravangard, Ramin; Raadabadi, Mehdi; Hosseini, Seyed Mojtaba
2018-06-11
Purpose Strategic planning is the best tool for managers seeking an informed presence and participation in the market without surrendering to changes. Strategic planning enables managers to achieve their organizational goals and objectives. Hospital goals, such as improving service quality and increasing patient satisfaction cannot be achieved if agreed strategies are not implemented. The purpose of this paper is to investigate the factors affecting strategic plan implementation in one teaching hospital using interpretive structural modeling (ISM). Design/methodology/approach The authors used a descriptive study involving experts and senior managers; 16 were selected as the study sample using a purposive sampling method. Data were collected using a questionnaire designed and prepared based on previous studies. Data were analyzed using ISM. Findings Five main factors affected strategic plan implementation. Although all five variables and factors are top level, "senior manager awareness and participation in the strategic planning process" and "creating and maintaining team participation in the strategic planning process" had maximum drive power. "Organizational structure effects on the strategic planning process" and "Organizational culture effects on the strategic planning process" had maximum dependence power. Practical implications Identifying factors affecting strategic plan implementation is a basis for healthcare quality improvement by analyzing the relationship among factors and overcoming the barriers. Originality/value The authors used ISM to analyze the relationship between factors affecting strategic plan implementation.