Science.gov

Sample records for implementation plans california

  1. 75 FR 3680 - Revisions to the California State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-22

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan AGENCY: Environmental... Implementation Plan (SIP). These revisions concern oxides of nitrogen (NO X ) from residential water heaters. We... 1990 (CAA or the Act). We are taking comments on this proposal and plan to follow with a final...

  2. 76 FR 62002 - Revisions to the California State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-06

    ... Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from Motor Vehicle...--Submitted Rules Local Rule Rule title Amended Submitted SJVUAPCD 4612 Motor Vehicle and Mobile 10/21/10 4/5...

  3. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-28

    ... From the Federal Register Online via the Government Publishing Office ] ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA...

  4. 75 FR 45082 - Revisions to the California State Implementation Plan, Santa Barbara County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-02

    ... Air Pollution Control District (SBCAPCD) portion of the California State Implementation Plan (SIP... Environmental protection, Air pollution control, Intergovernmental relations, Nitrogen dioxide, Ozone, Reporting... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Santa Barbara County...

  5. 77 FR 65151 - Finding of Substantial Inadequacy of Implementation Plan; Call for California State...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-25

    ... to find that the California State Implementation Plan (SIP) for the Los Angeles-South Coast Air Basin... the Clean Air Act, EPA proposed to find that the California State Implementation Plan (SIP) for...

  6. 76 FR 69927 - Approval of Air Quality Implementation Plans; California; South Coast; Attainment Plan for 1997...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-09

    ...EPA is approving in part and disapproving in part state implementation plan (SIP) revisions submitted by California to provide for attainment of the 1997 fine particulate matter (PM2.5) national ambient air quality standards in the Los Angeles-South Coast area (South Coast). These SIP revisions are the South Coast 2007 Air Quality Management Plan (South Coast 2007 AQMP) (revised......

  7. 77 FR 58352 - Revisions to the California State Implementation Plan, San Diego County, Antelope Valley and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, San Diego County, Antelope... Antelope Valley Air Quality Management District (AVAQMD) portions of the California State...

  8. 78 FR 10589 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-14

    ... AGENCY 40 CFR Part 52 Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District; Stationary Source Permits AGENCY: Environmental Protection Agency... by California as a revision to the Sacramento Metropolitan Air Quality Management District (SMAQMD...

  9. 75 FR 18143 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Sacramento Metropolitan Air... (SMAQMD) portion of the California State Implementation Plan (SIP). These revisions concern volatile organic compound (VOC) emissions from operations associated with graphic arts coating, can coating...

  10. 76 FR 67396 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution... proposing to approve revisions to the Placer County Air Pollution Control District (PCAPCD) and Sacramento Metro Air Quality Management District (SMAQMD) portions of the California State Implementation Plan...

  11. 76 FR 54384 - California State Implementation Plan, South Coast Air Quality Management District; Withdrawal of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-01

    ... AGENCY 40 CFR Part 52 California State Implementation Plan, South Coast Air Quality Management District... to the California State Implementation Plan (SIP). This revision concerned South Coast Air Quality Management District (SCAQMD) Rule 1143, Consumer Paint Thinner & Multi-Purpose Solvents and Rule 1144,...

  12. 76 FR 31242 - Revisions to the California State Implementation Plan, Santa Barbara County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ... Environmental protection, Air pollution control, Incorporation by reference, Intergovernmental relations... Identification of plan. * * * * * (c) * * * (359) * * * (i) * * * (E) Santa Barbara County Air Pollution Control... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Santa Barbara County...

  13. 77 FR 65133 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-25

    ... Identification of plan. * * * * * (c) * * * (379) * * * (i) * * * (E) Mojave Desert Air Quality Management... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA...

  14. 76 FR 32113 - Revisions to the California State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-03

    ... adopted by local air agencies and submitted by the California Air Resources Board (CARB). Table 1... Board (CARB) Automotive Coatings Suggested Control Methods (SCM), to add prohibitions regarding sale and... Requirements for Implementing NESHAP, EPA-456/R-97-006 and CARB Automotive Coatings SCM. B. Do the rules meet...

  15. 78 FR 63934 - Approval of Air Quality Implementation Plans; California; El Dorado County Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ... AGENCY 40 CFR Part 52 Approval of Air Quality Implementation Plans; California; El Dorado County Air... Plan (SIP) revision submitted by California for the El Dorado County Air Quality Management District... Ambient Air Quality Standards (NAAQS). We are proposing to approve the submitted SIP revision under...

  16. 76 FR 41745 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule... Valley Unified Air Pollution Control District portion of the California State Implementation Plan (SIP... Valley Unified Air Pollution Control District (SJVUAPCD) Rule 4682, Polystyrene, Polyethylene,...

  17. 78 FR 21581 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... the Antelope Valley Air Quality Management District (AVAQMD), Monterey Bay Unified Air...

  18. 76 FR 26192 - Revisions to the California State Implementation Plan, Northern Sonoma County Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-06

    ... Pollution Control District (NSCAPCD) and Mendocino County Air Quality Management District (MCAQMD) AGENCY... approve revisions to the Northern Sonoma County Air Pollution Control District (NSCAPCD) and Mendocino County Air Quality Management District (MCAQMD) portions of the California State Implementation Plan...

  19. 76 FR 26224 - Revisions to the California State Implementation Plan, Northern Sonoma County Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-06

    ... Pollution Control District (NSCAPCD) and Mendocino County Air Quality Management District (MCAQMD) AGENCY... the Northern Sonoma County Air Pollution Control District (NSCAPCD) and Mendocino County Air Quality Management District (MCAQMD) portions of the California State Implementation Plan (SIP). Both districts...

  20. State of California; Approval of State Implementation Plan Revision; Anti-Idling Regulations

    EPA Pesticide Factsheets

    EPA is proposing to approve a revision to the California State Implementation Plan concerning emissions of volatile organic compounds (VOCs), oxides of nitrogen (NOX) and particulate matter (PM) from idling of diesel-powered trucks.

  1. 78 FR 21582 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental... County Air Quality Management District (BCAQMD) and Sacramento Metropolitan Air Quality...

  2. 75 FR 40762 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-14

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District and South Coast Air Quality Management District AGENCY: Environmental... Sacramento Metropolitan Air Quality Management District (SMAQMD) and South Coast Air Quality...

  3. North Coast Unified Air Quality Management District, California; Final Limited Federal Implementation Plan

    EPA Pesticide Factsheets

    EPA is finalizing a limited Federal Implementation Plan (FIP) under the Clean Air Act (CAA or Act) to apply to the North Coast Unified Air Quality Management District (North Coast Unified AQMD or District) in California.

  4. 78 FR 21540 - Revisions to the California State Implementation Plan, Butte County Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Butte County Air Quality Management District and Sacramento Metropolitan Air Quality Management District AGENCY: Environmental... revisions to the Butte County Air Quality Management District (BCAQMD) and Sacramento Metropolitan...

  5. 75 FR 8008 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-23

    ... Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY... Pollution Control District (ICAPCD) portion of the California State Implementation Plan (SIP). These... construction sites, unpaved roads, and disturbed soils in open and agricultural areas. We are proposing...

  6. 75 FR 74517 - Approval and Promulgation of Implementation Plans; State of California; 2008 San Joaquin Valley...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-30

    ... Protection Agency 40 CFR Part 52 Approval and Promulgation of Implementation Plans; State of California; 2008...; ] ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; State of... Strategy; PM . AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is...

  7. 77 FR 58313 - Revisions to the California State Implementation Plan, San Diego County, Antelope Valley and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, San Diego County, Antelope... District (MBUAPCD) and Antelope Valley Air Quality Management District (AVAQMD) portions of the California..., ``Graphic Arts Operations,'' adopted on November 9, 2011 and effective on May 9, 2012. (D) Antelope...

  8. 78 FR 58460 - Revision of Air Quality Implementation Plan; California; Placer County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-24

    ... AGENCY 40 CFR Part 52 Revision of Air Quality Implementation Plan; California; Placer County Air Pollution Control District and Feather River Air Quality Management District; Stationary Source Permits... California as a revision to the Placer County Air Pollution Control District (PCAPCD) and Feather River...

  9. 76 FR 47094 - Revisions to the California State Implementation Plan; South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-04

    ... proposing to approve a revision to the South Coast Air Quality Management District portion of the California... following local rule: South Coast Air Quality Management District Rule 1175, Control of Emissions from the... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan; South Coast Air...

  10. California Enhanced Monitoring; State Implementation Plan (SIP) Revision

    EPA Pesticide Factsheets

    is proposing to approve a SIP revision submitted by the State of California on November 10, 1993 concerning the establishment of a Photochemical Assessment Monitoring System (PAMS) network in six ozone nonattainment areas within California.

  11. 76 FR 30896 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-27

    ... proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of the... overwhelmingly formed as a secondary pollutant. (South Coast 2007 Air Quality Management Plan, page ES-9... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air...

  12. Environmental Assessment, Wing Infrastructure Development Outlook (WINDO) Implementation Plan (FY 04-06). Volume 1, Beale Air Force Base, California

    DTIC Science & Technology

    2005-07-01

    Environmental Assessment Wing Infrastructure Development Outlook (WINDO) Implementation Plan (FY 04-06) Volume 1 Beale Air Force Base, California ...Development Outlook (WINDO) Implementation Plan (FY 04-06) Volume 1 Beale Air Force Base, California 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM...THE PROPOSED ACTION Wing Infrastructure Development Outlook (WINDO) Implementation Plan at Beale Air Force Base (AFB), California : Volume 1

  13. 78 FR 53113 - Approval and Promulgation of Implementation Plans; California; San Joaquin Valley; Contingency...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-28

    ... Board's (CARB's) ``State Strategy for California's 2007 State Implementation Plan'' (``2007 State Strategy''), submitted on November 16, 2007 and revised in 2009 and 2011 through CARB's ``2009 State Strategy Status Report'' \\2\\ and ``2011 Progress Report.'' \\3\\ \\2\\ CARB, ``Status Report on the State...

  14. 77 FR 745 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-06

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) Correction In rule document 2011-33660 appearing on...

  15. 78 FR 37176 - Revisions to the California State Implementation Plan, San Diego Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-20

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, San Diego Air Pollution... proposing to approve a revision to the San Diego Air Pollution Control District (SDAPCD) portion of the... sources under the Clean Air Act (CAA or the Act). DATES: Any comments on this proposal must arrive by...

  16. 75 FR 27975 - Revisions to the California State Implementation Plan; Imperial County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-19

    ...: EPA is proposing to approve revisions to the Imperial County Air Pollution Control District (ICAPCD... of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Intergovernmental... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan; Imperial County...

  17. 78 FR 896 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-07

    ... is finalizing approval of revisions to the Imperial County Air Pollution Control District (ICAPCD...)(2)). List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Imperial County...

  18. 75 FR 1284 - Revisions to the California State Implementation Plan, Ventura County Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-11

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Ventura County Air Pollution... finalizing approval of revisions to the Ventura County Air Pollution Control District (VCAPCD) portion of the...)(2)). List of Subjects in 40 CFR Part 52 Environmental protection, Air pollution...

  19. 77 FR 67322 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-09

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution... proposing to approve revisions to the Placer County Air Pollution Control District (PCAPCD) portion of the... of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Incorporation...

  20. 76 FR 75795 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-05

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution... taking direct final action to approve revisions to the Placer County Air Pollution Control District... CFR Part 52 Environmental protection, Air pollution control, Incorporation by reference, Reporting...

  1. 77 FR 25109 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-27

    ...: EPA is proposing to approve revisions to the Imperial County Air Pollution Control District (ICAPCD... of Subjects in 40 CFR Part 52 Air pollution control, Environmental protection, Intergovernmental... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Imperial County...

  2. 76 FR 75857 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-05

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution... proposing to approve revisions to the Placer County Air Pollution Control District (PCAPCD) portion of the... local rules to regulate these emission sources under the Clean Air Act as amended in 1990 (CAA or...

  3. 78 FR 922 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-07

    ...: EPA is proposing to approve revisions to the Imperial County Air Pollution Control District (ICAPCD... of Subjects in 40 CFR Part 52 Environmental protection, Air pollution control, Intergovernmental... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Imperial County...

  4. 78 FR 6784 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-31

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution... proposing to approve revisions to the Placer County Air Pollution Control District (PCAPCD) portion of the... approve local rules to regulate this emission source under the Clean Air Act (CAA or the Act). DATES:...

  5. 77 FR 7536 - Revisions to the California State Implementation Plan, Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-13

    ... is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control District... 40 CFR Part 52 Environmental protection, Air pollution control, Incorporation by reference, Reporting... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Joaquin Valley Unified...

  6. 76 FR 54993 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-06

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution... proposing a limited approval and limited disapproval of ] revisions to the Placer County Air Pollution... 40 CFR Part 52 Environmental protection, Air pollution control, Intergovernmental relations,...

  7. 76 FR 5319 - Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-31

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control District, Placer County Air Pollution Control District, Antelope Valley Air Quality Management District, and Ventura County Air Pollution Control District AGENCY: Environmental Protection Agency...

  8. 76 FR 17347 - Revision to the California State Implementation Plan, Great Basin Unified Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-29

    ...) * * * (D) Great Basin Unified Air Pollution Control District (1) Rule 201, ``Exemptions,'' adopted on... AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan, Great Basin Unified Air Pollution Control District CFR Correction In Title 40 of the Code of Federal Regulations, Part 52 (Sec....

  9. 75 FR 56942 - Revisions to the California State Implementation Plan, San Diego County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-17

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, San Diego County Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the San Diego Air Pollution Control District...

  10. 75 FR 2079 - Revisions to the California State Implementation Plan, San Joaquin Valley Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-14

    ... facilities. Also, please see our response to CPF comment 3. B. San Joaquin Valley Air Pollution Control...) San Joaquin Valley Unified Air Pollution Control District. (1) Rule 4570, ``Confined Animal Facilities... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, San Joaquin Valley...

  11. 76 FR 61069 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-03

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality Management District, Ventura County Air Pollution Control District, and Placer County Air... (SMAQMD), Ventura County Air Pollution Control District (VCAPCD), and Placer County Air Pollution...

  12. 78 FR 37130 - Revisions to the California State Implementation Plan, San Diego Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-20

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, San Diego Air Pollution... taking direct final action to approve a revision to the San Diego Air Pollution Control District (SDAPCD... Part 52 Environmental protection, Air pollution control, Incorporation by reference,...

  13. 77 FR 2643 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-19

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution... finalizing a limited approval and limited disapproval of revisions to the Placer County Air Pollution Control...) * * * (i) * * * (D) Placer County Air Pollution Control District (1) Rule 233, ``Biomass Boilers,''...

  14. 76 FR 5277 - Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-31

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Santa Barbara Air Pollution Control District, Antelope Valley Air Quality Management District, Ventura County Air Pollution Control District and Placer County Air Pollution Control District AGENCY: Environmental Protection Agency...

  15. 77 FR 73322 - Revisions to the California State Implementation Plan, Monterey Bay Unified Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-10

    ...: EPA is taking direct final action to approve revisions to the Monterey Bay Unified Air Pollution... Part 52 Environmental protection, Air pollution control, Incorporation by reference, Intergovernmental... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Monterey Bay Unified...

  16. 77 FR 73392 - Revisions to the California State Implementation Plan, Monterey Bay Unified Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-10

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Monterey Bay Unified Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Monterey Bay Unified Air Pollution Control...

  17. 78 FR 6736 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-31

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution... taking direct final action to approve revisions to the Placer County Air Pollution Control District..., however, provide for Air Pollution Control Officer (APCO) discretion to allow burning on a No-Burn...

  18. 76 FR 30080 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-24

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution Control District and Ventura County Air Pollution Control District AGENCY: Environmental Protection Agency... Pollution Control District (PCAPCD) and Ventura County Air Pollution Control District (VCAPCD) portion...

  19. 76 FR 68103 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-03

    ... Unified Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the San Joaquin Valley Unified Air Pollution Control... Rulemaking For the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

  20. 78 FR 53249 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution... finalizing approval of revisions to the Placer County Air Pollution Control District (PCAPCD) portion of the... 40 CFR Part 52 Environmental protection, Air pollution control, Incorporation by...

  1. 77 FR 12491 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... revisions to the Antelope Valley Air Quality Management District (AVAQMD) and San Joaquin Valley Unified Air..., 2011, the submittal for Antelope Valley AQMD and SJVUAPCD Negative Declarations submitted on June...

  2. 77 FR 2496 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-18

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the...

  3. 77 FR 2469 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-18

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... to the Antelope Valley Air Quality Management District (AVAQMD) and Imperial County Air Pollution.... * * * * * (G) Antelope Valley Air Quality Management District. (1) Rule 1134, ``Stationary Gas...

  4. 77 FR 12527 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-01

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... Antelope Valley Air Quality Management District (AVAQMD) and San Joaquin Valley Unified Air...

  5. 77 FR 26448 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... approve revisions to the Antelope Valley Air Quality Management District (AVAQMD), Eastern Kern Air... rules were developed as part of the local agency's program to control these pollutants. Antelope...

  6. 78 FR 21545 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality... approve revisions to the Antelope Valley Air Quality Management District (AVAQMD) and Monterey Bay Unified... developed as part of the local agency's program to control these pollutants. Antelope Valley AQMD Rule...

  7. 77 FR 26475 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ... the Antelope Valley Air Quality Management District (AVAQMD), Eastern Kern Air Pollution Control... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Eastern Kern, and Santa Barbara County; Air Pollution Control Districts AGENCY...

  8. 76 FR 30025 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-24

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Placer County Air Pollution Control District and Ventura County Air Pollution Control District AGENCY: Environmental Protection Agency... the Placer County Air Pollution Control District (PCAPCD) and Ventura County Air Pollution...

  9. 76 FR 70888 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-16

    ... finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of the... Quality Management District--SCAQMD) (1) Rule 1143, ``Consumer Paint Thinners & Multi-purpose Solvents... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air...

  10. 76 FR 78829 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-20

    ... taking direct final action to approve a revision to the South Coast Air Quality Management District... Reference (A) South Coast Air Quality Management District (1) Rule 2005, ``New Source Review for RECLAIM... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air...

  11. 76 FR 50128 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  12. 77 FR 47535 - Revisions to the California State Implementation Plan, Sacramento Metropolitan Air Quality...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the Sacramento Metropolitan Air Quality Management District portion of the California State Implementation Plan (SIP). This revision concerns...

  13. 76 FR 41744 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  14. 78 FR 18244 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  15. 77 FR 13495 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-07

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is finalizing approval of revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  16. 76 FR 47074 - Revision to the California State Implementation Plan; South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-04

    ... taking direct final action to approve a revision to the South Coast Air Quality Management District... Air Quality Management District (SCAQMD) Rule 1175, adopted on November 5, 2010, and submitted by the... AGENCY 40 CFR Part 52 Revision to the California State Implementation Plan; South Coast Air...

  17. 76 FR 78871 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-20

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of...

  18. 75 FR 32353 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-08

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District portion of the...

  19. 78 FR 49992 - Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-16

    ... Quality Management District (AVAQMD) and Ventura County Air Pollution Control District (VCAPCD) portions... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Antelope Valley Air Quality Management District and Ventura County Air Pollution Control District AGENCY: Environmental Protection...

  20. 76 FR 41717 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-15

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Direct final rule. SUMMARY: EPA is taking direct final action to approve revisions to the South Coast Air Quality Management...

  1. 76 FR 50891 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-17

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District (SCAQMD) AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA... sources, to achieve emissions reductions milestones, to attain and maintain ambient air quality...

  2. 77 FR 11992 - Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-28

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Mojave Desert Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing a limited approval and limited disapproval of revisions to the Mojave Desert Air...

  3. 75 FR 46880 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-04

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District (SCAQMD) portion of...

  4. 76 FR 72142 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-22

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the South Coast Air Quality Management District portion of the...

  5. 76 FR 44493 - Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-26

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management District, Sacramento Metropolitan Air Quality Management District, and South Coast Air Quality... taking direct final action to approve revisions to the Northern Sierra Air Quality Management...

  6. 76 FR 44535 - Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-26

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Northern Sierra Air Quality Management District, Sacramento Metropolitan Air Quality Management District, and South Coast Air Quality... proposing to approve revisions to the Northern Sierra Air Quality Management District (NSAQMD),...

  7. Environmental Assessment, Wing Infrastructure Development Outlook (WINDO) Implementation Plan (FY 04-06). Volume 2, Beale Air Force Base, California

    DTIC Science & Technology

    2005-08-01

    Environmental Assessment Wing Infrastructure Development Outlook (WINDO) Implementation Plan (FY 04-06) Volume 2 Beale Air Force Base, California ...Development Outlook (WINDO) Implementation Plan (FY 04-06) Volume 2 Beale Air Force Base, California 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM...Beale Air Force Base (AFB). California : Volume 2. 2.0 DESCRIPTION OF PROPOSED ACTION AND NO ACTION ALTERNATIVES Proposed Action. The Proposed Action

  8. Environmental protection Implementation Plan

    SciTech Connect

    R. C. Holland

    1999-12-01

    This ``Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ``Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities.

  9. 77 FR 7535 - Revisions to the California State Implementation Plan, California Air Resources Board-Consumer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-13

    ... is finalizing approval of revisions to the California Air Resources Board (CARB) portion of the..., letter dated October 7, 2011 clarified that while amendments to CARB Test Method 310 was included in the January 28, 2011 submittal package to EPA, CARB did not intend for Method 310 to be acted on as a SIP...

  10. 76 FR 27613 - Revisions to the California State Implementation Plan, California Air Resources Board-Consumer...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-12

    ... amended regulations were submitted on February 16, 2010, by the Governor's designee. (i) Incorporation by... evaluation. II. Public Comments and EPA Responses EPA's proposed action provided a 30-day public comment... regulations. The submitted comment is not germane to this action as amendments to California's...

  11. 76 FR 40652 - Approval and Promulgation of Implementation Plans; California Air Resources Board-In-Use Heavy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-11

    ...EPA is proposing to approve revisions to the California State Implementation Plan (SIP) that EPA expects to be submitted by the California Air Resources Board (CARB or Board). These revisions concern three regulations that reduce emissions of diesel particulate matter (PM), oxides of nitrogen (NOX), sulfur dioxide (SO2) and other pollutants from in-use, heavy-duty diesel- fueled trucks and buses and from ocean-going vessels (OGV) operating within California jurisdiction. This proposed approval is based on proposed regulations submitted by CARB and an accompanying request to proceed with SIP review while the State completes its public review and agency adoption process. EPA will not take final action on the regulations until California submits the final adopted versions to EPA as a revision to the California SIP. Final EPA approval of the regulations and incorporation of them into the California SIP would make them federally enforceable. We are providing a 30-day comment period for today's proposal.

  12. 76 FR 48006 - Limited Federal Implementation Plan; Prevention of Significant Deterioration; California; North...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-08

    ...; California; North Coast Unified Air Quality Management District AGENCY: Environmental Protection Agency (EPA... Coast Unified Air Quality Management District (NCUAQMD) portion of the California State Implementation... Act (CAA) section 110(a)(2)(D)(i) for the 1997 8-hour ozone National Ambient Air Quality...

  13. 77 FR 23133 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-18

    ... taking direct final action to approve revisions to the Yolo-Solano Air Quality Management District (Yolo.... * * * * * (381) * * * (i) * * * (I) Yolo-Solano Air Quality Management District. (1) Rule 2.3, ``Ringelmann Chart... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo- Solano Air...

  14. 75 FR 19923 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-16

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Yolo-Solano Air Quality Management District (YSAQMD) portion of...

  15. 77 FR 23193 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-18

    ... AGENCY 40 CFR Part 52 Revisions to the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Yolo-Solano Air Quality Management District portion of the...

  16. 77 FR 74355 - Approval of Air Quality Implementation Plans; California; San Joaquin Valley; Attainment Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ..., 2012. FOR FURTHER INFORMATION CONTACT: Frances Wicher, Air Planning Office (AIR-2), U.S. Environmental Protection Agency, Region 9, (415) 972- 3957, wicher.frances@epa.gov . SUPPLEMENTARY INFORMATION:...

  17. 77 FR 32483 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... State Implementation Plan (SIP). This revision concerns particulate matter (PM) emissions from cement... Reductions of Particulate Emissions from Cement Manufacturing Facilities. In the Rules and Regulations...

  18. Implementing Local Accountability in California's Schools: The First Year of Planning

    ERIC Educational Resources Information Center

    Warren, Paul; Carrillo, Giselle

    2015-01-01

    The passage of the Local Control Funding Formula (LCFF) in 2013 gave California school districts flexibility in allocating resources and significantly boosted state support for the education of disadvantaged students. LCFF also includes a Local Control and Accountability Plan (LCAP), which requires districts to enlist the help of parents and the…

  19. Implementing Local Accountability in California's Schools: The First Year of Planning

    ERIC Educational Resources Information Center

    Warren, Paul; Carrillo, Giselle

    2015-01-01

    The passage of the Local Control Funding Formula (LCFF) in 2013 gave California school districts flexibility in allocating resources and significantly boosted state support for the education of disadvantaged students. LCFF also includes a Local Control and Accountability Plan (LCAP), which requires districts to enlist the help of parents and the…

  20. 75 FR 1716 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-13

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule... Valley Unified Air Pollution Control District (SJVUAPCD) portion of the California State Implementation... authority to regulate sources of air pollution. The fee provision of CAA section 185 acts as an...

  1. 76 FR 298 - Revisions to the California State Implementation Plan, San Joaquin Valley Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-04

    ... Valley Unified Air Pollution Control District (SJVUAPCD) portion of the California State Implementation......... 12/17/92 08/24/07 On September 17, 2007, the submittal for San Joaquin Valley Unified Air Pollution... require that fixed covers be equipped with a 95% efficient Air Pollution Control (APC) device. c....

  2. 75 FR 60623 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule... Valley Unified Air Pollution Control District (SJVUAPCD) portion of the California State Implementation... Ventura County Air Pollution Control District (VCAPCD) Rule 74.15 (as amended November 8, 1994)....

  3. How do we know how many salmon returned to spawn? Implementing the California Coastal salmonid monitoring plan in Mendocino County, California

    Treesearch

    Sean P. Gallagher; David W. Wright

    2012-01-01

    California's coastal salmon and steelhead populations are listed under California and Federal Endangered Species Acts; both require monitoring to provide measures of recovery. Since 2004 the California Department of Fish and Game and NOAA Fisheries have been developing a monitoring plan for California¡¯s coastal salmonids (the California Coastal Salmonid...

  4. Environmental Assessment for Implementation of the Installation Development Plan at Edwards Air Force Base, California

    DTIC Science & Technology

    2017-05-01

    violation of any State and Federal Endangered Species Acts through the unauthorized take of a listed species .  Document all such training and...permitting related to that activity; • Do not result in the violation of any state and federal Endangered Species Acts through the unauthorized take of a...governments or those in planning processes as endangered , threated, or otherwise of conservation concern, including: • Species listed by the California

  5. 77 FR 66548 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is approving revisions to the San Joaquin Valley Unified Air Pollution Control District... State Implementation Plan, San Joaquin Valley Unified Air Pollution Control District's Rule 4352,...

  6. State of California; Approval of State Implementation Plan Revision; Enhanced Monitoring

    EPA Pesticide Factsheets

    EPA is taking final action to approve a California SIP revision submitted by the California 11/10/1996 concerning establishment of a Photochemical Assessment Monitoring System (PAMS) network in six ozone nonattainment areas within California.

  7. 78 FR 75293 - Approval and Promulgation of Implementation Plans; State of California; 2012 Los Angeles County...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-11

    ..., 2015. Attainment demonstration state implementation plans (SIPs) are due 18 ] months after the..., 2015. Under section 172(a)(2)(D), the Administrator is precluded from granting an extension of this... required to demonstrate attainment by December 31, 2015 would need to have all necessary controls in place...

  8. 77 FR 72968 - Revisions to the California State Implementation Plan, for Imperial County, Placer County and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-07

    ... County and Ventura County Air Pollution Control Districts AGENCY: Environmental Protection Agency (EPA... Imperial County Air Pollution Control District (ICAPCD), Placer County Air Pollution Control District (PCAPCD) and Ventura County Air Pollution Control District (PCAPCD) portions of the California...

  9. 78 FR 53680 - Revisions to the California State Implementation Plan, Placer, Santa Barbara and Ventura County...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-30

    ... Ventura County Air Pollution Control Districts AGENCY: Environmental Protection Agency (EPA). ACTION... Air Pollution Control District (PCAPCD), Santa Barbara County Air Pollution Control District (SBCAPCD) and Ventura County Air Pollution Control District (VCAPCD) portions of the California...

  10. Placer and Ventura County Air Pollution Control Districts; Proposed Revisions to California State Implementation Plan

    EPA Pesticide Factsheets

    EPA proposing revisions to Placer County Air Pollution Control District (PCAPCD) and Ventura County Air Pollution Control District (VCAPCD) portions of the California SIP concerning emissions of oxides of nitrogen (NOX).

  11. 76 FR 14616 - Approval and Promulgation of Implementation Plans; State of California; Interstate Transport of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-17

    ... meteorology that results in stagnant conditions (i.e., not conducive to ozone transport) and that, on occasion... statement that, given geography, meteorology, and topography in the western U.S., ``PM 2.5 and 8-hour ozone... area, topographical features and meteorology support a finding that California sources do not...

  12. 77 FR 73320 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-10

    ... Management District; Prevention of Significant Deterioration; Greenhouse Gases AGENCY: Environmental... Greenhouse Gases into the California SIP. The submitted revision is a permitting rule that contains the... sources of greenhouse gases (GHGs) as required by Part C of title I of the Clean Air Act. In addition...

  13. 77 FR 66780 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-07

    ... California Air Resources Board (CARB). Table 1--Submitted Rules Local agency Rule No. Rule title Amended... to the SIP- approved version on June 3, 2011 and CARB submitted them to us on September 27, 2011. C... Control Measure for Architectural Coatings,'' CARB, October 2007. 4. ``Improving Air Quality with Economic...

  14. 76 FR 39777 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollutions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-07

    ... Air Pollutions Control District (SJVUAPCD) AGENCY: Environmental Protection Agency (EPA). ACTION... San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) portion of the California State... Rule 344 D.2.b.2 require that fixed covers be equipped with a 95% efficient Air Pollution Control...

  15. California Mobile Source Regulations; Final Approval and Promulgation of Implementation Plans

    EPA Pesticide Factsheets

    EPA is taking direct final action to approve a revision to the California SIP establishing standards and other requirements relating to the control of emissions from new on-road and new and in-use off-road vehicles and engines.

  16. 75 FR 39365 - Revisions to the California State Implementation Plan, Imperial County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-08

    ... business hours with the contact listed in the FOR FURTHER INFORMATION CONTACT section. FOR FURTHER...). Ayron Moiola, Executive Director, Coalition of Labor, Agriculture & Business, March 24, 2010 (COLAB..., California--April 12, 2007 [enclosed with June 13, 2008 letter to Sean Hogan]. ] Natural Event Documentation...

  17. 77 FR 71551 - Approval and Promulgation of Implementation Plans; California; Determinations of Attainment for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-03

    ... NAAQ, the basis for the suspension of the requirements for that area, provided by 40 CFR 51.918, would... for that area, provided by 40 CFR 51.918, would no longer exist, and the violating ozone nonattainment... areas in California. First, EPA is determining that six 8-hour ozone nonattainment areas in...

  18. 76 FR 34872 - Approval and Promulgation of Implementation Plans; State of California; Regional Haze and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-15

    ... FR 14616) and related Technical Support Document, both of which can be found in the docket for today... completed the application process for TAS under the Clean Water Act. Finally, the Tribes claim that, if EPA... commenters provide no specific factual or analytical support for their claim that emissions from California...

  19. 76 FR 28944 - Revisions to the California State Implementation Plan, Placer County Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-19

    ... hard copy at EPA Region IX, 75 Hawthorne Street, San Francisco, California. While all documents are listed at http://www.regulations.gov , some information ] may be publicly available only at the hard copy... available in either location (e.g., CBI). To inspect the hard copy materials, please schedule an...

  20. 78 FR 18849 - Disapproval of Implementation Plan Revisions; State of California; South Coast VMT Emissions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-28

    ... INFORMATION CONTACT section below. FOR FURTHER INFORMATION CONTACT: Wienke Tax, Air Planning Office, U.S... (November 6, 1991). Extreme areas were subject to the most stringent planning requirements and were provided the most time to attain the standard. The various ozone planning requirements to which Extreme ozone...

  1. 77 FR 74372 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-14

    ... realities that could arise during program implementation, even if the result might affect fees owed... credits and thus a virtual cessation of permitting activity for large industrial sources in nonattainment...

  2. 77 FR 56775 - Approval and Promulgation of Implementation Plans; California; Determinations of Attainment for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-14

    ... CFR 50.10. This 3-year average is referred to as the design value. When the design value is less than... network plan to EPA for approval.\\13\\ EPA also concluded \\14\\ from its Technical System Audit of the CARB... Audit of CARB's ambient air monitoring program). \\15\\ See, e.g., letter from Karen Magliano, Chief,...

  3. 77 FR 50021 - Revisions to the California State Implementation Plan, San Joaquin Valley Unified Air Pollution...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-20

    ... Air Pollution Control District AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: In this action, EPA is finalizing approval of San Joaquin Valley Unified Air Pollution Control... plans that are specifically tailored to the nature of the air pollution sources in each state. The...

  4. 75 FR 3996 - Revisions to the California State Implementation Plan, San Joaquin Valley Air Pollution Control...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-26

    ... Planning, San Joaquin Valley Air Pollution Control District; letter dated and received August 17, 2009... Sadredin, Executive Director/Air Pollution Control Officer of San Joaquin Valley Air Pollution Control...: EPA's Analysis of San Joaquin Valley Unified Air Pollution Control District's Rule 4684,...

  5. Development of an Implementation Plan for Atmospheric Carbon Monitoring in California

    SciTech Connect

    Fischer, Marc L.; Riley, William J.; Tonse, Shaheen

    2004-10-01

    This report describes the design of atmospheric CO{sub 2} concentration measurements that, in combination with other measurements and models, would be used to quantify regionally distributed CO{sub 2} exchanges from California's terrestrial ecosystems and CO{sub 2} emissions from fossil fuel combustion. Using models of net ecosystem CO{sub 2} exchange (NEE), fossil fuel CO{sub 2} emissions, and regional meteorology, we predict CO{sub 2} concentration ''signals'' in the atmosphere. The predictions of NEE exhibit spatial and temporal variations that are controlled by land cover and climate. Fossil fuel CO{sub 2} emissions from metropolitan areas are the strongest localized sources of CO{sub 2} while weaker but spatially extensive fossil emissions are present throughout the Central Valley. We subdivide the CO{sub 2} sources into four components: NEE inside and outside CA, and fossil fuel CO{sub 2} inside and outside CA. Maps of predicted atmospheric CO{sub 2} concentration signals from these four sources largely mirror the instantaneous emissions near strong sources but plumes of CO{sub 2} enriched or depleted air are predicted to advect far from their sources. We then identify a baseline set of observing stations from existing and possible future sites that could be used to characterize in-state and out-of-state ecosystem and fossil fuel contributions to atmospheric CO{sub 2} concentrations. For each of the stations we calculate mean midday concentration signals with standard deviation for each month and source. We also calculate the covariance of the signal due to NEE inside CA with each of the other signals to quantify how much of the signal from NEE inside CA might be readily separable from the other signals. On the basis of these predictions, we identify new observing stations and a measurement protocol that, in combination with existing stations, would provide data to estimate NEE within CA. Although beyond the scope of this project, future work should estimate

  6. California State Implementation Plan; Los Angeles-South Coast Air Basin; Interim Final Determination To Defer Sanctions

    EPA Pesticide Factsheets

    EPA is making an interim final determination to defer the imposition of offset and highway sanctions in the Los Angeles-South Coast air basin based on a proposed approval of revisions to the California SIP.

  7. Implementation of Title V in California

    SciTech Connect

    Werner, B.; Cook, B.

    1996-12-31

    This presentation provides information on California`s Title V operating permit programs for stationary sources mandated by the 1990 Clean Air Act amendments. It covers background, applicability, regulatory history, requirements, and issues. In addition, specific information is provided on the progress of Title V implementation in California, including: the roles of implementing agencies, the status of district Title V programs, number and distribution of Title V sources, cost of Title V implementation, and highlights of Title V implementation in the State. The question and answer format is intended to facilitate easy access to specific information related to the Title V operating permit programs in California.

  8. Strategic implementation plan

    NASA Technical Reports Server (NTRS)

    1989-01-01

    The Life Science Division of the NASA Office of Space Science and Applications (OSSA) describes its plans for assuring the health, safety, and productivity of astronauts in space, and its plans for acquiring further fundamental scientific knowledge concerning space life sciences. This strategic implementation plan details OSSA's goals, objectives, and planned initiatives. The following areas of interest are identified: operational medicine; biomedical research; space biology; exobiology; biospheric research; controlled ecological life support; flight programs and advance technology development; the life sciences educational program; and earth benefits from space life sciences.

  9. 77 FR 20308 - Approval and Promulgation of Implementations Plans; California Air Resources Board-In-Use Heavy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-04

    ..., 2011 (76 FR 40652), EPA proposed to approve title 13, California Code of Regulations (CCR), section... for this detailed information. See 76 FR at 40653- 40654. The regulations were developed by CARB to... and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); Does not impose an...

  10. Environmental Implementation Plan

    SciTech Connect

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  11. Environmental Implementation Plan

    SciTech Connect

    Not Available

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  12. 76 FR 69895 - Approval and Promulgation of Implementation Plans; California; 2008 San Joaquin Valley PM2.5

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-09

    ... words, the effect of model bias is minimized when it is accounted for at both end points, the base and... demonstration and associated air quality modeling, base year emissions inventory; air quality modeling; and.... Based on this evaluation, we have concluded that the Plan's 2005 base year emissions inventory was based...

  13. Energy Shortage Contingency Plan. (California Energy Commission)

    SciTech Connect

    Not Available

    1994-03-01

    The California Energy Commission's 1993 Energy Shortage Contingency Plan is prepared in response to state legislative requirements. The statute directs the California Energy Commission to prepare and submit to the Governor and Legislature contingency plans to deal with possible shortages of electrical energy or fuel supplies to protect public health, safety and welfare.

  14. Environmental Implementation Plan

    SciTech Connect

    Not Available

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  15. Advanced Planning for Tsunamis in California

    NASA Astrophysics Data System (ADS)

    Miller, K.; Wilson, R. I.; Larkin, D.; Reade, S.; Carnathan, D.; Davis, M.; Nicolini, T.; Johnson, L.; Boldt, E.; Tardy, A.

    2013-12-01

    The California Tsunami Program is comprised of the California Governor's Office of Emergency Services (CalOES) and the California Geological Survey (CGS) and funded through the National Tsunami Hazard Mitigation Program (NTHMP) and the Federal Emergency Management Agency (FEMA). The program works closely with the 20 coastal counties in California, as well as academic, and industry experts to improve tsunami preparedness and mitigation in shoreline communities. Inundation maps depicting 'worst case' inundation modeled from plausible sources around the Pacific were released in 2009 and have provided a foundation for public evacuation and emergency response planning in California. Experience during recent tsunamis impacting the state (Japan 2011, Chile 2010, Samoa 2009) has brought to light the desire by emergency managers and decision makers for even more detailed information ahead of future tsunamis. A solution to provide enhanced information has been development of 'playbooks' to plan for a variety of expected tsunami scenarios. Elevation 'playbook' lines can be useful for partial tsunami evacuations when enough information about forecast amplitude and arrival times is available to coastal communities and there is sufficient time to make more educated decisions about who to evacuate for a given scenario or actual event. NOAA-issued Tsunami Alert Bulletins received in advance of a distant event will contain an expected wave height (a number) for each given section of coast. Provision of four elevation lines for possible inundation enables planning for different evacuation scenarios based on the above number potentially alleviating the need for an 'all or nothing' decision with regard to evacuation. Additionally an analytical tool called FASTER is being developed to integrate storm, tides, modeling errors, and local tsunami run-up potential with the forecasted tsunami amplitudes in real-time when a tsunami Alert is sent out. Both of these products will help

  16. TRUPACT-1 implementation plan

    SciTech Connect

    Hurley, J.D.; Tappen, J.J. . Joint Integration Office); Christensen, D.S. )

    1985-09-01

    TRUPACT-1, the TRansUranic PACkage Transporter is a packaging designed to transport defense contact handled transuranic (CH-TRU) waste from generating and interim TRU waste storage facilities to the Waste Isolation Pilot Plant (WIPP). Prior to fabrication and procurement of a full fleet, an initial design (TRUPACT-1) will be introduced to the defense TRU waste complex through use in an operational prototype fleet which will consist of Units 1, 2, and 3. In an effort to provide a relatively smooth introduction of the TRUPACT-1, the TRUPACT Technical Team (TTT) has developed the following implementation plan. The plan provides detailed information on user handling opportunities, schedules, equipment, responsibilities, reporting and data collection activities to be performed. The intent of this document is to provide users of the TRUPACT-1 with a guidance document, complete with references, that will allow the smooth introduction of this new transportation system by providing the information necessary for collecting operational, performance and cost data. These data will be used in modeling and full fleet design and procurement activities. In addition, these data will help fine tune procedures in the inspection and maintenance document and the operational document. Additional objectives of this plan are to aid in the establishment of site operational, inspection and maintenance procedures as well as training of site operators and briefing state and local officials.

  17. Implementation of ecological assessment in southern California

    SciTech Connect

    Pierce, R.S.; Ruiter, T.L. |

    1994-12-31

    Under the Department of Defense Installation Restoration Program for the Navy, an ecological assessment was undertaken as part of a remedial investigation at a southern California naval facility. The work plan that was implemented was the result of negotiation and collaboration between the Navy and federal and state natural resource regulatory agencies. The facility is located on a natural lagoon connected to the Pacific Ocean and supported by a large tidal wetland system. In addition to issues related to the intrinsic values of the wetlands, the agencies were concerned about the effects of implementation of the studies on several special status species that use the facility. The ecological assessment involved sampling of vegetation, mammals, fish, benthos, sediment, and water at eight sites. In addition, a bathymetric survey and tidal study of the lagoon were undertaken to support the studies. Sampling was constrained by the anticipated and early presence of special status species. Coordination of the field program was critical to minimizing impact on the special status species and completing the sampling by the required end date. Initial sampling resulted in recommendations for the remainder of the ecological assessment and the identification of potential interim actions that would provide early restoration of habitat on the facility.

  18. Conduct of operations implementation plan

    SciTech Connect

    Anderson, C.K.; Hall, R.L.

    1991-02-20

    This implementation plan describes the process and provides information and schedules that are necessary to implement and comply with the Department of Energy (DOE) Order 5480.19, {open_quotes}Conduct of Operations{close_quotes} (CoOp). This plan applies to all Pinellas Plant operations and personnel. Generally, this Plan discusses how DOE Order 5480.19 will be implemented at the Pinellas Plant.

  19. 77 FR 36287 - Proposed Low-Effect Habitat Conservation Plan for the California Tiger Salamander, Calaveras...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-18

    ... Fish and Wildlife Service Proposed Low-Effect Habitat Conservation Plan for the California Tiger... listed animal, the threatened Central California Distinct Population Segment of the California tiger salamander (tiger salamander). The applicant would implement a conservation program to minimize and mitigate...

  20. Air Quality Implementation Plans

    EPA Pesticide Factsheets

    States must develop plans to attain and maintain air quality standards. These plans, known as SIPs, are submitted to EPA for approval. This web site contains information about this process and the current status of the submittals.

  1. Implementing California's Law on Assisted Dying.

    PubMed

    Mishra, Ruchika

    2017-03-01

    On October 5, 2015, Governor Jerry Brown approved bill ABX2 15, the End of Life Option Act, making California the fifth state in the country to allow physician-assisted dying. The law was modeled after Oregon's 1997 Death with Dignity Act. When the legislative special session ended on March 10, 2016, California health care providers had only ninety days to respond to the state mandate before the law would take effect, on June 9, 2016. Experience with the law so far suggests several challenges with implementation.

  2. Environmental implementation plan

    SciTech Connect

    Peterson, G.L.

    1994-10-04

    In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities.

  3. Arroyo Management Plan (Alameda County): A Plan for Implementing Access and Restoring Riparian Habitats

    Treesearch

    Kent E. Watson; Jim Horner; Louise Mozingo

    1989-01-01

    Innovative techniques for restoring riparian habitats are of little value without a community endorsed plan for their implementation. A flood control district commissioned the Arroyo Management Plan in order to determine how it might provide public access and improve habitat along its current and future channels in a fast-growing area of Northern California. The Plan,...

  4. Owens Valley Serious Area Plan for the 1987 24-Hour PM10; Final Approval of California Air Plan

    EPA Pesticide Factsheets

    EPA is taking final action to approve a state implementation plan (SIP) revision submitted by the State of California to meet Clean Air Act equirements applicable to the Owens Valley PM10 nonattainment area.

  5. Higher Education in California: New Goals for the Master Plan

    ERIC Educational Resources Information Center

    Johnson, Hans

    2010-01-01

    Fifty years ago, state policymakers and higher education officials adopted California's Master Plan for Higher Education. This plan still largely defines policies concerning the state's public higher education systems: the California community colleges (CCC), the California State University (CSU) system, and the University of California (UC)…

  6. Operational Energy Strategy: Implementation Plan

    DTIC Science & Technology

    2012-03-01

    Operational Energy Strategy: Implementation Plan Department of Defense March 2012 2011 - 2012. Generated on...2012. Cost estimate generated on October 21, 2011 0816 RefID: 3-9BCEC11 Report Documentation Page Form ApprovedOMB No. 0704-0188 Public...the Marine Corps. While all activities in this Implementation Plan will begin over the next 12 months, each will generate outcomes over the near

  7. Implementation plan for operating alternatives for the Naval Computer and Telecommunications Station cogeneration facility at Naval Air Station North Island, San Diego, California

    SciTech Connect

    Carroll, D.M.; Parker, S.A.; Stucky, D.J.

    1994-04-01

    The goal of the US Department of Energy (DOE) Federal Energy Management Program (FEMP) is to facilitate energy efficiency improvements at federal facilities. This is accomplished by a balanced program of technology development, facility assessment, and use of cost-sharing procurement mechanisms. Technology development focuses upon the tools, software, and procedures used to identify and evaluate energy efficiency technologies and improvements. For facility assessment, FEMP provides metering equipment and trained analysts to federal agencies exhibiting a commitment to improve energy use efficiency. To assist in procurement of energy efficiency measures, FEMP helps federal agencies devise and implement performance contracting and utility demand-side management strategies. Pacific Northwest Laboratory (PNL) supports the FEMP mission of energy systems modernization. Under this charter, the Laboratory and its contractors work with federal facility energy managers to assess and implement energy efficiency improvements at federal facilities nationwide. The SouthWestern Division of the Naval Facilities Engineering Command, in cooperation with FEMP, has tasked PNL with developing a plan for implementing recommended modifications to the Naval Computer and Telecommunications Station (NCTS) cogeneration plant at the Naval Air Station North Island (NASNI) in San Diego. That plan is detailed in this report.

  8. Western Mojave Desert, Rate of Progress Demonstration; Proposed Approval of California Air Plan Revision

    EPA Pesticide Factsheets

    EPA is proposing to approve a state implementation plan revision submitted by the State of California to meet Clean Air Act requirements applicable to the Western Mojave Desert (WMD) ozone nonattainment area.

  9. San Joaquin Valley Unified Air Pollution Control District; Proposed Approval of California Air Plan Revision

    EPA Pesticide Factsheets

    EPA is proposing to approve a revision to the SJVUAPCD portion of the California State Implementation Plan (SIP) concerning emissions of oxides of nitrogen (NOX) and particulate matter (PM) from boilers, steam generators, and process heaters.

  10. San Joaquin Valley Unified Air Pollution Control District; Approval of California Air Plan Revisions

    EPA Pesticide Factsheets

    EPA is taking final action to approve a revision to the San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD or “the District”) portion of the California State Implementation Plan (SIP).

  11. Antelope Valley Air Quality Management District; Approval of California Air Plan Revisions

    EPA Pesticide Factsheets

    EPA is proposing to approve and conditionally approve revisions to the Antelope Valley Air Quality Management District (AVAQMD or “District”) portion of the California State Implementation Plan (SIP).

  12. Bakersfield Metropolitan Statistical Area; Partial Approval of California Air Plan Revisions

    EPA Pesticide Factsheets

    EPA is proposing to approve a portion of a implementation plan submission from the California regarding Clean Air Act requirements for ambient ozone monitoring in the Bakersfield Metropolitan Statistical Area (MSA).

  13. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 3 2014-04-01 2013-04-01 true Implementation plan. 598.605 Section... Grants § 598.605 Implementation plan. (a) Implementation plan content. An EZ must submit an implementation plan for HUD approval that addresses each project or activity proposed to be undertaken by the...

  14. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 3 2013-04-01 2013-04-01 false Implementation plan. 598.605... Empowerment Zone Grants § 598.605 Implementation plan. (a) Implementation plan content. An EZ must submit an implementation plan for HUD approval that addresses each project or activity proposed to be undertaken by the...

  15. 340 Facility maintenance implementation plan

    SciTech Connect

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements.

  16. GENERAL SITE PLAN, HAMILTON AIR FORCE BASE, MARIN COUNTY, CALIFORNIA. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    GENERAL SITE PLAN, HAMILTON AIR FORCE BASE, MARIN COUNTY, CALIFORNIA. Pencil on paper, dated December 4, 1952. Also marked "PWC 103474." By J.Y. Long Company, Engineers, Oakland, California - Hamilton Field, East of Nave Drive, Novato, Marin County, CA

  17. 40 CFR 52.274 - California air pollution emergency plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 3 2011-07-01 2011-07-01 false California air pollution emergency plan... pollution emergency plan. (a) Since the California Air Pollution Emergency Plan does not provide complete... District (SCAQMD). (2) Sacramento County Air Pollution Control District. (3) Monterey Bay Unified...

  18. 40 CFR 52.274 - California air pollution emergency plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 3 2012-07-01 2012-07-01 false California air pollution emergency plan... pollution emergency plan. (a) Since the California Air Pollution Emergency Plan does not provide complete... District (SCAQMD). (2) Sacramento County Air Pollution Control District. (3) Monterey Bay Unified...

  19. Land Use Control Implementation Plan

    NASA Technical Reports Server (NTRS)

    Starr, Andrew Scott

    2015-01-01

    This Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of Building M7-505 of institutional controls that have been implemented at the site. Although there are no current unacceptable risks to human health or the environment associated with Building M7-505, institutional land use controls (LUCs) are necessary to prohibit the use of groundwater from the site. LUCs are also necessary to prevent access to soil under electrical equipment in the northwest portion of the site. Controls necessary to prevent human exposure will include periodic inspection, condition certification, and agency notification.

  20. 10 CFR 820.65 - Implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Implementation plan. 820.65 Section 820.65 Energy... plan. With respect to a DOE Nuclear Safety Requirement for which there is no regulatory provision for an implementation plan or schedule, an exemption may be granted to establish an implementation plan...

  1. Total Quality Management Implementation Plan.

    DTIC Science & Technology

    1989-06-01

    E 14. SUBJECT TERMS 15. NUMBER OF PAGES TOM ( Total Quality Management ), Continuous Process Improvement,_________ Depot Operations, Supply Support 16... Quality Management Implementation Plan 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING ORGANIZATION Defense General...Reduction PrOtect (O704.Ot8SL Wasilngton, OC 20503j. .EPORT DATE 3. REPORT TYPE AND DATES COVERED June 19891 4. TITLE AND SUBTITLE S. FUNDING NUMBERS Total

  2. 78 FR 28747 - Approval and Promulgation of Implementation Plans; North Carolina; State Implementation Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; North Carolina; State Implementation Plan Miscellaneous Revisions AGENCY: Environmental Protection Agency (EPA). ACTION: Direct Final... Carolina State Implementation Plan (SIP) submitted on February 3, 2010, through the North...

  3. 80 FR 60952 - Positive Train Control Safety Plan for the Southern California Regional Rail Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2015-10-08

    ... PTCSP describes the SCRRA I-ETMS implementation and the associated I- ETMS safety processes; safety...-2010-0048] Positive Train Control Safety Plan for the Southern California Regional Rail Authority... Positive Train Control Safety Plan (PTCSP) Version 1.7 for approval under the Federal railroad...

  4. Enterprise Resource Planning Systems: Assessment of Risk Factors by California Community College Leaders

    ERIC Educational Resources Information Center

    Valente, Mario Manuel

    2011-01-01

    Most California Community Colleges have chosen to purchase and implement a Management Information Systems software solution also known as an Enterprise Resource Planning (ERP) system in order to monitor, control, and automate their administrative tasks. ERP implementations are complex, expensive, high profile, and therefore high risk. To reduce…

  5. Enterprise Resource Planning Systems: Assessment of Risk Factors by California Community College Leaders

    ERIC Educational Resources Information Center

    Valente, Mario Manuel

    2011-01-01

    Most California Community Colleges have chosen to purchase and implement a Management Information Systems software solution also known as an Enterprise Resource Planning (ERP) system in order to monitor, control, and automate their administrative tasks. ERP implementations are complex, expensive, high profile, and therefore high risk. To reduce…

  6. 10 CFR 820.65 - Implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Implementation plan. 820.65 Section 820.65 Energy... plan. With respect to a DOE Nuclear Safety Requirement for which there is no regulatory provision for an implementation plan or schedule, an exemption may be granted to establish an implementation...

  7. Tsunami Preparedness, Response, Mitigation, and Recovery Planning in California

    NASA Astrophysics Data System (ADS)

    Miller, K.; Wilson, R. I.; Johnson, L. A.; Mccrink, T. P.; Schaffer, E.; Bower, D.; Davis, M.

    2016-12-01

    In California officials of state, federal, and local governments have coordinated to implement a Tsunami Preparedness and Mitigation Program. Building upon past preparedness efforts carried out year-round this group has leveraged government support at all levels. A primary goal is for everyone who lives at or visits the coast to understand basic life-safety measures when responding to official tsunami alerts or natural warnings. Preparedness actions include: observation of National Tsunami Preparedness Week, local "tsunami walk" drills, scenario-based exercises, testing of notification systems for public alert messaging, outreach materials, workshops, presentations, and media events.Program partners have worked together to develop emergency operations, evacuation plans, and tsunami annexes to plans for counties, cities, communities, and harbors in 20 counties along the coast. Working with the state and federal partner agencies, coastal communities have begun to incorporate sophisticated tsunami "Playbook" scenario information into their planning. These innovative tsunami evacuation and response tools provide detailed evacuation maps and associated real-time response information for identifying areas where flooding could occur. This is critical information for evacuating populations on land, near the shoreline.Acting on recommendations from the recent USGS-led, multi-discipline Science Application for Risk Reduction Tsunami Scenario report on impacts to California and American Society of Civil Engineering adoption proposals to the International Building Code, the state has begun to develop a strategy to incorporate probabilistic tsunami findings into state level policy recommendations for addressing building code adoption, as well as approach land use planning and building code implementation in local jurisdictions. Additional efforts, in the context of sustained community resiliency, include developing recovery planning guidance for local communities.

  8. Planning Targets for Phase II Watershed Implementation Plans

    EPA Pesticide Factsheets

    On August 1, 2011, EPA provided planning targets for nitrogen, phosphorus and sediment for the Phase II Watershed Implementation Plans (WIPs) of the Chesapeake Bay TMDL. This page provides the letters containing those planning targets.

  9. The California Unified Contingency Plan: A format for integrating state and federal oil spill and hazardous substance requirements

    SciTech Connect

    Wines, H.H. III

    1998-12-31

    The California Unified Contingency Plan is a format, modeled after the federal Integrated Contingency Plan guidance, that allows facilities subject to two or more oil spill and hazardous substance requirements, under either federal regulation or California law, to meet all of those requirements in a single comprehensive emergency response and planning document. Oil spill response plans which can be consolidated under this format include the California Marine Facility Contingency Plan, the federal Spill Prevention. Control and Countermeasure (SPCC) Plan and associated Facility Response Plan required by the Oil Pollution Act of 1990 (OPA-90), as well as any other federal or state planning requirements concerning petroleum, hazardous substances and hazardous wastes. Use of the california Unified Contingency Plan will minimize duplication in the preparation and implementation of emergency response plans and will improve economic efficiency for both the regulated and regulating communities. California`s regulatory agencies have been statutorily mandated to accept contingency plans prepared under this format. Regulations concerning oil spill prevention overlap wit h regulations concerning hazardous substances, and both overlap with still more regulations. Implementation of the California Unified Contingency Plan will now make it possible to eliminate this redundancy and provide the state with both internal consistency and regulatory harmony with the rest of the nation.

  10. Tradable renewable energy credits in California: the struggle with implementation

    SciTech Connect

    Hilton, Seth D.; Marriott, Chad T.

    2010-07-15

    On Mar. 11, 2010, the California Public Utilities Commission authorized the use of tradable renewable energy credits to satisfy at least a portion of the obligations imposed by California's Renewables Portfolio Standard. The decision allows California's largest investor-owned utilities and other retail providers to purchase TRECs to meet up to 25 percent of their annual RPS compliance obligations, but implementation has raised a series of questions. (author)

  11. Individualized Career Plan (ICP): Implementation Manual.

    ERIC Educational Resources Information Center

    Batsche, Catherine; And Others

    This implementation manual was designed to assist local education agency personnel implement the individualized career plan (ICP) concept in high schools. Questions commonly asked about the ICP are answered. Guidelines are then provided for implementing the four stages of the process: planning, developing, implementing, and evaluating/refining.…

  12. Schedule optimization study implementation plan

    SciTech Connect

    Not Available

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed.

  13. McClellan Air Force Base Operable Unit B, Two-Phase Extraction System Demonstration Test, Work Implementation Plan for McClellan AFB, California

    DTIC Science & Technology

    1994-08-03

    TechnologyI Evaluation (SITE), and the Public-Private Partners. Table 11-1 also is a breakdown of the equipment, materials, and installation costs...Safety, Section 5.2. 1.). IDuring the planning/ mobilization phase of the program, the contractor shall consult with base personnel about the location

  14. System Strategic Plan for the California Community Colleges: Preparing the Foundation for California's Future. 2013 Update

    ERIC Educational Resources Information Center

    California Community Colleges, Chancellor's Office, 2013

    2013-01-01

    The "System Strategic Plan for the California Community Colleges" provides a comprehensive road map for restoring student access and improving student success. The Plan addresses the major demographic, economic and educational challenges that California will face over the coming decades. It presents clear system goals, specific…

  15. Approved Air Quality Implementation Plans in Region 10

    EPA Pesticide Factsheets

    Landing page for information about EPA-approved air quality State Implementation Plans (SIPs), Tribal Implementation Plans (TIPs), and Federal Implementation Plans (FIPs) in Alaska, Idaho, Oregon, Washington.

  16. California Education: Planning for a Better Future

    ERIC Educational Resources Information Center

    Larsen, Eric; Weston, Margaret

    2011-01-01

    Proficiency rates among California students continue to rise. At the end of the 2009-10 school year, the share of students who demonstrated proficiency on the California Standards Test was greater than 50 percent in both English language arts (ELA) and math. California's proficiency rates have increased more than 18 percentage points over the last…

  17. California Education: Planning for a Better Future

    ERIC Educational Resources Information Center

    Larsen, Eric; Weston, Margaret

    2011-01-01

    Proficiency rates among California students continue to rise. At the end of the 2009-10 school year, the share of students who demonstrated proficiency on the California Standards Test was greater than 50 percent in both English language arts (ELA) and math. California's proficiency rates have increased more than 18 percentage points over the last…

  18. Facility Planning for Technology Implementation.

    ERIC Educational Resources Information Center

    Ross, Tweed W.; Stewart, G. Kent

    1993-01-01

    When planning new school buildings or modifications to existing structures, checking facility planning in relation to technology planning is critical. Areas requiring serious attention include space, electricity, lighting, security, furnishings, shielding, and acoustics. (MLF)

  19. Facility Planning for Technology Implementation.

    ERIC Educational Resources Information Center

    Ross, Tweed W.; Stewart, G. Kent

    1993-01-01

    When planning new school buildings or modifications to existing structures, checking facility planning in relation to technology planning is critical. Areas requiring serious attention include space, electricity, lighting, security, furnishings, shielding, and acoustics. (MLF)

  20. Developing and Implementing a Marketing Plan.

    ERIC Educational Resources Information Center

    McCalmon, Byron G.

    1987-01-01

    A program focusing on recruitment of new freshmen at the University of Colorado at Boulder illustrates some major planning considerations in the development, implementation, and evaluation of a marketing plan. (MSE)

  1. 77 FR 1669 - Endangered and Threatened Species; Recovery Plan for the Southern California Steelhead Distinct...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-11

    ... Plan for the Southern California Steelhead Distinct Population Segment AGENCY: National Marine... (ESA) recovery plan for the Southern California Steelhead (Oncorhynchus mykiss) Distinct Population.... mykiss were most closely related to the more northern populations of the Southern California Steelhead...

  2. The Research and Planning Prospectus for California Community Colleges.

    ERIC Educational Resources Information Center

    RP Group of California Community Colleges, Santa Ana.

    To help researchers and planners, college governing bodies, and state-wide entities gain perspective on myriad events and initiatives impacting California Community Colleges (CCC) and higher education in general, the Research and Planning (RP) Group for California Community Colleges developed this prospectus. The final draft prospectus identifies…

  3. BENDING SHOP & OVEN. United Engineering Co., Alameda, California. Plan, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    BENDING SHOP & OVEN. United Engineering Co., Alameda, California. Plan, two elevations, sections, and details. Alben Froberg, Architect, Oakland, California. Sheet no. 1 of 1. Various scales. December 15, 1941. pencil on tracing paper - United Engineering Company Shipyard, Bending Shop & Oven, 2900 Main Street, Alameda, Alameda County, CA

  4. The Kaiser Permanente Northern California Enhanced Recovery After Surgery Program: Design, Development, and Implementation

    PubMed Central

    Liu, Vincent X; Rosas, Efren; Hwang, Judith C; Cain, Eric; Foss-Durant, Anne; Clopp, Molly; Huang, Mengfei; Mustille, Alexander; Reyes, Vivian M; Paulson, Shirley S; Caughey, Michelle; Parodi, Stephen

    2017-01-01

    Complications are common after surgery, highlighting the need for innovations that reduce postsurgical morbidity and mortality. In this report, we describe the design, development, and implementation of an Enhanced Recovery After Surgery program in the Kaiser Permanente Northern California integrated health care delivery system. This program was implemented and disseminated in 2014, targeting patients who underwent elective colorectal resection and those who underwent emergent hip fracture repair across 20 Medical Centers. The program leveraged multidisciplinary and broad-based leadership, high-quality data and analytic infrastructure, patient-centered education, and regional-local mentorship alignment. This program has already had an impact on more than 17,000 patients in Northern California. It is now in its fourth phase of planning and implementation, expanding Enhanced Recovery pathways to all surgical patients across Kaiser Permanente Northern California. PMID:28746028

  5. 50 CFR 600.1008 - Implementation plan and implementation regulations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... implementation plan and implementation regulations for a financed program on the business plan. The... program, including: (1) The reduction fishery; (2) The reduction methodology; (3) The maximum reduction... methodology; (3) The maximum reduction cost; (4) The reduction-cost funding, if any, other than Federal...

  6. Knocking Down Barriers: How California Superintendents Are Implementing Blended Learning

    ERIC Educational Resources Information Center

    Horn, Michael B.; Gu, Anna; Evans, Meg

    2014-01-01

    School districts across the United States are implementing blended learning to boost student achievement. The authors convened several California school district superintendents to answer the questions: "What are the barriers, real or perceived, to implementing blended learning in your district?" and "Have you found solutions to or…

  7. Career Academy Programs in California: Outcomes and Implementation. CPRC Report.

    ERIC Educational Resources Information Center

    Maxwell, Nan L.; Rubin, Victor

    The outcomes and implementation of career academy programs in California were examined in a study of one school district's efforts to implement a uniform career academy model in 1990-1996. A cohort of approximately 10,000 students who were sophomores in the district's comprehensive high schools between 1990 and 1993 were followed through high…

  8. Technology II: Implementation Planning Guide.

    ERIC Educational Resources Information Center

    California Community Colleges, Sacramento. Office of the Chancellor.

    The California Community Colleges (CCC) are facing a number of challenges, including the explosive use of the Internet, the digital divide, the need for integrating technology into teaching and learning, the impact of Tidal Wave II, and the need to ensure that technology is accessible to persons with disabilities. The CCCs' Technology II Strategic…

  9. How California Prepared for Implementation of Physician-Assisted Death: A Primer.

    PubMed

    Petrillo, Laura A; Dzeng, Elizabeth; Harrison, Krista L; Forbes, Lindsay; Scribner, Benjamin; Koenig, Barbara A

    2017-06-01

    Physician-assisted death is now legal in California, and similar laws are being considered in many other states. The California law includes safeguards, yet health care providers will face practical and ethical issues while implementing physician-assisted death that are not addressed by the law. To help providers and health care facilities in California prepare to provide optimal care to patients who inquire about physician-assisted death, we brought together experts from California, Oregon, and Washington. We convened a conference of 112 stakeholders in December 2015, and herein present their recommendations. Themes of recommendations regarding implementation include (1) institutions should develop and revise physician-assisted death policies; (2) legal physician-assisted death will have implications for California's culturally and socioeconomically diverse population, and for patients from vulnerable groups; (3) conscientious objection and moral distress for health care providers must be considered; and (4) palliative care is essential to the response to the law. The expert conference participants' insights are a valuable guide, both for providers and health care facilities in California planning or revising their response, and for other jurisdictions where physician-assisted death laws are being considered or implemented.

  10. California Master Plan for Migrant Education, 1976 Edition (Plan Maestro de California para Educacion Migrante, Edicion de 1976).

    ERIC Educational Resources Information Center

    California State Dept. of Education, Sacramento. Div. of Compensatory Education.

    Based on the national migrant education plan, California's master plan aims to mobilize the necessary State and Federal resources, and to unify and assist the efforts of local educational agencies to end the migrant child's failure in school. The plan includes provisions for: instructional activities on a regular and extended year basis designed…

  11. California Plan for Career-Vocational Education. Part I: Policy Directions.

    ERIC Educational Resources Information Center

    California Community Colleges, Sacramento. Office of the Chancellor.

    Designed to establish a unified mission for career-vocational education in California, this report identifies issues and goals and defines major priorities for program implementation at state and local levels. Following introductory sections on the focus, scope, and purpose of the plan, section I discusses the basic assumptions behind…

  12. 78 FR 44494 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-24

    ...EPA is proposing to approve, as a revision of the California state implementation plan, the State's request to redesignate the Sacramento nonattainment area to attainment for the 24-hour particulate matter of ten microns or less (PM10) National Ambient Air Quality Standard (NAAQS). EPA is also proposing to approve the PM10 maintenance plan and the associated motor vehicle emissions budgets for use in transportation conformity determinations necessary for the Sacramento area. Finally, EPA is proposing to approve the attainment year emissions inventory. EPA is proposing these actions because the SIP revision meets the requirements of the Clean Air Act and EPA guidance for such plans and motor vehicle emissions budgets.

  13. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... URBAN DEVELOPMENT COMMUNITY FACILITIES URBAN EMPOWERMENT ZONES: ROUND TWO AND THREE DESIGNATIONS Empowerment Zone Grants § 598.605 Implementation plan. (a) Implementation plan content. An EZ must submit an... requirements that the state and local governments, as Empowerment Zone designees, have agreed to meet...

  14. 40 CFR 51.851 - State implementation plan (SIP) or Tribal implementation plan (TIP) revision.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 2 2012-07-01 2012-07-01 false State implementation plan (SIP) or... § 51.851 State implementation plan (SIP) or Tribal implementation plan (TIP) revision. (a) A State or... requirements, to demonstrate conformity with the applicable SIP or TIP as required by section 176(c) of the...

  15. 40 CFR 51.851 - State implementation plan (SIP) or Tribal implementation plan (TIP) revision.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 2 2013-07-01 2013-07-01 false State implementation plan (SIP) or... § 51.851 State implementation plan (SIP) or Tribal implementation plan (TIP) revision. (a) A State or... requirements, to demonstrate conformity with the applicable SIP or TIP as required by section 176(c) of the...

  16. 40 CFR 51.851 - State implementation plan (SIP) or Tribal implementation plan (TIP) revision.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 2 2014-07-01 2014-07-01 false State implementation plan (SIP) or... § 51.851 State implementation plan (SIP) or Tribal implementation plan (TIP) revision. (a) A State or... requirements, to demonstrate conformity with the applicable SIP or TIP as required by section 176(c) of the...

  17. 40 CFR 51.851 - State implementation plan (SIP) or Tribal implementation plan (TIP) revision.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 2 2011-07-01 2011-07-01 false State implementation plan (SIP) or... § 51.851 State implementation plan (SIP) or Tribal implementation plan (TIP) revision. (a) A State or... requirements, to demonstrate conformity with the applicable SIP or TIP as required by section 176(c) of the...

  18. Medicaid beneficiaries in california reported less positive experiences when assigned to a managed care plan.

    PubMed

    McDonnell, Diana D; Graham, Carrie L

    2015-03-01

    In 2011 California began transitioning approximately 340,000 seniors and people with disabilities from Medicaid fee-for-service (FFS) to Medicaid managed care plans. When beneficiaries did not actively choose a managed care plan, the state assigned them to one using an algorithm based on their previous FFS primary and specialty care use. When no clear link could be established, beneficiaries were assigned by default to a managed care plan based on weighted randomization. In this article we report the results of a telephone survey of 1,521 seniors and people with disabilities enrolled in Medi-Cal (California Medicaid) and who were recently transitioned to a managed care plan. We found that 48 percent chose their own plan, 11 percent were assigned to a plan by algorithm, and 41 percent were assigned to a plan by default. People in the latter two categories reported being similarly less positive about their experiences compared to beneficiaries who actively chose a plan. Many states in addition to California are implementing mandatory transitions of Medicaid-only beneficiaries to managed care plans. Our results highlight the importance of encouraging beneficiaries to actively choose their health plan; when beneficiaries do not choose, states should employ robust intelligent assignment algorithms. Project HOPE—The People-to-People Health Foundation, Inc.

  19. Savannah River Site environmental implementation plan

    SciTech Connect

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  20. Savannah River Site Environmental Implementation Plan

    SciTech Connect

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  1. The California Institute for Energy Efficiency multiyear research plan, 1992--1996

    SciTech Connect

    Not Available

    1992-07-01

    The mission of the California Institute for Energy Efficiency (CIEE) is to coordinate, plan, and implement a statewide program of medium- to long-term (five to fifteen years) applied research aimed at advancing the energy efficiency and productivity of all end-use sectors in California. The focus of CIEE's multiyear research and development (R D) program is to benefit California's ratepayers within the context of the state's energy, environmental, and economic needs and priorities. This context includes the current research efforts of CIEE's sponsors, of significant national R D organizations, and of industry. CIEE's 1992--1996 Multiyear Research Plan guides the Institute's research development, research management, and technology transfer efforts. The Plan briefly describes CIEE's current R D program and introduces potential R D initiatives that are responsive to California's unmet energy efficiency needs. In 1992, CIEE is planning, funding, and managing $5 million in multiyear research, exploratory research, Director's discretionary research, and technology transfer activities. The Institute's 1992 effort includes $3.6 million in multiyear research conducted in the Building Energy Efficiency, Air Quality Impacts of Energy Efficiency, and End-Use Resource Planning programs and $1 million in exploratory and Director's discretionary research. During the period 1992 to 1996, CIEE will continue to conduct energy efficiency R D that will secure sustainable, affordable energy for California while improving the state's economy and environment.

  2. Life in Presidial California. Lesson Plan.

    ERIC Educational Resources Information Center

    Lothrop, Gloria Ricci; Herczog, Michelle

    2000-01-01

    Provides background information on the presidio, a frontier palace or garrison. Offers a lesson to help students understand the chronological context of events in presidial California in relation to developments in the English colonies and Europe. Includes four handouts. (CMK)

  3. Plan to Improve Student Attendance in California Public Schools.

    ERIC Educational Resources Information Center

    California State Dept. of Education, Sacramento.

    The plan described in this report was developed in response to language in the 1979 Budget Act that required the California Department of Education to development a comprehensive plan for addressing problems in administering the state's attendance laws and attendance accounting requirements. The current attendance accounting procedures and…

  4. 75 FR 54031 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-03

    ...; Designation of Areas for Air Quality Planning Purposes; State of California; PM-10; Redesignation of the Coso Junction Planning Area to Attainment; Approval of PM-10 Maintenance Plan for the Coso Junction Planning... State of California's request to redesignate the Coso Junction planning area (CJPA) to attainment...

  5. How California Prepared for Implementation of Physician-Assisted Death: A Primer

    PubMed Central

    Petrillo, Laura A.; Dzeng, Elizabeth; Harrison, Krista L.; Forbes, Lindsay; Scribner, Benjamin; Koenig, Barbara A.

    2017-01-01

    Physician-assisted death is now legal in California, and similar laws are being considered in many other states. The California law includes safeguards, yet health care providers will face practical and ethical issues while implementing physician-assisted death that are not addressed by the law. To help providers and health care facilities in California prepare to provide optimal care to patients who inquire about physician-assisted death, we brought together experts from California, Oregon, and Washington. We convened a conference of 112 stakeholders in December 2015, and herein present their recommendations. Themes of recommendations regarding implementation include (1) institutions should develop and revise physician-assisted death policies; (2) legal physician-assisted death will have implications for California’s culturally and socioeconomically diverse population, and for patients from vulnerable groups; (3) conscientious objection and moral distress for health care providers must be considered; and (4) palliative care is essential to the response to the law. The expert conference participants’ insights are a valuable guide, both for providers and health care facilities in California planning or revising their response, and for other jurisdictions where physician-assisted death laws are being considered or implemented. PMID:28426307

  6. State Implementation Plan (SIP) Checklist Guide

    EPA Pesticide Factsheets

    Guidance documents and examples to assist air quality agencies of non-attainment areas in developing plans to implement national ambient air quality standards (NAAQS), including the ground-level ozone standard.

  7. Chesapeake Bay Watershed Implementation Plans (WIPs)

    EPA Pesticide Factsheets

    This page provides an overview of Watershed Implementation Plans (WIP) and how they play an important role in restoring the Chesapeake Bay. The page also provides links to each jurisdiction's Phase I, II, and III WIP.

  8. A Structured Process for Implementing Strategic Planning.

    ERIC Educational Resources Information Center

    Goodin, Penny G.; Myers, William S.; Nichols, W. Randolph

    1998-01-01

    The Chesapeake (Virginia) Public Schools developed a strategic school-improvement plan with 178 recommendations representing certain goals: school safety, standards, effectiveness, efficiency, staff training, technology integration, community involvement, and facilities. The implementation process consisted of assigning responsibilities,…

  9. Lead State Implementation Plan (SIP) Checklist Guide

    EPA Pesticide Factsheets

    Guidance documents and examples to assist air quality agencies of non-attainment areas in developing plans to implement national ambient air quality standards (NAAQS), including the lead air emissions standard.

  10. PM State Implementation Plan (SIP) Checklist Guide

    EPA Pesticide Factsheets

    Guidance documents and examples to assist air quality agencies of non-attainment areas in developing plans to implement national ambient air quality standards (NAAQS), including the PM air emissions standard.

  11. The California Institute for Energy Efficiency multiyear research plan, 1992--1996

    SciTech Connect

    Not Available

    1992-07-01

    The mission of the California Institute for Energy Efficiency (CIEE) is to coordinate, plan, and implement a statewide program of medium- to long-term (five to fifteen years) applied research aimed at advancing the energy efficiency and productivity of all end-use sectors in California. The focus of CIEE`s multiyear research and development (R&D) program is to benefit California`s ratepayers within the context of the state`s energy, environmental, and economic needs and priorities. This context includes the current research efforts of CIEE`s sponsors, of significant national R&D organizations, and of industry. CIEE`s 1992--1996 Multiyear Research Plan guides the Institute`s research development, research management, and technology transfer efforts. The Plan briefly describes CIEE`s current R&D program and introduces potential R&D initiatives that are responsive to California`s unmet energy efficiency needs. In 1992, CIEE is planning, funding, and managing $5 million in multiyear research, exploratory research, Director`s discretionary research, and technology transfer activities. The Institute`s 1992 effort includes $3.6 million in multiyear research conducted in the Building Energy Efficiency, Air Quality Impacts of Energy Efficiency, and End-Use Resource Planning programs and $1 million in exploratory and Director`s discretionary research. During the period 1992 to 1996, CIEE will continue to conduct energy efficiency R&D that will secure sustainable, affordable energy for California while improving the state`s economy and environment.

  12. Tactical Fuel and Energy Implementation Plan

    DTIC Science & Technology

    2010-09-24

    Technologies Corporation, in a briefing titled “ Software Modeling and Validation of a Microgrid ,” delivered to the Alternative Energy NOW Conference, Orlando...and Energy Implementation Plan 2 This plan is focused on the tactical environment, defined as maneuver brigade combat team (BCT) and below. The...Soldiers must clearly understand what is expected of them, and must know how to implement the new behaviors, once they have been defined

  13. SEPARATIONS AND WASTE FORMS CAMPAIGN IMPLEMENTATION PLAN

    SciTech Connect

    Vienna, John D.; Todd, Terry A.; Peterson, Mary E.

    2012-11-26

    This Separations and Waste Forms Campaign Implementation Plan provides summary level detail describing how the Campaign will achieve the objectives set-forth by the Fuel Cycle Reasearch and Development (FCRD) Program. This implementation plan will be maintained as a living document and will be updated as needed in response to changes or progress in separations and waste forms research and the FCRD Program priorities.

  14. State Plans for Implementing Programs of Study

    ERIC Educational Resources Information Center

    Lewis, Morgan V.; Overman, Laura

    2008-01-01

    This article examines how the states plan to implement the Programs of Study (POS) that were mandated by the 2006 reauthorization of the federal legislation for career and technical education. A coding system was developed for summarizing the methods described in the plans of all 50 states, the District of Columbia, Guam, and the Virgin Islands.…

  15. State Plans for Implementing Programs of Study

    ERIC Educational Resources Information Center

    Lewis, Morgan V.; Overman, Laura

    2008-01-01

    This article examines how the states plan to implement the Programs of Study (POS) that were mandated by the 2006 reauthorization of the federal legislation for career and technical education. A coding system was developed for summarizing the methods described in the plans of all 50 states, the District of Columbia, Guam, and the Virgin Islands.…

  16. Planning and Implementing Career Education Programs: Perspectives.

    ERIC Educational Resources Information Center

    Crim, Alonzo A.; And Others

    The collection of six papers offers perspectives on planning and implementing career education programs. The first paper, the Introduction (David Goodwin), deals with program implementation. The second paper, Priorities in Career Education (Alonzo A. Crim), describes the historical origins of career education in the Atlanta school system with a…

  17. Planning and Implementing a Global Studies Curriculum.

    ERIC Educational Resources Information Center

    Helmkamp, Caroline J.

    This report on the experimental Northeast Global Studies Middle Magnet School in Kansas City, Missouri, discusses the planning and implementation of a global studies curriculum to be implemented by the school. The 1990-1991 school year was the school's first as a magnet school under a consent decree issued by a federal judge. The decree was…

  18. Waste generator services implementation plan

    SciTech Connect

    Mousseau, J.; Magleby, M.; Litus, M.

    1998-04-01

    Recurring waste management noncompliance problems have spurred a fundamental site-wide process revision to characterize and disposition wastes at the Idaho National Engineering and Environmental Laboratory. The reengineered method, termed Waste Generator Services, will streamline the waste acceptance process and provide waste generators comprehensive waste management services through a single, accountable organization to manage and disposition wastes in a timely, cost-effective, and compliant manner. This report outlines the strategy for implementing Waste Generator Services across the INEEL. It documents the culmination of efforts worked by the LMITCO Environmental Management Compliance Reengineering project team since October 1997. These efforts have included defining problems associated with the INEEL waste management process; identifying commercial best management practices; completing a review of DOE Complex-wide waste management training requirements; and involving others through an Integrated Process Team approach to provide recommendations on process flow, funding/charging mechanisms, and WGS organization. The report defines the work that will be performed by Waste Generator Services, the organization and resources, the waste acceptance process flow, the funding approach, methods for measuring performance, and the implementation schedule and approach. Field deployment will occur first at the Idaho Chemical Processing Plant in June 1998. Beginning in Fiscal Year 1999, Waste Generator Services will be deployed at the other major INEEL facilities in a phased approach, with implementation completed by March 1999.

  19. 40 CFR 49.10166 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-Region X Implementation Plan for the Jamestown S'klallam Tribe of Washington § 49.10166 Contents of implementation plan. The implementation plan for the Reservation of the Jamestown S'Klallam Tribe consists of...

  20. 40 CFR 49.10166 - Contents of implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-Region X Implementation Plan for the Jamestown S'klallam Tribe of Washington § 49.10166 Contents of implementation plan. The implementation plan for the Reservation of the Jamestown S'Klallam Tribe consists of...

  1. 40 CFR 49.10166 - Contents of implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-Region X Implementation Plan for the Jamestown S'klallam Tribe of Washington § 49.10166 Contents of implementation plan. The implementation plan for the Reservation of the Jamestown S'Klallam Tribe consists of...

  2. 40 CFR 49.10256 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-Region X Implementation Plan for the Kootenai Tribe of Idaho § 49.10256 Contents of implementation plan. The implementation plan for the Reservation of the Kootenai Tribe of Idaho consists of the following...

  3. 40 CFR 49.10256 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-Region X Implementation Plan for the Kootenai Tribe of Idaho § 49.10256 Contents of implementation plan. The implementation plan for the Reservation of the Kootenai Tribe of Idaho consists of the following...

  4. 40 CFR 49.10046 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10046 Contents of implementation plan. The implementation plan for the Reservation of the Cow Creek Band of Umpqua Indians consists...

  5. 40 CFR 49.10046 - Contents of implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10046 Contents of implementation plan. The implementation plan for the Reservation of the Cow Creek Band of Umpqua Indians consists...

  6. 40 CFR 49.10046 - Contents of implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10046 Contents of implementation plan. The implementation plan for the Reservation of the Cow Creek Band of Umpqua Indians consists...

  7. 40 CFR 49.10046 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10046 Contents of implementation plan. The implementation plan for the Reservation of the Cow Creek Band of Umpqua Indians consists...

  8. 40 CFR 49.11076 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...-Region X Implementation Plan for the Confederated Tribes of the Warm Springs Reservation of Oregon § 49.11076 Contents of implementation plan. The implementation plan for the Warm Springs Reservation...

  9. 40 CFR 49.11076 - Contents of implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...-Region X Implementation Plan for the Confederated Tribes of the Warm Springs Reservation of Oregon § 49.11076 Contents of implementation plan. The implementation plan for the Warm Springs Reservation...

  10. 40 CFR 49.11076 - Contents of implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...-Region X Implementation Plan for the Confederated Tribes of the Warm Springs Reservation of Oregon § 49.11076 Contents of implementation plan. The implementation plan for the Warm Springs Reservation...

  11. Oracle accrual plans from requirements to implementation

    SciTech Connect

    Rivera, Christine K

    2009-01-01

    Implementing any new business software can be an intimidating prospect and this paper is intended to offer some insight in to how to approach this challenge with some fundamental rules for success. Los Alamos National Laboratory (LANL) had undergone an original ERP implementation of HRMS, Oracle Advanced Benefits, Worker Self Service, Manager Self Service, Project Accounting, Financials and PO, and recently completed a project to implement Oracle Payroll, Time and Labor and Accrual Plans. This paper will describe some of the important lessons that can be applied to any implementation as a whole, and then specifically how this knowledge was applied to the design and deployment of Oracle Accrual Plans for LANL. Finally, detail on the functionality available in Oracle Accrual Plans will be described, as well as the detailed setups.that were utilized at LANL.

  12. Implementing a Drug Formulary for California's Workers' Compensation Program.

    PubMed

    Wynn, Barbara O; Buttorff, Christine; Meza, Erika; Taylor, Erin Audrey; Mulcahy, Andrew W

    2017-06-01

    California Assembly Bill 1124 required the state's Division of Workers' Compensation in the Department of Industrial Relations to establish a drug formulary for all injured workers covered by the state's workers' compensation program. Such formularies serve to reinforce safe and effective prescribing patterns for practitioners and payers. In California, the formulary will need to be consistent with the Medical Treatment Utilization Schedule guidelines that define medically appropriate care for California's injured workers, create incentives to encourage prescribing of medically appropriate drugs, and reduce the administrative burdens associated with utilization review and medical necessity disputes. The objective of this study is to support the Division of Workers' Compensation in establishing the formulary. The authors compare and evaluate the strengths and weaknesses of four existing formularies and the formulary used by California's Medicaid program. The authors then analyze the issues involved in structuring the drug formulary for California to be consistent with the treatment guidelines, explore related policies that should be addressed in implementing the formulary, and offer recommendations.

  13. 77 FR 16447 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-21

    ... Quality Planning Purposes; State of California; Ozone; Nitrogen Dioxide; Technical Amendments AGENCY... classifications of certain areas in California for the 1971 annual nitrogen dioxide standard and the 1997 eight...

  14. Defense Special Case Transuranic Waste Implementation Plan

    SciTech Connect

    Pierce, G.D. . Joint Integration Office); Carson, P.H. Corp., Boulder, CO )

    1987-06-01

    The purpose of the Special Case Implementation Plan (SCIP) is to establish a comprehensive plan for the efficient long-term management and disposal of defense special case (SC) transuranic (TRU) waste. To fulfill this purpose, a review of SC waste management strategies (at both the site-specific and TRU program levels), waste characteristics and inventories, processing and transportation options, and disposal requirements was made. This review provides a plan for implementing policy decisions and useful information for making those decisions. The SCIP is intended to provide a baseline plant to which alternate plans can be compared. General potential alternatives are provided for future consideration when data concerning facility availability and costs are better defined. Milestones for the SC Implementation Plan are included which summarize each SC waste site. The cost of implementing the SC program has an upper limit of $89 million for the worst case scenario. The actual cost of implementation could be dramatically lower than the worst case figure. 15 refs., 3 figs., 12 tabs.

  15. California Community Colleges Technology II Strategic Plan, 2000-2005.

    ERIC Educational Resources Information Center

    California Community Colleges, Sacramento. Office of the Chancellor.

    This Strategic Plan aims to address the issues facing California Community Colleges (CCCs) due to new technology. The issues raised by the report include: (1) the pervasive and economically and socially necessary use of the Internet; (2) the digital divide; (3) the need for integrating technology into teaching and learning; (4) the impact of Tidal…

  16. Evaluation of Integrated Planning Systems in California Community Colleges

    ERIC Educational Resources Information Center

    Buckley, Jerry L.; Piland, William E.

    2012-01-01

    California community colleges are experiencing unprecedented levels of sanctions from their accrediting agency. A survey of planners in these colleges reveals a wide gap between current practice and perceived importance of integrated planning practices, as well as misalignment in budgeting methods. Statistically significant gaps were identified…

  17. California Master Plan for Special Education--An Update.

    ERIC Educational Resources Information Center

    Pillsbury, Charles A.; Maitland, Anne M.

    The report updates aspects of the 1977 report on California's Master Plan for Special Education. Reasons are sought for the intense debate over state funding for special education, which has substantially increased over recent years while special education enrollments have increased only modestly. In visits to nearly 100 local education agencies,…

  18. Planning for a Better Future: California 2025. 2011 Update

    ERIC Educational Resources Information Center

    Public Policy Institute of California, 2011

    2011-01-01

    California's current economic and fiscal realities make nonpartisan, objective information on the state's future challenges all the more critical. Understandably, the search is on for immediate solutions to the unprecedented crises people face today. But if the present crises make policymakers shelve long-term planning, the result may be an even…

  19. California Master Plan for Special Education--An Update.

    ERIC Educational Resources Information Center

    Pillsbury, Charles A.; Maitland, Anne M.

    The report updates aspects of the 1977 report on California's Master Plan for Special Education. Reasons are sought for the intense debate over state funding for special education, which has substantially increased over recent years while special education enrollments have increased only modestly. In visits to nearly 100 local education agencies,…

  20. Planning for a Better Future: California 2025. 2011 Update

    ERIC Educational Resources Information Center

    Public Policy Institute of California, 2011

    2011-01-01

    California's current economic and fiscal realities make nonpartisan, objective information on the state's future challenges all the more critical. Understandably, the search is on for immediate solutions to the unprecedented crises people face today. But if the present crises make policymakers shelve long-term planning, the result may be an even…

  1. California's disposal plan goes nowhere fast

    SciTech Connect

    Cohen, J.

    1994-02-18

    California desperately needs a place to store as much as 5.5 million cubic feet of low-level radioactive waste over the next 30 years. Ward Valley, a barren stretch of the Mojave Desert located some 250 miles east of Los Angeles, was supposed to be that place. Last year, trenches dug in the arid, seismically stable valley were supposed to be that place. Last year, trenches dug in the arid, seismically stable valley were supposed to begin holding wastes like the gadolinium-153 used to detect osteoporosis and the selenium-75 used to study proteins, as well as wastes from nuclear power plants. But construction crews haven't even begun to dig, because Ward Valley has become ground zero in the fierce national debate over radioactive waste disposal. Lawsuits filed by opponents, who fear the waste will contaminate the environment, and the intervention of influential politicians such as Sen. Barbara Boxer (D-CA) have blocked the Interior Department from selling the federally owned Ward Valley land to California to begin construction. As a result, universities, biotechnology companies, and hospitals may be stuck with wastes piling up at their institutions, which could have repercussions.

  2. NERSC Strategic Implementation Plan 2002-2006

    SciTech Connect

    Kramer, William; Bethel, Wes; Craw, James; Draney, Brent; Fortney, William; Gorda, Brend; Harris, William; Meyer, Nancy; Ng, Esmond; Verdier, Francesca; Walter, Howard; Welcome, Tammy

    2002-09-01

    This strategic proposal presents NERSC's vision for its activities and new directions over the next five years. NERSC's continuing commitment to providing high-end systems and comprehensive scientific support for its users will be enhanced, and these activities will be augmented by two new strategic thrusts: support for Scientific Challenge Teams and deployment of a Unified Science Environment. The proposal is in two volumes, the Strategic Plan and the Implementation Plan.

  3. Maintenance implementation plan for solid waste management

    SciTech Connect

    Reddinger, R.W., Westinghouse Hanford

    1996-06-27

    This Maintenance Implementation Plan (MIP)was developed for implementation of the U.S. Department of Energy (DOE) Order 4330.4A, A Maintenance Implementation Program (DOE 1990) which has been replaced by 4330.4B (DOE 1994) at the Hanford Site SWM complex. It addresses maintenance functions associated with SWM, which includes the field operational group and the facilities operational group. An assessment of the existing maintenance programs for SWM was performed, and the results of this assessment were evaluated to determine corrective actions required to bring Solid Waste Maintenance into compliance with the order. The objective of this MIP is to provide baseline information for the control and execution of SWM Maintenance activities relative to the requirements of Order 4330.4B, Chapter II. (Nuclear Facilities) It also describes actions that are planned to achieve compliance. Section 2.0 of this MIP summarizes the mission, history, and future plans of SWM. Section 3.0 describes maintenance scope and requirements, and outlines the overall strategy (both near- term and long-term) for implementing improvements to the maintenance program. Specific elements of DOE Order 4330.4B are addressed in Section 4.0, including objectives of each element, a discussion of how SWM addresses these objectives, proposed improvements, and references to Westinghouse Hanford Company (Westinghouse Hanford) policies and procedures. Section 5.0 addresses deviations from policy requirements, and Section 6.0 presents the implementation schedule for planned improvements.

  4. Lawrence Berkeley Laboratory Self-Assessment Program: Implementation Plan

    SciTech Connect

    Not Available

    1992-06-01

    The Lawrence Berkeley Laboratory (LBL) Self-Assessment Program provides a formal process for assuring quality and regulatory compliance in all facets of Laboratory operations. The program, which integrates the ongoing self-assessment activities of the individual Divisions and Offices in a comprehensive, top-to-bottom process, provides assistance to the US Department of Energy (DOE), the University of California, and Laboratory management in their appraisals of Laboratory performance. This document describes the program goals, scope, responsibilities, elements, and implementation schedule. This document is also the implementation plan for the institutional level self-assessment program. Each Division is also required to develop a self-assessment program that contains the elements described in this document.

  5. PLAN: Shared Automated Circulation System in California.

    ERIC Educational Resources Information Center

    Kershner, Lois

    1983-01-01

    Background information about Peninsula Library Automated Network member libraries and description of the circulation system of choice include basic components of this cooperative effort: Joint Powers Agreement and organizational structure; jurisdiction responsibilities and financial planning; database and policy areas requiring joint decision;…

  6. 40 CFR 209.10 - Approval of plan, implementation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Approval of plan, implementation. (a) If the Administrator finds that the remedial plan is designed to... 40 Protection of Environment 25 2011-07-01 2011-07-01 false Approval of plan, implementation. 209... implementation of the approved plan upon receipt of notice from the Administrator that the remedial plan has...

  7. Enterprise Resource Planning Implementation in Higher Education

    ERIC Educational Resources Information Center

    Graham, James F.

    2009-01-01

    Enterprise resource planning (ERP) implementation projects are unique to each institution and yet are expensive, time consuming, and result in change across the institution. Five Midwest public and private 4-year higher education institutions were studied to determine the impact of five specific key factors on the overall success of the ERP…

  8. NASA Education Implementation Plan 2015-2017

    ERIC Educational Resources Information Center

    National Aeronautics and Space Administration, 2015

    2015-01-01

    The NASA Education Implementation Plan (NEIP) provides an understanding of the role of NASA in advancing the nation's STEM education and workforce pipeline. The document outlines the roles and responsibilities that NASA Education has in approaching and achieving the agency's and administration's strategic goals in STEM Education. The specific…

  9. How to Plan and Implement a Workshop.

    ERIC Educational Resources Information Center

    Howell, Jacquie

    These guidelines were developed to assist school administrators who have the responsibility of organizing a one- to three-day professional development program. The first section outlines the tasks involved in planning and implementing a workshop. The remaining sections cover the following: (1) developing and utilizing the workshop theme; (2)…

  10. Marketing Internships: A Planning and Implementation Guide.

    ERIC Educational Resources Information Center

    Faught, Suzanne G.

    This planning and implementation guide is designed to assist marketing educators and others supportive of marketing education. It begins with definitions of vocabulary of related terminology and descriptions of the four models of internships presented in the guide: full-year, rotation-type format; 1-semester, rotation-type format; full-year format…

  11. Evaluating the Implementation of School Wellness Plans

    ERIC Educational Resources Information Center

    Tavenner, Patricia Lynn; Tomlinson, Jaret W.

    2011-01-01

    This problem-based learning project addressed the need to improve the implementation of school wellness plans in Missouri. Student health and well-being are at the forefront of educational issues throughout our country. The project performed a discrepancy analysis through three components. The components consisted of developing a knowledge base…

  12. Marketing Internships: A Planning and Implementation Guide.

    ERIC Educational Resources Information Center

    Faught, Suzanne G.

    This planning and implementation guide is designed to assist marketing educators and others supportive of marketing education. It begins with definitions of vocabulary of related terminology and descriptions of the four models of internships presented in the guide: full-year, rotation-type format; 1-semester, rotation-type format; full-year format…

  13. Enterprise Resource Planning Implementation in Higher Education

    ERIC Educational Resources Information Center

    Graham, James F.

    2009-01-01

    Enterprise resource planning (ERP) implementation projects are unique to each institution and yet are expensive, time consuming, and result in change across the institution. Five Midwest public and private 4-year higher education institutions were studied to determine the impact of five specific key factors on the overall success of the ERP…

  14. 24 CFR 598.605 - Implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... economic development standards of this subpart. (b) Proposed funded project or activity. The project or activity proposed in the implementation plan is subject to the following requirements: (1) The Federal... of 1970 (URA) (42 U.S.C. 4601 et seq.); (4) The environmental review and approval requirements of...

  15. 78 FR 60700 - Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-02

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 49 Source Specific Federal Implementation Plan for Implementing Best Available... Federal Implementation Plan (FIP) to implement the Best Available Retrofit Technology (BART) requirement...

  16. 40 CFR 49.10256 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Plan for the Kootenai Tribe of Idaho § 49.10256 Contents of implementation plan. The implementation plan for the Reservation of the Kootenai Tribe of Idaho consists of the following rules, regulations...

  17. 40 CFR 49.10046 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Plan for the Cow Creek Band of Umpqua Indians of Oregon § 49.10046 Contents of implementation plan. The implementation plan for the Reservation of the Cow Creek Band of Umpqua Indians consists of the following rules...

  18. Hanford Environmental Management Program implementation plan

    SciTech Connect

    Not Available

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs.

  19. Implementation of California state school competitive food and beverage standards.

    PubMed

    Samuels, Sarah E; Hutchinson, Krista S; Craypo, Lisa; Barry, Jason; Bullock, Sally L

    2010-12-01

    Competitive foods and beverages are available on most US school campuses. States and school districts are adopting nutrition standards to regulate these products, but few studies have reported on the extent to which schools are able to adhere to competitive regulations. The purpose of this study was to describe the extent to which schools in disadvantaged communities were able to implement California competitive food and beverage standards. Data on the competitive foods (n = 1019) and beverages (n = 572) offered for sale on 19 school campuses were collected in 2005 and 2008. Descriptive statistics were generated on overall adherence rates to school nutrition standards and adherence rates by venue and school level. Logistic regression models tested predictors of adherence by continuous and categorical variables (eg, venue, item selling price). Data show an increase from 2005 to 2008 in average adherence to the California standards. Several predictors had statistically significant associations with adherence or nonadherence. Adherence was higher for competitive foods sold in school stores than foods sold in vending machines. Higher selling price was associated with lower adherence. Competitive foods classified as entrees were more likely to adhere than snack items, and larger total size (in fluid ounces) beverages were associated with higher adherence. Schools have begun to implement competitive food and beverage policies. However, school environments, particularly in secondary schools, are not 100% compliant with school nutrition standards. These findings can inform policymakers and school officials about the feasibility of implementing competitive food standards in schools. © 2010, American School Health Association.

  20. 78 FR 69625 - Approval and Promulgation of Implementation Plans; New York State Ozone Implementation Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-20

    ... From the Federal Register Online via the Government Publishing Office ENVIRONMENTAL PROTECTION... Implementation Plan Revision AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: The Environmental Protection Agency (EPA) is proposing to approve a revision to the New York State...

  1. Applying Climate Science to Urban Water Infrastructure Planning in California

    NASA Astrophysics Data System (ADS)

    Asante, K. O.; Khimsara, P.; Brown, K.

    2013-12-01

    Operators of urban water systems in California routinely develop long-range infrastructure plans to keep the communities they serve informed and to facilitate financing of planned projects. These plans compare baseline water supplies and demands to future projections, and they assess the adequacy of existing infrastructure for delivering water from raw water sources to customer connections under a variety of scenarios. In spite of these planning efforts, urban infrastructure projects are vulnerable to extreme climate and socioeconomic events. This paper examines the challenges facing infrastructure planners seeking to adapt urban water infrastructure to climate change using the current generation of climate predictions. A case study of small urban water systems in Lompoc Valley in California highlights the gap between climate variables available from global climate model predictions and decision parameters used in water infrastructure planning. Solutions are proposed for addressing some of the challenges encountered during climate impact analysis and vulnerability assessment. The paper also highlights outstanding gaps in our understanding of climate change and societal responses which could have profound impacts on urban water use and infrastructure needs.

  2. Interim Land Use Control Implementation Plan

    NASA Technical Reports Server (NTRS)

    Applegate, Joseph L.

    2014-01-01

    This Interim Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Kennedy Space Center (KSC) Contractors Road Heavy Equipment (CRHE) Area (SWMU 055; "the Site") of institutional controls that have been implemented at the Site1. Although there are no current unacceptable risks to human health or the environment associated with the CRHE Area, an interim institutional land use control (LUC) is necessary to prevent human health exposure to volatile organic compound (VOC)-affected groundwater at the Site. Controls will include periodic inspection, condition certification, and agency notification.

  3. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 3 2013-10-01 2013-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  4. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 3 2014-10-01 2014-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  5. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 3 2010-10-01 2010-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  6. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 3 2012-10-01 2012-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  7. 47 CFR 51.213 - Toll dialing parity implementation plans.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 3 2011-10-01 2011-10-01 false Toll dialing parity implementation plans. 51... parity implementation plans. (a) A LEC must file a plan for providing intraLATA toll dialing parity... dialing parity within a state until the implementation plan has been approved by the appropriate...

  8. Tactical Fuel and Energy Implementation Plan

    DTIC Science & Technology

    2010-09-24

    Software Modeling and Validation of a Microgrid ,” delivered to the Alternative Energy NOW Conference, Orlando, FL, 9 February 2010. 34Ibid. 35...This plan is focused on the tactical environment, defined as maneuver brigade combat team (BCT) and below. The study team developed the objectives...what is expected of them, and must know how to implement the new behaviors, once they have been defined . Education is essential in establishing

  9. 40 CFR 51.1002 - Submittal of State implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Provisions for Implementation of PM2.5 National Ambient Air Quality Standards § 51.1002 Submittal of State implementation plan... 40 Protection of Environment 2 2010-07-01 2010-07-01 false Submittal of State implementation plan...

  10. Factors Affecting Implementation of the California Childhood Obesity Research Demonstration (CA-CORD) Project, 2013

    PubMed Central

    Brunner, Julian; Moody, Jamie; Ibarra, Leticia; Hoyt, Helina; McKenzie, Thomas L.; Binggeli-Vallarta, Amy; Cervantes, Griselda; Finlayson, Tracy L.; Ayala, Guadalupe X.

    2016-01-01

    Introduction Ecological approaches to health behavior change require effective engagement from and coordination of activities among diverse community stakeholders. We identified facilitators of and barriers to implementation experienced by project leaders and key stakeholders involved in the Imperial County, California, Childhood Obesity Research Demonstration project, a multilevel, multisector intervention to prevent and control childhood obesity. Methods A total of 74 semistructured interviews were conducted with project leaders (n = 6) and key stakeholders (n = 68) representing multiple levels of influence in the health care, early care and education, and school sectors. Interviews, informed by the Multilevel Implementation Framework, were conducted in 2013, approximately 12 months after year-one project implementation, and were transcribed, coded, and summarized. Results Respondents emphasized the importance of engaging parents and of ensuring support from senior leaders of participating organizations. In schools, obtaining teacher buy-in was described as particularly important, given lower perceived compatibility of the intervention with organizational priorities. From a program planning perspective, key facilitators of implementation in all 3 sectors included taking a participatory approach to the development of program materials, gradually introducing intervention activities, and minimizing staff burden. Barriers to implementation were staff turnover, limited local control over food provided by external vendors or school district policies, and limited availability of supportive resources within the broader community. Conclusion Project leaders and stakeholders in all sectors reported similar facilitators of and barriers to implementation, suggesting the possibility for synergy in intervention planning efforts. PMID:27763831

  11. 327 Building fire hazards analysis implementation plan

    SciTech Connect

    BARILO, N.F.

    1999-05-10

    In March 1998, the 327 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the U.S. Department of Energy, Richland Operations Office (DOE-E) for implementation by B and W Hanford Company (BWC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in five areas and provided nine recommendations (11 items) to bring the 327 Building into compliance. A status is provided for each recommendation in this document. BWHC will use this Implementation Plan to bring the 327 Building and its operation into compliance with DOE Order 5480.7A and IUD 5480.7.

  12. Implementation in Practice: Adaptations to Sexuality Education Curricula in California.

    PubMed

    Arons, Abigail; Decker, Mara; Yarger, Jennifer; Malvin, Jan; Brindis, Claire D

    2016-09-01

    Local implementation of evidence-based curricula, including sex education, has received increasing attention. Although there are expectations that practitioners will implement evidence-based programs with fidelity, little is known regarding the experiences of instructors in meeting such standards. During 2005 to 2009, the California Department of Public Health funded local agencies through its Teen Pregnancy Prevention Programs (TPP) to provide comprehensive sex education. To improve understanding of how agencies implemented curricula, in-depth telephone interviews with 128 coordinators were conducted in 2008 to 2009. Qualitative data were analyzed for content and themes. Selected data were quantified and analyzed to examine differences in curriculum adaptations across settings and curricula type. Whereas over half of the TPP agencies (59%) implemented evidence-based curricula, most agencies (95%) reported adapting the curriculum, with the majority (83%) adding content. Reasons for adaptations included ensuring that the material was accurate and appropriate; responding to logistical or time constraints; and other factors, such as parental and institutional support. These adaptations reflected agencies' efforts to balance state and local requirements, maintain curriculum fidelity, and provide more up-to-date and accessible information. These experiences highlight the need for guidelines that enable appropriate adaptations, while maintaining fidelity to the core components of the original curriculum. © 2016, American School Health Association.

  13. Gen IV Materials Handbook Implementation Plan

    SciTech Connect

    Rittenhouse, P.; Ren, W.

    2005-03-29

    A Gen IV Materials Handbook is being developed to provide an authoritative single source of highly qualified structural materials information and materials properties data for use in design and analyses of all Generation IV Reactor Systems. The Handbook will be responsive to the needs expressed by all of the principal government, national laboratory, and private company stakeholders of Gen IV Reactor Systems. The Gen IV Materials Handbook Implementation Plan provided here addresses the purpose, rationale, attributes, and benefits of the Handbook and will detail its content, format, quality assurance, applicability, and access. Structural materials, both metallic and ceramic, for all Gen IV reactor types currently supported by the Department of Energy (DOE) will be included in the Gen IV Materials Handbook. However, initial emphasis will be on materials for the Very High Temperature Reactor (VHTR). Descriptive information (e.g., chemical composition and applicable technical specifications and codes) will be provided for each material along with an extensive presentation of mechanical and physical property data including consideration of temperature, irradiation, environment, etc. effects on properties. Access to the Gen IV Materials Handbook will be internet-based with appropriate levels of control. Information and data in the Handbook will be configured to allow search by material classes, specific materials, specific information or property class, specific property, data parameters, and individual data points identified with materials parameters, test conditions, and data source. Details on all of these as well as proposed applicability and consideration of data quality classes are provided in the Implementation Plan. Website development for the Handbook is divided into six phases including (1) detailed product analysis and specification, (2) simulation and design, (3) implementation and testing, (4) product release, (5) project/product evaluation, and (6) product

  14. Financing the Plan: California's Master Plan for Higher Education 1960 to 1994, Report 95-1.

    ERIC Educational Resources Information Center

    Pickens, William

    This report identifies and discusses some key findings of a data base project that analyzed public finance of public education over 35 years in California. It seeks to understand the relationship between state policy, as expressed in the Master Plan for Higher Education, and financial support of higher education. Among findings highlighted are the…

  15. Chronic care model implementation in the California State Prison System.

    PubMed

    Ha, Betsy Chang; Robinson, Greg

    2011-04-01

    The chronic care model (CCM) deployed through a learning collaborative strategy, such as the Institute for Healthcare Improvement's Breakthrough Series (BTS), is a widely adopted approach to improve care that has guided clinical quality initiatives nationally and internationally. The BTS collaborative approach has been used to improve chronic conditions at national and state levels and in single health care delivery systems but not in correctional health care. Combining the CCM with a learning collaborative strategy in prison health care is a new frontier. This article describes the adoption of the CCM using a learning collaborative approach in the California prison system under the mandate of a federal receivership and elucidates some barriers to implementation. Results from the first phase of a pilot study were positive in terms of benefit/ cost analysis and suggest financial and political viability to continue the program.

  16. F-16 Implementation and Management. Plan Report.

    DTIC Science & Technology

    1981-03-01

    JXPK1R - .EELOPMENT RER6-.Jio. 18 ,v MARCH, -1" Prepared in fulfillment of CDRL nos. B028, B029, B030, B033, B050, B057, B059 II LECTEI by S JUNO 8...implementation and management plan report (F-16 Development Report No. 18 ). San Diego, Calif.: Courseware, Inc., October 1978, March 1981. Sudweeks...Instruction .............. 17 v . E . CONTENTS (Cont.) Page 3.4 Student Training and Measurement ......... 18 3.4.1 Academic events .............. 18 3.4.2

  17. Implementing Manufacturing Resources Planning for Marine Corps

    DTIC Science & Technology

    1989-06-01

    business planning , production planning, master production planning, capacity requirements planning, and the execution support systems for capacity and...during the following discussion. [Refs. 7 and 131 General business planning sets the overall objectives for the manufacturing concern. The overall...materials plan then generates a set of purchasing and manufacturing requirements that are necessary 57 BUSINESS PLANNING OBJECTIVES MARKETING PLANNING

  18. Implementation Issues for Departure Planning Systems

    NASA Technical Reports Server (NTRS)

    Hansman, R. John; Feron, Eric; Clarke, John-Paul; Odoni, Amedeo

    1999-01-01

    The objective of the proposed effort is to investigate issues associated with the design and implementation of decision aiding tools to assist in improving the departure process at congested airports. This effort follows a preliminary investigation of potential Departure Planning approaches and strategies, which identified potential benefits in departure efficiency, and also in reducing the environmental impact of aircraft in the departure queue. The preliminary study bas based, in large part, on observations and analysis of departure processes at Boston, Logan airport. The objective of this follow-on effort is to address key implementation issues and to expand the observational base to include airports with different constraints and traffic demand. Specifically, the objectives of this research are to: (1) Expand the observational base to include airports with different underlying operational dynamics. (2) Develop prototype decision aiding algorithms/approaches and assess potential benefits. and (3) Investigate Human Machine Integration (HMI) issues associated with decision aids in tower environments.

  19. Environmental Restoration Quality Program Implementation Plan

    SciTech Connect

    Not Available

    1992-08-01

    The Environmental Restoration (ER) Program requirements for implementation of DOE Order 5700.6C are identified in the Environmental Restoration Quality Program Plan, (QPP). Management systems necessary to implement the ER QPP consist of the necessary standards and procedures required to be developed to adequately control ER processes. To the extent possible, Martin Marietta Energy Systems, Inc., standards and procedures will be utilized at the ER Program level, and requirements will not be repeated. The quality management systems identified for enhancement or development are identified in the section on Procedure Development Strategy and directly relate to unique ER Program activities. Procedures and standards that currently exist in the ER Program will be validated for compliance with ER QPP requirements.

  20. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 9 2011-10-01 2011-10-01 false Aircraft Operator Implementation Plan. 1560.109... Collection and Transmission of Secure Flight Passenger Data for Watch List Matching § 1560.109 Aircraft Operator Implementation Plan. (a) Content of the Aircraft Operator Implementation Plan (AOIP). Each...

  1. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 9 2012-10-01 2012-10-01 false Aircraft Operator Implementation Plan. 1560.109... Collection and Transmission of Secure Flight Passenger Data for Watch List Matching § 1560.109 Aircraft Operator Implementation Plan. (a) Content of the Aircraft Operator Implementation Plan (AOIP). Each...

  2. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 9 2014-10-01 2014-10-01 false Aircraft Operator Implementation Plan. 1560.109... Collection and Transmission of Secure Flight Passenger Data for Watch List Matching § 1560.109 Aircraft Operator Implementation Plan. (a) Content of the Aircraft Operator Implementation Plan (AOIP). Each...

  3. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 9 2013-10-01 2013-10-01 false Aircraft Operator Implementation Plan. 1560.109... Collection and Transmission of Secure Flight Passenger Data for Watch List Matching § 1560.109 Aircraft Operator Implementation Plan. (a) Content of the Aircraft Operator Implementation Plan (AOIP). Each...

  4. 40 CFR 49.9866 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9866 Contents of implementation plan. The implementation plan for the Reservation of the Burns Paiute Indian Colony consists of...) Section 49.131General rule for open burning. (h) Section 49.135Rule for emissions detrimental to...

  5. 40 CFR 49.9866 - Contents of implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9866 Contents of implementation plan. The implementation plan for the Reservation of the Burns Paiute Indian Colony consists of...) Section 49.131General rule for open burning. (h) Section 49.135Rule for emissions detrimental to...

  6. 40 CFR 49.9866 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9866 Contents of implementation plan. The implementation plan for the Reservation of the Burns Paiute Indian Colony consists of...) Section 49.131General rule for open burning. (h) Section 49.135Rule for emissions detrimental to public...

  7. 40 CFR 49.9866 - Contents of implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Implementation Plan for the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9866 Contents of implementation plan. The implementation plan for the Reservation of the Burns Paiute Indian Colony consists of...) Section 49.131General rule for open burning. (h) Section 49.135Rule for emissions detrimental to public...

  8. 49 CFR 1560.109 - Aircraft Operator Implementation Plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Aircraft Operator Implementation Plan. 1560.109... Collection and Transmission of Secure Flight Passenger Data for Watch List Matching § 1560.109 Aircraft Operator Implementation Plan. (a) Content of the Aircraft Operator Implementation Plan (AOIP). Each covered...

  9. 76 FR 11193 - Sequoia National Forest; California; Piute Mountains Travel Management Plan; Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-01

    ...; ] DEPARTMENT OF AGRICULTURE Forest Service Sequoia National Forest; California; Piute Mountains Travel... for the Piute Mountains Travel Management Plan. FOR FURTHER INFORMATION CONTACT: Warren L. Niemi, 559...

  10. WHC natural phenomena hazards mitigation implementation plan

    SciTech Connect

    Conrads, T.J.

    1996-09-11

    Natural phenomena hazards (NPH) are unexpected acts of nature which pose a threat or danger to workers, the public or to the environment. Earthquakes, extreme winds (hurricane and tornado),snow, flooding, volcanic ashfall, and lightning strike are examples of NPH at Hanford. It is the policy of U.S. Department of Energy (DOE) to design, construct and operate DOE facilitiesso that workers, the public and the environment are protected from NPH and other hazards. During 1993 DOE, Richland Operations Office (RL) transmitted DOE Order 5480.28, ``Natural Phenomena Hazards Mitigation,`` to Westinghouse Hanford COmpany (WHC) for compliance. The Order includes rigorous new NPH criteria for the design of new DOE facilities as well as for the evaluation and upgrade of existing DOE facilities. In 1995 DOE issued Order 420.1, ``Facility Safety`` which contains the same NPH requirements and invokes the same applicable standards as Order 5480.28. It will supersede Order 5480.28 when an in-force date for Order 420.1 is established through contract revision. Activities will be planned and accomplished in four phases: Mobilization; Prioritization; Evaluation; and Upgrade. The basis for the graded approach is the designation of facilities/structures into one of five performance categories based upon safety function, mission and cost. This Implementation Plan develops the program for the Prioritization Phase, as well as an overall strategy for the implemention of DOE Order 5480.2B.

  11. Implementing LCFF: Communicating about District Plans. Policy and Practice Brief

    ERIC Educational Resources Information Center

    Knudson, Joel

    2016-01-01

    California educators continue in their struggle to communicate district plans to parents, teachers, and other members of the school community. Local Control Accountability Plans (LCAPs), have ballooned into jargon-laden stacks of tables, impenetrable to all but the most sophisticated reader. Envisioned as a tool to improve transparency, the LCAP…

  12. Science operations planning and implementation for Rosetta

    NASA Astrophysics Data System (ADS)

    Koschny, Detlef; Sweeney, Mark; Montagon, Elsa; Hoofs, Raymond; van der Plas, Peter

    2002-07-01

    The Rosetta mission is a cornerstone mission of the Horizon 2000 programme of the European Space Agency. It will be launched to comet 46P/Wirtanen in January 2003. This mission is the first of a series of planetary missions, including Mars Express, Smart-I (to the Moon), and BepiColombo (to Mercury). All these missions have similar requirements for their scientific operations. The Experiments H/W and S/W are developed by Principal Investigators, working at scientific institutes. They are also responsible for the operation of their experiments and for the generation of related operational documentation. The Science Operations Centre (SOC) has the task to consolidate the inputs of the different experimenters and the Lander and ensure that the resulting science operations timeline is free of conflicts. It forwards this timeline to the Mission Operations Centre (MOC) which combines the science operations with the operations of the other spacecraft subsystems and the orbit and attitude of the spacecraft. The MOC is also responsible for uplinking the operational command sequences to the spacecraft and for returning the received telemetry to the user. In a collaboration between the team of the Rosetta Project Scientist at the Research and Science Support Department of ESA/ESTEC and the European Space Operations Centre (ESA/ESOC), a concept for the SOC/MOC and their interfaces was developed for the Rosetta mission. This concept is generic enough to allow its implementation also for the other planetary missions. The design phase is now complete, and implementation is on-going. This paper briefly presents the architecture of the complex ground segment, concentrating on the elements required for planning of scientific operations, and then details the software tools EPS (Experiment Planning System) and PTB (Project Test Bed) which are used in the planning process.

  13. Access and Equity: California Master Plan for Higher Education and Disadvantaged Student Success

    ERIC Educational Resources Information Center

    Davis, Kevin P.

    2015-01-01

    The California Master Plan for Higher Education sets a policy objective of equity through access to higher education. The California State University system is California's primary institution for providing the social mobility that accompanies a four-year college degree. The purpose of this study is to examine the education lifecycle outcomes for…

  14. 78 FR 66058 - Habitat Conservation Plan for South Sacramento County, California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-04

    ... Fish and Wildlife Service ; Habitat Conservation Plan for South Sacramento County, California AGENCY... Policy Act and the California Environmental Quality Act for the proposed South Sacramento Habitat... Environmental Policy Act and the California Environmental Quality Act for the proposed South Sacramento Habitat...

  15. California Cultures: Implementing a Model for Virtual Collections

    ERIC Educational Resources Information Center

    Guerard, Genie; Chandler, Robin L.

    2006-01-01

    This article highlights the California Cultures Project as a case study examining the architecture and framework required to support the deployment of digital objects as virtual collections at the California Digital Library. Chronologically arranged, it describes the Online Archive of California (OAC) Working Group's functional requirements for…

  16. 75 FR 29897 - Approval and Promulgation of Implementation Plans; New York State Implementation Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-28

    .... What is the history and time frame for State Implementation Plan (SIP) submissions? II. What was... is EPA's conclusion? V. Statutory and Executive Order Reviews I. What is the history and time frame... NYCRR Parts 235 and 239. The reader is referred to that proposal for a more detailed discussion of this...

  17. University of California, Irvine, Student Affirmative Action Five-Year Plan and Planning Process, 1984-1988. Volume I.

    ERIC Educational Resources Information Center

    Galligani, Dennis J.

    This first volume of the University of California, Irvine, (UCI) Student Affirmative Action (SAA) Five-Year Plan provides an overview of the plan and the planning process, lists campus SAA goals and objectives, summarizes campus SAA activities, and describes the research and evaluation components of the plan. Topics include: the historical context…

  18. Administrator's Guide to Technology: Planning, Funding & Implementation.

    ERIC Educational Resources Information Center

    Aspen Education Development Group, Gaithersburg, MD.

    This document provides guidelines for administrators related to instructional technology and planning. Chapter 1 discusses planning, including developing a technology plan, facility assessment, e-rate planning, formation of a technology committee, budget planning, and hardware/software replacement plan and costs. Chapter 2 addresses…

  19. 78 FR 59261 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-26

    ... redesignate the Sacramento nonattainment area to attainment for the 24- hour particulate matter of ten microns... proposing to approve California's ten-year ozone maintenance plan for the area, the MVEBs, and the...

  20. Hanford Tanks Initiative quality assurance implementation plan

    SciTech Connect

    Huston, J.J.

    1998-06-23

    Hanford Tanks Initiative (HTI) Quality Assurance Implementation Plan for Nuclear Facilities defines the controls for the products and activities developed by HTI. Project Hanford Management Contract (PHMC) Quality Assurance Program Description (QAPD)(HNF-PRO599) is the document that defines the quality requirements for Nuclear Facilities. The QAPD provides direction for compliance to 10 CFR 830.120 Nuclear Safety Management, Quality Assurance Requirements. Hanford Tanks Initiative (HTI) is a five-year activity resulting from the technical and financial partnership of the US Department of Energy`s Office of Waste Management (EM-30), and Office of Science and Technology Development (EM-50). HTI will develop and demonstrate technologies and processes for characterization and retrieval of single shell tank waste. Activities and products associated with HTI consist of engineering, construction, procurement, closure, retrieval, characterization, and safety and licensing.

  1. Solid Waste Assurance Program Implementation Plan

    SciTech Connect

    Irons, L.G.

    1995-06-19

    On June 6, 1995, a waiver to Hanford Site Solid Waste Acceptance Criteria, was approved by the US Department of Energy Richland Operations Office (RL) to replace the low-level, mixed, and transuranic (TRU) generator assessment programs with the Solid Waste Assurance Program (SWAP). This is associated with a waiver that was approved on March 16, 1995 to replace the Storage/Disposal Approval Record (SDAR) requirements with the Waste Specification System (WSS). This implementation plan and the SWAP applies to Solid Waste Disposal (SWD) functions, facilities, and personnel who perform waste acceptance, verification, receipt, and management functions of dangerous, radioactive, and mixed waste from on- and off-site generators who ship to or within the Hanford Site for treatment, storage, and/or disposal (TSD) at SWD TSD facilities.

  2. Environment, safety, and health regulatory implementation plan

    SciTech Connect

    Not Available

    1993-10-21

    To identify, document, and maintain the Uranium Mill Tailings Remedial Action (UMTRA) Project`s environment, safety, and health (ES&H) regulatory requirements, the US Department of Energy (DOE) UMTRA Project Office tasked the Technical Assistance Contractor (TAC) to develop a regulatory operating envelope for the UMTRA Project. The system selected for managing the UMTRA regulatory operating envelope data bass is based on the Integrated Project Control/Regulatory Compliance System (IPC/RCS) developed by WASTREN, Inc. (WASTREN, 1993). The IPC/RCS is a tool used for identifying regulatory and institutional requirements and indexing them to hardware, personnel, and program systems on a project. The IPC/RCS will be customized for the UMTRA Project surface remedial action and groundwater restoration programs. The purpose of this plan is to establish the process for implementing and maintaining the UMTRA Project`s regulatory operating envelope, which involves identifying all applicable regulatory and institutional requirements and determining compliance status. The plan describes how the Project will identify ES&H regulatory requirements, analyze applicability to the UMTRA Project, and evaluate UMTRA Project compliance status.

  3. A Report on Health Sciences Education Planning for California: 1980-1982.

    ERIC Educational Resources Information Center

    California State Postsecondary Education Commission, Sacramento.

    Health sciences education planning for California for 1980-82 is examined. The adequacy of educational programs in meeting the needs of California for professional personnel in medicine, nursing, dentistry, pharmacy, and optometry is assessed. Data on enrollments and graduation rates in these fields are updated from the 1978 plan, and similar data…

  4. 75 FR 6696 - Draft Recovery Plan for Tidal Marsh Ecosystems of Northern and Central California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-10

    ... Fish and Wildlife Service Draft Recovery Plan for Tidal Marsh Ecosystems of Northern and Central... draft recovery plan for Tidal Marsh Ecosystems of Northern and Central California for public review and... Marsh Ecosystems of Northern and Central California features five endangered species. The biology of...

  5. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  6. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  7. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  8. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  9. 49 CFR 130.33 - Response plan implementation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION OIL TRANSPORTATION OIL SPILL PREVENTION AND RESPONSE PLANS § 130.33 Response plan implementation. If, during transportation of oil subject to this part, a... management authority of, the United States—the person transporting the oil shall implement the plan...

  10. Getting Started: Planning and Implementing Computer Instruction in Schools.

    ERIC Educational Resources Information Center

    Mojkowski, Charles

    Intended for use by local school district staff, this manual provides step-by-step guidelines for planning and implementing the incorporation of computer-based instruction in the curriculum. Procedures involved in five phases of planning and implementation are outlined, covering: (1) preliminary planning, where schools should establish planning…

  11. 40 CFR 49.9926 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes-Region X Implementation Plan for the Coeur D'alene Tribe of the Coeur D'alene Reservation, Idaho § 49.9926 Contents...

  12. Implementation of Discharge Plans for Chronically Ill Elders Discharged Home.

    ERIC Educational Resources Information Center

    Proctor, Enola K.; And Others

    1996-01-01

    Addresses the extent to which discharge plans for elderly patients with congestive heart failure were implemented as planned, tested the consequences of implementation problems, and identified factors associated with implementation problems. Implications for hospital discharge planners and home health care are discussed. (KW)

  13. Implementation planning for industrial energy conservation: approach and methodology

    SciTech Connect

    Alston, T.G.; Falk, G.; Grogan, P.J.; Katz, D.; Tatar, J.

    1981-01-01

    Details of an industry-specific Conservation Technology Implementation Branch implementation plan is described in detail. CTIB has conducted implementation planning in the steel, pulp/paper, and agriculture/food processing industries, but in FY 1981, CTIB plans to conduct planning for the chemicals, petroleum refining, aluminum, glass, cement, and textile industries. Guidelines are presented for each contractor for each industry toward a common methodology in terms of approach, areas of analysis, assumptions, and reporting. The major parts of the CTIB plan are: an implementation study consisting of technology selection, market demand analysis, and policy analysis, and a plan consisting of a detailed description and schedule of future CTIB actions, followed by a recommended system for monitoring market results when the plan is implemented. (MCW)

  14. Easing the Transition: How to Implement an Automated Succession Plan.

    ERIC Educational Resources Information Center

    Andrews, Jean P.

    1989-01-01

    An automated succession plan can create smooth transitions when employees transfer or leave the company. It can also boost productivity and employee morale. (Includes a basic nine-step implementation plan that makes the process easy and relatively painless.) (JOW)

  15. Dismantling Bilingual Education Implementing English Immersion: The California Initiative.

    ERIC Educational Resources Information Center

    Rossell, Christine H.

    This study explored bilingual education in California, analyzing California law on instruction for English Learners before and after Proposition 227. Proposition 227 required that all English Learners (EL) participate in a sheltered English immersion program in which most instruction was in English with curriculum and presentation designed for…

  16. Implementing the Common Core State Standards in California

    ERIC Educational Resources Information Center

    Warren, Paul; Murphy, Patrick

    2014-01-01

    The Common Core State Standards (CCSS)--adopted in 2010--are similar to California's current K-12 standards, but their emphasis on conceptual understanding and problem solving will require changes in classroom instruction. California's transition to the CCSS has gotten off to a slow start. Survey data suggest that many teachers will deliver the…

  17. Implementing the Common Core State Standards in California

    ERIC Educational Resources Information Center

    Warren, Paul; Murphy, Patrick

    2014-01-01

    The Common Core State Standards (CCSS)--adopted in 2010--are similar to California's current K-12 standards, but their emphasis on conceptual understanding and problem solving will require changes in classroom instruction. California's transition to the CCSS has gotten off to a slow start. Survey data suggest that many teachers will deliver the…

  18. Expanded State-Funded Family Planning Services: Estimating Pregnancies Averted by the Family PACT Program in California, 1997–1998

    PubMed Central

    Foster, Diana Greene; Klaisle, Cynthia M.; Blum, Maya; Bradsberry, Mary E.; Brindis, Claire D.; Stewart, Felicia H.

    2004-01-01

    Objectives. The California Family Planning, Access, Care, and Treatment Program was implemented in 1997 to provide family planning services for uninsured, low-income women and men. We estimated the impact on fertility of providing 500 000 women with contraceptives. Methods. Paid claims and medical record review data were used to estimate pregnancies averted. Pregnancies women experienced while enrolled in the program and pregnancies they would have experienced given methods used before enrollment were modeled as a Markov process. Results. One year of Family Planning, Access, Care, and Treatment services averted an estimated 108 000 unintended pregnancies that would have resulted in 50 000 unintended births and 41 000 induced abortions. Conclusions. Providing contraceptives to low income, medically indigent women significantly reduced the number of unintended pregnancies in California. PMID:15284041

  19. A Study of California Public School District Superintendents and Their Implementation of 21st Century Skills

    ERIC Educational Resources Information Center

    Gittisriboongul, Patrick

    2013-01-01

    The purpose of this study was to identify the strategies, practices, and leadership skills utilized by California superintendents in implementing 21st-century skills in their respective districts. A mixed-methods design was used, combining qualitative and quantitative analysis. Quantitative data from 37 California superintendents were collected…

  20. A Study of California Public School District Superintendents and Their Implementation of 21st Century Skills

    ERIC Educational Resources Information Center

    Gittisriboongul, Patrick

    2013-01-01

    The purpose of this study was to identify the strategies, practices, and leadership skills utilized by California superintendents in implementing 21st-century skills in their respective districts. A mixed-methods design was used, combining qualitative and quantitative analysis. Quantitative data from 37 California superintendents were collected…

  1. Implementing the "Information Competency" Graduation Requirement in California Community Colleges: A Chronology of Sources, and Lists.

    ERIC Educational Resources Information Center

    Brose, Friedrich

    This document offers a chronology of sources regarding the implementation of an information competency graduation requirement in California community colleges. The Academic Senate for the California Community Colleges defines information competency as the ability to find, evaluate, use, and communicate information in various formats. The…

  2. California hospital networks are narrower in Marketplace than in commercial plans, but access and quality are similar.

    PubMed

    Haeder, Simon F; Weimer, David L; Mukamel, Dana B

    2015-05-01

    Do insurance plans offered through the Marketplace implemented by the State of California under the Affordable Care Act restrict consumers' access to hospitals relative to plans offered on the commercial market? And are the hospitals included in Marketplace networks of lower quality compared to those included in the commercial plans? To answer these questions, we analyzed differences in hospital networks across similar plan types offered both in the Marketplace and commercially, by region and insurer. We found that the common belief that Marketplace plans have narrower networks than their commercial counterparts appears empirically valid. However, there does not appear to be a substantive difference in geographic access as measured by the percentage of people residing in at least one hospital market area. More surprisingly, depending on the measure of hospital quality employed, the Marketplace plans have networks with comparable or even higher average quality than the networks of their commercial counterparts.

  3. Project Management Plan (PMP) for Work Management Implementation

    SciTech Connect

    SHIPLER, C.E.

    2000-01-13

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  4. Implementing Aid in Dying in California: Experiences from Other States Indicates the Need for Strong Implementation Guidance.

    PubMed

    Cain, Cindy L

    2016-05-01

    In late 2015, California passed the End of Life Option Act (AB 15), which allows residents at the terminal stage of an illness to request a prescription for medications meant to hasten death. As California seeks to implement the law in June 2016, findings from other states that practice aid in dying (AID) may guide implementation. This policy brief provides an overview of the use of AID, outlines outstanding questions about practice and ethics, and recommends steps for improving California's implementation of AB 15. Specifically, the implementation of AB 15 would be improved by adjusting surveillance data-collection requirements and encouraging additional research investment, using the legalization of AID to improve knowledge of and practices for end-of-life care generally, and creating ongoing educational opportunities for providers and the general public.

  5. The role of community context in planning and implementing community-based health promotion projects.

    PubMed

    Kegler, Michelle C; Rigler, Jessica; Honeycutt, Sally

    2011-08-01

    The current study examines how community context affected collaborative planning and implementation in eight sites participating in a healthy cities and communities initiative in California. Data are from 23 focus groups conducted with coalition members, and 76 semi-structured interviews with local coordinators and community leaders. Multiple case study methods were used to identify major themes related to how five contextual domains influenced collaborative planning and implementation. Results showed that history of collaboration can influence resources and interpersonal and organizational connections available for planning and implementation, as well as priorities selected for action. Community politics and history can affect which segments of the community participate in a planning process and what issues are prioritized, as well as the pool of partners willing to aid in implementation. Some community norms and values bring people together and others appear to limit involvement from certain groups. Community demographics and economic conditions may shape outreach strategies for planning and implementation, and may also shape priorities. Geography can play a role in assessment methods, priority selection, partners available to aid in implementation, and participation in activities and events. Results suggest that community context plays a substantive role in shaping how community-based health promotion projects unfold.

  6. Implementation planning for industrial energy conversation: Approach and methodology

    NASA Astrophysics Data System (ADS)

    Alston, T. G.; Falk, G.; Grogan, P. J.; Katz, D.; Tatar, J.

    1981-01-01

    Details of an industry-specific Conservation Technology Implementation Branch implemenation plan is described in detail. CTIB has conducted implementation planning in the steel, pulp/ paper, and agriculture/food processing industries, but in FY 1981, CTIB plans to conduct planning for the chemicals, petroleum refining, aluminum, glass, cement, and textile industries. Guidelines are presented for each contractor for each industry toward a common methodology in terms of approach, areas of analysis, assumptions, and reporting. The major parts of the CTIB plan are: an implementation study consisting of technology selection, market demand analysis, and policy analysis, and a plan consisting of a detailed description and schedule of future CTIB actions, followed by a recommended system for monitoring market results when the plan is implemented.

  7. The Roles of Elementary School Administrators and the Obstacles They Encounter in the Process of Implementing and Maintaining Dual Immersion Programs in California

    ERIC Educational Resources Information Center

    Ramirez, Anel-Janeth

    2010-01-01

    The growing English learner student population in California faces the daunting challenge of both meeting the academic expectations of school curriculum while also learning to speak, write, read, and understand a new language. Often it is the task of school administrators to choose, plan, implement, and maintain instructional programs that best…

  8. Implementation Plan for 1998-1999. Dalton State College Strategic Plan, 1997-2000.

    ERIC Educational Resources Information Center

    Dalton College, GA. Office of Institutional Research and Planning.

    This document presents the second-year implementation plans for 1998-1999 of Dalton State College's Strategic Plan for 1997-2000. It contains the following planning priorities and action plans for the roles of the: President; Office of Institutional Research and Planning; Office of Public Relations; Dean of Academic Affairs; Division of Business…

  9. 75 FR 69373 - Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-12

    ... AGENCY 40 CFR Part 49 Source Specific Federal Implementation Plan for Implementing Best Available...) ] signed a proposal to promulgate a source specific Federal Implementation Plan (FIP) requiring the Four... Federal Register on October 19, 2010 (75 FR 64221). Given the significant public interest in this source...

  10. 76 FR 508 - Approval and Promulgation of Implementation Plans; Idaho

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-05

    ... AGENCY 40 CFR Part 52 Approval and Promulgation of Implementation Plans; Idaho AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve revisions to the Idaho State Implementation Plan (SIP) that were submitted to EPA by the State of Idaho on April 16, 2007. This...

  11. 40 CFR 93.151 - State implementation plan (SIP) revision.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 21 2012-07-01 2012-07-01 false State implementation plan (SIP... implementation plan (SIP) revision. The provisions and requirements of this subpart to demonstrate conformity... nonattainment and maintenance areas where EPA has not approved the General Conformity SIP revision allowed...

  12. 40 CFR 93.151 - State implementation plan (SIP) revision.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 21 2013-07-01 2013-07-01 false State implementation plan (SIP... implementation plan (SIP) revision. The provisions and requirements of this subpart to demonstrate conformity... nonattainment and maintenance areas where EPA has not approved the General Conformity SIP revision allowed...

  13. 40 CFR 93.151 - State implementation plan (SIP) revision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false State implementation plan (SIP... implementation plan (SIP) revision. The Federal conformity rules under this subpart, in addition to any existing... requirements until such time as the required conformity SIP revision is approved by EPA. A State's...

  14. 40 CFR 93.151 - State implementation plan (SIP) revision.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 20 2011-07-01 2011-07-01 false State implementation plan (SIP... implementation plan (SIP) revision. The provisions and requirements of this subpart to demonstrate conformity... nonattainment and maintenance areas where EPA has not approved the General Conformity SIP revision allowed...

  15. 40 CFR 93.151 - State implementation plan (SIP) revision.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 20 2014-07-01 2013-07-01 true State implementation plan (SIP... implementation plan (SIP) revision. The provisions and requirements of this subpart to demonstrate conformity... nonattainment and maintenance areas where EPA has not approved the General Conformity SIP revision allowed...

  16. Planning and Management. Career Education Dissemination Project. Implementation Booklet #7.

    ERIC Educational Resources Information Center

    Benson, Arland; Henriksen, Dorothy, Ed.

    Materials contained in this career education implementation booklet (one in a series of seven) are designed to provide experiences for developing the skills necessary to plan and manage a comprehensive career education program. This booklet focuses on the processes of planning and implementing and is closely related to Booklet #1, Consultation and…

  17. 40 CFR 49.9866 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the Burns Paiute Tribe of the Burns Paiute Indian Colony of Oregon § 49.9866 Contents of implementation plan. The implementation plan for the Reservation of the Burns Paiute Indian Colony consists of...) Section 49.131General rule for open burning. (h) Section 49.135Rule for emissions detrimental to public...

  18. 40 CFR 49.9896 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  19. 40 CFR 49.9986 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... for emissions detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan...

  20. 40 CFR 49.9926 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan for the Coeur D'alene Tribe of the Coeur D'alene Reservation, Idaho § 49.9926 Contents of...

  1. 40 CFR 49.9956 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... detrimental to public health or welfare. (k) Section 49.137Rule for air pollution episodes. (l) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (m) Section 49... ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation Plan...

  2. 40 CFR 49.10526 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Contents of implementation plan. The implementation plan for the lands in trust that are within the... detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49...

  3. 40 CFR 49.10526 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... implementation plan. The implementation plan for the lands in trust that are within the Puyallup Reservation... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V...

  4. 40 CFR 49.10526 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Contents of implementation plan. The implementation plan for the lands in trust that are within the... detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49...

  5. Westinghouse Hanford Company Pollution Prevention Program Implementation Plan

    SciTech Connect

    Floyd, B.C.

    1994-10-01

    This plan documents Westinghouse Hanford Company`s (WHC) Pollution Prevention (P2) (formerly Waste Minimization) program. The program includes WHC; BCS Richland, Inc. (BCSR); and ICF Kaiser Hanford Company (ICF KH). The plan specifies P2 program activities and schedules for implementing the Hanford Site Waste Minimization and Pollution Prevention Awareness (WMin/P2) Program Plan requirements (DOE 1994a). It is intended to satisfy the U.S. Department of Energy (DOE) and other legal requirements that are discussed in both the Hanford Site WMin/P2 plan and paragraph C of this plan. As such, the Pollution Prevention Awareness Program required by DOE Order 5400.1 (DOE 1988) is included in the WHC P2 program. WHC, BCSR, and ICF KH are committed to implementing an effective P2 program as identified in the Hanford Site WMin/P2 Plan. This plan provides specific information on how the WHC P2 program will develop and implement the goals, activities, and budget needed to accomplish this. The emphasis has been to provide detailed planning of the WHC P2 program activities over the next 3 years. The plan will guide the development and implementation of the program. The plan also provides background information on past program activities. Because the plan contains greater detail than in the past, activity scope and implementation schedules may change as new priorities are identified and new approaches are developed and realized. Some activities will be accelerated, others may be delayed; however, all of the general program elements identified in this plan and contractor requirements identified in the Site WMin/P2 plan will be developed and implemented during the next 3 years. This plan applies to all WHC, BCSR, and ICF KH organizations and subcontractors. It will be distributed to those with defined responsibilities in this plan; and the policy, goals, objectives, and strategy of the program will be communicated to all WHC, BCSR, and ICF KH employees.

  6. Total Quality Management Office for Contracting Integrity Implementation Plan

    DTIC Science & Technology

    1989-07-01

    REPORT______ANDDATESCOVERED 4. TITLE AND SUBTITLE S. FUNDING NUMBERS Total Quality Management Office for Contracting Integrity Implementatiun Plan 6. AUTHOR(S) 7...01-280-5500 Standard Form 298 (Rev. 2-89) P’,croed 1:, ANSI Std 3J9-16 29d. 102 4 TOTAL QUALITY MANAGEMENT OFFICE FOR CONTRACTING INTEGRITY...IMPLEMENTATION PLAN According to the Total Quality Management (TQM) Master Plan, each PSE head, supported by Working Groups, will implement the HQ DLA Master

  7. Assessment of levels of hospice care coverage offered to commercial managed care plan members in California: implications for the California Health Insurance Exchange.

    PubMed

    Chung, Kyusuk; Jahng, Joelle; Petrosyan, Syuzanna; Kim, Soo In; Yim, Victoria

    2015-06-01

    The implementation of the Affordable Care Act that provides for the expansion of affordable insurance to uninsured individuals and small businesses, coupled with the provision of mandated hospice coverage, is expected to increase the enrollment of the terminally ill younger population in hospice care. We surveyed health insurance companies that offer managed care plans in the 2014 California health insurance exchange and large hospice agencies that provided hospice care to privately insured patients in 2011. Compared with Medicare and Medicaid hospice benefits, hospice benefits for privately insured patients, particularly those enrolled in managed care plans, varied widely. Mandating hospice care alone may not be sufficient to ensure that individuals enrolled in different managed care plans receive the same level of coverage.

  8. The California Master Plan for Higher Education in the Seventies and Beyond.

    ERIC Educational Resources Information Center

    California State Coordinating Council for Higher Education, Sacramento.

    In 1960 the State of California established a Master Plan for the development, expansion and integration of the facilities, curriculum and standards of higher education, in junior colleges, State colleges, the University of California, and other institutions of higher education of the state, to meet the needs of the state during the 1960's and…

  9. SPECIAL PROBLEM REPORT, IMPROVING EXTENSION PROGRAM PLANNING PROCEDURES IN SAN LUIS OBISPO COUNTY, CALIFORNIA.

    ERIC Educational Resources Information Center

    CANNON, DALE CARTER

    A SURVEY WAS CONDUCTED BY MAIL QUESTIONNAIRE TO GATHER DATA ON THE FARM POPULATION OF SAN LUIS OBISPO COUNTY, CALIFORNIA, TO GET NAMES OF COMMUNITY LEADERS, AND PROVIDE MOTIVATION FOR EXTENSION PROGRAM PLANNING. THE MEAN AGE OF RESPONDENTS WAS 50, THE LARGE MAJORITY WITH CHILDREN AT HOME, THREE-FOURTHS NATIVE TO CALIFORNIA, ONE-HALF BEING BORN IN…

  10. 78 FR 16827 - Designation of Areas for Air Quality Planning Purposes; State of California; Imperial Valley...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-19

    ... AGENCY 40 CFR Part 81 Designation of Areas for Air Quality Planning Purposes; State of California; Imperial Valley Planning Area for PM 10 Clarification of Nonattainment Area Boundary AGENCY: Environmental... Imperial Valley planning area, an area designated as nonattainment for the national ambient air...

  11. Implementation and adaptation of the Re-Engineered Discharge (RED) in five California hospitals: a qualitative research study.

    PubMed

    Mitchell, S E; Weigel, G M; Laurens, V; Martin, J; Jack, B W

    2017-04-19

    Project Re-Engineered Discharge (RED) is an evidence-based strategy to reduce readmissions disseminated and adapted by various health systems across the country. To date, little is known about how adapting Project RED from its original protocol impacts RED implementation and/or sustainability. The goal of this study was to identify and characterize contextual factors influencing how five California hospitals adapted and implemented RED and the subsequent impact on RED program sustainability. Participant observation and key informant and focus group interviews with 64 individuals at five California hospitals implementing RED in 2012 and 2013 were conducted. These involved hospital leadership, personnel responsible for Project RED implementation, hospital staff, and clinicians. Interview transcripts were coded and analyzed using a modified grounded theory approach and constant comparative analysis. Both internal and external contextual factors were identified that influenced hospitals' decisions on RED adaptation and implementation. These also impacted RED sustainability. External factors included: impending federal penalties for hospitals with high readmission rates targeting specific diagnoses, and access to external funding and technical support to help hospitals implement RED. Internal or organizational level contextual factors included: committed leadership prioritizing Project RED; RED adaptations; depth, accountability and influence of the implementation team; sustainability planning; and hospital culture. Only three of the five hospitals continued Project RED beyond the implementation period. The sustainability of RED in participating hospitals was only possible when hospitals approached RED implementation as a transformational process rather than a patient safety project, maintained a high level of fidelity to the RED protocol, and had leadership and an implementation team who embraced change and failure in the pursuit of better patient care and outcomes

  12. 77 FR 476 - Endangered and Threatened Species; Recovery Plan Southern Oregon/Northern California Coast Coho...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-05

    ... Plan Southern Oregon/ Northern California Coast Coho Salmon Evolutionarily Significant Unit AGENCY... Salmon (Oncorhynchus kisutch) Evolutionarily Significant Unit (ESU). NMFS is soliciting review and... Fisheries Service, 1655 Heindon Road, Arcata, CA 95521, Attn: Recovery Coordinator/SONCC Coho Salmon...

  13. 75 FR 67682 - Sequoia National Forest, California; Sequoia National Forest Plan Amendment, Giant Sequoia...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-03

    ...; ] DEPARTMENT OF AGRICULTURE Forest Service Sequoia National Forest, California; Sequoia National Forest Plan Amendment, Giant Sequoia National Monument Draft Environmental Impact Statement, Comprehensive Management...: Comments must be received no later than December 3, 2010. SUMMARY: The Sequoia National Forest hereby...

  14. Savannah River Site environmental implementation plan. Volume 1, Executive summary

    SciTech Connect

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  15. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    SciTech Connect

    Not Available

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  16. Strategic Planning Implementation in Indonesia’s Transmigration Plan.

    DTIC Science & Technology

    1984-06-01

    replaced the Hinduism of the :ndonesians. (Now 90 7,ercent of Indonesia are moslem) excekt for the Balinese, some Javanese , and some Chinese. Currently...block number) I Transmigration, Indonesia , Strategic Planning,"Indon ia s e- velopment Plan, Presidential Decree, t N ASe- Migration, Strategy, Racial...84 5 LIST OF TABLES I. Pcpulation Density of Indonesia in 1978 and 1980 .. ....... ....... ...... *,2 II. Distribution

  17. 76 FR 81727 - Approval and Promulgation of Implementation Plans; Oklahoma; Federal Implementation Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-28

    ...EPA is partially approving and partially disapproving a revision to the Oklahoma State Implementation Plan (SIP) submitted by the State of Oklahoma through the Oklahoma Department of Environmental Quality on February 19, 2010, intended to address the regional haze requirements of the Clean Air Act (CAA). In addition, EPA is partially approving and partially disapproving a portion of a revision to the Oklahoma SIP submitted by the State of Oklahoma on May 10, 2007 and supplemented on December 10, 2007 to address the requirements of CAA section 110(a)(2)(D)(i)(II) as it applies to visibility for the 1997 8- hour ozone and 1997 fine particulate matter National Ambient Air Quality Standards. This CAA requirement is intended to prevent emissions from one state from interfering with the visibility programs in another state. EPA is approving certain core elements of the SIP including Oklahoma's: determination of baseline and natural visibility conditions; coordinating regional haze and reasonably attributable visibility impairment; monitoring strategy and other implementation requirements; coordination with states and Federal Land Managers; and a number of NOX, SO2, and PM BART determinations. EPA is finding that Oklahoma's regional haze SIP did not address the sulfur dioxide Best Available Retrofit Technology requirements for six units in Oklahoma in accordance with the Regional Haze requirements, or the requirement to prevent interference with other states' visibility programs. EPA is promulgating a Federal Implementation Plan to address these deficiencies by requiring emissions to be reduced at these six units. This action is being taken under section 110 and part C of the CAA.

  18. 76 FR 491 - Approval and Promulgation of Implementation Plans; New Mexico; Federal Implementation Plan for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-05

    ...EPA is proposing to disapprove a portion of the State Implementation Plan (SIP) revision submitted by the State of New Mexico for the purpose of addressing the ``good neighbor'' requirements of section 110(a)(2)(D)(i) of the Clean Air Act (CAA or Act) for the 1997 8-hour ozone National Ambient Air Quality Standards (NAAQS or standards) and the 1997 fine particulate matter (PM2.5) NAAQS. The SIP revision addresses the requirement that New Mexico's SIP must have adequate provisions to prohibit emissions from adversely affecting another state's air quality through interstate transport. In this action, EPA is proposing to disapprove the New Mexico Interstate Transport SIP provisions that address the requirement of section 110(a)(2)(D)(i)(II) that emissions from New Mexico sources do not interfere with measures required in the SIP of any other state under part C of the CAA to protect visibility. In this action, EPA is also proposing to promulgate a Federal Implementation Plan (FIP) to prevent emissions from New Mexico sources from interfering with other states' measures to protect visibility, and to implement nitrogen oxides (NOX) and sulfur dioxide (SO2) emission limits necessary at one source to prevent such interference. In addition, EPA is proposing sulfuric acid (H2SO4) and ammonia (NH3) hourly emission limits at the same source, to minimize the contribution of these compounds to visibility impairment. EPA is proposing monitoring, recordkeeping and reporting requirements to ensure compliance with such emission limitations. EPA also proposes that compliance with the emission limits be within three (3) years of the effective date of our final rule. Furthermore, EPA is proposing the FIP to address the requirement for best available retrofit technology (BART) for NOX for this source. This action is being taken under section 110 and part C of the CAA.

  19. University of California, Irvine, Student Affirmative Action Five-Year Plan and Planning Process, 1984-1988. Volume II.

    ERIC Educational Resources Information Center

    Galligani, Dennis J.

    This second volume of the University of California, Irvine (UCI), Student Affirmative Action (SAA) Five-Year Plan contains the complete student affirmative action plans as submitted by 33 academic and administrative units at UCI. The volume is organized by type of unit: academic units, academic retention units, outreach units, and student life…

  20. University of California, Irvine, Student Affirmative Action Five-Year Plan and Planning Process, 1985-1986. Volume III.

    ERIC Educational Resources Information Center

    Galligani, Dennis J.

    An update of the University of California, Irvine, Student Affirmative Action (SAA) plan is presented for 1985-1986. SAA activities planned by both academic and administrative units are covered, such as activities designed to: stimulate greater student involvement, establish clearer life goals and career linkages, enhance cultural awareness, and…

  1. The California Conservation Corps: A Report on Implementation.

    ERIC Educational Resources Information Center

    Lah, David; Wolf, Wendy C.

    The California Conservation Corps (CCC), an amalgam of residential and non-residential centers, was established in 1977. It was designed to accomplish useful work for natural resource agencies and help youth between the ages of 18 and 23 develop a mature work attitude and the ability to function cooperatively as they live and work together. Based…

  2. Implementing California's Regulations on Conflict of Interest in Research.

    ERIC Educational Resources Information Center

    Seligman, Richard P.

    1989-01-01

    Origins of the University of California's procedures for systematic review of principal investigators' financial disclosures prior to acceptance of grants, and the manner in which they are working at present, are examined. The disclosure requirements, faculty committee, criteria, and disclosures made during 1988 are described. Two case studies are…

  3. Implementing California's Regulations on Conflict of Interest in Research.

    ERIC Educational Resources Information Center

    Seligman, Richard P.

    1989-01-01

    Origins of the University of California's procedures for systematic review of principal investigators' financial disclosures prior to acceptance of grants, and the manner in which they are working at present, are examined. The disclosure requirements, faculty committee, criteria, and disclosures made during 1988 are described. Two case studies are…

  4. Implementing a strategic recruitment and retention plan.

    PubMed

    Smeltzer, C H; Tseng, S; Harty, L M

    1991-06-01

    Nurse administrators were faced with how to staff for a rapid expansion in number of beds in the face of a 15% nurse vacancy rate. The authors discuss how they addressed this issue through their multifaceted strategic plan.

  5. Implementing Common Core State Standards in California: A Report from the Field

    ERIC Educational Resources Information Center

    McLaughlin, Milbrey; Glaab, Laura; Carrasco, Isabel Hilliger

    2014-01-01

    In this report, the authors present some initial findings on the early implementation of Common Core State Standards (CCSS) in California. They report on their interviews with educators in all regions of the state, and on their views of how implementation is proceeding in their schools and districts. The authors then review some of the key…

  6. Common Core Implementation in California: A Snapshot of Districts' Progress. CenterView

    ERIC Educational Resources Information Center

    Center for the Future of Teaching and Learning at WestEd, 2016

    2016-01-01

    It has been six years since California adopted the Common Core State Standards (CCSS). District leaders have been busy building capacity and developing infrastructure to support effective CCSS implementation, while teachers have been working hard to implement standards-aligned instruction that supports academic success for all students. In a state…

  7. 75 FR 80058 - Notice of Hearing: Reconsideration of Disapproval of California State Plan Amendments (SPAs) 08...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-21

    ... Disapproval of California State Plan Amendments (SPAs) 08-009A; 08-009B1; 08-009B2; 08-009D; and 08-019 AGENCY... disapprove California SPAs 08-009A; 08- 009B1; 08-009B2; 08-009D; and 08-019. CLOSING DATE: Requests to... disapprove California State plan amendments (SPAs) 08-009A; 08-009B1; 08-009B2; 08-009D; and 08-019 which...

  8. California Schoolin': The Rocky Road to the Master Plan.

    ERIC Educational Resources Information Center

    Smith, Wilson

    2000-01-01

    Reviews the book by John Aubrey Douglass, "The California Idea and American Higher Education," suggesting that it presents a masterful, highly informative, encyclopedic modern history of California's public higher education as it looks at the state government's work toward sponsorship of higher education over the years. (SM)

  9. California Schoolin': The Rocky Road to the Master Plan.

    ERIC Educational Resources Information Center

    Smith, Wilson

    2000-01-01

    Reviews the book by John Aubrey Douglass, "The California Idea and American Higher Education," suggesting that it presents a masterful, highly informative, encyclopedic modern history of California's public higher education as it looks at the state government's work toward sponsorship of higher education over the years. (SM)

  10. 75 FR 27944 - Approval and Promulgation of Implementation Plans; Designation of Areas for Air Quality Planning...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-19

    ... Air Quality Planning Purposes; State of California; PM-10; Determination of Attainment for the Coso... determination that the Coso Junction nonattainment area (CJNA) has attained the 24-hour National Ambient Air... monitoring data for the PM-10 NAAQS from 2006-2008. In addition, reported data in EPA's Air Quality System...

  11. Are Urban Stream Restoration Plans Worth Implementing?

    NASA Astrophysics Data System (ADS)

    Sarvilinna, Auri; Lehtoranta, Virpi; Hjerppe, Turo

    2017-01-01

    To manage and conserve ecosystems in a more sustainable way, it is important to identify the importance of the ecosystem services they provide and understand the connection between natural and socio-economic systems. Historically, streams have been an underrated part of the urban environment. Many of them have been straightened and often channelized under pressure of urbanization. However, little knowledge exists concerning the economic value of stream restoration or the value of the improved ecosystem services. We used the contingent valuation method to assess the social acceptability of a policy-level water management plan in the city of Helsinki, Finland, and the values placed on improvements in a set of ecosystem services, accounting for preference uncertainty. According to our study, the action plan would provide high returns on restoration investments, since the benefit-cost ratio was 15-37. Moreover, seventy-two percent of the respondents willing to pay for stream restoration chose "I want to conserve streams as a part of urban nature for future generations" as the most motivating reason. Our study indicates that the water management plan for urban streams in Helsinki has strong public support. If better marketed to the population within the watershed, the future projects could be partly funded by the local residents, making the projects easier to accomplish. The results of this study can be used in planning, management and decision making related to small urban watercourses.

  12. Are Urban Stream Restoration Plans Worth Implementing?

    PubMed

    Sarvilinna, Auri; Lehtoranta, Virpi; Hjerppe, Turo

    2017-01-01

    To manage and conserve ecosystems in a more sustainable way, it is important to identify the importance of the ecosystem services they provide and understand the connection between natural and socio-economic systems. Historically, streams have been an underrated part of the urban environment. Many of them have been straightened and often channelized under pressure of urbanization. However, little knowledge exists concerning the economic value of stream restoration or the value of the improved ecosystem services. We used the contingent valuation method to assess the social acceptability of a policy-level water management plan in the city of Helsinki, Finland, and the values placed on improvements in a set of ecosystem services, accounting for preference uncertainty. According to our study, the action plan would provide high returns on restoration investments, since the benefit-cost ratio was 15-37. Moreover, seventy-two percent of the respondents willing to pay for stream restoration chose "I want to conserve streams as a part of urban nature for future generations" as the most motivating reason. Our study indicates that the water management plan for urban streams in Helsinki has strong public support. If better marketed to the population within the watershed, the future projects could be partly funded by the local residents, making the projects easier to accomplish. The results of this study can be used in planning, management and decision making related to small urban watercourses.

  13. State Waste Discharge Permit ST-4502 Implementation Plan

    SciTech Connect

    BROWN, M.J.; LECLAIR, M.D.

    2000-09-27

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

  14. AQUATIC STRESSORS: FRAMEWORK AND IMPLEMENTATION PLAN FOR EFFECTS RESEARCH

    EPA Science Inventory

    This document describes the framework and research implementation plans for ecological effects research on aquatic stressors within the National Health and Environmental Effects Laboratory. The context for the research identified within the framework is the common management goal...

  15. Sulfur Dioxide State Implementation Plan (SIP) Checklist Guide

    EPA Pesticide Factsheets

    Tools, guidance, and examples to assist air quality agencies of non-attainment areas in developing plans to implement national ambient air quality standards (NAAQS), including the sulfur dioxide (SO2) air emissions standard.

  16. Implementing the Aquidneck Island West Side Master Plan

    EPA Pesticide Factsheets

    This report describes a technical assistance project with Aquidneck Island to develop approaches for mixed-use zoning standards, design guidelines, and review processes to implement the West Side Master Plan.

  17. Orbiting deep space relay station. Volume 3: Implementation plan

    NASA Technical Reports Server (NTRS)

    Hunter, J. A.

    1979-01-01

    An implementation plan for the Orbiting Deep Space Relay Station (ODSRS) is described. A comparison of ODSRS life cycle costs to other configuration options meeting future communication requirements is presented.

  18. 40 CFR 49.9986 - Contents of implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Implementation Plan for the Confederated Tribes of the Coos, Lower Umpqua and Siuslaw Indians of Oregon § 49.9986... the Coos, Lower Umpqua and Siuslaw Indians consists of the following rules, regulations, and...

  19. 40 CFR 49.9986 - Contents of implementation plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Implementation Plan for the Confederated Tribes of the Coos, Lower Umpqua and Siuslaw Indians of Oregon § 49.9986... the Coos, Lower Umpqua and Siuslaw Indians consists of the following rules, regulations, and...

  20. 40 CFR 49.9986 - Contents of implementation plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Implementation Plan for the Confederated Tribes of the Coos, Lower Umpqua and Siuslaw Indians of Oregon § 49.9986... the Coos, Lower Umpqua and Siuslaw Indians consists of the following rules, regulations, and...

  1. Handbook for Decentralized Education Planning. Implementing National EFA Plans

    ERIC Educational Resources Information Center

    Online Submission, 2005

    2005-01-01

    The Dakar 2000 goal of Education For All (EFA) is at the center of UNESCO's education activities worldwide. The wide-ranging efforts to achieve EFA in many countries involve education reform, development strategies and plans. Decentralization, a major component in modernizing the public sector, is also applicable to the education sector. The…

  2. Tank farms justification for continued operations 007 Implementation Plan

    SciTech Connect

    Propson, J.G., Westinghouse Hanford

    1996-08-23

    This Implementation Plan (IP) provides detailed descriptions, cost estimates, and schedules of activities required to implement the controls specified in Flammable Gas/Slurry Growth Unreviewed Safety Question: Justification for Continued Operation for the Tank Farms at Hanford Site (WHC-SD-WM-JCO-007, Rev.0). This IP complies with the Interim Operational Safety Requirements (IOSR) Administrative Control 5.27 and WHC-IP-0842 Volume 4 Section 5.6 for such a plan.

  3. Environmental Protection Implementation Plan, November 9, 1991--November 9, 1992

    SciTech Connect

    Latham, A.R.; Evans, R.B.

    1991-11-01

    DOE Order 5400.1, General Environmental Protection Program,'' established environmental protection program requirements, authorities, and responsibilities to assure that the Department of Energy (DOE) operations are in compliance with applicable federal, state, and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter 3 of DOE Order 5400.1 required that each field organization prepare a plan for implementing the requirements of this order by no later than November 9, 1989, and update the plan annually. Therefore, the Department of Energy/Field Office, Nevada (DOE/NV) has prepared this second annual update of its Environmental Protection Implementation Plan (EPIP). The Order and corresponding guidances also require estimated budgetary resources necessary for implementation of the Order be identified in the Environmental Protection Implementation Plan. To satisfy this requirement, the estimated costs to effectuate necessary changes in existing programs or processes and to institute new programs or processes for compliance with the Order are provided in the following sections of this plan. The DOE/NV Assistant Manager for Operations (AMO), in consultation with other organizations responsible for line management of plan implementation, is responsible for annual plan revisions. 7 figs.

  4. Management Planning Requirements for Implementing Office Automation.

    ERIC Educational Resources Information Center

    McDole, Thomas L.

    To be successful in implementing office automation, office managers must consider more than the obvious question of which system to purchase. They must consider whether automation of their particular office and operations will yield benefits of a significant magnitude to warrant the expense of money, time, and energy needed to install and operate…

  5. Department of Defense Training Transformation Implementation Plan

    DTIC Science & Technology

    2003-06-10

    reporting system will be on the joint mission essential tasks of the combatant commanders. Joint Lessons - Learned Program The Secretary of Defense, the...Chairman of the Joint Chiefs of Staff, and the Defense Planning Guidance have highlighted the importance of an effective joint lessons - learned program . The...required for improved joint force readiness. A key component of the Joint Lessons Learned Program —the Joint Center for Lessons Learned—identifies

  6. 40 CFR 51.851 - State Implementation Plan (SIP) revision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 2 2010-07-01 2010-07-01 false State Implementation Plan (SIP... Plan (SIP) revision. Link to an amendment published at 75 FR 17272, April 5, 2010. (a) Each State must... to meet the Act requirements until such time as the required conformity SIP revision is approved...

  7. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Master Implementation Sequencing Plan. 385.30 Section 385.30 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN...

  8. 33 CFR 385.30 - Master Implementation Sequencing Plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Master Implementation Sequencing Plan. 385.30 Section 385.30 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY, DEPARTMENT OF DEFENSE PROGRAMMATIC REGULATIONS FOR THE COMPREHENSIVE EVERGLADES RESTORATION PLAN...

  9. Bird Conservation Planning and Implementation in Canada's Intermountain Region

    Treesearch

    Ilia Hartasanchez; Krista De Groot; Andre Breault; Rob W. Butler

    2005-01-01

    Bird conservation planning in British Columbia and Yukon has been carried out by each of the major bird initiatives. The purpose of this paper is to provide a status report of planning activities and to discuss how integration of the initiatives is being accomplished for efficient and effective implementation of bird conservation actions.

  10. 40 CFR 49.10556 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  11. 40 CFR 49.10376 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  12. 40 CFR 49.10646 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  13. 40 CFR 49.10986 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  14. 40 CFR 49.10436 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  15. 40 CFR 49.10736 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  16. 40 CFR 49.10586 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  17. 40 CFR 49.10856 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  18. 40 CFR 49.10136 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  19. 40 CFR 49.9986 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes-Region X...) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section 49.126Rule for...

  20. 40 CFR 49.10496 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  1. 40 CFR 49.10226 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  2. 40 CFR 49.10166 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  3. 40 CFR 49.10196 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  4. 40 CFR 49.9896 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes-Region X... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  5. 40 CFR 49.10016 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  6. 40 CFR 49.11106 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  7. 40 CFR 49.10956 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  8. 40 CFR 49.10926 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  9. 40 CFR 49.10316 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  10. 40 CFR 49.10346 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  11. 40 CFR 49.10886 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  12. 40 CFR 49.10826 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  13. 40 CFR 49.11076 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  14. 40 CFR 49.10766 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  15. 40 CFR 49.10286 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  16. 40 CFR 49.10106 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ....135Rule for emissions detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  17. 40 CFR 49.10676 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  18. 40 CFR 49.11046 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  19. 40 CFR 49.10466 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  20. 40 CFR 49.9956 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... detrimental to public health or welfare. (k) Section 49.137Rule for air pollution episodes. (l) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (m) Section 49... ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for Tribes-Region...

  1. 40 CFR 49.10706 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... detrimental to public health or welfare. (i) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (k) Section 49... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  2. 40 CFR 49.11016 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    .... (k) Section 49.135Rule for emissions detrimental to public health or welfare. (l) Section 49.137Rule for air pollution episodes. (m) Section 49.138Rule for the registration of air pollution sources and... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  3. 40 CFR 49.10406 - Contents of implementation plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... health or welfare. (n) Section 49.137Rule for air pollution episodes. (o) Section 49.138Rule for the registration of air pollution sources and the reporting of emissions. (p) Section 49.139Rule for non-Title V... FEDERAL ASSISTANCE INDIAN COUNTRY: AIR QUALITY PLANNING AND MANAGEMENT Implementation Plans for...

  4. 78 FR 70012 - Lake Tahoe Basin Management Unit, California, Land Management Plan Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-22

    ... Forest Service Lake Tahoe Basin Management Unit, California, Land Management Plan Revision AGENCY: Lake Tahoe Basin Management Unit, Forest Service, USDA. ACTION: Notice of objection filing period. SUMMARY... Management Unit (LTBMU) Land Management Plan Revision available for the 60-day pre-decisional objection...

  5. The Impact on Clinics of the California Office of Family Planning Budget Cuts.

    ERIC Educational Resources Information Center

    Brindis, Claire; And Others

    The California Office of Family Planning (OFP), a branch of the Family Health Division, Department of Health Services, was established in 1973 to provide assistance and services relating to the planning of families. In July 1989, state appropriations for OFP were cut by two-thirds, leaving $12 million to support the provision of family planning…

  6. The Impact on Clinics of the California Office of Family Planning Budget Cuts.

    ERIC Educational Resources Information Center

    Brindis, Claire; And Others

    The California Office of Family Planning (OFP), a branch of the Family Health Division, Department of Health Services, was established in 1973 to provide assistance and services relating to the planning of families. In July 1989, state appropriations for OFP were cut by two-thirds, leaving $12 million to support the provision of family planning…

  7. 40 CFR 51.372 - State Implementation Plan submissions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Inspection... Standard in place prior to implementation of the 8-hour ozone standard and including all necessary legal... later than November 15, 1993. For non-attainment areas designated and classified under the 8-hour...

  8. 40 CFR 51.372 - State Implementation Plan submissions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Inspection... Standard in place prior to implementation of the 8-hour ozone standard and including all necessary legal... later than November 15, 1993. For non-attainment areas designated and classified under the 8-hour...

  9. A K-12 Written Guidance Plan. Minimum Standards Implementation Series.

    ERIC Educational Resources Information Center

    Ohio State Dept. of Education, Columbus. Div. of Elementary and Secondary Education.

    One of a series of implementation documents prepared in conjunction with the revised minimum standards adopted in 1983 by the Ohio State Board of Education for elementary and secondary schools, this leadership document addresses the need, the purpose, and the implementation procedures for a K-12 written guidance plan in accordance with the Ohio…

  10. 40 CFR 51.1002 - Submittal of State implementation plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    .... 51.1002 Section 51.1002 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR... Implementation of PM2.5 National Ambient Air Quality Standards § 51.1002 Submittal of State implementation plan. (a) For any area designated by EPA as nonattainment for the PM2.5 NAAQS, the State must submit a...

  11. 40 CFR 49.10646 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  12. 40 CFR 49.10886 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  13. 40 CFR 49.10956 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  14. 40 CFR 49.11106 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  15. 40 CFR 49.10496 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  16. 40 CFR 49.10856 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  17. 40 CFR 49.10556 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  18. 40 CFR 49.10586 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  19. 40 CFR 49.11076 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  20. 40 CFR 49.10316 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  1. 40 CFR 49.10286 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) Section 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... limiting visible emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter....

  2. 40 CFR 49.10736 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  3. 40 CFR 49.10376 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  4. 40 CFR 49.11046 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  5. 40 CFR 49.10196 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  6. 40 CFR 49.10766 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  7. 40 CFR 49.10986 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  8. 40 CFR 49.10826 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  9. 40 CFR 49.10466 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  10. 40 CFR 49.10016 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... pollution episodes. (j) Section 49.138Rule for the registration of air pollution sources and the reporting... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation...) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section 49.126Rule for...

  11. 40 CFR 49.10166 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  12. 40 CFR 49.10926 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  13. 40 CFR 49.10436 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  14. 40 CFR 49.10136 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  15. 40 CFR 49.10226 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  16. 40 CFR 49.10346 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 49.137Rule for air pollution episodes. (j) Section 49.138Rule for the registration of air pollution... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation... emissions. (c) Section 49.125Rule for limiting the emissions of particulate matter. (d) Section...

  17. 40 CFR 49.10406 - Contents of implementation plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ....137Rule for air pollution episodes. (o) Section 49.138Rule for the registration of air pollution sources... FEDERAL ASSISTANCE TRIBAL CLEAN AIR ACT AUTHORITY Implementation Plans for Tribes-Region X Implementation....133Rule for agricultural burning permits. (l) Section 49.134Rule for forestry and silvicultural...

  18. Implementation in Head Start Planned Variation: 1971-72.

    ERIC Educational Resources Information Center

    Lukas, Carol VanDeusen; Wohlleb, Cindy

    This report on model implementation during the third year (1971-72) of the Head Start Planned Variation experiment concentrates on the development of measures of implementation. Measures are examined individually in terms of design and use, strengths and weaknesses, and findings obtained, and agreement among raters on the extent of implementation…

  19. Operational Management Plans: Status, Content, and Implementation

    DTIC Science & Technology

    1989-10-01

    prepared the OMP. This is a form of nonprobability 4 sampling termed purposive (Kerlinger 1973). It is intended to obtain informa- tion on typical units...objectives were to: a. Determine the current status of OMPs from a representative sample of Corps Districts. b. Identify the major topical components of...affords a representation of District interpreta- tion and implementation of OMP guidelines. However, even when requested to provide representative samples

  20. Implementation in Practice: Adaptations to Sexuality Education Curricula in California

    ERIC Educational Resources Information Center

    Arons, Abigail; Decker, Mara; Yarger, Jennifer; Malvin, Jan; Brindis, Claire D.

    2016-01-01

    Background: Local implementation of evidence-based curricula, including sex education, has received increasing attention. Although there are expectations that practitioners will implement evidence-based programs with fidelity, little is known regarding the experiences of instructors in meeting such standards. During 2005 to 2009, the California…

  1. Implementation in Practice: Adaptations to Sexuality Education Curricula in California

    ERIC Educational Resources Information Center

    Arons, Abigail; Decker, Mara; Yarger, Jennifer; Malvin, Jan; Brindis, Claire D.

    2016-01-01

    Background: Local implementation of evidence-based curricula, including sex education, has received increasing attention. Although there are expectations that practitioners will implement evidence-based programs with fidelity, little is known regarding the experiences of instructors in meeting such standards. During 2005 to 2009, the California…

  2. 40 CFR 49.10170 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Jamestown S'klallam Tribe of Washington § 49... incorporated and made part of the implementation plan for the Reservation of the Jamestown S'Klallam Tribe:...

  3. 40 CFR 49.10170 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Jamestown S'klallam Tribe of Washington § 49... incorporated and made part of the implementation plan for the Reservation of the Jamestown S'Klallam Tribe:...

  4. 40 CFR 49.10170 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Jamestown S'klallam Tribe of Washington § 49... incorporated and made part of the implementation plan for the Reservation of the Jamestown S'Klallam Tribe:...

  5. 40 CFR 49.10260 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Kootenai Tribe of Idaho § 49.10260 Federally... part of the implementation plan for the Reservation of the Kootenai Tribe of Idaho: (a) Section 49...

  6. 40 CFR 49.10260 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Kootenai Tribe of Idaho § 49.10260 Federally... part of the implementation plan for the Reservation of the Kootenai Tribe of Idaho: (a) Section 49...

  7. 40 CFR 49.10050 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon... regulations are incorporated and made part of the implementation plan for the Reservation of the Cow Creek...

  8. 40 CFR 49.10050 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon... regulations are incorporated and made part of the implementation plan for the Reservation of the Cow Creek...

  9. 40 CFR 49.10050 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon... regulations are incorporated and made part of the implementation plan for the Reservation of the Cow Creek...

  10. 40 CFR 49.10050 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Cow Creek Band of Umpqua Indians of Oregon... regulations are incorporated and made part of the implementation plan for the Reservation of the Cow Creek...

  11. 40 CFR 49.11080 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Warm Springs... following regulations are incorporated and made part of the implementation plan for the Warm...

  12. 40 CFR 49.11080 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Warm Springs... following regulations are incorporated and made part of the implementation plan for the Warm...

  13. 40 CFR 49.11080 - Federally-promulgated regulations and Federal implementation plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Implementation Plans for Tribes-Region X Implementation Plan for the Confederated Tribes of the Warm Springs... following regulations are incorporated and made part of the implementation plan for the Warm...

  14. 75 FR 68294 - Revisions to the California State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-05

    ... Technology (RACT) for each category of sources covered by a Control Techniques Guidelines (CTG) document as.... ``Alternative Control Techniques Document--NO X Emissions from Industrial/Commercial/Institutional (ICI) Boilers'', US EPA 453/R-94-022, March 1994. 8. ``Alternative Control Techniques Document--NO X Emissions from...

  15. 75 FR 45080 - Revisions to the California State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-02

    ... generators and process heaters with a rated heat input from 0.75 to less than 2.0 MMbtu/hr. We are approving... from boilers, steam generators, process heaters and water heaters with a total rated heat input equal... Boilers, Steam Generators 12/17/09 05/17/10 and Process Heaters-- 0.75 to less than 2.0 MMbtu/hr. On June...

  16. 75 FR 14545 - Revisions to the California State Implementation Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-26

    ... refinery vacuum producing devices by covering hot wells and collecting vapors for recycle to refinery gas... emissions from a refinery process unit turnaround by collecting vapors for recycle to refinery...

  17. Defense Depot Mechanicsburg Total Quality Management Implementation Plan

    DTIC Science & Technology

    1989-06-01

    B T I TLEE 5 . FUNDING NUMBERS Defense Depot Mechanicsburg Total Quality Management Implementation Plan 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME...Form 298 (Rev. 2-89) L296- 102 Acces.ion For NYI J ... I:: ted DEFENSE DEPOT MECHANICSBURG PENNSYLVANIAL--I By_ TOTAL QUALITY MANAGEMENT K_~ t buty-n...IMPLEMENTATION PLAN Avmail-t!Ilty Codes IvLl c 2Dd/or JUN 3 0 1989 iDizt Special PURPOSE The purpose of this Total Quality Management Implementation

  18. ARM Unmanned Aerial Systems Implementation Plan

    SciTech Connect

    Schmid, Beat; Ivey, Mark

    2016-11-01

    Recent advances in Unmanned Aerial Systems (UAS) coupled with changes in the regulatory environment for operations of UAS in the National Airspace increase the potential value of UAS to the U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) Climate Research Facility. UAS include unmanned aerial vehicles (UAV) and tethered balloon systems (TBS). The roles UAVs and TBSs could play within the ARM Facility, particularly science questions they could help address, have been discussed in several workshops, reports, and vision documents, including: This document describes the implementation of a robust and vigorous program for use of UAV and TBS for the science missions ARM supports.

  19. Achieving succession planning and implementation: one healthcare network's story.

    PubMed

    Capuano, Terry Ann; MacKenzie, Richard

    2013-01-01

    Frequent transitions in leadership can cause inefficiency, inconsistency, and lack of alignment with priorities and strategy. Retaining management talent and collaboratively planning their succession can help ensure organizational survival. Succession planning, in healthcare and other industries, addresses some of these concerns; however, there is a dearth of descriptive articles emphasizing "how to." This article demonstrates one healthcare network's comprehensive system for succession planning and implementation. Leaders looking to plan their human resource processes for organizational sustainability would be able to emulate and adapt practices for their networks.

  20. Perioperative Research Fellowship: Planning, Implementation, Experience

    PubMed Central

    Memtsoudis, Stavros G; Mazumdar, Madhu; Stundner, Ottokar; Hargett, Mary J.

    2014-01-01

    Perioperative outcomes research has gained widespread interest and is viewed as increasingly important among different specialties, including anesthesiology. Outcome research studies serve to help in the adjustment of risk, allocation of resources, and formulation of hypotheses to guide future research. Pursuing high quality research projects requires familiarity with a wide range of research methodologies, and concepts are ideally learned in a dedicated setting. Skills associated with the use of these methodologies as well as with scientific publishing in general, however, are increasingly challenging to acquire. This article is intended to describe the curriculum and implementation of the Perioperative Medicine and Regional Anesthesia Research Fellowship at the Hospital for Special Surgery. We also propose a methodology to evaluate the success of a research fellowship curriculum. PMID:24942850

  1. PACS: from planning to implementation for a new hospital facility

    NASA Astrophysics Data System (ADS)

    Meyers, Judith A.

    2001-08-01

    Planning PACS for a new hospital facility is an enormous undertaking with many varied user opinions. A pure objective-oriented planning approach was utilized along with a small PACS core planning team. The small PACS core team consisted of owner representation (administration), user representation (radiologists) and the PACS consultant. The overall PACS planning process was broken down into segments. Each segmented represented a key milestone for PACS planning with a set of clear objectives. The PACS core team followed a schedule beginning with preliminary PACS information moving forward to bid specification. An important element in PACS planning was the development of a PACS Component Location Matrix. The matrix was developed from the architectural plans for the new hospital and provided a guideline for everyone including architects and engineers. The matrix included CAD system identification number, location by architectural room number, room name, component network, remote diagnostics and storage. After a year of planning the PACS system and acceptance of vendor bid, the implementation process was ready to begin. The same small PACS core planning team remains intact for the implementation phase of the project.

  2. 78 FR 4868 - Notice of Intent To Amend the California Desert Conservation Area Plan and Prepare an Associated...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-23

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF THE INTERIOR Bureau of Land Management Notice of Intent To Amend the California Desert Conservation Area Plan and...) Needles Field Office, Needles, California intends to prepare an amendment to the California...

  3. Beyond the Master Plan: The Case for Restructuring Baccalaureate Education in California. Research & Occasional Paper Series: CSHE.16.10

    ERIC Educational Resources Information Center

    Geiser, Saul; Atkinson, Richard C.

    2010-01-01

    Although a stunning success in many ways, California's 1960 Master Plan for Higher Education has been a conspicuous failure in one respect: California ranks near the bottom of the states in the proportion of its college-age population that attains a baccalaureate degree. California's poor record of B.A. attainment is an unforeseen consequence of…

  4. 77 FR 51739 - Approval and Promulgation of Implementation Plans; Tennessee; Regional Haze State Implementation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-27

    ... Implementation Plan; Best Available Retrofit Technology for Eastman Chemical Company AGENCY: Environmental... Conservation (TDEC), on May 14, 2012, related to the Best Available Retrofit Technology (BART) requirements for... best system of continuous emissions control technology available and associated emissions reductions...

  5. Implementing Strategic Environmental Assessment of spatial planning tools

    SciTech Connect

    De Montis, Andrea

    2013-07-15

    After more than a decade from the publication of the European Directive 2001/42/CE (Directive) on Strategic Environmental Assessment (SEA), the design and construction of the interested spatial planning instruments has gone through a variety of changes and integrations in European and in world states. This inhomogeneous panorama can be explained with a pattern of institutional structures that have so far affected the implementation of the Directive. The aim of this paper is to investigate the level of implementation of the Directive in Italy by developing a comparative analysis of the quality of integration of SEA within the design of the spatial coordination plan of a set of Italian provinces. Italian practice is analyzed in the framework of a comparative study of worldwide SEA implementation within spatial and land use planning. The results reveal strengths and weaknesses in SEA implementation at the provincial level and, in particular, the emergence of critical areas of research concerning institutional context, public participation, monitoring, and observatory of the spatial transformations. -- Highlights: • This is a comparative analysis of SEA in strategic spatial planning in Italy. • The adhesion of Provinces to the study is remarkable. • SEA implementation and integration into spatial planning is still moderate. • Participation via consultations should be more widespread. • Monitoring and institution of observatories are still in an infancy stage.

  6. University of California, Irvine, Student Affirmative Action Five-Year Plan and Planning Process, 1986-1987. Volume IV.

    ERIC Educational Resources Information Center

    Galligani, Dennis J.

    The University of California, Irvine, 1986-1987 Student Affirmative Action (SAA) Plan is presented. An introductory section covers the organizational structure of SAA efforts, progress toward SAA goals, persistence and graduation rates for new SAA high school freshmen through spring 1985, and an overview of SAA education-oriented and…

  7. Water quality improvement policies: lessons learned from the implementation of Proposition O in Los Angeles, California

    Treesearch

    Mi-Hyun Park; Michael Stenstrom; Stephanie Pincetl

    2009-01-01

    This article evaluates the implementation of Proposition O, a stormwater cleanup measure, in Los Angeles, California. The measure was intended to create new funding to help the city comply with the Total Maximum Daily Load requirements under the federal Clean Water Act. Funding water quality objectives through a bond measure was necessary because the city had...

  8. Implementing California's School Funding Formula: Will High-Need Students Benefit? Technical Appendix

    ERIC Educational Resources Information Center

    Hill, Laura; Ugo, Iwunze

    2015-01-01

    Intended to accompany "Implementing California's School Funding Formula: Will High-Need Students Benefit?," this appendix examines the extent to which school shares of high-need students vary relative to their district concentrations by grouping approximately 950 school districts by their share of high-need students, arraying them into…

  9. Key Factors Associated with the Effective Implementation and Impact of California's Educational Reform.

    ERIC Educational Resources Information Center

    Marsh, David D.

    This study focused on the implementation of "top-down" California state-initiated reform in secondary schools and the impact of that process on several outcomes: student academic achievement and the capacity of the organization to carry out ongoing reform. The research was part of a broader study of secondary school reform and how the…

  10. Best Practices Models for Implementing, Sustaining, and Using Instructional School Gardens in California

    ERIC Educational Resources Information Center

    Hazzard, Eric L.; Moreno, Elizabeth; Beall, Deborah L.; Zidenberg-Cherr, Sheri

    2011-01-01

    To ascertain best practices for schools implementing or sustaining instructional school gardens by interviewing key members in 10 schools with exemplary instructional school gardens programs in California. Practices of schools with exemplary instructional school gardens programs were analyzed by constant comparative analysis using qualitative data…

  11. Implementing California's School Funding Formula: Will High-Need Students Benefit? Technical Appendix

    ERIC Educational Resources Information Center

    Hill, Laura; Ugo, Iwunze

    2015-01-01

    Intended to accompany "Implementing California's School Funding Formula: Will High-Need Students Benefit?," this appendix examines the extent to which school shares of high-need students vary relative to their district concentrations by grouping approximately 950 school districts by their share of high-need students, arraying them into…

  12. Implementation plan for Bolivian Mineral Exploration Fund

    USGS Publications Warehouse

    Kirkemo, Harold

    1978-01-01

    Bolivia ranks second among world producers of tin and antimony, and first in bismuth production. Mineral exports in 1975 were valued at $314.2 million, nearly 60 percent of the value of all exports, and petroleum product exports totalled nearly $157 million, or 30 percent of the total. Tin accounted for 58 percent of the total value of metallic mineral exports. The central government derived about 19 percent of its total tax revenues in 1975 from the mining sector. The mining sector consists of the large, medium, and small mining subsectors, a classification established by the government. Individual operations are referred to as large, medium, or small depending upon the subsector into which they are classified. All large mining enterprises are owned and operated by a government corporation, COMIBOL; the medium and small operations are privately owned. COMIBOL's exports in 1975 were valued at $171.8 million or 70 percent of the total mineral exports; the medium mines accounted for $55.5 million or 23 percent, and the small mines for $17.5 million or 7 percent of the total. The combination of high operating costs, low productivity, inadequate ore reserves, and insufficient risk capital for exploration and development has led to the realization that there is an urgent need to improve the situation for mining in Bolivia. Proposals are being studied to revise the tax code, a program is underway to evaluate selected mineral deposits for possible exploration and development, and programs are under consideration to encourage minerals exploration. A minerals exploration plan is proposed which would offer technical and financial aid to various segments in the minerals field. A program, estimated to cost between $2 million and $2.5 million annually, and to be operated by a new agency in the Ministry of Mining and Metallurgy, is outlined.

  13. Covered California: The Impact of Provider and Health Plan Market Power on Premiums.

    PubMed

    Scheffler, Richard M; Kessell, Eric; Brandt, Margareta

    2015-12-01

    We explain the establishment of Covered California, California's health insurance marketplace. The marketplace uses an active purchaser model, which means that Covered California can selectively contract with some health plans and exclude others. During the 2014 open-enrollment period, it enrolled 1.3 million people, who are covered by eleven health plans. We describe the market shares of health plans in California and in each of the nineteen rating regions. We examine the empirical relationship between measures of provider market concentration--spanning health plans, hospitals, and medical groups--and rating region premiums. To do this, we analyze premiums for silver and bronze plans for specific age groups. We find both medical group concentration and hospital concentration to be positively associated with premiums, while health plan concentration is not statistically significant. We simulate the impact of reducing hospital concentration to levels that would exist in moderately competitive markets. This produces a predicted overall premium reduction of more than 2 percent. However, in three of the nineteen rating regions, the predicted premium reduction was more than 10 percent. These results suggest the importance of provider market concentration on premiums.

  14. California spotted owl: scientific considerations for forest planning

    Treesearch

    John J. Keane

    2014-01-01

    California spotted owls (Strix occidentalis occidentalis) (fig. 1) have been at the forefront of Sierra Nevada management and conservation debates for 25 years because of their strong habitat associations with commercially valuable large trees, snags, and late-successional forests. Initial concerns focused on the effects of timber harvest on large...

  15. Update of the Used Fuel Dispositon Campaign Implementation Plan

    SciTech Connect

    McMahon, Kevin A.; Bragg-Sitton, Shannon; Mackinnon, Robert James; Saltzstein, Sylvia J.; Sorenson, Ken B.; Swift, Peter N.; Birkholzer, Jens T.

    2014-10-01

    This Update to the Used Fuel Disposition Campaign Implementation Plan provides summary level detail describing how the Used Fuel Disposition Campaign (UFDC) supports achievement of the overarching mission and objectives of the Department of Energy Office of Nuclear Energy Fuel Cycle Technologies Program, building on work completed in this area since 2009. This implementation plan begins with the assumption of target dates that are set out in the January 2013 DOE Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (http://energy.gov/downloads/strategy-management-and-disposal-used-nuclearfuel- and-high-level-radioactive-waste). These target dates and goals are summarized in section III. This implementation plan will be maintained as a living document and will be updated as needed in response to available funding and progress in the Used Fuel Disposition Campaign and the Fuel Cycle Technologies Program.

  16. Update of the used fuel disposition Campaign Implementation Plan

    SciTech Connect

    Birkholzer, Jens; MacKinnon, Robert; McMahon, Kevin; Saltzstein, Sylvia; Sorenson, Ken; Swift, Peter

    2014-09-01

    This Campaign Implementation Plan provides summary level detail describing how the Used Fuel Disposition Campaign (UFDC) supports achievement of the overarching mission and objectives of the Department of Energy Office of Nuclear Energy Fuel Cycle Technologies Program The implementation plan begins with the assumption of target dates that are set out in the January 2013 DOE Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (http://energy.gov/downloads/strategy-management-and-disposal-used-nuclear-fuel-and-high-level-radioactive-waste). These target dates and goals are summarized in section III. This implementation plan will be maintained as a living document and will be updated as needed in response to progress in the Used Fuel Disposition Campaign and the Fuel Cycle Technologies Program.

  17. High performance computing and communications: FY 1996 implementation plan

    SciTech Connect

    1995-05-16

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage of the High Performance Computing Act of 1991, signed on December 9, 1991. Twelve federal agencies, in collaboration with scientists and managers from US industry, universities, and research laboratories, have developed the Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1995 and FY 1996. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency.

  18. RCRA implementation plan (RIP): Fiscal years 1996--1997

    SciTech Connect

    1995-05-01

    The report defines the national policy and strategic goals and priority activities for the RCRA solid and hazardous waste program. Includes both changes and clarifications to the fiscal year 1994 RCRA implementation plan and the fiscal year 1995 addendum. It provides additional guidance in waste minimization, corrective action, state grants, beginning of the year plans, Indian programs, environmental justice, information management, state authorization, permitting/closure, and subtitle D activities.

  19. Planning, implementing, and using a virtual reference service.

    PubMed

    MacDonald, Marlyse H

    2003-01-01

    Virtual reference (VR) can be a successful vehicle for libraries if there is a demonstrated need by the user base for such a service and if the library staff believes in, accepts, and plans thoroughly for the concept. This article focuses on the experiences of the Duke University Medical Center Library (DUMCL) in planning, implementing, and using a virtual reference service utilizing LSSI's Virtual Reference Desk (VRD) Software.

  20. Systems engineering implementation plan for the liquid effluents services program

    SciTech Connect

    Lowe, S.S.

    1995-01-01

    A graded approach is being taken by the Liquid Effluents Services Program in implementing systems engineering because of the advanced state of the program. The approach is cost-effective and takes credit for related work already completed, yet retains the benefits of systems engineering. This plan describes how the Liquid Effluents Services Program will implement systems engineering so there is a common understanding. Systems engineering work to be performed and the products of that work are identified. The relation to the current planning process and integration with the sitewide systems engineering effort is described.