Science.gov

Sample records for implementation plans california

  1. 75 FR 69910 - Revisions to the California State Implementation Plan, California Air Resources Board-Consumer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, California Air Resources...: EPA is proposing to approve revisions to the California Air Resources Board portion of the California... Street, San Francisco, California. While all documents in the docket are listed in the index,...

  2. 75 FR 3680 - Revisions to the California State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-22

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan AGENCY: Environmental... Implementation Plan (SIP). These revisions concern oxides of nitrogen (NO X ) from residential water heaters. We... 1990 (CAA or the Act). We are taking comments on this proposal and plan to follow with a final...

  3. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-28

    ... From the Federal Register Online via the Government Publishing Office ] ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA...

  4. 77 FR 65151 - Finding of Substantial Inadequacy of Implementation Plan; Call for California State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-25

    ... to find that the California State Implementation Plan (SIP) for the Los Angeles-South Coast Air Basin... the Clean Air Act, EPA proposed to find that the California State Implementation Plan (SIP) for...

  5. 75 FR 45082 - Revisions to the California State Implementation Plan, Santa Barbara County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-02

    ... Air Pollution Control District (SBCAPCD) portion of the California State Implementation Plan (SIP... Environmental protection, Air pollution control, Intergovernmental relations, Nitrogen dioxide, Ozone, Reporting... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Santa Barbara County...

  6. 77 FR 24441 - Approval and Promulgation of Implementation Plans; California; Revisions to the California State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-24

    ... from Pesticides: Analysis of Alternatives for Field Fumigation Methods, June 28, 2011. Field fumigation... California State Implementation Plan Pesticide Element AGENCY: U.S. Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA proposes to approve several revisions to the Pesticide Element of...

  7. 78 FR 10589 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-14

    ... AGENCY 40 CFR Part 52 Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District; Stationary Source Permits AGENCY: Environmental Protection Agency... by California as a revision to the Sacramento Metropolitan Air Quality Management District (SMAQMD...

  8. 78 FR 53270 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... AGENCY 40 CFR Part 52 Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District; Stationary Source Permits AGENCY: Environmental Protection Agency... permitting rules submitted by California as a revision to the Sacramento Metropolitan Air Quality...

  9. 77 FR 58352 - Revisions to the California State Implementation Plan, San Diego County, Antelope Valley and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, San Diego County, Antelope... Antelope Valley Air Quality Management District (AVAQMD) portions of the California State...

  10. 76 FR 54384 - California State Implementation Plan, South Coast Air Quality Management District; Withdrawal of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-01

    ... AGENCY 40 CFR Part 52 California State Implementation Plan, South Coast Air Quality Management District... to the California State Implementation Plan (SIP). This revision concerned South Coast Air Quality Management District (SCAQMD) Rule 1143, Consumer Paint Thinner & Multi-Purpose Solvents and Rule 1144,...

  11. 76 FR 67396 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution... proposing to approve revisions to the Placer County Air Pollution Control District (PCAPCD) and Sacramento Metro Air Quality Management District (SMAQMD) portions of the California State Implementation Plan...

  12. 77 FR 65133 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-25

    ... Identification of plan. * * * * * (c) * * * (379) * * * (i) * * * (E) Mojave Desert Air Quality Management... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA...

  13. 76 FR 31242 - Revisions to the California State Implementation Plan, Santa Barbara County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ... Environmental protection, Air pollution control, Incorporation by reference, Intergovernmental relations... Identification of plan. * * * * * (c) * * * (359) * * * (i) * * * (E) Santa Barbara County Air Pollution Control... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Santa Barbara County...

  14. 77 FR 12651 - Approval of Air Quality Implementation Plans; California; San Joaquin Valley; Attainment Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ...EPA is approving state implementation plan (SIP) revisions submitted by California to provide for attainment of the 1997 8-hour ozone national ambient air quality standards in the San Joaquin Valley (SJV). These SIP revisions are the 2007 Ozone Plan (revised 2008 and 2011) and SJV-related portions of the 2007 State Strategy (revised 2009 and 2011). EPA is approving the base year emissions......

  15. 78 FR 18849 - Disapproval of Implementation Plan Revisions; State of California; South Coast VMT Emissions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-28

    ... AGENCY 40 CFR Part 52 Disapproval of Implementation Plan Revisions; State of California; South Coast VMT... submitted by the State of California to meet the vehicle-miles-traveled emissions offset requirement under... revisions meeting the applicable requirements must be submitted by the State of California and approved...

  16. 78 FR 21540 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental... revisions to the Butte County Air Quality Management District (BCAQMD) and Sacramento Metropolitan...

  17. 75 FR 40762 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-14

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District and South Coast Air Quality Management District AGENCY: Environmental... Sacramento Metropolitan Air Quality Management District (SMAQMD) and South Coast Air Quality...

  18. 78 FR 21582 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental... County Air Quality Management District (BCAQMD) and Sacramento Metropolitan Air Quality...

  19. North Coast Unified Air Quality Management District, California; Final Limited Federal Implementation Plan

    EPA Pesticide Factsheets

    EPA is finalizing a limited Federal Implementation Plan (FIP) under the Clean Air Act (CAA or Act) to apply to the North Coast Unified Air Quality Management District (North Coast Unified AQMD or District) in California.

  20. 77 FR 73005 - Revisions to the California State Implementation Plan, Imperial County, Placer County, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-07

    ... County, and Ventura County Air Pollution Control Districts AGENCY: Environmental Protection Agency (EPA... Pollution Control District (ICAPCD), Placer County Air Pollution Control District (PCAPCD) and Ventura County Air Pollution Control District (PCAPCD) portions of the California State Implementation Plan...

  1. 77 FR 47536 - Revisions to the California State Implementation Plan, Mojave Desert, Northern Sierra, Sacramento...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert, Northern... to the Mojave Desert Air Quality Management District (MDAQMD), Northern Sierra ] Air Quality... Desert Air Quality Management District. (1) Rule 1116, ``Automotive Refinishing Operations,'' amended...

  2. 75 FR 24406 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-05

    ... Control District, Sacramento Metropolitan Air Quality Management District, San Joaquin Valley Unified Air Pollution Control District, and South Coast Air Quality Management District AGENCY: Environmental Protection... Coast Air Quality Management District (SCAQMD) portions of the California State Implementation Plan...

  3. 76 FR 71886 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-21

    ... Control District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental... Quality Management District (SMAQMD) portions of the California State Implementation Plan (SIP). These... Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); Does...

  4. 77 FR 63743 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-17

    ... Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the Sacramento Metropolitan Air Quality Management District (SMAQMD) portion of the California State Implementation Plan (SIP). These...

  5. 76 FR 41745 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule... Valley Unified Air Pollution Control District portion of the California State Implementation Plan (SIP... Valley Unified Air Pollution Control District (SJVUAPCD) Rule 4682, Polystyrene, Polyethylene,...

  6. 77 FR 26475 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... the Antelope Valley Air Quality Management District (AVAQMD), Eastern Kern Air Pollution...

  7. 78 FR 21581 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... the Antelope Valley Air Quality Management District (AVAQMD), Monterey Bay Unified Air...

  8. 76 FR 26192 - Revisions to the California State Implementation Plan, Northern Sonoma County Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-06

    ... Pollution Control District (NSCAPCD) and Mendocino County Air Quality Management District (MCAQMD) AGENCY... approve revisions to the Northern Sonoma County Air Pollution Control District (NSCAPCD) and Mendocino County Air Quality Management District (MCAQMD) portions of the California State Implementation Plan...

  9. 76 FR 26224 - Revisions to the California State Implementation Plan, Northern Sonoma County Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-06

    ... Pollution Control District (NSCAPCD) and Mendocino County Air Quality Management District (MCAQMD) AGENCY... the Northern Sonoma County Air Pollution Control District (NSCAPCD) and Mendocino County Air Quality Management District (MCAQMD) portions of the California State Implementation Plan (SIP). Both districts...

  10. 77 FR 32493 - Approval of Air Quality Implementation Plans; California; San Joaquin Valley Unified Air...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... AGENCY 40 CFR Part 52 Approval of Air Quality Implementation Plans; California; San Joaquin Valley Unified Air Pollution Control District; Prevention of Significant Deterioration AGENCY: Environmental... submitted for the San Joaquin Valley Unified Air Pollution Control District (District) portion of...

  11. 75 FR 8008 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-23

    ... Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY... Pollution Control District (ICAPCD) portion of the California State Implementation Plan (SIP). These... construction sites, unpaved roads, and disturbed soils in open and agricultural areas. We are proposing...

  12. 78 FR 7703 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    .... SUMMARY: EPA is proposing to approve a revision to the South Coast Air Quality Management District (SCAQMD... designed to implement the 2003 Air Quality Management Plan (AQMP) control measure, WST-01, and establish... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air...

  13. 77 FR 52277 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-29

    ... AGENCY 40 CFR Part 52 Approval of Air Quality Implementation Plans; California; South Coast Air Quality... submitted for the South Coast Air Quality Management District (District) portion of the California State... the prevention of significant deterioration of air quality and visibility protection. The purpose...

  14. 76 FR 47094 - Revisions to the California State Implementation Plan; South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-04

    ... proposing to approve a revision to the South Coast Air Quality Management District portion of the California... following local rule: South Coast Air Quality Management District Rule 1175, Control of Emissions from the... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan; South Coast Air...

  15. 77 FR 58313 - Revisions to the California State Implementation Plan, San Diego County, Antelope Valley and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, San Diego County, Antelope... District (MBUAPCD) and Antelope Valley Air Quality Management District (AVAQMD) portions of the California..., ``Graphic Arts Operations,'' adopted on November 9, 2011 and effective on May 9, 2012. (D) Antelope...

  16. 78 FR 58460 - Revision of Air Quality Implementation Plan; California; Placer County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-24

    ... AGENCY 40 CFR Part 52 Revision of Air Quality Implementation Plan; California; Placer County Air Pollution Control District and Feather River Air Quality Management District; Stationary Source Permits... California as a revision to the Placer County Air Pollution Control District (PCAPCD) and Feather River...

  17. 75 FR 45080 - Revisions to the California State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-02

    ... Implementation Plan (SIP). These revisions concern oxides of nitrogen (NO X ) emissions from boilers, steam... Boilers, Steam Generators 12/17/09 05/17/10 and Process Heaters-- 0.75 to less than 2.0 MMbtu/hr. On June... from boilers, steam generators, process heaters and water heaters with a total rated heat input...

  18. 76 FR 30896 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-27

    ... proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of the... overwhelmingly formed as a secondary pollutant. (South Coast 2007 Air Quality Management Plan, page ES-9... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air...

  19. 78 FR 59840 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-30

    ... of plan. * * * * * (c) * * * (428) * * * (i) * * * (B) Antelope Valley Air Quality Management...) * * * (i) * * * (B) Antelope Valley Air Quality Management District. (1) Rule 431.1, ``Sulfur Content of... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air...

  20. Environmental Assessment, Wing Infrastructure Development Outlook (WINDO) Implementation Plan (FY 04-06). Volume 1, Beale Air Force Base, California

    DTIC Science & Technology

    2005-07-01

    Environmental Assessment Wing Infrastructure Development Outlook (WINDO) Implementation Plan (FY 04-06) Volume 1 Beale Air Force Base, California ...Development Outlook (WINDO) Implementation Plan (FY 04-06) Volume 1 Beale Air Force Base, California 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM...THE PROPOSED ACTION Wing Infrastructure Development Outlook (WINDO) Implementation Plan at Beale Air Force Base (AFB), California : Volume 1

  1. 77 FR 73320 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-10

    ... AGENCY 40 CFR Part 52 Approval of Air Quality Implementation Plans; California; South Coast Air Quality... Air Quality Management District regarding specific implementation of parts of the Prevention of Significant Deterioration program. (i) Incorporation by reference. (A) South Coast Air Quality...

  2. 77 FR 11990 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-28

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District and Yolo-Solano Air Quality Management District AGENCY: Environmental Protection Agency... Quality Management District (MDAQMD) and Yolo-Solano Air Quality Management District (YSAQMD) portions...

  3. 76 FR 44535 - Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-26

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management District, Sacramento Metropolitan Air Quality Management District, and South Coast Air Quality... proposing to approve revisions to the Northern Sierra Air Quality Management District (NSAQMD),...

  4. 77 FR 47581 - Revisions to the California State Implementation Plan, Mojave Desert, Northern Sierra, Sacramento...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert, Northern... Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Mojave...

  5. 77 FR 66780 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-07

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  6. 78 FR 18853 - Revision to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-28

    ... taking direct final action to approve a revision to the South Coast Air Quality Management District...) * * * (411) * * * (i) * * * (F) South Coast Air Quality Management District. (1) Rule 463, ``Organic Liquid... AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan, South Coast Air...

  7. 75 FR 61367 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  8. 78 FR 58459 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-24

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District, Santa Barbara County Air Pollution Control District, South Coast Air Quality Management... Quality Management District (SCAQMD) and Ventura County Air Pollution Control District (VCAPCD)...

  9. 77 FR 53773 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-04

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District (SCAQMD) AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA... Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); Does...

  10. 77 FR 58076 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-19

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  11. 76 FR 70888 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-16

    ... finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of the... Quality Management District--SCAQMD) (1) Rule 1143, ``Consumer Paint Thinners & Multi-purpose Solvents... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air...

  12. 76 FR 78829 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-20

    ... taking direct final action to approve a revision to the South Coast Air Quality Management District... Reference (A) South Coast Air Quality Management District (1) Rule 2005, ``New Source Review for RECLAIM... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air...

  13. 76 FR 50128 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  14. 78 FR 5305 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-25

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  15. 75 FR 46845 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-04

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the South Coast Air Quality Management...

  16. 77 FR 12493 - Revisions to the California State Implementation Plan, Feather River Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... River Air Quality Management District. (1) Rule 3.22, ``Internal Combustion Engines,'' adopted on June... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Feather River Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA...

  17. 77 FR 47535 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the Sacramento Metropolitan Air Quality Management District portion of the California State Implementation Plan (SIP). This revision concerns...

  18. 77 FR 32398 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve a revision to the South Coast Air Quality Management...

  19. 78 FR 56639 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-13

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of...

  20. 76 FR 41744 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  1. 78 FR 25011 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-29

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District, Santa Barbara County Air Pollution Control District, South Coast Air Quality Management... Quality Management District (SCAQMD) and Ventura County Air Pollution Control District (VCAPCD)...

  2. 78 FR 18244 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  3. 75 FR 32293 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-08

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the South Coast Air Quality Management...

  4. 77 FR 13495 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-07

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  5. 76 FR 47074 - Revision to the California State Implementation Plan; South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-04

    ... taking direct final action to approve a revision to the South Coast Air Quality Management District... Air Quality Management District (SCAQMD) Rule 1175, adopted on November 5, 2010, and submitted by the... AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan; South Coast Air...

  6. 78 FR 59249 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-26

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  7. 78 FR 30768 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  8. 75 FR 25798 - Revisions to the California State Implementation Plan, Yolo Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-10

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo Solano Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Yolo-Solano Air Quality Management District (YSAQMD) portion of...

  9. 76 FR 78871 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-20

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of...

  10. 77 FR 32483 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South Coast Air Quality Management District portion of the...

  11. 77 FR 12495 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency... the Antelope Valley Air Quality Management District (AVAQMD) and Mojave Desert Air Quality...

  12. 75 FR 32353 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-08

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District portion of the...

  13. 76 FR 40303 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-08

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing a limited approval and limited disapproval of revisions to the South Coast Air Quality...

  14. 77 FR 12526 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Mojave Desert Quality Management District AGENCY: Environmental Protection Agency... Quality Management District (AVAQMD) and Mojave Desert Air Quality Management District (MDAQMD) portion...

  15. 78 FR 49925 - Revisions to California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-16

    ... the Antelope Valley Air Quality Air Management District (AVAQMD) and Ventura County Air Pollution... AGENCY 40 CFR Part 52 Revisions to California State Implementation Plan, Antelope Valley Air Quality Management District and Ventura County Air Pollution Control District AGENCY: Environmental Protection...

  16. 78 FR 49992 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-16

    ... Quality Management District (AVAQMD) and Ventura County Air Pollution Control District (VCAPCD) portions... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Ventura County Air Pollution Control District AGENCY: Environmental Protection...

  17. 76 FR 76115 - Revisions to the California State Implementation Plan, Feather River Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Feather River Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing a limited approval and limited disapproval of revisions to the Feather River Air...

  18. 76 FR 41717 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the South Coast Air Quality Management...

  19. 76 FR 50891 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-17

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District (SCAQMD) AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA... sources, to achieve emissions reductions milestones, to attain and maintain ambient air quality...

  20. 77 FR 11992 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-28

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing a limited approval and limited disapproval of revisions to the Mojave Desert Air...

  1. 75 FR 46880 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-04

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  2. 78 FR 37757 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-24

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  3. 76 FR 72142 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-22

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District portion of the...

  4. 78 FR 6784 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-31

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution... proposing to approve revisions to the Placer County Air Pollution Control District (PCAPCD) portion of the... approve local rules to regulate this emission source under the Clean Air Act (CAA or the Act). DATES:...

  5. 77 FR 67322 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-09

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution... proposing to approve revisions to the Placer County Air Pollution Control District (PCAPCD) portion of the... of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Incorporation...

  6. 76 FR 30025 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-24

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution Control District and Ventura County Air Pollution Control District AGENCY: Environmental Protection Agency... the Placer County Air Pollution Control District (PCAPCD) and Ventura County Air Pollution...

  7. 77 FR 2643 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-19

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution... finalizing a limited approval and limited disapproval of revisions to the Placer County Air Pollution Control...) * * * (i) * * * (D) Placer County Air Pollution Control District (1) Rule 233, ``Biomass Boilers,''...

  8. 75 FR 2079 - Revisions to the California State Implementation Plan, San Joaquin Valley Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-14

    ... facilities. Also, please see our response to CPF comment 3. B. San Joaquin Valley Air Pollution Control...) San Joaquin Valley Unified Air Pollution Control District. (1) Rule 4570, ``Confined Animal Facilities... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, San Joaquin Valley...

  9. 76 FR 30080 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-24

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution Control District and Ventura County Air Pollution Control District AGENCY: Environmental Protection Agency... Pollution Control District (PCAPCD) and Ventura County Air Pollution Control District (VCAPCD) portion...

  10. 78 FR 896 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-07

    ... is finalizing approval of revisions to the Imperial County Air Pollution Control District (ICAPCD...)(2)). List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Imperial County...

  11. 78 FR 6736 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-31

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution... taking direct final action to approve revisions to the Placer County Air Pollution Control District..., however, provide for Air Pollution Control Officer (APCO) discretion to allow burning on a No-Burn...

  12. 76 FR 75795 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-05

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution... taking direct final action to approve revisions to the Placer County Air Pollution Control District... CFR Part 52 Environmental protection, Air pollution control, Incorporation by reference, Reporting...

  13. 76 FR 54993 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-06

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution... proposing a limited approval and limited disapproval of ] revisions to the Placer County Air Pollution... 40 CFR Part 52 Environmental protection, Air pollution control, Intergovernmental relations,...

  14. 77 FR 73322 - Revisions to the California State Implementation Plan, Monterey Bay Unified Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-10

    ...: EPA is taking direct final action to approve revisions to the Monterey Bay Unified Air Pollution... Part 52 Environmental protection, Air pollution control, Incorporation by reference, Intergovernmental... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Monterey Bay Unified...

  15. 76 FR 17347 - Revision to the California State Implementation Plan, Great Basin Unified Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-29

    ...) * * * (D) Great Basin Unified Air Pollution Control District (1) Rule 201, ``Exemptions,'' adopted on... AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan, Great Basin Unified Air Pollution Control District CFR Correction In Title 40 of the Code of Federal Regulations, Part 52 (Sec....

  16. 77 FR 7536 - Revisions to the California State Implementation Plan, Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-13

    ... is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control District... 40 CFR Part 52 Environmental protection, Air pollution control, Incorporation by reference, Reporting... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Joaquin Valley Unified...

  17. 76 FR 75857 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-05

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution... proposing to approve revisions to the Placer County Air Pollution Control District (PCAPCD) portion of the... local rules to regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or...

  18. 78 FR 37130 - Revisions to the California State Implementation Plan, San Diego Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-20

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, San Diego Air Pollution... taking direct final action to approve a revision to the San Diego Air Pollution Control District (SDAPCD... Part 52 Environmental protection, Air pollution control, Incorporation by reference,...

  19. 77 FR 25109 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-27

    ...: EPA is proposing to approve revisions to the Imperial County Air Pollution Control District (ICAPCD... of Subjects in 40 CFR Part 52 Air pollution control, Environmental protection, Intergovernmental... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Imperial County...

  20. 75 FR 1284 - Revisions to the California State Implementation Plan, Ventura County Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-11

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Ventura County Air Pollution... finalizing approval of revisions to the Ventura County Air Pollution Control District (VCAPCD) portion of the...)(2)). List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution...

  1. 78 FR 922 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-07

    ...: EPA is proposing to approve revisions to the Imperial County Air Pollution Control District (ICAPCD... of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Intergovernmental... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Imperial County...

  2. 75 FR 56942 - Revisions to the California State Implementation Plan, San Diego County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, San Diego County Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the San Diego Air Pollution Control District...

  3. 77 FR 745 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-06

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) Correction In rule document 2011-33660 appearing on...

  4. 76 FR 5319 - Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-31

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control District, Placer County Air Pollution Control District, Antelope Valley Air Quality Management District, and Ventura County Air Pollution Control District AGENCY: Environmental Protection Agency...

  5. 76 FR 5277 - Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-31

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control District, Antelope Valley Air Quality Management District, Ventura County Air Pollution Control District and Placer County Air Pollution Control District AGENCY: Environmental Protection Agency...

  6. 75 FR 27975 - Revisions to the California State Implementation Plan; Imperial County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-19

    ...: EPA is proposing to approve revisions to the Imperial County Air Pollution Control District (ICAPCD... of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Intergovernmental... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan; Imperial County...

  7. 76 FR 68103 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-03

    ... Unified Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control... Rulemaking For the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

  8. 78 FR 37176 - Revisions to the California State Implementation Plan, San Diego Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-20

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, San Diego Air Pollution... proposing to approve a revision to the San Diego Air Pollution Control District (SDAPCD) portion of the... sources under the Clean Air Act (CAA or the Act). DATES: Any comments on this proposal must arrive by...

  9. 78 FR 53249 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution... finalizing approval of revisions to the Placer County Air Pollution Control District (PCAPCD) portion of the... 40 CFR Part 52 Environmental protection, Air pollution control, Incorporation by...

  10. 77 FR 73392 - Revisions to the California State Implementation Plan, Monterey Bay Unified Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-10

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Monterey Bay Unified Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Monterey Bay Unified Air Pollution Control...

  11. 76 FR 61069 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-03

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District, Ventura County Air Pollution Control District, and Placer County Air... (SMAQMD), Ventura County Air Pollution Control District (VCAPCD), and Placer County Air Pollution...

  12. 77 FR 12491 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... revisions to the Antelope Valley Air Quality Management District (AVAQMD) and San Joaquin Valley Unified Air..., 2011, the submittal for Antelope Valley AQMD and SJVUAPCD Negative Declarations submitted on June...

  13. 77 FR 2496 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-18

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the...

  14. 77 FR 2469 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-18

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... to the Antelope Valley Air Quality Management District (AVAQMD) and Imperial County Air Pollution.... * * * * * (G) Antelope Valley Air Quality Management District. (1) Rule 1134, ``Stationary Gas...

  15. 77 FR 12527 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... Antelope Valley Air Quality Management District (AVAQMD) and San Joaquin Valley Unified Air...

  16. 77 FR 26448 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... approve revisions to the Antelope Valley Air Quality Management District (AVAQMD), Eastern Kern Air... rules were developed as part of the local agency's program to control these pollutants. Antelope...

  17. 78 FR 21545 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... approve revisions to the Antelope Valley Air Quality Management District (AVAQMD) and Monterey Bay Unified... developed as part of the local agency's program to control these pollutants. Antelope Valley AQMD Rule...

  18. 78 FR 53711 - Revisions to the California State Implementation Plan, Placer, Santa Barbara and Ventura County...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-30

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer, Santa Barbara and... District (PCAPCD), Santa Barbara County Air Pollution Control District (SBCAPCD) and Ventura County...

  19. 75 FR 39365 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-08

    ...EPA is finalizing a limited approval and limited disapproval of revisions to the Imperial County Air Pollution Control District (ICAPCD or the District) portion of the California State Implementation Plan (SIP) under the Clean Air Act as amended in 1990 (CAA or the Act). This action was proposed in the Federal Register on February 23, 2010 and concerns local rules that regulate coarse......

  20. 76 FR 55842 - Partial Approval and Partial Disapproval of Air Quality Implementation Plans; California; San...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-09

    ... AGENCY 40 CFR Part 52 Partial Approval and Partial Disapproval of Air Quality Implementation Plans; California; San Joaquin Valley; Reasonably Available Control Technology for Ozone AGENCY: Environmental... disapprove a revision to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD or...

  1. Environmental Assessment, Wing Infrastructure Development Outlook (WINDO) Implementation Plan (FY 04-06). Volume 2, Beale Air Force Base, California

    DTIC Science & Technology

    2005-08-01

    Environmental Assessment Wing Infrastructure Development Outlook (WINDO) Implementation Plan (FY 04-06) Volume 2 Beale Air Force Base, California ...Development Outlook (WINDO) Implementation Plan (FY 04-06) Volume 2 Beale Air Force Base, California 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM...Beale Air Force Base (AFB). California : Volume 2. 2.0 DESCRIPTION OF PROPOSED ACTION AND NO ACTION ALTERNATIVES Proposed Action. The Proposed Action

  2. 76 FR 55621 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-08

    ... proposing to approve a revision to the Yolo-Solano Air Quality Management District portion of the California... local rule: Yolo-Solano Air Quality Management District Rule 2.41, Expandable Polystyrene Manufacturing... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo- Solano Air...

  3. Environmental protection Implementation Plan

    SciTech Connect

    R. C. Holland

    1999-12-01

    This ``Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ``Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities.

  4. 76 FR 27613 - Revisions to the California State Implementation Plan, California Air Resources Board-Consumer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-12

    ... amended regulations were submitted on February 16, 2010, by the Governor's designee. (i) Incorporation by... evaluation. II. Public Comments and EPA Responses EPA's proposed action provided a 30-day public comment... regulations. The submitted comment is not germane to this action as amendments to California's...

  5. 75 FR 25778 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-10

    ... taking direct final action to approve revisions to the Yolo-Solano Air Quality Management District... Identification of plan. * * * * * (c) * * * (377) * * * (i) * * * (B) Yolo Solano Air Quality Management District... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo- Solano Air...

  6. 76 FR 41561 - Approval and Promulgation of Implementation Plans; California; 2007 South Coast PM2.5

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-14

    ...EPA is proposing to approve in part and disapprove in part state implementation plan (SIP) revisions submitted by California to provide for attainment of the 1997 fine particulate matter (PM2.5) national ambient air quality standards in the Los Angeles-South Coast area (South Coast). These SIP revisions are the South Coast 2007 Air Quality Management Plan (South Coast 2007 AQMP)......

  7. 76 FR 48006 - Limited Federal Implementation Plan; Prevention of Significant Deterioration; California; North...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-08

    ...; California; North Coast Unified Air Quality Management District AGENCY: Environmental Protection Agency (EPA... Coast Unified Air Quality Management District (NCUAQMD) portion of the California State Implementation... Act (CAA) section 110(a)(2)(D)(i) for the 1997 8-hour ozone National Ambient Air Quality...

  8. 77 FR 23133 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-18

    ... taking direct final action to approve revisions to the Yolo-Solano Air Quality Management District (Yolo.... * * * * * (381) * * * (i) * * * (I) Yolo-Solano Air Quality Management District. (1) Rule 2.3, ``Ringelmann Chart... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo- Solano Air...

  9. 75 FR 19923 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Yolo-Solano Air Quality Management District (YSAQMD) portion of...

  10. 77 FR 23193 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-18

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Yolo-Solano Air Quality Management District portion of the...

  11. 75 FR 37308 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-29

    ... finalizing approval of revisions to the Yolo-Solano Air Quality Management District (YSAQMD) portion of the...) * * * (i) * * * (C) Yolo Solano Air Quality Management District (1) Rule 3.21, ``Rice Straw Emission... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo- Solano Air...

  12. Implementing Local Accountability in California's Schools: The First Year of Planning

    ERIC Educational Resources Information Center

    Warren, Paul; Carrillo, Giselle

    2015-01-01

    The passage of the Local Control Funding Formula (LCFF) in 2013 gave California school districts flexibility in allocating resources and significantly boosted state support for the education of disadvantaged students. LCFF also includes a Local Control and Accountability Plan (LCAP), which requires districts to enlist the help of parents and the…

  13. 77 FR 74355 - Approval of Air Quality Implementation Plans; California; San Joaquin Valley; Attainment Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ..., 2012. FOR FURTHER INFORMATION CONTACT: Frances Wicher, Air Planning Office (AIR-2), U.S. Environmental Protection Agency, Region 9, (415) 972- 3957, wicher.frances@epa.gov . SUPPLEMENTARY INFORMATION:...

  14. 75 FR 60623 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule... Valley Unified Air Pollution Control District (SJVUAPCD) portion of the California State Implementation... Ventura County Air Pollution Control District (VCAPCD) Rule 74.15 (as amended November 8, 1994)....

  15. 75 FR 1716 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-13

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule... Valley Unified Air Pollution Control District (SJVUAPCD) portion of the California State Implementation... authority to regulate sources of air pollution. The fee provision of CAA section 185 acts as an...

  16. 76 FR 298 - Revisions to the California State Implementation Plan, San Joaquin Valley Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-04

    ... Valley Unified Air Pollution Control District (SJVUAPCD) portion of the California State Implementation......... 12/17/92 08/24/07 On September 17, 2007, the submittal for San Joaquin Valley Unified Air Pollution... require that fixed covers be equipped with a 95% efficient Air Pollution Control (APC) device. c....

  17. 77 FR 66548 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is approving revisions to the San Joaquin Valley Unified Air Pollution Control District... State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District's Rule 4352,...

  18. 78 FR 53113 - Approval and Promulgation of Implementation Plans; California; San Joaquin Valley; Contingency...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-28

    ... clocks and a federal implementation plan clock that were triggered by EPA's partial disapproval of a... triggered mandatory sanctions clocks under CAA section 179(b) and an obligation on EPA to promulgate...

  19. 78 FR 64402 - Approval and Promulgation of Implementation Plans; California; South Coast; Contingency Measures...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ... Air Basin (South Coast). Approval of this SIP revision terminates the sanctions clocks and a federal implementation plan (FIP) clock that were triggered by EPA's partial disapproval of a related SIP submission on... terminates the CAA section 179(b) sanctions clocks triggered by that action and the obligation on EPA...

  20. 75 FR 27938 - Approval and Promulgation of Implementation Plans; State of California; Legal Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-19

    ... appendix (entitled ``Appendix II: State Statutes and other Legal Documents Pertinent to Air Pollution... revised legal authority chapter provides an overview of air pollution control in California. While the..., the 1979 SIP revision simply incorporates by reference the 1978 edition of California Air...

  1. 77 FR 71551 - Approval and Promulgation of Implementation Plans; California; Determinations of Attainment for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-03

    ... NAAQ, the basis for the suspension of the requirements for that area, provided by 40 CFR 51.918, would... for that area, provided by 40 CFR 51.918, would no longer exist, and the violating ozone nonattainment... areas in California. First, EPA is determining that six 8-hour ozone nonattainment areas in...

  2. California Mobile Source Regulations; Final Approval and Promulgation of Implementation Plans

    EPA Pesticide Factsheets

    EPA is taking direct final action to approve a revision to the California SIP establishing standards and other requirements relating to the control of emissions from new on-road and new and in-use off-road vehicles and engines.

  3. 78 FR 53680 - Revisions to the California State Implementation Plan, Placer, Santa Barbara and Ventura County...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-30

    .... 7401 et seq. Subpart F--California 0 2. Section 52.220, is amended by adding paragraphs (c)(423)(i)(E... there other versions of these rules? C. What is the purpose of the submitted rules? II. EPA's Evaluation and Action A. How is EPA evaluating the rules? B. Do the rules meet the evaluation criteria? C....

  4. 76 FR 39777 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollutions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-07

    ... Air Pollutions Control District (SJVUAPCD) AGENCY: Environmental Protection Agency (EPA). ACTION... San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the California State... Rule 344 D.2.b.2 require that fixed covers be equipped with a 95% efficient Air Pollution Control...

  5. 75 FR 26102 - Approval and Promulgation of Implementation Plans, State of California, San Joaquin Valley...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-11

    ...,'' ``us'' and ``our'' refer to EPA. Table of Contents I. Proposed Action A. Correction of EPA's May 2004... of State law, we have decided to request the State of California to provide us with a legal... not new language, nor is it new interpretation. There is no confusion in the legislative history,...

  6. 77 FR 1895 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-12

    ... action, we are proposing to approve South Coast Air Quality Management District (SCAQMD) Rule 317.... South Coast Air Quality Management District There are two 1-hour ozone nonattainment areas within the... Quality Management Plan, as revised in 1999.\\9\\ The approved 1-hour ozone SIP in the Southeast...

  7. 77 FR 39181 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-02

    ... Management District (MDAQMD) and Yolo-Solano Air Quality Management District (YSAQMD) AGENCY: Environmental... Identification of plan. * * * * * (c) * * * (364) * * * (i) * * * (D) Mojave Desert Air Quality Management...) * * * (F) Yolo-Solano Air Quality Management District. (1) Rule 2.43, ``Biomass Boilers,'' adopted...

  8. 75 FR 3996 - Revisions to the California State Implementation Plan, San Joaquin Valley Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-26

    ... Planning, San Joaquin Valley Air Pollution Control District; letter dated and received August 17, 2009... Sadredin, Executive Director/Air Pollution Control Officer of San Joaquin Valley Air Pollution Control...: EPA's Analysis of San Joaquin Valley Unified Air Pollution Control District's Rule 4684,...

  9. 77 FR 50021 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: In this action, EPA is finalizing approval of San Joaquin Valley Unified Air Pollution Control... plans that are specifically tailored to the nature of the air pollution sources in each state. The...

  10. 78 FR 75293 - Approval and Promulgation of Implementation Plans; State of California; 2012 Los Angeles County...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-11

    ... it, or by ingesting lead-contaminated food, water, soil, or dust. Once in the body, lead is quickly... Disposal: Incinerators 0.01 Petroleum Production & Marketing: Petroleum Refining 0.03 Industrial Processes... rolling average) and are ready for fast implementation if the 0.15 g/m\\3\\ standard NAAQS is exceeded....

  11. 76 FR 69895 - Approval and Promulgation of Implementation Plans; California; 2008 San Joaquin Valley PM2.5

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-09

    ... Trading Mechanism for Transportation Conformity V. Final Actions and Resulting Clean Air Act Consequences... Legislative Analyst's Office, California Energy Commission, UCLA Anderson School, Beacon Economics, University of the Pacific, Congressional Budget Office, and US Energy Information Agency. Id. pp....

  12. Implementation of Title V in California

    SciTech Connect

    Werner, B.; Cook, B.

    1996-12-31

    This presentation provides information on California`s Title V operating permit programs for stationary sources mandated by the 1990 Clean Air Act amendments. It covers background, applicability, regulatory history, requirements, and issues. In addition, specific information is provided on the progress of Title V implementation in California, including: the roles of implementing agencies, the status of district Title V programs, number and distribution of Title V sources, cost of Title V implementation, and highlights of Title V implementation in the State. The question and answer format is intended to facilitate easy access to specific information related to the Title V operating permit programs in California.

  13. Strategic implementation plan

    NASA Technical Reports Server (NTRS)

    1989-01-01

    The Life Science Division of the NASA Office of Space Science and Applications (OSSA) describes its plans for assuring the health, safety, and productivity of astronauts in space, and its plans for acquiring further fundamental scientific knowledge concerning space life sciences. This strategic implementation plan details OSSA's goals, objectives, and planned initiatives. The following areas of interest are identified: operational medicine; biomedical research; space biology; exobiology; biospheric research; controlled ecological life support; flight programs and advance technology development; the life sciences educational program; and earth benefits from space life sciences.

  14. 77 FR 20308 - Approval and Promulgation of Implementations Plans; California Air Resources Board-In-Use Heavy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-04

    ..., 2011 (76 FR 40652), EPA proposed to approve title 13, California Code of Regulations (CCR), section... for this detailed information. See 76 FR at 40653- 40654. The regulations were developed by CARB to... and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); Does not impose an...

  15. Environmental Implementation Plan

    SciTech Connect

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  16. Environmental Implementation Plan

    SciTech Connect

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  17. 76 FR 40652 - Approval and Promulgation of Implementation Plans; California Air Resources Board-In-Use Heavy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-11

    ... implementing the provisions of MARPOL Annex VI through its ocean- going vessel rule (75 FR 22895). Under these.... See 75 FR 11880 (March 12, 2010) for the most recent related EPA announcement concerning...

  18. 76 FR 55581 - Revision to the California State Implementation Plan; Yolo-Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-08

    ... taking direct final action to approve a revision to the Yolo-Solano Air Quality Management District... did the State submit? We are approving Yolo-Solano Air Quality Management District (YSAQMD) Rule 2.41... Identification of plan. * * * * * (c) * * * (364) * * * (i) * * * (C) Yolo-Solano Air Quality Management...

  19. Energy Shortage Contingency Plan. (California Energy Commission)

    SciTech Connect

    Not Available

    1994-03-01

    The California Energy Commission's 1993 Energy Shortage Contingency Plan is prepared in response to state legislative requirements. The statute directs the California Energy Commission to prepare and submit to the Governor and Legislature contingency plans to deal with possible shortages of electrical energy or fuel supplies to protect public health, safety and welfare.

  20. Environmental Implementation Plan

    SciTech Connect

    Not Available

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  1. Advanced Planning for Tsunamis in California

    NASA Astrophysics Data System (ADS)

    Miller, K.; Wilson, R. I.; Larkin, D.; Reade, S.; Carnathan, D.; Davis, M.; Nicolini, T.; Johnson, L.; Boldt, E.; Tardy, A.

    2013-12-01

    The California Tsunami Program is comprised of the California Governor's Office of Emergency Services (CalOES) and the California Geological Survey (CGS) and funded through the National Tsunami Hazard Mitigation Program (NTHMP) and the Federal Emergency Management Agency (FEMA). The program works closely with the 20 coastal counties in California, as well as academic, and industry experts to improve tsunami preparedness and mitigation in shoreline communities. Inundation maps depicting 'worst case' inundation modeled from plausible sources around the Pacific were released in 2009 and have provided a foundation for public evacuation and emergency response planning in California. Experience during recent tsunamis impacting the state (Japan 2011, Chile 2010, Samoa 2009) has brought to light the desire by emergency managers and decision makers for even more detailed information ahead of future tsunamis. A solution to provide enhanced information has been development of 'playbooks' to plan for a variety of expected tsunami scenarios. Elevation 'playbook' lines can be useful for partial tsunami evacuations when enough information about forecast amplitude and arrival times is available to coastal communities and there is sufficient time to make more educated decisions about who to evacuate for a given scenario or actual event. NOAA-issued Tsunami Alert Bulletins received in advance of a distant event will contain an expected wave height (a number) for each given section of coast. Provision of four elevation lines for possible inundation enables planning for different evacuation scenarios based on the above number potentially alleviating the need for an 'all or nothing' decision with regard to evacuation. Additionally an analytical tool called FASTER is being developed to integrate storm, tides, modeling errors, and local tsunami run-up potential with the forecasted tsunami amplitudes in real-time when a tsunami Alert is sent out. Both of these products will help

  2. TRUPACT-1 implementation plan

    SciTech Connect

    Hurley, J.D.; Tappen, J.J. . Joint Integration Office); Christensen, D.S. )

    1985-09-01

    TRUPACT-1, the TRansUranic PACkage Transporter is a packaging designed to transport defense contact handled transuranic (CH-TRU) waste from generating and interim TRU waste storage facilities to the Waste Isolation Pilot Plant (WIPP). Prior to fabrication and procurement of a full fleet, an initial design (TRUPACT-1) will be introduced to the defense TRU waste complex through use in an operational prototype fleet which will consist of Units 1, 2, and 3. In an effort to provide a relatively smooth introduction of the TRUPACT-1, the TRUPACT Technical Team (TTT) has developed the following implementation plan. The plan provides detailed information on user handling opportunities, schedules, equipment, responsibilities, reporting and data collection activities to be performed. The intent of this document is to provide users of the TRUPACT-1 with a guidance document, complete with references, that will allow the smooth introduction of this new transportation system by providing the information necessary for collecting operational, performance and cost data. These data will be used in modeling and full fleet design and procurement activities. In addition, these data will help fine tune procedures in the inspection and maintenance document and the operational document. Additional objectives of this plan are to aid in the establishment of site operational, inspection and maintenance procedures as well as training of site operators and briefing state and local officials.

  3. Implementation of ecological assessment in southern California

    SciTech Connect

    Pierce, R.S.; Ruiter, T.L. |

    1994-12-31

    Under the Department of Defense Installation Restoration Program for the Navy, an ecological assessment was undertaken as part of a remedial investigation at a southern California naval facility. The work plan that was implemented was the result of negotiation and collaboration between the Navy and federal and state natural resource regulatory agencies. The facility is located on a natural lagoon connected to the Pacific Ocean and supported by a large tidal wetland system. In addition to issues related to the intrinsic values of the wetlands, the agencies were concerned about the effects of implementation of the studies on several special status species that use the facility. The ecological assessment involved sampling of vegetation, mammals, fish, benthos, sediment, and water at eight sites. In addition, a bathymetric survey and tidal study of the lagoon were undertaken to support the studies. Sampling was constrained by the anticipated and early presence of special status species. Coordination of the field program was critical to minimizing impact on the special status species and completing the sampling by the required end date. Initial sampling resulted in recommendations for the remainder of the ecological assessment and the identification of potential interim actions that would provide early restoration of habitat on the facility.

  4. Air Quality Implementation Plans

    EPA Pesticide Factsheets

    States must develop plans to attain and maintain air quality standards. These plans, known as SIPs, are submitted to EPA for approval. This web site contains information about this process and the current status of the submittals.

  5. Implementing California's Law on Assisted Dying.

    PubMed

    Mishra, Ruchika

    2017-03-01

    On October 5, 2015, Governor Jerry Brown approved bill ABX2 15, the End of Life Option Act, making California the fifth state in the country to allow physician-assisted dying. The law was modeled after Oregon's 1997 Death with Dignity Act. When the legislative special session ended on March 10, 2016, California health care providers had only ninety days to respond to the state mandate before the law would take effect, on June 9, 2016. Experience with the law so far suggests several challenges with implementation.

  6. Owens Valley Serious Area Plan for the 1987 24-Hour PM10; Final Approval of California Air Plan

    EPA Pesticide Factsheets

    EPA is taking final action to approve a state implementation plan (SIP) revision submitted by the State of California to meet Clean Air Act equirements applicable to the Owens Valley PM10 nonattainment area.

  7. Environmental implementation plan

    SciTech Connect

    Peterson, G.L.

    1994-10-04

    In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities.

  8. Higher Education in California: New Goals for the Master Plan

    ERIC Educational Resources Information Center

    Johnson, Hans

    2010-01-01

    Fifty years ago, state policymakers and higher education officials adopted California's Master Plan for Higher Education. This plan still largely defines policies concerning the state's public higher education systems: the California community colleges (CCC), the California State University (CSU) system, and the University of California (UC)…

  9. Western Mojave Desert, Rate of Progress Demonstration; Proposed Approval of California Air Plan Revision

    EPA Pesticide Factsheets

    EPA is proposing to approve a state implementation plan revision submitted by the State of California to meet Clean Air Act requirements applicable to the Western Mojave Desert (WMD) ozone nonattainment area.

  10. San Joaquin Valley Unified Air Pollution Control District; Proposed Approval of California Air Plan Revision

    EPA Pesticide Factsheets

    EPA is proposing to approve a revision to the SJVUAPCD portion of the California State Implementation Plan (SIP) concerning emissions of oxides of nitrogen (NOX) and particulate matter (PM) from boilers, steam generators, and process heaters.

  11. Implementation plan for operating alternatives for the Naval Computer and Telecommunications Station cogeneration facility at Naval Air Station North Island, San Diego, California

    SciTech Connect

    Carroll, D.M.; Parker, S.A.; Stucky, D.J.

    1994-04-01

    The goal of the US Department of Energy (DOE) Federal Energy Management Program (FEMP) is to facilitate energy efficiency improvements at federal facilities. This is accomplished by a balanced program of technology development, facility assessment, and use of cost-sharing procurement mechanisms. Technology development focuses upon the tools, software, and procedures used to identify and evaluate energy efficiency technologies and improvements. For facility assessment, FEMP provides metering equipment and trained analysts to federal agencies exhibiting a commitment to improve energy use efficiency. To assist in procurement of energy efficiency measures, FEMP helps federal agencies devise and implement performance contracting and utility demand-side management strategies. Pacific Northwest Laboratory (PNL) supports the FEMP mission of energy systems modernization. Under this charter, the Laboratory and its contractors work with federal facility energy managers to assess and implement energy efficiency improvements at federal facilities nationwide. The SouthWestern Division of the Naval Facilities Engineering Command, in cooperation with FEMP, has tasked PNL with developing a plan for implementing recommended modifications to the Naval Computer and Telecommunications Station (NCTS) cogeneration plant at the Naval Air Station North Island (NASNI) in San Diego. That plan is detailed in this report.

  12. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true Implementation plan. 598.605 Section... Grants § 598.605 Implementation plan. (a) Implementation plan content. An EZ must submit an implementation plan for HUD approval that addresses each project or activity proposed to be undertaken by the...

  13. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 3 2013-04-01 2013-04-01 false Implementation plan. 598.605... Empowerment Zone Grants § 598.605 Implementation plan. (a) Implementation plan content. An EZ must submit an implementation plan for HUD approval that addresses each project or activity proposed to be undertaken by the...

  14. 340 Facility maintenance implementation plan

    SciTech Connect

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements.

  15. GENERAL SITE PLAN, HAMILTON AIR FORCE BASE, MARIN COUNTY, CALIFORNIA. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    GENERAL SITE PLAN, HAMILTON AIR FORCE BASE, MARIN COUNTY, CALIFORNIA. Pencil on paper, dated December 4, 1952. Also marked "PWC 103474." By J.Y. Long Company, Engineers, Oakland, California - Hamilton Field, East of Nave Drive, Novato, Marin County, CA

  16. 40 CFR 52.274 - California air pollution emergency plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false California air pollution emergency plan... pollution emergency plan. (a) Since the California Air Pollution Emergency Plan does not provide complete... District (SCAQMD). (2) Sacramento County Air Pollution Control District. (3) Monterey Bay Unified...

  17. 40 CFR 52.274 - California air pollution emergency plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false California air pollution emergency plan... pollution emergency plan. (a) Since the California Air Pollution Emergency Plan does not provide complete... District (SCAQMD). (2) Sacramento County Air Pollution Control District. (3) Monterey Bay Unified...

  18. Land Use Control Implementation Plan

    NASA Technical Reports Server (NTRS)

    Starr, Andrew Scott

    2015-01-01

    This Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of Building M7-505 of institutional controls that have been implemented at the site. Although there are no current unacceptable risks to human health or the environment associated with Building M7-505, institutional land use controls (LUCs) are necessary to prohibit the use of groundwater from the site. LUCs are also necessary to prevent access to soil under electrical equipment in the northwest portion of the site. Controls necessary to prevent human exposure will include periodic inspection, condition certification, and agency notification.

  19. 78 FR 28747 - Approval and Promulgation of Implementation Plans; North Carolina; State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; North Carolina; State Implementation Plan Miscellaneous Revisions AGENCY: Environmental Protection Agency (EPA). ACTION: Direct Final... Carolina State Implementation Plan (SIP) submitted on February 3, 2010, through the North...

  20. 80 FR 60952 - Positive Train Control Safety Plan for the Southern California Regional Rail Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2015-10-08

    ... PTCSP describes the SCRRA I-ETMS implementation and the associated I- ETMS safety processes; safety...-2010-0048] Positive Train Control Safety Plan for the Southern California Regional Rail Authority... Positive Train Control Safety Plan (PTCSP) Version 1.7 for approval under the Federal railroad...

  1. Enterprise Resource Planning Systems: Assessment of Risk Factors by California Community College Leaders

    ERIC Educational Resources Information Center

    Valente, Mario Manuel

    2011-01-01

    Most California Community Colleges have chosen to purchase and implement a Management Information Systems software solution also known as an Enterprise Resource Planning (ERP) system in order to monitor, control, and automate their administrative tasks. ERP implementations are complex, expensive, high profile, and therefore high risk. To reduce…

  2. Tradable renewable energy credits in California: the struggle with implementation

    SciTech Connect

    Hilton, Seth D.; Marriott, Chad T.

    2010-07-15

    On Mar. 11, 2010, the California Public Utilities Commission authorized the use of tradable renewable energy credits to satisfy at least a portion of the obligations imposed by California's Renewables Portfolio Standard. The decision allows California's largest investor-owned utilities and other retail providers to purchase TRECs to meet up to 25 percent of their annual RPS compliance obligations, but implementation has raised a series of questions. (author)

  3. 10 CFR 820.65 - Implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Implementation plan. 820.65 Section 820.65 Energy... plan. With respect to a DOE Nuclear Safety Requirement for which there is no regulatory provision for an implementation plan or schedule, an exemption may be granted to establish an implementation...

  4. 10 CFR 820.65 - Implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Implementation plan. 820.65 Section 820.65 Energy... plan. With respect to a DOE Nuclear Safety Requirement for which there is no regulatory provision for an implementation plan or schedule, an exemption may be granted to establish an implementation...

  5. Planning Targets for Phase II Watershed Implementation Plans

    EPA Pesticide Factsheets

    On August 1, 2011, EPA provided planning targets for nitrogen, phosphorus and sediment for the Phase II Watershed Implementation Plans (WIPs) of the Chesapeake Bay TMDL. This page provides the letters containing those planning targets.

  6. Individualized Career Plan (ICP): Implementation Manual.

    ERIC Educational Resources Information Center

    Batsche, Catherine; And Others

    This implementation manual was designed to assist local education agency personnel implement the individualized career plan (ICP) concept in high schools. Questions commonly asked about the ICP are answered. Guidelines are then provided for implementing the four stages of the process: planning, developing, implementing, and evaluating/refining.…

  7. Schedule optimization study implementation plan

    SciTech Connect

    Not Available

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed.

  8. McClellan Air Force Base Operable Unit B, Two-Phase Extraction System Demonstration Test, Work Implementation Plan for McClellan AFB, California

    DTIC Science & Technology

    1994-08-03

    TechnologyI Evaluation (SITE), and the Public-Private Partners. Table 11-1 also is a breakdown of the equipment, materials, and installation costs...Safety, Section 5.2. 1.). IDuring the planning/ mobilization phase of the program, the contractor shall consult with base personnel about the location

  9. 77 FR 16447 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-21

    ... Quality Planning Purposes; State of California; Ozone; Nitrogen Dioxide; Technical Amendments AGENCY... classifications of certain areas in California for the 1971 annual nitrogen dioxide standard and the 1997...

  10. Facility Planning for Technology Implementation.

    ERIC Educational Resources Information Center

    Ross, Tweed W.; Stewart, G. Kent

    1993-01-01

    When planning new school buildings or modifications to existing structures, checking facility planning in relation to technology planning is critical. Areas requiring serious attention include space, electricity, lighting, security, furnishings, shielding, and acoustics. (MLF)

  11. California Education: Planning for a Better Future

    ERIC Educational Resources Information Center

    Larsen, Eric; Weston, Margaret

    2011-01-01

    Proficiency rates among California students continue to rise. At the end of the 2009-10 school year, the share of students who demonstrated proficiency on the California Standards Test was greater than 50 percent in both English language arts (ELA) and math. California's proficiency rates have increased more than 18 percentage points over the last…

  12. 77 FR 1669 - Endangered and Threatened Species; Recovery Plan for the Southern California Steelhead Distinct...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-11

    ... Plan for the Southern California Steelhead Distinct Population Segment AGENCY: National Marine... (ESA) recovery plan for the Southern California Steelhead (Oncorhynchus mykiss) Distinct Population.... mykiss were most closely related to the more northern populations of the Southern California...

  13. Knocking Down Barriers: How California Superintendents Are Implementing Blended Learning

    ERIC Educational Resources Information Center

    Horn, Michael B.; Gu, Anna; Evans, Meg

    2014-01-01

    School districts across the United States are implementing blended learning to boost student achievement. The authors convened several California school district superintendents to answer the questions: "What are the barriers, real or perceived, to implementing blended learning in your district?" and "Have you found solutions to or…

  14. BENDING SHOP & OVEN. United Engineering Co., Alameda, California. Plan, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    BENDING SHOP & OVEN. United Engineering Co., Alameda, California. Plan, two elevations, sections, and details. Alben Froberg, Architect, Oakland, California. Sheet no. 1 of 1. Various scales. December 15, 1941. pencil on tracing paper - United Engineering Company Shipyard, Bending Shop & Oven, 2900 Main Street, Alameda, Alameda County, CA

  15. The Research and Planning Prospectus for California Community Colleges.

    ERIC Educational Resources Information Center

    RP Group of California Community Colleges, Santa Ana.

    To help researchers and planners, college governing bodies, and state-wide entities gain perspective on myriad events and initiatives impacting California Community Colleges (CCC) and higher education in general, the Research and Planning (RP) Group for California Community Colleges developed this prospectus. The final draft prospectus identifies…

  16. Technology II: Implementation Planning Guide.

    ERIC Educational Resources Information Center

    California Community Colleges, Sacramento. Office of the Chancellor.

    The California Community Colleges (CCC) are facing a number of challenges, including the explosive use of the Internet, the digital divide, the need for integrating technology into teaching and learning, the impact of Tidal Wave II, and the need to ensure that technology is accessible to persons with disabilities. The CCCs' Technology II Strategic…

  17. California Master Plan for Migrant Education, 1976 Edition (Plan Maestro de California para Educacion Migrante, Edicion de 1976).

    ERIC Educational Resources Information Center

    California State Dept. of Education, Sacramento. Div. of Compensatory Education.

    Based on the national migrant education plan, California's master plan aims to mobilize the necessary State and Federal resources, and to unify and assist the efforts of local educational agencies to end the migrant child's failure in school. The plan includes provisions for: instructional activities on a regular and extended year basis designed…

  18. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... URBAN DEVELOPMENT COMMUNITY FACILITIES URBAN EMPOWERMENT ZONES: ROUND TWO AND THREE DESIGNATIONS Empowerment Zone Grants § 598.605 Implementation plan. (a) Implementation plan content. An EZ must submit an... requirements that the state and local governments, as Empowerment Zone designees, have agreed to meet...

  19. 40 CFR 51.851 - State implementation plan (SIP) or Tribal implementation plan (TIP) revision.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 2 2012-07-01 2012-07-01 false State implementation plan (SIP) or... § 51.851 State implementation plan (SIP) or Tribal implementation plan (TIP) revision. (a) A State or... requirements, to demonstrate conformity with the applicable SIP or TIP as required by section 176(c) of the...

  20. 40 CFR 51.851 - State implementation plan (SIP) or Tribal implementation plan (TIP) revision.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 2 2013-07-01 2013-07-01 false State implementation plan (SIP) or... § 51.851 State implementation plan (SIP) or Tribal implementation plan (TIP) revision. (a) A State or... requirements, to demonstrate conformity with the applicable SIP or TIP as required by section 176(c) of the...

  1. 40 CFR 51.851 - State implementation plan (SIP) or Tribal implementation plan (TIP) revision.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 2 2014-07-01 2014-07-01 false State implementation plan (SIP) or... § 51.851 State implementation plan (SIP) or Tribal implementation plan (TIP) revision. (a) A State or... requirements, to demonstrate conformity with the applicable SIP or TIP as required by section 176(c) of the...

  2. 40 CFR 51.851 - State implementation plan (SIP) or Tribal implementation plan (TIP) revision.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 2 2011-07-01 2011-07-01 false State implementation plan (SIP) or... § 51.851 State implementation plan (SIP) or Tribal implementation plan (TIP) revision. (a) A State or... requirements, to demonstrate conformity with the applicable SIP or TIP as required by section 176(c) of the...

  3. Operational Management Plans: Status, Content, and Implementation

    DTIC Science & Technology

    1989-10-01

    A NATURAL RESOURCES RESEARCH PROGRAM US Amy CrpsMISCELLANEOUS PAPER R-89-2 ofEgier OPERATIONAL MANAGEMENT PLANS: STATUS, CONTENT , AND IMPLEMENTATION...NO NO. CCESSIONNO/ 32503 11. TITLE (incude Security Cla m karion) Operational Management Plans: Status, Content , and Implementation 12. PERSONAL...reverse if necessaty and identify by block number) - This report presents the current status, content , and implecrntation of Operational Management Plans

  4. Medicaid beneficiaries in california reported less positive experiences when assigned to a managed care plan.

    PubMed

    McDonnell, Diana D; Graham, Carrie L

    2015-03-01

    In 2011 California began transitioning approximately 340,000 seniors and people with disabilities from Medicaid fee-for-service (FFS) to Medicaid managed care plans. When beneficiaries did not actively choose a managed care plan, the state assigned them to one using an algorithm based on their previous FFS primary and specialty care use. When no clear link could be established, beneficiaries were assigned by default to a managed care plan based on weighted randomization. In this article we report the results of a telephone survey of 1,521 seniors and people with disabilities enrolled in Medi-Cal (California Medicaid) and who were recently transitioned to a managed care plan. We found that 48 percent chose their own plan, 11 percent were assigned to a plan by algorithm, and 41 percent were assigned to a plan by default. People in the latter two categories reported being similarly less positive about their experiences compared to beneficiaries who actively chose a plan. Many states in addition to California are implementing mandatory transitions of Medicaid-only beneficiaries to managed care plans. Our results highlight the importance of encouraging beneficiaries to actively choose their health plan; when beneficiaries do not choose, states should employ robust intelligent assignment algorithms.

  5. The California Institute for Energy Efficiency multiyear research plan, 1992--1996

    SciTech Connect

    Not Available

    1992-07-01

    The mission of the California Institute for Energy Efficiency (CIEE) is to coordinate, plan, and implement a statewide program of medium- to long-term (five to fifteen years) applied research aimed at advancing the energy efficiency and productivity of all end-use sectors in California. The focus of CIEE's multiyear research and development (R D) program is to benefit California's ratepayers within the context of the state's energy, environmental, and economic needs and priorities. This context includes the current research efforts of CIEE's sponsors, of significant national R D organizations, and of industry. CIEE's 1992--1996 Multiyear Research Plan guides the Institute's research development, research management, and technology transfer efforts. The Plan briefly describes CIEE's current R D program and introduces potential R D initiatives that are responsive to California's unmet energy efficiency needs. In 1992, CIEE is planning, funding, and managing $5 million in multiyear research, exploratory research, Director's discretionary research, and technology transfer activities. The Institute's 1992 effort includes $3.6 million in multiyear research conducted in the Building Energy Efficiency, Air Quality Impacts of Energy Efficiency, and End-Use Resource Planning programs and $1 million in exploratory and Director's discretionary research. During the period 1992 to 1996, CIEE will continue to conduct energy efficiency R D that will secure sustainable, affordable energy for California while improving the state's economy and environment.

  6. Savannah River Site environmental implementation plan

    SciTech Connect

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  7. Savannah River Site Environmental Implementation Plan

    SciTech Connect

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  8. 75 FR 54031 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-03

    ...; Designation of Areas for Air Quality Planning Purposes; State of California; PM-10; Redesignation of the Coso Junction Planning Area to Attainment; Approval of PM-10 Maintenance Plan for the Coso Junction Planning... State of California's request to redesignate the Coso Junction planning area (CJPA) to attainment...

  9. The California Institute for Energy Efficiency multiyear research plan, 1992--1996

    SciTech Connect

    Not Available

    1992-07-01

    The mission of the California Institute for Energy Efficiency (CIEE) is to coordinate, plan, and implement a statewide program of medium- to long-term (five to fifteen years) applied research aimed at advancing the energy efficiency and productivity of all end-use sectors in California. The focus of CIEE`s multiyear research and development (R&D) program is to benefit California`s ratepayers within the context of the state`s energy, environmental, and economic needs and priorities. This context includes the current research efforts of CIEE`s sponsors, of significant national R&D organizations, and of industry. CIEE`s 1992--1996 Multiyear Research Plan guides the Institute`s research development, research management, and technology transfer efforts. The Plan briefly describes CIEE`s current R&D program and introduces potential R&D initiatives that are responsive to California`s unmet energy efficiency needs. In 1992, CIEE is planning, funding, and managing $5 million in multiyear research, exploratory research, Director`s discretionary research, and technology transfer activities. The Institute`s 1992 effort includes $3.6 million in multiyear research conducted in the Building Energy Efficiency, Air Quality Impacts of Energy Efficiency, and End-Use Resource Planning programs and $1 million in exploratory and Director`s discretionary research. During the period 1992 to 1996, CIEE will continue to conduct energy efficiency R&D that will secure sustainable, affordable energy for California while improving the state`s economy and environment.

  10. Chesapeake Bay Watershed Implementation Plans (WIPs)

    EPA Pesticide Factsheets

    This page provides an overview of Watershed Implementation Plans (WIP) and how they play an important role in restoring the Chesapeake Bay. The page also provides links to each jurisdiction's Phase I, II, and III WIP.

  11. A Structured Process for Implementing Strategic Planning.

    ERIC Educational Resources Information Center

    Goodin, Penny G.; Myers, William S.; Nichols, W. Randolph

    1998-01-01

    The Chesapeake (Virginia) Public Schools developed a strategic school-improvement plan with 178 recommendations representing certain goals: school safety, standards, effectiveness, efficiency, staff training, technology integration, community involvement, and facilities. The implementation process consisted of assigning responsibilities,…

  12. State Implementation Plan (SIP) Checklist Guide

    EPA Pesticide Factsheets

    Guidance documents and examples to assist air quality agencies of non-attainment areas in developing plans to implement national ambient air quality standards (NAAQS), including the ground-level ozone standard.

  13. Tactical Fuel and Energy Implementation Plan

    DTIC Science & Technology

    2010-09-24

    Technologies Corporation, in a briefing titled “ Software Modeling and Validation of a Microgrid ,” delivered to the Alternative Energy NOW Conference, Orlando...and Energy Implementation Plan 2 This plan is focused on the tactical environment, defined as maneuver brigade combat team (BCT) and below. The...Soldiers must clearly understand what is expected of them, and must know how to implement the new behaviors, once they have been defined

  14. SEPARATIONS AND WASTE FORMS CAMPAIGN IMPLEMENTATION PLAN

    SciTech Connect

    Vienna, John D.; Todd, Terry A.; Peterson, Mary E.

    2012-11-26

    This Separations and Waste Forms Campaign Implementation Plan provides summary level detail describing how the Campaign will achieve the objectives set-forth by the Fuel Cycle Reasearch and Development (FCRD) Program. This implementation plan will be maintained as a living document and will be updated as needed in response to changes or progress in separations and waste forms research and the FCRD Program priorities.

  15. State Plans for Implementing Programs of Study

    ERIC Educational Resources Information Center

    Lewis, Morgan V.; Overman, Laura

    2008-01-01

    This article examines how the states plan to implement the Programs of Study (POS) that were mandated by the 2006 reauthorization of the federal legislation for career and technical education. A coding system was developed for summarizing the methods described in the plans of all 50 states, the District of Columbia, Guam, and the Virgin Islands.…

  16. Coral Reef Protection Implementation Plan

    DTIC Science & Technology

    2007-11-02

    8217 Reprint (Orig + 2 copies) Z Technical Report (Orig + 2 copies) E] Manuscript (1 copy) " Final Progress Report (Orig + 2 copies) L’ Related Materials ...is and will continue take in the future to protect and conserve these unique to be, our policy to ensure safe and environmentally ecosystems. As...CZM plans. or fill material into waters of the United States. The Section 404(b)( I )guidelines. which are codified, set forth The delicate "pink

  17. Planning and Implementing Career Education Programs: Perspectives.

    ERIC Educational Resources Information Center

    Crim, Alonzo A.; And Others

    The collection of six papers offers perspectives on planning and implementing career education programs. The first paper, the Introduction (David Goodwin), deals with program implementation. The second paper, Priorities in Career Education (Alonzo A. Crim), describes the historical origins of career education in the Atlanta school system with a…

  18. Planning and Implementing a Global Studies Curriculum.

    ERIC Educational Resources Information Center

    Helmkamp, Caroline J.

    This report on the experimental Northeast Global Studies Middle Magnet School in Kansas City, Missouri, discusses the planning and implementation of a global studies curriculum to be implemented by the school. The 1990-1991 school year was the school's first as a magnet school under a consent decree issued by a federal judge. The decree was…

  19. 40 CFR 49.10046 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10046 Contents of implementation plan. The implementation plan for the Reservation of the Cow Creek Band of Umpqua Indians...

  20. 40 CFR 49.10046 - Contents of implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10046 Contents of implementation plan. The implementation plan for the Reservation of the Cow Creek Band of Umpqua Indians...

  1. 40 CFR 49.10046 - Contents of implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10046 Contents of implementation plan. The implementation plan for the Reservation of the Cow Creek Band of Umpqua Indians...

  2. 40 CFR 49.11076 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-Region X Implementation Plan for the Confederated Tribes of the Warm Springs Reservation of Oregon § 49.11076 Contents of implementation plan. The implementation plan for the Warm Springs Reservation...

  3. 40 CFR 49.11076 - Contents of implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-Region X Implementation Plan for the Confederated Tribes of the Warm Springs Reservation of Oregon § 49.11076 Contents of implementation plan. The implementation plan for the Warm Springs Reservation...

  4. 40 CFR 49.11076 - Contents of implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-Region X Implementation Plan for the Confederated Tribes of the Warm Springs Reservation of Oregon § 49.11076 Contents of implementation plan. The implementation plan for the Warm Springs Reservation...

  5. 40 CFR 49.10166 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-Region X Implementation Plan for the Jamestown S'klallam Tribe of Washington § 49.10166 Contents of implementation plan. The implementation plan for the Reservation of the Jamestown S'Klallam Tribe consists of...

  6. 40 CFR 49.10166 - Contents of implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-Region X Implementation Plan for the Jamestown S'klallam Tribe of Washington § 49.10166 Contents of implementation plan. The implementation plan for the Reservation of the Jamestown S'Klallam Tribe consists of...

  7. 40 CFR 49.10166 - Contents of implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-Region X Implementation Plan for the Jamestown S'klallam Tribe of Washington § 49.10166 Contents of implementation plan. The implementation plan for the Reservation of the Jamestown S'Klallam Tribe consists of...

  8. Waste generator services implementation plan

    SciTech Connect

    Mousseau, J.; Magleby, M.; Litus, M.

    1998-04-01

    Recurring waste management noncompliance problems have spurred a fundamental site-wide process revision to characterize and disposition wastes at the Idaho National Engineering and Environmental Laboratory. The reengineered method, termed Waste Generator Services, will streamline the waste acceptance process and provide waste generators comprehensive waste management services through a single, accountable organization to manage and disposition wastes in a timely, cost-effective, and compliant manner. This report outlines the strategy for implementing Waste Generator Services across the INEEL. It documents the culmination of efforts worked by the LMITCO Environmental Management Compliance Reengineering project team since October 1997. These efforts have included defining problems associated with the INEEL waste management process; identifying commercial best management practices; completing a review of DOE Complex-wide waste management training requirements; and involving others through an Integrated Process Team approach to provide recommendations on process flow, funding/charging mechanisms, and WGS organization. The report defines the work that will be performed by Waste Generator Services, the organization and resources, the waste acceptance process flow, the funding approach, methods for measuring performance, and the implementation schedule and approach. Field deployment will occur first at the Idaho Chemical Processing Plant in June 1998. Beginning in Fiscal Year 1999, Waste Generator Services will be deployed at the other major INEEL facilities in a phased approach, with implementation completed by March 1999.

  9. Oracle accrual plans from requirements to implementation

    SciTech Connect

    Rivera, Christine K

    2009-01-01

    Implementing any new business software can be an intimidating prospect and this paper is intended to offer some insight in to how to approach this challenge with some fundamental rules for success. Los Alamos National Laboratory (LANL) had undergone an original ERP implementation of HRMS, Oracle Advanced Benefits, Worker Self Service, Manager Self Service, Project Accounting, Financials and PO, and recently completed a project to implement Oracle Payroll, Time and Labor and Accrual Plans. This paper will describe some of the important lessons that can be applied to any implementation as a whole, and then specifically how this knowledge was applied to the design and deployment of Oracle Accrual Plans for LANL. Finally, detail on the functionality available in Oracle Accrual Plans will be described, as well as the detailed setups.that were utilized at LANL.

  10. California Community Colleges Technology II Strategic Plan, 2000-2005.

    ERIC Educational Resources Information Center

    California Community Colleges, Sacramento. Office of the Chancellor.

    This Strategic Plan aims to address the issues facing California Community Colleges (CCCs) due to new technology. The issues raised by the report include: (1) the pervasive and economically and socially necessary use of the Internet; (2) the digital divide; (3) the need for integrating technology into teaching and learning; (4) the impact of Tidal…

  11. Planning for a Better Future: California 2025. 2011 Update

    ERIC Educational Resources Information Center

    Public Policy Institute of California, 2011

    2011-01-01

    California's current economic and fiscal realities make nonpartisan, objective information on the state's future challenges all the more critical. Understandably, the search is on for immediate solutions to the unprecedented crises people face today. But if the present crises make policymakers shelve long-term planning, the result may be an even…

  12. California Master Plan for Special Education--An Update.

    ERIC Educational Resources Information Center

    Pillsbury, Charles A.; Maitland, Anne M.

    The report updates aspects of the 1977 report on California's Master Plan for Special Education. Reasons are sought for the intense debate over state funding for special education, which has substantially increased over recent years while special education enrollments have increased only modestly. In visits to nearly 100 local education agencies,…

  13. Evaluation of Integrated Planning Systems in California Community Colleges

    ERIC Educational Resources Information Center

    Buckley, Jerry L.; Piland, William E.

    2012-01-01

    California community colleges are experiencing unprecedented levels of sanctions from their accrediting agency. A survey of planners in these colleges reveals a wide gap between current practice and perceived importance of integrated planning practices, as well as misalignment in budgeting methods. Statistically significant gaps were identified…

  14. 76 FR 77178 - Approval and Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-12

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; New York State Ozone... Implementation Plan (SIP) for ozone concerning the control of volatile organic compounds. The proposed SIP... reductions that will help attain and maintain the national ambient air quality standards for ozone....

  15. NERSC Strategic Implementation Plan 2002-2006

    SciTech Connect

    Kramer, William; Bethel, Wes; Craw, James; Draney, Brent; Fortney, William; Gorda, Brend; Harris, William; Meyer, Nancy; Ng, Esmond; Verdier, Francesca; Walter, Howard; Welcome, Tammy

    2002-09-01

    This strategic proposal presents NERSC's vision for its activities and new directions over the next five years. NERSC's continuing commitment to providing high-end systems and comprehensive scientific support for its users will be enhanced, and these activities will be augmented by two new strategic thrusts: support for Scientific Challenge Teams and deployment of a Unified Science Environment. The proposal is in two volumes, the Strategic Plan and the Implementation Plan.

  16. California's disposal plan goes nowhere fast

    SciTech Connect

    Cohen, J.

    1994-02-18

    California desperately needs a place to store as much as 5.5 million cubic feet of low-level radioactive waste over the next 30 years. Ward Valley, a barren stretch of the Mojave Desert located some 250 miles east of Los Angeles, was supposed to be that place. Last year, trenches dug in the arid, seismically stable valley were supposed to be that place. Last year, trenches dug in the arid, seismically stable valley were supposed to begin holding wastes like the gadolinium-153 used to detect osteoporosis and the selenium-75 used to study proteins, as well as wastes from nuclear power plants. But construction crews haven't even begun to dig, because Ward Valley has become ground zero in the fierce national debate over radioactive waste disposal. Lawsuits filed by opponents, who fear the waste will contaminate the environment, and the intervention of influential politicians such as Sen. Barbara Boxer (D-CA) have blocked the Interior Department from selling the federally owned Ward Valley land to California to begin construction. As a result, universities, biotechnology companies, and hospitals may be stuck with wastes piling up at their institutions, which could have repercussions.

  17. 40 CFR 209.10 - Approval of plan, implementation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Approval of plan, implementation. (a) If the Administrator finds that the remedial plan is designed to... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Approval of plan, implementation. 209... implementation of the approved plan upon receipt of notice from the Administrator that the remedial plan has...

  18. Enterprise Resource Planning Implementation in Higher Education

    ERIC Educational Resources Information Center

    Graham, James F.

    2009-01-01

    Enterprise resource planning (ERP) implementation projects are unique to each institution and yet are expensive, time consuming, and result in change across the institution. Five Midwest public and private 4-year higher education institutions were studied to determine the impact of five specific key factors on the overall success of the ERP…

  19. How to Plan and Implement a Workshop.

    ERIC Educational Resources Information Center

    Howell, Jacquie

    These guidelines were developed to assist school administrators who have the responsibility of organizing a one- to three-day professional development program. The first section outlines the tasks involved in planning and implementing a workshop. The remaining sections cover the following: (1) developing and utilizing the workshop theme; (2)…

  20. Marketing Internships: A Planning and Implementation Guide.

    ERIC Educational Resources Information Center

    Faught, Suzanne G.

    This planning and implementation guide is designed to assist marketing educators and others supportive of marketing education. It begins with definitions of vocabulary of related terminology and descriptions of the four models of internships presented in the guide: full-year, rotation-type format; 1-semester, rotation-type format; full-year format…

  1. NASA Education Implementation Plan 2015-2017

    ERIC Educational Resources Information Center

    National Aeronautics and Space Administration, 2015

    2015-01-01

    The NASA Education Implementation Plan (NEIP) provides an understanding of the role of NASA in advancing the nation's STEM education and workforce pipeline. The document outlines the roles and responsibilities that NASA Education has in approaching and achieving the agency's and administration's strategic goals in STEM Education. The specific…

  2. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... economic development standards of this subpart. (b) Proposed funded project or activity. The project or activity proposed in the implementation plan is subject to the following requirements: (1) The Federal... of 1970 (URA) (42 U.S.C. 4601 et seq.); (4) The environmental review and approval requirements of...

  3. Hanford Environmental Management Program implementation plan

    SciTech Connect

    Not Available

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs.

  4. 78 FR 69625 - Approval and Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-20

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION... Implementation Plan Revision AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: The Environmental Protection Agency (EPA) is proposing to approve a revision to the New York State...

  5. Interim Land Use Control Implementation Plan

    NASA Technical Reports Server (NTRS)

    Applegate, Joseph L.

    2014-01-01

    This Interim Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Kennedy Space Center (KSC) Contractors Road Heavy Equipment (CRHE) Area (SWMU 055; "the Site") of institutional controls that have been implemented at the Site1. Although there are no current unacceptable risks to human health or the environment associated with the CRHE Area, an interim institutional land use control (LUC) is necessary to prevent human health exposure to volatile organic compound (VOC)-affected groundwater at the Site. Controls will include periodic inspection, condition certification, and agency notification.

  6. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 3 2013-10-01 2013-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  7. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 3 2014-10-01 2014-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  8. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  9. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 3 2012-10-01 2012-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  10. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 3 2011-10-01 2011-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  11. Factors Affecting Implementation of the California Childhood Obesity Research Demonstration (CA-CORD) Project, 2013

    PubMed Central

    Brunner, Julian; Moody, Jamie; Ibarra, Leticia; Hoyt, Helina; McKenzie, Thomas L.; Binggeli-Vallarta, Amy; Cervantes, Griselda; Finlayson, Tracy L.; Ayala, Guadalupe X.

    2016-01-01

    Introduction Ecological approaches to health behavior change require effective engagement from and coordination of activities among diverse community stakeholders. We identified facilitators of and barriers to implementation experienced by project leaders and key stakeholders involved in the Imperial County, California, Childhood Obesity Research Demonstration project, a multilevel, multisector intervention to prevent and control childhood obesity. Methods A total of 74 semistructured interviews were conducted with project leaders (n = 6) and key stakeholders (n = 68) representing multiple levels of influence in the health care, early care and education, and school sectors. Interviews, informed by the Multilevel Implementation Framework, were conducted in 2013, approximately 12 months after year-one project implementation, and were transcribed, coded, and summarized. Results Respondents emphasized the importance of engaging parents and of ensuring support from senior leaders of participating organizations. In schools, obtaining teacher buy-in was described as particularly important, given lower perceived compatibility of the intervention with organizational priorities. From a program planning perspective, key facilitators of implementation in all 3 sectors included taking a participatory approach to the development of program materials, gradually introducing intervention activities, and minimizing staff burden. Barriers to implementation were staff turnover, limited local control over food provided by external vendors or school district policies, and limited availability of supportive resources within the broader community. Conclusion Project leaders and stakeholders in all sectors reported similar facilitators of and barriers to implementation, suggesting the possibility for synergy in intervention planning efforts. PMID:27763831

  12. Tactical Fuel and Energy Implementation Plan

    DTIC Science & Technology

    2010-09-24

    Software Modeling and Validation of a Microgrid ,” delivered to the Alternative Energy NOW Conference, Orlando, FL, 9 February 2010. 34Ibid. 35...This plan is focused on the tactical environment, defined as maneuver brigade combat team (BCT) and below. The study team developed the objectives...what is expected of them, and must know how to implement the new behaviors, once they have been defined . Education is essential in establishing

  13. Gen IV Materials Handbook Implementation Plan

    SciTech Connect

    Rittenhouse, P.; Ren, W.

    2005-03-29

    A Gen IV Materials Handbook is being developed to provide an authoritative single source of highly qualified structural materials information and materials properties data for use in design and analyses of all Generation IV Reactor Systems. The Handbook will be responsive to the needs expressed by all of the principal government, national laboratory, and private company stakeholders of Gen IV Reactor Systems. The Gen IV Materials Handbook Implementation Plan provided here addresses the purpose, rationale, attributes, and benefits of the Handbook and will detail its content, format, quality assurance, applicability, and access. Structural materials, both metallic and ceramic, for all Gen IV reactor types currently supported by the Department of Energy (DOE) will be included in the Gen IV Materials Handbook. However, initial emphasis will be on materials for the Very High Temperature Reactor (VHTR). Descriptive information (e.g., chemical composition and applicable technical specifications and codes) will be provided for each material along with an extensive presentation of mechanical and physical property data including consideration of temperature, irradiation, environment, etc. effects on properties. Access to the Gen IV Materials Handbook will be internet-based with appropriate levels of control. Information and data in the Handbook will be configured to allow search by material classes, specific materials, specific information or property class, specific property, data parameters, and individual data points identified with materials parameters, test conditions, and data source. Details on all of these as well as proposed applicability and consideration of data quality classes are provided in the Implementation Plan. Website development for the Handbook is divided into six phases including (1) detailed product analysis and specification, (2) simulation and design, (3) implementation and testing, (4) product release, (5) project/product evaluation, and (6) product

  14. 40 CFR 49.9866 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9866 Contents of implementation plan. The implementation plan for the Reservation of the Burns Paiute Indian Colony consists of...) Section 49.131General rule for open burning. (h) Section 49.135Rule for emissions detrimental to...

  15. 40 CFR 49.9866 - Contents of implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9866 Contents of implementation plan. The implementation plan for the Reservation of the Burns Paiute Indian Colony consists of...) Section 49.131General rule for open burning. (h) Section 49.135Rule for emissions detrimental to...

  16. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 9 2012-10-01 2012-10-01 false Aircraft Operator Implementation Plan. 1560.109... Collection and Transmission of Secure Flight Passenger Data for Watch List Matching § 1560.109 Aircraft Operator Implementation Plan. (a) Content of the Aircraft Operator Implementation Plan (AOIP). Each...

  17. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Aircraft Operator Implementation Plan. 1560.109... Collection and Transmission of Secure Flight Passenger Data for Watch List Matching § 1560.109 Aircraft Operator Implementation Plan. (a) Content of the Aircraft Operator Implementation Plan (AOIP). Each...

  18. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 9 2014-10-01 2014-10-01 false Aircraft Operator Implementation Plan. 1560.109... Collection and Transmission of Secure Flight Passenger Data for Watch List Matching § 1560.109 Aircraft Operator Implementation Plan. (a) Content of the Aircraft Operator Implementation Plan (AOIP). Each...

  19. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 9 2013-10-01 2013-10-01 false Aircraft Operator Implementation Plan. 1560.109... Collection and Transmission of Secure Flight Passenger Data for Watch List Matching § 1560.109 Aircraft Operator Implementation Plan. (a) Content of the Aircraft Operator Implementation Plan (AOIP). Each...

  20. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 9 2011-10-01 2011-10-01 false Aircraft Operator Implementation Plan. 1560.109... Collection and Transmission of Secure Flight Passenger Data for Watch List Matching § 1560.109 Aircraft Operator Implementation Plan. (a) Content of the Aircraft Operator Implementation Plan (AOIP). Each...

  1. F-16 Implementation and Management. Plan Report.

    DTIC Science & Technology

    1981-03-01

    JXPK1R - .EELOPMENT RER6-.Jio. 18 ,v MARCH, -1" Prepared in fulfillment of CDRL nos. B028, B029, B030, B033, B050, B057, B059 II LECTEI by S JUNO 8...implementation and management plan report (F-16 Development Report No. 18 ). San Diego, Calif.: Courseware, Inc., October 1978, March 1981. Sudweeks...Instruction .............. 17 v . E . CONTENTS (Cont.) Page 3.4 Student Training and Measurement ......... 18 3.4.1 Academic events .............. 18 3.4.2

  2. 76 FR 11193 - Sequoia National Forest; California; Piute Mountains Travel Management Plan; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-01

    ...; ] DEPARTMENT OF AGRICULTURE Forest Service Sequoia National Forest; California; Piute Mountains Travel... for the Piute Mountains Travel Management Plan. FOR FURTHER INFORMATION CONTACT: Warren L. Niemi,...

  3. Implementing Manufacturing Resources Planning for Marine Corps

    DTIC Science & Technology

    1989-06-01

    business planning , production planning, master production planning, capacity requirements planning, and the execution support systems for capacity and...during the following discussion. [Refs. 7 and 131 General business planning sets the overall objectives for the manufacturing concern. The overall...materials plan then generates a set of purchasing and manufacturing requirements that are necessary 57 BUSINESS PLANNING OBJECTIVES MARKETING PLANNING

  4. Environmental Restoration Quality Program Implementation Plan

    SciTech Connect

    Not Available

    1992-08-01

    The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

  5. Implementation Issues for Departure Planning Systems

    NASA Technical Reports Server (NTRS)

    Hansman, R. John; Feron, Eric; Clarke, John-Paul; Odoni, Amedeo

    1999-01-01

    The objective of the proposed effort is to investigate issues associated with the design and implementation of decision aiding tools to assist in improving the departure process at congested airports. This effort follows a preliminary investigation of potential Departure Planning approaches and strategies, which identified potential benefits in departure efficiency, and also in reducing the environmental impact of aircraft in the departure queue. The preliminary study bas based, in large part, on observations and analysis of departure processes at Boston, Logan airport. The objective of this follow-on effort is to address key implementation issues and to expand the observational base to include airports with different constraints and traffic demand. Specifically, the objectives of this research are to: (1) Expand the observational base to include airports with different underlying operational dynamics. (2) Develop prototype decision aiding algorithms/approaches and assess potential benefits. and (3) Investigate Human Machine Integration (HMI) issues associated with decision aids in tower environments.

  6. Implementing LCFF: Communicating about District Plans. Policy and Practice Brief

    ERIC Educational Resources Information Center

    Knudson, Joel

    2016-01-01

    California educators continue in their struggle to communicate district plans to parents, teachers, and other members of the school community. Local Control Accountability Plans (LCAPs), have ballooned into jargon-laden stacks of tables, impenetrable to all but the most sophisticated reader. Envisioned as a tool to improve transparency, the LCAP…

  7. WHC natural phenomena hazards mitigation implementation plan

    SciTech Connect

    Conrads, T.J.

    1996-09-11

    Natural phenomena hazards (NPH) are unexpected acts of nature which pose a threat or danger to workers, the public or to the environment. Earthquakes, extreme winds (hurricane and tornado),snow, flooding, volcanic ashfall, and lightning strike are examples of NPH at Hanford. It is the policy of U.S. Department of Energy (DOE) to design, construct and operate DOE facilitiesso that workers, the public and the environment are protected from NPH and other hazards. During 1993 DOE, Richland Operations Office (RL) transmitted DOE Order 5480.28, ``Natural Phenomena Hazards Mitigation,`` to Westinghouse Hanford COmpany (WHC) for compliance. The Order includes rigorous new NPH criteria for the design of new DOE facilities as well as for the evaluation and upgrade of existing DOE facilities. In 1995 DOE issued Order 420.1, ``Facility Safety`` which contains the same NPH requirements and invokes the same applicable standards as Order 5480.28. It will supersede Order 5480.28 when an in-force date for Order 420.1 is established through contract revision. Activities will be planned and accomplished in four phases: Mobilization; Prioritization; Evaluation; and Upgrade. The basis for the graded approach is the designation of facilities/structures into one of five performance categories based upon safety function, mission and cost. This Implementation Plan develops the program for the Prioritization Phase, as well as an overall strategy for the implemention of DOE Order 5480.2B.

  8. Access and Equity: California Master Plan for Higher Education and Disadvantaged Student Success

    ERIC Educational Resources Information Center

    Davis, Kevin P.

    2015-01-01

    The California Master Plan for Higher Education sets a policy objective of equity through access to higher education. The California State University system is California's primary institution for providing the social mobility that accompanies a four-year college degree. The purpose of this study is to examine the education lifecycle outcomes for…

  9. 78 FR 66058 - Habitat Conservation Plan for South Sacramento County, California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-04

    ... Fish and Wildlife Service ; Habitat Conservation Plan for South Sacramento County, California AGENCY... Policy Act and the California Environmental Quality Act for the proposed South Sacramento Habitat... Environmental Policy Act and the California Environmental Quality Act for the proposed South Sacramento...

  10. Science operations planning and implementation for Rosetta

    NASA Astrophysics Data System (ADS)

    Koschny, Detlef; Sweeney, Mark; Montagon, Elsa; Hoofs, Raymond; van der Plas, Peter

    2002-07-01

    The Rosetta mission is a cornerstone mission of the Horizon 2000 programme of the European Space Agency. It will be launched to comet 46P/Wirtanen in January 2003. This mission is the first of a series of planetary missions, including Mars Express, Smart-I (to the Moon), and BepiColombo (to Mercury). All these missions have similar requirements for their scientific operations. The Experiments H/W and S/W are developed by Principal Investigators, working at scientific institutes. They are also responsible for the operation of their experiments and for the generation of related operational documentation. The Science Operations Centre (SOC) has the task to consolidate the inputs of the different experimenters and the Lander and ensure that the resulting science operations timeline is free of conflicts. It forwards this timeline to the Mission Operations Centre (MOC) which combines the science operations with the operations of the other spacecraft subsystems and the orbit and attitude of the spacecraft. The MOC is also responsible for uplinking the operational command sequences to the spacecraft and for returning the received telemetry to the user. In a collaboration between the team of the Rosetta Project Scientist at the Research and Science Support Department of ESA/ESTEC and the European Space Operations Centre (ESA/ESOC), a concept for the SOC/MOC and their interfaces was developed for the Rosetta mission. This concept is generic enough to allow its implementation also for the other planetary missions. The design phase is now complete, and implementation is on-going. This paper briefly presents the architecture of the complex ground segment, concentrating on the elements required for planning of scientific operations, and then details the software tools EPS (Experiment Planning System) and PTB (Project Test Bed) which are used in the planning process.

  11. 78 FR 59261 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-26

    ... redesignate the Sacramento nonattainment area to attainment for the 24- hour particulate matter of ten microns... proposing to approve California's ten-year ozone maintenance plan for the area, the MVEBs, and the...

  12. 75 FR 29897 - Approval and Promulgation of Implementation Plans; New York State Implementation Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-28

    .... What is the history and time frame for State Implementation Plan (SIP) submissions? II. What was... is EPA's conclusion? V. Statutory and Executive Order Reviews I. What is the history and time frame... Container Spillage Control.'' The intended effect of this action is to approve control strategies,...

  13. 77 FR 13974 - Approval and Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-08

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; New York State Ozone... (SIP) for ozone concerning the control of volatile organic compounds. The proposed SIP revision... will help attain and maintain the national ambient air quality standards for ozone. DATES:...

  14. Administrator's Guide to Technology: Planning, Funding & Implementation.

    ERIC Educational Resources Information Center

    Aspen Education Development Group, Gaithersburg, MD.

    This document provides guidelines for administrators related to instructional technology and planning. Chapter 1 discusses planning, including developing a technology plan, facility assessment, e-rate planning, formation of a technology committee, budget planning, and hardware/software replacement plan and costs. Chapter 2 addresses…

  15. Solid Waste Assurance Program Implementation Plan

    SciTech Connect

    Irons, L.G.

    1995-06-19

    On June 6, 1995, a waiver to Hanford Site Solid Waste Acceptance Criteria, was approved by the US Department of Energy Richland Operations Office (RL) to replace the low-level, mixed, and transuranic (TRU) generator assessment programs with the Solid Waste Assurance Program (SWAP). This is associated with a waiver that was approved on March 16, 1995 to replace the Storage/Disposal Approval Record (SDAR) requirements with the Waste Specification System (WSS). This implementation plan and the SWAP applies to Solid Waste Disposal (SWD) functions, facilities, and personnel who perform waste acceptance, verification, receipt, and management functions of dangerous, radioactive, and mixed waste from on- and off-site generators who ship to or within the Hanford Site for treatment, storage, and/or disposal (TSD) at SWD TSD facilities.

  16. 76 FR 9537 - Sequoia National Forest; California; Piute Mountains Travel Management Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-18

    ... Forest Service Sequoia National Forest; California; Piute Mountains Travel Management Plan AGENCY: Forest... National Forest proposes to develop a travel management plan for the Piute Mountains, located in northeast Kern County, California. The Piute Mountains, with a mixed conifer and pine forest, are included in...

  17. A Report on Health Sciences Education Planning for California: 1980-1982.

    ERIC Educational Resources Information Center

    California State Postsecondary Education Commission, Sacramento.

    Health sciences education planning for California for 1980-82 is examined. The adequacy of educational programs in meeting the needs of California for professional personnel in medicine, nursing, dentistry, pharmacy, and optometry is assessed. Data on enrollments and graduation rates in these fields are updated from the 1978 plan, and similar data…

  18. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  19. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  20. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  1. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  2. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  3. 12 CFR 1291.3 - AHP Implementation Plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AHP Implementation Plan without first consulting its Advisory Council. The Bank's board of directors...) Advisory Council review. Prior to the amendment of a Bank's AHP Implementation Plan, the Bank shall provide... recommendations to the Bank's board of directors for its consideration. (c) Notification of Plan amendments to...

  4. 40 CFR 49.9926 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes-Region X Implementation Plan for the Coeur D'alene Tribe of the Coeur D'alene Reservation, Idaho § 49.9926 Contents...

  5. Getting Started: Planning and Implementing Computer Instruction in Schools.

    ERIC Educational Resources Information Center

    Mojkowski, Charles

    Intended for use by local school district staff, this manual provides step-by-step guidelines for planning and implementing the incorporation of computer-based instruction in the curriculum. Procedures involved in five phases of planning and implementation are outlined, covering: (1) preliminary planning, where schools should establish planning…

  6. 76 FR 33651 - Approval and Promulgation of Implementation Plans; ID

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-09

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; ID AGENCY: Environmental... Implementation Plan (SIP) that were submitted to EPA by the State of Idaho on April 16, 2007. This SIP submittal... through 668. Sec. 52.670 Identification of plan. * * * * * (c) * * * EPA-Approved Idaho Regulations...

  7. 77 FR 24160 - Revisions to the Hawaii State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-23

    ... AGENCY 40 CFR Part 52 Revisions to the Hawaii State Implementation Plan AGENCY: Environmental Protection... Implementation Plan (SIP). These revisions would update and replace the minor new source review rules that EPA... not plan to open a second comment period, so anyone interested in commenting should do so at this...

  8. 77 FR 25111 - Revisions to the Hawaii State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-27

    ... AGENCY 40 CFR Part 52 Revisions to the Hawaii State Implementation Plan AGENCY: Environmental Protection... Implementation Plan (SIP). These revisions concern volatile organic compound (VOC), oxides of nitrogen (NO X... not plan to open a second comment period, so anyone interested in commenting should do so at this...

  9. 77 FR 51619 - Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-24

    ... Implementation Plan for Implementing Best Available Retrofit Technology for Four Corners Power Plant: Navajo... for Implementing Best Available Retrofit Technology for Four Corners Power Plant: Navajo Nation AGENCY... promulgating a source-specific Federal Implementation Plan (FIP) requiring the Four Corners Power Plant...

  10. Implementation of Discharge Plans for Chronically Ill Elders Discharged Home.

    ERIC Educational Resources Information Center

    Proctor, Enola K.; And Others

    1996-01-01

    Addresses the extent to which discharge plans for elderly patients with congestive heart failure were implemented as planned, tested the consequences of implementation problems, and identified factors associated with implementation problems. Implications for hospital discharge planners and home health care are discussed. (KW)

  11. Implementing the Common Core State Standards in California

    ERIC Educational Resources Information Center

    Warren, Paul; Murphy, Patrick

    2014-01-01

    The Common Core State Standards (CCSS)--adopted in 2010--are similar to California's current K-12 standards, but their emphasis on conceptual understanding and problem solving will require changes in classroom instruction. California's transition to the CCSS has gotten off to a slow start. Survey data suggest that many teachers will deliver the…

  12. Dismantling Bilingual Education Implementing English Immersion: The California Initiative.

    ERIC Educational Resources Information Center

    Rossell, Christine H.

    This study explored bilingual education in California, analyzing California law on instruction for English Learners before and after Proposition 227. Proposition 227 required that all English Learners (EL) participate in a sheltered English immersion program in which most instruction was in English with curriculum and presentation designed for…

  13. A Study of California Public School District Superintendents and Their Implementation of 21st Century Skills

    ERIC Educational Resources Information Center

    Gittisriboongul, Patrick

    2013-01-01

    The purpose of this study was to identify the strategies, practices, and leadership skills utilized by California superintendents in implementing 21st-century skills in their respective districts. A mixed-methods design was used, combining qualitative and quantitative analysis. Quantitative data from 37 California superintendents were collected…

  14. Implementation planning for industrial energy conservation: approach and methodology

    SciTech Connect

    Alston, T.G.; Falk, G.; Grogan, P.J.; Katz, D.; Tatar, J.

    1981-01-01

    Details of an industry-specific Conservation Technology Implementation Branch implementation plan is described in detail. CTIB has conducted implementation planning in the steel, pulp/paper, and agriculture/food processing industries, but in FY 1981, CTIB plans to conduct planning for the chemicals, petroleum refining, aluminum, glass, cement, and textile industries. Guidelines are presented for each contractor for each industry toward a common methodology in terms of approach, areas of analysis, assumptions, and reporting. The major parts of the CTIB plan are: an implementation study consisting of technology selection, market demand analysis, and policy analysis, and a plan consisting of a detailed description and schedule of future CTIB actions, followed by a recommended system for monitoring market results when the plan is implemented. (MCW)

  15. Easing the Transition: How to Implement an Automated Succession Plan.

    ERIC Educational Resources Information Center

    Andrews, Jean P.

    1989-01-01

    An automated succession plan can create smooth transitions when employees transfer or leave the company. It can also boost productivity and employee morale. (Includes a basic nine-step implementation plan that makes the process easy and relatively painless.) (JOW)

  16. 40 CFR 93.124 - Using the motor vehicle emissions budget in the applicable implementation plan (or implementation...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... budget in the applicable implementation plan (or implementation plan submission). 93.124 Section 93.124... implementation plan (or implementation plan submission) with respect to its motor vehicle emissions budget(s... MPO may not interpret the budget to be higher than the implementation plan's estimate of...

  17. 40 CFR 93.124 - Using the motor vehicle emissions budget in the applicable implementation plan (or implementation...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... budget in the applicable implementation plan (or implementation plan submission). 93.124 Section 93.124... implementation plan (or implementation plan submission) with respect to its motor vehicle emissions budget(s... MPO may not interpret the budget to be higher than the implementation plan's estimate of...

  18. California hospital networks are narrower in Marketplace than in commercial plans, but access and quality are similar.

    PubMed

    Haeder, Simon F; Weimer, David L; Mukamel, Dana B

    2015-05-01

    Do insurance plans offered through the Marketplace implemented by the State of California under the Affordable Care Act restrict consumers' access to hospitals relative to plans offered on the commercial market? And are the hospitals included in Marketplace networks of lower quality compared to those included in the commercial plans? To answer these questions, we analyzed differences in hospital networks across similar plan types offered both in the Marketplace and commercially, by region and insurer. We found that the common belief that Marketplace plans have narrower networks than their commercial counterparts appears empirically valid. However, there does not appear to be a substantive difference in geographic access as measured by the percentage of people residing in at least one hospital market area. More surprisingly, depending on the measure of hospital quality employed, the Marketplace plans have networks with comparable or even higher average quality than the networks of their commercial counterparts.

  19. The role of community context in planning and implementing community-based health promotion projects.

    PubMed

    Kegler, Michelle C; Rigler, Jessica; Honeycutt, Sally

    2011-08-01

    The current study examines how community context affected collaborative planning and implementation in eight sites participating in a healthy cities and communities initiative in California. Data are from 23 focus groups conducted with coalition members, and 76 semi-structured interviews with local coordinators and community leaders. Multiple case study methods were used to identify major themes related to how five contextual domains influenced collaborative planning and implementation. Results showed that history of collaboration can influence resources and interpersonal and organizational connections available for planning and implementation, as well as priorities selected for action. Community politics and history can affect which segments of the community participate in a planning process and what issues are prioritized, as well as the pool of partners willing to aid in implementation. Some community norms and values bring people together and others appear to limit involvement from certain groups. Community demographics and economic conditions may shape outreach strategies for planning and implementation, and may also shape priorities. Geography can play a role in assessment methods, priority selection, partners available to aid in implementation, and participation in activities and events. Results suggest that community context plays a substantive role in shaping how community-based health promotion projects unfold.

  20. 40 CFR 49.9956 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... detrimental to public health or welfare. (k) Section 49.137Rule for air pollution episodes. (l) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (m) Section 49... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan...

  1. 40 CFR 49.9896 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  2. 40 CFR 49.9986 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... for emissions detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan...

  3. 40 CFR 49.9926 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Coeur D'alene Tribe of the Coeur D'alene Reservation, Idaho § 49.9926 Contents of...

  4. 40 CFR 49.9866 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan...

  5. 40 CFR 93.151 - State implementation plan (SIP) revision.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false State implementation plan (SIP... implementation plan (SIP) revision. The provisions and requirements of this subpart to demonstrate conformity... nonattainment and maintenance areas where EPA has not approved the General Conformity SIP revision allowed...

  6. 40 CFR 93.151 - State implementation plan (SIP) revision.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false State implementation plan (SIP... implementation plan (SIP) revision. The provisions and requirements of this subpart to demonstrate conformity... nonattainment and maintenance areas where EPA has not approved the General Conformity SIP revision allowed...

  7. 40 CFR 93.151 - State implementation plan (SIP) revision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false State implementation plan (SIP... implementation plan (SIP) revision. The Federal conformity rules under this subpart, in addition to any existing... requirements until such time as the required conformity SIP revision is approved by EPA. A State's...

  8. 40 CFR 93.151 - State implementation plan (SIP) revision.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false State implementation plan (SIP... implementation plan (SIP) revision. The provisions and requirements of this subpart to demonstrate conformity... nonattainment and maintenance areas where EPA has not approved the General Conformity SIP revision allowed...

  9. 40 CFR 93.151 - State implementation plan (SIP) revision.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true State implementation plan (SIP... implementation plan (SIP) revision. The provisions and requirements of this subpart to demonstrate conformity... nonattainment and maintenance areas where EPA has not approved the General Conformity SIP revision allowed...

  10. 40 CFR 49.10526 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Contents of implementation plan. The implementation plan for the lands in trust that are within the... detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section...

  11. 76 FR 31973 - Draft WaterSMART Strategic Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-02

    ... Draft WaterSMART Strategic Implementation Plan AGENCY: Office of the Assistant Secretary for Water and Science, Interior. ACTION: Notice of availability. SUMMARY: The Department of the Interior's draft Water... Strategic Implementation Plan) identifies activities that will be undertaken to secure and stretch...

  12. Westinghouse Hanford Company Pollution Prevention Program Implementation Plan

    SciTech Connect

    Floyd, B.C.

    1994-10-01

    This plan documents Westinghouse Hanford Company`s (WHC) Pollution Prevention (P2) (formerly Waste Minimization) program. The program includes WHC; BCS Richland, Inc. (BCSR); and ICF Kaiser Hanford Company (ICF KH). The plan specifies P2 program activities and schedules for implementing the Hanford Site Waste Minimization and Pollution Prevention Awareness (WMin/P2) Program Plan requirements (DOE 1994a). It is intended to satisfy the U.S. Department of Energy (DOE) and other legal requirements that are discussed in both the Hanford Site WMin/P2 plan and paragraph C of this plan. As such, the Pollution Prevention Awareness Program required by DOE Order 5400.1 (DOE 1988) is included in the WHC P2 program. WHC, BCSR, and ICF KH are committed to implementing an effective P2 program as identified in the Hanford Site WMin/P2 Plan. This plan provides specific information on how the WHC P2 program will develop and implement the goals, activities, and budget needed to accomplish this. The emphasis has been to provide detailed planning of the WHC P2 program activities over the next 3 years. The plan will guide the development and implementation of the program. The plan also provides background information on past program activities. Because the plan contains greater detail than in the past, activity scope and implementation schedules may change as new priorities are identified and new approaches are developed and realized. Some activities will be accelerated, others may be delayed; however, all of the general program elements identified in this plan and contractor requirements identified in the Site WMin/P2 plan will be developed and implemented during the next 3 years. This plan applies to all WHC, BCSR, and ICF KH organizations and subcontractors. It will be distributed to those with defined responsibilities in this plan; and the policy, goals, objectives, and strategy of the program will be communicated to all WHC, BCSR, and ICF KH employees.

  13. Assessment of levels of hospice care coverage offered to commercial managed care plan members in California: implications for the California Health Insurance Exchange.

    PubMed

    Chung, Kyusuk; Jahng, Joelle; Petrosyan, Syuzanna; Kim, Soo In; Yim, Victoria

    2015-06-01

    The implementation of the Affordable Care Act that provides for the expansion of affordable insurance to uninsured individuals and small businesses, coupled with the provision of mandated hospice coverage, is expected to increase the enrollment of the terminally ill younger population in hospice care. We surveyed health insurance companies that offer managed care plans in the 2014 California health insurance exchange and large hospice agencies that provided hospice care to privately insured patients in 2011. Compared with Medicare and Medicaid hospice benefits, hospice benefits for privately insured patients, particularly those enrolled in managed care plans, varied widely. Mandating hospice care alone may not be sufficient to ensure that individuals enrolled in different managed care plans receive the same level of coverage.

  14. SPECIAL PROBLEM REPORT, IMPROVING EXTENSION PROGRAM PLANNING PROCEDURES IN SAN LUIS OBISPO COUNTY, CALIFORNIA.

    ERIC Educational Resources Information Center

    CANNON, DALE CARTER

    A SURVEY WAS CONDUCTED BY MAIL QUESTIONNAIRE TO GATHER DATA ON THE FARM POPULATION OF SAN LUIS OBISPO COUNTY, CALIFORNIA, TO GET NAMES OF COMMUNITY LEADERS, AND PROVIDE MOTIVATION FOR EXTENSION PROGRAM PLANNING. THE MEAN AGE OF RESPONDENTS WAS 50, THE LARGE MAJORITY WITH CHILDREN AT HOME, THREE-FOURTHS NATIVE TO CALIFORNIA, ONE-HALF BEING BORN IN…

  15. 78 FR 16827 - Designation of Areas for Air Quality Planning Purposes; State of California; Imperial Valley...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-19

    ... AGENCY 40 CFR Part 81 Designation of Areas for Air Quality Planning Purposes; State of California; Imperial Valley Planning Area for PM 10 Clarification of Nonattainment Area Boundary AGENCY: Environmental... Imperial Valley planning area, an area designated as nonattainment for the national ambient air...

  16. 78 FR 70012 - Lake Tahoe Basin Management Unit, California, Land Management Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-22

    ... Forest Service Lake Tahoe Basin Management Unit, California, Land Management Plan Revision AGENCY: Lake... Management Unit (LTBMU) Land Management Plan Revision available for the 60-day pre-decisional objection... Record of Decision for the Lake Tahoe Basin Management Unit (LTBMU) Land Management Plan...

  17. 77 FR 476 - Endangered and Threatened Species; Recovery Plan Southern Oregon/Northern California Coast Coho...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-05

    ... Plan Southern Oregon/ Northern California Coast Coho Salmon Evolutionarily Significant Unit AGENCY... Salmon (Oncorhynchus kisutch) Evolutionarily Significant Unit (ESU). NMFS is soliciting review and... Fisheries Service, 1655 Heindon Road, Arcata, CA 95521, Attn: Recovery Coordinator/SONCC Coho Salmon...

  18. 75 FR 67682 - Sequoia National Forest, California; Sequoia National Forest Plan Amendment, Giant Sequoia...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-03

    ...; ] DEPARTMENT OF AGRICULTURE Forest Service Sequoia National Forest, California; Sequoia National Forest Plan Amendment, Giant Sequoia National Monument Draft Environmental Impact Statement, Comprehensive Management...: Comments must be received no later than December 3, 2010. SUMMARY: The Sequoia National Forest hereby...

  19. Savannah River Site environmental implementation plan. Volume 1, Executive summary

    SciTech Connect

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  20. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    SciTech Connect

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  1. The California Conservation Corps: A Report on Implementation.

    ERIC Educational Resources Information Center

    Lah, David; Wolf, Wendy C.

    The California Conservation Corps (CCC), an amalgam of residential and non-residential centers, was established in 1977. It was designed to accomplish useful work for natural resource agencies and help youth between the ages of 18 and 23 develop a mature work attitude and the ability to function cooperatively as they live and work together. Based…

  2. Implementing California's Regulations on Conflict of Interest in Research.

    ERIC Educational Resources Information Center

    Seligman, Richard P.

    1989-01-01

    Origins of the University of California's procedures for systematic review of principal investigators' financial disclosures prior to acceptance of grants, and the manner in which they are working at present, are examined. The disclosure requirements, faculty committee, criteria, and disclosures made during 1988 are described. Two case studies are…

  3. Implementing Common Core State Standards in California: A Report from the Field

    ERIC Educational Resources Information Center

    McLaughlin, Milbrey; Glaab, Laura; Carrasco, Isabel Hilliger

    2014-01-01

    In this report, the authors present some initial findings on the early implementation of Common Core State Standards (CCSS) in California. They report on their interviews with educators in all regions of the state, and on their views of how implementation is proceeding in their schools and districts. The authors then review some of the key…

  4. Common Core Implementation in California: A Snapshot of Districts' Progress. CenterView

    ERIC Educational Resources Information Center

    Center for the Future of Teaching and Learning at WestEd, 2016

    2016-01-01

    It has been six years since California adopted the Common Core State Standards (CCSS). District leaders have been busy building capacity and developing infrastructure to support effective CCSS implementation, while teachers have been working hard to implement standards-aligned instruction that supports academic success for all students. In a state…

  5. Implementing a strategic recruitment and retention plan.

    PubMed

    Smeltzer, C H; Tseng, S; Harty, L M

    1991-06-01

    Nurse administrators were faced with how to staff for a rapid expansion in number of beds in the face of a 15% nurse vacancy rate. The authors discuss how they addressed this issue through their multifaceted strategic plan.

  6. 50 CFR 600.1008 - Implementation plan and implementation regulations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... relevant aspects of implementing the program, including: (1) The reduction fishery; (2) The reduction... program, including: (1) The reduction fishery; (2) The reduction methodology; (3) The maximum reduction... will: (1) Specify, for invitations to bid, bids, and reduction contracts under § 600.1009: (i)...

  7. 76 FR 17584 - Approval and Promulgation of Implementation Plans; Oklahoma; Regional Haze State Implementation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-30

    ... Implementation Plan; Federal Implementation Plan for Interstate Transport of Pollution Affecting Visibility and...: Announcement of public hearing. SUMMARY: On March 22, 2011, EPA published a proposal in the Federal Register to... EPA announced an open house and public hearing for the proposal to be held April 13, 2011, in...

  8. California Schoolin': The Rocky Road to the Master Plan.

    ERIC Educational Resources Information Center

    Smith, Wilson

    2000-01-01

    Reviews the book by John Aubrey Douglass, "The California Idea and American Higher Education," suggesting that it presents a masterful, highly informative, encyclopedic modern history of California's public higher education as it looks at the state government's work toward sponsorship of higher education over the years. (SM)

  9. Sulfur Dioxide State Implementation Plan (SIP) Checklist Guide

    EPA Pesticide Factsheets

    Tools, guidance, and examples to assist air quality agencies of non-attainment areas in developing plans to implement national ambient air quality standards (NAAQS), including the sulfur dioxide (SO2) air emissions standard.

  10. 40 CFR 49.9986 - Contents of implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Implementation Plan for the Confederated Tribes of the Coos, Lower Umpqua and Siuslaw Indians of Oregon § 49.9986... the Coos, Lower Umpqua and Siuslaw Indians consists of the following rules, regulations, and...

  11. 40 CFR 49.9986 - Contents of implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Implementation Plan for the Confederated Tribes of the Coos, Lower Umpqua and Siuslaw Indians of Oregon § 49.9986... the Coos, Lower Umpqua and Siuslaw Indians consists of the following rules, regulations, and...

  12. 40 CFR 49.9986 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Implementation Plan for the Confederated Tribes of the Coos, Lower Umpqua and Siuslaw Indians of Oregon § 49.9986... the Coos, Lower Umpqua and Siuslaw Indians consists of the following rules, regulations, and...

  13. Implementing the Aquidneck Island West Side Master Plan

    EPA Pesticide Factsheets

    This report describes a technical assistance project with Aquidneck Island to develop approaches for mixed-use zoning standards, design guidelines, and review processes to implement the West Side Master Plan.

  14. State Waste Discharge Permit ST-4502 Implementation Plan

    SciTech Connect

    BROWN, M.J.; LECLAIR, M.D.

    2000-09-27

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

  15. Are Urban Stream Restoration Plans Worth Implementing?

    NASA Astrophysics Data System (ADS)

    Sarvilinna, Auri; Lehtoranta, Virpi; Hjerppe, Turo

    2017-01-01

    To manage and conserve ecosystems in a more sustainable way, it is important to identify the importance of the ecosystem services they provide and understand the connection between natural and socio-economic systems. Historically, streams have been an underrated part of the urban environment. Many of them have been straightened and often channelized under pressure of urbanization. However, little knowledge exists concerning the economic value of stream restoration or the value of the improved ecosystem services. We used the contingent valuation method to assess the social acceptability of a policy-level water management plan in the city of Helsinki, Finland, and the values placed on improvements in a set of ecosystem services, accounting for preference uncertainty. According to our study, the action plan would provide high returns on restoration investments, since the benefit-cost ratio was 15-37. Moreover, seventy-two percent of the respondents willing to pay for stream restoration chose "I want to conserve streams as a part of urban nature for future generations" as the most motivating reason. Our study indicates that the water management plan for urban streams in Helsinki has strong public support. If better marketed to the population within the watershed, the future projects could be partly funded by the local residents, making the projects easier to accomplish. The results of this study can be used in planning, management and decision making related to small urban watercourses.

  16. Tank farms justification for continued operations 007 Implementation Plan

    SciTech Connect

    Propson, J.G., Westinghouse Hanford

    1996-08-23

    This Implementation Plan (IP) provides detailed descriptions, cost estimates, and schedules of activities required to implement the controls specified in Flammable Gas/Slurry Growth Unreviewed Safety Question: Justification for Continued Operation for the Tank Farms at Hanford Site (WHC-SD-WM-JCO-007, Rev.0). This IP complies with the Interim Operational Safety Requirements (IOSR) Administrative Control 5.27 and WHC-IP-0842 Volume 4 Section 5.6 for such a plan.

  17. Environmental Protection Implementation Plan, November 9, 1991--November 9, 1992

    SciTech Connect

    Latham, A.R.; Evans, R.B.

    1991-11-01

    DOE Order 5400.1, General Environmental Protection Program,'' established environmental protection program requirements, authorities, and responsibilities to assure that the Department of Energy (DOE) operations are in compliance with applicable federal, state, and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter 3 of DOE Order 5400.1 required that each field organization prepare a plan for implementing the requirements of this order by no later than November 9, 1989, and update the plan annually. Therefore, the Department of Energy/Field Office, Nevada (DOE/NV) has prepared this second annual update of its Environmental Protection Implementation Plan (EPIP). The Order and corresponding guidances also require estimated budgetary resources necessary for implementation of the Order be identified in the Environmental Protection Implementation Plan. To satisfy this requirement, the estimated costs to effectuate necessary changes in existing programs or processes and to institute new programs or processes for compliance with the Order are provided in the following sections of this plan. The DOE/NV Assistant Manager for Operations (AMO), in consultation with other organizations responsible for line management of plan implementation, is responsible for annual plan revisions. 7 figs.

  18. Handbook for Decentralized Education Planning. Implementing National EFA Plans

    ERIC Educational Resources Information Center

    Online Submission, 2005

    2005-01-01

    The Dakar 2000 goal of Education For All (EFA) is at the center of UNESCO's education activities worldwide. The wide-ranging efforts to achieve EFA in many countries involve education reform, development strategies and plans. Decentralization, a major component in modernizing the public sector, is also applicable to the education sector. The…

  19. 40 CFR 49.9956 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... detrimental to public health or welfare. (k) Section 49.137Rule for air pollution episodes. (l) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (m) Section 49... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes-Region...

  20. 40 CFR 49.10706 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  1. 40 CFR 49.11016 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... (k) Section 49.135Rule for emissions detrimental to public health or welfare. (l) Section 49.137Rule for air pollution episodes. (m) Section 49.138Rule for the registration of air pollution sources and... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  2. 40 CFR 49.10406 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (n) Section 49.137Rule for air pollution episodes. (o) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (p) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  3. 40 CFR 49.10556 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  4. 40 CFR 49.10376 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  5. 40 CFR 49.10646 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  6. 40 CFR 49.10986 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  7. 40 CFR 49.10436 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  8. 40 CFR 49.10736 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  9. 40 CFR 49.10586 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  10. 40 CFR 49.10856 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  11. 40 CFR 49.10136 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  12. 40 CFR 49.9986 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes-Region X...) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section 49.126Rule for...

  13. 40 CFR 49.10496 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  14. 40 CFR 49.10226 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  15. 40 CFR 49.10166 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  16. 40 CFR 49.10196 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  17. 40 CFR 49.9896 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes-Region X... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  18. 40 CFR 49.10016 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  19. 40 CFR 49.11106 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  20. 40 CFR 49.10956 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  1. 40 CFR 49.10926 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  2. 40 CFR 49.10316 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  3. 40 CFR 49.9866 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes-Region...

  4. 40 CFR 49.10346 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  5. 40 CFR 49.10886 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  6. 40 CFR 49.10826 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  7. 40 CFR 49.10256 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  8. 40 CFR 49.10526 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  9. 40 CFR 49.11076 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  10. 40 CFR 49.10046 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  11. 40 CFR 49.10766 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  12. 40 CFR 49.10286 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  13. 40 CFR 49.10106 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....135Rule for emissions detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  14. 40 CFR 49.10676 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  15. 40 CFR 49.11046 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  16. 40 CFR 49.10466 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  17. 40 CFR 51.851 - State Implementation Plan (SIP) revision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false State Implementation Plan (SIP... Plan (SIP) revision. Link to an amendment published at 75 FR 17272, April 5, 2010. (a) Each State must... to meet the Act requirements until such time as the required conformity SIP revision is approved...

  18. Management Planning Requirements for Implementing Office Automation.

    ERIC Educational Resources Information Center

    McDole, Thomas L.

    To be successful in implementing office automation, office managers must consider more than the obvious question of which system to purchase. They must consider whether automation of their particular office and operations will yield benefits of a significant magnitude to warrant the expense of money, time, and energy needed to install and operate…

  19. The Impact on Clinics of the California Office of Family Planning Budget Cuts.

    ERIC Educational Resources Information Center

    Brindis, Claire; And Others

    The California Office of Family Planning (OFP), a branch of the Family Health Division, Department of Health Services, was established in 1973 to provide assistance and services relating to the planning of families. In July 1989, state appropriations for OFP were cut by two-thirds, leaving $12 million to support the provision of family planning…

  20. Implementation in Practice: Adaptations to Sexuality Education Curricula in California

    ERIC Educational Resources Information Center

    Arons, Abigail; Decker, Mara; Yarger, Jennifer; Malvin, Jan; Brindis, Claire D.

    2016-01-01

    Background: Local implementation of evidence-based curricula, including sex education, has received increasing attention. Although there are expectations that practitioners will implement evidence-based programs with fidelity, little is known regarding the experiences of instructors in meeting such standards. During 2005 to 2009, the California…

  1. 40 CFR 49.10406 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....137Rule for air pollution episodes. (o) Section 49.138Rule for the registration of air pollution sources... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation....133Rule for agricultural burning permits. (l) Section 49.134Rule for forestry and silvicultural...

  2. 40 CFR 49.10646 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  3. 40 CFR 49.10886 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  4. 40 CFR 49.10956 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  5. 40 CFR 49.11106 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  6. 40 CFR 49.10046 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  7. 40 CFR 49.10496 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  8. 40 CFR 49.10856 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  9. 40 CFR 49.10556 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  10. 40 CFR 49.10586 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  11. 40 CFR 49.11076 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  12. 40 CFR 49.10316 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  13. 40 CFR 49.10286 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  14. 40 CFR 49.10736 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  15. 40 CFR 49.10376 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  16. 40 CFR 49.11046 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  17. 40 CFR 49.10196 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  18. 40 CFR 49.10766 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  19. 40 CFR 49.10986 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  20. 40 CFR 49.10826 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  1. 40 CFR 49.10466 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  2. 40 CFR 49.10256 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  3. 40 CFR 49.10016 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation...) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section 49.126Rule for...

  4. 40 CFR 49.10166 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  5. 40 CFR 49.10926 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  6. 40 CFR 49.10436 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  7. 40 CFR 49.10136 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  8. 40 CFR 49.10226 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  9. 40 CFR 49.10346 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  10. 40 CFR 51.1002 - Submittal of State implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... 51.1002 Section 51.1002 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Implementation of PM2.5 National Ambient Air Quality Standards § 51.1002 Submittal of State implementation plan. (a) For any area designated by EPA as nonattainment for the PM2.5 NAAQS, the State must submit...

  11. 40 CFR 51.372 - State Implementation Plan submissions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Inspection... Standard in place prior to implementation of the 8-hour ozone standard and including all necessary legal... later than November 15, 1993. For non-attainment areas designated and classified under the 8-hour...

  12. 40 CFR 51.372 - State Implementation Plan submissions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Inspection... Standard in place prior to implementation of the 8-hour ozone standard and including all necessary legal... later than November 15, 1993. For non-attainment areas designated and classified under the 8-hour...

  13. 76 FR 508 - Approval and Promulgation of Implementation Plans; Idaho

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-05

    ...EPA is proposing to approve revisions to the Idaho State Implementation Plan (SIP) that were submitted to EPA by the State of Idaho on April 16, 2007. This SIP submittal includes new and revised rules which provide the Idaho Department of Environmental Quality (IDEQ) the regulatory authority to address regional haze and to implement Best Available Retrofit Technology (BART) requirements. The......

  14. Implementation in Head Start Planned Variation: 1971-72.

    ERIC Educational Resources Information Center

    Lukas, Carol VanDeusen; Wohlleb, Cindy

    This report on model implementation during the third year (1971-72) of the Head Start Planned Variation experiment concentrates on the development of measures of implementation. Measures are examined individually in terms of design and use, strengths and weaknesses, and findings obtained, and agreement among raters on the extent of implementation…

  15. Strategic Planning Implementation in Indonesia’s Transmigration Plan.

    DTIC Science & Technology

    1984-06-01

    suggest that a critical aspect cf top management’s work today involves matching organizational competencies with the opportunities and risks created by...sectors simultaneously, and the government was unable to create a favourable condition as a support means, the plan failed to 46 raise up the eccnomic...conditicn of the Indonesian people. This created a national conflict that caused the successio, cf the President in 1965. Under Socharto’s Leadership

  16. 40 CFR 49.11080 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Warm Springs... following regulations are incorporated and made part of the implementation plan for the Warm...

  17. 40 CFR 49.11080 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Warm Springs... following regulations are incorporated and made part of the implementation plan for the Warm...

  18. 40 CFR 49.11080 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Warm Springs... following regulations are incorporated and made part of the implementation plan for the Warm...

  19. 77 FR 35870 - Approval of Air Quality Implementation Plans; Wisconsin; Partial Disapproval of “Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-15

    ... AGENCY 40 CFR Part 52 Approval of Air Quality Implementation Plans; Wisconsin; Partial Disapproval of ``Infrastructure'' State Implementation Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule...'' State Implementation Plan (SIP). Specifically, we are finalizing the disapproval of portions of...

  20. 40 CFR 49.10170 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Jamestown S'klallam Tribe of Washington § 49... incorporated and made part of the implementation plan for the Reservation of the Jamestown S'Klallam Tribe:...

  1. 40 CFR 49.10170 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Jamestown S'klallam Tribe of Washington § 49... incorporated and made part of the implementation plan for the Reservation of the Jamestown S'Klallam Tribe:...

  2. 40 CFR 49.10170 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Jamestown S'klallam Tribe of Washington § 49... incorporated and made part of the implementation plan for the Reservation of the Jamestown S'Klallam Tribe:...

  3. 76 FR 62002 - Revisions to the California State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-06

    ... ``anonymous access'' system, and EPA will not know your identity or contact information unless you provide it... Measure (SCM) titled, ``Suggested Control Measure for Automotive Coatings.'' SJVUAPCD Rule 4653 is revised... 21, 2001 (the Little Bluebook). 4. CARB's Suggested Control Measure (SCM) titled, ``Suggested...

  4. 75 FR 68294 - Revisions to the California State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... sulfur (SO 2 ) and particulate matter emissions from boilers, steam generators and process heaters... Boilers, Steam Generators and Process Heaters greater than 5.0 MMbtu/hr. On April 20, 2009, EPA determined... X , SO 2 , PM10 and CO emissions from boilers, steam generators and process heaters with a...

  5. 76 FR 32113 - Revisions to the California State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-03

    ..., Surface Coatings of Metal Parts and Products, Plastic Parts and Products and Pleasure Crafts, Aerospace Coating Operations and Automotive Refinishing Operations. We are proposing to approve local rules to..., Plastic Parts and Products and Pleasure Crafts. ICAPCD 425 Aerospace Coating Operations..... 2/23/10...

  6. 75 FR 14545 - Revisions to the California State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-26

    ... refinery vacuum producing devices by covering hot wells and collecting vapors for recycle to refinery gas... emissions from a refinery process unit turnaround by collecting vapors for recycle to refinery...

  7. Achieving succession planning and implementation: one healthcare network's story.

    PubMed

    Capuano, Terry Ann; MacKenzie, Richard

    2013-01-01

    Frequent transitions in leadership can cause inefficiency, inconsistency, and lack of alignment with priorities and strategy. Retaining management talent and collaboratively planning their succession can help ensure organizational survival. Succession planning, in healthcare and other industries, addresses some of these concerns; however, there is a dearth of descriptive articles emphasizing "how to." This article demonstrates one healthcare network's comprehensive system for succession planning and implementation. Leaders looking to plan their human resource processes for organizational sustainability would be able to emulate and adapt practices for their networks.

  8. Biodiversity and Landscape Planning: Alternative Futures for the Region of Camp Pendleton, California

    DTIC Science & Technology

    1996-01-01

    with the cooperation of the two relevant regional agencies, the San Diego Association of Governments and the Southern California Association of...Governments, and Marine Corps Base Camp Pendleton. 14. SUBJECT TERMS 15. NUMBER OF PAGES SERDP, Biodiversity, Southern California, Urban growth, Landscape...Biodiversity Research Consortium, with the cooperation of the two relevant regional planning agencies, the San Diego Association of Governments and the Southern

  9. Best Practices Models for Implementing, Sustaining, and Using Instructional School Gardens in California

    ERIC Educational Resources Information Center

    Hazzard, Eric L.; Moreno, Elizabeth; Beall, Deborah L.; Zidenberg-Cherr, Sheri

    2011-01-01

    To ascertain best practices for schools implementing or sustaining instructional school gardens by interviewing key members in 10 schools with exemplary instructional school gardens programs in California. Practices of schools with exemplary instructional school gardens programs were analyzed by constant comparative analysis using qualitative data…

  10. Implementing California's School Funding Formula: Will High-Need Students Benefit? Technical Appendix

    ERIC Educational Resources Information Center

    Hill, Laura; Ugo, Iwunze

    2015-01-01

    Intended to accompany "Implementing California's School Funding Formula: Will High-Need Students Benefit?," this appendix examines the extent to which school shares of high-need students vary relative to their district concentrations by grouping approximately 950 school districts by their share of high-need students, arraying them into…

  11. Key Factors Associated with the Effective Implementation and Impact of California's Educational Reform.

    ERIC Educational Resources Information Center

    Marsh, David D.

    This study focused on the implementation of "top-down" California state-initiated reform in secondary schools and the impact of that process on several outcomes: student academic achievement and the capacity of the organization to carry out ongoing reform. The research was part of a broader study of secondary school reform and how the…

  12. 78 FR 4868 - Notice of Intent To Amend the California Desert Conservation Area Plan and Prepare an Associated...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-23

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE INTERIOR Bureau of Land Management Notice of Intent To Amend the California Desert Conservation Area Plan and...) Needles Field Office, Needles, California intends to prepare an amendment to the California...

  13. 76 FR 44036 - Proposed Low-Effect Habitat Conservation Plan for the California Tiger Salamander, AT&T Portable...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ... Fish and Wildlife Service Proposed Low-Effect Habitat Conservation Plan for the California Tiger... potential for ``take'' of one Federally listed animal, the California tiger salamander. The applicant would... for the California tiger salamander into a new storage facility for portable generators within...

  14. Implementing Strategic Environmental Assessment of spatial planning tools

    SciTech Connect

    De Montis, Andrea

    2013-07-15

    After more than a decade from the publication of the European Directive 2001/42/CE (Directive) on Strategic Environmental Assessment (SEA), the design and construction of the interested spatial planning instruments has gone through a variety of changes and integrations in European and in world states. This inhomogeneous panorama can be explained with a pattern of institutional structures that have so far affected the implementation of the Directive. The aim of this paper is to investigate the level of implementation of the Directive in Italy by developing a comparative analysis of the quality of integration of SEA within the design of the spatial coordination plan of a set of Italian provinces. Italian practice is analyzed in the framework of a comparative study of worldwide SEA implementation within spatial and land use planning. The results reveal strengths and weaknesses in SEA implementation at the provincial level and, in particular, the emergence of critical areas of research concerning institutional context, public participation, monitoring, and observatory of the spatial transformations. -- Highlights: • This is a comparative analysis of SEA in strategic spatial planning in Italy. • The adhesion of Provinces to the study is remarkable. • SEA implementation and integration into spatial planning is still moderate. • Participation via consultations should be more widespread. • Monitoring and institution of observatories are still in an infancy stage.

  15. Covered California: The Impact of Provider and Health Plan Market Power on Premiums.

    PubMed

    Scheffler, Richard M; Kessell, Eric; Brandt, Margareta

    2015-12-01

    We explain the establishment of Covered California, California's health insurance marketplace. The marketplace uses an active purchaser model, which means that Covered California can selectively contract with some health plans and exclude others. During the 2014 open-enrollment period, it enrolled 1.3 million people, who are covered by eleven health plans. We describe the market shares of health plans in California and in each of the nineteen rating regions. We examine the empirical relationship between measures of provider market concentration--spanning health plans, hospitals, and medical groups--and rating region premiums. To do this, we analyze premiums for silver and bronze plans for specific age groups. We find both medical group concentration and hospital concentration to be positively associated with premiums, while health plan concentration is not statistically significant. We simulate the impact of reducing hospital concentration to levels that would exist in moderately competitive markets. This produces a predicted overall premium reduction of more than 2 percent. However, in three of the nineteen rating regions, the predicted premium reduction was more than 10 percent. These results suggest the importance of provider market concentration on premiums.

  16. Implementation plan for Bolivian Mineral Exploration Fund

    USGS Publications Warehouse

    Kirkemo, Harold

    1978-01-01

    Bolivia ranks second among world producers of tin and antimony, and first in bismuth production. Mineral exports in 1975 were valued at $314.2 million, nearly 60 percent of the value of all exports, and petroleum product exports totalled nearly $157 million, or 30 percent of the total. Tin accounted for 58 percent of the total value of metallic mineral exports. The central government derived about 19 percent of its total tax revenues in 1975 from the mining sector. The mining sector consists of the large, medium, and small mining subsectors, a classification established by the government. Individual operations are referred to as large, medium, or small depending upon the subsector into which they are classified. All large mining enterprises are owned and operated by a government corporation, COMIBOL; the medium and small operations are privately owned. COMIBOL's exports in 1975 were valued at $171.8 million or 70 percent of the total mineral exports; the medium mines accounted for $55.5 million or 23 percent, and the small mines for $17.5 million or 7 percent of the total. The combination of high operating costs, low productivity, inadequate ore reserves, and insufficient risk capital for exploration and development has led to the realization that there is an urgent need to improve the situation for mining in Bolivia. Proposals are being studied to revise the tax code, a program is underway to evaluate selected mineral deposits for possible exploration and development, and programs are under consideration to encourage minerals exploration. A minerals exploration plan is proposed which would offer technical and financial aid to various segments in the minerals field. A program, estimated to cost between $2 million and $2.5 million annually, and to be operated by a new agency in the Ministry of Mining and Metallurgy, is outlined.

  17. Update of the Used Fuel Dispositon Campaign Implementation Plan

    SciTech Connect

    McMahon, Kevin A.; Bragg-Sitton, Shannon; Mackinnon, Robert James; Saltzstein, Sylvia J.; Sorenson, Ken B.; Swift, Peter N.; Birkholzer, Jens T.

    2014-10-01

    This Update to the Used Fuel Disposition Campaign Implementation Plan provides summary level detail describing how the Used Fuel Disposition Campaign (UFDC) supports achievement of the overarching mission and objectives of the Department of Energy Office of Nuclear Energy Fuel Cycle Technologies Program, building on work completed in this area since 2009. This implementation plan begins with the assumption of target dates that are set out in the January 2013 DOE Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (http://energy.gov/downloads/strategy-management-and-disposal-used-nuclearfuel- and-high-level-radioactive-waste). These target dates and goals are summarized in section III. This implementation plan will be maintained as a living document and will be updated as needed in response to available funding and progress in the Used Fuel Disposition Campaign and the Fuel Cycle Technologies Program.

  18. Update of the used fuel disposition Campaign Implementation Plan

    SciTech Connect

    Birkholzer, Jens; MacKinnon, Robert; McMahon, Kevin; Saltzstein, Sylvia; Sorenson, Ken; Swift, Peter

    2014-09-01

    This Campaign Implementation Plan provides summary level detail describing how the Used Fuel Disposition Campaign (UFDC) supports achievement of the overarching mission and objectives of the Department of Energy Office of Nuclear Energy Fuel Cycle Technologies Program The implementation plan begins with the assumption of target dates that are set out in the January 2013 DOE Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (http://energy.gov/downloads/strategy-management-and-disposal-used-nuclear-fuel-and-high-level-radioactive-waste). These target dates and goals are summarized in section III. This implementation plan will be maintained as a living document and will be updated as needed in response to progress in the Used Fuel Disposition Campaign and the Fuel Cycle Technologies Program.

  19. High performance computing and communications: FY 1996 implementation plan

    SciTech Connect

    1995-05-16

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage of the High Performance Computing Act of 1991, signed on December 9, 1991. Twelve federal agencies, in collaboration with scientists and managers from US industry, universities, and research laboratories, have developed the Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1995 and FY 1996. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency.

  20. Planning, implementing, and using a virtual reference service.

    PubMed

    MacDonald, Marlyse H

    2003-01-01

    Virtual reference (VR) can be a successful vehicle for libraries if there is a demonstrated need by the user base for such a service and if the library staff believes in, accepts, and plans thoroughly for the concept. This article focuses on the experiences of the Duke University Medical Center Library (DUMCL) in planning, implementing, and using a virtual reference service utilizing LSSI's Virtual Reference Desk (VRD) Software.

  1. Energy Efficiency Roadmap for Petroleum Refineries in California

    SciTech Connect

    none,

    2004-04-01

    Through the California State IOF initiative, the California Energy Commission PIER Program developed a petroleum refining roadmap to identify energy issues and priorities unique to the refining industry in California and create a plan for future R&D that could help California refineries implement energy efficient technologies.

  2. The Need to Update Space Planning Policies for the California Community Colleges. Fact Sheet 05-07

    ERIC Educational Resources Information Center

    California Postsecondary Education Commission, 2005

    2005-01-01

    California plans its development of public higher education facilities using policies called "space and utilization" guidelines and standards. These are budgetary planning tools that can measure existing and future need for academic spaces such as classrooms, laboratories, research space, and faculty offices. California's current space…

  3. 78 FR 40764 - Notice of Intent To Amend the California Desert Conservation Area Plan for the Needles Field...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-08

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE INTERIOR Bureau of Land Management Notice of Intent To Amend the California Desert Conservation Area Plan for the... amendment to the 1980 California Desert Conservation Area (CDCA) Plan with an associated...

  4. Environmental Scan: A Summary of Key Issues Facing California Community Colleges Pertinent to the Strategic Planning Process

    ERIC Educational Resources Information Center

    Research and Planning Group for California Community Colleges (RP Group), 2005

    2005-01-01

    As part of the Statewide Strategic Planning Process for California Community Colleges, the Center for Student Success, the research and evaluation organization of the Research and Planning Group for California Community Colleges (RP/CSS) was asked to develop a series of overview documents that would outline both internal and external trends that…

  5. Development and implementation of an interdisciplinary plan of care.

    PubMed

    Lewis, Cynthia; Hoffmann, Mary Lou; Gard, Angela; Coons, Jacqueline; Bichinich, Pat; Euclid, Jeff

    2005-01-01

    In January 2002 Aurora Health Care Metro Region chartered an interdisciplinary team to develop a process and structure for patient-centered interdisciplinary care planning. This unique endeavor created a process that includes the patient, family, and all clinical disciplines involved in planning and providing care to patients from system point of entry throughout the entire acute care episode. The interdisciplinary plan of care (IPOC) demonstrates the integration of prioritized problems, outcomes, and measurement toward goal attainment. This article focuses on the journey of this team to the successful implementation of an IPOC.

  6. Comparison and Field Validation of Binomial Sampling Plans for Oligonychus perseae (Acari: Tetranychidae) on Hass Avocado in Southern California.

    PubMed

    Lara, Jesus R; Hoddle, Mark S

    2015-08-01

    Oligonychus perseae Tuttle, Baker, & Abatiello is a foliar pest of 'Hass' avocados [Persea americana Miller (Lauraceae)]. The recommended action threshold is 50-100 motile mites per leaf, but this count range and other ecological factors associated with O. perseae infestations limit the application of enumerative sampling plans in the field. Consequently, a comprehensive modeling approach was implemented to compare the practical application of various binomial sampling models for decision-making of O. perseae in California. An initial set of sequential binomial sampling models were developed using three mean-proportion modeling techniques (i.e., Taylor's power law, maximum likelihood, and an empirical model) in combination with two-leaf infestation tally thresholds of either one or two mites. Model performance was evaluated using a robust mite count database consisting of >20,000 Hass avocado leaves infested with varying densities of O. perseae and collected from multiple locations. Operating characteristic and average sample number results for sequential binomial models were used as the basis to develop and validate a standardized fixed-size binomial sampling model with guidelines on sample tree and leaf selection within blocks of avocado trees. This final validated model requires a leaf sampling cost of 30 leaves and takes into account the spatial dynamics of O. perseae to make reliable mite density classifications for a 50-mite action threshold. Recommendations for implementing this fixed-size binomial sampling plan to assess densities of O. perseae in commercial California avocado orchards are discussed.

  7. 77 FR 63228 - Approval and Promulgation of Air Quality Implementation Plans; Connecticut, Maine, Massachusetts...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-16

    ... Implementation Plans; Connecticut, Maine, Massachusetts, New Hampshire; Infrastructure SIPs for the 1997 and 2006... State Implementation Plan (SIP) meets the requirements of section 110(a) of the Clean Air Act (CAA) for... plans called state implementation plans (SIPs) that provide for the implementation, maintenance...

  8. Challenges and opportunities for implementing sustainable energy strategies in coastal communities of Baja California Sur, Mexico

    NASA Astrophysics Data System (ADS)

    Etcheverry, Jose R.

    This dissertation explores the potential of renewable energy and efficiency strategies to solve the energy challenges faced by the people living in the biosphere reserve of El Vizcaino, which is located in the North Pacific region of the Mexican state of Baja California Sur. This research setting provides a practical analytical milieu to understand better the multiple problems faced by practitioners and agencies trying to implement sustainable energy solutions in Mexico. The thesis starts with a literature review (chapter two) that examines accumulated international experience regarding the development of renewable energy projects as a prelude to identifying the most salient implementation barriers impeding this type of initiatives. Two particularly salient findings from the literature review include the importance of considering gender issues in energy analysis and the value of using participatory research methods. These findings informed fieldwork design and the analytical framework of the dissertation. Chapter three surveys electricity generation as well as residential and commercial electricity use in nine coastal communities located in El Vizcaino. Chapter three summarizes the fieldwork methodology used, which relies on a mix of qualitative and quantitative research methods that aim at enabling a gender-disaggregated analysis to describe more accurately local energy uses, needs, and barriers. Chapter four describes the current plans of the state government, which are focused in expanding one of the state's diesel-powered electricity grids to El Vizcaino. The Chapter also examines the potential for replacing diesel generators with a combination of renewable energy systems and efficiency measures in the coastal communities sampled. Chapter five analyzes strategies to enable the implementation of sustainable energy approaches in El Vizcaino. Chapter five highlights several international examples that could be useful to inform organizational changes at the federal

  9. Enhancing Price Response Programs through Auto-DR: California's 2007 Implementation Experience

    SciTech Connect

    Kiliccote, Sila; Wikler, Greg; Chiu, Albert; Piette, Mary Ann; Kiliccote, Sila; Hennage, Dan; Thomas, Chuck

    2007-12-18

    This paper describes automated demand response (Auto-DR) activities, an innovative effort in California to ensure that DR programs produce effective and sustainable impacts. Through the application of automation and communication technologies coupled with well-designed incentives and DR programs such as Critical Peak Pricing (CPP) and Demand Bidding (DBP), Auto-DR is opening up the opportunity for many different types of buildings to effectively participate in DR programs. We present the results of Auto-DR implementation efforts by the three California investor-owned utilities for the Summer of 2007. The presentation emphasizes Pacific Gas and Electric Company's (PG&E) Auto-DR efforts, which represents the largest in the state. PG&E's goal was to recruit, install, test and operate 15 megawatts of Auto-DR system capability. We describe the unique delivery approaches, including optimizing the utility incentive structures designed to foster an Auto-DR service provider community. We also show how PG&E's Critical Peak Pricing (CPP) and Demand Bidding (DBP) options were called and executed under the automation platform. Finally, we show the results of the Auto-DR systems installed and operational during 2007, which surpassed PG&E's Auto-DR goals. Auto-DR is being implemented by a multi-disciplinary team including the California Investor Owned Utilities (IOUs), energy consultants, energy management control system vendors, the Lawrence Berkeley National Laboratory (LBNL), and the California Energy Commission (CEC).

  10. 40 CFR 51.390 - Implementation plan revision.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Section 51.390 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... U.S.C. or the Federal Transit Laws § 51.390 Implementation plan revision. (a) Purpose and... the requirements of Clean Air Act section 176(c) until such time as EPA approves the...

  11. 40 CFR 51.390 - Implementation plan revision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 51.390 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... U.S.C. or the Federal Transit Laws § 51.390 Implementation plan revision. (a) Purpose and... the requirements of Clean Air Act section 176(c) until such time as EPA approves the...

  12. The Common Core: Are State Implementation Plans Enough?

    ERIC Educational Resources Information Center

    Best, Jane; Cohen, Courtney

    2013-01-01

    This policy brief outlines the Common Core implementation plans for 15 states, including the professional development and resources/tools--such as instructional materials, toolkits, frameworks, crosswalks, and curriculum guides--that each state is providing. The authors suggest that supplemental resources like McREL's Common Core…

  13. Planning for Transition: An Implementation Guide for Administrators and Teachers.

    ERIC Educational Resources Information Center

    Kelker, Katharin; And Others

    This implementation guide, based on the MESH model (Montana Model for Education of the Severely Handicapped), is intended to assist administrators and teachers in planning for the transition of special education students from one placement to another, with emphasis on preparation for community living and independent functioning. The 11 modules…

  14. 40 CFR 49.11016 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Section 49.135Rule for emissions detrimental to public health or welfare. (l) Section 49.137Rule for air pollution episodes. (m) Section 49.138Rule for the registration of air pollution sources and the reporting... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X...

  15. 40 CFR 49.10706 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V operating permits... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X...

  16. The Empowerment Dynamic: Planning and Implementing a Support Group Network.

    ERIC Educational Resources Information Center

    Stephens, Robin; Haley, Pat

    This handbook describes how to plan and implement a support group for disabled youth in transition from school to work. It was developed from the experiences of a 3-year model program entitled Employability Support Network of Disabled Youth (ESN) which used support groups to accomplish its primary goal of creating "employability readiness" for…

  17. 28 CFR 90.23 - State implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 90.23 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) VIOLENCE AGAINST WOMEN The STOP (Services ⢠Training ⢠Officers ⢠Prosecutors) Violence Against Women Formula Grant Program § 90.23 State... purposes of the Violence Against Women Act. (b) The implementation plan should describe how the State,...

  18. 28 CFR 90.23 - State implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 90.23 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) VIOLENCE AGAINST WOMEN The STOP (Services ⢠Training ⢠Officers ⢠Prosecutors) Violence Against Women Formula Grant Program § 90.23 State... purposes of the Violence Against Women Act. (b) The implementation plan should describe how the State,...

  19. 28 CFR 90.23 - State implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 90.23 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) VIOLENCE AGAINST WOMEN The STOP (Services ⢠Training ⢠Officers ⢠Prosecutors) Violence Against Women Formula Grant Program § 90.23 State... purposes of the Violence Against Women Act. (b) The implementation plan should describe how the State,...

  20. 28 CFR 90.23 - State implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 90.23 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) VIOLENCE AGAINST WOMEN The STOP (Services ⢠Training ⢠Officers ⢠Prosecutors) Violence Against Women Formula Grant Program § 90.23 State... purposes of the Violence Against Women Act. (b) The implementation plan should describe how the State,...

  1. TTIP: Texas Teacher Internship Program 1994 Curriculum Implementation Plans.

    ERIC Educational Resources Information Center

    Walenta, Brian T., Ed.

    The Texas Teacher Internship Program (TTIP) is a competitive program for science, technology and mathematics teachers who serve as summer interns at industry and university sites in order to experience real world applications of the subjects they teach. This document contains curriculum implementation plans developed by the teachers to illustrate…

  2. 40 CFR 49.10106 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X...

  3. 40 CFR 49.10676 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X...

  4. 40 CFR 49.10526 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X...

  5. Current Strategic Business Plan for the Implementation of Digital Systems.

    ERIC Educational Resources Information Center

    Library of Congress, Washington, DC. National Library Service for the Blind and Physically Handicapped.

    This document presents a current strategic business plan for the implementation of digital systems and services for the free national library program operated by the National Library Service for the Blind and Physically Handicapped, Library of Congress, its network of cooperating regional and local libraries, and the United States Postal Service.…

  6. Guide of Ideas for Planning and Implementing Intergenerational Projects

    ERIC Educational Resources Information Center

    Pinto, Teresa Almeida; Marreel, Iris; Hatton-Yeo, Alan

    2009-01-01

    "Guide of Ideas for Planning and Implementing Intergenerational Projects," is for all professionals that are or wish to be enrolled in the development of intergenerational activities. This "Guide" is the main product of the Project MATES--Mainstreaming Intergenerational Solidarity, co-financed by the Lifelong Learning…

  7. 45 CFR 162.412 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 1 2012-10-01 2012-10-01 false Implementation specifications: Health plans. 162.412 Section 162.412 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  8. 45 CFR 162.412 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 1 2014-10-01 2014-10-01 false Implementation specifications: Health plans. 162.412 Section 162.412 Public Welfare Department of Health and Human Services ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  9. 45 CFR 162.512 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 1 2013-10-01 2013-10-01 false Implementation specifications: Health plans. 162.512 Section 162.512 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  10. 45 CFR 162.412 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 45 Public Welfare 1 2013-10-01 2013-10-01 false Implementation specifications: Health plans. 162.412 Section 162.412 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  11. 45 CFR 162.412 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 45 Public Welfare 1 2011-10-01 2011-10-01 false Implementation specifications: Health plans. 162.412 Section 162.412 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  12. 45 CFR 162.512 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 45 Public Welfare 1 2014-10-01 2014-10-01 false Implementation specifications: Health plans. 162.512 Section 162.512 Public Welfare Department of Health and Human Services ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  13. 45 CFR 162.512 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 45 Public Welfare 1 2012-10-01 2012-10-01 false Implementation specifications: Health plans. 162.512 Section 162.512 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  14. 45 CFR 162.412 - Implementation specifications: Health plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Implementation specifications: Health plans. 162.412 Section 162.412 Public Welfare DEPARTMENT OF HEALTH AND HUMAN SERVICES ADMINISTRATIVE DATA STANDARDS AND RELATED REQUIREMENTS ADMINISTRATIVE REQUIREMENTS Standard Unique Health Identifier for...

  15. Planning for Implementation of Section 504 at Colleges and Universities.

    ERIC Educational Resources Information Center

    Mistler, Sharon

    Included in the discussion of how colleges and universities can plan for the implementation of Section 504 of the 1973 Rehabilitation Act (which gives handicapped people equal access to higher education) are an explanation of Subpart E of the Act, a definition of the handicapped community, and a list of services that should be provided for them on…

  16. TTIP: Texas Teacher Internship Program: 1995 Curriculum Implementation Plans.

    ERIC Educational Resources Information Center

    Walenta, Brian T., Ed.

    In 1989 the Texas Alliance for Science, Technology and Mathematics Education began placing teachers of all levels at industry sites as part of its Texas Teacher Internship Program. In 1995, 15 teachers interned at 11 sites. Each teacher was required to develop a curriculum implementation plan which was to illustrate how they would translate the…

  17. 28 CFR 90.23 - State implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 90.23 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) VIOLENCE AGAINST WOMEN The STOP (Services ⢠Training ⢠Officers ⢠Prosecutors) Violence Against Women Formula Grant Program § 90.23 State... purposes of the Violence Against Women Act. (b) The implementation plan should describe how the State,...

  18. 49 CFR 37.143 - Paratransit plan implementation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Paratransit plan implementation. 37.143 Section 37.143 Transportation Office of the Secretary of Transportation TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Paratransit as a Complement to Fixed Route Service § 37.143 Paratransit...

  19. 2016-2020 Strategic Plan and Implementing Framework

    SciTech Connect

    2015-11-01

    The 2016-2020 Strategic Plan and Implementing Framework from the Office of Energy Efficiency and Renewable Energy (EERE) is the blueprint for launching the nation’s leadership in the global clean energy economy. This document will guide the organization to build on decades of progress in powering our nation from clean, affordable and secure energy.

  20. Institute for Superintendents, Planning and Implementing Programs in Vocational Education.

    ERIC Educational Resources Information Center

    Georgia Univ., Athens. Coll. of Education.

    A 3-day institute was held to assist 30 school superintendents in acquiring information and an understanding essential for planning, implementing, and administering more adequate vocational education programs in their schools. Major presentations were: (1) "The Role and Responsibility of the Superintendent for Vocational Education" by J.W. Letson,…

  1. High performance computing and communications: FY 1995 implementation plan

    SciTech Connect

    1994-04-01

    The High Performance Computing and Communications (HPCC) Program was formally established following passage of the High Performance Computing Act of 1991 signed on December 9, 1991. Ten federal agencies in collaboration with scientists and managers from US industry, universities, and laboratories have developed the HPCC Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1994 and FY 1995. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency. Although the Department of Education is an official HPCC agency, its current funding and reporting of crosscut activities goes through the Committee on Education and Health Resources, not the HPCC Program. For this reason the Implementation Plan covers nine HPCC agencies.

  2. 75 FR 6696 - Draft Recovery Plan for Tidal Marsh Ecosystems of Northern and Central California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-10

    ... Fish and Wildlife Service Draft Recovery Plan for Tidal Marsh Ecosystems of Northern and Central California AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of document availability for review and comment. SUMMARY: We, U.S. Fish and Wildlife Service (Service), announce the availability of...

  3. Management Strategies for Sustainability Education, Planning, Design, Energy Conservation in California Higher Education

    ERIC Educational Resources Information Center

    Petratos, Panagiotis; Damaskou, Evangelia

    2015-01-01

    Purpose: The purpose of this paper is to describe and analyze the effects of campus sustainability planning to annual campus energy inflows and outflows in California higher education. The paper also offers a preliminary statistical analysis for the evaluation of impact factors on energy outflows and a link between energy outflows and building…

  4. 77 FR 64316 - Endangered and Threatened Species; Recovery Plan South-Central California Coast Steelhead...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-19

    ... Plan South-Central California Coast Steelhead Distinct Population Segment AGENCY: National Marine...) (Oncorhynchus mykiss) Distinct Population (DPS). NMFS is soliciting review and comment from the public and all... soliciting relevant information on SCCC Steelhead DPS populations and their freshwater/marine habitats....

  5. Steelhead of the south-central/southern California coast: Population characterization for recovery planning

    USGS Publications Warehouse

    Boughton, David A.; Adams, P.B.; Anderson, E.; Fusaro, Craig; Keller, E.; Kelley, Elsie; Lentsch, Leo; Nielsen, J. L.; Perry, Katie; Regan, Helen; Swift, C.; Watson, Fred

    2006-01-01

    This report by the National Marine Fisheries Service applies a formal evaluation framework to the problem of delineating Oncorhynchus mykiss populations in the South-Central/Southern California Coast recovery domain, in support of recovery planning under the Endangered Species Act.

  6. The Environmental Scan Component of the Strategic Plan for California Community Colleges.

    ERIC Educational Resources Information Center

    Hom, Willard

    This paper describes the environmental scan that the California Community Colleges Chancellor's Office initiated in preparation for its development of a strategic plan. In this scanning effort, environment is defined as "a search for information about the system's external setting." The trends are roughly grouped into five areas:…

  7. California Community Colleges Family and Consumer Sciences: A Plan for the 21st Century Update, 1998.

    ERIC Educational Resources Information Center

    Mount San Antonio Coll., Walnut, CA.

    This update of the 1998 Plan for the 21st Century was designed to augment the California Community College Family and Consumer Sciences in the 21st Century packet, produced in 1996. It summarizes a variety of activities, products and events that have taken place over the past two years, and suggests resources and contacts for learning more about…

  8. Long Range Development Plan, University of California, San Diego, October 1963.

    ERIC Educational Resources Information Center

    Alexander, Robert E.

    The academic and physical development plans of the University of California at San Diego are outlined. Facilities for 27,500 anticipated students are divided into twelve colleges of about 2300 students each. The twelve colleges are arranged into three clusters of four each, grouped around the central academic and administrative facilities, in…

  9. Report on Master Planning for The California State College--Bakersfield.

    ERIC Educational Resources Information Center

    Gruen (Victor) Associates, Los Angeles, CA.

    Academic requirements and criteria are discussed, as well as physical planning response, incremental growth to a campus for 12,000 full time equivalent students, (FTE), environmental character, technical requirements, and the estimated capital costs for California State College at Bakersfield. Specific sections include--(1) site location, (2) site…

  10. Long Range Development Plan, University of California, Riverside.

    ERIC Educational Resources Information Center

    Russell (George Vernon) and Associates, Architects and Planners.

    A long range development plan, conceived as a general guide to final objectives, uses many diagrams and maps to illustrate the text. The plan is predicated on the assumption that orderly and efficient development of site possibilities is subject to ever-changing influences. The following areas are examined--(1) campus environment, (2) academic…

  11. The Best Laid Plans: An Examination of School Plan Quality and Implementation in a School Improvement Initiative

    ERIC Educational Resources Information Center

    Strunk, Katharine O.; Marsh, Julie A.; Bush-Mecenas, Susan C.; Duque, Matthew R.

    2016-01-01

    Purpose: A common strategy used in school improvement efforts is a mandated process of formal planning, yet little is known about the quality of plans or the relationship between plan quality and implementation. This mixed-methods article investigates plan quality, factors associated with plan quality, and the relationship between plan quality and…

  12. 77 FR 70376 - Withdrawal of Approval of Air Quality Implementation Plans and Findings of Failure To Submit...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-26

    ... To Submit Required Plans; California; San Joaquin Valley; 1-Hour and 8-Hour Ozone Extreme Area Plan... California to provide for attainment of the 1-hour ozone National Ambient Air Quality Standards (NAAQS) in..., 2012 determination that the California SIP satisfies the requirement regarding offsetting...

  13. Wildlife management plan, Naval Petroleum Reserve No. 1, Kern County, California

    SciTech Connect

    O'Farrell, T.P.; Scrivner, J.H.

    1987-01-01

    Under the Naval Petroleum Act of 1976, Congress directed the Secretary of the Navy and subsequently the Secretary of Energy, to produce petroleum products from Naval Petroleum Reserve No. 1 (NPR-1) in Kern County, California, at the maximum efficient rate consistent with sound engineering practices. Because of the presence of two endangered species and the quality, quantity, and contiguous nature of habitat on NPR-1, the area is unique and management of its resources deserves special attention. The purpose of this wildlife management plan is to: (1) draw together specific information on NPR-1 wildlife resources; (2) suggest management goals that could be implemented, which if achieved, would result in diverse, healthy wildlife populations; and (3) reinitiate cooperative agreements between the US Department of Energy (DOE) and other conservation organizations regarding the management of wildlife on NPR-1. NPR-1 supports an abundant and diverse vertebrate fauna. Twenty-five mammalian, 92 avian, eight reptilian, and two amphibian species have been observed on Elk Hills. Of these, three are endangered (San Joaquin kit fox, Vulpes macrotis mutica; giant kangaroo rat, Dipodomys ingens; blunt-nosed leopard lizard, Gambelia silus). Nine vertebrates, six invertebrates, and four plant species known to occur or suspected of occurring on Elk Hills are potential candidates for listing. A major objective of this management plan is to minimize the impact of petroleum development activities on the San Joaquin kit fox, giant kangaroo rat, blunt-nosed leopard lizard, and their essential habitats. This will mainly be achieved by monitoring the status of these species and their habitat and by restoring disturbed habitats. In general, management policies designed to benefit the above three species and other species of concern will also benefit other wildlife inhabiting NPR-1.

  14. Habitat restoration plan for Naval Petroleum Reserve No. 1, Kern County, California

    SciTech Connect

    O'Farrell, T.P.; Mitchell, D.L.

    1985-10-01

    In 1976 Congress directed that production on the US Department of Energy's (DOE) Naval Petroleum Reserve No. 1 (NPR-1) in Kern County, California, be increased to the maximum efficient rate to fulfill some United States needs for domestic oil and gas. The US Fish and Wildlife Service (FWS) issued a Biological Opinion, required under the Endangered Species Act of 1973, that proposed construction activities on NPR-1 would jeopardize the continued existence of the endangered San Joaquin kit fox (Vulpes macrotis mutica) and blunt-nosed leopard lizard (Gambelia silus) and damage their critical habitats. One of the reasonable and prudent alternatives that the FWS required if the project were to proceed was that DOE prepare this plan to restore disturbed habitats. The plan was based on published information and the results of habitat restoration studies conducted on NPR-1 between 1981 and 1983. Preconstruction surveys will be used to insure that new disturbances are the minimum size necessary, topsoil is salvaged, and engineering practices are implemented to control soil erosion and enhance revegetation. Existing disturbances will be located, inventoried, classified, and restored using existing guidelines. Native and naturalized plant seeds will be harvested and cultivated; shrub seedlings will be grown in containers suitable for transplantation. An inventory of disturbances, results of preconstruction activities, inventory of topsoil reserves, changes in habitat quality, uses of herbicides and toxic substances, and program costs will be monitored and used to document progress and evaluate the success of the program. Results of the program will be documented in an annual report, at technical information meetings and published in DOE topical reports and scientific journals. 46 refs., 1 fig. 4 tabs.

  15. Oil program implementation plan FY 1996--2000

    SciTech Connect

    1995-04-01

    This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

  16. Top Down Implementation Plan for system performance test software

    NASA Technical Reports Server (NTRS)

    Jacobson, G. N.; Spinak, A.

    1982-01-01

    The top down implementation plan used for the development of system performance test software during the Mark IV-A era is described. The plan is based upon the identification of the hierarchical relationship of the individual elements of the software design, the development of a sequence of functionally oriented demonstrable steps, the allocation of subroutines to the specific step where they are first required, and objective status reporting. The results are: determination of milestones, improved managerial visibility, better project control, and a successful software development.

  17. Standard Review Plan Maintenance Program implementing procedures document

    SciTech Connect

    1996-11-01

    The implementing Procedures Document (IPD) was developed by the Inspection Program Projects Branch, Office of Nuclear Reactor Regulation, with assistance from Pacific Northwest National Laboratory, for the Standard Review Plan Maintenance Program (SRP-MP). The SRP-MP was established to maintain the Standard Review Plan (SRP) on an on-going basis. The IPD provides guidance, including an overall approach and procedures, for SRP-MP tasks. The objective of the IPD is to ensure that modifications to SRP need to reflect current NRC requirements and guidance are identified and that a consistent methodology is used to develop and revise SRP sections.

  18. 76 FR 52387 - Approval and Promulgation of Implementation Plans; New Mexico; Federal Implementation Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-22

    ... plant. The federal plan will require the San Juan Generating Station to cut emissions to improve scenic... improve consistency, cost estimates should be based on the OAQPS Control Cost Manual, [now renamed ``EPA... improve visibility. The NPS goes on to provide several examples of $/ deciview calculations. Two...

  19. 75 FR 56923 - Approval and Promulgation of Implementation Plans; Oklahoma; State Implementation Plan Revisions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ... otherwise modify redundant or incorrect language within the OAC. The variety of revisions includes..., particulate matter, and sulfur dioxide. The plan developed by a State is referred to as the State... 1997 8-hour ozone NAAQS (70 FR 71612), the State submitted a SIP revision on June 24, 2010, to...

  20. Standard Review Plan Update and Development Program. Implementing Procedures Document

    SciTech Connect

    Not Available

    1992-05-01

    This implementing procedures document (IPD) was prepared for use in implementing tasks under the standard review plan update and development program (SRP-UDP). The IPD provides comprehensive guidance and detailed procedures for SRP-UDP tasks. The IPD is mandatory for contractors performing work for the SRP-UDP. It is guidance for the staff. At the completion of the SRP-UDP, the IPD will be revised (to remove the UDP aspects) and will replace NRR Office Letter No. 800 as long-term maintenance procedures.